{"meta":{"query_hash":"7435e0e23ead","filters":{"topic":"Smart Grid Energy Management"},"cohort_total":1506,"direct_labels_cover":1,"predictions_cover":1506,"exported":1506,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7435e0e23ead","api":"https://metacan.xera.ac/api/v1/cohort?topic=Smart+Grid+Energy+Management"},"results":[{"id":"W1181877844","doi":"","title":"Economical and Reliable Method of Water Purification","year":2014,"lang":"en","type":"article","venue":"Asian Journal of Water Environment and Pollution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Boiling; Process engineering; Work (physics); Simplicity; Process (computing); Computer science; Environmental science; Current (fluid); Portable water purification; Biochemical engineering; Environmental engineering; Engineering; Mechanical engineering; Chemistry","score_opus":0.004818241127481549,"score_gpt":0.1694440748232571,"score_spread":0.16462583369577555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1181877844","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05473815,0.08189012,0.7931171,0.0030840754,0.002985213,0.001332102,0.0011070012,0.0019573183,0.059788916],"genre_scores_gemma":[0.4395215,0.05395136,0.45777616,0.0011109387,0.0021337406,0.0012887821,0.0015077508,0.0003962827,0.042313464],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99740857,0.00023560264,0.00011651147,0.0003168367,0.0017908071,0.0001316569],"domain_scores_gemma":[0.99934167,0.00010820141,0.00010606622,0.00010994392,0.00029639257,0.00003775756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090075773,0.00089080416,0.00071925326,0.0021375439,0.0009107353,0.0010517992,0.0010369903,0.00122453,0.00494413],"category_scores_gemma":[0.0010189115,0.00034821744,0.0006521272,0.0010391517,0.0007674697,0.0021525885,0.0012494636,0.0015250854,0.003754734],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002300047,0.0002824367,0.002036032,0.0037306526,0.00009567188,0.0006674959,0.00022736214,0.0019799282,0.5915173,0.024823288,0.018935777,0.35547403],"study_design_scores_gemma":[0.000045580102,0.0005149997,0.0023665642,0.00030395197,0.0001316736,0.0025736678,0.00026208645,0.006097786,0.7150681,0.008735858,0.26377937,0.00012034049],"about_ca_topic_score_codex":0.0003734126,"about_ca_topic_score_gemma":0.0006633119,"teacher_disagreement_score":0.00494413,"about_ca_system_score_codex":0.0005730204,"about_ca_system_score_gemma":0.0008318492,"threshold_uncertainty_score":0.016539693},"labels":[],"label_agreement":null},{"id":"W1189151426","doi":"10.1016/j.ijepes.2015.07.035","title":"Home energy management incorporating operational priority of appliances","year":2015,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Demand response; Electricity; Scheduling (production processes); Load management; Energy management; Computer science; Electricity market; Operations research; Reliability (semiconductor); Load shifting; Energy consumption; Environmental economics; Operational costs; Consumption (sociology); Energy management system; Reliability engineering; Business; Operations management; Energy (signal processing); Engineering; Economics; Electrical engineering; Power (physics)","score_opus":0.010324271663768498,"score_gpt":0.22221719816217655,"score_spread":0.21189292649840805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1189151426","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5113019,0.00047386618,0.45845938,0.00033181603,0.00027388366,0.00013839791,0.000179825,0.0010234377,0.027817575],"genre_scores_gemma":[0.9900149,0.00003782412,0.008961096,0.000015368512,0.00002054362,0.0000044878047,0.000034781497,0.000016968439,0.00089402427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998235,0.00003324007,0.000012588854,0.00004332616,0.00004930395,0.000037929258],"domain_scores_gemma":[0.99964535,0.000103796076,0.00004216849,0.000029836534,0.0001380442,0.000040869192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038523015,0.00035579441,0.00041582604,0.0004912159,0.000270259,0.0010439487,0.0003445722,0.00017719416,0.0015563634],"category_scores_gemma":[0.00090568553,0.00013014843,0.00015500706,0.00036037783,0.00011210329,0.0008206169,0.00026295212,0.00032556555,0.00019455251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013555118,0.001348558,0.043750834,0.00022103557,0.00021358888,0.00031845854,0.00030970233,0.27892166,0.05254365,0.015682556,0.005525822,0.59980863],"study_design_scores_gemma":[0.000031485444,0.00022995354,0.016962409,0.000016476119,0.000096446674,0.00011670951,0.00020403281,0.9623557,0.012254789,0.0056520277,0.0020597312,0.000020191123],"about_ca_topic_score_codex":0.0012007985,"about_ca_topic_score_gemma":0.003028107,"teacher_disagreement_score":0.0015563634,"about_ca_system_score_codex":0.0002829568,"about_ca_system_score_gemma":0.00037848178,"threshold_uncertainty_score":0.005206585},"labels":[],"label_agreement":null},{"id":"W122953829","doi":"","title":"Emission Impossible: Positively Shocking Solutions for Abating Greenhouse Gas Emissions from Canada’s Electric Power Industry","year":2013,"lang":"en","type":"article","venue":"Summit (Simon Fraser University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Electric power industry; Electric power; Environmental science; Power (physics); Engineering; Electricity; Electrical engineering; Physics; Thermodynamics; Ecology","score_opus":0.010068169989135928,"score_gpt":0.18215736353649128,"score_spread":0.17208919354735536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W122953829","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38700032,0.0029184797,0.034620013,0.047877718,0.0004670075,0.0003599258,0.0013146894,0.00086681213,0.524575],"genre_scores_gemma":[0.96046454,0.0014605197,0.010952938,0.0015109642,0.000041398893,0.00004207827,0.0002979018,0.000052755033,0.02517677],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990614,0.00016325823,0.0000142337085,0.000060312643,0.0003786626,0.0003221769],"domain_scores_gemma":[0.9993736,0.00009763485,0.000056903547,0.000033969554,0.00029153,0.00014633781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000723528,0.0003752284,0.00019067476,0.00060946756,0.002601194,0.0025975446,0.000893753,0.00078248186,0.0074973414],"category_scores_gemma":[0.002556435,0.00012456508,0.00031902318,0.0009318938,0.0016992012,0.0008879767,0.0014565818,0.0010413557,0.00034774753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000536567,0.00065901957,0.05419569,0.00098563,0.00016391705,0.00078342797,0.0018079848,0.07799201,0.011338964,0.40447846,0.106528856,0.3405295],"study_design_scores_gemma":[0.00041691412,0.0005491365,0.14657027,0.0007847002,0.0005910041,0.0004837778,0.017882645,0.13894232,0.024816807,0.15280457,0.5159097,0.0002481806],"about_ca_topic_score_codex":0.83275336,"about_ca_topic_score_gemma":0.94106495,"teacher_disagreement_score":0.16724664,"about_ca_system_score_codex":0.014137825,"about_ca_system_score_gemma":0.048576377,"threshold_uncertainty_score":0.33646315},"labels":[],"label_agreement":null},{"id":"W1272474793","doi":"10.1007/s12053-014-9306-2","title":"Nonintrusive load monitoring (NILM) performance evaluation","year":2014,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Popularity; Power (physics); Computer science; Process (computing); Electricity meter; Metre; SIGNAL (programming language); Reliability engineering; Engineering","score_opus":0.007915506415731681,"score_gpt":0.2043547913776673,"score_spread":0.1964392849619356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1272474793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92315686,0.0003448203,0.061922602,0.00013837065,0.00007406674,0.00021297002,0.00038953958,0.0024895382,0.011271154],"genre_scores_gemma":[0.9925041,0.000047901252,0.0055146785,0.000018171297,0.000012452819,0.000031057807,0.00015630055,0.000036417725,0.00167885],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9984091,0.00045101298,0.000079964855,0.00020695939,0.00067667826,0.00017637112],"domain_scores_gemma":[0.997106,0.0013027887,0.00026905406,0.0004604322,0.00071482547,0.00014675906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012182978,0.00074629247,0.0006093802,0.0006096686,0.00038162572,0.00068106886,0.0008949541,0.0004610375,0.002318512],"category_scores_gemma":[0.0032988614,0.00013741331,0.00020715318,0.00048187934,0.00028769052,0.0008567942,0.00069170666,0.0003346,0.000569676],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010978247,0.003403631,0.05232087,0.0010772158,0.00023959472,0.0004600111,0.00053390063,0.2270912,0.1371865,0.0028228583,0.004554614,0.55933136],"study_design_scores_gemma":[0.00015548235,0.0061434936,0.044335105,0.000036776495,0.00012210305,0.00047249414,0.00026398894,0.81842554,0.12556034,0.00077208166,0.0036515472,0.00006110229],"about_ca_topic_score_codex":0.0016085261,"about_ca_topic_score_gemma":0.0017578983,"teacher_disagreement_score":0.002318512,"about_ca_system_score_codex":0.00053753814,"about_ca_system_score_gemma":0.00044956588,"threshold_uncertainty_score":0.0077561736},"labels":[],"label_agreement":null},{"id":"W140534614","doi":"10.1007/978-3-319-11032-5_8","title":"Computing a Model for Asset Management with Risk","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brock University","funders":"","keywords":"Asset (computer security); Computer science; Asset management; Operations research; Risk analysis (engineering); Actuarial science; Business; Engineering; Finance; Computer security","score_opus":0.009930648884383676,"score_gpt":0.17728258087857135,"score_spread":0.16735193199418769,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W140534614","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063130576,0.0020209183,0.9240399,0.0024889507,0.0005264937,0.000044378212,0.00032701044,0.00062015885,0.06361913],"genre_scores_gemma":[0.30043492,0.0072674383,0.5960649,0.00079685875,0.00070824556,0.0003332709,0.0012212046,0.00097549835,0.09219771],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976474,0.00006132228,0.00001418349,0.00004297523,0.00009865915,0.000018107101],"domain_scores_gemma":[0.99969375,0.00017456578,0.000012969874,0.0000660075,0.000037588678,0.000015121729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039964166,0.00095044373,0.00066925224,0.0003119644,0.00052147347,0.0019572433,0.0012224639,0.0007414907,0.010797898],"category_scores_gemma":[0.0016386003,0.0003786175,0.0008555675,0.0008613758,0.00087425817,0.0036664004,0.0010100824,0.0021888565,0.0017989897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021378788,0.000029309978,0.00015917813,0.00009877056,0.000020075757,0.000041864423,0.000057846173,0.18882972,0.00045476895,0.7339257,0.015608184,0.060753174],"study_design_scores_gemma":[0.00000499977,0.0000041452836,0.000034812787,0.000025099498,0.000006217807,0.000022142434,0.000013322452,0.3187467,0.00028469326,0.66378844,0.017063208,0.0000062099307],"about_ca_topic_score_codex":0.0027391945,"about_ca_topic_score_gemma":0.0029001252,"teacher_disagreement_score":0.010797898,"about_ca_system_score_codex":0.0013707659,"about_ca_system_score_gemma":0.0007220704,"threshold_uncertainty_score":0.03612256},"labels":[],"label_agreement":null},{"id":"W1491459318","doi":"10.20381/ruor-5165","title":"Adaptive Systems for Smart Buildings Utilizing Wireless Sensor Networks and Artificial Intelligence","year":2012,"lang":"en","type":"dissertation","venue":"uO Research (University of Ottawa)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Reinforcement learning; Wireless sensor network; Computer science; Thermostat; Schedule; Artificial intelligence; Wireless; Distributed computing; Building automation; Engineering; Real-time computing; Control engineering; Computer network; Telecommunications; Electrical engineering","score_opus":0.06570154163195144,"score_gpt":0.28100875918402,"score_spread":0.21530721755206858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1491459318","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01184454,0.0018060353,0.97891897,0.00023735662,0.000116156945,0.000053993583,0.000017855868,0.00028816785,0.0067170216],"genre_scores_gemma":[0.69351727,0.005305259,0.29012215,0.0002129422,0.00021815523,0.0002579394,0.000119927325,0.00005191826,0.010194372],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998317,0.00004569506,0.000010448701,0.000034564197,0.000064456224,0.000013037084],"domain_scores_gemma":[0.999846,0.000079139056,0.000018750641,0.000017274788,0.000033533877,0.000005424133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030920765,0.00048419577,0.00040315106,0.00025496315,0.0002386302,0.00077222136,0.00048689588,0.0005500784,0.0013126238],"category_scores_gemma":[0.00057417265,0.00015248905,0.00040514194,0.00037002997,0.00040286238,0.00092100835,0.0005770032,0.000806394,0.00031555723],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006179313,0.0000764627,0.0008008138,0.00034002043,0.00008733238,0.00015516148,0.00017704358,0.7069817,0.021261172,0.06686094,0.0015985564,0.20159908],"study_design_scores_gemma":[0.000008852023,0.0000727578,0.00025783636,0.000026887492,0.000015198954,0.000056852085,0.000030467318,0.9750557,0.0023906024,0.014233966,0.007839361,0.000011425528],"about_ca_topic_score_codex":0.0010928509,"about_ca_topic_score_gemma":0.0013650891,"teacher_disagreement_score":0.0013126238,"about_ca_system_score_codex":0.0003423303,"about_ca_system_score_gemma":0.0003275156,"threshold_uncertainty_score":0.004391134},"labels":[],"label_agreement":null},{"id":"W1493111803","doi":"10.5772/17297","title":"Demand Management and Wireless Sensor Networks in the Smart Grid","year":2011,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Environmental economics; Inefficiency; Demand response; Grid; Smart grid; Resilience (materials science); Electricity; Greenhouse gas; Electricity generation; Population; Electricity demand; Business; Engineering; Natural resource economics; Power (physics); Electrical engineering; Economics; Geography; Market economy","score_opus":0.01363101345548112,"score_gpt":0.1819275154901808,"score_spread":0.16829650203469967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493111803","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015393393,0.51337135,0.115442164,0.017211292,0.005107864,0.00007009729,0.00031082044,0.00047055556,0.33262253],"genre_scores_gemma":[0.21411778,0.5300683,0.037237402,0.002565113,0.0047562495,0.0001307693,0.00044842318,0.00015314484,0.2105229],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998242,0.000050601302,0.0000067827286,0.000026391577,0.00007753108,0.0000145324675],"domain_scores_gemma":[0.9999027,0.000054500695,0.000008645049,0.000010495805,0.000015802614,0.000007668328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025110753,0.00062108965,0.00044203174,0.00035041905,0.00022036796,0.0011841599,0.00042846694,0.001023883,0.0032962174],"category_scores_gemma":[0.0003554364,0.0002688599,0.0002316418,0.0014530096,0.0006528585,0.0029165875,0.00062561315,0.001185718,0.0012095004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073578034,0.00012668932,0.0004286948,0.0010196334,0.000050970142,0.00028439032,0.00029463493,0.062944114,0.0028194115,0.44268733,0.094153576,0.39511696],"study_design_scores_gemma":[0.000015474829,0.00008997335,0.000907295,0.00042143548,0.000020153764,0.0004213133,0.00030630463,0.061266262,0.00091861555,0.37328324,0.5623145,0.00003552884],"about_ca_topic_score_codex":0.00088695186,"about_ca_topic_score_gemma":0.0012999548,"teacher_disagreement_score":0.0032962174,"about_ca_system_score_codex":0.000469226,"about_ca_system_score_gemma":0.0003130981,"threshold_uncertainty_score":0.0110269785},"labels":[],"label_agreement":null},{"id":"W1503631732","doi":"10.4271/2008-01-3004","title":"3 Load Cell Tumble Meter Development","year":2008,"lang":"en","type":"article","venue":"SAE technical papers on CD-ROM/SAE technical paper series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Chrysler (Canada)","funders":"","keywords":"Metre; Computer science; Physics","score_opus":0.012086059073909165,"score_gpt":0.2007219074593392,"score_spread":0.18863584838543004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1503631732","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018171038,0.00070713955,0.8115128,0.0011903764,0.0010342706,0.001586965,0.0065307324,0.05690182,0.10236483],"genre_scores_gemma":[0.14166804,0.0010429595,0.5659941,0.0021352742,0.00044649406,0.0021838823,0.016731462,0.0072916034,0.26250622],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9978998,0.00012568448,0.00006104094,0.00017503196,0.0016425664,0.00009583755],"domain_scores_gemma":[0.9982974,0.0001197775,0.00005273868,0.00017959773,0.0012727004,0.00007783708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011789427,0.0008835496,0.0006388784,0.00189275,0.00055962376,0.0015678612,0.0025592234,0.0011561331,0.041516602],"category_scores_gemma":[0.0019361232,0.00073457987,0.00058759196,0.0009934907,0.00023047047,0.0020141974,0.0011977575,0.0015990493,0.033792604],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041437944,0.00030349393,0.00405337,0.00054671435,0.000037790156,0.0005548009,0.00041126882,0.0062495065,0.2190382,0.015491341,0.13699895,0.6159002],"study_design_scores_gemma":[0.00008462886,0.0003064866,0.003418776,0.000076493445,0.000026991907,0.000930776,0.00007842155,0.04318029,0.30556628,0.0014264992,0.6447541,0.00015033344],"about_ca_topic_score_codex":0.0033820758,"about_ca_topic_score_gemma":0.0029030142,"teacher_disagreement_score":0.041516602,"about_ca_system_score_codex":0.0011261114,"about_ca_system_score_gemma":0.0013845019,"threshold_uncertainty_score":0.13888687},"labels":[],"label_agreement":null},{"id":"W1504815797","doi":"10.1109/iccchinaw.2014.7107861","title":"Optimizing residential energy consumption: the need for pareto optimality","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Pareto principle; Smart grid; Energy consumption; Multi-objective optimization; Profit (economics); Pareto optimal; Consumption (sociology); Grid; Simple (philosophy); Mathematical optimization; Operations research; Engineering; Machine learning; Economics; Microeconomics","score_opus":0.01608750721372897,"score_gpt":0.21762896903361617,"score_spread":0.2015414618198872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1504815797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008980999,0.0015771007,0.97017324,0.0019779596,0.000045952413,0.000066883396,0.000037868915,0.00006450553,0.017075552],"genre_scores_gemma":[0.45180604,0.0055498364,0.5334209,0.00085038145,0.00018493987,0.0002773454,0.000076558164,0.00016950203,0.007664503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99717915,0.0015991986,0.000094408664,0.00021148888,0.0007533587,0.0001624236],"domain_scores_gemma":[0.9975253,0.0018254366,0.00013431694,0.00017852048,0.00027980097,0.000056563596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038646027,0.0010455273,0.0013568456,0.0006254513,0.000876668,0.0025448762,0.0010472494,0.0014375672,0.0013430767],"category_scores_gemma":[0.006282524,0.00058092026,0.0010452135,0.0013069174,0.001997263,0.0029380356,0.0013767653,0.0022968517,0.00032572576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026005962,0.0000951852,0.0005279624,0.00021357248,0.000055785884,0.00009041421,0.0001737963,0.5792396,0.0007813695,0.3641418,0.0022977227,0.0523568],"study_design_scores_gemma":[0.000021232916,0.00006767618,0.00037863318,0.00011511457,0.000022374452,0.00007324682,0.00017845591,0.63908595,0.0011306384,0.34973463,0.009164804,0.000027309585],"about_ca_topic_score_codex":0.003914645,"about_ca_topic_score_gemma":0.0055299858,"teacher_disagreement_score":0.003914645,"about_ca_system_score_codex":0.0018326044,"about_ca_system_score_gemma":0.0034271914,"threshold_uncertainty_score":0.020438194},"labels":[],"label_agreement":null},{"id":"W1510732983","doi":"10.1109/greentech.2015.29","title":"Fairness-Aware Game Theoretic Approach for Demand Response in Microgrids","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Demand response; Shapley value; Computer science; Smart grid; Context (archaeology); Grid; Game theory; Distributed generation; Electric power system; Cooperative game theory; Mathematical optimization; Operations research; Power (physics); Electricity; Microeconomics; Economics","score_opus":0.01856743231817886,"score_gpt":0.22301843564815957,"score_spread":0.2044510033299807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1510732983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020269655,0.00008646253,0.9743149,0.00024342973,0.000044558397,0.000108524655,0.000048235113,0.000093756316,0.004790404],"genre_scores_gemma":[0.8743646,0.00015746051,0.121117495,0.00013763031,0.000053787022,0.00013727142,0.000057229514,0.000048749414,0.0039256974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876606,0.00066105905,0.000039247196,0.000158819,0.00023015635,0.00014468734],"domain_scores_gemma":[0.99839956,0.0010283988,0.00011191613,0.0000990114,0.00021884465,0.00014229836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024462373,0.0007121952,0.00094193185,0.0005021184,0.0008409034,0.0014677808,0.0017682365,0.0010366648,0.0035012534],"category_scores_gemma":[0.0043809637,0.0003097275,0.0006078702,0.000697912,0.0011682571,0.0020370123,0.0012538114,0.0016008011,0.00027408518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009790506,0.00009893942,0.0003589815,0.000070822396,0.00002803179,0.00008569453,0.00012588175,0.8628409,0.0014030186,0.11707995,0.0010621086,0.016747797],"study_design_scores_gemma":[0.0000104044075,0.000022092061,0.000033591892,0.0000032621517,0.0000039727333,0.000014436509,0.000019830542,0.9723384,0.00026501893,0.026873471,0.00041011287,0.0000055089913],"about_ca_topic_score_codex":0.0027591886,"about_ca_topic_score_gemma":0.0026910421,"teacher_disagreement_score":0.0035012534,"about_ca_system_score_codex":0.0021447774,"about_ca_system_score_gemma":0.00180001,"threshold_uncertainty_score":0.015561581},"labels":[],"label_agreement":null},{"id":"W1518849528","doi":"10.1109/hicss.2015.313","title":"Optimization of Customer Subscription Rates to Electric Utility Tariffs","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Laboratory Directed Research and Development; Pacific Northwest National Laboratory; University of Victoria; Battelle; U.S. Department of Energy","keywords":"Tariff; Electricity; Computer science; Electricity price; Environmental economics; Microeconomics; Operations research; Business; Mathematical optimization; Economics; Engineering; International economics; Electrical engineering","score_opus":0.020774310452331687,"score_gpt":0.21969815257612516,"score_spread":0.19892384212379347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1518849528","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7768073,0.00027538222,0.20345251,0.00039827445,0.00005991765,0.00027382167,0.00026153337,0.00042156104,0.018049616],"genre_scores_gemma":[0.97796905,0.00008140908,0.019573756,0.0000266988,0.000009391729,0.000054550645,0.00007782205,0.000047472276,0.0021598227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990221,0.0005072881,0.00002978008,0.000111436835,0.00015188847,0.00017752516],"domain_scores_gemma":[0.99705184,0.0022864402,0.00020786167,0.00011439432,0.00021739677,0.000122087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002654444,0.0006676717,0.0007621036,0.00045859214,0.00022440289,0.0011620467,0.00085930584,0.0007099691,0.0030064334],"category_scores_gemma":[0.009053039,0.00061209383,0.00051158917,0.0007808011,0.0003590105,0.00092932914,0.0004995336,0.0009482354,0.0002643966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002487483,0.00011462918,0.0009915326,0.000020883468,0.00001658546,0.000030418085,0.000019320976,0.97962403,0.0011138838,0.0032709795,0.00035179037,0.014197103],"study_design_scores_gemma":[0.00003502476,0.00008404328,0.00047251047,0.0000025748677,0.000009368577,0.0000136531335,0.000019848643,0.9968622,0.0009165424,0.0012325026,0.0003451533,0.0000065487966],"about_ca_topic_score_codex":0.004267039,"about_ca_topic_score_gemma":0.0031937335,"teacher_disagreement_score":0.004267039,"about_ca_system_score_codex":0.0014231299,"about_ca_system_score_gemma":0.0009671062,"threshold_uncertainty_score":0.014038205},"labels":[],"label_agreement":null},{"id":"W1526600169","doi":"10.1109/ihtc.2014.7147535","title":"A Consumer Bill of Rights for Energy Conservation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; University of British Columbia; Government of British Columbia; Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada; University of British Columbia; U.S. Consumer Product Safety Commission","keywords":"Energy conservation; Environmental economics; Work (physics); Purchasing; Business; Energy consumption; Government (linguistics); Consumption (sociology); Power (physics); Purchasing power; Economics; Marketing; Engineering","score_opus":0.007114710934369648,"score_gpt":0.1772176588999333,"score_spread":0.17010294796556363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1526600169","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067000096,0.0006643937,0.027351469,0.054866917,0.0012415143,0.00019835385,0.00024705814,0.0004769702,0.9082534],"genre_scores_gemma":[0.28131595,0.0018213403,0.04893407,0.07072646,0.0016058976,0.00081700436,0.000583622,0.0005756186,0.5936201],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9950098,0.0010207712,0.00019857885,0.000667778,0.0026098457,0.0004932306],"domain_scores_gemma":[0.9972494,0.0006923833,0.00016680073,0.00087545277,0.0007954177,0.00022050373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033646068,0.0005676651,0.00038676956,0.00093689136,0.0026277693,0.0058963406,0.0011067237,0.011059684,0.029108876],"category_scores_gemma":[0.008424398,0.0005367502,0.0010045173,0.0010665541,0.004949874,0.007812547,0.0039182855,0.0058894577,0.006527977],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014919095,0.000042300064,0.00045604978,0.000026199737,0.0000056005006,0.00009159305,0.00037424496,0.00020510636,0.00044663736,0.9380279,0.044594303,0.015715258],"study_design_scores_gemma":[0.000035577585,0.000034137058,0.0007502518,0.00011793891,0.000014535809,0.00031578258,0.0003117435,0.00095208234,0.00049266266,0.1100285,0.88691014,0.00003661331],"about_ca_topic_score_codex":0.0036750084,"about_ca_topic_score_gemma":0.0055861385,"teacher_disagreement_score":0.029108876,"about_ca_system_score_codex":0.0021914772,"about_ca_system_score_gemma":0.003795685,"threshold_uncertainty_score":0.09737891},"labels":[],"label_agreement":null},{"id":"W1532109353","doi":"10.1002/wene.120","title":"Who gains from hourly time‐of‐use retail prices on electricity? An analysis of consumption profiles for categories of Danish electricity customers","year":2014,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Electricity; Consumption (sociology); Danish; Environmental economics; Power consumption; Electricity retailing; Environmental science; Business; Agricultural economics; Electricity market; Economics; Engineering; Power (physics); Electrical engineering","score_opus":0.020990381564097545,"score_gpt":0.24171783968628394,"score_spread":0.2207274581221864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1532109353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99773324,0.00009961044,0.00015231133,0.00009562903,0.0000032111004,0.0000037776736,0.0003432726,0.000002384606,0.0015664975],"genre_scores_gemma":[0.9993673,0.00004474521,0.000035010627,0.000009276186,0.0000013130607,0.0000013335401,0.000263659,0.0000017056026,0.00027566607],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999057,0.00024018639,0.000060022205,0.00014802323,0.00023777013,0.0002570832],"domain_scores_gemma":[0.99793917,0.0011070956,0.0003731909,0.00016130842,0.000223749,0.00019539776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079178193,0.00010008471,0.00033974426,0.00061866094,0.00031545796,0.0016431465,0.00037467948,0.00045956887,0.002663636],"category_scores_gemma":[0.0037784118,0.00020175033,0.00055787823,0.0013348451,0.00037901493,0.00087783753,0.0006228809,0.00043734442,0.0005296867],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008797409,0.000120300516,0.95663303,0.000041237603,0.00017525336,0.00053228845,0.0018691055,0.004404124,0.00081678526,0.0026692296,0.0012949161,0.030564073],"study_design_scores_gemma":[0.0000064388346,0.000056299545,0.98669994,0.000015448171,0.000035929315,0.00035053678,0.004141268,0.005775435,0.0003004371,0.00092800526,0.0016639971,0.000026321717],"about_ca_topic_score_codex":0.012631751,"about_ca_topic_score_gemma":0.0110373795,"teacher_disagreement_score":0.012631751,"about_ca_system_score_codex":0.0008404363,"about_ca_system_score_gemma":0.00033301295,"threshold_uncertainty_score":0.025116444},"labels":[],"label_agreement":null},{"id":"W1542090993","doi":"10.1109/ccece.2015.7129380","title":"Electrical grid peak reduction with efficient and flexible automated demand response scheduling","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Electricity; Smart grid; Computer science; Scheduling (production processes); Reduction (mathematics); Incentive; Grid; Energy consumption; Consumption (sociology); Response time; Load management; Real-time computing; Distributed computing; Mathematical optimization; Electrical engineering; Microeconomics; Economics; Engineering; Mathematics; Operating system","score_opus":0.01113297043383362,"score_gpt":0.21400129951788535,"score_spread":0.20286832908405172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1542090993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56439346,0.00032397083,0.423024,0.00047402587,0.00006994009,0.00011876874,0.00012989585,0.0011783587,0.010287532],"genre_scores_gemma":[0.9883554,0.000022363205,0.011173331,0.000024148425,0.000007961848,0.000015132395,0.000016533337,0.000011614431,0.0003734427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994972,0.0001550458,0.000020711153,0.00008256398,0.0001289959,0.000115371],"domain_scores_gemma":[0.9992242,0.00033504222,0.00015381172,0.00013481543,0.000099065786,0.000053049054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065612484,0.00051487563,0.00058968156,0.00028339605,0.00037678963,0.0006022758,0.00091852434,0.0004673207,0.00078868924],"category_scores_gemma":[0.0018869234,0.00022485823,0.0002519308,0.0005798189,0.00040697638,0.00062144996,0.00055637595,0.000458607,0.00013623547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013951852,0.00009958813,0.0011358601,0.000017610933,0.000016044774,0.000052526273,0.0000364506,0.9755508,0.0025404273,0.0021630218,0.0005794469,0.01766884],"study_design_scores_gemma":[0.000027436343,0.00004180145,0.0004790273,0.0000012115298,0.0000064160013,0.000014870038,0.000021137428,0.99679714,0.0007238523,0.001610855,0.00027003395,0.000006271446],"about_ca_topic_score_codex":0.0064426973,"about_ca_topic_score_gemma":0.006864178,"teacher_disagreement_score":0.0064426973,"about_ca_system_score_codex":0.0006629422,"about_ca_system_score_gemma":0.0009602843,"threshold_uncertainty_score":0.012810409},"labels":[],"label_agreement":null},{"id":"W1549040031","doi":"","title":"Proceedings of the Fourth ACM Workshop on Embedded Sensing Systems for Energy-Efficiency in Buildings","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variety (cybernetics); Architectural engineering; Globe; Pleasure; Efficient energy use; Electricity; Domain (mathematical analysis); Energy (signal processing); Computer science; Engineering; Engineering management; Electrical engineering; Psychology","score_opus":0.017131028861628813,"score_gpt":0.22088458021182295,"score_spread":0.20375355135019413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1549040031","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027428987,0.058990136,0.6725655,0.0413364,0.048042346,0.00071884406,0.0014433567,0.0033751696,0.14609922],"genre_scores_gemma":[0.30882785,0.04357558,0.20882185,0.005081999,0.020060629,0.00059210695,0.004406771,0.0019619449,0.40667126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99805474,0.00071382965,0.00012179851,0.00023515662,0.00070224685,0.0001722163],"domain_scores_gemma":[0.9971602,0.0009614382,0.000057295074,0.0003635943,0.0011042062,0.00035330854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004461184,0.0011581382,0.0011018588,0.00082164776,0.0007400196,0.0037575641,0.0017427183,0.0015319634,0.022721188],"category_scores_gemma":[0.0043257535,0.00045871787,0.0007868797,0.00075437804,0.0011506162,0.0026495857,0.001997742,0.0031005116,0.0055680973],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005992865,0.00039271524,0.0022256197,0.00052665593,0.00020346002,0.0004222894,0.0008074655,0.010053087,0.008624284,0.022492137,0.5315812,0.4220719],"study_design_scores_gemma":[0.000060017715,0.0002526074,0.0024310527,0.00033808456,0.0001018522,0.00035958312,0.0006654617,0.044855997,0.0060872776,0.015723892,0.92906225,0.00006196175],"about_ca_topic_score_codex":0.004759512,"about_ca_topic_score_gemma":0.00906891,"teacher_disagreement_score":0.022721188,"about_ca_system_score_codex":0.0011159562,"about_ca_system_score_gemma":0.0015610015,"threshold_uncertainty_score":0.07600999},"labels":[],"label_agreement":null},{"id":"W1569380606","doi":"","title":"Storage-based smart grid communication framework","year":2012,"lang":"en","type":"article","venue":"World Congress on Sustainable Technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Smart grid; Computer science; Grid; Distributed computing; Renewable energy; Distributed generation; Energy storage; Demand response; Stochastic optimization; Optimization problem; Mathematical optimization; Electrical engineering; Engineering; Electricity; Power (physics); Algorithm","score_opus":0.009465052008330081,"score_gpt":0.22223301254336134,"score_spread":0.21276796053503125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1569380606","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009742871,0.0006642869,0.9294754,0.0019029498,0.00021703765,0.00008721093,0.00032147733,0.0004781497,0.057110608],"genre_scores_gemma":[0.7731034,0.0018635594,0.18473098,0.00057367975,0.0003280058,0.00032810465,0.00039157542,0.00010728399,0.038573366],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961084,0.00011488376,0.0000206312,0.00007719951,0.00012994531,0.000046644658],"domain_scores_gemma":[0.9997142,0.00010245562,0.000023863882,0.000062906234,0.00007042942,0.000026144964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050012534,0.0004850862,0.00048724393,0.0003152502,0.0005522915,0.0015705694,0.0013437414,0.0012908845,0.0077418317],"category_scores_gemma":[0.00074285,0.00020392724,0.00048381608,0.00070018845,0.00087919936,0.002976532,0.0012918955,0.0010464974,0.0012219195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024107541,0.000023392631,0.000099823825,0.000050152943,0.000011160685,0.00014922839,0.000056778183,0.14994432,0.0008346016,0.8345926,0.003239401,0.010974419],"study_design_scores_gemma":[0.000025203577,0.000027624279,0.00005640972,0.00001647966,0.000011501794,0.00012566471,0.00005509353,0.63812244,0.0007733197,0.34008372,0.02068923,0.000013364345],"about_ca_topic_score_codex":0.0024710898,"about_ca_topic_score_gemma":0.0023551714,"teacher_disagreement_score":0.0077418317,"about_ca_system_score_codex":0.000873324,"about_ca_system_score_gemma":0.0010924725,"threshold_uncertainty_score":0.025899053},"labels":[],"label_agreement":null},{"id":"W1588980792","doi":"10.1109/isgt.2015.7131790","title":"Distributed sustainable generation dispatch via evolutionary games","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Scalability; Economic dispatch; Overhead (engineering); Provisioning; Smart grid; Grid; Distributed computing; Carbon footprint; Variable (mathematics); Electric power system; Wind power; Distributed generation; Mathematical optimization; Power (physics); Renewable energy; Engineering; Telecommunications; Ecology","score_opus":0.012771717211714502,"score_gpt":0.1937124536605467,"score_spread":0.1809407364488322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1588980792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.077125564,0.00016540183,0.904033,0.000563473,0.00006551306,0.00012879985,0.0000905966,0.00014186872,0.017685764],"genre_scores_gemma":[0.9337725,0.00015208805,0.058685925,0.00009149556,0.000020765729,0.00019179985,0.00006808521,0.000024565132,0.0069926977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967086,0.00015335937,0.000012012367,0.000042624997,0.000072552946,0.000048552058],"domain_scores_gemma":[0.9993782,0.0004102679,0.00006315478,0.000024480816,0.00006557601,0.000058397363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068675505,0.00068120647,0.000755618,0.000381361,0.00044480714,0.0010112379,0.00091617974,0.0008885789,0.0025073863],"category_scores_gemma":[0.0021022072,0.00036611754,0.00046539446,0.0004185215,0.0007716255,0.00076195435,0.0009163382,0.00082950544,0.00020222487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017575923,0.00001216331,0.00013301913,0.00000844506,0.000008717748,0.00003943653,0.000016813614,0.975605,0.00022705438,0.020527331,0.00025712588,0.0031472628],"study_design_scores_gemma":[0.00000556902,0.000005070326,0.00001941165,9.649395e-7,0.0000010622155,0.0000033678934,0.0000034832954,0.9946622,0.000027790898,0.005122143,0.0001476795,0.0000012559839],"about_ca_topic_score_codex":0.0048384657,"about_ca_topic_score_gemma":0.004783494,"teacher_disagreement_score":0.0048384657,"about_ca_system_score_codex":0.0012751337,"about_ca_system_score_gemma":0.0010048274,"threshold_uncertainty_score":0.009620607},"labels":[],"label_agreement":null},{"id":"W1608132282","doi":"10.1109/icde.2015.7113405","title":"SMAS: A smart meter data analytics system","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart meter; Analytics; Computer science; Electricity; Electricity meter; Metre; Data analysis; Big data; Domain (mathematical analysis); Smart grid; Data science; Database; Data mining; Engineering; Electrical engineering","score_opus":0.10085822949734728,"score_gpt":0.2364757872674757,"score_spread":0.1356175577701284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1608132282","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022979988,0.000315001,0.13868156,0.0009484252,0.00028527188,0.00061259296,0.03882549,0.7783688,0.018982897],"genre_scores_gemma":[0.56938016,0.0006307739,0.22299516,0.0028564488,0.00045313683,0.0013182338,0.15087833,0.023371588,0.028116174],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845827,0.00022255178,0.00017506146,0.00041019,0.00062761974,0.00010625409],"domain_scores_gemma":[0.99778086,0.0004981012,0.00023995829,0.0006975603,0.00047899364,0.0003045441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016305309,0.001140028,0.0011146171,0.002097538,0.0005077907,0.0019162428,0.0024788692,0.00067642314,0.024966078],"category_scores_gemma":[0.004986808,0.000835331,0.0006188815,0.0017337805,0.00054937624,0.0033690676,0.002710134,0.001654795,0.01402944],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028341184,0.0009367061,0.01900911,0.001025886,0.0004855958,0.0009132959,0.00087646313,0.024732368,0.03698557,0.018828887,0.6343384,0.25903356],"study_design_scores_gemma":[0.0008875014,0.0005643921,0.01804788,0.00019449384,0.00018118777,0.00078767753,0.00032294024,0.47411394,0.045340545,0.024805002,0.43439808,0.0003563341],"about_ca_topic_score_codex":0.0031447175,"about_ca_topic_score_gemma":0.0022712057,"teacher_disagreement_score":0.024966078,"about_ca_system_score_codex":0.0008740662,"about_ca_system_score_gemma":0.0013846232,"threshold_uncertainty_score":0.083519876},"labels":[],"label_agreement":null},{"id":"W1609312154","doi":"10.1109/pess.2002.1043647","title":"Web-based transaction operational feasibility analysis in electricity markets","year":2003,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Database transaction; Computer science; Electricity; Web application; Transaction processing; Architecture; Electricity market; Database; Distributed computing; World Wide Web; Engineering","score_opus":0.009416826029162387,"score_gpt":0.2104299257049419,"score_spread":0.20101309967577952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1609312154","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06904269,0.00021677678,0.92042154,0.00025954287,0.00002554921,0.0001364503,0.00011490036,0.0003141492,0.009468358],"genre_scores_gemma":[0.8586384,0.00022916964,0.13848148,0.000042786258,0.00005074471,0.00023685163,0.0001841897,0.00006229818,0.0020739727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99746823,0.0013944987,0.0001288833,0.00013135551,0.00073702907,0.00014009642],"domain_scores_gemma":[0.99050343,0.007523396,0.0004589682,0.00031990488,0.0010682929,0.00012606576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030720078,0.0003804813,0.0005431711,0.0017137399,0.00050585397,0.0024180436,0.0006081203,0.0006628961,0.006391439],"category_scores_gemma":[0.014993091,0.00034570476,0.0005110535,0.0017146212,0.0010831754,0.004762716,0.00083380094,0.00078224926,0.0006418503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035869866,0.0001590106,0.0031502342,0.0001455819,0.0000528226,0.00061589957,0.00017663017,0.5574212,0.0026415219,0.33547044,0.0021871955,0.09762079],"study_design_scores_gemma":[0.000009042902,0.000014938359,0.00019208883,0.000006750979,0.0000032221603,0.000039574952,0.000035572226,0.9510322,0.0004062046,0.04771511,0.0005390837,0.0000062593026],"about_ca_topic_score_codex":0.0028719734,"about_ca_topic_score_gemma":0.0011509955,"teacher_disagreement_score":0.006391439,"about_ca_system_score_codex":0.00067829224,"about_ca_system_score_gemma":0.0007759798,"threshold_uncertainty_score":0.021381497},"labels":[],"label_agreement":null},{"id":"W1613154166","doi":"10.1109/pesgm.2015.7286405","title":"Smart distribution system operations with price-responsive and controllable loads","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controllability; Load management; Scheduling (production processes); Demand response; Computer science; Minification; Load profile; Smart grid; Load regulation; Mathematical optimization; Engineering; Electrical engineering; Voltage; Electricity; Mathematics","score_opus":0.006938234731053367,"score_gpt":0.17083466610014725,"score_spread":0.16389643136909388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1613154166","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.147836,0.000094900905,0.831264,0.00027889814,0.000049296053,0.00011224229,0.00030029877,0.00047966398,0.01958474],"genre_scores_gemma":[0.9885854,0.00008483798,0.0077614044,0.000025604915,0.000019119527,0.000064816064,0.000062296625,0.00003623086,0.003360175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995433,0.0001370529,0.000015473513,0.00009850569,0.00013821769,0.00006747862],"domain_scores_gemma":[0.9995908,0.00019009606,0.00010686471,0.000042681542,0.000050440383,0.000019153906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044767908,0.00070446543,0.00055924937,0.00021129304,0.0003294745,0.0008737273,0.0008763115,0.000767823,0.0030872372],"category_scores_gemma":[0.0010008123,0.0003468187,0.00050184736,0.00029760555,0.00070327276,0.0017391895,0.00043552654,0.0008690668,0.00030288214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004313668,0.000025842039,0.0003309548,0.000016287493,0.000008544699,0.00006612635,0.000033305983,0.98312205,0.0015805671,0.012339404,0.00022357308,0.002210267],"study_design_scores_gemma":[0.000005826375,0.000013372455,0.00008565185,7.124984e-7,0.0000022312988,0.0000050344993,0.000006075314,0.9983948,0.000120836165,0.0012057722,0.00015772849,0.0000019198383],"about_ca_topic_score_codex":0.00897899,"about_ca_topic_score_gemma":0.0067216167,"teacher_disagreement_score":0.00897899,"about_ca_system_score_codex":0.0011243386,"about_ca_system_score_gemma":0.00071449426,"threshold_uncertainty_score":0.017853439},"labels":[],"label_agreement":null},{"id":"W1636262780","doi":"10.2172/1013938","title":"Using Smart Grids to Enhance Use of Energy-Efficiency and Renewable-Energy Technologies","year":2011,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Electricity; Office of Policy and International Affairs; Natural Resources Canada; U.S. Department of Energy","keywords":"Flexibility (engineering); Smart grid; Environmental economics; Sustainability; Electricity; Renewable energy; Service (business); Efficient energy use; Business; Reliability (semiconductor); Computer science; Risk analysis (engineering); Engineering; Marketing; Economics","score_opus":0.05104618795430483,"score_gpt":0.2569360509896626,"score_spread":0.20588986303535778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1636262780","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06145222,0.0034216377,0.03422374,0.0085293595,0.0004388388,0.0006482339,0.001981416,0.00076757604,0.88853693],"genre_scores_gemma":[0.5373376,0.035290997,0.086011514,0.0017003383,0.00030501335,0.0007342246,0.005176667,0.00024459802,0.33319902],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992317,0.00018553747,0.000027187727,0.000039483508,0.00043751448,0.00007862634],"domain_scores_gemma":[0.9996183,0.0001241717,0.000044349155,0.000068083835,0.00012028936,0.0000248632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081581244,0.00048276508,0.000117521704,0.00062387896,0.00045225097,0.001031221,0.0003960102,0.00048686782,0.0063083954],"category_scores_gemma":[0.00075110485,0.00013403667,0.00018560071,0.00091311464,0.00030200847,0.0014724924,0.00078698166,0.00046165648,0.0014060403],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001764229,0.0007669105,0.012059461,0.000653077,0.000045095974,0.00043393092,0.0006336087,0.01388987,0.022587601,0.09060349,0.10748602,0.75066453],"study_design_scores_gemma":[0.00006138824,0.0003392611,0.013758749,0.00017718998,0.000042332016,0.0004508655,0.00064296444,0.0061647934,0.040454138,0.012337432,0.92554104,0.00002981709],"about_ca_topic_score_codex":0.0059863254,"about_ca_topic_score_gemma":0.017557124,"teacher_disagreement_score":0.0063083954,"about_ca_system_score_codex":0.0006799938,"about_ca_system_score_gemma":0.0020749033,"threshold_uncertainty_score":0.02110374},"labels":[],"label_agreement":null},{"id":"W1644971860","doi":"10.1109/nafips-wconsc.2015.7284144","title":"Disaggregating household loads via semi-supervised multi-label classification","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Metering mode; Computer science; Electricity; Maximization; Supervised learning; Artificial intelligence; Machine learning; Energy (signal processing); Consumption (sociology); Utility maximization; Energy consumption; Engineering; Statistics; Mathematical optimization; Mathematics; Artificial neural network","score_opus":0.09508141425538677,"score_gpt":0.246721049684853,"score_spread":0.15163963542946624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1644971860","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15944928,0.00025684072,0.8316432,0.00022504611,0.00009120999,0.00018103015,0.0016293632,0.004073546,0.0024504417],"genre_scores_gemma":[0.79429334,0.000089088804,0.19613783,0.0001423172,0.00011201115,0.00022434483,0.005946653,0.00015213204,0.0029023534],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998946,0.00032072622,0.000072606475,0.0003673366,0.00020286253,0.00009041737],"domain_scores_gemma":[0.9983071,0.00046162453,0.0002960787,0.0004335013,0.00044181067,0.0000599425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089548505,0.0010319926,0.0010284891,0.001021328,0.00037530868,0.0006806915,0.0012589901,0.00062098994,0.0009658737],"category_scores_gemma":[0.0024544343,0.00028594016,0.00072601106,0.0009791618,0.0003554432,0.0012548299,0.00097254943,0.0008697747,0.0009949878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074492185,0.00118236,0.021508284,0.00035724396,0.0002691057,0.00029961218,0.00053222745,0.1861288,0.028576668,0.0020353964,0.013568669,0.74479663],"study_design_scores_gemma":[0.000014559202,0.00005847227,0.003950424,0.000009802282,0.000017439797,0.000042375494,0.000078483245,0.9860345,0.006076476,0.0024105487,0.0012915393,0.000015176542],"about_ca_topic_score_codex":0.0017647732,"about_ca_topic_score_gemma":0.004662345,"teacher_disagreement_score":0.0017647732,"about_ca_system_score_codex":0.0003380218,"about_ca_system_score_gemma":0.0004997627,"threshold_uncertainty_score":0.0047358274},"labels":[],"label_agreement":null},{"id":"W1644987935","doi":"10.1109/tii.2015.2475215","title":"Optimal Investment for Retail Company in Electricity Market","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"China Postdoctoral Science Foundation; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Electricity market; Electricity; Lagrange multiplier; Investment (military); Economics; Microeconomics; Return on investment; Mathematical optimization; Profit (economics); Mathematics; Engineering","score_opus":0.07001120426015113,"score_gpt":0.238175259953544,"score_spread":0.16816405569339288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1644987935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1981754,0.001501326,0.7716187,0.0016953218,0.00009072417,0.00024548007,0.00020102294,0.0002071311,0.026264895],"genre_scores_gemma":[0.96391255,0.00042674117,0.030342698,0.00009360252,0.000026074562,0.0000939981,0.00007499114,0.000044072658,0.0049852123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928457,0.0002878846,0.000027563918,0.0001467191,0.00008496862,0.00016840048],"domain_scores_gemma":[0.9991235,0.0005610275,0.00010189672,0.000029853169,0.00010165649,0.000081965845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012891324,0.0009778137,0.0016008697,0.0005849325,0.00047789278,0.0022100946,0.0009974426,0.0019292515,0.004604333],"category_scores_gemma":[0.0029626514,0.00082704576,0.00070550275,0.0006659139,0.0009186351,0.0025144517,0.001052911,0.0013735873,0.00026968066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012873542,0.000083373874,0.0007519749,0.00013370265,0.000035577123,0.00017833558,0.000052574967,0.9573031,0.0012506254,0.028578376,0.0012596927,0.01024395],"study_design_scores_gemma":[0.000017124641,0.000033386266,0.00012267566,0.000010239486,0.000012448678,0.00002204197,0.000029904177,0.9924097,0.00023501413,0.0068499213,0.0002501712,0.0000074139116],"about_ca_topic_score_codex":0.0051583066,"about_ca_topic_score_gemma":0.0047794916,"teacher_disagreement_score":0.0051583066,"about_ca_system_score_codex":0.002051136,"about_ca_system_score_gemma":0.0018974032,"threshold_uncertainty_score":0.015403032},"labels":[],"label_agreement":null},{"id":"W1674813195","doi":"10.1109/mpe.2015.2416112","title":"Distribution Pricing: Are We Ready for the Smart Grid?","year":2015,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council","keywords":"Incentive; Smart grid; Quarter (Canadian coin); Renewable energy; Electricity; Distribution (mathematics); Grid; Environmental economics; Electric power distribution; Distributed generation; Operations research; Business; Computer science; Transport engineering; Engineering; Economics; Electrical engineering; Microeconomics; Mathematics; Geography; Voltage","score_opus":0.029403232784817865,"score_gpt":0.23184221139568315,"score_spread":0.2024389786108653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1674813195","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002408162,0.014491857,0.007180584,0.8918869,0.011031612,0.000017184704,0.00035250778,0.0002880512,0.072343275],"genre_scores_gemma":[0.37044495,0.123128235,0.014905036,0.3061925,0.045994736,0.00013091139,0.0015414801,0.0009188364,0.13674337],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99749255,0.0006730949,0.000060001472,0.0002747111,0.0011662485,0.0003332981],"domain_scores_gemma":[0.99555427,0.0011533314,0.00029717048,0.00035357935,0.0016605803,0.0009810587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026582314,0.0005473246,0.0006437687,0.0006425854,0.0020255868,0.013094938,0.0013214672,0.005965772,0.035444263],"category_scores_gemma":[0.014461261,0.00031220657,0.00039470673,0.0021744333,0.004148144,0.027201502,0.0016462784,0.008786905,0.011981159],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035395162,0.00004937752,0.001097607,0.00014867651,0.000014882086,0.00006432388,0.00019052776,0.00062946224,0.0001570839,0.34810495,0.5209997,0.12850803],"study_design_scores_gemma":[0.000010564774,0.000016585682,0.0013203558,0.00030414396,0.000008782947,0.00011100869,0.0009344661,0.0010973429,0.00016073411,0.2275305,0.7684738,0.000031570173],"about_ca_topic_score_codex":0.006084108,"about_ca_topic_score_gemma":0.006344402,"teacher_disagreement_score":0.035444263,"about_ca_system_score_codex":0.004022952,"about_ca_system_score_gemma":0.0035375669,"threshold_uncertainty_score":0.11857289},"labels":[],"label_agreement":null},{"id":"W1683843353","doi":"10.1007/bfb0043278","title":"On-line identification of electric load models for load management","year":2006,"lang":"en","type":"book-chapter","venue":"Lecture notes in control and information sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Identification (biology); Line (geometry); Computer science; Mathematics; Biology; Ecology","score_opus":0.010950761206053232,"score_gpt":0.21381976992385032,"score_spread":0.2028690087177971,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1683843353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015301638,0.0001236124,0.971292,0.0000968673,0.00006280372,0.000061015187,0.00017970323,0.0026766115,0.010205782],"genre_scores_gemma":[0.8335784,0.00027395602,0.14461502,0.00013690688,0.00006340307,0.0001779016,0.00087021076,0.00050521985,0.019779008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977297,0.00007893075,0.000012456887,0.000039596925,0.00006908587,0.00002684152],"domain_scores_gemma":[0.999607,0.00013712792,0.0000381789,0.00009786156,0.00010944036,0.000010524521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028960063,0.0008857293,0.0006964855,0.00038873832,0.000445578,0.0010321209,0.0008002052,0.00080381165,0.008759997],"category_scores_gemma":[0.0010595169,0.00045785922,0.0004492602,0.00034474258,0.00020030892,0.0013182114,0.0005736311,0.0010370866,0.0034791764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027592317,0.00029250485,0.0010237824,0.00021645616,0.00007282764,0.00009533871,0.00015017865,0.7114576,0.023536425,0.0049511716,0.007192638,0.2507351],"study_design_scores_gemma":[0.0000095932155,0.00003366927,0.0002706913,0.000009483793,0.000009373277,0.000029739107,0.000014668139,0.9908189,0.0042874743,0.0020410288,0.0024689033,0.00000645156],"about_ca_topic_score_codex":0.0037206337,"about_ca_topic_score_gemma":0.007572868,"teacher_disagreement_score":0.008759997,"about_ca_system_score_codex":0.0003777605,"about_ca_system_score_gemma":0.0004116891,"threshold_uncertainty_score":0.02930516},"labels":[],"label_agreement":null},{"id":"W1756658042","doi":"10.22215/timreview/925","title":"Using Entrepreneurial Marketing to Foster Reseller Adoption of Smart Micro-Grid Technology","year":2015,"lang":"en","type":"article","venue":"Technology Innovation Management Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Renewable energy; Business; Environmental economics; Electricity; Grid; Industrial organization; Marketing; Economics; Electrical engineering; Engineering","score_opus":0.04371933660691164,"score_gpt":0.2804779758387261,"score_spread":0.23675863923181445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1756658042","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5135027,0.08872183,0.016004922,0.023587704,0.0020534974,0.00071424805,0.00006628255,0.0004231021,0.3549257],"genre_scores_gemma":[0.9139725,0.056096558,0.008604788,0.0023399384,0.000720868,0.00019916345,0.000047377158,0.00003793268,0.017980954],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99939466,0.00027229075,0.000016385817,0.000038600112,0.00017066272,0.00010744324],"domain_scores_gemma":[0.9979942,0.001278133,0.00029709024,0.00006620702,0.00018284879,0.00018156623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017087945,0.00022637371,0.00014662716,0.000648241,0.00054136285,0.0012680449,0.00037089485,0.00058520405,0.004666152],"category_scores_gemma":[0.00280808,0.000077652425,0.00026676437,0.0005613998,0.0004348499,0.0013843015,0.00069844,0.00071335706,0.0004707131],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017762205,0.0012422677,0.0044574016,0.0015073833,0.000053354444,0.0003433621,0.00095017755,0.0005861402,0.0031858666,0.035507422,0.013683333,0.93830574],"study_design_scores_gemma":[0.00064526807,0.0032187786,0.0582198,0.004218042,0.00032108932,0.0014519162,0.0055735824,0.007721769,0.04011513,0.040296443,0.83812106,0.0000971606],"about_ca_topic_score_codex":0.00052468583,"about_ca_topic_score_gemma":0.001451596,"teacher_disagreement_score":0.004666152,"about_ca_system_score_codex":0.0006175796,"about_ca_system_score_gemma":0.00095190876,"threshold_uncertainty_score":0.015609801},"labels":[],"label_agreement":null},{"id":"W1820091595","doi":"10.1002/wene.151","title":"Research with disaggregated electricity end‐use data in households: review and recommendations","year":2014,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Electricity; Context (archaeology); Sustainability; Work (physics); Environmental economics; Resource (disambiguation); Computer science; Risk analysis (engineering); Data science; Business; Engineering; Economics; Geography","score_opus":0.053936706726551084,"score_gpt":0.29149484541628645,"score_spread":0.23755813868973535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1820091595","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013419021,0.9960121,0.00026534367,0.0027152745,0.00031645765,0.000051551036,0.00020034863,0.0000098387445,0.00029501854],"genre_scores_gemma":[0.0014146537,0.9960479,0.0009289065,0.0011300497,0.0001330096,0.00011184435,0.0001203992,0.000005057855,0.00010807304],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99362814,0.0021147472,0.0020505337,0.00066871673,0.0012691428,0.00026880737],"domain_scores_gemma":[0.9416107,0.042758457,0.005354478,0.0011997784,0.0084560765,0.00062058936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016989553,0.0012345591,0.004714385,0.009368702,0.0006353811,0.00390893,0.0032256395,0.0029367886,0.0068741706],"category_scores_gemma":[0.05116775,0.0011595418,0.0057924422,0.013529393,0.0015162916,0.0067404425,0.0020655242,0.003061344,0.0012813373],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001465495,0.000067619934,0.0017536376,0.3997699,0.002034976,0.00020434268,0.00096252374,0.00044524303,0.0002493861,0.004963139,0.035049815,0.55435294],"study_design_scores_gemma":[0.0000524418,0.00007098786,0.0048448015,0.63377666,0.0047298805,0.0003925034,0.0011142937,0.0001889089,0.00021176919,0.0044246167,0.35011318,0.00008003583],"about_ca_topic_score_codex":0.023560846,"about_ca_topic_score_gemma":0.05081803,"teacher_disagreement_score":0.023560846,"about_ca_system_score_codex":0.0037506358,"about_ca_system_score_gemma":0.017844759,"threshold_uncertainty_score":0.089850426},"labels":[],"label_agreement":null},{"id":"W1833819033","doi":"10.1007/s12667-016-0193-9","title":"Price and capacity competition in balancing markets with energy storage","year":2016,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Marginal cost; Microeconomics; Energy storage; Economics; Dynamic pricing; Time horizon; Competition (biology); Environmental economics; Peak demand; Electricity market; Electricity; Industrial organization; Power (physics)","score_opus":0.004502223546692922,"score_gpt":0.14664194011370588,"score_spread":0.14213971656701296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1833819033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7995409,0.002061895,0.07579724,0.009667521,0.0006088926,0.00010826227,0.0005876947,0.00018612674,0.11144156],"genre_scores_gemma":[0.9941697,0.00013554776,0.00062870793,0.00007945645,0.00007520677,0.000010048448,0.000033410823,0.000020166175,0.004847717],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987919,0.00054409396,0.000039227627,0.00014416518,0.00017815102,0.00030257844],"domain_scores_gemma":[0.9893072,0.008614184,0.0007449461,0.00019175529,0.0005555991,0.0005862512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038815455,0.0006059388,0.0015985233,0.0006240636,0.0011328765,0.00520707,0.0018861801,0.0026543655,0.021142118],"category_scores_gemma":[0.018306896,0.00090118614,0.0008438026,0.0007951546,0.0025848413,0.007909757,0.00135489,0.0024811046,0.00062496506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017144593,0.0003564996,0.0037300598,0.00021560957,0.000112616726,0.0007666018,0.00032716425,0.37111402,0.0020379084,0.5999111,0.008324294,0.011389808],"study_design_scores_gemma":[0.00022822346,0.00017232682,0.0023465399,0.000026714602,0.00006244032,0.00014883395,0.00046734835,0.6360219,0.00045824324,0.3583353,0.0016509418,0.00008115796],"about_ca_topic_score_codex":0.006186587,"about_ca_topic_score_gemma":0.009359886,"teacher_disagreement_score":0.021142118,"about_ca_system_score_codex":0.0025636372,"about_ca_system_score_gemma":0.0016386969,"threshold_uncertainty_score":0.07072747},"labels":[],"label_agreement":null},{"id":"W1839683","doi":"10.2172/989207","title":"Springboard Engineering's Smart Grid Controller for Non-Smart Household Electricity-Consuming Appliances (Final Technical Report)","year":2010,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Springboard (Canada)","funders":"","keywords":"Smart grid; Backup; Telecommunications; Electricity; Demand response; Grid; Peak demand; Computer science; Engineering; Electrical engineering; Operating system","score_opus":0.025749023725233706,"score_gpt":0.2390963908943621,"score_spread":0.2133473671691284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1839683","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026420204,0.006280852,0.24893102,0.01141618,0.008182148,0.0029883094,0.004628971,0.022534786,0.66861755],"genre_scores_gemma":[0.045358926,0.002254891,0.039530937,0.0012221738,0.00048644742,0.0005236178,0.0034922871,0.00105657,0.9060741],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989465,0.000091206995,0.00003618758,0.000089959925,0.0007386622,0.00009747844],"domain_scores_gemma":[0.99935347,0.00007425572,0.000026438236,0.00006549782,0.00040140422,0.0000790102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013212237,0.0010399771,0.00036162505,0.00070871005,0.0006829512,0.0013206758,0.0007288713,0.0014370271,0.05427224],"category_scores_gemma":[0.0008250878,0.00036605718,0.00028798444,0.00044189568,0.0003214914,0.0016935195,0.0006114857,0.0014586374,0.030199498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026787134,0.00035398663,0.0008253254,0.00014239692,0.000015826286,0.0002380486,0.00017384453,0.0021723823,0.021667607,0.008146445,0.6789114,0.28708482],"study_design_scores_gemma":[0.000084333704,0.0003010341,0.0010002595,0.00005027638,0.000010586551,0.00015530422,0.00008457033,0.0076610474,0.018085103,0.0014318692,0.9711141,0.000021559994],"about_ca_topic_score_codex":0.003450369,"about_ca_topic_score_gemma":0.006094728,"teacher_disagreement_score":0.05427224,"about_ca_system_score_codex":0.0006447841,"about_ca_system_score_gemma":0.0013936111,"threshold_uncertainty_score":0.18155873},"labels":[],"label_agreement":null},{"id":"W1843165013","doi":"10.1109/ichqp.2000.897020","title":"Quantifying PQ and reliability market opportunities from the customer's perspective","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Restructuring; Perspective (graphical); Electricity; Service provider; Electric power industry; Quality (philosophy); Marketing; Business; Customer satisfaction; Service (business); Service quality; Computer science; Power (physics); Telecommunications; Engineering; Finance; Electrical engineering","score_opus":0.05614325472037369,"score_gpt":0.2245371874149449,"score_spread":0.16839393269457123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1843165013","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8387116,0.0008477506,0.006693283,0.0013614974,0.000016336473,0.00008858026,0.00088868587,0.00004124998,0.15135111],"genre_scores_gemma":[0.9983689,0.000118017626,0.0004225515,0.000028037284,0.000012078596,0.000008506309,0.00007716465,0.000005336653,0.00095936534],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99878293,0.00042630985,0.000027278755,0.00009435295,0.00044564228,0.00022351486],"domain_scores_gemma":[0.99227613,0.004824184,0.0007359457,0.00018326721,0.001494451,0.00048599733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014647257,0.00019165887,0.00026169085,0.0017777957,0.00042371426,0.003258817,0.0004541289,0.000979144,0.012888832],"category_scores_gemma":[0.0065505914,0.00016974627,0.00027862005,0.0020648236,0.00063763594,0.004681289,0.00090035016,0.0007580814,0.0008183074],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016467975,0.00079271843,0.42606077,0.00044695742,0.00015155002,0.0023744446,0.0047237054,0.055916484,0.0075665247,0.29463074,0.013149558,0.19253984],"study_design_scores_gemma":[0.00012108386,0.0025106666,0.56706727,0.0001773802,0.00029448658,0.0027757862,0.034265373,0.21690583,0.005785889,0.12679926,0.043038778,0.00025816518],"about_ca_topic_score_codex":0.0034699584,"about_ca_topic_score_gemma":0.006365832,"teacher_disagreement_score":0.012888832,"about_ca_system_score_codex":0.0014281629,"about_ca_system_score_gemma":0.0004311952,"threshold_uncertainty_score":0.043117404},"labels":[],"label_agreement":null},{"id":"W1868796678","doi":"10.3968/j.est.1923847920130601.2627","title":"Analyses and Discussions of the Blackout in Indian Power Grid","year":2013,"lang":"en","type":"article","venue":"Energy science and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blackout; Grid; Power grid; Electric power system; Power (physics); Computer science; Control (management); China; Computer security; Engineering; Reliability engineering; Geography","score_opus":0.005218019636738169,"score_gpt":0.20770044312028257,"score_spread":0.2024824234835444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1868796678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7632591,0.004342139,0.0080582965,0.0053629815,0.00019264771,0.00004226149,0.00041542435,0.00022035747,0.21810664],"genre_scores_gemma":[0.99461585,0.0011438255,0.00035619846,0.00015283364,0.000027771695,0.000005334286,0.0000750134,0.00001590772,0.0036073285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99968207,0.000077454424,0.000016179254,0.000028796027,0.00009953819,0.00009599738],"domain_scores_gemma":[0.9992405,0.00030011692,0.00014716639,0.00004795944,0.00022846504,0.000035803136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005434533,0.00016748163,0.00012359524,0.0013733552,0.0011114638,0.0020209027,0.00042887797,0.00040536837,0.0017083341],"category_scores_gemma":[0.0011620035,0.00011921782,0.00028337797,0.0022395581,0.0009349483,0.0009311878,0.0005710048,0.00062783994,0.00009413206],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000532055,0.00013277536,0.11726909,0.000809017,0.00012644696,0.0077778557,0.028522853,0.06894557,0.009787352,0.56249005,0.034187306,0.1694197],"study_design_scores_gemma":[0.000020255615,0.00016196095,0.39749262,0.0005239893,0.00022281463,0.0018852601,0.062777616,0.10200333,0.014467865,0.12641661,0.29384068,0.00018694984],"about_ca_topic_score_codex":0.032866172,"about_ca_topic_score_gemma":0.028950458,"teacher_disagreement_score":0.032866172,"about_ca_system_score_codex":0.0021185533,"about_ca_system_score_gemma":0.00080584973,"threshold_uncertainty_score":0.06534976},"labels":[],"label_agreement":null},{"id":"W1947078470","doi":"10.1109/infocom.2015.7218654","title":"A truthful incentive mechanism for emergency demand response in colocation data centers","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Incentive; Computer science; Remuneration; Demand response; Backup; Server; Environmental economics; Load management; Cost reduction; Electricity; Computer security; Business; Database; Computer network; Microeconomics; Finance; Economics; Engineering","score_opus":0.050171771194554377,"score_gpt":0.2693416255813232,"score_spread":0.2191698543867688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1947078470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058983654,0.00034625526,0.930885,0.0011531906,0.00022764188,0.0003465341,0.00023149303,0.0006579207,0.007168274],"genre_scores_gemma":[0.91682965,0.00018881336,0.079274714,0.00021015476,0.00008252382,0.0001476366,0.00009254277,0.000050383584,0.0031236003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99702317,0.0013402184,0.0001682522,0.00052367017,0.0004930637,0.00045167562],"domain_scores_gemma":[0.9910964,0.0052850978,0.0010960317,0.0011108281,0.0007472085,0.0006644387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005375589,0.0008566297,0.0014538136,0.00070952397,0.0010173338,0.00227805,0.003458797,0.002236315,0.0059955707],"category_scores_gemma":[0.0150302,0.0006216914,0.0010050362,0.00089616067,0.0017759561,0.0038882867,0.002056567,0.0025854695,0.00066819106],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001944249,0.0008129731,0.0018618157,0.00059343595,0.0001517365,0.0009253418,0.0005485037,0.54616606,0.0138788,0.33263972,0.009304038,0.09117329],"study_design_scores_gemma":[0.00024352505,0.00023494512,0.00020399719,0.000030117462,0.000029365134,0.00024889313,0.00006818527,0.92053956,0.0015703894,0.074370794,0.0024161376,0.000044196866],"about_ca_topic_score_codex":0.0013173003,"about_ca_topic_score_gemma":0.0010865404,"teacher_disagreement_score":0.0059955707,"about_ca_system_score_codex":0.0016464266,"about_ca_system_score_gemma":0.0025312232,"threshold_uncertainty_score":0.02842921},"labels":[],"label_agreement":null},{"id":"W1963897199","doi":"10.1109/ias.2013.6682589","title":"Real-time testing of Newton-phaselet method for calculating the power factor of single phase loads","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Newton's method; Power factor; Convergence (economics); Power (physics); Control theory (sociology); AC power; Phase angle (astronomy); Iterative method; Computer science; Mathematics; Algorithm; Nonlinear system; Physics","score_opus":0.026875186945247896,"score_gpt":0.2776890541616262,"score_spread":0.25081386721637833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963897199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34396392,0.00021512638,0.64644057,0.00019302074,0.00013757941,0.00014807432,0.00013723974,0.0023384998,0.006425939],"genre_scores_gemma":[0.812117,0.00008365229,0.18573618,0.000020035119,0.000012003733,0.00008660484,0.00009358146,0.00013726216,0.0017137855],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991448,0.00020235717,0.000035497367,0.00009201953,0.0004922692,0.000033025997],"domain_scores_gemma":[0.99782217,0.0012256781,0.00013925244,0.00026141378,0.00050376507,0.00004771066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011980816,0.00040441708,0.00030761783,0.00048096382,0.00023296985,0.00047907134,0.0008017004,0.0005171167,0.00214008],"category_scores_gemma":[0.0038312515,0.00016778451,0.00013426335,0.00042651207,0.00039960316,0.00074976933,0.00030279005,0.00041177546,0.00035365229],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015899314,0.00048247722,0.0066013196,0.00072208914,0.00007072784,0.0005752756,0.0013097129,0.17612143,0.2862764,0.01035594,0.0033509885,0.5125436],"study_design_scores_gemma":[0.00007483367,0.00054777926,0.0024723744,0.000024282659,0.000012964393,0.00020331776,0.00010129322,0.8163036,0.17574793,0.0008606476,0.0036095274,0.000041398398],"about_ca_topic_score_codex":0.0010891769,"about_ca_topic_score_gemma":0.0008740503,"teacher_disagreement_score":0.00214008,"about_ca_system_score_codex":0.0003288281,"about_ca_system_score_gemma":0.0003525606,"threshold_uncertainty_score":0.0071592927},"labels":[],"label_agreement":null},{"id":"W1964589816","doi":"10.1109/sege.2013.6707909","title":"Cost optimization via rescheduling in smart grids &amp;#x2014; A linear programming approach","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Linear programming; Demand response; Smart grid; Mathematical optimization; Energy consumption; Task (project management); Power (physics); Consumption (sociology); Power consumption; Energy (signal processing); Function (biology); Grid; Order (exchange); Electricity; Engineering; Algorithm; Electrical engineering; Economics; Mathematics","score_opus":0.022232387837138587,"score_gpt":0.22102310360562763,"score_spread":0.19879071576848906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964589816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03147393,0.00048604835,0.9512411,0.0008336579,0.0000647197,0.00007558076,0.00020446273,0.00033573818,0.0152847795],"genre_scores_gemma":[0.82659465,0.00095946324,0.14280763,0.0002658678,0.000081726204,0.00044070175,0.00026283102,0.00025049318,0.028336661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937457,0.00033800292,0.000016312564,0.0000767068,0.00011146509,0.00008290732],"domain_scores_gemma":[0.9993406,0.0004884348,0.00005912635,0.00002313386,0.000064875385,0.000023803535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011170272,0.000946944,0.0011042478,0.00048656834,0.00041264982,0.0014897201,0.0009487094,0.0011085739,0.0040352214],"category_scores_gemma":[0.001803072,0.00071907334,0.0008546514,0.0009346923,0.00071296596,0.0013536658,0.00055087934,0.0011313796,0.0004165314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001074001,0.000016865915,0.000049593524,0.000016249021,0.0000062751697,0.000014704609,0.000009244958,0.9880108,0.000104620674,0.007662517,0.00033408878,0.0037642906],"study_design_scores_gemma":[0.0000028292384,0.0000063492043,0.000012906457,0.0000017018881,0.0000015278266,0.0000020135105,0.000003085356,0.9971034,0.00004280124,0.0026394618,0.00018256975,0.0000013959607],"about_ca_topic_score_codex":0.012728051,"about_ca_topic_score_gemma":0.009649798,"teacher_disagreement_score":0.012728051,"about_ca_system_score_codex":0.00204493,"about_ca_system_score_gemma":0.0018496554,"threshold_uncertainty_score":0.025307953},"labels":[],"label_agreement":null},{"id":"W1965497469","doi":"10.1016/j.enbuild.2014.10.022","title":"Economic feasibility of residential electricity storage systems in Ontario, Canada considering two policy scenarios","year":2014,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Subsidy; Electricity; Consumption (sociology); Commodity; Environmental economics; Peak demand; Economics; Business; Natural resource economics; Agricultural economics; Electricity market; Finance; Market economy; Engineering; Electrical engineering","score_opus":0.007041512435047582,"score_gpt":0.19334833990139993,"score_spread":0.18630682746635235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965497469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9171724,0.0008514084,0.0013843889,0.00470793,0.00005763239,0.0002566211,0.005910656,0.00007851606,0.06958046],"genre_scores_gemma":[0.99166894,0.00030212203,0.00044577435,0.00010232296,0.000007673564,0.000025531679,0.00053854194,0.000010944039,0.006898102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841213,0.00034986125,0.000052280997,0.00009399287,0.000320939,0.0007706897],"domain_scores_gemma":[0.9971342,0.0012521906,0.0001912024,0.00006544923,0.00088475953,0.00047219853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014440219,0.00062643894,0.0008458606,0.00097251654,0.0032837102,0.0051163617,0.0019140198,0.0021676426,0.0075823567],"category_scores_gemma":[0.004533131,0.0008350497,0.0011933009,0.0019696634,0.002005766,0.0017104491,0.0009775446,0.0015449242,0.00028442737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025900933,0.00034014767,0.02963382,0.00036537545,0.00020087056,0.0016258069,0.000534957,0.84333825,0.0016428439,0.09093727,0.01717494,0.011615634],"study_design_scores_gemma":[0.0009874305,0.00045578138,0.07982384,0.00021558057,0.000423124,0.0002540356,0.009191992,0.86552197,0.0021804448,0.017425913,0.023215104,0.00030470086],"about_ca_topic_score_codex":0.9873946,"about_ca_topic_score_gemma":0.9922569,"teacher_disagreement_score":0.077997856,"about_ca_system_score_codex":0.077997856,"about_ca_system_score_gemma":0.05080014,"threshold_uncertainty_score":0.56591666},"labels":[],"label_agreement":null},{"id":"W1965889921","doi":"10.1016/j.enbuild.2007.01.020","title":"Load duration curve: A tool for technico-economic analysis of energy solutions","year":2007,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Monte Carlo method; Duration (music); Power (physics); Relevance (law); Peak load; Population; Energy (signal processing); Computer science; Reliability engineering; Econometrics; Simulation; Statistics; Engineering; Mathematics; Automotive engineering","score_opus":0.007229024592210077,"score_gpt":0.20891562749550882,"score_spread":0.20168660290329873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965889921","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019067265,0.000466621,0.94316375,0.00034235712,0.00010917843,0.0001329966,0.0045211446,0.0034670653,0.028729508],"genre_scores_gemma":[0.6586392,0.0012314324,0.30602264,0.00019529444,0.00026716597,0.00069555204,0.0067563127,0.0031526112,0.02303982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991935,0.00021579138,0.00005109039,0.000077797806,0.00038731034,0.00007444163],"domain_scores_gemma":[0.9940013,0.0040498856,0.0003866186,0.0006021041,0.00074281124,0.00021711664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021618477,0.001048696,0.0010481077,0.0058655776,0.0007528953,0.0023024662,0.0014783948,0.0013076782,0.022029564],"category_scores_gemma":[0.012556213,0.00047881092,0.0011570284,0.004503837,0.0005627048,0.0034862412,0.0010570321,0.0014130339,0.0032311666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030082065,0.0001760767,0.005518479,0.00034913386,0.00011323183,0.00024109207,0.00029871817,0.5546486,0.002359712,0.24660967,0.022568433,0.16681604],"study_design_scores_gemma":[0.000022672626,0.000057000496,0.0018377558,0.000052294527,0.000030214333,0.00016895182,0.000094543815,0.90135586,0.0014479253,0.06766968,0.027221566,0.00004146479],"about_ca_topic_score_codex":0.006115708,"about_ca_topic_score_gemma":0.0036848285,"teacher_disagreement_score":0.022029564,"about_ca_system_score_codex":0.0015224708,"about_ca_system_score_gemma":0.0011866846,"threshold_uncertainty_score":0.073696196},"labels":[],"label_agreement":null},{"id":"W1968228751","doi":"10.1109/smartgridcomm.2013.6688012","title":"Tackling the photovoltaic integration challenge in the distribution network with deferrable load","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Photovoltaic system; Computer science; Scheduling (production processes); Electricity; Mathematical optimization; Voltage; Load profile; Software deployment; Energy storage; Demand response; Load shifting; Automotive engineering; Electrical engineering; Power (physics); Engineering; Mathematics","score_opus":0.008407539091545142,"score_gpt":0.17823588018608755,"score_spread":0.1698283410945424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968228751","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18778849,0.0006478932,0.8073654,0.0007518793,0.00006713674,0.000050991614,0.000084709245,0.00029713957,0.0029464213],"genre_scores_gemma":[0.968978,0.0002256409,0.029392453,0.00008199003,0.000045973513,0.000024678187,0.00004592969,0.000029885623,0.0011753987],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995023,0.0001647451,0.000014347352,0.000111816225,0.000090946094,0.000115933544],"domain_scores_gemma":[0.9990569,0.0005285372,0.0001820701,0.000048511407,0.00009803855,0.000085977175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011192268,0.0007563655,0.0010925834,0.00028561105,0.00073565735,0.00096731907,0.0011051544,0.0007856255,0.00093561393],"category_scores_gemma":[0.0021310467,0.00051858294,0.00047816665,0.0006469887,0.000531703,0.0012744009,0.0007458786,0.001067382,0.00014867225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036117955,0.000021813503,0.0005421423,0.00002058797,0.000012465972,0.000085442174,0.000027207914,0.9882218,0.0006726283,0.002733399,0.00032139284,0.0073050098],"study_design_scores_gemma":[0.0000076917295,0.000020905316,0.00015362319,0.0000013097673,0.000004561255,0.000020357926,0.000012631704,0.9973884,0.00019368556,0.0020051866,0.0001882823,0.0000032778316],"about_ca_topic_score_codex":0.010012876,"about_ca_topic_score_gemma":0.009422371,"teacher_disagreement_score":0.010012876,"about_ca_system_score_codex":0.0012149763,"about_ca_system_score_gemma":0.0011801994,"threshold_uncertainty_score":0.019909143},"labels":[],"label_agreement":null},{"id":"W1968448601","doi":"10.1109/epc.2007.4520362","title":"DSM Approach for Water Heater Control Strategy Utilizing Elman Neural Network","year":2007,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Artificial neural network; Controller (irrigation); Control (management); Representation (politics); Computer science; Block (permutation group theory); Power (physics); Peak demand; Power demand; Control engineering; Engineering; Artificial intelligence; Electrical engineering; Mathematics; Electricity; Power consumption","score_opus":0.01680571010265009,"score_gpt":0.21199103504469421,"score_spread":0.19518532494204413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968448601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021524873,0.00035387682,0.96978635,0.00015175123,0.000060893188,0.000044967655,0.000022558172,0.00031503465,0.007739737],"genre_scores_gemma":[0.915218,0.00021303899,0.076353595,0.00019795097,0.000052844673,0.00010974949,0.000058452402,0.000022130325,0.007774367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999828,0.000039478673,0.000010075172,0.000041251158,0.000057351852,0.000023789973],"domain_scores_gemma":[0.999899,0.000026182563,0.000013516694,0.000006147536,0.000049068294,0.0000060470516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002925196,0.0004762196,0.00037434231,0.00023119124,0.00024360049,0.00044308687,0.00073450746,0.0005204262,0.0016376785],"category_scores_gemma":[0.00028999627,0.00015036826,0.00025005845,0.00023128407,0.00024506365,0.00042056898,0.00026125633,0.00044272654,0.00022144658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012532066,0.0001372527,0.00048494458,0.00013975543,0.000047676353,0.00010814768,0.00007354333,0.8144358,0.010486933,0.010687897,0.0013763683,0.16189632],"study_design_scores_gemma":[0.000007743626,0.000032610653,0.00006373675,0.0000025460388,0.00000416731,0.000007346244,0.000004400684,0.9977368,0.0010096575,0.00070085016,0.00042728597,0.0000029031569],"about_ca_topic_score_codex":0.0046543367,"about_ca_topic_score_gemma":0.0053703976,"teacher_disagreement_score":0.0046543367,"about_ca_system_score_codex":0.00055902824,"about_ca_system_score_gemma":0.00048685272,"threshold_uncertainty_score":0.009254515},"labels":[],"label_agreement":null},{"id":"W1968558779","doi":"10.1109/bsc.2010.5473004","title":"Wireless Sensor Networks for domestic energy management in smart grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Energy management; Energy consumption; Home automation; Wireless; Computer science; Scheme (mathematics); Energy management system; Computer network; Telecommunications; Grid; Consumption (sociology); Embedded system; Computer security; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.004906909428514634,"score_gpt":0.19810240363859735,"score_spread":0.19319549421008272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968558779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012962066,0.06784838,0.7733899,0.010313343,0.004096176,0.00022480873,0.0002771729,0.0012825887,0.12960559],"genre_scores_gemma":[0.5489259,0.08889613,0.21452841,0.002739493,0.0031180833,0.00043451667,0.0010363595,0.00031794983,0.14000326],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968994,0.00013300897,0.0000137718,0.000041952437,0.00010155333,0.000019718409],"domain_scores_gemma":[0.9997397,0.00010531004,0.000026943573,0.00003986037,0.00007285797,0.000015373595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047251466,0.00043520244,0.00032841516,0.00024316444,0.00031245075,0.0009163678,0.0005332967,0.00086207857,0.0069544143],"category_scores_gemma":[0.00076396466,0.00014178023,0.00017262077,0.00082807755,0.00036171367,0.0015028594,0.0004959636,0.00085762155,0.0018786589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016043191,0.00010764296,0.0011784445,0.0007997591,0.00004303922,0.00045229917,0.0002000051,0.05054143,0.010143908,0.370599,0.074782774,0.49099123],"study_design_scores_gemma":[0.000046323254,0.00018510297,0.00096817396,0.00035830488,0.000044179284,0.0006491479,0.0002350982,0.2691824,0.0057579703,0.14424329,0.57828754,0.00004243643],"about_ca_topic_score_codex":0.00069344515,"about_ca_topic_score_gemma":0.0011841547,"teacher_disagreement_score":0.0069544143,"about_ca_system_score_codex":0.00042100062,"about_ca_system_score_gemma":0.00045558182,"threshold_uncertainty_score":0.023264766},"labels":[],"label_agreement":null},{"id":"W1968785194","doi":"10.1109/vetecf.2010.5594388","title":"TOU-Aware Energy Management and Wireless Sensor Networks for Reducing Peak Load in Smart Grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Environmental economics; Energy management; Computer science; Peak demand; Electricity; Energy consumption; Greenhouse gas; Demand response; Base station; Distributed generation; Load management; Mains electricity; Wireless sensor network; Telecommunications; Renewable energy; Computer network; Energy (signal processing); Electrical engineering; Engineering; Economics","score_opus":0.00492580261137507,"score_gpt":0.18398219767067409,"score_spread":0.17905639505929902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968785194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10270733,0.0046894155,0.870803,0.0010966021,0.0005260947,0.00013334754,0.00015070925,0.0016700848,0.018223422],"genre_scores_gemma":[0.96566176,0.0012969061,0.030036138,0.00020803242,0.000110804904,0.000044946766,0.000069804446,0.00003474237,0.0025368577],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998129,0.000043309134,0.0000102669155,0.000055523647,0.00005501244,0.00002292866],"domain_scores_gemma":[0.99990726,0.000027212905,0.000021530794,0.000011498847,0.000024562736,0.000007839828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015879572,0.00046046716,0.00036204536,0.00026289295,0.00030706488,0.00046920186,0.0006510758,0.00034419599,0.0009779629],"category_scores_gemma":[0.00031731633,0.00010500137,0.0002520485,0.00046108756,0.00026095434,0.0011251331,0.0005085827,0.000394775,0.00019607026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034054104,0.00044023368,0.0053166426,0.0004954103,0.00012266662,0.00055957003,0.00027438186,0.42474914,0.07538115,0.03978814,0.011382961,0.44114915],"study_design_scores_gemma":[0.000017524546,0.0001679643,0.001494765,0.000022782673,0.000035813442,0.00018552791,0.00011708546,0.9642539,0.0130986385,0.011536341,0.009047172,0.000022434444],"about_ca_topic_score_codex":0.0010646746,"about_ca_topic_score_gemma":0.0013847834,"teacher_disagreement_score":0.0010646746,"about_ca_system_score_codex":0.00029616317,"about_ca_system_score_gemma":0.00020739251,"threshold_uncertainty_score":0.0032716393},"labels":[],"label_agreement":null},{"id":"W1968803183","doi":"10.1109/icdret.2009.5454208","title":"A feasibility study of an on-grid solar home system in Bangladesh","year":2009,"lang":"en","type":"article","venue":"2009 1st International Conference on the Developements in Renewable Energy Technology (ICDRET)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Renewable energy; Electricity generation; Photovoltaic system; Fossil fuel; Grid parity; Electric power system; Environmental economics; Grid; Solar power; Economic shortage; Electricity; Distributed generation; Computer science; Engineering; Business; Power (physics); Electrical engineering; Economics; Waste management; Geography; Government (linguistics)","score_opus":0.02874777066832292,"score_gpt":0.25593327062442384,"score_spread":0.2271854999561009,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968803183","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98892796,0.000022829961,0.0030791233,0.00012504663,0.000010354956,0.00014519741,0.00022034219,0.00009379728,0.007375311],"genre_scores_gemma":[0.99833554,0.000017603155,0.0006671577,0.000007909954,0.0000013453904,0.00002329683,0.00007852242,0.0000049063124,0.00086379074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99965346,0.00017628085,0.000016752883,0.00003618526,0.000069056936,0.00004832062],"domain_scores_gemma":[0.9995401,0.00021882547,0.00002834299,0.000028935045,0.00012750302,0.000056341833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004107667,0.00045667513,0.0005587499,0.00030351954,0.0006948145,0.00068911194,0.00066675316,0.000898944,0.0054231742],"category_scores_gemma":[0.00067319884,0.00022460475,0.00040510064,0.00023437482,0.00040309422,0.0007534649,0.0004850081,0.00029887113,0.00045964489],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005267692,0.0015817791,0.0504579,0.0006835443,0.00023277791,0.008011913,0.0011481922,0.8179134,0.07486809,0.0050471695,0.003463593,0.031324025],"study_design_scores_gemma":[0.00077301613,0.0053935973,0.018980332,0.000026477608,0.00015641609,0.0005297593,0.0027661938,0.94496804,0.022486718,0.0010840739,0.002761476,0.000073917945],"about_ca_topic_score_codex":0.012370174,"about_ca_topic_score_gemma":0.0093461685,"teacher_disagreement_score":0.012370174,"about_ca_system_score_codex":0.0010516394,"about_ca_system_score_gemma":0.000543393,"threshold_uncertainty_score":0.024596334},"labels":[],"label_agreement":null},{"id":"W1969855100","doi":"10.1109/icdmw.2014.19","title":"Smart Saver: A Consumer-Oriented Web Service for Energy Disaggregation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Upload; Computer science; Service (business); Web service; Energy (signal processing); Energy consumption; Energy conservation; Event (particle physics); Database; World Wide Web; Engineering; Business; Electrical engineering; Marketing","score_opus":0.006022362194187629,"score_gpt":0.1814128778984754,"score_spread":0.17539051570428776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969855100","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022226846,0.0009973039,0.5189415,0.0011580574,0.00046492618,0.0011942165,0.007948778,0.39170888,0.055359427],"genre_scores_gemma":[0.55012405,0.0026155482,0.2528528,0.005308863,0.00075535214,0.0022323004,0.037752718,0.029481996,0.11887643],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993637,0.000081245824,0.000052410287,0.000069581765,0.00033626868,0.00009676801],"domain_scores_gemma":[0.99932754,0.0001174604,0.00006671376,0.0001598461,0.00018323107,0.00014523276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007862988,0.001017373,0.0010527385,0.0012171738,0.00052216457,0.0013002024,0.0014142771,0.0014076206,0.014843435],"category_scores_gemma":[0.0014309598,0.00044050193,0.0006646174,0.0014059687,0.00040082156,0.0018892877,0.002031108,0.0012745399,0.010968797],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025766338,0.0013315934,0.0054359427,0.0015024284,0.00031695102,0.0020872178,0.0009021081,0.01154393,0.05410276,0.045914676,0.48001963,0.39426607],"study_design_scores_gemma":[0.0006807962,0.00034984195,0.005751353,0.00017117345,0.00015739443,0.0018207259,0.00023678808,0.270784,0.042804193,0.02851873,0.648326,0.0003990808],"about_ca_topic_score_codex":0.002792958,"about_ca_topic_score_gemma":0.0022791212,"teacher_disagreement_score":0.014843435,"about_ca_system_score_codex":0.0004736168,"about_ca_system_score_gemma":0.0009774705,"threshold_uncertainty_score":0.049656212},"labels":[],"label_agreement":null},{"id":"W1970129562","doi":"10.1109/tsg.2014.2310395","title":"Residential Energy Management Using a Two-Horizon Algorithm","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Time horizon; Computation; Horizon; Smart grid; Computer science; Limiting; Electricity; Demand response; Energy management; Mathematical optimization; Electricity market; Term (time); Energy (signal processing); Algorithm; Operations research; Engineering; Mathematics","score_opus":0.009044242257478914,"score_gpt":0.20931722878083284,"score_spread":0.20027298652335393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970129562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015447151,0.00013928876,0.97964257,0.0001635537,0.000039204027,0.00007500742,0.00005491455,0.00047430748,0.003964008],"genre_scores_gemma":[0.6806266,0.00014657824,0.3145368,0.00010484419,0.000056170884,0.00020963511,0.00015168323,0.000059041944,0.004108782],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996184,0.000112760055,0.0000199875,0.000080073165,0.00009795848,0.00007075886],"domain_scores_gemma":[0.9996094,0.00019459693,0.00004693056,0.000029990708,0.000080486716,0.00003866368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007775438,0.0006546782,0.0011198294,0.00042268634,0.0005664239,0.0008420039,0.0010185073,0.0010392581,0.0033432532],"category_scores_gemma":[0.0012986511,0.00034774307,0.0003896009,0.0006313364,0.0003827747,0.00082379224,0.00079384976,0.00075184315,0.00035194456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007481775,0.00004366303,0.00019577373,0.000026634938,0.000013117048,0.000024904037,0.000023693445,0.9625994,0.0005789451,0.0030160423,0.00076339865,0.03263961],"study_design_scores_gemma":[0.0000079673955,0.000008792792,0.000019357478,8.0392516e-7,0.0000010802644,0.0000031119287,0.0000019136269,0.9992588,0.000076826684,0.0005079939,0.00011174187,0.0000015602712],"about_ca_topic_score_codex":0.01031469,"about_ca_topic_score_gemma":0.008507566,"teacher_disagreement_score":0.01031469,"about_ca_system_score_codex":0.0009246273,"about_ca_system_score_gemma":0.0016312031,"threshold_uncertainty_score":0.020509303},"labels":[],"label_agreement":null},{"id":"W1970370622","doi":"10.1109/tsg.2014.2317800","title":"Total Cost of Ownership and Risk Analysis of Collaborative Implementation Models for Integrated Fiber-Wireless Smart Grid Communications Infrastructures","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Computer science; Total cost of ownership; Telecommunications; Exploit; Grid; Renewable energy; Wireless; Computer network; Computer security; Engineering; Electrical engineering","score_opus":0.014668181076184117,"score_gpt":0.2535063982544238,"score_spread":0.23883821717823966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970370622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2843296,0.0013091321,0.6820798,0.0018613627,0.00007088936,0.0004246186,0.0005549599,0.00019257417,0.029177167],"genre_scores_gemma":[0.979118,0.00039118333,0.015083654,0.00006657013,0.000029769959,0.00023751607,0.00013001842,0.000053182157,0.0048902044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965263,0.0016837802,0.00012889883,0.00033050412,0.00063785183,0.00069272966],"domain_scores_gemma":[0.9815933,0.0137546845,0.002317205,0.0008151072,0.0010670045,0.00045254332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008294669,0.0016223869,0.0011861015,0.0015205526,0.00079877826,0.0029084908,0.002393215,0.002167267,0.0056651435],"category_scores_gemma":[0.020299697,0.000926783,0.0019578487,0.0009674057,0.0022336745,0.004304531,0.0024019135,0.0029579252,0.00020317886],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004712476,0.00004353393,0.0010953206,0.000029684983,0.000023579836,0.000068957874,0.00004965576,0.9328107,0.00019624611,0.062256265,0.000343947,0.003034989],"study_design_scores_gemma":[0.00000718567,0.000026608706,0.00028445217,0.000012828351,0.000016895981,0.000026958101,0.000039230614,0.98381525,0.00009216667,0.015452276,0.00021599361,0.000010172421],"about_ca_topic_score_codex":0.011108329,"about_ca_topic_score_gemma":0.004686504,"teacher_disagreement_score":0.011108329,"about_ca_system_score_codex":0.005217962,"about_ca_system_score_gemma":0.0023687682,"threshold_uncertainty_score":0.043866932},"labels":[],"label_agreement":null},{"id":"W1970958942","doi":"10.1049/joe.2014.0345","title":"Smart meter deployment optimisation and its analysis for appliance load monitoring","year":2015,"lang":"en","type":"article","venue":"The Journal of Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software deployment; Computer science; Smart meter; Real-time computing; Reliability (semiconductor); Ambiguity; Dependency (UML); Metre; Distributed computing; Embedded system; Smart grid; Reliability engineering; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.0319121520242632,"score_gpt":0.23114957988292562,"score_spread":0.1992374278586624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970958942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02925561,0.0011985644,0.9591284,0.00051251356,0.000046572062,0.00006818512,0.000062916515,0.00016241129,0.009564857],"genre_scores_gemma":[0.8751092,0.0016880857,0.11393698,0.00021807535,0.0001141709,0.00019533726,0.00016743699,0.00014936988,0.008421405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991653,0.000368247,0.00002525885,0.00011688488,0.00021166248,0.000112718946],"domain_scores_gemma":[0.99654084,0.00291443,0.00022559072,0.000073168005,0.00020868586,0.000037240632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015765197,0.0009342498,0.0014016952,0.0009162137,0.0002833674,0.0010288875,0.00067007967,0.0011697799,0.0031782642],"category_scores_gemma":[0.0066302596,0.0007895649,0.0009186065,0.0011329773,0.0008038948,0.0014595747,0.00073954614,0.0010925038,0.00022109933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002171181,0.000014794623,0.00019393298,0.000051259474,0.00001544006,0.00001760271,0.000020154428,0.98560274,0.00028368883,0.007421294,0.0003401527,0.0060172705],"study_design_scores_gemma":[0.0000024102999,0.000009122857,0.00010625776,0.0000039357783,0.0000034373709,0.000005872195,0.0000051546745,0.9972318,0.00008243807,0.0023383084,0.000209254,0.000001975515],"about_ca_topic_score_codex":0.0037972177,"about_ca_topic_score_gemma":0.0018249204,"teacher_disagreement_score":0.0037972177,"about_ca_system_score_codex":0.0010770843,"about_ca_system_score_gemma":0.0010151932,"threshold_uncertainty_score":0.010632396},"labels":[],"label_agreement":null},{"id":"W1971037610","doi":"10.1109/glocom.2011.6134484","title":"Dynamic Power Management of Distributed Internet Data Centers in Smart Grid Environment","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Smart grid; Electricity market; Electricity; Cloud computing; Computer science; Demand response; Electric power system; The Internet; Linear programming; Environmental economics; Power (physics); Economics; Engineering; Electrical engineering","score_opus":0.016462260101960256,"score_gpt":0.18569220683557347,"score_spread":0.16922994673361322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971037610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16412176,0.00018627703,0.8266878,0.0005808727,0.000038195783,0.00008057973,0.00008777172,0.00034647738,0.007870208],"genre_scores_gemma":[0.99032354,0.000058597885,0.0084465,0.000019451958,0.000011199206,0.000026220243,0.000021346668,0.000018877288,0.0010742341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997688,0.00008096304,0.000008573231,0.000058394566,0.000049806054,0.00003343683],"domain_scores_gemma":[0.99972576,0.00012459345,0.00005388971,0.000013766069,0.000057706096,0.000024331495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047188994,0.00041371974,0.0005563542,0.0002555504,0.0004422575,0.0008764618,0.0006281646,0.00045508574,0.0013923249],"category_scores_gemma":[0.0009630986,0.00021501479,0.00021236611,0.00032864694,0.00043066815,0.0010209768,0.0004635407,0.00039906963,0.00012842326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073827316,0.00004687615,0.0006225255,0.000027416274,0.0000152101575,0.00007298377,0.000040066858,0.96926826,0.0020121087,0.0077385497,0.00067820353,0.01940396],"study_design_scores_gemma":[0.0000055431856,0.0000120573995,0.00010780939,6.695224e-7,0.0000020051484,0.0000050887706,0.000008397568,0.99772376,0.00021183254,0.0017524787,0.00016869446,0.0000015656507],"about_ca_topic_score_codex":0.0032648272,"about_ca_topic_score_gemma":0.00326895,"teacher_disagreement_score":0.0032648272,"about_ca_system_score_codex":0.00084667624,"about_ca_system_score_gemma":0.00051547814,"threshold_uncertainty_score":0.0064916015},"labels":[],"label_agreement":null},{"id":"W1971252745","doi":"10.1109/med.2014.6961476","title":"Collective target tracking mean field control for electric space heaters","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Trajectory; SIGNAL (programming language); Field (mathematics); Tracking (education); Computer science; Control theory (sociology); Point (geometry); Mathematical optimization; Control (management); Mathematics; Physics; Geometry","score_opus":0.005482669683272374,"score_gpt":0.18587508769698527,"score_spread":0.1803924180137129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971252745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09533645,0.0004999038,0.8927773,0.0005715474,0.00013294046,0.000035280584,0.000036414815,0.00019227133,0.0104177985],"genre_scores_gemma":[0.98729473,0.000119511074,0.008244444,0.00005043747,0.00002630332,0.000042575128,0.000016520084,0.000014580242,0.004190855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979335,0.000069238726,0.000005991972,0.000049198847,0.000048365604,0.000033865443],"domain_scores_gemma":[0.9994313,0.00030919016,0.000117029565,0.000021451247,0.00008164894,0.000039374143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007749622,0.0005012495,0.0007147395,0.00030167637,0.00048549887,0.0008410404,0.00063897215,0.00069797324,0.0014016024],"category_scores_gemma":[0.0014728473,0.0002571525,0.00035407854,0.0003192045,0.0010393898,0.000599273,0.0009840511,0.0007202111,0.0001287693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006577445,0.000022533228,0.00024927495,0.000030577346,0.000017815157,0.000051710384,0.00004881197,0.9688785,0.0020419715,0.022043379,0.00047709674,0.006072507],"study_design_scores_gemma":[0.000005305573,0.000016672237,0.000042101048,0.0000011749208,0.000001518319,0.00000281428,0.000004563625,0.99655235,0.00009907046,0.0031414207,0.00013054685,0.0000025049994],"about_ca_topic_score_codex":0.004675738,"about_ca_topic_score_gemma":0.0024988735,"teacher_disagreement_score":0.004675738,"about_ca_system_score_codex":0.0009249948,"about_ca_system_score_gemma":0.00052143,"threshold_uncertainty_score":0.009297073},"labels":[],"label_agreement":null},{"id":"W1972254270","doi":"10.1109/ispa.2012.137","title":"Using Low-power Embedded Microcontrollers as Web Servers","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Server; Operating system; Server farm; Microcontroller; Computer science; Web server; Power consumption; Embedded system; File server; Application server; Power (physics); Controller (irrigation); Computer network; Client–server model; The Internet","score_opus":0.011725923573809032,"score_gpt":0.22076014828467194,"score_spread":0.20903422471086291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972254270","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8784435,0.00082310644,0.10377477,0.0001431121,0.00014553196,0.0002708145,0.00015965902,0.0033937104,0.012845858],"genre_scores_gemma":[0.95570564,0.00030400135,0.03825281,0.00005838924,0.00002720671,0.000069612186,0.00016185471,0.00013378375,0.0052866247],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995172,0.00010944013,0.000030936142,0.00008840851,0.00019356694,0.000060323877],"domain_scores_gemma":[0.99916077,0.0002642428,0.00009198327,0.00018538705,0.00024608255,0.00005159804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030106463,0.0006456447,0.0003715754,0.00041495624,0.00021427027,0.0008546452,0.001250035,0.00030626528,0.003179712],"category_scores_gemma":[0.0015633992,0.00026611306,0.00013949022,0.00053993106,0.00025948585,0.0013222886,0.00048443468,0.00043447228,0.0010723502],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015426241,0.0011185011,0.02262225,0.00089469494,0.00019610375,0.00081778155,0.00027625842,0.0541149,0.6305096,0.004204832,0.0031767054,0.2805257],"study_design_scores_gemma":[0.00028785988,0.0025458783,0.027378198,0.000105331674,0.00029048524,0.0007867337,0.00018510225,0.19546017,0.741707,0.002630057,0.02853537,0.00008786014],"about_ca_topic_score_codex":0.00080258324,"about_ca_topic_score_gemma":0.0009520851,"teacher_disagreement_score":0.003179712,"about_ca_system_score_codex":0.00028675675,"about_ca_system_score_gemma":0.00025364247,"threshold_uncertainty_score":0.010637164},"labels":[],"label_agreement":null},{"id":"W1972694349","doi":"10.1109/icc.2013.6655203","title":"Service-oriented architecture for smart building energy management","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Integer programming; Energy consumption; Linear programming; Smart grid; Service (business); Energy management; Service-oriented architecture; Architecture; Renewable energy; Heuristic; Electricity; Greenhouse gas; Distributed computing; Energy (signal processing); Web service; Engineering; World Wide Web; Business; Algorithm","score_opus":0.0047469414412085655,"score_gpt":0.1778752014106752,"score_spread":0.17312825996946662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972694349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062604384,0.0020487716,0.96775067,0.0009866284,0.00015607853,0.00016719187,0.000063932566,0.0009637216,0.021602593],"genre_scores_gemma":[0.29478022,0.0037336848,0.6821096,0.000398201,0.00013022254,0.00039549632,0.00039022378,0.0001723427,0.01789009],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994986,0.00018152857,0.000034110548,0.00004939785,0.00017580781,0.00006049674],"domain_scores_gemma":[0.99982244,0.00006376767,0.00001662979,0.000025261535,0.000052603435,0.000019321165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006581044,0.0005857445,0.00048089348,0.00048158088,0.0006281287,0.0017604262,0.0009517591,0.0011631394,0.0046095634],"category_scores_gemma":[0.00065876805,0.00025783968,0.00054500566,0.0011428223,0.0007228684,0.0011608525,0.00082660216,0.0011388487,0.0010284357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009256486,0.00013228322,0.000364678,0.00029908927,0.00005342575,0.0002841936,0.00021858123,0.33037058,0.010353647,0.4446745,0.010024658,0.20313185],"study_design_scores_gemma":[0.000030749157,0.00007120644,0.00015332994,0.000064118045,0.000026516582,0.0001394201,0.00010802522,0.7675244,0.002529745,0.16609785,0.06323146,0.000023295326],"about_ca_topic_score_codex":0.0052271676,"about_ca_topic_score_gemma":0.0070286547,"teacher_disagreement_score":0.0052271676,"about_ca_system_score_codex":0.0013134405,"about_ca_system_score_gemma":0.0014176617,"threshold_uncertainty_score":0.015420496},"labels":[],"label_agreement":null},{"id":"W1975012710","doi":"10.1109/tsg.2014.2384202","title":"Optimizing Electric Vehicle Coordination Over a Heterogeneous Mesh Network in a Scaled-Down Smart Grid Testbed","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Testbed; Smart grid; Demand response; Network packet; Computer science; Grid; Electric vehicle; Computer network; Engineering; Electricity; Electrical engineering; Power (physics)","score_opus":0.013769264025843192,"score_gpt":0.21226034580752146,"score_spread":0.19849108178167826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975012710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9545127,0.000031781583,0.042566027,0.00008813245,0.000032459364,0.00013889771,0.00014776054,0.00047731222,0.0020050039],"genre_scores_gemma":[0.9886514,0.000015945358,0.010820221,0.0000092337295,0.0000017641377,0.000047277434,0.000088761684,0.000008597398,0.00035673115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997695,0.00008504869,0.000010770173,0.000054403186,0.000038976956,0.000041300744],"domain_scores_gemma":[0.9995395,0.00014139978,0.0000737758,0.00009394192,0.00006666601,0.000084845335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005554667,0.00036747076,0.0002682129,0.00022997941,0.00020419515,0.000333638,0.0006232805,0.00025268807,0.00086865487],"category_scores_gemma":[0.00071222265,0.00010540535,0.00015348276,0.00017643499,0.00035638356,0.00059246627,0.00039257377,0.00030287926,0.00009321276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096666033,0.00087171467,0.007201918,0.00010814148,0.000042026346,0.00041421552,0.00013097968,0.86340606,0.08963789,0.004704374,0.0011185025,0.031397514],"study_design_scores_gemma":[0.00010562028,0.0009792881,0.0020666565,0.0000034361622,0.00001482387,0.000043110336,0.000076673416,0.9651145,0.02981275,0.0009079328,0.00086470426,0.000010609653],"about_ca_topic_score_codex":0.0016048928,"about_ca_topic_score_gemma":0.0014085901,"teacher_disagreement_score":0.0016048928,"about_ca_system_score_codex":0.0006532145,"about_ca_system_score_gemma":0.00037411647,"threshold_uncertainty_score":0.004739344},"labels":[],"label_agreement":null},{"id":"W1977963540","doi":"10.1016/j.procs.2013.06.095","title":"Compressed Air Storage and Wind Energy for Time-of-day Electricity Markets","year":2013,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Compressed air energy storage; Electricity; Energy storage; Renewable energy; Pumped-storage hydroelectricity; Wind power; Tariff; Computer science; Environmental economics; Automotive engineering; Environmental science; Distributed generation; Power (physics); Electrical engineering; Business; Economics; Engineering","score_opus":0.004359207612814838,"score_gpt":0.17211801758820303,"score_spread":0.1677588099753882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977963540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6522882,0.008388831,0.20105812,0.0039485157,0.0009087251,0.00020173218,0.0013436101,0.0006386126,0.13122368],"genre_scores_gemma":[0.99095154,0.00080899574,0.0037916831,0.000050759885,0.000037600217,0.000017279901,0.00011592424,0.000019717862,0.004206457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999107,0.000026891803,0.0000040009463,0.000010186575,0.00003398444,0.0000141247865],"domain_scores_gemma":[0.9998385,0.00008056452,0.00002242564,0.000011504748,0.00003364831,0.000013452004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002195605,0.00029708535,0.00031281527,0.00022540882,0.0002775172,0.00080699666,0.00052921486,0.00052600785,0.005917121],"category_scores_gemma":[0.0006607626,0.00012369781,0.00031898334,0.00039288492,0.0003134108,0.0011301145,0.00026004706,0.00043436253,0.0002600379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030866114,0.00009653482,0.0025479398,0.00018922352,0.000045421268,0.00033809504,0.000050271243,0.8436396,0.005133883,0.10667176,0.004834225,0.036144402],"study_design_scores_gemma":[0.000047813297,0.00007882149,0.001168322,0.000025535179,0.000014513819,0.0000760042,0.000052483352,0.9625075,0.0013834307,0.027868642,0.006759699,0.000017256147],"about_ca_topic_score_codex":0.009518628,"about_ca_topic_score_gemma":0.012430608,"teacher_disagreement_score":0.009518628,"about_ca_system_score_codex":0.0006934188,"about_ca_system_score_gemma":0.0007012546,"threshold_uncertainty_score":0.019794762},"labels":[],"label_agreement":null},{"id":"W1980350681","doi":"10.2202/1553-779x.1279","title":"Harmonic Reducing ANN Controller for a SVC Compensating Unbalanced Fluctuating Loads","year":2006,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Control theory (sociology); Controller (irrigation); Fuzzy logic; Harmonics; Static VAR compensator; Computer science; Total harmonic distortion; AC power; Electric power system; Harmonic; Artificial neural network; Computation; Control engineering; Power (physics); Voltage; Engineering; Algorithm; Artificial intelligence; Control (management)","score_opus":0.006691977607030426,"score_gpt":0.22806236685347936,"score_spread":0.22137038924644895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980350681","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06958559,0.0004835051,0.9048409,0.00021581678,0.0003032336,0.00011420709,0.00008727923,0.002315671,0.022053825],"genre_scores_gemma":[0.93358326,0.0001583144,0.0565696,0.00011873779,0.000054647804,0.00009356224,0.00008534014,0.00003912481,0.00929728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987924,0.000013748055,0.00000815394,0.000029840043,0.000056235418,0.000012846104],"domain_scores_gemma":[0.99983597,0.000044645625,0.0000196756,0.000010379741,0.00008296846,0.0000063468356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022755722,0.00028662634,0.00023260167,0.00018343337,0.00032601124,0.00041981536,0.0004512278,0.00034761397,0.0023156814],"category_scores_gemma":[0.00040409318,0.00010901775,0.00017080014,0.00011822589,0.00014107855,0.00019198682,0.00013972638,0.0005076608,0.0004438402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033814157,0.00021722187,0.0014499831,0.00027010374,0.00010825174,0.00033247512,0.00012485762,0.51360065,0.08447509,0.0057984944,0.005364723,0.38791993],"study_design_scores_gemma":[0.000017141483,0.00009377868,0.0004527268,0.000010781612,0.000020752452,0.00004950322,0.000006269558,0.9868657,0.009722482,0.00034237452,0.002409972,0.000008567591],"about_ca_topic_score_codex":0.0036851503,"about_ca_topic_score_gemma":0.006153779,"teacher_disagreement_score":0.0036851503,"about_ca_system_score_codex":0.0003597922,"about_ca_system_score_gemma":0.00028543928,"threshold_uncertainty_score":0.0077466965},"labels":[],"label_agreement":null},{"id":"W1981174551","doi":"10.1109/isgteurope.2013.6695436","title":"Incentive based smart pricing scheme using scoring rule","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Incentive; Payment; Dynamic pricing; Electricity; Scheduling (production processes); Schedule; Scheme (mathematics); Incentive compatibility; Operations research; Mathematical optimization; Microeconomics; Economics; Engineering","score_opus":0.012442106856690666,"score_gpt":0.19230229276833719,"score_spread":0.17986018591164651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981174551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03644649,0.0001070392,0.95412254,0.0003969134,0.00012684458,0.0003679915,0.0001384889,0.0007501011,0.0075436058],"genre_scores_gemma":[0.82040465,0.00011510327,0.17257649,0.00017502345,0.00011430734,0.00023300467,0.00022126093,0.00006290422,0.0060972464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9929837,0.0025247054,0.000664702,0.0011003491,0.0021121667,0.0006144947],"domain_scores_gemma":[0.99439114,0.0018579043,0.00057661545,0.0010897169,0.0016176996,0.0004669864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005120201,0.00077434804,0.0015084515,0.0010115206,0.0010447133,0.0022900007,0.0035095168,0.0013923204,0.0045336173],"category_scores_gemma":[0.01243985,0.0003656885,0.0007126507,0.0015259759,0.0011192855,0.0038235898,0.0017391938,0.0018549821,0.001175369],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004796514,0.00076205155,0.005413016,0.0001648173,0.00014787463,0.00063427,0.00038813846,0.40042785,0.008857042,0.23404376,0.0101057,0.33857578],"study_design_scores_gemma":[0.000038196005,0.00007400366,0.00034541328,0.0000075686285,0.00001560854,0.000118784126,0.000023592456,0.96278036,0.0012303869,0.033489652,0.0018450867,0.0000312846],"about_ca_topic_score_codex":0.0025594498,"about_ca_topic_score_gemma":0.0021022533,"teacher_disagreement_score":0.005120201,"about_ca_system_score_codex":0.0012140955,"about_ca_system_score_gemma":0.0017867065,"threshold_uncertainty_score":0.027078569},"labels":[],"label_agreement":null},{"id":"W1981657074","doi":"10.1109/isgt.2010.5434752","title":"Optimal and autonomous incentive-based energy consumption scheduling algorithm for smart grid","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":509,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Software deployment; Energy consumption; Scheduling (production processes); Grid; Demand response; Schedule; Distributed computing; Distributed generation; Distributed algorithm; Incentive; Energy management system; Electricity; Energy management; Real-time computing; Energy (signal processing); Mathematical optimization; Engineering; Renewable energy; Electrical engineering; Operating system","score_opus":0.008631413739550758,"score_gpt":0.2078240666044262,"score_spread":0.19919265286487545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981657074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045010302,0.00012447764,0.9507224,0.0003077113,0.000060615937,0.00009125714,0.000042345404,0.00038439548,0.003256472],"genre_scores_gemma":[0.80885386,0.00008291105,0.18813942,0.000089928486,0.00003648273,0.00015353327,0.00007847249,0.000042017917,0.002523405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994764,0.00016273661,0.000024734192,0.000132094,0.0001053722,0.000098717835],"domain_scores_gemma":[0.9991722,0.00043713188,0.00012984753,0.000066406596,0.000117288124,0.00007714151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00097105047,0.0005525274,0.00101274,0.00036660844,0.00050260616,0.00065964606,0.0011883095,0.0008609926,0.001521045],"category_scores_gemma":[0.0018245354,0.0003312041,0.0002600607,0.00055223965,0.00055582897,0.0009940142,0.0007450808,0.0006250657,0.00023275317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017517537,0.00015025427,0.00059224,0.00005144982,0.000025266603,0.000055469416,0.00007061051,0.9287636,0.0023078385,0.020049438,0.0015659049,0.046192717],"study_design_scores_gemma":[0.000025691803,0.000015160579,0.000049113438,0.0000011577106,0.0000020199168,0.0000066517146,0.0000051317397,0.99620146,0.00021518665,0.0032350621,0.00024124068,0.000002082971],"about_ca_topic_score_codex":0.0027307903,"about_ca_topic_score_gemma":0.0032152217,"teacher_disagreement_score":0.0027307903,"about_ca_system_score_codex":0.0010030656,"about_ca_system_score_gemma":0.0018530805,"threshold_uncertainty_score":0.0072778463},"labels":[],"label_agreement":null},{"id":"W1982969324","doi":"10.4236/ti.2013.43021","title":"Impacts of Smart Grid Concept on Energy Industry","year":2013,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"České Vysoké Učení Technické v Praze","keywords":"Smart grid; Environmental economics; Grid; Electricity; Renewable energy; Computer science; Boom; Sustainability; Work (physics); Electricity generation; Business; Industrial organization; Environmental science; Power (physics); Economics; Electrical engineering; Engineering; Mechanical engineering","score_opus":0.006502244830591835,"score_gpt":0.18558073158987298,"score_spread":0.17907848675928115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982969324","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053254955,0.07467938,0.12314945,0.053826906,0.004687072,0.00013812404,0.00042385276,0.00067553594,0.6891647],"genre_scores_gemma":[0.8572616,0.0586214,0.030785415,0.0056323027,0.0034120453,0.00014991168,0.00021847762,0.00014587084,0.043772943],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907696,0.00030096024,0.000032163345,0.00016307342,0.00034396775,0.00008286508],"domain_scores_gemma":[0.9995677,0.00018344735,0.00004452969,0.000056599954,0.000108566615,0.000039133774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047961806,0.000446366,0.00021295618,0.00060234097,0.0006167778,0.0023134602,0.0005277706,0.0016134053,0.005245687],"category_scores_gemma":[0.00086325494,0.00014237537,0.00039994216,0.0008146654,0.0018209794,0.0044111917,0.0014066852,0.0018358435,0.0009496042],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025888328,0.000026789809,0.0007271926,0.00021761762,0.000007685956,0.0002939765,0.00024268065,0.0034506815,0.0010964726,0.93261623,0.0070716906,0.054223042],"study_design_scores_gemma":[0.000013014657,0.00016338032,0.0015103712,0.00053490093,0.000020711659,0.0010305182,0.00093003805,0.008892424,0.0022768816,0.55776304,0.4268179,0.000046785415],"about_ca_topic_score_codex":0.00095550285,"about_ca_topic_score_gemma":0.00051847124,"teacher_disagreement_score":0.005245687,"about_ca_system_score_codex":0.0014717642,"about_ca_system_score_gemma":0.0007041647,"threshold_uncertainty_score":0.017548561},"labels":[],"label_agreement":null},{"id":"W1983567088","doi":"10.1109/ghtc.2011.9","title":"Simulation of Rural Electrification via Cellular-Enabled Micro-inverter","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electrification; Rural electrification; Electricity; Grid; Mobile phone; Inverter; Power grid; Environmental economics; Business; Telecommunications; Computer science; Power (physics); Electrical engineering; Engineering; Economics; Voltage; Geography","score_opus":0.012060572657662404,"score_gpt":0.17773161823895303,"score_spread":0.16567104558129062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983567088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9162216,0.00013889963,0.043324884,0.00052812515,0.00008291956,0.00006296888,0.0008100383,0.0003159002,0.03851463],"genre_scores_gemma":[0.99476707,0.000054550117,0.0023565104,0.000026430336,0.0000039298075,0.000025799125,0.00011023064,0.000012915966,0.0026426495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999448,0.000015013129,0.0000023638831,0.000008596775,0.000011277144,0.000017909428],"domain_scores_gemma":[0.9997296,0.0001664517,0.000021882657,0.000011731813,0.00004413224,0.000026186764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012280836,0.00028390583,0.00033082953,0.0002388419,0.0003064937,0.000506641,0.00058544363,0.00092811155,0.005453062],"category_scores_gemma":[0.0005376119,0.00017108668,0.0004060413,0.00035704707,0.00035560454,0.0003719697,0.0003977485,0.00042081843,0.00022628673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002775634,0.000015809252,0.0008953548,0.000010229711,0.0000049946475,0.000052187323,0.000018191062,0.9968817,0.0003833576,0.0007460454,0.00013999549,0.0008243724],"study_design_scores_gemma":[0.000008892035,0.000016977488,0.00021661022,0.00000156246,0.0000027037365,0.0000051335455,0.000024573177,0.99911577,0.00015435046,0.00023469959,0.00021686344,0.0000019200522],"about_ca_topic_score_codex":0.017404556,"about_ca_topic_score_gemma":0.0128572285,"teacher_disagreement_score":0.017404556,"about_ca_system_score_codex":0.00045605237,"about_ca_system_score_gemma":0.00041061811,"threshold_uncertainty_score":0.034606516},"labels":[],"label_agreement":null},{"id":"W1984560471","doi":"10.1109/tsg.2010.2055903","title":"Optimal Residential Load Control With Price Prediction in Real-Time Electricity Pricing Environments","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1829,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Payment; Electricity; Operations research; Mathematics; Engineering; World Wide Web; Electrical engineering","score_opus":0.00370563764348467,"score_gpt":0.17633241643836858,"score_spread":0.17262677879488392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984560471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08205861,0.00016820793,0.9103531,0.00044811022,0.00006476,0.00005050349,0.000063413514,0.0005726729,0.0062205964],"genre_scores_gemma":[0.9780026,0.00007026856,0.02003376,0.000048409733,0.00003510696,0.00003002454,0.00003470957,0.000032028023,0.001713128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920976,0.00024341108,0.000026836944,0.00018870457,0.00014823703,0.00018307359],"domain_scores_gemma":[0.9991903,0.000427671,0.00016115585,0.0000416025,0.00012274738,0.000056524434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00097605557,0.00080440624,0.0010927671,0.0003279277,0.00043301645,0.0012787739,0.0012201349,0.00092076923,0.0013605853],"category_scores_gemma":[0.002281976,0.00058626395,0.00043755939,0.00047931413,0.0009069104,0.0012234505,0.0009470775,0.00093362597,0.0002144068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050595856,0.00003457304,0.00015651243,0.000010037695,0.000008848169,0.000021687747,0.000018231034,0.9920655,0.00032753253,0.0021337469,0.000251634,0.0049212486],"study_design_scores_gemma":[0.0000042400234,0.0000073616047,0.000037962604,4.782019e-7,0.000001316027,0.0000015941584,0.000002965034,0.9991025,0.00006851723,0.00072776614,0.00004355594,0.0000017394433],"about_ca_topic_score_codex":0.015180334,"about_ca_topic_score_gemma":0.013575814,"teacher_disagreement_score":0.015180334,"about_ca_system_score_codex":0.0010873377,"about_ca_system_score_gemma":0.0014268768,"threshold_uncertainty_score":0.03018397},"labels":[],"label_agreement":null},{"id":"W1984757241","doi":"10.1109/smartgridcomm.2013.6688037","title":"Optimal energy management for cooperative microgrids with renewable energy resources","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Renewable energy; Computer science; Energy management; Demand response; Exploit; Microgrid; Mathematical optimization; Scheduling (production processes); Grid; Energy (signal processing); Distributed computing; Electricity; Engineering; Electrical engineering","score_opus":0.004316754681416663,"score_gpt":0.16540762844896548,"score_spread":0.16109087376754883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984757241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06824409,0.00034967848,0.9267512,0.00025281357,0.000036131783,0.000056128974,0.00006574369,0.000147175,0.004097062],"genre_scores_gemma":[0.9752137,0.00015761897,0.022885377,0.00003236765,0.000020145675,0.00007794717,0.000050562154,0.000025165531,0.0015370835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995509,0.00015841129,0.00001719882,0.0000993531,0.00009258353,0.00008155768],"domain_scores_gemma":[0.9994537,0.0002760543,0.000107069776,0.00004210463,0.000073296826,0.000047759968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010174604,0.0010083133,0.0009967948,0.00038862292,0.00044729328,0.0010902715,0.0010475258,0.0007396195,0.0011232349],"category_scores_gemma":[0.0018423558,0.00050626183,0.00060560944,0.0005620107,0.00070326,0.0011628878,0.001319707,0.0006867095,0.00014694125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014977906,0.000010825252,0.00010389701,0.000010688579,0.00001090249,0.000029927558,0.000015181686,0.99378633,0.00024133889,0.0031284115,0.00011224189,0.0025352763],"study_design_scores_gemma":[0.000006487035,0.000014481083,0.00004662899,0.0000012806075,0.0000036435636,0.0000044902204,0.000012261674,0.996691,0.00007551314,0.0030133517,0.00012873535,0.0000021526341],"about_ca_topic_score_codex":0.0059054904,"about_ca_topic_score_gemma":0.0056756423,"teacher_disagreement_score":0.0059054904,"about_ca_system_score_codex":0.00097145024,"about_ca_system_score_gemma":0.0011458129,"threshold_uncertainty_score":0.011742234},"labels":[],"label_agreement":null},{"id":"W1987253469","doi":"10.1109/ccece.2014.6900956","title":"A fuzzy logic system for demand-side load management in residential buildings","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; Demand response; Load management; Fuzzy logic; Computer science; Electricity; Load balancing (electrical power); Energy management; Wireless; Demand side; Load shifting; Energy (signal processing); Engineering; Electrical engineering; Telecommunications; Environmental economics; Grid","score_opus":0.008241475544440012,"score_gpt":0.20539730023243843,"score_spread":0.19715582468799842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987253469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040736496,0.00021495254,0.94636655,0.00010473542,0.000074267475,0.00016729813,0.00018500701,0.004052095,0.008098647],"genre_scores_gemma":[0.77770793,0.00017064897,0.21601455,0.00009709719,0.000029379325,0.00020244496,0.00022796495,0.000056233283,0.005493774],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997912,0.000033666267,0.000018616907,0.000055029766,0.00007933534,0.000022150902],"domain_scores_gemma":[0.9998677,0.00003492822,0.000015769769,0.00001493479,0.000057592228,0.000009178244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035960256,0.00038073273,0.00033828858,0.00038274884,0.0005286426,0.0007364359,0.00071372633,0.000470335,0.0037205403],"category_scores_gemma":[0.000520395,0.00018315794,0.00032838603,0.00028460097,0.00020695753,0.00045566738,0.0002695961,0.00040820887,0.0007992191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007493606,0.0005018888,0.0031053203,0.00042570508,0.00011046431,0.00064793456,0.0005033027,0.34849748,0.12696266,0.01845725,0.0065531535,0.4934855],"study_design_scores_gemma":[0.000053059586,0.00014134467,0.0006498523,0.000025229334,0.000038731287,0.00012209461,0.00004117894,0.97546685,0.015984377,0.0026118949,0.0048407465,0.000024660885],"about_ca_topic_score_codex":0.006255584,"about_ca_topic_score_gemma":0.0058691544,"teacher_disagreement_score":0.006255584,"about_ca_system_score_codex":0.0005766631,"about_ca_system_score_gemma":0.0006457581,"threshold_uncertainty_score":0.012446463},"labels":[],"label_agreement":null},{"id":"W1989657130","doi":"10.1109/epec.2011.6070188","title":"Application of PSO to optimize the operation of electric water heaters for reserve provision","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Environmental science; Computer science","score_opus":0.014932588211993074,"score_gpt":0.19994027698010772,"score_spread":0.18500768876811463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989657130","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.115325026,0.00043521114,0.8736125,0.00022241111,0.0000765086,0.00012251239,0.000039897684,0.0003000067,0.009865924],"genre_scores_gemma":[0.880912,0.00020918093,0.1168468,0.00002792968,0.000021295959,0.000095701536,0.000036572634,0.000023562543,0.0018269576],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990356,0.00003903039,0.000005331106,0.000014329614,0.000025821684,0.000011853276],"domain_scores_gemma":[0.9998456,0.000094751245,0.000019167705,0.000007720501,0.00002594573,0.000006756301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028690687,0.00050349033,0.00039633576,0.00022580226,0.00018285273,0.0003828857,0.00027605443,0.00045328462,0.0006788989],"category_scores_gemma":[0.00069352315,0.0002133124,0.0003333096,0.00021251987,0.00022951327,0.00021777148,0.00019977693,0.0003368645,0.00007933019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002532199,0.00002390511,0.00034421455,0.000032661825,0.000021050424,0.000040266368,0.000019995652,0.9814191,0.0017609613,0.0012506964,0.00022712722,0.014834679],"study_design_scores_gemma":[0.000006198083,0.000018937251,0.000109219094,0.0000013811234,0.0000033025153,0.0000050767503,0.0000039801384,0.9992199,0.00030703962,0.00017539762,0.00014823102,0.0000013714384],"about_ca_topic_score_codex":0.0034501264,"about_ca_topic_score_gemma":0.0024694132,"teacher_disagreement_score":0.0034501264,"about_ca_system_score_codex":0.00023809203,"about_ca_system_score_gemma":0.00038056,"threshold_uncertainty_score":0.0068600774},"labels":[],"label_agreement":null},{"id":"W1990499846","doi":"10.1109/tsg.2015.2418790","title":"Indirect Load Shaping for CHP Systems Through Real-Time Price Signals","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Lyapunov optimization; Computer science; Queueing theory; Queue; Smart grid; Mathematical optimization; Optimization problem; Electric power system; Distributed computing; Power (physics); Engineering; Lyapunov equation; Computer network","score_opus":0.04776442756873813,"score_gpt":0.24875410865703665,"score_spread":0.2009896810882985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990499846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048245125,0.00018211137,0.9472518,0.00023311398,0.00004083585,0.000080254154,0.000031564803,0.00054447335,0.0033905888],"genre_scores_gemma":[0.9742406,0.00007923298,0.024220051,0.00003294793,0.000019593144,0.000031254087,0.000021922197,0.00002087355,0.0013334581],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995123,0.00015147321,0.000023522787,0.00010460461,0.00011618075,0.00009196941],"domain_scores_gemma":[0.9989222,0.0006497163,0.00017404273,0.00009911748,0.00010586732,0.00004903331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078053406,0.00079794216,0.00066982914,0.00023525173,0.0003693364,0.0011756977,0.00092634157,0.00048282513,0.002538562],"category_scores_gemma":[0.0024980393,0.00028004913,0.00033990026,0.00041570078,0.0006907382,0.0010919903,0.00077439676,0.0009527372,0.00028475406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003029125,0.000129587,0.0015116339,0.00012676632,0.000035772355,0.00012478957,0.000116124815,0.8560704,0.010398606,0.022450585,0.0010047719,0.10772814],"study_design_scores_gemma":[0.000014496095,0.000051433617,0.00015270383,0.000002786522,0.000006228512,0.000015383845,0.000012800715,0.9948548,0.0016001301,0.0030610003,0.00022364278,0.0000045925995],"about_ca_topic_score_codex":0.0022233773,"about_ca_topic_score_gemma":0.0039692204,"teacher_disagreement_score":0.002538562,"about_ca_system_score_codex":0.00079817144,"about_ca_system_score_gemma":0.0011234725,"threshold_uncertainty_score":0.008492351},"labels":[],"label_agreement":null},{"id":"W1990847655","doi":"10.1109/ccece.2014.6901014","title":"Predictive algorithm for Volt/VAR optimization of distribution networks using Neural Networks","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; Simon Fraser University","funders":"","keywords":"Smart grid; Voltage reduction; Artificial neural network; Metering mode; Computer science; Genetic algorithm; Optimization problem; Model predictive control; Metrology; Reduction (mathematics); Volt; Voltage; Algorithm; Control (management); Engineering; Machine learning; Artificial intelligence; Electrical engineering; Mathematics","score_opus":0.006622732850591696,"score_gpt":0.1927688971000736,"score_spread":0.1861461642494819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990847655","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023357322,0.00039149844,0.9713936,0.00018308383,0.00003253456,0.00004391201,0.00004387634,0.00049189595,0.0040623397],"genre_scores_gemma":[0.8977113,0.00033207142,0.09743531,0.00009926924,0.000037309026,0.0002265847,0.000115972536,0.000060358623,0.003981867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999777,0.000068521855,0.00001192802,0.000046664074,0.00006449248,0.000031427822],"domain_scores_gemma":[0.99945515,0.00038893492,0.000046252928,0.00001699484,0.00008267933,0.000009971476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006435589,0.0007206186,0.00074356433,0.00046970398,0.00040932116,0.0007462196,0.0007040868,0.00083640945,0.0015297411],"category_scores_gemma":[0.0016583344,0.00042285703,0.0003587669,0.0006612278,0.00043391783,0.0006385761,0.0005077179,0.0011224893,0.00021713579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014075923,0.000008142099,0.000108549015,0.000010710532,0.0000061803225,0.000008754538,0.000009717191,0.98484355,0.00019366998,0.00081602676,0.00013817153,0.013842429],"study_design_scores_gemma":[0.0000016407939,0.000003015557,0.000017706974,0.000001087501,9.69691e-7,0.0000011710367,0.0000012340547,0.99950075,0.00006898576,0.00036332372,0.00003942847,6.590066e-7],"about_ca_topic_score_codex":0.014087941,"about_ca_topic_score_gemma":0.011316651,"teacher_disagreement_score":0.014087941,"about_ca_system_score_codex":0.0008217201,"about_ca_system_score_gemma":0.00083231495,"threshold_uncertainty_score":0.028011918},"labels":[],"label_agreement":null},{"id":"W1991008596","doi":"10.1109/tsg.2014.2374613","title":"A Framework for Volt-VAR Optimization in Distribution Systems","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":187,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Voltage reduction; Reduction (mathematics); Volt; Voltage; Capacitor; Control theory (sociology); AC power; Mathematical optimization; Voltage regulator; Integer programming; Demand response; Optimization problem; Linear programming; Engineering; Load management; Voltage regulation; Computer science; Mathematics; Electrical engineering; Electricity","score_opus":0.011355240703132636,"score_gpt":0.216007708051606,"score_spread":0.20465246734847337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991008596","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00068498787,0.00046745938,0.9940872,0.00016451409,0.00003942987,0.000016847205,0.00004993709,0.000047765003,0.0044419123],"genre_scores_gemma":[0.44212863,0.0057079513,0.5272286,0.00033235445,0.0005114613,0.00065525103,0.00039995392,0.000263129,0.022772595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995515,0.00021884384,0.0000138069745,0.000058209524,0.000113850205,0.000043885546],"domain_scores_gemma":[0.9997341,0.00015444479,0.00002894933,0.000018620174,0.000050275434,0.000013522806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090244407,0.0013649137,0.0008906828,0.00052357424,0.00045647728,0.0012060445,0.0012274302,0.00092259055,0.005496808],"category_scores_gemma":[0.0011892448,0.0005008462,0.0008328251,0.0009739937,0.0007127872,0.00088095333,0.000949081,0.0017607773,0.00077427237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067861342,0.000016626975,0.00008468132,0.000057872458,0.000019592933,0.00003944734,0.000023634355,0.77924806,0.00046999592,0.20578015,0.0015637631,0.01268937],"study_design_scores_gemma":[0.000004645086,0.000012146628,0.000035367906,0.000011523833,0.000003937829,0.000013413982,0.000008955277,0.93936884,0.00006796829,0.056482464,0.0039857924,0.0000048956535],"about_ca_topic_score_codex":0.005231169,"about_ca_topic_score_gemma":0.005883556,"teacher_disagreement_score":0.005496808,"about_ca_system_score_codex":0.0009384415,"about_ca_system_score_gemma":0.0011061729,"threshold_uncertainty_score":0.018388629},"labels":[],"label_agreement":null},{"id":"W1993328790","doi":"10.1109/tpwrs.2014.2388193","title":"Load Decomposition at Smart Meters Level Using Eigenloads Approach","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Metering mode; Computer science; Load balancing (electrical power); Real-time computing; Software deployment; Computation; Load management; Smart grid; Set (abstract data type); Electricity meter; Distributed computing; Electrical engineering; Engineering; Power (physics); Algorithm","score_opus":0.061942395581318935,"score_gpt":0.2483812222684498,"score_spread":0.18643882668713085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993328790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013162735,0.00009295933,0.98320043,0.0000825266,0.000037364367,0.000027472463,0.00013560272,0.0007205141,0.0025403975],"genre_scores_gemma":[0.3904613,0.0004787563,0.59043217,0.00014386172,0.00015946562,0.00020871486,0.0016218434,0.00078730914,0.01570662],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996674,0.00006684364,0.000014885078,0.000066759676,0.00012638015,0.000057721107],"domain_scores_gemma":[0.99975663,0.00005886773,0.000033522407,0.000049790346,0.000081043545,0.000020159812],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029415538,0.0011022646,0.00070287404,0.0009261793,0.00048406818,0.0011567208,0.00065003795,0.00060838694,0.008843087],"category_scores_gemma":[0.00083466707,0.00044516218,0.0011418266,0.00083733327,0.00044761784,0.0013420614,0.00095364527,0.00085902255,0.00311639],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004041482,0.00022671156,0.0026256149,0.00027491106,0.00014154482,0.00050586235,0.0004095729,0.38952625,0.057378095,0.043895066,0.011134759,0.49347755],"study_design_scores_gemma":[0.0000075244693,0.000035016954,0.00074061047,0.0000101234455,0.0000110093715,0.00007605782,0.000083593586,0.97753376,0.004313381,0.0132113425,0.0039578658,0.000019687215],"about_ca_topic_score_codex":0.0022975325,"about_ca_topic_score_gemma":0.0023159492,"teacher_disagreement_score":0.008843087,"about_ca_system_score_codex":0.00032082485,"about_ca_system_score_gemma":0.0005450794,"threshold_uncertainty_score":0.029583097},"labels":[],"label_agreement":null},{"id":"W1993901885","doi":"10.1109/pscc.2014.7038312","title":"Effect of price responsive demand on the operation of microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Microgrid; Price elasticity of demand; Demand response; Renewable energy; Peak demand; Elasticity (physics); Schedule; Load management; Electricity; Computer science; Energy storage; Scheduling (production processes); Mathematical optimization; Economics; Microeconomics; Engineering; Power (physics); Operations management; Electrical engineering; Mathematics","score_opus":0.002998659763456177,"score_gpt":0.1886178600285692,"score_spread":0.18561920026511303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993901885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92179537,0.00012190903,0.067109376,0.00029225106,0.000061788036,0.0000939191,0.000448257,0.00038313054,0.009694132],"genre_scores_gemma":[0.9978678,0.000025629095,0.0014976589,0.0000150160895,0.0000021728913,0.000012797407,0.00006436478,0.00002002194,0.00049454265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932706,0.0002776305,0.000031493684,0.000076753924,0.00018345357,0.00010369635],"domain_scores_gemma":[0.99813133,0.001239388,0.00018773484,0.00017653573,0.00021242957,0.000052603886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011408558,0.0006917831,0.0005184994,0.00026744278,0.00034429127,0.00089708116,0.000736445,0.0006698974,0.001760013],"category_scores_gemma":[0.0036336193,0.00043735007,0.00048882555,0.00031935365,0.00037564966,0.0011384716,0.00060077483,0.00090042606,0.0002220955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006348048,0.000020945543,0.00093753816,0.000017620649,0.000009618457,0.00006298894,0.000016083832,0.9954953,0.0011315951,0.00062101486,0.000085324464,0.0015385671],"study_design_scores_gemma":[0.000009740763,0.00006647531,0.0008786922,0.000002379476,0.000007843787,0.000026269654,0.000033989814,0.9964445,0.0017816891,0.0005201183,0.00021973737,0.000008494164],"about_ca_topic_score_codex":0.0064023007,"about_ca_topic_score_gemma":0.003348055,"teacher_disagreement_score":0.0064023007,"about_ca_system_score_codex":0.0008374849,"about_ca_system_score_gemma":0.0005519597,"threshold_uncertainty_score":0.012730122},"labels":[],"label_agreement":null},{"id":"W1996737203","doi":"10.1109/tsg.2014.2357346","title":"Autonomous Demand Response Using Stochastic Differential Games","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Qatar National Research Fund; McMaster University","keywords":"Demand response; News aggregator; Air conditioning; Computer science; Electricity; Nash equilibrium; Electricity market; Mathematical optimization; Renewable energy; Engineering; Mathematics; Electrical engineering","score_opus":0.011789215083668087,"score_gpt":0.2109104116866712,"score_spread":0.19912119660300312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996737203","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060117316,0.00021769664,0.9243563,0.0005788708,0.0000828322,0.00015024313,0.00024491234,0.00025876856,0.013993081],"genre_scores_gemma":[0.97380865,0.00016955023,0.020305162,0.00011454959,0.000030448587,0.00020725899,0.00009222665,0.000024425606,0.005247662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989794,0.00044218282,0.00003845935,0.00018496456,0.000181901,0.00017308714],"domain_scores_gemma":[0.9987948,0.0007661351,0.00017671459,0.00003984982,0.00011827161,0.00010423824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009636717,0.0011324454,0.0010787911,0.000368941,0.00044220645,0.0012400748,0.0010810065,0.00097544666,0.0025996221],"category_scores_gemma":[0.0023778952,0.00047192702,0.0007232943,0.00041218588,0.0011252788,0.00093593594,0.0011396522,0.0011735952,0.00024151054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063378866,0.00004402792,0.00041267026,0.00003742767,0.000030782878,0.00010320856,0.000058562116,0.94795173,0.00091943215,0.046492286,0.00054779026,0.0033387393],"study_design_scores_gemma":[0.00001531037,0.000013260703,0.000047036778,0.0000016161068,0.0000036707938,0.0000065513473,0.00000708587,0.99179864,0.00006900434,0.007782941,0.0002511329,0.0000037820796],"about_ca_topic_score_codex":0.009295628,"about_ca_topic_score_gemma":0.0066792467,"teacher_disagreement_score":0.009295628,"about_ca_system_score_codex":0.0018772001,"about_ca_system_score_gemma":0.0014179697,"threshold_uncertainty_score":0.018483043},"labels":[],"label_agreement":null},{"id":"W1997898472","doi":"10.1016/j.epsr.2008.04.002","title":"A summary of demand response in electricity markets","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1837,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity; Electricity demand; Electricity market; Demand forecasting; Environmental economics; Economics; Microeconomics; Operations research; Business; Engineering; Electricity generation; Operations management; Power (physics); Electrical engineering","score_opus":0.026356077311784673,"score_gpt":0.2723813122681655,"score_spread":0.2460252349563808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997898472","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016122552,0.67296195,0.07890359,0.01488026,0.008002712,0.00019812371,0.0055150855,0.0005740526,0.20284164],"genre_scores_gemma":[0.10927315,0.70842344,0.039995644,0.0060008136,0.010757128,0.00019636788,0.006773626,0.00026779762,0.1183121],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995321,0.00009883544,0.00007720455,0.00008277643,0.00014472209,0.00006426568],"domain_scores_gemma":[0.9990476,0.0005298192,0.000065786975,0.000061010585,0.00024918336,0.00004673933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007281687,0.0008038369,0.00074291625,0.0024141897,0.0005600757,0.0028388142,0.00069960114,0.0009939792,0.017026825],"category_scores_gemma":[0.0023030865,0.0003011149,0.0006930854,0.0054756408,0.0003257155,0.0032634388,0.0005645431,0.0010278211,0.0054407693],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002231354,0.00020179436,0.0023146716,0.004874248,0.00010924449,0.00033051072,0.00023388249,0.015011037,0.0021849314,0.19987063,0.15298446,0.6216615],"study_design_scores_gemma":[0.000009366673,0.00021689426,0.0029526625,0.00072305603,0.000053211923,0.00041096858,0.00022386249,0.006567369,0.0011284233,0.07477586,0.912901,0.000037302478],"about_ca_topic_score_codex":0.00255997,"about_ca_topic_score_gemma":0.0029457663,"teacher_disagreement_score":0.017026825,"about_ca_system_score_codex":0.001071909,"about_ca_system_score_gemma":0.00080693705,"threshold_uncertainty_score":0.056960344},"labels":[],"label_agreement":null},{"id":"W1998115190","doi":"10.3390/s140100848","title":"NodePM: A Remote Monitoring Alert System for Energy Consumption Using Probabilistic Techniques","year":2014,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Real-time computing; Novelty detection; Probabilistic logic; Energy consumption; Power consumption; Electricity meter; Markov chain; Entropy (arrow of time); Smart grid; Wireless sensor network; Smart meter; Novelty; Embedded system; Artificial intelligence; Machine learning; Power (physics); Engineering; Computer network; Electrical engineering","score_opus":0.022362742521795397,"score_gpt":0.2330455566000565,"score_spread":0.2106828140782611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998115190","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024133923,0.00038153815,0.9607978,0.00016155031,0.000098829674,0.00011468161,0.00022237313,0.012396881,0.0016923606],"genre_scores_gemma":[0.6534887,0.000531209,0.3414251,0.00021813635,0.00015677288,0.00021387846,0.0006634609,0.00036760172,0.002935259],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999579,0.000077130746,0.000024362424,0.00010480992,0.00019559384,0.000019190538],"domain_scores_gemma":[0.9993807,0.00026542906,0.000105180305,0.000097876364,0.00011618584,0.000034567984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051072333,0.00061784836,0.00062721554,0.0009132195,0.00017696233,0.00046902924,0.001220339,0.0005536463,0.001471336],"category_scores_gemma":[0.0018020748,0.00023931691,0.00027673325,0.0005682641,0.00019019611,0.0013514837,0.00071583455,0.0005296503,0.00064474286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007370248,0.00033878125,0.009150214,0.0005582462,0.00021296776,0.00044942062,0.00026623762,0.04248572,0.077244736,0.0062852493,0.0100341635,0.8522373],"study_design_scores_gemma":[0.0000811751,0.00039838176,0.0067112166,0.00003563829,0.00010502715,0.00068930234,0.000047655525,0.9315582,0.03858164,0.005891366,0.015826566,0.00007384518],"about_ca_topic_score_codex":0.0004416723,"about_ca_topic_score_gemma":0.0005679614,"teacher_disagreement_score":0.001471336,"about_ca_system_score_codex":0.00022890267,"about_ca_system_score_gemma":0.00027685307,"threshold_uncertainty_score":0.0049221516},"labels":[],"label_agreement":null},{"id":"W1998161285","doi":"10.1080/15325008.2013.832439","title":"Smart Home Activities: A Literature Review","year":2014,"lang":"en","type":"review","venue":"Electric Power Components and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":183,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Home automation; Energy management; Smart grid; Scheduling (production processes); Electricity; Energy management system; Computer science; Automation; Operations research; Engineering; Operations management; Energy (signal processing); Telecommunications; Electrical engineering","score_opus":0.014553578967408493,"score_gpt":0.23490451698406098,"score_spread":0.22035093801665248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998161285","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00022249437,0.99776864,0.00010105546,0.00037725156,0.00012950524,0.000009007224,0.000060226612,0.0000055433666,0.0013263327],"genre_scores_gemma":[0.0013121217,0.9979899,0.00016030156,0.00013459729,0.00009076216,0.000007963284,0.00005070552,0.0000012962761,0.00025241036],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995178,0.00009579523,0.000104105595,0.000073186406,0.00017106165,0.00003802866],"domain_scores_gemma":[0.9982481,0.0010248794,0.00024187996,0.000028995812,0.00039445338,0.00006160082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008687737,0.00090562465,0.0015037998,0.00864905,0.0005095294,0.0018312895,0.0010394487,0.0009860843,0.008531938],"category_scores_gemma":[0.0023779576,0.00040525282,0.0010126459,0.010504796,0.0004833604,0.0020787625,0.0009073301,0.0009851167,0.0015616593],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006443803,0.00007261841,0.0007463356,0.10501051,0.00015521339,0.00038775997,0.00036991702,0.00033019166,0.00042670194,0.003849336,0.034210697,0.8543764],"study_design_scores_gemma":[0.000014776776,0.000081757134,0.0045312163,0.11636059,0.0006476919,0.0025374237,0.00076697394,0.0001492988,0.00029403038,0.0027308208,0.8718446,0.000040748037],"about_ca_topic_score_codex":0.0031098612,"about_ca_topic_score_gemma":0.005307906,"teacher_disagreement_score":0.00864905,"about_ca_system_score_codex":0.0008987191,"about_ca_system_score_gemma":0.0034315782,"threshold_uncertainty_score":0.028542161},"labels":[],"label_agreement":null},{"id":"W1998249080","doi":"10.1109/mpe.2012.2212617","title":"DC Versus AC: The Second War of Currents Has Already Begun [In My View]","year":2012,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presumption; Electricity; Electrical engineering; Power (physics); Power engineering; Engineering; Power flow; Mains electricity; Electric power system; Computer science; Political science; Voltage; Law; Physics; Power factor","score_opus":0.0180359284266145,"score_gpt":0.22154080704307338,"score_spread":0.20350487861645888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998249080","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008194941,0.067389734,0.0015960414,0.76975,0.088927515,0.000009621437,0.0000536524,0.00013159082,0.07132237],"genre_scores_gemma":[0.039846696,0.06608764,0.0018237832,0.64542854,0.09573009,0.000039347684,0.0001063029,0.000588101,0.15034947],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970811,0.00072948594,0.0001268757,0.0005134322,0.0011471171,0.00040195257],"domain_scores_gemma":[0.9955285,0.0016873684,0.00020357486,0.00029993764,0.0016704596,0.00061012415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030576522,0.0008619936,0.0008351492,0.0008766593,0.007038879,0.015897594,0.0012753864,0.00942587,0.021923132],"category_scores_gemma":[0.010288369,0.00045153397,0.0005926365,0.0013118109,0.010108396,0.01982529,0.0034091352,0.022967791,0.009483604],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058954276,0.000016657877,0.00018847977,0.00017491044,0.000010146493,0.00011586482,0.0017328162,0.000038421225,0.00030039522,0.08444339,0.864721,0.048199117],"study_design_scores_gemma":[0.0000033424376,0.00001166612,0.00007255242,0.00013216617,0.000002660923,0.00009022788,0.0010623107,0.000018168732,0.00010118852,0.009168951,0.98932505,0.000011709859],"about_ca_topic_score_codex":0.010417085,"about_ca_topic_score_gemma":0.016340243,"teacher_disagreement_score":0.021923132,"about_ca_system_score_codex":0.004094977,"about_ca_system_score_gemma":0.0033881904,"threshold_uncertainty_score":0.07334018},"labels":[],"label_agreement":null},{"id":"W1999395055","doi":"10.1109/epec.2014.11","title":"Accommodating High Levels of Renewable Generation in Remote Microgrids under Uncertainty","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Flexibility (engineering); Intermittency; Computer science; Grid; Probabilistic logic; Reliability engineering; Wind power; Energy storage; Electricity generation; Electric power system; Renewable resource; Distributed generation; Power (physics); Engineering; Electrical engineering","score_opus":0.021869472983349014,"score_gpt":0.22066467023512606,"score_spread":0.19879519725177705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999395055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65643996,0.00027080326,0.33507058,0.00027067016,0.000028428845,0.000055751556,0.00013936168,0.00025323403,0.007471269],"genre_scores_gemma":[0.99802905,0.00003738581,0.0016484612,0.0000052651158,0.0000046332934,0.00000816622,0.00001342556,0.0000068627705,0.00024676093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995229,0.00020791471,0.000021067543,0.000072923154,0.000096209646,0.000078973346],"domain_scores_gemma":[0.998863,0.00074931356,0.00020385798,0.00007814552,0.00006469249,0.000041070645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090552494,0.0006349213,0.00066418777,0.0002330914,0.00041615934,0.0009263478,0.00060264237,0.0005794532,0.00075345294],"category_scores_gemma":[0.0021356733,0.00039014875,0.0005555215,0.00038478477,0.00058793346,0.0012462686,0.0008762693,0.00058949355,0.000097609045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019320983,0.000006294184,0.00039003303,0.000012220819,0.000010586591,0.0001544346,0.000012610061,0.99628085,0.00052672863,0.001241793,0.000040797226,0.0013042891],"study_design_scores_gemma":[0.0000040176255,0.000029033585,0.00039230363,0.0000030287435,0.000007949946,0.00003656926,0.000023952696,0.99692106,0.0003323808,0.0021666656,0.00007765997,0.0000054037387],"about_ca_topic_score_codex":0.0039422675,"about_ca_topic_score_gemma":0.0033044997,"teacher_disagreement_score":0.0039422675,"about_ca_system_score_codex":0.0005860072,"about_ca_system_score_gemma":0.00041923588,"threshold_uncertainty_score":0.007838666},"labels":[],"label_agreement":null},{"id":"W1999581927","doi":"10.1016/j.rser.2015.03.033","title":"A review of demand side management business models in the electricity market","year":2015,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":313,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Independent Electricity System Operator","keywords":"Demand response; Environmental economics; Value proposition; Renewable energy; Smart grid; Database transaction; Business model; Electricity market; Electricity; Business; Load shifting; Industrial organization; Computer science; Economics; Engineering; Electrical engineering; Marketing","score_opus":0.02555825084103646,"score_gpt":0.25498175909406295,"score_spread":0.2294235082530265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999581927","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001637729,0.997472,0.000348159,0.0004542337,0.00017818899,0.0000048532174,0.000023705048,0.000005391114,0.0013497499],"genre_scores_gemma":[0.001249789,0.99756795,0.00037002753,0.00023097616,0.00017759466,0.0000043987934,0.000024939787,0.0000014827033,0.00037278215],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99951243,0.00010948575,0.00007987615,0.000069685695,0.00019392445,0.000034571614],"domain_scores_gemma":[0.9984968,0.00097238185,0.00018953178,0.000027865091,0.000263696,0.000049781982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001139293,0.0009173414,0.0012081884,0.0026943344,0.00030265524,0.0017937287,0.0009185033,0.0012104685,0.003665103],"category_scores_gemma":[0.0024614504,0.00035978705,0.00068095495,0.0047178203,0.0004858081,0.0025745486,0.00058079266,0.001475948,0.0009488577],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006073247,0.00011371603,0.000324392,0.034221034,0.00012923643,0.00014731476,0.00009473154,0.0016434996,0.000776749,0.02284017,0.041684967,0.8979634],"study_design_scores_gemma":[0.000017310422,0.000114336755,0.0012226781,0.015102401,0.0002461374,0.0006036443,0.00012519925,0.0008009821,0.00034008187,0.009972164,0.9714109,0.00004426581],"about_ca_topic_score_codex":0.0018651143,"about_ca_topic_score_gemma":0.003798618,"teacher_disagreement_score":0.003665103,"about_ca_system_score_codex":0.0009206526,"about_ca_system_score_gemma":0.0019480954,"threshold_uncertainty_score":0.012260973},"labels":[],"label_agreement":null},{"id":"W2000588675","doi":"10.1109/iecon.2012.6389115","title":"A review on energy efficiency optimization in Smart Grid","year":2012,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Smart grid; Efficient energy use; Electricity; Production (economics); Electricity generation; Energy consumption; Computer science; Distributed generation; Energy storage; Energy accounting; Energy (signal processing); Greenhouse gas; Energy engineering; Consumption (sociology); Energy supply; Process engineering; Environmental science; Renewable energy; Engineering; Electrical engineering; Economics; Power (physics); Microeconomics","score_opus":0.030515120865468724,"score_gpt":0.2559327923802726,"score_spread":0.22541767151480388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000588675","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021653195,0.9947196,0.0013103933,0.00042024202,0.00043206272,0.000008505248,0.000027646975,0.0000153856,0.002849517],"genre_scores_gemma":[0.0016309309,0.9958603,0.0009823417,0.0001781836,0.00036595733,0.000009530594,0.000040190862,0.0000047220146,0.0009279153],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996736,0.00005670364,0.000045912646,0.00005401233,0.00014745387,0.00002240059],"domain_scores_gemma":[0.9993425,0.00031461616,0.00007338301,0.000022102964,0.00022185314,0.000025596059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056013954,0.0011090592,0.0013921626,0.0019294636,0.00032421848,0.0010337756,0.0009905013,0.001193085,0.00409672],"category_scores_gemma":[0.0009295142,0.0004531155,0.0006052557,0.0048865485,0.00038722725,0.0018046398,0.00052770047,0.0012617367,0.00232632],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061745675,0.00011346235,0.0002618905,0.022696514,0.0000945847,0.0002600639,0.00007837025,0.0022342692,0.0019337767,0.010178192,0.04887461,0.91321254],"study_design_scores_gemma":[0.0000098729415,0.00010794354,0.0006583977,0.0048012533,0.0001213275,0.00087765185,0.000068258574,0.00056187314,0.0009713529,0.0042993217,0.9874889,0.00003381285],"about_ca_topic_score_codex":0.0010805761,"about_ca_topic_score_gemma":0.0013915793,"teacher_disagreement_score":0.00409672,"about_ca_system_score_codex":0.0005911813,"about_ca_system_score_gemma":0.0012863262,"threshold_uncertainty_score":0.013704896},"labels":[],"label_agreement":null},{"id":"W2001460357","doi":"10.1109/smartgridcomm.2014.7007635","title":"Optimal energy management for building microgrid with constrained renewable energy utilization","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"","keywords":"Microgrid; Renewable energy; Computer science; Energy management; Energy storage; Energy engineering; Demand response; Electricity; Environmental economics; Energy (signal processing); Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.009024841348890263,"score_gpt":0.19410977006592803,"score_spread":0.18508492871703777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001460357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07342067,0.0005924428,0.91655415,0.00039101377,0.000054711985,0.00007523135,0.00013082485,0.00019393052,0.008587083],"genre_scores_gemma":[0.9819971,0.00025322058,0.01612692,0.000040420855,0.000017874489,0.000058870133,0.00004250435,0.00002156704,0.0014414501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964845,0.00011536029,0.000012979803,0.000064931584,0.00007577731,0.000082511615],"domain_scores_gemma":[0.9997346,0.00011645332,0.00006204811,0.000015910171,0.000046558343,0.00002440915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055844,0.0008815113,0.0008859458,0.00030280303,0.0003380168,0.0009609735,0.0006528137,0.0006027214,0.0017350834],"category_scores_gemma":[0.0010774621,0.000447273,0.0005411797,0.0005429019,0.00044755684,0.0007242054,0.0007933566,0.0006659301,0.00014547961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015408468,0.000010131879,0.00015112756,0.000024491537,0.000012549979,0.00004094741,0.000013128982,0.99205136,0.0005422685,0.00394747,0.00019294131,0.0029981674],"study_design_scores_gemma":[0.000004031033,0.000014046254,0.00007387234,0.0000022325007,0.0000043880145,0.0000060818397,0.000009773562,0.9977253,0.000114771654,0.0019080474,0.00013484307,0.000002533393],"about_ca_topic_score_codex":0.005409388,"about_ca_topic_score_gemma":0.0053142034,"teacher_disagreement_score":0.005409388,"about_ca_system_score_codex":0.00068730104,"about_ca_system_score_gemma":0.001100613,"threshold_uncertainty_score":0.010755837},"labels":[],"label_agreement":null},{"id":"W2001581725","doi":"10.1109/wf-iot.2014.6803184","title":"A modular framework for cost optimization in smart grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Modular design; Smart grid; Computer science; Distributed computing; Grid; Demand response; Energy consumption; Dependency (UML); Distributed generation; Electric power system; Optimization problem; Electricity generation; Embedded system; Industrial engineering; Power (physics); Renewable energy; Electricity; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.008724237931077246,"score_gpt":0.20664663499775124,"score_spread":0.197922397066674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001581725","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00105525,0.00015680485,0.9948303,0.00016710137,0.000024541063,0.00002565551,0.000028915114,0.000120533434,0.0035908686],"genre_scores_gemma":[0.2110293,0.0010771616,0.7800204,0.00013424306,0.00020482083,0.00053758867,0.00019495496,0.00023585884,0.0065655545],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991322,0.0003180229,0.000044479446,0.00011927656,0.00030282733,0.00008321734],"domain_scores_gemma":[0.9995235,0.00020652912,0.000042505875,0.00010246031,0.00009162061,0.000033346194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018632574,0.0014150222,0.0009904588,0.00069107703,0.0005733095,0.0017308161,0.0017854994,0.0009997331,0.004217692],"category_scores_gemma":[0.0023156372,0.00065422227,0.0015063006,0.001318703,0.0014113212,0.0024954327,0.0016763133,0.002196489,0.0010008548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013447903,0.000030992465,0.00013479008,0.00006511636,0.000028137618,0.00005331303,0.000046310237,0.38070145,0.00068296015,0.590412,0.0017032768,0.02612831],"study_design_scores_gemma":[0.0000158722,0.000021201466,0.0000525258,0.00001759384,0.000015268164,0.000023636701,0.000012392608,0.73637706,0.0003866262,0.25511712,0.007950262,0.000010432976],"about_ca_topic_score_codex":0.0028882104,"about_ca_topic_score_gemma":0.0031484282,"teacher_disagreement_score":0.004217692,"about_ca_system_score_codex":0.0014302628,"about_ca_system_score_gemma":0.001687002,"threshold_uncertainty_score":0.014109552},"labels":[],"label_agreement":null},{"id":"W2001816095","doi":"10.1109/smartgridcomm.2014.7007661","title":"A novel distributed algorithm for power loss minimizing in Smart Grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Science and Engineering Research Board; Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart grid; Power grid; Distributed computing; Distributed algorithm; Algorithm; Power (physics); Electrical engineering; Engineering","score_opus":0.007859036967430502,"score_gpt":0.19738279715932178,"score_spread":0.18952376019189127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001816095","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005999753,0.0001391939,0.9923315,0.000076320575,0.000037913855,0.00002820352,0.000012698218,0.00026393513,0.0011105669],"genre_scores_gemma":[0.5476233,0.00025476815,0.4477439,0.00013547535,0.00008634535,0.00024161425,0.000114354654,0.00009758221,0.0037026769],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963987,0.00007292243,0.00001989541,0.000098405915,0.00012175438,0.000047152225],"domain_scores_gemma":[0.99970216,0.00012681629,0.000039616145,0.000029267383,0.000080955244,0.000021225449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054842775,0.0007450816,0.0011176224,0.0004732055,0.000569581,0.00077347923,0.0012241862,0.00075334706,0.0017226533],"category_scores_gemma":[0.0009763453,0.00028139618,0.00037262612,0.0008102773,0.0005087977,0.0010980143,0.0008769229,0.00062471075,0.00029944073],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014769146,0.00007588821,0.0004600586,0.0000860589,0.00003805251,0.00006906637,0.00008252929,0.8118296,0.00447727,0.012178262,0.003071022,0.16748452],"study_design_scores_gemma":[0.000028980883,0.000029494591,0.00004807333,0.0000028540326,0.000004596611,0.000021998978,0.00000793162,0.99590045,0.0005489573,0.002673976,0.00072912226,0.0000035637865],"about_ca_topic_score_codex":0.0018251592,"about_ca_topic_score_gemma":0.0021081404,"teacher_disagreement_score":0.0018251592,"about_ca_system_score_codex":0.00066166435,"about_ca_system_score_gemma":0.00083550456,"threshold_uncertainty_score":0.005762875},"labels":[],"label_agreement":null},{"id":"W2005154127","doi":"10.1109/ccece.2012.6334913","title":"A wireless sensor network for residential electrical energy consumption measurement","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Wireless sensor network; Ethernet; Microcontroller; Wireless; Energy consumption; Computer science; Key distribution in wireless sensor networks; Battery (electricity); Wi-Fi array; Transmitter; Electrical engineering; Computer network; Embedded system; Wireless network; Engineering; Telecommunications","score_opus":0.026864364974529042,"score_gpt":0.2162157072541231,"score_spread":0.18935134227959405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005154127","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019146984,0.0044652806,0.9360783,0.0011746711,0.0007706562,0.00039705317,0.0005200786,0.005341429,0.032105442],"genre_scores_gemma":[0.4366459,0.0073713735,0.47375536,0.001147736,0.00061358843,0.0009640705,0.0019771212,0.0002657573,0.0772592],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991991,0.00020811254,0.000041052037,0.00008693817,0.00043076504,0.00003407851],"domain_scores_gemma":[0.9996474,0.0000470154,0.000030248355,0.000046806745,0.00020263977,0.000025957313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044467533,0.00040620237,0.0004010394,0.00043882607,0.00044148308,0.00052166986,0.00075045804,0.00063798303,0.003924117],"category_scores_gemma":[0.0005090284,0.00016392968,0.00018309527,0.00068786985,0.0001552153,0.0011787596,0.0005047599,0.00050851726,0.0019100268],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004274021,0.00028026797,0.0036730394,0.0006980069,0.00008922341,0.0006285466,0.00012564735,0.01657538,0.15321049,0.021807132,0.07598063,0.72650427],"study_design_scores_gemma":[0.00013592705,0.0011968126,0.005994976,0.00016392868,0.00012885404,0.002594227,0.00013064462,0.2674296,0.11683604,0.010057621,0.5952049,0.00012656825],"about_ca_topic_score_codex":0.0005298043,"about_ca_topic_score_gemma":0.0010740003,"teacher_disagreement_score":0.003924117,"about_ca_system_score_codex":0.00035174363,"about_ca_system_score_gemma":0.00039366697,"threshold_uncertainty_score":0.013127506},"labels":[],"label_agreement":null},{"id":"W2005399662","doi":"10.1109/smartgridcomm.2014.7007636","title":"Coordinated dispatch of renewable energy sources and HVAC load using stochastic programming","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"HVAC; Dispatchable generation; Renewable energy; Demand response; Virtual power plant; Computer science; Wind power; Stochastic programming; Grid; Air conditioning; Automotive engineering; Electric power system; Solar power; Reliability engineering; Mathematical optimization; Electricity; Power (physics); Engineering; Distributed generation; Electrical engineering; Mechanical engineering","score_opus":0.006771273974140371,"score_gpt":0.18436504099282316,"score_spread":0.1775937670186828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005399662","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0744489,0.0002580368,0.91792727,0.00034489678,0.000074899304,0.000103044316,0.00018040174,0.00025244814,0.006410056],"genre_scores_gemma":[0.95848006,0.00020864507,0.038415354,0.000060234877,0.000047235633,0.000122122,0.00013634312,0.000051477124,0.0024785416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991665,0.00037113726,0.000029256918,0.00013070343,0.00016303173,0.00013927765],"domain_scores_gemma":[0.9988763,0.00065471575,0.00022720626,0.000034662215,0.000112638736,0.0000945266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001374207,0.0012116659,0.0016348959,0.0004708408,0.00039619146,0.0014926126,0.0010081499,0.00081713044,0.0016155667],"category_scores_gemma":[0.0022935125,0.0008914788,0.00085032504,0.0008628894,0.00067058246,0.0010020813,0.000832549,0.0010524729,0.00018245062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014874159,0.0000063775296,0.000071894814,0.000004838751,0.0000072116577,0.0000096843305,0.0000036437034,0.9973406,0.000073436175,0.0014793539,0.00006051218,0.00092751323],"study_design_scores_gemma":[0.0000037165505,0.00000759823,0.000025314877,6.872842e-7,0.0000017305188,0.0000013567836,0.0000018916683,0.99915123,0.000029365125,0.00072825333,0.000047724207,0.0000012578703],"about_ca_topic_score_codex":0.0104446225,"about_ca_topic_score_gemma":0.010747338,"teacher_disagreement_score":0.0104446225,"about_ca_system_score_codex":0.0014932937,"about_ca_system_score_gemma":0.0019477986,"threshold_uncertainty_score":0.02076763},"labels":[],"label_agreement":null},{"id":"W2006920596","doi":"10.1109/tsg.2014.2363119","title":"Open Energy Market Strategies in Microgrids: A Stackelberg Game Approach Based on a Hybrid Multiobjective Evolutionary Algorithm","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Renewable energy; Computer science; Exploit; Stackelberg competition; Mathematical optimization; Evolutionary algorithm; Leverage (statistics); Multi-objective optimization; Context (archaeology); Profit (economics); Smart grid; Environmental economics; Economics; Engineering; Microeconomics; Artificial intelligence; Mathematics","score_opus":0.008106613428118603,"score_gpt":0.20606853042354162,"score_spread":0.197961916995423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006920596","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03512894,0.0002385015,0.95612067,0.00036875127,0.000039023627,0.000087125605,0.00003566817,0.00006957278,0.007911651],"genre_scores_gemma":[0.84631574,0.0003969873,0.14619352,0.00016494439,0.000038217146,0.0002895654,0.000051661165,0.000032613378,0.0065167346],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959284,0.0002037499,0.000013447634,0.000051074745,0.000080999824,0.00005790652],"domain_scores_gemma":[0.9995419,0.00029485385,0.00004792068,0.0000128242555,0.00005117858,0.00005127555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001059095,0.00090345234,0.0011219089,0.0006436853,0.0005341453,0.0015055736,0.0017242285,0.0015075972,0.0022722613],"category_scores_gemma":[0.0018329718,0.00042515728,0.00092575926,0.0005260051,0.0010580078,0.0013990812,0.0012151262,0.00096339954,0.00019086666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017746308,0.000029332783,0.00017051143,0.00001946361,0.000027695627,0.00006113494,0.000038618266,0.9661546,0.00037399295,0.028307429,0.00022276028,0.004576661],"study_design_scores_gemma":[0.0000057587094,0.000011984237,0.000020531306,0.0000022834502,0.0000044495023,0.0000066131443,0.000007748748,0.9949786,0.000038333284,0.004765975,0.0001550965,0.0000027279664],"about_ca_topic_score_codex":0.005020316,"about_ca_topic_score_gemma":0.0039307275,"teacher_disagreement_score":0.005020316,"about_ca_system_score_codex":0.0012397564,"about_ca_system_score_gemma":0.0013276215,"threshold_uncertainty_score":0.009982169},"labels":[],"label_agreement":null},{"id":"W2007462323","doi":"10.1109/i2mtc.2012.6229453","title":"Nonintrusive load monitoring of electrical devices in health smart homes","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Electrical load; Classifier (UML); Profiling (computer programming); Real-time computing; Voltage; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.011026594832035518,"score_gpt":0.23794249904784204,"score_spread":0.2269159042158065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007462323","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54517674,0.0014765696,0.44415537,0.00031734933,0.00011205795,0.00012286284,0.00026477373,0.0028549756,0.005519303],"genre_scores_gemma":[0.9768306,0.00020499872,0.021021146,0.00006379239,0.00003693746,0.00002407953,0.00009492265,0.000028657612,0.0016948578],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995586,0.00011379294,0.00002315149,0.00008694697,0.00019279712,0.000024682007],"domain_scores_gemma":[0.9996569,0.00012236362,0.00007879554,0.000054860106,0.000069421796,0.00001765758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021413894,0.00042522172,0.00035524604,0.00044106852,0.00018313069,0.00036068668,0.00052274053,0.0002994447,0.0007234763],"category_scores_gemma":[0.00076818786,0.00018035616,0.00012721965,0.00028368883,0.0001480382,0.000630558,0.0004318404,0.00019558273,0.00042584664],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077614724,0.00035860165,0.03838204,0.00037219786,0.00007305737,0.0006969917,0.00041637677,0.029955814,0.22712079,0.0009267357,0.003949672,0.69697154],"study_design_scores_gemma":[0.000048498736,0.0008191648,0.06846553,0.00008432404,0.00009007015,0.0018601496,0.0002756567,0.7450363,0.17112973,0.0021363595,0.009993255,0.00006106959],"about_ca_topic_score_codex":0.00064509903,"about_ca_topic_score_gemma":0.0014877922,"teacher_disagreement_score":0.0007234763,"about_ca_system_score_codex":0.00017306722,"about_ca_system_score_gemma":0.00011097081,"threshold_uncertainty_score":0.0024203062},"labels":[],"label_agreement":null},{"id":"W2008800859","doi":"10.1109/ifsa-nafips.2013.6608437","title":"Genetic optimization of a fuzzy control system for energy flow management in micro-grids","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Microgrid; Fuzzy logic; Computer science; Energy management; Genetic algorithm; Fuzzy control system; Energy storage; Controller (irrigation); Energy management system; Control engineering; Grid; Smart grid; Energy (signal processing); Power (physics); Control (management); Engineering; Electrical engineering; Artificial intelligence","score_opus":0.003324641379228141,"score_gpt":0.156444654595254,"score_spread":0.15312001321602586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2008800859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07428068,0.00036465607,0.91684467,0.0003730143,0.00012489113,0.000112658985,0.000039309532,0.0003382993,0.007521811],"genre_scores_gemma":[0.94103724,0.00013414201,0.05628215,0.00007301868,0.000019617339,0.00011360236,0.00002598994,0.000017613267,0.002296615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997886,0.000066531575,0.000008654953,0.00004141793,0.000066747394,0.00002805919],"domain_scores_gemma":[0.9998061,0.00009095309,0.00003060595,0.000009427535,0.00005232559,0.000010557371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055755395,0.0004948107,0.00038241767,0.00031772227,0.00040416236,0.00084165606,0.00045149628,0.0005936411,0.0013217466],"category_scores_gemma":[0.0009650821,0.00019146709,0.00031509096,0.00028754192,0.0005411735,0.00032381198,0.00027470363,0.00048922014,0.00015496214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003464523,0.000023134515,0.0002108899,0.00001998135,0.000020106803,0.000031259682,0.000025458647,0.9763693,0.0019417679,0.0046938295,0.00022507935,0.01640454],"study_design_scores_gemma":[0.000010287805,0.000027268667,0.00007935927,0.0000028640275,0.000005455814,0.000005052072,0.0000051047555,0.9980956,0.00044369354,0.0010327874,0.0002897622,0.0000026738933],"about_ca_topic_score_codex":0.009987765,"about_ca_topic_score_gemma":0.00694636,"teacher_disagreement_score":0.009987765,"about_ca_system_score_codex":0.00085034646,"about_ca_system_score_gemma":0.0010039596,"threshold_uncertainty_score":0.019859254},"labels":[],"label_agreement":null},{"id":"W2009766558","doi":"10.1109/waina.2015.128","title":"Demand Response: From Classification to Optimization Techniques in Smart Grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Prosumer; Demand response; Computer science; Grid; Distributed generation; Electric power system; Electric power industry; Electric utility; Electricity; Distributed computing; Power (physics); Engineering; Renewable energy; Electrical engineering","score_opus":0.025077826871615146,"score_gpt":0.23468093699169174,"score_spread":0.2096031101200766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009766558","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0065212003,0.017593022,0.95803213,0.0024537246,0.00025059024,0.00008590798,0.00012038228,0.00025105287,0.014692045],"genre_scores_gemma":[0.38682744,0.03519318,0.5619997,0.0013311666,0.0026035628,0.0003397025,0.00050683314,0.00024065978,0.010957876],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988777,0.000438192,0.00009505521,0.00018162197,0.0003433201,0.00006413749],"domain_scores_gemma":[0.9986405,0.0008185613,0.0001435863,0.00012257144,0.00024033894,0.000034403838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013078848,0.00090741436,0.0010828304,0.0017784222,0.00038677143,0.0023769508,0.0011141038,0.0012309379,0.0021549382],"category_scores_gemma":[0.0031694302,0.00034235185,0.00077415473,0.0035059184,0.0010330018,0.0037941923,0.0008185882,0.001965837,0.00075228215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001320453,0.00018554718,0.0022525406,0.00092991185,0.00007518356,0.000104343424,0.00035213254,0.16427833,0.001975536,0.26689178,0.011062472,0.5517602],"study_design_scores_gemma":[0.000017285261,0.00009264764,0.0011655152,0.00023211521,0.000028019153,0.00014101907,0.00023586227,0.7415638,0.0014469888,0.22525443,0.029773869,0.00004849556],"about_ca_topic_score_codex":0.0013892098,"about_ca_topic_score_gemma":0.0009695783,"teacher_disagreement_score":0.0023769508,"about_ca_system_score_codex":0.0009775236,"about_ca_system_score_gemma":0.0004502119,"threshold_uncertainty_score":0.007209003},"labels":[],"label_agreement":null},{"id":"W2010036759","doi":"10.1109/ccece.2014.6900995","title":"A decentralised electricity market model: An electric vehicle charging example","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Electricity market; Electricity; Industrial organization; Electric vehicle; Market clearing; Upgrade; Service (business); Computer science; Business; Microeconomics; Economics; Engineering; Marketing","score_opus":0.01108474281165978,"score_gpt":0.1916182282544926,"score_spread":0.18053348544283282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010036759","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21606888,0.0010533901,0.41841456,0.005978386,0.0002606528,0.00029601733,0.0010134402,0.00036904335,0.35654566],"genre_scores_gemma":[0.9399999,0.00046988062,0.025375929,0.00016699109,0.000065102184,0.00012560257,0.00011278641,0.000037483038,0.03364628],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995258,0.00021780965,0.00001586328,0.000065484564,0.00009159942,0.00008342815],"domain_scores_gemma":[0.9994019,0.0002590862,0.00006913779,0.000065241904,0.00009410292,0.00011053194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069922954,0.00040239026,0.00065247633,0.00041867254,0.0010028029,0.0019027403,0.0014552508,0.0021403162,0.012749136],"category_scores_gemma":[0.0014921436,0.0003296099,0.0007925931,0.0009750006,0.0014229327,0.0022026615,0.0017941156,0.0016443313,0.0009101584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093410745,0.00011471105,0.00041969403,0.000056305234,0.00002386484,0.0006358018,0.0002186455,0.35822007,0.0007451151,0.63340473,0.0023474202,0.003720227],"study_design_scores_gemma":[0.0001481213,0.00006161527,0.00023470963,0.00001617021,0.000012081073,0.00016502803,0.00018095801,0.8240358,0.00016242101,0.16775319,0.007207025,0.000022820097],"about_ca_topic_score_codex":0.006611587,"about_ca_topic_score_gemma":0.0057978216,"teacher_disagreement_score":0.012749136,"about_ca_system_score_codex":0.0013319021,"about_ca_system_score_gemma":0.0010926089,"threshold_uncertainty_score":0.042650104},"labels":[],"label_agreement":null},{"id":"W2010133122","doi":"10.1109/greencom.2011.6082506","title":"Dynamic pricing for demand-side management in the smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Electricity; Dynamic pricing; Electricity pricing; Computer science; Environmental economics; Revenue; Grid; Renewable energy; Electricity market; Electricity retailing; Demand response; Reliability (semiconductor); Demand side; Business; Microeconomics; Economics; Engineering; Power (physics); Finance","score_opus":0.015068727897888224,"score_gpt":0.2033111373768668,"score_spread":0.18824240947897858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010133122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03247447,0.0006186492,0.94486576,0.0010609694,0.00017927901,0.000106570165,0.00003818789,0.00017419872,0.0204819],"genre_scores_gemma":[0.95443004,0.00038615317,0.040189642,0.000107551634,0.000098480654,0.00006053629,0.00002195714,0.000027573222,0.004677918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990056,0.00046815994,0.00003106306,0.000097541684,0.00027842695,0.00011914686],"domain_scores_gemma":[0.999503,0.0002766087,0.00004969964,0.00004490519,0.00008629015,0.000039469076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010364925,0.00046133535,0.0006389259,0.00026721542,0.0005935585,0.0015746017,0.00097515906,0.0008674407,0.0027575672],"category_scores_gemma":[0.0022961206,0.0002851091,0.00045952597,0.0005443167,0.00081121986,0.0020623067,0.0006854773,0.000956509,0.00028998303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012307004,0.000104629835,0.00046441497,0.00007831138,0.000029092085,0.00029400914,0.0001527579,0.5885817,0.0029003234,0.35160884,0.0033640908,0.05229881],"study_design_scores_gemma":[0.000014614139,0.000026072503,0.000073477466,0.000004471195,0.000007023385,0.00004878665,0.00002791921,0.9515796,0.00037807217,0.04602907,0.0018002051,0.000010783562],"about_ca_topic_score_codex":0.0028004288,"about_ca_topic_score_gemma":0.0036234427,"teacher_disagreement_score":0.0028004288,"about_ca_system_score_codex":0.0011582595,"about_ca_system_score_gemma":0.0012801553,"threshold_uncertainty_score":0.009225011},"labels":[],"label_agreement":null},{"id":"W2010322174","doi":"10.1109/tsg.2014.2363098","title":"User-Aware Game Theoretic Approach for Demand Management","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Scalability; Regret; Overhead (engineering); Demand response; Energy consumption; Load management; Game theory; Matching (statistics); Operations research; Mathematical optimization; Distributed computing; Engineering; Microeconomics; Economics","score_opus":0.008396009569244096,"score_gpt":0.19732751168936444,"score_spread":0.18893150212012033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010322174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0064833914,0.000069726586,0.9860184,0.00024497713,0.000028590339,0.00010839748,0.00004660535,0.00009302976,0.006906861],"genre_scores_gemma":[0.80421877,0.00027253132,0.18558961,0.0002750481,0.0000832774,0.00035789216,0.000092432754,0.00007149861,0.009038883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978083,0.0012508248,0.000058265443,0.00023782966,0.00046598972,0.00017872363],"domain_scores_gemma":[0.9990689,0.0004932685,0.000095219955,0.0000823686,0.00016779639,0.00009236491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016602768,0.0012158869,0.00091782835,0.00053469616,0.0006312946,0.0014621009,0.0022750185,0.0013765714,0.004207581],"category_scores_gemma":[0.0022975116,0.0004889039,0.0007561684,0.00079650985,0.0011406787,0.0021327306,0.001432004,0.0017858945,0.0005676483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009814896,0.00018830092,0.0004999089,0.00010574416,0.00007333449,0.00016615217,0.00017544965,0.77092624,0.003957303,0.20167994,0.0022820514,0.019847438],"study_design_scores_gemma":[0.000010406261,0.000033123237,0.000056775552,0.0000030457525,0.00000777064,0.000033281332,0.000022209742,0.9770155,0.0003329459,0.021316184,0.0011580511,0.000010679038],"about_ca_topic_score_codex":0.0028871146,"about_ca_topic_score_gemma":0.0037781477,"teacher_disagreement_score":0.004207581,"about_ca_system_score_codex":0.0017251947,"about_ca_system_score_gemma":0.0015804794,"threshold_uncertainty_score":0.014075756},"labels":[],"label_agreement":null},{"id":"W2010721526","doi":"10.2316/journal.203.2010.3.203-4219","title":"ON THE INVISIBLE SOCIO-TECHNICAL SYSTEMS – THE GREAT UNKNOWN","year":2010,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.006693489474506528,"score_gpt":0.20812567197478843,"score_spread":0.2014321825002819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010721526","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.079697356,0.04416727,0.031477425,0.3229798,0.0038091282,0.00011356956,0.00022020811,0.00037643645,0.51715887],"genre_scores_gemma":[0.9349714,0.0158256,0.0044914647,0.012885154,0.0014730956,0.00010292788,0.00007321099,0.0002601458,0.029917076],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.991757,0.005130418,0.0001615874,0.0006691393,0.0016526569,0.00062908523],"domain_scores_gemma":[0.9869833,0.008348464,0.00068221055,0.0023847448,0.0007880184,0.0008132131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007877523,0.00075249723,0.0007785781,0.0022880265,0.010250029,0.01590207,0.0015524167,0.004272066,0.008703918],"category_scores_gemma":[0.011173679,0.0004811665,0.0005352012,0.0016910229,0.07557681,0.029363004,0.014276867,0.006755809,0.0013088756],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024489404,0.000032476437,0.0007104775,0.00023486288,0.000021211808,0.0003811688,0.07748063,0.000322425,0.00042051947,0.8832644,0.013684447,0.023422947],"study_design_scores_gemma":[0.000012379694,0.000032275904,0.0008417177,0.0005170541,0.000013073181,0.00032166866,0.04388705,0.00036528186,0.00018836076,0.45388022,0.4999039,0.00003706978],"about_ca_topic_score_codex":0.0034562866,"about_ca_topic_score_gemma":0.0031845218,"teacher_disagreement_score":0.01590207,"about_ca_system_score_codex":0.0051186928,"about_ca_system_score_gemma":0.0038252193,"threshold_uncertainty_score":0.041660845},"labels":[],"label_agreement":null},{"id":"W2013061330","doi":"10.1109/isgt-asia.2012.6303401","title":"Toward low carbon energy systems: The convergence of wind power, demand response, and the electricity grid","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Wind power; Dispatchable generation; Demand response; Renewable energy; Environmental economics; Distributed generation; Electric power system; Intermittent energy source; Electricity generation; Electricity; Stand-alone power system; Electricity retailing; Pumped-storage hydroelectricity; Fossil fuel; Smart grid; Computer science; Electricity market; Engineering; Power (physics); Electrical engineering; Economics; Waste management","score_opus":0.006502136664824979,"score_gpt":0.17488252502522625,"score_spread":0.16838038836040126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013061330","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12070672,0.0335109,0.40768,0.18112944,0.0015047261,0.00013143964,0.000105037456,0.00037980222,0.25485197],"genre_scores_gemma":[0.8871009,0.019934239,0.07207834,0.004233431,0.0013170068,0.000109376444,0.000047406884,0.00008609455,0.015093113],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921834,0.00034628288,0.000019522988,0.00008687213,0.0002483384,0.00008053652],"domain_scores_gemma":[0.99942124,0.0002309727,0.000073820425,0.00003999726,0.00011256442,0.00012136228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001591441,0.00056104944,0.00050946086,0.00068417494,0.0011339842,0.006415215,0.000837987,0.003676718,0.0033206176],"category_scores_gemma":[0.0015121361,0.0003115988,0.00027645743,0.00092139456,0.004518561,0.007576976,0.0027521022,0.0037600512,0.000547604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044198023,0.000059478796,0.0008558109,0.0001411946,0.000011866684,0.00025965596,0.0005531367,0.011526287,0.0015468657,0.94621795,0.0032614982,0.035522122],"study_design_scores_gemma":[0.00003059312,0.00007952812,0.00096759555,0.0002211427,0.0000090593985,0.0002624567,0.0014305367,0.049898997,0.0010809946,0.8870161,0.058965437,0.000037615682],"about_ca_topic_score_codex":0.0013349634,"about_ca_topic_score_gemma":0.0022318708,"teacher_disagreement_score":0.006415215,"about_ca_system_score_codex":0.0018852287,"about_ca_system_score_gemma":0.001414812,"threshold_uncertainty_score":0.0136784315},"labels":[],"label_agreement":null},{"id":"W2013503339","doi":"10.1109/eem.2010.5558742","title":"Stochastic analysis of a local distribution company voltage profile under uncertain energy supply from a photovoltaic system","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Photovoltaic system; Grid; Voltage; Incentive; Monte Carlo method; Installation; Distributed generation; Environmental economics; Low voltage; Computer science; Automotive engineering; Electrical engineering; Reliability engineering; Engineering; Economics; Microeconomics; Mechanical engineering; Mathematics","score_opus":0.005596221177215109,"score_gpt":0.18924023680031574,"score_spread":0.18364401562310062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013503339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9593165,0.00013565269,0.03738258,0.00024150767,0.000007810787,0.000029348286,0.00023674955,0.000097481556,0.002552411],"genre_scores_gemma":[0.998838,0.000039280727,0.0006151913,0.0000062951017,0.0000029435298,0.000004723585,0.00006527864,0.0000060564403,0.00042222225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949217,0.00021455511,0.000013405627,0.00006730152,0.000107602515,0.000104861094],"domain_scores_gemma":[0.9960769,0.0028425516,0.00046892418,0.00008992154,0.00037436862,0.00014734305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013841565,0.00033739075,0.00044823738,0.00051022996,0.0004054464,0.0009286862,0.00055705546,0.0006009492,0.0009760709],"category_scores_gemma":[0.0050405264,0.00040882453,0.0003969731,0.000605117,0.0007889125,0.0004966531,0.000375995,0.0006105932,0.000090873946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058184953,0.00001242888,0.0027739315,0.000009230767,0.000017771454,0.00017267602,0.000032052103,0.9938892,0.0006144111,0.0014648963,0.00011710495,0.00083817414],"study_design_scores_gemma":[0.0000036251463,0.000017357344,0.0019027026,0.0000014427567,0.000005339496,0.00001771693,0.000027948716,0.9974928,0.00014790794,0.00034575016,0.000031628693,0.000005833154],"about_ca_topic_score_codex":0.053452637,"about_ca_topic_score_gemma":0.03814412,"teacher_disagreement_score":0.053452637,"about_ca_system_score_codex":0.0024581803,"about_ca_system_score_gemma":0.0005836269,"threshold_uncertainty_score":0.10628301},"labels":[],"label_agreement":null},{"id":"W2014410569","doi":"10.1109/coase.2013.6653961","title":"Managing demand response for manufacturing enterprises via renewable energy integration","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Demand response; Renewable energy; Newsvendor model; Leverage (statistics); Electricity; Business; Revenue; Environmental economics; Load management; Contingency; Peak demand; Industrial organization; Computer science; Economics; Finance; Supply chain; Engineering","score_opus":0.006145024480130285,"score_gpt":0.18813289602131153,"score_spread":0.18198787154118123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2014410569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2720707,0.0004298156,0.71274304,0.0010642179,0.000087998145,0.00017346207,0.0001278422,0.001013701,0.0122892065],"genre_scores_gemma":[0.9782762,0.00006993904,0.020627258,0.00005007669,0.000020459875,0.000028935992,0.000048348662,0.00002311645,0.0008556988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991498,0.00032637647,0.000044098986,0.00014960983,0.00018059665,0.00014957771],"domain_scores_gemma":[0.9986141,0.00067839655,0.00026094398,0.00016384787,0.00017582119,0.00010687113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015580687,0.0005880262,0.0007420753,0.0004430007,0.0005638513,0.0014285273,0.0010254219,0.0008524058,0.0016630699],"category_scores_gemma":[0.0030206507,0.00046786468,0.00032773268,0.00077928323,0.00037179264,0.0018320855,0.0012830079,0.0008803634,0.0003337592],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020945258,0.00018853582,0.0022919527,0.00004992173,0.00004918612,0.00028989263,0.00012537188,0.9182679,0.007983278,0.01007033,0.0014885693,0.058985576],"study_design_scores_gemma":[0.0000144142305,0.000029880424,0.00029296716,0.000002738612,0.000006412015,0.000023982913,0.000050974722,0.99422836,0.0008810571,0.003927381,0.0005330904,0.000008752833],"about_ca_topic_score_codex":0.0025360389,"about_ca_topic_score_gemma":0.0053723007,"teacher_disagreement_score":0.0025360389,"about_ca_system_score_codex":0.0009235747,"about_ca_system_score_gemma":0.00072688673,"threshold_uncertainty_score":0.008239925},"labels":[],"label_agreement":null},{"id":"W2016100278","doi":"10.1109/ccece.2010.5575176","title":"Simulation of a house heating system using C# &amp;#x2014; An energy conservation perspective","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Thermostat; Schedule; Energy conservation; Energy consumption; Heating system; Computer science; Occupancy; Simulation; Consumption (sociology); Energy (signal processing); Automotive engineering; Real-time computing; Engineering; Architectural engineering; Electrical engineering; Mechanical engineering; Operating system","score_opus":0.022070273478861997,"score_gpt":0.24741178903529112,"score_spread":0.22534151555642912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016100278","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48385352,0.00025555003,0.4158002,0.00047759488,0.00021121789,0.00055537536,0.0048459694,0.008908207,0.085092224],"genre_scores_gemma":[0.92752457,0.00018045412,0.057010364,0.00010048374,0.00001528345,0.00038243347,0.001361269,0.00028288073,0.013142341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998343,0.000041155305,0.000007820887,0.000020248262,0.00005773515,0.000038773007],"domain_scores_gemma":[0.99948347,0.00027527937,0.000040459177,0.000045269542,0.00011665535,0.000038769198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033468293,0.0006659638,0.00052125356,0.00033272448,0.00044327762,0.00072094763,0.0014045868,0.00086355885,0.011232257],"category_scores_gemma":[0.0009345467,0.00031953637,0.00044148474,0.00047722863,0.0003915428,0.00044260285,0.0003530555,0.0008370577,0.0007909087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047675334,0.000022745442,0.00046570782,0.000036427416,0.000008686383,0.000041266565,0.000020498925,0.9926583,0.0013988793,0.001438528,0.0006098917,0.0032514422],"study_design_scores_gemma":[0.00001148748,0.000016026332,0.00013370997,0.0000037849584,0.0000036955068,0.000007668354,0.000007723406,0.9975393,0.0012584366,0.0002344151,0.0007794668,0.000004253612],"about_ca_topic_score_codex":0.025681593,"about_ca_topic_score_gemma":0.012200032,"teacher_disagreement_score":0.025681593,"about_ca_system_score_codex":0.00067674846,"about_ca_system_score_gemma":0.0012137926,"threshold_uncertainty_score":0.051064193},"labels":[],"label_agreement":null},{"id":"W2016471396","doi":"10.1109/tsg.2015.2394362","title":"Incentive Design for Voltage Optimization Programs for Industrial Loads","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Incentive; Voltage; Investment (military); Monte Carlo method; Rate of return; Control theory (sociology); Time horizon; Sensitivity (control systems); Energy conservation; Return on investment; Mathematical optimization; Constant (computer programming); Electric power system; Reliability engineering; Engineering; Computer science; Power (physics); Economics; Microeconomics; Finance; Production (economics); Electrical engineering; Control (management); Electronic engineering","score_opus":0.08110053526041441,"score_gpt":0.245532083962322,"score_spread":0.1644315487019076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016471396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02484656,0.00022986192,0.96078587,0.0004059274,0.00004192981,0.00019250296,0.00006552814,0.000111071626,0.01332066],"genre_scores_gemma":[0.84267926,0.000500148,0.14715637,0.00014582604,0.000063490086,0.00044133377,0.000102678074,0.00008493547,0.008826028],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988312,0.0006014044,0.000031769385,0.0001414916,0.00019972019,0.00019436996],"domain_scores_gemma":[0.9976674,0.0016962767,0.00026764986,0.000061933446,0.00018838776,0.000118355296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033785275,0.0010164217,0.0012561758,0.0007756341,0.00048565274,0.0012590914,0.0015920459,0.0013374768,0.005558922],"category_scores_gemma":[0.006548345,0.0007589358,0.0005875315,0.0006289569,0.0011792463,0.0014041067,0.0014671764,0.0015594073,0.00028791057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004288724,0.00007026564,0.00018472287,0.00005096441,0.000010947479,0.000039095186,0.00004211199,0.9480262,0.00033122968,0.041804843,0.00043659503,0.0089600235],"study_design_scores_gemma":[0.00001612667,0.00003002464,0.000045126646,0.000009385967,0.0000031121413,0.0000050295357,0.000009394455,0.989556,0.00009962096,0.009620612,0.00060208235,0.0000034205716],"about_ca_topic_score_codex":0.003371898,"about_ca_topic_score_gemma":0.003919114,"teacher_disagreement_score":0.005558922,"about_ca_system_score_codex":0.0023690816,"about_ca_system_score_gemma":0.0027951794,"threshold_uncertainty_score":0.01859641},"labels":[],"label_agreement":null},{"id":"W2017572490","doi":"10.1109/aina.2014.135","title":"Peak Load Scheduling in Smart Grid Communication Environment","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; University of Alberta","funders":"","keywords":"Smart grid; Computer science; Scheduling (production processes); Limit (mathematics); Power system simulation; Smart meter; Grid; MATLAB; Demand response; Energy consumption; Power (physics); Real-time computing; Embedded system; Electricity; Electrical engineering; Electric power system; Engineering; Operating system","score_opus":0.006126292139452264,"score_gpt":0.17043031482903842,"score_spread":0.16430402268958616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017572490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16460286,0.0005911369,0.80858785,0.00050931034,0.00019010522,0.000103580234,0.00029961317,0.0015289914,0.02358665],"genre_scores_gemma":[0.9846432,0.0001551277,0.011239632,0.00003869444,0.000034203556,0.000034792414,0.00006728714,0.00005316403,0.003733803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996138,0.00009640365,0.000014306894,0.00009767184,0.000083055544,0.00009482437],"domain_scores_gemma":[0.999689,0.00013908799,0.000052243526,0.00002522985,0.00006627102,0.000028288448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003195568,0.00044405306,0.00061846164,0.00020617836,0.0005528081,0.00087280537,0.00073271035,0.00059459615,0.003011056],"category_scores_gemma":[0.00058945623,0.00024014573,0.0003051167,0.00045686017,0.00034352264,0.0010797734,0.0004634035,0.0004832206,0.00039885857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012516537,0.000039929557,0.0006725129,0.000056447287,0.000016513108,0.00024548572,0.00004564419,0.9757908,0.0027705135,0.007254151,0.0014538163,0.011528949],"study_design_scores_gemma":[0.000007713972,0.000019815003,0.00015301521,0.0000016241925,0.000005038311,0.000025178895,0.000017665541,0.99675035,0.00056279445,0.0018480397,0.0006049027,0.0000038209587],"about_ca_topic_score_codex":0.0059579727,"about_ca_topic_score_gemma":0.0044896123,"teacher_disagreement_score":0.0059579727,"about_ca_system_score_codex":0.0007719039,"about_ca_system_score_gemma":0.0008354477,"threshold_uncertainty_score":0.011846542},"labels":[],"label_agreement":null},{"id":"W2018826517","doi":"10.1016/j.enpol.2010.01.027","title":"The effect of utility time-varying pricing and load control strategies on residential summer peak electricity use: A review","year":2010,"lang":"en","type":"review","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":387,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"National Research Council Canada; Natural Resources Canada; University of Waterloo","keywords":"Peak demand; Electricity; Demand response; Electricity pricing; Control (management); Load shifting; Environmental economics; Peak load; Mains electricity; Load management; Economics; Supply and demand; Operations management; Microeconomics; Business; Natural resource economics; Electricity market; Automotive engineering; Engineering; Electrical engineering","score_opus":0.013112223618259942,"score_gpt":0.2783764721903536,"score_spread":0.2652642485720937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018826517","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00026790926,0.99924016,0.00008123051,0.000084868465,0.000036559934,0.000003642179,0.00003727639,0.0000024059243,0.00024588907],"genre_scores_gemma":[0.0019360452,0.9977411,0.00010687825,0.000074589,0.000048768674,0.000004067757,0.000025836755,9.873175e-7,0.000061833096],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960166,0.00008509452,0.00008035632,0.00009254074,0.000114435155,0.000026056226],"domain_scores_gemma":[0.99760145,0.0016574477,0.0003846068,0.000035963512,0.00027998944,0.000040658288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013777792,0.0009790526,0.0028765067,0.001806019,0.00018179628,0.0010367859,0.0012485017,0.0010596309,0.0028831805],"category_scores_gemma":[0.0030246412,0.00038231048,0.0012471913,0.0035380812,0.0003698501,0.0009827979,0.00041863922,0.00077861856,0.00048229104],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036784416,0.0001418367,0.0007656375,0.09612158,0.0012142065,0.00010857371,0.000052055842,0.0013967663,0.00075811514,0.0013924027,0.008617028,0.889064],"study_design_scores_gemma":[0.0004893412,0.0016260153,0.016706012,0.08237161,0.018274024,0.0019636375,0.0004040451,0.0013436443,0.0032548755,0.004435094,0.8689306,0.00020105825],"about_ca_topic_score_codex":0.003872673,"about_ca_topic_score_gemma":0.0061031277,"teacher_disagreement_score":0.003872673,"about_ca_system_score_codex":0.0006622536,"about_ca_system_score_gemma":0.002070202,"threshold_uncertainty_score":0.009645164},"labels":[],"label_agreement":null},{"id":"W2020721549","doi":"10.1109/tdc.2014.6863413","title":"A review on energy management systems","year":2014,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy management; Smart grid; Computer science; Context (archaeology); Reliability (semiconductor); Work (physics); Energy consumption; Energy storage; Reliability engineering; Load management; Energy management system; Demand response; Efficient energy use; Risk analysis (engineering); Environmental economics; Energy (signal processing); Electricity; Engineering; Business; Electrical engineering","score_opus":0.024728273255336757,"score_gpt":0.2536033129553971,"score_spread":0.22887503970006037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2020721549","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00040714932,0.9812572,0.0017713865,0.0008900035,0.0010167852,0.000028759541,0.00011744948,0.000043492633,0.014467801],"genre_scores_gemma":[0.0034280047,0.98790914,0.0018235082,0.00046354343,0.00073792244,0.000026566091,0.00019688442,0.0000112468815,0.0054030647],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947864,0.00008099273,0.00008792081,0.00008528048,0.0002299264,0.000037193982],"domain_scores_gemma":[0.99923015,0.00036537347,0.00008733827,0.00003511024,0.00025376593,0.000028303495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006219359,0.0009717085,0.00095722417,0.0025608903,0.0004807663,0.0017535883,0.0010842502,0.0012797688,0.012726697],"category_scores_gemma":[0.0013005444,0.00034439945,0.00066446094,0.0045272843,0.00039534745,0.002316563,0.0007428072,0.0010710143,0.005251341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034554854,0.000075067794,0.00028303903,0.015360276,0.00006347105,0.0001746429,0.00010464639,0.00090667635,0.0010477935,0.013736304,0.059550773,0.9086628],"study_design_scores_gemma":[0.000003161472,0.00003158963,0.00039505892,0.0027644823,0.000037540634,0.00037622443,0.000050399223,0.00016436153,0.00024067755,0.0024164603,0.9935074,0.000012573002],"about_ca_topic_score_codex":0.0015739767,"about_ca_topic_score_gemma":0.0016948729,"teacher_disagreement_score":0.012726697,"about_ca_system_score_codex":0.0007326817,"about_ca_system_score_gemma":0.0017681799,"threshold_uncertainty_score":0.04257506},"labels":[],"label_agreement":null},{"id":"W2021871536","doi":"10.1016/j.renene.2012.10.013","title":"Integrating renewable energy using a smart distribution system: Potential of self-regulating demand response","year":2012,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Smart grid; Wind power; Automotive engineering; Demand response; Distributed generation; Grid; Engineering; Electrical engineering; Electricity","score_opus":0.0074591040309815535,"score_gpt":0.19440882252413563,"score_spread":0.1869497184931541,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021871536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38482845,0.00073888624,0.54281175,0.0014836207,0.00044839227,0.00013293137,0.00026281783,0.0033592016,0.06593392],"genre_scores_gemma":[0.9845471,0.00013467393,0.0120255845,0.00008441587,0.000058690377,0.000014863002,0.00006125329,0.000037873917,0.0030355752],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998654,0.00004271803,0.0000075689986,0.000028320219,0.000042848475,0.000013085942],"domain_scores_gemma":[0.99969196,0.00009362726,0.000033704688,0.00006427032,0.00009450541,0.00002191671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021588191,0.00035763247,0.0002837067,0.00017532079,0.00019478712,0.00073147024,0.00051557296,0.0003650058,0.0032265717],"category_scores_gemma":[0.00059392717,0.00013309788,0.00018248524,0.0003807652,0.00019316417,0.0007578813,0.00031565232,0.0003109305,0.0005333183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012962933,0.0010193828,0.008869171,0.00027002842,0.00024938607,0.0004421003,0.00016992693,0.34717512,0.14291215,0.03481606,0.0064110924,0.45636934],"study_design_scores_gemma":[0.00016387763,0.0005206183,0.0038080073,0.000033168388,0.0001621483,0.00022017892,0.00011261844,0.91357386,0.03639808,0.02659375,0.018367691,0.000046047768],"about_ca_topic_score_codex":0.0006938954,"about_ca_topic_score_gemma":0.0011603715,"teacher_disagreement_score":0.0032265717,"about_ca_system_score_codex":0.00025372542,"about_ca_system_score_gemma":0.00022358472,"threshold_uncertainty_score":0.010793984},"labels":[],"label_agreement":null},{"id":"W2022898263","doi":"10.1109/tsg.2013.2294055","title":"Optimal Distribution Systems Operation Using Smart Matching Scheme (SMS) for Smart Grid Applications","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Dispatchable generation; Renewable energy; Computer science; Context (archaeology); Matching (statistics); Grid; Reliability engineering; Distributed generation; Electric power system; Distributed computing; Engineering; Power (physics); Electrical engineering","score_opus":0.015133679642777393,"score_gpt":0.22860924353792117,"score_spread":0.21347556389514377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022898263","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27470458,0.00025051617,0.7185108,0.00022535633,0.000048086677,0.000152625,0.000060723283,0.0003920162,0.0056553767],"genre_scores_gemma":[0.9751315,0.000040486026,0.024284018,0.000019505005,0.000007797022,0.000029425657,0.000016420541,0.000005118515,0.00046578268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997986,0.00007335016,0.00001748876,0.000040678995,0.000042331627,0.000027505917],"domain_scores_gemma":[0.9997894,0.00006260556,0.00008043237,0.000021025302,0.00003410268,0.00001244929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035568065,0.00032162844,0.00040067238,0.0001871671,0.00021291416,0.00033547834,0.00034927056,0.00034574943,0.0012225914],"category_scores_gemma":[0.00067911507,0.0001222367,0.00018551298,0.0003457186,0.00024214486,0.0005802781,0.00025911132,0.0001873494,0.00015876893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010163288,0.00025361907,0.002545419,0.00020049186,0.000060814145,0.00013323806,0.0001462409,0.67746764,0.07348609,0.021253403,0.0014945443,0.22194226],"study_design_scores_gemma":[0.00007422077,0.00033646138,0.0006671561,0.0000085444,0.000021064423,0.00005164292,0.000025577707,0.9831231,0.0104823,0.003682282,0.001516914,0.000010740468],"about_ca_topic_score_codex":0.0007037709,"about_ca_topic_score_gemma":0.0010725433,"teacher_disagreement_score":0.0012225914,"about_ca_system_score_codex":0.00031576699,"about_ca_system_score_gemma":0.00030515596,"threshold_uncertainty_score":0.0040899515},"labels":[],"label_agreement":null},{"id":"W2022979892","doi":"10.1109/tste.2014.2319239","title":"Energy Provisioning and Operating Costs in Hybrid Solar-Powered Infrastructure","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Operating expense; Provisioning; Solar power; Computer science; Operating cost; Grid parity; Solar energy; Capital cost; Grid; Scheduling (production processes); Reliability engineering; Photovoltaic system; Automotive engineering; Electrical engineering; Power (physics); Engineering; Photovoltaics; Computer network; Operations management","score_opus":0.0024211013398553766,"score_gpt":0.17493618356518043,"score_spread":0.17251508222532505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022979892","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6926248,0.0013925178,0.28217304,0.00045141118,0.00008273939,0.00017219831,0.00028590436,0.00032517477,0.022492243],"genre_scores_gemma":[0.9860217,0.00020016095,0.011556892,0.00002085757,0.0000095769155,0.000033261043,0.000047282043,0.000032364253,0.002077887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995184,0.0001550528,0.000015149169,0.00007087091,0.000104531864,0.00013601991],"domain_scores_gemma":[0.9988279,0.0007990236,0.00013817276,0.00008227219,0.000090717775,0.00006195655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009350708,0.0008870334,0.0006343836,0.000509799,0.00045838568,0.001709264,0.0008638708,0.0007205523,0.0036043103],"category_scores_gemma":[0.0033315988,0.00056781986,0.000397856,0.0011246374,0.00057794515,0.0021479495,0.00072080607,0.0006999106,0.00017460842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007312312,0.000025650743,0.0004407717,0.000029329121,0.000011065723,0.000034719487,0.0000099977815,0.9878824,0.0005278293,0.0034432942,0.00016776388,0.0073542073],"study_design_scores_gemma":[0.0000070430347,0.000035252073,0.00059607014,0.0000068731615,0.000011623668,0.000024226774,0.000029159039,0.9965391,0.00067150116,0.001828352,0.000245365,0.0000054611114],"about_ca_topic_score_codex":0.006963492,"about_ca_topic_score_gemma":0.008637259,"teacher_disagreement_score":0.006963492,"about_ca_system_score_codex":0.0018831663,"about_ca_system_score_gemma":0.0009964089,"threshold_uncertainty_score":0.013845921},"labels":[],"label_agreement":null},{"id":"W2023682492","doi":"10.1109/ccece.2014.6900912","title":"Grid connected energy storage system to profit from net-metering and variable rate electricity","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Net metering; Electricity; Energy storage; Sizing; Stand-alone power system; Computer science; Metering mode; Profit (economics); Grid; Variable (mathematics); Automotive engineering; Energy consumption; Environmental economics; Distributed generation; Electrical engineering; Renewable energy; Engineering; Economics; Microeconomics; Mathematics","score_opus":0.0042557109874709394,"score_gpt":0.15567533101969996,"score_spread":0.15141962003222903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023682492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9092075,0.0001739734,0.061770905,0.00020680668,0.000052247746,0.00027872014,0.0002842914,0.0012516633,0.026773842],"genre_scores_gemma":[0.99484587,0.000038350325,0.002388388,0.000011367167,0.0000017869024,0.00000979188,0.000041592855,0.000009000131,0.0026538277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998455,0.000036704252,0.000008192302,0.000018322877,0.00006172358,0.000029481504],"domain_scores_gemma":[0.9998363,0.000041763087,0.000015803209,0.000017706654,0.00007590562,0.0000124025655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016767607,0.0002713866,0.00019436525,0.00019891343,0.00040139855,0.0006554458,0.00059307925,0.00021356516,0.004402192],"category_scores_gemma":[0.00036266423,0.000101432226,0.00020091985,0.00031020684,0.00023430733,0.0003979254,0.00025797272,0.00019511876,0.00037518225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017795775,0.0010087782,0.015410804,0.00036924164,0.00021873236,0.0012567381,0.00027925702,0.7078037,0.087272905,0.013230553,0.004649891,0.16671978],"study_design_scores_gemma":[0.00022211828,0.00069352513,0.0066850055,0.000015280917,0.00012825757,0.0002865616,0.00023421335,0.9390786,0.04398952,0.002426855,0.006213729,0.000026237016],"about_ca_topic_score_codex":0.046884116,"about_ca_topic_score_gemma":0.08045117,"teacher_disagreement_score":0.046884116,"about_ca_system_score_codex":0.0013244686,"about_ca_system_score_gemma":0.0011575111,"threshold_uncertainty_score":0.09322244},"labels":[],"label_agreement":null},{"id":"W2023865237","doi":"10.1109/tsg.2014.2302245","title":"Game-Theoretic Demand-Side Management With Storage Devices for the Future Smart Grid","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":235,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Stackelberg competition; Smart grid; Nash equilibrium; Computer science; Game theory; Energy storage; Mathematical optimization; Schedule; Profit (economics); Energy consumption; Uniqueness; Energy management; Demand response; Operations research; Mathematical economics; Energy (signal processing); Electricity; Microeconomics; Economics; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.005398316040496996,"score_gpt":0.1888385152619778,"score_spread":0.1834401992214808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023865237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08319028,0.00046490456,0.9013258,0.0012323492,0.00008945025,0.00014459364,0.000106180036,0.00010247349,0.0133439675],"genre_scores_gemma":[0.93041986,0.00040206264,0.06302767,0.00014999344,0.000055365683,0.00014086053,0.000049402108,0.000031842752,0.005722978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995041,0.00024393041,0.000015692667,0.000055621007,0.000085812215,0.00009485864],"domain_scores_gemma":[0.9990128,0.00069461245,0.0000855533,0.000044063352,0.000082801314,0.000080161684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010541058,0.0007766807,0.0008658123,0.0002340269,0.00047457486,0.0014850058,0.0010064289,0.000985304,0.0028491549],"category_scores_gemma":[0.0022731642,0.00038110442,0.0005992599,0.00044659775,0.0010655305,0.002304475,0.000997427,0.0011755761,0.0002190624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010038322,0.0000815688,0.0003557194,0.000060368322,0.000024779078,0.00014379069,0.00008437957,0.88555807,0.0012635022,0.10394352,0.0013027283,0.007081211],"study_design_scores_gemma":[0.000016023561,0.00002296815,0.00005506616,0.0000030545157,0.0000054213497,0.000018796649,0.000022253664,0.97269946,0.00019833965,0.02648089,0.00047250648,0.0000051697093],"about_ca_topic_score_codex":0.0045938333,"about_ca_topic_score_gemma":0.0051003094,"teacher_disagreement_score":0.0045938333,"about_ca_system_score_codex":0.0015097787,"about_ca_system_score_gemma":0.0014412071,"threshold_uncertainty_score":0.01095432},"labels":[],"label_agreement":null},{"id":"W2024220340","doi":"10.1109/ccece.2014.6901160","title":"Design and implementation of a rule-based learning algorithm using Zigbee wireless sensors for energy management","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; Wireless; Wireless sensor network; Computer science; Energy consumption; Electricity; Energy management; Microcontroller; Energy conservation; Energy (signal processing); Embedded system; Efficient energy use; Real-time computing; Algorithm; Engineering; Computer network; Telecommunications; Electrical engineering","score_opus":0.010647139666911292,"score_gpt":0.2265532376148892,"score_spread":0.2159060979479779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024220340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012361752,0.00012334307,0.98264945,0.00008062965,0.00006678584,0.00019507065,0.000046668156,0.0019150099,0.0025614337],"genre_scores_gemma":[0.31150234,0.00021657691,0.68369377,0.00013089196,0.000033303346,0.00043419912,0.00017195204,0.00006856891,0.0037483762],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996288,0.00003510399,0.00004340729,0.00010841432,0.00015453725,0.000029748104],"domain_scores_gemma":[0.99956113,0.00010421889,0.00004791456,0.00005164205,0.00021349706,0.000021548973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045841341,0.00040269017,0.00051385263,0.00040364833,0.0002876181,0.0008301008,0.0015669664,0.0006744611,0.0019299007],"category_scores_gemma":[0.00096738955,0.00028948084,0.00033189726,0.00035745368,0.0002601594,0.0006646953,0.0002930307,0.0006945232,0.00076134433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022725241,0.0004701152,0.003612587,0.0002755191,0.00016529813,0.0003431138,0.00019022902,0.22120692,0.07407668,0.0073369355,0.003314556,0.6887808],"study_design_scores_gemma":[0.000054107022,0.00016161894,0.00086613436,0.00002110939,0.00003866287,0.0001872038,0.000026862532,0.9582816,0.032588907,0.0012147506,0.0065383743,0.000020718873],"about_ca_topic_score_codex":0.0021909256,"about_ca_topic_score_gemma":0.0020499055,"teacher_disagreement_score":0.0021909256,"about_ca_system_score_codex":0.00029119066,"about_ca_system_score_gemma":0.0008067103,"threshold_uncertainty_score":0.0064561963},"labels":[],"label_agreement":null},{"id":"W2026118018","doi":"10.1109/tetc.2013.2273457","title":"A Game-Theoretical Scheme in the Smart Grid With Demand-Side Management: Towards a Smart Cyber-Physical Power Infrastructure","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Emerging Topics in Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":117,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Stackelberg competition; Smart grid; Electricity; Procurement; Demand response; Profit (economics); Computer science; Grid; Electricity retailing; Game theory; Electricity market; Environmental economics; Business; Microeconomics; Economics; Marketing","score_opus":0.005219531272848779,"score_gpt":0.21408164285604017,"score_spread":0.2088621115831914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026118018","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027501864,0.00017974911,0.9484453,0.0017501232,0.00010332297,0.00031699796,0.00008559022,0.00012368217,0.021493314],"genre_scores_gemma":[0.828696,0.00036251012,0.16183262,0.00039602604,0.00007223383,0.00046002254,0.00005618231,0.000029035798,0.008095451],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99774206,0.0013388449,0.0000637541,0.00027220187,0.00040335895,0.00017980245],"domain_scores_gemma":[0.9988085,0.00062922697,0.00013463205,0.000110107445,0.0001559656,0.00016156539],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021508038,0.0009353488,0.00085070025,0.00039857122,0.001124691,0.0023373722,0.0021533638,0.0022807915,0.003794481],"category_scores_gemma":[0.003335634,0.00042101988,0.0009990865,0.0005916472,0.0030157722,0.0032278618,0.0018381815,0.0018508381,0.00047163854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011491391,0.00010642282,0.00025501306,0.00007564104,0.000036495665,0.000246301,0.000348947,0.29458922,0.0025482674,0.6908932,0.0016285945,0.009156937],"study_design_scores_gemma":[0.00007221054,0.00009407043,0.00006305479,0.00001494022,0.000014801832,0.00006909223,0.000059286256,0.83587915,0.00046779535,0.16035262,0.0028864515,0.000026641852],"about_ca_topic_score_codex":0.004463048,"about_ca_topic_score_gemma":0.0038837257,"teacher_disagreement_score":0.004463048,"about_ca_system_score_codex":0.0023293267,"about_ca_system_score_gemma":0.0025539657,"threshold_uncertainty_score":0.01690048},"labels":[],"label_agreement":null},{"id":"W2026208021","doi":"10.1109/ccece.2012.6334885","title":"Parameter identification of thermal models for domestic electric water heaters in a direct load control program","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Resources Canada","keywords":"Water heater; Thermal; Electric heating; Identification (biology); Temperature control; Water consumption; Power (physics); Water heating; Control (management); Computer science; Electric power; Heating element; Temperature measurement; Environmental science; Automotive engineering; Control engineering; Engineering; Mechanical engineering; Environmental engineering; Meteorology","score_opus":0.010391782445087205,"score_gpt":0.22454325743840362,"score_spread":0.2141514749933164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026208021","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45466912,0.00010397168,0.5380597,0.00017735532,0.000016108555,0.0001257797,0.00013603727,0.0007825926,0.005929354],"genre_scores_gemma":[0.99224335,0.000018921874,0.0065810485,0.0000090243275,0.0000021961914,0.000038491296,0.000045330264,0.000017346278,0.0010441619],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997625,0.000076834694,0.0000093956905,0.000073558855,0.00004651446,0.00003118732],"domain_scores_gemma":[0.9992136,0.0005296736,0.00008549749,0.000060874827,0.000085925894,0.000024402969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005437873,0.00057184877,0.00054007105,0.00024550522,0.0003540188,0.000761213,0.00053624646,0.00054222293,0.0011734349],"category_scores_gemma":[0.0017442453,0.00055087695,0.00034445117,0.00016348466,0.00050077506,0.0007226546,0.0005517937,0.0007541605,0.00020315444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006353864,0.00004063146,0.0010536005,0.000021002112,0.000009657318,0.000024526853,0.000061033687,0.9896813,0.0015053061,0.0005489628,0.000095368225,0.006895034],"study_design_scores_gemma":[0.0000057929756,0.000015588928,0.00022754348,0.0000012057586,0.0000022821437,0.0000027394917,0.000010653155,0.99889934,0.00049932004,0.00023562356,0.00009748045,0.000002359019],"about_ca_topic_score_codex":0.015480615,"about_ca_topic_score_gemma":0.012148675,"teacher_disagreement_score":0.015480615,"about_ca_system_score_codex":0.0006911103,"about_ca_system_score_gemma":0.00073774875,"threshold_uncertainty_score":0.03078103},"labels":[],"label_agreement":null},{"id":"W2028400261","doi":"10.1109/icsai.2014.7009284","title":"Implementation of a virtual power plant: The integrated load management system","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Siemens (Canada)","funders":"","keywords":"Virtual power plant; Siemens; Load management; Demand response; Computer science; Distributed generation; Energy management; Management system; Power management; Electricity generation; Systems engineering; Embedded system; Energy management system; Electric power system; Power (physics); Operating system; Energy (signal processing); Engineering; Electrical engineering; Renewable energy; Electricity; Operations management","score_opus":0.003727049590816393,"score_gpt":0.184953268756461,"score_spread":0.1812262191656446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028400261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33774966,0.00009665109,0.5715695,0.00084242754,0.00019534616,0.0005217116,0.00026765515,0.012498349,0.0762587],"genre_scores_gemma":[0.9391465,0.00003489037,0.053636942,0.000079294754,0.0000264197,0.0000838696,0.00016739077,0.00009291614,0.006731716],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993998,0.00018198673,0.000025836453,0.000109306704,0.00020903502,0.00007401748],"domain_scores_gemma":[0.9994168,0.000104510465,0.000060192146,0.0001605234,0.00017392957,0.00008406233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005140706,0.00027869444,0.00021113557,0.00025927392,0.00030024917,0.0011753035,0.0009368869,0.0004032464,0.004210773],"category_scores_gemma":[0.00080691633,0.00017418838,0.00014428931,0.00020253149,0.00039172854,0.0010923981,0.0009169434,0.0006973363,0.0008615218],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007925552,0.0013369326,0.015558654,0.00033517383,0.000118114534,0.0009432659,0.001354104,0.15100123,0.10479681,0.08926968,0.01172673,0.62276673],"study_design_scores_gemma":[0.0005021638,0.0028421285,0.018938007,0.00013460974,0.00011366247,0.00093289785,0.0006234284,0.65602374,0.11003242,0.019050827,0.19062959,0.00017666887],"about_ca_topic_score_codex":0.0012102673,"about_ca_topic_score_gemma":0.0011580714,"teacher_disagreement_score":0.004210773,"about_ca_system_score_codex":0.00056726165,"about_ca_system_score_gemma":0.0011058385,"threshold_uncertainty_score":0.014086425},"labels":[],"label_agreement":null},{"id":"W2028464759","doi":"10.1016/j.apenergy.2012.10.054","title":"Hierarchical market integration of responsive loads as spinning reserve","year":2012,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Virtual power plant; Flexibility (engineering); Market integration; Electric power system; Demand response; Spinning; Grid; Vertical integration; Population; Distributed generation; Environmental economics; Power (physics); Electricity; Industrial organization; Engineering; Business; Economics; Renewable energy; Microeconomics; Mechanical engineering; Electrical engineering","score_opus":0.010571747694277626,"score_gpt":0.2194636593016767,"score_spread":0.20889191160739906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028464759","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23978627,0.0004157468,0.69744354,0.00061773474,0.0002098406,0.00019167399,0.00032981596,0.0018016598,0.059203796],"genre_scores_gemma":[0.9773193,0.000068677,0.017296107,0.00004977691,0.00004278991,0.00003226245,0.00006739653,0.00006458305,0.005059163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994954,0.00015969451,0.000021844382,0.000090172085,0.00012277385,0.00011014366],"domain_scores_gemma":[0.99938285,0.00020144274,0.00007786912,0.00012067854,0.00014226514,0.00007482453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000869121,0.00043039687,0.00085121556,0.00038985076,0.0004521096,0.0017293633,0.0012189628,0.00064975885,0.009632966],"category_scores_gemma":[0.0017621004,0.00037915856,0.0005061226,0.0006244447,0.0005258572,0.002034149,0.0008433974,0.0007425737,0.0010455826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075155206,0.0003963265,0.0010693017,0.00012297391,0.00011471079,0.00034945618,0.00017082032,0.65692264,0.021841748,0.22436896,0.0055468665,0.088344574],"study_design_scores_gemma":[0.000026414877,0.00007472985,0.00032844467,0.0000046566724,0.000020047697,0.000028145854,0.000025544497,0.9669417,0.0013049833,0.030093811,0.0011402258,0.000011374633],"about_ca_topic_score_codex":0.0017562807,"about_ca_topic_score_gemma":0.0037229164,"teacher_disagreement_score":0.009632966,"about_ca_system_score_codex":0.0007161375,"about_ca_system_score_gemma":0.0007522617,"threshold_uncertainty_score":0.03222549},"labels":[],"label_agreement":null},{"id":"W2028725268","doi":"10.1109/tsg.2013.2289922","title":"Peak Load Curtailment in a Smart Grid Via Fuzzy System Approach","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Load management; Demand response; Load balancing (electrical power); Fuzzy logic; Computer science; Electric power system; Grid; Load profile; Energy management; Duty cycle; Peak demand; Reliability engineering; Fuzzy control system; Energy consumption; Power (physics); Base load power plant; Energy (signal processing); Engineering; Electricity; Voltage; Electrical engineering; Mathematics","score_opus":0.008354657079227008,"score_gpt":0.1840282279579185,"score_spread":0.1756735708786915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028725268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04878074,0.00022567742,0.94369304,0.00019129794,0.00003287471,0.00007680412,0.00005076873,0.0002170828,0.0067317868],"genre_scores_gemma":[0.9431712,0.0001791947,0.054235958,0.000044463868,0.000024776846,0.0000740802,0.000029471734,0.000011499898,0.0022295164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997222,0.00007896017,0.000014715387,0.000053638076,0.0000939667,0.000036605066],"domain_scores_gemma":[0.999808,0.0000886663,0.000028697526,0.000009518707,0.00005424706,0.000010923759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055062684,0.00040362772,0.0005583357,0.0005597747,0.0005098165,0.0009641622,0.0005103547,0.0005937079,0.0018433619],"category_scores_gemma":[0.0005936476,0.00019447035,0.0005462205,0.00042843446,0.0004592805,0.00057575223,0.00040978284,0.00046698697,0.00015151767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080064536,0.000040117087,0.0007089054,0.00007107708,0.000050270522,0.00014263399,0.00013202726,0.94635737,0.004120591,0.016526317,0.00047856363,0.031292047],"study_design_scores_gemma":[0.0000065671165,0.000023818944,0.00011213849,0.000004668286,0.000008431556,0.000008615813,0.000016674132,0.99585235,0.00036948544,0.003299011,0.00029346865,0.0000046789696],"about_ca_topic_score_codex":0.011749506,"about_ca_topic_score_gemma":0.011865113,"teacher_disagreement_score":0.011749506,"about_ca_system_score_codex":0.001089511,"about_ca_system_score_gemma":0.00084265834,"threshold_uncertainty_score":0.02336222},"labels":[],"label_agreement":null},{"id":"W2029996148","doi":"10.1109/sege.2013.6707914","title":"A survey on cost saving methods for smart grids","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Computer science; Profit (economics); Grid; Power grid; Environmental economics; Power (physics); Engineering; Economics","score_opus":0.03872871043532773,"score_gpt":0.3023298301063073,"score_spread":0.2636011196709796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029996148","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005449028,0.5351642,0.3848683,0.002772044,0.0013656617,0.00022130125,0.00045055,0.0005543662,0.06915459],"genre_scores_gemma":[0.07352933,0.6959954,0.20522842,0.00092031725,0.0021756368,0.00031467553,0.00080218463,0.0003035735,0.02073049],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99867225,0.00033326264,0.00011999972,0.00014835196,0.0006609421,0.00006523158],"domain_scores_gemma":[0.9980038,0.0013505042,0.000091293674,0.00018147985,0.00034412165,0.00002896213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00132334,0.0014371312,0.0014029378,0.00294185,0.0004736161,0.0021854069,0.0014436604,0.0012817387,0.009849414],"category_scores_gemma":[0.0035261416,0.00064318645,0.0011328727,0.0075449985,0.00056688057,0.0034260987,0.0006782529,0.0011643643,0.00288258],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008616896,0.00012549279,0.00058190426,0.004215367,0.00006473266,0.000098085904,0.00007167419,0.01760667,0.0012081186,0.088476025,0.020912195,0.8665535],"study_design_scores_gemma":[0.000044716995,0.00028080476,0.0022442387,0.0029309655,0.00014311621,0.0015229521,0.00021805265,0.07996368,0.0043432084,0.1391805,0.76901346,0.00011422021],"about_ca_topic_score_codex":0.001285358,"about_ca_topic_score_gemma":0.0010230454,"teacher_disagreement_score":0.009849414,"about_ca_system_score_codex":0.0010220279,"about_ca_system_score_gemma":0.00083473703,"threshold_uncertainty_score":0.032949507},"labels":[],"label_agreement":null},{"id":"W2030343799","doi":"10.1109/tsg.2011.2177103","title":"A Water-Filling Based Scheduling Algorithm for the Smart Grid","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Scheduling (production processes); Smart grid; Grid; Distributed computing; Computation; Demand response; Power consumption; Fair-share scheduling; Real-time computing; Electricity; Mathematical optimization; Computer network; Power (physics); Algorithm; Engineering; Quality of service","score_opus":0.018780063193263707,"score_gpt":0.22064305393423642,"score_spread":0.20186299074097272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030343799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009235885,0.00010057201,0.98836017,0.00014036446,0.000042170144,0.00005520992,0.000052468382,0.0005120046,0.0015011706],"genre_scores_gemma":[0.25907043,0.0001599924,0.7364521,0.00009510876,0.000043701297,0.00019241008,0.00022480305,0.00015550654,0.0036058817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997702,0.000053814707,0.00001348853,0.000058582064,0.00006200707,0.00004189627],"domain_scores_gemma":[0.99973136,0.00012528083,0.00002539338,0.000032363452,0.00006165594,0.000023925022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006220802,0.0005291762,0.0007145563,0.0005119057,0.00077261624,0.00066609704,0.0010443601,0.000727758,0.0034385677],"category_scores_gemma":[0.0015160519,0.00034960287,0.00038114926,0.0008942458,0.00056250265,0.0011367887,0.0006834392,0.00065537775,0.0004971957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017259338,0.00007498834,0.00039072,0.000073622,0.000023918255,0.00004692149,0.00010686328,0.784468,0.0036602018,0.032948934,0.004699541,0.17333373],"study_design_scores_gemma":[0.000020830885,0.000012120897,0.00002486392,0.000002105772,0.0000020742127,0.000006017379,0.000007633611,0.99225205,0.00039903598,0.0061798217,0.0010903695,0.0000030856554],"about_ca_topic_score_codex":0.0073757786,"about_ca_topic_score_gemma":0.008984482,"teacher_disagreement_score":0.0073757786,"about_ca_system_score_codex":0.0011394607,"about_ca_system_score_gemma":0.0021003075,"threshold_uncertainty_score":0.014665663},"labels":[],"label_agreement":null},{"id":"W2030568301","doi":"10.1109/tdc.2012.6281718","title":"Demand response in the New Zealand Electricity market","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Incentive; Demand management; Deferral; Load management; Electricity market; Business; Demand reduction; Peak demand; Smart meter; Economics; Electricity; Environmental economics; Industrial organization; Microeconomics; Finance; Engineering","score_opus":0.007080765292675246,"score_gpt":0.19923941449476412,"score_spread":0.1921586492020889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030568301","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29529375,0.001878242,0.020508036,0.032608934,0.00071712927,0.00058669713,0.00046865255,0.00042955787,0.647509],"genre_scores_gemma":[0.95237875,0.0010930321,0.0034129594,0.0024164813,0.00019041658,0.0001200403,0.00015695838,0.000057271438,0.04017416],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99818027,0.0004567363,0.000054998713,0.00018474665,0.00078303716,0.00034021126],"domain_scores_gemma":[0.99803513,0.0005205257,0.00031547883,0.00013999207,0.0006943775,0.00029446834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00263039,0.00030996354,0.00036407672,0.00041436867,0.0011412868,0.003778528,0.0011941355,0.0014165565,0.015107468],"category_scores_gemma":[0.0071008652,0.00017606963,0.00067436916,0.0005026442,0.0018212975,0.0033857215,0.0019768472,0.0019296509,0.0009525987],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013563427,0.0008995254,0.014278194,0.0006025471,0.00007162281,0.004168737,0.0049860715,0.021814635,0.014090124,0.65875155,0.080711186,0.19826949],"study_design_scores_gemma":[0.0012160445,0.0010502847,0.04606994,0.00031535584,0.00009005426,0.0016072989,0.007114625,0.06726833,0.0054542026,0.09428125,0.77514756,0.00038501373],"about_ca_topic_score_codex":0.09191815,"about_ca_topic_score_gemma":0.056190036,"teacher_disagreement_score":0.09191815,"about_ca_system_score_codex":0.005650414,"about_ca_system_score_gemma":0.0038788714,"threshold_uncertainty_score":0.18276626},"labels":[],"label_agreement":null},{"id":"W2030592030","doi":"10.1109/epec.2013.6802971","title":"Optimizing wireless performance of current metering and consumption control in commercial buildings","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algonquin College","funders":"","keywords":"Metering mode; Transformer; Electrical engineering; Wireless; Current transformer; Engineering; Automotive engineering; Electronic circuit; AC power; Computer science; Telecommunications; Voltage; Mechanical engineering","score_opus":0.014385384522551751,"score_gpt":0.21383081156425676,"score_spread":0.199445427041705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030592030","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82891566,0.0007219357,0.15742847,0.00025701942,0.000037147944,0.000051172676,0.000101355625,0.001165429,0.011321896],"genre_scores_gemma":[0.9952514,0.00007559963,0.004106757,0.0000140332495,0.0000061456703,0.000005919394,0.000025842452,0.000022748385,0.0004915899],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965286,0.00007448083,0.000019457595,0.00006412535,0.00011402159,0.00007506542],"domain_scores_gemma":[0.9994856,0.00021981791,0.00006806214,0.0000533768,0.00015152479,0.000021603148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036822454,0.00039541553,0.00026037355,0.00018247063,0.00017251942,0.00062113436,0.00041071814,0.00025377623,0.0014331833],"category_scores_gemma":[0.0014166435,0.00011089242,0.0000671487,0.00038681494,0.00018835675,0.00066178886,0.00024433483,0.00016030336,0.00048851094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012785044,0.00043384038,0.014488428,0.00026888712,0.00006492682,0.00020484338,0.0001804438,0.28568125,0.42050284,0.0035537188,0.0020218166,0.2713205],"study_design_scores_gemma":[0.000071714414,0.0010812032,0.0089452835,0.000020345744,0.000074536634,0.00024408236,0.00017787107,0.5982669,0.38562527,0.0011455162,0.0043241717,0.000023180524],"about_ca_topic_score_codex":0.00092136255,"about_ca_topic_score_gemma":0.0009089399,"teacher_disagreement_score":0.0014331833,"about_ca_system_score_codex":0.00039272048,"about_ca_system_score_gemma":0.00020166031,"threshold_uncertainty_score":0.004794538},"labels":[],"label_agreement":null},{"id":"W2031385568","doi":"10.1109/acssc.2013.6810593","title":"Real-time energy storage management with renewable energy of arbitrary generation dynamics","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Renewable energy; Energy storage; Energy management; Relaxation (psychology); Optimization problem; Online algorithm; Optimal control; Energy (signal processing); Control (management); Control theory (sociology); Algorithm; Lyapunov equation; Lyapunov exponent; Mathematics; Engineering; Power (physics); Electrical engineering","score_opus":0.003923115883117833,"score_gpt":0.15337480888757332,"score_spread":0.1494516930044555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031385568","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0484306,0.0002335839,0.9460876,0.0005109272,0.00006894856,0.000054300428,0.00004059524,0.00029102384,0.004282427],"genre_scores_gemma":[0.980095,0.000110470915,0.018386763,0.000046256326,0.000020157811,0.000034433877,0.000015254359,0.000014524721,0.0012771094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996785,0.00007921723,0.000019819821,0.00007738866,0.00009533613,0.000049795668],"domain_scores_gemma":[0.9995437,0.00019458821,0.00011129837,0.00005131557,0.00007407003,0.000024940471],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055258715,0.0004472745,0.00044625494,0.00016837653,0.00029030858,0.00072411704,0.00089217984,0.00044855886,0.0016574811],"category_scores_gemma":[0.0015770595,0.00021398056,0.00029770375,0.00033489836,0.00059473014,0.0011212175,0.00065847335,0.000657575,0.00018489172],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014402076,0.00007495178,0.0004281073,0.00008854484,0.000022952188,0.000109951456,0.00006597933,0.9207595,0.009213756,0.036327474,0.00077607244,0.031988684],"study_design_scores_gemma":[0.000009128032,0.000029002656,0.000059706163,0.000002745158,0.0000038134854,0.000012151243,0.0000068762442,0.9943568,0.0017200229,0.003506836,0.00028827594,0.0000045566376],"about_ca_topic_score_codex":0.0016743038,"about_ca_topic_score_gemma":0.0020909011,"teacher_disagreement_score":0.0016743038,"about_ca_system_score_codex":0.00062622194,"about_ca_system_score_gemma":0.0009175849,"threshold_uncertainty_score":0.0055448413},"labels":[],"label_agreement":null},{"id":"W2034853345","doi":"10.1109/isgteurope.2010.5638892","title":"Wireless network performance for residential demand-side participation","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Latency (audio); Computer science; Network packet; Computer network; Wireless network; Wireless; Wireless sensor network; Energy consumption; Real-time computing; Telecommunications; Engineering","score_opus":0.008718947740970037,"score_gpt":0.21758416540521736,"score_spread":0.20886521766424732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034853345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98024493,0.00016082167,0.014347845,0.00022117053,0.00001622382,0.000026969434,0.00019396134,0.00020225956,0.0045856587],"genre_scores_gemma":[0.9990663,0.000032753633,0.00047286696,0.000008471362,0.000002334691,0.00000879197,0.000068120775,0.000010460216,0.00032984922],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929047,0.00018694319,0.000031035524,0.00010282244,0.00021449728,0.00017415901],"domain_scores_gemma":[0.9961547,0.0021996025,0.0004364768,0.00030514234,0.0007681827,0.00013584897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012065236,0.00029238244,0.00028011348,0.0003375154,0.00036737113,0.0005959021,0.0004956767,0.00049338554,0.0026569143],"category_scores_gemma":[0.008533206,0.000108959444,0.00014234768,0.00077792996,0.0003406891,0.0011768349,0.00054705236,0.0003313696,0.00040807502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00088034687,0.00027258403,0.03220849,0.0001392454,0.000059347884,0.00043974567,0.00024469674,0.91123646,0.016813118,0.0055253864,0.0012579379,0.030922567],"study_design_scores_gemma":[0.000019155977,0.0004119868,0.014174816,0.000009351284,0.000025311465,0.00033838308,0.0003243902,0.96999913,0.011007358,0.002811331,0.0008545749,0.000024153356],"about_ca_topic_score_codex":0.0029588507,"about_ca_topic_score_gemma":0.0020294683,"teacher_disagreement_score":0.0029588507,"about_ca_system_score_codex":0.00079934817,"about_ca_system_score_gemma":0.0004715675,"threshold_uncertainty_score":0.008888245},"labels":[],"label_agreement":null},{"id":"W2036145503","doi":"10.1109/ccece.2013.6567686","title":"The cognitive power meter: Looking beyond the smart meter","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University; British Columbia Institute of Technology","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart meter; Automatic meter reading; Metre; Electricity meter; Computer science; Smart grid; Key (lock); Electrical engineering; Power (physics); Real-time computing; Telecommunications; Engineering; Computer security; Wireless","score_opus":0.004397420001912264,"score_gpt":0.17647056317112314,"score_spread":0.17207314316921088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036145503","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012339289,0.06539888,0.17842513,0.45871514,0.008023329,0.00013349706,0.00019433112,0.00093118066,0.27583927],"genre_scores_gemma":[0.5326073,0.1119627,0.15648226,0.10024207,0.011104009,0.0003503215,0.0003684832,0.0006078338,0.086275],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9959777,0.0015332436,0.00015321288,0.00039227476,0.0016319331,0.00031164856],"domain_scores_gemma":[0.9908268,0.0038821534,0.0003867987,0.0008966551,0.0032967608,0.0007108552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005089104,0.0006829375,0.00068684656,0.0010569919,0.0022991563,0.009443696,0.002183756,0.0055855187,0.0070751053],"category_scores_gemma":[0.011118452,0.00038895852,0.0006151766,0.0017146514,0.0075091706,0.02983844,0.0046445546,0.009060709,0.0023237206],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005936175,0.000047364156,0.0010839971,0.000437841,0.000017111548,0.00032975967,0.0019329423,0.0014307165,0.0011243356,0.8143241,0.04868403,0.13052845],"study_design_scores_gemma":[0.000009602188,0.000051270283,0.0006067557,0.0004980999,0.00001648322,0.00044777567,0.0029887604,0.0025650684,0.001041868,0.353231,0.6384934,0.00004977895],"about_ca_topic_score_codex":0.0057029566,"about_ca_topic_score_gemma":0.00590294,"teacher_disagreement_score":0.009443696,"about_ca_system_score_codex":0.003703,"about_ca_system_score_gemma":0.0050859936,"threshold_uncertainty_score":0.02691406},"labels":[],"label_agreement":null},{"id":"W2038217105","doi":"10.1109/jec-ecc.2012.6186973","title":"Supply and load management for the smart distribution grid using wireless networks","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Scalability; Computer science; Load balancing (electrical power); Wireless; Grid; Load management; Energy management; Resilience (materials science); Distributed computing; Computer network; Telecommunications; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.010975546486525876,"score_gpt":0.20272365521662963,"score_spread":0.19174810873010376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038217105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07771715,0.0006602949,0.9097905,0.000793769,0.00012154502,0.0000777802,0.00005811363,0.0009311812,0.0098496415],"genre_scores_gemma":[0.9543102,0.0005153542,0.039868083,0.00009279512,0.000108080785,0.000060621176,0.00006371381,0.000035003166,0.004946219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985945,0.000035597535,0.000008684041,0.000032284148,0.00004645584,0.000017448976],"domain_scores_gemma":[0.99988544,0.000033560445,0.000029555591,0.000018688146,0.000025028212,0.000007762019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021724656,0.00033209793,0.00021822791,0.00020506086,0.00050816353,0.0005912142,0.00042433635,0.00023337515,0.0015892],"category_scores_gemma":[0.00035867695,0.00009906209,0.00012640284,0.00037731457,0.00029163965,0.0012572124,0.0005054537,0.00022470648,0.00032287237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021697159,0.00014028023,0.0032931152,0.00023222696,0.00005401537,0.00036833144,0.00021526986,0.43062356,0.050610173,0.07915545,0.012257444,0.42283323],"study_design_scores_gemma":[0.00002480117,0.00006659639,0.0006349529,0.0000109765015,0.000022182872,0.00010132304,0.00007319744,0.96276456,0.007211519,0.013366201,0.015709115,0.000014570736],"about_ca_topic_score_codex":0.0012832786,"about_ca_topic_score_gemma":0.0024302248,"teacher_disagreement_score":0.0015892,"about_ca_system_score_codex":0.0005106367,"about_ca_system_score_gemma":0.0003103157,"threshold_uncertainty_score":0.0053164363},"labels":[],"label_agreement":null},{"id":"W2039408570","doi":"10.1109/smartgridcomm.2014.7007628","title":"An analysis of energy storage and regulation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Operator (biology); Unit (ring theory); Service (business); Computer science; Range (aeronautics); Power (physics); State (computer science); Balance (ability); Energy storage; Variable (mathematics); Operations research; Reliability engineering; Mathematical optimization; Control theory (sociology); Economics; Control (management); Engineering; Mathematics; Physics","score_opus":0.0038596464833832345,"score_gpt":0.17709336714363283,"score_spread":0.17323372066024958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039408570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17133264,0.00454158,0.6096748,0.008640938,0.0002551217,0.00017533354,0.000648719,0.00050372764,0.20422715],"genre_scores_gemma":[0.9647596,0.0014428968,0.010445439,0.00022702798,0.00011438678,0.00007949862,0.000076920915,0.00009780717,0.022756368],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888176,0.00033252928,0.000031438336,0.00019281326,0.00024207459,0.00031934012],"domain_scores_gemma":[0.9955842,0.002936029,0.0005333835,0.0002770207,0.00039405448,0.00027544852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019145428,0.00071513944,0.0009117281,0.0007412494,0.0009688128,0.0027930522,0.0015452087,0.001929066,0.015935386],"category_scores_gemma":[0.008823544,0.0005255097,0.0010474025,0.00093239074,0.0026987046,0.004711421,0.0016716779,0.0019743755,0.0007368518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104767074,0.000038722137,0.0006463804,0.0000815145,0.000027669505,0.00021467602,0.00011398384,0.362355,0.0017023887,0.6251986,0.0017183722,0.0077979406],"study_design_scores_gemma":[0.000023496246,0.0000733801,0.0007462535,0.00006589622,0.00002907751,0.0001324131,0.000119052806,0.79902834,0.0008040761,0.19453418,0.0044103516,0.000033424883],"about_ca_topic_score_codex":0.007313,"about_ca_topic_score_gemma":0.0034545017,"teacher_disagreement_score":0.015935386,"about_ca_system_score_codex":0.0035271908,"about_ca_system_score_gemma":0.0022966603,"threshold_uncertainty_score":0.053309202},"labels":[],"label_agreement":null},{"id":"W2039532980","doi":"10.1109/smartgridcomm.2014.7007632","title":"Real-time energy storage management: Finite-time horizon approach","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Time horizon; Optimization problem; Control (management); Renewable energy; Optimal control; Energy management; Dynamic programming; Control theory (sociology); Energy (signal processing); Engineering; Algorithm; Lyapunov equation; Mathematics","score_opus":0.0044288162935944885,"score_gpt":0.16216006935556646,"score_spread":0.15773125306197197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039532980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0057150233,0.00026052067,0.9913462,0.00015851276,0.00003480732,0.0000187469,0.000013954064,0.00015972811,0.0022925274],"genre_scores_gemma":[0.8781879,0.00044905208,0.11858211,0.00011652363,0.000050564435,0.00008388537,0.000037214788,0.000041317537,0.0024515295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997627,0.00005753639,0.000014196345,0.000046410256,0.00008931422,0.000029845018],"domain_scores_gemma":[0.9996948,0.00015113218,0.00004996469,0.000025081259,0.00006129805,0.00001785022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044126576,0.00046075345,0.00058862503,0.000231754,0.0002795916,0.0007207017,0.00092846184,0.0005822556,0.002112024],"category_scores_gemma":[0.0008442803,0.0002263286,0.00038454018,0.00030650423,0.0004955478,0.000894282,0.00047697828,0.0007639887,0.00018393183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052496787,0.000037502814,0.0001707983,0.000089240784,0.000020871386,0.000057461246,0.000052453102,0.917388,0.0038945465,0.02991779,0.0007141957,0.047604624],"study_design_scores_gemma":[0.000003662196,0.000013674809,0.000020675223,0.0000032638166,0.0000024174908,0.000008221667,0.0000026233906,0.996431,0.0006266701,0.0025791933,0.00030544272,0.0000031901143],"about_ca_topic_score_codex":0.0023499506,"about_ca_topic_score_gemma":0.0022796905,"teacher_disagreement_score":0.0023499506,"about_ca_system_score_codex":0.0006781203,"about_ca_system_score_gemma":0.0009268483,"threshold_uncertainty_score":0.007065475},"labels":[],"label_agreement":null},{"id":"W2039856804","doi":"10.1109/tsg.2012.2212032","title":"Optimal Operation of Residential Energy Hubs in Smart Grids","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":494,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Linear programming; Mathematical optimization; Stove; Energy consumption; Electricity; Mathematical model; Demand response; Integer programming; Smart grid; Energy management; Energy storage; Energy (signal processing); Simulation; Engineering; Power (physics); Mathematics","score_opus":0.010843966917627222,"score_gpt":0.21099518582657284,"score_spread":0.2001512189089456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039856804","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13696489,0.00045330878,0.8420659,0.0003601565,0.000056144458,0.0001136179,0.0002815865,0.00064989453,0.019054504],"genre_scores_gemma":[0.9705411,0.00028144396,0.024899384,0.000027178236,0.000009052905,0.00005377756,0.000075226235,0.000039336137,0.0040735663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972755,0.00010636157,0.000007875923,0.000053244956,0.00005106142,0.00005394143],"domain_scores_gemma":[0.9997981,0.000090338086,0.000046888465,0.000015757516,0.000030449744,0.000018630179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053677964,0.00066755206,0.0007438854,0.00037021947,0.0004983886,0.0011303175,0.0005692095,0.00062848354,0.002870342],"category_scores_gemma":[0.0008707262,0.00055772776,0.0004205353,0.00048396672,0.0007267718,0.0014508615,0.0005448862,0.0004903752,0.00031496843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000323899,0.000008863245,0.00015635398,0.000015063464,0.0000044598273,0.000023973613,0.000014518132,0.98947173,0.00040162477,0.0066934046,0.00026075618,0.002916864],"study_design_scores_gemma":[0.000006666926,0.000012695186,0.00004920088,0.000002541993,0.0000028520546,0.000004047372,0.000016666068,0.9967253,0.00023531576,0.0026173766,0.0003247977,0.0000025442582],"about_ca_topic_score_codex":0.010040986,"about_ca_topic_score_gemma":0.013344101,"teacher_disagreement_score":0.010040986,"about_ca_system_score_codex":0.0016784302,"about_ca_system_score_gemma":0.0011413025,"threshold_uncertainty_score":0.019965112},"labels":[],"label_agreement":null},{"id":"W2041493998","doi":"10.1145/2465529.2465744","title":"Firming solar power","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Solar irradiance; Solar power; Computer science; Revenue; Power (physics); Electricity generation; Reliability (semiconductor); Environmental science; Reliability engineering; Meteorology; Engineering; Business; Finance; Physics","score_opus":0.003495756771021482,"score_gpt":0.15110082988917262,"score_spread":0.14760507311815113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041493998","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24507052,0.00041444364,0.70237863,0.0012136,0.00029549925,0.0001106953,0.00045736358,0.0012201703,0.048839033],"genre_scores_gemma":[0.9696106,0.00013126936,0.02209706,0.00008388406,0.00003738673,0.000022995808,0.00013721756,0.000089301015,0.007790415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99954706,0.00007218097,0.000016305301,0.00015247085,0.00012421992,0.00008767454],"domain_scores_gemma":[0.9991924,0.00035067907,0.000099211444,0.00019212694,0.0000927271,0.00007289515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052512815,0.0005608879,0.00070991763,0.00033813025,0.0005231273,0.002120983,0.0014864525,0.0009045584,0.007584818],"category_scores_gemma":[0.0027073324,0.0003441817,0.0005718992,0.00064923894,0.00046362355,0.002678326,0.00116167,0.00093987765,0.00087389664],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013881177,0.00012079306,0.0029570663,0.000085273176,0.000048674934,0.00032498906,0.00013604308,0.7947244,0.012167824,0.086987294,0.0039632553,0.098345585],"study_design_scores_gemma":[0.000014037249,0.00005639666,0.0006774958,0.000009519724,0.000013830881,0.000094799194,0.00009211143,0.9589153,0.004865386,0.030008463,0.005234066,0.000018597646],"about_ca_topic_score_codex":0.0044820867,"about_ca_topic_score_gemma":0.006920853,"teacher_disagreement_score":0.007584818,"about_ca_system_score_codex":0.0012721919,"about_ca_system_score_gemma":0.0009366072,"threshold_uncertainty_score":0.025373697},"labels":[],"label_agreement":null},{"id":"W2041818989","doi":"10.1109/tsg.2013.2284760","title":"A Novel Current Sensor for Home Energy Use Monitoring","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electrical conductor; Electrical engineering; Current sensor; Electronic engineering; Conductor; Wireless sensor network; Tracking (education); Calibration; Power (physics); Engineering; Energy (signal processing); Magnetic field; Current (fluid); Computer science; Real-time computing; Materials science; Physics","score_opus":0.027601887702382175,"score_gpt":0.227784334507067,"score_spread":0.20018244680468483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041818989","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04627364,0.004332946,0.9266921,0.00073841296,0.0010917387,0.0002843192,0.00034068976,0.005293566,0.014952584],"genre_scores_gemma":[0.57752365,0.0022857178,0.40262145,0.0008748179,0.0005815202,0.00028350658,0.00040252652,0.00014999161,0.015276795],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994287,0.00006415207,0.000021451477,0.000137644,0.00032193775,0.000026177484],"domain_scores_gemma":[0.99968064,0.00004970762,0.000046734076,0.00003543463,0.00016263519,0.000024910203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023451405,0.0006214722,0.0006958373,0.00067686645,0.0003134311,0.00067138404,0.0012350343,0.0008771532,0.001971131],"category_scores_gemma":[0.00058599917,0.00021424862,0.00024824688,0.0005544136,0.0003004914,0.0014682359,0.00044540624,0.00061015424,0.0014066282],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029856703,0.0001931639,0.002017433,0.00042925111,0.00004990198,0.00043762548,0.00013573642,0.0026455736,0.6867036,0.0063704294,0.008406417,0.2923123],"study_design_scores_gemma":[0.000117072064,0.0013329864,0.0041921725,0.000105233965,0.00013577398,0.0041169245,0.00012063051,0.15504555,0.7030528,0.002446546,0.12919587,0.00013845388],"about_ca_topic_score_codex":0.00020116063,"about_ca_topic_score_gemma":0.00029631934,"teacher_disagreement_score":0.001971131,"about_ca_system_score_codex":0.0003967168,"about_ca_system_score_gemma":0.0002581762,"threshold_uncertainty_score":0.006594062},"labels":[],"label_agreement":null},{"id":"W2042101093","doi":"10.1109/jsac.2014.2332112","title":"Direct Electricity Trading in Smart Grid: A Coalitional Game Analysis","year":2014,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":200,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Alexander von Humboldt-Stiftung","keywords":"Shapley value; Electricity; Computer science; Smart grid; Revenue; Electricity pricing; Electricity market; Electricity retailing; Dynamic pricing; Electricity generation; Game theory; Mathematical optimization; Grid; Microeconomics; Environmental economics; Power (physics); Business; Economics; Finance; Mathematics; Electrical engineering","score_opus":0.019832332288050432,"score_gpt":0.2504470573568902,"score_spread":0.2306147250688398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042101093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.104106314,0.0006330258,0.8681089,0.0007312043,0.0001017957,0.00016286201,0.00013021147,0.00008338113,0.025942337],"genre_scores_gemma":[0.96259,0.0005232993,0.031065403,0.00011224682,0.000046336976,0.00015013725,0.00006906757,0.000028483855,0.005415041],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902415,0.00048043783,0.000032768592,0.00011691363,0.00019753285,0.00014819295],"domain_scores_gemma":[0.9983273,0.0010794819,0.00017594796,0.00006150685,0.00021215118,0.00014361001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015489676,0.00093346316,0.0010866962,0.0006219637,0.00070289883,0.0015278653,0.0013434092,0.0011508617,0.002805099],"category_scores_gemma":[0.0036115563,0.0003966181,0.0011226203,0.00070471654,0.0015748424,0.0022684992,0.0015078835,0.0014598527,0.00021234284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006983203,0.00006832192,0.0008920547,0.0000647499,0.00005652058,0.00030460386,0.00014102367,0.8245003,0.0010042011,0.1650259,0.0009914711,0.006880943],"study_design_scores_gemma":[0.0000071884806,0.000012403937,0.00007936714,0.0000043614355,0.0000059888353,0.000019871004,0.000026050613,0.9810982,0.000056963563,0.018415945,0.0002680325,0.000005638903],"about_ca_topic_score_codex":0.0068453364,"about_ca_topic_score_gemma":0.004841314,"teacher_disagreement_score":0.0068453364,"about_ca_system_score_codex":0.0016999041,"about_ca_system_score_gemma":0.0016191122,"threshold_uncertainty_score":0.013610959},"labels":[],"label_agreement":null},{"id":"W2043125187","doi":"10.1109/epec.2013.6802939","title":"Microgrid level competitive market using dynamic matching","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Microgrid; Incentive; Matching (statistics); Industrial organization; Tariff; Market penetration; Business; Computer science; Microeconomics; Control (management); Economics; Marketing; International trade","score_opus":0.012129932843337733,"score_gpt":0.20218134115671732,"score_spread":0.19005140831337958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043125187","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08478359,0.00017465791,0.86354166,0.000835434,0.00010398542,0.00039629109,0.00016671266,0.000546338,0.049451347],"genre_scores_gemma":[0.9143246,0.00018443952,0.07276999,0.00015849025,0.0000652697,0.0003127122,0.000091005655,0.00006769916,0.01202582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981775,0.0008055217,0.00006998744,0.00031640494,0.0003804228,0.0002501661],"domain_scores_gemma":[0.9980001,0.00084368576,0.00035264585,0.00034100522,0.00021685856,0.00024568447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023741268,0.00058448943,0.0009939815,0.0007503619,0.0010644139,0.002863626,0.002394101,0.0018934392,0.01117605],"category_scores_gemma":[0.005453755,0.00042616765,0.00093218207,0.001155995,0.0014841168,0.0041576116,0.003528324,0.001139452,0.00096198573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034748527,0.00025285396,0.0006527545,0.00012919167,0.00007599431,0.00030397635,0.00018260711,0.22306624,0.0053732926,0.71921575,0.0038094702,0.046590477],"study_design_scores_gemma":[0.00009922526,0.00017176155,0.00019194363,0.000017145623,0.000024096955,0.00017153108,0.000078217156,0.76907134,0.0014206897,0.22180802,0.006910076,0.00003603622],"about_ca_topic_score_codex":0.00091701414,"about_ca_topic_score_gemma":0.0006367004,"teacher_disagreement_score":0.01117605,"about_ca_system_score_codex":0.0016976254,"about_ca_system_score_gemma":0.0014018627,"threshold_uncertainty_score":0.03738761},"labels":[],"label_agreement":null},{"id":"W2045362395","doi":"10.1109/tsg.2012.2203341","title":"Advanced Demand Side Management for the Future Smart Grid Using Mechanism Design","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":815,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Demand response; Smart meter; Energy consumption; Electricity; Payment; Load management; Dynamic pricing; Economics; Microeconomics; Engineering","score_opus":0.020968726258033914,"score_gpt":0.22838121257083024,"score_spread":0.20741248631279632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045362395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009191299,0.00054026087,0.98577046,0.00069819635,0.000084376275,0.0001490119,0.000028308048,0.00022498924,0.0033130152],"genre_scores_gemma":[0.7682827,0.0012940447,0.22444361,0.0005316156,0.00021084707,0.00064824184,0.00006752696,0.000057402816,0.00446399],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979448,0.0010694551,0.000105687395,0.00027734778,0.00041954816,0.00018322234],"domain_scores_gemma":[0.9979917,0.0009942804,0.00027355802,0.00033296915,0.00028955302,0.000117943106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052100183,0.0006810727,0.00087840477,0.0006078268,0.00057727954,0.0026494106,0.002546919,0.0020073766,0.003929731],"category_scores_gemma":[0.0043554474,0.0004800686,0.0010216209,0.000864511,0.0012696631,0.0036621043,0.0015244458,0.0016655227,0.00048603228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016433591,0.00022727894,0.00066104584,0.00029860897,0.00013363232,0.00030141027,0.00019779187,0.31407282,0.007077244,0.5844432,0.0038158847,0.08860679],"study_design_scores_gemma":[0.00010728771,0.000110603476,0.00011442097,0.00004039633,0.000040599367,0.00019340965,0.00004297982,0.81720996,0.001276253,0.17449778,0.0063314764,0.00003482066],"about_ca_topic_score_codex":0.00085189956,"about_ca_topic_score_gemma":0.0007489371,"teacher_disagreement_score":0.0052100183,"about_ca_system_score_codex":0.0016546572,"about_ca_system_score_gemma":0.0022225184,"threshold_uncertainty_score":0.027553499},"labels":[],"label_agreement":null},{"id":"W2045593775","doi":"10.1080/10485230309509643","title":"End-user Electric Demand Management Should be a National Policy Objective","year":2003,"lang":"en","type":"article","venue":"Strategic Planning for Energy and the Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Legislation; Energy policy; Pace; Energy management; Energy supply; Business; Economics; Politics; Energy (signal processing); Public economics; Environmental economics; Political science; Engineering","score_opus":0.017496655740558538,"score_gpt":0.21949840352308464,"score_spread":0.2020017477825261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045593775","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076276776,0.0025460615,0.021909919,0.5582424,0.0038708013,0.00014055854,0.00039718926,0.00066456315,0.40460083],"genre_scores_gemma":[0.36591017,0.004721523,0.026547179,0.29078805,0.0029970424,0.00033835587,0.00079320616,0.00023610146,0.30766827],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99571675,0.001304431,0.00029273302,0.0004492245,0.0016753579,0.00056158635],"domain_scores_gemma":[0.98573685,0.0035931063,0.00077026145,0.00092117256,0.007575166,0.0014033424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008180768,0.000373516,0.0003499625,0.0005883875,0.0018665174,0.01014844,0.0015049808,0.0076407166,0.019806597],"category_scores_gemma":[0.01183205,0.0002818204,0.000331846,0.0006679708,0.0017759714,0.0077191982,0.0022087933,0.004816303,0.004844341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000755089,0.00032442942,0.0020504084,0.0002540802,0.000017426275,0.0001453684,0.00032656683,0.003547807,0.0015138276,0.49762106,0.4252837,0.06883985],"study_design_scores_gemma":[0.000021433956,0.000060846094,0.0021587093,0.00047167053,0.000013782182,0.00016183173,0.0012555039,0.002990483,0.0014311965,0.084679,0.9067107,0.000044787164],"about_ca_topic_score_codex":0.004699951,"about_ca_topic_score_gemma":0.0051138774,"teacher_disagreement_score":0.019806597,"about_ca_system_score_codex":0.0035833078,"about_ca_system_score_gemma":0.014617942,"threshold_uncertainty_score":0.06625968},"labels":[],"label_agreement":null},{"id":"W2045976629","doi":"10.1109/wcsp.2011.6096965","title":"Energy efficient communication networks design for demand response in smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Smart grid; Computer science; Demand response; Computer network; Wireless; Distributed computing; Telecommunications network; Network packet; Energy consumption; Communications system; Power control; Packet loss; Power (physics); Telecommunications; Engineering; Electricity; Electrical engineering","score_opus":0.02725963643846009,"score_gpt":0.20278419172887088,"score_spread":0.17552455529041078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045976629","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008906249,0.0007960371,0.9795268,0.00047580327,0.000094770716,0.00007397734,0.000034347322,0.00014376937,0.0099482145],"genre_scores_gemma":[0.7440426,0.0026168174,0.23749281,0.00030467735,0.000217746,0.00047408126,0.00012159783,0.000104911895,0.014624793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960595,0.00015947154,0.000015168351,0.000058801234,0.00013244757,0.000028327779],"domain_scores_gemma":[0.9996542,0.00010718576,0.000050417853,0.000032059546,0.00014535338,0.00001083643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004508385,0.00042160565,0.0003225967,0.00029835443,0.00039496773,0.000861556,0.0006421522,0.00073289155,0.002232694],"category_scores_gemma":[0.0010827946,0.00027414842,0.00018590766,0.00041703,0.00033568824,0.00098203,0.0003902633,0.0005365586,0.00052724493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006888769,0.000048272355,0.00031646932,0.00022121811,0.00002644229,0.00012688208,0.00012860136,0.7039198,0.015793417,0.18783563,0.0043142973,0.08720009],"study_design_scores_gemma":[0.000011961216,0.00005170146,0.00009722884,0.000022897815,0.000013852286,0.00006183737,0.000033729455,0.9608795,0.0028412696,0.024899159,0.011077736,0.000009216725],"about_ca_topic_score_codex":0.0012911125,"about_ca_topic_score_gemma":0.002385452,"teacher_disagreement_score":0.002232694,"about_ca_system_score_codex":0.00096656545,"about_ca_system_score_gemma":0.00064456626,"threshold_uncertainty_score":0.0074691176},"labels":[],"label_agreement":null},{"id":"W2048156068","doi":"10.1109/pesgm.2014.6938942","title":"Multi-objective pricing game among interconnected smart microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Renewable energy; Computer science; Plug-in; Context (archaeology); Game theory; Wind power; Production (economics); Electric power system; Distributed computing; Power (physics); Engineering; Microeconomics; Economics; Electrical engineering","score_opus":0.006217499468941525,"score_gpt":0.18701781186532498,"score_spread":0.18080031239638347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048156068","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36739454,0.00041588454,0.5994615,0.001834503,0.00010388648,0.000289813,0.00043178632,0.0001769052,0.029891219],"genre_scores_gemma":[0.98633194,0.00012426557,0.009500978,0.0000725758,0.000014879571,0.000112072135,0.000047963913,0.0000123693,0.0037829673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990145,0.0005807914,0.0000309253,0.0001222232,0.00012495506,0.0001265532],"domain_scores_gemma":[0.998659,0.00085388747,0.00013237122,0.000051996343,0.00010530691,0.00019738892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013225803,0.000908901,0.0011991679,0.00037019915,0.0005947644,0.0015908919,0.0015273519,0.0015173308,0.0032109485],"category_scores_gemma":[0.0032041718,0.00049157144,0.0006315934,0.0006017634,0.0011550174,0.0020895735,0.0011776546,0.0011630456,0.00022621448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013809683,0.00007346897,0.00048080433,0.000055277815,0.000044634293,0.00042368198,0.0000959498,0.90466434,0.0011482429,0.08790787,0.0008768402,0.0040907986],"study_design_scores_gemma":[0.00002650247,0.000030206076,0.000096176234,0.0000038070623,0.0000074404575,0.000026530135,0.000032514705,0.9835096,0.00009184993,0.015858779,0.0003093972,0.000007177411],"about_ca_topic_score_codex":0.003649139,"about_ca_topic_score_gemma":0.0027840368,"teacher_disagreement_score":0.003649139,"about_ca_system_score_codex":0.0016578024,"about_ca_system_score_gemma":0.0011462987,"threshold_uncertainty_score":0.012028217},"labels":[],"label_agreement":null},{"id":"W2048470735","doi":"10.1109/smartgridcomm.2011.6102349","title":"Optimal energy consumption scheduling using mechanism design for the future smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Payment; Incentive; Mechanism design; Incentive compatibility; Energy consumption; Demand response; Electricity; Electricity pricing; End user; Operations research; Microeconomics; Electricity market; Economics","score_opus":0.05442491240263533,"score_gpt":0.22106240486121706,"score_spread":0.16663749245858173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048470735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028531166,0.0009155938,0.9644935,0.0010505752,0.00014199743,0.0002690106,0.000059059257,0.00027040057,0.0042686267],"genre_scores_gemma":[0.8618575,0.00090332644,0.13228366,0.00031246108,0.00011358651,0.000598582,0.00006968938,0.000057697383,0.003803496],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99697936,0.0019133266,0.00012535474,0.0003415673,0.00033639034,0.00030409466],"domain_scores_gemma":[0.99679726,0.0019533127,0.00043692792,0.00028234383,0.00029768684,0.0002324919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007386134,0.0008478852,0.0015074621,0.00090242387,0.0006734527,0.0027416341,0.002316598,0.0019642024,0.003007155],"category_scores_gemma":[0.0070450976,0.00081980746,0.0009293611,0.0011395187,0.0015497722,0.0031963321,0.0013223409,0.0016050274,0.00033820313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019426897,0.00013644538,0.00041583722,0.0001649252,0.00009340686,0.00013206225,0.00011813951,0.7931861,0.0014660751,0.17912129,0.0016549145,0.02331652],"study_design_scores_gemma":[0.00009862863,0.000058802314,0.000063693034,0.000013381812,0.000019741006,0.000049925675,0.000029473122,0.9310336,0.00031835312,0.0668551,0.0014426517,0.000016558215],"about_ca_topic_score_codex":0.0016663253,"about_ca_topic_score_gemma":0.0014169747,"teacher_disagreement_score":0.007386134,"about_ca_system_score_codex":0.0024506804,"about_ca_system_score_gemma":0.0035208229,"threshold_uncertainty_score":0.039062083},"labels":[],"label_agreement":null},{"id":"W2049010637","doi":"10.1109/tsg.2014.2372674","title":"Smart Distribution System Operations With Price-Responsive and Controllable Loads","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Ontario Power Authority","keywords":"Controllability; Load management; Demand response; Smart grid; Load profile; Scheduling (production processes); Load regulation; Minification; Computer science; Mathematical optimization; Engineering; Electrical engineering; Electricity; Voltage; Mathematics","score_opus":0.0042611609479103925,"score_gpt":0.17002828145077756,"score_spread":0.16576712050286715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049010637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14476344,0.00009815606,0.83421326,0.00028644534,0.000050560775,0.000115405666,0.00030197628,0.0004928901,0.01967795],"genre_scores_gemma":[0.9886596,0.00008727859,0.0078267455,0.000026659445,0.00001945802,0.00006443817,0.00006366771,0.00003707784,0.0032149842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995049,0.000149128,0.000016948392,0.00010576948,0.00015141547,0.00007186938],"domain_scores_gemma":[0.99957746,0.00019482356,0.0001087794,0.000045246605,0.000053402888,0.000020296453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046417964,0.00073511066,0.0005679492,0.00021118185,0.0003434863,0.0009154187,0.00091860315,0.0007863037,0.003051114],"category_scores_gemma":[0.0010314564,0.00035921676,0.00052908546,0.00031094058,0.0007374205,0.0018059355,0.0004685281,0.00092686334,0.00031690637],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004497837,0.000026801421,0.00034248547,0.00001680041,0.000008760389,0.00007072226,0.000034825276,0.98241913,0.0016037602,0.012902076,0.0002375719,0.0022920982],"study_design_scores_gemma":[0.0000058987994,0.000013299768,0.00008200946,6.7871684e-7,0.0000022216566,0.0000051405073,0.000006187315,0.9983461,0.00011865763,0.0012615226,0.00015637197,0.0000019297504],"about_ca_topic_score_codex":0.008813449,"about_ca_topic_score_gemma":0.0065309806,"teacher_disagreement_score":0.008813449,"about_ca_system_score_codex":0.0011594782,"about_ca_system_score_gemma":0.0007371777,"threshold_uncertainty_score":0.017524302},"labels":[],"label_agreement":null},{"id":"W2050007090","doi":"10.1109/smartgridcomm.2012.6485967","title":"Demand response through a temperature setpoint market in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Setpoint; Thermostat; Setback; Demand response; Incentive; Population; Air conditioning; Environmental science; Economics; Computer science; Electrical engineering; Engineering; Electricity; Microeconomics; Demography","score_opus":0.008866205010178036,"score_gpt":0.19061652950899896,"score_spread":0.18175032449882092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050007090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95132446,0.000066792716,0.001242297,0.0014294075,0.000014917347,0.00011337189,0.0005596383,0.00006270162,0.04518631],"genre_scores_gemma":[0.99226767,0.00004080631,0.00036778697,0.00003943536,0.0000035421692,0.00001506208,0.00014838277,0.000006105017,0.007111212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994779,0.00009922314,0.000012392021,0.000050315404,0.0001358262,0.0002243549],"domain_scores_gemma":[0.9990671,0.00023907314,0.000098139644,0.00005177923,0.00030095043,0.0002429654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050535274,0.00015166959,0.00024052705,0.00019526912,0.0016712905,0.0011036057,0.000785307,0.0005303141,0.0068792184],"category_scores_gemma":[0.0021093485,0.00016318547,0.00021706808,0.00064912724,0.00069454534,0.0006197805,0.0004914665,0.00030446405,0.00033703522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007722043,0.00217931,0.2785656,0.00044973526,0.00022823163,0.0061438046,0.012755113,0.2828111,0.03363833,0.14377558,0.11824389,0.11348727],"study_design_scores_gemma":[0.0014523047,0.0007447585,0.18895587,0.000044890294,0.00009042078,0.00037491848,0.016499918,0.670494,0.004765495,0.020162746,0.096208505,0.00020626133],"about_ca_topic_score_codex":0.88179576,"about_ca_topic_score_gemma":0.9426013,"teacher_disagreement_score":0.118204236,"about_ca_system_score_codex":0.0142541425,"about_ca_system_score_gemma":0.00870333,"threshold_uncertainty_score":0.23780066},"labels":[],"label_agreement":null},{"id":"W2050071282","doi":"10.1109/tsg.2014.2373271","title":"Optimal Operation of Industrial Energy Hubs in Smart Grids","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":137,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Scheduling (production processes); Energy management; Demand response; Operator (biology); Load management; Energy management system; Computer science; Industrial production; Process (computing); Engineering; Mathematical optimization; Operations research; Industrial engineering; Electricity; Energy (signal processing); Electrical engineering; Operations management","score_opus":0.014886280474892998,"score_gpt":0.20006112449893168,"score_spread":0.1851748440240387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050071282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14687665,0.00023461475,0.83913535,0.00030876964,0.00003163517,0.00008695521,0.00019229641,0.0004635906,0.012670104],"genre_scores_gemma":[0.9739163,0.00012826241,0.023323085,0.00002901254,0.0000070823057,0.00004489378,0.000074583346,0.000031975822,0.0024447371],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975187,0.00008309459,0.00000667714,0.00005269748,0.000052757823,0.000052863736],"domain_scores_gemma":[0.99987483,0.000047583104,0.000032163865,0.000012959363,0.00001819546,0.000014232071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004162853,0.00054520986,0.000635408,0.00027579218,0.00035584293,0.00075802434,0.00051443436,0.0006058291,0.0017413194],"category_scores_gemma":[0.0006150259,0.00039912423,0.00036001863,0.0003189663,0.000619696,0.0010957641,0.0005400517,0.00046923314,0.00019662123],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018897905,0.0000068653585,0.00013438087,0.000006405831,0.0000026356429,0.0000136306935,0.000008691863,0.99335665,0.00030970076,0.0039103744,0.00013979491,0.002091943],"study_design_scores_gemma":[0.000005506685,0.000008975962,0.00004715693,0.0000011453205,0.0000013496925,0.0000020145255,0.000008607215,0.99746346,0.000141415,0.0021376389,0.0001813958,0.0000013840668],"about_ca_topic_score_codex":0.0077005825,"about_ca_topic_score_gemma":0.008973098,"teacher_disagreement_score":0.0077005825,"about_ca_system_score_codex":0.0013220916,"about_ca_system_score_gemma":0.0010656741,"threshold_uncertainty_score":0.015311539},"labels":[],"label_agreement":null},{"id":"W2050495423","doi":"10.1109/smartgrid.2010.5622077","title":"Optimal Real-Time Pricing Algorithm Based on Utility Maximization for Smart Grid","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1030,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Smart meter; Computer science; Energy consumption; Demand response; Distributed generation; Real-time computing; Distributed computing; Computer network; Electricity; Power (physics); Engineering","score_opus":0.006798743199524722,"score_gpt":0.2005144152834165,"score_spread":0.19371567208389176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050495423","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025147578,0.00021419558,0.97100294,0.00034273724,0.00003813949,0.000061655854,0.000023891334,0.00028185727,0.0028870124],"genre_scores_gemma":[0.8044138,0.00018563699,0.19259578,0.000141671,0.000049259183,0.00014416725,0.000072736155,0.000076313976,0.002320656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990121,0.00050979666,0.00003384728,0.0001369521,0.0001672987,0.00013991733],"domain_scores_gemma":[0.99890304,0.00071763323,0.00011086897,0.00007178912,0.00013645599,0.00006022113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016460622,0.0007002244,0.0014614452,0.00044808723,0.00044570863,0.0010883999,0.0013411606,0.0010084708,0.0020737168],"category_scores_gemma":[0.0036242984,0.00038869865,0.00033609028,0.0007577828,0.00082474935,0.0015700294,0.0008776941,0.0009784768,0.00032891397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011995344,0.00008350549,0.00030948303,0.000031177427,0.000023630124,0.000046048168,0.00006024026,0.94195926,0.000803251,0.024913287,0.0011934212,0.030456604],"study_design_scores_gemma":[0.000013424293,0.000008814199,0.000016935846,9.2139436e-7,0.0000016746401,0.000005205116,0.0000038921735,0.9953999,0.000098573946,0.0043201055,0.00012894456,0.000001659005],"about_ca_topic_score_codex":0.0024702568,"about_ca_topic_score_gemma":0.0022760027,"teacher_disagreement_score":0.0024702568,"about_ca_system_score_codex":0.0013485652,"about_ca_system_score_gemma":0.0013597771,"threshold_uncertainty_score":0.009784579},"labels":[],"label_agreement":null},{"id":"W2052911113","doi":"10.1109/cdc.2014.7040146","title":"Distributed model predictive control of thermostatically controlled appliances for providing balancing service","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; Simon Fraser University","funders":"","keywords":"Model predictive control; Scheme (mathematics); Smart grid; Computer science; Controller (irrigation); Distributed computing; Grid; Control (management); Service model; Service (business); Distributed generation; Power (physics); Control theory (sociology); Engineering; Mathematics","score_opus":0.00665462875346874,"score_gpt":0.19533271545321207,"score_spread":0.18867808669974334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052911113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0675838,0.00050300703,0.91767216,0.00028459332,0.00017132897,0.000056347842,0.00007381032,0.00096582004,0.012689122],"genre_scores_gemma":[0.9863516,0.000109512424,0.011930813,0.000024442004,0.00002493635,0.000030687388,0.000030793897,0.000012980395,0.0014841532],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998586,0.000028420567,0.000005007065,0.000035702968,0.00005654811,0.000015714093],"domain_scores_gemma":[0.9998528,0.00005551236,0.000026520984,0.000023475079,0.000033088123,0.000008475411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023057815,0.00046754393,0.00041433645,0.00015080017,0.00028649822,0.0006021851,0.00059627823,0.0002516475,0.001517239],"category_scores_gemma":[0.00045182288,0.00016806312,0.0002602229,0.00025560692,0.00033800697,0.00037603785,0.00032513659,0.0005979178,0.00021564182],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011474135,0.00008659174,0.00032407694,0.00007795796,0.000021476684,0.00006334945,0.000044645254,0.9360168,0.014074362,0.0064363265,0.0011165822,0.041623123],"study_design_scores_gemma":[0.000011223152,0.000026929285,0.00007792516,0.0000020015973,0.0000046241457,0.0000057376456,0.000002747599,0.9968016,0.001491579,0.00109353,0.00047964405,0.0000023990117],"about_ca_topic_score_codex":0.0023915763,"about_ca_topic_score_gemma":0.004391773,"teacher_disagreement_score":0.0023915763,"about_ca_system_score_codex":0.00031544775,"about_ca_system_score_gemma":0.0003477812,"threshold_uncertainty_score":0.0050756335},"labels":[],"label_agreement":null},{"id":"W2052933755","doi":"10.1007/s12667-012-0060-2","title":"Wind integration in self-regulating electric load distributions","year":2012,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Dispatchable generation; Wind power; Flexibility (engineering); Demand response; Computer science; Electrical load; Grid; Load shifting; Electric power system; Control engineering; Automotive engineering; Distributed generation; Renewable energy; Engineering; Power (physics); Electricity; Electrical engineering","score_opus":0.006490661063226309,"score_gpt":0.18682636388578316,"score_spread":0.18033570282255684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052933755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55391514,0.00051283,0.42208222,0.0002982768,0.0001347337,0.000040126484,0.00004561907,0.00035321058,0.022617927],"genre_scores_gemma":[0.9960975,0.000052394465,0.0026429202,0.000009284182,0.000008756369,0.00000312557,0.000006945631,0.000011254375,0.0011677665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989915,0.000036280377,0.000005275017,0.000017127899,0.000028704027,0.000013439972],"domain_scores_gemma":[0.99981135,0.00008325199,0.000027167487,0.000017482978,0.00004990051,0.000010795859],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002807343,0.00021535109,0.00028421133,0.00015676636,0.00025501323,0.0005827839,0.0002946252,0.0002763088,0.001379448],"category_scores_gemma":[0.0008267593,0.00022256633,0.00017090554,0.00028058578,0.00023101697,0.0006600394,0.00023192933,0.00033783025,0.00013447886],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049155066,0.00013857963,0.0044281096,0.000051276667,0.000068478876,0.00035208228,0.00009909376,0.87318283,0.013588067,0.03299972,0.0008873873,0.073712856],"study_design_scores_gemma":[0.00001534769,0.00005167299,0.0012877578,0.0000054519674,0.000020685475,0.00004054556,0.000021584594,0.9915611,0.0020430067,0.004385143,0.0005629878,0.0000046860737],"about_ca_topic_score_codex":0.0016967771,"about_ca_topic_score_gemma":0.0047566597,"teacher_disagreement_score":0.0016967771,"about_ca_system_score_codex":0.00030268644,"about_ca_system_score_gemma":0.00015733812,"threshold_uncertainty_score":0.0046147704},"labels":[],"label_agreement":null},{"id":"W2053813838","doi":"10.4236/sgre.2011.23028","title":"Energy Consumption Control of an Air Conditioner Using Web Services","year":2011,"lang":"en","type":"article","venue":"Smart Grid and Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Air conditioning; Smart grid; Energy consumption; Control (management); Thermal comfort; Energy management; Grid; Architectural engineering; Automotive engineering; Information and Communications Technology; Consumption (sociology); Engineering; Energy (signal processing); Telecommunications; Computer science; Electrical engineering; World Wide Web","score_opus":0.011833178274336808,"score_gpt":0.18618184935921983,"score_spread":0.17434867108488303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053813838","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5342439,0.0005629205,0.40068144,0.00057126855,0.00022384511,0.00030099656,0.00033744582,0.023067681,0.040010408],"genre_scores_gemma":[0.9870711,0.000052139636,0.0070369286,0.00005849094,0.000014278238,0.000033857898,0.00006812066,0.00008936444,0.005575773],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99976426,0.0000384041,0.000013071173,0.0000445997,0.00010245842,0.000037151003],"domain_scores_gemma":[0.99977094,0.00005656721,0.000018022813,0.000033262837,0.00009946428,0.00002169515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020376107,0.00034707785,0.00033920995,0.0002818502,0.00036336796,0.00079896254,0.00054063706,0.00039043187,0.004549613],"category_scores_gemma":[0.00044245817,0.00012640646,0.0001985587,0.00022505621,0.00016287224,0.0004938949,0.00020784207,0.00030716677,0.0009204838],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0042647067,0.0018384343,0.010626247,0.0004072741,0.00018547394,0.00108379,0.00051093264,0.17750667,0.31095818,0.011121186,0.017803174,0.46369404],"study_design_scores_gemma":[0.00015649655,0.00022228267,0.0031308464,0.000010293157,0.000057850968,0.00018557788,0.000048983264,0.8815771,0.10563432,0.0014127537,0.0075353906,0.000028073062],"about_ca_topic_score_codex":0.004870197,"about_ca_topic_score_gemma":0.004516908,"teacher_disagreement_score":0.004870197,"about_ca_system_score_codex":0.00031847073,"about_ca_system_score_gemma":0.00031873042,"threshold_uncertainty_score":0.015219986},"labels":[],"label_agreement":null},{"id":"W2053879174","doi":"10.1115/power2011-55200","title":"The Value of Demand Response (DR) to Mitigate Wind Integration Costs in a Smart Grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory","keywords":"Demand response; Variable renewable energy; Wind power; Electric power system; Grid; Environmental economics; Virtual power plant; Smart grid; Renewable energy; Base load power plant; Business; Computer science; Electricity; Distributed generation; Electrical engineering; Engineering; Power (physics); Economics","score_opus":0.012211329237950876,"score_gpt":0.20497665421942407,"score_spread":0.1927653249814732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053879174","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19175822,0.009886145,0.23948579,0.02914891,0.0008377104,0.00028722212,0.000250114,0.00023900895,0.5281069],"genre_scores_gemma":[0.97398293,0.0036092638,0.014763663,0.00051187165,0.0002868105,0.00006410028,0.000033550114,0.000030517469,0.00671729],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998689,0.0006878228,0.000032162327,0.00010444631,0.0003684717,0.000118185795],"domain_scores_gemma":[0.99833363,0.00094207766,0.00023952793,0.00012220503,0.00023719973,0.00012540263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015544936,0.0006316963,0.0003092722,0.00064408814,0.0007908726,0.0040286477,0.0011141213,0.0018666347,0.004812529],"category_scores_gemma":[0.003373047,0.00029928202,0.00039928444,0.0010323102,0.0020937438,0.006132989,0.0019720017,0.0015723244,0.000345639],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007660051,0.000082780054,0.0015385647,0.00016800147,0.000024128674,0.0002855265,0.0002540877,0.047827628,0.0007346938,0.88230765,0.0032071916,0.06349309],"study_design_scores_gemma":[0.00006859273,0.0004149552,0.0050125257,0.0008473667,0.00008968235,0.00053901033,0.0029773298,0.18404314,0.0018375099,0.69387925,0.11016305,0.00012758082],"about_ca_topic_score_codex":0.0016072983,"about_ca_topic_score_gemma":0.0020781048,"teacher_disagreement_score":0.004812529,"about_ca_system_score_codex":0.0018994305,"about_ca_system_score_gemma":0.0013435264,"threshold_uncertainty_score":0.016099572},"labels":[],"label_agreement":null},{"id":"W2054226561","doi":"10.1016/j.rser.2012.06.027","title":"Assessing the economic value of renewable distributed generation in the Northeastern American market","year":2012,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; HEC Montréal","funders":"","keywords":"Renewable energy; Wind power; Environmental economics; Greenhouse gas; Carbon tax; Electricity; Subsidy; Economics; Natural resource economics; Electricity generation; Engineering","score_opus":0.014980561801331161,"score_gpt":0.24363819848098178,"score_spread":0.2286576366796506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054226561","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9473007,0.00903565,0.0008744207,0.0015265505,0.000044787696,0.000014222637,0.00022159987,0.000007057556,0.04097491],"genre_scores_gemma":[0.99541855,0.0026292833,0.00020380471,0.0000558484,0.00004007152,0.0000035336882,0.00008339508,0.0000019676002,0.0015635252],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99964046,0.00014642128,0.000010474506,0.000021191132,0.00015127767,0.0000302194],"domain_scores_gemma":[0.998461,0.0008893635,0.00024391417,0.0000315014,0.000327516,0.000046728102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001172832,0.00024344749,0.00018346487,0.0010074265,0.00028570092,0.0019307267,0.00035349268,0.00056890387,0.0015023106],"category_scores_gemma":[0.0032546746,0.00008032664,0.00021203754,0.001623913,0.00033487155,0.0013862362,0.00032500082,0.00034968436,0.00009635412],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015522314,0.00071729155,0.3649159,0.0007451045,0.0005645137,0.0018254217,0.00074497337,0.15801528,0.0061707273,0.112666495,0.012395619,0.33968645],"study_design_scores_gemma":[0.00009822362,0.00080601877,0.6995395,0.00050149806,0.0007082043,0.00040621887,0.0056539294,0.18039522,0.00560566,0.043464728,0.06268007,0.00014078798],"about_ca_topic_score_codex":0.013659033,"about_ca_topic_score_gemma":0.032004856,"teacher_disagreement_score":0.013659033,"about_ca_system_score_codex":0.0021168352,"about_ca_system_score_gemma":0.0006631747,"threshold_uncertainty_score":0.027159035},"labels":[],"label_agreement":null},{"id":"W2055728138","doi":"10.1177/0037549712470732","title":"Real-time pricing program in a smart grid environment","year":2013,"lang":"en","type":"article","venue":"SIMULATION","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Smart grid; Computer science; Grid; Reliability (semiconductor); Realization (probability); Electric power system; Smart meter; Reliability engineering; Real-time computing; Embedded system; Simulation; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.0065075805067344806,"score_gpt":0.20297160991703653,"score_spread":0.19646402941030205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055728138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92663705,0.000026758345,0.06514735,0.00008806433,0.000022308703,0.000084915795,0.0001933374,0.0008768048,0.0069234082],"genre_scores_gemma":[0.98757195,0.000021975096,0.011224515,0.000009516446,0.0000018771816,0.000041131498,0.00008241514,0.000024756277,0.0010218677],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996625,0.00015346066,0.000010314417,0.000037475824,0.00008951588,0.000046713223],"domain_scores_gemma":[0.9993556,0.00035122954,0.00007442298,0.00009565463,0.00009020644,0.00003291774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047589082,0.00020327186,0.00021025084,0.00021464529,0.00015263846,0.00032264745,0.00034295148,0.00025351555,0.001910345],"category_scores_gemma":[0.0013934585,0.000131523,0.00016354171,0.0003204415,0.00028583387,0.00060553325,0.0002018292,0.00028771276,0.00019405285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026632243,0.00021086492,0.0055279103,0.00003293387,0.000019570034,0.00011473036,0.00010576403,0.9636275,0.004996359,0.0060659843,0.0006839644,0.018348116],"study_design_scores_gemma":[0.00005220783,0.00017920916,0.001868988,0.0000021338417,0.000009918408,0.000019700989,0.000036903864,0.9906183,0.0049394704,0.0012997298,0.0009658491,0.000007524085],"about_ca_topic_score_codex":0.0040365667,"about_ca_topic_score_gemma":0.0027854843,"teacher_disagreement_score":0.0040365667,"about_ca_system_score_codex":0.00034084843,"about_ca_system_score_gemma":0.0004405374,"threshold_uncertainty_score":0.008026183},"labels":[],"label_agreement":null},{"id":"W2057308010","doi":"10.1109/tsg.2014.2313612","title":"Optimal Bidding Strategy for Microgrids Considering Renewable Energy and Building Thermal Dynamics","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":375,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"","keywords":"Bidding; Microgrid; Renewable energy; Computer science; Mathematical optimization; Exploit; Scheduling (production processes); Electric power system; Stochastic programming; Demand response; Stochastic optimization; Flexibility (engineering); Electricity; Engineering; Power (physics); Economics; Microeconomics","score_opus":0.01230317281627084,"score_gpt":0.21150275610305472,"score_spread":0.1991995832867839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057308010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15117417,0.0005524671,0.8376729,0.0005027446,0.00005433485,0.00014277136,0.00010044425,0.00017954294,0.009620609],"genre_scores_gemma":[0.9761326,0.0001474332,0.021764403,0.000039072504,0.000013725513,0.000053232285,0.00003144328,0.000035293077,0.0017827709],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994981,0.00027164945,0.000016019121,0.000049904287,0.00007412755,0.0000901787],"domain_scores_gemma":[0.99909806,0.0005316188,0.00013341627,0.000037192764,0.000111354464,0.00008838762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013029521,0.00078529917,0.0013091317,0.00029166634,0.00043123093,0.0011115951,0.0011791178,0.00081781705,0.00265638],"category_scores_gemma":[0.0024986025,0.00065711926,0.00050778565,0.00055111176,0.0006450603,0.0010630104,0.0006705113,0.0007656139,0.0002600607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006248048,0.0000356216,0.00030905358,0.000045399545,0.000021824131,0.000087525026,0.000036581983,0.9848704,0.0007676159,0.0074067046,0.00037940286,0.0059773433],"study_design_scores_gemma":[0.00000852876,0.000016175485,0.000049619437,0.0000014595512,0.000003830592,0.000010622233,0.000012743483,0.9980071,0.00007253935,0.0017106354,0.000104471095,0.0000022778208],"about_ca_topic_score_codex":0.0045985933,"about_ca_topic_score_gemma":0.004776657,"teacher_disagreement_score":0.0045985933,"about_ca_system_score_codex":0.0009320487,"about_ca_system_score_gemma":0.0013158326,"threshold_uncertainty_score":0.0091436505},"labels":[],"label_agreement":null},{"id":"W2059033491","doi":"10.1016/j.adhoc.2010.08.005","title":"Wireless multimedia sensor and actor networks for the next generation power grid","year":2010,"lang":"en","type":"article","venue":"Ad Hoc Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":172,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Wireless sensor network; SCADA; Wireless; Grid; Key distribution in wireless sensor networks; Wireless network; Embedded system; Telecommunications; Distributed computing; Computer network; Engineering; Electrical engineering","score_opus":0.016011097090121894,"score_gpt":0.2067887693126555,"score_spread":0.1907776722225336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059033491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053216323,0.033760816,0.8166633,0.015817067,0.0033620598,0.00013288952,0.0004180464,0.001418524,0.07521101],"genre_scores_gemma":[0.8175852,0.016740823,0.10861219,0.00099439,0.0016730037,0.00010766525,0.00043533416,0.00011858604,0.05373288],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999174,0.000026727685,0.000004277641,0.000013023996,0.000029606188,0.0000090405265],"domain_scores_gemma":[0.99983585,0.00007137956,0.000012612429,0.000021093843,0.000042302046,0.000016750955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036290183,0.00017777039,0.0001739089,0.00026005326,0.00023604307,0.0006009094,0.00046681915,0.00050411915,0.004088126],"category_scores_gemma":[0.0006140589,0.0000904586,0.000091672686,0.00035584666,0.00023151484,0.0014144906,0.00032680292,0.00048055072,0.00038911283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003333467,0.00010542029,0.0012064874,0.0002729418,0.000040895946,0.00036774285,0.0001128126,0.082473345,0.013962242,0.20575158,0.056655377,0.63871783],"study_design_scores_gemma":[0.000038745373,0.00018399858,0.0010396331,0.000066290355,0.000041100997,0.00029730814,0.0001541097,0.6843654,0.005982424,0.14364998,0.1641536,0.000027486534],"about_ca_topic_score_codex":0.0011011563,"about_ca_topic_score_gemma":0.002745732,"teacher_disagreement_score":0.004088126,"about_ca_system_score_codex":0.00034597793,"about_ca_system_score_gemma":0.00032016487,"threshold_uncertainty_score":0.013676167},"labels":[],"label_agreement":null},{"id":"W2063136778","doi":"10.1109/tsg.2014.2313347","title":"A Distributed Demand Response Control Strategy Using Lyapunov Optimization","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Lyapunov optimization; HVAC; Demand response; Computer science; Mathematical optimization; Control theory (sociology); Optimization problem; Queueing theory; Power control; Engineering; Control (management); Control engineering; Power (physics); Air conditioning; Lyapunov equation; Mathematics","score_opus":0.011175270329871284,"score_gpt":0.2088614006157398,"score_spread":0.1976861302858685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063136778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013408703,0.00021327556,0.9781637,0.00026394904,0.00007517039,0.00006910191,0.000027322294,0.00026623905,0.0075125927],"genre_scores_gemma":[0.9347033,0.0001884468,0.058110327,0.00016491151,0.000058426664,0.0002787013,0.000080768164,0.000041066283,0.006374052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996679,0.00008236698,0.000016242826,0.000091657705,0.00009340472,0.000048488702],"domain_scores_gemma":[0.99964654,0.0001420448,0.000047768906,0.000020605115,0.00011783184,0.00002520913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005750497,0.001173564,0.0009554847,0.0003415543,0.00040287944,0.0009693155,0.0008827788,0.00085235224,0.0022717502],"category_scores_gemma":[0.000738061,0.00031681333,0.00046302666,0.00044013862,0.00047087262,0.00045629,0.00092823314,0.0007833921,0.0003767747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064992004,0.00007710546,0.00017166605,0.00008995391,0.000029042669,0.0001260017,0.00006643826,0.9535504,0.0047615897,0.011604369,0.0014303547,0.028028099],"study_design_scores_gemma":[0.000012322484,0.000030095009,0.000021024274,0.0000019081313,0.0000024410676,0.0000061310348,0.0000039612355,0.99886465,0.00019660978,0.0006427329,0.00021540646,0.0000027949984],"about_ca_topic_score_codex":0.004749895,"about_ca_topic_score_gemma":0.003273177,"teacher_disagreement_score":0.004749895,"about_ca_system_score_codex":0.00069678493,"about_ca_system_score_gemma":0.00087580224,"threshold_uncertainty_score":0.009444475},"labels":[],"label_agreement":null},{"id":"W2064740578","doi":"10.1109/pimrc.2011.6139654","title":"Web services for indoor energy management in a smart grid environment","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; HVAC; Thermostat; Computer science; Home automation; Demand response; The Internet; Service provider; Smart meter; Web service; Computer network; Service (business); Telecommunications; Air conditioning; World Wide Web; Engineering; Electricity; Electrical engineering","score_opus":0.010084887185893942,"score_gpt":0.1641890799949592,"score_spread":0.15410419280906523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064740578","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010696663,0.0025959308,0.8731607,0.001868271,0.0006605957,0.00031733036,0.0005434635,0.025311803,0.08484519],"genre_scores_gemma":[0.27531618,0.0047898656,0.5971597,0.0016862191,0.0006169024,0.00075437484,0.0033254311,0.0029274626,0.11342384],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992949,0.0002010084,0.000050241604,0.000050275878,0.00031757972,0.00008601758],"domain_scores_gemma":[0.99953866,0.00012590556,0.00002566097,0.00012796196,0.0001152002,0.00006662058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063336024,0.0005782915,0.0005172739,0.0006310903,0.00081631873,0.0022850751,0.0009168871,0.0015077025,0.009312243],"category_scores_gemma":[0.0010710929,0.00030680973,0.00056807155,0.0011082017,0.00052638125,0.0026977872,0.0013217283,0.0013657536,0.005652445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047401045,0.00047366656,0.0014282549,0.00068956905,0.000113667935,0.0019261573,0.0007282416,0.022012416,0.029684667,0.32888833,0.09449512,0.51908594],"study_design_scores_gemma":[0.00013103003,0.00013484813,0.0009886965,0.0002352336,0.00006664075,0.0011868962,0.00030822572,0.21791475,0.015370206,0.11335153,0.6502301,0.0000818771],"about_ca_topic_score_codex":0.0035786326,"about_ca_topic_score_gemma":0.003544507,"teacher_disagreement_score":0.009312243,"about_ca_system_score_codex":0.00058721827,"about_ca_system_score_gemma":0.00081047264,"threshold_uncertainty_score":0.031152546},"labels":[],"label_agreement":null},{"id":"W2065141020","doi":"10.1109/smartgridcomm.2013.6687961","title":"Critiquing Time-of-Use pricing in Ontario","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Aggregate (composite); Peak load; Metering mode; Software deployment; Computer science; Econometrics; Environmental economics; Operations research; Economics; Mathematics; Automotive engineering; Engineering","score_opus":0.008743665795431245,"score_gpt":0.16649301408699632,"score_spread":0.1577493482915651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065141020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9228221,0.0007517254,0.0043470985,0.0077230353,0.00007762022,0.00019446285,0.0015414653,0.00010148176,0.06244096],"genre_scores_gemma":[0.9940481,0.00031201032,0.001266517,0.00016335401,0.000016608343,0.000016628803,0.00023154069,0.000021091962,0.003924162],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970741,0.0004346026,0.000120326054,0.00017616083,0.0014971257,0.0006976698],"domain_scores_gemma":[0.9934534,0.0016429885,0.00077830715,0.00026781575,0.0032234716,0.0006340144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020181003,0.00018036166,0.00028403144,0.000915087,0.0029151929,0.0032398982,0.0012622139,0.0005248154,0.002906399],"category_scores_gemma":[0.012031257,0.00022337974,0.00033347646,0.0032633273,0.0010714893,0.0011677614,0.0007532684,0.00047501046,0.00014840016],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086152664,0.00026037928,0.6482164,0.0003546554,0.00025557308,0.0023488663,0.016515138,0.0639248,0.007367233,0.07347881,0.045864902,0.1405517],"study_design_scores_gemma":[0.00009555425,0.00013857262,0.73198706,0.00015219269,0.00017820315,0.00034353815,0.037744045,0.10193289,0.0024932264,0.011146162,0.11356075,0.0002278034],"about_ca_topic_score_codex":0.98566806,"about_ca_topic_score_gemma":0.99347466,"teacher_disagreement_score":0.05749462,"about_ca_system_score_codex":0.05749462,"about_ca_system_score_gemma":0.044241678,"threshold_uncertainty_score":0.41715467},"labels":[],"label_agreement":null},{"id":"W2066247907","doi":"10.1109/epec.2010.5697216","title":"A centralized controller to control power demands of electric water heaters for peek shaving of total house-hold power demands","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Peaking power plant; Controller (irrigation); Water heater; Electric power; Electric heating; Power (physics); Peak demand; Electric energy consumption; Energy storage; Automotive engineering; Electricity; Storage heater; Computer science; Environmental science; Electric energy; Engineering; Electrical engineering; Mechanical engineering; Distributed generation; Renewable energy; Heat pump","score_opus":0.0031361933928525745,"score_gpt":0.18565064467241307,"score_spread":0.1825144512795605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066247907","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13819033,0.00030870683,0.8380451,0.00027873067,0.00024447846,0.00025177447,0.00008620957,0.0031283067,0.019466288],"genre_scores_gemma":[0.9824948,0.000045283945,0.013544351,0.000043837073,0.0000400258,0.00007841411,0.000028739738,0.000025492805,0.0036990908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970007,0.000033530425,0.000011277588,0.000114243805,0.00010327478,0.000037564903],"domain_scores_gemma":[0.9996282,0.00007776489,0.000056802106,0.000038088427,0.0001674378,0.00003172722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003061707,0.0005232303,0.0005320259,0.00029498525,0.00049408607,0.00088646304,0.0009192672,0.00031204888,0.0020804626],"category_scores_gemma":[0.0004784899,0.00017495206,0.00024217601,0.00025700327,0.0003033312,0.00029912058,0.00025626528,0.0006138395,0.00036663745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071342866,0.00089490734,0.003458233,0.0002917442,0.00016742294,0.0003450577,0.00035128734,0.45065153,0.13904734,0.0093174605,0.009942236,0.38481933],"study_design_scores_gemma":[0.00014636277,0.00033776005,0.001957026,0.000012979351,0.000054894415,0.00010212362,0.00004463557,0.96866935,0.023829862,0.0011977351,0.0036180457,0.00002917718],"about_ca_topic_score_codex":0.0040425328,"about_ca_topic_score_gemma":0.005656863,"teacher_disagreement_score":0.0040425328,"about_ca_system_score_codex":0.0005642223,"about_ca_system_score_gemma":0.0009870464,"threshold_uncertainty_score":0.008037984},"labels":[],"label_agreement":null},{"id":"W2067086181","doi":"10.1080/10485230709509729","title":"More Than 10 Ways To Sweeten A Retail Power Contract","year":2007,"lang":"en","type":"article","venue":"Strategic Planning for Energy and the Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Procurement; Marketing; Purchasing; Leverage (statistics); Computer science","score_opus":0.01690467085464529,"score_gpt":0.20233104147764858,"score_spread":0.1854263706230033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067086181","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024270019,0.058755934,0.04800503,0.08644949,0.0135493865,0.0007381871,0.00046041625,0.0013822851,0.7663893],"genre_scores_gemma":[0.19645862,0.052218445,0.07033895,0.07175426,0.0055638854,0.0007596532,0.0012869695,0.0012187375,0.6004005],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98809284,0.00382847,0.0008453527,0.000505465,0.0059413165,0.00078651914],"domain_scores_gemma":[0.98074085,0.009021881,0.0012338576,0.0022235569,0.004991318,0.0017885176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0111385975,0.0005054816,0.0005921368,0.0029240435,0.0030478667,0.008682378,0.0016600073,0.0059034443,0.052864354],"category_scores_gemma":[0.02025393,0.00060803595,0.0013779833,0.0022413908,0.002370705,0.012012284,0.005197397,0.005477568,0.008850345],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013310766,0.0002628194,0.0016387254,0.0009406375,0.00004389965,0.0007450407,0.0013026595,0.0010234223,0.0014814021,0.2313506,0.32738906,0.43368852],"study_design_scores_gemma":[0.000015862859,0.00008989871,0.00041431468,0.0005810872,0.000015695437,0.00031473397,0.0004254896,0.00019712272,0.00034027387,0.008174641,0.9893917,0.000039062266],"about_ca_topic_score_codex":0.0019687393,"about_ca_topic_score_gemma":0.0057466435,"teacher_disagreement_score":0.052864354,"about_ca_system_score_codex":0.002314374,"about_ca_system_score_gemma":0.003957805,"threshold_uncertainty_score":0.17684889},"labels":[],"label_agreement":null},{"id":"W2069074275","doi":"10.1109/smartgridcomm.2011.6102353","title":"A game-theoretical decision-making scheme for electricity retailers in the smart grid with demand-side management","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Stackelberg competition; Smart grid; Procurement; Electricity; Electricity market; Demand response; Grid; Game theory; Electricity retailing; Computer science; Scheme (mathematics); Environmental economics; Demand side; Business; Operations research; Microeconomics; Marketing; Economics","score_opus":0.010680650758036737,"score_gpt":0.2075209571288451,"score_spread":0.19684030637080838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069074275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05611054,0.00009394445,0.93046594,0.00091530447,0.00006774856,0.00043419842,0.000110023306,0.00014697619,0.011655445],"genre_scores_gemma":[0.8910077,0.00011796988,0.10434677,0.00014489787,0.000028437764,0.00031948535,0.000051314517,0.000014257548,0.0039690477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976319,0.0013745781,0.00009355692,0.0002815854,0.00037892,0.000239434],"domain_scores_gemma":[0.9982267,0.0010233193,0.00019499828,0.00012884532,0.00019718664,0.00022892797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002854732,0.0009752505,0.0010284495,0.00039056627,0.0009822812,0.0018737698,0.002332579,0.0018837606,0.00396503],"category_scores_gemma":[0.0040066913,0.00043963187,0.0008870144,0.0005534395,0.0017873512,0.0024718118,0.0017110053,0.0017078765,0.000399444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043162546,0.00025661648,0.0006141929,0.00010646733,0.00009139443,0.00040981354,0.0004729524,0.6616511,0.004601679,0.31131306,0.001662281,0.018388811],"study_design_scores_gemma":[0.0001019558,0.00011007525,0.00007231838,0.000008144971,0.000016582575,0.000049992304,0.000046314406,0.9503862,0.00053500856,0.04763513,0.0010140168,0.000024092555],"about_ca_topic_score_codex":0.0041078827,"about_ca_topic_score_gemma":0.00432782,"teacher_disagreement_score":0.0041078827,"about_ca_system_score_codex":0.0022469875,"about_ca_system_score_gemma":0.0027650846,"threshold_uncertainty_score":0.016303122},"labels":[],"label_agreement":null},{"id":"W2070599540","doi":"10.1109/pvsc.2013.6744304","title":"Utility scale PV plant variability and energy storage for ramp rate control","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy storage; Photovoltaic system; Reliability engineering; Power station; Environmental science; Scale (ratio); Computer science; Automotive engineering; Load shifting; Control (management); Power (physics); Engineering; Electrical engineering; Electricity","score_opus":0.00542467076731364,"score_gpt":0.16624734823821188,"score_spread":0.16082267747089823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070599540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93459094,0.00013678164,0.061045412,0.00011847234,0.000010113399,0.000054423705,0.00030106187,0.00014098918,0.0036017564],"genre_scores_gemma":[0.99832314,0.000016738139,0.0015416712,0.0000033570363,0.0000020501982,0.000004874338,0.00003782624,0.000004586101,0.00006580846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997888,0.00005911356,0.000009870844,0.00003019355,0.00009345978,0.000018572317],"domain_scores_gemma":[0.9989974,0.0005996396,0.00017233456,0.00009658173,0.00011288231,0.000021198515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046781002,0.00022637977,0.00023757706,0.00031882618,0.00017343099,0.000418827,0.0003359069,0.00017626934,0.00071156124],"category_scores_gemma":[0.0017287666,0.00011742392,0.00020622695,0.0006510076,0.0002183449,0.00042406705,0.00016729154,0.00031796226,0.00004787063],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006299495,0.00021968271,0.13353704,0.0001576868,0.00017966046,0.0005611282,0.00015749023,0.7155341,0.067374796,0.0067899143,0.0006831108,0.0741754],"study_design_scores_gemma":[0.00001777598,0.00023130351,0.11640803,0.000014047749,0.000032668166,0.00019668645,0.00008717294,0.8625092,0.017066443,0.0025136352,0.0008939756,0.00002902664],"about_ca_topic_score_codex":0.0030980632,"about_ca_topic_score_gemma":0.0059988596,"teacher_disagreement_score":0.0030980632,"about_ca_system_score_codex":0.00043440104,"about_ca_system_score_gemma":0.0002898523,"threshold_uncertainty_score":0.0061600804},"labels":[],"label_agreement":null},{"id":"W2071232075","doi":"10.1016/j.enpol.2011.07.038","title":"A comparison of four methods to evaluate the effect of a utility residential air-conditioner load control program on peak electricity use","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; National Research Council Canada","funders":"","keywords":"Thermostat; Air conditioning; Control (management); Event (particle physics); Operations management; Electricity; Peak load; Regression analysis; Demand response; Statistics; Cycling; Econometrics; Environmental economics; Operations research; Agricultural economics; Economics; Engineering; Mathematics; Geography; Automotive engineering","score_opus":0.04281479025599804,"score_gpt":0.355821444402578,"score_spread":0.31300665414657997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071232075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9397473,0.0016347279,0.051303804,0.00016697981,0.00020398166,0.0012377287,0.0007608871,0.00033508576,0.0046094144],"genre_scores_gemma":[0.96671486,0.0004371449,0.029343294,0.000085351334,0.000046219568,0.00086039165,0.00044678035,0.000050908286,0.0020149725],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9919465,0.005535266,0.0003916708,0.0005468123,0.0013392693,0.00024051953],"domain_scores_gemma":[0.9283912,0.064078555,0.0022485983,0.0014558046,0.0033501426,0.0004755722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008893364,0.0013232133,0.0013326216,0.003116642,0.0004967369,0.0011146304,0.0010360852,0.0015154319,0.0020210596],"category_scores_gemma":[0.023350075,0.00040124153,0.0017679048,0.0014622478,0.0006939483,0.001158031,0.0006717226,0.00080031465,0.00025946382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.186275,0.023433596,0.13499513,0.0025678377,0.006504558,0.00015421357,0.0009447051,0.12357617,0.02135931,0.0032507505,0.0016194794,0.4953193],"study_design_scores_gemma":[0.01726754,0.10108234,0.23510902,0.00020409322,0.0043988912,0.00022067613,0.0012032278,0.57942516,0.054064203,0.0035346032,0.0029002614,0.0005899925],"about_ca_topic_score_codex":0.007359971,"about_ca_topic_score_gemma":0.006777046,"teacher_disagreement_score":0.008893364,"about_ca_system_score_codex":0.0015040396,"about_ca_system_score_gemma":0.0008831809,"threshold_uncertainty_score":0.04703319},"labels":[],"label_agreement":null},{"id":"W2073325490","doi":"10.1109/epec.2013.6802917","title":"Demand request dispatch approach for electric distribution systems","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"London Hydro","funders":"","keywords":"Smart grid; Bidding; Demand response; Computer science; Flexibility (engineering); Interoperability; Electricity; Schedule; Thermostat; Testbed; Electricity market; Smart meter; Grid; Electric utility; Load management; Home automation; Peak demand; Telecommunications; Electrical engineering; Business; Engineering; Computer network; Economics","score_opus":0.006438320414579433,"score_gpt":0.17269064880894036,"score_spread":0.16625232839436094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073325490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022912135,0.00016760358,0.9699838,0.0004604044,0.00013739089,0.00013827105,0.00018159844,0.00020253361,0.026437266],"genre_scores_gemma":[0.5871376,0.0008211751,0.33476055,0.00039329423,0.00041744174,0.0006384745,0.00081090565,0.00043104799,0.07458966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991862,0.00032186118,0.000040312018,0.00011064897,0.00027312385,0.00006788794],"domain_scores_gemma":[0.9996822,0.00013886888,0.000021426245,0.00003383653,0.000100183606,0.000023442262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010966434,0.0008652127,0.00069916225,0.00041867496,0.0005801304,0.0016514686,0.0012559671,0.0008427692,0.01871896],"category_scores_gemma":[0.0016086939,0.00033060406,0.0005061974,0.00068363297,0.00046358226,0.0016160497,0.0009821563,0.0011046565,0.002169349],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009336075,0.0000764724,0.00017722636,0.0001719048,0.000027421034,0.00019072418,0.0001654148,0.5253963,0.0020200587,0.39900136,0.014505382,0.058174435],"study_design_scores_gemma":[0.000025996716,0.000023315375,0.000040264847,0.000007675306,0.000004932653,0.00003517929,0.00004490112,0.9241185,0.00034658104,0.05916759,0.016177274,0.000007801812],"about_ca_topic_score_codex":0.0030652522,"about_ca_topic_score_gemma":0.003837635,"teacher_disagreement_score":0.01871896,"about_ca_system_score_codex":0.0013857946,"about_ca_system_score_gemma":0.0010911168,"threshold_uncertainty_score":0.062621176},"labels":[],"label_agreement":null},{"id":"W2073414138","doi":"10.1109/epec.2012.6474987","title":"Smart energy monitoring and management system for industrial applications","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Energy consumption; Energy management; Energy management system; Scheduling (production processes); Computer science; Fuzzy inference; Energy (signal processing); Efficient energy use; Energy accounting; Fuzzy logic; Risk analysis (engineering); Engineering; Operations management; Business; Fuzzy control system; Adaptive neuro fuzzy inference system; Artificial intelligence","score_opus":0.02336864558465153,"score_gpt":0.21139338738888852,"score_spread":0.188024741804237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073414138","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17124732,0.0010940222,0.73522425,0.00082490966,0.00034667068,0.0008662462,0.001229969,0.042540777,0.046625845],"genre_scores_gemma":[0.89339584,0.00032941613,0.08641306,0.0002820974,0.000056144287,0.00040739478,0.0008172955,0.00011494193,0.018183868],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99983823,0.000037144855,0.000010703861,0.000034408593,0.000067277586,0.000012246842],"domain_scores_gemma":[0.9998272,0.000044269756,0.000020100491,0.000037166912,0.00005836891,0.000012799468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027128131,0.0002656152,0.00024856805,0.00037757005,0.00027788096,0.0003660561,0.00042218983,0.00039881124,0.009910521],"category_scores_gemma":[0.00048499493,0.000119789875,0.00012024134,0.00033797606,0.00010153771,0.0005524421,0.0002629085,0.00028886908,0.0020643205],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009056235,0.0005055449,0.009890828,0.0003745218,0.000050019647,0.00048896583,0.00027280243,0.025494352,0.14855275,0.006555444,0.03952807,0.7673811],"study_design_scores_gemma":[0.00030089257,0.0013552776,0.032717034,0.00013964769,0.00014013812,0.0009842468,0.00016990285,0.6461924,0.14512135,0.0055480986,0.16722442,0.00010663992],"about_ca_topic_score_codex":0.0008496666,"about_ca_topic_score_gemma":0.00096214603,"teacher_disagreement_score":0.009910521,"about_ca_system_score_codex":0.0002269436,"about_ca_system_score_gemma":0.00026760093,"threshold_uncertainty_score":0.03315401},"labels":[],"label_agreement":null},{"id":"W2074230582","doi":"10.1109/infocom.2014.6848233","title":"Optimal Combined Heat and Power system scheduling in smart grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Queueing theory; Smart grid; Optimization problem; Scheduling (production processes); Renewable energy; Convex optimization; Stochastic optimization; Computer network; Engineering; Regular polygon; Lyapunov equation; Electrical engineering; Mathematics","score_opus":0.004524337131012219,"score_gpt":0.17230556132754998,"score_spread":0.16778122419653776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074230582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26959825,0.00086146116,0.7219709,0.00071335444,0.00012331767,0.00011901844,0.00016447868,0.00059803185,0.005851221],"genre_scores_gemma":[0.9747096,0.0001276829,0.02361667,0.000045958746,0.000027250437,0.000040460556,0.000048349033,0.000038099246,0.001345886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995534,0.00018613553,0.000015178,0.00007447307,0.00006824465,0.00010259088],"domain_scores_gemma":[0.9986577,0.00095414236,0.00014725642,0.000045739314,0.00009786162,0.00009728869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011130897,0.0008386296,0.0012764321,0.00049549434,0.00041543398,0.00089587254,0.0006162734,0.0006826545,0.0014308739],"category_scores_gemma":[0.002481592,0.00064251124,0.0003083507,0.00069844566,0.0007702972,0.0013030637,0.0006051764,0.0006702004,0.00015740473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006816297,0.000017810156,0.00014178583,0.0000094474,0.000007710802,0.000011759496,0.000009231271,0.9935567,0.00025773645,0.0018418778,0.0001981881,0.0038795352],"study_design_scores_gemma":[0.000010314672,0.000009684887,0.000040483366,5.9334025e-7,0.0000019718061,0.0000012061791,0.00000399773,0.99872667,0.000094066614,0.0010666541,0.000043021268,0.0000013073326],"about_ca_topic_score_codex":0.013912064,"about_ca_topic_score_gemma":0.01240516,"teacher_disagreement_score":0.013912064,"about_ca_system_score_codex":0.001724075,"about_ca_system_score_gemma":0.001934622,"threshold_uncertainty_score":0.027662158},"labels":[],"label_agreement":null},{"id":"W2074544703","doi":"10.1109/isgteurope.2012.6465896","title":"Residential energy management using a moving window algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Window (computing); Baseline (sea); Energy consumption; Scope (computer science); Greenhouse gas; Scheduling (production processes); Smart grid; Energy management; Grid; Algorithm; Energy (signal processing); Real-time computing; Mathematical optimization; Engineering; Statistics; Mathematics","score_opus":0.009405769269170045,"score_gpt":0.19915924305106775,"score_spread":0.1897534737818977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074544703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010174266,0.00014371033,0.98826665,0.00005684681,0.000037147252,0.00001925572,0.000022068245,0.00026342965,0.0010165832],"genre_scores_gemma":[0.665655,0.00042038754,0.32824022,0.00006416674,0.000093425384,0.00011383197,0.00015314552,0.00012861975,0.0051311785],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970055,0.00008444598,0.000017683647,0.00008740181,0.00006853935,0.000041416653],"domain_scores_gemma":[0.99968565,0.00015386104,0.000040647137,0.000027552533,0.00007889225,0.000013387599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007068561,0.0005893228,0.0009850144,0.0003826744,0.00035291637,0.00078596507,0.00089664926,0.00076808216,0.0020416745],"category_scores_gemma":[0.0015259803,0.00031912874,0.0004925778,0.0007216226,0.0002669814,0.001177418,0.0005113963,0.00077204953,0.000341833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007447772,0.000031356605,0.00029283777,0.000024599996,0.000026808963,0.000026241409,0.000014688151,0.93319935,0.0012349017,0.0048771957,0.00065675395,0.059540886],"study_design_scores_gemma":[0.0000018418573,0.0000070527876,0.000031753396,8.047507e-7,0.0000023338034,0.0000026711652,0.0000010524324,0.99916375,0.00024473685,0.00039616282,0.00014650688,0.0000013089441],"about_ca_topic_score_codex":0.0075808526,"about_ca_topic_score_gemma":0.0048564174,"teacher_disagreement_score":0.0075808526,"about_ca_system_score_codex":0.0004624191,"about_ca_system_score_gemma":0.00078649586,"threshold_uncertainty_score":0.015073419},"labels":[],"label_agreement":null},{"id":"W2075435130","doi":"10.1016/j.egypro.2014.07.069","title":"Investment Incentive of Grid Connected Solar Photovoltaic Power Plant under Proposed Feed-in Tariffs Framework in Thailand","year":2014,"lang":"en","type":"article","venue":"Energy Procedia","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Resources Canada; Thammasat University","keywords":"Photovoltaic system; Renewable energy; Net metering; Grid parity; Feed-in tariff; Electricity; Zero-energy building; Environmental economics; Solar power; Photovoltaics; Environmental science; Microgrid; Solar energy; Environmental engineering; Engineering; Distributed generation; Electrical engineering; Economics; Power (physics); Energy policy; Physics","score_opus":0.0045362858638961145,"score_gpt":0.17211419416392984,"score_spread":0.16757790830003372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075435130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8932955,0.0005379754,0.049156733,0.0009606459,0.00004854424,0.00019952949,0.0006356928,0.0001428363,0.05502247],"genre_scores_gemma":[0.9952408,0.00013112668,0.0011628646,0.000020177411,0.000004406019,0.000020886897,0.00006528784,0.0000058116207,0.0033486574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993487,0.0002739883,0.000018729806,0.00007194503,0.000088707755,0.0001979467],"domain_scores_gemma":[0.9994771,0.00017887441,0.00012893243,0.000023630828,0.00010207461,0.000089362555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008619122,0.00035624174,0.00037337412,0.0003984474,0.0004190267,0.0020260226,0.000838662,0.0008243191,0.0042443476],"category_scores_gemma":[0.0012001729,0.0002784042,0.00057810225,0.0005242087,0.00040853219,0.001415132,0.0006570901,0.0008197243,0.00015922435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027929476,0.00024598883,0.011543287,0.00013834311,0.000047409863,0.0009317425,0.0001226873,0.9065733,0.0011116262,0.061681714,0.0016323258,0.015692392],"study_design_scores_gemma":[0.000072108545,0.00045005904,0.008921612,0.00004916011,0.00007983325,0.00027860713,0.00068205263,0.96395886,0.0011088068,0.020078864,0.004269331,0.000050745046],"about_ca_topic_score_codex":0.017497092,"about_ca_topic_score_gemma":0.015395122,"teacher_disagreement_score":0.017497092,"about_ca_system_score_codex":0.0021560611,"about_ca_system_score_gemma":0.0020916208,"threshold_uncertainty_score":0.034790516},"labels":[],"label_agreement":null},{"id":"W2075816587","doi":"10.3182/20140824-6-za-1003.00630","title":"Collective Target Tracking Mean Field Control for Markovian Jump-Driven Models of Electric Water Heating Loads","year":2014,"lang":"en","type":"article","venue":"IFAC Proceedings Volumes","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Control theory (sociology); Electric power system; Markov process; Jump; Computer science; Simulation; Engineering; Power (physics); Control (management); Mathematics; Physics","score_opus":0.007557996473183162,"score_gpt":0.19143137049267786,"score_spread":0.1838733740194947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075816587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13418244,0.00039236783,0.8544278,0.0011798092,0.00022113058,0.000052567317,0.00011694713,0.00027467104,0.009152341],"genre_scores_gemma":[0.9883079,0.00010819597,0.0050392756,0.00007946836,0.00004766663,0.000049645587,0.000058302314,0.00003286428,0.006276692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995751,0.00013116829,0.000012863684,0.00011729984,0.000068988724,0.00009463135],"domain_scores_gemma":[0.9976006,0.0015889738,0.0003391484,0.0000819354,0.00025388907,0.00013546975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001531754,0.0009365638,0.0015614786,0.0005340068,0.00063155184,0.0014697647,0.0012282295,0.001639788,0.0024970507],"category_scores_gemma":[0.0044376436,0.0006974745,0.00086518476,0.0004760099,0.0018736031,0.0010606433,0.0019633633,0.001475877,0.00019995702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007002981,0.000021614487,0.00022199696,0.000025478052,0.0000263664,0.00002808729,0.000035887482,0.98598367,0.0006857018,0.0098041715,0.00039848068,0.002698568],"study_design_scores_gemma":[0.0000040630944,0.000009379819,0.00004315149,0.0000010982252,0.0000019690121,0.0000014483555,0.0000025618433,0.9982735,0.00004707538,0.0015764054,0.000036883805,0.0000024238834],"about_ca_topic_score_codex":0.0142887095,"about_ca_topic_score_gemma":0.006796627,"teacher_disagreement_score":0.0142887095,"about_ca_system_score_codex":0.0014703597,"about_ca_system_score_gemma":0.0010776652,"threshold_uncertainty_score":0.02841109},"labels":[],"label_agreement":null},{"id":"W2076169396","doi":"10.1109/pesgm.2012.6345244","title":"BC Hydro approach to load modeling in state estimation","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Observability; Estimator; Energy management system; Robustness (evolution); Computer science; Electric power system; Sensitivity (control systems); Load management; Control theory (sociology); Reliability engineering; Real-time computing; Engineering; Energy management; Power (physics); Energy (signal processing); Electronic engineering; Control (management); Electrical engineering","score_opus":0.023170022960666833,"score_gpt":0.21038521705708813,"score_spread":0.1872151940964213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076169396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024637051,0.000101118785,0.9888271,0.00023841423,0.00003821797,0.00002291687,0.00010896761,0.00028279953,0.007916785],"genre_scores_gemma":[0.6106343,0.0011203656,0.35289392,0.00046375612,0.00025046556,0.00030195725,0.00041407163,0.00040506816,0.033516012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953806,0.00017996591,0.00001930707,0.00007168099,0.00016468784,0.000026356638],"domain_scores_gemma":[0.9995479,0.00021587286,0.00005475205,0.00007824603,0.00008982389,0.00001335444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044303492,0.00070906465,0.00055996387,0.0005884607,0.0004787258,0.00091054477,0.0010493057,0.00060818373,0.0047202324],"category_scores_gemma":[0.0017638139,0.0004919685,0.00049570977,0.00080996036,0.0006305601,0.0016639829,0.0009865486,0.0012142828,0.0011444353],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034239692,0.00003356818,0.00076302025,0.00007255328,0.000029616587,0.00009260918,0.00012116922,0.8245549,0.0017756053,0.116261326,0.0020390544,0.054222338],"study_design_scores_gemma":[0.0000034638695,0.000010551211,0.00009847317,0.000007761198,0.00000517891,0.000013140128,0.0000098505625,0.98066646,0.00032701224,0.015484841,0.0033674997,0.000005746779],"about_ca_topic_score_codex":0.017555874,"about_ca_topic_score_gemma":0.020199837,"teacher_disagreement_score":0.017555874,"about_ca_system_score_codex":0.0009369699,"about_ca_system_score_gemma":0.0010435679,"threshold_uncertainty_score":0.03490734},"labels":[],"label_agreement":null},{"id":"W2077247685","doi":"10.1109/energytech.2013.6645329","title":"Modeling, optimal selection and scheduling of interruptible loads in smart distribution systems","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Computer science; Procurement; Scheduling (production processes); Demand response; Context (archaeology); Payment; Grid; Incentive; Operations research; Mathematical optimization; Reliability engineering; Electricity; Engineering; Electrical engineering; Business","score_opus":0.00879355523304534,"score_gpt":0.19461659387434807,"score_spread":0.18582303864130273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077247685","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23463242,0.00042858347,0.7418995,0.0005268544,0.00006764728,0.00013148341,0.00031613838,0.00037360995,0.021623684],"genre_scores_gemma":[0.9843285,0.00023374552,0.010788408,0.000022792125,0.00001898996,0.000059924594,0.000077909266,0.000042196247,0.004427442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969614,0.00011310486,0.000010601882,0.000044410506,0.00007307322,0.000062694475],"domain_scores_gemma":[0.9996898,0.00015143496,0.000074400945,0.000014967691,0.00003819437,0.000031291944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047738105,0.00062205293,0.00075094454,0.00029354266,0.00042674798,0.0009807793,0.00087572593,0.0007452328,0.0020609943],"category_scores_gemma":[0.0010607241,0.0005463754,0.0003330523,0.0004619752,0.00064732606,0.0011768691,0.0004359394,0.00066042325,0.00021588066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012318788,0.000007448877,0.00014895566,0.0000052916603,0.0000019559232,0.000013572745,0.000009580569,0.9973098,0.00014750149,0.001554401,0.00007028013,0.0007190151],"study_design_scores_gemma":[0.0000047200756,0.0000087132485,0.000060447914,9.753188e-7,0.0000015002436,0.0000022290149,0.000007414865,0.998912,0.000053230146,0.00080928486,0.00013806309,0.000001413641],"about_ca_topic_score_codex":0.018023157,"about_ca_topic_score_gemma":0.015572694,"teacher_disagreement_score":0.018023157,"about_ca_system_score_codex":0.0012927615,"about_ca_system_score_gemma":0.0012165913,"threshold_uncertainty_score":0.035836518},"labels":[],"label_agreement":null},{"id":"W2078008301","doi":"10.1109/allerton.2012.6483369","title":"Integrating Demand Response into agent-based models of electricity markets","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Electricity market; Reinforcement learning; Electricity; Computer science; Profit (economics); Flexibility (engineering); Offset (computer science); Microeconomics; Industrial organization; Operations research; Business; Economics; Artificial intelligence; Engineering","score_opus":0.01198410563442517,"score_gpt":0.21281181506671976,"score_spread":0.20082770943229458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078008301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059926156,0.0003853181,0.91406345,0.0016097528,0.00014258178,0.00014895278,0.00027347557,0.00034557632,0.023104727],"genre_scores_gemma":[0.9334189,0.0004001922,0.053440582,0.00018620287,0.000070880706,0.00028895467,0.00012904503,0.00006153033,0.01200362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943143,0.00029926244,0.000022999855,0.00008212383,0.000091029804,0.00007313969],"domain_scores_gemma":[0.9987405,0.0008193489,0.0001523901,0.000057388937,0.00013889547,0.000091407775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094358006,0.000798776,0.00088289817,0.0003744478,0.00051350845,0.0018985124,0.0017282828,0.0021417344,0.004343322],"category_scores_gemma":[0.0029713742,0.00048630644,0.000558575,0.0005112521,0.0009964771,0.0016541682,0.0010733758,0.0016033517,0.00048923417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019325076,0.000025684152,0.00026254312,0.000016215685,0.0000135923665,0.000048376438,0.00003597336,0.96523273,0.00018514099,0.03240732,0.00020627477,0.0015468345],"study_design_scores_gemma":[0.000008564823,0.000006854949,0.000026044805,0.0000017434294,0.0000023220034,0.0000043529344,0.000006806145,0.99197716,0.000027938931,0.0076238667,0.00031142178,0.0000028502845],"about_ca_topic_score_codex":0.008956403,"about_ca_topic_score_gemma":0.0061003715,"teacher_disagreement_score":0.008956403,"about_ca_system_score_codex":0.0012582109,"about_ca_system_score_gemma":0.0011659458,"threshold_uncertainty_score":0.017808557},"labels":[],"label_agreement":null},{"id":"W2080276913","doi":"10.1109/smartgridcomm.2012.6485969","title":"Distributed control for reducing carbon footprint in the residential sector","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Carbon footprint; Provisioning; Computer science; Duration (music); Power (physics); Control (management); Automotive engineering; Reduction (mathematics); Footprint; Grid; Real-time computing; Environmental economics; Computer network; Engineering; Greenhouse gas","score_opus":0.011614200123997685,"score_gpt":0.2069149266279717,"score_spread":0.195300726503974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080276913","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.120219365,0.0011883853,0.8570831,0.00081075466,0.00018349556,0.000088846034,0.00006546643,0.0008210598,0.019539537],"genre_scores_gemma":[0.99205595,0.00010489005,0.0065311445,0.000045134377,0.000017184273,0.000015819682,0.000009042022,0.000007771433,0.0012131459],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996985,0.000069253285,0.000011274388,0.00008435808,0.00008611316,0.00005037568],"domain_scores_gemma":[0.9996778,0.00014162529,0.00004105412,0.00003572035,0.00008558111,0.000018296267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045319716,0.0004020994,0.00036609868,0.00021858547,0.00038304357,0.0006228627,0.00054038514,0.0003462429,0.0018122327],"category_scores_gemma":[0.0008390097,0.00010583087,0.00018925869,0.00029351524,0.0005393521,0.00043013372,0.00042691355,0.0003786581,0.00011684267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040323177,0.00029027858,0.0011566306,0.00016360842,0.000058618956,0.0001587136,0.00009566047,0.78621113,0.01996465,0.035038993,0.0028639634,0.1535945],"study_design_scores_gemma":[0.000056111196,0.00009524677,0.000376482,0.000007643777,0.000014265511,0.00001683286,0.000023773686,0.98516846,0.0026353712,0.010154866,0.0014435534,0.0000073840565],"about_ca_topic_score_codex":0.0071920645,"about_ca_topic_score_gemma":0.009365433,"teacher_disagreement_score":0.0071920645,"about_ca_system_score_codex":0.0010588554,"about_ca_system_score_gemma":0.0006581358,"threshold_uncertainty_score":0.014300406},"labels":[],"label_agreement":null},{"id":"W2080349679","doi":"10.5539/eer.v3n2p139","title":"Economic Value Approach to Intermittent Power Generation in the Nordic Power Markets","year":2013,"lang":"en","type":"article","venue":"Energy and Environment Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"European Association of Environmental and Resource Economists; Yrjö Jahnssonin Säätiö","keywords":"Dispatchable generation; Electricity generation; Renewable energy; Cost of electricity by source; Electricity; Production (economics); Electricity market; Environmental economics; Demand response; Economics; Electricity retailing; Wind power; Fossil fuel; Value (mathematics); Microeconomics; Natural resource economics; Power (physics); Computer science","score_opus":0.018725988088020135,"score_gpt":0.2216664699903848,"score_spread":0.20294048190236466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080349679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34689012,0.0046652392,0.510502,0.0046122093,0.00029962798,0.00011454712,0.00048700123,0.00006285391,0.13236646],"genre_scores_gemma":[0.97923845,0.0011464189,0.008965964,0.00010140061,0.00006857857,0.000056013105,0.000037737806,0.000017779319,0.01036759],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996897,0.0001655181,0.0000055950068,0.000026911,0.000068492154,0.000043814623],"domain_scores_gemma":[0.99942446,0.00039101474,0.00006725641,0.000020193189,0.000064580876,0.00003245686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006919331,0.00055023,0.0004913194,0.0007164157,0.00056724565,0.002561291,0.0011122009,0.00097560417,0.0022147042],"category_scores_gemma":[0.0017118492,0.0003750417,0.00065630156,0.00075020496,0.0015602569,0.0021896022,0.0006627416,0.0013083047,0.000109874054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017363998,0.000029729441,0.0005077883,0.000036637302,0.000023423981,0.00024044041,0.000065416905,0.67850107,0.00033756808,0.31706718,0.00050575513,0.0026676613],"study_design_scores_gemma":[0.000014815227,0.00003075641,0.00068458385,0.000022257263,0.000013987942,0.000071765084,0.00013277605,0.81287247,0.00012943587,0.18390496,0.0021044798,0.00001765985],"about_ca_topic_score_codex":0.01020732,"about_ca_topic_score_gemma":0.0076738913,"teacher_disagreement_score":0.01020732,"about_ca_system_score_codex":0.0024825518,"about_ca_system_score_gemma":0.0011525732,"threshold_uncertainty_score":0.020295799},"labels":[],"label_agreement":null},{"id":"W2081324415","doi":"10.1080/00139157.2014.964092","title":"Building-Integrated Photovoltaics: Distributed Energy Development for Urban Sustainability","year":2014,"lang":"en","type":"article","venue":"Environment Science and Policy for Sustainable Development","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Concordia University; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Photovoltaics; Sustainability; Environmental science; Distributed generation; Photovoltaic system; Architectural engineering; Environmental economics; Business; Environmental planning; Renewable energy; Engineering; Electrical engineering; Economics; Ecology","score_opus":0.004861188504335193,"score_gpt":0.2067596618361659,"score_spread":0.2018984733318307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081324415","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002633164,0.00689375,0.037460353,0.005826528,0.0036931161,0.00025778307,0.0057974653,0.026847215,0.91059065],"genre_scores_gemma":[0.041544124,0.013242495,0.026206486,0.001709304,0.0023552633,0.00026004473,0.009031692,0.004828402,0.90082216],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9997439,0.000027200262,0.0000069918965,0.00003074226,0.0001622317,0.00002898793],"domain_scores_gemma":[0.9994679,0.000110664754,0.000029217306,0.000097803255,0.00017330909,0.00012111877],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00048632052,0.000728687,0.00037450506,0.0010190323,0.0004971275,0.0022416392,0.00093961443,0.00091612566,0.5398194],"category_scores_gemma":[0.001071692,0.0003204617,0.00042261503,0.001769779,0.00021688727,0.0029427526,0.0017697075,0.0010328641,0.22143729],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038703784,0.00003577201,0.00026114727,0.0002239481,0.00000557035,0.000037785005,0.00003687225,0.000360123,0.0017566156,0.003733068,0.7706055,0.22290489],"study_design_scores_gemma":[0.000025358793,0.000028943065,0.00074315496,0.000106833155,0.0000067178225,0.000108626424,0.000043787408,0.00095551973,0.0011675901,0.0033988976,0.99340254,0.000012105916],"about_ca_topic_score_codex":0.00090067746,"about_ca_topic_score_gemma":0.0023912655,"teacher_disagreement_score":0.5398194,"about_ca_system_score_codex":0.00043060514,"about_ca_system_score_gemma":0.0003868127,"threshold_uncertainty_score":0.65639174},"labels":[],"label_agreement":null},{"id":"W2081666512","doi":"10.1109/pesmg.2013.6672552","title":"Demand response potential of water heaters to mitigate minimum generation conditions","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Demand response; Electricity; Renewable energy; Electricity generation; Greenhouse gas; Base load power plant; Work (physics); Environmental science; Water heating; Greenhouse; Environmental economics; Computer science; Automotive engineering; Engineering; Power (physics); Economics; Waste management; Electrical engineering; Distributed generation; Mechanical engineering","score_opus":0.006626892304529815,"score_gpt":0.18935528981471528,"score_spread":0.18272839751018546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081666512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88298035,0.00039612298,0.09606549,0.0005633915,0.000081993814,0.0001069911,0.00017610016,0.0012066106,0.01842303],"genre_scores_gemma":[0.99549603,0.000048026184,0.003244768,0.000029724422,0.0000070627484,0.000012444071,0.000033481123,0.000015121985,0.0011133607],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997454,0.00007639652,0.000008421923,0.00004104684,0.00007415007,0.00005449753],"domain_scores_gemma":[0.99958414,0.000174526,0.000051824456,0.0000405639,0.00012717358,0.000021761483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044422474,0.0003195111,0.00022612196,0.00022573552,0.00021191829,0.00046800566,0.0005402721,0.00032093283,0.0019118895],"category_scores_gemma":[0.00076082355,0.00015515521,0.00019348381,0.00013463116,0.00018388694,0.0007314382,0.00035473888,0.0003085151,0.00042082646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016125706,0.00061639724,0.027434228,0.00051497814,0.00009792126,0.00056491734,0.0005790433,0.1780607,0.49650976,0.0043802015,0.003937939,0.2856913],"study_design_scores_gemma":[0.000103332386,0.001784666,0.021116292,0.00004215394,0.000084187086,0.00031781362,0.0011212485,0.51139253,0.44010237,0.0027668695,0.021076983,0.00009152255],"about_ca_topic_score_codex":0.0014752883,"about_ca_topic_score_gemma":0.002561006,"teacher_disagreement_score":0.0019118895,"about_ca_system_score_codex":0.00031690637,"about_ca_system_score_gemma":0.0002460064,"threshold_uncertainty_score":0.0063958764},"labels":[],"label_agreement":null},{"id":"W2084067034","doi":"10.1109/tsg.2014.2331175","title":"A Monte Carlo Simulation Platform for Studying Low Voltage Residential Networks","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Monte Carlo method; Smart grid; Demand response; Computer science; Simulation; Voltage; Grid; Engineering; Reliability engineering; Electricity; Electrical engineering","score_opus":0.016092344985819594,"score_gpt":0.2235146231287392,"score_spread":0.2074222781429196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084067034","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06451892,0.0001151595,0.91748494,0.00019187146,0.00005830553,0.00025059146,0.000463341,0.0021181125,0.014798836],"genre_scores_gemma":[0.6558865,0.00028762943,0.33795545,0.00006419374,0.000034374756,0.0007035557,0.0005717121,0.00023095193,0.0042657144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996768,0.00014053295,0.000015773889,0.000032515283,0.00010496713,0.00002946287],"domain_scores_gemma":[0.9990627,0.0005806671,0.00007135172,0.00010390281,0.00013574776,0.00004566963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008082469,0.00051489234,0.0005295552,0.000450401,0.0004741403,0.0005871094,0.00090752414,0.00072764634,0.004386054],"category_scores_gemma":[0.0020261884,0.00031544172,0.00050243177,0.00050737656,0.00040301427,0.00053724414,0.00047239623,0.0009259512,0.00047345136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025048299,0.000034378965,0.00036213212,0.000014283052,0.0000091078855,0.000029862182,0.000017999646,0.9865671,0.00095805863,0.007695887,0.0003512093,0.0039350325],"study_design_scores_gemma":[0.0000042790166,0.000007726096,0.000035729565,0.0000011026367,0.0000014234791,0.0000037794687,0.0000017776206,0.9984787,0.00026154213,0.000710003,0.000492335,0.0000015412248],"about_ca_topic_score_codex":0.0077655097,"about_ca_topic_score_gemma":0.005448887,"teacher_disagreement_score":0.0077655097,"about_ca_system_score_codex":0.00061436946,"about_ca_system_score_gemma":0.0010703646,"threshold_uncertainty_score":0.015440583},"labels":[],"label_agreement":null},{"id":"W2084849953","doi":"10.1109/iembs.2011.6091313","title":"Usage monitoring of electrical devices in a smart home","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electrical load; Computer science; Signature (topology); Mahalanobis distance; Power consumption; Electrical equipment; Home automation; Electric power; Key (lock); Real-time computing; Waveform; Electrical engineering; Power (physics); Voltage; Artificial intelligence; Engineering; Telecommunications; Computer security","score_opus":0.021216463346834614,"score_gpt":0.2027843280785779,"score_spread":0.1815678647317433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084849953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8533824,0.00027276136,0.13994898,0.000117971664,0.000032755488,0.000047052617,0.00038133343,0.0016971183,0.0041195718],"genre_scores_gemma":[0.9873029,0.000083403276,0.011255653,0.000019767363,0.0000068549316,0.000016488693,0.00016602356,0.000015573038,0.0011333794],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99977344,0.000045681114,0.000013772136,0.00005242413,0.000099886594,0.000014733709],"domain_scores_gemma":[0.99978894,0.000058520116,0.000039593557,0.00005001578,0.000051658455,0.000011365771],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014013708,0.0002998704,0.00044944737,0.00069035264,0.00014576525,0.000358499,0.00028226594,0.00036057716,0.0009503446],"category_scores_gemma":[0.0005352719,0.00011064958,0.00016142969,0.0005218683,0.00012206676,0.00061768206,0.0002208825,0.00016275753,0.00063092826],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007448718,0.00042979454,0.08489218,0.00026935502,0.00011771974,0.00067660614,0.00036809233,0.057220683,0.16741127,0.0012481419,0.003044118,0.68357724],"study_design_scores_gemma":[0.0000276646,0.00044809582,0.09927059,0.000040691368,0.000058234244,0.0014683062,0.00028627578,0.8143279,0.07802852,0.0019208707,0.0040757703,0.000047023495],"about_ca_topic_score_codex":0.0006075771,"about_ca_topic_score_gemma":0.0009885993,"teacher_disagreement_score":0.0009503446,"about_ca_system_score_codex":0.00014402071,"about_ca_system_score_gemma":0.00009152812,"threshold_uncertainty_score":0.0031791925},"labels":[],"label_agreement":null},{"id":"W2085018292","doi":"10.1016/j.energy.2014.01.099","title":"An inexact two-stage stochastic robust programming for residential micro-grid management-based on random demand","year":2014,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"China Scholarship Council","keywords":"Robustness (evolution); Stochastic programming; Robust optimization; Grid; Mathematical optimization; Demand response; Computer science; Linear programming; Smart grid; Stochastic optimization; Investment (military); Interval (graph theory); Electricity; Reliability engineering; Operations research; Engineering; Mathematics; Electrical engineering","score_opus":0.007618417349255408,"score_gpt":0.21325967829193218,"score_spread":0.20564126094267676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085018292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0109756,0.00017804388,0.9856478,0.00022708745,0.00006493569,0.000048563117,0.000061931816,0.00015614474,0.002639928],"genre_scores_gemma":[0.89696723,0.00031085967,0.0941384,0.00016415714,0.00009476481,0.00025190174,0.00019438172,0.00012640422,0.0077519286],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989618,0.00038438785,0.000041788084,0.00023569446,0.00023069089,0.0001456736],"domain_scores_gemma":[0.99828845,0.001093668,0.0001636942,0.000071443304,0.0002979298,0.00008464803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025099649,0.0012782289,0.0026862298,0.0004393811,0.00046452513,0.0016776905,0.001653129,0.0021940062,0.0040292866],"category_scores_gemma":[0.0036754396,0.001065765,0.0012902907,0.0006007348,0.0011785788,0.0013208883,0.0019630287,0.0019407914,0.00030529362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000438687,0.000018596942,0.00010028715,0.00004284243,0.000017653198,0.00003251441,0.00001508936,0.9917108,0.00024781545,0.0037094697,0.0003180254,0.0037429784],"study_design_scores_gemma":[0.0000025389215,0.000009367247,0.000015785019,0.0000014394528,0.0000024643507,0.0000019731622,0.0000015434578,0.99952877,0.00004009858,0.00034558913,0.000048576694,0.000001746147],"about_ca_topic_score_codex":0.0102628125,"about_ca_topic_score_gemma":0.0073585743,"teacher_disagreement_score":0.0102628125,"about_ca_system_score_codex":0.0011735505,"about_ca_system_score_gemma":0.0022046547,"threshold_uncertainty_score":0.020406187},"labels":[],"label_agreement":null},{"id":"W2086749039","doi":"10.1145/2602044.2602076","title":"Predicting peak-demand days in the ontario peak reduction program for large consumers","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Peak demand; Leverage (statistics); Peak load; Context (archaeology); Heuristic; Reduction (mathematics); Electricity; Computer science; Demand reduction; Econometrics; Simulation; Economics; Mathematics; Engineering; Electrical engineering; Geography; Automotive engineering; Machine learning; Medicine; Artificial intelligence","score_opus":0.00928485334803083,"score_gpt":0.2147474638159696,"score_spread":0.20546261046793876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086749039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9246344,0.0002700272,0.062279005,0.0008280945,0.000033467215,0.00015887166,0.0036595862,0.0012445915,0.006891961],"genre_scores_gemma":[0.9751032,0.00007015197,0.020604437,0.00004403365,0.0000129750515,0.000023726388,0.0023204603,0.00003956746,0.0017814446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983776,0.000013675813,0.0000062184276,0.00004916224,0.000042375006,0.000050782066],"domain_scores_gemma":[0.9996654,0.00010093233,0.000043548782,0.000019875453,0.00011658727,0.000053767977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021855463,0.0005008648,0.00036428883,0.00056408136,0.00076285715,0.00064113067,0.0009932636,0.00032903126,0.0013497216],"category_scores_gemma":[0.0011532151,0.00026546256,0.00020495667,0.0008521695,0.00020683464,0.00044386153,0.00031769046,0.0003727674,0.00020801632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038472805,0.00016455799,0.10174237,0.00008869858,0.00007024261,0.0002919743,0.000350797,0.7826489,0.002995628,0.0020282802,0.013078002,0.09615574],"study_design_scores_gemma":[0.000009388129,0.000012635096,0.0124989925,0.000003628764,0.0000069731527,0.000017092807,0.00015254525,0.9852578,0.0004328854,0.0006759089,0.00092367944,0.000008510262],"about_ca_topic_score_codex":0.6593485,"about_ca_topic_score_gemma":0.79798603,"teacher_disagreement_score":0.3406515,"about_ca_system_score_codex":0.0037903395,"about_ca_system_score_gemma":0.0047225608,"threshold_uncertainty_score":0.6853154},"labels":[],"label_agreement":null},{"id":"W2088685155","doi":"10.1016/j.wasman.2008.07.008","title":"Status and prospects of pay-as-you-throw in Europe – A review of pilot research and implementation studies","year":2008,"lang":"en","type":"review","venue":"Waste Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intecsea (Canada)","funders":"","keywords":"Incentive; Situational ethics; Meaning (existential); Order (exchange); Scale (ratio); Engineering; Environmental economics; Business; Political science; Economics; Finance; Law; Psychology; Geography","score_opus":0.10576770145747239,"score_gpt":0.39374731842400795,"score_spread":0.28797961696653557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2088685155","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001165558,0.99568874,0.00023229582,0.0013891429,0.00015975707,0.00001813164,0.00003807112,0.000006012729,0.0013022756],"genre_scores_gemma":[0.012217381,0.9856719,0.00068781414,0.0008505153,0.00012233341,0.000032662974,0.000044020548,0.0000041778235,0.00036915077],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99750996,0.00085187296,0.00035042243,0.00037665843,0.0006790331,0.00023208903],"domain_scores_gemma":[0.9930568,0.0048802523,0.0009510029,0.000107111046,0.0007772418,0.00022762551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01029462,0.0007349454,0.0029062487,0.0025686705,0.00050511677,0.0036496643,0.0019948655,0.0024922607,0.0053593726],"category_scores_gemma":[0.008734304,0.0004024624,0.0011773866,0.0071410104,0.0014638884,0.003208994,0.0011961961,0.0013113131,0.00065730023],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035185472,0.00021755623,0.0013805755,0.028688848,0.0002007876,0.000101828075,0.0001506511,0.0008253496,0.0002652872,0.010800002,0.005435165,0.9515821],"study_design_scores_gemma":[0.00038424623,0.0016188683,0.019791247,0.1164353,0.0017538262,0.0013352768,0.002614503,0.0009612365,0.0016159437,0.0126665365,0.84067816,0.00014476904],"about_ca_topic_score_codex":0.004624926,"about_ca_topic_score_gemma":0.0067326985,"teacher_disagreement_score":0.01029462,"about_ca_system_score_codex":0.0025604665,"about_ca_system_score_gemma":0.010369126,"threshold_uncertainty_score":0.054443777},"labels":[],"label_agreement":null},{"id":"W2091120919","doi":"10.1109/tsg.2012.2224677","title":"Optimizations of Power Consumption and Supply in the Smart Grid: Analysis of the Impact of Data Communication Reliability","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Unavailability; Smart grid; Computer science; Markov decision process; Scheduling (production processes); Economic dispatch; Software deployment; Reliability engineering; Demand response; Redundancy (engineering); Grid; Reliability (semiconductor); Distributed computing; Markov process; Electric power system; Electricity; Power (physics); Engineering","score_opus":0.021991425731879947,"score_gpt":0.2599237253055856,"score_spread":0.23793229957370565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091120919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35090023,0.0009818814,0.63469875,0.0009608661,0.00006001188,0.00008986522,0.00017275682,0.0002234627,0.011912105],"genre_scores_gemma":[0.98987657,0.00019832932,0.008712474,0.00002132619,0.000011910203,0.000019427127,0.000020694037,0.000033895896,0.0011054153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994979,0.00020374589,0.000011430063,0.00005576587,0.00013361052,0.00009757747],"domain_scores_gemma":[0.9981185,0.0013471596,0.00020867705,0.00009039065,0.0001840387,0.0000511917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010892972,0.0006163997,0.0006815357,0.00029458222,0.00024209546,0.0007186606,0.00045931223,0.00052910135,0.0014331329],"category_scores_gemma":[0.003992902,0.00039766397,0.00037104555,0.00045995569,0.00062011194,0.0011907927,0.00041100505,0.0005816225,0.00010796357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030571027,0.000011213445,0.00021455063,0.000020534735,0.0000072394196,0.000030417648,0.000009134864,0.9910987,0.00097439345,0.0043540685,0.00014051987,0.0031086202],"study_design_scores_gemma":[0.0000029997286,0.000017373528,0.00013957101,0.0000017011865,0.000004312928,0.0000060188245,0.0000068647714,0.9978498,0.00040210845,0.0014842727,0.00008323784,0.0000017669224],"about_ca_topic_score_codex":0.0047137025,"about_ca_topic_score_gemma":0.0029957956,"teacher_disagreement_score":0.0047137025,"about_ca_system_score_codex":0.0010403591,"about_ca_system_score_gemma":0.0009825765,"threshold_uncertainty_score":0.009372532},"labels":[],"label_agreement":null},{"id":"W2091123125","doi":"10.1109/jsac.2014.2332011","title":"Guest Editorial for the Special Series on Smart Grid Communications","year":2014,"lang":"en","type":"editorial","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Computer science; Special section; Demand response; Grid; Telecommunications; Energy management; Load management; Range (aeronautics); Distributed computing; Computer security; Electrical engineering; Electricity; Energy (signal processing); Engineering","score_opus":0.018704461401902,"score_gpt":0.2691460952647464,"score_spread":0.2504416338628444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091123125","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000035213325,0.0022032405,0.00013367593,0.015762175,0.9794335,0.00001539827,0.00003501872,0.000040855884,0.0023409007],"genre_scores_gemma":[0.00039406578,0.002916457,0.0000976599,0.008298895,0.97309804,0.000015512074,0.00003787962,0.00003735407,0.015104168],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974528,0.00027908853,0.00026218194,0.00040634806,0.0013487499,0.00025084277],"domain_scores_gemma":[0.9905812,0.0017734481,0.0006445087,0.00027044522,0.004720093,0.0020103448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027632918,0.003179251,0.002438147,0.0028216548,0.002205069,0.0061850827,0.0020535588,0.0076619107,0.023068462],"category_scores_gemma":[0.009848554,0.00080424035,0.0020196154,0.0012402631,0.0012626005,0.0031307004,0.001201794,0.013593649,0.019751221],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002447638,0.000014061717,0.000028766635,0.00008083282,0.000007652072,0.000099259414,0.0000046551622,0.000033696004,0.00007372079,0.00027210818,0.9937774,0.005583481],"study_design_scores_gemma":[0.000034514316,0.00004157575,0.00029670392,0.00018281366,0.000024821069,0.00029637472,0.00002467201,0.00018697932,0.00015660656,0.0008828783,0.9978568,0.00001540151],"about_ca_topic_score_codex":0.0008305392,"about_ca_topic_score_gemma":0.0025043183,"teacher_disagreement_score":0.023068462,"about_ca_system_score_codex":0.001873273,"about_ca_system_score_gemma":0.0019491824,"threshold_uncertainty_score":0.07717168},"labels":[],"label_agreement":null},{"id":"W2091733411","doi":"10.5540/03.2013.001.01.0202","title":"Proposta de algoritmo para gerenciamento pelo lado demanda em residências através do corte de smart plugs","year":2013,"lang":"pt","type":"article","venue":"Proceeding Series of the Brazilian Society of Computational and Applied Mathematics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"The Audio Recording Academy","funders":"","keywords":"Humanities; Physics; Computer science; Art","score_opus":0.01177452349026389,"score_gpt":0.2155931663208448,"score_spread":0.2038186428305809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091733411","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15412839,0.006555083,0.7946955,0.0018955584,0.00079331227,0.0005747801,0.00046646877,0.0067309085,0.034159943],"genre_scores_gemma":[0.8142599,0.002610806,0.15606761,0.00047631722,0.0001553164,0.00028524917,0.00033924158,0.00024956226,0.025555944],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989203,0.00019556619,0.00008161428,0.00023587963,0.00044646978,0.000120209384],"domain_scores_gemma":[0.99915147,0.00019134744,0.00007593752,0.00011760132,0.00041852635,0.000045084136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009011839,0.0009372293,0.00070435094,0.0009138932,0.0006341309,0.0024780333,0.0020941792,0.0012571017,0.004200594],"category_scores_gemma":[0.0016382984,0.00048933184,0.00070504635,0.00065084593,0.00047474433,0.0023950783,0.0006896996,0.0006568115,0.0017942906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014130201,0.0004379284,0.009498496,0.0022820511,0.00023307517,0.0016703217,0.0013166167,0.039963093,0.29497027,0.020154234,0.013326436,0.6147344],"study_design_scores_gemma":[0.00019569616,0.002037839,0.009826315,0.00040302562,0.0007780578,0.0025949115,0.0017278272,0.4452343,0.32109022,0.012170703,0.20368938,0.00025160928],"about_ca_topic_score_codex":0.0027058958,"about_ca_topic_score_gemma":0.0036459332,"teacher_disagreement_score":0.004200594,"about_ca_system_score_codex":0.00066945987,"about_ca_system_score_gemma":0.0007734582,"threshold_uncertainty_score":0.014052451},"labels":[],"label_agreement":null},{"id":"W2093828799","doi":"10.1109/tsg.2014.2376291","title":"Nonparametric Demand Forecasting and Detection of Energy Aware Consumers","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Nonparametric statistics; Demand response; Computer science; Demand forecasting; Econometrics; Tariff; Smart grid; Economics; Demand management; Electricity; Mathematical optimization; Operations research; Engineering; Mathematics","score_opus":0.011069574317226136,"score_gpt":0.18439256141545818,"score_spread":0.17332298709823205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093828799","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7408028,0.00008645527,0.25536138,0.0004892908,0.00002266883,0.000024479548,0.0002890033,0.00031815722,0.0026057572],"genre_scores_gemma":[0.99431795,0.000013167339,0.0052569946,0.000016231203,0.0000069821117,0.0000070532396,0.0001093906,0.000006362738,0.0002658563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929345,0.0003097729,0.000033281274,0.00012929027,0.00015075816,0.000083409795],"domain_scores_gemma":[0.9925823,0.005160227,0.0010344236,0.0005295705,0.00057513756,0.00011833948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018944768,0.00028315998,0.0005057308,0.00059828034,0.00022080731,0.00058256375,0.00075473863,0.00072703086,0.00087429606],"category_scores_gemma":[0.014078485,0.00020336667,0.00028975643,0.0006068936,0.000550997,0.0010082676,0.0005565266,0.000765804,0.00014097865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009940362,0.00028363077,0.13613784,0.00007457817,0.00009362142,0.00039620162,0.0002289329,0.7094907,0.0052569294,0.024143236,0.0019431969,0.12095701],"study_design_scores_gemma":[0.0000065347285,0.000028030314,0.0070491056,0.0000022981426,0.0000029222854,0.00003930151,0.000032215652,0.98702675,0.00058857026,0.0050925124,0.00012216103,0.000009631801],"about_ca_topic_score_codex":0.004398839,"about_ca_topic_score_gemma":0.0036995802,"teacher_disagreement_score":0.004398839,"about_ca_system_score_codex":0.0005561506,"about_ca_system_score_gemma":0.00042901008,"threshold_uncertainty_score":0.010019064},"labels":[],"label_agreement":null},{"id":"W2093837586","doi":"10.1016/j.eneco.2012.04.009","title":"Transportation and storage under a dynamic price cap regulation process","year":2012,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Stylized fact; Economics; Microeconomics; Process (computing); Dynamic pricing; Sequential game; Price setting; Mechanism (biology); Welfare; Game theory; Computer science; Macroeconomics; Market economy","score_opus":0.004636631692598834,"score_gpt":0.1747152805954703,"score_spread":0.17007864890287147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093837586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46262673,0.0008318782,0.4128174,0.014992567,0.0010000835,0.0003406897,0.0024242806,0.0011243405,0.10384203],"genre_scores_gemma":[0.98040855,0.00015129802,0.0031266958,0.00016899098,0.00009401146,0.00004047715,0.00008303384,0.000037493875,0.015889402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983492,0.00054829184,0.00006147559,0.0003545708,0.00029005815,0.0003963377],"domain_scores_gemma":[0.99548954,0.0028051445,0.00059983495,0.00028861122,0.0006365389,0.00018030283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026454043,0.00085255574,0.0018938358,0.0007244819,0.0009875511,0.004607361,0.0019569704,0.0034975638,0.009194675],"category_scores_gemma":[0.00829909,0.00093612407,0.0010813252,0.00092209276,0.002367591,0.004305739,0.0015052647,0.0026844607,0.0008524294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007414868,0.00019352572,0.0008061492,0.00010663406,0.000066507724,0.00078747555,0.000079864694,0.706261,0.0033989043,0.273273,0.004468336,0.009817064],"study_design_scores_gemma":[0.00006138546,0.000062987565,0.00049724337,0.000008591921,0.00003490001,0.00007368868,0.00006554451,0.93565786,0.0008429943,0.061867725,0.00079266104,0.000034507364],"about_ca_topic_score_codex":0.011409014,"about_ca_topic_score_gemma":0.0062010684,"teacher_disagreement_score":0.011409014,"about_ca_system_score_codex":0.0031614464,"about_ca_system_score_gemma":0.0021185966,"threshold_uncertainty_score":0.030759215},"labels":[],"label_agreement":null},{"id":"W2095043632","doi":"10.1109/tvt.2014.2313604","title":"Green Cognitive Mobile Networks With Small Cells for Multimedia Communications in the Smart Grid Environment","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Vehicular Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Huawei Technologies (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Computer science; Stackelberg competition; Cognitive radio; Efficient energy use; Distributed computing; Computer network; Multimedia; Telecommunications; Engineering; Wireless; Electrical engineering","score_opus":0.010113145054258095,"score_gpt":0.19351910347798115,"score_spread":0.18340595842372306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095043632","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0834715,0.0033766082,0.90110683,0.0009769935,0.00028812652,0.00012129625,0.000060043072,0.00018744638,0.010411146],"genre_scores_gemma":[0.9531922,0.0023736581,0.03937159,0.00033008875,0.000178023,0.00010362048,0.000025325091,0.000014357926,0.004411104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996997,0.00010473454,0.0000059590775,0.00004204124,0.00008271613,0.00006491002],"domain_scores_gemma":[0.9995983,0.00022770489,0.000048871665,0.00002990743,0.00006654328,0.000028790731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047246448,0.0005054797,0.00040926755,0.00034415562,0.00049146294,0.0008651068,0.0007701971,0.0006423618,0.001176813],"category_scores_gemma":[0.0009710042,0.00015309382,0.0004841683,0.000506381,0.0006684503,0.0009680534,0.0005048946,0.0006461663,0.00020234213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029024514,0.00023882804,0.001397165,0.00023517963,0.000086977554,0.00093978056,0.0003728025,0.66857153,0.02796954,0.18827525,0.0061981142,0.105424546],"study_design_scores_gemma":[0.000011956549,0.000090996335,0.00024041129,0.00001186339,0.00002773927,0.00008250459,0.00007666534,0.97409546,0.0017236852,0.02028493,0.0033379886,0.000015792431],"about_ca_topic_score_codex":0.005074538,"about_ca_topic_score_gemma":0.006839812,"teacher_disagreement_score":0.005074538,"about_ca_system_score_codex":0.0010925865,"about_ca_system_score_gemma":0.0007033739,"threshold_uncertainty_score":0.0100899935},"labels":[],"label_agreement":null},{"id":"W2100280406","doi":"10.1109/tpwrs.2007.901485","title":"Customer-Owned Back-Up Generators for Energy Management by Distribution Utilities","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Load management; Energy management; Electricity generation; Electricity market; Market penetration; Computer science; Distributed generation; Reciprocating motion; Automotive engineering; Operations research; Business; Environmental economics; Industrial organization; Engineering; Economics; Electrical engineering; Renewable energy; Energy (signal processing); Power (physics)","score_opus":0.0077145261126909965,"score_gpt":0.1983987373152646,"score_spread":0.19068421120257362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100280406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6927709,0.0044401903,0.12532432,0.0013473945,0.00018806085,0.00026295127,0.0012602656,0.00040817013,0.17399776],"genre_scores_gemma":[0.9860205,0.00039439628,0.008661804,0.00006655605,0.000026895643,0.000040217154,0.00019922222,0.00002850143,0.004561832],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983267,0.00066334393,0.000022046284,0.00007758013,0.00079891906,0.0001114551],"domain_scores_gemma":[0.9970945,0.001348572,0.00035702673,0.0003314165,0.0007803972,0.00008796222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008348393,0.00052258186,0.00029095504,0.00067579164,0.0003891295,0.0011288868,0.0003959349,0.00039839192,0.004748227],"category_scores_gemma":[0.0032788883,0.0001238156,0.00025041777,0.0009882428,0.00032481903,0.0016336394,0.00075224444,0.0005566982,0.0004782483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007273413,0.0005214337,0.079899795,0.00058547664,0.00023271613,0.0005839424,0.00060485984,0.23989323,0.009659668,0.1537139,0.01372202,0.4998556],"study_design_scores_gemma":[0.000108891836,0.0016639015,0.19978692,0.0003824777,0.00043519947,0.0011201899,0.0017965588,0.5478446,0.030974405,0.09807995,0.11764653,0.0001605131],"about_ca_topic_score_codex":0.0024060567,"about_ca_topic_score_gemma":0.010521458,"teacher_disagreement_score":0.004748227,"about_ca_system_score_codex":0.0012968546,"about_ca_system_score_gemma":0.000731701,"threshold_uncertainty_score":0.0158844},"labels":[],"label_agreement":null},{"id":"W2101463878","doi":"10.1080/23744731.2015.1072455","title":"Demonstration of HVAC chiller control for power grid frequency regulation—Part 2: Discussion of results and considerations for broader deployment","year":2015,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Division of Emerging Frontiers in Research and Innovation; Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"HVAC; Chiller; Controller (irrigation); Frequency regulation; Grid; Automotive engineering; Automatic frequency control; Gas compressor; Engineering; Reliability engineering; Power (physics); Control engineering; Air conditioning; Computer science; Electric power system; Electrical engineering; Mechanical engineering","score_opus":0.016118337004329412,"score_gpt":0.2161259732201136,"score_spread":0.20000763621578418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101463878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8531357,0.0006718819,0.11311973,0.0012014451,0.00030859341,0.0010813423,0.0006617032,0.0026914943,0.027128164],"genre_scores_gemma":[0.9784873,0.0002025445,0.017387532,0.000093103095,0.000017653201,0.0001519157,0.00016453706,0.000056033423,0.00343943],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99937856,0.00014702482,0.000029734674,0.000097623895,0.00025857557,0.00008843225],"domain_scores_gemma":[0.9992143,0.00022033387,0.00004739258,0.00018346802,0.00026680037,0.000067697954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010805901,0.0005121856,0.00046245672,0.00028515258,0.0005890277,0.0009570495,0.0011562179,0.0008090582,0.005377134],"category_scores_gemma":[0.0011789134,0.00017910532,0.00051334716,0.00023694387,0.00058041885,0.00081126654,0.0005312243,0.0012594566,0.00061501656],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022686506,0.0036291794,0.008978799,0.0010222328,0.000113004295,0.00063149614,0.00046190407,0.042263467,0.77842104,0.0057706493,0.0051016025,0.15133788],"study_design_scores_gemma":[0.00045847456,0.007462266,0.013098465,0.00005433513,0.000049162147,0.00033123157,0.00026171407,0.056551594,0.9056544,0.0009609434,0.015035634,0.00008185478],"about_ca_topic_score_codex":0.0046706544,"about_ca_topic_score_gemma":0.0031604774,"teacher_disagreement_score":0.005377134,"about_ca_system_score_codex":0.0006898393,"about_ca_system_score_gemma":0.00071671203,"threshold_uncertainty_score":0.017988324},"labels":[],"label_agreement":null},{"id":"W2102208073","doi":"","title":"Microgrids: An emerging paradigm for meeting building electricity and heat requirements efficiently and with appropriate energy quality","year":2007,"lang":"en","type":"article","venue":"University of North Texas Digital Library (University of North Texas)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory; National Technical University of Athens; National and Kapodistrian University of Athens; Office of Electricity; University of Toronto; California Energy Commission; U.S. Department of Energy","keywords":"Paradigm shift; Electricity; Renewable energy; Electricity generation; Grid; Service (business); Quality (philosophy); Environmental economics; Software deployment; Computer science; Architectural engineering; Systems engineering; Engineering; Electrical engineering; Power (physics); Economics; Economy","score_opus":0.0107491694159363,"score_gpt":0.18567965291423044,"score_spread":0.17493048349829415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102208073","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04772944,0.049850892,0.71818197,0.023561494,0.0035473462,0.00039729514,0.0011259438,0.0044398727,0.15116584],"genre_scores_gemma":[0.4755118,0.082003586,0.35599688,0.0058661667,0.00441842,0.0005243282,0.0027041463,0.0007325211,0.07224222],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942636,0.00011961736,0.000029550309,0.00009869182,0.00025698578,0.00006881695],"domain_scores_gemma":[0.9995914,0.00007112608,0.0000463958,0.00008322241,0.000101591075,0.00010629821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079243904,0.00066703756,0.00057663565,0.0004848234,0.0006317526,0.0027482077,0.0019556195,0.0010142144,0.0077219787],"category_scores_gemma":[0.00063771434,0.0002831576,0.0003944859,0.0011200593,0.00089385145,0.0043010726,0.0033376096,0.0013823305,0.0021649483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016633364,0.00015268526,0.002419041,0.002590119,0.000122357,0.0004783714,0.0009226629,0.023000263,0.025981288,0.36115664,0.09832111,0.48468915],"study_design_scores_gemma":[0.000035186087,0.00016042362,0.001200538,0.00033488058,0.000042152777,0.0006732928,0.000955811,0.03169837,0.0037082136,0.10766191,0.85346246,0.000066713474],"about_ca_topic_score_codex":0.0012568526,"about_ca_topic_score_gemma":0.0019337208,"teacher_disagreement_score":0.0077219787,"about_ca_system_score_codex":0.0007890276,"about_ca_system_score_gemma":0.0013393792,"threshold_uncertainty_score":0.025832653},"labels":[],"label_agreement":null},{"id":"W2102640484","doi":"10.1109/pes.2008.4596384","title":"Concept of Best Energy Transfer Scenario and a True Expression for Power Factor","year":2008,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Lossless compression; Maximum power transfer theorem; Computer science; Line (geometry); Point (geometry); Power (physics); Transfer (computing); Transmission line; Electric power transmission; Energy (signal processing); Value (mathematics); Power factor; Transmission (telecommunications); Index (typography); Reliability engineering; Mathematical optimization; Electrical engineering; Algorithm; Mathematics; Telecommunications; Engineering; Statistics; Physics; Data compression","score_opus":0.013582362716289886,"score_gpt":0.18936519108354438,"score_spread":0.1757828283672545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102640484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00831791,0.0017222277,0.93105465,0.0025025173,0.00040206328,0.00006534227,0.00024261534,0.00014097706,0.05555168],"genre_scores_gemma":[0.7503756,0.0033260165,0.23018886,0.0010301244,0.00086307543,0.00061126665,0.00032069389,0.00019413522,0.013090159],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9962166,0.0015747694,0.00020728073,0.0007061908,0.0010202822,0.00027493513],"domain_scores_gemma":[0.99755895,0.001159358,0.0003898504,0.00037770264,0.0004341251,0.000079957055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037146765,0.0012998675,0.00085259875,0.002307246,0.000836029,0.004225843,0.001948011,0.0028712663,0.005805779],"category_scores_gemma":[0.010078429,0.00040187887,0.00077563344,0.002484456,0.0048832525,0.010742528,0.0018103255,0.0032738862,0.0011910672],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014772452,0.000008442309,0.00008884222,0.00003894715,0.000006929317,0.000056428107,0.000059286864,0.016181694,0.00034703416,0.9740555,0.0014556132,0.007686462],"study_design_scores_gemma":[0.000009096342,0.000041727693,0.00014476132,0.000072138675,0.000009490181,0.0003476094,0.00008141644,0.069829494,0.0008469519,0.9097026,0.018880405,0.0000343258],"about_ca_topic_score_codex":0.0004376257,"about_ca_topic_score_gemma":0.00027515658,"teacher_disagreement_score":0.005805779,"about_ca_system_score_codex":0.0017449346,"about_ca_system_score_gemma":0.0007966176,"threshold_uncertainty_score":0.019645333},"labels":[],"label_agreement":null},{"id":"W2103185317","doi":"10.1049/cp.2013.1023","title":"Optimization model for the energy supply in city quarters","year":2013,"lang":"en","type":"article","venue":"22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Bundesministerium für Wirtschaft und Technologie","keywords":"Investment (military); Electricity; Environmental economics; Photovoltaic system; Quarter (Canadian coin); Work (physics); Energy supply; Order (exchange); Load shifting; Supply and demand; Mains electricity; Distributed generation; Energy consumption; Computer science; Energy (signal processing); Economics; Microeconomics; Engineering; Renewable energy; Electrical engineering; Finance; Mechanical engineering","score_opus":0.017533753198245523,"score_gpt":0.21602539417382152,"score_spread":0.198491640975576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103185317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13754018,0.0016283834,0.74338996,0.0031874008,0.00031859524,0.00022297983,0.0048812944,0.0006237638,0.10820742],"genre_scores_gemma":[0.90789425,0.0008767136,0.02802822,0.00022805548,0.00007088003,0.00036081052,0.0012170959,0.00013999225,0.061183956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994548,0.0002190229,0.00001740592,0.0001316746,0.00007134012,0.00010570589],"domain_scores_gemma":[0.99960774,0.0001950198,0.00006362199,0.000018390112,0.00007760815,0.00003764413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071733654,0.0009989524,0.001069616,0.0005394287,0.0005319681,0.0020490657,0.0014127843,0.0016993289,0.013937167],"category_scores_gemma":[0.0014760315,0.0006630361,0.0010195698,0.0013156183,0.00075669785,0.0010919612,0.0011724388,0.001398053,0.0012330161],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042980664,0.000018128052,0.00029204506,0.000033187967,0.000019678077,0.000069408605,0.000024349149,0.9778537,0.00025752373,0.018236002,0.0010633329,0.0020896855],"study_design_scores_gemma":[0.0000148189165,0.000017697737,0.00021453397,0.0000048127185,0.000009214999,0.000012684094,0.000028729986,0.9921158,0.000058041423,0.005991574,0.0015259982,0.0000060215466],"about_ca_topic_score_codex":0.02068524,"about_ca_topic_score_gemma":0.013031764,"teacher_disagreement_score":0.02068524,"about_ca_system_score_codex":0.0021701325,"about_ca_system_score_gemma":0.0014473784,"threshold_uncertainty_score":0.04662448},"labels":[],"label_agreement":null},{"id":"W2106458740","doi":"10.1145/2208828.2208856","title":"An analysis of peak demand reductions due to elasticity of domestic appliances","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Duration (music); Elasticity (physics); Price elasticity of demand; Peak demand; Power demand; Dynamic demand; Computer science; Load management; Peak load; Automotive engineering; Reliability engineering; Environmental science; Power (physics); Engineering; Economics; Electrical engineering; Electricity; Microeconomics; Power consumption; Materials science","score_opus":0.009260906152758657,"score_gpt":0.24576036170248905,"score_spread":0.2364994555497304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106458740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98829997,0.00007092658,0.0035253013,0.00008209874,0.0000030252988,0.000017464217,0.00049981795,0.00006519044,0.00743617],"genre_scores_gemma":[0.99889684,0.000024520557,0.0003830404,0.000007727746,0.0000014731835,0.000005108513,0.00015128615,0.0000053413746,0.0005246858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9997632,0.00005010415,0.0000043873433,0.000027865812,0.00006938118,0.00008511436],"domain_scores_gemma":[0.9994179,0.00030005802,0.0000716816,0.00005183378,0.00013290545,0.000025589543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029437587,0.00024750907,0.00017962985,0.00035318176,0.00025728103,0.00038350595,0.00044358408,0.00025117793,0.0024225186],"category_scores_gemma":[0.0009544029,0.0001245196,0.00032925472,0.00077958114,0.0003053131,0.00025377018,0.00016495925,0.00027401856,0.00014582406],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083548663,0.00016394298,0.071106195,0.00016077326,0.00013149441,0.000418969,0.00026190068,0.8502429,0.034264073,0.008305573,0.002580045,0.031528637],"study_design_scores_gemma":[0.00004095104,0.00041077164,0.2899801,0.000011600072,0.00013457416,0.00020214079,0.001339437,0.6850251,0.015462755,0.0020653675,0.0052807718,0.000046339304],"about_ca_topic_score_codex":0.16726835,"about_ca_topic_score_gemma":0.1509926,"teacher_disagreement_score":0.16726835,"about_ca_system_score_codex":0.0028171584,"about_ca_system_score_gemma":0.0007940499,"threshold_uncertainty_score":0.33258945},"labels":[],"label_agreement":null},{"id":"W2107609298","doi":"10.1109/tsg.2011.2114678","title":"Wireless Sensor Networks for Cost-Efficient Residential Energy Management in the Smart Grid","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":545,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Energy management; Wireless sensor network; Network packet; Computer science; Efficient energy use; Wireless; Computer network; Environmental economics; Energy (signal processing); Telecommunications; Engineering; Electrical engineering","score_opus":0.023070223862564326,"score_gpt":0.21655173535019884,"score_spread":0.1934815114876345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107609298","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26521978,0.014603113,0.684245,0.0033062277,0.00060007547,0.0002171645,0.00031178808,0.00094630115,0.03055063],"genre_scores_gemma":[0.9148441,0.0045799883,0.075247474,0.00016318673,0.0000769185,0.00007280886,0.00016839654,0.000034144785,0.004813031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997347,0.00011138006,0.000009826738,0.000019737634,0.000105329695,0.000019044419],"domain_scores_gemma":[0.9997899,0.00010210754,0.000027387916,0.000024484596,0.000048388414,0.000007719673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005350696,0.00031166355,0.00029242592,0.00018573881,0.00019955437,0.00049271487,0.00039529358,0.0003137262,0.001801653],"category_scores_gemma":[0.0007463973,0.00011092912,0.00016631576,0.00051077007,0.000162268,0.00085990626,0.0002529332,0.0003548906,0.0001896494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056863256,0.00025100625,0.0037809403,0.0004796696,0.00013264711,0.0002522138,0.000095235475,0.58830893,0.04248186,0.0503403,0.010355692,0.3029529],"study_design_scores_gemma":[0.000037609498,0.00039959364,0.0015416474,0.000036597034,0.000045047498,0.0001102071,0.00007413829,0.95500094,0.013024912,0.012577335,0.017133713,0.000018127006],"about_ca_topic_score_codex":0.0010271232,"about_ca_topic_score_gemma":0.0020251754,"teacher_disagreement_score":0.001801653,"about_ca_system_score_codex":0.00036701967,"about_ca_system_score_gemma":0.00035421207,"threshold_uncertainty_score":0.0060271025},"labels":[],"label_agreement":null},{"id":"W2109634777","doi":"10.1109/iccw.2011.5963580","title":"Distributed Scheduling in Smart Grid Communications with Dynamic Power Demands and Intermittent Renewable Energy Resources","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Renewable energy; Smart grid; Computer science; Markov decision process; Scheduling (production processes); Grid; Distributed computing; Dynamic priority scheduling; Mathematical optimization; Demand response; Markov process; Engineering; Electricity; Electrical engineering; Telecommunications; Quality of service","score_opus":0.01051216123275808,"score_gpt":0.18568886646150431,"score_spread":0.17517670522874623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109634777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.072027534,0.00034027858,0.92410964,0.00043562532,0.00006593136,0.000044162476,0.00002972513,0.00017129417,0.002775834],"genre_scores_gemma":[0.96059984,0.0002038294,0.037830118,0.000050788127,0.000047526835,0.000051893607,0.000028034921,0.000018992221,0.0011689644],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908066,0.0005119984,0.00003398487,0.000113232134,0.00016172566,0.000098437],"domain_scores_gemma":[0.9983285,0.001074406,0.0002399316,0.00012674279,0.00013764744,0.00009277203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015556728,0.0004242666,0.0007466282,0.0002808507,0.00057400163,0.00083597325,0.0005620088,0.0005340172,0.00082233653],"category_scores_gemma":[0.0027406695,0.00028005044,0.00030077173,0.00053294277,0.00082006917,0.0009221608,0.0005761566,0.00067164865,0.00014297165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008703685,0.000033566255,0.0002821231,0.000016980079,0.000011884579,0.00004873021,0.000036458627,0.9663364,0.0006430723,0.020045804,0.00033630437,0.012121555],"study_design_scores_gemma":[0.000010293565,0.00001100504,0.00003848488,0.0000012189782,0.0000017620528,0.000005558758,0.000005714765,0.9946443,0.0001442306,0.0049918643,0.00014369296,0.0000019211982],"about_ca_topic_score_codex":0.004253775,"about_ca_topic_score_gemma":0.004988763,"teacher_disagreement_score":0.004253775,"about_ca_system_score_codex":0.0012194139,"about_ca_system_score_gemma":0.0012201646,"threshold_uncertainty_score":0.008847475},"labels":[],"label_agreement":null},{"id":"W2110421102","doi":"10.1109/ccece.2014.6901159","title":"Agent-based simulation of home energy management system in residential demand response","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Load management; Peak demand; Home automation; Energy management system; Computer science; Energy management; Demand management; Energy consumption; Multi-agent system; Electricity; Environmental economics; Energy (signal processing); Engineering; Telecommunications","score_opus":0.005849673359613627,"score_gpt":0.1928815167796781,"score_spread":0.1870318434200645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110421102","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6647405,0.00031504224,0.281,0.0007380206,0.00015379865,0.00032179052,0.00093115924,0.0010952438,0.050704382],"genre_scores_gemma":[0.98215634,0.00010209185,0.012701685,0.00002962992,0.0000073671968,0.0001417605,0.00017102419,0.00002403214,0.004666092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997718,0.000108974804,0.000011185804,0.000027619099,0.00004236752,0.00003815687],"domain_scores_gemma":[0.99957675,0.00023575772,0.00004124095,0.000026345871,0.000082591585,0.000037297057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035816524,0.0004474214,0.00060371426,0.00027715098,0.00047219906,0.0008856154,0.0008557176,0.0009247256,0.0037196563],"category_scores_gemma":[0.00088105147,0.00027317027,0.0004600578,0.00029280112,0.0003920397,0.00068538944,0.00057717424,0.0006773143,0.00026896424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041486466,0.000037584596,0.00054039166,0.000013244314,0.000010580617,0.000038788086,0.00002611067,0.9955249,0.00027999215,0.002356208,0.00015688082,0.0009738941],"study_design_scores_gemma":[0.000009356013,0.000010960236,0.000073109826,0.0000013147976,0.0000029471155,0.0000023161488,0.000009727639,0.99926823,0.00010489141,0.00031088822,0.00020442127,0.0000018803545],"about_ca_topic_score_codex":0.020976428,"about_ca_topic_score_gemma":0.012080651,"teacher_disagreement_score":0.020976428,"about_ca_system_score_codex":0.00089104223,"about_ca_system_score_gemma":0.0010027498,"threshold_uncertainty_score":0.04170865},"labels":[],"label_agreement":null},{"id":"W2110769230","doi":"10.1002/sec.895","title":"CIT: A credit‐based incentive tariff scheme with fraud‐traceability for smart grid","year":2013,"lang":"en","type":"article","venue":"Security and Communication Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Tariff; Incentive; Computer science; Traceability; Smart grid; Database transaction; Economic shortage; Computer security; Demand response; Power (physics); Business; Environmental economics; Microeconomics; Electricity; Government (linguistics); Economics; Database; Electrical engineering","score_opus":0.004988190215180597,"score_gpt":0.17795197697595788,"score_spread":0.17296378676077728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110769230","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08203615,0.0005574514,0.9013704,0.0014034428,0.00045046813,0.0009664801,0.0002685334,0.0015038017,0.011443316],"genre_scores_gemma":[0.94838655,0.00015545549,0.04740283,0.00023624353,0.00011793971,0.00016960283,0.00011032153,0.000029280785,0.0033917543],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956065,0.0016814995,0.0002385094,0.00043955553,0.0013613874,0.00067248143],"domain_scores_gemma":[0.99181056,0.0025033767,0.001392393,0.0021110016,0.0015517084,0.00063090643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045143445,0.0008373855,0.0012482663,0.0016069907,0.0014885581,0.0019074496,0.0037509028,0.002500299,0.0042465343],"category_scores_gemma":[0.011309594,0.00028279607,0.0007728802,0.0023301644,0.002286526,0.003823245,0.0035174433,0.0024942115,0.00075802143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028583063,0.001074979,0.0046660374,0.0004261572,0.00019259551,0.0015067877,0.00038943815,0.31932956,0.022511099,0.35065022,0.020603072,0.27579176],"study_design_scores_gemma":[0.00022448825,0.00039859573,0.0005254363,0.000037631708,0.000042069376,0.00064765825,0.000047664395,0.92049015,0.0051357998,0.06505484,0.007305694,0.00009003784],"about_ca_topic_score_codex":0.0014587478,"about_ca_topic_score_gemma":0.0009215298,"teacher_disagreement_score":0.0045143445,"about_ca_system_score_codex":0.0020018762,"about_ca_system_score_gemma":0.0023038348,"threshold_uncertainty_score":0.023874462},"labels":[],"label_agreement":null},{"id":"W2113286802","doi":"10.18086/eurosun.2010.06.24","title":"Load Matching and Grid Interaction of Net Zero Energy Buildings","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":149,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Zero-energy building; Zero (linguistics); Grid; Net (polyhedron); Computer science; Matching (statistics); Energy (signal processing); Mathematics; Statistics; Geometry","score_opus":0.004054249245348528,"score_gpt":0.18894129931515705,"score_spread":0.18488705006980852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113286802","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20174171,0.000213005,0.6728965,0.00041823066,0.00007921839,0.00015489012,0.0004149906,0.00041838642,0.12366305],"genre_scores_gemma":[0.9378922,0.000097604985,0.05084636,0.0000494438,0.00002245092,0.00009165319,0.00051730475,0.00013553422,0.010347472],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980989,0.00072271074,0.000089844514,0.00021191926,0.00064393226,0.00023273466],"domain_scores_gemma":[0.99944025,0.00019352879,0.00008384901,0.00011193603,0.00012980064,0.000040696497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010820806,0.00037286154,0.0004892987,0.00067634473,0.0007681696,0.0026648385,0.0012081894,0.00080366,0.005389813],"category_scores_gemma":[0.002183238,0.00021069232,0.00058635446,0.0010708031,0.0010642944,0.0024520468,0.0020131366,0.0007711793,0.00061856426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032227286,0.000093262206,0.0047487356,0.0001102256,0.000023231942,0.00026673466,0.0007237215,0.22823803,0.0044555054,0.70417094,0.0031841835,0.053663068],"study_design_scores_gemma":[0.00003399144,0.00012606513,0.00451236,0.000034702643,0.00002795345,0.00022974647,0.0007433053,0.6392608,0.008209542,0.31412634,0.032659214,0.000035939112],"about_ca_topic_score_codex":0.0021539778,"about_ca_topic_score_gemma":0.0026258929,"teacher_disagreement_score":0.005389813,"about_ca_system_score_codex":0.0012757715,"about_ca_system_score_gemma":0.00060001743,"threshold_uncertainty_score":0.018030703},"labels":[],"label_agreement":null},{"id":"W2114147640","doi":"10.1109/pesgm.2012.6344624","title":"Tracking energy consumptions of home appliances using electrical signature data","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Smart meter; Metering mode; Home automation; Electricity meter; Harmonics; Computer science; Energy conservation; Tracking (education); Electric potential energy; Energy (signal processing); Metre; Real-time computing; Power (physics); Embedded system; Electrical engineering; Telecommunications; Engineering; Voltage","score_opus":0.05907985420678087,"score_gpt":0.2635793518834201,"score_spread":0.20449949767663922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114147640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85617185,0.0003320406,0.12842757,0.00018663413,0.000063474734,0.00005864253,0.0010052585,0.0016233956,0.012131141],"genre_scores_gemma":[0.98244023,0.0001751955,0.015580664,0.000018354878,0.000011369739,0.0000092256805,0.0003112695,0.000030603293,0.001423051],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998468,0.000023376551,0.000011691437,0.000032620894,0.00007246226,0.0000130007165],"domain_scores_gemma":[0.9996848,0.00009881887,0.00007641966,0.00004914432,0.000076269745,0.000014540088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012117262,0.00020018994,0.00021646934,0.0010225684,0.00010536636,0.00038731177,0.00015788455,0.00023807658,0.0009812929],"category_scores_gemma":[0.00071534625,0.00008249465,0.00009167539,0.0009162439,0.0001012997,0.0004544595,0.00016709702,0.00019463063,0.0004087517],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00091758947,0.0002772749,0.12408926,0.00024539768,0.00009110775,0.0005175131,0.00045444097,0.026351636,0.18802197,0.0031433254,0.002660409,0.6532301],"study_design_scores_gemma":[0.00005251623,0.00057700765,0.2537736,0.000081350365,0.00012292246,0.0015755456,0.0006904054,0.4602407,0.262749,0.0060204878,0.014002095,0.00011435168],"about_ca_topic_score_codex":0.0006263673,"about_ca_topic_score_gemma":0.0014612965,"teacher_disagreement_score":0.0010225684,"about_ca_system_score_codex":0.0001497547,"about_ca_system_score_gemma":0.00010051559,"threshold_uncertainty_score":0.0032827854},"labels":[],"label_agreement":null},{"id":"W2114854054","doi":"10.1016/j.apenergy.2015.10.074","title":"Renewable resources portfolio optimization in the presence of demand response","year":2015,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Pacific Institute for Climate Solutions; Battelle; Natural Resources Canada; U.S. Department of Energy","keywords":"Demand response; Renewable energy; Renewable resource; Portfolio; Environmental economics; Electricity; Electricity demand; Electricity generation; Peak demand; Economics; Natural resource economics; Engineering; Power (physics)","score_opus":0.010619132160983901,"score_gpt":0.1928307216815364,"score_spread":0.1822115895205525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114854054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46287808,0.0012474273,0.50266105,0.003309471,0.00035126932,0.00009232538,0.0005586326,0.00033423357,0.028567482],"genre_scores_gemma":[0.9904295,0.000118045544,0.006296966,0.000060174294,0.000054199878,0.000014899098,0.00008227008,0.000028504184,0.0029154106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994041,0.0003246095,0.00002044511,0.00007819851,0.00008627009,0.0000863903],"domain_scores_gemma":[0.9971564,0.0022038615,0.00024670883,0.00009004089,0.00018628068,0.00011681464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018772769,0.00069362955,0.0014438735,0.0004260281,0.0002602445,0.0016720258,0.0008124936,0.0015689005,0.0019522188],"category_scores_gemma":[0.007326547,0.0005856041,0.0003722363,0.0006317186,0.00045821635,0.001772643,0.0008414656,0.0013147766,0.00018350825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089178284,0.000031573254,0.00053738145,0.00001926816,0.000037719794,0.00011072505,0.0000083756595,0.989792,0.00024383092,0.0048988764,0.00051751576,0.003713481],"study_design_scores_gemma":[0.000004454647,0.0000074783084,0.000084869454,0.0000010201335,0.0000033366946,0.000007830798,0.0000034324796,0.998804,0.000051782332,0.0009735784,0.000056733574,0.000001650993],"about_ca_topic_score_codex":0.0037181035,"about_ca_topic_score_gemma":0.0032340274,"teacher_disagreement_score":0.0037181035,"about_ca_system_score_codex":0.00048813346,"about_ca_system_score_gemma":0.00062665803,"threshold_uncertainty_score":0.009928107},"labels":[],"label_agreement":null},{"id":"W2115383271","doi":"10.1109/repcon.2006.1649054","title":"The Energy Policy Act of 2005 and its Impact on Distributed Generation","year":2006,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Electricity; Distributed generation; Incentive; Electricity generation; Electricity market; Environmental economics; Electricity retailing; Business; Grid; Energy policy; Smart grid; Electric power transmission; Industrial organization; Power (physics); Renewable energy; Economics; Engineering; Electrical engineering; Microeconomics; Political science; Law","score_opus":0.006091619740424931,"score_gpt":0.216841067364056,"score_spread":0.21074944762363107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115383271","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059548263,0.022706952,0.005606088,0.038300555,0.004890696,0.00017912553,0.0026412706,0.00027785846,0.9194427],"genre_scores_gemma":[0.167393,0.05654221,0.017164716,0.09247543,0.0020684083,0.00060699356,0.0046799243,0.00022281586,0.65884644],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99426985,0.0005746459,0.0002637628,0.00028456014,0.0040174546,0.0005897961],"domain_scores_gemma":[0.9981027,0.00045439936,0.0002567189,0.00015178153,0.00089275814,0.00014163835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002405822,0.0006153812,0.00038075141,0.0014696319,0.002173067,0.0042244163,0.0009048259,0.0042821267,0.008138415],"category_scores_gemma":[0.0077517657,0.00032884063,0.0005985989,0.0027897975,0.0014614905,0.0022987712,0.0019580072,0.0027829225,0.0034279176],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004452892,0.00007370453,0.0013180337,0.00023240769,0.000016424716,0.00025141632,0.00040729292,0.0017344963,0.0003828373,0.5576302,0.3475509,0.090357766],"study_design_scores_gemma":[0.000003982017,0.00001436687,0.0013379651,0.00024570053,0.0000066523244,0.000045650286,0.00007070529,0.00014310551,0.00013708448,0.007584283,0.9904005,0.000010033892],"about_ca_topic_score_codex":0.11327917,"about_ca_topic_score_gemma":0.087119065,"teacher_disagreement_score":0.11327917,"about_ca_system_score_codex":0.008459127,"about_ca_system_score_gemma":0.01914839,"threshold_uncertainty_score":0.22523963},"labels":[],"label_agreement":null},{"id":"W2116347721","doi":"10.1109/pes.2007.386127","title":"Optimal Operation of a Disco in Competitive Electricity Markets with Elasticity Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Electricity market; Price elasticity of demand; Elasticity (physics); Computer science; Supply and demand; Context (archaeology); Operations research; Industrial organization; Microeconomics; Economics; Engineering","score_opus":0.0024075307191921943,"score_gpt":0.18133982192014006,"score_spread":0.17893229120094786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116347721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6604427,0.0003763821,0.30800927,0.0008267504,0.0000788661,0.00024829147,0.00036403237,0.0002489249,0.029404733],"genre_scores_gemma":[0.98717076,0.00009294522,0.011154586,0.000026162505,0.0000070976366,0.00003477255,0.000042073865,0.00001939362,0.0014523045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996183,0.00013099032,0.000017252614,0.000058328344,0.000061793595,0.00011324619],"domain_scores_gemma":[0.9993955,0.0003104786,0.000107204534,0.000031547395,0.00005431939,0.00010092346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071825256,0.0007213036,0.00073890755,0.00050831126,0.00066125335,0.0022936785,0.00064958836,0.0009730996,0.0024202864],"category_scores_gemma":[0.0016579365,0.0005120953,0.0003690374,0.0004995722,0.00096656545,0.0017356862,0.0012124844,0.00067687384,0.00023701481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039189373,0.00006374156,0.0013200172,0.00005557538,0.000017519937,0.00025699486,0.00007357144,0.97541386,0.0018286068,0.009896609,0.0004995097,0.01018205],"study_design_scores_gemma":[0.000025569112,0.00008152743,0.00033901347,0.0000046151317,0.0000062357567,0.00003466552,0.00010439598,0.9934336,0.0007480643,0.00462713,0.00058315234,0.000011994544],"about_ca_topic_score_codex":0.0048371116,"about_ca_topic_score_gemma":0.0031468302,"teacher_disagreement_score":0.0048371116,"about_ca_system_score_codex":0.0012279138,"about_ca_system_score_gemma":0.0011402648,"threshold_uncertainty_score":0.009617925},"labels":[],"label_agreement":null},{"id":"W2118052644","doi":"10.1109/iswpc.2011.5751338","title":"On the design and implementation of a home energy management system","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy management; Enabling; Smart grid; Energy management system; Home automation; Computer science; Energy consumption; Key (lock); Building management system; Holistic management; Scheduling (production processes); Energy (signal processing); Computer security; Telecommunications; Engineering; Operations management","score_opus":0.016197670401229252,"score_gpt":0.18401623242995493,"score_spread":0.1678185620287257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118052644","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057940394,0.0003155036,0.87201,0.0008587636,0.00022070615,0.00077204785,0.000077638084,0.0040924395,0.06371248],"genre_scores_gemma":[0.5987147,0.00036563768,0.37891826,0.00040026355,0.000056795,0.00045232326,0.00016126552,0.00017785963,0.020752782],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994361,0.00013168433,0.000029345778,0.000081160935,0.00024719886,0.00007457291],"domain_scores_gemma":[0.9996226,0.000049178998,0.000030705334,0.000056590216,0.00020806598,0.000032872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052052346,0.00030155416,0.00035720193,0.00022301242,0.0005146168,0.0012931955,0.00088880834,0.00064495584,0.0035894269],"category_scores_gemma":[0.0008584277,0.00026175124,0.00021544966,0.00017862437,0.00031362273,0.00078311854,0.0004321659,0.00067161216,0.0011515382],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006840115,0.000694793,0.0067171357,0.000744678,0.00015372787,0.0010362862,0.0010803123,0.12821577,0.22162737,0.13004184,0.014076533,0.49492753],"study_design_scores_gemma":[0.00018267534,0.0010355087,0.00399855,0.00018639343,0.00018708978,0.0006377979,0.00037611992,0.58628774,0.17481768,0.009789804,0.2224391,0.00006161216],"about_ca_topic_score_codex":0.0017819946,"about_ca_topic_score_gemma":0.0018832325,"teacher_disagreement_score":0.0035894269,"about_ca_system_score_codex":0.00055605866,"about_ca_system_score_gemma":0.0011183801,"threshold_uncertainty_score":0.0120078325},"labels":[],"label_agreement":null},{"id":"W2118581055","doi":"10.1109/pes.2011.6039062","title":"Achieving greater VVO benefits through AMI implementation","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"BC Hydro","keywords":"Metering mode; Risk analysis (engineering); Computer science; Reliability engineering; Engineering; Business","score_opus":0.04400203996157525,"score_gpt":0.22254989435232875,"score_spread":0.1785478543907535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118581055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89129657,0.00045070364,0.056256223,0.0006542856,0.00011515601,0.00020073782,0.0003346184,0.0009768935,0.049714915],"genre_scores_gemma":[0.99087733,0.00013801409,0.006672055,0.000052643758,0.000028806153,0.000022887556,0.00014822645,0.000023195273,0.0020369506],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994722,0.0001374573,0.000031050673,0.00006507311,0.0001702205,0.00012390869],"domain_scores_gemma":[0.9992781,0.00026230727,0.00009074664,0.00010539029,0.00021247518,0.000050878236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006517131,0.00033876768,0.0003229201,0.00032513842,0.00017598353,0.0006880022,0.00035055404,0.00036441407,0.00420633],"category_scores_gemma":[0.0011594893,0.00006944246,0.0003218324,0.00042367933,0.0002052561,0.00081428787,0.0007501835,0.0005441378,0.0003951738],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002933582,0.002447395,0.032978848,0.00069222704,0.00020654041,0.0006566145,0.00035195114,0.11881175,0.20266184,0.020831792,0.0046393396,0.61278814],"study_design_scores_gemma":[0.0011765372,0.0232852,0.30350932,0.00021568914,0.00094332633,0.0014914357,0.002329896,0.1544635,0.38387552,0.02065662,0.10784655,0.00020647512],"about_ca_topic_score_codex":0.0007824408,"about_ca_topic_score_gemma":0.0009873192,"teacher_disagreement_score":0.00420633,"about_ca_system_score_codex":0.00023825439,"about_ca_system_score_gemma":0.00032040392,"threshold_uncertainty_score":0.014071584},"labels":[],"label_agreement":null},{"id":"W2120645645","doi":"10.1109/isgt.2012.6175809","title":"A test bed for self-regulating distribution systems: Modeling integrated renewable energy and demand response in the GridLAB-D/MATLAB environment","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Natural Environment Research Council","keywords":"Renewable energy; Demand response; MATLAB; Computer science; Distributed generation; Wind power; Automotive engineering; Engineering; Electrical engineering; Electricity","score_opus":0.00936627085406008,"score_gpt":0.18357982500050474,"score_spread":0.17421355414644465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120645645","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51357865,0.00015203413,0.46398327,0.00022260039,0.00014277532,0.0005772469,0.0018014477,0.008921079,0.010620913],"genre_scores_gemma":[0.9187807,0.00011541301,0.07690292,0.00003289004,0.000008314128,0.00040190565,0.00071414263,0.00025029358,0.0027934108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997615,0.00009492272,0.000019370318,0.000027853755,0.00006909312,0.000027178261],"domain_scores_gemma":[0.9991473,0.00049987476,0.00005008489,0.00012042375,0.00013606722,0.000046276135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046025083,0.000735868,0.00046993617,0.00028780245,0.00026863007,0.0005045314,0.0011704708,0.00048710968,0.0047883564],"category_scores_gemma":[0.0011597417,0.00030485037,0.0003608459,0.00022321068,0.0002960398,0.00042039723,0.00033436847,0.00065632566,0.0007454324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035142672,0.00044676295,0.0027819597,0.00023982071,0.00006880945,0.0002597657,0.00012277167,0.94834256,0.0214241,0.0028615661,0.0016199634,0.021480514],"study_design_scores_gemma":[0.00004804497,0.0001709513,0.000469571,0.0000054318466,0.000008344435,0.00002321697,0.00001884057,0.9790254,0.018827133,0.0003257435,0.0010671351,0.000010089567],"about_ca_topic_score_codex":0.0045301584,"about_ca_topic_score_gemma":0.0026349889,"teacher_disagreement_score":0.0047883564,"about_ca_system_score_codex":0.00034205074,"about_ca_system_score_gemma":0.0004840929,"threshold_uncertainty_score":0.016018689},"labels":[],"label_agreement":null},{"id":"W2121039373","doi":"10.1109/sege.2013.6707902","title":"Flexible residential smart grid simulation framework","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Smart grid; Demand response; Energy consumption; Scheduling (production processes); Grid; Electricity; Distributed computing; Consumption (sociology); Industrial engineering; Engineering; Operations management","score_opus":0.009668302214354042,"score_gpt":0.2186472836183008,"score_spread":0.20897898140394675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121039373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06126134,0.00011753062,0.8959842,0.00032728273,0.000065552085,0.00035868783,0.0019707053,0.00854881,0.031365857],"genre_scores_gemma":[0.75782424,0.0003946278,0.22485614,0.00011458428,0.000035052744,0.00093520567,0.0024639694,0.0005383994,0.012837857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996426,0.00014922366,0.000026198026,0.00005428901,0.00008298494,0.00004471684],"domain_scores_gemma":[0.99966705,0.000121614954,0.000023919376,0.00007303473,0.00008725904,0.000027109298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058530254,0.00051315123,0.00069761614,0.0004923428,0.0005164283,0.000835446,0.0018021272,0.00075891695,0.00740864],"category_scores_gemma":[0.0009870826,0.00028007076,0.0006875923,0.00071908196,0.00040228214,0.000953782,0.00075632945,0.00068121887,0.0008817767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056043977,0.000045639015,0.0005505329,0.000034855493,0.000015988351,0.00006882018,0.00006528366,0.9694436,0.0009375335,0.02000204,0.0013942688,0.007385469],"study_design_scores_gemma":[0.000013144856,0.000009513964,0.00006882672,0.0000030785304,0.000004167687,0.0000119499255,0.000011912888,0.9936469,0.00051183853,0.0024931382,0.0032200848,0.0000053505128],"about_ca_topic_score_codex":0.0102271,"about_ca_topic_score_gemma":0.006022837,"teacher_disagreement_score":0.0102271,"about_ca_system_score_codex":0.00086111407,"about_ca_system_score_gemma":0.0010848964,"threshold_uncertainty_score":0.024784386},"labels":[],"label_agreement":null},{"id":"W2121288295","doi":"10.22215/etd/2010-08785","title":"Towards the assessment of a residential electric storage system : analysis of Canadian residential electricity use and the development of a lithium-ion battery model","year":2010,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canadian Heritage; Queen's University; Library and Archives Canada","funders":"","keywords":"Electricity; Engineering; Electrical engineering","score_opus":0.012654528539019917,"score_gpt":0.22473391705540147,"score_spread":0.21207938851638156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121288295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81581205,0.0012114161,0.09022915,0.0017652889,0.000072016155,0.0005960328,0.004030551,0.0006224956,0.08566091],"genre_scores_gemma":[0.973125,0.00051223446,0.010123227,0.00003619549,0.0000054549337,0.000059444414,0.0007892281,0.00005060908,0.01529874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978834,0.000031086573,0.0000070171914,0.000023814815,0.0001142089,0.000035535242],"domain_scores_gemma":[0.9997416,0.000027268872,0.00000993613,0.0000080515365,0.00019825959,0.000014794333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044235025,0.0007371279,0.00037015858,0.00052203244,0.00094329653,0.0015305519,0.0011479717,0.0006271573,0.0026405097],"category_scores_gemma":[0.0009365697,0.00025068174,0.00054419145,0.0008430202,0.0003951975,0.0007995687,0.0003853765,0.00058801804,0.0002898686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010479053,0.000056631914,0.004910373,0.00012271004,0.00003816189,0.00010963704,0.00020646577,0.95798934,0.0047926097,0.007918243,0.002782246,0.020968763],"study_design_scores_gemma":[0.000026944266,0.000062345054,0.009973188,0.00002712999,0.000042613992,0.000021659185,0.0003450524,0.97867566,0.002947675,0.0018793078,0.005969256,0.000029261531],"about_ca_topic_score_codex":0.93067694,"about_ca_topic_score_gemma":0.9363132,"teacher_disagreement_score":0.06932306,"about_ca_system_score_codex":0.012493888,"about_ca_system_score_gemma":0.01468756,"threshold_uncertainty_score":0.13946259},"labels":[],"label_agreement":null},{"id":"W2121719138","doi":"10.5195/pjephl.2010.19","title":"Focusing on Demand Side Management in the Future of the Electric Grid","year":2010,"lang":"en","type":"article","venue":"Pittsburgh Journal of Environmental and Public Health Law","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Grid; Power grid; Electric power transmission; Telecommunications; Engineering; Electric power system; Power (physics); Geography; Electrical engineering; Physics","score_opus":0.006727325665731769,"score_gpt":0.19692306834394796,"score_spread":0.19019574267821618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121719138","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02819394,0.040669557,0.03496692,0.35603365,0.003243925,0.000039957737,0.0001606957,0.0001986874,0.53649265],"genre_scores_gemma":[0.80942696,0.052842442,0.009726303,0.036702096,0.0048073307,0.0000571042,0.0001317943,0.00010038016,0.086205676],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99954516,0.0001536201,0.000008281489,0.000046844823,0.00016633167,0.00007964334],"domain_scores_gemma":[0.9994547,0.00017900145,0.000042519816,0.000037957157,0.00018542602,0.000100477955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009893997,0.00030194165,0.00015188626,0.0001684403,0.0010343578,0.0033160027,0.00053316256,0.00271008,0.0068842405],"category_scores_gemma":[0.0012063943,0.00014669486,0.00012366503,0.00051000144,0.0015343459,0.0055481964,0.00095626153,0.0026516833,0.000815879],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004622199,0.00007918522,0.0013051982,0.0001401257,0.000008483768,0.00030805805,0.00040986578,0.013622155,0.0013389506,0.7147966,0.1494184,0.11852678],"study_design_scores_gemma":[0.000012676521,0.000056424702,0.0013596783,0.00024298958,0.0000073373703,0.00019361664,0.0016136566,0.018702036,0.0007800787,0.43657035,0.54043007,0.000031161984],"about_ca_topic_score_codex":0.0039123585,"about_ca_topic_score_gemma":0.00863212,"teacher_disagreement_score":0.0068842405,"about_ca_system_score_codex":0.0022671053,"about_ca_system_score_gemma":0.0020869898,"threshold_uncertainty_score":0.023030102},"labels":[],"label_agreement":null},{"id":"W2122997343","doi":"10.1109/psce.2009.4840195","title":"A generic operations framework for discos in retail electricity markets","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Scheduling (production processes); Computer science; Operations research; Electricity market; Context (archaeology); Electricity retailing; Operations management; Engineering","score_opus":0.014024991046295213,"score_gpt":0.22600493485350226,"score_spread":0.21197994380720706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122997343","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035464438,0.00057277386,0.9724841,0.0007217461,0.00011103742,0.00038583868,0.0006078048,0.00076376763,0.020806523],"genre_scores_gemma":[0.2554259,0.0020815819,0.7216989,0.00040705403,0.00032249428,0.0011922421,0.0021422724,0.00030273915,0.016426766],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99801147,0.00073195976,0.00024964838,0.0002558149,0.0005532134,0.00019792441],"domain_scores_gemma":[0.99929655,0.0002716931,0.000089143934,0.000101028534,0.00016932817,0.000072292234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003130818,0.0014134429,0.0007830111,0.0015353119,0.0011504928,0.004420187,0.0022328089,0.0016398005,0.010872227],"category_scores_gemma":[0.002149927,0.000470257,0.0012965933,0.0021993846,0.0014906377,0.004435003,0.0018680984,0.0018539415,0.002482507],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044961733,0.00004670784,0.00044198,0.00011682155,0.000015908781,0.00031724485,0.00017326037,0.15097088,0.00072953897,0.8075982,0.007929628,0.03161491],"study_design_scores_gemma":[0.000033048847,0.00005844051,0.00021869373,0.000114364666,0.00001827109,0.0002387615,0.00017615725,0.6673582,0.0005852191,0.23546547,0.09569823,0.00003509105],"about_ca_topic_score_codex":0.008480991,"about_ca_topic_score_gemma":0.0054581924,"teacher_disagreement_score":0.010872227,"about_ca_system_score_codex":0.0025066384,"about_ca_system_score_gemma":0.0026808965,"threshold_uncertainty_score":0.03637117},"labels":[],"label_agreement":null},{"id":"W2125214211","doi":"10.1109/tpwrs.2005.852147","title":"A Survey of Load Control Programs for Price and System Stability","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":115,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electric power system; Load management; Control (management); Computer science; Load regulation; Stability (learning theory); Control system; Demand side; Reliability engineering; Operations research; Power (physics); Economics; Environmental economics; Engineering; Electrical engineering; Voltage","score_opus":0.017335303402588154,"score_gpt":0.20852324337537573,"score_spread":0.19118793997278757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125214211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04083284,0.17568539,0.4405508,0.004947608,0.0009894866,0.0010085312,0.000981587,0.0050180648,0.32998565],"genre_scores_gemma":[0.4531585,0.20528811,0.2378067,0.0027503015,0.0018560676,0.001100521,0.0028470333,0.0016928061,0.09350002],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986743,0.00020969703,0.00005448973,0.00017392485,0.0007647864,0.0001228122],"domain_scores_gemma":[0.9979395,0.0010478941,0.00018658013,0.00022660883,0.00051441806,0.00008499437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013537239,0.00084786135,0.00051083945,0.0021353818,0.000623497,0.0012175442,0.0013671833,0.0007172402,0.011403826],"category_scores_gemma":[0.0030351358,0.00038886155,0.0006023016,0.0025429463,0.00052372576,0.0015880353,0.0006717348,0.0010816791,0.0031950288],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009365518,0.0004216134,0.0009142405,0.00083021977,0.000020403322,0.000042348052,0.000058052254,0.0055765226,0.0027490114,0.026626484,0.0127665475,0.94990087],"study_design_scores_gemma":[0.0001493001,0.00092504686,0.007650044,0.0014111536,0.00009075732,0.00085773825,0.000194756,0.037333913,0.020449528,0.026250916,0.90457493,0.00011188964],"about_ca_topic_score_codex":0.0013501677,"about_ca_topic_score_gemma":0.0014292416,"teacher_disagreement_score":0.011403826,"about_ca_system_score_codex":0.0010709193,"about_ca_system_score_gemma":0.0010379747,"threshold_uncertainty_score":0.038149595},"labels":[],"label_agreement":null},{"id":"W2126740271","doi":"10.1109/siecpc.2011.5876687","title":"Wireless Sensor Networks for smart grid applications","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Computer science; Telecommunications; Grid; Computer network; Computer security; Electrical engineering; Engineering","score_opus":0.017782046006270976,"score_gpt":0.1912954479795086,"score_spread":0.1735134019732376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126740271","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076332865,0.13682571,0.6900785,0.0116887055,0.00855383,0.0007754776,0.0023245933,0.0043390347,0.13778077],"genre_scores_gemma":[0.27957803,0.22976261,0.33610138,0.0057454444,0.007057328,0.0018276536,0.0072041065,0.0009901543,0.13173325],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937505,0.00015667021,0.000047467518,0.000088341156,0.00029895038,0.000033664386],"domain_scores_gemma":[0.9992955,0.00031216172,0.00006325321,0.000078418896,0.00021503498,0.000035669727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005610975,0.000946758,0.00058114534,0.0005804656,0.00033010016,0.0012251899,0.0010500312,0.0015419238,0.013920236],"category_scores_gemma":[0.0018731109,0.00023746745,0.0002804221,0.0019367749,0.00040786114,0.0020430447,0.0007756131,0.0018760399,0.0052443813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017001964,0.00012764304,0.000667385,0.0024633529,0.00006457626,0.0004282176,0.00019538934,0.043457735,0.012394859,0.12689272,0.1677397,0.64539826],"study_design_scores_gemma":[0.00004407274,0.00015963073,0.0007309741,0.00067689014,0.00002836138,0.0005573732,0.00015086545,0.12649626,0.002388602,0.11401722,0.7547056,0.00004404241],"about_ca_topic_score_codex":0.0004764155,"about_ca_topic_score_gemma":0.0006078905,"teacher_disagreement_score":0.013920236,"about_ca_system_score_codex":0.00034960918,"about_ca_system_score_gemma":0.00050561,"threshold_uncertainty_score":0.046567857},"labels":[],"label_agreement":null},{"id":"W2126993083","doi":"10.1007/s12053-014-9265-7","title":"The benefits of combining utility-controlled demand response with residential zoned cooling","year":2014,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Cooling load; Air conditioning; Environmental science; Demand response; Cycling; Demographics; Peak demand; Passive cooling; Control (management); Meteorology; Engineering; Computer science; Mechanical engineering; Electricity; Geography","score_opus":0.004953163503203689,"score_gpt":0.18364890141367365,"score_spread":0.17869573791046997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126993083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41530064,0.0005777173,0.53185016,0.0011824341,0.00033732745,0.00015723384,0.00040240693,0.003512593,0.0466795],"genre_scores_gemma":[0.99028414,0.000040459257,0.008095661,0.00004944368,0.000024585319,0.000012735054,0.000045195524,0.000037321406,0.0014105114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996265,0.00014577762,0.0000122348765,0.00008556473,0.00007562548,0.000054204425],"domain_scores_gemma":[0.9994636,0.00019908557,0.000046632453,0.000111701906,0.00014727283,0.000031766864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036561876,0.00055111514,0.00043834842,0.00020068091,0.0002860798,0.00078223547,0.0010135405,0.00036712378,0.0039103986],"category_scores_gemma":[0.0009991779,0.00019649228,0.00025495025,0.00053163123,0.00033381107,0.00094998156,0.00057829067,0.0005454604,0.00066790683],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002656496,0.0011221772,0.005447655,0.00025641892,0.00016549093,0.00014583088,0.00015655937,0.66849214,0.076552115,0.012983233,0.006673974,0.22534798],"study_design_scores_gemma":[0.00018064927,0.00042913263,0.0033137074,0.000016834374,0.000073450945,0.00008474317,0.00011644588,0.9567012,0.025392646,0.0063870335,0.007263498,0.000040638894],"about_ca_topic_score_codex":0.0029812255,"about_ca_topic_score_gemma":0.006047683,"teacher_disagreement_score":0.0039103986,"about_ca_system_score_codex":0.00043440104,"about_ca_system_score_gemma":0.00048794923,"threshold_uncertainty_score":0.013081551},"labels":[],"label_agreement":null},{"id":"W2127297430","doi":"10.1109/jsac.2015.2481212","title":"Real-Time Energy Storage Management With Renewable Integration: Finite-Time Horizon Approach","year":2015,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Mathematical optimization; Lyapunov optimization; Time horizon; Renewable energy; Optimization problem; Dynamic programming; Energy management; System dynamics; Lyapunov function; Energy (signal processing); Lyapunov equation; Nonlinear system; Algorithm; Mathematics","score_opus":0.021570470876801105,"score_gpt":0.22653082313763445,"score_spread":0.20496035226083334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127297430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017295897,0.0005093786,0.9765024,0.00031097524,0.000048570582,0.00003260026,0.000037594986,0.000116814284,0.005145648],"genre_scores_gemma":[0.96313477,0.00051847554,0.034014776,0.000066580076,0.0000357097,0.00006238874,0.000028233188,0.000020168807,0.0021189002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975365,0.000077944824,0.0000110952105,0.000042146115,0.000077174096,0.000037981838],"domain_scores_gemma":[0.9996012,0.00023946776,0.00006955809,0.000018665487,0.00005135558,0.000019749761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055535947,0.0005574009,0.00065698836,0.00025639482,0.0003067726,0.00082387665,0.0008172585,0.00065452536,0.0019703843],"category_scores_gemma":[0.0010952005,0.00026543648,0.0004776824,0.0003697535,0.0005674698,0.00089717866,0.00050638005,0.0006856612,0.00011694253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003319016,0.000021966163,0.00014509205,0.00006756705,0.000016016747,0.00006312903,0.00003012937,0.9710617,0.0013589025,0.015768845,0.00028762026,0.011145853],"study_design_scores_gemma":[0.0000035234934,0.000013977854,0.00003635953,0.0000039571223,0.0000042462957,0.0000067805154,0.000004408977,0.9967451,0.00034509762,0.002660293,0.00017300797,0.000003118283],"about_ca_topic_score_codex":0.003966782,"about_ca_topic_score_gemma":0.0032616742,"teacher_disagreement_score":0.003966782,"about_ca_system_score_codex":0.000924663,"about_ca_system_score_gemma":0.00097447686,"threshold_uncertainty_score":0.007887363},"labels":[],"label_agreement":null},{"id":"W2127769373","doi":"10.1155/2014/492320","title":"GridLAB-D: An Agent-Based Simulation Framework for Smart Grids","year":2014,"lang":"en","type":"article","venue":"Journal of Applied Mathematics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":201,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Office of Electricity; U.S. Department of Energy","keywords":"Smart grid; Computer science; Electric power system; Electricity; Wind power; Grid; Systems engineering; Distributed generation; Demand response; Production (economics); Renewable energy; Industrial engineering; Distributed computing; Power (physics); Electrical engineering; Engineering","score_opus":0.018863718541056805,"score_gpt":0.25216638569580274,"score_spread":0.23330266715474593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127769373","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044171335,0.00024739836,0.9635766,0.00040146703,0.00018550444,0.00025717827,0.0016035641,0.020555336,0.008755814],"genre_scores_gemma":[0.21391515,0.0011971319,0.76299596,0.0005173282,0.00012351428,0.0018764882,0.0056224223,0.0047365096,0.009015435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931157,0.0002847243,0.00006700983,0.000069319496,0.00020173365,0.00006558897],"domain_scores_gemma":[0.9989127,0.00051544927,0.00008173392,0.00015848689,0.00019836838,0.00013329323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014024168,0.0012630625,0.0011506391,0.0006714458,0.00078137766,0.001848923,0.0029716175,0.001649195,0.011644842],"category_scores_gemma":[0.0028620565,0.0009258395,0.0015196421,0.00067499606,0.00085961825,0.0018391676,0.0020368136,0.0029298628,0.0022911516],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017707734,0.000119852295,0.0009545293,0.00026180068,0.00012399159,0.00014243333,0.00015893544,0.8933004,0.0022573054,0.05480484,0.020086592,0.027612295],"study_design_scores_gemma":[0.00010283681,0.00002066967,0.000059480215,0.000019078221,0.000013756697,0.000025990013,0.0000090010135,0.96221745,0.00092336966,0.011104688,0.025486782,0.000016985634],"about_ca_topic_score_codex":0.010292094,"about_ca_topic_score_gemma":0.008244967,"teacher_disagreement_score":0.011644842,"about_ca_system_score_codex":0.00096765,"about_ca_system_score_gemma":0.0021257165,"threshold_uncertainty_score":0.038955867},"labels":[],"label_agreement":null},{"id":"W2128793456","doi":"10.1109/tste.2014.2309661","title":"Impact of Energy Storage Systems on Electricity Market Equilibrium","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":112,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; University of Waterloo","funders":"Government of Canada","keywords":"Energy storage; Electricity market; Arbitrage; Market clearing; Mixed complementarity problem; Market price; Demand response; Economic dispatch; Electric power system; Computer science; Smart grid; Electricity; Distributed generation; Mathematical optimization; Microeconomics; Economics; Renewable energy; Power (physics); Engineering; Electrical engineering; Finance","score_opus":0.004894339326047541,"score_gpt":0.19703263883692027,"score_spread":0.19213829951087272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128793456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6737611,0.0035957366,0.10082377,0.007901977,0.00048107785,0.00014657354,0.0013404558,0.00058591017,0.2113634],"genre_scores_gemma":[0.99449193,0.00035118492,0.00079797214,0.00007976339,0.000029324961,0.00001705558,0.000054549913,0.000027885771,0.004150423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952567,0.00019252344,0.000019923857,0.00004644007,0.00007269491,0.00014278937],"domain_scores_gemma":[0.9955707,0.0033067248,0.00042863548,0.00010672319,0.000385475,0.0002016639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011353451,0.00058849604,0.0010569431,0.00054240465,0.0006345768,0.0029235457,0.00065892475,0.0012430216,0.021046609],"category_scores_gemma":[0.008545914,0.0005011953,0.00058014836,0.000495237,0.0010464893,0.0032663392,0.0013659728,0.0012553153,0.0008100279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061095605,0.00016531168,0.0022410087,0.0002526924,0.00006376604,0.0008820803,0.00008418362,0.695119,0.004768877,0.2774078,0.004341135,0.014063143],"study_design_scores_gemma":[0.00011281313,0.00014422814,0.0017836767,0.00004060847,0.000035584726,0.00013247922,0.00022714218,0.9076461,0.0016411482,0.08655809,0.0016420501,0.00003600172],"about_ca_topic_score_codex":0.005944094,"about_ca_topic_score_gemma":0.003687867,"teacher_disagreement_score":0.021046609,"about_ca_system_score_codex":0.0012847553,"about_ca_system_score_gemma":0.0012400385,"threshold_uncertainty_score":0.07040793},"labels":[],"label_agreement":null},{"id":"W2129589829","doi":"10.1109/epec.2010.5697187","title":"A novel demand side management program using water heaters and particle swarm optimization","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Peaking power plant; Demand response; Computer science; Peak demand; Load management; Electricity; Load balancing (electrical power); Controller (irrigation); Smart grid; Electricity generation; Automotive engineering; Simulation; Power (physics); Engineering; Electrical engineering","score_opus":0.009289970468851329,"score_gpt":0.2065694320579727,"score_spread":0.19727946158912138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129589829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05282542,0.00007382668,0.9401551,0.00014649042,0.0000645867,0.0001361166,0.000035681463,0.0011799627,0.005382849],"genre_scores_gemma":[0.7856951,0.00007480598,0.20626478,0.00010870906,0.000051271403,0.00029528147,0.00007931223,0.000080388236,0.0073504066],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999846,0.00003198675,0.000007874564,0.00003419234,0.000059005364,0.000020980562],"domain_scores_gemma":[0.99982625,0.00007311864,0.000028141958,0.000012630545,0.0000432419,0.000016591284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028581155,0.0005533229,0.00050100376,0.00030779792,0.000312968,0.00046629854,0.00067469093,0.0005108478,0.0019418861],"category_scores_gemma":[0.0004749344,0.00027464158,0.00025715545,0.00022034842,0.00024317652,0.00044816028,0.0004404803,0.000501175,0.00026493942],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041875307,0.0006963349,0.0015904392,0.00016413201,0.00008467975,0.00013390447,0.00018718294,0.68796647,0.03528032,0.006180288,0.0033111644,0.26398626],"study_design_scores_gemma":[0.000034281282,0.000093628114,0.00021363798,0.0000018758734,0.000006514443,0.000010054745,0.000009543302,0.9959965,0.0025121323,0.00038650248,0.00073043007,0.0000049105693],"about_ca_topic_score_codex":0.0033967174,"about_ca_topic_score_gemma":0.0038824126,"teacher_disagreement_score":0.0033967174,"about_ca_system_score_codex":0.00026411898,"about_ca_system_score_gemma":0.0003980605,"threshold_uncertainty_score":0.0067539215},"labels":[],"label_agreement":null},{"id":"W2130577833","doi":"10.1109/iscc.2010.5546765","title":"Using wireless sensor networks for energy-aware homes in smart grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Energy consumption; Computer science; Grid; Wireless; Computer network; Power consumption; Home automation; Scheme (mathematics); Telecommunications; Embedded system; Distributed computing; Computer security; Power (physics); Engineering; Electrical engineering","score_opus":0.012754326662145439,"score_gpt":0.21737710541396887,"score_spread":0.20462277875182344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130577833","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050433394,0.0056356527,0.92920035,0.0015927227,0.00041793517,0.00007391977,0.00005422882,0.00078275497,0.011809017],"genre_scores_gemma":[0.9066701,0.005036522,0.08355985,0.00027025834,0.00018791994,0.00005870091,0.00006412682,0.000027703181,0.004124799],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967813,0.00017349621,0.000013406613,0.000036925667,0.00007813631,0.000019928322],"domain_scores_gemma":[0.9995603,0.0002738216,0.00004530282,0.00004911182,0.00005957784,0.00001185253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005448945,0.00038313743,0.0002865004,0.00022629925,0.0002649356,0.00060255826,0.00049053255,0.0006394065,0.0010743308],"category_scores_gemma":[0.0009415824,0.00017961906,0.00017187791,0.00039517623,0.0003652502,0.0015248727,0.0003628899,0.00044787157,0.00017773513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005684994,0.00022524688,0.0049597747,0.0008109727,0.00020393422,0.00073037646,0.00027252903,0.36750722,0.062337745,0.12748739,0.0112850955,0.42361128],"study_design_scores_gemma":[0.000043017986,0.00021578438,0.0008990223,0.00004590338,0.0000645036,0.00036693,0.0001222092,0.9310577,0.018016208,0.026663553,0.02247641,0.000028822742],"about_ca_topic_score_codex":0.00068491447,"about_ca_topic_score_gemma":0.0013597705,"teacher_disagreement_score":0.0010743308,"about_ca_system_score_codex":0.00027289047,"about_ca_system_score_gemma":0.00020348518,"threshold_uncertainty_score":0.0035940409},"labels":[],"label_agreement":null},{"id":"W2131789327","doi":"10.5547/issn0195-6574-ej-vol31-no3-6","title":"The Effect of Feedback by Text Message (SMS) and Email on Household Electricity Consumption: Experimental Evidence","year":2010,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Consumption (sociology); Quarter (Canadian coin); Control (management); Short Message Service; Business; Advertising; Economics; Computer science; Engineering; Telecommunications; Geography","score_opus":0.009181332522769174,"score_gpt":0.21470493105169902,"score_spread":0.20552359852892985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131789327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9945702,0.00069444656,0.0007234019,0.0002923307,0.000107154345,0.00052216783,0.00007237038,0.000024983357,0.0029928451],"genre_scores_gemma":[0.9929871,0.0009756562,0.0031892115,0.00035327973,0.00020793571,0.0009010266,0.000084044805,0.000014678159,0.0012870318],"study_design_codex":"nonrandomized_trial","study_design_gemma":"nonrandomized_trial","domain_scores_codex":[0.9797737,0.015762802,0.0009612587,0.00110529,0.0017789159,0.00061794807],"domain_scores_gemma":[0.77696365,0.20218217,0.012869516,0.0036042419,0.0020604986,0.0023198887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011569196,0.0008843291,0.0009115188,0.0006412682,0.00068868906,0.0009496346,0.0011861506,0.0017789165,0.008545397],"category_scores_gemma":[0.07541894,0.00065510295,0.001103538,0.00054241036,0.0018166257,0.0016640383,0.0009817539,0.0013866613,0.0007622757],"study_design_candidate":"nonrandomized_trial","study_design_consensus":"nonrandomized_trial","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.2978973,0.32439265,0.03880523,0.009604838,0.0036163046,0.0003840208,0.005557926,0.0026242745,0.01658455,0.0025288826,0.0013602519,0.29664376],"study_design_scores_gemma":[0.06528085,0.7322898,0.1515539,0.0018453574,0.005074244,0.00036586597,0.0021906907,0.0049819276,0.02669084,0.0034843767,0.0060161934,0.00022602857],"about_ca_topic_score_codex":0.0013454208,"about_ca_topic_score_gemma":0.00078581227,"teacher_disagreement_score":0.011569196,"about_ca_system_score_codex":0.0008871336,"about_ca_system_score_gemma":0.00081589294,"threshold_uncertainty_score":0.061184525},"labels":[],"label_agreement":null},{"id":"W2134230984","doi":"10.1109/ccece.2009.5090225","title":"Awater heater model for increased power system efficiency","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Water heater; Reliability (semiconductor); Power demand; Power (physics); Demand side; Water heating; Computer science; Reliability engineering; Engineering; Environmental science; Automotive engineering; Environmental economics; Power consumption; Mechanical engineering; Waste management","score_opus":0.006664434871368845,"score_gpt":0.1829172090787848,"score_spread":0.17625277420741597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134230984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029660717,0.00063736644,0.8243304,0.00090266374,0.00041049518,0.00021153348,0.0011149779,0.00289916,0.13983274],"genre_scores_gemma":[0.77005696,0.0008073709,0.05516535,0.0002869861,0.0001450502,0.00045736774,0.00088068336,0.0006992209,0.171501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974936,0.000049908267,0.000010203695,0.000058125628,0.00009925898,0.00003309338],"domain_scores_gemma":[0.99979836,0.00006191852,0.000018557337,0.000034524037,0.00007825496,0.000008286819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028877848,0.0007992644,0.0006908868,0.00043483108,0.00054051395,0.00090945757,0.0016050746,0.0012547253,0.02589061],"category_scores_gemma":[0.0009151358,0.00031584434,0.0009069801,0.0004166988,0.00027214605,0.0015399673,0.0005178198,0.0013699614,0.0040031974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056664405,0.000068308225,0.00029484555,0.000096804324,0.00003520075,0.00011758731,0.00009535224,0.9251505,0.005635873,0.040852632,0.0050790217,0.022517277],"study_design_scores_gemma":[0.000014803246,0.000019803774,0.0001249114,0.0000054649036,0.000007747169,0.000029080753,0.0000074876893,0.98814195,0.0008528052,0.0040345257,0.0067540086,0.0000073655456],"about_ca_topic_score_codex":0.0062665073,"about_ca_topic_score_gemma":0.0059757144,"teacher_disagreement_score":0.02589061,"about_ca_system_score_codex":0.0007361686,"about_ca_system_score_gemma":0.00073582836,"threshold_uncertainty_score":0.08661276},"labels":[],"label_agreement":null},{"id":"W2135825244","doi":"10.1109/pes.2009.5275857","title":"The operation of a distribution company under uncertainty: An overview","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Task (project management); Computer science; Work (physics); Distribution (mathematics); Operations research; Power (physics); Risk analysis (engineering); Process management; Systems engineering; Business; Engineering","score_opus":0.026105112453288212,"score_gpt":0.25750701096273515,"score_spread":0.23140189850944692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135825244","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04643711,0.73799986,0.16093421,0.0041671186,0.00034245354,0.0001257779,0.0002977198,0.00023365376,0.049462102],"genre_scores_gemma":[0.2623787,0.6923369,0.038920667,0.00045785922,0.0013332465,0.000093007315,0.00023662158,0.00003798855,0.00420499],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99899083,0.00029270683,0.000111049514,0.00014606527,0.000377874,0.00008154628],"domain_scores_gemma":[0.9990392,0.00063663133,0.000090813235,0.00002501533,0.00016754099,0.000040787498],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011551616,0.0009702769,0.0010364293,0.0036536045,0.0006569292,0.004991741,0.00087271875,0.0020454223,0.0013350416],"category_scores_gemma":[0.0012145865,0.00067189167,0.0006683624,0.004424549,0.00089315075,0.0050356165,0.0008160888,0.00084589486,0.00047174352],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032757653,0.00025214127,0.015963446,0.008325953,0.00042847465,0.0027538685,0.0012928491,0.23035033,0.0035097261,0.10938659,0.009050373,0.61835873],"study_design_scores_gemma":[0.000060443006,0.0015016642,0.031462193,0.0078041474,0.00067810586,0.0051917015,0.0049202563,0.34971943,0.0037186753,0.18580306,0.40868667,0.00045368716],"about_ca_topic_score_codex":0.0043665553,"about_ca_topic_score_gemma":0.0039012677,"teacher_disagreement_score":0.004991741,"about_ca_system_score_codex":0.0017981756,"about_ca_system_score_gemma":0.0012293642,"threshold_uncertainty_score":0.013046801},"labels":[],"label_agreement":null},{"id":"W2137119781","doi":"10.1109/greentech.2013.14","title":"A Comfort Based Game Theoretic Approach for Load Management in the Smart Grid","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Scalability; Demand response; Load management; Grid; Overhead (engineering); Distributed computing; Energy management; Energy consumption; Load balancing (electrical power); Energy (signal processing); Reliability engineering; Simulation; Electricity; Engineering; Database","score_opus":0.009420207222165277,"score_gpt":0.18807335465697636,"score_spread":0.1786531474348111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137119781","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007331751,0.000064760156,0.98648363,0.00023603044,0.000025075578,0.000075718504,0.000023274339,0.000073798634,0.0056859767],"genre_scores_gemma":[0.79464984,0.0002454807,0.19690788,0.00025945663,0.000075398035,0.0002588452,0.00004871616,0.00004795448,0.007506513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993598,0.00030770173,0.000021279318,0.000088468885,0.00015011393,0.000072649294],"domain_scores_gemma":[0.99953616,0.00025508617,0.000051443458,0.000027088587,0.000076646145,0.000053576616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008378469,0.00086223637,0.00066869025,0.00037920757,0.0005741089,0.0009949304,0.001128304,0.00085274456,0.0035626988],"category_scores_gemma":[0.0015612503,0.00028100878,0.00053264265,0.00044054267,0.0011755851,0.0015628403,0.0010014814,0.001265296,0.00035390796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007719259,0.00008437682,0.00036272322,0.00006787359,0.00003200662,0.00013362536,0.00016547395,0.8125701,0.0028692975,0.15716934,0.0015585304,0.024909504],"study_design_scores_gemma":[0.00001098879,0.00003714012,0.00004453466,0.0000035688852,0.00000495434,0.000027456641,0.000020487145,0.9743003,0.00032355488,0.024320645,0.00089861825,0.000007649437],"about_ca_topic_score_codex":0.0025991078,"about_ca_topic_score_gemma":0.002784258,"teacher_disagreement_score":0.0035626988,"about_ca_system_score_codex":0.0012792015,"about_ca_system_score_gemma":0.0011977615,"threshold_uncertainty_score":0.011918366},"labels":[],"label_agreement":null},{"id":"W2138320691","doi":"","title":"Reactive power control in distribution systems by using advanced techniques","year":2011,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"AC power; Control (management); Power (physics); Reliability engineering; Voltage; Computer science; Engineering; Electrical engineering","score_opus":0.007732979306857924,"score_gpt":0.1967977557125738,"score_spread":0.18906477640571587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138320691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008029551,0.0022712715,0.9810992,0.00020182785,0.00014281251,0.000033270437,0.000026923186,0.00041524222,0.007779985],"genre_scores_gemma":[0.7608004,0.006480029,0.2204246,0.00016150733,0.00061423687,0.00009202235,0.0000859163,0.00009275399,0.011248464],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998336,0.000033504435,0.000008902278,0.00003121388,0.00008474323,0.000007983292],"domain_scores_gemma":[0.99985313,0.00006393398,0.000024279052,0.000023488075,0.000031404394,0.0000037570494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023076247,0.0003955088,0.00020847461,0.00027062904,0.00016547927,0.0006125914,0.00034193337,0.00029210516,0.0016208052],"category_scores_gemma":[0.0006058181,0.0001171575,0.00018278946,0.00046357056,0.000370575,0.0008214082,0.00027234227,0.0006211255,0.000591914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011997549,0.000062776184,0.00056447566,0.0003957038,0.00005255476,0.0001327119,0.00020431908,0.19268723,0.08040808,0.07072214,0.002861813,0.6517882],"study_design_scores_gemma":[0.000091341644,0.00045242743,0.00090474385,0.00013098682,0.000063890264,0.00035029146,0.00004653016,0.82089794,0.027110666,0.07530017,0.074610226,0.000040798768],"about_ca_topic_score_codex":0.0007777413,"about_ca_topic_score_gemma":0.0010422623,"teacher_disagreement_score":0.0016208052,"about_ca_system_score_codex":0.00021475481,"about_ca_system_score_gemma":0.00016907009,"threshold_uncertainty_score":0.0054221153},"labels":[],"label_agreement":null},{"id":"W2140383608","doi":"10.1002/pip.2302","title":"Empirical assessment of short‐term variability from utility‐scale solar PV plants","year":2012,"lang":"en","type":"article","venue":"Progress in Photovoltaics Research and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Metric (unit); Environmental science; Dispersion (optics); Reliability (semiconductor); Scale (ratio); Grid; Aggregate (composite); Term (time); Power station; Power (physics); Mathematics; Engineering; Geography; Electrical engineering; Cartography; Physics","score_opus":0.06764243321182047,"score_gpt":0.3890760588804786,"score_spread":0.32143362566865813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140383608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981832,0.00003062433,0.0012736862,0.000029301165,0.000002267422,0.00000436842,0.00022808337,0.000015503234,0.00023284691],"genre_scores_gemma":[0.9995504,0.0000111623585,0.00012997017,0.0000023818993,0.000001729903,0.000002012689,0.0002738283,0.0000016511431,0.000026866555],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99967945,0.00010875897,0.000019491079,0.00007194448,0.000085987354,0.000034322937],"domain_scores_gemma":[0.9961128,0.0022539287,0.00059398124,0.00043179997,0.00043718395,0.00017021476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011125479,0.00017482716,0.0002122896,0.0004617995,0.0002050638,0.00045533042,0.0005444965,0.00038987695,0.000323979],"category_scores_gemma":[0.005698716,0.0001708726,0.00035061754,0.00078400184,0.0003688431,0.0004394167,0.0002921765,0.00047450158,0.000087593246],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002457775,0.00014443322,0.6603636,0.000045208955,0.00023273741,0.0003884645,0.00027118574,0.32308835,0.0032098473,0.0009309821,0.00092418515,0.010155223],"study_design_scores_gemma":[0.000014892215,0.000102774124,0.5707464,0.000010658119,0.000028616116,0.00020919644,0.00024378192,0.42617166,0.0011296073,0.00074909907,0.00056236703,0.000030974228],"about_ca_topic_score_codex":0.01584151,"about_ca_topic_score_gemma":0.016308328,"teacher_disagreement_score":0.01584151,"about_ca_system_score_codex":0.0006143873,"about_ca_system_score_gemma":0.00018028963,"threshold_uncertainty_score":0.03149861},"labels":[],"label_agreement":null},{"id":"W2141622557","doi":"10.1109/ptc.2003.1304159","title":"Determination and allocation of typical load profiles to the eligible consumers","year":2004,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fuzzy logic; Cluster analysis; Computer science; Quarter (Canadian coin); Artificial neural network; Load profile; Load balancing (electrical power); Operations research; Machine learning; Artificial intelligence; Engineering; Mathematics; Electrical engineering","score_opus":0.007288216952336371,"score_gpt":0.21075231342089923,"score_spread":0.20346409646856287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141622557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4854165,0.00008594819,0.506286,0.00010761346,0.000013585536,0.00020681153,0.0003321997,0.0007171553,0.0068340916],"genre_scores_gemma":[0.92926025,0.00004291005,0.06914504,0.00001406598,0.0000076740025,0.00008682845,0.00023864153,0.000024332083,0.0011801841],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959725,0.0001003898,0.000024750589,0.00011655898,0.0001114287,0.000049646533],"domain_scores_gemma":[0.99934846,0.0001169875,0.00011631701,0.00007052932,0.00029841685,0.000049273098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042396982,0.0002380666,0.0003730413,0.0009160946,0.00036750335,0.00055533886,0.0003259084,0.00030422062,0.0008739758],"category_scores_gemma":[0.0021788678,0.00015691681,0.0001640978,0.0006620598,0.00015553502,0.0004640332,0.0003340164,0.00021770048,0.00034640037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001022019,0.0002224019,0.07150799,0.00019103863,0.0000679367,0.00021210396,0.0006523543,0.22349378,0.049045157,0.007710375,0.006284106,0.6395907],"study_design_scores_gemma":[0.000026099735,0.0001218455,0.033224225,0.000017245477,0.000023788887,0.00013814043,0.00039414162,0.9377846,0.021440342,0.0041113035,0.0026792353,0.00003893677],"about_ca_topic_score_codex":0.0034439887,"about_ca_topic_score_gemma":0.003391741,"teacher_disagreement_score":0.0034439887,"about_ca_system_score_codex":0.0005141069,"about_ca_system_score_gemma":0.00052893243,"threshold_uncertainty_score":0.0068478584},"labels":[],"label_agreement":null},{"id":"W2141692617","doi":"10.1109/jsac.2012.120706","title":"Optimized Day-Ahead Pricing for Smart Grids with Device-Specific Scheduling Flexibility","year":2012,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":211,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Electricity; Purchasing; Smart grid; Scheduling (production processes); Dynamic pricing; Minification; Flexibility (engineering); Electricity pricing; Real-time computing; Mathematical optimization; Electricity market; Microeconomics; Economics; Operations management","score_opus":0.05627182290679464,"score_gpt":0.289451121055801,"score_spread":0.23317929814900637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141692617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20826523,0.00035629977,0.7858986,0.0004915649,0.00009040461,0.000080429614,0.0001620285,0.00081595016,0.0038395752],"genre_scores_gemma":[0.9461666,0.00005198129,0.052853223,0.000039704755,0.000013028778,0.000023909239,0.00006213211,0.00004535087,0.00074401376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995733,0.00016711642,0.000016996039,0.00007482973,0.00009021765,0.000077517674],"domain_scores_gemma":[0.99918824,0.000502413,0.000092157374,0.00006597556,0.00010231339,0.000048811566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010147893,0.0004846185,0.00090117153,0.00031497562,0.00047325235,0.00092153676,0.0008759296,0.0006401513,0.001423969],"category_scores_gemma":[0.0031354812,0.00046534836,0.0002901415,0.00059124804,0.0004742608,0.0010863469,0.0004197901,0.0007444751,0.00020127113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045073608,0.00001793674,0.0003984211,0.000007680961,0.000007735691,0.000013507016,0.000015673926,0.98785967,0.00028570736,0.0024702048,0.00039349706,0.008484934],"study_design_scores_gemma":[0.0000034873167,0.0000036882404,0.000062823296,3.5346733e-7,0.000001052314,0.0000022877732,0.0000025850175,0.99867886,0.00006735381,0.001119814,0.00005615227,0.000001542803],"about_ca_topic_score_codex":0.011252415,"about_ca_topic_score_gemma":0.013030053,"teacher_disagreement_score":0.011252415,"about_ca_system_score_codex":0.0012740277,"about_ca_system_score_gemma":0.0012514432,"threshold_uncertainty_score":0.022373796},"labels":[],"label_agreement":null},{"id":"W2143298176","doi":"10.1109/surv.2014.020614.00115","title":"Stochastic Information Management in Smart Grid","year":2014,"lang":"en","type":"article","venue":"IEEE Communications Surveys & Tutorials","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Demand response; Electric power system; Energy management; Grid; Electricity; Distributed computing; Power (physics); Engineering; Electrical engineering; Energy (signal processing)","score_opus":0.02090354454878333,"score_gpt":0.24191402828860137,"score_spread":0.22101048373981805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143298176","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016336756,0.021650031,0.93482184,0.0059364126,0.0007025634,0.00012519656,0.0002521519,0.0005813484,0.019593643],"genre_scores_gemma":[0.84915245,0.033588137,0.105842814,0.0009799942,0.0017841534,0.0002852294,0.0004340792,0.00009432727,0.007838904],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998211,0.00064461416,0.00016279786,0.0002724054,0.00056515995,0.00014411942],"domain_scores_gemma":[0.9976981,0.0013342528,0.00021934048,0.00034971413,0.00031760705,0.00008099091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00204836,0.0006000458,0.0011106229,0.0009132614,0.0006796563,0.0030924499,0.0011926674,0.0013578669,0.0018089458],"category_scores_gemma":[0.0049976846,0.00039652415,0.00061582687,0.002568122,0.0013512039,0.0047732964,0.0015498135,0.0018377204,0.00041512738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080069214,0.000060236172,0.0010009716,0.00033528224,0.000063964355,0.00020872141,0.00021907804,0.20532231,0.0009669734,0.6643102,0.008419265,0.11901284],"study_design_scores_gemma":[0.000018495823,0.00005133712,0.00032177783,0.000107099164,0.000029798195,0.00013000467,0.00009582781,0.5946523,0.0006420064,0.38156757,0.022350935,0.000032860866],"about_ca_topic_score_codex":0.0028876252,"about_ca_topic_score_gemma":0.0015297134,"teacher_disagreement_score":0.0030924499,"about_ca_system_score_codex":0.0020117413,"about_ca_system_score_gemma":0.0013960758,"threshold_uncertainty_score":0.014596283},"labels":[],"label_agreement":null},{"id":"W2144135680","doi":"10.1109/saso.2008.64","title":"Load Shifting Agents for Automated Demand Side Management in Micro Energy Grids","year":2008,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bidding; Computer science; Automation; Grid; Energy management; Smart grid; Energy market; Process (computing); Negotiation; Load management; Energy (signal processing); Electricity; Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.014527955268440003,"score_gpt":0.2170407692740991,"score_spread":0.2025128140056591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144135680","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07526661,0.00035341718,0.90875447,0.00045788562,0.00013481901,0.00017419143,0.000056431483,0.0016285293,0.013173582],"genre_scores_gemma":[0.8590524,0.0001474408,0.13367581,0.00010927337,0.000049570557,0.00013184382,0.000051520256,0.00007370153,0.006708438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997484,0.00008719377,0.000013847967,0.000034032113,0.00009147733,0.000025026908],"domain_scores_gemma":[0.9995846,0.00018834916,0.00007489683,0.000067104505,0.000059752267,0.000025288255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003815819,0.0002876982,0.0002671795,0.00016062713,0.00033041503,0.00071765116,0.0005377736,0.00040934613,0.0036271026],"category_scores_gemma":[0.0007589589,0.0001614103,0.00013929496,0.00017220386,0.00025406096,0.00073981856,0.0004569377,0.0005956889,0.000713473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057525473,0.00047194594,0.002482922,0.00019093434,0.00006003668,0.00043730548,0.00040212233,0.5237727,0.055788156,0.10278045,0.0067348056,0.3063034],"study_design_scores_gemma":[0.000048471356,0.000070279595,0.00032817601,0.0000074992718,0.000012572757,0.00006243773,0.000039938008,0.9642486,0.009731308,0.013466654,0.011972294,0.000011697248],"about_ca_topic_score_codex":0.0010037204,"about_ca_topic_score_gemma":0.0016593711,"teacher_disagreement_score":0.0036271026,"about_ca_system_score_codex":0.00022303835,"about_ca_system_score_gemma":0.0003807458,"threshold_uncertainty_score":0.012133837},"labels":[],"label_agreement":null},{"id":"W2150693779","doi":"10.1109/naps.2015.7335103","title":"An autonomous system via fuzzy logic for residential peak load management in smart grids","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; HVAC; Demand response; Computer science; Smart grid; Thermal comfort; Load management; Energy consumption; Automotive engineering; Simulation; Energy management; Air conditioning; Electricity; Peak demand; Real-time computing; Fuzzy logic; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.018227114702603936,"score_gpt":0.23155551377492378,"score_spread":0.21332839907231985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150693779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11090758,0.00030376215,0.8692067,0.00021746615,0.00008816391,0.00020038086,0.00015973255,0.0027385303,0.01617768],"genre_scores_gemma":[0.9565256,0.00008022477,0.040236995,0.000050129314,0.000012052257,0.00007654385,0.000048162296,0.000020113406,0.0029500746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998165,0.000034264223,0.000011246742,0.000046588008,0.00006337437,0.000028144423],"domain_scores_gemma":[0.9999224,0.000023710176,0.00001388304,0.000008613405,0.00002476173,0.000006596013],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027942585,0.00031633404,0.00029402107,0.00025209706,0.0004907928,0.0006434639,0.0005663543,0.00040892608,0.002555905],"category_scores_gemma":[0.00030795438,0.0001332837,0.000329913,0.00016972166,0.00026527734,0.00042677624,0.00025638382,0.0003154736,0.00034896686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005151845,0.00027783192,0.0025044498,0.00025598783,0.00006565847,0.00045341163,0.00038602503,0.72519314,0.05713645,0.018768929,0.002947716,0.19149517],"study_design_scores_gemma":[0.000026692707,0.00009535335,0.0003714432,0.00001194676,0.000022669885,0.00004890549,0.000023439188,0.9868335,0.008113221,0.002252337,0.0021887321,0.000011791462],"about_ca_topic_score_codex":0.0059449677,"about_ca_topic_score_gemma":0.0062926984,"teacher_disagreement_score":0.0059449677,"about_ca_system_score_codex":0.0006047353,"about_ca_system_score_gemma":0.00060537714,"threshold_uncertainty_score":0.011820734},"labels":[],"label_agreement":null},{"id":"W2150787","doi":"10.1139/y90-235","title":"Examining the potential of Advanced Electricity Metering in New Zealand","year":2011,"lang":"en","type":"dissertation","venue":"Canadian Journal of Physiology and Pharmacology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metering mode; Electricity; Engineering; Electrical engineering; Telecommunications; Mechanical engineering","score_opus":0.011975446473980907,"score_gpt":0.22922024937570307,"score_spread":0.21724480290172216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150787","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963554,0.00044032896,0.0019946946,0.00008089148,0.000020065436,0.000012164361,0.000021668158,0.000016864207,0.0010579769],"genre_scores_gemma":[0.9930482,0.000809562,0.0017519331,0.00004039251,0.000009144186,0.000017581877,0.00004654948,0.000005455897,0.0042712544],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9999275,0.0000073295596,0.0000028440595,0.000017361903,0.000028486676,0.000016399259],"domain_scores_gemma":[0.9998983,0.000014577868,0.00003513174,0.00001055001,0.000019315004,0.000022054262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015908762,0.00017186938,0.00012698975,0.00019652,0.00009224028,0.0002021202,0.0001668143,0.00027062,0.0014738167],"category_scores_gemma":[0.00018687305,0.00011427342,0.00015403447,0.00008959352,0.00024688026,0.00026654114,0.00017014539,0.00041711793,0.00021804989],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056040334,0.0001914682,0.002695929,0.000040021583,0.00000923014,0.00011225904,0.000054602166,0.00006913244,0.9839318,0.00026191026,0.000058639715,0.012014471],"study_design_scores_gemma":[0.00013453068,0.010055991,0.06998774,0.000025230094,0.00010391036,0.0007119605,0.0003106255,0.0026602333,0.91080904,0.0006973588,0.0044822865,0.000021150832],"about_ca_topic_score_codex":0.000832367,"about_ca_topic_score_gemma":0.0010601399,"teacher_disagreement_score":0.0014738167,"about_ca_system_score_codex":0.00013076818,"about_ca_system_score_gemma":0.00013826357,"threshold_uncertainty_score":0.004930377},"labels":[],"label_agreement":null},{"id":"W2151232840","doi":"10.1109/ccece.2003.1226462","title":"Distribution system planning using distributed generation","year":2004,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deregulation; Installation; Distributed generation; Electric utility; Computer science; Electricity; Distributed power generation; Electric power industry; Distribution (mathematics); Electric power system; Digital signal processing; Electricity market; Electric power distribution; Risk analysis (engineering); Telecommunications; Business; Power (physics); Engineering; Electrical engineering; Economics; Renewable energy","score_opus":0.022945626441227454,"score_gpt":0.21508553856404275,"score_spread":0.19213991212281528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151232840","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011364832,0.00075288565,0.9743703,0.00029242746,0.000049524446,0.00010467192,0.0003729888,0.00042217516,0.012270295],"genre_scores_gemma":[0.6697818,0.0018142033,0.31451988,0.00006019685,0.000072778064,0.00044568622,0.0008683169,0.0002174638,0.012219695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957365,0.00018959274,0.000016181866,0.000067897425,0.000110680056,0.00004197341],"domain_scores_gemma":[0.99958104,0.0002680663,0.000031430118,0.000016545047,0.00007918232,0.000023690716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005195106,0.00096383196,0.00088081975,0.00097545586,0.00054970704,0.0015058109,0.00058772665,0.00059056375,0.005500388],"category_scores_gemma":[0.0016281164,0.0008543073,0.00055551436,0.0015373161,0.0004913215,0.0009898235,0.0006650229,0.00055285165,0.0005292499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010993318,0.000005396205,0.00009225746,0.000020036163,0.000008031141,0.000030193034,0.00001382964,0.9845918,0.00008358974,0.004551824,0.00046467406,0.01012736],"study_design_scores_gemma":[0.0000107931955,0.000008769133,0.00003769222,0.000007595461,0.0000061471796,0.000007120959,0.000008871604,0.9900802,0.00010399586,0.008210764,0.0015145254,0.000003463911],"about_ca_topic_score_codex":0.016296836,"about_ca_topic_score_gemma":0.025580797,"teacher_disagreement_score":0.016296836,"about_ca_system_score_codex":0.0016903157,"about_ca_system_score_gemma":0.0015083561,"threshold_uncertainty_score":0.032403946},"labels":[],"label_agreement":null},{"id":"W2151291650","doi":"10.1109/ccece.1996.548118","title":"Application of fuzzy logic to electricity pricing in a deregulated environment","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"","keywords":"Fuzzy logic; Electricity; Computer science; Electric power system; Electricity pricing; Mathematical optimization; Operations research; Power (physics); Electricity market; Engineering; Electrical engineering; Artificial intelligence; Mathematics","score_opus":0.008032390074284124,"score_gpt":0.170262450773076,"score_spread":0.16223006069879187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151291650","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041674398,0.0009618181,0.9396376,0.00076407613,0.00018684765,0.000034375014,0.000054750784,0.0001819401,0.016504202],"genre_scores_gemma":[0.85799795,0.0011015265,0.13715318,0.00012873908,0.00010643215,0.000035148045,0.00003462164,0.000024666353,0.0034177357],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959856,0.00016132968,0.000016011627,0.000036902555,0.00015784339,0.000029347946],"domain_scores_gemma":[0.9995721,0.00028100258,0.000036903308,0.000024374644,0.00007289823,0.000012704762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061620615,0.00036578786,0.00037669926,0.00036856768,0.0004075902,0.00092265604,0.00048704166,0.0005943097,0.0014430404],"category_scores_gemma":[0.0019234658,0.00015694105,0.00037862814,0.00044300238,0.0006087393,0.0008505953,0.00040955457,0.0006976999,0.00016360286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009348362,0.000061739716,0.00057477294,0.00008858899,0.00006175479,0.00048210265,0.00016365801,0.75327766,0.0034934809,0.14248051,0.0009944031,0.098227754],"study_design_scores_gemma":[0.000013164812,0.0000306068,0.00012922223,0.0000131637335,0.000009396828,0.000052030566,0.000024713516,0.922986,0.0013140023,0.073156886,0.0022582638,0.000012617999],"about_ca_topic_score_codex":0.0043266863,"about_ca_topic_score_gemma":0.0032573147,"teacher_disagreement_score":0.0043266863,"about_ca_system_score_codex":0.0007889418,"about_ca_system_score_gemma":0.0005270738,"threshold_uncertainty_score":0.008603036},"labels":[],"label_agreement":null},{"id":"W2152729742","doi":"10.1109/ccece.2000.849684","title":"Feasibility study of a cogeneration plant for University of Calgary","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Deregulation; Liberian dollar; Electricity; Collateral; Power station; Profit (economics); Environmental economics; Business; Economics; Engineering; Finance; Electricity generation; Power (physics); Electrical engineering","score_opus":0.03404710627244131,"score_gpt":0.18597575603750524,"score_spread":0.15192864976506393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152729742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9599234,0.0001902387,0.007218692,0.00067924336,0.00005931674,0.0012676643,0.00081982405,0.00018715684,0.02965451],"genre_scores_gemma":[0.9866194,0.00013427032,0.0061469153,0.000072489165,0.000010125058,0.00015959493,0.0006135465,0.000017937502,0.0062258327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988129,0.00027565006,0.00004133602,0.00019391741,0.000375079,0.0003011026],"domain_scores_gemma":[0.998338,0.0005130861,0.00008790643,0.00013976853,0.0005814263,0.00033977683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018966086,0.0006252847,0.00037364973,0.0009090612,0.002377843,0.0020703645,0.0018313393,0.0017715363,0.011024342],"category_scores_gemma":[0.002074478,0.00041834603,0.00062106183,0.00062677753,0.0008369372,0.0015291368,0.00094566314,0.0010794398,0.0011198448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.011516345,0.005324593,0.13109268,0.0023987945,0.00020244646,0.014407225,0.0024866564,0.45480904,0.18317886,0.020499319,0.009831287,0.16425271],"study_design_scores_gemma":[0.0029740557,0.049470577,0.2924717,0.00056133326,0.00043255478,0.002301822,0.03417039,0.36233094,0.13506503,0.0063934233,0.113373905,0.00045425177],"about_ca_topic_score_codex":0.09189309,"about_ca_topic_score_gemma":0.12396397,"teacher_disagreement_score":0.09189309,"about_ca_system_score_codex":0.005964706,"about_ca_system_score_gemma":0.006182791,"threshold_uncertainty_score":0.18271637},"labels":[],"label_agreement":null},{"id":"W2153311188","doi":"10.1109/icassp.2013.6638664","title":"Online control for energy storage management with renewable energy integration","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Renewable energy; Computer science; Energy storage; Lyapunov optimization; Energy management; Control (management); Mathematical optimization; Optimization problem; Energy (signal processing); Engineering; Electrical engineering; Power (physics); Lyapunov equation; Algorithm; Mathematics","score_opus":0.004952601329453686,"score_gpt":0.16962347231514865,"score_spread":0.16467087098569497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153311188","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032914598,0.00065005815,0.9576749,0.00043744015,0.00011131747,0.000059317586,0.000028709672,0.00030562322,0.007818121],"genre_scores_gemma":[0.98064846,0.00020692564,0.015906136,0.00008508612,0.000044262106,0.00005383583,0.000020458463,0.00002750187,0.0030073687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947685,0.00012634507,0.000024388433,0.00011250361,0.00018327312,0.00007670726],"domain_scores_gemma":[0.9995135,0.0002467747,0.00009335771,0.00003727322,0.000087975626,0.00002104357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061294733,0.0007525162,0.0006739355,0.0002027937,0.00035110605,0.0011769824,0.00068608805,0.00071055256,0.002489011],"category_scores_gemma":[0.00124036,0.00032338809,0.00035711515,0.00029000512,0.00067570276,0.0010924668,0.0008128045,0.00088337116,0.0002308683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009428874,0.00013695257,0.0002771517,0.000102693615,0.000034682424,0.000107245054,0.0000622857,0.9280668,0.0068464405,0.023356462,0.00080443185,0.04011054],"study_design_scores_gemma":[0.0000104775745,0.000041801046,0.00006158212,0.0000057739294,0.0000062594468,0.000009842215,0.0000072940807,0.9947989,0.0012256905,0.0033063756,0.0005211607,0.000004843559],"about_ca_topic_score_codex":0.0032970011,"about_ca_topic_score_gemma":0.003567013,"teacher_disagreement_score":0.0032970011,"about_ca_system_score_codex":0.0007675612,"about_ca_system_score_gemma":0.0009950446,"threshold_uncertainty_score":0.00832653},"labels":[],"label_agreement":null},{"id":"W2156117786","doi":"10.1109/infcomw.2011.5928828","title":"Stochastic unit commitment in smart grid communications","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Renewable energy; Computer science; Power system simulation; Grid; Distributed computing; Scheduling (production processes); Demand response; Hidden Markov model; Mathematical optimization; Electric power system; Real-time computing; Power (physics); Electrical engineering; Engineering; Electricity; Artificial intelligence; Mathematics","score_opus":0.062398080647370804,"score_gpt":0.22934071702179512,"score_spread":0.1669426363744243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156117786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022703188,0.0010491,0.96560705,0.0010886391,0.00021637202,0.000044628112,0.00008443838,0.0001836266,0.00902295],"genre_scores_gemma":[0.9426159,0.0012966784,0.047544543,0.00021002544,0.00022861839,0.00012779534,0.0001359678,0.00006596918,0.0077744043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832445,0.00088806223,0.00005631024,0.00021425742,0.0003761264,0.00014089602],"domain_scores_gemma":[0.9972851,0.0019301233,0.00024633654,0.00020113151,0.0002370392,0.000100171725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014425555,0.00068756513,0.0012020676,0.00037767823,0.0005542976,0.0011425485,0.0011859857,0.0011070331,0.0036860243],"category_scores_gemma":[0.0046291226,0.00050282845,0.00048754964,0.0013824155,0.0011679133,0.0015127179,0.0010102056,0.0017678131,0.00049974414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040678988,0.00002069003,0.00020664957,0.00004246638,0.000024739189,0.00010761854,0.000044077482,0.8767469,0.00040274425,0.108228855,0.0014302612,0.012704348],"study_design_scores_gemma":[0.0000059790964,0.000008708491,0.000027609727,0.000003987779,0.0000026238706,0.00001332162,0.000007908758,0.9751966,0.00010240566,0.024214663,0.00041197735,0.000004290193],"about_ca_topic_score_codex":0.0044755167,"about_ca_topic_score_gemma":0.0040952745,"teacher_disagreement_score":0.0044755167,"about_ca_system_score_codex":0.0012996094,"about_ca_system_score_gemma":0.0011942487,"threshold_uncertainty_score":0.012330949},"labels":[],"label_agreement":null},{"id":"W2156762285","doi":"10.1504/ijret.2014.059661","title":"Decentralised operation of residential energy resources in the smart grid","year":2014,"lang":"en","type":"article","venue":"International Journal of Renewable Energy Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distributed generation; Smart grid; Demand response; Grid; Computer science; Energy storage; Electricity; Electric power system; Adaptation (eye); Reliability engineering; Control (management); Distributed computing; Distributed power; Environmental economics; Power (physics); Renewable energy; Engineering; Electrical engineering","score_opus":0.003654961029891317,"score_gpt":0.1933894308454646,"score_spread":0.18973446981557326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156762285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32391313,0.00042077253,0.6598146,0.0004924495,0.000043621014,0.00012943055,0.00006268063,0.0005469877,0.014576333],"genre_scores_gemma":[0.9880157,0.00006293753,0.010834394,0.000015806785,0.0000061859773,0.000017113522,0.000010894545,0.000009094732,0.0010279071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996507,0.00015495445,0.00001502835,0.00006529344,0.0000708784,0.000043170447],"domain_scores_gemma":[0.9996464,0.00012467665,0.00006504524,0.00008007319,0.00005515561,0.00002858375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049087004,0.00024033012,0.0003840244,0.00013826041,0.00026142178,0.000629371,0.00044789253,0.0003140353,0.0012224534],"category_scores_gemma":[0.00079592137,0.0001765666,0.0001995209,0.0001939415,0.00058421126,0.001201905,0.0006130905,0.0005448242,0.00019499581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001509159,0.0000739064,0.0013503183,0.000049154485,0.000035539524,0.00015115256,0.0001334269,0.9404111,0.007246389,0.025898436,0.0004754095,0.024024233],"study_design_scores_gemma":[0.00004022767,0.00008867471,0.0011423851,0.0000072870525,0.000012724453,0.000055243312,0.00010833355,0.9748371,0.0027185683,0.01875419,0.002221736,0.000013513589],"about_ca_topic_score_codex":0.002683575,"about_ca_topic_score_gemma":0.005095806,"teacher_disagreement_score":0.002683575,"about_ca_system_score_codex":0.0005583421,"about_ca_system_score_gemma":0.0004919232,"threshold_uncertainty_score":0.005335927},"labels":[],"label_agreement":null},{"id":"W2161287865","doi":"10.1109/isie.2011.5984354","title":"Peak-load shaving in smart homes via online scheduling","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Peaking power plant; Computer science; Smart grid; Scheduling (production processes); Distributed computing; Load management; Architecture; Load balancing (electrical power); Grid; Energy management system; Electric power system; Real-time computing; Energy management; Power (physics); Energy (signal processing); Engineering","score_opus":0.020519279163192516,"score_gpt":0.20076830906798832,"score_spread":0.1802490299047958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161287865","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15293826,0.00025176353,0.84056115,0.00018283601,0.000049116534,0.000052292457,0.000039391038,0.0017345155,0.004190652],"genre_scores_gemma":[0.97951037,0.000049838243,0.019636555,0.000017019873,0.000011360452,0.000018235105,0.00001761153,0.000033495347,0.00070556154],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997284,0.00008791553,0.00001003941,0.000056714747,0.000062668754,0.000054289627],"domain_scores_gemma":[0.9995055,0.00024453845,0.00007736376,0.0000809651,0.000050444403,0.000041201372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005492569,0.000351203,0.0006608794,0.00023288102,0.00045298986,0.00045957044,0.0006233152,0.00030099807,0.0014500086],"category_scores_gemma":[0.0010494785,0.00023606625,0.00019804102,0.0003031404,0.00050151645,0.00092724187,0.00047538982,0.00045276384,0.00021413894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027751928,0.000125263,0.0007870669,0.00004854702,0.000014551611,0.00010036438,0.00011476783,0.9089401,0.007169724,0.011666702,0.0011945141,0.069561005],"study_design_scores_gemma":[0.000009388617,0.000020275334,0.00008379987,0.0000013035631,0.0000025235743,0.000008494424,0.000012269111,0.99481994,0.0011065719,0.0036551366,0.00027759586,0.0000027589535],"about_ca_topic_score_codex":0.0033500064,"about_ca_topic_score_gemma":0.0035703904,"teacher_disagreement_score":0.0033500064,"about_ca_system_score_codex":0.0005174322,"about_ca_system_score_gemma":0.0006967617,"threshold_uncertainty_score":0.0066610575},"labels":[],"label_agreement":null},{"id":"W2162144622","doi":"10.1109/tpwrs.2014.2340881","title":"A Dynamic Water-Filling Method for Real-Time HVAC Load Control Based on Model Predictive Control","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"HVAC; Demand response; Model predictive control; Computer science; Control theory (sociology); Load regulation; Air conditioning; Process (computing); Renewable energy; Load management; Work (physics); Power (physics); Control engineering; Control (management); Engineering; Electricity; Artificial intelligence","score_opus":0.005185330047122007,"score_gpt":0.2092291637268083,"score_spread":0.2040438336796863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162144622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005125363,0.00019434092,0.9926031,0.00005746301,0.000057578756,0.000026957041,0.000012875892,0.00039096054,0.0015312945],"genre_scores_gemma":[0.84173995,0.00031177435,0.1535974,0.00010858529,0.00009380601,0.00019721524,0.00007560706,0.00007579037,0.0037997833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973243,0.00003745215,0.00001393776,0.00008533127,0.000095895884,0.00003484352],"domain_scores_gemma":[0.9997881,0.00007589812,0.000029131525,0.000018634433,0.000074653544,0.000013663636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003558226,0.00072945433,0.0009766825,0.0003880108,0.00055693224,0.000668515,0.0011233478,0.0005231126,0.00232523],"category_scores_gemma":[0.0006813133,0.00034093962,0.0005476891,0.00042672863,0.000462243,0.0006321456,0.00059990224,0.0009977815,0.00030954185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014935814,0.000107054,0.0003507104,0.00013601159,0.000043095824,0.0000921806,0.00010950861,0.7355485,0.012686765,0.0070024286,0.0021719537,0.24160235],"study_design_scores_gemma":[0.000005944378,0.000018042132,0.0000367294,0.000002040963,0.0000037851773,0.000006429446,0.0000029490718,0.9986412,0.00058816886,0.00036446404,0.00032628095,0.000004044488],"about_ca_topic_score_codex":0.0093033435,"about_ca_topic_score_gemma":0.007382681,"teacher_disagreement_score":0.0093033435,"about_ca_system_score_codex":0.00050251535,"about_ca_system_score_gemma":0.00094863353,"threshold_uncertainty_score":0.018498361},"labels":[],"label_agreement":null},{"id":"W2162234386","doi":"10.1109/ccnc.2011.5766363","title":"Sensor network web services for Demand-Side Energy Management applications in the smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Smart grid; Wireless sensor network; Sensor web; Home automation; Embedded system; Web service; Computer network; Distributed computing; Database; Key distribution in wireless sensor networks; Wireless; Operating system; Wireless network; World Wide Web; Engineering; Electrical engineering","score_opus":0.011447059185905606,"score_gpt":0.18815070296050287,"score_spread":0.17670364377459727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162234386","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06835065,0.0018274172,0.85265195,0.0013435233,0.0003499578,0.00046971807,0.0008497485,0.03215754,0.041999515],"genre_scores_gemma":[0.73264927,0.0018609157,0.24058768,0.0006786244,0.00013448173,0.0003351634,0.0019441968,0.002149017,0.019660627],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939907,0.00018342672,0.000045634097,0.00004676362,0.00025153294,0.00007359665],"domain_scores_gemma":[0.99956304,0.00013842779,0.000038350772,0.000089961126,0.00012811698,0.000042048243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005454084,0.0005577751,0.00038571152,0.00049085106,0.0003873537,0.0011682359,0.0007057119,0.000815847,0.005033777],"category_scores_gemma":[0.0011433755,0.00027504328,0.00044064323,0.0008992639,0.00027472145,0.0019162646,0.0006933854,0.0007579611,0.0023035128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010754581,0.0011012065,0.007707162,0.0013271361,0.00019067395,0.003137717,0.00076184055,0.14768462,0.11568472,0.17087902,0.070100725,0.4803497],"study_design_scores_gemma":[0.000069589776,0.000084481864,0.0023370169,0.000075521275,0.000046360412,0.0006342948,0.00019311202,0.8318647,0.028057607,0.022666346,0.11391805,0.000052943942],"about_ca_topic_score_codex":0.0031647529,"about_ca_topic_score_gemma":0.003035172,"teacher_disagreement_score":0.005033777,"about_ca_system_score_codex":0.0005078919,"about_ca_system_score_gemma":0.000732739,"threshold_uncertainty_score":0.016839683},"labels":[],"label_agreement":null},{"id":"W2163645342","doi":"10.1145/2018536.2018544","title":"Markovian models for home electricity consumption","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Representativeness heuristic; Markov process; Electricity; Computer science; Sizing; Energy consumption; Transformer; Consumption (sociology); Electricity demand; Markov chain; Econometrics; Mathematical optimization; Reliability engineering; Operations research; Electricity generation; Statistics; Machine learning; Engineering; Mathematics; Voltage; Electrical engineering","score_opus":0.041974663609328625,"score_gpt":0.19753795991652584,"score_spread":0.15556329630719723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163645342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111783385,0.00032017878,0.87675476,0.0008127177,0.00006672733,0.00010071942,0.0017365835,0.0008812524,0.007543688],"genre_scores_gemma":[0.95411557,0.00049231946,0.03315967,0.00014822892,0.00008048552,0.0002843501,0.0016970698,0.00015426354,0.009868019],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986552,0.00041525156,0.00007175872,0.00031606978,0.0002993559,0.0002422483],"domain_scores_gemma":[0.99584806,0.002556299,0.000524369,0.00045250877,0.0005012084,0.00011754205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002099636,0.0008292206,0.0010675743,0.0011765049,0.00063530385,0.0013783448,0.002675229,0.0013707868,0.004491816],"category_scores_gemma":[0.0084455395,0.00063525845,0.0011745291,0.0015097233,0.0010918305,0.0025229538,0.00078486756,0.0017044198,0.0008171137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040327042,0.000031406315,0.0010666406,0.000015763768,0.000026185959,0.000044898832,0.00008849873,0.94785255,0.00027847747,0.046679094,0.0006644264,0.0032116482],"study_design_scores_gemma":[0.0000047293975,0.0000055764726,0.00022105126,0.000002692189,0.0000037746663,0.000007487473,0.00000756657,0.9856814,0.000055943838,0.013806189,0.00019813131,0.0000055387513],"about_ca_topic_score_codex":0.027445007,"about_ca_topic_score_gemma":0.024771905,"teacher_disagreement_score":0.027445007,"about_ca_system_score_codex":0.002286244,"about_ca_system_score_gemma":0.0010455223,"threshold_uncertainty_score":0.054570556},"labels":[],"label_agreement":null},{"id":"W2166454355","doi":"10.1109/igcc.2012.6322252","title":"Data centres in the ancillary services market","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Workload; Revenue; Computer science; Energy consumption; Activity-based costing; Data center; Grid; Service (business); Environmental economics; Telecommunications; Business; Computer network; Finance; Marketing; Engineering; Electrical engineering","score_opus":0.01922552246938605,"score_gpt":0.21324412716761332,"score_spread":0.19401860469822726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166454355","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2968515,0.007829141,0.17465189,0.04550362,0.0021671867,0.0006891401,0.0026466942,0.0028794068,0.46678147],"genre_scores_gemma":[0.9471282,0.0015525485,0.01546613,0.0020408283,0.00038518145,0.00014228995,0.0008555744,0.00019254381,0.032236572],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982256,0.00047630075,0.000033866138,0.00027133364,0.00046510022,0.00052776415],"domain_scores_gemma":[0.9968771,0.0012587957,0.000196429,0.00029059328,0.00052903884,0.0008480794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002021901,0.0006911159,0.00078345294,0.00058582576,0.0016059903,0.0061178445,0.0021041299,0.0031179741,0.048068147],"category_scores_gemma":[0.0044237617,0.00041359873,0.0006400302,0.0017165673,0.0011167433,0.006472232,0.0024715967,0.0023810645,0.00480214],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001660336,0.0006542172,0.0064786538,0.00032528408,0.00008039411,0.0014268658,0.00035660778,0.17098762,0.0046019373,0.5897105,0.11025961,0.11345801],"study_design_scores_gemma":[0.00057648943,0.00061459636,0.0032013743,0.0001286166,0.000051374787,0.0009048437,0.0011714177,0.3734909,0.0042876555,0.18587697,0.42953712,0.00015868465],"about_ca_topic_score_codex":0.005346016,"about_ca_topic_score_gemma":0.0035805663,"teacher_disagreement_score":0.048068147,"about_ca_system_score_codex":0.0021452124,"about_ca_system_score_gemma":0.0014821494,"threshold_uncertainty_score":0.16080391},"labels":[],"label_agreement":null},{"id":"W2167374930","doi":"10.1109/pes.2007.385728","title":"Demand Response in Electricity Markets: An Overview","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":913,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity; Electricity market; Load management; Electricity demand; Demand forecasting; Computer science; On demand; Demand management; Demand patterns; Derived demand; Environmental economics; Operations research; Demand curve; Electricity generation; Economics; Microeconomics; Engineering; Power (physics); Electrical engineering","score_opus":0.011362572453355153,"score_gpt":0.2375837016387165,"score_spread":0.22622112918536136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167374930","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013308627,0.7854881,0.103861175,0.007272739,0.0020087687,0.00017055441,0.0003655505,0.0005212797,0.08700327],"genre_scores_gemma":[0.11913622,0.81220144,0.043161202,0.0024583177,0.0056001847,0.0001644506,0.0005905552,0.000120408644,0.016567301],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993161,0.0001914016,0.00006303327,0.00009257069,0.0002684926,0.00006837123],"domain_scores_gemma":[0.9995091,0.00027191394,0.000034466782,0.000016674758,0.0001351054,0.000032765616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080585363,0.000814102,0.00077145087,0.00218077,0.00049961056,0.003485787,0.0008049281,0.0022945353,0.0039515654],"category_scores_gemma":[0.00079845753,0.0004287954,0.0006151449,0.0033529368,0.0005434054,0.003982917,0.00087447476,0.0011984679,0.0014845498],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022056217,0.00042379153,0.0029345846,0.006500464,0.000108557215,0.0008582044,0.00042086546,0.035032783,0.0030398148,0.18992436,0.048577905,0.71195817],"study_design_scores_gemma":[0.00003837109,0.00047123426,0.0046645966,0.002035031,0.000085464075,0.0018001036,0.0009642909,0.050212774,0.0012579304,0.104994446,0.83334297,0.00013275137],"about_ca_topic_score_codex":0.0017193764,"about_ca_topic_score_gemma":0.0011528751,"teacher_disagreement_score":0.0039515654,"about_ca_system_score_codex":0.0010260601,"about_ca_system_score_gemma":0.0007077364,"threshold_uncertainty_score":0.013219357},"labels":[],"label_agreement":null},{"id":"W2168376492","doi":"10.1109/ccece.2011.6030718","title":"Real-time monitoring of energy infrastructure","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Cogeneration; Greenhouse gas; Electricity; Energy consumption; Offset (computer science); Computer science; Smart grid; Grid; Natural gas; Automotive engineering; Systems engineering; Simulation; Engineering; Electricity generation; Waste management; Operating system; Electrical engineering","score_opus":0.008255067947501788,"score_gpt":0.17666624467274092,"score_spread":0.16841117672523914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168376492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.778446,0.00033007792,0.18717131,0.00037214014,0.0000954956,0.00012891911,0.004423321,0.0050742147,0.023958495],"genre_scores_gemma":[0.9929554,0.00007883522,0.005534978,0.000012897793,0.000004049439,0.000017722614,0.00050110574,0.000018596747,0.0008764099],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998436,0.000026048567,0.0000054521884,0.000038556955,0.000070922775,0.000015349538],"domain_scores_gemma":[0.99984884,0.000047194208,0.000028038547,0.000024964269,0.000034825916,0.000016139555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014691561,0.00031504768,0.00021647387,0.00035895727,0.00014004744,0.00041691953,0.00042236815,0.00031507984,0.0013495235],"category_scores_gemma":[0.00053700706,0.00010912519,0.00011862453,0.00035818643,0.00013411388,0.0005714184,0.00021980432,0.00023714887,0.00022487709],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038515468,0.0001331168,0.039188754,0.000121213,0.00008116434,0.00024473536,0.00016473574,0.7858621,0.05689037,0.003917191,0.00513661,0.10787493],"study_design_scores_gemma":[0.000023193916,0.00010906684,0.016354676,0.000008217481,0.000021176586,0.00006642181,0.000074115706,0.9589805,0.016101029,0.0017147654,0.006521759,0.00002507224],"about_ca_topic_score_codex":0.005751457,"about_ca_topic_score_gemma":0.006565506,"teacher_disagreement_score":0.005751457,"about_ca_system_score_codex":0.00037059674,"about_ca_system_score_gemma":0.00030081646,"threshold_uncertainty_score":0.011435986},"labels":[],"label_agreement":null},{"id":"W2172084342","doi":"10.1109/ccece.2009.5090304","title":"A centralized fuzzy controller for aggregated control of domestic water heaters","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Peaking power plant; Peak demand; Controller (irrigation); Electricity; Load management; Fuzzy logic; Computer science; Demand response; Fuzzy control system; Electric power; Control (management); Load profile; Electric power system; Energy storage; Automotive engineering; Power (physics); Engineering; Electrical engineering","score_opus":0.005091861670961626,"score_gpt":0.19992547470361044,"score_spread":0.19483361303264882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172084342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063710935,0.00033578207,0.9248198,0.000184598,0.00019786785,0.00008586496,0.00005963089,0.00122368,0.0093818735],"genre_scores_gemma":[0.98231274,0.000061367406,0.01529708,0.00003909673,0.000036246947,0.000048683214,0.000023481929,0.000009266859,0.0021719867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958986,0.000039964354,0.000021050277,0.00013755924,0.00015182354,0.00005972512],"domain_scores_gemma":[0.9996779,0.000060146976,0.00004417484,0.000028994422,0.00016406404,0.000024632418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046143826,0.00046659558,0.0007070171,0.00026412326,0.00074865343,0.0009420252,0.0012112563,0.00057213445,0.0019980378],"category_scores_gemma":[0.0005297028,0.00021860984,0.0004367955,0.00024355309,0.00046568163,0.00035551266,0.0003645788,0.000753779,0.00033674453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043447816,0.00027810544,0.0010559125,0.00023369641,0.00012286077,0.00042330517,0.00027592853,0.73791426,0.060092576,0.01103598,0.0043333177,0.18379946],"study_design_scores_gemma":[0.000056553603,0.00012705378,0.00033418534,0.000006596465,0.00002180972,0.000042373576,0.000017116783,0.99218154,0.0054396535,0.0008102703,0.0009486445,0.000014272654],"about_ca_topic_score_codex":0.009487156,"about_ca_topic_score_gemma":0.009179926,"teacher_disagreement_score":0.009487156,"about_ca_system_score_codex":0.0008975395,"about_ca_system_score_gemma":0.0011115792,"threshold_uncertainty_score":0.018863857},"labels":[],"label_agreement":null},{"id":"W2172966071","doi":"10.3390/app5041134","title":"An Efficient Power Scheduling Scheme for Residential Load Management in Smart Homes","year":2015,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Mathematical optimization; Regret; Maximization; Computer science; Electricity; Scheduling (production processes); Scheme (mathematics); Convergence (economics); Engineering; Mathematics; Electrical engineering; Economics","score_opus":0.0198468052039694,"score_gpt":0.25312112771627393,"score_spread":0.23327432251230454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172966071","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014105691,0.00014331347,0.9824388,0.00008171201,0.000037167458,0.000047648242,0.000035093995,0.0001896248,0.0029208707],"genre_scores_gemma":[0.8856941,0.00023844802,0.11127079,0.000060366427,0.00005342154,0.000097609256,0.00007749051,0.000040423336,0.0024674123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997856,0.00006588997,0.00001091638,0.000052915108,0.000054882345,0.000029860648],"domain_scores_gemma":[0.99985576,0.000048738224,0.000031399682,0.000020701935,0.000031195883,0.000012193623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037919707,0.00047985837,0.0005969626,0.00019500066,0.00038633088,0.00048298418,0.0007053417,0.00035566115,0.0019483763],"category_scores_gemma":[0.0005808674,0.00018093611,0.0002555704,0.0004400268,0.0002709182,0.0007499301,0.00042547172,0.00043233097,0.00030414175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007403262,0.00007204959,0.0002955256,0.00009262483,0.000020060794,0.00005585643,0.000063113526,0.90591186,0.003971157,0.021612747,0.0020108894,0.06582005],"study_design_scores_gemma":[0.000005480799,0.00001770655,0.000046206802,0.0000019695888,0.0000031503732,0.000011902521,0.000006751716,0.9964341,0.00035408963,0.0025525752,0.00056364696,0.0000023930004],"about_ca_topic_score_codex":0.0014473695,"about_ca_topic_score_gemma":0.0027628818,"teacher_disagreement_score":0.0019483763,"about_ca_system_score_codex":0.00047966198,"about_ca_system_score_gemma":0.00066181883,"threshold_uncertainty_score":0.0065180063},"labels":[],"label_agreement":null},{"id":"W2181266271","doi":"10.19030/jss.v5i2.7577","title":"Consumer Adoption Challenges To The Smart Grid","year":2012,"lang":"en","type":"article","venue":"Journal of Service Science (JSS)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Work (physics); Business; Grid; Key (lock); Computer security; Marketing; Computer science; Risk analysis (engineering); Engineering; Electrical engineering","score_opus":0.026205321627604278,"score_gpt":0.2349675148613069,"score_spread":0.20876219323370263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181266271","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6899328,0.008571126,0.010105681,0.13346884,0.00029143674,0.00022938898,0.00014755779,0.0000752356,0.157178],"genre_scores_gemma":[0.9824697,0.0059803165,0.001986353,0.0047813817,0.000073687355,0.00006638395,0.000036960217,0.000021707203,0.0045834817],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9890625,0.0049587716,0.00031587481,0.00040749303,0.004570587,0.0006847321],"domain_scores_gemma":[0.9870373,0.008169877,0.00090217456,0.00035276808,0.0032231302,0.00031471954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008026799,0.00021285974,0.00028619246,0.0007682757,0.0025146455,0.005286923,0.0005894456,0.0019988394,0.0025462445],"category_scores_gemma":[0.0136590265,0.00020488066,0.00035117049,0.001625186,0.0039375573,0.0057070353,0.0023899456,0.0024694367,0.00022872814],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009405615,0.00016692221,0.039781753,0.001693118,0.00005508927,0.0034597202,0.37200484,0.0010740613,0.0037195585,0.35068193,0.026093105,0.20117593],"study_design_scores_gemma":[0.000015796699,0.00015027217,0.020014523,0.00091482804,0.0000389078,0.0011113443,0.58756715,0.0015415897,0.0015663531,0.046222698,0.34076506,0.00009142118],"about_ca_topic_score_codex":0.016708886,"about_ca_topic_score_gemma":0.020898046,"teacher_disagreement_score":0.016708886,"about_ca_system_score_codex":0.0060346634,"about_ca_system_score_gemma":0.005376382,"threshold_uncertainty_score":0.043784738},"labels":[],"label_agreement":null},{"id":"W2182401036","doi":"","title":"The Ontario Smart Metering Initiative: Will Time-of-Use Pricing Work in Ontario?","year":2007,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metering mode; Work (physics); Business; Operations management; Computer science; Engineering","score_opus":0.017430178632127733,"score_gpt":0.19567297893932695,"score_spread":0.17824280030719922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182401036","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26580557,0.0035870676,0.0011703237,0.59504306,0.00085290166,0.00017799226,0.00405972,0.00010898665,0.1291943],"genre_scores_gemma":[0.8870021,0.0026291478,0.0012917876,0.021555886,0.00021701425,0.000102074504,0.00084898097,0.0000742474,0.086278655],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99560094,0.00051997666,0.000109663655,0.00020930405,0.001664303,0.0018958249],"domain_scores_gemma":[0.9874765,0.0016403551,0.0012048014,0.00025003686,0.0046512177,0.004777078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030862382,0.0001989123,0.00032397592,0.0005718324,0.006391136,0.004776979,0.0017597777,0.0029849284,0.010083931],"category_scores_gemma":[0.013461886,0.000372906,0.0005783599,0.0021268204,0.0024487996,0.002802915,0.0014127345,0.001818105,0.00066284084],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007426936,0.00033575913,0.347229,0.00046908332,0.000113595925,0.00074360677,0.014116639,0.0019585013,0.0012121372,0.09330552,0.42073214,0.11904123],"study_design_scores_gemma":[0.00022153331,0.00014194801,0.5843196,0.00040663916,0.0001320217,0.00015037661,0.02928141,0.002991733,0.00072709785,0.008972892,0.37249258,0.00016206827],"about_ca_topic_score_codex":0.99536514,"about_ca_topic_score_gemma":0.9983456,"teacher_disagreement_score":0.107907556,"about_ca_system_score_codex":0.107907556,"about_ca_system_score_gemma":0.23394576,"threshold_uncertainty_score":0.78292775},"labels":[],"label_agreement":null},{"id":"W2210400726","doi":"10.1109/tsg.2015.2440419","title":"A Correlated Equilibrium Game-Theoretic Approach for Multiple Participants Electric Distribution Systems Operation","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Stochastic game; Nash equilibrium; Smart grid; Mathematical optimization; Game theory; Decision maker; Computer science; Operator (biology); Process (computing); Best response; Electric power system; Mathematics; Engineering; Operations research; Power (physics); Mathematical economics","score_opus":0.032551009811655325,"score_gpt":0.22892988243745205,"score_spread":0.19637887262579673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2210400726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046579163,0.000017651902,0.9929837,0.0000553532,0.000009794415,0.000077234865,0.0000074809536,0.000030239062,0.0021606195],"genre_scores_gemma":[0.6835424,0.00016484124,0.31163463,0.00009428556,0.000024755009,0.00040618872,0.000036931564,0.0000318254,0.004064115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998679,0.0007720132,0.00004068924,0.00015874718,0.0002564251,0.00009306171],"domain_scores_gemma":[0.9990351,0.000543812,0.000111283436,0.00006151929,0.00018463861,0.000063749125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020404847,0.0009605515,0.00067561714,0.0005829836,0.0005888369,0.001111818,0.0018119558,0.00093148113,0.0024419576],"category_scores_gemma":[0.0028381704,0.00034437203,0.00072446564,0.00053760246,0.0013051529,0.0014117924,0.0012220371,0.0013391847,0.00029157652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051827985,0.00008182188,0.00040328488,0.00006373887,0.000048339272,0.00015012365,0.00014792226,0.838756,0.0021621352,0.14132106,0.00051999214,0.016293673],"study_design_scores_gemma":[0.000009873473,0.00004639847,0.000042403422,0.0000041453573,0.000008583149,0.000028848148,0.000023526294,0.9856527,0.00042502757,0.0131603265,0.0005904352,0.000007717503],"about_ca_topic_score_codex":0.0031400956,"about_ca_topic_score_gemma":0.0034758928,"teacher_disagreement_score":0.0031400956,"about_ca_system_score_codex":0.0015309389,"about_ca_system_score_gemma":0.0024043864,"threshold_uncertainty_score":0.011107862},"labels":[],"label_agreement":null},{"id":"W2233229545","doi":"","title":"User-Constrained Algorithms for Aggregate Residential Demand Response Programs with Limited Feedback.","year":2015,"lang":"en","type":"dissertation","venue":"UVic’s Research and Learning Repository (University of Victoria)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Natural Sciences and Engineering Research Council of Canada; Simon Fraser University; University of Victoria","keywords":"Aggregate (composite); Demand response; Computer science; Algorithm; Operations research; Engineering","score_opus":0.02041353371005521,"score_gpt":0.2562992659876643,"score_spread":0.23588573227760906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2233229545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01028356,0.000084786545,0.987035,0.00012933338,0.000019731888,0.00010402144,0.00007070015,0.0006521824,0.0016206584],"genre_scores_gemma":[0.6042435,0.00014307904,0.39032018,0.00022276951,0.000051176965,0.0006054943,0.00042168246,0.00027204817,0.003719965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981711,0.00079885474,0.00009264098,0.00033338682,0.00038142005,0.0002226236],"domain_scores_gemma":[0.9922557,0.0058982433,0.00046320638,0.0004628562,0.0007516331,0.00016844487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036705292,0.0012482948,0.0012759482,0.00064501516,0.0006761421,0.0014058757,0.002039538,0.0015851326,0.004443576],"category_scores_gemma":[0.012421596,0.00069196016,0.00072472217,0.00095932867,0.0008912392,0.0022432331,0.0018161183,0.0019341746,0.00091561856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013680602,0.00009626753,0.00045761804,0.000036141388,0.000019480889,0.00001799186,0.000053196392,0.9652331,0.00040502945,0.0076070996,0.0009887925,0.024948575],"study_design_scores_gemma":[0.000006110631,0.000010310968,0.000021518286,0.000001642524,0.000001440746,0.000003224028,0.000004419467,0.99823004,0.00012700069,0.0014805404,0.00011214904,0.0000017011257],"about_ca_topic_score_codex":0.008914804,"about_ca_topic_score_gemma":0.0077511715,"teacher_disagreement_score":0.008914804,"about_ca_system_score_codex":0.0018365958,"about_ca_system_score_gemma":0.0025947283,"threshold_uncertainty_score":0.019411862},"labels":[],"label_agreement":null},{"id":"W2240184912","doi":"10.1109/epec.2015.7379994","title":"Appliance scheduling optimization in smart home networks comprising of smart appliances and a photovoltaic panel","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Scheduling (production processes); Smart grid; Computer science; Schedule; Electricity; Grid; Home automation; Demand response; Job shop scheduling; Real-time computing; Distributed computing; Engineering; Embedded system; Electrical engineering; Telecommunications; Operations management","score_opus":0.02752245214106635,"score_gpt":0.2120539909722505,"score_spread":0.18453153883118414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2240184912","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15395069,0.0006005356,0.839223,0.00034339097,0.00008859599,0.000069732116,0.00011452528,0.000259171,0.0053503187],"genre_scores_gemma":[0.923844,0.00037617685,0.07124102,0.0000599266,0.00007449419,0.00007241824,0.00013176192,0.00006434442,0.0041358247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999739,0.000094946285,0.000008842548,0.00006706324,0.0000360238,0.00005420794],"domain_scores_gemma":[0.99976534,0.00012762287,0.000048276648,0.0000120830055,0.000024765612,0.000021919324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045194046,0.0006422704,0.00079247,0.0002826982,0.00040843192,0.00060500886,0.0006119393,0.00057962944,0.001389047],"category_scores_gemma":[0.00059338374,0.00033833052,0.00036794576,0.00054668693,0.00031789436,0.00082114834,0.0003805774,0.00043956251,0.0001622779],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053088974,0.00003958949,0.00036017332,0.000027480435,0.000017727853,0.00005144951,0.000016630382,0.98284435,0.001502781,0.0024480866,0.0004594586,0.012179186],"study_design_scores_gemma":[0.0000070009573,0.000029758256,0.00013988302,0.000001305377,0.000005329035,0.000012753114,0.000014584098,0.9971615,0.00037307685,0.0018929503,0.00035977576,0.0000021625087],"about_ca_topic_score_codex":0.0031098435,"about_ca_topic_score_gemma":0.0036317618,"teacher_disagreement_score":0.0031098435,"about_ca_system_score_codex":0.00064233126,"about_ca_system_score_gemma":0.0006136105,"threshold_uncertainty_score":0.006183505},"labels":[],"label_agreement":null},{"id":"W2241256076","doi":"10.1109/epec.2015.7379942","title":"Model predictive control based home energy management system in smart grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Model predictive control; Smart grid; Computer science; Energy management; Control (management); Energy management system; Grid; Energy (signal processing); Engineering; Artificial intelligence; Electrical engineering","score_opus":0.010206831935784423,"score_gpt":0.17090971545936867,"score_spread":0.16070288352358425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2241256076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12308885,0.0012507864,0.8188302,0.0008050017,0.0003803946,0.0002360459,0.00032470076,0.009959299,0.045124862],"genre_scores_gemma":[0.9773641,0.00023690869,0.015825199,0.00010238936,0.000027676979,0.000088029934,0.00014096015,0.000028069,0.0061865337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984753,0.00002733295,0.00000814594,0.00004127778,0.000055858105,0.000019769535],"domain_scores_gemma":[0.99991417,0.000018866038,0.0000135299115,0.000012643225,0.00003400203,0.0000067771443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021748905,0.00036005845,0.0005884871,0.00017319997,0.00044086002,0.0007954456,0.00064409187,0.00040428314,0.0029532937],"category_scores_gemma":[0.00026620665,0.0001775622,0.0002074645,0.00022271897,0.00023655743,0.0004884518,0.0003961135,0.00055824313,0.00066552474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000457593,0.00047505248,0.0022476055,0.0002997253,0.000087661014,0.0006339481,0.00021324237,0.7391259,0.028079696,0.008934366,0.011938741,0.20750648],"study_design_scores_gemma":[0.000032465818,0.00012045191,0.00037830608,0.00000894966,0.000014996037,0.000046387002,0.000015982605,0.99192905,0.0036390817,0.0015153646,0.0022898254,0.000009086608],"about_ca_topic_score_codex":0.0054568155,"about_ca_topic_score_gemma":0.0054286113,"teacher_disagreement_score":0.0054568155,"about_ca_system_score_codex":0.00034588328,"about_ca_system_score_gemma":0.000521427,"threshold_uncertainty_score":0.010850072},"labels":[],"label_agreement":null},{"id":"W2244906720","doi":"10.1109/epec.2015.7379949","title":"An evolutionary game approach to predict demand response from real-time pricing","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Dynamic pricing; Schedule; Demand response; Incentive; Consumption (sociology); Outcome (game theory); Computer science; Microeconomics; Population; Pricing strategies; Response time; Economics; Engineering","score_opus":0.013327687157475657,"score_gpt":0.20723286604952393,"score_spread":0.19390517889204828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2244906720","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11050557,0.00014645174,0.8817398,0.0005470214,0.00006825437,0.00010269076,0.00012527673,0.00011957182,0.0066453028],"genre_scores_gemma":[0.94654304,0.00018302392,0.047207747,0.00011789997,0.000027461296,0.00016303932,0.00008492793,0.000024397066,0.0056484933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953556,0.00021493819,0.00001801905,0.00009038786,0.0000816964,0.000059347945],"domain_scores_gemma":[0.998128,0.0013912249,0.00015716537,0.000056690962,0.0001867122,0.00008027558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013677503,0.0007173407,0.00085494213,0.0006176585,0.00030461853,0.00085007836,0.0012852681,0.0012333844,0.0021872865],"category_scores_gemma":[0.005282752,0.00044262296,0.00071255164,0.0004780632,0.00073787634,0.0012395664,0.0005749911,0.0012059285,0.00016154641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014173796,0.000023893785,0.0006071879,0.000009321413,0.00002209344,0.00005520819,0.000027270415,0.9865382,0.0002933549,0.010019815,0.00012736833,0.0022620694],"study_design_scores_gemma":[0.00000188258,0.0000061814785,0.00007012029,7.4057755e-7,0.0000026134267,0.0000041568696,0.0000027191231,0.99824846,0.000025788631,0.0015907419,0.00004442633,0.0000022487868],"about_ca_topic_score_codex":0.012440963,"about_ca_topic_score_gemma":0.0076094624,"teacher_disagreement_score":0.012440963,"about_ca_system_score_codex":0.0011940486,"about_ca_system_score_gemma":0.00086390326,"threshold_uncertainty_score":0.02473706},"labels":[],"label_agreement":null},{"id":"W2245031077","doi":"10.1109/epec.2015.7379973","title":"A basic load following control strategy in a direct load control program","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Intermittency; Control (management); Wind power; Controller (irrigation); Load balancing (electrical power); Computer science; Load profile; Grid; Reliability (semiconductor); Load following power plant; Control system; Load management; Automotive engineering; Reliability engineering; Renewable energy; Engineering; Base load power plant; Distributed generation; Electricity; Electrical engineering","score_opus":0.013045605457623743,"score_gpt":0.2259313974802323,"score_spread":0.21288579202260857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2245031077","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30651918,0.00022352817,0.6036442,0.0003532068,0.00024986788,0.0017620494,0.00047182594,0.011721384,0.07505474],"genre_scores_gemma":[0.9488926,0.00006801091,0.036379345,0.00016302448,0.000035084486,0.0003589278,0.00015360618,0.000068242145,0.01388118],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977034,0.00001730834,0.000014028704,0.00008357424,0.000085613196,0.000029145622],"domain_scores_gemma":[0.9998264,0.000025867947,0.00002370921,0.000034775814,0.000069344365,0.000019911953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011616444,0.00049829856,0.0003553539,0.00033407533,0.00044338222,0.0007662968,0.00081176264,0.00040860052,0.006868938],"category_scores_gemma":[0.00026205936,0.00016753993,0.00017369182,0.00017633139,0.0002866116,0.00035295842,0.00029637417,0.00045382875,0.0015152992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010574412,0.0016924716,0.003055849,0.0004365285,0.000055450677,0.00038843518,0.00050718396,0.04370249,0.4237573,0.0050949203,0.0062299436,0.51402193],"study_design_scores_gemma":[0.0004104795,0.002056877,0.009536952,0.000070865506,0.00006683152,0.00050138077,0.00012106172,0.7335921,0.21944849,0.0024403934,0.03166305,0.00009149799],"about_ca_topic_score_codex":0.0047839074,"about_ca_topic_score_gemma":0.004670617,"teacher_disagreement_score":0.006868938,"about_ca_system_score_codex":0.00028800586,"about_ca_system_score_gemma":0.00048574118,"threshold_uncertainty_score":0.022978842},"labels":[],"label_agreement":null},{"id":"W2246825951","doi":"10.1109/rtss.2015.10","title":"Distributed Deadline and Renewable Aware Electric Vehicle Demand Response in the Smart Grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Smart grid; Electric vehicle; Computer science; Renewable energy; Flexibility (engineering); Grid; Inefficiency; Hierarchy; Peak demand; Environmental economics; Electricity; Power (physics); Engineering; Economics; Electrical engineering; Microeconomics; Market economy","score_opus":0.013595247133597471,"score_gpt":0.20705029946908823,"score_spread":0.19345505233549076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2246825951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07528601,0.0005685376,0.9097471,0.0008622857,0.00020970876,0.00013027547,0.00016105907,0.0006069739,0.012428122],"genre_scores_gemma":[0.9615881,0.00021455712,0.03349345,0.00013866212,0.000055847773,0.00007168808,0.00007404981,0.000039475908,0.0043242187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993494,0.00015453105,0.000033571258,0.00019955567,0.00014331107,0.00011957975],"domain_scores_gemma":[0.9993777,0.00023353499,0.00010632192,0.00007765544,0.00013614482,0.00006864862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084310054,0.00049484987,0.00058363465,0.00025824463,0.00042423117,0.0010374809,0.0013099012,0.00077492895,0.0031253996],"category_scores_gemma":[0.00151794,0.0002794485,0.0004315653,0.00043437225,0.00049850834,0.0014675125,0.00081093656,0.00076349673,0.0005143037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003896753,0.00021513677,0.0014796719,0.00026100257,0.000048790003,0.00051982206,0.00016922211,0.7988268,0.019208387,0.0980282,0.0046013617,0.07625186],"study_design_scores_gemma":[0.000025781299,0.000070578564,0.00019023693,0.000005080901,0.0000088087145,0.000052902968,0.000037854406,0.9807402,0.0017715892,0.014692593,0.0023933314,0.000011086072],"about_ca_topic_score_codex":0.001722468,"about_ca_topic_score_gemma":0.0019952015,"teacher_disagreement_score":0.0031253996,"about_ca_system_score_codex":0.00093347963,"about_ca_system_score_gemma":0.00081170077,"threshold_uncertainty_score":0.010455489},"labels":[],"label_agreement":null},{"id":"W2247142144","doi":"10.1109/epec.2015.7379950","title":"A distributed game theoretic approach to energy trading in the smart grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Grid; Profit (economics); Energy (signal processing); Game theory; Distributed generation; Distributed computing; Mathematical optimization; Renewable energy; Microeconomics; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.01865532845281135,"score_gpt":0.19517867067138964,"score_spread":0.1765233422185783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247142144","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008962466,0.00026409666,0.9812407,0.00039826462,0.00008179188,0.000075011936,0.000032892338,0.00004816897,0.008896568],"genre_scores_gemma":[0.85395575,0.00071909686,0.13675134,0.00026259845,0.0001291523,0.0002881633,0.000047813748,0.000034269764,0.0078117517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865085,0.00077959785,0.000040328665,0.00015831893,0.00027723343,0.00009358471],"domain_scores_gemma":[0.9992322,0.0004968383,0.000066270695,0.000050117145,0.00009123421,0.00006336609],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013207506,0.00095447386,0.0012121241,0.00047619097,0.00059982506,0.0015395597,0.0017182522,0.0013459418,0.0026070275],"category_scores_gemma":[0.0020895943,0.00040223074,0.0007857842,0.0007831029,0.0017097043,0.002186629,0.0012139035,0.0015995884,0.00025359725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005013015,0.00006906952,0.00022254193,0.000061940504,0.00003833084,0.00014895585,0.00006906813,0.7847538,0.0008842588,0.20477968,0.00068410067,0.008238081],"study_design_scores_gemma":[0.000025609377,0.000035314122,0.000037726906,0.000004932273,0.0000074497902,0.000037329464,0.000020256077,0.9444965,0.00014702114,0.054085102,0.0010949919,0.000007723187],"about_ca_topic_score_codex":0.0025381723,"about_ca_topic_score_gemma":0.002431129,"teacher_disagreement_score":0.0026070275,"about_ca_system_score_codex":0.0013371283,"about_ca_system_score_gemma":0.001399122,"threshold_uncertainty_score":0.00970155},"labels":[],"label_agreement":null},{"id":"W2247506721","doi":"10.1109/tie.2015.2492946","title":"Distributed MPC of Aggregated Heterogeneous Thermostatically Controlled Loads in Smart Grid","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Smart grid; Model predictive control; Grid; Computer science; Population; Scheme (mathematics); Aggregate (composite); Function (biology); Distributed computing; Control theory (sociology); Control engineering; Control (management); Engineering; Mathematics; Artificial intelligence","score_opus":0.02667356529660642,"score_gpt":0.22165942163768299,"score_spread":0.19498585634107657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247506721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28905028,0.00032020756,0.70363426,0.00029449162,0.00006530791,0.000037989972,0.00009020937,0.0005044759,0.006002801],"genre_scores_gemma":[0.9964181,0.000042088832,0.002748526,0.000011205073,0.0000067499336,0.000010206092,0.000015493883,0.000008018314,0.0007395885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986994,0.000034732915,0.000004110913,0.000032798143,0.000032828502,0.00002563283],"domain_scores_gemma":[0.9998485,0.00006001324,0.000037905542,0.00001703675,0.000025295896,0.000011250148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000308234,0.0004819393,0.0005820881,0.00015012643,0.0002854654,0.0004822143,0.00043108134,0.00026151226,0.0005075894],"category_scores_gemma":[0.000531961,0.00019853751,0.00027950975,0.00028380164,0.0004018896,0.000495132,0.00043288045,0.0005143642,0.00007935061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002178563,0.000008415786,0.00018088114,0.0000071084355,0.000005607005,0.000022213324,0.000012215482,0.99344385,0.0007531538,0.0010799933,0.00011889385,0.0043459944],"study_design_scores_gemma":[0.0000016563035,0.0000052760247,0.000049384777,3.2522303e-7,8.867245e-7,0.0000010520257,0.0000016416659,0.9994342,0.0001042311,0.00035508652,0.000045733774,6.1230315e-7],"about_ca_topic_score_codex":0.010383344,"about_ca_topic_score_gemma":0.0067869327,"teacher_disagreement_score":0.010383344,"about_ca_system_score_codex":0.0006209704,"about_ca_system_score_gemma":0.00044724677,"threshold_uncertainty_score":0.020645797},"labels":[],"label_agreement":null},{"id":"W2248624141","doi":"10.1109/epec.2015.7379983","title":"Application of wavelet-based ensemble tree classifier for non-intrusive load monitoring","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Wavelet; Daubechies wavelet; Classifier (UML); Pattern recognition (psychology); Artificial intelligence; Decision tree; Computer science; Ensemble learning; Decision tree learning; Discrete wavelet transform; Machine learning; Wavelet transform; Data mining","score_opus":0.02187375872455487,"score_gpt":0.2354163424159998,"score_spread":0.2135425836914449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248624141","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16403466,0.0009890704,0.8301222,0.0002849763,0.00026148502,0.000092609014,0.00026821723,0.0010853934,0.0028614148],"genre_scores_gemma":[0.8173751,0.00073598203,0.17873563,0.00008819087,0.00014574494,0.00007593667,0.0005475578,0.00006401385,0.002231707],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924904,0.00013243352,0.00005797533,0.00011929665,0.00036796628,0.00007327986],"domain_scores_gemma":[0.99844307,0.0005516053,0.000109716806,0.0001331377,0.00070204196,0.000060501297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001108998,0.0006349304,0.0010619248,0.0012843601,0.0004614409,0.0007930313,0.0007151963,0.000709852,0.0006923292],"category_scores_gemma":[0.00298647,0.000159072,0.0006153226,0.0011332948,0.00014253783,0.0011469556,0.00039890857,0.00083477923,0.00037661704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040634768,0.00035303595,0.012238319,0.00013503026,0.00024084836,0.00032706148,0.00015175273,0.13416964,0.034100242,0.0021014027,0.0036928423,0.8120835],"study_design_scores_gemma":[0.000006889491,0.00016141389,0.002661953,0.000010873364,0.000056574834,0.0001422979,0.000036075882,0.9860723,0.008687828,0.0009981539,0.001149598,0.000016090155],"about_ca_topic_score_codex":0.001966276,"about_ca_topic_score_gemma":0.0023170887,"teacher_disagreement_score":0.001966276,"about_ca_system_score_codex":0.00031606635,"about_ca_system_score_gemma":0.00038796457,"threshold_uncertainty_score":0.0058650374},"labels":[],"label_agreement":null},{"id":"W2249348700","doi":"10.1109/epec.2015.7379946","title":"Performance assessment tool for remote electrical microgrids (PATREM)","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Natural Resources Canada","funders":"","keywords":"Microgrid; Electricity; Smart grid; Grid; Computer science; Renewable energy; Electricity generation; Systems engineering; Environmental economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.01614866621310581,"score_gpt":0.2382831101123979,"score_spread":0.22213444389929207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2249348700","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050777573,0.000380371,0.808509,0.00031046025,0.00011742146,0.000683127,0.011281592,0.08437934,0.043561224],"genre_scores_gemma":[0.34273928,0.0005656262,0.6253569,0.00019530504,0.00005893943,0.0013677245,0.013054524,0.0046519577,0.012009703],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891114,0.00022996226,0.00013098818,0.00012088529,0.0005436324,0.000063452935],"domain_scores_gemma":[0.99705267,0.001563055,0.00034989105,0.00032384114,0.00063987623,0.00007062343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019080489,0.0016860313,0.00065915147,0.0024346714,0.00032046263,0.001563569,0.0014129248,0.0006504107,0.016195774],"category_scores_gemma":[0.005850976,0.00043159368,0.0009724795,0.0013600813,0.00022780403,0.0019926378,0.0011726778,0.0009195226,0.0046718763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064163364,0.0008205657,0.009189317,0.0017613209,0.00028864923,0.00070724497,0.00057997735,0.25428408,0.02948173,0.02052372,0.063327424,0.61839426],"study_design_scores_gemma":[0.00024469997,0.00075104827,0.010592912,0.00037768748,0.00015810895,0.0010410475,0.0003020568,0.8103374,0.04369056,0.01902528,0.113271184,0.00020807024],"about_ca_topic_score_codex":0.0011002581,"about_ca_topic_score_gemma":0.0009402641,"teacher_disagreement_score":0.016195774,"about_ca_system_score_codex":0.00039280043,"about_ca_system_score_gemma":0.0007537582,"threshold_uncertainty_score":0.054180264},"labels":[],"label_agreement":null},{"id":"W2254492236","doi":"","title":"Coordinated Operation of Distributed Energy Resources in Renewables Based Microgrids under Uncertainties","year":2014,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo","keywords":"Renewable energy; Distributed generation; Microgrid; Computer science; Energy (signal processing); Environmental economics; Distributed computing; Engineering; Environmental science; Electrical engineering; Economics; Physics","score_opus":0.004949447171886276,"score_gpt":0.16406176936370018,"score_spread":0.1591123221918139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2254492236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5789813,0.0008985195,0.40747648,0.00044431223,0.00007738305,0.000106151565,0.0004164484,0.000550015,0.0110494075],"genre_scores_gemma":[0.9969374,0.00011199121,0.0023612045,0.000012492206,0.0000069531584,0.000021505364,0.00003350943,0.000010707061,0.00050425134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929667,0.0002681634,0.000035670244,0.00013916103,0.00013087838,0.00012942738],"domain_scores_gemma":[0.9988925,0.00056809804,0.00026596565,0.00007072002,0.00013084617,0.000071837465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001048332,0.00080385985,0.0011903023,0.0003042882,0.0005110888,0.0015172621,0.00076025754,0.00053106406,0.000764418],"category_scores_gemma":[0.0021445355,0.00045322263,0.00066649425,0.0005856831,0.0008063937,0.00093972444,0.0010233476,0.00060734816,0.00013361659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002356631,0.0000044568765,0.0002285996,0.00000950619,0.000011584339,0.000047092115,0.000013978018,0.99737585,0.00021239738,0.0009791,0.000057225054,0.0010367002],"study_design_scores_gemma":[0.000006320058,0.000025355614,0.00023857942,0.0000029577425,0.000008743749,0.000007937159,0.000028396236,0.9978629,0.00019071597,0.0015214009,0.00010231233,0.000004397866],"about_ca_topic_score_codex":0.011672682,"about_ca_topic_score_gemma":0.006826835,"teacher_disagreement_score":0.011672682,"about_ca_system_score_codex":0.0012984434,"about_ca_system_score_gemma":0.0009925932,"threshold_uncertainty_score":0.023209453},"labels":[],"label_agreement":null},{"id":"W2266287845","doi":"10.1007/s11431-012-4844-3","title":"Active power regulation of wind power systems through demand response","year":2012,"lang":"en","type":"article","venue":"Science China Technological Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Wind power; Power (physics); Electric power system; Environmental science; Electrical engineering; Engineering; Physics; Electricity","score_opus":0.014928516748151354,"score_gpt":0.24375957273100923,"score_spread":0.22883105598285788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266287845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6058678,0.0003474873,0.35681546,0.000907969,0.0003033302,0.00007322796,0.00038038765,0.0013351545,0.033969183],"genre_scores_gemma":[0.99736124,0.000032776406,0.0016417325,0.00002056401,0.000013105407,0.0000072028442,0.000041692652,0.000018156712,0.00086349394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984634,0.00005082422,0.000010586025,0.000031785876,0.000042451455,0.000018001496],"domain_scores_gemma":[0.99954385,0.00024032748,0.000060350627,0.000039184226,0.00010018502,0.000016075744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021542564,0.00022278375,0.00024995764,0.00015147043,0.00014929348,0.0005715709,0.0003050306,0.00020594674,0.0012982177],"category_scores_gemma":[0.0010318593,0.00017444634,0.000119923934,0.00017045962,0.00016356418,0.0005186979,0.00017103025,0.00039685692,0.00029273162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015135776,0.0005548078,0.008858181,0.00034648366,0.00016172748,0.0005397975,0.0003009137,0.64136827,0.11450239,0.023118706,0.007315841,0.20141932],"study_design_scores_gemma":[0.000030961295,0.00007614368,0.002340032,0.000006062277,0.000016838549,0.000051064122,0.00003353328,0.9864276,0.0059354375,0.0038863118,0.0011853498,0.000010648378],"about_ca_topic_score_codex":0.0007364615,"about_ca_topic_score_gemma":0.0014880678,"teacher_disagreement_score":0.0012982177,"about_ca_system_score_codex":0.00016261928,"about_ca_system_score_gemma":0.00012918992,"threshold_uncertainty_score":0.004342973},"labels":[],"label_agreement":null},{"id":"W2268711958","doi":"10.1109/ipsc.2015.7827754","title":"Stochastic optimization of demand response aggregators in wholesale electricity markets","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"News aggregator; Demand response; CVAR; Electricity market; Electricity; Stochastic optimization; Stochastic programming; Load management; Computer science; Mathematical optimization; Business; Operations research; Microeconomics; Expected shortfall; Economics; Risk management; Engineering; Finance; Mathematics","score_opus":0.009564120439668047,"score_gpt":0.19912650737592538,"score_spread":0.18956238693625732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2268711958","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10054556,0.00066826504,0.88344145,0.0014007897,0.00010532186,0.000105462175,0.00027463833,0.000207884,0.013250609],"genre_scores_gemma":[0.97846824,0.00028208096,0.0153801255,0.00010742598,0.00005229137,0.00009452955,0.000106645195,0.00005430374,0.005454439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975568,0.0013422689,0.00007246078,0.0003466772,0.00031214714,0.00036963227],"domain_scores_gemma":[0.9978635,0.0013704589,0.00033722978,0.00006668015,0.00022405658,0.00013807636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028534676,0.0011769442,0.0014911303,0.00042792584,0.0005463689,0.001984027,0.0014459946,0.001582302,0.0026827739],"category_scores_gemma":[0.0043236655,0.001022007,0.00090807944,0.0007226536,0.001199105,0.0014450365,0.0011969836,0.0014927605,0.00021897157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034393757,0.000016073975,0.00014117506,0.000018372732,0.000019522357,0.000057824138,0.000016996908,0.9761628,0.0002910603,0.021860668,0.0003066871,0.0010743889],"study_design_scores_gemma":[0.000009082706,0.000012543629,0.000065074586,0.0000018130693,0.0000039035,0.0000070226483,0.000011341922,0.99396074,0.00005589525,0.0057053487,0.00016325648,0.0000040425602],"about_ca_topic_score_codex":0.0078634145,"about_ca_topic_score_gemma":0.006093821,"teacher_disagreement_score":0.0078634145,"about_ca_system_score_codex":0.0019403887,"about_ca_system_score_gemma":0.0014186436,"threshold_uncertainty_score":0.015635252},"labels":[],"label_agreement":null},{"id":"W2270393492","doi":"10.2139/ssrn.2360552","title":"Limit Order Books with Stochastic Market Depth","year":2013,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Limit (mathematics); Order (exchange); Order book; Mathematical economics; Economics; Statistical physics; Mathematics; Financial economics; Physics; Mathematical analysis; Finance","score_opus":0.0036026572142088386,"score_gpt":0.16572024919327236,"score_spread":0.16211759197906353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2270393492","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3534717,0.0035040735,0.5516858,0.008829691,0.00037654987,0.0001949813,0.0022997155,0.0018989797,0.07773852],"genre_scores_gemma":[0.88506603,0.0014301045,0.016863337,0.0005364462,0.00044417012,0.00016388671,0.00058380706,0.0002663157,0.09464594],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789196,0.00060067326,0.0001239434,0.00034952478,0.00060957304,0.0004244125],"domain_scores_gemma":[0.96294856,0.025095874,0.004759209,0.00251122,0.0022450422,0.0024401124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041634855,0.0011006189,0.0031587365,0.0024667752,0.0011782404,0.0052225557,0.003271914,0.0043927953,0.022255192],"category_scores_gemma":[0.04347924,0.0022477326,0.001450021,0.0029193384,0.0036605091,0.012978509,0.0028156089,0.004086959,0.0023794272],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028234234,0.0001251869,0.0014161373,0.00015541147,0.00004820037,0.00049404526,0.00017793375,0.14125367,0.00059426867,0.8396024,0.006158399,0.009691955],"study_design_scores_gemma":[0.00009707223,0.00006953184,0.0006183314,0.00003165203,0.000032408105,0.0002781791,0.000058616264,0.3952396,0.00033690792,0.6012163,0.001967699,0.000053843763],"about_ca_topic_score_codex":0.004360906,"about_ca_topic_score_gemma":0.004199587,"teacher_disagreement_score":0.022255192,"about_ca_system_score_codex":0.002783493,"about_ca_system_score_gemma":0.0017339876,"threshold_uncertainty_score":0.07445103},"labels":[],"label_agreement":null},{"id":"W2270752796","doi":"10.1109/epec.2014.57","title":"UPS without Batteries","year":2014,"lang":"en","type":"article","venue":"Electrical Power and Energy Conference","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Backup; Reliability engineering; Tripping; Battery (electricity); Computer science; Electrical engineering; Power (physics); Automotive engineering; Electric power system; Engineering; Circuit breaker","score_opus":0.005475231900322881,"score_gpt":0.17873007762782198,"score_spread":0.1732548457274991,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2270752796","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01215717,0.01880462,0.057106983,0.0024374225,0.007032391,0.0005211876,0.0025513172,0.008012231,0.89137673],"genre_scores_gemma":[0.098252706,0.015751839,0.03745531,0.0030447538,0.0016763812,0.0003136996,0.003037677,0.0017588389,0.8387088],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99834025,0.00015914862,0.00012310337,0.00021182095,0.0009839647,0.00018170281],"domain_scores_gemma":[0.9985379,0.00017520286,0.000074836316,0.0005020625,0.0006260634,0.00008390586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006155232,0.0011838147,0.0008429367,0.001666741,0.001317747,0.0035352227,0.0016547762,0.0014264182,0.1261863],"category_scores_gemma":[0.0026712867,0.00061114045,0.0008796142,0.0017618296,0.00069108035,0.0056492914,0.002840448,0.0015811124,0.09631921],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030774839,0.00014903741,0.0004961957,0.0027125597,0.000040085302,0.000997354,0.00037601,0.0013435849,0.023525707,0.0846095,0.17309855,0.7123437],"study_design_scores_gemma":[0.000008996055,0.000084339394,0.0002727496,0.00014525103,0.000016048127,0.00046246054,0.00009742387,0.0002672263,0.005238581,0.005172202,0.98821825,0.000016565795],"about_ca_topic_score_codex":0.00089481636,"about_ca_topic_score_gemma":0.0010244683,"teacher_disagreement_score":0.1261863,"about_ca_system_score_codex":0.00080869644,"about_ca_system_score_gemma":0.000749259,"threshold_uncertainty_score":0.42213523},"labels":[],"label_agreement":null},{"id":"W2273653185","doi":"","title":"Making a case for dynamic electricity pricing","year":2006,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Idle; Dynamic pricing; Quarter (Canadian coin); Electricity pricing; Incentive; Air conditioning; Electricity demand; Electricity retailing; Economics; Electricity market; Electricity generation; Business; Environmental economics; Operations management; Microeconomics; Engineering; Electrical engineering; Power (physics); Mechanical engineering; Computer science; Geography; Physics","score_opus":0.028654782074364497,"score_gpt":0.30361718488250405,"score_spread":0.27496240280813955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2273653185","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011473157,0.0039261724,0.062049,0.5700216,0.0048136,0.00005468935,0.00018460279,0.00027908984,0.34719804],"genre_scores_gemma":[0.77736026,0.004350412,0.022325274,0.124076724,0.0080202855,0.00021747488,0.0002027928,0.00057407975,0.06287261],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9945539,0.0018872747,0.00010401822,0.00093707244,0.0016390516,0.00087860046],"domain_scores_gemma":[0.9899256,0.005615859,0.00047831426,0.0015054689,0.0013066586,0.0011680854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057689073,0.0005683234,0.00083922275,0.0006540493,0.00358971,0.01053096,0.0024638155,0.011630796,0.022785354],"category_scores_gemma":[0.030316189,0.00041734165,0.001013614,0.0008802892,0.0078877555,0.019499604,0.0041202805,0.020868963,0.0025723942],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002318726,0.000025851945,0.000232951,0.00001561961,0.0000081370645,0.000113605885,0.00013393769,0.001329487,0.000054987795,0.9489694,0.04048256,0.0086101685],"study_design_scores_gemma":[0.000022480988,0.0000059461186,0.000106918385,0.000039417188,0.0000047491662,0.00006345836,0.00016148627,0.0031452314,0.000063211446,0.9051463,0.0912271,0.000013826656],"about_ca_topic_score_codex":0.004604995,"about_ca_topic_score_gemma":0.0044596978,"teacher_disagreement_score":0.022785354,"about_ca_system_score_codex":0.0028454277,"about_ca_system_score_gemma":0.0030802258,"threshold_uncertainty_score":0.076224625},"labels":[],"label_agreement":null},{"id":"W2274590954","doi":"10.1016/j.suscom.2016.01.004","title":"A simple and robust approach to energy disaggregation in the presence of outliers","year":2016,"lang":"en","type":"article","venue":"Sustainable Computing Informatics and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada; Natural Science Foundation of Ningbo","keywords":"Computer science; Outlier; Overhead (engineering); Cluster analysis; Data mining; TRACE (psycholinguistics); Energy consumption; Energy (signal processing); Event (particle physics); Data cleansing; Anomaly detection; Hidden Markov model; Markov chain; Artificial intelligence; Machine learning; Engineering; Data quality; Mathematics","score_opus":0.008811287612282077,"score_gpt":0.18599460527200934,"score_spread":0.17718331765972725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2274590954","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059516225,0.000113725335,0.9924298,0.00009975356,0.00007135411,0.000036769412,0.00011514426,0.00058578845,0.0005960049],"genre_scores_gemma":[0.46578637,0.0002538696,0.5280394,0.0001512426,0.00036350463,0.00012669517,0.00077670545,0.00034809718,0.0041540703],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808735,0.00040977882,0.0001397321,0.0004792694,0.0007381515,0.00014574833],"domain_scores_gemma":[0.9976928,0.0008148885,0.00029575347,0.00057112833,0.0005421725,0.00008312313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017704472,0.0014399964,0.002222874,0.0011549267,0.0008063475,0.0017664656,0.0015581792,0.0013231579,0.001760687],"category_scores_gemma":[0.007941299,0.000628707,0.0012102633,0.001419049,0.00068294496,0.0016958913,0.0022215038,0.0021103444,0.0009373445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053682434,0.0001730432,0.0027160463,0.00020170615,0.00034902256,0.00040417208,0.00020105758,0.6275404,0.029691514,0.01773556,0.004912447,0.31553823],"study_design_scores_gemma":[0.000011484269,0.000041090367,0.000507103,0.0000059405193,0.000016411093,0.000065278036,0.000017827399,0.9877828,0.003120288,0.0068817423,0.0015291235,0.00002084902],"about_ca_topic_score_codex":0.0038883016,"about_ca_topic_score_gemma":0.0051343623,"teacher_disagreement_score":0.0038883016,"about_ca_system_score_codex":0.0004948815,"about_ca_system_score_gemma":0.0011567472,"threshold_uncertainty_score":0.009363174},"labels":[],"label_agreement":null},{"id":"W2278960053","doi":"","title":"Optimización del uso de la potencia reactiva en el sistema eléctrico ecuatoriano mediante la programación no lineal","year":2014,"lang":"es","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; AC power; Compiler; Electric power system; Scheduling (production processes); Electric power transmission; Voltage; Engineering; Power (physics); Electrical engineering; Mathematical optimization; Mathematics; Operating system; Physics","score_opus":0.003215737007178399,"score_gpt":0.24905857699344347,"score_spread":0.24584283998626508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2278960053","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31407374,0.003682086,0.6568231,0.0006808077,0.0002640478,0.00016032906,0.00025417784,0.002207616,0.021854116],"genre_scores_gemma":[0.96483153,0.00085841375,0.029443828,0.000063314175,0.00002973609,0.00006903109,0.00007462781,0.00012068802,0.004508735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998286,0.00004396802,0.0000043165055,0.000045202458,0.000052834377,0.000025097057],"domain_scores_gemma":[0.9997532,0.00013380815,0.000049888753,0.000014026029,0.000038432252,0.000010721524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006064507,0.0007862359,0.00046670792,0.00023879681,0.00020960653,0.0008513068,0.00044307738,0.0006095698,0.004327272],"category_scores_gemma":[0.0011168268,0.00025974898,0.00027731407,0.0003276493,0.00031469497,0.00065871247,0.00032747284,0.00065798534,0.0004297282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003790488,0.00009597822,0.00055476354,0.00019001677,0.000027209288,0.000037490456,0.000032421347,0.93183523,0.008321648,0.0015937,0.0007410234,0.056191478],"study_design_scores_gemma":[0.000050831994,0.00032517538,0.00054096367,0.000025063237,0.00005707057,0.00001603498,0.000026551219,0.9891778,0.006283073,0.0014215836,0.0020684265,0.0000073453475],"about_ca_topic_score_codex":0.003150873,"about_ca_topic_score_gemma":0.003436642,"teacher_disagreement_score":0.004327272,"about_ca_system_score_codex":0.0005680946,"about_ca_system_score_gemma":0.00050070585,"threshold_uncertainty_score":0.01447618},"labels":[],"label_agreement":null},{"id":"W2279524407","doi":"10.1049/iet-gtd.2015.0103","title":"Optimal scheduling of virtual power plant with battery degradation cost","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Fundamental Research Funds for the Central Universities","keywords":"Scheduling (production processes); Battery (electricity); Computer science; Degradation (telecommunications); Reliability engineering; Power (physics); Engineering; Telecommunications; Operations management","score_opus":0.021536492693763523,"score_gpt":0.21002927132770116,"score_spread":0.18849277863393765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279524407","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12860687,0.00048540864,0.85718685,0.0004546867,0.000111176545,0.00016557235,0.00029339877,0.00030265521,0.012393413],"genre_scores_gemma":[0.9789044,0.0001100196,0.018444983,0.00003260757,0.000016454136,0.00007776176,0.00007747633,0.00003665535,0.0022996124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940753,0.00022188092,0.000017914694,0.000110075176,0.000095546995,0.00014707858],"domain_scores_gemma":[0.9993814,0.00030467502,0.000112045855,0.000036461406,0.00008465831,0.00008074255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008516443,0.0009573509,0.001243053,0.0003631093,0.00043782912,0.0014288294,0.0010679242,0.0008693554,0.0032813079],"category_scores_gemma":[0.0014941805,0.0006081878,0.000609312,0.00047264912,0.0006011927,0.00083425007,0.0007026051,0.0010390497,0.00025245303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028800787,0.000009278491,0.0000769441,0.000014712949,0.0000058596165,0.000028343755,0.000008481422,0.9958097,0.00031292503,0.0016724364,0.0001684876,0.0018640801],"study_design_scores_gemma":[0.00000463694,0.000014775724,0.000039588034,0.0000011718174,0.0000022126258,0.0000042663023,0.0000049476757,0.9988908,0.00008291739,0.000856059,0.00009685496,0.0000017562535],"about_ca_topic_score_codex":0.008121804,"about_ca_topic_score_gemma":0.00596314,"teacher_disagreement_score":0.008121804,"about_ca_system_score_codex":0.0013106513,"about_ca_system_score_gemma":0.0016320173,"threshold_uncertainty_score":0.016149104},"labels":[],"label_agreement":null},{"id":"W2279959162","doi":"10.2172/814555","title":"Spinning Reserves from Controllable Packaged Through the Wall Air Conditioner (PTAC) Units","year":2003,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Petroleum Technology Alliance Canada; Oak Ridge National Laboratory; New York State Energy Research and Development Authority; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy; Department of Water Resources; California Energy Commission","keywords":"HVAC; Spinning; Environmental science; Air conditioning; Thermostat; Automotive engineering; Controller (irrigation); Computer science; Engineering; Electrical engineering; Mechanical engineering","score_opus":0.04461198930811242,"score_gpt":0.24658364611486155,"score_spread":0.20197165680674914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279959162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9398183,0.0010833805,0.04643808,0.00009422628,0.00017876878,0.00020768179,0.0004481187,0.0012627322,0.010468548],"genre_scores_gemma":[0.97456056,0.00036387658,0.01861029,0.00006419324,0.000040747087,0.00008238725,0.00053041213,0.00013364,0.005613861],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995346,0.000083732186,0.000025798914,0.00007485667,0.00022253179,0.000058407062],"domain_scores_gemma":[0.999647,0.00008103389,0.00007934674,0.00007508445,0.00007457699,0.00004285979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003349038,0.00041361587,0.00022551909,0.00045279687,0.0002837781,0.00056525954,0.0006477343,0.0001990901,0.00502297],"category_scores_gemma":[0.0006618952,0.00017545892,0.00033088564,0.00027289355,0.00022146771,0.0006478865,0.00038007036,0.00040637102,0.00080738775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021798569,0.0004377727,0.008117853,0.000588391,0.00008288369,0.00059273274,0.00025478777,0.0067070783,0.7535156,0.0011737754,0.00287459,0.22347462],"study_design_scores_gemma":[0.00028304328,0.0059668156,0.025292872,0.00008881973,0.00015837712,0.0008492071,0.00018667919,0.015514203,0.9128402,0.00041892324,0.03829319,0.00010769699],"about_ca_topic_score_codex":0.0005809737,"about_ca_topic_score_gemma":0.0008880448,"teacher_disagreement_score":0.00502297,"about_ca_system_score_codex":0.00015217734,"about_ca_system_score_gemma":0.00020538275,"threshold_uncertainty_score":0.016803503},"labels":[],"label_agreement":null},{"id":"W2281410527","doi":"10.1007/978-1-4614-0189-6_21","title":"Utility of Supercomputers in Trace-Back Algorithms for City-Sized Distribution Systems","year":2011,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"TRACE (psycholinguistics); Computer science; Algorithm; Philosophy","score_opus":0.04038286455032307,"score_gpt":0.21163206077547211,"score_spread":0.17124919622514906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281410527","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0190786,0.002882971,0.9241318,0.0013542213,0.0005677699,0.000088396715,0.00040894622,0.004458082,0.047029197],"genre_scores_gemma":[0.22432165,0.003459262,0.74923366,0.00033239886,0.00031159024,0.0001246579,0.00072754035,0.0012752424,0.020214014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995017,0.0001893061,0.000028578794,0.000075380885,0.00017486427,0.000030127303],"domain_scores_gemma":[0.99807215,0.001053454,0.000042042746,0.0004313964,0.00034400035,0.000057005254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001029013,0.0011132,0.0007193629,0.0007767425,0.00084058335,0.0017090295,0.0014435607,0.00082478934,0.007916432],"category_scores_gemma":[0.0047118887,0.0005584863,0.0004920777,0.0029058564,0.0007181019,0.002866037,0.000941534,0.0022974263,0.0023990762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024386027,0.00018697292,0.0014221151,0.00020749136,0.00010436038,0.00012527904,0.00021854012,0.4542182,0.0037639653,0.09161819,0.02976622,0.41812488],"study_design_scores_gemma":[0.000029423198,0.000028706,0.00021985643,0.0000398484,0.000023494442,0.000054677137,0.000048567355,0.9151566,0.003968966,0.05742892,0.022984948,0.000016060476],"about_ca_topic_score_codex":0.012698544,"about_ca_topic_score_gemma":0.0123069575,"teacher_disagreement_score":0.012698544,"about_ca_system_score_codex":0.0009738263,"about_ca_system_score_gemma":0.0011318949,"threshold_uncertainty_score":0.026483059},"labels":[],"label_agreement":null},{"id":"W2281918947","doi":"10.1109/ictck.2015.7582641","title":"Effects of bidding data disclosure on unilateral exercise of market power","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transparency (behavior); Bidding; Market power; Business; Publication; Microgrid; Open data; Industrial organization; Electricity market; Microeconomics; Electricity; Computer science; Economics; Marketing; Monopoly; Computer security; Advertising","score_opus":0.015491862478054558,"score_gpt":0.21088320712693537,"score_spread":0.1953913446488808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281918947","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94569033,0.00042592114,0.03952651,0.001275275,0.00006707304,0.00020331035,0.00043949598,0.00022334895,0.01214863],"genre_scores_gemma":[0.99807173,0.00003289348,0.0015285392,0.00008310507,0.000010252593,0.000023773337,0.00004198871,0.000014503426,0.00019318178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9679387,0.018135406,0.0021998056,0.0020585814,0.007375242,0.0022921944],"domain_scores_gemma":[0.5671654,0.32192647,0.07062957,0.030295916,0.008078791,0.0019039564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024827914,0.00051100896,0.0006022034,0.00090633385,0.0008570718,0.0025042326,0.001123361,0.0014806794,0.0024428428],"category_scores_gemma":[0.15718995,0.00039264528,0.0008263824,0.0011339551,0.0037877134,0.004616456,0.0019906757,0.0031747404,0.00022542817],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008795352,0.0027032455,0.26246497,0.0012223874,0.001189182,0.002069268,0.0035889708,0.3523343,0.050472986,0.15729094,0.003828307,0.15404007],"study_design_scores_gemma":[0.00059981144,0.00509293,0.30008397,0.00029824759,0.000940773,0.0028345424,0.0027442873,0.44122913,0.10473123,0.13477919,0.006081054,0.0005848622],"about_ca_topic_score_codex":0.001469398,"about_ca_topic_score_gemma":0.0007147374,"teacher_disagreement_score":0.024827914,"about_ca_system_score_codex":0.0016819335,"about_ca_system_score_gemma":0.0013774399,"threshold_uncertainty_score":0.13130414},"labels":[],"label_agreement":null},{"id":"W2282710367","doi":"","title":"Electrical thermal storage optimization for demand side management","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Thermal energy storage; Electricity; Cold storage; Environmental science; Electricity demand; Corporation; Peak demand; Business; Electricity generation; Environmental economics; Engineering; Power (physics); Electrical engineering; Finance; Economics","score_opus":0.007346477797026499,"score_gpt":0.1940419232022192,"score_spread":0.1866954454051927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2282710367","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3351439,0.005600793,0.5083824,0.0021375034,0.00032909148,0.0004659871,0.0024555258,0.0021077187,0.14337713],"genre_scores_gemma":[0.976703,0.00036138404,0.007954469,0.00007203719,0.000021561462,0.00005511155,0.00026844617,0.000055515357,0.014508506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985313,0.000029985264,0.0000047087833,0.000023167633,0.000040965144,0.000047864425],"domain_scores_gemma":[0.9998354,0.0000527321,0.000013271299,0.000009429105,0.00007525661,0.000013973987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029154596,0.00077155785,0.00081737415,0.0003138222,0.00043673557,0.001033914,0.00079706556,0.00059956673,0.012283608],"category_scores_gemma":[0.0004944267,0.00030166772,0.0003248159,0.0005945822,0.00022197125,0.0006173336,0.0003800294,0.0005250991,0.00069877924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015875924,0.0000547756,0.00035703767,0.00008298901,0.000030101064,0.0000533705,0.000021680486,0.9626501,0.0036283198,0.0027775473,0.004185962,0.025999371],"study_design_scores_gemma":[0.000013654534,0.000029431922,0.0002681171,0.000007096124,0.000010924753,0.0000100934,0.000018465267,0.9969007,0.0006054848,0.0008902848,0.0012405562,0.0000053177732],"about_ca_topic_score_codex":0.052813094,"about_ca_topic_score_gemma":0.08555103,"teacher_disagreement_score":0.052813094,"about_ca_system_score_codex":0.0017588892,"about_ca_system_score_gemma":0.0019813597,"threshold_uncertainty_score":0.105011344},"labels":[],"label_agreement":null},{"id":"W2285595479","doi":"10.1007/s00267-015-0637-3","title":"Barriers and Solutions to Smart Water Grid Development","year":2015,"lang":"en","type":"article","venue":"Environmental Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport; Government of Ontario; Victorian Water Trust","keywords":"Business; Smart grid; Sustainable development; Environmental economics; Government (linguistics); Computer security; Environmental planning; Computer science; Engineering; Environmental science; Economics; Political science","score_opus":0.008795802069511603,"score_gpt":0.15554512551051705,"score_spread":0.14674932344100544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2285595479","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09557806,0.015918385,0.043875527,0.44579384,0.0022209883,0.00020897649,0.00036122676,0.00032760628,0.39571542],"genre_scores_gemma":[0.8923753,0.012133345,0.012019689,0.017010445,0.0005332482,0.00030850043,0.0001943936,0.00014084947,0.065284245],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.996007,0.0012265822,0.00021481662,0.00026656,0.0012741655,0.0010109323],"domain_scores_gemma":[0.99359894,0.0026557099,0.00077773776,0.00040276055,0.001504458,0.0010603229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041820593,0.00044499355,0.00046307564,0.0012699377,0.002827344,0.00810362,0.0015024765,0.0040396256,0.017372115],"category_scores_gemma":[0.012812345,0.00035474193,0.00044298675,0.0016658598,0.005941125,0.0107749365,0.008025205,0.0063636885,0.0012992931],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025210742,0.00004620883,0.0007416753,0.00024468586,0.00000737165,0.00013625144,0.0014102907,0.0009210307,0.00036984606,0.96232486,0.015670354,0.01810209],"study_design_scores_gemma":[0.000023015467,0.00003692714,0.0013589233,0.0008736036,0.0000143021225,0.00013875592,0.009426197,0.0019070744,0.00061748654,0.6608968,0.324675,0.000032049615],"about_ca_topic_score_codex":0.011735085,"about_ca_topic_score_gemma":0.018650284,"teacher_disagreement_score":0.017372115,"about_ca_system_score_codex":0.0047490294,"about_ca_system_score_gemma":0.012143412,"threshold_uncertainty_score":0.058115482},"labels":[],"label_agreement":null},{"id":"W2290795669","doi":"10.1109/cdc.2015.7403142","title":"Optimal control of aggregated heterogeneous thermostatically controlled loads for regulation services","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Flexibility (engineering); Smart grid; Computer science; Population; Grid; Aggregate (composite); Control (management); Frequency regulation; Service (business); Distributed computing; Control engineering; Power (physics); Electric power system; Engineering; Artificial intelligence","score_opus":0.009857023869441471,"score_gpt":0.208357450096424,"score_spread":0.19850042622698252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290795669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15061729,0.0002526848,0.84053403,0.00024316042,0.000076462755,0.00004768617,0.000058122998,0.00021520682,0.007955375],"genre_scores_gemma":[0.9953269,0.00005851832,0.0035607936,0.000019756028,0.000008985884,0.00002030105,0.000013019985,0.000007786327,0.0009840202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976784,0.00006120141,0.000007993858,0.00005538307,0.000055111406,0.00005256401],"domain_scores_gemma":[0.9997564,0.00009941533,0.000060731916,0.000017457098,0.000044982295,0.000021048843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044662307,0.000542822,0.00056288025,0.00018858713,0.00033857944,0.00090459414,0.0006743306,0.0003775814,0.0010717798],"category_scores_gemma":[0.0007324025,0.00023209058,0.0004552389,0.00024347278,0.00066915463,0.000749163,0.0005535748,0.00056334207,0.00011455194],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035659203,0.000019825222,0.00023638345,0.000011361846,0.000012554308,0.000025251917,0.000019912099,0.9903769,0.0019541162,0.0037936827,0.000187872,0.0033264386],"study_design_scores_gemma":[0.0000032694168,0.000012578217,0.000052878204,6.0952755e-7,0.0000023201353,0.0000018146528,0.000003906443,0.9991493,0.00015778582,0.0005377126,0.00007654243,0.0000013276258],"about_ca_topic_score_codex":0.005971343,"about_ca_topic_score_gemma":0.0052306405,"teacher_disagreement_score":0.005971343,"about_ca_system_score_codex":0.000743507,"about_ca_system_score_gemma":0.00059879915,"threshold_uncertainty_score":0.011873186},"labels":[],"label_agreement":null},{"id":"W2290902163","doi":"","title":"Moving the Needle: Measuring the Performance of an Energy Program Promotional Campaign","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Outreach; Marketing; Incentive; Incentive program; Business; Program Design Language; Promotion (chess); Social marketing; Lift (data mining); Advertising; Public relations; Engineering; Computer science; Economics; Political science","score_opus":0.01974901421403256,"score_gpt":0.20021309786741354,"score_spread":0.18046408365338099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290902163","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9629604,0.00033994872,0.015557837,0.0005432505,0.00011145039,0.0035243698,0.001237287,0.00021533226,0.01551009],"genre_scores_gemma":[0.9572665,0.0003190191,0.031950995,0.00052359235,0.000090308604,0.0026767817,0.0010072679,0.0000585192,0.0061069336],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9831523,0.007311687,0.00077612617,0.0014804323,0.0061635613,0.0011159314],"domain_scores_gemma":[0.9562448,0.019522298,0.008849858,0.0030334422,0.009620614,0.0027289721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019719275,0.0006905076,0.00046914755,0.0016984758,0.0018546652,0.0020385087,0.0012259106,0.0012127294,0.0032543254],"category_scores_gemma":[0.039122798,0.0004674035,0.00066345104,0.0013880546,0.0013453542,0.0017664798,0.0011981255,0.0014858298,0.0013214735],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002011325,0.009895071,0.68926895,0.0010211852,0.00053066073,0.00017335886,0.008838983,0.0030961374,0.01610103,0.0015219534,0.0042944863,0.26324686],"study_design_scores_gemma":[0.000076993994,0.012874164,0.9643537,0.00017738054,0.0001971114,0.000052313517,0.002573647,0.004720664,0.007435005,0.0005617382,0.006886687,0.000090693065],"about_ca_topic_score_codex":0.034583982,"about_ca_topic_score_gemma":0.04836323,"teacher_disagreement_score":0.034583982,"about_ca_system_score_codex":0.0028950074,"about_ca_system_score_gemma":0.0035902865,"threshold_uncertainty_score":0.10428673},"labels":[],"label_agreement":null},{"id":"W2291032744","doi":"10.1109/globalsip.2015.7418373","title":"Power dispatch and load control with generation uncertainty","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"CVAR; Mathematical optimization; Computer science; Electric power system; Demand response; Voltage; Optimization problem; Scheduling (production processes); Relaxation (psychology); Expected shortfall; Control theory (sociology); Power (physics); Control (management); Risk management; Engineering; Electricity; Mathematics; Electrical engineering","score_opus":0.009002758969751404,"score_gpt":0.17827812131699372,"score_spread":0.16927536234724233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291032744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013525915,0.0005082975,0.97775453,0.00039264836,0.00010365428,0.00006308186,0.0001441905,0.00018366196,0.0073239324],"genre_scores_gemma":[0.93353903,0.0004169018,0.058626395,0.00011921096,0.00016146172,0.00012145582,0.00016086937,0.000108047396,0.0067466255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924624,0.00025207293,0.000037004414,0.00020276409,0.0001552455,0.000106681066],"domain_scores_gemma":[0.99923,0.00047121366,0.00011675899,0.00005518271,0.000079387806,0.000047498845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012313554,0.0012501779,0.00157417,0.00042368437,0.00052733964,0.0017680951,0.0011435612,0.0009898867,0.004059332],"category_scores_gemma":[0.0024619447,0.0005181022,0.00048532904,0.001047931,0.0007334041,0.0017278132,0.0010107456,0.001339699,0.0004802022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059401813,0.00002067162,0.00010427072,0.0000472962,0.000022839668,0.000043165197,0.000022960769,0.96195674,0.00042744045,0.019703101,0.00101439,0.016577743],"study_design_scores_gemma":[0.000009548536,0.000009747428,0.000030119978,0.0000024496792,0.0000025687111,0.0000056553836,0.0000049519012,0.98975545,0.00010818099,0.009598126,0.00046984304,0.000003291911],"about_ca_topic_score_codex":0.0034451804,"about_ca_topic_score_gemma":0.0027776542,"teacher_disagreement_score":0.004059332,"about_ca_system_score_codex":0.0012748095,"about_ca_system_score_gemma":0.0010220513,"threshold_uncertainty_score":0.013579845},"labels":[],"label_agreement":null},{"id":"W2291809240","doi":"","title":"Transportation and Storage under a Dynamic Price Cap Regulation Process","year":2010,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Stylized fact; Process (computing); Economics; Microeconomics; Dynamic pricing; Sequential game; Game theory; Computer science; Macroeconomics","score_opus":0.008189998404242053,"score_gpt":0.2511485506313771,"score_spread":0.24295855222713503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291809240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.754032,0.00042722703,0.20767409,0.004102698,0.00012641164,0.00014165117,0.0009194446,0.00023914044,0.032337256],"genre_scores_gemma":[0.99440056,0.00013460383,0.002029375,0.000066711684,0.000017600114,0.000031006508,0.0000515076,0.000009706072,0.0032588982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892634,0.00041270815,0.000029260378,0.00021496436,0.000096385505,0.00032034787],"domain_scores_gemma":[0.99650156,0.0019532864,0.0008979351,0.00021850674,0.0002518398,0.0001768484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001450356,0.00074820867,0.00085874385,0.00047007165,0.0006488499,0.0022531087,0.001238881,0.0024888015,0.005091077],"category_scores_gemma":[0.0060350867,0.000547716,0.0010140027,0.00067666906,0.0022355958,0.003356202,0.0012372396,0.001409959,0.00031120362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022971201,0.00008865787,0.0013325005,0.00004143953,0.000039807943,0.00042679004,0.000072752155,0.8666626,0.001974146,0.12554727,0.0009016764,0.0026825876],"study_design_scores_gemma":[0.00008358904,0.00008273804,0.00081588054,0.000008956073,0.000039173432,0.00006547166,0.00012120992,0.9478125,0.000521049,0.04982699,0.0005937271,0.000028714916],"about_ca_topic_score_codex":0.012773478,"about_ca_topic_score_gemma":0.0067347847,"teacher_disagreement_score":0.012773478,"about_ca_system_score_codex":0.0026712473,"about_ca_system_score_gemma":0.0013513486,"threshold_uncertainty_score":0.025398254},"labels":[],"label_agreement":null},{"id":"W2294730764","doi":"","title":"Exact and Heuristic Methods for Energy Pricing Problem","year":2016,"lang":"en","type":"preprint","venue":"LillOA (Université de Lille (University Of Lille))","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Heuristic; Energy (signal processing); Mathematical optimization; Mathematical economics; Computer science; Economics; Mathematics; Statistics","score_opus":0.00831889484613644,"score_gpt":0.2004432409893156,"score_spread":0.19212434614317916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294730764","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035278487,0.0017387964,0.9863014,0.00037882398,0.00012944164,0.000055514058,0.000091474234,0.00015467941,0.0076220906],"genre_scores_gemma":[0.29098618,0.004152754,0.6933344,0.00041873462,0.0004222958,0.000580111,0.00041842923,0.0003582092,0.0093287965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988802,0.0005416879,0.00004523484,0.00010925508,0.0003029332,0.000120720724],"domain_scores_gemma":[0.99685824,0.0024672132,0.00016567238,0.00017292234,0.00025646458,0.00007949176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018957043,0.0014839564,0.001459984,0.0012321942,0.00061769853,0.0019831038,0.0017424397,0.0016840718,0.0054662228],"category_scores_gemma":[0.007595781,0.0007489378,0.001091478,0.0020550585,0.0013556574,0.0018895441,0.0013746893,0.0024708267,0.0008654651],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038766786,0.00007481364,0.00022317789,0.00018210315,0.0000322913,0.00005069106,0.00005929692,0.866261,0.00022160313,0.08921393,0.0026237704,0.041018575],"study_design_scores_gemma":[0.0000109651955,0.000009480187,0.000030847026,0.000018139446,0.0000053896892,0.0000118486405,0.000014692293,0.94412357,0.00006642852,0.05459104,0.0011131554,0.000004378721],"about_ca_topic_score_codex":0.006039831,"about_ca_topic_score_gemma":0.004401872,"teacher_disagreement_score":0.006039831,"about_ca_system_score_codex":0.0014553498,"about_ca_system_score_gemma":0.0017433023,"threshold_uncertainty_score":0.018286347},"labels":[],"label_agreement":null},{"id":"W2294876144","doi":"10.5441/002/edbt.2015.34","title":"Benchmarking Smart Meter Data Analytics","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Smart meter; Smart grid; Benchmark (surveying); Benchmarking; SPARK (programming language); Big data; Analytics; Database; Server; Embedded system; Data analysis; Real-time computing; Data mining; Operating system; Engineering","score_opus":0.11636778911237473,"score_gpt":0.253496275490898,"score_spread":0.13712848637852326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294876144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82286996,0.0011664411,0.08776224,0.0015152966,0.0005554713,0.00085092423,0.016363412,0.035047617,0.033868633],"genre_scores_gemma":[0.8678466,0.00040669792,0.090820864,0.00021563862,0.00006337147,0.00030384643,0.03642192,0.0010110476,0.002910024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9942034,0.00149407,0.00060325715,0.0012304438,0.0018923234,0.0005764434],"domain_scores_gemma":[0.990987,0.0027556529,0.00035653808,0.0028421616,0.002537882,0.0005207142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00405911,0.0016141189,0.0007506125,0.0019200403,0.00076850236,0.001997419,0.0028273303,0.0009866478,0.002847018],"category_scores_gemma":[0.0129477335,0.00039376153,0.0006691668,0.0053307083,0.0009900135,0.002761399,0.0019219129,0.0012499505,0.0014808245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026273346,0.0022654028,0.038871102,0.0013573783,0.0004858027,0.00055724336,0.0006194401,0.5852732,0.01945587,0.027876114,0.081409544,0.23920159],"study_design_scores_gemma":[0.00027612678,0.00046684308,0.012339101,0.000053222975,0.000045550252,0.00013893255,0.00033345722,0.9303426,0.029105885,0.0076962635,0.01914949,0.000052430125],"about_ca_topic_score_codex":0.00855222,"about_ca_topic_score_gemma":0.0052512563,"teacher_disagreement_score":0.00855222,"about_ca_system_score_codex":0.001607573,"about_ca_system_score_gemma":0.0020622155,"threshold_uncertainty_score":0.021466851},"labels":[],"label_agreement":null},{"id":"W2298696558","doi":"10.3390/en9030202","title":"Realistic Scheduling Mechanism for Smart Homes","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Scheduling (production processes); Electricity; Particle swarm optimization; Heuristic; Power consumption; Reliability engineering; Mathematical optimization; Real-time computing; Power (physics); Operations research; Engineering; Artificial intelligence; Algorithm","score_opus":0.011368437378436277,"score_gpt":0.2047085946835614,"score_spread":0.1933401573051251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2298696558","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033148587,0.00012964093,0.96212256,0.0001930834,0.00011033017,0.00011332442,0.000065632325,0.00069656444,0.0034203266],"genre_scores_gemma":[0.7999849,0.00013196362,0.1966823,0.000114307,0.00008110821,0.00020510508,0.00017816864,0.00009407551,0.002528044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877614,0.00050274533,0.000073532974,0.00023169543,0.0002913885,0.00012443891],"domain_scores_gemma":[0.99875915,0.00042673678,0.00024053948,0.0003046291,0.0001680037,0.00010094821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016243762,0.0005070949,0.0006008052,0.0003164357,0.0005107231,0.00076727045,0.0014272314,0.00063509715,0.003149431],"category_scores_gemma":[0.0032678607,0.00035973475,0.00040381402,0.0004448826,0.00047906107,0.0012632591,0.00067094207,0.0006357597,0.0004601486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029839028,0.00019109913,0.0010049393,0.00015363375,0.000049982333,0.00016456484,0.00019949318,0.86343795,0.01013067,0.06310513,0.0037059842,0.057558198],"study_design_scores_gemma":[0.000026879017,0.00008574798,0.00023293163,0.000005050673,0.000007954687,0.00005066214,0.000026570959,0.9850831,0.001107708,0.009908587,0.0034526791,0.000012150427],"about_ca_topic_score_codex":0.0014706104,"about_ca_topic_score_gemma":0.0017898106,"teacher_disagreement_score":0.003149431,"about_ca_system_score_codex":0.000857289,"about_ca_system_score_gemma":0.0010492397,"threshold_uncertainty_score":0.010535836},"labels":[],"label_agreement":null},{"id":"W2302675721","doi":"10.1109/smartgridcomm.2015.7436325","title":"Distributed demand curtailment via water-filling","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scalability; Computer science; Smart grid; Flexibility (engineering); Demand response; Carbon footprint; Distributed computing; Grid; Peak demand; Aggregate (composite); Reduction (mathematics); Electricity; Engineering; Electrical engineering","score_opus":0.013680544632356809,"score_gpt":0.19133975005177178,"score_spread":0.177659205419415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2302675721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05763949,0.00017124892,0.93470496,0.000376542,0.000063632004,0.00009388447,0.000086622495,0.0009532225,0.0059103845],"genre_scores_gemma":[0.96080744,0.00008407671,0.03606502,0.000099888995,0.000020070436,0.000054922944,0.000037793732,0.00004303919,0.0027877814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964476,0.00009232654,0.000016355096,0.00010161471,0.00008038224,0.00006448014],"domain_scores_gemma":[0.9995585,0.00019349596,0.000076478085,0.00007036675,0.00006315617,0.000037918333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004583935,0.0005410678,0.00077942654,0.0002666525,0.00045858388,0.0006869272,0.0012594939,0.00063393754,0.0023608846],"category_scores_gemma":[0.0012058647,0.00027939255,0.00035375496,0.0004610144,0.00071353413,0.0010945294,0.0014150073,0.000596463,0.00041169912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003465883,0.00024928252,0.0008561645,0.00018738484,0.00005827087,0.00035531324,0.00028219726,0.75046897,0.0479534,0.033217683,0.005607463,0.16041723],"study_design_scores_gemma":[0.00002388311,0.000053477597,0.000078878526,0.000005212828,0.0000070552437,0.00003892664,0.000032141794,0.98692816,0.0032694754,0.0076446147,0.00190717,0.000010981909],"about_ca_topic_score_codex":0.0023745256,"about_ca_topic_score_gemma":0.0029854209,"teacher_disagreement_score":0.0023745256,"about_ca_system_score_codex":0.0005118616,"about_ca_system_score_gemma":0.00064337155,"threshold_uncertainty_score":0.007897913},"labels":[],"label_agreement":null},{"id":"W2302941507","doi":"10.1109/tcsii.2016.2603479","title":"Load Disaggregation Based on Aided Linear Integer Programming","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits & Systems II Express Briefs","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Integer programming; Branch and price; Linear programming; Integer (computer science); Computer science; Mathematical optimization; Mathematics; Algorithm; Programming language","score_opus":0.013888861259593443,"score_gpt":0.20912657189880932,"score_spread":0.19523771063921588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2302941507","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010560949,0.00005926111,0.9860162,0.00007223492,0.000021488797,0.000039194834,0.00007378603,0.000945161,0.0022117423],"genre_scores_gemma":[0.5947738,0.0001139703,0.40161484,0.00013204242,0.000055865454,0.00014875662,0.0003632819,0.00014702385,0.0026504057],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994609,0.00013774325,0.00004100214,0.0001105315,0.00017840948,0.00007153697],"domain_scores_gemma":[0.9994254,0.00024919462,0.0000767273,0.0001019212,0.00012704163,0.000019766449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053554797,0.0007562181,0.000888799,0.0004666354,0.0003852869,0.0010534553,0.00068897865,0.00036031893,0.0026972035],"category_scores_gemma":[0.0015366772,0.00038806663,0.00047137338,0.0009705769,0.0002704557,0.0010681796,0.00085659616,0.0010371034,0.00051571504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020932351,0.00009799462,0.0009424811,0.00009192031,0.00004248012,0.000106520674,0.000095134215,0.7673247,0.011906689,0.008288808,0.0026341993,0.20825991],"study_design_scores_gemma":[0.00000406999,0.0000133701815,0.00005944692,0.0000012310676,0.000002775786,0.000007436561,0.0000041534395,0.9972868,0.0009792129,0.0012062814,0.00043249258,0.0000027076708],"about_ca_topic_score_codex":0.0031394241,"about_ca_topic_score_gemma":0.0042033712,"teacher_disagreement_score":0.0031394241,"about_ca_system_score_codex":0.00045154666,"about_ca_system_score_gemma":0.0007912144,"threshold_uncertainty_score":0.009023011},"labels":[],"label_agreement":null},{"id":"W2308835159","doi":"10.1109/smartgridcomm.2015.7436301","title":"An autonomous demand response program in smart grid with foresighted users","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Demand response; Computer science; Inefficiency; Nash equilibrium; Smart grid; Partition (number theory); Grid; Subgame perfect equilibrium; Best response; Load management; On demand; Response time; Game theory; Microeconomics; Economics; Engineering; Electricity","score_opus":0.0138713102515114,"score_gpt":0.2273992619304073,"score_spread":0.2135279516788959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2308835159","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42314646,0.00007711371,0.56560045,0.0005912257,0.000053336666,0.00039801997,0.00011197445,0.0005646375,0.009456738],"genre_scores_gemma":[0.98258984,0.000017408398,0.01584632,0.000048676702,0.000007591651,0.000082961364,0.000021683827,0.000012111183,0.0013733981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833363,0.000729752,0.000043920536,0.00037142675,0.00022968228,0.00029155036],"domain_scores_gemma":[0.9985839,0.00062747125,0.00023823415,0.000120670185,0.00013805565,0.00029166683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016533108,0.000664414,0.0007107086,0.00028126154,0.00080181425,0.0009935494,0.001735402,0.0011618243,0.0021997592],"category_scores_gemma":[0.002352662,0.0003998476,0.0005152205,0.0003425027,0.0011068132,0.001769379,0.0014207326,0.000944949,0.0002585861],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018326703,0.0010617055,0.0062014586,0.00021851795,0.00013915938,0.0019763398,0.0011126334,0.8145106,0.025230337,0.09419602,0.0027611353,0.05075951],"study_design_scores_gemma":[0.00009145927,0.00022166994,0.00041322107,0.000004767762,0.000018216091,0.00013191628,0.00016421445,0.9802721,0.0015998373,0.016170755,0.00088773615,0.000024050883],"about_ca_topic_score_codex":0.0040941485,"about_ca_topic_score_gemma":0.0040782467,"teacher_disagreement_score":0.0040941485,"about_ca_system_score_codex":0.001075362,"about_ca_system_score_gemma":0.0015198294,"threshold_uncertainty_score":0.008743644},"labels":[],"label_agreement":null},{"id":"W2309617675","doi":"10.1109/smartgridcomm.2015.7436368","title":"Combining electric vehicle and rechargeable battery for household load hiding","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Battery (electricity); Flexibility (engineering); Electric vehicle; Electricity; Smart grid; Real-time computing; Automotive engineering; Electrical engineering; Engineering","score_opus":0.04408250857343531,"score_gpt":0.20718942261244463,"score_spread":0.16310691403900932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2309617675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17705868,0.000450436,0.8187037,0.00022959882,0.000040870167,0.0000644653,0.00005103498,0.00097352744,0.0024276744],"genre_scores_gemma":[0.9346428,0.00014774413,0.063467704,0.000049529637,0.000014581615,0.00002239064,0.00005584701,0.000019597603,0.0015797649],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995191,0.0001035856,0.000031008803,0.00008781853,0.00017179888,0.00008673938],"domain_scores_gemma":[0.99947125,0.00014621038,0.000093189556,0.00018925143,0.00007711538,0.00002302085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044661135,0.00046275533,0.00040359408,0.00031499693,0.0002492147,0.00047002936,0.00063655205,0.0004880034,0.0006126463],"category_scores_gemma":[0.0012522169,0.00018723583,0.00036603273,0.00048800852,0.00046482074,0.0015897606,0.0010671507,0.0004016885,0.00023126157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010802172,0.00021751174,0.008395561,0.00024370385,0.00018833115,0.00068082096,0.00033553873,0.29543808,0.11708779,0.025426531,0.0019191373,0.5489868],"study_design_scores_gemma":[0.000040756702,0.00019217076,0.0013667888,0.000016058328,0.000066778826,0.00054731936,0.00006620938,0.8590231,0.12678383,0.007568535,0.004287738,0.00004071917],"about_ca_topic_score_codex":0.00062868244,"about_ca_topic_score_gemma":0.00072050595,"teacher_disagreement_score":0.00063655205,"about_ca_system_score_codex":0.00031442955,"about_ca_system_score_gemma":0.0003242933,"threshold_uncertainty_score":0.0023619533},"labels":[],"label_agreement":null},{"id":"W2310724192","doi":"10.1109/smartgridcomm.2015.7436373","title":"Energy storage management in smart homes based on resident activity of daily life recognition","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Energy management; Energy storage; Computer science; Energy management system; Home automation; Piecewise; Battery (electricity); Energy (signal processing); Mathematical optimization; Reliability engineering; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.024352956784385565,"score_gpt":0.21100837676094022,"score_spread":0.18665541997655466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2310724192","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6648079,0.0009334779,0.32878935,0.00052250153,0.00007194129,0.00008218234,0.00057207054,0.00089200557,0.0033285578],"genre_scores_gemma":[0.994179,0.000094068986,0.0052046827,0.000020175597,0.0000075400835,0.000011065683,0.000113971415,0.000005102134,0.00036448846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983156,0.00003469338,0.00001425879,0.000057278867,0.00003051338,0.00003161454],"domain_scores_gemma":[0.999788,0.00007779482,0.000042679865,0.000025568497,0.000047021073,0.000018862973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033151117,0.00029458277,0.0005438951,0.0003000869,0.00020323931,0.00042667333,0.0005162014,0.0002589814,0.00064519036],"category_scores_gemma":[0.00073933054,0.00013660152,0.0002436158,0.00043255335,0.00021092487,0.00081969536,0.00048997457,0.00026053868,0.00012192634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049530895,0.00027872287,0.025699176,0.00016762933,0.000086213986,0.0003507951,0.00017059076,0.74837124,0.011968492,0.005308287,0.0037299772,0.20337352],"study_design_scores_gemma":[0.0000053831905,0.000023351065,0.0020914623,0.0000033782696,0.000008678055,0.000031543295,0.000033857283,0.9946827,0.0015818056,0.0012833568,0.0002490151,0.000005460834],"about_ca_topic_score_codex":0.0047845542,"about_ca_topic_score_gemma":0.0067741005,"teacher_disagreement_score":0.0047845542,"about_ca_system_score_codex":0.0004407052,"about_ca_system_score_gemma":0.00038001602,"threshold_uncertainty_score":0.009513438},"labels":[],"label_agreement":null},{"id":"W2312538844","doi":"","title":"Demand Response Implementation for Remote Communities Installation Challenges and Initial Results for the Village of Hartley Bay","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Thermostat; Bay; Peak demand; Service (business); Environmental science; Operations management; Environmental economics; Engineering; Economics; Electricity; Civil engineering; Electrical engineering; Economy","score_opus":0.0814053151306225,"score_gpt":0.2856827123619326,"score_spread":0.2042773972313101,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312538844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97594243,0.00007271952,0.0028497586,0.0008054154,0.000026604652,0.0016634293,0.00040918365,0.0006652756,0.01756512],"genre_scores_gemma":[0.9781576,0.00009064128,0.006909542,0.00015483673,0.000014866544,0.00041215832,0.00085555704,0.000080443155,0.013324385],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9976998,0.0007712651,0.00006535602,0.00020199806,0.0006281821,0.000633356],"domain_scores_gemma":[0.995362,0.00058122014,0.00011112167,0.00025951394,0.0023853625,0.0013009486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022186073,0.0006309397,0.00044154175,0.00041973192,0.0021010162,0.0010587525,0.0016647856,0.0010764503,0.010400257],"category_scores_gemma":[0.0030176712,0.0003311239,0.000396961,0.0006260754,0.00048437284,0.00075458176,0.0013697109,0.0009229027,0.0015863865],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009715647,0.043537598,0.10779746,0.0028636572,0.00020013904,0.0073651522,0.023078261,0.07612685,0.121206984,0.003770339,0.02673794,0.5775999],"study_design_scores_gemma":[0.0066363155,0.05675508,0.50276923,0.00047555423,0.00030030863,0.0010999945,0.088076524,0.14213261,0.07014581,0.0016459654,0.12941857,0.000544019],"about_ca_topic_score_codex":0.2023733,"about_ca_topic_score_gemma":0.2746703,"teacher_disagreement_score":0.2023733,"about_ca_system_score_codex":0.0041314326,"about_ca_system_score_gemma":0.003719936,"threshold_uncertainty_score":0.40239072},"labels":[],"label_agreement":null},{"id":"W2312898148","doi":"10.1364/acpc.2013.aw4h.3","title":"Risk Analysis of Integrated Fiber-Wireless Smart Grid Communications Infrastructures Powered by Positive Energy Buildings","year":2013,"lang":"en","type":"article","venue":"Asia Communications and Photonics Conference 2013","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Intermittency; Wireless; Computer science; Grid; Telecommunications; Fiber; Power grid; Power (physics); Electrical engineering; Engineering","score_opus":0.007165643206650832,"score_gpt":0.20830884515367282,"score_spread":0.20114320194702198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312898148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8553011,0.0007222362,0.13014309,0.0011297454,0.00003479445,0.00009172006,0.00030632043,0.00014241978,0.012128753],"genre_scores_gemma":[0.9966989,0.00012339954,0.0016322911,0.000016494338,0.000010438635,0.000014017359,0.000055208588,0.000009659731,0.001439484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991372,0.0003840387,0.000024474539,0.0000927218,0.00020031347,0.00016132167],"domain_scores_gemma":[0.994769,0.0031869719,0.0011240287,0.00026013266,0.00044480944,0.00021511751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022232684,0.0008065896,0.000553237,0.0008475234,0.00034756493,0.0013608756,0.0009300285,0.0010285185,0.0023286594],"category_scores_gemma":[0.0062181735,0.00039859704,0.00064268673,0.0005873266,0.0011772672,0.0016144902,0.0011560677,0.00092007295,0.00013718357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023840384,0.000052873464,0.007836632,0.00004504154,0.00007407492,0.00035368837,0.000079234684,0.928355,0.001611313,0.054610234,0.0006950209,0.006048636],"study_design_scores_gemma":[0.0000120414925,0.00007494706,0.0029765742,0.000011534483,0.000041692245,0.00014079188,0.0000750736,0.9759562,0.0005280926,0.01984946,0.0003150175,0.000018544983],"about_ca_topic_score_codex":0.0037423524,"about_ca_topic_score_gemma":0.0021937536,"teacher_disagreement_score":0.0037423524,"about_ca_system_score_codex":0.0015597645,"about_ca_system_score_gemma":0.0006849934,"threshold_uncertainty_score":0.01175791},"labels":[],"label_agreement":null},{"id":"W2313558877","doi":"10.1109/tia.2016.2535268","title":"Performance Evaluation of the ZIP Model-Phaselet Frame Approach for Identifying Appliances in Residential Loads","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada; New Brunswick Innovation Foundation","keywords":"Bar (unit); Frame (networking); Energy (signal processing); Power (physics); Polynomial; Value (mathematics); Algorithm; Computer science; Mathematics; Applied mathematics; Statistics; Mathematical analysis; Telecommunications","score_opus":0.06118744688760841,"score_gpt":0.29134060678845897,"score_spread":0.23015315990085056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313558877","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22583166,0.0006325224,0.7629128,0.00030786547,0.000115658164,0.0001255855,0.00022939245,0.003971765,0.0058727935],"genre_scores_gemma":[0.85389805,0.00022402495,0.14282371,0.00008865696,0.00003651273,0.00006827177,0.00046625486,0.00012337217,0.0022711772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877816,0.00045942515,0.000043410495,0.00022356263,0.0003787983,0.00011659315],"domain_scores_gemma":[0.9977627,0.0012245344,0.00012072949,0.00015571808,0.0006339479,0.00010231972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027213022,0.0008454021,0.00095574424,0.000977872,0.0005834453,0.0010156116,0.0011571076,0.0012153937,0.0023251392],"category_scores_gemma":[0.0055510015,0.00021538064,0.0004850171,0.00070305227,0.00038759972,0.0014008532,0.0009863047,0.00083089457,0.0009257399],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001776984,0.00030135133,0.010151761,0.00015435986,0.000162699,0.00014783554,0.00024254475,0.75919825,0.0069517577,0.005313681,0.0026048701,0.21299385],"study_design_scores_gemma":[0.000006548391,0.000036573456,0.00030645245,0.000002042124,0.000005349577,0.0000111599975,0.000019086907,0.9986111,0.0006701598,0.00019528875,0.00013249091,0.000003812557],"about_ca_topic_score_codex":0.030075053,"about_ca_topic_score_gemma":0.016696285,"teacher_disagreement_score":0.030075053,"about_ca_system_score_codex":0.0014801908,"about_ca_system_score_gemma":0.0010911911,"threshold_uncertainty_score":0.05979997},"labels":[],"label_agreement":null},{"id":"W2314126258","doi":"10.1109/tsg.2016.2530630","title":"An Analytical Method for Probabilistic Modeling of the Steady-State Behavior of Secondary Residential System","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Demand response; Smart grid; Monte Carlo method; Grid; Transformer; Computer science; Reliability engineering; Transformation (genetics); Covariance; Distributed generation; Mathematical optimization; Engineering; Control engineering; Electricity; Mathematics; Renewable energy","score_opus":0.02150362903357787,"score_gpt":0.2607816910166597,"score_spread":0.23927806198308185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314126258","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006920188,0.00005712793,0.9975127,0.000028338476,0.000014098008,0.000014161558,0.000027474924,0.0001503201,0.0015036988],"genre_scores_gemma":[0.4492057,0.0015697387,0.5334662,0.00016996385,0.00021153694,0.00050587894,0.00036113703,0.00035125003,0.014158664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997725,0.000062087696,0.000009474988,0.00003264181,0.00010452613,0.00001876071],"domain_scores_gemma":[0.99969256,0.0001326807,0.000039352668,0.000035315665,0.00009076679,0.000009343317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045045232,0.00076379615,0.0005204575,0.0007073036,0.0004680855,0.00055185135,0.0011279474,0.0006724951,0.0036522266],"category_scores_gemma":[0.0012462029,0.00037449185,0.000899386,0.0007570779,0.0005133873,0.00096216943,0.00039023688,0.0008574173,0.0009716844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001532348,0.000027883481,0.0002877786,0.00010352325,0.000020708678,0.00014354725,0.000082065315,0.8720394,0.0059971884,0.08721428,0.0019337969,0.032134514],"study_design_scores_gemma":[0.0000015072826,0.000006514017,0.000028424474,0.0000047657295,0.000003931871,0.000039982115,0.000004813636,0.99270904,0.00039427908,0.0049945773,0.0018083745,0.0000037835086],"about_ca_topic_score_codex":0.003086618,"about_ca_topic_score_gemma":0.0026547292,"teacher_disagreement_score":0.0036522266,"about_ca_system_score_codex":0.00060506485,"about_ca_system_score_gemma":0.00093408383,"threshold_uncertainty_score":0.012217879},"labels":[],"label_agreement":null},{"id":"W2314419339","doi":"10.1145/2897165","title":"Computational Methods for Residential Energy Cost Optimization in Smart Grids","year":2016,"lang":"en","type":"review","venue":"ACM Computing Surveys","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Energy consumption; Scheduling (production processes); Grid; Reliability engineering; Risk analysis (engineering); Mathematical optimization; Electrical engineering; Engineering; Business","score_opus":0.04990963036584008,"score_gpt":0.3581827172885167,"score_spread":0.30827308692267663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314419339","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004266053,0.14258902,0.80781406,0.004007597,0.0010022854,0.00013319602,0.00031944798,0.00032642757,0.03954195],"genre_scores_gemma":[0.23052631,0.27733183,0.46683574,0.0012014902,0.002693307,0.00090012007,0.0010970943,0.0005409818,0.018873041],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919385,0.00035406774,0.00005017988,0.00008503289,0.00027225527,0.000044649812],"domain_scores_gemma":[0.9980901,0.0013462141,0.00010418546,0.00013797054,0.00028845234,0.000033053613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015251697,0.0013516182,0.0014137573,0.0010981645,0.00037387578,0.0017709404,0.0015261722,0.0012177739,0.005205551],"category_scores_gemma":[0.00435812,0.00054931134,0.0011511528,0.002975351,0.0009012982,0.0019219338,0.001167995,0.0021152042,0.0012714935],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003516734,0.00011559278,0.0007638891,0.0019807173,0.0001439915,0.000077068464,0.000090566,0.3925574,0.00038614174,0.34664756,0.022819875,0.23438197],"study_design_scores_gemma":[0.000029614217,0.00003784824,0.00055651163,0.00070940953,0.000047635134,0.00009754493,0.00008995624,0.6600505,0.00046735513,0.2526068,0.085275404,0.00003141849],"about_ca_topic_score_codex":0.003948663,"about_ca_topic_score_gemma":0.0029846008,"teacher_disagreement_score":0.005205551,"about_ca_system_score_codex":0.0010029619,"about_ca_system_score_gemma":0.0015557441,"threshold_uncertainty_score":0.017414272},"labels":[],"label_agreement":null},{"id":"W2314484518","doi":"10.1007/s11235-016-0156-4","title":"ICT and renewable energy: a way forward to the next generation telecom base stations","year":2016,"lang":"en","type":"article","venue":"Telecommunication Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":86,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Information and Communications Technology; Computer science; Telecommunications; Efficient energy use; Environmental economics; Scope (computer science); Greenhouse gas; Business; Electrical engineering; Engineering; Economics; World Wide Web","score_opus":0.04285820960863718,"score_gpt":0.22756587370632989,"score_spread":0.1847076640976927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314484518","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015292205,0.097990744,0.0489392,0.50514096,0.016754504,0.000043139255,0.0005364814,0.0008310612,0.31447178],"genre_scores_gemma":[0.43432844,0.19088872,0.043893814,0.05735787,0.025754722,0.00008589906,0.0012363804,0.00034125953,0.24611294],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995315,0.00009835039,0.000016685852,0.00004126591,0.0002312565,0.00008090685],"domain_scores_gemma":[0.9986003,0.00034688532,0.00012212723,0.00009905993,0.00048555716,0.00034600712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091555924,0.00050316314,0.0003791723,0.000636294,0.00076892093,0.0048786667,0.0008218662,0.0036558062,0.024464805],"category_scores_gemma":[0.0019419038,0.0001524001,0.00038355734,0.001483214,0.0013755609,0.0073666447,0.0016469039,0.002670381,0.0044978526],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017342588,0.00014731832,0.002145278,0.0003250275,0.0000339824,0.0002527062,0.00020238737,0.0030747214,0.0036458194,0.35719913,0.24954504,0.38325503],"study_design_scores_gemma":[0.00001894504,0.000056254597,0.0012584736,0.00025031948,0.000020752876,0.00023072633,0.00058302516,0.003740061,0.0010516741,0.13089703,0.86186963,0.00002312313],"about_ca_topic_score_codex":0.003175012,"about_ca_topic_score_gemma":0.006210759,"teacher_disagreement_score":0.024464805,"about_ca_system_score_codex":0.0017790993,"about_ca_system_score_gemma":0.0030644408,"threshold_uncertainty_score":0.08184296},"labels":[],"label_agreement":null},{"id":"W2315740735","doi":"10.1109/tsg.2016.2526651","title":"Resilient Distributed Real-Time Demand Response via Population Games","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Demand response; Software deployment; Scalability; Dispatchable generation; Flexibility (engineering); Computer science; Resilience (materials science); Distributed computing; Population; Smart grid; Consumption (sociology); Blackout; Game theory; Grid; Electric power system; Distributed generation; Power (physics); Microeconomics; Electricity; Economics; Engineering; Electrical engineering; Renewable energy","score_opus":0.006442449378886083,"score_gpt":0.20197708372905998,"score_spread":0.1955346343501739,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315740735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15013802,0.00023003241,0.8307588,0.0014913316,0.00012198139,0.00016157812,0.00013918242,0.0002721094,0.016686942],"genre_scores_gemma":[0.97831064,0.00011885905,0.017738294,0.0001527727,0.000027799299,0.00015499954,0.000037373848,0.00002336455,0.0034358539],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991854,0.0004176992,0.000021495807,0.00012661131,0.000103365724,0.00014552596],"domain_scores_gemma":[0.9974125,0.0019042102,0.0002493149,0.00008024758,0.00015649489,0.00019722884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014124009,0.0008557343,0.00085748715,0.0004387675,0.0006137137,0.0012804772,0.0012230928,0.0011609033,0.0029864444],"category_scores_gemma":[0.0053620473,0.00041417594,0.0007014527,0.00031151652,0.0015267368,0.0012804455,0.001716367,0.0014364737,0.00024738378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059556023,0.00004086696,0.0005715151,0.000026760801,0.000035183053,0.00011903977,0.00009867736,0.945101,0.0009342433,0.049034134,0.000743712,0.0032352346],"study_design_scores_gemma":[0.00001529958,0.000015491136,0.000056393645,0.0000017082106,0.0000038921044,0.000008068018,0.000018421406,0.9900114,0.000050142673,0.009621716,0.00019346246,0.0000039956813],"about_ca_topic_score_codex":0.0056389803,"about_ca_topic_score_gemma":0.0038994148,"teacher_disagreement_score":0.0056389803,"about_ca_system_score_codex":0.0013849246,"about_ca_system_score_gemma":0.0010350617,"threshold_uncertainty_score":0.011212349},"labels":[],"label_agreement":null},{"id":"W2320639967","doi":"10.1109/tste.2016.2543024","title":"Optimal Control of Energy Storage in a Microgrid by Minimizing Conditional Value-at-Risk","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"CVAR; Microgrid; Mathematical optimization; Expected shortfall; Stochastic optimization; Stochastic control; Computer science; Electricity; Demand response; Electricity pricing; Energy storage; Optimal control; Optimization problem; Electricity market; Control (management); Engineering; Power (physics); Economics; Mathematics; Risk management","score_opus":0.003154841162092742,"score_gpt":0.1756939718664597,"score_spread":0.17253913070436697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320639967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030433685,0.00041834186,0.96498144,0.00022092475,0.00005140876,0.00004569491,0.000049577477,0.0003559891,0.0034429687],"genre_scores_gemma":[0.9556522,0.00022805165,0.042325146,0.00005130592,0.00003680444,0.00007360183,0.000051851075,0.000052771484,0.0015282268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949586,0.00017113442,0.000025679601,0.00012365499,0.00011534709,0.00006827203],"domain_scores_gemma":[0.9993339,0.0004081746,0.00009658423,0.000038615293,0.00008963925,0.000033074357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011059301,0.0012029856,0.0012618557,0.00032864913,0.00039461118,0.0013425121,0.00082383107,0.00058227725,0.0015089773],"category_scores_gemma":[0.0019011047,0.0005790954,0.0006142096,0.00039223372,0.0007775731,0.0009162665,0.0009381513,0.00093167945,0.00013927066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053571443,0.000018550169,0.000104593135,0.000033090197,0.00002049826,0.00002382609,0.00002894075,0.9834561,0.00092728296,0.0038948995,0.00027538673,0.011163242],"study_design_scores_gemma":[0.00000430515,0.000013623018,0.000029341429,0.0000018236698,0.0000032315934,0.0000028695608,0.0000028173774,0.998722,0.00017790783,0.00095741556,0.00008200936,0.0000025593572],"about_ca_topic_score_codex":0.0059244577,"about_ca_topic_score_gemma":0.0040650824,"teacher_disagreement_score":0.0059244577,"about_ca_system_score_codex":0.00073303306,"about_ca_system_score_gemma":0.0012909656,"threshold_uncertainty_score":0.011779964},"labels":[],"label_agreement":null},{"id":"W2320825822","doi":"10.2316/journal.203.2012.2.203-4909","title":"POWER FLOW ANALYSIS OF A POWER SYSTEM USING SIMPLIFIED NEWTON–RAPHSON METHOD","year":2012,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Power flow; Newton's method; Electric power system; Power (physics); Flow (mathematics); Control theory (sociology); Power-flow study; Mathematics; Computer science; Applied mathematics; Mathematical optimization; Mechanics; Physics; Nonlinear system; Thermodynamics; Artificial intelligence","score_opus":0.010832926168625072,"score_gpt":0.253847219146736,"score_spread":0.24301429297811095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320825822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015569915,0.0004005156,0.96965057,0.00016672925,0.00008498271,0.00007984978,0.00012469973,0.00025936766,0.013663312],"genre_scores_gemma":[0.78130984,0.0014454817,0.1946019,0.00011004297,0.00016724115,0.00034777288,0.00035262867,0.00027101347,0.021393983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985313,0.00006005371,0.000006328015,0.000017167209,0.00004901642,0.000014279141],"domain_scores_gemma":[0.99982065,0.000076798366,0.000021154505,0.00001756974,0.000056492438,0.000007367684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028820417,0.00064357615,0.0009151581,0.0004937429,0.00047616198,0.00075149577,0.0007132918,0.0005901021,0.004653018],"category_scores_gemma":[0.0006933365,0.00033691924,0.00068487396,0.00054604193,0.0004705184,0.0009049476,0.0003691308,0.00073690136,0.00062264845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018048886,0.000017331773,0.00015330261,0.0000689525,0.000015338735,0.000084024934,0.000048290818,0.9717559,0.0020185735,0.011486929,0.0009500076,0.013383183],"study_design_scores_gemma":[0.0000021873836,0.000004471051,0.00006016838,0.0000020999626,0.000002127356,0.0000072007624,0.000003822364,0.9980319,0.00014581502,0.0012839569,0.00045387622,0.000002356442],"about_ca_topic_score_codex":0.009557355,"about_ca_topic_score_gemma":0.004988313,"teacher_disagreement_score":0.009557355,"about_ca_system_score_codex":0.00042794136,"about_ca_system_score_gemma":0.0007910667,"threshold_uncertainty_score":0.01900345},"labels":[],"label_agreement":null},{"id":"W2321179969","doi":"10.1049/iet-gtd.2015.0098","title":"Performance optimisation for novel green plug‐energy economizer in micro‐grids based on recent heuristic algorithm","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Economizer; Heuristic; Computer science; Algorithm; Plug-in; Meta heuristic; Mathematical optimization; Engineering; Artificial intelligence; Mathematics; Mechanical engineering","score_opus":0.029467186438751982,"score_gpt":0.218734363238309,"score_spread":0.189267176799557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321179969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07706112,0.0009368113,0.90315056,0.0002802675,0.00009049134,0.00008633535,0.000042169842,0.00049161934,0.017860513],"genre_scores_gemma":[0.9191876,0.0003240289,0.07667548,0.00006938483,0.000027951035,0.000105545674,0.00004742142,0.00003655766,0.0035260108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998617,0.000034516906,0.0000054006196,0.000023236691,0.00004761244,0.000027628645],"domain_scores_gemma":[0.99983776,0.00007428398,0.000027392387,0.0000094014185,0.000041046635,0.000010079576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033884344,0.00052377395,0.00052485266,0.00038218076,0.00029629053,0.00076450943,0.00049626105,0.0005288404,0.0016586747],"category_scores_gemma":[0.00045954218,0.00021091945,0.00031726278,0.00028686775,0.00032490696,0.0003773628,0.0002767578,0.0003209209,0.00018897827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006607246,0.0000316614,0.00047698556,0.00006762489,0.000028308865,0.000039535214,0.000027820795,0.9591465,0.0020005,0.0046430076,0.0007570544,0.032714866],"study_design_scores_gemma":[0.000010611987,0.00003054246,0.00008646491,0.000003312886,0.00000399767,0.000008528354,0.000005737144,0.99877363,0.00033849606,0.00042391272,0.00031279985,0.0000019404872],"about_ca_topic_score_codex":0.0035079196,"about_ca_topic_score_gemma":0.0028584593,"teacher_disagreement_score":0.0035079196,"about_ca_system_score_codex":0.00050659804,"about_ca_system_score_gemma":0.0006948913,"threshold_uncertainty_score":0.006974995},"labels":[],"label_agreement":null},{"id":"W2322852481","doi":"10.1109/tsg.2016.2535198","title":"Discrete-Event Systems-Based Power Admission Control of Thermal Appliances in Smart Buildings","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"Mitacs; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); MATLAB; Computer science; Reduction (mathematics); Context (archaeology); Real-time computing; Control (management); Discrete event simulation; Event (particle physics); Embedded system; Control engineering; Reliability engineering; Automotive engineering; Simulation; Engineering; Operating system","score_opus":0.007209732936453751,"score_gpt":0.21096157276171776,"score_spread":0.20375183982526401,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322852481","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10437163,0.00045061944,0.8880276,0.00026389913,0.00011469199,0.00008926482,0.000042920088,0.0008929296,0.005746466],"genre_scores_gemma":[0.993171,0.000067212066,0.0061583864,0.000014334696,0.000015294987,0.000017055276,0.000010718125,0.000009677019,0.00053635746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993592,0.00022712129,0.00003510503,0.00010926474,0.00017756676,0.00009178525],"domain_scores_gemma":[0.9992623,0.00044179708,0.000095683376,0.000046754678,0.00009110001,0.00006238093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008605574,0.00039986378,0.00062356004,0.0002552986,0.00041023368,0.0013393027,0.0007077613,0.00035593758,0.0012855129],"category_scores_gemma":[0.0017887334,0.00019056661,0.00025098328,0.00027097913,0.00066079816,0.00066602026,0.0007157943,0.000910112,0.00012775612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023156308,0.00009011519,0.0005189402,0.00007896327,0.000024549528,0.00007820865,0.00010938235,0.9539017,0.005520977,0.0108328,0.00048933696,0.028123485],"study_design_scores_gemma":[0.0000074719383,0.000015084189,0.000097199096,0.0000020781497,0.000003170792,0.0000048609513,0.000009196944,0.99694484,0.0008894501,0.0018367413,0.00018655883,0.0000033020171],"about_ca_topic_score_codex":0.003800053,"about_ca_topic_score_gemma":0.0031821418,"teacher_disagreement_score":0.003800053,"about_ca_system_score_codex":0.00075971114,"about_ca_system_score_gemma":0.0007379424,"threshold_uncertainty_score":0.007555902},"labels":[],"label_agreement":null},{"id":"W2323851428","doi":"10.1061/40927(243)534","title":"Water Demand and Supply Management from Utilities' Perspective","year":2007,"lang":"en","type":"article","venue":"World Environmental and Water Resources Congress 2007","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Suncor Energy (Canada)","funders":"","keywords":"Computer science; Demand management; Demand forecasting; Supply and demand; Perspective (graphical); Operator (biology); Demand patterns; Load management; Risk analysis (engineering); Water supply; Environmental economics; Operations research; Business; Engineering; Economics; Environmental engineering; Microeconomics","score_opus":0.0034348690062000844,"score_gpt":0.16339197646197132,"score_spread":0.15995710745577124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323851428","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030217526,0.2633086,0.122195415,0.124501765,0.0038540526,0.00005505546,0.00070972554,0.00035788585,0.4548],"genre_scores_gemma":[0.59063035,0.31133223,0.017899597,0.010266043,0.0059871622,0.00006419649,0.00041911725,0.00009864422,0.0633027],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99950707,0.00014774883,0.000032414257,0.000039049493,0.00022327177,0.00005039577],"domain_scores_gemma":[0.9996667,0.0001255387,0.00003094136,0.000008647511,0.00014198996,0.000026165548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041582287,0.00041946615,0.0003607489,0.001486248,0.00036315742,0.0024607854,0.0004630211,0.0011548811,0.0031001759],"category_scores_gemma":[0.0006626507,0.00016931014,0.00018600766,0.0020846098,0.00086012384,0.0031253267,0.000672078,0.00093924877,0.00058087095],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043344604,0.0000906837,0.0023498763,0.001607194,0.000054366836,0.0005025064,0.0012122081,0.022867823,0.0018074529,0.56378806,0.08189306,0.32378337],"study_design_scores_gemma":[0.000007292771,0.000055514276,0.0017567778,0.00037869002,0.000021239788,0.00028047553,0.0016766714,0.007808636,0.0008683894,0.09428509,0.8928312,0.000030047773],"about_ca_topic_score_codex":0.0051108673,"about_ca_topic_score_gemma":0.007876069,"teacher_disagreement_score":0.0051108673,"about_ca_system_score_codex":0.0020950164,"about_ca_system_score_gemma":0.0011488632,"threshold_uncertainty_score":0.015200436},"labels":[],"label_agreement":null},{"id":"W2326493911","doi":"10.14288/1.0108295","title":"Electrical Energy Conservation Opportunities for plug loads and lighting in UBC Office Buildings","year":2011,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"BC Hydro","keywords":"Energy conservation; Architectural engineering; Electric light; Spark plug; Plug and play; Engineering; Civil engineering; Environmental science; Computer science; Electrical engineering; Mechanical engineering","score_opus":0.020800426512762406,"score_gpt":0.1551351329222422,"score_spread":0.1343347064094798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326493911","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72568834,0.0008282914,0.01271118,0.001053502,0.000051132705,0.00009615364,0.00049259595,0.00072137255,0.25835744],"genre_scores_gemma":[0.9732267,0.00025089923,0.0017212604,0.00003595016,0.000009130815,0.000013163653,0.00015276406,0.000061334285,0.024528662],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99973303,0.00007702054,0.0000053178896,0.000025110507,0.00009716847,0.000062336374],"domain_scores_gemma":[0.99974304,0.000072632676,0.000017225568,0.00003262765,0.00009207226,0.000042318734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027504718,0.00015208624,0.00013961957,0.0005390558,0.0008804645,0.0016252502,0.00032016088,0.00024676116,0.013581633],"category_scores_gemma":[0.0006194707,0.000088077795,0.000121701116,0.0010311056,0.000255892,0.0008377934,0.0004930158,0.00022512102,0.0009957701],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015349013,0.001339711,0.04869006,0.000385444,0.00003594263,0.00068479864,0.003369389,0.025527203,0.013428477,0.029901264,0.040993616,0.8341093],"study_design_scores_gemma":[0.00020830905,0.0010518307,0.35721725,0.00049197103,0.0002080083,0.00087234844,0.02641427,0.14712234,0.04248344,0.029610416,0.39414123,0.00017859401],"about_ca_topic_score_codex":0.02703876,"about_ca_topic_score_gemma":0.0954739,"teacher_disagreement_score":0.02703876,"about_ca_system_score_codex":0.0015741684,"about_ca_system_score_gemma":0.00073051243,"threshold_uncertainty_score":0.053762734},"labels":[],"label_agreement":null},{"id":"W2328442432","doi":"10.1504/ijpse.2015.075127","title":"CHP within smart micro energy grid: optimum operation with distributed energy resources","year":2015,"lang":"en","type":"article","venue":"International Journal of Process Systems Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Oak Ridge National Laboratory","keywords":"Distributed generation; Smart grid; Grid; Engineering; Investment (military); Cogeneration; Environmental economics; Energy storage; Automotive engineering; Power (physics); Reliability engineering; Renewable energy; Electrical engineering; Electricity generation; Economics","score_opus":0.007629374775117701,"score_gpt":0.19543659336529987,"score_spread":0.18780721859018215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328442432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16975422,0.0014023628,0.8079144,0.00034627263,0.00003876278,0.000084552485,0.00008719829,0.000448184,0.019924026],"genre_scores_gemma":[0.959386,0.0003418964,0.038024902,0.000011619473,0.000014275209,0.000031738364,0.00002283233,0.00002839912,0.0021382908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987435,0.00004007142,0.0000034290642,0.000026372998,0.000039858893,0.000015893651],"domain_scores_gemma":[0.9999275,0.000044548993,0.000009507723,0.000005798717,0.000008652003,0.0000039025313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018142225,0.00032145987,0.00032802369,0.00016309759,0.00016756676,0.000495891,0.00027851303,0.0003139892,0.0010674685],"category_scores_gemma":[0.00043582785,0.00016271157,0.00013394482,0.00040025223,0.00030989322,0.00064080505,0.0003373533,0.0002599913,0.00016566303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020053357,0.00002646249,0.00074121467,0.00009212592,0.0000144580645,0.000072167226,0.000035834393,0.91011745,0.008354475,0.010402235,0.0005918847,0.0693512],"study_design_scores_gemma":[0.0000144433225,0.000059279268,0.00034571785,0.0000050227513,0.0000049417367,0.000023968352,0.000015773161,0.9909723,0.003139621,0.0044343066,0.0009799366,0.0000047533276],"about_ca_topic_score_codex":0.0011871962,"about_ca_topic_score_gemma":0.0022005779,"teacher_disagreement_score":0.0011871962,"about_ca_system_score_codex":0.0003767774,"about_ca_system_score_gemma":0.00028435062,"threshold_uncertainty_score":0.0035710335},"labels":[],"label_agreement":null},{"id":"W2328706904","doi":"10.3384/ecp110571837","title":"Analysing the Energy Performance of Secondary Schools in N. Greece","year":2011,"lang":"en","type":"article","venue":"Linköping electronic conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Base load power plant; Renewable energy; Automotive engineering; Photovoltaic system; Environmental science; Voltage droop; Wind power; Electricity; Computer science; Electrical engineering; Engineering; Distributed generation; Voltage","score_opus":0.01229811454804204,"score_gpt":0.1773589357970495,"score_spread":0.16506082124900748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328706904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.992931,0.000030647327,0.00028071034,0.000027218604,0.0000056493777,0.000013457671,0.0010240738,0.00003972172,0.005647483],"genre_scores_gemma":[0.9970139,0.000019641016,0.00012835773,0.000007833665,0.0000018341001,0.000005509691,0.0008393801,0.000011594423,0.0019720548],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998348,0.000019475323,0.000010712608,0.000054974098,0.00003676285,0.000043363845],"domain_scores_gemma":[0.99986553,0.000024114224,0.000019625846,0.000013543066,0.00003733061,0.000039804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013536387,0.00021052605,0.00034148656,0.000667882,0.00031406136,0.00047296102,0.00035527092,0.0004466099,0.0027398253],"category_scores_gemma":[0.00032422898,0.00009429936,0.0003344166,0.0008368121,0.00022520796,0.00019709536,0.0004836042,0.00017651037,0.0012541871],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011758755,0.00048173557,0.78766376,0.00031405987,0.00030254936,0.0030212565,0.0024576117,0.10471371,0.026271995,0.0027124863,0.0065187146,0.06436614],"study_design_scores_gemma":[0.00001880342,0.00016587797,0.9699451,0.000019267805,0.000026659523,0.00021034633,0.0019758693,0.020790368,0.0028235498,0.00037983697,0.0036283862,0.000016002909],"about_ca_topic_score_codex":0.052982647,"about_ca_topic_score_gemma":0.08111977,"teacher_disagreement_score":0.052982647,"about_ca_system_score_codex":0.0010212424,"about_ca_system_score_gemma":0.00044898083,"threshold_uncertainty_score":0.10534853},"labels":[],"label_agreement":null},{"id":"W2330456757","doi":"10.1109/tpwrs.2014.2327041","title":"Home Appliance Load Modeling From Aggregated Smart Meter Data","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":149,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Smart grid; Metering mode; Home automation; Real-time computing; Hidden Markov model; Computer science; Demand response; Duration (music); Automatic meter reading; Data modeling; Electric power system; Markov chain; Load management; Power (physics); Engineering; Electricity; Telecommunications; Electrical engineering; Database; Wireless; Artificial intelligence","score_opus":0.024750371377631784,"score_gpt":0.2106625876590565,"score_spread":0.1859122162814247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330456757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48595333,0.00011038896,0.51006824,0.00019179331,0.000029956545,0.00004743814,0.0005860715,0.0010326551,0.001980142],"genre_scores_gemma":[0.97704834,0.000056078698,0.021086948,0.00002651194,0.0000122309175,0.000028237642,0.0006474776,0.000026074886,0.00106817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998337,0.000044909088,0.00001008215,0.000052026535,0.00003669864,0.00002249384],"domain_scores_gemma":[0.9996213,0.00020248129,0.000049216564,0.00006707261,0.00004841076,0.00001149659],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045426507,0.00051510485,0.0003704657,0.00037906482,0.00013070834,0.0004188396,0.00073298556,0.00037008573,0.00067170116],"category_scores_gemma":[0.0014115067,0.00031734144,0.00035189037,0.0005056151,0.00021376646,0.0007880913,0.00038023308,0.00054298685,0.00020381216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009093009,0.000060330716,0.009612672,0.00002959007,0.000027641096,0.000101116864,0.00006303567,0.94661343,0.0029454664,0.002043979,0.00061860564,0.037793137],"study_design_scores_gemma":[0.0000015766317,0.0000040031596,0.00058886793,5.629443e-7,0.0000013513841,0.0000054661996,0.0000039084057,0.99845076,0.00029438426,0.00059150736,0.000056191933,0.0000014281575],"about_ca_topic_score_codex":0.005152193,"about_ca_topic_score_gemma":0.007763985,"teacher_disagreement_score":0.005152193,"about_ca_system_score_codex":0.00039495234,"about_ca_system_score_gemma":0.00034002663,"threshold_uncertainty_score":0.010244429},"labels":[],"label_agreement":null},{"id":"W2334743621","doi":"10.1109/intlec.2014.6972115","title":"Dual-purposing telecom backup systems for cloud energy storage and grid ancillary services","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alpha Technologies (Canada)","funders":"","keywords":"Backup; Telecommunications; Computer science; Telecom infrastructure sharing; Grid; Peak demand; Electric power system; Electricity; Electrical engineering; Power (physics); Engineering; Operating system","score_opus":0.005278885505813258,"score_gpt":0.17259850391364512,"score_spread":0.16731961840783185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334743621","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49153298,0.0017108647,0.19779709,0.0034185473,0.0007048556,0.0007243932,0.0015936072,0.002993099,0.29952452],"genre_scores_gemma":[0.96079963,0.00023307794,0.01908751,0.00024864692,0.000053238804,0.000046442176,0.00026678338,0.00006461412,0.019200053],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996718,0.00004405761,0.00001555456,0.00006771629,0.000109397995,0.00009142419],"domain_scores_gemma":[0.99961334,0.00004620179,0.00003129221,0.0001077283,0.0001493238,0.000052139083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023851487,0.00038284005,0.00026151826,0.0006220562,0.0010112296,0.0012896698,0.00081424986,0.0006134809,0.016691236],"category_scores_gemma":[0.0005391455,0.00014204653,0.00033506795,0.00081685674,0.00037714772,0.0012889465,0.0009719896,0.00048115966,0.0023938583],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023388704,0.000893613,0.01450013,0.00066014356,0.0001139464,0.0026346855,0.00063182117,0.037310794,0.13885978,0.09658294,0.04044348,0.66502976],"study_design_scores_gemma":[0.00061744975,0.001579535,0.027545497,0.00037464217,0.0001930585,0.007855351,0.0013657826,0.36689273,0.21630059,0.053250797,0.3238639,0.0001606947],"about_ca_topic_score_codex":0.0038523101,"about_ca_topic_score_gemma":0.008557279,"teacher_disagreement_score":0.016691236,"about_ca_system_score_codex":0.0009289923,"about_ca_system_score_gemma":0.0010099997,"threshold_uncertainty_score":0.05583775},"labels":[],"label_agreement":null},{"id":"W2338863226","doi":"10.1109/tsg.2015.2472523","title":"Residential Demand Side Management Under High Penetration of Rooftop Photovoltaic Units","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Photovoltaic system; Mathematical optimization; Voltage; Computer science; Automotive engineering; Scheduling (production processes); Peaking power plant; Energy consumption; Electrical engineering; Distributed generation; Engineering; Renewable energy; Mathematics","score_opus":0.02243186696379463,"score_gpt":0.21351094882644012,"score_spread":0.1910790818626455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2338863226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7042137,0.00028155648,0.28795245,0.0005206099,0.00004075127,0.000051001116,0.00017149483,0.00042280386,0.006345742],"genre_scores_gemma":[0.9969764,0.000027537517,0.002613812,0.000017621422,0.0000052527453,0.0000042248116,0.000018198012,0.000008283928,0.0003287856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966824,0.00009500912,0.000010471651,0.00007033657,0.000057421053,0.00009851781],"domain_scores_gemma":[0.99930596,0.00034630613,0.00013764901,0.000033301436,0.00010412046,0.000072773255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050421746,0.00043034003,0.00054161344,0.00013224334,0.00027568438,0.0006536763,0.0006265153,0.00047986067,0.00097594265],"category_scores_gemma":[0.0010780878,0.00026156937,0.0002262054,0.0003208172,0.00027847957,0.00063139416,0.00045421068,0.0004948204,0.00013376267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000120088174,0.000061304454,0.0016178066,0.000027152913,0.000017113078,0.00024912387,0.000030217201,0.9830015,0.003729942,0.0016021052,0.0005361861,0.009007517],"study_design_scores_gemma":[0.000005742572,0.000025204623,0.00050226395,8.442792e-7,0.000003559355,0.000022206163,0.000019704365,0.9981047,0.0005436188,0.0006834066,0.00008604445,0.00000274833],"about_ca_topic_score_codex":0.0039214375,"about_ca_topic_score_gemma":0.0043887845,"teacher_disagreement_score":0.0039214375,"about_ca_system_score_codex":0.00068880036,"about_ca_system_score_gemma":0.00037974407,"threshold_uncertainty_score":0.007797241},"labels":[],"label_agreement":null},{"id":"W2340152469","doi":"10.1109/tpwrs.2015.2457428","title":"Model Predictive Control of Aggregated Heterogeneous Second-Order Thermostatically Controlled Loads for Ancillary Services","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Model predictive control; Control theory (sociology); Population; Smart grid; Grid; Controller (irrigation); Computer science; Control (management); Control engineering; Mathematical optimization; Engineering; Mathematics","score_opus":0.013223003513252243,"score_gpt":0.21021404129947377,"score_spread":0.1969910377862215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340152469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12242802,0.0002694123,0.86709934,0.00032810337,0.00013724061,0.00007284625,0.000092084534,0.00049205957,0.009080763],"genre_scores_gemma":[0.9935628,0.00007113766,0.005183202,0.000019847179,0.000013045663,0.000035402652,0.000027636586,0.000007504193,0.0010794698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976474,0.000047452075,0.000010046001,0.000054827527,0.00008109863,0.00004196142],"domain_scores_gemma":[0.9997273,0.00008983384,0.00006813003,0.000026115427,0.00007147842,0.00001706514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047089602,0.0005728334,0.0005772903,0.0002159457,0.00045965676,0.001102569,0.000795324,0.00031656484,0.0009315525],"category_scores_gemma":[0.0007890411,0.00023720291,0.0003425819,0.00040506164,0.00046439868,0.00065258297,0.0005720079,0.0007573478,0.0001285497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004301944,0.000024693483,0.0003053992,0.000022601718,0.000013479457,0.00004467431,0.000045341538,0.9829799,0.0029400585,0.0043269326,0.0003869358,0.008867085],"study_design_scores_gemma":[0.0000022760844,0.00001152038,0.00006502827,8.6381596e-7,0.0000019003054,0.000002422856,0.000004167124,0.9991015,0.00023701187,0.00046066497,0.000111213805,0.0000014459437],"about_ca_topic_score_codex":0.008708486,"about_ca_topic_score_gemma":0.009094495,"teacher_disagreement_score":0.008708486,"about_ca_system_score_codex":0.00073886814,"about_ca_system_score_gemma":0.0007536185,"threshold_uncertainty_score":0.017315567},"labels":[],"label_agreement":null},{"id":"W2341859722","doi":"","title":"Load shaping via grid wide coordination of heating-cooling electric loads: A mean field games based approach","year":2015,"lang":"en","type":"article","venue":"Les Cahiers du GERAD","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Distributed generation; Aggregate (composite); Load balancing (electrical power); Smoothing; Computer science; Engineering; Renewable energy; Electrical engineering; Mathematics","score_opus":0.01318602606314883,"score_gpt":0.19504715880688955,"score_spread":0.18186113274374072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341859722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047029383,0.0002206552,0.9356033,0.0006328634,0.00007540573,0.0000812777,0.000084398554,0.000120711935,0.01615192],"genre_scores_gemma":[0.9625576,0.00014650452,0.029055974,0.00013534319,0.00003746528,0.00010905582,0.00003677201,0.000038466416,0.007882638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996319,0.00016190736,0.000009172764,0.0000666545,0.000051180257,0.00007922895],"domain_scores_gemma":[0.9993783,0.00035606258,0.00008904545,0.000023279877,0.000076320204,0.000076996075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000816849,0.0009941933,0.0010528237,0.00044417984,0.00050950947,0.0011841689,0.0011126195,0.0010798594,0.0038612154],"category_scores_gemma":[0.001333852,0.0004571551,0.00079870864,0.00032527206,0.0012031696,0.0009569323,0.0013021054,0.001129046,0.0002735641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004417095,0.00002450408,0.00020788598,0.000019788315,0.000022239097,0.00006456415,0.00003516732,0.972635,0.0006821021,0.022532431,0.0006149105,0.0031172629],"study_design_scores_gemma":[0.0000058376954,0.000012658437,0.000038624297,0.0000019983795,0.0000034837835,0.0000045877396,0.000008581266,0.9942268,0.00005530481,0.00548928,0.00014999537,0.000002884068],"about_ca_topic_score_codex":0.007232312,"about_ca_topic_score_gemma":0.00730153,"teacher_disagreement_score":0.007232312,"about_ca_system_score_codex":0.0017575886,"about_ca_system_score_gemma":0.0011318398,"threshold_uncertainty_score":0.014380395},"labels":[],"label_agreement":null},{"id":"W2343090960","doi":"10.1109/tsg.2016.2532885","title":"Non-Intrusive Load Monitoring Using Semi-Supervised Machine Learning and Wavelet Design","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wavelet; Computer science; Machine learning; Artificial intelligence; Process (computing); Supervised learning; Semi-supervised learning; Online machine learning; Pattern recognition (psychology); Artificial neural network","score_opus":0.018967747927057393,"score_gpt":0.21955271756707243,"score_spread":0.20058496964001504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343090960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037631835,0.000030595398,0.9958697,0.000016307744,0.000006613009,0.000012247272,0.000004117868,0.0000972943,0.00019988968],"genre_scores_gemma":[0.34549296,0.00021321641,0.6527133,0.000050498697,0.00005805041,0.00018486987,0.00007101891,0.00009319719,0.0011229293],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899906,0.00038020575,0.00006115406,0.00013271655,0.00039136902,0.000035508678],"domain_scores_gemma":[0.9984554,0.00076176686,0.00023110119,0.00021321209,0.00030681145,0.0000315803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011961357,0.0007243686,0.00083632534,0.0005106114,0.00022222176,0.00067053235,0.0008244016,0.0006368315,0.0006036202],"category_scores_gemma":[0.003003509,0.000407047,0.000596264,0.00045437153,0.0006047468,0.0012107342,0.0006870309,0.0008164245,0.00034662633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003530004,0.00024613738,0.0021589713,0.00037188682,0.0001614858,0.00014225367,0.00023972789,0.3638838,0.07857762,0.01770499,0.0012970867,0.534863],"study_design_scores_gemma":[0.0000051986203,0.000057920213,0.00019672477,0.0000051711477,0.000007146393,0.000037941412,0.0000054741167,0.99169284,0.005888352,0.0016744792,0.00042146735,0.0000072679372],"about_ca_topic_score_codex":0.00028584123,"about_ca_topic_score_gemma":0.00039639036,"teacher_disagreement_score":0.0011961357,"about_ca_system_score_codex":0.00026233835,"about_ca_system_score_gemma":0.00035993234,"threshold_uncertainty_score":0.006325841},"labels":[],"label_agreement":null},{"id":"W2344925178","doi":"10.3390/app6050122","title":"An Enhanced System Architecture for Optimized Demand Side Management in Smart Grid","year":2016,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; University of Alberta","funders":"","keywords":"Computer science; Smart grid; Knapsack problem; Demand response; Carbon footprint; Scheduling (production processes); Architecture; MATLAB; Grid; Distributed computing; Embedded system; Real-time computing; Electricity; Engineering; Operating system; Greenhouse gas; Algorithm; Operations management","score_opus":0.008204597729595357,"score_gpt":0.2133013636004495,"score_spread":0.20509676587085413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344925178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11110461,0.00029210365,0.8655866,0.00036367727,0.00012726295,0.00017554917,0.0002436164,0.006728307,0.015378352],"genre_scores_gemma":[0.9229262,0.00012979445,0.07132609,0.00007144726,0.00003176003,0.00008697126,0.0001825333,0.00006490048,0.005180344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987066,0.000029178866,0.0000077262775,0.000034221663,0.000039859053,0.000018309993],"domain_scores_gemma":[0.9999192,0.0000123118225,0.000008693849,0.000019222316,0.00003174324,0.000008870318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019520267,0.00033798604,0.0003635251,0.0001528702,0.0003053539,0.00077098823,0.0006763867,0.00040571435,0.003198098],"category_scores_gemma":[0.00018137677,0.00015564985,0.00028054244,0.00015542752,0.00020734545,0.00077280327,0.0004222343,0.0004423283,0.00074264733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027770983,0.00021628382,0.0018646441,0.00016627017,0.00007517232,0.0002790327,0.00015049306,0.7974932,0.054344058,0.023116162,0.0049715377,0.1170453],"study_design_scores_gemma":[0.000019089424,0.0000858724,0.00033060365,0.0000052865335,0.000015829552,0.00003547375,0.0000123470945,0.9871373,0.0062140394,0.0022310864,0.00390451,0.000008486989],"about_ca_topic_score_codex":0.0025063083,"about_ca_topic_score_gemma":0.0032486105,"teacher_disagreement_score":0.003198098,"about_ca_system_score_codex":0.000453702,"about_ca_system_score_gemma":0.000642971,"threshold_uncertainty_score":0.010698676},"labels":[],"label_agreement":null},{"id":"W2367823196","doi":"","title":"TOU Power Price Model Based on DSM","year":2007,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Power (physics); Econometrics; Mathematical optimization; Economics; Mathematics","score_opus":0.004694784284641159,"score_gpt":0.19837987013445282,"score_spread":0.19368508584981167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2367823196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09845467,0.00066256075,0.7529582,0.0016271061,0.00040112803,0.0002622426,0.0010742379,0.0007678986,0.1437919],"genre_scores_gemma":[0.9511731,0.0003087949,0.012967887,0.00012537919,0.000064518186,0.0002145432,0.00024278491,0.00010191427,0.034800973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999393,0.00015518378,0.00002188493,0.000108843065,0.00021204958,0.00010900937],"domain_scores_gemma":[0.9995403,0.0001527175,0.00007072237,0.000033628978,0.00016139816,0.000041149324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006205666,0.0007320211,0.0009707799,0.0006067947,0.0006350408,0.0015522268,0.0023166179,0.0013265894,0.007647716],"category_scores_gemma":[0.0021248579,0.00042465443,0.00090780744,0.0008893954,0.0007480804,0.001574107,0.0007919741,0.0012387673,0.00097234943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037583693,0.000025698162,0.00026713492,0.000029080978,0.00001114951,0.000104792955,0.00003582709,0.9610422,0.00048438954,0.033401262,0.0012038504,0.003356989],"study_design_scores_gemma":[0.000006568222,0.0000061659675,0.000052109495,0.0000016139375,0.0000028334616,0.00001000467,0.000005843246,0.9972156,0.000056408637,0.002261353,0.0003780194,0.0000033536382],"about_ca_topic_score_codex":0.017172474,"about_ca_topic_score_gemma":0.008519922,"teacher_disagreement_score":0.017172474,"about_ca_system_score_codex":0.0017338069,"about_ca_system_score_gemma":0.0013296778,"threshold_uncertainty_score":0.034145057},"labels":[],"label_agreement":null},{"id":"W2368505321","doi":"10.1049/iet-rpg.2015.0282","title":"Global energy management system for cooperative networked residential green buildings","year":2016,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Controller (irrigation); Grid; Control (management); Wind power; Energy management; Building management system; Electric power system; Computer science; Power (physics); Engineering; Energy (signal processing); Electrical engineering","score_opus":0.00862517437838843,"score_gpt":0.2025003527020534,"score_spread":0.193875178323665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368505321","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33609757,0.00025409096,0.6299116,0.00032321867,0.00009964551,0.000120062774,0.00014882167,0.0015836735,0.03146124],"genre_scores_gemma":[0.99126863,0.000031767377,0.0057038446,0.000020824176,0.000008425121,0.000031214262,0.000040867526,0.000013553768,0.002880772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998317,0.000044563334,0.0000062099984,0.000055009903,0.000036215017,0.000026314443],"domain_scores_gemma":[0.99989223,0.00002719138,0.000019321538,0.000016522112,0.000030005687,0.000014712838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028885805,0.00045790305,0.0004518681,0.00028298487,0.0005403808,0.00082163716,0.00058120186,0.00050804345,0.004065911],"category_scores_gemma":[0.00031205214,0.00015188885,0.00029548455,0.00034680017,0.00039111357,0.0007980228,0.0010236391,0.00031891037,0.00043474112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014328767,0.00007715135,0.0013476722,0.000035851008,0.000028647974,0.00021753166,0.000117788375,0.9497929,0.0034657342,0.006489321,0.0011960946,0.037087955],"study_design_scores_gemma":[0.000014609058,0.000046907124,0.00027628854,0.0000021892665,0.000009559032,0.000016151673,0.00003091104,0.9959109,0.00054598,0.0021632195,0.0009791157,0.000004275276],"about_ca_topic_score_codex":0.003481359,"about_ca_topic_score_gemma":0.0049177785,"teacher_disagreement_score":0.004065911,"about_ca_system_score_codex":0.0006899633,"about_ca_system_score_gemma":0.00038211775,"threshold_uncertainty_score":0.01360178},"labels":[],"label_agreement":null},{"id":"W2388796209","doi":"10.1109/tpds.2015.2470238","title":"A Distributed and Scalable Approach to Semi-Intrusive Load Monitoring","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Parallel and Distributed Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Science and Technology Commission of Shanghai Municipality; Natural Sciences and Engineering Research Council of Canada; Shanghai Municipal Education Commission; National Natural Science Foundation of China","keywords":"Computer science; Scalability; Metering mode; Distributed computing; Energy consumption; Energy (signal processing); Real-time computing; TRACE (psycholinguistics); Load management; Constraint (computer-aided design); Scale (ratio); Power (physics); Database","score_opus":0.022911886239072584,"score_gpt":0.21629878302235891,"score_spread":0.19338689678328633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2388796209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011910897,0.00007489168,0.98571604,0.00010746753,0.00002197643,0.00004835246,0.000056576675,0.000993982,0.0010699339],"genre_scores_gemma":[0.6824104,0.00014298742,0.314743,0.00009453083,0.000078465804,0.00011944098,0.0002705604,0.00009285356,0.00204776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993432,0.00014967132,0.000029323104,0.00020599698,0.00021360243,0.000058248148],"domain_scores_gemma":[0.9990595,0.00027682527,0.00014242514,0.0003056652,0.00016782519,0.00004771837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066971924,0.0007759938,0.0008472803,0.00054400915,0.00040013267,0.0007115788,0.0015081177,0.00047578447,0.0011784042],"category_scores_gemma":[0.001817176,0.00034151363,0.0004174668,0.0007122501,0.00044453246,0.001337117,0.0012937123,0.00089631695,0.00034009427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019727623,0.00025441882,0.0022376103,0.00011236302,0.00007785215,0.00020020884,0.00013530385,0.70005536,0.023805615,0.011508393,0.0035239516,0.25789163],"study_design_scores_gemma":[0.000007451979,0.000023933273,0.00021193769,0.0000016872877,0.0000048968873,0.00002796221,0.00001633624,0.99498945,0.0014079344,0.002748509,0.0005551333,0.000004741602],"about_ca_topic_score_codex":0.001988444,"about_ca_topic_score_gemma":0.003786211,"teacher_disagreement_score":0.001988444,"about_ca_system_score_codex":0.0004892043,"about_ca_system_score_gemma":0.0008198907,"threshold_uncertainty_score":0.0039538145},"labels":[],"label_agreement":null},{"id":"W2395510365","doi":"10.3233/978-1-60750-583-9-40","title":"Hitting the ground running: Healthgrid deployment and adoption","year":2010,"lang":"en","type":"article","venue":"Studies in health technology and informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lawson Health Research Institute","funders":"","keywords":"Software deployment; Computer science; Computer security; Business; Operating system","score_opus":0.023997700786318212,"score_gpt":0.2900542515772631,"score_spread":0.2660565507909449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2395510365","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8114492,0.00263394,0.014114675,0.11686645,0.00026452765,0.00019080524,0.00021091955,0.00030755313,0.053961918],"genre_scores_gemma":[0.99391186,0.00078349025,0.001769162,0.002052863,0.000049778,0.000032636304,0.00007359455,0.000042236734,0.0012844148],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98347867,0.008798618,0.00082736864,0.001004678,0.0040473794,0.0018433585],"domain_scores_gemma":[0.95991576,0.02725583,0.0040191393,0.0016552567,0.0049134693,0.0022405449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019497836,0.00019964497,0.0003023409,0.00096441846,0.0017500403,0.006665095,0.0010446724,0.0020226403,0.002604716],"category_scores_gemma":[0.06336013,0.00028042318,0.00026365276,0.0022341518,0.0032410535,0.0099285925,0.004118174,0.0022158993,0.00044089239],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004711722,0.0006832029,0.37896803,0.00080716034,0.00010694048,0.002974369,0.12922882,0.0045237863,0.00405353,0.10930985,0.034384944,0.33448824],"study_design_scores_gemma":[0.000117715135,0.0014104292,0.3427299,0.0016205612,0.00012824041,0.002028141,0.4211823,0.013428057,0.0062156385,0.04615432,0.1646947,0.000289953],"about_ca_topic_score_codex":0.013222573,"about_ca_topic_score_gemma":0.011096178,"teacher_disagreement_score":0.019497836,"about_ca_system_score_codex":0.004108858,"about_ca_system_score_gemma":0.0045786714,"threshold_uncertainty_score":0.10311568},"labels":[],"label_agreement":null},{"id":"W2395647033","doi":"10.1109/waina.2016.160","title":"Cost and Load Reduction Using Heuristic Algorithms in Smart Grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Smart grid; Particle swarm optimization; Demand response; Genetic algorithm; Mathematical optimization; Reduction (mathematics); Heuristics; Heuristic; Energy consumption; Schedule; Electricity; Scheduling (production processes); Algorithm; Engineering; Artificial intelligence; Mathematics","score_opus":0.024116383187731537,"score_gpt":0.2291826787525061,"score_spread":0.20506629556477457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2395647033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23801708,0.002114919,0.743397,0.0006479334,0.00014413969,0.00012673411,0.00014185562,0.0007352901,0.01467501],"genre_scores_gemma":[0.8950712,0.00052073854,0.10232341,0.000077896344,0.000026988248,0.00006505194,0.000077480705,0.000039057883,0.0017981908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966335,0.00015872736,0.000011862935,0.000032379096,0.00009234886,0.00004127939],"domain_scores_gemma":[0.99942565,0.000368855,0.00008053971,0.00003712351,0.00006921484,0.000018612302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005738094,0.00042209285,0.00059639505,0.0005800516,0.0002770836,0.00083504844,0.00041641013,0.0005360441,0.000920357],"category_scores_gemma":[0.001433769,0.00027834234,0.00036609624,0.0007061061,0.00036084827,0.0006739484,0.00021310039,0.00033952505,0.0001366776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005094419,0.000043078384,0.00045512192,0.000035313795,0.000025411982,0.000022062359,0.000012762773,0.9739441,0.00066031987,0.002904129,0.00037457322,0.021472272],"study_design_scores_gemma":[0.000011360275,0.000025346206,0.0001399671,0.0000040360856,0.000006158605,0.00000967997,0.000011727575,0.99727005,0.00044191207,0.0017740158,0.00030257297,0.0000030858805],"about_ca_topic_score_codex":0.0059584924,"about_ca_topic_score_gemma":0.0045971465,"teacher_disagreement_score":0.0059584924,"about_ca_system_score_codex":0.00071100873,"about_ca_system_score_gemma":0.0007650312,"threshold_uncertainty_score":0.011847615},"labels":[],"label_agreement":null},{"id":"W2396312483","doi":"10.1109/tste.2016.2569425","title":"Practical Strategies for Storage Operation in Energy Systems: Design and Evaluation","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Tariff; Energy storage; Context (archaeology); Grid; Payment; Distributed generation; Electricity generation; Demand response; Photovoltaic system; Mathematical optimization; Reliability engineering; Operations research; Renewable energy; Electricity; Power (physics); Engineering; Electrical engineering; Economics","score_opus":0.024835496476767863,"score_gpt":0.2604470144705332,"score_spread":0.23561151799376534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2396312483","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38677025,0.002802681,0.59122926,0.00083745125,0.000101123995,0.0010706916,0.00013376199,0.00045578528,0.016599009],"genre_scores_gemma":[0.96120125,0.00031565057,0.037698664,0.00003076264,0.000008854825,0.00014474404,0.000025918678,0.0000135747905,0.00056068157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985952,0.00064971915,0.00006961829,0.00012079635,0.00042484526,0.00013976108],"domain_scores_gemma":[0.99508375,0.0034723599,0.00031961082,0.00021749428,0.0007603084,0.00014648613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031177297,0.0009078982,0.0007966783,0.00059062906,0.00033696758,0.001116638,0.0010636906,0.0012344721,0.0016657098],"category_scores_gemma":[0.0076815938,0.00037231474,0.00032285514,0.0004810429,0.00087205507,0.0011164332,0.00071969995,0.0007757731,0.00015822335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011753754,0.00012473765,0.00049613893,0.00010210367,0.000015509502,0.00003835426,0.00003092306,0.97531873,0.0010323663,0.004803438,0.0001875506,0.01773253],"study_design_scores_gemma":[0.000042537293,0.00020156002,0.00010775302,0.000008477135,0.000009363399,0.000016122485,0.000018504998,0.9973361,0.0007964801,0.0012566886,0.00020143781,0.0000050140948],"about_ca_topic_score_codex":0.003527734,"about_ca_topic_score_gemma":0.002656582,"teacher_disagreement_score":0.003527734,"about_ca_system_score_codex":0.0014288492,"about_ca_system_score_gemma":0.0013678506,"threshold_uncertainty_score":0.016488314},"labels":[],"label_agreement":null},{"id":"W2401914074","doi":"10.1109/icassp.2016.7472319","title":"Real-time joint energy storage management and load scheduling with renewable integration","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Lyapunov optimization; Renewable energy; Dynamic priority scheduling; Scheduling (production processes); Energy storage; Mathematical optimization; Time horizon; Fair-share scheduling; Load management; Distributed computing; Real-time computing; Engineering; Quality of service; Computer network","score_opus":0.006267355766651816,"score_gpt":0.16756777599588082,"score_spread":0.161300420229229,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2401914074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07791026,0.00016110843,0.9169919,0.00027626156,0.00005102971,0.00007136664,0.00004058952,0.00029015724,0.004207385],"genre_scores_gemma":[0.9764525,0.000067017085,0.021974465,0.000030338932,0.000015364438,0.000048099097,0.000017993918,0.000016192942,0.0013779413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964786,0.00009095215,0.000018029135,0.00007776649,0.00008786762,0.00007761556],"domain_scores_gemma":[0.9996594,0.00012337774,0.00009013091,0.000037506175,0.00005697549,0.00003264011],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005579088,0.000566027,0.00062841945,0.00017722542,0.00027418215,0.000823476,0.00066179485,0.00052665424,0.0013667796],"category_scores_gemma":[0.001122876,0.0002701807,0.00039905767,0.00040228537,0.0005584595,0.0009387884,0.0006585289,0.00052547787,0.00017058106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008815509,0.00006991754,0.0003117088,0.00004123617,0.000018674102,0.00007029295,0.000034111927,0.9730699,0.004426608,0.0080266325,0.00031309508,0.013529772],"study_design_scores_gemma":[0.0000090462545,0.00003069103,0.000059842267,0.0000015138309,0.00000397925,0.000007873793,0.0000075100656,0.9971341,0.001016073,0.00158382,0.0001421847,0.0000033555843],"about_ca_topic_score_codex":0.0033466076,"about_ca_topic_score_gemma":0.0033071514,"teacher_disagreement_score":0.0033466076,"about_ca_system_score_codex":0.0005539242,"about_ca_system_score_gemma":0.0010921364,"threshold_uncertainty_score":0.0066542625},"labels":[],"label_agreement":null},{"id":"W2425286272","doi":"10.1109/tsg.2015.2435708","title":"Load Scheduling and Power Trading in Systems With High Penetration of Renewable Energy Resources","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":215,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Revenue; Electric power system; Scheduling (production processes); Computer science; Electricity generation; Schedule; Distributed generation; Grid; Environmental economics; Mathematical optimization; Business; Power (physics); Economics; Engineering; Electrical engineering; Finance","score_opus":0.012119778333591253,"score_gpt":0.18698987890347973,"score_spread":0.17487010056988847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2425286272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12593314,0.0009805791,0.86490846,0.0005468753,0.00010406651,0.000077185425,0.00009352709,0.0002067769,0.0071493317],"genre_scores_gemma":[0.9771328,0.00027831297,0.020766737,0.000052555235,0.00005277014,0.000027316048,0.000033248878,0.00003049785,0.001625752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912375,0.00036576233,0.000034895846,0.00018599202,0.00013506105,0.00015456675],"domain_scores_gemma":[0.99819595,0.0012932516,0.00024736795,0.000069918286,0.00010076128,0.00009276423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012452939,0.00080169854,0.0013963458,0.0003979617,0.0007039155,0.0015855945,0.0010154534,0.00095435965,0.0020711303],"category_scores_gemma":[0.003024155,0.00074051163,0.00045777342,0.0009689544,0.00087432354,0.0016409929,0.0009370026,0.0008208616,0.00020892292],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063175656,0.000026758675,0.00049722026,0.00004911171,0.000029945382,0.00016534013,0.000027674438,0.98093,0.0008392258,0.00795105,0.00033878745,0.009081683],"study_design_scores_gemma":[0.000007383755,0.000014575454,0.00012841752,0.0000021760886,0.000004941675,0.000034543013,0.000017275961,0.99403894,0.00017341187,0.005345047,0.00022933021,0.0000039328834],"about_ca_topic_score_codex":0.005147883,"about_ca_topic_score_gemma":0.0051332396,"teacher_disagreement_score":0.005147883,"about_ca_system_score_codex":0.00093327684,"about_ca_system_score_gemma":0.000711129,"threshold_uncertainty_score":0.010235846},"labels":[],"label_agreement":null},{"id":"W2433974433","doi":"10.1145/2939940.2939945","title":"A multi-agent system of evaluating residential demand response","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"SaskPower","keywords":"Demand response; Computer science; Scheduling (production processes); Electric power system; Load management; Energy management system; Dynamic demand; Energy management; Electricity; Peak demand; Multi-agent system; Electricity market; Reliability engineering; Operations research; Power (physics); Engineering; Energy (signal processing); Operations management","score_opus":0.025373856870385764,"score_gpt":0.25948690498918053,"score_spread":0.23411304811879477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2433974433","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2888389,0.00013080871,0.6962912,0.00025972,0.00009581154,0.0007238704,0.0003350568,0.0014933345,0.011831192],"genre_scores_gemma":[0.9266796,0.00003639833,0.071315534,0.000022556203,0.000011029611,0.00030492462,0.00012013,0.000023266843,0.0014864354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862456,0.0008055067,0.00006784227,0.00019960862,0.00023066228,0.000071731476],"domain_scores_gemma":[0.9986482,0.0005699882,0.00018007253,0.00011383598,0.00039091083,0.00009684815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020267796,0.00075428525,0.0006960708,0.000671021,0.00050013966,0.0012640902,0.0008045581,0.0007050544,0.0019911826],"category_scores_gemma":[0.0038609602,0.00021205512,0.00030504572,0.0003895734,0.0004195015,0.000848261,0.0006514125,0.0006223317,0.0002866851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003730115,0.00026660756,0.0045075165,0.0001003342,0.00010719981,0.0001787738,0.00013971188,0.9462409,0.005357824,0.008848081,0.00081622286,0.03306384],"study_design_scores_gemma":[0.000017782619,0.00006534605,0.00025471614,0.000002065443,0.000008615604,0.000006555312,0.000016374259,0.9977779,0.0009172313,0.0006194584,0.00030794975,0.000005983121],"about_ca_topic_score_codex":0.004754832,"about_ca_topic_score_gemma":0.0036082868,"teacher_disagreement_score":0.004754832,"about_ca_system_score_codex":0.0012994015,"about_ca_system_score_gemma":0.0010027766,"threshold_uncertainty_score":0.010718763},"labels":[],"label_agreement":null},{"id":"W243407427","doi":"","title":"Interruptible Load Management: Literature and Practice","year":2001,"lang":"en","type":"article","venue":"Chalmers Research (Chalmers University of Technology)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic shortage; Electricity; Load management; Computer science; Electricity market; Load balancing (electrical power); Operations research; Electric power system; Industrial organization; Environmental economics; Business; Engineering; Economics; Electrical engineering; Power (physics); Geography","score_opus":0.025992754811524087,"score_gpt":0.27287786299397504,"score_spread":0.24688510818245096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W243407427","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007065504,0.8803164,0.028032621,0.008653489,0.00092164805,0.00006812768,0.00009113093,0.00020032092,0.07465071],"genre_scores_gemma":[0.119480185,0.85421765,0.017950142,0.0018819545,0.0010844648,0.000103494865,0.00020056001,0.00008045435,0.005001116],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99773455,0.00070205843,0.0002685518,0.00045013032,0.00072445883,0.00012019351],"domain_scores_gemma":[0.9904847,0.006713686,0.00051204296,0.0004670771,0.0015594439,0.00026302593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030181298,0.00074101775,0.0008420528,0.0049455236,0.0012655696,0.0061772736,0.002633443,0.0034268931,0.0045012934],"category_scores_gemma":[0.01300524,0.00057854154,0.00027717953,0.01142341,0.0044568283,0.0053013493,0.0018643077,0.001897395,0.0013892964],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008503194,0.0002193711,0.0016180987,0.0064558485,0.000036597845,0.00035875762,0.0032002856,0.005902297,0.00054139853,0.13818355,0.020542916,0.82285595],"study_design_scores_gemma":[0.000029700144,0.00016845866,0.0028793206,0.021549243,0.00005558441,0.0015971111,0.006930172,0.005465181,0.001433839,0.11485895,0.8449513,0.000081143546],"about_ca_topic_score_codex":0.00466319,"about_ca_topic_score_gemma":0.0035284243,"teacher_disagreement_score":0.0061772736,"about_ca_system_score_codex":0.0031353023,"about_ca_system_score_gemma":0.0037709554,"threshold_uncertainty_score":0.022748351},"labels":[],"label_agreement":null},{"id":"W2438794591","doi":"10.1145/2939912.2939914","title":"A framework for occupancy-aided energy disaggregation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Occupancy; Energy (signal processing); Computer science; Overhead (engineering); Energy consumption; Interval (graph theory); Energy demand; Metering mode; Simple (philosophy); Real-time computing; Statistics; Environmental economics; Engineering; Mathematics; Architectural engineering; Electrical engineering","score_opus":0.01315349359062483,"score_gpt":0.22307314218560748,"score_spread":0.20991964859498263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2438794591","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009374588,0.00014970558,0.9962192,0.000079330195,0.000048051035,0.00003514644,0.00012948034,0.00048751605,0.0019140543],"genre_scores_gemma":[0.2783342,0.00068449095,0.7135595,0.00015789873,0.00019431769,0.0002860648,0.00078353955,0.00036936172,0.005630679],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855703,0.000403011,0.0000846981,0.00026479934,0.0005051705,0.00018515704],"domain_scores_gemma":[0.9991841,0.0003070901,0.00007290983,0.0001766938,0.00019415494,0.0000651009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015176724,0.0010276899,0.0012154503,0.00089271937,0.000802501,0.002000737,0.0027483278,0.0010343613,0.0067395773],"category_scores_gemma":[0.003957867,0.00067483366,0.0013128088,0.0018867896,0.00070106314,0.0020493183,0.0031322408,0.0015303063,0.0012832597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007635698,0.00006703175,0.0009472734,0.00015818862,0.00007857694,0.00022607282,0.000229861,0.74004483,0.0018766598,0.17567733,0.007672487,0.07294526],"study_design_scores_gemma":[0.000009900168,0.000013252717,0.00010456079,0.0000137829975,0.000011733342,0.00004682772,0.000028084833,0.9630334,0.0003674511,0.028110184,0.008246145,0.0000146334405],"about_ca_topic_score_codex":0.013451016,"about_ca_topic_score_gemma":0.015625289,"teacher_disagreement_score":0.013451016,"about_ca_system_score_codex":0.0010198413,"about_ca_system_score_gemma":0.0021745977,"threshold_uncertainty_score":0.026745439},"labels":[],"label_agreement":null},{"id":"W2465358378","doi":"10.1109/tsg.2016.2584581","title":"Toward Non-Intrusive Load Monitoring via Multi-Label Classification","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":306,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart grid; Key (lock); Multi-label classification; Bespoke; Demand response; Wavelet; Machine learning; Domain (mathematical analysis); Class (philosophy); Artificial intelligence; Data mining; Electricity; Engineering; Computer security","score_opus":0.03955868261262701,"score_gpt":0.24530920191768202,"score_spread":0.205750519305055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2465358378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048913512,0.0010766485,0.9439951,0.00065143633,0.00011683225,0.00017717334,0.0004527668,0.0021120703,0.0025044505],"genre_scores_gemma":[0.49125832,0.00046211542,0.50246406,0.0004112206,0.00022090868,0.00022434,0.0014889567,0.0001492802,0.0033208688],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99650526,0.001356205,0.00015310632,0.00080196036,0.0010164874,0.0001669144],"domain_scores_gemma":[0.9913857,0.004156237,0.0012662269,0.0013418563,0.001695611,0.00015450211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003730531,0.0011750399,0.0012364078,0.0023803012,0.00082490215,0.0021885035,0.0021078936,0.0016013249,0.0010198064],"category_scores_gemma":[0.010625298,0.00038108532,0.00076982315,0.0020192282,0.00065713364,0.004172766,0.0015403859,0.0021282618,0.0012277366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052402576,0.0008057637,0.014861854,0.00034060478,0.00014619947,0.000112341615,0.00029778652,0.07072812,0.011957221,0.005314789,0.007161303,0.8877501],"study_design_scores_gemma":[0.000031184405,0.00012076133,0.003123593,0.000049243426,0.000038883863,0.00008195712,0.00017873583,0.9678246,0.009101103,0.015016529,0.004397323,0.000035982346],"about_ca_topic_score_codex":0.002344392,"about_ca_topic_score_gemma":0.004520492,"teacher_disagreement_score":0.003730531,"about_ca_system_score_codex":0.0008218533,"about_ca_system_score_gemma":0.0009606758,"threshold_uncertainty_score":0.019729197},"labels":[],"label_agreement":null},{"id":"W2465806284","doi":"10.1109/tsg.2016.2590147","title":"Water-Filling Exact Solutions for Load Balancing of Smart Power Grid Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Load balancing (electrical power); Mathematical optimization; Load management; Computer science; Smart grid; Load regulation; Grid; Dynamic demand; Power (physics); Electric power system; Optimization problem; Distributed computing; Mathematics; Engineering","score_opus":0.01497289901180364,"score_gpt":0.20415390071576944,"score_spread":0.1891810017039658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2465806284","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075549814,0.00041192072,0.98698956,0.00017914268,0.00005404749,0.000040008137,0.000044478355,0.000179565,0.0045463103],"genre_scores_gemma":[0.53903615,0.0008090196,0.453391,0.00017708611,0.00007391769,0.0002521478,0.00020873047,0.00021448746,0.005837548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997377,0.00008603485,0.000011188667,0.0000365713,0.00008256857,0.000045960627],"domain_scores_gemma":[0.9994728,0.00036215124,0.000038774517,0.000039203078,0.00006652159,0.00002062182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006885874,0.00094491616,0.001028716,0.00044458357,0.00050391786,0.00087198697,0.0007858063,0.0009444354,0.0041586286],"category_scores_gemma":[0.0028800701,0.00049710827,0.0005247639,0.0008560895,0.00079060317,0.0013763714,0.00085685373,0.001214384,0.00046382737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004976784,0.000034401943,0.00018395491,0.00011940347,0.000018372355,0.00004603884,0.00006400082,0.91894925,0.00080216664,0.04052298,0.0018894582,0.037320204],"study_design_scores_gemma":[0.0000059511863,0.0000070279643,0.000014615442,0.000004715235,0.0000014930798,0.0000045418897,0.000009843498,0.98501915,0.00013456911,0.014284728,0.00051156967,0.0000018095616],"about_ca_topic_score_codex":0.0043750065,"about_ca_topic_score_gemma":0.005090785,"teacher_disagreement_score":0.0043750065,"about_ca_system_score_codex":0.0008102603,"about_ca_system_score_gemma":0.0012499706,"threshold_uncertainty_score":0.0139119625},"labels":[],"label_agreement":null},{"id":"W2467667935","doi":"10.3390/en9070542","title":"Real Time Information Based Energy Management Using Customer Preferences and Dynamic Pricing in Smart Homes","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Thermostat; Demand response; Schedule; Electricity; Computer science; Energy management; Optimization problem; Home automation; Real-time computing; Automotive engineering; Engineering; Energy (signal processing); Algorithm; Telecommunications; Electrical engineering","score_opus":0.0044533730095101046,"score_gpt":0.18156891882136658,"score_spread":0.17711554581185648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2467667935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22993496,0.00093764294,0.76237154,0.00047323605,0.00008526648,0.0000607517,0.00006289177,0.00051616516,0.005557587],"genre_scores_gemma":[0.97764856,0.00019513987,0.021357143,0.000042790205,0.000019747222,0.0000181619,0.000023236556,0.000015335829,0.0006799619],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996877,0.000106289895,0.000014875786,0.000074160074,0.000072267445,0.000044796536],"domain_scores_gemma":[0.9997358,0.00012624747,0.00005593768,0.000022889204,0.000040730552,0.000018483655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048488073,0.0004670081,0.0006991019,0.00022280203,0.0002503934,0.0007198495,0.00076480635,0.0005332568,0.00054058654],"category_scores_gemma":[0.00082504837,0.00029817928,0.00026257607,0.00050278916,0.00040263357,0.0013698289,0.0004195681,0.00045736015,0.00009995043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013377547,0.00012642653,0.0017803165,0.000051266292,0.000045802197,0.00010697516,0.000071303715,0.9215824,0.003913823,0.007270802,0.0008347538,0.06408236],"study_design_scores_gemma":[0.0000066408456,0.000027983733,0.00031404576,0.0000017501645,0.00000744185,0.000018760085,0.000016578137,0.9964373,0.000727556,0.0021451965,0.0002910671,0.0000057873285],"about_ca_topic_score_codex":0.0028048053,"about_ca_topic_score_gemma":0.0030150427,"teacher_disagreement_score":0.0028048053,"about_ca_system_score_codex":0.00053536013,"about_ca_system_score_gemma":0.00039003533,"threshold_uncertainty_score":0.005576968},"labels":[],"label_agreement":null},{"id":"W2479551579","doi":"10.1155/2016/3161060","title":"Power Consumption: Base Stations of Telecommunication in Sahel Zone of Cameroon: Typology Based on the Power Consumption—Model and Energy Savings","year":2016,"lang":"en","type":"article","venue":"Journal of Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Base station; Energy consumption; Telecommunications; Power consumption; Consumption (sociology); Power (physics); Work (physics); Engineering; Air conditioning; Base (topology); Efficient energy use; Electrical engineering; Energy (signal processing); Audit; Environmental science; Business; Mechanical engineering","score_opus":0.016176147558412117,"score_gpt":0.22503709844366282,"score_spread":0.2088609508852507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2479551579","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93762875,0.00087876787,0.032314297,0.00031813054,0.00003923754,0.00011758186,0.0017512373,0.00014967752,0.026802402],"genre_scores_gemma":[0.9953157,0.00024201383,0.0020460817,0.000010145393,0.000004677947,0.000039704722,0.00034696152,0.000009859074,0.001984938],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980026,0.0000462964,0.000008604095,0.00003195565,0.000042384294,0.00007048816],"domain_scores_gemma":[0.9998604,0.00004597074,0.000030085219,0.000014562392,0.00003724845,0.000011699626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018715159,0.0006456256,0.00018263755,0.0017971728,0.0005240983,0.0013645666,0.00053307845,0.0003376094,0.0037124064],"category_scores_gemma":[0.0004897731,0.0001704427,0.00035212928,0.0034940555,0.0003855382,0.00097052654,0.000365586,0.00024812386,0.0002928179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069508085,0.0001543895,0.23991998,0.0003351092,0.0001577267,0.0021610302,0.0016960924,0.56138945,0.008910689,0.06645377,0.0057578688,0.11236877],"study_design_scores_gemma":[0.000038731556,0.00032380738,0.19457705,0.00018910621,0.00012341457,0.0011014397,0.0072604013,0.7466445,0.0075101242,0.013426583,0.028729107,0.00007571491],"about_ca_topic_score_codex":0.04753647,"about_ca_topic_score_gemma":0.03427358,"teacher_disagreement_score":0.04753647,"about_ca_system_score_codex":0.0018255545,"about_ca_system_score_gemma":0.00043585966,"threshold_uncertainty_score":0.094519556},"labels":[],"label_agreement":null},{"id":"W2498473652","doi":"10.1109/tdc.2016.7519876","title":"Optimal electricity pricing in a microgrid network","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Microgrid; Mathematical optimization; Electricity; Marginal cost; Computer science; Grid; Electricity market; Boundary (topology); Electricity pricing; Distributed generation; Electricity generation; Economics; Power (physics); Renewable energy; Mathematics; Microeconomics; Engineering","score_opus":0.004624741883147336,"score_gpt":0.17261202712782409,"score_spread":0.16798728524467674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2498473652","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27420032,0.0006129854,0.7051468,0.0011013079,0.00008084824,0.00009549346,0.00019908066,0.00028316124,0.018280098],"genre_scores_gemma":[0.96990997,0.00020346095,0.026981989,0.0000435039,0.000019146162,0.000042501644,0.000040384683,0.000030836236,0.0027281458],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959964,0.00022237738,0.000009804762,0.000058608442,0.00005269217,0.00005698143],"domain_scores_gemma":[0.9996327,0.00021853896,0.000048592537,0.000019301036,0.000047713613,0.000033112563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006733525,0.00058528857,0.0009241571,0.00036473104,0.00045635615,0.0013578876,0.0007475712,0.0009150726,0.0020182848],"category_scores_gemma":[0.0020867605,0.00050143735,0.00043416713,0.00052299345,0.0007377428,0.0014045895,0.00077106105,0.000794479,0.00016023475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046682053,0.000020263928,0.0002725537,0.000020754802,0.000010084011,0.000037389655,0.000017467464,0.9816699,0.00041883992,0.012283482,0.0004112135,0.0047913855],"study_design_scores_gemma":[0.0000056044887,0.000010017395,0.000040814935,0.0000012172534,0.0000022218617,0.0000048051425,0.000008835887,0.99532855,0.00006568074,0.0044220407,0.0001086228,0.0000016665592],"about_ca_topic_score_codex":0.0069372617,"about_ca_topic_score_gemma":0.00555033,"teacher_disagreement_score":0.0069372617,"about_ca_system_score_codex":0.0014749533,"about_ca_system_score_gemma":0.001034217,"threshold_uncertainty_score":0.0137937665},"labels":[],"label_agreement":null},{"id":"W2502311290","doi":"10.3390/en9080593","title":"Energy Optimization in Smart Homes Using Customer Preference and Dynamic Pricing","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Schedule; Computer science; Electricity; Mathematical optimization; Energy consumption; Dynamic pricing; Optimization problem; Energy (signal processing); Control (management); Preference; Operations research; Simulation; Real-time computing; Engineering; Economics; Artificial intelligence; Microeconomics; Mathematics; Algorithm; Electrical engineering","score_opus":0.010393398924438954,"score_gpt":0.19309263126187567,"score_spread":0.18269923233743673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2502311290","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13405688,0.00034454223,0.8565791,0.0003006663,0.000047734487,0.0000616753,0.00006893013,0.00020088423,0.008339545],"genre_scores_gemma":[0.9503408,0.00014217543,0.04711311,0.000058266596,0.000013579592,0.000034357137,0.000037765036,0.00003904455,0.0022209806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994917,0.00023208508,0.000012470533,0.00007413323,0.00011575279,0.00007385661],"domain_scores_gemma":[0.9997594,0.00014410599,0.000028840139,0.000019598177,0.000032979027,0.000015095315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063091656,0.00043796792,0.0006426197,0.0002132258,0.0002447468,0.00063406804,0.0005441736,0.00044756173,0.002199461],"category_scores_gemma":[0.0010564774,0.0003574447,0.00034431246,0.00074404635,0.00029818696,0.0010143371,0.00042312377,0.00046251473,0.00017012414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008536847,0.000068731046,0.0008317866,0.00003461285,0.000031069394,0.000058477322,0.000028114511,0.9580807,0.0019461857,0.010761346,0.00065516576,0.02741848],"study_design_scores_gemma":[0.000005656757,0.00002860548,0.00021886104,0.0000012707128,0.0000044439025,0.0000156557,0.000014715616,0.9953939,0.00043343456,0.003537524,0.0003419182,0.0000040918967],"about_ca_topic_score_codex":0.0026170039,"about_ca_topic_score_gemma":0.004657335,"teacher_disagreement_score":0.0026170039,"about_ca_system_score_codex":0.000566547,"about_ca_system_score_gemma":0.000552829,"threshold_uncertainty_score":0.007357955},"labels":[],"label_agreement":null},{"id":"W2503331769","doi":"10.1007/978-3-319-29446-9_4","title":"Conventional Energy and Power System","year":2016,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Power Generation","funders":"","keywords":"Electricity; Secondary sector of the economy; Economic shortage; Electric power; Agricultural economics; Power (physics); Natural resource economics; Business; Engineering; Operations management; Economics; Economy; Electrical engineering","score_opus":0.005508203684535036,"score_gpt":0.15296605366532526,"score_spread":0.14745784998079023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2503331769","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00060128863,0.011309512,0.0062923804,0.0012513737,0.0015830164,0.000016562251,0.000060785278,0.00010555641,0.9787796],"genre_scores_gemma":[0.010618911,0.011230769,0.0025075309,0.00071194157,0.0006905335,0.000024691424,0.0001047667,0.00011942538,0.9739914],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99983454,0.000023328474,0.000005618174,0.000029468136,0.00009344997,0.000013627376],"domain_scores_gemma":[0.9999529,0.000011869834,0.00000302444,0.000011546098,0.000015798014,0.0000048206452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014000926,0.00085369544,0.0003549569,0.0007141127,0.0007800266,0.0021196222,0.00051855895,0.0007909363,0.03561034],"category_scores_gemma":[0.00028332177,0.0002454633,0.000215892,0.00106089,0.0010986396,0.002128194,0.0008789338,0.0017745087,0.014311992],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011031786,0.00003491983,0.00006969405,0.00020700754,0.000004973706,0.00006439097,0.00033576455,0.0011263732,0.00081567996,0.49161577,0.29906386,0.2066505],"study_design_scores_gemma":[0.000001060239,0.000005513159,0.000081995524,0.00006618344,0.0000013714546,0.000046340767,0.000052217285,0.00027754842,0.00012656901,0.047412258,0.95192623,0.000002669195],"about_ca_topic_score_codex":0.0025007473,"about_ca_topic_score_gemma":0.00788093,"teacher_disagreement_score":0.03561034,"about_ca_system_score_codex":0.0013903838,"about_ca_system_score_gemma":0.0011743177,"threshold_uncertainty_score":0.119128466},"labels":[],"label_agreement":null},{"id":"W2505600910","doi":"10.1109/pestse.2016.7516468","title":"The effect of solar PV module price and capital cost on the levelized electricity cost of the solar PV power plant in the context of India","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Cost of electricity by source; Grid parity; Photovoltaic system; Capital cost; Renewable energy; Context (archaeology); Stand-alone power system; Power station; Environmental economics; Electricity; Electricity generation; Environmental science; Engineering; Electrical engineering; Photovoltaics; Economics; Distributed generation; Power (physics); Physics; Geography","score_opus":0.005182613017970826,"score_gpt":0.17886828502298607,"score_spread":0.17368567200501525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2505600910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9888144,0.00040610958,0.0018002752,0.00016143234,0.000013919822,0.000013024774,0.00030185285,0.000035699402,0.008453391],"genre_scores_gemma":[0.99910384,0.00009320444,0.00022155623,0.000009844186,0.0000035840508,0.0000021820201,0.00008751264,0.0000070803253,0.00047114157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994842,0.00011648524,0.000023368697,0.00006046345,0.00014542352,0.0001700134],"domain_scores_gemma":[0.9959519,0.002409215,0.0006334292,0.00022273598,0.00064581656,0.00013690692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045046478,0.00022863787,0.0002789382,0.00049766916,0.00023599538,0.0017110028,0.0006622485,0.00038180494,0.002718086],"category_scores_gemma":[0.0031899787,0.00017179894,0.00058188615,0.0009883582,0.00044298763,0.00088474626,0.0003749359,0.00075831875,0.00022592608],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001313423,0.00022813292,0.15382884,0.00048471868,0.0003618916,0.004255369,0.00027086548,0.7571113,0.023043284,0.00993958,0.0015571081,0.04760554],"study_design_scores_gemma":[0.00004218107,0.0018398889,0.7649123,0.0000593647,0.0004777761,0.0025548576,0.0017752823,0.18691641,0.031558324,0.0030737775,0.006608545,0.00018130602],"about_ca_topic_score_codex":0.011064122,"about_ca_topic_score_gemma":0.012181922,"teacher_disagreement_score":0.011064122,"about_ca_system_score_codex":0.0016804906,"about_ca_system_score_gemma":0.0005857423,"threshold_uncertainty_score":0.021999419},"labels":[],"label_agreement":null},{"id":"W2505614348","doi":"10.1504/ijgw.2016.077911","title":"Modelling residential house electricity demand profile and analysis of peaksaver program using ANN: case study for Toronto, Canada","year":2016,"lang":"en","type":"article","venue":"International Journal of Global Warming","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Electricity; Electricity demand; Environmental science; Energy demand; Peak load; Peak demand; Demand response; Electricity generation; Agricultural economics; Environmental engineering; Environmental economics; Engineering; Economics; Automotive engineering; Power (physics)","score_opus":0.014754143373211938,"score_gpt":0.2771580823467446,"score_spread":0.26240393897353265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2505614348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98883855,0.000093012175,0.004057662,0.00010556973,0.000006504629,0.000052468647,0.0012471998,0.000108027074,0.0054909694],"genre_scores_gemma":[0.9952123,0.00007568366,0.0016863361,0.000007596035,0.0000015117839,0.000012516986,0.00069481443,0.000009227994,0.0022999507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986875,0.0000172055,0.0000067072165,0.000023656687,0.00003848298,0.000045214234],"domain_scores_gemma":[0.9997429,0.00008241402,0.000018548666,0.000012874288,0.00011789602,0.000025273454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021889561,0.00055117847,0.00029084386,0.00046521547,0.0007060956,0.00062177255,0.0007681747,0.00045090253,0.0013052872],"category_scores_gemma":[0.0004408592,0.00025019702,0.00045769228,0.001146415,0.000278058,0.00024304206,0.00021696482,0.00028398895,0.00012720413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001705267,0.00013010182,0.048692554,0.00009960775,0.000053668027,0.0011227325,0.00020373594,0.93120164,0.0021182206,0.0011988292,0.0021340218,0.012874439],"study_design_scores_gemma":[0.000009480622,0.000031533644,0.0272937,0.000005983757,0.0000153838,0.000034122055,0.00031342733,0.9708575,0.00076229847,0.00011557685,0.0005451129,0.000015917882],"about_ca_topic_score_codex":0.9557538,"about_ca_topic_score_gemma":0.96127903,"teacher_disagreement_score":0.044246197,"about_ca_system_score_codex":0.010136802,"about_ca_system_score_gemma":0.003864944,"threshold_uncertainty_score":0.08901352},"labels":[],"label_agreement":null},{"id":"W2508374117","doi":"10.5267/j.uscm.2016.6.001","title":"Optimization methods applied to renewable and sustainable energy: A review","year":2016,"lang":"en","type":"review","venue":"Uncertain Supply Chain Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Sustainable energy; Environmental economics; Energy (signal processing); Business; Computer science; Natural resource economics; Economics; Engineering","score_opus":0.01641187370140484,"score_gpt":0.28481063987123284,"score_spread":0.268398766169828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2508374117","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00032651637,0.9932713,0.0035863288,0.00027630257,0.00026550505,0.000011500689,0.000030831023,0.0000149722,0.0022167834],"genre_scores_gemma":[0.0036421027,0.99185914,0.003180072,0.00010440482,0.00029091645,0.000017867384,0.000056972553,0.00001022013,0.00083838246],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994025,0.000142149,0.000105348736,0.00009103758,0.00022668127,0.000032289405],"domain_scores_gemma":[0.9986533,0.00088414486,0.00011651845,0.000037310463,0.0002836643,0.000025003712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009786241,0.0011506754,0.0015588417,0.0028671694,0.00032120495,0.0015605586,0.00090657605,0.0009792253,0.004274994],"category_scores_gemma":[0.002418046,0.00046881,0.0012261671,0.005862773,0.00041996184,0.0014523331,0.0006256531,0.0010691473,0.0013021606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051250383,0.00008837708,0.0005209901,0.034095455,0.00031018464,0.00021066389,0.00013873346,0.0046772943,0.0010746958,0.013468206,0.019509573,0.92585456],"study_design_scores_gemma":[0.000022721806,0.00015967811,0.0027048746,0.01746216,0.0005209307,0.0013330407,0.00025629628,0.0050790384,0.0015589083,0.015370606,0.95545423,0.00007750796],"about_ca_topic_score_codex":0.001913989,"about_ca_topic_score_gemma":0.0019877166,"teacher_disagreement_score":0.004274994,"about_ca_system_score_codex":0.0005797222,"about_ca_system_score_gemma":0.0016821761,"threshold_uncertainty_score":0.0143013},"labels":[],"label_agreement":null},{"id":"W2510963664","doi":"10.1016/j.enbuild.2016.08.008","title":"Exploiting heuristic algorithms to efficiently utilize energy management controllers with renewable energy sources","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Computer science; Energy management; Firefly algorithm; Mathematical optimization; Smart grid; Genetic algorithm; Particle swarm optimization; Controller (irrigation); Heuristic; Benchmark (surveying); Renewable energy; Algorithm; Energy (signal processing); Engineering; Mathematics; Artificial intelligence","score_opus":0.00469863525584784,"score_gpt":0.16639660687099928,"score_spread":0.16169797161515143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2510963664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09740591,0.0005444995,0.8862556,0.00036042283,0.00019318759,0.00018095702,0.00010021656,0.0009363468,0.014022786],"genre_scores_gemma":[0.83966184,0.00013921488,0.1581283,0.000132005,0.000052972453,0.00014033928,0.00010900425,0.00005837087,0.0015779109],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996828,0.000120652716,0.000015535175,0.000043903998,0.00006960743,0.000067551526],"domain_scores_gemma":[0.9987355,0.00092670735,0.000102298916,0.00007804566,0.00011605824,0.000041370593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007683369,0.0010190319,0.0008324415,0.000739667,0.00053596136,0.0011818345,0.00084999047,0.0010783108,0.0025249512],"category_scores_gemma":[0.0028354835,0.00055715186,0.00046635434,0.0006774857,0.00050588796,0.0009218661,0.00058325817,0.0007792242,0.00028263353],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010490575,0.00009953071,0.00048985943,0.000040525967,0.000040871328,0.000050100574,0.000019642825,0.95849127,0.00070443255,0.0054766987,0.0010252811,0.033456933],"study_design_scores_gemma":[0.000018902483,0.000016013379,0.000034720633,0.0000028502252,0.000006810568,0.000007400314,0.0000067569104,0.9979019,0.00022839996,0.0016136412,0.00016059635,0.0000020139644],"about_ca_topic_score_codex":0.00422357,"about_ca_topic_score_gemma":0.0070699183,"teacher_disagreement_score":0.00422357,"about_ca_system_score_codex":0.0006509868,"about_ca_system_score_gemma":0.0014622429,"threshold_uncertainty_score":0.008446753},"labels":[],"label_agreement":null},{"id":"W2519547876","doi":"10.1115/1.2009-dec-1","title":"Building the New Electric Grid","year":2009,"lang":"en","type":"article","venue":"Mechanical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CARE Canada","funders":"","keywords":"Electrification; Smart grid; Grid; Control (management); Computer science; Electricity; Telecommunications; Computer security; Systems engineering; Electrical engineering; Engineering","score_opus":0.004669840081651073,"score_gpt":0.17961593713401508,"score_spread":0.174946097052364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2519547876","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027643716,0.013499775,0.21664965,0.093224645,0.011943991,0.00015251638,0.0004324301,0.0050215065,0.6314318],"genre_scores_gemma":[0.47831973,0.031019773,0.20440537,0.024630405,0.0035827341,0.00027481778,0.0011624985,0.0014256419,0.25517905],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993411,0.00015076708,0.000022008993,0.000106384454,0.0002725045,0.000107291155],"domain_scores_gemma":[0.9993112,0.00008963918,0.000029641875,0.0001548029,0.00021978858,0.00019484262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013753225,0.00042360686,0.00023779258,0.0005082105,0.0011600339,0.0037087114,0.000883093,0.0013944727,0.012358336],"category_scores_gemma":[0.0020882385,0.00024742552,0.00026191748,0.00061213993,0.0017422729,0.012078955,0.004190655,0.0022277432,0.004597574],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034914076,0.00005684858,0.0010450856,0.00013826179,0.000018247763,0.00036681947,0.0007667719,0.0030672483,0.0017004975,0.7127352,0.12668858,0.15338151],"study_design_scores_gemma":[0.0000072015487,0.00002262711,0.00015420486,0.00006616234,0.000004348359,0.0001376087,0.000382681,0.0014719072,0.00039169678,0.09674836,0.90060383,0.000009383028],"about_ca_topic_score_codex":0.0017665253,"about_ca_topic_score_gemma":0.0025193251,"teacher_disagreement_score":0.012358336,"about_ca_system_score_codex":0.0011997512,"about_ca_system_score_gemma":0.0020534974,"threshold_uncertainty_score":0.041342735},"labels":[],"label_agreement":null},{"id":"W2521596927","doi":"10.1109/tii.2016.2610951","title":"A Game Theoretic Approach to Real-Time Robust Distributed Generation Dispatch","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Scalability; Computer science; Distributed generation; Distributed computing; Electricity generation; Smart grid; Grid; Population; Mathematical optimization; Economic dispatch; Electric power system; Power (physics); Engineering; Renewable energy; Electrical engineering","score_opus":0.0341092185378073,"score_gpt":0.20642373274700226,"score_spread":0.17231451420919497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2521596927","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020775155,0.00015113092,0.99044657,0.0003089078,0.0000618323,0.000048329828,0.000034919463,0.00004763194,0.006823094],"genre_scores_gemma":[0.71926314,0.000982576,0.2645361,0.00037163423,0.00029449086,0.00053327694,0.0001299629,0.00012060641,0.013768085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986343,0.00069138774,0.00005190494,0.00019749343,0.00029832078,0.00012661584],"domain_scores_gemma":[0.9985915,0.0009492676,0.00013713945,0.0000536139,0.00016359717,0.00010487297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019604987,0.0016796498,0.0012910825,0.000693209,0.0006226722,0.0019849497,0.0022865096,0.0015593658,0.0044028983],"category_scores_gemma":[0.003916914,0.00064662687,0.0011001539,0.0008566207,0.0019837192,0.0019261194,0.0015020209,0.002506442,0.00055035163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017717295,0.000021826174,0.00006396535,0.000032761312,0.000023761419,0.000070666785,0.000040434035,0.8679392,0.00037133967,0.1260063,0.0007517936,0.0046602758],"study_design_scores_gemma":[0.000010907945,0.00001601356,0.00001578312,0.0000036823494,0.0000043180057,0.000011913009,0.000008514298,0.96676254,0.0000654214,0.032191917,0.0009032635,0.0000057292623],"about_ca_topic_score_codex":0.0050078603,"about_ca_topic_score_gemma":0.003903045,"teacher_disagreement_score":0.0050078603,"about_ca_system_score_codex":0.0025086817,"about_ca_system_score_gemma":0.0018273299,"threshold_uncertainty_score":0.018201888},"labels":[],"label_agreement":null},{"id":"W2523708194","doi":"10.1145/2950046","title":"A Truthful Incentive Mechanism for Emergency Demand Response in Geo-Distributed Colocation Data Centers","year":2016,"lang":"en","type":"article","venue":"ACM Transactions on Modeling and Performance Evaluation of Computing Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; National Science Foundation","keywords":"Incentive; Computer science; Demand response; Server; Backup; Remuneration; Environmental economics; Load management; Computer security; Electricity; Business; Database; Computer network; Finance; Microeconomics; Economics; Engineering","score_opus":0.06528025906781529,"score_gpt":0.2937210611257679,"score_spread":0.2284408020579526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523708194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06935896,0.00036479623,0.9198329,0.0013007162,0.00023379088,0.00033755388,0.00025913285,0.0006932566,0.007618964],"genre_scores_gemma":[0.9334316,0.00016991439,0.0627755,0.00020513344,0.000076678356,0.00014193171,0.00008536771,0.000050918978,0.0030629004],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99719256,0.0011890007,0.0001532477,0.00055327296,0.00048229555,0.00042972417],"domain_scores_gemma":[0.99173707,0.004858758,0.001032453,0.000980989,0.0007335425,0.00065718184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048906775,0.0008516739,0.0014490183,0.0006686584,0.0010593054,0.002162576,0.0034806712,0.002203215,0.0058119614],"category_scores_gemma":[0.014006787,0.0006476732,0.0008947048,0.0008527061,0.001733542,0.0037897127,0.0023194696,0.0023739913,0.00061988505],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017597068,0.0006852197,0.0017328976,0.0004918152,0.00012667097,0.00088698586,0.0005680644,0.58876145,0.012495407,0.30507088,0.008721854,0.078699075],"study_design_scores_gemma":[0.00022324729,0.0001959098,0.00019949925,0.00002555505,0.000024357885,0.00020067583,0.000068362126,0.9300345,0.001200184,0.06552197,0.0022672184,0.00003849582],"about_ca_topic_score_codex":0.0015935161,"about_ca_topic_score_gemma":0.0012844066,"teacher_disagreement_score":0.0058119614,"about_ca_system_score_codex":0.0017698599,"about_ca_system_score_gemma":0.002517926,"threshold_uncertainty_score":0.02586472},"labels":[],"label_agreement":null},{"id":"W2523970097","doi":"10.2139/ssrn.2826055","title":"An Analysis of Time-Based Pricing in Electricity Supply Chains","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada); University of Calgary","funders":"","keywords":"Supply chain; Electricity pricing; Electricity; Business; Electricity market; Economics; Industrial organization; Microeconomics; Engineering; Electrical engineering","score_opus":0.002942269662731336,"score_gpt":0.19117888281611384,"score_spread":0.1882366131533825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523970097","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47793826,0.0025994692,0.47662482,0.0026220977,0.0003140216,0.00017365594,0.0004701832,0.00023792521,0.03901949],"genre_scores_gemma":[0.98356134,0.000706884,0.0064071533,0.000050640687,0.00009288701,0.00002747301,0.00010816181,0.000049720824,0.008995735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989968,0.0003976469,0.000038760005,0.000109291395,0.00024133599,0.00021611917],"domain_scores_gemma":[0.9946865,0.003938124,0.00040418253,0.00019462778,0.00052130234,0.00025523728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002127281,0.00063838443,0.000859894,0.0010176367,0.00065115775,0.002790189,0.0018716931,0.0015532086,0.008573342],"category_scores_gemma":[0.011913617,0.00060106174,0.0012741345,0.0017157666,0.0011064812,0.0041900617,0.00091139897,0.0017150333,0.00029880792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009762641,0.00007508843,0.0019537,0.000077747914,0.00006633131,0.00017587424,0.000110061184,0.83965564,0.00085531315,0.14664948,0.0009185548,0.009364564],"study_design_scores_gemma":[0.000005109926,0.000021803065,0.0004426783,0.0000072335124,0.000020801794,0.000025360472,0.000033445795,0.9774916,0.00010115285,0.021476893,0.00036562677,0.000008411613],"about_ca_topic_score_codex":0.013145771,"about_ca_topic_score_gemma":0.007570883,"teacher_disagreement_score":0.013145771,"about_ca_system_score_codex":0.0021893012,"about_ca_system_score_gemma":0.0019300203,"threshold_uncertainty_score":0.028680742},"labels":[],"label_agreement":null},{"id":"W2526422986","doi":"10.1109/tsg.2015.2479557","title":"Optimal Residential Demand Response for Multiple Heterogeneous Homes With Real-Time Price Prediction in a Multiagent Framework","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Electricity; Payment; Computer science; Electricity market; Load management; Electric power system; Control (management); Peak demand; Energy management system; Electricity pricing; Operations research; Energy management; Mathematical optimization; Stability (learning theory); Power (physics); Energy (signal processing); Engineering","score_opus":0.013570590939498918,"score_gpt":0.22168122751775815,"score_spread":0.20811063657825923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2526422986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2605926,0.00020099971,0.7334642,0.00050129194,0.00004989584,0.00013656417,0.000071231065,0.00024540816,0.004737748],"genre_scores_gemma":[0.9845775,0.000036365767,0.014126868,0.000023818682,0.000010755884,0.000040658924,0.00002176577,0.000013319824,0.0011489083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992908,0.00030040208,0.000026249418,0.00014861666,0.000101721715,0.00013223662],"domain_scores_gemma":[0.99882275,0.00064334925,0.00021796847,0.000044129312,0.00017550992,0.00009618269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014666442,0.00081593805,0.0011594953,0.00037155277,0.00056746654,0.0013939774,0.0009908213,0.0010252027,0.0011345262],"category_scores_gemma":[0.0023704523,0.00059991766,0.0005574769,0.00031573747,0.00088582054,0.0009497314,0.00083763455,0.00084493984,0.00011529154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047304144,0.000029969835,0.00025542374,0.000009102027,0.000013625244,0.00003731891,0.000013655502,0.9960751,0.00036648495,0.0013147312,0.000086028005,0.001751293],"study_design_scores_gemma":[0.00000501921,0.000009502196,0.00003791216,3.0530984e-7,0.0000022401252,0.0000015383386,0.0000044680583,0.9996207,0.000058578837,0.00024028544,0.000018189205,0.000001263194],"about_ca_topic_score_codex":0.017345982,"about_ca_topic_score_gemma":0.011907143,"teacher_disagreement_score":0.017345982,"about_ca_system_score_codex":0.0016861109,"about_ca_system_score_gemma":0.0013867584,"threshold_uncertainty_score":0.03449005},"labels":[],"label_agreement":null},{"id":"W2527875214","doi":"10.1145/3003977.3003997","title":"An Emergency Demand Response Mechanism for Cloud Computing","year":2016,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cloud computing; Provisioning; Server; Computer science; Demand response; Data center; Resource (disambiguation); Distributed computing; Electricity; Database; Operating system; Computer network; Engineering","score_opus":0.053353420386521876,"score_gpt":0.3245248779711337,"score_spread":0.27117145758461186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527875214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07864034,0.0007317506,0.9032345,0.002025118,0.00025834757,0.000580356,0.00018297344,0.0007470212,0.013599577],"genre_scores_gemma":[0.9042815,0.00032705098,0.09048445,0.00029411618,0.00012801417,0.00021290524,0.00008421388,0.000049280916,0.0041384716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976417,0.0009968698,0.00009944649,0.00032354333,0.00050510134,0.0004334334],"domain_scores_gemma":[0.9969248,0.0015027933,0.00041693985,0.00054051826,0.00037839802,0.00023660176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029759451,0.0006077549,0.00078109367,0.00049130165,0.000841466,0.001767183,0.0026772958,0.0013883428,0.0024925177],"category_scores_gemma":[0.005599433,0.00036872283,0.000649532,0.00079142174,0.0013017892,0.0030186065,0.001709771,0.0015494677,0.00030171432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096575514,0.00090428966,0.0020419431,0.0006513342,0.00019241397,0.0006971142,0.00040072907,0.43035072,0.020804623,0.40066814,0.01197731,0.13034563],"study_design_scores_gemma":[0.00013529757,0.00023135748,0.00040133324,0.000028844559,0.000037732214,0.00042342854,0.000106307125,0.915087,0.0042361356,0.0708322,0.0084420135,0.00003837608],"about_ca_topic_score_codex":0.0012747148,"about_ca_topic_score_gemma":0.000825929,"teacher_disagreement_score":0.0029759451,"about_ca_system_score_codex":0.001728343,"about_ca_system_score_gemma":0.0017115208,"threshold_uncertainty_score":0.015738487},"labels":[],"label_agreement":null},{"id":"W2527878471","doi":"10.1109/sege.2016.7589542","title":"Power management strategy for sizing battery system for peak load limiting in a university campus","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Photovoltaic system; Sizing; Peaking power plant; Battery (electricity); Limit (mathematics); Automotive engineering; Grid-connected photovoltaic power system; Grid; Reliability engineering; Computer science; Electricity; Power (physics); Electric power system; Limiting; Electrical engineering; Engineering; Maximum power point tracking; Renewable energy; Distributed generation; Voltage; Inverter","score_opus":0.01105239511851086,"score_gpt":0.1859266282791893,"score_spread":0.17487423316067843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527878471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21382092,0.0005913986,0.7349208,0.00048546877,0.00005570034,0.00049456744,0.00016410038,0.0011827876,0.04828426],"genre_scores_gemma":[0.9653077,0.000105724874,0.031233203,0.000037428694,0.000011087943,0.000073630275,0.000032033942,0.000028557602,0.0031705971],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998479,0.000030084468,0.000009074449,0.000031075673,0.000047215188,0.000034713674],"domain_scores_gemma":[0.9998858,0.000026165268,0.00002178988,0.000007819157,0.000044327273,0.000014027622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002177563,0.000552302,0.000439704,0.000492183,0.00049846986,0.0010208032,0.0008401697,0.00045170143,0.004379907],"category_scores_gemma":[0.00041546745,0.00021466841,0.00021802846,0.00035646855,0.000223338,0.0006123643,0.0003864867,0.00029752697,0.00045172902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021770927,0.00018706423,0.002194369,0.0002018107,0.00004126,0.00028686668,0.00028011348,0.71815926,0.046290435,0.010808348,0.0036338437,0.21769887],"study_design_scores_gemma":[0.000038457176,0.00017048082,0.0013108802,0.000017304987,0.00004123815,0.00010484515,0.0002197415,0.9798663,0.010590657,0.003060597,0.0045592287,0.00002013885],"about_ca_topic_score_codex":0.0063137934,"about_ca_topic_score_gemma":0.014814491,"teacher_disagreement_score":0.0063137934,"about_ca_system_score_codex":0.001133907,"about_ca_system_score_gemma":0.0010836135,"threshold_uncertainty_score":0.014652193},"labels":[],"label_agreement":null},{"id":"W2529078127","doi":"10.1016/j.enbuild.2016.09.070","title":"Adaptive residential demand-side management using rule-based techniques in smart grid environments","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; HVAC; Smart grid; Demand side; Energy management; Demand response; Computer science; Real-time computing; Preference; Building automation; Wireless; Grid; Energy (signal processing); Home automation; Energy management system; Air conditioning; Engineering; Telecommunications; Electrical engineering","score_opus":0.007251424155195455,"score_gpt":0.18837365192553066,"score_spread":0.1811222277703352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2529078127","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15514952,0.0003904135,0.83699137,0.0002485831,0.00013330029,0.00008811048,0.00009925488,0.0013540108,0.005545356],"genre_scores_gemma":[0.9517182,0.000105706364,0.047129616,0.0000530542,0.000027134749,0.000025792444,0.00006434759,0.00003224077,0.0008438359],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992694,0.00019304948,0.00006391054,0.00016104587,0.00022898163,0.00008358208],"domain_scores_gemma":[0.9982304,0.0010072369,0.00016277745,0.0002386113,0.00029928677,0.00006168444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010876543,0.00039283623,0.001049541,0.00035249238,0.00038002653,0.0014016792,0.0011406542,0.0005424434,0.00085772783],"category_scores_gemma":[0.0024633314,0.00030511437,0.00033466026,0.0004983313,0.0004415174,0.0011166959,0.00045235895,0.0008171779,0.00028115883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003782021,0.00046340545,0.003505803,0.00007498439,0.00012388412,0.00027882008,0.00015060435,0.7759668,0.007685074,0.004482889,0.0015119424,0.20537755],"study_design_scores_gemma":[0.0000101353735,0.000024382645,0.00031088764,0.0000028057418,0.000011749807,0.000028486418,0.000015115553,0.99661875,0.0009838975,0.0017305476,0.00025780103,0.0000054144166],"about_ca_topic_score_codex":0.0036919618,"about_ca_topic_score_gemma":0.0067021167,"teacher_disagreement_score":0.0036919618,"about_ca_system_score_codex":0.0003507327,"about_ca_system_score_gemma":0.00037928004,"threshold_uncertainty_score":0.0073409677},"labels":[],"label_agreement":null},{"id":"W2530261731","doi":"10.1016/b978-0-12-805343-0.00002-4","title":"Smart energy grid infrastructures and interconnected micro energy grids","year":2016,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Renewable energy; Smart grid; Energy supply; Distributed generation; Electricity; Environmental economics; Engineering; Grid; Energy engineering; Reliability (semiconductor); Energy (signal processing); Computer science; Power (physics); Electrical engineering","score_opus":0.004663349259383663,"score_gpt":0.1692184986572076,"score_spread":0.16455514939782392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2530261731","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014480159,0.040193483,0.016528964,0.0028113185,0.0024164265,0.000029426981,0.00016375764,0.00029015733,0.9361184],"genre_scores_gemma":[0.0149840955,0.046110872,0.0059831585,0.0006702471,0.0009406929,0.00004095527,0.000237506,0.00015743314,0.930875],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998808,0.000015925354,0.0000050853096,0.000020461028,0.00006710857,0.000010597724],"domain_scores_gemma":[0.9999291,0.000027203536,0.000005480686,0.000013036798,0.00001733587,0.0000078829735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012671166,0.0008566289,0.00036470583,0.0008305134,0.00042780695,0.0023015998,0.00046460037,0.0009338818,0.04412951],"category_scores_gemma":[0.00028592328,0.00032271698,0.00023407914,0.0020974812,0.00058724376,0.0029307045,0.001069189,0.0013174308,0.013663486],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012863502,0.000042201256,0.00012986909,0.00031942746,0.000007819576,0.00010506752,0.00023489352,0.0032755993,0.0010798221,0.32035708,0.24170655,0.4327288],"study_design_scores_gemma":[0.0000019287106,0.0000067037045,0.00014019324,0.00015976022,0.0000028144048,0.00009226816,0.00007926495,0.0011341502,0.00019290383,0.07188767,0.9262984,0.0000039569436],"about_ca_topic_score_codex":0.001448263,"about_ca_topic_score_gemma":0.0034854328,"teacher_disagreement_score":0.04412951,"about_ca_system_score_codex":0.0007662884,"about_ca_system_score_gemma":0.00065558165,"threshold_uncertainty_score":0.14762795},"labels":[],"label_agreement":null},{"id":"W2531947827","doi":"10.1109/isgt-mideast.2011.6220825","title":"Time averaging and threshold effect on statistics of residential power consumption","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Metering mode; Electricity; Computer science; Net metering; Consumption (sociology); Interval (graph theory); Power (physics); Demand response; Energy consumption; Interval data; Real-time computing; Reliability engineering; Statistics; Environmental economics; Simulation; Engineering; Measure (data warehouse); Data mining; Electrical engineering; Mathematics; Economics; Renewable energy","score_opus":0.010349337800571533,"score_gpt":0.1959242931306617,"score_spread":0.18557495533009016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531947827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66304266,0.00081513444,0.32707897,0.00032726608,0.00017400106,0.00006446427,0.00035416824,0.0017138524,0.006429577],"genre_scores_gemma":[0.9771045,0.00017383734,0.02177546,0.000049938597,0.000050678787,0.000025286972,0.000283928,0.000103383245,0.00043297443],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99626285,0.0013111453,0.0002183892,0.0007036723,0.0011669651,0.00033697506],"domain_scores_gemma":[0.9542619,0.037814166,0.0014625469,0.0044986033,0.0016720023,0.0002908163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063227024,0.00024671224,0.00048393782,0.0010212021,0.00034709062,0.00084443955,0.00055673247,0.00048792662,0.0010984517],"category_scores_gemma":[0.052351233,0.00016899532,0.0004986754,0.0016778694,0.0008647265,0.0016046835,0.0005299147,0.0005824069,0.00020523024],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029759582,0.00027020744,0.15904178,0.00046772466,0.00041822423,0.0012878381,0.0021386764,0.26624843,0.040333506,0.04611291,0.0039093355,0.47679543],"study_design_scores_gemma":[0.000047198428,0.000537235,0.14649694,0.00005397668,0.00023665432,0.0010227088,0.00040912663,0.7942357,0.032581642,0.021324918,0.0029398631,0.000114012604],"about_ca_topic_score_codex":0.0025424664,"about_ca_topic_score_gemma":0.0020670975,"teacher_disagreement_score":0.0063227024,"about_ca_system_score_codex":0.00067625265,"about_ca_system_score_gemma":0.00058668485,"threshold_uncertainty_score":0.033438027},"labels":[],"label_agreement":null},{"id":"W2536097994","doi":"10.1109/iccchina.2016.7636905","title":"Dynamic elastic load scheduling achieving load balancing for smart grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Computer science; Dynamic demand; Load balancing (electrical power); Demand response; Scheduling (production processes); Distributed computing; Grid; Load management; Dynamic load testing; Power (physics); Electricity; Reliability engineering; Mathematical optimization; Engineering","score_opus":0.00607406667073331,"score_gpt":0.20109512312035435,"score_spread":0.19502105644962103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2536097994","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037412822,0.00012343393,0.9581095,0.00011852211,0.000040188825,0.00003125107,0.000027081887,0.00037378797,0.003763428],"genre_scores_gemma":[0.92970693,0.00010312942,0.068485625,0.000046995698,0.000039912506,0.000032343378,0.000047943493,0.000046737445,0.0014904574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997656,0.000055560795,0.000011118095,0.00005045897,0.000068067755,0.00004921794],"domain_scores_gemma":[0.99980646,0.00006655993,0.00004062167,0.000036345096,0.000031740416,0.000018286131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028346578,0.00043988402,0.00044824101,0.00025406433,0.00040743328,0.0005642136,0.0004898758,0.00029791074,0.0015358829],"category_scores_gemma":[0.00058902096,0.00016990691,0.00018082937,0.00045154945,0.0003473925,0.000946731,0.00059686473,0.00038578876,0.00029319333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002101936,0.00014691366,0.00063088787,0.000059935,0.00001637435,0.00008140849,0.000098818164,0.79165685,0.02348218,0.026723301,0.0027206624,0.15417251],"study_design_scores_gemma":[0.0000054685106,0.000018887433,0.00007191846,0.0000011935438,0.0000015709873,0.000012836786,0.000011259888,0.99266136,0.0016742614,0.004909181,0.0006279348,0.0000041605726],"about_ca_topic_score_codex":0.0013657738,"about_ca_topic_score_gemma":0.0021538474,"teacher_disagreement_score":0.0015358829,"about_ca_system_score_codex":0.0004301854,"about_ca_system_score_gemma":0.00055416476,"threshold_uncertainty_score":0.005138099},"labels":[],"label_agreement":null},{"id":"W2541156125","doi":"10.1109/sge.2012.6463961","title":"Simulation analysis for the design of high performance smart meter","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Key (lock); Smart meter; Metering mode; Computer science; Electricity; Power consumption; Performance indicator; Scheduling (production processes); Modularity (biology); Smart grid; Engineering; Power (physics); Computer security; Electrical engineering","score_opus":0.03066878932969239,"score_gpt":0.22345629171129555,"score_spread":0.19278750238160317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2541156125","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04934071,0.00039450577,0.91706336,0.0004480101,0.00008267265,0.00021999874,0.00026540708,0.00071576313,0.03146958],"genre_scores_gemma":[0.9092253,0.00051789166,0.079368114,0.0001061454,0.000031571748,0.00057624106,0.00034708774,0.00012992612,0.009697712],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996735,0.0001336331,0.0000138685755,0.000031163436,0.00009592773,0.000051989333],"domain_scores_gemma":[0.99920636,0.0004928209,0.00006941288,0.000033364875,0.00016827299,0.000029749632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007218276,0.0007195919,0.0008146491,0.0004685857,0.00057067897,0.00084241066,0.00072995323,0.00088803546,0.0073506576],"category_scores_gemma":[0.0021176564,0.00041839704,0.00077262544,0.00041811474,0.00039607155,0.0006739968,0.0005149289,0.00074250717,0.0006065854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017767792,0.000008454688,0.00020967318,0.000016396973,0.000004940709,0.000016331627,0.0000117339205,0.9948489,0.00034563313,0.00305736,0.00013842635,0.0013243464],"study_design_scores_gemma":[0.000004271314,0.000007361611,0.000031084208,0.0000027573233,0.0000022298498,0.000002062809,0.000002821075,0.9990928,0.00012184103,0.00043587663,0.0002956033,0.0000013116639],"about_ca_topic_score_codex":0.010959691,"about_ca_topic_score_gemma":0.0066442057,"teacher_disagreement_score":0.010959691,"about_ca_system_score_codex":0.0011149824,"about_ca_system_score_gemma":0.0014164838,"threshold_uncertainty_score":0.024590373},"labels":[],"label_agreement":null},{"id":"W2546974086","doi":"10.1109/ccece.2016.7726766","title":"Optimization of domestic energy consumption","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Optimization problem; Energy consumption; Mathematical optimization; Energy (signal processing); Simple (philosophy); Energy minimization; Optimization algorithm; Solar energy; Algorithm; Engineering; Mathematics","score_opus":0.007590911718702231,"score_gpt":0.18978622815419674,"score_spread":0.1821953164354945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2546974086","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09905099,0.0012624293,0.7446665,0.00086804345,0.0001507641,0.000120433586,0.0008794374,0.00067616836,0.1523252],"genre_scores_gemma":[0.92058134,0.0008639746,0.052911602,0.00012029645,0.00004415455,0.00014990752,0.00042288902,0.00032194133,0.02458381],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945873,0.00023476494,0.000016014808,0.00012029276,0.0000911846,0.00007915813],"domain_scores_gemma":[0.9998375,0.000069842376,0.0000151605245,0.00002640109,0.00003825689,0.000012782511],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005410639,0.00072494766,0.0010476694,0.0003446616,0.0003323713,0.0012847774,0.0005898907,0.0008293604,0.006302372],"category_scores_gemma":[0.001191247,0.00033569735,0.000534091,0.0008395087,0.00047126444,0.00085251837,0.0007073329,0.00045071196,0.0010573419],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069781265,0.000044031392,0.00042741577,0.00011951614,0.00003535479,0.000057145422,0.000053473665,0.92363214,0.0022910212,0.03349427,0.0034937346,0.036282152],"study_design_scores_gemma":[0.000011927634,0.00007791179,0.000644727,0.000020736145,0.00002104418,0.00005215881,0.00007741282,0.9685422,0.0020786556,0.018902263,0.009558379,0.000012578559],"about_ca_topic_score_codex":0.0018568557,"about_ca_topic_score_gemma":0.0015943402,"teacher_disagreement_score":0.006302372,"about_ca_system_score_codex":0.0011928055,"about_ca_system_score_gemma":0.0006579295,"threshold_uncertainty_score":0.021083593},"labels":[],"label_agreement":null},{"id":"W2547101057","doi":"10.1109/ccece.2016.7726794","title":"Wireless sensor networks with pressure-based energy forecasting: A simulation study","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wireless sensor network; Computer science; Reliability (semiconductor); Real-time computing; Energy management; Software deployment; Wireless; Wireless network; Energy (signal processing); Node (physics); Reliability engineering; Power (physics); Computer network; Engineering; Telecommunications","score_opus":0.014314182002174682,"score_gpt":0.1897715170090266,"score_spread":0.17545733500685193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547101057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94460326,0.0006190559,0.03838846,0.0009894905,0.00009768453,0.00014277846,0.00060754706,0.0001571654,0.0143945785],"genre_scores_gemma":[0.9947366,0.00031765577,0.003533218,0.00003799364,0.00001314896,0.00006469355,0.00013521242,0.000008114231,0.0011533088],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972373,0.00011737201,0.000015215561,0.000033416934,0.000046341753,0.000063870364],"domain_scores_gemma":[0.99739504,0.0019329556,0.00021692477,0.00009594561,0.0002614709,0.000097723634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008402926,0.00057302945,0.00063606235,0.0005979178,0.00049738627,0.00064827007,0.00080918474,0.001363626,0.0017191187],"category_scores_gemma":[0.002572808,0.00024856356,0.00072685286,0.00082047796,0.0006160306,0.001123794,0.0006091032,0.00093532604,0.00012363508],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038501355,0.00006114309,0.0015726067,0.000020444366,0.000014349279,0.000056836776,0.000018834897,0.9958884,0.00019662063,0.0010606222,0.0001310733,0.0009405189],"study_design_scores_gemma":[0.000008517736,0.00003666804,0.00025234418,0.0000028482561,0.000005456963,0.000007056934,0.000018446186,0.99927264,0.000101022175,0.00020979505,0.000082459126,0.0000027631925],"about_ca_topic_score_codex":0.0181953,"about_ca_topic_score_gemma":0.011804891,"teacher_disagreement_score":0.0181953,"about_ca_system_score_codex":0.0008571371,"about_ca_system_score_gemma":0.00061954925,"threshold_uncertainty_score":0.036178768},"labels":[],"label_agreement":null},{"id":"W2547310136","doi":"10.1109/ias.2016.7731970","title":"Load aggregation from generation-follows-load to load-follows-generation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Computer science; Load balancing (electrical power); Demand response; Load management; Electric power system; Grid; Load profile; Distributed computing; Electricity generation; Power (physics); Control engineering; Electrical engineering; Electricity; Engineering","score_opus":0.017199119279240855,"score_gpt":0.20528920766266276,"score_spread":0.1880900883834219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547310136","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037965804,0.0004181513,0.9285489,0.00049126946,0.0003695275,0.00031642872,0.0003980368,0.004592334,0.026899522],"genre_scores_gemma":[0.74425465,0.00066202343,0.23738639,0.0003549309,0.0004163178,0.00020665042,0.000887563,0.0006682735,0.015163202],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991716,0.00019765359,0.0000497896,0.00021017253,0.00028739453,0.0000834137],"domain_scores_gemma":[0.9990687,0.0001623615,0.00012429708,0.00040569188,0.00019453691,0.000044470253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058124954,0.000646866,0.00062951946,0.00069556583,0.0008689277,0.001701627,0.0007628887,0.00035990062,0.004230434],"category_scores_gemma":[0.0014896359,0.0002844691,0.00056143565,0.0011744938,0.0006263894,0.0019586997,0.0013058101,0.00092292693,0.0016287016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007073815,0.00037279818,0.006804746,0.0003188808,0.00019416638,0.00080362736,0.0010761037,0.23493397,0.041237257,0.13806021,0.028778687,0.54671216],"study_design_scores_gemma":[0.000052497122,0.00023070842,0.00567655,0.000063044026,0.00011210125,0.00044933264,0.0003266931,0.7994085,0.038786836,0.09920813,0.055579323,0.00010631068],"about_ca_topic_score_codex":0.0027169099,"about_ca_topic_score_gemma":0.0036106366,"teacher_disagreement_score":0.004230434,"about_ca_system_score_codex":0.0007278375,"about_ca_system_score_gemma":0.0006332823,"threshold_uncertainty_score":0.014152229},"labels":[],"label_agreement":null},{"id":"W2547715551","doi":"10.1109/ccece.2016.7726787","title":"Investigating the switch continuity principle assumed in Non-Intrusive Load Monitoring (NILM)","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Sampling (signal processing); Point (geometry); State (computer science); Data mining; Real-time computing; Algorithm; Mathematics; Telecommunications","score_opus":0.010923324245842754,"score_gpt":0.2286304771337519,"score_spread":0.21770715288790915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547715551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7340432,0.0026162304,0.2484898,0.0038842633,0.0002768765,0.00035462098,0.0021523274,0.0006529221,0.0075298413],"genre_scores_gemma":[0.9625414,0.00040339664,0.034378894,0.00030194622,0.00011217416,0.00011037726,0.0017577591,0.000046301684,0.0003477306],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98969895,0.004240728,0.0008141533,0.002916332,0.0018540181,0.00047569754],"domain_scores_gemma":[0.9198176,0.061036147,0.0067974413,0.008374729,0.0033807664,0.00059323973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020725496,0.0007032871,0.0009823022,0.00095673685,0.001311709,0.0032889377,0.0023613742,0.0025071704,0.0010153697],"category_scores_gemma":[0.087256506,0.00056881655,0.0006624761,0.001971192,0.0028028388,0.008344344,0.0023608285,0.0030735647,0.00035563554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037178537,0.0013343395,0.40426746,0.0022206365,0.0008740586,0.001802972,0.0032111811,0.29460037,0.011511606,0.058830205,0.012199648,0.20542973],"study_design_scores_gemma":[0.00021880321,0.0011054552,0.10358416,0.00027883486,0.0001924143,0.0013953375,0.0018522257,0.8331537,0.007285822,0.04455355,0.0062441397,0.00013554844],"about_ca_topic_score_codex":0.0054274634,"about_ca_topic_score_gemma":0.0047834236,"teacher_disagreement_score":0.020725496,"about_ca_system_score_codex":0.0016087283,"about_ca_system_score_gemma":0.0013712145,"threshold_uncertainty_score":0.10960823},"labels":[],"label_agreement":null},{"id":"W2547978431","doi":"10.1109/ccece.2016.7726749","title":"Baseline load forecasting using a Bayesian approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Baseline (sea); Computer science; Flexibility (engineering); Bidding; Procurement; Bayesian probability; Scheduling (production processes); Demand response; Key (lock); Operations research; Machine learning; Artificial intelligence; Electricity; Engineering; Operations management","score_opus":0.03011486249896716,"score_gpt":0.1999349660073043,"score_spread":0.16982010350833712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547978431","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02508147,0.00017357791,0.97095597,0.00019895947,0.000018089215,0.00004040912,0.00020398031,0.0005348014,0.0027928133],"genre_scores_gemma":[0.8005802,0.00044634927,0.1939548,0.00010335416,0.00006640106,0.000145944,0.0008562799,0.00009623264,0.003750478],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992054,0.00025895177,0.000039694118,0.0001455722,0.0002739678,0.000076451004],"domain_scores_gemma":[0.99913126,0.0004518418,0.00010398528,0.00005671851,0.00021966979,0.000036539077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001289703,0.0005627772,0.0010610087,0.0012430423,0.00041730265,0.0010952882,0.0013339911,0.0009844811,0.002229271],"category_scores_gemma":[0.003950588,0.0007100594,0.0006040418,0.0010469446,0.00033465135,0.0023693058,0.0005980625,0.0009971401,0.00079564046],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006657034,0.00004761063,0.0011593726,0.000022583203,0.000023991506,0.00004191146,0.0000370536,0.933493,0.0008563716,0.009042496,0.0011191092,0.0540899],"study_design_scores_gemma":[0.000003118568,0.0000058055525,0.0001789467,0.0000023501827,0.0000026038476,0.000006179342,0.000003520611,0.9967554,0.00006444785,0.0027777608,0.0001939431,0.000005949295],"about_ca_topic_score_codex":0.019339332,"about_ca_topic_score_gemma":0.025035948,"teacher_disagreement_score":0.019339332,"about_ca_system_score_codex":0.0010643532,"about_ca_system_score_gemma":0.0011496022,"threshold_uncertainty_score":0.03845352},"labels":[],"label_agreement":null},{"id":"W2548001738","doi":"10.1109/ccece.2016.7726733","title":"Novel method for power flow optimization in commercial buildings","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada); Powertech Labs (Canada)","funders":"","keywords":"Power flow; Computer science; Flow (mathematics); Power (physics); Electric power system; Mechanics; Physics","score_opus":0.01192689622632755,"score_gpt":0.2387796088131815,"score_spread":0.22685271258685394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548001738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0072697666,0.00015085438,0.9842672,0.00007051138,0.00003984816,0.000056636465,0.00003438961,0.00026499084,0.007845853],"genre_scores_gemma":[0.47926342,0.00041244293,0.5060876,0.00007629802,0.00009013497,0.00031515028,0.0001637556,0.00019983076,0.013391396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997973,0.00005377076,0.000008655011,0.000041962743,0.0000795629,0.000018670413],"domain_scores_gemma":[0.99985325,0.00007089114,0.000013691411,0.000013611708,0.000041598712,0.0000069373705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043118367,0.00062670466,0.0005803314,0.00045330237,0.00037306777,0.0007159065,0.0007946399,0.00057234307,0.0052303127],"category_scores_gemma":[0.0006055702,0.0003412721,0.0005291621,0.00053315796,0.00035944456,0.0006670458,0.00053212047,0.00059018703,0.0006529808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010314042,0.00012346059,0.00066522293,0.00017842493,0.0000412033,0.00010344678,0.00011456282,0.78381795,0.010417996,0.026255922,0.0027150635,0.17546356],"study_design_scores_gemma":[0.000006223731,0.000015976237,0.000054495482,0.0000040773425,0.0000025826544,0.000013478715,0.000007603899,0.9959311,0.000664116,0.0017296117,0.0015683298,0.0000024610272],"about_ca_topic_score_codex":0.0028118826,"about_ca_topic_score_gemma":0.0034114947,"teacher_disagreement_score":0.0052303127,"about_ca_system_score_codex":0.00050759275,"about_ca_system_score_gemma":0.000547269,"threshold_uncertainty_score":0.017497122},"labels":[],"label_agreement":null},{"id":"W2548258090","doi":"10.1109/ccece.2016.7726670","title":"Simulation-based investigation of optimal demand-side primary frequency regulation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Automatic frequency control; Phasor; Demand side; Governor; Control theory (sociology); Computer science; Power (physics); Electric power system; Turbine; Frequency deviation; Engineering; Control (management); Telecommunications; Economics","score_opus":0.01054643790507722,"score_gpt":0.19472763975824886,"score_spread":0.18418120185317163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548258090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9504208,0.00013772812,0.020154687,0.0002611219,0.00002946524,0.00010656394,0.0009958247,0.0005395816,0.027354252],"genre_scores_gemma":[0.9968177,0.000025137339,0.0022042939,0.000014061945,0.0000019558495,0.00002024949,0.00015727222,0.000016404669,0.0007430827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997825,0.0000804582,0.0000064430405,0.000020130805,0.000052736697,0.00005783725],"domain_scores_gemma":[0.99836737,0.0010743694,0.00010218829,0.00007481461,0.0003216373,0.000059540565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058020424,0.0005215085,0.0006847689,0.00047660942,0.00031890732,0.00057887856,0.0007408999,0.00059709855,0.004120396],"category_scores_gemma":[0.0020195462,0.000262813,0.0003370317,0.00044671845,0.0004355349,0.00026642453,0.0002674943,0.00058027916,0.00015856407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008327835,0.000050307422,0.0009342922,0.000034554956,0.000011848907,0.000040653413,0.000022108316,0.9958014,0.0006539691,0.00060436345,0.00030223312,0.0014610825],"study_design_scores_gemma":[0.000013470568,0.00002316206,0.0004268541,0.0000021828796,0.000004017871,0.0000031407453,0.0000117104555,0.999017,0.00032973228,0.00006036572,0.000106129184,0.00000226356],"about_ca_topic_score_codex":0.14281522,"about_ca_topic_score_gemma":0.10417529,"teacher_disagreement_score":0.14281522,"about_ca_system_score_codex":0.0014847323,"about_ca_system_score_gemma":0.0012551515,"threshold_uncertainty_score":0.2839679},"labels":[],"label_agreement":null},{"id":"W2548260028","doi":"10.1016/j.enbuild.2016.10.048","title":"A method for distinguishing appliance, lighting and plug load profiles from electricity ‘smart meter’ datasets","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Dalhousie University","funders":"National Research Council Canada","keywords":"Electricity; Smart meter; Electricity meter; Metering mode; Metre; Representativeness heuristic; Occupancy; Computer science; Electricity demand; Automotive engineering; Architectural engineering; Engineering; Environmental science; Electricity generation; Electrical engineering; Mechanical engineering; Statistics","score_opus":0.007953093046986503,"score_gpt":0.21994242225767108,"score_spread":0.21198932921068459,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548260028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1835869,0.0012883683,0.66831297,0.0013319683,0.0005882188,0.0019146608,0.11627336,0.019186456,0.007517176],"genre_scores_gemma":[0.20840192,0.00024891685,0.5737726,0.0003386099,0.00020957003,0.0012678124,0.21211478,0.00048089877,0.0031648662],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9952931,0.00069844624,0.0006140957,0.0015481503,0.0014909594,0.00035529523],"domain_scores_gemma":[0.9939383,0.0020264504,0.0006138604,0.0013512719,0.0018588265,0.0002112465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004082296,0.0012385206,0.0009712975,0.005871108,0.0008582175,0.0022203794,0.002217669,0.0018487287,0.0016236054],"category_scores_gemma":[0.013033488,0.00042716454,0.0018386083,0.0052136076,0.00038641447,0.0021289263,0.002098673,0.002052366,0.002614189],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011913261,0.0015325608,0.13048925,0.00068596954,0.001002163,0.0005958076,0.0007160377,0.027056253,0.016859693,0.0076629873,0.08198454,0.7302235],"study_design_scores_gemma":[0.00033780432,0.00040113836,0.10426635,0.00021688719,0.0002632994,0.000993445,0.0011723872,0.7546001,0.02027391,0.012981654,0.10424449,0.0002485161],"about_ca_topic_score_codex":0.012330518,"about_ca_topic_score_gemma":0.02277898,"teacher_disagreement_score":0.012330518,"about_ca_system_score_codex":0.0009037606,"about_ca_system_score_gemma":0.0021484003,"threshold_uncertainty_score":0.024517536},"labels":[],"label_agreement":null},{"id":"W2548710806","doi":"10.1049/cp.2014.1511","title":"Review on issues related to electric energy demand in distribution system for developing countries","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distribution (mathematics); Computer science; Energy (signal processing); Physics","score_opus":0.00619153746688337,"score_gpt":0.21746084676671742,"score_spread":0.21126930929983406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548710806","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007871476,0.9928872,0.00038437106,0.0008557576,0.00052049663,0.000008928929,0.0000917493,0.000008384178,0.004456026],"genre_scores_gemma":[0.0035680688,0.994484,0.00031327025,0.00026154798,0.00030288147,0.0000052857827,0.00009486734,0.0000030434596,0.00096690335],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960464,0.00009213488,0.000084122,0.00004882222,0.00014747972,0.000022824279],"domain_scores_gemma":[0.99794143,0.0011083605,0.00025209307,0.000027306663,0.00063373323,0.000037118716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006887988,0.0004854269,0.00078143686,0.0022884095,0.00026450478,0.0012012698,0.00054793817,0.00063859497,0.004553861],"category_scores_gemma":[0.0018543034,0.0002694866,0.00046263338,0.005074747,0.00023138706,0.0013614654,0.0002817637,0.0005597179,0.0009711694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009810169,0.000056383065,0.0015582931,0.057708483,0.00014591844,0.0005946167,0.00044218556,0.0013765896,0.0015179451,0.0061364546,0.0819416,0.8484233],"study_design_scores_gemma":[0.0000048465286,0.00008481747,0.004062619,0.015641857,0.00017144273,0.0009904869,0.00046828063,0.00018309553,0.0005105038,0.0012619629,0.97659814,0.000021997786],"about_ca_topic_score_codex":0.0036386135,"about_ca_topic_score_gemma":0.006163919,"teacher_disagreement_score":0.004553861,"about_ca_system_score_codex":0.0007224256,"about_ca_system_score_gemma":0.002005324,"threshold_uncertainty_score":0.015234172},"labels":[],"label_agreement":null},{"id":"W2549946723","doi":"10.1109/epec.2010.5697213","title":"The impact of smart grid residential energy management schemes on the carbon footprint of the household electricity consumption","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Carbon footprint; Smart grid; Greenhouse gas; Environmental economics; Electricity; Consumption (sociology); Energy consumption; Renewable energy; Energy management; Computer science; Business; Environmental science; Energy (signal processing); Economics; Engineering; Electrical engineering","score_opus":0.010452104902763352,"score_gpt":0.20510994931551724,"score_spread":0.19465784441275388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2549946723","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9812439,0.000363943,0.005560776,0.00022009198,0.000022369923,0.000034106968,0.00016608663,0.00004469965,0.012343988],"genre_scores_gemma":[0.998953,0.00007426618,0.0006434825,0.0000151520835,0.0000033826313,0.000006109688,0.000033448505,0.0000029520018,0.00026832978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938214,0.0002592239,0.00001717502,0.000059527127,0.00018411431,0.0000979032],"domain_scores_gemma":[0.997341,0.001548196,0.00035189895,0.0002413589,0.0004405143,0.00007701099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070648134,0.00029987952,0.0002657497,0.00030983798,0.00024567355,0.0004972308,0.00029264568,0.00046040377,0.0015128015],"category_scores_gemma":[0.0030376937,0.00007923092,0.00014778292,0.0007758337,0.00043902273,0.0007465695,0.00029698966,0.00020954896,0.00013111203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030572366,0.0012470288,0.07845634,0.000302419,0.00029011755,0.0005181114,0.00017047749,0.69348305,0.03899458,0.03643762,0.0018621422,0.14518079],"study_design_scores_gemma":[0.00019591568,0.0018008427,0.16225806,0.000058572703,0.00025210157,0.00038776215,0.0007735326,0.7466415,0.059220407,0.022348763,0.0059793717,0.00008312944],"about_ca_topic_score_codex":0.0023380127,"about_ca_topic_score_gemma":0.0025469773,"teacher_disagreement_score":0.0023380127,"about_ca_system_score_codex":0.0008265182,"about_ca_system_score_gemma":0.00034139137,"threshold_uncertainty_score":0.005996883},"labels":[],"label_agreement":null},{"id":"W2551434836","doi":"10.1109/pesgm.2016.7741490","title":"Power consumption modeling of water pumping system for optimal energy management","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy consumption; Schedule; Reliability (semiconductor); Rotational speed; Automotive engineering; Energy management; Power (physics); Computer science; Reliability engineering; Energy (signal processing); Control theory (sociology); Simulation; Engineering; Control (management); Electrical engineering; Mechanical engineering","score_opus":0.011774552573784788,"score_gpt":0.18988013803933299,"score_spread":0.1781055854655482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2551434836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11906286,0.00031131,0.84410185,0.00044043068,0.000055621927,0.0001082501,0.0005586223,0.00085824763,0.03450278],"genre_scores_gemma":[0.9722605,0.0002560153,0.017627276,0.000035709378,0.000013897457,0.00011530933,0.00021280191,0.00006884896,0.009409673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990034,0.000024062549,0.000004822617,0.0000238005,0.00003471576,0.000012325747],"domain_scores_gemma":[0.9999323,0.00003063037,0.000009810008,0.0000060316447,0.000018141613,0.0000031926404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014809413,0.0004986858,0.00040951182,0.00020373288,0.0003134846,0.0005859276,0.0005310354,0.00045451257,0.003206483],"category_scores_gemma":[0.00036507176,0.00031575884,0.0003743871,0.00028722818,0.00019032128,0.0007889637,0.00023745613,0.00046196967,0.00040958484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012388885,0.000008721359,0.00021504216,0.000014545659,0.00000458283,0.000020272295,0.000009609813,0.9931344,0.0010564496,0.0012734255,0.00024618194,0.004004322],"study_design_scores_gemma":[8.647251e-7,0.000002915988,0.00005932783,7.3778574e-7,8.1961076e-7,0.0000018083192,0.0000014667613,0.9994198,0.0001428613,0.00019232523,0.00017625494,7.796131e-7],"about_ca_topic_score_codex":0.011139616,"about_ca_topic_score_gemma":0.0097356215,"teacher_disagreement_score":0.011139616,"about_ca_system_score_codex":0.0006171589,"about_ca_system_score_gemma":0.00070942595,"threshold_uncertainty_score":0.022149563},"labels":[],"label_agreement":null},{"id":"W2553242301","doi":"10.1109/ijcnn.2016.7727545","title":"Whole-house Non-Intrusive Appliance Load Monitoring via multi-label classification","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Classifier (UML); Power consumption; Machine learning; Field (mathematics); Multi-label classification; Energy consumption; Artificial intelligence; Power (physics); Data mining; Engineering","score_opus":0.026254386818977668,"score_gpt":0.23892714347750618,"score_spread":0.21267275665852853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553242301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6744124,0.002077793,0.27107123,0.0011009715,0.0008404883,0.0012527474,0.015195011,0.019072773,0.014976633],"genre_scores_gemma":[0.73488486,0.00040566598,0.22251537,0.00030879257,0.0001749488,0.00051053206,0.029195918,0.00020388736,0.011800079],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985057,0.0003552492,0.00010852886,0.00046305425,0.0004147292,0.00015280319],"domain_scores_gemma":[0.9978376,0.0006196375,0.0002660344,0.00061028556,0.00057759346,0.00008892012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015965011,0.0014045995,0.0009391396,0.0017124873,0.00060165126,0.0010001751,0.0019114418,0.001135132,0.0019684143],"category_scores_gemma":[0.0031729285,0.00019076515,0.000577884,0.001865037,0.00029068056,0.0016766621,0.0009991585,0.0010326175,0.0018769534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013988585,0.0024390302,0.04598562,0.00055526366,0.00032278744,0.00038575867,0.00030427155,0.033455867,0.0141187785,0.0016891868,0.04894084,0.85040385],"study_design_scores_gemma":[0.00011161403,0.0004087826,0.03011749,0.000053365584,0.00008287445,0.00045040465,0.00043347824,0.91749597,0.027781758,0.0029917886,0.02000569,0.00006687316],"about_ca_topic_score_codex":0.004941574,"about_ca_topic_score_gemma":0.012491276,"teacher_disagreement_score":0.004941574,"about_ca_system_score_codex":0.00077618985,"about_ca_system_score_gemma":0.0005456476,"threshold_uncertainty_score":0.009825647},"labels":[],"label_agreement":null},{"id":"W2553616530","doi":"10.1109/pesgm.2016.7741818","title":"Descriptive models for hourly reserve prices in electricity market","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Electricity market; Electricity; Calibration; Econometrics; Market price; Economics; Environmental economics; Natural resource economics; Microeconomics; Electrical engineering; Statistics; Engineering; Mathematics","score_opus":0.02122132792550277,"score_gpt":0.20076745840492444,"score_spread":0.17954613047942167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553616530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3690656,0.00078762876,0.6028956,0.0013258326,0.00010926349,0.00021116981,0.0057855644,0.0007953721,0.019023938],"genre_scores_gemma":[0.9713482,0.00054070307,0.010318487,0.00008572116,0.00006873341,0.00018992696,0.0022365113,0.00010723621,0.015104417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993799,0.00021066547,0.00003956932,0.00014379215,0.00013305538,0.000093015005],"domain_scores_gemma":[0.995276,0.0032473146,0.000806616,0.00022149534,0.00035918757,0.00008938371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024259123,0.000720813,0.00082324335,0.0010384728,0.00037182402,0.0019703177,0.0025727297,0.0014054425,0.0051204246],"category_scores_gemma":[0.008878837,0.00064346753,0.0010493696,0.0011870967,0.00087731227,0.0021739728,0.00053416385,0.0015011121,0.00081747543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047223737,0.000036410154,0.0018057508,0.000028909082,0.000026920543,0.00010197195,0.00011996248,0.90880686,0.000348243,0.08468171,0.0012417377,0.0027544547],"study_design_scores_gemma":[0.0000043945765,0.0000071323802,0.0004756946,0.0000025813276,0.0000040339282,0.000013074292,0.000011113863,0.99290985,0.000035167024,0.0063260393,0.00020462013,0.0000062641584],"about_ca_topic_score_codex":0.028691906,"about_ca_topic_score_gemma":0.020316217,"teacher_disagreement_score":0.028691906,"about_ca_system_score_codex":0.0025167752,"about_ca_system_score_gemma":0.0009491696,"threshold_uncertainty_score":0.05704981},"labels":[],"label_agreement":null},{"id":"W2554624099","doi":"10.1109/tia.2016.2626261","title":"Load Aggregation From Generation-Follows-Load to Load-Follows-Generation: Residential Loads","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Demand response; Load management; Load balancing (electrical power); Computer science; Electric power system; Grid; Electricity generation; Load profile; Power (physics); Distributed computing; Control engineering; Electrical engineering; Engineering; Electricity","score_opus":0.02244377912458292,"score_gpt":0.23526217049309534,"score_spread":0.2128183913685124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2554624099","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082872674,0.0004943916,0.8611222,0.0010653038,0.00025929863,0.00021494109,0.00045480905,0.004044255,0.049472064],"genre_scores_gemma":[0.89148945,0.0004848369,0.09453358,0.00022803566,0.00021532715,0.00008431971,0.00040250516,0.00030533058,0.012256629],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994993,0.00014212469,0.000024837065,0.000105008854,0.00017147759,0.000057307032],"domain_scores_gemma":[0.9995579,0.000082574676,0.00006701401,0.00015501649,0.000115403986,0.00002206817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003203621,0.0004394437,0.00037892623,0.00042850163,0.0007435045,0.0010206816,0.00060295494,0.00039015352,0.0032375124],"category_scores_gemma":[0.00076744525,0.00020148176,0.0003452479,0.0012180674,0.0005210661,0.0014455988,0.00082039286,0.000704253,0.0012206016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061007484,0.0003627935,0.009300137,0.00029009508,0.00012211263,0.0018384333,0.0013001544,0.30960655,0.039599016,0.16760467,0.033957753,0.43540815],"study_design_scores_gemma":[0.000031647836,0.00014200929,0.0071051554,0.00003709122,0.000059907914,0.0007585933,0.00043987765,0.8365998,0.034705926,0.0798813,0.04014861,0.00009001841],"about_ca_topic_score_codex":0.0032179304,"about_ca_topic_score_gemma":0.004928566,"teacher_disagreement_score":0.0032375124,"about_ca_system_score_codex":0.000670249,"about_ca_system_score_gemma":0.00047219073,"threshold_uncertainty_score":0.010830581},"labels":[],"label_agreement":null},{"id":"W2554827145","doi":"10.1109/epec.2010.5697208","title":"Design of a smart meter techno-economic model for electric utilities in Ontario","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Queen's University","funders":"","keywords":"Revenue; Profit (economics); Smart meter; Energy consumption; Computer science; Environmental economics; Smart grid; Engineering; Business; Electrical engineering; Economics","score_opus":0.02057360935713679,"score_gpt":0.19112657564258262,"score_spread":0.17055296628544583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2554827145","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6294794,0.00036034596,0.17521146,0.0019359661,0.00010836875,0.0013927721,0.0062529403,0.0005778184,0.18468095],"genre_scores_gemma":[0.96424717,0.00020421171,0.014142349,0.00005223431,0.000013067523,0.0005395947,0.0008500872,0.000038425096,0.019912751],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996375,0.00009075962,0.000011847072,0.000059202943,0.00010173265,0.00009892856],"domain_scores_gemma":[0.9994344,0.00020481259,0.000060341317,0.000017677135,0.00022910484,0.000053667707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006029828,0.0008921921,0.00067077327,0.0006975898,0.0013744412,0.0018285181,0.0018889586,0.0016034945,0.0071986793],"category_scores_gemma":[0.0013590928,0.0007169327,0.000654531,0.0009062112,0.0009441629,0.0009075074,0.00080309616,0.00093229034,0.0004499279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007462731,0.000039004983,0.0014594772,0.000034293236,0.000008310645,0.00011714899,0.000064965825,0.98935974,0.00040714015,0.0060109133,0.00055229955,0.0018721125],"study_design_scores_gemma":[0.000041843257,0.000024706555,0.00071301125,0.0000072933944,0.000012838915,0.000010199358,0.00010501392,0.996135,0.00016209284,0.0008874986,0.0018862465,0.000014230234],"about_ca_topic_score_codex":0.629412,"about_ca_topic_score_gemma":0.5424078,"teacher_disagreement_score":0.370588,"about_ca_system_score_codex":0.01793704,"about_ca_system_score_gemma":0.0105441995,"threshold_uncertainty_score":0.7455409},"labels":[],"label_agreement":null},{"id":"W2555580606","doi":"10.1109/pesgm.2016.7741187","title":"Whether to charge an electric vehicle or not? A near-optimal online approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates - Technology Futures","keywords":"Computer science; Online algorithm; A priori and a posteriori; Competitive analysis; Markov decision process; Scheduling (production processes); Electric vehicle; Smart grid; Electricity; Job shop scheduling; Markov process; Markov chain; Grid; Mathematical optimization; Upper and lower bounds; Operations research; Real-time computing; Schedule; Engineering; Algorithm","score_opus":0.018155657407041607,"score_gpt":0.22103802159958827,"score_spread":0.20288236419254665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555580606","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050372317,0.00061329856,0.9173635,0.001967303,0.0002362636,0.00020028306,0.00015801717,0.00069208746,0.028396837],"genre_scores_gemma":[0.79850775,0.0003604571,0.19321735,0.00042800035,0.00019735341,0.00009986839,0.00016611168,0.00009144053,0.006931725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917585,0.0002706451,0.00003323004,0.00022080142,0.00014343082,0.00015600155],"domain_scores_gemma":[0.9979354,0.0013486561,0.00018826827,0.00015601008,0.00024258859,0.00012903038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008041936,0.0007741931,0.0013890854,0.0005039544,0.0006440799,0.0015043233,0.0013466182,0.0014843611,0.008903537],"category_scores_gemma":[0.0034614822,0.0005181822,0.00041057955,0.000523058,0.00072357693,0.00192481,0.00084445206,0.0012712266,0.0011472666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005852301,0.0009761368,0.001937749,0.00024497882,0.00005479933,0.00030461195,0.000111723486,0.6395893,0.0040708845,0.0439903,0.013362621,0.2947716],"study_design_scores_gemma":[0.000036723242,0.000053352873,0.00015313497,0.000010122912,0.000010371689,0.00010089963,0.000044466153,0.98389417,0.00070081087,0.013749531,0.001237066,0.0000093682975],"about_ca_topic_score_codex":0.0034709265,"about_ca_topic_score_gemma":0.0037186968,"teacher_disagreement_score":0.008903537,"about_ca_system_score_codex":0.00089653523,"about_ca_system_score_gemma":0.0021924328,"threshold_uncertainty_score":0.029785275},"labels":[],"label_agreement":null},{"id":"W2555964569","doi":"10.5547/01956574.38.5.cwoo","title":"Winter Residential Optional Dynamic Pricing: British Columbia.","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agricultural economics; Environmental science; Geography; Business; Meteorology; Economics; Demography","score_opus":0.0041031124830723876,"score_gpt":0.1754397417552786,"score_spread":0.17133662927220622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555964569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8571702,0.0009341289,0.0022874584,0.0008758699,0.000056531237,0.00015465287,0.051494855,0.00025987808,0.08676647],"genre_scores_gemma":[0.91770494,0.0005996695,0.0013306515,0.00019707273,0.000010537879,0.00006424581,0.02360509,0.00005092805,0.056436796],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99959487,0.000019398698,0.0000133350095,0.00005499425,0.0002120906,0.00010528685],"domain_scores_gemma":[0.9988392,0.00005743184,0.000083804654,0.000039882314,0.0008412492,0.00013842969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018987883,0.00038650053,0.00017836873,0.0008787371,0.0011330626,0.0011456192,0.0007269283,0.0002473939,0.0068061166],"category_scores_gemma":[0.00087856676,0.0002083671,0.00022360646,0.003365704,0.00021589179,0.0003047655,0.00038680295,0.0003531821,0.0011369078],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034916465,0.0001559946,0.78851986,0.00017840015,0.00010768375,0.00068427273,0.00097026536,0.009217108,0.0015536636,0.0011702273,0.085097864,0.11199547],"study_design_scores_gemma":[0.000016077354,0.00003304208,0.9389352,0.0000412676,0.000031933836,0.00013460658,0.0020596494,0.0082105,0.00095432485,0.00013958852,0.04941782,0.000025981097],"about_ca_topic_score_codex":0.9869256,"about_ca_topic_score_gemma":0.9950493,"teacher_disagreement_score":0.017016556,"about_ca_system_score_codex":0.017016556,"about_ca_system_score_gemma":0.009157154,"threshold_uncertainty_score":0.123464346},"labels":[],"label_agreement":null},{"id":"W2558178876","doi":"10.1109/tsg.2016.2633280","title":"Considering Thermodynamic Characteristics of a CAES Facility in Self-Scheduling in Energy and Reserve Markets","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Compressed air energy storage; Electricity; Scheduling (production processes); Energy storage; Spinning; Revenue; Environmental science; Computer science; Engineering; Thermodynamics; Physics; Economics; Mechanical engineering; Electrical engineering; Operations management; Finance; Power (physics)","score_opus":0.009166326696854493,"score_gpt":0.1906162705339844,"score_spread":0.1814499438371299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2558178876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61491257,0.0002964671,0.36405155,0.00043151074,0.00008640905,0.00009629693,0.00015295619,0.00012824776,0.019843997],"genre_scores_gemma":[0.9954022,0.000054828804,0.0035521884,0.000012072442,0.000007789404,0.000012530626,0.000019376246,0.000014556325,0.00092437404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977845,0.00009214175,0.0000066154666,0.000029925375,0.000046061672,0.00004679114],"domain_scores_gemma":[0.999567,0.00020440068,0.00008328849,0.000034201417,0.00007130364,0.000039889987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005044963,0.00033432446,0.0004925001,0.000239186,0.00038436722,0.00080302724,0.0008489406,0.0006266948,0.0017316896],"category_scores_gemma":[0.0010860644,0.0002923406,0.0005600594,0.0003711393,0.0006387585,0.001551434,0.00055094314,0.00055899704,0.00014171386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002252951,0.000019908199,0.00058421,0.00001287458,0.0000074148275,0.00007904437,0.00001253717,0.9895532,0.0010737348,0.0070270235,0.000104667444,0.001502822],"study_design_scores_gemma":[0.000005264979,0.00001983858,0.0002632586,0.000001714789,0.0000040156197,0.0000135503915,0.000016688338,0.9978555,0.0003035575,0.001320946,0.00019145824,0.000004266427],"about_ca_topic_score_codex":0.009889441,"about_ca_topic_score_gemma":0.009374315,"teacher_disagreement_score":0.009889441,"about_ca_system_score_codex":0.0011320356,"about_ca_system_score_gemma":0.0011150222,"threshold_uncertainty_score":0.01966381},"labels":[],"label_agreement":null},{"id":"W2558502882","doi":"10.1109/isie.2016.7744972","title":"Active power load modeling based on uncertainties for Non Intrusive Load Monitoring","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Fondation de l’UQTR","keywords":"Computer science; Probabilistic logic; Cluster analysis; Power (physics); Variance (accounting); Electric power system; Subtractive color; Resistive touchscreen; Data mining; Machine learning; Artificial intelligence","score_opus":0.01271972404768009,"score_gpt":0.22111696988641347,"score_spread":0.20839724583873337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2558502882","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031464554,0.00007534487,0.96742076,0.00003263496,0.0000072711355,0.000013627257,0.00003215579,0.00020784308,0.0007457336],"genre_scores_gemma":[0.9731098,0.00011603093,0.025513435,0.000013762802,0.000016619959,0.00003581359,0.000072445895,0.00004120075,0.001080937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975985,0.00006772626,0.000011314827,0.000053754087,0.00008980849,0.000017438171],"domain_scores_gemma":[0.9996357,0.00021929224,0.00006268925,0.00004391499,0.000030503417,0.000007854655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003083713,0.00046845287,0.00041805516,0.00031757934,0.00019366966,0.0005301114,0.0005288593,0.0003450293,0.0006031417],"category_scores_gemma":[0.0012154753,0.00021936695,0.00043541862,0.0002932425,0.00028825062,0.0009122273,0.00039202048,0.0005391139,0.00016890961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036949918,0.000020998008,0.00082162087,0.000029533674,0.000016352375,0.000056029512,0.000057979512,0.9630057,0.0055677164,0.0049187015,0.00014383621,0.025324611],"study_design_scores_gemma":[2.5113297e-7,0.0000043651444,0.0001244835,7.753202e-7,0.0000010721695,0.000005466821,0.0000018944339,0.9988568,0.00032791842,0.00060404756,0.00007159621,0.000001340758],"about_ca_topic_score_codex":0.0021515337,"about_ca_topic_score_gemma":0.0023633712,"teacher_disagreement_score":0.0021515337,"about_ca_system_score_codex":0.00029721824,"about_ca_system_score_gemma":0.0002613313,"threshold_uncertainty_score":0.004278064},"labels":[],"label_agreement":null},{"id":"W2559146925","doi":"10.1109/isie.2016.7744974","title":"Development of real-time admittance analysis system for residential load monitoring","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Admittance; Computer science; Real-time computing; Environmental science; Engineering; Electrical engineering; Electrical impedance","score_opus":0.010619588854016626,"score_gpt":0.21646713827581748,"score_spread":0.20584754942180086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559146925","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07109791,0.0005295438,0.8961806,0.00039210432,0.00028862452,0.00040471193,0.00038761413,0.020501124,0.010217767],"genre_scores_gemma":[0.8012349,0.00027701672,0.1882396,0.00022146189,0.00015837284,0.0002662045,0.00046666243,0.00015501487,0.008980737],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99958366,0.00007135727,0.000028470935,0.00010544705,0.00017491048,0.000036110447],"domain_scores_gemma":[0.9996123,0.00006097385,0.000055090746,0.00006785655,0.00017528853,0.000028636363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034929006,0.0005727785,0.00045503213,0.0007963941,0.00026718664,0.000631864,0.0010292679,0.00044446083,0.004607081],"category_scores_gemma":[0.00054213824,0.0002198951,0.00020071784,0.00038456035,0.00016910525,0.00069802674,0.00032680694,0.00037614725,0.0014611635],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009811873,0.00037718902,0.00898792,0.0004306652,0.00010385071,0.0006557135,0.00049502513,0.01574152,0.29865512,0.0049151885,0.014164534,0.65449196],"study_design_scores_gemma":[0.00031709592,0.0016244897,0.014111199,0.00011840491,0.00018821078,0.002280104,0.00018392052,0.59853417,0.32622454,0.0020189807,0.054224253,0.00017466533],"about_ca_topic_score_codex":0.0011059284,"about_ca_topic_score_gemma":0.0010364441,"teacher_disagreement_score":0.004607081,"about_ca_system_score_codex":0.00034222522,"about_ca_system_score_gemma":0.00035941988,"threshold_uncertainty_score":0.015412211},"labels":[],"label_agreement":null},{"id":"W2560424504","doi":"10.1109/epec.2016.7771719","title":"Dynamic threshold algorithm with simplified appliance identification for smart meter privacy","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Smart meter; Identification (biology); Computer science; Smart grid; Compensation (psychology); Metre; Key (lock); Algorithm; Differential privacy; Information privacy; Real-time computing; Data mining; Computer security; Engineering; Electrical engineering","score_opus":0.009908898596534379,"score_gpt":0.21549266893161576,"score_spread":0.20558377033508138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2560424504","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008945954,0.0001309387,0.9894544,0.000091650516,0.00005187517,0.000030931707,0.000017901917,0.00032252367,0.0009538343],"genre_scores_gemma":[0.5254869,0.000293209,0.4696833,0.00022882622,0.00014819301,0.00012975966,0.00019493718,0.00009177938,0.003743113],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886036,0.00021910021,0.000096583404,0.00025331377,0.00046202817,0.00010871288],"domain_scores_gemma":[0.99870324,0.0005651275,0.00010667823,0.0003069271,0.0002787618,0.0000393497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008011211,0.00052308943,0.0007039641,0.000607644,0.00048583333,0.0013198352,0.0010379386,0.00087653025,0.0019249254],"category_scores_gemma":[0.0041986834,0.00022489317,0.0005813384,0.00087428314,0.00054851634,0.0019745708,0.000749669,0.0010467975,0.0007208803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006136627,0.0002309951,0.003102978,0.00015048479,0.0001289691,0.00023648112,0.00024184612,0.26760846,0.07169827,0.07012965,0.0040646223,0.58179355],"study_design_scores_gemma":[0.0000217915,0.00009963702,0.0006658683,0.000008060695,0.000021207292,0.00020951356,0.000022612408,0.97355044,0.011455172,0.010477763,0.0034478127,0.00002001933],"about_ca_topic_score_codex":0.0017296835,"about_ca_topic_score_gemma":0.0015341706,"teacher_disagreement_score":0.0019249254,"about_ca_system_score_codex":0.00052654685,"about_ca_system_score_gemma":0.0013337808,"threshold_uncertainty_score":0.0064395666},"labels":[],"label_agreement":null},{"id":"W2560764283","doi":"10.1109/epec.2016.7771763","title":"Non-intrusive load monitoring using wavelet design and co-testing of machine learning classifiers","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Wavelet; Load testing; Artificial intelligence; Machine learning; Pattern recognition (psychology)","score_opus":0.03379480620719277,"score_gpt":0.23300637679779165,"score_spread":0.19921157059059888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2560764283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19405286,0.00020258129,0.8035904,0.00008577284,0.00005496135,0.000115713236,0.000019505838,0.0010505635,0.00082760706],"genre_scores_gemma":[0.8776947,0.000083286715,0.12136036,0.000041724,0.000027781085,0.0001015135,0.00004778108,0.00008450169,0.00055822474],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969014,0.0010548073,0.00018447863,0.00046263906,0.0011751323,0.0002216124],"domain_scores_gemma":[0.9914642,0.0048579355,0.0010847378,0.0011897187,0.0012144179,0.0001889776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025078023,0.0011781389,0.0010796794,0.001017281,0.00026466395,0.0010400891,0.0012622926,0.0009860289,0.00088017085],"category_scores_gemma":[0.0115274815,0.00032081874,0.00044087577,0.00067893416,0.0006657004,0.0016552466,0.0009388323,0.0009872095,0.0004103379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023708262,0.001399384,0.015716529,0.00040089138,0.0002558974,0.00050565903,0.00031425213,0.15680952,0.21681407,0.0026744937,0.000729869,0.6020086],"study_design_scores_gemma":[0.00003249411,0.0009997754,0.0034436441,0.00001513772,0.000046137484,0.0004263186,0.00003526496,0.898954,0.09487113,0.0006605638,0.00049278454,0.000022684675],"about_ca_topic_score_codex":0.00035426088,"about_ca_topic_score_gemma":0.00046506917,"teacher_disagreement_score":0.0025078023,"about_ca_system_score_codex":0.00035194238,"about_ca_system_score_gemma":0.00040542785,"threshold_uncertainty_score":0.013262689},"labels":[],"label_agreement":null},{"id":"W2561332322","doi":"10.1109/smartgridcomm.2016.7778755","title":"EV-assisted battery load hiding: A Markov decision process approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Markov decision process; Computer science; Microgrid; Benchmark (surveying); Battery (electricity); Electricity; Energy consumption; Demand response; Process (computing); Markov process; Partially observable Markov decision process; Real-time computing; Markov chain; Markov model; Control (management); Artificial intelligence; Machine learning; Engineering; Power (physics)","score_opus":0.011353702362403857,"score_gpt":0.20797243071598406,"score_spread":0.1966187283535802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561332322","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010976794,0.0001217344,0.98684,0.0002060988,0.000019016765,0.000022530714,0.00003792109,0.00011035809,0.0016656043],"genre_scores_gemma":[0.94929194,0.0003392487,0.04614016,0.00012409162,0.000054656393,0.00007392936,0.00007850715,0.000027603737,0.00386985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992107,0.000287536,0.000028820985,0.00015844469,0.00018120302,0.000133267],"domain_scores_gemma":[0.998384,0.0011322227,0.0001573977,0.00008225539,0.00018515409,0.000059028305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013117734,0.0006668056,0.0008004328,0.00034142716,0.00033997497,0.000750941,0.0013139985,0.0009227128,0.0025681576],"category_scores_gemma":[0.002644505,0.0004177771,0.0006732938,0.00043509644,0.0008564705,0.0011338531,0.0010227502,0.0013097554,0.00027822054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009845931,0.000049878192,0.0006880953,0.000053392003,0.000033770106,0.0000948754,0.000056704797,0.9495309,0.0017037288,0.026423112,0.000599716,0.020667404],"study_design_scores_gemma":[0.000004219288,0.000012438771,0.000046215377,0.0000021504393,0.0000049542273,0.0000095325895,0.0000031422796,0.99621046,0.00030573003,0.0032653718,0.00013161819,0.000004158963],"about_ca_topic_score_codex":0.0044778483,"about_ca_topic_score_gemma":0.0039552473,"teacher_disagreement_score":0.0044778483,"about_ca_system_score_codex":0.00090478465,"about_ca_system_score_gemma":0.0010626722,"threshold_uncertainty_score":0.008903563},"labels":[],"label_agreement":null},{"id":"W2561560843","doi":"10.1109/appeec.2016.7779872","title":"Connectivity for Home Energy Management applications","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Interoperability; Smart grid; Ethernet; Default gateway; Computer science; Wireless; Energy management; Computer network; Energy management system; Embedded system; Communications protocol; Telecommunications; Engineering; Energy (signal processing); Operating system; Electrical engineering","score_opus":0.005782952042238004,"score_gpt":0.18151547326965906,"score_spread":0.17573252122742106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561560843","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04095272,0.015475145,0.37071797,0.003822935,0.00085326424,0.0004793617,0.001510178,0.011378947,0.5548095],"genre_scores_gemma":[0.681838,0.024088895,0.17110112,0.0017174742,0.0014240363,0.0007007261,0.0069662333,0.0015615278,0.11060208],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99969125,0.0000706572,0.000018262694,0.000041820633,0.00013050309,0.00004752657],"domain_scores_gemma":[0.99976546,0.00006731633,0.000018313269,0.000042732583,0.00008754562,0.000018490093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022047557,0.0005276242,0.00021371958,0.00085161795,0.0005318074,0.0013111051,0.00068118144,0.00071968115,0.020124393],"category_scores_gemma":[0.0008408817,0.00014909444,0.0002151444,0.0013716983,0.00016198771,0.0017076025,0.0008464423,0.0004693956,0.006308106],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015426193,0.00013868467,0.0026259476,0.0009601918,0.000031391988,0.0013575859,0.00045853909,0.0048800507,0.02043337,0.11368792,0.08590065,0.7693714],"study_design_scores_gemma":[0.000022704011,0.00010247489,0.0038019707,0.00040817523,0.000044735913,0.002237597,0.00034747887,0.023449961,0.010015226,0.033649538,0.92588264,0.00003753046],"about_ca_topic_score_codex":0.00055873336,"about_ca_topic_score_gemma":0.00067990704,"teacher_disagreement_score":0.020124393,"about_ca_system_score_codex":0.00026683966,"about_ca_system_score_gemma":0.0002640457,"threshold_uncertainty_score":0.06732285},"labels":[],"label_agreement":null},{"id":"W2564594983","doi":"10.1109/cisis.2016.125","title":"Heuristic Algorithm Based Energy Management System in Smart Grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Heuristic; Smart grid; Energy management; Energy management system; Meta heuristic; Algorithm; Energy (signal processing); Distributed computing; Artificial intelligence; Engineering; Mathematics; Electrical engineering","score_opus":0.0040959453519711225,"score_gpt":0.15855002806655186,"score_spread":0.15445408271458072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564594983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08840326,0.00157335,0.8751449,0.00042929928,0.0002104575,0.00026216224,0.00020687973,0.0017399368,0.03202975],"genre_scores_gemma":[0.8920108,0.0005266556,0.101168774,0.00012693004,0.00004054495,0.00020383013,0.0001713143,0.000035768273,0.005715323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979466,0.000066307875,0.000012849514,0.000034650242,0.000060491464,0.000030935764],"domain_scores_gemma":[0.99984443,0.00005854709,0.000033914203,0.000012565955,0.00003838338,0.000012054116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032882116,0.00038668365,0.0005963922,0.00044168258,0.0003458803,0.0010047355,0.00057410175,0.00054004067,0.0022239517],"category_scores_gemma":[0.0005660653,0.00017934063,0.000254442,0.0005202256,0.0002569856,0.00052611314,0.00030734227,0.00032320808,0.0003415128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099019875,0.00009024345,0.0008407344,0.00010380441,0.000043561457,0.00009824761,0.00003899833,0.9170411,0.002859687,0.008077287,0.0018532655,0.06885406],"study_design_scores_gemma":[0.000022968854,0.00005371382,0.00018853805,0.000008513865,0.000010262281,0.000030890733,0.000015001182,0.99513704,0.00088959583,0.0020343533,0.0016034654,0.000005768191],"about_ca_topic_score_codex":0.003750625,"about_ca_topic_score_gemma":0.0033959604,"teacher_disagreement_score":0.003750625,"about_ca_system_score_codex":0.00049277616,"about_ca_system_score_gemma":0.00079430867,"threshold_uncertainty_score":0.0074575543},"labels":[],"label_agreement":null},{"id":"W2564616218","doi":"10.1007/s40565-016-0255-y","title":"Hierarchical and distributed demand response control strategy for thermostatically controlled appliances in smart grid","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Engineering and Physical Sciences Research Council; State Grid Corporation of China; National Natural Science Foundation of China","keywords":"Demand response; Control (management); Smart grid; Frequency regulation; Renewable energy; Grid; Computer science; Feature (linguistics); Power (physics); Engineering; Control engineering; Electric power system; Electricity; Artificial intelligence","score_opus":0.00854508436138541,"score_gpt":0.21100375311103275,"score_spread":0.20245866874964735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564616218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1350603,0.0003626844,0.851104,0.00028695268,0.000096115735,0.00013780067,0.000051701376,0.0008802211,0.012020135],"genre_scores_gemma":[0.9903352,0.000043107615,0.008578928,0.000030416893,0.000011356949,0.000031917032,0.000020189378,0.0000069480593,0.00094185333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996418,0.00005022967,0.000023981787,0.00011684006,0.000104424194,0.00006280243],"domain_scores_gemma":[0.99979025,0.00003920824,0.00005296099,0.000019529618,0.000076376935,0.000021759994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003632376,0.0005598422,0.00044160953,0.00026532516,0.000494902,0.0005933136,0.00080784684,0.0003866249,0.0012233858],"category_scores_gemma":[0.00034402474,0.00018818119,0.00031584586,0.00029247944,0.00036544315,0.00053260487,0.0005273296,0.0003537415,0.00019736879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035257085,0.0002991146,0.0012855125,0.00018372673,0.00005145351,0.00026886433,0.0003669828,0.842979,0.033358075,0.014452903,0.002728735,0.103673026],"study_design_scores_gemma":[0.000023122147,0.00009010757,0.0003221698,0.0000030961735,0.0000093674935,0.000021666609,0.000022961778,0.99599236,0.0017552715,0.0013035142,0.00044739066,0.000008993444],"about_ca_topic_score_codex":0.006137106,"about_ca_topic_score_gemma":0.006884951,"teacher_disagreement_score":0.006137106,"about_ca_system_score_codex":0.00068264146,"about_ca_system_score_gemma":0.00055326015,"threshold_uncertainty_score":0.01220274},"labels":[],"label_agreement":null},{"id":"W2564673630","doi":"10.1109/tsg.2016.2643700","title":"Non-Intrusive Energy Use Monitoring for a Group of Electrical Appliances","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"State Grid Corporation of China; China Scholarship Council; China Postdoctoral Science Foundation; University of Alberta","keywords":"Energy (signal processing); Energy consumption; Bernoulli's principle; Electric potential energy; Event (particle physics); Power (physics); Engineering; Reliability engineering; Automotive engineering; Simulation; Computer science; Real-time computing; Electrical engineering; Statistics; Mathematics","score_opus":0.014611465036742604,"score_gpt":0.2143287983958291,"score_spread":0.1997173333590865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564673630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40979615,0.0005757255,0.5836328,0.00009957958,0.000048529124,0.00014146093,0.00025536862,0.0007516191,0.004698706],"genre_scores_gemma":[0.96654296,0.00015598576,0.032206267,0.000024151244,0.00001919678,0.000049850627,0.000110199944,0.000019783913,0.00087147695],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99928385,0.00017852952,0.000043207645,0.00017120471,0.00029077055,0.00003237001],"domain_scores_gemma":[0.9986008,0.0006155193,0.00038671086,0.00019557822,0.0001697948,0.000031567495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033011308,0.00045649667,0.0004359062,0.0010297981,0.00021183123,0.0003595136,0.00058089505,0.0003088435,0.00054762803],"category_scores_gemma":[0.0019971926,0.00017105258,0.0002167002,0.00070346874,0.00020667614,0.0007009773,0.0003826319,0.00026739205,0.00024181195],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005535135,0.00041836698,0.1593086,0.00055946753,0.00028634846,0.0007126572,0.000836034,0.07103403,0.12517223,0.0037961158,0.0016146081,0.63570803],"study_design_scores_gemma":[0.000031900458,0.00074413413,0.1720551,0.00010254718,0.00015624473,0.0022163366,0.00056098885,0.7184179,0.09336531,0.005557048,0.006709818,0.00008256968],"about_ca_topic_score_codex":0.00038617512,"about_ca_topic_score_gemma":0.0010068993,"teacher_disagreement_score":0.0010297981,"about_ca_system_score_codex":0.00015491042,"about_ca_system_score_gemma":0.00012427785,"threshold_uncertainty_score":0.0018319488},"labels":[],"label_agreement":null},{"id":"W2568301553","doi":"10.1109/jiot.2016.2647625","title":"Dynamic Load Balancing Applying Water-Filling Approach in Smart Grid Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ryerson University","keywords":"Computer science; Smart grid; Load balancing (electrical power); Dynamic demand; Demand response; Distributed computing; Grid; Scheduling (production processes); Electric power system; Power (physics); Load management; Reliability (semiconductor); Context (archaeology); Reliability engineering; Real-time computing; Mathematical optimization; Electricity; Engineering; Electrical engineering","score_opus":0.011086792945396506,"score_gpt":0.21435808274625817,"score_spread":0.20327128980086168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2568301553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027414806,0.00019131319,0.9697631,0.000111977584,0.00003133027,0.00004170946,0.000022689912,0.00024663666,0.0021764124],"genre_scores_gemma":[0.9092588,0.0001528231,0.089278035,0.00005517941,0.000024418696,0.00005280634,0.000038140246,0.00003876097,0.0011010632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963856,0.00010721425,0.000016897911,0.00008149346,0.000087748725,0.00006809683],"domain_scores_gemma":[0.99980396,0.00008706342,0.000037579808,0.000022023516,0.000034524095,0.000014826103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005341842,0.0005553455,0.00090107915,0.00040038564,0.00054236455,0.00075735204,0.00079837913,0.0005054966,0.00111746],"category_scores_gemma":[0.0007315574,0.000316749,0.00039581454,0.0006276527,0.0006621526,0.0011679439,0.00067611795,0.0004018538,0.00013502894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000811974,0.000047264475,0.00034631605,0.000054492048,0.0000167301,0.000072979565,0.00010723733,0.92263025,0.0038589023,0.014278436,0.0006528139,0.057853293],"study_design_scores_gemma":[0.0000047627277,0.00002077534,0.000043148328,0.0000019124534,0.0000022200848,0.000009572834,0.0000104650935,0.9957426,0.00046837894,0.0033425477,0.00034980924,0.0000037882942],"about_ca_topic_score_codex":0.0037027064,"about_ca_topic_score_gemma":0.0033983511,"teacher_disagreement_score":0.0037027064,"about_ca_system_score_codex":0.000659001,"about_ca_system_score_gemma":0.0007648224,"threshold_uncertainty_score":0.007362306},"labels":[],"label_agreement":null},{"id":"W2568495984","doi":"10.1049/iet-gtd.2016.0231","title":"Optimal scheduling of independently operated, locally controlled energy storage systems as dispatchable assets in a competitive electricity market","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dispatchable generation; Electricity market; Electricity; Energy storage; Scheduling (production processes); Computer science; Industrial organization; Business; Operations management; Renewable energy; Distributed generation; Electrical engineering; Economics; Engineering","score_opus":0.008859297620424193,"score_gpt":0.22093851760281308,"score_spread":0.21207921998238888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2568495984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45733294,0.00040467334,0.53248715,0.0004224056,0.00007957001,0.00019969836,0.00010719821,0.00026839058,0.008697841],"genre_scores_gemma":[0.9819125,0.000059735623,0.01686259,0.00001574784,0.000007937202,0.000032243337,0.000021172353,0.0000134705115,0.0010747195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996599,0.000119628305,0.000016262817,0.00006381217,0.000055482386,0.0000848821],"domain_scores_gemma":[0.99926454,0.00036046715,0.00016732805,0.00003733152,0.00008546916,0.00008486763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079458574,0.00057764887,0.00071783515,0.00027683907,0.00032105405,0.0010183176,0.0006524822,0.0005176313,0.0016812298],"category_scores_gemma":[0.0015980463,0.00030623988,0.0002287048,0.00034906736,0.0006006477,0.0009107556,0.00042811682,0.00056016055,0.00014641591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001440823,0.000034247325,0.00031385556,0.000019498675,0.000009329443,0.00004126665,0.000025684012,0.9804201,0.001262409,0.005690897,0.0004156654,0.011622873],"study_design_scores_gemma":[0.000011796771,0.000022947768,0.00006396882,9.784918e-7,0.0000024608385,0.000003998215,0.000009243228,0.99813664,0.00034402194,0.0013073569,0.0000940854,0.0000024267013],"about_ca_topic_score_codex":0.005002199,"about_ca_topic_score_gemma":0.0049448316,"teacher_disagreement_score":0.005002199,"about_ca_system_score_codex":0.0011143936,"about_ca_system_score_gemma":0.0014699195,"threshold_uncertainty_score":0.0099461675},"labels":[],"label_agreement":null},{"id":"W2570059685","doi":"10.1063/1.4973713","title":"Economically efficient and environment friendly energy management in rural area","year":2017,"lang":"en","type":"article","venue":"Journal of Renewable and Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Electricity; Biogas; Environmental pollution; Electricity generation; Environmental economics; Multi-objective optimization; Computer science; Environmental science; Business; Engineering; Waste management; Mathematical optimization; Mathematics; Economics; Environmental protection","score_opus":0.0034543187497351265,"score_gpt":0.16959690325852894,"score_spread":0.16614258450879382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2570059685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41107896,0.0013788529,0.548021,0.0013248733,0.00004820179,0.00016375151,0.00027529814,0.0003404234,0.037368514],"genre_scores_gemma":[0.97547716,0.00040937297,0.020223113,0.000040694187,0.0000072120956,0.00003690106,0.000054839977,0.00001699009,0.003733739],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990225,0.000031191918,0.000003046138,0.000017065538,0.000023505947,0.000022905682],"domain_scores_gemma":[0.99993956,0.000018333307,0.000015268637,0.000004055907,0.000015110682,0.000007693957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016292754,0.00022334096,0.0002848602,0.000247851,0.00035627777,0.000671763,0.0004224801,0.00045931424,0.0016128416],"category_scores_gemma":[0.00020153439,0.0001437274,0.00018242888,0.00055167696,0.00021072589,0.00065143214,0.00047276067,0.00024832453,0.00021542296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007586436,0.00016389186,0.0028289417,0.00015326352,0.000030471532,0.00062877184,0.00008710709,0.8947392,0.022562703,0.014771647,0.0023645025,0.061593518],"study_design_scores_gemma":[0.000021819336,0.00012298423,0.0019744048,0.000017336552,0.000010560293,0.00014268952,0.00029429627,0.9736791,0.0025690163,0.014956985,0.0061988123,0.000011940843],"about_ca_topic_score_codex":0.0019805715,"about_ca_topic_score_gemma":0.0034124288,"teacher_disagreement_score":0.0019805715,"about_ca_system_score_codex":0.00029945414,"about_ca_system_score_gemma":0.00046158474,"threshold_uncertainty_score":0.005395472},"labels":[],"label_agreement":null},{"id":"W2570248682","doi":"10.1109/cdc.2016.7798912","title":"An outer approximation of the Minkowski sum of convex conic sets with application to demand response","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Mathematical optimization; Operator (biology); Scheduling (production processes); Conic section; Regular polygon; Computation; Conic optimization; Quadratic equation; Minkowski addition; Computer science; Minkowski space; Mathematics; Convex optimization; Convex combination; Algorithm","score_opus":0.004979287919248975,"score_gpt":0.19893622258122085,"score_spread":0.19395693466197186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2570248682","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075069247,0.00010210751,0.98756135,0.00014887161,0.000040346014,0.000015825755,0.00010290246,0.00010503394,0.004416668],"genre_scores_gemma":[0.52703595,0.00075114105,0.45900455,0.00030873573,0.00015685256,0.00016233831,0.000725049,0.00039818583,0.011457148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926883,0.00026843074,0.000033611734,0.00009388101,0.00025708915,0.000078202334],"domain_scores_gemma":[0.99815744,0.0010340207,0.00018490812,0.00020477419,0.00031227103,0.000106599284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013880851,0.0012443471,0.00076879055,0.0005903336,0.0003785621,0.0017318397,0.0009205964,0.0005425109,0.0024401986],"category_scores_gemma":[0.004906281,0.0004245791,0.000814641,0.00075147644,0.0012048435,0.002033248,0.001117517,0.0019326913,0.00058612146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003533593,0.00002822416,0.00033876926,0.00006814571,0.000014105642,0.00008130439,0.00005504006,0.8810221,0.0013553322,0.10302394,0.0018965114,0.012081137],"study_design_scores_gemma":[8.039127e-7,0.0000070301408,0.000031020478,0.0000032172306,8.620991e-7,0.000012410445,0.0000054581205,0.98518234,0.00020040355,0.01401585,0.0005372439,0.0000033718763],"about_ca_topic_score_codex":0.0034248515,"about_ca_topic_score_gemma":0.0031556438,"teacher_disagreement_score":0.0034248515,"about_ca_system_score_codex":0.0009802263,"about_ca_system_score_gemma":0.0009629128,"threshold_uncertainty_score":0.008163214},"labels":[],"label_agreement":null},{"id":"W2571230811","doi":"10.1109/tsg.2017.2648509","title":"Volt-VAR Control Through Joint Optimization of Capacitor Bank Switching, Renewable Energy, and Home Appliances","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Load shifting; Renewable energy; AC power; Voltage drop; Smart grid; Computer science; Voltage reduction; Energy storage; Voltage; Capacitor; Automotive engineering; Electrical engineering; Power (physics); Engineering; Electricity","score_opus":0.01388021243448951,"score_gpt":0.20454362952251065,"score_spread":0.19066341708802115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2571230811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06657841,0.00091520837,0.90906674,0.000582398,0.00014879323,0.000070677816,0.00009453202,0.00063669885,0.021906603],"genre_scores_gemma":[0.9686243,0.00027742007,0.026056651,0.00011283419,0.000036064182,0.00006165987,0.000055601922,0.0000584147,0.0047170403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976724,0.00006442754,0.000008303561,0.000047778547,0.000061688326,0.000050488998],"domain_scores_gemma":[0.9997075,0.0001647877,0.000045919944,0.0000135976325,0.000049137514,0.000019095603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005899089,0.00085338915,0.00082123245,0.00040364044,0.00035511432,0.0009955206,0.0006864674,0.0006146093,0.002550461],"category_scores_gemma":[0.0008547344,0.00046002495,0.00046873785,0.0006296181,0.00050002284,0.00058794295,0.00050540885,0.0007121643,0.00019892993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019183508,0.00001446954,0.00008756635,0.00001420733,0.000010694811,0.000013554339,0.0000054639377,0.99177074,0.0003365894,0.002081177,0.00032502195,0.0053213285],"study_design_scores_gemma":[0.0000037979792,0.0000069283356,0.000025027224,0.0000013034816,0.0000028887107,0.0000020237947,0.00000169136,0.9990054,0.00007344211,0.0007577964,0.000118623255,0.0000012524417],"about_ca_topic_score_codex":0.012282128,"about_ca_topic_score_gemma":0.010005698,"teacher_disagreement_score":0.012282128,"about_ca_system_score_codex":0.000865369,"about_ca_system_score_gemma":0.001049487,"threshold_uncertainty_score":0.024421275},"labels":[],"label_agreement":null},{"id":"W2571653954","doi":"10.1109/icset.2016.7811816","title":"Minmax profit sharing scheme for cooperative wind power producers","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Mathematical optimization; Minimax; Profit (economics); Computer science; Cooperative game theory; Wind power; Computation; Electricity; Electricity market; Operations research; Microeconomics; Game theory; Environmental economics; Economics; Mathematics; Engineering; Algorithm","score_opus":0.013502146711945695,"score_gpt":0.21548487338105557,"score_spread":0.20198272666910988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2571653954","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035512973,0.000075949916,0.96009165,0.00008403988,0.000025446687,0.000076630626,0.0000365801,0.0001128848,0.0039837784],"genre_scores_gemma":[0.9216596,0.0000688311,0.0757711,0.0000575765,0.000019266814,0.00011054356,0.000044839,0.000031787913,0.0022365013],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889624,0.00047253293,0.00004365023,0.00019597744,0.00022138789,0.00017015469],"domain_scores_gemma":[0.9992355,0.00033849117,0.0001183519,0.00013756125,0.000105161205,0.00006481989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018063885,0.00081160414,0.0008274876,0.00038273077,0.00059461704,0.0010979008,0.001678733,0.0005476147,0.0024701261],"category_scores_gemma":[0.0023282953,0.0002746494,0.00048749172,0.0005853695,0.0008117313,0.0014996284,0.0015976666,0.00070074014,0.00034772514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003095921,0.000118975404,0.00059883675,0.00008724696,0.0000733419,0.00018723779,0.00024298705,0.83385307,0.009173511,0.08634103,0.0015565258,0.06745764],"study_design_scores_gemma":[0.000011647261,0.000047305344,0.00007962723,0.0000041421126,0.000007635824,0.000044645276,0.0000243721,0.9802673,0.0015032066,0.017255442,0.0007471432,0.000007530658],"about_ca_topic_score_codex":0.0008030595,"about_ca_topic_score_gemma":0.0010844443,"teacher_disagreement_score":0.0024701261,"about_ca_system_score_codex":0.0009793782,"about_ca_system_score_gemma":0.0010657543,"threshold_uncertainty_score":0.009553254},"labels":[],"label_agreement":null},{"id":"W2574286572","doi":"","title":"Efficient Appliances Recognition in Smart Homes Based on Active and Reactive Power, Fast Fourier Transform and Decision Trees.","year":2015,"lang":"en","type":"article","venue":"National Conference on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Computer science; AC power; Decision tree; Fourier transform; Artificial intelligence; Power (physics); Computer vision; Speech recognition; Mathematics","score_opus":0.07435391982588865,"score_gpt":0.29191103222261383,"score_spread":0.21755711239672518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2574286572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21970055,0.00075895974,0.77340996,0.00028088316,0.00015801893,0.000064818625,0.00034238762,0.0015145496,0.003769782],"genre_scores_gemma":[0.9211335,0.00021933057,0.07659289,0.00004210392,0.000049186172,0.000036549307,0.00031521122,0.000034908335,0.0015763033],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998022,0.000046437453,0.000014964477,0.00004077111,0.00006119646,0.00003443992],"domain_scores_gemma":[0.99979454,0.000099554796,0.000021797576,0.000012141426,0.000060513845,0.000011366788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027631593,0.0003407974,0.00044750737,0.0005924431,0.00020164973,0.0003834241,0.00029537105,0.00044036884,0.0011374088],"category_scores_gemma":[0.0007053115,0.00015989182,0.00033881966,0.00046766447,0.00013740506,0.00077586586,0.00023893117,0.00038290813,0.00047412087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083314563,0.00041733013,0.010324377,0.00018615664,0.00009725519,0.00044737302,0.00014520531,0.14841533,0.03763029,0.0035723809,0.009305449,0.7886257],"study_design_scores_gemma":[0.000014443906,0.000042228578,0.0037643642,0.00000678761,0.000018992458,0.00007029627,0.000058470992,0.98800385,0.005804644,0.001669526,0.00054026267,0.0000062152094],"about_ca_topic_score_codex":0.0026567122,"about_ca_topic_score_gemma":0.004561959,"teacher_disagreement_score":0.0026567122,"about_ca_system_score_codex":0.00020069125,"about_ca_system_score_gemma":0.00024781484,"threshold_uncertainty_score":0.0052824616},"labels":[],"label_agreement":null},{"id":"W2575366990","doi":"10.3233/978-1-61499-672-9-1646","title":"On Truthful Auction Mechanisms for Electricity Allocation","year":2016,"lang":"en","type":"book-chapter","venue":"Frontiers in artificial intelligence and applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Vickrey–Clarke–Groves auction; Microeconomics; Computer science; Business; Economics; Auction theory; Common value auction","score_opus":0.02090184446914932,"score_gpt":0.22731757777793857,"score_spread":0.20641573330878926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575366990","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00881317,0.016703352,0.81105995,0.005022759,0.0015088682,0.00023434439,0.00028082548,0.00047061584,0.15590616],"genre_scores_gemma":[0.5459598,0.028233819,0.28710353,0.0026452716,0.0027685547,0.00086628797,0.00047236684,0.00040724914,0.13154313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99845815,0.0005864828,0.00010031883,0.00023527748,0.0004695781,0.00015017932],"domain_scores_gemma":[0.9983078,0.0011155768,0.000097947865,0.00027768663,0.000154253,0.000046717418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032109255,0.0014462996,0.0008839445,0.0009756683,0.0008975078,0.0037608552,0.0020978176,0.0024776915,0.009558957],"category_scores_gemma":[0.0052646445,0.00057065475,0.0013435673,0.0017528523,0.0030671295,0.007915593,0.001514746,0.00411878,0.0018160448],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019416362,0.000024577539,0.00002798373,0.00009796742,0.000013912861,0.000031177166,0.00005757099,0.007987812,0.00022303865,0.972875,0.003493261,0.015148269],"study_design_scores_gemma":[0.000025934136,0.000024442457,0.000034381694,0.00006703575,0.00001065526,0.00006555222,0.000015883954,0.02149027,0.00019907208,0.9616763,0.016376486,0.000013995781],"about_ca_topic_score_codex":0.00080320024,"about_ca_topic_score_gemma":0.00040260743,"teacher_disagreement_score":0.009558957,"about_ca_system_score_codex":0.0022293366,"about_ca_system_score_gemma":0.0017734439,"threshold_uncertainty_score":0.031977832},"labels":[],"label_agreement":null},{"id":"W2575468172","doi":"10.24251/hicss.2017.365","title":"Learning to Shift Thermostatically Controlled Loads","year":2017,"lang":"en","type":"article","venue":"Proceedings of the ... Annual Hawaii International Conference on System Sciences/Proceedings of the Annual Hawaii International Conference on System Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Demand response; Regret; Computer science; A priori and a posteriori; Key (lock); Load management; Mathematical optimization; Grid; Adversarial system; Load balancing (electrical power); Thompson sampling; Artificial intelligence; Machine learning; Electricity; Engineering; Mathematics","score_opus":0.03144026382206932,"score_gpt":0.281180233242323,"score_spread":0.24973996942025367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575468172","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13443802,0.000125576,0.8570617,0.0006905854,0.000090506044,0.00006203363,0.00009003625,0.0013993214,0.006042224],"genre_scores_gemma":[0.96898925,0.000045674038,0.027941238,0.00021948726,0.000038933624,0.00004427251,0.0000730206,0.000045221677,0.0026029847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970776,0.00008111304,0.000010216055,0.00008984802,0.000053213294,0.00005776711],"domain_scores_gemma":[0.99917287,0.00039322424,0.00013930882,0.00014402995,0.00009776925,0.000052654406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084942934,0.0006354731,0.00057954266,0.00016279213,0.00030459443,0.0005430378,0.0009139133,0.00078883587,0.0019659747],"category_scores_gemma":[0.0025641604,0.00025396093,0.00031998206,0.00022178212,0.00093956204,0.0008699757,0.0009028251,0.0011275499,0.0006020904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014360732,0.00007509707,0.0009662272,0.000019869123,0.000017256865,0.00003582727,0.000038617967,0.9522249,0.0027012695,0.004879112,0.00180272,0.037095457],"study_design_scores_gemma":[0.0000050447325,0.000013705239,0.00006148398,0.0000011721565,0.0000013247688,0.0000055117116,0.000003132734,0.9974975,0.000581059,0.0016702476,0.00015801548,0.0000017541918],"about_ca_topic_score_codex":0.0030733454,"about_ca_topic_score_gemma":0.0028128107,"teacher_disagreement_score":0.0030733454,"about_ca_system_score_codex":0.00063107983,"about_ca_system_score_gemma":0.0007305751,"threshold_uncertainty_score":0.006576836},"labels":[],"label_agreement":null},{"id":"W2588383513","doi":"10.1109/sasg.2016.7849660","title":"Quantifying the value of pumped storage hydro (PSH) in the Saudi electric grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Grid; Pumped-storage hydroelectricity; Value (mathematics); Computer science; Environmental science; Electrical engineering; Distributed generation; Engineering; Renewable energy; Geology; Geodesy","score_opus":0.016825142678433536,"score_gpt":0.21671616606080377,"score_spread":0.19989102338237022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588383513","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9792183,0.0004059652,0.0066114157,0.0006224716,0.000020936246,0.000029357134,0.0005026623,0.000025743795,0.012563149],"genre_scores_gemma":[0.99881434,0.00008140027,0.00070114323,0.000007664344,0.0000026716373,0.0000022259376,0.000053370357,0.0000027908784,0.00033442798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997031,0.00015003383,0.0000136909985,0.000025926696,0.00007423842,0.000032892527],"domain_scores_gemma":[0.99876213,0.0007557998,0.0001429302,0.00006660166,0.00021997262,0.000052604657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008186412,0.0003812045,0.00017788909,0.00045282536,0.0002795993,0.0014013582,0.0003956604,0.000522474,0.0013871957],"category_scores_gemma":[0.0031909933,0.00015604141,0.00025581464,0.00057159265,0.0004614004,0.0018164201,0.00054284843,0.0004655431,0.000071002134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031483837,0.000048920207,0.019104758,0.00012757881,0.000077365854,0.00038374666,0.000103170554,0.9227641,0.0033142418,0.030839665,0.0007268012,0.02219472],"study_design_scores_gemma":[0.000026001018,0.0002010034,0.01786236,0.000059110447,0.00007819347,0.000117991956,0.0007405196,0.96044797,0.004513681,0.013575146,0.00233428,0.000043813936],"about_ca_topic_score_codex":0.015907183,"about_ca_topic_score_gemma":0.025000012,"teacher_disagreement_score":0.015907183,"about_ca_system_score_codex":0.002588974,"about_ca_system_score_gemma":0.0006167905,"threshold_uncertainty_score":0.031629145},"labels":[],"label_agreement":null},{"id":"W2588632072","doi":"10.1109/npsc.2016.7858900","title":"Ancillary services in India — Evolution, implementation and benefits","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Electricity market; Electricity; Renewable energy; Commission; Core (optical fiber); Grid; Business; Environmental economics; Electricity retailing; Industrial organization; Telecommunications; Computer science; Engineering; Economics; Finance; Electrical engineering","score_opus":0.0046461452223213314,"score_gpt":0.19165387726380348,"score_spread":0.18700773204148216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588632072","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.794468,0.0031176293,0.007157061,0.0062426385,0.00019119093,0.0000804052,0.0005426301,0.00044740885,0.18775307],"genre_scores_gemma":[0.99206185,0.0010733755,0.001225586,0.00018388218,0.000038244612,0.000007929899,0.00010806421,0.000018679168,0.0052824775],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989568,0.00018671919,0.000046628542,0.00007869172,0.00045254405,0.00027860934],"domain_scores_gemma":[0.99860364,0.00036957514,0.00026815356,0.00009842059,0.0004552702,0.00020496872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006735759,0.00024265492,0.00011182741,0.00095552974,0.0007253979,0.0025738643,0.0008436988,0.0003774434,0.0033960491],"category_scores_gemma":[0.0012345103,0.00014058143,0.0002696133,0.0019466238,0.00094401446,0.001274719,0.0011669091,0.00080410123,0.00034764296],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005338169,0.0005200089,0.06954543,0.00091268413,0.00006553077,0.0044272896,0.0034763785,0.02341048,0.024888633,0.26580945,0.011913188,0.5944971],"study_design_scores_gemma":[0.000054893102,0.0011681343,0.5185086,0.0004955156,0.00014921991,0.0063808816,0.011664307,0.030718053,0.024837466,0.028475229,0.3772868,0.0002608451],"about_ca_topic_score_codex":0.020517766,"about_ca_topic_score_gemma":0.020022998,"teacher_disagreement_score":0.020517766,"about_ca_system_score_codex":0.0030551432,"about_ca_system_score_gemma":0.0033156672,"threshold_uncertainty_score":0.040796697},"labels":[],"label_agreement":null},{"id":"W2588962148","doi":"10.1109/isgteurope.2016.7856285","title":"A bi-linear optimization model for collaborative energy management in smart grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Linear programming; Bilinear interpolation; Smart grid; Computer science; Integer programming; Optimization problem; Pareto principle; Linear model; Grid; Mathematics; Engineering","score_opus":0.013288374337810088,"score_gpt":0.2080935191301088,"score_spread":0.1948051447922987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588962148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0084768105,0.00022029842,0.9839662,0.00024943947,0.00003810525,0.00004171487,0.00008897687,0.00017171411,0.006746743],"genre_scores_gemma":[0.85908616,0.00066932203,0.12548475,0.0002093094,0.000064553016,0.00046972904,0.00026092088,0.00010314991,0.013652163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910444,0.0003652547,0.000036108144,0.00015181497,0.00022729521,0.00011509219],"domain_scores_gemma":[0.9993807,0.0003420922,0.00008216682,0.000041842024,0.00011985705,0.000033222594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011355215,0.0008624734,0.0010659214,0.00036663673,0.000539118,0.001715876,0.0012850545,0.0013163809,0.0044720746],"category_scores_gemma":[0.001814589,0.00058029406,0.00085734384,0.00087982335,0.00064373866,0.0017427474,0.0012001279,0.0015127885,0.00074045453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017406717,0.00001979457,0.00010826031,0.000034025878,0.000009075614,0.000031026124,0.000024900939,0.98562664,0.0003100475,0.0095963655,0.00031034718,0.0039120694],"study_design_scores_gemma":[0.0000022304985,0.000007970191,0.000017661305,0.0000015205777,0.0000016031152,0.0000037035113,0.0000043772534,0.9977608,0.000049632556,0.0019098265,0.0002390289,0.0000016872547],"about_ca_topic_score_codex":0.008521724,"about_ca_topic_score_gemma":0.0054946137,"teacher_disagreement_score":0.008521724,"about_ca_system_score_codex":0.0010485112,"about_ca_system_score_gemma":0.0013639767,"threshold_uncertainty_score":0.01694429},"labels":[],"label_agreement":null},{"id":"W2590167772","doi":"10.1109/pesgm.2017.8273922","title":"Load synchronization and sustained oscillations induced by transactive control","year":2017,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Synchronism; Synchronization (alternating current); Flexibility (engineering); Computer science; Control (management); Diversity (politics); Business; Environmental economics; Microeconomics; Economics; Telecommunications","score_opus":0.007647427055615301,"score_gpt":0.20997606737427338,"score_spread":0.20232864031865808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2590167772","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5104624,0.00021226062,0.4655723,0.0005505416,0.00008276854,0.00005928371,0.000059813618,0.00057765475,0.022422986],"genre_scores_gemma":[0.9973863,0.000021998123,0.0017527464,0.000024109919,0.000007658351,0.000009822645,0.000008224709,0.000011812176,0.0007772956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994974,0.00010828558,0.000033921962,0.00011061832,0.0001708011,0.00007887009],"domain_scores_gemma":[0.99831665,0.00073588704,0.00036769308,0.00026301685,0.0002391671,0.00007754872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066424685,0.00027158955,0.00035533548,0.00036131043,0.00033804777,0.0009209754,0.00056484964,0.00045102593,0.0022709796],"category_scores_gemma":[0.003567048,0.00016694287,0.00023650826,0.00029886403,0.0008822448,0.00084906036,0.0008319891,0.0006997465,0.00019803345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00094801997,0.00030735406,0.011295547,0.00021021652,0.00016525951,0.0024139076,0.002194859,0.5084479,0.12952843,0.21217336,0.0036962612,0.12861884],"study_design_scores_gemma":[0.00003808811,0.000115805946,0.0019644888,0.000009975373,0.000016622333,0.00025181533,0.00016614972,0.95693445,0.007476734,0.031210847,0.0017986591,0.000016334034],"about_ca_topic_score_codex":0.0013817279,"about_ca_topic_score_gemma":0.0007582678,"teacher_disagreement_score":0.0022709796,"about_ca_system_score_codex":0.00054998667,"about_ca_system_score_gemma":0.0002553675,"threshold_uncertainty_score":0.0075971484},"labels":[],"label_agreement":null},{"id":"W2592637384","doi":"10.1109/tsg.2017.2679702","title":"Aggregating a Large Number of Residential Appliances for Demand Response Applications","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Queueing theory; Computer science; Service (business); Operations research; Power demand; Peak demand; Dynamic demand; Duration (music); Order (exchange); Power consumption; Load management; Reliability engineering; Class (philosophy); Power (physics); Electricity; Computer network; Engineering; Business; Electrical engineering","score_opus":0.014877303082508469,"score_gpt":0.27471702253392605,"score_spread":0.2598397194514176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592637384","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14920038,0.00022568255,0.8442357,0.00035464432,0.00009784136,0.00016839724,0.00024441327,0.0012110064,0.0042618318],"genre_scores_gemma":[0.92280537,0.00011040298,0.07452334,0.00007522356,0.00006541884,0.000048736125,0.00024339517,0.00006431292,0.0020638048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950457,0.00013081837,0.000029179255,0.00012134346,0.00013506383,0.00007890888],"domain_scores_gemma":[0.9993144,0.00022116692,0.00006169338,0.0001966021,0.00016393169,0.00004218035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007506186,0.00060812867,0.00060616346,0.00030100122,0.0005593208,0.000619953,0.0009394976,0.0003976431,0.0020851435],"category_scores_gemma":[0.0013420269,0.00022932909,0.00039681117,0.00093884836,0.00019974151,0.00095880276,0.0005319164,0.00058690214,0.0004645727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032917087,0.0005490685,0.008803451,0.00016945816,0.00013069136,0.00042813158,0.00024718358,0.6495225,0.06623126,0.019362332,0.008812182,0.24541461],"study_design_scores_gemma":[0.000010453591,0.000061062754,0.0016233429,0.0000039185793,0.000022359876,0.00005894938,0.00007798814,0.9837082,0.0064614867,0.005388695,0.0025734503,0.000009983528],"about_ca_topic_score_codex":0.0046308762,"about_ca_topic_score_gemma":0.008644464,"teacher_disagreement_score":0.0046308762,"about_ca_system_score_codex":0.00079999556,"about_ca_system_score_gemma":0.0005519239,"threshold_uncertainty_score":0.009207845},"labels":[],"label_agreement":null},{"id":"W2592972005","doi":"10.1109/icwt.2016.7870860","title":"DC backup power supply monitoring in substation based on wireless sensor network","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Islam Indonesia; Universitas Indonesia; Canadian Patient Safety Institute","keywords":"Backup; Overcurrent; Wireless sensor network; Overvoltage; Transmitter; Computer science; Electrical engineering; Wireless; Power (physics); Engineering; Mains electricity; Battery (electricity); Real-time computing; Embedded system; Computer network; Telecommunications; Voltage; Operating system","score_opus":0.007716294231133454,"score_gpt":0.19511550749185838,"score_spread":0.18739921326072492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592972005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5286568,0.001178403,0.4557629,0.00039228922,0.00011708667,0.00013257994,0.00030952075,0.0019857287,0.011464796],"genre_scores_gemma":[0.9852255,0.00030178184,0.012755297,0.000025659552,0.000013593562,0.000027277381,0.00007938682,0.000009404003,0.0015621076],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99979395,0.000045221328,0.00001161629,0.000059561084,0.00007283184,0.000016902472],"domain_scores_gemma":[0.9998574,0.000027848671,0.000028767587,0.000011966684,0.000066101406,0.000007847239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013162776,0.0002585536,0.00020808022,0.00032922425,0.00015848834,0.00027631407,0.00028332853,0.00016128154,0.0005830934],"category_scores_gemma":[0.00024689437,0.000118004355,0.00010007631,0.0003056562,0.00008007899,0.0005082437,0.00019110576,0.00009634162,0.00013778411],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069102034,0.00024099345,0.04696977,0.00064617675,0.000108191794,0.0006973317,0.00044997103,0.08209098,0.3197604,0.003642137,0.0072255437,0.53747743],"study_design_scores_gemma":[0.00004284677,0.0005103539,0.02208489,0.000049025733,0.00010658699,0.00059263216,0.00025733843,0.8666562,0.09995746,0.0013799507,0.008330938,0.00003175274],"about_ca_topic_score_codex":0.00090098946,"about_ca_topic_score_gemma":0.001237447,"teacher_disagreement_score":0.00090098946,"about_ca_system_score_codex":0.00018156745,"about_ca_system_score_gemma":0.00013844088,"threshold_uncertainty_score":0.0019506216},"labels":[],"label_agreement":null},{"id":"W2596324651","doi":"","title":"On Reliability, Performance and Internet Power Consumption","year":2009,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Polytechnique Montréal","funders":"","keywords":"The Internet; Robustness (evolution); Computer science; Energy consumption; Power consumption; Reliability (semiconductor); Consumption (sociology); Power (physics); Engineering; World Wide Web","score_opus":0.006302571752656993,"score_gpt":0.1970840396433608,"score_spread":0.1907814678907038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2596324651","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.564904,0.019612744,0.32762688,0.009317315,0.00017623886,0.00007274347,0.00069007307,0.000431452,0.07716857],"genre_scores_gemma":[0.989737,0.0023062888,0.0052550966,0.00012351054,0.00016556661,0.000020504896,0.00008861103,0.000053987882,0.002249494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884653,0.0004218326,0.000045394678,0.00013268489,0.00041733342,0.00013616917],"domain_scores_gemma":[0.98565626,0.010706891,0.0016262761,0.000801593,0.0010288124,0.00018017611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017409879,0.0005628314,0.00040156275,0.0011837955,0.00024450192,0.0015196688,0.00046297436,0.0008197262,0.0015953097],"category_scores_gemma":[0.0127643,0.00022380013,0.00022466171,0.0015974987,0.0010078211,0.0019327813,0.0006132196,0.00071879657,0.00039999804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003130555,0.00023064693,0.04736581,0.00027392572,0.00017819885,0.0005548557,0.0005600213,0.60042554,0.009380914,0.1907762,0.0051427786,0.14479809],"study_design_scores_gemma":[0.000018864066,0.00024878388,0.041430082,0.00012818052,0.00007200046,0.0004949109,0.0002671301,0.7418464,0.0051769363,0.20103553,0.009201924,0.00007925219],"about_ca_topic_score_codex":0.0026257609,"about_ca_topic_score_gemma":0.002225443,"teacher_disagreement_score":0.0026257609,"about_ca_system_score_codex":0.00093367585,"about_ca_system_score_gemma":0.00036197135,"threshold_uncertainty_score":0.009207368},"labels":[],"label_agreement":null},{"id":"W2596567060","doi":"10.1016/j.apenergy.2017.03.023","title":"An analysis on the energy consumption of circulating pumps of residential swimming pools for peak load management","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Chinese Academy of Sciences","keywords":"Energy consumption; Environmental science; Work (physics); Efficient energy use; Energy (signal processing); Consumption (sociology); Sampling (signal processing); Energy management; Estimation; Computer science; Simulation; Statistics; Automotive engineering; Engineering; Mathematics; Telecommunications; Electrical engineering","score_opus":0.01564660501756535,"score_gpt":0.2346303442369015,"score_spread":0.21898373921933614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2596567060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98464084,0.00023604403,0.008926237,0.00008081054,0.000017446931,0.00003323373,0.00067255896,0.00009488776,0.005297924],"genre_scores_gemma":[0.9968732,0.00007725404,0.0006805689,0.0000071915515,0.000004245205,0.000011731251,0.00032845978,0.000014606198,0.0020027072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998104,0.000034406585,0.0000084972835,0.000036032077,0.000070274626,0.00004037449],"domain_scores_gemma":[0.99975544,0.000116175215,0.000014821171,0.000014307651,0.000088511006,0.0000107392925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023852258,0.00044193026,0.0003344386,0.00066628435,0.00030681238,0.00046553422,0.00032542035,0.00031285404,0.002793832],"category_scores_gemma":[0.00045639876,0.00018699176,0.00057088915,0.0009190623,0.00013623755,0.00050238846,0.00016492684,0.00017909422,0.00039486613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044901343,0.0005670849,0.19745824,0.00089081656,0.00052360294,0.0017187411,0.00083774066,0.47129056,0.090383366,0.0054095434,0.008050636,0.2183795],"study_design_scores_gemma":[0.000028588607,0.0005667629,0.31506082,0.000035677902,0.00029161407,0.0003032937,0.0011382786,0.64495635,0.030703591,0.0011724911,0.005687343,0.00005514078],"about_ca_topic_score_codex":0.007439473,"about_ca_topic_score_gemma":0.00939417,"teacher_disagreement_score":0.007439473,"about_ca_system_score_codex":0.0006605926,"about_ca_system_score_gemma":0.00035802906,"threshold_uncertainty_score":0.014792323},"labels":[],"label_agreement":null},{"id":"W2597941533","doi":"10.1109/tsg.2017.2686801","title":"Optimal Demand Response for Distribution Feeders With Existing Smart Loads","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Power Authority; Ontario Centres of Excellence","keywords":"Smart grid; Thermostat; Demand response; Load management; Context (archaeology); Grid; Engineering; Automotive engineering; Peak demand; Computer science; Reliability engineering; Control engineering; Electrical engineering; Electricity","score_opus":0.022595995126074377,"score_gpt":0.24580697934773374,"score_spread":0.22321098422165936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2597941533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62599486,0.00012165815,0.3575254,0.00039569367,0.00003541815,0.000115399576,0.00019414941,0.0005013778,0.015115961],"genre_scores_gemma":[0.99626094,0.000011262654,0.0029131793,0.000012665514,0.0000021248516,0.000011576101,0.00002323463,0.000007776053,0.0007572848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980265,0.000053701457,0.0000064549477,0.00004198054,0.00003620174,0.000059072903],"domain_scores_gemma":[0.999629,0.00020356325,0.00005879037,0.000015780175,0.00007051562,0.000022274504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032778925,0.00048709183,0.00033265533,0.00017370009,0.00022538991,0.00049552484,0.00030533932,0.00039035504,0.0014104942],"category_scores_gemma":[0.00092280115,0.00023833777,0.00018886712,0.00013170874,0.00030140497,0.00039816185,0.00028171882,0.00043754958,0.00013365889],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010440584,0.000050868977,0.00067557435,0.00002072266,0.000008913045,0.000027124845,0.000024414514,0.98841,0.0020406009,0.000832207,0.0002819256,0.0075232163],"study_design_scores_gemma":[0.00000787014,0.00001958464,0.00019305047,7.3069924e-7,0.0000021703777,0.000002324577,0.0000070583546,0.9990497,0.0003456367,0.00029142553,0.00007862897,0.0000017532009],"about_ca_topic_score_codex":0.014654432,"about_ca_topic_score_gemma":0.017324423,"teacher_disagreement_score":0.014654432,"about_ca_system_score_codex":0.0010621789,"about_ca_system_score_gemma":0.0005575776,"threshold_uncertainty_score":0.029138267},"labels":[],"label_agreement":null},{"id":"W2599564054","doi":"10.18034/ei.v4i2.188","title":"A Way to Unlock The Electricity Energy Market for The Common People Using CP Model","year":2016,"lang":"en","type":"article","venue":"Engineering International","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electricity; Electricity market; Business; Electrical engineering; Engineering","score_opus":0.009301680969105448,"score_gpt":0.20305781377522544,"score_spread":0.19375613280612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599564054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032073177,0.0006308259,0.5543243,0.013435584,0.0006480957,0.00033373758,0.000294586,0.000674793,0.3975849],"genre_scores_gemma":[0.7728773,0.0014544621,0.11432835,0.0019818675,0.000471826,0.0004714713,0.00034466188,0.00025554895,0.10781452],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991228,0.00025284252,0.00002905068,0.00017990108,0.00029307738,0.00012225732],"domain_scores_gemma":[0.99947196,0.00012642534,0.000056257722,0.00008900429,0.00015166283,0.00010477201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008071601,0.00037488193,0.0003903485,0.000623145,0.0011339756,0.0029182618,0.0012797255,0.0017659602,0.021768302],"category_scores_gemma":[0.0017994316,0.00019979312,0.000888672,0.0008104742,0.0011582401,0.0073191994,0.0019536074,0.0024874406,0.0025163456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041887288,0.00008117151,0.00054011145,0.00006552352,0.0000104917835,0.00024947827,0.0001937107,0.004053095,0.0008334152,0.95818084,0.008482869,0.027267436],"study_design_scores_gemma":[0.000084112806,0.00014604861,0.0005915414,0.000102856065,0.000031509888,0.00048816064,0.0005578541,0.09382284,0.0017673154,0.7405155,0.16183662,0.000055629847],"about_ca_topic_score_codex":0.0037924987,"about_ca_topic_score_gemma":0.0024939824,"teacher_disagreement_score":0.021768302,"about_ca_system_score_codex":0.001224094,"about_ca_system_score_gemma":0.001825445,"threshold_uncertainty_score":0.07282221},"labels":[],"label_agreement":null},{"id":"W2600712084","doi":"10.1109/tsg.2017.2688486","title":"On the Performance of Distributed and Cloud-Based Demand Response in Smart Grid","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Demand response; Cloud computing; Computer network; Distributed computing; Smart grid; Bandwidth (computing); Wireless; Channel (broadcasting); Telecommunications; Engineering","score_opus":0.012190506972195255,"score_gpt":0.2111215584021995,"score_spread":0.19893105143000425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600712084","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93260616,0.0005853989,0.054971416,0.00081222487,0.000075958415,0.00005659336,0.00012382198,0.00048304145,0.01028538],"genre_scores_gemma":[0.99771464,0.00004843884,0.0019422418,0.00001648223,0.0000042526235,0.000005591322,0.000026405454,0.00001041481,0.00023152115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867684,0.0005347119,0.00005310896,0.00014856968,0.0003004684,0.00028624534],"domain_scores_gemma":[0.99454534,0.0038376863,0.00028933378,0.0004305539,0.0007013115,0.00019592264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024516422,0.00054715946,0.00064017694,0.0003404774,0.0005677406,0.0009932833,0.00067212764,0.0005989707,0.0011877579],"category_scores_gemma":[0.0064554107,0.00016578281,0.00023406619,0.0006048085,0.00051845046,0.0011209068,0.0006543657,0.000582307,0.00014652165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083604007,0.00026971466,0.0034889346,0.000066857945,0.000026401189,0.000047900754,0.000042366064,0.96609145,0.0033489761,0.0039897184,0.0008353889,0.020956146],"study_design_scores_gemma":[0.000012232789,0.00008249935,0.00060045917,0.0000018382926,0.0000046912414,0.000007687471,0.000030473104,0.9975667,0.0011926335,0.00043039754,0.000067336,0.0000029926323],"about_ca_topic_score_codex":0.014702197,"about_ca_topic_score_gemma":0.0071155545,"teacher_disagreement_score":0.014702197,"about_ca_system_score_codex":0.0019598596,"about_ca_system_score_gemma":0.0009550019,"threshold_uncertainty_score":0.029233277},"labels":[],"label_agreement":null},{"id":"W2601847920","doi":"","title":"An Experimental Study on Load-Peak Shaving in Smart Homes by Means of Online Admission Control","year":2012,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Architecture; Smart grid; Scheduling (production processes); Computer science; Building management system; Demand response; Home automation; Load management; Peaking power plant; Embedded system; Real-time computing; Distributed computing; Electric power system; Engineering; Control (management); Power (physics); Electricity; Operating system","score_opus":0.009337651553762278,"score_gpt":0.2401665862362022,"score_spread":0.23082893468243992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2601847920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9887089,0.000020071346,0.00960417,0.000037133974,0.00002818228,0.00008553656,0.000058248927,0.00029103365,0.0011666953],"genre_scores_gemma":[0.9963236,0.000011851164,0.0030363656,0.000010981565,0.000006278614,0.000048176204,0.0000362592,0.000012329538,0.00051421754],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993742,0.0001859363,0.00002828418,0.00012535987,0.00015286055,0.00013349109],"domain_scores_gemma":[0.9985852,0.000689395,0.00011634818,0.00026788484,0.00019612075,0.0001450319],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006157347,0.00049055193,0.0005719463,0.00026828863,0.00041396695,0.0004225572,0.000744661,0.00050127844,0.00375209],"category_scores_gemma":[0.0017482868,0.00018986056,0.0002215091,0.00020794297,0.00068870944,0.0005688751,0.00047020408,0.0006531037,0.0003324185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.013454661,0.024138503,0.022362132,0.0010940047,0.00023682583,0.0013448943,0.0022203694,0.18867648,0.5754852,0.008812907,0.0029385479,0.15923543],"study_design_scores_gemma":[0.0012771682,0.015024595,0.019175574,0.000032784345,0.00010864126,0.00026249635,0.00089213485,0.61028486,0.34668696,0.0027191287,0.0034465424,0.00008908642],"about_ca_topic_score_codex":0.00142342,"about_ca_topic_score_gemma":0.0009679635,"teacher_disagreement_score":0.00375209,"about_ca_system_score_codex":0.00035272315,"about_ca_system_score_gemma":0.00033977712,"threshold_uncertainty_score":0.012551963},"labels":[],"label_agreement":null},{"id":"W2602184558","doi":"","title":"Gestion de stockage d'energie thermique d'un parc de chauffe-eaux par une commande a champ moyen","year":2016,"lang":"fr","type":"article","venue":"PhDT","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Art; Physics","score_opus":0.011780671475193431,"score_gpt":0.2108382235817056,"score_spread":0.19905755210651216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2602184558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7663301,0.00035706238,0.21002644,0.00043823587,0.0001440355,0.000083019644,0.0005915866,0.002860962,0.019168457],"genre_scores_gemma":[0.9801296,0.000092588605,0.013706546,0.00003528005,0.0000093113385,0.00005054501,0.00018943113,0.00015744883,0.005629148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998,0.000023754621,0.000006041439,0.00005882432,0.00008299895,0.000028361692],"domain_scores_gemma":[0.99966025,0.00015603848,0.000030422647,0.000036136018,0.0000913765,0.000025767928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003031852,0.00047717523,0.00037892713,0.00039207315,0.00041066646,0.0012217485,0.0004943791,0.0006089743,0.007876655],"category_scores_gemma":[0.0008771557,0.00033517592,0.00041844015,0.00034936698,0.00037677793,0.00083704805,0.0004469621,0.00049645104,0.00091126165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013664365,0.00016766711,0.02111949,0.00033942473,0.00010711523,0.00054052053,0.0013064175,0.4508467,0.3956379,0.0072838496,0.0035249242,0.11775954],"study_design_scores_gemma":[0.00006622085,0.0004972028,0.026114201,0.00005569222,0.000057136105,0.00014037683,0.00053668977,0.798706,0.15542732,0.0053106737,0.012964098,0.00012439558],"about_ca_topic_score_codex":0.0050985795,"about_ca_topic_score_gemma":0.0037102709,"teacher_disagreement_score":0.007876655,"about_ca_system_score_codex":0.0006499902,"about_ca_system_score_gemma":0.00046398677,"threshold_uncertainty_score":0.026350081},"labels":[],"label_agreement":null},{"id":"W2604466268","doi":"10.1109/tetc.2017.2692098","title":"Mining Energy Consumption Behavior Patterns for Households in Smart Grid","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Emerging Topics in Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Energy consumption; Smart grid; Context (archaeology); Consumption (sociology); Interdependence; Big data; Smart meter; Energy management; Energy (signal processing); Data mining; Engineering","score_opus":0.03922780463775764,"score_gpt":0.27797375832551197,"score_spread":0.2387459536877543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604466268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96027994,0.00019608508,0.031990312,0.00038037362,0.000017514765,0.0000879419,0.005239321,0.00077506056,0.0010333052],"genre_scores_gemma":[0.96955085,0.000116269985,0.02339908,0.000030082692,0.000008363594,0.000055298886,0.0062337248,0.000018437137,0.0005879007],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997043,0.00005492003,0.000041596122,0.00010543312,0.000054562268,0.00003913434],"domain_scores_gemma":[0.9995421,0.00015776645,0.00009777424,0.00008846199,0.00008291221,0.00003091438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030419277,0.00033906978,0.00039324537,0.0016370519,0.00023104735,0.00038627858,0.00041994784,0.00038998772,0.0006525239],"category_scores_gemma":[0.0014585194,0.00015935847,0.00041369454,0.0019556426,0.00010877942,0.0006530673,0.0003154628,0.00027656078,0.00034123566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053127494,0.0007569476,0.6122247,0.00030069068,0.00032286425,0.0009292058,0.0005875515,0.05897289,0.011532801,0.0016533762,0.007720645,0.304467],"study_design_scores_gemma":[0.00003225626,0.00013541206,0.22412635,0.00003885145,0.00008652515,0.00059490436,0.0013676578,0.75565094,0.008217207,0.0044385977,0.0052861455,0.000025137568],"about_ca_topic_score_codex":0.00669177,"about_ca_topic_score_gemma":0.015618374,"teacher_disagreement_score":0.00669177,"about_ca_system_score_codex":0.0003480306,"about_ca_system_score_gemma":0.00038666412,"threshold_uncertainty_score":0.013305664},"labels":[],"label_agreement":null},{"id":"W2604523575","doi":"10.1109/tac.2018.2800796","title":"Sufficient Conditions for the Value Function and Optimal Strategy to be Even and Quasi-Convex","year":2018,"lang":"en","type":"preprint","venue":"IEEE Transactions on Automatic Control","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bellman equation; Markov decision process; Monotone polygon; Mathematical optimization; Function (biology); Value (mathematics); Convex function; Regular polygon; Mathematics; State space; Convex optimization; Markov process; Computer science; Statistics","score_opus":0.015313723855022762,"score_gpt":0.23737008428373355,"score_spread":0.2220563604287108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604523575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07309645,0.000563559,0.8956652,0.0027526626,0.00019509801,0.0002669877,0.0011580503,0.0003092596,0.025992673],"genre_scores_gemma":[0.83692056,0.0014669015,0.15073435,0.00095187296,0.00036375842,0.0012571963,0.0014834888,0.00030786966,0.0065140277],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9955448,0.0013228913,0.00040223947,0.0008498729,0.0009744497,0.0009056937],"domain_scores_gemma":[0.9586171,0.029187461,0.0035766093,0.0015790601,0.005491576,0.0015482318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068353624,0.0015217707,0.0018170375,0.0020232883,0.00090093754,0.0029476942,0.0013837604,0.0019338524,0.009054605],"category_scores_gemma":[0.038042977,0.0009653447,0.0020097184,0.0010270546,0.0045599453,0.0069476366,0.002795231,0.0045341467,0.0014169114],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010785207,0.00013495777,0.0013615304,0.00024744155,0.00006206585,0.00045243095,0.00035736265,0.04286903,0.0044208067,0.93732125,0.0033883543,0.009276913],"study_design_scores_gemma":[0.000071347655,0.00013881252,0.001103253,0.00015742125,0.000037148067,0.0002952234,0.00029395314,0.23613556,0.0030416711,0.7542431,0.004403685,0.00007887936],"about_ca_topic_score_codex":0.0016509176,"about_ca_topic_score_gemma":0.0012310229,"teacher_disagreement_score":0.009054605,"about_ca_system_score_codex":0.0018616397,"about_ca_system_score_gemma":0.004847666,"threshold_uncertainty_score":0.036149263},"labels":[],"label_agreement":null},{"id":"W2605290472","doi":"10.18280/mmep.040112","title":"DMFC water management in presence of heat sources","year":2017,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Environmental science","score_opus":0.019023825544728964,"score_gpt":0.19620102608710874,"score_spread":0.1771772005423798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605290472","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.941247,0.0010082338,0.03494911,0.00045651267,0.00011700027,0.00007312744,0.00044413423,0.0002180764,0.021486819],"genre_scores_gemma":[0.9905758,0.0002533961,0.0062057637,0.000018821669,0.00000752903,0.000031700278,0.00009784321,0.000012624588,0.0027964383],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998863,0.000012656033,0.000004503778,0.000024760555,0.000047232894,0.000024611649],"domain_scores_gemma":[0.99986935,0.000047578033,0.000020612262,0.000015635022,0.00003677429,0.000009937257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020562965,0.00019506647,0.0005242112,0.00021173834,0.00047124492,0.00051084725,0.00032627585,0.000458005,0.0014008665],"category_scores_gemma":[0.0004334546,0.00007575767,0.00023563384,0.00041059582,0.0003252646,0.00042034016,0.00030585384,0.00032748593,0.00016757986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068492576,0.00031220508,0.0048838584,0.00065160164,0.000037552083,0.0007607304,0.00030093238,0.6128612,0.32147983,0.013215606,0.0021050212,0.042706598],"study_design_scores_gemma":[0.00004645568,0.0002901098,0.0021727164,0.000020622074,0.000021547887,0.00008944845,0.00012761765,0.8068005,0.1830083,0.0016545391,0.00574523,0.000022967857],"about_ca_topic_score_codex":0.0044008526,"about_ca_topic_score_gemma":0.002053287,"teacher_disagreement_score":0.0044008526,"about_ca_system_score_codex":0.00056750176,"about_ca_system_score_gemma":0.00042904832,"threshold_uncertainty_score":0.008750439},"labels":[],"label_agreement":null},{"id":"W2606581894","doi":"10.18260/1-2--22566","title":"The Design of a Wi-Fi Enabled Cloud Monitoring Device","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cloud computing; Computer science; Server; Metering mode; Embedded system; Real-time computing; Computer network; Engineering; Operating system","score_opus":0.03196947016710757,"score_gpt":0.2061475935076629,"score_spread":0.17417812334055532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606581894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065581754,0.0007635094,0.8862159,0.0013641051,0.0005786104,0.001744272,0.00053192367,0.0023618306,0.040858142],"genre_scores_gemma":[0.56650174,0.000711354,0.3983031,0.00078266475,0.000106197476,0.001074216,0.00031171128,0.00009041419,0.032118533],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99958676,0.000052334723,0.000026760465,0.00011088076,0.00016881018,0.000054339376],"domain_scores_gemma":[0.99983525,0.000022452383,0.000025280631,0.000022583248,0.00007118218,0.000023300383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022986805,0.00045397546,0.0003732325,0.0003805272,0.00057490537,0.0010062654,0.0014406177,0.0009954125,0.0023703363],"category_scores_gemma":[0.0003635109,0.00030338962,0.00033552715,0.00025320755,0.00030845864,0.0006653833,0.00052449084,0.00044249467,0.0012597129],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006950774,0.0003539528,0.0076144133,0.0012777385,0.00012133103,0.0027784992,0.0006909645,0.025107652,0.5736359,0.04728672,0.01777608,0.32266176],"study_design_scores_gemma":[0.00023127471,0.0027879677,0.011766347,0.00032345753,0.00024408431,0.00510033,0.000355416,0.2845158,0.40839085,0.0044923415,0.28155717,0.00023495774],"about_ca_topic_score_codex":0.0011958377,"about_ca_topic_score_gemma":0.0010168905,"teacher_disagreement_score":0.0023703363,"about_ca_system_score_codex":0.00060941355,"about_ca_system_score_gemma":0.0007022414,"threshold_uncertainty_score":0.0079295635},"labels":[],"label_agreement":null},{"id":"W2611511120","doi":"10.5539/jms.v7n4p16","title":"Financial Viability of Residential Photovoltaic and Battery Systems in Californias","year":2017,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Battery (electricity); Electricity; Photovoltaics; Payback period; Benchmark (surveying); Tariff; Computer science; Environmental economics; Computation; Finance; Automotive engineering; Reliability engineering; Economics; Environmental science; Business; Electrical engineering; Engineering; Power (physics); Microeconomics; Production (economics)","score_opus":0.00574765949606628,"score_gpt":0.2119456508129835,"score_spread":0.2061979913169172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611511120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98233783,0.00051004236,0.0014408719,0.0009391834,0.000017941398,0.000025678772,0.0020253693,0.00007929346,0.012623803],"genre_scores_gemma":[0.9975477,0.00014687027,0.00056297,0.000027568909,0.0000047971494,0.000008687419,0.00063255837,0.000007158865,0.0010617936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941146,0.0001393591,0.000026443653,0.000109671986,0.0002049214,0.000108142325],"domain_scores_gemma":[0.998184,0.0010137415,0.00026530647,0.00008250838,0.00034653876,0.00010789421],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011409139,0.00034536692,0.0003948633,0.0007102063,0.00054169114,0.001889517,0.00085473404,0.00062875374,0.0024847824],"category_scores_gemma":[0.0042727725,0.00036844684,0.00040802485,0.0011929128,0.00048857264,0.0012320863,0.0005254428,0.0007367153,0.00011721852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001869164,0.00015358221,0.040920276,0.00010045968,0.00006728907,0.000332699,0.00009017755,0.92762893,0.0006039394,0.013125538,0.0049379473,0.011852085],"study_design_scores_gemma":[0.000059797163,0.0001935884,0.048066832,0.00004386037,0.00006742638,0.00011991669,0.0005912988,0.93953395,0.00097506266,0.005723093,0.0045542354,0.00007095585],"about_ca_topic_score_codex":0.15556602,"about_ca_topic_score_gemma":0.13065398,"teacher_disagreement_score":0.15556602,"about_ca_system_score_codex":0.004933552,"about_ca_system_score_gemma":0.0019520071,"threshold_uncertainty_score":0.3093211},"labels":[],"label_agreement":null},{"id":"W2611819112","doi":"","title":"Pipeline Optimization Using DRA Degradation Models","year":2015,"lang":"en","type":"article","venue":"PSIG Annual Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Pipeline (software); Degradation (telecommunications); Environmental science; Petroleum engineering; Computer science; Geology; Telecommunications","score_opus":0.03978984286566662,"score_gpt":0.23348487234388413,"score_spread":0.1936950294782175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611819112","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06250697,0.00080778403,0.8920148,0.000989402,0.00011829463,0.00012541917,0.00075782277,0.0018182725,0.04086112],"genre_scores_gemma":[0.93209094,0.00036148322,0.048601825,0.00011269267,0.000034517463,0.000116098185,0.0004299264,0.0003146786,0.017937757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997899,0.00007089016,0.000007857006,0.000044260843,0.00004813839,0.000038967268],"domain_scores_gemma":[0.9995023,0.00024589355,0.00004691797,0.000037144062,0.00014333874,0.000024415327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000558559,0.00079029665,0.0010535853,0.000545973,0.0004091413,0.0010413677,0.00071897334,0.0011337347,0.0050922707],"category_scores_gemma":[0.0016274715,0.0005888801,0.00083877344,0.0007034822,0.00032845928,0.0011326397,0.0006072547,0.0010074851,0.0006913069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011925056,0.000006344666,0.00005320436,0.000011477647,0.0000041436997,0.000006896469,0.0000034414059,0.9955349,0.0001871508,0.0009591867,0.0002747994,0.0029465652],"study_design_scores_gemma":[0.0000012517426,0.0000037976074,0.000013621924,8.39664e-7,0.0000011727819,9.637248e-7,0.0000011021449,0.99946314,0.00006695783,0.0003137112,0.00013270958,7.670766e-7],"about_ca_topic_score_codex":0.018530397,"about_ca_topic_score_gemma":0.011447377,"teacher_disagreement_score":0.018530397,"about_ca_system_score_codex":0.0015559285,"about_ca_system_score_gemma":0.0013513635,"threshold_uncertainty_score":0.036845088},"labels":[],"label_agreement":null},{"id":"W2612224301","doi":"10.1109/icit.2017.7915432","title":"Taylor series approximation of ZIP model for on-line estimation of residential loads' parameters","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Taylor series; Voltage; Series (stratigraphy); AC power; Line (geometry); Representation (politics); Electric power system; Computer science; Polynomial; Control theory (sociology); Range (aeronautics); Power (physics); Voltage optimisation; Estimation theory; Mathematical optimization; Mathematics; Algorithm; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.037229198376109905,"score_gpt":0.2625621470602051,"score_spread":0.22533294868409517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612224301","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009584527,0.00013026026,0.98841596,0.00004202698,0.000021369058,0.000016519973,0.000046791087,0.0003520514,0.0013905285],"genre_scores_gemma":[0.8849143,0.00083300966,0.10817085,0.00006886593,0.00006634916,0.000118624586,0.00031724008,0.00015574302,0.0053550154],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996754,0.00010347836,0.000013220823,0.0000635268,0.0001165563,0.000027892691],"domain_scores_gemma":[0.9997075,0.00012949543,0.000041679883,0.000037445076,0.00007666718,0.000007130016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039657936,0.0006601152,0.0005538574,0.00034479072,0.00022999542,0.00048755706,0.000715257,0.00064140477,0.0014056707],"category_scores_gemma":[0.0012636116,0.00023970536,0.000645072,0.0005798383,0.00030251045,0.000838646,0.00031199027,0.0008778174,0.0008336818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090467285,0.000039714698,0.0010914156,0.00014636085,0.000035580273,0.00017812886,0.000117103176,0.90547067,0.013112604,0.0077736704,0.0016156257,0.07032869],"study_design_scores_gemma":[0.0000012848213,0.0000124502485,0.00009713946,0.0000025148431,0.000003420307,0.000025205542,0.000005866108,0.9982572,0.00074556196,0.00051281817,0.00033311936,0.0000032695084],"about_ca_topic_score_codex":0.004351345,"about_ca_topic_score_gemma":0.0029382703,"teacher_disagreement_score":0.004351345,"about_ca_system_score_codex":0.00038159298,"about_ca_system_score_gemma":0.0003922633,"threshold_uncertainty_score":0.008652031},"labels":[],"label_agreement":null},{"id":"W2612421670","doi":"10.1016/j.ijepes.2017.10.019","title":"On bilevel planning of advanced microgrids","year":2017,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Microgrid; Mathematical optimization; Investment (military); Computer science; Operations research; Energy (signal processing); Comprehensive planning; Energy planning; Optimization problem; Engineering; Control (management); Mathematics; Renewable energy; Civil engineering","score_opus":0.009362997844748894,"score_gpt":0.25035607463857446,"score_spread":0.24099307679382556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612421670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027772864,0.000918735,0.95525914,0.0006072033,0.00010534458,0.00007112286,0.00019094403,0.00017026847,0.014904288],"genre_scores_gemma":[0.8042303,0.0013688983,0.18441093,0.00017674048,0.00008912507,0.00018454978,0.00035514325,0.00019113191,0.008993157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949086,0.00023437139,0.000025241936,0.000076844524,0.000086414606,0.00008628902],"domain_scores_gemma":[0.99848974,0.0010352295,0.000090350135,0.00007971592,0.00021693019,0.00008806473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012512524,0.0011088965,0.0018938249,0.0007745871,0.00063610874,0.0020208354,0.0011480231,0.0010365329,0.006134594],"category_scores_gemma":[0.005391692,0.00091763603,0.000929783,0.0015916562,0.0011335814,0.0019054227,0.0022414182,0.0017036704,0.0005094359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029654031,0.000010595677,0.00013058093,0.000039242856,0.000011738238,0.00002353111,0.00003100877,0.97623754,0.000069782705,0.014802588,0.00037773838,0.008235912],"study_design_scores_gemma":[0.0000057881693,0.000013544214,0.000022798142,0.000011488677,0.0000034943614,0.0000056581753,0.000019350118,0.9724644,0.000059288148,0.026911508,0.00047944052,0.0000032038613],"about_ca_topic_score_codex":0.009678398,"about_ca_topic_score_gemma":0.009296441,"teacher_disagreement_score":0.009678398,"about_ca_system_score_codex":0.00087991473,"about_ca_system_score_gemma":0.0011197388,"threshold_uncertainty_score":0.020522296},"labels":[],"label_agreement":null},{"id":"W2612838918","doi":"10.1109/icei.2017.57","title":"A Distributed Optimal Load Control Model for Heterogeneous Homes Responding to Time of Use","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Payment; Benchmark (surveying); Control (management); Computer science; Demand response; Load management; Load profile; Energy management; Software; Energy management system; Stability (learning theory); Load shifting; Operations research; Energy (signal processing); Engineering; Operating system","score_opus":0.017224411906123678,"score_gpt":0.23380787349039842,"score_spread":0.21658346158427474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612838918","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05277748,0.00012354419,0.93193835,0.0006063396,0.000084435866,0.00012750895,0.00021701568,0.00048470031,0.013640644],"genre_scores_gemma":[0.9726846,0.000103730694,0.015557394,0.00009710198,0.000033167064,0.00021394803,0.0001218752,0.000047964928,0.0111401575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993325,0.00013575645,0.000027463166,0.00023541143,0.00014593684,0.00012287157],"domain_scores_gemma":[0.99940574,0.00023548618,0.00011686051,0.000030631207,0.0001725422,0.000038728416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009187878,0.0009975904,0.001164438,0.00038828776,0.00068405987,0.0014424936,0.0017140042,0.0013958518,0.0042496044],"category_scores_gemma":[0.0014821,0.0005474023,0.0008156512,0.00043608074,0.0009514404,0.00098937,0.0009842376,0.0012589529,0.00048741038],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022063994,0.00001838782,0.00013855792,0.000009287602,0.0000072624703,0.00002889769,0.000020495654,0.99551636,0.0003988714,0.0020871132,0.00018439951,0.0015683632],"study_design_scores_gemma":[0.0000048786314,0.0000073108736,0.000034094,6.213792e-7,0.0000024370706,0.0000020065634,0.0000034741006,0.99939966,0.00004913719,0.000423036,0.000071524264,0.0000017118616],"about_ca_topic_score_codex":0.022978468,"about_ca_topic_score_gemma":0.014851518,"teacher_disagreement_score":0.022978468,"about_ca_system_score_codex":0.0016416447,"about_ca_system_score_gemma":0.0014217733,"threshold_uncertainty_score":0.045689404},"labels":[],"label_agreement":null},{"id":"W2612850393","doi":"10.15173/esr.v19i1.534","title":"HOUSEHOLD PREFERENCES FOR TIME-OF-USE RATES IN THE PORTUGUESE ELECTRICITY MARKET","year":2012,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Quantile regression; Electricity; Consumption (sociology); Portuguese; Economics; Econometrics; Electricity market; Logit; Ordered logit; Nested logit; Logistic regression; Consumer behaviour; Microeconomics; Business; Marketing; Statistics; Mathematics","score_opus":0.058631422824355704,"score_gpt":0.2749631069821777,"score_spread":0.21633168415782197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612850393","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98744595,0.0011909802,0.0010160806,0.00031140138,0.000007726311,0.00000728302,0.00012668515,0.0000030350939,0.0098908385],"genre_scores_gemma":[0.99875677,0.00050931604,0.00011700524,0.000016172744,0.000008106219,0.0000016500996,0.00004076279,0.0000014800132,0.00054871215],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993799,0.00039658576,0.000021497202,0.000045577897,0.00010254197,0.00005397206],"domain_scores_gemma":[0.9979096,0.0013896197,0.00048024475,0.00007785384,0.00008177762,0.000060897048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011251406,0.00009623428,0.00025116524,0.0003337977,0.00015895479,0.0010861165,0.00019336006,0.0003364907,0.0030634343],"category_scores_gemma":[0.003248902,0.00007422742,0.00021756682,0.0006438083,0.00022693862,0.000595373,0.00015794825,0.00020767468,0.00021597641],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020436144,0.0008099902,0.7133992,0.00047683035,0.00040775503,0.0027531409,0.0065449695,0.018989757,0.004936277,0.047657836,0.002953996,0.1990267],"study_design_scores_gemma":[0.000046782006,0.0004050959,0.9517427,0.00016127304,0.00009840812,0.0010005954,0.006970592,0.016240548,0.0008385057,0.010593227,0.01185745,0.000044854864],"about_ca_topic_score_codex":0.0027916834,"about_ca_topic_score_gemma":0.005103035,"teacher_disagreement_score":0.0030634343,"about_ca_system_score_codex":0.0003252761,"about_ca_system_score_gemma":0.00012684584,"threshold_uncertainty_score":0.010248244},"labels":[],"label_agreement":null},{"id":"W2613477346","doi":"","title":"Standby and Off-Mode Energy Losses In New Appliances Measured in Shops","year":2010,"lang":"en","type":"preprint","venue":"Virtual Community of Pathological Anatomy (University of Castilla La Mancha)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intertek (Canada)","funders":"","keywords":"Standby power; Mode (computer interface); Computer science; Environmental science; Business; Engineering; Electrical engineering; Operating system","score_opus":0.02010470168512051,"score_gpt":0.22186470545815615,"score_spread":0.20176000377303563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2613477346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9683169,0.0015175852,0.014075,0.000060113944,0.00014350728,0.00009521487,0.003500088,0.00045501124,0.011836619],"genre_scores_gemma":[0.9831352,0.00067074905,0.004593928,0.000045269408,0.000040525247,0.00007149561,0.0047948463,0.00017278038,0.006475061],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99855417,0.00014645647,0.000056673427,0.00023325266,0.00089290726,0.000116541996],"domain_scores_gemma":[0.9989911,0.00022520703,0.00014336724,0.00014681651,0.00044719264,0.000046383633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090975827,0.0006876843,0.0007498089,0.0019903905,0.00029182684,0.0009486118,0.0006060168,0.00045937463,0.001660679],"category_scores_gemma":[0.0012152628,0.00021099728,0.00063871185,0.0012698711,0.00035589756,0.0008596514,0.0007705703,0.00042585435,0.0013248136],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030630832,0.0009965637,0.3253247,0.0023498626,0.00067633286,0.0023015183,0.0038421815,0.017574664,0.15646318,0.0017134565,0.016934112,0.4687604],"study_design_scores_gemma":[0.000052603846,0.0015639734,0.78987026,0.00026310302,0.0002671273,0.0020552063,0.0030393628,0.012531271,0.14588517,0.00077586283,0.043562446,0.00013364082],"about_ca_topic_score_codex":0.0007146523,"about_ca_topic_score_gemma":0.0009896476,"teacher_disagreement_score":0.0019903905,"about_ca_system_score_codex":0.00030651444,"about_ca_system_score_gemma":0.000117876814,"threshold_uncertainty_score":0.0055555105},"labels":[],"label_agreement":null},{"id":"W2614026174","doi":"10.1109/icit.2017.7915420","title":"A semi-synthetic dataset development tool for household energy consumption analysis","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Probabilistic logic; Energy consumption; Power consumption; Energy management; Electric power; Key (lock); Energy management system; Energy (signal processing); Reliability engineering; Systems engineering; Power (physics); Data mining; Engineering; Artificial intelligence; Computer security","score_opus":0.03591394313670532,"score_gpt":0.23890325092699663,"score_spread":0.2029893077902913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2614026174","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08718489,0.00026064957,0.56769085,0.0005681844,0.00044717963,0.001260592,0.29494256,0.041668776,0.005976362],"genre_scores_gemma":[0.17984618,0.00017911769,0.4078279,0.00016051259,0.000053692325,0.0022895534,0.40730813,0.0009856914,0.0013492632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992893,0.0002644346,0.000100152254,0.0001605003,0.0001473189,0.000038195823],"domain_scores_gemma":[0.997581,0.0010745786,0.00016532371,0.0006883471,0.00040691224,0.000083766805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017464544,0.0009383914,0.0004224966,0.001742228,0.00032095183,0.000762145,0.0014578368,0.0006747015,0.004045598],"category_scores_gemma":[0.0057952907,0.00028158538,0.0010376495,0.0016862699,0.00019480348,0.0008657434,0.0009028216,0.00097574363,0.0016904789],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010221581,0.0014566265,0.04608148,0.0017016467,0.0007593737,0.0009559283,0.00049683463,0.42095524,0.015151656,0.014385803,0.21684794,0.2801853],"study_design_scores_gemma":[0.00013320304,0.00018527727,0.013706122,0.000080165824,0.00005041123,0.0003014438,0.00029047974,0.89418584,0.011508523,0.0069826925,0.07249739,0.00007836235],"about_ca_topic_score_codex":0.0034835038,"about_ca_topic_score_gemma":0.005478822,"teacher_disagreement_score":0.004045598,"about_ca_system_score_codex":0.00043038247,"about_ca_system_score_gemma":0.00075920846,"threshold_uncertainty_score":0.01353389},"labels":[],"label_agreement":null},{"id":"W2615310803","doi":"10.3390/data3010008","title":"RAE: The Rainforest Automation Energy Dataset for Smart Grid Meter Data Analysis","year":2018,"lang":"en","type":"article","venue":"Data","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Thermostat; Smart meter; Smart grid; Automation; Electricity meter; Computer science; Test data; Real-time computing; Energy (signal processing); Electricity; Engineering; Power (physics); Electrical engineering","score_opus":0.059184727489375526,"score_gpt":0.2833796318320338,"score_spread":0.22419490434265826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2615310803","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025208224,0.00031464183,0.0034723624,0.00072299637,0.00017351516,0.00021607679,0.95799977,0.007145436,0.004747053],"genre_scores_gemma":[0.020317148,0.000096426134,0.006290035,0.000110913104,0.000031593052,0.00017355662,0.9717103,0.00023647475,0.0010334792],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99915624,0.00013047543,0.000105403364,0.00015693902,0.00033475086,0.00011626791],"domain_scores_gemma":[0.99861896,0.00023030248,0.00015321495,0.00044148948,0.00044151687,0.000114547904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009547158,0.0012595868,0.00076384784,0.0020539693,0.0005506914,0.0008721706,0.0016709992,0.0013615238,0.0053666164],"category_scores_gemma":[0.0030283185,0.00033020938,0.000850958,0.0031714449,0.00030607698,0.0010791621,0.0010133991,0.0013291149,0.0057864864],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003192901,0.00038007868,0.01381166,0.0005090847,0.00015600011,0.00024867343,0.00011925076,0.010290094,0.0027339514,0.0015085497,0.9405478,0.029375484],"study_design_scores_gemma":[0.0010319345,0.00025112854,0.10696716,0.00024281163,0.0001056381,0.0006847481,0.00063411886,0.07342997,0.014172656,0.0054650465,0.7968237,0.00019114146],"about_ca_topic_score_codex":0.02191337,"about_ca_topic_score_gemma":0.040934753,"teacher_disagreement_score":0.02191337,"about_ca_system_score_codex":0.00083490653,"about_ca_system_score_gemma":0.000949261,"threshold_uncertainty_score":0.04357165},"labels":[],"label_agreement":null},{"id":"W2620034093","doi":"10.1109/tsg.2017.2708684","title":"A Controlled Load Estimator-Based Energy Management System for Water Pumping Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Saudi Aramco","keywords":"Estimator; Energy management system; Energy management; Model predictive control; Time horizon; Electric power system; Computer science; Control theory (sociology); Mathematical optimization; Artificial neural network; Power (physics); Energy consumption; Engineering; Energy (signal processing); Control engineering; Control (management)","score_opus":0.013333790380490259,"score_gpt":0.213300220284977,"score_spread":0.19996642990448674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620034093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054642238,0.00018139812,0.93681353,0.00014363368,0.00007153981,0.00016894608,0.00013038568,0.0037075812,0.004140692],"genre_scores_gemma":[0.93903816,0.00007587161,0.05893723,0.00005134709,0.000028736958,0.00013399897,0.0001285664,0.00005521678,0.0015507927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997571,0.0000490661,0.000014536981,0.000063085885,0.00010303089,0.000013232247],"domain_scores_gemma":[0.9997168,0.00009963872,0.00005951856,0.000033005344,0.000078738674,0.000012247772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035924005,0.00044064512,0.00042706603,0.00026949868,0.00032355275,0.00061242323,0.00080715044,0.00032727746,0.0019814048],"category_scores_gemma":[0.0009594927,0.0002747235,0.00021748905,0.00018409606,0.00020765349,0.0007852172,0.00036221696,0.00053713814,0.00036500164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036874076,0.00039037317,0.0038632446,0.00022378251,0.00010351601,0.00021991719,0.000102221944,0.66524523,0.052997544,0.0042389827,0.0028644283,0.26938203],"study_design_scores_gemma":[0.000014463899,0.00006459012,0.0004090746,0.0000042811225,0.000008363657,0.000015012074,0.000002756921,0.99429566,0.0039632507,0.00025813928,0.0009572562,0.000007192109],"about_ca_topic_score_codex":0.003168886,"about_ca_topic_score_gemma":0.0052958806,"teacher_disagreement_score":0.003168886,"about_ca_system_score_codex":0.00040533167,"about_ca_system_score_gemma":0.0006034919,"threshold_uncertainty_score":0.0066284537},"labels":[],"label_agreement":null},{"id":"W2620116181","doi":"10.2495/sdp-v12-n6-1043-1049","title":"Fulfilling the potential of nuclear power industry through demand side management","year":2017,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demand side; Nuclear power; Business; Natural resource economics; Nuclear industry; Environmental economics; Engineering; Economics; Nuclear engineering","score_opus":0.009778788942042111,"score_gpt":0.22756597106635518,"score_spread":0.21778718212431306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620116181","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45303,0.0017035217,0.2220072,0.006278083,0.00020573287,0.00018357197,0.00023734762,0.00038590975,0.3159686],"genre_scores_gemma":[0.98519933,0.00038266715,0.00657576,0.00011572956,0.00004233112,0.000024629086,0.000035824138,0.000019515306,0.007604166],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999668,0.00013012573,0.000007419522,0.000029251178,0.00009536131,0.00006986717],"domain_scores_gemma":[0.99947137,0.00022876485,0.000078366385,0.000050705927,0.00009820596,0.00007263656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054851687,0.00034754092,0.00018938576,0.00032875943,0.00050474954,0.0016444848,0.00051839586,0.0006604355,0.0066135004],"category_scores_gemma":[0.00085911265,0.00012199904,0.00030183056,0.00044499605,0.0005602142,0.0016350492,0.0012574327,0.0005197493,0.0007692999],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057797437,0.000759787,0.01854728,0.0007406632,0.00007044141,0.0016397531,0.0014979781,0.11975495,0.04689337,0.45704633,0.011047554,0.34142393],"study_design_scores_gemma":[0.00009692034,0.0010972432,0.0111329155,0.00029403347,0.00010941074,0.0016557436,0.0055269306,0.43947807,0.034327403,0.37693936,0.12921916,0.00012273912],"about_ca_topic_score_codex":0.0005032924,"about_ca_topic_score_gemma":0.0010568484,"teacher_disagreement_score":0.0066135004,"about_ca_system_score_codex":0.00065886416,"about_ca_system_score_gemma":0.0010689019,"threshold_uncertainty_score":0.02212435},"labels":[],"label_agreement":null},{"id":"W2625447160","doi":"10.1109/iciafs.2016.7946569","title":"Robust Non-Intrusive Load Monitoring (NILM) with unknown loads","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Subspace topology; Computer science; Energy (signal processing); Set (abstract data type); Maximum a posteriori estimation; A priori and a posteriori; Power (physics); Pattern recognition (psychology); Robustness (evolution); Artificial intelligence; Data mining; Mathematics; Statistics; Maximum likelihood","score_opus":0.010137922106292874,"score_gpt":0.172606104515082,"score_spread":0.1624681824087891,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625447160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08421446,0.00048769286,0.91093874,0.000112274654,0.000056784458,0.0000818286,0.00026928846,0.002113,0.0017258319],"genre_scores_gemma":[0.7839788,0.00022848188,0.21210326,0.00011395971,0.0000679583,0.000120584424,0.00078944466,0.0001311313,0.0024663515],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994797,0.00010878163,0.000029170682,0.00018405379,0.0001497546,0.000048481845],"domain_scores_gemma":[0.99956185,0.00014445875,0.000102676706,0.000098151926,0.00007596537,0.000016818001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004777564,0.0010223954,0.00073977734,0.00058505737,0.00022908434,0.00048187084,0.00097541366,0.0004295785,0.00052997883],"category_scores_gemma":[0.0017403425,0.0002551195,0.0004403126,0.0006564426,0.00025159496,0.0006736289,0.00077559095,0.0006802525,0.00037897247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051006477,0.0002126027,0.010439966,0.0003594313,0.00018313348,0.0004217651,0.0003562015,0.19639942,0.051895697,0.0030010568,0.0046504773,0.73157024],"study_design_scores_gemma":[0.000014532568,0.00009038605,0.005092912,0.000015900709,0.000020827823,0.00016473126,0.00005692808,0.9772654,0.013112697,0.0019480805,0.00219515,0.000022394017],"about_ca_topic_score_codex":0.0010951135,"about_ca_topic_score_gemma":0.0022193084,"teacher_disagreement_score":0.0010951135,"about_ca_system_score_codex":0.00022053423,"about_ca_system_score_gemma":0.00029495935,"threshold_uncertainty_score":0.0025267005},"labels":[],"label_agreement":null},{"id":"W2625740731","doi":"10.1109/icps.2017.7945113","title":"The bus-split method for residential load aggregation","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science; Power (physics); Algorithm; Physics","score_opus":0.015294856236956322,"score_gpt":0.27464758540556145,"score_spread":0.25935272916860513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625740731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021852557,0.00013888866,0.9718146,0.00007346855,0.000047801066,0.00006741108,0.00016418766,0.0009994496,0.0048416653],"genre_scores_gemma":[0.48072845,0.00020969722,0.51052696,0.0000824824,0.00007174237,0.00021455389,0.00075065094,0.00042614134,0.006989344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999376,0.00021008505,0.000024268233,0.00008848205,0.0002495897,0.00005160133],"domain_scores_gemma":[0.99940777,0.00017249516,0.000045574696,0.00013787734,0.00020739611,0.000028761478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080889446,0.0007231082,0.0006132904,0.0005890945,0.00040155108,0.0007217602,0.00087240874,0.00034911942,0.0054749968],"category_scores_gemma":[0.0020733115,0.00029466482,0.0004458504,0.0010567014,0.00031577933,0.0013784217,0.00075810234,0.000757582,0.0013322777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004029151,0.00013076022,0.0021502704,0.00014330992,0.00012876981,0.0001393088,0.0003469078,0.6093119,0.008242864,0.042945873,0.007829544,0.32822758],"study_design_scores_gemma":[0.000014122567,0.00002576832,0.00022635557,0.0000043561286,0.000008147568,0.000021378075,0.000028979784,0.9895773,0.0014640505,0.0059808986,0.0026424709,0.00000611746],"about_ca_topic_score_codex":0.0055375462,"about_ca_topic_score_gemma":0.007431249,"teacher_disagreement_score":0.0055375462,"about_ca_system_score_codex":0.00054918334,"about_ca_system_score_gemma":0.0008327049,"threshold_uncertainty_score":0.018315673},"labels":[],"label_agreement":null},{"id":"W2641144656","doi":"10.1109/ccece.2017.7946771","title":"Analytics of residential electrical energy profile","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College","funders":"","keywords":"Computer science; Analytics; Data science; Energy (signal processing); Physics","score_opus":0.010154735911591436,"score_gpt":0.21521633132330747,"score_spread":0.20506159541171604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2641144656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5857027,0.00083520304,0.026658485,0.0010001435,0.00011051307,0.00013477296,0.36187437,0.0063361605,0.017347615],"genre_scores_gemma":[0.7691846,0.00047963735,0.010850426,0.00008556259,0.000041438154,0.00007246957,0.21728319,0.00010270557,0.0018999879],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997373,0.000040036815,0.000023586495,0.000065180946,0.000095003736,0.000038854752],"domain_scores_gemma":[0.99945277,0.00008247092,0.000061861545,0.00011991921,0.0002483959,0.000034639317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020499673,0.0005301173,0.00035766774,0.001604028,0.00015719955,0.00048713383,0.00030239165,0.0003025087,0.0013087366],"category_scores_gemma":[0.0012740763,0.000113796596,0.00023935434,0.0028983997,0.000079218305,0.00070304726,0.00045034883,0.0003441451,0.0011970133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007993453,0.0005321014,0.37483957,0.0008277616,0.00025974083,0.0008945689,0.0006897984,0.10053892,0.0146016395,0.007080379,0.21141732,0.28751895],"study_design_scores_gemma":[0.000034814548,0.00016196298,0.44967484,0.00014584365,0.000066855304,0.0007171539,0.0013652426,0.4110098,0.017010603,0.008724062,0.11100166,0.000087116874],"about_ca_topic_score_codex":0.008992331,"about_ca_topic_score_gemma":0.014067542,"teacher_disagreement_score":0.008992331,"about_ca_system_score_codex":0.00037646072,"about_ca_system_score_gemma":0.00022008302,"threshold_uncertainty_score":0.017880023},"labels":[],"label_agreement":null},{"id":"W2708946506","doi":"10.1109/ccece.2017.7946739","title":"Impact of demand response management on improving social welfare of remote communities through integrating renewable energy resources","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Resources Canada","keywords":"Demand response; Renewable energy; Environmental economics; Renewable resource; Load management; Social Welfare; Computer science; Demand management; Diesel generator; Energy management; Welfare; Business; Energy (signal processing); Economics; Diesel fuel; Engineering; Electricity; Automotive engineering","score_opus":0.016608525565536523,"score_gpt":0.2529737881791002,"score_spread":0.2363652626135637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2708946506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9139303,0.000342189,0.067256704,0.0009766086,0.00003266615,0.00018842585,0.00010359366,0.00013026186,0.017039139],"genre_scores_gemma":[0.99530643,0.00007028057,0.0037717302,0.000031020794,0.000005943922,0.000020412592,0.000016758097,0.00001005727,0.0007672841],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994493,0.00033825924,0.00000669434,0.000041548963,0.00006861943,0.000095554635],"domain_scores_gemma":[0.9991048,0.00051544176,0.00010878615,0.00004072857,0.00009704454,0.00013324259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010774632,0.0007950141,0.00043855555,0.00031174024,0.00045776038,0.0007451185,0.0005501783,0.00062944775,0.0030182034],"category_scores_gemma":[0.0016601542,0.00015416216,0.00038791573,0.00022923313,0.0004201845,0.000960497,0.0011326832,0.00062454346,0.00015500379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046335696,0.00078252354,0.007051954,0.0001299265,0.00012675855,0.00042318055,0.00010795699,0.9250377,0.0100441035,0.00747959,0.00071856286,0.047634397],"study_design_scores_gemma":[0.00006596901,0.0008301443,0.0052366937,0.000017859948,0.000078485806,0.00009539656,0.000598275,0.9808586,0.0039317664,0.0071771196,0.0010881379,0.000021552643],"about_ca_topic_score_codex":0.003932894,"about_ca_topic_score_gemma":0.006717868,"teacher_disagreement_score":0.003932894,"about_ca_system_score_codex":0.000872923,"about_ca_system_score_gemma":0.0009147779,"threshold_uncertainty_score":0.010096908},"labels":[],"label_agreement":null},{"id":"W2724401442","doi":"10.1007/978-3-319-61566-0_18","title":"Managing Energy in Smart Homes Using Binary Particle Swarm Optimization","year":2017,"lang":"en","type":"book-chapter","venue":"Advances in intelligent systems and computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Microgrid; Particle swarm optimization; Renewable energy; Computer science; Energy management; Demand response; Smart grid; Environmental economics; Mathematical optimization; Electricity; Energy (signal processing); Engineering; Electrical engineering; Mathematics; Economics; Algorithm","score_opus":0.017562083237852886,"score_gpt":0.2377408826353603,"score_spread":0.22017879939750742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2724401442","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02059803,0.0016990647,0.9512662,0.00039643157,0.0003267809,0.000041697076,0.000049478364,0.0002949324,0.025327483],"genre_scores_gemma":[0.73468536,0.0025199712,0.23221734,0.00020089785,0.00023978145,0.00015954238,0.0001724974,0.00015783367,0.029646723],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998951,0.000028932847,0.000004275302,0.000013797791,0.000047123172,0.000010818347],"domain_scores_gemma":[0.9999223,0.00004445179,0.0000063931534,0.0000064214573,0.000014943469,0.0000054674306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022794308,0.0005314519,0.0008040196,0.00018716426,0.00035533175,0.00089179527,0.0005469168,0.00066989136,0.0021453083],"category_scores_gemma":[0.0005026131,0.00029164742,0.00034519774,0.00051481405,0.0003787453,0.00067413365,0.00057842245,0.00073008926,0.0003724706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034930265,0.000027323162,0.00019662172,0.000047321617,0.000019371106,0.000026749238,0.000026363074,0.9426497,0.0009128356,0.01140139,0.002488241,0.042169005],"study_design_scores_gemma":[0.000004209024,0.0000069820467,0.00004565745,0.000002801714,0.0000021193573,0.000004638992,0.0000052948194,0.99550605,0.00016300289,0.0035417187,0.00071579247,0.0000017004861],"about_ca_topic_score_codex":0.002754481,"about_ca_topic_score_gemma":0.002651131,"teacher_disagreement_score":0.002754481,"about_ca_system_score_codex":0.00037493752,"about_ca_system_score_gemma":0.00028554598,"threshold_uncertainty_score":0.0071768165},"labels":[],"label_agreement":null},{"id":"W2727305574","doi":"10.1049/iet-gtd.2016.1852","title":"Design and implementation of low‐cost universal smart energy meter with demand side load management","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; Saint Mary's University","funders":"","keywords":"Demand side; Smart meter; Metre; Load shifting; Computer science; Load management; Energy management; Low energy; Reliability engineering; Smart grid; Energy (signal processing); Electrical engineering; Engineering; Environmental economics; Electricity; Mathematics; Economics","score_opus":0.011699920768761309,"score_gpt":0.223363870525896,"score_spread":0.2116639497571347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2727305574","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10062449,0.00043758203,0.87257236,0.00054051075,0.00029521636,0.0005155377,0.0002340368,0.006676858,0.018103419],"genre_scores_gemma":[0.822795,0.00016207702,0.1678167,0.00023456596,0.000052258936,0.00023214733,0.0002144806,0.00007603442,0.008416725],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99952817,0.00007549799,0.000041066458,0.00010061595,0.00019103462,0.000063565494],"domain_scores_gemma":[0.99970466,0.000024606428,0.00004508316,0.00006748926,0.00012698433,0.000031089305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003175433,0.00039944187,0.0004900182,0.00039727462,0.0002941346,0.0006754156,0.0016196435,0.00057238806,0.002533319],"category_scores_gemma":[0.00029795276,0.00028073025,0.00026810862,0.00030360057,0.00025509566,0.0010194596,0.0005193303,0.00038168795,0.0009032218],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071154104,0.00044349444,0.012601951,0.0009025036,0.0001607139,0.00069085316,0.000439482,0.025410386,0.3794325,0.02844237,0.017248215,0.53351593],"study_design_scores_gemma":[0.0003197541,0.0021256828,0.0073118103,0.000052793275,0.00021425632,0.0017228018,0.00019351018,0.3799952,0.44971648,0.0028336628,0.1553739,0.00014011249],"about_ca_topic_score_codex":0.00043543626,"about_ca_topic_score_gemma":0.0004847682,"teacher_disagreement_score":0.002533319,"about_ca_system_score_codex":0.0005133508,"about_ca_system_score_gemma":0.0005398927,"threshold_uncertainty_score":0.008474767},"labels":[],"label_agreement":null},{"id":"W2730557540","doi":"10.1007/978-3-319-61542-4_18","title":"User Satisfaction Based Home Energy Management System for Smart Cities","year":2017,"lang":"en","type":"book-chapter","venue":"Advances in intelligent systems and computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Harmony search; User satisfaction; Smart grid; Harmony (color); Computer science; Genetic algorithm; Differential evolution; Grid; Energy management; Environmental economics; Energy (signal processing); Human–computer interaction; Engineering; Algorithm; Artificial intelligence; Machine learning; Mathematics; Electrical engineering; Economics","score_opus":0.012122626659690012,"score_gpt":0.21878568212564103,"score_spread":0.206663055465951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2730557540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62420136,0.0019143531,0.28763345,0.001261202,0.000466726,0.00047060038,0.0035975566,0.013357828,0.06709691],"genre_scores_gemma":[0.9656254,0.0003298483,0.016132224,0.0002654445,0.00008083157,0.00012186128,0.0015630579,0.000106359876,0.015775008],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998567,0.00003130129,0.000008244805,0.000024470964,0.000057189318,0.000022076052],"domain_scores_gemma":[0.99987245,0.000026822596,0.000011481397,0.000009387194,0.000064507556,0.000015391084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020949262,0.00028281115,0.00046187945,0.00026386298,0.0002473517,0.0005112713,0.00046585742,0.0002453103,0.008275663],"category_scores_gemma":[0.00026705573,0.0000724715,0.0002639498,0.00041451605,0.00006249909,0.00035079877,0.00027922983,0.00025728642,0.001191343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026702438,0.0016773895,0.028109409,0.0004535232,0.00020622682,0.00047465813,0.00048606796,0.01805308,0.055506486,0.0031528745,0.081946574,0.8072634],"study_design_scores_gemma":[0.0002832498,0.0021683073,0.1338879,0.00007639752,0.00037024886,0.0008900739,0.001526941,0.73530513,0.06272171,0.0043706745,0.05822369,0.00017573181],"about_ca_topic_score_codex":0.0016838176,"about_ca_topic_score_gemma":0.0021175374,"teacher_disagreement_score":0.008275663,"about_ca_system_score_codex":0.00025596566,"about_ca_system_score_gemma":0.00014219031,"threshold_uncertainty_score":0.027684808},"labels":[],"label_agreement":null},{"id":"W2734352835","doi":"10.1007/s10479-020-03580-1","title":"Balancing supply and demand in the presence of renewable generation via demand response for electric water heaters","year":2020,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Renewable energy; Electric power; Grid; Population; Peak demand; Power demand; Environmental science; Power (physics); Engineering; Automotive engineering; Electricity; Electrical engineering; Mathematics; Power consumption","score_opus":0.09946719576344583,"score_gpt":0.3411121605336217,"score_spread":0.24164496477017589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734352835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46275407,0.00021282233,0.5295643,0.0010307499,0.00005462384,0.00009388339,0.00020106576,0.00026042224,0.005828041],"genre_scores_gemma":[0.99408937,0.000039613547,0.004607016,0.000029061102,0.0000092708215,0.0000251015,0.000030750718,0.00001439212,0.001155368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999627,0.00018297668,0.000009811896,0.000060161583,0.000046783072,0.0000732011],"domain_scores_gemma":[0.99924135,0.00048840453,0.00012571695,0.000021421884,0.00007199406,0.000051279545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089151616,0.0005088838,0.00077486475,0.0002128277,0.000289106,0.00085214793,0.00067438616,0.0007831156,0.0014286675],"category_scores_gemma":[0.0019798854,0.00063394115,0.0005311283,0.000293742,0.0004900318,0.00085440505,0.0006332425,0.00076405203,0.00015003426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039511775,0.000011504177,0.00024883394,0.0000060601647,0.0000070047317,0.000019219386,0.0000061675682,0.99725384,0.00041199295,0.0012235608,0.000061386825,0.00071087736],"study_design_scores_gemma":[0.0000030276417,0.000006082965,0.000055451794,3.6694627e-7,0.0000015190075,0.000001168768,0.0000023966725,0.9994461,0.0000738469,0.00039122163,0.000017191587,0.0000016257316],"about_ca_topic_score_codex":0.010862749,"about_ca_topic_score_gemma":0.009445734,"teacher_disagreement_score":0.010862749,"about_ca_system_score_codex":0.0010004386,"about_ca_system_score_gemma":0.0010294503,"threshold_uncertainty_score":0.021598995},"labels":[],"label_agreement":null},{"id":"W2734395059","doi":"","title":"Energy in the Afermath of the 2003 Electricity Blackout - U.S. Speaker","year":2005,"lang":"en","type":"article","venue":"Canada-United States law journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Telecommunications; Energy (signal processing); Computer science; Engineering; Electrical engineering; Physics; Power (physics); Electric power system","score_opus":0.004862522098802128,"score_gpt":0.1685724485338995,"score_spread":0.16370992643509735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734395059","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009234638,0.0061818534,0.00047609975,0.5506265,0.042507075,0.00005647032,0.001188357,0.00017426195,0.3895547],"genre_scores_gemma":[0.09047442,0.0037346298,0.00035687847,0.14115325,0.0062765735,0.00006407806,0.000360185,0.00017510894,0.75740486],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933016,0.000061622086,0.000016935766,0.0000809509,0.00024742994,0.00026289746],"domain_scores_gemma":[0.99928707,0.00017968476,0.000037187347,0.000025291336,0.0003110462,0.00015979755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010121535,0.00044769168,0.00029318436,0.00033001334,0.00938104,0.0060019796,0.0005767365,0.01033197,0.016657727],"category_scores_gemma":[0.0026790155,0.0002646776,0.00028271464,0.00057919754,0.0012032527,0.001526167,0.0010548166,0.011394267,0.0038179876],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025578447,0.000010204099,0.00040715182,0.000011180962,0.0000018239248,0.00024252098,0.00035348942,0.000051153118,0.00016796487,0.016628332,0.97761476,0.004485916],"study_design_scores_gemma":[0.0000074388468,0.000007282663,0.001844176,0.00008008703,0.0000054093894,0.000046594974,0.0013052719,0.00009857611,0.0003355115,0.0023471022,0.9939078,0.000014710864],"about_ca_topic_score_codex":0.34709907,"about_ca_topic_score_gemma":0.7183814,"teacher_disagreement_score":0.65290093,"about_ca_system_score_codex":0.009379258,"about_ca_system_score_gemma":0.010161017,"threshold_uncertainty_score":0.6901574},"labels":[],"label_agreement":null},{"id":"W2735003951","doi":"10.1016/j.enpol.2017.07.019","title":"On the influence of jurisdiction on the profitability of residential photovoltaic-storage systems: A multi-national case study","year":2017,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profitability index; Photovoltaic system; Jurisdiction; Environmental economics; Subsidy; Electricity; Incentive; Business; Cost of electricity by source; Grid; Net metering; Feed-in tariff; Finance; Renewable energy; Energy policy; Economics; Distributed generation; Electricity generation; Microeconomics; Engineering; Power (physics); Electrical engineering; Market economy","score_opus":0.02565516114854798,"score_gpt":0.2765555524886427,"score_spread":0.25090039134009473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2735003951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9882365,0.00015837791,0.00035352018,0.00050250045,0.000004459207,0.000013728514,0.000108092245,0.000004988567,0.01061777],"genre_scores_gemma":[0.9994123,0.000053496307,0.000087922344,0.000019455845,0.0000024940582,0.0000030345984,0.000019630199,0.000001678694,0.00040000625],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978859,0.0011238919,0.00005107454,0.00013534242,0.00020934192,0.00059446134],"domain_scores_gemma":[0.9861731,0.010686054,0.0012255757,0.00023338936,0.001013026,0.000668933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022812495,0.00021339949,0.00053795794,0.0008621357,0.00147984,0.0030424455,0.00091257767,0.0014197938,0.0043372884],"category_scores_gemma":[0.007904741,0.00019888651,0.0005905255,0.0012525498,0.0019243235,0.0015523502,0.0012596905,0.0014335656,0.00020460814],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021019178,0.0025774438,0.5360709,0.0002904206,0.0006211468,0.012470405,0.0031141362,0.3045183,0.0070789023,0.09370559,0.0060808943,0.031369943],"study_design_scores_gemma":[0.00031659578,0.0015486066,0.5339937,0.00017018028,0.001122153,0.0020184715,0.040206872,0.3644293,0.0061561367,0.03795827,0.011808536,0.000271151],"about_ca_topic_score_codex":0.0735469,"about_ca_topic_score_gemma":0.10074973,"teacher_disagreement_score":0.0735469,"about_ca_system_score_codex":0.004507618,"about_ca_system_score_gemma":0.002372299,"threshold_uncertainty_score":0.14623761},"labels":[],"label_agreement":null},{"id":"W2737026469","doi":"10.1109/ptc.2017.7981250","title":"Economic dispatch in microgrids using compromise solution method","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Microgrid; Multi-objective optimization; Set (abstract data type); Compromise; Optimization problem; Time horizon; Pareto principle; Electric power system; Integer (computer science); Power (physics); Mathematics; Artificial intelligence","score_opus":0.023163655057743458,"score_gpt":0.28192491038929635,"score_spread":0.25876125533155286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2737026469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032638688,0.0003598009,0.96138036,0.0001621456,0.000043630826,0.00007362572,0.000034144156,0.00014419491,0.0051634326],"genre_scores_gemma":[0.7638171,0.00036559827,0.23251012,0.000069276175,0.000032776283,0.00021584105,0.000074759606,0.00007577876,0.0028387187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932384,0.00036290105,0.000025647381,0.00007079275,0.00017276003,0.000044074673],"domain_scores_gemma":[0.9989266,0.00079625746,0.00008558027,0.000039268816,0.00010914269,0.000043009448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002275494,0.0010348497,0.0011477842,0.0007585168,0.0004289064,0.0010863785,0.0009473613,0.0010977262,0.0019524801],"category_scores_gemma":[0.0035867486,0.00049758685,0.00084687275,0.0008160033,0.00061481085,0.0010790516,0.0012090995,0.0009322753,0.00022305621],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003638573,0.000013131033,0.000118927754,0.000024788364,0.000026449708,0.000028136054,0.000020057638,0.9856329,0.0004975081,0.0055774087,0.00010499643,0.007919242],"study_design_scores_gemma":[0.00000586019,0.00002140937,0.0000311495,0.0000041884323,0.0000039174934,0.000005530044,0.000005018111,0.99773335,0.00014628377,0.0018161461,0.00022388065,0.0000031574186],"about_ca_topic_score_codex":0.0015643262,"about_ca_topic_score_gemma":0.0010142946,"teacher_disagreement_score":0.002275494,"about_ca_system_score_codex":0.000783338,"about_ca_system_score_gemma":0.0006428687,"threshold_uncertainty_score":0.012034118},"labels":[],"label_agreement":null},{"id":"W2739544693","doi":"10.1016/j.apenergy.2017.07.058","title":"Transactive control of fast-acting demand response based on thermostatic loads in real-time retail electricity markets","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"SLAC National Accelerator Laboratory; Pacific Institute for Climate Solutions; Natural Resources Canada; U.S. Department of Energy","keywords":"Demand response; Transactive memory; Electricity; Smart grid; Grid; Control (management); Automotive engineering; Scheme (mathematics); Air conditioning; Peak demand; Computer science; Engineering; Electrical engineering; Mechanical engineering","score_opus":0.0070101492955236076,"score_gpt":0.19820897990688532,"score_spread":0.19119883061136173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2739544693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42825577,0.0004532621,0.5505227,0.0008439527,0.00036684252,0.00006883389,0.000071785245,0.0005139597,0.018902784],"genre_scores_gemma":[0.997889,0.000024548997,0.001066454,0.000022725557,0.000010371964,0.000005681232,0.0000041491194,0.0000070648266,0.0009699364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995129,0.00016174087,0.000026368118,0.00010617842,0.00009453833,0.00009839604],"domain_scores_gemma":[0.998689,0.0007337532,0.00016133483,0.00006263191,0.00025553998,0.00009783941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011131861,0.00054844026,0.00073024025,0.000246808,0.0004236949,0.0014742286,0.000907903,0.0005649931,0.0026164998],"category_scores_gemma":[0.0024138165,0.00033412725,0.0003228136,0.0002605223,0.0008620917,0.0008424489,0.0008063483,0.0008289673,0.00023038696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013473073,0.00037125582,0.0010573249,0.00016682758,0.00011728622,0.00038219002,0.00033170902,0.89780205,0.025484031,0.025941312,0.0018354753,0.045163296],"study_design_scores_gemma":[0.000010441131,0.000056674864,0.00013876692,0.0000020016844,0.000006284302,0.0000116351,0.000018985964,0.9971654,0.0006933821,0.0017522497,0.00013919649,0.0000050379003],"about_ca_topic_score_codex":0.0030717375,"about_ca_topic_score_gemma":0.0036336435,"teacher_disagreement_score":0.0030717375,"about_ca_system_score_codex":0.0005395979,"about_ca_system_score_gemma":0.00048702754,"threshold_uncertainty_score":0.008753061},"labels":[],"label_agreement":null},{"id":"W2740543750","doi":"10.24963/ijcai.2017/52","title":"Multiple-Profile Prediction-of-Use Games","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Convexity; Computer science; Incentive; Tariff; Electricity; Operations research; Mathematical optimization; Microeconomics; Economics; Engineering; Mathematics","score_opus":0.021329947205590668,"score_gpt":0.20746284894968584,"score_spread":0.18613290174409516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740543750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17145352,0.0004109889,0.79758006,0.0030538125,0.00018967007,0.00058435363,0.0017888496,0.0004139941,0.024524873],"genre_scores_gemma":[0.95853865,0.00019087609,0.03417134,0.00032513085,0.00005862726,0.0003507039,0.00029359345,0.00004079165,0.0060303663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958578,0.0023701065,0.00017673112,0.0007002832,0.0004857328,0.00040929884],"domain_scores_gemma":[0.98823184,0.008602581,0.0013237331,0.0007192134,0.0005618975,0.000560629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003921475,0.0019115175,0.002158804,0.0005802001,0.00070343795,0.0019762546,0.0032320344,0.002534088,0.0053072944],"category_scores_gemma":[0.019057387,0.00060436135,0.0010138312,0.0008245363,0.0012137948,0.0036865303,0.0020482116,0.003234487,0.0005238596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007558901,0.0003739979,0.006816701,0.00021445476,0.00019702292,0.0009287637,0.0006563505,0.57515323,0.0020668148,0.36856046,0.007115606,0.03716071],"study_design_scores_gemma":[0.00008053971,0.00007567341,0.0005337701,0.000015287826,0.000020517471,0.00009917727,0.00007363435,0.89121723,0.00034428967,0.10625726,0.0012472599,0.000035370398],"about_ca_topic_score_codex":0.004444871,"about_ca_topic_score_gemma":0.005886159,"teacher_disagreement_score":0.0053072944,"about_ca_system_score_codex":0.0016768507,"about_ca_system_score_gemma":0.0011872002,"threshold_uncertainty_score":0.020739019},"labels":[],"label_agreement":null},{"id":"W2742356686","doi":"10.1109/isie.2017.8001468","title":"Evaluation of meta-heuristic optimization methods for home energy management applications","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Particle swarm optimization; Heuristics; Mathematical optimization; Optimization problem; Heuristic; Meta heuristic; Multi-swarm optimization; Reduction (mathematics); Variable (mathematics); Computation; Metaheuristic; Algorithm; Artificial intelligence; Mathematics","score_opus":0.08083907663058784,"score_gpt":0.3616350605034523,"score_spread":0.2807959838728644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742356686","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44278878,0.009859186,0.5034476,0.0009895087,0.0003870666,0.0007326805,0.0005554698,0.0008921387,0.040347595],"genre_scores_gemma":[0.85684425,0.0016770586,0.1391952,0.000084009174,0.000035022673,0.00034056537,0.00020217008,0.0000665789,0.0015551046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992034,0.0004409995,0.00003524278,0.000045112847,0.00020657269,0.00006870659],"domain_scores_gemma":[0.99822885,0.0011463158,0.00014200089,0.0000828336,0.00035112223,0.000048914953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018343681,0.0011092653,0.00086918555,0.0012578677,0.00039276728,0.0010556389,0.000819155,0.0011089293,0.0014661324],"category_scores_gemma":[0.003328549,0.00030346715,0.00082942523,0.0009299921,0.00028636248,0.0004974014,0.00040192142,0.00059409504,0.00017699694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012669738,0.00012803666,0.0009122751,0.00021413619,0.000107459935,0.000039393013,0.000024357189,0.96059805,0.0010378431,0.0017189295,0.00040313718,0.034689654],"study_design_scores_gemma":[0.000021399008,0.0001502419,0.00034112998,0.000032447777,0.00003113837,0.00001391451,0.000031806132,0.9972922,0.0010852192,0.00035371995,0.0006411987,0.000005584176],"about_ca_topic_score_codex":0.003756959,"about_ca_topic_score_gemma":0.0030169794,"teacher_disagreement_score":0.003756959,"about_ca_system_score_codex":0.00084523536,"about_ca_system_score_gemma":0.0009155667,"threshold_uncertainty_score":0.009701133},"labels":[],"label_agreement":null},{"id":"W2743369941","doi":"10.1016/j.apenergy.2017.07.099","title":"<mml:math xmlns:mml=\"http://www.w3.org/1998/Math/MathML\" altimg=\"si2.gif\" overflow=\"scroll\"><mml:mrow><mml:msub><mml:mrow><mml:mi mathvariant=\"script\">H</mml:mi></mml:mrow><mml:mrow><mml:mn>2</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math>-optimal transactive control of electric power regulation from fast-acting demand response in the presence of high renewables","year":2017,"lang":"lv","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"SLAC National Accelerator Laboratory; Pacific Northwest National Laboratory; U.S. Department of Energy; Pacific Institute for Climate Solutions; Laboratory Directed Research and Development; Office of Science; Battelle","keywords":"Schedule; Computer science; Algorithm; Controller (irrigation); Operations research; Mathematics; Operating system; Biology","score_opus":0.010541717716146487,"score_gpt":0.20931634567807966,"score_spread":0.19877462796193318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743369941","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014508992,0.00023967674,0.17467299,0.002822717,0.0014501107,0.0004258137,0.1915205,0.28538173,0.34203565],"genre_scores_gemma":[0.022492386,0.00080257107,0.098520726,0.0018676859,0.0005561814,0.000933537,0.2229728,0.23246749,0.41938663],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946505,0.00008156476,0.000060478207,0.00008571906,0.00023784206,0.000069393114],"domain_scores_gemma":[0.99770445,0.00061860576,0.00011887303,0.0005859115,0.000820301,0.00015188746],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00086434174,0.0018336165,0.0010109239,0.0018718988,0.00078079297,0.0044837315,0.00317915,0.001877318,0.68424994],"category_scores_gemma":[0.0052401116,0.0011581696,0.0010439228,0.0026425526,0.00050698686,0.0033826788,0.001825181,0.0022573157,0.57656133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010379359,0.00003717092,0.000175005,0.0002344409,0.000011549371,0.000052837582,0.00006949564,0.0007626531,0.0014682827,0.011007039,0.9445317,0.041545995],"study_design_scores_gemma":[0.00005757975,0.000019379151,0.0005595693,0.00008260529,0.000007848658,0.00010127674,0.00005186328,0.0050563766,0.008661568,0.008596426,0.9767596,0.000045890076],"about_ca_topic_score_codex":0.011043689,"about_ca_topic_score_gemma":0.0097107915,"teacher_disagreement_score":0.68424994,"about_ca_system_score_codex":0.0019103133,"about_ca_system_score_gemma":0.0012582786,"threshold_uncertainty_score":0.45037913},"labels":[],"label_agreement":null},{"id":"W2743490277","doi":"10.1109/cjece.2017.2716780","title":"Optimization and Energy Management in Smart Home Considering Photovoltaic, Wind, and Battery Storage System With Integration of Electric Vehicles","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Renewable energy; Energy management; Energy storage; Computer science; Smart grid; Battery (electricity); Heuristic; Wind power; Electricity; Integer programming; Automotive engineering; Energy management system; Reduction (mathematics); Linear programming; Environmental economics; Mathematical optimization; Energy (signal processing); Engineering; Power (physics); Electrical engineering; Mathematics; Algorithm","score_opus":0.0046944286467087435,"score_gpt":0.1488205462439405,"score_spread":0.14412611759723176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743490277","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7570324,0.000567405,0.2319724,0.00023330336,0.00003252262,0.00012931973,0.00010835013,0.00015874804,0.009765566],"genre_scores_gemma":[0.98080164,0.00019249145,0.017366853,0.000012887935,0.000004139236,0.000051787178,0.000025696556,0.000008402046,0.0015361949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975425,0.00011338944,0.0000072016683,0.000031803116,0.00004641119,0.00004699877],"domain_scores_gemma":[0.99985135,0.000087397726,0.000027332559,0.0000075320963,0.00001833188,0.000008009836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044700684,0.0005109006,0.00067070394,0.0002491351,0.00028629808,0.00076385256,0.00032907896,0.0005330073,0.0008960757],"category_scores_gemma":[0.00037376693,0.0003182355,0.00060680683,0.00038609104,0.00026827073,0.0004620049,0.0003090488,0.00035934144,0.00006593711],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049479153,0.00009160788,0.0005013146,0.000038751023,0.000018400158,0.00006362775,0.000017235492,0.9896299,0.0035986775,0.00085572037,0.00009175914,0.0050435606],"study_design_scores_gemma":[0.000010018822,0.00015437519,0.00030666997,0.0000024976566,0.000013537236,0.000010190036,0.000034708708,0.99742883,0.001431578,0.00046461975,0.0001394685,0.0000034749494],"about_ca_topic_score_codex":0.0055384864,"about_ca_topic_score_gemma":0.0074974624,"teacher_disagreement_score":0.0055384864,"about_ca_system_score_codex":0.00059640926,"about_ca_system_score_gemma":0.00069445634,"threshold_uncertainty_score":0.011012495},"labels":[],"label_agreement":null},{"id":"W2744241643","doi":"10.1109/cjece.2016.2583923","title":"Energy Trading in the Smart Grid: A Distributed Game-Theoretic Approach","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Grid; Electricity; Energy (signal processing); Distributed generation; Game theory; Convergence (economics); Distributed computing; Order (exchange); Mathematical optimization; Microeconomics; Business; Economics; Engineering; Electrical engineering; Mathematics","score_opus":0.006182305367519883,"score_gpt":0.15773778429261467,"score_spread":0.1515554789250948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2744241643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007793251,0.00029234012,0.9810509,0.0009941474,0.00009511281,0.000070600865,0.000026898304,0.000052592048,0.009624168],"genre_scores_gemma":[0.76449794,0.0010825372,0.2224557,0.0005621691,0.00026039183,0.0003272103,0.00005684365,0.00005524086,0.010701972],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862206,0.00078938674,0.000042045293,0.00018339776,0.00025778325,0.000105402185],"domain_scores_gemma":[0.999119,0.0005618982,0.00007098657,0.00006476624,0.00010300785,0.00008034502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017150945,0.000855782,0.0015109925,0.0004654415,0.00069833884,0.0020099748,0.0021315373,0.0020938902,0.0031287412],"category_scores_gemma":[0.0021092482,0.00049277477,0.0010521259,0.00069534313,0.0022226,0.0027158093,0.0015062081,0.0017921892,0.00033912927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046861463,0.00008703702,0.00024398752,0.00007617756,0.000047988953,0.00012896635,0.0001035837,0.6678932,0.00090052775,0.318613,0.0009510349,0.010907647],"study_design_scores_gemma":[0.0000284773,0.000025293764,0.00003566812,0.0000078682615,0.000009085517,0.00003180977,0.00003412332,0.91133106,0.00013902882,0.086861916,0.0014857863,0.000009967723],"about_ca_topic_score_codex":0.0027435161,"about_ca_topic_score_gemma":0.0028920977,"teacher_disagreement_score":0.0031287412,"about_ca_system_score_codex":0.0015467259,"about_ca_system_score_gemma":0.0018063732,"threshold_uncertainty_score":0.011222303},"labels":[],"label_agreement":null},{"id":"W2745523508","doi":"10.1007/978-3-319-61813-5_6","title":"Scheduling Domestic Shiftable Loads in Smart Grids: A Learning Automata-Based Scheme","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Learning automata; Computer science; Subnet; Potential game; Mathematical optimization; Scheduling (production processes); Nash equilibrium; Automaton; Distributed computing; Game theory; Algorithmic game theory; Subgame perfect equilibrium; Theoretical computer science; Repeated game; Mathematics; Mathematical economics","score_opus":0.018709116353220555,"score_gpt":0.2344755132125607,"score_spread":0.21576639685934013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2745523508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10584312,0.00028031622,0.878138,0.00061267224,0.00019486966,0.00012943255,0.00018146657,0.0011597308,0.013460531],"genre_scores_gemma":[0.9589887,0.00009546687,0.03691361,0.00010783966,0.00004144838,0.00007955785,0.000095065676,0.000041214047,0.0036369553],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995796,0.00012401197,0.000029042158,0.00011739571,0.0000602383,0.000089568995],"domain_scores_gemma":[0.9989334,0.00063261355,0.00008797614,0.00010693018,0.00014021178,0.00009895104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006656871,0.0006009323,0.0015010915,0.00034399537,0.00084388175,0.0011701443,0.0018511342,0.001236515,0.006419347],"category_scores_gemma":[0.001574302,0.0003326734,0.00065968,0.0005664272,0.0010953153,0.0011212977,0.0011882609,0.0011110853,0.0005295643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018235492,0.00007565271,0.00023617776,0.000053587868,0.000030183015,0.00004352435,0.00005838684,0.95625156,0.0013049681,0.013041713,0.0013479205,0.027373968],"study_design_scores_gemma":[0.000010358548,0.000017895612,0.000022419383,0.0000019977738,0.000004047763,0.0000037109596,0.0000046075284,0.9960187,0.00014262572,0.0036485086,0.0001227513,0.0000024432018],"about_ca_topic_score_codex":0.006608227,"about_ca_topic_score_gemma":0.008195243,"teacher_disagreement_score":0.006608227,"about_ca_system_score_codex":0.001253886,"about_ca_system_score_gemma":0.0012297613,"threshold_uncertainty_score":0.021474898},"labels":[],"label_agreement":null},{"id":"W2749155099","doi":"10.1109/fuzz-ieee.2017.8015650","title":"A graph-based semi-supervised learning approach towards household energy disaggregation","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Graph; Machine learning; Artificial intelligence; Theoretical computer science","score_opus":0.020681605929176693,"score_gpt":0.19911665889016053,"score_spread":0.17843505296098383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749155099","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013803956,0.00021982614,0.9834086,0.00021424417,0.00003056293,0.00005261477,0.00022540301,0.0012522222,0.0007926086],"genre_scores_gemma":[0.61507183,0.0002379014,0.37717342,0.00038562476,0.0001892761,0.00026204583,0.002178727,0.00027366777,0.0042276327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984106,0.00064616185,0.00007162575,0.000485617,0.00028101433,0.0001049305],"domain_scores_gemma":[0.99678373,0.0016534551,0.0003987518,0.0005176954,0.0005277316,0.00011866303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001455586,0.0010196033,0.0018480979,0.0014269577,0.0006376557,0.000875418,0.0024052626,0.0012657468,0.0013870754],"category_scores_gemma":[0.0037180947,0.0006010085,0.00108571,0.0018248804,0.0008195857,0.0013911772,0.0012552023,0.0017148398,0.000690684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019526978,0.00033148992,0.0026249348,0.00017312553,0.00017521072,0.0001491825,0.00025667678,0.7460268,0.0030034399,0.01005905,0.0077062845,0.22929849],"study_design_scores_gemma":[0.000003102999,0.000007710217,0.000102917955,0.0000022756021,0.00000345889,0.000007859618,0.000005512992,0.99528027,0.00019046996,0.0041380837,0.00025520485,0.0000031016764],"about_ca_topic_score_codex":0.00646844,"about_ca_topic_score_gemma":0.010370795,"teacher_disagreement_score":0.00646844,"about_ca_system_score_codex":0.00093443977,"about_ca_system_score_gemma":0.0011283574,"threshold_uncertainty_score":0.012861609},"labels":[],"label_agreement":null},{"id":"W2749664490","doi":"10.1109/tpwrs.2017.2741920","title":"Optimal Regulation of Virtual Power Plants","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Advanced Research Projects Agency - Energy; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Dispatchable generation; Distributed generation; Computer science; Mathematical optimization; Convergence (economics); Virtual power plant; AC power; Optimization problem; Distributed computing; Control engineering; Linear programming; Engineering; Voltage; Renewable energy; Mathematics","score_opus":0.011368927035735985,"score_gpt":0.21113665447886784,"score_spread":0.19976772744313187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749664490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014060924,0.000099454825,0.9792555,0.00016539195,0.000037859656,0.000018385068,0.000024433708,0.000114831644,0.00622327],"genre_scores_gemma":[0.9484229,0.00013188872,0.04873082,0.00007710504,0.00002657079,0.00007294438,0.000032483047,0.000038922666,0.0024663545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946564,0.0002000572,0.000018178442,0.00012288876,0.00011029826,0.00008289788],"domain_scores_gemma":[0.9992286,0.00040422427,0.00013143945,0.000080392776,0.00011449373,0.00004089429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011456814,0.00058185676,0.00066352496,0.00029983124,0.0003725425,0.0013005722,0.0008907719,0.00068133185,0.0019602943],"category_scores_gemma":[0.002694583,0.00035569267,0.00039483808,0.00028114865,0.0011343041,0.0011510651,0.0010662895,0.0009127376,0.00021868823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024059467,0.000012908231,0.000085778454,0.000020299287,0.000006802523,0.000023790759,0.000028169117,0.9393882,0.0010884311,0.05262248,0.00039634632,0.0063027097],"study_design_scores_gemma":[0.000005083123,0.0000116767915,0.000019323568,0.000002433152,0.0000018001165,0.0000056100444,0.0000062254785,0.9900025,0.00021145018,0.00935946,0.00037201872,0.0000024496082],"about_ca_topic_score_codex":0.0015469452,"about_ca_topic_score_gemma":0.0013122595,"teacher_disagreement_score":0.0019602943,"about_ca_system_score_codex":0.00086173613,"about_ca_system_score_gemma":0.000873309,"threshold_uncertainty_score":0.006557882},"labels":[],"label_agreement":null},{"id":"W2750448831","doi":"10.1016/j.apenergy.2017.08.094","title":"Non-intrusive load monitoring under residential solar power influx","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"National Science Foundation of Sri Lanka","keywords":"Renewable energy; Solar power; Photovoltaic system; Scalability; Cluster analysis; Computer science; Load profile; Real-time computing; Power (physics); Engineering; Electricity; Automotive engineering; Electrical engineering; Artificial intelligence; Database","score_opus":0.00755614726628751,"score_gpt":0.21060137822892389,"score_spread":0.20304523096263638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750448831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889558,0.000087484776,0.0073878523,0.00007172799,0.000026174368,0.000016743019,0.00024855539,0.00040780124,0.002797782],"genre_scores_gemma":[0.9993641,0.000011220864,0.00031438988,0.0000065030185,0.0000073062984,0.0000021599396,0.00004306593,0.0000049177606,0.00024650965],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998467,0.000027745013,0.0000076221045,0.000040414176,0.00005166499,0.000025902615],"domain_scores_gemma":[0.99976295,0.00008618838,0.000051724943,0.000022436332,0.000051244406,0.000025426265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010825056,0.0002697182,0.00038050086,0.0003109797,0.00020356725,0.00031562403,0.0002887212,0.00032556866,0.00095350266],"category_scores_gemma":[0.00042733457,0.000087925735,0.00007520581,0.0002805106,0.00012706484,0.0003966947,0.00028706665,0.00022731238,0.00028207898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004879785,0.0007248924,0.30080608,0.0005040004,0.00018281418,0.006950874,0.0011864296,0.07456174,0.3667152,0.0011936807,0.0066212364,0.23567331],"study_design_scores_gemma":[0.000034808778,0.0004919057,0.3033424,0.000020725061,0.00006367642,0.0011996867,0.0006880531,0.65162677,0.040223967,0.0006984033,0.0015802803,0.000029295805],"about_ca_topic_score_codex":0.0007600308,"about_ca_topic_score_gemma":0.0020497045,"teacher_disagreement_score":0.00095350266,"about_ca_system_score_codex":0.00013116481,"about_ca_system_score_gemma":0.00008589075,"threshold_uncertainty_score":0.0031897426},"labels":[],"label_agreement":null},{"id":"W2750941888","doi":"10.1109/tsg.2017.2743760","title":"Incorporating Appliance Usage Patterns for Non-Intrusive Load Monitoring and Load Forecasting","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":160,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"National Science Foundation","keywords":"Computer science; A priori and a posteriori; Identification (biology); Load management; Data mining; Fuzzy logic; Demand response; Set (abstract data type); AC power; Smart meter; Smart grid; Real-time computing; Engineering; Artificial intelligence; Electricity; Voltage","score_opus":0.02814137677123594,"score_gpt":0.24298111804236294,"score_spread":0.214839741271127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750941888","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14712489,0.00022771962,0.8487558,0.00011025482,0.000052110507,0.00006732284,0.0002765153,0.0010439937,0.0023414018],"genre_scores_gemma":[0.86670345,0.0001358696,0.1317139,0.00004383058,0.00004711043,0.000050684404,0.00030407496,0.000036365735,0.0009646609],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997067,0.00006267134,0.000022321661,0.00008247063,0.00010473098,0.000021049847],"domain_scores_gemma":[0.99958116,0.00015933457,0.000098194265,0.00007102517,0.00007363071,0.000016668453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028941463,0.00052078324,0.000357101,0.0008575774,0.00015465966,0.00038606708,0.0005479969,0.00027400628,0.00045286526],"category_scores_gemma":[0.0013364492,0.00022443179,0.00023595127,0.0007753215,0.000120104865,0.0007885191,0.0003543752,0.00035633144,0.0002919518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024368882,0.0002494656,0.025748638,0.00013838173,0.000084959975,0.0002280522,0.00018879779,0.11672669,0.03301131,0.0017264842,0.0014050339,0.82024854],"study_design_scores_gemma":[0.000006019554,0.000066257075,0.007681434,0.000008890091,0.000016735388,0.00014378947,0.000036364927,0.97944975,0.0098715555,0.0012023636,0.0015020561,0.000014810791],"about_ca_topic_score_codex":0.001201913,"about_ca_topic_score_gemma":0.0026611784,"teacher_disagreement_score":0.001201913,"about_ca_system_score_codex":0.00014827555,"about_ca_system_score_gemma":0.00020829123,"threshold_uncertainty_score":0.0023898482},"labels":[],"label_agreement":null},{"id":"W2751369376","doi":"10.3166/ria.31.427-448","title":"Ajustement diffus et adaptatif de la consommation électrique résidentielle par un systéme multi-agent auto-adaptatif","year":2017,"lang":"fr","type":"article","venue":"Revue d intelligence artificielle","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Medicine","score_opus":0.03960528175842511,"score_gpt":0.284034775776138,"score_spread":0.2444294940177129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751369376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6512884,0.00041265663,0.3373486,0.00056043477,0.00013743911,0.00007411845,0.00007176671,0.001555674,0.008550897],"genre_scores_gemma":[0.98803174,0.00007494802,0.009313131,0.000026051988,0.000018249524,0.000025103745,0.000022560162,0.00003908551,0.0024491441],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995053,0.00015291516,0.00002039631,0.00010457895,0.00014125288,0.000075566924],"domain_scores_gemma":[0.997689,0.0013759973,0.00017880915,0.000186883,0.0004413746,0.00012794387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009451835,0.0006519147,0.0006113488,0.00067639054,0.0006366397,0.0015789211,0.0004953796,0.00076891185,0.0014552909],"category_scores_gemma":[0.0043452317,0.0002610066,0.0004446077,0.00036438263,0.0008492793,0.00088820944,0.00082950544,0.0008225012,0.0002539827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004191038,0.00013022254,0.0040654265,0.000061028608,0.00006434119,0.00026073153,0.00030232308,0.89832026,0.028307524,0.0036320605,0.0005506978,0.06388636],"study_design_scores_gemma":[0.000018072978,0.000059029568,0.0013761963,0.0000031281959,0.000009269856,0.000042930056,0.000043913344,0.9940843,0.0034694148,0.00049044547,0.00039160816,0.000011658225],"about_ca_topic_score_codex":0.016704014,"about_ca_topic_score_gemma":0.012110501,"teacher_disagreement_score":0.016704014,"about_ca_system_score_codex":0.0010095225,"about_ca_system_score_gemma":0.0007267018,"threshold_uncertainty_score":0.033213615},"labels":[],"label_agreement":null},{"id":"W2751838336","doi":"10.1109/tia.2017.2750633","title":"Testing the Performance of Bus-Split Aggregation Method for Residential Loads","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Sensitivity (control systems); Power (physics); Metre; Automotive engineering; Computer science; Energy storage; Electricity meter; Engineering; Electronic engineering","score_opus":0.0357871428345641,"score_gpt":0.2830976751381507,"score_spread":0.2473105323035866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751838336","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.847329,0.00015440818,0.14704476,0.00011763166,0.000075120166,0.000116605544,0.00031118825,0.0020668164,0.0027844408],"genre_scores_gemma":[0.96206284,0.000044591663,0.0369414,0.000013803119,0.000011549767,0.00005412846,0.00023114056,0.000040118317,0.00060038664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898905,0.0003335891,0.000052327625,0.00016432151,0.00039119937,0.00006956284],"domain_scores_gemma":[0.99825984,0.00057831395,0.00012501724,0.0003008234,0.00068689615,0.000049039412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010919606,0.0006084423,0.0004730228,0.0004986317,0.000353071,0.00042446845,0.0007037793,0.0003917698,0.00113713],"category_scores_gemma":[0.003177485,0.00017759994,0.00022030012,0.00065475865,0.0002395635,0.0007253765,0.0003656768,0.00036378115,0.00037455556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026534004,0.0010801164,0.040908556,0.0005095894,0.0003209638,0.0005952297,0.0011210961,0.43127516,0.10508712,0.0033024354,0.0053541176,0.4077922],"study_design_scores_gemma":[0.00003256259,0.00033887406,0.0070829103,0.000006026881,0.000019502286,0.00007727793,0.00012902086,0.96433884,0.026888784,0.0003354719,0.0007314201,0.000019325731],"about_ca_topic_score_codex":0.0053220103,"about_ca_topic_score_gemma":0.0037694904,"teacher_disagreement_score":0.0053220103,"about_ca_system_score_codex":0.00046583742,"about_ca_system_score_gemma":0.00038467272,"threshold_uncertainty_score":0.010582089},"labels":[],"label_agreement":null},{"id":"W2754461651","doi":"10.1109/tpwrs.2018.2804353","title":"Setpoint Tracking With Partially Observed Loads","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Setpoint; Control theory (sociology); News aggregator; Regret; Bernoulli's principle; Sublinear function; Computer science; Tracking (education); Mathematical optimization; Regular polygon; Mathematics; Engineering; Control (management); Artificial intelligence","score_opus":0.02129197608899595,"score_gpt":0.20139526829702517,"score_spread":0.18010329220802923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2754461651","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032927256,0.00027242015,0.9634845,0.00031955715,0.000051784802,0.000065884255,0.0001317839,0.00045488673,0.0022919227],"genre_scores_gemma":[0.9267706,0.0001665262,0.07032297,0.00011964341,0.00004347938,0.000118496966,0.00014067233,0.00006609271,0.0022514348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910635,0.00029781865,0.00003594118,0.00023271867,0.00019417539,0.0001329411],"domain_scores_gemma":[0.99678,0.0021343732,0.0004073425,0.00030212532,0.00024711085,0.00012904592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015584505,0.0016029396,0.0016439963,0.00041300556,0.0005026988,0.001378555,0.0018260891,0.0016062382,0.0025597652],"category_scores_gemma":[0.007237785,0.0005421472,0.00077436905,0.0008120079,0.0010576532,0.0018181223,0.0018707927,0.0019169434,0.00037462704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048927734,0.000017493838,0.0001625279,0.000020167088,0.000014964214,0.00003185991,0.000019032692,0.9908025,0.0003415555,0.0032188154,0.00025796276,0.0050641685],"study_design_scores_gemma":[0.000005855547,0.000015442532,0.0000298788,0.000002477428,0.0000020946804,0.0000052611267,0.000003086398,0.9970113,0.00020354471,0.0026265378,0.00009140898,0.0000030867602],"about_ca_topic_score_codex":0.0065475847,"about_ca_topic_score_gemma":0.0039931294,"teacher_disagreement_score":0.0065475847,"about_ca_system_score_codex":0.001316529,"about_ca_system_score_gemma":0.0009888588,"threshold_uncertainty_score":0.013018906},"labels":[],"label_agreement":null},{"id":"W2757802645","doi":"10.1109/tii.2017.2755465","title":"Demand-Side Management by Regulating Charging and Discharging of the EV, ESS, and Utilizing Renewable Energy","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":330,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Microgrid; Renewable energy; Electricity; Computer science; Energy storage; Energy management; Exploit; Demand response; Peak demand; Electricity generation; Environmental economics; Simulation; Power (physics); Engineering; Energy (signal processing); Electrical engineering; Economics","score_opus":0.022090065624755233,"score_gpt":0.2131819800310331,"score_spread":0.19109191440627787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757802645","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35661986,0.0005096508,0.61878014,0.00064497505,0.00014016646,0.00043333374,0.00030664468,0.001153414,0.02141183],"genre_scores_gemma":[0.99011,0.00004582194,0.008722735,0.000040464874,0.0000100872885,0.000034289667,0.000036910722,0.0000092639375,0.0009905164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994499,0.00015793253,0.000027062883,0.00012782449,0.00013838995,0.000098892175],"domain_scores_gemma":[0.99927324,0.00021007286,0.00014228997,0.000109048924,0.00020937604,0.00005598778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006066504,0.0009062234,0.0006476105,0.0001931977,0.00039140435,0.0009748427,0.0015423166,0.000756008,0.0020842121],"category_scores_gemma":[0.0009352089,0.0002516643,0.00045869686,0.00028125537,0.0003869682,0.0009834601,0.0006252233,0.0006333774,0.00034100865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041677005,0.0004982127,0.0033361975,0.00020252755,0.000060369148,0.00019037136,0.000071380004,0.9206848,0.02227666,0.0039504175,0.0013164713,0.046995796],"study_design_scores_gemma":[0.00002484833,0.00019844635,0.00045905806,0.000003900326,0.00001621221,0.000042180003,0.000022389435,0.9945905,0.003340182,0.0007638096,0.0005294023,0.000009061839],"about_ca_topic_score_codex":0.0037893383,"about_ca_topic_score_gemma":0.005328236,"teacher_disagreement_score":0.0037893383,"about_ca_system_score_codex":0.0007348172,"about_ca_system_score_gemma":0.00084316597,"threshold_uncertainty_score":0.0075345635},"labels":[],"label_agreement":null},{"id":"W2757965058","doi":"10.1109/sege.2017.8052785","title":"Economic analysis of commercial PV microgrids","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Battery (electricity); Tariff; Automotive engineering; Photovoltaic system; Computer science; Operating cost; Occupancy; Grid; Environmental science; Reliability engineering; Power (physics); Control (management); Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.009868899386692193,"score_gpt":0.22810654135633102,"score_spread":0.21823764196963882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757965058","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82002205,0.0020083957,0.06961178,0.0017498162,0.000106195956,0.00014400235,0.0010168144,0.00013768215,0.10520326],"genre_scores_gemma":[0.99568343,0.00026433865,0.0012329845,0.000018684406,0.000010400688,0.000025257468,0.00012320188,0.000017156486,0.0026244058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996549,0.00013621544,0.000010126075,0.000036498517,0.000084602296,0.0000776127],"domain_scores_gemma":[0.99918944,0.00051360624,0.00007729675,0.00004429032,0.00012313233,0.000052242623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000805474,0.00044425542,0.0003434275,0.0005185879,0.00039737046,0.0012566868,0.00064899115,0.00049528026,0.0048333625],"category_scores_gemma":[0.0027079994,0.00030994197,0.0004921601,0.0007872525,0.0006439381,0.0013760437,0.00047660104,0.00056090055,0.00018313594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009567491,0.00004866599,0.0022193277,0.00006176382,0.000033559183,0.00017076763,0.000021763488,0.96141773,0.00071637833,0.028150205,0.00080212776,0.0062620146],"study_design_scores_gemma":[0.000013421126,0.000046700705,0.0025256216,0.000013370051,0.000015454752,0.00005532882,0.00014596734,0.9865161,0.0004615328,0.008600796,0.0015948102,0.0000109195325],"about_ca_topic_score_codex":0.01300176,"about_ca_topic_score_gemma":0.007894259,"teacher_disagreement_score":0.01300176,"about_ca_system_score_codex":0.0023204763,"about_ca_system_score_gemma":0.0009333973,"threshold_uncertainty_score":0.025852203},"labels":[],"label_agreement":null},{"id":"W2759253181","doi":"10.1109/sege.2017.8052813","title":"Database system design for energy economization of smart home energy services","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Lethbridge","funders":"","keywords":"Database; Computer science; Cloud computing; Smart grid; Work (physics); Energy management; Process (computing); Home automation; Energy management system; Facility management; Management system; Efficient energy use; Systems engineering; Energy (signal processing); Engineering; Telecommunications; Operating system","score_opus":0.01561421126280102,"score_gpt":0.19582279112727333,"score_spread":0.1802085798644723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2759253181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019823382,0.0016340719,0.96381074,0.00040510698,0.00021112234,0.0005509851,0.000609057,0.006241131,0.0067143156],"genre_scores_gemma":[0.3463024,0.0020727136,0.6341888,0.00044193756,0.00017132926,0.00084589055,0.0034367996,0.00063925923,0.011900842],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984201,0.00037817637,0.00024775267,0.0002803697,0.00054866355,0.00012482642],"domain_scores_gemma":[0.9987191,0.000250762,0.00007617674,0.00028099446,0.000592441,0.00008050994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019494216,0.00035418675,0.0006125602,0.0008380517,0.00069315644,0.0037245934,0.0019966927,0.0006673689,0.005643862],"category_scores_gemma":[0.0030856335,0.00040068268,0.0005452548,0.0010371859,0.0002530608,0.0023988364,0.00084538356,0.00079109,0.0018702238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001783991,0.00064026547,0.008083828,0.0021065846,0.00046554877,0.001271926,0.001366254,0.04201511,0.14229013,0.12904836,0.041313715,0.6296143],"study_design_scores_gemma":[0.0004216253,0.0007109532,0.0045421165,0.00027025325,0.0004744549,0.0020719043,0.00061750243,0.5018219,0.16977337,0.020579455,0.29858777,0.000128774],"about_ca_topic_score_codex":0.00221208,"about_ca_topic_score_gemma":0.0014980586,"teacher_disagreement_score":0.005643862,"about_ca_system_score_codex":0.0006745202,"about_ca_system_score_gemma":0.0012175733,"threshold_uncertainty_score":0.018880665},"labels":[],"label_agreement":null},{"id":"W2759331319","doi":"10.1109/sege.2017.8052811","title":"An online demand response EMS with anomaly usage detection","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Anomaly detection; Computer science; Outlier; Energy (signal processing); Data mining; Real-time computing; Artificial intelligence; Statistics","score_opus":0.014851360577406717,"score_gpt":0.2230655117861624,"score_spread":0.2082141512087557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2759331319","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09589238,0.00014388788,0.8927322,0.00054173375,0.00020474086,0.00015594503,0.00025720676,0.006335401,0.0037364522],"genre_scores_gemma":[0.844032,0.00005737514,0.15136051,0.00020498857,0.000075847296,0.00008965499,0.00028310416,0.000058762926,0.0038377233],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995059,0.00013156609,0.000028617042,0.00014062315,0.00014345384,0.00004985806],"domain_scores_gemma":[0.9995346,0.00011957591,0.000062689,0.00006837574,0.00018493946,0.000029892066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033657733,0.00059533527,0.0006937965,0.00046723225,0.0002460336,0.0004796153,0.00091278367,0.00084687915,0.0020242012],"category_scores_gemma":[0.00085248344,0.00017352494,0.00023638787,0.0004256303,0.00021033805,0.00077043596,0.00047030635,0.0005094415,0.00082587864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013892001,0.0011929302,0.009850172,0.0002665643,0.00014895537,0.00071446365,0.00013784452,0.19400679,0.096648544,0.005001123,0.012623878,0.6780195],"study_design_scores_gemma":[0.000037770944,0.00016728698,0.0011453537,0.000004431199,0.0000138304,0.00019553429,0.00002720687,0.9821812,0.012984712,0.00068765244,0.0025389588,0.000016087793],"about_ca_topic_score_codex":0.001258149,"about_ca_topic_score_gemma":0.0012409313,"teacher_disagreement_score":0.0020242012,"about_ca_system_score_codex":0.0002745023,"about_ca_system_score_gemma":0.00044786348,"threshold_uncertainty_score":0.006771624},"labels":[],"label_agreement":null},{"id":"W2760172647","doi":"10.1109/sege.2017.8052783","title":"Economic analysis of residential solar microgrids","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Photovoltaic system; Net metering; Battery (electricity); Renewable energy; Consumption (sociology); Electricity; Computer science; Automotive engineering; Environmental economics; Economics; Power (physics); Distributed generation; Engineering; Electrical engineering","score_opus":0.007156466980012376,"score_gpt":0.21610594705545158,"score_spread":0.2089494800754392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760172647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8061747,0.0018207447,0.053870756,0.0019576212,0.000052386433,0.00014371259,0.0020683878,0.0001434616,0.13376825],"genre_scores_gemma":[0.9935402,0.0003155158,0.00082261855,0.000016456497,0.000007054313,0.000020517215,0.00017919521,0.000010313221,0.005088191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997894,0.00007768705,0.0000049479445,0.000018165334,0.000051705054,0.000057995396],"domain_scores_gemma":[0.9996811,0.0001703735,0.00003505989,0.00001471025,0.00007378478,0.000024967463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051046786,0.0003845963,0.0003806478,0.00041471544,0.0004066314,0.0010849558,0.00048654864,0.00040882145,0.003972049],"category_scores_gemma":[0.0013474128,0.00029047419,0.00045201846,0.00063972594,0.00046743697,0.00073431496,0.00039412882,0.00041567424,0.00014288006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044681954,0.000018709348,0.0020399527,0.00004288334,0.000017078846,0.00013173172,0.000023322096,0.97648376,0.00036414948,0.016301896,0.0010079688,0.0035238012],"study_design_scores_gemma":[0.000010005463,0.00002465696,0.0031096505,0.000008705665,0.000014031076,0.00001952525,0.00011944377,0.98947996,0.00020096339,0.0055616954,0.001444507,0.000006951095],"about_ca_topic_score_codex":0.15480883,"about_ca_topic_score_gemma":0.13119636,"teacher_disagreement_score":0.15480883,"about_ca_system_score_codex":0.005209692,"about_ca_system_score_gemma":0.0022147316,"threshold_uncertainty_score":0.3078155},"labels":[],"label_agreement":null},{"id":"W2760195126","doi":"10.1613/jair.1.11478","title":"On Overfitting and Asymptotic Bias in Batch Reinforcement Learning with Partial Observability","year":2019,"lang":"en","type":"preprint","venue":"Journal of Artificial Intelligence Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Samsung; Institut de Valorisation des Données; Waalse Gewest","keywords":"Overfitting; Observability; Reinforcement learning; Observable; Context (archaeology); Representation (politics); Computer science; Partially observable Markov decision process; Mathematics; Artificial intelligence; Mathematical optimization; Machine learning; Applied mathematics; Artificial neural network; Markov chain","score_opus":0.17795176204256294,"score_gpt":0.3636504415212668,"score_spread":0.18569867947870386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760195126","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040219735,0.0012323519,0.9535852,0.0016560089,0.00006628797,0.00007012865,0.00006668165,0.00040123734,0.002702342],"genre_scores_gemma":[0.89404565,0.001089695,0.09997935,0.0012345188,0.0002885227,0.00028954973,0.00020038744,0.00036905185,0.0025031907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9910678,0.004626104,0.00044216958,0.0012747728,0.0019600557,0.0006290739],"domain_scores_gemma":[0.83561075,0.14704531,0.005741118,0.0057010166,0.0046770894,0.0012247117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02382284,0.0018160526,0.0028134729,0.001269107,0.00085403584,0.0024130107,0.0025609976,0.0027917668,0.0021972938],"category_scores_gemma":[0.16478752,0.0010753957,0.0012544899,0.0010373312,0.0059466986,0.005498552,0.0044169854,0.005262859,0.00027995222],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000349365,0.000122015095,0.004518362,0.0002787921,0.00016748159,0.00023441078,0.00024396935,0.8904447,0.0014586322,0.07706246,0.0008180702,0.02430166],"study_design_scores_gemma":[0.00003526324,0.0001103705,0.00059672387,0.00006481957,0.000028117205,0.000060833558,0.000022616177,0.92931813,0.00058385683,0.06891898,0.00023749779,0.000022783604],"about_ca_topic_score_codex":0.0047306316,"about_ca_topic_score_gemma":0.003180675,"teacher_disagreement_score":0.02382284,"about_ca_system_score_codex":0.003802431,"about_ca_system_score_gemma":0.0022761542,"threshold_uncertainty_score":0.12598872},"labels":[],"label_agreement":null},{"id":"W2760450605","doi":"10.1109/sege.2017.8052802","title":"Using the thermal energy storage potential of residential homes for ToU rate savings and demand response","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Thermostat; Demand response; Peak demand; Load shifting; Schedule; Load management; Peaking power plant; Thermal energy storage; Thermal mass; Occupancy; Energy consumption; Thermal comfort; Computer science; Automotive engineering; Engineering; Electricity; Electrical engineering; Thermal; Architectural engineering; Distributed generation; Renewable energy","score_opus":0.014522755092653451,"score_gpt":0.23364329148571322,"score_spread":0.21912053639305978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760450605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7914692,0.0005601643,0.16556586,0.00052227813,0.00004791602,0.00008614558,0.00040003122,0.00045621238,0.040892165],"genre_scores_gemma":[0.9957111,0.00009917202,0.0028253892,0.000007890559,0.000003437252,0.000008266782,0.000027305461,0.0000068694612,0.001310704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999884,0.000033301356,0.0000033149088,0.000019364565,0.0000409793,0.000018991015],"domain_scores_gemma":[0.99984837,0.00006604333,0.000016845059,0.000023132814,0.000036558264,0.000009042368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020754423,0.0003720733,0.00032753244,0.00027051862,0.00026755553,0.0008947972,0.000482538,0.00026913278,0.0034702076],"category_scores_gemma":[0.00049356924,0.00020721383,0.00035043844,0.0004888388,0.0003062352,0.0011689367,0.00042891462,0.00024271972,0.00031753787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004070423,0.00017022669,0.010178562,0.0001707481,0.000071462986,0.00037931034,0.000221281,0.8626975,0.0375364,0.01965234,0.0015901319,0.066925004],"study_design_scores_gemma":[0.000019378022,0.00012387874,0.0027560103,0.000017467277,0.000036277906,0.00012721107,0.0001777855,0.9742662,0.013099784,0.0069112955,0.0024373939,0.000027411228],"about_ca_topic_score_codex":0.004915154,"about_ca_topic_score_gemma":0.0097249895,"teacher_disagreement_score":0.004915154,"about_ca_system_score_codex":0.0006008232,"about_ca_system_score_gemma":0.00044781138,"threshold_uncertainty_score":0.011609018},"labels":[],"label_agreement":null},{"id":"W2765117811","doi":"10.3390/en10101640","title":"Transactive Demand Side Management Programs in Smart Grids with High Penetration of EVs","year":2017,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Institute for Information and Communications Technology Promotion; Ministry of Science, ICT and Future Planning","keywords":"Transactive memory; Computer science; Smart grid; Heuristic; Electricity; Demand response; Electric power system; Dynamic pricing; Electricity pricing; Distributed computing; Electricity market; Power (physics); Business; Engineering","score_opus":0.011144444121799484,"score_gpt":0.19161135166713197,"score_spread":0.18046690754533248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765117811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17145032,0.0003364491,0.8185342,0.000296716,0.000038201815,0.000108487264,0.00003487908,0.00045282982,0.008747941],"genre_scores_gemma":[0.9669253,0.000079429454,0.031490505,0.000039201404,0.000009263825,0.00004219657,0.000018094255,0.000019584231,0.0013765278],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999613,0.00016523415,0.000013408884,0.00005731825,0.0000823576,0.00006873273],"domain_scores_gemma":[0.9995801,0.00022325359,0.00007712289,0.000024577494,0.000059056543,0.000035914287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077497994,0.0005344435,0.0006699941,0.00028754192,0.00036520543,0.0006687581,0.00081515155,0.0005482636,0.0015770061],"category_scores_gemma":[0.00081499276,0.00035031067,0.00040716652,0.0003584416,0.0004920939,0.0008057868,0.0006888158,0.000661426,0.00012956126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012394121,0.00011027881,0.00090877485,0.00007051721,0.000027930646,0.00020230195,0.00008340572,0.9411694,0.0037618203,0.0076558846,0.0006094064,0.04527638],"study_design_scores_gemma":[0.000011082015,0.000037463236,0.000086316155,0.00000193786,0.000004600383,0.000016501212,0.000015472622,0.99789906,0.00049978046,0.0012098737,0.00021491988,0.0000030634171],"about_ca_topic_score_codex":0.004116727,"about_ca_topic_score_gemma":0.00681406,"teacher_disagreement_score":0.004116727,"about_ca_system_score_codex":0.0005431903,"about_ca_system_score_gemma":0.0008097856,"threshold_uncertainty_score":0.008185506},"labels":[],"label_agreement":null},{"id":"W2765353894","doi":"10.1016/j.ifacol.2017.08.1869","title":"Scalability through Decentralization: A Robust Control Approach for the Energy Management of a Building Community","year":2017,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"ETH Zürich Foundation; Eidgenössische Technische Hochschule Zürich; Schweizerischer Nationalfonds zur Förderung der Wissenschaftlichen Forschung; National Science Foundation","keywords":"Scalability; Decentralization; Scheme (mathematics); Computer science; Computation; Control (management); Energy management; Mathematical optimization; Decentralised system; Scale (ratio); Distributed computing; Microgrid; Operator (biology); Energy (signal processing); Operations research; Efficient energy use; Engineering; Mathematics; Economics; Artificial intelligence; Algorithm","score_opus":0.03486405324841404,"score_gpt":0.2538673081464007,"score_spread":0.21900325489798664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765353894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005583423,0.00011683272,0.9912573,0.0002006866,0.000030224399,0.000040237348,0.000016183032,0.00018604407,0.0025690235],"genre_scores_gemma":[0.89094734,0.00024392206,0.10437727,0.00014120087,0.0001221852,0.00020067238,0.000052688098,0.000121318764,0.0037933781],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988543,0.0003875978,0.000046934794,0.00028992302,0.00028481174,0.00013646443],"domain_scores_gemma":[0.99796706,0.00087970245,0.00039142134,0.0002895194,0.00034617676,0.00012609373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026324687,0.0009959054,0.0011136836,0.0007458804,0.000655,0.0012512023,0.002244388,0.00096273015,0.0026129298],"category_scores_gemma":[0.004668456,0.00048852956,0.000927936,0.0005729637,0.0017065573,0.0018339246,0.0027527786,0.0015260254,0.0003456939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007343606,0.000042498934,0.00026819046,0.00006897192,0.00003890152,0.00007065995,0.00009862657,0.94261056,0.002751099,0.03241055,0.0008330098,0.020733563],"study_design_scores_gemma":[0.000009359376,0.000025875357,0.000045263885,0.000003833454,0.0000048142892,0.00000923677,0.000009226935,0.9933524,0.00025659442,0.0058601415,0.00041810743,0.000005019148],"about_ca_topic_score_codex":0.0036800455,"about_ca_topic_score_gemma":0.0029816325,"teacher_disagreement_score":0.0036800455,"about_ca_system_score_codex":0.0011586965,"about_ca_system_score_gemma":0.0012115032,"threshold_uncertainty_score":0.013921976},"labels":[],"label_agreement":null},{"id":"W2765942258","doi":"10.23919/pscc.2018.8442447","title":"Optimal Ensemble Control of Loads in Distribution Grids with Network Constraints","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Optech (Canada)","funders":"","keywords":"Mathematical optimization; Flexibility (engineering); Computer science; Control theory (sociology); Demand response; Markov chain; Power (physics); Dual (grammatical number); Process (computing); Optimization problem; Control (management); Engineering; Mathematics; Electricity; Electrical engineering","score_opus":0.006053968758666626,"score_gpt":0.18989883924017067,"score_spread":0.18384487048150405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765942258","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12567995,0.00031349564,0.8640037,0.00048486522,0.000051122068,0.000057022902,0.00015348173,0.00027081798,0.008985574],"genre_scores_gemma":[0.98082674,0.00013234196,0.016781285,0.000043353404,0.00002214518,0.00006544713,0.00008350421,0.000036156478,0.0020089492],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996309,0.0001284101,0.000011745925,0.0000909114,0.00006310626,0.00007473492],"domain_scores_gemma":[0.99928814,0.00044274045,0.00010627995,0.00002850541,0.000089010064,0.000045354544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008884752,0.0008421964,0.00087583816,0.00027390858,0.00036097597,0.0010415814,0.00052875426,0.0005755364,0.0012947257],"category_scores_gemma":[0.0017282818,0.0004416384,0.00040911738,0.00040407202,0.000818594,0.0007645601,0.0010849553,0.00088747765,0.00011419869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015881878,0.0000063421244,0.00008329528,0.00000579596,0.00000573459,0.00000747163,0.000008241759,0.99549294,0.00018518184,0.0021038486,0.00011157457,0.0019735992],"study_design_scores_gemma":[0.0000023516507,0.0000049608843,0.000028078186,7.363908e-7,0.0000010839666,7.4047813e-7,0.0000020620078,0.99878854,0.00004423887,0.0010808775,0.00004537871,9.3329766e-7],"about_ca_topic_score_codex":0.012140043,"about_ca_topic_score_gemma":0.008091456,"teacher_disagreement_score":0.012140043,"about_ca_system_score_codex":0.0010725055,"about_ca_system_score_gemma":0.0010259921,"threshold_uncertainty_score":0.024138749},"labels":[],"label_agreement":null},{"id":"W2766179527","doi":"10.1109/iccpct.2017.8074204","title":"Energy usage analysis of industries with ETAP case study","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ciena (Canada); Mental Health Research Canada","funders":"","keywords":"Audit; Electric potential energy; Payback period; Energy (signal processing); Electrical equipment; Energy conservation; Efficient energy use; Computer science; Automotive engineering; Engineering; Operations management; Business; Electrical engineering; Accounting; Production (economics); Mathematics; Statistics; Economics","score_opus":0.020719974176493388,"score_gpt":0.23250313253950525,"score_spread":0.21178315836301187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766179527","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98879427,0.00006644948,0.0034529013,0.0001252332,0.000007637118,0.0000715513,0.000935925,0.00008404248,0.0064620473],"genre_scores_gemma":[0.99319804,0.000095268544,0.0035085902,0.0000121195235,0.0000027074234,0.000045963097,0.00065702456,0.000013855273,0.0024664355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995461,0.000118836404,0.000039050687,0.00006899738,0.00014816562,0.00007889132],"domain_scores_gemma":[0.99894875,0.0005458966,0.00007107364,0.00008656515,0.00028933692,0.00005835418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000480531,0.00035392953,0.0003267191,0.0014890522,0.0005012385,0.00083554443,0.00079655723,0.00083264295,0.0031964309],"category_scores_gemma":[0.0011741515,0.0002004478,0.0006393413,0.003057558,0.00024027603,0.0007813497,0.00040371472,0.00038287326,0.00042990193],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012866784,0.0017407561,0.23922619,0.0009299832,0.00023654047,0.01730788,0.0030556754,0.60447717,0.01757026,0.009716939,0.0074551785,0.09699681],"study_design_scores_gemma":[0.000048547463,0.00040980976,0.10633462,0.000069118934,0.00010258835,0.0018983344,0.0078124776,0.85937274,0.011277241,0.0024474652,0.010153245,0.00007375995],"about_ca_topic_score_codex":0.016735418,"about_ca_topic_score_gemma":0.014061134,"teacher_disagreement_score":0.016735418,"about_ca_system_score_codex":0.00084093056,"about_ca_system_score_gemma":0.00031236437,"threshold_uncertainty_score":0.033275962},"labels":[],"label_agreement":null},{"id":"W2766900966","doi":"10.1109/iccpct.2017.8074195","title":"Comparison of smart grid development in five developed countries with focus on smart grid implementations in India","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Grid; Software deployment; Electricity; Computer science; Telecommunications; Implementation; Christian ministry; Computer security; Engineering; Systems engineering; Electrical engineering; Geography; Operating system; Political science; Software engineering","score_opus":0.024992013599370304,"score_gpt":0.2863821122505561,"score_spread":0.2613900986511858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766900966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9307696,0.0028975941,0.00070385216,0.0007231719,0.000050603896,0.00007899247,0.0036958875,0.0001877443,0.060892567],"genre_scores_gemma":[0.9939183,0.0015002965,0.000343215,0.00007244333,0.000008447634,0.000022770319,0.001564693,0.000014832438,0.00255496],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9988482,0.00018681592,0.00016592618,0.00008915868,0.00029234675,0.00041756305],"domain_scores_gemma":[0.9971909,0.0004946162,0.00074098,0.00014972061,0.0010367269,0.00038711622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051972654,0.00028909414,0.00023318676,0.0032858443,0.00046676552,0.0022408704,0.00069883553,0.00020779808,0.0026094127],"category_scores_gemma":[0.0018567478,0.00022396365,0.0006481802,0.008075013,0.00064041134,0.0007133322,0.0013930897,0.00047192772,0.00046031905],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065259513,0.00022715084,0.8740976,0.000853998,0.0003916159,0.0019316147,0.002985376,0.008167688,0.0017831102,0.022136157,0.0070811114,0.07969204],"study_design_scores_gemma":[0.00001960918,0.00014069563,0.9742172,0.000114735434,0.0001391622,0.0006515516,0.0038351372,0.0009347993,0.0011829581,0.00038125954,0.018356489,0.000026351652],"about_ca_topic_score_codex":0.031268086,"about_ca_topic_score_gemma":0.036615543,"teacher_disagreement_score":0.031268086,"about_ca_system_score_codex":0.0025107944,"about_ca_system_score_gemma":0.002495551,"threshold_uncertainty_score":0.062172174},"labels":[],"label_agreement":null},{"id":"W2767137066","doi":"10.1007/978-3-319-67837-5_9","title":"Joint Energy Demand Prediction and Control","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"HVAC; Smart grid; Electricity; Energy (signal processing); Energy management; Energy consumption; Consumption (sociology); Control (management); Demand response; Computer science; Joint (building); Environmental economics; Peak demand; Engineering; Architectural engineering; Air conditioning; Economics; Artificial intelligence; Electrical engineering","score_opus":0.016323723155993532,"score_gpt":0.19925679465062696,"score_spread":0.18293307149463342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767137066","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009926324,0.00076756964,0.97562283,0.00033741255,0.0003086562,0.000031651303,0.00020772057,0.00088322203,0.011914643],"genre_scores_gemma":[0.8965935,0.0008705189,0.077218264,0.0001355438,0.00033143518,0.000111773275,0.00075484026,0.00015487519,0.023829188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995425,0.00007758384,0.000022393851,0.0001291778,0.00016413585,0.00006414994],"domain_scores_gemma":[0.9996195,0.0001531739,0.000033813732,0.0000838642,0.00009020599,0.000019440737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072862854,0.0010640951,0.0013745892,0.0003665796,0.0002678674,0.0015098426,0.00071811874,0.0006645344,0.0033263352],"category_scores_gemma":[0.0014535326,0.00045916715,0.0005760064,0.0007711789,0.00048119656,0.001160492,0.0009751567,0.0009346708,0.0010018661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018804503,0.00008726487,0.0005123449,0.000089128436,0.000074234325,0.000047585698,0.000022426459,0.77116746,0.0023461287,0.016486336,0.006806255,0.20217273],"study_design_scores_gemma":[0.0000041967783,0.000014111383,0.0001550763,0.000003830967,0.0000062985005,0.000008554734,0.0000029358566,0.9921251,0.00069152744,0.005977949,0.0010056508,0.0000048199477],"about_ca_topic_score_codex":0.0047038854,"about_ca_topic_score_gemma":0.0036682088,"teacher_disagreement_score":0.0047038854,"about_ca_system_score_codex":0.0004283146,"about_ca_system_score_gemma":0.0007761957,"threshold_uncertainty_score":0.011127651},"labels":[],"label_agreement":null},{"id":"W2767708782","doi":"10.1109/jiot.2017.2771370","title":"Smart Meter Privacy: Exploiting the Potential of Household Energy Storage Units","year":2017,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart meter; HVAC; Benchmark (surveying); Demand response; Markov decision process; Energy storage; Leverage (statistics); Energy consumption; Distributed computing; Computer network; Smart grid; Markov process; Air conditioning; Electricity; Artificial intelligence; Engineering","score_opus":0.026861271362014827,"score_gpt":0.21356370075493053,"score_spread":0.1867024293929157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767708782","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17510958,0.00076126354,0.8155111,0.0012442489,0.00006312186,0.000073406874,0.00015624538,0.00048527287,0.006595835],"genre_scores_gemma":[0.9760501,0.00020151756,0.022848232,0.00006667238,0.000022832415,0.000020323747,0.00004041486,0.000017282871,0.0007326737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991242,0.0004311787,0.000027658021,0.000117840376,0.00018388728,0.00011522022],"domain_scores_gemma":[0.99746466,0.0015717923,0.00027054385,0.00044393374,0.0001764535,0.00007260045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014752159,0.0005227993,0.0006444413,0.0002944396,0.00041942555,0.0010648445,0.0010760126,0.00080921245,0.0013823675],"category_scores_gemma":[0.0046378267,0.00031368012,0.00044989143,0.00059046695,0.00086462096,0.0025152902,0.0014476969,0.000759731,0.00016132968],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040738992,0.00009469719,0.002414038,0.00008233494,0.00004439536,0.00015334706,0.00007964225,0.8962178,0.004768734,0.026459398,0.001038302,0.06823992],"study_design_scores_gemma":[0.00001375338,0.000047603782,0.00022225828,0.000004860135,0.000008499668,0.00003445933,0.000014811659,0.9881634,0.0019222666,0.009023529,0.0005394789,0.0000051732513],"about_ca_topic_score_codex":0.0020178785,"about_ca_topic_score_gemma":0.0019435615,"teacher_disagreement_score":0.0020178785,"about_ca_system_score_codex":0.0007267299,"about_ca_system_score_gemma":0.00092549995,"threshold_uncertainty_score":0.007801771},"labels":[],"label_agreement":null},{"id":"W2768071282","doi":"10.1109/ias.2017.8101862","title":"Distributed energy storage unit-based active demand response for residential loads","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; Smart grid; Peak demand; Power demand; Computer science; Offset (computer science); Energy storage; Grid; Dynamic demand; Distributed generation; Power consumption; Power (physics); Automotive engineering; Reliability engineering; Electrical engineering; Electricity; Engineering; Renewable energy; Mathematics; Operating system","score_opus":0.014325654492759255,"score_gpt":0.2394937588801967,"score_spread":0.22516810438743745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768071282","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6349678,0.00036559685,0.3313903,0.0003321901,0.0002066015,0.00038864653,0.0007000046,0.015844412,0.015804496],"genre_scores_gemma":[0.9857858,0.000029141378,0.012276311,0.00003780595,0.000007513159,0.000039218983,0.00013264446,0.00004575536,0.0016458286],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971014,0.00008064473,0.000018394101,0.00006353143,0.00010380706,0.000023544277],"domain_scores_gemma":[0.9996389,0.000103902166,0.0000419525,0.00006798453,0.00012447065,0.000022657287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030028893,0.0003404993,0.00038465124,0.00027146994,0.00019886697,0.00036032646,0.0009855358,0.00028106154,0.0026808023],"category_scores_gemma":[0.0005839064,0.00017676233,0.00015481001,0.00023316454,0.00015907017,0.00047402282,0.0002885239,0.00025780773,0.0007754523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033412657,0.0015909502,0.009582546,0.0007411812,0.00015365923,0.0006318163,0.00029758186,0.3138775,0.28508103,0.0027115585,0.009694947,0.37229595],"study_design_scores_gemma":[0.00013412273,0.00079472334,0.0028751271,0.000011529031,0.000035587553,0.00015085319,0.00005653554,0.8970395,0.093738176,0.0005372118,0.0045961645,0.000030485724],"about_ca_topic_score_codex":0.0012393206,"about_ca_topic_score_gemma":0.0021378247,"teacher_disagreement_score":0.0026808023,"about_ca_system_score_codex":0.00034790556,"about_ca_system_score_gemma":0.00022912845,"threshold_uncertainty_score":0.008968174},"labels":[],"label_agreement":null},{"id":"W2768248025","doi":"10.2495/sdp-v13-n2-258-267","title":"Greener households? the effectiveness of smart meters in reducing energy consumption levels in the Dach region","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy consumption; Consumption (sociology); Environmental economics; Energy (signal processing); Business; Environmental science; Natural resource economics; Agricultural economics; Economics; Engineering; Electrical engineering; Physics; Art","score_opus":0.025229433113523093,"score_gpt":0.2440155120704993,"score_spread":0.2187860789569762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768248025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7319081,0.1807971,0.0017349144,0.013902863,0.00024885498,0.000092431175,0.0005350536,0.000037873127,0.07074279],"genre_scores_gemma":[0.96449727,0.031700857,0.0014322059,0.0004632152,0.000050240957,0.00001185945,0.000054162385,0.000004214731,0.0017859704],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986247,0.0007974712,0.000048731585,0.00008362237,0.00029971352,0.00014585003],"domain_scores_gemma":[0.99730325,0.0017877863,0.00035382019,0.00004061351,0.00042211416,0.000092304086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024444433,0.00018113498,0.00025389605,0.0009068604,0.00036413223,0.0018246842,0.00039193008,0.00046002914,0.0018772957],"category_scores_gemma":[0.0043422044,0.00007148156,0.00018496702,0.0016168877,0.00052642566,0.0011849344,0.0005825032,0.00027310284,0.00012378395],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011225829,0.00037816493,0.066945925,0.012248146,0.00035979942,0.0010604189,0.0069768205,0.007648608,0.0044308417,0.027198652,0.0062167146,0.8654133],"study_design_scores_gemma":[0.00023792405,0.0031373452,0.38486335,0.013721492,0.0020791576,0.001841171,0.104118824,0.012826194,0.028945962,0.014994358,0.43300945,0.00022484109],"about_ca_topic_score_codex":0.025215318,"about_ca_topic_score_gemma":0.03834364,"teacher_disagreement_score":0.025215318,"about_ca_system_score_codex":0.0023083845,"about_ca_system_score_gemma":0.0021024742,"threshold_uncertainty_score":0.050137103},"labels":[],"label_agreement":null},{"id":"W2769184283","doi":"10.1556/1848.2017.8.2.7","title":"A sustainable design for an off-grid passive container house","year":2017,"lang":"en","type":"article","venue":"International Review of Applied Sciences and Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Rainwater harvesting; Low-energy house; Passive house; Electricity; Grid; Passive solar building design; Photovoltaic system; Civil engineering; Environmental science; Container (type theory); Architectural engineering; Sustainable design; Zero-energy building; Efficient energy use; Environmental economics; Solar energy; Engineering; Sustainability; Electrical engineering; Mechanical engineering; Geography","score_opus":0.020809334230132127,"score_gpt":0.2600014321730996,"score_spread":0.2391920979429675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2769184283","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050759867,0.39680025,0.25931606,0.006122134,0.0025400212,0.0009428862,0.00051505084,0.00044476718,0.28255907],"genre_scores_gemma":[0.28115723,0.42041755,0.19503303,0.0012689595,0.00038941728,0.0006112988,0.0006452472,0.00012756226,0.10034973],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959236,0.00007543735,0.000021350077,0.000035507208,0.00024755223,0.000027874286],"domain_scores_gemma":[0.99990416,0.000015441075,0.000017938783,0.000007805092,0.000048105205,0.000006510052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004414004,0.00050044415,0.00028858308,0.0007498104,0.00028872507,0.0011037398,0.0009615381,0.001009687,0.003022133],"category_scores_gemma":[0.00030781323,0.00021009332,0.0005063897,0.0009145605,0.00032218362,0.0009005119,0.0006988891,0.00047005824,0.0012091502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005187487,0.00018876887,0.00083318364,0.008697096,0.000050373586,0.00060620083,0.00027420235,0.017160837,0.020851495,0.11730977,0.02045893,0.8135173],"study_design_scores_gemma":[0.000012850185,0.00017309758,0.0011964676,0.001143376,0.000058697013,0.00071908545,0.00024437107,0.003033626,0.00724377,0.0059905876,0.98016685,0.000017242264],"about_ca_topic_score_codex":0.001302442,"about_ca_topic_score_gemma":0.0021837177,"teacher_disagreement_score":0.003022133,"about_ca_system_score_codex":0.00068356976,"about_ca_system_score_gemma":0.0014422869,"threshold_uncertainty_score":0.010110021},"labels":[],"label_agreement":null},{"id":"W2772851490","doi":"10.1109/tii.2017.2781256","title":"Power Peak Shaving With Data Transmission Delays for Thermal Management in Smart Buildings","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Shanghai Aerospace Science and Technology Innovation Foundation; Shanghai Jiao Tong University; Science and Technology Commission of Shanghai Municipality; National Natural Science Foundation of China","keywords":"Thermal management of electronic devices and systems; Peaking power plant; Transmission (telecommunications); Load management; Computer science; Smart power; Power (physics); Automotive engineering; Electrical engineering; Engineering; Reliability engineering; Renewable energy; Mechanical engineering; Distributed generation","score_opus":0.05382569274913196,"score_gpt":0.25912247433359964,"score_spread":0.20529678158446768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772851490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1192764,0.0005892314,0.8777887,0.00009326543,0.00006475654,0.00004666784,0.000018265859,0.00041437766,0.0017083228],"genre_scores_gemma":[0.98817,0.00008393081,0.011187708,0.000013080334,0.000015661442,0.000013539585,0.0000072898065,0.000010504752,0.00049819285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997948,0.000043097352,0.000010755818,0.000051564944,0.000063180494,0.00003671646],"domain_scores_gemma":[0.9996834,0.00013324045,0.00007012839,0.000039800387,0.00004816141,0.000025411395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037713494,0.000445065,0.00038501903,0.00023048055,0.00035747568,0.0003439247,0.00057415565,0.00025047746,0.0006435743],"category_scores_gemma":[0.0009164835,0.00014041463,0.00018832262,0.00025819073,0.00032804933,0.0005357805,0.0004567853,0.00037546206,0.00008931842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063213316,0.00016260974,0.0014905415,0.0002804091,0.00005480293,0.0002704429,0.00026403036,0.71907866,0.09363191,0.014421748,0.0008520912,0.1688606],"study_design_scores_gemma":[0.000020553765,0.00024459918,0.00044709255,0.000009004795,0.000022790118,0.00006263503,0.00005638102,0.9749893,0.020001926,0.0028657,0.0012676733,0.000012420314],"about_ca_topic_score_codex":0.0012888863,"about_ca_topic_score_gemma":0.001601369,"teacher_disagreement_score":0.0012888863,"about_ca_system_score_codex":0.0003838518,"about_ca_system_score_gemma":0.00056054804,"threshold_uncertainty_score":0.0027850866},"labels":[],"label_agreement":null},{"id":"W2773032997","doi":"10.23919/picmet.2017.8125281","title":"Typology of Business Models for Adopting Grid-Scale Emerging Storage Technologies","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Business model; Energy storage; Electricity market; Environmental economics; Electricity; Renewable energy; Grid; Profitability index; Computer science; Distributed generation; Smart grid; Efficient energy use; Risk analysis (engineering); Business; Engineering; Marketing; Economics","score_opus":0.021843501205078424,"score_gpt":0.2297850532805818,"score_spread":0.20794155207550338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773032997","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36523435,0.0020074332,0.23442745,0.0093622105,0.00018586335,0.0015345649,0.0014659604,0.00073165016,0.38505048],"genre_scores_gemma":[0.9301825,0.0010505524,0.05910974,0.0004966807,0.000044969613,0.00074450363,0.0010493663,0.00007677024,0.007244889],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99422413,0.0022242924,0.0004277191,0.0005499587,0.0016304571,0.00094342296],"domain_scores_gemma":[0.99150604,0.00351868,0.0013764206,0.001284896,0.0013809672,0.0009330414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003797602,0.0008141059,0.0004781876,0.0041837674,0.0020762219,0.009653403,0.0015410555,0.0024251346,0.0056164614],"category_scores_gemma":[0.009065231,0.00029978008,0.0015242244,0.004286496,0.0035476391,0.0071564773,0.0028499884,0.0018033294,0.0012232687],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005281275,0.0001745731,0.010916664,0.000081132486,0.000028810786,0.00057810143,0.0015464367,0.0035428326,0.0005937736,0.95965385,0.0025556462,0.020275434],"study_design_scores_gemma":[0.00010315422,0.00015581661,0.01280724,0.0005431687,0.00006684381,0.0025566623,0.014993238,0.068580955,0.0013570278,0.78535503,0.113369174,0.000111776106],"about_ca_topic_score_codex":0.0032472105,"about_ca_topic_score_gemma":0.0021656652,"teacher_disagreement_score":0.009653403,"about_ca_system_score_codex":0.0030440772,"about_ca_system_score_gemma":0.002230665,"threshold_uncertainty_score":0.022086501},"labels":[],"label_agreement":null},{"id":"W2773137334","doi":"10.1109/jas.2017.7510691","title":"Economical optimization of grid power factor using predictive data","year":2017,"lang":"en","type":"article","venue":"IEEE/CAA Journal of Automatica Sinica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Dalhousie University; U.S. Department of Energy","keywords":"Factor (programming language); Computer science; Power grid; Predictive power; Grid; Power (physics); Mathematics; Physics","score_opus":0.05302742896056461,"score_gpt":0.28955430898672974,"score_spread":0.23652688002616512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773137334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02991143,0.00016799422,0.9640541,0.00016679565,0.00004364827,0.000047114623,0.000058118134,0.00037066053,0.0051801414],"genre_scores_gemma":[0.92896634,0.00009360833,0.06911175,0.0000414801,0.00002969157,0.00008041818,0.00005890683,0.00005244871,0.001565285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971706,0.00004037642,0.0000115233015,0.000050134964,0.00015006166,0.000030815023],"domain_scores_gemma":[0.9996737,0.00013613554,0.000053803,0.000044365323,0.00008070657,0.000011349254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044118796,0.00071230176,0.0006149427,0.00049802056,0.0002846007,0.0006691556,0.00064588164,0.00041146058,0.0014463905],"category_scores_gemma":[0.0012730041,0.00027817892,0.00037578898,0.00054618926,0.0003793482,0.0007316407,0.00043281732,0.0006476226,0.00016073145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051565552,0.000048212158,0.00042652083,0.000040883737,0.000017041804,0.00005051651,0.000028803184,0.9271203,0.0032950428,0.004935016,0.00059088547,0.06339521],"study_design_scores_gemma":[0.0000059122212,0.000017636346,0.00007413278,0.0000019182717,0.0000038275552,0.000005331013,0.00000310909,0.99766386,0.0009831601,0.00094629556,0.00029177382,0.0000030207589],"about_ca_topic_score_codex":0.005556814,"about_ca_topic_score_gemma":0.006317486,"teacher_disagreement_score":0.005556814,"about_ca_system_score_codex":0.0006054276,"about_ca_system_score_gemma":0.00071962073,"threshold_uncertainty_score":0.011048973},"labels":[],"label_agreement":null},{"id":"W2773257536","doi":"10.1109/tii.2017.2782725","title":"Joint Load Scheduling and Voltage Regulation in the Distribution System With Renewable Generators","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Alberta","funders":"Innovation-Driven Project of Central South University; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Renewable energy; Voltage regulation; Smart grid; Overvoltage; Computer science; Scheduling (production processes); Demand response; Electric power system; Voltage; Automotive engineering; Reliability engineering; Electricity; Engineering; Electrical engineering; Power (physics)","score_opus":0.030954491375054634,"score_gpt":0.20666066780852207,"score_spread":0.17570617643346745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773257536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38615385,0.00058361265,0.60735625,0.00035365787,0.00006636954,0.00010950838,0.00016241947,0.0004998804,0.004714384],"genre_scores_gemma":[0.9920189,0.00007197205,0.0074610664,0.000013932088,0.0000105815125,0.000015155148,0.000028300366,0.000013181092,0.00036693894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961925,0.00014713599,0.000013998974,0.00007655696,0.0000608726,0.00008216167],"domain_scores_gemma":[0.9993316,0.00034333122,0.00015891652,0.000036333517,0.00008377492,0.000046130925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068696577,0.0006390093,0.00072651764,0.000336926,0.00034872227,0.0007211507,0.0004690831,0.00042988002,0.0007477571],"category_scores_gemma":[0.001628048,0.00032859587,0.0002678217,0.00045909054,0.0003631254,0.0005802548,0.00035844246,0.00046069743,0.00011913122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006177014,0.000026726928,0.0004501916,0.000016049014,0.000010821902,0.000046893394,0.0000110948195,0.98969996,0.0010641686,0.00090706133,0.00022238767,0.0074828286],"study_design_scores_gemma":[0.000011531758,0.00001753057,0.00015773633,7.8869925e-7,0.0000042603388,0.000005088989,0.000005582343,0.99887866,0.00025490645,0.00059057807,0.00007126432,0.000002012169],"about_ca_topic_score_codex":0.009945298,"about_ca_topic_score_gemma":0.008489372,"teacher_disagreement_score":0.009945298,"about_ca_system_score_codex":0.00083638635,"about_ca_system_score_gemma":0.00073676405,"threshold_uncertainty_score":0.019774854},"labels":[],"label_agreement":null},{"id":"W2774787369","doi":"10.3390/s17122812","title":"Energy Management in Smart Cities Based on Internet of Things: Peak Demand Reduction and Energy Savings","year":2017,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":135,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Powertech Labs (Canada); University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Efficient energy use; Carbon footprint; Information and Communications Technology; Energy conservation; Agile software development; Home automation; Energy management; Environmental economics; Computer science; Robustness (evolution); Energy consumption; Engineering; Energy (signal processing); Greenhouse gas; Telecommunications","score_opus":0.007553504877234909,"score_gpt":0.19202938503109016,"score_spread":0.18447588015385524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774787369","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24463178,0.005198844,0.683829,0.0051850937,0.0005017905,0.00022504962,0.00036933608,0.001220785,0.058838308],"genre_scores_gemma":[0.94171923,0.0019774756,0.05042478,0.00026735337,0.00004705868,0.000053788077,0.00019294609,0.000036388446,0.005281029],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998865,0.000025622841,0.0000056304434,0.000018428285,0.00004224178,0.000021635278],"domain_scores_gemma":[0.9999312,0.000020422562,0.000009487279,0.000006826383,0.000026115424,0.0000058357973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022208557,0.00028236446,0.00027165067,0.0003144964,0.0003734076,0.00060455437,0.00042712485,0.0005362301,0.0010204546],"category_scores_gemma":[0.00030169447,0.000120755074,0.0003738692,0.0008953725,0.0002299198,0.0010712603,0.00043363584,0.00040290348,0.0002029736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025440566,0.00035243575,0.009385655,0.00057146966,0.00011249985,0.0006941019,0.0003446355,0.400366,0.03413765,0.06061435,0.014427319,0.47873953],"study_design_scores_gemma":[0.00002375388,0.00013758597,0.0048023346,0.00005569483,0.000045961668,0.0002425048,0.00055313524,0.92933017,0.010703478,0.028582934,0.025475709,0.000046795914],"about_ca_topic_score_codex":0.0040240353,"about_ca_topic_score_gemma":0.0074495957,"teacher_disagreement_score":0.0040240353,"about_ca_system_score_codex":0.000420266,"about_ca_system_score_gemma":0.00057220994,"threshold_uncertainty_score":0.008001208},"labels":[],"label_agreement":null},{"id":"W2775376604","doi":"10.1109/smc.2017.8123019","title":"Market-based mechanisms for smart grid management: Necessity, applications and opportunities","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Microgrid; Computer science; Electricity market; Energy management; Distributed generation; Load management; Grid; Electricity; Risk analysis (engineering); Supply and demand; Environmental economics; Demand response; Business; Renewable energy; Energy (signal processing); Engineering; Electrical engineering; Control (management); Economics; Microeconomics","score_opus":0.028666867868197478,"score_gpt":0.230324954295808,"score_spread":0.20165808642761052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775376604","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021940567,0.2280092,0.56085634,0.08263792,0.0036867682,0.00035095395,0.0001339812,0.0006152864,0.101769045],"genre_scores_gemma":[0.6153094,0.16743949,0.18453598,0.00542964,0.008477343,0.00063146447,0.00014543335,0.00015953639,0.017871702],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985372,0.000626461,0.00007264809,0.00011035061,0.00053658936,0.00011682454],"domain_scores_gemma":[0.9956334,0.0028953655,0.00036982878,0.00036234615,0.00055512105,0.00018394519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005783015,0.0006947188,0.00094670575,0.0014303337,0.0008618519,0.0056751072,0.001751462,0.0032766513,0.0049774945],"category_scores_gemma":[0.0057516806,0.0004967928,0.00078730314,0.0018051855,0.0037956545,0.015784428,0.0017115998,0.002999682,0.0005937956],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014218232,0.00004676682,0.000114089205,0.00022680176,0.000012711455,0.0000616,0.000057341018,0.0026470006,0.00032691174,0.96334887,0.0027233942,0.030420315],"study_design_scores_gemma":[0.000041957665,0.000078354424,0.00018298152,0.0003239553,0.000017719292,0.00022892088,0.00018564516,0.028143827,0.00086154003,0.86325705,0.10663151,0.000046576322],"about_ca_topic_score_codex":0.00046111178,"about_ca_topic_score_gemma":0.00043916568,"teacher_disagreement_score":0.005783015,"about_ca_system_score_codex":0.0018963766,"about_ca_system_score_gemma":0.0017451289,"threshold_uncertainty_score":0.030583918},"labels":[],"label_agreement":null},{"id":"W2775772607","doi":"10.1109/iecon.2017.8216069","title":"Parameter estimation of electric water heater models using extended Kalman filter","year":2017,"lang":"en","type":"article","venue":"IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Kalman filter; Electric heating; Energy consumption; Electric energy consumption; Water heater; Heating system; Electric power; Thermal; Estimation theory; Computer science; Water heating; Process (computing); Energy (signal processing); Power (physics); Electric energy; Engineering; Mechanical engineering; Algorithm; Meteorology","score_opus":0.07550263242113019,"score_gpt":0.26391391261461034,"score_spread":0.18841128019348014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775772607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046479132,0.00017783158,0.95124424,0.000062495994,0.000024431738,0.000034522356,0.00009297581,0.00065111055,0.0012332674],"genre_scores_gemma":[0.95481974,0.00024393476,0.04257706,0.000023990533,0.000010849586,0.00010435382,0.00022983899,0.000037233847,0.0019529683],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972254,0.00007130943,0.000025720381,0.00008231479,0.000066537395,0.000031619507],"domain_scores_gemma":[0.9994869,0.0002608107,0.000087074746,0.000044707653,0.00011192503,0.000008540014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067595334,0.0006762185,0.00063877,0.00033842082,0.0002562631,0.00069772976,0.00050985295,0.00065233983,0.0010156516],"category_scores_gemma":[0.0016219907,0.0004062275,0.00053476775,0.0002965056,0.00029188106,0.0008038262,0.00041882362,0.0007322563,0.00036802012],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008100436,0.00002451137,0.0010541094,0.000066902925,0.000038467253,0.00002557101,0.00004821011,0.9650639,0.0045694984,0.0008258411,0.00019876196,0.028003199],"study_design_scores_gemma":[0.0000049199593,0.000014414275,0.00040833128,0.0000036295742,0.000005719278,0.000003829988,0.0000043035107,0.99771166,0.0014352761,0.00022167053,0.00018053027,0.0000057407806],"about_ca_topic_score_codex":0.0140141975,"about_ca_topic_score_gemma":0.00918144,"teacher_disagreement_score":0.0140141975,"about_ca_system_score_codex":0.00047409104,"about_ca_system_score_gemma":0.0005558308,"threshold_uncertainty_score":0.027865231},"labels":[],"label_agreement":null},{"id":"W2778611676","doi":"10.1109/globalsip.2017.8309133","title":"Incorporating time-of-day usage patterns into non-intrusive load monitoring","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power consumption; Reduction (mathematics); Real-time computing; Consumption (sociology); Class (philosophy); Power (physics); Power demand; Reliability engineering; Artificial intelligence; Engineering","score_opus":0.009118030189375704,"score_gpt":0.22481855715743904,"score_spread":0.21570052696806333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2778611676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09287571,0.00035817348,0.90156317,0.00015031187,0.00010109465,0.0000797967,0.00030438797,0.001894205,0.0026732038],"genre_scores_gemma":[0.75515205,0.00043652247,0.24093309,0.00008358634,0.00011424222,0.00009366218,0.0005439137,0.00017542543,0.0024674544],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996824,0.00009064363,0.00002168502,0.0000762396,0.00010520132,0.000023819652],"domain_scores_gemma":[0.99939466,0.00024509965,0.000109965054,0.00012533301,0.00009754003,0.000027367769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036987814,0.00071522803,0.0005052716,0.00077640364,0.00023542633,0.000529942,0.00066423364,0.0003297284,0.0008786597],"category_scores_gemma":[0.0021290164,0.00026895295,0.00038787027,0.0008405977,0.00017045636,0.0007809247,0.00045274122,0.00050441525,0.00037901982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029840917,0.00035634133,0.050842818,0.00031343923,0.00020900813,0.0002648897,0.00036851107,0.19792937,0.028084688,0.0027537316,0.003047285,0.7155315],"study_design_scores_gemma":[0.0000065089857,0.000060852173,0.009970718,0.000017089336,0.000019282968,0.00013612279,0.000051074247,0.9797503,0.0058706626,0.001571862,0.0025256497,0.00001999097],"about_ca_topic_score_codex":0.002985479,"about_ca_topic_score_gemma":0.007635443,"teacher_disagreement_score":0.002985479,"about_ca_system_score_codex":0.00019237582,"about_ca_system_score_gemma":0.00030661526,"threshold_uncertainty_score":0.0059362054},"labels":[],"label_agreement":null},{"id":"W2779684463","doi":"","title":"Load Scheduling for Residential Demand Response on Smart Grids","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; Computer science; Time horizon; Scheduling (production processes); Mathematical optimization; Schedule; Smart grid; Load management; Electric power system; Linear programming; Grid; Integer programming; Photovoltaic system; Electricity; Energy consumption; Power (physics); Engineering; Electrical engineering","score_opus":0.016447920411626744,"score_gpt":0.23557140248903224,"score_spread":0.2191234820774055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2779684463","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42546108,0.0004771556,0.5444684,0.001732389,0.00040094787,0.0002511574,0.0005572261,0.0015873372,0.025064358],"genre_scores_gemma":[0.9873592,0.00005657708,0.008386223,0.00004452218,0.000051659936,0.000021123049,0.00010402436,0.000086660104,0.003889888],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962246,0.00013891266,0.000014310634,0.00006891414,0.00005234198,0.00010312829],"domain_scores_gemma":[0.9991819,0.00046727987,0.000055482098,0.000052470914,0.00014381946,0.00009898651],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007793991,0.0005024732,0.0010460608,0.00027328698,0.00055460574,0.0010988477,0.00069423666,0.0005541827,0.008561111],"category_scores_gemma":[0.0024017664,0.00029905155,0.0002441783,0.00049513625,0.00035961543,0.0006789338,0.000599401,0.0005925504,0.0005692977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051308883,0.00010113171,0.0004766386,0.00009484846,0.000020131753,0.00006797754,0.00007102413,0.956347,0.0031416283,0.0052090874,0.0043752464,0.029582215],"study_design_scores_gemma":[0.0000084147205,0.00001872729,0.000112031405,0.0000012862654,0.0000024381413,0.000004024952,0.000021617583,0.9975758,0.00027286055,0.0017267137,0.0002544815,0.0000015944602],"about_ca_topic_score_codex":0.0074968943,"about_ca_topic_score_gemma":0.007890555,"teacher_disagreement_score":0.008561111,"about_ca_system_score_codex":0.0011013488,"about_ca_system_score_gemma":0.00075673027,"threshold_uncertainty_score":0.028639734},"labels":[],"label_agreement":null},{"id":"W2781825008","doi":"10.3390/en11010088","title":"Power Estimation of Multiple Two-State Loads Using A Probabilistic Non-Intrusive Approach","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Thermostat; Computer science; Inference; Kronecker delta; Task (project management); Probabilistic logic; Markov chain; Hidden Markov model; State (computer science); Markov model; Event (particle physics); State space; Electrical load; Power (physics); Data mining; Machine learning; Artificial intelligence; Engineering; Algorithm; Mathematics; Statistics","score_opus":0.009132344461649042,"score_gpt":0.21845196136356887,"score_spread":0.20931961690191983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781825008","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034853425,0.00007982019,0.9642067,0.00004878915,0.000010795938,0.000018804136,0.000030520958,0.00018955587,0.0005615463],"genre_scores_gemma":[0.91428083,0.00011741444,0.083774745,0.000047911435,0.000044179353,0.000045732846,0.00012108278,0.00003578026,0.0015322567],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994236,0.00014717595,0.000026826052,0.00020282039,0.00015510448,0.000044534103],"domain_scores_gemma":[0.99930155,0.00038929223,0.00011354658,0.000099120516,0.00006830102,0.000028263465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000555337,0.0007955669,0.00067177194,0.0004494735,0.00024271462,0.00064579665,0.00082083856,0.0004945759,0.000698991],"category_scores_gemma":[0.002086667,0.00054650847,0.00055293617,0.0004494958,0.0003760827,0.0010218925,0.0008849744,0.000717082,0.0002051289],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036685047,0.00016696438,0.0054593612,0.00013644467,0.00016473727,0.00033540872,0.00026720023,0.7513055,0.027486145,0.009515404,0.0005518315,0.20424417],"study_design_scores_gemma":[0.0000027843462,0.000017968117,0.00051809556,0.0000017474532,0.0000058093165,0.00002444025,0.0000048468346,0.9970726,0.0011332481,0.0010987237,0.00011528205,0.0000044461704],"about_ca_topic_score_codex":0.0011976698,"about_ca_topic_score_gemma":0.0018164539,"teacher_disagreement_score":0.0011976698,"about_ca_system_score_codex":0.00022268054,"about_ca_system_score_gemma":0.0002986359,"threshold_uncertainty_score":0.0029369593},"labels":[],"label_agreement":null},{"id":"W2782764707","doi":"10.1109/bigdata.2017.8258254","title":"Efficient incremental data analytics with apache spark","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"SPARK (programming language); Computer science; Speedup; Scalability; Smart meter; Analytics; Big data; Data analysis; Context (archaeology); Computation; Field (mathematics); Efficient energy use; Electricity; Real-time computing; Data science; Data mining; Database; Parallel computing; Algorithm; Engineering","score_opus":0.04724063593868591,"score_gpt":0.2396669557520377,"score_spread":0.1924263198133518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782764707","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05106537,0.0009849932,0.7367884,0.0012829177,0.00072703656,0.0007229376,0.0073394068,0.18965755,0.011431343],"genre_scores_gemma":[0.43295294,0.00053175946,0.53138083,0.00050752575,0.0002662672,0.00066359754,0.024819683,0.004660884,0.0042165318],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99728143,0.0003043612,0.00021607794,0.0006411202,0.0012411441,0.00031571474],"domain_scores_gemma":[0.99706453,0.000718292,0.00013836335,0.0011305597,0.00066770357,0.00028049015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016007136,0.002016337,0.0012327542,0.0013382776,0.00087557326,0.0023495113,0.004192934,0.000510059,0.003469083],"category_scores_gemma":[0.0072954153,0.00082763936,0.0011940683,0.0026021048,0.0007403564,0.0035368337,0.003735427,0.0019905223,0.002769971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023068923,0.0009105508,0.011622423,0.0011450972,0.0005741201,0.0010562252,0.0011406444,0.117150486,0.034881778,0.028300274,0.26807126,0.5328403],"study_design_scores_gemma":[0.00036193884,0.00014267047,0.0019422887,0.000031863787,0.000064384425,0.00031234184,0.00027881382,0.9070098,0.019357998,0.034858298,0.035552252,0.000087395616],"about_ca_topic_score_codex":0.0076788575,"about_ca_topic_score_gemma":0.007804334,"teacher_disagreement_score":0.0076788575,"about_ca_system_score_codex":0.00065879064,"about_ca_system_score_gemma":0.0033229585,"threshold_uncertainty_score":0.015268326},"labels":[],"label_agreement":null},{"id":"W2783668805","doi":"10.1177/1477153517731909","title":"Lighting controls: Evolution and revolution","year":2018,"lang":"en","type":"article","venue":"Lighting Research & Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Smart lighting; Intelligent lighting; Daylight; LED lamp; Architectural engineering; Computer science; Context (archaeology); Function (biology); Wireless; System integration; Control (management); Systems engineering; Telecommunications; Engineering; Electrical engineering; Database; Artificial intelligence; Geography","score_opus":0.01828340284506365,"score_gpt":0.28146000322795384,"score_spread":0.2631766003828902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783668805","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02831288,0.31910124,0.08648206,0.13640921,0.0072321533,0.000117419106,0.0002617069,0.0011361158,0.42094725],"genre_scores_gemma":[0.5751544,0.24201143,0.042089425,0.028361512,0.011782419,0.000255151,0.00031830446,0.0007295765,0.099297866],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99703467,0.0007238167,0.00019734149,0.00068473304,0.0010741542,0.00028535744],"domain_scores_gemma":[0.99746144,0.0009816109,0.0001529908,0.0004322469,0.0007263751,0.00024521365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033058443,0.00094162405,0.00057600363,0.0017930936,0.0015269353,0.0062837387,0.0011936391,0.004053393,0.0057271123],"category_scores_gemma":[0.00425327,0.00042096592,0.00058890536,0.0015132733,0.010205476,0.008246301,0.0031873493,0.005410137,0.001517114],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004857617,0.000044211392,0.0003427077,0.00021776932,0.0000124448525,0.000058210633,0.0010057397,0.0013126665,0.00076960324,0.8695407,0.013887746,0.1127595],"study_design_scores_gemma":[0.00001622651,0.00009101844,0.0007579837,0.000558174,0.0000114787645,0.00024682458,0.0007630429,0.0020915105,0.000799497,0.25841415,0.736209,0.00004116231],"about_ca_topic_score_codex":0.0047550104,"about_ca_topic_score_gemma":0.001959178,"teacher_disagreement_score":0.0062837387,"about_ca_system_score_codex":0.0061709187,"about_ca_system_score_gemma":0.0021125346,"threshold_uncertainty_score":0.04477334},"labels":[],"label_agreement":null},{"id":"W2783789685","doi":"10.1109/tsg.2018.2792322","title":"Distributionally Robust Chance-Constrained Energy Management for Islanded Microgrids","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":181,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Microgrid; Mathematical optimization; Robust optimization; Wind power; Energy management; Smart grid; Computer science; Moment (physics); Renewable energy; Distributed generation; Ambiguity; Electricity generation; Power (physics); Energy (signal processing); Engineering; Mathematics","score_opus":0.011707645687812544,"score_gpt":0.20241158387663305,"score_spread":0.1907039381888205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783789685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013063756,0.00025043785,0.98469317,0.0001826694,0.000024864099,0.000023116794,0.000038315742,0.00010070229,0.001623016],"genre_scores_gemma":[0.95589644,0.00031855612,0.041657533,0.000093553914,0.00005242237,0.000085431246,0.00008921241,0.000049346207,0.0017574514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992805,0.0002608615,0.000038062037,0.00014108651,0.00019287864,0.00008659158],"domain_scores_gemma":[0.9990601,0.0005091535,0.00019940546,0.000054648037,0.00012502907,0.000051726896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012972999,0.0010601651,0.0011593518,0.00047051776,0.00042654137,0.0012113699,0.001085798,0.0008156325,0.0012866394],"category_scores_gemma":[0.0028868522,0.0006334489,0.00097155484,0.0006690035,0.0008213143,0.001575659,0.0013276285,0.001100667,0.00013540052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001871689,0.0000078932935,0.00013229542,0.00001988809,0.000018520068,0.000040953128,0.000015549482,0.9862466,0.00035475913,0.008289332,0.0001897316,0.004665821],"study_design_scores_gemma":[0.000001878769,0.0000075916264,0.000033084383,0.000001602442,0.00000256144,0.0000049435334,0.0000027799101,0.99689674,0.00008216177,0.0028821202,0.0000813502,0.000003192397],"about_ca_topic_score_codex":0.0046686335,"about_ca_topic_score_gemma":0.0031998355,"teacher_disagreement_score":0.0046686335,"about_ca_system_score_codex":0.0009515882,"about_ca_system_score_gemma":0.0009957597,"threshold_uncertainty_score":0.009282887},"labels":[],"label_agreement":null},{"id":"W27854292","doi":"10.3390/pharmaceutics8040033","title":"Encouraging Sustainable Energy Use in the Office with Persuasive Mobile Information Systems","year":2014,"lang":"en","type":"article","venue":"International Conference on Information Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Queen's University; McGill University","funders":"","keywords":"Computer science; Persuasive technology; Energy (signal processing); Environmental economics; Persuasion","score_opus":0.010863580342508021,"score_gpt":0.20330080261611946,"score_spread":0.19243722227361143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W27854292","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3664592,0.013202594,0.06733222,0.01782805,0.00091975264,0.00037198453,0.0003286315,0.0012751538,0.53228235],"genre_scores_gemma":[0.8805548,0.008224432,0.038994957,0.0017107733,0.00021969687,0.0001760514,0.00027079697,0.00029658948,0.069552],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991677,0.0002540198,0.000027353413,0.00008184356,0.00034690637,0.00012226806],"domain_scores_gemma":[0.99937314,0.00019371335,0.00008545465,0.000075393036,0.0001994413,0.00007297497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090297393,0.00034970237,0.0001796557,0.000731419,0.00083281595,0.0023056222,0.0006488072,0.0007794243,0.010978267],"category_scores_gemma":[0.0015296079,0.00010038014,0.0002412896,0.0006972087,0.00046929784,0.0021194112,0.002227158,0.00044010676,0.0041027144],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018587416,0.0007130842,0.010016254,0.0011046234,0.000051474308,0.0010952649,0.003363131,0.0013567877,0.04677086,0.024769181,0.026010295,0.8845631],"study_design_scores_gemma":[0.000044762368,0.00070169056,0.013181296,0.0008239953,0.000056368684,0.0011402512,0.014122411,0.0030550037,0.063082285,0.025066216,0.8786493,0.000076486365],"about_ca_topic_score_codex":0.0005654584,"about_ca_topic_score_gemma":0.0016401113,"teacher_disagreement_score":0.010978267,"about_ca_system_score_codex":0.00036816593,"about_ca_system_score_gemma":0.0007584622,"threshold_uncertainty_score":0.03672594},"labels":[],"label_agreement":null},{"id":"W2785621755","doi":"10.1109/jiot.2018.2805899","title":"A fog-based internet of energy architecture for transactive energy management systems","year":2018,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":163,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Computer network; Smart grid; Cloud computing; Distributed computing; Energy consumption; The Internet; Interoperability; Server; Operating system","score_opus":0.00798792106323306,"score_gpt":0.2029918080253302,"score_spread":0.19500388696209714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785621755","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06316914,0.0012684616,0.9056655,0.00064013235,0.00039126383,0.00031252648,0.00015316246,0.0029278425,0.025471926],"genre_scores_gemma":[0.81340796,0.0007077933,0.17729571,0.00043779262,0.00005007844,0.00014050245,0.00022951854,0.00007174685,0.007658922],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997998,0.000028502438,0.000014947767,0.0000481933,0.000061469524,0.000047134945],"domain_scores_gemma":[0.99985373,0.000013990272,0.000011660629,0.000029653074,0.00006827205,0.000022629998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002660415,0.00042014022,0.0003676351,0.00033394826,0.0009122082,0.0012038402,0.0012065293,0.0007620681,0.0013674535],"category_scores_gemma":[0.00029920985,0.00019642933,0.0005220183,0.0003643682,0.00041294747,0.0011893575,0.0009899527,0.0006897289,0.0003866507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072141667,0.00066430174,0.0052084415,0.0005509771,0.0004124818,0.0017912079,0.0007499043,0.39723852,0.10594814,0.1486143,0.02766772,0.31043258],"study_design_scores_gemma":[0.000033082637,0.00021181622,0.0012059576,0.00004029539,0.00008820447,0.00032571945,0.000108356755,0.93832314,0.0124384025,0.015827311,0.031341664,0.00005603901],"about_ca_topic_score_codex":0.0064595374,"about_ca_topic_score_gemma":0.0110751,"teacher_disagreement_score":0.0064595374,"about_ca_system_score_codex":0.0008080531,"about_ca_system_score_gemma":0.0009878267,"threshold_uncertainty_score":0.012843847},"labels":[],"label_agreement":null},{"id":"W2785933625","doi":"10.1145/3177755","title":"An Online Emergency Demand Response Mechanism for Cloud Computing","year":2018,"lang":"en","type":"article","venue":"ACM Transactions on Modeling and Performance Evaluation of Computing Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Cloud computing; Computer science; Server; Provisioning; Online algorithm; Mechanism design; Scheduling (production processes); Distributed computing; Database; Mathematical optimization; Operating system; Algorithm; Microeconomics","score_opus":0.06715490519883746,"score_gpt":0.30869157979901923,"score_spread":0.24153667460018177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785933625","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04502717,0.0001747396,0.9468871,0.0005651381,0.00013435406,0.00030334495,0.00013422458,0.00063067634,0.0061433804],"genre_scores_gemma":[0.88201237,0.00012758617,0.11340566,0.00019182454,0.00008594762,0.00022589073,0.00012068561,0.00007591943,0.0037541399],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99715495,0.001178358,0.00011752436,0.0004292918,0.000676455,0.0004433014],"domain_scores_gemma":[0.99544096,0.0022023497,0.00059696863,0.00087493804,0.0005681609,0.00031652002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039103413,0.00080190407,0.00092556875,0.00046521903,0.0008864736,0.001964295,0.002741248,0.0012647007,0.0037516498],"category_scores_gemma":[0.009097881,0.00040383905,0.00066030904,0.00071878184,0.0011886611,0.00381106,0.0019330408,0.0017719766,0.0004945674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010997702,0.00095525134,0.0015636686,0.00034889762,0.00010764656,0.0005529406,0.00032124243,0.6016617,0.015526593,0.27375022,0.007920721,0.096191354],"study_design_scores_gemma":[0.00007296022,0.0001544422,0.00015677007,0.000012145758,0.0000139823205,0.00013784746,0.000048564547,0.95736825,0.0019744136,0.03689,0.003147298,0.000023356388],"about_ca_topic_score_codex":0.00084196177,"about_ca_topic_score_gemma":0.00072909886,"teacher_disagreement_score":0.0039103413,"about_ca_system_score_codex":0.0013376169,"about_ca_system_score_gemma":0.0020386802,"threshold_uncertainty_score":0.02068013},"labels":[],"label_agreement":null},{"id":"W2786184176","doi":"10.1109/epec.2017.8286219","title":"Evaluation of electric vehicle penetration in a residential sector under demand response considering both cost and convenience","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Penetration (warfare); Electric vehicle; Automotive engineering; Computer science; Engineering; Electrical engineering; Electricity; Operations research","score_opus":0.03819540315975632,"score_gpt":0.27354209298252585,"score_spread":0.23534668982276952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786184176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9918458,0.000049399336,0.0057788086,0.00004104181,0.000004102301,0.000015450563,0.0000848089,0.000048772206,0.002131761],"genre_scores_gemma":[0.9994692,0.000014803581,0.00032913647,0.0000021692315,6.812972e-7,0.000002931767,0.000040836356,0.0000025934687,0.00013758187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949324,0.00020884095,0.000020427833,0.000055582226,0.00012889112,0.00009303301],"domain_scores_gemma":[0.9981384,0.0011128237,0.00017863602,0.00009258937,0.00040836472,0.00006916974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007887032,0.00044664266,0.00032187538,0.0005157185,0.00017232064,0.00051140215,0.0003886292,0.00040891577,0.0011115654],"category_scores_gemma":[0.0027690846,0.0001611773,0.00029139896,0.0008893832,0.00024224832,0.0009745238,0.00034196093,0.00025472965,0.00017014165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009664726,0.00024597955,0.09373522,0.00010423221,0.000081846665,0.0006174597,0.00012205636,0.86248374,0.010030369,0.0017753169,0.00043516528,0.029402124],"study_design_scores_gemma":[0.000009180442,0.00044752896,0.034970816,0.0000058282867,0.000035224,0.00015457833,0.0003026979,0.958383,0.0050404686,0.00041091876,0.00022019494,0.000019562525],"about_ca_topic_score_codex":0.0051730783,"about_ca_topic_score_gemma":0.003816794,"teacher_disagreement_score":0.0051730783,"about_ca_system_score_codex":0.00062456855,"about_ca_system_score_gemma":0.0002661927,"threshold_uncertainty_score":0.010285974},"labels":[],"label_agreement":null},{"id":"W2786621724","doi":"10.1109/pesgm.2017.8274325","title":"Energy management in multi-microgrid systems — development and assessment","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; University of British Columbia","funders":"","keywords":"Microgrid; Energy management; Reliability engineering; Computer science; Distributed generation; Energy management system; Robustness (evolution); Energy storage; Probabilistic logic; Smart grid; Photovoltaic system; Energy consumption; Renewable energy; Engineering; Energy (signal processing); Electrical engineering","score_opus":0.024550356265005253,"score_gpt":0.2513470267586028,"score_spread":0.22679667049359756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786621724","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21653219,0.008496746,0.7539614,0.0009503847,0.000068106856,0.00038253632,0.00029535108,0.0005082916,0.018805033],"genre_scores_gemma":[0.9300793,0.0027833937,0.06528001,0.00003347231,0.000029040726,0.00012663209,0.00014502637,0.000027098251,0.0014960567],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995473,0.00016954988,0.000032002303,0.00004638849,0.00017435387,0.000030389834],"domain_scores_gemma":[0.99950004,0.00014783093,0.000111398316,0.00006896867,0.00013822844,0.000033548535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001328598,0.0007835568,0.0004769883,0.00068849453,0.00020041589,0.0013818647,0.00081849337,0.00066951284,0.00076455827],"category_scores_gemma":[0.001157187,0.00029946098,0.0004736651,0.0008194623,0.00044945508,0.0018284153,0.00096653454,0.0005299947,0.00016393735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004938459,0.00006979051,0.0044003758,0.00017984392,0.000060127844,0.00009061984,0.000026852369,0.92156005,0.0019380652,0.008236867,0.00040617137,0.062981926],"study_design_scores_gemma":[0.0000040195027,0.00011925026,0.0015678852,0.000027081427,0.000011449143,0.000037595546,0.000041049003,0.9913897,0.0019437574,0.0035865896,0.0012616756,0.000009997574],"about_ca_topic_score_codex":0.0018637255,"about_ca_topic_score_gemma":0.0020207623,"teacher_disagreement_score":0.0018637255,"about_ca_system_score_codex":0.00088458194,"about_ca_system_score_gemma":0.0008296967,"threshold_uncertainty_score":0.007026434},"labels":[],"label_agreement":null},{"id":"W2787324491","doi":"10.1109/epec.2017.8286168","title":"Dispatching thermostatically controlled loads for frequency regulation using adversarial multi-armed bandits","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Regret; Demand response; Adversarial system; Computer science; Mathematical optimization; SIGNAL (programming language); Grid; Energy (signal processing); Smart grid; Engineering; Artificial intelligence; Mathematics; Machine learning; Electricity; Electrical engineering","score_opus":0.03408832669225226,"score_gpt":0.2782604388812595,"score_spread":0.24417211218900725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787324491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.115719244,0.00033136492,0.8760167,0.0009575332,0.00009214343,0.000099375546,0.000112877344,0.00069931865,0.005971436],"genre_scores_gemma":[0.9801718,0.00006528056,0.017356636,0.00019932709,0.0000393535,0.00006777327,0.00004571813,0.000028165101,0.0020259148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999303,0.00030081742,0.000027511429,0.0001315557,0.0000933652,0.00014373007],"domain_scores_gemma":[0.997006,0.0021653925,0.00040518685,0.00012875121,0.00016505786,0.00012961349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015982174,0.0012116971,0.0011031984,0.00036299267,0.0004214648,0.00096645864,0.0009825751,0.0012597446,0.002533972],"category_scores_gemma":[0.0047621783,0.00041612168,0.0004864262,0.0003427374,0.0013002971,0.0009904909,0.0011141034,0.0016196009,0.00043255888],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011475533,0.00003157599,0.00028936175,0.00001569379,0.000016596492,0.000028265797,0.000017005288,0.9900552,0.000535051,0.0028872539,0.0003831817,0.005626037],"study_design_scores_gemma":[0.0000058294677,0.000015508627,0.00003261833,0.0000018614461,0.0000022356917,0.0000040182053,0.0000030602,0.9986199,0.00014361896,0.001114137,0.00005498548,0.000002215228],"about_ca_topic_score_codex":0.0043800236,"about_ca_topic_score_gemma":0.0040662256,"teacher_disagreement_score":0.0043800236,"about_ca_system_score_codex":0.0007988974,"about_ca_system_score_gemma":0.0008613084,"threshold_uncertainty_score":0.008709073},"labels":[],"label_agreement":null},{"id":"W2787413105","doi":"10.1109/epec.2017.8286202","title":"An online framework for integration of demand response in residential load management","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Load management; Incentive; Computer science; Scheduling (production processes); Reliability (semiconductor); Time horizon; Power consumption; Demand management; Consumption (sociology); Matching (statistics); Operations research; Electric power system; Reliability engineering; Environmental economics; Electricity; Power (physics); Operations management; Business; Engineering; Economics; Microeconomics","score_opus":0.02429012760183366,"score_gpt":0.29132161599563317,"score_spread":0.26703148839379953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787413105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027048811,0.00005051588,0.9926004,0.00016156328,0.000029696754,0.00005536778,0.000048136393,0.00075506093,0.0035944167],"genre_scores_gemma":[0.47175613,0.00020186129,0.5195859,0.00016573521,0.0001051578,0.00030602384,0.00027697676,0.00027775258,0.0073244874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905676,0.00034567076,0.000044541197,0.00019201972,0.0002456855,0.00011537109],"domain_scores_gemma":[0.99930334,0.00028625314,0.000068223155,0.00014846651,0.00012367609,0.000069978225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001560245,0.00066092977,0.00086294935,0.0004275149,0.000533193,0.0016778422,0.0021968747,0.0010841076,0.007814092],"category_scores_gemma":[0.0025184278,0.00048270152,0.0007040922,0.0006204111,0.00076192786,0.0022298978,0.0018926464,0.0016458076,0.0012137463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011251663,0.00041466087,0.0010664007,0.00011061947,0.00005596019,0.0002954805,0.00019745683,0.6773445,0.003626694,0.21738781,0.0050009326,0.09438707],"study_design_scores_gemma":[0.000011359963,0.000019077812,0.000056825123,0.000004902728,0.000005276882,0.000023008239,0.0000139444,0.9780849,0.0004310264,0.018314447,0.0030285642,0.0000066198036],"about_ca_topic_score_codex":0.006371997,"about_ca_topic_score_gemma":0.0071147694,"teacher_disagreement_score":0.007814092,"about_ca_system_score_codex":0.0011287761,"about_ca_system_score_gemma":0.001682225,"threshold_uncertainty_score":0.02614069},"labels":[],"label_agreement":null},{"id":"W2787646714","doi":"10.1109/ithings-greencom-cpscom-smartdata.2017.83","title":"Double-Q Learning-Based DVFS for Multi-core Real-Time Systems","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"St. Francis Xavier University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Estimator; Energy consumption; Scheme (mathematics); Energy (signal processing); Selection (genetic algorithm); Selection algorithm; Q-learning; Action selection; Algorithm; Reinforcement learning; Artificial intelligence; Engineering; Mathematics","score_opus":0.05451329181833204,"score_gpt":0.2747960816084416,"score_spread":0.22028278979010957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787646714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020181581,0.00043217148,0.9774984,0.00016088979,0.00007424821,0.000071284325,0.000026258975,0.0005480835,0.0010071087],"genre_scores_gemma":[0.9020613,0.000161748,0.09606531,0.00014883328,0.000057065296,0.00010546092,0.00006440619,0.000051001898,0.0012848137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988016,0.0003744943,0.00008428239,0.0002269554,0.00038880238,0.000123908],"domain_scores_gemma":[0.9966453,0.0019200286,0.00028066727,0.0003225809,0.0006798322,0.00015165433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024931927,0.0006441333,0.0010124929,0.00059178733,0.000595099,0.000787416,0.0016314586,0.00065449515,0.0017006398],"category_scores_gemma":[0.008056647,0.0002529414,0.00025161103,0.0006493373,0.0007556097,0.0010768387,0.00081240846,0.0010814813,0.00023247085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040366087,0.00025593836,0.0020824745,0.00013151029,0.00004571033,0.00010625061,0.00014006716,0.64721304,0.0054353797,0.009074137,0.0024671224,0.33264473],"study_design_scores_gemma":[0.000020049727,0.000051760115,0.0001599868,0.0000047803287,0.0000032252512,0.000029531624,0.000007117311,0.9960075,0.0009985663,0.0022380361,0.00047416153,0.0000053668364],"about_ca_topic_score_codex":0.0042972574,"about_ca_topic_score_gemma":0.0036429374,"teacher_disagreement_score":0.0042972574,"about_ca_system_score_codex":0.001038822,"about_ca_system_score_gemma":0.00130102,"threshold_uncertainty_score":0.013185382},"labels":[],"label_agreement":null},{"id":"W2789321149","doi":"10.1109/tsg.2018.2810830","title":"Data Center Demand Response in Deregulated Electricity Markets","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Chinese University of Hong Kong","keywords":"Demand response; Electricity; Electricity market; Workload; Computer science; Load management; Microeconomics; Data center; Business; Industrial organization; Economics; Engineering","score_opus":0.019481598883329444,"score_gpt":0.2359022073862782,"score_spread":0.21642060850294875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2789321149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4976061,0.000350087,0.4874446,0.00093372836,0.000085022635,0.00020143339,0.00026170394,0.00029851464,0.012818817],"genre_scores_gemma":[0.9861472,0.00006047226,0.012125028,0.00006868461,0.000007146657,0.000046178804,0.00004519244,0.000026830385,0.0014732624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877185,0.0006203327,0.000029575007,0.00021824687,0.00009895126,0.00026108904],"domain_scores_gemma":[0.99805117,0.001192168,0.000278438,0.00009652136,0.0001888168,0.00019290204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022298605,0.0005963399,0.0010062663,0.00032424415,0.00061579223,0.0016044353,0.0015423173,0.001347078,0.0026423326],"category_scores_gemma":[0.004126956,0.0005713824,0.00045047508,0.00049661694,0.0010478761,0.0019173658,0.00132705,0.0011644536,0.0002066576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001711096,0.00007273309,0.0005287917,0.000029769719,0.000023403829,0.00014224324,0.0000638001,0.9715683,0.00097485044,0.02112251,0.00063087104,0.0046716393],"study_design_scores_gemma":[0.000021952113,0.00001935904,0.00008263415,0.0000015724468,0.0000031496431,0.000013880481,0.000041269403,0.99397695,0.00019520358,0.0054273224,0.00021205583,0.0000046364053],"about_ca_topic_score_codex":0.0066041527,"about_ca_topic_score_gemma":0.0041978923,"teacher_disagreement_score":0.0066041527,"about_ca_system_score_codex":0.0018449859,"about_ca_system_score_gemma":0.001155702,"threshold_uncertainty_score":0.013386369},"labels":[],"label_agreement":null},{"id":"W2791314885","doi":"10.1109/tii.2018.2806936","title":"Unsupervised Nonintrusive Extraction of Electrical Vehicle Charging Load Patterns","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart meter; Smart grid; Computer science; Reliability (semiconductor); Metre; Electricity meter; Grid; Real-time computing; Electric vehicle; Interference (communication); Electrical load; Sampling (signal processing); Power (physics); Automotive engineering; Engineering; Electrical engineering; Voltage; Telecommunications","score_opus":0.02505287703280818,"score_gpt":0.23333793901699568,"score_spread":0.2082850619841875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791314885","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20444013,0.00025411093,0.7892513,0.00013961016,0.000049969414,0.00010445255,0.00090900355,0.0018919082,0.0029595708],"genre_scores_gemma":[0.81542045,0.00023685192,0.17580669,0.000070570226,0.00008815787,0.00015023512,0.0034886904,0.00019532096,0.0045430013],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996712,0.00005102792,0.000023809029,0.000094534094,0.00011019908,0.000049115817],"domain_scores_gemma":[0.99951327,0.00017774511,0.00007819498,0.00009595517,0.00011735345,0.000017517918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021377642,0.0006257697,0.0005364788,0.0012618226,0.00022720428,0.00047260235,0.0005603937,0.0003235938,0.0006832051],"category_scores_gemma":[0.0013052499,0.00021446178,0.000387367,0.0011658986,0.00022873818,0.00068203243,0.00057873316,0.0004226106,0.00071332924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044679723,0.0004627534,0.019383084,0.00015785481,0.00013480216,0.0005082512,0.00029223508,0.09914667,0.06349597,0.0032195859,0.004711634,0.80804026],"study_design_scores_gemma":[0.00001975635,0.00008147191,0.013750707,0.000014817398,0.000032169875,0.0003467908,0.00014561745,0.9521128,0.023883676,0.0048077716,0.0047794576,0.000025053518],"about_ca_topic_score_codex":0.0013400338,"about_ca_topic_score_gemma":0.0030721652,"teacher_disagreement_score":0.0013400338,"about_ca_system_score_codex":0.00016956283,"about_ca_system_score_gemma":0.00044786476,"threshold_uncertainty_score":0.0026644468},"labels":[],"label_agreement":null},{"id":"W2791838709","doi":"10.3390/en11020452","title":"Big Data Mining of Energy Time Series for Behavioral Analytics and Energy Consumption Forecasting","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":230,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Energy consumption; Data mining; Cluster analysis; Context (archaeology); Time series; Support vector machine; Data stream mining; Energy (signal processing); Multilayer perceptron; Naive Bayes classifier; Machine learning; Big data; Perceptron; Artificial intelligence; Artificial neural network; Statistics; Engineering","score_opus":0.0881932956125111,"score_gpt":0.2560202266840608,"score_spread":0.16782693107154972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791838709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13270515,0.006723813,0.817648,0.003819126,0.0009034488,0.00045026705,0.020250086,0.0086892275,0.008810883],"genre_scores_gemma":[0.7722924,0.003572244,0.19986443,0.00045714248,0.00035408884,0.00039678236,0.021029528,0.00022039533,0.0018130359],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989925,0.00019681505,0.00015316589,0.00024660397,0.00034858298,0.00006233983],"domain_scores_gemma":[0.9976871,0.000940502,0.0003506371,0.0004596898,0.0004860416,0.00007595903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011948592,0.0014105546,0.0010499981,0.0036027352,0.00047297546,0.001297641,0.0012547676,0.000730383,0.001189058],"category_scores_gemma":[0.0049380814,0.00036012713,0.0010632763,0.0049226973,0.00028308472,0.0020199472,0.0007327473,0.0013078108,0.0007929799],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036671408,0.0010374865,0.07090248,0.0013118528,0.00075298396,0.0007183701,0.00037615263,0.21259226,0.012034354,0.015730724,0.033811152,0.6503655],"study_design_scores_gemma":[0.000015241303,0.000072461175,0.016021334,0.00012049051,0.00007068885,0.00016943393,0.00034415122,0.94346565,0.0061477367,0.022788335,0.010744311,0.000040085884],"about_ca_topic_score_codex":0.0050941505,"about_ca_topic_score_gemma":0.0065963464,"teacher_disagreement_score":0.0050941505,"about_ca_system_score_codex":0.0005936408,"about_ca_system_score_gemma":0.0007695379,"threshold_uncertainty_score":0.010128975},"labels":[],"label_agreement":null},{"id":"W2793519996","doi":"10.1787/6ad4d5e3-en","title":"Leveraging the Smart Grid","year":2018,"lang":"en","type":"paratext","venue":"OECD environment working papers","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"University of Ottawa","keywords":"Smart grid; Electricity; Consumption (sociology); Environmental economics; Demand response; Electricity demand; Grid; Business; Computer science; Economics; Engineering; Geography; Electricity generation; Electrical engineering; Power (physics)","score_opus":0.011018346204915427,"score_gpt":0.1732292297382272,"score_spread":0.16221088353331176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793519996","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024480665,0.0059177666,0.097657025,0.08824896,0.0037820505,0.00014437095,0.0019124402,0.0030416287,0.77481514],"genre_scores_gemma":[0.7547228,0.019779915,0.043594394,0.01247285,0.0029479105,0.00022789888,0.0047924826,0.001036755,0.16042513],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983088,0.00048088242,0.00007121124,0.00020999604,0.00069032673,0.00023882698],"domain_scores_gemma":[0.9978822,0.00062668364,0.000111733396,0.00069908873,0.0004363477,0.00024403258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002241429,0.00041189836,0.00024214695,0.000950035,0.0007231719,0.0058255163,0.00080649846,0.0012858926,0.019387955],"category_scores_gemma":[0.0069439434,0.00019757233,0.0003200489,0.001958762,0.001338588,0.008734408,0.0061698486,0.001996063,0.0072065867],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007388098,0.000055572174,0.0030099147,0.00017152831,0.00004061616,0.0003638624,0.0006686062,0.007812723,0.0010229299,0.49477768,0.18510634,0.30689642],"study_design_scores_gemma":[0.000015061134,0.000029077812,0.0009307513,0.00021829124,0.000012614231,0.00012802293,0.00041378994,0.005886873,0.0008476641,0.17809127,0.81340575,0.000020920406],"about_ca_topic_score_codex":0.0032001385,"about_ca_topic_score_gemma":0.004810346,"teacher_disagreement_score":0.019387955,"about_ca_system_score_codex":0.0011780368,"about_ca_system_score_gemma":0.0021363106,"threshold_uncertainty_score":0.06485921},"labels":[],"label_agreement":null},{"id":"W2794165757","doi":"10.1016/j.automatica.2018.11.029","title":"An integral control formulation of mean field game based large scale coordination of loads in smart grids","year":2018,"lang":"en","type":"preprint","venue":"Automatica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Robustness (evolution); Nash equilibrium; Computer science; Smoothing; Piecewise; Control theory (sociology); Mathematics; Control (management); Mathematical analysis","score_opus":0.006519868595403304,"score_gpt":0.23225839388576028,"score_spread":0.22573852529035698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794165757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030684086,0.0003528409,0.95062363,0.0010427973,0.00019123056,0.00007451147,0.00009652143,0.00009399229,0.016840363],"genre_scores_gemma":[0.9487536,0.00026975505,0.036523536,0.00023493946,0.00010755892,0.00016100238,0.00006998037,0.00007044065,0.013809232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943715,0.00022904934,0.000015325648,0.000109566914,0.00011549221,0.00009338441],"domain_scores_gemma":[0.99855,0.00093395484,0.00011830488,0.00004393948,0.0001994474,0.00015429071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017824906,0.0011088849,0.0016988695,0.00050058967,0.0005139058,0.0019139069,0.001794575,0.0022232092,0.0053495443],"category_scores_gemma":[0.0040633664,0.0006398439,0.0006592825,0.00048633027,0.0018350711,0.0015244358,0.0017354072,0.0018325007,0.0002438761],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006088259,0.00004998732,0.00019611877,0.000064693086,0.000028129776,0.0000778349,0.00006659801,0.89407265,0.00075855426,0.09912,0.0015076025,0.0039970567],"study_design_scores_gemma":[0.000007704306,0.000011506938,0.000024657073,0.000002246158,0.000003422262,0.0000044906774,0.0000070271235,0.9902934,0.000036329817,0.009463819,0.00014253192,0.000002852108],"about_ca_topic_score_codex":0.008045021,"about_ca_topic_score_gemma":0.006093737,"teacher_disagreement_score":0.008045021,"about_ca_system_score_codex":0.0017725992,"about_ca_system_score_gemma":0.0015441711,"threshold_uncertainty_score":0.017895997},"labels":[],"label_agreement":null},{"id":"W2794513987","doi":"10.1049/pbpo130e_ch13","title":"Conservation and demand management in community energy systems","year":2018,"lang":"en","type":"book-chapter","venue":"Institution of Engineering and Technology eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Backup; Incentive; Unit (ring theory); Energy conservation; Order (exchange); Environmental economics; Electricity; Grid; Peak demand; Consumption (sociology); Scale (ratio); Computer science; Economics; Microeconomics; Engineering; Finance; Geography; Mathematics; Electrical engineering","score_opus":0.00906078507614136,"score_gpt":0.17412400849005336,"score_spread":0.165063223413912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794513987","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2141328,0.0032677997,0.57700735,0.0128754135,0.0003141198,0.00041863375,0.0007703077,0.0008006313,0.19041294],"genre_scores_gemma":[0.96390766,0.00086179975,0.018727995,0.00018423122,0.00008520345,0.00009601166,0.00019849827,0.00006504948,0.01587341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903107,0.00037379382,0.000038580405,0.00017182967,0.00022553994,0.00015917857],"domain_scores_gemma":[0.99888796,0.000513477,0.0001207174,0.00009868926,0.0002656111,0.000113483664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001161504,0.00041143372,0.000450465,0.0005889682,0.0010803137,0.0029059115,0.0014075696,0.0010441397,0.0065657487],"category_scores_gemma":[0.0032231766,0.00034692205,0.00050550234,0.0013433472,0.0010034842,0.0026224386,0.0015770931,0.0010976059,0.00039083182],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006557899,0.00022359344,0.0035502843,0.00017005178,0.000057060624,0.000292602,0.0004526634,0.6053475,0.00089123705,0.30965483,0.010830979,0.068463586],"study_design_scores_gemma":[0.000022529619,0.00003373431,0.0010141346,0.000032483673,0.000010791495,0.00008103299,0.0005321447,0.813708,0.00028735527,0.1644794,0.019775512,0.000022763194],"about_ca_topic_score_codex":0.018976355,"about_ca_topic_score_gemma":0.013714475,"teacher_disagreement_score":0.018976355,"about_ca_system_score_codex":0.003241517,"about_ca_system_score_gemma":0.001979975,"threshold_uncertainty_score":0.037731826},"labels":[],"label_agreement":null},{"id":"W2794960695","doi":"10.1016/j.apenergy.2018.03.094","title":"Energy consumption analysis of residential swimming pools for peak load shaving","year":2018,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"State Grid Corporation of China; National Natural Science Foundation of China","keywords":"Peaking power plant; Energy consumption; Peak load; Consumption (sociology); Environmental science; Energy (signal processing); Peak demand; Cooling load; Automotive engineering; Engineering; Electricity; Renewable energy; Air conditioning; Statistics; Electrical engineering","score_opus":0.011707427392664404,"score_gpt":0.22192510621610329,"score_spread":0.2102176788234389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794960695","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99395883,0.000029409002,0.0018484552,0.000024698254,0.0000040516297,0.00001869216,0.00041018394,0.000050924908,0.0036547673],"genre_scores_gemma":[0.9977469,0.000016763723,0.00024266029,0.000003754466,8.092522e-7,0.000009574774,0.00024713905,0.00000833796,0.0017241029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998896,0.000016830161,0.000004424443,0.000020972777,0.000034066336,0.000034082164],"domain_scores_gemma":[0.9998795,0.000043190375,0.000006916954,0.00000785711,0.000051394916,0.000011210463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013639548,0.00035477156,0.00039174422,0.0005801945,0.0004011377,0.0003693621,0.00037910705,0.00030563172,0.0042492957],"category_scores_gemma":[0.00022352673,0.00017986278,0.0005068074,0.00079648395,0.00013983647,0.0003366683,0.0001933855,0.00016177316,0.0005410317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007911451,0.0008524145,0.15712357,0.000539513,0.0003036489,0.0015983405,0.00062455825,0.61807483,0.08921765,0.0030199415,0.0062629594,0.114471205],"study_design_scores_gemma":[0.00003655687,0.0007204436,0.20575193,0.000018546962,0.00011589564,0.00016342111,0.0011247616,0.7609413,0.028723853,0.000646123,0.0017228158,0.00003430092],"about_ca_topic_score_codex":0.0130651025,"about_ca_topic_score_gemma":0.022285353,"teacher_disagreement_score":0.0130651025,"about_ca_system_score_codex":0.000623298,"about_ca_system_score_gemma":0.00032565775,"threshold_uncertainty_score":0.025978088},"labels":[],"label_agreement":null},{"id":"W2795298263","doi":"10.1109/jproc.2018.2809468","title":"Versatile Modeling Platform for Cooperative Energy Management Systems in Smart Cities","year":2018,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Core Research for Evolutional Science and Technology; Waseda University; National Science Foundation","keywords":"Sustainability; Computer science; Photovoltaic system; Energy management; Systems engineering; Energy consumption; Range (aeronautics); Energy (signal processing); Engineering; Electrical engineering; Aerospace engineering","score_opus":0.0175073626536058,"score_gpt":0.20195699188778002,"score_spread":0.1844496292341742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795298263","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013775326,0.00006788732,0.97020954,0.00020759576,0.000069269125,0.00011707312,0.00034909786,0.0024814971,0.012722786],"genre_scores_gemma":[0.47137636,0.00047216832,0.50742173,0.00013839267,0.00009048779,0.0009396943,0.0012966458,0.000864035,0.017400479],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960047,0.00014287567,0.000026201118,0.00006380807,0.00012095417,0.00004565457],"domain_scores_gemma":[0.9996878,0.00012558543,0.000025976367,0.00006687778,0.0000686182,0.000025148289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008331696,0.00095937157,0.00078247924,0.0005216087,0.00073988904,0.0015763051,0.001637203,0.001350621,0.0075586042],"category_scores_gemma":[0.0011341824,0.0005442114,0.0013785457,0.00047608864,0.00063741684,0.0016527498,0.0020328804,0.0013429014,0.0016469274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022992179,0.000033742213,0.00032917774,0.00003284742,0.000017400038,0.00009037577,0.00010060171,0.94999963,0.0014183657,0.040040616,0.0008876355,0.0070266016],"study_design_scores_gemma":[0.000008929129,0.000009855616,0.000041402698,0.0000065895874,0.0000047066846,0.000009117997,0.000016269369,0.98572206,0.0005224446,0.0073197465,0.006332973,0.000006032378],"about_ca_topic_score_codex":0.0075239753,"about_ca_topic_score_gemma":0.005674951,"teacher_disagreement_score":0.0075586042,"about_ca_system_score_codex":0.0008064232,"about_ca_system_score_gemma":0.0011511106,"threshold_uncertainty_score":0.025286078},"labels":[],"label_agreement":null},{"id":"W2795589408","doi":"10.1007/978-3-319-89656-4_43","title":"A Tool for Defining and Simulating Storage Strategies on the Smart Grid","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Computer science; Scripting language; Smart grid; Key (lock); Process (computing); Software; Grid; Computer data storage; Distributed computing; Electrical engineering; Operating system; Engineering","score_opus":0.0158727687446121,"score_gpt":0.22066822541112396,"score_spread":0.20479545666651186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795589408","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055807238,0.0001139852,0.9789327,0.00011061752,0.0001048239,0.00007539332,0.0007995847,0.006761495,0.007520736],"genre_scores_gemma":[0.16362327,0.0005837686,0.820269,0.00018400005,0.0000892403,0.00065180263,0.0020635466,0.003412665,0.0091226725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971527,0.000073114425,0.00003133476,0.000047178044,0.00010200959,0.000031028914],"domain_scores_gemma":[0.9989705,0.00061602064,0.000056816025,0.00016694635,0.00013351747,0.000056252615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008452563,0.0013349627,0.0014165619,0.0007914991,0.0009533473,0.0022666901,0.0034185916,0.0023615507,0.016990893],"category_scores_gemma":[0.0026195368,0.0011004275,0.0016738407,0.0009819438,0.0008813047,0.0019982185,0.0014411006,0.0020636793,0.0023666362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006487312,0.00008779376,0.0006267271,0.00018532205,0.00006786415,0.00018408881,0.00016042723,0.9036047,0.0027548003,0.059032533,0.006304252,0.026926689],"study_design_scores_gemma":[0.000021807873,0.000010485968,0.000042256197,0.00001734171,0.000011145916,0.000028360622,0.000011041158,0.9753798,0.00090344076,0.015733417,0.007831172,0.0000096559825],"about_ca_topic_score_codex":0.0055190064,"about_ca_topic_score_gemma":0.006017369,"teacher_disagreement_score":0.016990893,"about_ca_system_score_codex":0.00069291407,"about_ca_system_score_gemma":0.0010996577,"threshold_uncertainty_score":0.05684024},"labels":[],"label_agreement":null},{"id":"W2795934354","doi":"10.1109/tec.2018.2823334","title":"Analysis and Experimental Investigation of the Improved Distributed Electronic Load Controller","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Controller (irrigation); Chopper; Control theory (sociology); Engineering; Power (physics); Voltage; Thyristor; Computer science; Electrical engineering; Control (management)","score_opus":0.004040556483273221,"score_gpt":0.17757701882156537,"score_spread":0.17353646233829215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795934354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7754219,0.00060046546,0.19000587,0.0006135671,0.0005023317,0.0009811106,0.0008992669,0.0038657761,0.0271097],"genre_scores_gemma":[0.98501587,0.000075222015,0.011170923,0.000050741124,0.000015060911,0.0001454034,0.00013165551,0.00003494171,0.0033601336],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99903095,0.00010461348,0.000056615005,0.00020758617,0.00048899784,0.00011127183],"domain_scores_gemma":[0.99875224,0.0002731917,0.000107109176,0.00020514296,0.00060353434,0.000058689086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000761897,0.00055729307,0.00057098386,0.0006440915,0.0004571843,0.0007227741,0.0013748687,0.00090072636,0.0062313266],"category_scores_gemma":[0.0012741952,0.00017965179,0.00035005945,0.00034499343,0.00047087084,0.00080566393,0.0003885912,0.0005444732,0.0009866214],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026262908,0.0017604937,0.0063827997,0.0019093555,0.00018251658,0.0009798554,0.0007058909,0.06773536,0.7548287,0.0054617138,0.004716264,0.15271081],"study_design_scores_gemma":[0.00044695404,0.0070813014,0.0137851825,0.0000810237,0.0001837738,0.0003761111,0.00031628957,0.4139287,0.5455026,0.0009964702,0.017204693,0.00009686563],"about_ca_topic_score_codex":0.0012480678,"about_ca_topic_score_gemma":0.0009533796,"teacher_disagreement_score":0.0062313266,"about_ca_system_score_codex":0.0006011835,"about_ca_system_score_gemma":0.00048128,"threshold_uncertainty_score":0.02084589},"labels":[],"label_agreement":null},{"id":"W2796115129","doi":"10.1109/lcomm.2018.2822798","title":"Dynamic Pricing Mechanism in Smart Grid Communications Is Shaping Up","year":2018,"lang":"en","type":"article","venue":"IEEE Communications Letters","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Exfo Electro-Optical Engineering (Canada)","funders":"","keywords":"Dynamic pricing; Smart grid; Computer science; Demand response; Dynamic demand; Electricity; Load management; Supply and demand; Environmental economics; Key (lock); Electricity pricing; Electricity market; Microeconomics; Power (physics); Computer security; Economics","score_opus":0.03698678857456441,"score_gpt":0.26603147157523727,"score_spread":0.22904468300067285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2796115129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08702292,0.0037235168,0.8415683,0.0027853376,0.0014918091,0.00015066336,0.00016860706,0.0011433166,0.06194556],"genre_scores_gemma":[0.97188073,0.0008135694,0.020665387,0.00026578616,0.00020540402,0.000038766393,0.000042066877,0.00004776467,0.0060404944],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919194,0.00020503353,0.000036712456,0.00013376222,0.00028583035,0.00014673572],"domain_scores_gemma":[0.99932086,0.00019066267,0.00008743496,0.00018153488,0.00017921044,0.000040364037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000648985,0.00037655892,0.00051571947,0.00047461872,0.0007353454,0.002115785,0.001072029,0.0008950002,0.0034469722],"category_scores_gemma":[0.002373964,0.00020773844,0.00042053915,0.0009632858,0.0007371841,0.0024180214,0.0007340435,0.00092811335,0.0006929444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025886306,0.00013472163,0.0018605605,0.0001694857,0.00005362547,0.00074887794,0.0002294196,0.18766452,0.021478567,0.5679807,0.009253775,0.21016684],"study_design_scores_gemma":[0.000029583696,0.000121380166,0.00065058103,0.000032303207,0.000028210985,0.0005104275,0.00012134452,0.8298102,0.0077234106,0.1339179,0.0269965,0.000058098605],"about_ca_topic_score_codex":0.0013111457,"about_ca_topic_score_gemma":0.0007911684,"teacher_disagreement_score":0.0034469722,"about_ca_system_score_codex":0.0007212696,"about_ca_system_score_gemma":0.0007626587,"threshold_uncertainty_score":0.011531234},"labels":[],"label_agreement":null},{"id":"W2796211844","doi":"","title":"UPS Delivery System","year":2001,"lang":"en","type":"article","venue":"PDXScholar  (Portland State University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Delivery system; Computer science; Medicine; Biomedical engineering","score_opus":0.00477115524202574,"score_gpt":0.13143943993936905,"score_spread":0.12666828469734331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2796211844","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10960585,0.0017461478,0.114437684,0.0028372323,0.000979253,0.0027048641,0.023624662,0.03509495,0.7089693],"genre_scores_gemma":[0.49693555,0.0019257065,0.05857735,0.0008818999,0.0002051534,0.00084002106,0.034019116,0.0017781972,0.40483695],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910647,0.00012572443,0.00005900807,0.00016475354,0.00040701323,0.00013708018],"domain_scores_gemma":[0.99887484,0.00007129233,0.000054533997,0.00015918554,0.0007590097,0.000081151185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057203195,0.0005198975,0.0003412822,0.0015944502,0.0018230052,0.002463941,0.0009268771,0.00044658926,0.06296114],"category_scores_gemma":[0.001377978,0.00024866193,0.00028378135,0.0022371993,0.00027784336,0.0013019281,0.0014915215,0.0007386421,0.027001671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068971806,0.00034833362,0.014309294,0.0005853096,0.000044541528,0.0009978623,0.00084662077,0.014540594,0.012153738,0.030563844,0.34330502,0.5816152],"study_design_scores_gemma":[0.00008951027,0.00022786339,0.016438184,0.00018939604,0.000053412234,0.00075834384,0.0008942145,0.037725594,0.012749922,0.0027105291,0.9280758,0.00008714232],"about_ca_topic_score_codex":0.0540936,"about_ca_topic_score_gemma":0.042641975,"teacher_disagreement_score":0.06296114,"about_ca_system_score_codex":0.0027697762,"about_ca_system_score_gemma":0.002812253,"threshold_uncertainty_score":0.21062595},"labels":[],"label_agreement":null},{"id":"W2797042681","doi":"10.6000/1927-5129.2018.14.13","title":"An Estimation of the Impact of Uninterpretable Power Supply Systems on Electricity Distribution Utility of Pakistan","year":2018,"lang":"en","type":"article","venue":"Journal of Basic & Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic shortage; Electricity; Estimation; Power (physics); Mains electricity; Electricity generation; Business; Load Shedding; Environmental economics; Economics; Automotive engineering; Electric power system; Electrical engineering; Engineering","score_opus":0.008498169121823483,"score_gpt":0.2628050172761412,"score_spread":0.2543068481543177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797042681","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961957,0.0000561719,0.00037333986,0.00007327336,0.0000036381325,0.00001255318,0.00027078573,0.000011459301,0.0030030732],"genre_scores_gemma":[0.9994368,0.000055095265,0.00007203397,0.000003892118,0.0000011055414,0.0000016976475,0.00011987202,0.0000010535688,0.00030843323],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997328,0.0000555237,0.000015571062,0.000022656735,0.000106989115,0.00006635413],"domain_scores_gemma":[0.9987288,0.0005213895,0.00023222463,0.000045921606,0.00039627697,0.00007538454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025393307,0.00023186982,0.00014223154,0.00052271935,0.00046336598,0.00066699815,0.00023198615,0.00023000113,0.0023451776],"category_scores_gemma":[0.0015605482,0.00011811794,0.00022692131,0.00088466913,0.00025278784,0.00066599355,0.00036671732,0.00040184593,0.00028589767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074713974,0.00037486933,0.8374272,0.00019330776,0.0001138057,0.0052448395,0.001744222,0.09420795,0.0057109417,0.0021277783,0.0029547822,0.049153287],"study_design_scores_gemma":[0.000018560424,0.00062365533,0.90038407,0.00003855971,0.000079388534,0.0010131783,0.0074459207,0.083678104,0.0031263614,0.00086095143,0.002697409,0.000033864784],"about_ca_topic_score_codex":0.03487217,"about_ca_topic_score_gemma":0.037109263,"teacher_disagreement_score":0.03487217,"about_ca_system_score_codex":0.0014038193,"about_ca_system_score_gemma":0.00042038926,"threshold_uncertainty_score":0.06933838},"labels":[],"label_agreement":null},{"id":"W2797781454","doi":"10.1016/j.energy.2018.04.037","title":"Robust cost-risk tradeoff for day-ahead schedule optimization in residential microgrid system under worst-case conditional value-at-risk consideration","year":2018,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"Natural Science Foundation of Beijing Municipality; National Natural Science Foundation of China","keywords":"Microgrid; Expected shortfall; Schedule; Robust optimization; Electric power system; Stochastic programming; CVAR; Renewable energy; Electricity market; Demand response; Computer science; Hedge; Mathematical optimization; Electricity; Economics; Risk management; Engineering; Power (physics); Mathematics","score_opus":0.017381945552165372,"score_gpt":0.21521030159529958,"score_spread":0.1978283560431342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797781454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15618403,0.0021090521,0.8290209,0.0016598545,0.00017249645,0.00019121295,0.00048997503,0.00035999826,0.00981243],"genre_scores_gemma":[0.9887348,0.00021833267,0.009326941,0.000058543614,0.00003643559,0.000048121266,0.00009936908,0.00005401052,0.0014233474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983689,0.00071482774,0.000053286865,0.00022634254,0.0003310483,0.0003054848],"domain_scores_gemma":[0.99626297,0.0026949372,0.00031498025,0.00013515785,0.00042338966,0.00016859516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004276466,0.0018875458,0.002104395,0.0006810111,0.00061457354,0.0024857386,0.0015105918,0.0017362962,0.0028953422],"category_scores_gemma":[0.008261766,0.001181754,0.0008805572,0.0008012112,0.001033553,0.002151337,0.0016309267,0.002037339,0.00021097095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009113737,0.000014694749,0.00014197204,0.000041016043,0.000029295292,0.000041295967,0.000018205707,0.9942621,0.000333013,0.0026249615,0.0002638068,0.0021385753],"study_design_scores_gemma":[0.000005145574,0.000027160082,0.00010096807,0.0000042392585,0.000008778312,0.000009232155,0.000009442459,0.99806434,0.00010029475,0.0016196666,0.00004631785,0.0000044313056],"about_ca_topic_score_codex":0.006938057,"about_ca_topic_score_gemma":0.0049338867,"teacher_disagreement_score":0.006938057,"about_ca_system_score_codex":0.0021993753,"about_ca_system_score_gemma":0.0020525134,"threshold_uncertainty_score":0.022616386},"labels":[],"label_agreement":null},{"id":"W2798676575","doi":"10.1109/icit.2018.8352351","title":"Enabling winter behavior analysis on electrically heated residential buildings by smart sub-metering","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metering mode; Smart grid; Context (archaeology); Variety (cybernetics); Computer science; Limiting; Consistency (knowledge bases); Electricity; Load management; Systems engineering; Architectural engineering; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.006679134794632878,"score_gpt":0.21403654235305442,"score_spread":0.20735740755842152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2798676575","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8256151,0.00009827955,0.16369459,0.00010285218,0.000039415743,0.00012711468,0.00063841185,0.004633138,0.0050510457],"genre_scores_gemma":[0.98627895,0.000046905392,0.01265434,0.000017369153,0.0000074640984,0.00003507421,0.0002185842,0.000052277865,0.00068910606],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99989104,0.000027438267,0.000005123545,0.000029009925,0.000031387768,0.000016047396],"domain_scores_gemma":[0.9998665,0.000040258023,0.000018158367,0.00003129222,0.000029107758,0.000014799708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012489561,0.00043752306,0.00054447295,0.0003434054,0.0001987358,0.00041028415,0.0005603536,0.00023202886,0.0021852697],"category_scores_gemma":[0.00029716638,0.00012753862,0.00025911749,0.00033650288,0.0001822849,0.00036081267,0.00031358743,0.00022449662,0.0005302355],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016647098,0.0007790746,0.07010688,0.0005451462,0.00018721656,0.0007438024,0.0015729666,0.16380377,0.39930016,0.0017362421,0.0034932203,0.35606682],"study_design_scores_gemma":[0.000048448943,0.00037138362,0.04832856,0.000020997397,0.00007541756,0.00019459228,0.00041641016,0.86015314,0.085341595,0.002139596,0.0028611375,0.000048691796],"about_ca_topic_score_codex":0.0021059518,"about_ca_topic_score_gemma":0.0036878632,"teacher_disagreement_score":0.0021852697,"about_ca_system_score_codex":0.0002238748,"about_ca_system_score_gemma":0.00015551336,"threshold_uncertainty_score":0.0073103905},"labels":[],"label_agreement":null},{"id":"W2799921325","doi":"10.1109/tpwrs.2018.2834913","title":"A Dynamical Systems Approach to Modeling and Analysis of Transactive Energy Coordination","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Population; Grid; Computer science; Synchronization (alternating current); Distributed generation; Mathematical optimization; Distributed computing; Engineering; Mathematics; Renewable energy","score_opus":0.010237031135766165,"score_gpt":0.20365302260493903,"score_spread":0.19341599146917288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799921325","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013284035,0.00056138786,0.97556096,0.0005209383,0.000070666385,0.000036163045,0.00019667853,0.00010028912,0.009668881],"genre_scores_gemma":[0.9089904,0.001841211,0.07513448,0.00018491584,0.00018678608,0.00036444975,0.00033361887,0.000067964495,0.012896091],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960154,0.0001799025,0.000018814222,0.000081428065,0.000070561975,0.00004781767],"domain_scores_gemma":[0.99915576,0.00051885436,0.00014336694,0.0000455176,0.00009674585,0.00003969351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007011246,0.0009047799,0.0007201655,0.0005979696,0.0004034625,0.0012793159,0.00097458315,0.0011253678,0.002979678],"category_scores_gemma":[0.0019054916,0.00042005072,0.000883069,0.0005218442,0.000898048,0.0010413249,0.0010897223,0.0017888687,0.0003052069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010820936,0.00001760201,0.00057446247,0.000027101212,0.00003813513,0.000058136597,0.00005550433,0.91042095,0.00047125513,0.08462544,0.0004491009,0.00325137],"study_design_scores_gemma":[0.0000023602986,0.00000766794,0.00008922472,0.0000036321303,0.0000031842842,0.0000055598916,0.000011194931,0.9860072,0.000039235838,0.013262305,0.00056455523,0.000003871847],"about_ca_topic_score_codex":0.011426545,"about_ca_topic_score_gemma":0.006725257,"teacher_disagreement_score":0.011426545,"about_ca_system_score_codex":0.0012535255,"about_ca_system_score_gemma":0.0008941529,"threshold_uncertainty_score":0.022720039},"labels":[],"label_agreement":null},{"id":"W2800756770","doi":"10.1109/tia.2018.2828379","title":"A Bidding Strategy for Virtual Power Plants With the Intraday Demand Response Exchange Market Using the Stochastic Programming","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Office of Electricity Delivery and Energy Reliability; U.S. Department of Energy","keywords":"Bidding; Demand response; Virtual power plant; Stochastic programming; Computer science; Mathematical optimization; Microeconomics; Economics; Engineering; Mathematics; Electrical engineering; Renewable energy; Electricity","score_opus":0.025871576384925075,"score_gpt":0.25718227717739783,"score_spread":0.23131070079247276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800756770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02315206,0.00013856524,0.9700131,0.00027411804,0.000035411875,0.00009702127,0.000051724743,0.00009186753,0.0061462396],"genre_scores_gemma":[0.9348465,0.00019830259,0.059329372,0.00008961961,0.00003378609,0.00019674025,0.00007083196,0.00005379533,0.0051809195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882084,0.0006181132,0.000034771932,0.00015174551,0.00019646095,0.00017807362],"domain_scores_gemma":[0.999138,0.00043409652,0.00014329687,0.000037609865,0.00012553525,0.00012140821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018337676,0.0009863442,0.0014782266,0.0003586229,0.00062984833,0.0018213002,0.0019296345,0.0011155173,0.0036090447],"category_scores_gemma":[0.0022332591,0.0008051359,0.0011866383,0.0006293029,0.00083667727,0.0018310002,0.0011600063,0.0013953906,0.00033373534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006905377,0.000051517447,0.00022511769,0.00005249993,0.00003056024,0.00015781214,0.000049929993,0.94583386,0.0009879533,0.04558881,0.00084802863,0.006104898],"study_design_scores_gemma":[0.0000067926626,0.000017108965,0.000026735102,0.0000015503407,0.000003705366,0.000016539381,0.0000072259886,0.99630594,0.00007027624,0.003329164,0.00021076591,0.0000041064527],"about_ca_topic_score_codex":0.0042170696,"about_ca_topic_score_gemma":0.0038009265,"teacher_disagreement_score":0.0042170696,"about_ca_system_score_codex":0.0013690582,"about_ca_system_score_gemma":0.0019745163,"threshold_uncertainty_score":0.012073398},"labels":[],"label_agreement":null},{"id":"W2801294343","doi":"10.1109/sasg.2017.8356511","title":"Energy storage systems integration with household: A case study of average Ontario household using lead acid battery","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Residence; Lead–acid battery; Energy storage; Battery (electricity); Electricity; Environmental economics; Lead (geology); Energy (signal processing); Computer science; Environmental science; Engineering; Electrical engineering; Economics; Power (physics); Mathematics","score_opus":0.046215187649369376,"score_gpt":0.21630432587931148,"score_spread":0.1700891382299421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801294343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9916855,0.000059489856,0.00071064424,0.00016387684,0.000003359608,0.00007290948,0.0002094804,0.0000169804,0.0070777857],"genre_scores_gemma":[0.99378294,0.00013015501,0.0008848759,0.0000184235,0.0000027552524,0.000019479072,0.0001177465,0.0000058593637,0.005037886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995254,0.00011375206,0.000017846789,0.00004889677,0.00012685737,0.00016716612],"domain_scores_gemma":[0.9993043,0.00024402798,0.00007288203,0.000042788055,0.00020742803,0.00012853598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036333507,0.00051987317,0.0003606007,0.0005010809,0.002952446,0.0011055456,0.0011017402,0.0011652951,0.0039402065],"category_scores_gemma":[0.0010255079,0.0002564821,0.00048518126,0.0014564797,0.0010520553,0.000716933,0.00071220734,0.00043425758,0.00030897456],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019409931,0.0033997525,0.37691164,0.0008596381,0.00038925663,0.08417966,0.015472762,0.40091333,0.021693747,0.020684713,0.0119702695,0.061584227],"study_design_scores_gemma":[0.0005561537,0.0026022922,0.30629513,0.00016982123,0.0004644388,0.007328935,0.1204577,0.5034064,0.015557434,0.0040298956,0.038835444,0.0002963221],"about_ca_topic_score_codex":0.76250714,"about_ca_topic_score_gemma":0.8637007,"teacher_disagreement_score":0.23749286,"about_ca_system_score_codex":0.00977694,"about_ca_system_score_gemma":0.0038477676,"threshold_uncertainty_score":0.47778296},"labels":[],"label_agreement":null},{"id":"W2803349034","doi":"10.1145/3208903.3212029","title":"Flattening the Duck Curve Using Grid-friendly Solar Panel Orientation","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Grid; Flattening; Environmental science; Flexibility (engineering); Photovoltaic system; Thermal; Orientation (vector space); Automotive engineering; Computer science; Meteorology; Engineering; Electrical engineering; Mechanical engineering; Geology; Mathematics; Geodesy; Physics","score_opus":0.025725371388778933,"score_gpt":0.23328315388639492,"score_spread":0.207557782497616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803349034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8567956,0.00040984622,0.11046274,0.00027103044,0.00008198608,0.000065209664,0.00034737267,0.0012461308,0.030320091],"genre_scores_gemma":[0.9937605,0.000071740724,0.0051102345,0.00003648602,0.0000033148094,0.000006142858,0.00007408744,0.000042739302,0.0008947853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998443,0.000023629997,0.0000040688396,0.000029070936,0.00003791489,0.000060961953],"domain_scores_gemma":[0.99959415,0.00008760061,0.00006472861,0.00012220108,0.00008750492,0.00004387541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001742613,0.0004323736,0.00027824842,0.00022110458,0.00022617156,0.0005877306,0.00041472216,0.00028466174,0.0028612155],"category_scores_gemma":[0.00078745844,0.00014038518,0.00022461182,0.0004105684,0.00023361357,0.0005491328,0.00033248888,0.00047843726,0.00075949286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065430097,0.0005683367,0.04971856,0.0002960193,0.00008755217,0.0008826373,0.00034107306,0.51723874,0.18249933,0.009841051,0.0077796225,0.23009288],"study_design_scores_gemma":[0.00009129634,0.0011179724,0.07672403,0.000088152054,0.000099583754,0.0009586037,0.00086430914,0.7645671,0.11468699,0.008611182,0.032060698,0.00013018068],"about_ca_topic_score_codex":0.0031704756,"about_ca_topic_score_gemma":0.0064736702,"teacher_disagreement_score":0.0031704756,"about_ca_system_score_codex":0.0003214672,"about_ca_system_score_gemma":0.00025191973,"threshold_uncertainty_score":0.0095716715},"labels":[],"label_agreement":null},{"id":"W2807544181","doi":"10.1109/fmec.2018.8364080","title":"Artificial intelligence framework for smart city microgrids: State of the art, challenges, and opportunities","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":76,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Gnowit (Canada)","funders":"","keywords":"Scalability; Computer science; Microgrid; Inference; Smart grid; Smart city; Edge computing; Data science; Mainstream; Information and Communications Technology; Big data; Enhanced Data Rates for GSM Evolution; Internet of Things; Artificial intelligence; Computer security; Engineering; World Wide Web; Database","score_opus":0.0951375276026951,"score_gpt":0.2569306696294922,"score_spread":0.16179314202679707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807544181","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009009172,0.0046374355,0.9665759,0.0053394553,0.00014841287,0.000053515934,0.00023199066,0.0006581778,0.013345884],"genre_scores_gemma":[0.49674693,0.010611651,0.4802354,0.0011841517,0.00041311822,0.000266748,0.0008327639,0.00016474196,0.009544582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996338,0.00014404337,0.000018844494,0.00006431582,0.00010405613,0.000035015826],"domain_scores_gemma":[0.9995788,0.00021787398,0.000028813736,0.00004417518,0.00009199324,0.000038339967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010224452,0.0005513671,0.0006675562,0.00043881772,0.00041190267,0.002228802,0.0014622172,0.00091854134,0.0024271922],"category_scores_gemma":[0.0014453544,0.00024523336,0.0006503828,0.0008256599,0.0010344145,0.0023265856,0.0012666362,0.0022646505,0.0004960546],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037747872,0.000079330224,0.0007588402,0.00022260129,0.00007600603,0.00011716434,0.00011088962,0.6022891,0.00076895725,0.30428228,0.006681017,0.084576085],"study_design_scores_gemma":[0.000004586021,0.000011531126,0.000090476264,0.000026649768,0.0000069913003,0.00001678518,0.000027047145,0.9015502,0.00015049175,0.08993817,0.0081714885,0.0000055586306],"about_ca_topic_score_codex":0.009558835,"about_ca_topic_score_gemma":0.009222427,"teacher_disagreement_score":0.009558835,"about_ca_system_score_codex":0.001243095,"about_ca_system_score_gemma":0.0012464877,"threshold_uncertainty_score":0.019006371},"labels":[],"label_agreement":null},{"id":"W2808604553","doi":"10.1016/j.apenergy.2018.06.040","title":"Optimal scheduling of a microgrid in a volatile electricity market environment: Portfolio optimization approach","year":2018,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Microgrid; Electricity; Electricity market; Computer science; Renewable energy; Photovoltaic system; Scheduling (production processes); Grid; Demand response; Mathematical optimization; Engineering; Electrical engineering","score_opus":0.004577644194704534,"score_gpt":0.16410749931477175,"score_spread":0.15952985512006723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808604553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12011098,0.00074496836,0.8665699,0.000985418,0.00012611401,0.00013294049,0.00022870186,0.00020152135,0.01089943],"genre_scores_gemma":[0.9520479,0.00033216705,0.043731965,0.00008961898,0.00007422656,0.00009756478,0.000120760546,0.000055867524,0.003449945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955744,0.00022273624,0.000015544252,0.00006184666,0.00006719624,0.000075291035],"domain_scores_gemma":[0.9992385,0.0004648166,0.00010497314,0.000027808988,0.00008133393,0.00008265227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001285696,0.0010148726,0.0016037952,0.00078326,0.00047448074,0.001535532,0.0010129508,0.0015087439,0.0022900128],"category_scores_gemma":[0.0032837852,0.0008230311,0.00061093754,0.00093970343,0.0006641621,0.001214903,0.0010065242,0.0010195276,0.00020815642],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024411633,0.000013866933,0.00011636181,0.000011788314,0.000018538512,0.000019717214,0.000007377804,0.995249,0.000121749275,0.0019088141,0.00019071971,0.0023175918],"study_design_scores_gemma":[0.0000044386998,0.000008860816,0.00003603793,0.0000013047065,0.000003942834,0.0000031289599,0.000004258852,0.99860626,0.000024914087,0.0012611728,0.000044303113,0.0000014297796],"about_ca_topic_score_codex":0.006103738,"about_ca_topic_score_gemma":0.0051360135,"teacher_disagreement_score":0.006103738,"about_ca_system_score_codex":0.0009588109,"about_ca_system_score_gemma":0.0013434849,"threshold_uncertainty_score":0.0121364},"labels":[],"label_agreement":null},{"id":"W2808736933","doi":"10.1109/tsg.2018.2848727","title":"Real-Time Emulation of Residential Buildings by Hardware Solution of Multi-Layer Model","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Emulation; Modular design; Computer science; Grid; Layer (electronics); Energy consumption; Embedded system; Real-time computing; Simulation; Engineering; Operating system","score_opus":0.018346178812134652,"score_gpt":0.23792520231086445,"score_spread":0.2195790234987298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808736933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.113271266,0.000060579972,0.87958026,0.000048870963,0.00003345126,0.000050463474,0.0001071813,0.0032963846,0.0035515416],"genre_scores_gemma":[0.9269799,0.00005996629,0.07105069,0.000014266597,0.0000063218777,0.000047226844,0.00015618434,0.00011382748,0.0015716818],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998733,0.00003763991,0.000007048857,0.00001947583,0.000044079476,0.000018496039],"domain_scores_gemma":[0.99985623,0.000040603896,0.000016412407,0.00004903364,0.000029474284,0.00000818821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020737849,0.00046397457,0.0003100664,0.00019448128,0.00014861228,0.00037590828,0.00055099383,0.00023882888,0.0021114452],"category_scores_gemma":[0.0004054327,0.00015062498,0.0003532597,0.00015080017,0.00015580843,0.00045520894,0.00039494198,0.00036439163,0.00034978488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014870775,0.000055349385,0.0016298939,0.00008403568,0.00003104674,0.00009508913,0.00010270297,0.9255288,0.028505348,0.0034158928,0.00069746,0.039705634],"study_design_scores_gemma":[0.000007835964,0.000030542862,0.0002788947,0.0000029361227,0.000006040244,0.000018298306,0.000007756537,0.98946905,0.008824248,0.00032703785,0.0010232845,0.0000039969327],"about_ca_topic_score_codex":0.0020428784,"about_ca_topic_score_gemma":0.0018743718,"teacher_disagreement_score":0.0021114452,"about_ca_system_score_codex":0.00027566176,"about_ca_system_score_gemma":0.00030518768,"threshold_uncertainty_score":0.0070634484},"labels":[],"label_agreement":null},{"id":"W2811094277","doi":"10.1002/9781119422099.ch6","title":"Integrated Planning and Operational Control Of Resilient MEG For Optimal DERs Sizing and Enhanced Dynamic Performance","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Sizing; Renewable energy; Computer science; Reliability engineering; Distributed generation; Controller (irrigation); Engineering; Automotive engineering; Control engineering; Electrical engineering","score_opus":0.0065495357267197525,"score_gpt":0.2196357824340182,"score_spread":0.21308624670729845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811094277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041563824,0.0003269907,0.9389498,0.0001764531,0.000068695015,0.00016923965,0.00014819104,0.0013359179,0.01726078],"genre_scores_gemma":[0.9494041,0.00017688247,0.047384217,0.000055836746,0.000024584986,0.00014048365,0.00007034589,0.000055181597,0.0026883695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983394,0.000029842162,0.000009462945,0.000041751995,0.000057893867,0.000027050004],"domain_scores_gemma":[0.9998847,0.00003446767,0.00002411347,0.000012535711,0.000036898375,0.0000072153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002570819,0.0007797119,0.0003413232,0.00024584297,0.00024652883,0.0008689533,0.0005544421,0.0002676795,0.0026620317],"category_scores_gemma":[0.00030809798,0.00020997276,0.0002439968,0.00017833097,0.00026936588,0.0004613582,0.0004439684,0.00046711694,0.00031180796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020418181,0.000053645534,0.0007602752,0.00016175295,0.000032679873,0.00015826066,0.000103165796,0.8589153,0.027046788,0.012948822,0.0021749877,0.0974401],"study_design_scores_gemma":[0.000014863101,0.00009904392,0.00035775523,0.000011399174,0.000013962964,0.00003063235,0.000024206733,0.9861595,0.007435308,0.0023960038,0.00344841,0.000008958182],"about_ca_topic_score_codex":0.0016534587,"about_ca_topic_score_gemma":0.0026904908,"teacher_disagreement_score":0.0026620317,"about_ca_system_score_codex":0.00042776638,"about_ca_system_score_gemma":0.000522978,"threshold_uncertainty_score":0.008905411},"labels":[],"label_agreement":null},{"id":"W2833907136","doi":"10.1007/978-3-319-94965-9_3","title":"Heuristics-Based Detection of Abnormal Energy Consumption","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mount Royal University","funders":"","keywords":"Heuristics; Abnormality; Consumption (sociology); Energy consumption; Computer science; Electricity; Energy (signal processing); Mains electricity; Engineering; Psychology; Statistics; Mathematics; Social psychology; Voltage; Electrical engineering","score_opus":0.017779238088322595,"score_gpt":0.21232263513031585,"score_spread":0.19454339704199325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2833907136","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56124663,0.0023933845,0.40998143,0.0004578872,0.00028870362,0.00031363044,0.0019670245,0.007292564,0.01605874],"genre_scores_gemma":[0.93749386,0.00017563296,0.059515145,0.000071886985,0.000039594877,0.00003777864,0.000869185,0.00007916261,0.0017177954],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992829,0.0001500712,0.000050442308,0.00015138848,0.00023807032,0.00012709475],"domain_scores_gemma":[0.99792045,0.0012234747,0.00024609908,0.0001456395,0.0003696126,0.00009467149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007290783,0.00064450665,0.0008647911,0.0022699113,0.0002469923,0.0012265735,0.0008921024,0.00053662586,0.0011397365],"category_scores_gemma":[0.0032264797,0.0002518508,0.00034274012,0.0011789028,0.00027632012,0.0004991376,0.00040335848,0.00042901764,0.0004924038],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022917078,0.00088312005,0.053325024,0.00038770016,0.00031971754,0.00060782407,0.00020716838,0.32141492,0.037965607,0.0070270784,0.014178017,0.5613922],"study_design_scores_gemma":[0.000033702247,0.00012715432,0.00867424,0.000018048373,0.000042809796,0.00016510685,0.000053775457,0.9794861,0.008304727,0.0019299824,0.0011445914,0.000019803327],"about_ca_topic_score_codex":0.006348495,"about_ca_topic_score_gemma":0.0073741106,"teacher_disagreement_score":0.006348495,"about_ca_system_score_codex":0.0006191384,"about_ca_system_score_gemma":0.00086861313,"threshold_uncertainty_score":0.012623072},"labels":[],"label_agreement":null},{"id":"W2874851820","doi":"10.1109/iccw.2018.8403791","title":"Implementation of a Smart Grid Communication System Compliant with IEEE 2030.5","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Transformer; Energy consumption; Computer science; Grid; Embedded system; Reliability engineering; Electrical engineering; Engineering; Voltage","score_opus":0.013070044827689694,"score_gpt":0.23348718855849493,"score_spread":0.22041714373080523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2874851820","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22289604,0.00021518425,0.6945032,0.00063308084,0.00042412293,0.0013545956,0.00043967093,0.040142246,0.039391924],"genre_scores_gemma":[0.91015893,0.00006213992,0.078037314,0.00026763507,0.00003534277,0.00036622756,0.00046383822,0.00014385094,0.010464635],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994012,0.00013677543,0.000053626067,0.000104765495,0.00020066509,0.000102963364],"domain_scores_gemma":[0.9994802,0.000045820405,0.000065252425,0.00013190859,0.00022965348,0.00004716169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006190599,0.0003715875,0.0003739036,0.0003811291,0.0003729803,0.000875205,0.00096133107,0.00060617476,0.0038070793],"category_scores_gemma":[0.0006533515,0.00014649468,0.0002126719,0.00021664028,0.00022903759,0.0007864603,0.0004492214,0.0004913688,0.0015784573],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019476758,0.001443959,0.022883657,0.0006406567,0.0002737363,0.0021493463,0.0014822041,0.053355638,0.24012792,0.028128373,0.04893365,0.59863317],"study_design_scores_gemma":[0.0005286978,0.0022906677,0.013353559,0.0000843622,0.0001758006,0.0013534669,0.0002889244,0.6112895,0.24980831,0.0035941883,0.11708509,0.00014745421],"about_ca_topic_score_codex":0.0020211826,"about_ca_topic_score_gemma":0.0013567682,"teacher_disagreement_score":0.0038070793,"about_ca_system_score_codex":0.00037398384,"about_ca_system_score_gemma":0.00071690814,"threshold_uncertainty_score":0.012735903},"labels":[],"label_agreement":null},{"id":"W2883316859","doi":"10.1016/j.energy.2018.07.132","title":"Optimal collaborative demand-response planner for smart residential buildings","year":2018,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Planner; Demand response; Plan (archaeology); Computer science; Sensitivity (control systems); Work (physics); Outcome (game theory); Scheme (mathematics); Energy consumption; Operations research; Consumption (sociology); Duration (music); Environmental economics; Engineering; Electricity; Microeconomics; Economics","score_opus":0.00608061308011457,"score_gpt":0.2178382976037256,"score_spread":0.21175768452361104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883316859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13621743,0.00031692968,0.84529024,0.0008467209,0.00012237708,0.00026455565,0.00042905821,0.0006217666,0.01589092],"genre_scores_gemma":[0.97044015,0.00005238347,0.025723644,0.00005263004,0.000019696796,0.000093576906,0.00012760086,0.000048947793,0.003441429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924856,0.00022681436,0.000027425713,0.00018283242,0.00010701248,0.00020745149],"domain_scores_gemma":[0.9988715,0.0006474013,0.00011330207,0.00006203244,0.00016864757,0.00013710232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012637652,0.0011972522,0.0024887684,0.00063746277,0.0007858681,0.0016575049,0.0017466499,0.0023086767,0.0074064345],"category_scores_gemma":[0.0028793034,0.0012099227,0.000670905,0.00083419593,0.00079596497,0.0015951534,0.0016655505,0.0013269306,0.00056694215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001218227,0.000048254304,0.0001493594,0.000025160065,0.000012907666,0.00003676954,0.00002951564,0.9929463,0.0003352996,0.0016976829,0.0005378287,0.004059055],"study_design_scores_gemma":[0.000012095227,0.00001749869,0.00003969459,0.0000012733403,0.0000035609517,0.0000034720094,0.000016355354,0.9987086,0.00008520714,0.0010110158,0.00009854657,0.000002643525],"about_ca_topic_score_codex":0.012259854,"about_ca_topic_score_gemma":0.014499368,"teacher_disagreement_score":0.012259854,"about_ca_system_score_codex":0.0015043726,"about_ca_system_score_gemma":0.0018499371,"threshold_uncertainty_score":0.024776995},"labels":[],"label_agreement":null},{"id":"W2883353101","doi":"10.1109/jsyst.2018.2850882","title":"Power Congestion Management in Integrated Electricity and Gas Distribution Grids","year":2018,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Profit (economics); Scheduling (production processes); Portfolio; Power system simulation; Electric power system; Mathematical optimization; Power (physics); Business; Economics; Microeconomics","score_opus":0.006330227368475889,"score_gpt":0.20184460997266188,"score_spread":0.195514382604186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883353101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30507615,0.0006626395,0.6869088,0.00033053788,0.0000844933,0.00014452377,0.00007016996,0.00088120776,0.005841447],"genre_scores_gemma":[0.98538744,0.00007965303,0.013561809,0.000018069983,0.000011622236,0.000019125935,0.000023735152,0.00001543136,0.00088308443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969625,0.00008931569,0.000011257407,0.000068026566,0.000057166617,0.000078041136],"domain_scores_gemma":[0.99969804,0.00012322437,0.000055872122,0.00001731637,0.000067969624,0.000037576938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075861544,0.00059354777,0.000657889,0.00047124448,0.00045457235,0.000997273,0.0007632559,0.0004221013,0.0009922888],"category_scores_gemma":[0.0013585272,0.00038352716,0.00026043787,0.00057802565,0.0005613605,0.0008975951,0.0006964928,0.0005551597,0.00008627953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110785964,0.000046752433,0.00087011285,0.000020801283,0.000025670557,0.00005283234,0.00002587737,0.9703966,0.001045324,0.0026586782,0.000338514,0.024407998],"study_design_scores_gemma":[0.000014020926,0.000029082415,0.00024990915,0.0000019981694,0.0000084957965,0.000009220139,0.000012405467,0.9975764,0.0003319981,0.0015902686,0.00017299314,0.000003135732],"about_ca_topic_score_codex":0.016392311,"about_ca_topic_score_gemma":0.015376331,"teacher_disagreement_score":0.016392311,"about_ca_system_score_codex":0.001262244,"about_ca_system_score_gemma":0.0011467886,"threshold_uncertainty_score":0.032593787},"labels":[],"label_agreement":null},{"id":"W2883995124","doi":"10.17775/cseejpes.2018.00500","title":"A demand response system for wind power integration: greenhouse gas mitigation and reduction of generator cycling","year":2018,"lang":"en","type":"article","venue":"CSEE Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Cycling; Greenhouse gas; Reduction (mathematics); Environmental science; Generator (circuit theory); Automotive engineering; Wind power; Power (physics); Electrical engineering; Engineering; Geology; Mathematics; Physics","score_opus":0.0073681934478022305,"score_gpt":0.20521633223563593,"score_spread":0.1978481387878337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883995124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8775909,0.00019056739,0.10479865,0.00068420824,0.00008347127,0.00023943822,0.00034443248,0.00060621713,0.015462119],"genre_scores_gemma":[0.99480516,0.000035103116,0.003996349,0.000026426156,0.00000386256,0.00003125836,0.00005357468,0.000011014254,0.001037138],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998274,0.000078494246,0.000007280452,0.0000277344,0.000027458642,0.000031643245],"domain_scores_gemma":[0.9996625,0.00018045494,0.000046623765,0.000017821152,0.000045538603,0.000047076188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004780238,0.00059181213,0.00057668897,0.0002471313,0.00036368577,0.0007164641,0.0006572827,0.000853745,0.00323374],"category_scores_gemma":[0.0006797292,0.00027154604,0.00036688114,0.00025237072,0.0002904426,0.0007400249,0.0007237849,0.00063722406,0.00025636575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003493439,0.0002367978,0.001668317,0.000067843255,0.000035864017,0.0002824447,0.00004500501,0.983557,0.0035097487,0.002146818,0.00058999815,0.0075109173],"study_design_scores_gemma":[0.00005889615,0.00014854678,0.00042807386,0.000002468491,0.000010790524,0.000019467712,0.000027466733,0.99778986,0.0005062294,0.0006260074,0.00037603723,0.000006218167],"about_ca_topic_score_codex":0.005154679,"about_ca_topic_score_gemma":0.0059423284,"teacher_disagreement_score":0.005154679,"about_ca_system_score_codex":0.0006209941,"about_ca_system_score_gemma":0.0005106932,"threshold_uncertainty_score":0.010817885},"labels":[],"label_agreement":null},{"id":"W2886579254","doi":"10.23919/acc.2018.8431905","title":"Optimal Dynamic Pricing for Binary Demands in Smart Grids: A Fair and Privacy-Preserving Strategy","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Smart grid; Population; Binary number; Markov process; Markov chain; Operator (biology); Operations research; Distributed computing; Mathematics; Engineering","score_opus":0.01057480352835553,"score_gpt":0.2332388773411692,"score_spread":0.22266407381281367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886579254","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05918289,0.00016421037,0.9332749,0.0006813033,0.000047473473,0.000098377735,0.00009815245,0.00014065082,0.006312105],"genre_scores_gemma":[0.961516,0.0001268983,0.035677172,0.00012610448,0.000030084586,0.000078434656,0.000051660278,0.000026410838,0.0023673337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986965,0.0005967359,0.000043856955,0.00018229349,0.00023807431,0.00024262085],"domain_scores_gemma":[0.997593,0.0016519277,0.0002210337,0.0001787038,0.00019027421,0.00016501918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022008962,0.0008309916,0.0013279616,0.0004173965,0.0006800279,0.0018744629,0.0013810687,0.0014935149,0.0022807722],"category_scores_gemma":[0.0051779393,0.00041745105,0.00075157237,0.0006713706,0.0016263013,0.0020065056,0.0015842393,0.0013160075,0.00026847108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018582698,0.000074367126,0.0005282774,0.000053143176,0.000034154782,0.0001767258,0.00012655102,0.8866178,0.001861182,0.096537784,0.0014362301,0.012367991],"study_design_scores_gemma":[0.000014319526,0.000019186913,0.00004037716,0.000003479323,0.000004066069,0.000017773687,0.00001567637,0.9767264,0.00020431525,0.022739045,0.0002095084,0.000005815278],"about_ca_topic_score_codex":0.0033881408,"about_ca_topic_score_gemma":0.002213238,"teacher_disagreement_score":0.0033881408,"about_ca_system_score_codex":0.0016856341,"about_ca_system_score_gemma":0.0018261906,"threshold_uncertainty_score":0.012230217},"labels":[],"label_agreement":null},{"id":"W2887967389","doi":"10.1049/iet-gtd.2018.5943","title":"Two‐stage stochastic demand response in smart grid considering random appliance usage patterns","year":2018,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Smart grid; Stage (stratigraphy); Computer science; Demand response; Grid; Mathematical optimization; Mathematics; Geology; Engineering; Electrical engineering; Electricity","score_opus":0.016842456973365772,"score_gpt":0.24025930937308465,"score_spread":0.22341685239971887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887967389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1990771,0.00022865624,0.7940579,0.00044563235,0.000058475478,0.00015359967,0.00028028965,0.00039445682,0.005303878],"genre_scores_gemma":[0.9821294,0.00007976191,0.015534259,0.00003814978,0.000012322013,0.00008378977,0.000098812125,0.000024884603,0.0019986636],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891376,0.00048811542,0.00003841134,0.00017419517,0.0001821371,0.00020331636],"domain_scores_gemma":[0.99900025,0.0006101124,0.00015060978,0.000039268005,0.00014191898,0.00005776136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001305833,0.0007919209,0.0013089335,0.0002658919,0.00036126238,0.000959901,0.0009882951,0.0009306317,0.0016076977],"category_scores_gemma":[0.0017335601,0.0009134162,0.00086922955,0.00064168515,0.0005578947,0.00075485546,0.0006571471,0.0008080586,0.00016167694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003396038,0.000009085491,0.00012331577,0.000011338219,0.000006805426,0.00003406694,0.0000067099118,0.99752516,0.0002611302,0.0009409395,0.000065997105,0.0009815209],"study_design_scores_gemma":[0.000004294261,0.000010781274,0.000048281374,4.715057e-7,0.00000179091,0.0000024197782,0.0000028756465,0.99955624,0.00006714229,0.00027789816,0.000025999416,0.0000017343682],"about_ca_topic_score_codex":0.012400614,"about_ca_topic_score_gemma":0.00838605,"teacher_disagreement_score":0.012400614,"about_ca_system_score_codex":0.0010895255,"about_ca_system_score_gemma":0.0010945497,"threshold_uncertainty_score":0.024656892},"labels":[],"label_agreement":null},{"id":"W2888818189","doi":"10.1109/tpwrs.2018.2867476","title":"A Decentralized Framework for the Optimal Coordination of Distributed Energy Resources","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robustness (evolution); Computer science; Distributed generation; Column generation; Mathematical optimization; Distributed computing; Computation; Linear programming; Decomposition; Integer programming; Engineering; Mathematics; Algorithm; Renewable energy","score_opus":0.010338845015574994,"score_gpt":0.22288540935908352,"score_spread":0.21254656434350852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888818189","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00201649,0.000071054375,0.9957991,0.00010117042,0.000021463182,0.000030259655,0.00003168053,0.00008600434,0.0018427633],"genre_scores_gemma":[0.45573878,0.000309877,0.5397159,0.000104611565,0.00010176093,0.00035141065,0.0001668385,0.00008711481,0.003423715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992599,0.0002700882,0.000032637177,0.00014937908,0.00021106185,0.00007688686],"domain_scores_gemma":[0.99946505,0.00026061077,0.00006437037,0.000085219646,0.00008860461,0.000036187725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012187231,0.00064151787,0.0008560871,0.00046887927,0.0005760224,0.0011984793,0.0011417163,0.0007567097,0.0021977026],"category_scores_gemma":[0.0020351666,0.0004021326,0.000523743,0.0007440768,0.00089635106,0.0009509904,0.0012280172,0.0013605406,0.00031928334],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023983937,0.000030056126,0.000121195764,0.00004782447,0.00001845752,0.000056998662,0.000036732796,0.89280176,0.0015525726,0.082036115,0.0016017182,0.021672608],"study_design_scores_gemma":[0.0000133928115,0.00001709846,0.00003117577,0.000004213254,0.0000035364237,0.000016593398,0.000009410303,0.97799313,0.00029101595,0.019839864,0.0017766306,0.0000039890024],"about_ca_topic_score_codex":0.0024384186,"about_ca_topic_score_gemma":0.004235099,"teacher_disagreement_score":0.0024384186,"about_ca_system_score_codex":0.0009174769,"about_ca_system_score_gemma":0.0021080591,"threshold_uncertainty_score":0.007352054},"labels":[],"label_agreement":null},{"id":"W2889019546","doi":"10.1016/j.scs.2018.08.029","title":"Optimisation of community shared solar application in energy efficient communities","year":2018,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaic system; Environmental economics; Renewable energy; Greenhouse gas; Environmental science; Grid; Leverage (statistics); Electricity; Unit (ring theory); Solar energy; Business; Computer science; Engineering; Economics; Geography; Electrical engineering","score_opus":0.0077605173410072335,"score_gpt":0.19817215877528943,"score_spread":0.1904116414342822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889019546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7982075,0.00046703246,0.17171422,0.00030155736,0.000099867604,0.0002280644,0.00011581706,0.00049898046,0.028366858],"genre_scores_gemma":[0.9955058,0.000019325793,0.0030184404,0.000008638456,0.0000030169454,0.000017491531,0.00001556897,0.000017749184,0.0013939209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951255,0.00012060089,0.000011792706,0.000066804736,0.00015866995,0.00012949054],"domain_scores_gemma":[0.9992467,0.0003473223,0.000044998138,0.00007880784,0.0002032988,0.000078811594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058474747,0.00047734487,0.0008592809,0.0003962198,0.0006106578,0.0010392392,0.001204439,0.00091277546,0.0066085276],"category_scores_gemma":[0.0016571775,0.00027980146,0.00042820844,0.00062884006,0.000382583,0.0007891418,0.0014680254,0.0005193499,0.00041676773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005419503,0.0005905136,0.0011858164,0.00012670862,0.00004611003,0.000121603145,0.00007341443,0.92278373,0.01836779,0.0025564875,0.0011405022,0.052465398],"study_design_scores_gemma":[0.000036542373,0.00026062352,0.00065283664,0.0000058066316,0.000014742532,0.000031611937,0.000090087626,0.992254,0.0046384945,0.0014125687,0.0005951375,0.000007418392],"about_ca_topic_score_codex":0.003729234,"about_ca_topic_score_gemma":0.006357778,"teacher_disagreement_score":0.0066085276,"about_ca_system_score_codex":0.0007535833,"about_ca_system_score_gemma":0.00079303543,"threshold_uncertainty_score":0.02210766},"labels":[],"label_agreement":null},{"id":"W2889254900","doi":"10.1109/ccece.2018.8447624","title":"New Heat Energy Trading Concepts for the Next Generation Smart Grids","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Smart grid; Computer science; Electricity; Electric heating; Electricity generation; Electric power; Grid; Energy (signal processing); Distributed generation; Production (economics); Electric potential energy; Distributed computing; Electrical engineering; Renewable energy; Power (physics); Engineering","score_opus":0.048175508735742126,"score_gpt":0.24660898671587203,"score_spread":0.1984334779801299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889254900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013451103,0.007823186,0.798998,0.008889009,0.001837914,0.00012746987,0.00010787433,0.0002971546,0.16846822],"genre_scores_gemma":[0.5995954,0.009120787,0.32711783,0.0023576482,0.0024213414,0.000510863,0.00012473325,0.00021311686,0.058538243],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99918646,0.00021816243,0.000043694865,0.00017447287,0.0003044852,0.00007279384],"domain_scores_gemma":[0.9995158,0.00016304426,0.000055314955,0.000119877484,0.00008526609,0.000060685692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014161243,0.00051787583,0.00053854176,0.000558748,0.001155335,0.0029820716,0.0015281346,0.0018019986,0.0059810355],"category_scores_gemma":[0.001721241,0.00031975823,0.0007357663,0.0007815872,0.0038417717,0.010670437,0.0026071551,0.0029783952,0.00090069766],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046277423,0.0000062079953,0.000018795894,0.000012485018,0.0000019980353,0.000016812593,0.000045942674,0.00091660296,0.00021410744,0.9937551,0.0005803358,0.004426942],"study_design_scores_gemma":[0.000010894594,0.000017121925,0.0000436029,0.000029481149,0.0000050160916,0.0000837625,0.00006303146,0.013006677,0.00044026223,0.941058,0.045230694,0.000011347648],"about_ca_topic_score_codex":0.00065377756,"about_ca_topic_score_gemma":0.00057750574,"teacher_disagreement_score":0.0059810355,"about_ca_system_score_codex":0.0014603434,"about_ca_system_score_gemma":0.0008298256,"threshold_uncertainty_score":0.020008504},"labels":[],"label_agreement":null},{"id":"W2889289957","doi":"10.1109/ccece.2018.8447742","title":"Real-World Implementation of Residential Thermostat Control for DR","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Thermostat; Setpoint; Demand response; Peak demand; Smart grid; Electricity; Peaking power plant; Flexibility (engineering); Load shifting; Thermal comfort; Demand reduction; Electricity demand; Load management; Computer science; Energy consumption; Control (management); Automotive engineering; Environmental economics; Engineering; Electrical engineering; Electricity generation; Distributed generation; Power (physics); Renewable energy; Economics; Meteorology","score_opus":0.011531292967289197,"score_gpt":0.27856839630549346,"score_spread":0.26703710333820424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889289957","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9871322,0.000031034422,0.007780116,0.00007112378,0.000020424075,0.000078132965,0.00019397921,0.00047221966,0.004220655],"genre_scores_gemma":[0.9980268,0.0000069034922,0.0015881357,0.000008449999,0.0000013994538,0.000011712948,0.000055890643,0.000006153605,0.0002946305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995977,0.00015797831,0.000016362705,0.00007475795,0.00009468793,0.00005846793],"domain_scores_gemma":[0.9993229,0.00024018434,0.000058195936,0.00013118873,0.00020029777,0.000047299207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005150847,0.0002970075,0.00020643763,0.00017331561,0.00023968778,0.000345294,0.00044435475,0.0002995838,0.0016874663],"category_scores_gemma":[0.001407538,0.000117638316,0.00015391363,0.00023927588,0.0003041542,0.00030624075,0.00020830195,0.0003010902,0.0003507426],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005087657,0.003994056,0.09263405,0.00061202346,0.00023465006,0.0020896397,0.0014374235,0.48671612,0.14697936,0.0029652985,0.008698101,0.24855162],"study_design_scores_gemma":[0.00048105,0.005132118,0.11190332,0.000025323714,0.0001016122,0.0004826775,0.0014571532,0.7855197,0.08454931,0.0009812193,0.009277842,0.000088685905],"about_ca_topic_score_codex":0.0040453314,"about_ca_topic_score_gemma":0.00504449,"teacher_disagreement_score":0.0040453314,"about_ca_system_score_codex":0.00042020855,"about_ca_system_score_gemma":0.00022337207,"threshold_uncertainty_score":0.008043587},"labels":[],"label_agreement":null},{"id":"W2889311066","doi":"10.1109/ccece.2018.8447645","title":"Simscape Power Systems Benchmarks for Education and Research in Power Grid Dynamics and Control","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Phasor; MATLAB; Correctness; Electric power system; Computer science; Power (physics); Grid; Control engineering; Engineering; Operating system","score_opus":0.009219194883403586,"score_gpt":0.2669832487290078,"score_spread":0.2577640538456042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889311066","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024916578,0.0009259061,0.7264674,0.0008262177,0.00049592875,0.00059159653,0.03259507,0.07987472,0.13330665],"genre_scores_gemma":[0.30640543,0.0012553661,0.5358679,0.00051240186,0.00013808718,0.0021056354,0.09771297,0.022567872,0.033434402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890256,0.0003351673,0.00009858112,0.00009744572,0.00050048303,0.00006574682],"domain_scores_gemma":[0.99700433,0.000974419,0.00017459878,0.00066695816,0.0010767552,0.00010294208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013432762,0.0012385956,0.00056345726,0.0013722975,0.00042608214,0.00095376885,0.0022224148,0.00059132976,0.0309343],"category_scores_gemma":[0.0066012344,0.00040805657,0.00050657464,0.002222874,0.00027605417,0.0013320321,0.0011324654,0.0012833873,0.009538505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007238097,0.000372247,0.0034954,0.0017907356,0.00013677815,0.00043001617,0.00024559107,0.35323665,0.009617938,0.053477686,0.3247949,0.25167826],"study_design_scores_gemma":[0.00031416534,0.00035074307,0.002506483,0.00025396238,0.000054362346,0.00053150515,0.00010512709,0.5649541,0.03283817,0.02668972,0.37132022,0.00008140537],"about_ca_topic_score_codex":0.003974612,"about_ca_topic_score_gemma":0.004142097,"teacher_disagreement_score":0.0309343,"about_ca_system_score_codex":0.00056770194,"about_ca_system_score_gemma":0.0011151348,"threshold_uncertainty_score":0.103485584},"labels":[],"label_agreement":null},{"id":"W2889336506","doi":"10.1109/ccece.2018.8447603","title":"Mitigating the Impact of Plug-In Electric Vehicles on Distribution Systems Using Demand-Side Management of Electric Water Heaters","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Setpoint; Thermostat; Automotive engineering; Plug-in; Peak demand; Demand side; Environmental science; Computer science; Engineering; Simulation; Environmental economics; Electrical engineering; Electricity","score_opus":0.009934385896661953,"score_gpt":0.22610218121875597,"score_spread":0.21616779532209401,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889336506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61495507,0.00067112676,0.37123883,0.0003608584,0.000093664414,0.00010487527,0.000075800046,0.0014424539,0.011057362],"genre_scores_gemma":[0.9968334,0.00009217353,0.0023299786,0.000012363217,0.000008733763,0.000005097129,0.000010510513,0.000008167738,0.00069972995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986315,0.000035273515,0.0000062774443,0.00001978899,0.000044635046,0.000030892654],"domain_scores_gemma":[0.9998099,0.00006804625,0.000042298492,0.000017356499,0.000052633186,0.000009683933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015078076,0.00057804596,0.0002650652,0.00017106693,0.0002634977,0.0004700188,0.0004523135,0.00020901,0.0010876361],"category_scores_gemma":[0.00036727623,0.00014625002,0.00012669234,0.0001463012,0.00018826913,0.0005150474,0.00041521856,0.00031862257,0.00012932107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042271242,0.00028019006,0.008805107,0.0005110449,0.00014321753,0.00062587304,0.0002961489,0.6129082,0.18215916,0.0060244873,0.001690802,0.18613307],"study_design_scores_gemma":[0.000039563358,0.00054942403,0.006650581,0.000030924843,0.00010451727,0.00018762634,0.00027501647,0.9028137,0.08039518,0.0025557587,0.0063727805,0.000024904703],"about_ca_topic_score_codex":0.0024546096,"about_ca_topic_score_gemma":0.004110909,"teacher_disagreement_score":0.0024546096,"about_ca_system_score_codex":0.00030673895,"about_ca_system_score_gemma":0.00029929916,"threshold_uncertainty_score":0.0048807263},"labels":[],"label_agreement":null},{"id":"W2889402862","doi":"10.1109/ccece.2018.8447822","title":"Power Appliance Disaggregation Framework Via Hybrid Hidden Markov Model","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Hidden Markov model; Computer science; Energy consumption; Identification (biology); Consumption (sociology); Pareto principle; Power consumption; Markov chain; Internet of Things; Markov model; Machine learning; Power (physics); Distributed computing; Artificial intelligence; Computer security; Engineering","score_opus":0.006140883603115225,"score_gpt":0.2058305685494297,"score_spread":0.19968968494631445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889402862","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012442119,0.00033246464,0.9841951,0.000169507,0.000040286945,0.000026303767,0.00018327167,0.0007468992,0.001864033],"genre_scores_gemma":[0.8828903,0.00040029845,0.1103306,0.000114859155,0.00009615485,0.00013349956,0.000734503,0.00010129965,0.00519841],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995902,0.000117841715,0.000023995743,0.00011444716,0.000094646675,0.000058903242],"domain_scores_gemma":[0.9996107,0.00023444554,0.000042687116,0.00003273971,0.00006022662,0.000019234316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007419455,0.00052617554,0.0009217106,0.00050894107,0.0003976308,0.0009039557,0.0013465489,0.00067543716,0.0026315562],"category_scores_gemma":[0.0011911581,0.00045891135,0.0008938079,0.000786415,0.00033192386,0.00094346097,0.0007724524,0.000814721,0.0004886397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041143274,0.00003363699,0.0009513009,0.00003243289,0.000049108537,0.00007072,0.00005469255,0.9605565,0.0006196134,0.010796705,0.0007747073,0.026019434],"study_design_scores_gemma":[0.0000010292282,0.0000023630512,0.000045757402,7.773188e-7,0.0000026519212,0.0000029335984,0.0000018854031,0.99785656,0.000037847203,0.001920397,0.00012640494,0.0000014046072],"about_ca_topic_score_codex":0.019241214,"about_ca_topic_score_gemma":0.017511632,"teacher_disagreement_score":0.019241214,"about_ca_system_score_codex":0.0007651505,"about_ca_system_score_gemma":0.0008756254,"threshold_uncertainty_score":0.038258433},"labels":[],"label_agreement":null},{"id":"W2889843557","doi":"10.1109/comapp.2018.8460222","title":"Integrating Small Scale Green Energy into Smart Grids: Prediction for Peak Load Reduction","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Smart grid; Photovoltaic system; Schedule; Grid; Autoregressive integrated moving average; Computer science; Energy consumption; Autoregressive model; Simulation; Reduction (mathematics); Automotive engineering; Real-time computing; Environmental science; Time series; Electrical engineering; Engineering; Mathematics; Statistics","score_opus":0.009010368531865693,"score_gpt":0.19524249894897158,"score_spread":0.1862321304171059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889843557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7735695,0.00027081897,0.22076371,0.0007152625,0.00007910951,0.000056109664,0.0007939796,0.0016075374,0.0021439546],"genre_scores_gemma":[0.9883923,0.00005253072,0.010727734,0.000024878607,0.000012599426,0.00001303938,0.00024560886,0.000017004093,0.0005143059],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998754,0.00003031539,0.000005473983,0.000043633725,0.000021630272,0.00002359853],"domain_scores_gemma":[0.9997632,0.00012329705,0.00003315566,0.000025500603,0.000035887613,0.000018951996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033599098,0.000666845,0.00051137904,0.00029495065,0.00019449818,0.00043056262,0.00052292267,0.00045814516,0.0006719477],"category_scores_gemma":[0.0008243113,0.00025227043,0.00033807996,0.00040314457,0.00018236226,0.0005755372,0.00025208335,0.0006788497,0.00017071693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087705535,0.000115069706,0.007940397,0.0000150199385,0.000025748177,0.000046174177,0.000019418829,0.9686175,0.0012056937,0.0005803474,0.000880355,0.020466663],"study_design_scores_gemma":[0.0000015249851,0.0000064277724,0.0005829798,4.811322e-7,0.000001461154,0.0000015361969,0.0000026710802,0.99889934,0.00020782187,0.00024250077,0.000052066425,0.0000012189588],"about_ca_topic_score_codex":0.020927293,"about_ca_topic_score_gemma":0.029919123,"teacher_disagreement_score":0.020927293,"about_ca_system_score_codex":0.0005694225,"about_ca_system_score_gemma":0.0004293523,"threshold_uncertainty_score":0.041610956},"labels":[],"label_agreement":null},{"id":"W2890286150","doi":"10.1016/j.esr.2018.08.010","title":"Valuing infrastructure investments to reduce curtailment","year":2018,"lang":"en","type":"article","venue":"Energy Strategy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; British Columbia Institute of Technology","funders":"British Columbia Institute of Technology; Pacific Institute for Climate Solutions","keywords":"Dispatchable generation; CVAR; Environmental economics; Renewable energy; Reliability engineering; Business; Engineering; Economics; Expected shortfall; Portfolio; Finance; Distributed generation","score_opus":0.023170467912885316,"score_gpt":0.26177455469301053,"score_spread":0.2386040867801252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2890286150","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20325862,0.28730488,0.039503526,0.049186595,0.0031060139,0.0001989771,0.000684192,0.00025876696,0.41649842],"genre_scores_gemma":[0.88247937,0.10113921,0.0042142123,0.0008649538,0.0004064537,0.000051258474,0.00015691046,0.000051970477,0.010635588],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819946,0.00065774616,0.000061387,0.000113251765,0.00076330896,0.00020480467],"domain_scores_gemma":[0.9947966,0.00336097,0.0005172885,0.00017020639,0.0010251688,0.00012979492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041197347,0.0009945773,0.0006006938,0.0021984251,0.00026401976,0.0039365925,0.000615939,0.0021426466,0.0034484926],"category_scores_gemma":[0.010402736,0.00021960512,0.00044189126,0.0026814905,0.0007291957,0.003142972,0.00051507296,0.0013418997,0.00035335607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036722454,0.00018152114,0.003149803,0.00265207,0.00045180545,0.00017573677,0.0002821729,0.08017592,0.004016389,0.37339392,0.022699945,0.51245344],"study_design_scores_gemma":[0.000202311,0.0013178829,0.019879242,0.009275132,0.001286684,0.00024285703,0.0035594653,0.081802666,0.017380655,0.40947595,0.45533293,0.00024420244],"about_ca_topic_score_codex":0.003870755,"about_ca_topic_score_gemma":0.006807639,"teacher_disagreement_score":0.0048413803,"about_ca_system_score_codex":0.0048413803,"about_ca_system_score_gemma":0.003494029,"threshold_uncertainty_score":0.035126865},"labels":[],"label_agreement":null},{"id":"W2891461321","doi":"10.1016/j.dib.2019.103744","title":"HUE: The hourly usage of energy dataset for buildings in British Columbia","year":2019,"lang":"en","type":"article","venue":"Data in Brief","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Hue; Microgrid; Computer science; Consumption (sociology); Grid; Database; Meteorology; Geography; Artificial intelligence","score_opus":0.012763119394168717,"score_gpt":0.21549747800071492,"score_spread":0.2027343586065462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2891461321","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003105895,0.00008254432,0.00008987624,0.00004502909,0.000014114411,0.000010614847,0.99495524,0.00025347288,0.0014432076],"genre_scores_gemma":[0.005866136,0.00007910466,0.00020150596,0.000016198555,0.0000033755068,0.00002527556,0.99257165,0.000032641197,0.0012041626],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966645,0.000021454249,0.00002860232,0.00007939333,0.00012119495,0.00008292544],"domain_scores_gemma":[0.9990087,0.00005395392,0.00004895401,0.00012464573,0.0006561615,0.000107591906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020248591,0.0010870782,0.0007636859,0.0025549557,0.00070059096,0.0012233475,0.0013343253,0.0006355652,0.012963459],"category_scores_gemma":[0.0012837034,0.00034884264,0.00055314257,0.0070459847,0.00018728976,0.0004990289,0.00064609706,0.00085725763,0.01160167],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010172295,0.000050450006,0.015511364,0.0003389478,0.0000664142,0.00007024819,0.00006084956,0.0020157632,0.00031749933,0.00044761642,0.97229093,0.008728247],"study_design_scores_gemma":[0.00009891339,0.000022920463,0.17063586,0.00039959344,0.00005417211,0.00011658047,0.00074996304,0.009354644,0.0011833259,0.00078783697,0.8164915,0.00010473483],"about_ca_topic_score_codex":0.8315715,"about_ca_topic_score_gemma":0.9126235,"teacher_disagreement_score":0.16842848,"about_ca_system_score_codex":0.0042256685,"about_ca_system_score_gemma":0.0038298175,"threshold_uncertainty_score":0.33884072},"labels":[],"label_agreement":null},{"id":"W2895555982","doi":"","title":"Multistage Expansion Planning of Active Distribution Systems: Towards Network Integration of Distributed Energy Resources","year":2018,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Saskatchewan","keywords":"Distributed generation; Computer science; Energy (signal processing); Distribution (mathematics); Distributed computing; Engineering; Electrical engineering; Mathematics; Renewable energy; Statistics","score_opus":0.010035771481950942,"score_gpt":0.2302453160969008,"score_spread":0.22020954461494985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895555982","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061296923,0.00032553772,0.9885731,0.00013028606,0.000013410239,0.000050311737,0.00004665192,0.00010926862,0.0046217614],"genre_scores_gemma":[0.44476864,0.0017740678,0.5450667,0.00010059365,0.000051324245,0.00025105773,0.00026208846,0.00009971569,0.0076257843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959236,0.00017838582,0.0000144180385,0.000057996796,0.00012484074,0.000031915995],"domain_scores_gemma":[0.9996352,0.00017440745,0.000051978026,0.000024222982,0.000091227936,0.000022876757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008545483,0.0007677864,0.00043818238,0.0004708585,0.00026211108,0.0010347451,0.0011411296,0.00056103873,0.0021020041],"category_scores_gemma":[0.0014421276,0.0005033524,0.00041705015,0.0009513054,0.0005655853,0.0011980485,0.0009484365,0.00088826864,0.0003012619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015257821,0.000011266431,0.00020758901,0.00004397516,0.000007799609,0.000043698074,0.00004499903,0.9585533,0.00062652025,0.018785506,0.00041382475,0.021246161],"study_design_scores_gemma":[0.0000025422905,0.00001069882,0.000044344783,0.00001317503,0.0000035462142,0.0000086463715,0.000009581255,0.98933256,0.00030089612,0.008051282,0.0022198935,0.0000028172142],"about_ca_topic_score_codex":0.0065585556,"about_ca_topic_score_gemma":0.007250017,"teacher_disagreement_score":0.0065585556,"about_ca_system_score_codex":0.0010157726,"about_ca_system_score_gemma":0.0011352369,"threshold_uncertainty_score":0.013040781},"labels":[],"label_agreement":null},{"id":"W2895637174","doi":"10.22215/etd/2015-11041","title":"Fast Demand Control in Smart Grid Communications with User-in-the-Loop (UIL) Method","year":2015,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Dynamic pricing; Smart grid; Incentive; Electricity; Demand response; Consumption (sociology); Electricity price; Environmental economics; Variety (cybernetics); Control (management); Electricity pricing; Computer science; Microeconomics; Electricity market; Economics; Engineering; Electrical engineering","score_opus":0.013923622816645108,"score_gpt":0.26804273489833624,"score_spread":0.25411911208169113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895637174","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018711617,0.0005104087,0.9744092,0.00020209333,0.00011522698,0.000044295815,0.00002656853,0.00044975593,0.0055307816],"genre_scores_gemma":[0.9389903,0.00031713198,0.055341784,0.00011085627,0.00008260804,0.00007434565,0.00003750543,0.000050659597,0.0049948734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965787,0.00012120824,0.000014394994,0.000057167148,0.00010180539,0.000047622805],"domain_scores_gemma":[0.9996189,0.00022275672,0.000028223463,0.00002812405,0.0000888613,0.00001305806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060868653,0.00030853038,0.00046261435,0.00020298734,0.00035034472,0.0005754113,0.00050824636,0.00035747126,0.0031380574],"category_scores_gemma":[0.0013174628,0.00015387798,0.00022381722,0.0002714966,0.0004038991,0.0006489832,0.00046094015,0.00061516865,0.00043277524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005158564,0.00016553902,0.0007727175,0.0002582525,0.000040924653,0.00015362744,0.0003676337,0.5573365,0.016507963,0.04281321,0.006400158,0.3746676],"study_design_scores_gemma":[0.000008295844,0.000032478794,0.0000571031,0.000004379347,0.000002383163,0.000015523497,0.000008523114,0.99637765,0.0009964915,0.0016729977,0.00081959146,0.0000046023542],"about_ca_topic_score_codex":0.0026541324,"about_ca_topic_score_gemma":0.0027282138,"teacher_disagreement_score":0.0031380574,"about_ca_system_score_codex":0.00039991795,"about_ca_system_score_gemma":0.00041086558,"threshold_uncertainty_score":0.010497868},"labels":[],"label_agreement":null},{"id":"W2895989523","doi":"10.1109/sege.2018.8499472","title":"Effects of Centralized Battery Storage Placement in Low-Voltage Residential Distribution Networks with High Photovoltaic Penetration","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Photovoltaic system; Voltage; Electrical engineering; Low voltage; Automotive engineering; Energy storage; Battery storage; Battery (electricity); Penetration (warfare); Computer science; Power (physics); Environmental science; Engineering","score_opus":0.0024265476997487813,"score_gpt":0.171401137835301,"score_spread":0.16897459013555222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895989523","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98191446,0.00022176496,0.012278344,0.00013346713,0.000027425858,0.000035907873,0.00017769389,0.0002710074,0.004939968],"genre_scores_gemma":[0.99914944,0.00003336934,0.0005514767,0.000010270518,0.0000017492488,0.0000029555713,0.000024043471,0.0000056634867,0.0002209192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994911,0.00021442579,0.000018239665,0.00006576963,0.00009397312,0.000116456824],"domain_scores_gemma":[0.99698824,0.0018426612,0.00040086187,0.0001884927,0.00045030197,0.00012942207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006100813,0.00052332605,0.00054575736,0.00030382499,0.0004435767,0.00073292933,0.0005271537,0.0005665127,0.0021492725],"category_scores_gemma":[0.0033904954,0.00023156694,0.00024137796,0.00056260644,0.000688869,0.0011727286,0.00045118117,0.00054481014,0.00021156034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005574644,0.0001568348,0.008632304,0.00009724581,0.00003898829,0.0006794088,0.00007537808,0.9645943,0.012381601,0.0010175498,0.00044688897,0.011321964],"study_design_scores_gemma":[0.00011987442,0.002108392,0.02655675,0.000056696106,0.00012492601,0.0004163299,0.0011096045,0.9369279,0.029513896,0.0022195273,0.0007978534,0.00004821681],"about_ca_topic_score_codex":0.00903416,"about_ca_topic_score_gemma":0.015864952,"teacher_disagreement_score":0.00903416,"about_ca_system_score_codex":0.0012558828,"about_ca_system_score_gemma":0.0004424833,"threshold_uncertainty_score":0.017963171},"labels":[],"label_agreement":null},{"id":"W2896682231","doi":"10.11606/t.55.2018.tde-18102018-104924","title":"Soluções de tomadas de decisões inteligentes para infraestruturas residenciais","year":2018,"lang":"pt","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Computer science; Context (archaeology); Home automation; Process (computing); Node (physics); Wireless sensor network; Energy consumption; Service (business); Decision-making; Computer network; Computer security; Engineering; Telecommunications; Business; Operations management","score_opus":0.01699177592424355,"score_gpt":0.2700450799693697,"score_spread":0.25305330404512616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896682231","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.495238,0.0076426445,0.37744185,0.0020487828,0.0016264876,0.0010125091,0.00097134477,0.01106908,0.102949254],"genre_scores_gemma":[0.83305144,0.0025136103,0.13563755,0.00033586728,0.00019025718,0.00035301023,0.0006782487,0.0005280126,0.026711974],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899644,0.00015616047,0.000055153134,0.00025639066,0.00035055642,0.00018533712],"domain_scores_gemma":[0.99834573,0.000520909,0.00017561007,0.0002905757,0.00050888024,0.00015817789],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013223662,0.0010286268,0.000852784,0.0011461142,0.0011466924,0.0023028937,0.001362642,0.00080573076,0.011334323],"category_scores_gemma":[0.0044084783,0.0004936892,0.0009033267,0.0007143493,0.0007755292,0.002286749,0.001517283,0.001285177,0.0031462933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00185009,0.0006909791,0.010530845,0.001292809,0.00013795105,0.0009662572,0.002117736,0.032033343,0.064887665,0.019611677,0.012959345,0.8529213],"study_design_scores_gemma":[0.00046725932,0.004082641,0.028227847,0.0011817992,0.0007871481,0.0019725554,0.005188909,0.39678696,0.23198995,0.030522788,0.2984935,0.00029867544],"about_ca_topic_score_codex":0.0024938865,"about_ca_topic_score_gemma":0.005968841,"teacher_disagreement_score":0.011334323,"about_ca_system_score_codex":0.0009980538,"about_ca_system_score_gemma":0.0010227769,"threshold_uncertainty_score":0.037917137},"labels":[],"label_agreement":null},{"id":"W2897090075","doi":"10.1109/sege.2018.8499437","title":"Hybrid Planning Tool for Solar and Battery Systems in Ontario","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Net metering; Photovoltaic system; Renewable energy; Robustness (evolution); Computer science; Electricity; Sizing; Energy storage; Environmental economics; Grid; Variable renewable energy; Distributed generation; Reliability engineering; Engineering; Electrical engineering; Economics","score_opus":0.014522278905997185,"score_gpt":0.1964996390409005,"score_spread":0.18197736013490332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897090075","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12600394,0.00043374108,0.7291633,0.00084769784,0.0000802831,0.00043517989,0.010198143,0.0036170422,0.12922062],"genre_scores_gemma":[0.813848,0.00025573678,0.15647663,0.00008369775,0.000015621095,0.00034108077,0.002955429,0.0003803032,0.025643535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998535,0.000026172782,0.0000064629758,0.000023830498,0.000054528686,0.000035618308],"domain_scores_gemma":[0.9996809,0.0001620242,0.000028988952,0.000018571232,0.000091611975,0.000017957009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000342213,0.00056297437,0.0003523882,0.0005798532,0.00063637283,0.0009641874,0.000857718,0.0006409739,0.021302745],"category_scores_gemma":[0.0011663735,0.000498272,0.0005811908,0.0007601257,0.00038447513,0.0005069898,0.00060748623,0.0003860717,0.00087458856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003547919,0.000008469764,0.0008446812,0.000040764702,0.000011969026,0.00006725041,0.000041704912,0.9796513,0.00033320877,0.008260614,0.0016760678,0.009028542],"study_design_scores_gemma":[0.000011121656,0.000007195035,0.0002116307,0.000005837535,0.0000056853396,0.000007828265,0.000026339663,0.99337584,0.00020102462,0.0025833067,0.0035600485,0.0000041430735],"about_ca_topic_score_codex":0.50950253,"about_ca_topic_score_gemma":0.66736317,"teacher_disagreement_score":0.49049747,"about_ca_system_score_codex":0.004756087,"about_ca_system_score_gemma":0.006875926,"threshold_uncertainty_score":0.98677224},"labels":[],"label_agreement":null},{"id":"W2897163398","doi":"10.1109/sest.2018.8495749","title":"Using a Cluster-Based Method for Controlling the Aggregated Power Consumption of Air Conditioners in a Demand-Side Management Program","year":2018,"lang":"en","type":"article","venue":"2018 International Conference on Smart Energy Systems and Technologies (SEST)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Thermostat; Air conditioning; Intermittency; Computer science; Cluster analysis; Automotive engineering; Electric power system; Power consumption; Controller (irrigation); Power (physics); Set (abstract data type); Simulation; Environmental science; Engineering; Electrical engineering; Mechanical engineering; Meteorology","score_opus":0.03947659005157897,"score_gpt":0.30248212655312046,"score_spread":0.26300553650154146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897163398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07113246,0.00008678252,0.9244775,0.000075647455,0.0000631852,0.0001332346,0.000050806386,0.0011172919,0.0028630903],"genre_scores_gemma":[0.8918287,0.000041944273,0.106219664,0.00002909171,0.00002431944,0.0001321148,0.000051648658,0.00005459963,0.0016178401],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998073,0.000033139575,0.000009163356,0.000071975366,0.000053129337,0.000025267995],"domain_scores_gemma":[0.999648,0.00011229645,0.000050923092,0.000029825915,0.00013147053,0.00002759325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038197933,0.00055813376,0.000536666,0.00045146016,0.0005269744,0.00044771345,0.000758378,0.00034731303,0.001388362],"category_scores_gemma":[0.0007303158,0.00021949247,0.00033599656,0.00041747192,0.00026360073,0.00034358108,0.0002918808,0.00039105245,0.00016297943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018848502,0.00013073457,0.0012564044,0.000054790158,0.00007474656,0.000046751302,0.000107286614,0.90034246,0.014332815,0.0020029265,0.00095359236,0.08050897],"study_design_scores_gemma":[0.000006502853,0.000024426818,0.00018867907,8.970382e-7,0.0000059300137,0.000003976798,0.0000053389235,0.9983937,0.0009863804,0.00016542622,0.0002143238,0.000004375016],"about_ca_topic_score_codex":0.01701138,"about_ca_topic_score_gemma":0.018729886,"teacher_disagreement_score":0.01701138,"about_ca_system_score_codex":0.00070856954,"about_ca_system_score_gemma":0.0007032526,"threshold_uncertainty_score":0.03382474},"labels":[],"label_agreement":null},{"id":"W2897193993","doi":"10.2991/iceml-18.2018.47","title":"The Future of Sustaining Energy Using Virtual Power Plant: Challenges and Opportunities for More Efficiently Distributed Energy Resources in Indonesia","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Virtual power plant; Distributed generation; Energy (signal processing); Energy resources; Computer science; Power (physics); Environmental economics; Distributed computing; Renewable energy; Electrical engineering; Engineering; Physics; Economics","score_opus":0.021480662018779177,"score_gpt":0.21209335452856148,"score_spread":0.1906126925097823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897193993","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33471152,0.051427394,0.07575624,0.07919115,0.0013915262,0.00013259465,0.00035630798,0.0005899593,0.45644325],"genre_scores_gemma":[0.94448745,0.020229727,0.012415093,0.0011236861,0.0001368563,0.000029012279,0.00008577432,0.00007347365,0.021418832],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9998294,0.00004509171,0.000008244344,0.000023643486,0.000058749578,0.000034786404],"domain_scores_gemma":[0.9998301,0.000039958675,0.000025917727,0.000015426773,0.000038248654,0.000050390674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003290432,0.00018256095,0.00016563335,0.00019789266,0.0007192882,0.003090898,0.00047124914,0.0006869268,0.003872837],"category_scores_gemma":[0.00030066306,0.00009487065,0.00019886982,0.0003949371,0.0008257527,0.00348841,0.0011693805,0.0010623174,0.0005743064],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016769001,0.00025612637,0.013400954,0.0014180826,0.000046950663,0.0032699774,0.002388178,0.020463241,0.015311567,0.44023308,0.029076392,0.47396773],"study_design_scores_gemma":[0.000021679836,0.00028420243,0.017271554,0.0008840963,0.00004253933,0.0021198972,0.013131811,0.038057595,0.0071752523,0.20788845,0.7130341,0.000088879526],"about_ca_topic_score_codex":0.0018037449,"about_ca_topic_score_gemma":0.0024477944,"teacher_disagreement_score":0.003872837,"about_ca_system_score_codex":0.00093909976,"about_ca_system_score_gemma":0.0016772179,"threshold_uncertainty_score":0.012955964},"labels":[],"label_agreement":null},{"id":"W2897206375","doi":"10.3390/en11102801","title":"A Compendium of Performance Metrics, Pricing Schemes, Optimization Objectives, and Solution Methodologies of Demand Side Management for the Smart Grid","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Smart grid; Computer science; Demand response; Compendium; Renewable energy; Grid; Electric power system; Key (lock); Distributed generation; Operations research; Risk analysis (engineering); Electricity; Power (physics); Engineering; Business; Computer security","score_opus":0.023792829445537775,"score_gpt":0.24602890781100728,"score_spread":0.2222360783654695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897206375","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004353766,0.47699443,0.43543568,0.006386263,0.007943479,0.00045651902,0.0025705253,0.0017753555,0.064083986],"genre_scores_gemma":[0.027687507,0.628358,0.30105674,0.0029991507,0.007402319,0.00062209927,0.005079061,0.0009738014,0.025821349],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979395,0.00032793678,0.00033966114,0.00024873257,0.0010558182,0.000088376946],"domain_scores_gemma":[0.9960342,0.0018546472,0.00031455912,0.0005200621,0.0011949941,0.000081641985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025126932,0.002592107,0.001582266,0.004619516,0.00048876595,0.0031163918,0.0020814203,0.0017803159,0.0068236445],"category_scores_gemma":[0.0062341355,0.0011260321,0.0013398239,0.0066903885,0.0008084171,0.004253125,0.0015413095,0.004206558,0.0044858307],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006631007,0.0001780184,0.00070239237,0.0065339897,0.00008195428,0.00018891983,0.0001756115,0.015289119,0.004413991,0.07555997,0.106722824,0.79008687],"study_design_scores_gemma":[0.000013817623,0.00021785087,0.0015231485,0.0042463895,0.000098789526,0.0011150433,0.00012477904,0.030158242,0.002647633,0.04368899,0.9160305,0.00013483549],"about_ca_topic_score_codex":0.0015387301,"about_ca_topic_score_gemma":0.0017129529,"teacher_disagreement_score":0.0068236445,"about_ca_system_score_codex":0.0012329415,"about_ca_system_score_gemma":0.001737036,"threshold_uncertainty_score":0.022827387},"labels":[],"label_agreement":null},{"id":"W2897281315","doi":"10.1109/sege.2018.8499491","title":"A Mathematical Model for the Aggregated Power Consumptions of Air Conditioners","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Thermostat; Air conditioning; Computer science; Thermal comfort; Intermittency; Automotive engineering; Renewable energy; Grid; Conditioners; Simulation; Environmental science; Engineering; Electrical engineering; Meteorology; Mathematics; Mechanical engineering; Environmental engineering","score_opus":0.01938880339180429,"score_gpt":0.24028502184587366,"score_spread":0.22089621845406937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897281315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01510697,0.0004610618,0.9636901,0.0004732671,0.00015207134,0.00008633996,0.0008362708,0.000326171,0.018867746],"genre_scores_gemma":[0.8773941,0.0016300828,0.063342094,0.00028504306,0.00018911248,0.0008426761,0.0011961752,0.00019853227,0.054922145],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995912,0.000082818995,0.000027520045,0.00011332609,0.0001315457,0.00005367418],"domain_scores_gemma":[0.99957114,0.00017717792,0.00008098093,0.00003155053,0.00012495041,0.00001405711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005893475,0.0010173304,0.0008098458,0.0005802825,0.0004751015,0.001357133,0.0021107914,0.0015691633,0.00529169],"category_scores_gemma":[0.0015277396,0.00049419136,0.0011908783,0.000914067,0.0005432687,0.0017932021,0.0006399436,0.0017291239,0.0014095953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015989566,0.000025651087,0.0003347698,0.00006285646,0.000014897107,0.000093670234,0.00006126505,0.9672906,0.0014529953,0.025244333,0.0009979474,0.004404946],"study_design_scores_gemma":[0.00000323823,0.000009049747,0.00009068828,0.0000033236897,0.000004439151,0.000017754166,0.0000059928684,0.9965653,0.00013709358,0.0023711594,0.0007880461,0.0000039557062],"about_ca_topic_score_codex":0.00900299,"about_ca_topic_score_gemma":0.005838256,"teacher_disagreement_score":0.00900299,"about_ca_system_score_codex":0.001085387,"about_ca_system_score_gemma":0.0009390752,"threshold_uncertainty_score":0.017901182},"labels":[],"label_agreement":null},{"id":"W2897437642","doi":"10.3390/en11102683","title":"Schedule-Based Operation Method Using Market Data for an Energy Storage System of a Customer in the Ontario Electricity Market","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Chosun University","keywords":"Electricity market; Schedule; Electricity; Computer science; Energy storage; Electricity retailing; Environmental economics; Order (exchange); Operations research; Electric power system; Reliability engineering; Business; Power (physics); Economics; Electrical engineering; Engineering; Finance","score_opus":0.038120063518389084,"score_gpt":0.27459596294455274,"score_spread":0.23647589942616365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897437642","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6387427,0.0005552946,0.34646317,0.0001746714,0.000058052276,0.00040083964,0.0022664112,0.0011170219,0.010221903],"genre_scores_gemma":[0.95787877,0.00014220097,0.03863061,0.000009243019,0.0000146221055,0.00010102077,0.001432812,0.000028167487,0.0017625318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996774,0.000052889907,0.000020824125,0.000058018162,0.00015539472,0.000035395373],"domain_scores_gemma":[0.99940217,0.0001282093,0.00006492462,0.000027399888,0.00035838052,0.000018898432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047194524,0.0006445466,0.00044482836,0.0010109503,0.000369516,0.0005997333,0.0005557744,0.00025647331,0.0013755535],"category_scores_gemma":[0.0017192649,0.00018751311,0.0003273954,0.0009985403,0.00015864983,0.00042494922,0.00022432566,0.00023177701,0.00019545206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037041903,0.000112018315,0.02703939,0.0003699202,0.000086262815,0.00033838412,0.00031367785,0.7713923,0.012232873,0.003571999,0.0032787623,0.18089402],"study_design_scores_gemma":[0.000012272471,0.00003037515,0.005572239,0.0000034697896,0.000013564697,0.000018621742,0.00006962237,0.99160343,0.0017437394,0.00020791289,0.0007142056,0.000010640465],"about_ca_topic_score_codex":0.23508316,"about_ca_topic_score_gemma":0.18231702,"teacher_disagreement_score":0.76491684,"about_ca_system_score_codex":0.0018021762,"about_ca_system_score_gemma":0.0020012436,"threshold_uncertainty_score":0.46742964},"labels":[],"label_agreement":null},{"id":"W2898893905","doi":"10.23919/ipec.2018.8507562","title":"A Dynamic Battery Charging Approach for Energy Trading in the Smart Grid","year":2018,"lang":"en","type":"article","venue":"2018 International Power Electronics Conference (IPEC-Niigata 2018 -ECCE Asia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Battery (electricity); Profitability index; Computer science; Profit (economics); Grid; Dynamic pricing; Trading strategy; Energy market; Energy storage; Business; Renewable energy; Electrical engineering; Microeconomics; Engineering; Economics; Finance; Power (physics)","score_opus":0.015580963494535404,"score_gpt":0.23405983942005976,"score_spread":0.21847887592552434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898893905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035802476,0.0005573217,0.9472307,0.0003996529,0.000086892265,0.00006864604,0.00003679776,0.00013239936,0.015685083],"genre_scores_gemma":[0.962821,0.00026206826,0.033398967,0.000060153092,0.000036521076,0.0000395122,0.000015520287,0.000019152096,0.003347162],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966156,0.00013050507,0.000012445121,0.00005344004,0.00009614483,0.00004597633],"domain_scores_gemma":[0.9998276,0.00007600543,0.000017360948,0.000027227767,0.000034555083,0.000017124697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048211825,0.0004018174,0.0005981862,0.00019985238,0.00038951993,0.0010446442,0.0009605802,0.0006732203,0.0025360303],"category_scores_gemma":[0.00075771305,0.00019024346,0.00051457336,0.0003763434,0.00060723996,0.001538525,0.0007620945,0.0008184509,0.00021863988],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088028384,0.000078927245,0.0005537009,0.00009635314,0.000046467085,0.0002448495,0.00009587595,0.7686927,0.006647314,0.17645954,0.0010654721,0.0459308],"study_design_scores_gemma":[0.000010599102,0.000044498945,0.00008399927,0.0000039234747,0.000007759898,0.0000714843,0.00001923783,0.96907914,0.00071567175,0.028255615,0.001699192,0.000008921152],"about_ca_topic_score_codex":0.0014186408,"about_ca_topic_score_gemma":0.0015528396,"teacher_disagreement_score":0.0025360303,"about_ca_system_score_codex":0.000566323,"about_ca_system_score_gemma":0.00075300754,"threshold_uncertainty_score":0.008483887},"labels":[],"label_agreement":null},{"id":"W2899678466","doi":"10.1049/iet-its.2018.5180","title":"Optimising total entry delay at roundabouts with unbalanced flow: a dynamic strategy for smart metering","year":2018,"lang":"en","type":"article","venue":"IET Intelligent Transport Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metering mode; Automotive engineering; Computer science; Flow (mathematics); Transport engineering; Engineering; Mathematics; Mechanical engineering","score_opus":0.016067898277469288,"score_gpt":0.22606236522247738,"score_spread":0.2099944669450081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899678466","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23626882,0.00030027784,0.7544857,0.00019691819,0.000043347,0.00014615669,0.0000916305,0.00033323417,0.008133879],"genre_scores_gemma":[0.98358786,0.00006807125,0.01521499,0.000014385136,0.000004047048,0.000034765795,0.000027030199,0.000012140492,0.0010366582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980146,0.000052667736,0.0000075309017,0.000042229327,0.000031533436,0.00006454008],"domain_scores_gemma":[0.9996835,0.00013102146,0.00008490774,0.000012971398,0.000046414767,0.00004126424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042387325,0.0009579535,0.00069317326,0.00056910963,0.00029314918,0.00095143315,0.00074608735,0.000776074,0.0017303744],"category_scores_gemma":[0.0008534664,0.00034786825,0.0003889869,0.00039473156,0.00032951063,0.0007304696,0.00059885683,0.0003806284,0.00019469707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106149164,0.00004114078,0.0004438317,0.00004611364,0.000017232102,0.000076069664,0.000038151353,0.97933495,0.0051754564,0.0017677622,0.00021113583,0.012742018],"study_design_scores_gemma":[0.000014400189,0.000097260214,0.00026474072,0.000004447967,0.000013683376,0.000016293914,0.00003280271,0.99750215,0.0011746269,0.0005752824,0.00029792887,0.0000063242173],"about_ca_topic_score_codex":0.004247083,"about_ca_topic_score_gemma":0.0040015057,"teacher_disagreement_score":0.004247083,"about_ca_system_score_codex":0.00081612775,"about_ca_system_score_gemma":0.0009048911,"threshold_uncertainty_score":0.0084447265},"labels":[],"label_agreement":null},{"id":"W2900330031","doi":"10.1007/s12667-018-0312-x","title":"Co-optimization of demand response and interruptible load reserve offers for a price-making major consumer","year":2018,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Flexibility (engineering); Electricity; Demand response; Intuition; Electricity market; Computer science; Consumption (sociology); Robust optimization; Microeconomics; Optimization problem; Mathematical optimization; Economics; Operations research; Engineering; Mathematics","score_opus":0.014864822966367451,"score_gpt":0.24663680992853032,"score_spread":0.23177198696216286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900330031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8016916,0.0003377356,0.16429655,0.0013346432,0.00019157788,0.0003311748,0.00036475426,0.0011295795,0.030322326],"genre_scores_gemma":[0.9949201,0.00001376291,0.003080016,0.000022371814,0.000009380898,0.000014537168,0.000026461541,0.000026457303,0.0018869722],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995409,0.00012990252,0.000014244371,0.0000885289,0.00007488849,0.00015148435],"domain_scores_gemma":[0.9989236,0.00062828476,0.00010965002,0.000048086273,0.00017278096,0.000117542426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010450607,0.00084745226,0.0010531347,0.00055996276,0.0006292256,0.0017435073,0.0010639111,0.0011707704,0.0054875123],"category_scores_gemma":[0.0022416678,0.00063734764,0.0005335204,0.0004877304,0.00045689565,0.0012296173,0.0006539916,0.0012348655,0.00041954292],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00092010805,0.0003859181,0.0014468818,0.00007222875,0.000050039027,0.00012788032,0.000052286243,0.9684709,0.0037038422,0.0027565795,0.0016810169,0.020332286],"study_design_scores_gemma":[0.000021902924,0.00015388597,0.0005734245,0.0000023190946,0.000021045344,0.000013503244,0.000037124137,0.99768734,0.00068155973,0.0005700847,0.00023088686,0.000006802957],"about_ca_topic_score_codex":0.0059911907,"about_ca_topic_score_gemma":0.010681703,"teacher_disagreement_score":0.0059911907,"about_ca_system_score_codex":0.001183791,"about_ca_system_score_gemma":0.0012271018,"threshold_uncertainty_score":0.018357515},"labels":[],"label_agreement":null},{"id":"W2901173008","doi":"10.5539/ijef.v10n12p127","title":"“Take Photos to Make Money” APP’s Task Pricing","year":2018,"lang":"en","type":"article","venue":"International Journal of Economics and Finance","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Task (project management); Crowdsourcing; Computer science; Scheme (mathematics); CONTEST; Cluster analysis; The Internet; Pricing strategies; Service (business); Variety (cybernetics); Marketing; Economics; Artificial intelligence; Business; World Wide Web; Management; Mathematics","score_opus":0.0074793789790916195,"score_gpt":0.19475689621539133,"score_spread":0.1872775172362997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901173008","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.348988,0.00075926224,0.19985402,0.0065982244,0.0026348897,0.003353951,0.0026977703,0.013252602,0.42186132],"genre_scores_gemma":[0.840943,0.00022777851,0.056134626,0.0006541289,0.00033177817,0.00085274625,0.0010852274,0.0006584218,0.099112324],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989505,0.00022694009,0.000057518933,0.00013898047,0.00042432293,0.00020169672],"domain_scores_gemma":[0.99799013,0.00046610375,0.00012654382,0.00053014176,0.00058454263,0.00030252617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010910451,0.00059581036,0.00038175256,0.00068180077,0.0010531663,0.0011257994,0.00108047,0.0009300613,0.03166213],"category_scores_gemma":[0.0056883395,0.00019020737,0.00038165285,0.0004924233,0.00058354595,0.0023580124,0.0010246807,0.0009351278,0.0072652986],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021580777,0.0013323404,0.011159401,0.00047227932,0.00006672791,0.0007638054,0.0008804729,0.011357459,0.015257639,0.08318759,0.17500001,0.69836426],"study_design_scores_gemma":[0.0004880373,0.0013795681,0.048505053,0.0001897052,0.00013676468,0.0014067845,0.0014363719,0.38426724,0.026081122,0.061603133,0.4741021,0.00040412857],"about_ca_topic_score_codex":0.004338763,"about_ca_topic_score_gemma":0.0054200683,"teacher_disagreement_score":0.03166213,"about_ca_system_score_codex":0.0007079334,"about_ca_system_score_gemma":0.0008400124,"threshold_uncertainty_score":0.105920374},"labels":[],"label_agreement":null},{"id":"W2901459783","doi":"10.4095/299224","title":"Data issues and promising practices for integrated community energy mapping","year":2016,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Data science; Computer science; Energy (signal processing); Mathematics; Statistics","score_opus":0.18379186345259738,"score_gpt":0.3489185264256712,"score_spread":0.16512666297307385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901459783","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027495684,0.004447166,0.52897024,0.20377202,0.004345844,0.0030718793,0.04500545,0.005637999,0.17725378],"genre_scores_gemma":[0.15557994,0.0033378059,0.7643047,0.0069771474,0.00065686245,0.0023388665,0.04248486,0.0009617918,0.02335793],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9646481,0.020813264,0.0025049895,0.0023372462,0.008414158,0.0012823],"domain_scores_gemma":[0.83526546,0.05856945,0.004229535,0.052902367,0.04560706,0.0034261688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.056149326,0.0012239517,0.0014262749,0.00538576,0.0032973895,0.020646611,0.0094360495,0.005709937,0.026167098],"category_scores_gemma":[0.16391346,0.0011093266,0.0013068477,0.015094631,0.0036968463,0.037075043,0.009440779,0.0066032703,0.009031722],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046862825,0.00082564825,0.02289583,0.0011475816,0.00019976002,0.00022934291,0.0025743209,0.013861744,0.0016986638,0.45952854,0.16466458,0.33190534],"study_design_scores_gemma":[0.00015551294,0.00012449664,0.005646036,0.0021390303,0.00008684919,0.00023690346,0.0066407993,0.02653761,0.005276373,0.41778454,0.53522784,0.0001440335],"about_ca_topic_score_codex":0.048550323,"about_ca_topic_score_gemma":0.044784624,"teacher_disagreement_score":0.056149326,"about_ca_system_score_codex":0.00461687,"about_ca_system_score_gemma":0.016934223,"threshold_uncertainty_score":0.2969495},"labels":[],"label_agreement":null},{"id":"W2904502618","doi":"","title":"CIGRE' Task Force C6.04.02: Developing benchmark models for integrating distributed energy resources","year":2005,"lang":"en","type":"article","venue":"CINECA IRIS Institutial research information system (University of Pisa)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmark (surveying); Task (project management); Task force; Computer science; Energy (signal processing); Energy resources; Environmental science; Engineering; Systems engineering; Physics; Geography; Political science; Cartography","score_opus":0.03328374709269871,"score_gpt":0.24127568752432013,"score_spread":0.20799194043162142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2904502618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008818467,0.002996572,0.8049379,0.005965633,0.0018546772,0.0025213952,0.024796762,0.0054752287,0.14263335],"genre_scores_gemma":[0.101183996,0.006030422,0.7536958,0.0016694341,0.0007925974,0.005341323,0.082057975,0.0040520136,0.045176428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99363834,0.0029523736,0.0002631643,0.00031426369,0.00245625,0.00037560126],"domain_scores_gemma":[0.98985475,0.0029681553,0.00045050387,0.0013440849,0.0050193584,0.00036315198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017313346,0.0027499762,0.0027166684,0.003080643,0.0013040955,0.004136937,0.006927253,0.004524693,0.011773859],"category_scores_gemma":[0.017749894,0.0012695162,0.0019223802,0.0037948466,0.0007924451,0.0030403286,0.0026190495,0.0023228873,0.0058198078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002651892,0.00032185417,0.0024124717,0.0009983142,0.000118543416,0.00018849134,0.00012932785,0.52968705,0.0022402299,0.11358056,0.22475244,0.1253055],"study_design_scores_gemma":[0.0002130074,0.00039869742,0.0013210628,0.0012351947,0.00010028477,0.0001321142,0.00020691323,0.6039137,0.0038490756,0.038386453,0.35011435,0.00012914083],"about_ca_topic_score_codex":0.037935685,"about_ca_topic_score_gemma":0.02431096,"teacher_disagreement_score":0.037935685,"about_ca_system_score_codex":0.0036973278,"about_ca_system_score_gemma":0.008343086,"threshold_uncertainty_score":0.09156281},"labels":[],"label_agreement":null},{"id":"W2905682373","doi":"10.1109/pesgm.2018.8586325","title":"PV-STATCOM – A New Smart Inverter for Voltage Control in Distribution Systems","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Inverter; Voltage; Voltage source inverter; Computer science; Control (management); Control theory (sociology); Control system; Control engineering; Electrical engineering; Engineering","score_opus":0.00877816048496761,"score_gpt":0.19653189467235116,"score_spread":0.18775373418738356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905682373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06115243,0.0033309106,0.87654394,0.00058969687,0.0006609294,0.0001186114,0.0002661046,0.0046256976,0.052711595],"genre_scores_gemma":[0.91054004,0.0017590536,0.06864322,0.00034378117,0.00028975226,0.00006909024,0.00034474625,0.00013886722,0.01787151],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998716,0.000019080731,0.000006322739,0.000020705145,0.000073625844,0.000008623758],"domain_scores_gemma":[0.9999447,0.0000103465045,0.0000075285047,0.000010876713,0.000020869838,0.0000056607773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009390972,0.0002147114,0.00021387001,0.00025921408,0.00016602819,0.00046421436,0.0004655584,0.00036851128,0.00247898],"category_scores_gemma":[0.0001303592,0.00008748631,0.0001599252,0.00035324777,0.00022673619,0.0005196252,0.00021214917,0.00048122794,0.0006827527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037556273,0.00023016901,0.0021683264,0.0005470016,0.00009407173,0.00065339595,0.00011110076,0.04076884,0.20018694,0.04839919,0.015510807,0.6909545],"study_design_scores_gemma":[0.00020571383,0.0015819084,0.003757097,0.00011155487,0.00013107673,0.0020204168,0.0000828803,0.5059352,0.13897496,0.021423442,0.32571772,0.000058039994],"about_ca_topic_score_codex":0.00028856986,"about_ca_topic_score_gemma":0.00086148694,"teacher_disagreement_score":0.00247898,"about_ca_system_score_codex":0.00024312711,"about_ca_system_score_gemma":0.0001692175,"threshold_uncertainty_score":0.008293033},"labels":[],"label_agreement":null},{"id":"W2906506210","doi":"10.1109/tpwrs.2018.2889773","title":"Material Flow Based Power Demand Modeling of an Oil Refinery Process for Optimal Energy Management","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Cogeneration; Refinery; Electricity generation; Electricity; Oil refinery; Energy management; Distributed generation; Demand response; Energy consumption; Process engineering; Engineering; Renewable energy; Waste management; Power (physics); Energy (signal processing)","score_opus":0.011643027165909668,"score_gpt":0.21897857115378505,"score_spread":0.20733554398787538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906506210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25291607,0.00055074046,0.68052083,0.0009670272,0.00014516542,0.00020473948,0.0020282126,0.00079274713,0.06187453],"genre_scores_gemma":[0.9737751,0.00027337606,0.010411513,0.00005805206,0.000027888023,0.00014369846,0.0004389897,0.00007171105,0.0147996275],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998658,0.000041146435,0.0000060287357,0.000028133412,0.000031432293,0.00002742426],"domain_scores_gemma":[0.9998275,0.00009382624,0.000021511283,0.000008147486,0.00003765377,0.000011329738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002468892,0.00084639556,0.00076907815,0.00041356342,0.0005207249,0.0009946114,0.00091042725,0.0017626112,0.0053963326],"category_scores_gemma":[0.0005328557,0.0005088773,0.0008345108,0.0005235002,0.0003611231,0.0007748994,0.00043291308,0.00076954195,0.0005481837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015006131,0.000017166574,0.00016464539,0.000012934194,0.0000031565623,0.000035946927,0.000009154781,0.9967991,0.0006315158,0.0012798962,0.00016145887,0.000869941],"study_design_scores_gemma":[0.0000014111091,0.0000024511055,0.000027350645,5.85012e-7,8.0988366e-7,0.0000016184928,0.0000023192683,0.99968696,0.000063852676,0.00011856367,0.00009321224,8.5201424e-7],"about_ca_topic_score_codex":0.033712044,"about_ca_topic_score_gemma":0.017528277,"teacher_disagreement_score":0.033712044,"about_ca_system_score_codex":0.0010487745,"about_ca_system_score_gemma":0.0009084382,"threshold_uncertainty_score":0.06703162},"labels":[],"label_agreement":null},{"id":"W2906561131","doi":"10.1002/9781119360124","title":"Transportation and Power Grid in Smart Cities","year":2018,"lang":"en","type":"book","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Power grid; Grid; Power (physics); Computer science; Business; Transport engineering; Geography; Electrical engineering; Engineering; Physics; Geodesy","score_opus":0.005177087518162306,"score_gpt":0.16591856191880613,"score_spread":0.16074147440064382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906561131","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000806721,0.068748504,0.012392865,0.006493149,0.009269279,0.00005048138,0.0003047069,0.00047721597,0.9014571],"genre_scores_gemma":[0.003451577,0.032663517,0.00278349,0.000998904,0.001367014,0.00003728186,0.00030609441,0.00017773821,0.95821434],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997981,0.000026347383,0.000006343745,0.00002220518,0.00012741401,0.000019603518],"domain_scores_gemma":[0.9998735,0.00002844534,0.000007630491,0.00001731191,0.000050408624,0.000022669867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017427509,0.0012578245,0.0005769803,0.0011403325,0.0008050761,0.00292654,0.0007041536,0.0012863654,0.04578194],"category_scores_gemma":[0.00044008825,0.0003878616,0.0003737174,0.0027197278,0.00055934826,0.0038955144,0.001330007,0.0019309968,0.024078684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007603849,0.00002977405,0.00007669464,0.00016187708,0.000005516666,0.000050653834,0.00009508524,0.0016430174,0.00023711256,0.05818465,0.7833967,0.15611143],"study_design_scores_gemma":[0.0000013421758,0.0000036744502,0.00010889347,0.000108656444,0.0000023552325,0.000040525545,0.000049105452,0.00048096513,0.000058342426,0.014309574,0.9848334,0.0000032315434],"about_ca_topic_score_codex":0.005300572,"about_ca_topic_score_gemma":0.013986814,"teacher_disagreement_score":0.04578194,"about_ca_system_score_codex":0.0017878695,"about_ca_system_score_gemma":0.001897991,"threshold_uncertainty_score":0.15315586},"labels":[],"label_agreement":null},{"id":"W2907141168","doi":"10.1109/smartgridcomm.2018.8587535","title":"An Autonomous Demand Response Algorithm based on Online Convex Optimization","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Demand response; Computer science; Mathematical optimization; Convex optimization; Benchmark (surveying); Scheduling (production processes); Schedule; Load management; Jacobian matrix and determinant; Regular polygon; Electricity; Mathematics; Engineering","score_opus":0.007467318266908811,"score_gpt":0.22212537085609937,"score_spread":0.21465805258919057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907141168","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008356366,0.000037423288,0.98776823,0.00016217442,0.0000250601,0.000052040945,0.00003997236,0.00044274854,0.003115975],"genre_scores_gemma":[0.57915455,0.00009941733,0.41329673,0.00023145617,0.000072440365,0.00040271855,0.00031681522,0.00020246231,0.006223449],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951446,0.00013908294,0.000016984799,0.00013023472,0.00013212852,0.000067045235],"domain_scores_gemma":[0.9992679,0.00041203032,0.00009088818,0.00006200631,0.00013013059,0.00003712827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007232085,0.00077991356,0.0009581978,0.0003168254,0.00036804733,0.00079865,0.0010718579,0.0009875223,0.0031600778],"category_scores_gemma":[0.0018049378,0.0004216822,0.0004193362,0.00052427215,0.00052260124,0.00096811063,0.0008513944,0.0015599153,0.0006761824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007357752,0.000108078115,0.00021037363,0.00003861458,0.000014436537,0.00003633043,0.00003136482,0.93884695,0.0018626406,0.0093594985,0.002355917,0.04706217],"study_design_scores_gemma":[0.000008024059,0.000009346542,0.000011536454,6.5894443e-7,7.440454e-7,0.0000036393578,0.0000021833555,0.99862516,0.0001789399,0.0009789574,0.00017967261,0.0000012290584],"about_ca_topic_score_codex":0.0036299196,"about_ca_topic_score_gemma":0.0036902907,"teacher_disagreement_score":0.0036299196,"about_ca_system_score_codex":0.00067311287,"about_ca_system_score_gemma":0.0014792939,"threshold_uncertainty_score":0.010571539},"labels":[],"label_agreement":null},{"id":"W2907198993","doi":"10.1109/iecon.2018.8591684","title":"Transient Event Classification Based on Wavelet Neuronal Network and Matched Filters","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Smart grid; Context (archaeology); Transient (computer programming); Event (particle physics); Wavelet; Feature extraction; Energy (signal processing); Wavelet transform; Data mining; Artificial intelligence; Filter (signal processing); Process (computing); Building automation; Energy consumption; Pattern recognition (psychology); Real-time computing; Engineering; Computer vision; Mathematics","score_opus":0.013112600514417715,"score_gpt":0.2014507847402869,"score_spread":0.1883381842258692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907198993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15805055,0.0005012158,0.8383231,0.00018388213,0.000092560826,0.000064245,0.00019341621,0.00055234606,0.0020387343],"genre_scores_gemma":[0.90650827,0.0005339502,0.08915823,0.000050756986,0.00007725387,0.00008187018,0.0004337982,0.0000282374,0.0031276185],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975747,0.000036696292,0.000016234666,0.000076685785,0.00006647008,0.00004649361],"domain_scores_gemma":[0.9995937,0.00020068152,0.00004856058,0.00002936488,0.00010748574,0.000020224554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056483434,0.00044116378,0.0005567133,0.0009915436,0.0002432579,0.0006593494,0.0005254373,0.00056240504,0.00081234495],"category_scores_gemma":[0.0016921398,0.00019329388,0.0005220103,0.001039944,0.00023663908,0.000970902,0.00035234084,0.0005139266,0.00025121265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005304197,0.00029641073,0.009157576,0.00011056609,0.0001524179,0.00020224505,0.0001013165,0.34085605,0.017858177,0.0065873326,0.0018653608,0.6222821],"study_design_scores_gemma":[0.000002670093,0.000019262861,0.0012954439,0.0000026302844,0.0000085641705,0.000015660087,0.000008752118,0.9965867,0.0012165341,0.00073371636,0.000106442996,0.0000037144073],"about_ca_topic_score_codex":0.0064476687,"about_ca_topic_score_gemma":0.0043155337,"teacher_disagreement_score":0.0064476687,"about_ca_system_score_codex":0.0006210716,"about_ca_system_score_gemma":0.00042373547,"threshold_uncertainty_score":0.012820303},"labels":[],"label_agreement":null},{"id":"W2909155510","doi":"10.1109/epec.2018.8598367","title":"Design and Field Implementation of a Multi-Agent System for Voltage Regulation Using Smart Inverters and Data Distribution Service (DDS)","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto and Region Conservation Authority; York University","funders":"","keywords":"Smart grid; Microgrid; Scalability; Computer science; Interoperability; Asynchronous communication; Distributed computing; Distributed generation; Renewable energy; Embedded system; Computer network; Electrical engineering; Engineering; Control (management); Database","score_opus":0.06271352084665127,"score_gpt":0.29000893966150293,"score_spread":0.22729541881485166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909155510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032775603,0.00012268446,0.95446426,0.00020002239,0.00013805184,0.00051873224,0.0000464014,0.0015956911,0.010138531],"genre_scores_gemma":[0.7205007,0.00010522224,0.27243608,0.00008018287,0.000026281412,0.0004288517,0.000065299966,0.00006497681,0.0062924437],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997186,0.00006672345,0.000017946508,0.000050381495,0.000116699266,0.00002963024],"domain_scores_gemma":[0.99965394,0.00005081337,0.00004554273,0.000050258648,0.00015106864,0.000048314836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046024384,0.0003573014,0.00042008437,0.00025298216,0.00046139667,0.0007386277,0.0012121212,0.00066273723,0.0027938904],"category_scores_gemma":[0.0004548368,0.00020969426,0.00026077827,0.00013642397,0.0003204232,0.0004629726,0.00046771552,0.00060865836,0.0008505086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004829058,0.0010029953,0.0057007074,0.0006694682,0.00012414578,0.00076279166,0.00075700245,0.31754488,0.22801483,0.035304505,0.006164217,0.40347162],"study_design_scores_gemma":[0.00018303932,0.0010781451,0.0009552724,0.000031850443,0.000050064937,0.00018694178,0.00007105701,0.9180934,0.049106818,0.0017970961,0.028412264,0.00003419232],"about_ca_topic_score_codex":0.001181117,"about_ca_topic_score_gemma":0.0011234414,"teacher_disagreement_score":0.0027938904,"about_ca_system_score_codex":0.00044481817,"about_ca_system_score_gemma":0.0007543877,"threshold_uncertainty_score":0.0093464255},"labels":[],"label_agreement":null},{"id":"W2909514544","doi":"10.1109/epec.2018.8598355","title":"A Very Deep One Dimensional Convolutional Neural Network (VDOCNN) for Appliance Power Signature Classification","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Convolutional neural network; Computer science; Signature (topology); Artificial intelligence; Deep learning; Pattern recognition (psychology); Power (physics); Artificial neural network; Mathematics","score_opus":0.015231712713074158,"score_gpt":0.21010280913525853,"score_spread":0.19487109642218436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909514544","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20363106,0.0016778441,0.7786838,0.0008652642,0.00036953128,0.0001022727,0.00089812424,0.004728983,0.009043081],"genre_scores_gemma":[0.8584408,0.00045384836,0.1290668,0.00037337106,0.000040786836,0.00008092686,0.0014035486,0.000056471275,0.010083375],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984634,0.0000154427,0.000008590731,0.000056761484,0.00003500764,0.000037760634],"domain_scores_gemma":[0.99978346,0.000050573475,0.000022289381,0.000030946332,0.0000961121,0.000016681912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028871762,0.00059477607,0.0003312594,0.000327873,0.00023821623,0.00045152684,0.0010088346,0.00072108395,0.0013180871],"category_scores_gemma":[0.000803629,0.00024071538,0.00034291582,0.00037973264,0.0002703397,0.0005716597,0.00041754777,0.00075425435,0.00039364368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026310293,0.00026853255,0.0059446353,0.00013624837,0.00013655954,0.00015214586,0.000060383045,0.4353904,0.02849356,0.004695184,0.00877244,0.5156868],"study_design_scores_gemma":[0.0000037073978,0.00003851558,0.0006464479,0.000008030709,0.000011928316,0.00002271219,0.0000062374356,0.99342054,0.00411216,0.00074722135,0.00097612914,0.0000062414106],"about_ca_topic_score_codex":0.019771712,"about_ca_topic_score_gemma":0.026455697,"teacher_disagreement_score":0.019771712,"about_ca_system_score_codex":0.0010064413,"about_ca_system_score_gemma":0.0007994358,"threshold_uncertainty_score":0.039313257},"labels":[],"label_agreement":null},{"id":"W2909575342","doi":"10.1049/iet-rpg.2018.5737","title":"Parallel stochastic programming for energy storage management in smart grid with probabilistic renewable generation and load models","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Renewable energy; Probabilistic logic; Smart grid; Computer science; Grid; Energy storage; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Artificial intelligence","score_opus":0.01425241482644389,"score_gpt":0.19847024113573739,"score_spread":0.1842178263092935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909575342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021252586,0.00027064327,0.9744228,0.00038332574,0.00005117765,0.00006247216,0.00009004754,0.00024911744,0.003217954],"genre_scores_gemma":[0.8600298,0.0005620396,0.1325901,0.00015415755,0.000093997754,0.00027907378,0.0002232092,0.00013083706,0.0059367153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947053,0.0002411393,0.000018816278,0.000073650794,0.0001057372,0.00009021311],"domain_scores_gemma":[0.9991917,0.00055295834,0.00008723601,0.000029430772,0.00009286668,0.000045812154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013286878,0.0010007155,0.0013778487,0.00034018458,0.0004181128,0.0010201072,0.0007870511,0.0007923084,0.0024627997],"category_scores_gemma":[0.0018395967,0.0006896503,0.0009854791,0.00056703377,0.0006202485,0.0008356762,0.00089091074,0.0014739183,0.00023624187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017637713,0.000010005218,0.00007803483,0.000010946973,0.000008567528,0.000014883469,0.000004785271,0.9951213,0.00011442626,0.002458866,0.00014771427,0.0020128319],"study_design_scores_gemma":[0.0000020527498,0.0000026851121,0.000008892366,5.4548553e-7,8.6488177e-7,9.599789e-7,0.000001056805,0.99903667,0.000023056817,0.00088622444,0.000036377252,5.86164e-7],"about_ca_topic_score_codex":0.011465581,"about_ca_topic_score_gemma":0.013146995,"teacher_disagreement_score":0.011465581,"about_ca_system_score_codex":0.0011110462,"about_ca_system_score_gemma":0.0022388797,"threshold_uncertainty_score":0.022797704},"labels":[],"label_agreement":null},{"id":"W2909649317","doi":"10.2316/journal.203.2018.2.203-0013","title":"MULTI-OBJECTIVE HYBRID EVOLUTIONARY ALGORITHM-BASED DG AND CAPACITOR PLANNING IN DISTRIBUTION SYSTEM","year":2018,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Capacitor; Evolutionary algorithm; Voltage; Mathematical optimization; Computer science; Power loss; Power (physics); Distributed generation; Algorithm; Engineering; Control theory (sociology); Mathematics; Electrical engineering; Physics; Artificial intelligence; Control (management)","score_opus":0.006402086991393854,"score_gpt":0.21296215297032212,"score_spread":0.20656006597892826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909649317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20011726,0.0012029432,0.7841131,0.00040883562,0.00007176524,0.00009083932,0.00014969676,0.00030168486,0.013543976],"genre_scores_gemma":[0.9397833,0.0003076107,0.055737186,0.00005698404,0.000016332553,0.000076538156,0.00006458622,0.00002795102,0.0039294306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998325,0.00006528321,0.0000048691027,0.000024564788,0.00004416735,0.000028505681],"domain_scores_gemma":[0.99979776,0.00012258634,0.000020139445,0.000007769633,0.000036472138,0.00001534253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038800508,0.00052365736,0.00058689294,0.0005152576,0.00026252327,0.0007613233,0.0007149946,0.0007177332,0.001261932],"category_scores_gemma":[0.0007017827,0.00035436187,0.00029869284,0.0007918782,0.00027520565,0.00057964295,0.00032745692,0.0004193158,0.000092081915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009252497,0.0000070441797,0.0000877978,0.000007015131,0.000007864701,0.000013306618,0.0000028159675,0.9960084,0.00010939375,0.00046466346,0.00008007891,0.0032023122],"study_design_scores_gemma":[0.0000026667344,0.0000065705435,0.000036016816,0.0000010829993,0.0000023091434,0.0000029602263,0.000001904421,0.9996271,0.000049500082,0.00020957566,0.000059253332,8.928719e-7],"about_ca_topic_score_codex":0.009643452,"about_ca_topic_score_gemma":0.009862397,"teacher_disagreement_score":0.009643452,"about_ca_system_score_codex":0.00073933305,"about_ca_system_score_gemma":0.0008368926,"threshold_uncertainty_score":0.019174695},"labels":[],"label_agreement":null},{"id":"W2910246042","doi":"10.1049/iet-gtd.2018.5649","title":"Transformation of microgrid to virtual power plant – a comprehensive review","year":2019,"lang":"en","type":"review","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Microgrid; Virtual power plant; Renewable energy; Computer science; Distributed generation; Electric power system; AC power; Reliability engineering; Reliability (semiconductor); Grid; Fault (geology); Control engineering; Engineering; Distributed computing; Power (physics); Electrical engineering","score_opus":0.040848585981257006,"score_gpt":0.2790097579232586,"score_spread":0.2381611719420016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910246042","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00034955068,0.9941117,0.0008640822,0.00032081746,0.00029086668,0.000013106557,0.000036078403,0.000016640512,0.0039970092],"genre_scores_gemma":[0.0024330274,0.9956571,0.0007230248,0.00013509163,0.00016234946,0.0000092148,0.000047803904,0.000004622136,0.00082772685],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998068,0.00003823631,0.000026390768,0.000038652506,0.00007184202,0.000018047142],"domain_scores_gemma":[0.9995658,0.00020978076,0.00005558552,0.000016632248,0.0001260249,0.000026195861],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000509298,0.00076539075,0.0007088475,0.0019190749,0.00023710432,0.0011281908,0.0006468219,0.0007257748,0.0039203037],"category_scores_gemma":[0.000780646,0.00031821305,0.00053079985,0.0028852029,0.00027065072,0.0014534593,0.00052155746,0.000760104,0.0014181553],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004291763,0.00006664382,0.0002487206,0.023898859,0.00008726054,0.0001806617,0.00008351087,0.0020135453,0.001071643,0.01094232,0.022514386,0.93884957],"study_design_scores_gemma":[0.00000633808,0.00011980792,0.0007906335,0.0055473745,0.00011668487,0.00067295233,0.00008489433,0.0005231892,0.0005582337,0.0029781752,0.9885782,0.000023491448],"about_ca_topic_score_codex":0.0018351986,"about_ca_topic_score_gemma":0.0023238887,"teacher_disagreement_score":0.0039203037,"about_ca_system_score_codex":0.00046208108,"about_ca_system_score_gemma":0.0012670102,"threshold_uncertainty_score":0.01311475},"labels":[],"label_agreement":null},{"id":"W2910432267","doi":"10.1109/epec.2018.8598288","title":"Increasing Renewable Energy Penetration through Strategic Deployment of IoT Devices","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Software deployment; Renewable energy; Penetration (warfare); Electricity; Fossil fuel; Internet of Things; Computer science; Electricity generation; Environmental economics; Electrical engineering; Computer security; Engineering; Waste management; Operations research; Power (physics)","score_opus":0.022520324305752952,"score_gpt":0.2247431135017036,"score_spread":0.20222278919595063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910432267","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20222329,0.006447033,0.37904823,0.018134711,0.0010354741,0.0001992507,0.00074467267,0.0017776806,0.39038962],"genre_scores_gemma":[0.95110995,0.003973052,0.036595814,0.000832891,0.00013443224,0.000062616265,0.00038315216,0.000080450736,0.006827648],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961543,0.000101648555,0.000018557446,0.000046791458,0.00013428401,0.00008320758],"domain_scores_gemma":[0.9992874,0.00015712153,0.00009904957,0.00008501012,0.00026187534,0.000109698114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063323946,0.00053066126,0.0002354975,0.0005948535,0.00032483603,0.0013951302,0.00046157616,0.00058319565,0.004932487],"category_scores_gemma":[0.0018115746,0.00018791153,0.00029792095,0.0010923517,0.00036416628,0.0023958415,0.0019585534,0.00081152486,0.0015773936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020484696,0.00023889887,0.021981997,0.00055511226,0.00009674126,0.00070849655,0.0003830967,0.064825505,0.03522045,0.22130692,0.032249235,0.62222874],"study_design_scores_gemma":[0.00011062665,0.00084726495,0.03425543,0.0008127521,0.00023194833,0.0017141507,0.0034910026,0.24703598,0.035620425,0.25487944,0.42083117,0.0001697234],"about_ca_topic_score_codex":0.001472125,"about_ca_topic_score_gemma":0.0032167058,"teacher_disagreement_score":0.004932487,"about_ca_system_score_codex":0.0005202933,"about_ca_system_score_gemma":0.0010613231,"threshold_uncertainty_score":0.01650083},"labels":[],"label_agreement":null},{"id":"W2910438505","doi":"","title":"Demand Response Planner for Building Districts","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Planner; Computer science; Demand response; Architectural engineering; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.012516097209744207,"score_gpt":0.2194129481298134,"score_spread":0.2068968509200692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910438505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11858852,0.00037170682,0.7045048,0.0031043778,0.00018157608,0.0011337732,0.0061322474,0.0042053135,0.16177778],"genre_scores_gemma":[0.8320369,0.00028028587,0.10569836,0.00016186932,0.000053401593,0.00047571544,0.0026110262,0.00045438434,0.058228083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942625,0.00022932551,0.000017500313,0.000118441116,0.00009112905,0.000117417454],"domain_scores_gemma":[0.99918073,0.00039739313,0.000044292425,0.00006878987,0.00018409036,0.00012461962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095780066,0.0006214722,0.0010607308,0.0007668882,0.0007096988,0.002000542,0.001222429,0.0012834962,0.04923758],"category_scores_gemma":[0.002771867,0.00054891384,0.0006029101,0.0013436108,0.000401482,0.0017394887,0.0011532629,0.0010541305,0.0040297424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005418463,0.0001637039,0.0010659635,0.00035690735,0.000027027774,0.00018392071,0.00031663786,0.831892,0.002578112,0.061428387,0.03010473,0.07134079],"study_design_scores_gemma":[0.00006367496,0.00012244876,0.00057717686,0.00003425608,0.000020221172,0.00003191365,0.0007229126,0.9454279,0.0013353816,0.02942811,0.02221355,0.000022440461],"about_ca_topic_score_codex":0.006668072,"about_ca_topic_score_gemma":0.010403242,"teacher_disagreement_score":0.04923758,"about_ca_system_score_codex":0.0018417177,"about_ca_system_score_gemma":0.0015301687,"threshold_uncertainty_score":0.16471612},"labels":[],"label_agreement":null},{"id":"W2910687460","doi":"10.1109/tcsii.2019.2891704","title":"Residential Power Forecasting Using Load Identification and Graph Spectral Clustering","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits & Systems II Express Briefs","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Cluster analysis; Autoregressive model; Computer science; Identification (biology); Spectral clustering; Power (physics); Data mining; Artificial neural network; Energy (signal processing); Autoregressive integrated moving average; Real-time computing; Artificial intelligence; Time series; Machine learning; Statistics; Mathematics","score_opus":0.018542383442507505,"score_gpt":0.20863053079784336,"score_spread":0.19008814735533586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910687460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3623278,0.00086109416,0.61754376,0.0005126674,0.00014887322,0.00013362446,0.005552004,0.006460782,0.0064594327],"genre_scores_gemma":[0.91131735,0.00027683782,0.078748,0.00006349018,0.00007393132,0.00006079777,0.007478582,0.000109678804,0.001871284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997235,0.000061262996,0.0000136956405,0.000097103715,0.000073049436,0.000031316613],"domain_scores_gemma":[0.9996006,0.00012174658,0.00005957819,0.00008702304,0.00010892425,0.000022192578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027963184,0.00077111396,0.00054116244,0.001948074,0.00026889786,0.00048267833,0.0008514917,0.0005283124,0.0007000837],"category_scores_gemma":[0.0013451672,0.00021298521,0.0005028927,0.0018685912,0.00016117484,0.0008967873,0.00038458747,0.00048127663,0.00059460854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023353293,0.00018077738,0.011127806,0.00009077262,0.00012253306,0.00013019316,0.000084133215,0.7630065,0.0036660652,0.002801941,0.011485459,0.20707028],"study_design_scores_gemma":[0.0000023282657,0.00000474062,0.001141885,0.0000018465054,0.0000032672538,0.000009201832,0.000008167648,0.9970866,0.00038465898,0.0009987742,0.0003547555,0.0000038809144],"about_ca_topic_score_codex":0.017742887,"about_ca_topic_score_gemma":0.021403175,"teacher_disagreement_score":0.017742887,"about_ca_system_score_codex":0.0006409703,"about_ca_system_score_gemma":0.00035395147,"threshold_uncertainty_score":0.035279214},"labels":[],"label_agreement":null},{"id":"W2911134710","doi":"10.1109/epec.2018.8598374","title":"Possible Approaches to Trade Non-Electric Energy Sources in the Next Generation Smart Grids","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Smart grid; Electricity; Computer science; Flexibility (engineering); Profit (economics); Electricity generation; Environmental economics; Electric energy; Cogeneration; Energy (signal processing); Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.08554389561997498,"score_gpt":0.2039835036647471,"score_spread":0.11843960804477212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911134710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0952588,0.005863165,0.8209785,0.0019359104,0.00016759126,0.00020463842,0.00019540332,0.00022505288,0.075170964],"genre_scores_gemma":[0.8988611,0.002121063,0.08989375,0.00013547669,0.00004073699,0.00014085278,0.00008592472,0.000050653736,0.008670454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99958044,0.00015478287,0.000022451026,0.000072274306,0.00010015516,0.000069940645],"domain_scores_gemma":[0.9997491,0.00011717144,0.000044360797,0.000026367157,0.000037289687,0.000025750222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009439605,0.0008856383,0.00062478404,0.000665124,0.0005187562,0.0017335734,0.0012917977,0.0010738872,0.0067121657],"category_scores_gemma":[0.0008832605,0.00033480418,0.0010037759,0.00078091427,0.00051611825,0.0021195617,0.001162126,0.00075065583,0.00039779136],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025470756,0.00023484472,0.0013907477,0.00046965765,0.00016904635,0.0005817337,0.00014661545,0.70352113,0.0064431215,0.16810997,0.0021143162,0.11656404],"study_design_scores_gemma":[0.0000544088,0.0002312159,0.0009974162,0.00017855107,0.00011559301,0.00033600256,0.00036337538,0.7813096,0.0034447506,0.19897972,0.013925287,0.00006403407],"about_ca_topic_score_codex":0.00086977676,"about_ca_topic_score_gemma":0.0018430733,"teacher_disagreement_score":0.0067121657,"about_ca_system_score_codex":0.00072571775,"about_ca_system_score_gemma":0.0006077034,"threshold_uncertainty_score":0.02245444},"labels":[],"label_agreement":null},{"id":"W2911347525","doi":"10.1109/tpwrs.2019.2897727","title":"A Review of Power System Flexibility With High Penetration of Renewables","year":2019,"lang":"en","type":"review","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":470,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Internet Registration Authority","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Risk analysis (engineering); Computer science; Volatility (finance); Reliability engineering; Environmental economics; Power (physics); Computer security; Business; Engineering; Economics; Electrical engineering; Finance","score_opus":0.02779842270905443,"score_gpt":0.2538902912757321,"score_spread":0.22609186856667768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911347525","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021073126,0.9958572,0.000500899,0.0003311195,0.0002749791,0.000005367767,0.00003575862,0.00000887353,0.0027750537],"genre_scores_gemma":[0.0017020908,0.9967866,0.0003613881,0.00016679616,0.00036443773,0.0000054940965,0.000046011948,0.0000025599923,0.00056473113],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965787,0.000055246368,0.00005895922,0.00007887757,0.00012548469,0.000023532542],"domain_scores_gemma":[0.9990557,0.0004996702,0.00013180793,0.000032810087,0.00024100175,0.000038935163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006466524,0.0009839648,0.0012051063,0.003283398,0.00033886847,0.0013864032,0.00087219424,0.001056003,0.0042169895],"category_scores_gemma":[0.0015167538,0.0004635378,0.0006059279,0.005953662,0.00046990972,0.0020464463,0.0006326248,0.0011775857,0.0017440277],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049564427,0.000060277842,0.00044878217,0.03227172,0.00011462848,0.000316272,0.00015503434,0.0017150774,0.0010442587,0.016188625,0.035430368,0.9122053],"study_design_scores_gemma":[0.000006102678,0.00008777684,0.0017636555,0.0077117025,0.00013517807,0.0011649805,0.00010508689,0.0002930891,0.00033805586,0.005251472,0.98310953,0.000033306645],"about_ca_topic_score_codex":0.001833531,"about_ca_topic_score_gemma":0.0020912546,"teacher_disagreement_score":0.0042169895,"about_ca_system_score_codex":0.0007392467,"about_ca_system_score_gemma":0.0015643381,"threshold_uncertainty_score":0.014107287},"labels":[],"label_agreement":null},{"id":"W2911523418","doi":"10.1109/mwscas.2018.8624108","title":"Is Economic Feasibility of BESS Energy Price Arbitrage Jurisdiction Dependent","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Profit (economics); Energy storage; Spot contract; Computer science; Microeconomics; Business; Environmental economics; Economics; Power (physics); Finance","score_opus":0.013378882666038485,"score_gpt":0.22632938157113067,"score_spread":0.21295049890509218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911523418","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8220988,0.00072380883,0.08027916,0.0025832723,0.0000914553,0.00009801639,0.00026924617,0.00011031635,0.09374597],"genre_scores_gemma":[0.99842525,0.00004390534,0.0006591277,0.000032916494,0.000012840556,0.000010545907,0.000015523921,0.000008527542,0.0007913958],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797064,0.0007546562,0.00006224175,0.00024980484,0.00050079735,0.00046185308],"domain_scores_gemma":[0.98659825,0.010391946,0.0012803236,0.00074143126,0.0007228139,0.0002651487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047493116,0.00024524436,0.0006764637,0.00047938107,0.0006631182,0.003063449,0.0008099812,0.0011039375,0.008614029],"category_scores_gemma":[0.017401345,0.0003742035,0.00061351457,0.00041865435,0.002167697,0.005108293,0.0011919667,0.0015027742,0.0003929053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017238586,0.00031771202,0.017109836,0.00019175834,0.00022748022,0.0013099357,0.0002140133,0.45465472,0.01393191,0.46717203,0.002991539,0.040155195],"study_design_scores_gemma":[0.0001674196,0.00049470004,0.016884,0.0000480504,0.000122353,0.0008143323,0.0008031801,0.73331594,0.008958242,0.23401812,0.004279058,0.000094530216],"about_ca_topic_score_codex":0.0010820781,"about_ca_topic_score_gemma":0.0008768979,"teacher_disagreement_score":0.008614029,"about_ca_system_score_codex":0.0013067325,"about_ca_system_score_gemma":0.001311393,"threshold_uncertainty_score":0.02881682},"labels":[],"label_agreement":null},{"id":"W2911905556","doi":"10.1109/tste.2019.2897288","title":"Demand Response Strategy Applied to Residential Electric Water Heaters Using Dynamic Programming and K-Means Clustering","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Cluster analysis; Demand response; Peak demand; Peaking power plant; Computer science; Silhouette; Consumption (sociology); Process (computing); Dynamic demand; Dynamic programming; Energy consumption; Cluster (spacecraft); Load management; Demand management; Hierarchical clustering; Control (management); Electricity; Power (physics); Engineering; Electric power system; Artificial intelligence; Electrical engineering; Algorithm","score_opus":0.004593137353370297,"score_gpt":0.1996663807054152,"score_spread":0.1950732433520449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911905556","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15714957,0.00013730666,0.83437485,0.00026520746,0.000034115285,0.00015250615,0.00004980687,0.0004991275,0.00733744],"genre_scores_gemma":[0.96709913,0.000042638167,0.030756993,0.000025407826,0.000006017003,0.00007335596,0.000031497995,0.000021578153,0.0019434216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997017,0.00008869898,0.0000151732465,0.00006643069,0.000073375166,0.000054666656],"domain_scores_gemma":[0.9996685,0.00014581156,0.000037324466,0.000013116196,0.000113678434,0.000021578187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048606706,0.0005307786,0.0006099342,0.00040192698,0.0005167107,0.0006721408,0.0007102191,0.00055889745,0.0012632693],"category_scores_gemma":[0.00076806673,0.00030313636,0.00045267816,0.00044802294,0.00028485534,0.0004305267,0.00045003215,0.0004243701,0.00017023107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008668567,0.000059460916,0.0005512332,0.000041703213,0.000017982402,0.000040515926,0.00007464324,0.9684516,0.0023022504,0.0014626285,0.00034857055,0.026562745],"study_design_scores_gemma":[0.000002102935,0.000014377683,0.00010099091,8.094202e-7,0.0000021784888,0.0000033227493,0.000014602498,0.99913967,0.00042224908,0.00020885728,0.00008804476,0.000002819744],"about_ca_topic_score_codex":0.014487804,"about_ca_topic_score_gemma":0.00953841,"teacher_disagreement_score":0.014487804,"about_ca_system_score_codex":0.0009234779,"about_ca_system_score_gemma":0.0006699242,"threshold_uncertainty_score":0.028806925},"labels":[],"label_agreement":null},{"id":"W2913739661","doi":"10.1016/j.apenergy.2019.01.091","title":"Peer-to-peer energy trading among smart homes","year":2019,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":250,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Renewable energy; Environmental economics; Energy storage; Pareto principle; Computer science; Business; Microeconomics; Economics; Operations management; Engineering; Electrical engineering","score_opus":0.00540038303934944,"score_gpt":0.17506579771738612,"score_spread":0.16966541467803667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913739661","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58972573,0.0014078702,0.36970758,0.001276518,0.00084005005,0.000552257,0.00035666936,0.002597691,0.033535656],"genre_scores_gemma":[0.98600614,0.00008992716,0.009531567,0.00005431415,0.00006854686,0.000026920346,0.0000820084,0.0000442614,0.0040963106],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998857,0.0003289926,0.00005683331,0.00027650714,0.00030368866,0.00017705302],"domain_scores_gemma":[0.99794644,0.0011073534,0.00012692649,0.00030764422,0.00033239505,0.00017924649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013031289,0.0005548529,0.0011851494,0.00040615373,0.001276604,0.0013867571,0.0017902538,0.0012803241,0.006992758],"category_scores_gemma":[0.0035854436,0.00037653287,0.00031784407,0.00071656454,0.0005709635,0.002542429,0.0019041246,0.00059355143,0.0013080868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038951905,0.0013711647,0.012720577,0.00053549063,0.00038376165,0.0036600549,0.0012828015,0.3371499,0.04493087,0.047337353,0.029788634,0.51694417],"study_design_scores_gemma":[0.000076841934,0.00023534699,0.0019268668,0.000016062659,0.000048273465,0.00044660005,0.00084242626,0.9459098,0.009249428,0.033591114,0.0076178256,0.00003947216],"about_ca_topic_score_codex":0.00095412746,"about_ca_topic_score_gemma":0.001893059,"teacher_disagreement_score":0.006992758,"about_ca_system_score_codex":0.00033431395,"about_ca_system_score_gemma":0.0005828897,"threshold_uncertainty_score":0.023393095},"labels":[],"label_agreement":null},{"id":"W2914984418","doi":"10.1049/iet-stg.2018.0033","title":"New real‐time demand‐side management approach for energy management systems","year":2019,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Energy management system; Energy management; Computer science; Microgrid; Controller (irrigation); Demand side; Control (management); Real-time computing; Energy (signal processing)","score_opus":0.005974474092871992,"score_gpt":0.17829602310520315,"score_spread":0.17232154901233115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914984418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007159262,0.0002928561,0.987576,0.00011061358,0.00005705031,0.000034408808,0.000046167715,0.0003143491,0.0044092336],"genre_scores_gemma":[0.7420046,0.00055032683,0.25048894,0.00011837379,0.00014406948,0.000114288225,0.00023182586,0.00010065894,0.0062469244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964285,0.00010733726,0.000019438075,0.000055695615,0.00014855224,0.000026114865],"domain_scores_gemma":[0.99983907,0.000054827626,0.000022820053,0.000033354238,0.000040723025,0.000009142757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035583426,0.00056989485,0.00048138323,0.00029938362,0.00023660433,0.0008368339,0.0007517898,0.00036058694,0.002835741],"category_scores_gemma":[0.0004483436,0.00022419222,0.0003470456,0.00043563452,0.00022642424,0.00094841985,0.0004873596,0.00064705993,0.0005678794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020682054,0.00020607347,0.000611015,0.00042339799,0.000084486135,0.00022086254,0.00020601148,0.6032841,0.03035498,0.04568548,0.0046612197,0.31405553],"study_design_scores_gemma":[0.000009219319,0.000039022667,0.00010920616,0.0000059300983,0.0000065158715,0.00004048504,0.000015189583,0.9906384,0.0015366405,0.0039840247,0.0036086817,0.0000065335057],"about_ca_topic_score_codex":0.0010770899,"about_ca_topic_score_gemma":0.0016044137,"teacher_disagreement_score":0.002835741,"about_ca_system_score_codex":0.0003445075,"about_ca_system_score_gemma":0.00039511707,"threshold_uncertainty_score":0.009486556},"labels":[],"label_agreement":null},{"id":"W2915843629","doi":"10.1109/mpe.2018.2884112","title":"Distributed Generation and Megacities: Are Renewables the Answer?","year":2019,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Renewable energy; Distributed generation; Electricity generation; Electricity; Electricity retailing; Stand-alone power system; Environmental economics; Electric power transmission; Mains electricity; Engineering; Electricity market; Computer science; Electrical engineering; Voltage; Power (physics); Economics","score_opus":0.006712175807085511,"score_gpt":0.17357989777663482,"score_spread":0.1668677219695493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915843629","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031933754,0.3871286,0.0030214281,0.5589918,0.009333305,0.0000075451353,0.00027323,0.00007073862,0.037979916],"genre_scores_gemma":[0.16556272,0.7006809,0.0016346088,0.0803789,0.03231172,0.000033048076,0.00029542638,0.0001098601,0.018992808],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99925786,0.0002500598,0.00002272962,0.0001110416,0.00025970855,0.000098631324],"domain_scores_gemma":[0.9960316,0.0025203333,0.0002862696,0.00016489782,0.000714623,0.00028217136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014503476,0.0005009374,0.000820679,0.0010747827,0.001067317,0.0042090896,0.0007279914,0.0046460866,0.01698809],"category_scores_gemma":[0.00851235,0.00022189064,0.00033581143,0.0023870207,0.0041072527,0.01293224,0.0017716856,0.005892395,0.0026469799],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010843222,0.000052938154,0.0019846368,0.0010135628,0.00006643175,0.0002540983,0.00047444884,0.0011887454,0.00019442105,0.51197106,0.25789842,0.22479287],"study_design_scores_gemma":[0.000019462595,0.000027757618,0.001767241,0.0013750469,0.000024974077,0.00024250797,0.0013818993,0.00047867533,0.0001284474,0.4572741,0.5372444,0.000035533187],"about_ca_topic_score_codex":0.004067143,"about_ca_topic_score_gemma":0.0041852575,"teacher_disagreement_score":0.01698809,"about_ca_system_score_codex":0.0018947943,"about_ca_system_score_gemma":0.0012723616,"threshold_uncertainty_score":0.056830823},"labels":[],"label_agreement":null},{"id":"W2916201513","doi":"","title":"SCADA system for remote control and monitoring of grid connected inverters","year":2018,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"SCADA; Grid; Supervisory control; Engineering; Renewable energy; Control engineering; Reliability engineering; Real-time computing; Computer science; Embedded system; Control (management); Electrical engineering","score_opus":0.01682874924162081,"score_gpt":0.22847590256733738,"score_spread":0.21164715332571657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2916201513","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040453423,0.0019137936,0.8240665,0.0005398669,0.0008536825,0.0009951458,0.0031260198,0.072383255,0.055668306],"genre_scores_gemma":[0.7449934,0.0019692136,0.18308367,0.00036185546,0.00048039202,0.0013704555,0.006879543,0.0013754768,0.059485964],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876994,0.00021186606,0.000097690594,0.00023929829,0.0006034524,0.000077827295],"domain_scores_gemma":[0.9988696,0.00012562692,0.00011277535,0.00019356683,0.00064535014,0.000052990898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071850244,0.0008293714,0.00075812294,0.0015949103,0.0007134876,0.0011744704,0.0010290551,0.00051675475,0.008495155],"category_scores_gemma":[0.0016719056,0.00026197117,0.0002914709,0.0012100847,0.00030725554,0.0007741631,0.00051542016,0.00095710607,0.0054657976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007104013,0.00029360884,0.009956506,0.0009084148,0.0001743802,0.00086982764,0.0010022396,0.03197325,0.07643981,0.021412967,0.10085402,0.7554046],"study_design_scores_gemma":[0.00034707115,0.0008498618,0.011929857,0.0003056605,0.00019256902,0.0011534303,0.00020829422,0.32339886,0.08122636,0.006212723,0.57399863,0.00017662333],"about_ca_topic_score_codex":0.0033407153,"about_ca_topic_score_gemma":0.0024815707,"teacher_disagreement_score":0.008495155,"about_ca_system_score_codex":0.00067579944,"about_ca_system_score_gemma":0.0008339961,"threshold_uncertainty_score":0.028419137},"labels":[],"label_agreement":null},{"id":"W2917956205","doi":"10.1109/icassp.2019.8682543","title":"Wavenilm: A Causal Neural Network for Power Disaggregation from the Complex Power Signal","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power (physics); Convergence (economics); Convolutional neural network; Aggregate (composite); Artificial neural network; SIGNAL (programming language); AC power; Artificial intelligence; Machine learning; Data mining","score_opus":0.021900797175961086,"score_gpt":0.22496269030008248,"score_spread":0.2030618931241214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2917956205","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.115696795,0.0020006467,0.82689977,0.001119736,0.0005049034,0.00018204,0.017002609,0.028724337,0.007869092],"genre_scores_gemma":[0.6455176,0.00091884664,0.30554032,0.00047447262,0.00017231784,0.00025665024,0.03344258,0.00072503014,0.0129521685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986434,0.000022792747,0.0000074137356,0.000044664095,0.000037560614,0.000023266733],"domain_scores_gemma":[0.9997929,0.00007413111,0.000027947279,0.000056188106,0.000036251557,0.000012682264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003697022,0.0012132204,0.00044275902,0.0008524529,0.00027878082,0.00062042766,0.0012217752,0.0008440937,0.0033304715],"category_scores_gemma":[0.0015244111,0.00037927536,0.00047070955,0.0010584404,0.00024230954,0.00088939583,0.00078734406,0.0013312135,0.00088240206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029117177,0.00025877467,0.0054788035,0.00024294521,0.00021216941,0.0002285838,0.000058390342,0.59036964,0.0056587146,0.005069999,0.03577335,0.35635749],"study_design_scores_gemma":[0.000011256978,0.000014063173,0.000667524,0.000006471728,0.0000073341425,0.000016571921,0.000005437925,0.99353164,0.0015900596,0.0019297313,0.002212739,0.0000071463005],"about_ca_topic_score_codex":0.014475295,"about_ca_topic_score_gemma":0.030266108,"teacher_disagreement_score":0.014475295,"about_ca_system_score_codex":0.0007562465,"about_ca_system_score_gemma":0.0007811353,"threshold_uncertainty_score":0.02878207},"labels":[],"label_agreement":null},{"id":"W2918273042","doi":"10.1109/globalsip.2018.8646530","title":"Distributed Assimilation of Grid Conditions and Load Integration via Social Learning","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Grid; Computer science; Distributed computing; Smart grid; Grid computing; Distributed learning; Engineering; Electrical engineering","score_opus":0.00762672080430753,"score_gpt":0.21607837543540398,"score_spread":0.20845165463109644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918273042","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5128482,0.00020889936,0.47308975,0.0018469347,0.000085821535,0.00011905644,0.00013305972,0.00037760971,0.011290668],"genre_scores_gemma":[0.9941434,0.00003390285,0.005090499,0.000045334808,0.00001989948,0.000018224811,0.000027748365,0.000008621724,0.0006122969],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993432,0.00025694113,0.000026990483,0.00017022368,0.00011313051,0.00008943192],"domain_scores_gemma":[0.99639744,0.002301125,0.0006166346,0.000275906,0.00026133267,0.00014760271],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016894935,0.00050237786,0.00057106715,0.0007117952,0.00060737476,0.0015509607,0.0009242314,0.00088365277,0.001256806],"category_scores_gemma":[0.007837179,0.00033312407,0.00048332612,0.0005088673,0.0010987128,0.0019342426,0.0015851166,0.0011417118,0.00018810567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014186639,0.00019628319,0.015946059,0.00005001783,0.0001575218,0.00019648077,0.0005669068,0.9168001,0.0024332325,0.019457726,0.0009627623,0.043091018],"study_design_scores_gemma":[0.000007283893,0.000019534766,0.00116526,0.0000028839347,0.000007649924,0.000009333565,0.000059325397,0.98831046,0.00021536424,0.010003245,0.00019167758,0.0000079562105],"about_ca_topic_score_codex":0.006966068,"about_ca_topic_score_gemma":0.0062764953,"teacher_disagreement_score":0.006966068,"about_ca_system_score_codex":0.0010663337,"about_ca_system_score_gemma":0.00072558667,"threshold_uncertainty_score":0.013850987},"labels":[],"label_agreement":null},{"id":"W2919708585","doi":"10.1016/j.energy.2019.116138","title":"A general framework for customized transition to smart homes","year":2019,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Consumption (sociology); Investment (military); Electricity; Work (physics); Home automation; Profit (economics); Context (archaeology); Environmental economics; Payback period; Return on investment; Business; Computer science; Engineering; Economics; Microeconomics; Production (economics); Telecommunications; Geography","score_opus":0.005487191187511561,"score_gpt":0.20127713713458587,"score_spread":0.1957899459470743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2919708585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018558548,0.00008003996,0.9760331,0.00031658137,0.00010968518,0.00029614603,0.00040330226,0.0073076673,0.013597751],"genre_scores_gemma":[0.15672465,0.00048585617,0.8102424,0.00046247357,0.00011655699,0.0008070283,0.001968624,0.0018104615,0.0273819],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985996,0.00025728773,0.00012848343,0.0002837497,0.0004608278,0.00027007968],"domain_scores_gemma":[0.99922216,0.000154541,0.000039569266,0.00030418,0.00018841757,0.00009113989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001750501,0.00093565637,0.00078369636,0.000992365,0.0012584913,0.004941958,0.0029800027,0.002054114,0.02422442],"category_scores_gemma":[0.0031725152,0.0006458686,0.0019560384,0.0010391363,0.0012077441,0.0049825814,0.0044913962,0.0026662329,0.0075898515],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020176268,0.00024093817,0.0015112392,0.0003242255,0.000085694766,0.00080101984,0.0007911149,0.06363824,0.0053247465,0.7606704,0.03736516,0.12904537],"study_design_scores_gemma":[0.00008344392,0.000082169136,0.00048114374,0.00019531393,0.0000796788,0.00055794284,0.00040916528,0.45424527,0.007649738,0.30044806,0.23567843,0.00008962408],"about_ca_topic_score_codex":0.007829827,"about_ca_topic_score_gemma":0.010509021,"teacher_disagreement_score":0.02422442,"about_ca_system_score_codex":0.0011740928,"about_ca_system_score_gemma":0.002106585,"threshold_uncertainty_score":0.08103877},"labels":[],"label_agreement":null},{"id":"W2920242169","doi":"10.1088/1755-1315/238/1/012051","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2019,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Computer science; Energy storage; Smart grid; Environmental science; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.005201973265721117,"score_gpt":0.15379829534167694,"score_spread":0.14859632207595583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920242169","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68578213,0.0001616075,0.29376096,0.00027531656,0.000049909213,0.00016105393,0.000100958605,0.0008826432,0.018825458],"genre_scores_gemma":[0.9931879,0.00002305924,0.0047408035,0.000011478029,0.0000032493426,0.000024744451,0.000014873916,0.000005742198,0.001988301],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976486,0.000074970805,0.000010193641,0.000056339188,0.00006142103,0.000032158063],"domain_scores_gemma":[0.99971956,0.00008556779,0.000041822852,0.000028438899,0.00008633683,0.00003828829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032067107,0.00037943517,0.00038021625,0.00018090403,0.0006513179,0.00082723016,0.00079000107,0.00032460262,0.0018241943],"category_scores_gemma":[0.00048171217,0.0002126206,0.000286407,0.00021367006,0.00039341394,0.0005114002,0.00088473066,0.0003748183,0.00020001917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039633096,0.00030684494,0.002342244,0.00007295181,0.000059753136,0.00041341956,0.00025132863,0.9324151,0.023335392,0.0028776221,0.00068733055,0.036841616],"study_design_scores_gemma":[0.000021950565,0.00009286804,0.00036592304,0.0000020827683,0.000011543574,0.000029138906,0.000046345296,0.9966158,0.0018590762,0.0004846604,0.0004650029,0.0000056102012],"about_ca_topic_score_codex":0.014778705,"about_ca_topic_score_gemma":0.019460654,"teacher_disagreement_score":0.014778705,"about_ca_system_score_codex":0.0005772774,"about_ca_system_score_gemma":0.0005835192,"threshold_uncertainty_score":0.029385388},"labels":[],"label_agreement":null},{"id":"W2921952589","doi":"10.22109/jemt.2019.119235.1064","title":"Robust Energy Management of a Microgrid with Uncertain Price, Renewable Generation, and Load using Taguchi’s Orthogonal Array Method","year":2019,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Microgrid; Renewable energy; Taguchi methods; Mathematical optimization; Robust optimization; Orthogonal array; Monte Carlo method; Computer science; Energy management; Reliability engineering; Energy (signal processing); Engineering; Mathematics; Statistics; Electrical engineering","score_opus":0.010841688308818301,"score_gpt":0.19922914772999809,"score_spread":0.1883874594211798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921952589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044066537,0.00015226107,0.953152,0.00006288004,0.000020263797,0.000049061244,0.000023695071,0.00014987748,0.0023234088],"genre_scores_gemma":[0.91965485,0.00017437023,0.078579575,0.00002889845,0.000012413254,0.00012911356,0.000029222088,0.000021625245,0.0013699998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996443,0.00013680231,0.000019227022,0.000059089853,0.00010566686,0.000034893386],"domain_scores_gemma":[0.99976546,0.00010827228,0.000053116783,0.000015647,0.000049799055,0.0000076929255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078264484,0.00078882417,0.00067823636,0.0003268353,0.000358592,0.0008281944,0.0004969621,0.0005331371,0.0008022246],"category_scores_gemma":[0.0007883549,0.0003573716,0.0007707862,0.00039391415,0.0004070701,0.0005192182,0.0004356125,0.0004104952,0.000098784476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032508404,0.000020566244,0.0002482991,0.00004064535,0.000025821495,0.000049245176,0.000029289125,0.978871,0.0051372456,0.0015855742,0.00008351672,0.013876386],"study_design_scores_gemma":[0.0000021452768,0.000028287654,0.000047179798,0.000001585274,0.0000064007418,0.0000053312306,0.0000057192974,0.99886227,0.00064753153,0.00032313605,0.00006709535,0.0000033503873],"about_ca_topic_score_codex":0.0029828388,"about_ca_topic_score_gemma":0.0024488939,"teacher_disagreement_score":0.0029828388,"about_ca_system_score_codex":0.00048752566,"about_ca_system_score_gemma":0.0006424669,"threshold_uncertainty_score":0.0059309006},"labels":[],"label_agreement":null},{"id":"W2922529414","doi":"10.1007/s40565-019-0510-0","title":"Enhancing scalability of peer-to-peer energy markets using adaptive segmentation method","year":2019,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Market segmentation; Scalability; Computer science; Cluster analysis; Peer-to-peer; Novelty; Market clearing; Clearing; Segmentation; Energy market; Distributed computing; Artificial intelligence; Business; Economics; Microeconomics; Marketing; Engineering","score_opus":0.01051726490520023,"score_gpt":0.23468933896600636,"score_spread":0.22417207406080614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922529414","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06457918,0.00044839917,0.9281099,0.00025781663,0.000079252066,0.0001592793,0.00004391143,0.00085512525,0.005467037],"genre_scores_gemma":[0.884016,0.00016388127,0.11318951,0.00008400536,0.000055987075,0.00012150651,0.00007211343,0.00007075911,0.0022262307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911755,0.00025130986,0.00004494262,0.00018892626,0.00027296002,0.0001242747],"domain_scores_gemma":[0.99867886,0.00063953357,0.00011480062,0.0001556721,0.00029995138,0.00011117142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011758937,0.0005290209,0.0009537643,0.00062463694,0.00094547577,0.0010155254,0.0017070278,0.0008794365,0.0024456216],"category_scores_gemma":[0.0032568767,0.00027833012,0.0004253385,0.00069516915,0.0006805913,0.0025508432,0.0014384682,0.0007297564,0.00039735626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006359476,0.0003727596,0.0025878716,0.00024007852,0.00012816093,0.000577911,0.0005916281,0.60147625,0.053011537,0.05929803,0.0063825864,0.27469724],"study_design_scores_gemma":[0.000027413926,0.000046114787,0.00018235951,0.0000029346256,0.00000870201,0.00005922577,0.00004288769,0.9895824,0.0021329243,0.0066629094,0.0012415369,0.000010475517],"about_ca_topic_score_codex":0.002149876,"about_ca_topic_score_gemma":0.0020535053,"teacher_disagreement_score":0.0024456216,"about_ca_system_score_codex":0.0006540973,"about_ca_system_score_gemma":0.00088699994,"threshold_uncertainty_score":0.008181393},"labels":[],"label_agreement":null},{"id":"W2924826474","doi":"10.1109/tsg.2019.2906823","title":"Hierarchical and Decentralized Stochastic Energy Management for Smart Distribution Systems With High BESS Penetration","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Energy management; Mathematical optimization; Markov decision process; Computer science; Energy management system; Partially observable Markov decision process; Markov process; Smart grid; Computational complexity theory; Markov chain; Engineering; Markov model; Energy (signal processing); Mathematics; Electrical engineering; Algorithm","score_opus":0.005864645785266788,"score_gpt":0.1854539649386169,"score_spread":0.1795893191533501,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924826474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04510177,0.00017420223,0.9514351,0.00014005674,0.000028917122,0.000059308564,0.00005847288,0.00034028065,0.0026618713],"genre_scores_gemma":[0.97171766,0.000076383076,0.02721389,0.00003244108,0.000022367838,0.000033626395,0.00005037277,0.000011518951,0.00084180397],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957794,0.00009436901,0.000027258842,0.00010091416,0.00012239715,0.000077086625],"domain_scores_gemma":[0.99963105,0.000119723925,0.000084719926,0.000050618935,0.00008582352,0.000028061459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004559822,0.0004887338,0.00059811014,0.00019093638,0.0004990991,0.000557334,0.0007761998,0.00033631784,0.0015508557],"category_scores_gemma":[0.000703961,0.00022469921,0.00036536442,0.00028581888,0.00033943105,0.0007221685,0.0006077399,0.0004918923,0.0001783866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008541807,0.00007054101,0.000799935,0.00008289875,0.00003243072,0.00013529822,0.00006819631,0.9275946,0.0082044955,0.015540491,0.0011985147,0.046187166],"study_design_scores_gemma":[0.000008123904,0.000024851583,0.00019166702,0.0000020184154,0.00000508765,0.000019302819,0.000008564398,0.9964259,0.0005081773,0.0024657412,0.00033661953,0.000003926965],"about_ca_topic_score_codex":0.0037434583,"about_ca_topic_score_gemma":0.0069982396,"teacher_disagreement_score":0.0037434583,"about_ca_system_score_codex":0.00059744925,"about_ca_system_score_gemma":0.00085831695,"threshold_uncertainty_score":0.0074433684},"labels":[],"label_agreement":null},{"id":"W2926367482","doi":"10.1049/iet-gtd.2018.6751","title":"Generation maintenance scheduling in virtual power plants","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Reliability engineering; Electric power system; Scheduling (production processes); Computer science; Renewable energy; Grid; Wind power; Virtual power plant; Distributed generation; Engineering; Power (physics); Electrical engineering; Operations management","score_opus":0.01351030306966918,"score_gpt":0.2110844420116391,"score_spread":0.1975741389419699,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2926367482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40280533,0.00031513657,0.5916794,0.0002030656,0.00007239976,0.00006945512,0.000099750374,0.00025533768,0.0045001255],"genre_scores_gemma":[0.99396354,0.000025249765,0.0055980124,0.000008592955,0.000004760516,0.000008612308,0.000013292729,0.000006169502,0.0003718632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958354,0.00017199357,0.000017780838,0.000085306354,0.00005686049,0.00008455069],"domain_scores_gemma":[0.9990614,0.00041530424,0.00022325055,0.00007945242,0.00010827345,0.00011229363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008399921,0.00038326124,0.00049595605,0.0002716398,0.00036534108,0.00079696305,0.00083420746,0.00053134427,0.001436144],"category_scores_gemma":[0.0017670939,0.00025825843,0.00029382322,0.00030642067,0.00052066165,0.00073731726,0.0005927512,0.00045911156,0.00011108683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001351112,0.000025609039,0.000479988,0.000019079544,0.000015917765,0.000099970996,0.000031221993,0.98314166,0.0013640231,0.0050168335,0.00027541976,0.009395187],"study_design_scores_gemma":[0.000012034346,0.000054280386,0.0001711593,0.0000016210834,0.000004400405,0.000019599356,0.000010875476,0.9975889,0.00026362462,0.0017315177,0.0001392831,0.0000027318358],"about_ca_topic_score_codex":0.003468394,"about_ca_topic_score_gemma":0.0023254235,"teacher_disagreement_score":0.003468394,"about_ca_system_score_codex":0.00076262705,"about_ca_system_score_gemma":0.0006117947,"threshold_uncertainty_score":0.006896436},"labels":[],"label_agreement":null},{"id":"W2927980047","doi":"10.1049/iet-gtd.2018.6413","title":"Enabling electricity access: a comprehensive energy efficient approach mitigating climate/weather variability – Part II","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Environmental economics; Computer science; Probabilistic logic; National Grid; Mains electricity; Electricity generation; Population; Operations research; Power (physics); Engineering; Economics; Geography; Electrical engineering","score_opus":0.015154523473485077,"score_gpt":0.21851692153173163,"score_spread":0.20336239805824655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2927980047","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03581053,0.00064590026,0.9504906,0.00052230555,0.000053404696,0.0001162315,0.00022737283,0.00035224488,0.01178131],"genre_scores_gemma":[0.899887,0.0006767585,0.0948643,0.000101361264,0.00006641655,0.00016823421,0.00024992303,0.000073963114,0.0039121485],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997378,0.00007105039,0.0000075423104,0.00004949315,0.00006886585,0.00006527665],"domain_scores_gemma":[0.9998293,0.00008383095,0.000025644158,0.000014644747,0.00002543142,0.000021149059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000479798,0.0008829335,0.00085172907,0.00048771114,0.0003078323,0.0013107999,0.00069852755,0.0009789803,0.0033987549],"category_scores_gemma":[0.0007130733,0.00054497865,0.00087453896,0.0005928032,0.00037178947,0.0010042221,0.0011518938,0.00064927206,0.00025392315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010023008,0.000016108877,0.00024226,0.000023107406,0.000015735055,0.000032539712,0.0000097027905,0.984666,0.0006426013,0.0029020477,0.00039607947,0.011043699],"study_design_scores_gemma":[0.0000027255526,0.000012957046,0.00015138135,0.000004128442,0.000005198756,0.00000793276,0.000008458233,0.9972308,0.00014313796,0.0020184948,0.00041193355,0.0000029315574],"about_ca_topic_score_codex":0.0065696435,"about_ca_topic_score_gemma":0.007975833,"teacher_disagreement_score":0.0065696435,"about_ca_system_score_codex":0.0006423401,"about_ca_system_score_gemma":0.0016096714,"threshold_uncertainty_score":0.013062835},"labels":[],"label_agreement":null},{"id":"W2932392300","doi":"10.1049/iet-gtd.2018.5556","title":"Enabling electricity access: revisiting load models for AC‐grid operation ‐ Part I","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Economic shortage; Environmental economics; Electricity demand; Computer science; Stand-alone power system; Mains electricity; Electricity generation; Electricity retailing; Peak demand; Demand response; Work (physics); Load management; National Grid; Probabilistic logic; Electricity market; Distributed generation; Power (physics); Renewable energy; Electrical engineering; Engineering; Economics","score_opus":0.027659245967337605,"score_gpt":0.24533256848436005,"score_spread":0.21767332251702246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2932392300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03166438,0.000582769,0.94688475,0.001025097,0.00015863412,0.000089781846,0.00031125473,0.00042924777,0.018854091],"genre_scores_gemma":[0.93967116,0.0011203254,0.048036102,0.00019855761,0.0002141611,0.00013116898,0.00036741883,0.0002301034,0.010030984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958247,0.00019035135,0.00002040734,0.000064418404,0.00010253498,0.000039900344],"domain_scores_gemma":[0.99909616,0.0005397418,0.00008545069,0.000099591954,0.00014498492,0.000034238557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007032057,0.00071740703,0.0006628418,0.0003005814,0.0004014349,0.0018488757,0.001441831,0.0008995947,0.0048026023],"category_scores_gemma":[0.0026206993,0.00042718856,0.0007563085,0.0005828553,0.0006312748,0.0023877125,0.0009252936,0.0016384756,0.0006718981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017219005,0.000032702177,0.00046136312,0.00003674554,0.000013570552,0.00004054739,0.000044009703,0.9688737,0.00044678868,0.019228064,0.0010690239,0.009736243],"study_design_scores_gemma":[0.0000016154139,0.0000056848253,0.000052068954,0.000004716771,0.0000024509684,0.000004065537,0.0000080635855,0.9944528,0.000055144927,0.0047044195,0.0007067718,0.0000022089334],"about_ca_topic_score_codex":0.013292143,"about_ca_topic_score_gemma":0.011301136,"teacher_disagreement_score":0.013292143,"about_ca_system_score_codex":0.0009165538,"about_ca_system_score_gemma":0.0010390788,"threshold_uncertainty_score":0.026429534},"labels":[],"label_agreement":null},{"id":"W2935765054","doi":"10.1049/iet-esi.2019.0019","title":"Assessing the potential of surplus clean power in reducing GHG emissions in the building sector using game theory; a case study of Ontario, Canada","year":2019,"lang":"en","type":"article","venue":"IET Energy Systems Integration","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Electricity; Greenhouse gas; Natural gas; Environmental economics; Natural gas prices; Boiler (water heating); Electricity generation; Mains electricity; Waste management; Business; Economics; Natural resource economics; Environmental science; Engineering; Power (physics); Electrical engineering","score_opus":0.0129715920942182,"score_gpt":0.23716918825654026,"score_spread":0.22419759616232207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935765054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96234405,0.0002485123,0.004004903,0.00044522271,0.000008879153,0.0002988907,0.0004742047,0.000041964417,0.032133408],"genre_scores_gemma":[0.9897176,0.00024289961,0.0030607341,0.00003199934,0.0000015791087,0.000037204343,0.00011493565,0.000011573457,0.0067815697],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918944,0.00023414099,0.000014968047,0.00006025402,0.00020962379,0.00029149043],"domain_scores_gemma":[0.99910283,0.00041437073,0.000055840028,0.00003746042,0.00026834672,0.00012112708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082932407,0.00057065417,0.0003292955,0.0007918106,0.0028980344,0.0017612266,0.0010933423,0.0009188719,0.0024073573],"category_scores_gemma":[0.0015937786,0.00027551883,0.0006015277,0.0013067169,0.001500067,0.0007096403,0.0005497042,0.0004839969,0.0001286056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014140717,0.0012932671,0.08036311,0.0008217097,0.0002556477,0.006609291,0.005028952,0.7698407,0.016622731,0.05243847,0.007588376,0.057723638],"study_design_scores_gemma":[0.0005886539,0.0012512325,0.0985135,0.00015360487,0.00028213338,0.00048053992,0.030033804,0.8033004,0.01304935,0.008379746,0.043703374,0.00026374412],"about_ca_topic_score_codex":0.98124456,"about_ca_topic_score_gemma":0.990638,"teacher_disagreement_score":0.044854134,"about_ca_system_score_codex":0.044854134,"about_ca_system_score_gemma":0.025114777,"threshold_uncertainty_score":0.32544106},"labels":[],"label_agreement":null},{"id":"W2936186753","doi":"10.1016/j.jare.2019.04.001","title":"Optimization unit for real-time applications in unbalanced smart distribution networks","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scalability; Robustness (evolution); Smart grid; Mathematical optimization; Reduction (mathematics); Computational complexity theory; Jacobian matrix and determinant; Optimization problem; Energy management; Distributed generation; Electric power system; Distributed computing; Real-time computing; Power (physics); Energy (signal processing); Algorithm; Mathematics; Engineering","score_opus":0.01633372463482647,"score_gpt":0.3036934064947747,"score_spread":0.28735968185994826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936186753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012257394,0.00003706638,0.99657625,0.00004237137,0.00003718496,0.00002431042,0.000021457226,0.0003010631,0.001734539],"genre_scores_gemma":[0.2065045,0.0003110461,0.78486097,0.000112880996,0.0001510993,0.0002678317,0.00024402696,0.0005209708,0.0070267166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996517,0.000099821285,0.000021166445,0.000047488895,0.00015589822,0.000023969838],"domain_scores_gemma":[0.9996842,0.000106071515,0.00004617216,0.000053730953,0.00009273046,0.000017133758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005609644,0.0010424054,0.0006487964,0.00039056793,0.00037509087,0.00071463117,0.0008587771,0.00050318014,0.0060523017],"category_scores_gemma":[0.00112199,0.00027849362,0.00044197575,0.00038655283,0.00042366478,0.0009793964,0.0006947407,0.0010696715,0.0017263432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008163613,0.00010633557,0.0004421633,0.0003128202,0.000041485357,0.00021314842,0.000102267,0.7142644,0.023315974,0.06744499,0.007025552,0.1866493],"study_design_scores_gemma":[0.0000087682565,0.000032752225,0.00007923896,0.0000073424985,0.000005678249,0.00004012412,0.000010181585,0.98723096,0.0026656766,0.003899786,0.006012033,0.000007477519],"about_ca_topic_score_codex":0.0017982338,"about_ca_topic_score_gemma":0.002905729,"teacher_disagreement_score":0.0060523017,"about_ca_system_score_codex":0.000405753,"about_ca_system_score_gemma":0.0009579559,"threshold_uncertainty_score":0.020246983},"labels":[],"label_agreement":null},{"id":"W2941562081","doi":"10.1109/tii.2019.2912816","title":"A Heuristic-Based Appliance Scheduling Scheme for Smart Homes","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Council of Scientific and Industrial Research, India","keywords":"Smart grid; Scheduling (production processes); Computer science; Heuristic; Demand response; Electricity; Grid; Load management; Electric power system; Distributed computing; Scheme (mathematics); Job shop scheduling; Real-time computing; Power (physics); Mathematical optimization; Engineering; Embedded system; Electrical engineering","score_opus":0.029150851589329552,"score_gpt":0.22572639798112357,"score_spread":0.196575546391794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941562081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13211259,0.00039994647,0.85994923,0.0001739887,0.000101559235,0.00017771532,0.00012727757,0.0010783334,0.0058793006],"genre_scores_gemma":[0.88586074,0.00010174531,0.112445325,0.000054454526,0.00003100217,0.00008427408,0.00012266416,0.000031391166,0.0012684019],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999728,0.00008759588,0.000014848054,0.000048202204,0.00006330909,0.000057972262],"domain_scores_gemma":[0.99971086,0.000098154946,0.00006115166,0.000035682955,0.000057698355,0.000036473804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045656328,0.00042094142,0.00056843803,0.00042610368,0.00045930632,0.00047312945,0.00072707067,0.0003858809,0.0015594809],"category_scores_gemma":[0.0006631511,0.0001987303,0.00026020876,0.00057051063,0.00026523712,0.00047578535,0.00031340873,0.00029438568,0.00020502644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004025499,0.00024639224,0.0010379527,0.00010795682,0.000054598364,0.00014213125,0.00010955529,0.83669895,0.01317588,0.00958525,0.0039727846,0.13446599],"study_design_scores_gemma":[0.000026944046,0.000057378867,0.00018206642,0.0000023314271,0.000007165915,0.00002919256,0.000021021802,0.99645907,0.0011699112,0.0013289908,0.0007088545,0.0000070907013],"about_ca_topic_score_codex":0.004074369,"about_ca_topic_score_gemma":0.006440338,"teacher_disagreement_score":0.004074369,"about_ca_system_score_codex":0.00064565724,"about_ca_system_score_gemma":0.00095385296,"threshold_uncertainty_score":0.0081012845},"labels":[],"label_agreement":null},{"id":"W2942340619","doi":"","title":"Technical-economic feasibility and simulation of ÉTS' electricity saving with photovoltaic system and batteries","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Incentive; Electricity; Demand response; Incentive program; Environmental economics; Business; Finance; Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.007448637060206308,"score_gpt":0.19564866860422017,"score_spread":0.18820003154401385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942340619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9006324,0.00020101466,0.0130236205,0.0009692234,0.000077781195,0.00020573783,0.003760281,0.00018412572,0.080945976],"genre_scores_gemma":[0.9879952,0.00010686074,0.0033526828,0.000042037907,0.0000063838525,0.00008112669,0.00088981097,0.000020581227,0.0075052464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996923,0.00008351538,0.000007848735,0.000031216015,0.000067671004,0.000117378506],"domain_scores_gemma":[0.9989882,0.00052083255,0.00006813832,0.0000346074,0.0003021955,0.00008596881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005873361,0.0005270512,0.0004596366,0.00041924167,0.0006284033,0.000927616,0.00091495324,0.00093746517,0.0071450314],"category_scores_gemma":[0.001670026,0.0002976782,0.0007560426,0.0006595477,0.0004416283,0.00058207667,0.00040331754,0.0006370992,0.00033837356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006807921,0.000032495547,0.0022113235,0.00002466818,0.000008218732,0.00007345493,0.000015375905,0.99303436,0.00028286132,0.0018852899,0.00096173526,0.0014021085],"study_design_scores_gemma":[0.00004160753,0.000065703876,0.0018998691,0.000009679048,0.000012686992,0.0000144576115,0.00011926154,0.99537164,0.00042065888,0.0005009383,0.00153397,0.0000095485],"about_ca_topic_score_codex":0.37611288,"about_ca_topic_score_gemma":0.31725603,"teacher_disagreement_score":0.37611288,"about_ca_system_score_codex":0.004986524,"about_ca_system_score_gemma":0.003720572,"threshold_uncertainty_score":0.7478473},"labels":[],"label_agreement":null},{"id":"W2942833824","doi":"","title":"Joint Optimal Design and Operation of Hybrid Energy Storage Systems","year":2016,"lang":"en","type":"article","venue":"EUR Research Repository (Erasmus University Rotterdam)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sizing; Energy storage; Computer science; Computer data storage; Grid; Computer hardware; Power (physics); Mathematics","score_opus":0.02977020262509768,"score_gpt":0.20909277716851044,"score_spread":0.17932257454341274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942833824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22381602,0.00081519276,0.74793994,0.000588232,0.00006984715,0.00027373416,0.00029181398,0.00032015282,0.025885008],"genre_scores_gemma":[0.98021096,0.0001551045,0.017081866,0.00002942102,0.000009626062,0.00016040623,0.00004832325,0.000022168622,0.0022821338],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992974,0.00027866237,0.00004034077,0.00012097206,0.00015113562,0.00011144596],"domain_scores_gemma":[0.99914944,0.0004685918,0.00013254589,0.000041378586,0.00014351885,0.00006445716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014151394,0.00079438894,0.0012519945,0.000608173,0.00044215634,0.0020382234,0.0007188911,0.0009994773,0.0023778183],"category_scores_gemma":[0.0020831611,0.0007834522,0.00063373335,0.0005141797,0.0011656783,0.0011593314,0.0016294493,0.0006278463,0.00023785289],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000062524494,0.000017122222,0.00021399237,0.000037754686,0.000019398909,0.000039496972,0.000023660054,0.9914069,0.0011170539,0.0033901257,0.00012772769,0.0035442442],"study_design_scores_gemma":[0.000018348877,0.00005319231,0.00011707237,0.000005314903,0.00000885684,0.0000072669877,0.000022343396,0.9958819,0.0005043719,0.0031188617,0.00025627718,0.0000062225035],"about_ca_topic_score_codex":0.0030792553,"about_ca_topic_score_gemma":0.0027854498,"teacher_disagreement_score":0.0030792553,"about_ca_system_score_codex":0.0011387884,"about_ca_system_score_gemma":0.0012513049,"threshold_uncertainty_score":0.008262575},"labels":[],"label_agreement":null},{"id":"W2943381229","doi":"10.2172/1509462","title":"U.S. National Average Electricity Grid Mix 2007","year":2012,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electricity; Reliability engineering; Quality (philosophy); Computer science; Duration (music); Cost database; Total cost; Range (aeronautics); Electric power industry; Data quality; Operations research; Environmental economics; Power (physics); Business; Operations management; Engineering; Economics; Database","score_opus":0.027499207151158445,"score_gpt":0.23905256274496187,"score_spread":0.21155335559380342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943381229","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008580161,0.0012916517,0.0011758391,0.00085300417,0.0003824305,0.00006226804,0.88428015,0.0007515104,0.10262297],"genre_scores_gemma":[0.046752404,0.0032639792,0.0030795643,0.00067717483,0.00011221314,0.00019963752,0.89283615,0.0002949225,0.052783962],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999458,0.000035808534,0.000024820622,0.00006953506,0.00033874137,0.00007312134],"domain_scores_gemma":[0.9991404,0.000047200087,0.00005770273,0.00003445318,0.00068411935,0.00003619212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035183635,0.0006946414,0.00031513002,0.0027045696,0.00051343255,0.0010858559,0.0005549957,0.0003613788,0.021020306],"category_scores_gemma":[0.001206384,0.00024331796,0.0003410241,0.0066074287,0.000078075354,0.0011126206,0.00044264886,0.00068997114,0.0135638025],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002243884,0.000025479989,0.0041561974,0.000103189435,0.00002245995,0.00001943124,0.00003366741,0.0008713213,0.0001250004,0.0033703395,0.9756811,0.015569289],"study_design_scores_gemma":[0.000013607371,0.000023173312,0.06769386,0.0001523614,0.000033595898,0.00010231431,0.00025285076,0.001392799,0.00079506135,0.001297756,0.9282154,0.000027327109],"about_ca_topic_score_codex":0.17654552,"about_ca_topic_score_gemma":0.26681176,"teacher_disagreement_score":0.17654552,"about_ca_system_score_codex":0.0029821186,"about_ca_system_score_gemma":0.0029263257,"threshold_uncertainty_score":0.35103577},"labels":[],"label_agreement":null},{"id":"W2947316945","doi":"10.22215/etd/2016-11479","title":"The Value of Demand Response in a Hydro-Dominated Power Grid - The Example of Quebec, Canada","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; HEC Montréal","funders":"","keywords":"Demand response; Revenue; Arbitrage; Electricity; Service (business); Business; Environmental economics; Value (mathematics); Grid; Control (management); Yield (engineering); Economics; Agricultural economics; Engineering; Finance; Marketing; Geography; Computer science; Electrical engineering","score_opus":0.003762793371101835,"score_gpt":0.18860792233549065,"score_spread":0.18484512896438882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947316945","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21174736,0.0050253784,0.002295123,0.026039157,0.00021269915,0.000053254662,0.001343239,0.000072598945,0.7532112],"genre_scores_gemma":[0.93657696,0.0041243467,0.0015457217,0.00050175894,0.000026661195,0.0000093408935,0.00026020987,0.000032497224,0.05692255],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956626,0.000075662545,0.0000057476027,0.000040197643,0.000114198774,0.00019795673],"domain_scores_gemma":[0.9992054,0.00011191091,0.00002395651,0.000023781598,0.0004868839,0.00014802348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003956229,0.00024727083,0.00019355946,0.0005127359,0.004464138,0.0042535425,0.00061616505,0.00065781537,0.005815814],"category_scores_gemma":[0.0015242608,0.000098680444,0.00020264872,0.0018117463,0.0016470702,0.0009768876,0.0005820636,0.0009188727,0.00029982463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004907151,0.00013992851,0.051408667,0.00039772002,0.00011684264,0.0034829732,0.0068346728,0.053910375,0.0025649671,0.5117682,0.19272093,0.176164],"study_design_scores_gemma":[0.00016024528,0.000104475956,0.1613174,0.0010071909,0.000220484,0.00070335664,0.04401903,0.08059803,0.0025098585,0.059631556,0.6494601,0.00026823752],"about_ca_topic_score_codex":0.995385,"about_ca_topic_score_gemma":0.9978136,"teacher_disagreement_score":0.07299464,"about_ca_system_score_codex":0.07299464,"about_ca_system_score_gemma":0.03638992,"threshold_uncertainty_score":0.52961564},"labels":[],"label_agreement":null},{"id":"W2947947931","doi":"10.11575/prism/35917","title":"Pre-feasibility Study Of District Energy In The West Campus Development","year":2014,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Environmental planning; Geography; Statistics","score_opus":0.008165567226426529,"score_gpt":0.17462438313382164,"score_spread":0.1664588159073951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947947931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.867089,0.00025912226,0.008591952,0.0025969387,0.000096109696,0.009080758,0.0006323134,0.00006314098,0.111590594],"genre_scores_gemma":[0.97282445,0.00037064467,0.01305281,0.00057695596,0.000012896133,0.0027918904,0.00032781213,0.000013177427,0.010029405],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98949987,0.005386424,0.00046152074,0.00055996084,0.0017310281,0.002361184],"domain_scores_gemma":[0.98938435,0.0043321666,0.00053980714,0.0007077492,0.0035668581,0.0014690716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0111127235,0.00041606274,0.0003578151,0.001168202,0.002660069,0.00337148,0.00143,0.0011588815,0.006913948],"category_scores_gemma":[0.013466692,0.00041257113,0.00053753325,0.001038774,0.001602938,0.002602701,0.0028851759,0.0018060628,0.0006310098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00560841,0.027999029,0.13980573,0.0041463412,0.00017274829,0.0063132835,0.031263366,0.031030623,0.05489589,0.18867067,0.015589312,0.4945046],"study_design_scores_gemma":[0.0014309223,0.056073997,0.2611536,0.0013702653,0.00021264552,0.0010818018,0.26805288,0.01806442,0.094369754,0.01564152,0.28219873,0.0003495129],"about_ca_topic_score_codex":0.028997576,"about_ca_topic_score_gemma":0.055210516,"teacher_disagreement_score":0.028997576,"about_ca_system_score_codex":0.012418287,"about_ca_system_score_gemma":0.01792488,"threshold_uncertainty_score":0.09010136},"labels":[],"label_agreement":null},{"id":"W2949253721","doi":"10.48550/arxiv.1112.1370","title":"Comfort-constrained distributed heat pump management","year":2011,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Dispatchable generation; Thermostat; Demand response; Computer science; Wind power; Process (computing); Controller (irrigation); Peaking power plant; Component (thermodynamics); Load management; Power (physics); Aggregate (composite); Control (management); Distributed generation; Control engineering; Engineering; Mechanical engineering; Renewable energy; Electricity; Electrical engineering","score_opus":0.04446143343160383,"score_gpt":0.1510098718359841,"score_spread":0.10654843840438027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949253721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056626778,0.0002781033,0.92969424,0.00027969462,0.00007112288,0.00006127195,0.00008680689,0.00031389866,0.012588133],"genre_scores_gemma":[0.98492426,0.00008010515,0.012067841,0.00003461615,0.000021460906,0.000037312515,0.00003232737,0.000023673076,0.0027784386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975866,0.00006448035,0.000008052119,0.000060742826,0.00006519023,0.00004285399],"domain_scores_gemma":[0.9998646,0.000058935486,0.000017709519,0.000011925516,0.000032289827,0.000014508694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030186278,0.0005502656,0.0004935742,0.00012871088,0.00031832774,0.0008034,0.00067974767,0.00038945943,0.0035832892],"category_scores_gemma":[0.0006940925,0.00023348977,0.00021048711,0.00016684867,0.0002754768,0.0006767287,0.00079428597,0.000455488,0.0002905512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016186404,0.000089074776,0.0005026789,0.000087429675,0.000023060928,0.00006876886,0.000070851886,0.92542344,0.008516107,0.016494654,0.0013745395,0.047187608],"study_design_scores_gemma":[0.00000898097,0.00003513115,0.00012176396,0.0000021193403,0.000004169793,0.000009818607,0.000011167919,0.9952579,0.000998182,0.002599797,0.00094738434,0.0000035771457],"about_ca_topic_score_codex":0.0013454875,"about_ca_topic_score_gemma":0.0015565079,"teacher_disagreement_score":0.0035832892,"about_ca_system_score_codex":0.0003781188,"about_ca_system_score_gemma":0.00042127058,"threshold_uncertainty_score":0.011987269},"labels":[],"label_agreement":null},{"id":"W2949294780","doi":"10.48550/arxiv.1601.05678","title":"Achieving an optimal trade-off between revenue and energy peak within a smart grid environment","year":2016,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Revenue; Smart grid; Schedule; Monopolistic competition; Grid; Set (abstract data type); Computer science; Mathematical optimization; Constraint (computer-aided design); Task (project management); Microeconomics; Operations research; Trade-off; Economics; Mathematics; Engineering; Finance","score_opus":0.030418273034504756,"score_gpt":0.15103934625275942,"score_spread":0.12062107321825466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949294780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30341023,0.00024926433,0.653813,0.0012256022,0.00003852915,0.00011749343,0.00018448649,0.00028711444,0.040674236],"genre_scores_gemma":[0.96205086,0.00014113085,0.03546011,0.000058870868,0.000009300424,0.000038850572,0.000025986255,0.00004714478,0.0021677893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994535,0.00022498232,0.000011678603,0.00006453743,0.00007355386,0.00017179448],"domain_scores_gemma":[0.9992015,0.0005042079,0.00008073448,0.000049956416,0.000070870134,0.00009277854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012177437,0.0006197619,0.00089593447,0.00041854006,0.00049789855,0.0018254693,0.0007778743,0.0012941443,0.0036808515],"category_scores_gemma":[0.003265063,0.00041698056,0.00037225688,0.00072951586,0.00095163175,0.0022424583,0.0015109897,0.00083889934,0.00040171974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011946404,0.000104527426,0.00048443078,0.00007592887,0.000025362042,0.00012438832,0.00007262007,0.9293699,0.0020211658,0.05924673,0.00074785715,0.0076075215],"study_design_scores_gemma":[0.000028153952,0.00005519709,0.00010939348,0.000008028331,0.0000067230226,0.00003572221,0.000082527054,0.96188647,0.00077874126,0.0365261,0.00047513013,0.0000077412],"about_ca_topic_score_codex":0.0016491864,"about_ca_topic_score_gemma":0.001723599,"teacher_disagreement_score":0.0036808515,"about_ca_system_score_codex":0.0009111975,"about_ca_system_score_gemma":0.0011422869,"threshold_uncertainty_score":0.012313664},"labels":[],"label_agreement":null},{"id":"W2949587434","doi":"10.1145/3307772.3331032","title":"Adaptive Battery Control with Neural Networks","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controller (irrigation); Computer science; Battery (electricity); Model predictive control; Context (archaeology); Artificial neural network; Control (management); Adaptive control; Control engineering; Engineering; Power (physics); Artificial intelligence","score_opus":0.0030914774960631355,"score_gpt":0.14044287207262957,"score_spread":0.13735139457656642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949587434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06453083,0.0020255095,0.9137283,0.0007094604,0.0002792408,0.00009198036,0.00014850251,0.0015935245,0.016892653],"genre_scores_gemma":[0.9721666,0.0002555564,0.021927873,0.00014936627,0.000059543352,0.000099561934,0.0000847321,0.000030273939,0.005226495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997676,0.00003706382,0.000015887088,0.000070525064,0.000060209535,0.000048834747],"domain_scores_gemma":[0.99936503,0.0003513796,0.000073136915,0.000029796209,0.00016304158,0.000017577166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004899601,0.00079404534,0.0006214419,0.0003157929,0.00032478865,0.0008439561,0.0009107556,0.00095802435,0.0021798157],"category_scores_gemma":[0.0017916424,0.00037994375,0.00036834323,0.0003852289,0.00052065076,0.000644855,0.0006414775,0.0010990697,0.00029684385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028596634,0.000023912553,0.00020551127,0.000023821054,0.000014980914,0.000018677098,0.000009687084,0.9765097,0.0006530459,0.001176017,0.00035916292,0.020976929],"study_design_scores_gemma":[0.0000024775259,0.0000069390494,0.00003571401,0.0000018022322,0.0000016888976,0.0000017211753,9.251704e-7,0.9992143,0.00013775092,0.0005131006,0.000082232706,0.0000014563803],"about_ca_topic_score_codex":0.018020142,"about_ca_topic_score_gemma":0.014582832,"teacher_disagreement_score":0.018020142,"about_ca_system_score_codex":0.0008946246,"about_ca_system_score_gemma":0.0006157661,"threshold_uncertainty_score":0.035830557},"labels":[],"label_agreement":null},{"id":"W2950399521","doi":"","title":"SDP Relaxation with Randomized Rounding for Energy Disaggregation","year":2016,"lang":"en","type":"preprint","venue":"Spiral (Imperial College London)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Rounding; Randomized rounding; Semidefinite programming; Scalability; Relaxation (psychology); Computer science; Mathematical optimization; Inference; Quadratic programming; Energy consumption; Energy (signal processing); Integer programming; Integer (computer science); Quadratic equation; Task (project management); Algorithm; Linear programming; Mathematics; Artificial intelligence; Statistics","score_opus":0.008976687618679407,"score_gpt":0.20824205532135964,"score_spread":0.19926536770268025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950399521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032775945,0.00030797624,0.9924758,0.00038259238,0.00009595572,0.000054783526,0.00011913774,0.00031779578,0.0029682892],"genre_scores_gemma":[0.26858246,0.0005562436,0.72266424,0.0006703831,0.00022438569,0.00055370893,0.0005924794,0.0004410159,0.005715108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848,0.00075449655,0.00005895724,0.00026729624,0.0002935938,0.00014562251],"domain_scores_gemma":[0.99627846,0.0028804292,0.00021570525,0.00025183268,0.00026230066,0.000111265144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029529526,0.001593473,0.0016695855,0.0005566526,0.0004749464,0.0012769573,0.0011214835,0.00129863,0.0054875803],"category_scores_gemma":[0.0077233054,0.00067720097,0.0011648713,0.00087999774,0.0011725829,0.001136136,0.0016708871,0.0036659513,0.0008281052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008135268,0.00006694812,0.0002064229,0.0001368272,0.000034941935,0.00008240471,0.000044227054,0.9451236,0.00057654467,0.026145766,0.0044370443,0.02306384],"study_design_scores_gemma":[0.000017404773,0.000017118866,0.000020956335,0.000009789194,0.000003201464,0.0000104193505,0.00000854614,0.98711467,0.00017080404,0.011904773,0.0007188948,0.0000034308198],"about_ca_topic_score_codex":0.004101941,"about_ca_topic_score_gemma":0.003915744,"teacher_disagreement_score":0.0054875803,"about_ca_system_score_codex":0.0010691233,"about_ca_system_score_gemma":0.0022366385,"threshold_uncertainty_score":0.018357813},"labels":[],"label_agreement":null},{"id":"W2950431277","doi":"10.1109/tsg.2018.2865702","title":"Residential Household Non-Intrusive Load Monitoring via Graph-Based Multi-Label Semi-Supervised Learning","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Computer science; Graph; Machine learning; Artificial intelligence; Theoretical computer science","score_opus":0.021403791138038267,"score_gpt":0.23024522277712753,"score_spread":0.20884143163908925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950431277","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15570599,0.0005175094,0.82714623,0.0004982628,0.000083657695,0.0002612881,0.00248384,0.010110697,0.0031925335],"genre_scores_gemma":[0.73081297,0.00014681896,0.25629315,0.00023871602,0.00008178036,0.00021880028,0.008675126,0.00022744668,0.003305163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984816,0.0004912734,0.00007993116,0.0005717249,0.00027178787,0.0001037696],"domain_scores_gemma":[0.99700433,0.0011575078,0.00049305306,0.0007000702,0.0005153155,0.00012973558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012734825,0.0012675287,0.0012887077,0.0015245904,0.00063264015,0.000884638,0.0028323114,0.0011356777,0.0010511972],"category_scores_gemma":[0.003633336,0.00041885837,0.000865216,0.0014484271,0.00070424925,0.0020664423,0.001254797,0.0012912232,0.00075408333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073515653,0.0010944121,0.011997663,0.00037767531,0.0002691904,0.00027250036,0.0003285391,0.51221603,0.007053136,0.004645103,0.022222217,0.43878838],"study_design_scores_gemma":[0.000008674605,0.000017422435,0.0005358724,0.0000035137457,0.000006585547,0.000020623522,0.000015867545,0.995665,0.0011164958,0.0021862118,0.00041750548,0.0000061653927],"about_ca_topic_score_codex":0.0076658605,"about_ca_topic_score_gemma":0.016406965,"teacher_disagreement_score":0.0076658605,"about_ca_system_score_codex":0.001166563,"about_ca_system_score_gemma":0.0008541853,"threshold_uncertainty_score":0.015242517},"labels":[],"label_agreement":null},{"id":"W2951766939","doi":"10.1145/3307772.3328279","title":"EnergyBoost","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science","score_opus":0.0014291011925727664,"score_gpt":0.12578865276529858,"score_spread":0.12435955157272581,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2951766939","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03910704,0.005021277,0.86496437,0.0024852192,0.0026488877,0.0011698257,0.0031749916,0.032026563,0.04940177],"genre_scores_gemma":[0.3851072,0.001396929,0.54576844,0.0031755746,0.00053307426,0.0017615493,0.00885815,0.0028471313,0.05055198],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999131,0.00023852795,0.000060959785,0.00024555245,0.00016221391,0.0001617127],"domain_scores_gemma":[0.99869734,0.00080236053,0.00006850081,0.000120092154,0.00024919247,0.00006257768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001583002,0.0017387575,0.0018885055,0.001295641,0.0007498847,0.0014943662,0.0034090544,0.0028141956,0.030964024],"category_scores_gemma":[0.0033210719,0.00074594084,0.0011886191,0.0014358192,0.0006077448,0.0011418979,0.0009487166,0.0021103183,0.008439112],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085232954,0.0007570037,0.0022949034,0.00062119035,0.0002798628,0.00013679924,0.00005951042,0.4464503,0.0011832685,0.01096226,0.0809242,0.45547843],"study_design_scores_gemma":[0.00014586207,0.000086264045,0.00021310522,0.0000448303,0.000024779423,0.000040677816,0.00002873778,0.9779484,0.000767768,0.007679269,0.01300705,0.000013236025],"about_ca_topic_score_codex":0.007779874,"about_ca_topic_score_gemma":0.0096494835,"teacher_disagreement_score":0.030964024,"about_ca_system_score_codex":0.0011419904,"about_ca_system_score_gemma":0.0025375818,"threshold_uncertainty_score":0.103584945},"labels":[],"label_agreement":null},{"id":"W2952132193","doi":"10.1109/tsg.2016.2550500","title":"Real-Time Residential-Side Joint Energy Storage Management and Load Scheduling With Renewable Integration","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Lyapunov optimization; Scheduling (production processes); Energy storage; Dynamic priority scheduling; Renewable energy; Fair-share scheduling; Time horizon; Demand response; Model predictive control; Load management","score_opus":0.008173285689012088,"score_gpt":0.1841978207906166,"score_spread":0.1760245351016045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952132193","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19314285,0.00018914514,0.79906774,0.00028114291,0.000046546655,0.00008966432,0.00007799634,0.00049550855,0.006609412],"genre_scores_gemma":[0.9842637,0.00003796596,0.01470136,0.000012405816,0.000007122695,0.00002495331,0.000016324004,0.000009667264,0.00092646736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976975,0.00006889478,0.000011452989,0.00004966471,0.00005046871,0.000049802777],"domain_scores_gemma":[0.99972683,0.000099601144,0.00006356558,0.000034050983,0.000049340713,0.000026587153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041795892,0.00048817325,0.0005450776,0.00014018653,0.00031141762,0.00058765104,0.00063572,0.00048290656,0.00155041],"category_scores_gemma":[0.0008211847,0.00020449227,0.0003010724,0.00041195963,0.00048395584,0.00066531927,0.00053379487,0.0004253573,0.00018965322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000100151534,0.00004600163,0.0003598937,0.000027724269,0.000009934007,0.00008196275,0.00002255597,0.9839745,0.0024224182,0.0030961582,0.00020582946,0.009652979],"study_design_scores_gemma":[0.0000071199734,0.000022784241,0.00007234811,8.066659e-7,0.000003097104,0.000009185837,0.000008303161,0.9984137,0.00074755616,0.00061974843,0.00009258611,0.0000027591038],"about_ca_topic_score_codex":0.005230159,"about_ca_topic_score_gemma":0.005542816,"teacher_disagreement_score":0.005230159,"about_ca_system_score_codex":0.00058742455,"about_ca_system_score_gemma":0.0008873233,"threshold_uncertainty_score":0.010399461},"labels":[],"label_agreement":null},{"id":"W2952263936","doi":"10.1109/icps.2019.8733383","title":"Stochastic Multi-objective Economic/Emission Energy Management of a Microgrid in Presence of Combined Heat and Power Systems","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Microgrid; Energy management; Power (physics); Energy (signal processing); Computer science; Electric power system; Reliability engineering; Environmental science; Engineering; Mathematics; Physics; Thermodynamics","score_opus":0.004715486669662024,"score_gpt":0.18686695708394632,"score_spread":0.1821514704142843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952263936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2719717,0.00037050736,0.7161419,0.0003960553,0.000054207543,0.000117457144,0.00017724847,0.00018566447,0.010585332],"genre_scores_gemma":[0.98812556,0.000089931746,0.010215449,0.000018155222,0.0000108855365,0.00005939281,0.000034913795,0.000011499523,0.0014342746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961996,0.0001727618,0.000013337023,0.000051099178,0.00008027009,0.00006254065],"domain_scores_gemma":[0.9996094,0.00020238411,0.00008070569,0.00001881254,0.000057916313,0.00003078988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091486506,0.00075738854,0.0007652307,0.00031837146,0.00039263236,0.0009502949,0.00063316675,0.00058076385,0.0010020039],"category_scores_gemma":[0.00096072484,0.00040092203,0.0006838578,0.00039438723,0.0004179508,0.0005426927,0.00066284207,0.00053113315,0.00007436543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013327916,0.000010302778,0.00014329462,0.000009513512,0.000011052487,0.00002696689,0.0000044639864,0.9970681,0.0002712437,0.0009912972,0.000046553574,0.0014038],"study_design_scores_gemma":[0.000002520347,0.000013091115,0.000101970094,9.696788e-7,0.0000042295187,0.0000034912487,0.000004062444,0.99928623,0.00010350747,0.00043019312,0.00004827349,0.0000014542187],"about_ca_topic_score_codex":0.006074916,"about_ca_topic_score_gemma":0.0054244553,"teacher_disagreement_score":0.006074916,"about_ca_system_score_codex":0.00073327584,"about_ca_system_score_gemma":0.0008799578,"threshold_uncertainty_score":0.01207912},"labels":[],"label_agreement":null},{"id":"W2952829024","doi":"10.17159/2413-3051/2019/v30i2a6375","title":"Alternatives for small, medium and micro scale enterprises participation in the renewable energy industry – small scale embedded generation review","year":2019,"lang":"en","type":"article","venue":"Journal of Energy in Southern Africa","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Society of Intestinal Research","funders":"","keywords":"Renewable energy; Procurement; Scale (ratio); Business; Electricity generation; Environmental economics; Electricity; Photovoltaic system; Solar energy; Renewable resource; Solar power; Natural resource economics; Economics; Power (physics); Engineering; Electrical engineering; Marketing; Geography","score_opus":0.02410192090593133,"score_gpt":0.24299698428196745,"score_spread":0.21889506337603612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952829024","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013459475,0.9830912,0.00048826053,0.0040992945,0.0007987943,0.000027996693,0.00002500336,0.000004689228,0.010118828],"genre_scores_gemma":[0.021032413,0.97384256,0.0005088481,0.0011190556,0.0004442112,0.00003451108,0.000033966346,0.0000038741778,0.002980516],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993286,0.00025367577,0.0000654234,0.000057197227,0.00019977374,0.00009539979],"domain_scores_gemma":[0.9966534,0.0022533773,0.00031449573,0.000038726103,0.00059349224,0.00014662251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014184592,0.0002853718,0.0003736264,0.0013525821,0.00034676102,0.0015933787,0.00063002546,0.0010826963,0.006816529],"category_scores_gemma":[0.0031742274,0.000115035786,0.00033987322,0.0015306394,0.00046591825,0.0018720921,0.0006415628,0.0008728149,0.0007521044],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088971596,0.00011192046,0.00061754347,0.05180639,0.00008161628,0.0004260347,0.00073266943,0.00079268246,0.001236793,0.09220769,0.052452903,0.79944474],"study_design_scores_gemma":[0.000005658545,0.00009190205,0.0011311905,0.022814214,0.000058690508,0.00027887936,0.00084241305,0.00013809268,0.00031191396,0.004914349,0.9694036,0.000009011604],"about_ca_topic_score_codex":0.0017988536,"about_ca_topic_score_gemma":0.005506002,"teacher_disagreement_score":0.006816529,"about_ca_system_score_codex":0.001083389,"about_ca_system_score_gemma":0.0034481694,"threshold_uncertainty_score":0.022803605},"labels":[],"label_agreement":null},{"id":"W2953122584","doi":"10.48550/arxiv.1506.04799","title":"Power Systems Without Fuel","year":2015,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Renewable energy; Fossil fuel; Electric power system; Wind power; Energy source; Environmental economics; Electricity generation; Power (physics); Fuel cells; Computer science; Automotive engineering; Environmental science; Engineering; Electrical engineering; Economics; Waste management","score_opus":0.05018123947120218,"score_gpt":0.15998100782406055,"score_spread":0.10979976835285837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953122584","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010134775,0.010870064,0.39435065,0.012925438,0.0035047682,0.00012698388,0.0017651601,0.0010831731,0.565239],"genre_scores_gemma":[0.58152926,0.01941477,0.07876485,0.003863747,0.0032936851,0.00039242554,0.0021722293,0.00048219014,0.31008676],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935204,0.00014676135,0.000025615494,0.00018833569,0.00023824626,0.00004901363],"domain_scores_gemma":[0.99953496,0.00010637466,0.00003344285,0.00022463273,0.00007504354,0.000025550693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041947933,0.0007569686,0.00079486857,0.00038685644,0.00081643695,0.0024694086,0.0008792727,0.0012573788,0.025224011],"category_scores_gemma":[0.0018361965,0.0002672287,0.00039193098,0.00084795913,0.0014966413,0.0043794564,0.0016890753,0.002258768,0.0075670104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073437595,0.0000060405296,0.00004725636,0.000052821546,0.0000064406295,0.00004032125,0.000030899486,0.0036721078,0.00020497278,0.96599567,0.008377353,0.02155893],"study_design_scores_gemma":[0.000013059331,0.000017161796,0.00009793527,0.000049765928,0.000006061887,0.00010650612,0.00002409189,0.013281006,0.00028168826,0.81231177,0.17380284,0.000008082604],"about_ca_topic_score_codex":0.0013836103,"about_ca_topic_score_gemma":0.0009943235,"teacher_disagreement_score":0.025224011,"about_ca_system_score_codex":0.000975329,"about_ca_system_score_gemma":0.001003111,"threshold_uncertainty_score":0.08438271},"labels":[],"label_agreement":null},{"id":"W2953430238","doi":"10.4018/978-1-5225-8559-6.ch010","title":"Economically Optimal Solar Power Generation","year":2019,"lang":"en","type":"book-chapter","venue":"Practice, progress, and proficiency in sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Agriculture Environmental Renewal Canada (Canada); University of Ottawa","funders":"","keywords":"Electricity; Profitability index; Grid parity; Renewable energy; Stand-alone power system; Environmental economics; Electricity retailing; Installation; Consumption (sociology); Electricity generation; Business; Solar power; Photovoltaic system; Electrical engineering; Engineering; Economics; Power (physics); Finance; Electricity market; Distributed generation; Mechanical engineering","score_opus":0.008749815129982377,"score_gpt":0.2360132433738827,"score_spread":0.2272634282439003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953430238","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016628407,0.00547254,0.058111865,0.002496061,0.0003649748,0.000037204998,0.00042084896,0.00013637202,0.9163317],"genre_scores_gemma":[0.81903017,0.0060179452,0.013168699,0.00024159865,0.0001659421,0.000044076456,0.000273375,0.000080927646,0.16097729],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984944,0.000039426053,0.00000311405,0.000022396925,0.000060878832,0.000024730261],"domain_scores_gemma":[0.9999107,0.000046394645,0.0000054599377,0.000012593975,0.000016779326,0.000008003522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019568234,0.00034400978,0.000264414,0.00027048663,0.00033408997,0.0015652283,0.00047031417,0.00058954244,0.014558705],"category_scores_gemma":[0.0005770417,0.0002325686,0.00020643193,0.00048017845,0.00048015965,0.0008945291,0.0004688547,0.0006362746,0.0016234963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086904096,0.00006199459,0.0005496218,0.00017978258,0.000020080855,0.00016823263,0.00007880018,0.13824742,0.0019443833,0.6691897,0.038344905,0.15112819],"study_design_scores_gemma":[0.000033935365,0.00005982575,0.001350654,0.00016588418,0.000022314438,0.0002067435,0.0003360204,0.16786447,0.0019683365,0.63809186,0.18987064,0.000029297667],"about_ca_topic_score_codex":0.0028438345,"about_ca_topic_score_gemma":0.010974934,"teacher_disagreement_score":0.014558705,"about_ca_system_score_codex":0.0017302255,"about_ca_system_score_gemma":0.001090699,"threshold_uncertainty_score":0.04870373},"labels":[],"label_agreement":null},{"id":"W2954802233","doi":"10.1109/isgt.2019.8791595","title":"Smart Households Demand Response Management with Micro Grid","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Demand response; Smart grid; Schedule; Photovoltaic system; Incentive; Computer science; Load management; Peak demand; Grid; Electricity; Energy management; Environmental economics; Energy management system; Operations research; Energy (signal processing); Engineering; Economics; Microeconomics; Electrical engineering","score_opus":0.008703546745098647,"score_gpt":0.18753385460524868,"score_spread":0.17883030786015003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954802233","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15089893,0.00030154662,0.8340144,0.0004325726,0.00006330292,0.00012071065,0.00024559585,0.0017522349,0.01217073],"genre_scores_gemma":[0.97755927,0.00005571504,0.019483197,0.00003052272,0.0000100427815,0.000045250155,0.00005639664,0.000027077576,0.0027324455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979466,0.00008113889,0.000007999755,0.000052949104,0.00004264817,0.000020671945],"domain_scores_gemma":[0.9998516,0.00006522358,0.000028504786,0.000015292793,0.00003131074,0.000008011777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026218157,0.00030259264,0.00038657698,0.00012657749,0.00014548643,0.00042811967,0.00038006747,0.0002757924,0.001834921],"category_scores_gemma":[0.00033040933,0.00016327933,0.00020895658,0.00022084544,0.00014061749,0.00040966918,0.00029581043,0.00031970246,0.00032442936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000111960086,0.00008314059,0.00075159385,0.00004603697,0.00002389009,0.00004293471,0.00003776594,0.94105685,0.0034620764,0.002207083,0.0012243864,0.050952177],"study_design_scores_gemma":[0.0000046702326,0.000018342911,0.00019054457,0.0000012876312,0.0000028278644,0.0000048427964,0.000009369625,0.99785835,0.0006614791,0.00066334073,0.00058222236,0.0000027040808],"about_ca_topic_score_codex":0.003656725,"about_ca_topic_score_gemma":0.004927495,"teacher_disagreement_score":0.003656725,"about_ca_system_score_codex":0.00047255817,"about_ca_system_score_gemma":0.00031533948,"threshold_uncertainty_score":0.0072708726},"labels":[],"label_agreement":null},{"id":"W2956001012","doi":"10.29173/mocs115","title":"Toward Community Generation: Energy Simulation and Performance Evaluation of Multi-family Solar PV Settings for Energy-efficient Homes in Edmonton, Canada","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Environmental science; Greenhouse gas; Solar energy; Grid; Distributed generation; Meteorology; Engineering; Electrical engineering; Economics; Geography","score_opus":0.02351932681421245,"score_gpt":0.21375214208538668,"score_spread":0.19023281527117422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956001012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9824057,0.00013395697,0.0046749115,0.0001722407,0.000021536895,0.00014309601,0.00087418256,0.00019709094,0.011377253],"genre_scores_gemma":[0.99256927,0.00008168256,0.0037336494,0.000023798222,0.0000020777486,0.000046868026,0.0006643739,0.000021815933,0.0028564024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997733,0.000053128242,0.0000056718027,0.00002905679,0.000051138562,0.00008762308],"domain_scores_gemma":[0.99954504,0.00015511845,0.000020093286,0.0000229331,0.00019298139,0.00006366461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006573128,0.00079123775,0.00057441264,0.0006116084,0.001279617,0.0009710644,0.0013870628,0.0008571093,0.0025285364],"category_scores_gemma":[0.00096257834,0.0003767912,0.0006469853,0.00094038865,0.00057178555,0.00044818677,0.0005638575,0.0006475732,0.00020006686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015660666,0.00024372095,0.0071031014,0.000042095202,0.000020333226,0.00014388617,0.00006767988,0.9849857,0.0005095225,0.0006613737,0.0009991785,0.005066752],"study_design_scores_gemma":[0.00005562907,0.000059354283,0.0030227818,0.000007017157,0.00000888569,0.000009880124,0.00020760093,0.99533683,0.0005086138,0.00014794126,0.00062475994,0.000010821244],"about_ca_topic_score_codex":0.87667084,"about_ca_topic_score_gemma":0.8876797,"teacher_disagreement_score":0.12332916,"about_ca_system_score_codex":0.00764273,"about_ca_system_score_gemma":0.0064667054,"threshold_uncertainty_score":0.24811089},"labels":[],"label_agreement":null},{"id":"W2956259548","doi":"10.18280/mmep.020101","title":"THE PROPORTION OF ENERGY CONSUMPTION STRUCTURE PREDICTION BASED ON MARKOV CHAIN","year":2015,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Markov chain; Energy consumption; Consumption (sociology); Markov model; Computer science; Econometrics; Mathematics; Statistics; Engineering; Sociology","score_opus":0.018107409333400867,"score_gpt":0.1810876993335276,"score_spread":0.16298029000012676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956259548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31153613,0.0009041845,0.6819421,0.00067391316,0.00012965295,0.00005857838,0.00027830913,0.00035381247,0.004123366],"genre_scores_gemma":[0.9779838,0.00049068755,0.019400505,0.0000680992,0.000070877504,0.000047505462,0.00043931516,0.000065318585,0.0014338733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814713,0.00053198845,0.00010636816,0.0005693024,0.00046637675,0.00017875328],"domain_scores_gemma":[0.9775088,0.0186638,0.00073914754,0.0012472022,0.0015706832,0.00027036198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038768544,0.0005075567,0.0013340877,0.0011015066,0.0007070916,0.0014387887,0.0015765287,0.0009574216,0.002322946],"category_scores_gemma":[0.025217567,0.00047672194,0.00092081795,0.0013137001,0.000960422,0.0045308787,0.0011415705,0.0011241982,0.00023879338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006108949,0.00009254495,0.027566787,0.0001851659,0.00014213285,0.00014152903,0.00012722518,0.88687664,0.0024041473,0.02761777,0.0012875722,0.052947514],"study_design_scores_gemma":[0.000004122574,0.000011489389,0.0013450686,0.0000064284136,0.000016322087,0.000032586333,0.000010077384,0.9926399,0.0006600045,0.005157921,0.00010960027,0.0000064987526],"about_ca_topic_score_codex":0.0054460685,"about_ca_topic_score_gemma":0.003085346,"teacher_disagreement_score":0.0054460685,"about_ca_system_score_codex":0.0013716043,"about_ca_system_score_gemma":0.001546837,"threshold_uncertainty_score":0.020502985},"labels":[],"label_agreement":null},{"id":"W2957966199","doi":"10.1109/appeec45492.2019.8994618","title":"Universal Non-Intrusive Load Monitoring (UNILM) Using Filter Pipelines, Probabilistic Knapsack, and Labelled Partition Maps","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Partition (number theory); Knapsack problem; Probabilistic logic; Computer science; Energy consumption; Pipeline (software); Pipeline transport; Filter (signal processing); Real-time computing; Aggregate (composite); Energy (signal processing); Gaussian; Data mining; Engineering; Artificial intelligence; Algorithm; Statistics; Mathematics; Computer vision","score_opus":0.01845213181090136,"score_gpt":0.21731612604694045,"score_spread":0.1988639942360391,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2957966199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02010923,0.0000731846,0.9764731,0.000040683328,0.000018586115,0.00004318353,0.00009210439,0.0026443978,0.0005056419],"genre_scores_gemma":[0.4694077,0.0001046138,0.52665776,0.00007402031,0.000033648343,0.0001338138,0.0007143706,0.00029532338,0.0025787568],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989084,0.00023758812,0.000051622803,0.0003557772,0.00027288756,0.00017360931],"domain_scores_gemma":[0.9984825,0.0006311842,0.00023240263,0.00033115223,0.0002454771,0.00007739898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013872313,0.0013977995,0.0009990052,0.0010449314,0.00065712456,0.0012589901,0.0015576496,0.0008194653,0.0017624845],"category_scores_gemma":[0.00319457,0.0006885336,0.0008542984,0.001553267,0.00095020706,0.0026337323,0.001690297,0.0009927488,0.00073129666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00088948326,0.00039267106,0.0050854436,0.00019365613,0.00019079792,0.00015651845,0.0003021569,0.50796765,0.019399654,0.009424573,0.0027259567,0.4532715],"study_design_scores_gemma":[0.000008987386,0.000056545134,0.0008202621,0.000004392354,0.000009329899,0.000026096393,0.000021722019,0.98776025,0.0064776666,0.0041845595,0.0006129081,0.000017415443],"about_ca_topic_score_codex":0.016882554,"about_ca_topic_score_gemma":0.021164585,"teacher_disagreement_score":0.016882554,"about_ca_system_score_codex":0.0011909226,"about_ca_system_score_gemma":0.0012411742,"threshold_uncertainty_score":0.03356856},"labels":[],"label_agreement":null},{"id":"W2959590757","doi":"10.18280/ejee.210112","title":"A Blockchain-based Spot Market Transaction Model for Energy Power Supply and Demand Network","year":2019,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blockchain; Database transaction; Spot market; Spot contract; Power market; Hot spot (computer programming); Business; Supply and demand; Power (physics); Industrial organization; Commerce; Economics; Computer science; Computer security; Microeconomics; Computer network; Electric power system; Database; Electricity; Electrical engineering; Engineering; Finance; Futures contract","score_opus":0.0036110909877957228,"score_gpt":0.1534590561011056,"score_spread":0.1498479651133099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959590757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08993675,0.000484228,0.8889732,0.00087225606,0.00012779792,0.00021124295,0.0007222421,0.00030776102,0.018364476],"genre_scores_gemma":[0.9667773,0.00038055427,0.022013076,0.000058940976,0.000038360722,0.00019311704,0.0002868359,0.00003419189,0.010217456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999059,0.0002860099,0.000058180125,0.00023399258,0.00020023246,0.00016259715],"domain_scores_gemma":[0.99858886,0.00067532784,0.0001880071,0.00011207515,0.0003092137,0.0001265169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011866926,0.00073369936,0.0012772274,0.00049033854,0.00093835924,0.0018339482,0.0018349967,0.001594057,0.008922724],"category_scores_gemma":[0.002521712,0.00048433428,0.0007259643,0.00099175,0.0011277351,0.0028887074,0.0012736958,0.0015266322,0.00076751213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095953474,0.00004015752,0.000480687,0.000048766546,0.000021460626,0.00023399731,0.00008213881,0.9561533,0.00086834107,0.035237174,0.0008128293,0.0059252633],"study_design_scores_gemma":[0.000009794079,0.000017218774,0.000046555073,0.0000023967823,0.0000046815503,0.00001528872,0.000009385832,0.99366295,0.000069673886,0.005847913,0.0003099177,0.0000041910394],"about_ca_topic_score_codex":0.011348418,"about_ca_topic_score_gemma":0.010469812,"teacher_disagreement_score":0.011348418,"about_ca_system_score_codex":0.0014133179,"about_ca_system_score_gemma":0.0017792926,"threshold_uncertainty_score":0.02984947},"labels":[],"label_agreement":null},{"id":"W2961459624","doi":"10.11575/prism/36448","title":"Optimal Energy Management of a SAGD Microgrid Participating in a Volatile Electricity Market","year":2019,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Microgrid; Electricity; Electricity market; Energy management; Energy market; Petroleum engineering; Business; Environmental economics; Energy (signal processing); Waste management; Engineering; Renewable energy; Economics; Electrical engineering; Mathematics","score_opus":0.013542839950893708,"score_gpt":0.25506440601429503,"score_spread":0.24152156606340133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2961459624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6099152,0.0005284515,0.3350073,0.001403196,0.00010523484,0.00017370954,0.00035144077,0.00025713156,0.05225836],"genre_scores_gemma":[0.98782104,0.00013736158,0.008879064,0.000023490205,0.000013177741,0.000024002602,0.000048182916,0.000017375818,0.0030363991],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987173,0.00005640591,0.0000037788268,0.000019305946,0.000018684432,0.000029964067],"domain_scores_gemma":[0.99987197,0.000060085546,0.000024192052,0.0000057229504,0.000019355726,0.000018732895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004223776,0.00046465287,0.0005040913,0.00025624476,0.00036981187,0.0012359087,0.00039436333,0.0004982601,0.0020790435],"category_scores_gemma":[0.0007152849,0.00030637128,0.00029783664,0.00029206873,0.00041655204,0.0006109518,0.00059292576,0.0005118728,0.00013986022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039982962,0.000022405406,0.00025228568,0.0000150620435,0.0000098706505,0.000049464783,0.000017660775,0.9885966,0.00044553666,0.0063278317,0.0003859027,0.0038373084],"study_design_scores_gemma":[0.000008492852,0.000020667443,0.00012804888,0.000002186318,0.0000032012022,0.000004232722,0.00003510568,0.9970548,0.000115361385,0.0023570121,0.00026855367,0.0000023882083],"about_ca_topic_score_codex":0.009131361,"about_ca_topic_score_gemma":0.009258118,"teacher_disagreement_score":0.009131361,"about_ca_system_score_codex":0.0010205383,"about_ca_system_score_gemma":0.0014152903,"threshold_uncertainty_score":0.018156469},"labels":[],"label_agreement":null},{"id":"W2962947610","doi":"10.3390/en12152867","title":"Multi-Agent Optimization for Residential Demand Response under Real-Time Pricing","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"SaskPower","keywords":"Demand response; Electricity; Flexibility (engineering); Computer science; Electricity market; Heuristic; Electricity pricing; Renewable energy; Consumption (sociology); Electric power system; Mathematical optimization; Dynamic pricing; Electricity retailing; Environmental economics; Power (physics); Engineering; Microeconomics; Economics; Artificial intelligence","score_opus":0.008922518446154899,"score_gpt":0.21734951173443953,"score_spread":0.20842699328828462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2962947610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060408372,0.00049735693,0.92797333,0.000692713,0.000079784026,0.000105038176,0.00010147101,0.0001846206,0.009957361],"genre_scores_gemma":[0.9416927,0.00027624532,0.05190821,0.00009241728,0.000031420375,0.00019205142,0.000075814474,0.000040270716,0.0056908624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994134,0.00031855472,0.000016516167,0.00008218079,0.00008571766,0.00008373568],"domain_scores_gemma":[0.9987909,0.00080614357,0.00016572484,0.000029715036,0.00014185232,0.000065651635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011559201,0.0009938495,0.0011278415,0.00049427967,0.0005311169,0.0012360216,0.00097483344,0.0012685644,0.002624777],"category_scores_gemma":[0.0024731476,0.00056250696,0.0006455265,0.0005661316,0.00074661925,0.0008459195,0.00089194137,0.001239702,0.00025305356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002553919,0.000023784627,0.00016621324,0.000015553154,0.000013204096,0.000040083676,0.000011931227,0.99413884,0.00013706453,0.003366664,0.00021752971,0.0018436234],"study_design_scores_gemma":[0.0000034863808,0.0000053242547,0.000020353351,7.20363e-7,0.0000017553493,0.0000015774725,0.0000035357998,0.9994006,0.00001983246,0.00048270525,0.000059264603,8.816406e-7],"about_ca_topic_score_codex":0.01106093,"about_ca_topic_score_gemma":0.008236873,"teacher_disagreement_score":0.01106093,"about_ca_system_score_codex":0.0013053102,"about_ca_system_score_gemma":0.0012709354,"threshold_uncertainty_score":0.0219931},"labels":[],"label_agreement":null},{"id":"W2963530719","doi":"10.1080/03155986.2019.1624491","title":"Least squares policy iteration with instrumental variables vs. direct policy search: comparison against optimal benchmarks using energy storage","year":2019,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Instrumental variable; Least-squares function approximation; Computer science; Mathematical optimization; Energy (signal processing); Econometrics; Algorithm; Mathematics; Statistics","score_opus":0.027285002775980303,"score_gpt":0.28937836300468023,"score_spread":0.26209336022869995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963530719","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40247017,0.004803227,0.56401366,0.0011737805,0.00021242374,0.00036461337,0.0005469081,0.0024083874,0.024006838],"genre_scores_gemma":[0.89333904,0.0004903945,0.10410955,0.00009823898,0.000019096984,0.00019230554,0.00037378116,0.00014842175,0.0012292769],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976826,0.0013161453,0.00012353499,0.00020171505,0.00049963105,0.00017634551],"domain_scores_gemma":[0.98689526,0.010838752,0.000424857,0.000768233,0.00090840296,0.00016456009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041905395,0.0010327342,0.0015380468,0.0010220697,0.00046451937,0.001381414,0.0013674189,0.0016112622,0.0023508563],"category_scores_gemma":[0.018671582,0.0004099491,0.0005591308,0.0012301017,0.0010609967,0.0015429556,0.0011540793,0.0016231562,0.00031413566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017919796,0.0001038177,0.00051579217,0.000104965766,0.000031845608,0.000016600981,0.000018613344,0.9759602,0.00018716312,0.0050930507,0.0004525669,0.017336162],"study_design_scores_gemma":[0.000019535217,0.000054047014,0.000090687965,0.000008243885,0.0000036840147,0.00000445281,0.000011382432,0.9979219,0.00033818983,0.0013988334,0.00014599695,0.00000319306],"about_ca_topic_score_codex":0.008854642,"about_ca_topic_score_gemma":0.0064000115,"teacher_disagreement_score":0.008854642,"about_ca_system_score_codex":0.0015642673,"about_ca_system_score_gemma":0.002264347,"threshold_uncertainty_score":0.022161901},"labels":[],"label_agreement":null},{"id":"W2964471150","doi":"10.3390/en12153017","title":"Special Issue “Intelligent Control in Energy Systems”","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Microgrid; Energy management; HVAC; Computer science; Intelligent control; Control engineering; Operations research; Engineering; Control (management); Artificial intelligence; Energy (signal processing); Air conditioning","score_opus":0.0036594475874315428,"score_gpt":0.1703048158611204,"score_spread":0.16664536827368887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964471150","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018056015,0.026814628,0.0023135857,0.01958073,0.91745836,0.000047214766,0.00014508898,0.00022379111,0.033236153],"genre_scores_gemma":[0.0024312234,0.023963908,0.0010316998,0.010206356,0.86119634,0.00005414832,0.0002464503,0.00022449637,0.100645326],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99753666,0.0002989624,0.00022603504,0.0004227964,0.0013095293,0.00020604784],"domain_scores_gemma":[0.9941281,0.0016446117,0.00036399663,0.00036291732,0.002729047,0.00077138864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021041397,0.0025865077,0.0029312465,0.0029916938,0.0015228449,0.0072164703,0.0018816547,0.004436732,0.052933346],"category_scores_gemma":[0.0047406573,0.00065770635,0.0019092616,0.0019561779,0.0014304365,0.003626975,0.0012108826,0.0069903876,0.026768763],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025304438,0.000019211151,0.000049459228,0.00023191787,0.000020618834,0.000054953463,0.000011990636,0.00015290116,0.00014382953,0.002840806,0.9763965,0.020052573],"study_design_scores_gemma":[0.000011256988,0.000042349053,0.00018893836,0.00019147058,0.000018943514,0.00016730488,0.00001814361,0.00045847465,0.00012625837,0.002725562,0.99604094,0.000010318099],"about_ca_topic_score_codex":0.00084353366,"about_ca_topic_score_gemma":0.0015210848,"teacher_disagreement_score":0.052933346,"about_ca_system_score_codex":0.0018853488,"about_ca_system_score_gemma":0.0018750312,"threshold_uncertainty_score":0.17707968},"labels":[],"label_agreement":null},{"id":"W2964737387","doi":"10.1109/sgc.2018.8777872","title":"Optimal Energy Dispatch of Smart Home Equipped with PV, WT, and ESS Using Load Control under RTP","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controllability; Photovoltaic system; Computer science; Battery (electricity); Automotive engineering; Demand response; Energy storage; Load profile; Electricity; Power (physics); Reliability engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.007808674778158333,"score_gpt":0.19379670570603602,"score_spread":0.1859880309278777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964737387","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27994996,0.0004027303,0.70030445,0.0007708922,0.00014958685,0.0002292151,0.00031749156,0.0004098983,0.017465793],"genre_scores_gemma":[0.9830192,0.00007409637,0.013748647,0.000028795306,0.00002402219,0.000056916437,0.00005613447,0.000027478192,0.0029647711],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997217,0.00010097421,0.000012888584,0.0000624289,0.000038577633,0.00006343185],"domain_scores_gemma":[0.9997017,0.0001290442,0.000060140836,0.000014411517,0.000045646786,0.00004897377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000686703,0.0008509892,0.0014292792,0.0003621743,0.00038501795,0.0012812103,0.00066557387,0.001093917,0.0029492907],"category_scores_gemma":[0.00086378935,0.00054960017,0.0004570353,0.00035750822,0.00046498247,0.0010225743,0.00057498645,0.0007245661,0.00024005782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015380964,0.000033845026,0.00029706678,0.000036629943,0.000020199654,0.00008282134,0.000019605455,0.9888889,0.0010023653,0.0022701793,0.0005772941,0.0066173594],"study_design_scores_gemma":[0.000010597188,0.00002204435,0.00007682062,0.0000011347712,0.000003077338,0.000004196578,0.000009315241,0.99894184,0.000115356954,0.0007305612,0.0000828817,0.0000021844019],"about_ca_topic_score_codex":0.005271608,"about_ca_topic_score_gemma":0.00566969,"teacher_disagreement_score":0.005271608,"about_ca_system_score_codex":0.00097216363,"about_ca_system_score_gemma":0.00075741485,"threshold_uncertainty_score":0.010481834},"labels":[],"label_agreement":null},{"id":"W2966510894","doi":"10.1109/isie.2019.8781186","title":"A Study on Markovian and Deep Learning Based Architectures for Household Appliance-level Load Modeling and Recognition","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Markov process; Markov chain; Hidden Markov model; Machine learning; Artificial intelligence; Architecture; Enhanced Data Rates for GSM Evolution; Recurrent neural network; Artificial neural network; State (computer science); Identification (biology); Deep learning; Energy consumption; Load balancing (electrical power); Distributed computing; Algorithm; Engineering","score_opus":0.04273608138827815,"score_gpt":0.2177953068973649,"score_spread":0.17505922550908676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2966510894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12123506,0.00339189,0.8638724,0.0011192624,0.000116404575,0.00005037543,0.00011032015,0.00037824764,0.009726046],"genre_scores_gemma":[0.93141806,0.002141723,0.059955463,0.00014001346,0.000087772234,0.000045288434,0.00017049836,0.00003172122,0.006009392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997768,0.000064449734,0.000013587711,0.000066791814,0.000046024797,0.000032408905],"domain_scores_gemma":[0.9993692,0.0003727399,0.000044248383,0.00007055594,0.00012009412,0.000023180415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086518924,0.00037467844,0.000254145,0.0002485344,0.00019036322,0.00068347726,0.0005504466,0.0005010869,0.0014345736],"category_scores_gemma":[0.0021192338,0.00023715476,0.00038227934,0.00036461215,0.00030241068,0.0012467555,0.00040243208,0.000857913,0.0002245921],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021455115,0.00018541241,0.008659207,0.00022043903,0.00010966334,0.00020274412,0.00023793579,0.5703853,0.011656455,0.06781824,0.0028693734,0.33744064],"study_design_scores_gemma":[0.0000012079322,0.000036083162,0.0006263348,0.0000071475297,0.0000072399184,0.000023405228,0.000011001218,0.99423814,0.0009871637,0.0032951275,0.0007634189,0.0000036316171],"about_ca_topic_score_codex":0.0053965705,"about_ca_topic_score_gemma":0.004804622,"teacher_disagreement_score":0.0053965705,"about_ca_system_score_codex":0.0005770483,"about_ca_system_score_gemma":0.00059415476,"threshold_uncertainty_score":0.010730326},"labels":[],"label_agreement":null},{"id":"W2967423608","doi":"10.1145/3342428.3343033","title":"Electric Device Recognition and Recommendation in Real-Time Based on Complex Event Processing for Smart Homes","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Ambient intelligence; Context (archaeology); Computer science; Event (particle physics); Activity recognition; Power consumption; Home automation; Order (exchange); Recommender system; Consumption (sociology); Real-time computing; Embedded system; Power (physics); Human–computer interaction; Artificial intelligence; Telecommunications; World Wide Web; Business","score_opus":0.026410219747221544,"score_gpt":0.24127508697708405,"score_spread":0.2148648672298625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967423608","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32075378,0.0019678643,0.6605028,0.0004859939,0.0003774885,0.00024985062,0.0007962933,0.0100364955,0.004829496],"genre_scores_gemma":[0.88757944,0.0004785253,0.10734483,0.00017829503,0.00011586731,0.00008264419,0.0005854083,0.000046938636,0.003588204],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996779,0.000057885936,0.000031296826,0.00010211138,0.000094876756,0.000035903242],"domain_scores_gemma":[0.99974316,0.0000888471,0.00003058821,0.000045886165,0.00007249884,0.000018969355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003547044,0.00047468502,0.00062289834,0.0006305388,0.00018522592,0.00043610903,0.00046183803,0.00050058897,0.0017923027],"category_scores_gemma":[0.0006619305,0.00017519211,0.00026704045,0.00044650518,0.00013239044,0.000538627,0.00023823486,0.00038765973,0.0009844106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012440353,0.0009005704,0.008052819,0.0002142066,0.00012970595,0.0005087282,0.00013594558,0.024815539,0.08445829,0.000760754,0.0078834,0.8708961],"study_design_scores_gemma":[0.0000956198,0.0003587468,0.016587889,0.00001771307,0.000083692845,0.0004034757,0.00007897038,0.94597423,0.03166948,0.0010861119,0.0036065737,0.000037487338],"about_ca_topic_score_codex":0.0029840728,"about_ca_topic_score_gemma":0.004784901,"teacher_disagreement_score":0.0029840728,"about_ca_system_score_codex":0.00020355424,"about_ca_system_score_gemma":0.00018342726,"threshold_uncertainty_score":0.0059958696},"labels":[],"label_agreement":null},{"id":"W2968064525","doi":"10.5539/eer.v9n2p1","title":"Dynamic Electricity Pricing – Modeling Manufacturer Response and an Application to Cement Processing","year":2019,"lang":"en","type":"article","venue":"Energy and Environment Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Flexibility (engineering); Dynamic pricing; Electricity pricing; Production schedule; Environmental economics; Incentive; Production (economics); Scheduling (production processes); Electricity generation; Electricity retailing; Schedule; Industrial organization; Microeconomics; Computer science; Business; Economics; Operations management","score_opus":0.011559981711546931,"score_gpt":0.2546693205886584,"score_spread":0.24310933887711145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968064525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58720684,0.0008945555,0.3787881,0.0019360479,0.00020938019,0.00020453421,0.00078247994,0.0003445797,0.029633489],"genre_scores_gemma":[0.98188573,0.00025684058,0.011658117,0.00006691448,0.000029465416,0.0000675453,0.00013174613,0.000029485542,0.005874163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994886,0.0002442821,0.00001952434,0.000083492385,0.00007278675,0.00009124891],"domain_scores_gemma":[0.9980142,0.0014124159,0.00022983554,0.00006469104,0.00020203897,0.00007684112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012453644,0.0007811837,0.00077581784,0.00052130973,0.0005089845,0.001345788,0.0014290361,0.0025436468,0.0038870755],"category_scores_gemma":[0.0035372307,0.0005735144,0.0011426655,0.00097334204,0.00061449915,0.0011617341,0.00069259485,0.001482013,0.00032344603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019032464,0.000035974233,0.0005682698,0.000011025583,0.000009947559,0.000040545438,0.000016450662,0.9930032,0.00017222193,0.004701057,0.0001496781,0.0012725005],"study_design_scores_gemma":[0.0000028596096,0.000007712719,0.00012298724,9.629124e-7,0.0000027217557,0.0000043077102,0.000007184891,0.99901485,0.00002949791,0.00068999693,0.00011424708,0.0000026419789],"about_ca_topic_score_codex":0.0340893,"about_ca_topic_score_gemma":0.019859467,"teacher_disagreement_score":0.0340893,"about_ca_system_score_codex":0.0015503406,"about_ca_system_score_gemma":0.0013316687,"threshold_uncertainty_score":0.06778175},"labels":[],"label_agreement":null},{"id":"W2969449376","doi":"10.11591/ijai.v8.i3.pp292-298","title":"Multi-verse optimization based evolutionary programming technique for power scheduling in loss minimization scheme","year":2019,"lang":"en","type":"article","venue":"IAES International Journal of Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec","funders":"Ministry of Education, India","keywords":"Computer science; Scheduling (production processes); Electric power system; Reliability engineering; Real-time computing; Distributed computing; Power (physics); Mathematical optimization; Engineering; Mathematics","score_opus":0.020876728755271055,"score_gpt":0.27988518109635463,"score_spread":0.25900845234108355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969449376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02465704,0.0002898156,0.9647379,0.00022973708,0.00005353161,0.00007040504,0.0000386795,0.00017176213,0.009751217],"genre_scores_gemma":[0.46462473,0.00043164156,0.5195744,0.00014426248,0.000036651043,0.00031112815,0.00013342022,0.00015596159,0.014587886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999783,0.00008120676,0.000009059661,0.000027644233,0.00007080015,0.00002838169],"domain_scores_gemma":[0.99976176,0.00013736592,0.000022066924,0.000014719955,0.0000497071,0.0000143641655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000626584,0.0005527742,0.0005512454,0.0005277082,0.00038440272,0.0007019095,0.00075729185,0.00062144763,0.0039779204],"category_scores_gemma":[0.0010117153,0.00028164955,0.00069430785,0.0005499162,0.0004127519,0.00046547258,0.0006002168,0.00096009445,0.000364359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038300757,0.00004445364,0.0003669735,0.000057163772,0.000023535551,0.00008760277,0.000068694004,0.93577677,0.0027047358,0.017723152,0.00095469557,0.042153895],"study_design_scores_gemma":[0.0000042169027,0.000022320482,0.000056235083,0.000004870425,0.0000038885737,0.000013537992,0.0000061702895,0.99732095,0.00033262832,0.001644591,0.00058845966,0.000002118482],"about_ca_topic_score_codex":0.002489365,"about_ca_topic_score_gemma":0.0024527025,"teacher_disagreement_score":0.0039779204,"about_ca_system_score_codex":0.000664177,"about_ca_system_score_gemma":0.0005901758,"threshold_uncertainty_score":0.013307512},"labels":[],"label_agreement":null},{"id":"W2969550468","doi":"10.1109/tia.2019.2936330","title":"Bottom-Up Load Forecasting With Markov-Based Error Reduction Method for Aggregated Domestic Electric Water Heaters","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Siemens","keywords":"Mean squared error; Mean absolute percentage error; Computer science; Benchmark (surveying); Markov chain; Particle swarm optimization; Mathematical optimization; Electricity; Electrical load; Approximation error; Reduction (mathematics); Statistics; Algorithm; Engineering; Mathematics; Voltage; Machine learning","score_opus":0.016601417690014407,"score_gpt":0.24615112447263568,"score_spread":0.22954970678262127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969550468","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09215412,0.00023826284,0.9052396,0.00014818899,0.000069758484,0.000028921437,0.00006367381,0.00072627363,0.0013312955],"genre_scores_gemma":[0.9023414,0.00017529447,0.09550832,0.000054256434,0.00004414093,0.00004440638,0.00018734355,0.00004097491,0.0016038495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969065,0.000053005835,0.000022010858,0.00007011894,0.00012626802,0.00003786914],"domain_scores_gemma":[0.9995609,0.00016706018,0.000048894497,0.000039668197,0.00016241873,0.000021064849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005372369,0.0004683406,0.00069929817,0.00039459817,0.00031113598,0.0004075261,0.0005799198,0.00030113183,0.00059391814],"category_scores_gemma":[0.001253381,0.0002911307,0.0007032972,0.0003361752,0.00020191523,0.0005429633,0.00036849795,0.0006864432,0.00015487216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001733533,0.00005249216,0.0021873883,0.000050955958,0.000047720696,0.00006424278,0.000082221064,0.85213935,0.008192451,0.0019508555,0.0008640875,0.13419485],"study_design_scores_gemma":[0.0000015503069,0.0000073458614,0.00018237282,9.3618473e-7,0.0000026551036,0.000002362498,0.0000020345428,0.999015,0.0005800931,0.00014374197,0.000059167036,0.0000025987033],"about_ca_topic_score_codex":0.0139697855,"about_ca_topic_score_gemma":0.009508194,"teacher_disagreement_score":0.0139697855,"about_ca_system_score_codex":0.00039160662,"about_ca_system_score_gemma":0.00068503973,"threshold_uncertainty_score":0.027776957},"labels":[],"label_agreement":null},{"id":"W2969858312","doi":"10.1016/j.apenergy.2022.119160","title":"Shared community energy storage allocation and optimization","year":2022,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":107,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of Waterloo","funders":"","keywords":"Energy storage; Distributed generation; Computer science; Environmental economics; Integer programming; Electricity; Software deployment; Engineering; Renewable energy; Electrical engineering; Economics; Operating system","score_opus":0.00871000878942107,"score_gpt":0.17432631014287028,"score_spread":0.1656163013534492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969858312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22615041,0.0005095063,0.72969055,0.001441207,0.00035837654,0.00042218654,0.0007503467,0.001256426,0.039421055],"genre_scores_gemma":[0.96457756,0.00006089759,0.028458102,0.00006422113,0.000048112295,0.0001006098,0.00018843194,0.00007531533,0.00642681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999193,0.00025161734,0.000025229601,0.0001298204,0.00020343545,0.00019687314],"domain_scores_gemma":[0.998694,0.0004227161,0.00006960924,0.00022563378,0.00044664883,0.0001412756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012943761,0.00059977133,0.0013991372,0.00061148073,0.00095150794,0.0015440396,0.0018510495,0.0010965066,0.012175153],"category_scores_gemma":[0.0036768191,0.00033132633,0.00065936823,0.0015048805,0.0005343288,0.0019920128,0.0024258061,0.0007076278,0.00079577084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038439216,0.00021826959,0.00088819594,0.000081191516,0.000074758485,0.00008698882,0.000058406207,0.89854896,0.0010705922,0.016838988,0.0069457456,0.074803464],"study_design_scores_gemma":[0.000027790455,0.000035961395,0.00016663369,0.0000032354608,0.000008569101,0.00001895103,0.000038749793,0.98772985,0.00035361556,0.010855934,0.00075589644,0.0000047875005],"about_ca_topic_score_codex":0.006012093,"about_ca_topic_score_gemma":0.013974864,"teacher_disagreement_score":0.012175153,"about_ca_system_score_codex":0.0011782566,"about_ca_system_score_gemma":0.002559759,"threshold_uncertainty_score":0.04072994},"labels":[],"label_agreement":null},{"id":"W2972441210","doi":"10.4236/sgre.2019.107012","title":"Towards Optimal Planning and Scheduling in Smart Homes","year":2019,"lang":"en","type":"article","venue":"Smart Grid and Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Computer science; Scheduling (production processes); Energy management; Operations research; Distributed computing; Energy (signal processing); Engineering; Mathematics; Control (management); Artificial intelligence","score_opus":0.006435460962188067,"score_gpt":0.1923426022533912,"score_spread":0.18590714129120314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972441210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03311285,0.00047477084,0.96037847,0.00053910393,0.00004613336,0.00005336071,0.00007383052,0.00024309913,0.005078456],"genre_scores_gemma":[0.5721253,0.0008541563,0.42334196,0.00016406417,0.00006903912,0.00016022346,0.00019269106,0.0001328527,0.0029597797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940884,0.00024650918,0.000022230832,0.000100845435,0.00014066769,0.0000808545],"domain_scores_gemma":[0.9989479,0.00073973474,0.000093651484,0.000054761105,0.00011855457,0.00004542159],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012105302,0.00085909996,0.00088487734,0.00071285927,0.0005492043,0.0010219855,0.0006394806,0.0008925875,0.0020142847],"category_scores_gemma":[0.0035698593,0.0008215819,0.00047806025,0.0011632766,0.0010684396,0.0015061249,0.00092387537,0.0010357783,0.0002509656],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021437305,0.000017496619,0.0001516097,0.000028016744,0.000008985518,0.000016537242,0.0000327286,0.9779142,0.00022998422,0.012583565,0.0004906115,0.00850463],"study_design_scores_gemma":[0.000008907,0.000009280922,0.000038701797,0.0000044255967,0.0000023654266,0.0000044838066,0.000026696816,0.9773742,0.00015946726,0.021795787,0.00057327957,0.0000024738943],"about_ca_topic_score_codex":0.010672913,"about_ca_topic_score_gemma":0.010575607,"teacher_disagreement_score":0.010672913,"about_ca_system_score_codex":0.0012473648,"about_ca_system_score_gemma":0.0022774087,"threshold_uncertainty_score":0.021221578},"labels":[],"label_agreement":null},{"id":"W2973797128","doi":"10.1016/j.jup.2019.100959","title":"Assessing the impact of residential load profile changes on electricity distribution utility revenues under alternative rate structures","year":2019,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"HEC Montréal","keywords":"Revenue; Photovoltaics; Electricity; Environmental economics; Load shifting; Electricity demand; Total revenue; Distribution (mathematics); Environmental science; Natural resource economics; Photovoltaic system; Electricity generation; Business; Economics; Engineering; Electrical engineering; Finance; Power (physics); Mathematics","score_opus":0.020388123385535948,"score_gpt":0.30757189646737915,"score_spread":0.2871837730818432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2973797128","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9954418,0.00002669895,0.0006941629,0.00014413014,0.000010937702,0.00003051763,0.00025611286,0.000016341799,0.0033793955],"genre_scores_gemma":[0.99924004,0.00002064472,0.00017686049,0.000012315435,0.0000034306263,0.000005611889,0.00008835669,0.0000028839686,0.0004499447],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842525,0.0007854547,0.000052073832,0.00012766276,0.00027741093,0.0003320858],"domain_scores_gemma":[0.99071044,0.0070765773,0.0009234448,0.00029746644,0.0006842645,0.00030779245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032638826,0.00046667858,0.0003914883,0.00046794186,0.00034368556,0.0015943584,0.0007394119,0.0010184865,0.0029593292],"category_scores_gemma":[0.010742574,0.0003129486,0.00059695914,0.0007040969,0.0006278819,0.001713629,0.00054359995,0.0015679215,0.0003135776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0041977754,0.0014013363,0.04376605,0.00008211237,0.0001838324,0.00044485557,0.000088086905,0.92451835,0.003926436,0.008641549,0.0011319928,0.011617652],"study_design_scores_gemma":[0.0003283061,0.004390689,0.09518769,0.000020977952,0.00030990265,0.0000960366,0.00076663797,0.88459414,0.0075617963,0.00550353,0.0011720246,0.000068281195],"about_ca_topic_score_codex":0.0216894,"about_ca_topic_score_gemma":0.020088654,"teacher_disagreement_score":0.0216894,"about_ca_system_score_codex":0.0026887269,"about_ca_system_score_gemma":0.0016256936,"threshold_uncertainty_score":0.043126345},"labels":[],"label_agreement":null},{"id":"W2977424631","doi":"10.11575/prism/37175","title":"Residential Solar PV Standard","year":2019,"lang":"en","type":"article","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental science; Photovoltaic system; Engineering; Electrical engineering","score_opus":0.012397377890607495,"score_gpt":0.23637630642402688,"score_spread":0.22397892853341939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977424631","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08362991,0.000802601,0.017227242,0.0066730985,0.00045224026,0.0010081461,0.0046893903,0.0020888424,0.8834285],"genre_scores_gemma":[0.43830934,0.0008856354,0.025240216,0.003366077,0.00009134827,0.00029885006,0.004455565,0.00028306068,0.52706987],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9954709,0.00018245293,0.00006515357,0.00026075277,0.003486492,0.0005342549],"domain_scores_gemma":[0.99425465,0.0002554174,0.00014162749,0.00034262726,0.0044682287,0.00053740427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017139242,0.00022522964,0.00019788038,0.0008233175,0.0044861822,0.0024250618,0.001816529,0.0009538406,0.019139508],"category_scores_gemma":[0.0027362262,0.00030938635,0.00030382499,0.0012157584,0.0012410359,0.0007294251,0.0009277601,0.0011142285,0.0025316325],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035301413,0.0004521486,0.05628103,0.0006103721,0.00002966066,0.0011312525,0.0043446897,0.006007931,0.026018525,0.15202959,0.43094078,0.32180098],"study_design_scores_gemma":[0.000033017266,0.00008713462,0.061735295,0.00013651996,0.000016450726,0.0002524854,0.0023306287,0.0013139914,0.0058864327,0.0023582925,0.92578745,0.00006224945],"about_ca_topic_score_codex":0.88465536,"about_ca_topic_score_gemma":0.95412505,"teacher_disagreement_score":0.88465536,"about_ca_system_score_codex":0.018636871,"about_ca_system_score_gemma":0.064690135,"threshold_uncertainty_score":0.2320478},"labels":[],"label_agreement":null},{"id":"W2979426993","doi":"10.1049/iet-rpg.2019.0583","title":"Optimal scheduling of bidirectional energy conversion units in energy and ancillary service markets for system restoration within MCESs","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Scheduling (production processes); Computer science; Energy (signal processing); Operations research; Distributed computing; Mathematical optimization; Engineering; Physics; Mathematics","score_opus":0.011775429246855937,"score_gpt":0.18988286088962614,"score_spread":0.1781074316427702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979426993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16880774,0.00046123666,0.8086925,0.00060323585,0.00012235287,0.00019596363,0.0002093244,0.00016307486,0.02074459],"genre_scores_gemma":[0.97573507,0.00017874497,0.018990062,0.000038233655,0.000015702017,0.000084879044,0.000045912864,0.000028517761,0.0048829243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996327,0.00015207655,0.000009163626,0.000056477027,0.00006118812,0.00008837329],"domain_scores_gemma":[0.9995765,0.00020823503,0.0000809037,0.000017543704,0.00005909712,0.00005765815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009539766,0.00073899596,0.0009149196,0.0003551475,0.00056107674,0.0015144857,0.00083173584,0.0009983074,0.0031153685],"category_scores_gemma":[0.0016623574,0.00046318027,0.0006419148,0.0004530572,0.00081328524,0.0012169223,0.0008078057,0.001123207,0.00019017435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025848418,0.000012269144,0.00011516855,0.000010313589,0.000004549443,0.000028827635,0.000010720346,0.9906465,0.00028050714,0.0072809,0.0001844915,0.0013999854],"study_design_scores_gemma":[0.0000034436198,0.000007937101,0.000028684071,0.0000013486593,0.0000016893792,0.000002592543,0.0000067198007,0.998618,0.00007122697,0.0011447042,0.0001119876,0.0000015846355],"about_ca_topic_score_codex":0.013363306,"about_ca_topic_score_gemma":0.012388217,"teacher_disagreement_score":0.013363306,"about_ca_system_score_codex":0.0018072915,"about_ca_system_score_gemma":0.002074094,"threshold_uncertainty_score":0.026571035},"labels":[],"label_agreement":null},{"id":"W2979571956","doi":"10.1109/ccece.2019.8861813","title":"A Methodology to Forecast the Control Capacity of a Population of Thermostatically Controlled Appliances in a Demand-Side Management","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Controllability; Computer science; Population; Reliability (semiconductor); Electric power system; Demand response; Control theory (sociology); Grid; Estimation; Renewable energy; Control (management); Wind power; Reliability engineering; Interval (graph theory); Power (physics); Simulation; Engineering; Mathematics; Electricity","score_opus":0.023932593989673002,"score_gpt":0.24023929406604153,"score_spread":0.2163067000763685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979571956","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018183444,0.00009598985,0.979864,0.000108279964,0.000029426317,0.00003535731,0.00008664818,0.00009357089,0.0015032125],"genre_scores_gemma":[0.91841775,0.00023600763,0.078492865,0.000047056397,0.000044901997,0.00020772,0.00016683832,0.00002704952,0.00235983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998184,0.000046927347,0.0000100804,0.0000510293,0.00005054207,0.00002304686],"domain_scores_gemma":[0.99952006,0.00024168908,0.00009779614,0.000023899694,0.000095106,0.000021506246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063535623,0.0005017149,0.00048818163,0.00030709946,0.00025735635,0.0006291308,0.00072079647,0.0007336438,0.001498326],"category_scores_gemma":[0.0015982563,0.00027211907,0.00048186074,0.00032941136,0.00045094313,0.00078051287,0.00038670728,0.0007795031,0.00015557981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005730419,0.000005469058,0.00017498758,0.000009293054,0.000004886347,0.00001128102,0.0000094067955,0.99372125,0.0006162448,0.0027454544,0.00007956064,0.0026164951],"study_design_scores_gemma":[0.0000013350442,0.000007828612,0.00004951932,0.0000011182735,0.0000016674945,0.0000033587535,0.0000018264326,0.9990872,0.00012918719,0.0006220525,0.00009321116,0.0000016746371],"about_ca_topic_score_codex":0.0064778826,"about_ca_topic_score_gemma":0.004268869,"teacher_disagreement_score":0.0064778826,"about_ca_system_score_codex":0.0006328781,"about_ca_system_score_gemma":0.0008556385,"threshold_uncertainty_score":0.012880385},"labels":[],"label_agreement":null},{"id":"W2979746138","doi":"10.1109/ccece.2019.8861523","title":"ETX: A Flexible Simulation Framework for Design of Transactive Energy Systems","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Transactive memory; Computer science; Grid; Electricity; Energy (signal processing); Distributed computing; Risk analysis (engineering); Knowledge management; Engineering; Business","score_opus":0.020315682793901627,"score_gpt":0.23101468315871823,"score_spread":0.2106990003648166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979746138","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002598721,0.00009536212,0.9900663,0.00014899096,0.000058965208,0.00011169,0.00023995306,0.0012693045,0.005410764],"genre_scores_gemma":[0.21925572,0.0006605244,0.76877224,0.00018720586,0.00006402098,0.0016892095,0.0010432417,0.00082573894,0.007502005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993787,0.00029344024,0.00004804234,0.000066820256,0.00015668335,0.00005640891],"domain_scores_gemma":[0.9991322,0.0004863206,0.00006776977,0.00010238017,0.00013215397,0.00007906771],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016884668,0.0011173029,0.00090091734,0.0006132328,0.00079527625,0.001657407,0.0026510581,0.0015369108,0.009506331],"category_scores_gemma":[0.003020424,0.0006807998,0.0015529668,0.0005156745,0.0010833627,0.0014336734,0.0022808502,0.0018612365,0.0009989785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003764895,0.000024370827,0.00030660987,0.000078606325,0.000038040147,0.000084814266,0.00010102891,0.9324502,0.00090918003,0.0563475,0.0013409678,0.008281092],"study_design_scores_gemma":[0.000027470847,0.000015734193,0.000033817636,0.000019234301,0.000008177065,0.000019192763,0.000016439924,0.9737907,0.00036313152,0.016176831,0.009520468,0.000008866967],"about_ca_topic_score_codex":0.009411314,"about_ca_topic_score_gemma":0.00830048,"teacher_disagreement_score":0.009506331,"about_ca_system_score_codex":0.0009091469,"about_ca_system_score_gemma":0.0018237577,"threshold_uncertainty_score":0.03180188},"labels":[],"label_agreement":null},{"id":"W2979814825","doi":"10.1049/iet-stg.2019.0019","title":"Two stages K‐means and PSO‐based method for optimal allocation of multiple parallel DRPs application &amp; deployment","year":2019,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Library science; Engine department; Art history; Engineering; Computer science; Art; Mechanical engineering","score_opus":0.013492751901506618,"score_gpt":0.2593642453624749,"score_spread":0.24587149346096826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979814825","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016230203,0.00021957085,0.9789038,0.000103242855,0.000050761315,0.00009912137,0.000045198627,0.0005159992,0.0038321842],"genre_scores_gemma":[0.4114461,0.0002303017,0.5792632,0.00007648067,0.000031453164,0.00034167658,0.00017846694,0.00013798565,0.008294373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960166,0.00010503754,0.000028120776,0.0000901643,0.00011768998,0.000057246692],"domain_scores_gemma":[0.99967134,0.000116985684,0.000043876873,0.0000245119,0.00011948043,0.000023741622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051116437,0.00080271286,0.00087650813,0.0006212208,0.0005656918,0.0007780063,0.00090246083,0.0008639165,0.0027193036],"category_scores_gemma":[0.0010569808,0.00052794616,0.00084578444,0.0006987679,0.00035327522,0.00061561004,0.0005891757,0.00063637435,0.00058017106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001472053,0.00006238648,0.000603216,0.00012581522,0.00006205467,0.00006528272,0.00010839745,0.8841746,0.0039826385,0.003331024,0.0018323131,0.10550519],"study_design_scores_gemma":[0.000007637379,0.000025493888,0.00015570411,0.00000421682,0.000007073667,0.000011869142,0.000013348934,0.9980349,0.00060599216,0.00046927814,0.00065832044,0.000006272411],"about_ca_topic_score_codex":0.012017039,"about_ca_topic_score_gemma":0.011699558,"teacher_disagreement_score":0.012017039,"about_ca_system_score_codex":0.0006025654,"about_ca_system_score_gemma":0.001413779,"threshold_uncertainty_score":0.02389419},"labels":[],"label_agreement":null},{"id":"W2980156932","doi":"10.1049/iet-rpg.2019.0345","title":"Stochastic PV model for power system planning applications","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Stochastic modelling; Photovoltaic system; Electric power system; Power (physics); Engineering; Electrical engineering; Mathematics; Physics; Statistics","score_opus":0.015036749008502161,"score_gpt":0.21745413008702238,"score_spread":0.20241738107852023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980156932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0060832105,0.00038435304,0.9765461,0.00031008114,0.0001103509,0.000066462046,0.0008902748,0.00060512853,0.015004022],"genre_scores_gemma":[0.8148428,0.0019329233,0.14867233,0.00025109982,0.00023661397,0.00062939717,0.0027311128,0.00037223106,0.03033144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997118,0.000102686434,0.000013192149,0.000039745308,0.00010765736,0.000024903307],"domain_scores_gemma":[0.9994584,0.0002878257,0.0000707509,0.00004624245,0.000120499964,0.000016292057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042409997,0.0006158037,0.0006273369,0.0002723088,0.00023273852,0.00079372077,0.0010103071,0.00078092807,0.007940623],"category_scores_gemma":[0.0017028222,0.0003218631,0.00065680494,0.00093370024,0.00023867573,0.0005535748,0.0004709173,0.0012502255,0.0015623419],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009077367,0.0000054576326,0.00012553608,0.00002265025,0.000006324194,0.000028224658,0.0000058708074,0.98758894,0.00020878324,0.006827509,0.0010157598,0.0041558864],"study_design_scores_gemma":[0.0000025887834,0.0000055541495,0.000055694174,0.000003672301,0.000001918824,0.000010080185,0.0000024669928,0.99437237,0.00007486184,0.0039164755,0.0015518001,0.000002442953],"about_ca_topic_score_codex":0.008391032,"about_ca_topic_score_gemma":0.00689265,"teacher_disagreement_score":0.008391032,"about_ca_system_score_codex":0.0004611555,"about_ca_system_score_gemma":0.0007915839,"threshold_uncertainty_score":0.026564002},"labels":[],"label_agreement":null},{"id":"W2980196141","doi":"10.1109/sege.2019.8859787","title":"A Network of BIMGs Participating in Demand Response Using EVs and HVAC Units","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"HVAC; Photovoltaic system; Apartment; Renewable energy; Demand response; Automotive engineering; Building automation; Electric power system; Building management system; Grid; Air conditioning; Computer science; Engineering; Architectural engineering; Control (management); Power (physics); Electrical engineering; Electricity; Civil engineering","score_opus":0.02313553897633725,"score_gpt":0.21912437031745735,"score_spread":0.1959888313411201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980196141","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7920982,0.00020023031,0.19078417,0.0003544756,0.000053377615,0.00020266592,0.0005155153,0.0006941073,0.015097256],"genre_scores_gemma":[0.979884,0.000037816164,0.01559409,0.000018122779,0.00000848931,0.000033378317,0.00017756116,0.0000065143577,0.004239983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997397,0.000056557998,0.0000104938945,0.00010707059,0.00003581894,0.00005024221],"domain_scores_gemma":[0.99981576,0.000034717585,0.000027162709,0.000027257895,0.000039406306,0.00005569367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022936823,0.0003218987,0.00031370317,0.00025974849,0.0007797167,0.0006082565,0.0009834751,0.00036559804,0.0060616946],"category_scores_gemma":[0.00035130847,0.00014258704,0.00021653475,0.00048724015,0.000274445,0.00058517477,0.000830739,0.0002672921,0.0003360661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010216393,0.0005546281,0.044067822,0.00026575485,0.00018311702,0.0015747024,0.0006110185,0.7058896,0.03708959,0.030643921,0.0065591084,0.17153916],"study_design_scores_gemma":[0.000042514865,0.00020157117,0.008505253,0.000014940356,0.000051094965,0.00020329999,0.00048943993,0.9722568,0.0062530246,0.004153944,0.007809151,0.000019004923],"about_ca_topic_score_codex":0.016512,"about_ca_topic_score_gemma":0.024801735,"teacher_disagreement_score":0.016512,"about_ca_system_score_codex":0.0012293602,"about_ca_system_score_gemma":0.0008584841,"threshold_uncertainty_score":0.032831788},"labels":[],"label_agreement":null},{"id":"W2980217178","doi":"10.1109/sege.2019.8859885","title":"Operational Optimization of a Remote Off-Grid Hybrid Renewable Energy System in Northern Canada","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Particle swarm optimization; Renewable energy; Computer science; Grid; Energy management; Energy management system; Optimization problem; Mathematical optimization; Operations research; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.0029601695223000213,"score_gpt":0.14444908798964834,"score_spread":0.14148891846734832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980217178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96711886,0.00022345179,0.014736733,0.0002403629,0.000023941015,0.00012716536,0.00031006525,0.00014771993,0.017071743],"genre_scores_gemma":[0.9959858,0.00005162426,0.0010211981,0.00001132772,0.0000014705175,0.000012894317,0.00008286862,0.000006348896,0.0028264504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983776,0.000022219532,0.0000049528007,0.000025099682,0.000043431024,0.000066497996],"domain_scores_gemma":[0.99987483,0.000033908695,0.00001371141,0.0000041283142,0.00004515909,0.000028260132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025682812,0.0008567178,0.0005891122,0.00026787943,0.0010266271,0.0012111472,0.0006879675,0.0005793651,0.0017986611],"category_scores_gemma":[0.00034596358,0.00020957313,0.00032589535,0.00037945402,0.0005928783,0.00024185276,0.0004715601,0.00043765912,0.00011223014],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001599775,0.00006577897,0.0016314919,0.000037091966,0.000019943964,0.00024643165,0.000039793642,0.9886874,0.00209209,0.0007807712,0.00051867426,0.0057205167],"study_design_scores_gemma":[0.00003071289,0.00008323221,0.0033227638,0.0000035127223,0.000014499995,0.000016021679,0.00017180124,0.9949706,0.000801552,0.00021202647,0.0003600928,0.000013160459],"about_ca_topic_score_codex":0.8321325,"about_ca_topic_score_gemma":0.8277451,"teacher_disagreement_score":0.16786748,"about_ca_system_score_codex":0.0063274284,"about_ca_system_score_gemma":0.005834266,"threshold_uncertainty_score":0.3377121},"labels":[],"label_agreement":null},{"id":"W2980645258","doi":"10.3386/w26385","title":"The Electric Gini: Income Redistribution through Energy Prices","year":2019,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Health; University of Alberta","funders":"","keywords":"Redistribution (election); Redistribution of income and wealth; Gini coefficient; Economics; Income distribution; Inequality; Econometrics; Economic inequality; Microeconomics; Mathematics; Political science","score_opus":0.16514139845976614,"score_gpt":0.43433848679856857,"score_spread":0.2691970883388024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980645258","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5493094,0.0034556596,0.1370603,0.010423517,0.00041279252,0.00039657493,0.13702236,0.0015003459,0.1604191],"genre_scores_gemma":[0.9223049,0.0014588444,0.02066544,0.00034441586,0.00017354907,0.0002649643,0.041586068,0.00021427587,0.012987494],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991392,0.00026931052,0.000032183696,0.00016799488,0.0002921281,0.000099173616],"domain_scores_gemma":[0.9984034,0.0006131539,0.00051080005,0.00021186324,0.00019615442,0.00006461316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011616666,0.00043942113,0.00040309498,0.0024730358,0.0003854671,0.0016624549,0.00062661956,0.0004116122,0.006528135],"category_scores_gemma":[0.0066098706,0.00018862328,0.00046291944,0.006164219,0.0007820723,0.0018686461,0.0011429084,0.0010718921,0.00083673827],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029099945,0.00017699144,0.38553947,0.00023981792,0.00026817204,0.00018662226,0.00073073374,0.049236476,0.00049054367,0.31456634,0.12599821,0.1222756],"study_design_scores_gemma":[0.000097491225,0.00013124447,0.4310564,0.00017470306,0.00014553076,0.0005286182,0.0011532954,0.12139914,0.002545295,0.21413083,0.22849432,0.00014316144],"about_ca_topic_score_codex":0.017901871,"about_ca_topic_score_gemma":0.014660933,"teacher_disagreement_score":0.017901871,"about_ca_system_score_codex":0.0016148054,"about_ca_system_score_gemma":0.0008078395,"threshold_uncertainty_score":0.035595357},"labels":[],"label_agreement":null},{"id":"W2982003591","doi":"10.25439/rmt.27596010","title":"Modelling the factors that influence the adoption intention of a residential energy management information system (REIMS)","year":2019,"lang":"en","type":"dissertation","venue":"RMIT Research Repository (RMIT University Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Energy (signal processing); Energy management; Information system; Knowledge management; Environmental economics; Computer science; Engineering; Economics","score_opus":0.014467322726210449,"score_gpt":0.1943965992173545,"score_spread":0.17992927649114404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982003591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99295855,0.00007675358,0.0037330787,0.00020220719,0.000011465457,0.00013495078,0.00016043847,0.00002459423,0.002697864],"genre_scores_gemma":[0.99498296,0.00010756943,0.003004555,0.000025450105,0.000006909994,0.0001404685,0.00021933974,0.000005806736,0.0015069338],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989114,0.00052390486,0.00007419257,0.00012625374,0.0001389398,0.00022532654],"domain_scores_gemma":[0.99158245,0.0063983127,0.0008553376,0.00022427803,0.00063851033,0.00030103017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027932327,0.0005812739,0.00034288917,0.0011291954,0.00045936767,0.0021994777,0.0006298246,0.0008380082,0.0055782245],"category_scores_gemma":[0.010103316,0.00041282666,0.0015399702,0.00093530864,0.00041736988,0.0013189185,0.000948582,0.0011688353,0.0007867017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006378249,0.002693096,0.9017934,0.00034106037,0.0003880381,0.0003937055,0.004557533,0.03846214,0.0012312699,0.00523272,0.0008708032,0.043398425],"study_design_scores_gemma":[0.00012465799,0.0032106193,0.49904233,0.00039351624,0.00066028273,0.00016314162,0.013067675,0.4737384,0.0019971733,0.0033761414,0.0041196933,0.00010640773],"about_ca_topic_score_codex":0.025734479,"about_ca_topic_score_gemma":0.026571104,"teacher_disagreement_score":0.025734479,"about_ca_system_score_codex":0.0013029061,"about_ca_system_score_gemma":0.0026602838,"threshold_uncertainty_score":0.051169395},"labels":[],"label_agreement":null},{"id":"W2982646473","doi":"10.1109/dasc/picom/cbdcom/cyberscitech.2019.00187","title":"Consumer Segmentation: Improving Energy Demand Management through Households Socio-Analytics","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Demographics; Consumption (sociology); Electricity; Energy consumption; Environmental economics; Smart meter; Tariff; Load management; Analytics; Computer science; Market segmentation; Consumer behaviour; Demand management; Energy management; Business; Energy (signal processing); Marketing; Data science; Economics; Engineering","score_opus":0.010363703403502149,"score_gpt":0.20171450480886496,"score_spread":0.1913508014053628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982646473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7038365,0.00034885984,0.26238248,0.0014108714,0.00008656163,0.00054450356,0.009949837,0.0052318745,0.016208535],"genre_scores_gemma":[0.9478032,0.000098592114,0.046117824,0.00009644637,0.000029574361,0.00010138647,0.0044371067,0.00008295102,0.0012329075],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997466,0.00006592958,0.000014892222,0.0000757716,0.00006640924,0.000030428784],"domain_scores_gemma":[0.9992662,0.00024904945,0.00013279852,0.00011408254,0.00017533466,0.00006249324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005045292,0.00053232745,0.0004970595,0.0013365949,0.00025737082,0.000961336,0.00042377808,0.0003083369,0.001807043],"category_scores_gemma":[0.0016099993,0.00015962704,0.00028055368,0.00118986,0.00012510909,0.0011060596,0.0007558474,0.00032831496,0.00075710966],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007771636,0.001426552,0.31484357,0.00030975643,0.0002135894,0.00022100822,0.002067994,0.0595707,0.0211497,0.007928282,0.014656403,0.57683533],"study_design_scores_gemma":[0.000037825015,0.00022710429,0.1688512,0.000072485265,0.00007877976,0.0001230475,0.0023809131,0.78441226,0.01635079,0.015193507,0.012191867,0.000080198384],"about_ca_topic_score_codex":0.005670233,"about_ca_topic_score_gemma":0.008270393,"teacher_disagreement_score":0.005670233,"about_ca_system_score_codex":0.0004438806,"about_ca_system_score_gemma":0.0004524094,"threshold_uncertainty_score":0.011274457},"labels":[],"label_agreement":null},{"id":"W2983063421","doi":"10.1016/j.mineng.2019.106103","title":"Mine operations as a smart grid resource: Leveraging excess process storage capacity to better enable renewable energy sources","year":2019,"lang":"en","type":"article","venue":"Minerals Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Energy Research and Development; Office of Energy Efficiency; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy","keywords":"Renewable energy; Grid; Flexibility (engineering); Energy storage; Electricity; Smart grid; Peak demand; Computer science; Process engineering; Engineering; Electrical engineering; Power (physics)","score_opus":0.008593114841009209,"score_gpt":0.18646449952637167,"score_spread":0.17787138468536245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983063421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69498885,0.001588752,0.21197401,0.006864243,0.0005622364,0.00015219695,0.0011170151,0.0017835821,0.08096911],"genre_scores_gemma":[0.9907003,0.0003656853,0.00609597,0.00007913312,0.000039075083,0.00000989809,0.00012115701,0.000031337466,0.002557409],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998264,0.000026363912,0.000010797051,0.000036122452,0.0000713531,0.00002888366],"domain_scores_gemma":[0.9995746,0.00010946813,0.00006607526,0.000091048394,0.00011311592,0.00004561109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029036537,0.0002501283,0.00028930095,0.00040581822,0.00039325605,0.0016579705,0.0006465165,0.00057941175,0.0050034877],"category_scores_gemma":[0.00079049886,0.00016401272,0.00022095707,0.0008324971,0.00044644473,0.0031490058,0.0012573944,0.0004421163,0.00078442035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011387799,0.000701307,0.033410653,0.0006423157,0.00021391021,0.0012415261,0.00041604595,0.2970109,0.11133639,0.0819363,0.02255491,0.449397],"study_design_scores_gemma":[0.00010414481,0.00042288005,0.011187306,0.00010066702,0.0001058766,0.0004442247,0.0011582092,0.799692,0.050384544,0.07576235,0.060549118,0.00008862517],"about_ca_topic_score_codex":0.0014965009,"about_ca_topic_score_gemma":0.0043241973,"teacher_disagreement_score":0.0050034877,"about_ca_system_score_codex":0.0004174578,"about_ca_system_score_gemma":0.0008391396,"threshold_uncertainty_score":0.016738296},"labels":[],"label_agreement":null},{"id":"W2984772927","doi":"10.1007/s00202-019-00866-x","title":"An efficient hybrid structure to solve economic-environmental energy scheduling integrated with demand side management programs","year":2019,"lang":"en","type":"article","venue":"Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Greenhouse gas; Scheduling (production processes); Demand side; Demand response; Electricity; Demand management; Energy management; Electricity generation; Smart grid; Computer science; Business; Operations management; Economics; Engineering; Power (physics); Energy (signal processing)","score_opus":0.0014590429454083963,"score_gpt":0.14425221618902104,"score_spread":0.14279317324361265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984772927","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08191525,0.000097591765,0.9085509,0.00021586982,0.00006680629,0.00012733221,0.00012708134,0.0003982171,0.008500857],"genre_scores_gemma":[0.76390094,0.000058319652,0.23084928,0.0000896061,0.000046851455,0.0002571486,0.00020749257,0.000088985726,0.0045013577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975175,0.00007012416,0.00000906868,0.00003947491,0.00006406506,0.0000654674],"domain_scores_gemma":[0.99964905,0.00018085566,0.000029528603,0.00003153395,0.000071427174,0.00003758979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006013042,0.000509517,0.00083152065,0.0004650949,0.00047975316,0.0007145634,0.0012013591,0.000886545,0.004160195],"category_scores_gemma":[0.0010927093,0.00041950072,0.00055663637,0.0005520765,0.0004789714,0.00067828514,0.0009800605,0.00080767594,0.0003178801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008420351,0.00012035179,0.00029970377,0.000028236778,0.000018798542,0.000030376843,0.000026603395,0.9669748,0.0013412079,0.010552667,0.000761618,0.01976143],"study_design_scores_gemma":[0.0000110350575,0.000020178786,0.000032872347,0.0000010969882,0.000002704809,0.0000022604524,0.0000038252474,0.99806327,0.00014507295,0.0015784749,0.00013789475,0.0000013205024],"about_ca_topic_score_codex":0.004960291,"about_ca_topic_score_gemma":0.0074990415,"teacher_disagreement_score":0.004960291,"about_ca_system_score_codex":0.00063822506,"about_ca_system_score_gemma":0.0016773025,"threshold_uncertainty_score":0.013917267},"labels":[],"label_agreement":null},{"id":"W2984883725","doi":"10.3390/en12224351","title":"Supply Side Management vs. Demand Side Management of a Residential Microgrid Equipped with an Electric Vehicle in a Dual Tariff Scheme","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cegep de Sept Iles; Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Energy management; Renewable energy; Demand side; Prosumer; Photovoltaic system; Electric vehicle; Environmental economics; Tariff; Cost of electricity by source; Energy management system; Engineering; Automotive engineering; Electricity generation; Business; Power (physics); Energy (signal processing); Electrical engineering; Economics","score_opus":0.0039105886877790165,"score_gpt":0.1881049497228608,"score_spread":0.18419436103508177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984883725","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70033085,0.000287606,0.25427887,0.00038526455,0.000079037774,0.00018952186,0.00024069256,0.0003487051,0.043859363],"genre_scores_gemma":[0.99580413,0.000030398674,0.0024104433,0.0000074801624,0.0000060782736,0.000009694499,0.000019531575,0.000005167067,0.001707197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998516,0.0000434724,0.000008019842,0.000026761632,0.000031889736,0.00003818194],"domain_scores_gemma":[0.9999112,0.000014187246,0.000017124463,0.000012798347,0.00002908736,0.000015559217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023376578,0.00034783327,0.00036239708,0.00021449165,0.00028770752,0.00079066114,0.00046885427,0.0003121048,0.003602379],"category_scores_gemma":[0.00019744012,0.000116258736,0.00025954645,0.00026106485,0.00019566967,0.00049310556,0.00043062808,0.00024712848,0.00030888623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008786562,0.00032274504,0.0032643941,0.00018041032,0.00008595555,0.0004672052,0.00011625627,0.86082065,0.028282173,0.019984331,0.0018122417,0.083785005],"study_design_scores_gemma":[0.000019825733,0.00028884085,0.0014179912,0.000008655756,0.000038566024,0.000094906034,0.00009521245,0.9895962,0.003460337,0.003675882,0.0012930222,0.000010528584],"about_ca_topic_score_codex":0.0017016246,"about_ca_topic_score_gemma":0.0028550013,"teacher_disagreement_score":0.003602379,"about_ca_system_score_codex":0.00051086233,"about_ca_system_score_gemma":0.00038881818,"threshold_uncertainty_score":0.012051165},"labels":[],"label_agreement":null},{"id":"W2986649614","doi":"10.22215/etd/2019-13501","title":"Smart Grid Data Communication and Analytics","year":2019,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Energy management system; Computer science; Grid; Energy consumption; Energy management; Engineering; Database; Telecommunications; Electrical engineering; Energy (signal processing)","score_opus":0.02427260103746643,"score_gpt":0.24576104412226868,"score_spread":0.22148844308480226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2986649614","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03315956,0.0056187445,0.68965584,0.013617468,0.0037508344,0.0012360861,0.021404276,0.06137638,0.17018086],"genre_scores_gemma":[0.78958106,0.006419793,0.10983758,0.0038915123,0.0015480642,0.0007738665,0.034050345,0.0027258524,0.051171906],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99823594,0.0002850108,0.00018294193,0.00028638128,0.0008734823,0.00013632727],"domain_scores_gemma":[0.99676573,0.00047182804,0.00020023424,0.0013924884,0.0010543874,0.00011532023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013853565,0.0008599123,0.00091693643,0.0015990104,0.0005980671,0.004036423,0.0012186506,0.0009591258,0.009484781],"category_scores_gemma":[0.005060894,0.00030693057,0.00036810312,0.0034924652,0.00054127723,0.0034374113,0.0019359916,0.0012332657,0.00840021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049839256,0.00021298247,0.007816387,0.0006770912,0.00015477998,0.00057040347,0.0005184114,0.033232592,0.008097128,0.054778766,0.26960137,0.62384164],"study_design_scores_gemma":[0.00012293557,0.00015053607,0.0055441535,0.0003026533,0.00006491769,0.00053461315,0.00063277164,0.27761865,0.024757514,0.113999754,0.5761546,0.000116898096],"about_ca_topic_score_codex":0.0028644444,"about_ca_topic_score_gemma":0.0011792622,"teacher_disagreement_score":0.009484781,"about_ca_system_score_codex":0.00091588474,"about_ca_system_score_gemma":0.0011889526,"threshold_uncertainty_score":0.0317297},"labels":[],"label_agreement":null},{"id":"W2989516346","doi":"10.1049/iet-gtd.2019.0628","title":"Demand response procurement framework: a new four‐step probabilistic method","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Procurement; Probabilistic logic; Computer science; Operations research; Mathematical optimization; Risk analysis (engineering); Reliability engineering; Business; Mathematics; Engineering; Artificial intelligence; Electrical engineering; Marketing","score_opus":0.019440270987613386,"score_gpt":0.24828888677153607,"score_spread":0.22884861578392268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989516346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00045038553,0.000028213639,0.9980185,0.00008343551,0.0000142262015,0.000030499874,0.000024653214,0.000069822236,0.0012802074],"genre_scores_gemma":[0.1232635,0.00029339115,0.8664766,0.00022276428,0.0001509098,0.00046744503,0.0002207038,0.00023522583,0.008669435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960949,0.001995717,0.00015057572,0.00043079662,0.0011125691,0.00021555407],"domain_scores_gemma":[0.9962465,0.002491048,0.00024106023,0.00037373975,0.0005330201,0.000114595096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059307856,0.00094723544,0.0011141793,0.0013040637,0.0006421494,0.002230666,0.0033147344,0.0015900044,0.010685437],"category_scores_gemma":[0.008728204,0.0011332241,0.0019004632,0.001335474,0.0012482795,0.003462456,0.0024474987,0.002512786,0.0019786807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073743795,0.00011042081,0.00057825097,0.00013422311,0.00008700013,0.00012568024,0.00014697209,0.6131871,0.0013247966,0.30361196,0.0029962738,0.07762361],"study_design_scores_gemma":[0.000016942742,0.000027177826,0.00005253938,0.000010885919,0.000009004756,0.00004160387,0.000013679078,0.95169944,0.00024562335,0.044470172,0.003394437,0.000018460601],"about_ca_topic_score_codex":0.002881292,"about_ca_topic_score_gemma":0.0023977912,"teacher_disagreement_score":0.010685437,"about_ca_system_score_codex":0.0014698816,"about_ca_system_score_gemma":0.0025598444,"threshold_uncertainty_score":0.035746396},"labels":[],"label_agreement":null},{"id":"W2989906032","doi":"10.1109/honet.2019.8907970","title":"Importance Scaling for Elastic Appliance for Automated Power Management in Smart Homes","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Weighting; Energy consumption; Function (biology); Computer science; Power consumption; Energy (signal processing); Energy management; Scaling; Power (physics); Memory management; Embedded system; Mathematical optimization; Engineering; Computer hardware; Mathematics; Electrical engineering","score_opus":0.006223825067454752,"score_gpt":0.2162168221590662,"score_spread":0.20999299709161146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989906032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5341945,0.000333983,0.4609455,0.00018383532,0.000041728745,0.00005900493,0.000014786388,0.00019621634,0.004030485],"genre_scores_gemma":[0.9879019,0.000039698603,0.011789975,0.000009909972,0.00000961577,0.000008099722,0.0000057957864,0.000010891752,0.00022399475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994711,0.00025179275,0.000021707125,0.00005578438,0.00014643333,0.00005323749],"domain_scores_gemma":[0.99849856,0.0009917078,0.00016632365,0.00015744683,0.00013781682,0.00004823038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010626231,0.00040897288,0.00037012043,0.00022015606,0.00024062909,0.00044848892,0.00031432827,0.00020228946,0.0009154179],"category_scores_gemma":[0.004757292,0.00018022912,0.00020924567,0.00028891285,0.00035821684,0.0009837882,0.0004211429,0.0004229552,0.00008797237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004749212,0.00040161193,0.0055868933,0.00011095388,0.000049676568,0.00013581188,0.0002421092,0.7487267,0.026706858,0.016847229,0.00072428054,0.19999288],"study_design_scores_gemma":[0.000016232318,0.0001773613,0.0024457418,0.0000047023614,0.000011168498,0.000039302573,0.000056703702,0.9870695,0.004720578,0.004932526,0.0005169203,0.000009324832],"about_ca_topic_score_codex":0.0009799337,"about_ca_topic_score_gemma":0.0011541041,"teacher_disagreement_score":0.0010626231,"about_ca_system_score_codex":0.00036945526,"about_ca_system_score_gemma":0.00022730675,"threshold_uncertainty_score":0.0056197047},"labels":[],"label_agreement":null},{"id":"W2990083057","doi":"10.1109/tii.2019.2955470","title":"Semisupervised Multilabel Deep Learning Based Nonintrusive Load Monitoring in Smart Grids","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Computer science; Smart grid; Artificial intelligence; Machine learning; Convolutional neural network; Deep learning; Feature (linguistics); Energy consumption; Feature extraction; Representation (politics); Energy (signal processing); Feature learning; Load management; Data mining; Pattern recognition (psychology); Engineering","score_opus":0.019449948693834596,"score_gpt":0.21465790601050377,"score_spread":0.19520795731666918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990083057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18680331,0.00035011466,0.80737,0.00047821237,0.00003392636,0.000058301488,0.00035431466,0.0023834785,0.0021683208],"genre_scores_gemma":[0.9366326,0.00007759892,0.061082017,0.000110706336,0.000019953182,0.00004210603,0.0005049251,0.00005017708,0.0014799255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995703,0.00015385766,0.000017459874,0.00011710535,0.000079105535,0.000062109655],"domain_scores_gemma":[0.99938154,0.000279997,0.00012817621,0.00009159092,0.00008307307,0.000035676236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071168906,0.0005782416,0.0006215539,0.0003982765,0.00027374516,0.0004685558,0.00090353546,0.00053364836,0.00057789695],"category_scores_gemma":[0.0015844392,0.0003233847,0.0003129176,0.000525768,0.00051730574,0.0013024409,0.0007277691,0.00076087436,0.00015528324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033419044,0.0003350725,0.0046578227,0.0000834047,0.000054478973,0.00013444152,0.00011632193,0.79289585,0.0054795127,0.0045113084,0.00345122,0.18794632],"study_design_scores_gemma":[0.0000026345344,0.000009650614,0.00023751105,0.0000011999134,0.0000015992217,0.0000054219513,0.0000053412473,0.9971199,0.0008222901,0.0016877261,0.00010464984,0.0000021578244],"about_ca_topic_score_codex":0.005911091,"about_ca_topic_score_gemma":0.010570324,"teacher_disagreement_score":0.005911091,"about_ca_system_score_codex":0.0008573299,"about_ca_system_score_gemma":0.0006805096,"threshold_uncertainty_score":0.01175338},"labels":[],"label_agreement":null},{"id":"W2990374856","doi":"10.1049/iet-gtd.2019.1135","title":"Layered stochastic approach for residential demand response based on real‐time pricing and incentive mechanism","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Mechanism (biology); Demand response; Incentive; Computer science; Response time; Microeconomics; Operations research; Economics; Engineering; Electricity","score_opus":0.00806998896918508,"score_gpt":0.20382580201762943,"score_spread":0.19575581304844436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990374856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005900408,0.00010376387,0.99159616,0.00018653822,0.000039213348,0.000040811185,0.00003119118,0.00013049656,0.0019714148],"genre_scores_gemma":[0.86792636,0.0004143279,0.12505351,0.00021309535,0.00012310228,0.00025615472,0.00008742272,0.00009245442,0.0058337115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968671,0.0012404582,0.00012569051,0.00052726007,0.0007759596,0.0004634551],"domain_scores_gemma":[0.9983327,0.00080583245,0.00028003866,0.00013775122,0.00029021408,0.00015340009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002932766,0.0013008807,0.0015989131,0.0006208769,0.000573428,0.001845547,0.0028795556,0.0015652926,0.0036425397],"category_scores_gemma":[0.0037541797,0.0008163965,0.0018399276,0.00081509096,0.0010803276,0.0025935476,0.0018740026,0.0019615775,0.00043132465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005051438,0.00007767437,0.00031211466,0.0000667253,0.00006213084,0.00012376571,0.000062631225,0.9172123,0.0015107814,0.07075706,0.00061879825,0.00914549],"study_design_scores_gemma":[0.000006601503,0.00002019322,0.00003960369,0.000002257942,0.0000067222495,0.000013310791,0.000005622974,0.992093,0.0001468177,0.007355416,0.00030226333,0.000008113082],"about_ca_topic_score_codex":0.003942052,"about_ca_topic_score_gemma":0.0029843268,"teacher_disagreement_score":0.003942052,"about_ca_system_score_codex":0.0019612703,"about_ca_system_score_gemma":0.0020443022,"threshold_uncertainty_score":0.015510142},"labels":[],"label_agreement":null},{"id":"W2990628747","doi":"10.1109/tii.2019.2953932","title":"Autonomous Power Management With Double-<i>Q</i>Reinforcement Learning Method","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"St. Francis Xavier University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Frequency scaling; Computer science; Energy consumption; Power management; Q-learning; Operating point; Kernel (algebra); Mobile device; Energy management; Energy (signal processing); Energy minimization; Efficient energy use; Battery (electricity); Power (physics); Embedded system; Real-time computing; Electronic engineering; Electrical engineering; Artificial intelligence; Engineering; Operating system","score_opus":0.017495813571329268,"score_gpt":0.22048472687086848,"score_spread":0.20298891329953922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990628747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019547615,0.00016976485,0.976765,0.00016703329,0.00005290005,0.00009035579,0.0000231749,0.00094537804,0.002238762],"genre_scores_gemma":[0.8715343,0.00007678275,0.12550622,0.00021205633,0.000050134793,0.00017030336,0.00005277991,0.00005228125,0.0023450705],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994917,0.00012336294,0.000037148915,0.00012588859,0.00014523596,0.0000766545],"domain_scores_gemma":[0.99892884,0.00052871904,0.0001330679,0.000098033845,0.0002469389,0.000064429165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009748483,0.00059674017,0.0008207948,0.00032824892,0.00035804644,0.00077940064,0.0011547782,0.000766631,0.0022020556],"category_scores_gemma":[0.0022887406,0.00027192172,0.00034230974,0.00026342788,0.00064731314,0.0006037125,0.00071874994,0.0007687291,0.0003751361],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026648366,0.00020742905,0.0020489418,0.00008617154,0.000052137537,0.00014277344,0.00011408267,0.72581375,0.0062559796,0.00581206,0.0020737478,0.25712648],"study_design_scores_gemma":[0.000016554708,0.000027733175,0.00007050504,0.0000023722198,0.0000034911066,0.000010538439,0.0000022391139,0.9986873,0.00037794546,0.0005941856,0.00020421867,0.00000298664],"about_ca_topic_score_codex":0.0065421746,"about_ca_topic_score_gemma":0.0043408507,"teacher_disagreement_score":0.0065421746,"about_ca_system_score_codex":0.0005566112,"about_ca_system_score_gemma":0.0010744465,"threshold_uncertainty_score":0.013008177},"labels":[],"label_agreement":null},{"id":"W2991146912","doi":"10.1109/eem.2019.8916571","title":"Integrating Demand Response in Regional Electricity Markets: An Agent-Based Simulation","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Revenue; Renewable energy; Consumption (sociology); Environmental economics; Demand response; Supply and demand; Mains electricity; Quarter (Canadian coin); Industrial organization; Business; Natural resource economics; Economics; Microeconomics; Engineering; Finance","score_opus":0.01182086904819864,"score_gpt":0.230589087086767,"score_spread":0.21876821803856836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2991146912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8603531,0.00030581545,0.11098601,0.0009016904,0.0001017783,0.00018682389,0.000998609,0.0003734315,0.02579277],"genre_scores_gemma":[0.9851184,0.00010206475,0.011968719,0.00006901556,0.000010967816,0.00008795327,0.0002213736,0.0000287633,0.0023927465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961686,0.00020709357,0.000014929876,0.000048701073,0.000042581178,0.000069856265],"domain_scores_gemma":[0.99852836,0.0010346058,0.000112654714,0.000059380945,0.0001319871,0.00013300935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068934937,0.00061609835,0.0009704655,0.00045268747,0.0005953594,0.0014100275,0.0012558844,0.0017638801,0.0044304705],"category_scores_gemma":[0.0022250165,0.00042292435,0.00078400783,0.00054239976,0.0007044855,0.00095203397,0.0011182358,0.0010960089,0.0002804237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046330726,0.0000345925,0.00061390945,0.000007442994,0.000016972479,0.000032700522,0.00002117281,0.99726653,0.00011073062,0.0012587995,0.00009988111,0.0004909253],"study_design_scores_gemma":[0.000025262554,0.000018321201,0.00010918499,0.0000019018877,0.0000061344585,0.000003738728,0.000018835372,0.99911934,0.000058374724,0.00045513167,0.00018011693,0.0000035476241],"about_ca_topic_score_codex":0.030736675,"about_ca_topic_score_gemma":0.016454125,"teacher_disagreement_score":0.030736675,"about_ca_system_score_codex":0.0011313522,"about_ca_system_score_gemma":0.0011471059,"threshold_uncertainty_score":0.061115563},"labels":[],"label_agreement":null},{"id":"W2992856267","doi":"10.1049/iet-gtd.2019.1343","title":"Framework for optimizing the demand contracted by large customers","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Demand management; Demand patterns; Work (physics); Demand forecasting; Microeconomics; Market demand schedule; Economics; Demand curve; Operations research; Computer science; Business; Environmental economics; Industrial organization; Operations management; Electricity; Engineering; International economics","score_opus":0.00912219710981073,"score_gpt":0.22584398677751238,"score_spread":0.21672178966770164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992856267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008444725,0.00042868633,0.96460843,0.0010231691,0.000067761306,0.00015206085,0.0003274408,0.00020042922,0.024747308],"genre_scores_gemma":[0.65217555,0.00155269,0.32083353,0.0005377903,0.00013413995,0.0009104087,0.0004293809,0.00026754214,0.023159057],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992107,0.00035533737,0.000021884278,0.0001275431,0.0001649885,0.00011951026],"domain_scores_gemma":[0.9991019,0.00060654606,0.00008677722,0.00003306195,0.0001136036,0.000058067937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018466365,0.0014960828,0.0009945129,0.0007602981,0.00055528485,0.002227956,0.0019234153,0.0019305171,0.010321322],"category_scores_gemma":[0.0027127683,0.000848683,0.001255509,0.0011465559,0.0010254116,0.0015171466,0.0014639226,0.0018434331,0.0008454899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028036557,0.000045762077,0.00018111874,0.00007321432,0.000016148942,0.000077586585,0.00005351088,0.92538625,0.00040573507,0.06528752,0.0017924139,0.0066526243],"study_design_scores_gemma":[0.000020116126,0.000027135919,0.00006740582,0.000015591544,0.000007611737,0.000020654887,0.000028145536,0.98244905,0.00011420084,0.015320885,0.0019213305,0.000007847954],"about_ca_topic_score_codex":0.011324603,"about_ca_topic_score_gemma":0.01134402,"teacher_disagreement_score":0.011324603,"about_ca_system_score_codex":0.0024709583,"about_ca_system_score_gemma":0.0030575127,"threshold_uncertainty_score":0.034528255},"labels":[],"label_agreement":null},{"id":"W2993737652","doi":"10.48550/arxiv.1809.00512","title":"A Bilevel Approach to Optimal Price-Setting of Time-and-Level-of-Use Tariffs","year":2018,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Limit (mathematics); Computer science; Frame (networking); Mathematical optimization; Consumption (sociology); Time limit; Scheme (mathematics); Energy consumption; Resolution (logic); Energy (signal processing); Operations research; Optimization problem; Economics; Mathematics; Artificial intelligence; Statistics; Engineering","score_opus":0.09785578034691972,"score_gpt":0.1720687210870152,"score_spread":0.07421294074009549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2993737652","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075371806,0.00023554331,0.9880171,0.0002980882,0.00005021209,0.000045920024,0.000087387314,0.000088184985,0.0036403814],"genre_scores_gemma":[0.68628466,0.00057537877,0.30696642,0.00020506851,0.000097783886,0.00028459664,0.0002929978,0.0001955753,0.005097481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981863,0.00087504805,0.00008008429,0.00032453908,0.00027639105,0.0002575941],"domain_scores_gemma":[0.99675804,0.0023361025,0.00026736892,0.00015828505,0.0003092381,0.00017091566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002946014,0.0013026213,0.0022242249,0.0010279719,0.00069294806,0.0036570237,0.0022561196,0.0023007505,0.005735014],"category_scores_gemma":[0.011100966,0.0014263762,0.0015204072,0.001820041,0.0015527783,0.002951371,0.0026577471,0.00437655,0.0005467505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024245734,0.000038149934,0.00023409238,0.000060695,0.000028807024,0.00003561446,0.00005300904,0.95712125,0.00022005377,0.035254527,0.00055116846,0.006378325],"study_design_scores_gemma":[0.000005406835,0.000013050737,0.000035562025,0.000007826168,0.000004823715,0.000007642674,0.000014700932,0.9819311,0.000087988665,0.017475164,0.00041103465,0.000005604622],"about_ca_topic_score_codex":0.0077092187,"about_ca_topic_score_gemma":0.0060757627,"teacher_disagreement_score":0.0077092187,"about_ca_system_score_codex":0.0018359455,"about_ca_system_score_gemma":0.0026077442,"threshold_uncertainty_score":0.019185543},"labels":[],"label_agreement":null},{"id":"W2994112501","doi":"10.1109/tia.2019.2957432","title":"Developing and Testing a Unit-Commitment-Based Controller of Bus-Split Aggregated Residential Electric Water Heaters","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Controller (irrigation); Automotive engineering; Peak demand; Engineering; Computer science; Simulation; Control theory (sociology); Electricity; Control (management); Electrical engineering","score_opus":0.019735941043393927,"score_gpt":0.22440663841691472,"score_spread":0.20467069737352078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994112501","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50237,0.00031420882,0.4760297,0.00028378583,0.00021110843,0.0008636283,0.00018238038,0.005135261,0.014609917],"genre_scores_gemma":[0.96851426,0.00003729506,0.02950401,0.000033122356,0.0000077707455,0.00015120467,0.000057967565,0.000036883695,0.0016575092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994116,0.00013829875,0.00003062017,0.00011803996,0.00023586041,0.000065563],"domain_scores_gemma":[0.99905425,0.0003765112,0.0000901512,0.000110221015,0.00030700158,0.00006187286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009145784,0.00062358147,0.00054223405,0.00023776175,0.00038509906,0.0008518837,0.0014999248,0.00058739405,0.0025401348],"category_scores_gemma":[0.0019122006,0.0003038971,0.00022922459,0.00015863546,0.00042004432,0.00048822694,0.0004253083,0.0009677191,0.00040713197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059157773,0.0005311883,0.0027652818,0.00041453185,0.00012968856,0.00027069813,0.00017417652,0.8602701,0.042943757,0.0025733518,0.0016800626,0.0876556],"study_design_scores_gemma":[0.00004563503,0.00019265762,0.0002887011,0.000004694848,0.000009845672,0.0000147564015,0.000014104781,0.9866904,0.012096505,0.00010543607,0.00052989996,0.000007333112],"about_ca_topic_score_codex":0.0074405577,"about_ca_topic_score_gemma":0.0033724238,"teacher_disagreement_score":0.0074405577,"about_ca_system_score_codex":0.00061805063,"about_ca_system_score_gemma":0.00094992464,"threshold_uncertainty_score":0.0147945285},"labels":[],"label_agreement":null},{"id":"W2994462904","doi":"10.1109/allerton.2019.8919681","title":"Optimal Operation of Sanitary Pump Stations with Energy Storage During Power Outages","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Richmond Hospital; Alberta Energy; University of British Columbia","funders":"","keywords":"Energy storage; Energy consumption; Energy (signal processing); Power (physics); Control (management); Computer science; Automotive engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.0026480455869319665,"score_gpt":0.1617506074099682,"score_spread":0.15910256182303623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994462904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37659734,0.00044765708,0.6111001,0.00064201077,0.00006541456,0.00017192727,0.00019709473,0.00032967393,0.0104487715],"genre_scores_gemma":[0.99478674,0.00005745053,0.004512215,0.000013706109,0.0000050634803,0.000023383058,0.00001551924,0.000005663408,0.0005802699],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997067,0.00008044259,0.000015983653,0.000067889036,0.000043422016,0.00008566255],"domain_scores_gemma":[0.9994997,0.00023526675,0.00014705371,0.000017463868,0.000060871702,0.00003964618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006433076,0.0007198941,0.0008420131,0.00029821566,0.00038991633,0.001088303,0.0006016011,0.0007955047,0.0016541871],"category_scores_gemma":[0.0014675929,0.00042587504,0.00032052005,0.00030251045,0.0007219356,0.00075520657,0.00070494827,0.0004954566,0.0001365713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016962388,0.000037944083,0.00063794246,0.00004572253,0.00002036091,0.00007995954,0.00003508909,0.9857438,0.0037304908,0.002936894,0.0002529595,0.006309153],"study_design_scores_gemma":[0.000022543521,0.00006871456,0.00024708678,0.0000043125383,0.000009122941,0.0000072343296,0.000022458158,0.9978879,0.0007082581,0.0008940381,0.00012356971,0.0000047762674],"about_ca_topic_score_codex":0.00594636,"about_ca_topic_score_gemma":0.004216497,"teacher_disagreement_score":0.00594636,"about_ca_system_score_codex":0.00065609015,"about_ca_system_score_gemma":0.00087478105,"threshold_uncertainty_score":0.011823535},"labels":[],"label_agreement":null},{"id":"W2994956262","doi":"10.22215/etd/2013-06215","title":"Flexible residential smart grid simulation framework","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Library and Archives Canada","funders":"","keywords":"Grid; Computer science; Smart grid; Architectural engineering; Humanities; Engineering; Geography; Art; Electrical engineering","score_opus":0.009716316484631103,"score_gpt":0.2463406863999401,"score_spread":0.236624369915309,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994956262","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027438285,0.00024756158,0.90379614,0.00051317696,0.00012780254,0.0002641343,0.0028793553,0.018905947,0.045827616],"genre_scores_gemma":[0.64324236,0.0006630201,0.31639725,0.0002320196,0.00005570005,0.0005964945,0.0067388066,0.0018797433,0.030194605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996563,0.00011432959,0.000021434029,0.000058860645,0.00010328286,0.000045727105],"domain_scores_gemma":[0.99968946,0.00007760347,0.00001507389,0.00008130796,0.00009615467,0.0000404146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007142465,0.0006163762,0.00064279366,0.00043133824,0.000585874,0.0013410648,0.0019458446,0.0006669053,0.012054518],"category_scores_gemma":[0.0010650535,0.00039198142,0.00081410905,0.00055693625,0.00034744813,0.0013205017,0.001200894,0.00080850837,0.0024129406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012935554,0.00007045647,0.00091921573,0.00008458566,0.000047690508,0.0001276912,0.00012944143,0.919557,0.0017286383,0.03946201,0.010860839,0.026883123],"study_design_scores_gemma":[0.000021481354,0.000008937142,0.000084705796,0.000009009686,0.0000059332197,0.000017093416,0.000017528975,0.97989833,0.00067086006,0.005856152,0.013403114,0.0000067035635],"about_ca_topic_score_codex":0.013605788,"about_ca_topic_score_gemma":0.01779032,"teacher_disagreement_score":0.013605788,"about_ca_system_score_codex":0.0009764503,"about_ca_system_score_gemma":0.001660506,"threshold_uncertainty_score":0.040326416},"labels":[],"label_agreement":null},{"id":"W2995156716","doi":"10.1109/tii.2019.2960802","title":"An Efficient Peer-to-Peer Energy-Sharing Framework for Numerous Community Prosumers","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Fundamental Research Funds for the Central Universities; Natural Science Foundation of Hubei Province; China Postdoctoral Science Foundation; National Natural Science Foundation of China","keywords":"Renewable energy; Computer science; Peer-to-peer; Environmental economics; Energy management; Energy (signal processing); Efficient energy use; Distributed generation; Distributed computing; Engineering; Economics","score_opus":0.038397197624751175,"score_gpt":0.26295790518108386,"score_spread":0.22456070755633267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995156716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016145442,0.00021145043,0.97854346,0.00017408389,0.000042052518,0.00012239574,0.00003944776,0.00021022791,0.004511469],"genre_scores_gemma":[0.8310741,0.00029451263,0.16305844,0.00008634429,0.00006655386,0.0002867808,0.00009042635,0.00005417875,0.0049885726],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914455,0.00024775325,0.000041286658,0.00017294285,0.0002852319,0.000108151915],"domain_scores_gemma":[0.99964297,0.000108234555,0.000033771277,0.000043803382,0.000114673785,0.00005666568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013146306,0.0008358892,0.0010220128,0.00046300923,0.0013748208,0.0011428919,0.0028375646,0.0012199855,0.0033739724],"category_scores_gemma":[0.0014543191,0.0003410493,0.0007365741,0.00061496237,0.00063960766,0.0022832127,0.002212382,0.00085405546,0.0004499517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013556253,0.00014613752,0.0005134597,0.00012966208,0.000066197696,0.0005020829,0.00031316341,0.83010894,0.0064324043,0.09670543,0.0029645788,0.0619823],"study_design_scores_gemma":[0.000017007362,0.00004071847,0.000047722402,0.0000042890806,0.000012411766,0.00006294996,0.000047974834,0.98400635,0.0004853799,0.013163553,0.002098946,0.000012712962],"about_ca_topic_score_codex":0.0031699545,"about_ca_topic_score_gemma":0.0037859487,"teacher_disagreement_score":0.0033739724,"about_ca_system_score_codex":0.0006382421,"about_ca_system_score_gemma":0.0012827923,"threshold_uncertainty_score":0.011287093},"labels":[],"label_agreement":null},{"id":"W2995371371","doi":"","title":"Time of use pricing for demand response","year":2019,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; On demand; Computer science; Engineering; Electrical engineering","score_opus":0.01295226907242878,"score_gpt":0.20799361032204414,"score_spread":0.19504134124961536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995371371","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13061188,0.0029173852,0.76998603,0.006911265,0.0024709918,0.00026994516,0.00070365425,0.0019619486,0.08416694],"genre_scores_gemma":[0.96221393,0.0007115984,0.015330873,0.00022630676,0.00048979576,0.00006246858,0.000154483,0.00025310804,0.020557452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9982521,0.0006846313,0.00005703294,0.00020188332,0.00046252072,0.00034184507],"domain_scores_gemma":[0.9952807,0.002906509,0.00019763825,0.0005064318,0.0008532946,0.00025533835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002340705,0.0007861445,0.0013194185,0.0006506537,0.00080482755,0.0033809945,0.0018095444,0.0019983372,0.029385237],"category_scores_gemma":[0.013164825,0.00040264023,0.0007755525,0.0016967463,0.0007718671,0.004101452,0.0011187604,0.0020211788,0.0019953516],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008197587,0.0003088401,0.00095510355,0.00029031848,0.000067831825,0.00029838772,0.00015432025,0.47104004,0.004862726,0.3353355,0.02839352,0.15747374],"study_design_scores_gemma":[0.00002055154,0.00006800984,0.00029788964,0.000016254555,0.000018639386,0.000074672185,0.00006534394,0.9114786,0.0010045884,0.081723176,0.0052135056,0.000018694465],"about_ca_topic_score_codex":0.0041093067,"about_ca_topic_score_gemma":0.0024712074,"teacher_disagreement_score":0.029385237,"about_ca_system_score_codex":0.002167955,"about_ca_system_score_gemma":0.0012824972,"threshold_uncertainty_score":0.09830344},"labels":[],"label_agreement":null},{"id":"W3000045075","doi":"10.1007/s40095-019-00330-3","title":"Numerical simulation analysis of the impact of photovoltaic systems and energy storage technologies on centralised generation: a case study for Australia","year":2020,"lang":"en","type":"article","venue":"International journal of energy and environmental engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Photovoltaic system; Renewable energy; Software deployment; Context (archaeology); Greenhouse gas; Environmental economics; Energy storage; Distributed generation; Electricity generation; Computer science; Electric power system; Engineering; Reliability engineering; Systems engineering; Power (physics); Electrical engineering","score_opus":0.019857011535619966,"score_gpt":0.24050471635211362,"score_spread":0.22064770481649365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000045075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98166317,0.00014304392,0.0071491953,0.00022364043,0.00002773924,0.00007557174,0.00032665132,0.00008213091,0.010308984],"genre_scores_gemma":[0.9945668,0.00008903639,0.0029802434,0.000016519896,0.0000037217778,0.00003835884,0.00014513705,0.000009133618,0.0021511104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999811,0.000060447182,0.000011134368,0.000024766201,0.000043830467,0.000048878614],"domain_scores_gemma":[0.9991301,0.00048921705,0.00007480947,0.000047642163,0.00018230567,0.0000759469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046247218,0.00048714448,0.00059538917,0.00051959354,0.00065538334,0.0010322822,0.00084605603,0.001257028,0.0024659776],"category_scores_gemma":[0.0009952921,0.00030117977,0.00076593395,0.0005765362,0.000596118,0.0004951846,0.00074753875,0.0009340424,0.00016389108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006861329,0.0001348403,0.004514182,0.000056664387,0.000020015596,0.00044728647,0.00008759737,0.9904137,0.001135041,0.0008782443,0.00026497562,0.0019788125],"study_design_scores_gemma":[0.000020012543,0.00008335857,0.0018593231,0.000009019578,0.000012657722,0.000026033782,0.00012686916,0.996675,0.00054489664,0.00024831368,0.00038684308,0.0000076249653],"about_ca_topic_score_codex":0.050941247,"about_ca_topic_score_gemma":0.03237813,"teacher_disagreement_score":0.050941247,"about_ca_system_score_codex":0.0011402967,"about_ca_system_score_gemma":0.0008210803,"threshold_uncertainty_score":0.10128951},"labels":[],"label_agreement":null},{"id":"W3000723039","doi":"10.1109/tste.2020.2967428","title":"Spatio-Temporal Flexibility Management in Low-Carbon Power Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Microgrid; Renewable energy; Scheduling (production processes); Wind power; Electric power system; Flexibility (engineering); Electricity generation; Reliability engineering; Mathematical optimization; Distributed computing; Power (physics); Engineering; Electrical engineering","score_opus":0.009397364776037984,"score_gpt":0.19943015675183715,"score_spread":0.19003279197579917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000723039","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09539786,0.00031289682,0.89570665,0.00041100007,0.00002678395,0.00003740457,0.00018767017,0.00021146657,0.007708277],"genre_scores_gemma":[0.98541844,0.00014198347,0.013524102,0.000019315505,0.000009425959,0.00003047046,0.000043043907,0.000020683992,0.0007924978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959487,0.00016607207,0.000021100148,0.00006167946,0.000093817296,0.000062531624],"domain_scores_gemma":[0.9991523,0.00045888315,0.00017649686,0.000087411616,0.00007236747,0.000052414343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092158816,0.00039660695,0.0002537888,0.0003148177,0.00037659678,0.00092990795,0.00067583704,0.0004496998,0.0013094847],"category_scores_gemma":[0.002307188,0.00025858096,0.00042502338,0.00051867485,0.00069206534,0.0013383458,0.00075278373,0.000569238,0.0001336171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017876331,0.000007472844,0.00027629756,0.000009839277,0.000007409035,0.000058746027,0.000023586004,0.977833,0.0006834575,0.016914193,0.00009382934,0.0040742974],"study_design_scores_gemma":[0.0000018472608,0.000010751621,0.00020276588,0.0000024473584,0.0000021269266,0.000013743207,0.000012485462,0.98819935,0.00024038914,0.0110404035,0.00026970464,0.0000039576053],"about_ca_topic_score_codex":0.004344929,"about_ca_topic_score_gemma":0.0036626365,"teacher_disagreement_score":0.004344929,"about_ca_system_score_codex":0.0008824958,"about_ca_system_score_gemma":0.0005527918,"threshold_uncertainty_score":0.008639276},"labels":[],"label_agreement":null},{"id":"W3001725623","doi":"10.1049/iet-rpg.2019.0992","title":"Stochastic constrained linear quadratic control in a network of smart microgrids","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Quadratic equation; Mathematical optimization; Control theory (sociology); Computer science; Control (management); Mathematics; Artificial intelligence","score_opus":0.012668382767124101,"score_gpt":0.1975813522681203,"score_spread":0.1849129695009962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3001725623","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08874064,0.00048352507,0.9000123,0.00073918054,0.00010802917,0.00007642253,0.0001442838,0.00030638097,0.009389281],"genre_scores_gemma":[0.98580533,0.00016206173,0.010196129,0.000078180485,0.000029360046,0.000087706336,0.000066614935,0.000020806963,0.0035536806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907684,0.00033914467,0.000032054086,0.0002361606,0.00017093286,0.00014492434],"domain_scores_gemma":[0.99878174,0.0006793913,0.00020854306,0.00004115199,0.0002261504,0.00006306172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013472185,0.00094713434,0.0010512794,0.0003071984,0.00038571906,0.0012830384,0.00085690117,0.0009732145,0.0015111918],"category_scores_gemma":[0.0021407625,0.00046670123,0.0005477241,0.0005189929,0.0012419885,0.0006260172,0.001233775,0.00094844104,0.00014335402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030996176,0.000010807091,0.00011752055,0.000023614448,0.000014244995,0.00003576021,0.000020592253,0.9930306,0.00034588858,0.004281176,0.00017192097,0.0019168645],"study_design_scores_gemma":[0.000006876318,0.000015502274,0.000051942734,0.0000013612884,0.000002504736,0.0000021949504,0.000004707352,0.9987564,0.000041214258,0.0010261653,0.00008948661,0.0000017777369],"about_ca_topic_score_codex":0.02243654,"about_ca_topic_score_gemma":0.012821154,"teacher_disagreement_score":0.02243654,"about_ca_system_score_codex":0.0012633831,"about_ca_system_score_gemma":0.0014273055,"threshold_uncertainty_score":0.04461187},"labels":[],"label_agreement":null},{"id":"W3001888582","doi":"10.30634/2414-2077.2019.05.06","title":"Comparison of Several Simplistic High-Level Approaches for Estimating the Global Energy and Electricity Use of ICT Networks and Data Centers","year":2019,"lang":"en","type":"article","venue":"International Journal of Green Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Electricity; Computer science; Environmental economics; Energy (signal processing); Data science; Environmental science; Engineering; Statistics; Economics; Mathematics; Electrical engineering; World Wide Web","score_opus":0.06237011192710931,"score_gpt":0.28526456128278493,"score_spread":0.22289444935567562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3001888582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17949893,0.0014130612,0.8098915,0.00033107377,0.00008549884,0.00017171598,0.0014257936,0.0012608663,0.0059215296],"genre_scores_gemma":[0.70977265,0.00058663555,0.28600642,0.0001248251,0.00005376808,0.00017609778,0.0015058353,0.00016995928,0.0016037639],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844545,0.00074749475,0.00012432014,0.00017382498,0.00040583804,0.00010309413],"domain_scores_gemma":[0.9928865,0.005124155,0.00023192276,0.00063642545,0.0010195936,0.00010147602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032773037,0.00097306573,0.0012662949,0.0018607369,0.0008384295,0.0022753854,0.0023397508,0.0015405503,0.0020483912],"category_scores_gemma":[0.010488612,0.0006504014,0.0014479327,0.0021005054,0.0006573469,0.001707669,0.0014026907,0.00093999034,0.00055487984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044749322,0.00015033211,0.00959185,0.00033133567,0.0004424802,0.00009209322,0.0001761875,0.8935198,0.0014209546,0.0052022724,0.0007462322,0.08787908],"study_design_scores_gemma":[0.000026633303,0.00005036666,0.0028189954,0.000016571568,0.00007535973,0.000024442865,0.000053267442,0.99364024,0.00057643594,0.0023194428,0.00038092295,0.000017303502],"about_ca_topic_score_codex":0.040041924,"about_ca_topic_score_gemma":0.034417953,"teacher_disagreement_score":0.040041924,"about_ca_system_score_codex":0.0015933266,"about_ca_system_score_gemma":0.0018919134,"threshold_uncertainty_score":0.07961768},"labels":[],"label_agreement":null},{"id":"W3003691962","doi":"10.1109/pesgm40551.2019.8973951","title":"Multi-Objective Energy Management in a Residential Area with a P2G-Based Storage System","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Mathematical optimization; Energy consumption; Computer science; Integer programming; Power system simulation; Energy management; Electric power system; Linear programming; Scheduling (production processes); Energy storage; Iterative method; Range (aeronautics); Energy management system; Reliability engineering; Energy (signal processing); Power (physics); Engineering; Mathematics","score_opus":0.0053326676530940035,"score_gpt":0.1727891310940889,"score_spread":0.16745646344099488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003691962","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7631731,0.0006585104,0.2239158,0.00051683356,0.00004462957,0.0001991468,0.00022369463,0.00039878106,0.010869481],"genre_scores_gemma":[0.99250984,0.00007099121,0.006230975,0.000014492576,0.000005967388,0.00002785826,0.00002488884,0.0000065171707,0.0011084897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999796,0.00009041003,0.000009277828,0.000032894517,0.000032292228,0.000039128376],"domain_scores_gemma":[0.99983954,0.00007496468,0.00002445594,0.000007305942,0.000032133365,0.000021600328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047307197,0.0006044737,0.0008157293,0.00029769295,0.00063947507,0.0007596069,0.00043377889,0.0006324551,0.0014915215],"category_scores_gemma":[0.00030484717,0.00024445297,0.00038459004,0.0004412647,0.000362532,0.0005081301,0.00062877085,0.00035578985,0.00012554828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001259964,0.00007096341,0.000737863,0.00005176483,0.000025880896,0.00027678598,0.000026610722,0.9872349,0.0024720572,0.00071021536,0.00030246653,0.007964386],"study_design_scores_gemma":[0.000012279816,0.000065513246,0.00028054294,0.0000017814273,0.000008639691,0.00001571853,0.00002436013,0.99875975,0.00046718644,0.00025447755,0.00010600204,0.0000037002471],"about_ca_topic_score_codex":0.008305773,"about_ca_topic_score_gemma":0.008303008,"teacher_disagreement_score":0.008305773,"about_ca_system_score_codex":0.0006073655,"about_ca_system_score_gemma":0.0006575368,"threshold_uncertainty_score":0.016514897},"labels":[],"label_agreement":null},{"id":"W3003808304","doi":"10.1109/pesgm40551.2019.8973436","title":"Service Restoration with Active Cold Load Pick-Up Management","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Integer programming; Service (business); Linear programming; Metering mode; Computer science; Load management; Control (management); Operations research; Computer network; Engineering; Business; Electrical engineering; Algorithm","score_opus":0.004816005035099966,"score_gpt":0.16878133128140632,"score_spread":0.16396532624630636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003808304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068873866,0.000054795604,0.9895537,0.000061171195,0.000037563153,0.000109207955,0.000016460093,0.0009375908,0.0023421235],"genre_scores_gemma":[0.60892373,0.00011574729,0.3831629,0.00012825822,0.00007898174,0.00015899916,0.00012251716,0.00020429451,0.007104575],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924856,0.00014248662,0.000029300763,0.00014348066,0.00030205664,0.00013403033],"domain_scores_gemma":[0.9995023,0.000096023134,0.00010621193,0.00010215179,0.0001364526,0.000056932535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065061904,0.0009173838,0.00080815906,0.0008844066,0.0008308154,0.0012804442,0.0019686017,0.00055891875,0.0035107858],"category_scores_gemma":[0.0009279811,0.00027736748,0.0006208743,0.00054005586,0.0008069486,0.0010628697,0.0012616544,0.0010825482,0.00081493566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032207576,0.00034998052,0.0012776894,0.00025897758,0.0000466356,0.0003190483,0.00034359447,0.45293596,0.041837137,0.041669905,0.0060685896,0.4545704],"study_design_scores_gemma":[0.000020060423,0.00018809839,0.00027381655,0.000016432376,0.000017914248,0.00016695821,0.000055459164,0.9708877,0.012915296,0.008293092,0.007141821,0.00002337361],"about_ca_topic_score_codex":0.0025061832,"about_ca_topic_score_gemma":0.0030629057,"teacher_disagreement_score":0.0035107858,"about_ca_system_score_codex":0.00068388676,"about_ca_system_score_gemma":0.0014546383,"threshold_uncertainty_score":0.011744678},"labels":[],"label_agreement":null},{"id":"W3004224327","doi":"10.1109/pesgm40551.2019.8973824","title":"Stochastic Demand Response under Random Renewable Power Generation in Smart Grid","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Demand response; Computer science; Smart grid; Renewable energy; Photovoltaic system; Mathematical optimization; Energy storage; Load profile; Peak demand; Electric power system; Schedule; Grid; Reliability engineering; Automotive engineering; Power (physics); Electricity; Engineering; Electrical engineering; Mathematics","score_opus":0.008359891604479789,"score_gpt":0.19428273185541087,"score_spread":0.1859228402509311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004224327","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35099265,0.00015462853,0.64342946,0.00059519947,0.00006002502,0.0000741186,0.00019222627,0.0003981783,0.004103486],"genre_scores_gemma":[0.9959853,0.000032354736,0.003386359,0.000030431616,0.0000074361687,0.00001854717,0.00003136135,0.000014136557,0.00049400976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833965,0.0007737311,0.00006291538,0.00026964908,0.0002751941,0.0002788624],"domain_scores_gemma":[0.9960181,0.0025799691,0.0006867394,0.0002050666,0.00032514377,0.00018502139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020375,0.00059516844,0.00095978024,0.00026084765,0.00038392917,0.0008698447,0.00090157986,0.00088473834,0.0012096404],"category_scores_gemma":[0.00577975,0.0005288747,0.00053574634,0.00045515102,0.00076268194,0.0011009544,0.0007957694,0.00091122044,0.00016219143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008742492,0.000024095198,0.0005287135,0.000013804021,0.000014285902,0.0001041632,0.000024182906,0.9897317,0.0007120181,0.0066679996,0.00019858738,0.0018929924],"study_design_scores_gemma":[0.0000050906497,0.000010627294,0.00009937951,7.3039934e-7,0.0000019854429,0.000008627413,0.0000082264805,0.9981179,0.00010458109,0.001608231,0.000031269985,0.0000032865387],"about_ca_topic_score_codex":0.0037538619,"about_ca_topic_score_gemma":0.002983758,"teacher_disagreement_score":0.0037538619,"about_ca_system_score_codex":0.0013071807,"about_ca_system_score_gemma":0.0005622212,"threshold_uncertainty_score":0.010775447},"labels":[],"label_agreement":null},{"id":"W3004313315","doi":"10.1109/pesgm40551.2019.8973753","title":"Distributionally Robust Chance-Constrained Energy Management for Islanded Microgrids","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Microgrid; Mathematical optimization; Computer science; Robust optimization; Wind power; Smart grid; Energy management; Moment (physics); Renewable energy; Ambiguity; Distributed generation; Grid; Energy storage; Power (physics); Energy (signal processing); Engineering; Mathematics; Control (management)","score_opus":0.005268863499333601,"score_gpt":0.16854617849841738,"score_spread":0.16327731499908377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004313315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014913674,0.00023829346,0.98239756,0.00016375123,0.000025065672,0.000026253847,0.00004566111,0.000098311895,0.0020914152],"genre_scores_gemma":[0.96261936,0.00026545886,0.035085823,0.00007384973,0.00003932197,0.00007873395,0.000083082574,0.000040137274,0.0017141348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946743,0.00019268817,0.000025837708,0.000108003675,0.00013858902,0.00006750336],"domain_scores_gemma":[0.9993461,0.00033658935,0.0001415775,0.000037257207,0.00010095187,0.000037595604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009478131,0.0009452772,0.00093049736,0.00042349784,0.00035656488,0.0010022608,0.00093347963,0.00070737366,0.0012454629],"category_scores_gemma":[0.0020592853,0.0005012923,0.0008230111,0.0005749352,0.00065959635,0.0012261607,0.0011075552,0.00092930964,0.00011722299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014552265,0.0000068479353,0.00014153514,0.000017981787,0.00001520075,0.000035975187,0.000012879074,0.9887024,0.00032564055,0.00638118,0.00017145197,0.0041743866],"study_design_scores_gemma":[0.000001570839,0.000007249652,0.000034546432,0.0000014551181,0.000002170391,0.000004623191,0.0000027118429,0.9976534,0.000075318094,0.0021283238,0.00008596167,0.0000025492957],"about_ca_topic_score_codex":0.0049054846,"about_ca_topic_score_gemma":0.003409007,"teacher_disagreement_score":0.0049054846,"about_ca_system_score_codex":0.0007611002,"about_ca_system_score_gemma":0.00086870376,"threshold_uncertainty_score":0.009753883},"labels":[],"label_agreement":null},{"id":"W3004818988","doi":"10.1109/tia.2020.2972203","title":"A New Approach for Estimating Frequency Variations Due to Smart Grid Functions","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Electric power system; Nonlinear system; Power (physics); AC power; Computer science; Grid; Control theory (sociology); Set (abstract data type); Load management; Dynamic demand; Load balancing (electrical power); Engineering; Electrical engineering; Voltage; Mathematics; Control (management)","score_opus":0.028962386665438097,"score_gpt":0.23513991245738988,"score_spread":0.20617752579195178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004818988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010538779,0.00004998604,0.9882704,0.00001990117,0.000013408934,0.000016595335,0.00008692789,0.00028462464,0.00071939745],"genre_scores_gemma":[0.5316538,0.0003154918,0.4638874,0.000060645987,0.00009015454,0.00009858076,0.00052599196,0.00014648733,0.0032214522],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995732,0.000074954136,0.00001647259,0.000113569746,0.00019438974,0.000027481208],"domain_scores_gemma":[0.99956113,0.00017895276,0.0000739337,0.000070824615,0.00010159991,0.0000135161345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031345114,0.0007033699,0.00051673286,0.0010583405,0.00022514998,0.00057106256,0.0004964562,0.00045113472,0.0011397288],"category_scores_gemma":[0.0017936067,0.00028516236,0.00040670257,0.0006296884,0.0002514717,0.0011036405,0.00043703747,0.0007499265,0.00046715813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021293871,0.0000813089,0.007840873,0.00012750931,0.00011763614,0.00017264402,0.00015921998,0.5807739,0.0445871,0.012624633,0.0016299818,0.3516723],"study_design_scores_gemma":[0.0000056172985,0.000025793977,0.001534584,0.000005121608,0.000011898038,0.00006454656,0.000015983465,0.9895315,0.0048517594,0.0020244874,0.0019103098,0.000018297298],"about_ca_topic_score_codex":0.0037771913,"about_ca_topic_score_gemma":0.0038902615,"teacher_disagreement_score":0.0037771913,"about_ca_system_score_codex":0.0004160187,"about_ca_system_score_gemma":0.00036207953,"threshold_uncertainty_score":0.0075104237},"labels":[],"label_agreement":null},{"id":"W3005567020","doi":"10.1016/j.epsr.2020.106257","title":"A new measure to evaluate demand response effectiveness and its optimization","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Measure (data warehouse); Demand response; Computer science; Operations research; Mathematical optimization; Engineering; Mathematics; Data mining; Electrical engineering","score_opus":0.0387850419486252,"score_gpt":0.3024262366947531,"score_spread":0.2636411947461279,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005567020","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2237521,0.0014405556,0.7457575,0.0005131159,0.00024824584,0.00034131948,0.0015272798,0.0024047724,0.02401507],"genre_scores_gemma":[0.8881595,0.0002381019,0.10653742,0.00015860234,0.0001357716,0.00026147586,0.0010544091,0.00025071893,0.0032040419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99526274,0.001361212,0.00035172707,0.00056049146,0.0021539463,0.00030977672],"domain_scores_gemma":[0.9857056,0.009650877,0.0011820887,0.0011686179,0.0019775438,0.00031528287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035338185,0.0011916618,0.0014187328,0.0036054405,0.00033932168,0.0018461302,0.00073703687,0.0012248422,0.0032433695],"category_scores_gemma":[0.012544082,0.00022780229,0.0007885483,0.0024021994,0.00085392076,0.002411365,0.0007385517,0.0009005891,0.0006629226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013524779,0.0012644121,0.03120258,0.0004573431,0.00075204775,0.00012527508,0.00015964813,0.64712626,0.03194348,0.0139576355,0.005172686,0.2664862],"study_design_scores_gemma":[0.000049852853,0.0011187161,0.016441928,0.00002834763,0.00015737761,0.00020264056,0.0001357644,0.9547166,0.020393495,0.003311081,0.0033778227,0.000066388835],"about_ca_topic_score_codex":0.001630091,"about_ca_topic_score_gemma":0.0011924034,"teacher_disagreement_score":0.0036054405,"about_ca_system_score_codex":0.0013391299,"about_ca_system_score_gemma":0.0007369874,"threshold_uncertainty_score":0.018688858},"labels":[],"label_agreement":null},{"id":"W3005983588","doi":"10.1109/jsyst.2020.2970001","title":"Local Estimation of Critical and Off-Peak Periods for Grid-Friendly Flexible Load Management","year":2020,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Computer science; Identification (biology); Context (archaeology); Load profile; Demand response; Grid; Load management; Load shifting; Real-time computing; Reliability engineering; Electricity; Energy management system; Energy management; Engineering; Energy (signal processing); Electrical engineering","score_opus":0.014854789686782076,"score_gpt":0.24446559555054967,"score_spread":0.2296108058637676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005983588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2277554,0.0001880484,0.7656464,0.00006122273,0.000040178697,0.000052635343,0.00023198592,0.0016979494,0.004326102],"genre_scores_gemma":[0.9771887,0.00004572667,0.022086274,0.000011451188,0.000012962316,0.000016823009,0.00009846151,0.00004815708,0.0004914355],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999107,0.000021132211,0.0000043009773,0.000026499589,0.000025514948,0.000011870331],"domain_scores_gemma":[0.9998313,0.00006518521,0.000035896188,0.000023646644,0.00003072783,0.000013225004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013505972,0.0005339363,0.00036640998,0.00060215837,0.00018459598,0.00036389852,0.00023511722,0.0002243248,0.0012259948],"category_scores_gemma":[0.00038574613,0.00012030338,0.000117321164,0.0004427761,0.00012921174,0.00038229517,0.0002511219,0.00028781124,0.00039275663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010427169,0.00040542323,0.021179294,0.00038952194,0.000057205394,0.00025579796,0.00037825693,0.14354962,0.3273052,0.0028768752,0.0032153586,0.49934474],"study_design_scores_gemma":[0.000030184601,0.0001843766,0.027598869,0.00002417413,0.000037281217,0.000120214245,0.00017844728,0.8876514,0.07954341,0.001856452,0.0027349538,0.000040246192],"about_ca_topic_score_codex":0.0008697771,"about_ca_topic_score_gemma":0.00232384,"teacher_disagreement_score":0.0012259948,"about_ca_system_score_codex":0.00015073735,"about_ca_system_score_gemma":0.00019191652,"threshold_uncertainty_score":0.0041013956},"labels":[],"label_agreement":null},{"id":"W3006093126","doi":"10.1109/appeec45492.2019.8994380","title":"Proof of Concept of a Cloud-Based Smart Dual-Fuel Switching System to Control the Operation of a Hybrid Residential HVAC System","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"","keywords":"HVAC; Thermostat; Automotive engineering; Computer science; Cloud computing; Smart grid; Dual (grammatical number); Demand response; Control system; Embedded system; Air conditioning; Real-time computing; Engineering; Electrical engineering; Operating system; Electricity","score_opus":0.004614422300272855,"score_gpt":0.18328783079150598,"score_spread":0.17867340849123314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006093126","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21330398,0.0008063462,0.7283145,0.0020702612,0.001272282,0.0013510173,0.0006225478,0.0062392834,0.046019785],"genre_scores_gemma":[0.91518414,0.00019896434,0.0729469,0.00023256717,0.00005166619,0.00026742928,0.00014306435,0.000065313,0.010910001],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996106,0.000044346023,0.000015679349,0.00006845154,0.00020918921,0.00005182064],"domain_scores_gemma":[0.99970263,0.000033950422,0.000030716084,0.000039402785,0.00014638754,0.00004686181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037689827,0.00035913903,0.00031354828,0.00022517037,0.00032553112,0.0006727884,0.0011631686,0.00055455044,0.004727961],"category_scores_gemma":[0.00035708363,0.00017131881,0.00027606552,0.00010903948,0.00032826178,0.00050798967,0.0005090318,0.00057524216,0.0009892352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009823435,0.0011442535,0.0033645118,0.0008104604,0.00011405467,0.001980925,0.00041145584,0.03414206,0.72045296,0.036363073,0.020767586,0.17946632],"study_design_scores_gemma":[0.00044937583,0.0029620605,0.0054299785,0.000107085274,0.00008017602,0.0013917867,0.00018538654,0.4118804,0.49586314,0.0037446364,0.07780248,0.00010351067],"about_ca_topic_score_codex":0.0016481417,"about_ca_topic_score_gemma":0.0009784955,"teacher_disagreement_score":0.004727961,"about_ca_system_score_codex":0.00037576928,"about_ca_system_score_gemma":0.0006327659,"threshold_uncertainty_score":0.015816629},"labels":[],"label_agreement":null},{"id":"W3006327149","doi":"10.3390/fi12020037","title":"Global Trends and Advances Towards a Smarter Grid and Smart Cities","year":2020,"lang":"en","type":"article","venue":"Future Internet","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Smart grid; Grid; The Internet; Emerging technologies; Internet of Things; Telecommunications; Power grid; Smart city; Data science; Computer security; Power (physics); World Wide Web; Artificial intelligence; Electrical engineering","score_opus":0.006046753242319043,"score_gpt":0.19420738600201579,"score_spread":0.18816063275969674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006327149","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022431938,0.3833818,0.010808753,0.27484083,0.01696447,0.000037804024,0.0013470119,0.0007871781,0.28940022],"genre_scores_gemma":[0.15177374,0.7317188,0.014251707,0.033154506,0.014723739,0.0000453627,0.0016642084,0.0002765027,0.052391488],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996166,0.000053490512,0.000029752027,0.00004606915,0.00018006038,0.000073945346],"domain_scores_gemma":[0.99883085,0.00027069927,0.00019354954,0.0000523733,0.0004494063,0.00020305088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094857655,0.00038591458,0.0002547651,0.0013744235,0.0005234164,0.0032901855,0.0003566281,0.0013033045,0.016587017],"category_scores_gemma":[0.0015090507,0.00011652712,0.0002819959,0.0052337945,0.0010446451,0.0047579673,0.0011528812,0.0019016875,0.0037088683],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057251546,0.00006127906,0.006125453,0.0017883689,0.00002511197,0.00036761074,0.0011395493,0.0011577844,0.0020990924,0.18375506,0.3251262,0.4782972],"study_design_scores_gemma":[0.000002608306,0.000020505604,0.0038696462,0.00031004808,0.000011377845,0.0003758888,0.0009056744,0.0002478635,0.00025712594,0.01938158,0.9746074,0.000010223126],"about_ca_topic_score_codex":0.0014107052,"about_ca_topic_score_gemma":0.003439287,"teacher_disagreement_score":0.016587017,"about_ca_system_score_codex":0.00086496916,"about_ca_system_score_gemma":0.0017002255,"threshold_uncertainty_score":0.055489123},"labels":[],"label_agreement":null},{"id":"W3006459398","doi":"10.1109/tii.2020.2972803","title":"Optimal Real-Time Energy Management in Apartment Building Integrating Microgrid With Multizone HVAC Control","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; HVAC; Microgrid; Building automation; Building management system; Computer science; Context (archaeology); Distributed generation; Renewable energy; Apartment; Automotive engineering; Air conditioning; Control (management); Engineering; Electricity; Civil engineering","score_opus":0.015379288569467612,"score_gpt":0.20153984219297225,"score_spread":0.18616055362350464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006459398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36717454,0.0005317623,0.6214452,0.0002920118,0.000056122055,0.000092820854,0.00009736451,0.00060444104,0.00970577],"genre_scores_gemma":[0.9949486,0.000043154563,0.004272858,0.0000073777937,0.0000040776545,0.000014734347,0.000012630425,0.0000059742806,0.0006905495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998673,0.000038866805,0.0000047599196,0.00003293249,0.000025438865,0.00003074292],"domain_scores_gemma":[0.99989235,0.000039706334,0.000025699934,0.000007953394,0.00002099781,0.000013254828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034084648,0.0005985561,0.0005591665,0.00020568729,0.000357148,0.00077182555,0.0005240491,0.00039494684,0.0013179352],"category_scores_gemma":[0.0003705123,0.00026860856,0.00030563408,0.00024609343,0.00034614204,0.000384106,0.00048811064,0.00038490878,0.000096188414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058384398,0.000021838448,0.00032439627,0.000018959918,0.000013704471,0.000034080495,0.000017894397,0.9917108,0.0012657347,0.00051709265,0.00013880708,0.00587832],"study_design_scores_gemma":[0.000004868708,0.000020809173,0.00015098054,0.0000011273636,0.0000045453644,0.0000028452382,0.000008494005,0.9993026,0.0002368928,0.00019185279,0.00007296112,0.0000019720478],"about_ca_topic_score_codex":0.02126018,"about_ca_topic_score_gemma":0.020471849,"teacher_disagreement_score":0.02126018,"about_ca_system_score_codex":0.00070501846,"about_ca_system_score_gemma":0.0007271179,"threshold_uncertainty_score":0.042272866},"labels":[],"label_agreement":null},{"id":"W3007144108","doi":"10.1016/j.esd.2020.01.009","title":"Stand-alone renewable energy auctions: The case of Peru","year":2020,"lang":"en","type":"article","venue":"Energy Sustainable Development/Energy for sustainable development","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Institució Catalana de Recerca i Estudis Avançats","keywords":"Common value auction; Environmental economics; Business; Renewable energy; Electricity; Service (business); Industrial organization; Economics; Marketing; Microeconomics; Engineering","score_opus":0.008700813181302058,"score_gpt":0.1918094353165691,"score_spread":0.18310862213526705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007144108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91782624,0.0003970168,0.0019543266,0.0030630566,0.00001485111,0.00006952989,0.0004010452,0.00009259629,0.07618129],"genre_scores_gemma":[0.9905557,0.00019728765,0.0004908043,0.00008272353,0.00001121639,0.000016941833,0.00011213327,0.00001564027,0.008517622],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99955136,0.0001951716,0.00001425183,0.00004595504,0.000044805252,0.00014837229],"domain_scores_gemma":[0.99657506,0.0022725742,0.00033713065,0.00018723453,0.00033510098,0.00029280855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012511786,0.00022796265,0.0005737662,0.0006083362,0.0018471016,0.0037785424,0.0014360107,0.0027747906,0.016527852],"category_scores_gemma":[0.0066010817,0.00037324318,0.000537647,0.0012122351,0.0012213815,0.0034066688,0.0015892067,0.0022411805,0.00094479555],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022853753,0.0025161372,0.11280755,0.0007619777,0.0004846925,0.03471533,0.0059463754,0.2324978,0.002894753,0.51112664,0.038586456,0.0553769],"study_design_scores_gemma":[0.0015113218,0.0011135242,0.06297773,0.00023373892,0.0005490008,0.0053742933,0.044181477,0.59696645,0.0026626624,0.21483809,0.069224484,0.00036728955],"about_ca_topic_score_codex":0.0539455,"about_ca_topic_score_gemma":0.072874464,"teacher_disagreement_score":0.0539455,"about_ca_system_score_codex":0.0017929085,"about_ca_system_score_gemma":0.001596996,"threshold_uncertainty_score":0.10726303},"labels":[],"label_agreement":null},{"id":"W3007849172","doi":"10.1287/ijoc.2019.0904","title":"Transient-State Natural Gas Transmission in Gunbarrel Pipeline Networks","year":2020,"lang":"en","type":"article","venue":"INFORMS journal on computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Compressor station; Mathematical optimization; Computer science; Natural gas; Benchmark (surveying); Gas compressor; Energy consumption; Pipeline (software); Heuristic; Dynamic programming; Markov decision process; Curse of dimensionality; Upper and lower bounds; Mathematics; Engineering; Markov process; Artificial intelligence","score_opus":0.008294573894365017,"score_gpt":0.2002901184201685,"score_spread":0.19199554452580347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007849172","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5972387,0.00086562557,0.3910414,0.0009782609,0.00005686816,0.000089335816,0.0005455489,0.0002573356,0.008926956],"genre_scores_gemma":[0.98247033,0.00023322308,0.015175248,0.000050094317,0.000006886645,0.00004354358,0.00017502569,0.000022549517,0.0018230513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978656,0.00007514652,0.0000058198984,0.000052342486,0.000028181663,0.000052042145],"domain_scores_gemma":[0.99930215,0.00047773178,0.00009131868,0.000020162663,0.000070938,0.000037733244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005265308,0.0005915054,0.0005171179,0.00034104948,0.00039771575,0.00063623005,0.0008543073,0.00090670824,0.001584682],"category_scores_gemma":[0.0017996612,0.00040365118,0.00047124785,0.0005635459,0.0006675177,0.0012228738,0.0006172445,0.0006336322,0.00009757266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024461893,0.000008776433,0.00031660617,0.000016414622,0.0000056786093,0.000044328863,0.0000113700335,0.99498284,0.00032041335,0.0021400682,0.0001504191,0.0019785932],"study_design_scores_gemma":[0.0000037516193,0.000013442293,0.00013455871,0.0000024323388,0.000002706257,0.0000074875234,0.000021263291,0.99795306,0.00017512597,0.001551522,0.00013236799,0.000002155504],"about_ca_topic_score_codex":0.018125162,"about_ca_topic_score_gemma":0.014441464,"teacher_disagreement_score":0.018125162,"about_ca_system_score_codex":0.0018962829,"about_ca_system_score_gemma":0.00078968384,"threshold_uncertainty_score":0.036039352},"labels":[],"label_agreement":null},{"id":"W3008406652","doi":"10.1007/978-3-030-31399-9_2","title":"Comprehensive Modeling of Demand Response Programs","year":2020,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Demand response; Market clearing; Electricity; Computer science; Clearing; Reduction (mathematics); Consumption (sociology); Nonlinear system; Electricity market; Electric power system; Operations research; Mathematical optimization; Environmental economics; Econometrics; Power (physics); Economics; Microeconomics; Engineering; Mathematics","score_opus":0.034008281068250205,"score_gpt":0.20431052697554766,"score_spread":0.17030224590729745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008406652","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018204866,0.0023501222,0.5992147,0.002101927,0.00033981533,0.00008332038,0.0022766157,0.0010842668,0.37434444],"genre_scores_gemma":[0.54514736,0.0058750184,0.09216839,0.00055678113,0.0002726029,0.00034468004,0.00257088,0.0011119174,0.3519523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998073,0.00005269055,0.00000538912,0.000029591189,0.0000718102,0.00003318528],"domain_scores_gemma":[0.99978465,0.00010674598,0.000013003813,0.000028753451,0.00005173771,0.000015183277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002806789,0.00060957595,0.00059154513,0.00034476034,0.00033330737,0.0013773986,0.001305049,0.0008673014,0.017491855],"category_scores_gemma":[0.0010587253,0.0004640398,0.0005596365,0.000719667,0.00036001144,0.0016617348,0.0006179803,0.0011037657,0.0027650846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012330521,0.000042334515,0.00016229409,0.00004455539,0.0000101018495,0.000028171597,0.000032230924,0.83542967,0.00033779538,0.1287767,0.011338007,0.023785757],"study_design_scores_gemma":[0.0000039613437,0.000006573199,0.00014935754,0.000016254959,0.0000045575703,0.000015257078,0.00001859305,0.9169539,0.00020394343,0.06715393,0.015466595,0.0000070235883],"about_ca_topic_score_codex":0.016202135,"about_ca_topic_score_gemma":0.017891997,"teacher_disagreement_score":0.017491855,"about_ca_system_score_codex":0.0014645953,"about_ca_system_score_gemma":0.0013670023,"threshold_uncertainty_score":0.058516085},"labels":[],"label_agreement":null},{"id":"W3009668591","doi":"10.1016/j.epsr.2020.106275","title":"Positive demand response and multi-hour net benefit test","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Market demand schedule; Derived demand; Peak demand; Economics; Demand management; Demand curve; Load management; Incentive; Demand forecasting; Microeconomics; Electricity; Operations management; Engineering","score_opus":0.030585730594881573,"score_gpt":0.27596213171276224,"score_spread":0.24537640111788067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009668591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9748556,0.000040871062,0.012130838,0.00040866755,0.00011366929,0.000073675896,0.0008499954,0.00020396474,0.011322744],"genre_scores_gemma":[0.99793446,0.0000046361865,0.0008148445,0.00003892835,0.00000679345,0.000030528998,0.00013371563,0.00001587925,0.0010202453],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983512,0.00090110226,0.000038293245,0.00013825271,0.00024135051,0.0003297112],"domain_scores_gemma":[0.9816791,0.015618965,0.00060552196,0.00094749837,0.0006744761,0.00047439506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003097134,0.00045923982,0.00059835246,0.00037228758,0.00026686536,0.0005556335,0.0010256345,0.0010515507,0.008090902],"category_scores_gemma":[0.0116797695,0.0001621356,0.00043425284,0.00034008568,0.0005880447,0.001015524,0.0006193296,0.0008289025,0.0004981941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.02873989,0.003729625,0.02832187,0.0003521854,0.00041832987,0.0012651215,0.0005014642,0.8218549,0.030315474,0.03486713,0.009700838,0.03993323],"study_design_scores_gemma":[0.000491734,0.00411568,0.014444779,0.00001266936,0.00010147979,0.0002517673,0.00055862643,0.95058745,0.016250376,0.01172229,0.001376784,0.00008652917],"about_ca_topic_score_codex":0.0019063661,"about_ca_topic_score_gemma":0.0010030943,"teacher_disagreement_score":0.008090902,"about_ca_system_score_codex":0.000566668,"about_ca_system_score_gemma":0.00052984775,"threshold_uncertainty_score":0.027066827},"labels":[],"label_agreement":null},{"id":"W3011452552","doi":"10.1109/isgt-europe47291.2020.9248831","title":"Privacy-Cost Management in Smart Meters Using Deep Reinforcement Learning","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"European Commission; Natural Sciences and Engineering Research Council of Canada; McGill University","keywords":"Reinforcement learning; Computer science; Smart grid; Electricity; Occupancy; Battery (electricity); Energy management; Computer security; Deep learning; Information privacy; Energy (signal processing); Artificial intelligence; Engineering; Power (physics)","score_opus":0.024579589175890974,"score_gpt":0.2187404623033756,"score_spread":0.19416087312748462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011452552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08546558,0.0005851411,0.9107101,0.0007294255,0.000052599433,0.00006350575,0.00009347461,0.0006307606,0.0016694972],"genre_scores_gemma":[0.96804035,0.00010001683,0.03067526,0.00012751557,0.000023995228,0.000045297977,0.000060781353,0.000026056186,0.0009006422],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989349,0.00045908903,0.000045840585,0.00021916717,0.00018399786,0.00015702115],"domain_scores_gemma":[0.9957712,0.003164237,0.00035075983,0.00023276304,0.0003442386,0.00013672137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002274156,0.00073020475,0.0011144116,0.000314773,0.00034019124,0.0009507771,0.0012910019,0.0010588337,0.0013893567],"category_scores_gemma":[0.006920109,0.00038290577,0.0003712486,0.0004409275,0.001004926,0.0017599185,0.0013032834,0.001663222,0.00016867238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014008759,0.00010435245,0.0012187404,0.000052494637,0.00003196349,0.00006360683,0.000048976508,0.952014,0.00074081385,0.007292438,0.0007463191,0.037546147],"study_design_scores_gemma":[0.000005056856,0.000011816951,0.000044467728,0.0000016744855,0.0000016361173,0.000003697382,0.000002280286,0.99757344,0.000136912,0.0021664237,0.000051121508,0.000001440367],"about_ca_topic_score_codex":0.0045212945,"about_ca_topic_score_gemma":0.0037409323,"teacher_disagreement_score":0.0045212945,"about_ca_system_score_codex":0.0014248359,"about_ca_system_score_gemma":0.0014564922,"threshold_uncertainty_score":0.012027025},"labels":[],"label_agreement":null},{"id":"W3011631033","doi":"10.1109/indicon47234.2019.9030372","title":"An Automatic State Detection Algorithm for Non-intrusive Load Monitoring","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; MATLAB; State (computer science); Real-time computing; Knowledge base; Energy consumption; Base (topology); Scale (ratio); Energy (signal processing); Data mining; Algorithm; Artificial intelligence; Engineering; Operating system","score_opus":0.004541165085660206,"score_gpt":0.2095632955153198,"score_spread":0.20502213042965958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011631033","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010412488,0.00018917564,0.98326576,0.00006782168,0.000045301116,0.00007453572,0.00015348733,0.0045982357,0.0011932228],"genre_scores_gemma":[0.4304455,0.0003059298,0.56390435,0.00016583601,0.00007743434,0.00033688257,0.0010958776,0.00017699509,0.003491245],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994155,0.000053309974,0.000050845163,0.00021157016,0.0002104266,0.00005833603],"domain_scores_gemma":[0.99921906,0.00032678622,0.00010703239,0.00011125521,0.0002111561,0.000024643967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054394803,0.00080960506,0.0009457051,0.0016511776,0.0005574522,0.00095055875,0.0013395062,0.0007606825,0.0023405657],"category_scores_gemma":[0.002602065,0.00034294,0.0005481868,0.0010154248,0.00034789462,0.0013282779,0.0008799973,0.0011032425,0.0011631752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020150529,0.0002768767,0.002047944,0.00012812034,0.00006382774,0.00013215796,0.00012913272,0.08269174,0.01414216,0.0050841644,0.00503967,0.89006263],"study_design_scores_gemma":[0.000015358855,0.00004329242,0.0009051119,0.000013201717,0.000013571267,0.00008325127,0.0000169248,0.9864711,0.0070321583,0.0032514217,0.002139889,0.0000146472075],"about_ca_topic_score_codex":0.003787526,"about_ca_topic_score_gemma":0.004194501,"teacher_disagreement_score":0.003787526,"about_ca_system_score_codex":0.00053652463,"about_ca_system_score_gemma":0.0008626464,"threshold_uncertainty_score":0.007829964},"labels":[],"label_agreement":null},{"id":"W3011707620","doi":"10.1109/tsg.2020.2979435","title":"Demand Response Cooperative and Demand Charge","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Schedule; Mathematical optimization; Operations research; Electricity market; Electricity; Probabilistic logic; Scheduling (production processes); Computer science; Linear programming; Piecewise linear function; Stochastic optimization; Engineering; Mathematics; Electrical engineering","score_opus":0.01445524530868801,"score_gpt":0.20559825886100455,"score_spread":0.19114301355231655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011707620","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090615556,0.00038058124,0.81399035,0.0020611205,0.0002044514,0.00021937407,0.00038292402,0.00044597176,0.09169967],"genre_scores_gemma":[0.936433,0.00020734736,0.028721554,0.00039133296,0.00010756158,0.00015138814,0.00019537682,0.00008361993,0.033708803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832016,0.0005280672,0.000041099407,0.00035739673,0.00044046892,0.00031278277],"domain_scores_gemma":[0.9987502,0.0004361535,0.00023801424,0.0002019856,0.000263689,0.00010995579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00124368,0.00075321965,0.0006545678,0.00028706912,0.0005916514,0.0018159818,0.0017802633,0.0013856309,0.016575431],"category_scores_gemma":[0.0033357462,0.00034620063,0.00078966015,0.00074219017,0.0008820918,0.002836581,0.0017304799,0.0013525035,0.0017795338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002751343,0.0002856092,0.0026088266,0.00021314084,0.000053376763,0.0007179804,0.00038570058,0.49524072,0.0053944313,0.43904197,0.0106705865,0.045112584],"study_design_scores_gemma":[0.00006799823,0.00030298388,0.0011165928,0.000019832976,0.000037640828,0.0005881405,0.00032363372,0.88223827,0.0021242036,0.08992581,0.023212971,0.000041887943],"about_ca_topic_score_codex":0.0028649892,"about_ca_topic_score_gemma":0.0020047077,"teacher_disagreement_score":0.016575431,"about_ca_system_score_codex":0.0012791771,"about_ca_system_score_gemma":0.0011875174,"threshold_uncertainty_score":0.05545032},"labels":[],"label_agreement":null},{"id":"W3011730150","doi":"10.1109/cdc40024.2019.9029166","title":"A PID controller for Direct Load Control of Thermostatically Controlled Appliances","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; PID controller; Computer science; Automatic Generation Control; Electric power system; Control engineering; Grid; Renewable energy; Controller (irrigation); Electricity; Load regulation; Control system; Automotive engineering; Control theory (sociology); Control (management); Engineering; Power (physics); Temperature control; Voltage; Electrical engineering","score_opus":0.004391623143944244,"score_gpt":0.18953896604487597,"score_spread":0.1851473429009317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011730150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017752014,0.0005636621,0.96126896,0.00015639074,0.00047547036,0.0002515544,0.00008777654,0.0034634052,0.01598064],"genre_scores_gemma":[0.9237597,0.00030087438,0.06465641,0.00012101019,0.00010537357,0.0002557348,0.00008925719,0.00007204277,0.010639559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956816,0.00004944324,0.000029353967,0.00012147206,0.00020030949,0.000031250234],"domain_scores_gemma":[0.99970275,0.00007203032,0.00003586871,0.000032168395,0.00014423284,0.000012979048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042434162,0.00060916936,0.00058730197,0.0003948774,0.0005879505,0.0012129095,0.0012730306,0.00067505526,0.003825403],"category_scores_gemma":[0.0008051594,0.000288749,0.0004413602,0.00026632065,0.00043371978,0.0005881094,0.00036311208,0.0009475134,0.0010693591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007503885,0.0004947624,0.001312362,0.00090642663,0.0001661714,0.0005795219,0.00042614673,0.51660657,0.122335605,0.016374841,0.008438369,0.33160883],"study_design_scores_gemma":[0.000071647235,0.00028956623,0.0003991028,0.000021702806,0.000029443,0.00012290319,0.000012431665,0.9794821,0.0125678405,0.0007816424,0.0061964556,0.000025143856],"about_ca_topic_score_codex":0.0034339943,"about_ca_topic_score_gemma":0.002930837,"teacher_disagreement_score":0.003825403,"about_ca_system_score_codex":0.000588902,"about_ca_system_score_gemma":0.00072612934,"threshold_uncertainty_score":0.012797236},"labels":[],"label_agreement":null},{"id":"W3011864134","doi":"10.5383/juspn.12.02.003","title":"A Scalable Digital Infrastructure for Sustainable Energy Grid Enabled by Distributed Ledger Technology","year":2020,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distributed ledger; Scalability; Sustainable energy; Grid; Computer science; Ledger; Blockchain; Distributed computing; Environmental economics; Business; Database; Electrical engineering; Computer security; Engineering; Renewable energy; Finance; Geology; Economics","score_opus":0.003801615058983421,"score_gpt":0.17203958219049942,"score_spread":0.168237967131516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011864134","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03852282,0.0006947892,0.8818408,0.003428814,0.0003513391,0.00025964505,0.00027479854,0.0029580756,0.07166893],"genre_scores_gemma":[0.72792596,0.0014749647,0.2469382,0.00048617373,0.00013002906,0.00031764852,0.0006272023,0.00021920099,0.021880593],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997441,0.000050202154,0.000015343036,0.000043932407,0.00010460663,0.000041695683],"domain_scores_gemma":[0.9997209,0.00004909395,0.00002474711,0.00007069239,0.00008846136,0.000046135774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005155745,0.0003084877,0.0002656137,0.00053172983,0.0006149515,0.0016631372,0.000990675,0.00073899596,0.0073914113],"category_scores_gemma":[0.00080126425,0.00019037194,0.00035401003,0.0008878037,0.0007694191,0.0037673318,0.002060344,0.00088419934,0.0013162775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091210655,0.00013166363,0.0008538678,0.00022408616,0.000034086475,0.00053284987,0.00020924349,0.10068537,0.01690267,0.7233133,0.015905794,0.14111592],"study_design_scores_gemma":[0.00009445437,0.00021744994,0.0007480126,0.0001060642,0.000036649006,0.000409504,0.0003290054,0.46733484,0.012074685,0.2876103,0.23098128,0.000057762318],"about_ca_topic_score_codex":0.0011640509,"about_ca_topic_score_gemma":0.0018914352,"teacher_disagreement_score":0.0073914113,"about_ca_system_score_codex":0.001205046,"about_ca_system_score_gemma":0.0013984644,"threshold_uncertainty_score":0.024726748},"labels":[],"label_agreement":null},{"id":"W3012119204","doi":"10.23977/isspj.2020.51004","title":"A method of electricity consumption behaviour clustering and pricing packages based on data mining","year":2020,"lang":"en","type":"article","venue":"Information Systems and Signal Processing Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cluster analysis; Electricity; Computer science; Consumption (sociology); Subdivision; Data mining; Electricity pricing; Construct (python library); Service (business); Electricity market; Machine learning; Engineering; Business","score_opus":0.039653960006263395,"score_gpt":0.2635868137969125,"score_spread":0.22393285379064912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3012119204","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020619186,0.00012732256,0.9958293,0.00009183093,0.000044403616,0.00006927995,0.00014528414,0.00050446694,0.0011262596],"genre_scores_gemma":[0.10003525,0.00060696545,0.89216846,0.00013740535,0.00014916876,0.00044943448,0.0016032968,0.00023856544,0.004611409],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99760336,0.00036941393,0.00019499067,0.00079787243,0.00093189115,0.00010249097],"domain_scores_gemma":[0.99906725,0.00022902024,0.00007442748,0.00017010463,0.0004228247,0.000036474765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009904362,0.0009933317,0.0012545736,0.0035777483,0.0010451035,0.001687247,0.001879545,0.0008735895,0.002026956],"category_scores_gemma":[0.0037191354,0.0005876586,0.001816682,0.0051707057,0.0005719973,0.002479842,0.0011689261,0.0013637136,0.0014575446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009408151,0.00021308623,0.0054579345,0.00041538625,0.0002657088,0.00013659582,0.00035659815,0.0671948,0.00579984,0.04202757,0.011468373,0.86657006],"study_design_scores_gemma":[0.000033499517,0.000072496005,0.004283778,0.000046128,0.00009689211,0.00041166623,0.00023075838,0.929082,0.0073550832,0.036711693,0.021577654,0.000098388],"about_ca_topic_score_codex":0.008070866,"about_ca_topic_score_gemma":0.0052870763,"teacher_disagreement_score":0.008070866,"about_ca_system_score_codex":0.0011102728,"about_ca_system_score_gemma":0.0018213495,"threshold_uncertainty_score":0.016047776},"labels":[],"label_agreement":null},{"id":"W3013032741","doi":"10.5383/juspn.08.02.004","title":"Complex system modeling and platform implementation for financial risk management in energy markets","year":2017,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Risk management; Nash equilibrium; Computer science; Government (linguistics); Game theory; System dynamics; General partnership; Financial modeling; Risk analysis (engineering); Finance; Business; Economics; Microeconomics","score_opus":0.01937903527095109,"score_gpt":0.24399595943327987,"score_spread":0.22461692416232878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013032741","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012331773,0.000053824784,0.98070073,0.00021694701,0.000046955007,0.00009583134,0.00014869058,0.0015059194,0.004899321],"genre_scores_gemma":[0.46523574,0.00028093916,0.525009,0.000110948145,0.000055044336,0.0005971636,0.00044512266,0.00042993634,0.007836079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954045,0.00016689017,0.00003940579,0.000074061376,0.00013105995,0.000048104863],"domain_scores_gemma":[0.99929523,0.00032744132,0.00006372608,0.00011417685,0.00015854576,0.000040788113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010834845,0.00075173355,0.000545464,0.00046609904,0.00063743844,0.0022260405,0.0011669397,0.0010420965,0.006851454],"category_scores_gemma":[0.0024938057,0.0004087061,0.0011198465,0.00033048465,0.00052371103,0.0014231673,0.001259194,0.0016930954,0.0010176746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005587831,0.00008458772,0.0014140684,0.00008214762,0.00005085231,0.00022922212,0.00027978778,0.8836796,0.0027589188,0.08405231,0.0018010376,0.025511581],"study_design_scores_gemma":[0.000008293116,0.000009023959,0.00006786325,0.0000064112537,0.000006382301,0.000014555704,0.000015068178,0.9892936,0.0006015543,0.0074816,0.0024903526,0.000005438857],"about_ca_topic_score_codex":0.007231819,"about_ca_topic_score_gemma":0.005201047,"teacher_disagreement_score":0.007231819,"about_ca_system_score_codex":0.00076430984,"about_ca_system_score_gemma":0.0015516622,"threshold_uncertainty_score":0.02292043},"labels":[],"label_agreement":null},{"id":"W3013158530","doi":"10.1016/j.energy.2020.118500","title":"Smart Distributed Energy Storage Controller (smartDESC)","year":2020,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Hydro-Québec; Australian Government","keywords":"Computer science; Controller (irrigation); Renewable energy; Scalability; Distributed computing; Energy storage; Anticipation (artificial intelligence); Scale (ratio); Architecture; Smart grid; Power (physics); Engineering; Electrical engineering","score_opus":0.008203547721477066,"score_gpt":0.1662015919873614,"score_spread":0.15799804426588432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013158530","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21998157,0.003036932,0.29018605,0.0020544739,0.0022524828,0.0012320391,0.011432072,0.09101373,0.37881067],"genre_scores_gemma":[0.9204883,0.000326552,0.018060446,0.00067156786,0.00016545196,0.00015589935,0.002530178,0.0004281384,0.057173382],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968886,0.000032968437,0.000021869206,0.00007537113,0.00015392758,0.000026927972],"domain_scores_gemma":[0.9993913,0.000070888185,0.000043261483,0.00013354824,0.00031216934,0.000048891186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002964601,0.00049193285,0.0005490208,0.0006420424,0.0006029808,0.0008711436,0.00079859863,0.00040693022,0.025375959],"category_scores_gemma":[0.00050126604,0.00019073767,0.00019035596,0.00069204293,0.00031199472,0.00075190014,0.0004751916,0.000547472,0.0050680754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016627922,0.0005532311,0.0075217653,0.00083793676,0.0001215044,0.00036774596,0.0002199076,0.029093927,0.06985254,0.02795286,0.24606775,0.61574805],"study_design_scores_gemma":[0.00066030887,0.00085351116,0.009124884,0.00011902545,0.00016690494,0.001262831,0.00013190921,0.32875827,0.1988109,0.013912855,0.44607747,0.0001211094],"about_ca_topic_score_codex":0.0017628982,"about_ca_topic_score_gemma":0.0034538517,"teacher_disagreement_score":0.025375959,"about_ca_system_score_codex":0.0006511773,"about_ca_system_score_gemma":0.00076503237,"threshold_uncertainty_score":0.08489102},"labels":[],"label_agreement":null},{"id":"W3013357131","doi":"10.1109/access.2020.2982398","title":"A Practical Approach to Residential Appliances on-Line Anomaly Detection: A Case Study of Standard and Smart Refrigerators","year":2020,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Anomaly detection; Computer science; Anomaly (physics); Energy consumption; Set (abstract data type); Energy (signal processing); Construct (python library); Reliability engineering; Data mining; Real-time computing; Engineering","score_opus":0.07638163504817307,"score_gpt":0.3263094547186329,"score_spread":0.2499278196704598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013357131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9126069,0.0004985466,0.075842194,0.00080357044,0.000044738314,0.00028034637,0.00030927177,0.0002828994,0.009331569],"genre_scores_gemma":[0.97112286,0.00022754415,0.025664466,0.000044173416,0.000023462204,0.0000552907,0.00015064023,0.000018175422,0.0026932843],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99882287,0.00046413922,0.00005680741,0.0001875688,0.0003564934,0.00011213381],"domain_scores_gemma":[0.99858344,0.0007024353,0.00012998555,0.0001967688,0.00030492689,0.000082361395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085381663,0.00046994892,0.00037792657,0.00094656734,0.00064458867,0.0008612568,0.0011366972,0.001492467,0.0012228446],"category_scores_gemma":[0.002156525,0.00017281626,0.00043608947,0.0010074322,0.000737437,0.00089777634,0.00071303867,0.000537334,0.00023449013],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012768266,0.0033633243,0.16610305,0.0011826749,0.00023651498,0.039906107,0.0055595315,0.33414754,0.05328795,0.035834942,0.01143809,0.34766355],"study_design_scores_gemma":[0.00008194194,0.0008895329,0.03490565,0.00005603174,0.00008622959,0.005500902,0.006469379,0.89478475,0.028680334,0.0077531226,0.020717442,0.00007464172],"about_ca_topic_score_codex":0.0058344463,"about_ca_topic_score_gemma":0.007255805,"teacher_disagreement_score":0.0058344463,"about_ca_system_score_codex":0.0007451849,"about_ca_system_score_gemma":0.0004023212,"threshold_uncertainty_score":0.011600971},"labels":[],"label_agreement":null},{"id":"W3014199492","doi":"10.1016/j.enbuild.2020.110027","title":"Towards standardising market-independent indicators for quantifying energy flexibility in buildings","year":2020,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Horizon 2020; Ministerio de Economía y Competitividad; Science Foundation Ireland; European Commission","keywords":"Flexibility (engineering); Robustness (evolution); Smart grid; Environmental economics; Computer science; Grid; Energy market; Risk analysis (engineering); Efficient energy use; Reliability engineering; Engineering; Electricity; Business; Economics; Mathematics","score_opus":0.02073577579565725,"score_gpt":0.24145359643086103,"score_spread":0.2207178206352038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3014199492","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07404727,0.0038892129,0.8929772,0.0012853174,0.00042456613,0.00091811246,0.001922204,0.00081806595,0.023718052],"genre_scores_gemma":[0.44184184,0.0025198597,0.5486479,0.0002316516,0.00015158275,0.0009974962,0.0036833296,0.00026370303,0.0016626331],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9772126,0.00967798,0.0022922372,0.0014735815,0.008768013,0.00057551294],"domain_scores_gemma":[0.95140845,0.016241997,0.008798388,0.006905318,0.0160289,0.0006169616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03733777,0.0020010895,0.0015965962,0.008934936,0.0007693674,0.008512225,0.0026299173,0.0022145093,0.0016635718],"category_scores_gemma":[0.04936873,0.00073440804,0.0019012792,0.010011486,0.0019432044,0.008584662,0.0041268836,0.003615431,0.0006845966],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048126932,0.0011769659,0.075753696,0.0045076534,0.00054171233,0.00027350365,0.001779034,0.22609137,0.026117368,0.23669426,0.008628272,0.41795492],"study_design_scores_gemma":[0.00015029128,0.0016284252,0.10726779,0.004073665,0.00054168934,0.0006930053,0.007491131,0.4969338,0.07536298,0.17220971,0.13272913,0.0009184914],"about_ca_topic_score_codex":0.003752211,"about_ca_topic_score_gemma":0.004139315,"teacher_disagreement_score":0.03733777,"about_ca_system_score_codex":0.0032748063,"about_ca_system_score_gemma":0.004049329,"threshold_uncertainty_score":0.19746333},"labels":[],"label_agreement":null},{"id":"W3015731235","doi":"10.3390/en13071813","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Energy storage; Prosumer; Computer science; Mathematical optimization; Grid; Electricity; Reliability engineering; Environmental economics; Engineering; Power (physics); Production (economics); Electrical engineering; Economics; Mathematics; Microeconomics","score_opus":0.027369907741307327,"score_gpt":0.20839596379554706,"score_spread":0.18102605605423974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015731235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07428416,0.00059163495,0.9162222,0.0005153393,0.000044736298,0.00012250869,0.0002583383,0.00012474875,0.0078363735],"genre_scores_gemma":[0.90988874,0.0006013575,0.085750416,0.00010522168,0.000042084357,0.00025527366,0.00020416379,0.000049614217,0.0031031547],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939394,0.00028333155,0.000023462382,0.000070377515,0.00012263714,0.00010633237],"domain_scores_gemma":[0.9988865,0.0007857884,0.00012554052,0.000025847032,0.000120689365,0.000055597775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011613478,0.001027383,0.0012683572,0.0007322166,0.00042475606,0.0014969519,0.0009169835,0.0010780395,0.0021134927],"category_scores_gemma":[0.0021942589,0.0011845134,0.0009259966,0.0008773985,0.0006463419,0.0009212664,0.00075147,0.0011206692,0.00016483503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007956442,0.0000052109954,0.00007668873,0.000009179476,0.0000069503426,0.000016543729,0.000004689755,0.9973713,0.00008949385,0.0014387505,0.000044352975,0.00092883594],"study_design_scores_gemma":[0.0000032490743,0.000008881176,0.000035196485,0.0000034103596,0.0000037905227,0.0000042207007,0.0000065719546,0.99864477,0.000061320854,0.0011428914,0.000083808714,0.0000018978398],"about_ca_topic_score_codex":0.009523718,"about_ca_topic_score_gemma":0.011063747,"teacher_disagreement_score":0.009523718,"about_ca_system_score_codex":0.0013113855,"about_ca_system_score_gemma":0.0020660344,"threshold_uncertainty_score":0.018936574},"labels":[],"label_agreement":null},{"id":"W3016029633","doi":"10.1109/iciis47346.2019.9063281","title":"Use of Probabilistic Fuzzy Inference Systems to Model Demand Response in the Off-grid Power Systems of Northern Canada","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro; Research Manitoba","keywords":"Probabilistic logic; Demand response; Computer science; Grid; Fuzzy logic; Operations research; Process (computing); Electric power system; Inference; Load management; Power demand; Distributed computing; Real-time computing; Power (physics); Engineering; Artificial intelligence; Power consumption; Electricity; Geography","score_opus":0.015319805949635324,"score_gpt":0.19407456081213115,"score_spread":0.1787547548624958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016029633","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76113534,0.0003553827,0.21639788,0.0005722217,0.000062029925,0.00022238104,0.0025500625,0.00089710206,0.01780758],"genre_scores_gemma":[0.9891728,0.000097986995,0.0074758125,0.000016801467,0.0000046523223,0.000038004426,0.0003351569,0.000014283227,0.0028444978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999764,0.000040426672,0.000013481103,0.00005173072,0.00007436263,0.000055926885],"domain_scores_gemma":[0.99955827,0.00018627406,0.00005011156,0.000017531574,0.00016724385,0.000020406438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048332865,0.00060923555,0.0003894934,0.00044340396,0.0010284504,0.0013334494,0.0011112065,0.0005801973,0.001532288],"category_scores_gemma":[0.0017607101,0.00034344583,0.00041012754,0.00062564237,0.000465304,0.00044985392,0.00035023454,0.0006650353,0.00016142847],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022654685,0.000010044081,0.0012146875,0.000007254101,0.000007978919,0.00002529208,0.000021213638,0.9944905,0.00020829146,0.000680794,0.00015921643,0.003152099],"study_design_scores_gemma":[0.0000021432106,0.000003931958,0.00063240255,0.0000012017853,0.0000028898253,0.0000029534112,0.0000117153295,0.99888486,0.00009285313,0.00025257864,0.00010907549,0.0000034999453],"about_ca_topic_score_codex":0.9034819,"about_ca_topic_score_gemma":0.8515091,"teacher_disagreement_score":0.0965181,"about_ca_system_score_codex":0.006618546,"about_ca_system_score_gemma":0.0059123556,"threshold_uncertainty_score":0.19417298},"labels":[],"label_agreement":null},{"id":"W3016141087","doi":"10.1109/tsg.2020.2986337","title":"A New and Fair Peer-to-Peer Energy Sharing Framework for Energy Buildings","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Science and Technology Project of State Grid; National Natural Science Foundation of China","keywords":"Payment; Environmental economics; Energy consumption; Energy management; Computer science; Efficient energy use; Peer-to-peer; Sustainable development; Nash equilibrium; Game theory; Sharing economy; Energy (signal processing); Microeconomics; Distributed computing; Economics; Engineering","score_opus":0.018107614150469298,"score_gpt":0.22594865624892135,"score_spread":0.20784104209845206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016141087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005772287,0.00016488784,0.9905578,0.00016369019,0.000055181434,0.00012601943,0.000035142086,0.00026150007,0.002863436],"genre_scores_gemma":[0.6307975,0.00038597142,0.36078197,0.00015003578,0.00013346826,0.0003729829,0.00013411233,0.000098580145,0.007145465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983033,0.00054131565,0.00007715848,0.00028720644,0.00061040616,0.00018060321],"domain_scores_gemma":[0.99937314,0.00020490006,0.000051807045,0.00009902642,0.00018529229,0.00008583936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021945043,0.0006781097,0.0010258425,0.0005584552,0.0015113889,0.0015663644,0.0030448907,0.0011343694,0.0028659047],"category_scores_gemma":[0.0027570913,0.00032495437,0.0006771839,0.00084156025,0.00093088933,0.0029615643,0.0022866183,0.0012350854,0.0004959534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018446939,0.0001864671,0.00038187954,0.00015518667,0.00007244551,0.00036079227,0.00042131724,0.52880394,0.00827952,0.35910225,0.0070114317,0.09504028],"study_design_scores_gemma":[0.000027807158,0.00005467792,0.000069383874,0.0000071883564,0.000015298292,0.00009300345,0.000050181883,0.9376339,0.0009418723,0.05401537,0.007067048,0.000024248468],"about_ca_topic_score_codex":0.0035188107,"about_ca_topic_score_gemma":0.0053141178,"teacher_disagreement_score":0.0035188107,"about_ca_system_score_codex":0.0010915649,"about_ca_system_score_gemma":0.001966404,"threshold_uncertainty_score":0.011605799},"labels":[],"label_agreement":null},{"id":"W3016777092","doi":"10.1007/978-981-15-4412-5_3","title":"Intelligent Transmission Scheduling Based on Deep Reinforcement Learning","year":2020,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reinforcement learning; Computer science; Scheduling (production processes); Artificial intelligence; Distributed computing; Engineering; Operations management","score_opus":0.015147032179914914,"score_gpt":0.20844313808553241,"score_spread":0.1932961059056175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016777092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026256556,0.0005787364,0.96429735,0.00031659755,0.00018222067,0.000033116463,0.00006792175,0.001017347,0.007250153],"genre_scores_gemma":[0.92909104,0.00027296797,0.06552253,0.00011301941,0.00007792603,0.000049208393,0.000088965724,0.00010916277,0.004675105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998518,0.00003351857,0.000007599824,0.000035306235,0.000036266003,0.00003543935],"domain_scores_gemma":[0.9994911,0.0002834021,0.00006118488,0.000039663573,0.00008221368,0.000042316507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043730254,0.0005379238,0.00082282495,0.00026236437,0.0002399345,0.00071273634,0.0009238542,0.00053286605,0.0029420126],"category_scores_gemma":[0.0012693765,0.00037343055,0.00028364878,0.00034734549,0.00036981324,0.00064797694,0.0004812966,0.0013313815,0.00039439322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057930865,0.000040172727,0.00018858237,0.000024772602,0.000016547576,0.000020692009,0.000013034254,0.9400259,0.0012761327,0.0042924,0.0015113151,0.052532565],"study_design_scores_gemma":[0.0000023555672,0.0000047372814,0.000018183408,0.0000013798835,0.0000015063328,0.0000023126274,8.04302e-7,0.99871325,0.000108163804,0.0010567609,0.00008959956,9.891347e-7],"about_ca_topic_score_codex":0.006701422,"about_ca_topic_score_gemma":0.00837172,"teacher_disagreement_score":0.006701422,"about_ca_system_score_codex":0.0007492993,"about_ca_system_score_gemma":0.00081560336,"threshold_uncertainty_score":0.013324797},"labels":[],"label_agreement":null},{"id":"W3018966580","doi":"10.1109/isc246665.2019.9071651","title":"Scheduling Electric Vehicles to Chargers through Iterative Double Auction Mechanism","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Double auction; Computer science; Scheduling (production processes); Combinatorial auction; Iterative method; Schedule; Auction algorithm; Mathematical optimization; Auction theory; Common value auction; Revenue equivalence; Algorithm; Microeconomics","score_opus":0.010661788549094844,"score_gpt":0.2117862235324769,"score_spread":0.20112443498338206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018966580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18897085,0.00015581511,0.8044853,0.0001949378,0.0000541862,0.00020801964,0.000073226714,0.0003867853,0.0054708016],"genre_scores_gemma":[0.9381118,0.00006497725,0.059938055,0.000031047923,0.000012283877,0.00011393883,0.00005233302,0.000023608933,0.0016518475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866855,0.0005797136,0.00005485758,0.00016441783,0.00027861554,0.00025386846],"domain_scores_gemma":[0.99808574,0.0009629434,0.00030900695,0.00021433576,0.00026192155,0.00016608548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019747268,0.00065909023,0.0011741846,0.00045093778,0.00045336285,0.0012114756,0.0017861003,0.00078948593,0.0018926527],"category_scores_gemma":[0.0037308428,0.00045408256,0.0006168772,0.0007625159,0.0006486279,0.0012430282,0.0010391452,0.0006541319,0.00023686232],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001571354,0.00010448306,0.0005417176,0.000041104002,0.000037832382,0.00010827087,0.00007540158,0.96681565,0.0025317585,0.010881474,0.0005493956,0.01815576],"study_design_scores_gemma":[0.000046074572,0.000074546944,0.00008540062,0.000001836055,0.0000064197047,0.000029388932,0.000023946046,0.9938547,0.00082318427,0.0046492442,0.00039827303,0.0000069766293],"about_ca_topic_score_codex":0.0020341026,"about_ca_topic_score_gemma":0.0017631893,"teacher_disagreement_score":0.0020341026,"about_ca_system_score_codex":0.00075355713,"about_ca_system_score_gemma":0.001440595,"threshold_uncertainty_score":0.010443509},"labels":[],"label_agreement":null},{"id":"W3019529411","doi":"10.1109/pesgre45664.2020.9070711","title":"Stochastic Optimization for Residential Demand Response under Time of Use","year":2020,"lang":"en","type":"article","venue":"2020 IEEE International Conference on Power Electronics, Smart Grid and Renewable Energy (PESGRE2020)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Computer science; News aggregator; Renewable energy; Load shifting; Tariff; Mathematical optimization; Peak demand; Operations research; Electricity; Electric power system; Stochastic modelling; Energy consumption; Reliability engineering; Power (physics); Engineering; Economics; Electrical engineering","score_opus":0.0172520821095088,"score_gpt":0.22571707337863464,"score_spread":0.20846499126912585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3019529411","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07165957,0.00083679234,0.9111137,0.0013826569,0.00016756007,0.00012415416,0.0007006329,0.00041264514,0.013602241],"genre_scores_gemma":[0.96874017,0.00054092397,0.02002329,0.00018277291,0.000057066012,0.00017131015,0.00037195074,0.00010421289,0.009808344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855095,0.0005993185,0.000050883118,0.00026792727,0.00025294372,0.00027797394],"domain_scores_gemma":[0.997806,0.0013511615,0.0003239749,0.00006289573,0.00033716712,0.00011870364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019965863,0.0014537409,0.0014122261,0.0006349349,0.00047297703,0.0015406096,0.0011123238,0.0014331642,0.0043948875],"category_scores_gemma":[0.0046238946,0.00093070616,0.0012658325,0.00088061555,0.00088326127,0.0010290081,0.0013079123,0.0018061436,0.0004014826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003350026,0.000016844157,0.00023907551,0.000025072599,0.00001746301,0.000046246634,0.000013415762,0.9904649,0.00022614523,0.006953332,0.00046260067,0.0015013561],"study_design_scores_gemma":[0.000004231685,0.000008450317,0.00007512095,0.000001984261,0.0000037493655,0.000003907262,0.0000062575746,0.99821377,0.000031415573,0.0015118002,0.00013665787,0.0000028125244],"about_ca_topic_score_codex":0.017613355,"about_ca_topic_score_gemma":0.009103971,"teacher_disagreement_score":0.017613355,"about_ca_system_score_codex":0.0019337741,"about_ca_system_score_gemma":0.001625795,"threshold_uncertainty_score":0.035021663},"labels":[],"label_agreement":null},{"id":"W3020452024","doi":"10.1109/epec47565.2019.9074794","title":"Locational Marginal Pricing for Distribution Networks: Review and Applications","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Distribution (mathematics); Computer science; Computer network; Mathematics","score_opus":0.004117325955123115,"score_gpt":0.1935815959784452,"score_spread":0.18946427002332208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020452024","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008514807,0.97987235,0.009424336,0.00065252994,0.0003532859,0.000019391915,0.000049542843,0.000025306033,0.008751719],"genre_scores_gemma":[0.018671237,0.97514856,0.003490762,0.00020993737,0.00086267764,0.000019956024,0.00007778068,0.000014723886,0.0015043278],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934083,0.00017351542,0.00006204864,0.00013032915,0.0002446395,0.00004851488],"domain_scores_gemma":[0.9986319,0.00090651243,0.00011702766,0.00005547012,0.0002589789,0.00003013423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012320933,0.0010565434,0.0012702612,0.0017038049,0.00039938246,0.0020837074,0.0016558984,0.0014606633,0.004613928],"category_scores_gemma":[0.002451999,0.0004455001,0.00079240766,0.0058849812,0.0009880926,0.0024988712,0.0007628643,0.0012860267,0.0010878615],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007484141,0.00012691953,0.0006550336,0.01178675,0.00011519184,0.00030802266,0.0001261055,0.015780099,0.00065544166,0.1051645,0.02575498,0.8394521],"study_design_scores_gemma":[0.000025312913,0.00019847152,0.0016336133,0.0053012175,0.00024131591,0.0020532215,0.00026053758,0.017296674,0.0010196664,0.055392977,0.91646594,0.00011092208],"about_ca_topic_score_codex":0.003178988,"about_ca_topic_score_gemma":0.0019378295,"teacher_disagreement_score":0.004613928,"about_ca_system_score_codex":0.0013025189,"about_ca_system_score_gemma":0.0013924729,"threshold_uncertainty_score":0.015435159},"labels":[],"label_agreement":null},{"id":"W3020812033","doi":"10.1109/epec47565.2019.9074814","title":"Optimal Prosumer Asset Planning Considering Energy Storage and PV Units","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Prosumer; Energy storage; Asset (computer security); Photovoltaic system; Computer science; Environmental economics; Renewable energy; Electrical engineering; Engineering; Economics; Computer security","score_opus":0.012774868170095982,"score_gpt":0.1948732361399803,"score_spread":0.18209836796988432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020812033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4028993,0.0011525596,0.55263233,0.00062156667,0.00007284324,0.00023783608,0.0005591959,0.00024160909,0.041582823],"genre_scores_gemma":[0.96233284,0.00026058767,0.032642446,0.0000401202,0.000009932454,0.00011218569,0.000100954465,0.000025025756,0.0044759302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971217,0.00012831084,0.000008429035,0.000036477573,0.00005306555,0.000061465485],"domain_scores_gemma":[0.99968827,0.00019624378,0.000035911184,0.00001055351,0.000043199045,0.000025917388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050639187,0.00072670396,0.00073641137,0.0004964908,0.00034993113,0.0012954972,0.00067702355,0.0008902348,0.0029234525],"category_scores_gemma":[0.0009912791,0.0007682622,0.0004947112,0.00057781464,0.0004158193,0.0009469895,0.0005365315,0.0006749459,0.00020980307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002643699,0.000009780213,0.00014867581,0.000013914942,0.000007848795,0.000054195072,0.000008126258,0.995812,0.00024658852,0.0015101308,0.000111305686,0.0020509586],"study_design_scores_gemma":[0.000006269936,0.000022930602,0.00007874645,0.0000044033345,0.0000065988256,0.000008913051,0.000019722373,0.9982436,0.0002247869,0.0012142541,0.00016697736,0.0000028395978],"about_ca_topic_score_codex":0.0067977956,"about_ca_topic_score_gemma":0.0096157305,"teacher_disagreement_score":0.0067977956,"about_ca_system_score_codex":0.0008851148,"about_ca_system_score_gemma":0.0009770873,"threshold_uncertainty_score":0.013516426},"labels":[],"label_agreement":null},{"id":"W3020843673","doi":"10.1109/mcom.001.2000263","title":"Holistic Privacy for Electricity, Water, and Natural Gas Metering in Next Generation Smart Homes","year":2021,"lang":"en","type":"preprint","venue":"IEEE Communications Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electricity; Computer security; Metering mode; Smart meter; Environmental economics; Scarcity; Computer science; Natural resource; Smart grid; Information privacy; Engineering; Electrical engineering","score_opus":0.07612062575871383,"score_gpt":0.2870588466614142,"score_spread":0.21093822090270037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020843673","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05466503,0.0044502136,0.9069843,0.012943519,0.00030200038,0.00008989566,0.00014851526,0.00041091957,0.020005574],"genre_scores_gemma":[0.9113001,0.002793658,0.08012831,0.0009996215,0.00028968288,0.000063177504,0.000121196215,0.0000491064,0.004255073],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967026,0.0014535366,0.00013471063,0.00041303854,0.0010052465,0.00029074473],"domain_scores_gemma":[0.997421,0.0011444133,0.00023416769,0.00078674173,0.00031145822,0.00010227014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038037207,0.00037490693,0.00052677677,0.00038109114,0.0008883067,0.002984585,0.0007951849,0.0015774694,0.0012826236],"category_scores_gemma":[0.006679686,0.00036163002,0.00060903875,0.00075821293,0.0022117652,0.0072839656,0.0025493624,0.0019713372,0.00029232778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027364676,0.00011809962,0.00332067,0.00027552762,0.0000904469,0.00070003583,0.0009789999,0.06338056,0.008223183,0.72376305,0.010542355,0.1883333],"study_design_scores_gemma":[0.00002651509,0.00014495861,0.002048894,0.0001978651,0.00006967133,0.00092059135,0.00078370946,0.31044325,0.012190828,0.63062024,0.042492222,0.0000612135],"about_ca_topic_score_codex":0.0008493468,"about_ca_topic_score_gemma":0.0007886431,"teacher_disagreement_score":0.0038037207,"about_ca_system_score_codex":0.0014318957,"about_ca_system_score_gemma":0.001545462,"threshold_uncertainty_score":0.02011621},"labels":[],"label_agreement":null},{"id":"W3021677206","doi":"10.1049/iet-rpg.2019.0606","title":"Co‐designed Incentives for an Aimed Renewable Energy Contribution and Volunteer Load Shedding","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Load Shedding; Incentive; Renewable energy; Volunteer; Environmental economics; Business; Computer science; Engineering; Electrical engineering; Economics; Microeconomics; Electric power system; Physics; Power (physics)","score_opus":0.016560812146690803,"score_gpt":0.22736333869851838,"score_spread":0.21080252655182757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021677206","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5020688,0.00019637898,0.460051,0.0010021495,0.00033691485,0.001197405,0.00040332394,0.001028399,0.033715587],"genre_scores_gemma":[0.9769982,0.000026037294,0.020312127,0.000039536753,0.000019782738,0.00014330514,0.00005280128,0.000026373928,0.0023819122],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988483,0.00047036927,0.000060950963,0.0001756075,0.00027351803,0.00017120599],"domain_scores_gemma":[0.9963475,0.0016726671,0.00048682519,0.0005402948,0.00066109415,0.00029160315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002436807,0.0005719793,0.00057959766,0.0004089838,0.00044859663,0.0010469237,0.0010253052,0.0010169094,0.0061275153],"category_scores_gemma":[0.006411721,0.00026775303,0.0003447947,0.00044607293,0.00048907305,0.0013581571,0.0011753567,0.0009749811,0.0006982021],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033335176,0.0024004886,0.015767267,0.00070365565,0.00017621713,0.0008849898,0.00065073476,0.6287329,0.05137286,0.09848357,0.0068181553,0.19067568],"study_design_scores_gemma":[0.00032737703,0.0010776303,0.006639765,0.00006399606,0.00006922522,0.00024226491,0.00029549433,0.9431715,0.013177991,0.022842633,0.012025755,0.00006628677],"about_ca_topic_score_codex":0.00087840436,"about_ca_topic_score_gemma":0.0012015764,"teacher_disagreement_score":0.0061275153,"about_ca_system_score_codex":0.0007036619,"about_ca_system_score_gemma":0.0012697205,"threshold_uncertainty_score":0.020498574},"labels":[],"label_agreement":null},{"id":"W3021984236","doi":"10.1109/isgt45199.2020.9087733","title":"Increasing the Accuracy and Speed of Universal Non-Intrusive Load Monitoring (UNILM) Using a Novel Real- Time Steady-State Block Filter","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Block (permutation group theory); Computer science; Transient (computer programming); Filter (signal processing); Noise (video); SIGNAL (programming language); Real-time computing; Representation (politics); Energy (signal processing); Field (mathematics); Track (disk drive); Moving average; Smart meter; Electricity; Artificial intelligence; Engineering; Computer vision; Mathematics","score_opus":0.019222425840504903,"score_gpt":0.21736872876956614,"score_spread":0.19814630292906124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021984236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04797841,0.0002432276,0.94534224,0.00015453824,0.0000709059,0.000036117406,0.00006582724,0.0042849327,0.0018238027],"genre_scores_gemma":[0.56384045,0.00019997159,0.43177745,0.00012719384,0.000053536583,0.00007056505,0.00028609828,0.0002814085,0.0033633674],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994887,0.00009190341,0.000033925873,0.00013614488,0.0002014343,0.000047774756],"domain_scores_gemma":[0.99855036,0.00069779047,0.00014222365,0.0002741469,0.0003041579,0.000031322823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001034905,0.00053407275,0.00049807376,0.00055153767,0.00025368578,0.00065238675,0.00057742326,0.00057097897,0.0018293199],"category_scores_gemma":[0.0038369934,0.00021998065,0.00019988764,0.0003835078,0.0002216202,0.001003141,0.0004967639,0.0005616142,0.00094495446],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006338705,0.00019254249,0.006065749,0.00019637468,0.00007395778,0.00006906995,0.00019654892,0.069347315,0.14677721,0.0036290125,0.003044475,0.7697739],"study_design_scores_gemma":[0.00002666849,0.00010517118,0.0025707555,0.000013412739,0.000016268436,0.000091827416,0.000019230716,0.9406587,0.05321119,0.00058237923,0.002684841,0.000019529942],"about_ca_topic_score_codex":0.0023844922,"about_ca_topic_score_gemma":0.0038387873,"teacher_disagreement_score":0.0023844922,"about_ca_system_score_codex":0.0003875733,"about_ca_system_score_gemma":0.0005242972,"threshold_uncertainty_score":0.006119728},"labels":[],"label_agreement":null},{"id":"W3024223789","doi":"10.1149/ma2020-013517mtgabs","title":"An Evaluation of Storage for Commercial Scale Demand Charge Management in British Columbia","year":2020,"lang":"en","type":"article","venue":"ECS Meeting Abstracts","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Tariff; Battery (electricity); Environmental economics; Energy storage; Peak demand; Renewable energy; Service (business); Business; Operations management; Environmental science; Electrical engineering; Economics; Engineering; Power (physics); Electricity","score_opus":0.0227899898075387,"score_gpt":0.24345288998011244,"score_spread":0.22066290017257373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024223789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9802663,0.00029686198,0.00058449036,0.00022762327,0.000017127582,0.00017614508,0.00083102396,0.00014070806,0.017459659],"genre_scores_gemma":[0.99256027,0.00017422198,0.00039779738,0.000022416043,0.0000020623102,0.000026794713,0.00042774057,0.000013176517,0.006375565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99957806,0.00006598154,0.000019596735,0.000047084017,0.00017536212,0.00011392416],"domain_scores_gemma":[0.9990388,0.00018648805,0.00003061608,0.00004595891,0.00061108544,0.000087125394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055078615,0.00058263895,0.00037158004,0.00060092745,0.0012539272,0.0014829864,0.0011853012,0.0004758058,0.0067938045],"category_scores_gemma":[0.0012911181,0.00025740836,0.00021793846,0.0012472746,0.00058081007,0.0007304477,0.00046296394,0.00034033819,0.00050082355],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.018158324,0.0034516968,0.07833783,0.0024639047,0.00040256715,0.0028993336,0.0010578906,0.45288706,0.10101968,0.008403555,0.03011014,0.30080795],"study_design_scores_gemma":[0.002269574,0.011950625,0.19124773,0.0002737796,0.00056899665,0.00054400344,0.0068274103,0.62537825,0.12031411,0.0020829316,0.03822821,0.00031441863],"about_ca_topic_score_codex":0.68376446,"about_ca_topic_score_gemma":0.75476813,"teacher_disagreement_score":0.31623554,"about_ca_system_score_codex":0.013732605,"about_ca_system_score_gemma":0.0049084113,"threshold_uncertainty_score":0.6361958},"labels":[],"label_agreement":null},{"id":"W3024832742","doi":"10.3390/su12104053","title":"Powering the Commercial Sector in Nigeria Using Urban Swarm Solar Electrification","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Electrification; Electricity; Business; Quarter (Canadian coin); Obstacle; Constraint (computer-aided design); Rural electrification; Electricity retailing; Environmental economics; Photovoltaic system; Grid; Natural resource economics; Industrial organization; Economics; Electricity market; Engineering; Electrical engineering; Geography","score_opus":0.014460697524094075,"score_gpt":0.22399343010051406,"score_spread":0.20953273257642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024832742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7724405,0.0010981947,0.025463866,0.002319762,0.00005700161,0.00012968724,0.000078005934,0.00007013002,0.1983428],"genre_scores_gemma":[0.9910965,0.0007488765,0.0029083416,0.000037517886,0.000004424435,0.000012567433,0.00002052629,0.000003997056,0.005167371],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99993515,0.000022153055,0.000003626935,0.000007759845,0.000016698976,0.000014697047],"domain_scores_gemma":[0.9999423,0.000015006807,0.000012121029,0.0000055222545,0.000014712227,0.000010288966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013955806,0.00014072117,0.00006711669,0.00021698076,0.00063947326,0.00089427823,0.0001686489,0.00019791209,0.0021044782],"category_scores_gemma":[0.0001491253,0.00008410192,0.00007982785,0.00033903617,0.00047198645,0.00086467335,0.0007839582,0.0002314526,0.00023628243],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002924326,0.00052116293,0.063475244,0.0012658054,0.000053449185,0.0069043925,0.011330376,0.052293416,0.043488987,0.3645906,0.011001114,0.44478303],"study_design_scores_gemma":[0.00020212808,0.0009314497,0.0686038,0.0019185501,0.00010317098,0.0048074396,0.10513226,0.17735219,0.041125935,0.15337482,0.44634613,0.00010205296],"about_ca_topic_score_codex":0.0027125773,"about_ca_topic_score_gemma":0.009260126,"teacher_disagreement_score":0.0027125773,"about_ca_system_score_codex":0.0004475613,"about_ca_system_score_gemma":0.0006078641,"threshold_uncertainty_score":0.0070402026},"labels":[],"label_agreement":null},{"id":"W3026677425","doi":"10.1007/s13235-020-00357-w","title":"Coupling a Power Dispatch Model with a Wardrop or Mean-Field-Game Equilibrium Model","year":2020,"lang":"en","type":"article","venue":"Dynamic Games and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Mathematical optimization; Variational inequality; Mixed complementarity problem; Nash equilibrium; Heuristics; Supply chain network; Mean field theory; Complementarity (molecular biology); Nonlinear system; Computer science; Mathematics; Supply chain","score_opus":0.009603850456420994,"score_gpt":0.21232499605389654,"score_spread":0.20272114559747556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026677425","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055587225,0.00014654119,0.91220796,0.00086680066,0.00015402677,0.00007830361,0.00019780353,0.0002482749,0.030513074],"genre_scores_gemma":[0.94002056,0.0001889563,0.036147248,0.00016237974,0.000061096405,0.00012283653,0.00013157264,0.000085617176,0.023079874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958867,0.0001840061,0.000014883835,0.00007407639,0.0000814807,0.000056850477],"domain_scores_gemma":[0.99950695,0.00026956716,0.000052719854,0.000034025383,0.000074520256,0.00006226739],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065143703,0.00061042357,0.0013503059,0.00044009832,0.00056980766,0.0017943119,0.001959521,0.001845597,0.007389592],"category_scores_gemma":[0.0019414243,0.00058056734,0.0008148549,0.00071878114,0.0008591335,0.0019773704,0.0012478022,0.0012292292,0.000768995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032055475,0.000043661974,0.00014424848,0.000026066285,0.000026782687,0.00007052471,0.000033849257,0.9164858,0.00043470378,0.07873239,0.0009299218,0.0030399775],"study_design_scores_gemma":[0.000010646384,0.000009365092,0.000026088903,0.0000014407764,0.0000035600806,0.00000880375,0.000006322058,0.9840238,0.000039466096,0.015617676,0.000248735,0.000004166775],"about_ca_topic_score_codex":0.0059009176,"about_ca_topic_score_gemma":0.00399104,"teacher_disagreement_score":0.007389592,"about_ca_system_score_codex":0.0009974308,"about_ca_system_score_gemma":0.0012289826,"threshold_uncertainty_score":0.024720669},"labels":[],"label_agreement":null},{"id":"W3027610032","doi":"10.3390/en13102577","title":"Impact of an Energy Monitoring System on the Energy Efficiency of an Automobile Factory: A Case Study","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"SCADA; Energy consumption; Modbus; Efficient energy use; Factory (object-oriented programming); Energy conservation; Energy management; Energy accounting; Ethernet; Engineering; Embedded system; Energy (signal processing); Automotive engineering; Software; Reliability engineering; Computer science; Operating system; Electrical engineering","score_opus":0.020391068840562028,"score_gpt":0.24411768990964192,"score_spread":0.2237266210690799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3027610032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921227,0.0000826876,0.004621653,0.00011136174,0.000008601902,0.000116252224,0.00009452492,0.000112557806,0.00272971],"genre_scores_gemma":[0.9965281,0.00008536804,0.0024119564,0.000010060803,0.000003397194,0.000023367631,0.000043258082,0.000007586084,0.0008868397],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988103,0.00047885993,0.000070649425,0.00013253881,0.00033097927,0.00017670351],"domain_scores_gemma":[0.9978828,0.0010907613,0.00021609527,0.00026348987,0.00041555648,0.00013129333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013005016,0.00048000863,0.00036450196,0.00068493496,0.00093014777,0.0010787377,0.00081699295,0.001064814,0.0017447352],"category_scores_gemma":[0.0018086762,0.00022809047,0.00043694544,0.00091783976,0.0004987973,0.00086305337,0.0006842816,0.00048574858,0.00029925178],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039608716,0.00922461,0.3266204,0.0017518877,0.00034488263,0.040572166,0.005635174,0.23431948,0.10417634,0.0060009887,0.0042977454,0.26309553],"study_design_scores_gemma":[0.0006068903,0.013348584,0.28332287,0.0002656162,0.0006281833,0.007533511,0.017554317,0.43858224,0.21084455,0.001992794,0.025003813,0.00031663015],"about_ca_topic_score_codex":0.0078936275,"about_ca_topic_score_gemma":0.0062437765,"teacher_disagreement_score":0.0078936275,"about_ca_system_score_codex":0.0012957853,"about_ca_system_score_gemma":0.0007323051,"threshold_uncertainty_score":0.015695333},"labels":[],"label_agreement":null},{"id":"W3029705877","doi":"10.1109/access.2020.2997942","title":"Residential Power Forecasting Based on Affinity Aggregation Spectral Clustering","year":2020,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Cluster analysis; Spectral clustering; Schedule; Autoregressive model; Data mining; Artificial intelligence; Econometrics; Mathematics","score_opus":0.044865113200780314,"score_gpt":0.24619589796644403,"score_spread":0.2013307847656637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3029705877","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25215825,0.0005866374,0.73751545,0.00034649408,0.00009685307,0.00009373812,0.0012025194,0.002583506,0.0054164208],"genre_scores_gemma":[0.9350609,0.00020412407,0.06154103,0.00007157868,0.00005136778,0.000048286547,0.0014619308,0.00006268189,0.001498016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996247,0.000073287694,0.000021082997,0.00011107018,0.00011693462,0.00005287078],"domain_scores_gemma":[0.999283,0.00023137173,0.00008558975,0.00012654063,0.00023830592,0.000035337103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003852318,0.0006195059,0.0006316605,0.0014082454,0.0003902207,0.00055895286,0.0008715982,0.0004646429,0.00074049825],"category_scores_gemma":[0.0020642222,0.00023878907,0.0005287479,0.001724157,0.00018751525,0.000861888,0.00041697596,0.0005597947,0.00044109017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018613641,0.000125045,0.010171397,0.00006478006,0.00008962552,0.000114155504,0.00014294621,0.8197424,0.0032994994,0.0031197413,0.0049715806,0.1579727],"study_design_scores_gemma":[0.0000016458315,0.0000036856845,0.000838317,0.0000018430048,0.0000031174188,0.000008414415,0.000009162779,0.99758804,0.00029214477,0.001031508,0.00021863756,0.0000034355241],"about_ca_topic_score_codex":0.02465658,"about_ca_topic_score_gemma":0.02502284,"teacher_disagreement_score":0.02465658,"about_ca_system_score_codex":0.00070445065,"about_ca_system_score_gemma":0.00048245932,"threshold_uncertainty_score":0.04902613},"labels":[],"label_agreement":null},{"id":"W3031846969","doi":"","title":"Improving electrical power systems reliability through locally controlled distributed curtailable load","year":2000,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Power (physics); Electric power system; Electrical engineering; Engineering","score_opus":0.001532398864862915,"score_gpt":0.1207044735223943,"score_spread":0.11917207465753138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031846969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37622225,0.00072167005,0.5015639,0.0021906896,0.00046968143,0.00036807716,0.000626759,0.026096307,0.09174072],"genre_scores_gemma":[0.9773728,0.00009737414,0.010378802,0.0001067641,0.000056974528,0.000031121424,0.00010430085,0.00026012934,0.011591616],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994271,0.0001245142,0.000026768848,0.000117602234,0.00023777837,0.00006621955],"domain_scores_gemma":[0.997827,0.00048344332,0.0002781231,0.00041774422,0.0008859127,0.00010779782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006906754,0.00057122996,0.0005363955,0.0005494368,0.0010233184,0.001551559,0.001623631,0.00040295973,0.008145701],"category_scores_gemma":[0.0025170436,0.00027247836,0.00023259966,0.0006956036,0.00073942606,0.0011793785,0.0006966906,0.0009875891,0.0019198816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012545773,0.0010504703,0.007401325,0.0005475414,0.000096531934,0.00034808498,0.0009848125,0.34260106,0.14700282,0.014519609,0.035719953,0.44847324],"study_design_scores_gemma":[0.00043859254,0.0008951246,0.014865146,0.00011766074,0.00026748257,0.00024039194,0.0007631262,0.86587006,0.06410785,0.013909374,0.038387988,0.00013722182],"about_ca_topic_score_codex":0.036935527,"about_ca_topic_score_gemma":0.12967016,"teacher_disagreement_score":0.036935527,"about_ca_system_score_codex":0.0021966354,"about_ca_system_score_gemma":0.0020009761,"threshold_uncertainty_score":0.07344109},"labels":[],"label_agreement":null},{"id":"W3032194596","doi":"","title":"A framework for peak shaving through the coordination of smart homes","year":2019,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Bilevel optimization; Heuristic; Work (physics); Computer science; Consumption (sociology); Phase (matter); Operations research; Mathematical optimization; Integer (computer science); Integer programming; Optimization problem; Engineering; Artificial intelligence; Mathematics; Algorithm","score_opus":0.00970233543388319,"score_gpt":0.22375070195863458,"score_spread":0.2140483665247514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3032194596","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035058297,0.00023647588,0.98755115,0.00037453495,0.000051836996,0.000049807622,0.000053515338,0.00016165072,0.0080152415],"genre_scores_gemma":[0.5266589,0.0008022462,0.4587975,0.00016011036,0.00011101335,0.00033745705,0.00015668088,0.0001431353,0.012832879],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99934226,0.000245341,0.000020170724,0.00015049963,0.00013150292,0.00011022408],"domain_scores_gemma":[0.9996766,0.00012926623,0.000035735808,0.000047531223,0.000053890297,0.000057059773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012125099,0.0007723773,0.0007329702,0.0003507252,0.0009001456,0.0019465819,0.0020016818,0.0011850969,0.007716854],"category_scores_gemma":[0.0012798839,0.0004848819,0.0008577225,0.0005474772,0.0014264074,0.0018755356,0.0019492528,0.0014827274,0.00069769326],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035703186,0.000040877338,0.00015968204,0.000061830986,0.000021374435,0.0001112945,0.00013418152,0.62370586,0.00088036875,0.35386768,0.0024924534,0.018488733],"study_design_scores_gemma":[0.000025271991,0.000031302454,0.0000484272,0.000018090019,0.000007592442,0.000025732494,0.000061454906,0.8974538,0.00023657971,0.094326265,0.007754772,0.000010743516],"about_ca_topic_score_codex":0.0078997575,"about_ca_topic_score_gemma":0.009538127,"teacher_disagreement_score":0.0078997575,"about_ca_system_score_codex":0.0016933131,"about_ca_system_score_gemma":0.0025846348,"threshold_uncertainty_score":0.025815487},"labels":[],"label_agreement":null},{"id":"W3033176342","doi":"10.1109/eeeic/icpseurope49358.2020.9160629","title":"Optimal Operation of Home Energy Management Systems in the Presence of the Inverter-based Heating, Ventilation and Air Conditioning System","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"HVAC; Air conditioning; Energy management system; Computer science; Electricity; Scheduling (production processes); Energy management; Automotive engineering; Ventilation (architecture); Inverter; Linear programming; Mathematical optimization; Simulation; Energy (signal processing); Engineering; Electrical engineering; Voltage; Mathematics","score_opus":0.008651215297382862,"score_gpt":0.1779578516203559,"score_spread":0.16930663632297305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033176342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2815,0.00041035778,0.69611675,0.00029045856,0.000056850557,0.000102988226,0.00009579493,0.00029977132,0.021127032],"genre_scores_gemma":[0.99286383,0.000057633988,0.0061845165,0.000008796187,0.000004321931,0.000015722362,0.000012156254,0.0000067320416,0.00084631005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997614,0.00007834743,0.000008602209,0.000041238698,0.000051330953,0.00005910027],"domain_scores_gemma":[0.99989974,0.000041534204,0.00002240395,0.0000060744997,0.000022096696,0.000008118871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032323858,0.0004435369,0.00048745528,0.00018639666,0.00033625326,0.00078434334,0.00035866583,0.00039459686,0.0012600003],"category_scores_gemma":[0.00045021062,0.00022408154,0.00028079667,0.00016879095,0.00030275513,0.00047936893,0.0003641444,0.00037036894,0.000107857166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009339097,0.000040532985,0.00066297164,0.000044787983,0.000023910696,0.000109874934,0.000030127703,0.9783932,0.0049990756,0.0033470583,0.00028884428,0.011966259],"study_design_scores_gemma":[0.0000064254946,0.000048831917,0.00028185963,0.000002537016,0.000009062627,0.000011968797,0.00002294528,0.99778193,0.0008294794,0.00077558245,0.00022661108,0.0000026665987],"about_ca_topic_score_codex":0.0043829526,"about_ca_topic_score_gemma":0.004529034,"teacher_disagreement_score":0.0043829526,"about_ca_system_score_codex":0.0004969427,"about_ca_system_score_gemma":0.0006752995,"threshold_uncertainty_score":0.008714855},"labels":[],"label_agreement":null},{"id":"W3033321370","doi":"10.1109/eeeic/icpseurope49358.2020.9160522","title":"Internet of Things for Power and Energy Systems Applications in Buildings: An Overview","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Computer science; Efficient energy use; Internet of Things; Control (management); Building automation; Software; Systems engineering; Computer security; Engineering; Electrical engineering","score_opus":0.023057935500934747,"score_gpt":0.22738165140140645,"score_spread":0.20432371590047171,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033321370","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036216336,0.840524,0.052612904,0.00392567,0.0048055765,0.00032807095,0.00034309187,0.0006498055,0.0931893],"genre_scores_gemma":[0.012673291,0.905776,0.050630804,0.0019016375,0.002783994,0.0002000986,0.0006846854,0.00015170121,0.025197903],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994562,0.000084033825,0.000052986634,0.000074150405,0.0002841684,0.000048394275],"domain_scores_gemma":[0.99948466,0.00022035776,0.000040087096,0.000033526652,0.00017517041,0.00004630302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075580773,0.0011189027,0.0006496747,0.002730832,0.0005103326,0.0018855823,0.0009222461,0.0023031684,0.0063517084],"category_scores_gemma":[0.0007165014,0.0006278702,0.00079276005,0.00415401,0.00040482037,0.004013134,0.0012381095,0.002260899,0.004267355],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005876072,0.00017472336,0.0008576499,0.0063179038,0.00006144614,0.00045064717,0.00027004734,0.002665681,0.0048547345,0.036688287,0.061182603,0.88641745],"study_design_scores_gemma":[0.000005497067,0.000135855,0.0008908808,0.002199628,0.000036521425,0.0010927788,0.0001943181,0.0022347148,0.000758148,0.009882372,0.9825135,0.000055779037],"about_ca_topic_score_codex":0.0008745585,"about_ca_topic_score_gemma":0.0015544445,"teacher_disagreement_score":0.0063517084,"about_ca_system_score_codex":0.00045691174,"about_ca_system_score_gemma":0.00077047123,"threshold_uncertainty_score":0.021248579},"labels":[],"label_agreement":null},{"id":"W3033651303","doi":"10.1049/iet-gtd.2019.1285","title":"Forecasting and optimisation for microgrid in home energy management systems","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Microgrid; Energy management; Energy management system; Computer science; Reliability engineering; Energy (signal processing); Engineering; Control (management); Artificial intelligence; Mathematics; Statistics","score_opus":0.0258862522338477,"score_gpt":0.19923359849913794,"score_spread":0.17334734626529025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033651303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055955682,0.0016992989,0.9289931,0.0006590556,0.00009232054,0.00007334571,0.00018823062,0.0007288537,0.0116101485],"genre_scores_gemma":[0.9523852,0.0008741122,0.04358157,0.000058278456,0.000045597197,0.00007961893,0.00016927138,0.00005187656,0.0027544408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998518,0.00005816408,0.000009804411,0.000031514817,0.000031407286,0.000017195844],"domain_scores_gemma":[0.99984753,0.000093006274,0.000018656418,0.000011028786,0.000023263014,0.0000065015747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003969273,0.00051434,0.0005984395,0.00030564776,0.00027340764,0.0008028544,0.00035649503,0.00046806812,0.0016792694],"category_scores_gemma":[0.00082471943,0.00023734316,0.00038775677,0.00042742197,0.00024225663,0.000590454,0.00035433145,0.00056399213,0.00024649358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002016433,0.000015469956,0.0004105284,0.000050024755,0.000021527261,0.000018097406,0.00002098327,0.9644374,0.00071326346,0.0027859039,0.0005957292,0.030910868],"study_design_scores_gemma":[0.0000015578785,0.0000069539715,0.00014233305,0.0000037713987,0.0000027825315,0.0000031589807,0.000006174099,0.99794906,0.00016868781,0.0013536349,0.00035989098,0.0000020801162],"about_ca_topic_score_codex":0.008042571,"about_ca_topic_score_gemma":0.006511866,"teacher_disagreement_score":0.008042571,"about_ca_system_score_codex":0.00052504055,"about_ca_system_score_gemma":0.0005901142,"threshold_uncertainty_score":0.015991509},"labels":[],"label_agreement":null},{"id":"W3034416419","doi":"10.1016/j.enbuild.2020.110222","title":"Disaggregation of commercial building end-uses with automation system data","year":2020,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Carleton University","funders":"National Research Council Canada; Natural Resources Canada; Delta","keywords":"Chiller; Electricity; Automation; Electric power distribution; Engineering; Computer science; Automotive engineering; Reliability engineering; Mechanical engineering; Electrical engineering","score_opus":0.015828506094434824,"score_gpt":0.19618470048688139,"score_spread":0.18035619439244657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034416419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74396133,0.0004822434,0.044340722,0.000469888,0.00012609077,0.000115957606,0.18674226,0.0024822522,0.021279272],"genre_scores_gemma":[0.9169522,0.00011967386,0.008455262,0.000045632092,0.000029853627,0.000041942465,0.072032645,0.00013166472,0.0021912034],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932766,0.00009934721,0.000073652904,0.00017782416,0.00022706346,0.0000944762],"domain_scores_gemma":[0.9985821,0.00033909606,0.00013278204,0.0004894924,0.0004100273,0.00004658795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004632783,0.0004073944,0.00045395465,0.0015071708,0.00020471447,0.0011349336,0.00037808387,0.00033965925,0.003624312],"category_scores_gemma":[0.0022969064,0.00025203938,0.000534472,0.0039715813,0.00013513534,0.00086988905,0.0005305831,0.0004314546,0.001575062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010807493,0.0004016365,0.38366795,0.0008019774,0.0011813301,0.0005207987,0.00084661366,0.2836506,0.024095627,0.011460228,0.050955247,0.24133725],"study_design_scores_gemma":[0.000031093503,0.00011043618,0.5445654,0.00007301425,0.00015752936,0.00028063502,0.0008125688,0.34316546,0.020442925,0.0061645336,0.08412622,0.0000702109],"about_ca_topic_score_codex":0.0256965,"about_ca_topic_score_gemma":0.029837448,"teacher_disagreement_score":0.0256965,"about_ca_system_score_codex":0.0005753507,"about_ca_system_score_gemma":0.00041893582,"threshold_uncertainty_score":0.051093817},"labels":[],"label_agreement":null},{"id":"W3035406851","doi":"10.5445/ir/1000120042","title":"Global application, performance and risk analysis of Aquifer Thermal Energy Storage (ATES)","year":2020,"lang":"de","type":"article","venue":"Repository KITopen (Karlsruhe Institute of Technology)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Shandong Jianzhu University; Simon Fraser University","keywords":"Gynecology; Political science; Forestry; Environmental science; Medicine; Geography","score_opus":0.0047492683918198796,"score_gpt":0.1885762260214388,"score_spread":0.18382695762961893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035406851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9431116,0.004693257,0.026083725,0.00090062764,0.000094881834,0.00011053726,0.012952345,0.000530778,0.011522126],"genre_scores_gemma":[0.988981,0.0010595155,0.003906743,0.000030414665,0.000015744274,0.000037281286,0.0043661776,0.00005544305,0.0015476563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995414,0.00013401847,0.000026286365,0.00009438346,0.0001624594,0.000041427833],"domain_scores_gemma":[0.998635,0.0004916826,0.00020437708,0.00012013574,0.00050161366,0.000047111473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018089026,0.0005797609,0.0004529436,0.0014915783,0.00021980244,0.0011201879,0.0003597759,0.0005003373,0.0013822872],"category_scores_gemma":[0.0025260036,0.00015198447,0.0008669887,0.002405892,0.00022374016,0.0007996731,0.0006103759,0.0003274694,0.00035849336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006339071,0.00013011241,0.23319113,0.00070086366,0.00075400766,0.0002836858,0.00022364735,0.61383617,0.0067530917,0.0045446903,0.0061987117,0.13274999],"study_design_scores_gemma":[0.000055445867,0.0010902431,0.28340578,0.0002077477,0.0006198201,0.0002809778,0.0009610014,0.6705517,0.013323381,0.009481474,0.01990071,0.00012171278],"about_ca_topic_score_codex":0.013188962,"about_ca_topic_score_gemma":0.009025166,"teacher_disagreement_score":0.013188962,"about_ca_system_score_codex":0.0012346355,"about_ca_system_score_gemma":0.0006588613,"threshold_uncertainty_score":0.026224375},"labels":[],"label_agreement":null},{"id":"W3035722626","doi":"10.1109/mce.2020.3002483","title":"Home Automation System Coordinator Replacement With One-Touch Network Recommissioning","year":2020,"lang":"en","type":"article","venue":"IEEE Consumer Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Science Foundation Ireland","keywords":"Home automation; Computer science; Architecture; Rendering (computer graphics); Automation; Network architecture; Networking hardware; Telecommunications; Computer network; Computer security; Engineering","score_opus":0.010381713950190859,"score_gpt":0.19096635582642585,"score_spread":0.180584641876235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035722626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55826575,0.0008972667,0.38741094,0.00071018026,0.0005445009,0.00057051313,0.00021594587,0.020829054,0.030555759],"genre_scores_gemma":[0.9697585,0.000066293804,0.026370874,0.00010981573,0.000022593607,0.000042594005,0.0000752538,0.00018182275,0.003372315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984565,0.00056556525,0.00010830381,0.00020633738,0.00040298275,0.00026032966],"domain_scores_gemma":[0.99650383,0.0008418234,0.00028535948,0.0015272787,0.00056296046,0.000278839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017218967,0.00055406045,0.00064425485,0.00034407637,0.000470418,0.0014305646,0.0017688147,0.0006525643,0.006118659],"category_scores_gemma":[0.0036009827,0.00023939315,0.00044413938,0.00029570665,0.0008030889,0.0020473192,0.0015484861,0.0008826775,0.0007736731],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039798897,0.0020474743,0.031257268,0.0011841621,0.00035113294,0.002955308,0.0021248742,0.40094185,0.1328082,0.04239192,0.024983168,0.35497475],"study_design_scores_gemma":[0.0005247453,0.0026632762,0.007889563,0.00008236792,0.00017140743,0.0014254145,0.00045497066,0.8082512,0.12244012,0.0043911864,0.051560152,0.0001455718],"about_ca_topic_score_codex":0.0019797753,"about_ca_topic_score_gemma":0.0025642554,"teacher_disagreement_score":0.006118659,"about_ca_system_score_codex":0.0005733931,"about_ca_system_score_gemma":0.0007938131,"threshold_uncertainty_score":0.02046895},"labels":[],"label_agreement":null},{"id":"W3035840468","doi":"10.34890/833","title":"Transactive Demand Response—Hydro Ottawa Experience","year":2019,"lang":"en","type":"article","venue":"CIRED","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transactive memory; Business; Environmental science; Environmental planning; Computer science; Knowledge management","score_opus":0.005317119503052802,"score_gpt":0.18889264952779775,"score_spread":0.18357553002474494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035840468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47908905,0.0052130297,0.003282847,0.033730946,0.0006553114,0.00029439363,0.002994719,0.00029555545,0.47444406],"genre_scores_gemma":[0.85435957,0.0044988403,0.0019879148,0.0018984064,0.00006525311,0.000067750465,0.00092146563,0.00009501455,0.13610575],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9982482,0.00031556396,0.00007172646,0.0002088523,0.0005721977,0.00058351725],"domain_scores_gemma":[0.9979108,0.000386267,0.000114074785,0.00017745353,0.0005961198,0.0008152538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020483756,0.00033886055,0.0002118993,0.00034224807,0.0045009493,0.003911391,0.0011798767,0.0010090095,0.015381488],"category_scores_gemma":[0.0019959414,0.00037552987,0.0002209676,0.0012433898,0.0027564387,0.0027083806,0.0035310006,0.0017595139,0.0013709135],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037646359,0.0016027037,0.0676868,0.0015935296,0.00016099181,0.012502125,0.10007291,0.016804347,0.018278744,0.1894757,0.2992962,0.2887613],"study_design_scores_gemma":[0.00013058048,0.00043078823,0.018774847,0.00018498882,0.000028620781,0.0007371686,0.047588468,0.0022621027,0.003412847,0.0028304611,0.92343235,0.00018685179],"about_ca_topic_score_codex":0.7756111,"about_ca_topic_score_gemma":0.8840529,"teacher_disagreement_score":0.7756111,"about_ca_system_score_codex":0.020813292,"about_ca_system_score_gemma":0.02251597,"threshold_uncertainty_score":0.45142072},"labels":[],"label_agreement":null},{"id":"W3036826955","doi":"10.18280/ijsdp.150417","title":"Method for Forecasting Electric Consumption for Household Users in the Conditions of the Republic of Tajikistan","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Consumption (sociology); The Republic; Agricultural economics; Environmental economics; Electric vehicle; Business; Environmental science; Natural resource economics; Economics; Sociology; Social science","score_opus":0.050023480333521254,"score_gpt":0.2738389624149991,"score_spread":0.22381548208147786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036826955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53115016,0.00032791044,0.45592493,0.00019820305,0.000099517914,0.00021145873,0.0022229094,0.0018283846,0.008036489],"genre_scores_gemma":[0.94068825,0.000170759,0.05676743,0.000017055465,0.000013047393,0.00011528321,0.00080077455,0.0000179944,0.0014094915],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999231,0.000015874853,0.000005388079,0.000023059807,0.000022356237,0.000010222954],"domain_scores_gemma":[0.9998634,0.00004799208,0.000016332548,0.000011990551,0.000053789143,0.0000065727113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021485618,0.0004157321,0.00026683483,0.0008122931,0.00025460994,0.00038622908,0.00032731553,0.00023621754,0.0010316396],"category_scores_gemma":[0.0006656922,0.0001242846,0.00026184108,0.0007122193,0.000066381894,0.00027663275,0.00015357014,0.00024176123,0.00027185792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034005314,0.0003048772,0.13694182,0.00019989969,0.00018705484,0.00030720423,0.00028614502,0.41192377,0.013948447,0.0021597734,0.004736798,0.42866418],"study_design_scores_gemma":[0.00001305223,0.0000604461,0.022686088,0.000012398826,0.000031396998,0.000059300826,0.00012409383,0.9726705,0.0027374923,0.00042130885,0.0011675673,0.000016413562],"about_ca_topic_score_codex":0.01251321,"about_ca_topic_score_gemma":0.015945507,"teacher_disagreement_score":0.01251321,"about_ca_system_score_codex":0.00028341686,"about_ca_system_score_gemma":0.00045370593,"threshold_uncertainty_score":0.024880767},"labels":[],"label_agreement":null},{"id":"W3036863675","doi":"10.1109/giots49054.2020.9119669","title":"Survey of Internet of Things (IoT) Infrastructures for Building Energy Systems","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Internet of Things; Computer science; Efficient energy use; Building automation; Control (management); Data science; Software; Data collection; Systems engineering; Computer security; Architectural engineering; Risk analysis (engineering); Engineering; Artificial intelligence","score_opus":0.016012163817451977,"score_gpt":0.20441901384207037,"score_spread":0.18840685002461838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036863675","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028865326,0.8452286,0.025168773,0.007608714,0.0013258625,0.00023624337,0.0010866717,0.00018708377,0.09029272],"genre_scores_gemma":[0.08306254,0.8963332,0.012169396,0.0012562477,0.0004502599,0.00010640686,0.0012880353,0.000041518197,0.005292341],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980819,0.0005177676,0.00024315418,0.00014372266,0.0008814053,0.00013194268],"domain_scores_gemma":[0.99534035,0.0027686518,0.00042432055,0.0001889193,0.0011545625,0.00012310306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018404495,0.0006566243,0.00044704156,0.0054485304,0.00057511445,0.0016625925,0.0005123216,0.0007739393,0.0037989286],"category_scores_gemma":[0.004090985,0.00038954354,0.00054566993,0.011156232,0.0004313594,0.0032054773,0.0007794162,0.0008305178,0.000775305],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006739261,0.00008000964,0.009270803,0.012623986,0.00007527853,0.00023120866,0.0006078532,0.0049185944,0.0022667053,0.045211315,0.028168341,0.89647853],"study_design_scores_gemma":[0.000003003717,0.00016057743,0.01928992,0.0057023754,0.000079406425,0.00076297333,0.0015083163,0.0015968757,0.0012565,0.0054965895,0.964104,0.00003947312],"about_ca_topic_score_codex":0.0025983069,"about_ca_topic_score_gemma":0.0043143583,"teacher_disagreement_score":0.0054485304,"about_ca_system_score_codex":0.0011092182,"about_ca_system_score_gemma":0.0017484489,"threshold_uncertainty_score":0.012708664},"labels":[],"label_agreement":null},{"id":"W3041031172","doi":"","title":"Distributed energy resources in practice: A case study analysis and \\nvalidation of LBNL's customer adoption model","year":2003,"lang":"en","type":"report","venue":"eScholarship (California Digital Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mantra Energy Alternatives (Canada)","funders":"","keywords":"Schedule; Computer science; Electricity; Resource (disambiguation); Work (physics); Operations research; Scale (ratio); Sample (material); Industrial engineering; Engineering; Geography","score_opus":0.0171044030990094,"score_gpt":0.23830403004852932,"score_spread":0.22119962694951992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041031172","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93556094,0.00013094369,0.04153396,0.000797494,0.000010190608,0.00026780565,0.00023310534,0.00009033706,0.021375213],"genre_scores_gemma":[0.9763337,0.00010935479,0.021761902,0.000035463996,0.0000038591907,0.0001280669,0.00009763428,0.000015306354,0.0015148148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973732,0.001841951,0.000063802654,0.00021688652,0.00032676323,0.0001773072],"domain_scores_gemma":[0.99269307,0.005875403,0.00031003507,0.00042772113,0.00055804214,0.00013567519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036167128,0.00041121512,0.00036528797,0.0008547788,0.0007392411,0.0019471628,0.0014067823,0.0013805776,0.002083738],"category_scores_gemma":[0.0068184184,0.00033781692,0.0005722353,0.0012551144,0.0009523174,0.0018214276,0.0010018388,0.001144902,0.00020091084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002817228,0.0013009064,0.06349058,0.00017865191,0.00008645132,0.0018130986,0.0028045166,0.7852133,0.0011629132,0.1003332,0.0021821952,0.041152444],"study_design_scores_gemma":[0.000039251434,0.0002498174,0.0044362918,0.000029021017,0.000017118105,0.00023022246,0.0023511194,0.98289835,0.0004537573,0.0062805736,0.0029892558,0.000025174251],"about_ca_topic_score_codex":0.019798389,"about_ca_topic_score_gemma":0.026006768,"teacher_disagreement_score":0.019798389,"about_ca_system_score_codex":0.0034022776,"about_ca_system_score_gemma":0.0011255313,"threshold_uncertainty_score":0.039366305},"labels":[],"label_agreement":null},{"id":"W3042184416","doi":"10.1109/tsg.2020.3007984","title":"A Data-Driven Approach for Generating Synthetic Load Patterns and Usage Habits","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University; Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Leverage (statistics); Smart grid; Machine learning; Smart meter; Artificial intelligence; Grid; Context (archaeology); Generative grammar; Big data; Kernel (algebra); Data modeling; Data science; Distributed computing; Data mining; Engineering; Software engineering","score_opus":0.04003366927041682,"score_gpt":0.22829341603793427,"score_spread":0.18825974676751744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042184416","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13773744,0.00011915058,0.85489476,0.00063486374,0.000118237775,0.00032461432,0.0020614143,0.0012058218,0.0029036272],"genre_scores_gemma":[0.8558401,0.00009948445,0.13863266,0.00015545558,0.00004763171,0.0003811611,0.0033127144,0.00009499629,0.0014357759],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994006,0.00030346843,0.0000272042,0.00012598642,0.00010671302,0.000036006044],"domain_scores_gemma":[0.9964598,0.002386914,0.00026543962,0.00046815048,0.00033397003,0.0000857648],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015878818,0.0005757004,0.00036459754,0.0007306151,0.00027121432,0.0005352752,0.0012042107,0.00087845704,0.0012988311],"category_scores_gemma":[0.006557381,0.00036860755,0.0005435541,0.00079577847,0.0006613299,0.00067154557,0.00072717364,0.0010746855,0.00035551182],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001166497,0.00014156595,0.0038699766,0.00005709927,0.000033353932,0.000080613005,0.000068925794,0.9626095,0.0012630277,0.008379925,0.001706183,0.021673037],"study_design_scores_gemma":[0.000005186713,0.000019307861,0.00035504973,0.0000032394044,0.000002031483,0.000015243363,0.000008060935,0.99592704,0.0006058027,0.002668036,0.0003854863,0.0000053730655],"about_ca_topic_score_codex":0.0034128015,"about_ca_topic_score_gemma":0.0059471102,"teacher_disagreement_score":0.0034128015,"about_ca_system_score_codex":0.00060748187,"about_ca_system_score_gemma":0.0005419147,"threshold_uncertainty_score":0.008397639},"labels":[],"label_agreement":null},{"id":"W3042601164","doi":"10.1109/tsg.2020.3009989","title":"Robust Hierarchical Control Mechanism for Aggregated Thermostatically Controlled Loads","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Control theory (sociology); Tracking error; Computer science; Demand response; Virtual power plant; Electricity; Control (management); Mathematical optimization; Control engineering; Engineering; Distributed generation; Mathematics; Renewable energy","score_opus":0.021814080744134077,"score_gpt":0.20391072231427287,"score_spread":0.1820966415701388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042601164","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03238928,0.00013722011,0.9600544,0.00016262518,0.00007646515,0.00006994201,0.000057762034,0.002206289,0.004845955],"genre_scores_gemma":[0.96813625,0.000049146387,0.028965892,0.00007030301,0.000041317773,0.00007050322,0.000052050305,0.000039036782,0.0025755642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925464,0.00007916477,0.00005205843,0.00024527367,0.00026542062,0.00010348632],"domain_scores_gemma":[0.999255,0.00014798339,0.00015917204,0.00014923682,0.0002433954,0.00004521661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008706669,0.00059533695,0.0004887322,0.0004613474,0.0005459423,0.0012027273,0.001605096,0.00055743067,0.0030521615],"category_scores_gemma":[0.0013134942,0.00020645536,0.00049935223,0.00029030803,0.0005792196,0.000930145,0.0011036368,0.00075507164,0.00055321533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030506673,0.00018093905,0.00088418234,0.00015757422,0.00008701212,0.00029729793,0.00035622797,0.76928234,0.05984472,0.05719157,0.0040140827,0.10739897],"study_design_scores_gemma":[0.0000145096865,0.000054717642,0.0001508194,0.000003630145,0.000009121347,0.000015692152,0.000007820778,0.9930715,0.0030306757,0.0028885612,0.0007428233,0.000010062612],"about_ca_topic_score_codex":0.0048024706,"about_ca_topic_score_gemma":0.0035443958,"teacher_disagreement_score":0.0048024706,"about_ca_system_score_codex":0.00091288367,"about_ca_system_score_gemma":0.0008034674,"threshold_uncertainty_score":0.010210514},"labels":[],"label_agreement":null},{"id":"W3043751588","doi":"10.2316/j.2020.203-0192","title":"WIND/FUEL CELL HYBRID SYSTEM BASED ON ANFIS-HLMS CONTROL ALGORITHM FOR VSC","year":2020,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fuel cells; Computer science; Control (management); Algorithm; Automotive engineering; Environmental science; Control theory (sociology); Engineering; Artificial intelligence; Chemical engineering","score_opus":0.005220378398874406,"score_gpt":0.18227371951123575,"score_spread":0.17705334111236135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043751588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06272673,0.0010115794,0.9222582,0.0002491332,0.00025668778,0.00013619293,0.00007995954,0.0012619202,0.0120195905],"genre_scores_gemma":[0.94282,0.0003595705,0.052058276,0.00007326006,0.000059623995,0.00015307928,0.00008786295,0.000021474345,0.0043669557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998828,0.000021251284,0.000009617459,0.000028800077,0.00004797169,0.000009532066],"domain_scores_gemma":[0.99993944,0.00002120212,0.0000102898,0.0000032007756,0.000023112561,0.0000027612157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001926238,0.00046082286,0.0003771231,0.0001728525,0.0002797057,0.0004170511,0.0004224809,0.00042325445,0.0014182978],"category_scores_gemma":[0.00026013138,0.000109868284,0.00019721605,0.00014607456,0.000178177,0.00031373787,0.00016776948,0.00040450346,0.00015702323],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020128336,0.00010302032,0.00085935096,0.00029365032,0.0000960243,0.00020063041,0.00010550401,0.73896635,0.027079994,0.005923163,0.0024804764,0.2236905],"study_design_scores_gemma":[0.000015886386,0.000053337328,0.00023491446,0.000008177774,0.00001171821,0.000019073574,0.0000063001708,0.99617153,0.0020584527,0.00034569562,0.0010706164,0.000004260267],"about_ca_topic_score_codex":0.00572398,"about_ca_topic_score_gemma":0.0064020013,"teacher_disagreement_score":0.00572398,"about_ca_system_score_codex":0.00023625472,"about_ca_system_score_gemma":0.00029236428,"threshold_uncertainty_score":0.011381328},"labels":[],"label_agreement":null},{"id":"W3043776848","doi":"10.11575/prism/28483","title":"Towards Net-Zero Energy Supermarket: An Investigation of Passive and Active Design Strategies","year":2017,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Strong","keywords":"Zero (linguistics); Zero-energy building; Energy (signal processing); Net (polyhedron); Computer science; Environmental science; Mathematics; Statistics","score_opus":0.011107303098926522,"score_gpt":0.19051018634906067,"score_spread":0.17940288325013415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043776848","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46465746,0.0010073513,0.42275777,0.00042276378,0.000052265157,0.00031126154,0.0001022315,0.00032495763,0.11036391],"genre_scores_gemma":[0.89328957,0.0007998972,0.08164996,0.00006131489,0.0000067717683,0.00012335683,0.00006194566,0.00009259677,0.023914637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999811,0.000046198013,0.000004259121,0.000035034456,0.000081789476,0.00002174443],"domain_scores_gemma":[0.99988484,0.000038036127,0.000016959491,0.00001381345,0.00003724936,0.0000091137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004553988,0.00066000386,0.0002906387,0.00026846366,0.00027808503,0.0011595903,0.0008625502,0.00039685276,0.004492147],"category_scores_gemma":[0.0003924226,0.0002653259,0.00032462212,0.00018892891,0.00035756364,0.00093442644,0.00036989295,0.00033664968,0.00049615203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043731614,0.00063642475,0.0034833497,0.001401951,0.00008173644,0.00025512744,0.00095367397,0.5098048,0.15636753,0.0972159,0.0019765154,0.22738568],"study_design_scores_gemma":[0.0001633321,0.0025125472,0.0037258258,0.00022131499,0.00017584514,0.00025202997,0.0015452524,0.82742226,0.08905787,0.020288672,0.05457357,0.000061520346],"about_ca_topic_score_codex":0.0015015748,"about_ca_topic_score_gemma":0.0035870264,"teacher_disagreement_score":0.004492147,"about_ca_system_score_codex":0.00075980305,"about_ca_system_score_gemma":0.00051883433,"threshold_uncertainty_score":0.015027702},"labels":[],"label_agreement":null},{"id":"W3044455029","doi":"10.48550/arxiv.2007.13645","title":"PowerGAN: Synthesizing Appliance Power Signatures Using Generative Adversarial Networks","year":2020,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Adversarial system; Generative grammar; Computer science; Power (physics); Generative adversarial network; Artificial intelligence; Deep learning; Physics","score_opus":0.05014251085474193,"score_gpt":0.16588247383502588,"score_spread":0.11573996298028395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044455029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059457634,0.00025577834,0.9303237,0.0004860419,0.00008695153,0.00009278258,0.00039865257,0.002313583,0.0065848413],"genre_scores_gemma":[0.8543817,0.00019192717,0.13859843,0.00038037842,0.00004088552,0.00015779145,0.0010979911,0.00038527735,0.0047656964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970573,0.00012252819,0.000007774136,0.000067579625,0.00006814462,0.00002823647],"domain_scores_gemma":[0.9990909,0.00064410217,0.00005138265,0.00012423372,0.00006456357,0.000024859895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077177037,0.0008728486,0.00033261412,0.0002914195,0.00015825382,0.0004608835,0.0007224328,0.00057710055,0.0019162885],"category_scores_gemma":[0.0026960443,0.00030122916,0.00039148921,0.00023640072,0.00062260753,0.0007841315,0.00093064806,0.0011576511,0.0004995541],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004197295,0.000024401652,0.0006076071,0.000032565316,0.000021019074,0.00005206217,0.000025161073,0.9636511,0.0021844876,0.0064390153,0.0020323282,0.024888296],"study_design_scores_gemma":[0.0000037648538,0.000011380839,0.00007035743,0.0000033256545,0.0000017935051,0.000012662846,0.0000031572843,0.9946622,0.0011573768,0.003670278,0.0004012611,0.0000024125184],"about_ca_topic_score_codex":0.0015941482,"about_ca_topic_score_gemma":0.0027603095,"teacher_disagreement_score":0.0019162885,"about_ca_system_score_codex":0.0004970801,"about_ca_system_score_gemma":0.00039221728,"threshold_uncertainty_score":0.0064105988},"labels":[],"label_agreement":null},{"id":"W3046697705","doi":"10.1109/isie45063.2020.9152474","title":"Peak-to-Average Ratio Analysis of A Load Aggregator for Incentive-based Demand Response","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydrogenics (Canada); Université du Québec à Trois-Rivières","funders":"","keywords":"News aggregator; Demand response; Smart grid; Load management; Flexibility (engineering); Computer science; Incentive; Grid; Peak demand; Load shifting; Function (biology); Energy market; Operations research; Electricity; Engineering; Microeconomics; Economics","score_opus":0.01355217865614859,"score_gpt":0.21911541573445734,"score_spread":0.20556323707830876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3046697705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41907656,0.00019345216,0.5630438,0.00048260408,0.00004952578,0.00016725618,0.00012917386,0.000390393,0.016467243],"genre_scores_gemma":[0.99166274,0.000031676307,0.0070208334,0.00001528136,0.000005173689,0.00003189502,0.000020792206,0.000017447719,0.0011940432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962294,0.0001822228,0.00001205056,0.00004577942,0.0000753112,0.00006163133],"domain_scores_gemma":[0.99937516,0.00034029223,0.00008030487,0.00003620663,0.00013485033,0.00003320486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010250005,0.00043410962,0.00047075865,0.00027630012,0.000334032,0.0006854531,0.00061244017,0.00060777576,0.0028359634],"category_scores_gemma":[0.002049181,0.00020457184,0.00048722926,0.00018851754,0.00040275333,0.0005531576,0.0004061032,0.00056905893,0.00015494101],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010708098,0.000053534954,0.00067270105,0.000029169,0.000017361765,0.0000754912,0.000033570337,0.9846681,0.0031937456,0.007534994,0.00024295809,0.0033712946],"study_design_scores_gemma":[0.0000018782385,0.000017200078,0.00008384419,6.680773e-7,0.0000031513152,0.0000036105346,0.0000048728157,0.9992028,0.00030126955,0.00032792316,0.00005140139,0.0000013050962],"about_ca_topic_score_codex":0.005989555,"about_ca_topic_score_gemma":0.0027817343,"teacher_disagreement_score":0.005989555,"about_ca_system_score_codex":0.0008464972,"about_ca_system_score_gemma":0.0008014792,"threshold_uncertainty_score":0.011909366},"labels":[],"label_agreement":null},{"id":"W3047120619","doi":"10.14288/1.0392602","title":"Bike Theft Reduction at UBC","year":2020,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reduction (mathematics); Computer science; Computer security; Mathematics","score_opus":0.0075740253015494675,"score_gpt":0.13875253329193632,"score_spread":0.13117850799038686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047120619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4890756,0.0023288396,0.16166262,0.006322758,0.00084463984,0.005901363,0.004481624,0.008458586,0.32092395],"genre_scores_gemma":[0.7072545,0.0017962388,0.15950976,0.00073334563,0.00009885175,0.0019821646,0.004703492,0.0008645198,0.12305714],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99355173,0.0009546449,0.00018026512,0.0005069626,0.004007128,0.0007992945],"domain_scores_gemma":[0.99068856,0.00079590187,0.00031153733,0.00054870563,0.0069582555,0.00069697545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00526395,0.0008726352,0.00074725423,0.0053274427,0.0043063546,0.0061762026,0.0016371858,0.0012859532,0.020038052],"category_scores_gemma":[0.009903331,0.00036928288,0.0007679881,0.0035168051,0.0009093415,0.0026909895,0.0033001397,0.0020301687,0.0052911877],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005666025,0.0009126793,0.01672146,0.0017199437,0.00008767843,0.00059306883,0.0060695237,0.010988015,0.01913881,0.018026074,0.07258155,0.8525947],"study_design_scores_gemma":[0.00019780136,0.0033929334,0.11612131,0.003375161,0.0003101129,0.0008975327,0.050577577,0.067107685,0.07833758,0.017379047,0.6617535,0.0005498767],"about_ca_topic_score_codex":0.038758174,"about_ca_topic_score_gemma":0.07369313,"teacher_disagreement_score":0.96124184,"about_ca_system_score_codex":0.0058963154,"about_ca_system_score_gemma":0.0131339785,"threshold_uncertainty_score":0.07706511},"labels":[],"label_agreement":null},{"id":"W3047628545","doi":"10.1109/wf-iot48130.2020.9221240","title":"Demand Response for Residential Uses: A Data Analytics Approach","year":2020,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dynamic time warping; Smart grid; Demand response; Computer science; Analytics; Electricity; Mode (computer interface); Power consumption; Data analysis; Real-time computing; Database; Data mining; Power (physics); Human–computer interaction; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.11148067628272319,"score_gpt":0.28461550972136235,"score_spread":0.17313483343863917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047628545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.095942825,0.00080070854,0.86550134,0.0035613885,0.00020265172,0.0005536424,0.0158623,0.0058397744,0.011735373],"genre_scores_gemma":[0.63360107,0.0007136657,0.34619704,0.0004583889,0.00030398433,0.00033890174,0.014348379,0.00026097771,0.003777605],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883753,0.00023739935,0.00011558793,0.00032816397,0.00038043116,0.00010083124],"domain_scores_gemma":[0.99823916,0.00071375736,0.00017725276,0.0003817676,0.0004162853,0.00007179323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011166912,0.0011190914,0.00083260733,0.0034231206,0.00052465685,0.002141658,0.0012832669,0.0012293361,0.0023388837],"category_scores_gemma":[0.0032632046,0.00041883602,0.0008196645,0.0050926474,0.00037014057,0.002596002,0.00095947855,0.0014404457,0.0015391676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005443677,0.0016908196,0.059998553,0.0008183454,0.00043625277,0.0012450997,0.001696662,0.28136188,0.023965474,0.05035144,0.03444376,0.5434474],"study_design_scores_gemma":[0.000009263115,0.00005607709,0.0065234145,0.000032134074,0.000025871377,0.00015159481,0.0007079009,0.9586495,0.0039868103,0.017741108,0.012079722,0.000036576253],"about_ca_topic_score_codex":0.0063308715,"about_ca_topic_score_gemma":0.0057704034,"teacher_disagreement_score":0.0063308715,"about_ca_system_score_codex":0.0007313235,"about_ca_system_score_gemma":0.0007532,"threshold_uncertainty_score":0.012588084},"labels":[],"label_agreement":null},{"id":"W3048026270","doi":"10.1109/itec48692.2020.9161648","title":"Procurement of ILM in Deregulated Power Systems Using Computational Intelligence Tools","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Procurement; Artificial neural network; Electric power system; Fuzzy logic; Electricity; Energy management; Reliability engineering; Service (business); Software; Operations research; Power (physics); Artificial intelligence; Energy (signal processing); Engineering","score_opus":0.05181741268444844,"score_gpt":0.22669558363514564,"score_spread":0.1748781709506972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048026270","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05396133,0.0003481393,0.9209884,0.00022930314,0.000024337472,0.00010491577,0.000051613606,0.00058584043,0.023706201],"genre_scores_gemma":[0.91693646,0.00021095136,0.08046002,0.000031307492,0.000010513132,0.000060874856,0.000043612014,0.000027012022,0.002219316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996686,0.00011595482,0.000015265738,0.000045463377,0.00011886229,0.000035922123],"domain_scores_gemma":[0.99959606,0.00019643895,0.000081588834,0.00004560685,0.000065765744,0.000014464007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060984446,0.00039968206,0.00040760462,0.0004595295,0.0003227662,0.001139472,0.00047460923,0.00035087066,0.0017591589],"category_scores_gemma":[0.0012383731,0.0002502156,0.00023590717,0.00038311223,0.0003821287,0.0010073383,0.0004488745,0.00045247693,0.0002599541],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006243795,0.000067762696,0.0011811833,0.00010188094,0.000020722287,0.00016853906,0.00009807984,0.83001494,0.004487638,0.023533586,0.00061914633,0.13964409],"study_design_scores_gemma":[0.000004897404,0.00003812675,0.0002137425,0.000010143641,0.000004682696,0.000021748365,0.000025600579,0.9925809,0.0011335174,0.004730494,0.001231872,0.000004311825],"about_ca_topic_score_codex":0.001874951,"about_ca_topic_score_gemma":0.0032905121,"teacher_disagreement_score":0.001874951,"about_ca_system_score_codex":0.0008450965,"about_ca_system_score_gemma":0.00072414917,"threshold_uncertainty_score":0.0061315894},"labels":[],"label_agreement":null},{"id":"W3048668956","doi":"10.23977/jeis.2020.51005","title":"Research on Microgrid Power Direct Transaction Behavior Based on Blockchain","year":2020,"lang":"en","type":"article","venue":"Journal of Electronics and Information Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microgrid; Cluster analysis; Blockchain; Database transaction; Computer science; Electricity; Electricity market; Transaction data; Data mining; Database; Control (management); Engineering; Artificial intelligence; Computer security","score_opus":0.01784269261108904,"score_gpt":0.26927335663525986,"score_spread":0.2514306640241708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048668956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3262046,0.0011445339,0.6593032,0.00088278274,0.00008710465,0.00017279811,0.00021830441,0.00043160268,0.011555057],"genre_scores_gemma":[0.98577845,0.00048291576,0.011705146,0.000028937444,0.00002120722,0.000052983854,0.00007865683,0.000015329038,0.0018364401],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985649,0.0004043443,0.00008336671,0.0003802782,0.0004069346,0.00016024025],"domain_scores_gemma":[0.9968978,0.0015649247,0.0004024066,0.00037156662,0.0006185405,0.00014474305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014202549,0.00043741553,0.00081821694,0.00074584346,0.0007780311,0.0015420428,0.0012817504,0.00064152275,0.0024511165],"category_scores_gemma":[0.0057987976,0.0003612247,0.0005062912,0.0014456662,0.0011517676,0.003957343,0.00084749307,0.0007291694,0.0002525137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021903349,0.00013839983,0.011900011,0.00026573046,0.0001288919,0.0005790053,0.0006037491,0.7911805,0.0062518404,0.12391289,0.0013159487,0.06350402],"study_design_scores_gemma":[0.000008100311,0.000032340988,0.0004875886,0.0000074292175,0.000010762439,0.00006735717,0.000052803793,0.98466647,0.0007021051,0.013457663,0.00049825374,0.000009077536],"about_ca_topic_score_codex":0.0065499176,"about_ca_topic_score_gemma":0.0032196888,"teacher_disagreement_score":0.0065499176,"about_ca_system_score_codex":0.0011616412,"about_ca_system_score_gemma":0.0013564625,"threshold_uncertainty_score":0.013023615},"labels":[],"label_agreement":null},{"id":"W3049564442","doi":"10.1016/j.epsr.2020.106625","title":"Identification of hot water end-use process of electric water heaters from energy measurements","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"U.S. Department of Energy; National Science Foundation","keywords":"Unobservable; Markov chain; Markov process; Context (archaeology); Population; Process (computing); Demand response; Identification (biology); Engineering; Interval (graph theory); Mathematical optimization; Computer science; Mathematics; Electricity; Statistics; Econometrics","score_opus":0.05053343481197021,"score_gpt":0.27140683114291436,"score_spread":0.22087339633094416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3049564442","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9236675,0.0002608452,0.07195187,0.00006419135,0.000030890864,0.00006598937,0.0005182661,0.00059914147,0.0028411925],"genre_scores_gemma":[0.9968258,0.000047075126,0.0022633823,0.0000058877727,0.000005151751,0.00001093786,0.00010250049,0.000016795017,0.0007225445],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99986565,0.000013859077,0.0000053265744,0.000041325875,0.00005183263,0.000021953489],"domain_scores_gemma":[0.9998559,0.00006714801,0.000019388559,0.00001361234,0.00003669035,0.0000072252687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014668549,0.00040540932,0.00038282364,0.0005302469,0.00023019989,0.000406625,0.000395183,0.00054109126,0.0008420018],"category_scores_gemma":[0.0003587575,0.0002062808,0.0003136673,0.0002903565,0.00019428946,0.0005327536,0.00020643705,0.00038927863,0.00033070054],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018552578,0.00028979612,0.07025776,0.00032572617,0.00012681074,0.0007207259,0.00038431658,0.045557473,0.77909935,0.0010915346,0.0011284435,0.09916281],"study_design_scores_gemma":[0.000029902776,0.00019141572,0.110680364,0.000016229182,0.000049824772,0.00019022149,0.00016382377,0.49491668,0.39170727,0.00074804656,0.00126629,0.00003998534],"about_ca_topic_score_codex":0.0020568594,"about_ca_topic_score_gemma":0.0027892366,"teacher_disagreement_score":0.0020568594,"about_ca_system_score_codex":0.00020883072,"about_ca_system_score_gemma":0.00016579167,"threshold_uncertainty_score":0.004089713},"labels":[],"label_agreement":null},{"id":"W3080315628","doi":"10.1186/s42162-021-00137-9","title":"Investigating the performance gap between testing on real and denoised aggregates in non-intrusive load monitoring","year":2021,"lang":"en","type":"preprint","venue":"Energy Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Aggregate (composite); Computer science; Noise (video); CLARITY; Field (mathematics); Artificial neural network; Energy (signal processing); Machine learning; Data mining; Artificial intelligence; Algorithm; Mathematics; Statistics","score_opus":0.0232011901300245,"score_gpt":0.22172282024006248,"score_spread":0.19852163011003798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3080315628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9329993,0.000912889,0.060461868,0.00062884303,0.00020092081,0.00010175124,0.0005819412,0.0018080754,0.0023043628],"genre_scores_gemma":[0.9817213,0.000080326645,0.016636167,0.00010486696,0.000030575036,0.000034629735,0.0009977826,0.000065724285,0.00032876278],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99367297,0.0028377043,0.00065583875,0.0010768138,0.0013875616,0.0003690416],"domain_scores_gemma":[0.96759015,0.023086771,0.0017711225,0.0041610743,0.0027574524,0.0006334198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072458754,0.0008496872,0.00073616265,0.00087796926,0.0003617833,0.0014358124,0.0015182361,0.0012330943,0.0006391394],"category_scores_gemma":[0.034273606,0.00020674907,0.0003934321,0.0007442208,0.00089875335,0.001475794,0.0010968669,0.0009844867,0.0003591209],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043807854,0.0015754035,0.10502853,0.0012287978,0.00088113017,0.0006604032,0.0010775893,0.580599,0.047056057,0.0042459117,0.008360772,0.24490564],"study_design_scores_gemma":[0.00009693782,0.001000502,0.030517252,0.00009104121,0.000082866616,0.00031906244,0.00045082835,0.93111014,0.031526487,0.0026714706,0.0020779616,0.000055476023],"about_ca_topic_score_codex":0.0030636147,"about_ca_topic_score_gemma":0.0026307143,"teacher_disagreement_score":0.0072458754,"about_ca_system_score_codex":0.00056743843,"about_ca_system_score_gemma":0.00044355847,"threshold_uncertainty_score":0.038320243},"labels":[],"label_agreement":null},{"id":"W3081650381","doi":"10.1109/sege49949.2020.9181985","title":"Multi-advisor Deep Reinforcement Learning for Thermostatically Controlled Heating in Smart Homes","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Computer science; Weighting; Schedule; Energy consumption; Set point; Set (abstract data type); Reduction (mathematics); Control (management); Demand response; Artificial intelligence; Machine learning; Engineering; Control engineering; Electricity; Mathematics","score_opus":0.015798705470148115,"score_gpt":0.2236927800176281,"score_spread":0.20789407454748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081650381","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13302368,0.00037312327,0.8620299,0.00028784486,0.000058716632,0.000052736246,0.000038282553,0.0010215197,0.00311406],"genre_scores_gemma":[0.97602046,0.00003589181,0.022677273,0.000054740638,0.000010581084,0.000028570017,0.000021447886,0.000019507565,0.0011314563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997638,0.00008499064,0.000008737404,0.000052032923,0.000046651974,0.000043930882],"domain_scores_gemma":[0.99953806,0.00026722503,0.000054935666,0.000036274472,0.0000685641,0.000034979763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009523083,0.00054091,0.0005843716,0.00014067932,0.00019999917,0.0003958366,0.0007695078,0.0006335718,0.0012523535],"category_scores_gemma":[0.0015943274,0.00024829328,0.00019036123,0.0001488294,0.00047112582,0.0005649495,0.0006041405,0.000952748,0.00015094303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012304184,0.00008219383,0.00061549566,0.00003163033,0.00001899793,0.000035620575,0.000031265823,0.95900625,0.0020712684,0.0014506795,0.0004993349,0.0360343],"study_design_scores_gemma":[0.0000040070477,0.000015180934,0.000038328857,9.686169e-7,0.0000010037081,0.0000019427778,0.0000012291474,0.9992662,0.00026313248,0.00035935635,0.00004765075,0.0000010446491],"about_ca_topic_score_codex":0.0035482077,"about_ca_topic_score_gemma":0.0046619796,"teacher_disagreement_score":0.0035482077,"about_ca_system_score_codex":0.00051915616,"about_ca_system_score_gemma":0.0005830464,"threshold_uncertainty_score":0.007055104},"labels":[],"label_agreement":null},{"id":"W3082218290","doi":"10.1109/pmaps47429.2020.9183613","title":"Temperature Driven Bayesian Probabilistic Modelling of Electricity Demand, Capacity, and Adequacy","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Public Health","funders":"","keywords":"Probabilistic logic; Random variable; Computer science; Supply and demand; Duration (music); Electricity; Demand curve; Bayesian probability; Probability distribution; Capacity planning; Econometrics; Reliability engineering; Statistics; Engineering; Mathematics; Economics; Microeconomics","score_opus":0.01989818435379475,"score_gpt":0.17791718791622008,"score_spread":0.15801900356242532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082218290","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1176153,0.00012763604,0.8739582,0.0004744036,0.0000296277,0.00008752933,0.0007682243,0.00026372503,0.0066754],"genre_scores_gemma":[0.94197357,0.00021541637,0.051467426,0.00008472535,0.00003588455,0.00016233443,0.0006413019,0.00007694477,0.005342341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989507,0.00045918056,0.000041606727,0.00018165655,0.00023680304,0.00012996295],"domain_scores_gemma":[0.9967127,0.0023453815,0.00037435972,0.00015262539,0.00032554244,0.000089304696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002249208,0.00057050353,0.00089155225,0.00095587893,0.00040796146,0.0013513338,0.0017485064,0.0012293169,0.0029492318],"category_scores_gemma":[0.007883909,0.001108979,0.0009822302,0.0011439639,0.0009834043,0.0022383854,0.0007129768,0.0012970738,0.0003806859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034786506,0.000022244136,0.0012388948,0.000014063064,0.00001760695,0.000037823615,0.000046541852,0.97458714,0.000394687,0.020602822,0.00023410002,0.0027692372],"study_design_scores_gemma":[0.0000040432465,0.000006858956,0.00045572047,0.0000026726166,0.000003959874,0.000014948713,0.000008036908,0.9939476,0.00007205541,0.005341315,0.00013522543,0.000007555343],"about_ca_topic_score_codex":0.018425772,"about_ca_topic_score_gemma":0.02123397,"teacher_disagreement_score":0.018425772,"about_ca_system_score_codex":0.0016957087,"about_ca_system_score_gemma":0.0009386931,"threshold_uncertainty_score":0.03663701},"labels":[],"label_agreement":null},{"id":"W3082847660","doi":"10.1109/tpwrs.2020.3020856","title":"Integrating Net Benefits Test for Demand Response Into Optimal Power Flow Formulation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Implementation; Procurement; Computer science; Power flow; Demand response; Electric power system; Reliability engineering; Operations research; Payment; Economics; Mathematical optimization; Power (physics); Electrical engineering; Engineering; Electricity; Mathematics","score_opus":0.012887198309908567,"score_gpt":0.21277737668644545,"score_spread":0.1998901783765369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082847660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009426723,0.00011967213,0.97968733,0.00035605216,0.000093994095,0.00013892063,0.000067095294,0.00012054885,0.009989674],"genre_scores_gemma":[0.6689282,0.0003188877,0.3179443,0.0003105494,0.0001568086,0.000533035,0.00024815206,0.00023503853,0.011325099],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992867,0.00038143506,0.000018333538,0.0000625797,0.00016450202,0.000086477325],"domain_scores_gemma":[0.99895835,0.0006818415,0.000081892926,0.000034591023,0.00020334909,0.0000398981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002201135,0.0010231243,0.00089473027,0.00051630207,0.00030563117,0.0011461059,0.001005688,0.0011878393,0.0052030925],"category_scores_gemma":[0.004011604,0.0005303988,0.00067773944,0.0004414391,0.00082076504,0.0014162518,0.00067054696,0.0016585112,0.000353256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020716294,0.000022274737,0.00011860587,0.000029135943,0.000006400232,0.000042547596,0.000015639955,0.97783124,0.00023423773,0.015135631,0.0006531752,0.005890418],"study_design_scores_gemma":[0.000004074712,0.000012093542,0.00001678878,0.0000030612798,0.0000011764314,0.0000034198597,0.000005183511,0.9972932,0.00006264287,0.0022495347,0.00034733253,0.0000016224894],"about_ca_topic_score_codex":0.008430618,"about_ca_topic_score_gemma":0.007197511,"teacher_disagreement_score":0.008430618,"about_ca_system_score_codex":0.0011618653,"about_ca_system_score_gemma":0.002053178,"threshold_uncertainty_score":0.017406106},"labels":[],"label_agreement":null},{"id":"W3084675714","doi":"10.1016/j.apenergy.2020.115851","title":"Optimal residential users coordination via demand response: An exact distributed framework","year":2020,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Ministerio de Ciencia, Innovación y Universidades","keywords":"News aggregator; Bilevel optimization; Scalability; Demand response; Computer science; Exploit; Mathematical optimization; Profit (economics); Linear programming; Karush–Kuhn–Tucker conditions; Integer programming; Operations research; Distributed computing; Optimization problem; Engineering; Computer security; Database; Algorithm; Mathematics; Microeconomics; Economics","score_opus":0.008047011418084681,"score_gpt":0.20609860564006832,"score_spread":0.19805159422198365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084675714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012354608,0.00026622426,0.97922117,0.00056424487,0.0000840689,0.00006767281,0.00018310559,0.0002264721,0.007032324],"genre_scores_gemma":[0.9148394,0.0003323431,0.07610258,0.00022871645,0.00014373704,0.00014257467,0.00017817551,0.00014790962,0.0078846775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984743,0.00056250073,0.000051712395,0.0003296651,0.0002874214,0.00029437157],"domain_scores_gemma":[0.99734986,0.0017553739,0.00020539835,0.00022106498,0.00031779543,0.00015039596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025504127,0.0012866558,0.0032589966,0.00064322416,0.0007810136,0.002533847,0.0026925656,0.0022308624,0.0067497957],"category_scores_gemma":[0.0063033965,0.0012847399,0.000966671,0.0014862679,0.0016010527,0.0025987222,0.0022669598,0.0018357465,0.0006913959],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049258506,0.000020962794,0.00007055854,0.00002441698,0.000012480992,0.000026066336,0.000018029898,0.98602897,0.00013817512,0.010000271,0.00055758574,0.0030532712],"study_design_scores_gemma":[0.0000075155767,0.0000053460894,0.000016342769,0.0000016007631,0.0000033175827,0.0000043895284,0.000006163031,0.9953548,0.000033595446,0.0044688126,0.000095956384,0.0000021857418],"about_ca_topic_score_codex":0.0121551715,"about_ca_topic_score_gemma":0.011140063,"teacher_disagreement_score":0.0121551715,"about_ca_system_score_codex":0.002193168,"about_ca_system_score_gemma":0.002833113,"threshold_uncertainty_score":0.024168849},"labels":[],"label_agreement":null},{"id":"W3085049125","doi":"10.1016/j.est.2020.101853","title":"Techno-economic study driven based on available efficiency index for optimal operation of a smart grid in the presence of energy storage system","year":2020,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Energy storage; Smart grid; Renewable energy; Reliability engineering; Profit (economics); Electric power system; Tariff; Computer science; Environmental economics; Engineering; Power (physics); Electrical engineering; Economics; Microeconomics","score_opus":0.011936229891302705,"score_gpt":0.2036880429560495,"score_spread":0.1917518130647468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085049125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73420393,0.0013340175,0.22376049,0.0012986686,0.00016677151,0.00014665847,0.00038031806,0.000108505184,0.03860069],"genre_scores_gemma":[0.9971733,0.00012527252,0.0016052739,0.00001112174,0.000012761916,0.000014121399,0.00003937227,0.0000069138823,0.0010119277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996946,0.00012640153,0.000012656033,0.000032673895,0.00008557185,0.000048127007],"domain_scores_gemma":[0.9985221,0.0011075574,0.00007993014,0.00004415736,0.00020659057,0.000039737817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010328694,0.00040527174,0.00048184444,0.0007142369,0.00030452968,0.0012866332,0.00050933904,0.0006512468,0.0035276585],"category_scores_gemma":[0.0024843651,0.00019103818,0.0006811117,0.0005657123,0.00039258835,0.00093101297,0.00038647288,0.0005893849,0.00011313443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017381292,0.00010508179,0.005620733,0.00011146879,0.000071304385,0.00031639996,0.000044450488,0.9619867,0.0021021308,0.019532992,0.00077344873,0.009161394],"study_design_scores_gemma":[0.0000030188792,0.000027057691,0.0012053404,0.0000049709765,0.0000104346045,0.000022046284,0.000030445608,0.9970764,0.00024360308,0.0012594329,0.00011347875,0.000003768697],"about_ca_topic_score_codex":0.004477625,"about_ca_topic_score_gemma":0.004361748,"teacher_disagreement_score":0.004477625,"about_ca_system_score_codex":0.0007937665,"about_ca_system_score_gemma":0.0006149365,"threshold_uncertainty_score":0.011801243},"labels":[],"label_agreement":null},{"id":"W3085840227","doi":"10.3390/electronics9091517","title":"Characterizing the Effect of Conservation Voltage Reduction on the Hosting Capacity of Inverter-Based Distributed Energy Resources","year":2020,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"ATCO (Canada)","funders":"","keywords":"Distributed generation; Renewable energy; Grid; Subsidy; Environmental economics; AC power; Inverter; Electrical engineering; Mandate; Engineering; Voltage; Reliability engineering; Business; Economics; Political science","score_opus":0.010867488715412061,"score_gpt":0.17599289272138366,"score_spread":0.1651254040059716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085840227","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9637574,0.00070034195,0.008378001,0.0004316196,0.00006873082,0.000052796644,0.00079493865,0.00014386835,0.025672354],"genre_scores_gemma":[0.9983021,0.000117927375,0.00063097087,0.00003687231,0.000009584396,0.0000085309475,0.00019302618,0.000022439579,0.0006784333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992747,0.00015545705,0.000024027227,0.00012797906,0.00023560577,0.0001822693],"domain_scores_gemma":[0.99319565,0.0041882126,0.0006054757,0.0006270715,0.0011552934,0.00022825431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011916255,0.00035277376,0.00026127152,0.00050969014,0.00035594404,0.0011647153,0.0007798066,0.00049121334,0.0037075507],"category_scores_gemma":[0.0075674043,0.00014246159,0.00031757567,0.00074206013,0.0006447469,0.002636611,0.0004699102,0.0009037627,0.00062645297],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034067077,0.001242611,0.059091605,0.0005923347,0.00015720565,0.0005865059,0.0004609695,0.6681891,0.060242932,0.04777913,0.009660916,0.14858995],"study_design_scores_gemma":[0.00015742294,0.0035565812,0.09181749,0.00017380767,0.00028099344,0.0004936425,0.00164209,0.7485542,0.112418555,0.023372939,0.017356288,0.00017599488],"about_ca_topic_score_codex":0.0057016565,"about_ca_topic_score_gemma":0.0039919387,"teacher_disagreement_score":0.0057016565,"about_ca_system_score_codex":0.0011444346,"about_ca_system_score_gemma":0.00042498793,"threshold_uncertainty_score":0.012403011},"labels":[],"label_agreement":null},{"id":"W3086698630","doi":"10.1007/s00202-020-01078-4","title":"Non-intrusive load monitoring using multi-label classification methods","year":2020,"lang":"en","type":"article","venue":"Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Computer science; Classifier (UML); Field (mathematics); Machine learning; Power consumption; Artificial intelligence; Statistical classification; Data mining; Energy consumption; Power (physics); Engineering","score_opus":0.0559993872311573,"score_gpt":0.30041294136528257,"score_spread":0.24441355413412527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086698630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16451804,0.0012041426,0.8236705,0.00037424229,0.00062678684,0.00017463263,0.0006969857,0.0031037184,0.0056309905],"genre_scores_gemma":[0.87073755,0.00033018354,0.11946122,0.00021545572,0.00041376473,0.00012122761,0.0012561064,0.00015562875,0.007308852],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827313,0.00041328438,0.00011183912,0.00044680794,0.0005814016,0.00017349044],"domain_scores_gemma":[0.9973937,0.0010055493,0.000404764,0.00037845367,0.0007286652,0.00008894874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012860077,0.0012817029,0.0013603579,0.0015840861,0.00066458446,0.0015252838,0.0013614298,0.001095929,0.0015449271],"category_scores_gemma":[0.0024741832,0.00027487183,0.00067221315,0.0012760261,0.00033560712,0.0016921028,0.00084933586,0.0011976343,0.0015779057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001157048,0.00143259,0.0171711,0.000294989,0.00031655605,0.0002270042,0.0001900553,0.035495967,0.043016937,0.0013594655,0.0072890995,0.89204925],"study_design_scores_gemma":[0.00002128986,0.00016228252,0.0075254464,0.000026839549,0.000072170835,0.00012888452,0.000077582925,0.97628444,0.012415088,0.0015388563,0.0017138531,0.000033342272],"about_ca_topic_score_codex":0.0017810684,"about_ca_topic_score_gemma":0.0040241806,"teacher_disagreement_score":0.0017810684,"about_ca_system_score_codex":0.00035450648,"about_ca_system_score_gemma":0.00040343983,"threshold_uncertainty_score":0.006801188},"labels":[],"label_agreement":null},{"id":"W3087493083","doi":"10.3934/electreng.2020.3.326","title":"Implementation of non-intrusive appliances load monitoring (NIALM) on k-nearest neighbors (k-NN) classifier","year":2020,"lang":"en","type":"article","venue":"AIMS Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"Kungliga Tekniska Högskolan; Swedish Foundation for International Cooperation in Research and Higher Education; Styrelsen för Internationellt Utvecklingssamarbete","keywords":"Classifier (UML); Computer science; k-nearest neighbors algorithm; Benchmark (surveying); Power consumption; Voltage; Artificial intelligence; Pattern recognition (psychology); Data mining; Machine learning; Power (physics); Engineering","score_opus":0.006981905099905404,"score_gpt":0.21410069520915778,"score_spread":0.20711879010925238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087493083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25319898,0.0011999196,0.71712047,0.0004145384,0.00056328985,0.0006980139,0.0013567273,0.013225053,0.012222984],"genre_scores_gemma":[0.7350111,0.00037288436,0.25306344,0.00017630584,0.00008626493,0.00032456903,0.0022497084,0.000119189535,0.008596592],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895287,0.000108237124,0.000101132,0.00031747043,0.00040714958,0.000113122136],"domain_scores_gemma":[0.9991849,0.00014717685,0.000078586825,0.00012419482,0.00043344343,0.00003167558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068941346,0.00064924016,0.0010715205,0.00089241826,0.00050152,0.0007981798,0.0015226332,0.00077103236,0.0017060166],"category_scores_gemma":[0.0017208593,0.00021918214,0.0004475146,0.00074918615,0.00015582537,0.0009732989,0.0004894527,0.00059798564,0.0011887074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005098078,0.00064176525,0.020883333,0.0003263798,0.0001864979,0.00037289955,0.00017650984,0.034351792,0.027423862,0.0014281662,0.008886051,0.9048129],"study_design_scores_gemma":[0.000040948886,0.00044893532,0.014568654,0.000043932203,0.000058081667,0.00036160208,0.00018750924,0.9321806,0.0414552,0.0012044946,0.009396287,0.000053830816],"about_ca_topic_score_codex":0.0064552487,"about_ca_topic_score_gemma":0.009315741,"teacher_disagreement_score":0.0064552487,"about_ca_system_score_codex":0.00045527748,"about_ca_system_score_gemma":0.00070295314,"threshold_uncertainty_score":0.012835324},"labels":[],"label_agreement":null},{"id":"W3091196590","doi":"10.1109/ijcnn48605.2020.9207081","title":"Reinforcement Mechanism Design for Electric Vehicle Demand Response in Microgrid Charging Stations","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Reinforcement learning; Dynamic pricing; Markov decision process; Revenue; Computer science; Demand response; Revenue management; Electricity pricing; Mechanism design; Electricity; Q-learning; Lagrangian relaxation; Microgrid; Charging station; Operations research; Markov process; Scheduling (production processes); Electric vehicle; Electricity market; Microeconomics; Mathematical optimization; Business; Economics; Control (management); Engineering; Power (physics)","score_opus":0.021802321027688826,"score_gpt":0.2156612384326627,"score_spread":0.19385891740497385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3091196590","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0299669,0.00021429129,0.9661143,0.00023987977,0.000054014836,0.000103955,0.000028127537,0.0002478548,0.0030306892],"genre_scores_gemma":[0.9701512,0.00011900047,0.02771916,0.00007388301,0.000018797857,0.00014872663,0.000019453435,0.000017874114,0.001731853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991665,0.0003373167,0.0000382349,0.00016160327,0.00016035163,0.00013602078],"domain_scores_gemma":[0.998061,0.0010417538,0.00032637012,0.00008656182,0.00035229104,0.00013199581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020464591,0.000673196,0.00093243254,0.00041110363,0.00034113272,0.00078039727,0.0016101359,0.00096147764,0.0028611694],"category_scores_gemma":[0.004254175,0.0004358802,0.000562932,0.0003153554,0.00086847116,0.00069395953,0.0009424548,0.0012136428,0.00023881023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008109057,0.00007676586,0.0005042991,0.000060211638,0.000035856392,0.00007375696,0.00005045964,0.96780896,0.0017511955,0.011544458,0.0003472445,0.017665671],"study_design_scores_gemma":[0.0000140779475,0.00003422284,0.000037967417,0.0000024788508,0.0000050447316,0.000007805784,0.000003979997,0.99779886,0.00014448188,0.0017855319,0.00016274059,0.0000027673761],"about_ca_topic_score_codex":0.0032163083,"about_ca_topic_score_gemma":0.0020173362,"teacher_disagreement_score":0.0032163083,"about_ca_system_score_codex":0.0009448769,"about_ca_system_score_gemma":0.0014611008,"threshold_uncertainty_score":0.010822892},"labels":[],"label_agreement":null},{"id":"W3093502878","doi":"10.1016/j.ijepes.2020.106561","title":"Optimal planning and investment benefit analysis of shared energy storage for electricity retailers","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada School of Energy and Environment","keywords":"Energy storage; Investment (military); Electricity; Environmental economics; Investment analysis; Business; Electricity market; Energy (signal processing); Electricity retailing; Computer science; Operations research; Industrial organization; Economics; Electrical engineering; Finance; Engineering; Power (physics); Financial risk; Mathematics","score_opus":0.01415395892548893,"score_gpt":0.22631338260575268,"score_spread":0.21215942368026375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3093502878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6789169,0.001714334,0.25568232,0.002803896,0.00016900743,0.0004962343,0.0018027286,0.00039357546,0.058021106],"genre_scores_gemma":[0.991747,0.00012367313,0.004827183,0.000027604841,0.000011024675,0.00003730983,0.000100217,0.00002413657,0.0031019086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999448,0.0002564755,0.000016336244,0.000069800655,0.00008046688,0.00012897282],"domain_scores_gemma":[0.9981876,0.00137976,0.00009416147,0.000057061894,0.00017279698,0.00010860713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012857757,0.00080438284,0.0016828384,0.00070093153,0.00051404396,0.0021269287,0.0010674639,0.0013628269,0.0072683836],"category_scores_gemma":[0.003459805,0.0014030007,0.00081395975,0.0010007576,0.00096736057,0.0019783322,0.0009704993,0.0013379608,0.00024107298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009812387,0.00002486249,0.00022271858,0.000023160625,0.000013620311,0.000040982908,0.000012160014,0.99391574,0.00014506583,0.0035361755,0.0003017342,0.0016656703],"study_design_scores_gemma":[0.0000145840895,0.000030102214,0.00017756269,0.0000044677454,0.000012428905,0.000005392528,0.000035427867,0.9964689,0.00011873206,0.002997268,0.0001306789,0.0000044919693],"about_ca_topic_score_codex":0.026551703,"about_ca_topic_score_gemma":0.02904631,"teacher_disagreement_score":0.026551703,"about_ca_system_score_codex":0.003247252,"about_ca_system_score_gemma":0.003146196,"threshold_uncertainty_score":0.052794278},"labels":[],"label_agreement":null},{"id":"W3095159772","doi":"10.1016/j.est.2020.102022","title":"The role of energy storage and demand response as energy democracy policies in the energy productivity of hybrid hub system considering social inconvenience cost","year":2020,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Efficient energy use; Energy accounting; Energy management; Computer science; Energy (signal processing); Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.009318020520136337,"score_gpt":0.2061307808582054,"score_spread":0.19681276033806908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3095159772","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8864694,0.0010405451,0.07979711,0.0045621344,0.00021368197,0.000107869455,0.00034151168,0.00012708505,0.027340678],"genre_scores_gemma":[0.99846774,0.00007006724,0.0004347724,0.000017407896,0.000012280815,0.0000054833604,0.000009158115,0.0000055149476,0.0009775888],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993542,0.00032675717,0.000019579009,0.000072905554,0.000075629105,0.00015093235],"domain_scores_gemma":[0.9970276,0.002033151,0.00024774662,0.00010036347,0.00040449158,0.00018680577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020867863,0.0004511745,0.0007666364,0.000504536,0.0005681181,0.002529998,0.00089948456,0.0011075321,0.005561857],"category_scores_gemma":[0.004843102,0.0003448167,0.0004796537,0.0004888931,0.00085314893,0.003186816,0.0010052286,0.001077652,0.00015499079],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069436914,0.00022959047,0.008946245,0.00019081336,0.00013524617,0.00040987006,0.00013319775,0.87257737,0.0029481277,0.09390555,0.0016469922,0.018182604],"study_design_scores_gemma":[0.000038770806,0.00014658697,0.0038701955,0.000026200038,0.00008936215,0.00003990676,0.0005867204,0.96792877,0.0011235119,0.025092471,0.0010319807,0.000025493871],"about_ca_topic_score_codex":0.004743567,"about_ca_topic_score_gemma":0.0056539136,"teacher_disagreement_score":0.005561857,"about_ca_system_score_codex":0.001901872,"about_ca_system_score_gemma":0.00192638,"threshold_uncertainty_score":0.018606246},"labels":[],"label_agreement":null},{"id":"W3096591327","doi":"10.3390/en13215782","title":"Power Loss-Aware Transactive Microgrid Coalitions under Uncertainty","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transactive memory; Microgrid; Enabling; Computer science; Game theory; Electricity; Environmental economics; Electric power system; Risk analysis (engineering); Distributed computing; Operations research; Power (physics); Reliability engineering; Business; Microeconomics; Economics; Engineering; Artificial intelligence; Knowledge management; Electrical engineering; Control (management)","score_opus":0.009985587206303426,"score_gpt":0.19365295916609052,"score_spread":0.18366737195978708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096591327","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07515326,0.00024409199,0.919787,0.00027587856,0.000032848217,0.00008372334,0.000057148667,0.0002521436,0.0041139494],"genre_scores_gemma":[0.9654707,0.0000979478,0.03210319,0.00006333594,0.000015481475,0.00004991033,0.000048719714,0.000031635478,0.0021189214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991991,0.0002656487,0.000035630997,0.00015050046,0.00020122984,0.00014802226],"domain_scores_gemma":[0.99820125,0.00093176786,0.0002465767,0.00012509302,0.00029076316,0.00020459539],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018281214,0.0007961528,0.0014212346,0.00039223972,0.00070623157,0.001252081,0.0021288423,0.0008780847,0.0016341202],"category_scores_gemma":[0.003665592,0.00039520353,0.0005152917,0.00055735843,0.00082080887,0.0019683018,0.0023339374,0.0010530972,0.00025179127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016135644,0.00005899486,0.00091421755,0.000040773997,0.00004628895,0.00012315947,0.00011302373,0.9630497,0.0012117856,0.008603249,0.00060630636,0.025071114],"study_design_scores_gemma":[0.000007651345,0.000021691829,0.000074944975,0.000002205469,0.00000562797,0.000023139795,0.000024323903,0.9960892,0.00022380926,0.0033356787,0.00018879242,0.00000289465],"about_ca_topic_score_codex":0.004426518,"about_ca_topic_score_gemma":0.0038475173,"teacher_disagreement_score":0.004426518,"about_ca_system_score_codex":0.0009963134,"about_ca_system_score_gemma":0.0012066133,"threshold_uncertainty_score":0.009668112},"labels":[],"label_agreement":null},{"id":"W3097774950","doi":"10.11591/ijeecs.v17.i2.pp1005-1013","title":"Robust operation of microgrid energy system under uncertainties and demand response program","year":2020,"lang":"en","type":"article","venue":"Indonesian Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Microgrid; Demand response; Robust optimization; Mathematical optimization; Robustness (evolution); Renewable energy; Computer science; Linear programming; Photovoltaic system; Electric power system; Scheduling (production processes); Integer programming; Stochastic programming; Reliability engineering; Control theory (sociology); Electricity; Power (physics); Engineering; Mathematics","score_opus":0.008859732064040433,"score_gpt":0.17849053134282736,"score_spread":0.16963079927878694,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097774950","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5759346,0.00053762895,0.4039803,0.00048571886,0.000050473423,0.00012305622,0.0005098603,0.0012696409,0.017108727],"genre_scores_gemma":[0.9975981,0.000040445757,0.0018781188,0.0000071379295,0.0000032508922,0.000018071289,0.000036141075,0.000009659442,0.0004091011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996654,0.00013051253,0.000019018522,0.000067748544,0.000057731395,0.00005966109],"domain_scores_gemma":[0.9996319,0.00016196836,0.00010059972,0.00003480249,0.000052306044,0.000018407538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006877014,0.0007137865,0.0007224638,0.00024323125,0.00044940988,0.00096925,0.0005000686,0.0004943188,0.001327368],"category_scores_gemma":[0.0010515283,0.0002882693,0.0004786895,0.00027069537,0.00038212104,0.00063493615,0.00064104487,0.00047405262,0.00017029942],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000664891,0.000013626,0.00049182697,0.000034139655,0.00002375918,0.00011162482,0.000022713932,0.99198663,0.0016929246,0.0012508578,0.00017940144,0.004126038],"study_design_scores_gemma":[0.0000057038046,0.00004141571,0.00026776802,0.0000025302802,0.000007437149,0.000015094067,0.000015151713,0.99837816,0.00058388524,0.0005816435,0.00009733661,0.0000038657527],"about_ca_topic_score_codex":0.0069382796,"about_ca_topic_score_gemma":0.0030034417,"teacher_disagreement_score":0.0069382796,"about_ca_system_score_codex":0.00060667854,"about_ca_system_score_gemma":0.0005863858,"threshold_uncertainty_score":0.013795793},"labels":[],"label_agreement":null},{"id":"W3099459877","doi":"10.1002/9781119508311.ch31","title":"Research with Disaggregated Electricity End‐Use Data in Households","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Sketch; Electricity; Electricity system; Order (exchange); Energy (signal processing); Set (abstract data type); Environmental economics; Key (lock); Data science; Computer science; Business; Economics; Electricity generation; Engineering; Power (physics); Computer security; Electrical engineering; Finance","score_opus":0.07060228839387347,"score_gpt":0.2805670142566099,"score_spread":0.20996472586273643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099459877","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6535525,0.030923048,0.08634991,0.017371537,0.00077396684,0.00043825488,0.01753844,0.00019404176,0.19285837],"genre_scores_gemma":[0.923539,0.027161634,0.030949343,0.0016722562,0.0002352575,0.00034637775,0.0056673433,0.00009202383,0.010336863],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9931305,0.003905929,0.0004500396,0.0006796011,0.001604134,0.00022981741],"domain_scores_gemma":[0.9578188,0.030431086,0.004073989,0.003531323,0.003917753,0.00022705006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066758017,0.00019607756,0.00047561465,0.0033591413,0.00068061694,0.0046734195,0.0006647298,0.00064883934,0.004105472],"category_scores_gemma":[0.02927324,0.00034822244,0.0003514026,0.01991116,0.0012046908,0.007840028,0.0019387106,0.0010716072,0.0005867377],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014328017,0.00021063813,0.25336957,0.004338891,0.00056495675,0.00073975674,0.06102693,0.010714849,0.0025639439,0.28751245,0.023832899,0.35498172],"study_design_scores_gemma":[0.000016476304,0.00020859437,0.3017906,0.0072558066,0.00026448283,0.0007101579,0.1285542,0.009048873,0.005323747,0.07245922,0.47425097,0.000116872325],"about_ca_topic_score_codex":0.0134541225,"about_ca_topic_score_gemma":0.020238753,"teacher_disagreement_score":0.0134541225,"about_ca_system_score_codex":0.0017924766,"about_ca_system_score_gemma":0.0019856628,"threshold_uncertainty_score":0.03530538},"labels":[],"label_agreement":null},{"id":"W3099654264","doi":"","title":"1Distributed Real-Time Power Balancing in Renewable-Integrated Power Grids with Storage and Flexible Loads","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed power; Distributed generation; Renewable energy; Computer science; Power (physics); Electric power system; Distributed data store; Energy storage; Load balancing (electrical power); Distributed computing; Electrical engineering; Grid; Engineering; Voltage; Mathematics; Physics","score_opus":0.0032594977298024148,"score_gpt":0.17325632255294818,"score_spread":0.16999682482314576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099654264","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045664147,0.00022973241,0.94874513,0.0002294132,0.000058124184,0.000045423792,0.0000451937,0.00036481454,0.0046179197],"genre_scores_gemma":[0.9402612,0.00007709852,0.0574872,0.00004969379,0.00002758187,0.000047873753,0.000051152412,0.000028857019,0.001969287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996916,0.00011496911,0.0000135457085,0.00007307673,0.00006645201,0.000040347448],"domain_scores_gemma":[0.99947816,0.0002600821,0.00008195742,0.00006182601,0.00008557267,0.00003246207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007421754,0.00052579405,0.0007488221,0.00020343123,0.00036678603,0.000722375,0.0007713833,0.00056775194,0.002457155],"category_scores_gemma":[0.0012092441,0.0002081173,0.00028373374,0.00055642315,0.00055027875,0.00067961746,0.0006509347,0.00052750955,0.00034083964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006748536,0.000026540367,0.00025526533,0.000019536896,0.0000124409635,0.000031262833,0.000010780607,0.9824028,0.0010292286,0.0028120321,0.0003442019,0.012988446],"study_design_scores_gemma":[0.000011782481,0.000011916833,0.000039712744,0.0000014161682,0.0000016005408,0.000005883669,0.0000023533273,0.99843556,0.00019777186,0.0011757776,0.00011481185,0.0000014068262],"about_ca_topic_score_codex":0.0030333905,"about_ca_topic_score_gemma":0.0031327351,"teacher_disagreement_score":0.0030333905,"about_ca_system_score_codex":0.00071207876,"about_ca_system_score_gemma":0.00066419976,"threshold_uncertainty_score":0.008219957},"labels":[],"label_agreement":null},{"id":"W3099701611","doi":"10.1109/ojcoms.2020.3038590","title":"Fast Big Data Analytics for Smart Meter Data","year":2020,"lang":"en","type":"article","venue":"IEEE Open Journal of the Communications Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Cluster analysis; Computer science; Reduction (mathematics); Metric (unit); Dimensionality reduction; Big data; Dimension (graph theory); Computational complexity theory; Projection (relational algebra); Cluster (spacecraft); Data mining; Algorithm; Artificial intelligence; Mathematics; Engineering","score_opus":0.4113885549947741,"score_gpt":0.3471047353393338,"score_spread":0.06428381965544033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099701611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007832851,0.00042612292,0.9877274,0.0004217907,0.00015817846,0.00007584486,0.0005482883,0.0017018133,0.0011075716],"genre_scores_gemma":[0.25895903,0.00092517526,0.7327893,0.00022325214,0.00022697101,0.0003360408,0.0035226198,0.00019175516,0.0028259382],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992994,0.0001690437,0.000040806648,0.000122994,0.0003023946,0.00006539317],"domain_scores_gemma":[0.99839395,0.0006823382,0.00015513647,0.00027895207,0.00040132756,0.00008838145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095308165,0.001116219,0.0010487125,0.0016485873,0.00068994384,0.001767713,0.0010215839,0.0006421675,0.0017819165],"category_scores_gemma":[0.003606321,0.00055007736,0.00057029555,0.0028193963,0.0005092412,0.0022690974,0.0018665788,0.001977763,0.0012229431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041746857,0.00020405877,0.0033946317,0.00028300754,0.00016063688,0.00024676046,0.00017615258,0.37389138,0.013306574,0.035872944,0.027411066,0.54463524],"study_design_scores_gemma":[0.0000069291395,0.000017844388,0.00026708,0.0000052673213,0.000002815954,0.000024186711,0.000025460477,0.9856607,0.001666759,0.010142446,0.002173627,0.0000070034544],"about_ca_topic_score_codex":0.002630509,"about_ca_topic_score_gemma":0.0036125223,"teacher_disagreement_score":0.002630509,"about_ca_system_score_codex":0.0005471958,"about_ca_system_score_gemma":0.0013255886,"threshold_uncertainty_score":0.0059610605},"labels":[],"label_agreement":null},{"id":"W3101018449","doi":"10.1109/iecon43393.2020.9254932","title":"Deployment of Multiple Demand Response Programs Using Data-Driven Multi-Step Method with Elasticity","year":2020,"lang":"en","type":"article","venue":"IECON 2020 The 46th Annual Conference of the IEEE Industrial Electronics Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; École de Technologie Supérieure","funders":"","keywords":"Software deployment; Relocation; Computer science; Cluster analysis; Visibility; Elasticity (physics); Process (computing); MATLAB; Selection (genetic algorithm); Pricing strategies; Operations research; Mathematical optimization; Artificial intelligence; Business; Marketing; Engineering","score_opus":0.10877856879075151,"score_gpt":0.2783220001230719,"score_spread":0.1695434313323204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101018449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051169723,0.000060200375,0.9438507,0.0001185458,0.000044985216,0.00021709608,0.0001331525,0.0010300935,0.003375597],"genre_scores_gemma":[0.75122094,0.000040658797,0.24570109,0.000058776648,0.000009560843,0.0003925471,0.0001982286,0.00008917565,0.0022889243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965787,0.000115561124,0.000021785889,0.00007860461,0.00008189253,0.000044263783],"domain_scores_gemma":[0.9992842,0.00038357705,0.00007580527,0.000048867212,0.00016454727,0.000043065815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086130924,0.00070136186,0.0007486302,0.0005503532,0.00045300578,0.00067818956,0.0009146568,0.00086908543,0.0029974806],"category_scores_gemma":[0.0012845234,0.0004573772,0.000762695,0.0005228641,0.0002607862,0.00049087004,0.0007362131,0.00081142044,0.0004102601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012413868,0.00013008666,0.001229198,0.00008683889,0.00004031438,0.00007759403,0.00007330016,0.9629082,0.0029127346,0.0013851112,0.00044817766,0.030584324],"study_design_scores_gemma":[0.000004587822,0.00002090848,0.000084352665,0.000001937043,0.000002580837,0.0000040384534,0.000009692359,0.9990988,0.00042594573,0.00017068788,0.00017269726,0.000003831364],"about_ca_topic_score_codex":0.007910334,"about_ca_topic_score_gemma":0.0066479775,"teacher_disagreement_score":0.007910334,"about_ca_system_score_codex":0.0005587171,"about_ca_system_score_gemma":0.00088706636,"threshold_uncertainty_score":0.015728593},"labels":[],"label_agreement":null},{"id":"W3105897984","doi":"10.1002/9781119508311.ch27","title":"Who Gains from Hourly Time‐of‐Use Retail Prices on Electricity? An Analysis of Consumption Profiles for Categories of Danish Electricity Customers","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Consumption (sociology); Flexibility (engineering); Electricity; Incentive; Dynamic pricing; Electricity pricing; Load profile; Environmental economics; Electricity market; Economics; Business; Econometrics; Agricultural economics; Microeconomics; Engineering","score_opus":0.019422434858602042,"score_gpt":0.2354724152528687,"score_spread":0.21604998039426665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105897984","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9854726,0.0002726164,0.00031193026,0.0005213271,0.000009138704,0.0000076979895,0.0004768263,0.000008274877,0.012919617],"genre_scores_gemma":[0.9979919,0.00014696819,0.00007605161,0.00004482619,0.0000035712742,0.000001955962,0.00021700407,0.0000048239685,0.0015129143],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995185,0.00014435017,0.00001751462,0.00005468469,0.00014302864,0.000121978424],"domain_scores_gemma":[0.9989893,0.00052895956,0.00015123464,0.000064932654,0.00014396326,0.0001215929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048043273,0.00007852021,0.00019959397,0.00041023604,0.0002802278,0.0015170894,0.0002205744,0.0003650267,0.004277987],"category_scores_gemma":[0.0025906332,0.0001238581,0.00032560746,0.0009592619,0.00023581319,0.00079935614,0.00030937692,0.00038703516,0.0008996761],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012446312,0.0002561881,0.8507184,0.00007288941,0.00013512553,0.0008551535,0.0035428612,0.0038660658,0.0017209754,0.009106677,0.0057399916,0.12274108],"study_design_scores_gemma":[0.000013854292,0.00014282213,0.95747095,0.00005158974,0.000053874734,0.0007251146,0.01345962,0.00976888,0.00080145645,0.0031714698,0.014291514,0.00004876511],"about_ca_topic_score_codex":0.010322441,"about_ca_topic_score_gemma":0.013084528,"teacher_disagreement_score":0.010322441,"about_ca_system_score_codex":0.00076034816,"about_ca_system_score_gemma":0.0003405587,"threshold_uncertainty_score":0.02052474},"labels":[],"label_agreement":null},{"id":"W3106066138","doi":"10.1109/tsg.2020.3037066","title":"Deep Reinforcement Learning for Demand Response in Distribution Networks","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":129,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Reinforcement learning; Computer science; Scalability; Scheduling (production processes); Load management; Electricity; Mathematical optimization; Artificial intelligence; Engineering","score_opus":0.012348596394632233,"score_gpt":0.2089434403846324,"score_spread":0.19659484399000016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106066138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04662343,0.00031681018,0.9486595,0.00056247035,0.000044021475,0.00003414408,0.000057132278,0.00049125083,0.0032112172],"genre_scores_gemma":[0.97004235,0.000111182584,0.027154358,0.00009891217,0.000018371959,0.00006302163,0.000065926484,0.00003544754,0.0024104293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961793,0.00015789055,0.0000134494985,0.00007095534,0.00006694049,0.000072781324],"domain_scores_gemma":[0.9988349,0.00080363674,0.0001035929,0.000049353093,0.00015585539,0.000052704807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010624303,0.00065166806,0.0007314717,0.00023507306,0.00030288906,0.0005488717,0.00079022546,0.0007288665,0.0017440536],"category_scores_gemma":[0.0034821848,0.0003765038,0.00026466523,0.00029392212,0.0007291232,0.00073890726,0.0006827742,0.0015888314,0.00019333001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028441049,0.000023582552,0.000271545,0.000014878549,0.000008504183,0.000016871603,0.000014319537,0.9862774,0.00027973464,0.0034311463,0.00037062017,0.009262924],"study_design_scores_gemma":[0.0000021792957,0.0000030124024,0.00001485127,7.114686e-7,5.5534395e-7,7.872326e-7,9.38263e-7,0.9988589,0.000050536248,0.0010271308,0.000039758273,5.565337e-7],"about_ca_topic_score_codex":0.010047283,"about_ca_topic_score_gemma":0.009981765,"teacher_disagreement_score":0.010047283,"about_ca_system_score_codex":0.0014957372,"about_ca_system_score_gemma":0.0011736891,"threshold_uncertainty_score":0.01997763},"labels":[],"label_agreement":null},{"id":"W3106667537","doi":"10.1145/3427771.3429387","title":"Solar Disaggregation","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaics; Computer science; Solar power; Solar energy; Photovoltaic system; Data science; Power (physics); Engineering; Electrical engineering","score_opus":0.010286874139919848,"score_gpt":0.15823423644618717,"score_spread":0.14794736230626732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106667537","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15566763,0.0020293545,0.16157737,0.0016218787,0.001210932,0.0005876061,0.540682,0.010582808,0.1260404],"genre_scores_gemma":[0.6303872,0.0010196753,0.062128674,0.0006773445,0.00029253875,0.00039681117,0.2878686,0.0010391765,0.016190054],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992466,0.00012212273,0.00007968571,0.0002177671,0.00025917243,0.000074644646],"domain_scores_gemma":[0.998552,0.00022648662,0.00015242762,0.0005841348,0.00043619776,0.000048709455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006342736,0.0006861871,0.0009158236,0.0013532522,0.00047060655,0.0017345804,0.0006948509,0.00064203714,0.013271902],"category_scores_gemma":[0.0030470442,0.000259447,0.00086487306,0.0041987696,0.00017545023,0.0014769075,0.0009379922,0.0008649255,0.0063707987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065547053,0.0002350145,0.11752735,0.0017623777,0.0007900033,0.00028924027,0.0005810679,0.19202901,0.010101464,0.023620272,0.32299304,0.3294157],"study_design_scores_gemma":[0.00010872489,0.00011213255,0.12373436,0.0003090872,0.00020289292,0.00035663057,0.0006732992,0.22806142,0.016268417,0.028648106,0.6013598,0.00016514468],"about_ca_topic_score_codex":0.00889568,"about_ca_topic_score_gemma":0.0139138885,"teacher_disagreement_score":0.013271902,"about_ca_system_score_codex":0.00053746515,"about_ca_system_score_gemma":0.0005202618,"threshold_uncertainty_score":0.044398904},"labels":[],"label_agreement":null},{"id":"W3107377586","doi":"10.1109/ccece47787.2020.9255733","title":"Battery Storage System Optimization for Multiple Revenue Streams and Savings","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Revenue; Computer science; Profit maximization; Electricity; Software deployment; Profit (economics); Minification; Maximization; Scheduling (production processes); Demand response; Energy storage; Operations research; Arbitrage; Environmental economics; Mathematical optimization; Business; Operations management; Microeconomics; Economics; Engineering; Electrical engineering; Finance","score_opus":0.009669010136917745,"score_gpt":0.16294177207843746,"score_spread":0.15327276194151973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3107377586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41511613,0.0025895906,0.4698441,0.002834041,0.00014977907,0.0004698998,0.0020366183,0.00080317695,0.106156535],"genre_scores_gemma":[0.96490586,0.0003154834,0.017726034,0.00006831767,0.000020630414,0.0000652635,0.0002258487,0.000046195415,0.016626347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999816,0.000043834036,0.0000050048175,0.000026921689,0.000048640584,0.000059689828],"domain_scores_gemma":[0.9998324,0.000067750945,0.000017297898,0.0000075946846,0.000059406917,0.00001555197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040708308,0.0007088029,0.0006977497,0.0002959275,0.0003977343,0.0011368212,0.00080681755,0.0006533493,0.006628598],"category_scores_gemma":[0.00085883273,0.00032026897,0.0003552506,0.00075673964,0.0003378401,0.00060911395,0.0004812431,0.0005067825,0.0003137214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067643174,0.000026885997,0.0003986208,0.000040710438,0.000015006427,0.000089670946,0.000022243874,0.97784346,0.00080369983,0.0066175293,0.0024539318,0.011620541],"study_design_scores_gemma":[0.000013675066,0.00001947348,0.00028591356,0.0000041355556,0.0000073164206,0.00001377621,0.000022662633,0.9968375,0.00020701291,0.0016607507,0.0009241544,0.000003659709],"about_ca_topic_score_codex":0.08263699,"about_ca_topic_score_gemma":0.12442651,"teacher_disagreement_score":0.08263699,"about_ca_system_score_codex":0.003526693,"about_ca_system_score_gemma":0.0032056482,"threshold_uncertainty_score":0.16431195},"labels":[],"label_agreement":null},{"id":"W3108203829","doi":"10.1109/epe51172.2020.9269163","title":"Intelligent Scheduling of Heat Pump to Minimize the Cost of Electricity","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Heat pump; Particle swarm optimization; Energy conservation; Computer science; Electricity; Scheduling (production processes); Metaheuristic; Energy consumption; Genetic algorithm; Mathematical optimization; Engineering; Mechanical engineering; Algorithm; Mathematics; Electrical engineering","score_opus":0.023666406982112573,"score_gpt":0.21975866924559162,"score_spread":0.19609226226347903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108203829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27680525,0.0004858783,0.70970803,0.00033676677,0.00014084496,0.0002002815,0.000110002984,0.0005306241,0.011682279],"genre_scores_gemma":[0.97405,0.00010204683,0.023936758,0.000020904401,0.00001693347,0.000048279515,0.000032891636,0.000021586211,0.0017705233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979204,0.000056684185,0.000008084258,0.000047036603,0.000044084976,0.000052073166],"domain_scores_gemma":[0.9998267,0.00006958805,0.000040157727,0.000010275128,0.000029527713,0.000023656257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031027547,0.00047175077,0.0007487337,0.000306185,0.00040139037,0.00084403297,0.00046761878,0.00049707654,0.001761437],"category_scores_gemma":[0.00060206145,0.00024754304,0.0003186873,0.00031717145,0.0002844363,0.000521386,0.00028894012,0.00039703574,0.00015822485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014434762,0.0000900642,0.0006205943,0.00005483318,0.000029591458,0.00005825017,0.000031114407,0.9615452,0.00860327,0.004537781,0.0008835203,0.023401415],"study_design_scores_gemma":[0.00001009103,0.000042693875,0.00024342425,0.0000015272448,0.0000060617676,0.000008495831,0.000010464131,0.99749386,0.0010478202,0.00083917205,0.0002936159,0.0000028108284],"about_ca_topic_score_codex":0.0033996047,"about_ca_topic_score_gemma":0.003935043,"teacher_disagreement_score":0.0033996047,"about_ca_system_score_codex":0.00061099546,"about_ca_system_score_gemma":0.0011362431,"threshold_uncertainty_score":0.0067596436},"labels":[],"label_agreement":null},{"id":"W3108231378","doi":"10.18280/jesa.530515","title":"Fuzzy Logic Controlled Based Ant-Lion Optimization Hybridization for Economic Power Dispatch","year":2020,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electric power system; Fuzzy logic; Minification; Computer science; Schedule; Mathematical optimization; Power (physics); Economic dispatch; Reliability engineering; Control theory (sociology); Engineering; Control (management); Mathematics","score_opus":0.015164975155783774,"score_gpt":0.21962351816572037,"score_spread":0.2044585430099366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108231378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058588523,0.00030131204,0.92054814,0.00022708552,0.00013927247,0.0001485969,0.0000465543,0.00062528823,0.019375311],"genre_scores_gemma":[0.85419863,0.00014261325,0.13683917,0.00011308275,0.000025373118,0.0002498724,0.000073702686,0.000056374756,0.008301182],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979657,0.00005717546,0.000009193438,0.000034232184,0.000078852485,0.000023980358],"domain_scores_gemma":[0.99981517,0.0000813157,0.000029783034,0.000010008563,0.00005339129,0.0000103004295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037895297,0.00053709664,0.00048733587,0.00036860176,0.0003716011,0.0007065894,0.0006572946,0.00056057266,0.0026963572],"category_scores_gemma":[0.0006295011,0.0002603877,0.00037432552,0.00033849664,0.0003061056,0.00032380826,0.00034747034,0.0005274322,0.0003344096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013332692,0.00012131002,0.0007390332,0.00010700121,0.000061483195,0.00010672573,0.000088693414,0.91438466,0.009188896,0.006519275,0.0013071143,0.067242436],"study_design_scores_gemma":[0.000008522841,0.00004135509,0.00008358349,0.000002997559,0.0000047642357,0.0000111061,0.0000054609527,0.99806803,0.0006741566,0.00055265205,0.00054422725,0.0000031385252],"about_ca_topic_score_codex":0.003590657,"about_ca_topic_score_gemma":0.0046124323,"teacher_disagreement_score":0.003590657,"about_ca_system_score_codex":0.0004850282,"about_ca_system_score_gemma":0.00057836017,"threshold_uncertainty_score":0.009020269},"labels":[],"label_agreement":null},{"id":"W3108765643","doi":"10.1109/jiot.2020.3042007","title":"Dynamic Energy Dispatch Based on Deep Reinforcement Learning in IoT-Driven Smart Isolated Microgrids","year":2020,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Reinforcement learning; Markov decision process; Computer science; Partially observable Markov decision process; Leverage (statistics); Smart grid; Mathematical optimization; Markov chain; Markov process; Economic dispatch; Renewable energy; Electric power system; Artificial intelligence; Power (physics); Markov model; Machine learning; Engineering; Mathematics","score_opus":0.006086732957467876,"score_gpt":0.19481799737386096,"score_spread":0.1887312644163931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108765643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16077848,0.0005868584,0.8320436,0.0005475845,0.0001004536,0.00006707549,0.000106263586,0.00085220987,0.0049174814],"genre_scores_gemma":[0.98746616,0.000051142757,0.011667762,0.00006283879,0.00000901787,0.000021978653,0.00003921909,0.000018525681,0.0006633024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976367,0.00006660432,0.000011561486,0.00005731164,0.00005090092,0.000049994727],"domain_scores_gemma":[0.9992372,0.0004259416,0.0001222079,0.000039350503,0.000114130155,0.00006116945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000748566,0.00058308477,0.00081644166,0.00021070719,0.0002122815,0.00058967114,0.00077047595,0.000528591,0.0011078765],"category_scores_gemma":[0.0020655321,0.00030275426,0.00025386625,0.00020526705,0.00048079147,0.0006243828,0.00064192276,0.00085513847,0.00013473532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003126211,0.000023459363,0.00031915033,0.000013915713,0.000009307502,0.00002781573,0.000011601802,0.99035686,0.00022380736,0.0008913831,0.00017649359,0.007914893],"study_design_scores_gemma":[0.000002651936,0.0000050817166,0.000027542197,9.094053e-7,8.240856e-7,0.0000016718167,0.0000012885969,0.99949837,0.000051151856,0.00038013177,0.000029573383,7.469243e-7],"about_ca_topic_score_codex":0.00819848,"about_ca_topic_score_gemma":0.0065149395,"teacher_disagreement_score":0.00819848,"about_ca_system_score_codex":0.0008242571,"about_ca_system_score_gemma":0.0009722317,"threshold_uncertainty_score":0.016301513},"labels":[],"label_agreement":null},{"id":"W3109323998","doi":"10.1109/ccece47787.2020.9255743","title":"Optimal Demand Control of Electric Water Heaters to Accommodate the Integration of Plug-in Electric Vehicles in Residential Distribution Networks","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Thermostat; Solver; Integer programming; Transformer; Linear programming; Computer science; Mathematical optimization; Automotive engineering; Peak demand; Demand response; Electricity; Engineering; Voltage; Mathematics; Electrical engineering","score_opus":0.006690072386420381,"score_gpt":0.19244439420477566,"score_spread":0.18575432181835527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109323998","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33873016,0.00030911434,0.6355928,0.0004477063,0.00009295097,0.00019786488,0.0003722509,0.00068289944,0.023574295],"genre_scores_gemma":[0.99364763,0.000030521835,0.0051982114,0.000010945554,0.000003303407,0.000025490252,0.000033291242,0.000015191601,0.001035315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997367,0.000084468214,0.000009553122,0.00005085821,0.000044396307,0.00007395917],"domain_scores_gemma":[0.9996716,0.00016009722,0.000052865948,0.00001639353,0.00007695413,0.000022020264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066229684,0.00055762066,0.00043596915,0.0002804943,0.00029180179,0.00080624264,0.00050811947,0.00040052307,0.0019296905],"category_scores_gemma":[0.0012056988,0.00042725654,0.00025435543,0.00027680688,0.00028859434,0.0005724304,0.0004689765,0.00056568533,0.00019382761],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060584807,0.000038802387,0.00033067344,0.000026397085,0.000007789862,0.000025858291,0.000021303376,0.99066013,0.0020447392,0.0014831004,0.00035547948,0.004945052],"study_design_scores_gemma":[0.000006658578,0.00002539303,0.00016588967,0.0000017991738,0.0000034340044,0.0000029463297,0.000016678521,0.9981895,0.00080714584,0.0005325088,0.00024570833,0.00000232196],"about_ca_topic_score_codex":0.005884499,"about_ca_topic_score_gemma":0.00796418,"teacher_disagreement_score":0.005884499,"about_ca_system_score_codex":0.00087056315,"about_ca_system_score_gemma":0.0007704991,"threshold_uncertainty_score":0.011700511},"labels":[],"label_agreement":null},{"id":"W3109443483","doi":"10.1049/gtd2.12026","title":"Increasing distributed generation hosting capacity in distribution systems via optimal coordination of electric vehicle aggregators","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Electric vehicle; Distributed generation; Computer science; Distribution (mathematics); Distributed computing; Engineering; Electrical engineering; Mathematics; Renewable energy","score_opus":0.024946198028666346,"score_gpt":0.20123847754754454,"score_spread":0.1762922795188782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109443483","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36212462,0.00019230292,0.63316166,0.000119337354,0.00001872495,0.00006132371,0.000069982605,0.00025062953,0.004001437],"genre_scores_gemma":[0.99322116,0.000016988393,0.006501898,0.0000038418257,0.0000031419377,0.00001009433,0.000010041637,0.0000048721654,0.00022797236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997403,0.00010839643,0.000009189484,0.00005886458,0.000036260783,0.000047062524],"domain_scores_gemma":[0.99919206,0.00047179897,0.0001785167,0.000042220094,0.00007841273,0.000037000467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005830653,0.0006898288,0.00046664296,0.00032853885,0.00019539877,0.00073851965,0.00045116417,0.00029204699,0.00056991115],"category_scores_gemma":[0.0014986115,0.00030324765,0.00023512372,0.00024665604,0.0003307201,0.00049835676,0.00038270195,0.0003089401,0.000065794775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036698613,0.000013399959,0.00037401912,0.000006918315,0.000008685095,0.000017915676,0.0000081255785,0.9936155,0.000901537,0.00060211244,0.00004528706,0.0043697003],"study_design_scores_gemma":[0.000004531225,0.00002143413,0.00014965853,0.000001263616,0.000004380912,0.0000033719734,0.000005571477,0.9988996,0.00053067843,0.0003303737,0.000047266272,0.0000018542379],"about_ca_topic_score_codex":0.0044444683,"about_ca_topic_score_gemma":0.0033631937,"teacher_disagreement_score":0.0044444683,"about_ca_system_score_codex":0.0006413189,"about_ca_system_score_gemma":0.00047938127,"threshold_uncertainty_score":0.008837223},"labels":[],"label_agreement":null},{"id":"W3109986448","doi":"10.1109/ccece47787.2020.9255750","title":"Demand Charges Minimization for Ontario Class-A Customers Based on the Optimization of Energy Storage System","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Minification; Sizing; Electricity; Software deployment; Computer science; Energy storage; Energy minimization; Scheduling (production processes); Electricity market; Peak demand; Mathematical optimization; Load shifting; Demand response; Operations research; Electrical engineering; Engineering; Power (physics); Mathematics","score_opus":0.012505845224586927,"score_gpt":0.1727509299698421,"score_spread":0.16024508474525517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109986448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8858126,0.00026096226,0.06827564,0.00070812635,0.000032930304,0.0002232184,0.0008968145,0.00027030273,0.043519367],"genre_scores_gemma":[0.9916996,0.000050701598,0.0042024106,0.000019057576,0.0000031706213,0.00001537333,0.00014347277,0.000013693813,0.0038525166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998733,0.000018577677,0.0000036917572,0.000014812347,0.000037654165,0.000051987332],"domain_scores_gemma":[0.9998791,0.000035458033,0.000013253717,0.00000403898,0.000053106764,0.00001499799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014717838,0.0004978079,0.0003561998,0.00022082038,0.0005814382,0.00076021766,0.00054947764,0.0004049406,0.003819647],"category_scores_gemma":[0.00038349026,0.0001796576,0.00022841278,0.0005122574,0.00023657636,0.00027210946,0.00024426216,0.0002770683,0.00016003229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013478733,0.00005180497,0.004604595,0.000046797337,0.000013888231,0.00018414883,0.000066127504,0.9678944,0.0033877308,0.0027836834,0.0040235,0.0168086],"study_design_scores_gemma":[0.00001367325,0.000039638922,0.0029994468,0.0000027106996,0.000008224471,0.000021759233,0.000114952534,0.9946683,0.00069342606,0.0004159047,0.0010146592,0.0000074143695],"about_ca_topic_score_codex":0.41761684,"about_ca_topic_score_gemma":0.60381174,"teacher_disagreement_score":0.58238316,"about_ca_system_score_codex":0.0046254857,"about_ca_system_score_gemma":0.0037272377,"threshold_uncertainty_score":0.8303721},"labels":[],"label_agreement":null},{"id":"W3110236022","doi":"10.1016/j.tej.2020.106878","title":"High electrification futures: Impacts to the U.S. bulk power system","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Office of Energy Efficiency; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; Environmental Defense Fund; Natural Resources Canada","keywords":"Electrification; Futures contract; Environmental economics; Natural resource economics; Electricity; Rural electrification; Business; Economics; Engineering; Electrical engineering; Finance","score_opus":0.006635990697534596,"score_gpt":0.1794587249971947,"score_spread":0.1728227342996601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110236022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79558796,0.00206814,0.0012039506,0.06562819,0.00087879517,0.000023428614,0.0054563577,0.00021058162,0.12894247],"genre_scores_gemma":[0.99004376,0.0010548868,0.00043703688,0.00104565,0.00008745924,0.000006223779,0.00078787556,0.000027756065,0.00650931],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975985,0.000077633806,0.000005736952,0.000016219366,0.000086132815,0.00005440557],"domain_scores_gemma":[0.99943525,0.00014423825,0.00005559151,0.00001884366,0.00021029435,0.00013567695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048095812,0.00027250437,0.000119878765,0.00032191587,0.0007397432,0.0018159162,0.0002902148,0.0010997374,0.00801246],"category_scores_gemma":[0.0014466061,0.000100109435,0.00023517148,0.00083185156,0.00036541754,0.001499712,0.00082720217,0.0009805692,0.0005039635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018062595,0.00066717266,0.17830756,0.0003278985,0.00020731651,0.0039212722,0.0013290507,0.0924169,0.007840362,0.09336231,0.36803484,0.25177902],"study_design_scores_gemma":[0.0002642434,0.0010149056,0.3954626,0.00037028748,0.00027154182,0.0009986832,0.018981911,0.122598745,0.007820725,0.10857615,0.34346527,0.00017503215],"about_ca_topic_score_codex":0.0648636,"about_ca_topic_score_gemma":0.10988421,"teacher_disagreement_score":0.0648636,"about_ca_system_score_codex":0.0016703518,"about_ca_system_score_gemma":0.0015753148,"threshold_uncertainty_score":0.12897211},"labels":[],"label_agreement":null},{"id":"W3112335786","doi":"10.1016/j.ijepes.2020.106646","title":"Optimal bidding strategy of a virtual power plant in day-ahead energy and frequency regulation markets: A deep learning-based approach","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":159,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Virtual power plant; Bidding; Exploit; Demand response; Profit (economics); Diversification (marketing strategy); Electricity market; Computer science; Renewable energy; Electricity; Distributed generation; Engineering; Reliability engineering; Operations research; Electrical engineering; Economics; Business; Computer security; Microeconomics","score_opus":0.007882975602796055,"score_gpt":0.1955890147772782,"score_spread":0.18770603917448214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112335786","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48976147,0.00051287434,0.48935202,0.0021507312,0.00011242826,0.00009739055,0.0003073813,0.0003300778,0.01737563],"genre_scores_gemma":[0.9919022,0.000040800347,0.0057154777,0.00006575287,0.000012877528,0.000014904184,0.00003896023,0.00001663386,0.002192367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973696,0.00009531988,0.0000101302585,0.000047763755,0.000033394885,0.00007638356],"domain_scores_gemma":[0.9986368,0.000872549,0.00012741162,0.00003233699,0.00016076426,0.00017025266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001185417,0.00058684254,0.0013189882,0.00044568576,0.00041048994,0.0015067245,0.001279411,0.0020837123,0.004219102],"category_scores_gemma":[0.0026633143,0.00085043645,0.00051391654,0.00032346547,0.000944435,0.0015639613,0.00078819494,0.0012869806,0.00029685887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010557594,0.00004322345,0.00056759664,0.000022241313,0.000018249584,0.00007463003,0.000018582145,0.9907913,0.00035951848,0.0036975895,0.00049119873,0.0038102749],"study_design_scores_gemma":[0.0000030578783,0.000005764395,0.00005092252,0.0000010674016,0.0000017280837,0.0000034973095,0.0000034527889,0.99919456,0.000028656981,0.00069051504,0.000015296306,0.0000014409889],"about_ca_topic_score_codex":0.010239624,"about_ca_topic_score_gemma":0.011266133,"teacher_disagreement_score":0.010239624,"about_ca_system_score_codex":0.0010328902,"about_ca_system_score_gemma":0.0016273733,"threshold_uncertainty_score":0.020360053},"labels":[],"label_agreement":null},{"id":"W3113557157","doi":"10.18280/mmep.070408","title":"Feasibility Study of Grid-Connected PV System for Peak Demand Reduction of a Residential Building in Tehran, Iran","year":2020,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fossil fuel; Renewable energy; Grid; Photovoltaic system; Environmental economics; Automotive engineering; Capital cost; Battery (electricity); Environmental science; Energy storage; Computer science; Reliability engineering; Engineering; Electrical engineering; Economics; Power (physics); Waste management","score_opus":0.042763913163631276,"score_gpt":0.2256273021917727,"score_spread":0.18286338902814142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113557157","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9887227,0.000082664366,0.0044989837,0.00018243285,0.000017063638,0.00009273955,0.0001499044,0.00006517611,0.0061882148],"genre_scores_gemma":[0.9986457,0.00003097666,0.0008110433,0.0000049034675,0.0000018847667,0.000009465248,0.000037316833,0.0000034302275,0.00045522058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972194,0.00010787017,0.000010014904,0.000030216446,0.00007961065,0.000050282782],"domain_scores_gemma":[0.99962354,0.00016331737,0.00003173161,0.000017571923,0.0001327567,0.00003109458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005776632,0.0004526385,0.0004471869,0.00036837606,0.00053766574,0.00075992936,0.0007670373,0.00048443172,0.002526702],"category_scores_gemma":[0.0005189565,0.00025752987,0.00061434164,0.00028878674,0.00025811465,0.0005709523,0.0003278189,0.00040022843,0.00024155062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013642656,0.001469156,0.029629843,0.00074917666,0.00017134691,0.004355156,0.000518964,0.88024884,0.04545043,0.0044115013,0.0035529258,0.028078424],"study_design_scores_gemma":[0.00017378145,0.0016902282,0.022984149,0.00002408497,0.00012693467,0.00029084468,0.0014162206,0.9576509,0.012573151,0.0013442802,0.001693943,0.000031510473],"about_ca_topic_score_codex":0.009998342,"about_ca_topic_score_gemma":0.012970498,"teacher_disagreement_score":0.009998342,"about_ca_system_score_codex":0.00084401725,"about_ca_system_score_gemma":0.00085586926,"threshold_uncertainty_score":0.019880295},"labels":[],"label_agreement":null},{"id":"W3113787841","doi":"10.1016/j.tej.2020.106903","title":"Going viral: The impacts of covid19 on retail electricity","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Remuneration; Electricity; Business; Business model; Key (lock); Coronavirus disease 2019 (COVID-19); Mains electricity; Grid; Industrial organization; Environmental economics; Commerce; Economics; Marketing; Finance; Engineering; Computer science; Computer security; Medicine","score_opus":0.014930916475880917,"score_gpt":0.20505439925811406,"score_spread":0.19012348278223315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113787841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.509977,0.0022886188,0.00061053096,0.06300874,0.0022009097,0.000066334374,0.0035800042,0.00028262573,0.41798517],"genre_scores_gemma":[0.9723536,0.000845984,0.00015642849,0.006458088,0.000578671,0.00001388125,0.00095906534,0.00013139339,0.018503021],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99802905,0.000515235,0.000045240926,0.00010871318,0.000709752,0.0005919961],"domain_scores_gemma":[0.99164295,0.0023615053,0.0010029315,0.00031957665,0.0025497058,0.0021233417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018819324,0.00022934964,0.00018294658,0.0009212805,0.0028514508,0.0076394146,0.00097475963,0.0022807915,0.034488115],"category_scores_gemma":[0.011034142,0.000167793,0.00039666935,0.001455119,0.0016524924,0.0039404253,0.0031063317,0.0033604235,0.0033973],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016048315,0.001306072,0.22155173,0.00037526013,0.00013947333,0.0025818015,0.0066421614,0.0038920627,0.0018613434,0.10751091,0.5351562,0.117378145],"study_design_scores_gemma":[0.0001764738,0.0007481901,0.31123486,0.00076820544,0.00015949114,0.00093756756,0.069041915,0.010970259,0.002621441,0.032173645,0.57088137,0.00028653388],"about_ca_topic_score_codex":0.051254783,"about_ca_topic_score_gemma":0.087839656,"teacher_disagreement_score":0.051254783,"about_ca_system_score_codex":0.0030416588,"about_ca_system_score_gemma":0.0025014265,"threshold_uncertainty_score":0.11537421},"labels":[],"label_agreement":null},{"id":"W3113846595","doi":"10.1109/pesgm41954.2020.9281703","title":"Deep Reinforcement Learning for Direct Load Control in Distribution Networks","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"News aggregator; Reinforcement learning; Markov decision process; Computer science; Control (management); Markov process; Artificial neural network; Mathematical optimization; Demand response; Markov chain; Operations research; Artificial intelligence; Engineering; Electricity; Machine learning","score_opus":0.006725091412160987,"score_gpt":0.18288117594952855,"score_spread":0.17615608453736756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113846595","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09148185,0.0004490329,0.9023478,0.0004945898,0.00005747048,0.000042560234,0.00006139619,0.0005988502,0.0044663697],"genre_scores_gemma":[0.9777013,0.00007773414,0.020277902,0.000070207934,0.000014825538,0.000050965195,0.00004891077,0.000023786202,0.0017342874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974054,0.00008638552,0.000010025755,0.00005308305,0.000047467853,0.00006252732],"domain_scores_gemma":[0.99920875,0.0005178415,0.00007923923,0.00003453113,0.00011682544,0.000042851745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087602006,0.00072082295,0.0007459046,0.00023028551,0.00028269147,0.0005095199,0.0007942447,0.0006932281,0.0016644987],"category_scores_gemma":[0.0022576808,0.0003750428,0.00026349543,0.00023595487,0.0006773043,0.0006098302,0.0006936186,0.0012697079,0.00017733514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026882391,0.000020369858,0.0002743521,0.0000133982385,0.000008932031,0.00001906836,0.000011777964,0.987356,0.00029989806,0.001917185,0.00025827222,0.009793864],"study_design_scores_gemma":[0.0000019734634,0.000003860384,0.000017837594,7.603447e-7,6.5897746e-7,8.432928e-7,7.2822183e-7,0.99929917,0.000050102346,0.0005950031,0.000028652876,4.837204e-7],"about_ca_topic_score_codex":0.009964966,"about_ca_topic_score_gemma":0.009870852,"teacher_disagreement_score":0.009964966,"about_ca_system_score_codex":0.0012337074,"about_ca_system_score_gemma":0.0010967333,"threshold_uncertainty_score":0.019813955},"labels":[],"label_agreement":null},{"id":"W3113970002","doi":"10.3390/app11010180","title":"Incentive Price-Based Demand Response in Active Distribution Grids","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Toronto; Energinet.dk","keywords":"Demand response; Smart grid; Computer science; Incentive; Grid; Distributed generation; Voltage; Peak demand; Context (archaeology); Reliability engineering; Electrical engineering; Automotive engineering; Electricity; Engineering; Renewable energy; Economics; Microeconomics","score_opus":0.01339789565888278,"score_gpt":0.2090334577807949,"score_spread":0.19563556212191213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113970002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08598364,0.00016098117,0.9085426,0.00023241233,0.000055209664,0.00008224388,0.00003916755,0.00036103372,0.0045427294],"genre_scores_gemma":[0.97011346,0.000048422906,0.028230568,0.000028796061,0.000016500851,0.000037298752,0.000020502102,0.00002375171,0.001480654],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934083,0.00032036254,0.000025451769,0.00009984632,0.00014901483,0.0000643892],"domain_scores_gemma":[0.99868995,0.00082418433,0.00015147075,0.00007190535,0.00019885975,0.00006376837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013024656,0.00032759897,0.00061414787,0.00023299252,0.0003442895,0.0008930673,0.001108729,0.0005723744,0.00165716],"category_scores_gemma":[0.0029212644,0.00030316354,0.00024467657,0.0003443612,0.0005942177,0.0009201615,0.00057981117,0.0007061165,0.00018982327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018831856,0.00011927523,0.00068522326,0.00006239239,0.000016853219,0.000121699886,0.00009430661,0.9390529,0.002710934,0.02030905,0.00080503756,0.035834033],"study_design_scores_gemma":[0.000011395686,0.00001895849,0.00006902067,0.0000011181418,0.0000015385848,0.000008463556,0.000007699546,0.9968635,0.0003157947,0.002511604,0.00018815699,0.000002772328],"about_ca_topic_score_codex":0.0032765483,"about_ca_topic_score_gemma":0.002407732,"teacher_disagreement_score":0.0032765483,"about_ca_system_score_codex":0.00087694253,"about_ca_system_score_gemma":0.000617301,"threshold_uncertainty_score":0.006888151},"labels":[],"label_agreement":null},{"id":"W3114687565","doi":"10.1109/tsg.2020.3048397","title":"A New Method for Peer Matching and Negotiation of Prosumers in Peer-to-Peer Energy Markets","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":128,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Scalability; Negotiation; Computer science; Peer-to-peer; Matching (statistics); Database transaction; Distributed computing; Process (computing); Transaction cost; Grid; Microeconomics; Economics","score_opus":0.014272582664718697,"score_gpt":0.2472437944312475,"score_spread":0.2329712117665288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114687565","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003925556,0.00015757837,0.9914349,0.00012567737,0.00013280507,0.00028384323,0.000028240798,0.00027221392,0.0036392412],"genre_scores_gemma":[0.21771942,0.0003261875,0.7696254,0.00018680905,0.00026437998,0.00080844667,0.00011612253,0.00015163112,0.010801543],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964948,0.0010958844,0.00023714564,0.00068041665,0.001261733,0.00023013195],"domain_scores_gemma":[0.9979054,0.0009420122,0.00018248482,0.00040131714,0.00041542086,0.00015344546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029661537,0.0008186716,0.0015933083,0.001271562,0.0019348927,0.0020579335,0.0037387772,0.0021688072,0.0064847604],"category_scores_gemma":[0.0068960125,0.00053696765,0.0011114691,0.0015362464,0.0012882965,0.004038649,0.0033662193,0.0018479633,0.0015281594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005388393,0.00037929983,0.0010503181,0.0005605485,0.0002526019,0.0010607006,0.0011206892,0.17585367,0.024918916,0.38079157,0.010893502,0.40257937],"study_design_scores_gemma":[0.00012671771,0.00018742958,0.00019353605,0.000028003615,0.00005140034,0.0005691694,0.0001391828,0.9004403,0.0052254414,0.06698384,0.025985796,0.00006916646],"about_ca_topic_score_codex":0.0011888444,"about_ca_topic_score_gemma":0.001117336,"teacher_disagreement_score":0.0064847604,"about_ca_system_score_codex":0.00082661037,"about_ca_system_score_gemma":0.001532404,"threshold_uncertainty_score":0.021693647},"labels":[],"label_agreement":null},{"id":"W3115245816","doi":"10.1109/pesgm41954.2020.9281946","title":"Deep Reinforcement Learning For Peak Load Reduction In Aggregated Residential Houses","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Unavailability; Reinforcement learning; Demand response; Computer science; Energy consumption; Peak demand; Flexibility (engineering); Electricity; Scheduling (production processes); Incentive; Reduction (mathematics); Load management; Cluster (spacecraft); Mathematical optimization; Operations research; Artificial intelligence; Reliability engineering; Engineering; Computer network; Electrical engineering; Economics; Mathematics; Statistics","score_opus":0.013961104200238692,"score_gpt":0.20783903191419079,"score_spread":0.1938779277139521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115245816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29333246,0.00052434,0.7000449,0.00041976175,0.000065503606,0.00003405069,0.00008847487,0.0012538214,0.0042367275],"genre_scores_gemma":[0.99135876,0.000031099607,0.007702999,0.000027178616,0.0000063633183,0.0000109771645,0.00002974606,0.000010826827,0.0008220623],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998616,0.00003646275,0.0000058329933,0.000035247638,0.000024536868,0.000036304766],"domain_scores_gemma":[0.99973303,0.00013745436,0.00003792181,0.000019020645,0.000054346136,0.000018237248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041531344,0.000468212,0.0005019985,0.00016211752,0.0001613709,0.0003359317,0.0005429643,0.00038262986,0.0009373017],"category_scores_gemma":[0.0009113525,0.00023280288,0.00023904555,0.0001709,0.00034052267,0.00037253415,0.00043345478,0.0006689471,0.00012047467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006008326,0.000043925207,0.00055315916,0.000016630936,0.000016926248,0.00002688551,0.000016698194,0.97859347,0.0011830478,0.00073079433,0.00033979389,0.018418627],"study_design_scores_gemma":[0.0000013990297,0.0000052631017,0.00004377112,4.7853564e-7,8.6245814e-7,8.321672e-7,9.076213e-7,0.9996233,0.00012029765,0.00018325698,0.000019170187,4.9793294e-7],"about_ca_topic_score_codex":0.007565804,"about_ca_topic_score_gemma":0.0072225505,"teacher_disagreement_score":0.007565804,"about_ca_system_score_codex":0.0006333201,"about_ca_system_score_gemma":0.0005038264,"threshold_uncertainty_score":0.015043497},"labels":[],"label_agreement":null},{"id":"W3115779604","doi":"10.1109/pesgm41954.2020.9282108","title":"Regression-Based Wintertime Energy Consumption Prediction for Cold Load Pick-Up Management","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Smart meter; Benchmark (surveying); Linear regression; Computer science; Regression; Energy consumption; Regression analysis; Smart grid; Environmental science; Statistics; Engineering; Mathematics; Machine learning","score_opus":0.01750847537752744,"score_gpt":0.20358296945316684,"score_spread":0.1860744940756394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115779604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68534434,0.0006145926,0.30505538,0.00027958135,0.000090645066,0.0000507436,0.0013859454,0.004092354,0.0030864647],"genre_scores_gemma":[0.98193765,0.00012710887,0.015804078,0.00002004099,0.000021979908,0.000020112158,0.001014467,0.000079659374,0.0009749554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979895,0.00005772579,0.000012267975,0.00006654413,0.000039612838,0.000024922821],"domain_scores_gemma":[0.99956983,0.00019936246,0.000068455796,0.00004075553,0.00010700095,0.0000146709135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054657046,0.0007211273,0.00059352285,0.00054998166,0.00014752486,0.00045409077,0.0005984994,0.00036712812,0.001411746],"category_scores_gemma":[0.0012197224,0.00021683848,0.0004079879,0.0006980368,0.00010091155,0.0005508967,0.00019186694,0.0005493305,0.00072797306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033803485,0.00020889037,0.012884277,0.00009458112,0.000093998155,0.00006986682,0.000039808914,0.89650756,0.0068093343,0.00034540225,0.0019153315,0.08069289],"study_design_scores_gemma":[0.0000025887912,0.000020134059,0.0030097282,0.0000020486289,0.000006616904,0.0000055420383,0.000007218096,0.9956677,0.0010820265,0.000059420632,0.00013306373,0.0000038795038],"about_ca_topic_score_codex":0.012778957,"about_ca_topic_score_gemma":0.013836152,"teacher_disagreement_score":0.012778957,"about_ca_system_score_codex":0.00033933608,"about_ca_system_score_gemma":0.00028874516,"threshold_uncertainty_score":0.025409162},"labels":[],"label_agreement":null},{"id":"W3115997979","doi":"10.1109/smartgridcomm47815.2020.9302992","title":"Decentralized Microgrid Energy Management: A Multi-agent Correlated Q-learning Approach","year":2020,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Canada Research Chairs","keywords":"Microgrid; Nash equilibrium; Convergence (economics); Smart grid; Energy management system; Computer science; Energy management; Revenue; Correlated equilibrium; Renewable energy; Mathematical optimization; Competition (biology); Multi-agent system; Operations research; Game theory; Energy (signal processing); Microeconomics; Control (management); Economics; Equilibrium selection; Artificial intelligence; Mathematics; Engineering; Repeated game","score_opus":0.018208962483692463,"score_gpt":0.20441234099728076,"score_spread":0.18620337851358829,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115997979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033970986,0.00028031343,0.9614563,0.00038649142,0.00004551561,0.00006513881,0.000035344703,0.0001861055,0.0035738444],"genre_scores_gemma":[0.9525003,0.00014432555,0.045274332,0.00013431124,0.00004725562,0.00007635313,0.00003812361,0.000025030655,0.0017599413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993499,0.00027081848,0.000026094418,0.00013525611,0.00010989723,0.00010811133],"domain_scores_gemma":[0.998679,0.0006440537,0.00020117554,0.00009942978,0.0002604125,0.0001159247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014313911,0.0006591458,0.0012317254,0.0002780678,0.0004804447,0.0010135816,0.0015380944,0.0009472363,0.0019120588],"category_scores_gemma":[0.0022101505,0.0004356648,0.0005307533,0.00048106007,0.0008171023,0.00095066795,0.0012306209,0.001032053,0.0002161068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004876467,0.000041855794,0.00041227674,0.000028536693,0.000035456047,0.00005497765,0.00003223449,0.9781014,0.00041064023,0.0077588987,0.000433218,0.012641779],"study_design_scores_gemma":[0.000008486151,0.0000129054015,0.000033287135,0.0000014167615,0.0000034718523,0.000005311906,0.000003930494,0.99786747,0.000047804373,0.0019056222,0.000108521985,0.0000016580119],"about_ca_topic_score_codex":0.0047718063,"about_ca_topic_score_gemma":0.0030755582,"teacher_disagreement_score":0.0047718063,"about_ca_system_score_codex":0.0007831361,"about_ca_system_score_gemma":0.0013433198,"threshold_uncertainty_score":0.009488046},"labels":[],"label_agreement":null},{"id":"W3116021410","doi":"10.1109/uemcon51285.2020.9298157","title":"Energy Disaggregation using Multilabel Binarization and Gaussian Naive Bayes Classifier","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Computer science; Naive Bayes classifier; Jaccard index; Gaussian process; Artificial intelligence; Classifier (UML); Machine learning; Gaussian; Bayesian probability; Test data; Energy (signal processing); Data mining; Pattern recognition (psychology); Statistics; Mathematics; Support vector machine","score_opus":0.01999092354797935,"score_gpt":0.19908172045573228,"score_spread":0.17909079690775292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116021410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.084663965,0.0011301643,0.90378714,0.00056816277,0.00026559114,0.00023131937,0.0011902237,0.0046960614,0.0034674106],"genre_scores_gemma":[0.6717174,0.00039513104,0.31618437,0.0004322893,0.00017548069,0.0002485417,0.004837075,0.00025861652,0.005751067],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799806,0.00043441725,0.00016843376,0.00064084743,0.0005114393,0.00024674315],"domain_scores_gemma":[0.9988875,0.0003775543,0.00009847176,0.00015450531,0.00042837174,0.000053717427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018518196,0.0012260713,0.0017020919,0.002237607,0.0010191954,0.0014058213,0.0013517914,0.001272178,0.0021614549],"category_scores_gemma":[0.004137055,0.00042639705,0.0016490472,0.0019764842,0.00060475175,0.0015607168,0.0009400581,0.0016316645,0.0016226001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010939582,0.00053801,0.015201628,0.0002285644,0.00028168948,0.00028148995,0.0004631823,0.3035629,0.011026676,0.0054845023,0.011160059,0.65067726],"study_design_scores_gemma":[0.00001371865,0.000047347243,0.0016966528,0.000017464532,0.000031759282,0.00004946923,0.000076158816,0.98999596,0.0023397447,0.0041771126,0.0015311115,0.000023527471],"about_ca_topic_score_codex":0.03145027,"about_ca_topic_score_gemma":0.02951503,"teacher_disagreement_score":0.03145027,"about_ca_system_score_codex":0.0015721103,"about_ca_system_score_gemma":0.00154727,"threshold_uncertainty_score":0.06253439},"labels":[],"label_agreement":null},{"id":"W3116851389","doi":"10.3390/s21010130","title":"Demand Management for Optimized Energy Usage and Consumer Comfort Using Sequential Optimization","year":2020,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Thermal comfort; HVAC; Computer science; Demand response; Energy consumption; Scheduling (production processes); Linear programming; Efficient energy use; Air conditioning; Energy management; Mathematical optimization; Reliability engineering; Engineering; Energy (signal processing); Electricity; Operations management; Algorithm","score_opus":0.021128531340889115,"score_gpt":0.2179576694929108,"score_spread":0.1968291381520217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116851389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08482944,0.00011659783,0.9075413,0.0001923259,0.000033752298,0.000077316974,0.00010574733,0.00025485264,0.0068487],"genre_scores_gemma":[0.92633057,0.00009335565,0.069765896,0.00006492857,0.000017009956,0.00011687086,0.000115857016,0.00006906919,0.0034264817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996487,0.00010209107,0.000013517654,0.000078745696,0.000086695065,0.000070239],"domain_scores_gemma":[0.9997825,0.0000893119,0.000039676383,0.000015833642,0.00005237233,0.000020337473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005055671,0.0007571003,0.0006297211,0.00027169625,0.0003440969,0.00077591394,0.0005819583,0.00044014474,0.0023840521],"category_scores_gemma":[0.0007588548,0.0004076788,0.00061616534,0.00047904646,0.00030639465,0.000655518,0.000562479,0.0005153165,0.00019123519],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038282662,0.00003580038,0.0003167571,0.000022686203,0.000015700043,0.0000203046,0.00001931238,0.9885323,0.001949699,0.002184323,0.00028824402,0.006576618],"study_design_scores_gemma":[0.0000035646049,0.00001788016,0.00006692842,9.247455e-7,0.0000031950533,0.000002666534,0.0000063734524,0.9985745,0.00025771343,0.0009105008,0.00015427507,0.0000014517549],"about_ca_topic_score_codex":0.0073579885,"about_ca_topic_score_gemma":0.007428675,"teacher_disagreement_score":0.0073579885,"about_ca_system_score_codex":0.0008115519,"about_ca_system_score_gemma":0.0011472803,"threshold_uncertainty_score":0.014630318},"labels":[],"label_agreement":null},{"id":"W3117044811","doi":"10.1109/pesgm41954.2020.9281577","title":"Optimal Configuration of Energy Storage System Considering Uncertainty of Load and Wind Generation","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Natural Science Foundation of China","keywords":"Wind power; Computer science; Particle swarm optimization; Mathematical optimization; Electric power system; Energy storage; Simulated annealing; Power (physics); Engineering; Algorithm","score_opus":0.01665053913672874,"score_gpt":0.18775632546945817,"score_spread":0.17110578633272944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117044811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13525046,0.0008355814,0.852555,0.00041229118,0.00007061864,0.00014168349,0.00013783394,0.00036808877,0.010228521],"genre_scores_gemma":[0.9801379,0.00013695432,0.018602619,0.00002056103,0.000010354217,0.000058318874,0.00003871087,0.000014154063,0.000980464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997192,0.000094295254,0.00001503044,0.00006822018,0.00005514721,0.000048036072],"domain_scores_gemma":[0.9997737,0.00008342592,0.000055746106,0.000018251769,0.0000509566,0.000017824172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003968049,0.00079433556,0.0007812827,0.00044354307,0.00046636327,0.0010520603,0.0006268343,0.0008020439,0.0014463608],"category_scores_gemma":[0.00096814835,0.00049859006,0.0004586586,0.00042842014,0.000495753,0.00092163647,0.0005005092,0.00049331615,0.00015180228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031725165,0.000010817821,0.00035851385,0.000021590184,0.000014994814,0.000058604197,0.000018713814,0.9905625,0.0010701437,0.0014208575,0.00021955762,0.0062121167],"study_design_scores_gemma":[0.000007120163,0.000019804032,0.00016303151,0.000003631619,0.000009060551,0.000016111053,0.000014198255,0.99787104,0.00042210665,0.0013314141,0.00013793276,0.000004585231],"about_ca_topic_score_codex":0.005432431,"about_ca_topic_score_gemma":0.00613957,"teacher_disagreement_score":0.005432431,"about_ca_system_score_codex":0.0008079354,"about_ca_system_score_gemma":0.0011280274,"threshold_uncertainty_score":0.010801613},"labels":[],"label_agreement":null},{"id":"W3117335792","doi":"10.1109/pesgm41954.2020.9281513","title":"State Space Model of Aggregated TCLs for Frequency Regulation with a Low Communication Requirement","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Control theory (sociology); Control (management); Computer science; Population; Automatic frequency control; State (computer science); Space (punctuation); State space; SIGNAL (programming language); Mathematics; Telecommunications; Algorithm","score_opus":0.020783535282066595,"score_gpt":0.20478106774387206,"score_spread":0.18399753246180547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117335792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017889045,0.00013624322,0.9721891,0.00019235432,0.00007331787,0.000038931954,0.00017236068,0.00035876472,0.008949808],"genre_scores_gemma":[0.96632063,0.00026468837,0.021900367,0.00007903879,0.00008237889,0.00020138733,0.00028543288,0.000058708923,0.010807409],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997098,0.00006321804,0.0000123164655,0.000071151866,0.00010856672,0.000035000186],"domain_scores_gemma":[0.9997589,0.000071512455,0.00004591271,0.00003011816,0.00008161598,0.000011999867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032100474,0.00059502246,0.0005792249,0.000256387,0.00040022098,0.0010663712,0.00089415757,0.0006811429,0.003474268],"category_scores_gemma":[0.0006618813,0.00018740086,0.00050739903,0.00035474126,0.0005409461,0.0009317958,0.000495268,0.0009681217,0.00074597925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039174574,0.000021157537,0.00035425535,0.000035818604,0.000016104404,0.00005250693,0.000056758585,0.9679837,0.0026791359,0.020364197,0.0006922057,0.00770498],"study_design_scores_gemma":[0.0000027567173,0.000009189969,0.00004487049,0.0000014047196,0.000002661724,0.0000046135215,0.0000032233045,0.99813443,0.00014982227,0.001305238,0.00033985628,0.0000019449017],"about_ca_topic_score_codex":0.00779889,"about_ca_topic_score_gemma":0.0051572863,"teacher_disagreement_score":0.00779889,"about_ca_system_score_codex":0.00063181465,"about_ca_system_score_gemma":0.00067862234,"threshold_uncertainty_score":0.015506983},"labels":[],"label_agreement":null},{"id":"W3117564018","doi":"10.1109/pesgm41954.2020.9281394","title":"Flexibility of Residential Loads for Demand Response Provisions in Smart Grid","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flexibility (engineering); Smart grid; Demand response; Grid; Computer science; Energy consumption; Scheme (mathematics); Energy management system; Peak demand; Consumption (sociology); Energy management; Load management; Environmental economics; Energy (signal processing); Engineering; Electricity; Electrical engineering","score_opus":0.02352652507405171,"score_gpt":0.24506827460532693,"score_spread":0.22154174953127523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117564018","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3943709,0.00032144785,0.58036643,0.0004371355,0.000039125218,0.00016175942,0.0001719498,0.00037959474,0.023751704],"genre_scores_gemma":[0.9944376,0.000026209567,0.0049128584,0.000008601555,0.0000045759516,0.000014564413,0.000015907537,0.000008729314,0.0005709149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995467,0.00018854564,0.000013825091,0.00006993462,0.00010113818,0.000079824364],"domain_scores_gemma":[0.9997861,0.000096468735,0.00003804452,0.000031499767,0.000027927588,0.00002004448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062293455,0.0005213589,0.00047996335,0.00023337848,0.00041582165,0.00089107576,0.00052756036,0.00047646638,0.0017651443],"category_scores_gemma":[0.0008365697,0.0002781471,0.000395602,0.00051087234,0.00036638096,0.000909227,0.00052879454,0.00040823125,0.00018279313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015153948,0.000050998828,0.00083858264,0.000034512366,0.000016452603,0.00010043074,0.00006652795,0.9640663,0.0063716327,0.011533333,0.00041321365,0.016356586],"study_design_scores_gemma":[0.000007673119,0.00005199446,0.0007298495,0.00000555978,0.000007987772,0.000023310935,0.00004327334,0.9930727,0.0015586264,0.0039260653,0.0005627175,0.000010352169],"about_ca_topic_score_codex":0.00219049,"about_ca_topic_score_gemma":0.004694699,"teacher_disagreement_score":0.00219049,"about_ca_system_score_codex":0.0006850525,"about_ca_system_score_gemma":0.00060364173,"threshold_uncertainty_score":0.0059049726},"labels":[],"label_agreement":null},{"id":"W3118439948","doi":"10.1007/s12273-020-0751-x","title":"Evaluating the impact of thermostat control strategies on the energy flexibility of residential buildings for space heating","year":2021,"lang":"en","type":"article","venue":"Building Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Thermostat; Flexibility (engineering); Demand response; Smart grid; Model predictive control; Thermal comfort; Context (archaeology); Efficient energy use; Control (management); Grid; Architectural engineering; Engineering; Automotive engineering; Building management system; Computer science; Simulation; Electricity; Mechanical engineering; Electrical engineering","score_opus":0.0480055152506412,"score_gpt":0.35910302719567255,"score_spread":0.3110975119450313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118439948","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99295324,0.000057880614,0.002984878,0.00006763974,0.000015322963,0.000023731443,0.00013226546,0.00004632715,0.0037188595],"genre_scores_gemma":[0.9991659,0.00001580792,0.00043683423,0.0000050259873,0.0000013278265,0.000006517199,0.000037961974,0.0000042098272,0.00032646605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998235,0.00007405706,0.0000065728627,0.000020256502,0.000024775984,0.000050891587],"domain_scores_gemma":[0.9986577,0.0010333932,0.00007108838,0.000057301277,0.00009939011,0.000081122475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005442337,0.0006258985,0.0005059313,0.00035897217,0.0003378567,0.0006364839,0.0005059427,0.00076015975,0.0028583098],"category_scores_gemma":[0.0018316931,0.00031057853,0.0005070978,0.00036208247,0.00037492963,0.00058442954,0.00037912602,0.00071166933,0.00015051028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022697047,0.00013325205,0.0013331033,0.000021124553,0.000014251419,0.000020101133,0.000010732072,0.9950582,0.0010420508,0.00028606836,0.00007728941,0.0017768735],"study_design_scores_gemma":[0.000026407084,0.00018698651,0.0012154862,0.0000025772313,0.000013405081,0.0000035876985,0.00003059381,0.9969658,0.0013336072,0.00014382547,0.00007274124,0.000004924568],"about_ca_topic_score_codex":0.024508897,"about_ca_topic_score_gemma":0.019176656,"teacher_disagreement_score":0.024508897,"about_ca_system_score_codex":0.00085743197,"about_ca_system_score_gemma":0.0007477055,"threshold_uncertainty_score":0.04873246},"labels":[],"label_agreement":null},{"id":"W3119463227","doi":"10.2514/6.2021-0626","title":"A Wholistic Approach to Human-in-the-Loop Ecosystem","year":2021,"lang":"en","type":"article","venue":"AIAA Scitech 2021 Forum","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Context (archaeology); Data science; Analytics; Big data; Space exploration; Resilience (materials science); Computer science; Paradigm shift; Curiosity; Space (punctuation); Psychology; Engineering; Geography","score_opus":0.014224397227146543,"score_gpt":0.2204129625991477,"score_spread":0.20618856537200114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119463227","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005769116,0.0067560333,0.27286705,0.1162454,0.004615372,0.00032457302,0.00053929246,0.00096136896,0.5919218],"genre_scores_gemma":[0.5743358,0.015984686,0.13447385,0.02116558,0.005243049,0.0012602088,0.0006275413,0.0007887407,0.24612047],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99878913,0.0005513967,0.000034794648,0.00023675119,0.00024379707,0.0001441637],"domain_scores_gemma":[0.9981857,0.0007367764,0.00011845869,0.00028521428,0.00030740857,0.00036647602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031700234,0.00081001484,0.00034103307,0.0015249155,0.0028738761,0.011804546,0.0022815631,0.0044068065,0.043859806],"category_scores_gemma":[0.0039786496,0.00033733915,0.0005163653,0.0010513513,0.010883539,0.00921447,0.0062146536,0.0042724293,0.0065107862],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000188787,0.000031951233,0.00056686706,0.00014460391,0.000010458931,0.00014227394,0.0014580499,0.001730523,0.00029504596,0.93794096,0.027360652,0.03029979],"study_design_scores_gemma":[0.000009619632,0.000039448463,0.0003512759,0.00028422134,0.000008594559,0.00015383765,0.0026010862,0.0040522246,0.0002289426,0.54874337,0.44351035,0.000017006925],"about_ca_topic_score_codex":0.003359446,"about_ca_topic_score_gemma":0.0035388279,"teacher_disagreement_score":0.043859806,"about_ca_system_score_codex":0.0035202908,"about_ca_system_score_gemma":0.0037970846,"threshold_uncertainty_score":0.14672565},"labels":[],"label_agreement":null},{"id":"W3120155590","doi":"10.1109/icue49301.2020.9307089","title":"Comprehensive Analysis of Convolutional Neural Network Models for Non-Instructive Load Monitoring","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Convolutional neural network; Sequence (biology); Data mining; Artificial intelligence; Association (psychology); Machine learning; Artificial neural network; Point (geometry); Precision and recall; Energy consumption; Recall; Energy (signal processing); Pattern recognition (psychology); Engineering; Statistics","score_opus":0.030168800658498578,"score_gpt":0.22641238400601646,"score_spread":0.19624358334751787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120155590","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55092454,0.0072894194,0.4272467,0.000785287,0.00013823081,0.00012399076,0.0013127225,0.001797984,0.010381199],"genre_scores_gemma":[0.96538734,0.0015240216,0.028004438,0.000054861295,0.000028152675,0.000058423168,0.0014243529,0.0000557965,0.0034624622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974066,0.000058729125,0.000019862948,0.000046657035,0.000090659036,0.000043394433],"domain_scores_gemma":[0.9989742,0.00058642006,0.00007922675,0.0000697246,0.0002716643,0.000018781304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014271969,0.0009123416,0.00041499166,0.0008439626,0.00019954868,0.00056929304,0.00058892666,0.00045379068,0.0011459778],"category_scores_gemma":[0.0031643468,0.00026188503,0.00054077903,0.00052677427,0.00015835768,0.00087234424,0.00029313966,0.0005166558,0.0002446416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089082,0.00005301189,0.0036757214,0.00011898897,0.00010411633,0.00007068808,0.000024386667,0.92083853,0.0022019777,0.0028267642,0.0009596061,0.069037184],"study_design_scores_gemma":[8.398329e-7,0.000017143959,0.0007585157,0.000007414303,0.000012748999,0.000007402695,0.0000032438886,0.9978898,0.0006956384,0.00040813163,0.00019645125,0.0000026643092],"about_ca_topic_score_codex":0.021867838,"about_ca_topic_score_gemma":0.020664334,"teacher_disagreement_score":0.021867838,"about_ca_system_score_codex":0.0013341513,"about_ca_system_score_gemma":0.0008542642,"threshold_uncertainty_score":0.04348111},"labels":[],"label_agreement":null},{"id":"W3121097856","doi":"10.1109/tia.2020.3048643","title":"Stochastic Optimization for Residential Demand Response With Unit Commitment and Time of Use","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"University of Regina","keywords":"Demand response; Flexibility (engineering); Computer science; Power system simulation; Electricity; Environmental economics; Mathematical optimization; Load profile; Pareto principle; Operations research; Electricity generation; Electricity pricing; Load management; Electricity market; Electric power system; Power (physics); Economics; Engineering","score_opus":0.022983368463247816,"score_gpt":0.22461572558633464,"score_spread":0.20163235712308683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121097856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042712156,0.00069867325,0.94167125,0.0009875506,0.00015720786,0.00012069153,0.0004120496,0.00031700396,0.01292343],"genre_scores_gemma":[0.9482197,0.00055104826,0.037935276,0.00020238619,0.000061020266,0.00030129787,0.0003843585,0.00012803546,0.012216781],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840754,0.0008203371,0.000046339388,0.00023133509,0.00028118232,0.00021338942],"domain_scores_gemma":[0.9982609,0.0011566341,0.0002137436,0.00006936863,0.0002113733,0.00008804756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021414193,0.0015831355,0.0014123309,0.00050420087,0.00043791367,0.0013836952,0.0011753343,0.0013206814,0.004526152],"category_scores_gemma":[0.004224643,0.0009259428,0.0012219697,0.0010579666,0.0008337462,0.0010326904,0.0011532068,0.0020980593,0.00047923237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027651393,0.000014588557,0.0001067311,0.000019635674,0.000017826422,0.000023166042,0.000009880304,0.99104905,0.00012907606,0.006603125,0.00033261275,0.0016665861],"study_design_scores_gemma":[0.0000034245013,0.0000061585433,0.000034572884,0.0000013873179,0.0000021774474,0.0000018564524,0.0000036159663,0.99816114,0.000024556723,0.0016384566,0.00012048022,0.0000022259144],"about_ca_topic_score_codex":0.0144078545,"about_ca_topic_score_gemma":0.010374622,"teacher_disagreement_score":0.0144078545,"about_ca_system_score_codex":0.0018197325,"about_ca_system_score_gemma":0.0015638354,"threshold_uncertainty_score":0.02864796},"labels":[],"label_agreement":null},{"id":"W3121266184","doi":"","title":"Distributed Energy Resources: New Markets and New Products","year":2017,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Distributed generation; Order (exchange); Marginal value; Industrial organization; Marginal cost; Core (optical fiber); Electric power; Service (business); Market power; Reliability (semiconductor); Microeconomics; Electric energy; Control (management); Economics; Power (physics); Business; Computer science; Engineering; Renewable energy; Economy; Electrical engineering; Telecommunications; Monopoly; Finance","score_opus":0.007935227029789958,"score_gpt":0.1911972932520101,"score_spread":0.18326206622222013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121266184","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034922443,0.08909506,0.3508307,0.055943865,0.004498683,0.00013858028,0.00030753415,0.000612567,0.46365055],"genre_scores_gemma":[0.5886125,0.08571142,0.16842069,0.006315239,0.006789586,0.00027916857,0.00028071675,0.00042193817,0.14316878],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989293,0.0002328639,0.00004265867,0.0001645684,0.0005677033,0.0000629487],"domain_scores_gemma":[0.99914,0.0003234824,0.000091578564,0.00017831156,0.00019016243,0.00007638915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015328812,0.0004675551,0.00055534864,0.0009975325,0.00064431224,0.005877632,0.0012242356,0.0018989478,0.010922611],"category_scores_gemma":[0.0022207175,0.00032270775,0.00050214067,0.0013667556,0.004701089,0.016575743,0.002250772,0.002846022,0.0018524483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011047476,0.000012282062,0.000069662296,0.00007521143,0.0000032271755,0.0000817009,0.0000711689,0.0011468035,0.00026391412,0.9630219,0.0034132253,0.03182982],"study_design_scores_gemma":[0.000011011083,0.000031749943,0.00013623333,0.00013588544,0.0000046306977,0.00034562667,0.00020058811,0.004914332,0.00041699718,0.7456035,0.24818426,0.0000151862105],"about_ca_topic_score_codex":0.00047711036,"about_ca_topic_score_gemma":0.0005977266,"teacher_disagreement_score":0.010922611,"about_ca_system_score_codex":0.0019344821,"about_ca_system_score_gemma":0.0009461458,"threshold_uncertainty_score":0.036539793},"labels":[],"label_agreement":null},{"id":"W3122796355","doi":"10.5013/ijssst.a.17.41.01","title":"The Impact of Distributed Energy Storage on Total Operation Cost in Power","year":2016,"lang":"en","type":"article","venue":"International Journal of Simulation Systems Science & Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Energy storage; Power (physics); Distributed generation; Energy (signal processing); Environmental science; Computer science; Reliability engineering; Engineering; Physics; Mathematics; Statistics; Thermodynamics","score_opus":0.008512683083250646,"score_gpt":0.2739029302199755,"score_spread":0.2653902471367249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122796355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97509104,0.0005611404,0.009321688,0.00066614716,0.00007697466,0.000017847724,0.00064646587,0.00011042779,0.013508237],"genre_scores_gemma":[0.9988018,0.00004172234,0.00033547712,0.000007971837,0.0000032712921,0.000002379489,0.000057001307,0.000013816159,0.00073671003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994992,0.00016694267,0.000023277942,0.000045775847,0.00015787133,0.00010697982],"domain_scores_gemma":[0.99257904,0.0058772303,0.00022879496,0.00027544933,0.00086627575,0.00017319518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011071988,0.00037971037,0.0004834535,0.000480414,0.00036203518,0.0013465853,0.00059205305,0.00053049007,0.0057225525],"category_scores_gemma":[0.0076228115,0.00025111495,0.00041945372,0.0010179994,0.0003600952,0.002151798,0.00038574077,0.00061956194,0.00024720907],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015019467,0.00018379968,0.010879138,0.00008557406,0.00006484144,0.00020915989,0.000031220465,0.94847697,0.0020086945,0.007587431,0.0014302185,0.027541002],"study_design_scores_gemma":[0.000037968603,0.00026449782,0.01441776,0.00001513157,0.00010474284,0.000109969784,0.00016619707,0.975743,0.003372984,0.0051681935,0.0005761518,0.000023348028],"about_ca_topic_score_codex":0.0086078085,"about_ca_topic_score_gemma":0.011456581,"teacher_disagreement_score":0.0086078085,"about_ca_system_score_codex":0.0016592914,"about_ca_system_score_gemma":0.00089090597,"threshold_uncertainty_score":0.01914382},"labels":[],"label_agreement":null},{"id":"W3123374022","doi":"","title":"On The Benefits of Behind-the-Meter Rooftop Solar and Energy Storage: The Importance of Retail Rate Design","year":2018,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Investment (military); Peak demand; Battery storage; Environmental economics; Economics; Microeconomics; Natural resource economics; Battery (electricity); Business; Electricity; Agricultural economics; Engineering; Electrical engineering","score_opus":0.035219212911420106,"score_gpt":0.2464097545611465,"score_spread":0.2111905416497264,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123374022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9064259,0.0010902111,0.02210946,0.0019928096,0.000076080374,0.00007901501,0.0002008927,0.000052718835,0.06797305],"genre_scores_gemma":[0.9965431,0.00023242421,0.0017470261,0.000083391584,0.000015578136,0.000008904344,0.000022620123,0.000009368848,0.0013376002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992957,0.00032335854,0.00001833898,0.000083582054,0.00013301398,0.00014591601],"domain_scores_gemma":[0.99541926,0.0031150577,0.0006391198,0.00028548963,0.00038532264,0.00015579432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014477533,0.00036311726,0.0004062653,0.00030736774,0.00045390383,0.0018973878,0.0008551254,0.00083530636,0.006162365],"category_scores_gemma":[0.00703584,0.00023873193,0.00045161555,0.00050769077,0.0009907845,0.0020639796,0.0009428504,0.001080164,0.00021283985],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014195067,0.00083807553,0.047179334,0.00036698944,0.00017514959,0.0004956336,0.00035444615,0.52795637,0.008047965,0.3124405,0.00474052,0.09598561],"study_design_scores_gemma":[0.00030643496,0.0025883084,0.10294965,0.00028732483,0.0006458256,0.00046474705,0.0034095643,0.6447678,0.014718635,0.2037272,0.025926838,0.00020765257],"about_ca_topic_score_codex":0.006351663,"about_ca_topic_score_gemma":0.01080809,"teacher_disagreement_score":0.006351663,"about_ca_system_score_codex":0.0020584594,"about_ca_system_score_gemma":0.00096042885,"threshold_uncertainty_score":0.02061522},"labels":[],"label_agreement":null},{"id":"W3123422205","doi":"10.1016/j.eneco.2017.05.010","title":"A two-part feed-in-tariff for intermittent electricity generation","year":2017,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tariff; Economics; Electricity; Feed-in tariff; Complementarity (molecular biology); Wind power; Microeconomics; Electricity generation; Renewable energy; Environmental economics; Econometrics; Natural resource economics; Energy policy; International economics; Power (physics); Engineering","score_opus":0.01953039547812931,"score_gpt":0.21260261271211844,"score_spread":0.19307221723398912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123422205","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109826736,0.00035867302,0.7472877,0.0013984375,0.0010539801,0.0018816894,0.0010699027,0.0017254959,0.13539739],"genre_scores_gemma":[0.81520146,0.00017441387,0.1415021,0.00036847926,0.00017772737,0.00038732254,0.0004777771,0.00022258401,0.04148811],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981483,0.0005736621,0.000075102274,0.00018806849,0.0007584648,0.00025644945],"domain_scores_gemma":[0.99862707,0.00046781427,0.00006514054,0.00032126566,0.00039883316,0.00011999842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028665576,0.00074440445,0.0011343635,0.0013481952,0.0016337049,0.002663612,0.0029876388,0.002731167,0.027059201],"category_scores_gemma":[0.004152194,0.0005772835,0.0015786227,0.0011827529,0.00067333714,0.0023508607,0.0015305621,0.0024777139,0.0028503013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022138993,0.0017662969,0.0023654513,0.00047863566,0.00018040056,0.0006710298,0.0001780746,0.19356653,0.014957561,0.37497422,0.028922314,0.37972555],"study_design_scores_gemma":[0.000620325,0.0015142461,0.003322985,0.000124949,0.0002316942,0.00079008774,0.00017597359,0.83840346,0.009753096,0.10073366,0.044149235,0.000180273],"about_ca_topic_score_codex":0.0036521412,"about_ca_topic_score_gemma":0.008033917,"teacher_disagreement_score":0.027059201,"about_ca_system_score_codex":0.0019113399,"about_ca_system_score_gemma":0.0033200728,"threshold_uncertainty_score":0.09052205},"labels":[],"label_agreement":null},{"id":"W3124725983","doi":"","title":"Electricity demand response in Japan:Experimental evidence from a residential photovoltaic generation system","year":2015,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Electricity; Quarter (Canadian coin); Electricity generation; Environmental economics; Demand response; Electricity demand; Electricity pricing; Business; Economics; Agricultural economics; Environmental science; Power (physics); Electricity market; Engineering; Geography; Electrical engineering","score_opus":0.04240975616456783,"score_gpt":0.2938895013027891,"score_spread":0.2514797451382213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124725983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9959877,0.00044495723,0.00085435127,0.00026504937,0.00012324753,0.0012932863,0.00020471175,0.000022156823,0.00080455904],"genre_scores_gemma":[0.9942274,0.00051337964,0.0017577946,0.0003926006,0.00014807754,0.0020396484,0.00025199127,0.000010326438,0.0006588909],"study_design_codex":"randomized_trial","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9892876,0.0086384555,0.000599134,0.0005971503,0.00043275623,0.0004449164],"domain_scores_gemma":[0.9797744,0.01256443,0.0038221222,0.002022241,0.0009384642,0.00087837916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008705637,0.00097402115,0.0014308855,0.00030192235,0.0008009918,0.0006934141,0.0008842077,0.0013549551,0.0036965953],"category_scores_gemma":[0.01797609,0.00053402537,0.0016222355,0.0005203263,0.0022933173,0.0008091805,0.0005648354,0.0017358052,0.00039863543],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.55904424,0.33902168,0.010889851,0.0046337503,0.0047853915,0.0003213572,0.0014686345,0.0040142904,0.0136254765,0.0009642321,0.0025326347,0.058698326],"study_design_scores_gemma":[0.23926473,0.71676594,0.027278222,0.00018331484,0.0034756458,0.00009500659,0.0005953596,0.0040038847,0.005171077,0.0011804432,0.0018843686,0.00010199818],"about_ca_topic_score_codex":0.0045863907,"about_ca_topic_score_gemma":0.004250004,"teacher_disagreement_score":0.008705637,"about_ca_system_score_codex":0.001050679,"about_ca_system_score_gemma":0.0019469573,"threshold_uncertainty_score":0.046040356},"labels":[],"label_agreement":null},{"id":"W3124745613","doi":"","title":"On the Role of Maximum Demand Charges in the Presence of Distributed Generation Resources","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Welfare; Electricity; Demand response; Distributed generation; Business; Economics; Microeconomics; Environmental economics; Market economy; Engineering; Electrical engineering","score_opus":0.018867865087767617,"score_gpt":0.24312205622753924,"score_spread":0.22425419113977163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124745613","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59803957,0.0066128094,0.18597826,0.03895195,0.0014498029,0.00019363509,0.00073508185,0.00036506535,0.16767386],"genre_scores_gemma":[0.99514705,0.0007717725,0.0014063625,0.00040387287,0.00018858904,0.000014954909,0.000030061623,0.000022533073,0.00201479],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979741,0.0010387233,0.000055458167,0.00019193863,0.00020459214,0.0005351659],"domain_scores_gemma":[0.95673877,0.03719683,0.002798533,0.00088825385,0.0013340362,0.0010435445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00594016,0.0009887188,0.0015045619,0.0009053901,0.0013053997,0.0047243563,0.0023957815,0.0035071878,0.0129400445],"category_scores_gemma":[0.040431652,0.00058561726,0.0010793915,0.0008019915,0.0036376126,0.007513759,0.002941737,0.0047459905,0.00043081102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054158,0.00022985344,0.0052871834,0.00036790108,0.00012612935,0.0013544797,0.0002866933,0.23303117,0.002101746,0.72852033,0.009676832,0.018476037],"study_design_scores_gemma":[0.00017974168,0.00029161084,0.0032482436,0.0001918659,0.00014668268,0.0005694251,0.0009786896,0.30221313,0.001108821,0.6858954,0.005065666,0.00011087595],"about_ca_topic_score_codex":0.004238513,"about_ca_topic_score_gemma":0.0033265026,"teacher_disagreement_score":0.0129400445,"about_ca_system_score_codex":0.0021765935,"about_ca_system_score_gemma":0.0016017387,"threshold_uncertainty_score":0.043288767},"labels":[],"label_agreement":null},{"id":"W3124895992","doi":"","title":"Optimal Policies to Promote Efficient Distributed Generation of Electricity","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Distributed generation; Electricity; Production (economics); Investment (military); Net metering; Metering mode; Electricity generation; Payment; Set (abstract data type); Environmental economics; Business; Computer science; Economics; Microeconomics; Engineering; Renewable energy; Electrical engineering; Power (physics); Finance","score_opus":0.025427642031545804,"score_gpt":0.27555391802698426,"score_spread":0.25012627599543846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124895992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10145572,0.0021499733,0.8457342,0.00524763,0.00037116496,0.00027589375,0.0004490899,0.0004766766,0.04383976],"genre_scores_gemma":[0.95559114,0.0014328691,0.035886202,0.0004333855,0.0001554753,0.0002136754,0.00009215235,0.0001017229,0.0060933563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851376,0.00073092844,0.000048946138,0.00025267035,0.00017668527,0.00027706692],"domain_scores_gemma":[0.99313253,0.005082692,0.0008318591,0.00021418624,0.00042390637,0.00031481896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002643899,0.0016147139,0.0014869445,0.0008222743,0.00040692964,0.0023011083,0.0008234806,0.0020386628,0.005166846],"category_scores_gemma":[0.014180496,0.00093223574,0.0006116171,0.00066262385,0.00158314,0.002249865,0.0013614136,0.0017491807,0.0006040207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021914559,0.00017673499,0.0005041236,0.00022833327,0.00008895128,0.000098339035,0.00006477271,0.84169143,0.0018990275,0.13946682,0.0039056705,0.011656765],"study_design_scores_gemma":[0.00021969512,0.00012193964,0.00023292497,0.00005904883,0.00004145545,0.00002877791,0.00003771463,0.86779875,0.000812277,0.12832746,0.0022997763,0.000020208801],"about_ca_topic_score_codex":0.0015435083,"about_ca_topic_score_gemma":0.0010138222,"teacher_disagreement_score":0.005166846,"about_ca_system_score_codex":0.0021831796,"about_ca_system_score_gemma":0.0019736607,"threshold_uncertainty_score":0.01728487},"labels":[],"label_agreement":null},{"id":"W3125500893","doi":"","title":"Building-Integrated Photovoltaics: Distributed Energy Development for Urban Sustainability","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Toronto; Carleton University","funders":"","keywords":"Photovoltaics; Sustainability; Photovoltaic system; Energy development; Environmental economics; Business; Environmental science; Architectural engineering; Natural resource economics; Environmental planning; Renewable energy; Engineering; Economics; Electrical engineering","score_opus":0.0051131586417623425,"score_gpt":0.1962683724760454,"score_spread":0.19115521383428305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125500893","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13597511,0.031684812,0.4078126,0.008398083,0.0016918367,0.00009374774,0.0005554629,0.0020235102,0.41176477],"genre_scores_gemma":[0.8728807,0.013053766,0.031546704,0.00041934,0.00045985097,0.00003106939,0.00031115336,0.00014238074,0.081155084],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998822,0.000023813009,0.0000026960972,0.000020348036,0.000056892615,0.000014046969],"domain_scores_gemma":[0.99993086,0.000014260355,0.0000061331907,0.000014733345,0.00002662877,0.0000074684253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021336591,0.0002469881,0.000169083,0.00026135996,0.00022206166,0.00095400924,0.000388932,0.0004621921,0.00566353],"category_scores_gemma":[0.0002236009,0.000107901295,0.00014782451,0.0011666178,0.00034113176,0.0010103908,0.00061063044,0.000492142,0.0009595325],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010531072,0.00020481535,0.0024210773,0.00033323595,0.000050912215,0.000095763506,0.000110969115,0.019123457,0.029321374,0.18115643,0.020318823,0.74675786],"study_design_scores_gemma":[0.00005981385,0.0003886561,0.009450912,0.00015874105,0.00013224928,0.0007713131,0.00042473775,0.0754319,0.07926879,0.16576241,0.6681105,0.00004001571],"about_ca_topic_score_codex":0.00060165126,"about_ca_topic_score_gemma":0.0021036442,"teacher_disagreement_score":0.00566353,"about_ca_system_score_codex":0.00039061968,"about_ca_system_score_gemma":0.00032453175,"threshold_uncertainty_score":0.018946469},"labels":[],"label_agreement":null},{"id":"W3125552895","doi":"10.1007/978-981-15-8677-4_4","title":"Smart Electrification of Rural Bangladesh Through Smart Grids","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes on data engineering and communications technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Renewable energy; Electrification; Electric power system; Rural electrification; Engineering; Electricity generation; Electricity; Distributed generation; Grid; Computer science; Environmental economics; Architectural engineering; Power (physics); Electrical engineering; Geography","score_opus":0.027815352780969048,"score_gpt":0.22795789652480344,"score_spread":0.2001425437438344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125552895","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10797731,0.0051032016,0.007609617,0.008950135,0.00030728,0.00009422745,0.0008705846,0.00023245843,0.86885506],"genre_scores_gemma":[0.6654378,0.0120033,0.0025843082,0.0004133434,0.00006828571,0.000054928383,0.00036115255,0.000046111898,0.31903073],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99997246,0.0000068641243,0.0000012642798,0.0000034229636,0.000009225307,0.0000067460187],"domain_scores_gemma":[0.9999734,0.000006780746,0.0000037387495,0.0000033843014,0.000006984231,0.00000571597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006858376,0.00026552,0.000077046556,0.0002299189,0.0003440793,0.00080254424,0.00017225115,0.00022267184,0.009502878],"category_scores_gemma":[0.000116000396,0.000076353914,0.00006520036,0.0007489723,0.0003436615,0.00059076166,0.00041351258,0.00035030115,0.0013119483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013456262,0.00007810513,0.00848624,0.0007471781,0.000021255983,0.0021990892,0.0038251248,0.019395325,0.01791529,0.33965716,0.13333717,0.47420356],"study_design_scores_gemma":[0.000015735537,0.00010822961,0.009055989,0.0002143541,0.000011374141,0.0005466911,0.006161141,0.0041585607,0.0035273728,0.03537997,0.9407979,0.000022620312],"about_ca_topic_score_codex":0.009901373,"about_ca_topic_score_gemma":0.027556242,"teacher_disagreement_score":0.009901373,"about_ca_system_score_codex":0.00089711626,"about_ca_system_score_gemma":0.00091585936,"threshold_uncertainty_score":0.031790316},"labels":[],"label_agreement":null},{"id":"W3127943096","doi":"10.1016/j.segan.2021.100448","title":"Optimal participation of a virtual power plant in electricity market considering renewable energy: A deep learning-based approach","year":2021,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Virtual power plant; Renewable energy; Bidding; Computer science; Electricity market; Electricity; Profit (economics); Time horizon; Electric power system; Wind power; Spinning; Environmental economics; Reliability engineering; Simulation; Mathematical optimization; Power (physics); Engineering; Distributed generation; Electrical engineering; Economics; Microeconomics; Mathematics; Mechanical engineering","score_opus":0.003995874469820913,"score_gpt":0.17517071892592267,"score_spread":0.17117484445610176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127943096","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3647718,0.0003789021,0.617135,0.0019762153,0.00016333003,0.00010154738,0.00018795909,0.00022705451,0.015058182],"genre_scores_gemma":[0.99173063,0.000037905207,0.005969742,0.00005467957,0.00002432225,0.000020702353,0.00003346466,0.000017089535,0.0021114415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940634,0.00022488953,0.000014819076,0.00012101629,0.000059316964,0.00017369137],"domain_scores_gemma":[0.9977683,0.0015084977,0.00017734597,0.00005653245,0.00018445127,0.00030486807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015794601,0.0007516469,0.0017249944,0.000460865,0.00053073384,0.0017106868,0.0017338499,0.0026294207,0.0053292443],"category_scores_gemma":[0.0044432976,0.0008018635,0.00060739217,0.00041758022,0.0011913463,0.0022487019,0.0014373652,0.0015892166,0.00024886162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013660602,0.0000797135,0.00046178632,0.000026288928,0.000017046505,0.00007987315,0.000017990176,0.9888732,0.000353021,0.005419761,0.00038285367,0.004151777],"study_design_scores_gemma":[0.0000042772886,0.000007849115,0.00003227628,0.0000012830777,0.0000020285106,0.0000026932412,0.0000045801517,0.9988287,0.00003380642,0.0010593791,0.000021817117,0.0000012478166],"about_ca_topic_score_codex":0.00798863,"about_ca_topic_score_gemma":0.008620571,"teacher_disagreement_score":0.00798863,"about_ca_system_score_codex":0.0010668387,"about_ca_system_score_gemma":0.00163069,"threshold_uncertainty_score":0.017828107},"labels":[],"label_agreement":null},{"id":"W3128219721","doi":"10.1109/epec48502.2020.9320042","title":"A Review of Recent Advances on Reinforcement Learning for Smart Home Energy Management","year":2020,"lang":"en","type":"review","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Home automation; Computer science; Smart grid; Energy management; Control (management); Risk analysis (engineering); Energy (signal processing); Artificial intelligence; Engineering; Telecommunications; Electrical engineering; Business","score_opus":0.019083074448305606,"score_gpt":0.2502024741589127,"score_spread":0.23111939971060713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128219721","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003052827,0.99242085,0.0031296476,0.0003848998,0.00044288707,0.0000117324735,0.00003363666,0.000041521555,0.0032295613],"genre_scores_gemma":[0.0027866047,0.99272716,0.0023105885,0.00026805548,0.000559937,0.000015309746,0.00007578624,0.000010120157,0.0012464377],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99969053,0.000048148162,0.000045667828,0.0000690948,0.00012233939,0.000024167095],"domain_scores_gemma":[0.9990219,0.00061863917,0.00008548819,0.00002932984,0.00020385989,0.000040800835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064675376,0.0010912857,0.0011451107,0.0019498179,0.00024057864,0.0009824894,0.000865106,0.0010539471,0.005259555],"category_scores_gemma":[0.0017317077,0.0004364702,0.0006761914,0.0032642796,0.0003407071,0.0016215228,0.0005993873,0.0013630794,0.0027213646],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052421663,0.00009543531,0.00026420312,0.01481885,0.00007664158,0.00011323921,0.0000668047,0.0028803349,0.0011063729,0.00778917,0.027371055,0.9453655],"study_design_scores_gemma":[0.000018867919,0.00019730903,0.0009396844,0.0049045957,0.00018733705,0.00065688154,0.000081381055,0.0022876202,0.00081469194,0.0061408123,0.9837198,0.000050987514],"about_ca_topic_score_codex":0.0013059973,"about_ca_topic_score_gemma":0.0012958044,"teacher_disagreement_score":0.005259555,"about_ca_system_score_codex":0.00052292814,"about_ca_system_score_gemma":0.0009562679,"threshold_uncertainty_score":0.017594934},"labels":[],"label_agreement":null},{"id":"W3128303448","doi":"10.1109/epec48502.2020.9320051","title":"Representative Profiling of Prosumers with Local Distributed Energy Resources and Electric Vehicles Using Unsupervised Machine Learning","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Granularity; Cluster analysis; Computer science; Distributed generation; Unsupervised learning; Principal component analysis; Photovoltaic system; Data mining; k-nearest neighbors algorithm; Profiling (computer programming); Load profile; Artificial intelligence; Machine learning; Electricity; Engineering; Renewable energy","score_opus":0.010606157794810401,"score_gpt":0.1935928366485957,"score_spread":0.1829866788537853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128303448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8834033,0.0005135804,0.10422928,0.00023917941,0.000081249054,0.00014207663,0.0064299507,0.00045032357,0.0045110183],"genre_scores_gemma":[0.9735562,0.0001486737,0.017326053,0.000042348165,0.000023257033,0.00004634733,0.0076520042,0.000018987377,0.0011862342],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954766,0.00010542525,0.000034385837,0.00013385375,0.00009837863,0.000080225254],"domain_scores_gemma":[0.9994603,0.00015896473,0.00009115857,0.00010378359,0.00014411467,0.0000417188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047432882,0.0005090784,0.0005974481,0.0011006009,0.00025013214,0.00063949544,0.00057075074,0.00040040357,0.0006863392],"category_scores_gemma":[0.0016783448,0.00014806405,0.0004506226,0.0015765317,0.00014267748,0.00080937333,0.0004794633,0.00038791317,0.0004623955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009494098,0.0007440116,0.38397273,0.00035133524,0.00050518947,0.0013743602,0.0004650771,0.30278072,0.010623641,0.0046560145,0.0126689635,0.28090858],"study_design_scores_gemma":[0.0000140134125,0.00013166599,0.082296364,0.000030190615,0.000051714993,0.00043545544,0.00052415236,0.9031487,0.004130025,0.0038584603,0.005346303,0.00003291333],"about_ca_topic_score_codex":0.0041459347,"about_ca_topic_score_gemma":0.007359911,"teacher_disagreement_score":0.0041459347,"about_ca_system_score_codex":0.0003392536,"about_ca_system_score_gemma":0.00027766012,"threshold_uncertainty_score":0.008243561},"labels":[],"label_agreement":null},{"id":"W3128558301","doi":"10.1109/epec48502.2020.9320090","title":"Demand Side Management using Model-Free Fuzzy Controller in a Direct Load Control Program","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Siemens","keywords":"Thermostat; Controller (irrigation); Computer science; Control theory (sociology); Electric power system; Demand response; Load management; Control engineering; Operator (biology); Load profile; Fuzzy logic; Grid; Load following power plant; Power (physics); Base load power plant; Control (management); Engineering; Electricity","score_opus":0.010820786656187461,"score_gpt":0.20111619839265044,"score_spread":0.19029541173646297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128558301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26558235,0.0002119697,0.7114413,0.00025918122,0.00015607323,0.0003475224,0.000090782174,0.0030816025,0.018829247],"genre_scores_gemma":[0.9733704,0.000032755346,0.024447676,0.0000398023,0.00000992315,0.00008472851,0.000023734514,0.000015514788,0.001975453],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997389,0.00003849883,0.000014670624,0.00007441213,0.00009218451,0.000041289397],"domain_scores_gemma":[0.99972135,0.000090014255,0.000040958883,0.000032334654,0.00009521664,0.000020032709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004192021,0.00050454296,0.00043983813,0.00025386747,0.0005508767,0.00080976094,0.0007498472,0.000492448,0.002036298],"category_scores_gemma":[0.0006317586,0.0002748692,0.00032763957,0.00013589009,0.00037658113,0.0003798791,0.00044381074,0.00056258065,0.00032964887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007474039,0.00067258335,0.0017093542,0.00022652479,0.000077597324,0.0003519755,0.0003056267,0.78951275,0.06048995,0.004067308,0.0018101862,0.14002872],"study_design_scores_gemma":[0.000048793045,0.00017714503,0.00031365754,0.0000064278665,0.0000151322565,0.000023048158,0.000010409643,0.9918968,0.0065326323,0.00032171,0.00064283726,0.00001144967],"about_ca_topic_score_codex":0.009236952,"about_ca_topic_score_gemma":0.010745219,"teacher_disagreement_score":0.009236952,"about_ca_system_score_codex":0.00053352804,"about_ca_system_score_gemma":0.0007103156,"threshold_uncertainty_score":0.018366396},"labels":[],"label_agreement":null},{"id":"W3128711752","doi":"10.4018/jgim.2021030109","title":"Modeling Residential Energy Consumption","year":2021,"lang":"en","type":"article","venue":"Journal of Global Information Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"University of Warwick","keywords":"Electricity; Consumption (sociology); Energy consumption; Environmental economics; Energy management; Computer science; Service (business); Analytics; Consumer behaviour; Energy (signal processing); Business; Marketing; Data science; Economics; Statistics","score_opus":0.009015688599354055,"score_gpt":0.21496034064410682,"score_spread":0.20594465204475276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128711752","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56732696,0.000649191,0.36993232,0.0013832783,0.00009110275,0.00016705382,0.0052193822,0.0010766444,0.054154024],"genre_scores_gemma":[0.9539714,0.0003727184,0.02920877,0.000061291714,0.000024001445,0.000095390664,0.0017255326,0.00007529603,0.014465755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979764,0.00006694908,0.000009811157,0.00006139404,0.000035422392,0.000028859924],"domain_scores_gemma":[0.9997129,0.00017005426,0.000028876968,0.00002867808,0.000044911365,0.000014648755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031567187,0.00045292595,0.00030329014,0.00042327342,0.00024808387,0.001047626,0.0006921293,0.000689959,0.0034250272],"category_scores_gemma":[0.0011848143,0.00032723096,0.0006526632,0.0010784571,0.00018782304,0.00082655536,0.0004278441,0.00054449396,0.00073250337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000399786,0.00009107157,0.007529451,0.00004054896,0.000036604157,0.000067290624,0.000097899254,0.96350145,0.0005264395,0.013163676,0.0014514917,0.01345409],"study_design_scores_gemma":[0.0000021047267,0.0000049498335,0.00078499195,0.000003606229,0.000003848359,0.000008174536,0.000026329857,0.99561656,0.00009157233,0.002389984,0.0010651904,0.0000027968829],"about_ca_topic_score_codex":0.03571623,"about_ca_topic_score_gemma":0.03696086,"teacher_disagreement_score":0.03571623,"about_ca_system_score_codex":0.0010482899,"about_ca_system_score_gemma":0.0007685917,"threshold_uncertainty_score":0.07101667},"labels":[],"label_agreement":null},{"id":"W3132337940","doi":"10.1016/j.ijepes.2020.106731","title":"Demand response integrated day-ahead energy management strategy for remote off-grid hybrid renewable energy systems","year":2021,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Demand response; Energy management; Intermittent energy source; Environmental economics; Computer science; Electric power system; Energy management system; Smart grid; Peak demand; Grid; Energy storage; Incentive; Reliability engineering; Distributed generation; Engineering; Energy (signal processing); Power (physics); Electricity; Electrical engineering; Economics","score_opus":0.009909350893998614,"score_gpt":0.22838828675813258,"score_spread":0.21847893586413397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132337940","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6641898,0.0008380058,0.2713098,0.0013912682,0.00033958675,0.00025173844,0.0005719435,0.0016079601,0.05949981],"genre_scores_gemma":[0.9968874,0.000023669114,0.0015134234,0.000035691508,0.0000113019605,0.000009436533,0.000049605474,0.000011960016,0.0014574328],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997713,0.000047544156,0.00001186666,0.000047307563,0.00006457704,0.00005734395],"domain_scores_gemma":[0.9997701,0.00005817286,0.000030517265,0.000016866452,0.00009560582,0.000028744782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031591242,0.0005636353,0.000727758,0.00029668232,0.00049837935,0.0010651564,0.00082670734,0.000495883,0.0043465854],"category_scores_gemma":[0.00036831232,0.00022672147,0.00026130615,0.00025554845,0.00015143969,0.0007492351,0.0005945876,0.0005094274,0.0005648128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012724402,0.000652679,0.0035881808,0.00019764225,0.00013520567,0.0004775741,0.00017328661,0.82716525,0.032036327,0.0057110847,0.008242276,0.12034805],"study_design_scores_gemma":[0.00002271623,0.00014014462,0.0013327178,0.0000044442104,0.000018072496,0.000045220968,0.00008265947,0.99452436,0.0018526501,0.0011358147,0.0008306577,0.000010460946],"about_ca_topic_score_codex":0.002985276,"about_ca_topic_score_gemma":0.006420548,"teacher_disagreement_score":0.0043465854,"about_ca_system_score_codex":0.00043242573,"about_ca_system_score_gemma":0.00039185552,"threshold_uncertainty_score":0.014540732},"labels":[],"label_agreement":null},{"id":"W3134120822","doi":"10.3390/en14051387","title":"A Methodology for the Enhancement of the Energy Flexibility and Contingency Response of a Building through Predictive Control of Passive and Active Storage","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; Concordia University","funders":"","keywords":"Setpoint; Thermal energy storage; Flexibility (engineering); Demand response; Peak demand; Thermal mass; Energy storage; Computer science; Load shifting; Smart grid; Automotive engineering; Reliability engineering; Energy management; Model predictive control; Simulation; Engineering; Energy (signal processing); Thermal; Electricity; Control (management); Electrical engineering; Power (physics)","score_opus":0.024924411233179938,"score_gpt":0.26721670881102877,"score_spread":0.24229229757784884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134120822","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014906559,0.00007782651,0.99663806,0.000021199701,0.0000135167165,0.000060133247,0.00001734009,0.00014582595,0.0015354815],"genre_scores_gemma":[0.48044407,0.0004460021,0.5150899,0.00003927954,0.000036284462,0.0006655331,0.000102998754,0.00005468752,0.0031212564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997621,0.000048759088,0.00001357241,0.0000510094,0.00010329419,0.000021234011],"domain_scores_gemma":[0.9998048,0.00007463045,0.00003973445,0.000022660248,0.000050508326,0.000007670363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056785723,0.0008717751,0.0004925308,0.00046904938,0.00029351105,0.00077948085,0.00087650184,0.00049155223,0.0025134927],"category_scores_gemma":[0.0006442128,0.00030224465,0.0006841913,0.0003481642,0.0004914039,0.00046535567,0.00041640954,0.000737235,0.00027033454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036469355,0.00007216871,0.00032101345,0.00033085103,0.000050864124,0.000111728055,0.00007041683,0.81283057,0.022811137,0.047615413,0.00059880223,0.11515062],"study_design_scores_gemma":[0.0000086618475,0.00012925878,0.00015131164,0.000024223164,0.000018927245,0.00005115003,0.000009582599,0.986652,0.0049269823,0.0055194083,0.0024960637,0.000012472656],"about_ca_topic_score_codex":0.0020524578,"about_ca_topic_score_gemma":0.0019604072,"teacher_disagreement_score":0.0025134927,"about_ca_system_score_codex":0.00052389904,"about_ca_system_score_gemma":0.0009458263,"threshold_uncertainty_score":0.008408487},"labels":[],"label_agreement":null},{"id":"W3134182014","doi":"10.1049/iet-gtd.2020.1113","title":"Two‐stage robust optimal scheduling of cooperative microgrids based on expected scenarios","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Mathematical optimization; Grid; Robust optimization; Renewable energy; Scheduling (production processes); Constraint (computer-aided design); Operations research; Engineering; Mathematics","score_opus":0.02489709971112645,"score_gpt":0.2258664783501438,"score_spread":0.20096937863901737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134182014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10583588,0.00019023201,0.8841366,0.00026709048,0.000051508356,0.00023038831,0.0001986181,0.00022641815,0.008863327],"genre_scores_gemma":[0.9758849,0.000081921935,0.021284452,0.000028726523,0.000010185713,0.000146732,0.00008604485,0.000020582693,0.0024563998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991579,0.00030038273,0.000029633737,0.00018401523,0.00012561526,0.00020234825],"domain_scores_gemma":[0.9992113,0.00037625505,0.00015320923,0.000040997922,0.00013686411,0.00008134894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001335923,0.0012974957,0.0012687214,0.00042362884,0.00047358876,0.0014312214,0.0014011574,0.0010067554,0.0026004086],"category_scores_gemma":[0.002071349,0.00078499014,0.00092747377,0.000478941,0.00073004403,0.0009930743,0.0011209933,0.001171707,0.00022039801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043731714,0.0000147967385,0.00010912569,0.000017483571,0.000010097949,0.00003823442,0.000015624417,0.9952217,0.00030430174,0.0024068898,0.00010711937,0.0017110045],"study_design_scores_gemma":[0.0000075040066,0.000024074274,0.00004325273,0.0000013501372,0.0000039511406,0.0000035836692,0.0000053088,0.9988851,0.000110144036,0.00085182505,0.000061183135,0.000002650741],"about_ca_topic_score_codex":0.010845026,"about_ca_topic_score_gemma":0.008224573,"teacher_disagreement_score":0.010845026,"about_ca_system_score_codex":0.0013387902,"about_ca_system_score_gemma":0.0019208695,"threshold_uncertainty_score":0.021563828},"labels":[],"label_agreement":null},{"id":"W3134694222","doi":"10.1109/access.2021.3061995","title":"Coordination of Smart Home Energy Management Systems in Neighborhood Areas: A Systematic Review","year":2021,"lang":"en","type":"review","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Computer science; Risk analysis (engineering); Smart grid; Grid; Process (computing); Electricity; Distributed computing; Process management; Business; Engineering","score_opus":0.027096490136148326,"score_gpt":0.28315624639910564,"score_spread":0.2560597562629573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134694222","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003763678,0.99834514,0.00038396742,0.0001297991,0.00006158748,0.000044988974,0.000057856745,0.0000056308695,0.0005946536],"genre_scores_gemma":[0.0036196122,0.9952726,0.0007523056,0.00009893048,0.000042955722,0.00004690639,0.00006760082,0.000002795834,0.00009647265],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99851507,0.00043201237,0.00041666016,0.00018134975,0.0003837315,0.00007113708],"domain_scores_gemma":[0.9934702,0.004885246,0.0007774408,0.00011596114,0.000650636,0.0001004236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025948132,0.0010176562,0.002329413,0.004718714,0.00039328943,0.0019166579,0.0013117285,0.0012333608,0.0036317965],"category_scores_gemma":[0.007983673,0.00057226804,0.0021771612,0.006117769,0.0005112535,0.0020395624,0.00085573556,0.00074255565,0.0004292784],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013990997,0.0000756032,0.0008715002,0.45068365,0.0011682375,0.00016514596,0.00032856668,0.0013034747,0.00036292963,0.004351965,0.0065589775,0.53399],"study_design_scores_gemma":[0.00010094414,0.00059921754,0.005159559,0.49341822,0.010070934,0.0011299405,0.0007441196,0.0010574998,0.00072227616,0.003374529,0.48353395,0.00008873526],"about_ca_topic_score_codex":0.0059312773,"about_ca_topic_score_gemma":0.010688104,"teacher_disagreement_score":0.0059312773,"about_ca_system_score_codex":0.0010872709,"about_ca_system_score_gemma":0.0074021555,"threshold_uncertainty_score":0.013722837},"labels":[],"label_agreement":null},{"id":"W3135033642","doi":"10.1109/picc51425.2020.9362420","title":"Demand Response and Energy Storage System Participation in North American Electricity Markets","year":2020,"lang":"en","type":"article","venue":"2020 International Conference on Power, Instrumentation, Control and Computing (PICC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Environmental economics; Demand response; Software deployment; Electricity; Renewable energy; Energy storage; Electric power system; Electricity market; Timeline; Business; Computer science; Power (physics); Engineering; Economics; Marketing; Electrical engineering","score_opus":0.008471396206406289,"score_gpt":0.22609280051903946,"score_spread":0.21762140431263316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135033642","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7514962,0.044121,0.0033656904,0.007315041,0.00013879959,0.0000592607,0.00074001704,0.000049486454,0.19271454],"genre_scores_gemma":[0.9771434,0.015399672,0.000741511,0.0005091657,0.00005659868,0.000018122106,0.00024513842,0.0000071882523,0.005879239],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971837,0.000077025725,0.000012542593,0.00003634446,0.0001034107,0.000052337815],"domain_scores_gemma":[0.9992674,0.00029518077,0.00015019644,0.000013814428,0.00020685265,0.00006655367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006620538,0.00010571185,0.000103175684,0.00072948175,0.00037789342,0.0012484322,0.00025510954,0.00027379396,0.0020375417],"category_scores_gemma":[0.0008619419,0.000065666274,0.00013575127,0.0016508807,0.0003315042,0.0008635206,0.00026331964,0.00030647177,0.000090915375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007023748,0.00038257224,0.15149072,0.0015917693,0.00014562478,0.0018209461,0.0063768704,0.019100541,0.004705185,0.156486,0.047161095,0.6100364],"study_design_scores_gemma":[0.00004405936,0.00025406526,0.46865815,0.0008930151,0.00014296542,0.0012422568,0.018168276,0.02119061,0.0035462405,0.02106461,0.4646679,0.00012778337],"about_ca_topic_score_codex":0.025369119,"about_ca_topic_score_gemma":0.07438141,"teacher_disagreement_score":0.025369119,"about_ca_system_score_codex":0.0014575357,"about_ca_system_score_gemma":0.0014208095,"threshold_uncertainty_score":0.050442874},"labels":[],"label_agreement":null},{"id":"W3135388229","doi":"10.3390/en14061553","title":"Simulation of Energy Exchange between Single Prosumer Residential Building and Utility Grid","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Teadmistepõhise Ehituse Tippkeskus ZEBE; European Regional Development Fund","keywords":"Prosumer; Microgrid; Photovoltaic system; Electricity; Wind power; Environmental economics; Renewable energy; Computer science; Production (economics); Energy storage; Automotive engineering; Environmental science; Reliability engineering; Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.019531568241854383,"score_gpt":0.22777938105968762,"score_spread":0.20824781281783322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135388229","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9566493,0.00012497646,0.02179559,0.00020193055,0.000042551772,0.00007601887,0.0011124344,0.00027794726,0.019719386],"genre_scores_gemma":[0.9961047,0.000047433085,0.0017262629,0.000015085512,0.000002763389,0.000038013728,0.00028966062,0.000014425273,0.0017616623],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998062,0.000076249555,0.000009248355,0.000023854314,0.000026293077,0.00005806915],"domain_scores_gemma":[0.9994331,0.00034559506,0.000048154678,0.000036566784,0.00007690988,0.000059666912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036291237,0.00053906895,0.00085558224,0.00041475435,0.0004916884,0.00071092474,0.00075449946,0.0010336762,0.0043666987],"category_scores_gemma":[0.0009598987,0.00028145278,0.00066112226,0.00070785376,0.000528497,0.0005988109,0.0005689467,0.0006975759,0.00026085883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057862868,0.00002471996,0.0009936213,0.000010753699,0.000008389555,0.000047038633,0.00001884919,0.9975133,0.00022986963,0.00043151004,0.000110496374,0.0005536045],"study_design_scores_gemma":[0.000013232283,0.00003103589,0.00041972677,0.0000020654977,0.0000046014293,0.000005156729,0.000037121332,0.9989335,0.000214571,0.00020582399,0.00012991313,0.0000032597234],"about_ca_topic_score_codex":0.028513314,"about_ca_topic_score_gemma":0.013577845,"teacher_disagreement_score":0.028513314,"about_ca_system_score_codex":0.00083747966,"about_ca_system_score_gemma":0.00076034304,"threshold_uncertainty_score":0.056694686},"labels":[],"label_agreement":null},{"id":"W3136513999","doi":"10.18280/jesa.540102","title":"Optimal Operation of Micro-Grids to Reduce Energy Production Costs and Environmental Pollution Using Ant Colony Optimization Algorithm (ACO)","year":2021,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ant colony optimization algorithms; Renewable energy; Wind power; Computer science; Environmental pollution; Reliability (semiconductor); Grid; Production (economics); Energy management; Electricity generation; Electric potential energy; Electric power; Reliability engineering; Energy (signal processing); Mathematical optimization; Algorithm; Power (physics); Environmental science; Engineering; Electrical engineering","score_opus":0.009314010419615474,"score_gpt":0.2132338833818908,"score_spread":0.20391987296227534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136513999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2671543,0.00088866404,0.71178514,0.0005476963,0.00011130798,0.00018089326,0.000098295386,0.0007310024,0.018502668],"genre_scores_gemma":[0.92699534,0.00022242038,0.06973764,0.0000453502,0.000011558318,0.00006874287,0.000041010444,0.000030478815,0.0028473744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989116,0.0000340521,0.000004838586,0.000021275046,0.00003059726,0.000017919912],"domain_scores_gemma":[0.9998386,0.00008262953,0.000030315141,0.000009177584,0.00002906617,0.000010200305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021110274,0.00036431992,0.00039665328,0.00027538175,0.00025672014,0.0005202038,0.000360477,0.00030601805,0.001053771],"category_scores_gemma":[0.00046621438,0.00014474626,0.00022213938,0.00029364062,0.00021169716,0.00035792548,0.00022841366,0.00026809762,0.000119576915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048927315,0.000047011225,0.0006452677,0.000039030958,0.000022186105,0.00005360593,0.000025093344,0.9682263,0.0033679132,0.0021814401,0.0006591502,0.024684168],"study_design_scores_gemma":[0.000008659936,0.000026307329,0.00016312867,0.0000021116114,0.0000050572876,0.0000113358,0.000009886402,0.9981925,0.0005898578,0.00059885456,0.0003904953,0.0000017896149],"about_ca_topic_score_codex":0.004319279,"about_ca_topic_score_gemma":0.0055456813,"teacher_disagreement_score":0.004319279,"about_ca_system_score_codex":0.00029394985,"about_ca_system_score_gemma":0.00062703807,"threshold_uncertainty_score":0.008588254},"labels":[],"label_agreement":null},{"id":"W3136913392","doi":"10.2139/ssrn.3332435","title":"Examining Interconnection and Net Metering Policy for Distributed Generation in the United States","year":2017,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Net metering; Metering mode; Interconnection; Business; Net (polyhedron); Computer science; Distributed generation; Telecommunications; Engineering; Electrical engineering; Mathematics; Renewable energy","score_opus":0.026897830388792256,"score_gpt":0.25255749084362455,"score_spread":0.2256596604548323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136913392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98435116,0.00019719328,0.0003969735,0.0028303317,0.000029130453,0.000009574166,0.00035032188,0.000009290137,0.011826139],"genre_scores_gemma":[0.99817204,0.0001135455,0.000073372394,0.00021124246,0.000010512019,0.0000032207495,0.0001219872,0.0000026823175,0.0012914458],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994112,0.00023830989,0.000030465491,0.00006385899,0.00009852227,0.00015757092],"domain_scores_gemma":[0.9961287,0.0021574514,0.0008277067,0.000088182096,0.0005135492,0.000284353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012839444,0.00012372884,0.00025785295,0.00042785855,0.00045247993,0.0021525677,0.00043457688,0.00088005763,0.0030713212],"category_scores_gemma":[0.005861536,0.00017212078,0.0002563132,0.0009881972,0.0005122391,0.0012994176,0.00060483476,0.0012001478,0.0001320236],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014281546,0.0006916297,0.73221135,0.00013068097,0.00028706403,0.000889369,0.0012887176,0.1353561,0.001673424,0.08104047,0.016755773,0.028247304],"study_design_scores_gemma":[0.00013786918,0.00048502744,0.8271154,0.00012488138,0.000359526,0.00010382822,0.013464482,0.107034184,0.0017461963,0.03136582,0.018003302,0.000059331407],"about_ca_topic_score_codex":0.122491315,"about_ca_topic_score_gemma":0.27942395,"teacher_disagreement_score":0.122491315,"about_ca_system_score_codex":0.0040598717,"about_ca_system_score_gemma":0.0024942185,"threshold_uncertainty_score":0.24355662},"labels":[],"label_agreement":null},{"id":"W3137225947","doi":"10.3390/s21062152","title":"Recent Advances in Internet of Things (IoT) Infrastructures for Building Energy Systems: A Review","year":2021,"lang":"en","type":"review","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Internet of Things; Building automation; Energy consumption; Computer science; Efficient energy use; Greenhouse gas; Systems engineering; Architectural engineering; Risk analysis (engineering); Engineering; Computer security","score_opus":0.0171714034897836,"score_gpt":0.28067637496583303,"score_spread":0.26350497147604945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3137225947","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002657094,0.99705493,0.00027936435,0.00028428025,0.00024668893,0.00001077787,0.000045818633,0.000011459083,0.0018009591],"genre_scores_gemma":[0.00086548936,0.9982079,0.0003196806,0.00011455591,0.00010142696,0.0000069486605,0.00004031382,0.0000016996011,0.0003419913],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996338,0.00005806417,0.00007149866,0.0000604031,0.00014529166,0.000031019725],"domain_scores_gemma":[0.9987588,0.0007517085,0.0001572287,0.000026482849,0.00026557726,0.000040105308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007132656,0.0010000527,0.0010936919,0.004229619,0.00032256288,0.0012404603,0.0007066877,0.00088850607,0.0057208193],"category_scores_gemma":[0.001281477,0.00039087576,0.0008690846,0.006021044,0.00030696567,0.0017722633,0.00062250666,0.0010643308,0.0015876166],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005265885,0.00007763808,0.00035571295,0.09479613,0.00013633705,0.00026049296,0.00021635904,0.0007970898,0.0019025103,0.005663566,0.023881312,0.8718602],"study_design_scores_gemma":[0.0000062995728,0.00009931762,0.0013563624,0.017532492,0.00031042573,0.00073249504,0.00022609209,0.00013855069,0.00053689774,0.0019940222,0.97703755,0.00002955169],"about_ca_topic_score_codex":0.0017127808,"about_ca_topic_score_gemma":0.0033827687,"teacher_disagreement_score":0.0057208193,"about_ca_system_score_codex":0.0005896956,"about_ca_system_score_gemma":0.0019762716,"threshold_uncertainty_score":0.019138038},"labels":[],"label_agreement":null},{"id":"W3139172156","doi":"10.3389/fenrg.2022.831462","title":"Industrial Flexibility as Demand Side Response for Electrical Grid Stability","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"H2020 Marie Skłodowska-Curie Actions; Horizon 2020 Framework Programme; Swiss Competence Center for Energy Research – Supply of Electricity","keywords":"Renewable energy; Electricity; Grid; Flexibility (engineering); Environmental economics; Demand response; Electric power system; Scheduling (production processes); Wind power; Computer science; Unit cost; Operations management; Engineering; Economics; Electrical engineering; Power (physics); Microeconomics","score_opus":0.07530064683355576,"score_gpt":0.3108309628670985,"score_spread":0.23553031603354274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139172156","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20800816,0.0020125855,0.607837,0.0030473853,0.0002829099,0.00015919884,0.00030723686,0.0010373754,0.17730813],"genre_scores_gemma":[0.9876489,0.0002297204,0.009754086,0.000056748304,0.00003764936,0.000018526143,0.000034481185,0.000041618874,0.0021782517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993637,0.00023988532,0.00001967822,0.00008438872,0.00021315058,0.000079214864],"domain_scores_gemma":[0.999193,0.00041306423,0.00014099077,0.00010729265,0.00008537335,0.00006019548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009795518,0.00046354427,0.00032400156,0.0004902212,0.00040795424,0.0019006495,0.00067785353,0.0007039406,0.006766126],"category_scores_gemma":[0.0022299807,0.00018169092,0.00042619,0.0007648544,0.0009126455,0.0015407563,0.00088040583,0.0006630051,0.00046097202],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025785895,0.00010092953,0.0022440113,0.00013141867,0.000045837718,0.000302141,0.00017065684,0.63880235,0.010258696,0.2523872,0.0025715108,0.09272741],"study_design_scores_gemma":[0.000044534696,0.00022196725,0.0026374392,0.0000610371,0.000027154234,0.00019371836,0.00017926392,0.8187032,0.0030300855,0.16107428,0.013766786,0.000060599596],"about_ca_topic_score_codex":0.001281648,"about_ca_topic_score_gemma":0.0014673,"teacher_disagreement_score":0.006766126,"about_ca_system_score_codex":0.001071596,"about_ca_system_score_gemma":0.0004973168,"threshold_uncertainty_score":0.022634983},"labels":[],"label_agreement":null},{"id":"W3139436443","doi":"10.1145/3263878","title":"Session details: Special Issue on the 2016 Greenmetrics Workshop","year":2016,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Information and Communications Technology; Session (web analytics); Sustainability; Flexibility (engineering); Work (physics); Data sharing; Computer science; Engineering management; Telecommunications; Engineering; World Wide Web; Management","score_opus":0.06319556094292249,"score_gpt":0.2982584745686394,"score_spread":0.2350629136257169,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139436443","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019446454,0.01135175,0.006624102,0.10117472,0.6158967,0.001178885,0.012919212,0.0036218986,0.24528804],"genre_scores_gemma":[0.007392428,0.007885275,0.0037883068,0.015375692,0.1182128,0.001229936,0.013391283,0.0030978909,0.8296264],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958442,0.00079361204,0.00021575912,0.00078428537,0.0017560133,0.0006061551],"domain_scores_gemma":[0.9920516,0.0009077446,0.000341615,0.0004566532,0.00300292,0.0032394053],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0077715917,0.0025168746,0.0016863701,0.002168318,0.003057924,0.009614327,0.002572851,0.004115894,0.39787626],"category_scores_gemma":[0.011059517,0.0006317686,0.0018941135,0.002224086,0.00091249374,0.006953834,0.0064530997,0.0055985777,0.23745482],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000331732,0.000019871119,0.0000332593,0.000053561227,0.0000024895921,0.000011705302,0.000028267883,0.000023706934,0.00008491659,0.00044177606,0.9908896,0.008377646],"study_design_scores_gemma":[0.000011681453,0.000019052097,0.00023932366,0.00010930589,0.0000021475532,0.000013035755,0.000098796074,0.000051961037,0.000051424824,0.00067407294,0.9987206,0.000008577762],"about_ca_topic_score_codex":0.0021278406,"about_ca_topic_score_gemma":0.005493511,"teacher_disagreement_score":0.39787626,"about_ca_system_score_codex":0.0036318721,"about_ca_system_score_gemma":0.0037142,"threshold_uncertainty_score":0.85885644},"labels":[],"label_agreement":null},{"id":"W3140391559","doi":"10.1109/isgt49243.2021.9372233","title":"Interface Module for Smart Load Participants in a Transactive Energy Environment- Design and Implementation","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Computer science; Nash equilibrium; Smart grid; Interface (matter); Distributed computing; Energy supply; Energy (signal processing); Electrical engineering; Operating system; Engineering; Economics","score_opus":0.021869973918079273,"score_gpt":0.2450933964030975,"score_spread":0.22322342248501822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3140391559","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04299456,0.00009922761,0.92232066,0.00034959213,0.00013476807,0.0013633815,0.00015288185,0.011149048,0.021435896],"genre_scores_gemma":[0.58663034,0.00019751,0.35099176,0.00072113134,0.000101370955,0.0021219247,0.00046612453,0.0010607119,0.05770911],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991872,0.00018283477,0.000044430588,0.00014835797,0.00032373905,0.00011350673],"domain_scores_gemma":[0.9994966,0.000060754945,0.000038317845,0.00010587961,0.00022434945,0.00007401407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009727199,0.00062078284,0.00040411478,0.0005113676,0.00044249342,0.0015944692,0.00294964,0.00094837777,0.016252574],"category_scores_gemma":[0.0010020832,0.0003795231,0.00048607858,0.00025081084,0.00043055648,0.0019357067,0.0013434126,0.0007523245,0.004151332],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002360233,0.0027069703,0.013082372,0.0011014325,0.00025978475,0.0017973094,0.002210545,0.05339848,0.2911731,0.10469866,0.03581575,0.49139535],"study_design_scores_gemma":[0.00044489733,0.0020105527,0.004274189,0.00010537737,0.00017908293,0.0011245088,0.00036284374,0.63492876,0.18162735,0.008935061,0.16585855,0.00014885556],"about_ca_topic_score_codex":0.0009839728,"about_ca_topic_score_gemma":0.00083627837,"teacher_disagreement_score":0.016252574,"about_ca_system_score_codex":0.00056807185,"about_ca_system_score_gemma":0.0006838591,"threshold_uncertainty_score":0.054370284},"labels":[],"label_agreement":null},{"id":"W3141148964","doi":"10.1016/j.epsr.2021.107181","title":"A unified state space model for aggregation and coordination of large-scale TCLs and EVs for frequency regulation","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Microgrid; Control theory (sociology); Population; State space; SIGNAL (programming language); State of charge; Control (management); Engineering; Computer science; Control engineering; Power (physics); Physics; Mathematics; Battery (electricity)","score_opus":0.025107833870937225,"score_gpt":0.29022602006782766,"score_spread":0.2651181861968904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3141148964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039273533,0.00013020847,0.9871084,0.00024969826,0.00007767521,0.000053728876,0.00021610138,0.00039370434,0.007843239],"genre_scores_gemma":[0.87327635,0.0005082786,0.11083765,0.00020641065,0.00015152033,0.00038930846,0.0006852786,0.0001728757,0.013772381],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990658,0.00024125233,0.00005466701,0.00020560424,0.0002860765,0.00014662964],"domain_scores_gemma":[0.9992206,0.0002494298,0.00008559681,0.00010844305,0.00028459931,0.000051324132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001141781,0.0008459186,0.0014545621,0.0005531739,0.0007612399,0.0032727022,0.002420901,0.0016290784,0.006785094],"category_scores_gemma":[0.0022279085,0.00043543667,0.0010211641,0.0010795621,0.0009186053,0.002776974,0.001407601,0.0020081142,0.0013011575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003611923,0.000025779498,0.00016918535,0.000035340385,0.000022712693,0.000058931913,0.00005157535,0.9094884,0.0008500163,0.07895432,0.0014991452,0.008808558],"study_design_scores_gemma":[0.000005149841,0.000009315327,0.000028532535,0.0000031065442,0.0000054555353,0.000006186296,0.000006707135,0.99119425,0.00010386149,0.0079394085,0.0006944722,0.000003572134],"about_ca_topic_score_codex":0.014431811,"about_ca_topic_score_gemma":0.013650075,"teacher_disagreement_score":0.014431811,"about_ca_system_score_codex":0.0015804975,"about_ca_system_score_gemma":0.0020025775,"threshold_uncertainty_score":0.028695583},"labels":[],"label_agreement":null},{"id":"W3142597781","doi":"10.1109/tpec51183.2021.9384929","title":"Optimal Device Sizing for Zero Energy Buildings: Sensitivity of Nonlinear Model to Uncertainties","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Sizing; Zero-energy building; Renewable energy; Photovoltaic system; Sensitivity (control systems); Greenhouse gas; Thermal energy storage; Environmental science; Energy (signal processing); Computer science; Automotive engineering; Engineering; Electrical engineering; Electronic engineering; Mathematics","score_opus":0.018590748288709873,"score_gpt":0.23352626865410314,"score_spread":0.21493552036539326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142597781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36031586,0.001011718,0.6189486,0.00062281766,0.00004631437,0.00011343153,0.0005233935,0.00027566476,0.018142184],"genre_scores_gemma":[0.9909519,0.00014794682,0.00688072,0.000024996161,0.00000627682,0.000036855967,0.000076507946,0.000022401307,0.0018524304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973077,0.00009176248,0.00000836563,0.00005795805,0.000049644023,0.000061402],"domain_scores_gemma":[0.9990798,0.0006761133,0.00011699187,0.000032406704,0.00007494073,0.00001982216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008454262,0.0008841395,0.000933036,0.0003726764,0.0003594963,0.0012617422,0.0006484666,0.00088094576,0.0013757435],"category_scores_gemma":[0.0020155464,0.00061077997,0.00071975857,0.00041270978,0.00084392517,0.0007267704,0.0006700605,0.00086858246,0.00012825524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071274208,0.0000021377064,0.00007864588,0.0000057439456,0.000002392401,0.000008094963,0.000003814859,0.9990902,0.000115130075,0.00035181871,0.000025606441,0.0003092241],"study_design_scores_gemma":[0.0000017848099,0.0000050643675,0.00008036595,0.000001542278,0.0000020145333,0.0000023077428,0.0000048455036,0.99942786,0.000075827884,0.00035880232,0.000037956033,0.0000017258533],"about_ca_topic_score_codex":0.025422864,"about_ca_topic_score_gemma":0.016673645,"teacher_disagreement_score":0.025422864,"about_ca_system_score_codex":0.0013751568,"about_ca_system_score_gemma":0.0010737272,"threshold_uncertainty_score":0.050549805},"labels":[],"label_agreement":null},{"id":"W3143052639","doi":"10.1109/mwc.017.2100187","title":"Empowering Prosumer Communities in Smart Grid with Wireless Communications and Federated Edge Learning","year":2021,"lang":"en","type":"article","venue":"IEEE Wireless Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prosumer; Computer science; Smart grid; Scalability; Renewable energy; Computer security; Distributed computing; Database","score_opus":0.025251263230110777,"score_gpt":0.2554096721745271,"score_spread":0.2301584089444163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143052639","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1626656,0.00024180354,0.8288995,0.00072480866,0.00004718802,0.00009866647,0.00002768707,0.00053659454,0.006758209],"genre_scores_gemma":[0.9553015,0.00006678039,0.04330627,0.0001125268,0.000016028423,0.000044115914,0.00002364938,0.000013220709,0.0011157644],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990841,0.00045546406,0.000027936365,0.00013505698,0.00018018685,0.00011715549],"domain_scores_gemma":[0.999014,0.00044499408,0.00011546797,0.00018138415,0.00014274583,0.00010131195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018908737,0.00047473074,0.0005312344,0.00028192654,0.00060059014,0.0011913498,0.0010379001,0.00084100076,0.0009718609],"category_scores_gemma":[0.002682363,0.00018296349,0.00030730944,0.00031959367,0.0007301811,0.0023085591,0.0020773336,0.00094825804,0.00019456791],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036522516,0.00062766194,0.004321152,0.000073907264,0.00007325173,0.00032479432,0.00033555113,0.79019177,0.0050730747,0.04102325,0.0015607256,0.15602969],"study_design_scores_gemma":[0.000009875835,0.000040507373,0.00015886253,0.0000047084764,0.0000060399366,0.000024773872,0.000043669574,0.981573,0.00092707365,0.01655782,0.0006488397,0.000004887308],"about_ca_topic_score_codex":0.0013131209,"about_ca_topic_score_gemma":0.0016676005,"teacher_disagreement_score":0.0018908737,"about_ca_system_score_codex":0.00046075895,"about_ca_system_score_gemma":0.00081316236,"threshold_uncertainty_score":0.00999999},"labels":[],"label_agreement":null},{"id":"W3144930484","doi":"10.1109/isgt49243.2021.9372260","title":"Including Demand Response and Battery Energy Storage Systems in Uniform Marginal Price Based Electricity Markets","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Software deployment; Renewable energy; Energy storage; Electric power system; Electricity market; Electricity; Environmental economics; Computer science; Business; Electrical engineering; Economics; Power (physics); Engineering","score_opus":0.009728694767861533,"score_gpt":0.19692079077233243,"score_spread":0.1871920960044709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144930484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12742013,0.0010131205,0.7877193,0.0024165327,0.00031502487,0.00028361718,0.000637052,0.00029679656,0.07989848],"genre_scores_gemma":[0.9700117,0.0005044536,0.013202433,0.00014813241,0.0000707157,0.000119376506,0.00008211555,0.000043484237,0.01581746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989568,0.00047286545,0.000030562605,0.00017508675,0.00021487621,0.00014983362],"domain_scores_gemma":[0.9991855,0.00044409191,0.00015244781,0.000045053606,0.0001159314,0.000056983354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014380895,0.00081795506,0.0010529166,0.0004493381,0.0005040553,0.002501422,0.0023365605,0.0018299774,0.005363594],"category_scores_gemma":[0.0029151929,0.0006667515,0.0010410625,0.00065968785,0.0011287357,0.0045163375,0.0010700439,0.0015953341,0.0004658654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008194306,0.000067496185,0.00040640862,0.00007240164,0.000031458614,0.00043430363,0.00006193425,0.8442739,0.0012079433,0.14723924,0.001025289,0.005097642],"study_design_scores_gemma":[0.000014313526,0.000039105133,0.00010803237,0.0000056403965,0.000008826225,0.000049900453,0.00002170925,0.98621607,0.00017231153,0.012592469,0.0007624771,0.000009073778],"about_ca_topic_score_codex":0.0045857853,"about_ca_topic_score_gemma":0.0053602266,"teacher_disagreement_score":0.005363594,"about_ca_system_score_codex":0.0014871889,"about_ca_system_score_gemma":0.0014850243,"threshold_uncertainty_score":0.017942965},"labels":[],"label_agreement":null},{"id":"W3145843058","doi":"10.1109/ccwc51732.2021.9376009","title":"An open source SCADA for a solar water pumping system designed for Pakistani Conditions","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Memorial University of Newfoundland","keywords":"SCADA; Dashboard; Photovoltaic system; Arduino; Open source; Data logger; Voltage; Automotive engineering; Computer science; Environmental science; Real-time computing; Engineering; Electrical engineering; Embedded system; Operating system; Software","score_opus":0.01882057998922059,"score_gpt":0.25501662166685785,"score_spread":0.23619604167763725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145843058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20601207,0.00072640233,0.5136506,0.00091216806,0.00097353477,0.0018556835,0.007872313,0.15132709,0.11667006],"genre_scores_gemma":[0.904984,0.0003078734,0.04854266,0.00022240309,0.00012873199,0.00045217358,0.0044604465,0.0009685204,0.039933205],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99961436,0.00006049463,0.000029685694,0.00008347327,0.00016821524,0.000043761123],"domain_scores_gemma":[0.9993339,0.000050074184,0.000061118815,0.00010620883,0.000404162,0.00004447519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003540753,0.0005400409,0.00034583118,0.0005441526,0.00046718545,0.00068536494,0.00053898623,0.00030716415,0.014342388],"category_scores_gemma":[0.0008083928,0.00016656128,0.00014088121,0.0005376096,0.00020793405,0.0005313476,0.00028923008,0.00038842382,0.0043950896],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017618743,0.0004823702,0.021033881,0.00090742094,0.00015771942,0.0014682496,0.0011565953,0.025620269,0.1788298,0.008596862,0.17963125,0.5803536],"study_design_scores_gemma":[0.00050848257,0.0013577081,0.044957027,0.00014712063,0.0002463976,0.0015836249,0.00027980242,0.19338012,0.16947584,0.0023718898,0.5855048,0.00018720752],"about_ca_topic_score_codex":0.003604317,"about_ca_topic_score_gemma":0.0027581246,"teacher_disagreement_score":0.014342388,"about_ca_system_score_codex":0.0005146796,"about_ca_system_score_gemma":0.00069733465,"threshold_uncertainty_score":0.04798007},"labels":[],"label_agreement":null},{"id":"W3148578637","doi":"10.1016/j.apenergy.2021.116833","title":"Deleterious effects of strategic, profit-seeking energy storage operation on electric power system costs","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Natural Science Foundation of China; National Key Research and Development Program of China; Carnegie Mellon University; National Science Foundation","keywords":"Energy storage; Peaking power plant; Electric power system; Environmental economics; Work (physics); Grid; Unintended consequences; Business; Profit (economics); Marginal cost; Industrial organization; Key (lock); Microeconomics; Power (physics); Risk analysis (engineering); Economics; Renewable energy; Computer science; Distributed generation; Engineering; Electrical engineering; Computer security","score_opus":0.005266929753041272,"score_gpt":0.17452161853958556,"score_spread":0.1692546887865443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148578637","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9798564,0.00022043673,0.0017728629,0.0010187547,0.00006081379,0.000019286179,0.0002472273,0.00006319288,0.016740996],"genre_scores_gemma":[0.9993548,0.000044808407,0.00012292669,0.000027627519,0.0000063335533,0.0000017053063,0.000018675662,0.0000036325887,0.00041944374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992829,0.0002522084,0.00004750326,0.000045427805,0.00016271551,0.00020928303],"domain_scores_gemma":[0.9883803,0.00792646,0.0014428322,0.00057684456,0.0011139852,0.00055952097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020429892,0.00043924857,0.0004385917,0.0006624158,0.00063333183,0.0016398396,0.00044361915,0.0010427202,0.0064653214],"category_scores_gemma":[0.011787937,0.00027002697,0.0003997003,0.0007491897,0.0008629703,0.0012328447,0.00079628895,0.00093623105,0.00038770595],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009645596,0.0014787641,0.14057678,0.00046140768,0.00039206975,0.004942625,0.0005379332,0.56977504,0.03161132,0.116132826,0.011200788,0.11324491],"study_design_scores_gemma":[0.0005375092,0.0040259543,0.34856492,0.00024776987,0.0008443599,0.0036266444,0.0073478054,0.41606346,0.03488691,0.17449006,0.009073955,0.00029068365],"about_ca_topic_score_codex":0.0025694794,"about_ca_topic_score_gemma":0.0045508468,"teacher_disagreement_score":0.0064653214,"about_ca_system_score_codex":0.0011569633,"about_ca_system_score_gemma":0.0011838824,"threshold_uncertainty_score":0.021628618},"labels":[],"label_agreement":null},{"id":"W3149068439","doi":"10.18280/ijsdp.160110","title":"Economic Planning of the Operation of PV-Connected Distribution Network Using a Probabilistic Model for Extending the Network Lifetime","year":2021,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Probabilistic logic; Battery (electricity); Photovoltaic system; Power (physics); Reliability engineering; Gaussian; Computer science; Voltage; Automotive engineering; Mathematical optimization; Engineering; Electrical engineering; Mathematics","score_opus":0.015703089086014154,"score_gpt":0.23695408025431364,"score_spread":0.2212509911682995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149068439","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12329846,0.00042730494,0.85835516,0.00043636197,0.000041509553,0.00021077656,0.00048113617,0.00017236221,0.016576912],"genre_scores_gemma":[0.9675,0.00030304358,0.026393713,0.0000240997,0.000014479421,0.00020127404,0.00014781169,0.000031072614,0.0053844545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957424,0.00016204771,0.000011787136,0.000065111046,0.00010342922,0.000083330255],"domain_scores_gemma":[0.9994153,0.00034833583,0.000082573046,0.000024308354,0.000084749234,0.00004487249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008470478,0.00068367535,0.00068755756,0.0005825526,0.00051400746,0.0010773409,0.0011575348,0.0007852378,0.002866338],"category_scores_gemma":[0.0018036453,0.00078063447,0.00061160605,0.0009053232,0.00058029266,0.0014899437,0.000518039,0.00073815027,0.00022500043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010134,0.0000045131114,0.00014224979,0.000007675385,0.000004292815,0.000023488043,0.000005844623,0.99617213,0.00014274866,0.002330926,0.000074211166,0.0010818],"study_design_scores_gemma":[0.0000022830397,0.000009048958,0.00008696039,0.000001820243,0.0000039867036,0.000008835783,0.000007957596,0.99804014,0.000073412804,0.0016095088,0.00015381447,0.0000023343405],"about_ca_topic_score_codex":0.009579384,"about_ca_topic_score_gemma":0.0144246165,"teacher_disagreement_score":0.009579384,"about_ca_system_score_codex":0.0019552994,"about_ca_system_score_gemma":0.0013747265,"threshold_uncertainty_score":0.01904726},"labels":[],"label_agreement":null},{"id":"W3150436106","doi":"","title":"Active power regulation of wind power systems through demand response","year":2012,"lang":"en","type":"article","venue":"中国科学:技术科学(英文版)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Wind power; Electric power system; Demand response; Renewable energy; Production (economics); Environmental economics; Power (physics); Computer science; Economics; Electricity; Engineering; Microeconomics; Electrical engineering","score_opus":0.009627678434239357,"score_gpt":0.21177339695519112,"score_spread":0.20214571852095176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3150436106","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12766501,0.00022394177,0.8602938,0.00035267242,0.00007478253,0.000083744315,0.000062676394,0.00089257106,0.010350782],"genre_scores_gemma":[0.987894,0.00006526018,0.010829888,0.000032320182,0.000015204338,0.000030106024,0.000027518608,0.000024181827,0.0010813926],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997191,0.00011261408,0.000017911634,0.000056983237,0.000069035515,0.00002438704],"domain_scores_gemma":[0.99953246,0.00023560904,0.000070123824,0.000047471414,0.00009944739,0.000014808541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035023334,0.00037235025,0.00029476202,0.00019379417,0.00018581994,0.0005780521,0.00051034376,0.00036322858,0.0009925427],"category_scores_gemma":[0.0009723651,0.0001600776,0.00016394611,0.00020935705,0.00027874866,0.0005942332,0.00034304074,0.0004076421,0.0002517771],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004108066,0.00034611218,0.002693999,0.00025011552,0.00006551114,0.00044820728,0.0003727652,0.7098756,0.07024789,0.021922063,0.0027924909,0.1905745],"study_design_scores_gemma":[0.000014946902,0.00006179074,0.00033944473,0.000004786474,0.0000068893546,0.000043391425,0.000027592318,0.9911335,0.0040093367,0.0030383915,0.0013107075,0.000009266875],"about_ca_topic_score_codex":0.0008284927,"about_ca_topic_score_gemma":0.0010293404,"teacher_disagreement_score":0.0009925427,"about_ca_system_score_codex":0.00024113919,"about_ca_system_score_gemma":0.00016056634,"threshold_uncertainty_score":0.0033203363},"labels":[],"label_agreement":null},{"id":"W3154725632","doi":"10.3390/jrfm14060235","title":"A Computational Approach to Sequential Decision Optimization in Energy Storage and Trading","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Peaking power plant; Battery (electricity); Computer science; Load shifting; Energy storage; Stochastic programming; Demand response; Energy management; Battery storage; Mathematical optimization; Operations research; Power (physics); Electricity generation; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.006663842815768158,"score_gpt":0.18913665065400456,"score_spread":0.1824728078382364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154725632","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006133063,0.0006364824,0.98412526,0.00093548285,0.00014583733,0.000049564926,0.00010171537,0.00006886293,0.0078036464],"genre_scores_gemma":[0.55827445,0.0013294189,0.42321214,0.00053681375,0.00048396635,0.00072634255,0.00027490692,0.00016118638,0.015000802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987986,0.0006945768,0.000051732448,0.00011788086,0.00023388742,0.00010337104],"domain_scores_gemma":[0.9929622,0.0062242835,0.00022395786,0.00014974445,0.00030420616,0.00013557602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025038193,0.0011820906,0.0014685371,0.0007362552,0.0007569697,0.0016807225,0.0014861157,0.0017712471,0.0059810895],"category_scores_gemma":[0.008691876,0.0006685943,0.0012752691,0.001247277,0.0021328898,0.0015389484,0.0018997643,0.0023858198,0.00043800674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003556152,0.000033153618,0.00021964769,0.000055902598,0.000027742764,0.00004951728,0.00003236024,0.8671555,0.00013643256,0.12593287,0.0007805872,0.0055408245],"study_design_scores_gemma":[0.000008073295,0.000006813305,0.000021195681,0.0000051887346,0.0000026658447,0.0000045830834,0.000004437148,0.96739185,0.000029676425,0.032118097,0.00040457587,0.0000027521282],"about_ca_topic_score_codex":0.008543898,"about_ca_topic_score_gemma":0.007860142,"teacher_disagreement_score":0.008543898,"about_ca_system_score_codex":0.0013633332,"about_ca_system_score_gemma":0.0025288863,"threshold_uncertainty_score":0.020008743},"labels":[],"label_agreement":null},{"id":"W3154954407","doi":"10.3390/sym13040647","title":"Modelling of Consumption Shares for Small Wind Energy Prosumers","year":2021,"lang":"en","type":"article","venue":"Symmetry","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"European Regional Development Fund; Norway Grants; Teadmistepõhise Ehituse Tippkeskus ZEBE; Eesti Teadusagentuur","keywords":"Wind power; Electricity; Production (economics); Renewable energy; Consumption (sociology); Computer science; Grid; Generator (circuit theory); Environmental science; Energy consumption; Environmental economics; Automotive engineering; Electrical engineering; Economics; Mathematics; Engineering; Microeconomics; Power (physics); Physics","score_opus":0.03724201932951195,"score_gpt":0.21115437090019043,"score_spread":0.17391235157067847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154954407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8954288,0.00011864041,0.07839403,0.0003553336,0.000036302143,0.00008372077,0.0006676929,0.000116597614,0.024798835],"genre_scores_gemma":[0.9926012,0.00004417382,0.0024818813,0.000013256836,0.0000033934957,0.00003607849,0.00008773702,0.000019312549,0.0047129868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997774,0.000088798806,0.000010193807,0.00004626166,0.000030237119,0.000047048292],"domain_scores_gemma":[0.99944776,0.00034408263,0.00007286657,0.000036060595,0.000055611188,0.000043506345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005473752,0.0005136531,0.00048322772,0.00037075416,0.00044029934,0.001134825,0.0010961273,0.0011420833,0.0049678567],"category_scores_gemma":[0.001721695,0.00043223723,0.000650676,0.00053078315,0.00060974446,0.0012064965,0.0005753927,0.0007543758,0.00032367217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034206678,0.000012767898,0.0005799327,0.000006351687,0.0000044209924,0.00005309531,0.00002472116,0.9954377,0.00029324577,0.0029366824,0.000063989064,0.00055294175],"study_design_scores_gemma":[0.0000057431307,0.000016080134,0.00020282359,0.0000015228597,0.0000025061781,0.000008716892,0.00002648995,0.9986161,0.00012462503,0.0008611247,0.00013085449,0.0000034112604],"about_ca_topic_score_codex":0.016113,"about_ca_topic_score_gemma":0.009628099,"teacher_disagreement_score":0.016113,"about_ca_system_score_codex":0.0012065258,"about_ca_system_score_gemma":0.0005874629,"threshold_uncertainty_score":0.03203845},"labels":[],"label_agreement":null},{"id":"W3157616196","doi":"10.18280/mmep.080201","title":"Optimal Location of Sectionners and Distributed Generation Resources to Improve Reliability in Distribution Networks","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blackout; Reliability (semiconductor); Downstream (manufacturing); Distribution (mathematics); Reliability engineering; Computer science; Power (physics); Distributed generation; Upstream (networking); Distributed computing; Engineering; Computer network; Electric power system; Operations management","score_opus":0.009619036762110929,"score_gpt":0.17973820397471177,"score_spread":0.17011916721260084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157616196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05989593,0.00029598255,0.9368434,0.000111002875,0.000041314946,0.000049918293,0.00004514854,0.00018012064,0.0025372405],"genre_scores_gemma":[0.81005365,0.00048048052,0.18505345,0.00002539852,0.00003179023,0.000079431666,0.00005152486,0.000039930506,0.004184258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979204,0.000065922635,0.000009872768,0.00006862588,0.000030428513,0.000033084816],"domain_scores_gemma":[0.9996449,0.00016537469,0.000083527586,0.000028207569,0.00004810429,0.000029828894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004245852,0.00063731667,0.00083896297,0.00059849303,0.00045817945,0.0006475179,0.00069784955,0.0006747343,0.0016114663],"category_scores_gemma":[0.001512208,0.00040348273,0.00032027447,0.0006041886,0.0005720156,0.0010767648,0.00075038156,0.00040104266,0.0002848116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012868115,0.00005184359,0.0013309725,0.0000798129,0.000020808984,0.00014084447,0.00009990913,0.93251765,0.009882989,0.01735609,0.00073524105,0.03765514],"study_design_scores_gemma":[0.000014637713,0.000094733274,0.00035636703,0.00001246748,0.000018128749,0.0000634773,0.000061086284,0.9870057,0.0035269524,0.0077001387,0.0011333073,0.000013044752],"about_ca_topic_score_codex":0.0022542034,"about_ca_topic_score_gemma":0.00336265,"teacher_disagreement_score":0.0022542034,"about_ca_system_score_codex":0.0006676793,"about_ca_system_score_gemma":0.00070187874,"threshold_uncertainty_score":0.0053908825},"labels":[],"label_agreement":null},{"id":"W3157915181","doi":"","title":"Bilevel models for demand response in smart grids","year":2020,"lang":"en","type":"preprint","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Mathematical optimization; Demand response; Leverage (statistics); Computer science; Optimization problem; Flexibility (engineering); Anticipation (artificial intelligence); Smart grid; Electricity; Mathematics; Engineering","score_opus":0.02089551195150685,"score_gpt":0.22808174209612192,"score_spread":0.20718623014461507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157915181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022693008,0.0019123212,0.96166426,0.00090511295,0.00015798905,0.000051339008,0.00032328593,0.0003052911,0.011987392],"genre_scores_gemma":[0.807627,0.003362977,0.15405373,0.0003193742,0.00020118085,0.000339902,0.0009214174,0.00032241392,0.03285194],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991666,0.00035227655,0.00004044527,0.00013172932,0.00016886464,0.00013995926],"domain_scores_gemma":[0.99817693,0.0012694055,0.00013634925,0.00007829499,0.0002568048,0.00008228415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013210123,0.0013131459,0.0021636793,0.00071800686,0.0005890794,0.0029880917,0.0011787674,0.0019081924,0.00746183],"category_scores_gemma":[0.0055053565,0.00086791685,0.0014910529,0.0014862855,0.00088449044,0.0022229406,0.002254213,0.002390681,0.000981682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048808084,0.000026643278,0.0003241816,0.00009970704,0.000037331774,0.00003441858,0.000055891596,0.9662234,0.00023972413,0.02161824,0.00065151934,0.01064017],"study_design_scores_gemma":[0.0000073050387,0.000012563884,0.00004916137,0.000013950443,0.0000058414735,0.000007158986,0.000020708972,0.9814808,0.00009529679,0.017135357,0.0011664138,0.0000054918546],"about_ca_topic_score_codex":0.008277554,"about_ca_topic_score_gemma":0.008434362,"teacher_disagreement_score":0.008277554,"about_ca_system_score_codex":0.00119842,"about_ca_system_score_gemma":0.0012895372,"threshold_uncertainty_score":0.024962246},"labels":[],"label_agreement":null},{"id":"W3158065780","doi":"10.1109/access.2021.3078082","title":"Multi-Level Energy Management Systems Toward a Smarter Grid: A Review","year":2021,"lang":"en","type":"review","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Energy management; Computer science; Energy management system; Renewable energy; News aggregator; Electric power system; Grid; Management system; Maximization; Smart grid; Electricity; Risk analysis (engineering); Distributed computing; Energy (signal processing); Mathematical optimization; Operations management; Power (physics); Engineering; Business","score_opus":0.15499501936530302,"score_gpt":0.3439599406523228,"score_spread":0.1889649212870198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158065780","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021353656,0.9965724,0.00082586793,0.00026577717,0.00019055871,0.000011098355,0.000021424019,0.000012133985,0.0018872692],"genre_scores_gemma":[0.0015303488,0.9966832,0.0009176626,0.00014363516,0.00015036178,0.000009732564,0.00003450507,0.0000033142449,0.00052726036],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99972373,0.000043886954,0.00004306705,0.000054547923,0.00011166643,0.000023178734],"domain_scores_gemma":[0.99927634,0.0003819919,0.00008890764,0.000024214562,0.00019776971,0.00003081792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007436168,0.00085260207,0.0011086246,0.0024119434,0.00027072063,0.0011578916,0.0010151834,0.0010501066,0.0037747752],"category_scores_gemma":[0.0010261412,0.00040294896,0.0005954167,0.0038087636,0.00034364103,0.0017999181,0.0006322839,0.0011289427,0.0015544603],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052454634,0.000105676685,0.00027172096,0.03136741,0.00012893598,0.00018649336,0.00007898494,0.0018571182,0.0011879127,0.012250361,0.018177068,0.9343359],"study_design_scores_gemma":[0.000010658135,0.00014477565,0.00087124243,0.007871012,0.00020292948,0.00082752435,0.00008742383,0.0006075933,0.0006657978,0.0036830176,0.98499715,0.000030841038],"about_ca_topic_score_codex":0.0012787629,"about_ca_topic_score_gemma":0.0016563201,"teacher_disagreement_score":0.0037747752,"about_ca_system_score_codex":0.000499651,"about_ca_system_score_gemma":0.0013370679,"threshold_uncertainty_score":0.01262784},"labels":[],"label_agreement":null},{"id":"W3158336473","doi":"10.82308/31695","title":"Electricity market-clearing with stochastic security","year":2006,"lang":"en","type":"book","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Fonds Québécois de la Recherche sur la Nature et les Technologies","keywords":"Clearing; Market clearing; Electricity market; Electricity; Business; Computer science; Economics; Engineering; Electrical engineering; Microeconomics; Finance","score_opus":0.005979974826949912,"score_gpt":0.16778491815571928,"score_spread":0.16180494332876935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158336473","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047994874,0.00047292197,0.9313622,0.0011816708,0.0001406909,0.00012982404,0.00028168748,0.00009002559,0.018346092],"genre_scores_gemma":[0.9271116,0.00053715636,0.060086362,0.00015091275,0.00018449491,0.00030032167,0.00027441466,0.000064931526,0.01128976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975159,0.0012264559,0.00011248705,0.00038914397,0.00043640932,0.00031962324],"domain_scores_gemma":[0.99542975,0.0030225723,0.0005875026,0.00020429991,0.00052759127,0.00022827674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002982826,0.0011766477,0.0014889395,0.00050794805,0.00060623715,0.0027837497,0.001096154,0.0016828785,0.0051443093],"category_scores_gemma":[0.008043929,0.00071648875,0.0009903847,0.00068905216,0.001973452,0.0033195901,0.0016066954,0.0018691985,0.00042032835],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004618605,0.000043647666,0.00027581517,0.00006863756,0.000026211676,0.00014067699,0.00006788011,0.6191044,0.00058575073,0.37515372,0.000906572,0.003580546],"study_design_scores_gemma":[0.00003113888,0.000038914135,0.000086623935,0.000012694379,0.0000068819127,0.000032912558,0.000029479701,0.8730427,0.00019425883,0.12536171,0.0011504297,0.0000122956735],"about_ca_topic_score_codex":0.0026708967,"about_ca_topic_score_gemma":0.0025025418,"teacher_disagreement_score":0.0051443093,"about_ca_system_score_codex":0.001962458,"about_ca_system_score_gemma":0.0026606128,"threshold_uncertainty_score":0.01720941},"labels":[],"label_agreement":null},{"id":"W3159219221","doi":"10.1109/pesgm46819.2021.9638038","title":"Domestic Battery Power Management Strategies to Maximize the Profitability and Support the Network","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Interreg; Queen's University; Queen's University Belfast; European Commission","keywords":"Computer science; Electrification; Profitability index; Software deployment; Electricity; Scheduling (production processes); Demand response; Operations research; Engineering; Operations management; Economics; Electrical engineering; Finance","score_opus":0.010399258728217842,"score_gpt":0.22409384008308514,"score_spread":0.2136945813548673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3159219221","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27187318,0.00053747307,0.6855999,0.00047256376,0.00007165371,0.00021863644,0.00012493377,0.0010750385,0.040026493],"genre_scores_gemma":[0.9495167,0.00015563243,0.047627613,0.000059348375,0.000016751526,0.00004291446,0.000053926426,0.000039446302,0.0024876278],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997174,0.00008421554,0.000016567501,0.000059982085,0.00008278017,0.000038957754],"domain_scores_gemma":[0.99962044,0.00012216409,0.00007528228,0.000045755514,0.0001200943,0.00001623218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004860089,0.0005829761,0.00047953395,0.00034642563,0.0003493232,0.00093225803,0.00080023,0.0003795133,0.0013496829],"category_scores_gemma":[0.00095082464,0.00016898048,0.00016174556,0.00043778302,0.0002327048,0.00073989615,0.00029248753,0.0002958499,0.00027472773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011654626,0.0002408402,0.0032342626,0.00007589352,0.000047186004,0.00009458009,0.000118433316,0.7414042,0.009154149,0.006955146,0.0024593726,0.23609944],"study_design_scores_gemma":[0.000022373419,0.00010797273,0.0009838477,0.000010110992,0.000018902398,0.00007701245,0.00007839894,0.9876853,0.005864313,0.0028041287,0.0023365957,0.000011091437],"about_ca_topic_score_codex":0.0029890991,"about_ca_topic_score_gemma":0.0060320636,"teacher_disagreement_score":0.0029890991,"about_ca_system_score_codex":0.0007134591,"about_ca_system_score_gemma":0.0006166782,"threshold_uncertainty_score":0.0059434175},"labels":[],"label_agreement":null},{"id":"W3160179685","doi":"10.1049/gtd2.12205","title":"Value‐stack aggregator optimal planning considering disparate DERs technologies","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Computer science; Value proposition; Capacity planning; Energy planning; Environmental economics; Business; Renewable energy; Economics; Engineering; Finance; Marketing","score_opus":0.019013116041665355,"score_gpt":0.22964733938292126,"score_spread":0.2106342233412559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160179685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33402964,0.0011464136,0.5998627,0.0011262799,0.00012584125,0.00045377333,0.001334027,0.00051441224,0.06140698],"genre_scores_gemma":[0.9689649,0.00021221048,0.023753326,0.00006588057,0.000012230902,0.00019008097,0.00027032703,0.0000380806,0.006492932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994992,0.0002151939,0.000015592967,0.00007357442,0.000082998595,0.00011341826],"domain_scores_gemma":[0.9990715,0.0005638692,0.00008876269,0.00002886334,0.00016113764,0.00008590983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011201805,0.0012478282,0.0013033964,0.0008056621,0.0006859537,0.0021398163,0.00087153126,0.001376161,0.003934867],"category_scores_gemma":[0.0019492722,0.0008374534,0.00089996244,0.0010712092,0.0007915711,0.0010946023,0.0010094744,0.0012348526,0.0002927612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001042082,0.0000061977225,0.000073376876,0.0000052632513,0.0000047137833,0.000019087875,0.000004317821,0.9980057,0.000048608297,0.00091622927,0.00008337328,0.00082266313],"study_design_scores_gemma":[0.00000500506,0.000011844722,0.000044806042,0.0000023071752,0.000004111612,0.0000022329941,0.000009774343,0.9988733,0.00004391788,0.00088073313,0.00011930253,0.0000026234804],"about_ca_topic_score_codex":0.032681588,"about_ca_topic_score_gemma":0.026061127,"teacher_disagreement_score":0.032681588,"about_ca_system_score_codex":0.002374685,"about_ca_system_score_gemma":0.002574687,"threshold_uncertainty_score":0.06498271},"labels":[],"label_agreement":null},{"id":"W3160258797","doi":"10.1109/tsg.2021.3078695","title":"TraceGAN: Synthesizing Appliance Power Signatures Using Generative Adversarial Networks","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bottleneck; Computer science; Generator (circuit theory); Smart meter; Discriminative model; Generative grammar; Generative adversarial network; Data mining; Adversarial system; Electricity; Conditional random field; Power (physics); Machine learning; Data collection; Artificial intelligence; Engineering; Deep learning; Embedded system","score_opus":0.013020666082572267,"score_gpt":0.21087801055025812,"score_spread":0.19785734446768585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160258797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05579755,0.00022699524,0.93579316,0.00043332676,0.00008202317,0.00008557683,0.0003980681,0.0028038071,0.004379562],"genre_scores_gemma":[0.8225133,0.00015670843,0.17052816,0.00039020478,0.000038938306,0.00015822364,0.0013107415,0.00040036096,0.0045034015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997397,0.000100287354,0.0000074145087,0.000067372326,0.000056455825,0.000028760167],"domain_scores_gemma":[0.99916744,0.0005875922,0.000046280908,0.00011098941,0.00006686057,0.000020874291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007019383,0.00093867705,0.00034454526,0.00029620805,0.0001756876,0.00043496356,0.0008108237,0.0005868132,0.001731468],"category_scores_gemma":[0.002497413,0.0003411862,0.00043621878,0.0002554006,0.00059765315,0.0007608315,0.0008645988,0.0013932429,0.0004787986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005504496,0.000030847077,0.00072973716,0.00003583142,0.000024346653,0.00006226172,0.000034724962,0.9541834,0.0031130863,0.005208541,0.002073016,0.034449156],"study_design_scores_gemma":[0.0000036722336,0.000012764353,0.0000791308,0.0000035522214,0.000001956574,0.000013858085,0.0000035114829,0.9951747,0.0015530922,0.0027522931,0.00039864553,0.000002859543],"about_ca_topic_score_codex":0.0023854452,"about_ca_topic_score_gemma":0.0044446457,"teacher_disagreement_score":0.0023854452,"about_ca_system_score_codex":0.00051239197,"about_ca_system_score_gemma":0.0004314752,"threshold_uncertainty_score":0.00579232},"labels":[],"label_agreement":null},{"id":"W3163233944","doi":"10.48550/arxiv.2105.08122","title":"A Data-Efficient Approach to Behind-the-Meter Solar Generation Disaggregation","year":2021,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Photovoltaic system; Smart meter; Software deployment; AKA; Proxy (statistics); Cost of electricity by source; Computer science; Metre; Solar energy; Environmental science; Real-time computing; Electricity generation; Smart grid; Engineering; Electrical engineering","score_opus":0.11848980343020377,"score_gpt":0.17793475894432753,"score_spread":0.059444955514123765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163233944","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01566404,0.00027194148,0.9812965,0.00021109599,0.000056697503,0.000047940317,0.00051033834,0.001046242,0.0008952059],"genre_scores_gemma":[0.48264936,0.0002658279,0.51223356,0.00017692763,0.00017463861,0.00012393905,0.0025911957,0.0001928549,0.0015916874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918145,0.00022669965,0.000065817,0.00025300012,0.0002052511,0.00006769405],"domain_scores_gemma":[0.99833703,0.00061093696,0.00016794264,0.00051502645,0.00031828298,0.00005085883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011191458,0.0010242586,0.0012547707,0.0011551644,0.0005282009,0.0011429094,0.0011739597,0.00062237727,0.00094789494],"category_scores_gemma":[0.0051947893,0.0005156762,0.0007681696,0.0023237492,0.00036310375,0.0013879495,0.0014506046,0.0013435169,0.0006652171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018045651,0.00019676641,0.005956179,0.0001843215,0.00022322268,0.00016596966,0.00031723586,0.5853072,0.00963739,0.009672251,0.006298828,0.38186023],"study_design_scores_gemma":[0.000008204164,0.00001417489,0.0007536676,0.000005874726,0.000010447125,0.000031481555,0.000037439717,0.9872543,0.0014776464,0.0082694935,0.0021280088,0.000009288304],"about_ca_topic_score_codex":0.006452579,"about_ca_topic_score_gemma":0.008164118,"teacher_disagreement_score":0.006452579,"about_ca_system_score_codex":0.0005479473,"about_ca_system_score_gemma":0.0011037593,"threshold_uncertainty_score":0.012830079},"labels":[],"label_agreement":null},{"id":"W3164357312","doi":"10.1049/gtd2.12187","title":"Optimal operation of small, numerous, and disparate DERs via aggregation in transactive distribution systems with universal metering","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Metering mode; Computer science; Distributed computing; Engineering","score_opus":0.009449446107565538,"score_gpt":0.1855467616918588,"score_spread":0.17609731558429326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3164357312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29633754,0.00037604646,0.69570214,0.00030934674,0.00004523791,0.00009521914,0.000045691522,0.00022140972,0.006867364],"genre_scores_gemma":[0.9877672,0.000036314603,0.011618867,0.000015502801,0.00000449626,0.000013443607,0.000008423857,0.0000059801237,0.0005297889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944276,0.00024508993,0.00002658614,0.00009416153,0.000068452064,0.00012293729],"domain_scores_gemma":[0.99931395,0.00035339087,0.00011491056,0.000044273285,0.00010398218,0.00006939255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012851475,0.0007551073,0.0008962025,0.0003590223,0.00052032154,0.0012991446,0.0006619201,0.0005546411,0.0009181],"category_scores_gemma":[0.0012929381,0.0003269098,0.00036394884,0.00046869987,0.00077706674,0.0011026347,0.0012249664,0.0005856714,0.000086781794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073966025,0.000030618314,0.0004813885,0.00001631773,0.000020127853,0.00006820655,0.000035059467,0.9866301,0.0011070346,0.0020036374,0.00014581069,0.009387708],"study_design_scores_gemma":[0.0000051716406,0.00003131132,0.00008954643,0.000001613889,0.0000049698383,0.000008068029,0.00002471222,0.99842656,0.00032543336,0.0009934361,0.00008700867,0.0000021508417],"about_ca_topic_score_codex":0.0055332934,"about_ca_topic_score_gemma":0.0052878587,"teacher_disagreement_score":0.0055332934,"about_ca_system_score_codex":0.0010753194,"about_ca_system_score_gemma":0.0007124056,"threshold_uncertainty_score":0.011002183},"labels":[],"label_agreement":null},{"id":"W3164739391","doi":"10.1049/gtd2.12182","title":"Comprehensive platform for distribution transactive energy markets","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Computer science; Business; Distributed computing; Environmental economics; Knowledge management; Economics","score_opus":0.019053916717710163,"score_gpt":0.2205824761353535,"score_spread":0.20152855941764333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3164739391","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07974867,0.00026755274,0.8533961,0.0005206154,0.00011231145,0.0003901578,0.00021948658,0.0007689102,0.06457622],"genre_scores_gemma":[0.8896684,0.00023371557,0.0880567,0.00009898084,0.000031241256,0.00029080492,0.00017896811,0.00006735541,0.02137369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996965,0.000089237634,0.000010067728,0.00005068998,0.00010064729,0.000052880125],"domain_scores_gemma":[0.9997421,0.00007973716,0.000030797786,0.000035499965,0.00007009788,0.000041867614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006181252,0.00069664617,0.0004188308,0.0003544247,0.00035658068,0.0011940172,0.0009640404,0.00084726943,0.012459266],"category_scores_gemma":[0.0008145145,0.0002529156,0.0005131757,0.00035020564,0.00044837626,0.0015392444,0.0020350716,0.0011131209,0.0011290712],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081061575,0.00020116272,0.0002502849,0.00008142504,0.00001907676,0.00031052853,0.000044974553,0.844031,0.0059933313,0.11703644,0.002854255,0.029096363],"study_design_scores_gemma":[0.000018544128,0.00007720526,0.00006666549,0.00000865986,0.000003728042,0.000032132233,0.000019990171,0.98031116,0.00086628547,0.014165823,0.0044228598,0.000006901188],"about_ca_topic_score_codex":0.0017555251,"about_ca_topic_score_gemma":0.0023875353,"teacher_disagreement_score":0.012459266,"about_ca_system_score_codex":0.00068618584,"about_ca_system_score_gemma":0.0012020923,"threshold_uncertainty_score":0.041680455},"labels":[],"label_agreement":null},{"id":"W3165380363","doi":"10.11575/prism/35998","title":"Impact Of Demand Side Management On The Residential Electricity Use In The City Of Calgary","year":2017,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand side; Electricity; Business; Electricity demand; Demand management; Operations management; Environmental planning; Natural resource economics; Environmental economics; Geography; Economics; Engineering; Electricity generation; Power (physics)","score_opus":0.014454111464222269,"score_gpt":0.20241883245414327,"score_spread":0.187964720989921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165380363","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925689,0.00007174996,0.00006177781,0.00068987446,0.0000070000724,0.000010177841,0.00019924632,0.000010320713,0.0063809035],"genre_scores_gemma":[0.99816835,0.00008143129,0.000066041364,0.00011850556,0.0000041357057,0.0000034268976,0.00013875953,0.0000037194225,0.0014156725],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996408,0.000086356384,0.000006772798,0.000022098178,0.00009111523,0.00015281489],"domain_scores_gemma":[0.9995615,0.00007057268,0.000057798108,0.00002181747,0.00015021542,0.00013810162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014758256,0.00013445913,0.00018773138,0.0002792333,0.0009870619,0.0010197748,0.0005355423,0.00033595716,0.0028017594],"category_scores_gemma":[0.00075145887,0.00012474516,0.00018933376,0.00065913954,0.00050742686,0.00021820377,0.00085497426,0.0004969588,0.00017885138],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007248318,0.0009886379,0.8625239,0.00012091007,0.00019826725,0.0032453279,0.0031638888,0.017847054,0.007417267,0.0019958974,0.013892757,0.0878812],"study_design_scores_gemma":[0.000027324204,0.00010990807,0.9844669,0.000023068435,0.000032486038,0.00013363767,0.0067691715,0.0037515983,0.000732942,0.00017261246,0.0037610505,0.000019299874],"about_ca_topic_score_codex":0.76308167,"about_ca_topic_score_gemma":0.8868617,"teacher_disagreement_score":0.23691833,"about_ca_system_score_codex":0.008262469,"about_ca_system_score_gemma":0.004132125,"threshold_uncertainty_score":0.47662717},"labels":[],"label_agreement":null},{"id":"W3165461565","doi":"10.1109/mim.2021.9436092","title":"An Overview of IoT-Enabled Monitoring and Control Systems for Electric Vehicles","year":2021,"lang":"en","type":"article","venue":"IEEE Instrumentation & Measurement Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Internet of Things; Pace; Smart city; Battery (electricity); Wireless sensor network; Computer science; Cloud computing; Efficient energy use; Electric vehicle; Smart grid; Computer security; Systems engineering; Telecommunications; Engineering; Computer network; Electrical engineering","score_opus":0.051642082920377266,"score_gpt":0.2667346750215015,"score_spread":0.21509259210112425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165461565","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007137414,0.29484582,0.51379514,0.0037139645,0.0035003212,0.00065400376,0.0015987995,0.0059316643,0.16882285],"genre_scores_gemma":[0.14177778,0.42797467,0.28191054,0.0034335344,0.0044366713,0.0010928917,0.006814204,0.0006876794,0.13187206],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99958414,0.00004285411,0.000052177504,0.00007161986,0.00021461782,0.000034597575],"domain_scores_gemma":[0.9996654,0.000066260494,0.000028997516,0.000030662086,0.00017975604,0.000029076937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043103902,0.0010101612,0.0005431434,0.0012273642,0.00037172902,0.001409583,0.000795183,0.001216629,0.008684603],"category_scores_gemma":[0.00052866683,0.00042495874,0.000424236,0.0014028056,0.00019519318,0.0020457746,0.00074479054,0.001282491,0.005487265],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015791199,0.00018374975,0.0012926536,0.0026009092,0.00008074475,0.00035206866,0.00013564463,0.008741613,0.022745997,0.03561864,0.07818806,0.84990203],"study_design_scores_gemma":[0.000014868156,0.00024446522,0.0014638274,0.00070764875,0.00005295712,0.0006755149,0.00006222289,0.024360089,0.004181587,0.0075068315,0.96068627,0.000043802538],"about_ca_topic_score_codex":0.0011515521,"about_ca_topic_score_gemma":0.0012963451,"teacher_disagreement_score":0.008684603,"about_ca_system_score_codex":0.00042014226,"about_ca_system_score_gemma":0.00057897565,"threshold_uncertainty_score":0.029052913},"labels":[],"label_agreement":null},{"id":"W3167076394","doi":"10.82308/39049","title":"Quantification of ancillary service provision by microgrid","year":2016,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Service (business); Business; Computer science; Marketing","score_opus":0.011667864848430451,"score_gpt":0.19430994528952192,"score_spread":0.18264208044109148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167076394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8747883,0.00066885777,0.102892704,0.00027028576,0.00006036887,0.00011099797,0.0027013775,0.0012222703,0.017284837],"genre_scores_gemma":[0.9919268,0.00013410734,0.0058876965,0.000010435704,0.000004739181,0.000026045542,0.0004017058,0.000022271604,0.0015862201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99965227,0.00008370419,0.00001851083,0.000071670656,0.000120200326,0.000053703625],"domain_scores_gemma":[0.99942505,0.00027571435,0.00006868154,0.000065868975,0.00013982694,0.00002486119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005676321,0.00077835226,0.00046998073,0.0007799493,0.00028424084,0.0009922335,0.0004899762,0.00042628267,0.0025847836],"category_scores_gemma":[0.0016026,0.00024712775,0.00041627142,0.0013498103,0.0002537634,0.0008016927,0.00045504514,0.00030815616,0.0003615332],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022661399,0.000038311526,0.010342574,0.00017080485,0.00006214898,0.00010936109,0.00006142891,0.9449228,0.0087666605,0.0023124148,0.0007691374,0.03221774],"study_design_scores_gemma":[0.000008815525,0.00011024911,0.010919708,0.000018332003,0.000029537792,0.000036899393,0.000116395975,0.9805069,0.0051152287,0.0013327935,0.0017875334,0.000017693046],"about_ca_topic_score_codex":0.014416639,"about_ca_topic_score_gemma":0.010101928,"teacher_disagreement_score":0.014416639,"about_ca_system_score_codex":0.0010089143,"about_ca_system_score_gemma":0.0006742169,"threshold_uncertainty_score":0.028665423},"labels":[],"label_agreement":null},{"id":"W3167386905","doi":"10.4018/978-1-7998-8335-7.ch011","title":"Optimizing the Power Consumption of Household Appliances Using IoT","year":2021,"lang":"en","type":"book-chapter","venue":"Advances in environmental engineering and green technologies book series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Schedule; MATLAB; Power consumption; Computer science; Consumption (sociology); Internet of Things; Controller (irrigation); Power (physics); Power demand; Simulation; Embedded system; Automotive engineering; Real-time computing; Reliability engineering; Engineering; Operating system","score_opus":0.008614522112877629,"score_gpt":0.17501198334861717,"score_spread":0.16639746123573954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167386905","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060518328,0.010183084,0.6434846,0.00083678926,0.0005704592,0.0001817634,0.00064385,0.0024425383,0.28113863],"genre_scores_gemma":[0.5846385,0.01946702,0.17600003,0.00035603397,0.00018348743,0.00024277299,0.0012709481,0.00081836083,0.21702284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9999398,0.000007229322,0.000002060388,0.00001202579,0.00003193924,0.0000069114894],"domain_scores_gemma":[0.99998283,0.0000056130516,0.0000017058638,0.0000030085444,0.0000058273617,9.956937e-7],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006108651,0.00067292916,0.00040661186,0.00019070022,0.00019009187,0.00070623937,0.00035817944,0.00027099307,0.0047857803],"category_scores_gemma":[0.00012339352,0.00019758081,0.0003808723,0.00043107744,0.00010334899,0.0007129795,0.00026979818,0.00030734634,0.0014673609],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009574106,0.00019525655,0.0011005924,0.000702131,0.00006301473,0.0002365038,0.0001331461,0.5051932,0.049262088,0.05339549,0.027190162,0.3624327],"study_design_scores_gemma":[0.000015793905,0.00017213922,0.001415164,0.00013226067,0.000056275094,0.00026617086,0.00011977689,0.8512674,0.018725986,0.021212658,0.10658003,0.000036245405],"about_ca_topic_score_codex":0.0009561208,"about_ca_topic_score_gemma":0.002046315,"teacher_disagreement_score":0.0047857803,"about_ca_system_score_codex":0.00030444085,"about_ca_system_score_gemma":0.00024059447,"threshold_uncertainty_score":0.016009986},"labels":[],"label_agreement":null},{"id":"W3169256824","doi":"","title":"Energy Commitment: A Planning of Energy Carrier Based on Energy Consumption","year":2019,"lang":"en","type":"article","venue":"The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Energy consumption; Energy (signal processing); Energy carrier; Energy accounting; Energy engineering; Energy balance; Energy supply; Environmental economics; Efficient energy use; Energy conservation; Energy policy; Renewable energy; Engineering; Economics; Electrical engineering; Physics","score_opus":0.04030061850477949,"score_gpt":0.2732418483253243,"score_spread":0.23294122982054477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169256824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026238542,0.0004271052,0.8405223,0.001160316,0.00010939894,0.0003277851,0.0005416419,0.00052429084,0.13014859],"genre_scores_gemma":[0.7647395,0.0010911861,0.19663982,0.00011432298,0.000037357066,0.00035196467,0.0006157228,0.00023153175,0.03617852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995034,0.00014921596,0.000020364045,0.00009535871,0.00017140439,0.000060156097],"domain_scores_gemma":[0.9997955,0.000057022495,0.000024615447,0.00002677923,0.00006883647,0.000027194817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005074271,0.00043334658,0.00027674172,0.00074609934,0.00059539283,0.0019878168,0.0009939423,0.0005162297,0.008843066],"category_scores_gemma":[0.0010313365,0.00025826754,0.0004264702,0.001135636,0.00060704956,0.002091546,0.0008722055,0.00061302184,0.0010323781],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006608882,0.000044533142,0.0016562047,0.000110498644,0.000020076259,0.00015635235,0.00022683112,0.47019517,0.0019516172,0.43808243,0.0062309983,0.08125915],"study_design_scores_gemma":[0.000020792195,0.000097124335,0.0012676967,0.000096501215,0.000029427056,0.00012459955,0.0005687402,0.7248973,0.0035234592,0.2105061,0.05881068,0.000057618396],"about_ca_topic_score_codex":0.00915199,"about_ca_topic_score_gemma":0.007746739,"teacher_disagreement_score":0.00915199,"about_ca_system_score_codex":0.0014313938,"about_ca_system_score_gemma":0.0027532529,"threshold_uncertainty_score":0.029582977},"labels":[],"label_agreement":null},{"id":"W3169346838","doi":"10.1016/j.apenergy.2021.117154","title":"A Proof-of-Stake public blockchain based pricing scheme for peer-to-peer energy trading","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Research Foundation Singapore; Agency for Science, Technology and Research","keywords":"Microgrid; Smart contract; Prosumer; Blockchain; Incentive; Distributed generation; Demand response; Business; Tariff; Database transaction; Payment; Computer science; Environmental economics; Computer security; Microeconomics; Economics; Power (physics); Electricity; Finance; Control (management); Engineering","score_opus":0.018635455037880593,"score_gpt":0.20928338141605082,"score_spread":0.19064792637817024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169346838","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044647083,0.00042993826,0.93532497,0.0010669044,0.00041113375,0.00054942054,0.0004573639,0.0015783585,0.015534793],"genre_scores_gemma":[0.91874003,0.00020495996,0.07123883,0.00015537742,0.00008193658,0.0001725694,0.00030835625,0.000079955746,0.009017977],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99720013,0.00080174045,0.00016321443,0.00035238857,0.001074404,0.0004081188],"domain_scores_gemma":[0.9966897,0.001091037,0.00017051354,0.0010825233,0.00062876276,0.0003374649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019972355,0.00043975134,0.001538418,0.00043473905,0.0013175801,0.0018581508,0.0026832765,0.0022234588,0.011122967],"category_scores_gemma":[0.0061994703,0.00037795145,0.00048713406,0.0009951598,0.0012442921,0.0038815364,0.004157308,0.0018934555,0.002240254],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024231996,0.0009372893,0.0012609769,0.00050975214,0.0001549463,0.001235856,0.00044055667,0.21466538,0.034645926,0.4221133,0.025998192,0.2956146],"study_design_scores_gemma":[0.00020755318,0.00020902528,0.00020072648,0.000025262856,0.000026393942,0.0003563672,0.000059376693,0.8445943,0.006698906,0.13885437,0.008712778,0.00005488535],"about_ca_topic_score_codex":0.0013443705,"about_ca_topic_score_gemma":0.0018696826,"teacher_disagreement_score":0.011122967,"about_ca_system_score_codex":0.00090315414,"about_ca_system_score_gemma":0.002621578,"threshold_uncertainty_score":0.037210047},"labels":[],"label_agreement":null},{"id":"W3169704021","doi":"10.5267/j.ijiec.2021.5.005","title":"An explicit evolutionary approach for multiobjective energy consumption planning considering user preferences in smart homes","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Junta de Andalucía; Universidad de la República Uruguay; Universidad Nacional del Sur; Consejo Nacional de Investigaciones Científicas y Técnicas; European Commission; Ministerio de Ciencia e Innovación; Universidad de Málaga; Agencia Nacional de Investigación e Innovación","keywords":"Electricity; Schedule; Computer science; Context (archaeology); Mains electricity; Consumption (sociology); Greedy algorithm; Multi-objective optimization; Evolutionary algorithm; Energy consumption; Set (abstract data type); Service (business); Mathematical optimization; Operations research; Engineering; Machine learning; Business; Algorithm; Marketing; Mathematics","score_opus":0.0487435928434825,"score_gpt":0.2714859075735069,"score_spread":0.22274231473002437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169704021","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089953855,0.00025961862,0.90563506,0.00018451936,0.000024608682,0.000059923583,0.00004104055,0.000090948124,0.003750412],"genre_scores_gemma":[0.7996912,0.00021894502,0.19723764,0.00008747971,0.000020064648,0.00016252235,0.00006780271,0.000034413966,0.0024799418],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967265,0.00016717623,0.00001115953,0.000037463058,0.000063911524,0.000047586098],"domain_scores_gemma":[0.9994248,0.0004228022,0.000046539393,0.000022618284,0.0000568603,0.000026413385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008765553,0.0005958118,0.00072261185,0.00047474768,0.00030713168,0.00063042424,0.0008592174,0.0009858283,0.0011901396],"category_scores_gemma":[0.0017983237,0.000413831,0.00057403557,0.0005975495,0.00042919844,0.0005604511,0.0005448125,0.00063226884,0.00010042438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000102906015,0.000017381455,0.00023730223,0.000012783494,0.000011512899,0.000038137867,0.000019234656,0.98999035,0.00030793034,0.0028157195,0.00008702074,0.0064523863],"study_design_scores_gemma":[0.000002782085,0.000010006279,0.000055510205,0.0000024645276,0.0000028006393,0.000006792369,0.0000065764307,0.9988533,0.000083455154,0.00086145,0.000113097165,0.0000016782768],"about_ca_topic_score_codex":0.0047082226,"about_ca_topic_score_gemma":0.0043245894,"teacher_disagreement_score":0.0047082226,"about_ca_system_score_codex":0.0004889316,"about_ca_system_score_gemma":0.0006990876,"threshold_uncertainty_score":0.009361625},"labels":[],"label_agreement":null},{"id":"W3170479104","doi":"10.1016/j.seta.2021.101370","title":"A review on virtual power plant for energy management","year":2021,"lang":"en","type":"review","venue":"Sustainable Energy Technologies and Assessments","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Scheduling (production processes); Reinforcement learning; Virtual power plant; Scalability; Renewable energy; Artificial intelligence; Distributed computing; Risk analysis (engineering); Operations research; Engineering; Distributed generation; Operations management","score_opus":0.015012249814634088,"score_gpt":0.28247129065301335,"score_spread":0.26745904083837924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170479104","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000111601286,0.9971853,0.00029156404,0.00022475985,0.00032757333,0.000011930208,0.000054793763,0.000008794611,0.0017836497],"genre_scores_gemma":[0.0010364028,0.997124,0.00043115224,0.00036469847,0.00022202113,0.000012204201,0.00006415875,0.0000037669477,0.00074146286],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996351,0.0000850101,0.00006342382,0.000059790287,0.00012895958,0.00002771812],"domain_scores_gemma":[0.99921024,0.000428446,0.00014443921,0.0000271088,0.00015571884,0.000033993234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006819122,0.0011101331,0.001609505,0.0039557153,0.00025720327,0.0012494505,0.0008292079,0.0011779486,0.008582195],"category_scores_gemma":[0.0016157058,0.0003457534,0.0008565318,0.004740626,0.00039927685,0.0019711948,0.00086030574,0.0010375516,0.0015373044],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007117063,0.00005824915,0.00010280405,0.051844522,0.00014433147,0.00011901062,0.000036665177,0.00056902226,0.0011398895,0.003336628,0.036468513,0.90610915],"study_design_scores_gemma":[0.00002913123,0.00014645024,0.0006238156,0.013551211,0.00037694967,0.00045245912,0.000049688766,0.0001746914,0.00040675755,0.0020270452,0.9821363,0.00002546368],"about_ca_topic_score_codex":0.001406,"about_ca_topic_score_gemma":0.0033077898,"teacher_disagreement_score":0.008582195,"about_ca_system_score_codex":0.0005599847,"about_ca_system_score_gemma":0.0019440444,"threshold_uncertainty_score":0.028710306},"labels":[],"label_agreement":null},{"id":"W3170912669","doi":"10.1016/j.cor.2021.105366","title":"Revenue optimization in energy networks involving self-scheduled demand and a smart grid","year":2021,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Polytechnique Montréal; Université du Québec à Montréal","funders":"","keywords":"Bilevel optimization; Heuristics; Computer science; Mathematical optimization; Smart grid; Computation; Load balancing (electrical power); Heuristic; Grid; Integer (computer science); Revenue; Optimization problem; Algorithm; Mathematics","score_opus":0.018142100342238402,"score_gpt":0.25707757239183904,"score_spread":0.23893547204960064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170912669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36797714,0.0028508862,0.57337815,0.0054237186,0.00056812406,0.0002545001,0.0006218492,0.0004082444,0.04851741],"genre_scores_gemma":[0.9815812,0.0005123564,0.010013702,0.00009018306,0.00009106755,0.00003478147,0.00006615986,0.000060214832,0.0075502694],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916184,0.00048284588,0.00001953507,0.000087931,0.00008841645,0.00015951018],"domain_scores_gemma":[0.9965004,0.0027865344,0.00022411313,0.00008383917,0.00022542306,0.00017960624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002154069,0.000734583,0.0014837232,0.0006772113,0.000558071,0.0021741746,0.0014916124,0.0011619244,0.0041092327],"category_scores_gemma":[0.006802559,0.0008202489,0.0005498064,0.0011092747,0.0012679452,0.0025252698,0.00105469,0.0014085672,0.0002791465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001676664,0.000069405476,0.00032952763,0.000063150605,0.00002505739,0.00013897792,0.000029478177,0.94030726,0.00041106052,0.05096402,0.0022225091,0.005271906],"study_design_scores_gemma":[0.000014451985,0.000022508644,0.00008539176,0.0000053439007,0.0000067234323,0.00002560673,0.000025659996,0.9844518,0.000104661885,0.014967038,0.00028494882,0.0000058203996],"about_ca_topic_score_codex":0.0053585665,"about_ca_topic_score_gemma":0.0051087025,"teacher_disagreement_score":0.0053585665,"about_ca_system_score_codex":0.0021115688,"about_ca_system_score_gemma":0.0012357567,"threshold_uncertainty_score":0.015320599},"labels":[],"label_agreement":null},{"id":"W3173438469","doi":"10.1109/access.2022.3156581","title":"Building Energy Management With Reinforcement Learning and Model Predictive Control: A Survey","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Model predictive control; Reinforcement learning; Computer science; Energy management; Building automation; Building management system; Efficient energy use; Renewable energy; Automation; Control (management); Energy (signal processing); Artificial intelligence; Engineering","score_opus":0.011092185197433609,"score_gpt":0.22536787029738128,"score_spread":0.21427568509994768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173438469","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0043721963,0.78628165,0.18444404,0.0010163117,0.0005935311,0.00009040719,0.00013063745,0.0003620239,0.022709131],"genre_scores_gemma":[0.1070126,0.84180284,0.042093277,0.00044998742,0.0020202512,0.00015969323,0.00036804177,0.0000906882,0.0060026734],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99963915,0.00006144588,0.000038708513,0.00009090955,0.00014646258,0.000023251025],"domain_scores_gemma":[0.9996063,0.00023958914,0.00003464226,0.000028491624,0.00007660577,0.000014343536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048416023,0.0010647532,0.0013562023,0.0011157369,0.00024790654,0.0016093174,0.0010894155,0.0011323171,0.002498921],"category_scores_gemma":[0.0008886047,0.00041998323,0.0007606427,0.002651986,0.00045959497,0.0015697387,0.0008111699,0.0009831314,0.00094309385],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006171141,0.00017057343,0.0008627485,0.006822954,0.00012720603,0.00012571577,0.00010032172,0.06879658,0.0014640689,0.02826278,0.008704635,0.8845008],"study_design_scores_gemma":[0.000053971515,0.0007047283,0.0032505423,0.003593996,0.00032398308,0.0009678304,0.00029193424,0.35966736,0.0043631946,0.066150814,0.56043315,0.00019858165],"about_ca_topic_score_codex":0.0017142596,"about_ca_topic_score_gemma":0.0010644703,"teacher_disagreement_score":0.002498921,"about_ca_system_score_codex":0.00044057937,"about_ca_system_score_gemma":0.0006078511,"threshold_uncertainty_score":0.00835973},"labels":[],"label_agreement":null},{"id":"W31747851","doi":"10.1080/10826084.2019.1691594","title":"A simulation tool for demand response programs implementation","year":2012,"lang":"en","type":"article","venue":"Substance Use & Misuse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Computer science; Reliability (semiconductor); Point (geometry); Operations research; Simulation; Engineering","score_opus":0.03723178800602019,"score_gpt":0.2966599518948751,"score_spread":0.2594281638888549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W31747851","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06909374,0.0003997065,0.58953965,0.0042081736,0.0018110585,0.0048416615,0.07558826,0.0682058,0.18631199],"genre_scores_gemma":[0.3208241,0.0005985292,0.5915864,0.0010030874,0.000169172,0.009977923,0.031526726,0.0056194314,0.038694717],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903935,0.00044599423,0.000101482205,0.00013761767,0.00015617433,0.00011938941],"domain_scores_gemma":[0.99159604,0.0065292283,0.00021342254,0.0004262562,0.00096256676,0.0002725793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034248207,0.001080818,0.00062135793,0.0010736039,0.00069473503,0.001860797,0.0023586561,0.0013329483,0.12050805],"category_scores_gemma":[0.013912286,0.0006589272,0.0013081247,0.0011308538,0.00033795575,0.0013814186,0.0015374273,0.0018288324,0.008772162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012494016,0.0018584436,0.019950783,0.0015908865,0.00042233287,0.00065738073,0.0015453775,0.4663487,0.0016907209,0.074943416,0.25523946,0.17450313],"study_design_scores_gemma":[0.0006534795,0.00020439646,0.0019504951,0.0003549596,0.00011373632,0.00007570247,0.00058861525,0.8187358,0.0013679295,0.02714536,0.14874573,0.00006387384],"about_ca_topic_score_codex":0.018797966,"about_ca_topic_score_gemma":0.019136626,"teacher_disagreement_score":0.12050805,"about_ca_system_score_codex":0.0012563984,"about_ca_system_score_gemma":0.0028894204,"threshold_uncertainty_score":0.4031396},"labels":[],"label_agreement":null},{"id":"W3175263299","doi":"10.82308/20790","title":"Weighted scalarization versus compromise solution in multi-objective economic dispatch for microgrids","year":2017,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Compromise; Economic dispatch; Mathematical optimization; Economics; Econometrics; Computer science; Mathematics; Electric power system","score_opus":0.025110993432655982,"score_gpt":0.24308809033177814,"score_spread":0.21797709689912215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175263299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051487457,0.00041797233,0.9439247,0.0001946763,0.00004502484,0.000093477276,0.00002296293,0.00011339589,0.0037002868],"genre_scores_gemma":[0.7926982,0.00035801652,0.20461811,0.00007831595,0.000032422617,0.00014953199,0.00004216187,0.00007001663,0.0019532451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992336,0.00045275126,0.000030128096,0.00007921226,0.00015918001,0.000045196713],"domain_scores_gemma":[0.9985721,0.0010363477,0.00015670253,0.00005510926,0.00013898985,0.000040781226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029511198,0.001083014,0.0009111979,0.00062377995,0.0003501055,0.0009767025,0.0006725627,0.00073205604,0.001532887],"category_scores_gemma":[0.005065607,0.00035369006,0.0005651954,0.00072457304,0.00060979876,0.0013760364,0.0010565238,0.0009613709,0.00017298722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049179118,0.000024050507,0.00016831458,0.00004185049,0.000029405706,0.000017353968,0.000027446744,0.97589797,0.0007455362,0.006162243,0.0001019429,0.016734803],"study_design_scores_gemma":[0.0000060270863,0.000053420485,0.000055805398,0.000006063841,0.0000058072583,0.0000051248,0.000009710056,0.9971662,0.00030865718,0.0021941462,0.00018524613,0.000003636121],"about_ca_topic_score_codex":0.0010444039,"about_ca_topic_score_gemma":0.00095545105,"teacher_disagreement_score":0.0029511198,"about_ca_system_score_codex":0.0006715309,"about_ca_system_score_gemma":0.00058772526,"threshold_uncertainty_score":0.015607178},"labels":[],"label_agreement":null},{"id":"W3175609235","doi":"10.32920/ryerson.14665608.v1","title":"Load balancing for smart grid: centralized and distributed approaches","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Load balancing (electrical power); Smart grid; Computer science; Distributed computing; Grid; Scheduling (production processes); Electric power system; Distributed generation; Jacobian matrix and determinant; Load management; Demand response; Electric power; Power (physics); Mathematical optimization; Electrical engineering; Electricity; Engineering; Renewable energy; Mathematics","score_opus":0.027528562968528784,"score_gpt":0.20306941434108325,"score_spread":0.17554085137255446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175609235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004790509,0.0049010385,0.9763105,0.00095140625,0.00021287211,0.00004714406,0.000025649437,0.00019084607,0.012570065],"genre_scores_gemma":[0.8047765,0.008611031,0.17020816,0.00046692425,0.0012553908,0.00018784075,0.000119512195,0.00013801354,0.014236523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993668,0.00018800648,0.000026336671,0.00014114956,0.00022754102,0.00005012323],"domain_scores_gemma":[0.9996754,0.00011460131,0.000046985875,0.000059540052,0.00008323186,0.000020390133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008291526,0.0006100467,0.000836466,0.00039246096,0.00045628523,0.001904779,0.001044486,0.0011076803,0.0028552169],"category_scores_gemma":[0.0010031927,0.00028585078,0.0004238286,0.0009871878,0.0008718058,0.0020766943,0.001128108,0.0012051171,0.000523911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090628164,0.000105305706,0.0004807691,0.0004230005,0.000067935965,0.00016214936,0.00015176175,0.46662158,0.0046379785,0.28135037,0.007208304,0.2387003],"study_design_scores_gemma":[0.000022369548,0.000051476287,0.0001565376,0.0000358236,0.000017227703,0.00006865479,0.00005613807,0.88533646,0.0009746727,0.10148125,0.011784637,0.000014798445],"about_ca_topic_score_codex":0.0011396355,"about_ca_topic_score_gemma":0.00123414,"teacher_disagreement_score":0.0028552169,"about_ca_system_score_codex":0.00087637955,"about_ca_system_score_gemma":0.00076101464,"threshold_uncertainty_score":0.009551644},"labels":[],"label_agreement":null},{"id":"W3176136760","doi":"10.1145/3447555.3464856","title":"Disaggregating Solar Generation Using Smart Meter Data and Proxy Measurements from Neighbouring Sites","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"AKA; Proxy (statistics); Software deployment; Smart meter; Metre; Computer science; Real-time computing; Environmental science; Smart grid; Engineering; Electrical engineering; Operating system","score_opus":0.11276479485679682,"score_gpt":0.2579790024485769,"score_spread":0.1452142075917801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3176136760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62585986,0.00083915784,0.36543423,0.00030416102,0.00014411854,0.00007777067,0.0016458941,0.001963223,0.003731613],"genre_scores_gemma":[0.9723893,0.00014639265,0.02602762,0.000035386438,0.000041765255,0.000013710366,0.000935178,0.00003713956,0.00037353561],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995579,0.00011096409,0.000043118667,0.00014289684,0.00010987472,0.0000352327],"domain_scores_gemma":[0.9992748,0.0002039082,0.0001236682,0.00025673516,0.00011164098,0.000029255627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053653127,0.0006780638,0.0007782128,0.00076896284,0.00018232349,0.000817165,0.0005335858,0.0004120688,0.00037881194],"category_scores_gemma":[0.0027094807,0.00028579382,0.0003815659,0.0013547105,0.00016441982,0.000992468,0.00060668483,0.00042579733,0.00033206725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004094267,0.00017968233,0.08480723,0.0003619441,0.0004054658,0.0005764364,0.000464118,0.5427886,0.03210315,0.0026452646,0.0030535527,0.3322051],"study_design_scores_gemma":[0.00002118747,0.000034674373,0.022617893,0.000017405566,0.000042601427,0.00013336525,0.0001293068,0.9665681,0.0060969894,0.0022845324,0.0020345775,0.000019312967],"about_ca_topic_score_codex":0.0037333572,"about_ca_topic_score_gemma":0.0061558005,"teacher_disagreement_score":0.0037333572,"about_ca_system_score_codex":0.0002706409,"about_ca_system_score_gemma":0.00026634353,"threshold_uncertainty_score":0.0074232817},"labels":[],"label_agreement":null},{"id":"W3179133810","doi":"10.1109/iccworkshops50388.2021.9473855","title":"Cost-Aware Dynamic Bayesian Coalitional Game for Energy Trading among Microgrids","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Computer science; Mathematical optimization; Game theory; Scheme (mathematics); Electricity; Minification; Energy (signal processing); Electricity generation; Peer-to-peer; Operations research; Microeconomics; Distributed computing; Economics; Artificial intelligence; Engineering; Mathematics; Power (physics); Control (management)","score_opus":0.01148920758937447,"score_gpt":0.2197321498076911,"score_spread":0.20824294221831663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3179133810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047831822,0.0002625399,0.9440566,0.00036852772,0.000054168253,0.00011895335,0.000095893585,0.00015071798,0.007060821],"genre_scores_gemma":[0.95432097,0.0001771175,0.042142,0.00009487599,0.000021479744,0.00011029911,0.00006815503,0.000027388776,0.0030377172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989619,0.00045857043,0.00003405275,0.00012812387,0.00026353146,0.00015379101],"domain_scores_gemma":[0.9981558,0.0011512232,0.0001803208,0.00008293289,0.00024282713,0.00018693156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017421584,0.0009591696,0.0014677466,0.0004356316,0.0005831028,0.001085992,0.0017962945,0.0010891582,0.002638096],"category_scores_gemma":[0.0042105466,0.00041068642,0.00060903095,0.0005954102,0.0009218674,0.0016576233,0.0014084345,0.0014276311,0.00025370438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012282432,0.00006792571,0.0004085729,0.000044981607,0.00003479146,0.000092419665,0.00005810099,0.9611126,0.00091731374,0.024910195,0.00076776627,0.011462585],"study_design_scores_gemma":[0.000007698756,0.000014352627,0.00004203148,0.000001997407,0.000003829147,0.000009464169,0.000007854623,0.99489707,0.000081807935,0.00477116,0.00015942437,0.0000033558786],"about_ca_topic_score_codex":0.0075900597,"about_ca_topic_score_gemma":0.007925477,"teacher_disagreement_score":0.0075900597,"about_ca_system_score_codex":0.0016066029,"about_ca_system_score_gemma":0.001742802,"threshold_uncertainty_score":0.015091777},"labels":[],"label_agreement":null},{"id":"W3179183900","doi":"10.1016/j.knosys.2021.107293","title":"Edge and fog computing using IoT for direct load optimization and control with flexibility services for citizen energy communities","year":2021,"lang":"en","type":"article","venue":"Knowledge-Based Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Colegiul Consultativ pentru Cercetare-Dezvoltare şi Inovare; Unitatea Executiva pentru Finantarea Invatamantului Superior, a Cercetarii, Dezvoltarii si Inovarii; Ontario Ministry of Research, Innovation and Science","keywords":"Smart grid; Flexibility (engineering); Computer science; Demand response; Bidding; Electricity; Edge computing; Grid; Enhanced Data Rates for GSM Evolution; Distributed computing; Engineering; Telecommunications; Business; Electrical engineering","score_opus":0.018152582033766816,"score_gpt":0.22693335887161578,"score_spread":0.20878077683784896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3179183900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3304933,0.00069478154,0.58750457,0.0012948293,0.00054080493,0.00017705653,0.00026864678,0.0017205072,0.07730544],"genre_scores_gemma":[0.978682,0.000084941814,0.018005976,0.00015665054,0.000024216888,0.00001737669,0.00006295506,0.00003008393,0.0029356938],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998223,0.000030782692,0.0000065000468,0.000040463012,0.00004464697,0.000055221633],"domain_scores_gemma":[0.99984,0.000036746467,0.000011898392,0.000037124028,0.000045456127,0.000028732733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021429805,0.0002951411,0.00028732323,0.00022201825,0.00063463306,0.0011289336,0.00056495785,0.00047520522,0.0017568475],"category_scores_gemma":[0.00038649776,0.00012682565,0.00029748926,0.00038205765,0.00031026304,0.0012969312,0.0010194824,0.0005384735,0.00027928388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001553481,0.0015111224,0.015167915,0.0002812595,0.00024868842,0.0018885419,0.0011899524,0.16595908,0.076622,0.09902,0.03317242,0.60338557],"study_design_scores_gemma":[0.000032557644,0.00014167301,0.0037206118,0.000028950877,0.000057456728,0.00022532897,0.0006314345,0.92012477,0.0144299,0.043120585,0.017448017,0.00003868167],"about_ca_topic_score_codex":0.0033031695,"about_ca_topic_score_gemma":0.00892625,"teacher_disagreement_score":0.0033031695,"about_ca_system_score_codex":0.00029417415,"about_ca_system_score_gemma":0.0005309284,"threshold_uncertainty_score":0.0065678954},"labels":[],"label_agreement":null},{"id":"W3180975163","doi":"10.3390/electronics10141618","title":"Autonomous Fuzzy Controller Design for the Utilization of Hybrid PV-Wind Energy Resources in Demand Side Management Environment","year":2021,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"National Research Foundation of Korea; Chung-Ang University; Taif University; National Research Foundation","keywords":"Photovoltaic system; Renewable energy; Automotive engineering; Controller (irrigation); Energy management; Computer science; Wind power; Engineering; Simulation; Energy (signal processing); Electrical engineering","score_opus":0.011376283698343677,"score_gpt":0.19104692904009596,"score_spread":0.17967064534175228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3180975163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058436226,0.00032767092,0.93066555,0.00008735241,0.00009740778,0.000120309174,0.00005462893,0.0004895717,0.009721294],"genre_scores_gemma":[0.9538211,0.00009214541,0.0439705,0.000033137283,0.000018906081,0.00010751439,0.000038273258,0.000014229581,0.0019041013],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998192,0.000022941884,0.000011474153,0.00005566073,0.000063662825,0.000027162077],"domain_scores_gemma":[0.99985266,0.000032848286,0.00002503904,0.000010726783,0.000069759226,0.0000089500245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023892251,0.00037828303,0.00033437612,0.00019965201,0.00037235254,0.00066753424,0.00069965847,0.00040894948,0.0011837273],"category_scores_gemma":[0.00036239272,0.00018539962,0.00032907078,0.00012779354,0.00019960711,0.0002562399,0.0002634191,0.00038773887,0.00022068778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027866018,0.00015114284,0.001531767,0.00030499566,0.00011498385,0.00028593873,0.00025040022,0.76193756,0.0743429,0.009154631,0.0015108008,0.15013613],"study_design_scores_gemma":[0.000020308707,0.00010261496,0.00033657125,0.000007426289,0.000017789378,0.000037352325,0.000017412887,0.99268335,0.0050218944,0.00049084146,0.001256798,0.00000764292],"about_ca_topic_score_codex":0.004264074,"about_ca_topic_score_gemma":0.0051432303,"teacher_disagreement_score":0.004264074,"about_ca_system_score_codex":0.00035414184,"about_ca_system_score_gemma":0.00058210193,"threshold_uncertainty_score":0.008478522},"labels":[],"label_agreement":null},{"id":"W3182429186","doi":"10.32920/ryerson.14665155.v1","title":"A multi-level optimization technique for electricity consumption management and pricing in residential neighborhoods","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Smart grid; Energy management; Demand response; Revenue; Energy consumption; Electricity; Environmental economics; Operations research; Risk analysis (engineering); Business; Energy (signal processing); Engineering; Economics","score_opus":0.02948659525984441,"score_gpt":0.2543964155637073,"score_spread":0.2249098203038629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182429186","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003333562,0.00006735495,0.99420196,0.000094829586,0.000017426024,0.000023831026,0.000016188498,0.00007982878,0.0021649587],"genre_scores_gemma":[0.40319455,0.00030100867,0.5888378,0.00016380625,0.0000717593,0.00028269034,0.00009365453,0.00015681057,0.0068979454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994611,0.00026508738,0.000017648128,0.00007773357,0.00013019376,0.000048241065],"domain_scores_gemma":[0.9996902,0.0001662034,0.00003781477,0.000025180509,0.00006100728,0.00001971217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00118641,0.0007020697,0.00075714,0.00044149382,0.0004986138,0.0010345028,0.00089220534,0.00066892285,0.0031136924],"category_scores_gemma":[0.0018998402,0.00050381914,0.0009514521,0.00068896683,0.0004924754,0.0010295425,0.0010250713,0.0012873331,0.00049791636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029537778,0.000040401243,0.0003465168,0.00005014402,0.000029721048,0.00004154588,0.00005469865,0.93096507,0.001497096,0.04049133,0.00121611,0.025237815],"study_design_scores_gemma":[0.0000017501349,0.000009115904,0.000028323486,0.0000018944849,0.0000020946572,0.0000033972547,0.0000037026618,0.9968957,0.00009386873,0.0026270298,0.00033176303,0.0000014004044],"about_ca_topic_score_codex":0.004180421,"about_ca_topic_score_gemma":0.004549231,"teacher_disagreement_score":0.004180421,"about_ca_system_score_codex":0.0008973518,"about_ca_system_score_gemma":0.0010307123,"threshold_uncertainty_score":0.010416329},"labels":[],"label_agreement":null},{"id":"W3182738738","doi":"10.1109/tase.2021.3091334","title":"<i>Q</i>-Learning-Based Model Predictive Control for Energy Management in Residential Aggregator","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Automation Science and Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Polytechnique Montréal","funders":"","keywords":"News aggregator; Demand response; Model predictive control; Computer science; Integer programming; Mathematical optimization; Engineering; Electricity; Control (management); Artificial intelligence; Algorithm; Mathematics; Electrical engineering","score_opus":0.0060355413539471625,"score_gpt":0.2008007432666064,"score_spread":0.19476520191265925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182738738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02692508,0.00028857653,0.9585835,0.0005572849,0.000084764906,0.000045890847,0.000068332956,0.0005336223,0.012912971],"genre_scores_gemma":[0.97154015,0.0001894131,0.021545354,0.00011177154,0.000044662567,0.00009007832,0.00006606991,0.000038565664,0.0063739517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997582,0.00006417652,0.000010801773,0.000054727596,0.000068265406,0.000043767504],"domain_scores_gemma":[0.99979347,0.000069466914,0.000040030707,0.000016641368,0.00006935571,0.000011027063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045250193,0.0004878369,0.00054813246,0.00017398072,0.00041180724,0.00088225235,0.0007623299,0.0006499605,0.0023652327],"category_scores_gemma":[0.0007759646,0.00020581795,0.0004079603,0.00035776972,0.0004956973,0.000439392,0.0006517237,0.0009054565,0.00033577162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019052695,0.00001717855,0.00017236176,0.000018320075,0.000009925538,0.000037343234,0.000019546434,0.9862345,0.0005569337,0.00396084,0.00054963585,0.008404412],"study_design_scores_gemma":[0.0000014442929,0.0000049061514,0.000025462135,8.7401185e-7,0.0000011504819,0.0000016916473,0.000001310339,0.9992704,0.00006716484,0.0004896209,0.00013505176,9.222957e-7],"about_ca_topic_score_codex":0.022116821,"about_ca_topic_score_gemma":0.01229621,"teacher_disagreement_score":0.022116821,"about_ca_system_score_codex":0.0008047459,"about_ca_system_score_gemma":0.0008481179,"threshold_uncertainty_score":0.043976128},"labels":[],"label_agreement":null},{"id":"W3184507390","doi":"10.1016/j.est.2021.102915","title":"Realistic coordination and sizing of a solar array combined with pumped hydro storage system","year":2021,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Yarmouk University","keywords":"Sizing; Photovoltaic system; Solar irradiance; Power (physics); Renewable energy; Reliability (semiconductor); Reliability engineering; Particle swarm optimization; Environmental science; Computer science; Net present value; Automotive engineering; Process engineering; Engineering; Electrical engineering; Production (economics); Meteorology; Physics; Chemistry; Algorithm","score_opus":0.006034146673992005,"score_gpt":0.17856696763064997,"score_spread":0.17253282095665795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184507390","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91271716,0.00021172487,0.04655325,0.00079016533,0.00014630618,0.00009911418,0.00075555523,0.000334586,0.03839214],"genre_scores_gemma":[0.9983222,0.000010982646,0.00087844755,0.0000082359675,0.0000035048993,0.000007522679,0.000022365784,0.0000059978483,0.0007408661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998565,0.000049064147,0.0000061134997,0.000030326091,0.000025603335,0.000032358214],"domain_scores_gemma":[0.99952376,0.00026528785,0.000055881777,0.000032272877,0.0000661704,0.000056661087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030431402,0.00042793975,0.000753042,0.00023414163,0.0005467755,0.0009322962,0.000611444,0.0012754101,0.0041232007],"category_scores_gemma":[0.0010483924,0.00049927563,0.00039310238,0.00036458223,0.00060346053,0.0006950357,0.00046596042,0.0006427345,0.00018516748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000062378036,0.000015993839,0.00035699093,0.000012765344,0.000008235883,0.00013695064,0.000010771027,0.9972699,0.00052327703,0.00090035604,0.00017425681,0.00052803685],"study_design_scores_gemma":[0.000015962523,0.000024147557,0.0002725288,9.1101685e-7,0.000005439056,0.000008853416,0.000017219769,0.9990796,0.00012664017,0.00038821614,0.00005747043,0.0000030738668],"about_ca_topic_score_codex":0.014113129,"about_ca_topic_score_gemma":0.011525639,"teacher_disagreement_score":0.014113129,"about_ca_system_score_codex":0.0008526735,"about_ca_system_score_gemma":0.00067052396,"threshold_uncertainty_score":0.028061986},"labels":[],"label_agreement":null},{"id":"W3186065431","doi":"10.1115/1.4051735","title":"Economic Control for a Residential Photovoltaic-Battery System by Combining Stochastic Model Predictive Control and Improved Correction Strategy","year":2021,"lang":"en","type":"article","venue":"Journal of Energy Resources Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"National Natural Science Foundation of China","keywords":"Photovoltaic system; Stand-alone power system; Model predictive control; Computer science; Electricity; Automotive engineering; Electricity generation; Grid-connected photovoltaic power system; Grid; Limit (mathematics); Electric power system; Maximum power point tracking; Power (physics); Reliability engineering; Renewable energy; Distributed generation; Control theory (sociology); Control (management); Engineering; Electrical engineering; Voltage; Mathematics","score_opus":0.0031837489399020426,"score_gpt":0.17759564743151574,"score_spread":0.1744118984916137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186065431","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27720514,0.0005979505,0.70700395,0.00078584073,0.00013260127,0.00014234631,0.00009977361,0.0007016514,0.013330757],"genre_scores_gemma":[0.9968988,0.00004027035,0.0024952122,0.000018504172,0.000008340054,0.000019791192,0.00000950864,0.000003454393,0.0005062963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996426,0.0001008043,0.000020534826,0.00006875777,0.00010547559,0.00006187536],"domain_scores_gemma":[0.99960655,0.00016337035,0.00008331912,0.000020514042,0.000109374574,0.000016906106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006672149,0.00072773924,0.00062200846,0.00031598078,0.00054297695,0.00094423076,0.00066698703,0.000603234,0.0009723113],"category_scores_gemma":[0.00087229937,0.00029057887,0.00046381296,0.00035841632,0.0004488715,0.00035502258,0.0005274204,0.000561963,0.000102496124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007055033,0.000039019225,0.00038381462,0.00003377744,0.000022681212,0.00007778267,0.000022897722,0.9864813,0.0021000903,0.0012423563,0.00024186392,0.009283873],"study_design_scores_gemma":[0.000005124806,0.000023231389,0.000081712584,0.0000010654292,0.0000045656366,0.0000033431368,0.0000021454612,0.99950767,0.00019305112,0.00013307163,0.00004303209,0.000001957142],"about_ca_topic_score_codex":0.015062989,"about_ca_topic_score_gemma":0.010155858,"teacher_disagreement_score":0.015062989,"about_ca_system_score_codex":0.0008912019,"about_ca_system_score_gemma":0.0007829004,"threshold_uncertainty_score":0.029950619},"labels":[],"label_agreement":null},{"id":"W3187350720","doi":"10.1016/j.enbuild.2021.111330","title":"Impacts of COVID-19 related stay-at-home restrictions on residential electricity use and implications for future grid stability","year":2021,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Building Technologies Office; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy","keywords":"Electricity; Metropolitan area; Mains electricity; Work (physics); Coronavirus disease 2019 (COVID-19); Peak demand; Consumption (sociology); Quarter (Canadian coin); Environmental economics; Environmental science; Business; Engineering; Geography; Economics; Medicine","score_opus":0.014407173973875404,"score_gpt":0.2336073233555749,"score_spread":0.21920014938169952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3187350720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94031304,0.00018938136,0.00084710034,0.0022235648,0.000105225314,0.000053884654,0.004325569,0.000047807363,0.051894434],"genre_scores_gemma":[0.9902596,0.00009974914,0.00028580797,0.00032446202,0.000025478525,0.00003176677,0.0024820585,0.000020159498,0.006470936],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99837315,0.00024679326,0.00010347523,0.0001274024,0.00055732875,0.0005918118],"domain_scores_gemma":[0.9919252,0.0012521099,0.0019157089,0.0004049592,0.0030835287,0.0014185659],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016900364,0.00017009428,0.00028083654,0.00060572376,0.0012712145,0.0029191857,0.0011911965,0.00081415405,0.016659118],"category_scores_gemma":[0.0076772403,0.00016177919,0.00074222416,0.0009963989,0.0006332702,0.0011026604,0.0022127482,0.0014779768,0.0012614838],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018352997,0.0012918893,0.8643289,0.00014105857,0.0002140171,0.0011302257,0.001486042,0.01680024,0.002990669,0.04038445,0.02258636,0.046810783],"study_design_scores_gemma":[0.00004151454,0.00033536032,0.9490005,0.00013428024,0.000077463716,0.00034111284,0.008427304,0.009491846,0.0019750053,0.0036001857,0.026512848,0.00006265598],"about_ca_topic_score_codex":0.087697126,"about_ca_topic_score_gemma":0.17338148,"teacher_disagreement_score":0.087697126,"about_ca_system_score_codex":0.0039602513,"about_ca_system_score_gemma":0.0030552882,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W3188345843","doi":"10.11575/prism/36122","title":"Minimizing Demand Transmission Service Charges in Optimal Sizing and Scheduling Of Campus Microgrids","year":2019,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sizing; Scheduling (production processes); Service (business); Transmission (telecommunications); Operations research; Computer science; Engineering; Business; Operations management; Telecommunications; Marketing; Chemistry","score_opus":0.013499791928950646,"score_gpt":0.2530761061089705,"score_spread":0.23957631418001987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3188345843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3818303,0.00063994847,0.58168876,0.0005432066,0.000055021414,0.00022958429,0.00016793142,0.00025828418,0.034586973],"genre_scores_gemma":[0.93106323,0.0004480061,0.064303055,0.000020641875,0.000012777936,0.00007190006,0.000058900663,0.000039425457,0.003982096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984026,0.000064887456,0.000006278282,0.000023368462,0.000033540306,0.00003169799],"domain_scores_gemma":[0.9998919,0.000049272767,0.000019798317,0.00000787763,0.000019453546,0.000011747086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003831559,0.00043877694,0.00042637344,0.00025861917,0.00028242235,0.0010049653,0.0003104012,0.000304735,0.0018612497],"category_scores_gemma":[0.00082033535,0.00030363328,0.00029635636,0.0005146192,0.00022130008,0.00045758236,0.00039892303,0.0004593895,0.00020394492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003418057,0.000031119183,0.00034506802,0.00004468526,0.000010059627,0.00002609993,0.000043458727,0.9650021,0.0018196541,0.00719056,0.0003581055,0.025094809],"study_design_scores_gemma":[0.0000081244125,0.00006295138,0.00031376668,0.000008450391,0.000008989561,0.00000983234,0.00009336702,0.9937761,0.0016134838,0.0029334375,0.0011674112,0.0000041073063],"about_ca_topic_score_codex":0.006299378,"about_ca_topic_score_gemma":0.008842653,"teacher_disagreement_score":0.006299378,"about_ca_system_score_codex":0.0009181891,"about_ca_system_score_gemma":0.001720082,"threshold_uncertainty_score":0.012525439},"labels":[],"label_agreement":null},{"id":"W3188564586","doi":"10.1145/2796314.2745884","title":"Pricing Bilateral Electricity Trade between Smart Grids and Hybrid Green Datacenters","year":2015,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Computer science; Smart grid; Distributed generation; Scalability; Cloud computing; Mathematical optimization; Distributed computing; Robustness (evolution); Dynamic pricing; Electricity; Grid; Linearization; Nash equilibrium; Nonlinear system; Renewable energy; Engineering; Economics; Electrical engineering","score_opus":0.07899523997553501,"score_gpt":0.2913578760726048,"score_spread":0.21236263609706982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3188564586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41381127,0.00028772937,0.55275244,0.0012419996,0.00009858312,0.00013018906,0.00013528239,0.0003220221,0.031220518],"genre_scores_gemma":[0.9880762,0.00005329813,0.0099073695,0.000035573008,0.000009371859,0.000019028696,0.000016215065,0.000012061291,0.0018708234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932194,0.00032524313,0.000016365242,0.000091524336,0.00013554854,0.000109377754],"domain_scores_gemma":[0.9991472,0.0005186322,0.000084977844,0.000071567796,0.000082533494,0.00009516449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014316181,0.0004039553,0.0004806425,0.00022682374,0.00044794072,0.0018322765,0.00082353875,0.0009186083,0.0041783215],"category_scores_gemma":[0.0029594388,0.0002898943,0.00031335553,0.0004918027,0.00081371,0.0030484376,0.0012957095,0.00080251135,0.0002081066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021455498,0.000104576815,0.000908631,0.000049635884,0.000029857985,0.00019240343,0.000072341456,0.8420216,0.0021386193,0.124149896,0.0009880703,0.029129902],"study_design_scores_gemma":[0.000035284367,0.00006501112,0.00022742542,0.000005200872,0.000007549513,0.000029846235,0.00007814879,0.9450849,0.0008675054,0.052383162,0.0012077291,0.000008212201],"about_ca_topic_score_codex":0.0022478139,"about_ca_topic_score_gemma":0.0031150824,"teacher_disagreement_score":0.0041783215,"about_ca_system_score_codex":0.0015610214,"about_ca_system_score_gemma":0.0011624842,"threshold_uncertainty_score":0.013977885},"labels":[],"label_agreement":null},{"id":"W3190330924","doi":"10.1145/2637364.2591999","title":"Randomized auction design for electricity markets between grids and microgrids","year":2014,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Computer science; Double auction; Common value auction; Electricity; Mathematical optimization; Grid; Auction theory; Combinatorial auction; Reverse auction; Microeconomics; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.05328012082800311,"score_gpt":0.291645716438151,"score_spread":0.23836559561014792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3190330924","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023068009,0.00027778163,0.9694687,0.00045034004,0.000101421014,0.0002835601,0.00013507804,0.00029341463,0.005921655],"genre_scores_gemma":[0.73058003,0.00038372155,0.26106006,0.00029852305,0.00011124789,0.00057546544,0.0002088374,0.00013051099,0.0066516446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9945017,0.003454321,0.00021766972,0.0006165441,0.00073764496,0.00047208418],"domain_scores_gemma":[0.98958874,0.0070592584,0.0011296946,0.0008913469,0.0009016284,0.0004293699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073811435,0.00097483624,0.0017623202,0.0005748398,0.00067694194,0.0031548308,0.0029010784,0.0016811362,0.0065364437],"category_scores_gemma":[0.019276707,0.00088651583,0.0010035235,0.0008692758,0.0015155257,0.004141944,0.0016175545,0.0021225107,0.0008382043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003938708,0.0002486769,0.00044817667,0.00019819086,0.000079510646,0.00015228827,0.00007995738,0.8247585,0.0014957992,0.14586201,0.002396732,0.023886282],"study_design_scores_gemma":[0.00012892544,0.000096424585,0.00005932105,0.000008218529,0.0000147569,0.00004207042,0.000021106456,0.9545258,0.0003182808,0.043759003,0.0010138591,0.000012194785],"about_ca_topic_score_codex":0.0014359853,"about_ca_topic_score_gemma":0.0015281243,"teacher_disagreement_score":0.0073811435,"about_ca_system_score_codex":0.0019052948,"about_ca_system_score_gemma":0.003129467,"threshold_uncertainty_score":0.039035678},"labels":[],"label_agreement":null},{"id":"W3191309703","doi":"10.1109/icjece.2021.3091718","title":"Analysis of Key Performance Indicators for Local Electricity Markets’ Design","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Tariff; Incentive; Electricity; Remuneration; Electricity market; Environmental economics; Business; Work (physics); Consumption (sociology); Market share; Industrial organization; Microeconomics; Economics; Marketing; Finance; Engineering","score_opus":0.005136068738989218,"score_gpt":0.15328415259173198,"score_spread":0.14814808385274275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191309703","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93960834,0.00020076042,0.0498638,0.00015292023,0.000011336296,0.00010269389,0.00028105022,0.00023876863,0.009540341],"genre_scores_gemma":[0.9979023,0.000020979374,0.0016983703,0.0000049674704,0.0000018202676,0.000012344316,0.00008161216,0.0000124006465,0.00026532647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9987658,0.0006092696,0.00004265486,0.00015719503,0.0002150955,0.00020997941],"domain_scores_gemma":[0.9913168,0.005725366,0.0012156377,0.00045140318,0.0009748101,0.00031599333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033761489,0.00060098845,0.0005195529,0.0007864708,0.00023462545,0.0013987143,0.0005175501,0.00049760775,0.0033656769],"category_scores_gemma":[0.013675321,0.0001623138,0.00034034188,0.00074458297,0.00050289626,0.0012056367,0.00057944213,0.00041102566,0.00026164495],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032373788,0.00013059625,0.023174407,0.00011999476,0.00009947839,0.00015460858,0.00008221503,0.94748235,0.0035376674,0.0069117877,0.0006724972,0.017310658],"study_design_scores_gemma":[0.000022173466,0.00036426648,0.010971016,0.000012527268,0.000035968544,0.00007944373,0.00016018563,0.98180425,0.0034253022,0.0026244815,0.00048428882,0.000016196314],"about_ca_topic_score_codex":0.0017342163,"about_ca_topic_score_gemma":0.0011805479,"teacher_disagreement_score":0.0033761489,"about_ca_system_score_codex":0.0012087155,"about_ca_system_score_gemma":0.00053616473,"threshold_uncertainty_score":0.017855048},"labels":[],"label_agreement":null},{"id":"W3194896812","doi":"10.48336/jj7e-mk89","title":"Design of a photovoltaic system for a house in Pakistan and its open source ultra-low power data logger","year":2022,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Photovoltaic system; Microcontroller; Sleep mode; Real-time computing; Embedded system; Electrical engineering; Software; Data acquisition; Computer hardware; Engineering; Computer science; Power (physics); Automotive engineering; Operating system; Power consumption","score_opus":0.039164272006618935,"score_gpt":0.2785541413888936,"score_spread":0.2393898693822747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3194896812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23342367,0.00051596557,0.68041086,0.00093968655,0.0005256661,0.0021900062,0.0023895851,0.029365404,0.050239075],"genre_scores_gemma":[0.8472241,0.00023682641,0.11219913,0.00032707205,0.00006314422,0.0007418403,0.0010305032,0.00037091467,0.03780646],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997143,0.00003453312,0.000018095052,0.00006840748,0.00012780978,0.000036835518],"domain_scores_gemma":[0.99985516,0.000017299297,0.000013484005,0.000021873304,0.00007555569,0.000016564458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021075943,0.00042564957,0.00047533592,0.00037429022,0.0005994536,0.00068468077,0.0011185362,0.0004584407,0.01169614],"category_scores_gemma":[0.00021559536,0.0002891366,0.00036254516,0.00026949766,0.00015055347,0.0005304018,0.00034788565,0.00033145395,0.0036234355],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001031248,0.00085792394,0.019307561,0.0014231732,0.00016177064,0.003661727,0.00092163245,0.05929901,0.30577064,0.0065716924,0.054234594,0.54675895],"study_design_scores_gemma":[0.0005526975,0.0035722922,0.034137744,0.00018771815,0.0004478917,0.005958461,0.0006652096,0.3686505,0.35779446,0.0030833315,0.22470208,0.0002476781],"about_ca_topic_score_codex":0.0014810157,"about_ca_topic_score_gemma":0.0016546635,"teacher_disagreement_score":0.01169614,"about_ca_system_score_codex":0.0004937248,"about_ca_system_score_gemma":0.0006347664,"threshold_uncertainty_score":0.03912747},"labels":[],"label_agreement":null},{"id":"W3195278387","doi":"10.2139/ssrn.3718227","title":"Asymmetric Demand Response when Prices Increase and Decrease: The Case of Child Healthcare","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Health care; Economics; Business; Monetary economics; Economic growth","score_opus":0.0061262080966269575,"score_gpt":0.20582620577548155,"score_spread":0.1996999976788546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195278387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94986784,0.0005840181,0.00787958,0.013878171,0.00016665991,0.000061204206,0.0014588597,0.00010011861,0.026003513],"genre_scores_gemma":[0.99749494,0.000114105365,0.00045674975,0.00019130568,0.00003994298,0.0000072054518,0.000119315395,0.000013374426,0.0015630459],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99863476,0.0005281668,0.000033267777,0.00013155263,0.0000922424,0.0005800186],"domain_scores_gemma":[0.9905709,0.0067854645,0.0008101818,0.00033188806,0.00057640864,0.0009252262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025815954,0.00039230238,0.0013817949,0.0005823047,0.00096446945,0.0026648233,0.0015577251,0.004753311,0.012609291],"category_scores_gemma":[0.012011095,0.0005447714,0.00088278885,0.001060252,0.0015650272,0.002443554,0.0013482716,0.0031992109,0.0008441009],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007765734,0.0018100593,0.120662495,0.0008653789,0.0006149033,0.026670096,0.0041714367,0.47574067,0.007784497,0.25899974,0.06585881,0.029056111],"study_design_scores_gemma":[0.0008382641,0.0005366287,0.048370082,0.00006677073,0.00021160017,0.0027977536,0.01134663,0.8261844,0.0012059198,0.10019759,0.007978833,0.00026554207],"about_ca_topic_score_codex":0.039043695,"about_ca_topic_score_gemma":0.022378119,"teacher_disagreement_score":0.039043695,"about_ca_system_score_codex":0.0022937155,"about_ca_system_score_gemma":0.0010317754,"threshold_uncertainty_score":0.077632844},"labels":[],"label_agreement":null},{"id":"W3195393775","doi":"","title":"A Methodology to Forecast the Control Capacity and Control Payback of a Population of Thermostatically Controlled Appliances in a Demand-Side Management","year":2021,"lang":"en","type":"article","venue":"Research Portal (Queen's University Belfast)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Controllability; Payback period; Population; Demand response; Reliability (semiconductor); Control theory (sociology); Control (management); Grid; Estimation; Electric power system; Computer science; Renewable energy; Reliability engineering; Power (physics); Engineering; Electricity; Production (economics); Economics; Mathematics","score_opus":0.03371946690180831,"score_gpt":0.2730227702661493,"score_spread":0.23930330336434097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195393775","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013549267,0.00009534941,0.985103,0.00008000996,0.000028424907,0.000038695165,0.000070518974,0.00011137709,0.0009232948],"genre_scores_gemma":[0.8237344,0.00024968953,0.17336331,0.00005217341,0.00006589453,0.00023141825,0.0001787588,0.000029748953,0.002094573],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997507,0.000057486828,0.00001535306,0.00007073719,0.00007682991,0.000028845636],"domain_scores_gemma":[0.99909365,0.000483301,0.00017091716,0.00003972819,0.00017732938,0.000035031797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008786316,0.0005920742,0.0005627627,0.00049202755,0.00029835728,0.00071963726,0.00066666416,0.0007342555,0.0014136598],"category_scores_gemma":[0.0024987308,0.00030729096,0.00042448624,0.000442197,0.0003821935,0.0007482968,0.0003807351,0.0007546638,0.0001380416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001070466,0.000010711358,0.0003712429,0.000016351325,0.000009276356,0.000017066157,0.000013012105,0.98567975,0.00093591167,0.0029239752,0.00014006367,0.0098718945],"study_design_scores_gemma":[0.0000017391648,0.000009163317,0.0000865646,0.0000015092268,0.000001992569,0.0000046709383,0.0000020967611,0.9989405,0.00019997935,0.00062726,0.00012194486,0.000002567935],"about_ca_topic_score_codex":0.007980667,"about_ca_topic_score_gemma":0.0054627345,"teacher_disagreement_score":0.007980667,"about_ca_system_score_codex":0.0008279876,"about_ca_system_score_gemma":0.0011263668,"threshold_uncertainty_score":0.015868425},"labels":[],"label_agreement":null},{"id":"W3195895028","doi":"10.1109/tia.2021.3097293","title":"Planning Smart Grid Functions in Residential Loads Using a Virtual Equivalent Battery Storage Unit","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Fondation MAIF","keywords":"Smart grid; Transformer; Load management; Grid; Distribution transformer; Demand response; Energy storage; Automotive engineering; Energy management; Engineering; Reliability engineering; Computer science; Electrical engineering; Energy (signal processing); Power (physics); Voltage; Electricity","score_opus":0.03777236260565257,"score_gpt":0.26503480501509763,"score_spread":0.22726244240944507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195895028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032455314,0.00007717797,0.9622275,0.000054773536,0.00001614842,0.000052246836,0.000069700225,0.00072644197,0.004320678],"genre_scores_gemma":[0.83397037,0.0000821202,0.16392949,0.000019002246,0.00000814146,0.000092419905,0.000067472974,0.00005238339,0.001778495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998454,0.00004359261,0.000009145981,0.000030051617,0.00005588899,0.000015837057],"domain_scores_gemma":[0.99986076,0.000060454975,0.000018314142,0.000021966995,0.000028401826,0.000010118661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020634574,0.0004432343,0.00039812975,0.0002674795,0.00030477394,0.00046827184,0.00062453636,0.0002754503,0.002135145],"category_scores_gemma":[0.00047325416,0.00029946357,0.000302045,0.0002938274,0.00024970324,0.000674843,0.0003079905,0.00029258544,0.00023724226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007667913,0.000027721568,0.00060071197,0.000038271417,0.000015360694,0.00007297408,0.000054056753,0.92711276,0.0046588285,0.005064821,0.0005430448,0.0617348],"study_design_scores_gemma":[0.000005302302,0.000019573567,0.00008551935,0.0000024057065,0.000004799985,0.000018937439,0.000008355171,0.99665725,0.0015437587,0.0010837218,0.00056556,0.000004764489],"about_ca_topic_score_codex":0.004158854,"about_ca_topic_score_gemma":0.008646936,"teacher_disagreement_score":0.004158854,"about_ca_system_score_codex":0.00054363906,"about_ca_system_score_gemma":0.0006776578,"threshold_uncertainty_score":0.00826931},"labels":[],"label_agreement":null},{"id":"W3196945518","doi":"10.1109/tsg.2021.3110889","title":"Peer-to-Peer Energy Trading Enabled Optimal Decentralized Operation of Smart Distribution Grids","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Ministry of Education - Singapore; National Research Foundation Singapore","keywords":"Prosumer; Energy market; Smart grid; Distributed generation; Peer-to-peer; Scalability; Market clearing; Computer science; Market mechanism; Grid; Anonymity; Distributed computing; Microeconomics; Computer security; Economics; Renewable energy; Engineering","score_opus":0.011759027231500085,"score_gpt":0.2192699632883007,"score_spread":0.20751093605680063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196945518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089754045,0.00019237079,0.9013557,0.00021874643,0.0000426435,0.00010078869,0.000047151258,0.00034115204,0.007947387],"genre_scores_gemma":[0.9744771,0.000052579162,0.024373759,0.000017489812,0.000008076043,0.000042335465,0.000017679835,0.000015431438,0.0009955587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995634,0.00015808111,0.000015955124,0.000083765335,0.00012239852,0.000056405133],"domain_scores_gemma":[0.99967015,0.0001483745,0.000053172636,0.00003325257,0.00006964871,0.00002550059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000602811,0.00032610298,0.0006278363,0.00016547297,0.00047580057,0.00066991465,0.00076335046,0.0004768419,0.0013360495],"category_scores_gemma":[0.0009919131,0.00017364477,0.00023631351,0.00026576337,0.00049940415,0.00094521284,0.0008403983,0.0005390676,0.0001631108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001646577,0.0000825306,0.00050108327,0.00006880672,0.000021827009,0.00028808424,0.00010246024,0.90332174,0.009549712,0.036768943,0.00162106,0.047509015],"study_design_scores_gemma":[0.000008427256,0.000020344825,0.000053266172,9.923217e-7,0.0000020400244,0.0000205764,0.000011637402,0.9934355,0.00070519786,0.0053143026,0.00042452573,0.000003145239],"about_ca_topic_score_codex":0.0015213824,"about_ca_topic_score_gemma":0.00250801,"teacher_disagreement_score":0.0015213824,"about_ca_system_score_codex":0.0004839199,"about_ca_system_score_gemma":0.00078083685,"threshold_uncertainty_score":0.004469514},"labels":[],"label_agreement":null},{"id":"W3200592846","doi":"10.1007/978-3-030-57442-0","title":"Mathematical Optimization for Efficient and Robust Energy Networks","year":2021,"lang":"en","type":"book","venue":"AIRO Springer series/AIRO Springer Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Robust optimization; Mathematical optimization; Computer science; Set (abstract data type); Energy (signal processing); Work (physics); Optimization problem; Mathematics; Engineering; Mechanical engineering","score_opus":0.008297438189911386,"score_gpt":0.17382550683243178,"score_spread":0.1655280686425204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200592846","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030939055,0.014094659,0.8748846,0.0032568567,0.0013050411,0.00004150245,0.00019843264,0.00019433384,0.102930635],"genre_scores_gemma":[0.3297101,0.044557378,0.35736164,0.0015326516,0.0048915646,0.0006860299,0.0007827977,0.00084219465,0.25963572],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997384,0.000072811126,0.000012606727,0.000038367085,0.00011974432,0.00001802525],"domain_scores_gemma":[0.9996824,0.0001883464,0.000033836088,0.000035116955,0.00004678165,0.000013480185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061547826,0.0010848262,0.00093966053,0.0005235646,0.00024487238,0.0013634403,0.00075107795,0.0008479975,0.006133954],"category_scores_gemma":[0.0017182776,0.00043659692,0.00063725776,0.00097546756,0.0010075287,0.0014674636,0.00092627364,0.0022015844,0.0013834481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028715423,0.000031385276,0.00006980088,0.00023491727,0.000050295253,0.00002679238,0.000030337864,0.31530625,0.0011789575,0.5789104,0.034087505,0.0700446],"study_design_scores_gemma":[0.000009829395,0.000017881965,0.000121816964,0.00004301795,0.000011256406,0.000032051994,0.000011987537,0.55279577,0.0003683212,0.40875846,0.037817147,0.000012527824],"about_ca_topic_score_codex":0.0012821503,"about_ca_topic_score_gemma":0.0011302292,"teacher_disagreement_score":0.006133954,"about_ca_system_score_codex":0.0010670364,"about_ca_system_score_gemma":0.00054759876,"threshold_uncertainty_score":0.020520091},"labels":[],"label_agreement":null},{"id":"W3200780914","doi":"10.1109/sege52446.2021.9535058","title":"Design of a Smart Controller Agent for Demand-Side Management with Low Payback Effect","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; Computer science; Smart grid; Controller (irrigation); Renewable energy; Grid; Electric power system; Plug-in; Automatic Generation Control; Demand side; Simulation; Automotive engineering; Control engineering; Electricity; Power (physics); Engineering","score_opus":0.007312486505106639,"score_gpt":0.18937647032060986,"score_spread":0.18206398381550323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200780914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02888488,0.00017082255,0.9579245,0.00017855535,0.00014479697,0.00033203993,0.00005214913,0.0016813739,0.010630913],"genre_scores_gemma":[0.82471156,0.00012964042,0.16690727,0.0001407,0.000042113137,0.00054715585,0.000073282965,0.0000614671,0.0073868306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976116,0.000033842498,0.000018465944,0.00006288035,0.00008625105,0.000037329704],"domain_scores_gemma":[0.9998078,0.000030342697,0.000037878704,0.000020098876,0.0000734866,0.000030338557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027713037,0.0004393585,0.0005914222,0.00023082363,0.00039669374,0.000762591,0.0012770966,0.00071171345,0.0026070485],"category_scores_gemma":[0.0003479422,0.00030423424,0.00032211145,0.00011616798,0.00031814145,0.00047836313,0.0006297829,0.0005485247,0.0007310849],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005589598,0.0005162187,0.0022655,0.00043696124,0.00016351313,0.0008123018,0.00029006886,0.66732967,0.13694121,0.02982589,0.0056583593,0.15520136],"study_design_scores_gemma":[0.00004302579,0.00013057492,0.0001637706,0.000005695717,0.000015943138,0.00006221814,0.000010592725,0.98897773,0.0066691814,0.0006228941,0.0032876832,0.000010679765],"about_ca_topic_score_codex":0.0020236021,"about_ca_topic_score_gemma":0.0017085562,"teacher_disagreement_score":0.0026070485,"about_ca_system_score_codex":0.00037363655,"about_ca_system_score_gemma":0.0008737044,"threshold_uncertainty_score":0.008721471},"labels":[],"label_agreement":null},{"id":"W3200977970","doi":"10.1109/tsmc.2021.3111135","title":"Demand–Response Games for Peer-to-Peer Energy Trading With the Hyperledger Blockchain","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Systems Man and Cybernetics Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Norges Forskningsråd","keywords":"Smart contract; Demand response; Blockchain; Computer science; Provisioning; Renewable energy; Peer-to-peer; Efficient energy use; Environmental economics; Distributed computing; Computer security; Computer network; Electricity; Economics; Engineering","score_opus":0.010341657554395357,"score_gpt":0.19733191930477614,"score_spread":0.18699026175038078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200977970","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16721109,0.000248272,0.81708485,0.0007071707,0.00012040895,0.00041303068,0.00016346939,0.00052168913,0.013530085],"genre_scores_gemma":[0.9533444,0.00010424168,0.041097093,0.00008888857,0.000023827899,0.00025476585,0.00006966319,0.00003152755,0.0049855243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988575,0.00047213762,0.00006621817,0.00018966192,0.00026809337,0.00014634359],"domain_scores_gemma":[0.99759907,0.0014562709,0.00020850182,0.00022737216,0.0002520912,0.00025666616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001253212,0.0006095747,0.00087926816,0.000313959,0.0011390982,0.0015076653,0.0011674744,0.0011045961,0.005711001],"category_scores_gemma":[0.004032704,0.00030524415,0.00045344175,0.00038049291,0.0012938183,0.0023977298,0.0020005067,0.0013077466,0.00048001966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009260165,0.00047471377,0.0017101059,0.0002079217,0.000086619955,0.00083863596,0.0007918184,0.71932346,0.010890682,0.21288699,0.0023508577,0.04951215],"study_design_scores_gemma":[0.000052497846,0.000052883963,0.000081946964,0.0000057082334,0.0000063289986,0.000034742698,0.000034116038,0.9663194,0.0009474703,0.031343825,0.0011089412,0.000012195962],"about_ca_topic_score_codex":0.0030128416,"about_ca_topic_score_gemma":0.0033500525,"teacher_disagreement_score":0.005711001,"about_ca_system_score_codex":0.0011139802,"about_ca_system_score_gemma":0.0015079309,"threshold_uncertainty_score":0.019105136},"labels":[],"label_agreement":null},{"id":"W3201127604","doi":"10.1016/j.ijepes.2021.107553","title":"Two-stage framework for optimizing the operation of remote off-grid power systems under uncertainties","year":2021,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Computer science; Grid; Reliability engineering; Renewable energy; Process (computing); Electric power system; Stochastic optimization; Mathematical optimization; Stochastic programming; Power (physics); Engineering","score_opus":0.013215423294427662,"score_gpt":0.25682243139469985,"score_spread":0.2436070081002722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201127604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009772136,0.00021784304,0.9823369,0.00023792929,0.000049394235,0.00011813643,0.000090380825,0.0002628245,0.0069144964],"genre_scores_gemma":[0.8628024,0.0003166906,0.12730046,0.0001285493,0.00009914157,0.00038461713,0.00018442872,0.000145661,0.008638178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864906,0.00045510638,0.000052448133,0.00020360394,0.00037231256,0.00026747005],"domain_scores_gemma":[0.9989504,0.00053378573,0.00009800511,0.00007693067,0.00026898654,0.00007187186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025002963,0.0017791146,0.002358793,0.0007007816,0.0007359743,0.0028027163,0.0028588888,0.002784078,0.007313595],"category_scores_gemma":[0.0028908234,0.0012585572,0.0013427582,0.0006770252,0.0011743265,0.001905245,0.0023506752,0.0021715187,0.0006535187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050168488,0.000026718431,0.00012364508,0.00004113686,0.000025534006,0.000075879776,0.000034525376,0.9854313,0.00050255685,0.008161223,0.00028443238,0.005242877],"study_design_scores_gemma":[0.0000073371125,0.000018204404,0.000041691637,0.0000032945575,0.0000057692837,0.0000049797213,0.0000047281737,0.9978917,0.00013608778,0.0017300551,0.00015188091,0.0000043147593],"about_ca_topic_score_codex":0.010563933,"about_ca_topic_score_gemma":0.009657817,"teacher_disagreement_score":0.010563933,"about_ca_system_score_codex":0.0013246988,"about_ca_system_score_gemma":0.0027435787,"threshold_uncertainty_score":0.024466455},"labels":[],"label_agreement":null},{"id":"W3201239977","doi":"10.1016/j.egyr.2021.08.190","title":"Design and implementation of an open-Source IoT and blockchain-based peer-to-peer energy trading platform using ESP32-S2, Node-Red and, MQTT protocol","year":2021,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Memorial University of Newfoundland","funders":"Iran University of Science and Technology; Higher Education Commission, Pakistan","keywords":"MQTT; Computer science; Message queue; Computer network; Node (physics); Hypertext Transfer Protocol; The Internet; Embedded system; Operating system; Internet of Things; Engineering","score_opus":0.024175572657001095,"score_gpt":0.2786940365879395,"score_spread":0.2545184639309384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201239977","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.093834355,0.00048454842,0.85906875,0.0004719266,0.00022030211,0.0015605671,0.00044245654,0.015402258,0.02851487],"genre_scores_gemma":[0.80751544,0.00028796043,0.16749929,0.00023266056,0.0000640581,0.0008984817,0.00087621226,0.00026430105,0.022361679],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994313,0.00007291118,0.000046882076,0.0001118166,0.0002676188,0.00006949428],"domain_scores_gemma":[0.99966466,0.00003659326,0.000038776452,0.000068463996,0.00012918853,0.00006238356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004740095,0.00035951895,0.00046616615,0.00039155787,0.0004740481,0.0008407396,0.0016799889,0.0006897203,0.005463623],"category_scores_gemma":[0.0004423064,0.0002448166,0.00025413604,0.00032803402,0.00030926074,0.0009435468,0.0007477996,0.00046964796,0.0015977032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013086526,0.0011783199,0.008575596,0.0017677066,0.00020791878,0.0023085834,0.0008569215,0.094583,0.3272838,0.04056712,0.030709706,0.49065265],"study_design_scores_gemma":[0.00045039965,0.002057039,0.007500042,0.00011655508,0.00021017493,0.0018779202,0.00021041791,0.60806054,0.20369442,0.011344562,0.16426536,0.00021258174],"about_ca_topic_score_codex":0.0010462397,"about_ca_topic_score_gemma":0.0009883464,"teacher_disagreement_score":0.005463623,"about_ca_system_score_codex":0.00040947885,"about_ca_system_score_gemma":0.0009996835,"threshold_uncertainty_score":0.018277645},"labels":[],"label_agreement":null},{"id":"W3201912498","doi":"10.1016/j.energy.2021.122124","title":"Multi-objective optimization design and multi-attribute decision-making method of a distributed energy system based on nearly zero-energy community load forecasting","year":2021,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Key Research and Development Program of China; Ministry of Science and Technology of the People's Republic of China","keywords":"Zero-energy building; Computer science; Mathematical optimization; TOPSIS; Photovoltaic system; Energy (signal processing); Cluster analysis; Distributed generation; Monte Carlo method; Load profile; Solar energy; Entropy (arrow of time); Independence (probability theory); Renewable energy; Engineering; Operations research; Artificial intelligence; Mathematics; Electricity","score_opus":0.029529097739205222,"score_gpt":0.24588832862883803,"score_spread":0.2163592308896328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201912498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036816765,0.00012148187,0.9611971,0.00014839681,0.000054656102,0.00006242994,0.000032736247,0.00009391565,0.0014725131],"genre_scores_gemma":[0.8830003,0.00014303885,0.11484068,0.00005900877,0.00004897409,0.00026466913,0.00007526758,0.000035263947,0.0015327737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886024,0.0005014882,0.000055577384,0.0002209155,0.00024348656,0.00011829752],"domain_scores_gemma":[0.99870765,0.0007306188,0.00010394664,0.0000476381,0.00033147342,0.00007874205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027642103,0.00095705094,0.0015588773,0.0006987409,0.0009184605,0.00143908,0.0013464553,0.0012163196,0.0015822048],"category_scores_gemma":[0.002320677,0.00083975634,0.0013039445,0.0008254427,0.000646134,0.0012394175,0.00092291983,0.0012174648,0.00012822356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041968262,0.000042058247,0.00027821603,0.000032590167,0.00003288831,0.000025669391,0.000027503147,0.9879126,0.00061519176,0.0017316235,0.0001723086,0.009087407],"study_design_scores_gemma":[0.000002239751,0.000008458481,0.000033769196,7.6706056e-7,0.0000034778948,0.0000013594729,0.0000027183662,0.9996319,0.000066829096,0.00022594909,0.000020559375,0.000001983443],"about_ca_topic_score_codex":0.007964982,"about_ca_topic_score_gemma":0.0043002716,"teacher_disagreement_score":0.007964982,"about_ca_system_score_codex":0.001047407,"about_ca_system_score_gemma":0.0015114854,"threshold_uncertainty_score":0.015837193},"labels":[],"label_agreement":null},{"id":"W3202441821","doi":"10.1016/j.apenergy.2021.117836","title":"Demand response in buildings: Unlocking energy flexibility through district-level electro-thermal simulation","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"Horizon 2020; Horizon 2020 Framework Programme; European Commission","keywords":"Flexibility (engineering); Electricity; Demand response; Tariff; Peak demand; Load shifting; Environmental economics; Grid; Energy consumption; Consumption (sociology); Efficient energy use; Photovoltaics; Computer science; Engineering; Photovoltaic system; Business; Economics; Electrical engineering","score_opus":0.01826605726636976,"score_gpt":0.23344553206423216,"score_spread":0.2151794747978624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202441821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9455385,0.00008413121,0.039946824,0.00032561878,0.000050043425,0.000038314593,0.00046376738,0.00031214117,0.01324064],"genre_scores_gemma":[0.99818134,0.000011223681,0.0012062333,0.000011821808,0.0000022385407,0.0000072104513,0.0000617319,0.000013008901,0.00050509727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997993,0.000080143356,0.000007811989,0.00003026929,0.000028108263,0.000054305492],"domain_scores_gemma":[0.99915886,0.0005701745,0.000046054247,0.000069603004,0.00008680187,0.00006842125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046036515,0.0003400753,0.00059641886,0.0003078493,0.00040677216,0.00088997366,0.00074962963,0.00093628495,0.0029516672],"category_scores_gemma":[0.0015845146,0.00040005028,0.0004745312,0.0004873535,0.0004877699,0.0007358214,0.0006699836,0.00086804386,0.00021944269],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045579745,0.000034632973,0.00081748085,0.000007741971,0.0000059325116,0.000010803263,0.000011005605,0.99739033,0.00019567378,0.00043927625,0.00009133941,0.00095024216],"study_design_scores_gemma":[0.0000052196146,0.0000067640112,0.0001989862,6.400437e-7,0.0000015660816,9.226532e-7,0.000009963866,0.9994785,0.00011102016,0.00013799418,0.000046542245,0.0000018749066],"about_ca_topic_score_codex":0.03580062,"about_ca_topic_score_gemma":0.02947988,"teacher_disagreement_score":0.03580062,"about_ca_system_score_codex":0.00084963255,"about_ca_system_score_gemma":0.0007653765,"threshold_uncertainty_score":0.071184516},"labels":[],"label_agreement":null},{"id":"W3204456588","doi":"10.1109/globecom46510.2021.9685380","title":"Smart Home Energy Management: Sequence-to-Sequence Load Forecasting and Q-Learning","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Global Communications Conference (GLOBECOM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sequence (biology); Computer science; Energy management; Energy (signal processing); Artificial intelligence","score_opus":0.06126184037318961,"score_gpt":0.26291518502803163,"score_spread":0.20165334465484203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204456588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05446852,0.00027793355,0.9411995,0.00052558776,0.00009384387,0.00007376632,0.000046299512,0.00080347614,0.0025110513],"genre_scores_gemma":[0.9373492,0.00010568942,0.060670923,0.00023580194,0.000049572638,0.00006679895,0.00006418015,0.000028873965,0.0014289834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995591,0.00015677277,0.000022348311,0.0001265045,0.00008736552,0.000047829184],"domain_scores_gemma":[0.9988966,0.000666895,0.0001040528,0.00006279698,0.00021664266,0.00005300355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015049794,0.0005766703,0.0007930313,0.00022217113,0.0002888693,0.00052811456,0.0009701502,0.00074974325,0.0015703824],"category_scores_gemma":[0.0030051116,0.00031196143,0.0003301795,0.00031032015,0.0005954612,0.0011611212,0.0006094655,0.0010205908,0.0002547406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016419105,0.00022653569,0.0018808959,0.000044321332,0.000046797035,0.00006466131,0.000066836415,0.89408535,0.0023873579,0.0036331746,0.0013689506,0.09603093],"study_design_scores_gemma":[0.0000060688844,0.000023298251,0.000088150606,0.0000012746077,0.0000019674544,0.0000046501636,0.0000022648262,0.9986945,0.00032264975,0.0007569972,0.000096199874,0.0000020412006],"about_ca_topic_score_codex":0.008865872,"about_ca_topic_score_gemma":0.0065569244,"teacher_disagreement_score":0.008865872,"about_ca_system_score_codex":0.0006240062,"about_ca_system_score_gemma":0.0009906424,"threshold_uncertainty_score":0.01762849},"labels":[],"label_agreement":null},{"id":"W3204560711","doi":"10.1109/jiot.2021.3117924","title":"Blockchain-Based Trustworthy Energy Dispatching Approach for High Renewable Energy Penetrated Power Systems","year":2021,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Blockchain; Computer science; Renewable energy; Trustworthiness; Energy (signal processing); Power (physics); Energy exchange; Computer network; Computer security; Electrical engineering; Engineering","score_opus":0.008046554073743953,"score_gpt":0.1883541994840122,"score_spread":0.18030764541026822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204560711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038682472,0.00026965613,0.9528852,0.00045055876,0.00008081217,0.00015388636,0.000096029995,0.00033924668,0.0070421365],"genre_scores_gemma":[0.9450517,0.00023932787,0.049627386,0.0000807893,0.000043999218,0.00015905984,0.000122035904,0.00004264152,0.004632966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879706,0.0003597015,0.00007982963,0.00026295125,0.00032420515,0.00017623113],"domain_scores_gemma":[0.99841905,0.0007175705,0.00019753486,0.00022097761,0.0003031412,0.00014163162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012807357,0.00066356576,0.0010864871,0.00042279196,0.0012160635,0.0014577153,0.0014286683,0.0009831233,0.0052150227],"category_scores_gemma":[0.0029130923,0.0004040878,0.00055606477,0.0005764983,0.00084650243,0.0019066973,0.001949353,0.0012204058,0.0005418618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015915299,0.000061035036,0.00063027866,0.0000950694,0.00003247292,0.00038622099,0.00022116529,0.91866124,0.003041593,0.042125247,0.001282018,0.033304557],"study_design_scores_gemma":[0.000012441404,0.000017951828,0.000036951817,0.0000037119817,0.000004759102,0.00001536153,0.0000128444435,0.98929906,0.000295943,0.009771626,0.00052500644,0.000004386829],"about_ca_topic_score_codex":0.0060657123,"about_ca_topic_score_gemma":0.0062474487,"teacher_disagreement_score":0.0060657123,"about_ca_system_score_codex":0.0012897231,"about_ca_system_score_gemma":0.0020772112,"threshold_uncertainty_score":0.017445982},"labels":[],"label_agreement":null},{"id":"W3205928330","doi":"10.1002/2050-7038.13168","title":"Probabilistic integrated framework for <scp>AC</scp> / <scp>DC</scp> transmission congestion management considering system expansion, demand response, and renewable energy sources and load uncertainties","year":2021,"lang":"en","type":"article","venue":"International Transactions on Electrical Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Demand response; Renewable energy; Computer science; Scheduling (production processes); Electric power system; Mathematical optimization; Load management; Economic dispatch; Reliability engineering; Engineering; Power (physics); Electricity; Electrical engineering","score_opus":0.009665785317898652,"score_gpt":0.20792333101956725,"score_spread":0.1982575457016686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205928330","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020673194,0.00023240781,0.9937416,0.00013252052,0.000032396172,0.000043445692,0.000088839835,0.00011636054,0.003545001],"genre_scores_gemma":[0.5982196,0.0022874225,0.38426027,0.00020719951,0.00035723037,0.00082961103,0.0006989597,0.00029894462,0.012840875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988072,0.00041135284,0.00003983352,0.00018032736,0.00039037172,0.00017081846],"domain_scores_gemma":[0.9991786,0.00036923322,0.00010849258,0.00004793351,0.00022628665,0.00006945624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022191226,0.0015039666,0.0013083023,0.0012426511,0.00060579705,0.0022300899,0.0023084064,0.001336544,0.004481912],"category_scores_gemma":[0.0021357322,0.0007694689,0.0017241817,0.0016366972,0.00089685345,0.00175666,0.0015255576,0.0017912604,0.00051388936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000111378795,0.000022615432,0.00013755841,0.000030188998,0.000027441976,0.00004879662,0.00001917744,0.95000124,0.00021249295,0.042546973,0.00051350787,0.0064289058],"study_design_scores_gemma":[0.0000031744119,0.00001119254,0.000045196968,0.0000052254813,0.000009676586,0.0000083664045,0.0000066287744,0.992109,0.000047569498,0.007059307,0.0006906265,0.0000040211453],"about_ca_topic_score_codex":0.018411407,"about_ca_topic_score_gemma":0.017985402,"teacher_disagreement_score":0.018411407,"about_ca_system_score_codex":0.0019616773,"about_ca_system_score_gemma":0.0031404854,"threshold_uncertainty_score":0.036608458},"labels":[],"label_agreement":null},{"id":"W3206656095","doi":"10.5267/j.ijiec.2021.7.002","title":"Integrated modeling of the peer-to-peer markets in the energy industry","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Smart grid; Isolation (microbiology); Grid; Decomposition; Integer programming; Industrial engineering; Mathematical optimization; Scale (ratio); Linear programming; Operations research; Electricity; Distributed computing; Engineering; Mathematics; Algorithm","score_opus":0.0256908840809342,"score_gpt":0.24107197652037834,"score_spread":0.21538109243944414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206656095","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088765286,0.001453078,0.8295363,0.002076924,0.00024799907,0.00029458228,0.00041967444,0.0003777436,0.0768284],"genre_scores_gemma":[0.92678,0.0013169113,0.043038126,0.00016334884,0.00011463734,0.00033842164,0.000191641,0.000093645496,0.02796329],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990933,0.00032159043,0.000030762218,0.00017948056,0.00020872036,0.00016629057],"domain_scores_gemma":[0.9994111,0.0002412241,0.00009281765,0.000042840642,0.00013797948,0.0000740542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093880453,0.00077084906,0.0009610632,0.00060529093,0.0008475367,0.0029651104,0.0022598202,0.002581631,0.008332377],"category_scores_gemma":[0.0017828837,0.00050596055,0.0011733382,0.0009523446,0.0012853,0.003632718,0.001912551,0.0013688039,0.0011745717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037025864,0.000068726804,0.00043131196,0.000049995902,0.000030315432,0.00018397106,0.00009492189,0.88707095,0.00072028267,0.10516245,0.0009123179,0.0052376525],"study_design_scores_gemma":[0.00001435287,0.000024347088,0.00011522207,0.0000073151336,0.000009495927,0.000028176048,0.00004010521,0.97444767,0.00010209502,0.023071855,0.0021315445,0.000007797888],"about_ca_topic_score_codex":0.00830498,"about_ca_topic_score_gemma":0.00490768,"teacher_disagreement_score":0.008332377,"about_ca_system_score_codex":0.0014461295,"about_ca_system_score_gemma":0.0017265552,"threshold_uncertainty_score":0.027874589},"labels":[],"label_agreement":null},{"id":"W3207692912","doi":"10.1016/j.apenergy.2022.120500","title":"Multi-agent hierarchical reinforcement learning for energy management","year":2022,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Trottier Institute for Sustainability in Engineering and Design","keywords":"Reinforcement learning; Computer science; Scheduling (production processes); Novelty; Energy management; Control engineering; Efficient energy use; Distributed computing; Energy (signal processing); Artificial intelligence; Engineering","score_opus":0.010145179155417327,"score_gpt":0.1966193987083418,"score_spread":0.18647421955292448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207692912","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032331597,0.00032119767,0.96311736,0.00026007634,0.000068285524,0.000047759575,0.000033612996,0.00035115684,0.0034689435],"genre_scores_gemma":[0.9481039,0.000113268594,0.049178444,0.00006753007,0.000030456888,0.00007831757,0.000041258496,0.000024559042,0.0023622597],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961996,0.00016312003,0.000017261727,0.0000578439,0.00008130603,0.000060553262],"domain_scores_gemma":[0.9990827,0.00054104335,0.0001096539,0.000055710712,0.00014406447,0.00006676894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009730097,0.00049305294,0.00088559225,0.00031188736,0.0004099079,0.00058332155,0.0009830212,0.0007220997,0.001897897],"category_scores_gemma":[0.0025561166,0.00027957532,0.00033927025,0.00028355527,0.0006801692,0.00065101194,0.0009074187,0.0010313159,0.00025230768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003130806,0.00003158767,0.00021583824,0.000020908003,0.000017331902,0.000020301677,0.000017147062,0.98303163,0.00038624313,0.0045053354,0.00037619262,0.011346207],"study_design_scores_gemma":[0.0000036625593,0.000007141535,0.000023315963,9.5993e-7,0.0000013634292,0.0000015627842,0.0000012139479,0.99864477,0.000051767212,0.0012026617,0.000060743005,9.503358e-7],"about_ca_topic_score_codex":0.007863393,"about_ca_topic_score_gemma":0.0065236455,"teacher_disagreement_score":0.007863393,"about_ca_system_score_codex":0.00083802576,"about_ca_system_score_gemma":0.0009202259,"threshold_uncertainty_score":0.015635252},"labels":[],"label_agreement":null},{"id":"W3208682347","doi":"10.1007/s40095-021-00443-8","title":"Optimal scheduling of residential building energy system under B2G, G2B and B2B operation modes","year":2021,"lang":"en","type":"article","venue":"International journal of energy and environmental engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Renewable energy; Grid; Schedule; Tariff; Scheduling (production processes); Electricity; Profit (economics); Electric power system; Computer science; Engineering; Power (physics); Operations management; Business; Electrical engineering; Operating system","score_opus":0.003859337921211499,"score_gpt":0.17296526952817187,"score_spread":0.16910593160696039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208682347","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8275702,0.00062231696,0.14693908,0.00079074485,0.00018588212,0.0002612234,0.00068413035,0.00046912493,0.022477245],"genre_scores_gemma":[0.99472356,0.000037198573,0.004324309,0.000017309587,0.000008187362,0.000016938502,0.000057951907,0.000013549029,0.0008010611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995982,0.00013432871,0.000010703149,0.000057698788,0.00003909345,0.00016001586],"domain_scores_gemma":[0.9994375,0.00023173148,0.00006818028,0.000024992127,0.00009903347,0.00013855752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006250651,0.0006829629,0.0009275798,0.000461464,0.0005939405,0.0011626718,0.00067720714,0.0006522431,0.0037549213],"category_scores_gemma":[0.001007295,0.0003769389,0.00033323557,0.00047506887,0.00038639424,0.0005194695,0.00039268608,0.00054460764,0.00023011013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048510166,0.000077659286,0.00073998375,0.000050900533,0.000020615727,0.00007666856,0.000036654794,0.9843023,0.002346187,0.0021704414,0.0013897024,0.008303834],"study_design_scores_gemma":[0.000025324638,0.00006641959,0.0006474874,0.0000024693172,0.0000071618456,0.000008944994,0.000038442253,0.99776506,0.00033497135,0.000941389,0.00015800375,0.0000043044306],"about_ca_topic_score_codex":0.021657232,"about_ca_topic_score_gemma":0.020226534,"teacher_disagreement_score":0.021657232,"about_ca_system_score_codex":0.0011660996,"about_ca_system_score_gemma":0.0016627634,"threshold_uncertainty_score":0.04306233},"labels":[],"label_agreement":null},{"id":"W3208684372","doi":"10.1109/ccece53047.2021.9569169","title":"Design and Development of an Intelligent Tool for Retail Electric Provider Plan Selection","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Battery (electricity); Photovoltaic system; Plug-in; Computer science; Software; Energy consumption; Environmental economics; Engineering; Electrical engineering; Operating system","score_opus":0.029018529794287453,"score_gpt":0.21244389510753436,"score_spread":0.1834253653132469,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208684372","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007264269,0.000057020025,0.97468364,0.00009064192,0.000032425265,0.00036305794,0.00036971606,0.013762181,0.0033769412],"genre_scores_gemma":[0.12972766,0.00010712112,0.86338985,0.00013707405,0.000017032147,0.00075078267,0.0009701289,0.00051847857,0.004381814],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989145,0.00019591955,0.00012132619,0.0002693488,0.00040388567,0.00009499745],"domain_scores_gemma":[0.99799466,0.0011599434,0.00014986844,0.00016565148,0.00044906777,0.0000807863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015744834,0.0010313453,0.0008106727,0.0018441606,0.0004139618,0.0018939385,0.0019800947,0.0007975522,0.009474385],"category_scores_gemma":[0.004148497,0.0006226137,0.0007762049,0.00076985615,0.0003772439,0.001184417,0.00079499016,0.00070775766,0.0021375245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069500215,0.0005345864,0.006042322,0.0009268207,0.00020204106,0.001198005,0.00069585507,0.24909937,0.031944055,0.022565618,0.018636057,0.66746026],"study_design_scores_gemma":[0.00009442558,0.00012961745,0.0008109187,0.000088908986,0.00006519818,0.0002731224,0.00012306894,0.95266986,0.019283041,0.0039470703,0.022470536,0.00004414198],"about_ca_topic_score_codex":0.0030409344,"about_ca_topic_score_gemma":0.0026199403,"teacher_disagreement_score":0.009474385,"about_ca_system_score_codex":0.00070989836,"about_ca_system_score_gemma":0.0013995789,"threshold_uncertainty_score":0.03169501},"labels":[],"label_agreement":null},{"id":"W3208843793","doi":"10.1109/ccece53047.2021.9569086","title":"A New Approach to Design New Orthogonal Wavelets Using Unsupervised Clustering Applied to Nonintrusive Load Monitoring","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wavelet; Cluster analysis; Pattern recognition (psychology); Computer science; Artificial intelligence; Orthogonal wavelet; Discrete wavelet transform; Wavelet transform; Fast wavelet transform","score_opus":0.04454147722452254,"score_gpt":0.23497379215140748,"score_spread":0.19043231492688495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208843793","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00569965,0.000034623343,0.9938538,0.00002025798,0.000013413762,0.000018087167,0.000010615449,0.000071896226,0.0002776086],"genre_scores_gemma":[0.12042337,0.00015262424,0.8778947,0.00004190244,0.000041053234,0.00012768758,0.00012735,0.000085865715,0.0011054841],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993279,0.0001490514,0.000057344656,0.00016954224,0.00025088905,0.000045388973],"domain_scores_gemma":[0.9991731,0.00019836049,0.00011247027,0.0001485541,0.0003362196,0.000031265005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095556024,0.0005816865,0.0006261601,0.0007679434,0.0003636892,0.0005846931,0.00066081295,0.00054230535,0.000795769],"category_scores_gemma":[0.0020824652,0.00034880074,0.0008349681,0.00081924914,0.0003934818,0.00092578266,0.0005712898,0.0007766988,0.00044706927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015929707,0.00029142547,0.0023650879,0.0002301545,0.0001508075,0.00008558322,0.00028144606,0.17663316,0.10381622,0.026473349,0.0018479833,0.6876655],"study_design_scores_gemma":[0.000011237911,0.000103609935,0.0008178465,0.000009846083,0.000026886997,0.00005500877,0.000024572768,0.97978413,0.012641808,0.0036690426,0.002836328,0.000019648487],"about_ca_topic_score_codex":0.00094700034,"about_ca_topic_score_gemma":0.0012624586,"teacher_disagreement_score":0.00095556024,"about_ca_system_score_codex":0.00030507366,"about_ca_system_score_gemma":0.0006131431,"threshold_uncertainty_score":0.00505358},"labels":[],"label_agreement":null},{"id":"W3210905397","doi":"10.1016/j.epsr.2022.108375","title":"Batch reinforcement learning for network-safe demand response in unknown electric grids","year":2022,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada; Advanced Research Projects Agency - Energy; Institut de Valorisation des Données; National Science Foundation","keywords":"Demand response; Reinforcement learning; Reinforcement; Computer science; Artificial intelligence; Engineering; Electricity; Electrical engineering; Structural engineering","score_opus":0.021160563738685984,"score_gpt":0.27696394801232826,"score_spread":0.2558033842736423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210905397","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07302005,0.00027184314,0.92198485,0.0006650754,0.00011855262,0.00010719748,0.00016586468,0.001026121,0.002640489],"genre_scores_gemma":[0.971566,0.000062418214,0.025026688,0.00014791556,0.00004964251,0.00011055408,0.00013433602,0.0000775546,0.0028248655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993445,0.00023446494,0.000033846143,0.00014463272,0.000105488005,0.00013704892],"domain_scores_gemma":[0.9925701,0.0060330895,0.00034891645,0.0002314115,0.0005846746,0.00023183672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002588867,0.0010016923,0.0018823203,0.00041741505,0.000498462,0.00077709893,0.0018025065,0.0017122974,0.003995328],"category_scores_gemma":[0.009237703,0.0008313777,0.0004692269,0.00039137708,0.001645921,0.0013321317,0.0015273917,0.0024259132,0.00045119514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014335907,0.000034547917,0.000245176,0.000024180055,0.00001220244,0.00002629059,0.000018853603,0.9897462,0.00021971545,0.002223671,0.0005038655,0.006801925],"study_design_scores_gemma":[0.00000815114,0.000006874876,0.000019935826,0.0000010109165,0.0000011378168,0.0000011311132,0.0000012550827,0.99916327,0.00005153792,0.000727072,0.00001760893,0.0000011212024],"about_ca_topic_score_codex":0.018386751,"about_ca_topic_score_gemma":0.012287717,"teacher_disagreement_score":0.018386751,"about_ca_system_score_codex":0.0016127556,"about_ca_system_score_gemma":0.0017014091,"threshold_uncertainty_score":0.036559463},"labels":[],"label_agreement":null},{"id":"W3211458314","doi":"10.18280/mmep.080510","title":"Cloud-Based Automated Power Factor Correction and Power Monitoring","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cloud computing; Power factor; Computer science; Reliability engineering; Artificial neural network; Embedded system; Real-time computing; Electrical engineering; Engineering; Operating system; Artificial intelligence","score_opus":0.014551359783946564,"score_gpt":0.19710952607962437,"score_spread":0.1825581662956778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211458314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042687837,0.00069741905,0.9175257,0.00057352515,0.00026288087,0.0002758417,0.00074085407,0.011198535,0.02603746],"genre_scores_gemma":[0.89194584,0.00064485514,0.095772035,0.00021992193,0.00014537018,0.00011697053,0.00057653245,0.00026504838,0.010313399],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948275,0.000059125905,0.000024419018,0.00014080747,0.0002331872,0.000059712347],"domain_scores_gemma":[0.9992729,0.00013718776,0.00011873664,0.00018015028,0.00025737943,0.000033629374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031831834,0.0006830833,0.00058585475,0.0008005057,0.0005087839,0.00096911605,0.0010058613,0.00038613554,0.004764235],"category_scores_gemma":[0.0012072651,0.00021029415,0.0002940272,0.0012131382,0.00026989492,0.0014556707,0.000588767,0.0005003898,0.0015088071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084697356,0.00037152518,0.010542706,0.0003938381,0.0001042561,0.00057468686,0.00023237901,0.14297155,0.037233595,0.01908732,0.035448212,0.752193],"study_design_scores_gemma":[0.00005877055,0.000089600544,0.004231141,0.000046920584,0.000035587887,0.00029239047,0.00008707794,0.93177396,0.02684295,0.009622875,0.026885798,0.000032986067],"about_ca_topic_score_codex":0.0073955795,"about_ca_topic_score_gemma":0.006892255,"teacher_disagreement_score":0.0073955795,"about_ca_system_score_codex":0.000835105,"about_ca_system_score_gemma":0.0007437235,"threshold_uncertainty_score":0.015937924},"labels":[],"label_agreement":null},{"id":"W3211702474","doi":"10.22215/etd/2017-11794","title":"Exact and Approximate Solutions for Energy Cost Optimization in Smart Homes","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Smart grid; Computer science; Optimization problem; Convex optimization; Distributed generation; Linear programming; Scheduling (production processes); Energy storage; Renewable energy; Regular polygon; Mathematics; Engineering; Electrical engineering","score_opus":0.014252611948005742,"score_gpt":0.2308516639942552,"score_spread":0.21659905204624946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211702474","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008840015,0.00107773,0.9826241,0.00039596666,0.00007817979,0.000044424552,0.00009328119,0.00015329813,0.006692968],"genre_scores_gemma":[0.62836313,0.0022335914,0.35964105,0.0002581769,0.00017107543,0.0004013261,0.00035830695,0.00022333678,0.008350072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924767,0.00028313295,0.000027282054,0.00009859176,0.00024063968,0.000102711805],"domain_scores_gemma":[0.9983063,0.0012975698,0.00010263765,0.00008369207,0.00017181918,0.000038075657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013901249,0.0012251752,0.0014615977,0.00065572385,0.00046230666,0.001448338,0.0010046345,0.0013762481,0.00440679],"category_scores_gemma":[0.005207434,0.0006349636,0.00078413304,0.0012866118,0.0008035329,0.0021833356,0.0010594401,0.0016348268,0.00043458596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020412434,0.000025411098,0.00015299577,0.00007353163,0.0000121358835,0.000018482826,0.000019417366,0.96542114,0.00013732642,0.020499125,0.0009810646,0.012638924],"study_design_scores_gemma":[0.0000028664856,0.0000045138313,0.000021057262,0.00000454413,0.0000016167788,0.0000033603694,0.000008809304,0.992195,0.000038910825,0.0074237445,0.00029404968,0.0000016120953],"about_ca_topic_score_codex":0.008711352,"about_ca_topic_score_gemma":0.008226693,"teacher_disagreement_score":0.008711352,"about_ca_system_score_codex":0.001454655,"about_ca_system_score_gemma":0.0015404578,"threshold_uncertainty_score":0.017321289},"labels":[],"label_agreement":null},{"id":"W3212440815","doi":"10.32920/ryerson.14649462.v1","title":"Residential energy management systems with renewables and battery energy storage","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"Mitacs","keywords":"Renewable energy; Energy management; Computer science; Demand response; Variety (cybernetics); Environmental economics; Controller (irrigation); Model predictive control; Energy storage; Transactive memory; Energy consumption; Scale (ratio); Control (management); Risk analysis (engineering); Electricity; Energy (signal processing); Engineering; Business; Economics; Knowledge management","score_opus":0.005733752006449119,"score_gpt":0.16494873826689338,"score_spread":0.15921498626044425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212440815","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6304179,0.0007785693,0.30450204,0.0005738352,0.00010021172,0.00019405958,0.0003424088,0.001535192,0.061555848],"genre_scores_gemma":[0.9838928,0.00017558192,0.010074921,0.0000190573,0.000010235036,0.000040743562,0.00007083253,0.0000143902,0.0057014334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972564,0.000096313524,0.000014627066,0.00004999597,0.00008253389,0.00003075648],"domain_scores_gemma":[0.9998369,0.000049606224,0.000020951222,0.000037856767,0.00004659998,0.000008028609],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021130854,0.00028771823,0.00040581918,0.00016106869,0.00038412726,0.0008215435,0.0006788194,0.00038682195,0.0033398105],"category_scores_gemma":[0.00046478378,0.00022933805,0.0004964231,0.00045853556,0.00029599774,0.0009753569,0.0005815507,0.0003567383,0.0006261644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023803592,0.00022966429,0.0027535716,0.00013172785,0.0000701666,0.00019919963,0.00011091169,0.9241374,0.0063062413,0.0132980235,0.0010864424,0.05143865],"study_design_scores_gemma":[0.000031060605,0.00015532777,0.00089559023,0.000010463154,0.000025351435,0.00005699609,0.000054042175,0.9882826,0.0031332728,0.0037656368,0.0035787963,0.00001085051],"about_ca_topic_score_codex":0.0048259874,"about_ca_topic_score_gemma":0.0056920704,"teacher_disagreement_score":0.0048259874,"about_ca_system_score_codex":0.00054521195,"about_ca_system_score_gemma":0.00053180056,"threshold_uncertainty_score":0.011172712},"labels":[],"label_agreement":null},{"id":"W3212441087","doi":"10.3390/en14227481","title":"Cost-Optimized Microgrid Coalitions Using Bayesian Reinforcement Learning","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Microgrid; Reinforcement learning; Renewable energy; Scheduling (production processes); Computer science; Mathematical optimization; Engineering; Artificial intelligence; Control (management)","score_opus":0.022077355232414483,"score_gpt":0.2382437622502773,"score_spread":0.21616640701786283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212441087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07091598,0.00038485558,0.9171765,0.00042923304,0.000058902784,0.00009781016,0.00013023351,0.00033370827,0.0104728695],"genre_scores_gemma":[0.9688274,0.0001304926,0.027382582,0.000081210674,0.000017287055,0.000090620204,0.00008553394,0.00004322059,0.0033415998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994772,0.00018795607,0.000018201812,0.000100288074,0.000113588525,0.000102804785],"domain_scores_gemma":[0.99874026,0.0006900865,0.00019184049,0.00006225791,0.00018465823,0.0001309614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010958638,0.00089714624,0.001262568,0.0003918854,0.00044009456,0.00096201315,0.0013918251,0.0009675933,0.0032563782],"category_scores_gemma":[0.0029898637,0.0004863669,0.0005611345,0.00042142402,0.00078843307,0.0011111827,0.001317188,0.0013379914,0.00035389024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029304203,0.000021936934,0.00024296182,0.000013856314,0.00001654111,0.000030217989,0.000020964213,0.9887833,0.00021064989,0.005099048,0.000322135,0.0052090855],"study_design_scores_gemma":[0.0000050204735,0.000007771799,0.00002931237,0.0000018096091,0.0000026416533,0.0000033165397,0.0000039505526,0.9977701,0.00003914842,0.0020361834,0.00009917685,0.0000015887957],"about_ca_topic_score_codex":0.008589741,"about_ca_topic_score_gemma":0.00742002,"teacher_disagreement_score":0.008589741,"about_ca_system_score_codex":0.001387292,"about_ca_system_score_gemma":0.0013589206,"threshold_uncertainty_score":0.017079473},"labels":[],"label_agreement":null},{"id":"W3212933713","doi":"10.32920/ryerson.14663079.v1","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Chubu Electric Power Company; University of Waterloo; Tennessee Valley Authority","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Environmental economics; Electricity; Grid; Electric power system; Distributed generation; Engineering; Environmental science; Power (physics); Electrical engineering; Economics","score_opus":0.02209325686729482,"score_gpt":0.23459497470373933,"score_spread":0.2125017178364445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212933713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035917412,0.0008096278,0.9281214,0.00078505435,0.000093145696,0.0003690477,0.0017287732,0.00053468393,0.031640902],"genre_scores_gemma":[0.69568795,0.00092256087,0.291772,0.00011944917,0.000044876902,0.00078171,0.0019001118,0.0001401408,0.008631203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994679,0.00018519768,0.000022161,0.00009207528,0.00013143219,0.00010128842],"domain_scores_gemma":[0.9994479,0.00026972196,0.00005643353,0.000016699165,0.00016061032,0.000048559283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011716338,0.0012079473,0.0008502023,0.0009991808,0.0006177238,0.0018841585,0.0014755299,0.00096328807,0.006561687],"category_scores_gemma":[0.0014595337,0.0008808765,0.0015374046,0.0012049025,0.0005303538,0.00085241726,0.0012800992,0.0011207333,0.00038381192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000815468,0.000008858679,0.00021814495,0.000024523362,0.000013846889,0.00005290216,0.00002823801,0.9903769,0.000092449984,0.00589969,0.00031254705,0.0029638032],"study_design_scores_gemma":[0.000006267542,0.000010004239,0.00006145962,0.000008123164,0.000008130534,0.0000065022878,0.000033771517,0.99572253,0.00005484101,0.003131765,0.0009534466,0.0000031119898],"about_ca_topic_score_codex":0.06735502,"about_ca_topic_score_gemma":0.07511796,"teacher_disagreement_score":0.06735502,"about_ca_system_score_codex":0.0025372356,"about_ca_system_score_gemma":0.004357199,"threshold_uncertainty_score":0.13392597},"labels":[],"label_agreement":null},{"id":"W3213490051","doi":"10.1109/tai.2021.3125918","title":"Multiadvisor Reinforcement Learning for Multiagent Multiobjective Smart Home Energy Control","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Computer science; Curse of dimensionality; Scalability; Key (lock); Smart grid; Control (management); Demand response; Artificial intelligence; Machine learning; Engineering; Electricity","score_opus":0.024276005802833612,"score_gpt":0.24571070988491348,"score_spread":0.22143470408207985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213490051","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023761788,0.00013818193,0.97289103,0.0002182147,0.000042301963,0.0000659066,0.000016256063,0.0002968167,0.0025694363],"genre_scores_gemma":[0.91992867,0.000066495886,0.077159055,0.00012297084,0.00003097739,0.00013138153,0.000034047258,0.000029988314,0.0024965112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943143,0.00024119129,0.000024050896,0.00010420626,0.00013039839,0.00006869291],"domain_scores_gemma":[0.9986749,0.0007922187,0.00016025362,0.0000829674,0.00020641007,0.000083223924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001820131,0.000737404,0.00087525503,0.0002850232,0.00044317538,0.000595824,0.0013894679,0.000797164,0.0020231167],"category_scores_gemma":[0.0029098284,0.00031102594,0.00033138887,0.00024746658,0.00080093526,0.0006306358,0.00093016843,0.0014257942,0.0002858167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043592605,0.00005920373,0.0003289389,0.000024334566,0.000022582442,0.00002894642,0.000023480588,0.98014003,0.00056705263,0.0039531705,0.00033586138,0.0144727975],"study_design_scores_gemma":[0.0000059268705,0.000015772208,0.000019628174,0.0000012326223,0.0000014570954,0.0000031033308,0.0000017343299,0.99878997,0.0001032409,0.00096707244,0.00008963234,0.0000013157947],"about_ca_topic_score_codex":0.00393669,"about_ca_topic_score_gemma":0.004281515,"teacher_disagreement_score":0.00393669,"about_ca_system_score_codex":0.0008558338,"about_ca_system_score_gemma":0.0008420183,"threshold_uncertainty_score":0.009625912},"labels":[],"label_agreement":null},{"id":"W3213721292","doi":"10.4271/14-11-02-0012","title":"A Decentralized Multi-agent Energy Management Strategy Based on a Look-Ahead Reinforcement Learning Approach","year":2021,"lang":"en","type":"article","venue":"SAE International Journal of Electrified Vehicles","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; Université du Québec à Trois-Rivières","funders":"","keywords":"Reinforcement learning; Reinforcement; Computer science; Process management; Artificial intelligence; Business; Engineering","score_opus":0.016935515687224508,"score_gpt":0.23861624496839523,"score_spread":0.22168072928117072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213721292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028068934,0.00017788615,0.9644296,0.00022179792,0.000049691465,0.000082595536,0.000018970377,0.00029214544,0.0066582896],"genre_scores_gemma":[0.95549697,0.00008038144,0.04095011,0.000082231614,0.000025566944,0.000115730276,0.000023118546,0.000013404395,0.003212533],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997367,0.00007159719,0.000011985853,0.000065541935,0.00006795974,0.00004620934],"domain_scores_gemma":[0.9996921,0.000101062746,0.000058927904,0.00002266206,0.0000867338,0.000038542843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045146787,0.00055354764,0.00069221837,0.00023578956,0.00036870298,0.0006216517,0.0010680299,0.0007400277,0.0015736223],"category_scores_gemma":[0.00069816917,0.00022583519,0.00034493918,0.00016947585,0.0005354576,0.00041542583,0.00065742934,0.0006311183,0.00025048965],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007123064,0.000079018864,0.00044632016,0.000046323174,0.000043830973,0.00013494067,0.00005865277,0.9544686,0.0039573973,0.008294899,0.00065650785,0.03174229],"study_design_scores_gemma":[0.000012988767,0.000037870275,0.000051852203,0.000002308987,0.000005161723,0.000012263167,0.000004253553,0.9984068,0.00026658957,0.00093001267,0.00026599303,0.0000038508247],"about_ca_topic_score_codex":0.0033751766,"about_ca_topic_score_gemma":0.0030567774,"teacher_disagreement_score":0.0033751766,"about_ca_system_score_codex":0.0005446642,"about_ca_system_score_gemma":0.0008174867,"threshold_uncertainty_score":0.006711066},"labels":[],"label_agreement":null},{"id":"W3214275449","doi":"10.3390/su132212693","title":"A Novel Machine Learning-Based Price Forecasting for Energy Management Systems","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"Taif University","keywords":"Mean absolute percentage error; Electricity price forecasting; Computer science; Energy management system; Support vector machine; Time series; Electric power system; Tariff; Electricity; Firefly algorithm; Energy management; Data mining; Mathematical optimization; Machine learning; Energy (signal processing); Electricity market; Power (physics); Artificial neural network; Particle swarm optimization; Engineering; Economics; Statistics; Mathematics","score_opus":0.011679199068315858,"score_gpt":0.2063641730594343,"score_spread":0.19468497399111845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3214275449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016948739,0.000479625,0.9768002,0.00020655185,0.0002010117,0.000048220452,0.00011449797,0.0012121055,0.0039891237],"genre_scores_gemma":[0.7162365,0.0006620305,0.2768489,0.00017270408,0.00023386837,0.0001361,0.00040563353,0.00006162907,0.005242751],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975926,0.00003113729,0.000017243747,0.00005867569,0.00011347331,0.000020133026],"domain_scores_gemma":[0.99983394,0.000051368956,0.000022345504,0.000017025473,0.0000684729,0.0000069243283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030872133,0.0005162551,0.0005756823,0.00040916007,0.0003019687,0.0005302297,0.0006247352,0.0005165144,0.0013192991],"category_scores_gemma":[0.0008462246,0.00019283182,0.00040141254,0.0006493206,0.00014919271,0.000786294,0.00025364512,0.00065599073,0.0004571965],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013679467,0.00015267944,0.0017592387,0.00014898666,0.00009649052,0.00017163149,0.000044906206,0.44035858,0.016635023,0.00770529,0.0048710126,0.5279194],"study_design_scores_gemma":[0.0000035970984,0.000021030983,0.00023153583,0.0000026504379,0.00000500765,0.000019021483,0.0000016553463,0.99738115,0.0010246326,0.0004465535,0.00085977523,0.0000033489594],"about_ca_topic_score_codex":0.0043563657,"about_ca_topic_score_gemma":0.004243366,"teacher_disagreement_score":0.0043563657,"about_ca_system_score_codex":0.00034130056,"about_ca_system_score_gemma":0.0004977821,"threshold_uncertainty_score":0.008661985},"labels":[],"label_agreement":null},{"id":"W3215464418","doi":"10.1109/5gwf52925.2021.00042","title":"Deep Reinforcement Learning Based Coalition Formation for Energy Trading in Smart Grid","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Reinforcement learning; Computer science; Smart grid; Renewable energy; Reliability (semiconductor); Grid; Game theory; Dynamic pricing; Distributed computing; Scheme (mathematics); Minification; Mathematical optimization; Artificial intelligence; Control (management); Microeconomics; Engineering; Economics","score_opus":0.011711312304694632,"score_gpt":0.19638056921476724,"score_spread":0.1846692569100726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215464418","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13562828,0.0003813407,0.85759425,0.00047805122,0.00007418646,0.000060915612,0.00003826805,0.00044888846,0.005295831],"genre_scores_gemma":[0.97703314,0.000057332385,0.021527426,0.00006676264,0.0000094307,0.000026826236,0.000020469999,0.000015236724,0.0012433706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997166,0.00009666886,0.000010802973,0.00004918508,0.000060110888,0.000066615285],"domain_scores_gemma":[0.99926597,0.00040343005,0.00008972074,0.00004874874,0.00011417786,0.00007805525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093403703,0.00049412495,0.00086372386,0.00021582449,0.00038632663,0.0005161367,0.0009385344,0.00062477717,0.00155603],"category_scores_gemma":[0.001933525,0.00023199698,0.0003054485,0.0002618346,0.00070474605,0.0011213671,0.0010840503,0.0010960657,0.00015248831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008825159,0.00010554055,0.00065543124,0.000024728271,0.000030616924,0.00005426657,0.00004192684,0.9600739,0.0014047403,0.008278406,0.00056336494,0.028678792],"study_design_scores_gemma":[0.0000039706892,0.000009573839,0.000028439506,7.702187e-7,0.0000014788869,0.0000026297666,0.0000033374238,0.9980186,0.00014205712,0.0017139168,0.00007426027,0.0000010710074],"about_ca_topic_score_codex":0.005019597,"about_ca_topic_score_gemma":0.005573196,"teacher_disagreement_score":0.005019597,"about_ca_system_score_codex":0.00086903275,"about_ca_system_score_gemma":0.00108382,"threshold_uncertainty_score":0.009980798},"labels":[],"label_agreement":null},{"id":"W3216471581","doi":"10.1016/j.enbuild.2021.111731","title":"A critical review of control schemes for demand-side energy management of building clusters","year":2021,"lang":"en","type":"review","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Peak demand; Energy consumption; HVAC; Demand response; Smart grid; Energy management; Load shifting; Environmental economics; Energy storage; Energy engineering; Zero-energy building; Energy management system; Control (management); Efficient energy use; Consumption (sociology); Building automation; Grid; Energy accounting; Microgrid; Engineering; Electricity; Energy (signal processing); Computer science; Air conditioning; Electrical engineering; Mechanical engineering","score_opus":0.017450274200787142,"score_gpt":0.27864349755950385,"score_spread":0.2611932233587167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216471581","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015605341,0.9960492,0.0015260981,0.00032259064,0.00037363148,0.000011594621,0.000034652767,0.00001318282,0.0015129364],"genre_scores_gemma":[0.00201698,0.994843,0.0014868272,0.0003941237,0.00036904565,0.000013819079,0.000069379465,0.000005460308,0.0008012895],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99967194,0.00005643703,0.00005285941,0.0000699993,0.00011753786,0.000031178726],"domain_scores_gemma":[0.99905723,0.00056171406,0.00008605579,0.000037086615,0.000228928,0.000028940933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008432821,0.0010721076,0.0013447009,0.0015146652,0.00025730336,0.0011306383,0.0013843963,0.0011875067,0.004103527],"category_scores_gemma":[0.0016789554,0.00046706107,0.00061704917,0.002271414,0.00042460786,0.0016817622,0.0006453066,0.0014832182,0.0014637343],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007550487,0.000092860624,0.000101007965,0.023921529,0.00009563826,0.0000718286,0.000032485266,0.0018709291,0.0016372977,0.010057235,0.023025073,0.9390186],"study_design_scores_gemma":[0.00002445834,0.00026988503,0.0007388967,0.008827199,0.00027101085,0.00038907686,0.000052397096,0.001139908,0.0012698299,0.0045855325,0.9823887,0.000043234882],"about_ca_topic_score_codex":0.0017410393,"about_ca_topic_score_gemma":0.0022203666,"teacher_disagreement_score":0.004103527,"about_ca_system_score_codex":0.00066504633,"about_ca_system_score_gemma":0.0012934536,"threshold_uncertainty_score":0.013727725},"labels":[],"label_agreement":null},{"id":"W3216854841","doi":"10.1109/epec52095.2021.9621744","title":"Market-Clearing Mechanism for Demand Aggregation at the distribution level through Transactive Energy","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Science and Engineering Research Council; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Transactive memory; Mechanism (biology); Clearing; Market mechanism; Market clearing; Distribution (mathematics); Business; Environmental economics; Computer science; Industrial organization; Microeconomics; Knowledge management; Economics; Market economy; Physics","score_opus":0.018186476941460885,"score_gpt":0.20464357294714716,"score_spread":0.18645709600568627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216854841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04111852,0.0001331791,0.94321215,0.00039458738,0.00007563902,0.0001591164,0.000114295304,0.00031054643,0.014481935],"genre_scores_gemma":[0.9539679,0.00012543568,0.039650578,0.0000933179,0.00003102951,0.00013074756,0.00005278348,0.00003874146,0.005909392],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989305,0.00043654186,0.000048532853,0.00022911582,0.0001801224,0.0001750237],"domain_scores_gemma":[0.99898213,0.00041684727,0.00015114098,0.00015231536,0.00017832503,0.00011925547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015885239,0.00056000496,0.0008353481,0.00039132166,0.0007972669,0.0022031635,0.0019061074,0.0010713664,0.0081529785],"category_scores_gemma":[0.0025746515,0.00032582702,0.00091934344,0.0005912027,0.0010849006,0.0029909755,0.0015983194,0.0011943415,0.00069082284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028393205,0.0003238462,0.00085071893,0.00016623862,0.00011061003,0.00067463936,0.0004458762,0.45922795,0.012572259,0.48224908,0.005686825,0.03740795],"study_design_scores_gemma":[0.000039651615,0.00007157077,0.00011293302,0.000009066487,0.000018191146,0.00009799242,0.00006319605,0.9457026,0.0012192691,0.04991038,0.0027389806,0.000016166474],"about_ca_topic_score_codex":0.0020869074,"about_ca_topic_score_gemma":0.0027626401,"teacher_disagreement_score":0.0081529785,"about_ca_system_score_codex":0.0014450648,"about_ca_system_score_gemma":0.001385193,"threshold_uncertainty_score":0.02727449},"labels":[],"label_agreement":null},{"id":"W3217020979","doi":"10.1109/ecce47101.2021.9595608","title":"A Model-Based Short-term Load Forecast Methodology for Aggregated Power Consumption of Thermostatically Controlled Appliances in DSM","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Siemens Canada; Emera","keywords":"Reliability (semiconductor); Computer science; Term (time); Electric power system; Renewable energy; Reliability engineering; Air conditioning; Grid; Operator (biology); Power (physics); Wind power; Simulation; Control theory (sociology); Automotive engineering; Real-time computing; Control (management); Engineering; Electrical engineering","score_opus":0.07481255443132385,"score_gpt":0.30038315506747876,"score_spread":0.22557060063615492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217020979","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049394518,0.00019203266,0.9472427,0.00007924303,0.000054854405,0.000040477124,0.00017192075,0.0009188702,0.0019054528],"genre_scores_gemma":[0.92217153,0.00013759038,0.07622298,0.000026219219,0.000026051302,0.000067989844,0.0002753329,0.000053802196,0.0010184816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999114,0.000018483555,0.0000060065486,0.000016802238,0.000035335357,0.000012031746],"domain_scores_gemma":[0.99984,0.000047849106,0.000022959346,0.000015705009,0.00006363447,0.000009719151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027370785,0.00044061826,0.0004893785,0.00036339293,0.00024230561,0.0004366119,0.00053156214,0.00030607788,0.0010287164],"category_scores_gemma":[0.00058139634,0.00024400333,0.0003756892,0.00039891258,0.00012185173,0.00045692598,0.00023489808,0.00046569735,0.00025958457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000404909,0.00003132647,0.00059603003,0.000043635213,0.000019271045,0.00004190007,0.000025727668,0.9493253,0.003243628,0.0012749536,0.0006129254,0.04474478],"study_design_scores_gemma":[0.0000010925119,0.0000049091004,0.00007541357,8.9717213e-7,0.0000011739378,0.000002605757,0.0000021824176,0.99953365,0.00015760375,0.0001591645,0.000059828708,0.0000014287034],"about_ca_topic_score_codex":0.013370526,"about_ca_topic_score_gemma":0.013202145,"teacher_disagreement_score":0.013370526,"about_ca_system_score_codex":0.00039429587,"about_ca_system_score_gemma":0.0007039064,"threshold_uncertainty_score":0.0265854},"labels":[],"label_agreement":null},{"id":"W3217471358","doi":"10.18280/ejee.230502","title":"Impact of the Integration of a STATCOM Controlled by LQG/H2 Regulator in an Energy System","year":2021,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Linear-quadratic-Gaussian control; Control theory (sociology); Multivariable calculus; Linear-quadratic regulator; Controller (irrigation); MATLAB; AC power; Control engineering; Computer science; Gaussian; Voltage; Engineering; Control (management); Chemistry","score_opus":0.005144749324976477,"score_gpt":0.1891856677706632,"score_spread":0.18404091844568674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217471358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89923316,0.0012619443,0.07394771,0.0006596674,0.00042810908,0.00010644979,0.00016370245,0.0016533417,0.02254595],"genre_scores_gemma":[0.9984097,0.00006419266,0.00086106046,0.000045513163,0.000026982092,0.000006996724,0.000023733557,0.00001516338,0.000546641],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987275,0.0005663074,0.00005625878,0.00018942647,0.00029653774,0.00016389461],"domain_scores_gemma":[0.99851555,0.0006371815,0.00012164424,0.0001186264,0.0005027584,0.00010423773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011605219,0.0008634264,0.00077598344,0.00041428788,0.0005220534,0.0020108942,0.00069499697,0.0014549972,0.0041981614],"category_scores_gemma":[0.0018311318,0.00026109346,0.00053753686,0.00036550168,0.00057401287,0.0010533064,0.00082239386,0.001011353,0.00052133086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0075643347,0.0017855294,0.016475413,0.0011820745,0.0010421067,0.0033470618,0.00038352964,0.74856263,0.11354738,0.0047167367,0.003355901,0.09803734],"study_design_scores_gemma":[0.00055721565,0.006232716,0.018133033,0.00011212134,0.000841869,0.00041381313,0.00045782665,0.92656624,0.040163267,0.0013381953,0.005101871,0.00008181745],"about_ca_topic_score_codex":0.004514348,"about_ca_topic_score_gemma":0.0030627863,"teacher_disagreement_score":0.004514348,"about_ca_system_score_codex":0.0005963811,"about_ca_system_score_gemma":0.00053535914,"threshold_uncertainty_score":0.014044285},"labels":[],"label_agreement":null},{"id":"W3217719870","doi":"10.1109/ecce47101.2021.9595165","title":"Smart Microgrid Architecture For Home Energy Management System","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Microgrid; Energy management system; Smart grid; Energy management; Computer science; Architecture; Embedded system; Software architecture; Home automation; Field (mathematics); Energy consumption; Systems engineering; Software; Engineering; Energy (signal processing); Control (management); Operating system; Electrical engineering; Artificial intelligence","score_opus":0.004369336319565318,"score_gpt":0.16525211952458638,"score_spread":0.16088278320502106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217719870","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12722123,0.001963427,0.7335347,0.0012385002,0.00048821943,0.00041634517,0.00077189173,0.015362796,0.11900298],"genre_scores_gemma":[0.88163817,0.00091469527,0.08356691,0.0002455662,0.0001235417,0.00025547147,0.0007457926,0.00014261444,0.03236738],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998853,0.000022706137,0.000010127183,0.000035487818,0.00002956244,0.000016780821],"domain_scores_gemma":[0.9999589,0.00000262184,0.000003720903,0.000008584721,0.0000200131,0.0000061917685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009841328,0.00029582734,0.00023903893,0.00023083661,0.00039905804,0.0007338092,0.00078404706,0.00033264232,0.0068638916],"category_scores_gemma":[0.00008444667,0.00011980312,0.00018873357,0.00025953114,0.00017504986,0.00060588657,0.00055540266,0.00023750821,0.002018497],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000619451,0.00031579332,0.0064520705,0.0011657553,0.00020576577,0.0018766633,0.0010592398,0.25577828,0.11962349,0.11875627,0.060683522,0.43346375],"study_design_scores_gemma":[0.00007511002,0.00043174945,0.0038615535,0.00011388704,0.00012130348,0.0011065378,0.0004186349,0.73619217,0.038286977,0.02443478,0.19488281,0.00007455004],"about_ca_topic_score_codex":0.0020177586,"about_ca_topic_score_gemma":0.0022061865,"teacher_disagreement_score":0.0068638916,"about_ca_system_score_codex":0.0003742945,"about_ca_system_score_gemma":0.00041154315,"threshold_uncertainty_score":0.022962034},"labels":[],"label_agreement":null},{"id":"W4200233353","doi":"10.3390/en15010107","title":"Smart Cities and Urban Management—A Section of Energies (ISSN 1996-1073)","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Section (typography); Smart city; Energy management; Urban management; Efficient energy use; Regional science; Environmental planning; Energy (signal processing); Urban planning; Architectural engineering; Transport engineering; Geography; Business; Computer science; Civil engineering; Engineering; Computer security; Internet of Things; Advertising; Physics","score_opus":0.004992383615320679,"score_gpt":0.16818948160234068,"score_spread":0.16319709798702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200233353","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013541669,0.26706836,0.003938964,0.061494693,0.07692832,0.00009695466,0.0007018609,0.00025364963,0.5881631],"genre_scores_gemma":[0.009385416,0.24894798,0.0014330096,0.005515505,0.022691475,0.000073894495,0.00058560586,0.00021669187,0.7111504],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993338,0.00007032765,0.00006517986,0.000107484855,0.0003654577,0.0000576629],"domain_scores_gemma":[0.9983839,0.00058954937,0.00015376975,0.00010064809,0.00058032706,0.00019184356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009358141,0.0012263486,0.00073750905,0.0020579041,0.00084501266,0.00521115,0.0004949114,0.0022797664,0.11240547],"category_scores_gemma":[0.001757336,0.0004271525,0.0003322069,0.004960569,0.0011148114,0.0040059476,0.0011573354,0.0028933494,0.04375869],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034065906,0.00007151802,0.00041157744,0.00051766424,0.000013506164,0.00006485624,0.00011959598,0.00044762218,0.0004983401,0.028829958,0.73368233,0.23530902],"study_design_scores_gemma":[0.00000285349,0.000022942797,0.000997375,0.00027831495,0.000004508055,0.00007022464,0.000071686845,0.0000938889,0.00010580209,0.0034827183,0.99486345,0.000006243553],"about_ca_topic_score_codex":0.0033492644,"about_ca_topic_score_gemma":0.008160265,"teacher_disagreement_score":0.11240547,"about_ca_system_score_codex":0.0017934734,"about_ca_system_score_gemma":0.0017759968,"threshold_uncertainty_score":0.37603378},"labels":[],"label_agreement":null},{"id":"W4200292712","doi":"10.3390/en14248501","title":"Optimal Energy Management of a Campus Microgrid Considering Financial and Economic Analysis with Demand Response Strategies","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Microgrid; Demand response; Environmental economics; Energy management; Finance; Business; Demand management; Financial management; Energy (signal processing); Economics; Engineering; Macroeconomics; Electricity; Control (management); Electrical engineering; Management; Physics","score_opus":0.0037648444852269925,"score_gpt":0.18155883171790094,"score_spread":0.17779398723267395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200292712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5120059,0.0007810504,0.43385077,0.001431156,0.000097182485,0.00021427197,0.00049438764,0.0002964591,0.050828792],"genre_scores_gemma":[0.9896814,0.0001538984,0.006853325,0.000024479747,0.000009405993,0.000049013426,0.00005049266,0.00001566889,0.0031622688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997485,0.00009935863,0.000009093124,0.000044380315,0.000037743295,0.000060874547],"domain_scores_gemma":[0.9997508,0.00010116231,0.00004242854,0.000009748991,0.0000652256,0.000030726354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053120754,0.0007835717,0.0006895028,0.00045392892,0.00049133087,0.0017705989,0.0006365515,0.0010870182,0.003128002],"category_scores_gemma":[0.0010848121,0.0004140504,0.0006155467,0.00049000495,0.00048277725,0.0009098913,0.00089117425,0.0007293838,0.00018973803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027994542,0.000017547196,0.0004423215,0.000022316937,0.0000136247,0.0001021648,0.000018338147,0.99264246,0.00041021188,0.0037173852,0.00024564523,0.0023401072],"study_design_scores_gemma":[0.0000038027924,0.000017194794,0.00015312873,0.000002614543,0.00000706791,0.000008937836,0.000038957045,0.99837303,0.00011023969,0.0010872618,0.00019419004,0.0000036060571],"about_ca_topic_score_codex":0.012581193,"about_ca_topic_score_gemma":0.009216879,"teacher_disagreement_score":0.012581193,"about_ca_system_score_codex":0.0013618928,"about_ca_system_score_gemma":0.0012408934,"threshold_uncertainty_score":0.02501595},"labels":[],"label_agreement":null},{"id":"W4200626580","doi":"10.1088/1742-6596/2069/1/012107","title":"Quantile regression using gradient boosted decision trees for daily residential energy load disaggregation","year":2021,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Quantile regression; Smart meter; Decision tree; Quantile; Linear regression; Computer science; Statistics; Metering mode; Electricity; Data mining; Machine learning; Engineering; Mathematics","score_opus":0.02599955855126318,"score_gpt":0.25449042146398554,"score_spread":0.22849086291272236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200626580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3042757,0.0017523174,0.6868804,0.00078451785,0.00013073589,0.00013366707,0.0011669678,0.0025845561,0.002291107],"genre_scores_gemma":[0.95778173,0.00015499993,0.04006275,0.00010767436,0.000036066114,0.00005931391,0.0008652662,0.000051500094,0.00088065024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991628,0.00043643126,0.000041556625,0.00016009997,0.00010172906,0.000097445634],"domain_scores_gemma":[0.9970011,0.002236888,0.00018161765,0.000113626986,0.00037314885,0.000093518276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027599484,0.0009788442,0.0013466997,0.00078325067,0.00030639174,0.00085572776,0.0010184563,0.0007561651,0.0017686371],"category_scores_gemma":[0.0049236086,0.00038488826,0.0008808467,0.0008630361,0.00028725693,0.0005988646,0.00054655405,0.0013762363,0.0004429733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000108499,0.00007683751,0.002574407,0.0000300231,0.00003503274,0.000039314473,0.000019176945,0.9683355,0.00026633908,0.0005492919,0.00062318123,0.027342403],"study_design_scores_gemma":[0.0000023976093,0.000007558646,0.0001603975,0.0000017631396,0.000001911298,0.0000015087924,0.000002389191,0.99930465,0.00005435705,0.00042478114,0.00003712606,0.0000011367131],"about_ca_topic_score_codex":0.01959345,"about_ca_topic_score_gemma":0.011384554,"teacher_disagreement_score":0.01959345,"about_ca_system_score_codex":0.0009164901,"about_ca_system_score_gemma":0.0008290862,"threshold_uncertainty_score":0.038958788},"labels":[],"label_agreement":null},{"id":"W4205302458","doi":"10.1109/access.2021.3139985","title":"Auction-Based Scheduling of Excess Energy Consumption to Enhance Grid Upward Flexibility","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Cloud computing; Energy consumption; Distributed computing; Renewable energy; Grid; Flexibility (engineering); Load balancing (electrical power); Scheduling (production processes); Workload; Efficient energy use; Operating system; Operations management; Engineering; Electrical engineering","score_opus":0.030273850146297233,"score_gpt":0.3096852245897729,"score_spread":0.27941137444347564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205302458","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11834359,0.00027182922,0.86555684,0.00026724586,0.00017082167,0.00030800377,0.00012294417,0.0017719019,0.0131868655],"genre_scores_gemma":[0.9644162,0.000048071917,0.03366093,0.000045946985,0.000027982987,0.000051899035,0.000044708926,0.00007299078,0.0016312738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893135,0.0002933251,0.00009230289,0.00019119348,0.0002628948,0.0002288806],"domain_scores_gemma":[0.99852693,0.0004836129,0.00019427147,0.00027235446,0.0003107278,0.0002121333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015992702,0.0005855341,0.0008155276,0.00037225263,0.000496978,0.0014734637,0.0012441048,0.0004336931,0.004309819],"category_scores_gemma":[0.002628877,0.0002956455,0.00044968777,0.00054008106,0.00047037943,0.0011795228,0.0010582055,0.00084943423,0.00056697865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010993682,0.00054758677,0.00218204,0.00017711567,0.00014691417,0.0004073482,0.00023293853,0.81069845,0.03333039,0.04384795,0.004635661,0.10269423],"study_design_scores_gemma":[0.00006830391,0.00008203304,0.00026944146,0.000004231235,0.000016536345,0.000049758783,0.000016703943,0.98906136,0.003021306,0.0059160246,0.0014802495,0.000013996653],"about_ca_topic_score_codex":0.001755296,"about_ca_topic_score_gemma":0.0021575133,"teacher_disagreement_score":0.004309819,"about_ca_system_score_codex":0.0007710077,"about_ca_system_score_gemma":0.001280437,"threshold_uncertainty_score":0.014417827},"labels":[],"label_agreement":null},{"id":"W4205688508","doi":"10.1609/aimag.v42i2.15096","title":"Optimizing smart grid operations from the demand side","year":2021,"lang":"en","type":"article","venue":"AI Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Natural Science Foundation of China; Nanyang Technological University; National Research Foundation Singapore; National Science Council; National Research Foundation","keywords":"Electricity; Smart grid; Demand response; Process (computing); Computer science; Grid; Power demand; Electric power system; Power (physics); Demand side; Power consumption; Shutdown; Operations research; Dynamic demand; Power grid; Consumption (sociology); Business; Environmental economics; Engineering; Economics; Electrical engineering","score_opus":0.009474168610807864,"score_gpt":0.20554817983278792,"score_spread":0.19607401122198007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205688508","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8376576,0.00021591717,0.12768072,0.0011000413,0.00008835334,0.00020107276,0.0007023479,0.0043933624,0.027960546],"genre_scores_gemma":[0.99388945,0.000033486056,0.0049653724,0.00003411949,0.000006088095,0.000011544879,0.00015796641,0.000039488663,0.000862587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997029,0.00007456629,0.000018894802,0.000047202666,0.00010183998,0.00005454632],"domain_scores_gemma":[0.9995763,0.000097829434,0.000057752794,0.000094734765,0.00012592928,0.00004746223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052713434,0.00049414096,0.0002860735,0.00032866478,0.00028858086,0.0009196102,0.00037903225,0.0002249277,0.002214328],"category_scores_gemma":[0.00081760436,0.00015448574,0.00014372467,0.00039049404,0.0002584466,0.0010461401,0.0005329222,0.0003749182,0.0005278899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005785932,0.00038140963,0.021585606,0.00012491576,0.00007097016,0.00033083826,0.0002931035,0.6938542,0.06015782,0.005498357,0.0113809975,0.20574322],"study_design_scores_gemma":[0.000030264631,0.000100240795,0.0042490433,0.00000657864,0.000010095519,0.000021405074,0.00019357368,0.97633594,0.011828257,0.0027839171,0.0044280267,0.000012708287],"about_ca_topic_score_codex":0.004727212,"about_ca_topic_score_gemma":0.005691455,"teacher_disagreement_score":0.004727212,"about_ca_system_score_codex":0.0006088954,"about_ca_system_score_gemma":0.0006591069,"threshold_uncertainty_score":0.009399414},"labels":[],"label_agreement":null},{"id":"W4206057491","doi":"10.3390/en15030752","title":"Feasibility of Solar Grid-Based Industrial Virtual Power Plant for Optimal Energy Scheduling: A Case of Indian Power Sector","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Virtual power plant; Renewable energy; Distributed generation; Grid; Peaking power plant; Scheduling (production processes); Engineering; Reliability engineering; Automotive engineering; Computer science; Electrical engineering; Operations management","score_opus":0.026202412106070876,"score_gpt":0.22359333355805172,"score_spread":0.19739092145198084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206057491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9317489,0.00014055816,0.046156388,0.00042290744,0.000029364666,0.00006733412,0.00009498467,0.00014601178,0.021193523],"genre_scores_gemma":[0.9972205,0.000019793462,0.002254741,0.0000058375263,0.0000015932799,0.000004719067,0.000013924953,0.000003953912,0.00047490903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997545,0.00010991541,0.000006671365,0.000027662061,0.000037832928,0.000063497246],"domain_scores_gemma":[0.9997075,0.00014459988,0.000027894172,0.000029476281,0.00005272249,0.00003781795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005609382,0.00034291894,0.00033160378,0.00036067946,0.0005584978,0.0009963424,0.0006926176,0.00066359644,0.0018528636],"category_scores_gemma":[0.000853025,0.00018274816,0.0004982708,0.0004403831,0.0004537656,0.0005660858,0.0004466005,0.00041406642,0.000111627756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023332662,0.000103278304,0.0043923473,0.000055127162,0.000023344379,0.0012426719,0.00008710683,0.9749785,0.0025697902,0.006352484,0.00080165773,0.009160314],"study_design_scores_gemma":[0.000016627871,0.000045115095,0.0010119339,0.0000020124976,0.000008148214,0.000050641418,0.000117351454,0.99705625,0.00064817426,0.0008162579,0.00022229397,0.000005253873],"about_ca_topic_score_codex":0.021304525,"about_ca_topic_score_gemma":0.015025351,"teacher_disagreement_score":0.021304525,"about_ca_system_score_codex":0.0007409987,"about_ca_system_score_gemma":0.0008408893,"threshold_uncertainty_score":0.04236102},"labels":[],"label_agreement":null},{"id":"W4206080373","doi":"10.1109/tesc50295.2020.9656872","title":"Distributed Energy Resources Parameter Monitoring in Microgrids Using Blockchain and Edge Computing","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Blockchain; Computer science; Edge computing; Distributed computing; Enhanced Data Rates for GSM Evolution; Distributed generation; Computer security; Telecommunications; Renewable energy; Electrical engineering; Engineering","score_opus":0.017944251741020503,"score_gpt":0.20752456311187098,"score_spread":0.18958031137085046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206080373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33618835,0.0006863664,0.6487758,0.00050704076,0.00010971738,0.00023305272,0.00022386284,0.0014845986,0.011791062],"genre_scores_gemma":[0.97625446,0.000104116756,0.022486657,0.000020815805,0.000010188648,0.000037057256,0.000049076647,0.000012647646,0.0010248289],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994373,0.00019801031,0.000032207794,0.00012190664,0.00015010913,0.000060546005],"domain_scores_gemma":[0.99917656,0.0003558858,0.0000892307,0.00015326469,0.00015250446,0.00007264027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081424636,0.00037192524,0.0005501581,0.0004539482,0.00061021245,0.0009415765,0.0006690064,0.0005296799,0.0014770756],"category_scores_gemma":[0.0014773142,0.0002460634,0.0002383078,0.0005643107,0.00055010983,0.0016741968,0.0010673088,0.000452668,0.0002161983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010269757,0.00024921165,0.006533342,0.00021522022,0.00010118946,0.00046359623,0.00044937737,0.77248585,0.025971228,0.025057236,0.0014478852,0.16599879],"study_design_scores_gemma":[0.000027685654,0.00008453844,0.0005068361,0.000009873544,0.000008927306,0.00003880479,0.000038385664,0.98524255,0.0050372197,0.007737992,0.0012556522,0.0000115813855],"about_ca_topic_score_codex":0.0034180537,"about_ca_topic_score_gemma":0.0040706675,"teacher_disagreement_score":0.0034180537,"about_ca_system_score_codex":0.0005683865,"about_ca_system_score_gemma":0.00078617595,"threshold_uncertainty_score":0.0067963004},"labels":[],"label_agreement":null},{"id":"W4206312118","doi":"10.1109/tpwrd.2022.3140251","title":"A New Selection Tool of Retail Electric Provider for Prosumers With Local Distributed Resources and Plug-in Electric Vehicles","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaic system; Environmental economics; Plan (archaeology); Plug-in; Computer science; Business; Engineering; Electrical engineering","score_opus":0.005388307593978449,"score_gpt":0.17179192676908267,"score_spread":0.1664036191751042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206312118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07239919,0.00023893638,0.87808466,0.00067560055,0.00012971717,0.00105088,0.0020890336,0.017000273,0.028331725],"genre_scores_gemma":[0.32852462,0.00013364616,0.66107064,0.00017497235,0.000042842028,0.00049750134,0.0015913745,0.00037847675,0.0075858897],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988701,0.0003300053,0.00010571843,0.00021955521,0.00038668077,0.000087957145],"domain_scores_gemma":[0.9976084,0.001453186,0.00023389496,0.00014963739,0.00044691836,0.000107909764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016293483,0.0009658267,0.00057509827,0.0028015664,0.0006033533,0.0025000076,0.00082895625,0.0006882023,0.013717358],"category_scores_gemma":[0.00526189,0.0002954209,0.0007625773,0.0012574322,0.00028794355,0.0018944895,0.0006997362,0.0005136602,0.002061211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010224901,0.0009203258,0.032167163,0.0006378791,0.00015306118,0.001410782,0.00094843685,0.07157249,0.010978054,0.04561679,0.028824553,0.8057479],"study_design_scores_gemma":[0.00021092735,0.0004795872,0.008842808,0.00018568372,0.00016419114,0.00096682325,0.000899658,0.8836492,0.013777093,0.014167147,0.076539524,0.00011742249],"about_ca_topic_score_codex":0.0023069333,"about_ca_topic_score_gemma":0.0038455143,"teacher_disagreement_score":0.013717358,"about_ca_system_score_codex":0.00057295104,"about_ca_system_score_gemma":0.0010028544,"threshold_uncertainty_score":0.04588914},"labels":[],"label_agreement":null},{"id":"W4206389244","doi":"10.1109/access.2021.3133292","title":"A Nonintrusive Load Monitoring Based on Multi-Target Regression Approach","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Walailak University","keywords":"Computer science; Random forest; Benchmarking; Machine learning; Artificial intelligence; Aggregate (composite); Process (computing); Data mining; Data set; Artificial neural network; Data modeling; Hidden Markov model; Benchmark (surveying); Autoencoder","score_opus":0.033711723929018125,"score_gpt":0.27831914187422646,"score_spread":0.24460741794520835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206389244","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.093585804,0.00009867074,0.9020167,0.000120834564,0.000041213523,0.00012304861,0.00012206541,0.0017269304,0.0021647622],"genre_scores_gemma":[0.8268183,0.000084584935,0.17052606,0.000054447915,0.000024825204,0.0001720795,0.00021111646,0.00009201322,0.0020166258],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990607,0.00024134888,0.000035582125,0.0003039291,0.0002973941,0.00006108706],"domain_scores_gemma":[0.9994387,0.00019740083,0.00007769611,0.00010265407,0.00015670112,0.000026852515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009898131,0.0006428521,0.00084567844,0.0005527265,0.00031009328,0.00062127144,0.00085294613,0.00055124075,0.0013116478],"category_scores_gemma":[0.0015465815,0.00024412642,0.00046166085,0.00061494915,0.0002517296,0.0010406813,0.000656073,0.0007735198,0.0004984007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010228284,0.0009947204,0.008835757,0.0003206902,0.00017405105,0.00022362858,0.00028237293,0.4062931,0.14306958,0.0049623665,0.0017056621,0.43211514],"study_design_scores_gemma":[0.000012030241,0.00019897785,0.0016305038,0.0000037582497,0.000012270547,0.00002862873,0.000015462596,0.9805077,0.016470354,0.000513337,0.00059432344,0.0000126826535],"about_ca_topic_score_codex":0.0016658392,"about_ca_topic_score_gemma":0.0018371257,"teacher_disagreement_score":0.0016658392,"about_ca_system_score_codex":0.0003377332,"about_ca_system_score_gemma":0.00038827464,"threshold_uncertainty_score":0.0052346587},"labels":[],"label_agreement":null},{"id":"W4206424937","doi":"10.1109/pesgm46819.2021.9638017","title":"Demand Response Cooperative and Demand Charge","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Schedule; Demand response; Mathematical optimization; Operations research; Computer science; Electricity; Electricity market; Scheduling (production processes); Probabilistic logic; Piecewise linear function; Linear programming; Engineering; Mathematics","score_opus":0.011313333327400244,"score_gpt":0.22187354857078187,"score_spread":0.21056021524338162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206424937","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090615556,0.00038058124,0.81399035,0.0020611205,0.0002044514,0.00021937407,0.00038292402,0.00044597176,0.09169967],"genre_scores_gemma":[0.936433,0.00020734736,0.028721554,0.00039133296,0.00010756158,0.00015138814,0.00019537682,0.00008361993,0.033708803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832016,0.0005280672,0.000041099407,0.00035739673,0.00044046892,0.00031278277],"domain_scores_gemma":[0.9987502,0.0004361535,0.00023801424,0.0002019856,0.000263689,0.00010995579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00124368,0.00075321965,0.0006545678,0.00028706912,0.0005916514,0.0018159818,0.0017802633,0.0013856309,0.016575431],"category_scores_gemma":[0.0033357462,0.00034620063,0.00078966015,0.00074219017,0.0008820918,0.002836581,0.0017304799,0.0013525035,0.0017795338],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002751343,0.0002856092,0.0026088266,0.00021314084,0.000053376763,0.0007179804,0.00038570058,0.49524072,0.0053944313,0.43904197,0.0106705865,0.045112584],"study_design_scores_gemma":[0.00006799823,0.00030298388,0.0011165928,0.000019832976,0.000037640828,0.0005881405,0.00032363372,0.88223827,0.0021242036,0.08992581,0.023212971,0.000041887943],"about_ca_topic_score_codex":0.0028649892,"about_ca_topic_score_gemma":0.0020047077,"teacher_disagreement_score":0.016575431,"about_ca_system_score_codex":0.0012791771,"about_ca_system_score_gemma":0.0011875174,"threshold_uncertainty_score":0.05545032},"labels":[],"label_agreement":null},{"id":"W4206503412","doi":"10.1109/jsyst.2021.3132786","title":"New Real-Time Demand Response Market Co-Optimized With Conventional Energy Market","year":2022,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Procurement; Electricity market; Energy market; Business; Inefficiency; Market demand schedule; Market power; Social Welfare; Supply and demand; Electricity; Demand curve; Industrial organization; Factor market; Economics; Environmental economics; Microeconomics; Engineering; Marketing; Monopoly; Electrical engineering","score_opus":0.005956468335663657,"score_gpt":0.19352468484022112,"score_spread":0.18756821650455746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206503412","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064626485,0.00046665472,0.8965722,0.0008518713,0.00022118153,0.00021491978,0.00032974186,0.0004704911,0.03624653],"genre_scores_gemma":[0.86872774,0.0002669978,0.113907345,0.00024351894,0.00008435428,0.00017725743,0.00021300672,0.00019205747,0.016187675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992198,0.00026014386,0.000024528015,0.00014151802,0.00018894632,0.00016508269],"domain_scores_gemma":[0.9993094,0.00029049776,0.00009399824,0.000042294694,0.00019453927,0.00006924277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013752779,0.0008713964,0.0013525841,0.00055409473,0.00035610102,0.0020324732,0.0013898873,0.0011388047,0.0071877246],"category_scores_gemma":[0.0017644018,0.00053435605,0.00087744195,0.0007733075,0.00057310594,0.0021976596,0.0010842207,0.0012977566,0.0004587135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048318845,0.000057008,0.0001568029,0.00004634824,0.000016538477,0.000072954346,0.000017009328,0.97821474,0.00091303483,0.012605164,0.0013787164,0.0064734486],"study_design_scores_gemma":[0.000008550435,0.00001888868,0.000039394545,0.0000015774776,0.000004098363,0.000009471656,0.000006617619,0.99770975,0.00010817514,0.001518302,0.0005716023,0.0000035121684],"about_ca_topic_score_codex":0.004371272,"about_ca_topic_score_gemma":0.005490488,"teacher_disagreement_score":0.0071877246,"about_ca_system_score_codex":0.0013912116,"about_ca_system_score_gemma":0.0017237746,"threshold_uncertainty_score":0.024045348},"labels":[],"label_agreement":null},{"id":"W4210639342","doi":"10.1201/b11897-7","title":"Smart Grids","year":2012,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.01224850663436613,"score_gpt":0.16877256482007252,"score_spread":0.1565240581857064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210639342","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004049622,0.020595443,0.050200038,0.016412651,0.014100104,0.0004087279,0.008492579,0.009252773,0.876488],"genre_scores_gemma":[0.050397515,0.035386156,0.025680969,0.0053286976,0.0052909167,0.0004587646,0.016803157,0.0025530823,0.8581007],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992785,0.0001379117,0.000049369173,0.00016172114,0.0002939219,0.00007868561],"domain_scores_gemma":[0.9992526,0.00012284018,0.000042794207,0.00020454034,0.00028056014,0.00009671167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005691262,0.001039162,0.00069887814,0.0012258021,0.00093690434,0.004227316,0.0013553004,0.0018203391,0.24941353],"category_scores_gemma":[0.002293241,0.00041130214,0.0005771987,0.0021550448,0.0005151093,0.0051800003,0.0029939106,0.0017433298,0.1404898],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007764138,0.000033789864,0.00046078733,0.00057952874,0.000022295815,0.00015986207,0.0001432471,0.001385938,0.0013894074,0.07541586,0.6936538,0.22667798],"study_design_scores_gemma":[0.0000054113407,0.000013521484,0.00016297749,0.0001624296,0.000004852601,0.00012481184,0.0000678631,0.0005672979,0.00032774117,0.011773495,0.9867812,0.000008545144],"about_ca_topic_score_codex":0.0010332183,"about_ca_topic_score_gemma":0.0011406809,"teacher_disagreement_score":0.24941353,"about_ca_system_score_codex":0.001151637,"about_ca_system_score_gemma":0.0011927736,"threshold_uncertainty_score":0.8343714},"labels":[],"label_agreement":null},{"id":"W4210640944","doi":"10.1109/tia.2022.3146105","title":"Energy Not-Served-Based Method for Assessing Smart Grid Functions in Residential Loads","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Demand response; Load management; Grid; Peak demand; Transformer; Reliability engineering; Automotive engineering; Energy management; Computer science; Air conditioning; Smart meter; Engineering; Energy (signal processing); Electrical engineering; Electricity; Voltage; Mathematics; Mechanical engineering","score_opus":0.02309344651480718,"score_gpt":0.26863219782059755,"score_spread":0.24553875130579036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210640944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17477398,0.00032030506,0.80457836,0.000068480476,0.00016318826,0.00037221418,0.00081673847,0.0017406482,0.01716616],"genre_scores_gemma":[0.86502904,0.00014356976,0.12950312,0.000048520575,0.000023128,0.00030323755,0.0004923097,0.00010965064,0.0043474114],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872845,0.00031949946,0.00008627873,0.00013862769,0.00068231364,0.000044788903],"domain_scores_gemma":[0.9987865,0.000382191,0.0001189433,0.00014506473,0.0005285399,0.000038748298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000750732,0.00084142725,0.0004416403,0.0020751078,0.00044871832,0.00083604053,0.00054588926,0.00039658084,0.0023621616],"category_scores_gemma":[0.0025431653,0.00018080763,0.00025321334,0.0013046197,0.00029649938,0.0010279092,0.00049278676,0.00034812433,0.00078410684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013043042,0.0005587206,0.08221885,0.0008199893,0.00023104312,0.0005997445,0.0012705688,0.10061922,0.10889365,0.017681723,0.0053098127,0.6804924],"study_design_scores_gemma":[0.00007457543,0.0006822051,0.049958255,0.00010227889,0.00010639522,0.00069885614,0.0009808418,0.80800253,0.10746654,0.0076995683,0.024038434,0.00018952678],"about_ca_topic_score_codex":0.001969353,"about_ca_topic_score_gemma":0.0041480493,"teacher_disagreement_score":0.0023621616,"about_ca_system_score_codex":0.0004873187,"about_ca_system_score_gemma":0.000360527,"threshold_uncertainty_score":0.007902205},"labels":[],"label_agreement":null},{"id":"W4210683135","doi":"10.1002/oca.2862","title":"Building‐to‐grid optimal control of integrated MicroCSP and building HVAC system for optimal demand response services","year":2022,"lang":"en","type":"article","venue":"Optimal Control Applications and Methods","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"HVAC; Demand response; Renewable energy; Grid; Electric power system; Base load power plant; Dynamic demand; Computer science; Automotive engineering; Solar power; Distributed generation; Air conditioning; Power (physics); Engineering; Electrical engineering; Electricity; Mechanical engineering","score_opus":0.006578140422008411,"score_gpt":0.2771290677832138,"score_spread":0.27055092736120534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210683135","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5327079,0.00048158027,0.4317105,0.00055335666,0.00013870597,0.0003165667,0.0002923284,0.0007551867,0.03304388],"genre_scores_gemma":[0.9968479,0.000022122498,0.0023520594,0.000012778635,0.000005362858,0.000028686525,0.000015467784,0.0000047238855,0.00071087474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995363,0.00013396307,0.000016546453,0.00009513621,0.0001016189,0.00011646287],"domain_scores_gemma":[0.99941015,0.00026885665,0.00010972017,0.000022357686,0.00014294835,0.000045897923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008033159,0.0007963068,0.00075165473,0.00029907154,0.000577199,0.0013126383,0.00076431927,0.000685232,0.0033700461],"category_scores_gemma":[0.0007598237,0.00041596443,0.00042037742,0.00029370055,0.00058634975,0.00033923224,0.0007034205,0.0007963789,0.00020269066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017778836,0.00006121433,0.00045071938,0.000052209005,0.000027624395,0.00006923829,0.000029135941,0.98883677,0.0030142716,0.0012214148,0.00044732963,0.0056122686],"study_design_scores_gemma":[0.000011951456,0.00006799484,0.00021893959,0.0000026872715,0.000007800359,0.0000040035416,0.000010292723,0.9988508,0.0004895272,0.000205227,0.00012767297,0.0000031111892],"about_ca_topic_score_codex":0.01659956,"about_ca_topic_score_gemma":0.011830132,"teacher_disagreement_score":0.01659956,"about_ca_system_score_codex":0.0011231514,"about_ca_system_score_gemma":0.0010871099,"threshold_uncertainty_score":0.033005893},"labels":[],"label_agreement":null},{"id":"W4210771357","doi":"10.1109/pic53636.2021.9687026","title":"Double-Sided Auction Mechanism for Peer-to-Peer Energy Trading Markets","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Double auction; Mechanism design; Grid; Peer-to-peer; Smart grid; Incentive; Microeconomics; Electricity; Matching (statistics); Distributed generation; Environmental economics; Risk analysis (engineering); Business; Distributed computing; Economics; Common value auction; Renewable energy","score_opus":0.017694138400601456,"score_gpt":0.22155224169368457,"score_spread":0.2038581032930831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210771357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027119465,0.00027732854,0.96632963,0.00023288194,0.00014498897,0.00040553792,0.00009535879,0.00035515032,0.0050395345],"genre_scores_gemma":[0.8219509,0.0002519757,0.17159535,0.00014616108,0.000090213034,0.00045720296,0.000108644315,0.000063573905,0.0053360485],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956499,0.0018843393,0.00031394095,0.00071391294,0.0010086055,0.00042933074],"domain_scores_gemma":[0.996384,0.0015303288,0.0004938617,0.00069781084,0.0005242766,0.00036965043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046302257,0.0009488563,0.0022146758,0.00081241963,0.001135919,0.002882495,0.004802051,0.0024597112,0.0051793223],"category_scores_gemma":[0.007740843,0.0006040009,0.0013255406,0.001372385,0.0013347295,0.0043406878,0.0021727919,0.0017157788,0.00092275103],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001132868,0.0008453993,0.0010489945,0.00057724,0.0002987841,0.001268365,0.00043832642,0.41848844,0.012322155,0.45334744,0.0067470465,0.10348505],"study_design_scores_gemma":[0.00022966696,0.00026278215,0.00013010358,0.000019651792,0.00003714581,0.0004564838,0.00004455415,0.90056133,0.0017206364,0.09239999,0.0040824404,0.000055295764],"about_ca_topic_score_codex":0.00076161866,"about_ca_topic_score_gemma":0.00053309824,"teacher_disagreement_score":0.0051793223,"about_ca_system_score_codex":0.0011411346,"about_ca_system_score_gemma":0.001972452,"threshold_uncertainty_score":0.024487257},"labels":[],"label_agreement":null},{"id":"W4210784356","doi":"10.1109/globecom46510.2021.9685510","title":"A Multi-Agent Reinforcement Learning Approach for Blockchain-based Electricity Trading System","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Global Communications Conference (GLOBECOM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Blockchain; Reinforcement learning; Electricity; Smart contract; Stackelberg competition; Microgrid; Nash equilibrium; Distributed computing; Computer security; Microeconomics; Control (management); Artificial intelligence; Economics","score_opus":0.05022244698591615,"score_gpt":0.2621397734570107,"score_spread":0.21191732647109457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210784356","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048827887,0.0004921473,0.9406862,0.00045282772,0.000083001316,0.00010975605,0.00006124384,0.00046324256,0.0088235885],"genre_scores_gemma":[0.9643181,0.00013255718,0.032138627,0.00007568239,0.000022192153,0.000114659284,0.000044233177,0.000022843587,0.0031310522],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961275,0.00011280933,0.000019450248,0.00008381566,0.00008945527,0.00008178059],"domain_scores_gemma":[0.99941456,0.00026843813,0.00007342939,0.000034109504,0.00013533169,0.00007418649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007383839,0.00063316524,0.0010603887,0.00028479937,0.00073013,0.00072400563,0.0011917794,0.0008258444,0.0041567413],"category_scores_gemma":[0.0012900825,0.00031829314,0.00037517704,0.0002814748,0.00060813327,0.00080871023,0.0011681552,0.000883444,0.00034904107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058722126,0.000039168735,0.00039606242,0.000036853457,0.00002074356,0.00008983212,0.000040746443,0.97611517,0.00091916404,0.004778874,0.00048042857,0.017024139],"study_design_scores_gemma":[0.000008049048,0.000011898503,0.000022052785,0.0000012353426,0.0000022695071,0.0000046197956,0.0000030418985,0.99885726,0.000064643835,0.0008947777,0.00012859504,0.0000015842143],"about_ca_topic_score_codex":0.010043589,"about_ca_topic_score_gemma":0.008001075,"teacher_disagreement_score":0.010043589,"about_ca_system_score_codex":0.00074515224,"about_ca_system_score_gemma":0.0012651501,"threshold_uncertainty_score":0.019970238},"labels":[],"label_agreement":null},{"id":"W4210948880","doi":"10.32920/ryerson.14655963.v1","title":"Optimization models for distribution planning and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Sizing; Smart grid; Grid; Electric power distribution; Renewable energy; Electric power system; Operations research; Reliability engineering; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Voltage","score_opus":0.021714361631857776,"score_gpt":0.22361995749775462,"score_spread":0.20190559586589685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210948880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020613456,0.0022363618,0.9782227,0.0007472951,0.00013951826,0.000074490184,0.00038087412,0.00023345355,0.015903967],"genre_scores_gemma":[0.46637744,0.014853902,0.45712215,0.0005577913,0.0006777779,0.0014851962,0.0022716655,0.0004880878,0.056166045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900645,0.00046658824,0.00005393934,0.0001519436,0.00022464312,0.000096476375],"domain_scores_gemma":[0.99845123,0.0011293326,0.00012608562,0.000064967106,0.000194597,0.000033844794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013831931,0.0018937306,0.0014242614,0.00087049266,0.0006398055,0.002278552,0.0015486048,0.0017404974,0.008716178],"category_scores_gemma":[0.0031122067,0.0008523258,0.0012266712,0.0021068617,0.0009042469,0.0017178481,0.0009745966,0.002590738,0.001870019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017840168,0.00002242972,0.00014173883,0.00009264309,0.000030085066,0.000036941725,0.00003500836,0.90722215,0.00012944172,0.07307365,0.002796592,0.016401377],"study_design_scores_gemma":[0.0000073631945,0.000010151639,0.00004947823,0.000021624075,0.000008778559,0.00001247717,0.000012684867,0.9553885,0.00007298851,0.038136747,0.006272047,0.0000072451894],"about_ca_topic_score_codex":0.011772893,"about_ca_topic_score_gemma":0.010137697,"teacher_disagreement_score":0.011772893,"about_ca_system_score_codex":0.0025250139,"about_ca_system_score_gemma":0.0022219329,"threshold_uncertainty_score":0.029158473},"labels":[],"label_agreement":null},{"id":"W4211105564","doi":"10.1109/tpwrd.2022.3150256","title":"Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism With Transactive DERs","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Independent Electricity System Operator","funders":"Independent Electricity System Operator","keywords":"Distributed generation; Electric power system; Environmental economics; Demand response; Business; Electricity; Computer science; Economics; Engineering; Renewable energy; Power (physics)","score_opus":0.008738736263665507,"score_gpt":0.16641897528592103,"score_spread":0.15768023902225553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4211105564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02309679,0.00018615629,0.9686313,0.0001576948,0.000055967437,0.00020653018,0.00005151254,0.00027302938,0.007340981],"genre_scores_gemma":[0.9259385,0.00014273127,0.07085929,0.00004688848,0.000026940972,0.00013519984,0.000040824147,0.000023509965,0.0027861206],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985183,0.00063377706,0.00007775577,0.00027041355,0.00028742666,0.00021235777],"domain_scores_gemma":[0.9989792,0.000447378,0.00017375362,0.00013613842,0.00016558812,0.000098039534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019817897,0.00072220294,0.0009184132,0.00041867833,0.00041816177,0.0014161275,0.0022734518,0.00080357696,0.0033852502],"category_scores_gemma":[0.0022483103,0.0004399027,0.00068537117,0.0008223276,0.0007854904,0.0014769117,0.0012041103,0.0009515351,0.0003282718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024613566,0.00014183558,0.00040962815,0.00012356075,0.00007782214,0.00056328095,0.00013048749,0.87299097,0.004464456,0.08017159,0.0015011816,0.039179035],"study_design_scores_gemma":[0.000027342328,0.000063341155,0.000052493036,0.0000043343857,0.000011311457,0.000103663,0.000014766899,0.99087125,0.00066669856,0.0074526872,0.0007212392,0.000010928887],"about_ca_topic_score_codex":0.0018297187,"about_ca_topic_score_gemma":0.0022681248,"teacher_disagreement_score":0.0033852502,"about_ca_system_score_codex":0.0009908543,"about_ca_system_score_gemma":0.0016036395,"threshold_uncertainty_score":0.011324763},"labels":[],"label_agreement":null},{"id":"W4213055543","doi":"10.2139/ssrn.4011579","title":"Data Efficient Energy Disaggregation with Behind-the-Meter Energy Resources","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Metre; Energy (signal processing); Electricity meter; Business; Environmental science; Physics; Mathematics; Statistics","score_opus":0.0062353943177991585,"score_gpt":0.1777537055217314,"score_spread":0.17151831120393224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213055543","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10926328,0.0008437439,0.86343217,0.00064500014,0.00057234656,0.00013629602,0.0030693274,0.0048221406,0.017215684],"genre_scores_gemma":[0.93206817,0.000108578286,0.064312235,0.00009671254,0.00008388072,0.000024231573,0.0012459127,0.00011500945,0.0019452493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999616,0.000077878896,0.000031835403,0.00010074799,0.00011026563,0.00006322796],"domain_scores_gemma":[0.9993773,0.00018183155,0.00003477558,0.0002647491,0.00011118914,0.000030171395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005881705,0.0005460919,0.00094315986,0.00051705335,0.0004456955,0.0014175794,0.00060255686,0.00034298512,0.0036206774],"category_scores_gemma":[0.0019209324,0.00028271196,0.00036433697,0.0014353764,0.00026796115,0.0018257414,0.001110415,0.00061900093,0.00082142657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012416872,0.0003075944,0.005639734,0.00021291422,0.00019942319,0.00020505012,0.00023344813,0.5144846,0.021003217,0.022311168,0.017981417,0.41617975],"study_design_scores_gemma":[0.000026169717,0.00003798622,0.0013742696,0.000008768533,0.000023099054,0.000040519964,0.00006912466,0.9739546,0.0051757223,0.014030228,0.0052469275,0.000012495659],"about_ca_topic_score_codex":0.0050003813,"about_ca_topic_score_gemma":0.009635686,"teacher_disagreement_score":0.0050003813,"about_ca_system_score_codex":0.00041458933,"about_ca_system_score_gemma":0.0007315002,"threshold_uncertainty_score":0.012112379},"labels":[],"label_agreement":null},{"id":"W4214511582","doi":"10.1007/978-3-030-96592-1_6","title":"Characterization of Residential Electricity Customers via Deep Ensemble Learning","year":2022,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Identification (biology); Computer science; Ensemble learning; Classifier (UML); Consumption (sociology); Stock (firearms); Machine learning; Household income; Environmental economics; Ensemble forecasting; Demand response; Artificial intelligence; Engineering; Economics","score_opus":0.0034040364641537714,"score_gpt":0.19265634423942427,"score_spread":0.1892523077752705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214511582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6402786,0.00047702494,0.34643182,0.0004884632,0.00007260164,0.00003954932,0.001647476,0.0013568191,0.009207637],"genre_scores_gemma":[0.98202366,0.000108757944,0.012849715,0.000047467856,0.000041206466,0.000012407069,0.0014013151,0.000054225402,0.003461237],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998785,0.000022744172,0.0000053013546,0.000030292913,0.00002751667,0.000035663048],"domain_scores_gemma":[0.9997471,0.00009476785,0.000027210675,0.000036092937,0.00007563071,0.00001916821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002530432,0.00050519715,0.0003831462,0.00055093865,0.00017039152,0.0006067161,0.00047901453,0.0005670305,0.0016751073],"category_scores_gemma":[0.0007981049,0.00018741425,0.00035789682,0.0004927473,0.00012396468,0.0008211543,0.00034886092,0.0008075444,0.00082676957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043365252,0.0003136356,0.054088958,0.000041811698,0.000107662745,0.0002901045,0.00006838176,0.6296177,0.010665313,0.0033567483,0.011026826,0.28998926],"study_design_scores_gemma":[7.090017e-7,0.0000074384243,0.0021847552,0.0000017159978,0.0000033010767,0.000016776565,0.000009542876,0.99632156,0.00056549546,0.00071615685,0.00016968763,0.000002741184],"about_ca_topic_score_codex":0.0047247284,"about_ca_topic_score_gemma":0.007872124,"teacher_disagreement_score":0.0047247284,"about_ca_system_score_codex":0.00032822767,"about_ca_system_score_gemma":0.0002192647,"threshold_uncertainty_score":0.009394467},"labels":[],"label_agreement":null},{"id":"W4214722396","doi":"10.1109/tpwrs.2022.3153431","title":"A Conceptual Analysis of Equilibrium Bidding Strategy in a Combined Oligopoly and Oligopsony Wholesale Electricity Market","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Bidding; Oligopoly; Economics; Demand curve; Nash equilibrium; Pareto principle; Microeconomics; Mathematical economics; Partial equilibrium; Supply and demand; Game theory; Supply; Competition (biology); Computer science; General equilibrium theory; Cournot competition; Operations management","score_opus":0.010238596067931227,"score_gpt":0.20498869935868655,"score_spread":0.19475010329075532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214722396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021146026,0.00030095116,0.9331431,0.00045078833,0.00003703067,0.000097294476,0.00005995786,0.0000587939,0.04470617],"genre_scores_gemma":[0.75400454,0.0007351867,0.22644934,0.00016524726,0.00006640258,0.0004402555,0.00010688668,0.00008016467,0.017952003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99931407,0.00032520396,0.000023972005,0.000091254995,0.00017197672,0.000073546056],"domain_scores_gemma":[0.9995065,0.00022450747,0.000053888885,0.00003934872,0.00013388743,0.00004191755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011203854,0.0005208046,0.00050323986,0.0008195654,0.000713005,0.002078718,0.0013866376,0.0008629551,0.007916903],"category_scores_gemma":[0.001982147,0.0005205579,0.001035473,0.0007939281,0.0016053062,0.0029843934,0.00093343435,0.0009706352,0.00085284293],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008253083,0.000024119976,0.00014323516,0.00003658679,0.000010904579,0.00006868082,0.00014298772,0.049071737,0.00066766224,0.94536173,0.00045669096,0.004007416],"study_design_scores_gemma":[0.000014344061,0.00004733204,0.00021381081,0.00003077418,0.00001402154,0.00012182991,0.00020711862,0.56574434,0.00037997455,0.4258209,0.0073860046,0.000019607876],"about_ca_topic_score_codex":0.0024929128,"about_ca_topic_score_gemma":0.0017584395,"teacher_disagreement_score":0.007916903,"about_ca_system_score_codex":0.0019036633,"about_ca_system_score_gemma":0.0018182781,"threshold_uncertainty_score":0.026484668},"labels":[],"label_agreement":null},{"id":"W4214817779","doi":"10.36227/techrxiv.19282859.v1","title":"Energy Scheduling in IoE-Enabled Smart Grids Using Probabilistic Delayed Double Deep Q-Learning (P3DQL) Algorithm","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Probabilistic logic; Algorithm; Artificial intelligence; Smart grid; Dimensionality reduction; Deep learning; Scheduling (production processes); Curse of dimensionality; Machine learning; Mathematical optimization; Mathematics; Engineering; Electrical engineering","score_opus":0.01598730054866467,"score_gpt":0.22789439138229092,"score_spread":0.21190709083362624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214817779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030281382,0.00032179183,0.96586365,0.00037709458,0.000063855936,0.00006041701,0.00006373735,0.00067264395,0.0022953239],"genre_scores_gemma":[0.8600506,0.00013703806,0.1363998,0.0003405553,0.000039034207,0.000098544726,0.00015913983,0.000054577074,0.002720606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975115,0.000057778267,0.000016081027,0.00006384417,0.000056451085,0.000054615946],"domain_scores_gemma":[0.99936205,0.00033262032,0.00006148476,0.000037387934,0.00015806238,0.00004842665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009387638,0.0004615416,0.000738081,0.0003278705,0.00027300676,0.00070885825,0.000924582,0.0006944309,0.0020543388],"category_scores_gemma":[0.001957206,0.00028266478,0.00030688578,0.00035237914,0.0004632412,0.00074998516,0.00083183136,0.0008340978,0.00026053298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012789456,0.000082403116,0.0015749343,0.000056409244,0.000026085947,0.000050563573,0.000043583288,0.88741857,0.0011597641,0.0031548005,0.001680994,0.10462397],"study_design_scores_gemma":[0.000011370473,0.0000125604965,0.000058850805,0.0000020942107,0.0000018904017,0.0000052182127,0.0000033070967,0.9987594,0.00018171097,0.0008109032,0.00015121714,0.000001471755],"about_ca_topic_score_codex":0.007944745,"about_ca_topic_score_gemma":0.0075284024,"teacher_disagreement_score":0.007944745,"about_ca_system_score_codex":0.0006740351,"about_ca_system_score_gemma":0.0014947654,"threshold_uncertainty_score":0.01579696},"labels":[],"label_agreement":null},{"id":"W4220696591","doi":"10.3390/en15072482","title":"Investigation and Field Measurements for Demand Side Management Control Technique of Smart Air Conditioners located at Residential, Commercial, and Industrial Sites","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Thermostat; Air conditioning; Power-line communication; Transformer; Automotive engineering; Engineering; Electrical engineering; Voltage; Temperature control; Power consumption; Telecommunications; Power (physics); Control engineering; Mechanical engineering","score_opus":0.030789627629599307,"score_gpt":0.21812896500107412,"score_spread":0.18733933737147482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220696591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9942468,0.000029459381,0.0042590103,0.000022318412,0.000006692562,0.00002217212,0.00021167207,0.00006486514,0.0011370842],"genre_scores_gemma":[0.99845684,0.000026287784,0.0009030017,0.00000803144,0.0000034454094,0.000011506899,0.00011885076,0.000004110705,0.0004678309],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9997446,0.000038142083,0.000007485394,0.00006452189,0.000111578905,0.000033623182],"domain_scores_gemma":[0.99955255,0.00012508269,0.000060904596,0.000036566344,0.00020206654,0.000022788423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014960385,0.00022615583,0.00018917822,0.00028018374,0.00023160735,0.00015954032,0.00019657493,0.0002704152,0.0007657271],"category_scores_gemma":[0.0003808589,0.00009361074,0.00008970576,0.00024756428,0.00017359678,0.00021637276,0.00012319577,0.00018681087,0.00021946213],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012517743,0.00078607816,0.23698297,0.00030533745,0.00005524986,0.0007389226,0.0014896046,0.009271305,0.6488085,0.00035217637,0.001927177,0.09803086],"study_design_scores_gemma":[0.00007506895,0.0029833158,0.6740231,0.00003348188,0.00008619429,0.0011867856,0.0031635861,0.038706947,0.27504602,0.00038557357,0.00425861,0.00005137912],"about_ca_topic_score_codex":0.001227443,"about_ca_topic_score_gemma":0.0023029558,"teacher_disagreement_score":0.001227443,"about_ca_system_score_codex":0.0001475371,"about_ca_system_score_gemma":0.000095119576,"threshold_uncertainty_score":0.0025616288},"labels":[],"label_agreement":null},{"id":"W4220926473","doi":"10.1155/2022/5486948","title":"The Network Global Optimal Mapping Approach Utilizing a Discrete Firefly Optimization Algorithm","year":2022,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Firefly algorithm; Computer science; Affine transformation; Global optimization; Algorithm; Global Map; Set (abstract data type); Artificial neural network; Transformation (genetics); Function (biology); Local search (optimization); Mathematical optimization; Artificial intelligence; Mathematics; Particle swarm optimization","score_opus":0.0072625541973679614,"score_gpt":0.20681032405337726,"score_spread":0.1995477698560093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220926473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035553097,0.000095374955,0.99421823,0.00007757997,0.000025569232,0.000025097239,0.000011559045,0.00012616345,0.0018649413],"genre_scores_gemma":[0.34414592,0.00030028797,0.64776504,0.00013789718,0.000059119662,0.00034921392,0.00010647417,0.000107811065,0.007028207],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976915,0.00006337923,0.000009400111,0.000054167613,0.00007533902,0.000028560637],"domain_scores_gemma":[0.99985003,0.000060179198,0.000022165117,0.000015177669,0.000039801937,0.000012602497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005670435,0.0009070698,0.0008370872,0.0006949284,0.00048089048,0.00075633585,0.0011101664,0.0008407187,0.0019236268],"category_scores_gemma":[0.0008431857,0.0003436743,0.0007203844,0.0005786262,0.00050049135,0.0010951635,0.00092025404,0.00087150227,0.00026373574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002373896,0.000025427124,0.00025857153,0.00003860813,0.00003243843,0.000027166881,0.00004502797,0.94336486,0.0017338097,0.011258319,0.00086065585,0.042331316],"study_design_scores_gemma":[0.0000037398872,0.000010810006,0.000026513564,0.0000021925193,0.0000035071625,0.000007984325,0.0000048040524,0.99784625,0.00027376504,0.0013674045,0.00045032045,0.0000028317188],"about_ca_topic_score_codex":0.006380214,"about_ca_topic_score_gemma":0.0043702424,"teacher_disagreement_score":0.006380214,"about_ca_system_score_codex":0.00080940797,"about_ca_system_score_gemma":0.0013648402,"threshold_uncertainty_score":0.012686133},"labels":[],"label_agreement":null},{"id":"W4221135459","doi":"10.1002/9781119078166.ch11","title":"Reinforcement Learning‐Based Filter","year":2022,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Reinforcement learning; Inference; Computer science; Artificial intelligence; Reinforcement; Equivalence (formal languages); Maximization; Machine learning; Unsupervised learning; Mathematical optimization; Mathematics; Engineering","score_opus":0.007194081828015181,"score_gpt":0.18051730712349884,"score_spread":0.17332322529548366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221135459","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023973018,0.00054648,0.9864792,0.00021720811,0.00012099072,0.000031848896,0.000059768307,0.0003585257,0.009788647],"genre_scores_gemma":[0.70525306,0.002757891,0.24157044,0.0006154016,0.00037947306,0.00040802683,0.00050540443,0.00025555663,0.048254713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996057,0.000089255744,0.00002186843,0.00010192102,0.00012853662,0.000052663505],"domain_scores_gemma":[0.999411,0.00033718505,0.00004218012,0.000046655707,0.00013639797,0.000026631833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008147555,0.0007162921,0.0010586996,0.00032851944,0.0003695553,0.00123828,0.00087021117,0.0009945385,0.009574382],"category_scores_gemma":[0.0027273563,0.00025526452,0.00050048303,0.000399012,0.00066007907,0.0008485047,0.00076482823,0.0014186173,0.0017817349],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009981556,0.00007190693,0.00050057407,0.00018148188,0.00007532836,0.00007578693,0.00005848044,0.6857392,0.0035059582,0.1199787,0.0069377446,0.18277502],"study_design_scores_gemma":[0.000013534677,0.000026044376,0.00008963292,0.000014864425,0.00000954451,0.000018136358,0.0000037156703,0.9787011,0.0006461355,0.016939845,0.0035299726,0.0000074022378],"about_ca_topic_score_codex":0.004700043,"about_ca_topic_score_gemma":0.0039039967,"teacher_disagreement_score":0.009574382,"about_ca_system_score_codex":0.0008825185,"about_ca_system_score_gemma":0.0010372887,"threshold_uncertainty_score":0.03202951},"labels":[],"label_agreement":null},{"id":"W4224032255","doi":"10.1016/j.rser.2022.112446","title":"A review on the deployment of demand response programs with multiple aspects coexistence over smart grid platform","year":2022,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; École de Technologie Supérieure","funders":"","keywords":"Interdependence; Software deployment; Demand response; Computer science; Risk analysis (engineering); Process (computing); Domain (mathematical analysis); Smart grid; Order (exchange); Control (management); Process management; Management science; Operations research; Business; Engineering; Electricity","score_opus":0.03770221934989955,"score_gpt":0.2544881190819007,"score_spread":0.21678589973200119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224032255","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003262933,0.9959722,0.0007882199,0.00026819814,0.00027421184,0.000017458551,0.000056911744,0.000016311631,0.0022801962],"genre_scores_gemma":[0.0019362293,0.9960969,0.00084026187,0.00020281554,0.0001415967,0.000013523505,0.0000626067,0.0000046998794,0.0007013658],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965596,0.000060526632,0.000047870464,0.00006430891,0.00013935677,0.000032001266],"domain_scores_gemma":[0.99925965,0.0004147523,0.00010042847,0.000025193103,0.00017497856,0.000025035984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007124423,0.00091051625,0.0011224974,0.0017747977,0.00020974404,0.0011122433,0.000902644,0.00087140716,0.004534898],"category_scores_gemma":[0.0013264669,0.00033430694,0.00067689543,0.002512012,0.00021308535,0.0014695025,0.00058224594,0.00084236416,0.001290378],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007297662,0.00007681581,0.00016953127,0.02953782,0.00010410389,0.00009331564,0.000041235562,0.0007905631,0.0019121486,0.004621462,0.01964925,0.94293076],"study_design_scores_gemma":[0.00001980606,0.0002460145,0.0009824003,0.010352242,0.00034217254,0.0005130435,0.00007923573,0.00044345943,0.0012648721,0.0019572766,0.98376596,0.000033431064],"about_ca_topic_score_codex":0.0014187915,"about_ca_topic_score_gemma":0.002137728,"teacher_disagreement_score":0.004534898,"about_ca_system_score_codex":0.0004215231,"about_ca_system_score_gemma":0.001360472,"threshold_uncertainty_score":0.015170753},"labels":[],"label_agreement":null},{"id":"W4224136647","doi":"10.1109/tpec54980.2022.9750797","title":"A Data-driven Assessment Model for Demand Response Participation Benefit of Industries","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Engineering and Physical Sciences Research Council; Science Foundation Ireland","keywords":"Flexibility (engineering); Demand response; Computer science; Work (physics); Smart grid; Audit; Factory (object-oriented programming); Operator (biology); Cluster analysis; Load profile; Process (computing); Operations research; Environmental economics; Electricity; Business; Engineering; Electrical engineering; Economics","score_opus":0.07556801493023511,"score_gpt":0.3081731073991687,"score_spread":0.23260509246893357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224136647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09460799,0.00030298185,0.87587446,0.0013860248,0.00007965668,0.00025494682,0.0015060001,0.0005514164,0.025436448],"genre_scores_gemma":[0.9585648,0.00017374869,0.028474655,0.000116865696,0.000021462067,0.00034813906,0.0005735528,0.00007082654,0.011655873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932814,0.00021755112,0.00002699229,0.00017018736,0.0001304124,0.00012663567],"domain_scores_gemma":[0.998489,0.00085616775,0.00017316363,0.000053575182,0.00035782467,0.00007027639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018837318,0.0009232998,0.000774272,0.0006364911,0.0004422191,0.0018448498,0.0018842437,0.002013649,0.0065869754],"category_scores_gemma":[0.0031711238,0.0007537061,0.0008600328,0.00078358134,0.00071464817,0.0015042559,0.001033057,0.0016904661,0.00067914644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020681933,0.00001463992,0.00036041657,0.000018042734,0.000007635361,0.00003166357,0.000017826238,0.9928088,0.00018980667,0.0041375905,0.00031323356,0.002079667],"study_design_scores_gemma":[0.0000016262949,0.000005231702,0.00006808595,0.0000024801868,0.0000020795114,0.0000032066384,0.0000052238247,0.99884135,0.000052946965,0.00087059714,0.00014469562,0.0000024926046],"about_ca_topic_score_codex":0.022638535,"about_ca_topic_score_gemma":0.015274729,"teacher_disagreement_score":0.022638535,"about_ca_system_score_codex":0.0023406749,"about_ca_system_score_gemma":0.0019372947,"threshold_uncertainty_score":0.045013547},"labels":[],"label_agreement":null},{"id":"W4224254674","doi":"10.3390/jrfm15040168","title":"What If? Electricity as Money","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Economics; Intermediation; Context (archaeology); Environmental economics; Business; Energy transition; Incentive; Industrial organization; Commerce; Microeconomics; Engineering; Finance; Electrical engineering","score_opus":0.0036650668612654685,"score_gpt":0.17730861384611574,"score_spread":0.17364354698485027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224254674","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026192313,0.019735876,0.010942685,0.38062674,0.0058599976,0.00003328542,0.0003237925,0.00009172895,0.55619353],"genre_scores_gemma":[0.8622526,0.0205669,0.0028866061,0.026354972,0.0044338414,0.00006450813,0.00012241013,0.00007813357,0.08323997],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993986,0.00025041506,0.000017318265,0.000096632684,0.00015571552,0.000081334474],"domain_scores_gemma":[0.99954623,0.00017939179,0.00006286461,0.000059131296,0.00008786456,0.00006445792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074606633,0.00019673599,0.00022488824,0.00046886966,0.0012504214,0.0044654645,0.0004326113,0.002216354,0.009090736],"category_scores_gemma":[0.0037911227,0.00008526548,0.0001476204,0.0006094739,0.005182512,0.007511317,0.0010515037,0.0020074416,0.0012362065],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009759276,0.000004574395,0.00026908235,0.000016935668,0.0000021843775,0.000053502616,0.00024343503,0.0001598439,0.000037263464,0.97764605,0.012841823,0.008715536],"study_design_scores_gemma":[0.0000057120765,0.000011726301,0.00045149357,0.00016168127,0.0000039195866,0.00010751955,0.0006524243,0.00039357942,0.000108481654,0.7142723,0.28382173,0.000009312823],"about_ca_topic_score_codex":0.0022768031,"about_ca_topic_score_gemma":0.0019017517,"teacher_disagreement_score":0.009090736,"about_ca_system_score_codex":0.0017588148,"about_ca_system_score_gemma":0.0011515932,"threshold_uncertainty_score":0.030411482},"labels":[],"label_agreement":null},{"id":"W4225015109","doi":"10.1016/j.ijepes.2022.108196","title":"Hierarchical economic control of air-conditioning loads to compensate for fluctuations in distributed photovoltaic generation","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Scheduling (production processes); Photovoltaic system; Computer science; Demand response; Automatic Generation Control; Mathematical optimization; Engineering; Electric power system; Electricity; Power (physics); Electrical engineering","score_opus":0.007246212863560143,"score_gpt":0.2236387530604243,"score_spread":0.21639254019686416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225015109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31303212,0.0003138863,0.66105175,0.0004922238,0.00018852238,0.00010888571,0.00011726034,0.0007250915,0.023970313],"genre_scores_gemma":[0.9973572,0.00001254839,0.002032626,0.000012700472,0.000007887632,0.0000062601403,0.000007994862,0.000006586857,0.0005563479],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996791,0.00008321621,0.000015135414,0.00006113433,0.00007736392,0.00008407694],"domain_scores_gemma":[0.99946207,0.00021521487,0.00007895424,0.00004166464,0.00016161932,0.00004051063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071398955,0.0004395045,0.00045314984,0.0002994273,0.0004894219,0.0010393996,0.00086586794,0.00036895857,0.0027406146],"category_scores_gemma":[0.0013221665,0.00024619646,0.00025542374,0.00025654642,0.00047191582,0.00060144713,0.0005833763,0.00052257784,0.00021976829],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021893292,0.0001709635,0.0006611117,0.000039900813,0.000043300646,0.000062026906,0.00006123953,0.9450367,0.0072948076,0.01307347,0.001119765,0.032217626],"study_design_scores_gemma":[0.000008495054,0.000022723538,0.00033072787,0.0000011400572,0.0000050985564,0.0000034728837,0.0000063594985,0.9974293,0.00055506005,0.001511752,0.00012310183,0.0000027543813],"about_ca_topic_score_codex":0.005458718,"about_ca_topic_score_gemma":0.009135287,"teacher_disagreement_score":0.005458718,"about_ca_system_score_codex":0.00089146727,"about_ca_system_score_gemma":0.0006080163,"threshold_uncertainty_score":0.010853887},"labels":[],"label_agreement":null},{"id":"W4225565544","doi":"10.1109/access.2022.3162587","title":"Stacking Battery Energy Storage Revenues in Future Distribution Networks","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nortel (Canada)","funders":"Interreg; European Commission","keywords":"Profitability index; Revenue; Payback period; Computer science; Scheduling (production processes); Sizing; Stacking; Service (business); Capital cost; Environmental economics; Business; Reliability engineering; Operations research; Risk analysis (engineering); Operations management; Economics; Finance; Engineering; Microeconomics; Production (economics); Electrical engineering; Marketing","score_opus":0.008602643849605992,"score_gpt":0.2120408743097336,"score_spread":0.2034382304601276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225565544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7535832,0.0010307202,0.19320074,0.00085005385,0.00008926628,0.0001076024,0.00036051706,0.00044982712,0.050327998],"genre_scores_gemma":[0.9944435,0.00013228747,0.004111957,0.00001063817,0.000004662682,0.000007810795,0.00002801315,0.0000112778225,0.001249869],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996804,0.00010764885,0.000008479269,0.000031346965,0.000089462344,0.00008271587],"domain_scores_gemma":[0.9997036,0.00011274955,0.000050676274,0.000022506918,0.00007788668,0.000032555683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007544646,0.00034604818,0.00034355832,0.00039312485,0.0003453207,0.0013647954,0.0006802781,0.0003859604,0.0020201441],"category_scores_gemma":[0.0011592921,0.0002153634,0.0002958984,0.0004515658,0.00046597247,0.0014754527,0.00052209495,0.00049895473,0.00020339129],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071714334,0.000024840105,0.0015762341,0.00002593131,0.000012594668,0.00021637563,0.000027668519,0.9595809,0.0017398645,0.01788084,0.0005891347,0.018254025],"study_design_scores_gemma":[0.000012044799,0.000094831885,0.0020130542,0.000015423804,0.00001870188,0.00008360525,0.00015988275,0.9790044,0.002078361,0.01387911,0.002621332,0.000019266598],"about_ca_topic_score_codex":0.008854044,"about_ca_topic_score_gemma":0.015950633,"teacher_disagreement_score":0.008854044,"about_ca_system_score_codex":0.0025020228,"about_ca_system_score_gemma":0.0012301127,"threshold_uncertainty_score":0.018153548},"labels":[],"label_agreement":null},{"id":"W4226169936","doi":"10.22215/etd/2022-14871","title":"Evaluation of High-Rise Building-Based Hydroelectric Systems for Improving Energy Efficiency at the Urban Scale","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Government of Canada","keywords":"Hydroelectricity; Cost of electricity by source; Electricity; Pumped-storage hydroelectricity; Turbine; Environmental science; Electricity generation; Engineering; Environmental engineering; Efficient energy use; Civil engineering; Renewable energy; Distributed generation; Power (physics); Electrical engineering; Mechanical engineering","score_opus":0.0073843871019292455,"score_gpt":0.22272990962890557,"score_spread":0.21534552252697634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226169936","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98328215,0.00013649683,0.00903192,0.00006327777,0.00001135823,0.0000779908,0.00010473063,0.000076310665,0.007215671],"genre_scores_gemma":[0.99596536,0.00013234645,0.0028730778,0.000004067048,0.0000010863778,0.000019969402,0.00004437505,0.0000061305204,0.0009534673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977106,0.000068137306,0.000006889096,0.000025804231,0.00009273692,0.000035316516],"domain_scores_gemma":[0.9997806,0.000105142746,0.000021042912,0.000023393959,0.00005148132,0.000018340043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038348767,0.00031282037,0.00036146873,0.00021869116,0.00023060653,0.00067176,0.00046832318,0.00038953978,0.00149006],"category_scores_gemma":[0.0005439003,0.00017765145,0.00034463362,0.00036732206,0.00023440275,0.00057618157,0.0003848112,0.0003585544,0.00023907563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058093935,0.0006045736,0.0053855414,0.0003378947,0.000056331897,0.0001647325,0.000086312706,0.87821573,0.06292844,0.0030383507,0.00042954605,0.04817165],"study_design_scores_gemma":[0.00012437179,0.0029804357,0.0094003,0.000028649625,0.000087779794,0.000050976985,0.00033710926,0.888713,0.094612986,0.000757714,0.0028782038,0.000028447203],"about_ca_topic_score_codex":0.0029129593,"about_ca_topic_score_gemma":0.004652912,"teacher_disagreement_score":0.0029129593,"about_ca_system_score_codex":0.0008259793,"about_ca_system_score_gemma":0.0005427201,"threshold_uncertainty_score":0.005992949},"labels":[],"label_agreement":null},{"id":"W4230024542","doi":"10.4018/978-1-7998-9152-9.ch017","title":"Economically Optimal Solar Power Generation","year":2021,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Agriculture Environmental Renewal Canada (Canada); University of Ottawa","funders":"","keywords":"Electricity; Profitability index; Grid parity; Stand-alone power system; Renewable energy; Environmental economics; Electricity retailing; Electricity generation; Installation; Consumption (sociology); Business; Solar power; Photovoltaic system; Electrical engineering; Engineering; Economics; Power (physics); Finance; Electricity market; Distributed generation; Mechanical engineering","score_opus":0.01194774886580309,"score_gpt":0.19161617236130946,"score_spread":0.17966842349550638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230024542","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02522332,0.009039908,0.07471562,0.0030399193,0.00038784038,0.00004522668,0.000569178,0.00017181647,0.8868072],"genre_scores_gemma":[0.86204225,0.0073894872,0.013615554,0.00021414123,0.00014255077,0.00004157974,0.00029096336,0.0000731252,0.11619027],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998838,0.000033882494,0.0000025716492,0.000017339185,0.000043663105,0.00001878962],"domain_scores_gemma":[0.9999219,0.00004190966,0.0000052435284,0.000010839084,0.0000127929925,0.0000072971843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016823468,0.0003198817,0.00025846783,0.00023255352,0.00027034097,0.0013738981,0.0004388382,0.0005554503,0.013785528],"category_scores_gemma":[0.00048539773,0.00020843426,0.00020941375,0.000484401,0.00037019543,0.0007986546,0.00041785574,0.0005759279,0.0016038448],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010168679,0.00007413226,0.0006259065,0.0002414475,0.000023233237,0.00021300922,0.00007928542,0.18174513,0.0023735808,0.58034295,0.0400507,0.19412895],"study_design_scores_gemma":[0.000036088124,0.00006398063,0.0014351568,0.00020100296,0.000023838105,0.00023205102,0.0003209457,0.19053593,0.0018512927,0.6263363,0.1789336,0.00002988674],"about_ca_topic_score_codex":0.0021861962,"about_ca_topic_score_gemma":0.008022207,"teacher_disagreement_score":0.013785528,"about_ca_system_score_codex":0.0013553881,"about_ca_system_score_gemma":0.00081965124,"threshold_uncertainty_score":0.046117246},"labels":[],"label_agreement":null},{"id":"W4230072215","doi":"10.32920/ryerson.14655963","title":"Optimization models for distribution planning and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Sizing; Smart grid; Grid; Electric power distribution; Renewable energy; Electric power system; Operations research; Reliability engineering; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Voltage","score_opus":0.021714361631857776,"score_gpt":0.22361995749775462,"score_spread":0.20190559586589685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230072215","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020613456,0.0022363618,0.9782227,0.0007472951,0.00013951826,0.000074490184,0.00038087412,0.00023345355,0.015903967],"genre_scores_gemma":[0.46637744,0.014853902,0.45712215,0.0005577913,0.0006777779,0.0014851962,0.0022716655,0.0004880878,0.056166045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900645,0.00046658824,0.00005393934,0.0001519436,0.00022464312,0.000096476375],"domain_scores_gemma":[0.99845123,0.0011293326,0.00012608562,0.000064967106,0.000194597,0.000033844794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013831931,0.0018937306,0.0014242614,0.00087049266,0.0006398055,0.002278552,0.0015486048,0.0017404974,0.008716178],"category_scores_gemma":[0.0031122067,0.0008523258,0.0012266712,0.0021068617,0.0009042469,0.0017178481,0.0009745966,0.002590738,0.001870019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017840168,0.00002242972,0.00014173883,0.00009264309,0.000030085066,0.000036941725,0.00003500836,0.90722215,0.00012944172,0.07307365,0.002796592,0.016401377],"study_design_scores_gemma":[0.0000073631945,0.000010151639,0.00004947823,0.000021624075,0.000008778559,0.00001247717,0.000012684867,0.9553885,0.00007298851,0.038136747,0.006272047,0.0000072451894],"about_ca_topic_score_codex":0.011772893,"about_ca_topic_score_gemma":0.010137697,"teacher_disagreement_score":0.011772893,"about_ca_system_score_codex":0.0025250139,"about_ca_system_score_gemma":0.0022219329,"threshold_uncertainty_score":0.029158473},"labels":[],"label_agreement":null},{"id":"W4232338362","doi":"10.32920/ryerson.14645877.v1","title":"Demand side management in smart grid","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Smart grid; HVAC; Peak demand; Grid; Load shifting; Demand side; Computer science; Load management; Electricity; Reduction (mathematics); Consumption (sociology); Demand management; Environmental economics; Economics; Air conditioning; Electrical engineering; Engineering; Mathematics","score_opus":0.010109723238308369,"score_gpt":0.20348612704084962,"score_spread":0.19337640380254126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232338362","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12452765,0.0029245485,0.82312655,0.0018421155,0.0004682371,0.00014903201,0.0003815212,0.0024239507,0.044156436],"genre_scores_gemma":[0.959341,0.0007272105,0.028832229,0.00018873515,0.00011824155,0.000042092026,0.00017288089,0.000095522344,0.010482067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998216,0.000052213993,0.000009088388,0.00003765394,0.000053381198,0.000026128702],"domain_scores_gemma":[0.9998759,0.00003957322,0.000015165473,0.000020150319,0.000038410148,0.00001085406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021367618,0.00030625972,0.00033268103,0.00013548667,0.000291467,0.0007731557,0.00034098348,0.000397772,0.0038218067],"category_scores_gemma":[0.00024436976,0.00014496836,0.00023198174,0.00029994873,0.00020415915,0.0008719192,0.00041125822,0.0004314281,0.0007809924],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055392756,0.0002780718,0.002847767,0.0005585479,0.00007804724,0.00078765396,0.00023737719,0.54336005,0.049776163,0.0639378,0.026201418,0.31138325],"study_design_scores_gemma":[0.000027150298,0.00010396028,0.00060758536,0.000016700433,0.000017112427,0.00016568552,0.00008315633,0.9511526,0.0096087735,0.01980082,0.01840091,0.000015543255],"about_ca_topic_score_codex":0.001226118,"about_ca_topic_score_gemma":0.0012460111,"teacher_disagreement_score":0.0038218067,"about_ca_system_score_codex":0.00037277894,"about_ca_system_score_gemma":0.00028488954,"threshold_uncertainty_score":0.012785256},"labels":[],"label_agreement":null},{"id":"W4233104126","doi":"10.1016/j.rser.2015.01.046","title":"Home energy management systems: A review of modelling and complexity","year":2015,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":445,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Energy management; Operations research; Demand response; Scheduling (production processes); Energy consumption; Production (economics); Heuristic; Risk analysis (engineering); Energy management system; Smart grid; Electricity; Environmental economics; Engineering; Energy (signal processing); Operations management; Economics; Business","score_opus":0.055698009751168474,"score_gpt":0.26242148136257565,"score_spread":0.20672347161140717,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233104126","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003978984,0.99124616,0.0047807684,0.00081720424,0.00029418565,0.000013700703,0.000063415784,0.000032242053,0.002354365],"genre_scores_gemma":[0.0032777588,0.9925062,0.0030069575,0.00023399877,0.00034703364,0.000015345597,0.00007107937,0.0000075920875,0.00053400634],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99938273,0.00010322417,0.00009872836,0.00010217815,0.0002820188,0.000031040076],"domain_scores_gemma":[0.9982151,0.0011802143,0.00016583872,0.0000672438,0.00033675056,0.00003489524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013188965,0.0013293207,0.0021524224,0.0023671316,0.0003283212,0.0024166084,0.0015961614,0.0015976126,0.0030417542],"category_scores_gemma":[0.0025736159,0.0006220692,0.00088610884,0.003904523,0.0009161863,0.0038728735,0.0011597323,0.0013728772,0.0011844396],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004779082,0.000104160805,0.00044729907,0.029132318,0.0001047833,0.00009625016,0.00012132561,0.00954614,0.001421645,0.030370858,0.019407278,0.90920025],"study_design_scores_gemma":[0.000019334384,0.00015203742,0.0011289032,0.013533301,0.00025373365,0.00076077244,0.00023902564,0.0075329114,0.0012877623,0.037404764,0.937589,0.000098341894],"about_ca_topic_score_codex":0.0024332774,"about_ca_topic_score_gemma":0.002743319,"teacher_disagreement_score":0.0030417542,"about_ca_system_score_codex":0.0009839555,"about_ca_system_score_gemma":0.0022752287,"threshold_uncertainty_score":0.010175645},"labels":[],"label_agreement":null},{"id":"W4233692268","doi":"10.2139/ssrn.3243665","title":"The Economics of Grid-Scale Electricity Storage: Location Heterogeneity and Business Models","year":2018,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Grid; Scale (ratio); Electricity; Business model; Business; Environmental economics; Economics; Geography; Engineering; Electrical engineering; Cartography; Marketing","score_opus":0.006353595307176042,"score_gpt":0.18853947392542564,"score_spread":0.18218587861824959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233692268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.746649,0.007416309,0.122964576,0.029840143,0.00021317527,0.00009826924,0.0024458794,0.0002824563,0.09009012],"genre_scores_gemma":[0.99329984,0.0012287911,0.0005807599,0.00012704072,0.00006447658,0.000010249842,0.00012359291,0.000012941233,0.0045522633],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916625,0.00042571014,0.000028357665,0.00013046392,0.000115526105,0.00013376033],"domain_scores_gemma":[0.99439186,0.0041653267,0.00073657656,0.00027492453,0.00019575552,0.00023560661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016396161,0.00037783652,0.0010329275,0.00088782614,0.0005307055,0.004960849,0.00125575,0.0020651056,0.0074587786],"category_scores_gemma":[0.0065895347,0.000611227,0.0007546264,0.002299712,0.0022711137,0.0075631835,0.0011469338,0.0016885223,0.00052607525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026566937,0.00014742598,0.010015181,0.00010840591,0.00012505367,0.0003279593,0.00009416143,0.3795496,0.0003712593,0.59210044,0.0052915066,0.011603284],"study_design_scores_gemma":[0.00010467421,0.00007883402,0.005971721,0.00005052387,0.00006831605,0.00016422258,0.0004492255,0.31244603,0.0002665758,0.6763551,0.0039996654,0.000045060973],"about_ca_topic_score_codex":0.006802927,"about_ca_topic_score_gemma":0.005584473,"teacher_disagreement_score":0.0074587786,"about_ca_system_score_codex":0.0031977633,"about_ca_system_score_gemma":0.0009090209,"threshold_uncertainty_score":0.024952114},"labels":[],"label_agreement":null},{"id":"W4234873233","doi":"10.32920/ryerson.14653368","title":"Power management of a grid-connected distributed energy resource system","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Energy storage; Grid; Renewable energy; Distributed generation; Wind power; Software; Graphical user interface; Intermittent energy source; MATLAB; Automotive engineering; Grid energy storage; Electric power system; Power (physics); Electrical engineering; Engineering; Operating system","score_opus":0.0054230046481540195,"score_gpt":0.17374855045713813,"score_spread":0.16832554580898412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234873233","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12980302,0.00025818913,0.84334606,0.00039148657,0.00010282834,0.00019136586,0.00032276844,0.004579378,0.021004876],"genre_scores_gemma":[0.9608452,0.00013815059,0.03321654,0.000044584005,0.00002755328,0.00009982502,0.00016159604,0.00010679777,0.005359733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997813,0.00006553937,0.000011649936,0.00006169655,0.00006589817,0.000013825409],"domain_scores_gemma":[0.99984884,0.000056583216,0.00001765619,0.000026827434,0.00003803523,0.000012050353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002801402,0.00038798104,0.00038217768,0.0002359425,0.000423107,0.0010387978,0.00054434553,0.00031613297,0.0027099007],"category_scores_gemma":[0.00050115754,0.00018020337,0.00016664945,0.00032827895,0.00025108815,0.00076808984,0.0004213521,0.00032178484,0.0004837474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000154073,0.00014679012,0.0016778352,0.00009891669,0.00004515087,0.00024500498,0.00010912759,0.8713607,0.013591444,0.010530838,0.0032103995,0.09882969],"study_design_scores_gemma":[0.000024845307,0.00003212877,0.00025813765,0.0000039386714,0.000009105703,0.000022278517,0.000011607883,0.9912606,0.002334337,0.0036925718,0.00234553,0.000004867559],"about_ca_topic_score_codex":0.0015703002,"about_ca_topic_score_gemma":0.0015519549,"teacher_disagreement_score":0.0027099007,"about_ca_system_score_codex":0.00046687922,"about_ca_system_score_gemma":0.00034106345,"threshold_uncertainty_score":0.009065509},"labels":[],"label_agreement":null},{"id":"W4235146912","doi":"10.1002/9781119453550.ch1","title":"Introduction","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; British Columbia Institute of Technology","funders":"","keywords":"Smart grid; Microgrid; Distributed generation; Renewable energy; Variety (cybernetics); Computer science; Electricity generation; Electricity; Grid; Electric power system; Distributed computing; Work (physics); Process (computing); Resource (disambiguation); Systems engineering; Power (physics); Engineering; Electrical engineering; Computer network","score_opus":0.0028764846230624874,"score_gpt":0.15626883708305717,"score_spread":0.1533923524599947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235146912","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00085677084,0.001905233,0.006615245,0.0048089125,0.0033332447,0.00016514778,0.0023282429,0.0009755839,0.9790116],"genre_scores_gemma":[0.0072605317,0.0023600298,0.004255147,0.0018643938,0.0007530662,0.00013275877,0.0028776764,0.0004080442,0.9800883],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99796754,0.00025818465,0.000106139705,0.00043004335,0.0010112647,0.00022686344],"domain_scores_gemma":[0.997726,0.00024774007,0.00012232369,0.00031745541,0.001173831,0.00041267637],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0015457416,0.0010784992,0.0005555681,0.001849864,0.0022090636,0.007928589,0.0021211202,0.002777031,0.46849677],"category_scores_gemma":[0.00430213,0.00029970863,0.00060075993,0.0023142146,0.0012728142,0.004695423,0.0037710795,0.0020433043,0.30772248],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005932488,0.00007014902,0.0005677954,0.00030477767,0.0000058361456,0.00018448294,0.0004134285,0.00031275317,0.0006829591,0.111115955,0.66349804,0.22278449],"study_design_scores_gemma":[0.0000015170017,0.0000064915275,0.00013593453,0.00006857848,0.0000011112813,0.00007883157,0.00007619203,0.000044615594,0.00010161684,0.003455645,0.9960258,0.0000036066483],"about_ca_topic_score_codex":0.0044409567,"about_ca_topic_score_gemma":0.0052823736,"teacher_disagreement_score":0.5315032,"about_ca_system_score_codex":0.0028752077,"about_ca_system_score_gemma":0.003503475,"threshold_uncertainty_score":0.7581248},"labels":[],"label_agreement":null},{"id":"W4235853182","doi":"10.26868/25222708.2019.210320","title":"A Co-simulation Framework for Assessing the Interaction between Heat Pumps and the Low Voltage Grid on a District Scale","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Ministerio de Economía y Competitividad; European Commission","keywords":"Grid; Scale (ratio); Computer science; Voltage; Environmental science; Mechanical engineering; Electrical engineering; Engineering; Physics; Geology","score_opus":0.03683016792284666,"score_gpt":0.30979432731807277,"score_spread":0.2729641593952261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235853182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012876633,0.000090882226,0.9637015,0.00019456165,0.000105659536,0.00023267778,0.0007948376,0.0055739153,0.016429283],"genre_scores_gemma":[0.44383317,0.00033208952,0.5381103,0.00016984312,0.00007550894,0.0015515112,0.0024305228,0.0024678316,0.011029239],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958414,0.00014897707,0.000022656304,0.000052599073,0.0001338811,0.00005766288],"domain_scores_gemma":[0.99930453,0.00025531522,0.00004682332,0.00013539413,0.00016446653,0.00009343063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010047719,0.0009204719,0.0008070905,0.00073919666,0.0010192503,0.0014359396,0.0022387444,0.0015432752,0.010101209],"category_scores_gemma":[0.0016947808,0.00045876816,0.0012112904,0.000624642,0.000781765,0.0011724962,0.0018307737,0.001729527,0.0012738768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039609236,0.000078102734,0.0010275084,0.00007915349,0.000045754114,0.00009374017,0.00011829273,0.9461498,0.0027720365,0.0380694,0.002663148,0.008863343],"study_design_scores_gemma":[0.000013434996,0.000019858475,0.0002146422,0.000010872253,0.000008185421,0.000025572528,0.000022188025,0.98571396,0.00084105006,0.0053492533,0.0077670333,0.00001393329],"about_ca_topic_score_codex":0.012227676,"about_ca_topic_score_gemma":0.009144723,"teacher_disagreement_score":0.012227676,"about_ca_system_score_codex":0.0009428122,"about_ca_system_score_gemma":0.0022305865,"threshold_uncertainty_score":0.0337919},"labels":[],"label_agreement":null},{"id":"W4238083102","doi":"10.32920/ryerson.14668311.v1","title":"Appliance scheduling optimization with micro-grid in smart home network","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Renewable energy; Photovoltaic system; Demand response; Computer science; Schedule; Electricity; Scheduling (production processes); Grid; Energy management; Engineering; Operations management; Electrical engineering; Energy (signal processing)","score_opus":0.007406659930030577,"score_gpt":0.18113812600874865,"score_spread":0.17373146607871806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238083102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13223523,0.0018439107,0.83592933,0.0008147148,0.00017733991,0.00015934638,0.0003599345,0.00059412734,0.02788598],"genre_scores_gemma":[0.9155222,0.00063692045,0.074481785,0.00010875349,0.00003774239,0.00018864285,0.0001945308,0.00007966401,0.008749652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979705,0.00008381937,0.0000060984103,0.00003702054,0.000035110766,0.000040938983],"domain_scores_gemma":[0.9997602,0.00014730135,0.00003695593,0.000007545148,0.00003067134,0.000017381593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003533921,0.00058682245,0.0007558625,0.00030090625,0.00031337497,0.00078171346,0.00043106388,0.000519678,0.0034951612],"category_scores_gemma":[0.00074329047,0.00034206346,0.0004159196,0.00059203524,0.00037657973,0.0004530499,0.0004931904,0.0006381594,0.0002426739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002604074,0.000011117997,0.00018950924,0.000025828778,0.000008200837,0.00003726779,0.000009889494,0.9933209,0.0002057025,0.0024850252,0.0003662331,0.003314217],"study_design_scores_gemma":[0.0000032931846,0.000008689577,0.000047565965,0.0000016530299,0.000001591724,0.0000038340086,0.0000060977864,0.9986419,0.000054961216,0.0010375578,0.00019192204,8.937529e-7],"about_ca_topic_score_codex":0.008225242,"about_ca_topic_score_gemma":0.006427451,"teacher_disagreement_score":0.008225242,"about_ca_system_score_codex":0.0008131043,"about_ca_system_score_gemma":0.00086440967,"threshold_uncertainty_score":0.01635474},"labels":[],"label_agreement":null},{"id":"W4240410148","doi":"10.32920/ryerson.14668311","title":"Appliance scheduling optimization with micro-grid in smart home network","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Renewable energy; Photovoltaic system; Demand response; Computer science; Schedule; Electricity; Scheduling (production processes); Energy management; Grid; Energy management system; Engineering; Electrical engineering; Operations management; Energy (signal processing)","score_opus":0.007406659930030577,"score_gpt":0.18113812600874865,"score_spread":0.17373146607871806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240410148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13223523,0.0018439107,0.83592933,0.0008147148,0.00017733991,0.00015934638,0.0003599345,0.00059412734,0.02788598],"genre_scores_gemma":[0.9155222,0.00063692045,0.074481785,0.00010875349,0.00003774239,0.00018864285,0.0001945308,0.00007966401,0.008749652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979705,0.00008381937,0.0000060984103,0.00003702054,0.000035110766,0.000040938983],"domain_scores_gemma":[0.9997602,0.00014730135,0.00003695593,0.000007545148,0.00003067134,0.000017381593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003533921,0.00058682245,0.0007558625,0.00030090625,0.00031337497,0.00078171346,0.00043106388,0.000519678,0.0034951612],"category_scores_gemma":[0.00074329047,0.00034206346,0.0004159196,0.00059203524,0.00037657973,0.0004530499,0.0004931904,0.0006381594,0.0002426739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002604074,0.000011117997,0.00018950924,0.000025828778,0.000008200837,0.00003726779,0.000009889494,0.9933209,0.0002057025,0.0024850252,0.0003662331,0.003314217],"study_design_scores_gemma":[0.0000032931846,0.000008689577,0.000047565965,0.0000016530299,0.000001591724,0.0000038340086,0.0000060977864,0.9986419,0.000054961216,0.0010375578,0.00019192204,8.937529e-7],"about_ca_topic_score_codex":0.008225242,"about_ca_topic_score_gemma":0.006427451,"teacher_disagreement_score":0.008225242,"about_ca_system_score_codex":0.0008131043,"about_ca_system_score_gemma":0.00086440967,"threshold_uncertainty_score":0.01635474},"labels":[],"label_agreement":null},{"id":"W4241063860","doi":"10.1016/j.procs.2015.05.113","title":"The 5th International Conference on Sustainable Energy Information Technology (SEIT) Preface","year":2015,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Computer science; Energy (signal processing); Sustainable energy; Data science; Electrical engineering; Renewable energy","score_opus":0.011642455183533499,"score_gpt":0.21471164386906166,"score_spread":0.20306918868552817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241063860","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008580886,0.02813899,0.029907806,0.02198246,0.30709422,0.00044182135,0.001784159,0.0014770335,0.6005927],"genre_scores_gemma":[0.025872933,0.013119292,0.0061964,0.0018514169,0.014520488,0.000118103526,0.0023881278,0.00044207743,0.93549126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994118,0.000059630256,0.000031179177,0.00008065005,0.00030350717,0.00011310085],"domain_scores_gemma":[0.99790215,0.00009607883,0.00004559126,0.00014177355,0.0012694162,0.00054505345],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0016332943,0.0007823712,0.0006947837,0.002221083,0.0012426222,0.0048286975,0.001060004,0.0017166743,0.1319547],"category_scores_gemma":[0.0014724587,0.00022328136,0.0006295495,0.0015351722,0.00060447573,0.0021785786,0.0019323997,0.0021111006,0.065606266],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115352865,0.00015447891,0.0008733442,0.0003189569,0.0000145809045,0.00020774845,0.0000855469,0.0005733343,0.0040037576,0.0110915685,0.72709984,0.25546145],"study_design_scores_gemma":[0.00000635517,0.000067137196,0.0009953579,0.00012364775,0.000009794416,0.00013568555,0.000102933445,0.00071435183,0.0012772708,0.0027148593,0.9938403,0.000012429891],"about_ca_topic_score_codex":0.0025151824,"about_ca_topic_score_gemma":0.0037270712,"teacher_disagreement_score":0.86804533,"about_ca_system_score_codex":0.0009643648,"about_ca_system_score_gemma":0.0025720163,"threshold_uncertainty_score":0.44143248},"labels":[],"label_agreement":null},{"id":"W4241891821","doi":"10.24124/2017/1375","title":"Gridsim: a flexible simulator for grid integration study","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Grid; Renewable energy; Smart grid; Systems engineering; Computer science; Software; Greenhouse gas; Mars Exploration Program; Wind power; Focus (optics); Simulation; Distributed computing; Engineering; Operating system; Electrical engineering","score_opus":0.01948089271608355,"score_gpt":0.28929729994309544,"score_spread":0.2698164072270119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241891821","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026429296,0.0006609416,0.8750975,0.0010506622,0.00059473765,0.00055900175,0.0084057795,0.045668732,0.0415334],"genre_scores_gemma":[0.39330745,0.0017479117,0.5468644,0.00053199177,0.00017050105,0.0022328133,0.017632889,0.013867988,0.023644011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964607,0.000105134204,0.00003583488,0.000032698747,0.00014260964,0.000037628848],"domain_scores_gemma":[0.99922824,0.00034663916,0.000045090306,0.000112753245,0.00019209848,0.00007508536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008094053,0.00086472975,0.00068072655,0.0005542799,0.00051187887,0.0009163988,0.0016342571,0.0008716737,0.012083548],"category_scores_gemma":[0.0025970628,0.0005534769,0.00085741444,0.00074298563,0.00039317526,0.0012880118,0.0013215559,0.0018820999,0.0024504939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017946614,0.00013368664,0.002431378,0.00040713124,0.00012652684,0.00025110654,0.00031465013,0.8365483,0.004954912,0.026095485,0.06783029,0.060727],"study_design_scores_gemma":[0.00010542506,0.000031974403,0.0002554711,0.000034776305,0.000024220351,0.000051915664,0.000033369906,0.9232059,0.0029687004,0.006693225,0.066570275,0.000024760882],"about_ca_topic_score_codex":0.0051913476,"about_ca_topic_score_gemma":0.005023747,"teacher_disagreement_score":0.012083548,"about_ca_system_score_codex":0.00046448657,"about_ca_system_score_gemma":0.0013287612,"threshold_uncertainty_score":0.040423512},"labels":[],"label_agreement":null},{"id":"W4242269186","doi":"10.32920/ryerson.14663079","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Environmental economics; Electricity; Grid; Electric power system; Electricity generation; Distributed generation; Environmental science; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.02209325686729482,"score_gpt":0.23459497470373933,"score_spread":0.2125017178364445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242269186","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035917412,0.0008096278,0.9281214,0.00078505435,0.000093145696,0.0003690477,0.0017287732,0.00053468393,0.031640902],"genre_scores_gemma":[0.69568795,0.00092256087,0.291772,0.00011944917,0.000044876902,0.00078171,0.0019001118,0.0001401408,0.008631203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994679,0.00018519768,0.000022161,0.00009207528,0.00013143219,0.00010128842],"domain_scores_gemma":[0.9994479,0.00026972196,0.00005643353,0.000016699165,0.00016061032,0.000048559283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011716338,0.0012079473,0.0008502023,0.0009991808,0.0006177238,0.0018841585,0.0014755299,0.00096328807,0.006561687],"category_scores_gemma":[0.0014595337,0.0008808765,0.0015374046,0.0012049025,0.0005303538,0.00085241726,0.0012800992,0.0011207333,0.00038381192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000815468,0.000008858679,0.00021814495,0.000024523362,0.000013846889,0.00005290216,0.00002823801,0.9903769,0.000092449984,0.00589969,0.00031254705,0.0029638032],"study_design_scores_gemma":[0.000006267542,0.000010004239,0.00006145962,0.000008123164,0.000008130534,0.0000065022878,0.000033771517,0.99572253,0.00005484101,0.003131765,0.0009534466,0.0000031119898],"about_ca_topic_score_codex":0.06735502,"about_ca_topic_score_gemma":0.07511796,"teacher_disagreement_score":0.06735502,"about_ca_system_score_codex":0.0025372356,"about_ca_system_score_gemma":0.004357199,"threshold_uncertainty_score":0.13392597},"labels":[],"label_agreement":null},{"id":"W4242864714","doi":"10.32920/ryerson.14649462","title":"Residential energy management systems with renewables and battery energy storage","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"Mitacs","keywords":"Renewable energy; Energy management; Demand response; Computer science; Variety (cybernetics); Controller (irrigation); Model predictive control; Environmental economics; Energy consumption; Energy storage; Transactive memory; Control (management); Risk analysis (engineering); Industrial engineering; Operations research; Electricity; Energy (signal processing); Engineering; Business; Economics; Artificial intelligence; Knowledge management","score_opus":0.005733752006449119,"score_gpt":0.16494873826689338,"score_spread":0.15921498626044425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242864714","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6304179,0.0007785693,0.30450204,0.0005738352,0.00010021172,0.00019405958,0.0003424088,0.001535192,0.061555848],"genre_scores_gemma":[0.9838928,0.00017558192,0.010074921,0.0000190573,0.000010235036,0.000040743562,0.00007083253,0.0000143902,0.0057014334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972564,0.000096313524,0.000014627066,0.00004999597,0.00008253389,0.00003075648],"domain_scores_gemma":[0.9998369,0.000049606224,0.000020951222,0.000037856767,0.00004659998,0.000008028609],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021130854,0.00028771823,0.00040581918,0.00016106869,0.00038412726,0.0008215435,0.0006788194,0.00038682195,0.0033398105],"category_scores_gemma":[0.00046478378,0.00022933805,0.0004964231,0.00045853556,0.00029599774,0.0009753569,0.0005815507,0.0003567383,0.0006261644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023803592,0.00022966429,0.0027535716,0.00013172785,0.0000701666,0.00019919963,0.00011091169,0.9241374,0.0063062413,0.0132980235,0.0010864424,0.05143865],"study_design_scores_gemma":[0.000031060605,0.00015532777,0.00089559023,0.000010463154,0.000025351435,0.00005699609,0.000054042175,0.9882826,0.0031332728,0.0037656368,0.0035787963,0.00001085051],"about_ca_topic_score_codex":0.0048259874,"about_ca_topic_score_gemma":0.0056920704,"teacher_disagreement_score":0.0048259874,"about_ca_system_score_codex":0.00054521195,"about_ca_system_score_gemma":0.00053180056,"threshold_uncertainty_score":0.011172712},"labels":[],"label_agreement":null},{"id":"W4243484317","doi":"10.26868/25222708.2019.210568","title":"Linear Discriminant Analysis for Classification of a Large Virtual Smart Meter Data Set With Known Building Parameters","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Institut de Valorisation des Données","keywords":"Linear discriminant analysis; Discriminant; Data set; Computer science; Set (abstract data type); Optimal discriminant analysis; Smart meter; Metre; Pattern recognition (psychology); Artificial intelligence; Data mining; Engineering; Smart grid","score_opus":0.10546978171914595,"score_gpt":0.3129414925858361,"score_spread":0.20747171086669014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243484317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37438855,0.00034687718,0.6176789,0.00036361205,0.00016185646,0.0002339788,0.0013228689,0.003164111,0.0023392728],"genre_scores_gemma":[0.7885417,0.00012026666,0.20719254,0.00004748143,0.000044402736,0.0003215044,0.002022719,0.00010397934,0.0016054397],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987503,0.0005061113,0.000099337834,0.0002027667,0.0003366326,0.00010485964],"domain_scores_gemma":[0.9978471,0.0012063889,0.0001243374,0.00028734328,0.00047915106,0.000055693097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002536666,0.0007956928,0.0006551763,0.0019000833,0.0005055305,0.00063249515,0.00050349755,0.0004786651,0.001312635],"category_scores_gemma":[0.0062968084,0.00020642031,0.0007724752,0.0016351218,0.00030678103,0.00060788874,0.00058819045,0.00079468155,0.0011060396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011607978,0.0008544824,0.025812345,0.00023057264,0.00022676535,0.00027183673,0.0004666953,0.24217008,0.03248007,0.003257255,0.0075582545,0.6855109],"study_design_scores_gemma":[0.0000152932,0.000103821825,0.0078670755,0.000008895408,0.000012306305,0.000049117127,0.000101111815,0.9853795,0.0046225195,0.0009546308,0.0008638599,0.000021758335],"about_ca_topic_score_codex":0.0044929,"about_ca_topic_score_gemma":0.0028594502,"teacher_disagreement_score":0.0044929,"about_ca_system_score_codex":0.00056592154,"about_ca_system_score_gemma":0.0006489921,"threshold_uncertainty_score":0.013415337},"labels":[],"label_agreement":null},{"id":"W4244444641","doi":"10.32920/ryerson.14645877","title":"Demand side management in smart grid","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Demand response; HVAC; Grid; Peak demand; Demand side; Load shifting; Computer science; Load management; Electricity; Consumption (sociology); Reduction (mathematics); Demand management; Consumer demand; Environmental economics; Microeconomics; Economics; Air conditioning; Electrical engineering; Engineering; Mathematics","score_opus":0.010109723238308369,"score_gpt":0.20348612704084962,"score_spread":0.19337640380254126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244444641","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12452765,0.0029245485,0.82312655,0.0018421155,0.0004682371,0.00014903201,0.0003815212,0.0024239507,0.044156436],"genre_scores_gemma":[0.959341,0.0007272105,0.028832229,0.00018873515,0.00011824155,0.000042092026,0.00017288089,0.000095522344,0.010482067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998216,0.000052213993,0.000009088388,0.00003765394,0.000053381198,0.000026128702],"domain_scores_gemma":[0.9998759,0.00003957322,0.000015165473,0.000020150319,0.000038410148,0.00001085406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021367618,0.00030625972,0.00033268103,0.00013548667,0.000291467,0.0007731557,0.00034098348,0.000397772,0.0038218067],"category_scores_gemma":[0.00024436976,0.00014496836,0.00023198174,0.00029994873,0.00020415915,0.0008719192,0.00041125822,0.0004314281,0.0007809924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055392756,0.0002780718,0.002847767,0.0005585479,0.00007804724,0.00078765396,0.00023737719,0.54336005,0.049776163,0.0639378,0.026201418,0.31138325],"study_design_scores_gemma":[0.000027150298,0.00010396028,0.00060758536,0.000016700433,0.000017112427,0.00016568552,0.00008315633,0.9511526,0.0096087735,0.01980082,0.01840091,0.000015543255],"about_ca_topic_score_codex":0.001226118,"about_ca_topic_score_gemma":0.0012460111,"teacher_disagreement_score":0.0038218067,"about_ca_system_score_codex":0.00037277894,"about_ca_system_score_gemma":0.00028488954,"threshold_uncertainty_score":0.012785256},"labels":[],"label_agreement":null},{"id":"W4245808815","doi":"10.1016/s1464-2859(19)30237-8","title":"HPS, Ballard link for energy self-sufficient homes, crowd-funding","year":2019,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Independence (probability theory); Power (physics); Engineering; Stack (abstract data type); German; Energy (signal processing); Telecommunications; Business; Computer science; Geography; Physics; Operating system; Mathematics","score_opus":0.00476077812719072,"score_gpt":0.16990353285722898,"score_spread":0.16514275473003825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245808815","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050199,0.0047568064,0.0054069413,0.046107166,0.007515415,0.00025692192,0.0044801296,0.0043665376,0.92209023],"genre_scores_gemma":[0.011065039,0.0010882558,0.0021523333,0.0016222426,0.0003647391,0.000041856703,0.0015384952,0.0005374554,0.9815895],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986051,0.00011460488,0.000031459916,0.00020644446,0.00085690775,0.0001856499],"domain_scores_gemma":[0.9973174,0.00018073726,0.000057128294,0.00013708392,0.0011586024,0.0011489954],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013646251,0.0006699893,0.00030403186,0.0006919984,0.0023081691,0.0026669533,0.00060056726,0.0019850754,0.40263593],"category_scores_gemma":[0.0025835778,0.00037328925,0.00026350876,0.0006209568,0.00054536184,0.0018754989,0.0019346201,0.0020198326,0.12964767],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036805315,0.000020371586,0.00011818994,0.000043038104,0.0000015691287,0.000086054,0.00006258813,0.000041411568,0.0003329854,0.0070441975,0.95251304,0.03969978],"study_design_scores_gemma":[0.000007241065,0.0000132147625,0.00021981337,0.000017451175,0.0000010996031,0.00006688009,0.00006009535,0.000060414503,0.00019401571,0.0006098897,0.9987465,0.0000033013885],"about_ca_topic_score_codex":0.017526833,"about_ca_topic_score_gemma":0.02576843,"teacher_disagreement_score":0.40263593,"about_ca_system_score_codex":0.0015952049,"about_ca_system_score_gemma":0.0061892085,"threshold_uncertainty_score":0.85206735},"labels":[],"label_agreement":null},{"id":"W4246711449","doi":"10.32920/ryerson.14665155","title":"A multi-level optimization technique for electricity consumption management and pricing in residential neighborhoods","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Energy management; Smart grid; Demand response; Revenue; Energy consumption; Electricity; Environmental economics; Operations research; Business; Energy (signal processing); Engineering; Economics","score_opus":0.02948659525984441,"score_gpt":0.2543964155637073,"score_spread":0.2249098203038629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246711449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003333562,0.00006735495,0.99420196,0.000094829586,0.000017426024,0.000023831026,0.000016188498,0.00007982878,0.0021649587],"genre_scores_gemma":[0.40319455,0.00030100867,0.5888378,0.00016380625,0.0000717593,0.00028269034,0.00009365453,0.00015681057,0.0068979454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994611,0.00026508738,0.000017648128,0.00007773357,0.00013019376,0.000048241065],"domain_scores_gemma":[0.9996902,0.0001662034,0.00003781477,0.000025180509,0.00006100728,0.00001971217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00118641,0.0007020697,0.00075714,0.00044149382,0.0004986138,0.0010345028,0.00089220534,0.00066892285,0.0031136924],"category_scores_gemma":[0.0018998402,0.00050381914,0.0009514521,0.00068896683,0.0004924754,0.0010295425,0.0010250713,0.0012873331,0.00049791636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029537778,0.000040401243,0.0003465168,0.00005014402,0.000029721048,0.00004154588,0.00005469865,0.93096507,0.001497096,0.04049133,0.00121611,0.025237815],"study_design_scores_gemma":[0.0000017501349,0.000009115904,0.000028323486,0.0000018944849,0.0000020946572,0.0000033972547,0.0000037026618,0.9968957,0.00009386873,0.0026270298,0.00033176303,0.0000014004044],"about_ca_topic_score_codex":0.004180421,"about_ca_topic_score_gemma":0.004549231,"teacher_disagreement_score":0.004180421,"about_ca_system_score_codex":0.0008973518,"about_ca_system_score_gemma":0.0010307123,"threshold_uncertainty_score":0.010416329},"labels":[],"label_agreement":null},{"id":"W4246924798","doi":"10.5383/swes.8.01.006","title":"Smart Home System for Energy Saving using Genetic- Fuzzy-Neural Networks Approach","year":2016,"lang":"en","type":"article","venue":"International Journal of Sustainable Water and Environmental Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Home automation; Computer science; Artificial neural network; Fuzzy logic; Genetic algorithm; Fuzzy control system; Energy (signal processing); Smart grid; Control (management); Artificial intelligence; Engineering; Machine learning; Telecommunications","score_opus":0.0055990153596761965,"score_gpt":0.16722739993316885,"score_spread":0.16162838457349266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246924798","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09317895,0.00074769196,0.88334936,0.00037494145,0.00016125622,0.00017217673,0.00011824634,0.0021599026,0.019737495],"genre_scores_gemma":[0.8889006,0.0003843413,0.101451986,0.00012332195,0.000027909764,0.00016583296,0.00012558814,0.000026954118,0.0087935375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99991834,0.000012769325,0.000004432176,0.000020316622,0.000031710835,0.000012443096],"domain_scores_gemma":[0.9999614,0.000011370527,0.0000049692826,0.00000301387,0.000016768787,0.0000024744297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001436574,0.0002920946,0.00032140102,0.00021516246,0.00034136433,0.00041079195,0.0004019057,0.00045202707,0.0022132548],"category_scores_gemma":[0.00020415272,0.0000900595,0.00027957026,0.00022528206,0.00014314489,0.00040573522,0.00022213704,0.0002844569,0.0002703621],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027487692,0.00032974285,0.003090703,0.00031414634,0.00013358438,0.00040339265,0.00027365494,0.49468163,0.056371417,0.014124511,0.0062225685,0.42377973],"study_design_scores_gemma":[0.000037869406,0.00010088486,0.00075646554,0.000019479412,0.0000428022,0.00008158414,0.00003674158,0.9825951,0.0097671375,0.0028259046,0.0037196279,0.000016385016],"about_ca_topic_score_codex":0.0052063414,"about_ca_topic_score_gemma":0.0071109035,"teacher_disagreement_score":0.0052063414,"about_ca_system_score_codex":0.0003675547,"about_ca_system_score_gemma":0.00038560806,"threshold_uncertainty_score":0.010352075},"labels":[],"label_agreement":null},{"id":"W4247344955","doi":"10.22215/etd/2012-09486","title":"Stochastic optimization in green wireless netowrks and smart grids","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"University of Connecticut","keywords":"Computer science; Wireless; Telecommunications","score_opus":0.006150016979635056,"score_gpt":0.19593071730532405,"score_spread":0.189780700325689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247344955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07870102,0.0050657177,0.8693542,0.0069891443,0.00066121295,0.0000729772,0.00032432098,0.00017240136,0.038659103],"genre_scores_gemma":[0.905615,0.0049606757,0.04562481,0.00050621206,0.00055769156,0.0001403164,0.00021258186,0.0001234138,0.042259257],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943465,0.00027416056,0.000020513527,0.000067861314,0.00011373565,0.00008898178],"domain_scores_gemma":[0.99850047,0.0010715395,0.00015336735,0.00003868404,0.00013215345,0.00010393558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012475319,0.00055962027,0.0008140781,0.0004503014,0.00034309714,0.0013400313,0.000580835,0.0007108248,0.0036936898],"category_scores_gemma":[0.0031941435,0.00033892403,0.0005590882,0.00068090664,0.0011471786,0.0010333547,0.0008312886,0.0010285557,0.00021735305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042835945,0.00002960737,0.00043496015,0.00006432786,0.000048890706,0.000040715924,0.000031912612,0.7831842,0.00031249106,0.20140195,0.0036453742,0.010762873],"study_design_scores_gemma":[0.000011356623,0.0000168784,0.00019521927,0.000013325035,0.0000051870793,0.0000060467887,0.000020081881,0.92687297,0.00008009552,0.07113036,0.0016421913,0.0000062176073],"about_ca_topic_score_codex":0.0073461323,"about_ca_topic_score_gemma":0.00870835,"teacher_disagreement_score":0.0073461323,"about_ca_system_score_codex":0.0017228394,"about_ca_system_score_gemma":0.0012694679,"threshold_uncertainty_score":0.014606714},"labels":[],"label_agreement":null},{"id":"W4247811216","doi":"10.22215/etd/2018-13368","title":"Economic Optimization of Campus Energy System Using Real Time Pricing","year":2018,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Greenhouse gas; Grid; Battery (electricity); Energy storage; Capacity optimization; Automotive engineering; Thermal energy storage; Electric potential energy; Grid energy storage; Energy (signal processing); Generator (circuit theory); Computer science; Electrical engineering; Process engineering; Environmental economics; Engineering; Distributed generation; Renewable energy; Power (physics); Economics","score_opus":0.004138519465690159,"score_gpt":0.18925399066010218,"score_spread":0.18511547119441202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247811216","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25571918,0.0011593243,0.6336489,0.0018178327,0.00015611807,0.00031112783,0.00028709057,0.00028743193,0.10661307],"genre_scores_gemma":[0.9668354,0.0004191558,0.02486543,0.000034060893,0.000021676455,0.00010055067,0.00005698961,0.000047237307,0.0076194014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994373,0.0002817554,0.000012731331,0.00007052758,0.000120393575,0.00007718825],"domain_scores_gemma":[0.9995322,0.0002800785,0.000051019855,0.000029654282,0.00007029462,0.00003677469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094373163,0.00062977447,0.0005868599,0.00036173384,0.00035211368,0.00205935,0.000709229,0.0007500155,0.004518548],"category_scores_gemma":[0.0024615664,0.0003301395,0.0004742124,0.0005649484,0.00044203174,0.0014206113,0.00083355315,0.0010630703,0.00032408003],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024572375,0.00003203928,0.00020934199,0.000029880473,0.000014196331,0.000032599022,0.00001528148,0.97150064,0.00043188958,0.019510249,0.00042540932,0.0077739093],"study_design_scores_gemma":[0.000005664381,0.00003092929,0.00014654108,0.0000052493383,0.0000058305154,0.000008021204,0.000028399963,0.9926394,0.0002229816,0.006161468,0.0007415045,0.00000393903],"about_ca_topic_score_codex":0.003508943,"about_ca_topic_score_gemma":0.0029806742,"teacher_disagreement_score":0.004518548,"about_ca_system_score_codex":0.001618049,"about_ca_system_score_gemma":0.0014979544,"threshold_uncertainty_score":0.015116036},"labels":[],"label_agreement":null},{"id":"W4248141281","doi":"10.22215/etd/2016-11327","title":"Increasing the Capacity of Photovoltaics Using Proton Exchange Membrane Fuel Cell Backup within a Residential Community","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Backup; Photovoltaic system; Proton exchange membrane fuel cell; Environmental economics; Photovoltaics; Renewable energy; Building-integrated photovoltaics; Tariff; Grid; Electricity generation; Business; Net metering; Engineering; Environmental science; Distributed generation; Fuel cells; Electrical engineering; Power (physics)","score_opus":0.026055890837895026,"score_gpt":0.23104983208052707,"score_spread":0.20499394124263204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248141281","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80550903,0.0011568229,0.0046078195,0.0019113694,0.00004808895,0.00005371488,0.00013491395,0.00014307599,0.1864351],"genre_scores_gemma":[0.98437774,0.0007858414,0.0022043954,0.00003433953,0.00001002405,0.0000074717955,0.000035016346,0.000011969652,0.012533285],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986017,0.000019854488,0.000002428697,0.000020783606,0.00006280123,0.000033933953],"domain_scores_gemma":[0.9997832,0.000039900064,0.00001235265,0.000017573322,0.00010918483,0.000037783822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002057318,0.00010363282,0.000092471644,0.0003083663,0.0005759301,0.00071125745,0.00036938954,0.00027945836,0.006724588],"category_scores_gemma":[0.000619792,0.00007191819,0.00016550042,0.00041814742,0.00017714263,0.0006481774,0.00040806763,0.00019188906,0.0009169578],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003921093,0.0009773342,0.023553543,0.00039404994,0.00003933649,0.0008217078,0.0045842617,0.017910449,0.11979153,0.020048449,0.018184025,0.7933032],"study_design_scores_gemma":[0.00024124005,0.0026121035,0.13963252,0.0010177398,0.00029284248,0.0023957656,0.034874346,0.11508646,0.27717626,0.024543036,0.40193933,0.00018839708],"about_ca_topic_score_codex":0.011964863,"about_ca_topic_score_gemma":0.027598327,"teacher_disagreement_score":0.011964863,"about_ca_system_score_codex":0.0008702708,"about_ca_system_score_gemma":0.0012332962,"threshold_uncertainty_score":0.02379042},"labels":[],"label_agreement":null},{"id":"W4248338111","doi":"10.32920/ryerson.14656659","title":"Demand Side Simulation: Architecture and Performance","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Relational database management system; Context (archaeology); Smart grid; Demand response; Energy consumption; Efficient energy use; Simulation; Grid; Architecture; Distributed computing; Electricity; Database; Engineering; Relational database","score_opus":0.009062923102969305,"score_gpt":0.20045447281801188,"score_spread":0.19139154971504257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248338111","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10815132,0.00055514154,0.8397219,0.00087523717,0.00013518156,0.00034417328,0.0007255154,0.024517126,0.024974369],"genre_scores_gemma":[0.80052465,0.0006683025,0.18706012,0.00017493317,0.00006698201,0.00026555997,0.0020478785,0.0016092357,0.00758242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902976,0.0003174903,0.00007109397,0.00015157532,0.00034067084,0.0000893684],"domain_scores_gemma":[0.99809796,0.0006277203,0.000071988936,0.0006344661,0.00041848555,0.00014937282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012856328,0.0008329898,0.0006357024,0.0005011115,0.00049679825,0.0023728001,0.00196208,0.0009844102,0.006027763],"category_scores_gemma":[0.0037862293,0.00060123135,0.0004952944,0.00065725576,0.0004901042,0.0022426653,0.0017077294,0.0010175626,0.0020093895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013185393,0.0006385605,0.013104361,0.00032764478,0.00019928598,0.00022333644,0.00047176934,0.7530748,0.028540563,0.050114,0.011194113,0.14079301],"study_design_scores_gemma":[0.000023808885,0.000032695156,0.0002223063,0.000005530009,0.000010018988,0.000031582946,0.000018234929,0.98948693,0.0041494244,0.0032201794,0.0027902331,0.000008997611],"about_ca_topic_score_codex":0.0060652755,"about_ca_topic_score_gemma":0.0029807591,"teacher_disagreement_score":0.0060652755,"about_ca_system_score_codex":0.00096100086,"about_ca_system_score_gemma":0.0011882909,"threshold_uncertainty_score":0.020164847},"labels":[],"label_agreement":null},{"id":"W4248917212","doi":"10.5383/ijtee.14.01.007","title":"Techno-Economic Study of PV System for Household Electricity Generation in Almadinah AlMunawwarah","year":2017,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Taibah University","keywords":"Photovoltaic system; Air conditioning; Electricity; Refrigeration; Cooling load; Coefficient of performance; Environmental science; Automotive engineering; Inverter; Architectural engineering; Engineering; Electrical engineering; Heat pump; Mechanical engineering; Voltage","score_opus":0.010486975975015234,"score_gpt":0.18693887486210264,"score_spread":0.1764518988870874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248917212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99026906,0.00033616248,0.0014886459,0.00008188255,0.00001412247,0.000049308623,0.00018752526,0.000014696786,0.007558587],"genre_scores_gemma":[0.99829036,0.00012189269,0.0003373314,0.000004737421,0.0000038662383,0.000010392555,0.000079296675,0.000003080365,0.0011491356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997799,0.000060416718,0.0000071028953,0.00002480786,0.00008616322,0.00004158225],"domain_scores_gemma":[0.99976975,0.00011150895,0.000020639558,0.0000094257075,0.00007028256,0.000018363226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031367954,0.00024581203,0.00018877997,0.00048298502,0.00034664597,0.00091851037,0.00033121262,0.00033757897,0.0025973974],"category_scores_gemma":[0.0004237716,0.00015072571,0.00032790488,0.0006223669,0.00014737499,0.00046757088,0.00026323105,0.00032103717,0.00019529687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013645736,0.00097468775,0.15265101,0.0010041225,0.00028341045,0.005465329,0.0006235672,0.6492815,0.07153359,0.008348757,0.0038530498,0.10461643],"study_design_scores_gemma":[0.00010841645,0.001706774,0.24719663,0.0000652438,0.00021117614,0.0006754698,0.0030251676,0.70841825,0.02711282,0.0016547238,0.009768719,0.000056652316],"about_ca_topic_score_codex":0.009886326,"about_ca_topic_score_gemma":0.015252724,"teacher_disagreement_score":0.009886326,"about_ca_system_score_codex":0.0011849897,"about_ca_system_score_gemma":0.00034977158,"threshold_uncertainty_score":0.019657552},"labels":[],"label_agreement":null},{"id":"W4248984144","doi":"10.22215/etd/2012-06947","title":"Usage monitoring of electrical devices in a smart home","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transient (computer programming); Waveform; Electrical load; Electrical equipment; Electric power; Electrical network; Computer science; Power (physics); Electric power system; Transient state; Electrical engineering; Power consumption; Engineering; Electronic engineering; Real-time computing; Voltage","score_opus":0.009967869129221653,"score_gpt":0.22969342323832861,"score_spread":0.21972555410910696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248984144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9726555,0.0004723448,0.013101458,0.00020664174,0.00003840136,0.000046263223,0.00043331506,0.00036814975,0.012677938],"genre_scores_gemma":[0.98737866,0.0003277208,0.004130329,0.00003720942,0.0000189698,0.000020218838,0.00020922266,0.00002493885,0.007852738],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99982893,0.000037427842,0.000011865307,0.000038421313,0.00006623204,0.000017002787],"domain_scores_gemma":[0.9998536,0.000042734802,0.000027413313,0.000016325364,0.00004404743,0.000015796853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013905343,0.0001526517,0.00018646652,0.0004839503,0.00013885839,0.00036568916,0.00014885196,0.00022597454,0.0018670096],"category_scores_gemma":[0.00042724313,0.00008512007,0.000109097506,0.0003679112,0.000077698125,0.00040119124,0.0001926552,0.00015972403,0.00053735374],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013298591,0.00089239783,0.1722486,0.00034015585,0.00011806503,0.0011992995,0.0019847655,0.014547333,0.21192409,0.0014123811,0.008678514,0.5853245],"study_design_scores_gemma":[0.000054722903,0.0013681224,0.66301554,0.0001869601,0.00016227689,0.0016521459,0.002816456,0.16648163,0.13532732,0.0020628283,0.026806774,0.00006519139],"about_ca_topic_score_codex":0.00079746253,"about_ca_topic_score_gemma":0.0014152534,"teacher_disagreement_score":0.0018670096,"about_ca_system_score_codex":0.00013493768,"about_ca_system_score_gemma":0.00009864337,"threshold_uncertainty_score":0.0062457323},"labels":[],"label_agreement":null},{"id":"W4249387859","doi":"10.32920/ryerson.14643837","title":"Conceptual Framework for Enhancing Energy Disaggregation Using Crowd and Context","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Workflow; Computer science; Context (archaeology); Automation; Energy consumption; Data science; Crowdsourcing; Energy (signal processing); Audit; Data mining; Artificial intelligence; Database; World Wide Web; Engineering; Business","score_opus":0.023895260357764937,"score_gpt":0.24440239238746814,"score_spread":0.2205071320297032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249387859","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005867995,0.00053883396,0.9656705,0.0030123834,0.00016572185,0.00032332414,0.00038612523,0.0006149321,0.02342025],"genre_scores_gemma":[0.23413123,0.00094999454,0.7554681,0.0006374933,0.00017486732,0.00071945257,0.00078451086,0.00022431128,0.006910082],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99676716,0.0013390108,0.00021349684,0.00078859675,0.0006399505,0.00025170043],"domain_scores_gemma":[0.9961397,0.0014921139,0.00033782338,0.00091118674,0.0006758913,0.00044328318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059251543,0.001209989,0.0007310775,0.0032583787,0.0023459196,0.006385068,0.0029751996,0.0023040476,0.005348768],"category_scores_gemma":[0.008495865,0.00079581415,0.0018405172,0.0024899265,0.0045603067,0.009233013,0.009122727,0.0022279073,0.0011800196],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046103483,0.00008880147,0.0016620666,0.00023641468,0.00006103655,0.0003127598,0.0022209145,0.02905641,0.001717589,0.92952377,0.0032971685,0.031776976],"study_design_scores_gemma":[0.000040793664,0.000068949594,0.00095340685,0.0003447263,0.0000820914,0.00029704653,0.002402594,0.14919017,0.0025237834,0.70798546,0.13601471,0.00009623999],"about_ca_topic_score_codex":0.011266142,"about_ca_topic_score_gemma":0.009615195,"teacher_disagreement_score":0.011266142,"about_ca_system_score_codex":0.0021256143,"about_ca_system_score_gemma":0.0036651797,"threshold_uncertainty_score":0.031335533},"labels":[],"label_agreement":null},{"id":"W4250369619","doi":"10.1109/sasg.2017.8356562","title":"IEEE copyright and consent form","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Residence; Energy storage; Electricity; Environmental economics; Residence time (fluid dynamics); Energy (signal processing); Battery (electricity); Computer science; Business; Telecommunications; Electrical engineering; Economics; Engineering; Power (physics)","score_opus":0.019432152403642617,"score_gpt":0.2250554170827368,"score_spread":0.20562326467909417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250369619","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00095600577,0.00070910424,0.0055742054,0.007006154,0.0062069134,0.0015843145,0.014050746,0.0016937068,0.9622189],"genre_scores_gemma":[0.0077319923,0.0010868603,0.002478254,0.0060502095,0.0010081258,0.0015217006,0.009373867,0.0009092618,0.9698397],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99737763,0.000607372,0.00035423823,0.0004914171,0.00080403767,0.00036542336],"domain_scores_gemma":[0.98961216,0.0025624263,0.0003128465,0.003438428,0.0034141417,0.0006598505],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0037527496,0.0008899244,0.0010717185,0.0013923807,0.001986492,0.005652772,0.0017292852,0.0043656765,0.78368735],"category_scores_gemma":[0.019482214,0.00051080855,0.00071421446,0.0018866011,0.0015926197,0.0033389549,0.0025507123,0.0041801054,0.6638863],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114107745,0.000063161766,0.0002167161,0.00033940846,0.000008142024,0.0002480091,0.00018449307,0.00008241933,0.00076450635,0.013988595,0.91499835,0.068992116],"study_design_scores_gemma":[0.00001823529,0.000016996595,0.00024041784,0.000166548,0.0000031151894,0.00017166426,0.00008629657,0.000087935274,0.00012578741,0.0024997795,0.9965743,0.000008926908],"about_ca_topic_score_codex":0.0026664268,"about_ca_topic_score_gemma":0.0047163093,"teacher_disagreement_score":0.78368735,"about_ca_system_score_codex":0.001166304,"about_ca_system_score_gemma":0.0034701824,"threshold_uncertainty_score":0.30854368},"labels":[],"label_agreement":null},{"id":"W4250682756","doi":"10.22215/etd/2020-14213","title":"Using Machine Learning and Deep Learning for Load disaggregation and Recognition of Activities in Household","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Benchmark (surveying); Computer science; Artificial intelligence; Machine learning; Consumption (sociology); Energy (signal processing); Random forest; Ensemble learning; Demand response; Electricity; Energy consumption; Term (time); Demand forecasting; Operations research; Engineering; Statistics; Geography; Mathematics","score_opus":0.025759366528386018,"score_gpt":0.23484912242613784,"score_spread":0.20908975589775183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250682756","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28714228,0.0024530166,0.6913931,0.0014271769,0.00021768127,0.000064739725,0.001062521,0.0012695711,0.014969986],"genre_scores_gemma":[0.85471195,0.0018232155,0.13357794,0.00013686014,0.00011180889,0.00006366986,0.0011724498,0.00005351007,0.008348647],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998709,0.000024719991,0.0000066227826,0.000043870652,0.00003153854,0.000022287737],"domain_scores_gemma":[0.99980456,0.00009358745,0.000020776326,0.000028471712,0.000043123182,0.000009510182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030096708,0.00043605227,0.00026345474,0.00036415012,0.00016245223,0.00059418083,0.0002371023,0.00033365615,0.001172058],"category_scores_gemma":[0.001025205,0.00018351666,0.00037633517,0.0006443531,0.00013560934,0.0007645641,0.0004022668,0.00093805173,0.000508871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007662239,0.00022903862,0.009021224,0.000080550075,0.000092734146,0.000053151016,0.00017091722,0.25161558,0.0089982785,0.005845085,0.004011768,0.71980506],"study_design_scores_gemma":[0.0000025962736,0.000026878453,0.0034622594,0.000014423584,0.000012860412,0.000011686446,0.00003023069,0.98646414,0.003620636,0.004797414,0.0015499888,0.000006879017],"about_ca_topic_score_codex":0.005803242,"about_ca_topic_score_gemma":0.010335057,"teacher_disagreement_score":0.005803242,"about_ca_system_score_codex":0.00045333218,"about_ca_system_score_gemma":0.00045481097,"threshold_uncertainty_score":0.011538923},"labels":[],"label_agreement":null},{"id":"W4251344196","doi":"10.32920/ryerson.14656659.v1","title":"Demand Side Simulation: Architecture and Performance","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Relational database management system; Context (archaeology); Smart grid; Demand response; Energy consumption; Efficient energy use; Simulation; Grid; On demand; Architecture; Embedded system; Electricity; Database; Engineering; Relational database","score_opus":0.009062923102969305,"score_gpt":0.20045447281801188,"score_spread":0.19139154971504257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251344196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10815132,0.00055514154,0.8397219,0.00087523717,0.00013518156,0.00034417328,0.0007255154,0.024517126,0.024974369],"genre_scores_gemma":[0.80052465,0.0006683025,0.18706012,0.00017493317,0.00006698201,0.00026555997,0.0020478785,0.0016092357,0.00758242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902976,0.0003174903,0.00007109397,0.00015157532,0.00034067084,0.0000893684],"domain_scores_gemma":[0.99809796,0.0006277203,0.000071988936,0.0006344661,0.00041848555,0.00014937282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012856328,0.0008329898,0.0006357024,0.0005011115,0.00049679825,0.0023728001,0.00196208,0.0009844102,0.006027763],"category_scores_gemma":[0.0037862293,0.00060123135,0.0004952944,0.00065725576,0.0004901042,0.0022426653,0.0017077294,0.0010175626,0.0020093895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013185393,0.0006385605,0.013104361,0.00032764478,0.00019928598,0.00022333644,0.00047176934,0.7530748,0.028540563,0.050114,0.011194113,0.14079301],"study_design_scores_gemma":[0.000023808885,0.000032695156,0.0002223063,0.000005530009,0.000010018988,0.000031582946,0.000018234929,0.98948693,0.0041494244,0.0032201794,0.0027902331,0.000008997611],"about_ca_topic_score_codex":0.0060652755,"about_ca_topic_score_gemma":0.0029807591,"teacher_disagreement_score":0.0060652755,"about_ca_system_score_codex":0.00096100086,"about_ca_system_score_gemma":0.0011882909,"threshold_uncertainty_score":0.020164847},"labels":[],"label_agreement":null},{"id":"W4251812827","doi":"10.1088/1755-1315/431/1/011001","title":"Preface","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Library science; China; Beijing; Research center; Political science; Technical university; Engineering; Computer science","score_opus":0.010948733083656183,"score_gpt":0.16598987506051885,"score_spread":0.15504114197686267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251812827","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021610686,0.014184973,0.008253118,0.033602178,0.12748589,0.00069063803,0.014311266,0.0023953929,0.79691553],"genre_scores_gemma":[0.009770182,0.008746825,0.0041482905,0.00855064,0.018270738,0.00045348037,0.0140061425,0.0012914154,0.93476224],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99835986,0.0002277175,0.00013192318,0.0003409413,0.00078824116,0.00015140668],"domain_scores_gemma":[0.99467355,0.00083454396,0.0002162619,0.00054988294,0.0030499767,0.0006758027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016547692,0.0011875168,0.0009228838,0.0027473844,0.0032982123,0.005413967,0.0019411858,0.0018947094,0.48427042],"category_scores_gemma":[0.011870843,0.000402332,0.00075858796,0.0024262941,0.0009817306,0.0039786724,0.0027073065,0.0036651222,0.3460874],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034745965,0.000019871786,0.00013856169,0.00015733458,0.0000033270712,0.00007568084,0.00017473294,0.000072411356,0.00014868533,0.0061705136,0.94916636,0.043837663],"study_design_scores_gemma":[0.0000029673454,0.00001255195,0.000175981,0.00010956764,0.0000014831189,0.00008007796,0.00012628104,0.000024604604,0.000061394094,0.0017773749,0.997623,0.0000046472305],"about_ca_topic_score_codex":0.003435623,"about_ca_topic_score_gemma":0.0034425014,"teacher_disagreement_score":0.48427042,"about_ca_system_score_codex":0.002400711,"about_ca_system_score_gemma":0.0030313332,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4251978845","doi":"10.1002/j.1551-8833.2004.tb10701.x","title":"Report from Infonetrix Indicates Rebound in Water/Wastewater Automation Markets","year":2004,"lang":"en","type":"article","venue":"American Water Works Association","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Automation; Business; Product (mathematics); Service (business); Marketing; Wastewater; Market research; Industrial organization; Engineering; Waste management","score_opus":0.002814300751718886,"score_gpt":0.1826378008910992,"score_spread":0.17982350013938034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251978845","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041390646,0.0019798651,0.002418759,0.045416232,0.0047059837,0.00026307045,0.036603343,0.0032033082,0.8640187],"genre_scores_gemma":[0.097088136,0.0030857394,0.0036842325,0.0077566532,0.0012809962,0.00016513426,0.033515032,0.0010712764,0.85235286],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99806565,0.000117989424,0.00009309232,0.00014130471,0.0013372262,0.00024480713],"domain_scores_gemma":[0.99671483,0.00042222734,0.00048599322,0.00018931933,0.0017876774,0.00039997685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014024263,0.00055765174,0.00024025177,0.0018210262,0.0013533359,0.0065668374,0.000630302,0.0019496017,0.09026194],"category_scores_gemma":[0.0037929583,0.00028497784,0.000363783,0.002641795,0.0003871228,0.003851357,0.001180463,0.0018326298,0.024055175],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011135933,0.00006061926,0.0031924432,0.000083495645,0.0000050103454,0.00022833093,0.00026267295,0.00019787645,0.0010898389,0.006725842,0.9481993,0.039843228],"study_design_scores_gemma":[0.0000077925415,0.000031798732,0.0052996506,0.000019017287,0.000004623581,0.000062840925,0.00035496138,0.00031153628,0.0017542877,0.0003746739,0.9917704,0.000008494762],"about_ca_topic_score_codex":0.037292127,"about_ca_topic_score_gemma":0.048553716,"teacher_disagreement_score":0.09026194,"about_ca_system_score_codex":0.0032699427,"about_ca_system_score_gemma":0.0062147602,"threshold_uncertainty_score":0.30195624},"labels":[],"label_agreement":null},{"id":"W4252379425","doi":"10.32920/ryerson.14660664","title":"Exploring Motivations for Participation in Different Modes of Urban Community Energy Development in Ontario, Canada","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Context (archaeology); Stakeholder; Sustainability; Business; Energy planning; Stakeholder engagement; Local community; Marketing; Environmental economics; Renewable energy; Environmental resource management; Public relations; Economics; Political science; Geography; Engineering","score_opus":0.1133726774763574,"score_gpt":0.22804922066746508,"score_spread":0.11467654319110768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252379425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9900885,0.00013625665,0.00016030966,0.0008569714,0.000011505655,0.00011935583,0.00018648086,0.0000058979044,0.008434838],"genre_scores_gemma":[0.9915452,0.00022363485,0.00031535464,0.00014645478,0.0000026418259,0.0000573208,0.00009678575,0.000007978384,0.0076047312],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9979876,0.00046658158,0.000069882764,0.00017626827,0.00056402263,0.0007355944],"domain_scores_gemma":[0.99624544,0.0006618266,0.00033113649,0.00007385906,0.0011769593,0.0015108018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018275123,0.00023221342,0.00031364665,0.0010419739,0.013567419,0.0030954885,0.0011821757,0.00059489906,0.0034123769],"category_scores_gemma":[0.0030299746,0.00039735172,0.00028996725,0.0017515479,0.0029121935,0.00080541486,0.0024809581,0.0008863899,0.00018784667],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014912094,0.00029688794,0.2928364,0.0002108372,0.000029371748,0.0017406882,0.65965486,0.0003274854,0.0022319546,0.0043096086,0.005968559,0.03224416],"study_design_scores_gemma":[0.0000089483465,0.000049749247,0.27738962,0.00009996458,0.00000836701,0.00011275414,0.69528526,0.0005587687,0.00023871395,0.00020441589,0.025998266,0.00004522598],"about_ca_topic_score_codex":0.99161583,"about_ca_topic_score_gemma":0.9984137,"teacher_disagreement_score":0.05927484,"about_ca_system_score_codex":0.05927484,"about_ca_system_score_gemma":0.067213014,"threshold_uncertainty_score":0.43007106},"labels":[],"label_agreement":null},{"id":"W4253656103","doi":"10.2523/88528-ms","title":"Apache Energy - Knowledge Management System","year":2004,"lang":"en","type":"article","venue":"Proceedings of SPE Asia Pacific Oil and Gas Conference and Exhibition","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Computer science","score_opus":0.00936350898016838,"score_gpt":0.1819819328505726,"score_spread":0.17261842387040421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253656103","genre_codex":"software","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011919719,0.00085436855,0.17108084,0.001804899,0.00035805552,0.0019244462,0.118541315,0.5063877,0.18712859],"genre_scores_gemma":[0.17058808,0.0017512069,0.20561238,0.0013709274,0.00029406187,0.0024676388,0.48340806,0.022735944,0.11177163],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988883,0.00012156716,0.00016483996,0.00024940062,0.00044298745,0.00013300453],"domain_scores_gemma":[0.9976484,0.00039013792,0.00017270034,0.0007415133,0.0008140964,0.00023320272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015599731,0.0010582559,0.0008423144,0.0037882528,0.00088843534,0.0042615235,0.002769498,0.0009008607,0.040524855],"category_scores_gemma":[0.004612763,0.00066064263,0.0005869092,0.003728768,0.00041148294,0.0043823845,0.002474295,0.0014465785,0.03525425],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057146314,0.00042918758,0.0037343733,0.00073269353,0.00013303646,0.0004466986,0.00035462674,0.0067377626,0.0029347108,0.019005768,0.7417983,0.22312146],"study_design_scores_gemma":[0.00031710186,0.000064795495,0.0057310476,0.00017731317,0.00010082999,0.00041611693,0.00028696904,0.06843181,0.009010367,0.036419604,0.87888145,0.00016256963],"about_ca_topic_score_codex":0.008971436,"about_ca_topic_score_gemma":0.0057171183,"teacher_disagreement_score":0.040524855,"about_ca_system_score_codex":0.0012366486,"about_ca_system_score_gemma":0.0026753931,"threshold_uncertainty_score":0.13556921},"labels":[],"label_agreement":null},{"id":"W4254198339","doi":"10.22215/timreview925","title":"Using Entrepreneurial Marketing to Foster Reseller Adoption of Smart Micro-Grid Technology","year":2015,"lang":"en","type":"article","venue":"Technology Innovation Management Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Business; Grid; Smart grid; Marketing; Engineering; Mathematics; Electrical engineering","score_opus":0.04371933660691164,"score_gpt":0.2804779758387261,"score_spread":0.23675863923181445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254198339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5135027,0.08872183,0.016004922,0.023587704,0.0020534974,0.00071424805,0.00006628255,0.0004231021,0.3549257],"genre_scores_gemma":[0.9139725,0.056096558,0.008604788,0.0023399384,0.000720868,0.00019916345,0.000047377158,0.00003793268,0.017980954],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99939466,0.00027229075,0.000016385817,0.000038600112,0.00017066272,0.00010744324],"domain_scores_gemma":[0.9979942,0.001278133,0.00029709024,0.00006620702,0.00018284879,0.00018156623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017087945,0.00022637371,0.00014662716,0.000648241,0.00054136285,0.0012680449,0.00037089485,0.00058520405,0.004666152],"category_scores_gemma":[0.00280808,0.000077652425,0.00026676437,0.0005613998,0.0004348499,0.0013843015,0.00069844,0.00071335706,0.0004707131],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017762205,0.0012422677,0.0044574016,0.0015073833,0.000053354444,0.0003433621,0.00095017755,0.0005861402,0.0031858666,0.035507422,0.013683333,0.93830574],"study_design_scores_gemma":[0.00064526807,0.0032187786,0.0582198,0.004218042,0.00032108932,0.0014519162,0.0055735824,0.007721769,0.04011513,0.040296443,0.83812106,0.0000971606],"about_ca_topic_score_codex":0.00052468583,"about_ca_topic_score_gemma":0.001451596,"teacher_disagreement_score":0.004666152,"about_ca_system_score_codex":0.0006175796,"about_ca_system_score_gemma":0.00095190876,"threshold_uncertainty_score":0.015609801},"labels":[],"label_agreement":null},{"id":"W4254271241","doi":"10.1109/mpel.2020.3033691","title":"PEDG 2021","year":2020,"lang":"en","type":"article","venue":"IEEE Power Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of New Brunswick","funders":"University of Illinois at Urbana-Champaign","keywords":"Computer science","score_opus":0.00734305992924171,"score_gpt":0.1890688134442006,"score_spread":0.1817257535149589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254271241","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012970732,0.0022676124,0.0030595388,0.014678764,0.011798757,0.000332443,0.023221858,0.0027524286,0.94059163],"genre_scores_gemma":[0.005775843,0.0010274722,0.0013787217,0.0076805833,0.0007763642,0.00015333218,0.013466854,0.0005538509,0.9691869],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993912,0.000059717466,0.000017632157,0.000105836545,0.00025388916,0.00017168814],"domain_scores_gemma":[0.9988469,0.000069802794,0.000044524324,0.0000696377,0.0004491654,0.0005200117],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011135426,0.0007096792,0.00038302442,0.00084561115,0.00086491974,0.0033665453,0.0010986604,0.003328511,0.5379991],"category_scores_gemma":[0.0019218863,0.00030156883,0.00034575764,0.00052603416,0.00023908386,0.0014049989,0.0023036692,0.001615856,0.43892172],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006572871,0.000027686556,0.00011221561,0.00007102794,0.0000022080837,0.000048328227,0.000007653625,0.00006226281,0.0003049132,0.003026788,0.95217645,0.044094726],"study_design_scores_gemma":[0.000007858105,0.00001602708,0.0002532592,0.000024281799,9.256281e-7,0.0000320798,0.000008210866,0.00005460998,0.0001396407,0.0005643077,0.9988967,0.0000021064657],"about_ca_topic_score_codex":0.0030204395,"about_ca_topic_score_gemma":0.006397435,"teacher_disagreement_score":0.4620009,"about_ca_system_score_codex":0.0013829396,"about_ca_system_score_gemma":0.0030202786,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4254922930","doi":"10.1201/b13003-5","title":"Global Smart Grid Initiatives","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Grid; Computer science; Business; Geography; Engineering; Electrical engineering; Geodesy","score_opus":0.016605133307688796,"score_gpt":0.21678548997442915,"score_spread":0.20018035666674036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254922930","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00040387837,0.021545978,0.0012716944,0.002271056,0.0015223051,0.000058617337,0.00057480345,0.00047463,0.9718769],"genre_scores_gemma":[0.0052268775,0.056610752,0.003713401,0.002599458,0.0007795876,0.000104251565,0.0020641063,0.00047422136,0.9284274],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99963045,0.000032960725,0.000013804247,0.00006161545,0.00019395514,0.00006716399],"domain_scores_gemma":[0.9998294,0.000027404492,0.000010560175,0.000022181575,0.00006518583,0.00004514343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036733277,0.0010295259,0.00035084778,0.0020002124,0.001218574,0.004984958,0.00074091717,0.0013997923,0.13620728],"category_scores_gemma":[0.00061888,0.00030000595,0.00036376552,0.004910734,0.00058493105,0.00524842,0.0025589229,0.0019728558,0.084718525],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067301266,0.000031034226,0.000112021255,0.00031542208,0.0000027917383,0.00006817143,0.000327821,0.0002171449,0.00029049453,0.12510115,0.61049306,0.2630343],"study_design_scores_gemma":[4.0236475e-7,0.000001608043,0.00004262337,0.00006756778,4.403093e-7,0.00003505414,0.000030432308,0.000012419945,0.000026454474,0.0023308173,0.9974509,0.0000013060387],"about_ca_topic_score_codex":0.0026235413,"about_ca_topic_score_gemma":0.0058111404,"teacher_disagreement_score":0.13620728,"about_ca_system_score_codex":0.001975631,"about_ca_system_score_gemma":0.002224012,"threshold_uncertainty_score":0.45565873},"labels":[],"label_agreement":null},{"id":"W4255404477","doi":"10.24018/ejeng.2020.5.12.2295","title":"Optimal Sizing of a PV System in Golpayegan, Iran Using Thermal Modeling-based Load Demand","year":2020,"lang":"en","type":"article","venue":"European Journal of Engineering and Technology Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Photovoltaic system; Sizing; Automotive engineering; Grid-connected photovoltaic power system; Environmental science; Grid; Diesel fuel; Load profile; Battery (electricity); Solar irradiance; Computer science; Engineering; Maximum power point tracking; Electrical engineering; Power (physics); Meteorology; Electricity; Voltage; Inverter","score_opus":0.047680360297820926,"score_gpt":0.250592425305685,"score_spread":0.20291206500786407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255404477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8293946,0.0004348406,0.14364277,0.0002847674,0.000034579578,0.00020357007,0.00046052935,0.0005637497,0.024980582],"genre_scores_gemma":[0.98988485,0.000071276074,0.008849914,0.000009237053,0.0000027967653,0.000046053847,0.00007521035,0.000018228073,0.0010424794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989235,0.000030721356,0.0000031240327,0.000019407044,0.000028173818,0.00002633389],"domain_scores_gemma":[0.9999343,0.000023833085,0.0000131360475,0.0000036686984,0.000019483094,0.0000056286026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019171406,0.00062966405,0.00046083122,0.00042122783,0.00052073115,0.0009241482,0.0004737161,0.00033323496,0.0020836766],"category_scores_gemma":[0.00026784034,0.0004643575,0.00051330926,0.00038745304,0.0002151317,0.0004012203,0.0002787957,0.0003249677,0.00022427649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004025389,0.000024001969,0.0012954107,0.000041475003,0.00001785552,0.000090847905,0.000025653313,0.98470044,0.0030232673,0.00074798963,0.0004049481,0.009587873],"study_design_scores_gemma":[0.000021762984,0.000065366236,0.0019944971,0.00000420425,0.0000239706,0.00002978505,0.00006278247,0.9951481,0.0012746435,0.00084935565,0.00051818957,0.0000072890602],"about_ca_topic_score_codex":0.022111109,"about_ca_topic_score_gemma":0.036288805,"teacher_disagreement_score":0.022111109,"about_ca_system_score_codex":0.0013380616,"about_ca_system_score_gemma":0.0014747299,"threshold_uncertainty_score":0.043964863},"labels":[],"label_agreement":null},{"id":"W4255666723","doi":"10.17559/tv-20160915124352","title":"An Energy Efficient Architecture for IoT Based Automated Smart Micro-Grid","year":2018,"lang":"en","type":"article","venue":"Tehnicki vjesnik - Technical Gazette","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Northwestern Polytechnic","funders":"","keywords":"Architecture; Computer science; Internet of Things; Smart grid; Embedded system; Computer architecture; Distributed computing; Energy (signal processing); Engineering; Electrical engineering; Geography; Physics","score_opus":0.0069323713204516866,"score_gpt":0.22921340441492924,"score_spread":0.22228103309447755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255666723","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05370345,0.00058786833,0.9035137,0.0008090166,0.0002072661,0.00023566537,0.00015764139,0.00569687,0.035088513],"genre_scores_gemma":[0.7767361,0.00057120266,0.20412162,0.00023927182,0.000058835154,0.0002441728,0.0003571636,0.00014351771,0.017528273],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999876,0.000018555487,0.000011859666,0.000027903956,0.000042191292,0.000023520131],"domain_scores_gemma":[0.99993265,0.0000064778287,0.0000073452297,0.000016317254,0.000026784945,0.000010386785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013923361,0.00025149854,0.00026134876,0.00026276114,0.00048318467,0.0009844862,0.00081591855,0.00044750888,0.0029173335],"category_scores_gemma":[0.000155581,0.00017090325,0.0002487098,0.00031037576,0.00029648494,0.0009051356,0.00068821217,0.0004625504,0.0008284047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037188275,0.0003322747,0.0036928852,0.0003919546,0.00012686191,0.0011672559,0.00071450876,0.30113074,0.11027486,0.2847236,0.023651423,0.27342182],"study_design_scores_gemma":[0.000049425045,0.00022015018,0.0013394604,0.000050988565,0.00007074864,0.00039143817,0.00017868867,0.84568846,0.028186964,0.04449321,0.0792816,0.000048882222],"about_ca_topic_score_codex":0.0018356923,"about_ca_topic_score_gemma":0.0028908753,"teacher_disagreement_score":0.0029173335,"about_ca_system_score_codex":0.00051186624,"about_ca_system_score_gemma":0.00062557973,"threshold_uncertainty_score":0.009759426},"labels":[],"label_agreement":null},{"id":"W4255829253","doi":"10.32920/ryerson.14643837.v1","title":"Conceptual Framework for Enhancing Energy Disaggregation Using Crowd and Context","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Workflow; Computer science; Context (archaeology); Automation; Energy consumption; Data science; Crowdsourcing; Energy (signal processing); Audit; Consumption (sociology); Data mining; Artificial intelligence; Database; World Wide Web; Engineering; Business","score_opus":0.023895260357764937,"score_gpt":0.24440239238746814,"score_spread":0.2205071320297032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255829253","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005867995,0.00053883396,0.9656705,0.0030123834,0.00016572185,0.00032332414,0.00038612523,0.0006149321,0.02342025],"genre_scores_gemma":[0.23413123,0.00094999454,0.7554681,0.0006374933,0.00017486732,0.00071945257,0.00078451086,0.00022431128,0.006910082],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99676716,0.0013390108,0.00021349684,0.00078859675,0.0006399505,0.00025170043],"domain_scores_gemma":[0.9961397,0.0014921139,0.00033782338,0.00091118674,0.0006758913,0.00044328318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059251543,0.001209989,0.0007310775,0.0032583787,0.0023459196,0.006385068,0.0029751996,0.0023040476,0.005348768],"category_scores_gemma":[0.008495865,0.00079581415,0.0018405172,0.0024899265,0.0045603067,0.009233013,0.009122727,0.0022279073,0.0011800196],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046103483,0.00008880147,0.0016620666,0.00023641468,0.00006103655,0.0003127598,0.0022209145,0.02905641,0.001717589,0.92952377,0.0032971685,0.031776976],"study_design_scores_gemma":[0.000040793664,0.000068949594,0.00095340685,0.0003447263,0.0000820914,0.00029704653,0.002402594,0.14919017,0.0025237834,0.70798546,0.13601471,0.00009623999],"about_ca_topic_score_codex":0.011266142,"about_ca_topic_score_gemma":0.009615195,"teacher_disagreement_score":0.011266142,"about_ca_system_score_codex":0.0021256143,"about_ca_system_score_gemma":0.0036651797,"threshold_uncertainty_score":0.031335533},"labels":[],"label_agreement":null},{"id":"W4256692735","doi":"10.1016/s1464-2859(04)00231-7","title":"Alpha Technologies, Ballard collaborating on cable TV backup power","year":2004,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Broadband; Backup; Engineering; Telecommunications; Electrical engineering; Power (physics); Power cable; Cable television; Mechanical engineering","score_opus":0.004487059858411759,"score_gpt":0.16827567744145772,"score_spread":0.16378861758304597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256692735","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010272968,0.0064755306,0.008660934,0.017236408,0.0047368472,0.00019691196,0.00069203466,0.0018641783,0.9498642],"genre_scores_gemma":[0.01161488,0.0010372977,0.0018163453,0.00046739247,0.00018394503,0.000010301759,0.00023721177,0.00016397523,0.98446876],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982298,0.00008195487,0.00004434875,0.00025282137,0.0011512481,0.00023991497],"domain_scores_gemma":[0.99725085,0.00012695977,0.000064069434,0.00014964423,0.0019353718,0.00047308995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012944783,0.0005618661,0.00027552777,0.0011728907,0.0035067413,0.0026479936,0.0006892853,0.0017352335,0.10626814],"category_scores_gemma":[0.00171468,0.00043138798,0.00023894757,0.0010072044,0.00047834328,0.0014963669,0.00077641616,0.0021184213,0.025019158],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008432582,0.00007100154,0.0009967372,0.00008626736,0.0000047152716,0.00028442466,0.00037174037,0.00031079835,0.0050112978,0.014428705,0.82825845,0.15009165],"study_design_scores_gemma":[0.000004209639,0.000031145213,0.0006625143,0.000012688742,0.0000025535674,0.00016975212,0.000078256206,0.0001602632,0.0013803699,0.00026363228,0.9972307,0.0000039552197],"about_ca_topic_score_codex":0.09205636,"about_ca_topic_score_gemma":0.16785818,"teacher_disagreement_score":0.10626814,"about_ca_system_score_codex":0.0030533413,"about_ca_system_score_gemma":0.00607225,"threshold_uncertainty_score":0.3555023},"labels":[],"label_agreement":null},{"id":"W42788336","doi":"","title":"Agent-based Transactions for Home Energy Services.","year":2005,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Computer security","score_opus":0.006662550187284227,"score_gpt":0.18477245511345494,"score_spread":0.1781099049261707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W42788336","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056045726,0.0200477,0.7346519,0.008725933,0.0038482633,0.00093065074,0.0017964484,0.0070128376,0.21738166],"genre_scores_gemma":[0.2539329,0.017761739,0.48814756,0.003476192,0.0025332174,0.0017203952,0.0060882247,0.00145394,0.2248859],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99707913,0.0008681583,0.00035760444,0.00033486605,0.0011745756,0.00018558804],"domain_scores_gemma":[0.9975273,0.00078162324,0.00020751524,0.00083736377,0.00044733356,0.00019886915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002262695,0.0012729974,0.0010414812,0.0009201111,0.0011224316,0.0050796443,0.0021266886,0.0031292913,0.035686977],"category_scores_gemma":[0.0061779586,0.00058849517,0.0006860217,0.0020057438,0.001286716,0.0073520117,0.0023473317,0.0028093464,0.018829765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020388853,0.00013539588,0.0004210775,0.0005970108,0.000071713235,0.0004743804,0.00029527186,0.0056139785,0.0029712452,0.6970874,0.08833458,0.20379402],"study_design_scores_gemma":[0.000106504514,0.00010106067,0.00030941525,0.00028505403,0.000043366574,0.0009505059,0.00014941624,0.060487926,0.0023229804,0.37763202,0.5575691,0.000042643325],"about_ca_topic_score_codex":0.0013586036,"about_ca_topic_score_gemma":0.0014843422,"teacher_disagreement_score":0.035686977,"about_ca_system_score_codex":0.0011939945,"about_ca_system_score_gemma":0.0010958127,"threshold_uncertainty_score":0.119384825},"labels":[],"label_agreement":null},{"id":"W4280524348","doi":"10.32006/eeep.2022.1.2234","title":"ALTERNATIVE APPROACH TO SMALL SCALE PHOTOVOLTAIC SOLAR POWER AND ENERGY STORAGE","year":2022,"lang":"en","type":"article","venue":"Ecological Engineering and Environment Protection","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Mains electricity; Electricity; Energy storage; Energy supply; Electrical engineering; Automotive engineering; Engineering; Computer science; Power (physics); Economics; Voltage; Energy (signal processing)","score_opus":0.007469433993765168,"score_gpt":0.1418601876463189,"score_spread":0.13439075365255373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280524348","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12682462,0.004178583,0.6789358,0.003105834,0.0011124482,0.0007036235,0.00062791136,0.0023893672,0.18212184],"genre_scores_gemma":[0.7568814,0.0019833674,0.14897996,0.0006585469,0.00023077797,0.00028570095,0.00032226823,0.00009485345,0.09056312],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997584,0.000040542156,0.000010679455,0.00005345862,0.000116346644,0.000020473317],"domain_scores_gemma":[0.99985087,0.00002601358,0.000015028635,0.000043209202,0.000050590006,0.000014275406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014536329,0.00026271833,0.00030397912,0.00041943113,0.00037969626,0.000966455,0.001319844,0.00075417635,0.010674464],"category_scores_gemma":[0.00024013016,0.00014032736,0.00042533828,0.0006111041,0.00038572514,0.0009150578,0.0006248501,0.0005495153,0.002208243],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052620476,0.0007738878,0.0017385007,0.0009192021,0.0001142492,0.0009626584,0.00031964917,0.016313864,0.21191964,0.17290714,0.015898634,0.57760644],"study_design_scores_gemma":[0.00036478238,0.002647463,0.0046417434,0.00022831309,0.00017546915,0.00309733,0.00051943184,0.15269049,0.20509054,0.09662502,0.53376186,0.00015754894],"about_ca_topic_score_codex":0.0006439706,"about_ca_topic_score_gemma":0.0016293948,"teacher_disagreement_score":0.010674464,"about_ca_system_score_codex":0.0003685863,"about_ca_system_score_gemma":0.00042379042,"threshold_uncertainty_score":0.03570968},"labels":[],"label_agreement":null},{"id":"W4280642238","doi":"10.3389/fenrg.2022.861571","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Computer science; Energy management; Grid; Scheduling (production processes); Load management; Demand side; Distributed computing; Load balancing (electrical power); Electricity; Engineering; Energy (signal processing); Operations management; Environmental economics; Electrical engineering","score_opus":0.019871017925453295,"score_gpt":0.2541826947727595,"score_spread":0.23431167684730622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280642238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035101105,0.0034565146,0.9368103,0.0004796614,0.00015879273,0.000097032964,0.00013692628,0.0003407388,0.023418956],"genre_scores_gemma":[0.9389933,0.002975001,0.051331177,0.000070334776,0.00011463035,0.000070985254,0.00013668915,0.000083956256,0.006224041],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997533,0.000076232,0.000012876067,0.000051790732,0.00006381484,0.00004201111],"domain_scores_gemma":[0.999863,0.000047705587,0.000023441786,0.000011017928,0.00004405545,0.000010589737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029980435,0.00060712267,0.0006911011,0.00029713748,0.0002407131,0.0011229181,0.0005400198,0.00039058004,0.0024388258],"category_scores_gemma":[0.00053249113,0.00025615073,0.0003269849,0.0005807539,0.00021077329,0.0007664447,0.00035847252,0.00038354343,0.00037219282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095319534,0.00006963652,0.0007449787,0.00034875816,0.000057912006,0.00008159739,0.000058216894,0.8576605,0.0059950165,0.028599579,0.0036312144,0.10265729],"study_design_scores_gemma":[0.000008310612,0.000039857965,0.00034374167,0.000015717256,0.000015085403,0.00002360716,0.00002946365,0.9875185,0.0010946349,0.007501768,0.0034034795,0.0000057915977],"about_ca_topic_score_codex":0.0022315958,"about_ca_topic_score_gemma":0.0030255672,"teacher_disagreement_score":0.0024388258,"about_ca_system_score_codex":0.00060516404,"about_ca_system_score_gemma":0.0008637728,"threshold_uncertainty_score":0.008158624},"labels":[],"label_agreement":null},{"id":"W4281392643","doi":"10.1109/iciset54810.2022.9775844","title":"Prospects of Smart Metering System in Bangladesh: Cost Benefit Analysis","year":2022,"lang":"en","type":"article","venue":"2022 International Conference on Innovations in Science, Engineering and Technology (ICISET)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Installation; Metering mode; Smart meter; Metre; Cost analysis; Cost–benefit analysis; Smart grid; Electricity; Total cost; Computer science; Engineering; Telecommunications; Reliability engineering; Business; Electrical engineering; Operating system","score_opus":0.013512352323247453,"score_gpt":0.2329300733030687,"score_spread":0.21941772097982123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281392643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89369994,0.0033972657,0.007963093,0.0029187235,0.000051117757,0.0007564184,0.0030384054,0.00008082009,0.08809421],"genre_scores_gemma":[0.99338734,0.0010765967,0.0014197264,0.000050913295,0.000009503464,0.00008472987,0.00030642338,0.0000069373837,0.0036578528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99846184,0.00082487473,0.000049458085,0.000092027345,0.00036667846,0.00020498106],"domain_scores_gemma":[0.9968688,0.0018552031,0.00022907421,0.00010000146,0.000789724,0.00015724998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022265573,0.00047312788,0.00038014192,0.0015677304,0.00041301185,0.0015604709,0.00059508707,0.0008381152,0.008841085],"category_scores_gemma":[0.004114038,0.00024013977,0.00068985904,0.0019796658,0.00034725128,0.001709334,0.00066092034,0.00063371036,0.00062646635],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004619811,0.0010842221,0.1420436,0.002429601,0.0005076539,0.0030365423,0.0008675907,0.5157903,0.009165564,0.07244289,0.011441296,0.23657088],"study_design_scores_gemma":[0.00059482077,0.008873405,0.23392725,0.00078545255,0.001625416,0.0021687967,0.008932498,0.64757466,0.011017746,0.030457567,0.053659007,0.00038335132],"about_ca_topic_score_codex":0.017482638,"about_ca_topic_score_gemma":0.018889097,"teacher_disagreement_score":0.017482638,"about_ca_system_score_codex":0.0054517332,"about_ca_system_score_gemma":0.0014205012,"threshold_uncertainty_score":0.03955531},"labels":[],"label_agreement":null},{"id":"W4283219995","doi":"10.1109/infocomwkshps54753.2022.9798328","title":"Dynamic Load Combined Prediction Framework with Collaborative Cloud-Edge for Microgrid","year":2022,"lang":"en","type":"article","venue":"IEEE INFOCOM 2022 - IEEE Conference on Computer Communications Workshops (INFOCOM WKSHPS)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Research and Development","keywords":"Computer science; Cloud computing; Microgrid; Enhanced Data Rates for GSM Evolution; Edge computing; Exploit; Anomaly detection; Edge device; Data mining; Scheduling (production processes); Data modeling; Process (computing); Machine learning; Distributed computing; Artificial intelligence; Real-time computing; Engineering; Database","score_opus":0.01848483767065387,"score_gpt":0.24494882454134909,"score_spread":0.22646398687069522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283219995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08613814,0.00026387456,0.9088779,0.00029584777,0.00007700359,0.000036513185,0.00011836479,0.0014742514,0.0027181148],"genre_scores_gemma":[0.97082967,0.000068840935,0.0281513,0.000063615385,0.000030316298,0.000020518139,0.000089224355,0.000026631516,0.0007198774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971586,0.000047230023,0.000013766392,0.00008127243,0.00007956735,0.00006214969],"domain_scores_gemma":[0.99972695,0.00006502238,0.000037619906,0.000052849566,0.000084947234,0.000032531585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048290702,0.00066944933,0.000668891,0.00024291073,0.00043723334,0.000579446,0.0012369739,0.00042210796,0.00088965014],"category_scores_gemma":[0.00088909426,0.0002437931,0.00034522638,0.0004108125,0.00035683505,0.0012748374,0.0010145985,0.00073477905,0.0001869579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024423405,0.00011463832,0.0033908295,0.000033702607,0.000055050405,0.00017516385,0.00010613713,0.89263576,0.004248705,0.0038621887,0.002133182,0.09300031],"study_design_scores_gemma":[0.000001962669,0.00000807434,0.0000848895,5.717481e-7,0.0000022355296,0.000005953055,0.000004745918,0.99897987,0.00026341478,0.00056449755,0.00008175072,0.0000020405805],"about_ca_topic_score_codex":0.01183689,"about_ca_topic_score_gemma":0.01255489,"teacher_disagreement_score":0.01183689,"about_ca_system_score_codex":0.0003955914,"about_ca_system_score_gemma":0.0007633461,"threshold_uncertainty_score":0.023535967},"labels":[],"label_agreement":null},{"id":"W4283326396","doi":"10.1049/enc2.12059","title":"Tuning of renewable energy bids based on energy risk management: Enhanced microgrids with pareto‐optimal profits for the utility and prosumers","year":2022,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Renewable energy; CVAR; Wind power; Expected shortfall; Portfolio optimization; Portfolio; Computer science; Microeconomics; Environmental economics; Economics; Engineering; Finance; Electrical engineering","score_opus":0.005405171520005992,"score_gpt":0.1574216751005921,"score_spread":0.1520165035805861,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283326396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32976568,0.00024738387,0.6604039,0.00024901793,0.00003598619,0.00014984983,0.000059590748,0.0003039054,0.008784696],"genre_scores_gemma":[0.98857456,0.000022145949,0.010928056,0.000014961509,0.000004952375,0.00002653361,0.000009588533,0.000009344146,0.0004098353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995377,0.00020372779,0.000021136197,0.000056532444,0.00011144501,0.000069613525],"domain_scores_gemma":[0.9994702,0.00022352174,0.00011393968,0.000052654654,0.00009570493,0.000044061413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013009476,0.00088048796,0.00081462355,0.0003376091,0.0002990986,0.0010622689,0.00074048585,0.00044517196,0.0009875214],"category_scores_gemma":[0.002066708,0.00036815682,0.00037956072,0.000298925,0.00035387572,0.00066129206,0.00080329325,0.00053473364,0.00015918276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006141772,0.000056761648,0.00057069276,0.000015158188,0.00002353184,0.000050595278,0.000024691139,0.98305905,0.0016705157,0.0020966092,0.00017504407,0.012195906],"study_design_scores_gemma":[0.0000069014304,0.000032668377,0.00013454449,0.0000023762639,0.000006080213,0.000008917038,0.000010221417,0.9983693,0.00045909343,0.0008994487,0.00006772267,0.0000027793421],"about_ca_topic_score_codex":0.0017943017,"about_ca_topic_score_gemma":0.0016125282,"teacher_disagreement_score":0.0017943017,"about_ca_system_score_codex":0.0005979212,"about_ca_system_score_gemma":0.0007260048,"threshold_uncertainty_score":0.006880164},"labels":[],"label_agreement":null},{"id":"W4283361501","doi":"10.1049/enc2.12060","title":"Planning, operation, and trading mechanisms of transactive energy systems in the context of carbon neutrality","year":2022,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Asynchronous communication; Context (archaeology); Energy market; Distributed computing; Renewable energy; Environmental economics; Risk analysis (engineering); Operations research; Engineering; Business; Economics; Telecommunications","score_opus":0.009764581462822053,"score_gpt":0.1710740843548733,"score_spread":0.16130950289205126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283361501","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026891723,0.0032067634,0.95320857,0.002190492,0.00027516054,0.000114841896,0.000092068934,0.00019569536,0.013824743],"genre_scores_gemma":[0.86702317,0.005411829,0.11992088,0.00032568775,0.00026543456,0.0003193317,0.0001159863,0.00010035213,0.006517328],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984779,0.0005526887,0.00011007582,0.00032314291,0.0003253306,0.0002108987],"domain_scores_gemma":[0.9975811,0.0013318189,0.00037927707,0.00023720818,0.0003406812,0.00012991391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002817658,0.00068704045,0.00089668593,0.00056527084,0.0008132995,0.003654946,0.0018309506,0.0016617088,0.0030352843],"category_scores_gemma":[0.0046754098,0.0006826551,0.0010919471,0.0010514285,0.0020366083,0.0048171533,0.0020725282,0.001969507,0.0002638776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008743805,0.000039131202,0.0006788443,0.00024348621,0.000062190826,0.00022145246,0.00023625122,0.44660568,0.002156099,0.5111173,0.0018188417,0.036733344],"study_design_scores_gemma":[0.000024921866,0.00004726918,0.00022982487,0.00003535254,0.000035101384,0.00006854701,0.00011945681,0.8202971,0.0011677198,0.170593,0.0073537542,0.000027946968],"about_ca_topic_score_codex":0.00228882,"about_ca_topic_score_gemma":0.0012559723,"teacher_disagreement_score":0.003654946,"about_ca_system_score_codex":0.0015788061,"about_ca_system_score_gemma":0.002090395,"threshold_uncertainty_score":0.0149014},"labels":[],"label_agreement":null},{"id":"W4283755217","doi":"10.1016/j.enpol.2022.113147","title":"Developing future retail electricity markets with a customer-centric focus","year":2022,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council; Queen's University; Department for the Economy; Department for Employment and Learning, Northern Ireland","keywords":"Flexibility (engineering); Smart grid; Electricity; Renewable energy; Electricity retailing; Software deployment; Business; Energy transition; Environmental economics; Industrial organization; Grid; Electricity market; Marketing; Commerce; Telecommunications; Computer science; Engineering; Economics","score_opus":0.006295231934250671,"score_gpt":0.18893892068026732,"score_spread":0.18264368874601666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283755217","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.071700074,0.0029737744,0.3427795,0.09507752,0.0017044767,0.0010845519,0.0003269337,0.0012130858,0.4831401],"genre_scores_gemma":[0.63907045,0.0056769103,0.2689648,0.014036157,0.00082525954,0.00068318687,0.0004932199,0.00028865723,0.06996137],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987186,0.0004554477,0.00004181873,0.00012326553,0.00040395863,0.00025688685],"domain_scores_gemma":[0.9961565,0.0006116921,0.0003567788,0.00025050007,0.0015164234,0.0011081533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048643257,0.00036425292,0.00029870906,0.00055080635,0.0010374672,0.0066876225,0.001645191,0.0040298146,0.0155702],"category_scores_gemma":[0.004640304,0.0003981601,0.00048864714,0.00062158826,0.001387333,0.01296341,0.0029251932,0.0027389263,0.0037624403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003514566,0.00041872234,0.001294066,0.0003150892,0.000014778983,0.00021237611,0.00029112457,0.006732331,0.0048781885,0.8754278,0.040577423,0.06980308],"study_design_scores_gemma":[0.00008802842,0.00034052815,0.002380548,0.0005102116,0.000024520306,0.00041104044,0.0032558986,0.035519797,0.0061147967,0.46418706,0.48707572,0.00009182536],"about_ca_topic_score_codex":0.0012376255,"about_ca_topic_score_gemma":0.0034716737,"teacher_disagreement_score":0.0155702,"about_ca_system_score_codex":0.0026589811,"about_ca_system_score_gemma":0.008297737,"threshold_uncertainty_score":0.052087486},"labels":[],"label_agreement":null},{"id":"W4283808144","doi":"10.3390/su14138108","title":"Survey of Simulation Tools to Assess Techno-Economic Benefits of Smart Grid Technology in Integrated T&amp;D Systems","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Scope (computer science); Computer science; Electric power system; Systems engineering; Scalability; Risk analysis (engineering); Engineering; Power (physics); Electrical engineering; Business","score_opus":0.03221330215133293,"score_gpt":0.2685749855619043,"score_spread":0.23636168341057134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283808144","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043434378,0.07580664,0.8164822,0.001938747,0.0006032258,0.00035655158,0.003650475,0.0035746216,0.05415319],"genre_scores_gemma":[0.50697273,0.14271519,0.33354765,0.00066559855,0.00054096524,0.0010305542,0.0064638364,0.0011866087,0.0068768016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99807847,0.0007484073,0.0002578489,0.00016202666,0.00064043194,0.00011280968],"domain_scores_gemma":[0.9927286,0.005502927,0.0003252285,0.0004499553,0.00090688514,0.0000865117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024686242,0.0015382606,0.0016962215,0.0035988856,0.000448275,0.002687574,0.0021332502,0.0015125106,0.0037047036],"category_scores_gemma":[0.010202629,0.0008573144,0.0020679475,0.0049541267,0.0005130889,0.0021767563,0.0011525358,0.0011327303,0.0010733585],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012129512,0.0001543549,0.0059572915,0.004030757,0.0003229195,0.00022842803,0.00027952352,0.6931374,0.0014430159,0.039247047,0.007259578,0.24781843],"study_design_scores_gemma":[0.000043661024,0.00009589568,0.0011995361,0.0016124852,0.00019388908,0.00014620936,0.000265935,0.9051894,0.0026004692,0.023508819,0.06506419,0.00007948916],"about_ca_topic_score_codex":0.0041917115,"about_ca_topic_score_gemma":0.0027046031,"teacher_disagreement_score":0.0041917115,"about_ca_system_score_codex":0.0009698102,"about_ca_system_score_gemma":0.0016122574,"threshold_uncertainty_score":0.013055503},"labels":[],"label_agreement":null},{"id":"W4283814659","doi":"10.1049/gtd2.12543","title":"Coordinated multi‐objective scheduling of a multi‐energy virtual power plant considering storages and demand response","year":2022,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Virtual power plant; Computer science; Scheduling (production processes); Response time; Distributed generation; Distributed computing; Renewable energy; Engineering; Electrical engineering; Operating system; Electricity; Operations management","score_opus":0.014085346816232755,"score_gpt":0.21458783719071076,"score_spread":0.200502490374478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283814659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38220116,0.00027257824,0.60027647,0.00048166333,0.000118472104,0.00020111428,0.0002933137,0.00030447636,0.01585066],"genre_scores_gemma":[0.9876276,0.00003416288,0.010769828,0.00001909104,0.000007632342,0.000053664735,0.000042493935,0.000012667022,0.0014327317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996138,0.0001571138,0.000011135496,0.00006588443,0.000054767777,0.00009729253],"domain_scores_gemma":[0.99950194,0.00020442618,0.00008525246,0.000023807585,0.000085109656,0.00009946712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008402238,0.0007273954,0.0011085966,0.00045094275,0.0006099031,0.0013366275,0.0009150199,0.00088653405,0.0027779539],"category_scores_gemma":[0.0009648109,0.0005612663,0.0005745337,0.00053757324,0.00056433846,0.0006885398,0.00073315634,0.0006574669,0.00015672242],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045068737,0.000013094429,0.000115314804,0.000010315879,0.000009723281,0.000041971278,0.0000060416137,0.99735487,0.00038293193,0.0008183933,0.00012264444,0.0010795433],"study_design_scores_gemma":[0.0000064739106,0.000025239913,0.00005251327,9.343619e-7,0.0000029278908,0.0000034104082,0.0000075000835,0.99941266,0.00010938382,0.00031686868,0.000060330338,0.0000017790576],"about_ca_topic_score_codex":0.00977226,"about_ca_topic_score_gemma":0.0063216356,"teacher_disagreement_score":0.00977226,"about_ca_system_score_codex":0.0011986312,"about_ca_system_score_gemma":0.0013746114,"threshold_uncertainty_score":0.019430757},"labels":[],"label_agreement":null},{"id":"W4285032518","doi":"10.22215/etd/2022-15028","title":"Non-Intrusive Load Monitoring Based User-Centric Demand Response for Smart Home Energy Management","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Demand response; Incentive; Demand side; Energy consumption; Consumption (sociology); Home automation; Smart grid; Energy management; Load management; Energy (signal processing); Environmental economics; Power demand; Electricity; Power (physics); Computer science; Power consumption; Engineering; Telecommunications; Economics; Microeconomics; Electrical engineering","score_opus":0.005532544224325986,"score_gpt":0.2181922271553597,"score_spread":0.21265968293103374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285032518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2988344,0.0012705636,0.66001314,0.0005995968,0.00027952562,0.00018706155,0.00051918696,0.0052843103,0.033012222],"genre_scores_gemma":[0.9642669,0.00022423358,0.029797446,0.00007086594,0.000048373677,0.00003425278,0.00019625694,0.000076909724,0.005284849],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986446,0.000028393479,0.0000057197312,0.000034346118,0.000048161728,0.000018907136],"domain_scores_gemma":[0.9998665,0.000045968172,0.00001781342,0.000026636857,0.000035484547,0.000007565312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014242872,0.00031731272,0.00024578063,0.00021159241,0.00014982697,0.00043927057,0.0003640054,0.00018966243,0.002459345],"category_scores_gemma":[0.00033521873,0.00013112278,0.0001218048,0.0002661932,0.00009452569,0.0005467323,0.0002959873,0.00032159287,0.000635402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008182454,0.0006691997,0.004136837,0.00023141813,0.000067967354,0.00016473398,0.0002365611,0.09479516,0.20317684,0.008001656,0.0140940435,0.6736073],"study_design_scores_gemma":[0.00002584474,0.00020541507,0.0037656075,0.000013109248,0.000021233003,0.000093098446,0.000063790045,0.9331491,0.052899055,0.0033863634,0.006355978,0.000021524613],"about_ca_topic_score_codex":0.0005084252,"about_ca_topic_score_gemma":0.0011151285,"teacher_disagreement_score":0.002459345,"about_ca_system_score_codex":0.00019526969,"about_ca_system_score_gemma":0.00017477665,"threshold_uncertainty_score":0.008227348},"labels":[],"label_agreement":null},{"id":"W4285105364","doi":"10.1109/access.2022.3175839","title":"A Discount-Based Time-of-Use Electricity Pricing Strategy for Demand Response With Minimum Information Using Reinforcement Learning","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"News aggregator; Computer science; Reinforcement learning; Demand response; Incentive; Operations research; Convergence (economics); Process (computing); Load management; Mathematical optimization; Electricity; Machine learning; Microeconomics; Economics","score_opus":0.0224057756084429,"score_gpt":0.2524391363746603,"score_spread":0.23003336076621742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285105364","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037765633,0.0001171833,0.9583325,0.00016699766,0.00003123373,0.00006505857,0.000018570998,0.00020262352,0.003300121],"genre_scores_gemma":[0.9603104,0.00005488071,0.03778903,0.00006203327,0.000014643184,0.00007209051,0.00002442914,0.000017438035,0.0016551724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959,0.0001434573,0.000022091914,0.00008394606,0.00010044921,0.000060138704],"domain_scores_gemma":[0.99940133,0.00030529045,0.00009799962,0.000036228306,0.00011157113,0.00004756674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083696475,0.00055892405,0.0006941305,0.00024195517,0.00021969328,0.0005054898,0.0009708895,0.0005871718,0.001489338],"category_scores_gemma":[0.001776526,0.00022397196,0.00036960305,0.0002348692,0.00042203953,0.00057303626,0.00065569946,0.0009160108,0.00022527133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020776308,0.0002368282,0.0009378169,0.00009768176,0.00006234753,0.00016267807,0.00013365631,0.8911849,0.007872989,0.017594226,0.0013669727,0.08014205],"study_design_scores_gemma":[0.0000075991707,0.000033495588,0.000043138298,0.000001846794,0.0000037710688,0.0000108351815,0.0000033877548,0.99840623,0.00031571536,0.000995915,0.00017511511,0.00000297734],"about_ca_topic_score_codex":0.0017305219,"about_ca_topic_score_gemma":0.0017291888,"teacher_disagreement_score":0.0017305219,"about_ca_system_score_codex":0.00047557996,"about_ca_system_score_gemma":0.0005588098,"threshold_uncertainty_score":0.0049823523},"labels":[],"label_agreement":null},{"id":"W4285127323","doi":"10.1016/b978-0-323-85527-3.00015-7","title":"Dancing with renewables: a holistic perspective encompassing the role of the demand side","year":2022,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Flexibility (engineering); Variable renewable energy; Renewable energy; Demand side; Electrification; Context (archaeology); Demand response; Risk analysis (engineering); Environmental economics; Computer science; Electric power system; Electricity; Engineering; Business; Economics; Power (physics); Electrical engineering","score_opus":0.00865856412231344,"score_gpt":0.1914557297336041,"score_spread":0.18279716561129067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285127323","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006188033,0.020028401,0.011693111,0.0075359973,0.0012020275,0.000014690769,0.000029191071,0.00003327858,0.9532752],"genre_scores_gemma":[0.38318235,0.055152766,0.009133305,0.0041325595,0.0015921621,0.00008533904,0.00008199919,0.00009540708,0.5465441],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997837,0.00007995605,0.0000052457945,0.000031227682,0.00006764474,0.000032179712],"domain_scores_gemma":[0.9998863,0.000052813244,0.0000072991934,0.000014737508,0.000015425683,0.000023516872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031735445,0.000577669,0.00034670197,0.00041701295,0.0011822877,0.0055098934,0.00071220973,0.001697879,0.014228637],"category_scores_gemma":[0.00031980916,0.00016334753,0.0002660727,0.0009995336,0.0025474122,0.004225468,0.0015514799,0.0019127405,0.0014807202],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000100383395,0.000035791454,0.00017294739,0.00013405121,0.000008333408,0.00013265459,0.0015464829,0.0017617665,0.00058152276,0.8984133,0.018826606,0.078376524],"study_design_scores_gemma":[0.000003929805,0.000040599156,0.0005615048,0.0005802417,0.000009533308,0.00027047834,0.0039553996,0.0019199497,0.00026462818,0.5640077,0.42837176,0.000014283592],"about_ca_topic_score_codex":0.0015152162,"about_ca_topic_score_gemma":0.00527512,"teacher_disagreement_score":0.014228637,"about_ca_system_score_codex":0.0009353203,"about_ca_system_score_gemma":0.0012747506,"threshold_uncertainty_score":0.047599554},"labels":[],"label_agreement":null},{"id":"W4285238437","doi":"10.1109/ojia.2022.3178235","title":"A Recommender System for Predictive Control of Heating Systems in Economic Demand Response Programs","year":2022,"lang":"en","type":"article","venue":"IEEE Open Journal of Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Flexibility (engineering); Leverage (statistics); Recommender system; Computer science; Demand response; Model predictive control; Context (archaeology); Control (management); Industrial engineering; Artificial intelligence; Machine learning; Engineering","score_opus":0.024742148204368052,"score_gpt":0.2627125101559998,"score_spread":0.23797036195163174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285238437","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046062812,0.0010189281,0.9468981,0.000498681,0.00019927538,0.00019345549,0.00027394437,0.0019358792,0.0029189955],"genre_scores_gemma":[0.85383904,0.00049933407,0.13969058,0.00034443228,0.0001749339,0.00026246568,0.00044049992,0.000060692037,0.004687981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985238,0.00046418412,0.00012736063,0.00047345718,0.0002667986,0.00014449918],"domain_scores_gemma":[0.99739057,0.001325042,0.0001929408,0.00025859335,0.0007210197,0.000111901056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021543046,0.00086569105,0.001492993,0.0006678311,0.0007785874,0.0011444215,0.0017907114,0.0017693007,0.002649073],"category_scores_gemma":[0.005106001,0.0004814739,0.00095012557,0.00071782555,0.0003859223,0.0011511281,0.0008235784,0.0014704956,0.0010770971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011372085,0.0007650367,0.008069263,0.0004671144,0.0004629918,0.00077869487,0.00055079197,0.51295006,0.018165004,0.011412549,0.010909341,0.43433192],"study_design_scores_gemma":[0.000029243125,0.00010452899,0.00059559505,0.000009783541,0.000043454067,0.000060655373,0.000027278003,0.9964283,0.0009494469,0.00074127107,0.0009923186,0.00001808975],"about_ca_topic_score_codex":0.01660458,"about_ca_topic_score_gemma":0.021745134,"teacher_disagreement_score":0.01660458,"about_ca_system_score_codex":0.0007182576,"about_ca_system_score_gemma":0.0007981604,"threshold_uncertainty_score":0.033015847},"labels":[],"label_agreement":null},{"id":"W4285261781","doi":"10.1007/978-981-19-1065-4_14","title":"Valuing Demand Response on Electric Vehicles Charging","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Environmental economics; Renewable energy; Demand response; Incentive; Volatility (finance); Electricity pricing; Valuation (finance); Electricity generation; Mains electricity; Business; Economics; Microeconomics; Power (physics); Electrical engineering; Engineering; Finance; Voltage","score_opus":0.007422571657140985,"score_gpt":0.18398050203656752,"score_spread":0.17655793037942652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285261781","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1822868,0.00745797,0.12918034,0.009519545,0.0014311015,0.0001561929,0.0007673668,0.00034783658,0.6688528],"genre_scores_gemma":[0.9315308,0.0024508846,0.0074705677,0.00026101712,0.0003080021,0.000045192344,0.00024276073,0.000102096135,0.057588574],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992768,0.00034275412,0.000016170075,0.00008412266,0.00019125086,0.00008888445],"domain_scores_gemma":[0.9980101,0.001545078,0.00006611848,0.00008717541,0.00018294956,0.00010850096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013517522,0.0008484792,0.0006324632,0.0005269711,0.00040756806,0.003136383,0.0007945051,0.0017640684,0.013910926],"category_scores_gemma":[0.0068866923,0.0002780649,0.00047930318,0.0009822058,0.00079277216,0.0037026345,0.00080834463,0.0018035234,0.0009644539],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004978188,0.00025915,0.002330247,0.00027097642,0.00008981267,0.0003813602,0.00026517146,0.27567825,0.0029137393,0.47727418,0.02488046,0.21515884],"study_design_scores_gemma":[0.000028004642,0.00026563197,0.0025342482,0.00025343228,0.000047767746,0.00014664668,0.00088178273,0.32931882,0.0011754378,0.6364611,0.028822089,0.000065025924],"about_ca_topic_score_codex":0.0019599267,"about_ca_topic_score_gemma":0.002470821,"teacher_disagreement_score":0.013910926,"about_ca_system_score_codex":0.0031751236,"about_ca_system_score_gemma":0.00080294354,"threshold_uncertainty_score":0.046536684},"labels":[],"label_agreement":null},{"id":"W4285288380","doi":"10.1109/icjece.2022.3151158","title":"A Parallel Bidirectional Long Short-Term Memory Model for Energy Disaggregation","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and Technology","keywords":"Computer science; Autoencoder; Benchmark (surveying); Convolutional neural network; Residual; Deep learning; Feature (linguistics); Convolution (computer science); Artificial intelligence; Hidden Markov model; Energy consumption; Energy (signal processing); Set (abstract data type); Recurrent neural network; Artificial neural network; Pattern recognition (psychology); Machine learning; Algorithm; Engineering","score_opus":0.00825316989159037,"score_gpt":0.16742976867961984,"score_spread":0.15917659878802948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285288380","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06900485,0.0017826455,0.91490936,0.0007716363,0.00032418288,0.000063837644,0.0012651196,0.0030520102,0.008826351],"genre_scores_gemma":[0.92302316,0.00084262295,0.05917601,0.0002707162,0.00009441696,0.00015362936,0.00135678,0.000118327625,0.014964379],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998373,0.000021493857,0.000010565496,0.00006204832,0.000035773304,0.000032754753],"domain_scores_gemma":[0.9998852,0.000030842875,0.000017962015,0.000013413918,0.00004488639,0.0000075775556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039940266,0.0008028284,0.00061161333,0.000357259,0.00026920054,0.000642552,0.0013566893,0.0007936149,0.0027957095],"category_scores_gemma":[0.00057916687,0.00033173373,0.00064237445,0.0006285938,0.00029330852,0.0010303692,0.0005539704,0.0013556494,0.00075911987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016171641,0.000092119335,0.0016209371,0.0000823918,0.00008431784,0.00010943701,0.000047336198,0.8940699,0.0040848716,0.0075706863,0.003796616,0.08827967],"study_design_scores_gemma":[0.0000025415388,0.000007989931,0.00010901021,0.0000021484234,0.0000057407074,0.0000060839866,0.0000017276094,0.99802715,0.0002864058,0.0012270054,0.0003214915,0.0000026599357],"about_ca_topic_score_codex":0.015626974,"about_ca_topic_score_gemma":0.020208908,"teacher_disagreement_score":0.015626974,"about_ca_system_score_codex":0.0006696188,"about_ca_system_score_gemma":0.0008914044,"threshold_uncertainty_score":0.03107202},"labels":[],"label_agreement":null},{"id":"W4285308691","doi":"10.2139/ssrn.4118206","title":"Multi-Agent Reinforcement Mechanism Design for Dynamic Pricing-Based Demand Response in a Smart Charging Network","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Mechanism (biology); Dynamic pricing; Mechanism design; Reinforcement; Reinforcement learning; Demand response; Computer science; Microeconomics; Economics; Engineering; Artificial intelligence; Structural engineering; Electrical engineering","score_opus":0.010641016813104706,"score_gpt":0.21689124900265264,"score_spread":0.20625023218954794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285308691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043963354,0.0001366627,0.9511643,0.0002492921,0.00006334536,0.00011521056,0.000025924044,0.00020541051,0.0040763975],"genre_scores_gemma":[0.9796948,0.0000496854,0.018725324,0.00003838061,0.000014549893,0.00008242188,0.000012751544,0.000013937546,0.0013681384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999278,0.00029930955,0.00003253537,0.00012511275,0.0001257092,0.0001393591],"domain_scores_gemma":[0.99866366,0.0006174703,0.00022476423,0.0000606822,0.0003109515,0.00012248955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019200881,0.00067474204,0.0011496695,0.00043724937,0.0005411392,0.0011805502,0.0017613255,0.0011350693,0.002506053],"category_scores_gemma":[0.002808776,0.00046561254,0.00045718867,0.0003361675,0.0007241605,0.0008126399,0.0010825997,0.0009351105,0.00024346997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009918124,0.000068893605,0.00023652823,0.000039602623,0.000030664934,0.00007845066,0.00003559115,0.9823324,0.0017052403,0.0061164843,0.0003513327,0.008905565],"study_design_scores_gemma":[0.000008754362,0.000020716567,0.000021408394,0.0000010609749,0.0000041494345,0.0000057643374,0.0000030177443,0.9992561,0.00008936794,0.0005289724,0.0000588382,0.0000018357143],"about_ca_topic_score_codex":0.0038759194,"about_ca_topic_score_gemma":0.003063395,"teacher_disagreement_score":0.0038759194,"about_ca_system_score_codex":0.0009420355,"about_ca_system_score_gemma":0.0010620443,"threshold_uncertainty_score":0.010154545},"labels":[],"label_agreement":null},{"id":"W4286744516","doi":"10.2139/ssrn.4170050","title":"Pricing Strategy for Household Energy-Saving Option (Heso): A Novel Option-Based Intervention for Promoting Household Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Energy (signal processing); Intervention (counseling); Economics; Business; Environmental economics; Microeconomics; Public economics; Medicine","score_opus":0.016594247317318032,"score_gpt":0.21708673868845277,"score_spread":0.20049249137113473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286744516","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47282246,0.00038302303,0.47400647,0.0015842256,0.0003335511,0.00042292516,0.00013011758,0.00079225935,0.049524978],"genre_scores_gemma":[0.9787375,0.000054042142,0.016683277,0.0000883173,0.00002462976,0.00005012028,0.000016613425,0.00001326091,0.0043323915],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976796,0.00010172643,0.000008938776,0.00003655093,0.00005428934,0.000030543055],"domain_scores_gemma":[0.9996941,0.00016058295,0.00003346301,0.000022562324,0.00004199845,0.000047354875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003926501,0.00035903856,0.00035080177,0.00020272912,0.0002553692,0.0005732359,0.00066105736,0.00069139985,0.011090256],"category_scores_gemma":[0.0014325448,0.000084586354,0.00021360285,0.00018011197,0.00025386867,0.0008600529,0.00057614036,0.00059529353,0.0005007097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031056984,0.0054677418,0.0055382987,0.00038199537,0.000140571,0.0011205737,0.00065206306,0.0930234,0.05156102,0.18905564,0.010277105,0.6396759],"study_design_scores_gemma":[0.00036917013,0.0019367859,0.0053469357,0.00005499656,0.00013645572,0.00039595866,0.00044503628,0.89980745,0.013312082,0.068353206,0.009758205,0.00008365605],"about_ca_topic_score_codex":0.00031734418,"about_ca_topic_score_gemma":0.00041369174,"teacher_disagreement_score":0.011090256,"about_ca_system_score_codex":0.00017467486,"about_ca_system_score_gemma":0.00027725432,"threshold_uncertainty_score":0.037100554},"labels":[],"label_agreement":null},{"id":"W4287558439","doi":"10.48550/arxiv.2012.01013","title":"Optimal Dynamic Pricing for Binary Demands in Smart Grids: A Fair and\\n Privacy-Preserving Strategy","year":2020,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Binary number; Markov chain; Operator (biology); Population; Smart grid; Markov process; Operations research; Distributed computing; Mathematics; Engineering","score_opus":0.05005840912993398,"score_gpt":0.18928077571534416,"score_spread":0.13922236658541018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4287558439","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062432677,0.00027311218,0.92633224,0.0013205917,0.00008674856,0.00010226471,0.00014160619,0.00020764463,0.009103166],"genre_scores_gemma":[0.9546789,0.000215134,0.04073758,0.00017224463,0.000050736508,0.00006808949,0.00006675017,0.000040665847,0.003969872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897385,0.00046430348,0.00003221712,0.00015046753,0.0001735851,0.00020553319],"domain_scores_gemma":[0.9981055,0.0012727482,0.00016197635,0.00015439863,0.00013919332,0.00016611238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019482068,0.00084871455,0.0011968206,0.00037302065,0.00067699776,0.0019020406,0.0012727616,0.0015950265,0.0030942792],"category_scores_gemma":[0.0041546887,0.00047648707,0.00077484443,0.00061941374,0.0018079738,0.0023273085,0.0016279481,0.0015459483,0.00030167663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000229284,0.00008686768,0.00045574876,0.000060617396,0.000034144832,0.00015400066,0.00010913037,0.85980374,0.0015742125,0.12271233,0.0022785624,0.012501344],"study_design_scores_gemma":[0.000015555634,0.000018824885,0.00003998881,0.0000040230916,0.000003970295,0.000014159501,0.000015506237,0.9708765,0.00019900694,0.028512018,0.00029451065,0.000005873628],"about_ca_topic_score_codex":0.0038019721,"about_ca_topic_score_gemma":0.002794843,"teacher_disagreement_score":0.0038019721,"about_ca_system_score_codex":0.0019519095,"about_ca_system_score_gemma":0.001970528,"threshold_uncertainty_score":0.014162123},"labels":[],"label_agreement":null},{"id":"W4288059691","doi":"10.1049/icp.2022.0881","title":"Euniversal's smart grid solutions for the coordinated operation &amp; planning of MV and LV networks with high EV integration","year":2022,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Flexibility (engineering); Smart grid; Grid; Computer science; Electricity; Systems engineering; Distributed computing; Engineering; Electrical engineering","score_opus":0.023114062586090237,"score_gpt":0.20503768968467706,"score_spread":0.18192362709858684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288059691","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041763198,0.0014239143,0.8685016,0.001370337,0.0002885919,0.0005961133,0.0056910315,0.012459606,0.06790564],"genre_scores_gemma":[0.3831953,0.001300384,0.5742168,0.00020969778,0.00004905586,0.00060202874,0.014021915,0.0011646576,0.02524011],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994955,0.00015313768,0.000023641498,0.00008358689,0.00015936149,0.00008481457],"domain_scores_gemma":[0.99950254,0.00009917771,0.00006804563,0.0001162694,0.00014386109,0.00007015135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014010045,0.0010470125,0.0004249148,0.00086922874,0.00033481664,0.0015231726,0.0009778925,0.0010793251,0.008714828],"category_scores_gemma":[0.0011269174,0.00035535934,0.00065927114,0.0008338073,0.00029820143,0.001405984,0.0013273282,0.00071136694,0.0020234808],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074823474,0.00030810083,0.0063286144,0.0008302124,0.0001491475,0.0007167495,0.0005168702,0.19795139,0.03092985,0.10765065,0.0613983,0.5924718],"study_design_scores_gemma":[0.000374552,0.0006071099,0.0052117743,0.00032784924,0.00009155965,0.00052456575,0.00035602073,0.54706097,0.037434954,0.023898756,0.38402572,0.00008611861],"about_ca_topic_score_codex":0.004993582,"about_ca_topic_score_gemma":0.006508776,"teacher_disagreement_score":0.008714828,"about_ca_system_score_codex":0.00090014597,"about_ca_system_score_gemma":0.0020354765,"threshold_uncertainty_score":0.029154003},"labels":[],"label_agreement":null},{"id":"W4288280370","doi":"10.48550/arxiv.1907.12370","title":"Design and Field Implementation of Blockchain Based Renewable Energy\\n Trading in Residential Communities","year":2019,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blockchain; Microgrid; Smart contract; Clearing; Renewable energy; Environmental economics; Single point of failure; Peer-to-peer; Computer science; Electricity; Computer security; Demand response; Prosumer; Business; Vulnerability (computing); Smart grid; Economics; Distributed computing; Finance; Engineering","score_opus":0.04682875399287724,"score_gpt":0.1825433446431771,"score_spread":0.13571459065029984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288280370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30159375,0.00018243397,0.6581638,0.00046068,0.00009116929,0.0016375624,0.00015302296,0.0033916472,0.034325976],"genre_scores_gemma":[0.9076745,0.00006254158,0.08582103,0.000049802282,0.000007834875,0.00028236554,0.000076242664,0.000049385788,0.005976439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994368,0.00015357019,0.000023200297,0.00008420692,0.0002120421,0.00009012175],"domain_scores_gemma":[0.99930024,0.00012888933,0.00006093912,0.00014854608,0.0002198394,0.00014150095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065320364,0.00026344095,0.0002554101,0.0002678812,0.0006546492,0.00079965603,0.001473275,0.0006579505,0.004489237],"category_scores_gemma":[0.0010027613,0.00020951059,0.00013440617,0.00024671297,0.00053125946,0.0010431012,0.0010219251,0.00045952268,0.00083946233],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013935745,0.0020603407,0.011783122,0.0005728632,0.00007129557,0.0015740207,0.001149374,0.39385933,0.17076603,0.05711504,0.0057992144,0.35385588],"study_design_scores_gemma":[0.00020206063,0.0009331835,0.0011910343,0.00002389191,0.00002026213,0.000215567,0.00019690517,0.93700534,0.040029332,0.0056949593,0.014455697,0.00003173633],"about_ca_topic_score_codex":0.0028896993,"about_ca_topic_score_gemma":0.0031905337,"teacher_disagreement_score":0.004489237,"about_ca_system_score_codex":0.00070564187,"about_ca_system_score_gemma":0.0016354307,"threshold_uncertainty_score":0.015017986},"labels":[],"label_agreement":null},{"id":"W4288282611","doi":"10.48550/arxiv.1907.06299","title":"Universal Non-Intrusive Load Monitoring (UNILM) Using Filter Pipelines,\\n Probabilistic Knapsack, and Labelled Partition Maps","year":2019,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Knapsack problem; Partition (number theory); Probabilistic logic; Computer science; Energy consumption; Pipeline (software); Pipeline transport; Filter (signal processing); Aggregate (composite); Real-time computing; Energy (signal processing); Gaussian; Data mining; Artificial intelligence; Engineering; Algorithm; Statistics; Mathematics; Computer vision","score_opus":0.05120176735673651,"score_gpt":0.17666171238915057,"score_spread":0.12545994503241406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288282611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020029653,0.000086618165,0.9748994,0.000050741946,0.000026239557,0.00006216061,0.00014764446,0.003928941,0.00076854025],"genre_scores_gemma":[0.5066064,0.00011791784,0.48803866,0.00009803237,0.000044880948,0.0001806991,0.0010584064,0.00032705796,0.003528028],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903524,0.00017503022,0.000047378395,0.00034686402,0.00024501502,0.00015051282],"domain_scores_gemma":[0.9987103,0.00047627985,0.00020427186,0.00031635712,0.00022168744,0.00007114678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011010629,0.0014195667,0.0009352637,0.0010150945,0.00071401306,0.0013663931,0.0015635481,0.0006859233,0.0021111257],"category_scores_gemma":[0.002585884,0.0005762933,0.0008181768,0.0015071471,0.00082759594,0.0024621636,0.0016238781,0.0010046805,0.00087064947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096760725,0.0004259986,0.0056960434,0.00020766167,0.00018703422,0.00013092281,0.00031657997,0.4078788,0.017966399,0.00974105,0.0046026786,0.5518792],"study_design_scores_gemma":[0.00000996774,0.00006443993,0.001001129,0.000005567812,0.000011263079,0.000024089459,0.000028840273,0.9853865,0.008098443,0.004348877,0.001002876,0.000017960454],"about_ca_topic_score_codex":0.018894266,"about_ca_topic_score_gemma":0.025489328,"teacher_disagreement_score":0.018894266,"about_ca_system_score_codex":0.0014387285,"about_ca_system_score_gemma":0.0013585052,"threshold_uncertainty_score":0.03756857},"labels":[],"label_agreement":null},{"id":"W4288391536","doi":"10.1109/tsg.2022.3194815","title":"Electricity Consumption Optimization Using Thermal and Battery Energy Storage Systems in Buildings","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Particle swarm optimization; Schedule; Energy storage; Mathematical optimization; Peaking power plant; Computer science; Robustness (evolution); Energy consumption; Load profile; Optimization problem; Reliability engineering; Electricity; Automotive engineering; Power (physics); Engineering; Electrical engineering; Renewable energy; Distributed generation; Mathematics","score_opus":0.013813346743712,"score_gpt":0.1979869916000344,"score_spread":0.1841736448563224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288391536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2658776,0.0021278132,0.71255904,0.0003924834,0.00007265831,0.00007466934,0.00016235089,0.00031139652,0.018422054],"genre_scores_gemma":[0.98069096,0.0003817168,0.016537901,0.000022711643,0.000009555737,0.000035402947,0.00004232033,0.000018566338,0.0022609017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998429,0.0000625836,0.0000067361516,0.000025230509,0.000038323153,0.000024085339],"domain_scores_gemma":[0.99992466,0.00003833828,0.00001274449,0.000005079047,0.00001291229,0.0000063066454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031914,0.0005050797,0.0006147751,0.0002913095,0.0002609678,0.00081127736,0.00031553826,0.00045966552,0.0009601064],"category_scores_gemma":[0.00039574076,0.00034712136,0.00042482853,0.00060902484,0.00031564297,0.0005563704,0.0003732072,0.00029505245,0.00011818396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015778007,0.000009415542,0.00016695226,0.000014440186,0.0000126092555,0.000017323991,0.000005935211,0.99336445,0.0005541735,0.0012519013,0.000100636375,0.0044863727],"study_design_scores_gemma":[0.0000026626712,0.0000107379155,0.0001075198,0.0000012238672,0.0000038130534,0.0000036030751,0.0000047777485,0.9989411,0.00015403777,0.0006567103,0.000112169655,0.0000016211766],"about_ca_topic_score_codex":0.007192038,"about_ca_topic_score_gemma":0.007718617,"teacher_disagreement_score":0.007192038,"about_ca_system_score_codex":0.00068373035,"about_ca_system_score_gemma":0.0006332168,"threshold_uncertainty_score":0.014300346},"labels":[],"label_agreement":null},{"id":"W4288562897","doi":"10.48550/arxiv.1902.08736","title":"Wavenilm: A causal neural network for power disaggregation from the\\n complex power signal","year":2019,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power (physics); Convolutional neural network; Artificial neural network; Convergence (economics); Aggregate (composite); AC power; SIGNAL (programming language); Artificial intelligence; Machine learning","score_opus":0.049656689993903005,"score_gpt":0.17061923277842808,"score_spread":0.12096254278452508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288562897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07318243,0.0013934909,0.89015186,0.0009849787,0.00044689706,0.00010702438,0.0054286527,0.019132346,0.009172196],"genre_scores_gemma":[0.652271,0.0008441563,0.31604308,0.00051624933,0.00017451313,0.00015950178,0.011911729,0.0006253854,0.017454479],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990916,0.000013866264,0.0000042792376,0.00003020352,0.000026789272,0.000015644533],"domain_scores_gemma":[0.99986947,0.000044390512,0.000018632201,0.000030564865,0.000026413973,0.000010460692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002615918,0.0008294584,0.0003546432,0.00057984685,0.00027927803,0.0005299839,0.0011615062,0.0006947056,0.0039231144],"category_scores_gemma":[0.0010893657,0.00032379283,0.00039394735,0.00070291996,0.00023947807,0.0008440265,0.00073748094,0.001128746,0.0007849326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023381201,0.00017210508,0.0033339157,0.00015987844,0.00016410578,0.00019287513,0.00005134736,0.5692695,0.0055616633,0.007205991,0.030818885,0.3828359],"study_design_scores_gemma":[0.000006850303,0.000010334864,0.00034713678,0.0000044036196,0.0000053505523,0.000012118165,0.0000039136958,0.99474066,0.0013677683,0.0018848722,0.001611943,0.000004785969],"about_ca_topic_score_codex":0.014646805,"about_ca_topic_score_gemma":0.032943364,"teacher_disagreement_score":0.014646805,"about_ca_system_score_codex":0.0006910556,"about_ca_system_score_gemma":0.00071895035,"threshold_uncertainty_score":0.029123068},"labels":[],"label_agreement":null},{"id":"W4289836703","doi":"10.1016/j.renene.2022.07.055","title":"A genetic algorithm optimization approach for smart energy management of microgrids","year":2022,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":150,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Schedule; Demand response; Reservation; Genetic algorithm; Renewable energy; Computer science; Mathematical optimization; Energy management; Minification; Greenhouse gas; Environmental economics; Electricity generation; Reliability engineering; Operations research; Electricity; Engineering; Power (physics); Energy (signal processing); Economics","score_opus":0.006304266835687067,"score_gpt":0.17309282103603882,"score_spread":0.16678855420035174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4289836703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009466471,0.00039775055,0.98052716,0.00027752164,0.00010106995,0.000058647063,0.000038524566,0.00015982053,0.008972992],"genre_scores_gemma":[0.5576666,0.0008848247,0.4300334,0.00027985225,0.00017131938,0.00033219333,0.00015181095,0.00013365659,0.010346326],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999782,0.000089708454,0.0000070563447,0.00002640061,0.00007152659,0.000023365052],"domain_scores_gemma":[0.9997981,0.00011181444,0.000016740534,0.00001086729,0.00005188011,0.000010742374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051908585,0.00065943925,0.00075151946,0.00053762726,0.0004440452,0.0008366283,0.00090073585,0.0012178168,0.0027124677],"category_scores_gemma":[0.0011981626,0.000339262,0.0006181508,0.0008145704,0.00045903627,0.0005599676,0.00062430993,0.0008699019,0.00036057268],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008572799,0.000013286246,0.00006966762,0.000011957811,0.000015202425,0.000013992955,0.000008767582,0.9819869,0.00021574112,0.004540197,0.0003950383,0.01272065],"study_design_scores_gemma":[0.0000038545472,0.0000072665657,0.00001997078,0.0000024987187,0.0000029984592,0.000003167125,0.0000024097892,0.9981888,0.00004302997,0.0014613667,0.00026332118,0.0000012687063],"about_ca_topic_score_codex":0.008703733,"about_ca_topic_score_gemma":0.007054891,"teacher_disagreement_score":0.008703733,"about_ca_system_score_codex":0.0006153924,"about_ca_system_score_gemma":0.0011006623,"threshold_uncertainty_score":0.017306149},"labels":[],"label_agreement":null},{"id":"W4289928588","doi":"10.1016/j.buildenv.2022.109461","title":"Ten questions concerning energy flexibility in buildings","year":2022,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Lawrence Berkeley National Laboratory; Office of Energy Efficiency; Building Technologies Office; Energistyrelsen; Natural Sciences and Engineering Research Council of Canada; Energiteknologisk udviklings- og demonstrationsprogram; Norges Forskningsråd; Agència de Gestió d'Ajuts Universitaris i de Recerca; Generalitat de Catalunya; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; European Commission; Fundação para a Ciência e a Tecnologia; Innovationsfonden","keywords":"Flexibility (engineering); Renewable energy; Energy engineering; Environmental economics; Software deployment; Energy transition; Energy supply; Resilience (materials science); Distributed generation; Energy consumption; Architectural engineering; Risk analysis (engineering); Engineering; Business; Energy (signal processing); Economics; Electrical engineering","score_opus":0.010277909188226596,"score_gpt":0.19352535689621453,"score_spread":0.18324744770798793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4289928588","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06326127,0.05059508,0.15168975,0.39082417,0.0023861816,0.00025607648,0.00037517236,0.00016256454,0.3404497],"genre_scores_gemma":[0.9095661,0.026180366,0.02809086,0.020808026,0.0027412775,0.00038167313,0.00015682456,0.0000777198,0.011997246],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9924717,0.0039951103,0.00035839237,0.0007005408,0.001986388,0.00048794076],"domain_scores_gemma":[0.9804945,0.01608799,0.00081352255,0.00095224055,0.0012438108,0.00040800276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0111207655,0.0006757215,0.0006068104,0.0019393547,0.0028376428,0.009394746,0.0018768008,0.0074542128,0.005768453],"category_scores_gemma":[0.016994411,0.0003517324,0.00068477273,0.0030310077,0.040286697,0.018051168,0.004096395,0.006810521,0.000628891],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000080705495,0.00000859958,0.00018908834,0.00005531069,0.0000017249309,0.00003542373,0.0009233063,0.0006342924,0.000048544996,0.9887705,0.0012207704,0.008104376],"study_design_scores_gemma":[0.0000037432926,0.000011840403,0.00021832288,0.00021059153,0.0000014270469,0.000059283997,0.0026655397,0.0008722993,0.000103143866,0.9711387,0.024700532,0.000014650635],"about_ca_topic_score_codex":0.0024567586,"about_ca_topic_score_gemma":0.0015654266,"teacher_disagreement_score":0.0111207655,"about_ca_system_score_codex":0.004974824,"about_ca_system_score_gemma":0.002914069,"threshold_uncertainty_score":0.058812916},"labels":[],"label_agreement":null},{"id":"W4292071342","doi":"10.23919/ecc55457.2022.9838103","title":"Exact convergence to GNE using penalty methods","year":2022,"lang":"en","type":"article","venue":"2022 European Control Conference (ECC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Convergence (economics); Penalty method; Nash equilibrium; Mathematical optimization; Constraint (computer-aided design); Computer science; Function (biology); Best response; Game theory; Equilibrium point; Class (philosophy); Control theory (sociology); Mathematics; Mathematical economics; Control (management)","score_opus":0.030780909714290032,"score_gpt":0.27080365606023776,"score_spread":0.24002274634594772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292071342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006930248,0.000083618106,0.9898413,0.00014041564,0.00002671744,0.000024649811,0.000014585321,0.00012327784,0.0028152096],"genre_scores_gemma":[0.60960764,0.00023962124,0.3795552,0.00019739966,0.00005151305,0.00030237925,0.00014466784,0.0003246393,0.00957696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993765,0.0002837996,0.000020424317,0.00008537608,0.00016461615,0.000069371476],"domain_scores_gemma":[0.99790406,0.0014085813,0.00015775864,0.00015998643,0.00027048314,0.00009908115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017421551,0.001263261,0.00092137704,0.00065965136,0.0004502061,0.00084082724,0.00090970146,0.001151092,0.0031450642],"category_scores_gemma":[0.006608533,0.00039473738,0.0004350284,0.00037939975,0.0014588563,0.0011251174,0.0020883658,0.0015836352,0.00054671115],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043349835,0.000018562176,0.0002241766,0.000052894557,0.000013375699,0.000043020977,0.00004222679,0.9615621,0.0008291392,0.024483195,0.0004848354,0.012203182],"study_design_scores_gemma":[0.0000026720957,0.0000056203894,0.000013081887,0.000002734302,4.4559138e-7,0.000004361404,0.0000028280451,0.9959046,0.00010167417,0.0038002941,0.00016003833,0.0000016050433],"about_ca_topic_score_codex":0.004594365,"about_ca_topic_score_gemma":0.0039469716,"teacher_disagreement_score":0.004594365,"about_ca_system_score_codex":0.00080959575,"about_ca_system_score_gemma":0.001112953,"threshold_uncertainty_score":0.010521293},"labels":[],"label_agreement":null},{"id":"W4292259914","doi":"10.3389/fenrg.2022.962361","title":"An evaluation of domestic electric water heaters for frequency control","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"National Natural Science Foundation of China; Education Department of Hunan Province","keywords":"Automatic frequency control; Electric power system; Automotive engineering; Demand response; Electric power; Engineering; Power (physics); Control (management); Computer science; Control theory (sociology); Electrical engineering; Electricity","score_opus":0.02899259173603643,"score_gpt":0.30787260716763454,"score_spread":0.2788800154315981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292259914","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96032876,0.0010323009,0.026559966,0.00013086564,0.00007859666,0.00017122547,0.00019869854,0.00038145226,0.011118026],"genre_scores_gemma":[0.9973713,0.000111082,0.0016722364,0.0000042086426,0.000003938161,0.000011420741,0.000059894075,0.000007952581,0.00075793004],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994597,0.00016804796,0.000025732703,0.00007237882,0.00022391026,0.000050274433],"domain_scores_gemma":[0.99882144,0.0005043597,0.000075341144,0.0001105936,0.00042405212,0.00006420903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00100087,0.0005022489,0.00039159055,0.0007574676,0.00027497168,0.00071074994,0.0005439548,0.00038955835,0.0024899228],"category_scores_gemma":[0.002547004,0.00010838628,0.00027210065,0.0005528076,0.000261904,0.00091011333,0.00032189593,0.00024317605,0.00026380815],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0051832544,0.0011596704,0.03341434,0.0018987097,0.00018829503,0.00077901414,0.0004499587,0.3266964,0.116266035,0.007160976,0.004734209,0.5020692],"study_design_scores_gemma":[0.0002108064,0.0049053915,0.047792334,0.00007728701,0.00023644956,0.0002214176,0.0010334558,0.84485775,0.089326754,0.0012263643,0.010040647,0.00007129615],"about_ca_topic_score_codex":0.0037379179,"about_ca_topic_score_gemma":0.0035037482,"teacher_disagreement_score":0.0037379179,"about_ca_system_score_codex":0.000815912,"about_ca_system_score_gemma":0.00030380208,"threshold_uncertainty_score":0.00832963},"labels":[],"label_agreement":null},{"id":"W4294531397","doi":"10.26868/25222708.2017.602","title":"Predictive Setpoint Optimization of a Commercial Building Subject to a Winter Demand Penalty Affecting 12 Months of Utility Bills","year":2017,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Setpoint; Model predictive control; Electricity; Predictive power; Minification; Computer science; Time horizon; Peak demand; Environmental science; Control (management); Mathematical optimization; Econometrics; Engineering; Economics; Mathematics; Electrical engineering","score_opus":0.026869474144271908,"score_gpt":0.2777872951387119,"score_spread":0.25091782099444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294531397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8619572,0.00019894833,0.120639354,0.00033419678,0.00004210485,0.00007973905,0.00031063895,0.00039162344,0.016046185],"genre_scores_gemma":[0.9972253,0.000017899938,0.0016600941,0.0000075824914,0.0000017338836,0.000015335178,0.00004291082,0.0000084956655,0.0010205398],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999082,0.000023919876,0.000002765678,0.00001746641,0.000016211088,0.00003139573],"domain_scores_gemma":[0.99976796,0.00013913242,0.00002288813,0.000012223778,0.000039167564,0.000018646751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034837518,0.0005926238,0.0005244394,0.00019577566,0.00033457126,0.000609956,0.00042172868,0.00058476883,0.0025936796],"category_scores_gemma":[0.0006451529,0.00027501967,0.00034067204,0.0002843376,0.00040571415,0.00021973622,0.00038159062,0.00055944186,0.00012946395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041714637,0.00001601007,0.00015029711,0.000008862166,0.0000046613522,0.000020022135,0.0000065765194,0.997497,0.00048266465,0.00024733105,0.000086468535,0.0014384359],"study_design_scores_gemma":[0.000008122699,0.000023800285,0.00021219479,8.410168e-7,0.000002774534,0.0000018562914,0.0000070605024,0.99933654,0.00025116367,0.00010134234,0.00005284304,0.000001405355],"about_ca_topic_score_codex":0.069883764,"about_ca_topic_score_gemma":0.046829022,"teacher_disagreement_score":0.069883764,"about_ca_system_score_codex":0.0010599818,"about_ca_system_score_gemma":0.0010667898,"threshold_uncertainty_score":0.13895398},"labels":[],"label_agreement":null},{"id":"W4294591092","doi":"10.1016/j.ijepes.2022.108550","title":"Blockchain-based sequential market-clearing platform for enabling energy trading in Interconnected Microgrids","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Market clearing; Context (archaeology); Energy market; Clearing; Modularity (biology); Blockchain; Order (exchange); Computer science; Microgrid; Resilience (materials science); Ranking (information retrieval); Distributed generation; Demand response; Distributed computing; Operations research; Risk analysis (engineering); Computer security; Economics; Business; Engineering; Microeconomics; Electricity; Renewable energy; Artificial intelligence; Control (management); Electrical engineering","score_opus":0.010843840530583475,"score_gpt":0.21698409574461103,"score_spread":0.20614025521402754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294591092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13008554,0.0004573282,0.8464302,0.00052034744,0.0001890824,0.0006516084,0.00034620395,0.00242261,0.018897023],"genre_scores_gemma":[0.9579289,0.00016304973,0.037923157,0.000063318,0.000024109933,0.00022316798,0.00017949674,0.000027908702,0.0034669586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993761,0.00017723646,0.000041601663,0.00010635369,0.00017377957,0.00012486494],"domain_scores_gemma":[0.9990345,0.00034411228,0.00012587373,0.00016452327,0.00018154639,0.00014947448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008216118,0.00043212142,0.00067905773,0.00034426223,0.00078800455,0.0010405877,0.0010475048,0.00067667686,0.0052246316],"category_scores_gemma":[0.0017942514,0.00023955115,0.00027158437,0.00044426855,0.0006872284,0.0013679581,0.0015630629,0.0007266482,0.00085179566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083651644,0.00033040074,0.0017791041,0.00027403203,0.00006752537,0.0008643845,0.00028704127,0.8169949,0.018900467,0.05810683,0.0042770086,0.09728181],"study_design_scores_gemma":[0.00007942807,0.00011016407,0.0001389166,0.000009934841,0.0000094095185,0.000052870906,0.000025202295,0.9811746,0.0022942936,0.013057901,0.0030361195,0.000011232447],"about_ca_topic_score_codex":0.0023475406,"about_ca_topic_score_gemma":0.0039985706,"teacher_disagreement_score":0.0052246316,"about_ca_system_score_codex":0.00055131747,"about_ca_system_score_gemma":0.0018265131,"threshold_uncertainty_score":0.017478168},"labels":[],"label_agreement":null},{"id":"W4294952288","doi":"10.3390/s22186733","title":"Low-Cost, Open-Source, Emoncms-Based SCADA System for a Large Grid-Connected PV System","year":2022,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"SCADA; Arduino; Dashboard; Embedded system; JSON; Open source hardware; Data logger; Operating system; Photovoltaic system; Modbus; Computer science; Open source; Computer hardware; Data acquisition; Database; Software; Real-time computing; Engineering; Electrical engineering","score_opus":0.010403424005711249,"score_gpt":0.2077582614921857,"score_spread":0.19735483748647445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294952288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17053266,0.00032037188,0.72464883,0.00030951988,0.00015768301,0.0008440224,0.0013106791,0.0728626,0.02901364],"genre_scores_gemma":[0.8253763,0.00013511242,0.15267201,0.00018100276,0.00007959046,0.00055518793,0.0014844519,0.0009875797,0.01852866],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994624,0.00008701716,0.000038036666,0.00012256276,0.00025758936,0.000032461467],"domain_scores_gemma":[0.99957913,0.00004734717,0.00004635936,0.00010793367,0.00018165783,0.000037598205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036196306,0.0006023834,0.00041676773,0.0005447758,0.00034829832,0.00048756003,0.0008519625,0.0003511434,0.0070114173],"category_scores_gemma":[0.0007928518,0.00021021315,0.0001796564,0.00037117483,0.00018030406,0.0006611014,0.0004767974,0.00033287643,0.0030569998],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001092969,0.0005985921,0.009612047,0.0005653838,0.00009210829,0.0015702008,0.000779338,0.020009292,0.31996223,0.0051464187,0.060424548,0.58014697],"study_design_scores_gemma":[0.000415376,0.0015070991,0.03882303,0.00018486807,0.0002372591,0.0018982042,0.00019849553,0.43144196,0.25570965,0.002394158,0.26697063,0.00021934134],"about_ca_topic_score_codex":0.0013796831,"about_ca_topic_score_gemma":0.0018802269,"teacher_disagreement_score":0.0070114173,"about_ca_system_score_codex":0.00053546985,"about_ca_system_score_gemma":0.000506691,"threshold_uncertainty_score":0.0234555},"labels":[],"label_agreement":null},{"id":"W4294991992","doi":"10.21203/rs.3.rs-2032037/v1","title":"Minimization of Environmental Emission and cost of generation by using economic load dispatch","year":2022,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Particle swarm optimization; Thermal power station; Electricity generation; Minification; Economic dispatch; Context (archaeology); Work (physics); Power station; Electric power system; Electrical load; Power (physics); Coal; Computer science; Economic cost; Base load power plant; Environmental economics; Environmental science; Engineering; Waste management; Economics; Electrical engineering; Mechanical engineering; Microeconomics","score_opus":0.038812834735124035,"score_gpt":0.30728956171358723,"score_spread":0.2684767269784632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294991992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20000014,0.00080604444,0.76430756,0.00092616375,0.0001419074,0.00017099529,0.00022229477,0.00014626756,0.03327861],"genre_scores_gemma":[0.9736887,0.00017624177,0.022705056,0.000019643281,0.00002172133,0.000045232126,0.000047335096,0.000030240222,0.0032658726],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964464,0.00018027419,0.000010658766,0.00003275481,0.00009287733,0.00003887349],"domain_scores_gemma":[0.9995441,0.00027253258,0.000052402804,0.000026899073,0.00007677653,0.000027234482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006982826,0.0004989252,0.00055133086,0.00057016785,0.0002628842,0.0010465347,0.00041239653,0.00042324417,0.0021962486],"category_scores_gemma":[0.0014376884,0.00018765654,0.00031690154,0.00062784174,0.00027721043,0.0009854176,0.00033373758,0.00043198158,0.00016362096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064047985,0.00004115526,0.0003504777,0.000051611696,0.000020275525,0.000031712552,0.00001023008,0.9711384,0.0011360975,0.010186934,0.0005285945,0.016440446],"study_design_scores_gemma":[0.0000079427655,0.000025353082,0.00024229035,0.000003954351,0.000007249807,0.000007566336,0.000014202068,0.99439853,0.00069889275,0.004044061,0.0005457611,0.000004134504],"about_ca_topic_score_codex":0.002011009,"about_ca_topic_score_gemma":0.0020535355,"teacher_disagreement_score":0.0021962486,"about_ca_system_score_codex":0.001153781,"about_ca_system_score_gemma":0.0006520691,"threshold_uncertainty_score":0.008371294},"labels":[],"label_agreement":null},{"id":"W4295214488","doi":"","title":"Optimal Subhourly Electricity Resource Dispatch Under Multiple Price Signals With High Renewable Generation Resource Availability","year":2019,"lang":"en","type":"other","venue":"OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"SLAC National Accelerator Laboratory; Office of Science; U.S. Department of Energy; Pacific Institute for Climate Solutions; University of Victoria; California Energy Commission","keywords":"Electricity; Renewable energy; Environmental economics; Resource (disambiguation); Economic dispatch; Renewable resource; Computer science; Electricity generation; Business; Natural resource economics; Operations research; Economics; Electric power system; Engineering; Electrical engineering; Power (physics); Computer network","score_opus":0.009124887534679927,"score_gpt":0.1903780951543542,"score_spread":0.18125320761967426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4295214488","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5950565,0.0012203727,0.36214948,0.0021676002,0.00056872616,0.00021310113,0.0014804188,0.0011689386,0.0359749],"genre_scores_gemma":[0.98973644,0.00007596094,0.007592893,0.000046255653,0.0000426567,0.000018634139,0.000104635925,0.00003190394,0.0023506796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995265,0.00017428957,0.000017666258,0.000075219745,0.00007245591,0.00013396586],"domain_scores_gemma":[0.99878675,0.000748745,0.00018015008,0.00003511217,0.00010316675,0.00014618954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086015987,0.00090393896,0.0014585374,0.00045771847,0.0003449928,0.0013687916,0.0006707793,0.00082264224,0.003336977],"category_scores_gemma":[0.001707652,0.0005555233,0.0002636648,0.00049863354,0.0003952107,0.00085441436,0.0005081754,0.00090849394,0.00037947713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029097768,0.000047592443,0.00022646804,0.000036243902,0.000025501357,0.000089840134,0.00001685331,0.9868968,0.0011353554,0.002297802,0.0017629091,0.007173789],"study_design_scores_gemma":[0.000014162766,0.000025858284,0.00014496628,0.0000011363123,0.0000034744573,0.0000050421227,0.000008590561,0.99899155,0.00008799873,0.0006466701,0.00006735627,0.0000031294505],"about_ca_topic_score_codex":0.0101339985,"about_ca_topic_score_gemma":0.013400021,"teacher_disagreement_score":0.0101339985,"about_ca_system_score_codex":0.0012100228,"about_ca_system_score_gemma":0.0013305506,"threshold_uncertainty_score":0.020150065},"labels":[],"label_agreement":null},{"id":"W4296755542","doi":"10.55299/jostec.v3i1.55","title":"PLTS Design for Big Industry Needs","year":2021,"lang":"en","type":"article","venue":"Journal of Science Technology (JoSTec)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Renewable energy; Solar energy; Software; Grid parity; Electric power; Environmental science; Solar cell; Engineering; Grid; Solar power; Automotive engineering; Electrical engineering; Process engineering; Photovoltaics; Computer science; Power (physics)","score_opus":0.02640855556328935,"score_gpt":0.238346219623226,"score_spread":0.21193766405993664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296755542","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15495461,0.00034653555,0.5686806,0.0015220842,0.00033919804,0.0010355641,0.0011905933,0.0070449593,0.26488596],"genre_scores_gemma":[0.8609373,0.00030187386,0.078065105,0.00039978483,0.000109900044,0.00068063044,0.0010234872,0.0005710355,0.057910856],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971396,0.000063151056,0.000013978155,0.000054432858,0.000110682915,0.0000437996],"domain_scores_gemma":[0.9996816,0.000041431475,0.00002330216,0.000045550853,0.00015987131,0.00004817272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028040446,0.0005460024,0.00020533438,0.00044316563,0.00042604556,0.0008807493,0.0009955752,0.00048512,0.03600743],"category_scores_gemma":[0.0009765057,0.00025487007,0.00033370958,0.0004233608,0.00019056987,0.001235832,0.0008140935,0.0004665071,0.00602606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011009824,0.00043276805,0.0076236655,0.001007833,0.000104206614,0.0014305656,0.00094276934,0.26960465,0.11322755,0.052915998,0.07263706,0.47897193],"study_design_scores_gemma":[0.0003083954,0.001484695,0.0041816942,0.00011568335,0.00013005537,0.00088900374,0.0009754991,0.6333838,0.045490813,0.027103439,0.2858845,0.000052360636],"about_ca_topic_score_codex":0.0015495311,"about_ca_topic_score_gemma":0.0025143907,"teacher_disagreement_score":0.03600743,"about_ca_system_score_codex":0.0007564638,"about_ca_system_score_gemma":0.0005037577,"threshold_uncertainty_score":0.120456874},"labels":[],"label_agreement":null},{"id":"W4297821057","doi":"10.1002/ese3.1264","title":"Optimal scheduling of DG and EV parking lots simultaneously with demand response based on self‐adjusted PSO and K‐means clustering","year":2022,"lang":"en","type":"article","venue":"Energy Science & Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of New Brunswick; University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Cluster analysis; Distributed generation; Demand response; Smart grid; Sizing; Computer science; Scheduling (production processes); Energy storage; Electric power system; Probabilistic logic; Mathematical optimization; Reliability engineering; Algorithm; Engineering; Electricity; Renewable energy; Power (physics); Artificial intelligence; Mathematics","score_opus":0.004443404265099814,"score_gpt":0.17291120663080287,"score_spread":0.16846780236570305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297821057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2346328,0.00027257024,0.75820446,0.00021890714,0.000092405855,0.00008858053,0.000058079124,0.00039082,0.006041307],"genre_scores_gemma":[0.95840824,0.00004061353,0.04049896,0.00002238772,0.00000914545,0.000036113535,0.000037895057,0.0000146108205,0.00093204895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997832,0.0000774845,0.000011747512,0.00004170574,0.00004956625,0.000036206184],"domain_scores_gemma":[0.9996941,0.00013012615,0.000053084634,0.000021573329,0.00007396265,0.000027123737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039632877,0.00051195646,0.0005932488,0.00033833372,0.00028822946,0.00050415064,0.00055380806,0.00050535396,0.00074805645],"category_scores_gemma":[0.0007961084,0.00029098586,0.00049527246,0.00030388377,0.00028247674,0.00039272688,0.00025859033,0.00036253894,0.00009640457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052912466,0.000030692678,0.00038294826,0.000021796379,0.000020195223,0.000018711758,0.000017654005,0.9884316,0.0010573929,0.0008843143,0.00028053683,0.008801286],"study_design_scores_gemma":[0.0000037114376,0.000011554255,0.00007727703,6.037586e-7,0.0000017513776,0.000002001798,0.0000036609183,0.9995758,0.00015785587,0.0001251331,0.000039296097,0.0000013247087],"about_ca_topic_score_codex":0.0077359118,"about_ca_topic_score_gemma":0.004960576,"teacher_disagreement_score":0.0077359118,"about_ca_system_score_codex":0.0004809166,"about_ca_system_score_gemma":0.00079195364,"threshold_uncertainty_score":0.015381753},"labels":[],"label_agreement":null},{"id":"W4297888211","doi":"10.32920/ryerson.14663079.v2","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Chubu Electric Power Company; University of Waterloo; Tennessee Valley Authority","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Electricity; Environmental economics; Grid; Electric power system; Electricity generation; Distributed generation; Environmental science; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.023559752991153496,"score_gpt":0.24159353165564706,"score_spread":0.21803377866449358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297888211","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035917412,0.0008096278,0.9281214,0.00078505435,0.000093145696,0.0003690477,0.0017287732,0.00053468393,0.031640902],"genre_scores_gemma":[0.69568795,0.00092256087,0.291772,0.00011944917,0.000044876902,0.00078171,0.0019001118,0.0001401408,0.008631203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994679,0.00018519768,0.000022161,0.00009207528,0.00013143219,0.00010128842],"domain_scores_gemma":[0.9994479,0.00026972196,0.00005643353,0.000016699165,0.00016061032,0.000048559283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011716338,0.0012079473,0.0008502023,0.0009991808,0.0006177238,0.0018841585,0.0014755299,0.00096328807,0.006561687],"category_scores_gemma":[0.0014595337,0.0008808765,0.0015374046,0.0012049025,0.0005303538,0.00085241726,0.0012800992,0.0011207333,0.00038381192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000815468,0.000008858679,0.00021814495,0.000024523362,0.000013846889,0.00005290216,0.00002823801,0.9903769,0.000092449984,0.00589969,0.00031254705,0.0029638032],"study_design_scores_gemma":[0.000006267542,0.000010004239,0.00006145962,0.000008123164,0.000008130534,0.0000065022878,0.000033771517,0.99572253,0.00005484101,0.003131765,0.0009534466,0.0000031119898],"about_ca_topic_score_codex":0.06735502,"about_ca_topic_score_gemma":0.07511796,"teacher_disagreement_score":0.06735502,"about_ca_system_score_codex":0.0025372356,"about_ca_system_score_gemma":0.004357199,"threshold_uncertainty_score":0.13392597},"labels":[],"label_agreement":null},{"id":"W4298307398","doi":"10.48550/arxiv.1710.09924","title":"Optimal Ensemble Control of Loads in Distribution Grids with Network\\n Constraints","year":2017,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Optech (Canada)","funders":"","keywords":"Flexibility (engineering); Mathematical optimization; Computer science; Control theory (sociology); Demand response; Markov chain; Power (physics); Dual (grammatical number); Process (computing); Control (management); Engineering; Mathematics; Electricity; Electrical engineering","score_opus":0.024427130073770995,"score_gpt":0.15499914765940195,"score_spread":0.13057201758563097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298307398","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10221644,0.00030215268,0.8876627,0.0004862519,0.000060250306,0.00005104052,0.00010963511,0.00024182175,0.008869742],"genre_scores_gemma":[0.9769596,0.00016539647,0.019711366,0.000054780558,0.000029817864,0.00007275838,0.00008572394,0.000037016816,0.0028834972],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967873,0.00010192564,0.000010736543,0.000082073675,0.00005983688,0.0000667577],"domain_scores_gemma":[0.9994425,0.0003208315,0.0000877948,0.000021919019,0.00008179528,0.000045032757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088875927,0.0008388462,0.0009195011,0.00029037226,0.00039609478,0.001130661,0.0006405257,0.0006936822,0.0012444118],"category_scores_gemma":[0.0014939593,0.0004782111,0.00045186895,0.0003635502,0.00089169334,0.0007334459,0.001227829,0.000884648,0.00011598237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000134629345,0.0000051316706,0.00009758946,0.0000052987853,0.000005762258,0.0000071352465,0.000008351931,0.99615484,0.00016051467,0.0017239748,0.00010000954,0.0017178572],"study_design_scores_gemma":[0.0000015018339,0.0000039145507,0.00002131092,5.5287234e-7,8.128518e-7,5.3454124e-7,0.0000019388654,0.99933416,0.000030198877,0.0005681956,0.000036033332,7.485014e-7],"about_ca_topic_score_codex":0.015648466,"about_ca_topic_score_gemma":0.0090091275,"teacher_disagreement_score":0.015648466,"about_ca_system_score_codex":0.0012458871,"about_ca_system_score_gemma":0.0011759732,"threshold_uncertainty_score":0.031114757},"labels":[],"label_agreement":null},{"id":"W4299411899","doi":"","title":"Scheduling protocol with load managementfor EV charging","year":2014,"lang":"en","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Computer science; Scheduling (production processes); Computer network; Distributed computing; Engineering","score_opus":0.007035896208029587,"score_gpt":0.19518009218814472,"score_spread":0.18814419598011514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299411899","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08635158,0.0020377184,0.85964876,0.0023202999,0.0026641404,0.0013001696,0.0006904313,0.006154319,0.03883256],"genre_scores_gemma":[0.936433,0.00047576893,0.045276478,0.00045446577,0.0003815066,0.00033465555,0.00047315678,0.0002172932,0.015953738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998544,0.00041863785,0.00011722645,0.00017328186,0.0003641982,0.0003826483],"domain_scores_gemma":[0.99839324,0.0005629482,0.00014055717,0.00034159925,0.00044814823,0.00011357857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021531333,0.0010703201,0.0011615526,0.00091340096,0.001617322,0.002186222,0.0014324295,0.0009085092,0.010298346],"category_scores_gemma":[0.002806214,0.00051068247,0.00036265765,0.00096501136,0.0007011477,0.0018877967,0.002225278,0.0014426811,0.0010871647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0042170007,0.0011569611,0.0017314131,0.0008430013,0.00019957265,0.0012872476,0.00054351485,0.3392006,0.061454896,0.19576602,0.05597861,0.33762127],"study_design_scores_gemma":[0.00022598372,0.00023731454,0.00034930682,0.000030888325,0.000047391986,0.00021899167,0.000078284604,0.93782926,0.013676692,0.03317937,0.014071423,0.000055042186],"about_ca_topic_score_codex":0.0023389326,"about_ca_topic_score_gemma":0.0037367388,"teacher_disagreement_score":0.010298346,"about_ca_system_score_codex":0.0017805208,"about_ca_system_score_gemma":0.0023280692,"threshold_uncertainty_score":0.034451365},"labels":[],"label_agreement":null},{"id":"W4299917724","doi":"10.48550/arxiv.1702.04863","title":"Load Synchronization and Sustained Oscillations Induced by Transactive\\n Control","year":2017,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Synchronism; Synchronization (alternating current); Flexibility (engineering); Computer science; Diversity (politics); Control (management); Business; Environmental economics; Microeconomics; Distributed computing; Industrial organization; Economics; Telecommunications","score_opus":0.02641489797726745,"score_gpt":0.16307979011265447,"score_spread":0.13666489213538702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299917724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6270631,0.00019687439,0.34717494,0.0005192631,0.00010240579,0.000055090102,0.000080385274,0.00068135787,0.02412664],"genre_scores_gemma":[0.99790573,0.000022335977,0.001324726,0.000024296929,0.000007733925,0.000006821664,0.000011474759,0.00001104042,0.0006858988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961853,0.0000740685,0.000027029297,0.000088238136,0.00012968818,0.00006243877],"domain_scores_gemma":[0.99882704,0.00047379994,0.0002897976,0.00018138808,0.00017608791,0.000051828338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005039678,0.0002519248,0.00027058026,0.00032044944,0.0002939339,0.00083158916,0.00050950947,0.00039050073,0.0020245276],"category_scores_gemma":[0.0027412951,0.00012614083,0.00018216344,0.0002987945,0.0006909832,0.00068478845,0.0005875984,0.0005261151,0.0002064453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013735282,0.0004152322,0.019292023,0.0001992211,0.00016390152,0.00275876,0.0018408947,0.5029956,0.129094,0.15509498,0.005723577,0.18104821],"study_design_scores_gemma":[0.000035923316,0.00013266763,0.0035898937,0.000010590272,0.00001775598,0.00028310338,0.00015666976,0.96840847,0.008082235,0.017080208,0.0021863787,0.000016101056],"about_ca_topic_score_codex":0.0018336994,"about_ca_topic_score_gemma":0.0011972215,"teacher_disagreement_score":0.0020245276,"about_ca_system_score_codex":0.00062185054,"about_ca_system_score_gemma":0.00022780338,"threshold_uncertainty_score":0.0067727566},"labels":[],"label_agreement":null},{"id":"W4300785275","doi":"","title":"Increase in power demand guarantee: a bilevel approach","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Bilevel optimization; Power demand; Computer science; Power (physics); Power consumption; Algorithm; Physics","score_opus":0.010567865948259113,"score_gpt":0.19959253492366738,"score_spread":0.18902466897540826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300785275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010098394,0.00039332558,0.97985625,0.0010334351,0.00008737089,0.00002959342,0.00013211282,0.00015661654,0.008212858],"genre_scores_gemma":[0.77450114,0.0013495138,0.20371975,0.00043669218,0.0003732052,0.00020063506,0.00037782232,0.00049450045,0.018546794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99723023,0.0011331851,0.00013346755,0.0005172049,0.0005781697,0.00040761376],"domain_scores_gemma":[0.9915019,0.0061007687,0.00052167237,0.00063236663,0.0008774628,0.0003657462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005120048,0.0016980836,0.0031129776,0.0016993645,0.00087740173,0.0061069406,0.0028035748,0.0030488044,0.011664005],"category_scores_gemma":[0.03012379,0.0013414564,0.001474183,0.0030312208,0.0020235914,0.006535738,0.0053784396,0.0044424413,0.0010259125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023250947,0.00011514698,0.0007594665,0.00034215456,0.00011669512,0.0001834764,0.00021063493,0.69977796,0.00058287324,0.249367,0.0036556227,0.044656463],"study_design_scores_gemma":[0.000010153605,0.000025787924,0.000049299862,0.000030079435,0.000015216485,0.00004381811,0.000035882902,0.8584859,0.00015156028,0.14026235,0.00088074914,0.000009256079],"about_ca_topic_score_codex":0.001974211,"about_ca_topic_score_gemma":0.0012842495,"teacher_disagreement_score":0.011664005,"about_ca_system_score_codex":0.0014362412,"about_ca_system_score_gemma":0.0013583739,"threshold_uncertainty_score":0.039020002},"labels":[],"label_agreement":null},{"id":"W4300982014","doi":"10.1016/j.egyai.2022.100208","title":"Methods and applications for Artificial Intelligence, Big Data, Internet of Things, and Blockchain in smart energy management","year":2022,"lang":"en","type":"article","venue":"Energy and AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":396,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Ontario Centre of Innovation","keywords":"Big data; Computer science; Cloud computing; Blockchain; Data science; The Internet; Software deployment; World Wide Web; Computer security; Data mining; Software engineering","score_opus":0.028957884421517255,"score_gpt":0.27319123752440666,"score_spread":0.2442333531028894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300982014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003000306,0.10112387,0.81885433,0.015656374,0.0020898422,0.00027081382,0.00024086086,0.0003453622,0.05841826],"genre_scores_gemma":[0.17098357,0.15891354,0.62389076,0.004551272,0.0053547365,0.0017894314,0.00060074066,0.00026705887,0.03364895],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99583,0.0018803518,0.00036988946,0.0004801408,0.0012795875,0.0001600283],"domain_scores_gemma":[0.9934348,0.0048687467,0.00037388352,0.0006100712,0.0005378529,0.00017464142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005753107,0.0013702692,0.0011756731,0.0050449353,0.0011313559,0.005010988,0.0020449501,0.003440732,0.004625055],"category_scores_gemma":[0.0076391143,0.00072338665,0.0019407442,0.006624022,0.0054894644,0.0072111366,0.0034270103,0.004210487,0.0016433704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015896907,0.000041858893,0.00050240656,0.00068074866,0.000058947575,0.00020296776,0.00024112489,0.007832761,0.00039728815,0.9283261,0.0049149645,0.05678501],"study_design_scores_gemma":[0.000010920619,0.00002514452,0.00026867545,0.00058023684,0.000023484681,0.0002450988,0.00014728954,0.031071458,0.0005061377,0.8928215,0.07425842,0.000041550942],"about_ca_topic_score_codex":0.001879919,"about_ca_topic_score_gemma":0.001742233,"teacher_disagreement_score":0.005753107,"about_ca_system_score_codex":0.0021979108,"about_ca_system_score_gemma":0.002372834,"threshold_uncertainty_score":0.030425668},"labels":[],"label_agreement":null},{"id":"W4302406590","doi":"10.48550/arxiv.1412.0939","title":"A concise, approximate representation of a collection of loads described\\n by polytopes","year":2014,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Polytope; Minkowski space; Minkowski addition; Computer science; Demand response; Regular polygon; Representation (politics); Class (philosophy); Mathematical optimization; Set (abstract data type); Variable (mathematics); Power (physics); Applied mathematics; Mathematics; Discrete mathematics; Electricity; Artificial intelligence","score_opus":0.038186879970983655,"score_gpt":0.16947726892765047,"score_spread":0.1312903889566668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4302406590","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008993331,0.00014757804,0.986621,0.000119408454,0.000029294073,0.000018847504,0.0003174886,0.00016065207,0.00359243],"genre_scores_gemma":[0.5568436,0.0014675014,0.43065652,0.00017412889,0.00014452143,0.0002774495,0.0019676115,0.00021256607,0.008256144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9994947,0.0001260313,0.000037448746,0.00011340953,0.00015152068,0.00007695145],"domain_scores_gemma":[0.9993887,0.00024277697,0.00009758243,0.00015212574,0.00009358306,0.00002517541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060931075,0.0012629541,0.00085005036,0.00064970163,0.00042425303,0.0021734112,0.0010755934,0.0007596915,0.002843457],"category_scores_gemma":[0.0020151513,0.0004312529,0.00080255343,0.0013516273,0.00072594424,0.0022939185,0.0008716638,0.0013990792,0.00074145326],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019084067,0.000016110893,0.0003065244,0.000054650212,0.000012250994,0.0000643598,0.000035432528,0.9391396,0.0010008663,0.04745927,0.0011789894,0.010712838],"study_design_scores_gemma":[0.0000020470407,0.000007975602,0.000075874326,0.000005816868,0.0000037268198,0.00002674856,0.00001837378,0.9812392,0.00027711387,0.016666371,0.0016720555,0.0000045591637],"about_ca_topic_score_codex":0.004148382,"about_ca_topic_score_gemma":0.0037387363,"teacher_disagreement_score":0.004148382,"about_ca_system_score_codex":0.00095663744,"about_ca_system_score_gemma":0.0008300276,"threshold_uncertainty_score":0.009512365},"labels":[],"label_agreement":null},{"id":"W4307442560","doi":"10.32920/21408582.v1","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Demand patterns; Microeconomics; Work (physics); Economics; Demand management; Market demand schedule; Demand response; On demand; Demand curve; Business; Operations research; Industrial organization; Commerce; Electricity; Engineering; International economics","score_opus":0.012476489301100417,"score_gpt":0.24494551284332158,"score_spread":0.23246902354222115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008218258,0.0005045877,0.96162677,0.0012015009,0.000085102416,0.00015494156,0.00040350368,0.00022909472,0.02757626],"genre_scores_gemma":[0.6368936,0.0016928982,0.3310454,0.0006768264,0.00016109018,0.0010221071,0.00057951966,0.0003673873,0.027561186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991185,0.0003881541,0.000023798633,0.00014824439,0.00018591939,0.00013534244],"domain_scores_gemma":[0.9990194,0.0006426345,0.0000914367,0.00003962161,0.00013847485,0.00006836912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019313699,0.0015535688,0.0011221868,0.0007808432,0.00055000425,0.0023887644,0.0020503893,0.0021586388,0.011969576],"category_scores_gemma":[0.0029978342,0.00088339177,0.0014231388,0.0011459826,0.0010967201,0.0015809941,0.0016423209,0.0020456791,0.0010117294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031014086,0.000048046557,0.00018662943,0.00007800534,0.000019524947,0.000078007935,0.000051193507,0.9173841,0.0004059401,0.073073044,0.0022548465,0.006389715],"study_design_scores_gemma":[0.000020374167,0.000022823686,0.00006113955,0.000014593109,0.0000076431625,0.000017953938,0.000022533915,0.98243874,0.00010382588,0.015357149,0.0019256623,0.0000075136013],"about_ca_topic_score_codex":0.012870373,"about_ca_topic_score_gemma":0.010712196,"teacher_disagreement_score":0.012870373,"about_ca_system_score_codex":0.0026067928,"about_ca_system_score_gemma":0.003261637,"threshold_uncertainty_score":0.040042162},"labels":[],"label_agreement":null},{"id":"W4307442694","doi":"10.32920/21408588","title":"Demand response procurement framework: a new four-step probabilistic method","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Market clearing; Procurement; Microeconomics; Economics; Electricity market; Supply and demand; Clearing; Demand response; Business; Electricity; Industrial organization; Finance; Marketing","score_opus":0.035914997189028124,"score_gpt":0.2822525421460688,"score_spread":0.2463375449570407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041644127,0.000028736296,0.9981262,0.00008016727,0.000014118672,0.00003145797,0.000027274655,0.00007602733,0.0011995351],"genre_scores_gemma":[0.09467193,0.00024915647,0.89614785,0.0002090249,0.00013470743,0.00040298043,0.000225322,0.00026572827,0.0076932176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99590045,0.0021536816,0.0001609571,0.0004590614,0.0010993234,0.00022647322],"domain_scores_gemma":[0.9958087,0.0027803176,0.0002472546,0.00040453087,0.0006192661,0.00013985146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006211774,0.00094872835,0.0012331336,0.0013256043,0.00068774825,0.0023493357,0.00343577,0.0016986926,0.012273847],"category_scores_gemma":[0.009784042,0.0012026437,0.0020519588,0.0014942737,0.0012626835,0.0033158406,0.00270547,0.0027329547,0.002356162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085229745,0.00012156977,0.00061803026,0.00015337025,0.00009198367,0.00013338336,0.00015302471,0.64062536,0.0013102992,0.26722765,0.0033691602,0.086110964],"study_design_scores_gemma":[0.000015757982,0.000024854799,0.0000476462,0.000010903999,0.000008559725,0.000035655692,0.000013695005,0.95695454,0.00022629526,0.03964761,0.002997561,0.000016937154],"about_ca_topic_score_codex":0.003509577,"about_ca_topic_score_gemma":0.0029916537,"teacher_disagreement_score":0.012273847,"about_ca_system_score_codex":0.0016025068,"about_ca_system_score_gemma":0.0028317107,"threshold_uncertainty_score":0.04106009},"labels":[],"label_agreement":null},{"id":"W4307442780","doi":"10.32920/21408588.v1","title":"Demand response procurement framework: a new four-step probabilistic method","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Market clearing; Procurement; Microeconomics; Economics; Electricity market; Supply and demand; Clearing; Demand response; Industrial organization; Business; Electricity; Marketing; Finance","score_opus":0.035914997189028124,"score_gpt":0.2822525421460688,"score_spread":0.2463375449570407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041644127,0.000028736296,0.9981262,0.00008016727,0.000014118672,0.00003145797,0.000027274655,0.00007602733,0.0011995351],"genre_scores_gemma":[0.09467193,0.00024915647,0.89614785,0.0002090249,0.00013470743,0.00040298043,0.000225322,0.00026572827,0.0076932176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99590045,0.0021536816,0.0001609571,0.0004590614,0.0010993234,0.00022647322],"domain_scores_gemma":[0.9958087,0.0027803176,0.0002472546,0.00040453087,0.0006192661,0.00013985146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006211774,0.00094872835,0.0012331336,0.0013256043,0.00068774825,0.0023493357,0.00343577,0.0016986926,0.012273847],"category_scores_gemma":[0.009784042,0.0012026437,0.0020519588,0.0014942737,0.0012626835,0.0033158406,0.00270547,0.0027329547,0.002356162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085229745,0.00012156977,0.00061803026,0.00015337025,0.00009198367,0.00013338336,0.00015302471,0.64062536,0.0013102992,0.26722765,0.0033691602,0.086110964],"study_design_scores_gemma":[0.000015757982,0.000024854799,0.0000476462,0.000010903999,0.000008559725,0.000035655692,0.000013695005,0.95695454,0.00022629526,0.03964761,0.002997561,0.000016937154],"about_ca_topic_score_codex":0.003509577,"about_ca_topic_score_gemma":0.0029916537,"teacher_disagreement_score":0.012273847,"about_ca_system_score_codex":0.0016025068,"about_ca_system_score_gemma":0.0028317107,"threshold_uncertainty_score":0.04106009},"labels":[],"label_agreement":null},{"id":"W4307445389","doi":"10.32920/21408585","title":"Value-stack aggregator optimal planning considering disparate DERs technologies","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Value proposition; Computer science; Capacity planning; Energy planning; Environmental economics; Business model; Business; Time horizon; Renewable energy; Economics; Engineering; Finance; Marketing","score_opus":0.022342585849414932,"score_gpt":0.2422480279101956,"score_spread":0.21990544206078066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16263352,0.0012694424,0.76575327,0.001160513,0.00013780862,0.0004052472,0.0013676651,0.0005470647,0.06672554],"genre_scores_gemma":[0.92825633,0.0004695912,0.05827684,0.000127556,0.000025433661,0.00029799587,0.00051724544,0.0000830726,0.011945947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994486,0.00022175572,0.000018628676,0.00009208834,0.00009683512,0.00012209361],"domain_scores_gemma":[0.99905854,0.0005763289,0.00008884267,0.000027321697,0.00016467163,0.000084291285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011414351,0.0013157242,0.0013623058,0.00073806656,0.00065881136,0.0023227823,0.0010010675,0.0014197371,0.0048954585],"category_scores_gemma":[0.0020814172,0.00085968216,0.0009954567,0.0011679811,0.0007845467,0.0011306378,0.0011979498,0.0012548084,0.00038090552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011471074,0.0000066038824,0.00007904676,0.000008717508,0.00000545613,0.000026075459,0.000006336735,0.9965688,0.000057791432,0.0015888924,0.00015312877,0.0014876022],"study_design_scores_gemma":[0.000004753179,0.000010626565,0.000041712632,0.00000282626,0.0000043690725,0.0000030982899,0.000011118971,0.9983418,0.000045751676,0.0013463667,0.0001846814,0.0000028455893],"about_ca_topic_score_codex":0.031769697,"about_ca_topic_score_gemma":0.029250385,"teacher_disagreement_score":0.031769697,"about_ca_system_score_codex":0.0023415033,"about_ca_system_score_gemma":0.0030035533,"threshold_uncertainty_score":0.06316954},"labels":[],"label_agreement":null},{"id":"W4307445399","doi":"10.32920/21408573","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Mathematical optimization; Computer science; Prosumer; Energy storage; Grid; Investment (military); Electricity; Environmental economics; Reliability engineering; Power (physics); Engineering; Electrical engineering; Economics; Production (economics); Mathematics; Microeconomics","score_opus":0.030588440527077987,"score_gpt":0.23173078873170702,"score_spread":0.20114234820462903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445399","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08143413,0.0007518319,0.907191,0.0006259521,0.000056956884,0.0001172153,0.00028958378,0.0001449836,0.009388288],"genre_scores_gemma":[0.91849875,0.00066529535,0.0764671,0.00011857678,0.00004961945,0.00022461804,0.0002342893,0.000060940845,0.0036808364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935085,0.00030909159,0.000023451481,0.00007706256,0.0001253836,0.00011416546],"domain_scores_gemma":[0.9987357,0.0009012852,0.0001326278,0.000028465589,0.00013623422,0.000065711276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012178505,0.001049841,0.0013311077,0.00069221575,0.0003908946,0.0015986321,0.0009237614,0.0010713107,0.002298393],"category_scores_gemma":[0.0022589595,0.0012105227,0.0009908803,0.00089469756,0.00068523566,0.0008880905,0.000794582,0.001159354,0.00018322187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009334915,0.0000053150816,0.000066863344,0.000009915741,0.00000771719,0.000017184411,0.0000047769745,0.99722505,0.0000869673,0.0015438097,0.00005408865,0.0009689819],"study_design_scores_gemma":[0.0000032351145,0.000008364195,0.000031345597,0.0000035120954,0.000003867681,0.0000037038596,0.0000063337325,0.99850094,0.000058960388,0.0012916633,0.0000862863,0.0000018672051],"about_ca_topic_score_codex":0.009409598,"about_ca_topic_score_gemma":0.008895016,"teacher_disagreement_score":0.009409598,"about_ca_system_score_codex":0.0013683842,"about_ca_system_score_gemma":0.0019798996,"threshold_uncertainty_score":0.01870966},"labels":[],"label_agreement":null},{"id":"W4307445416","doi":"10.32920/21408585.v1","title":"Value-stack aggregator optimal planning considering disparate DERs technologies","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Value proposition; Capacity planning; Computer science; Energy planning; Business model; Environmental economics; Business; Net metering; Renewable energy; Economics; Engineering; Marketing; Finance","score_opus":0.022342585849414932,"score_gpt":0.2422480279101956,"score_spread":0.21990544206078066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16263352,0.0012694424,0.76575327,0.001160513,0.00013780862,0.0004052472,0.0013676651,0.0005470647,0.06672554],"genre_scores_gemma":[0.92825633,0.0004695912,0.05827684,0.000127556,0.000025433661,0.00029799587,0.00051724544,0.0000830726,0.011945947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994486,0.00022175572,0.000018628676,0.00009208834,0.00009683512,0.00012209361],"domain_scores_gemma":[0.99905854,0.0005763289,0.00008884267,0.000027321697,0.00016467163,0.000084291285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011414351,0.0013157242,0.0013623058,0.00073806656,0.00065881136,0.0023227823,0.0010010675,0.0014197371,0.0048954585],"category_scores_gemma":[0.0020814172,0.00085968216,0.0009954567,0.0011679811,0.0007845467,0.0011306378,0.0011979498,0.0012548084,0.00038090552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011471074,0.0000066038824,0.00007904676,0.000008717508,0.00000545613,0.000026075459,0.000006336735,0.9965688,0.000057791432,0.0015888924,0.00015312877,0.0014876022],"study_design_scores_gemma":[0.000004753179,0.000010626565,0.000041712632,0.00000282626,0.0000043690725,0.0000030982899,0.000011118971,0.9983418,0.000045751676,0.0013463667,0.0001846814,0.0000028455893],"about_ca_topic_score_codex":0.031769697,"about_ca_topic_score_gemma":0.029250385,"teacher_disagreement_score":0.031769697,"about_ca_system_score_codex":0.0023415033,"about_ca_system_score_gemma":0.0030035533,"threshold_uncertainty_score":0.06316954},"labels":[],"label_agreement":null},{"id":"W4307445480","doi":"10.32920/21408573.v1","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Mathematical optimization; Computer science; Prosumer; Energy storage; Grid; Electricity; Investment (military); Reliability engineering; Environmental economics; Power (physics); Engineering; Electrical engineering; Mathematics; Economics; Production (economics); Microeconomics","score_opus":0.030588440527077987,"score_gpt":0.23173078873170702,"score_spread":0.20114234820462903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08143413,0.0007518319,0.907191,0.0006259521,0.000056956884,0.0001172153,0.00028958378,0.0001449836,0.009388288],"genre_scores_gemma":[0.91849875,0.00066529535,0.0764671,0.00011857678,0.00004961945,0.00022461804,0.0002342893,0.000060940845,0.0036808364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935085,0.00030909159,0.000023451481,0.00007706256,0.0001253836,0.00011416546],"domain_scores_gemma":[0.9987357,0.0009012852,0.0001326278,0.000028465589,0.00013623422,0.000065711276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012178505,0.001049841,0.0013311077,0.00069221575,0.0003908946,0.0015986321,0.0009237614,0.0010713107,0.002298393],"category_scores_gemma":[0.0022589595,0.0012105227,0.0009908803,0.00089469756,0.00068523566,0.0008880905,0.000794582,0.001159354,0.00018322187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009334915,0.0000053150816,0.000066863344,0.000009915741,0.00000771719,0.000017184411,0.0000047769745,0.99722505,0.0000869673,0.0015438097,0.00005408865,0.0009689819],"study_design_scores_gemma":[0.0000032351145,0.000008364195,0.000031345597,0.0000035120954,0.000003867681,0.0000037038596,0.0000063337325,0.99850094,0.000058960388,0.0012916633,0.0000862863,0.0000018672051],"about_ca_topic_score_codex":0.009409598,"about_ca_topic_score_gemma":0.008895016,"teacher_disagreement_score":0.009409598,"about_ca_system_score_codex":0.0013683842,"about_ca_system_score_gemma":0.0019798996,"threshold_uncertainty_score":0.01870966},"labels":[],"label_agreement":null},{"id":"W4307445508","doi":"10.32920/21408591","title":"Appliance Scheduling Optimization in Smart Home Networks","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Smart grid; Scheduling (production processes); Schedule; Computer science; Electricity; Mathematical optimization; Grid; Home automation; Integer programming; Real-time computing; Engineering; Electrical engineering; Telecommunications; Algorithm; Mathematics","score_opus":0.010653606527533093,"score_gpt":0.2043330758925649,"score_spread":0.19367946936503183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.121413425,0.001138559,0.8623664,0.00072745775,0.00017244207,0.00009511166,0.0002963857,0.00044930459,0.013340906],"genre_scores_gemma":[0.911887,0.0006574739,0.07643933,0.00012756037,0.00010575611,0.00013296425,0.00025332338,0.00011599362,0.010280642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962735,0.00016561973,0.000011916117,0.00007911926,0.000050868646,0.00006511687],"domain_scores_gemma":[0.99963164,0.00022998046,0.000058119895,0.000017180177,0.000036460166,0.000026601461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005851564,0.00070376246,0.0008247768,0.00036529754,0.00033494114,0.00076991523,0.0005605638,0.00059786736,0.0026643404],"category_scores_gemma":[0.0010907395,0.00039965098,0.000319711,0.00072930625,0.00039295905,0.0007548831,0.00044811136,0.00051998737,0.00025422982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004813341,0.000024434825,0.0001975396,0.000028236298,0.0000149158695,0.00003059721,0.000014788607,0.9822495,0.0005416109,0.00563904,0.0009655977,0.010245542],"study_design_scores_gemma":[0.0000064058568,0.00001258614,0.00007063435,0.0000016368078,0.0000023511436,0.000006307199,0.000009301783,0.9955011,0.00014894511,0.003766375,0.00047269335,0.0000015152918],"about_ca_topic_score_codex":0.0044699013,"about_ca_topic_score_gemma":0.003669389,"teacher_disagreement_score":0.0044699013,"about_ca_system_score_codex":0.0009856588,"about_ca_system_score_gemma":0.0006619914,"threshold_uncertainty_score":0.00891304},"labels":[],"label_agreement":null},{"id":"W4307525929","doi":"10.32920/21408591.v1","title":"Appliance Scheduling Optimization in Smart Home Networks","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Smart grid; Scheduling (production processes); Computer science; Schedule; Electricity; Home automation; Mathematical optimization; Integer programming; Grid; Real-time computing; Engineering; Electrical engineering; Telecommunications; Algorithm; Mathematics","score_opus":0.010653606527533093,"score_gpt":0.2043330758925649,"score_spread":0.19367946936503183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307525929","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.121413425,0.001138559,0.8623664,0.00072745775,0.00017244207,0.00009511166,0.0002963857,0.00044930459,0.013340906],"genre_scores_gemma":[0.911887,0.0006574739,0.07643933,0.00012756037,0.00010575611,0.00013296425,0.00025332338,0.00011599362,0.010280642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962735,0.00016561973,0.000011916117,0.00007911926,0.000050868646,0.00006511687],"domain_scores_gemma":[0.99963164,0.00022998046,0.000058119895,0.000017180177,0.000036460166,0.000026601461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005851564,0.00070376246,0.0008247768,0.00036529754,0.00033494114,0.00076991523,0.0005605638,0.00059786736,0.0026643404],"category_scores_gemma":[0.0010907395,0.00039965098,0.000319711,0.00072930625,0.00039295905,0.0007548831,0.00044811136,0.00051998737,0.00025422982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004813341,0.000024434825,0.0001975396,0.000028236298,0.0000149158695,0.00003059721,0.000014788607,0.9822495,0.0005416109,0.00563904,0.0009655977,0.010245542],"study_design_scores_gemma":[0.0000064058568,0.00001258614,0.00007063435,0.0000016368078,0.0000023511436,0.000006307199,0.000009301783,0.9955011,0.00014894511,0.003766375,0.00047269335,0.0000015152918],"about_ca_topic_score_codex":0.0044699013,"about_ca_topic_score_gemma":0.003669389,"teacher_disagreement_score":0.0044699013,"about_ca_system_score_codex":0.0009856588,"about_ca_system_score_gemma":0.0006619914,"threshold_uncertainty_score":0.00891304},"labels":[],"label_agreement":null},{"id":"W4307526243","doi":"10.32920/21408582","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Work (physics); Microeconomics; Demand patterns; Demand management; Economics; Market demand schedule; Business; Demand response; On demand; Demand curve; Industrial organization; Operations research; Commerce; Electricity; International economics; Engineering","score_opus":0.012476489301100417,"score_gpt":0.24494551284332158,"score_spread":0.23246902354222115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307526243","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008218258,0.0005045877,0.96162677,0.0012015009,0.000085102416,0.00015494156,0.00040350368,0.00022909472,0.02757626],"genre_scores_gemma":[0.6368936,0.0016928982,0.3310454,0.0006768264,0.00016109018,0.0010221071,0.00057951966,0.0003673873,0.027561186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991185,0.0003881541,0.000023798633,0.00014824439,0.00018591939,0.00013534244],"domain_scores_gemma":[0.9990194,0.0006426345,0.0000914367,0.00003962161,0.00013847485,0.00006836912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019313699,0.0015535688,0.0011221868,0.0007808432,0.00055000425,0.0023887644,0.0020503893,0.0021586388,0.011969576],"category_scores_gemma":[0.0029978342,0.00088339177,0.0014231388,0.0011459826,0.0010967201,0.0015809941,0.0016423209,0.0020456791,0.0010117294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031014086,0.000048046557,0.00018662943,0.00007800534,0.000019524947,0.000078007935,0.000051193507,0.9173841,0.0004059401,0.073073044,0.0022548465,0.006389715],"study_design_scores_gemma":[0.000020374167,0.000022823686,0.00006113955,0.000014593109,0.0000076431625,0.000017953938,0.000022533915,0.98243874,0.00010382588,0.015357149,0.0019256623,0.0000075136013],"about_ca_topic_score_codex":0.012870373,"about_ca_topic_score_gemma":0.010712196,"teacher_disagreement_score":0.012870373,"about_ca_system_score_codex":0.0026067928,"about_ca_system_score_gemma":0.003261637,"threshold_uncertainty_score":0.040042162},"labels":[],"label_agreement":null},{"id":"W4308087395","doi":"10.1109/isc255366.2022.9921890","title":"Optimal Regulation of Prosumers and Consumers in Smart Energy Communities","year":2022,"lang":"en","type":"article","venue":"2022 IEEE International Smart Cities Conference (ISC2)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prosumer; Probabilistic logic; Photovoltaic system; Computer science; Environmental economics; Renewable energy; Business; Mathematical optimization; Engineering; Economics; Mathematics; Electrical engineering; Artificial intelligence","score_opus":0.02018313188344867,"score_gpt":0.21640207831201902,"score_spread":0.19621894642857035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308087395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24564996,0.00023117174,0.74826515,0.0005285048,0.000039362225,0.00017490177,0.00006997469,0.00032687577,0.00471419],"genre_scores_gemma":[0.9488827,0.000076992044,0.049238462,0.00009822184,0.000017965518,0.00011981166,0.000042100703,0.000028502032,0.0014952682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986029,0.00048080945,0.000046881385,0.00039224993,0.00024748722,0.00022962944],"domain_scores_gemma":[0.99524224,0.0029305373,0.00066289224,0.0002538385,0.00053279725,0.00037779252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002246498,0.0008412436,0.0012498236,0.00046295187,0.001007367,0.0011908471,0.001923288,0.001099064,0.0016879981],"category_scores_gemma":[0.008242418,0.0005396257,0.00046342716,0.0005231874,0.0011517763,0.0021224075,0.0016888992,0.0010450598,0.00023919692],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030206708,0.00020452627,0.002186056,0.000054314933,0.00004371867,0.00009867171,0.0001917623,0.95170546,0.00457916,0.015334637,0.00077497226,0.02452461],"study_design_scores_gemma":[0.00003044254,0.000049258462,0.00019452396,0.0000035728,0.00000785868,0.000020790618,0.00006200732,0.9885656,0.00083079684,0.009921668,0.00030661747,0.000006794767],"about_ca_topic_score_codex":0.003068051,"about_ca_topic_score_gemma":0.0041751703,"teacher_disagreement_score":0.003068051,"about_ca_system_score_codex":0.0011508069,"about_ca_system_score_gemma":0.001214336,"threshold_uncertainty_score":0.011880755},"labels":[],"label_agreement":null},{"id":"W4308090776","doi":"10.1109/ccece49351.2022.9918351","title":"A Novel Flexible and Scalable Nonintrusive Load Monitoring Approach Using Wavelet Design and Machine Learning","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scalability; Computer science; Wavelet; Flexibility (engineering); Cluster analysis; Classifier (UML); Artificial intelligence; Decision tree; Machine learning","score_opus":0.03525433294900176,"score_gpt":0.21003107570915916,"score_spread":0.1747767427601574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308090776","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036282607,0.00005915321,0.9957496,0.000024384162,0.000011779137,0.000013027242,0.000006547542,0.00011890687,0.00038841268],"genre_scores_gemma":[0.23846567,0.00032286308,0.7586818,0.00006939648,0.000081750564,0.00010392283,0.000088020686,0.00010311684,0.0020835411],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995784,0.00009139412,0.00002237634,0.00008892908,0.00019551128,0.000023319672],"domain_scores_gemma":[0.9996669,0.000104546394,0.00006488079,0.00007725547,0.00007069984,0.000015727977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051365996,0.0006972994,0.0006229025,0.00060830143,0.00021704243,0.0006402383,0.00084738206,0.00056493044,0.0008170705],"category_scores_gemma":[0.00093605666,0.00031973934,0.00046841401,0.00057666836,0.00033095063,0.0012448468,0.0006553899,0.0007357723,0.00042468717],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020509334,0.00019822217,0.0013961358,0.0002493036,0.000093100345,0.00024564806,0.0001874072,0.11826701,0.2002564,0.025470292,0.0018923433,0.65153897],"study_design_scores_gemma":[0.000013545336,0.00014084726,0.00048952823,0.000012266482,0.000021101445,0.00017552177,0.000018631374,0.970737,0.020058798,0.0052584447,0.0030560843,0.0000181842],"about_ca_topic_score_codex":0.00021276438,"about_ca_topic_score_gemma":0.00026807256,"teacher_disagreement_score":0.00084738206,"about_ca_system_score_codex":0.0001905428,"about_ca_system_score_gemma":0.00024218988,"threshold_uncertainty_score":0.0027333498},"labels":[],"label_agreement":null},{"id":"W4308091082","doi":"10.1109/ccece49351.2022.9918403","title":"Non-Intrusive Load Monitoring Using Machine Learning Accelerator Hardware for Smart Meters","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Bottleneck; Computer science; Metering mode; Electricity; Flexibility (engineering); Electricity meter; Smart meter; Acceleration; Real-time computing; Embedded system; Smart grid; Energy (signal processing); Hardware acceleration; Energy consumption; Efficient energy use; Computer hardware; Field-programmable gate array; Engineering; Power (physics)","score_opus":0.02254828080235829,"score_gpt":0.23142743313708602,"score_spread":0.20887915233472773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308091082","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39277458,0.0008895563,0.5622765,0.00088256464,0.0003853254,0.0002454426,0.0017797854,0.03253249,0.008233683],"genre_scores_gemma":[0.82363814,0.00018139253,0.1718464,0.00014144834,0.000031877746,0.00009601702,0.0016102252,0.00014040704,0.002313986],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99976045,0.000049805167,0.000013867825,0.000053487183,0.0001003078,0.000022081653],"domain_scores_gemma":[0.9996283,0.000121766796,0.000048926944,0.00010447149,0.00007800056,0.000018348865],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031029055,0.00048878574,0.00033556938,0.00029254748,0.00015868885,0.00041812673,0.00088738755,0.0002788675,0.0027700264],"category_scores_gemma":[0.0011933146,0.00017128632,0.0001794537,0.0004934523,0.00016505363,0.00084261585,0.00039674953,0.0005265448,0.00077056815],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001635806,0.00055202,0.01828264,0.00048527523,0.0001387223,0.00033917787,0.000121286765,0.18061486,0.09508802,0.005298212,0.022806078,0.67463785],"study_design_scores_gemma":[0.000097259544,0.00028447228,0.005850482,0.000016608898,0.000019977278,0.00010237955,0.000033507597,0.91789085,0.061985094,0.0018636008,0.011834348,0.000021428812],"about_ca_topic_score_codex":0.0015612704,"about_ca_topic_score_gemma":0.0025277224,"teacher_disagreement_score":0.0027700264,"about_ca_system_score_codex":0.00049244304,"about_ca_system_score_gemma":0.00046968646,"threshold_uncertainty_score":0.0092666745},"labels":[],"label_agreement":null},{"id":"W4308391685","doi":"10.3390/electronics11213610","title":"Maximizing the Electricity Cost-Savings for Local Distribution System Using a New Peak-Shaving Approach Based on Mixed Integer Linear Programming","year":2022,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Emera","keywords":"Peaking power plant; Integer programming; Linear programming; Electricity; Mathematical optimization; Computer science; Energy storage; Power (physics); Automotive engineering; Distributed generation; Reliability engineering; Algorithm; Engineering; Renewable energy; Mathematics; Electrical engineering","score_opus":0.016028608695632524,"score_gpt":0.21426051236145352,"score_spread":0.198231903665821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308391685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06259224,0.00017949862,0.93032134,0.00022362986,0.000021479535,0.000104444516,0.000054967,0.0003135121,0.006188844],"genre_scores_gemma":[0.82377833,0.000159564,0.17122518,0.00008238378,0.000023810762,0.00016028572,0.00007886812,0.00007442826,0.0044172294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973017,0.00010773494,0.000008785856,0.00004912921,0.0000633109,0.000040874103],"domain_scores_gemma":[0.99968636,0.00018979124,0.00003910905,0.000015998594,0.000050957595,0.000017724169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007671524,0.0007582057,0.0007129683,0.0004538478,0.00028222907,0.0010495121,0.0008214477,0.0005378159,0.0017242727],"category_scores_gemma":[0.00084981555,0.00037291614,0.0004162145,0.00056032103,0.00034509442,0.0008050251,0.00048148748,0.00070927595,0.00015608636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030426274,0.000035650846,0.00019648118,0.000023466442,0.0000113035085,0.000018779401,0.000014460565,0.98175,0.0009149544,0.001643805,0.00021853458,0.015142113],"study_design_scores_gemma":[0.0000031013863,0.000017461769,0.000031643132,0.0000012611741,0.0000024641001,0.0000035901242,0.0000043948,0.99918896,0.0002714427,0.0003709602,0.0001034658,0.0000012149941],"about_ca_topic_score_codex":0.003958888,"about_ca_topic_score_gemma":0.0062459013,"teacher_disagreement_score":0.003958888,"about_ca_system_score_codex":0.0008941891,"about_ca_system_score_gemma":0.0010156803,"threshold_uncertainty_score":0.007871687},"labels":[],"label_agreement":null},{"id":"W4308512602","doi":"10.3390/jrfm15110521","title":"Energy Communities Overview: Managerial Policies, Economic Aspects, Technologies, and Models","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Context (archaeology); Greenhouse gas; Autonomy; Renewable energy; Business; Energy transition; European union; Environmental resource management; Environmental economics; Energy policy; Efficient energy use; Empowerment; Political science; Economic growth; Economics; Engineering; Geography; Ecology; Economic policy","score_opus":0.008927111932370899,"score_gpt":0.17999847193222474,"score_spread":0.17107135999985384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308512602","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030457843,0.2774115,0.023495484,0.07550576,0.001081052,0.00033507094,0.00087498344,0.0001447418,0.59069365],"genre_scores_gemma":[0.6261205,0.29912934,0.0123726735,0.0067257592,0.0008686916,0.0006263548,0.00089584634,0.00009132031,0.05316952],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99842715,0.00071658054,0.000067177374,0.00017842052,0.00037768562,0.00023310758],"domain_scores_gemma":[0.99820447,0.0011182253,0.0001932858,0.000067317385,0.00029228404,0.00012450048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024503411,0.0005430399,0.00038188833,0.0043984484,0.0021531128,0.0062559717,0.0011533858,0.0023571395,0.0093979025],"category_scores_gemma":[0.0034266228,0.00024812977,0.0004930865,0.006406546,0.0026016813,0.0069712223,0.0027595575,0.0016746944,0.001043563],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015933307,0.00005522288,0.0008774216,0.0013001813,0.000015948783,0.00014607712,0.001956603,0.0017342265,0.000072427705,0.92996025,0.013155507,0.050710186],"study_design_scores_gemma":[0.000017346994,0.000037990594,0.0027735874,0.006337393,0.000053172596,0.0002076002,0.008416116,0.0031735792,0.00023850334,0.29745004,0.68126553,0.000029062357],"about_ca_topic_score_codex":0.0120458435,"about_ca_topic_score_gemma":0.013004788,"teacher_disagreement_score":0.0120458435,"about_ca_system_score_codex":0.0066894437,"about_ca_system_score_gemma":0.0070274165,"threshold_uncertainty_score":0.048535526},"labels":[],"label_agreement":null},{"id":"W4309708571","doi":"10.3390/electronics11223769","title":"A New Energy-Aware Method for Gas Lift Allocation in IoT-Based Industries Using a Chemical Reaction-Based Optimization Algorithm","year":2022,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Gas lift; Computer science; Flexibility (engineering); Fossil fuel; Process engineering; Lift (data mining); Rate of convergence; Production (economics); Energy supply; Petrochemical; Mathematical optimization; Algorithm; Environmental science; Engineering; Petroleum engineering; Energy (signal processing); Environmental engineering; Waste management; Mathematics; Channel (broadcasting); Telecommunications; Data mining","score_opus":0.011300546956847466,"score_gpt":0.2343440078441919,"score_spread":0.22304346088734445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309708571","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008674487,0.0003055921,0.9869986,0.0001401433,0.00007017889,0.00005222588,0.000023220136,0.00021303496,0.0035225102],"genre_scores_gemma":[0.39578664,0.0005212627,0.5954629,0.0002553995,0.0001027773,0.0004901019,0.00017819433,0.00016108251,0.0070415954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998149,0.000043733606,0.000011305267,0.000044919292,0.00005769528,0.000027443899],"domain_scores_gemma":[0.99983346,0.000077848534,0.000022121965,0.0000096111635,0.00004338042,0.00001346793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045041624,0.0007864314,0.00093978,0.00054538454,0.00046705015,0.0007067453,0.0010497046,0.0009784689,0.0025971553],"category_scores_gemma":[0.0006600655,0.00039068915,0.0010015549,0.0005478964,0.00040336116,0.0006360612,0.00074916513,0.0007394711,0.0003650773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053132902,0.000045427394,0.0004448492,0.000074214615,0.000044891985,0.00006518982,0.000029961773,0.9469329,0.0029570942,0.005278183,0.0011544455,0.04291966],"study_design_scores_gemma":[0.0000070396536,0.000011179625,0.000032545006,0.0000027332703,0.0000037921868,0.0000074231552,0.0000030603876,0.99896216,0.00017014645,0.00041259406,0.0003851999,0.0000021264655],"about_ca_topic_score_codex":0.003929029,"about_ca_topic_score_gemma":0.0033033327,"teacher_disagreement_score":0.003929029,"about_ca_system_score_codex":0.0004197595,"about_ca_system_score_gemma":0.0010286239,"threshold_uncertainty_score":0.008688331},"labels":[],"label_agreement":null},{"id":"W4309760235","doi":"10.1049/stg2.12095","title":"Evolution of smart grids towards the Internet of energy: Concept and essential components for deep decarbonisation","year":2022,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":222,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Interoperability; Computer science; Smart grid; The Internet; Greenhouse gas; Energy consumption; World Wide Web; Engineering; Electrical engineering","score_opus":0.011049292196158094,"score_gpt":0.20212882473808133,"score_spread":0.19107953254192322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309760235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0976234,0.10677804,0.37811467,0.05834465,0.0030352054,0.00029338285,0.00035212995,0.00067014236,0.3547884],"genre_scores_gemma":[0.82746756,0.061519526,0.081104346,0.002558773,0.0010373458,0.00021659116,0.00014471186,0.00008077882,0.025870383],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995732,0.00014538765,0.000021672024,0.00005034578,0.00016565183,0.00004376458],"domain_scores_gemma":[0.99965525,0.0001110813,0.000043244978,0.000048378715,0.000103350045,0.000038713566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007144357,0.00032318928,0.00023253802,0.00084589084,0.000381397,0.0025860462,0.00040324082,0.001267577,0.0016385027],"category_scores_gemma":[0.0005269834,0.00021692057,0.00031285553,0.0011143247,0.0019709105,0.0044561997,0.0012568664,0.0016359946,0.0003206958],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018167442,0.000036959576,0.0006482245,0.00022527047,0.000012124977,0.00014403622,0.00018551426,0.005632326,0.0015826565,0.93900543,0.0036867207,0.04882252],"study_design_scores_gemma":[0.000013296112,0.000110157445,0.0015077747,0.0005416426,0.0000210449,0.00049893575,0.00067957747,0.031831343,0.0036036232,0.6267707,0.33437613,0.000045782886],"about_ca_topic_score_codex":0.00077496073,"about_ca_topic_score_gemma":0.0006143908,"teacher_disagreement_score":0.0025860462,"about_ca_system_score_codex":0.0013062349,"about_ca_system_score_gemma":0.00087109004,"threshold_uncertainty_score":0.009477437},"labels":[],"label_agreement":null},{"id":"W4310521395","doi":"10.1109/ecce50734.2022.9948154","title":"A Multi-Parameter Approach to Optimal Power Dispatch in Grid-Connected Photovoltaic-Battery Systems","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Energy Conversion Congress and Exposition (ECCE)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; Carleton University","funders":"","keywords":"Photovoltaic system; Tariff; Computer science; Profit (economics); Stand-alone power system; Grid-connected photovoltaic power system; Grid; Battery (electricity); Electricity; Electric power system; Electricity pricing; Grid parity; Automotive engineering; Mathematical optimization; Power (physics); Maximum power point tracking; Renewable energy; Distributed generation; Engineering; Electricity market; Electrical engineering; Photovoltaics; Business; Economics; Mathematics; Microeconomics; Voltage","score_opus":0.008902420368573763,"score_gpt":0.1893032252704862,"score_spread":0.18040080490191246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310521395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014292575,0.00041103087,0.9796211,0.00028726613,0.000099538745,0.00006656579,0.00006494291,0.0001099132,0.005047083],"genre_scores_gemma":[0.8618429,0.0004505615,0.13256697,0.000113625545,0.00014206606,0.00020696508,0.00009131514,0.00014796658,0.004437622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928695,0.000352143,0.000036837548,0.0001177187,0.00013961137,0.00006684497],"domain_scores_gemma":[0.9991547,0.000559777,0.000102587124,0.000030084977,0.00010476342,0.000048126163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001535445,0.0014522502,0.0018941406,0.00086427375,0.00077195687,0.00206809,0.001550303,0.0015724555,0.0029240488],"category_scores_gemma":[0.003210448,0.0012182565,0.00086464325,0.0010888947,0.0008083739,0.0016327673,0.0009134571,0.0018216823,0.00032157908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012743083,0.00000875725,0.00005327269,0.000014767046,0.000016495795,0.000022302103,0.000012912824,0.99374384,0.000103207414,0.0027907852,0.00013233922,0.003088624],"study_design_scores_gemma":[0.0000039544425,0.0000065475942,0.000020841973,0.0000021108265,0.0000023177943,0.000003989656,0.000006344391,0.9978071,0.00003435055,0.001981338,0.00012795365,0.00000306421],"about_ca_topic_score_codex":0.006372972,"about_ca_topic_score_gemma":0.006862344,"teacher_disagreement_score":0.006372972,"about_ca_system_score_codex":0.00155129,"about_ca_system_score_gemma":0.0011570657,"threshold_uncertainty_score":0.012671709},"labels":[],"label_agreement":null},{"id":"W4310584278","doi":"10.1109/smartgridcomm52983.2022.9961058","title":"PEMT-CoSim: A Co-Simulation Platform for Packetized Energy Management and Trading in Distributed Energy Systems","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed generation; Smart grid; Computer science; Energy management; Distributed computing; Energy management system; Network packet; Co-simulation; Electricity; Energy (signal processing); Embedded system; Renewable energy; Engineering; Computer network; Electrical engineering","score_opus":0.014776388784406323,"score_gpt":0.2142238404722889,"score_spread":0.19944745168788258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310584278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032483067,0.00024367715,0.9329434,0.0004095503,0.00039220977,0.0003106159,0.0012384545,0.015024696,0.016954267],"genre_scores_gemma":[0.61407334,0.00069690036,0.3667671,0.00031748437,0.00009968019,0.001447079,0.003965485,0.002859483,0.00977352],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996019,0.00012557271,0.000032751726,0.00005751375,0.00012352169,0.000058642236],"domain_scores_gemma":[0.99922264,0.00034505635,0.00006089198,0.00010242644,0.00017968172,0.00008934083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008702513,0.0010344869,0.0008664519,0.00057811046,0.0005884977,0.0010643202,0.00201707,0.0012171685,0.0078107878],"category_scores_gemma":[0.002098137,0.000485336,0.001161614,0.00048936636,0.0004932134,0.0011195719,0.0014620195,0.0018930221,0.0010749998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017240604,0.00015323191,0.0016478571,0.00017194744,0.00010031758,0.00012649829,0.00010573057,0.9564087,0.0041524763,0.014617199,0.0053520645,0.016991697],"study_design_scores_gemma":[0.000026918782,0.000018878272,0.00007359294,0.0000054499724,0.0000091258535,0.000011062121,0.0000060751017,0.9932099,0.0014368709,0.0012410007,0.0039529516,0.000008198936],"about_ca_topic_score_codex":0.008336354,"about_ca_topic_score_gemma":0.0068519632,"teacher_disagreement_score":0.008336354,"about_ca_system_score_codex":0.0006442146,"about_ca_system_score_gemma":0.0017392121,"threshold_uncertainty_score":0.026129723},"labels":[],"label_agreement":null},{"id":"W4310870095","doi":"10.18280/ijsdp.170701","title":"Digital Platforms for Renewable Energy Communities Projects: An Overview","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Politecnico di Torino","keywords":"Renewable energy; Energy policy; Directive; Environmental economics; Flexibility (engineering); Legislation; Legislature; European union; Work (physics); Energy consumption; Energy transition; Nuclear decommissioning; Energy engineering; Engineering; Business; Economics; Political science; Computer science; Economic policy; Law; Management","score_opus":0.033909613470548876,"score_gpt":0.24958918481096956,"score_spread":0.21567957134042068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310870095","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30865178,0.17255478,0.1731498,0.0070425537,0.0008534398,0.004274461,0.006378389,0.0062548504,0.32084003],"genre_scores_gemma":[0.5755828,0.15612665,0.21928003,0.0009087975,0.00054126815,0.0033578856,0.009355861,0.0011408814,0.03370576],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.993786,0.0020585996,0.00047194827,0.00047657633,0.0026327604,0.00057416083],"domain_scores_gemma":[0.9923597,0.0041208505,0.00081181666,0.0007406462,0.0013210454,0.00064596575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005004423,0.0009916301,0.0004496291,0.016698344,0.0014039843,0.0076180617,0.0011187323,0.001523322,0.005303872],"category_scores_gemma":[0.0072331335,0.00059749704,0.0008208155,0.015932979,0.0010912805,0.008465632,0.004776793,0.0010643692,0.0024321724],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019022287,0.00046526958,0.012902992,0.0039580083,0.00005026258,0.0004425656,0.0034022199,0.0017657748,0.002738734,0.038116254,0.009602365,0.9263654],"study_design_scores_gemma":[0.00004540856,0.0003954255,0.03338383,0.005964928,0.00012462151,0.0022698685,0.010385909,0.0068297316,0.007192572,0.017612118,0.91565967,0.00013598808],"about_ca_topic_score_codex":0.0016977473,"about_ca_topic_score_gemma":0.001546524,"teacher_disagreement_score":0.016698344,"about_ca_system_score_codex":0.0016617815,"about_ca_system_score_gemma":0.0030184945,"threshold_uncertainty_score":0.02646625},"labels":[],"label_agreement":null},{"id":"W4311132172","doi":"10.3390/s22249631","title":"Design and Implementation of an Open-Source SCADA System for a Community Solar-Powered Reverse Osmosis System","year":2022,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Open source; Reverse osmosis; SCADA; Embedded system; Computer science; Engineering; Photovoltaic system; Environmental science; Operating system; Systems engineering; Process engineering; Electrical engineering; Chemistry; Software; Membrane","score_opus":0.023660585038036086,"score_gpt":0.24762801943340762,"score_spread":0.22396743439537153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311132172","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066469535,0.00019190078,0.8941877,0.00032070433,0.00020311776,0.0014067014,0.00028279988,0.021515964,0.0154216755],"genre_scores_gemma":[0.7057083,0.00017623123,0.2739799,0.00018567525,0.00008469136,0.0011210375,0.0007871186,0.0005224722,0.017434446],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99899966,0.00013925506,0.00009013218,0.00020773732,0.00046794262,0.00009526912],"domain_scores_gemma":[0.9989667,0.00008486038,0.0000977709,0.00014297912,0.0005827717,0.00012493764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007245091,0.00062498916,0.0005675448,0.00068852864,0.0004932513,0.0010511841,0.0017757152,0.0006815951,0.0059535913],"category_scores_gemma":[0.00096933806,0.00030757207,0.0003408845,0.0002952244,0.0003065694,0.0007941274,0.000680664,0.0006157541,0.0024482661],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00081614533,0.0011949545,0.015731275,0.00094067253,0.00023191996,0.002130523,0.0014890196,0.091662906,0.25062248,0.01591591,0.025207313,0.59405696],"study_design_scores_gemma":[0.0005225595,0.002135734,0.012901528,0.00017472362,0.00022416735,0.0013132371,0.0002830408,0.6479466,0.14186342,0.0033872258,0.1890022,0.0002457078],"about_ca_topic_score_codex":0.0015457128,"about_ca_topic_score_gemma":0.00092970027,"teacher_disagreement_score":0.0059535913,"about_ca_system_score_codex":0.0005225836,"about_ca_system_score_gemma":0.001145604,"threshold_uncertainty_score":0.019916713},"labels":[],"label_agreement":null},{"id":"W4311681040","doi":"10.22215/etd/2022-15188","title":"Vulnerability Assessment of Machine Learning Based Short-Term Residential Load Forecast against Cyber Attacks on Smart Meters","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Nonlinear autoregressive exogenous model; Support vector machine; Machine learning; Decision tree; Computer science; Artificial intelligence; Term (time); Vulnerability (computing); Artificial neural network; Random forest; Smart grid; Long short term memory; Data mining; Engineering; Recurrent neural network; Computer security","score_opus":0.015662721897275265,"score_gpt":0.2801262334600096,"score_spread":0.26446351156273434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311681040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9732711,0.0003215955,0.023048414,0.0003535987,0.00005653973,0.000026276295,0.0004628778,0.00038623193,0.002073436],"genre_scores_gemma":[0.9974058,0.00011185433,0.001741342,0.000013348703,0.000009104813,0.000007214785,0.00037228194,0.000008388059,0.00033065325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961156,0.00010215242,0.00003583911,0.00007102421,0.00013219556,0.000047241538],"domain_scores_gemma":[0.99779165,0.0012765318,0.00027883748,0.00019414452,0.00039073086,0.00006816466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010567231,0.00049895496,0.00034227892,0.00071587344,0.00020675438,0.000521653,0.0003340247,0.00048377088,0.0006241526],"category_scores_gemma":[0.0041732136,0.000120827055,0.0003236675,0.0005455857,0.00022300858,0.001021256,0.00047988378,0.0006325645,0.00022819491],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006294845,0.00015413431,0.05670758,0.00012300008,0.00016889737,0.00026616862,0.00014955873,0.8429305,0.0055509843,0.0010438114,0.0021444007,0.09013157],"study_design_scores_gemma":[0.0000028590812,0.000087795415,0.013926371,0.000010522241,0.000015050596,0.000032868506,0.000051868603,0.9822856,0.0030175433,0.00035507636,0.00020500133,0.000009358969],"about_ca_topic_score_codex":0.00567617,"about_ca_topic_score_gemma":0.0030484188,"teacher_disagreement_score":0.00567617,"about_ca_system_score_codex":0.0004840481,"about_ca_system_score_gemma":0.00034135557,"threshold_uncertainty_score":0.011286259},"labels":[],"label_agreement":null},{"id":"W4312261981","doi":"10.1109/pesgm48719.2022.9917077","title":"Behind-the-Meter Solar Generation Disaggregation via Universal Adaptive Stabilization","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Computer science; Electricity generation; Metre; Hidden Markov model; Power (physics); Control engineering; Real-time computing; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.015751081061584956,"score_gpt":0.201110337774893,"score_spread":0.18535925671330805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312261981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21744668,0.0007444192,0.76957583,0.00039892955,0.00018237505,0.00006704188,0.003272687,0.004578376,0.003733739],"genre_scores_gemma":[0.89097387,0.00016139758,0.100806974,0.0000766285,0.00008250224,0.00006160786,0.0054313634,0.00012992688,0.0022757768],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998053,0.00003991228,0.000008711555,0.000093160445,0.000028645987,0.000024359342],"domain_scores_gemma":[0.9997726,0.00006347647,0.000031147392,0.00006299667,0.000057366946,0.000012537868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033137243,0.0005041225,0.00048268496,0.00053931173,0.00023414096,0.00035996648,0.00065506174,0.0003261748,0.0007715891],"category_scores_gemma":[0.0008972829,0.0001521666,0.00046228245,0.0006380581,0.00017911062,0.00046917232,0.00055352756,0.0005557047,0.00040973164],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043276296,0.00021026183,0.014720389,0.00011605229,0.000180455,0.00016720408,0.00021424801,0.492833,0.017968973,0.0036773607,0.013782477,0.45569685],"study_design_scores_gemma":[0.0000069548146,0.00001470869,0.0017202452,0.0000037249308,0.000006942628,0.000011946296,0.000016849255,0.9940036,0.0017166077,0.001184304,0.0013081438,0.000005919967],"about_ca_topic_score_codex":0.010712243,"about_ca_topic_score_gemma":0.023618007,"teacher_disagreement_score":0.010712243,"about_ca_system_score_codex":0.00034724383,"about_ca_system_score_gemma":0.00049704197,"threshold_uncertainty_score":0.02129978},"labels":[],"label_agreement":null},{"id":"W4312338959","doi":"10.1109/iscc55528.2022.9912852","title":"A Federated Learning Model With Short Sequence To Point Mechanism For Smart Home Energy Disaggregation","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Symposium on Computers and Communications (ISCC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Energy consumption; Server; Computer security; Residence; Consumption (sociology); Home automation; Electricity; Point (geometry); Computer network; Telecommunications; Engineering","score_opus":0.018550706309554407,"score_gpt":0.21948053651404828,"score_spread":0.20092983020449387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312338959","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04392481,0.00026960502,0.95130193,0.00032650534,0.00006908595,0.000060463575,0.00013066523,0.0022685318,0.0016483973],"genre_scores_gemma":[0.92576945,0.000105317595,0.070502706,0.00020683327,0.000028574706,0.000104572275,0.00021760965,0.000037323996,0.003027595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951446,0.00012241714,0.000033177614,0.0001661707,0.00008746299,0.00007631721],"domain_scores_gemma":[0.9993586,0.00022104892,0.00006716436,0.00011691374,0.00019781258,0.00003848382],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015962601,0.00052907615,0.0009348544,0.00039216457,0.0004955794,0.0007447806,0.0015933097,0.001033521,0.0020146796],"category_scores_gemma":[0.0022821147,0.00023937876,0.000666237,0.00048175512,0.0005650147,0.001660313,0.0011941992,0.0011648434,0.00044715175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002648122,0.00019414823,0.001988129,0.000036503905,0.000051806568,0.00009165484,0.00007967113,0.87038815,0.0017333196,0.0058916546,0.0020728805,0.1172072],"study_design_scores_gemma":[0.0000051210063,0.000021303127,0.000074765136,0.0000015746193,0.000003973377,0.0000072301495,0.0000029441703,0.99782795,0.00029975784,0.0015853213,0.00016739403,0.0000027253025],"about_ca_topic_score_codex":0.008856559,"about_ca_topic_score_gemma":0.00770321,"teacher_disagreement_score":0.008856559,"about_ca_system_score_codex":0.0009251346,"about_ca_system_score_gemma":0.0010042035,"threshold_uncertainty_score":0.017610013},"labels":[],"label_agreement":null},{"id":"W4312469297","doi":"10.1109/access.2022.3215954","title":"A Computationally Efficient Method for Energy Allocation in Spot Markets With Application to Transactive Energy Systems","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Transactive memory; Computer science; Energy (signal processing); Knowledge management; Mathematics; Statistics","score_opus":0.00887655042569164,"score_gpt":0.24860413228910228,"score_spread":0.23972758186341064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312469297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023259395,0.00007027126,0.99564064,0.00006975772,0.000028673923,0.000031348525,0.000011916818,0.00009080032,0.0017307017],"genre_scores_gemma":[0.30332464,0.0003230952,0.68725055,0.00010472284,0.00006893167,0.00039171477,0.0000784275,0.0001597585,0.008298179],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997373,0.00008922052,0.000012757034,0.000030021502,0.000105523824,0.000025158171],"domain_scores_gemma":[0.99967086,0.00017099683,0.000027704838,0.000030351448,0.000084178464,0.000015998681],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079684384,0.0006698575,0.0006650504,0.0005126174,0.0006009354,0.0007510612,0.0008402009,0.00073813164,0.0044193245],"category_scores_gemma":[0.0015136581,0.00034383795,0.00057888933,0.0006749922,0.00056067656,0.0009488301,0.00076244643,0.0010778455,0.0006458357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047126305,0.00004641931,0.00023974036,0.00007141592,0.000023675135,0.00009000309,0.000061001785,0.90744835,0.0027610583,0.030842628,0.0015522981,0.056816246],"study_design_scores_gemma":[0.0000030840506,0.0000049744513,0.00001392121,0.0000014181512,9.2686753e-7,0.0000066542793,0.000003188033,0.9980198,0.00013116155,0.0014087124,0.00040466446,0.0000015018227],"about_ca_topic_score_codex":0.005098183,"about_ca_topic_score_gemma":0.006706611,"teacher_disagreement_score":0.005098183,"about_ca_system_score_codex":0.00057633646,"about_ca_system_score_gemma":0.0012830531,"threshold_uncertainty_score":0.014784098},"labels":[],"label_agreement":null},{"id":"W4312568251","doi":"10.1109/pesgm48719.2022.9917106","title":"Peer-to-Peer Energy Trading in Smart Grid Considering Power Losses and Network Fees","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Clearing; Peer-to-peer; Market clearing; Smart grid; Grid; Computer science; Electricity market; Electricity; Environmental economics; Energy market; Distributed generation; Business; Industrial organization; Microeconomics; Distributed computing; Renewable energy; Finance; Economics; Electrical engineering","score_opus":0.013305499285417707,"score_gpt":0.218062308723323,"score_spread":0.20475680943790528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312568251","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16163364,0.0007751013,0.8219767,0.0005568297,0.0000883224,0.0001310663,0.000050730363,0.0003108898,0.014476636],"genre_scores_gemma":[0.9878906,0.00013273375,0.0105586015,0.000021352489,0.000019596873,0.000027792963,0.000011801122,0.000018925954,0.0013186729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858046,0.0005727551,0.00005098926,0.00020119119,0.0004227136,0.00017193407],"domain_scores_gemma":[0.9986247,0.0008038247,0.0001683779,0.00010666637,0.00022256044,0.00007389874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012410589,0.0005461312,0.0015977549,0.0003873077,0.0009339049,0.0018160975,0.0013173837,0.0011506524,0.0015356694],"category_scores_gemma":[0.003796356,0.00036369843,0.00043924816,0.00070317055,0.001041003,0.0034226682,0.0011502365,0.0008541494,0.00015006574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075541146,0.00004057243,0.0005573944,0.00003727982,0.00001979046,0.00032390657,0.00004373633,0.9539358,0.001090292,0.03156792,0.0005338802,0.011773968],"study_design_scores_gemma":[0.0000065395884,0.000012772781,0.00008383943,0.0000012093388,0.000004068418,0.00003926729,0.000012342128,0.992466,0.00018727909,0.007004867,0.00017753005,0.0000043724417],"about_ca_topic_score_codex":0.0049052658,"about_ca_topic_score_gemma":0.0039296807,"teacher_disagreement_score":0.0049052658,"about_ca_system_score_codex":0.0014139035,"about_ca_system_score_gemma":0.0013906937,"threshold_uncertainty_score":0.010258615},"labels":[],"label_agreement":null},{"id":"W4313024944","doi":"10.1109/pesgm48719.2022.9916720","title":"LMP-Based Day-Ahead Electricity Market Design Considering the Participation of DR and BESS","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity market; Renewable energy; Electricity; Grid; Computer science; Settlement (finance); Integer programming; Reliability engineering; Electric power system; Operations research; Environmental economics; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.02323801296313731,"score_gpt":0.23144847297005572,"score_spread":0.2082104600069184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313024944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034584843,0.00019860339,0.94880456,0.00037879348,0.000060889797,0.00020859895,0.00019110269,0.00025896193,0.015313563],"genre_scores_gemma":[0.9359121,0.00014844141,0.058119383,0.000093064904,0.000035293215,0.00023366523,0.000117008734,0.0000934018,0.005247715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994147,0.00026343373,0.000016791264,0.000096083975,0.00011020958,0.000098868324],"domain_scores_gemma":[0.999302,0.00038685737,0.000093469964,0.000020237869,0.00013643577,0.00006094551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012434822,0.001029569,0.0013406492,0.00042659178,0.00044068904,0.0016872463,0.0018618044,0.0015322289,0.0070179203],"category_scores_gemma":[0.0019171834,0.00085766526,0.00071503647,0.00047345518,0.0005859254,0.001287706,0.0010683775,0.0013135368,0.00047988878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031561518,0.000024037885,0.000108082786,0.000032528966,0.000012861339,0.000063596846,0.000014105562,0.9888995,0.0005314537,0.005965212,0.0003823069,0.0039346977],"study_design_scores_gemma":[0.00000472665,0.0000149114885,0.000020849648,0.0000010384924,0.0000024329618,0.0000063135185,0.0000054382194,0.9988563,0.00007348532,0.00089374534,0.000118797434,0.0000019839254],"about_ca_topic_score_codex":0.0039280234,"about_ca_topic_score_gemma":0.00573797,"teacher_disagreement_score":0.0070179203,"about_ca_system_score_codex":0.0012268224,"about_ca_system_score_gemma":0.0016301877,"threshold_uncertainty_score":0.023477256},"labels":[],"label_agreement":null},{"id":"W4313315997","doi":"10.1109/ibcast54850.2022.9990113","title":"Flexibility based Coordination Framework For Three-Level Energy Management System","year":2022,"lang":"en","type":"article","venue":"2022 19th International Bhurban Conference on Applied Sciences and Technology (IBCAST)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Flexibility (engineering); Computer science; Energy management; Systems engineering; Embedded system; Process management; Energy (signal processing); Business; Engineering","score_opus":0.03695857067283527,"score_gpt":0.24659192765909904,"score_spread":0.20963335698626379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313315997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011546628,0.00023597984,0.9778049,0.0002276749,0.000048788486,0.000091559414,0.00007136587,0.00027175623,0.009701306],"genre_scores_gemma":[0.8782272,0.0002930479,0.117429756,0.000076915814,0.000053412034,0.00023410632,0.000119722026,0.000041979598,0.0035239188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992329,0.00023858524,0.00004603513,0.00016266438,0.00018196728,0.00013793606],"domain_scores_gemma":[0.99976856,0.00006600558,0.000043857082,0.000023728107,0.000059363647,0.000038478098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010855477,0.0007040939,0.0005695837,0.0004489633,0.00068140094,0.0015934175,0.0011262993,0.00076881953,0.0041708346],"category_scores_gemma":[0.0007209916,0.00022876282,0.0008582571,0.00046176167,0.00069083803,0.0009154449,0.001406799,0.0008129489,0.0004117882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008430284,0.00004129132,0.00045522815,0.000072034774,0.00004875237,0.0003297055,0.00016702234,0.86646926,0.003394396,0.100285195,0.0015692228,0.027083524],"study_design_scores_gemma":[0.000018335357,0.00004658127,0.00010248608,0.000007964193,0.000011286201,0.000042242344,0.00003057492,0.9827572,0.00037296573,0.014490145,0.0021092207,0.0000110172305],"about_ca_topic_score_codex":0.006224495,"about_ca_topic_score_gemma":0.0048798406,"teacher_disagreement_score":0.006224495,"about_ca_system_score_codex":0.0011634557,"about_ca_system_score_gemma":0.0013778514,"threshold_uncertainty_score":0.013952851},"labels":[],"label_agreement":null},{"id":"W4313388699","doi":"10.3390/en16010472","title":"A State-of-the-Art Review of Smart Energy Systems and Their Management in a Smart Grid Environment","year":2023,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Smart grid; Distributed generation; Electricity; Energy management system; Computer science; Grid; Demand response; Automation; Electric power system; Energy management; Distributed computing; Engineering; Renewable energy; Electrical engineering; Energy (signal processing); Power (physics)","score_opus":0.019951738586446836,"score_gpt":0.22278384285322242,"score_spread":0.2028321042667756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313388699","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00028341907,0.9950949,0.00043462001,0.00052700227,0.0003202069,0.000008677984,0.000054797765,0.000013276156,0.0032630635],"genre_scores_gemma":[0.0013085124,0.9972084,0.00034366298,0.00024329078,0.00017781532,0.000006359309,0.00005944956,0.0000023979978,0.00065006147],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996618,0.000056490742,0.000055163717,0.00006166012,0.00013404866,0.000030861698],"domain_scores_gemma":[0.99905926,0.00052575994,0.0001148965,0.00003071453,0.00022807487,0.000041223964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006209346,0.0007867976,0.00097189227,0.0029979085,0.00036517027,0.0012962451,0.0006972336,0.0009616953,0.0062312945],"category_scores_gemma":[0.0014570598,0.0003344233,0.0006024055,0.00598563,0.00035847834,0.0020609421,0.0005933583,0.0011304041,0.0021384605],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045328314,0.000077758334,0.00047246163,0.043046355,0.00010618618,0.00021176675,0.0001761518,0.0007172905,0.0017137728,0.01018319,0.049428515,0.8938211],"study_design_scores_gemma":[0.0000035226908,0.000058074067,0.0010445385,0.007840467,0.00014604664,0.0006176081,0.00011121287,0.00014475954,0.00035590015,0.0024792156,0.9871783,0.000020413405],"about_ca_topic_score_codex":0.0013491779,"about_ca_topic_score_gemma":0.0028003638,"teacher_disagreement_score":0.0062312945,"about_ca_system_score_codex":0.00055097206,"about_ca_system_score_gemma":0.0018799315,"threshold_uncertainty_score":0.02084583},"labels":[],"label_agreement":null},{"id":"W4313484354","doi":"10.1109/tnnls.2022.3232630","title":"Federated Multiagent Deep Reinforcement Learning Approach via Physics-Informed Reward for Multimicrogrid Energy Management","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Neural Networks and Learning Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"National Natural Science Foundation of China","keywords":"Reinforcement learning; Reinforcement; Computer science; Energy (signal processing); Artificial intelligence; Psychology; Physics; Social psychology","score_opus":0.013597054239743256,"score_gpt":0.20906301034681374,"score_spread":0.1954659561070705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313484354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05734464,0.00053616316,0.9357994,0.0005826027,0.00009717345,0.00005683541,0.000051892945,0.0005699171,0.0049614143],"genre_scores_gemma":[0.96985126,0.0001070105,0.027637145,0.00015076356,0.000025146175,0.00007079064,0.00004754553,0.0000299839,0.0020805462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999634,0.00010410738,0.000018574681,0.000086362226,0.00007353412,0.00008332967],"domain_scores_gemma":[0.9993261,0.00032313503,0.00010966868,0.000049923783,0.00012364058,0.00006745417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000928656,0.0007372554,0.0009795732,0.00027999465,0.00041211318,0.0008822045,0.0011439481,0.0008749523,0.0018530153],"category_scores_gemma":[0.002179151,0.00034946142,0.00044943538,0.00024648255,0.0007067174,0.000813784,0.0012639975,0.0012769264,0.00018774175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006141367,0.000049069036,0.0007996135,0.000034398116,0.000032558597,0.00008666038,0.000041295414,0.9746994,0.00079431146,0.005916861,0.0006339764,0.0168505],"study_design_scores_gemma":[0.000005351738,0.0000133211815,0.0000436437,0.0000018636066,0.000003584359,0.000004359368,0.0000030546958,0.99818027,0.00007676609,0.0015528257,0.000113075184,0.0000018878989],"about_ca_topic_score_codex":0.007650488,"about_ca_topic_score_gemma":0.0060626403,"teacher_disagreement_score":0.007650488,"about_ca_system_score_codex":0.0008168813,"about_ca_system_score_gemma":0.0012186093,"threshold_uncertainty_score":0.01521194},"labels":[],"label_agreement":null},{"id":"W4313646566","doi":"10.3390/electronics12020287","title":"Blockchain-Based Peer-to-Peer Energy Trading System Using Open-Source Angular Framework and Hypertext Transfer Protocol","year":2023,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Memorial University of Newfoundland","funders":"","keywords":"Computer science; Blockchain; Computer security; Smart contract; Peer-to-peer; Server; The Internet; Hypertext Transfer Protocol; Computer network; Operating system","score_opus":0.015968091220227302,"score_gpt":0.24488626805448127,"score_spread":0.22891817683425397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313646566","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07141223,0.00053358136,0.8721799,0.00047980182,0.00015062801,0.0015315906,0.00052997406,0.020051364,0.03313102],"genre_scores_gemma":[0.8496476,0.00038428957,0.12974535,0.00014238758,0.000056065575,0.00095551985,0.0010753244,0.00026175624,0.017731696],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991972,0.00015520916,0.00007750691,0.00015183107,0.00029518735,0.00012305452],"domain_scores_gemma":[0.99950266,0.00012420588,0.000055937973,0.00010925302,0.00011238308,0.000095619085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007260383,0.00047961166,0.00078186434,0.00058437634,0.0010883367,0.0014257942,0.0017162821,0.00090039225,0.010516208],"category_scores_gemma":[0.0011835254,0.00027186287,0.00039559064,0.00055159285,0.00063528324,0.0017174557,0.0022327823,0.00058865425,0.0022913194],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024814,0.0016188254,0.0050123963,0.001336384,0.00023755502,0.004782734,0.001260639,0.33959785,0.07411631,0.102624975,0.02924901,0.4376819],"study_design_scores_gemma":[0.00040808576,0.0003564488,0.00072209386,0.000045442688,0.000050917963,0.00048401853,0.000111670895,0.9266094,0.02135881,0.016373659,0.033400867,0.000078517245],"about_ca_topic_score_codex":0.0031585237,"about_ca_topic_score_gemma":0.0029748613,"teacher_disagreement_score":0.010516208,"about_ca_system_score_codex":0.0005487179,"about_ca_system_score_gemma":0.0014430047,"threshold_uncertainty_score":0.03518021},"labels":[],"label_agreement":null},{"id":"W4316663540","doi":"10.3390/en16021000","title":"Optimal Management of a Virtual Power Plant Consisting of Renewable Energy Resources and Electric Vehicles Using Mixed-Integer Linear Programming and Deep Learning","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Virtual power plant; Computer science; Benchmark (surveying); Renewable energy; Distributed generation; Energy management; Demand response; Grid; Artificial neural network; Smart grid; Electricity; Distributed computing; Automotive engineering; Mathematical optimization; Engineering; Energy (signal processing); Artificial intelligence; Electrical engineering","score_opus":0.008553499071186894,"score_gpt":0.19789795070945604,"score_spread":0.18934445163826916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4316663540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09801314,0.00089909625,0.89281154,0.0006808698,0.00010199338,0.00006714319,0.00011295303,0.0007032994,0.006610035],"genre_scores_gemma":[0.9473379,0.00022722242,0.0493946,0.00016856984,0.00003538876,0.00010518986,0.00013641988,0.00005031167,0.0025443651],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998017,0.000044127297,0.000009793164,0.000057951875,0.000034909033,0.000051543913],"domain_scores_gemma":[0.99958676,0.00024410816,0.000055809563,0.000014058161,0.00006502511,0.00003430061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006075638,0.0011544329,0.0008514796,0.00033972418,0.00037644006,0.0010975893,0.0007725485,0.00114829,0.0016663546],"category_scores_gemma":[0.0010099289,0.0005946182,0.0006822713,0.0003241712,0.0005465158,0.0009696475,0.0008455789,0.0014455126,0.00017937638],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024454712,0.000026867061,0.0002245282,0.00002379316,0.000015099497,0.000031253516,0.000011129468,0.988593,0.00043211677,0.0009635592,0.00024937885,0.009404851],"study_design_scores_gemma":[0.0000012565084,0.000004783911,0.000014286209,8.6453576e-7,0.0000014396575,0.0000010583244,0.0000014814498,0.999647,0.00005540569,0.00024653407,0.000025164463,6.693407e-7],"about_ca_topic_score_codex":0.012070542,"about_ca_topic_score_gemma":0.012599954,"teacher_disagreement_score":0.012070542,"about_ca_system_score_codex":0.001016675,"about_ca_system_score_gemma":0.0017330749,"threshold_uncertainty_score":0.024000585},"labels":[],"label_agreement":null},{"id":"W4317521089","doi":"10.1016/j.ejor.2023.01.019","title":"Survey of optimization models for power system operation and expansion planning with demand response","year":2023,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Demand response; Grid; Electric power system; Power grid; Term (time); Operations research; Dynamic demand; Power flow; Mathematical optimization; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.09882129180671646,"score_gpt":0.3214608778252245,"score_spread":0.22263958601850803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317521089","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030083929,0.13151391,0.8330577,0.0023552794,0.00041777836,0.00009147872,0.0007279738,0.0002864014,0.028541135],"genre_scores_gemma":[0.16956985,0.48333323,0.32672682,0.0013400727,0.002650935,0.0006750707,0.0025015068,0.0005611483,0.012641393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"systematic_review","domain_scores_codex":[0.9990476,0.0004033986,0.00008425428,0.00012728533,0.0002724489,0.000064983215],"domain_scores_gemma":[0.9988959,0.00080731657,0.00007407823,0.00004956705,0.0001518393,0.00002129353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016887191,0.0023412537,0.0024344549,0.0011572139,0.00040978304,0.0022751365,0.0020080043,0.0013904679,0.0037799124],"category_scores_gemma":[0.0028056859,0.0010049625,0.0016761849,0.0040274174,0.00058824394,0.0018661213,0.0009402999,0.0023574254,0.0014942717],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050298368,0.00012428292,0.00071179174,0.0021231896,0.00015886722,0.00011342872,0.00008368265,0.7081766,0.00042277007,0.103927515,0.017425112,0.16668251],"study_design_scores_gemma":[0.000014826728,0.000054190692,0.00035923795,0.0005353105,0.0000678149,0.00010427595,0.000047638405,0.882203,0.00021055344,0.06728244,0.049092818,0.000027885699],"about_ca_topic_score_codex":0.005210114,"about_ca_topic_score_gemma":0.004711433,"teacher_disagreement_score":0.005210114,"about_ca_system_score_codex":0.0010821806,"about_ca_system_score_gemma":0.0017294885,"threshold_uncertainty_score":0.012645066},"labels":[],"label_agreement":null},{"id":"W4317619163","doi":"10.3390/en16031150","title":"Applying Energy Justice Principles to Renewable Energy Trading and Allocation in Multi-Unit Buildings","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Norges Forskningsråd","keywords":"Renewable energy; Environmental economics; Incentive; Unit (ring theory); Work (physics); Profit (economics); Energy consumption; Business; Energy storage; Economics; Microeconomics; Engineering; Power (physics); Electrical engineering","score_opus":0.03662233326452331,"score_gpt":0.2420871501321208,"score_spread":0.2054648168675975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317619163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064815484,0.00033534726,0.92878515,0.00034280727,0.00008066715,0.00008200924,0.000033845077,0.0002020686,0.0053225374],"genre_scores_gemma":[0.9372176,0.00015093377,0.06043425,0.00009922845,0.000044350163,0.00003947972,0.000024708914,0.000041938623,0.0019475318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99713504,0.0013679931,0.000110657755,0.00037209023,0.0006972561,0.00031689182],"domain_scores_gemma":[0.99698704,0.0016533412,0.00032565382,0.0005793626,0.00025633434,0.0001982072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003237874,0.00054090226,0.00091223815,0.0005317405,0.00096930494,0.002048981,0.0012468303,0.0009314371,0.0017435912],"category_scores_gemma":[0.0059387772,0.0002672562,0.00075059466,0.000695643,0.001124878,0.0030489264,0.0021701977,0.0011418173,0.00022865598],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004002396,0.00038770487,0.0028924607,0.00013839299,0.00012131336,0.00032306171,0.00034936832,0.7128409,0.0071474207,0.12973268,0.0017600268,0.14390647],"study_design_scores_gemma":[0.000013168039,0.000049184982,0.0003680728,0.000007149711,0.000015327916,0.000057650228,0.00005902952,0.95306593,0.0016716771,0.04349804,0.0011756162,0.000019198358],"about_ca_topic_score_codex":0.0023283672,"about_ca_topic_score_gemma":0.0031200766,"teacher_disagreement_score":0.003237874,"about_ca_system_score_codex":0.001090082,"about_ca_system_score_gemma":0.001083209,"threshold_uncertainty_score":0.0171237},"labels":[],"label_agreement":null},{"id":"W4317726571","doi":"10.3390/en16031182","title":"Heuristic Retailer’s Day-Ahead Pricing Based on Online-Learning of Prosumer’s Optimal Energy Management Model","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Prosumer; Demand response; Dynamic pricing; Heuristic; Computer science; Smart grid; Distributed generation; Key (lock); Business; Electricity; Marketing; Renewable energy; Computer security; Artificial intelligence","score_opus":0.01338292522863075,"score_gpt":0.21631928366550046,"score_spread":0.20293635843686972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317726571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19685116,0.0006273087,0.7758158,0.0012493202,0.00013545815,0.00026713425,0.00027618866,0.00039228538,0.024385426],"genre_scores_gemma":[0.98317885,0.00010500143,0.013359274,0.00007644803,0.000017014985,0.00009171664,0.000054128668,0.000017984285,0.0030995593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952745,0.00016485956,0.0000191073,0.00010070401,0.00008411599,0.00010380502],"domain_scores_gemma":[0.99861073,0.0008763715,0.00013214233,0.000059631348,0.00021359738,0.0001075671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013762697,0.0008658771,0.0019042342,0.0005675134,0.0006465791,0.0020772389,0.0015658387,0.0019472593,0.004172744],"category_scores_gemma":[0.0023760216,0.0006449048,0.00076578034,0.0005282389,0.001167018,0.0012258209,0.0010987573,0.0015508566,0.0002744701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023596162,0.000021833312,0.00016456516,0.000010229398,0.00000842541,0.00003680651,0.000012289966,0.9966156,0.00008640045,0.0016715821,0.0001525343,0.0011962339],"study_design_scores_gemma":[0.000003741341,0.0000058009227,0.000021679329,9.823781e-7,0.000002231412,0.0000023296118,0.0000034215066,0.9994916,0.000020559703,0.00041683202,0.000029293917,0.0000015592244],"about_ca_topic_score_codex":0.011990889,"about_ca_topic_score_gemma":0.010376497,"teacher_disagreement_score":0.011990889,"about_ca_system_score_codex":0.0015568228,"about_ca_system_score_gemma":0.0018657455,"threshold_uncertainty_score":0.023842156},"labels":[],"label_agreement":null},{"id":"W4317884076","doi":"10.1016/j.apenergy.2023.120690","title":"Corrigendum to “Online distributed optimization for spatio-temporally constrained real-time peer-to-peer energy trading” [Appl. Energy 331 (2023) 120216]","year":2023,"lang":"en","type":"erratum","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Peer-to-peer; Computer science; Energy (signal processing); Distributed computing; Physics","score_opus":0.014318383358867913,"score_gpt":0.21754290095975423,"score_spread":0.2032245176008863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317884076","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019087053,0.003431071,0.0054046856,0.050284043,0.9077975,0.00009346536,0.0022080417,0.0010410157,0.029549384],"genre_scores_gemma":[0.008133862,0.010173657,0.008060031,0.03802926,0.1288413,0.0002409647,0.005446013,0.0020789283,0.7989959],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99660957,0.0005107091,0.00027932585,0.0005239134,0.0018199072,0.00025672454],"domain_scores_gemma":[0.98956186,0.00218347,0.00026257223,0.00060369924,0.00699018,0.00039820542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021849286,0.0018804587,0.002235012,0.0027065498,0.0023403985,0.0038123582,0.0032684759,0.004844274,0.19301802],"category_scores_gemma":[0.020195384,0.00085841335,0.0017973038,0.0028526185,0.0013717506,0.002852503,0.0018951667,0.0052118986,0.10606456],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022247092,0.0000056418908,0.000020183415,0.000056870056,0.000005820684,0.000046042438,0.0000065518147,0.0001213766,0.00007095921,0.0010834069,0.994514,0.0040470697],"study_design_scores_gemma":[0.000031227475,0.000034681827,0.0004942139,0.00015607603,0.000023871233,0.00011525801,0.000035342164,0.0017035947,0.0004974905,0.004033622,0.9928248,0.000049705915],"about_ca_topic_score_codex":0.031209588,"about_ca_topic_score_gemma":0.048192088,"teacher_disagreement_score":0.19301802,"about_ca_system_score_codex":0.00447307,"about_ca_system_score_gemma":0.0024403748,"threshold_uncertainty_score":0.64570963},"labels":[],"label_agreement":null},{"id":"W4318015092","doi":"10.1016/j.scs.2023.104421","title":"How INVELOX can affect the perspective of renewable energy exploitation: Demand response and multilateral structure planning outlook","year":2023,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Microgrid; Renewable energy; Demand response; Solver; Mathematical optimization; Grid; Computer science; Turbine; Photovoltaic system; Electricity; Engineering; Mathematics; Electrical engineering","score_opus":0.007798513052142489,"score_gpt":0.20751819026534454,"score_spread":0.19971967721320205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318015092","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28243405,0.0009746412,0.0068040015,0.0469356,0.00035312734,0.000026647936,0.0003706132,0.000057239915,0.6620441],"genre_scores_gemma":[0.9760066,0.0003847673,0.00061848405,0.0012192096,0.00004686486,0.0000120314735,0.000057414116,0.00004039734,0.021614213],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990571,0.0003135685,0.000014829899,0.000076577344,0.00021051332,0.0003272556],"domain_scores_gemma":[0.9990491,0.0002863056,0.000101305275,0.00004602276,0.0002892562,0.00022787927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016425912,0.00021244632,0.00022299986,0.00033100744,0.0011775397,0.0062820353,0.0006522378,0.0015779629,0.018367507],"category_scores_gemma":[0.0039198436,0.00015816346,0.00033403648,0.0006102104,0.0011136036,0.004914753,0.0019632343,0.0025498364,0.0007394056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015005453,0.00012702006,0.006498592,0.000053630898,0.000032512467,0.00031822638,0.0014662417,0.012930823,0.0017528402,0.9372085,0.014612993,0.024848593],"study_design_scores_gemma":[0.00007058334,0.00016306574,0.021117022,0.0001836845,0.000053853535,0.00018965612,0.016493997,0.027563566,0.0030591409,0.7163384,0.21464665,0.00012035645],"about_ca_topic_score_codex":0.021713696,"about_ca_topic_score_gemma":0.038258776,"teacher_disagreement_score":0.021713696,"about_ca_system_score_codex":0.003413139,"about_ca_system_score_gemma":0.0026630727,"threshold_uncertainty_score":0.061445415},"labels":[],"label_agreement":null},{"id":"W4318261551","doi":"10.1016/b978-0-323-95108-1.00004-5","title":"Effects of an hourly tariff on the electricity power sector—the Honduran model","year":2023,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Tariff; Electricity; Consumption (sociology); Environmental economics; Electricity demand; Business; Economics; Outcome (game theory); Electricity generation; Natural resource economics; Power (physics); Operations management; Microeconomics; Engineering; International economics; Electrical engineering","score_opus":0.011271464296109944,"score_gpt":0.18653564148105226,"score_spread":0.1752641771849423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318261551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71625787,0.0022495147,0.019305423,0.0039116303,0.000501261,0.000113647984,0.002572655,0.00029059968,0.25479734],"genre_scores_gemma":[0.9586763,0.00069942366,0.0010068847,0.00018289719,0.00005222232,0.000025513582,0.00024022267,0.000074130214,0.03904254],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949884,0.00021567995,0.00001096582,0.00005238589,0.000038581908,0.00018346585],"domain_scores_gemma":[0.9986602,0.0007935771,0.0001457569,0.000080673824,0.00017632196,0.00014354313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010890311,0.001010687,0.0015555078,0.00060527824,0.0013333599,0.003445729,0.0020599107,0.002124963,0.012616927],"category_scores_gemma":[0.003200881,0.0007142672,0.0013775817,0.0011008689,0.0013566324,0.0025928728,0.0012297414,0.0022410857,0.0008323661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037305232,0.00016865986,0.0022626305,0.000059545153,0.00006702853,0.0003435777,0.000069365626,0.930466,0.00031605727,0.052757833,0.006273751,0.0068424735],"study_design_scores_gemma":[0.00011924101,0.00012988524,0.0014203441,0.000023970944,0.00009368693,0.000040070914,0.00018172999,0.9751569,0.0001767703,0.020143423,0.002475145,0.00003876694],"about_ca_topic_score_codex":0.23834746,"about_ca_topic_score_gemma":0.1729181,"teacher_disagreement_score":0.23834746,"about_ca_system_score_codex":0.004337729,"about_ca_system_score_gemma":0.0019655058,"threshold_uncertainty_score":0.4739203},"labels":[],"label_agreement":null},{"id":"W4318677213","doi":"10.1016/j.rser.2023.113161","title":"Energy management in microgrids using transactive energy control concept under high penetration of Renewables; A survey and case study","year":2023,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"","keywords":"Prosumer; Computer science; Renewable energy; TEC; Distributed computing; Energy management; Risk analysis (engineering); Distributed generation; Environmental economics; Process management; Systems engineering; Engineering; Energy (signal processing); Business; Economics","score_opus":0.01870397060326441,"score_gpt":0.24357003894152957,"score_spread":0.22486606833826517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318677213","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24927251,0.451928,0.18375976,0.0010058216,0.0003081027,0.00021583767,0.00014802793,0.0004074347,0.112954505],"genre_scores_gemma":[0.80314445,0.16935416,0.019710181,0.00010883083,0.0001614432,0.000043150307,0.00009530119,0.000027783733,0.0073547745],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99972004,0.00008639255,0.000022790065,0.000042210348,0.00009923127,0.00002935308],"domain_scores_gemma":[0.999764,0.0001316361,0.000030502504,0.00001716306,0.00004770796,0.000009005016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004110415,0.0004590687,0.00050859334,0.0006952516,0.00023796973,0.0013798224,0.00054995524,0.000558316,0.00082130526],"category_scores_gemma":[0.00043013372,0.00014240578,0.00031091415,0.0019003024,0.0003536004,0.0008939872,0.00031932138,0.000266831,0.0001991856],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020621589,0.00025635702,0.0039027336,0.0043439465,0.00010884519,0.001012137,0.00058889424,0.084212765,0.011620787,0.022941899,0.0033101842,0.86749506],"study_design_scores_gemma":[0.0000708423,0.003036771,0.024466982,0.0033284186,0.00054796983,0.0073240334,0.006795982,0.39059258,0.044271503,0.03040688,0.48894086,0.00021720599],"about_ca_topic_score_codex":0.001289607,"about_ca_topic_score_gemma":0.0015458709,"teacher_disagreement_score":0.0013798224,"about_ca_system_score_codex":0.00029962292,"about_ca_system_score_gemma":0.00029862818,"threshold_uncertainty_score":0.002747476},"labels":[],"label_agreement":null},{"id":"W4319319301","doi":"10.3390/en16031549","title":"Developing an Appropriate Energy Trading Algorithm and Techno-Economic Analysis between Peer-to-Peer within a Partly Independent Microgrid","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Prosumer; Microgrid; Profitability index; Peer-to-peer; Distributed generation; Computer science; Environmental economics; Profit (economics); Grid; Business; Distributed computing; Renewable energy; Economics; Microeconomics; Engineering","score_opus":0.017994023748854462,"score_gpt":0.23898274064992794,"score_spread":0.22098871690107347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319319301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045862067,0.00015967691,0.9448464,0.00024571145,0.00003796046,0.00018956442,0.000034276305,0.0001785495,0.008445834],"genre_scores_gemma":[0.8781899,0.00023023091,0.11767875,0.000045920016,0.000025858528,0.00023915878,0.000059271308,0.000048827653,0.0034820752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996871,0.00010499022,0.000014669585,0.00005011338,0.00009586693,0.000047310303],"domain_scores_gemma":[0.9994966,0.0002908621,0.000044922384,0.000026858474,0.00011896045,0.000021845866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000950322,0.0005580497,0.00075391267,0.00034796476,0.000529401,0.0011386864,0.0009770943,0.0010071784,0.0024152924],"category_scores_gemma":[0.001990149,0.0003433771,0.0007067227,0.00039942266,0.0004574051,0.0011043892,0.0007803306,0.0007399786,0.0002866168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015171294,0.000029688432,0.0005175731,0.000032459244,0.000013430644,0.000074802745,0.000023697125,0.9825926,0.0007078822,0.0057999115,0.00023210376,0.009960777],"study_design_scores_gemma":[0.0000012871,0.000007929544,0.0000415398,0.0000012031202,0.0000017167071,0.0000082868555,0.000010145398,0.99877447,0.00010784977,0.000930238,0.00011407241,0.0000013407844],"about_ca_topic_score_codex":0.0044297404,"about_ca_topic_score_gemma":0.0033257976,"teacher_disagreement_score":0.0044297404,"about_ca_system_score_codex":0.00082503265,"about_ca_system_score_gemma":0.0010833312,"threshold_uncertainty_score":0.008807898},"labels":[],"label_agreement":null},{"id":"W4319779281","doi":"10.1016/j.ijepes.2023.109015","title":"Fairness of prosumers’ incentives in residential demand response: A practical decentralized optimization approach","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Fundação de Apoio à Pesquisa, Universidade Federal de Goiás","keywords":"News aggregator; Mathematical optimization; Shapley value; Scalability; Computer science; Flexibility (engineering); Demand response; Incentive; Linear programming; Game theory; Mathematics; Electricity; Mathematical economics; Economics; Engineering","score_opus":0.010134684127466357,"score_gpt":0.25626845795962866,"score_spread":0.2461337738321623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319779281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035649825,0.00019345063,0.9519955,0.0014725856,0.00010267758,0.00017150711,0.000102322636,0.00010884618,0.010203294],"genre_scores_gemma":[0.91937226,0.000186895,0.07140564,0.00029804278,0.00020360954,0.00022791619,0.000056831766,0.00010211763,0.008146685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99171644,0.005528507,0.00017623887,0.00095227273,0.00086175854,0.00076474407],"domain_scores_gemma":[0.97280246,0.022941383,0.0009589721,0.0012729608,0.0013753865,0.000648876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01659598,0.0015270159,0.0049419533,0.0012121542,0.0015492182,0.0039445185,0.0037966336,0.0040247464,0.0068283873],"category_scores_gemma":[0.036021046,0.0018845272,0.0017344325,0.0013861728,0.0031368479,0.0052396343,0.0033521163,0.0032336002,0.0004623838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022882877,0.0001432281,0.00034984548,0.00008533363,0.00006294994,0.00011373721,0.00015279361,0.8443565,0.00054354314,0.14451416,0.0014655316,0.007983676],"study_design_scores_gemma":[0.0000441483,0.000032061864,0.000090743364,0.0000091632255,0.000019265071,0.000020302263,0.000031527517,0.9413457,0.000120845805,0.05797493,0.00029775035,0.00001360069],"about_ca_topic_score_codex":0.0041714506,"about_ca_topic_score_gemma":0.003855512,"teacher_disagreement_score":0.01659598,"about_ca_system_score_codex":0.003641081,"about_ca_system_score_gemma":0.004458087,"threshold_uncertainty_score":0.08776897},"labels":[],"label_agreement":null},{"id":"W4320011674","doi":"10.2139/ssrn.4335173","title":"Internal Energy and Time Flow Potentials","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Society of Intestinal Research","funders":"","keywords":"Flow (mathematics); Mechanics; Physics","score_opus":0.0029664950646362846,"score_gpt":0.1737546241115774,"score_spread":0.17078812904694113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320011674","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1427634,0.0011797196,0.47147834,0.0022752304,0.00074837945,0.00006625855,0.00061780855,0.00031540883,0.38055542],"genre_scores_gemma":[0.8954777,0.0010095455,0.012785417,0.00015530178,0.00030034687,0.000059973376,0.0003588143,0.00027879054,0.08957407],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997979,0.000038660273,0.0000074601867,0.000030800646,0.000076833676,0.00004829084],"domain_scores_gemma":[0.99929917,0.00030365796,0.00006134934,0.000077063356,0.0001562659,0.00010248246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005807179,0.00038692317,0.00032635863,0.0010846877,0.0004977467,0.0019313094,0.000611692,0.0006058897,0.019064266],"category_scores_gemma":[0.0030218042,0.00022949533,0.0005414274,0.0009302252,0.00094732066,0.0031933952,0.00088507554,0.0011482434,0.0013373564],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018141971,0.000020727735,0.00034944149,0.000028212713,0.000008892531,0.000060510625,0.00007490394,0.035974607,0.0013473898,0.9503939,0.0012303473,0.010492917],"study_design_scores_gemma":[0.0000080669115,0.000023280712,0.0013218845,0.000031566946,0.000013819213,0.00018809772,0.00014176416,0.22674541,0.0022278621,0.7618181,0.007457694,0.00002243441],"about_ca_topic_score_codex":0.001111987,"about_ca_topic_score_gemma":0.0007707601,"teacher_disagreement_score":0.019064266,"about_ca_system_score_codex":0.0007507324,"about_ca_system_score_gemma":0.0007820499,"threshold_uncertainty_score":0.063776374},"labels":[],"label_agreement":null},{"id":"W4320030810","doi":"10.1109/mpel.2022.3222599","title":"Brainstorming for Game-Changing Ideas","year":2022,"lang":"en","type":"article","venue":"IEEE Power Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Brainstorming; Session (web analytics); Power (physics); Computer science; World Wide Web; Artificial intelligence","score_opus":0.005985899781007808,"score_gpt":0.20364988685598143,"score_spread":0.19766398707497362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320030810","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06507428,0.0038418118,0.65818685,0.045231175,0.013126183,0.0029519554,0.0007777647,0.0061353142,0.20467463],"genre_scores_gemma":[0.3546762,0.0029794422,0.5174728,0.015237397,0.0048447624,0.006659789,0.0017482995,0.0024753711,0.093905926],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99289215,0.0046593156,0.00021815966,0.00062715606,0.0011805708,0.00042271838],"domain_scores_gemma":[0.9759519,0.016618669,0.00083087647,0.002112289,0.0022025115,0.0022837722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009209905,0.0017699677,0.00061385677,0.0021726969,0.0022366277,0.0064070686,0.0023050748,0.0019404358,0.028136892],"category_scores_gemma":[0.03357656,0.00039635846,0.0011670903,0.00079677056,0.0035070395,0.0059763626,0.006621961,0.0038813795,0.0075224694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011006355,0.00082478457,0.0014956535,0.0024746251,0.00019153868,0.0015340912,0.06946022,0.0046694,0.016285082,0.1630417,0.3046916,0.4342306],"study_design_scores_gemma":[0.00042097495,0.00053011026,0.0007244711,0.000743251,0.00008231319,0.00087098026,0.01772828,0.009939544,0.006402045,0.20387909,0.75855654,0.00012237525],"about_ca_topic_score_codex":0.0001456098,"about_ca_topic_score_gemma":0.00039160755,"teacher_disagreement_score":0.028136892,"about_ca_system_score_codex":0.0012491447,"about_ca_system_score_gemma":0.0014168277,"threshold_uncertainty_score":0.09412724},"labels":[],"label_agreement":null},{"id":"W4320713616","doi":"10.1016/j.apenergy.2023.120833","title":"Consensus and sharing based distributed coordination of home energy management systems with demand response enabled baseboard heaters","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Incentive; Transactive memory; Demand response; Smart grid; Grid; Thermostat; Computer science; Distributed computing; Distributed generation; Electricity; Environmental economics; Engineering; Microeconomics; Renewable energy; Knowledge management; Economics","score_opus":0.006395385247198011,"score_gpt":0.17368597376869022,"score_spread":0.1672905885214922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320713616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38171718,0.00015223383,0.6073026,0.0003197878,0.00016931727,0.000116155956,0.000067746,0.00081012247,0.009344768],"genre_scores_gemma":[0.99291563,0.000010729215,0.0061108046,0.000012500421,0.00000960578,0.000017091135,0.000013707859,0.000009069462,0.00090085604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927956,0.00018262949,0.000037741676,0.0001968472,0.00015282945,0.00015041471],"domain_scores_gemma":[0.99889237,0.00043121062,0.00011233953,0.00016430952,0.00029341804,0.00010649287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012159003,0.0004585202,0.0008381595,0.00026649237,0.0007180449,0.0011084862,0.001125565,0.0005646096,0.001931247],"category_scores_gemma":[0.0017340445,0.0002950204,0.0003187675,0.00031134873,0.00057314825,0.00081707665,0.0010445884,0.0006300056,0.00023576597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006197963,0.00021495733,0.0009960857,0.000053835203,0.000059867372,0.00017398015,0.0002574494,0.92842543,0.015168417,0.006704764,0.0012472774,0.046078134],"study_design_scores_gemma":[0.0000199344,0.000070531714,0.00021461422,0.0000011975067,0.0000077898985,0.000009567083,0.00003407917,0.99584514,0.0021343946,0.001414191,0.00024376238,0.0000049130317],"about_ca_topic_score_codex":0.004240447,"about_ca_topic_score_gemma":0.0040383865,"teacher_disagreement_score":0.004240447,"about_ca_system_score_codex":0.0007280202,"about_ca_system_score_gemma":0.00086693297,"threshold_uncertainty_score":0.008431554},"labels":[],"label_agreement":null},{"id":"W4321613871","doi":"10.1080/15325008.2023.2179688","title":"Smart Home Appliances’ Scheduling by Two-Stage Optimization with Real-Time Price Model","year":2023,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Electricity; Electricity pricing; Operations research; Demand response; Dual (grammatical number); Smart grid; Mathematical optimization; Dynamic pricing; Real-time computing; Electricity market; Engineering; Operations management; Economics; Electrical engineering; Microeconomics","score_opus":0.009930231895792337,"score_gpt":0.19755527099753742,"score_spread":0.18762503910174508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321613871","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027520398,0.00020818891,0.9644787,0.00031751316,0.00007661078,0.000103593506,0.000093828254,0.00018559916,0.007015573],"genre_scores_gemma":[0.8825784,0.00029572635,0.10574352,0.00009869693,0.00006427007,0.00036271007,0.00013531646,0.00007458374,0.010646849],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995383,0.00017034788,0.000020609057,0.00009188018,0.000107758024,0.00007112285],"domain_scores_gemma":[0.99953127,0.00028614808,0.000057686615,0.00001899781,0.000079554025,0.00002632315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010201557,0.0007874063,0.0013082904,0.00041661662,0.00038757402,0.0012658933,0.0014691856,0.0014873013,0.0029924575],"category_scores_gemma":[0.0013722628,0.00077381433,0.0011468907,0.0006884863,0.00063371647,0.0010195082,0.0007465257,0.0013849515,0.0003323919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015829364,0.000016210837,0.00008809424,0.0000105458685,0.000008178817,0.000013497146,0.000005853147,0.99638593,0.0001445544,0.0014942893,0.0001200536,0.0016968726],"study_design_scores_gemma":[0.0000026997138,0.0000044474987,0.000016892194,3.9650254e-7,0.000001360699,0.0000010345424,9.4154666e-7,0.99971217,0.000030384675,0.00018832184,0.00004031001,0.0000010597427],"about_ca_topic_score_codex":0.011240585,"about_ca_topic_score_gemma":0.00848252,"teacher_disagreement_score":0.011240585,"about_ca_system_score_codex":0.0010202125,"about_ca_system_score_gemma":0.0014938989,"threshold_uncertainty_score":0.022350311},"labels":[],"label_agreement":null},{"id":"W4321634156","doi":"10.56979/401/2022/77","title":"Prediction of Electric Power Demand of HVACs for Operating Rooms in Case of Dynamic Set Points of Temperature: A Case Study","year":2022,"lang":"en","type":"article","venue":"Journal of Computing & Biomedical Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Artificial neural network; Electric power; Set (abstract data type); Power consumption; Power (physics); Recurrent neural network; Power demand; Electric power system; Artificial intelligence; Machine learning; Industrial engineering; Engineering","score_opus":0.010070007109399478,"score_gpt":0.24844708885609398,"score_spread":0.2383770817466945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321634156","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9884644,0.00015497605,0.008269244,0.000287793,0.000040946226,0.000041875286,0.0010171384,0.00015306377,0.0015706634],"genre_scores_gemma":[0.9963599,0.00007181165,0.0024310776,0.000012746958,0.000012854238,0.000016279882,0.00054992153,0.000007747807,0.0005377044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9997166,0.000052864692,0.000025894231,0.000088855915,0.00006899941,0.000046784364],"domain_scores_gemma":[0.99881786,0.00073233113,0.000107182226,0.00007877665,0.00019015008,0.000073721414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052907283,0.00074736535,0.00048505157,0.00076904264,0.0003046223,0.0006416704,0.0009586712,0.0012350343,0.0013559762],"category_scores_gemma":[0.0016235961,0.0003309958,0.0007291318,0.0008073685,0.00032581334,0.00068687374,0.00035478827,0.0007949868,0.00025678624],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041166582,0.0004696361,0.08056827,0.00020732218,0.00012171778,0.0048144036,0.00020335332,0.8836001,0.0038893328,0.0007446646,0.0030071721,0.021962259],"study_design_scores_gemma":[0.000016934002,0.00008305523,0.017465908,0.000008441568,0.000016426307,0.00019610608,0.00015369616,0.9796637,0.0016303617,0.00037277516,0.0003732739,0.000019358722],"about_ca_topic_score_codex":0.015345212,"about_ca_topic_score_gemma":0.017108468,"teacher_disagreement_score":0.015345212,"about_ca_system_score_codex":0.0008477192,"about_ca_system_score_gemma":0.00040660374,"threshold_uncertainty_score":0.030511796},"labels":[],"label_agreement":null},{"id":"W4322502377","doi":"10.3390/en16052251","title":"The Impact of Battery Storage on Power Flow and Economy in an Automated Transactive Energy Market","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prosumer; Battery (electricity); Energy storage; Energy market; Grid; Energy flow; Computer science; Environmental economics; Energy (signal processing); Power (physics); Control (management); Smart grid; Flow battery; Electricity; Reliability engineering; Economics; Engineering; Electrical engineering; Renewable energy","score_opus":0.005368360548913925,"score_gpt":0.221676151071919,"score_spread":0.21630779052300506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322502377","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9670233,0.00006226522,0.025404714,0.00018955886,0.000009744398,0.000051236886,0.000023526422,0.00007294059,0.007162615],"genre_scores_gemma":[0.99874556,0.000009257904,0.0010042766,0.000007815761,0.0000010831078,0.0000066427538,0.0000032056093,0.0000022075471,0.00021989222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894017,0.00062138174,0.000030543448,0.00009900665,0.00015610967,0.00015285333],"domain_scores_gemma":[0.99570054,0.0031668213,0.0004158151,0.0002843089,0.00026058717,0.00017196679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021031818,0.0005342606,0.00041298862,0.00037137393,0.0005389323,0.0014935987,0.00076453306,0.00077221694,0.0022714227],"category_scores_gemma":[0.0052801017,0.00024377079,0.00029072462,0.00030668368,0.0011985062,0.0025522301,0.001211149,0.00059920794,0.000120885255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001272435,0.000675222,0.0054100226,0.000073690826,0.000064567575,0.00045925143,0.00025909996,0.93024695,0.007999232,0.018598141,0.00028110878,0.034660295],"study_design_scores_gemma":[0.00009783095,0.00065645896,0.002085516,0.0000052416017,0.000018569486,0.000084822655,0.00033704506,0.98410195,0.0030367875,0.009123989,0.00043375907,0.000017941727],"about_ca_topic_score_codex":0.0036498082,"about_ca_topic_score_gemma":0.0027345314,"teacher_disagreement_score":0.0036498082,"about_ca_system_score_codex":0.0008682655,"about_ca_system_score_gemma":0.00079248665,"threshold_uncertainty_score":0.011122823},"labels":[],"label_agreement":null},{"id":"W4322714933","doi":"10.5281/zenodo.7683252","title":"Data-Driven Distributionally Robust Chance-Constrained Unit Commitment With Uncertain Wind Power","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Power system simulation; Wind power; Mathematical optimization; Robust optimization; Unit (ring theory); Power (physics); Computer science; Wind power forecasting; Economics; Operations research; Control theory (sociology); Mathematics; Electric power system; Engineering; Artificial intelligence; Electrical engineering; Physics; Control (management)","score_opus":0.03962861250842843,"score_gpt":0.22163923328114443,"score_spread":0.18201062077271601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322714933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022578208,0.000143797,0.9746567,0.00018877351,0.000032065076,0.00004124327,0.000125046,0.00014302018,0.002091198],"genre_scores_gemma":[0.9380456,0.0001582035,0.05952646,0.00007871243,0.00003256905,0.00012473902,0.00024727502,0.00006584633,0.0017205842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987631,0.0004927971,0.00007279187,0.00024219314,0.00029981023,0.00012944147],"domain_scores_gemma":[0.99811953,0.0011459276,0.00031759762,0.0001496835,0.0002014811,0.00006578556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015833337,0.000974533,0.0013413504,0.0003070248,0.0003691625,0.0013022101,0.0014674831,0.00090595474,0.0016802745],"category_scores_gemma":[0.0039302907,0.00073467894,0.00077216176,0.00095041294,0.0008196102,0.001482318,0.0012214425,0.0017476245,0.00022547373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016860153,0.00000508134,0.000065817316,0.000012894771,0.0000073091583,0.000024199311,0.000007684216,0.99330324,0.00016167042,0.0034920166,0.00011657829,0.002786607],"study_design_scores_gemma":[0.0000025849931,0.000007668568,0.000020077714,0.000001242698,0.0000012804933,0.0000037073933,0.000001705714,0.9983095,0.00010439188,0.0014924022,0.000053179116,0.000002239896],"about_ca_topic_score_codex":0.0045565115,"about_ca_topic_score_gemma":0.0029917904,"teacher_disagreement_score":0.0045565115,"about_ca_system_score_codex":0.0009011075,"about_ca_system_score_gemma":0.0011494232,"threshold_uncertainty_score":0.009059966},"labels":[],"label_agreement":null},{"id":"W4323048897","doi":"10.1016/s0735-1097(23)01905-8","title":"INCIDENCE OF LEFT VENTRICULAR THROMBUS FOLLOWING STEMI IN MODERN REPERFUSION NETWORKS USING MULTIMODALITY IMAGING: A SYSTEMATIC REVIEW AND META-ANALYSIS","year":2023,"lang":"en","type":"review","venue":"Journal of the American College of Cardiology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Medicine; Thrombus; Incidence (geometry); Multimodality; Cardiology; Internal medicine; Meta-analysis; Radiology; World Wide Web","score_opus":0.04338639726732663,"score_gpt":0.3089927852901797,"score_spread":0.2656063880228531,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323048897","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010041819,0.98861176,0.00033698697,0.00010464029,0.00011910463,0.00008012941,0.00050395826,0.000014823949,0.00018669045],"genre_scores_gemma":[0.2559763,0.7394758,0.0015415709,0.0011026085,0.00036343499,0.00027101464,0.00085273467,0.000034388515,0.00038221964],"study_design_codex":"meta_analysis","study_design_gemma":"meta_analysis","domain_scores_codex":[0.99679536,0.0008500957,0.0012300077,0.0006044211,0.0003600661,0.00016005349],"domain_scores_gemma":[0.9923698,0.0049962667,0.0017150935,0.00030252215,0.0005025033,0.00011382913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004263173,0.0016689124,0.010381003,0.003057328,0.00040913603,0.0024604006,0.0014612965,0.0020648304,0.003464997],"category_scores_gemma":[0.012639099,0.001176993,0.025593042,0.004434723,0.00058338384,0.0016980069,0.0013573148,0.0018889713,0.00031841002],"study_design_candidate":"meta_analysis","study_design_consensus":"meta_analysis","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034679065,0.000053598087,0.019709518,0.3119041,0.6423,0.00020387094,0.0001451199,0.00039894605,0.00038332763,0.00014562094,0.001053544,0.02023454],"study_design_scores_gemma":[0.0006867967,0.00021744413,0.013081964,0.014240385,0.9695683,0.00015662599,0.00008541798,0.00014996598,0.000082549486,0.00017773593,0.0015056932,0.000047154026],"about_ca_topic_score_codex":0.004000018,"about_ca_topic_score_gemma":0.012588415,"teacher_disagreement_score":0.010381003,"about_ca_system_score_codex":0.0008510607,"about_ca_system_score_gemma":0.001622489,"threshold_uncertainty_score":0.022546113},"labels":[],"label_agreement":null},{"id":"W4323845467","doi":"10.3390/su15064891","title":"An Exploratory Study of the Perception of Peer-to-Peer Energy Trading within the Power Distribution Network in the UAE","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Peer-to-peer; Electricity; Environmental economics; Business; Grid; Distributed generation; Marketing; Computer science; Computer security; Economics; Engineering; Distributed computing; Renewable energy; Electrical engineering","score_opus":0.01010608386050385,"score_gpt":0.24152213434308106,"score_spread":0.2314160504825772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323845467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.997384,0.00006413431,0.000180653,0.00041286158,0.000010650169,0.000023745946,0.000012462762,0.0000020536327,0.0019093356],"genre_scores_gemma":[0.99850273,0.00015190073,0.00018772914,0.00022518303,0.0000055747523,0.000019871924,0.000008899275,0.0000032362589,0.00089485175],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9968432,0.002086029,0.00008233376,0.00014392425,0.0003313058,0.00051317166],"domain_scores_gemma":[0.99477935,0.0027386106,0.00064944784,0.00012428858,0.0007361665,0.00097210635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003756397,0.00031327282,0.00047079523,0.00092423806,0.005685616,0.0036034419,0.0008353012,0.0010853688,0.003135101],"category_scores_gemma":[0.0068117566,0.00036115234,0.00024101348,0.0007234725,0.0036639785,0.0032224627,0.002402021,0.0023009442,0.00036891553],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058453585,0.0003928039,0.02657383,0.000096442716,0.000008531336,0.001360183,0.9618601,0.00006409862,0.0010212455,0.0015968995,0.00062600913,0.006341375],"study_design_scores_gemma":[0.0000019359134,0.000077181925,0.0076174196,0.000028111597,0.0000019068107,0.000117697244,0.98901993,0.00015145463,0.00008284732,0.00008920412,0.0028050086,0.0000073759506],"about_ca_topic_score_codex":0.008430439,"about_ca_topic_score_gemma":0.013035929,"teacher_disagreement_score":0.008430439,"about_ca_system_score_codex":0.0018142512,"about_ca_system_score_gemma":0.0014725885,"threshold_uncertainty_score":0.01986599},"labels":[],"label_agreement":null},{"id":"W4324373962","doi":"10.1016/j.energy.2023.127212","title":"Integration of design and control for renewable energy systems with an application to anaerobic digestion: A deep deterministic policy gradient framework","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; Consejo Nacional de Ciencia y Tecnología","keywords":"Biogas; Reinforcement learning; Anaerobic digestion; Renewable energy; Mathematical optimization; Computer science; Process (computing); Function (biology); Engineering; Mathematics; Artificial intelligence","score_opus":0.010089360253153962,"score_gpt":0.22089348457344307,"score_spread":0.2108041243202891,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324373962","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023576016,0.00054383016,0.9700464,0.00037913813,0.00005026413,0.00006270607,0.000028605844,0.00014588848,0.005167248],"genre_scores_gemma":[0.9073032,0.00040639046,0.0883845,0.000144158,0.00005688369,0.00022884725,0.000051491486,0.000050212035,0.00337433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995983,0.0001529733,0.000014902557,0.00006004167,0.00010957017,0.00006421217],"domain_scores_gemma":[0.99929285,0.00042275808,0.000080267855,0.000026408812,0.00013095042,0.000046731857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013361565,0.0012009019,0.0011177767,0.00050432776,0.0003406186,0.0010686106,0.00082666246,0.0011947021,0.0012677816],"category_scores_gemma":[0.0019052875,0.00064676924,0.00074754836,0.00033075447,0.00092671235,0.0006681692,0.0011666251,0.0012341007,0.00016378563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010220999,0.000011775523,0.00008780791,0.000017344475,0.000009486384,0.000015288893,0.000008587333,0.9932516,0.00018460077,0.0029874283,0.000059591304,0.003356224],"study_design_scores_gemma":[0.00000239129,0.000010075651,0.000015825091,0.0000014828598,0.0000016763997,0.0000013357803,0.0000011570274,0.9990453,0.000051086365,0.0007924966,0.000076275486,8.8967477e-7],"about_ca_topic_score_codex":0.009108049,"about_ca_topic_score_gemma":0.0056316326,"teacher_disagreement_score":0.009108049,"about_ca_system_score_codex":0.0011209762,"about_ca_system_score_gemma":0.0018172908,"threshold_uncertainty_score":0.018110037},"labels":[],"label_agreement":null},{"id":"W4352980647","doi":"10.1109/npsc57038.2022.10069194","title":"Decentralized Optimal Home Energy Management in Active Distribution Networks","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reliability engineering; Demand response; Computer science; Energy management; Smart grid; Renewable energy; Grid; Energy management system; Integer programming; Energy storage; Transformer; Electric power system; Electricity; Operations research; Engineering; Power (physics); Energy (signal processing); Electrical engineering","score_opus":0.003843810101794296,"score_gpt":0.17348462733891867,"score_spread":0.16964081723712437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4352980647","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12784176,0.00034316792,0.86365646,0.00019932094,0.0000315708,0.0000811378,0.00009194766,0.0002314714,0.0075232238],"genre_scores_gemma":[0.98962563,0.00008228017,0.009110243,0.00001529413,0.000009707292,0.000034827157,0.000020334079,0.000010559044,0.0010910798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969363,0.0001221833,0.000008467487,0.000064393564,0.000056602497,0.000054784323],"domain_scores_gemma":[0.9997404,0.00012687145,0.000062343264,0.000013865538,0.00003684516,0.000019711224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000470699,0.0004570305,0.00055903755,0.00019930831,0.00028917685,0.0008409639,0.0005269937,0.00039091267,0.000987552],"category_scores_gemma":[0.0006419313,0.00030107354,0.00022861824,0.00026548104,0.00047154704,0.00059803005,0.00052711426,0.00042245068,0.0000953899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004634531,0.000026471056,0.0001900616,0.000018798612,0.000008774088,0.000024078829,0.000019536468,0.9885455,0.0008028631,0.0028905084,0.00021431081,0.0072127488],"study_design_scores_gemma":[0.0000053128983,0.000017522027,0.000056762216,0.0000010771656,0.0000019846336,0.000002925617,0.000006948675,0.998408,0.00014793243,0.0012535511,0.00009686013,0.0000012055427],"about_ca_topic_score_codex":0.0044841124,"about_ca_topic_score_gemma":0.0053257123,"teacher_disagreement_score":0.0044841124,"about_ca_system_score_codex":0.0008432022,"about_ca_system_score_gemma":0.0007225027,"threshold_uncertainty_score":0.00891602},"labels":[],"label_agreement":null},{"id":"W4360584207","doi":"10.1109/isgt51731.2023.10066398","title":"Power Management in Smart Buildings Using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Reinforcement learning; Schedule; Computer science; Markov decision process; Particle swarm optimization; Mathematical optimization; Energy storage; Energy management; Metaheuristic; Battery (electricity); Microgrid; Markov process; Power (physics); Energy (signal processing); Artificial intelligence; Machine learning; Mathematics","score_opus":0.012234279029244195,"score_gpt":0.2205747348603178,"score_spread":0.2083404558310736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4360584207","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039526552,0.00028460324,0.9555735,0.00020127956,0.000037643134,0.000047231188,0.000016360222,0.00035962072,0.0039531616],"genre_scores_gemma":[0.97003126,0.00012532213,0.02861527,0.000050020426,0.000023086755,0.00004669968,0.000017643453,0.000014985375,0.0010756924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972814,0.00009953442,0.000011777287,0.000058065223,0.00006677112,0.000035674148],"domain_scores_gemma":[0.99961287,0.00020095025,0.00007101604,0.000029663774,0.000060833325,0.00002468902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006016673,0.00042960572,0.00057164876,0.00016859858,0.00023268463,0.0005041617,0.000584738,0.00046536364,0.0009700924],"category_scores_gemma":[0.0011418425,0.0001841273,0.00026716347,0.00016137722,0.0005915045,0.0006002706,0.0004698679,0.00063763803,0.00014423869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026955393,0.000046080004,0.0005379636,0.000027440654,0.000020944766,0.00004121173,0.00002495821,0.96892357,0.001353008,0.0045085624,0.00026696734,0.024222458],"study_design_scores_gemma":[0.0000056155454,0.000018499475,0.00006377715,0.0000018225462,0.0000020228151,0.000005516256,0.0000028603415,0.99814856,0.00018876356,0.0013697442,0.00019109724,0.0000017404464],"about_ca_topic_score_codex":0.0033726993,"about_ca_topic_score_gemma":0.0030923558,"teacher_disagreement_score":0.0033726993,"about_ca_system_score_codex":0.0005384904,"about_ca_system_score_gemma":0.00056025427,"threshold_uncertainty_score":0.0067061186},"labels":[],"label_agreement":null},{"id":"W4361185981","doi":"10.1109/isgtmiddleeast56437.2023.10078477","title":"Density And Dynamic Time Warping Based Spatial Clustering For Appliance Operation Modes","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Cluster analysis; Dynamic time warping; DBSCAN; Silhouette; Computer science; Image warping; Data mining; Partition (number theory); Consensus clustering; Pattern recognition (psychology); Artificial intelligence; Correlation clustering; CURE data clustering algorithm; Mathematics","score_opus":0.008230991195419755,"score_gpt":0.2046610672516357,"score_spread":0.19643007605621593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361185981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18358439,0.0022470118,0.79904014,0.0006578239,0.000275429,0.0002621198,0.0040825526,0.0038156346,0.0060348967],"genre_scores_gemma":[0.7365013,0.0012032136,0.24463758,0.00015201002,0.00014510543,0.00027211758,0.01086188,0.00030851405,0.005918317],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990557,0.00018771992,0.00007097125,0.00033370804,0.0002441595,0.00010771134],"domain_scores_gemma":[0.9987895,0.00034195764,0.00017177289,0.00024143461,0.00039532466,0.00006007691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006858393,0.0011686578,0.0009780932,0.0030966967,0.0007363019,0.0010588892,0.001222925,0.0006687351,0.0014291593],"category_scores_gemma":[0.0034337721,0.00030143658,0.001157874,0.0042711417,0.00044295596,0.0013103985,0.0009247586,0.0008915773,0.0013851798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007724573,0.00033796628,0.020369228,0.00050813437,0.00045433725,0.00050295104,0.0007271937,0.3969346,0.013299459,0.008561408,0.019696565,0.53783566],"study_design_scores_gemma":[0.000011292443,0.000051481453,0.005523807,0.000021310801,0.00003127843,0.00022405175,0.00029420396,0.979258,0.0047083246,0.0051486907,0.0046894476,0.000038261674],"about_ca_topic_score_codex":0.014732344,"about_ca_topic_score_gemma":0.016331516,"teacher_disagreement_score":0.014732344,"about_ca_system_score_codex":0.0009071935,"about_ca_system_score_gemma":0.0007166311,"threshold_uncertainty_score":0.02929318},"labels":[],"label_agreement":null},{"id":"W4361279794","doi":"10.3390/buildings13040911","title":"A Design and Comparative Analysis of a Home Energy Disaggregation System Based on a Multi-Target Learning Framework","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Walailak University","keywords":"Computer science; Machine learning; Inference; Artificial intelligence; Kernel (algebra); Data mining; Autoencoder; Electric power system; Energy consumption; Energy (signal processing); Kernel density estimation; Power (physics); Deep learning; Engineering; Statistics","score_opus":0.024443877471152158,"score_gpt":0.23702917900615664,"score_spread":0.2125853015350045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361279794","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3111995,0.00021956711,0.6782079,0.00032614442,0.00006484613,0.00039305838,0.00012866268,0.0016771241,0.007783302],"genre_scores_gemma":[0.9707939,0.000044098186,0.027773513,0.000032085758,0.0000069398316,0.00011028223,0.000059061018,0.000016545875,0.001163549],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959797,0.00011231055,0.000017567269,0.00011473852,0.000101576334,0.000055942557],"domain_scores_gemma":[0.99970263,0.00007282582,0.000029348148,0.000048385806,0.000112402675,0.00003440688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074658444,0.0004114653,0.00053934596,0.00024702953,0.00038746948,0.0005988796,0.00054300705,0.00047297773,0.0020084355],"category_scores_gemma":[0.00069980917,0.00018468399,0.00036045103,0.00019050777,0.00025587343,0.0006810108,0.0004993408,0.00041145997,0.00036534423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012281393,0.000738221,0.0077035143,0.00034905563,0.00013969564,0.0002587278,0.0002284318,0.72466797,0.059560254,0.006196226,0.0017422697,0.19718741],"study_design_scores_gemma":[0.00002617699,0.0005082911,0.0013689725,0.00000334582,0.000019094632,0.000027070804,0.000020870115,0.9905132,0.0064546736,0.00034318096,0.0007065072,0.000008533753],"about_ca_topic_score_codex":0.0034493431,"about_ca_topic_score_gemma":0.002184519,"teacher_disagreement_score":0.0034493431,"about_ca_system_score_codex":0.0005903617,"about_ca_system_score_gemma":0.0006616978,"threshold_uncertainty_score":0.0068585277},"labels":[],"label_agreement":null},{"id":"W4361760000","doi":"10.35682/jje.v1i1.59","title":"Distributed Energy Resources Electrical Systems: Current status and Future prospective","year":2022,"lang":"en","type":"article","venue":"Jordan Journal of Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distributed generation; Environmental economics; Payback period; Electricity; Reliability engineering; Investment (military); Electricity generation; Computer science; Reliability (semiconductor); Electric power system; Business; Automotive engineering; Risk analysis (engineering); Power (physics); Production (economics); Engineering; Economics; Electrical engineering; Renewable energy; Microeconomics","score_opus":0.004090440278603382,"score_gpt":0.18557920608553732,"score_spread":0.18148876580693393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361760000","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048429887,0.9139505,0.009076702,0.018277168,0.0015397826,0.00003840888,0.00013466024,0.00016092605,0.051978868],"genre_scores_gemma":[0.06932318,0.89251447,0.010783091,0.0026640282,0.0024849195,0.000067765446,0.00035063658,0.000046064135,0.021765785],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994735,0.0001627149,0.000046306126,0.00006244805,0.00020437964,0.000050634128],"domain_scores_gemma":[0.99799144,0.0009960635,0.00014584695,0.00008205065,0.00059961906,0.0001850474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025450324,0.00041407841,0.00050858414,0.0008242964,0.00045574727,0.0028041573,0.00062379066,0.0017048321,0.011193157],"category_scores_gemma":[0.0017495988,0.00021649266,0.00029781277,0.0023941682,0.0011223134,0.004242703,0.0010858853,0.0015060604,0.002476114],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107980435,0.00014109949,0.0012921699,0.0018527113,0.00001998041,0.00008907779,0.00014688601,0.002303073,0.00069996854,0.040048458,0.027996631,0.925302],"study_design_scores_gemma":[0.000019608027,0.0003286313,0.0018532897,0.00301654,0.000033827848,0.00028303784,0.00078844174,0.0036073094,0.00056627404,0.022445127,0.9670262,0.00003164519],"about_ca_topic_score_codex":0.00091684336,"about_ca_topic_score_gemma":0.0014399703,"teacher_disagreement_score":0.011193157,"about_ca_system_score_codex":0.0008796209,"about_ca_system_score_gemma":0.0017533387,"threshold_uncertainty_score":0.03744483},"labels":[],"label_agreement":null},{"id":"W4361828607","doi":"10.1109/tpec56611.2023.10078524","title":"Bi-Level Transactive Coordination of Energy Management Systems in a Community","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Energy consumption; Computer science; Demand response; Energy management; Consumption (sociology); Grid; Work (physics); Load management; Energy (signal processing); Distributed computing; Knowledge management; Electricity; Engineering","score_opus":0.02500103124293517,"score_gpt":0.2156979560428705,"score_spread":0.19069692479993533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361828607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07261503,0.0001512454,0.91157585,0.00026051045,0.000051510655,0.00019898247,0.000028358581,0.00073155464,0.014386983],"genre_scores_gemma":[0.8751742,0.00008392709,0.115996666,0.00007672026,0.000024573235,0.0001223041,0.00006117582,0.00006302704,0.008397345],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885297,0.00033241475,0.000057874364,0.0003024792,0.00028109405,0.00017314416],"domain_scores_gemma":[0.9992405,0.00012769281,0.00008481412,0.00018021335,0.00021652492,0.00015022249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011212977,0.0004860559,0.00040610787,0.000570509,0.0010910648,0.0016819414,0.001550294,0.00064363686,0.003834377],"category_scores_gemma":[0.0012545694,0.00023601766,0.00048197142,0.0005589139,0.00068381574,0.0018958496,0.0029902917,0.00076162483,0.000635223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005610837,0.0007268383,0.0071403626,0.00026849096,0.00026833138,0.0011295093,0.002273756,0.46047214,0.060862377,0.13165127,0.004899096,0.32974672],"study_design_scores_gemma":[0.00004217217,0.00026762162,0.0011340699,0.00002255321,0.000056055414,0.00026315337,0.0006361083,0.94886863,0.007981371,0.026518032,0.014172914,0.000037274353],"about_ca_topic_score_codex":0.003616235,"about_ca_topic_score_gemma":0.004964263,"teacher_disagreement_score":0.003834377,"about_ca_system_score_codex":0.0007349892,"about_ca_system_score_gemma":0.0011777051,"threshold_uncertainty_score":0.012827218},"labels":[],"label_agreement":null},{"id":"W4362446409","doi":"10.1016/j.apenergy.2023.121020","title":"Geographic-information-based stochastic optimization model for multi-microgrid planning","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Universidade Federal do ABC","keywords":"Microgrid; Geographic information system; Grid; Computer science; Monte Carlo method; Renewable energy; Stochastic modelling; Energy planning; Stochastic programming; Context (archaeology); Mathematical optimization; Operations research; Engineering; Control (management); Geography; Artificial intelligence; Mathematics; Cartography","score_opus":0.017778595694907504,"score_gpt":0.21807002750863272,"score_spread":0.20029143181372522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362446409","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050756138,0.0006863984,0.93512416,0.0010318339,0.00016010669,0.0001343778,0.0018956183,0.0006005585,0.009610795],"genre_scores_gemma":[0.9594419,0.00046153757,0.030258834,0.000116856,0.000059722293,0.00021348354,0.00093639793,0.00009255327,0.008418664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920386,0.00031542956,0.000040652238,0.00017536119,0.0001469163,0.00011793814],"domain_scores_gemma":[0.9989575,0.00053106796,0.00018210306,0.000041645915,0.00021641591,0.000071300004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013795603,0.0010726976,0.0020564338,0.00087593915,0.0005080836,0.0015358618,0.002180492,0.0015540865,0.0039931466],"category_scores_gemma":[0.0026361584,0.0010500652,0.0010048476,0.0022033416,0.0008068533,0.001341047,0.0012664999,0.0013893633,0.0004665511],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075652742,0.000003598445,0.00006875965,0.0000066899197,0.000006252638,0.0000110729925,0.0000034091297,0.997509,0.000031715954,0.0016412501,0.0001433048,0.0005673158],"study_design_scores_gemma":[0.000002667312,0.000004214848,0.000039212387,0.0000010553101,0.0000026040555,0.0000023261334,0.0000017973235,0.9992059,0.00001161443,0.0006518451,0.00007503007,0.0000017794005],"about_ca_topic_score_codex":0.039486397,"about_ca_topic_score_gemma":0.028185574,"teacher_disagreement_score":0.039486397,"about_ca_system_score_codex":0.0019808712,"about_ca_system_score_gemma":0.0018633106,"threshold_uncertainty_score":0.078513145},"labels":[],"label_agreement":null},{"id":"W4362559193","doi":"10.3390/su15076165","title":"Novel Decentralized Peer-to-Peer Gas and Electricity Transaction Market between Prosumers and Retailers Considering Integrated Demand Response Programs","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Demand response; Electricity; Peer-to-peer; Database transaction; Distributed generation; Computer science; Environmental economics; Business; Distributed computing; Renewable energy; Economics; Electrical engineering; Engineering","score_opus":0.013214672831937647,"score_gpt":0.24028177145567522,"score_spread":0.22706709862373758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362559193","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0720623,0.00031572097,0.9157738,0.0003745766,0.00009012449,0.00018191362,0.00011636256,0.00022282489,0.0108623635],"genre_scores_gemma":[0.9319498,0.0001748499,0.060738187,0.00009366256,0.000051865267,0.00018745298,0.00009557558,0.0000407106,0.0066678748],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922633,0.00023240304,0.000022502012,0.00021424372,0.00017567865,0.00012880596],"domain_scores_gemma":[0.99941015,0.0002560635,0.00008095491,0.000036538822,0.00014531388,0.00007102792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077943323,0.00084565516,0.0016493567,0.0003066793,0.00089652836,0.0014537174,0.0019358802,0.0015991551,0.004040368],"category_scores_gemma":[0.001234872,0.0005023262,0.00059659255,0.00050128705,0.00067922607,0.0016793597,0.0014846015,0.000911355,0.00034965522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018374326,0.0001391952,0.00059035036,0.0001554789,0.000061031467,0.0006321111,0.00007837963,0.94570684,0.005025126,0.024780245,0.0018861555,0.020761456],"study_design_scores_gemma":[0.000018411793,0.00003865523,0.000059790505,0.0000019809668,0.0000062614063,0.000034886303,0.000019175459,0.99542916,0.00027717656,0.0036171102,0.0004910418,0.000006277454],"about_ca_topic_score_codex":0.0026194816,"about_ca_topic_score_gemma":0.0027909067,"teacher_disagreement_score":0.004040368,"about_ca_system_score_codex":0.0006376238,"about_ca_system_score_gemma":0.0012947761,"threshold_uncertainty_score":0.0135163665},"labels":[],"label_agreement":null},{"id":"W4362653285","doi":"10.1109/ojia.2023.3264651","title":"A Stochastic Approach to Integrating Electrical Thermal Storage in Distributed Demand Response for Nordic Communities With Wind Power Generation","year":2023,"lang":"en","type":"article","venue":"IEEE Open Journal of Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Flexibility (engineering); Distributed generation; Computer science; Thermal energy storage; Wind power; Peak demand; Grid; Energy storage; Renewable energy; Distributed data store; Smart grid; Distributed computing; Power (physics); Engineering; Electrical engineering; Electricity; Economics","score_opus":0.036758206030510186,"score_gpt":0.2752949790305711,"score_spread":0.2385367730000609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362653285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06277811,0.00015374378,0.9304238,0.00044388915,0.000047208716,0.00008801054,0.00007371313,0.00006895218,0.00592261],"genre_scores_gemma":[0.95514995,0.00015666494,0.041317433,0.000057299996,0.000028665043,0.00008696008,0.000036139274,0.000016682534,0.0031502484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999298,0.00035366474,0.000021087262,0.00011457638,0.000106119456,0.00010653205],"domain_scores_gemma":[0.99927706,0.0004100979,0.00011475749,0.000023495775,0.00009940872,0.00007518634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013134687,0.00082588656,0.00064412534,0.00046312308,0.0005299879,0.0011996959,0.0011442183,0.00081169995,0.0017090337],"category_scores_gemma":[0.0016810858,0.00048069775,0.00073452556,0.00048558795,0.0008483912,0.0009759324,0.0012240129,0.0009976442,0.00010749912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028565179,0.000030362065,0.00032382002,0.00002451927,0.000023751976,0.00008158372,0.000026450738,0.98184913,0.00068953645,0.0135869635,0.00016863432,0.0031665605],"study_design_scores_gemma":[0.000006448069,0.00003143073,0.00009540936,0.0000025606898,0.00000660183,0.000013496637,0.000021920474,0.9954091,0.00015673411,0.0040680133,0.00018292332,0.0000053930376],"about_ca_topic_score_codex":0.00883781,"about_ca_topic_score_gemma":0.013631109,"teacher_disagreement_score":0.00883781,"about_ca_system_score_codex":0.0014466668,"about_ca_system_score_gemma":0.001917219,"threshold_uncertainty_score":0.01757276},"labels":[],"label_agreement":null},{"id":"W4365445460","doi":"10.1016/j.ijepes.2023.109111","title":"Blockchain and cooperative game theory for peer-to-peer energy trading in smart grids","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Blockchain; Computer science; Smart grid; Incentive; Peer-to-peer; Renewable energy; Robustness (evolution); Game theory; Demand response; Scheme (mathematics); Distributed computing; Environmental economics; Computer security; Microeconomics; Engineering; Electricity; Economics","score_opus":0.009628925526890467,"score_gpt":0.24024630406076078,"score_spread":0.23061737853387032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365445460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04885614,0.0010931118,0.93371993,0.0015641272,0.0002200332,0.0001322023,0.00017886594,0.00015245906,0.014083146],"genre_scores_gemma":[0.9474736,0.0010593641,0.040990748,0.00013997582,0.00017532188,0.00022582174,0.00013117421,0.000053793246,0.009750347],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977685,0.0012171593,0.00008558621,0.00026442957,0.00043035345,0.0002339568],"domain_scores_gemma":[0.98775905,0.010061045,0.0005531995,0.00056136126,0.0006916141,0.00037362796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035338136,0.00096308434,0.0024073378,0.0009991418,0.0014276446,0.0027013202,0.0026320722,0.002610993,0.0056401114],"category_scores_gemma":[0.014087715,0.0006730487,0.00092471193,0.0016721077,0.003847093,0.0057544685,0.002574077,0.0029453128,0.0005870221],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116937525,0.00008572418,0.00030353814,0.00011898184,0.00004644791,0.00013770438,0.00015933531,0.4019416,0.0005400478,0.58714384,0.0013812401,0.008024661],"study_design_scores_gemma":[0.00002431849,0.000019507872,0.00004369958,0.000009170419,0.0000059829244,0.000013190285,0.00002009898,0.6839995,0.000086134685,0.3151872,0.00057971466,0.000011528122],"about_ca_topic_score_codex":0.0065617063,"about_ca_topic_score_gemma":0.004383296,"teacher_disagreement_score":0.0065617063,"about_ca_system_score_codex":0.002119604,"about_ca_system_score_gemma":0.0024641845,"threshold_uncertainty_score":0.018868089},"labels":[],"label_agreement":null},{"id":"W4365794531","doi":"10.2139/ssrn.4417808","title":"A Novel Non-Intrusive Framework for Real-Time Disaggregation of Behind-the-Meter Solar Generation from Smart Meter Data","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Metre; Smart meter; Computer science; Environmental science; Real-time computing; Remote sensing; Electrical engineering; Engineering; Geography; Smart grid; Physics; Astronomy","score_opus":0.036119438641429163,"score_gpt":0.264437539533279,"score_spread":0.2283181008918498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365794531","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0052734073,0.0001446402,0.9914089,0.00007577293,0.000077710356,0.00005364017,0.00017483097,0.0022166711,0.00057447626],"genre_scores_gemma":[0.41839215,0.0002529743,0.57608,0.00021475712,0.00039456206,0.00019106851,0.0010854193,0.00038128428,0.0030078324],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846494,0.00027925617,0.000087916276,0.00040549756,0.0006172598,0.00014510476],"domain_scores_gemma":[0.99808395,0.00060343597,0.00019591129,0.0006907135,0.0003042342,0.000121779536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015597385,0.0012307967,0.0014109234,0.00096176163,0.0005673371,0.0021388126,0.0026869003,0.0011875129,0.0023882224],"category_scores_gemma":[0.0048064077,0.0006661437,0.00064841955,0.0014147075,0.0005461627,0.0027880883,0.0034463136,0.0020370404,0.0012411949],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012186734,0.00081279146,0.0064613232,0.000401015,0.00048275004,0.0010427649,0.0007440339,0.291756,0.096295685,0.059671525,0.014097452,0.52701604],"study_design_scores_gemma":[0.000016555045,0.000033705623,0.00046710199,0.0000060786037,0.000013584656,0.00009298295,0.00002491833,0.9845078,0.003832507,0.008500117,0.0024886746,0.000015971398],"about_ca_topic_score_codex":0.0025513177,"about_ca_topic_score_gemma":0.004634689,"teacher_disagreement_score":0.0026869003,"about_ca_system_score_codex":0.00037442154,"about_ca_system_score_gemma":0.00089178834,"threshold_uncertainty_score":0.008248746},"labels":[],"label_agreement":null},{"id":"W4366332543","doi":"10.11113/jurnalteknologi.v85.18684","title":"IMPACT AND EVALUATION OF OPTIMIZED PV GENERATION IN THE DISTRIBUTION SYSTEM WITH VARYING LOAD DEMANDS","year":2023,"lang":"en","type":"article","venue":"Jurnal Teknologi","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut interdisciplinaire d'innovation technologique; Université de Sherbrooke","funders":"Universiti Teknologi Malaysia","keywords":"Dispatchable generation; Photovoltaic system; Renewable energy; Automotive engineering; Particle swarm optimization; Reduction (mathematics); Voltage; Electricity generation; Power (physics); Electric power system; Reliability engineering; Distributed generation; Computer science; Engineering; Mathematical optimization; Electrical engineering; Mathematics","score_opus":0.033762184699647764,"score_gpt":0.26854971020924595,"score_spread":0.2347875255095982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366332543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9839633,0.00013170861,0.011288835,0.00006578015,0.000012366503,0.00004317853,0.00012841659,0.00012611393,0.004240327],"genre_scores_gemma":[0.99905926,0.00002581504,0.00069459644,0.0000034452269,0.0000011217521,0.000005069432,0.00003196414,0.0000049385626,0.00017380666],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995516,0.00019888503,0.00001917342,0.000048246493,0.00010707638,0.00007492679],"domain_scores_gemma":[0.99911314,0.0005397155,0.00009671903,0.00006322087,0.00014781895,0.000039391914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007545261,0.0006017364,0.00044161102,0.0003553104,0.00022087575,0.00081085734,0.00036614318,0.0004017188,0.00084282464],"category_scores_gemma":[0.0017700056,0.0002181678,0.00036874463,0.0003964308,0.000266639,0.0006716944,0.00030259785,0.00039287124,0.00009656485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040129965,0.00011607983,0.004826566,0.00008763937,0.000048295726,0.00017660487,0.000035531793,0.9764608,0.006335496,0.00041851154,0.00019082485,0.010902363],"study_design_scores_gemma":[0.000039528808,0.0007850967,0.009833125,0.000009207896,0.00007487349,0.00005578508,0.00011322932,0.98098606,0.0075994576,0.00023361835,0.00025856902,0.000011489549],"about_ca_topic_score_codex":0.0053274347,"about_ca_topic_score_gemma":0.0047509186,"teacher_disagreement_score":0.0053274347,"about_ca_system_score_codex":0.0007358179,"about_ca_system_score_gemma":0.00036090764,"threshold_uncertainty_score":0.010592878},"labels":[],"label_agreement":null},{"id":"W4366957295","doi":"10.1109/jiot.2023.3267625","title":"Optimal Scheduling in IoT-Driven Smart Isolated Microgrids Based on Deep Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Guelph","funders":"Natural Sciences and Engineering Research Council of Canada; University of Guelph","keywords":"Reinforcement learning; Markov decision process; Computer science; Mathematical optimization; Correctness; Scheduling (production processes); Time horizon; Partially observable Markov decision process; Renewable energy; Markov process; Artificial intelligence; Markov chain; Markov model; Machine learning; Algorithm; Engineering; Mathematics","score_opus":0.010027529359323134,"score_gpt":0.22026128525847619,"score_spread":0.21023375589915305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366957295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16884527,0.0006037033,0.8242096,0.00062025903,0.00008341365,0.00006171454,0.00009434255,0.00056015083,0.0049216873],"genre_scores_gemma":[0.98072517,0.00007532492,0.017661849,0.00009546511,0.000016979595,0.00003571468,0.000051916108,0.000023694194,0.0013140163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997863,0.00005686839,0.000008901661,0.00005510181,0.000035179466,0.00005759605],"domain_scores_gemma":[0.99922967,0.0004433056,0.00011889059,0.000036278016,0.000096283555,0.00007562574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059207535,0.00067017006,0.0010163956,0.00020997718,0.00025987506,0.0005437243,0.00088498025,0.0006599972,0.0014838956],"category_scores_gemma":[0.0017152048,0.00037779417,0.00036471017,0.0002090104,0.0006809621,0.0006337216,0.00072530564,0.0008098543,0.00013665571],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035391375,0.000022221764,0.00043869356,0.000019069486,0.000016087393,0.000037594426,0.000016934891,0.99112576,0.00025535404,0.0013210768,0.0001954118,0.0065164547],"study_design_scores_gemma":[0.0000032492376,0.0000055199753,0.000029344747,9.806333e-7,0.0000014024596,0.0000018720972,0.0000018833484,0.9993161,0.000037373913,0.00057090604,0.000030730043,7.056692e-7],"about_ca_topic_score_codex":0.008787328,"about_ca_topic_score_gemma":0.007536334,"teacher_disagreement_score":0.008787328,"about_ca_system_score_codex":0.0008150556,"about_ca_system_score_gemma":0.0010443307,"threshold_uncertainty_score":0.017472386},"labels":[],"label_agreement":null},{"id":"W4367281612","doi":"10.1007/978-3-030-72322-4_65-1","title":"Machine Learning to Facilitate the Integration of Renewable Energies into the Grid","year":2022,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Renewable energy; Grid; Production (economics); Electricity; Environmental economics; Environmental science; Computer science; Process engineering; Industrial engineering; Engineering; Meteorology; Electrical engineering; Economics; Geography; Microeconomics","score_opus":0.022967082611408427,"score_gpt":0.19520186719085483,"score_spread":0.1722347845794464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367281612","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026059211,0.05038853,0.4012028,0.006377966,0.0031386502,0.00008799146,0.0005570616,0.0023894084,0.53325164],"genre_scores_gemma":[0.05290546,0.05303637,0.18025509,0.0019362649,0.0017317663,0.00014332474,0.0011173788,0.00085496524,0.7080193],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984276,0.000024641227,0.0000049552254,0.000022304654,0.00009538699,0.0000099440085],"domain_scores_gemma":[0.9998375,0.00009801939,0.0000075115345,0.000023947217,0.000027531893,0.0000054273623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022759278,0.00056532794,0.00034749717,0.0005101337,0.00026531526,0.001652148,0.0007171869,0.0007705061,0.018930417],"category_scores_gemma":[0.00053319096,0.00026480554,0.00034290945,0.0012261512,0.00041785694,0.0020119979,0.0006066065,0.0019470211,0.008006751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001841287,0.00006362095,0.00011174741,0.0003646202,0.000024937046,0.00006998071,0.000088298955,0.019310348,0.00285794,0.2795276,0.15832032,0.5392422],"study_design_scores_gemma":[0.000005742085,0.000019006988,0.00027669605,0.00023871215,0.000009547512,0.00017131022,0.00003261245,0.050881993,0.0031683797,0.16532654,0.7798531,0.000016321339],"about_ca_topic_score_codex":0.0009744411,"about_ca_topic_score_gemma":0.0018209084,"teacher_disagreement_score":0.018930417,"about_ca_system_score_codex":0.00059876806,"about_ca_system_score_gemma":0.0003980632,"threshold_uncertainty_score":0.063328505},"labels":[],"label_agreement":null},{"id":"W4367322618","doi":"10.1016/j.renene.2023.04.103","title":"An optimized scheduling strategy combining robust optimization and rolling optimization to solve the uncertainty of RES-CCHP MG","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Natural Science Foundation of China","keywords":"Microgrid; Robust optimization; Renewable energy; Scheduling (production processes); Demand response; Mathematical optimization; Optimization problem; Computer science; Automotive engineering; Engineering; Electricity; Mathematics","score_opus":0.01742498477894278,"score_gpt":0.22116670653569231,"score_spread":0.20374172175674954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367322618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03792483,0.00044854014,0.9489182,0.00023874459,0.000118933385,0.000077423916,0.00013352593,0.000599638,0.011540185],"genre_scores_gemma":[0.9342665,0.00012721577,0.06280595,0.000060385748,0.000041930307,0.00007038868,0.000110155306,0.00007555536,0.0024420246],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997212,0.000069497546,0.0000128789325,0.000058900627,0.000084379135,0.000053142554],"domain_scores_gemma":[0.9997855,0.000088036664,0.000037068796,0.000018199804,0.000051866493,0.000019327234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005550645,0.00087825785,0.0014529825,0.00047680622,0.00040965533,0.0010620767,0.0007792068,0.0007127757,0.0026011483],"category_scores_gemma":[0.00089765026,0.0005224628,0.0005996467,0.0006675107,0.00037526092,0.00067003217,0.00063145015,0.0006244637,0.00029553164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041005696,0.000013303132,0.00007860155,0.000027325112,0.000016557215,0.00002717931,0.000009762713,0.9866013,0.0010849311,0.001784184,0.0005081925,0.009807754],"study_design_scores_gemma":[0.0000031981986,0.000009193142,0.000030834384,0.0000010393869,0.0000031960187,0.0000023910266,0.0000021372261,0.9993831,0.00012254005,0.00033255597,0.000108131935,0.0000016130429],"about_ca_topic_score_codex":0.010389217,"about_ca_topic_score_gemma":0.008290112,"teacher_disagreement_score":0.010389217,"about_ca_system_score_codex":0.00060955586,"about_ca_system_score_gemma":0.001369167,"threshold_uncertainty_score":0.02065748},"labels":[],"label_agreement":null},{"id":"W4368246931","doi":"10.1007/978-3-031-29962-9_9","title":"Attention Towards Energy Infrastructures: Challenges and Solutions","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in systems, decision and control","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Environmental economics; Renewable energy; Energy engineering; Electrification; Corporate governance; Sustainability; Business; Efficient energy use; Critical infrastructure; Energy market; Rural electrification; Engineering; Electricity; Computer science; Computer security; Economics; Finance","score_opus":0.05745209365743016,"score_gpt":0.2582839712325953,"score_spread":0.20083187757516513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4368246931","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003585634,0.34543222,0.009576402,0.27317625,0.0116317095,0.000022053551,0.00010952647,0.00016096063,0.35630518],"genre_scores_gemma":[0.125227,0.5772256,0.005226361,0.079490595,0.024675013,0.000063254505,0.00025837845,0.0003029256,0.18753079],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990897,0.0002573028,0.00002386299,0.00012750454,0.0003388332,0.0001628121],"domain_scores_gemma":[0.9980952,0.0011071055,0.00010862484,0.00012191954,0.00038945428,0.00017771531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015090643,0.00085510785,0.0007530959,0.0017511351,0.0016066266,0.009783636,0.001120164,0.0047698636,0.0187072],"category_scores_gemma":[0.0028725418,0.00038518992,0.00044826325,0.004993385,0.0061274953,0.010099463,0.0032659573,0.0061117094,0.004164106],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015190481,0.000029322726,0.0002398774,0.00069646514,0.000010700687,0.000068188885,0.0009397954,0.0007413126,0.00045764685,0.690096,0.18695498,0.11975055],"study_design_scores_gemma":[0.000003909945,0.000012132094,0.00039627694,0.00091843295,0.00000800101,0.00010718913,0.0016114252,0.0004260972,0.00015984755,0.22734363,0.76900274,0.000010222719],"about_ca_topic_score_codex":0.004281895,"about_ca_topic_score_gemma":0.0067282547,"teacher_disagreement_score":0.0187072,"about_ca_system_score_codex":0.0038121173,"about_ca_system_score_gemma":0.0034696287,"threshold_uncertainty_score":0.06258178},"labels":[],"label_agreement":null},{"id":"W4376851132","doi":"10.1109/icjece.2022.3232213","title":"Energy Storage Management for Microgrids Using <i>n</i>-Step Bootstrapping","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy storage; Carbon footprint; Computer science; Renewable energy; Reinforcement learning; Control (management); Energy (signal processing); Smart grid; Reliability engineering; Artificial intelligence; Engineering; Electrical engineering; Greenhouse gas; Power (physics)","score_opus":0.008257578237875597,"score_gpt":0.17057037228279665,"score_spread":0.16231279404492105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376851132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16910139,0.0005398362,0.8118217,0.00039460434,0.000114928764,0.00022661951,0.00010464105,0.001435881,0.016260447],"genre_scores_gemma":[0.97283,0.00008324047,0.02590394,0.00002970168,0.000013897591,0.00004506961,0.000029957337,0.000013075738,0.0010511975],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999223,0.000022913375,0.0000057515367,0.000019492894,0.000018552983,0.000011040375],"domain_scores_gemma":[0.999864,0.000047540856,0.000025472475,0.000020941321,0.000028731392,0.000013234167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002787904,0.00038892942,0.00043234188,0.000149514,0.0004098364,0.00049878896,0.00061925704,0.00031007736,0.002030557],"category_scores_gemma":[0.0005262596,0.000108690045,0.0002745408,0.00021876581,0.00027624084,0.00044888025,0.00042541596,0.00033258842,0.0002601584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002179818,0.00014479522,0.0019395256,0.00019371272,0.00005864568,0.0002536468,0.00013153804,0.78188026,0.015464797,0.0056917774,0.0018979443,0.1921253],"study_design_scores_gemma":[0.0000068741224,0.00006207259,0.00026388865,0.00000661286,0.000007958797,0.000027575008,0.000018768653,0.9967146,0.0012623699,0.0009632089,0.00066150044,0.000004574749],"about_ca_topic_score_codex":0.0036641404,"about_ca_topic_score_gemma":0.005878485,"teacher_disagreement_score":0.0036641404,"about_ca_system_score_codex":0.00036588602,"about_ca_system_score_gemma":0.00044937243,"threshold_uncertainty_score":0.007285595},"labels":[],"label_agreement":null},{"id":"W4377024611","doi":"10.20944/preprints202305.1021.v1","title":"Integrated Demand Response Programs in Energy Hubs: A Review of Applications, Classifications, Models and Future Directions","year":2023,"lang":"en","type":"review","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Demand response; Renewable energy; Greenhouse gas; Electricity; Environmental economics; Computer science; Electric power system; Energy consumption; Engineering; Power (physics); Economics; Electrical engineering","score_opus":0.18075370767676752,"score_gpt":0.3473781601796783,"score_spread":0.1666244525029108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377024611","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017442963,0.95416635,0.035101194,0.0010925592,0.00032145315,0.000039815946,0.00014342347,0.00008543503,0.007305552],"genre_scores_gemma":[0.0172736,0.9628131,0.016870769,0.0003228418,0.00065239257,0.00006180777,0.00023130978,0.00004037357,0.0017337303],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934715,0.00014914316,0.000081985214,0.00018082517,0.00018787105,0.00005300572],"domain_scores_gemma":[0.9986058,0.0009206384,0.00014366295,0.00006196676,0.00023285065,0.00003514098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014834737,0.0014867292,0.0016502191,0.002436364,0.0003479102,0.002497387,0.0017028061,0.0013634897,0.002890345],"category_scores_gemma":[0.0018381526,0.0008574373,0.0014482829,0.0052146562,0.0008319661,0.003422709,0.0009888705,0.0016123626,0.0011997906],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089892135,0.00022230807,0.002268107,0.015732972,0.00024695892,0.00017476473,0.00021377791,0.038067684,0.0010690589,0.13740033,0.018485807,0.7860283],"study_design_scores_gemma":[0.00004164233,0.00032130908,0.004073019,0.009836133,0.000475425,0.0009415432,0.00055330596,0.082984656,0.0016285273,0.1317099,0.76720136,0.00023316932],"about_ca_topic_score_codex":0.003945999,"about_ca_topic_score_gemma":0.0030663176,"teacher_disagreement_score":0.003945999,"about_ca_system_score_codex":0.0015418233,"about_ca_system_score_gemma":0.0015335338,"threshold_uncertainty_score":0.011186779},"labels":[],"label_agreement":null},{"id":"W4378651459","doi":"10.1007/978-3-031-33979-0","title":"Sustainable Energy for Smart Cities","year":2023,"lang":"en","type":"book","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Instituto Politécnico de Bragança; Universidade do Minho; Universidade Federal de Pernambuco; Universidade do Estado de Santa Catarina; Trường Đại học Bách Khoa Hà Nội; Università di Bologna; Universidade Federal de Santa Maria; Universidade de Pernambuco; Universidade do Porto; Universidade de São Paulo; Università degli Studi di Cagliari; Universidade Federal do Rio de Janeiro; Université de Tunis; Universidade Federal da Paraíba; Universidade de Coimbra; Trường Đại học Giao thông vận tải; University of Ontario Institute of Technology; Vestas","keywords":"Sustainable energy; Energy (signal processing); Environmental economics; Architectural engineering; Business; Economics; Engineering; Renewable energy; Electrical engineering; Physics","score_opus":0.015965817104024782,"score_gpt":0.21505715301183256,"score_spread":0.19909133590780778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378651459","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001162602,0.06897892,0.0076582567,0.011443981,0.009657306,0.0000562825,0.00036330588,0.00030481417,0.9003746],"genre_scores_gemma":[0.010895706,0.038008988,0.0032776115,0.0020837956,0.0011117032,0.000048065922,0.00040580443,0.00023733656,0.943931],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99976975,0.000028424789,0.0000066870602,0.000032470765,0.00013769137,0.00002506334],"domain_scores_gemma":[0.99990475,0.00001871012,0.0000068935205,0.00001820048,0.00003344339,0.0000179111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002510599,0.001018547,0.00039135007,0.0009795774,0.00067756156,0.0023498647,0.00041282683,0.0011385161,0.03931838],"category_scores_gemma":[0.00038439283,0.0002903521,0.00032761865,0.0017986704,0.0006174843,0.0021010572,0.0014678128,0.0020114626,0.016453577],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019801233,0.00003920723,0.00012505817,0.00022624795,0.000013425774,0.000058142035,0.0001705563,0.0012032102,0.0009835564,0.1470198,0.6659893,0.18415178],"study_design_scores_gemma":[0.0000021923333,0.000006971275,0.000132032,0.00008415457,0.0000021814924,0.00003111909,0.00005109147,0.00021360247,0.00017437366,0.025608037,0.9736916,0.000002782391],"about_ca_topic_score_codex":0.0024535027,"about_ca_topic_score_gemma":0.009012313,"teacher_disagreement_score":0.03931838,"about_ca_system_score_codex":0.0013450711,"about_ca_system_score_gemma":0.0017319731,"threshold_uncertainty_score":0.13153309},"labels":[],"label_agreement":null},{"id":"W4378808134","doi":"10.18280/ijsdp.180527","title":"Empowering Sustainable Energy Communities in Thailand: Unveiling the Knowledge Transfer Process","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Sustainable energy; Knowledge transfer; Energy (signal processing); Business; Environmental resource management; Environmental planning; Environmental economics; Environmental science; Knowledge management; Engineering; Renewable energy; Computer science; Economics; Physics","score_opus":0.014167931376224985,"score_gpt":0.25603852571147373,"score_spread":0.24187059433524874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378808134","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93099266,0.0007027061,0.014744341,0.004196088,0.000041078547,0.00045714842,0.000033198852,0.000062853025,0.048770033],"genre_scores_gemma":[0.99559444,0.0003050277,0.0025393877,0.0001108786,0.0000062538215,0.00007285618,0.00001231659,0.0000057922907,0.0013529535],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98675424,0.009712794,0.00037338745,0.0004352337,0.001607198,0.0011172217],"domain_scores_gemma":[0.9792818,0.015061487,0.0018784194,0.0009013726,0.0015393515,0.0013375884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012358255,0.0003916574,0.0002547695,0.0018168801,0.0063790055,0.007560403,0.001108971,0.0014744588,0.0023219052],"category_scores_gemma":[0.019509701,0.0003117539,0.00031317188,0.0020102407,0.005585953,0.0071913325,0.010687888,0.0015942901,0.0002473774],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000148277,0.0005206465,0.03708254,0.00082147866,0.00004154288,0.00481181,0.70062894,0.0016759873,0.0031081082,0.019604305,0.0010751564,0.23048115],"study_design_scores_gemma":[0.000036244644,0.0003983629,0.01617316,0.0008721142,0.000039583298,0.0012667858,0.921186,0.004570171,0.0031780244,0.019042881,0.033171367,0.000065242035],"about_ca_topic_score_codex":0.004936116,"about_ca_topic_score_gemma":0.0074132206,"teacher_disagreement_score":0.012358255,"about_ca_system_score_codex":0.0042024236,"about_ca_system_score_gemma":0.012214016,"threshold_uncertainty_score":0.06535745},"labels":[],"label_agreement":null},{"id":"W4378906501","doi":"10.3390/en16114443","title":"Integrated Demand Response Programs in Energy Hubs: A Review of Applications, Classifications, Models and Future Directions","year":2023,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"Université Laval","keywords":"Demand response; Renewable energy; Environmental economics; Electricity; Greenhouse gas; Computer science; Electric power system; Energy consumption; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.05837437754148273,"score_gpt":0.2849221968615805,"score_spread":0.22654781932009777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378906501","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019065792,0.95849967,0.025757523,0.0015377812,0.0005283193,0.000047196165,0.00018879995,0.00009602396,0.011438042],"genre_scores_gemma":[0.02108295,0.963326,0.011400346,0.0004552571,0.00091058674,0.000071234565,0.00027543702,0.00004272242,0.0024355194],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99937195,0.00013900186,0.000066995024,0.00017066552,0.00018278124,0.00006865654],"domain_scores_gemma":[0.9986349,0.00086773315,0.00015361843,0.000057637244,0.00023707813,0.000049166403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013950127,0.001552867,0.0015977625,0.0024192343,0.00042890458,0.0031106682,0.002175616,0.0017671982,0.00437105],"category_scores_gemma":[0.0017996304,0.0008844563,0.0014988062,0.0052792476,0.0011014018,0.0043221163,0.0012329128,0.0016949155,0.0016824604],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104014,0.00022355202,0.0026253164,0.01676504,0.00021373776,0.0002818566,0.00037494945,0.039687455,0.0010619297,0.28045872,0.026745073,0.6314584],"study_design_scores_gemma":[0.000032160566,0.00023645391,0.0031377033,0.008549224,0.0002941876,0.00083677314,0.0006977264,0.055745922,0.0008227618,0.14387178,0.78557926,0.00019615398],"about_ca_topic_score_codex":0.0055727013,"about_ca_topic_score_gemma":0.0035742382,"teacher_disagreement_score":0.0055727013,"about_ca_system_score_codex":0.0022067628,"about_ca_system_score_gemma":0.0019469691,"threshold_uncertainty_score":0.016011238},"labels":[],"label_agreement":null},{"id":"W4379011114","doi":"10.1002/gas.22354","title":"Managing Peak Load in the Past, Present, and Future: Challenges and Opportunities for a Flexible Energy Future","year":2023,"lang":"en","type":"article","venue":"Climate and Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Distributed generation; Peak demand; Environmental economics; Renewable energy; Electricity generation; Base load power plant; Electrification; Electricity; Grid; Wind power; Business; Engineering; Power (physics); Economics; Electrical engineering","score_opus":0.041848341642612676,"score_gpt":0.22938365342559208,"score_spread":0.1875353117829794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379011114","genre_codex":"commentary","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04532961,0.087423526,0.20026007,0.4797743,0.0077140494,0.00017797032,0.0011738472,0.0023282643,0.17581837],"genre_scores_gemma":[0.7858649,0.065971926,0.09352665,0.02517857,0.004457729,0.00025183673,0.0012515729,0.0006305354,0.022866415],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99873,0.00035526263,0.00006502516,0.0002033346,0.00042258343,0.00022389535],"domain_scores_gemma":[0.99637336,0.0012394602,0.00025513745,0.0003004299,0.0008577707,0.0009738135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003572515,0.00067452184,0.0007176802,0.0006804324,0.002301715,0.008380057,0.002386654,0.0032876595,0.0071191364],"category_scores_gemma":[0.004586713,0.00034694272,0.00043727836,0.001318197,0.002483766,0.016385723,0.0061209854,0.004761579,0.0021861151],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015015862,0.00022774666,0.0046472456,0.0009806815,0.000070738606,0.00065722526,0.0021581096,0.034157097,0.00280175,0.3292267,0.16705497,0.45786765],"study_design_scores_gemma":[0.000017281052,0.00008384826,0.0019797317,0.0008170928,0.000032818698,0.0004584568,0.008353818,0.036771562,0.0007365383,0.4368546,0.5137581,0.00013612746],"about_ca_topic_score_codex":0.002850476,"about_ca_topic_score_gemma":0.005180209,"teacher_disagreement_score":0.008380057,"about_ca_system_score_codex":0.0019499655,"about_ca_system_score_gemma":0.003938545,"threshold_uncertainty_score":0.02381593},"labels":[],"label_agreement":null},{"id":"W4379116684","doi":"10.1109/tcomm.2023.3282220","title":"Power Control With QoS Guarantees: A Differentiable Projection-Based Unsupervised Learning Framework","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Projection (relational algebra); Differentiable function; Power control; Quality of service; Unsupervised learning; Control (management); Competitive learning; Power (physics); Artificial intelligence; Computer network; Mathematics; Algorithm","score_opus":0.014030329029693233,"score_gpt":0.22561910392406992,"score_spread":0.2115887748943767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379116684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058862213,0.00019609008,0.99191564,0.00016808035,0.000017808114,0.000014774726,0.000029296589,0.00015032841,0.0016217116],"genre_scores_gemma":[0.78358626,0.0008450584,0.20893177,0.0002761118,0.00013332465,0.00021045703,0.00018622144,0.00012958291,0.005701265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961144,0.00013812972,0.00001689022,0.00008118028,0.00010519234,0.00004712418],"domain_scores_gemma":[0.99940014,0.00031393443,0.00006879271,0.00005165324,0.00013176665,0.000033756216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090199057,0.00093152636,0.00077792397,0.00030113125,0.00026162324,0.0007186099,0.0013881703,0.0008801696,0.0012413509],"category_scores_gemma":[0.0018826787,0.00040037936,0.00042481092,0.000509842,0.0009296121,0.0012239703,0.0009745326,0.0018258396,0.00019296075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021450662,0.000024945432,0.00014593336,0.0000319741,0.000017901586,0.00003422263,0.000025398505,0.956977,0.0008773748,0.019644156,0.000641407,0.021558255],"study_design_scores_gemma":[0.0000015394199,0.000004097598,0.000008439932,0.0000011076411,0.0000011525677,0.000002537041,9.4966714e-7,0.99679595,0.00009212438,0.0029931036,0.00009806299,9.298027e-7],"about_ca_topic_score_codex":0.0041593653,"about_ca_topic_score_gemma":0.0039726547,"teacher_disagreement_score":0.0041593653,"about_ca_system_score_codex":0.00088598725,"about_ca_system_score_gemma":0.0014989533,"threshold_uncertainty_score":0.008270323},"labels":[],"label_agreement":null},{"id":"W4379470567","doi":"10.1109/access.2023.3282729","title":"PIoT: A Performance IoT Simulation System for a Large-Scale City-Wide Assessment","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Telefonaktiebolaget LM Ericsson","keywords":"Computer science; Scale (ratio); Internet of Things; Embedded system; Cartography; Geography","score_opus":0.029118735435410728,"score_gpt":0.30245996498361716,"score_spread":0.27334122954820644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379470567","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08152965,0.00020817228,0.74221176,0.00070102373,0.00050547917,0.0011699751,0.017625613,0.12552604,0.030522205],"genre_scores_gemma":[0.6330568,0.0005083032,0.30840594,0.00045764586,0.00009186892,0.0029321685,0.0336862,0.011570935,0.009290142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935025,0.00019374421,0.000076168064,0.00009820043,0.0002159117,0.000065769644],"domain_scores_gemma":[0.9983725,0.00069326354,0.0001027766,0.0002632423,0.0004026446,0.0001656295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017658394,0.0016108656,0.0009959029,0.0010111748,0.0006505412,0.0014709039,0.0027020152,0.0011500146,0.013069654],"category_scores_gemma":[0.0044650426,0.0008346237,0.0010358548,0.0010693388,0.0005169385,0.0015278639,0.0014452285,0.0018041297,0.0026507832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029333078,0.00025048552,0.005025763,0.00024988572,0.00014644855,0.00022908986,0.00027683866,0.9338537,0.0038097298,0.0077782287,0.028603224,0.019483337],"study_design_scores_gemma":[0.00005422752,0.000033797518,0.00033688959,0.000016641377,0.00001548001,0.00002188507,0.000024140087,0.9859067,0.0018791197,0.0016017684,0.010086742,0.00002263672],"about_ca_topic_score_codex":0.011991968,"about_ca_topic_score_gemma":0.0075395587,"teacher_disagreement_score":0.013069654,"about_ca_system_score_codex":0.001273679,"about_ca_system_score_gemma":0.0019826253,"threshold_uncertainty_score":0.04372239},"labels":[],"label_agreement":null},{"id":"W4379524693","doi":"10.1109/icps57144.2023.10142118","title":"Dynamic Microgrid Formation-Based Service Restoration Using Deep Reinforcement Learning in Distribution Networks","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Reinforcement learning; Computer science; Service (business); Distributed computing; Artificial intelligence","score_opus":0.00960932283631941,"score_gpt":0.2115547975634047,"score_spread":0.2019454747270853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379524693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15353784,0.00036809436,0.84175617,0.00038436486,0.000048266993,0.000049909886,0.000042314045,0.0007014623,0.0031115108],"genre_scores_gemma":[0.9833868,0.00005044008,0.015790107,0.00003184345,0.000006015803,0.000019247927,0.000019364437,0.000012017759,0.000684126],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998386,0.00004854381,0.0000072217817,0.00003762095,0.000028919516,0.000039005678],"domain_scores_gemma":[0.9996265,0.00017703151,0.000061021314,0.000027522592,0.00007139907,0.000036522586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059269834,0.0004605172,0.0005103233,0.00017428075,0.00030330085,0.00039913034,0.00068995473,0.00042027843,0.00074394926],"category_scores_gemma":[0.0011481035,0.0002727284,0.00027020465,0.00018416524,0.0006112908,0.00053596694,0.0006287292,0.00078968535,0.00008617633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022035627,0.00002051687,0.00036161506,0.000009823488,0.000007135973,0.000022349705,0.000016589529,0.9866911,0.0005591374,0.0010338491,0.00016683097,0.011089042],"study_design_scores_gemma":[0.0000014482475,0.0000044681888,0.000025429334,5.261944e-7,7.3455163e-7,0.000001380422,0.0000012597313,0.9995403,0.00009398294,0.00030420895,0.000025648289,6.5847235e-7],"about_ca_topic_score_codex":0.016157981,"about_ca_topic_score_gemma":0.011497361,"teacher_disagreement_score":0.016157981,"about_ca_system_score_codex":0.0010026619,"about_ca_system_score_gemma":0.0009494736,"threshold_uncertainty_score":0.032127857},"labels":[],"label_agreement":null},{"id":"W4379618410","doi":"10.32920/23332223.v1","title":"Optimal Energy Storage Solution to Reduce Electricity Bills for Class-A Customers in Ontario","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Electricity; Volatility (finance); Revenue; Purchasing; Work (physics); Economics; Business; Microeconomics; Operations management; Finance; Engineering; Electrical engineering","score_opus":0.02893685028678353,"score_gpt":0.23746873595292034,"score_spread":0.2085318856661368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379618410","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89086163,0.00030280967,0.034119356,0.0012302514,0.00008544753,0.00022967151,0.0009536657,0.00037718695,0.07183991],"genre_scores_gemma":[0.98729974,0.00006501258,0.0030742178,0.000031500425,0.0000057436823,0.000014534697,0.00016974796,0.000021393655,0.0093181655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998759,0.000012077152,0.0000037682084,0.000017192602,0.000035758963,0.000055188055],"domain_scores_gemma":[0.99990237,0.000019079373,0.000008422522,0.000004584839,0.0000446062,0.000020867563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013467982,0.000284826,0.00035255574,0.0002471676,0.0008655586,0.00085612905,0.0006316882,0.00038450974,0.008545914],"category_scores_gemma":[0.00043033427,0.00016440195,0.00022950803,0.00047040853,0.0002256987,0.00035834388,0.00030339282,0.00024865338,0.00024517116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013920902,0.00046985643,0.015028689,0.00019239528,0.000083112456,0.0008599457,0.00044231527,0.78944725,0.016975647,0.022051929,0.03323454,0.119822204],"study_design_scores_gemma":[0.00014365364,0.00013176315,0.012819831,0.000010056428,0.0000341935,0.000055369575,0.00063585106,0.97281986,0.0023727685,0.0031562268,0.007799565,0.000020793514],"about_ca_topic_score_codex":0.62225485,"about_ca_topic_score_gemma":0.79978895,"teacher_disagreement_score":0.37774515,"about_ca_system_score_codex":0.0058566923,"about_ca_system_score_gemma":0.006621462,"threshold_uncertainty_score":0.75993955},"labels":[],"label_agreement":null},{"id":"W4379739979","doi":"10.32920/23332223","title":"Optimal Energy Storage Solution to Reduce Electricity Bills for Class-A Customers in Ontario","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Electricity; Volatility (finance); Revenue; Purchasing; Work (physics); Economics; Business; Microeconomics; Operations management; Finance; Engineering; Electrical engineering","score_opus":0.02893685028678353,"score_gpt":0.23746873595292034,"score_spread":0.2085318856661368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379739979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89086163,0.00030280967,0.034119356,0.0012302514,0.00008544753,0.00022967151,0.0009536657,0.00037718695,0.07183991],"genre_scores_gemma":[0.98729974,0.00006501258,0.0030742178,0.000031500425,0.0000057436823,0.000014534697,0.00016974796,0.000021393655,0.0093181655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998759,0.000012077152,0.0000037682084,0.000017192602,0.000035758963,0.000055188055],"domain_scores_gemma":[0.99990237,0.000019079373,0.000008422522,0.000004584839,0.0000446062,0.000020867563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013467982,0.000284826,0.00035255574,0.0002471676,0.0008655586,0.00085612905,0.0006316882,0.00038450974,0.008545914],"category_scores_gemma":[0.00043033427,0.00016440195,0.00022950803,0.00047040853,0.0002256987,0.00035834388,0.00030339282,0.00024865338,0.00024517116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013920902,0.00046985643,0.015028689,0.00019239528,0.000083112456,0.0008599457,0.00044231527,0.78944725,0.016975647,0.022051929,0.03323454,0.119822204],"study_design_scores_gemma":[0.00014365364,0.00013176315,0.012819831,0.000010056428,0.0000341935,0.000055369575,0.00063585106,0.97281986,0.0023727685,0.0031562268,0.007799565,0.000020793514],"about_ca_topic_score_codex":0.62225485,"about_ca_topic_score_gemma":0.79978895,"teacher_disagreement_score":0.37774515,"about_ca_system_score_codex":0.0058566923,"about_ca_system_score_gemma":0.006621462,"threshold_uncertainty_score":0.75993955},"labels":[],"label_agreement":null},{"id":"W4379801371","doi":"10.1287/stsy.2022.004","title":"Optimally Scheduling Public Safety Power Shutoffs","year":2023,"lang":"en","type":"article","venue":"Stochastic Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Operations research; Scheduling (production processes); Computer science; Grid; Work (physics); Economics; Operations management; Engineering; Mathematics","score_opus":0.015726680109394802,"score_gpt":0.2051824507730204,"score_spread":0.1894557706636256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379801371","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6604542,0.00049849245,0.31183344,0.0013285446,0.00019357583,0.000309468,0.0005401917,0.00078126026,0.024060806],"genre_scores_gemma":[0.98516625,0.000101229045,0.0120664155,0.000069419344,0.000019446377,0.000042180924,0.0001348791,0.00004595135,0.002354177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993467,0.00015584783,0.000017008724,0.00010976867,0.00007021309,0.0003005051],"domain_scores_gemma":[0.99851114,0.00078916736,0.00021576085,0.00006023029,0.00014102252,0.00028257395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008888833,0.0008292245,0.001130051,0.000316139,0.00048653685,0.0013141199,0.0010106311,0.0009875477,0.006395628],"category_scores_gemma":[0.0029679607,0.0006398515,0.0003416292,0.000329752,0.00064139103,0.0010382017,0.000713909,0.0012138995,0.00041319558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034897064,0.00016702537,0.0011502482,0.000060148916,0.000023268758,0.00007740424,0.000048735255,0.97466964,0.0020703212,0.0064741066,0.0018513006,0.0130588235],"study_design_scores_gemma":[0.000032786204,0.000075296186,0.00034007794,0.000005653988,0.000008499922,0.000012474264,0.00005765462,0.99494463,0.00051507377,0.0034946026,0.00050791836,0.0000052511928],"about_ca_topic_score_codex":0.010102987,"about_ca_topic_score_gemma":0.009914465,"teacher_disagreement_score":0.010102987,"about_ca_system_score_codex":0.0016932953,"about_ca_system_score_gemma":0.0025031,"threshold_uncertainty_score":0.021395564},"labels":[],"label_agreement":null},{"id":"W4381189194","doi":"10.24018/ejece.2023.7.3.489","title":"Open Source SCADA System for Hybrid Power System for Francois, NL","year":2023,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Open source; Arduino; SCADA; Electrical engineering; Battery (electricity); Energy source; Power (physics); Computer science; Computer hardware; Generator (circuit theory); Embedded system; Engineering; Renewable energy; Operating system; Software; Physics","score_opus":0.0076955562950805296,"score_gpt":0.18549211445189662,"score_spread":0.17779655815681608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381189194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027658451,0.0018286651,0.41409308,0.000915779,0.000767088,0.0010037312,0.0447418,0.3541293,0.154862],"genre_scores_gemma":[0.4860329,0.0018649931,0.13358162,0.0007508605,0.00046531414,0.0021878635,0.1445639,0.02151512,0.20903747],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919826,0.0001641302,0.00009259394,0.00020314785,0.00026052305,0.000081479404],"domain_scores_gemma":[0.9986524,0.00015765367,0.00015420663,0.00028216498,0.0006259713,0.00012765393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012038144,0.0012137995,0.0005775168,0.0015316535,0.00055061345,0.0014621448,0.0007712591,0.00048058736,0.053443264],"category_scores_gemma":[0.0020069191,0.00025192453,0.0002707036,0.00096224964,0.00024584885,0.0011365196,0.00079057645,0.0007241291,0.030397218],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011625505,0.00017131054,0.010281486,0.00071456435,0.00016833679,0.00067480706,0.0009257508,0.00872078,0.020047469,0.012254984,0.46208918,0.48278868],"study_design_scores_gemma":[0.00033584627,0.00018315036,0.011973159,0.00025953824,0.000065899614,0.00043789245,0.00014059643,0.062120046,0.01101165,0.0045778397,0.90876895,0.00012544321],"about_ca_topic_score_codex":0.0073495233,"about_ca_topic_score_gemma":0.004364868,"teacher_disagreement_score":0.99265045,"about_ca_system_score_codex":0.00077110546,"about_ca_system_score_gemma":0.0010045393,"threshold_uncertainty_score":0.17878556},"labels":[],"label_agreement":null},{"id":"W4381335354","doi":"10.24084/repqj21.263","title":"Energy Flows Optimization in a Renewable Energy Community with Storage Systems Integration","year":2023,"lang":"en","type":"article","venue":"Renewable Energy and Power Quality Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Renewable energy; Environmental economics; Tariff; Energy (signal processing); Energy storage; Business; Computer science; Economics; Engineering; International trade; Electrical engineering","score_opus":0.019250761940831168,"score_gpt":0.22957138901087037,"score_spread":0.2103206270700392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381335354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6029567,0.000714713,0.36543158,0.0010887103,0.00012282742,0.00018894064,0.00028272704,0.00027571528,0.028938],"genre_scores_gemma":[0.98571235,0.00010741651,0.009522386,0.000038493552,0.00001574448,0.00005130768,0.00004715168,0.000027273532,0.0044778804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995864,0.00019390331,0.000010109375,0.00005820046,0.00006892663,0.00008245159],"domain_scores_gemma":[0.9994272,0.00029785975,0.00007358764,0.000020457714,0.0001124357,0.00006837857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010218449,0.00073035446,0.0010693235,0.00061927974,0.00068929023,0.0017234604,0.00090884767,0.0015407475,0.0033561862],"category_scores_gemma":[0.001435403,0.00049199566,0.00089964696,0.0008134766,0.00064636715,0.0012065603,0.0013192458,0.0009090802,0.0002301773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045827983,0.00005972976,0.00030068957,0.000015537544,0.000017833552,0.00008017627,0.000010342038,0.99412954,0.00036199746,0.0026888289,0.00017291638,0.0021167204],"study_design_scores_gemma":[0.000006714717,0.000022882708,0.00006527548,0.0000015784358,0.0000045069733,0.0000063765597,0.000013372352,0.9989471,0.00007678001,0.00076423184,0.000088755696,0.0000024357646],"about_ca_topic_score_codex":0.010779822,"about_ca_topic_score_gemma":0.0077173174,"teacher_disagreement_score":0.010779822,"about_ca_system_score_codex":0.0011959836,"about_ca_system_score_gemma":0.0013747265,"threshold_uncertainty_score":0.021434188},"labels":[],"label_agreement":null},{"id":"W4381431754","doi":"10.1287/stsy.2022.0004","title":"Optimally Scheduling Public Safety Power Shutoffs","year":2023,"lang":"en","type":"article","venue":"Stochastic Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Office of the President, University of California; Natural Sciences and Engineering Research Council of Canada; Advanced Research Projects Agency; Institut de Valorisation des Données; National Science Foundation","keywords":"Operations research; Scheduling (production processes); Computer science; Grid; Work (physics); Economics; Operations management; Engineering; Mathematics","score_opus":0.015726680109394802,"score_gpt":0.2051824507730204,"score_spread":0.1894557706636256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381431754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6604542,0.00049849245,0.31183344,0.0013285446,0.00019357583,0.000309468,0.0005401917,0.00078126026,0.024060806],"genre_scores_gemma":[0.98516625,0.000101229045,0.0120664155,0.000069419344,0.000019446377,0.000042180924,0.0001348791,0.00004595135,0.002354177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993467,0.00015584783,0.000017008724,0.00010976867,0.00007021309,0.0003005051],"domain_scores_gemma":[0.99851114,0.00078916736,0.00021576085,0.00006023029,0.00014102252,0.00028257395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008888833,0.0008292245,0.001130051,0.000316139,0.00048653685,0.0013141199,0.0010106311,0.0009875477,0.006395628],"category_scores_gemma":[0.0029679607,0.0006398515,0.0003416292,0.000329752,0.00064139103,0.0010382017,0.000713909,0.0012138995,0.00041319558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034897064,0.00016702537,0.0011502482,0.000060148916,0.000023268758,0.00007740424,0.000048735255,0.97466964,0.0020703212,0.0064741066,0.0018513006,0.0130588235],"study_design_scores_gemma":[0.000032786204,0.000075296186,0.00034007794,0.000005653988,0.000008499922,0.000012474264,0.00005765462,0.99494463,0.00051507377,0.0034946026,0.00050791836,0.0000052511928],"about_ca_topic_score_codex":0.010102987,"about_ca_topic_score_gemma":0.009914465,"teacher_disagreement_score":0.010102987,"about_ca_system_score_codex":0.0016932953,"about_ca_system_score_gemma":0.0025031,"threshold_uncertainty_score":0.021395564},"labels":[],"label_agreement":null},{"id":"W4381855600","doi":"10.3389/fenrg.2023.1229000","title":"Editorial: Recent advances of edge computing for smart grid","year":2023,"lang":"en","type":"editorial","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor; University of Alberta","funders":"","keywords":"Enhanced Data Rates for GSM Evolution; Computer science; Smart grid; Grid; Engineering physics; Nanotechnology; Physics; Materials science; Engineering; Electrical engineering; Telecommunications; Geology","score_opus":0.02212165256982824,"score_gpt":0.3124666985653133,"score_spread":0.29034504599548505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381855600","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000024130393,0.0036851524,0.00011371806,0.017774135,0.97582555,0.000017376393,0.00007445355,0.00006912336,0.0024163083],"genre_scores_gemma":[0.00033517455,0.0041263537,0.000079792255,0.010631507,0.97266924,0.0000154705,0.000053001142,0.00004692722,0.012042556],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967258,0.00040255513,0.00035228961,0.00045216875,0.0017917841,0.00027536936],"domain_scores_gemma":[0.98737943,0.0034435405,0.0008489427,0.0003467948,0.0055547496,0.002426649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041352697,0.004408813,0.003139994,0.0033794476,0.0024958134,0.007110308,0.0030542456,0.009508899,0.035084534],"category_scores_gemma":[0.015403581,0.0008442638,0.0024108076,0.0014881926,0.0016109615,0.004475228,0.001345688,0.012996834,0.030092437],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002343271,0.0000066317434,0.000010091787,0.000106116306,0.00000680436,0.00004360939,0.0000035048765,0.00001961665,0.00003223169,0.00016250207,0.9960866,0.0034988672],"study_design_scores_gemma":[0.000050525123,0.000025220208,0.00016023168,0.00027329312,0.000028446686,0.00019134126,0.000022218623,0.00012907581,0.000109116474,0.0010321334,0.997964,0.000014304765],"about_ca_topic_score_codex":0.0008921101,"about_ca_topic_score_gemma":0.002736069,"teacher_disagreement_score":0.035084534,"about_ca_system_score_codex":0.0019049812,"about_ca_system_score_gemma":0.0020624814,"threshold_uncertainty_score":0.11736947},"labels":[],"label_agreement":null},{"id":"W4381894102","doi":"10.1109/iccad57653.2023.10152358","title":"Smart Agent-Based Direct Load Control of Air Conditioner Populations in Demand Side Management","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Air conditioning; Computer science; Demand response; Controller (irrigation); Electric power system; Load management; Renewable energy; Reliability (semiconductor); Control engineering; Process (computing); Operator (biology); Grid; Reliability engineering; Automotive engineering; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.01684209549960463,"score_gpt":0.22898632154681403,"score_spread":0.2121442260472094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381894102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16951305,0.00023307468,0.8190734,0.00029177908,0.00013278601,0.00014810411,0.000071558185,0.0012005148,0.009335715],"genre_scores_gemma":[0.9842721,0.000036309135,0.014490369,0.000027452908,0.000010713141,0.000040290794,0.000017358047,0.000014790834,0.0010905677],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998165,0.000054551325,0.000010042382,0.000041108753,0.000046559002,0.0000312914],"domain_scores_gemma":[0.9994344,0.00024299399,0.00008317498,0.000057794732,0.00013214845,0.000049529965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048846996,0.00036858016,0.00050231925,0.00025263603,0.00035433483,0.00074308837,0.00079486065,0.00042151462,0.001743251],"category_scores_gemma":[0.0011053439,0.00021691022,0.00021640846,0.00014438701,0.00048401745,0.00086211314,0.00064815884,0.00051159353,0.0002456588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011396999,0.00012382185,0.00081728457,0.000034990164,0.000029847493,0.00006695881,0.00006498101,0.96610963,0.005747311,0.005616711,0.00060300046,0.020671504],"study_design_scores_gemma":[0.000006578174,0.000014542925,0.00006212107,7.171787e-7,0.0000020607536,0.0000029352184,0.0000030873682,0.99897337,0.0003387572,0.00044502495,0.00014908637,0.0000017059207],"about_ca_topic_score_codex":0.0044637453,"about_ca_topic_score_gemma":0.004942631,"teacher_disagreement_score":0.0044637453,"about_ca_system_score_codex":0.00044259444,"about_ca_system_score_gemma":0.00054971466,"threshold_uncertainty_score":0.008875489},"labels":[],"label_agreement":null},{"id":"W4382239995","doi":"10.1609/aaai.v37i4.25636","title":"MSDC: Exploiting Multi-State Power Consumption in Non-intrusive Load Monitoring Based on a Dual-CNN Model","year":2023,"lang":"en","type":"article","venue":"Proceedings of the AAAI Conference on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"National Natural Science Foundation of China","keywords":"Conditional random field; Computer science; Dual (grammatical number); State (computer science); Generalization; Power consumption; Artificial intelligence; Power (physics); Machine learning; Algorithm; Mathematics","score_opus":0.08998531909022335,"score_gpt":0.2933630415716923,"score_spread":0.20337772248146896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382239995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16331312,0.0014628237,0.81991553,0.00081368256,0.00020309577,0.000076422475,0.0011713034,0.004792731,0.008251243],"genre_scores_gemma":[0.9323702,0.00034074148,0.0570918,0.00029740104,0.00005158665,0.000063154854,0.0013588608,0.00009029379,0.008335984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998983,0.000010619389,0.0000037937718,0.000045277142,0.000020514786,0.000021480928],"domain_scores_gemma":[0.9998783,0.00003792761,0.000016647351,0.000023421653,0.00003329237,0.000010444416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002633937,0.0008389845,0.0004584477,0.00036058764,0.00015899497,0.00044940796,0.0012098075,0.0005018983,0.0013844406],"category_scores_gemma":[0.0005811764,0.00036755542,0.00042136377,0.00037285697,0.0002723729,0.0009027481,0.000540508,0.0009547045,0.00035923335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024142404,0.00016199543,0.004082525,0.00007475538,0.00010810091,0.00016460895,0.00004726734,0.7521385,0.009771871,0.004592068,0.0059885406,0.22262836],"study_design_scores_gemma":[0.0000019973857,0.000006766329,0.00017973602,0.0000017922473,0.0000046679143,0.0000072171592,0.0000013028783,0.9984365,0.0006667077,0.0005012182,0.00019019842,0.0000017983888],"about_ca_topic_score_codex":0.01311674,"about_ca_topic_score_gemma":0.021113763,"teacher_disagreement_score":0.01311674,"about_ca_system_score_codex":0.0007482725,"about_ca_system_score_gemma":0.0006210074,"threshold_uncertainty_score":0.026080787},"labels":[],"label_agreement":null},{"id":"W4382364472","doi":"10.1016/j.renene.2023.118975","title":"Development of energy aggregators for virtual communities: The energy efficiency-flexibility nexus for demand response","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Demand response; News aggregator; Flexibility (engineering); Renewable energy; Energy management; Load shifting; Computer science; Environmental economics; Energy consumption; Efficient energy use; Demand management; Photovoltaic system; Electricity; Engineering; Energy (signal processing); Economics","score_opus":0.024445302078330157,"score_gpt":0.23721278587503944,"score_spread":0.2127674837967093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382364472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16299394,0.00040509924,0.7609903,0.005565538,0.0003843106,0.0006239866,0.00021008044,0.0024700128,0.066356726],"genre_scores_gemma":[0.78110665,0.0003003717,0.20825386,0.00025464827,0.000046773985,0.00020991612,0.00029800576,0.00012515184,0.009404627],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99874663,0.0007007976,0.000036035297,0.00016041897,0.00023515004,0.000120914265],"domain_scores_gemma":[0.9977915,0.0003895575,0.00014020131,0.0005648815,0.0006632404,0.0004505505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002740994,0.0004051825,0.00020104442,0.0003579166,0.0007470104,0.002076235,0.0016332865,0.00077255775,0.004381442],"category_scores_gemma":[0.004407459,0.00026164768,0.0003472599,0.00043881958,0.00070543145,0.0039314786,0.003394865,0.0012040569,0.0011802601],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034917472,0.0012537367,0.013544421,0.00033816329,0.000121060526,0.00054239936,0.0015809685,0.1518172,0.022114145,0.32298267,0.025819166,0.45953694],"study_design_scores_gemma":[0.00010956398,0.0006411132,0.0025670405,0.00014231031,0.000057781326,0.000287444,0.0018805172,0.7495367,0.020360114,0.110868126,0.11349334,0.000055848162],"about_ca_topic_score_codex":0.0016508263,"about_ca_topic_score_gemma":0.0031927044,"teacher_disagreement_score":0.004381442,"about_ca_system_score_codex":0.00074666267,"about_ca_system_score_gemma":0.0027878468,"threshold_uncertainty_score":0.014657378},"labels":[],"label_agreement":null},{"id":"W4382468088","doi":"10.1109/access.2023.3290909","title":"Hedging Investments of Grid-Connected PV-BESS in Buildings Using Cryptocurrency Mining: A Case Study in Finland","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Apartment; Investment (military); Environmental science; Dispatchable generation; Electricity; Grid; Computer science; Automotive engineering; Business; Distributed generation; Civil engineering; Engineering; Electrical engineering; Economics","score_opus":0.07996899422293294,"score_gpt":0.3376155358785572,"score_spread":0.2576465416556243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382468088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99483335,0.00034279985,0.0011234606,0.00029610522,0.000011923325,0.000038182705,0.0019517336,0.000047076428,0.0013552497],"genre_scores_gemma":[0.9954666,0.00018855931,0.0015333616,0.00003690965,0.000013097212,0.000016683736,0.0019926177,0.0000072800813,0.00074484886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994555,0.00016168531,0.000038793227,0.00012012168,0.00011498812,0.00010887593],"domain_scores_gemma":[0.99760014,0.0015798903,0.00029544946,0.00017365628,0.00017356209,0.00017744025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009514033,0.00062982907,0.00049011613,0.00088536274,0.00062873727,0.0010402357,0.0012316422,0.0017729535,0.0011046628],"category_scores_gemma":[0.002339488,0.0002395685,0.0006585355,0.0016794757,0.0006196107,0.0011125051,0.0005587669,0.00066446635,0.00019393189],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019852156,0.001976373,0.25582585,0.00068702607,0.00045031746,0.016778499,0.00081675197,0.6528551,0.0058773933,0.006345115,0.012201032,0.044201367],"study_design_scores_gemma":[0.00044611545,0.0007913677,0.24751867,0.00009805435,0.00022957177,0.0017285373,0.0035227048,0.72429615,0.006315302,0.004427799,0.010463367,0.00016245391],"about_ca_topic_score_codex":0.02326312,"about_ca_topic_score_gemma":0.03028788,"teacher_disagreement_score":0.02326312,"about_ca_system_score_codex":0.0015666501,"about_ca_system_score_gemma":0.00057204557,"threshold_uncertainty_score":0.04625547},"labels":[],"label_agreement":null},{"id":"W4382812750","doi":"10.1007/s10287-023-00456-0","title":"Optimal allocation of demand response considering transmission system congestion","year":2023,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Computer science; Scheduling (production processes); News aggregator; Grid; Operations research; Mathematical optimization; Smart grid; Electricity","score_opus":0.013457165162797562,"score_gpt":0.23107656561281498,"score_spread":0.2176194004500174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382812750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23081736,0.00049290486,0.74362034,0.0012229005,0.00012445934,0.00019907329,0.00032161636,0.0002919927,0.022909354],"genre_scores_gemma":[0.980298,0.00009675824,0.016597621,0.000063349,0.000018787983,0.00005521969,0.00006153542,0.000039749248,0.002768841],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937147,0.00031808784,0.00001715236,0.000072011055,0.0000648051,0.00015650659],"domain_scores_gemma":[0.99884653,0.0007210573,0.0001247073,0.00003774583,0.0001725906,0.00009742445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013587426,0.00074736355,0.0010012735,0.00044530883,0.00033683286,0.0015216229,0.000744727,0.0012985021,0.0038200172],"category_scores_gemma":[0.0030128604,0.0006156358,0.0004334858,0.00051738264,0.0007043103,0.00094871706,0.0008276957,0.0010773414,0.00019880725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040935913,0.000022320812,0.000111962676,0.000022885944,0.000008090278,0.000031569114,0.000011623921,0.9955491,0.00042438932,0.0020977415,0.00030103538,0.0013783963],"study_design_scores_gemma":[0.0000074146906,0.000016243137,0.00003944255,0.0000019489228,0.0000026813823,0.0000028846453,0.0000103281345,0.9990361,0.00010068349,0.00068590604,0.00009455398,0.0000019127096],"about_ca_topic_score_codex":0.008948208,"about_ca_topic_score_gemma":0.0051239454,"teacher_disagreement_score":0.008948208,"about_ca_system_score_codex":0.0015070919,"about_ca_system_score_gemma":0.0013425958,"threshold_uncertainty_score":0.017792225},"labels":[],"label_agreement":null},{"id":"W4382936323","doi":"10.23919/acc55779.2023.10156533","title":"A novel scheme for randomized customer-sensitivity-based control of thermostatic loads for better integration of intermittent renewables","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Probabilistic logic; Grid; Controllability; Thermostat; Renewable energy; News aggregator; Demand response; Distributed computing; Engineering; Electricity","score_opus":0.01611224869667828,"score_gpt":0.2359497467344372,"score_spread":0.21983749803775893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382936323","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017295904,0.000063556516,0.97831637,0.00024417948,0.00007504173,0.00009329747,0.000042906417,0.00036002,0.0035086877],"genre_scores_gemma":[0.9253077,0.00006455869,0.07149111,0.00017934441,0.000064907734,0.00013673645,0.000039115246,0.000064806605,0.0026518216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980374,0.0005745049,0.00011087848,0.0004972071,0.00056125276,0.00021878112],"domain_scores_gemma":[0.9971103,0.001205378,0.0005255361,0.000570943,0.00036887816,0.00021902443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019181746,0.0006487101,0.0007429304,0.00033238207,0.00076930725,0.0010999045,0.0023941624,0.00094710547,0.0037682373],"category_scores_gemma":[0.0055438466,0.00036569408,0.0005003564,0.00043142584,0.0013868627,0.0014834915,0.0024108745,0.0014386805,0.00046824774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072507345,0.00027456405,0.0009241804,0.00014853192,0.00008670998,0.00038161982,0.0003797713,0.6352557,0.05614516,0.23315549,0.0043673655,0.06815581],"study_design_scores_gemma":[0.000023208595,0.00006975429,0.00007831295,0.000005273614,0.000006397709,0.000042336575,0.000007415487,0.9874879,0.0022816272,0.00902275,0.0009578387,0.000017144916],"about_ca_topic_score_codex":0.0010286566,"about_ca_topic_score_gemma":0.0012900868,"teacher_disagreement_score":0.0037682373,"about_ca_system_score_codex":0.0010566204,"about_ca_system_score_gemma":0.0010624643,"threshold_uncertainty_score":0.012606025},"labels":[],"label_agreement":null},{"id":"W4383040766","doi":"10.2139/ssrn.4499676","title":"Effectiveness: Demand Response Programs Comparing Price Signals and Direct Load Control","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Control (management); Computer science; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.01197873056109046,"score_gpt":0.22981999777697032,"score_spread":0.21784126721587985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383040766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96910053,0.0004725701,0.015060055,0.0006096185,0.00021981476,0.00037967222,0.0003754916,0.00083627645,0.01294597],"genre_scores_gemma":[0.99305505,0.00008496567,0.004551667,0.0001568581,0.000044809305,0.00010571235,0.00014280663,0.000073338095,0.0017847563],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99590683,0.0027392488,0.00015449047,0.0004342197,0.0005167304,0.0002485149],"domain_scores_gemma":[0.97264093,0.023591518,0.0009882838,0.0010105774,0.0010749106,0.00069361675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005386161,0.00084250903,0.0010231809,0.0010371933,0.0003495754,0.0012708845,0.001069001,0.0015048827,0.011960833],"category_scores_gemma":[0.021233464,0.0002813476,0.00046142837,0.0006022528,0.0005308487,0.002371039,0.0008483475,0.0008556838,0.0007668684],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.19847272,0.02859396,0.01790478,0.0012381856,0.00085402024,0.00019620017,0.00035015307,0.15114537,0.018699564,0.0071294126,0.0050538043,0.5703618],"study_design_scores_gemma":[0.025917122,0.0889612,0.032097902,0.00019585344,0.0023900212,0.00029661084,0.0012699458,0.76500094,0.0637792,0.0144242775,0.005493556,0.00017326271],"about_ca_topic_score_codex":0.0021776834,"about_ca_topic_score_gemma":0.0015535147,"teacher_disagreement_score":0.011960833,"about_ca_system_score_codex":0.0009290432,"about_ca_system_score_gemma":0.0011832792,"threshold_uncertainty_score":0.040012956},"labels":[],"label_agreement":null},{"id":"W4383163694","doi":"10.1016/j.epsr.2023.109644","title":"Non-intrusive load monitoring: Comparative analysis of transient state clustering methods","year":2023,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Cluster analysis; Computer science; Transient (computer programming); Data mining; Algorithm; Data stream clustering; Correlation clustering; CURE data clustering algorithm; Artificial intelligence","score_opus":0.07768111925133246,"score_gpt":0.4038298559469589,"score_spread":0.32614873669562644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383163694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3979042,0.0030576258,0.5907271,0.00023035312,0.000104522245,0.00020190486,0.00027534293,0.001241223,0.0062576444],"genre_scores_gemma":[0.94032264,0.0006806417,0.057312034,0.00002454,0.00004794501,0.000053902375,0.00026716953,0.00007466522,0.0012164037],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99850804,0.0007017907,0.00007169247,0.00015089,0.00048025468,0.00008732194],"domain_scores_gemma":[0.98920244,0.008100229,0.00045083062,0.0007544436,0.001367213,0.0001248161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002868387,0.00061212014,0.0008409507,0.0020222813,0.000380455,0.00080390007,0.0010538001,0.00057946396,0.0012216199],"category_scores_gemma":[0.009831851,0.00019213735,0.00052579655,0.0016205822,0.00029028757,0.0012770474,0.0005919481,0.0004160084,0.00023493054],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003266935,0.00067229563,0.021106796,0.00074950844,0.00063114666,0.00009477073,0.00054078386,0.27579913,0.010901243,0.0066545475,0.0016542501,0.6779287],"study_design_scores_gemma":[0.000033322853,0.0003316527,0.01703991,0.000029883435,0.00013233272,0.00009728864,0.0001463797,0.9750378,0.005147671,0.0013081372,0.00066906714,0.000026471773],"about_ca_topic_score_codex":0.004663531,"about_ca_topic_score_gemma":0.0055144415,"teacher_disagreement_score":0.004663531,"about_ca_system_score_codex":0.0006660498,"about_ca_system_score_gemma":0.00053580734,"threshold_uncertainty_score":0.0151696205},"labels":[],"label_agreement":null},{"id":"W4383619748","doi":"10.1007/978-3-031-32828-2_7","title":"Demand Side Management and Transactive Energy Strategies for Smart Cities","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in big data","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Stakeholder; Environmental economics; Business; Process management; Grid; Computer science; Risk analysis (engineering); Economics; Engineering; Political science; Public relations","score_opus":0.14657888858299187,"score_gpt":0.282907985968813,"score_spread":0.13632909738582114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383619748","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020375468,0.023024494,0.07726923,0.025496697,0.001125003,0.000059815506,0.00015526994,0.00018804873,0.852306],"genre_scores_gemma":[0.535218,0.024790976,0.017950159,0.0028405183,0.00066507387,0.000076461685,0.00017411553,0.0002128636,0.41807187],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99979323,0.00006466208,0.0000056325443,0.000030135228,0.000071519615,0.000034929813],"domain_scores_gemma":[0.99981433,0.00009650643,0.000009639775,0.000024651032,0.000036622445,0.000018311475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004682629,0.0005477121,0.00026249047,0.0003129307,0.00058980915,0.0041568554,0.00065536116,0.0012065092,0.0092769535],"category_scores_gemma":[0.0005034781,0.00021997644,0.0003116368,0.0010593857,0.0012840617,0.004761044,0.0012210627,0.0019013671,0.0010577857],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017147348,0.00005401973,0.0002096181,0.00010156005,0.000011315422,0.000059040078,0.0006094399,0.01109507,0.0006044355,0.9002917,0.030165574,0.056781203],"study_design_scores_gemma":[0.0000063880107,0.000020837373,0.0003413828,0.00012490818,0.000008160601,0.00006868885,0.0018663822,0.019079365,0.0008113708,0.6805249,0.2971333,0.00001428404],"about_ca_topic_score_codex":0.0028739308,"about_ca_topic_score_gemma":0.0068729734,"teacher_disagreement_score":0.0092769535,"about_ca_system_score_codex":0.0020730125,"about_ca_system_score_gemma":0.0011733673,"threshold_uncertainty_score":0.03103453},"labels":[],"label_agreement":null},{"id":"W4383824969","doi":"10.23977/jeeem.2023.060310","title":"Optimized Particle Swarm Algorithm for Advanced Bi-Level Dispatch in New Energy Power Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Electrotechnology Electrical Engineering and Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Computer science; Scheduling (production processes); Photovoltaic system; Inertia; Entropy (arrow of time); Electricity generation; Power (physics); Engineering; Algorithm; Mathematics","score_opus":0.006505220752423151,"score_gpt":0.1967751218376978,"score_spread":0.19026990108527464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383824969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0064008497,0.00010492292,0.9916025,0.00007219208,0.00004716846,0.00003170633,0.000022163185,0.00013661044,0.0015820226],"genre_scores_gemma":[0.4109055,0.0002399687,0.5830206,0.00010301416,0.000077562596,0.00029369575,0.00017589534,0.00011023237,0.0050735115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970573,0.00010898215,0.00001637484,0.00004739681,0.00009212179,0.00002938313],"domain_scores_gemma":[0.9997086,0.00013427284,0.00004062172,0.000023280285,0.00007229087,0.000020863876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007944752,0.00068733445,0.0007827157,0.00048785945,0.00036847597,0.00076441,0.0007027552,0.0005688841,0.0017588658],"category_scores_gemma":[0.001137073,0.00034193567,0.00044249342,0.0005255806,0.00034993296,0.0007402531,0.00053376437,0.00080949976,0.0003685833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032055712,0.000016629474,0.00022090087,0.00002458139,0.000020716789,0.000017137289,0.000022425324,0.96932083,0.00067702506,0.0058267135,0.00066565967,0.023155399],"study_design_scores_gemma":[0.0000039639185,0.0000061550904,0.00002417545,0.0000010121945,0.0000011565094,0.0000014743589,0.0000017265727,0.9989504,0.000068587935,0.0007242806,0.00021597066,0.0000011117313],"about_ca_topic_score_codex":0.005298154,"about_ca_topic_score_gemma":0.0047196974,"teacher_disagreement_score":0.005298154,"about_ca_system_score_codex":0.0006859442,"about_ca_system_score_gemma":0.0011106262,"threshold_uncertainty_score":0.010534644},"labels":[],"label_agreement":null},{"id":"W4384303168","doi":"10.1007/978-3-031-36822-6_5","title":"Deep Learning Based Solution for Appliance Operational State Detection and Power Estimation in Non-intrusive Load Monitoring","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Benchmarking; Deep learning; State (computer science); Artificial intelligence; Power (physics); Power consumption; Architecture; Real-time computing; Machine learning; Data mining; Algorithm","score_opus":0.009046948901280718,"score_gpt":0.2191299090918681,"score_spread":0.2100829601905874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384303168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026679192,0.0006101627,0.9684664,0.00021857799,0.00008805674,0.00003157039,0.00013353673,0.0009909341,0.0027815802],"genre_scores_gemma":[0.75277156,0.00061556266,0.22911409,0.00024945807,0.0001418658,0.0001077555,0.0005753083,0.00009157737,0.016332744],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998542,0.000019363026,0.0000090975545,0.00004212464,0.000037464928,0.000037821406],"domain_scores_gemma":[0.9998172,0.0000730053,0.000017175418,0.00001898024,0.000061224986,0.000012416933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029236375,0.000605053,0.0005658913,0.00030702393,0.00022546963,0.00053708104,0.0008858547,0.00086522504,0.0024116323],"category_scores_gemma":[0.00055791996,0.00030628833,0.00047678896,0.00039518508,0.00019013375,0.00058978784,0.00068071,0.00087932043,0.00056118367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016981423,0.00024696635,0.0013918214,0.000110898865,0.00008178838,0.00012953105,0.00005528846,0.3508455,0.0145189045,0.0042979703,0.005041559,0.62311],"study_design_scores_gemma":[0.0000017331037,0.000014114288,0.0001525252,0.0000029013645,0.000004633397,0.000010694386,0.000003476972,0.99769163,0.0009954674,0.000846609,0.00027435587,0.0000017995613],"about_ca_topic_score_codex":0.005502199,"about_ca_topic_score_gemma":0.0089692315,"teacher_disagreement_score":0.005502199,"about_ca_system_score_codex":0.000392287,"about_ca_system_score_gemma":0.00063025457,"threshold_uncertainty_score":0.010940313},"labels":[],"label_agreement":null},{"id":"W4384695854","doi":"10.22215/etd/2023-15622","title":"Auction-Based Mechanisms for Power Grid Balancing using Cloud Datacenters","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Cloud computing; Computer science; Distributed computing; Grid; Flexibility (engineering); Renewable energy; Load balancing (electrical power); Efficient energy use; Energy consumption; Scheduling (production processes); Operating system; Engineering; Operations management; Economics; Electrical engineering","score_opus":0.014028701316792703,"score_gpt":0.24041757879710896,"score_spread":0.22638887748031625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384695854","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015737286,0.00061892316,0.968255,0.000498272,0.00018819886,0.00029421557,0.00007401486,0.00069586147,0.0136381835],"genre_scores_gemma":[0.8420493,0.00059246493,0.14879876,0.00019522481,0.00019116767,0.00039724162,0.00009247959,0.000116034236,0.007567382],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99740785,0.0010337336,0.00019333056,0.0003478263,0.0006997344,0.00031752582],"domain_scores_gemma":[0.99716395,0.0012123451,0.0003234282,0.0005977735,0.0004924289,0.00020997558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004202589,0.000757639,0.0011351034,0.0006868879,0.0010396477,0.0040957257,0.0025399136,0.0011967602,0.0066661555],"category_scores_gemma":[0.006655022,0.0005861829,0.00090258854,0.0012053583,0.0011517435,0.0036299007,0.0024724433,0.0018871175,0.00096868863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043562433,0.00020246688,0.00049879483,0.00021715583,0.00012467366,0.00023773669,0.00017759866,0.38270855,0.004800918,0.5431942,0.0064259036,0.060976494],"study_design_scores_gemma":[0.00016361846,0.00008257973,0.00012840185,0.00002645104,0.00003056963,0.00008305812,0.000035499826,0.86104864,0.001595841,0.12915452,0.0076193423,0.000031423162],"about_ca_topic_score_codex":0.0013654174,"about_ca_topic_score_gemma":0.0012950031,"teacher_disagreement_score":0.0066661555,"about_ca_system_score_codex":0.0017885793,"about_ca_system_score_gemma":0.0016432812,"threshold_uncertainty_score":0.022300482},"labels":[],"label_agreement":null},{"id":"W4384786903","doi":"10.1016/b978-0-443-15274-0.50085-8","title":"A sustainable energy supply system in smart cities: an integrated natural gas and electricity network operation","year":2023,"lang":"en","type":"book-chapter","venue":"Computer-aided chemical engineering/Computer aided chemical engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Electricity; Mathematical optimization; Linear programming; Integer programming; Energy storage; Natural gas; Computer science; Stochastic programming; Energy supply; Order (exchange); Environmental pollution; Energy (signal processing); Engineering; Environmental science; Waste management; Mathematics; Electrical engineering; Power (physics); Business","score_opus":0.004311981474474566,"score_gpt":0.15714083209549953,"score_spread":0.15282885062102497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384786903","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012580817,0.010939935,0.12614554,0.006475343,0.0016329442,0.00012163548,0.00023688517,0.00089090574,0.84097594],"genre_scores_gemma":[0.17026094,0.028548984,0.08888001,0.0014282486,0.0005633175,0.000118766664,0.00041617115,0.00043696797,0.7093466],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99991655,0.000012257045,0.0000024554006,0.000010841807,0.000049788865,0.000008039578],"domain_scores_gemma":[0.9999739,0.000006547048,0.0000019489764,0.000003067662,0.0000105539475,0.0000039194033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000120574085,0.00037070486,0.00016008235,0.00022751099,0.00034964536,0.0014085391,0.00038471856,0.0007066547,0.006057628],"category_scores_gemma":[0.00010634223,0.00021286908,0.00023359888,0.0007253924,0.00046148134,0.0016748935,0.00045457628,0.00068784395,0.0017346191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025233929,0.00007291729,0.0005590426,0.000218873,0.000015799455,0.00021992011,0.00026618087,0.042443294,0.004757778,0.52216214,0.15347247,0.27578643],"study_design_scores_gemma":[0.0000062415456,0.00003691839,0.00082826865,0.00012099039,0.000012326292,0.00022272795,0.00026653637,0.034177642,0.0022492537,0.14326663,0.8187972,0.000015196195],"about_ca_topic_score_codex":0.0046385555,"about_ca_topic_score_gemma":0.012842644,"teacher_disagreement_score":0.006057628,"about_ca_system_score_codex":0.0010007242,"about_ca_system_score_gemma":0.0017399928,"threshold_uncertainty_score":0.020264745},"labels":[],"label_agreement":null},{"id":"W4384788992","doi":"10.1016/b978-0-443-15274-0.50463-7","title":"Optimal operation of a sustainable water desalination unit integrated a green energy system","year":2023,"lang":"en","type":"book-chapter","venue":"Computer-aided chemical engineering/Computer aided chemical engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flexibility (engineering); Mathematical optimization; Desalination; Computer science; Integer programming; Energy (signal processing); Unit (ring theory); Linear programming; Algorithm; Mathematics","score_opus":0.007083266885152551,"score_gpt":0.16352864742415954,"score_spread":0.156445380539007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384788992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18363425,0.0012991584,0.65919614,0.00096162444,0.00030518856,0.0001393151,0.0002591803,0.00068499893,0.15352015],"genre_scores_gemma":[0.93201464,0.000548127,0.0422725,0.000061180384,0.000033329183,0.000054863503,0.0000719257,0.000052541433,0.024890935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998642,0.000027191501,0.000004590448,0.0000261834,0.000053940163,0.000023719447],"domain_scores_gemma":[0.99996793,0.000010790901,0.0000034859754,0.0000035247738,0.000010871625,0.0000034516968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012959918,0.00040495256,0.00040322237,0.00021050578,0.0003524719,0.00082264584,0.00041265687,0.00042604885,0.002504166],"category_scores_gemma":[0.00016735663,0.00027995303,0.00026407238,0.00029040631,0.0002980897,0.0006661133,0.00032966834,0.00035492596,0.00034360614],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021441805,0.00008682998,0.0006718362,0.00008242479,0.0000326904,0.00014867721,0.000050500235,0.827654,0.024419924,0.029577088,0.0043512774,0.11271023],"study_design_scores_gemma":[0.000012489048,0.00008115119,0.00051357684,0.000008370872,0.000014517701,0.000029891346,0.000046746405,0.9759268,0.0058052815,0.012691241,0.0048596454,0.000010304532],"about_ca_topic_score_codex":0.0044891494,"about_ca_topic_score_gemma":0.0099701,"teacher_disagreement_score":0.0044891494,"about_ca_system_score_codex":0.0008047233,"about_ca_system_score_gemma":0.0010603004,"threshold_uncertainty_score":0.008926034},"labels":[],"label_agreement":null},{"id":"W4385211414","doi":"10.1007/s12053-023-10135-3","title":"Human-centered determinants of price and incentive-based residential demand response in Ottawa, Canada","year":2023,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Incentive; Demand response; Sustainable development; Economics; Business; Natural resource economics; Engineering; Microeconomics; Political science","score_opus":0.008787419351152764,"score_gpt":0.22002247985989198,"score_spread":0.21123506050873922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385211414","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98225087,0.00039007436,0.00030209692,0.0023787182,0.000037774633,0.00007814801,0.0046729576,0.00003403475,0.009855272],"genre_scores_gemma":[0.9874548,0.00025757364,0.00027495215,0.00018765473,0.000007431847,0.000033607794,0.0012257503,0.00001863206,0.010539636],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99837023,0.00021804514,0.000092471695,0.00021307905,0.00034786537,0.00075833325],"domain_scores_gemma":[0.990932,0.0014395983,0.00075133727,0.00030175791,0.0042095226,0.0023658802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011807116,0.0003020459,0.00074466167,0.00094484445,0.005784414,0.003522163,0.0023168647,0.0008553214,0.008725392],"category_scores_gemma":[0.0048816283,0.0005478619,0.0009728571,0.002801545,0.0016268262,0.0007967774,0.0014232133,0.001757173,0.0007015965],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041673158,0.00033863095,0.956422,0.00008754592,0.00023707813,0.0003183986,0.0069437986,0.00348466,0.00050324935,0.005481926,0.0139982,0.011767802],"study_design_scores_gemma":[0.000032802618,0.000031841602,0.97721946,0.000079816826,0.00006418809,0.00003789862,0.012804919,0.0028546064,0.00018156742,0.00035923105,0.006257449,0.000076298056],"about_ca_topic_score_codex":0.99911314,"about_ca_topic_score_gemma":0.9997242,"teacher_disagreement_score":0.082806215,"about_ca_system_score_codex":0.082806215,"about_ca_system_score_gemma":0.09884133,"threshold_uncertainty_score":0.600804},"labels":[],"label_agreement":null},{"id":"W4385229680","doi":"10.53055/icimod.1025","title":"Handbook for on-grid rooftop solar PV design optimization","year":2023,"lang":"en","type":"book","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"European Commission; International Development Research Centre; World Bank Group","keywords":"Photovoltaic system; Grid-connected photovoltaic power system; Grid; Photovoltaic mounting system; Rooftop photovoltaic power station; Engineering; Architectural engineering; Electrical engineering; Systems engineering; Automotive engineering; Computer science; Inverter; Maximum power point tracking; Geography","score_opus":0.028429943493107325,"score_gpt":0.20413147555858355,"score_spread":0.17570153206547623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385229680","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001333919,0.0158614,0.3999908,0.0012263742,0.0016969127,0.00025026992,0.004373579,0.00544411,0.5698226],"genre_scores_gemma":[0.017547406,0.019639742,0.19197871,0.0010709581,0.00047180284,0.0006428737,0.0075198268,0.004898135,0.7562306],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993962,0.000052113788,0.000023326875,0.00006140464,0.00044274126,0.000024172747],"domain_scores_gemma":[0.99957615,0.000113074675,0.000018846356,0.000049648606,0.00022740428,0.0000149232455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037286922,0.0012589067,0.0010315104,0.0010373732,0.0005106228,0.0015980554,0.00115102,0.0010192576,0.100039534],"category_scores_gemma":[0.0009957392,0.0008183035,0.00085093133,0.0017610028,0.0002580598,0.001319352,0.0008850705,0.0017970471,0.05670214],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003920326,0.00008323576,0.00012892876,0.0010065618,0.000024133133,0.000089780544,0.0000854872,0.041746642,0.0042333887,0.027898723,0.45748484,0.467179],"study_design_scores_gemma":[0.000010801752,0.000029825502,0.00020026961,0.00023426262,0.000008772679,0.00015185677,0.000028752826,0.016560808,0.0014798972,0.01331968,0.967956,0.000018999528],"about_ca_topic_score_codex":0.0018029707,"about_ca_topic_score_gemma":0.004179796,"teacher_disagreement_score":0.100039534,"about_ca_system_score_codex":0.0007517238,"about_ca_system_score_gemma":0.0010528484,"threshold_uncertainty_score":0.3346656},"labels":[],"label_agreement":null},{"id":"W4385246239","doi":"10.1109/pcic42668.2022.10181295","title":"Integrating Renewable Energy Behind the Meter in Upstream Oil and Gas Operations - Part I","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algonquin College","funders":"","keywords":"Renewable energy; Greenhouse gas; Upstream (networking); Environmental economics; Fossil fuel; Electricity; Metre; Environmental science; Engineering; Electrical engineering; Economics; Telecommunications; Waste management","score_opus":0.008160416550073844,"score_gpt":0.18263003360659902,"score_spread":0.17446961705652517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385246239","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8361285,0.00073320646,0.057661876,0.0030333216,0.00018227469,0.00032721827,0.00018353075,0.00017870366,0.10157134],"genre_scores_gemma":[0.9788423,0.0003441644,0.011591558,0.0000690115,0.00002086022,0.000021106494,0.000048129845,0.000014131633,0.009048732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994779,0.00019011031,0.000019968671,0.00005141922,0.0001762687,0.000084349114],"domain_scores_gemma":[0.9997693,0.00009950065,0.000036971815,0.000026307756,0.000046838533,0.000021158725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004729721,0.0002564897,0.0001824221,0.00021185445,0.0005478841,0.0022194393,0.00042275625,0.00076241954,0.0039199106],"category_scores_gemma":[0.000663158,0.0002085259,0.00029064593,0.00041631985,0.00039974798,0.0015568377,0.0008397839,0.00060311414,0.00033915867],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077178725,0.0011259366,0.057146177,0.00092316506,0.0001162622,0.0054673757,0.0014749138,0.3445945,0.10462873,0.1820926,0.009558677,0.29209983],"study_design_scores_gemma":[0.0001442949,0.0024136968,0.07285962,0.0006173594,0.0002322949,0.0016613739,0.013344773,0.5229192,0.14843224,0.07592931,0.16120586,0.00023995942],"about_ca_topic_score_codex":0.005916336,"about_ca_topic_score_gemma":0.015441378,"teacher_disagreement_score":0.005916336,"about_ca_system_score_codex":0.0015366757,"about_ca_system_score_gemma":0.0014141654,"threshold_uncertainty_score":0.0131133795},"labels":[],"label_agreement":null},{"id":"W4385328825","doi":"10.5281/zenodo.8192914","title":"160 Hours of Labeled Power Consumption Dataset of Computer","year":2023,"lang":"en","type":"paratext","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Power consumption; Computer science; Consumption (sociology); Power (physics); Sociology","score_opus":0.03506974777963966,"score_gpt":0.243890285309327,"score_spread":0.20882053752968732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385328825","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008409056,0.0004394586,0.0028581407,0.00031704298,0.00023141294,0.000080987214,0.9704816,0.0114736315,0.005708769],"genre_scores_gemma":[0.006951793,0.00009233699,0.0014960626,0.00007984267,0.000026859605,0.000081934006,0.9892239,0.00033980838,0.0017074023],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907047,0.000114340095,0.00006450728,0.00035423494,0.00027692676,0.00011949302],"domain_scores_gemma":[0.9988856,0.0001468167,0.000063541476,0.00044816744,0.0003786064,0.0000772082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005262533,0.0023227392,0.0011943101,0.0015465602,0.00054975186,0.0011094089,0.0017635302,0.0013340889,0.02251175],"category_scores_gemma":[0.0022053753,0.00054251787,0.0010355938,0.0030284037,0.00032939628,0.0011597036,0.0008961781,0.0012111116,0.038296923],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032322743,0.00012768363,0.0028050556,0.00054136454,0.00009451415,0.00007615502,0.00003481308,0.0065529356,0.001135748,0.0004807496,0.9671271,0.020700585],"study_design_scores_gemma":[0.0003656054,0.00025081006,0.045645583,0.00026661696,0.000105975465,0.0003191362,0.00018673316,0.037898052,0.009533023,0.004463513,0.90081525,0.00014962563],"about_ca_topic_score_codex":0.0137719065,"about_ca_topic_score_gemma":0.0231683,"teacher_disagreement_score":0.02251175,"about_ca_system_score_codex":0.0008434115,"about_ca_system_score_gemma":0.00073383405,"threshold_uncertainty_score":0.075309336},"labels":[],"label_agreement":null},{"id":"W4385336207","doi":"10.1016/j.segan.2023.101113","title":"Flexibility: Literature review on concepts, modeling, and provision method in smart grid","year":2023,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Flexibility (engineering); Smart grid; Computer science; Risk analysis (engineering); Demand response; Distributed generation; Electric power system; Grid; Renewable energy; Systems engineering; Distributed computing; Engineering; Business; Power (physics); Electricity; Economics","score_opus":0.008103705424931357,"score_gpt":0.2564113881544691,"score_spread":0.24830768272953777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385336207","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041809874,0.91746426,0.052969575,0.0039850604,0.0008465034,0.00005447809,0.00028103462,0.00010920318,0.020108838],"genre_scores_gemma":[0.076511525,0.8959247,0.022384556,0.0010056482,0.0014334196,0.00008115762,0.0003566623,0.00005281339,0.0022495782],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896526,0.00028420112,0.00013963765,0.00020264504,0.0003496737,0.00005851849],"domain_scores_gemma":[0.99574226,0.0033624778,0.00025903064,0.00017785063,0.00040761736,0.00005075166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001715035,0.0008397555,0.0009454691,0.00349606,0.00049371086,0.0029473733,0.0015320466,0.0012070915,0.003572856],"category_scores_gemma":[0.0050189253,0.00038092642,0.0008426596,0.008975473,0.001145462,0.0054263975,0.0010501082,0.0011166066,0.0005411513],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009072261,0.00009900826,0.0016751026,0.021862755,0.00012952962,0.00024002482,0.000639927,0.01275599,0.000870754,0.23497634,0.017743478,0.7089163],"study_design_scores_gemma":[0.000028432114,0.00012927731,0.0032722666,0.022999005,0.00047269664,0.0013274285,0.0017875106,0.023380665,0.002298041,0.21669053,0.7274764,0.00013761237],"about_ca_topic_score_codex":0.0030003693,"about_ca_topic_score_gemma":0.0024053873,"teacher_disagreement_score":0.003572856,"about_ca_system_score_codex":0.0012012527,"about_ca_system_score_gemma":0.0024675278,"threshold_uncertainty_score":0.0119524},"labels":[],"label_agreement":null},{"id":"W4385454382","doi":"10.32920/23811216","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Energy storage; Computer science; Smart grid; Environmental science; Business; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.01602422682923109,"score_gpt":0.19550603314723525,"score_spread":0.17948180631800414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385454382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69657576,0.00014660115,0.28466037,0.0002696886,0.00005016294,0.0001615052,0.000088707115,0.000840328,0.017206937],"genre_scores_gemma":[0.9932064,0.000021777183,0.0047498858,0.0000118394055,0.0000033261242,0.000024905263,0.000013738418,0.0000053795698,0.0019627],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997383,0.00008727308,0.000011398865,0.00006313295,0.00006549399,0.0000343263],"domain_scores_gemma":[0.9996557,0.000108538894,0.00005031783,0.00003483098,0.00010509122,0.00004550226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037034476,0.00036575404,0.0003695553,0.0001819704,0.0006425517,0.0008274498,0.0008448324,0.00033963998,0.0017952687],"category_scores_gemma":[0.0005354142,0.00022041104,0.0002802441,0.00020445308,0.00040396187,0.00052040786,0.0008898468,0.00039589492,0.00019739439],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004385094,0.00036076512,0.0023083668,0.00007367673,0.00006246485,0.00044616338,0.00025845226,0.93101853,0.024114737,0.0028824583,0.0006825092,0.037353322],"study_design_scores_gemma":[0.000020795223,0.00009630361,0.0003147125,0.0000018247297,0.000010376735,0.000026514072,0.000043284545,0.99678206,0.0018681455,0.0004195664,0.0004114222,0.000004966425],"about_ca_topic_score_codex":0.013993016,"about_ca_topic_score_gemma":0.017605405,"teacher_disagreement_score":0.013993016,"about_ca_system_score_codex":0.0005655942,"about_ca_system_score_gemma":0.0005904568,"threshold_uncertainty_score":0.02782315},"labels":[],"label_agreement":null},{"id":"W4385462724","doi":"10.32920/23811216.v1","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Energy storage; Computer science; Smart grid; Environmental science; Business; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.01602422682923109,"score_gpt":0.19550603314723525,"score_spread":0.17948180631800414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385462724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69657576,0.00014660115,0.28466037,0.0002696886,0.00005016294,0.0001615052,0.000088707115,0.000840328,0.017206937],"genre_scores_gemma":[0.9932064,0.000021777183,0.0047498858,0.0000118394055,0.0000033261242,0.000024905263,0.000013738418,0.0000053795698,0.0019627],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997383,0.00008727308,0.000011398865,0.00006313295,0.00006549399,0.0000343263],"domain_scores_gemma":[0.9996557,0.000108538894,0.00005031783,0.00003483098,0.00010509122,0.00004550226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037034476,0.00036575404,0.0003695553,0.0001819704,0.0006425517,0.0008274498,0.0008448324,0.00033963998,0.0017952687],"category_scores_gemma":[0.0005354142,0.00022041104,0.0002802441,0.00020445308,0.00040396187,0.00052040786,0.0008898468,0.00039589492,0.00019739439],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004385094,0.00036076512,0.0023083668,0.00007367673,0.00006246485,0.00044616338,0.00025845226,0.93101853,0.024114737,0.0028824583,0.0006825092,0.037353322],"study_design_scores_gemma":[0.000020795223,0.00009630361,0.0003147125,0.0000018247297,0.000010376735,0.000026514072,0.000043284545,0.99678206,0.0018681455,0.0004195664,0.0004114222,0.000004966425],"about_ca_topic_score_codex":0.013993016,"about_ca_topic_score_gemma":0.017605405,"teacher_disagreement_score":0.013993016,"about_ca_system_score_codex":0.0005655942,"about_ca_system_score_gemma":0.0005904568,"threshold_uncertainty_score":0.02782315},"labels":[],"label_agreement":null},{"id":"W4385466350","doi":"10.1007/978-3-031-35233-1_6","title":"The Blockchain-Based Competitive Market for Peer-to-Peer Energy Token Trading Using Demurrage Mechanism","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Blockchain; Peer-to-peer; Security token; Business; Energy market; Industrial organization; Computer science; Commerce; Computer security; Distributed computing; Renewable energy; Engineering; Electrical engineering","score_opus":0.013818422818426504,"score_gpt":0.19879195108862574,"score_spread":0.18497352827019925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466350","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044002615,0.0028814361,0.7404105,0.003147728,0.0010982708,0.0005459035,0.0006795661,0.001216416,0.20601761],"genre_scores_gemma":[0.7928702,0.002027357,0.08893558,0.00034851732,0.000258984,0.00036193716,0.00046967284,0.0002321017,0.11449565],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906045,0.0002489661,0.000036746504,0.0001437854,0.00035101216,0.00015905638],"domain_scores_gemma":[0.999084,0.0004240558,0.000052859064,0.00019543192,0.00016398674,0.00007962998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010565973,0.0004204882,0.0008777827,0.00058860483,0.0014219838,0.0026051186,0.0019420183,0.0018159766,0.019068662],"category_scores_gemma":[0.002574523,0.00033885197,0.00057418854,0.0014287322,0.0014209902,0.0054340283,0.0018522119,0.0017620937,0.0029009238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032109913,0.0001232291,0.00019191412,0.00023352748,0.00003482871,0.000264329,0.00014416329,0.04444914,0.0049086716,0.85063744,0.015824633,0.08286705],"study_design_scores_gemma":[0.00008351227,0.00013009603,0.00015985871,0.00004796017,0.000020079027,0.0003012051,0.00007168734,0.38376504,0.0039662635,0.56841314,0.042989492,0.000051664345],"about_ca_topic_score_codex":0.001946694,"about_ca_topic_score_gemma":0.002214977,"teacher_disagreement_score":0.019068662,"about_ca_system_score_codex":0.0014832309,"about_ca_system_score_gemma":0.001991282,"threshold_uncertainty_score":0.06379104},"labels":[],"label_agreement":null},{"id":"W4385466425","doi":"10.1007/978-3-031-35233-1_8","title":"Robust Optimization-Based Decentralized Peer-to-Peer Energy Trading for Prosumers","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Peer-to-peer; Economic shortage; Upstream (networking); Business; Microgrid; Energy market; Environmental economics; Computer science; Distributed computing; Economics; Engineering; Renewable energy; Computer network; Control (management); Artificial intelligence","score_opus":0.018863236118735204,"score_gpt":0.19337089375882097,"score_spread":0.17450765764008577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466425","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020764282,0.00091953564,0.9628031,0.00029714935,0.00014693275,0.00006090144,0.000053891352,0.0005892076,0.014364876],"genre_scores_gemma":[0.92705476,0.0004017739,0.06225019,0.000111234236,0.0000950481,0.00009405945,0.0000665058,0.00012813244,0.009798187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957365,0.00012277364,0.00001698344,0.00010516339,0.00012303433,0.000058296537],"domain_scores_gemma":[0.99960166,0.0002477059,0.000030603165,0.0000382168,0.00006595517,0.000015863741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063463516,0.00097654294,0.0016920979,0.00020587645,0.0005167713,0.0011700422,0.001627701,0.0011045813,0.004330782],"category_scores_gemma":[0.0014397606,0.0005862237,0.000514438,0.00042339065,0.0006628822,0.0011547672,0.0010876484,0.0012796054,0.0006852689],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011920318,0.00006260085,0.0000659204,0.000075088,0.000039064333,0.00007190219,0.000028779821,0.9387345,0.0031482787,0.011422875,0.0020285877,0.044203263],"study_design_scores_gemma":[0.0000054077173,0.000020616022,0.000022659207,0.0000020870727,0.0000035220817,0.00001372319,0.0000040069403,0.9947023,0.00035296174,0.004621182,0.00024826714,0.0000032716455],"about_ca_topic_score_codex":0.0018991043,"about_ca_topic_score_gemma":0.0023364737,"teacher_disagreement_score":0.004330782,"about_ca_system_score_codex":0.00057919504,"about_ca_system_score_gemma":0.00056364795,"threshold_uncertainty_score":0.014487922},"labels":[],"label_agreement":null},{"id":"W4385466581","doi":"10.1007/978-3-031-35233-1_5","title":"Fully Decentralized and Competitive Hybrid Retail and Local Electricity Market Using Peer-to-Peer Energy Trading","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Clearance; Peer-to-peer; Business; Smart grid; Electricity; Industrial organization; Electricity market; Profit (economics); Prosumer; Dual (grammatical number); Energy market; Upstream (networking); Commerce; Microeconomics; Renewable energy; Economics; Computer science; Telecommunications; Engineering; Distributed computing","score_opus":0.011817942215350583,"score_gpt":0.1884782016812372,"score_spread":0.1766602594658866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466581","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15285158,0.0008907765,0.71946746,0.0007590984,0.00032078938,0.00018424018,0.00026716237,0.001331598,0.12392727],"genre_scores_gemma":[0.9445605,0.00023079831,0.030909533,0.00008463069,0.00008633832,0.00006322396,0.00009100778,0.00010729761,0.02386654],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995709,0.00011293485,0.000012099865,0.0000962116,0.0001348505,0.00007294515],"domain_scores_gemma":[0.99966,0.00016190033,0.000018850345,0.00007146768,0.000058745674,0.00002908388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043746555,0.00038523087,0.0009331164,0.00017232262,0.0005465536,0.0016945718,0.0015820798,0.0010471691,0.009669504],"category_scores_gemma":[0.0009830508,0.000380484,0.00047851022,0.0004445939,0.0008016771,0.0027252394,0.0012223625,0.0008669495,0.0014059345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069459446,0.00037554916,0.00057520455,0.00020766989,0.00011404576,0.0007172743,0.00014369695,0.6094246,0.014522732,0.24365963,0.016141312,0.11342368],"study_design_scores_gemma":[0.000035002162,0.00006128939,0.00013484932,0.0000039288793,0.000009765174,0.000115001814,0.000026484946,0.9483739,0.00092712505,0.0476041,0.0026960904,0.000012423559],"about_ca_topic_score_codex":0.0012001495,"about_ca_topic_score_gemma":0.001712322,"teacher_disagreement_score":0.009669504,"about_ca_system_score_codex":0.0006091325,"about_ca_system_score_gemma":0.00074293005,"threshold_uncertainty_score":0.03234774},"labels":[],"label_agreement":null},{"id":"W4385477867","doi":"10.1109/cai54212.2023.00046","title":"Home Energy Management with V2X Capability using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Electricity; Computer science; Energy management; Control (management); Electricity generation; Home automation; Energy management system; Load management; Electric power system; Energy (signal processing); Power (physics); Engineering; Artificial intelligence; Telecommunications; Electrical engineering","score_opus":0.010275081732194082,"score_gpt":0.190971900949268,"score_spread":0.18069681921707392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385477867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.101220824,0.0003342392,0.8810865,0.00032482596,0.0000767332,0.00012371298,0.00004607192,0.0025273033,0.014259831],"genre_scores_gemma":[0.9839897,0.000039317354,0.014578568,0.00003456019,0.0000096266085,0.000036080528,0.000016670385,0.000019284615,0.0012761167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985385,0.00004313214,0.00000846098,0.000032267377,0.00003937569,0.00002289217],"domain_scores_gemma":[0.99973136,0.00012186102,0.000040034098,0.000029448353,0.000056219167,0.000021049602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004435289,0.0003997331,0.00038424812,0.00017393046,0.00024470154,0.00049326237,0.0005677403,0.00031261583,0.0018937988],"category_scores_gemma":[0.0007904393,0.00014883906,0.00018794986,0.00013421048,0.0003028622,0.00041303545,0.0006356457,0.00050874706,0.0002957997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019345598,0.00016413636,0.0009777882,0.0000622948,0.00004797056,0.00011888417,0.00006818524,0.89439297,0.008457122,0.004318137,0.0014332164,0.08976586],"study_design_scores_gemma":[0.000019750865,0.000046688434,0.000110096575,0.0000031051513,0.0000035428343,0.000013264177,0.0000037007192,0.9972319,0.00092199526,0.0012108274,0.00043199968,0.000003049917],"about_ca_topic_score_codex":0.004923515,"about_ca_topic_score_gemma":0.0038903484,"teacher_disagreement_score":0.004923515,"about_ca_system_score_codex":0.00031879547,"about_ca_system_score_gemma":0.00039400315,"threshold_uncertainty_score":0.009789705},"labels":[],"label_agreement":null},{"id":"W4385520967","doi":"10.20944/preprints202308.0281.v1","title":"Towards Feasible Solutions for Load Monitoring in Quebec Residences","year":2023,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Exploit; Implementation; Identification (biology); Context (archaeology); Computer science; Risk analysis (engineering); Work (physics); Data science; Smart meter; Operations research; Management science; Engineering; Computer security; Smart grid; Software engineering; Business","score_opus":0.21542096625688445,"score_gpt":0.34961079630635256,"score_spread":0.1341898300494681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385520967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29442897,0.0028842574,0.5785984,0.033693295,0.00027570743,0.0016580202,0.008299585,0.0043477286,0.075814016],"genre_scores_gemma":[0.72764623,0.0010707227,0.24249484,0.0011865159,0.00007022366,0.00042754065,0.004733042,0.00017378849,0.022196986],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808586,0.000540876,0.00008004516,0.0005167855,0.0003657547,0.00041066238],"domain_scores_gemma":[0.9970578,0.00080529787,0.00025783395,0.00041588783,0.0011790441,0.00028420816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023192589,0.0007650636,0.0005844733,0.0018500612,0.0023321263,0.0051346053,0.002911979,0.0017436916,0.007749033],"category_scores_gemma":[0.0056816437,0.0003881573,0.00075032434,0.0030867192,0.0011909027,0.0025658852,0.0028444456,0.0010035812,0.000782763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042818856,0.00040885087,0.057864364,0.0008253432,0.00022743353,0.0020899666,0.002882784,0.20660873,0.009312389,0.22808649,0.04839528,0.4428702],"study_design_scores_gemma":[0.00014985791,0.00015668367,0.049879234,0.00059185876,0.000140717,0.00043845613,0.011383755,0.68617755,0.004332366,0.074996755,0.17154488,0.00020780429],"about_ca_topic_score_codex":0.80235994,"about_ca_topic_score_gemma":0.85681283,"teacher_disagreement_score":0.19764006,"about_ca_system_score_codex":0.017734772,"about_ca_system_score_gemma":0.018145043,"threshold_uncertainty_score":0.39760798},"labels":[],"label_agreement":null},{"id":"W4385552411","doi":"10.21926/jept.2303026","title":"Volt-Var Control for Utility-Scale Solar PV Plants to Downsize SVCs and Curtailment Effects","year":2023,"lang":"en","type":"article","venue":"Journal of Energy and Power Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Morgan Solar (Canada)","funders":"","keywords":"Photovoltaic system; Overvoltage; AC power; Voltage; Compensation (psychology); Voltage regulation; Grid; Voltage optimisation; Photovoltaics; Volt; Electrical engineering; Automotive engineering; Control theory (sociology); Computer science; Engineering; Control (management); Mathematics","score_opus":0.0036569496760615137,"score_gpt":0.19664799095630703,"score_spread":0.19299104128024552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385552411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5359175,0.0005380029,0.42902488,0.00046339532,0.00018090369,0.00014900314,0.00016578128,0.001239905,0.032320637],"genre_scores_gemma":[0.99754673,0.000028818273,0.0017975122,0.00001618976,0.000004263838,0.00000787027,0.000010180594,0.0000056762187,0.0005828129],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999045,0.000028377779,0.0000062445642,0.000018587401,0.000027751514,0.000014508472],"domain_scores_gemma":[0.9998876,0.00004458198,0.000028477145,0.000009468571,0.000024375198,0.000005599216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022786768,0.0003604397,0.00017885819,0.00021531187,0.0002127372,0.00039524556,0.0003675668,0.00026978814,0.0020916178],"category_scores_gemma":[0.00041241385,0.00010803802,0.00018606869,0.00014837115,0.00022949731,0.00022232668,0.00018089902,0.00040092017,0.00014448288],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043741247,0.0002751847,0.0020041536,0.00018868019,0.000072136696,0.00028455944,0.00010640036,0.8765781,0.054816384,0.0066904933,0.0018132726,0.056733143],"study_design_scores_gemma":[0.000043863438,0.00026244274,0.0016290313,0.0000088699535,0.000026811696,0.000037763668,0.00002367966,0.9898024,0.0051491936,0.001517688,0.0014906664,0.000007514397],"about_ca_topic_score_codex":0.003613923,"about_ca_topic_score_gemma":0.0055500194,"teacher_disagreement_score":0.003613923,"about_ca_system_score_codex":0.0002894375,"about_ca_system_score_gemma":0.00015449444,"threshold_uncertainty_score":0.007185757},"labels":[],"label_agreement":null},{"id":"W4385579171","doi":"10.1007/978-3-030-97940-9_65","title":"Machine Learning to Facilitate the Integration of Renewable Energies into the Grid","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Renewable energy; Grid; Production (economics); Electricity; Environmental economics; Environmental science; Computer science; Process engineering; Industrial engineering; Engineering; Meteorology; Electrical engineering; Economics; Geography; Microeconomics","score_opus":0.03148595388371271,"score_gpt":0.20446315609419097,"score_spread":0.17297720221047824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385579171","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025977525,0.050151814,0.4024051,0.0062856474,0.0031936378,0.0000880655,0.00055547804,0.0024265961,0.5322959],"genre_scores_gemma":[0.051776048,0.052893635,0.1788696,0.0018502744,0.0017753522,0.00013893968,0.001118981,0.0008521682,0.710725],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998419,0.000024137054,0.00000505482,0.0000223061,0.00009661896,0.00000993509],"domain_scores_gemma":[0.999835,0.000098147204,0.00000772797,0.000024615902,0.000028747827,0.0000056672325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023256129,0.00056114787,0.00035135838,0.0005100848,0.00026058016,0.0016613156,0.00072626566,0.0007566671,0.02000973],"category_scores_gemma":[0.00054263603,0.00026661993,0.00034814543,0.0012226088,0.00041525482,0.002005826,0.0006238995,0.0019484032,0.008378198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018784578,0.0000622488,0.00010880233,0.00036532202,0.00002487276,0.0000676549,0.00008585748,0.01862699,0.0029058368,0.266887,0.15771252,0.55313414],"study_design_scores_gemma":[0.0000058612486,0.000019506124,0.0002774153,0.00024785261,0.000009718343,0.00017014479,0.000032484717,0.05035764,0.0031972858,0.16264454,0.78302115,0.000016424503],"about_ca_topic_score_codex":0.0009847474,"about_ca_topic_score_gemma":0.0018389069,"teacher_disagreement_score":0.02000973,"about_ca_system_score_codex":0.00059760414,"about_ca_system_score_gemma":0.00039787975,"threshold_uncertainty_score":0.066939175},"labels":[],"label_agreement":null},{"id":"W4385587924","doi":"10.1007/978-3-030-97940-9_11","title":"A PDE-Based Aggregate Power Tracking Control of Heterogeneous TCL Populations","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Thermostat; Control theory (sociology); Aggregate (composite); Stability (learning theory); Tracking (education); Domain (mathematical analysis); Nonlinear system; Linearization; Partial differential equation; Mathematics; Power (physics); Scheme (mathematics); Control (management); Computer science; Engineering; Mathematical analysis; Physics","score_opus":0.027254481687782037,"score_gpt":0.2139682048349396,"score_spread":0.18671372314715756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385587924","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071290378,0.000346908,0.9715726,0.00033132843,0.00023282372,0.00003932912,0.00007109559,0.00025044556,0.020026444],"genre_scores_gemma":[0.8367205,0.0009129534,0.110740006,0.0004149919,0.00025855098,0.00019678172,0.00020728231,0.00022153521,0.050327394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982685,0.00003507841,0.0000077007235,0.00004447146,0.00006279004,0.00002301229],"domain_scores_gemma":[0.9997292,0.00012316453,0.000022124217,0.00003247329,0.00007160764,0.000021398664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004621104,0.00043737717,0.00079087145,0.00028935308,0.00048015369,0.0016398209,0.0012065829,0.0008366187,0.004471514],"category_scores_gemma":[0.0012378248,0.00028659194,0.0005568776,0.00047324382,0.0006687881,0.0010324656,0.0014208786,0.0012394341,0.0006225585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044317545,0.000043345048,0.00024158045,0.000067701585,0.000030009984,0.000062275714,0.000108715016,0.8722488,0.0042613344,0.060002908,0.005512513,0.05737643],"study_design_scores_gemma":[0.0000019342672,0.0000073914275,0.000025643712,0.000002479736,0.0000019977294,0.0000055537757,0.0000041169,0.9950643,0.00015684517,0.004039393,0.00068823807,0.0000021085987],"about_ca_topic_score_codex":0.0064140633,"about_ca_topic_score_gemma":0.004833833,"teacher_disagreement_score":0.0064140633,"about_ca_system_score_codex":0.00088546233,"about_ca_system_score_gemma":0.00066122337,"threshold_uncertainty_score":0.01495868},"labels":[],"label_agreement":null},{"id":"W4385625765","doi":"10.1109/icaeca56562.2023.10200287","title":"A Futuristic Review on Sustainable Energy Grid","year":2023,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Grid; Intermittent energy source; Distributed computing; Distributed generation; Load balancing (electrical power); Energy consumption; Energy management; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.031242318251739534,"score_gpt":0.2752486921949374,"score_spread":0.24400637394319788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385625765","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00023431206,0.9810198,0.00072635384,0.0016106643,0.0020503602,0.000018509685,0.000107134074,0.00003097372,0.014202004],"genre_scores_gemma":[0.0014161696,0.99232507,0.00064108515,0.0007513258,0.00076965295,0.000013676156,0.00013829207,0.000009709637,0.003934975],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996897,0.00004547483,0.00003573529,0.000048571223,0.00014645602,0.000034053326],"domain_scores_gemma":[0.999503,0.0002054711,0.000048420272,0.000025213421,0.00017397193,0.000043976004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000589656,0.0009872712,0.0011671293,0.002568508,0.00045100655,0.0016232568,0.00086045865,0.0013420149,0.017182771],"category_scores_gemma":[0.0009044067,0.00031612965,0.00067275635,0.004346109,0.00045491286,0.002632489,0.001057426,0.0016552836,0.0067207827],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037893264,0.00007253099,0.00017273906,0.016283182,0.000057211775,0.00026217842,0.00011380611,0.0005970855,0.0013221365,0.03487396,0.13327558,0.8129318],"study_design_scores_gemma":[0.0000014156595,0.000015105035,0.0001176786,0.0014607147,0.00001496465,0.0001577884,0.000032909313,0.00003759301,0.00009478466,0.0024579738,0.99560344,0.000005579246],"about_ca_topic_score_codex":0.0010808397,"about_ca_topic_score_gemma":0.0020282634,"teacher_disagreement_score":0.017182771,"about_ca_system_score_codex":0.0006937023,"about_ca_system_score_gemma":0.0018113479,"threshold_uncertainty_score":0.057482064},"labels":[],"label_agreement":null},{"id":"W4385626999","doi":"10.1109/access.2023.3303204","title":"Efficient Energy Management for Household: Optimization-Based Integration of Distributed Energy Resources in Smart Grid","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"King Saud University","keywords":"Smart grid; Renewable energy; Environmental economics; Computer science; Knapsack problem; Grid; Population; Variable renewable energy; Energy management; Energy storage; Energy (signal processing); Economics; Engineering; Algorithm; Mathematics; Electrical engineering","score_opus":0.020191268301705173,"score_gpt":0.23545748303338535,"score_spread":0.21526621473168017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385626999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032230932,0.0002868558,0.9605024,0.00018233353,0.000037125705,0.000057504654,0.000047682624,0.0003818168,0.006273346],"genre_scores_gemma":[0.88971615,0.00023252443,0.10673152,0.00007582007,0.000025261417,0.000087033404,0.00008167249,0.00005736002,0.0029925415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984276,0.00004814328,0.000008025747,0.00003525874,0.000042766384,0.00002302383],"domain_scores_gemma":[0.99991965,0.000029513563,0.000016367536,0.000008000214,0.000019056699,0.0000074203144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026687502,0.00046969007,0.00066017814,0.00024379078,0.00027199145,0.0005617386,0.0004726111,0.00033764626,0.0015447696],"category_scores_gemma":[0.0004305296,0.00024485137,0.00031201198,0.000379974,0.00022528248,0.0007009045,0.00047318652,0.00038993734,0.00017908806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022370037,0.000020422634,0.0002544183,0.000020491834,0.000014850712,0.000018899793,0.000016782978,0.97498715,0.0010539624,0.0018243552,0.00039623436,0.021370057],"study_design_scores_gemma":[0.000001999669,0.000007518957,0.00005923143,0.0000014607627,0.0000025101426,0.0000031975958,0.00000568872,0.9988079,0.00019673439,0.00063881365,0.0002734715,0.0000015176555],"about_ca_topic_score_codex":0.006166595,"about_ca_topic_score_gemma":0.008036779,"teacher_disagreement_score":0.006166595,"about_ca_system_score_codex":0.000555097,"about_ca_system_score_gemma":0.00060498784,"threshold_uncertainty_score":0.01226145},"labels":[],"label_agreement":null},{"id":"W4385627093","doi":"10.1109/tsg.2023.3302520","title":"Novel Incentive-Based Multi-Level Framework for Flexibility Provision in Smart Grids","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"News aggregator; Smart grid; Flexibility (engineering); Incentive; Computer science; Schedule; Grid; Electricity; Demand response; Electric power system; Reliability engineering; Prosumer; Risk analysis (engineering); Environmental economics; Engineering; Power (physics); Business; Renewable energy; Economics; Microeconomics; Electrical engineering","score_opus":0.07637732876544913,"score_gpt":0.2941756082613052,"score_spread":0.21779827949585606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385627093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062437137,0.00016018462,0.9891728,0.00025728095,0.000042265314,0.00006769486,0.000036892598,0.00015377812,0.0038653617],"genre_scores_gemma":[0.72355646,0.0003024918,0.27128273,0.00012421972,0.00008824548,0.00020426359,0.000072562376,0.00005415549,0.004314872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890447,0.0004445423,0.0000539398,0.00018103766,0.00025891003,0.00015716153],"domain_scores_gemma":[0.9995173,0.00019935142,0.00006764013,0.000048438327,0.0000872186,0.00007997449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019006405,0.0006420045,0.0007663662,0.00048886123,0.00067871745,0.0018076254,0.0017479738,0.001237757,0.0042925244],"category_scores_gemma":[0.0016109569,0.0003827932,0.0009680539,0.0006631103,0.00086361193,0.0022083318,0.0016330448,0.0014425355,0.00033266007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008443602,0.0001260733,0.00053965533,0.000110723166,0.000055830038,0.000273586,0.00016849584,0.6812551,0.0030133016,0.27277586,0.0017195304,0.03987749],"study_design_scores_gemma":[0.000015318627,0.0000336084,0.000052479885,0.000008033191,0.000010300723,0.000026810725,0.000014872888,0.9757151,0.00029727485,0.022188857,0.0016279513,0.00000936542],"about_ca_topic_score_codex":0.0028674095,"about_ca_topic_score_gemma":0.0040421067,"teacher_disagreement_score":0.0042925244,"about_ca_system_score_codex":0.0012989313,"about_ca_system_score_gemma":0.0020151888,"threshold_uncertainty_score":0.014359891},"labels":[],"label_agreement":null},{"id":"W4385682033","doi":"10.48550/arxiv.2308.03591","title":"On Data-Driven Modeling and Control in Modern Power Grids Stability: Survey and Perspective","year":2023,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed generation; Renewable energy; Computer science; Grid; Wind power; Control (management); Photovoltaic system; Smart grid; Control engineering; Engineering; Electrical engineering","score_opus":0.12063734411857378,"score_gpt":0.19793814022759304,"score_spread":0.07730079610901926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385682033","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031125539,0.71692085,0.25794128,0.0037270354,0.0010453069,0.000039792554,0.00016633557,0.00018876874,0.016858103],"genre_scores_gemma":[0.0628125,0.8931255,0.03548402,0.0010571897,0.0032983553,0.00007348007,0.00036241894,0.00006031074,0.0037262884],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99944764,0.0001381067,0.000051896557,0.000111500456,0.00022201939,0.00002882958],"domain_scores_gemma":[0.99869907,0.0008982891,0.000053946147,0.00008064004,0.00023961974,0.000028372153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012405041,0.0009809858,0.0012992221,0.0016424998,0.00037751519,0.001831995,0.0009608283,0.001277744,0.0020318301],"category_scores_gemma":[0.0015791149,0.00044479847,0.0006282284,0.0033087207,0.0010484518,0.0027863467,0.0009818181,0.0016746242,0.0008240517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007299732,0.0001694489,0.0014204733,0.006580146,0.00017195803,0.00026998876,0.00035629325,0.07575022,0.0015363359,0.30166417,0.022237638,0.58977026],"study_design_scores_gemma":[0.000021678987,0.00023338223,0.0013606388,0.0033710098,0.00013573539,0.00068283133,0.00035806306,0.160798,0.0016252149,0.32979846,0.5014788,0.00013623442],"about_ca_topic_score_codex":0.0016185751,"about_ca_topic_score_gemma":0.00083096663,"teacher_disagreement_score":0.0020318301,"about_ca_system_score_codex":0.00074312976,"about_ca_system_score_gemma":0.00087696797,"threshold_uncertainty_score":0.006797135},"labels":[],"label_agreement":null},{"id":"W4385693880","doi":"10.1155/2023/9828275","title":"Retracted: The Network Global Optimal Mapping Approach Utilizing a Discrete Firefly Optimization Algorithm","year":2023,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Firefly algorithm; Firefly protocol; Computer science; Optimization algorithm; Algorithm; Mathematical optimization; Mathematics; Biology","score_opus":0.010710834546479725,"score_gpt":0.22308485777229048,"score_spread":0.21237402322581075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385693880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009816583,0.00012234197,0.98403037,0.0002584571,0.00022719313,0.000056562552,0.000050019684,0.00050860445,0.004929883],"genre_scores_gemma":[0.31193662,0.00016738582,0.6721085,0.00031601446,0.0001468913,0.0001824417,0.0002474713,0.0003901041,0.01450456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997036,0.00009363218,0.000011250256,0.000057975267,0.000092611794,0.000040941675],"domain_scores_gemma":[0.9995216,0.00018843143,0.00002987469,0.00007875356,0.00014088053,0.000040430634],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.001042038,0.0008373329,0.00093778403,0.00059334555,0.0005525466,0.0009862009,0.0019865278,0.0014868284,0.007457138],"category_scores_gemma":[0.0026752877,0.00042651352,0.0007303098,0.0005288631,0.0005617177,0.0014592918,0.0015837121,0.0012684145,0.0009164224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013780536,0.00008102921,0.00041533567,0.00006632397,0.00003852837,0.00009755364,0.00008108595,0.8658004,0.001775935,0.011720406,0.0047505638,0.115035236],"study_design_scores_gemma":[0.000008916299,0.000015433454,0.000029195327,0.0000035267792,0.0000035928488,0.000010707909,0.0000072650737,0.99764603,0.00025161047,0.001355311,0.00066594424,0.0000024538374],"about_ca_topic_score_codex":0.008688864,"about_ca_topic_score_gemma":0.007383383,"teacher_disagreement_score":0.99851316,"about_ca_system_score_codex":0.0006660222,"about_ca_system_score_gemma":0.0016933333,"threshold_uncertainty_score":0.02494663},"labels":[],"label_agreement":null},{"id":"W4385753491","doi":"10.1109/redec58286.2023.10208165","title":"Power Routing Algorithms: A Comparative Study","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"National Council for Scientific Research; Agence Universitaire de la Francophonie","keywords":"Computer science; Tree traversal; Algorithm; Smart grid; Shortest path problem; Distributed computing; Graph; Engineering; Theoretical computer science","score_opus":0.029494884889993495,"score_gpt":0.2668873956034211,"score_spread":0.23739251071342762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385753491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122385345,0.048988655,0.7341365,0.0023382104,0.00079989893,0.0003916725,0.00032999422,0.0011691252,0.08946052],"genre_scores_gemma":[0.7008344,0.031142058,0.25880736,0.00036150092,0.0004887773,0.00019603582,0.00060234725,0.0003182076,0.007249309],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997875,0.000894877,0.00014044416,0.0002639717,0.0007018968,0.00012381973],"domain_scores_gemma":[0.98990077,0.0078101107,0.00035515314,0.00047805623,0.0013559168,0.00010002977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031197963,0.0010150331,0.0010371296,0.0029140632,0.0006574838,0.0019945,0.0011421067,0.001305787,0.0032977264],"category_scores_gemma":[0.010850459,0.000288982,0.0007712572,0.004391098,0.0005498383,0.0034801667,0.00053190725,0.0007703739,0.0005505311],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020572223,0.00025159086,0.0020132556,0.00047552297,0.00014204328,0.000058270594,0.00007761929,0.58223504,0.0005639602,0.029068774,0.004134578,0.38077363],"study_design_scores_gemma":[0.000042760137,0.0002580247,0.0010984781,0.0000918943,0.00007193762,0.0002341129,0.00012663213,0.9749884,0.0007266489,0.013155747,0.009187595,0.000017707574],"about_ca_topic_score_codex":0.0028026563,"about_ca_topic_score_gemma":0.0019278252,"teacher_disagreement_score":0.0032977264,"about_ca_system_score_codex":0.0014691366,"about_ca_system_score_gemma":0.0009084677,"threshold_uncertainty_score":0.01649928},"labels":[],"label_agreement":null},{"id":"W4385973020","doi":"10.1016/j.ref.2023.08.002","title":"Impact of residential photovoltaic systems on net load intermittency","year":2023,"lang":"en","type":"article","venue":"Renewable energy focus","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Intermittency; Photovoltaic system; Environmental science; Load profile; Electricity generation; Electricity; Peak load; Automotive engineering; Power (physics); Meteorology; Engineering; Electrical engineering; Geography","score_opus":0.009730742101488079,"score_gpt":0.22360654865706545,"score_spread":0.21387580655557736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385973020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9741503,0.0001804577,0.0017233236,0.0002871532,0.000048471804,0.000010966412,0.00076029345,0.000102191945,0.02273688],"genre_scores_gemma":[0.99912125,0.000032454132,0.00006070723,0.000012563466,0.0000074478107,0.0000010963438,0.000099697,0.000007743789,0.0006569784],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997148,0.00008516481,0.000010929836,0.000030374586,0.00008612245,0.000072555784],"domain_scores_gemma":[0.9980392,0.0013557127,0.00011783213,0.000079187856,0.00031393746,0.000094193005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005885751,0.00020217262,0.0002937462,0.0003067214,0.0002771016,0.0008905457,0.00025857356,0.00039365567,0.0069395322],"category_scores_gemma":[0.0026766493,0.00012642321,0.00030927575,0.0005087279,0.00023474515,0.0007441453,0.00039884125,0.00046183012,0.00036854993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028908092,0.00047040413,0.16859075,0.0002475371,0.00036369084,0.0023961444,0.0001926867,0.7095481,0.02197817,0.020870818,0.0065489328,0.06590195],"study_design_scores_gemma":[0.000090435096,0.0010523456,0.44798842,0.00006454549,0.00033514402,0.0007512818,0.0008341539,0.5198851,0.012424455,0.011939318,0.0045816777,0.000053133586],"about_ca_topic_score_codex":0.00478321,"about_ca_topic_score_gemma":0.007597599,"teacher_disagreement_score":0.0069395322,"about_ca_system_score_codex":0.0006372848,"about_ca_system_score_gemma":0.00027978307,"threshold_uncertainty_score":0.023215055},"labels":[],"label_agreement":null},{"id":"W4386028983","doi":"10.3390/s23167288","title":"Towards Feasible Solutions for Load Monitoring in Quebec Residences","year":2023,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Identification (biology); Implementation; Computer science; Electricity; Aggregate (composite); Smart meter; Risk analysis (engineering); Data science; Engineering; Business; Software engineering","score_opus":0.04256402380893445,"score_gpt":0.2656905725245547,"score_spread":0.22312654871562024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386028983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32112864,0.0016460593,0.6299619,0.0063896812,0.00013788266,0.0009120926,0.0065965685,0.003578245,0.029648904],"genre_scores_gemma":[0.8117031,0.0005249149,0.17088929,0.00038841832,0.000040924082,0.00027093172,0.0038207043,0.00012838418,0.012233274],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926966,0.00017645127,0.00002333469,0.00022754516,0.00012359093,0.0001793081],"domain_scores_gemma":[0.9990785,0.00026338227,0.00007789843,0.00009404646,0.00039551224,0.000090668305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009152243,0.00095383206,0.0005293445,0.0010009668,0.0013322427,0.0022315949,0.0019060115,0.0010782799,0.004337328],"category_scores_gemma":[0.0025663858,0.00036029692,0.00051723525,0.0013606688,0.000590606,0.0011233942,0.0013158715,0.0006977318,0.00053217425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003676232,0.0002782238,0.04261558,0.0003954576,0.00016497426,0.0009246348,0.0008915829,0.6128191,0.008880092,0.04009882,0.024685092,0.26787895],"study_design_scores_gemma":[0.00003457921,0.000041026102,0.012653016,0.000054011685,0.000029009188,0.00006272448,0.0010699532,0.9651481,0.0015436241,0.0076046097,0.011720773,0.000038551407],"about_ca_topic_score_codex":0.7930943,"about_ca_topic_score_gemma":0.8438471,"teacher_disagreement_score":0.20690572,"about_ca_system_score_codex":0.009581809,"about_ca_system_score_gemma":0.007554717,"threshold_uncertainty_score":0.41624844},"labels":[],"label_agreement":null},{"id":"W4386065631","doi":"10.1109/tia.2023.3307347","title":"Resilient Event Detection Algorithm for Non-Intrusive Load Monitoring Under Non-Ideal Conditions Using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; York University; Polytechnique Montréal","funders":"","keywords":"Computer science; Event (particle physics); Reinforcement learning; Ideal (ethics); Grid; Smart grid; Real-time computing; Algorithm; Data mining; Artificial intelligence; Engineering; Mathematics","score_opus":0.019303920762685924,"score_gpt":0.2760254077934813,"score_spread":0.25672148703079534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386065631","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07551064,0.00025556452,0.91967887,0.0002437242,0.00007752614,0.0001053894,0.000049775877,0.002337096,0.0017413665],"genre_scores_gemma":[0.9135499,0.00006501754,0.08468905,0.00013271118,0.000028531389,0.00008047161,0.0001081349,0.000042405474,0.0013038386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999458,0.00010811189,0.00003981738,0.00018790552,0.00012107287,0.00008507369],"domain_scores_gemma":[0.99871254,0.00063012424,0.00020004853,0.000109137625,0.00026631897,0.00008180721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012682725,0.00071481714,0.0008247304,0.0005006498,0.00035657338,0.0006149485,0.0011566948,0.00060114113,0.0010652984],"category_scores_gemma":[0.003279314,0.00023197244,0.00033969452,0.0002608357,0.00047952298,0.00075812003,0.0006848051,0.0012211604,0.0003140054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003481773,0.00039871284,0.0070179254,0.0000848627,0.00007948048,0.00014500992,0.00011608541,0.66851974,0.008263847,0.0032419069,0.0023813297,0.3094029],"study_design_scores_gemma":[0.000009666312,0.00003258105,0.00024790128,0.000002243017,0.0000035513265,0.000015587051,0.000004992522,0.99781644,0.0010885969,0.0006061058,0.00016875824,0.000003551848],"about_ca_topic_score_codex":0.0032851992,"about_ca_topic_score_gemma":0.0030172048,"teacher_disagreement_score":0.0032851992,"about_ca_system_score_codex":0.0006566519,"about_ca_system_score_gemma":0.000987487,"threshold_uncertainty_score":0.0067073107},"labels":[],"label_agreement":null},{"id":"W4386066677","doi":"10.1109/smartnets58706.2023.10215762","title":"Appliances Operation Modes Identification Using States Clustering","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Cluster analysis; Identification (biology); Energy conservation; Energy consumption; Computer science; Internet of Things; Energy management; Energy (signal processing); Power consumption; Power (physics); Computer security; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.02850793559779548,"score_gpt":0.24760880142037578,"score_spread":0.2191008658225803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386066677","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22746134,0.00024533752,0.7598631,0.00017080017,0.000052922373,0.00019334434,0.001087348,0.0022428434,0.008682952],"genre_scores_gemma":[0.9276098,0.00012163931,0.06853166,0.000024710875,0.000015128895,0.000077321376,0.0013633061,0.000056908255,0.0021995143],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99964666,0.00004956865,0.000026640551,0.00011955373,0.00010953273,0.00004799916],"domain_scores_gemma":[0.9996774,0.00006829909,0.00006596269,0.000056952773,0.000114176844,0.000017119073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002444525,0.000544821,0.0003573077,0.0017938559,0.00038657847,0.0006703802,0.00037279903,0.00030829868,0.0011771764],"category_scores_gemma":[0.0009967107,0.00019197473,0.000548697,0.0012639806,0.00028251472,0.0006514942,0.0004611208,0.00033408456,0.0005765285],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005661724,0.00029890638,0.050090183,0.00017542121,0.0001898808,0.00033877508,0.0007977008,0.23404646,0.029887348,0.009956052,0.0073711164,0.66628194],"study_design_scores_gemma":[0.000008219964,0.000064688335,0.018813603,0.000024537918,0.000034825858,0.0001474131,0.0002891895,0.9602973,0.010045695,0.0064021274,0.003836782,0.00003555333],"about_ca_topic_score_codex":0.008059418,"about_ca_topic_score_gemma":0.008558379,"teacher_disagreement_score":0.008059418,"about_ca_system_score_codex":0.00043527005,"about_ca_system_score_gemma":0.00057654304,"threshold_uncertainty_score":0.016025007},"labels":[],"label_agreement":null},{"id":"W4386070836","doi":"10.11159/eee23.103","title":"Deep Reinforcement Learning-Based Governor for Pumped Storage Hydropower","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Governor; Hydropower; Reinforcement learning; Computer science; Reinforcement; Artificial intelligence; Engineering; Electrical engineering; Aerospace engineering; Structural engineering","score_opus":0.00565938266256727,"score_gpt":0.18960499314567203,"score_spread":0.18394561048310476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386070836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16002104,0.0005436971,0.83205104,0.00042994108,0.0001132778,0.00007526091,0.000089997215,0.0022309825,0.004444805],"genre_scores_gemma":[0.9687997,0.000062500425,0.028905496,0.00007496811,0.000012197789,0.000039023173,0.000056831792,0.000024129153,0.0020251384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99988973,0.000025962296,0.000006164604,0.000026061298,0.00002744899,0.000024613282],"domain_scores_gemma":[0.99965537,0.00016578333,0.000045110788,0.000024350209,0.000077429984,0.000031884752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005165297,0.0004181022,0.00051610474,0.00020708721,0.00019376056,0.00038766622,0.0007697447,0.0005397347,0.0012701808],"category_scores_gemma":[0.0011887952,0.0002921489,0.00021263337,0.00015571738,0.0004576321,0.00041906626,0.0004840827,0.0009294036,0.00018048295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007503537,0.00006553458,0.0011671026,0.00003389177,0.000020948666,0.000053811276,0.000036617657,0.94508964,0.0024822748,0.0021910425,0.000771822,0.048012383],"study_design_scores_gemma":[0.0000034349994,0.000014672324,0.000051787294,0.0000010786473,0.0000011415963,0.0000022678921,0.0000010599312,0.9993218,0.00024296685,0.00027267914,0.00008611963,0.0000010295214],"about_ca_topic_score_codex":0.007490068,"about_ca_topic_score_gemma":0.00890924,"teacher_disagreement_score":0.007490068,"about_ca_system_score_codex":0.00066238863,"about_ca_system_score_gemma":0.00093784125,"threshold_uncertainty_score":0.014892936},"labels":[],"label_agreement":null},{"id":"W4386214540","doi":"10.1109/iscc58397.2023.10217998","title":"Variational Auto-Encoder Model and Federated Approach for Non-Intrusive Load Monitoring in Smart Homes","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Encoder; Sequence (biology); Energy consumption; Point (geometry); State (computer science); Power consumption; Autoencoder; Energy (signal processing); Power (physics); Real-time computing; Data mining; Artificial intelligence; Deep learning; Algorithm; Engineering; Operating system; Mathematics","score_opus":0.017409027688702422,"score_gpt":0.2240530306082367,"score_spread":0.20664400291953428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386214540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052791584,0.00054703985,0.9440693,0.00045553956,0.000046131077,0.000032672924,0.00016831537,0.0008088836,0.0010805649],"genre_scores_gemma":[0.91499865,0.00021134396,0.08077514,0.00021779274,0.0000474642,0.00005966354,0.00037944768,0.00007727341,0.0032332693],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999201,0.00035109333,0.000034025707,0.00021625942,0.00010984984,0.000087795095],"domain_scores_gemma":[0.99811697,0.0013038291,0.000113221235,0.00019332784,0.00021431917,0.000058362224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022957863,0.00072170515,0.0011842032,0.00036827565,0.00030809094,0.00079845445,0.0014366994,0.0010759204,0.001282389],"category_scores_gemma":[0.0048699216,0.0005135126,0.0006611446,0.00047514567,0.00070260215,0.0015349728,0.0011002555,0.0016182377,0.00026041997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015995739,0.00008411432,0.0015999394,0.000042259773,0.00007295125,0.00008045987,0.00007048662,0.93836504,0.0010530868,0.0063460227,0.000989983,0.05113571],"study_design_scores_gemma":[0.0000026329894,0.000009195306,0.00008191849,0.0000015067907,0.0000030257008,0.0000073254055,0.0000029807977,0.9981217,0.00020622846,0.0014844951,0.00007683599,0.000002234101],"about_ca_topic_score_codex":0.009268425,"about_ca_topic_score_gemma":0.009151211,"teacher_disagreement_score":0.009268425,"about_ca_system_score_codex":0.00078000803,"about_ca_system_score_gemma":0.0011145094,"threshold_uncertainty_score":0.018428981},"labels":[],"label_agreement":null},{"id":"W4386256938","doi":"10.32920/24050739","title":"Beyond the Net Benefits Test: Optimizing Economic Demand Response","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Market power; Procurement; Market clearing; Demand response; Commission; Economics; Order (exchange); Energy market; Microeconomics; Harm; Economic surplus; Business; Industrial organization; Welfare; Renewable energy; Market economy; Electricity; Finance; Engineering","score_opus":0.01913528671685326,"score_gpt":0.2146364460742091,"score_spread":0.19550115935735585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386256938","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049227074,0.0005479474,0.90203315,0.0015923817,0.00018422595,0.00017105698,0.00016586733,0.00023858783,0.04583964],"genre_scores_gemma":[0.86187327,0.0005238771,0.12518576,0.00031461133,0.00008591231,0.0001712216,0.00013097202,0.00021442845,0.011499963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910957,0.0004684739,0.000021606718,0.000106804706,0.00016937255,0.00012415714],"domain_scores_gemma":[0.99905425,0.00063102314,0.00008301396,0.00004235662,0.00013525014,0.000054097916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001861839,0.00078094396,0.0007874835,0.00035908545,0.00038296983,0.0018242482,0.00089688634,0.0008485509,0.0059727184],"category_scores_gemma":[0.0035739578,0.0004714455,0.0005591681,0.0005790984,0.0007951326,0.001958447,0.0010978789,0.0016986125,0.00053721725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051932973,0.00005219812,0.00022711724,0.00005759513,0.000013834726,0.000045803943,0.000030567433,0.9376463,0.0006453026,0.044251077,0.0014968511,0.015481392],"study_design_scores_gemma":[0.000008557404,0.00004008853,0.00005431758,0.000006140398,0.0000040963637,0.000007337035,0.000026068024,0.98906714,0.00024245099,0.009337265,0.0012014672,0.000005017797],"about_ca_topic_score_codex":0.0029349155,"about_ca_topic_score_gemma":0.0028931526,"teacher_disagreement_score":0.0059727184,"about_ca_system_score_codex":0.0012127969,"about_ca_system_score_gemma":0.0017954337,"threshold_uncertainty_score":0.019980729},"labels":[],"label_agreement":null},{"id":"W4386257110","doi":"10.32920/24050739.v1","title":"Beyond the Net Benefits Test: Optimizing Economic Demand Response","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Market power; Procurement; Market clearing; Economics; Commission; Order (exchange); Energy market; Microeconomics; Harm; Demand response; Economic surplus; Welfare; Industrial organization; Business; Renewable energy; Market economy; Electricity; Finance; Engineering","score_opus":0.01913528671685326,"score_gpt":0.2146364460742091,"score_spread":0.19550115935735585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386257110","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049227074,0.0005479474,0.90203315,0.0015923817,0.00018422595,0.00017105698,0.00016586733,0.00023858783,0.04583964],"genre_scores_gemma":[0.86187327,0.0005238771,0.12518576,0.00031461133,0.00008591231,0.0001712216,0.00013097202,0.00021442845,0.011499963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910957,0.0004684739,0.000021606718,0.000106804706,0.00016937255,0.00012415714],"domain_scores_gemma":[0.99905425,0.00063102314,0.00008301396,0.00004235662,0.00013525014,0.000054097916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001861839,0.00078094396,0.0007874835,0.00035908545,0.00038296983,0.0018242482,0.00089688634,0.0008485509,0.0059727184],"category_scores_gemma":[0.0035739578,0.0004714455,0.0005591681,0.0005790984,0.0007951326,0.001958447,0.0010978789,0.0016986125,0.00053721725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051932973,0.00005219812,0.00022711724,0.00005759513,0.000013834726,0.000045803943,0.000030567433,0.9376463,0.0006453026,0.044251077,0.0014968511,0.015481392],"study_design_scores_gemma":[0.000008557404,0.00004008853,0.00005431758,0.000006140398,0.0000040963637,0.000007337035,0.000026068024,0.98906714,0.00024245099,0.009337265,0.0012014672,0.000005017797],"about_ca_topic_score_codex":0.0029349155,"about_ca_topic_score_gemma":0.0028931526,"teacher_disagreement_score":0.0059727184,"about_ca_system_score_codex":0.0012127969,"about_ca_system_score_gemma":0.0017954337,"threshold_uncertainty_score":0.019980729},"labels":[],"label_agreement":null},{"id":"W4386382737","doi":"10.2139/ssrn.4559023","title":"Transactive Local Energy Markets Enable Community-Level Resource Coordination Using Individual Rewards","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Transactive memory; Resource (disambiguation); Business; Energy (signal processing); Environmental economics; Natural resource economics; Industrial organization; Environmental resource management; Knowledge management; Computer science; Economics","score_opus":0.03695444822660578,"score_gpt":0.2385656884073308,"score_spread":0.20161124018072502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386382737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22995527,0.0002931575,0.67156386,0.0017917942,0.0002791849,0.00021836287,0.00017919317,0.0012825963,0.0944367],"genre_scores_gemma":[0.9820248,0.000046302786,0.012022738,0.00006260764,0.000021920583,0.00004685225,0.000029554136,0.00005827649,0.005687017],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989066,0.00040631948,0.00003933291,0.00024011474,0.00020539726,0.0002022879],"domain_scores_gemma":[0.99642795,0.0016894421,0.00036630844,0.00060235837,0.000392746,0.0005211981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019441167,0.00040034877,0.00064515223,0.0005381905,0.0010030039,0.0036536027,0.0017973686,0.001174123,0.022738537],"category_scores_gemma":[0.007264366,0.00034614024,0.00045638788,0.0009143562,0.0011884521,0.0047338316,0.005090877,0.0014755032,0.00190899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00093515957,0.0009003366,0.0065549747,0.0002909654,0.00020236352,0.0008494574,0.0021292185,0.1886157,0.016907094,0.6042771,0.012489616,0.16584815],"study_design_scores_gemma":[0.00014991713,0.00033496108,0.002441225,0.00004449026,0.00005897567,0.00016359148,0.0018224985,0.5948939,0.0048191203,0.38004377,0.015164782,0.00006273086],"about_ca_topic_score_codex":0.0013274957,"about_ca_topic_score_gemma":0.0025484932,"teacher_disagreement_score":0.022738537,"about_ca_system_score_codex":0.0008103406,"about_ca_system_score_gemma":0.0010611472,"threshold_uncertainty_score":0.07606804},"labels":[],"label_agreement":null},{"id":"W4386445925","doi":"10.1080/01430750.2023.2256332","title":"Optimising a solar-based microgrid system for urban areas: a case study in Edmonton","year":2023,"lang":"en","type":"article","venue":"International Journal of Ambient Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Microgrid; Photovoltaic system; Electricity; Photovoltaics; Fossil fuel; Grid; Environmental economics; Environmental science; Solar energy; Civil engineering; Engineering; Environmental engineering; Waste management; Electrical engineering; Geography; Economics","score_opus":0.014626148660348328,"score_gpt":0.2486404317042783,"score_spread":0.23401428304392996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386445925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98709804,0.00015939515,0.004240409,0.000120953744,0.0000074712952,0.00006682771,0.00015383564,0.00006957749,0.008083499],"genre_scores_gemma":[0.9942226,0.000085984866,0.0027251295,0.00001193987,0.0000013357496,0.000014545191,0.000088155146,0.000007513116,0.002842788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99989355,0.000029128707,0.0000027025326,0.000013467519,0.000020259817,0.000040813116],"domain_scores_gemma":[0.9998884,0.000051074403,0.000009149638,0.000007093309,0.0000221112,0.000022004948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026814235,0.0006391427,0.00036560238,0.00030356873,0.0007071044,0.00079734216,0.00072478846,0.0007337305,0.0014594648],"category_scores_gemma":[0.0003332127,0.00027222754,0.00041155587,0.0005177961,0.00046358578,0.00024816405,0.0003486257,0.0003620785,0.00008855024],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009284818,0.00005879863,0.002929319,0.00006292191,0.00002182078,0.0010360162,0.00008390462,0.98925984,0.001531584,0.0006467443,0.00038093192,0.003895265],"study_design_scores_gemma":[0.00006974148,0.00019577418,0.0076334397,0.000018469946,0.000041399548,0.000108056876,0.0006643863,0.9869489,0.0022353327,0.00046159726,0.0016020583,0.000020774281],"about_ca_topic_score_codex":0.41971204,"about_ca_topic_score_gemma":0.5770356,"teacher_disagreement_score":0.58028793,"about_ca_system_score_codex":0.003444349,"about_ca_system_score_gemma":0.0025093607,"threshold_uncertainty_score":0.8345381},"labels":[],"label_agreement":null},{"id":"W4386537063","doi":"10.1063/5.0162717","title":"A comprehensive review of real-time monitoring and controlling challenges for smart grid application and its probable solution","year":2023,"lang":"en","type":"review","venue":"AIP conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Smart grid; Grid; Distributed computing; Real-time computing; Engineering; Electrical engineering; Geography","score_opus":0.07995533207746794,"score_gpt":0.2959179835174424,"score_spread":0.21596265143997448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386537063","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019842375,0.9968862,0.0009680329,0.00037626355,0.00033327885,0.000010877417,0.000038289527,0.000020056377,0.0011684733],"genre_scores_gemma":[0.0013250635,0.9963031,0.0010527858,0.00027843105,0.0003118485,0.000010622974,0.00006191414,0.0000031106908,0.0006531297],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99958724,0.000047484973,0.0000538394,0.0000786748,0.00019629246,0.00003644638],"domain_scores_gemma":[0.9990783,0.00040701785,0.00011086167,0.000031846568,0.00032665418,0.00004531009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094721915,0.00095426105,0.0012894756,0.0021460718,0.00029791557,0.0012226042,0.0011459389,0.0010886338,0.0028264297],"category_scores_gemma":[0.0013616639,0.00040181895,0.00059974845,0.0027277532,0.00038435255,0.002263118,0.0007015403,0.0012128061,0.0013688718],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059012473,0.00009925857,0.0002569202,0.023464952,0.00008077064,0.000109012544,0.000046147023,0.00093394093,0.0044252034,0.0058520553,0.035525005,0.9291478],"study_design_scores_gemma":[0.000012389558,0.00024092125,0.0011289071,0.0046707676,0.00021177587,0.00065179757,0.00009751492,0.00094998477,0.0021970372,0.0032849277,0.9864964,0.000057462956],"about_ca_topic_score_codex":0.0014499286,"about_ca_topic_score_gemma":0.0020973415,"teacher_disagreement_score":0.0028264297,"about_ca_system_score_codex":0.00056943524,"about_ca_system_score_gemma":0.001743929,"threshold_uncertainty_score":0.009455323},"labels":[],"label_agreement":null},{"id":"W4386568018","doi":"10.24018/ejece.2023.7.4.549","title":"Remote Data Acquisition System for Photovoltaic Water Pumping System in Sukkar, Pakistan","year":2023,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"GSM; Data acquisition; Data logger; Microcontroller; Embedded system; Photovoltaic system; Real-time computing; Computer science; Troubleshooting; Database; Computer hardware; Engineering; Operating system; Electrical engineering","score_opus":0.013950398257492435,"score_gpt":0.21123149601171978,"score_spread":0.19728109775422734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386568018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7470358,0.0006120807,0.1963189,0.0007377978,0.00026955552,0.0010498629,0.0045569884,0.019848974,0.029569991],"genre_scores_gemma":[0.96531093,0.00019097229,0.024675654,0.00012551075,0.00003179534,0.00026975185,0.0013301579,0.000108206325,0.007957039],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995308,0.00005928747,0.000032439053,0.000114558505,0.0002120588,0.00005087994],"domain_scores_gemma":[0.9996045,0.000065419816,0.00004711042,0.00004394961,0.00021138407,0.000027722348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036164006,0.00042692904,0.00039591207,0.000620203,0.00068199117,0.000565852,0.00057122036,0.00030585006,0.007767457],"category_scores_gemma":[0.00047392186,0.00017425134,0.0002035298,0.0005418228,0.00023595418,0.0004750089,0.00051524356,0.00032615144,0.0021837978],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010394512,0.0003750738,0.05348583,0.0008148978,0.00007264906,0.0015556389,0.0013677028,0.008691265,0.4054924,0.0011830485,0.0230544,0.5028676],"study_design_scores_gemma":[0.0004620559,0.0024230948,0.13559079,0.00018945147,0.00029543077,0.0023760863,0.0017971983,0.18582278,0.5749214,0.0013712392,0.09452234,0.00022803924],"about_ca_topic_score_codex":0.0030813124,"about_ca_topic_score_gemma":0.0029622188,"teacher_disagreement_score":0.007767457,"about_ca_system_score_codex":0.0004734572,"about_ca_system_score_gemma":0.0007819653,"threshold_uncertainty_score":0.025984764},"labels":[],"label_agreement":null},{"id":"W4386616486","doi":"10.1016/j.epsr.2023.109831","title":"A novel non-intrusive framework for real-time disaggregation of behind-the-meter solar generation from smart meter data","year":2023,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Qatar National Research Fund; Qatar Foundation","keywords":"Smart meter; Photovoltaic system; Observability; Computer science; Smart grid; Robustness (evolution); Metre; Reliability engineering; Real-time computing; Convergence (economics); Engineering; Electrical engineering; Mathematics","score_opus":0.0887192148000105,"score_gpt":0.33379177997805115,"score_spread":0.24507256517804066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386616486","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059745787,0.00019567885,0.9891455,0.0000884529,0.00010392691,0.00007355255,0.00023261161,0.0033906996,0.0007948593],"genre_scores_gemma":[0.43453377,0.0002871693,0.55922973,0.00025766535,0.00036440208,0.00021702264,0.0013752404,0.00038248097,0.0033524767],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860674,0.00019572252,0.00008231032,0.00037645726,0.0005962153,0.00014262056],"domain_scores_gemma":[0.9984863,0.00042093117,0.00016904296,0.00052643096,0.00028506026,0.00011224685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012788787,0.0012410685,0.00138485,0.0010591979,0.0005862419,0.0019182785,0.002593609,0.0009781502,0.0023209807],"category_scores_gemma":[0.003847519,0.00059252133,0.0005798974,0.0014324608,0.00046984278,0.0027185772,0.0031992274,0.0017792484,0.0012846476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012903779,0.0010045047,0.007891398,0.0003888144,0.00048073038,0.0010846509,0.00070159975,0.21343677,0.101065755,0.044707436,0.01841092,0.609537],"study_design_scores_gemma":[0.000019871997,0.000040784922,0.00067026855,0.0000074140116,0.000016245662,0.00011417576,0.000034094697,0.9833017,0.004934127,0.0073728524,0.0034678774,0.00002062325],"about_ca_topic_score_codex":0.0033380874,"about_ca_topic_score_gemma":0.006938017,"teacher_disagreement_score":0.0033380874,"about_ca_system_score_codex":0.0003950506,"about_ca_system_score_gemma":0.0009852368,"threshold_uncertainty_score":0.0077644587},"labels":[],"label_agreement":null},{"id":"W4386752288","doi":"10.1007/978-981-99-3236-8_23","title":"Reviewing Non-intrusive Load Monitoring Using a Pilot Study of an IoT Device to Disaggregate Energy Usage","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Standardization; Energy consumption; Computer science; Process (computing); Task (project management); Internet of Things; Energy (signal processing); Data science; Engineering; Systems engineering; Embedded system","score_opus":0.0397455683792588,"score_gpt":0.251151808546068,"score_spread":0.2114062401668092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386752288","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26624006,0.2846584,0.13305321,0.029932147,0.02733336,0.002099741,0.0015546096,0.0012562273,0.25387233],"genre_scores_gemma":[0.4441228,0.23463435,0.051937234,0.016058596,0.014055519,0.0008526379,0.0019500862,0.00057323027,0.23581563],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995468,0.00011875299,0.00003113768,0.000067515546,0.00021490105,0.000020788151],"domain_scores_gemma":[0.9967012,0.0018400815,0.00013483253,0.000085076346,0.0011874745,0.000051401857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009704539,0.00043095517,0.00026097725,0.0006291107,0.0005272135,0.000812758,0.0005169043,0.00060516456,0.0018991387],"category_scores_gemma":[0.0029032365,0.00013778622,0.0002430115,0.0008073066,0.0003318109,0.0007251961,0.00016127693,0.00053115387,0.0013717846],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019053854,0.0002743496,0.0071798894,0.0031202668,0.000045466728,0.0020632143,0.003507349,0.001332622,0.030820774,0.003873086,0.12988159,0.8177108],"study_design_scores_gemma":[0.00002245306,0.0010932995,0.07649987,0.0029871068,0.00017437976,0.0025273587,0.008813229,0.0030794377,0.02039392,0.003991872,0.8803491,0.000067884794],"about_ca_topic_score_codex":0.004382139,"about_ca_topic_score_gemma":0.016577583,"teacher_disagreement_score":0.004382139,"about_ca_system_score_codex":0.0005403805,"about_ca_system_score_gemma":0.000728597,"threshold_uncertainty_score":0.008713245},"labels":[],"label_agreement":null},{"id":"W4386798810","doi":"10.1016/j.rser.2023.113742","title":"The role of energy communities in electricity grid balancing: A flexible tool for smart grid power distribution optimization","year":2023,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Renewable energy; Grid; Smart grid; Environmental economics; Energy storage; Electricity; Energy management; Computer science; Distributed generation; Intermittent energy source; Demand response; Simulation; Distributed computing; Engineering; Energy (signal processing); Power (physics); Electrical engineering; Economics","score_opus":0.007434359809189869,"score_gpt":0.20632319294312423,"score_spread":0.19888883313393435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386798810","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027852181,0.00023828434,0.96355695,0.0002859423,0.0000576669,0.00010656257,0.000095912954,0.00027426725,0.007532298],"genre_scores_gemma":[0.85613436,0.00034624565,0.13912767,0.00007823073,0.000053992975,0.000300069,0.0001070528,0.0001185464,0.0037338545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964,0.00017659311,0.000012557336,0.000044443095,0.000089240675,0.00003717768],"domain_scores_gemma":[0.99942917,0.00032809164,0.000067596506,0.000048895366,0.000075093725,0.000051195067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087667856,0.00069145416,0.00085900293,0.0004769203,0.00074137235,0.0011369723,0.0013244862,0.0014330352,0.0028292616],"category_scores_gemma":[0.0019559276,0.00040172297,0.0008209449,0.0005853539,0.00072318746,0.0018758811,0.0014863287,0.0009999584,0.00035682076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014667889,0.000020240006,0.00023507689,0.00002285635,0.000010430483,0.000042847605,0.000027691285,0.9833007,0.0005054938,0.009957842,0.00021563414,0.0056465124],"study_design_scores_gemma":[0.000003622152,0.0000068626914,0.000028705097,0.0000036146948,0.0000020623272,0.000006689489,0.00000674438,0.9962451,0.000092537375,0.0032061327,0.00039530257,0.0000027054646],"about_ca_topic_score_codex":0.0036318311,"about_ca_topic_score_gemma":0.0037759943,"teacher_disagreement_score":0.0036318311,"about_ca_system_score_codex":0.0005519389,"about_ca_system_score_gemma":0.0008175576,"threshold_uncertainty_score":0.0094648},"labels":[],"label_agreement":null},{"id":"W4386899209","doi":"10.1109/sefet57834.2023.10245783","title":"Open Source Software-Based Industrial Internet of Things for Aiding Visibility to Distributed Generation","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"General Electric (Canada)","funders":"","keywords":"Computer science; Modbus; Cloud computing; Distributed generation; Distributed computing; Digitization; Vendor; SCADA; Edge computing; The Internet; Enhanced Data Rates for GSM Evolution; Visibility; Software; Computer network; Operating system; Telecommunications; Engineering","score_opus":0.0689852197890973,"score_gpt":0.26876431399757345,"score_spread":0.19977909420847614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386899209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009447754,0.00018582126,0.8710374,0.00026947382,0.0002472034,0.00036493273,0.0014382934,0.10481153,0.012197486],"genre_scores_gemma":[0.20922826,0.00078103365,0.7254555,0.000453254,0.00015296994,0.0009218364,0.01891802,0.030490173,0.013599001],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99908614,0.00013281712,0.00006855187,0.00012084376,0.00049801846,0.00009346707],"domain_scores_gemma":[0.99763,0.000687372,0.00020743688,0.00085538544,0.00045791685,0.00016194736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015041749,0.0011326418,0.00045711306,0.0013378507,0.0005989827,0.0014571159,0.0019230447,0.0009416129,0.0065866015],"category_scores_gemma":[0.0043972204,0.0005376634,0.0011090371,0.0012328258,0.00067570346,0.0021489798,0.0027799266,0.0018233618,0.0027332262],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085224997,0.0010186414,0.0076802853,0.0020581833,0.00049204635,0.002643328,0.00203494,0.058365423,0.10006869,0.06981071,0.12253186,0.6324437],"study_design_scores_gemma":[0.0003205501,0.00032301398,0.011204124,0.00044601015,0.00015095934,0.0013930157,0.00031621792,0.45248574,0.066798314,0.053948145,0.41228527,0.00032860893],"about_ca_topic_score_codex":0.001728064,"about_ca_topic_score_gemma":0.0027281048,"teacher_disagreement_score":0.0065866015,"about_ca_system_score_codex":0.0003549637,"about_ca_system_score_gemma":0.0009512302,"threshold_uncertainty_score":0.022034407},"labels":[],"label_agreement":null},{"id":"W4387005956","doi":"10.1109/pesgm52003.2023.10252545","title":"Effects on Electricity Customers’ Welfare Considering Optimal Generation Dispatch and Emission Reduction in Composite Power Systems","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Centre for Social Innovation","funders":"EMI","keywords":"Reduction (mathematics); Electricity generation; Electricity; Electric power system; Welfare; Composite number; Environmental economics; Economic dispatch; Power (physics); Business; Computer science; Automotive engineering; Natural resource economics; Economics; Electrical engineering; Engineering; Market economy; Mathematics; Thermodynamics; Physics","score_opus":0.008173402896365749,"score_gpt":0.20380367706826916,"score_spread":0.1956302741719034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387005956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7814878,0.00020415636,0.20944826,0.00033619732,0.000031259995,0.00008194014,0.00011886277,0.000071901115,0.008219573],"genre_scores_gemma":[0.99576724,0.000059978916,0.0034734078,0.000011030838,0.000006694051,0.000020650814,0.000027685226,0.000014803014,0.00061859045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909973,0.0005556223,0.00001596073,0.0000668053,0.00012251805,0.00013930447],"domain_scores_gemma":[0.9984876,0.0010077881,0.0001650075,0.000068203546,0.00017547295,0.00009590965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016845504,0.0007446216,0.00060161314,0.0004906988,0.00038053715,0.0012153011,0.00048188787,0.00053133693,0.001731955],"category_scores_gemma":[0.0035288355,0.00022569828,0.0005205768,0.00041589755,0.0007639745,0.00085259957,0.0010820188,0.0005006214,0.00009021017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002139108,0.00013052122,0.0030992345,0.000044555658,0.000059260958,0.0001276314,0.000051421546,0.9780252,0.0013780656,0.0089618545,0.00030469822,0.007603661],"study_design_scores_gemma":[0.0000142651015,0.0001157724,0.0017134929,0.000006576779,0.000030762294,0.000017550658,0.00009768566,0.9917236,0.00047701836,0.005644637,0.0001528015,0.0000058828455],"about_ca_topic_score_codex":0.003175042,"about_ca_topic_score_gemma":0.0028688647,"teacher_disagreement_score":0.003175042,"about_ca_system_score_codex":0.0011045181,"about_ca_system_score_gemma":0.00087128766,"threshold_uncertainty_score":0.008908868},"labels":[],"label_agreement":null},{"id":"W4387006347","doi":"10.1109/pesgm52003.2023.10252246","title":"Energy Allocation of the Community Energy Storage System: A Contribution-Based Incentive Mechanism","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prosumer; Incentive; Computer science; Energy storage; Environmental economics; Energy (signal processing); Index (typography); Interval (graph theory); Microeconomics; Renewable energy; Economics; Engineering; Mathematics; Statistics; Electrical engineering; Power (physics)","score_opus":0.008276517028554854,"score_gpt":0.18358476629230006,"score_spread":0.1753082492637452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387006347","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040295754,0.00034271905,0.95364004,0.0003740658,0.00014425647,0.0002519688,0.000038343696,0.00027135882,0.004641457],"genre_scores_gemma":[0.9270138,0.00018194602,0.069067396,0.00009112831,0.00009801792,0.00018736567,0.000027556931,0.000024305342,0.003308504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9978662,0.0009109494,0.0001242722,0.00036100525,0.00053508685,0.00020254162],"domain_scores_gemma":[0.99785906,0.0007852751,0.00025334622,0.00023237517,0.0006143373,0.00025562436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034893968,0.00080766826,0.0010863919,0.0007872596,0.0008903764,0.0013101527,0.0031969913,0.0012118043,0.0033687335],"category_scores_gemma":[0.0051914393,0.00031972898,0.0004955348,0.0009040276,0.00067308306,0.0023768775,0.002029762,0.0009778901,0.00037376676],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001015395,0.0008379131,0.002698831,0.0005850742,0.0002036551,0.0006327844,0.00047997612,0.5121453,0.03030644,0.13963066,0.0047563543,0.30670768],"study_design_scores_gemma":[0.00006780407,0.00026560042,0.00032738523,0.000022333195,0.000034275483,0.00023930072,0.00005183787,0.9786254,0.0025344614,0.014499431,0.0032983732,0.000033631004],"about_ca_topic_score_codex":0.00063076057,"about_ca_topic_score_gemma":0.00083084387,"teacher_disagreement_score":0.0034893968,"about_ca_system_score_codex":0.0006721885,"about_ca_system_score_gemma":0.0015792421,"threshold_uncertainty_score":0.018453896},"labels":[],"label_agreement":null},{"id":"W4387011247","doi":"10.1109/pesgm52003.2023.10253435","title":"Capacity Market for Distribution System Operator – with Reliability Transactions – Considering Critical Loads and Microgrids","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Provisioning; Demand response; Distributed generation; Reliability (semiconductor); Asset (computer security); Transactive memory; Reliability engineering; Computer science; Social Welfare; Environmental economics; Business; Economics; Computer security; Engineering; Electricity; Computer network; Renewable energy","score_opus":0.010123731663979759,"score_gpt":0.19959775155179074,"score_spread":0.18947401988781098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387011247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20721196,0.0009067952,0.73727036,0.0015883932,0.00021129864,0.00032781332,0.00058486854,0.00027497395,0.051623505],"genre_scores_gemma":[0.9803075,0.00019857008,0.012262276,0.00005091921,0.000033103443,0.000093092516,0.000077352066,0.00003163262,0.006945529],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99918526,0.00035434728,0.000019039288,0.00013846562,0.00013055067,0.00017229811],"domain_scores_gemma":[0.9989166,0.0005710297,0.00012874651,0.0000590536,0.00018168047,0.00014290243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013465387,0.00085560745,0.00081635104,0.00053532777,0.0005592324,0.0020755592,0.0017803473,0.0012802747,0.0073534865],"category_scores_gemma":[0.0028990984,0.0004291023,0.00082286843,0.00062939106,0.00088346034,0.002728359,0.001046479,0.0012918629,0.0002734916],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009760283,0.00005110627,0.00046827475,0.00006485662,0.000030318644,0.00022613231,0.00004075371,0.9137794,0.0008090761,0.07645893,0.0013084034,0.0066651553],"study_design_scores_gemma":[0.000009771535,0.000025309977,0.00009106401,0.000004634166,0.000008070906,0.000030048403,0.000024949088,0.98953295,0.00010751412,0.009667384,0.0004918683,0.000006494321],"about_ca_topic_score_codex":0.009983947,"about_ca_topic_score_gemma":0.008850755,"teacher_disagreement_score":0.009983947,"about_ca_system_score_codex":0.0021046884,"about_ca_system_score_gemma":0.0021525729,"threshold_uncertainty_score":0.02459985},"labels":[],"label_agreement":null},{"id":"W4387011272","doi":"10.1109/pesgm52003.2023.10253301","title":"Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism with Transactive DERs","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Distributed generation; Demand response; Renewable energy; Load management; Electric power system; Environmental economics; Transactive memory; Computer science; Electricity; Business; Reliability engineering; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.011629373278177093,"score_gpt":0.17393018537257815,"score_spread":0.16230081209440106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387011272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041381143,0.00032921985,0.9427507,0.0003303379,0.00010767678,0.0003758984,0.00013497609,0.00047081502,0.014119172],"genre_scores_gemma":[0.9431173,0.00014266498,0.05347502,0.00006497483,0.000032269432,0.00016571379,0.000056480785,0.00002290291,0.0029226285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981589,0.0008155429,0.00009673729,0.00031616917,0.00033655486,0.00027618321],"domain_scores_gemma":[0.9985287,0.0006481146,0.0002497256,0.00019285249,0.00021478516,0.0001658149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022916093,0.0008011479,0.0010780288,0.000540328,0.00045352886,0.0015315564,0.0028055976,0.00095351,0.0042608096],"category_scores_gemma":[0.0026415398,0.0004788205,0.0006757437,0.0010871176,0.00088433793,0.0017619972,0.0013605457,0.00095169654,0.00040364583],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043598443,0.00021121388,0.00053471903,0.00017500228,0.00011944263,0.0006836836,0.00012852032,0.86330324,0.003986302,0.08892492,0.002667399,0.038829546],"study_design_scores_gemma":[0.00006034012,0.00007334744,0.00006953853,0.0000062529434,0.000015506617,0.00014379616,0.000017408225,0.9856575,0.0006020079,0.012328757,0.0010102381,0.000015246293],"about_ca_topic_score_codex":0.0018200635,"about_ca_topic_score_gemma":0.002209445,"teacher_disagreement_score":0.0042608096,"about_ca_system_score_codex":0.0010889568,"about_ca_system_score_gemma":0.0017795567,"threshold_uncertainty_score":0.014253795},"labels":[],"label_agreement":null},{"id":"W4387027427","doi":"10.1109/pesgm52003.2023.10252866","title":"Learning a Multi-Agent Controller for Shared Energy Storage System","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Computer science; Reinforcement learning; Software deployment; Installation; Energy storage; Electricity; Schedule; Demand response; Scheduling (production processes); Smart grid; Real-time computing; Power (physics); Simulation; Operating system; Electrical engineering; Engineering; Operations management","score_opus":0.017711196581643048,"score_gpt":0.20916508949491994,"score_spread":0.19145389291327689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387027427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060555365,0.0005092365,0.9276381,0.00045094796,0.0002014902,0.00014918362,0.00007227732,0.0011328016,0.009290572],"genre_scores_gemma":[0.97930133,0.000082957005,0.018144263,0.00009108629,0.00003457608,0.0001243827,0.00003536654,0.000015388294,0.002170675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961746,0.000071715745,0.000024606486,0.00011260113,0.00008781829,0.00008580321],"domain_scores_gemma":[0.99941623,0.000216442,0.000101573365,0.00003903619,0.00016216307,0.00006449233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007294606,0.00078878587,0.0008548936,0.0002535286,0.0005709991,0.0009777676,0.001208735,0.00089398684,0.0031715308],"category_scores_gemma":[0.001400271,0.00029953808,0.00036436232,0.00019577082,0.00056364335,0.0006256009,0.0010695282,0.0010877314,0.00036697998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015230993,0.000093891555,0.0006803506,0.000092923525,0.00005769698,0.00015819402,0.000061095874,0.9587746,0.0032290511,0.004631635,0.0012316362,0.03083667],"study_design_scores_gemma":[0.000015727532,0.000028584349,0.000042661573,0.0000025686836,0.000004957665,0.00000718569,0.000003901036,0.9990307,0.00021696473,0.00045244375,0.00019163146,0.0000026892271],"about_ca_topic_score_codex":0.0055203517,"about_ca_topic_score_gemma":0.005196413,"teacher_disagreement_score":0.0055203517,"about_ca_system_score_codex":0.0005713157,"about_ca_system_score_gemma":0.0010754019,"threshold_uncertainty_score":0.010976434},"labels":[],"label_agreement":null},{"id":"W4387039521","doi":"10.1049/icp.2023.0518","title":"The EUniversal Portuguese demonstrator: from MV-LV coordinated identification of flexibility needs to activation through the UMEI","year":2023,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Flexibility (engineering); European union; Process (computing); Portuguese; Computer science; Identification (biology); Key (lock); Grid; Interface (matter); Core (optical fiber); Process management; Systems engineering; Risk analysis (engineering); Business; Engineering; Telecommunications; Computer security; Operating system","score_opus":0.025206995964060525,"score_gpt":0.24238127119418612,"score_spread":0.21717427523012559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387039521","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57495606,0.0003149946,0.22356333,0.0031632714,0.00051681185,0.0003641863,0.0010470037,0.0025723225,0.19350204],"genre_scores_gemma":[0.95283115,0.000105474006,0.029583767,0.0002160233,0.000039579165,0.000092642644,0.00034342747,0.00015228141,0.01663572],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995623,0.00018126403,0.000015387634,0.00007282538,0.0001033297,0.0000649528],"domain_scores_gemma":[0.99958414,0.00015831718,0.000030269615,0.00008157549,0.000072299525,0.00007339719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010779912,0.00032207518,0.00024899692,0.00015200156,0.000540736,0.0012772067,0.0005530037,0.00096199894,0.007517957],"category_scores_gemma":[0.0018133913,0.00014789063,0.0001935794,0.00016201753,0.0005895419,0.0012761689,0.0017289354,0.00088960945,0.0009307643],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005333488,0.0013454031,0.012774821,0.0019034157,0.00014583398,0.0115157915,0.023425762,0.10632102,0.2161496,0.21225016,0.073576376,0.33525833],"study_design_scores_gemma":[0.0009117358,0.0032201584,0.018209927,0.0005414995,0.000106103005,0.0021778417,0.010798691,0.24117684,0.19881319,0.0403213,0.48350847,0.00021433007],"about_ca_topic_score_codex":0.0017861011,"about_ca_topic_score_gemma":0.0026445552,"teacher_disagreement_score":0.007517957,"about_ca_system_score_codex":0.00032304326,"about_ca_system_score_gemma":0.00044327023,"threshold_uncertainty_score":0.02515012},"labels":[],"label_agreement":null},{"id":"W4387039737","doi":"10.1049/icp.2023.0264","title":"A new customer-oriented approach for residential demand-side flexibility: the case of the Zeeland region in the Netherlands","year":2023,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fractal Systems (Canada)","funders":"","keywords":"Flexibility (engineering); Renewable energy; Electricity; Monetization; Volatility (finance); Carbon footprint; Environmental economics; Smart grid; Demand side; Load shifting; Electricity price; Business; Demand response; Consumption (sociology); Natural resource economics; Economics; Engineering; Electrical engineering; Finance","score_opus":0.03336856792827768,"score_gpt":0.25032036958349874,"score_spread":0.21695180165522104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387039737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7692676,0.0009034098,0.022693219,0.004543876,0.00008740367,0.00009794256,0.00071864075,0.0000726461,0.2016152],"genre_scores_gemma":[0.98784095,0.00023636466,0.002494732,0.00007042034,0.000008642298,0.000015190113,0.000086329615,0.000026631476,0.00922083],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9994604,0.00024844616,0.000016826914,0.00007421778,0.00007889162,0.00012126001],"domain_scores_gemma":[0.9997445,0.00010230563,0.000026425965,0.000027685328,0.000052694428,0.00004639419],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044903994,0.0002050718,0.00024451426,0.00034463793,0.0010508572,0.0027436332,0.0012000026,0.0014648541,0.004610049],"category_scores_gemma":[0.0012050776,0.00026702724,0.00045280854,0.0008187356,0.00079951156,0.0018820211,0.0013035807,0.0007280945,0.0003141392],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046255544,0.00033911885,0.041739874,0.00037130775,0.00023873478,0.0671281,0.013008082,0.29796016,0.01000027,0.49346453,0.023317283,0.051969916],"study_design_scores_gemma":[0.0002174611,0.00016393377,0.051840354,0.0003015977,0.00015518538,0.009187099,0.06599642,0.5064078,0.004193314,0.11467179,0.24651028,0.00035481018],"about_ca_topic_score_codex":0.13050194,"about_ca_topic_score_gemma":0.18516555,"teacher_disagreement_score":0.13050194,"about_ca_system_score_codex":0.003715356,"about_ca_system_score_gemma":0.0012133002,"threshold_uncertainty_score":0.25948465},"labels":[],"label_agreement":null},{"id":"W4387349009","doi":"10.2139/ssrn.4592042","title":"Can You Lower the Thermostat? Perceptions of Demand Response Programs in Quebec","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Thermostat; Demand response; Perception; Economics; Business; Psychology; Electrical engineering; Engineering","score_opus":0.013632048800866447,"score_gpt":0.22745133491307712,"score_spread":0.21381928611221068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387349009","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747853,0.00035753084,0.00016319037,0.007906946,0.00003442806,0.000029840074,0.00027441364,0.000009597955,0.016438775],"genre_scores_gemma":[0.9941345,0.00018588005,0.00005948998,0.00063697324,0.0000054771217,0.00000909643,0.00006772738,0.000006954191,0.004893952],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984465,0.0004450073,0.000043395085,0.00011076621,0.0003725991,0.0005816917],"domain_scores_gemma":[0.992781,0.0014954483,0.00087811303,0.00009044925,0.0022348703,0.0025201046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016598445,0.00018134322,0.00023664789,0.0006397128,0.00514385,0.0034321477,0.0009267177,0.0010737537,0.010113518],"category_scores_gemma":[0.006285165,0.00023403561,0.00033898055,0.0012761373,0.0017131991,0.0011764286,0.001006519,0.002095849,0.00030087784],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007003424,0.0009856919,0.70276856,0.0001611154,0.00016532022,0.0012357653,0.20039126,0.0021666773,0.0020487853,0.011182324,0.029972393,0.04822177],"study_design_scores_gemma":[0.000052740877,0.00018357008,0.64346445,0.00024937547,0.0000453342,0.000083957835,0.30568665,0.0029015865,0.0003267121,0.00051586074,0.046355277,0.00013439498],"about_ca_topic_score_codex":0.9881181,"about_ca_topic_score_gemma":0.9934343,"teacher_disagreement_score":0.046102606,"about_ca_system_score_codex":0.046102606,"about_ca_system_score_gemma":0.020517342,"threshold_uncertainty_score":0.33449936},"labels":[],"label_agreement":null},{"id":"W4387374361","doi":"10.1016/j.jobe.2023.107877","title":"IoT-assisted energy cooperation in adjacent buildings with interrupted utility","year":2023,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"News aggregator; Renewable energy; Efficient energy use; Computer science; Electricity; Work (physics); Energy management; Electricity generation; Energy consumption; Reliability engineering; Energy (signal processing); Power (physics); Environmental economics; Engineering; Telecommunications; Architectural engineering; Electrical engineering; Economics; Mechanical engineering","score_opus":0.009639529783990249,"score_gpt":0.19941644884558302,"score_spread":0.18977691906159277,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387374361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88575274,0.000120976845,0.106143534,0.0002240047,0.00011102878,0.00004019578,0.000069929,0.00029753617,0.007239972],"genre_scores_gemma":[0.9985202,0.000008117643,0.0010686608,0.0000044877106,0.0000030444123,0.0000031112538,0.000015116946,0.000002827663,0.00037439464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996352,0.00011360517,0.000016705131,0.00006814324,0.000054154003,0.00011220382],"domain_scores_gemma":[0.99935144,0.00025073971,0.000060606082,0.00009877141,0.00012805493,0.00011037131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005364643,0.00036850004,0.00051882124,0.00022553523,0.0007235659,0.00071430503,0.0007760571,0.000653477,0.0017964758],"category_scores_gemma":[0.000785816,0.00016476386,0.00034876296,0.00034321117,0.00042503208,0.0008961598,0.0012273917,0.00041320897,0.0003013722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039398856,0.00072445336,0.03737924,0.00016432637,0.00019323252,0.008843705,0.000892026,0.78600895,0.05331899,0.01283864,0.0044577657,0.09123873],"study_design_scores_gemma":[0.00001540103,0.00017248164,0.0029372019,0.0000048090874,0.000029624893,0.00034796091,0.0005170047,0.9870908,0.00561512,0.002511942,0.00074552477,0.000012187867],"about_ca_topic_score_codex":0.001562801,"about_ca_topic_score_gemma":0.002222599,"teacher_disagreement_score":0.0017964758,"about_ca_system_score_codex":0.0002953449,"about_ca_system_score_gemma":0.00039061633,"threshold_uncertainty_score":0.006009817},"labels":[],"label_agreement":null},{"id":"W4387385672","doi":"10.1109/access.2023.3322193","title":"Data-Efficient MADDPG Based on Self-Attention for IoT Energy Management Systems","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Computer science; Scalability; Exploit; Dependency (UML); Distributed computing; Artificial intelligence; Machine learning; Computer security; Database","score_opus":0.04216583175407556,"score_gpt":0.27609299265596815,"score_spread":0.23392716090189258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387385672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07295642,0.0008732742,0.91974187,0.0005879445,0.00014263508,0.00008082396,0.00013242562,0.0012435747,0.0042409413],"genre_scores_gemma":[0.9671705,0.00012831853,0.030831242,0.0001753505,0.000023949555,0.0000741732,0.000097791984,0.000037035403,0.0014616912],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979156,0.000033751763,0.000015498805,0.000063353094,0.000046928017,0.00004889239],"domain_scores_gemma":[0.99966216,0.00014536342,0.000044491873,0.000027894821,0.00009206384,0.000028046039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058407785,0.000689671,0.000824846,0.00030621068,0.00036635794,0.00069811195,0.0012446287,0.0007466033,0.0015328579],"category_scores_gemma":[0.0013334823,0.00040937407,0.0004341392,0.00033749212,0.0005325848,0.00084752013,0.0008966466,0.0011708284,0.0002066058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006176919,0.000055288816,0.0011531473,0.000053233143,0.000030312822,0.00009426172,0.00005330447,0.95157546,0.0018110682,0.003838557,0.00091970165,0.040353954],"study_design_scores_gemma":[0.0000025436857,0.000008426209,0.000052722655,0.0000014453785,0.0000024427882,0.0000035956452,0.0000018381825,0.9990397,0.0001498215,0.0006381276,0.00009794511,0.0000014515796],"about_ca_topic_score_codex":0.011786792,"about_ca_topic_score_gemma":0.009332699,"teacher_disagreement_score":0.011786792,"about_ca_system_score_codex":0.0009039876,"about_ca_system_score_gemma":0.0011296382,"threshold_uncertainty_score":0.023436368},"labels":[],"label_agreement":null},{"id":"W4387425195","doi":"10.1016/j.energy.2023.129297","title":"New coordination framework for smart home peer-to-peer trading to reduce impact on distribution transformer","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Smart grid; Distributed generation; Distribution transformer; Transformer; Electric power system; Power transmission; Grid; AC power; Reliability engineering; Computer science; Environmental economics; Electrical engineering; Engineering; Renewable energy; Power (physics); Economics","score_opus":0.015583205023295691,"score_gpt":0.26996279958022784,"score_spread":0.25437959455693215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387425195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010877971,0.00017231485,0.9759906,0.0002627711,0.00023578829,0.00020783494,0.00010457057,0.0044716117,0.00767651],"genre_scores_gemma":[0.6821605,0.00017215416,0.30444604,0.00026651466,0.00019377274,0.00027611572,0.00042851802,0.00036983003,0.011686594],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849606,0.00031321432,0.00011650711,0.00034819968,0.00048991066,0.0002360294],"domain_scores_gemma":[0.9989772,0.00021933827,0.00007125952,0.00023057325,0.00032337854,0.00017845021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002047632,0.00057832187,0.0010713811,0.0005239864,0.0012226898,0.0022433952,0.0025571962,0.0011329273,0.0058398056],"category_scores_gemma":[0.0022913783,0.0002947081,0.00058692426,0.00048017845,0.00065291015,0.0025162892,0.0021692128,0.0013332926,0.0012249867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012315966,0.0010497137,0.0023988495,0.0003233247,0.0002418072,0.0011230959,0.00076748466,0.24370706,0.035765734,0.26407456,0.05556458,0.39375216],"study_design_scores_gemma":[0.00009968309,0.000090987385,0.00021976455,0.000013661762,0.00004249747,0.00017848765,0.00007294098,0.94664186,0.006482193,0.028258665,0.017862992,0.00003629172],"about_ca_topic_score_codex":0.0043069455,"about_ca_topic_score_gemma":0.005435343,"teacher_disagreement_score":0.0058398056,"about_ca_system_score_codex":0.00083266996,"about_ca_system_score_gemma":0.0018633902,"threshold_uncertainty_score":0.019536078},"labels":[],"label_agreement":null},{"id":"W4387475923","doi":"10.1109/sege59172.2023.10274535","title":"Strategic Prosumer-Side Energy Trading Using A Parameter Independent Convex Model: From A Discussion Toward A Case Study","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"","keywords":"Prosumer; Profit (economics); Computer science; Regular polygon; Renewable energy; Scalability; Energy management; Profit model; Operations research; Mathematical optimization; Industrial organization; Environmental economics; Business; Energy (signal processing); Microeconomics; Economics; Engineering; Mathematics","score_opus":0.0789425799477115,"score_gpt":0.2689935874096079,"score_spread":0.19005100746189638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387475923","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14817493,0.0032947708,0.76041776,0.0032493672,0.00020879033,0.00024140983,0.00041332937,0.0001670474,0.08383262],"genre_scores_gemma":[0.97097754,0.0011235336,0.019160116,0.00013822697,0.00006692798,0.00011863174,0.00006672367,0.000035387096,0.008313031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999532,0.00024628575,0.000012514688,0.00006232997,0.00006684211,0.00008009389],"domain_scores_gemma":[0.9989549,0.0007096398,0.000113266375,0.000053031115,0.00011083075,0.000058307196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010341716,0.0011017759,0.0008811455,0.00037381003,0.0006420295,0.0023190824,0.0011678693,0.0020139068,0.0042889817],"category_scores_gemma":[0.0020373052,0.000378761,0.0010871341,0.00057989935,0.001058257,0.0014098006,0.0014858306,0.0019567655,0.00038188833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054961092,0.0000592144,0.0004987408,0.00008240713,0.000024011457,0.00052008807,0.00007485844,0.9343441,0.000578408,0.058611024,0.0012958135,0.0038562831],"study_design_scores_gemma":[0.000009650101,0.000034202658,0.000103738865,0.000012831454,0.000014315764,0.000055090826,0.000061225546,0.98840135,0.00012876879,0.010239014,0.0009309628,0.000008899853],"about_ca_topic_score_codex":0.007039286,"about_ca_topic_score_gemma":0.005495127,"teacher_disagreement_score":0.007039286,"about_ca_system_score_codex":0.0012459316,"about_ca_system_score_gemma":0.00097121886,"threshold_uncertainty_score":0.01434803},"labels":[],"label_agreement":null},{"id":"W4387487284","doi":"10.1109/sege59172.2023.10274534","title":"OpenATE: A Distributed Co-simulation Engine for Transactive Energy Systems","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Science and Engineering Research Council; Université du Québec à Trois-Rivières","keywords":"News aggregator; Computer science; Distributed computing; Orchestration; Scalability; Modular design; Grid; Overhead (engineering); Process (computing); Software engineering; Operating system","score_opus":0.017153071616318027,"score_gpt":0.24249413697884714,"score_spread":0.22534106536252912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387487284","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011240696,0.00008142904,0.9607634,0.00010297561,0.000086425694,0.00018457412,0.00047021516,0.019034352,0.008035865],"genre_scores_gemma":[0.40655997,0.00046076864,0.5682964,0.00021499528,0.00005441038,0.0010331846,0.0027481446,0.006556342,0.014075787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941015,0.00017425034,0.0000504547,0.00009296444,0.00021413522,0.000058117326],"domain_scores_gemma":[0.99897456,0.00048139843,0.000059133166,0.00021119244,0.00017948386,0.00009416446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015921254,0.0009983977,0.0008242206,0.00069885055,0.00061370345,0.0016028495,0.0023455683,0.001141999,0.011148429],"category_scores_gemma":[0.0028560166,0.00059689145,0.0010727599,0.0004933573,0.0006992289,0.0018874004,0.0022834723,0.0017326386,0.0019549178],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005559016,0.00035016437,0.0038300813,0.0004113131,0.00022865323,0.00033423642,0.0004988995,0.84290296,0.012852004,0.05217509,0.0108363,0.07502448],"study_design_scores_gemma":[0.000070414906,0.000031452353,0.000118738455,0.000012964413,0.000014843785,0.000043205644,0.000015670523,0.9776638,0.0035020981,0.005416593,0.013093544,0.000016609893],"about_ca_topic_score_codex":0.0036249491,"about_ca_topic_score_gemma":0.0035527202,"teacher_disagreement_score":0.011148429,"about_ca_system_score_codex":0.00071169005,"about_ca_system_score_gemma":0.0011787686,"threshold_uncertainty_score":0.037295163},"labels":[],"label_agreement":null},{"id":"W4387666070","doi":"10.21203/rs.3.rs-3422677/v1","title":"The Value of Long-Duration Energy Storage under Various Grid Conditions in a Zero-Emissions Future","year":2023,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"University of Toronto; California Energy Commission","keywords":"Energy storage; Environmental economics; Grid; Pumped-storage hydroelectricity; Capital cost; Environmental science; Hydropower; Electricity; Distributed generation; Natural resource economics; Renewable energy; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.03618705528711031,"score_gpt":0.3321706312145829,"score_spread":0.2959835759274726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387666070","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9083523,0.005233997,0.032208327,0.005584099,0.00043217657,0.00002137663,0.0016302585,0.00020354458,0.046334002],"genre_scores_gemma":[0.9970806,0.00032271165,0.00079169543,0.000033888577,0.000038146674,0.0000030773015,0.00013251058,0.000013094724,0.0015841777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999788,0.000056766563,0.000008314764,0.00005191849,0.00005119953,0.000043698867],"domain_scores_gemma":[0.9988463,0.00058155815,0.000092775634,0.000107841995,0.00027470273,0.0000968257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010581445,0.0003213339,0.00043182325,0.0003167339,0.00049547903,0.0016614516,0.0006481975,0.0011705038,0.007309968],"category_scores_gemma":[0.0026632447,0.00012483583,0.0003176517,0.0004486666,0.0006684019,0.0035674823,0.00050780113,0.0005151061,0.0003683873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0092607755,0.00029393187,0.02604674,0.00070963986,0.00026946663,0.0012387853,0.00024420407,0.502689,0.03329352,0.26959237,0.0059699886,0.15039147],"study_design_scores_gemma":[0.00019175913,0.0010197103,0.038408253,0.00027658246,0.0005793745,0.000558132,0.0014909703,0.55373245,0.04841947,0.3343386,0.020801479,0.00018320256],"about_ca_topic_score_codex":0.0017929162,"about_ca_topic_score_gemma":0.0028045787,"teacher_disagreement_score":0.007309968,"about_ca_system_score_codex":0.0010759266,"about_ca_system_score_gemma":0.0006136283,"threshold_uncertainty_score":0.024454296},"labels":[],"label_agreement":null},{"id":"W4387789936","doi":"10.1109/tce.2023.3325941","title":"Energy Consumption Prediction Model for Smart Homes via Decentralized Federated Learning With LSTM","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Consumer Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Computer science; Energy consumption; Edge device; Enhanced Data Rates for GSM Evolution; Process (computing); Smart grid; Edge computing; Data modeling; The Internet; Demand response; Distributed computing; Efficient energy use; Big data; Adaptation (eye); Pace; Machine learning; Artificial intelligence; Data mining; Electricity; Cloud computing; Database; Engineering","score_opus":0.012450588695021851,"score_gpt":0.21366165545232035,"score_spread":0.2012110667572985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387789936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.118778616,0.00018767876,0.8753899,0.00051107013,0.00007563796,0.000050359515,0.00020171932,0.0018445867,0.0029604412],"genre_scores_gemma":[0.96332896,0.000048302572,0.033809848,0.000086559274,0.000021639424,0.000075557255,0.00018096261,0.000027774788,0.0024203826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997993,0.00004332862,0.000010447984,0.000075350275,0.00003560602,0.00003595345],"domain_scores_gemma":[0.9997199,0.00011884766,0.000034141536,0.000031270632,0.0000808314,0.000015054437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068796624,0.00043406597,0.0006115743,0.00023739546,0.00032598266,0.0005050645,0.0008044131,0.00084480457,0.0019607681],"category_scores_gemma":[0.0011054224,0.000282747,0.0003981427,0.00031862105,0.0003563163,0.000931285,0.00051416643,0.0010654284,0.0003705743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014523923,0.00007332146,0.0007299366,0.000024744166,0.000024930816,0.00005261867,0.00003766028,0.9550401,0.0018860938,0.0018776166,0.00086318527,0.03924466],"study_design_scores_gemma":[0.0000025409474,0.000005981529,0.000048316277,7.645849e-7,0.0000014510449,0.0000024275853,0.0000018776446,0.99902415,0.00022612483,0.0006387086,0.000046547982,0.0000010132042],"about_ca_topic_score_codex":0.007894748,"about_ca_topic_score_gemma":0.009278453,"teacher_disagreement_score":0.007894748,"about_ca_system_score_codex":0.00074540963,"about_ca_system_score_gemma":0.0009134088,"threshold_uncertainty_score":0.015697598},"labels":[],"label_agreement":null},{"id":"W4387934868","doi":"10.1109/tia.2023.3327320","title":"Risk Analysis of Transactive Energy Retail Markets","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Negotiation; Risk management; Risk analysis (engineering); Grid; Business; Electricity; Environmental economics; Smart grid; Computer science; Industrial organization; Finance; Knowledge management; Economics; Engineering","score_opus":0.012856382584922992,"score_gpt":0.22024274311883948,"score_spread":0.2073863605339165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387934868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32003346,0.001030726,0.6346624,0.0015677301,0.00006926943,0.00019724501,0.00020875885,0.0001690255,0.042061433],"genre_scores_gemma":[0.98454607,0.00030087103,0.009016805,0.00003477157,0.000027659697,0.00007241014,0.000055540808,0.000021403579,0.005924494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976546,0.001240682,0.00009976582,0.0002737647,0.0004830347,0.00024814985],"domain_scores_gemma":[0.9927275,0.0049546533,0.00089782954,0.00031830443,0.0006732647,0.00042841386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004659447,0.00084275793,0.0008228167,0.0011025266,0.00063537987,0.0031459238,0.0012459619,0.0015660282,0.0049151354],"category_scores_gemma":[0.011492462,0.00043025595,0.0010611012,0.0005981307,0.0019898138,0.0037538707,0.002126109,0.0016546943,0.00027188179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018328842,0.00007216003,0.0023856647,0.000062446554,0.000069669884,0.0005187845,0.00032278104,0.6379882,0.0011815602,0.3472976,0.00082578446,0.00909202],"study_design_scores_gemma":[0.00001132885,0.000049488564,0.0004448537,0.000012653429,0.000014359012,0.00007730796,0.00015207134,0.90073365,0.00022284842,0.09751799,0.0007428947,0.00002060733],"about_ca_topic_score_codex":0.0023927984,"about_ca_topic_score_gemma":0.0007959237,"teacher_disagreement_score":0.0049151354,"about_ca_system_score_codex":0.0014420246,"about_ca_system_score_gemma":0.00088093313,"threshold_uncertainty_score":0.024641812},"labels":[],"label_agreement":null},{"id":"W4387993499","doi":"10.1016/j.ijepes.2023.109577","title":"Stackelberg–Nash game approach for price-based demand response in retail electricity trading","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China; Natural Science Foundation of Anhui Province; State Key Laboratory Of Alternate Electrical Power System With Renewable Energy Sources; University of Science and Technology of China; National Natural Science Foundation of China","keywords":"Stackelberg competition; Nash equilibrium; Computer science; Best response; Demand response; Scalability; Electricity; Game theory; Mathematical optimization; Microeconomics; Economics; Mathematics; Engineering","score_opus":0.015513021650932796,"score_gpt":0.2337088559305594,"score_spread":0.2181958342796266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387993499","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013644844,0.00014396901,0.98233336,0.00015517537,0.000045679335,0.00007976622,0.000027657026,0.00008171415,0.0034879867],"genre_scores_gemma":[0.8855632,0.0003339843,0.109488726,0.00013842229,0.000056102446,0.0002190542,0.00006429687,0.00004698124,0.0040892605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876815,0.0005381666,0.000050728417,0.0002174433,0.0002521877,0.00017336573],"domain_scores_gemma":[0.99869967,0.00086760405,0.000108200606,0.00004137913,0.00021469864,0.00006840807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017643026,0.0013264765,0.0016654966,0.0006525947,0.0006844439,0.0015507643,0.002092886,0.001688842,0.0026725384],"category_scores_gemma":[0.0036623687,0.00049231254,0.00086245534,0.0007297561,0.0012274337,0.0020300276,0.0011742758,0.0016448082,0.00030928547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059475195,0.00004931349,0.00034592577,0.000053379255,0.000040748768,0.00012115063,0.00007414708,0.95989907,0.0010954363,0.029236455,0.000473983,0.008550828],"study_design_scores_gemma":[0.000008200764,0.000017386254,0.00002569666,0.0000017664753,0.000005240666,0.000009436196,0.000010908475,0.99380374,0.00015020919,0.0058046994,0.00015857417,0.000004129148],"about_ca_topic_score_codex":0.008157197,"about_ca_topic_score_gemma":0.0062482837,"teacher_disagreement_score":0.008157197,"about_ca_system_score_codex":0.0013700656,"about_ca_system_score_gemma":0.0018968777,"threshold_uncertainty_score":0.016219437},"labels":[],"label_agreement":null},{"id":"W4388048661","doi":"10.3390/su152115479","title":"Application of Internet of Things in Residential Distribution Systems","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Al-Imam Muhammad Ibn Saud Islamic University","keywords":"Internet of Things; Computer science; Profitability index; Profit (economics); Energy conservation; Distribution management system; Peak demand; Reliability engineering; Electricity; Engineering; Computer security; Electrical engineering; Business","score_opus":0.003987077889118149,"score_gpt":0.21715052888114636,"score_spread":0.21316345099202821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388048661","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13534594,0.00091462175,0.8039709,0.0008350033,0.00013130839,0.00008821701,0.00010084917,0.00051527505,0.058097936],"genre_scores_gemma":[0.96289706,0.00070324907,0.033029974,0.00006254095,0.00003619372,0.0000251792,0.000038676008,0.000015438396,0.0031917356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981636,0.00007373947,0.000007418373,0.000020676673,0.00006202472,0.000019873281],"domain_scores_gemma":[0.99991405,0.000034518547,0.000014701462,0.000011706136,0.000020793845,0.0000043723576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017243388,0.00018166337,0.00014431903,0.00023342633,0.0002316705,0.0004186061,0.0003261443,0.00034181066,0.0010219169],"category_scores_gemma":[0.0002868527,0.0001282857,0.00026049695,0.00040986313,0.00031505158,0.000627945,0.00037336684,0.00021193488,0.0001515246],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063735424,0.00009961226,0.005200444,0.00021014677,0.00006082228,0.0015851476,0.00018925413,0.7069418,0.020262111,0.13116813,0.0036363075,0.13058259],"study_design_scores_gemma":[0.000009674028,0.0000903059,0.0027176063,0.000033405056,0.000017270588,0.00049397995,0.00021984457,0.9365618,0.0052737165,0.03898551,0.015574841,0.000022042977],"about_ca_topic_score_codex":0.0012933292,"about_ca_topic_score_gemma":0.0019411212,"teacher_disagreement_score":0.0012933292,"about_ca_system_score_codex":0.0004006386,"about_ca_system_score_gemma":0.0002350838,"threshold_uncertainty_score":0.003418684},"labels":[],"label_agreement":null},{"id":"W4388180756","doi":"10.20517/jsegc.2023.20","title":"Optimal operation and energy management of microgrids","year":2023,"lang":"en","type":"article","venue":"Journal of Smart Environments and Green Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Energy (signal processing); Energy management; Computer science; Business; Mathematics","score_opus":0.0065480033258380815,"score_gpt":0.1863472037800729,"score_spread":0.17979920045423484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388180756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29256788,0.0016629902,0.67768425,0.0012550813,0.00024159413,0.00013145231,0.00036307683,0.00039555755,0.025698224],"genre_scores_gemma":[0.9917779,0.00018964465,0.0066024223,0.000017595226,0.000021145992,0.000014159401,0.000032592332,0.000017374356,0.0013270985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965227,0.00013633126,0.000017694685,0.00005648131,0.000064638356,0.00007271077],"domain_scores_gemma":[0.9996898,0.0001382605,0.000050808605,0.000025432555,0.000071483446,0.000024239738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005557082,0.00053985516,0.00084327813,0.00040595015,0.00044108406,0.0013498815,0.00060425885,0.00043005645,0.0020150621],"category_scores_gemma":[0.0015592856,0.00037487713,0.0002985351,0.00048428486,0.00047461488,0.00110144,0.00057411817,0.00045010055,0.00021148934],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013933395,0.000044243745,0.00051745103,0.000045180786,0.000027425624,0.000038693117,0.00003896187,0.9648677,0.0017138353,0.012546989,0.0009514576,0.01906883],"study_design_scores_gemma":[0.000010307985,0.00003959988,0.00031134323,0.0000055258292,0.000008957817,0.000011287838,0.000043117507,0.98627067,0.00047810483,0.012363268,0.00045238115,0.0000054083557],"about_ca_topic_score_codex":0.0042646467,"about_ca_topic_score_gemma":0.004945024,"teacher_disagreement_score":0.0042646467,"about_ca_system_score_codex":0.00074662996,"about_ca_system_score_gemma":0.00078631827,"threshold_uncertainty_score":0.008479655},"labels":[],"label_agreement":null},{"id":"W4388207251","doi":"10.1109/ccece58730.2023.10289097","title":"Multi-Timescale Stochastic Electrical and Thermal Energy Management for Sustainable Communities with Wastewater Treatment Plants","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Thermal; Wastewater; Thermal management of electronic devices and systems; Thermal energy; Environmental science; Energy management; Sewage treatment; Energy (signal processing); Computer science; Environmental engineering; Engineering; Mechanical engineering; Meteorology; Physics; Thermodynamics","score_opus":0.011458310621154998,"score_gpt":0.19889554462186348,"score_spread":0.1874372340007085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388207251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62522775,0.00025027382,0.37027073,0.0005340379,0.00003655807,0.000085272215,0.00011689504,0.00016094313,0.003317688],"genre_scores_gemma":[0.9975777,0.000031349602,0.0020433886,0.000008652878,0.0000036633419,0.000013434907,0.000013874138,0.00000369387,0.00030430127],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961287,0.00013608013,0.000014829094,0.00007010867,0.00007211017,0.00009415125],"domain_scores_gemma":[0.99926907,0.00039708405,0.0001595416,0.00002458023,0.000080463295,0.000069364825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007883027,0.0005226471,0.00068869826,0.00023875605,0.0004941092,0.00074959395,0.00068899343,0.0006840719,0.0008384695],"category_scores_gemma":[0.0014554559,0.00031016782,0.00052693795,0.0003038212,0.0005431843,0.0007280504,0.0008358995,0.00052393274,0.00005723877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040978837,0.000023226576,0.00053227606,0.0000080423215,0.000011398614,0.000049754068,0.0000075598914,0.99539524,0.00077186123,0.0012955016,0.00006500972,0.0017991483],"study_design_scores_gemma":[0.000003844312,0.000012434645,0.00014815066,4.807697e-7,0.0000020523828,0.0000033537046,0.0000059883487,0.999164,0.00009172262,0.0005421302,0.000024181287,0.0000016404834],"about_ca_topic_score_codex":0.011745541,"about_ca_topic_score_gemma":0.011553079,"teacher_disagreement_score":0.011745541,"about_ca_system_score_codex":0.0012951776,"about_ca_system_score_gemma":0.0010215334,"threshold_uncertainty_score":0.023354352},"labels":[],"label_agreement":null},{"id":"W4388239694","doi":"10.2139/ssrn.4621261","title":"Novel Building-to-Grid Linked Model Framework to Optimize Demand-Response Scheduling with a Case Study of Regina, Saskatchewan","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Grid; Scheduling (production processes); Computer science; Distributed computing; Operations research; Demand response; Industrial engineering; Operations management; Economics; Geography; Engineering; Electrical engineering","score_opus":0.01969543951577039,"score_gpt":0.26082947020370645,"score_spread":0.24113403068793607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388239694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19722365,0.0003825013,0.74451655,0.0011760653,0.0001167566,0.0002726831,0.0021518492,0.002169019,0.051990967],"genre_scores_gemma":[0.86971825,0.00020503669,0.119643934,0.0001164854,0.00001794715,0.0001810872,0.0010206507,0.00028051774,0.008816245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996855,0.0001384396,0.000009804464,0.000044839355,0.000053317566,0.00006817034],"domain_scores_gemma":[0.99967396,0.00013821993,0.000024611913,0.00003991043,0.00007937939,0.00004384018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007108776,0.00088411174,0.0008914299,0.00070188777,0.00085722207,0.002256359,0.0018376032,0.0014451941,0.005315552],"category_scores_gemma":[0.0011397299,0.0006148249,0.0009251046,0.0013278692,0.00048730173,0.0010632966,0.0013474065,0.0011414699,0.0004170165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013641485,0.000019959265,0.0002365406,0.0000096908325,0.000011781078,0.000053800253,0.000015593958,0.9922978,0.00022135378,0.0046341056,0.00038160867,0.0021041078],"study_design_scores_gemma":[0.000005181328,0.0000040901737,0.00005977945,0.0000019072552,0.000005005243,0.0000036710474,0.000018376553,0.99756753,0.0000606496,0.0018793998,0.00039232918,0.0000021588921],"about_ca_topic_score_codex":0.10149018,"about_ca_topic_score_gemma":0.13969739,"teacher_disagreement_score":0.8985098,"about_ca_system_score_codex":0.0024842008,"about_ca_system_score_gemma":0.0038404034,"threshold_uncertainty_score":0.20179886},"labels":[],"label_agreement":null},{"id":"W4388283479","doi":"10.1016/j.enbuild.2023.113707","title":"Development of prediction models for thermostat override behavior in direct load control events","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Carleton University; Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Thermostat; Control (management); Cluster analysis; Thermal comfort; Computer science; Simulation; Engineering; Machine learning; Artificial intelligence; Mechanical engineering","score_opus":0.011164271844103294,"score_gpt":0.20700146318094628,"score_spread":0.195837191336843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388283479","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20135209,0.00024857864,0.7878932,0.00036489038,0.0001375657,0.00014427282,0.0010198812,0.002143666,0.0066958675],"genre_scores_gemma":[0.9653485,0.00013764283,0.030328779,0.00003916604,0.00002492096,0.00012342332,0.0007216561,0.00008970917,0.003186128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998398,0.00002420609,0.000011174773,0.000048628848,0.00004465695,0.00003143975],"domain_scores_gemma":[0.9992901,0.00033250914,0.00006891888,0.00004373425,0.00023237088,0.000032207903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061118795,0.0007058396,0.0006574841,0.00037218328,0.00034033068,0.00071053795,0.0010004382,0.0005847513,0.0019717594],"category_scores_gemma":[0.0019185917,0.000577514,0.00052852544,0.00033143657,0.00020931492,0.0006846609,0.0003787659,0.0010656193,0.00048523952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014707814,0.00003340539,0.0010270713,0.000010471629,0.000009494404,0.000015205678,0.000009923288,0.99137235,0.00041274432,0.0006198056,0.00029802765,0.0061768196],"study_design_scores_gemma":[8.056068e-7,0.000002467478,0.00007921494,5.606674e-7,0.0000010690239,7.9784166e-7,7.7585946e-7,0.99966204,0.00012472377,0.0000967824,0.000029929111,7.592771e-7],"about_ca_topic_score_codex":0.04515915,"about_ca_topic_score_gemma":0.031186672,"teacher_disagreement_score":0.04515915,"about_ca_system_score_codex":0.0008118892,"about_ca_system_score_gemma":0.0014650878,"threshold_uncertainty_score":0.08979261},"labels":[],"label_agreement":null},{"id":"W4388327937","doi":"10.1145/3600100.3626257","title":"CityLearn v2: An OpenAI Gym environment for demand response control benchmarking in grid-interactive communities","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Benchmarking; Flexibility (engineering); Computer science; Grid; Demand response; Distributed computing; Control (management); Virtual power plant; Distributed generation; Electricity; Engineering; Renewable energy","score_opus":0.01573724151200438,"score_gpt":0.23153771224360054,"score_spread":0.21580047073159617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388327937","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031743333,0.00044645384,0.40902638,0.00088856334,0.00079382246,0.0012249441,0.05614352,0.4513148,0.04841821],"genre_scores_gemma":[0.3307386,0.0005429565,0.35557148,0.0011239093,0.00014576508,0.0028965485,0.17360723,0.11270162,0.022671888],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99686134,0.0010823468,0.00018600104,0.00051564444,0.001010591,0.0003441026],"domain_scores_gemma":[0.99528354,0.0017908686,0.0001835403,0.0013349829,0.0008564677,0.00055057707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005556479,0.001783191,0.0012924236,0.0012200739,0.0009990128,0.0023957815,0.005398588,0.0018131481,0.034351166],"category_scores_gemma":[0.009646942,0.001178383,0.0016734377,0.001561454,0.0009266854,0.0034016988,0.0056820344,0.0029935802,0.011264167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0040125772,0.0021217,0.008236891,0.0019080157,0.00045634207,0.00089210493,0.0014076924,0.24840745,0.012375833,0.036548194,0.56271845,0.12091473],"study_design_scores_gemma":[0.0016517205,0.0006372357,0.0045216093,0.00029063335,0.00007105377,0.00019048988,0.0003397135,0.63819706,0.01839585,0.0383268,0.29699105,0.0003868607],"about_ca_topic_score_codex":0.009820346,"about_ca_topic_score_gemma":0.016790228,"teacher_disagreement_score":0.034351166,"about_ca_system_score_codex":0.0010929253,"about_ca_system_score_gemma":0.0018518196,"threshold_uncertainty_score":0.114916086},"labels":[],"label_agreement":null},{"id":"W4388561794","doi":"10.1109/etcm58927.2023.10308985","title":"On the Impacts of Multi-Agent Transactive Energy in Distribution Networks - Part 2: Integrated ETSim Results and Findings","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mitacs","keywords":"Distributed generation; Transactive memory; Computer science; Renewable energy; Grid; Distributed computing; Tariff; Electricity; Risk analysis (engineering); Environmental economics; Reliability engineering; Business; Engineering; Knowledge management","score_opus":0.013756464631511912,"score_gpt":0.20775844013569064,"score_spread":0.19400197550417872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388561794","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8746295,0.00041581356,0.08954974,0.00029213147,0.00005462064,0.00011996405,0.00039323597,0.00034538264,0.034199636],"genre_scores_gemma":[0.995471,0.00006344734,0.003615957,0.000016048856,0.0000028971165,0.000018258968,0.000089294546,0.000016276112,0.0007069394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961495,0.00017775658,0.000014774411,0.00003677847,0.00009604862,0.000059688125],"domain_scores_gemma":[0.9986777,0.00082022423,0.000098734374,0.00013696856,0.00022392163,0.00004252965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012573207,0.000587648,0.00053565926,0.0005023408,0.00021701676,0.00087150594,0.000541294,0.0004266347,0.002329413],"category_scores_gemma":[0.0023038501,0.00013227575,0.0005741436,0.00034208383,0.00042928418,0.00091666996,0.0006212051,0.0005093837,0.00015464771],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009975279,0.00007692839,0.0015227327,0.000045587214,0.000024954803,0.000085327796,0.0000245592,0.9895397,0.0010860065,0.003196828,0.0001813392,0.0041163005],"study_design_scores_gemma":[0.0000092737955,0.00008810479,0.00064030883,0.0000057343973,0.000011371803,0.000017285527,0.000037525075,0.9967182,0.0013855173,0.0008703484,0.00021228142,0.0000039777874],"about_ca_topic_score_codex":0.006773045,"about_ca_topic_score_gemma":0.0032292628,"teacher_disagreement_score":0.006773045,"about_ca_system_score_codex":0.00060396176,"about_ca_system_score_gemma":0.00038730755,"threshold_uncertainty_score":0.013467252},"labels":[],"label_agreement":null},{"id":"W4388562058","doi":"10.1109/etcm58927.2023.10309090","title":"On the Impacts of Multi-Agent Transactive Energy in Distribution Networks - Part 1: GTSPF Construction and ETSim Integration","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mitacs","keywords":"Python (programming language); Distributed generation; Computer science; Distributed computing; Grid; Transactive memory; Electricity; Solver; Systems engineering; Renewable energy; Engineering; Operating system; Knowledge management","score_opus":0.011619456959814242,"score_gpt":0.20210075001276853,"score_spread":0.1904812930529543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388562058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.295909,0.0001875771,0.6788193,0.0003638362,0.00009739301,0.0001919609,0.0002986115,0.00082415715,0.023308218],"genre_scores_gemma":[0.9406912,0.000116127485,0.056436487,0.000034000983,0.0000108135155,0.00010370135,0.00015263956,0.0001012881,0.0023537874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969435,0.00013942354,0.000010968309,0.000036148558,0.00008366884,0.000035480058],"domain_scores_gemma":[0.99945885,0.000288137,0.0000468268,0.00008607019,0.00008905814,0.00003107828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087897823,0.0005099212,0.0003774434,0.0003900359,0.0003522856,0.00090670784,0.0006731514,0.00058331934,0.0028600132],"category_scores_gemma":[0.001806988,0.0002084454,0.00053453055,0.0003099068,0.0005577001,0.0009064578,0.0009869349,0.0006398811,0.00020849488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033113836,0.000031346048,0.001012445,0.000033885983,0.000013589735,0.000073714415,0.00003967927,0.97890544,0.0014616475,0.0080291135,0.00021070056,0.010155312],"study_design_scores_gemma":[0.000004158324,0.00002045345,0.00017458988,0.000005045079,0.000003757073,0.000012194435,0.000014735692,0.9967253,0.0008823727,0.0015061236,0.00064876635,0.0000024570031],"about_ca_topic_score_codex":0.004902511,"about_ca_topic_score_gemma":0.0030911388,"teacher_disagreement_score":0.004902511,"about_ca_system_score_codex":0.0005518353,"about_ca_system_score_gemma":0.00064827065,"threshold_uncertainty_score":0.009747922},"labels":[],"label_agreement":null},{"id":"W4388570960","doi":"10.1016/j.enbuild.2023.113722","title":"Multi-stage optimization for energy management and trading for smart homes considering operational constraints of a distribution network","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Distributed generation; News aggregator; Energy management; Energy management system; Computer science; Reliability engineering; Integer programming; Smart grid; Operations research; Engineering; Energy (signal processing); Renewable energy; Electrical engineering","score_opus":0.018637406592740827,"score_gpt":0.22443773612093953,"score_spread":0.2058003295281987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388570960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08604027,0.0008349015,0.89917946,0.0007475313,0.00020490681,0.00025207334,0.00036764442,0.0002753901,0.012097698],"genre_scores_gemma":[0.9430938,0.0002807085,0.046767358,0.00014132043,0.00008030638,0.00032555833,0.00023209317,0.00011638569,0.008962427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989555,0.0004801648,0.000030714356,0.0001444616,0.0001555524,0.00023360335],"domain_scores_gemma":[0.99780625,0.0017055332,0.00013000447,0.000051442752,0.000203058,0.000103730876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026001995,0.0019401532,0.003620294,0.00087362493,0.0009127877,0.002631475,0.0019808656,0.0032953357,0.006557735],"category_scores_gemma":[0.003943874,0.0023056373,0.0018967857,0.00117639,0.0014031797,0.0021909925,0.0017301175,0.0022060364,0.0003820121],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050577994,0.000029112995,0.0001239035,0.000028641913,0.000025481813,0.000041011568,0.0000126553805,0.9964887,0.0002022242,0.001352166,0.00022835334,0.0014171335],"study_design_scores_gemma":[0.0000067985593,0.000013728872,0.000044835764,0.0000020358268,0.0000049938567,0.0000024548472,0.0000043418263,0.9993938,0.00005213176,0.00042740643,0.000045069664,0.0000023695688],"about_ca_topic_score_codex":0.016494246,"about_ca_topic_score_gemma":0.016593784,"teacher_disagreement_score":0.016494246,"about_ca_system_score_codex":0.0017907668,"about_ca_system_score_gemma":0.0020989028,"threshold_uncertainty_score":0.032796502},"labels":[],"label_agreement":null},{"id":"W4388579551","doi":"10.1109/tsg.2023.3331714","title":"A Decentralised Transactive Energy Market Considering Physical System Constraints","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Prosumer; Computer science; Database transaction; Distributed generation; Energy market; Network congestion; Electric power system; Demand response; Game theory; Distributed computing; Risk analysis (engineering); Electricity; Business; Microeconomics; Computer network; Economics; Power (physics); Engineering","score_opus":0.011405117686516473,"score_gpt":0.20237740005892266,"score_spread":0.19097228237240618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388579551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04473996,0.00019895997,0.94165075,0.00034311417,0.000074803706,0.00011573358,0.00006455079,0.00022712171,0.012585005],"genre_scores_gemma":[0.9311487,0.00017036944,0.058508452,0.0000906557,0.000043690732,0.00011712759,0.00004610803,0.00004065994,0.009834199],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990306,0.00031807733,0.000046308298,0.00024627632,0.00023862363,0.00012004564],"domain_scores_gemma":[0.99894625,0.00042214518,0.0001414256,0.00017696402,0.00019795116,0.0001152265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013204191,0.00064658,0.0012637561,0.0003679105,0.0005641731,0.0021556232,0.0023723554,0.0014370381,0.0053526713],"category_scores_gemma":[0.0017890715,0.00046500866,0.00064394914,0.0005755205,0.00094150886,0.002663504,0.0022316023,0.0015225463,0.0005482414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002373663,0.00016896153,0.0003228021,0.00012382503,0.00006360868,0.00042084753,0.00014334192,0.9093278,0.008485587,0.05106719,0.001206652,0.028432118],"study_design_scores_gemma":[0.000024793062,0.00006307235,0.000077192206,0.0000037889242,0.000009018269,0.00007062597,0.000035760146,0.9900917,0.00070421,0.008050293,0.0008600883,0.000009606985],"about_ca_topic_score_codex":0.0014648484,"about_ca_topic_score_gemma":0.0021666186,"teacher_disagreement_score":0.0053526713,"about_ca_system_score_codex":0.0007355963,"about_ca_system_score_gemma":0.001051058,"threshold_uncertainty_score":0.017906487},"labels":[],"label_agreement":null},{"id":"W4388723264","doi":"10.1016/j.energy.2023.129673","title":"Demand response programs: Comparing price signals and direct load control","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Flexibility (engineering); Electrification; Environmental economics; Renewable energy; Electric power system; Load management; Peak demand; Supply network; Variable renewable energy; Base load power plant; Demand management; Supply and demand; Economics; Computer science; Electricity; Engineering; Power (physics); Distributed generation; Microeconomics; Electrical engineering","score_opus":0.011695708372070734,"score_gpt":0.2030261206936975,"score_spread":0.19133041232162676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388723264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9651973,0.0002966075,0.015750501,0.00048404105,0.0001727984,0.00034480737,0.0004489932,0.0004949929,0.016809996],"genre_scores_gemma":[0.99525565,0.00008136901,0.0027266229,0.00013697677,0.000027457132,0.000089779904,0.00019083616,0.00004919885,0.0014421593],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9962692,0.0023342185,0.00010886293,0.00030962814,0.0006871071,0.00029097413],"domain_scores_gemma":[0.9759896,0.020405952,0.0008978199,0.00087778247,0.0013453518,0.00048351512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004317696,0.0005578357,0.0007316717,0.0009163006,0.0003078094,0.0012709403,0.0015581775,0.0008732075,0.0067422683],"category_scores_gemma":[0.019350976,0.0002542548,0.00040961296,0.00080501474,0.0005402314,0.0020624844,0.00090458983,0.000999048,0.0006730594],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.1376299,0.033516992,0.050320055,0.0015916639,0.0011328158,0.00021532779,0.0006459917,0.26836953,0.012261346,0.017104149,0.0071349214,0.47007728],"study_design_scores_gemma":[0.010255175,0.048439175,0.04856413,0.00011379814,0.0012715154,0.00015092922,0.0013529744,0.8450642,0.027979862,0.011212948,0.0054548015,0.00014037541],"about_ca_topic_score_codex":0.004633697,"about_ca_topic_score_gemma":0.0037506765,"teacher_disagreement_score":0.0067422683,"about_ca_system_score_codex":0.0011375676,"about_ca_system_score_gemma":0.00097485475,"threshold_uncertainty_score":0.02283448},"labels":[],"label_agreement":null},{"id":"W4388766963","doi":"10.1016/j.enbuild.2023.113750","title":"Enhancing energy flexibility of building clusters via supervisory room temperature control: Quantification and evaluation of benefits","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; École de Technologie Supérieure; Natural Resources Canada","funders":"Office of Energy Research and Development; Natural Resources Canada","keywords":"Flexibility (engineering); Grid; Incentive; Electrification; Work (physics); Context (archaeology); Efficient energy use; Renewable energy; Computer science; Smart grid; Architectural engineering; Electricity; Simulation; Environmental economics; Engineering; Economics; Mechanical engineering; Electrical engineering","score_opus":0.02126555775455837,"score_gpt":0.23295134406955606,"score_spread":0.21168578631499768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388766963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96283937,0.00012682186,0.03368971,0.00005270301,0.000019392033,0.000032363685,0.00008346947,0.00024788614,0.0029082394],"genre_scores_gemma":[0.999,0.000011552809,0.0008752633,0.0000017056636,0.0000012524326,0.000002974001,0.000010652156,0.0000034409773,0.00009313158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99968386,0.000086341,0.000007217346,0.000072439456,0.000081521495,0.000068557165],"domain_scores_gemma":[0.9991642,0.0003808504,0.00008876932,0.00017861235,0.00012222509,0.0000653887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061430945,0.0005892748,0.00038461495,0.00025015956,0.00020306149,0.0005811429,0.00053822796,0.00032793207,0.0011953771],"category_scores_gemma":[0.000997378,0.00013335998,0.00023151684,0.0004414913,0.00036541824,0.0006711227,0.000522993,0.00024965682,0.00013519965],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037468018,0.00069671695,0.013532021,0.00019363301,0.00012355328,0.000087465625,0.00009943087,0.8032149,0.08410052,0.0023045188,0.00034448472,0.091555916],"study_design_scores_gemma":[0.00011259124,0.0026579974,0.026727239,0.000015899417,0.00016787088,0.00007375011,0.00025505412,0.88891536,0.0777177,0.0024917573,0.00082024786,0.0000444912],"about_ca_topic_score_codex":0.0019358634,"about_ca_topic_score_gemma":0.001988428,"teacher_disagreement_score":0.0019358634,"about_ca_system_score_codex":0.0003844929,"about_ca_system_score_gemma":0.00031203727,"threshold_uncertainty_score":0.003998935},"labels":[],"label_agreement":null},{"id":"W4388820405","doi":"10.1109/tia.2023.3334218","title":"A Data-Driven Framework for Quantifying Demand Response Participation Benefit of Industrial Consumers","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Engineering and Physical Sciences Research Council; Science Foundation Ireland","keywords":"Flexibility (engineering); Factory (object-oriented programming); Smart grid; Demand response; Renewable energy; Electricity; Computer science; Electronics; Grid; Incentive; Environmental economics; Industrial engineering; Operations research; Engineering; Electrical engineering; Economics; Mathematics","score_opus":0.1556342422874136,"score_gpt":0.34860859407840217,"score_spread":0.19297435179098857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388820405","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07014249,0.00014451404,0.92001724,0.0005165065,0.000026199286,0.00029730282,0.0025044684,0.0006317064,0.005719592],"genre_scores_gemma":[0.8216666,0.00012535538,0.17481756,0.00008752218,0.00002130902,0.00038778552,0.0016061179,0.000062231724,0.0012254482],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99685127,0.0014816608,0.00017651712,0.0005373043,0.00071019947,0.00024311715],"domain_scores_gemma":[0.99626476,0.0021472678,0.00045285356,0.00043617943,0.0005724316,0.00012656719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004764407,0.0009221524,0.00066303887,0.0018448944,0.00046442528,0.002461392,0.0017073952,0.0014962701,0.0016643798],"category_scores_gemma":[0.007986559,0.00056668284,0.0010243064,0.0015842468,0.0009988772,0.0024062674,0.0014737626,0.0012302856,0.00027674437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054804375,0.000055015356,0.0024819844,0.00003431288,0.000022583814,0.00009442141,0.00006156306,0.94819915,0.00087365805,0.038090132,0.00042287144,0.0096094925],"study_design_scores_gemma":[0.0000043855475,0.000017808636,0.000567146,0.0000062075815,0.000004291063,0.000016372807,0.000030693365,0.9897592,0.00038788677,0.0086222505,0.00057091186,0.00001282286],"about_ca_topic_score_codex":0.017917495,"about_ca_topic_score_gemma":0.010025669,"teacher_disagreement_score":0.017917495,"about_ca_system_score_codex":0.00276466,"about_ca_system_score_gemma":0.0018399206,"threshold_uncertainty_score":0.03562641},"labels":[],"label_agreement":null},{"id":"W4388856320","doi":"10.1109/naps58826.2023.10318626","title":"Enabling Peer-to-Peer Transactions in Measurement-Based Distribution System Market","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constraint (computer-aided design); Peer-to-peer; Computer science; Electricity; Market power; Key (lock); Mathematical optimization; Microeconomics; Distributed computing; Economics; Computer security; Engineering","score_opus":0.02068697924222743,"score_gpt":0.20785175374654657,"score_spread":0.18716477450431915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388856320","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030192368,0.00012358786,0.9652243,0.00019823632,0.000048546648,0.00018310692,0.000065803615,0.0005487723,0.0034152777],"genre_scores_gemma":[0.8838964,0.00009341434,0.1140927,0.00006672094,0.00006821894,0.00020919238,0.00010011062,0.000074111085,0.0013993222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9955877,0.0020568322,0.00019925152,0.00081025227,0.0010659237,0.0002800758],"domain_scores_gemma":[0.9937736,0.0037469706,0.00051788066,0.0009731098,0.0007063268,0.00028212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034314152,0.0008750682,0.0015192565,0.0005305358,0.0009737043,0.0015744616,0.0029568693,0.0015338813,0.0035310055],"category_scores_gemma":[0.011121017,0.00050560327,0.0005235733,0.00088386907,0.0011931759,0.0043220073,0.0026959456,0.0016738574,0.0007953463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004171844,0.0004426989,0.001916528,0.00023749277,0.00009867224,0.0009801344,0.00042776042,0.6771776,0.016858568,0.16313358,0.004116718,0.13419305],"study_design_scores_gemma":[0.000025180849,0.000057080422,0.00012523626,0.0000042551605,0.000005395128,0.000075171614,0.000041558273,0.97137475,0.0018318095,0.02507703,0.0013678944,0.000014617891],"about_ca_topic_score_codex":0.0012399808,"about_ca_topic_score_gemma":0.0013908837,"teacher_disagreement_score":0.0035310055,"about_ca_system_score_codex":0.0007194662,"about_ca_system_score_gemma":0.001158515,"threshold_uncertainty_score":0.01814723},"labels":[],"label_agreement":null},{"id":"W4389035955","doi":"10.36227/techrxiv.24585051.v1","title":"Towards Harmonious Decentralization of Energy Systems: A Vision of Interoperable Peer-to-Peer Energy Markets","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prosumer; Interoperability; Scalability; Decentralization; Computer science; Orchestration; Distributed computing; Distributed generation; Grid; Peer-to-peer; Energy market; Smart grid; Process management; Business; Electricity; Engineering; Renewable energy; Economics; World Wide Web","score_opus":0.01729714056473966,"score_gpt":0.23884319089995928,"score_spread":0.22154605033521962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389035955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077880467,0.00067884737,0.97142214,0.0021868015,0.00014567815,0.000077654855,0.00003030042,0.00040541706,0.017265055],"genre_scores_gemma":[0.5324392,0.0018583763,0.452305,0.0007823202,0.00034880015,0.00027926068,0.000100378216,0.00020471384,0.011682094],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983815,0.00060049765,0.00006142419,0.00029649978,0.00044713824,0.00021291773],"domain_scores_gemma":[0.99913555,0.00021187955,0.00008076612,0.00025922546,0.00014140182,0.00017122272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026175552,0.00056891417,0.00062708976,0.00051298254,0.0010274255,0.004453641,0.0020466177,0.0017979343,0.0028008672],"category_scores_gemma":[0.0025036847,0.0004130416,0.00072342454,0.00076325954,0.0036210471,0.0067363884,0.0038260515,0.0029542178,0.00080226624],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028680524,0.000048757167,0.00013795156,0.00008908386,0.000024171697,0.00011016893,0.0003427436,0.06617446,0.001707417,0.9015907,0.002430818,0.027315103],"study_design_scores_gemma":[0.000030939416,0.00005973018,0.000130919,0.00006166055,0.000018059594,0.00009512877,0.00023207506,0.19615635,0.0017969179,0.74788666,0.053504847,0.000026653188],"about_ca_topic_score_codex":0.0012792642,"about_ca_topic_score_gemma":0.0011490618,"teacher_disagreement_score":0.004453641,"about_ca_system_score_codex":0.0013103131,"about_ca_system_score_gemma":0.0021360382,"threshold_uncertainty_score":0.013843119},"labels":[],"label_agreement":null},{"id":"W4389036032","doi":"10.36227/techrxiv.24585051","title":"Towards Harmonious Decentralization of Energy Systems: A Vision of Interoperable Peer-to-Peer Energy Markets","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prosumer; Interoperability; Scalability; Computer science; Decentralization; Orchestration; Distributed computing; Grid; Distributed generation; Smart grid; Energy market; Peer-to-peer; Process management; Risk analysis (engineering); Business; Electricity; Engineering; Renewable energy; Economics; World Wide Web","score_opus":0.01729714056473966,"score_gpt":0.23884319089995928,"score_spread":0.22154605033521962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389036032","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007856532,0.00065220456,0.96777153,0.0027169127,0.00016525295,0.00009098881,0.0000374846,0.00048416705,0.020224925],"genre_scores_gemma":[0.53769064,0.0016297242,0.44576085,0.00089752016,0.00036113037,0.00026615086,0.00012259267,0.00024469374,0.013026705],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99795496,0.0007590103,0.000074338874,0.00038604214,0.00057298545,0.00025268886],"domain_scores_gemma":[0.9988726,0.00028347803,0.000097410455,0.00033653097,0.00018402342,0.00022597132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030173182,0.0006200818,0.0006710693,0.0005481124,0.0010850303,0.005041203,0.002242693,0.0020567635,0.0033238048],"category_scores_gemma":[0.0032308563,0.00045247108,0.00074214215,0.0008519345,0.00382158,0.0077227275,0.00430356,0.0034189457,0.00089889986],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035649136,0.000059541413,0.000154373,0.000097838485,0.000025180061,0.000119412674,0.00038573713,0.06897976,0.0018485449,0.8917307,0.0032259095,0.03333737],"study_design_scores_gemma":[0.00003053419,0.000057349756,0.00014669415,0.0000599589,0.00001561254,0.00009381409,0.0002748267,0.20324345,0.0017835371,0.7414324,0.052835964,0.000025887499],"about_ca_topic_score_codex":0.0013883872,"about_ca_topic_score_gemma":0.0011752386,"teacher_disagreement_score":0.005041203,"about_ca_system_score_codex":0.0015219947,"about_ca_system_score_gemma":0.002463894,"threshold_uncertainty_score":0.015957296},"labels":[],"label_agreement":null},{"id":"W4389039452","doi":"10.1016/j.apenergy.2023.122359","title":"From buildings to cities: How household demographics shape demand response and energy consumption","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada; Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Occupancy; Consumption (sociology); Energy consumption; Demand response; Thermostat; Nexus (standard); Context (archaeology); Renewable energy; Archetype; Economics; Business; Environmental economics; Electricity; Engineering; Geography; Civil engineering; Sociology","score_opus":0.015784400091867604,"score_gpt":0.19488195196742944,"score_spread":0.17909755187556184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389039452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.982373,0.00037845268,0.0010290875,0.0019958657,0.00003402863,0.0000140340935,0.0010340151,0.000016063123,0.013125395],"genre_scores_gemma":[0.9984987,0.00011312,0.00010854269,0.00013232019,0.000009106491,0.000005111914,0.00024126696,0.000008837609,0.0008829716],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995096,0.00023877084,0.000018820565,0.00007797709,0.000057947767,0.000096885466],"domain_scores_gemma":[0.99820507,0.0006451475,0.0004103387,0.00012576036,0.00030764152,0.00030613513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038137863,0.00011786839,0.00018136136,0.00039662095,0.0004761277,0.0019941118,0.00033036777,0.0005448893,0.00981085],"category_scores_gemma":[0.0032637706,0.00017586962,0.00030725144,0.0010411885,0.00045877098,0.0015961857,0.0010495661,0.0006173271,0.0011492535],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022007852,0.00015652007,0.9596475,0.00007840963,0.00014854805,0.0002007853,0.006401668,0.0017628073,0.0007477366,0.0044793785,0.005529672,0.020626796],"study_design_scores_gemma":[0.0000052196324,0.000044421242,0.9642709,0.000039892377,0.000032013213,0.000090383524,0.022822056,0.0015369295,0.00024237717,0.002378066,0.008515554,0.000022298815],"about_ca_topic_score_codex":0.022536557,"about_ca_topic_score_gemma":0.057501532,"teacher_disagreement_score":0.022536557,"about_ca_system_score_codex":0.00067017996,"about_ca_system_score_gemma":0.00041565837,"threshold_uncertainty_score":0.044810712},"labels":[],"label_agreement":null},{"id":"W4389074848","doi":"10.1007/s10994-023-06460-4","title":"Multi-agent reinforcement learning for fast-timescale demand response of residential loads","year":2023,"lang":"en","type":"article","venue":"Machine Learning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université de Montréal; Polytechnique Montréal; Mila - Quebec Artificial Intelligence Institute","funders":"Natural Sciences and Engineering Research Council of Canada; Samsung; Institut de Valorisation des Données; Microsoft Research","keywords":"Reinforcement learning; Computer science; Demand response; Renewable energy; Distributed computing; Power (physics); Artificial intelligence; Engineering; Electrical engineering; Electricity","score_opus":0.01256083026442792,"score_gpt":0.24168967895844878,"score_spread":0.22912884869402086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389074848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15226796,0.00030908524,0.84295833,0.00053212815,0.000104484294,0.00007951407,0.00008169483,0.00059143035,0.0030753647],"genre_scores_gemma":[0.9890366,0.000028393497,0.009803445,0.000036082605,0.000012280704,0.00003215037,0.000027770173,0.000016646212,0.001006626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996424,0.00014694587,0.000015694119,0.000065630826,0.000059629343,0.0000697512],"domain_scores_gemma":[0.99777204,0.0016225838,0.00018684418,0.00007514974,0.0002432155,0.00010007317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014579972,0.0005963319,0.0009883186,0.00031382882,0.0003637735,0.0005966497,0.0008768711,0.0009386248,0.0016908104],"category_scores_gemma":[0.0046613934,0.0004017588,0.00030127598,0.0002631495,0.00056751847,0.0006291518,0.0008075986,0.0012185171,0.00022753814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050491166,0.00003448262,0.0002425021,0.000014584147,0.0000089015675,0.000025107152,0.000014349691,0.99185175,0.0002813371,0.0009499789,0.00025734524,0.006269122],"study_design_scores_gemma":[0.0000025428824,0.000004303883,0.000020433208,4.420262e-7,5.2221185e-7,0.0000010088058,8.749298e-7,0.9997296,0.00003126503,0.00019359015,0.000014916444,5.218873e-7],"about_ca_topic_score_codex":0.009679208,"about_ca_topic_score_gemma":0.008222916,"teacher_disagreement_score":0.009679208,"about_ca_system_score_codex":0.0008159641,"about_ca_system_score_gemma":0.00083605247,"threshold_uncertainty_score":0.019245744},"labels":[],"label_agreement":null},{"id":"W4389191124","doi":"10.22215/etd/2023-15858","title":"Multi-Agent Reinforcement Learning Based User-Centric Demand Response via Non-Intrusive Load Monitoring","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Demand response; Reinforcement learning; Computer science; Incentive; Scheduling (production processes); Load management; Reinforcement; On demand; Real-time computing; Response time; Electricity; Engineering; Multimedia; Artificial intelligence; Operations management; Operating system","score_opus":0.011109175144258476,"score_gpt":0.24108545791297162,"score_spread":0.22997628276871315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389191124","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060631588,0.00011369516,0.9346373,0.00016150929,0.000037222955,0.00007068885,0.000020944663,0.0005455141,0.0037815531],"genre_scores_gemma":[0.9667295,0.000047973368,0.031195879,0.00004658402,0.000014301408,0.000056268113,0.000018579389,0.000019625562,0.0018712669],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995906,0.00015154216,0.000016220967,0.000094675415,0.00009176816,0.000055201464],"domain_scores_gemma":[0.9994696,0.00025765706,0.000088110464,0.000049029637,0.00009452422,0.000041102645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007185442,0.00049018266,0.00054948573,0.00012816416,0.0002031589,0.0004904834,0.00069015985,0.0004055871,0.0010417581],"category_scores_gemma":[0.0012797017,0.00020387281,0.00027580795,0.00012866939,0.00036201256,0.00045144875,0.0005401392,0.0007743067,0.00019914837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012720423,0.00020935501,0.0009344056,0.000047141526,0.000037551254,0.000071117385,0.00006759702,0.935114,0.006640889,0.004773369,0.00076920365,0.051208153],"study_design_scores_gemma":[0.0000049752725,0.000023852675,0.00007338654,8.834867e-7,0.0000017500764,0.0000050249982,0.0000026147432,0.99886835,0.00044399727,0.0004539201,0.0001197425,0.0000015458177],"about_ca_topic_score_codex":0.0023963056,"about_ca_topic_score_gemma":0.002266246,"teacher_disagreement_score":0.0023963056,"about_ca_system_score_codex":0.00043247294,"about_ca_system_score_gemma":0.0005945995,"threshold_uncertainty_score":0.004764676},"labels":[],"label_agreement":null},{"id":"W4389223831","doi":"10.1088/1742-6596/2600/5/052003","title":"Exploring thermostat override behavior during direct load control events","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Carleton University; Concordia University","funders":"","keywords":"Thermostat; Control (management); Computer science; Cluster analysis; Engineering; Artificial intelligence","score_opus":0.05212069771814409,"score_gpt":0.22560526404845205,"score_spread":0.17348456633030795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389223831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99853384,0.00001579771,0.0008161157,0.000012978667,0.0000020606583,0.000019687735,0.00016403467,0.000027469681,0.00040807517],"genre_scores_gemma":[0.99879164,0.000012908266,0.0008356516,0.000008995023,0.0000015290218,0.00001647243,0.00015327975,0.0000046045247,0.00017489576],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995097,0.00017140056,0.00003198453,0.000112857735,0.00012526129,0.000048923754],"domain_scores_gemma":[0.9974955,0.0013012,0.0004937336,0.00017346974,0.00037027316,0.00016577479],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005706518,0.00020393037,0.0002383105,0.00057566696,0.0002631904,0.0004951212,0.00024549608,0.0003111686,0.0010716706],"category_scores_gemma":[0.003624576,0.00013072255,0.00016638491,0.00042244323,0.0002211478,0.00043126565,0.0003732777,0.00030039318,0.0003029659],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008006532,0.00046061166,0.92106706,0.00019520978,0.000089724024,0.0003557963,0.006658818,0.0029621786,0.019957641,0.00018892813,0.00083904853,0.046424344],"study_design_scores_gemma":[0.000010709744,0.0003884647,0.97696406,0.0000265593,0.000027633374,0.0001616643,0.004022947,0.013525037,0.003530842,0.00015910828,0.0011477306,0.000035307512],"about_ca_topic_score_codex":0.0027008806,"about_ca_topic_score_gemma":0.006256986,"teacher_disagreement_score":0.0027008806,"about_ca_system_score_codex":0.00028985838,"about_ca_system_score_gemma":0.00016475112,"threshold_uncertainty_score":0.0053702593},"labels":[],"label_agreement":null},{"id":"W4389228627","doi":"10.37256/jeee.2220233795","title":"Power Consumption Minimization of a Low-Cost IoT Data Logger for Photovoltaic System","year":2023,"lang":"en","type":"article","venue":"Journal of Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Microcontroller; Computer science; Embedded system; Battery (electricity); Power management; Real-time computing; Power (physics); Photovoltaic system; Sleep mode; Computer hardware; Electrical engineering; Automotive engineering; Engineering; Power consumption; Operating system","score_opus":0.014139744320565372,"score_gpt":0.22293128740862506,"score_spread":0.2087915430880597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389228627","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28738427,0.0008410416,0.6845787,0.0005653308,0.00021265552,0.00041755682,0.0006736905,0.0077069723,0.017619722],"genre_scores_gemma":[0.9263262,0.00015708634,0.06764171,0.00019818184,0.00004072293,0.00015329546,0.0003221873,0.00014837585,0.005012239],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996394,0.00005828342,0.000025677558,0.000060479182,0.00018174695,0.00003447775],"domain_scores_gemma":[0.99969673,0.00009053841,0.000044186672,0.00005875271,0.00009266487,0.000017044189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002012669,0.00042027465,0.00038482583,0.0005551552,0.00033683464,0.0005208513,0.00098896,0.00030654628,0.002851551],"category_scores_gemma":[0.00062083546,0.00021498713,0.00016579941,0.00042402803,0.0001282824,0.00091858214,0.00039628043,0.00030364832,0.0007923786],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010882928,0.00061695103,0.008883061,0.0006219877,0.000059606802,0.0007529543,0.00019612545,0.021468781,0.32141638,0.004340915,0.011509692,0.6290453],"study_design_scores_gemma":[0.00020893845,0.002132512,0.019024046,0.00009841423,0.00017030422,0.002486711,0.00016584003,0.47162473,0.44551688,0.0027902946,0.055674326,0.00010700465],"about_ca_topic_score_codex":0.00028100636,"about_ca_topic_score_gemma":0.0007031594,"teacher_disagreement_score":0.002851551,"about_ca_system_score_codex":0.00031290564,"about_ca_system_score_gemma":0.0003594665,"threshold_uncertainty_score":0.009539366},"labels":[],"label_agreement":null},{"id":"W4389301235","doi":"10.1007/s12273-023-1074-5","title":"A novel non-intrusive load monitoring technique using semi-supervised deep learning framework for smart grid","year":2023,"lang":"en","type":"article","venue":"Building Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Thresholding; Smart grid; Computer science; Artificial intelligence; Deep learning; Energy consumption; Convolutional neural network; Supervised learning; Energy (signal processing); Data mining; Big data; Machine learning; Grid; Artificial neural network; Engineering","score_opus":0.02741511612930098,"score_gpt":0.2914233818112708,"score_spread":0.26400826568196983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389301235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028983975,0.00011628209,0.96576923,0.00010757802,0.000041432286,0.000029684936,0.00010786618,0.00281257,0.0020313645],"genre_scores_gemma":[0.82710326,0.00010410549,0.16691682,0.00015662897,0.000052319338,0.00006817061,0.0005294926,0.00015204486,0.004917073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978024,0.000042698874,0.000010231528,0.000050788683,0.00007876642,0.00003720446],"domain_scores_gemma":[0.99972266,0.00006869622,0.000038203427,0.000055451696,0.00008839608,0.0000265339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030397595,0.00064097886,0.0006751399,0.0003296165,0.00024374499,0.00040418835,0.0011505021,0.00048356163,0.0017460845],"category_scores_gemma":[0.00074168155,0.00034837253,0.00039529265,0.0003794938,0.00023326659,0.00079876836,0.00091089803,0.0010623473,0.000562556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026538564,0.00033749186,0.0027458768,0.00008039316,0.00008404306,0.00010855256,0.000069500806,0.5895691,0.016737467,0.003222287,0.0060923835,0.3806876],"study_design_scores_gemma":[0.0000014566567,0.0000071932154,0.00012306646,8.841914e-7,0.0000015491235,0.0000055147143,0.0000015250454,0.99874073,0.0007007676,0.00026883878,0.00014695495,0.0000014979906],"about_ca_topic_score_codex":0.0062347027,"about_ca_topic_score_gemma":0.012185296,"teacher_disagreement_score":0.0062347027,"about_ca_system_score_codex":0.00031363347,"about_ca_system_score_gemma":0.00061531557,"threshold_uncertainty_score":0.012396812},"labels":[],"label_agreement":null},{"id":"W4389309787","doi":"10.3389/fenrg.2023.1337268","title":"Editorial: Distributed learning, optimization, and control methods for future power grids","year":2023,"lang":"en","type":"editorial","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Control (management); Computer science; Artificial intelligence","score_opus":0.008915160579553345,"score_gpt":0.3174525269278155,"score_spread":0.3085373663482622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389309787","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000061160245,0.018032182,0.0015321285,0.038564708,0.93613976,0.00001644262,0.00012829626,0.0001426815,0.0053826515],"genre_scores_gemma":[0.0010769592,0.010825474,0.00039498275,0.009959094,0.9611493,0.000020013746,0.000060463713,0.00009954456,0.016414126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99792683,0.00030434073,0.0001767713,0.0004361276,0.0010261532,0.00012968916],"domain_scores_gemma":[0.9921617,0.0039840136,0.0003814608,0.00023862693,0.0023267786,0.0009074519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025731237,0.0028080533,0.0026606494,0.0026518637,0.0017749057,0.004854673,0.0028415206,0.0069503253,0.036668334],"category_scores_gemma":[0.009077524,0.00068255136,0.0021111327,0.00141403,0.0020038912,0.0033566232,0.0009873512,0.01103624,0.015548531],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002325298,0.000008436053,0.000014403364,0.00015955126,0.000015223056,0.000035284396,0.00000630303,0.00013219306,0.000043999033,0.0014963396,0.9908976,0.0071674995],"study_design_scores_gemma":[0.000046911246,0.00003387767,0.00014954059,0.00025721834,0.000031037034,0.00012361258,0.000013674677,0.0006290006,0.0000862974,0.004669851,0.9939433,0.000015818126],"about_ca_topic_score_codex":0.0010051237,"about_ca_topic_score_gemma":0.0020170808,"teacher_disagreement_score":0.036668334,"about_ca_system_score_codex":0.0018364243,"about_ca_system_score_gemma":0.0015692435,"threshold_uncertainty_score":0.12266779},"labels":[],"label_agreement":null},{"id":"W4389404242","doi":"10.2139/ssrn.4655989","title":"Assessment of Renewable Power Generation Applied in Homestay Hotels: Energy and Cost-Benefit Considering Dynamic Occupancy Rates and Reservation Prices","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Occupancy; Reservation; Renewable energy; Environmental economics; Natural resource economics; Power (physics); Business; Economics; Computer science; Engineering; Architectural engineering; Electrical engineering","score_opus":0.01708438022923216,"score_gpt":0.2596673391034374,"score_spread":0.24258295887420525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389404242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9607484,0.0008595373,0.020571453,0.0004788964,0.00006369171,0.00024034182,0.0015157736,0.00011634792,0.015405514],"genre_scores_gemma":[0.9966164,0.00012409585,0.0015370314,0.000011460304,0.000006647457,0.000024339979,0.00018208232,0.000016271208,0.0014815738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992286,0.00036400332,0.000019968296,0.00007993621,0.00016175194,0.00014575032],"domain_scores_gemma":[0.9980228,0.0013629018,0.0000909478,0.00009856214,0.00030456219,0.00012030256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019831369,0.0010813202,0.0012119123,0.00094733614,0.00036042955,0.0021331802,0.0012076072,0.0013706733,0.0049286713],"category_scores_gemma":[0.0032457737,0.0005972522,0.0014311901,0.0013309879,0.0005220847,0.0016044651,0.0008701693,0.0010375679,0.00035158524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065721077,0.00013480673,0.0028430212,0.000118005264,0.00009718918,0.00015197734,0.000017971555,0.9847532,0.0012954468,0.002560516,0.0004357183,0.006934929],"study_design_scores_gemma":[0.000049084392,0.00044552528,0.0055816653,0.00002157055,0.00012815224,0.000044142074,0.00012693649,0.9901168,0.0011190148,0.001884883,0.0004541156,0.000028136548],"about_ca_topic_score_codex":0.020874687,"about_ca_topic_score_gemma":0.02083998,"teacher_disagreement_score":0.020874687,"about_ca_system_score_codex":0.002953024,"about_ca_system_score_gemma":0.0014033655,"threshold_uncertainty_score":0.04150635},"labels":[],"label_agreement":null},{"id":"W4389545142","doi":"10.1109/icee59167.2023.10334880","title":"Reliability-Based Design of Time-Varying Electricity Tariff","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Tariff; Reliability (semiconductor); Reliability engineering; Computer science; Electricity; Demand response; Energy management; Sensitivity (control systems); Energy consumption; Consumption (sociology); Smart grid; Energy (signal processing); Power (physics); Environmental economics; Engineering; Business; Economics","score_opus":0.013272982454265295,"score_gpt":0.1989605072604379,"score_spread":0.18568752480617262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389545142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03466045,0.0002231365,0.958151,0.00011822006,0.000036631638,0.00011599465,0.000036529214,0.00023525245,0.0064227376],"genre_scores_gemma":[0.92204005,0.00015245436,0.07585557,0.000033542998,0.000012426414,0.00012481445,0.00004404832,0.00004844248,0.001688787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99927396,0.0002486119,0.000028566345,0.00011387581,0.00023450048,0.00010045998],"domain_scores_gemma":[0.999022,0.00035987035,0.00017399604,0.00005531853,0.00033591624,0.000052818144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015142866,0.0010531594,0.0006951308,0.00073020166,0.0003281097,0.00093107554,0.0013034603,0.0008173621,0.0017730682],"category_scores_gemma":[0.0022832311,0.00055705145,0.00060068665,0.0004133102,0.00044363886,0.00078011694,0.0006870142,0.00080418476,0.00025351046],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033007705,0.00002348308,0.0001529678,0.0000362674,0.0000100009565,0.00004093402,0.000020856449,0.98325884,0.0029912805,0.003914446,0.00019588813,0.009322019],"study_design_scores_gemma":[0.0000036607823,0.000021373151,0.000030997642,0.0000014671708,0.0000030656836,0.000007635418,0.0000030911426,0.99891543,0.00042182312,0.00046598053,0.00012337933,0.000002105995],"about_ca_topic_score_codex":0.0026994492,"about_ca_topic_score_gemma":0.0019425303,"teacher_disagreement_score":0.0026994492,"about_ca_system_score_codex":0.00089532044,"about_ca_system_score_gemma":0.0010373233,"threshold_uncertainty_score":0.0080084205},"labels":[],"label_agreement":null},{"id":"W4389558906","doi":"10.1088/1742-6596/2654/1/012099","title":"Model predictive control for demand response in all-electric school buildings","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; Concordia University","funders":"","keywords":"Flexibility (engineering); Electricity; Model predictive control; Demand response; Peak demand; Thermal comfort; Electricity price; Computer science; Automotive engineering; Environmental science; Environmental economics; Control (management); Engineering; Economics; Electrical engineering; Meteorology","score_opus":0.024026318459120812,"score_gpt":0.24500749419985784,"score_spread":0.22098117574073703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389558906","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.371414,0.0005894265,0.6059412,0.00038674028,0.00009624174,0.000099010926,0.00018414001,0.0012003442,0.020088922],"genre_scores_gemma":[0.9975389,0.000038579987,0.0015236478,0.00000993778,0.0000033160372,0.0000121232,0.000020770543,0.0000060332277,0.0008466563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998073,0.000054845492,0.0000068689296,0.000032122825,0.000059258306,0.000039621482],"domain_scores_gemma":[0.9997309,0.00014071302,0.000040158244,0.000013308999,0.000062420426,0.000012465061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035968638,0.0005285227,0.0005319744,0.00020310564,0.00030519612,0.0006508649,0.00057240773,0.00030402493,0.001637493],"category_scores_gemma":[0.00063544646,0.00024395029,0.0002538677,0.0002893354,0.00026089264,0.00027301197,0.00035071114,0.00050928415,0.00014393863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000725632,0.000038160488,0.00034544853,0.000032448745,0.000014107617,0.00003143792,0.000020746309,0.98890215,0.0014909719,0.0007154874,0.0002549523,0.008081411],"study_design_scores_gemma":[0.000005860907,0.000019947876,0.00019970746,0.0000013782528,0.0000031753839,0.0000018349323,0.0000058636633,0.9990276,0.00033635873,0.00027129822,0.00012499126,0.0000020114983],"about_ca_topic_score_codex":0.029503627,"about_ca_topic_score_gemma":0.025647836,"teacher_disagreement_score":0.029503627,"about_ca_system_score_codex":0.00069191033,"about_ca_system_score_gemma":0.0005530938,"threshold_uncertainty_score":0.058663785},"labels":[],"label_agreement":null},{"id":"W4389600135","doi":"10.48550/arxiv.2312.05073","title":"A Distributed ADMM-based Deep Learning Approach for Thermal Control in Multi-Zone Buildings under Demand Response Events","year":2023,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; Scalability; Computer science; Renewable energy; Distributed computing; Distributed generation; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.05738411943058143,"score_gpt":0.18914438743959985,"score_spread":0.1317602680090184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389600135","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013813617,0.00013081187,0.9837309,0.00022453061,0.000044934135,0.000017266322,0.000040031508,0.00035216054,0.0016458614],"genre_scores_gemma":[0.8670881,0.00010139759,0.128921,0.00017409009,0.00005359016,0.00009725178,0.00015676186,0.00007457676,0.003333222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981695,0.000051404346,0.000008582863,0.000052819152,0.000040139184,0.000030157362],"domain_scores_gemma":[0.99958783,0.00021190655,0.000045352703,0.000029772742,0.00009479442,0.00003020594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006843138,0.00066820387,0.0008129199,0.00025450898,0.00034397453,0.000650557,0.0010328518,0.0008641816,0.0013035975],"category_scores_gemma":[0.0012324953,0.0004270188,0.00047323343,0.00039643818,0.0005341129,0.0006201371,0.000839924,0.0013816594,0.00018975993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002205641,0.000013432375,0.0001469221,0.000012404187,0.00001016479,0.00001204833,0.000009894537,0.9868478,0.00036194644,0.0011024609,0.00029655686,0.011164323],"study_design_scores_gemma":[0.0000019691252,0.000003309766,0.000011772058,6.2348585e-7,8.1779524e-7,9.366327e-7,0.0000011348668,0.99944633,0.00006111077,0.00041770193,0.00005361949,5.5036594e-7],"about_ca_topic_score_codex":0.0074431645,"about_ca_topic_score_gemma":0.009453237,"teacher_disagreement_score":0.0074431645,"about_ca_system_score_codex":0.0007145406,"about_ca_system_score_gemma":0.0011408041,"threshold_uncertainty_score":0.0147996545},"labels":[],"label_agreement":null},{"id":"W4389778837","doi":"10.1016/j.segan.2023.101255","title":"Intelligent categorization and interactive mechanism for smart demand side management of residential consumers","year":2023,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Categorization; Quarter (Canadian coin); Demand side; Environmental economics; Baseline (sea); Classifier (UML); Duration (music); Peak load; Load profile; Operations management; Reliability engineering; Operations research; Artificial intelligence; Electricity; Economics; Engineering; Automotive engineering; Electrical engineering","score_opus":0.0054193373685215785,"score_gpt":0.20547319163417974,"score_spread":0.20005385426565817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389778837","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3709247,0.00048450383,0.59614867,0.00091633055,0.00033358007,0.00035484871,0.00037981806,0.008998301,0.021459214],"genre_scores_gemma":[0.96845657,0.000039593284,0.027482005,0.00010961433,0.00003058021,0.00006338355,0.00016428296,0.00004181414,0.0036121784],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950814,0.000096966025,0.000029687015,0.00014791646,0.00013400978,0.000083295425],"domain_scores_gemma":[0.9993979,0.00015446148,0.000056682646,0.00013492108,0.00019429004,0.000061739505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070254994,0.00030271325,0.0004839005,0.00063844013,0.00083035324,0.001216669,0.0012108947,0.0006562556,0.0042908555],"category_scores_gemma":[0.0012220959,0.00018440264,0.00028487408,0.0005009056,0.00030933798,0.0014382271,0.0010016742,0.00048794714,0.00082371023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021985858,0.0024514112,0.01834123,0.0002092076,0.00015377531,0.00065494614,0.0015291178,0.06683186,0.11373801,0.044426944,0.027888477,0.72157645],"study_design_scores_gemma":[0.000063718326,0.0002012654,0.005789132,0.000018321989,0.000071923445,0.00013332258,0.00040241354,0.93308896,0.028392162,0.022368614,0.009409494,0.000060686678],"about_ca_topic_score_codex":0.0023761063,"about_ca_topic_score_gemma":0.0037374527,"teacher_disagreement_score":0.0042908555,"about_ca_system_score_codex":0.0006873692,"about_ca_system_score_gemma":0.0006560101,"threshold_uncertainty_score":0.014354348},"labels":[],"label_agreement":null},{"id":"W4389977998","doi":"10.18280/psees.060102","title":"Performance Analysis of Multi-Oriented Residential Rooftop PV System in Indonesia Towards Net Zero Emission by 2060","year":2022,"lang":"en","type":"article","venue":"Progress in Solar Energy and Engineering Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Zero emission; Zero-energy building; Net (polyhedron); Zero (linguistics); Environmental science; Architectural engineering; Geography; Engineering; Mathematics; Electrical engineering; Solar energy; Geometry","score_opus":0.005220395784046317,"score_gpt":0.1921009594684934,"score_spread":0.18688056368444708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389977998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962773,0.00003378212,0.00081426284,0.000019302994,0.0000037521336,0.000012546787,0.00014368146,0.000059511247,0.0026357132],"genre_scores_gemma":[0.9991228,0.000023654757,0.0001968501,0.0000037793793,6.6295166e-7,0.000003884088,0.00009294286,0.000006483653,0.00054901175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998504,0.000025847954,0.000011174997,0.000031288673,0.00005525111,0.000025935093],"domain_scores_gemma":[0.9998814,0.000025076277,0.00001756811,0.000009926143,0.000052436684,0.000013682266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022822252,0.0002893357,0.00033852344,0.00023294364,0.00023594857,0.0005567266,0.00026794456,0.00023631238,0.0011760864],"category_scores_gemma":[0.00022091219,0.000108425345,0.00031210034,0.00027835774,0.00016036758,0.0002298102,0.00021217144,0.00022347391,0.00038821506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026321977,0.00068645953,0.12969859,0.00049286726,0.00022461802,0.0022093444,0.0004684157,0.5461239,0.2548605,0.0009924894,0.0021175328,0.059493143],"study_design_scores_gemma":[0.00009979805,0.002775712,0.2786073,0.000038875878,0.0002377821,0.00076323125,0.0008401343,0.5736072,0.14040415,0.0004327863,0.002131351,0.000061671366],"about_ca_topic_score_codex":0.005363932,"about_ca_topic_score_gemma":0.004954705,"teacher_disagreement_score":0.005363932,"about_ca_system_score_codex":0.00041855444,"about_ca_system_score_gemma":0.00018405938,"threshold_uncertainty_score":0.010665417},"labels":[],"label_agreement":null},{"id":"W4390075236","doi":"10.1109/lcsys.2023.3345368","title":"Game Theoretical Formulation for Residential Community Microgrid via Mean Field Theory: Proof of Concept","year":2023,"lang":"en","type":"article","venue":"IEEE Control Systems Letters","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Proof of concept; Microgrid; Game theory; Field (mathematics); Mathematical economics; Mathematics; Computer science; Pure mathematics; Artificial intelligence","score_opus":0.009775826077872364,"score_gpt":0.2158748066475795,"score_spread":0.20609898056970713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390075236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003837093,0.00033950567,0.9703029,0.00083759153,0.00009471109,0.00012230196,0.00011169543,0.00006398244,0.024290185],"genre_scores_gemma":[0.6183028,0.0020393417,0.34717864,0.001047078,0.00034783426,0.0016064591,0.00023849506,0.0001274261,0.029111894],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999716,0.00011284939,0.000007687727,0.000036583202,0.000089720925,0.000037078808],"domain_scores_gemma":[0.9993949,0.00036844178,0.000053075582,0.000022606715,0.00012422091,0.00003671984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010182195,0.00095695246,0.0008549279,0.0005050373,0.00056333723,0.0012462866,0.0012531799,0.0013641007,0.012012963],"category_scores_gemma":[0.0022489885,0.00043878992,0.0008013357,0.0006206976,0.0010395868,0.0012142592,0.0013599965,0.0016651747,0.00090365385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026868738,0.00008157758,0.00023999176,0.00016670195,0.000021501368,0.00019733126,0.00012246385,0.43612048,0.0011903379,0.5425535,0.0056534014,0.013625931],"study_design_scores_gemma":[0.000023942921,0.000031591157,0.00007701726,0.000030199275,0.0000066941743,0.00005179657,0.000040656214,0.8850308,0.000102361104,0.11103037,0.0035649135,0.000009689511],"about_ca_topic_score_codex":0.0046933084,"about_ca_topic_score_gemma":0.003887461,"teacher_disagreement_score":0.012012963,"about_ca_system_score_codex":0.0013115116,"about_ca_system_score_gemma":0.0017627188,"threshold_uncertainty_score":0.04018736},"labels":[],"label_agreement":null},{"id":"W4390176003","doi":"10.3390/en17010114","title":"Bayesian Inference-Based Energy Management Strategy for Techno-Economic Optimization of a Hybrid Microgrid","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Energy management; Inference; Computer science; Bayesian inference; Energy consumption; Bayesian probability; Mathematical optimization; Operations research; Artificial intelligence; Engineering; Control (management); Energy (signal processing); Mathematics","score_opus":0.011189644169557648,"score_gpt":0.21722012832774074,"score_spread":0.2060304841581831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390176003","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018686885,0.000110885834,0.9733493,0.00030972288,0.000017267821,0.00007718771,0.000055868728,0.00011041235,0.007282564],"genre_scores_gemma":[0.8441672,0.00021076931,0.15061972,0.00011121474,0.00003670321,0.00031034564,0.00011626407,0.000062103616,0.004365597],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991259,0.00042277412,0.000026328313,0.00009594131,0.00024797342,0.00008112252],"domain_scores_gemma":[0.99893767,0.00077376864,0.00009236864,0.000028304468,0.00012850609,0.00003937827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00270591,0.0008470498,0.0011046113,0.0008365207,0.0004912756,0.001479814,0.0012574131,0.0010530986,0.00305343],"category_scores_gemma":[0.0039726114,0.00074767554,0.00093898835,0.00056461524,0.0009765662,0.0013145437,0.0012169009,0.0011397788,0.0002522721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002807699,0.000024090807,0.00019157537,0.000022840999,0.000028898685,0.000029757311,0.00002448741,0.97086346,0.0002924384,0.021871055,0.00021930296,0.0064039687],"study_design_scores_gemma":[0.0000048576535,0.000009165479,0.000036985104,0.000003127272,0.000004519957,0.000002787508,0.0000044387816,0.9948073,0.00006467607,0.004924023,0.00013524485,0.0000029801167],"about_ca_topic_score_codex":0.0073364307,"about_ca_topic_score_gemma":0.006406358,"teacher_disagreement_score":0.0073364307,"about_ca_system_score_codex":0.0016170933,"about_ca_system_score_gemma":0.0018435417,"threshold_uncertainty_score":0.014587462},"labels":[],"label_agreement":null},{"id":"W4390331685","doi":"10.1016/j.energy.2023.130173","title":"Residential demand response program modelling to compliment grid composition and changes in energy efficiency","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Electrification; Grid; Renewable energy; Environmental economics; Electricity; Demand response; Variable renewable energy; Stock (firearms); Efficient energy use; Flexibility (engineering); Business; Environmental science; Engineering; Economics; Electric power system; Power (physics); Electrical engineering","score_opus":0.014026214498474448,"score_gpt":0.22764872741534403,"score_spread":0.2136225129168696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390331685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35637832,0.0000637918,0.58802414,0.0005444293,0.00011548657,0.00018332245,0.0017863768,0.0022489205,0.05065529],"genre_scores_gemma":[0.9583801,0.000038237067,0.026259938,0.000065451946,0.000012226687,0.00009305064,0.00053197425,0.00033092388,0.014288054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978095,0.00009156768,0.000007671608,0.0000411258,0.00004104168,0.000037783164],"domain_scores_gemma":[0.9994649,0.0002792971,0.000035362515,0.000050903956,0.00014727807,0.0000222104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049001706,0.000361147,0.00041908643,0.00031724735,0.00031527455,0.00072227826,0.00092689827,0.00072980404,0.008515384],"category_scores_gemma":[0.0016176777,0.00043861908,0.0005851667,0.0005412176,0.00019395999,0.0009775944,0.0003445934,0.000816991,0.0007731034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002670537,0.00006127816,0.00076702744,0.00001649811,0.000008388349,0.000020172329,0.00002809923,0.99259984,0.00045944419,0.0019496912,0.000586016,0.0034768477],"study_design_scores_gemma":[0.0000024591811,0.000004419579,0.00011429256,9.2714885e-7,0.0000026944658,0.0000025251645,0.000010375454,0.998978,0.00023621945,0.00031820804,0.00032839266,0.0000016087856],"about_ca_topic_score_codex":0.037063885,"about_ca_topic_score_gemma":0.042069092,"teacher_disagreement_score":0.037063885,"about_ca_system_score_codex":0.0012073542,"about_ca_system_score_gemma":0.0010740085,"threshold_uncertainty_score":0.073696315},"labels":[],"label_agreement":null},{"id":"W4390603604","doi":"10.1109/tempr.2024.3350510","title":"Design of Multi-Settlement Electricity Markets Considering Demand Response and Battery Energy Storage Systems Participation","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Settlement (finance); Demand response; Electricity market; Battery storage; Electricity; Computer science; Renewable energy; Battery (electricity); Reliability engineering; Reliability (semiconductor); Operations research; Generator (circuit theory); Economics; Econometrics; Engineering; Power (physics); Electrical engineering","score_opus":0.018614887817782255,"score_gpt":0.23801900171846582,"score_spread":0.21940411390068357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390603604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017690979,0.00016890954,0.9750866,0.0001927527,0.000039353792,0.0001480914,0.000044850785,0.00009905797,0.006529253],"genre_scores_gemma":[0.8328836,0.00035499252,0.16090944,0.0000838846,0.0000593299,0.0003789352,0.00009098573,0.00008266904,0.0051560528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986473,0.0005869117,0.000054168577,0.00025086646,0.00027779513,0.00018305623],"domain_scores_gemma":[0.99903536,0.0004424818,0.0001679076,0.000058009715,0.00017844529,0.00011779124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024608758,0.0009715515,0.0015083445,0.0005556333,0.00053504057,0.0023544647,0.002876567,0.0015692201,0.0041265604],"category_scores_gemma":[0.0031030744,0.0010784812,0.0012655514,0.0005496418,0.0008790419,0.0024623524,0.0019863462,0.0013751267,0.00039299033],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032581745,0.000047042802,0.00020425754,0.00006419101,0.000027523456,0.00015464437,0.000037830683,0.95031905,0.000995196,0.03964738,0.00037805055,0.008092195],"study_design_scores_gemma":[0.000012772265,0.000032717584,0.00003589669,0.0000037884513,0.0000056157596,0.000018897274,0.000014482316,0.99498653,0.00015532346,0.0042419075,0.00048736206,0.000004775064],"about_ca_topic_score_codex":0.0019444877,"about_ca_topic_score_gemma":0.0020130456,"teacher_disagreement_score":0.0041265604,"about_ca_system_score_codex":0.0013508288,"about_ca_system_score_gemma":0.002216491,"threshold_uncertainty_score":0.013804674},"labels":[],"label_agreement":null},{"id":"W4390940400","doi":"10.2139/ssrn.4673749","title":"Distributional forecasting of electricity DART spreads with a covariate-dependent mixture model","year":2024,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université de Montréal; Concordia University","funders":"","keywords":"Covariate; Stylized fact; Dart; Econometrics; Spike (software development); Electricity; Flexibility (engineering); Component (thermodynamics); Statistics; Computer science; Mathematics; Economics; Engineering; Physics","score_opus":0.009643666902049996,"score_gpt":0.19744136334301088,"score_spread":0.1877976964409609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390940400","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5503749,0.0007436093,0.44362766,0.0011119278,0.00021509938,0.00007230698,0.0011115222,0.0007258479,0.0020171339],"genre_scores_gemma":[0.9809269,0.0002920184,0.014670821,0.000057494926,0.00010278964,0.000034911965,0.001250214,0.000050541374,0.0026142893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906677,0.0003728608,0.000052108633,0.0003018701,0.00011488038,0.000091476526],"domain_scores_gemma":[0.99117494,0.0061744465,0.00084755936,0.0007763518,0.00078791566,0.00023888964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004341341,0.00082863483,0.0016919055,0.0012410182,0.00045678482,0.0016670307,0.0018259629,0.0020369473,0.0023107226],"category_scores_gemma":[0.015316922,0.0008536202,0.0013190303,0.0013003554,0.0007393496,0.0029075062,0.0011505268,0.0025616519,0.00081991294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026521413,0.00007547775,0.009550964,0.000041162948,0.00009771358,0.000105694286,0.000082862345,0.95579594,0.0008460967,0.016248759,0.0011451887,0.015744919],"study_design_scores_gemma":[0.000004929279,0.000012063435,0.00072400185,0.0000026657228,0.0000054733505,0.000008997013,0.000004645394,0.9970196,0.000082191575,0.0020393638,0.00008866659,0.0000073026013],"about_ca_topic_score_codex":0.0086335605,"about_ca_topic_score_gemma":0.006486413,"teacher_disagreement_score":0.0086335605,"about_ca_system_score_codex":0.00083685864,"about_ca_system_score_gemma":0.0005570902,"threshold_uncertainty_score":0.02295947},"labels":[],"label_agreement":null},{"id":"W4390970819","doi":"10.1109/irec59750.2023.10389446","title":"Co-Simulation Framework OpenDSS-Python to Consider Distribution Grid Constraints in a Transactive Energy System","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Python (programming language); Computer science; Grid; Distribution grid; Probabilistic logic; Smart grid; Demand response; Distributed computing; Electric power system; Electricity; Distributed generation; Renewable energy; Power (physics); Engineering; Operating system; Electrical engineering","score_opus":0.01723010262122564,"score_gpt":0.2662488637525554,"score_spread":0.24901876113132976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390970819","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026246628,0.000117500414,0.9347507,0.00038352425,0.00018588491,0.00029775628,0.002109079,0.02269077,0.013218155],"genre_scores_gemma":[0.5985707,0.00048322353,0.3816304,0.00036546696,0.00008696062,0.0015910808,0.00421967,0.0054811966,0.007571319],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926656,0.00030917313,0.00006435562,0.00009696275,0.00018108946,0.00008188101],"domain_scores_gemma":[0.9980153,0.0010815116,0.00013922654,0.00023468133,0.00037740887,0.00015198362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019817557,0.0011924084,0.0009895001,0.0007740171,0.00068803737,0.0018058573,0.002672986,0.0011561402,0.009801099],"category_scores_gemma":[0.0031935498,0.0006168252,0.0015447595,0.00064704946,0.00088424614,0.0014084083,0.0025220779,0.002243487,0.0013831379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104345956,0.00011751426,0.0018242976,0.00016648314,0.00010391318,0.00015732572,0.00016548982,0.96063226,0.0013530202,0.022296695,0.0042357077,0.00884294],"study_design_scores_gemma":[0.000028656956,0.000012699226,0.00009461608,0.000010350187,0.000009257677,0.000020829537,0.000018230396,0.98975337,0.00070970494,0.004905899,0.0044252137,0.000011064974],"about_ca_topic_score_codex":0.01000176,"about_ca_topic_score_gemma":0.008762589,"teacher_disagreement_score":0.01000176,"about_ca_system_score_codex":0.0009465285,"about_ca_system_score_gemma":0.002388411,"threshold_uncertainty_score":0.03278792},"labels":[],"label_agreement":null},{"id":"W4391022010","doi":"10.1109/cdc49753.2023.10383868","title":"Learning Optimal Policies in Mean Field Models with Kullback-Leibler Regularization","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Emera (Canada)","funders":"Agence Nationale de la Recherche; National Science Foundation","keywords":"Regularization (linguistics); Kullback–Leibler divergence; Computer science; Field (mathematics); Artificial intelligence; Machine learning; Mathematics","score_opus":0.011587748675967242,"score_gpt":0.19683045395614193,"score_spread":0.1852427052801747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391022010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015986636,0.00038821565,0.9809137,0.0006219177,0.000032041542,0.000026405309,0.000042065465,0.00015907621,0.0018298703],"genre_scores_gemma":[0.8639643,0.0008590187,0.12744434,0.0004159088,0.00015031418,0.00029804045,0.00016385656,0.00012812938,0.0065760757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985953,0.0007536314,0.000055524135,0.0002344105,0.00022640012,0.00013470181],"domain_scores_gemma":[0.9941817,0.00474966,0.00043220524,0.0001617574,0.0003030251,0.00017164045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039277305,0.0010519425,0.002030472,0.00082305627,0.00049391587,0.0017454703,0.0013951488,0.0020781425,0.0015245352],"category_scores_gemma":[0.011711622,0.0007777372,0.000771452,0.00071744085,0.0025889284,0.0026068934,0.001618206,0.0020580443,0.00026181713],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003945588,0.000038731167,0.00034290313,0.00006171641,0.000033666336,0.00003723408,0.000050042472,0.90496486,0.00024385043,0.08504578,0.00070566556,0.00843614],"study_design_scores_gemma":[0.0000062968475,0.000012217658,0.00003685696,0.0000051248303,0.0000024272758,0.0000044074263,0.0000036632773,0.9645863,0.000048619837,0.035163574,0.0001252031,0.0000052243486],"about_ca_topic_score_codex":0.00747708,"about_ca_topic_score_gemma":0.0059942408,"teacher_disagreement_score":0.00747708,"about_ca_system_score_codex":0.0021395423,"about_ca_system_score_gemma":0.002472956,"threshold_uncertainty_score":0.0207721},"labels":[],"label_agreement":null},{"id":"W4391099498","doi":"10.3390/su16020891","title":"Enhancing Renewable Energy Use in Residential Communities: Analyzing Storage, Trading, and Combinations","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Incheon National University","keywords":"Renewable energy; Environmental economics; Consumption (sociology); Energy storage; Grid; Renewable resource; Battery storage; Photovoltaic system; Environmental science; Computer science; Business; Battery (electricity); Power (physics); Engineering; Economics; Mathematics; Electrical engineering","score_opus":0.009138403949320322,"score_gpt":0.22901366127802802,"score_spread":0.2198752573287077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391099498","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98664784,0.00012522154,0.010381547,0.000063727915,0.0000036032875,0.000042304182,0.000065159344,0.000022401087,0.002648206],"genre_scores_gemma":[0.99782324,0.000062399544,0.0017450014,0.0000042090082,0.0000019225545,0.000011949549,0.000027358346,0.000004633522,0.00031940904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956554,0.00018131197,0.000014743279,0.000052142408,0.00009447859,0.00009178022],"domain_scores_gemma":[0.99905926,0.00056925457,0.00014168746,0.00005589748,0.00011822443,0.000055572185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076150685,0.0006086993,0.0005426213,0.00079147046,0.00036480668,0.0011850303,0.00073161285,0.00073272677,0.0009126211],"category_scores_gemma":[0.0019052133,0.00027203813,0.0007315895,0.0011169487,0.00047763757,0.0014342456,0.0007406104,0.00027887596,0.000080833255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011783981,0.00021319177,0.019835671,0.00006178373,0.00009290062,0.0004579622,0.000057909514,0.9624918,0.0024426011,0.0019212272,0.00015989832,0.012147174],"study_design_scores_gemma":[0.000008258574,0.00010347183,0.005604808,0.0000068551567,0.000029138237,0.00006585662,0.00022999596,0.99145496,0.0010681046,0.0012822367,0.00013365448,0.000012693379],"about_ca_topic_score_codex":0.011503984,"about_ca_topic_score_gemma":0.01988951,"teacher_disagreement_score":0.011503984,"about_ca_system_score_codex":0.0009791837,"about_ca_system_score_gemma":0.0006764186,"threshold_uncertainty_score":0.022874057},"labels":[],"label_agreement":null},{"id":"W4391127873","doi":"10.61091/jcmcc117-09","title":"Quantitative Analysis of Distribution and Reliability Based on Maximum Capacity Segmented Subscribers on Distribution Lines","year":2023,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Reliability (semiconductor); Mathematics; Statistics; Econometrics; Reliability engineering; Engineering; Mathematical analysis","score_opus":0.016006135177180178,"score_gpt":0.24180022739095022,"score_spread":0.22579409221377006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391127873","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.519793,0.00036590925,0.46331856,0.00026857026,0.000015096268,0.000051899537,0.00036197304,0.00024113336,0.0155837145],"genre_scores_gemma":[0.9939904,0.00007305442,0.005276244,0.0000066941616,0.0000082162005,0.000014534197,0.00005064793,0.0000136422905,0.0005665793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993568,0.0002523924,0.00002295753,0.00008202541,0.00021533652,0.00007037537],"domain_scores_gemma":[0.99617034,0.002615687,0.0004505019,0.00032054927,0.0003814241,0.00006146961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011192556,0.00033131463,0.0002320616,0.0011209537,0.00026231058,0.0008895971,0.0005942522,0.00037439243,0.0020603498],"category_scores_gemma":[0.0047179526,0.00018692545,0.0003709062,0.0011213901,0.0008847492,0.001436694,0.00036194065,0.00037862922,0.0001702603],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008583199,0.000023839959,0.0052345674,0.00007424478,0.000030399207,0.00013441416,0.00020288386,0.89830303,0.008004739,0.0742415,0.00039843685,0.01326612],"study_design_scores_gemma":[0.0000028172324,0.000060200513,0.003602055,0.00001278954,0.000013315122,0.00011683426,0.00013065376,0.97449684,0.0028288118,0.017915173,0.00080949994,0.000011049672],"about_ca_topic_score_codex":0.0013985757,"about_ca_topic_score_gemma":0.0010767899,"teacher_disagreement_score":0.0020603498,"about_ca_system_score_codex":0.00107203,"about_ca_system_score_gemma":0.0002281355,"threshold_uncertainty_score":0.0077781677},"labels":[],"label_agreement":null},{"id":"W4391170553","doi":"10.1049/smc2.12075","title":"An artificial intelligence‐based non‐intrusive load monitoring of energy consumption in an electrical energy system using a modified K‐Nearest Neighbour algorithm","year":2024,"lang":"en","type":"article","venue":"IET Smart Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"FP7 International Cooperation; International Development Research Centre","keywords":"Computer science; Energy (signal processing); Work (physics); Energy consumption; Machine learning; Artificial intelligence; Algorithm; Engineering","score_opus":0.03552666793284705,"score_gpt":0.26908638205150426,"score_spread":0.23355971411865722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391170553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.189093,0.00024088101,0.8063374,0.00019001486,0.00006774633,0.00009767815,0.00013063927,0.000996993,0.0028456359],"genre_scores_gemma":[0.8468939,0.00004744902,0.15022801,0.000053166437,0.000020194104,0.00006583423,0.0001975968,0.00003605981,0.0024577277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943346,0.00012219718,0.0000483428,0.00017247212,0.00017731106,0.000046238692],"domain_scores_gemma":[0.99940896,0.00023755715,0.000084553736,0.000060625647,0.00018500052,0.00002322134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005977078,0.00051974534,0.0007649347,0.00073780457,0.00036761304,0.00076160557,0.0011214612,0.0008149194,0.0007460642],"category_scores_gemma":[0.001721945,0.00036131594,0.000626187,0.00071154593,0.00026097774,0.0007606391,0.00048580993,0.00068416516,0.0002804173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022006025,0.0002503658,0.0053066113,0.00006176332,0.0001175624,0.00011504196,0.00012327601,0.7716979,0.009508171,0.0015199977,0.0011376357,0.20994163],"study_design_scores_gemma":[0.000002191401,0.000010879319,0.000359584,0.0000011561204,0.0000019682634,0.000006402921,0.0000036027632,0.9988432,0.00052538986,0.00016300028,0.000080032056,0.0000025675402],"about_ca_topic_score_codex":0.010457439,"about_ca_topic_score_gemma":0.010368328,"teacher_disagreement_score":0.010457439,"about_ca_system_score_codex":0.00066073675,"about_ca_system_score_gemma":0.00053417403,"threshold_uncertainty_score":0.02079314},"labels":[],"label_agreement":null},{"id":"W4391176683","doi":"10.2139/ssrn.4704408","title":"Optimizing Cogenerated Systems: A Dual Perspective on Thermodynamics and Economics with Integrated Desalination","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Dual (grammatical number); Perspective (graphical); Desalination; Dual purpose; Thermodynamics; Economics; Environmental science; Mathematical economics; Computer science; Engineering; Physics; Chemistry; Mechanical engineering; Philosophy; Artificial intelligence","score_opus":0.005742903468413458,"score_gpt":0.1982760119715525,"score_spread":0.19253310850313904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391176683","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07309357,0.005823197,0.8476906,0.00845569,0.00078171515,0.000089337096,0.00021729825,0.00011695706,0.0637317],"genre_scores_gemma":[0.9240509,0.0032306858,0.05446163,0.00047799243,0.0005181214,0.00011470729,0.0000867022,0.0001152548,0.016944014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991798,0.00039651277,0.000027001104,0.000106388696,0.00022284518,0.00006739313],"domain_scores_gemma":[0.99932456,0.00045524078,0.000060117003,0.000045716984,0.000072547315,0.000041771415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013624395,0.0013236968,0.0019922177,0.0004995117,0.0005141069,0.0032410226,0.0012885923,0.0021494431,0.0043075033],"category_scores_gemma":[0.0030263097,0.00076088845,0.0011995084,0.0009014626,0.0017415265,0.004595364,0.0017147363,0.002170562,0.00023200297],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007493667,0.00010985121,0.00028532447,0.0002159604,0.00010112751,0.00009671933,0.000047117508,0.6405134,0.0012091785,0.34268045,0.0011990434,0.013466834],"study_design_scores_gemma":[0.000038369046,0.000061304665,0.00029329275,0.000039031478,0.000042978587,0.000027948516,0.000044374985,0.6622873,0.00077472796,0.33352193,0.0028455495,0.000023193079],"about_ca_topic_score_codex":0.0021723723,"about_ca_topic_score_gemma":0.0024616073,"teacher_disagreement_score":0.0043075033,"about_ca_system_score_codex":0.0018844823,"about_ca_system_score_gemma":0.0016016747,"threshold_uncertainty_score":0.0144100785},"labels":[],"label_agreement":null},{"id":"W4391214730","doi":"10.2139/ssrn.4706893","title":"Deep Reinforcement Learning for Economic Battery Dispatch: A Comprehensive Comparison of Algorithms and Experiment Design Choices","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Hyperparameter; Computer science; Battery (electricity); Benchmark (surveying); Economic dispatch; Artificial intelligence; Machine learning; Power (physics); Electric power system","score_opus":0.022419806225838015,"score_gpt":0.2689997521670136,"score_spread":0.2465799459411756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391214730","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3803948,0.0016463173,0.60911345,0.0011628481,0.00021096769,0.0009472271,0.000659614,0.00067704334,0.0051877564],"genre_scores_gemma":[0.8964522,0.00035452895,0.099978946,0.00024642196,0.000054227254,0.00084167067,0.00039551468,0.00008474496,0.0015918681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99181527,0.0066832956,0.0002577017,0.0005261308,0.00046859053,0.00024901173],"domain_scores_gemma":[0.92332137,0.069457,0.0014660214,0.0035607086,0.0016087972,0.0005861489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026612705,0.0011081151,0.0018893706,0.00054686854,0.00036970963,0.0011863931,0.0014827211,0.0018677436,0.0028680586],"category_scores_gemma":[0.051553693,0.0006475846,0.0009850407,0.00047497608,0.0010910876,0.002600301,0.0012576196,0.002182434,0.00027540224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01041789,0.0021165754,0.0049378127,0.0005537259,0.00083603035,0.000030215275,0.00009133608,0.8320848,0.0011593656,0.021438094,0.0015271202,0.124807104],"study_design_scores_gemma":[0.001261807,0.001350881,0.0013335494,0.000058220612,0.00020866451,0.0000157205,0.000022854334,0.9684665,0.0012620062,0.025335949,0.0006499648,0.00003375858],"about_ca_topic_score_codex":0.0020220927,"about_ca_topic_score_gemma":0.0017021188,"teacher_disagreement_score":0.026612705,"about_ca_system_score_codex":0.0016450213,"about_ca_system_score_gemma":0.0022222225,"threshold_uncertainty_score":0.14074308},"labels":[],"label_agreement":null},{"id":"W4391260617","doi":"10.30574/ijsra.2024.11.1.0080","title":"Software tools in energy management: utilization and impact in Canada, USA, and Africa","year":2024,"lang":"en","type":"article","venue":"International Journal of Science and Research Archive","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Software; Environmental resource management; Business; Environmental planning; Engineering; Geography; Computer science; Environmental science; Operating system","score_opus":0.04199695000510122,"score_gpt":0.3212593614896599,"score_spread":0.27926241148455866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391260617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9134329,0.009676675,0.0011032859,0.005529904,0.000059751754,0.00007204723,0.0005994304,0.000095486765,0.069430456],"genre_scores_gemma":[0.9859104,0.009257381,0.0012289502,0.0002767016,0.000007428061,0.000017778306,0.00021066716,0.000029705163,0.0030609579],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99766207,0.00036870586,0.000060208007,0.00016826804,0.0010132989,0.0007274371],"domain_scores_gemma":[0.99483055,0.0014237728,0.0004337349,0.000117003096,0.0022756967,0.0009193524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001968525,0.00032679917,0.00022235891,0.004355708,0.0028541132,0.0049115145,0.00080411806,0.00038416954,0.001309582],"category_scores_gemma":[0.0077980855,0.00013935275,0.00022711437,0.009157535,0.0023900033,0.0019373593,0.002427877,0.0007675063,0.00009553819],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045663113,0.00033844,0.23410054,0.00085569895,0.00011239833,0.0011252124,0.028592436,0.006296773,0.0022827073,0.06410204,0.011562215,0.650175],"study_design_scores_gemma":[0.00007418283,0.00029732846,0.5304598,0.002920155,0.00026121826,0.00073448825,0.13270614,0.0113671785,0.0053612967,0.0076382454,0.30798632,0.0001936592],"about_ca_topic_score_codex":0.9657448,"about_ca_topic_score_gemma":0.9821926,"teacher_disagreement_score":0.042160466,"about_ca_system_score_codex":0.042160466,"about_ca_system_score_gemma":0.062039472,"threshold_uncertainty_score":0.305897},"labels":[],"label_agreement":null},{"id":"W4391342823","doi":"10.1109/isgteurope56780.2023.10408104","title":"Contribution of Conventional Demand Response Resources to Peak Shaving of Power Substations","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Peaking power plant; Demand response; Peak demand; Flexibility (engineering); Reliability engineering; Reliability (semiconductor); Asset (computer security); Investment (military); Grid; Load Shedding; Power (physics); Load management; Computer science; Resource (disambiguation); Electric power system; Environmental economics; Electricity; Engineering; Electrical engineering; Economics; Computer security","score_opus":0.008360881852293424,"score_gpt":0.2262570875403289,"score_spread":0.21789620568803547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391342823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9001821,0.0019118608,0.046572205,0.0012018387,0.000094941344,0.00012767423,0.000739879,0.00067823473,0.04849124],"genre_scores_gemma":[0.9975169,0.00011683357,0.00086566835,0.000029611883,0.0000107540345,0.000004341548,0.00005399391,0.00002103601,0.0013809905],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951255,0.000146433,0.000013007256,0.00006407918,0.00014431449,0.00011969021],"domain_scores_gemma":[0.99812,0.0008341715,0.0002063733,0.00018421633,0.00046899132,0.0001862318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007649507,0.00052999577,0.00038671205,0.0005654737,0.00042267624,0.0014361419,0.001133033,0.0005224693,0.0056700776],"category_scores_gemma":[0.0030437445,0.00027379786,0.00021394405,0.00060556293,0.0005370531,0.00091683946,0.0007015865,0.0005288709,0.00047687738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012905403,0.000348469,0.04010165,0.00042799924,0.00018380284,0.0020748123,0.00040243292,0.7624577,0.014863222,0.025134578,0.005874496,0.14684026],"study_design_scores_gemma":[0.00011719118,0.00035528568,0.040459365,0.00006836926,0.00011673919,0.0006795062,0.0008282198,0.9219134,0.00683902,0.012593557,0.015961653,0.00006770717],"about_ca_topic_score_codex":0.03819531,"about_ca_topic_score_gemma":0.044292606,"teacher_disagreement_score":0.03819531,"about_ca_system_score_codex":0.0024213018,"about_ca_system_score_gemma":0.0012249565,"threshold_uncertainty_score":0.07594597},"labels":[],"label_agreement":null},{"id":"W4391351336","doi":"10.30574/ijsra.2024.11.1.0113","title":"Energy efficiency through variable frequency drives: industrial applications in Canada, USA, and Africa","year":2024,"lang":"en","type":"article","venue":"International Journal of Science and Research Archive","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variable (mathematics); Variable-frequency drive; Energy (signal processing); Efficient energy use; Environmental science; Engineering; Electrical engineering; Mathematics; Physics; Statistics","score_opus":0.028895883789755435,"score_gpt":0.2853896722392673,"score_spread":0.2564937884495119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391351336","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65701765,0.033254508,0.0032412617,0.010161715,0.00016063645,0.0001681899,0.0030154441,0.00019891458,0.29278165],"genre_scores_gemma":[0.955374,0.030052071,0.002626752,0.00034490862,0.000022192387,0.000020020338,0.0006722753,0.000037388723,0.010850409],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99946254,0.000031425763,0.000010248451,0.000040040246,0.00024114174,0.00021456859],"domain_scores_gemma":[0.9990802,0.00011972963,0.00004215164,0.000014475347,0.00063357514,0.00010978461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005342489,0.00033097685,0.00019848981,0.0018525586,0.0017555553,0.0019877714,0.00044271955,0.00026141928,0.002476041],"category_scores_gemma":[0.0017480289,0.000079241574,0.00019797683,0.0062939506,0.0005892461,0.0006141587,0.0005746668,0.00045910125,0.00018016332],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036882333,0.00020876272,0.12709263,0.00097122067,0.00006649087,0.0012085965,0.0042459243,0.008481711,0.002877695,0.03300829,0.038367566,0.78310233],"study_design_scores_gemma":[0.0000832848,0.00022744657,0.4685902,0.0015274781,0.00016772856,0.0009395069,0.038567293,0.0123664895,0.0060171178,0.005243073,0.46610385,0.00016660051],"about_ca_topic_score_codex":0.97190404,"about_ca_topic_score_gemma":0.9871565,"teacher_disagreement_score":0.02809596,"about_ca_system_score_codex":0.021448847,"about_ca_system_score_gemma":0.03188178,"threshold_uncertainty_score":0.15562302},"labels":[],"label_agreement":null},{"id":"W4391422956","doi":"10.1109/ias54024.2023.10406423","title":"A Model-Free Multi-Agent Reinforcement Learning Approach to Reach a Robust, Optimal, and Environment-Friendly Power Management in a Micro-Grid","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Photovoltaic system; Computer science; Artificial neural network; Renewable energy; Turbine; Grid; Hyperparameter; Wind power; Hyperparameter optimization; Environmentally friendly; Artificial intelligence; Engineering; Electrical engineering; Support vector machine","score_opus":0.020634060037473825,"score_gpt":0.19998211566988017,"score_spread":0.17934805563240636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391422956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01955877,0.00025153148,0.9752039,0.0002871325,0.000050120256,0.000054687902,0.000023202692,0.00026821977,0.004302497],"genre_scores_gemma":[0.9355716,0.00015963521,0.060838167,0.0001115684,0.000038325164,0.00014125172,0.000037216236,0.000028534701,0.0030737277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996723,0.00010880623,0.000015898016,0.00007628465,0.00007963904,0.00004715456],"domain_scores_gemma":[0.9995709,0.00017647097,0.00008755989,0.000028068254,0.000104582025,0.000032378044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076334144,0.0006839053,0.0008053074,0.00021269055,0.00035231447,0.0007662935,0.0011206601,0.0007869431,0.0012948774],"category_scores_gemma":[0.0011802365,0.00027139075,0.00044181902,0.00021191547,0.00056571496,0.00060169224,0.0007300093,0.000889473,0.00020278868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023987484,0.000031721604,0.00031938386,0.00004069232,0.00003145674,0.000078346646,0.00003562575,0.9780015,0.0011214471,0.00657766,0.00042252333,0.01331559],"study_design_scores_gemma":[0.0000055522537,0.000017820872,0.000033197193,0.0000019773586,0.0000039153456,0.0000066821704,0.0000030383947,0.9985538,0.00015391405,0.00100413,0.00021388625,0.0000020763882],"about_ca_topic_score_codex":0.00435144,"about_ca_topic_score_gemma":0.0033964687,"teacher_disagreement_score":0.00435144,"about_ca_system_score_codex":0.0006432606,"about_ca_system_score_gemma":0.0009541338,"threshold_uncertainty_score":0.00865221},"labels":[],"label_agreement":null},{"id":"W4391425506","doi":"10.1016/j.segan.2024.101294","title":"Evaluation of regression models and Bayes-Ensemble Regressor technique for non-intrusive load monitoring","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Agence Nationale de la Recherche","keywords":"Regression; Regression analysis; Computer science; Ensemble learning; Naive Bayes classifier; Predictive modelling; Bayesian probability; Machine learning; Energy consumption; Data mining; Bayes' theorem; Engineering; Artificial intelligence; Statistics; Support vector machine; Mathematics","score_opus":0.011915652650549042,"score_gpt":0.25063980687804643,"score_spread":0.2387241542274974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391425506","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14099835,0.0010893513,0.8534324,0.00025227806,0.00010959541,0.00006769908,0.00021812868,0.0019257748,0.0019064307],"genre_scores_gemma":[0.83131534,0.00047679013,0.16451944,0.00008283585,0.000065107466,0.00007733192,0.0006692574,0.00015439407,0.0026395293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984908,0.00078042276,0.0000696874,0.00022454429,0.00034083123,0.00009378788],"domain_scores_gemma":[0.9956599,0.0029864723,0.00013848172,0.0002516878,0.00090350176,0.000059983202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005297496,0.0010244665,0.0011590029,0.00057447125,0.00031841305,0.00074140343,0.0011496105,0.0009277398,0.001478302],"category_scores_gemma":[0.009500797,0.00031355754,0.0006207958,0.00052570057,0.00019217141,0.0014037811,0.00060035725,0.0009913595,0.00046811337],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005924736,0.00027854348,0.0063559534,0.000117303454,0.00023998944,0.000056387737,0.000065249435,0.6852216,0.004310931,0.0028415609,0.0022401125,0.2976798],"study_design_scores_gemma":[0.0000032217738,0.000021878268,0.00031361222,0.0000025418024,0.000009770822,0.0000054099546,0.000003610453,0.9989039,0.00048535192,0.00017692361,0.000071452654,0.0000023364473],"about_ca_topic_score_codex":0.010543289,"about_ca_topic_score_gemma":0.009694069,"teacher_disagreement_score":0.010543289,"about_ca_system_score_codex":0.00047498257,"about_ca_system_score_gemma":0.00080976164,"threshold_uncertainty_score":0.02801615},"labels":[],"label_agreement":null},{"id":"W4391468282","doi":"10.1109/etfg55873.2023.10407492","title":"Optimum Cost and Eco-Friendly Power Management in a Micro-Grid, Based on Multi-Agent Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Renewable energy; Computer science; Grid; Hyperparameter; Turbine; Wind power; Environmentally friendly; Reliability engineering; Control engineering; Automotive engineering; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.011098612881159214,"score_gpt":0.21990456877202,"score_spread":0.2088059558908608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391468282","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052509215,0.000423413,0.9405604,0.00036645052,0.00005120716,0.00007662549,0.000025992136,0.00023908737,0.0057475837],"genre_scores_gemma":[0.9602783,0.00015632583,0.03791568,0.000065467546,0.000022714914,0.00008706811,0.000019229643,0.000017720718,0.0014375249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979895,0.000068310386,0.0000081651215,0.00004359649,0.000049494476,0.000031428666],"domain_scores_gemma":[0.99956435,0.00023243221,0.00008988038,0.000021878102,0.00006121522,0.000030239527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004850187,0.00053539686,0.0006156505,0.0002243847,0.00024863513,0.000682892,0.0006552975,0.0005506003,0.0009834442],"category_scores_gemma":[0.001201621,0.00021467946,0.00029413713,0.00019917572,0.00059401465,0.0005472954,0.00051711843,0.00056626654,0.00013144953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002582507,0.000027704195,0.00039661443,0.000029033414,0.000019106206,0.00005447962,0.000018966291,0.98394114,0.0008504355,0.003934632,0.00026832538,0.01043375],"study_design_scores_gemma":[0.000005678369,0.000016356673,0.00005371557,0.0000020212854,0.000002867439,0.000005834093,0.0000031725858,0.99870145,0.00011252594,0.000976818,0.00011798006,0.0000015238385],"about_ca_topic_score_codex":0.0030052916,"about_ca_topic_score_gemma":0.0030650059,"teacher_disagreement_score":0.0030052916,"about_ca_system_score_codex":0.00053579226,"about_ca_system_score_gemma":0.00071843877,"threshold_uncertainty_score":0.005975604},"labels":[],"label_agreement":null},{"id":"W4391495579","doi":"10.1109/etfg55873.2023.10407462","title":"Stochastic Physics-Informed Deep Generative Network Scenario Generation: Application on Responsive Residential Load Management","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Generative grammar; Computer science; Artificial intelligence","score_opus":0.015920304563067297,"score_gpt":0.23333715880854258,"score_spread":0.2174168542454753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391495579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12461383,0.0005338201,0.8644514,0.0009892668,0.00009353884,0.00005413726,0.00032298532,0.0006730636,0.008267944],"genre_scores_gemma":[0.98268455,0.00012590319,0.01526573,0.00010478113,0.000019922885,0.000025860805,0.0001727384,0.000042400294,0.001558188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998324,0.00007075322,0.0000046603877,0.00003439215,0.000029732068,0.000028053704],"domain_scores_gemma":[0.9996314,0.00022150246,0.00003665372,0.000026140879,0.00005278579,0.000031479787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006023418,0.00064522936,0.00041211396,0.00021894653,0.0001616176,0.00038379125,0.0007503112,0.0006128983,0.0016439017],"category_scores_gemma":[0.0012153884,0.00025804972,0.00038481556,0.00032265822,0.0004284867,0.00059744495,0.00061732094,0.00083978876,0.00016109418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013169213,0.0000065752533,0.00021117915,0.0000064672477,0.000004579633,0.000022065264,0.0000056954455,0.99528116,0.0001917523,0.0014788727,0.0002362921,0.0025422312],"study_design_scores_gemma":[8.5090045e-7,0.00000291639,0.00003535187,5.014604e-7,7.355058e-7,0.000003055016,0.0000012835782,0.9991364,0.000061786835,0.0007031709,0.000053192314,8.645244e-7],"about_ca_topic_score_codex":0.006507108,"about_ca_topic_score_gemma":0.0077354205,"teacher_disagreement_score":0.006507108,"about_ca_system_score_codex":0.00081134273,"about_ca_system_score_gemma":0.00048760534,"threshold_uncertainty_score":0.01293844},"labels":[],"label_agreement":null},{"id":"W4391495584","doi":"10.1109/etfg55873.2023.10408549","title":"Load Demand Forecasting in Smart Microgrid Using NWP via Feature Engineering","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Microgrid; Feature engineering; Computer science; Feature (linguistics); Demand forecasting; Meteorology; Engineering; Operations research; Artificial intelligence; Deep learning","score_opus":0.016510820527891688,"score_gpt":0.19549638843107503,"score_spread":0.17898556790318335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391495584","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21460077,0.00012679023,0.779657,0.00029454712,0.000052136034,0.000037931688,0.00027873376,0.00069311354,0.0042590075],"genre_scores_gemma":[0.97215414,0.00006419885,0.026346909,0.000022871169,0.00001349426,0.000030456773,0.00012796895,0.000021346674,0.0012187102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999491,0.000010597014,0.000002836469,0.000014418796,0.000015216886,0.000007784851],"domain_scores_gemma":[0.99989796,0.000050008453,0.000013403526,0.00000960556,0.000025046984,0.000004043018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001595534,0.00027314553,0.00038312137,0.00013364806,0.00014208812,0.0003325136,0.00035793433,0.00024481284,0.00064055226],"category_scores_gemma":[0.0005561668,0.00015717333,0.0002353563,0.00022152261,0.00013553939,0.00054523215,0.00023183647,0.00038366046,0.00014830948],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018893437,0.000021123698,0.0014603381,0.00001439606,0.000011282346,0.000052154417,0.000013998802,0.9754794,0.0011017503,0.0016145627,0.00032419397,0.01988791],"study_design_scores_gemma":[4.433243e-7,0.000002663944,0.00010843226,4.3038756e-7,5.966889e-7,0.0000019359102,9.945692e-7,0.9994215,0.000088491564,0.0003019076,0.00007207113,5.4768776e-7],"about_ca_topic_score_codex":0.005876092,"about_ca_topic_score_gemma":0.0064370134,"teacher_disagreement_score":0.005876092,"about_ca_system_score_codex":0.00023546875,"about_ca_system_score_gemma":0.00025583516,"threshold_uncertainty_score":0.011683762},"labels":[],"label_agreement":null},{"id":"W4391508096","doi":"10.1007/978-981-99-9785-5_30","title":"Multi-agent Reinforcement Learning Based User-Centric Demand Response with Non-intrusive Load Monitoring","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Reinforcement learning; Demand response; On demand; Reinforcement; Human–computer interaction; Artificial intelligence; Real-time computing; Multimedia; Electrical engineering","score_opus":0.009654344786332087,"score_gpt":0.21503461895704865,"score_spread":0.20538027417071655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391508096","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08596811,0.00031712124,0.9055514,0.00025274165,0.00012934956,0.0001088272,0.000062777406,0.0015654007,0.006044287],"genre_scores_gemma":[0.97740984,0.00003561996,0.020787502,0.000051122446,0.000020622112,0.00004288473,0.000028476432,0.000030544867,0.0015933232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995223,0.00013722018,0.000025103158,0.00012355357,0.00011138412,0.00008031846],"domain_scores_gemma":[0.998949,0.0005452533,0.0001558167,0.000089999114,0.00017879524,0.00008127401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086425117,0.0006440523,0.0010823053,0.0002574118,0.00033965844,0.0007625271,0.0014598721,0.00063665584,0.0016014439],"category_scores_gemma":[0.0014678346,0.00035769452,0.00030200672,0.00028827865,0.0004112163,0.00059638906,0.00093789876,0.00091981515,0.0003314097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003740509,0.000318524,0.0007642917,0.00007399081,0.00006342231,0.00015043066,0.00007004962,0.91067225,0.007383243,0.0022033073,0.0018455782,0.076080956],"study_design_scores_gemma":[0.0000069384714,0.000022689683,0.00007190384,8.745512e-7,0.000002470911,0.0000090743615,0.0000022811257,0.99929595,0.00030117438,0.00021974079,0.00006493729,0.0000019632753],"about_ca_topic_score_codex":0.003084906,"about_ca_topic_score_gemma":0.003498355,"teacher_disagreement_score":0.003084906,"about_ca_system_score_codex":0.00052903354,"about_ca_system_score_gemma":0.00053458253,"threshold_uncertainty_score":0.0061338544},"labels":[],"label_agreement":null},{"id":"W4391707732","doi":"10.1016/j.apenergy.2024.122770","title":"Exergy-driven optimal operation of virtual energy station based on coordinated cooperative and Stackelberg games","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Chinese Society for Electrical Engineering; Jiangsu Association for Science and Technology; Southeast University; National Natural Science Foundation of China; Canada School of Energy and Environment","keywords":"Stackelberg competition; Computer science; Scheduling (production processes); Demand response; Mathematical optimization; Game theory; Electricity; Operations research; Economics; Microeconomics; Engineering; Mathematics","score_opus":0.004993320735950774,"score_gpt":0.19219647367417914,"score_spread":0.18720315293822837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391707732","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14022887,0.00019671749,0.84163815,0.0003055072,0.00008151898,0.000088141685,0.00008370257,0.00015158662,0.017225904],"genre_scores_gemma":[0.9918799,0.000044184424,0.0058646025,0.000019330784,0.0000075408047,0.000041610077,0.000021070016,0.000011943347,0.0021097786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995459,0.00013422806,0.000015828507,0.00007763918,0.000103761406,0.000122598],"domain_scores_gemma":[0.9995048,0.0002453985,0.000060248272,0.000026110312,0.00009530593,0.00006812832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008788535,0.0008628548,0.0015672335,0.00044046307,0.0005298579,0.0015950683,0.0012868292,0.00089185766,0.0023877248],"category_scores_gemma":[0.00133096,0.00053528056,0.0007858246,0.00043327658,0.0009467856,0.0010794351,0.001239548,0.00074102305,0.00018698515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073701725,0.000021976835,0.0001627608,0.000018595338,0.000019082538,0.00004181654,0.000022627535,0.9884548,0.0008826609,0.00802938,0.00017484614,0.0020978036],"study_design_scores_gemma":[0.000005024285,0.000019959047,0.000039849838,9.93027e-7,0.0000046847704,0.0000037807715,0.000006241159,0.9978356,0.00012443276,0.0019035697,0.000053366897,0.0000023999958],"about_ca_topic_score_codex":0.0071802465,"about_ca_topic_score_gemma":0.0053061135,"teacher_disagreement_score":0.0071802465,"about_ca_system_score_codex":0.0009742388,"about_ca_system_score_gemma":0.0014484898,"threshold_uncertainty_score":0.014276922},"labels":[],"label_agreement":null},{"id":"W4391896204","doi":"10.1016/j.segan.2024.101324","title":"Distributed stochastic energy coordination for residential prosumers: Framework and implementation","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Distributed generation; Distributed computing; Environmental economics; Renewable energy; Economics; Engineering; Electrical engineering","score_opus":0.0032639367734747515,"score_gpt":0.22122579579892346,"score_spread":0.2179618590254487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391896204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013838474,0.000080053935,0.97933674,0.0003874164,0.00004945361,0.00008081303,0.000060050104,0.00033319407,0.0058338987],"genre_scores_gemma":[0.8758638,0.00012898374,0.11986705,0.000096537224,0.000057052534,0.00018419893,0.00007431302,0.000052576353,0.003675611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985316,0.0004945477,0.000065647175,0.00030365746,0.0004261154,0.00017846793],"domain_scores_gemma":[0.99879336,0.00055007805,0.000117416865,0.00014263768,0.00030160596,0.000094848336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025320132,0.0006307184,0.0011024169,0.0003218505,0.0007592327,0.0019056858,0.0022026824,0.001257779,0.0033323888],"category_scores_gemma":[0.0037298542,0.0003912122,0.0006016504,0.00056293176,0.0010632242,0.001406659,0.0019059143,0.001177468,0.0003731857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005473805,0.000068064815,0.00034576812,0.000032561817,0.000022386348,0.00007087022,0.000059015052,0.8797044,0.0006816618,0.10375659,0.0009883798,0.014215509],"study_design_scores_gemma":[0.000013149584,0.000015060179,0.000036961872,0.0000027100996,0.000004686943,0.000009983548,0.000012288022,0.9862953,0.00019200062,0.0128765395,0.000537371,0.000003982543],"about_ca_topic_score_codex":0.0063485187,"about_ca_topic_score_gemma":0.008171627,"teacher_disagreement_score":0.0063485187,"about_ca_system_score_codex":0.0015615998,"about_ca_system_score_gemma":0.0029037653,"threshold_uncertainty_score":0.0133907795},"labels":[],"label_agreement":null},{"id":"W4391921073","doi":"10.37256/jeee.3120244132","title":"A Novel Design of a Low-Cost SCADA System for Monitoring Standalone Photovoltaic Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"SCADA; Photovoltaic system; Computer science; Embedded system; Flexibility (engineering); Reliability engineering; Real-time computing; Systems engineering; Engineering; Electrical engineering","score_opus":0.00967066357316659,"score_gpt":0.201922518610816,"score_spread":0.1922518550376494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391921073","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040602315,0.0003948801,0.935591,0.00045864092,0.00032205853,0.00047615627,0.0002649563,0.006364062,0.015525924],"genre_scores_gemma":[0.75639135,0.00027046626,0.22461073,0.0003432718,0.0001918052,0.0006137228,0.00022720655,0.00013899484,0.017212385],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994036,0.000086802684,0.000042673913,0.0001809596,0.00024572932,0.000040155817],"domain_scores_gemma":[0.9995865,0.000038885177,0.000061372244,0.000059665832,0.00021689155,0.000036637117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024180156,0.0007053837,0.0005532923,0.0005437964,0.00055655016,0.00088166574,0.0015737067,0.0007196969,0.0038412116],"category_scores_gemma":[0.0004505876,0.00040224203,0.0003423238,0.00029709414,0.00023172176,0.0007093462,0.00043221161,0.0005093589,0.0022171354],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055329094,0.00040748686,0.0060730423,0.00077612925,0.00017657058,0.0016335833,0.00074810866,0.030086175,0.42378694,0.014452589,0.017775021,0.50353104],"study_design_scores_gemma":[0.0002669496,0.0032155663,0.008582378,0.00018315585,0.00027091202,0.0040176795,0.00015748419,0.6374271,0.17232813,0.0031844461,0.1701958,0.00017044153],"about_ca_topic_score_codex":0.0010529888,"about_ca_topic_score_gemma":0.0013504422,"teacher_disagreement_score":0.0038412116,"about_ca_system_score_codex":0.00044613352,"about_ca_system_score_gemma":0.0005013143,"threshold_uncertainty_score":0.012850165},"labels":[],"label_agreement":null},{"id":"W4391972335","doi":"10.32920/25234747.v1","title":"Cloud-based Smart Dual Fuel Switching System (SDFSS) of Hybrid Residential HVAC System for Simultaneous Reduction of Energy Cost and Greenhouse Gas Emission","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"HVAC; Greenhouse gas; Renewable energy; Environmental science; Automotive engineering; Hybrid system; Heating system; Fossil fuel; Air conditioning; Environmental economics; Engineering; Waste management; Computer science; Electrical engineering","score_opus":0.009225042815494798,"score_gpt":0.21230809844535817,"score_spread":0.20308305562986337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391972335","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79266787,0.00054905575,0.18846382,0.00025176638,0.0001595734,0.00017176295,0.00031867466,0.0011507834,0.016266791],"genre_scores_gemma":[0.9957377,0.000046816873,0.0035133257,0.000015397087,0.0000032811126,0.0000113397255,0.000027025822,0.000004301321,0.00064069487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99991417,0.000016265525,0.0000035743844,0.000020691301,0.000025968699,0.000019276187],"domain_scores_gemma":[0.99990666,0.000029498913,0.000014831161,0.00001232009,0.000024782865,0.000011921833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014098616,0.00025409026,0.00020202134,0.0001255071,0.00021591011,0.00030746535,0.0004796864,0.0001744036,0.0019733647],"category_scores_gemma":[0.0001585104,0.000074424606,0.00023210187,0.00014552374,0.00016287286,0.00032814537,0.00024705732,0.00021622592,0.00016081423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013765979,0.00053511915,0.007701621,0.00032269864,0.00011434693,0.00032349545,0.000093629904,0.7563785,0.07487439,0.00643308,0.0036766035,0.14817004],"study_design_scores_gemma":[0.000048584745,0.00021795198,0.0014855686,0.000005965739,0.000022546436,0.000035935762,0.000021005771,0.9826378,0.013451138,0.0005811105,0.0014857521,0.000006740112],"about_ca_topic_score_codex":0.0056095175,"about_ca_topic_score_gemma":0.0062608267,"teacher_disagreement_score":0.0056095175,"about_ca_system_score_codex":0.00046644197,"about_ca_system_score_gemma":0.0003693531,"threshold_uncertainty_score":0.011153698},"labels":[],"label_agreement":null},{"id":"W4391980774","doi":"10.32920/25234747","title":"Cloud-based Smart Dual Fuel Switching System (SDFSS) of Hybrid Residential HVAC System for Simultaneous Reduction of Energy Cost and Greenhouse Gas Emission","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"HVAC; Greenhouse gas; Cloud computing; Reduction (mathematics); Dual (grammatical number); Environmental science; Automotive engineering; Computer science; Environmental economics; Engineering; Air conditioning; Operating system; Mechanical engineering; Economics","score_opus":0.009225042815494798,"score_gpt":0.21230809844535817,"score_spread":0.20308305562986337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391980774","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79266787,0.00054905575,0.18846382,0.00025176638,0.0001595734,0.00017176295,0.00031867466,0.0011507834,0.016266791],"genre_scores_gemma":[0.9957377,0.000046816873,0.0035133257,0.000015397087,0.0000032811126,0.0000113397255,0.000027025822,0.000004301321,0.00064069487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99991417,0.000016265525,0.0000035743844,0.000020691301,0.000025968699,0.000019276187],"domain_scores_gemma":[0.99990666,0.000029498913,0.000014831161,0.00001232009,0.000024782865,0.000011921833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014098616,0.00025409026,0.00020202134,0.0001255071,0.00021591011,0.00030746535,0.0004796864,0.0001744036,0.0019733647],"category_scores_gemma":[0.0001585104,0.000074424606,0.00023210187,0.00014552374,0.00016287286,0.00032814537,0.00024705732,0.00021622592,0.00016081423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013765979,0.00053511915,0.007701621,0.00032269864,0.00011434693,0.00032349545,0.000093629904,0.7563785,0.07487439,0.00643308,0.0036766035,0.14817004],"study_design_scores_gemma":[0.000048584745,0.00021795198,0.0014855686,0.000005965739,0.000022546436,0.000035935762,0.000021005771,0.9826378,0.013451138,0.0005811105,0.0014857521,0.000006740112],"about_ca_topic_score_codex":0.0056095175,"about_ca_topic_score_gemma":0.0062608267,"teacher_disagreement_score":0.0056095175,"about_ca_system_score_codex":0.00046644197,"about_ca_system_score_gemma":0.0003693531,"threshold_uncertainty_score":0.011153698},"labels":[],"label_agreement":null},{"id":"W4392079320","doi":"10.32920/25266610.v1","title":"Fuzzy Optimization Model of an Incremental Capacity Auction Formulation with GHG Consideration","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Greenhouse gas; Electricity generation; Renewable energy; Capacity optimization; Minification; Mathematical optimization; Reduction (mathematics); Computer science; Environmental science; Environmental economics; Economics; Power (physics); Mathematics; Engineering","score_opus":0.0240268497238232,"score_gpt":0.21086280815448968,"score_spread":0.18683595843066647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392079320","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09480153,0.0011575334,0.8384774,0.0019397788,0.00017024914,0.00025974674,0.0011491571,0.00021963065,0.061825022],"genre_scores_gemma":[0.9055116,0.00056497776,0.067865714,0.0002635597,0.00006562196,0.0004181691,0.00044038674,0.000043020344,0.024826897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971646,0.00009335761,0.000010729783,0.00006565886,0.00006112454,0.000052599913],"domain_scores_gemma":[0.99940085,0.00038383625,0.00005496381,0.000017998005,0.00010674795,0.00003569459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009985346,0.00082334684,0.0008099149,0.0005066041,0.00042092058,0.0017638325,0.0011801561,0.0017288357,0.006977586],"category_scores_gemma":[0.0014945327,0.00048290173,0.0009715909,0.00053067313,0.00072952587,0.00071134896,0.00062572764,0.0012723465,0.00043140876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030289097,0.000016905691,0.00017658892,0.000028531986,0.000013281393,0.00005914491,0.000017164237,0.9872743,0.0002919049,0.009279693,0.00045834132,0.0023538575],"study_design_scores_gemma":[0.000007863359,0.000010884395,0.000059817263,0.000004474212,0.0000053884846,0.000005850344,0.000008126063,0.9976903,0.00006636763,0.0018809007,0.00025697355,0.000003079512],"about_ca_topic_score_codex":0.026316244,"about_ca_topic_score_gemma":0.012655502,"teacher_disagreement_score":0.026316244,"about_ca_system_score_codex":0.0016184279,"about_ca_system_score_gemma":0.0018364273,"threshold_uncertainty_score":0.052326143},"labels":[],"label_agreement":null},{"id":"W4392081835","doi":"10.32920/25266610","title":"Fuzzy Optimization Model of an Incremental Capacity Auction Formulation with GHG Consideration","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Greenhouse gas; Capacity optimization; Electricity generation; Renewable energy; Mathematical optimization; Minification; Environmental economics; Computer science; Environmental science; Economics; Power (physics); Mathematics; Engineering","score_opus":0.0240268497238232,"score_gpt":0.21086280815448968,"score_spread":0.18683595843066647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392081835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09480153,0.0011575334,0.8384774,0.0019397788,0.00017024914,0.00025974674,0.0011491571,0.00021963065,0.061825022],"genre_scores_gemma":[0.9055116,0.00056497776,0.067865714,0.0002635597,0.00006562196,0.0004181691,0.00044038674,0.000043020344,0.024826897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971646,0.00009335761,0.000010729783,0.00006565886,0.00006112454,0.000052599913],"domain_scores_gemma":[0.99940085,0.00038383625,0.00005496381,0.000017998005,0.00010674795,0.00003569459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009985346,0.00082334684,0.0008099149,0.0005066041,0.00042092058,0.0017638325,0.0011801561,0.0017288357,0.006977586],"category_scores_gemma":[0.0014945327,0.00048290173,0.0009715909,0.00053067313,0.00072952587,0.00071134896,0.00062572764,0.0012723465,0.00043140876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030289097,0.000016905691,0.00017658892,0.000028531986,0.000013281393,0.00005914491,0.000017164237,0.9872743,0.0002919049,0.009279693,0.00045834132,0.0023538575],"study_design_scores_gemma":[0.000007863359,0.000010884395,0.000059817263,0.000004474212,0.0000053884846,0.000005850344,0.000008126063,0.9976903,0.00006636763,0.0018809007,0.00025697355,0.000003079512],"about_ca_topic_score_codex":0.026316244,"about_ca_topic_score_gemma":0.012655502,"teacher_disagreement_score":0.026316244,"about_ca_system_score_codex":0.0016184279,"about_ca_system_score_gemma":0.0018364273,"threshold_uncertainty_score":0.052326143},"labels":[],"label_agreement":null},{"id":"W4392094980","doi":"10.1007/s10994-024-06514-1","title":"Correction to: Multi-agent reinforcement learning for fast-timescale demand response of residential loads","year":2024,"lang":"en","type":"article","venue":"Machine Learning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université de Montréal; Polytechnique Montréal; Mila - Quebec Artificial Intelligence Institute","funders":"","keywords":"Reinforcement learning; Computer science; Reinforcement; Demand response; Artificial intelligence; Engineering; Structural engineering; Electrical engineering","score_opus":0.00856574228745731,"score_gpt":0.2416009840240008,"score_spread":0.2330352417365435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392094980","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005323092,0.0007154861,0.005603533,0.03971852,0.9483635,0.00004344019,0.0018175914,0.0014516575,0.0017539931],"genre_scores_gemma":[0.13808464,0.006420574,0.033958085,0.07849834,0.47129774,0.0005090665,0.0071192095,0.004079845,0.26003245],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99637705,0.00054648623,0.0006664407,0.0007950816,0.001199837,0.00041506081],"domain_scores_gemma":[0.95871526,0.011488639,0.0018878725,0.0035574809,0.022450224,0.0019004486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030251544,0.0024710968,0.0032246413,0.00298602,0.0026362839,0.003290184,0.0048460257,0.009054562,0.12570164],"category_scores_gemma":[0.07613273,0.0011400894,0.0016960987,0.0033796018,0.0022753456,0.0029971404,0.0031242676,0.00883451,0.053098027],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013091143,0.000020631536,0.00026951425,0.0002323575,0.000044687113,0.00048479033,0.00007078918,0.0008259961,0.00018161372,0.00262651,0.98301876,0.01209351],"study_design_scores_gemma":[0.00029205796,0.00009478741,0.0031641803,0.00035557247,0.00006885468,0.0014284006,0.0003026225,0.015923576,0.0020409445,0.012358825,0.96375006,0.00022018458],"about_ca_topic_score_codex":0.012156516,"about_ca_topic_score_gemma":0.011509961,"teacher_disagreement_score":0.12570164,"about_ca_system_score_codex":0.0034561043,"about_ca_system_score_gemma":0.0033037676,"threshold_uncertainty_score":0.42051387},"labels":[],"label_agreement":null},{"id":"W4392139346","doi":"10.1016/j.apenergy.2024.122883","title":"A distributed VPP-integrated co-optimization framework for energy scheduling, frequency regulation, and voltage support using data-driven distributionally robust optimization with Wasserstein metric","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Robust optimization; Mathematical optimization; Metric (unit); Scheduling (production processes); Computer science; Demand response; Voltage; Engineering; Electricity; Electrical engineering; Mathematics; Operations management","score_opus":0.017243124842313235,"score_gpt":0.22882907111807432,"score_spread":0.21158594627576108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392139346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031242392,0.00008656389,0.99427986,0.00010177438,0.000021382155,0.00002134711,0.000029199475,0.00008555416,0.0022500756],"genre_scores_gemma":[0.71804744,0.00033328845,0.27316317,0.00017497281,0.000076372344,0.0003536772,0.00024038008,0.00018652956,0.007424132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992667,0.00028270984,0.000028173888,0.00014825606,0.00018463474,0.00008943726],"domain_scores_gemma":[0.9994424,0.00025032792,0.00007518817,0.000042180516,0.00013554937,0.000054316242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014763998,0.0013989133,0.0011032342,0.00040760284,0.00037059656,0.0014460965,0.0015130895,0.0010973634,0.0023231935],"category_scores_gemma":[0.0016420207,0.0005410928,0.0009249265,0.00058572553,0.0009402382,0.0010585261,0.0020565612,0.0015670902,0.0003516898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016114556,0.000013937876,0.00009881762,0.000024688696,0.000019067906,0.000037396432,0.000017662329,0.98006564,0.0005118262,0.013439016,0.00035406768,0.005401888],"study_design_scores_gemma":[0.0000028179886,0.000012403206,0.000014825057,0.0000016696459,0.0000022325123,0.000003853108,0.0000032670507,0.99670714,0.00007799523,0.0029100308,0.0002617295,0.0000020113805],"about_ca_topic_score_codex":0.005549617,"about_ca_topic_score_gemma":0.004209529,"teacher_disagreement_score":0.005549617,"about_ca_system_score_codex":0.0009901418,"about_ca_system_score_gemma":0.0017022971,"threshold_uncertainty_score":0.011034608},"labels":[],"label_agreement":null},{"id":"W4392152135","doi":"10.1109/tpwrs.2024.3369591","title":"Physics-Guided Multi-Agent Adversarial Reinforcement Learning for Robust Active Voltage Control With Peer-to-Peer (P2P) Energy Trading","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; McGill University; Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Adversarial system; Peer-to-peer; Computer science; Energy (signal processing); Control (management); Computer security; Distributed computing; Artificial intelligence; Physics","score_opus":0.019221710220685806,"score_gpt":0.22577662580230973,"score_spread":0.20655491558162392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392152135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028410345,0.0003531379,0.96726125,0.00027354562,0.0000614607,0.000029790568,0.000027607428,0.0002969168,0.0032860276],"genre_scores_gemma":[0.9779067,0.00010734775,0.019782193,0.000115502466,0.000021503767,0.00006217428,0.000035331872,0.000026188247,0.0019430984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972016,0.00007350931,0.000011585606,0.00006814065,0.00007422829,0.000052409934],"domain_scores_gemma":[0.9993674,0.00036681962,0.000092714596,0.00003579559,0.000094336625,0.000042930384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006480995,0.00080650847,0.00084528123,0.00021179326,0.00031004215,0.0005882151,0.00093237346,0.0007675626,0.0013493462],"category_scores_gemma":[0.001689302,0.00034685276,0.0004334631,0.00018785527,0.00082261756,0.0005448771,0.0011039637,0.0012660815,0.00017564306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021470298,0.0000151223985,0.00022250768,0.000018369125,0.000015156935,0.000041223302,0.00001692624,0.9880116,0.00081891846,0.003881206,0.00029636145,0.0066412017],"study_design_scores_gemma":[0.0000020123775,0.0000064784144,0.000018003062,7.7511584e-7,0.0000011540561,0.0000024079286,9.301115e-7,0.99915934,0.000065895125,0.0006850901,0.000056837875,0.0000010793486],"about_ca_topic_score_codex":0.005430502,"about_ca_topic_score_gemma":0.00394373,"teacher_disagreement_score":0.005430502,"about_ca_system_score_codex":0.00065434916,"about_ca_system_score_gemma":0.00084488664,"threshold_uncertainty_score":0.010797739},"labels":[],"label_agreement":null},{"id":"W4392165424","doi":"10.21203/rs.3.rs-3970938/v1","title":"Centralized Smart Energy Monitoring System for Legacy Home Appliances","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Applied Science Private University","keywords":"Business; Embedded system; Computer security; Computer science; Telecommunications","score_opus":0.052502293782971526,"score_gpt":0.33857388978911496,"score_spread":0.2860715960061434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392165424","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3315561,0.0007013998,0.5981322,0.00065724703,0.0004026708,0.0002928294,0.001149564,0.030672312,0.036435597],"genre_scores_gemma":[0.97990155,0.00004080647,0.012708524,0.00006820672,0.00007672989,0.000035853744,0.00030025071,0.000087591354,0.00678042],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929345,0.000078431985,0.000025059475,0.0003235895,0.00019457548,0.00008492708],"domain_scores_gemma":[0.999432,0.00006562202,0.00005474367,0.00020467132,0.00019564696,0.00004732946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042566442,0.0005073207,0.0008541649,0.0005430145,0.0007619159,0.0011512043,0.0012358633,0.00042608724,0.008588867],"category_scores_gemma":[0.0005451758,0.00030302597,0.00016046439,0.00057947694,0.00029782526,0.000877434,0.000642151,0.0004574025,0.0017263539],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002720583,0.0012752053,0.0134692555,0.00022187107,0.00018972445,0.00053614896,0.00037254483,0.09073877,0.15958266,0.012163343,0.055879653,0.6628502],"study_design_scores_gemma":[0.00032902005,0.00038103855,0.012390111,0.000023362487,0.00012041751,0.00027567658,0.00012940529,0.91160357,0.05384477,0.006093019,0.014757184,0.0000525225],"about_ca_topic_score_codex":0.003858707,"about_ca_topic_score_gemma":0.005641178,"teacher_disagreement_score":0.008588867,"about_ca_system_score_codex":0.0010749584,"about_ca_system_score_gemma":0.0010169215,"threshold_uncertainty_score":0.028732657},"labels":[],"label_agreement":null},{"id":"W4392255272","doi":"10.1145/3638209.3638211","title":"Assessing the Effectiveness of Supervised and Semi-supervised NILM Approaches in an Industrial Context","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Machine learning; Artificial intelligence; Context (archaeology); Supervised learning; Artificial neural network; Energy consumption; Data mining; Regression analysis; Engineering","score_opus":0.09404407097871972,"score_gpt":0.26418843302516887,"score_spread":0.17014436204644914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392255272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70734257,0.0050169956,0.26659372,0.0010911387,0.0005521709,0.00056788884,0.0019445075,0.0058455486,0.011045593],"genre_scores_gemma":[0.9057719,0.0004113643,0.08874387,0.00022044212,0.00010379585,0.00015801791,0.002657849,0.00011980934,0.0018130455],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964743,0.0014987286,0.00025909947,0.00081131805,0.0006618811,0.00029464302],"domain_scores_gemma":[0.98968667,0.005633135,0.0009229904,0.0013416067,0.0020268352,0.00038877953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067431596,0.0016132179,0.0012114206,0.0018381281,0.0008179176,0.0013373704,0.0017973448,0.0016626131,0.0009112787],"category_scores_gemma":[0.0138674425,0.0002615791,0.0008802762,0.0008790931,0.0009568581,0.002401202,0.0015396923,0.0014167554,0.0007402922],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002141025,0.0016892154,0.038743474,0.0009390461,0.0007441772,0.00023027936,0.0003678717,0.39872193,0.0056395666,0.002186983,0.010881932,0.5377145],"study_design_scores_gemma":[0.00005425341,0.0005385021,0.009402752,0.0000688647,0.00006065169,0.00012542144,0.00025897275,0.98001087,0.0057868958,0.0020596203,0.0015934313,0.000039721766],"about_ca_topic_score_codex":0.0038323435,"about_ca_topic_score_gemma":0.0056100977,"teacher_disagreement_score":0.0067431596,"about_ca_system_score_codex":0.00083724316,"about_ca_system_score_gemma":0.0012139197,"threshold_uncertainty_score":0.035661697},"labels":[],"label_agreement":null},{"id":"W4392309966","doi":"10.2139/ssrn.4743225","title":"Using a Ledger to Facilitate Autonomous Peer-to-Peer Virtual Net Metering of Solar Pho-Tovoltaic Distributed Generation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Net metering; Ledger; Metering mode; Net (polyhedron); Peer-to-peer; Distributed ledger; Computer science; Distributed computing; Distributed generation; Computer network; Computer security; Blockchain; Electrical engineering; Business; Engineering; Mathematics; Mechanical engineering; Renewable energy; Finance","score_opus":0.03792992162289332,"score_gpt":0.2524994389524632,"score_spread":0.21456951732956986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392309966","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12731788,0.00017392304,0.7770662,0.0005212792,0.00060078886,0.0005441311,0.0003164985,0.06793599,0.02552329],"genre_scores_gemma":[0.88881046,0.000060388535,0.093168385,0.00021500853,0.00007079046,0.00015818983,0.00030516266,0.00090046343,0.016311157],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99922025,0.00019839463,0.00004627285,0.00021006873,0.0002295605,0.00009550249],"domain_scores_gemma":[0.9982987,0.0005579999,0.000081465696,0.00062667497,0.00021341011,0.00022174469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010076938,0.00049078255,0.00060014817,0.0006573225,0.0007292086,0.0016414595,0.0017447486,0.001155489,0.01100937],"category_scores_gemma":[0.0034085875,0.00036360984,0.00021739036,0.00038607244,0.0006316782,0.0018005078,0.0029559026,0.0011170976,0.0033285443],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003820853,0.0014936492,0.008754581,0.0004580618,0.00015989841,0.002202806,0.0026834456,0.06762933,0.23967148,0.036054563,0.043090574,0.5939806],"study_design_scores_gemma":[0.00044149967,0.00068288716,0.0023715894,0.00005106505,0.000055381548,0.0005491204,0.00031412087,0.7684255,0.14404523,0.016285636,0.06664763,0.00013044133],"about_ca_topic_score_codex":0.00088211574,"about_ca_topic_score_gemma":0.0013104797,"teacher_disagreement_score":0.01100937,"about_ca_system_score_codex":0.00048167983,"about_ca_system_score_gemma":0.00061249797,"threshold_uncertainty_score":0.036830008},"labels":[],"label_agreement":null},{"id":"W4392389636","doi":"10.1109/isgt59692.2024.10454125","title":"Frequency Dynamics-aware Real-time Marginal Pricing of Electricity Under Uncertainty","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Dynamics (music); Electricity pricing; Computer science; Econometrics; Electricity market; Economics; Electrical engineering; Engineering; Physics","score_opus":0.005442729601090557,"score_gpt":0.20220159470559182,"score_spread":0.19675886510450127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392389636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020428566,0.000103882514,0.97704643,0.000097833195,0.00003745085,0.000019509287,0.000022771133,0.00016716096,0.0020763301],"genre_scores_gemma":[0.94277465,0.00009063003,0.0556796,0.000030060435,0.000044285327,0.00002567011,0.00003365582,0.000059351827,0.0012620982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999335,0.00024331624,0.00002429032,0.000093949384,0.0002166871,0.000086733],"domain_scores_gemma":[0.99929464,0.0004165278,0.00007767365,0.00007887569,0.00009490173,0.000037279595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093338545,0.00058952783,0.0007751269,0.00026728192,0.00029927975,0.0011411079,0.0013423555,0.00048952503,0.0015890592],"category_scores_gemma":[0.003490161,0.00041278728,0.0004726591,0.00038823648,0.0006133392,0.0015941899,0.00070026587,0.0010111362,0.00018373919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000540054,0.00001775303,0.00027139092,0.000016928398,0.000014742896,0.000051809544,0.00003246725,0.9655734,0.0011696051,0.017001068,0.0003285434,0.015468308],"study_design_scores_gemma":[0.0000014608873,0.0000051184184,0.000032836022,5.868695e-7,0.0000013399402,0.000008388639,0.0000017576282,0.99802953,0.00014852948,0.001661868,0.00010649743,0.0000020641617],"about_ca_topic_score_codex":0.002646444,"about_ca_topic_score_gemma":0.0027574967,"teacher_disagreement_score":0.002646444,"about_ca_system_score_codex":0.0007658996,"about_ca_system_score_gemma":0.001044882,"threshold_uncertainty_score":0.0055570602},"labels":[],"label_agreement":null},{"id":"W4392472105","doi":"10.3390/su16052156","title":"Residential Prosumer Energy Management System with Renewable Integration Considering Multi-Energy Storage and Demand Response","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Prosumer; Demand response; Renewable energy; Environmental economics; Energy storage; Energy management; Energy engineering; Business; Variable renewable energy; Energy (signal processing); Environmental science; Natural resource economics; Electricity; Engineering; Economics; Electrical engineering; Power (physics)","score_opus":0.005096912801047532,"score_gpt":0.2042120312595261,"score_spread":0.19911511845847857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392472105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57728034,0.0007524168,0.36026555,0.0008074645,0.00019805902,0.00047553415,0.00042800873,0.002557433,0.05723516],"genre_scores_gemma":[0.98900795,0.000066480265,0.007911085,0.00005809166,0.000014554916,0.00007499732,0.00005170945,0.000014295945,0.00280097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997265,0.00007983872,0.000021074447,0.000058919028,0.00007038093,0.000043224103],"domain_scores_gemma":[0.9998627,0.000032436332,0.000021536982,0.000015786452,0.000048243794,0.000019292778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043401754,0.00078952324,0.00096525083,0.00034399095,0.00090154813,0.0014096837,0.0013387576,0.00090566825,0.0029650696],"category_scores_gemma":[0.00029925178,0.00039957117,0.0005003714,0.0004041419,0.000276464,0.0010130994,0.0008067925,0.0005854632,0.0005704285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046476605,0.00048177294,0.0025935057,0.00015354418,0.0001280481,0.00069867,0.0001116226,0.9411309,0.009442831,0.003894346,0.0020558685,0.0388442],"study_design_scores_gemma":[0.000023607497,0.00011951855,0.0002920534,0.000005721651,0.000025760779,0.00003546532,0.000027562452,0.9971533,0.0011327433,0.0006696022,0.00050560635,0.000009012587],"about_ca_topic_score_codex":0.005227999,"about_ca_topic_score_gemma":0.009358423,"teacher_disagreement_score":0.005227999,"about_ca_system_score_codex":0.00069127104,"about_ca_system_score_gemma":0.0008182961,"threshold_uncertainty_score":0.010395169},"labels":[],"label_agreement":null},{"id":"W4392481354","doi":"10.1016/j.aej.2024.02.033","title":"Smart home energy management systems: Research challenges and survey","year":2024,"lang":"en","type":"article","venue":"Alexandria Engineering Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architectural engineering; Environmental resource management; Computer science; Environmental science; Environmental economics; Geography; Business; Engineering; Economics","score_opus":0.04289504293394584,"score_gpt":0.2468280231368012,"score_spread":0.20393298020285536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392481354","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071544647,0.9402512,0.023849804,0.0051363385,0.0006105038,0.00008015784,0.00009898333,0.000121082754,0.022697536],"genre_scores_gemma":[0.04961796,0.92750734,0.01625051,0.0008307539,0.0011033586,0.000059220558,0.00022091501,0.000025797612,0.004384128],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999283,0.00013759495,0.00009835484,0.00012416436,0.00029629635,0.000060629798],"domain_scores_gemma":[0.9981456,0.00092211424,0.00014027636,0.000094767114,0.00061120733,0.00008604945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016754925,0.0006566221,0.0009465597,0.0029291916,0.0005712841,0.0030913388,0.00096328114,0.0015808202,0.0024623135],"category_scores_gemma":[0.001847499,0.0005906124,0.0005684505,0.0048924373,0.00065171404,0.006037544,0.0009717237,0.0013899701,0.0008521837],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006192417,0.00019222854,0.0029634798,0.0052524554,0.000061898725,0.00017205621,0.00031961963,0.008343245,0.0012670724,0.040106963,0.011916089,0.92934304],"study_design_scores_gemma":[0.000019752773,0.0006997079,0.007276686,0.009021931,0.00014927983,0.0016848437,0.00279134,0.057282336,0.002280002,0.05957223,0.8590729,0.0001489701],"about_ca_topic_score_codex":0.0015797406,"about_ca_topic_score_gemma":0.0018142564,"teacher_disagreement_score":0.0030913388,"about_ca_system_score_codex":0.00084905024,"about_ca_system_score_gemma":0.0012424126,"threshold_uncertainty_score":0.008860946},"labels":[],"label_agreement":null},{"id":"W4392529864","doi":"10.1016/j.egyr.2024.03.001","title":"Smart energy management using green computing","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Energy management; Green computing; Computer science; Energy (signal processing); Telecommunications; Cloud computing; Physics; Operating system","score_opus":0.008322181093252615,"score_gpt":0.201999650344287,"score_spread":0.19367746925103438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392529864","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0672003,0.007545414,0.3042402,0.021935815,0.0056889495,0.00022722063,0.00083087705,0.0050035445,0.5873277],"genre_scores_gemma":[0.8482109,0.0070307576,0.061229885,0.0015485045,0.00092593825,0.00008185028,0.0006588717,0.0005182005,0.079795234],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995845,0.00009367069,0.000013905283,0.00003589123,0.00022224682,0.000049801532],"domain_scores_gemma":[0.999374,0.00017141718,0.000054724092,0.00018114278,0.0001701567,0.00004862929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006734623,0.00046460438,0.00028730268,0.00096986146,0.00040914756,0.002498663,0.00050405867,0.0006246724,0.007938513],"category_scores_gemma":[0.0013682331,0.00015224614,0.0003118169,0.0014931138,0.0006582428,0.0027574769,0.0011315672,0.0010741027,0.0016865011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018612406,0.0003315559,0.0027507902,0.00020794552,0.000083714294,0.00018195056,0.00018224091,0.0355902,0.009982487,0.39757356,0.083481126,0.46944833],"study_design_scores_gemma":[0.000038143422,0.00015858028,0.003498932,0.0002043366,0.00006437737,0.0001593156,0.00052226917,0.19598784,0.029479649,0.43519017,0.33463323,0.00006321914],"about_ca_topic_score_codex":0.0014709297,"about_ca_topic_score_gemma":0.0027264836,"teacher_disagreement_score":0.007938513,"about_ca_system_score_codex":0.00080418476,"about_ca_system_score_gemma":0.00075764843,"threshold_uncertainty_score":0.026556969},"labels":[],"label_agreement":null},{"id":"W4392628588","doi":"10.26868/25222708.2023.1175","title":"Using surrogate modelling and stochastic optimization for optimal day-ahead demand response strategies under weather uncertainty","year":2023,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Robustness (evolution); Computer science; HVAC; Flexibility (engineering); Mathematical optimization; Surrogate model; Renewable energy; Stochastic programming; Stochastic optimization; Electricity; Air conditioning; Engineering; Machine learning; Mathematics","score_opus":0.06472494548077462,"score_gpt":0.2980382211994312,"score_spread":0.23331327571865657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392628588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021756716,0.00023134945,0.97328466,0.00024230627,0.000046521607,0.0000379042,0.00007650757,0.00015051039,0.0041735996],"genre_scores_gemma":[0.87650347,0.00034731135,0.11918711,0.000119546545,0.000049176757,0.0002528998,0.0003050426,0.00014770715,0.0030877276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935704,0.00036446817,0.000026156345,0.000050588413,0.00013550781,0.0000662057],"domain_scores_gemma":[0.9977642,0.0017128484,0.00018531235,0.00007325028,0.00019939805,0.00006499289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017704084,0.0011693093,0.0014656486,0.0005814429,0.00042776988,0.0014078029,0.0006384325,0.0015691426,0.0017989427],"category_scores_gemma":[0.0041521606,0.0007666686,0.001209826,0.00073027436,0.00076298614,0.0009118614,0.0010963071,0.0014344095,0.00023086391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008525828,0.00000509963,0.00004433339,0.000007961223,0.000005957735,0.000006077419,0.0000036226754,0.99761176,0.00009644253,0.0013411324,0.00004538684,0.00082370685],"study_design_scores_gemma":[0.0000012120865,0.000003536452,0.000008077267,0.000001211994,6.7016975e-7,9.261335e-7,9.603073e-7,0.99946684,0.0000314677,0.0004450018,0.000039151546,0.0000010413265],"about_ca_topic_score_codex":0.00537251,"about_ca_topic_score_gemma":0.0032952637,"teacher_disagreement_score":0.00537251,"about_ca_system_score_codex":0.0008369695,"about_ca_system_score_gemma":0.0014366726,"threshold_uncertainty_score":0.010682523},"labels":[],"label_agreement":null},{"id":"W4392728966","doi":"10.1016/j.ijhydene.2024.03.073","title":"A two-stage risk-based framework for dynamic configuration of a renewable-based distribution system considering demand response programs and hydrogen storage systems","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Hydrogen storage; Demand response; Renewable energy; Stage (stratigraphy); Computer science; Environmental economics; Hydrogen; Chemistry; Economics; Electrical engineering; Engineering","score_opus":0.009511977770583957,"score_gpt":0.24110193558194104,"score_spread":0.23158995781135708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392728966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010055528,0.0002731247,0.98202044,0.00032263537,0.000046486333,0.00011626621,0.00012873535,0.00025036812,0.0067863585],"genre_scores_gemma":[0.8781958,0.00039399948,0.10977619,0.00012493586,0.00008975599,0.00034743964,0.00025098142,0.00015495154,0.0106659625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979571,0.0007439488,0.00008968743,0.0003450566,0.0004825618,0.0003816399],"domain_scores_gemma":[0.998063,0.0009535824,0.00023802042,0.00011892416,0.00043751986,0.00018887558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037181585,0.0019207251,0.0022276668,0.0013187589,0.0009486588,0.0036009056,0.004313869,0.0030380432,0.009441319],"category_scores_gemma":[0.0045077084,0.0015303595,0.0017862822,0.0010493026,0.0015454943,0.0031060614,0.0031879887,0.0021994787,0.0007355697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032811015,0.000021113408,0.00022581509,0.000038498678,0.000029981546,0.000121361234,0.000043090167,0.9781214,0.00033750926,0.017227754,0.0002824633,0.003518155],"study_design_scores_gemma":[0.000006478688,0.000013543318,0.000057551337,0.0000063588404,0.000012511017,0.00001411298,0.000009832173,0.9949616,0.000085218235,0.004632016,0.00019295226,0.000007875368],"about_ca_topic_score_codex":0.014984497,"about_ca_topic_score_gemma":0.011381409,"teacher_disagreement_score":0.014984497,"about_ca_system_score_codex":0.0023779913,"about_ca_system_score_gemma":0.0030407754,"threshold_uncertainty_score":0.031584322},"labels":[],"label_agreement":null},{"id":"W4392778117","doi":"10.1016/j.epsr.2024.110266","title":"Optimal robust collaborative management of multiple EHs in power systems by utilizing the game theory","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Game theory; Electric power system; Computer science; Power (physics); Operations research; Mathematical economics; Engineering; Economics; Physics","score_opus":0.022268170380434486,"score_gpt":0.2775658957792706,"score_spread":0.2552977253988361,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392778117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022826884,0.00024315469,0.97008485,0.0002929908,0.000057399142,0.000056455923,0.000033558623,0.000068760375,0.0063359165],"genre_scores_gemma":[0.9732667,0.00017235124,0.023119193,0.00007976927,0.000047895373,0.00008680171,0.000025595578,0.000026099558,0.0031757029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832577,0.0005925942,0.00006152946,0.00032646637,0.00032819543,0.00036538029],"domain_scores_gemma":[0.99736446,0.0018213021,0.00023409212,0.000098607925,0.00034359336,0.0001379581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020582068,0.0014368205,0.0021394591,0.00060860475,0.00085996516,0.002364579,0.0019880475,0.0017285354,0.002494985],"category_scores_gemma":[0.005513602,0.00077725196,0.0009880809,0.0007081466,0.001847478,0.0025087616,0.0022584512,0.0015518706,0.00024419764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007394736,0.00003773132,0.00015210682,0.000050363702,0.000048324993,0.000082200764,0.000059834332,0.9688677,0.0012917531,0.02350763,0.00042600688,0.005402451],"study_design_scores_gemma":[0.000008181036,0.000022885277,0.000035622408,0.000003502586,0.000008739442,0.000010458536,0.000012700712,0.99404114,0.00014851562,0.0055999015,0.00010229792,0.000006136722],"about_ca_topic_score_codex":0.0054468336,"about_ca_topic_score_gemma":0.0040726997,"teacher_disagreement_score":0.0054468336,"about_ca_system_score_codex":0.0014589953,"about_ca_system_score_gemma":0.0014333595,"threshold_uncertainty_score":0.010885},"labels":[],"label_agreement":null},{"id":"W4392942907","doi":"10.1109/icetsis61505.2024.10459405","title":"Distributed Energy Sources Management using Shuffled Frog-Leaping Algorithm for Optimizing the Environmental and Economic Indices of Smart Microgrid","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Microgrid; Computer science; Distributed generation; Energy management; Energy (signal processing); Algorithm; Distributed computing; Engineering; Artificial intelligence; Electrical engineering; Renewable energy; Mathematics; Control (management); Statistics","score_opus":0.006820541349946087,"score_gpt":0.18705933317360937,"score_spread":0.18023879182366329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392942907","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09151052,0.0005856055,0.89796627,0.00025690664,0.000056020453,0.00011017451,0.000066521425,0.00036529053,0.009082773],"genre_scores_gemma":[0.86709505,0.00021724941,0.12753642,0.000090933696,0.000014224003,0.0002610877,0.00010003299,0.000050700055,0.0046341815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985826,0.00006229925,0.0000061190694,0.000022382477,0.000027012791,0.000023911156],"domain_scores_gemma":[0.99973315,0.00014498843,0.000034925983,0.000014277469,0.00005107748,0.00002157983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053846167,0.0006627767,0.0008162133,0.00046499472,0.0004760841,0.00074783305,0.0006868607,0.0008200723,0.0019703412],"category_scores_gemma":[0.0009372499,0.0003315965,0.00060877844,0.00043026864,0.00039590773,0.00048068425,0.00056666933,0.00053900084,0.00019378973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017191036,0.00001953879,0.00029489063,0.000016771599,0.0000196422,0.000027647606,0.000017096962,0.9907612,0.00047806124,0.0012797634,0.00022777953,0.0068403664],"study_design_scores_gemma":[0.0000049197856,0.00001550055,0.000039821978,0.0000022177494,0.0000026889513,0.0000049227183,0.0000047485205,0.99914646,0.00009595867,0.00054215145,0.00013864948,0.0000019195895],"about_ca_topic_score_codex":0.0054063415,"about_ca_topic_score_gemma":0.004861575,"teacher_disagreement_score":0.0054063415,"about_ca_system_score_codex":0.0005668735,"about_ca_system_score_gemma":0.0008473086,"threshold_uncertainty_score":0.010749757},"labels":[],"label_agreement":null},{"id":"W4393233726","doi":"10.18280/mmep.110323","title":"Techno-Economic Modeling of Hybrid PV-Hydroelectric Generator Systems in Semarang","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Generator (circuit theory); Environmental science; Automotive engineering; Electrical engineering; Business; Computer science; Engineering; Physics; Power (physics)","score_opus":0.011736903515391604,"score_gpt":0.175523211686721,"score_spread":0.1637863081713294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393233726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7477664,0.0012100663,0.16751622,0.00122665,0.000159417,0.000112305475,0.00064688013,0.0003556338,0.08100646],"genre_scores_gemma":[0.9910772,0.00016710434,0.001768377,0.000022443657,0.000010867855,0.000028206981,0.00007003147,0.000027407174,0.006828337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998559,0.0000685691,0.0000053549124,0.000021233005,0.000022805534,0.000026116195],"domain_scores_gemma":[0.9998591,0.00008082384,0.0000135594055,0.00000680406,0.000026390207,0.00001327212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030535215,0.00044042149,0.0009303697,0.00035135588,0.00060230674,0.0017170707,0.00081495434,0.0012318621,0.002555138],"category_scores_gemma":[0.0004369048,0.00035891106,0.0006505201,0.00063333364,0.00060897775,0.00086734234,0.0006274409,0.00072179764,0.0003128114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020021764,0.000014092485,0.00032605618,0.000010440685,0.000008942723,0.00009219344,0.00001531234,0.9937802,0.00032125472,0.004129826,0.00013850702,0.0011431512],"study_design_scores_gemma":[0.0000040800414,0.000009673417,0.00018231089,0.0000018779889,0.0000033961715,0.000009275391,0.000017319655,0.9983376,0.00007204826,0.0011617388,0.00019799249,0.0000026723849],"about_ca_topic_score_codex":0.02329315,"about_ca_topic_score_gemma":0.018547146,"teacher_disagreement_score":0.02329315,"about_ca_system_score_codex":0.0012214106,"about_ca_system_score_gemma":0.0008073524,"threshold_uncertainty_score":0.046315134},"labels":[],"label_agreement":null},{"id":"W4393681622","doi":"10.1016/j.egyr.2024.03.048","title":"Modelling tools for the assessment of Renewable Energy Communities","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ministry of Science and Technology, Taiwan; Ministero dell’Istruzione, dell’Università e della Ricerca","keywords":"Renewable energy; Environmental economics; Workflow; Energy transition; Process (computing); Energy supply; Energy planning; Environmental impact assessment; Computer science; Environmental resource management; Energy (signal processing); Risk analysis (engineering); Business; Engineering; Economics","score_opus":0.03036272602809191,"score_gpt":0.242858702149083,"score_spread":0.21249597612099108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393681622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004051252,0.002472806,0.9570535,0.00068415975,0.00016581279,0.00029908586,0.0028142682,0.0030468684,0.02941235],"genre_scores_gemma":[0.14755562,0.0078969095,0.8210986,0.0002732449,0.00016846368,0.0016791922,0.0073942537,0.0013897433,0.012543957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979917,0.00074052095,0.00025698717,0.00016686614,0.0007452748,0.000098685945],"domain_scores_gemma":[0.9960974,0.0022388452,0.00032718378,0.0004780204,0.00076731475,0.000091324495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026103472,0.0015408803,0.0010358173,0.0044060997,0.00071317825,0.004087064,0.0023717473,0.0018795513,0.01128982],"category_scores_gemma":[0.008807836,0.00065515697,0.0024274173,0.0042326585,0.0007551591,0.0036143954,0.00292489,0.0013842883,0.0034746507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005280501,0.00009315621,0.0028489048,0.0019400866,0.00022211672,0.00030357018,0.0008344233,0.4955069,0.0022589928,0.32486096,0.016532276,0.1545458],"study_design_scores_gemma":[0.000039994175,0.00004521879,0.0008708268,0.00084932393,0.0000972035,0.00026044282,0.0005745435,0.5487575,0.0020676902,0.23617053,0.21016327,0.000103472485],"about_ca_topic_score_codex":0.0075191446,"about_ca_topic_score_gemma":0.007206021,"teacher_disagreement_score":0.01128982,"about_ca_system_score_codex":0.0013581804,"about_ca_system_score_gemma":0.0025067052,"threshold_uncertainty_score":0.037768185},"labels":[],"label_agreement":null},{"id":"W4393951502","doi":"10.1016/j.enbuild.2024.114130","title":"Time-series data clustering with load-shape preservation for identifying residential energy consumption behaviors","year":2024,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Science Foundation","keywords":"Cluster analysis; Baseline (sea); Computer science; Energy consumption; Identification (biology); Energy (signal processing); Energy demand; Data mining; Load profile; Demand response; Artificial intelligence; Machine learning; Pattern recognition (psychology); Engineering; Statistics; Mathematics; Environmental economics","score_opus":0.027104423855399563,"score_gpt":0.2524138863066543,"score_spread":0.22530946245125472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393951502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25311646,0.0007480387,0.7389253,0.00023444773,0.00013249808,0.000121553916,0.0017317873,0.0028875112,0.002102413],"genre_scores_gemma":[0.8845922,0.00029922664,0.10920277,0.000057283687,0.0001037233,0.00009646928,0.0038070004,0.00014582732,0.0016955319],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995566,0.00007076663,0.00003618593,0.00015897094,0.00010804742,0.00006936017],"domain_scores_gemma":[0.999141,0.00024648567,0.0001308455,0.00018785989,0.00023430365,0.000059443842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006713335,0.0006597115,0.0008106557,0.0025216257,0.0005315897,0.00065128715,0.00084133184,0.00058221706,0.000855886],"category_scores_gemma":[0.002144357,0.00018676011,0.0010938003,0.0031424,0.00035607012,0.0007135974,0.0006630679,0.0006043461,0.00078085175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011129999,0.00083953136,0.0454567,0.0001918059,0.00048284512,0.00023295684,0.00039057047,0.191292,0.02636864,0.0036987057,0.007005849,0.7229274],"study_design_scores_gemma":[0.000008711525,0.000052822023,0.012277618,0.000010152115,0.000044565564,0.0000816489,0.00014034395,0.9817137,0.0029053208,0.0017543237,0.0009893693,0.000021436123],"about_ca_topic_score_codex":0.009921035,"about_ca_topic_score_gemma":0.012302032,"teacher_disagreement_score":0.009921035,"about_ca_system_score_codex":0.0005005574,"about_ca_system_score_gemma":0.00071235676,"threshold_uncertainty_score":0.019726574},"labels":[],"label_agreement":null},{"id":"W4394564219","doi":"10.1016/j.enpol.2024.114083","title":"Digitalization of power distribution grids: Barrier analysis, ranking and policy recommendations","year":2024,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"H2020 Marie Skłodowska-Curie Actions; Horizon 2020; European Commission","keywords":"Electrification; Renewable energy; Software deployment; Smart grid; Decentralization; Environmental economics; Distribution (mathematics); Ranking (information retrieval); Energy policy; Risk analysis (engineering); Electricity; Business; Industrial organization; Process management; Computer science; Engineering; Economics","score_opus":0.004339138536262314,"score_gpt":0.23088392590927456,"score_spread":0.22654478737301226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394564219","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39574993,0.018408813,0.13765542,0.30257976,0.0011188318,0.0041560205,0.010403919,0.0011091962,0.12881812],"genre_scores_gemma":[0.8906237,0.011012436,0.08533854,0.0028355992,0.00012226038,0.0011748453,0.0029800732,0.00013128074,0.00578131],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99207944,0.0037174972,0.00055211916,0.00042686338,0.0021136652,0.001110532],"domain_scores_gemma":[0.9523197,0.030236822,0.0027011323,0.0013785447,0.0110879475,0.002275914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014614783,0.0011784941,0.0012958081,0.011725809,0.0023570107,0.009249445,0.0026577774,0.0021943634,0.01181704],"category_scores_gemma":[0.05005267,0.0004833802,0.0010932189,0.009737074,0.0017579265,0.009544355,0.003529645,0.0031307123,0.0010717416],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004580318,0.001126388,0.0849392,0.0076811705,0.00035143277,0.0009798706,0.008234675,0.031845182,0.0017252507,0.27639678,0.09317341,0.49308857],"study_design_scores_gemma":[0.00027536406,0.00058424834,0.09517315,0.017864715,0.0007432243,0.00061688916,0.2058263,0.12442559,0.005748296,0.3043476,0.24385506,0.00053961814],"about_ca_topic_score_codex":0.027992861,"about_ca_topic_score_gemma":0.0343371,"teacher_disagreement_score":0.027992861,"about_ca_system_score_codex":0.00805874,"about_ca_system_score_gemma":0.016211813,"threshold_uncertainty_score":0.07729125},"labels":[],"label_agreement":null},{"id":"W4394863209","doi":"10.1287/msom.2024.0989","title":"Managing Payment Flexibility in Rent-to-Own Contracts for Off-Grid Energy Products","year":2024,"lang":"en","type":"article","venue":"Manufacturing & Service Operations Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; University of Toronto","funders":"","keywords":"Download; Flexibility (engineering); Payment; Grid; Computer science; Business; World Wide Web; Computer security; Database; Internet privacy; Economics","score_opus":0.01307686131187908,"score_gpt":0.23046410798916298,"score_spread":0.2173872466772839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394863209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7696653,0.00042066857,0.18895593,0.0017470408,0.00023129635,0.00046900875,0.00027094927,0.0011251,0.03711475],"genre_scores_gemma":[0.9881272,0.00003105297,0.01037364,0.000050637034,0.0000133081885,0.000023012213,0.00005924147,0.000056241133,0.0012657243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9957973,0.0015003808,0.00026087507,0.00059934444,0.00093308894,0.00090907543],"domain_scores_gemma":[0.98777235,0.0070022866,0.0011023026,0.0017800538,0.00091867044,0.0014243758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007536641,0.0006399025,0.00080168847,0.0006859141,0.0021484809,0.0052645644,0.0026084662,0.0019144324,0.008344885],"category_scores_gemma":[0.02276836,0.0008235022,0.00060620334,0.0008876823,0.0012834918,0.00646454,0.0039294623,0.002541928,0.0008208073],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038973778,0.001624321,0.024456998,0.00018342212,0.00015105687,0.0018138384,0.0027328695,0.5630825,0.017063502,0.13006642,0.011430686,0.243497],"study_design_scores_gemma":[0.00010149462,0.00028846064,0.003797751,0.000040203216,0.000037617243,0.00026998823,0.0010728268,0.94168913,0.0032099483,0.043138135,0.006289741,0.00006480428],"about_ca_topic_score_codex":0.0024671825,"about_ca_topic_score_gemma":0.003512466,"teacher_disagreement_score":0.008344885,"about_ca_system_score_codex":0.0018627421,"about_ca_system_score_gemma":0.0018829877,"threshold_uncertainty_score":0.039857984},"labels":[],"label_agreement":null},{"id":"W4394937365","doi":"10.1109/icicacs60521.2024.10498184","title":"Renewable-Energy-System Applications of Ambiguous-Fuzzy-Hybrid-Averaging Operator","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Operator (biology); Computer science; Fuzzy logic; Artificial intelligence; Engineering; Electrical engineering; Chemistry","score_opus":0.004963512995048115,"score_gpt":0.18573601914346077,"score_spread":0.18077250614841267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394937365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025953108,0.00037853996,0.9641063,0.00018290494,0.000060437378,0.000023315242,0.000032606007,0.00012800207,0.009134757],"genre_scores_gemma":[0.91743225,0.00027034065,0.08112858,0.0000502905,0.000056756966,0.00002014105,0.000029282874,0.000008405316,0.0010038494],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940634,0.00017391596,0.00004877968,0.00008988159,0.00024749181,0.000033737888],"domain_scores_gemma":[0.99953675,0.0002143724,0.00008095536,0.000051024756,0.000096616,0.000020375217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089531747,0.00037855378,0.0003982746,0.00047131046,0.00039555124,0.00060731603,0.00039826013,0.00035566994,0.001118932],"category_scores_gemma":[0.0015927273,0.000076015225,0.00049211056,0.00045659332,0.00079343753,0.00094483915,0.0006142128,0.00047454637,0.00007755252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012913698,0.0000554282,0.0022039784,0.00034353737,0.000095516225,0.0010868033,0.0008123146,0.30620906,0.019293204,0.518132,0.0015270445,0.1501121],"study_design_scores_gemma":[0.00000832174,0.00008422633,0.0007757718,0.00003079991,0.000026497126,0.00036095647,0.00012967433,0.7803985,0.004940185,0.20834617,0.0048593567,0.000039522645],"about_ca_topic_score_codex":0.0010922706,"about_ca_topic_score_gemma":0.00088799105,"teacher_disagreement_score":0.001118932,"about_ca_system_score_codex":0.0003717673,"about_ca_system_score_gemma":0.00037453722,"threshold_uncertainty_score":0.004734993},"labels":[],"label_agreement":null},{"id":"W4394966972","doi":"10.1109/access.2024.3391298","title":"Maximum Reserved Capacity of Aggregated Electric Water Heaters Virtual Battery for Peak Management","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"National Research Council Canada","keywords":"Demand response; Computer science; News aggregator; Peaking power plant; Payback period; Grid; Model predictive control; Peak demand; Robustness (evolution); Automotive engineering; Control (management); Simulation; Reliability engineering; Electricity; Distributed generation; Engineering; Renewable energy; Electrical engineering","score_opus":0.0259502318880824,"score_gpt":0.24384653539104567,"score_spread":0.21789630350296327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394966972","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55955225,0.00066726987,0.425992,0.00020328633,0.00006604942,0.00006299006,0.0001677897,0.00061063736,0.012677755],"genre_scores_gemma":[0.9987431,0.000025845666,0.0009030449,0.0000042142947,0.0000021685673,0.0000057355082,0.000013494169,0.0000053809404,0.0002970714],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998204,0.000049917522,0.0000060825037,0.000030159825,0.00005806416,0.000035416913],"domain_scores_gemma":[0.99978834,0.00009480123,0.000028334407,0.000029174347,0.00004728298,0.000011991595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031768653,0.00040272318,0.00039798653,0.0003012223,0.00018895594,0.0009084797,0.0007190922,0.00027231267,0.0009197175],"category_scores_gemma":[0.0008678797,0.00017428707,0.00030260216,0.00023812494,0.00029201357,0.0009257614,0.00045551846,0.00031003388,0.00009532225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007938006,0.000020459483,0.00069403416,0.00004024543,0.000014583132,0.000064612264,0.000033212124,0.9783061,0.0049575865,0.0023952092,0.00024007903,0.013154556],"study_design_scores_gemma":[0.0000017615357,0.000018688974,0.00016339123,0.000002747459,0.000004149532,0.0000064360906,0.000011809694,0.9977864,0.0010953423,0.0007634094,0.00014304777,0.0000028576626],"about_ca_topic_score_codex":0.0037249634,"about_ca_topic_score_gemma":0.0034944075,"teacher_disagreement_score":0.0037249634,"about_ca_system_score_codex":0.00059589016,"about_ca_system_score_gemma":0.00046420394,"threshold_uncertainty_score":0.0074065328},"labels":[],"label_agreement":null},{"id":"W4395000085","doi":"10.1186/s42162-024-00334-2","title":"Centralized smart energy monitoring system for legacy home appliances","year":2024,"lang":"en","type":"article","venue":"Energy Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Applied Science Private University","keywords":"Architectural engineering; Computer science; Telecommunications; Embedded system; Business; Engineering","score_opus":0.009147898646612232,"score_gpt":0.2037617667272946,"score_spread":0.19461386808068237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395000085","genre_codex":"empirical","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5711395,0.0005150645,0.3854369,0.00035695176,0.00023392162,0.00043019414,0.00051258405,0.027681146,0.013693605],"genre_scores_gemma":[0.9858212,0.0000308403,0.011270493,0.000065380256,0.00002499649,0.000056873658,0.00012578804,0.000022969396,0.002581424],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999549,0.000064388914,0.00003450285,0.00019020145,0.00012018253,0.000041672356],"domain_scores_gemma":[0.99959606,0.00004197771,0.00006278632,0.00010607066,0.00016371459,0.000029401575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034268165,0.00043180888,0.0006721325,0.0004426227,0.00046863756,0.0006312997,0.0010475867,0.0003821746,0.0034227301],"category_scores_gemma":[0.0005346523,0.00017672962,0.00019935488,0.0003289974,0.0001922966,0.00055927254,0.00044231713,0.00026717415,0.0010300713],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001977604,0.0011377324,0.03991343,0.00047468065,0.00023601684,0.0016241843,0.0006504322,0.06643277,0.2885634,0.004472925,0.025417713,0.5690991],"study_design_scores_gemma":[0.0002355335,0.0007631781,0.023930442,0.00006016076,0.00016473653,0.0007236431,0.00015037415,0.8366408,0.12090982,0.0013037663,0.0150308125,0.000086724],"about_ca_topic_score_codex":0.0021351897,"about_ca_topic_score_gemma":0.001872979,"teacher_disagreement_score":0.0034227301,"about_ca_system_score_codex":0.00054572173,"about_ca_system_score_gemma":0.00045033896,"threshold_uncertainty_score":0.0114501715},"labels":[],"label_agreement":null},{"id":"W4395024794","doi":"10.1016/j.buildenv.2024.111548","title":"Occupant counting model development for urban building energy modeling using commercial off-the-shelf Wi-Fi sensing technology","year":2024,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Occupancy; Leverage (statistics); Scalability; Computer science; Building model; Efficient energy use; Energy modeling; Simulation; Engineering; Civil engineering; Machine learning; Database","score_opus":0.02004132057793894,"score_gpt":0.21562424902634056,"score_spread":0.1955829284484016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395024794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04213736,0.00017491961,0.9507515,0.00014009087,0.00004907022,0.00007978286,0.00077542977,0.0011780796,0.004713712],"genre_scores_gemma":[0.79013497,0.0004169372,0.19412488,0.0001397534,0.000054958353,0.00064396556,0.002397117,0.00024403175,0.011843345],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998627,0.000027485285,0.000008820478,0.00003647555,0.000041859726,0.000022747388],"domain_scores_gemma":[0.9998109,0.000082804174,0.000017561244,0.000015580374,0.00006109343,0.000012070173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035866429,0.0005725782,0.00044056826,0.00038537546,0.00028816625,0.00057702983,0.0013333948,0.0006655038,0.002738171],"category_scores_gemma":[0.0008297782,0.00033942718,0.00093331025,0.0003955518,0.00022301733,0.00043963606,0.000542271,0.0008427853,0.0007358235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000106580355,0.000019488321,0.0009544417,0.000017368087,0.000011663729,0.00002799542,0.000015187873,0.9871358,0.0005933805,0.0013915482,0.00044551797,0.009376881],"study_design_scores_gemma":[7.2868755e-7,0.0000026017824,0.000108144035,0.0000016580891,0.0000017616464,0.0000038966637,0.0000026461594,0.99915946,0.0001539773,0.00025934665,0.0003041815,0.0000016065463],"about_ca_topic_score_codex":0.021349616,"about_ca_topic_score_gemma":0.02298904,"teacher_disagreement_score":0.021349616,"about_ca_system_score_codex":0.0005822948,"about_ca_system_score_gemma":0.0009465011,"threshold_uncertainty_score":0.042450666},"labels":[],"label_agreement":null},{"id":"W4396214014","doi":"10.2316/j.2023.203-0473","title":"AN EVALUATION METHOD WITH MULTI-TECHNICAL INDICATORS FOR CAPACITY CONFIGURATION SCHEME OF THE ENERGY STORAGE SYSTEM AT USER SIDE BASING ON GAME TOPSIS, 1-7.","year":2023,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheme (mathematics); TOPSIS; Computer science; Energy storage; Reliability engineering; Energy (signal processing); Operations research; Engineering; Mathematics; Statistics","score_opus":0.020741740586345994,"score_gpt":0.273149640309087,"score_spread":0.252407899722741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396214014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048246577,0.00027697222,0.93417233,0.00015715633,0.000112477384,0.00069272047,0.0003682579,0.0006244255,0.01534902],"genre_scores_gemma":[0.6766502,0.00025364544,0.31564745,0.00003472804,0.000029223005,0.0008250506,0.00041523846,0.0000795708,0.0060648685],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962754,0.001584016,0.00020712441,0.0003398457,0.0013972893,0.00019637223],"domain_scores_gemma":[0.99773127,0.00084242877,0.00015898283,0.00011565055,0.0010673251,0.00008435579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039100405,0.0012440166,0.0007791199,0.0033088508,0.000917577,0.0021697558,0.0010405629,0.00064806314,0.0064566433],"category_scores_gemma":[0.0054252734,0.00029449575,0.0008542361,0.0022847555,0.0006878121,0.0018214615,0.0012382835,0.0005708405,0.0006593821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008479262,0.0005633255,0.019190282,0.0012390951,0.00029522888,0.00033928305,0.0011252916,0.25061843,0.021320097,0.048448723,0.008544899,0.64746743],"study_design_scores_gemma":[0.00006156798,0.00052832486,0.0063852835,0.00008445149,0.00013641984,0.00014175383,0.00081059587,0.96617323,0.009777009,0.011721066,0.0040961956,0.00008402282],"about_ca_topic_score_codex":0.006496352,"about_ca_topic_score_gemma":0.008277905,"teacher_disagreement_score":0.006496352,"about_ca_system_score_codex":0.001917594,"about_ca_system_score_gemma":0.0019781787,"threshold_uncertainty_score":0.02159965},"labels":[],"label_agreement":null},{"id":"W4396693934","doi":"10.3390/fi16050162","title":"BPET: A Unified Blockchain-Based Framework for Peer-to-Peer Energy Trading","year":2024,"lang":"en","type":"article","venue":"Future Internet","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"York University; University of Alberta","funders":"","keywords":"Blockchain; Computer science; Peer-to-peer; Distributed computing; Modular design; Energy market; Renewable energy; Smart contract; Energy (signal processing); Computer security; Operating system","score_opus":0.01035312953159516,"score_gpt":0.23291623171313258,"score_spread":0.2225631021815374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396693934","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046344306,0.00018403906,0.9863942,0.00020612794,0.000083859755,0.00029685875,0.0002075937,0.004367875,0.0036250867],"genre_scores_gemma":[0.37438065,0.0009770157,0.61069846,0.0002156868,0.0001194619,0.0010392015,0.0016696193,0.00076889293,0.010131032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985879,0.00036057743,0.00014780805,0.00019700946,0.00055093085,0.0001557078],"domain_scores_gemma":[0.9989749,0.0003120595,0.000098003686,0.0002416757,0.00021437516,0.00015895633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022458353,0.00064149406,0.00083554833,0.0007177229,0.0010265822,0.0020964216,0.0025072193,0.0013328063,0.0047911024],"category_scores_gemma":[0.0032692745,0.00052007986,0.00070830056,0.00081255863,0.001040652,0.0031747767,0.0023333016,0.0019063232,0.001544516],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005573963,0.0003671615,0.0021728014,0.0005845069,0.00017537364,0.0010808214,0.0005048408,0.51390404,0.015590976,0.22631411,0.016779477,0.22196841],"study_design_scores_gemma":[0.00008769917,0.000078269884,0.00017919128,0.00004127366,0.000020151927,0.00013839197,0.000030759275,0.918609,0.0041456805,0.04330076,0.033331282,0.00003754449],"about_ca_topic_score_codex":0.0070724026,"about_ca_topic_score_gemma":0.0063598384,"teacher_disagreement_score":0.0070724026,"about_ca_system_score_codex":0.00086725026,"about_ca_system_score_gemma":0.0029107265,"threshold_uncertainty_score":0.016027868},"labels":[],"label_agreement":null},{"id":"W4396697506","doi":"10.1051/e3sconf/202452305002","title":"Mixed-use neighbourhood to maximise urban energy community potential","year":2024,"lang":"en","type":"article","venue":"E3S Web of Conferences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Neighbourhood (mathematics); Geography; Environmental planning; Environmental science; Economic geography; Mathematics","score_opus":0.023358696998445568,"score_gpt":0.20881990168361572,"score_spread":0.18546120468517016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396697506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86493593,0.0003415207,0.058001194,0.00010570725,0.000035407433,0.00035874054,0.0011297108,0.0003829537,0.07470882],"genre_scores_gemma":[0.9699922,0.00007190161,0.020086315,0.000011241384,0.0000039838337,0.00016286332,0.00035364018,0.000059938127,0.009258011],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997197,0.0000828448,0.000011375415,0.000048482474,0.0000833966,0.000054191387],"domain_scores_gemma":[0.9998041,0.000046355024,0.000018186123,0.00003368777,0.00005637945,0.00004125324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002063721,0.000343104,0.00039386758,0.0005190203,0.00053286075,0.0010487644,0.00059230055,0.00030198455,0.010289671],"category_scores_gemma":[0.0006499487,0.00015273775,0.00028595843,0.0008124715,0.00022209807,0.0005348871,0.001276003,0.00015407956,0.0017111241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002283839,0.0017929446,0.13791925,0.0013097436,0.00037376652,0.0014330915,0.004982447,0.19988985,0.08157391,0.0560931,0.013485258,0.49886283],"study_design_scores_gemma":[0.00031003356,0.0027406225,0.27923936,0.0003549725,0.0005680578,0.0017026756,0.012483669,0.42167565,0.056875337,0.041520454,0.18227154,0.00025769236],"about_ca_topic_score_codex":0.0029787521,"about_ca_topic_score_gemma":0.016058188,"teacher_disagreement_score":0.010289671,"about_ca_system_score_codex":0.0004333183,"about_ca_system_score_gemma":0.00041792827,"threshold_uncertainty_score":0.034422398},"labels":[],"label_agreement":null},{"id":"W4396813774","doi":"10.1080/19401493.2024.2418813","title":"CityLearn v2: energy-flexible, resilient, occupant-centric, and carbon-aware management of grid-interactive communities","year":2024,"lang":"en","type":"preprint","venue":"Journal of Building Performance Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada; U.S. Department of Energy","keywords":"Computer science; Reinforcement learning; Grid; Flexibility (engineering); Distributed computing; Benchmarking; Energy management; Energy storage; Energy (signal processing); Power (physics); Artificial intelligence","score_opus":0.015183408863508054,"score_gpt":0.25912292762582145,"score_spread":0.2439395187623134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396813774","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22026825,0.001077016,0.4690342,0.0017977026,0.0008610505,0.0012334137,0.04825606,0.21095015,0.046522167],"genre_scores_gemma":[0.62020826,0.0004546699,0.28775707,0.0007886795,0.00006930611,0.0011498515,0.066830136,0.012062911,0.0106791565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993851,0.0001916278,0.00003124779,0.00015111215,0.00014244425,0.00009844785],"domain_scores_gemma":[0.99892336,0.00036381526,0.000055918295,0.0003034008,0.00017595162,0.00017740826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014622555,0.0011882795,0.00059050496,0.000480466,0.00058302283,0.0013477216,0.0028848313,0.0012051166,0.006491602],"category_scores_gemma":[0.0032460068,0.0007309626,0.0009630953,0.00067473686,0.0006802438,0.0017273994,0.003097549,0.0019901178,0.0022097668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010971208,0.0007418084,0.007836564,0.00063513196,0.00021130935,0.00024765282,0.00033947226,0.80064756,0.006086408,0.011621,0.1172306,0.053305354],"study_design_scores_gemma":[0.00028316665,0.000120600205,0.00083970506,0.000034884626,0.000016130694,0.000031646585,0.00006371277,0.9641349,0.005119397,0.00709574,0.022221263,0.000038958908],"about_ca_topic_score_codex":0.01768022,"about_ca_topic_score_gemma":0.03643191,"teacher_disagreement_score":0.01768022,"about_ca_system_score_codex":0.0010616877,"about_ca_system_score_gemma":0.0018961212,"threshold_uncertainty_score":0.03515464},"labels":[],"label_agreement":null},{"id":"W4396915180","doi":"10.2139/ssrn.4829677","title":"Deep Reinforcement Learning for Economic Battery Dispatch: A Comprehensive Comparison of Algorithms and Experiment Design Choices","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Economic dispatch; Computer science; Battery (electricity); Artificial intelligence; Machine learning; Reinforcement; Psychology; Power (physics); Social psychology; Electric power system","score_opus":0.022419806225838015,"score_gpt":0.2689997521670136,"score_spread":0.2465799459411756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396915180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3803948,0.0016463173,0.60911345,0.0011628481,0.00021096769,0.0009472271,0.000659614,0.00067704334,0.0051877564],"genre_scores_gemma":[0.8964522,0.00035452895,0.099978946,0.00024642196,0.000054227254,0.00084167067,0.00039551468,0.00008474496,0.0015918681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99181527,0.0066832956,0.0002577017,0.0005261308,0.00046859053,0.00024901173],"domain_scores_gemma":[0.92332137,0.069457,0.0014660214,0.0035607086,0.0016087972,0.0005861489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026612705,0.0011081151,0.0018893706,0.00054686854,0.00036970963,0.0011863931,0.0014827211,0.0018677436,0.0028680586],"category_scores_gemma":[0.051553693,0.0006475846,0.0009850407,0.00047497608,0.0010910876,0.002600301,0.0012576196,0.002182434,0.00027540224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01041789,0.0021165754,0.0049378127,0.0005537259,0.00083603035,0.000030215275,0.00009133608,0.8320848,0.0011593656,0.021438094,0.0015271202,0.124807104],"study_design_scores_gemma":[0.001261807,0.001350881,0.0013335494,0.000058220612,0.00020866451,0.0000157205,0.000022854334,0.9684665,0.0012620062,0.025335949,0.0006499648,0.00003375858],"about_ca_topic_score_codex":0.0020220927,"about_ca_topic_score_gemma":0.0017021188,"teacher_disagreement_score":0.026612705,"about_ca_system_score_codex":0.0016450213,"about_ca_system_score_gemma":0.0022222225,"threshold_uncertainty_score":0.14074308},"labels":[],"label_agreement":null},{"id":"W4398518877","doi":"10.7910/dvn/fie0s4/gf34zp","title":"Metering_S130hot.pdf","year":2016,"lang":"en","type":"dataset","venue":"Harvard Dataverse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Metering mode; Environmental science; Physics; Optics","score_opus":0.00934221406406491,"score_gpt":0.19715113558468805,"score_spread":0.18780892152062315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398518877","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007456959,0.000029543218,0.000047234833,0.0000410174,0.000015853677,0.000004836519,0.9985903,0.0005392664,0.0006573727],"genre_scores_gemma":[0.0004093252,0.00005641794,0.00013976324,0.000041514137,0.0000073579104,0.000027595443,0.9984049,0.00012905589,0.00078409567],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911577,0.00010297128,0.00012636148,0.00025477784,0.00023158951,0.00016860983],"domain_scores_gemma":[0.99773216,0.0005035128,0.00025729576,0.00075708434,0.00054640294,0.00020356332],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008362955,0.0023745028,0.0011214959,0.0040017357,0.0005518187,0.0027123052,0.001975178,0.0017798499,0.12203742],"category_scores_gemma":[0.0052256975,0.0009509329,0.0012184951,0.0075045195,0.0004151877,0.0020818135,0.001969147,0.0015087259,0.16688594],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037300993,0.000013450583,0.00067445636,0.00038667957,0.000016227146,0.0000141160135,0.000014397832,0.0002486682,0.0000692883,0.00031721633,0.9959996,0.0022088361],"study_design_scores_gemma":[0.00020513171,0.000018280138,0.004713757,0.0002738254,0.00002265612,0.000050361625,0.00007354499,0.00051170686,0.00045480393,0.001120034,0.9925258,0.000029926763],"about_ca_topic_score_codex":0.02506661,"about_ca_topic_score_gemma":0.03360676,"teacher_disagreement_score":0.8779626,"about_ca_system_score_codex":0.0013184915,"about_ca_system_score_gemma":0.0018220318,"threshold_uncertainty_score":0.40825582},"labels":[],"label_agreement":null},{"id":"W4398678094","doi":"10.7910/dvn/fie0s4/wjilsc","title":"Metering_DENTps18.pdf","year":2016,"lang":"en","type":"dataset","venue":"Harvard Dataverse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Metering mode; Computer science; Environmental science; Geography; Engineering; Mechanical engineering","score_opus":0.009465101456237145,"score_gpt":0.19831388395094013,"score_spread":0.188848782494703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398678094","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007890783,0.000027144368,0.000043292846,0.000039727747,0.000014143376,0.0000037445527,0.99892336,0.0003697287,0.0004997961],"genre_scores_gemma":[0.00039936745,0.000053839307,0.00011513114,0.00003277368,0.0000057334682,0.000024002426,0.99870694,0.0000845402,0.00057764124],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99891317,0.0001303457,0.00017380876,0.00029596503,0.00029870792,0.00018803426],"domain_scores_gemma":[0.99755716,0.0004926043,0.00032082293,0.0007734306,0.00065694377,0.0001990248],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009292053,0.0026191666,0.0011826582,0.00400058,0.0005743634,0.0026009814,0.0022892316,0.0018986516,0.07849488],"category_scores_gemma":[0.0058891755,0.0009757608,0.0012642756,0.008391739,0.00040062636,0.0021609971,0.0019156338,0.0015547867,0.1237405],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004039166,0.000012457744,0.00086030114,0.00037764624,0.000018270914,0.000015184478,0.000012756334,0.0003232185,0.00006695822,0.00035689876,0.9959162,0.0019998825],"study_design_scores_gemma":[0.00020546318,0.000017667653,0.0057938187,0.00026926128,0.000025753547,0.00005406168,0.00007139171,0.0006758239,0.00045193927,0.0011014487,0.9912998,0.000033484434],"about_ca_topic_score_codex":0.030230371,"about_ca_topic_score_gemma":0.034023542,"teacher_disagreement_score":0.9215051,"about_ca_system_score_codex":0.0015089802,"about_ca_system_score_gemma":0.002107642,"threshold_uncertainty_score":0.26259154},"labels":[],"label_agreement":null},{"id":"W4399247501","doi":"10.21203/rs.3.rs-4443849/v1","title":"Sinoatrial Node Cells Implementation by Low Cost Digital Hardware","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Sinoatrial node; Computer hardware; Node (physics); Computer science; Business; Engineering; Internal medicine; Medicine","score_opus":0.0317755841041335,"score_gpt":0.35098579443996364,"score_spread":0.31921021033583014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399247501","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1980558,0.0019175366,0.74333745,0.0015325157,0.0013083754,0.00031766956,0.00046837702,0.005338533,0.04772362],"genre_scores_gemma":[0.90107846,0.00045250895,0.08313066,0.00031568907,0.00018506461,0.00008082091,0.00019050902,0.00014909693,0.014417164],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997631,0.000046829617,0.000021394493,0.000051024577,0.00007291243,0.00004467627],"domain_scores_gemma":[0.9996983,0.00008576057,0.000028963037,0.00008460597,0.00007763946,0.00002483296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023516921,0.00047409217,0.00026847978,0.00029751423,0.0002425876,0.0014382633,0.0011027551,0.0005392889,0.017805148],"category_scores_gemma":[0.00073413056,0.00019589797,0.00024309027,0.00022382915,0.00023142148,0.0008435923,0.00039509393,0.00046361252,0.00227949],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019894766,0.0004830133,0.0049604047,0.00096990506,0.00027706768,0.0010484214,0.00030257707,0.025231045,0.38191295,0.03668381,0.017369539,0.5287719],"study_design_scores_gemma":[0.0012033215,0.0034478926,0.010132183,0.00028287133,0.0006017316,0.0040895585,0.0003865012,0.24477713,0.543407,0.017255422,0.17428324,0.0001331128],"about_ca_topic_score_codex":0.00074357534,"about_ca_topic_score_gemma":0.0019013499,"teacher_disagreement_score":0.017805148,"about_ca_system_score_codex":0.00043430476,"about_ca_system_score_gemma":0.00047073778,"threshold_uncertainty_score":0.059564173},"labels":[],"label_agreement":null},{"id":"W4399259911","doi":"10.1007/s12652-024-04814-x","title":"Non intrusive load monitoring using additive time series modeling via finite mixture models aggregation","year":2024,"lang":"en","type":"article","venue":"Journal of Ambient Intelligence and Humanized Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Series (stratigraphy); Computer science; Time series; Biological system; Machine learning; Geology","score_opus":0.02276864922019724,"score_gpt":0.24265709068974078,"score_spread":0.21988844146954353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399259911","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018046092,0.00019661427,0.98049253,0.00006882138,0.00007295843,0.000015473172,0.00005186391,0.0003656716,0.0006899089],"genre_scores_gemma":[0.8351698,0.00043739856,0.1600792,0.00010644213,0.00021908639,0.00008535502,0.00040660513,0.000114845796,0.0033812243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990815,0.0002743155,0.000056728393,0.0002411259,0.0002765324,0.00006986895],"domain_scores_gemma":[0.9987123,0.00076338364,0.00013762368,0.00016572712,0.00018434321,0.00003669091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010430367,0.0011116703,0.0014221395,0.00066837197,0.00037147096,0.0011613413,0.0012967879,0.0006212276,0.00068627903],"category_scores_gemma":[0.0028853377,0.0005772997,0.0011108483,0.0009875938,0.00032715424,0.0015637656,0.0012392517,0.0012564552,0.0003527344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039981367,0.0002715292,0.002701378,0.00013479436,0.00039649446,0.00015041571,0.00017245213,0.7374158,0.014864827,0.01234133,0.0018429011,0.22930835],"study_design_scores_gemma":[0.0000011124783,0.000010460455,0.00017179179,0.0000016330727,0.000010144549,0.000008003721,0.0000027921226,0.9981034,0.0004923135,0.0010670798,0.00012763123,0.000003547219],"about_ca_topic_score_codex":0.00247577,"about_ca_topic_score_gemma":0.0033343309,"teacher_disagreement_score":0.00247577,"about_ca_system_score_codex":0.0003416898,"about_ca_system_score_gemma":0.00044933855,"threshold_uncertainty_score":0.0055161715},"labels":[],"label_agreement":null},{"id":"W4399292696","doi":"10.3390/en17112705","title":"Self-Scheduling Virtual Power Plant for Peak Management","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Power management; Virtual power plant; Computer science; Environmental science; Power (physics); Electrical engineering; Engineering; Renewable energy; Physics; Distributed generation","score_opus":0.005192502602889111,"score_gpt":0.19121935819470312,"score_spread":0.186026855591814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399292696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053173266,0.00009603107,0.94136244,0.00006248832,0.00003484984,0.00005485286,0.0000516195,0.00058822235,0.004576249],"genre_scores_gemma":[0.9634188,0.000030965242,0.03554594,0.000014975542,0.000009517219,0.000026489211,0.000039667822,0.000030111742,0.00088352425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980384,0.00005955622,0.000006762658,0.000045862085,0.000052117248,0.000031877844],"domain_scores_gemma":[0.99977595,0.000078938516,0.000037950536,0.00004043699,0.000040490784,0.000026323543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003495767,0.00030350537,0.00037912064,0.00021241352,0.00029709216,0.0005512615,0.00068244204,0.00024957233,0.0020329065],"category_scores_gemma":[0.0005373514,0.00015682318,0.00023375617,0.00023194325,0.00028004698,0.0005218653,0.00046108037,0.00041668056,0.00022332798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009728066,0.00006509158,0.00063821854,0.000045672645,0.000020340034,0.000059718182,0.000043863933,0.9253199,0.009736206,0.010915682,0.0010707774,0.051987194],"study_design_scores_gemma":[0.0000042005636,0.000031290438,0.000115697425,0.0000015283205,0.000002948557,0.00001472049,0.000008408874,0.99545103,0.0014967035,0.002270679,0.0005997426,0.0000030338824],"about_ca_topic_score_codex":0.0011778157,"about_ca_topic_score_gemma":0.0021519656,"teacher_disagreement_score":0.0020329065,"about_ca_system_score_codex":0.00038961964,"about_ca_system_score_gemma":0.00074346445,"threshold_uncertainty_score":0.0068007708},"labels":[],"label_agreement":null},{"id":"W4399330307","doi":"10.1109/mele.2024.3385949","title":"Enhancing Distributed Energy Resource Integration and Supply Reliability: The Two-to-One rule","year":2024,"lang":"en","type":"article","venue":"IEEE Electrification Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Resource (disambiguation); Computer science; Distributed computing; Mathematical optimization; Engineering; Mathematics; Computer network; Physics","score_opus":0.006788984742883928,"score_gpt":0.20935961745848417,"score_spread":0.20257063271560025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399330307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018247794,0.0031663675,0.8762063,0.013619436,0.0011963939,0.00022350116,0.00010433146,0.0012291041,0.08600668],"genre_scores_gemma":[0.74971,0.003400839,0.21447968,0.004221853,0.0019363192,0.00049914164,0.00012129182,0.000658954,0.024971914],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9919728,0.0025074873,0.0004363329,0.0015909493,0.0028919964,0.0006004959],"domain_scores_gemma":[0.9820467,0.008156505,0.001388933,0.0043678037,0.0030664233,0.00097361504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0076979557,0.0012708264,0.0017489785,0.0013815877,0.001739814,0.006990838,0.0028572623,0.004615402,0.006859583],"category_scores_gemma":[0.02500691,0.0010760988,0.0010368263,0.0010937362,0.0060144784,0.0145353535,0.0064336965,0.006158228,0.0038339293],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002500019,0.00025351177,0.0016666221,0.00036514,0.0001308853,0.00049316656,0.00036135866,0.02401391,0.003298312,0.689466,0.020891825,0.2588094],"study_design_scores_gemma":[0.00018693053,0.00021418328,0.00063164247,0.00020679685,0.00008766632,0.0010698456,0.00013763898,0.07517568,0.0029238611,0.86983365,0.049431365,0.00010057475],"about_ca_topic_score_codex":0.0013121039,"about_ca_topic_score_gemma":0.001320313,"teacher_disagreement_score":0.0076979557,"about_ca_system_score_codex":0.0019619127,"about_ca_system_score_gemma":0.0019337723,"threshold_uncertainty_score":0.040711164},"labels":[],"label_agreement":null},{"id":"W4399331545","doi":"10.21203/rs.3.rs-4327177/v1","title":"Probabilistic deployment pathways of scaling up distributed green hydrogen systems for urban residential communities in North America","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Software deployment; Probabilistic logic; Scaling; Geography; Environmental science; Computer science; Mathematics; Artificial intelligence","score_opus":0.05944795207026895,"score_gpt":0.3031940740550446,"score_spread":0.24374612198477566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399331545","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9751041,0.00015725144,0.0143831,0.00086262514,0.00001802667,0.00012123159,0.0015133313,0.00014310576,0.007697143],"genre_scores_gemma":[0.9941784,0.000085556516,0.0034038965,0.000022781729,0.0000021968447,0.000031725336,0.00040787394,0.000014929486,0.0018525366],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994124,0.00022499324,0.000023314176,0.00010869145,0.00010594654,0.00012464044],"domain_scores_gemma":[0.9967558,0.0018161567,0.0003883973,0.00013668463,0.00067411613,0.00022885238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010248364,0.0002496761,0.00022072671,0.0008319137,0.0007308993,0.0012306542,0.0007097929,0.0006869628,0.004835211],"category_scores_gemma":[0.0044113677,0.00040446027,0.00032065116,0.0009642898,0.00062156044,0.0012797633,0.00082060625,0.0005535584,0.000252441],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056699506,0.00013999818,0.054611072,0.00011331106,0.00007678719,0.0004113153,0.00073008897,0.8730655,0.0025249482,0.03544549,0.0073054032,0.025009101],"study_design_scores_gemma":[0.0000377619,0.00014983528,0.026710046,0.000024670193,0.000034049608,0.00011236987,0.0016144553,0.95534945,0.0010169029,0.012661271,0.0022533024,0.000035934307],"about_ca_topic_score_codex":0.042228974,"about_ca_topic_score_gemma":0.09107495,"teacher_disagreement_score":0.042228974,"about_ca_system_score_codex":0.00202614,"about_ca_system_score_gemma":0.00090621336,"threshold_uncertainty_score":0.083966315},"labels":[],"label_agreement":null},{"id":"W4399461022","doi":"10.1016/j.automatica.2024.111758","title":"Online dynamic submodular optimization","year":2024,"lang":"en","type":"article","venue":"Automatica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Valorisation des Données","keywords":"Submodular set function; Mathematical optimization; Computer science; Mathematics","score_opus":0.004172722539743211,"score_gpt":0.20440403039712743,"score_spread":0.20023130785738422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399461022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068743816,0.00028924027,0.98707587,0.00038098698,0.00006342354,0.00008408883,0.0001179261,0.0008306697,0.004283413],"genre_scores_gemma":[0.4592415,0.00048452234,0.5314827,0.0007104885,0.00016159921,0.0005120747,0.00065493194,0.00039914338,0.0063530477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987691,0.00042331594,0.0000386895,0.00028150744,0.00028606545,0.0002012741],"domain_scores_gemma":[0.9980551,0.0011295523,0.00020369136,0.00032963103,0.00016461939,0.000117426796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013558458,0.0015918146,0.001647409,0.0005594168,0.000538396,0.001336875,0.0020812291,0.0015305242,0.00436771],"category_scores_gemma":[0.0044293725,0.0006376034,0.0007685668,0.0011461672,0.0010598147,0.0019585374,0.0020268278,0.0024726395,0.0010527074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001779409,0.00025888596,0.00047050856,0.0001641886,0.000054896365,0.00009248848,0.00005707111,0.8165149,0.001800896,0.05638361,0.011407339,0.11261725],"study_design_scores_gemma":[0.00001990338,0.000026086138,0.00003893078,0.0000055448345,0.0000030459632,0.000017059336,0.0000057197767,0.9835451,0.00028428022,0.015123907,0.00092642725,0.0000039791043],"about_ca_topic_score_codex":0.0021204585,"about_ca_topic_score_gemma":0.003159381,"teacher_disagreement_score":0.00436771,"about_ca_system_score_codex":0.0012327196,"about_ca_system_score_gemma":0.0018211838,"threshold_uncertainty_score":0.014611423},"labels":[],"label_agreement":null},{"id":"W4399526436","doi":"10.1109/access.2024.3412822","title":"A Distributed-Decentralized Tri-Layer Game-Based Transactive Energy Framework Including Adaptive Proximal ADMM and Scale- Independent DRO","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"Huawei Technologies","keywords":"Computer science; Transactive memory; Distributed computing; Layer (electronics); Scale (ratio); Physics; Knowledge management","score_opus":0.02987038551507187,"score_gpt":0.2764011843018137,"score_spread":0.24653079878674183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399526436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039522606,0.000116819734,0.9927544,0.000090279995,0.000031964315,0.000034655204,0.000020433607,0.0000688971,0.0029302523],"genre_scores_gemma":[0.7493134,0.00043635484,0.24169452,0.00021870689,0.000066785404,0.00030238536,0.000109359535,0.000058860503,0.0077994987],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930704,0.00020830323,0.000034062145,0.00017128806,0.00019815129,0.00008117685],"domain_scores_gemma":[0.9995759,0.0001726315,0.000057911555,0.000038268772,0.00011793807,0.00003725941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010440621,0.0011270016,0.0011238257,0.00041787507,0.000491174,0.0014001869,0.00179821,0.001234147,0.0023980923],"category_scores_gemma":[0.0010788369,0.0004664124,0.00097107264,0.00054725393,0.0009779149,0.0014816286,0.0017751111,0.0016307677,0.00036341354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046226553,0.000042192958,0.00027075064,0.00007777151,0.0000427381,0.00014630746,0.000056619916,0.9483682,0.003079401,0.028926669,0.0007219563,0.018221134],"study_design_scores_gemma":[0.000005777086,0.000020513527,0.000020640986,0.0000028078096,0.0000051409766,0.000016556103,0.0000070820884,0.99640167,0.00026269237,0.0027923766,0.00046053037,0.0000042096867],"about_ca_topic_score_codex":0.0030268102,"about_ca_topic_score_gemma":0.00304462,"teacher_disagreement_score":0.0030268102,"about_ca_system_score_codex":0.0007318472,"about_ca_system_score_gemma":0.001189003,"threshold_uncertainty_score":0.008022428},"labels":[],"label_agreement":null},{"id":"W4399765813","doi":"10.1016/j.apenergy.2024.123543","title":"Designing aggregation criteria for end-users integration in energy communities: Energy and economic optimisation based on hybrid neural networks models","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministero dell'Istruzione e del Merito; Ministero dell’Istruzione, dell’Università e della Ricerca","keywords":"Artificial neural network; Energy (signal processing); Computer science; Artificial intelligence; Mathematics","score_opus":0.01743678678789761,"score_gpt":0.2110195291292245,"score_spread":0.19358274234132689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399765813","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060116053,0.00022152675,0.9299479,0.00035087243,0.000031031104,0.0001382756,0.00006560094,0.000112758506,0.009015985],"genre_scores_gemma":[0.9100424,0.00019294204,0.08480419,0.00008943626,0.000029797035,0.00036543483,0.00008290708,0.00004638042,0.0043464927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990356,0.0004885657,0.000039151077,0.00013618053,0.00017371704,0.00012673125],"domain_scores_gemma":[0.9982475,0.0012545562,0.00018475768,0.00004590858,0.00021260369,0.0000546026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021406738,0.0011175206,0.0011465121,0.0011141415,0.00060063775,0.002038103,0.0015858066,0.0019564582,0.002242152],"category_scores_gemma":[0.0046399054,0.0007622485,0.0009168993,0.0008987619,0.00096525357,0.0018078673,0.0015865603,0.0011568988,0.00023797582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011045568,0.000012357702,0.00017961283,0.0000110574565,0.000009457817,0.000013100734,0.000012830175,0.9956564,0.00011776939,0.0018856081,0.000060835966,0.0020299677],"study_design_scores_gemma":[0.0000012330611,0.0000038732132,0.00003157168,0.0000023436776,0.0000015598746,0.0000016287527,0.000005365545,0.9991228,0.00003988987,0.0007431384,0.000045024364,0.0000015010697],"about_ca_topic_score_codex":0.010565198,"about_ca_topic_score_gemma":0.007234048,"teacher_disagreement_score":0.010565198,"about_ca_system_score_codex":0.002065065,"about_ca_system_score_gemma":0.0009730491,"threshold_uncertainty_score":0.021007419},"labels":[],"label_agreement":null},{"id":"W4399879138","doi":"10.1016/j.apenergy.2024.123736","title":"Lévy arithmetic optimization for energy Management of Solar Wind Microgrid with multiple diesel generators for off-grid communities","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Saint Mary's University","funders":"","keywords":"Microgrid; Diesel fuel; Wind power; Renewable energy; Grid; Energy management; Diesel generator; Arithmetic; Computer science; Environmental science; Mathematics; Automotive engineering; Mathematical optimization; Energy (signal processing); Electrical engineering; Engineering; Statistics","score_opus":0.007825332304657685,"score_gpt":0.18243136049392258,"score_spread":0.1746060281892649,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399879138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07049197,0.00031993724,0.9224288,0.00023118792,0.00006438914,0.000052011655,0.000022656623,0.00025976825,0.0061292863],"genre_scores_gemma":[0.90856797,0.00018471063,0.08764226,0.00007151378,0.000029538734,0.00008814997,0.00004408497,0.000043529,0.0033282354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998198,0.000054394717,0.000008365177,0.000026907623,0.00006555889,0.000025030102],"domain_scores_gemma":[0.9998691,0.000050233335,0.000020189693,0.000006980193,0.000042196152,0.000011362607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042000628,0.0005667431,0.00059489,0.0003680196,0.00035474583,0.0005736814,0.0005633072,0.0004552295,0.0011863913],"category_scores_gemma":[0.00057906756,0.00017412611,0.00047625776,0.00034253747,0.000311382,0.0005629229,0.00047540906,0.000508944,0.00015408265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003583108,0.000025765614,0.0002762986,0.000024302974,0.00001816274,0.000032690004,0.000022943352,0.9642027,0.0022320515,0.00463417,0.00042060693,0.02807455],"study_design_scores_gemma":[0.0000049834152,0.000018752839,0.00003921947,0.0000010476633,0.0000027918513,0.000004036424,0.0000035123483,0.99884427,0.00025860278,0.0006439112,0.00017706597,0.0000017904691],"about_ca_topic_score_codex":0.0032175898,"about_ca_topic_score_gemma":0.0030532312,"teacher_disagreement_score":0.0032175898,"about_ca_system_score_codex":0.00058902067,"about_ca_system_score_gemma":0.0007508554,"threshold_uncertainty_score":0.006397724},"labels":[],"label_agreement":null},{"id":"W4399923960","doi":"10.1109/icnc59896.2024.10556254","title":"Synthetic Power Consumption Data Generation For Appliance Operation Modes","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Power consumption; Computer science; Consumption (sociology); Power (physics); Embedded system","score_opus":0.07986225791301788,"score_gpt":0.28220415472358484,"score_spread":0.20234189681056697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399923960","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8851184,0.00011145502,0.097672544,0.00031699313,0.0001437485,0.00020418178,0.009971707,0.0020386756,0.0044223573],"genre_scores_gemma":[0.98046196,0.00004762411,0.011427417,0.00003791881,0.000011613612,0.000102570586,0.0073198336,0.000047965237,0.0005431518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996525,0.00010597371,0.000022701457,0.000082762715,0.000093668576,0.000042438933],"domain_scores_gemma":[0.9986927,0.0005789966,0.00009491958,0.00030539389,0.00028193995,0.00004613309],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063536986,0.00052689755,0.00030892537,0.00062808563,0.00019316029,0.00039083444,0.0006487191,0.0005339669,0.0011243728],"category_scores_gemma":[0.002950166,0.00014938645,0.00047234897,0.0010185597,0.00030285039,0.00057558494,0.0003784387,0.00060919585,0.0003347426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051990704,0.00044267604,0.028923253,0.00019812438,0.00010246759,0.00035561013,0.00019209835,0.89237654,0.007874146,0.0059743286,0.009541189,0.053499583],"study_design_scores_gemma":[0.000018078597,0.00006693552,0.0073075327,0.0000076975075,0.000008576837,0.00007471963,0.000083188446,0.9841599,0.004711985,0.001736038,0.0018097748,0.000015574251],"about_ca_topic_score_codex":0.0036159237,"about_ca_topic_score_gemma":0.0035359182,"teacher_disagreement_score":0.0036159237,"about_ca_system_score_codex":0.00040687277,"about_ca_system_score_gemma":0.00037659946,"threshold_uncertainty_score":0.0071897507},"labels":[],"label_agreement":null},{"id":"W4399976810","doi":"10.3126/injet.v1i2.66684","title":"Different Demand Response Programs with its Implementation in Various Countries and the Role of TOU DR in the Context of Nepal","year":2024,"lang":"en","type":"article","venue":"International Journal on Engineering Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Context (archaeology); Business; Computer science; Geography; Archaeology","score_opus":0.0031484718924240647,"score_gpt":0.21882265148847652,"score_spread":0.21567417959605245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399976810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9334611,0.001975644,0.0034108993,0.003982645,0.00006878205,0.00018361988,0.00045540137,0.0000816842,0.056380194],"genre_scores_gemma":[0.9939867,0.0009069709,0.0011570182,0.00032589698,0.000010818828,0.000046721132,0.00012039769,0.000012881425,0.00343247],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99883443,0.00058225327,0.00006792451,0.00012042485,0.00015165385,0.00024335051],"domain_scores_gemma":[0.9983773,0.0005561545,0.00026437425,0.000103774306,0.00048596846,0.0002124003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012191253,0.00015478993,0.00011167747,0.00053919584,0.0006305589,0.001526109,0.000625883,0.00042443647,0.0019976478],"category_scores_gemma":[0.002977186,0.0001287854,0.00018363235,0.0011812127,0.00051473477,0.0009753513,0.0009002974,0.0006860086,0.00020336045],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010047535,0.0012226369,0.3065472,0.0027572997,0.00021182423,0.0065387855,0.026150623,0.01568301,0.009935599,0.058781557,0.010885688,0.56028104],"study_design_scores_gemma":[0.000112415866,0.0017151651,0.7345788,0.0010610581,0.00026447367,0.0051202397,0.060850237,0.010991749,0.010178011,0.004699474,0.17026165,0.00016667916],"about_ca_topic_score_codex":0.012519634,"about_ca_topic_score_gemma":0.016115647,"teacher_disagreement_score":0.012519634,"about_ca_system_score_codex":0.001579688,"about_ca_system_score_gemma":0.0015800258,"threshold_uncertainty_score":0.024893522},"labels":[],"label_agreement":null},{"id":"W4400077752","doi":"10.1016/j.segan.2024.101460","title":"Hierarchical transactive home energy management system groups coordination through multi-level consensus sharing-based distributed ADMM","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Hierarchy; Aggregate (composite); Grid; Constraint (computer-aided design); Computer science; Electricity; Smart grid; Distributed computing; Demand response; Distributed generation; Environmental economics; Operations research; Knowledge management; Engineering; Economics; Renewable energy; Mathematics","score_opus":0.009116366504631592,"score_gpt":0.20235443642700174,"score_spread":0.19323806992237014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400077752","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009638659,0.0000626741,0.9877416,0.00007956702,0.000020526437,0.000031253294,0.000013546175,0.00017395633,0.0022382226],"genre_scores_gemma":[0.83196706,0.00010053215,0.16445555,0.00012627053,0.000030164187,0.00015997264,0.00008094041,0.00003621032,0.0030433245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908566,0.0002741349,0.000052393658,0.0002381439,0.00023899369,0.000110593115],"domain_scores_gemma":[0.9993462,0.00021290427,0.00011846246,0.00008181058,0.00018600929,0.00005474424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013685725,0.0008028743,0.0009243279,0.0004839893,0.00076177355,0.0012074325,0.0016497029,0.0007750593,0.0014692561],"category_scores_gemma":[0.0014418879,0.00039968395,0.0007043241,0.00060615514,0.0007759465,0.0010433675,0.0018818438,0.00101451,0.00025204394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006220533,0.0000416591,0.0003632402,0.00004260986,0.000046724817,0.000072474555,0.00010862001,0.95629674,0.0036488802,0.008304987,0.0006114566,0.03040052],"study_design_scores_gemma":[0.0000067292945,0.000019547862,0.000035773333,0.000001807481,0.000005528682,0.0000066426232,0.000011992158,0.9975152,0.0003817959,0.0017360715,0.00027564346,0.000003167343],"about_ca_topic_score_codex":0.004716542,"about_ca_topic_score_gemma":0.005097194,"teacher_disagreement_score":0.004716542,"about_ca_system_score_codex":0.00075903337,"about_ca_system_score_gemma":0.0013836912,"threshold_uncertainty_score":0.009378195},"labels":[],"label_agreement":null},{"id":"W4400178262","doi":"10.1016/j.epsr.2024.110749","title":"Causality-based cost allocation for peer-to-peer energy trading in distribution system","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Peer-to-peer; Causality (physics); Computer science; Distribution (mathematics); Energy (signal processing); Econometrics; Economics; Distributed computing; Mathematics; Statistics; Physics","score_opus":0.0365871053958208,"score_gpt":0.3174858145771881,"score_spread":0.2808987091813673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400178262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043976173,0.0003031295,0.9508668,0.00037992757,0.00015242555,0.00016628098,0.00008691127,0.00040434636,0.0036639497],"genre_scores_gemma":[0.9413369,0.00012425658,0.05654871,0.000060073315,0.00006342478,0.000084600935,0.00007980249,0.000062021754,0.0016403159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998825,0.0005199732,0.00007603559,0.00015560686,0.00027307458,0.00015023608],"domain_scores_gemma":[0.99658114,0.0023442558,0.00015981276,0.00020384707,0.00054702343,0.00016389338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025959886,0.0008225329,0.0018570812,0.00079367124,0.0010095687,0.0016313329,0.0020368758,0.0012810505,0.0057988525],"category_scores_gemma":[0.009214802,0.0004999309,0.00056042627,0.0009612202,0.00085595326,0.0023335146,0.0016533888,0.0010711225,0.0003784342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003335743,0.00016135199,0.000668169,0.0001286571,0.000047301335,0.00009323939,0.00006733713,0.90045285,0.0013774403,0.027890416,0.0020556378,0.066723935],"study_design_scores_gemma":[0.000013330088,0.00001799216,0.00007310631,0.0000019302154,0.000005475897,0.0000147109995,0.000009096652,0.99007416,0.0001930256,0.009473372,0.000119164615,0.0000046356304],"about_ca_topic_score_codex":0.003319565,"about_ca_topic_score_gemma":0.00434561,"teacher_disagreement_score":0.0057988525,"about_ca_system_score_codex":0.0010078739,"about_ca_system_score_gemma":0.0018671135,"threshold_uncertainty_score":0.019399047},"labels":[],"label_agreement":null},{"id":"W4400318774","doi":"10.1016/j.epsr.2024.110635","title":"A quasi-static time-series approach to assess the impact of high distributed energy resources penetration on transmission system expansion planning","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Series (stratigraphy); Distributed generation; Penetration (warfare); Computer science; High energy; Electric power transmission; Engineering; Geology; Electrical engineering; Operations research; Renewable energy; Engineering physics","score_opus":0.03302978654345405,"score_gpt":0.2999679534753622,"score_spread":0.26693816693190814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400318774","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35164836,0.00034665273,0.63505876,0.0004209401,0.00019555532,0.00013206934,0.0008714009,0.0004046173,0.010921734],"genre_scores_gemma":[0.9730305,0.00014605564,0.023445603,0.00005566007,0.00005100305,0.000081523795,0.00026895042,0.000036465677,0.0028842022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995577,0.00024200286,0.000016458454,0.000066495406,0.00007736691,0.00004003089],"domain_scores_gemma":[0.9974559,0.0020345377,0.00015642574,0.0000956091,0.00019394782,0.000063514344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022336524,0.00047133,0.0004693956,0.0008223919,0.00030097226,0.0006424219,0.00075658853,0.000893859,0.003935166],"category_scores_gemma":[0.0046285535,0.00026781607,0.0006693728,0.0007644712,0.00037539564,0.0007720989,0.00033769087,0.00066364044,0.0002381118],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009098466,0.00010194337,0.003233181,0.000054136653,0.00012255777,0.00013568172,0.000031069394,0.9622231,0.0013944876,0.021063635,0.0007508211,0.010798417],"study_design_scores_gemma":[0.0000032027233,0.000053241907,0.00088374596,0.0000018367346,0.000009210241,0.00001109344,0.000011247114,0.9976665,0.00008211628,0.0011469886,0.0001271757,0.0000038004382],"about_ca_topic_score_codex":0.006212628,"about_ca_topic_score_gemma":0.005036393,"teacher_disagreement_score":0.006212628,"about_ca_system_score_codex":0.0005856242,"about_ca_system_score_gemma":0.0004951462,"threshold_uncertainty_score":0.013164401},"labels":[],"label_agreement":null},{"id":"W4400410871","doi":"10.1109/mits.2024.3401536","title":"An Introduction to the Smart Urban Mobility Laboratory at University of South Florida [ITS Research Lab]","year":2024,"lang":"en","type":"article","venue":"IEEE Intelligent Transportation Systems Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Aeronautics; Computer science","score_opus":0.02533476871600223,"score_gpt":0.25125975821735547,"score_spread":0.22592498950135323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400410871","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030588272,0.023942895,0.080420144,0.0695142,0.029968532,0.0010192983,0.0036529256,0.014839165,0.7735841],"genre_scores_gemma":[0.016627597,0.024571475,0.04980471,0.014271119,0.011395504,0.0006185013,0.0046397797,0.002396385,0.87567484],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985672,0.0002345211,0.000056998248,0.0002524307,0.0006846874,0.00020406971],"domain_scores_gemma":[0.9981876,0.00019609577,0.000073754614,0.00015942137,0.00069928134,0.00068377145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024690572,0.0015358398,0.0005035047,0.001963207,0.0020312683,0.0048526297,0.0013688391,0.002230316,0.13567525],"category_scores_gemma":[0.0021840876,0.0006499636,0.00055420835,0.0018040995,0.00084016455,0.0054619135,0.0027347603,0.0028034532,0.07850327],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034882414,0.000079002166,0.00030489507,0.0000762237,0.0000029753437,0.00009837812,0.0001517518,0.00015885352,0.0018624483,0.009325609,0.8825206,0.10538444],"study_design_scores_gemma":[0.000005015643,0.000026597023,0.00015475923,0.00005222439,0.0000014490347,0.00008105513,0.000054529275,0.00013990427,0.00018516461,0.00086379686,0.9984274,0.000008159201],"about_ca_topic_score_codex":0.006779537,"about_ca_topic_score_gemma":0.015161947,"teacher_disagreement_score":0.13567525,"about_ca_system_score_codex":0.0016954732,"about_ca_system_score_gemma":0.0040953,"threshold_uncertainty_score":0.45387894},"labels":[],"label_agreement":null},{"id":"W4400446536","doi":"10.3390/en17143371","title":"Review on Advanced Storage Control Applied to Optimized Operation of Energy Systems for Buildings and Districts: Insights and Perspectives","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministero dell'Università e della Ricerca; European Commission","keywords":"Flexibility (engineering); Computer science; Context (archaeology); Renewable energy; Energy storage; Control (management); Systems engineering; Resilience (materials science); Risk analysis (engineering); Component (thermodynamics); Reliability engineering; Industrial engineering; Engineering; Management science; Artificial intelligence","score_opus":0.006651571402258944,"score_gpt":0.20705471162775907,"score_spread":0.20040314022550013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400446536","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002700443,0.9972602,0.0008065624,0.00027008523,0.00022947667,0.000012596567,0.000036883634,0.000007870463,0.0011063064],"genre_scores_gemma":[0.0030392352,0.99566454,0.00059159135,0.00018177924,0.0002032814,0.000012676282,0.000037949598,0.0000035533021,0.0002654386],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936455,0.00016741983,0.00014818153,0.00010265311,0.0001797083,0.000037545422],"domain_scores_gemma":[0.9969216,0.0023482658,0.00025257532,0.000065540014,0.00038022723,0.000031854193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012678016,0.0009717223,0.0017267311,0.0023592205,0.0002604798,0.0016649632,0.0009210517,0.0011025318,0.003575488],"category_scores_gemma":[0.003970876,0.00040062313,0.0012486118,0.0037027274,0.00038491172,0.0015388905,0.0005284044,0.0008987842,0.00073699123],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013516624,0.00006764937,0.0003756229,0.1808393,0.0007408925,0.00023594168,0.00022371404,0.0037030638,0.0018553968,0.016562777,0.019293185,0.7759673],"study_design_scores_gemma":[0.00003199309,0.0003969262,0.0018779415,0.068099104,0.0016674029,0.00091075146,0.00026468537,0.0013036317,0.0015241283,0.007501629,0.91635233,0.00006954294],"about_ca_topic_score_codex":0.001779239,"about_ca_topic_score_gemma":0.002354833,"teacher_disagreement_score":0.003575488,"about_ca_system_score_codex":0.00066113676,"about_ca_system_score_gemma":0.0025162653,"threshold_uncertainty_score":0.011961162},"labels":[],"label_agreement":null},{"id":"W4400599908","doi":"10.1016/j.apenergy.2024.123868","title":"A multi-stage techno-economic model for harnessing flexibility from IoT-enabled appliances and smart charging systems: Developing a competitive local flexibility market using Stackelberg game theory","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Stackelberg competition; Flexibility (engineering); Internet of Things; Game theory; Computer science; Environmental economics; Business; Industrial organization; Economics; Computer security; Microeconomics","score_opus":0.039231063550152226,"score_gpt":0.26262643610970066,"score_spread":0.22339537255954844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400599908","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0759803,0.00043878902,0.8571417,0.0015689622,0.00013657585,0.00021754524,0.00039814223,0.00017767212,0.06394029],"genre_scores_gemma":[0.95227146,0.00036496596,0.02389735,0.00013286667,0.00004322419,0.00029033064,0.00010087037,0.000037204303,0.022861607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994382,0.00020768904,0.000017228265,0.000103750324,0.00009658161,0.0001364726],"domain_scores_gemma":[0.9994593,0.00029101974,0.0000700886,0.000026615095,0.00007662695,0.0000764342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010999715,0.0009951233,0.0013071103,0.0006050143,0.00083161297,0.0027227676,0.0025565373,0.0028259633,0.008334163],"category_scores_gemma":[0.0016130068,0.0007549245,0.0013878247,0.00088872196,0.0016830788,0.0028057978,0.001722796,0.0017924896,0.00073620223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052440926,0.000059158614,0.00023007099,0.00005721952,0.000032614953,0.00017770915,0.000066827844,0.84179723,0.0011305586,0.15311246,0.00070824486,0.0025754704],"study_design_scores_gemma":[0.000017837581,0.000028522947,0.000054982724,0.0000053881045,0.000011539588,0.000016917704,0.000020685644,0.98098123,0.00010663478,0.018299785,0.00044424616,0.000012319881],"about_ca_topic_score_codex":0.008549806,"about_ca_topic_score_gemma":0.007045771,"teacher_disagreement_score":0.008549806,"about_ca_system_score_codex":0.0020910406,"about_ca_system_score_gemma":0.0021142724,"threshold_uncertainty_score":0.02788055},"labels":[],"label_agreement":null},{"id":"W4400618058","doi":"10.1016/j.scs.2024.105664","title":"An integrated price- and incentive-based demand response program for smart residential buildings: A robust multi-objective model","year":2024,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alterra Power (Canada)","funders":"Iran National Science Foundation","keywords":"Demand response; Incentive; Architectural engineering; Computer science; Business; Engineering; Economics; Microeconomics; Electrical engineering","score_opus":0.008922973927154038,"score_gpt":0.23885967916062906,"score_spread":0.229936705233475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400618058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109151915,0.0005251405,0.8689629,0.0010885455,0.000145447,0.00029431356,0.00065175,0.0007103937,0.018469593],"genre_scores_gemma":[0.96103,0.00016094405,0.030393658,0.00012813578,0.000043960477,0.00023262126,0.00022779193,0.00007364312,0.0077091446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989768,0.00035417234,0.000033601234,0.00023422227,0.00015763346,0.00024359419],"domain_scores_gemma":[0.9987404,0.00068301446,0.0001573353,0.000046813046,0.00025876358,0.000113818045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021612737,0.0013433435,0.0030817227,0.00071159983,0.0005825379,0.0020476144,0.0028321121,0.0032809381,0.0061381883],"category_scores_gemma":[0.0027720793,0.0012665861,0.0011979789,0.0010140829,0.0010069563,0.0017856413,0.0018341428,0.001998713,0.000591976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033405235,0.000025918896,0.000054505534,0.000014428088,0.000011726452,0.000017392844,0.000005628936,0.9973001,0.00009937642,0.0008937987,0.00018220133,0.0013615882],"study_design_scores_gemma":[0.000009755826,0.000013256463,0.000024992163,0.0000012259657,0.000004490413,0.0000015723947,0.000002681476,0.9996057,0.000026083879,0.00026269924,0.000045421424,0.0000021618407],"about_ca_topic_score_codex":0.021420537,"about_ca_topic_score_gemma":0.014864054,"teacher_disagreement_score":0.021420537,"about_ca_system_score_codex":0.0020710712,"about_ca_system_score_gemma":0.0024798303,"threshold_uncertainty_score":0.04259169},"labels":[],"label_agreement":null},{"id":"W4400739389","doi":"10.1002/net.22242","title":"Three network design problems for community energy storage","year":2024,"lang":"en","type":"article","venue":"Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science","score_opus":0.027192181879567113,"score_gpt":0.20845300647603787,"score_spread":0.18126082459647075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400739389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.068043016,0.00085806,0.8980554,0.0021937927,0.00015004996,0.00029991867,0.00059916073,0.00018435526,0.02961628],"genre_scores_gemma":[0.86460143,0.00059563515,0.11368927,0.00025601973,0.00007022752,0.0005224651,0.00036802137,0.00013238477,0.019764515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909437,0.00047069945,0.00002462715,0.00017329505,0.000109628505,0.00012736658],"domain_scores_gemma":[0.9984681,0.0010196462,0.00014463616,0.000056402085,0.00019260422,0.00011859123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018565685,0.0012594049,0.0009825545,0.0010337131,0.0010059634,0.0022918535,0.0015702688,0.0022036615,0.010416765],"category_scores_gemma":[0.0040540067,0.00078466855,0.0011514461,0.0011994666,0.0010159493,0.0025067853,0.0018177164,0.0017322963,0.00043311983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005864737,0.000051944517,0.0002756395,0.00006998377,0.00003524049,0.00009826261,0.000048780283,0.9213488,0.00033899615,0.068502665,0.0024079233,0.006763178],"study_design_scores_gemma":[0.000020037176,0.00002000672,0.00006484743,0.000012709224,0.0000073249234,0.000023561293,0.00003677603,0.9769976,0.00016258068,0.021274649,0.0013728981,0.0000069317325],"about_ca_topic_score_codex":0.007430099,"about_ca_topic_score_gemma":0.00666173,"teacher_disagreement_score":0.010416765,"about_ca_system_score_codex":0.0038478605,"about_ca_system_score_gemma":0.0017611646,"threshold_uncertainty_score":0.034847558},"labels":[],"label_agreement":null},{"id":"W4401041987","doi":"10.1016/j.ijhydene.2024.07.273","title":"A novel risk-averse optimal scheduling strategy for active distribution networks equipped with power-to-X technologies","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Public Authority for Applied Education and Training","keywords":"Computer science; Scheduling (production processes); Mathematical optimization; Power (physics); Operations research; Mathematics","score_opus":0.00959017941805569,"score_gpt":0.2364946537582608,"score_spread":0.2269044743402051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401041987","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037266813,0.00043636907,0.95480233,0.00025226845,0.00014527857,0.00009585684,0.000047395046,0.00020590238,0.006747839],"genre_scores_gemma":[0.94262654,0.00022588765,0.05355972,0.00012325145,0.00008588688,0.00005830893,0.00003878952,0.00002723399,0.0032544686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996867,0.000072606286,0.0000119799515,0.00006147605,0.00008917892,0.0000780867],"domain_scores_gemma":[0.99964666,0.00014412326,0.00006653844,0.000019812273,0.00007278057,0.000050087754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005437479,0.0009166324,0.0010240445,0.00033664424,0.0004130469,0.0009484143,0.0010022646,0.0006820445,0.0025229321],"category_scores_gemma":[0.000998557,0.00034499675,0.00038985407,0.00036396654,0.00035539287,0.000717244,0.00075310736,0.00066345354,0.00026288017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016747246,0.00010742409,0.00031081165,0.000073808056,0.000045266344,0.000121294855,0.000055277833,0.9365829,0.004823424,0.012865113,0.001967042,0.042880155],"study_design_scores_gemma":[0.000013978513,0.00005645011,0.00006379754,0.0000032518642,0.0000067914366,0.000020675756,0.000007298457,0.99713826,0.00022833534,0.0022014866,0.00025618385,0.000003553783],"about_ca_topic_score_codex":0.0035523993,"about_ca_topic_score_gemma":0.004141181,"teacher_disagreement_score":0.0035523993,"about_ca_system_score_codex":0.00068635,"about_ca_system_score_gemma":0.0013136975,"threshold_uncertainty_score":0.008440077},"labels":[],"label_agreement":null},{"id":"W4401069949","doi":"10.1016/j.apenergy.2024.123988","title":"Residential consumer enrollment in demand response: An agent based approach","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Strategic Research Council","keywords":"Flexibility (engineering); Quarter (Canadian coin); Demand response; Environmental economics; Business; Energy (signal processing); Consumer demand; Economics; Marketing; Microeconomics; Engineering; Electricity; Geography; Statistics","score_opus":0.00970110540018108,"score_gpt":0.2078052116385689,"score_spread":0.19810410623838784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401069949","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3603054,0.0004669565,0.6170388,0.0017883611,0.00011023795,0.00037246314,0.0007129185,0.0002818318,0.018922998],"genre_scores_gemma":[0.95979553,0.0001896618,0.030893536,0.00011801339,0.00005196763,0.00022898534,0.00017497393,0.000026528196,0.008520789],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992021,0.00044517565,0.000023079005,0.00013283205,0.00008721521,0.00010958336],"domain_scores_gemma":[0.99804354,0.0014343528,0.00023092392,0.00004305897,0.00015306404,0.00009492765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001246575,0.00072482193,0.0011804057,0.0006250163,0.00053517293,0.0017444339,0.001552198,0.0014859268,0.004779224],"category_scores_gemma":[0.0026879036,0.0005306519,0.00079358544,0.0006762007,0.0005358679,0.0010648592,0.0009575128,0.0012355497,0.0003246955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005891286,0.000089328285,0.002153054,0.000025706238,0.000049699054,0.00010780496,0.00004495248,0.98589295,0.00021150186,0.007726113,0.00030005397,0.0033399828],"study_design_scores_gemma":[0.000004476052,0.000011564766,0.000099713485,0.0000012044821,0.0000050384438,0.000004641043,0.000013988164,0.9987978,0.000021443047,0.0009217677,0.00011578909,0.0000026151417],"about_ca_topic_score_codex":0.012739417,"about_ca_topic_score_gemma":0.011229117,"teacher_disagreement_score":0.012739417,"about_ca_system_score_codex":0.0014884135,"about_ca_system_score_gemma":0.0012424062,"threshold_uncertainty_score":0.025330544},"labels":[],"label_agreement":null},{"id":"W4401107662","doi":"10.47604/ijts.2815","title":"The Effect of Smart Grid Technology on Energy Consumption Management in Canada","year":2024,"lang":"en","type":"article","venue":"International Journal of Technology and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Smart grid; Energy consumption; Computer science; Energy management; Environmental economics; Renewable energy; Demand response; Big data; Consumption (sociology); Efficient energy use; Engineering; Energy (signal processing); Electricity; Electrical engineering; Data mining","score_opus":0.0036708286313792476,"score_gpt":0.2022788544140931,"score_spread":0.19860802578271386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401107662","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95459676,0.0022851902,0.00060219836,0.0070576654,0.000069928945,0.00013177592,0.0025779973,0.00007219471,0.032606192],"genre_scores_gemma":[0.9933329,0.0009732484,0.00045120492,0.00029569303,0.0000064108845,0.00001876601,0.0003765961,0.000011108063,0.0045340634],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9977036,0.0002154318,0.00008593657,0.00017986084,0.0010431653,0.00077199587],"domain_scores_gemma":[0.99287957,0.0008398687,0.000686935,0.0001451738,0.0039340174,0.001514434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010833282,0.00024720837,0.00034739153,0.0011346255,0.0036708277,0.0028131132,0.0010442422,0.00043276555,0.0036919722],"category_scores_gemma":[0.0063670934,0.0001839834,0.00058730925,0.003944882,0.0013223453,0.0007206553,0.0013081752,0.0008302053,0.00019795209],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006433831,0.00039756685,0.84371096,0.00049537106,0.0001889764,0.00059333746,0.005783552,0.0053954194,0.0012415947,0.014788463,0.013277721,0.113483675],"study_design_scores_gemma":[0.000037487167,0.00010668524,0.9589965,0.00020383373,0.000107492255,0.000080536774,0.0117081795,0.0041709794,0.0010259468,0.0006880288,0.022818187,0.000056116536],"about_ca_topic_score_codex":0.9981013,"about_ca_topic_score_gemma":0.9984946,"teacher_disagreement_score":0.12808768,"about_ca_system_score_codex":0.12808768,"about_ca_system_score_gemma":0.19797774,"threshold_uncertainty_score":0.92934555},"labels":[],"label_agreement":null},{"id":"W4401114264","doi":"10.1109/cpe-powereng60842.2024.10604314","title":"Practical Cost Effectiveness Analysis for Solar Energy Systems: Case Study of Stand-Alone Retail Building","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Solar energy; Computer science; Photovoltaic system; Energy (signal processing); Architectural engineering; Environmental economics; Engineering; Electrical engineering; Economics; Mathematics; Statistics","score_opus":0.03791015750043722,"score_gpt":0.3047690627353386,"score_spread":0.2668589052349014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401114264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97820187,0.00042040765,0.007888408,0.0002511625,0.000016080568,0.00022244231,0.00044791144,0.00006627522,0.01248546],"genre_scores_gemma":[0.99652773,0.00011592777,0.002206333,0.0000083722225,0.0000041995845,0.000029286875,0.00006359567,0.0000075465964,0.0010370907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990876,0.00047764904,0.000032494754,0.00006517574,0.00018166758,0.00015540674],"domain_scores_gemma":[0.9925546,0.006466956,0.00022528073,0.00018309291,0.00040291258,0.00016720014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018352842,0.0011347034,0.0008323475,0.0016910253,0.00072065194,0.0014386016,0.0011766292,0.0016158682,0.0058360947],"category_scores_gemma":[0.00425571,0.00046682628,0.0010262962,0.0014094092,0.00077594793,0.0012614579,0.00079774566,0.0008928537,0.00022904675],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004827221,0.00048994477,0.005042955,0.00026325788,0.00006593126,0.0007136211,0.00007104523,0.97866255,0.0027710963,0.0027047116,0.00045008722,0.0082820235],"study_design_scores_gemma":[0.000084879284,0.0013284378,0.006529325,0.0000215304,0.00009477262,0.0002417453,0.00050541566,0.9861687,0.0029384608,0.0014951476,0.0005542214,0.000037529564],"about_ca_topic_score_codex":0.013278784,"about_ca_topic_score_gemma":0.0148010785,"teacher_disagreement_score":0.013278784,"about_ca_system_score_codex":0.0025763786,"about_ca_system_score_gemma":0.00091809116,"threshold_uncertainty_score":0.02640301},"labels":[],"label_agreement":null},{"id":"W4401402766","doi":"10.1049/enc2.12123","title":"A novel iterative double auction design and simulation platform for packetized energy trading of prosumers in a residential microgrid","year":2024,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Microgrid; Bidding; Demand response; Computer science; Scalability; Double auction; Context (archaeology); Environmental economics; Distributed computing; Business; Electricity; Common value auction; Control (management); Engineering; Microeconomics; Economics","score_opus":0.019696202323846262,"score_gpt":0.2130411520925637,"score_spread":0.19334494976871744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401402766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.119646095,0.00007083761,0.87090975,0.00011384863,0.000038714217,0.00022871481,0.00006248256,0.0009690654,0.007960455],"genre_scores_gemma":[0.921545,0.000056593526,0.076240905,0.000026267533,0.000005538499,0.00022030104,0.000052496925,0.000044291835,0.001808555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966764,0.00013344728,0.000017406737,0.00004472111,0.00008593543,0.00005088676],"domain_scores_gemma":[0.9995735,0.00017962848,0.000047265337,0.00005472897,0.000096558666,0.000048339894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083930435,0.0005473139,0.0005427035,0.0003071065,0.00043710374,0.0008358139,0.0012582593,0.0005690937,0.002737469],"category_scores_gemma":[0.0010172277,0.00033081818,0.0005065649,0.00020747124,0.00048297513,0.00058784714,0.00090253603,0.0006359948,0.00025161993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008221432,0.000056510195,0.00064809865,0.00002914038,0.000017951907,0.00010523628,0.00004805179,0.98540986,0.0032348603,0.0045560817,0.00018351995,0.005628436],"study_design_scores_gemma":[0.0000063864613,0.000015500473,0.000026862763,7.372329e-7,0.0000023757962,0.000004596036,0.0000039561896,0.99906904,0.0003981798,0.000318575,0.00015218763,0.0000016428042],"about_ca_topic_score_codex":0.003448273,"about_ca_topic_score_gemma":0.0026463794,"teacher_disagreement_score":0.003448273,"about_ca_system_score_codex":0.00049267686,"about_ca_system_score_gemma":0.0009891287,"threshold_uncertainty_score":0.009157717},"labels":[],"label_agreement":null},{"id":"W4401416789","doi":"10.1109/jiot.2024.3440320","title":"A Clockless Derivative-Dependent Sampling Scheme for Energy-Efficient IoT Applications","year":2024,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Computer science; Scheme (mathematics); Derivative (finance); Sampling (signal processing); Algorithm; Mathematical optimization; Telecommunications; Mathematics","score_opus":0.019277141885294787,"score_gpt":0.25637748485779444,"score_spread":0.23710034297249966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401416789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15354198,0.0008228595,0.8372838,0.00023915447,0.00014495855,0.00009375665,0.000106965475,0.0007573261,0.0070092296],"genre_scores_gemma":[0.8474564,0.00027755107,0.14895502,0.00012292397,0.00004542851,0.00003240795,0.00008121355,0.00003618031,0.0029928512],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99987686,0.000019222309,0.000010483669,0.00002899552,0.00005326515,0.00001114443],"domain_scores_gemma":[0.9998524,0.00003390089,0.00002680679,0.00003539823,0.00004078541,0.000010664458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020475236,0.00021834529,0.00017154912,0.00023781821,0.00019377052,0.00029162545,0.0005577647,0.00019659086,0.001247284],"category_scores_gemma":[0.0005272615,0.00009285815,0.00011832379,0.0003325098,0.00022480612,0.0005776888,0.00026149055,0.00024635025,0.00022835944],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046514036,0.00006975868,0.0014134219,0.0001509208,0.000014099995,0.00015715159,0.00017112202,0.012056106,0.7258988,0.017703352,0.0014417528,0.2404584],"study_design_scores_gemma":[0.00007087248,0.00049977825,0.001999195,0.000032478623,0.000042786127,0.000644325,0.000050793406,0.46287578,0.5071157,0.003749835,0.022876373,0.000042013344],"about_ca_topic_score_codex":0.0004365039,"about_ca_topic_score_gemma":0.0008724208,"teacher_disagreement_score":0.001247284,"about_ca_system_score_codex":0.00034878476,"about_ca_system_score_gemma":0.00022989874,"threshold_uncertainty_score":0.0041725636},"labels":[],"label_agreement":null},{"id":"W4401476820","doi":"10.1016/j.apenergy.2024.124081","title":"Bottom-up framework for modelling occupancy-based demand-side management strategies in a mixed-use district","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Fonds de Recherche du Québec - Santé; Social Sciences and Humanities Research Council of Canada; Fonds de recherche du Québec – Nature et technologies; Laurea University of Applied Sciences","keywords":"Occupancy; Demand side; Environmental economics; Business; Computer science; Environmental science; Engineering; Economics; Civil engineering","score_opus":0.015186479107637915,"score_gpt":0.22328896611973445,"score_spread":0.20810248701209655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401476820","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056181304,0.00017151183,0.92797744,0.00014454994,0.000033814933,0.00015555671,0.001250919,0.0007159308,0.01336901],"genre_scores_gemma":[0.82715684,0.0003021951,0.16337612,0.00005912059,0.000024017147,0.00041790714,0.0011843903,0.0001356945,0.0073435795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976975,0.000064479835,0.000012860251,0.000044661407,0.000053851803,0.000054429926],"domain_scores_gemma":[0.99978834,0.000089127185,0.00002351042,0.000017443941,0.00006137995,0.000020253317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039346097,0.00067625166,0.0005993796,0.0005850075,0.00048003293,0.0014344798,0.001761047,0.00094414124,0.0034745568],"category_scores_gemma":[0.0008561164,0.0005599233,0.0010175505,0.000793689,0.0004971322,0.0006048976,0.0009775986,0.00071380864,0.00051886326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000653788,0.000009447069,0.0005016626,0.000013380349,0.0000074850936,0.000025837431,0.000025322808,0.99399674,0.00031976416,0.003016522,0.00010773916,0.0019695188],"study_design_scores_gemma":[0.0000021114183,0.000004189249,0.00017109668,0.0000027315236,0.0000027957508,0.000003815119,0.000017451428,0.99840385,0.00008935986,0.00080747815,0.00049193087,0.0000032461878],"about_ca_topic_score_codex":0.11625261,"about_ca_topic_score_gemma":0.11689013,"teacher_disagreement_score":0.11625261,"about_ca_system_score_codex":0.0017016749,"about_ca_system_score_gemma":0.0017253344,"threshold_uncertainty_score":0.23115188},"labels":[],"label_agreement":null},{"id":"W4401567648","doi":"10.1109/access.2024.3443471","title":"Optimal Multi-Microgrids Energy Management Through Information Gap Decision Theory and Tunicate Swarm Algorithm","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Tunicate; Computer science; Swarm behaviour; Decision theory; Energy (signal processing); Algorithm; Mathematical optimization; Artificial intelligence; Mathematics","score_opus":0.016773893216493092,"score_gpt":0.27112638396181504,"score_spread":0.25435249074532196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401567648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033690352,0.00040311055,0.9580389,0.00024958933,0.000054559816,0.00007022088,0.00005632669,0.00019903513,0.007237883],"genre_scores_gemma":[0.932177,0.00027223537,0.064477965,0.00009208493,0.00003325415,0.00019437609,0.000096902586,0.000033161483,0.002622949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997223,0.00009555203,0.000016317743,0.000053834658,0.000067211295,0.00004473226],"domain_scores_gemma":[0.99950266,0.0003048216,0.00006387257,0.000017862216,0.00008383457,0.000026955713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008130388,0.0009414285,0.0010193984,0.00052817876,0.0004595448,0.001241348,0.0008628692,0.0008706279,0.0016187062],"category_scores_gemma":[0.0013915561,0.00045301186,0.0007329146,0.00049431104,0.00058193825,0.0006969951,0.0009796106,0.00087387086,0.00016271144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017595858,0.0000108266795,0.0001468392,0.000017815264,0.000014172176,0.00002339299,0.000019595314,0.9909616,0.0001568411,0.002246388,0.00019051088,0.0061943806],"study_design_scores_gemma":[0.0000032429336,0.000009218878,0.000021939952,0.0000018841239,0.0000021007336,0.0000018220047,0.000003635396,0.9992729,0.000038515067,0.0005588012,0.000084865744,0.0000010532824],"about_ca_topic_score_codex":0.009652077,"about_ca_topic_score_gemma":0.0050408635,"teacher_disagreement_score":0.009652077,"about_ca_system_score_codex":0.0007684445,"about_ca_system_score_gemma":0.0010067674,"threshold_uncertainty_score":0.019191802},"labels":[],"label_agreement":null},{"id":"W4401585461","doi":"10.1007/978-3-031-65906-5_1","title":"Introduction","year":2024,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Philosophy","score_opus":0.004883964980824249,"score_gpt":0.16639782800059813,"score_spread":0.16151386301977388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401585461","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024934835,0.0030066927,0.003802139,0.0026288428,0.0059206025,0.00012096732,0.0017113215,0.0008745194,0.9816855],"genre_scores_gemma":[0.00061395124,0.0015156998,0.0009061548,0.00084438996,0.0006440459,0.000053665142,0.0011394792,0.00022083934,0.99406165],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992981,0.000065428896,0.000023797827,0.00013670382,0.00039976605,0.00007618326],"domain_scores_gemma":[0.9992318,0.00010336618,0.000026135838,0.00011613962,0.00037440914,0.00014820677],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00065410003,0.0010348004,0.0006015712,0.0019254275,0.0013736986,0.0048013236,0.0016553702,0.001817906,0.6324781],"category_scores_gemma":[0.0021788804,0.00037819255,0.0005942533,0.001779688,0.00058105815,0.0034932867,0.002668949,0.0019968743,0.55690163],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017821434,0.00003116014,0.0000622599,0.00013758913,0.0000017706227,0.00003855981,0.00009049997,0.00011741212,0.00035910192,0.023632186,0.8146424,0.16086912],"study_design_scores_gemma":[0.0000011936924,0.0000040391183,0.00004136976,0.00005020787,6.045497e-7,0.000021029835,0.000023635685,0.000017221406,0.000048231144,0.0023457957,0.9974446,0.0000019798938],"about_ca_topic_score_codex":0.0027242454,"about_ca_topic_score_gemma":0.0043012663,"teacher_disagreement_score":0.6324781,"about_ca_system_score_codex":0.001357057,"about_ca_system_score_gemma":0.0020698474,"threshold_uncertainty_score":0.52422535},"labels":[],"label_agreement":null},{"id":"W4401586117","doi":"10.1007/978-3-031-65906-5_4","title":"Pyomo Formulation of Electricity System Optimization Problem","year":2024,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electricity; Mathematical optimization; Computer science; Electricity system; Mathematics; Engineering; Electricity generation; Electrical engineering; Physics; Thermodynamics; Power (physics)","score_opus":0.0054516540123306576,"score_gpt":0.16826161604104498,"score_spread":0.1628099620287143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401586117","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063167177,0.0017746999,0.92000586,0.00093028607,0.00040183583,0.0000507472,0.00022238558,0.00021452141,0.0700829],"genre_scores_gemma":[0.60504013,0.0077244523,0.284457,0.00092049513,0.00092470885,0.00061235164,0.0008613039,0.00038901687,0.09907055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99984086,0.00006302164,0.000004727705,0.00002079633,0.000048471386,0.000022047845],"domain_scores_gemma":[0.9999105,0.000040154806,0.00000816551,0.0000063123207,0.000026251293,0.0000086163745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022361755,0.0005902073,0.00059819623,0.0001783706,0.00016455643,0.0009748566,0.0004772218,0.00041735457,0.006136609],"category_scores_gemma":[0.0004926576,0.00022344236,0.00039508528,0.00039220456,0.0003532961,0.00060885795,0.0007041865,0.0012331587,0.0009190948],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005319093,0.000058018384,0.000257689,0.00030778692,0.000038100876,0.00014018943,0.000058594174,0.6932605,0.0022244318,0.18643643,0.019134851,0.09803019],"study_design_scores_gemma":[0.00001027028,0.00006252317,0.00028333164,0.00003762449,0.000008860546,0.00007133285,0.00002758974,0.93326366,0.0002924262,0.053041913,0.012890311,0.000010125315],"about_ca_topic_score_codex":0.002301748,"about_ca_topic_score_gemma":0.002457667,"teacher_disagreement_score":0.006136609,"about_ca_system_score_codex":0.0003590252,"about_ca_system_score_gemma":0.0007973497,"threshold_uncertainty_score":0.020528972},"labels":[],"label_agreement":null},{"id":"W4401639746","doi":"10.3390/en17164075","title":"Optimizing Virtual Power Plant Management: A Novel MILP Algorithm to Minimize Levelized Cost of Energy, Technical Losses, and Greenhouse Gas Emissions","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Trois-Rivières; Université du Québec à Rimouski","funders":"","keywords":"Cost of electricity by source; Greenhouse gas; Power station; Environmental science; Energy (signal processing); Computer science; Greenhouse; Power (physics); Process engineering; Electricity generation; Environmental economics; Algorithm; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Economics; Agronomy; Physics","score_opus":0.010701307141175474,"score_gpt":0.21659769687893632,"score_spread":0.20589638973776084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401639746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016107127,0.00020624229,0.9774425,0.0002193644,0.00004629628,0.00006597295,0.0000635707,0.00030246112,0.005546409],"genre_scores_gemma":[0.6803273,0.00025786564,0.314157,0.00017943697,0.0000659192,0.0002879291,0.00020796224,0.00012320002,0.004393442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996842,0.00011607679,0.000010951266,0.000058613685,0.00007556301,0.000054593907],"domain_scores_gemma":[0.999622,0.00022119175,0.00005267968,0.000015095745,0.00006116763,0.000027870221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007447372,0.0012208843,0.0010055159,0.0005557514,0.00045764365,0.001196391,0.001081585,0.0011448899,0.0024452077],"category_scores_gemma":[0.0011572366,0.0004944472,0.00057531486,0.0006486158,0.00063218566,0.0008472989,0.0009400925,0.0010672102,0.00033327306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023900326,0.000017178088,0.00009489017,0.000017330065,0.000011397581,0.000021616044,0.0000107919905,0.9893968,0.00036564693,0.00179156,0.0004046414,0.00784425],"study_design_scores_gemma":[0.0000049469336,0.000009227372,0.000011279314,0.0000015924194,0.0000019067162,0.0000026910918,0.0000028704774,0.999102,0.00009510684,0.00061747927,0.00014973128,0.0000011969513],"about_ca_topic_score_codex":0.0041151377,"about_ca_topic_score_gemma":0.003939694,"teacher_disagreement_score":0.0041151377,"about_ca_system_score_codex":0.00071937393,"about_ca_system_score_gemma":0.0012905606,"threshold_uncertainty_score":0.008182347},"labels":[],"label_agreement":null},{"id":"W4401671684","doi":"10.1016/j.apenergy.2024.124141","title":"Efficient demand response location targeting for price spike mitigation by exploiting price-demand relationship","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Shanghai Jiao Tong University; National Natural Science Foundation of China","keywords":"Demand response; Spike (software development); On demand; Economics; Industrial organization; Microeconomics; Econometrics; Business; Natural resource economics; Commerce; Engineering","score_opus":0.00787546134417623,"score_gpt":0.20470674448775203,"score_spread":0.19683128314357579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401671684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.141764,0.00018794482,0.8400189,0.00057199824,0.00015117583,0.00004336154,0.00025130497,0.0009132281,0.01609799],"genre_scores_gemma":[0.98820156,0.000035536967,0.010245041,0.000059871054,0.000024837633,0.000008296865,0.000079842655,0.000021592856,0.0013234332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979776,0.000030933614,0.0000068362538,0.000051652998,0.00006910155,0.000043765904],"domain_scores_gemma":[0.9997081,0.00009167555,0.000052112162,0.00002897382,0.00010225782,0.000016911823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017321995,0.00037783218,0.00040753235,0.00021715256,0.0002232741,0.00068982615,0.00059674156,0.0003898264,0.0024598003],"category_scores_gemma":[0.0009627733,0.0001957152,0.00019977408,0.00045671428,0.000173196,0.000810314,0.0004935424,0.00046994357,0.0007045312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064464536,0.0003426498,0.005130298,0.00013374716,0.00007038926,0.00022073691,0.000068216774,0.6898412,0.0881464,0.019050024,0.0071136644,0.18923792],"study_design_scores_gemma":[0.000005791916,0.00004466966,0.0006060231,0.0000014133593,0.000008210905,0.000036650537,0.000017235112,0.9919837,0.004316694,0.0023656928,0.00060833816,0.000005519921],"about_ca_topic_score_codex":0.0011900647,"about_ca_topic_score_gemma":0.0024270965,"teacher_disagreement_score":0.0024598003,"about_ca_system_score_codex":0.00038349844,"about_ca_system_score_gemma":0.00044010588,"threshold_uncertainty_score":0.008228838},"labels":[],"label_agreement":null},{"id":"W4401693671","doi":"10.1109/ictem60690.2024.10631993","title":"Useful Application of Machine learning Methods in Smart Grids: A Mini Review","year":2024,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Machine learning; Artificial intelligence","score_opus":0.04192720137419192,"score_gpt":0.36494109933730323,"score_spread":0.3230138979631113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401693671","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000112364956,0.99658906,0.0008612643,0.000614076,0.0005319372,0.000010546881,0.000024442823,0.000012510883,0.0012437982],"genre_scores_gemma":[0.00081945077,0.9972479,0.0007483282,0.00026972024,0.00045029836,0.000010956546,0.000035693964,0.0000045458446,0.00041308737],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99941933,0.00013024147,0.0000847453,0.00008968019,0.00023688521,0.00003923221],"domain_scores_gemma":[0.99763894,0.0015365084,0.00017040597,0.00006201513,0.0005237008,0.00006840675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014824542,0.0012676965,0.0016007936,0.0038241968,0.0003154363,0.0015438,0.0011560763,0.0016014773,0.0042948425],"category_scores_gemma":[0.0029216378,0.00048016472,0.0010547161,0.004607833,0.00068932807,0.0026459757,0.000826777,0.0022056124,0.0021797349],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047493086,0.00008043927,0.00032291198,0.030092621,0.00017585947,0.0001476753,0.00008373188,0.0015790581,0.0008399484,0.011709947,0.03523518,0.9196851],"study_design_scores_gemma":[0.000013051406,0.00011510946,0.0009741131,0.011967991,0.00024456703,0.0006356167,0.000089119014,0.0008042127,0.00056203984,0.007939635,0.9766049,0.000049751718],"about_ca_topic_score_codex":0.0012786996,"about_ca_topic_score_gemma":0.0017060271,"teacher_disagreement_score":0.0042948425,"about_ca_system_score_codex":0.00083917874,"about_ca_system_score_gemma":0.0019111406,"threshold_uncertainty_score":0.0143677},"labels":[],"label_agreement":null},{"id":"W4401698253","doi":"10.3390/en17164128","title":"A Comprehensive Review of the Current Status of Smart Grid Technologies for Renewable Energies Integration and Future Trends: The Role of Machine Learning and Energy Storage Systems","year":2024,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":136,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Renewable energy; SCADA; Computer science; Systems engineering; Engineering; Sustainability; Environmental economics; Electrical engineering","score_opus":0.013196481047274255,"score_gpt":0.25242176688229373,"score_spread":0.23922528583501948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401698253","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002308182,0.9954275,0.0005669727,0.0004493193,0.00031568675,0.000010501897,0.00006533453,0.000018329385,0.0029154583],"genre_scores_gemma":[0.001027621,0.99720013,0.0005359496,0.0002264919,0.00018653118,0.000008472586,0.000065560074,0.000003342663,0.0007459365],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996923,0.000050529332,0.000055359455,0.00005014816,0.0001277341,0.000023905704],"domain_scores_gemma":[0.9992138,0.00043288237,0.00010018356,0.000025976658,0.00019264498,0.000034532295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005975734,0.0009451894,0.0011200384,0.0028879617,0.0002865627,0.0011435394,0.0006388303,0.0009788027,0.006235163],"category_scores_gemma":[0.0011276959,0.00034691492,0.00073703163,0.0043372046,0.00028124783,0.0017959183,0.00053179625,0.0012402772,0.0021048116],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004921029,0.00007682659,0.00021886984,0.055741876,0.00012208948,0.00018102567,0.000116713214,0.0010770465,0.0027879877,0.01023543,0.04485606,0.884537],"study_design_scores_gemma":[0.000005124236,0.00008239734,0.0006487886,0.008434132,0.00014574117,0.00045937303,0.000073373754,0.00019243358,0.00045423684,0.0028250953,0.9866583,0.000020960135],"about_ca_topic_score_codex":0.0011393027,"about_ca_topic_score_gemma":0.0021512255,"teacher_disagreement_score":0.006235163,"about_ca_system_score_codex":0.0005198125,"about_ca_system_score_gemma":0.0017782908,"threshold_uncertainty_score":0.020858645},"labels":[],"label_agreement":null},{"id":"W4401865493","doi":"10.1016/j.asoc.2024.112132","title":"Evaluation and benchmarking of research-based microgrid systems using FWZIC-VIKOR approach for sustainable energy management","year":2024,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Benchmarking; Microgrid; VIKOR method; Computer science; Sustainable energy; Energy management; Energy (signal processing); Systems engineering; Artificial intelligence; Renewable energy; Business; Engineering; Electrical engineering","score_opus":0.03404375907266492,"score_gpt":0.2899398550589697,"score_spread":0.25589609598630475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401865493","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92906183,0.0005768551,0.04355521,0.0003124066,0.00009192147,0.00047096677,0.0014137569,0.0011027484,0.023414208],"genre_scores_gemma":[0.9818471,0.0001087246,0.015772885,0.000016649592,0.0000042996858,0.00007945796,0.0010187093,0.000035599325,0.0011165559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99785596,0.0010630424,0.00011068085,0.00020849089,0.0005594825,0.00020243872],"domain_scores_gemma":[0.99805,0.0006232471,0.00012174892,0.0003779136,0.0007225209,0.00010463761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003756625,0.0007335771,0.0008390049,0.0017769234,0.0004801677,0.0015556345,0.0011839292,0.00074018916,0.0023353482],"category_scores_gemma":[0.004224994,0.00022591832,0.0006447346,0.0018061291,0.00047184003,0.0013620692,0.00090190425,0.00047025812,0.00040902512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012715051,0.0009134834,0.012151215,0.00078401295,0.0003126396,0.00021535388,0.000181017,0.85868895,0.009133972,0.008285236,0.0037454155,0.10431724],"study_design_scores_gemma":[0.000109575434,0.0012084536,0.010277328,0.00006051954,0.00010151821,0.00006144486,0.00031987825,0.97429436,0.0081413295,0.00186308,0.003533531,0.000028948061],"about_ca_topic_score_codex":0.0076199947,"about_ca_topic_score_gemma":0.008196682,"teacher_disagreement_score":0.0076199947,"about_ca_system_score_codex":0.0016459172,"about_ca_system_score_gemma":0.0011931225,"threshold_uncertainty_score":0.019867182},"labels":[],"label_agreement":null},{"id":"W4401880345","doi":"10.1109/icps59941.2024.10639994","title":"Non-Intrusive Load Monitoring-based Fuzzy Actor-Critic Reinforcement Learning Home Energy Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada; Carleton University","funders":"","keywords":"Reinforcement learning; Computer science; Energy management; Fuzzy logic; Load management; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Psychology; Social psychology; Electrical engineering","score_opus":0.005658647664936576,"score_gpt":0.2025508729208804,"score_spread":0.19689222525594383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401880345","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10743029,0.00031597263,0.8857643,0.00023498689,0.000083320374,0.00006803232,0.000055060853,0.0012770771,0.004770942],"genre_scores_gemma":[0.9790455,0.000041682622,0.019372402,0.000059784634,0.000011872116,0.00003951572,0.000039036095,0.000019259764,0.0013709404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968135,0.000090551344,0.000016202697,0.0000938553,0.000071580245,0.000046436846],"domain_scores_gemma":[0.99929523,0.0004177818,0.00008024156,0.00003689808,0.0001310183,0.000038761013],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084717333,0.00063457136,0.00072628434,0.00020523983,0.00023167185,0.0005059834,0.00076786656,0.0005645041,0.00122927],"category_scores_gemma":[0.0016707686,0.0002940718,0.00031434922,0.00015380947,0.00041073165,0.00038575806,0.0004559685,0.00089046045,0.00020930136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012962855,0.00010874257,0.0011161115,0.000041288866,0.000045989687,0.00006922964,0.00004543348,0.9536405,0.002341525,0.0010355944,0.00054880563,0.040877122],"study_design_scores_gemma":[0.0000038746803,0.000012721526,0.00007068246,0.0000011312044,0.000002147845,0.0000033331733,0.0000013380926,0.99944216,0.00023945568,0.00017704342,0.00004454236,0.0000014361127],"about_ca_topic_score_codex":0.0067238617,"about_ca_topic_score_gemma":0.00717802,"teacher_disagreement_score":0.0067238617,"about_ca_system_score_codex":0.0005576924,"about_ca_system_score_gemma":0.00058492663,"threshold_uncertainty_score":0.013369441},"labels":[],"label_agreement":null},{"id":"W4401930041","doi":"10.2139/ssrn.4937865","title":"Feasibility Study of Residential House Energy Management Systems Withrenewables and Battery Energy Storage","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Battery (electricity); Energy storage; Energy (signal processing); Energy management; Architectural engineering; Environmental science; Business; Engineering; Physics; Power (physics)","score_opus":0.008595481484608961,"score_gpt":0.20965939879346823,"score_spread":0.20106391730885928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401930041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9865574,0.000027226355,0.0091859475,0.00009250187,0.00001609095,0.00022501752,0.000109845234,0.00010523282,0.003680774],"genre_scores_gemma":[0.997764,0.000009853681,0.0014761484,0.0000060786947,0.0000028894087,0.000033602362,0.000040996558,0.000003395379,0.0006631133],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941874,0.00030892104,0.000022424972,0.00006489549,0.00011816257,0.000066837914],"domain_scores_gemma":[0.998338,0.0008585327,0.00007467755,0.00011851643,0.0005044051,0.00010600316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011116273,0.00035089292,0.00033011872,0.00033566006,0.00069043355,0.0005647261,0.0008042878,0.00055539625,0.005965074],"category_scores_gemma":[0.0016422747,0.00020477052,0.00031323667,0.00023517753,0.00041575628,0.0010550477,0.00038207276,0.00028947007,0.00047567335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.03354003,0.014554246,0.10370779,0.0018031566,0.00041858427,0.006675916,0.0017359931,0.31840965,0.33670992,0.015291051,0.006094598,0.16105904],"study_design_scores_gemma":[0.0018103541,0.028778821,0.049886182,0.000057221943,0.0003093908,0.0008293343,0.0040054643,0.7713542,0.13443966,0.0033924615,0.0050497656,0.00008721152],"about_ca_topic_score_codex":0.0036527417,"about_ca_topic_score_gemma":0.0027195197,"teacher_disagreement_score":0.005965074,"about_ca_system_score_codex":0.00057817355,"about_ca_system_score_gemma":0.00085679657,"threshold_uncertainty_score":0.019955218},"labels":[],"label_agreement":null},{"id":"W4401978678","doi":"10.3390/app14177618","title":"Comparison between Blockchain P2P Energy Trading and Conventional Incentive Mechanisms for Distributed Energy Resources—A Rural Microgrid Use Case Study","year":2024,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Trois-Rivières; Université du Québec à Rimouski","funders":"","keywords":"Blockchain; Microgrid; Incentive; Business; Distributed generation; Environmental economics; Computer science; Economics; Computer security; Microeconomics; Renewable energy; Control (management); Engineering; Electrical engineering","score_opus":0.028269572918911395,"score_gpt":0.26196516590431834,"score_spread":0.23369559298540696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401978678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95812255,0.0005477033,0.02425514,0.00032947396,0.000033594853,0.0003827604,0.00027675662,0.00019689415,0.015855206],"genre_scores_gemma":[0.9928698,0.00017399366,0.0055539906,0.000022481188,0.0000058053056,0.0000738273,0.00009257978,0.000013770563,0.0011937962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988299,0.00059909327,0.000050244817,0.000101195765,0.0002593328,0.00016025527],"domain_scores_gemma":[0.99594057,0.0028155516,0.00021786016,0.00034471057,0.0005174489,0.00016389991],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021378929,0.0005885664,0.0006416154,0.0007176973,0.0006454573,0.0012509831,0.0011326553,0.0009996903,0.0036551272],"category_scores_gemma":[0.0039246185,0.00020679855,0.00040662155,0.0011348067,0.0007311232,0.0021930742,0.00090773904,0.0005411671,0.00030412202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003799206,0.0016764315,0.014602279,0.0011509951,0.0002234967,0.0018069865,0.00051302736,0.8386797,0.011401408,0.032434214,0.0030351824,0.09067708],"study_design_scores_gemma":[0.00043494103,0.0035987936,0.0069659622,0.000060047514,0.00009293522,0.00041544918,0.0010023484,0.9674128,0.005587801,0.008275314,0.0061008395,0.000052730604],"about_ca_topic_score_codex":0.0070421128,"about_ca_topic_score_gemma":0.0055264886,"teacher_disagreement_score":0.0070421128,"about_ca_system_score_codex":0.001242609,"about_ca_system_score_gemma":0.0008710705,"threshold_uncertainty_score":0.014002264},"labels":[],"label_agreement":null},{"id":"W4402031309","doi":"10.32920/26871388","title":"Smart Rainwater Storage - Development of a Smart Meter Prototype Enabling Local Rule-Based Predictive Real-Time Control and User Interaction","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Rainwater harvesting; Control (management); Computer science; Real-time computing; Smart meter; Model predictive control; Embedded system; Smart grid; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.009502272671452558,"score_gpt":0.21439728881034592,"score_spread":0.20489501613889335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402031309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23245905,0.00018728033,0.71365696,0.00066408666,0.00035077403,0.0013981487,0.0015287247,0.0305198,0.019235196],"genre_scores_gemma":[0.72399426,0.00011694544,0.2548257,0.00018878366,0.000030050118,0.00057023065,0.0011351428,0.0008064466,0.018332435],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995994,0.00007891592,0.00002976048,0.00008879629,0.00016407087,0.000038990023],"domain_scores_gemma":[0.9994444,0.00014761872,0.000029950317,0.00016408987,0.00016041566,0.000053586824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005800301,0.00040916452,0.00050507754,0.00021373181,0.00018981622,0.00070917176,0.0016444025,0.00074988365,0.012139161],"category_scores_gemma":[0.0013045117,0.0002699374,0.00029061764,0.00013724336,0.00032593135,0.00095920026,0.0003832516,0.0005091106,0.0022953933],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012660419,0.0011699465,0.0055443975,0.00097402645,0.00011916501,0.0014361404,0.0009996919,0.060548365,0.53291106,0.0077591906,0.019153768,0.36811826],"study_design_scores_gemma":[0.0004404363,0.0023601693,0.0065024733,0.00006505978,0.000073869895,0.000968335,0.00023709596,0.44570318,0.4622749,0.0019970357,0.07926696,0.000110513785],"about_ca_topic_score_codex":0.0009266854,"about_ca_topic_score_gemma":0.00072816946,"teacher_disagreement_score":0.012139161,"about_ca_system_score_codex":0.0003006751,"about_ca_system_score_gemma":0.0004086695,"threshold_uncertainty_score":0.0406096},"labels":[],"label_agreement":null},{"id":"W4402031359","doi":"10.32920/26871388.v1","title":"Smart Rainwater Storage - Development of a Smart Meter Prototype Enabling Local Rule-Based Predictive Real-Time Control and User Interaction","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Rainwater harvesting; Smart meter; Model predictive control; Metre; Control (management); Computer science; Real-time computing; Environmental science; Smart grid; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.009502272671452558,"score_gpt":0.21439728881034592,"score_spread":0.20489501613889335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402031359","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23245905,0.00018728033,0.71365696,0.00066408666,0.00035077403,0.0013981487,0.0015287247,0.0305198,0.019235196],"genre_scores_gemma":[0.72399426,0.00011694544,0.2548257,0.00018878366,0.000030050118,0.00057023065,0.0011351428,0.0008064466,0.018332435],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995994,0.00007891592,0.00002976048,0.00008879629,0.00016407087,0.000038990023],"domain_scores_gemma":[0.9994444,0.00014761872,0.000029950317,0.00016408987,0.00016041566,0.000053586824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005800301,0.00040916452,0.00050507754,0.00021373181,0.00018981622,0.00070917176,0.0016444025,0.00074988365,0.012139161],"category_scores_gemma":[0.0013045117,0.0002699374,0.00029061764,0.00013724336,0.00032593135,0.00095920026,0.0003832516,0.0005091106,0.0022953933],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012660419,0.0011699465,0.0055443975,0.00097402645,0.00011916501,0.0014361404,0.0009996919,0.060548365,0.53291106,0.0077591906,0.019153768,0.36811826],"study_design_scores_gemma":[0.0004404363,0.0023601693,0.0065024733,0.00006505978,0.000073869895,0.000968335,0.00023709596,0.44570318,0.4622749,0.0019970357,0.07926696,0.000110513785],"about_ca_topic_score_codex":0.0009266854,"about_ca_topic_score_gemma":0.00072816946,"teacher_disagreement_score":0.012139161,"about_ca_system_score_codex":0.0003006751,"about_ca_system_score_gemma":0.0004086695,"threshold_uncertainty_score":0.0406096},"labels":[],"label_agreement":null},{"id":"W4402039345","doi":"10.1016/j.asoc.2024.112183","title":"The adaptive consensus reaching process with the ER-PSO interaction mechanism and its application in public charging stations evaluation","year":2024,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Mechanism (biology); Process (computing); Distributed computing","score_opus":0.0217486425052865,"score_gpt":0.25390547716354134,"score_spread":0.23215683465825485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402039345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07518523,0.0001797398,0.9170264,0.00016617936,0.00007541065,0.00012958141,0.000019215864,0.00046973038,0.006748434],"genre_scores_gemma":[0.9535815,0.000065895605,0.04419475,0.000030839437,0.000015588268,0.000095211646,0.000028399138,0.00003037713,0.001957428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988231,0.00044523375,0.000048621205,0.00019772092,0.0003667639,0.000118592114],"domain_scores_gemma":[0.9984518,0.00078747974,0.000116015646,0.00010715766,0.00047733894,0.000060129496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025747395,0.00055661995,0.0009634588,0.00070285297,0.00063518336,0.0009055587,0.0010234368,0.0012079104,0.001975601],"category_scores_gemma":[0.0044461037,0.00021937783,0.0006154763,0.00066514517,0.00064050435,0.0012939071,0.0009844796,0.0007124589,0.00015848533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029986384,0.0001970612,0.0014934889,0.00016028727,0.00007640328,0.00014309326,0.00015987706,0.8530788,0.0070905113,0.02235872,0.0010155463,0.113926284],"study_design_scores_gemma":[0.000007855875,0.000051135998,0.00012867646,0.0000020244997,0.0000054187935,0.000012032568,0.000010855321,0.9980714,0.00069613435,0.0008693157,0.00014038743,0.0000049263026],"about_ca_topic_score_codex":0.0032178252,"about_ca_topic_score_gemma":0.0014733992,"teacher_disagreement_score":0.0032178252,"about_ca_system_score_codex":0.00050934387,"about_ca_system_score_gemma":0.00096499023,"threshold_uncertainty_score":0.013616681},"labels":[],"label_agreement":null},{"id":"W4402054216","doi":"10.3390/s24175619","title":"HYDROSAFE: A Hybrid Deterministic-Probabilistic Model for Synthetic Appliance Profiles Generation","year":2024,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Computer science; Cluster analysis; Dynamic time warping; Image warping; Synthetic data; Algorithm; Data mining; Artificial intelligence","score_opus":0.023029295719829958,"score_gpt":0.2302490800865179,"score_spread":0.20721978436668795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402054216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06559836,0.00011158997,0.92716974,0.0003131832,0.000085334505,0.00012848938,0.0017982404,0.0020637868,0.0027312706],"genre_scores_gemma":[0.8722772,0.00014787726,0.12155384,0.00012369826,0.000040136547,0.00029995665,0.002834482,0.0002098493,0.0025130084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966836,0.0000920336,0.000022019289,0.00007518767,0.00011409308,0.000028393435],"domain_scores_gemma":[0.9989942,0.0005708587,0.00011361724,0.000107739426,0.0001653673,0.00004822598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007001147,0.0005527652,0.00041145625,0.0005130569,0.00025211796,0.00072404667,0.0013188682,0.0007266603,0.001599765],"category_scores_gemma":[0.0033534183,0.00033522065,0.000611711,0.00059739343,0.00040114493,0.00073839794,0.0006931383,0.00072600617,0.00033711395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041485197,0.000024931684,0.0009749553,0.000022545111,0.000013211161,0.00003339019,0.000018307277,0.98750824,0.00071906723,0.0026687267,0.0007403634,0.0072347126],"study_design_scores_gemma":[0.0000031988463,0.0000067514834,0.00011392672,0.0000012014427,0.0000011683492,0.000007414007,0.000002652144,0.99862874,0.00022047393,0.0007821811,0.00022928984,0.000003134783],"about_ca_topic_score_codex":0.008721503,"about_ca_topic_score_gemma":0.008352062,"teacher_disagreement_score":0.008721503,"about_ca_system_score_codex":0.00057847705,"about_ca_system_score_gemma":0.0007259861,"threshold_uncertainty_score":0.017341495},"labels":[],"label_agreement":null},{"id":"W4402093606","doi":"10.52417/ojes.v5i2.619","title":"PHASOR ANALYSIS OF DECENTRALIZED GRID-CONNECTED RESIDENTIAL SOLAR FARM: ADDRESSING NIGERIA ELECTRICITY CAPACITY ISSUES","year":2024,"lang":"en","type":"article","venue":"Open Journal of Engineering Science (ISSN 2734-2115)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Phasor; Grid; Electricity; Environmental economics; Photovoltaic system; Business; Distributed generation; Environmental science; Computer science; Electrical engineering; Engineering; Electric power system; Renewable energy; Geography; Economics; Power (physics)","score_opus":0.025647675746510945,"score_gpt":0.2882234298835387,"score_spread":0.2625757541370278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402093606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9478136,0.000088975845,0.040093124,0.00009686721,0.000014766224,0.000066914174,0.00027484747,0.00020540493,0.011345486],"genre_scores_gemma":[0.9973699,0.0000413413,0.0019110119,0.0000026547032,0.0000014216271,0.000008288486,0.00005910961,0.0000048481224,0.00060139305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999479,0.00001914639,0.0000029033372,0.000007808613,0.00001615717,0.000006046857],"domain_scores_gemma":[0.9998735,0.000059266637,0.0000134116635,0.000009833109,0.00003799317,0.0000058584847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011166768,0.00021757346,0.00024160292,0.00023188732,0.00017166646,0.00034064817,0.0001462952,0.00019757761,0.0016771754],"category_scores_gemma":[0.0003817036,0.00010900081,0.00010868031,0.0003222813,0.00009400837,0.00029287036,0.00012966199,0.00020112954,0.00016352472],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026354377,0.00014358285,0.017432451,0.00020520212,0.000045970104,0.00061533606,0.00030602157,0.9238819,0.017836416,0.0025770448,0.0008671504,0.035825346],"study_design_scores_gemma":[0.000020722227,0.00014182695,0.009974873,0.000012647036,0.00001616714,0.00008999127,0.00026848962,0.98418856,0.0038878433,0.00063534797,0.0007571531,0.000006478463],"about_ca_topic_score_codex":0.005429286,"about_ca_topic_score_gemma":0.00752852,"teacher_disagreement_score":0.005429286,"about_ca_system_score_codex":0.00019069386,"about_ca_system_score_gemma":0.00024040736,"threshold_uncertainty_score":0.010795414},"labels":[],"label_agreement":null},{"id":"W4402157456","doi":"10.1109/icc51166.2024.10622296","title":"Modeling Advanced Metering Infrastructure with Bidirectional Traffic in Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Metering mode; Computer science; Smart grid; Computer network; Engineering; Electrical engineering","score_opus":0.005082309820022651,"score_gpt":0.18771717006601252,"score_spread":0.18263486024598988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402157456","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23108183,0.00053902064,0.7424435,0.0018240005,0.00018799669,0.00013004178,0.00071868143,0.00055571424,0.02251922],"genre_scores_gemma":[0.9667455,0.00050450553,0.02305819,0.0001167681,0.000060515726,0.00011548753,0.00023983147,0.000084066174,0.009075256],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946946,0.00019696442,0.000016623193,0.00009063393,0.00009490294,0.00013126142],"domain_scores_gemma":[0.9989802,0.0005216996,0.00016372329,0.00006541201,0.00019270835,0.00007625838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010477089,0.00080885476,0.00067820307,0.0007864584,0.0005369912,0.0016233218,0.0014989418,0.001743197,0.0024629543],"category_scores_gemma":[0.0029910367,0.00051756715,0.0006255756,0.0009557761,0.0012195684,0.0030992841,0.0010021954,0.0010398582,0.00037215507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001269595,0.00001359117,0.00036659485,0.0000065803506,0.0000034682755,0.000021512486,0.000018260125,0.97856253,0.00023703386,0.019728228,0.0001839863,0.000845475],"study_design_scores_gemma":[0.0000019828296,0.0000038565677,0.000044042066,0.0000013866164,0.0000010395513,0.0000030982305,0.000007819772,0.996046,0.00002928143,0.0037230626,0.00013632029,0.0000020006141],"about_ca_topic_score_codex":0.02740302,"about_ca_topic_score_gemma":0.01588699,"teacher_disagreement_score":0.02740302,"about_ca_system_score_codex":0.0025414447,"about_ca_system_score_gemma":0.0012356191,"threshold_uncertainty_score":0.05448705},"labels":[],"label_agreement":null},{"id":"W4402264789","doi":"10.1109/tqcebt59414.2024.10545306","title":"Utilizing Deep Reinforcement Learning for Energy Trading in Microgrids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Reinforcement learning; Computer science; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Structural engineering; Mathematics","score_opus":0.012375240121973708,"score_gpt":0.21676992629815253,"score_spread":0.2043946861761788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402264789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.096988246,0.0006020139,0.8957766,0.00061268534,0.00007091394,0.000049933886,0.000062755134,0.0008272234,0.0050095753],"genre_scores_gemma":[0.97489387,0.00010399178,0.023941502,0.00009548293,0.000016218426,0.000027146949,0.000036831334,0.000021399484,0.00086354197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973494,0.0001066964,0.000012584198,0.000048324146,0.000054862245,0.000042607615],"domain_scores_gemma":[0.9991714,0.0005147778,0.00010935251,0.000052837277,0.00010459647,0.00004708547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010287513,0.00054370385,0.0006241736,0.00025438063,0.00024268618,0.00070973096,0.000819198,0.0006019171,0.0011108753],"category_scores_gemma":[0.0027659093,0.0002880531,0.00025267748,0.00024063945,0.00060683925,0.00086327177,0.0008759313,0.0008818515,0.00016425733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031304407,0.000039818093,0.0007280038,0.00002237225,0.000018337723,0.000029837278,0.000015510555,0.9771707,0.00059101905,0.0022531406,0.00026942845,0.01883046],"study_design_scores_gemma":[0.0000022941547,0.0000070723795,0.000028653138,0.0000011578168,0.0000012271578,0.0000024293947,0.0000015245566,0.99886155,0.00010531642,0.0009231075,0.000064717446,9.925683e-7],"about_ca_topic_score_codex":0.004684574,"about_ca_topic_score_gemma":0.0053367773,"teacher_disagreement_score":0.004684574,"about_ca_system_score_codex":0.00080314174,"about_ca_system_score_gemma":0.0008603234,"threshold_uncertainty_score":0.009314597},"labels":[],"label_agreement":null},{"id":"W4402303173","doi":"10.1109/icesep62218.2024.10651950","title":"A Peer-to-Peer Trading Mechanism Considering Preferences: A Two-Stage Game Theory Approach","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Game theory; Peer-to-peer; Computer science; Mechanism (biology); Peer review; Microeconomics; Distributed computing; Economics","score_opus":0.029513192144324213,"score_gpt":0.23822780281830455,"score_spread":0.20871461067398034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402303173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008660728,0.00019780977,0.98562026,0.00024348497,0.000056275276,0.00020232696,0.000024391107,0.000069740054,0.004924983],"genre_scores_gemma":[0.75296295,0.00076643133,0.23814672,0.00024230161,0.00013332546,0.0005422746,0.000051910523,0.000047734917,0.007106427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9974577,0.0011673204,0.0001224119,0.00041038494,0.00060961343,0.0002326049],"domain_scores_gemma":[0.9989229,0.0005945059,0.0000995482,0.00007447757,0.00020601996,0.0001025736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022431903,0.0011258963,0.0016188596,0.00078201824,0.0011215375,0.0018909681,0.0033641031,0.0021728138,0.0028434303],"category_scores_gemma":[0.0029752757,0.00069031026,0.0014866331,0.00092018384,0.001279547,0.004023315,0.0014304379,0.0015723648,0.00038784771],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000198596,0.00033150904,0.0010070879,0.0004791541,0.0002520865,0.0010539999,0.0005516823,0.52041787,0.010236491,0.4084794,0.0025972333,0.054394823],"study_design_scores_gemma":[0.00004324948,0.00013082377,0.00010168792,0.000014572034,0.000051307892,0.00022915332,0.00005462207,0.93875176,0.00094677997,0.057459146,0.0021676493,0.000049242233],"about_ca_topic_score_codex":0.002247026,"about_ca_topic_score_gemma":0.0016143111,"teacher_disagreement_score":0.0033641031,"about_ca_system_score_codex":0.0012217811,"about_ca_system_score_gemma":0.0017467787,"threshold_uncertainty_score":0.011863291},"labels":[],"label_agreement":null},{"id":"W4402304588","doi":"10.3233/faia240757","title":"Winning the 2023 CityLearn Challenge: A Community-Based Hierarchical Energy Systems Coordination Algorithm","year":2024,"lang":"en","type":"book-chapter","venue":"Frontiers in artificial intelligence and applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Energy (signal processing); Algorithm; Distributed computing; Mathematics","score_opus":0.031809150053077946,"score_gpt":0.2417977943806637,"score_spread":0.20998864432758577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402304588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022207413,0.0009512383,0.95529807,0.0010338858,0.00034288206,0.00016666618,0.00037520568,0.0031746507,0.016449988],"genre_scores_gemma":[0.28767034,0.0005601442,0.6842599,0.0009874275,0.00021476422,0.0003741403,0.0020854438,0.00089294143,0.022954952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956495,0.00013552386,0.000019540621,0.00011685962,0.00011795612,0.000045126926],"domain_scores_gemma":[0.99919325,0.00044815737,0.000028789851,0.00010314872,0.00016204713,0.00006458908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010831971,0.0008477883,0.0007893942,0.00039116712,0.00061851915,0.0012571064,0.0017805523,0.0013535531,0.006087762],"category_scores_gemma":[0.0028819866,0.00027035232,0.0006027375,0.0007298246,0.00051978545,0.0013340381,0.0016454825,0.0018151704,0.0014423205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019585481,0.00018273407,0.0013019468,0.0001738943,0.00009613453,0.0001144448,0.000108320884,0.5056571,0.00246055,0.03339992,0.0582259,0.39808327],"study_design_scores_gemma":[0.000036313202,0.000038349266,0.00011762461,0.000009891962,0.000007697897,0.000024096122,0.00002120388,0.97748315,0.00088463153,0.01572269,0.005647023,0.0000072343328],"about_ca_topic_score_codex":0.0072528212,"about_ca_topic_score_gemma":0.011366927,"teacher_disagreement_score":0.0072528212,"about_ca_system_score_codex":0.0008544156,"about_ca_system_score_gemma":0.001484046,"threshold_uncertainty_score":0.020365536},"labels":[],"label_agreement":null},{"id":"W4402474043","doi":"10.1109/ccece59415.2024.10667119","title":"Constrained Deep Reinforcement Learning for Energy Management of Community Multi-Energy Systems","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Ministry of Higher Education","keywords":"Reinforcement learning; Computer science; Energy management; Energy (signal processing); Artificial intelligence; Human–computer interaction; Physics","score_opus":0.019058729411204674,"score_gpt":0.22581802093211809,"score_spread":0.2067592915209134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474043","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088886425,0.0008285868,0.9035868,0.00083632284,0.000091837464,0.000068705325,0.00015728411,0.0007523963,0.0047916896],"genre_scores_gemma":[0.976611,0.0001124368,0.02183813,0.00013366854,0.000020740525,0.000052474803,0.000105512445,0.000024871782,0.0011012452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962366,0.00014259829,0.000015005002,0.0000774986,0.00006536288,0.00007577926],"domain_scores_gemma":[0.99916387,0.00048935943,0.00010703607,0.000047379883,0.00012491154,0.00006738022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010357521,0.0007197469,0.00078735716,0.00031079713,0.00029637216,0.0006937406,0.0011216459,0.00079139235,0.0014228494],"category_scores_gemma":[0.0029012028,0.00032556587,0.00031853237,0.00035019463,0.0006796741,0.0008462689,0.0010927671,0.0014143558,0.00015736153],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024269582,0.00003896917,0.00068217755,0.000022949704,0.000019385709,0.000029174813,0.000015784539,0.98532563,0.00024512297,0.002613604,0.0004742287,0.010508715],"study_design_scores_gemma":[0.0000019217125,0.000004888446,0.000031433898,0.0000012123027,9.95474e-7,0.0000012813849,0.0000016518005,0.9989827,0.000036952875,0.00087942876,0.00005662447,7.796498e-7],"about_ca_topic_score_codex":0.014208172,"about_ca_topic_score_gemma":0.014177357,"teacher_disagreement_score":0.014208172,"about_ca_system_score_codex":0.0011913163,"about_ca_system_score_gemma":0.0014209909,"threshold_uncertainty_score":0.028250933},"labels":[],"label_agreement":null},{"id":"W4402474262","doi":"10.1109/ccece59415.2024.10667159","title":"A Tight Convex Model of Optimal Gas Flow Problem in Local Networks: Distributed Gas and Power Scheduling Application","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"Huawei Technologies","keywords":"Computer science; Power flow; Mathematical optimization; Scheduling (production processes); Regular polygon; Distributed computing; Flow (mathematics); Power (physics); Electric power system; Mathematics; Physics; Mechanics","score_opus":0.00493849488592818,"score_gpt":0.1862610113136229,"score_spread":0.18132251642769473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011687428,0.00013853938,0.9844811,0.0001856544,0.000024223817,0.00002317695,0.0000357769,0.00006496184,0.00335911],"genre_scores_gemma":[0.9198162,0.00059418293,0.07291445,0.00010631363,0.000065582746,0.00013670627,0.0001299739,0.0000694697,0.006167131],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954706,0.0001469212,0.000010634901,0.00011948779,0.00010774325,0.00006822554],"domain_scores_gemma":[0.99956423,0.0002129499,0.00006596529,0.000036073223,0.000083954634,0.00003669414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007613015,0.00079981604,0.00092856487,0.00038612325,0.00052772963,0.0011975266,0.0009423425,0.0010034518,0.001893523],"category_scores_gemma":[0.0014780711,0.00037941133,0.0006444016,0.00070565403,0.0010300428,0.0016149407,0.0010302186,0.001648509,0.00020898867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014484866,0.000010588041,0.00009121654,0.00001755923,0.0000045376505,0.00003128215,0.000017500886,0.98420495,0.00051550445,0.011475276,0.00037304984,0.0032440836],"study_design_scores_gemma":[0.0000015777479,0.0000063846765,0.000016472226,8.19971e-7,8.9385196e-7,0.0000033432852,0.000004936906,0.99781775,0.00009399123,0.0019115882,0.00014124118,0.0000011211566],"about_ca_topic_score_codex":0.0101107685,"about_ca_topic_score_gemma":0.005791292,"teacher_disagreement_score":0.0101107685,"about_ca_system_score_codex":0.0014924095,"about_ca_system_score_gemma":0.0014062064,"threshold_uncertainty_score":0.020103812},"labels":[],"label_agreement":null},{"id":"W4402474475","doi":"10.1109/ccece59415.2024.10667192","title":"Flexibility-Oriented Scheduling of Smart Energy Hubs Considering Integrated Demand Response Programs","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"","keywords":"Demand response; Flexibility (engineering); Computer science; Scheduling (production processes); Distributed computing; Embedded system; Engineering; Electrical engineering; Operations management","score_opus":0.016580514618701858,"score_gpt":0.23215971230399768,"score_spread":0.21557919768529582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46106437,0.00030019827,0.5158938,0.0005675394,0.000097050055,0.00024777732,0.0007107838,0.00049232953,0.020626059],"genre_scores_gemma":[0.98743975,0.00004964931,0.010424579,0.000023716228,0.000008840615,0.00004360635,0.000117180636,0.000036416885,0.0018561564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944824,0.00018164548,0.000015679418,0.000094735275,0.00007409623,0.00018547947],"domain_scores_gemma":[0.9992799,0.00037672,0.00010713368,0.00002785553,0.00008905935,0.00011931093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009659311,0.0007086016,0.00095090887,0.00041372827,0.0003993212,0.0011389815,0.00079525163,0.00067736465,0.0036887603],"category_scores_gemma":[0.001503076,0.0005425018,0.00065701216,0.0005137824,0.00048003564,0.0005819205,0.00064946606,0.0006942409,0.00023329016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004957728,0.000014056596,0.000195507,0.000010641677,0.000006585286,0.000030000792,0.000010015568,0.9967199,0.00022229104,0.001385642,0.00014241856,0.0012132548],"study_design_scores_gemma":[0.0000064421424,0.000015438369,0.00007865369,0.0000012972018,0.000002664296,0.0000030412884,0.00000983832,0.9991504,0.0000799497,0.0005538709,0.0000967576,0.000001629363],"about_ca_topic_score_codex":0.014102344,"about_ca_topic_score_gemma":0.010238358,"teacher_disagreement_score":0.014102344,"about_ca_system_score_codex":0.0012603686,"about_ca_system_score_gemma":0.0013174402,"threshold_uncertainty_score":0.028040528},"labels":[],"label_agreement":null},{"id":"W4402474755","doi":"10.1109/ccece59415.2024.10667165","title":"Influence of Demand Response Suppliers’ Interests on Economic Demand Response","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Response time; On demand; Industrial organization; Derived demand; Business; Microeconomics; Economics; Computer science; Demand curve; Commerce; Engineering; Electrical engineering","score_opus":0.006177141995288851,"score_gpt":0.22163327717794334,"score_spread":0.2154561351826545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98119503,0.00013642029,0.004831144,0.00028496305,0.000013610328,0.000037551697,0.00019550233,0.00003381953,0.01327199],"genre_scores_gemma":[0.99941266,0.000020146786,0.00017306086,0.000020372434,0.0000023047123,0.0000071402815,0.00003681861,0.000007724219,0.0003198202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9971776,0.0018094387,0.00008595452,0.00016563239,0.00044084934,0.0003204303],"domain_scores_gemma":[0.9659589,0.029953372,0.0006770782,0.00077964197,0.0021904754,0.00044052987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004702042,0.0004059012,0.00053505227,0.000639914,0.00042626474,0.0015420333,0.0005664034,0.0007267427,0.0042536175],"category_scores_gemma":[0.024036443,0.00028334715,0.00044241917,0.0008384818,0.00065561663,0.0017313542,0.0010367617,0.0009217576,0.0005252946],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004525931,0.00059294276,0.085255995,0.0003459908,0.00022715656,0.0019302306,0.0008634815,0.8373514,0.027763613,0.010466012,0.0018112877,0.028865995],"study_design_scores_gemma":[0.00018486485,0.0018224987,0.10077527,0.00005150027,0.0001524778,0.00055835856,0.0037168975,0.8504827,0.031555127,0.0074072005,0.0031419564,0.00015116762],"about_ca_topic_score_codex":0.0029103237,"about_ca_topic_score_gemma":0.0015400508,"teacher_disagreement_score":0.004702042,"about_ca_system_score_codex":0.0012728294,"about_ca_system_score_gemma":0.00035445223,"threshold_uncertainty_score":0.024867117},"labels":[],"label_agreement":null},{"id":"W4402475009","doi":"10.1109/ccece59415.2024.10667294","title":"Ancillary Services in North America: An Overview","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science","score_opus":0.015581927376309512,"score_gpt":0.22739507985344362,"score_spread":0.21181315247713411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402475009","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008247466,0.92576385,0.001938527,0.005309029,0.0009299691,0.0000394861,0.00034281725,0.00008344958,0.05734542],"genre_scores_gemma":[0.039528765,0.9474682,0.0022917984,0.0016171285,0.00074262696,0.00003410387,0.0003591253,0.00001949173,0.007938733],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995958,0.00006935575,0.000044061493,0.000057652116,0.00018214172,0.00005090266],"domain_scores_gemma":[0.99905974,0.00025917488,0.0001750153,0.000016356425,0.00041403866,0.00007573889],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005247912,0.00041369806,0.00026644408,0.0038802554,0.0005429092,0.0019948957,0.00049549015,0.0007313573,0.0034334555],"category_scores_gemma":[0.00080111163,0.00020226614,0.00030970774,0.007034471,0.00042443562,0.0018492654,0.0005591745,0.0008925021,0.0005367778],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000068877045,0.00016983425,0.008550105,0.0055921637,0.00005841779,0.0005825742,0.00043721352,0.0031661252,0.0010797192,0.033402495,0.10469115,0.8422013],"study_design_scores_gemma":[0.0000046380806,0.00009683674,0.023294218,0.0034468442,0.000053397045,0.00074626703,0.00067307823,0.0011016445,0.0003555889,0.004593391,0.9656038,0.000030264628],"about_ca_topic_score_codex":0.034983955,"about_ca_topic_score_gemma":0.049336784,"teacher_disagreement_score":0.034983955,"about_ca_system_score_codex":0.0027344457,"about_ca_system_score_gemma":0.004231517,"threshold_uncertainty_score":0.06956065},"labels":[],"label_agreement":null},{"id":"W4402501796","doi":"10.11159/icert24.109","title":"A Peak-Shaving-Oriented Incentive Mechanism for Smart Grids","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Framework Programme; European Commission","keywords":"Incentive; Mechanism (biology); Peaking power plant; Computer science; Smart grid; Electrical engineering; Engineering; Renewable energy; Microeconomics; Physics; Distributed generation; Economics","score_opus":0.009763718695158165,"score_gpt":0.22001556927289517,"score_spread":0.21025185057773702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402501796","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21546407,0.0011105285,0.77000374,0.0012451299,0.00034176084,0.00051141955,0.0005116205,0.0021586018,0.00865305],"genre_scores_gemma":[0.9042362,0.00022990651,0.09227749,0.00013964403,0.000056724668,0.000196397,0.00020481898,0.000060717724,0.0025980999],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99885535,0.0004906621,0.00009488463,0.00016883909,0.00021898402,0.00017126728],"domain_scores_gemma":[0.99672544,0.001397408,0.0004683787,0.0006626625,0.00036322512,0.00038283117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002915122,0.0005285542,0.0008228324,0.0006088147,0.0008578611,0.0010122518,0.002528034,0.0012423972,0.0038103326],"category_scores_gemma":[0.006676185,0.0002704624,0.0006506277,0.0009219381,0.00078236597,0.002350237,0.0016917025,0.0013056889,0.00049021],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001718787,0.0011123217,0.006558901,0.0008601187,0.00022518847,0.0006041176,0.00067094545,0.5567389,0.02464147,0.15918063,0.014723793,0.23296481],"study_design_scores_gemma":[0.00033178544,0.0004577224,0.0011074385,0.00004620232,0.00004671285,0.0003777984,0.0001113998,0.91802585,0.004854323,0.06014124,0.014437932,0.000061595834],"about_ca_topic_score_codex":0.0011373503,"about_ca_topic_score_gemma":0.0010009912,"teacher_disagreement_score":0.0038103326,"about_ca_system_score_codex":0.0007944445,"about_ca_system_score_gemma":0.0013759952,"threshold_uncertainty_score":0.015416861},"labels":[],"label_agreement":null},{"id":"W4402511722","doi":"10.1016/j.scs.2024.105813","title":"Energy storage enabling renewable energy communities: An urban context-aware approach and case study using agent-based modeling and optimization","year":2024,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Khalifa University of Science, Technology and Research","keywords":"Renewable energy; Context (archaeology); Environmental science; Energy storage; Environmental economics; Energy (signal processing); Computer science; Civil engineering; Architectural engineering; Environmental resource management; Engineering; Economics; Geography; Power (physics)","score_opus":0.020390810894999774,"score_gpt":0.21948733502001377,"score_spread":0.199096524125014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402511722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8994743,0.00036662424,0.07456857,0.00074237696,0.000044879514,0.00024900495,0.00036973727,0.00031558948,0.023868881],"genre_scores_gemma":[0.9889959,0.00011549218,0.009242002,0.000014060129,0.0000039191445,0.000039726117,0.000057355835,0.00001358633,0.0015179229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996592,0.00018739639,0.000010869605,0.00003785047,0.000054664382,0.000050052182],"domain_scores_gemma":[0.9994686,0.00033892953,0.000033208475,0.000040161838,0.00006733614,0.000051742176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051035057,0.00044936128,0.00043838896,0.00046640815,0.0010870384,0.001731415,0.00075016596,0.0011161279,0.0013761387],"category_scores_gemma":[0.00081071287,0.00025066308,0.0004440937,0.0009521704,0.00060487824,0.0012797266,0.0010656309,0.00056514615,0.00012938668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020257717,0.00047243657,0.0070245485,0.00010331977,0.000057548084,0.0010439805,0.0003539153,0.9524104,0.0021139022,0.018246584,0.0012273312,0.016743457],"study_design_scores_gemma":[0.00002189253,0.000042456137,0.0008690241,0.000008681869,0.00002167374,0.000050414972,0.0005426544,0.99320674,0.0010779783,0.0028118116,0.0013339919,0.000012741371],"about_ca_topic_score_codex":0.023286117,"about_ca_topic_score_gemma":0.038225554,"teacher_disagreement_score":0.023286117,"about_ca_system_score_codex":0.0013969908,"about_ca_system_score_gemma":0.0011619239,"threshold_uncertainty_score":0.046301126},"labels":[],"label_agreement":null},{"id":"W4402562281","doi":"10.1016/j.epsr.2024.111057","title":"Energy management for smart residential homes: A real-time fuzzy logic approach","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Qatar National Research Fund; Qatar Foundation","keywords":"Fuzzy logic; Energy (signal processing); Computer science; Energy management; Architectural engineering; Engineering; Artificial intelligence; Mathematics; Statistics","score_opus":0.0242373860998588,"score_gpt":0.2798577246842726,"score_spread":0.2556203385844138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402562281","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024700468,0.00013049784,0.9668947,0.0002037913,0.000038005368,0.000060863676,0.000037048932,0.00027794676,0.0076567493],"genre_scores_gemma":[0.873094,0.00016218673,0.122361965,0.00009971273,0.000030337435,0.00007304064,0.000046021185,0.000020724985,0.0041119936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985635,0.00003103465,0.000008071327,0.0000311475,0.000051115403,0.000022243861],"domain_scores_gemma":[0.99988353,0.000040026865,0.000018631503,0.0000074595373,0.00004261675,0.000007673068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030671177,0.00039415213,0.00032586892,0.00027356175,0.0003626257,0.00072022935,0.00055163336,0.0004875956,0.0028491225],"category_scores_gemma":[0.00041768313,0.00012794657,0.00035715787,0.00018429891,0.00025956478,0.0004621119,0.00025020848,0.0004912005,0.00025763572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015434201,0.00016755585,0.00111958,0.0001186137,0.000038557988,0.00022648672,0.00014533506,0.846555,0.018765135,0.015954422,0.0012968814,0.1154581],"study_design_scores_gemma":[0.000008075804,0.000034008095,0.00012401892,0.0000051143,0.0000075769503,0.000017236058,0.000020702866,0.99596256,0.0012540731,0.0019560538,0.00060651544,0.0000040342475],"about_ca_topic_score_codex":0.0077617182,"about_ca_topic_score_gemma":0.008318519,"teacher_disagreement_score":0.0077617182,"about_ca_system_score_codex":0.0006697413,"about_ca_system_score_gemma":0.0007096586,"threshold_uncertainty_score":0.015433073},"labels":[],"label_agreement":null},{"id":"W4402570352","doi":"10.1109/tia.2024.3462667","title":"Data-Driven Energy and Reserve Management of Prosumers Under Multi-Uncertainties","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Hong Kong Polytechnic University","keywords":"Energy management; Computer science; Energy (signal processing); Environmental economics; Economics; Physics","score_opus":0.044995304921983316,"score_gpt":0.2756914651585082,"score_spread":0.23069616023652487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402570352","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020390054,0.00022595338,0.97659826,0.00031607758,0.000044484455,0.000041355666,0.000079447454,0.000103762206,0.0022006363],"genre_scores_gemma":[0.9591111,0.00018256443,0.038763616,0.00010414168,0.000042695945,0.000090974,0.00008384811,0.00003740761,0.0015837675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925095,0.00020777153,0.00003788549,0.00019892042,0.00019086036,0.000113656955],"domain_scores_gemma":[0.9987847,0.00067672273,0.00018926975,0.000094099,0.00018817691,0.000067081506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017781461,0.0012611931,0.001609312,0.0003560299,0.0005132182,0.0018692759,0.0018539433,0.0014597198,0.0016884129],"category_scores_gemma":[0.0034668187,0.000628162,0.0007175732,0.0005903617,0.0009552621,0.0023737,0.0019271261,0.0019291213,0.00019408931],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021870263,0.000012020475,0.00014760719,0.000026232256,0.000013315925,0.000052907497,0.000022432652,0.988696,0.00043781678,0.0063151075,0.0001646817,0.004089966],"study_design_scores_gemma":[0.0000025405936,0.000010679572,0.000023224931,0.0000021273943,0.0000025157335,0.000006654448,0.000007448742,0.99709666,0.00012288343,0.002616604,0.00010589458,0.0000028504305],"about_ca_topic_score_codex":0.003492291,"about_ca_topic_score_gemma":0.0028684144,"teacher_disagreement_score":0.003492291,"about_ca_system_score_codex":0.0008150808,"about_ca_system_score_gemma":0.0012988712,"threshold_uncertainty_score":0.009403825},"labels":[],"label_agreement":null},{"id":"W4402627328","doi":"10.1109/tie.2024.3451111","title":"A Control for Preventing False Tripping of Grid-Tied Renewable Systems With Increased Solar Penetration and Fluctuating Load Demand","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Tripping; Renewable energy; Penetration (warfare); Grid; Grid parity; Engineering; Computer science; Automotive engineering; Electrical engineering; Reliability engineering; Distributed generation; Environmental science; Operations research; Geology","score_opus":0.013838227946434684,"score_gpt":0.20732961072397976,"score_spread":0.19349138277754507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402627328","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07623975,0.00028797466,0.9169364,0.00014533427,0.0001809558,0.0001457408,0.00006261232,0.0018366107,0.0041645905],"genre_scores_gemma":[0.9589655,0.000069312264,0.038849063,0.00008314696,0.00005752856,0.00003794704,0.000028317778,0.000027530892,0.0018817567],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995592,0.000062776344,0.000038537903,0.00014037511,0.00015571991,0.000043387427],"domain_scores_gemma":[0.9992126,0.00017897619,0.00025804294,0.00011021336,0.00019834525,0.00004183538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030507336,0.00049802766,0.00027085285,0.0004459001,0.0004652809,0.00079552527,0.00074999797,0.00047057154,0.0023452488],"category_scores_gemma":[0.0009864165,0.00015554125,0.00021088407,0.0001691646,0.00030370854,0.0004459201,0.00034647863,0.00049415766,0.0004764848],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012153784,0.00044096136,0.00224715,0.0005819608,0.00010619377,0.00063694577,0.00048042793,0.051255118,0.44622612,0.0079218615,0.0033825515,0.48550534],"study_design_scores_gemma":[0.0001842655,0.0030042506,0.00513838,0.00009753972,0.00021155925,0.0013451505,0.000100198136,0.68811285,0.28664762,0.0031919826,0.011899782,0.000066403496],"about_ca_topic_score_codex":0.0006514998,"about_ca_topic_score_gemma":0.0013201004,"teacher_disagreement_score":0.0023452488,"about_ca_system_score_codex":0.00028216746,"about_ca_system_score_gemma":0.00026713085,"threshold_uncertainty_score":0.007845581},"labels":[],"label_agreement":null},{"id":"W4402690797","doi":"10.1016/j.epsr.2024.111059","title":"Modeling of heat pumps load profiles for power systems integration","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Electric power system; Heat pump; Heat load; System integration; Power (physics); Computer science; Engineering; Electrical engineering; Environmental science; Mechanical engineering; Heat exchanger; Physics; Thermodynamics","score_opus":0.03847731750826301,"score_gpt":0.30531394807926454,"score_spread":0.26683663057100154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402690797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27599347,0.00043607227,0.6836167,0.00082652515,0.000087644185,0.00030133338,0.0025457456,0.0019546153,0.034237858],"genre_scores_gemma":[0.9673016,0.00022888895,0.024702692,0.00004642522,0.000019723417,0.00013157695,0.00084446726,0.00010845026,0.006616215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973947,0.00008283681,0.000010773958,0.000052234354,0.00006835305,0.000046361754],"domain_scores_gemma":[0.9996679,0.00015024804,0.000030859002,0.000026317912,0.00010494687,0.000019764493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048259203,0.00082364347,0.00056458835,0.00035312318,0.0005883373,0.0014487422,0.0009970232,0.00090421323,0.0025409334],"category_scores_gemma":[0.0014434211,0.00053725566,0.00067416154,0.00082722935,0.0004000028,0.00086137245,0.00057362864,0.0012499968,0.00035708363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000082652705,0.000008133778,0.0006920773,0.000007914262,0.000008396919,0.000014754911,0.000021861608,0.9958556,0.00016500852,0.0011084969,0.0002560371,0.001853474],"study_design_scores_gemma":[0.0000016278955,0.000002397774,0.00028170517,0.0000015151271,0.0000017838042,0.0000018711248,0.000009332223,0.9990657,0.000061808634,0.00030660807,0.00026359424,0.0000020027371],"about_ca_topic_score_codex":0.40348113,"about_ca_topic_score_gemma":0.335989,"teacher_disagreement_score":0.40348113,"about_ca_system_score_codex":0.0032408547,"about_ca_system_score_gemma":0.002943038,"threshold_uncertainty_score":0.8022652},"labels":[],"label_agreement":null},{"id":"W4402764848","doi":"10.1115/es2024-130538","title":"Enhancing Battery Storage Energy Arbitrage With Deep Reinforcement Learning and Time-Series Forecasting","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"McGill University","keywords":"Reinforcement learning; Arbitrage; Revenue; Electricity; Computer science; Battery (electricity); Electricity price forecasting; Deep learning; Artificial intelligence; Electricity market; Econometrics; Economics; Engineering; Finance; Electrical engineering","score_opus":0.006391332218540322,"score_gpt":0.1775917264410149,"score_spread":0.17120039422247457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402764848","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6199684,0.00092049583,0.3680417,0.001055245,0.00018889987,0.000055115674,0.00014615897,0.0021167942,0.0075071603],"genre_scores_gemma":[0.9949039,0.000030143092,0.004545038,0.00004292225,0.000007756343,0.000006289838,0.000024143697,0.000009766096,0.00043017708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980634,0.000047042657,0.000010334472,0.00003528453,0.000051309424,0.00004967591],"domain_scores_gemma":[0.9992316,0.00039968968,0.00009684199,0.00006618804,0.00014462644,0.000061047256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000775911,0.00051724364,0.0005040771,0.00023228627,0.00015642846,0.00052488217,0.00057132385,0.00045967998,0.0012378326],"category_scores_gemma":[0.0025746857,0.00018334105,0.000232122,0.00022490238,0.00036535083,0.00073226955,0.0005690628,0.00089878804,0.00017253635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011163953,0.00012758697,0.0016635584,0.000026919626,0.000025202313,0.000066825385,0.00002130176,0.9630827,0.002757072,0.001674122,0.00066486985,0.029778246],"study_design_scores_gemma":[0.0000031786649,0.000009377858,0.00007589812,0.0000010185457,0.0000013666456,0.0000017782601,0.0000011990796,0.99910563,0.00037271195,0.00037622475,0.000050589726,0.0000010538164],"about_ca_topic_score_codex":0.008515231,"about_ca_topic_score_gemma":0.006276531,"teacher_disagreement_score":0.008515231,"about_ca_system_score_codex":0.00061017316,"about_ca_system_score_gemma":0.00070706295,"threshold_uncertainty_score":0.016931355},"labels":[],"label_agreement":null},{"id":"W4402980902","doi":"10.1109/otcon60325.2024.10687601","title":"Aggregative Dynamics and Revenue Structuring in Energy Internet User-Prosumer Ecosystems","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Prosumer; Structuring; The Internet; Revenue; Computer science; Ecosystem; Business; Environmental economics; World Wide Web; Ecology; Economics; Renewable energy","score_opus":0.004052710805536301,"score_gpt":0.18035187243193537,"score_spread":0.17629916162639908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402980902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8152457,0.0006635628,0.1466859,0.0016633887,0.00006103421,0.000049648814,0.00018889573,0.00016641637,0.03527544],"genre_scores_gemma":[0.9941498,0.00013859355,0.0033954892,0.00004646076,0.000011686557,0.00001611504,0.000020026708,0.000014824535,0.0022068776],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962056,0.00015629738,0.000013478784,0.00006683528,0.00005307612,0.000089768495],"domain_scores_gemma":[0.999356,0.00021546966,0.00017267006,0.00005586057,0.00008309583,0.00011693997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005962904,0.0002993859,0.00040721896,0.0006696494,0.00080859545,0.0020507905,0.0006560217,0.00076098304,0.0028202168],"category_scores_gemma":[0.0021189475,0.0002466965,0.00056474225,0.00052427116,0.00126869,0.0030923998,0.001643703,0.00055287086,0.00029832002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016081936,0.00018106496,0.024337774,0.000112875285,0.00014880027,0.0013032339,0.0014547945,0.37791738,0.0048864163,0.55963725,0.0034024864,0.02645714],"study_design_scores_gemma":[0.000015918713,0.00006249194,0.006678709,0.000025322961,0.00003086927,0.00033985695,0.0012286948,0.8137036,0.00060015527,0.17357844,0.0036868826,0.000049062557],"about_ca_topic_score_codex":0.0024738538,"about_ca_topic_score_gemma":0.0016638396,"teacher_disagreement_score":0.0028202168,"about_ca_system_score_codex":0.0010150688,"about_ca_system_score_gemma":0.0004930395,"threshold_uncertainty_score":0.009434581},"labels":[],"label_agreement":null},{"id":"W4403022224","doi":"10.1109/tnnls.2024.3432137","title":"Boosting Communication Efficiency in Federated Learning for Multiagent-Based Multimicrogrid Energy Management","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Neural Networks and Learning Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"National Natural Science Foundation of China","keywords":"Boosting (machine learning); Computer science; Efficient energy use; Artificial intelligence; Knowledge management; Engineering","score_opus":0.010144344800803073,"score_gpt":0.2133974164485712,"score_spread":0.20325307164776812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403022224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07688599,0.00034415806,0.91882074,0.00033456297,0.000049590668,0.000054081214,0.000024245577,0.00046185538,0.0030247807],"genre_scores_gemma":[0.96381134,0.00008393404,0.034861535,0.00010190976,0.000018066366,0.00006520489,0.000031384447,0.000020562333,0.0010061766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896765,0.00038293787,0.000053063362,0.00020292943,0.00021094299,0.00018247274],"domain_scores_gemma":[0.9983734,0.00076778705,0.0002328453,0.00018221069,0.00032446126,0.00011932052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023614785,0.0008068894,0.0010247325,0.0005953066,0.0009366647,0.0011787674,0.001603199,0.000991249,0.0011309071],"category_scores_gemma":[0.004576859,0.00032488932,0.0005229359,0.00051138026,0.00077969703,0.0016841649,0.0019968078,0.0009772959,0.00018270496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013187839,0.00009482299,0.0011833195,0.000041835174,0.000047077254,0.00007696662,0.00009705953,0.9421457,0.0013186199,0.0067997663,0.00074281526,0.047320098],"study_design_scores_gemma":[0.0000069600737,0.000025840187,0.00008416403,0.000002744088,0.000005565585,0.0000094837715,0.000012754217,0.99713266,0.0002759406,0.002315808,0.00012487953,0.0000031563932],"about_ca_topic_score_codex":0.0037906973,"about_ca_topic_score_gemma":0.0029729935,"teacher_disagreement_score":0.0037906973,"about_ca_system_score_codex":0.0010743702,"about_ca_system_score_gemma":0.0011858535,"threshold_uncertainty_score":0.012488842},"labels":[],"label_agreement":null},{"id":"W4403125763","doi":"10.1109/sest61601.2024.10694409","title":"Clustering Alternatives in Market-Clearing for Transactive Energy Flexibility Spot Markets","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Clearing; Cluster analysis; Flexibility (engineering); Transactive memory; Market clearing; Spot contract; Computer science; Business; Artificial intelligence; Economics; Microeconomics; Futures contract; Knowledge management; Finance","score_opus":0.014068320526054133,"score_gpt":0.23653380100452961,"score_spread":0.22246548047847547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403125763","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2994976,0.0006603431,0.6831682,0.00026727756,0.00007870005,0.0003930157,0.00013749953,0.0003655356,0.015431937],"genre_scores_gemma":[0.9254263,0.00011512105,0.07225931,0.000035664947,0.000011697115,0.00007704269,0.000100934005,0.00004089132,0.0019330323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979752,0.00095812493,0.000093004106,0.00032540446,0.0003671056,0.00028113966],"domain_scores_gemma":[0.99774843,0.0010250974,0.0002936606,0.00030013698,0.00040686797,0.00022571186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029006053,0.000637327,0.0010228641,0.0016813754,0.0014093455,0.002392993,0.0018749993,0.0011848374,0.004894364],"category_scores_gemma":[0.0045179133,0.00036901646,0.0008578672,0.0020971359,0.0012254816,0.0029578647,0.0015032258,0.0007738567,0.00054897636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071477797,0.0002469235,0.0022395833,0.00014870807,0.0001170016,0.00014600018,0.00044852492,0.81601655,0.002703458,0.07324169,0.0012741487,0.10270258],"study_design_scores_gemma":[0.000041324172,0.00016575812,0.0011390412,0.000018216211,0.000022059263,0.00006729982,0.00039006321,0.970158,0.0015043906,0.024520222,0.0019380981,0.000035416084],"about_ca_topic_score_codex":0.005120852,"about_ca_topic_score_gemma":0.009392714,"teacher_disagreement_score":0.005120852,"about_ca_system_score_codex":0.0019375224,"about_ca_system_score_gemma":0.0010395156,"threshold_uncertainty_score":0.016373336},"labels":[],"label_agreement":null},{"id":"W4403125793","doi":"10.1109/sest61601.2024.10694534","title":"A Decentralized Business Model for Integrating Energy Hubs Into Flexibility Markets Within Renewable-Based Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Smart grid; Flexibility (engineering); Renewable energy; Distributed computing; Business model; Grid; Computer science; Industrial organization; Distributed generation; Business; Environmental economics; Engineering; Electrical engineering","score_opus":0.017486019714858407,"score_gpt":0.23868357252532701,"score_spread":0.2211975528104686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403125793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0168656,0.00008015718,0.96531135,0.0005547168,0.000053922355,0.000085149746,0.00015762098,0.00017831693,0.016713053],"genre_scores_gemma":[0.81394756,0.00028522324,0.16673745,0.0001512514,0.000050906387,0.00029219157,0.0002353883,0.00006735825,0.018232595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996018,0.000165603,0.000011955218,0.00006543205,0.00010766605,0.000047608097],"domain_scores_gemma":[0.99979514,0.00007407466,0.000030901778,0.000024182742,0.000043210628,0.000032526048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067120045,0.00047489096,0.0004991267,0.00028944743,0.0005781584,0.0013647772,0.0011368217,0.0010851775,0.005170242],"category_scores_gemma":[0.00072847935,0.00035351005,0.0006404641,0.0005166937,0.0008011925,0.0015984374,0.00096049294,0.0014243441,0.00061087403],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031597247,0.000045241377,0.00025634945,0.000026419228,0.0000144473315,0.00010873895,0.000038404352,0.85390246,0.0012019671,0.13680968,0.0010263253,0.0065383795],"study_design_scores_gemma":[0.000011741145,0.000017709015,0.00004525188,0.0000033204199,0.0000036014503,0.000017424687,0.000014403218,0.98342115,0.00016011148,0.014536654,0.001764058,0.000004566531],"about_ca_topic_score_codex":0.0044160234,"about_ca_topic_score_gemma":0.005888079,"teacher_disagreement_score":0.005170242,"about_ca_system_score_codex":0.001072219,"about_ca_system_score_gemma":0.0018695873,"threshold_uncertainty_score":0.017296255},"labels":[],"label_agreement":null},{"id":"W4403127249","doi":"10.1109/pesgm51994.2024.10688845","title":"Nonparametric Probabilistic Pseudo-Measurement Model for Unbalanced Active Distribution Networks","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Nonparametric statistics; Probabilistic logic; Computer science; Statistical model; Econometrics; Artificial intelligence; Mathematics","score_opus":0.020128459745658467,"score_gpt":0.21906500819810606,"score_spread":0.1989365484524476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403127249","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0089252265,0.000098653574,0.9901507,0.00010027913,0.000020232526,0.00001567916,0.00007987222,0.000108845736,0.00050055457],"genre_scores_gemma":[0.9256663,0.00056947576,0.06759387,0.00012304272,0.000081132064,0.00020218984,0.0006945857,0.00007483572,0.0049946657],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984664,0.00053317007,0.000066262604,0.0004058276,0.00038427525,0.00014410666],"domain_scores_gemma":[0.9972102,0.0014990969,0.00043554348,0.00024430655,0.000551886,0.00005886003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002284723,0.0008305775,0.0010937231,0.00069576135,0.00035486286,0.0012167443,0.002283833,0.0011401122,0.0011871624],"category_scores_gemma":[0.006404489,0.0006948407,0.00075865886,0.0009788596,0.0011930742,0.0030220267,0.0009307518,0.0014712862,0.0003410649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054057506,0.000022753622,0.0011200447,0.0000477307,0.000030312409,0.0000702199,0.00003904585,0.95224696,0.00079317996,0.03409404,0.0004574234,0.0110242255],"study_design_scores_gemma":[0.0000018333548,0.000005815209,0.00013973349,0.0000013480486,0.000002766834,0.000011810816,0.0000023137682,0.99680555,0.00008432793,0.0027780384,0.00016199386,0.000004494794],"about_ca_topic_score_codex":0.005569331,"about_ca_topic_score_gemma":0.0038106362,"teacher_disagreement_score":0.005569331,"about_ca_system_score_codex":0.000983999,"about_ca_system_score_gemma":0.00076528604,"threshold_uncertainty_score":0.012082875},"labels":[],"label_agreement":null},{"id":"W4403127377","doi":"10.1109/pesgm51994.2024.10688897","title":"Incorporating System Frequency Dynamics into Real-time Locational Marginal Pricing of Electricity","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Electricity pricing; Econometrics; Computer science; Dynamics (music); Electricity market; Economics; Engineering; Electrical engineering; Physics","score_opus":0.003593044537090628,"score_gpt":0.1861308595665229,"score_spread":0.18253781502943225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403127377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012169837,0.00006318082,0.98419535,0.00013385448,0.000063093095,0.000017697874,0.000035317775,0.00007721677,0.0032445334],"genre_scores_gemma":[0.87548393,0.00023171864,0.12001631,0.00008355581,0.000106424246,0.00006086205,0.000058561676,0.00010311323,0.0038554587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997274,0.00010848843,0.000010408876,0.000047320384,0.00007587441,0.000030417845],"domain_scores_gemma":[0.99950385,0.00025647905,0.00007206642,0.00008388129,0.000057797097,0.000025889387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059966784,0.0006347885,0.00043693418,0.0002554118,0.00024221274,0.0009103241,0.0009459308,0.0006164722,0.0026767869],"category_scores_gemma":[0.0028240008,0.0004294215,0.0005873008,0.00032209393,0.00067323766,0.001661435,0.000851482,0.0011043125,0.00025921484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001167307,0.000014464746,0.00031544248,0.00001790394,0.000013569347,0.000049989805,0.000023117816,0.961695,0.0008193778,0.028390856,0.00030900573,0.008339619],"study_design_scores_gemma":[0.0000018100193,0.000007761633,0.000057821137,0.0000018530523,0.0000025577488,0.000010365286,0.000004737737,0.99320704,0.0001332957,0.0060690567,0.0005006657,0.0000029607088],"about_ca_topic_score_codex":0.003626584,"about_ca_topic_score_gemma":0.004130375,"teacher_disagreement_score":0.003626584,"about_ca_system_score_codex":0.0006468262,"about_ca_system_score_gemma":0.00089310907,"threshold_uncertainty_score":0.008954763},"labels":[],"label_agreement":null},{"id":"W4403284936","doi":"10.1016/j.egyr.2024.09.042","title":"PPO-MixClip : An energy scheduling algorithm for low-carbon parks","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"National Natural Science Foundation of China","keywords":"Scheduling (production processes); Computer science; Carbon fibers; Energy (signal processing); Algorithm; Environmental science; Mathematical optimization; Mathematics","score_opus":0.006648515633622266,"score_gpt":0.210545506313022,"score_spread":0.20389699067939973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403284936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023888428,0.00016866773,0.9709062,0.00017601151,0.000058328158,0.00009061048,0.000053728985,0.000625238,0.004032796],"genre_scores_gemma":[0.65481657,0.00016802401,0.33991674,0.00018042064,0.000059146343,0.0002610769,0.00018982757,0.00015059693,0.0042575276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998317,0.000037322086,0.000007276707,0.00003774136,0.00004830067,0.000037717327],"domain_scores_gemma":[0.9997695,0.00009036652,0.000030833045,0.000015944326,0.000056440334,0.00003687808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048193356,0.00057252945,0.0007011446,0.0003548889,0.00039218532,0.00060091284,0.0011074577,0.0007544046,0.0021450846],"category_scores_gemma":[0.0009418219,0.00033639735,0.00027410008,0.00048204308,0.00034604507,0.0005499709,0.00091734406,0.0007274963,0.00040782226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017100807,0.0000783112,0.00066975295,0.00007732448,0.000024584908,0.000069729846,0.000045424647,0.8957147,0.002094123,0.0055833748,0.002983004,0.09248876],"study_design_scores_gemma":[0.000012947951,0.000023940604,0.00004831322,0.0000022949566,0.0000022558802,0.000008777438,0.000005651812,0.9981363,0.00035949796,0.00091933575,0.0004782099,0.0000024215035],"about_ca_topic_score_codex":0.0030548382,"about_ca_topic_score_gemma":0.0029881515,"teacher_disagreement_score":0.0030548382,"about_ca_system_score_codex":0.00047516034,"about_ca_system_score_gemma":0.0014093999,"threshold_uncertainty_score":0.0071760416},"labels":[],"label_agreement":null},{"id":"W4403286368","doi":"10.1016/j.apm.2024.115756","title":"Optimal scheduling of battery energy storage system operations under load uncertainty","year":2024,"lang":"en","type":"article","venue":"Applied Mathematical Modelling","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"Toronto Metropolitan University","keywords":"Energy storage; Computer science; Scheduling (production processes); Battery storage; Reliability engineering; Battery (electricity); Automotive engineering; Operations research; Mathematical optimization; Engineering; Operations management; Mathematics","score_opus":0.01673362627658421,"score_gpt":0.2084374618163108,"score_spread":0.19170383553972659,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403286368","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5460596,0.0006598653,0.42866462,0.0011294014,0.00027783192,0.00019564776,0.00057910697,0.00049530267,0.021938585],"genre_scores_gemma":[0.9955621,0.000048149293,0.0036148224,0.000012337891,0.0000132792475,0.0000143467505,0.000033907938,0.000014800303,0.000686364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999726,0.00009674144,0.000013592257,0.000040982595,0.000056280987,0.00006643763],"domain_scores_gemma":[0.9991683,0.0005147837,0.00011440125,0.00003357593,0.00010571641,0.00006329838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067958084,0.0004849614,0.0008214246,0.00035920425,0.00037974384,0.0011796982,0.00049359654,0.00053193816,0.001978256],"category_scores_gemma":[0.0023849313,0.00043755336,0.00022864158,0.0005212483,0.00047884925,0.00086712575,0.00039620887,0.0006368209,0.0001965809],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001322403,0.00002375478,0.00014518439,0.000022106655,0.000008926225,0.000027693126,0.000019463116,0.99110705,0.00083548,0.0031963238,0.00036041965,0.0041214162],"study_design_scores_gemma":[0.000007638956,0.000014468431,0.00010540619,0.0000014337728,0.0000022245285,0.0000028210497,0.000008348425,0.998103,0.00024087942,0.001432715,0.00007869407,0.0000022463032],"about_ca_topic_score_codex":0.008968138,"about_ca_topic_score_gemma":0.008326741,"teacher_disagreement_score":0.008968138,"about_ca_system_score_codex":0.0010839661,"about_ca_system_score_gemma":0.0013550906,"threshold_uncertainty_score":0.017831862},"labels":[],"label_agreement":null},{"id":"W4403484665","doi":"10.2139/ssrn.4990858","title":"Projecting and Estimating Hvac Energy Savings from Correcting Control Faults: Comparison between Physical and Virtual Metering Approaches","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Metering mode; HVAC; Control (management); Computer science; Reliability engineering; Energy (signal processing); Automotive engineering; Control engineering; Engineering; Statistics; Mechanical engineering; Air conditioning; Mathematics; Artificial intelligence","score_opus":0.018360544961807748,"score_gpt":0.23340375868933994,"score_spread":0.21504321372753218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403484665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56827664,0.0009562298,0.42398372,0.00026031892,0.00013789465,0.000042757714,0.00032717048,0.0011613207,0.004853857],"genre_scores_gemma":[0.9690966,0.00015843927,0.030191194,0.000012823066,0.000016161606,0.0000058822716,0.00010553304,0.000021656237,0.0003916628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995833,0.00016288555,0.000021138734,0.00008759105,0.00010363919,0.000041497427],"domain_scores_gemma":[0.9981919,0.0012067159,0.00013927788,0.00021200572,0.00020700476,0.000043090928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010101612,0.00064922904,0.00056050025,0.0005193172,0.00020127362,0.001404193,0.0005659053,0.00064027397,0.001448132],"category_scores_gemma":[0.004406932,0.00031865417,0.0003992656,0.0007028372,0.0003674056,0.0013787643,0.0006823409,0.0006236656,0.00018627211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083370705,0.00008759304,0.008407389,0.00015485536,0.0001383568,0.000055149805,0.00007580235,0.79696757,0.0035671152,0.0023698336,0.0003655611,0.18697698],"study_design_scores_gemma":[0.00002188851,0.00015227727,0.004709091,0.000016339107,0.000047212092,0.00005418869,0.000059916183,0.9886163,0.0038831616,0.0021294716,0.00029425364,0.000015826321],"about_ca_topic_score_codex":0.004529984,"about_ca_topic_score_gemma":0.002949163,"teacher_disagreement_score":0.004529984,"about_ca_system_score_codex":0.00029522102,"about_ca_system_score_gemma":0.0007399135,"threshold_uncertainty_score":0.0090072155},"labels":[],"label_agreement":null},{"id":"W4403606092","doi":"10.3390/info15100638","title":"Voltage Deviation Improvement in Microgrid Operation through Demand Response Using Imperialist Competitive and Genetic Algorithms","year":2024,"lang":"en","type":"article","venue":"Information","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Mitacs","keywords":"Microgrid; Voltage; Demand response; Genetic algorithm; Computer science; Algorithm; Imperialist competitive algorithm; Mathematical optimization; Control theory (sociology); Engineering; Mathematics; Machine learning; Artificial intelligence; Electrical engineering; Electricity; Control (management); Meta-optimization","score_opus":0.0077323876643767275,"score_gpt":0.22319939989326348,"score_spread":0.21546701222888676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403606092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20586129,0.0010024642,0.7694108,0.00045234014,0.000096503325,0.00010241696,0.00005241718,0.0005489835,0.02247289],"genre_scores_gemma":[0.9718259,0.00016615429,0.026771044,0.00004448782,0.000015550117,0.000040079438,0.000026292182,0.000021601429,0.0010889325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972826,0.00008472518,0.000013990064,0.00004501836,0.00009384592,0.000034298402],"domain_scores_gemma":[0.9996655,0.00014986073,0.000055011882,0.000022658149,0.000088243294,0.00001868956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058129965,0.0006227725,0.0006686125,0.0004588978,0.00032788675,0.0008858737,0.0006627508,0.0005914484,0.00079288124],"category_scores_gemma":[0.0015597155,0.00021358002,0.00039570476,0.0004905066,0.00042718815,0.00050299143,0.00052401435,0.0004421108,0.000115989336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051951625,0.00004514686,0.00047397843,0.00003888849,0.000032467895,0.00003894958,0.00006540656,0.9541354,0.0017077801,0.004633517,0.00051028706,0.03826619],"study_design_scores_gemma":[0.000005710495,0.000025899157,0.000076086435,0.0000022460658,0.000004833879,0.000010171169,0.0000069364523,0.99862885,0.000316902,0.000670167,0.00024968942,0.0000025839465],"about_ca_topic_score_codex":0.00458832,"about_ca_topic_score_gemma":0.0031203346,"teacher_disagreement_score":0.00458832,"about_ca_system_score_codex":0.00056816445,"about_ca_system_score_gemma":0.0006226111,"threshold_uncertainty_score":0.009123206},"labels":[],"label_agreement":null},{"id":"W4403724369","doi":"10.1109/temsconlatam61834.2024.10717753","title":"Evaluating the Impact of V2G on Frequency Regulation in the Colombian Electricity Grid","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electricity; Grid; Vehicle-to-grid; Electrical engineering; Computer science; Environmental economics; Telecommunications; Engineering; Economics; Physics; Geography; Power (physics)","score_opus":0.033709462559921716,"score_gpt":0.324116986475302,"score_spread":0.2904075239153803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403724369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9478138,0.00081572257,0.012504126,0.00061754364,0.00005567893,0.00014237665,0.00086588773,0.00010212727,0.037082765],"genre_scores_gemma":[0.99834096,0.00013437141,0.0008955143,0.000012710043,0.0000031870125,0.000012939026,0.00012169897,0.000007310954,0.00047131974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926466,0.00034820908,0.000024955918,0.00007670604,0.00016614058,0.00011940711],"domain_scores_gemma":[0.9984226,0.00093097513,0.00018371014,0.000078323734,0.00031712253,0.000067278495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007023585,0.00051488495,0.0003072204,0.0004511446,0.00037471004,0.001413278,0.00048661247,0.0005386701,0.0019407211],"category_scores_gemma":[0.0037388445,0.00014292708,0.00026396714,0.00054417097,0.00045922227,0.0008744185,0.00061619113,0.00047240817,0.000112723945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004415172,0.00013836058,0.05599025,0.00043450794,0.0001103554,0.00068155123,0.00022475923,0.89128524,0.004071095,0.012958875,0.0020642383,0.031599313],"study_design_scores_gemma":[0.00014158819,0.0006749971,0.12157547,0.000120683646,0.00016769173,0.00015529389,0.0024533062,0.8551261,0.0047694207,0.004081576,0.010626956,0.00010709267],"about_ca_topic_score_codex":0.16184078,"about_ca_topic_score_gemma":0.15569977,"teacher_disagreement_score":0.16184078,"about_ca_system_score_codex":0.0033224565,"about_ca_system_score_gemma":0.001504629,"threshold_uncertainty_score":0.32179755},"labels":[],"label_agreement":null},{"id":"W4403846111","doi":"10.18280/jesa.570506","title":"Enhancing Grid Stability and Efficiency: Cost-Effective Hardware Implementation for Advanced Control of Grid-Connected PV Systems","year":2024,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Grid; Computer science; Control (management); Stability (learning theory); Photovoltaic system; Embedded system; Computer hardware; Engineering; Electrical engineering; Artificial intelligence; Mathematics","score_opus":0.011200632003909623,"score_gpt":0.2569539760061959,"score_spread":0.2457533440022863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403846111","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35087052,0.00071732624,0.624376,0.0005833721,0.00014882005,0.0002262333,0.0001587027,0.003652763,0.019266328],"genre_scores_gemma":[0.97210497,0.000060004208,0.026088154,0.000024752633,0.000014883929,0.00002038929,0.00003566113,0.000033973873,0.001617196],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99963033,0.0000936967,0.00001907671,0.000039026574,0.00016928848,0.000048507507],"domain_scores_gemma":[0.9995433,0.00014456121,0.000052371986,0.000095264986,0.00014686855,0.000017532451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026055085,0.00041268655,0.00033310312,0.00040129182,0.0002710143,0.000731602,0.0008167381,0.00035879065,0.005109175],"category_scores_gemma":[0.0008934797,0.00018799289,0.00019307945,0.0002889269,0.00016922267,0.00086701795,0.00037618988,0.0004063925,0.000551055],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010229846,0.0005487367,0.0027830447,0.0003230008,0.000068181835,0.00017523029,0.00008495925,0.20334375,0.113289855,0.007838893,0.003552694,0.6669687],"study_design_scores_gemma":[0.00020834728,0.00094567024,0.0053262357,0.000034094603,0.000080743914,0.00015358155,0.000051284427,0.8943439,0.08902091,0.0029744224,0.006830539,0.000030153271],"about_ca_topic_score_codex":0.0017638139,"about_ca_topic_score_gemma":0.0035025764,"teacher_disagreement_score":0.005109175,"about_ca_system_score_codex":0.00032402814,"about_ca_system_score_gemma":0.00048176383,"threshold_uncertainty_score":0.01709187},"labels":[],"label_agreement":null},{"id":"W4404035338","doi":"10.2139/ssrn.5009204","title":"Energy Scheduling and Economic Assessment of a Rural Microgrid Using Two-Stage Stochastic Framework","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Scheduling (production processes); Stage (stratigraphy); Environmental economics; Computer science; Energy (signal processing); Operations research; Economics; Business; Natural resource economics; Operations management; Engineering; Mathematics; Statistics; Control (management); Artificial intelligence","score_opus":0.008031881957715505,"score_gpt":0.2601657338807396,"score_spread":0.2521338519230241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404035338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69527775,0.0005427802,0.28533342,0.0011441575,0.0000910145,0.00020022782,0.0010685984,0.00025496684,0.016087139],"genre_scores_gemma":[0.9905517,0.0001257031,0.0047652945,0.000028489601,0.000022118005,0.000044818935,0.000121700454,0.000024007517,0.004316184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939084,0.0003110957,0.000014601433,0.00009449046,0.00005613007,0.00013284104],"domain_scores_gemma":[0.9988674,0.00069046306,0.00015331345,0.000037845602,0.00013980504,0.00011118329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014492928,0.0010045536,0.0016859238,0.00053421606,0.00048785246,0.0014939245,0.0014028983,0.0016877725,0.0038402008],"category_scores_gemma":[0.002183057,0.0008274099,0.0010449826,0.0008552978,0.0008525151,0.0010837659,0.0010334792,0.0009974104,0.00022493393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005892811,0.00001573575,0.00017990588,0.000011079236,0.000008779756,0.000039329978,0.000004690282,0.9974101,0.00018125208,0.0016272491,0.000070275935,0.00039270648],"study_design_scores_gemma":[0.000009439616,0.000023782624,0.00012560555,8.855331e-7,0.000005152721,0.0000041690173,0.000007525998,0.99914277,0.00003794028,0.0006037792,0.00003579318,0.0000031763404],"about_ca_topic_score_codex":0.022052744,"about_ca_topic_score_gemma":0.012916982,"teacher_disagreement_score":0.022052744,"about_ca_system_score_codex":0.0014476369,"about_ca_system_score_gemma":0.0014220353,"threshold_uncertainty_score":0.043848753},"labels":[],"label_agreement":null},{"id":"W4404102331","doi":"10.1109/sege62220.2024.10739525","title":"Improving Decision-Making in Distribution Networks Using Data Analysis","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Barrie Urology Group","funders":"","keywords":"Computer science; Data science","score_opus":0.01609588387621954,"score_gpt":0.2635986485801395,"score_spread":0.24750276470391994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404102331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.099712335,0.0038266457,0.85134804,0.020569796,0.00039079846,0.0009677356,0.0017579821,0.0016780796,0.019748576],"genre_scores_gemma":[0.6898683,0.0027158034,0.30397227,0.00083357707,0.00019980584,0.0002753492,0.0011658581,0.000091003734,0.0008779735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9878997,0.007731761,0.0008344211,0.0013069713,0.0017510738,0.0004760972],"domain_scores_gemma":[0.957983,0.03375216,0.0024473132,0.0029675453,0.002170614,0.00067935203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015124718,0.0015936405,0.001339926,0.003734233,0.001670899,0.009665244,0.00203125,0.0018743201,0.0016746002],"category_scores_gemma":[0.043691363,0.0007611049,0.0011225326,0.0040108496,0.0022981185,0.009561851,0.0030007332,0.0032302807,0.0005813628],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005888767,0.0007160361,0.026521083,0.0012961238,0.000494654,0.00075660157,0.0023028746,0.50945526,0.003656217,0.08766066,0.0095031485,0.35704848],"study_design_scores_gemma":[0.00007401888,0.0001565798,0.0028392498,0.00058894395,0.00008827788,0.00011507765,0.0037615078,0.7428245,0.0046012127,0.22663029,0.018203517,0.000116755065],"about_ca_topic_score_codex":0.007814609,"about_ca_topic_score_gemma":0.0075022504,"teacher_disagreement_score":0.015124718,"about_ca_system_score_codex":0.002932076,"about_ca_system_score_gemma":0.004833819,"threshold_uncertainty_score":0.07998812},"labels":[],"label_agreement":null},{"id":"W4404102626","doi":"10.1109/sege62220.2024.10739597","title":"Optimal Smart Inverter Volt-Watt and Volt-Var Settings to Maximize Fair Contribution in Voltage Regulation","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Volt; Watt; Inverter; Voltage; Electrical engineering; Computer science; Engineering; Power (physics); Physics","score_opus":0.004466811477948585,"score_gpt":0.1894228483706331,"score_spread":0.18495603689268453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404102626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.103327006,0.00042715415,0.86385053,0.0003083776,0.00006638997,0.00021351385,0.00009320082,0.0005998615,0.03111392],"genre_scores_gemma":[0.97222656,0.00010541246,0.02624604,0.000046227477,0.00001638815,0.00006115753,0.00002349263,0.00004846502,0.0012262668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999553,0.00011670798,0.000016043256,0.00008703235,0.00015947205,0.00006770631],"domain_scores_gemma":[0.99959177,0.00014894156,0.00009318178,0.000034245284,0.000103556384,0.000028380431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060046226,0.00073050964,0.0009641245,0.00053565647,0.00034662287,0.0013231843,0.0006460284,0.00077570026,0.0018909969],"category_scores_gemma":[0.0019906235,0.00034343128,0.00034504884,0.0005803273,0.0005054339,0.00071833807,0.00048598181,0.0006817988,0.00041737806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009117284,0.00011372351,0.0005741582,0.000070239716,0.00003406689,0.000056829416,0.00007280922,0.9357962,0.010137318,0.007310335,0.0011386594,0.044604417],"study_design_scores_gemma":[0.000028927305,0.00013336696,0.00050248083,0.000011821422,0.000018496337,0.00004145483,0.000028877414,0.9910671,0.003381016,0.0040940195,0.00068147946,0.000011003823],"about_ca_topic_score_codex":0.0014089422,"about_ca_topic_score_gemma":0.0027123776,"teacher_disagreement_score":0.0018909969,"about_ca_system_score_codex":0.00077800517,"about_ca_system_score_gemma":0.00079542823,"threshold_uncertainty_score":0.00632596},"labels":[],"label_agreement":null},{"id":"W4404103003","doi":"10.1109/sege62220.2024.10739592","title":"Preface","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Computer science","score_opus":0.0033390749935251172,"score_gpt":0.1673486147064073,"score_spread":0.16400953971288218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103003","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016107293,0.01710212,0.010181384,0.10297478,0.2924574,0.00072538445,0.01051312,0.0027683459,0.5616666],"genre_scores_gemma":[0.009641465,0.013619375,0.0050959173,0.02389015,0.078055345,0.00058775995,0.010702057,0.0016191425,0.85678875],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865925,0.0001940106,0.000093564806,0.00024023803,0.0006958157,0.00011710221],"domain_scores_gemma":[0.9906303,0.0015150238,0.00041228946,0.0005913915,0.0055733076,0.0012777676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021153963,0.0010574869,0.00081453926,0.0026734434,0.0024613042,0.0049959538,0.0016534439,0.0018454415,0.3571221],"category_scores_gemma":[0.019223453,0.00036900837,0.0006506004,0.0020192475,0.00088729797,0.0040180543,0.0023515397,0.0050904667,0.30273125],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016631333,0.000014490799,0.00008242208,0.00006747352,0.0000011923756,0.00003228443,0.000078825586,0.00004866118,0.00008341702,0.0029678359,0.9710724,0.02553432],"study_design_scores_gemma":[0.0000031053648,0.00001848053,0.00022447841,0.00014419902,0.00000133445,0.00007567117,0.00008440489,0.000027806318,0.00004946189,0.0020115103,0.9973538,0.000005787936],"about_ca_topic_score_codex":0.003280087,"about_ca_topic_score_gemma":0.0029731197,"teacher_disagreement_score":0.3571221,"about_ca_system_score_codex":0.0022066685,"about_ca_system_score_gemma":0.002117731,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4404103012","doi":"10.1109/sege62220.2024.10739547","title":"Improvement of Microgrids Operation Considering Demand Response Using Imperialist Competitive Algorithm","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Demand response; Imperialist competitive algorithm; Algorithm; Algorithm design; Mathematical optimization; Engineering; Mathematics; Electrical engineering; Electricity; Metaheuristic","score_opus":0.009762401596526915,"score_gpt":0.22985677221748166,"score_spread":0.22009437062095474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15699239,0.0011743038,0.81341934,0.00049952883,0.00013123258,0.00023062849,0.000101905825,0.00096203963,0.026488632],"genre_scores_gemma":[0.94444674,0.00025994744,0.05251171,0.000057145204,0.000027903918,0.00010352339,0.00008240516,0.000047941525,0.002462612],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995345,0.00014912304,0.000024511653,0.00007712452,0.00012850993,0.00008619557],"domain_scores_gemma":[0.999519,0.00021838745,0.00005835871,0.000023727749,0.00014516349,0.000035398978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000839924,0.0009830592,0.0013551384,0.00063130236,0.000680294,0.0013603417,0.0011134403,0.00100848,0.0022851056],"category_scores_gemma":[0.0018438472,0.00033038668,0.00064644293,0.00061885227,0.0004397308,0.0008210107,0.00077228906,0.0006020708,0.00027457008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061006103,0.000058959147,0.00045817983,0.00007996847,0.000033628046,0.00008240833,0.00007170488,0.9686196,0.0010469407,0.0025448233,0.0007742761,0.02616853],"study_design_scores_gemma":[0.0000065894083,0.000024589508,0.00006125663,0.00000261819,0.000005283082,0.00001209171,0.000012319749,0.99910116,0.00016272409,0.00037064383,0.00023807175,0.000002636521],"about_ca_topic_score_codex":0.012425424,"about_ca_topic_score_gemma":0.0070872186,"teacher_disagreement_score":0.012425424,"about_ca_system_score_codex":0.0008699027,"about_ca_system_score_gemma":0.0014373439,"threshold_uncertainty_score":0.024706185},"labels":[],"label_agreement":null},{"id":"W4404103279","doi":"10.1109/sege62220.2024.10739555","title":"Quadratic-Equation Based Volt-Watt Control Rules Design Strategy to Mitigate Overvoltage in Power Grids with High Penetration of Solar Sources","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Overvoltage; Penetration (warfare); Watt; Volt; Electrical engineering; Quadratic equation; Control theory (sociology); Power (physics); Power control; Engineering; Computer science; Control (management); Voltage; Physics; Mathematics; Operations research","score_opus":0.01062574601700831,"score_gpt":0.1922310961048787,"score_spread":0.1816053500878704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013952442,0.000094956384,0.980861,0.000078679426,0.00004477289,0.00008788875,0.000016047701,0.00034313003,0.0045211236],"genre_scores_gemma":[0.9234932,0.00009924069,0.07230418,0.00009864547,0.000044451084,0.00013678272,0.000050304727,0.00006090867,0.0037123028],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921465,0.00015091358,0.000045104145,0.00019692698,0.00031954923,0.0000727759],"domain_scores_gemma":[0.9989046,0.00030913923,0.00016455694,0.00008732738,0.00050300045,0.00003139639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009239726,0.00060963695,0.0005680743,0.00034277837,0.00042664097,0.0011754849,0.0009554893,0.0005662682,0.0023871867],"category_scores_gemma":[0.0019502373,0.00028727175,0.0004378181,0.00028660285,0.00042252077,0.00062551926,0.0005426208,0.000987712,0.00046427475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025112779,0.00026722587,0.00083468837,0.00025383563,0.00007192057,0.0002218303,0.0003090364,0.77178514,0.04607201,0.017643886,0.0020805164,0.16020882],"study_design_scores_gemma":[0.000024479563,0.00017799693,0.00018984971,0.000007347476,0.000015537707,0.000037018,0.000012091641,0.9927651,0.004127282,0.0015404851,0.0010942328,0.000008501061],"about_ca_topic_score_codex":0.0022975334,"about_ca_topic_score_gemma":0.0027940248,"teacher_disagreement_score":0.0023871867,"about_ca_system_score_codex":0.0004989528,"about_ca_system_score_gemma":0.00062234525,"threshold_uncertainty_score":0.0079859495},"labels":[],"label_agreement":null},{"id":"W4404178434","doi":"10.1109/access.2024.3493012","title":"Balancing Power Grids and Maximizing Revenue: A Novel Approach to Rebate Auctions for Cloud Workload Migrations","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Timeline; Maximization; Computer science; Common value auction; Grid; Revenue; Mathematical optimization; Power grid; Power (physics); Operations research; Microeconomics; Business; Economics; Finance; Mathematics","score_opus":0.024312762740357843,"score_gpt":0.26209103365603764,"score_spread":0.2377782709156798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404178434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012087631,0.00041175954,0.9821301,0.0002927957,0.00009131342,0.00013294161,0.000036993526,0.0003693603,0.0044471086],"genre_scores_gemma":[0.7983076,0.0003650934,0.19527458,0.00021582912,0.00016585052,0.00016589087,0.000080239704,0.00020325238,0.005221773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978423,0.00084870064,0.000090113914,0.0003623551,0.00054098055,0.00031543715],"domain_scores_gemma":[0.9980724,0.00075339666,0.00029838333,0.00029316513,0.00040525678,0.00017743961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030529392,0.0010967071,0.0016767692,0.00064915075,0.00056099566,0.0025848106,0.0029159414,0.0010725136,0.0029393057],"category_scores_gemma":[0.0061851186,0.00059694547,0.0007051713,0.0010623478,0.0008545854,0.0023885656,0.0016020478,0.001814177,0.0005871492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023753346,0.000265237,0.00096611655,0.0001774558,0.00008558955,0.0002888033,0.00015896208,0.79786164,0.005849372,0.061380275,0.0044979504,0.12823099],"study_design_scores_gemma":[0.000014176295,0.000046817906,0.00009783099,0.0000085420115,0.000007366337,0.00008261941,0.000017197413,0.9861665,0.00054773065,0.011587621,0.0014116686,0.0000118557455],"about_ca_topic_score_codex":0.001801761,"about_ca_topic_score_gemma":0.0019478153,"teacher_disagreement_score":0.0030529392,"about_ca_system_score_codex":0.0012667852,"about_ca_system_score_gemma":0.0016619666,"threshold_uncertainty_score":0.016145647},"labels":[],"label_agreement":null},{"id":"W4404205163","doi":"10.1016/j.segan.2024.101560","title":"Cooperative price-based demand response program for multiple aggregators based on multi-agent reinforcement learning and Shapley-value","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Shapley value; Reinforcement learning; Reinforcement; On demand; Demand response; Microeconomics; Value (mathematics); Computer science; Economics; Game theory; Artificial intelligence; Engineering; Machine learning","score_opus":0.005931316356659513,"score_gpt":0.22498558376003783,"score_spread":0.2190542674033783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404205163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06167962,0.000078353216,0.9339081,0.00018399116,0.000033952303,0.00012616026,0.000019167781,0.00033946912,0.0036311673],"genre_scores_gemma":[0.9534297,0.000036928253,0.04438967,0.000063492174,0.000016334543,0.00010580026,0.000021669906,0.00002060271,0.00191583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992925,0.00024544602,0.000028232229,0.00015543669,0.0001708762,0.000107544496],"domain_scores_gemma":[0.9989059,0.0004605047,0.0001724638,0.00009814871,0.00022868036,0.00013443003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013621333,0.00061779004,0.00081771775,0.0003367643,0.00040990513,0.00074288016,0.0014658706,0.0007265308,0.0019650757],"category_scores_gemma":[0.0020190869,0.00027714806,0.00053191715,0.00031194923,0.00069209177,0.0008299834,0.00101963,0.0009669924,0.00020170952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012230719,0.00025557337,0.0008656504,0.000057996676,0.00007135033,0.00016083108,0.00011419914,0.933576,0.0045493864,0.014743961,0.0008222541,0.044660524],"study_design_scores_gemma":[0.000012211554,0.000042078445,0.00004799006,0.000001370531,0.000004846237,0.000012792876,0.0000043866903,0.9977296,0.00036345274,0.0016200771,0.000157778,0.00000346566],"about_ca_topic_score_codex":0.0024229323,"about_ca_topic_score_gemma":0.0019644697,"teacher_disagreement_score":0.0024229323,"about_ca_system_score_codex":0.00089490466,"about_ca_system_score_gemma":0.0010551312,"threshold_uncertainty_score":0.007203698},"labels":[],"label_agreement":null},{"id":"W4404281911","doi":"10.1016/j.solener.2024.113074","title":"Streamlining structural engineering compliance of rooftop solar photovoltaic installations using an open-source approach","year":2024,"lang":"en","type":"article","venue":"Solar Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Photovoltaic system; Environmental science; Engineering physics; Engineering; Electrical engineering","score_opus":0.03702924565284634,"score_gpt":0.2539248908955193,"score_spread":0.21689564524267294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404281911","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19709612,0.00023935635,0.7266895,0.0014017107,0.0002979446,0.0016109515,0.0013495593,0.017844595,0.053470176],"genre_scores_gemma":[0.40738472,0.00026589842,0.569202,0.00022955227,0.000086008906,0.0007003687,0.0024094402,0.0033392257,0.016382856],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948591,0.0010077179,0.00031322558,0.00055946625,0.0029713353,0.00028920628],"domain_scores_gemma":[0.96458554,0.009234999,0.00449016,0.005567551,0.015464535,0.0006572163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053821523,0.0007666058,0.00042069794,0.0040532406,0.00088247686,0.0019003024,0.001725069,0.00088850566,0.009891579],"category_scores_gemma":[0.024952136,0.0006255094,0.0007838244,0.0019720157,0.0007014681,0.002384288,0.0023048325,0.0013946985,0.0028457795],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017555855,0.0012743588,0.024257127,0.0006892753,0.00008477232,0.00032899654,0.0012844034,0.059741445,0.028468803,0.010392408,0.020891244,0.85241157],"study_design_scores_gemma":[0.0004204703,0.0010994737,0.12564161,0.00071538734,0.00017502888,0.0005906583,0.0031989447,0.5579969,0.09613711,0.020371735,0.19329064,0.00036191678],"about_ca_topic_score_codex":0.008641992,"about_ca_topic_score_gemma":0.017204333,"teacher_disagreement_score":0.009891579,"about_ca_system_score_codex":0.0020070835,"about_ca_system_score_gemma":0.004985538,"threshold_uncertainty_score":0.03309059},"labels":[],"label_agreement":null},{"id":"W4404510387","doi":"10.2316/j.2024.203-0541","title":"DESIGN OF GRID SYNCHRONISATION METHOD UNDER HARMONIC POLLUTION CONDITIONS, 1-10.","year":2024,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Grid; Pollution; Harmonic; Computer science; Environmental science; Mathematics; Acoustics; Physics; Geometry","score_opus":0.01351838080489186,"score_gpt":0.2578980017669428,"score_spread":0.2443796209620509,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404510387","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013222941,0.0004198999,0.97705907,0.00007353105,0.00014960459,0.00013621536,0.000043280794,0.0007790944,0.008116341],"genre_scores_gemma":[0.718008,0.00061192975,0.2727962,0.00010616113,0.00014683709,0.0003616592,0.00019522391,0.00012308649,0.0076508736],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976546,0.000049310864,0.000012190916,0.00007473285,0.00007906728,0.0000193449],"domain_scores_gemma":[0.99983776,0.000027961598,0.00003187345,0.000020985814,0.00007102666,0.000010371161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025490456,0.00041297503,0.00031711187,0.0004237728,0.00043533728,0.00054228783,0.00064231904,0.0003995529,0.0052097877],"category_scores_gemma":[0.00054942706,0.00015126794,0.0002041716,0.0003471553,0.00017841908,0.0004225143,0.00027232463,0.0002360093,0.001506764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005449056,0.00013419692,0.002073612,0.0007242817,0.0000693036,0.0003185762,0.00036635113,0.070341,0.19800611,0.020553827,0.008758391,0.69810945],"study_design_scores_gemma":[0.00025684087,0.0009181305,0.0028034467,0.00011737934,0.00011641037,0.0010533448,0.00015813868,0.8545959,0.08895414,0.0086372215,0.04233148,0.00005755366],"about_ca_topic_score_codex":0.0005774056,"about_ca_topic_score_gemma":0.0006831305,"teacher_disagreement_score":0.0052097877,"about_ca_system_score_codex":0.00023796789,"about_ca_system_score_gemma":0.000366385,"threshold_uncertainty_score":0.017428458},"labels":[],"label_agreement":null},{"id":"W4404510399","doi":"10.2316/j.2024.203-0537","title":"STATE ESTIMATION AND ENERGY MANAGEMENT OF MICROGRID ENERGY STORAGE SYSTEM USING PARTICLE FILTER AND MARKOV CHAIN MONTE CARLO, 1-14.","year":2024,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle filter; Microgrid; Markov chain Monte Carlo; Monte Carlo method; Markov chain; Energy management system; Particle (ecology); Energy storage; Energy (signal processing); Markov process; Estimation; State (computer science); Computer science; Filter (signal processing); Energy management; Statistical physics; Engineering; Mathematics; Physics; Statistics; Algorithm; Thermodynamics; Control (management); Power (physics); Artificial intelligence","score_opus":0.006842338584987204,"score_gpt":0.20683394402180055,"score_spread":0.19999160543681335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404510399","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024892632,0.0008490872,0.9693142,0.00024164093,0.00009574265,0.00008477808,0.0002104129,0.0009195823,0.003391953],"genre_scores_gemma":[0.9126565,0.00103122,0.08142765,0.0000934016,0.00007931821,0.00014689511,0.0005376437,0.00007084413,0.0039566215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998209,0.000036023797,0.00001434734,0.00004667738,0.00005620694,0.000025851923],"domain_scores_gemma":[0.99969983,0.00012379115,0.000048209902,0.000020868429,0.00009154043,0.000015711224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048213935,0.00068749563,0.000793283,0.0003845275,0.0005448849,0.0010060223,0.00056636456,0.0005863542,0.001742506],"category_scores_gemma":[0.0012841142,0.0003446552,0.00053865544,0.0003923536,0.00028666927,0.0009261982,0.0005209933,0.00071993424,0.00042380983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015314455,0.000076762335,0.0023429128,0.00017492675,0.000072887364,0.00005740741,0.00006413935,0.8991699,0.0029193691,0.0033397458,0.0019917462,0.08963708],"study_design_scores_gemma":[0.0000053162757,0.000016172778,0.00041912505,0.0000062477384,0.0000083532095,0.0000069015564,0.000004703935,0.9978573,0.0005437637,0.00085331016,0.00027373413,0.000005125056],"about_ca_topic_score_codex":0.0163688,"about_ca_topic_score_gemma":0.016432509,"teacher_disagreement_score":0.0163688,"about_ca_system_score_codex":0.0007267797,"about_ca_system_score_gemma":0.0012923263,"threshold_uncertainty_score":0.032547057},"labels":[],"label_agreement":null},{"id":"W4404514986","doi":"10.1016/j.egyai.2024.100446","title":"Decentralized coordination of distributed energy resources through local energy markets and deep reinforcement learning","year":2024,"lang":"en","type":"article","venue":"Energy and AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates; Natural Sciences and Engineering Research Council of Canada; Mitacs; University of Alberta; Alberta Machine Intelligence Institute","keywords":"Reinforcement learning; Energy (signal processing); Reinforcement; Distributed computing; Computer science; Distributed generation; Environmental economics; Artificial intelligence; Engineering; Economics; Renewable energy; Ecology; Biology; Physics","score_opus":0.0036564939444611354,"score_gpt":0.18870993167785502,"score_spread":0.1850534377333939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404514986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22719832,0.00050514867,0.76124686,0.0010937501,0.00010168572,0.00007860459,0.00020208258,0.0013774121,0.008196124],"genre_scores_gemma":[0.9730041,0.00006959066,0.024702039,0.00012979988,0.000016139218,0.000045609602,0.00010585393,0.00004182212,0.0018851402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999711,0.000089153786,0.000011563071,0.00008702518,0.00004258547,0.00005875007],"domain_scores_gemma":[0.99930894,0.00033013456,0.00011427057,0.00006620958,0.000101761114,0.000078793135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007613625,0.0006691572,0.0006248314,0.0002501839,0.00031682212,0.00088040705,0.0011778387,0.000784117,0.0016872237],"category_scores_gemma":[0.0022031476,0.00039969137,0.00041172776,0.00024226609,0.00089515536,0.0011402842,0.0011025156,0.0015698696,0.000287932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000449766,0.00004772668,0.00088785886,0.000018331843,0.000021893773,0.00003991811,0.000024214007,0.98108566,0.0006842334,0.002973939,0.00062991347,0.013541297],"study_design_scores_gemma":[0.000004754342,0.0000078701205,0.000053343974,0.0000013737485,0.000001407186,0.0000025321838,0.000003459844,0.998312,0.00013293931,0.0013647029,0.00011427399,0.0000013168519],"about_ca_topic_score_codex":0.008046593,"about_ca_topic_score_gemma":0.00993625,"teacher_disagreement_score":0.008046593,"about_ca_system_score_codex":0.0009811925,"about_ca_system_score_gemma":0.0010192868,"threshold_uncertainty_score":0.015999496},"labels":[],"label_agreement":null},{"id":"W4404515272","doi":"10.1016/j.tej.2024.107447","title":"Is it worthwhile to participate in transactive energy? A decision-making model for empowering residential customers","year":2024,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Business; Group decision-making; Decision-making models; Environmental economics; Knowledge management; Marketing; Computer science; Psychology; Economics; Social psychology","score_opus":0.021610082086503876,"score_gpt":0.296763006032032,"score_spread":0.2751529239455281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404515272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2483143,0.0005586556,0.67991245,0.008483644,0.0001431421,0.00036240811,0.00046403657,0.00021010931,0.0615513],"genre_scores_gemma":[0.9701376,0.0002392473,0.021302162,0.00018456188,0.00003691959,0.00016190938,0.000048986512,0.000016838407,0.007871832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984648,0.00081881706,0.00003926721,0.00028592785,0.00014074004,0.0002505304],"domain_scores_gemma":[0.99710137,0.0018150036,0.0003801781,0.00010708684,0.00020238252,0.00039399875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023649638,0.00082341826,0.00069008424,0.00040164083,0.0007450919,0.0028450384,0.001717284,0.0023607204,0.0073401337],"category_scores_gemma":[0.004712752,0.0004758736,0.00071235636,0.00057620683,0.0016569337,0.002458633,0.0015180808,0.0023438816,0.00053198606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028670524,0.0002690031,0.0017245902,0.00009314946,0.00004524277,0.0005157821,0.00060393004,0.6889706,0.0016840834,0.2928771,0.001872125,0.011057632],"study_design_scores_gemma":[0.00003394776,0.00006488965,0.0001974552,0.000011425982,0.000014930143,0.000029801298,0.00016693347,0.9498314,0.00015570733,0.04850067,0.0009771199,0.000015610616],"about_ca_topic_score_codex":0.004100173,"about_ca_topic_score_gemma":0.0037514567,"teacher_disagreement_score":0.0073401337,"about_ca_system_score_codex":0.002155614,"about_ca_system_score_gemma":0.0018866335,"threshold_uncertainty_score":0.024555206},"labels":[],"label_agreement":null},{"id":"W4404670555","doi":"10.1016/j.compeleceng.2024.109895","title":"Eco-power management system with operation and voltage security objectives of distribution system operator considering networked virtual power plants with electric vehicles parking lot and price-based demand response","year":2024,"lang":"en","type":"article","venue":"Computers & Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Demand response; Operator (biology); Electric power system; Power (physics); Management system; Business; Distribution management system; Distribution (mathematics); Computer science; Environmental economics; Computer security; Engineering; Electrical engineering; Operations management; Economics; Electricity","score_opus":0.002468435195651508,"score_gpt":0.16027931838242737,"score_spread":0.15781088318677586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404670555","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7108687,0.00010687636,0.2610632,0.00043270545,0.000089130415,0.00011154752,0.00019010372,0.0007540103,0.026383745],"genre_scores_gemma":[0.99791795,0.0000055510154,0.0009873415,0.0000072225384,0.0000036535712,0.000008154929,0.000013660063,0.000004334298,0.001052095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997811,0.000060770035,0.0000075849507,0.00006416477,0.00004134666,0.00004501091],"domain_scores_gemma":[0.9997023,0.00008658146,0.000039783077,0.000019841851,0.00011484508,0.000036634585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034317697,0.00037280098,0.0003731891,0.00023578733,0.00048769766,0.0010838762,0.00050851144,0.00045924724,0.0030993342],"category_scores_gemma":[0.00057423697,0.00018314186,0.00022634609,0.00023726694,0.00027366402,0.00059486873,0.00048285892,0.00027257294,0.0002467894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046541868,0.00022684566,0.0045629703,0.000045428624,0.000049767124,0.00032385028,0.000055419787,0.95498735,0.007179135,0.005729743,0.0014960553,0.024878051],"study_design_scores_gemma":[0.000011065774,0.00005737129,0.0009944516,0.0000015631182,0.000010871507,0.00001668974,0.000022588672,0.9974341,0.00055270124,0.0007061132,0.00018925227,0.000003257501],"about_ca_topic_score_codex":0.0046767057,"about_ca_topic_score_gemma":0.0070286314,"teacher_disagreement_score":0.0046767057,"about_ca_system_score_codex":0.00048038788,"about_ca_system_score_gemma":0.00055991503,"threshold_uncertainty_score":0.010368288},"labels":[],"label_agreement":null},{"id":"W4404708473","doi":"10.1109/tpwrd.2024.3505843","title":"A Mixed-Integer Nonlinear Model to Support the Operation of Distribution Systems With Hidden DERs","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Mitacs; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Nonlinear system; Integer (computer science); Applied mathematics; Mathematical optimization; Computer science; Distribution (mathematics); Mathematics; Control theory (sociology); Physics; Mathematical analysis; Artificial intelligence","score_opus":0.01395465714219386,"score_gpt":0.20473949819966758,"score_spread":0.19078484105747373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404708473","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009096164,0.00009469795,0.9870056,0.00018286647,0.0000396026,0.000027658569,0.000110772155,0.00011698522,0.0033257692],"genre_scores_gemma":[0.8302539,0.00028819585,0.15915065,0.00018074548,0.0000796792,0.00028969086,0.00040229224,0.00008504891,0.009269891],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968016,0.00013362903,0.000012598061,0.0000660767,0.000069912276,0.00003753257],"domain_scores_gemma":[0.9992663,0.0004651109,0.00009437755,0.000030145207,0.00011818083,0.000025916705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008542809,0.001030247,0.00069865835,0.00027251552,0.000286742,0.001170888,0.0010478052,0.0010090437,0.0023041647],"category_scores_gemma":[0.0019254585,0.0005397815,0.00063014915,0.00039126814,0.0005538471,0.00095862005,0.0008400865,0.0016397155,0.00040442887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014936727,0.0000113954075,0.00013682088,0.000020270696,0.000006403673,0.00002887219,0.000013243231,0.99380165,0.00032942352,0.0029423386,0.00021320074,0.0024814242],"study_design_scores_gemma":[0.0000012377666,0.0000037781099,0.000012103748,0.0000010116479,8.738576e-7,0.0000015455151,0.0000014504931,0.9995314,0.000033987817,0.0003290399,0.00008279224,7.6031546e-7],"about_ca_topic_score_codex":0.005988309,"about_ca_topic_score_gemma":0.0056276764,"teacher_disagreement_score":0.005988309,"about_ca_system_score_codex":0.0005785597,"about_ca_system_score_gemma":0.0008776485,"threshold_uncertainty_score":0.011906862},"labels":[],"label_agreement":null},{"id":"W4404788856","doi":"10.1109/tpwrd.2024.3507093","title":"Power Oscillation Localization: A Synchrophasor Based Adaptive Vold-Kalman Filtering Energy Flow","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Development Research Centre","funders":"National Natural Science Foundation of China","keywords":"Kalman filter; Oscillation (cell signaling); Power flow; Electric power system; Adaptive filter; Control theory (sociology); Flow (mathematics); Computer science; Power (physics); Engineering; Physics; Electronic engineering; Artificial intelligence; Mechanics","score_opus":0.008251429781092386,"score_gpt":0.18920954011917904,"score_spread":0.18095811033808665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404788856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004852822,0.000109642344,0.9939884,0.000045612025,0.000029954375,0.000016713577,0.000018237617,0.00025243717,0.00068609975],"genre_scores_gemma":[0.58580387,0.0005291948,0.40904337,0.00013802087,0.00007323686,0.0001613072,0.00029607993,0.0000780923,0.0038767168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996346,0.000065551125,0.00002991097,0.00011215058,0.00013041793,0.00002739074],"domain_scores_gemma":[0.999757,0.000087792614,0.00003694052,0.000023174685,0.00008591615,0.000009178095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006020095,0.0005597664,0.0005864931,0.00060798525,0.00033438217,0.00088620087,0.0008375651,0.000697111,0.001002002],"category_scores_gemma":[0.0013793634,0.0003530796,0.00051627477,0.00072396355,0.00035280234,0.0008447977,0.00068827474,0.0006117798,0.00033732853],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017322534,0.00007154043,0.002448203,0.00013501669,0.000080389975,0.000074582924,0.00014649982,0.5855444,0.014253092,0.007973547,0.0017925901,0.3873069],"study_design_scores_gemma":[0.000006976025,0.000021472653,0.00027648965,0.0000056531726,0.000006466694,0.000014392842,0.000005367554,0.99718624,0.0011108565,0.0006520948,0.0007061956,0.000007834197],"about_ca_topic_score_codex":0.007374065,"about_ca_topic_score_gemma":0.0052144807,"teacher_disagreement_score":0.007374065,"about_ca_system_score_codex":0.00045772063,"about_ca_system_score_gemma":0.0006390988,"threshold_uncertainty_score":0.014662325},"labels":[],"label_agreement":null},{"id":"W4404916251","doi":"10.1109/wccs62745.2024.10765521","title":"Optimization of Energy Costs Using Deep Reinforcement Learning in Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université TÉLUQ","funders":"","keywords":"Reinforcement learning; Computer science; Smart grid; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Electrical engineering; Structural engineering; Mathematics","score_opus":0.00848657564078697,"score_gpt":0.20510432541093088,"score_spread":0.1966177497701439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404916251","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14311866,0.0006376564,0.8494266,0.0009571288,0.000073767085,0.000049522278,0.0000827379,0.00048358054,0.0051703425],"genre_scores_gemma":[0.9815949,0.00012020627,0.01709408,0.00006172499,0.000012776983,0.000026352001,0.000026729664,0.000019289411,0.0010438468],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968743,0.00013465458,0.0000118284715,0.000048677575,0.00006320933,0.00005425117],"domain_scores_gemma":[0.9989737,0.0006820901,0.00012631353,0.000043567485,0.00011986218,0.000054323347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095957046,0.00049220625,0.00079937367,0.00021769838,0.0002283956,0.0007702238,0.0006165504,0.0006612949,0.0012464402],"category_scores_gemma":[0.0030674709,0.0002987609,0.00020746807,0.000304216,0.000778403,0.0010837471,0.00060061336,0.0010055385,0.00011508636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020811858,0.000015849051,0.00023325531,0.000009858089,0.0000056024983,0.000011780463,0.000005227988,0.9917768,0.00018026498,0.0027938806,0.00015943627,0.004787195],"study_design_scores_gemma":[0.0000034395475,0.0000047373,0.00003104092,0.0000010880101,9.843029e-7,0.0000014352174,0.000001306211,0.99790514,0.00008649335,0.0019145765,0.000048920036,9.025444e-7],"about_ca_topic_score_codex":0.0070502665,"about_ca_topic_score_gemma":0.006053458,"teacher_disagreement_score":0.0070502665,"about_ca_system_score_codex":0.0012735255,"about_ca_system_score_gemma":0.0011615559,"threshold_uncertainty_score":0.014018476},"labels":[],"label_agreement":null},{"id":"W4405057640","doi":"10.2139/ssrn.4988665","title":"An Economic analysis of Local Use of System charges for neighbourhood batteries VEPC Working Paper 2109a September 2021","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Neighbourhood (mathematics); Regional science; Economic geography; Business; Geography; Mathematics","score_opus":0.01020179418467565,"score_gpt":0.21887442601307364,"score_spread":0.208672631828398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405057640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85284317,0.0020020492,0.016601609,0.004683344,0.00018800635,0.00015647292,0.002316281,0.00011057258,0.121098496],"genre_scores_gemma":[0.98162407,0.00033794477,0.0005585697,0.0000510545,0.000024447485,0.000032201846,0.00020494359,0.000028151473,0.017138503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999318,0.00030106906,0.00001597209,0.000076534685,0.0001215245,0.00016691495],"domain_scores_gemma":[0.99828976,0.0011672385,0.00011896071,0.000086414366,0.00021292882,0.00012466239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010101075,0.00039323355,0.0006658626,0.0008161422,0.0007309591,0.0029165444,0.0011700172,0.0014318322,0.017818855],"category_scores_gemma":[0.0048335,0.0005624544,0.0011728577,0.0014205917,0.00096072303,0.0026409407,0.0009008341,0.0016355912,0.00083574106],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012058467,0.00052182074,0.012045943,0.0003377283,0.0003569395,0.0012912983,0.00037221107,0.71960163,0.0020457811,0.21452828,0.017801233,0.029891308],"study_design_scores_gemma":[0.0002426957,0.00061781466,0.023555247,0.00014006623,0.00043415517,0.00041371133,0.0030015758,0.85815424,0.0023383687,0.089111745,0.021847064,0.00014325698],"about_ca_topic_score_codex":0.042075206,"about_ca_topic_score_gemma":0.0430288,"teacher_disagreement_score":0.042075206,"about_ca_system_score_codex":0.0060649994,"about_ca_system_score_gemma":0.0017595366,"threshold_uncertainty_score":0.0836606},"labels":[],"label_agreement":null},{"id":"W4405272272","doi":"10.1109/ice3is62977.2024.10775349","title":"Remote Control of Residential Meter Involving E-Billing","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Metre; Computer science; Control (management); Remote sensing; Computer security; Geography; Artificial intelligence","score_opus":0.007426354976877705,"score_gpt":0.19726410398855176,"score_spread":0.18983774901167405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405272272","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2898709,0.0005691093,0.56857747,0.0010220879,0.0008893054,0.00077226764,0.00091908686,0.04066819,0.096711636],"genre_scores_gemma":[0.9761696,0.000044200853,0.008944692,0.00015486489,0.000054437554,0.00005872456,0.00011520925,0.00010840365,0.014349856],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995413,0.000089502464,0.000030084911,0.00013264519,0.00015494843,0.00005172502],"domain_scores_gemma":[0.99954337,0.00012146998,0.00005423141,0.00014705033,0.00010914541,0.000024745359],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030300836,0.00043268778,0.00037795646,0.00037144704,0.0003736148,0.0007479114,0.0008426881,0.00048445407,0.015829783],"category_scores_gemma":[0.0007006948,0.00011595373,0.00016454059,0.00022292015,0.00026385745,0.00067927496,0.00047067276,0.0003701958,0.0034688604],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019193569,0.0009468205,0.013001517,0.00055854314,0.000075848235,0.0021589573,0.0009890868,0.024994466,0.3020206,0.009929134,0.035625186,0.60778046],"study_design_scores_gemma":[0.00034154803,0.0015004957,0.020052083,0.00011903673,0.00009531079,0.0024002516,0.00044785012,0.5376563,0.32291955,0.008487597,0.10584007,0.00013995009],"about_ca_topic_score_codex":0.00062596204,"about_ca_topic_score_gemma":0.00062547275,"teacher_disagreement_score":0.015829783,"about_ca_system_score_codex":0.00018184379,"about_ca_system_score_gemma":0.00014923098,"threshold_uncertainty_score":0.052955866},"labels":[],"label_agreement":null},{"id":"W4405491980","doi":"10.1109/apee60256.2024.10790907","title":"Microgrid System Modelling for Hybrid Renewable Energy Market in Malaysia","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Universiti Teknologi Malaysia","keywords":"Microgrid; Renewable energy; Environmental economics; Computer science; Environmental science; Automotive engineering; Electrical engineering; Engineering; Economics","score_opus":0.00796157069038764,"score_gpt":0.17797855070092408,"score_spread":0.17001698001053644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405491980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77072096,0.0012354463,0.16140749,0.00059512374,0.00008041614,0.00021640313,0.0021591275,0.0005474441,0.063037574],"genre_scores_gemma":[0.9892018,0.0002181643,0.0038880256,0.000018623843,0.000005977791,0.00006270418,0.00022651516,0.000020970885,0.0063571353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998883,0.00004574548,0.000006047085,0.000019729301,0.000016456675,0.00002370903],"domain_scores_gemma":[0.9998111,0.00008515417,0.000031176347,0.000009166039,0.000048609883,0.0000147433575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002841227,0.0007421867,0.00057220476,0.00037227783,0.00042360177,0.0011393582,0.00064876233,0.0008844231,0.0036625739],"category_scores_gemma":[0.0004364648,0.00029107658,0.0007655808,0.00036932423,0.00034078088,0.00059727137,0.0006217859,0.0005834289,0.00036386435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023142731,0.000007960893,0.00054938934,0.00002426994,0.000008113789,0.00005532715,0.000021558255,0.9975057,0.0002322488,0.0005667542,0.00012999284,0.00087555253],"study_design_scores_gemma":[0.0000042636616,0.0000142929985,0.00029075428,0.0000049293258,0.000004427773,0.00000890365,0.000030535582,0.9990602,0.00009884173,0.00026596666,0.00021390535,0.0000029262835],"about_ca_topic_score_codex":0.042582136,"about_ca_topic_score_gemma":0.029752059,"teacher_disagreement_score":0.042582136,"about_ca_system_score_codex":0.0010000413,"about_ca_system_score_gemma":0.001038365,"threshold_uncertainty_score":0.08466852},"labels":[],"label_agreement":null},{"id":"W4405522038","doi":"10.1109/icue63019.2024.10795646","title":"A Comparative Analysis of Rule-Based and Optimization-Based Energy Management for a Campus Microgrid in Sri Lanka","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Microgrid; Sri lanka; Energy management; Computer science; Energy management system; Energy (signal processing); Operations research; Engineering; Environmental science; Artificial intelligence; Mathematics; Environmental planning; Statistics; Control (management)","score_opus":0.007935817566013331,"score_gpt":0.22517223399716238,"score_spread":0.21723641643114905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405522038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9811585,0.0003495798,0.00751871,0.000102463106,0.0000104983565,0.00010557045,0.0001580631,0.00031697378,0.010279657],"genre_scores_gemma":[0.99769634,0.00010323471,0.0015958974,0.0000060994657,0.0000011519696,0.000015104286,0.0001007024,0.000007960477,0.00047350107],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960893,0.00010172199,0.000039819977,0.00004754405,0.00011758314,0.00008440773],"domain_scores_gemma":[0.9992643,0.00025247037,0.000061365805,0.00007638758,0.00030553082,0.000039978127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067823473,0.00036353638,0.0005240069,0.0007093374,0.0004149861,0.0011841492,0.00068528426,0.00030347498,0.0011269946],"category_scores_gemma":[0.0013723687,0.00015898328,0.0004151266,0.0008457304,0.00031491707,0.0005377554,0.00041892426,0.0002059481,0.00020938458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009147911,0.0003108429,0.019254103,0.00038045226,0.00023033658,0.0004697992,0.0002573779,0.8924773,0.009296876,0.0020288553,0.0011052033,0.073274136],"study_design_scores_gemma":[0.000072285,0.0011291011,0.039112177,0.000031889576,0.00021077775,0.00017806877,0.0012824999,0.9455152,0.009732908,0.00041611592,0.0022687134,0.000050323022],"about_ca_topic_score_codex":0.03955155,"about_ca_topic_score_gemma":0.02796314,"teacher_disagreement_score":0.03955155,"about_ca_system_score_codex":0.0012795506,"about_ca_system_score_gemma":0.00076597265,"threshold_uncertainty_score":0.07864267},"labels":[],"label_agreement":null},{"id":"W4405537350","doi":"10.1088/1742-6596/2929/1/012009","title":"Digital Dynamic Agent (DDA) Driven Energy Contract Negotiation","year":2024,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of Windsor","funders":"","keywords":"Negotiation; Computer science; Computer security; Business; Political science","score_opus":0.008058648765338216,"score_gpt":0.201072768308549,"score_spread":0.1930141195432108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405537350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043657072,0.00017691207,0.9305506,0.0003587829,0.00014349667,0.00023132513,0.00011160696,0.0004981697,0.024272135],"genre_scores_gemma":[0.8693743,0.00012699202,0.12293275,0.00013002697,0.00003009495,0.00021517073,0.00012507197,0.000042569663,0.0070230584],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989372,0.00044320102,0.00008090209,0.00014328584,0.00027218898,0.00012330286],"domain_scores_gemma":[0.99890757,0.00047448595,0.00012744994,0.0001918922,0.0001488203,0.00014984254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016364236,0.0003141617,0.0004743659,0.00043663543,0.00063327386,0.0018524278,0.0012690519,0.0008882137,0.005380144],"category_scores_gemma":[0.0027763415,0.00020743761,0.00045072442,0.00043581854,0.0009924155,0.001722349,0.0022696985,0.0009034924,0.00051842653],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002899001,0.0002830129,0.0017896614,0.00017200955,0.00007953235,0.0004754697,0.00032343654,0.6458854,0.00918818,0.2446544,0.0030197399,0.09383925],"study_design_scores_gemma":[0.000038957398,0.00003888346,0.00012408296,0.0000084425255,0.000007910382,0.000076062635,0.00003252843,0.9711273,0.0018707088,0.018936165,0.0077264206,0.000012477243],"about_ca_topic_score_codex":0.0018732894,"about_ca_topic_score_gemma":0.0013050745,"teacher_disagreement_score":0.005380144,"about_ca_system_score_codex":0.000860068,"about_ca_system_score_gemma":0.0011902852,"threshold_uncertainty_score":0.017998397},"labels":[],"label_agreement":null},{"id":"W4405583005","doi":"10.2139/ssrn.5065088","title":"Optimal Sizing and Economic Analysis of Renewables for a Remote School: An Energy Modeling Approach","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Sizing; Renewable energy; Economic analysis; Environmental economics; Energy (signal processing); Economics; Computer science; Environmental science; Engineering; Mathematics; Agricultural economics; Electrical engineering; Chemistry","score_opus":0.01194722561097712,"score_gpt":0.2256936853302476,"score_spread":0.2137464597192705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405583005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24303883,0.0009761035,0.6801897,0.0024035603,0.00013878381,0.00022572964,0.00072319893,0.00038101908,0.07192303],"genre_scores_gemma":[0.9652723,0.0003642718,0.018503325,0.0000660947,0.000041427556,0.00010127683,0.00012864533,0.000087684246,0.0154350195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997708,0.00009446106,0.000006899259,0.00003967418,0.000046656838,0.000041559353],"domain_scores_gemma":[0.9996929,0.00021169912,0.000031814663,0.000014638267,0.00002882923,0.000020103103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053906435,0.0007735073,0.0012150505,0.0006544028,0.000594604,0.0015926545,0.0012007287,0.0016549535,0.008632793],"category_scores_gemma":[0.0014220393,0.0009990537,0.0011136916,0.0009633202,0.00073226396,0.0015171083,0.00072887994,0.0010982235,0.00047828225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015953643,0.000019830957,0.00009724049,0.00001349925,0.00000693727,0.000022373119,0.000006959522,0.9919823,0.00027881833,0.005620822,0.00020594943,0.0017292928],"study_design_scores_gemma":[0.0000060958046,0.000010265624,0.000094330375,0.0000020422633,0.0000051910065,0.0000045941283,0.000010607968,0.99640924,0.000071728486,0.0032308248,0.00015229313,0.0000028088434],"about_ca_topic_score_codex":0.021873884,"about_ca_topic_score_gemma":0.021604938,"teacher_disagreement_score":0.021873884,"about_ca_system_score_codex":0.0020007123,"about_ca_system_score_gemma":0.0017067833,"threshold_uncertainty_score":0.04349315},"labels":[],"label_agreement":null},{"id":"W4405599777","doi":"10.1109/access.2024.3520357","title":"Safe Deep Reinforcement Learning-Based Real-Time Multi-Energy Management in Combined Heat and Power Microgrids","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Social Sciences and Humanities Research Council of Canada; Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Reinforcement learning; Computer science; Energy management; Power (physics); Energy (signal processing); Power management; Reinforcement; Artificial intelligence; Engineering","score_opus":0.008669508604361359,"score_gpt":0.236029509902652,"score_spread":0.22736000129829065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405599777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06974331,0.0005087234,0.9247595,0.0003459116,0.00005178325,0.000039706283,0.000041646883,0.00090881094,0.0036005445],"genre_scores_gemma":[0.97571063,0.00009385732,0.022727016,0.000070348724,0.000009007729,0.000036217087,0.000033223572,0.00002551675,0.0012940667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997986,0.00006223723,0.000008342732,0.00004260419,0.000046114732,0.000042153402],"domain_scores_gemma":[0.9997085,0.00013367525,0.000045675184,0.000024620276,0.000059545426,0.000027956115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007162925,0.00055779685,0.000566749,0.00016783172,0.00023269549,0.00048336943,0.00070634973,0.0004867472,0.00096797507],"category_scores_gemma":[0.001116504,0.00029551162,0.00027521458,0.00015508186,0.00055516127,0.00064391847,0.0007153446,0.0009556299,0.00014290064],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037314236,0.000026192422,0.00030034615,0.00001845192,0.000011285371,0.00003645131,0.00002096247,0.97740614,0.0007615037,0.002239153,0.0002957272,0.018846504],"study_design_scores_gemma":[0.0000022076804,0.0000063290668,0.000023832654,9.961649e-7,0.0000010641675,0.0000017304174,0.0000011953294,0.9992099,0.00014448696,0.0005476897,0.00005968631,7.8298e-7],"about_ca_topic_score_codex":0.008933115,"about_ca_topic_score_gemma":0.0072586974,"teacher_disagreement_score":0.008933115,"about_ca_system_score_codex":0.00081288227,"about_ca_system_score_gemma":0.0012104415,"threshold_uncertainty_score":0.017762244},"labels":[],"label_agreement":null},{"id":"W4405601974","doi":"10.1109/synergymed62435.2024.10799384","title":"The nexus between design and control: a data-driven approach for leveraging flexibility potential of micro-grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Concordia University","funders":"Hydro-Québec","keywords":"Nexus (standard); Flexibility (engineering); Computer science; Control (management); Distributed computing; Industrial engineering; Systems engineering; Embedded system; Engineering; Artificial intelligence","score_opus":0.0471630452214629,"score_gpt":0.25096781852651573,"score_spread":0.20380477330505284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405601974","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024325356,0.00036891448,0.9656974,0.00094500574,0.000035996756,0.00009363251,0.00020853171,0.0003717728,0.007953407],"genre_scores_gemma":[0.7593053,0.0005462781,0.23572177,0.00017364397,0.00005003546,0.00022410636,0.00026065457,0.00011808876,0.0036000926],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948007,0.00016983802,0.000020659649,0.00010134008,0.00018397384,0.000044160708],"domain_scores_gemma":[0.9991191,0.00043634433,0.000113213486,0.0001291258,0.00016340271,0.00003869727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010849956,0.00074654777,0.0005303634,0.0005192957,0.00038355475,0.0018343778,0.0010486072,0.00065585977,0.0017713576],"category_scores_gemma":[0.0020985033,0.00048672908,0.0004696249,0.00051126693,0.0008887995,0.0011365879,0.00080564787,0.0009922354,0.00023548851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030334393,0.000037758746,0.0011231976,0.00008087328,0.000025811629,0.00004834371,0.00006539057,0.9452188,0.0012894238,0.016850699,0.00048310615,0.034746256],"study_design_scores_gemma":[0.000004038344,0.000017522303,0.00025543367,0.000015909234,0.0000054625243,0.000007547837,0.00003304377,0.9888833,0.0005653861,0.008634253,0.0015715815,0.0000066058738],"about_ca_topic_score_codex":0.023524845,"about_ca_topic_score_gemma":0.041861705,"teacher_disagreement_score":0.023524845,"about_ca_system_score_codex":0.0018329123,"about_ca_system_score_gemma":0.0025901329,"threshold_uncertainty_score":0.046775818},"labels":[],"label_agreement":null},{"id":"W4405602314","doi":"10.1109/synergymed62435.2024.10799262","title":"Towards dynamic pricing algorithm for residential buildings: A Model Predictive Control framework for load aggregation","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Collège Shawinigan; University of Waterloo; Université de Sherbrooke; Concordia University","funders":"Hydro-Québec","keywords":"Model predictive control; Computer science; Control (management); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics","score_opus":0.006608502889492049,"score_gpt":0.241367918935186,"score_spread":0.23475941604569395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405602314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054325964,0.000052121173,0.9926829,0.00010450438,0.000013814306,0.000019662531,0.000016541444,0.0001929881,0.0014848374],"genre_scores_gemma":[0.78039336,0.00020001458,0.21630754,0.00012635541,0.000059851827,0.00019366192,0.000121967496,0.00008961923,0.0025076803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999684,0.00009212997,0.000014110719,0.00006131645,0.00010648745,0.000042018055],"domain_scores_gemma":[0.999671,0.00014200126,0.00003802843,0.000024070661,0.000107023625,0.000017873268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009054577,0.00060947833,0.0008339515,0.00037728203,0.00042783224,0.0010682207,0.0011645656,0.0007446563,0.001582761],"category_scores_gemma":[0.0015958674,0.00038276231,0.0004893067,0.00055970874,0.00051457,0.0008030579,0.00070174993,0.0011970385,0.00030684366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000093079925,0.000015511452,0.00011475793,0.000009371698,0.0000071059753,0.000012514397,0.000018295494,0.9822005,0.00034309828,0.005104974,0.0002714853,0.0118931625],"study_design_scores_gemma":[0.0000010579126,0.0000023743428,0.00000889381,6.4316845e-7,5.8319387e-7,9.152555e-7,0.0000011672162,0.99915516,0.000032689448,0.0007310953,0.00006472641,7.016878e-7],"about_ca_topic_score_codex":0.0140959965,"about_ca_topic_score_gemma":0.010039546,"teacher_disagreement_score":0.0140959965,"about_ca_system_score_codex":0.00084256567,"about_ca_system_score_gemma":0.0012954985,"threshold_uncertainty_score":0.028027892},"labels":[],"label_agreement":null},{"id":"W4405720626","doi":"10.3390/en17246475","title":"Load Optimization for Connected Modern Buildings Using Deep Hybrid Machine Learning in Island Mode","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Herzberg Institute of Astrophysics; University of Victoria","funders":"","keywords":"Mean absolute percentage error; Mean squared error; Photovoltaic system; Random forest; Smart grid; Computer science; Automotive engineering; Efficient energy use; Building automation; Artificial neural network; Real-time computing; Engineering; Artificial intelligence; Electrical engineering; Statistics; Mathematics","score_opus":0.008350669229516309,"score_gpt":0.21777362157982658,"score_spread":0.20942295235031028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405720626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53549814,0.0012952116,0.44501618,0.0007110795,0.0001116523,0.00007368613,0.0004761658,0.002409578,0.014408269],"genre_scores_gemma":[0.98721236,0.00007597155,0.010133599,0.00007211881,0.000013638275,0.000025265315,0.00023118222,0.000036667403,0.0021991497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99990606,0.00001787604,0.000004083358,0.00002558491,0.000017604687,0.000028730383],"domain_scores_gemma":[0.9998685,0.000066134045,0.000013064759,0.0000071254267,0.00003287495,0.000012221999],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002518556,0.0009470355,0.00066718506,0.00039626588,0.0003316528,0.00074866944,0.00067808153,0.0007850616,0.0019004805],"category_scores_gemma":[0.00046083098,0.00042812256,0.0006022338,0.00039428138,0.0003173829,0.00062741764,0.0005090679,0.0005957246,0.0002953618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025378626,0.000024316196,0.0006780645,0.000012715764,0.000013846392,0.00002809967,0.0000076205683,0.98682284,0.00030424318,0.00019752656,0.00029408195,0.011591309],"study_design_scores_gemma":[0.000001078452,0.000003288003,0.00008339021,6.356086e-7,0.0000010098514,0.0000010248948,0.0000022611673,0.99969745,0.000044626075,0.00013195036,0.000032598324,7.939791e-7],"about_ca_topic_score_codex":0.037797373,"about_ca_topic_score_gemma":0.040561303,"teacher_disagreement_score":0.037797373,"about_ca_system_score_codex":0.0011384051,"about_ca_system_score_gemma":0.00065843697,"threshold_uncertainty_score":0.07515472},"labels":[],"label_agreement":null},{"id":"W4405919709","doi":"10.1016/j.ijhydene.2024.12.141","title":"Eco-friendly strategic decision-making towards grid modernization with fully renewable water and power community hubs","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Iran University of Science and Technology; Khalifa University of Science, Technology and Research","keywords":"Modernization theory; Renewable energy; Grid; Environmental economics; Power grid; Environmentally friendly; Power (physics); Business; Computer science; Environmental science; Economics; Engineering; Electrical engineering; Mathematics; Economic growth; Physics","score_opus":0.009127598173521087,"score_gpt":0.22859665773228036,"score_spread":0.21946905955875928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405919709","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5012558,0.00028616734,0.37488243,0.0077657667,0.00021541548,0.00031628594,0.0002412325,0.00040824641,0.11462864],"genre_scores_gemma":[0.9815825,0.000052575655,0.015050964,0.000091964255,0.000013091946,0.00002162193,0.000031245938,0.000010859941,0.0031450454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945635,0.00022398746,0.000010415257,0.00005773518,0.00010660972,0.00014497414],"domain_scores_gemma":[0.99901617,0.0003374513,0.000089089524,0.00010291095,0.00024654935,0.00020787175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001540105,0.00027593577,0.00020074427,0.00028256778,0.0007237797,0.0022168052,0.0007332852,0.0009263548,0.005677063],"category_scores_gemma":[0.002227563,0.0001788785,0.00022269138,0.0003925798,0.00050217443,0.002652048,0.0016967084,0.00082833203,0.0004161875],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005891385,0.00057111797,0.007087571,0.00017020035,0.00010620868,0.0008137169,0.0006023527,0.45215386,0.013079359,0.31315532,0.013901677,0.19776946],"study_design_scores_gemma":[0.000085593594,0.00033305047,0.004981402,0.00007819614,0.000047340418,0.00011027897,0.0028045757,0.6920182,0.007734213,0.2630379,0.02871111,0.000058095808],"about_ca_topic_score_codex":0.0028902625,"about_ca_topic_score_gemma":0.008625805,"teacher_disagreement_score":0.005677063,"about_ca_system_score_codex":0.0008160111,"about_ca_system_score_gemma":0.0026575197,"threshold_uncertainty_score":0.018991709},"labels":[],"label_agreement":null},{"id":"W4405935104","doi":"10.1109/icrera62673.2024.10815252","title":"Hybrid Renewable Energy Systems and Their Optimization for Remote Community Applications","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Renewable energy; Computer science; Electrical engineering; Engineering","score_opus":0.012479666108612224,"score_gpt":0.20126546105560925,"score_spread":0.18878579494699702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405935104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40149352,0.0016999813,0.53671193,0.0006088331,0.00006971441,0.00031830996,0.00034233675,0.00043181996,0.058323506],"genre_scores_gemma":[0.96171093,0.0003295232,0.03279637,0.00003369094,0.000007692845,0.00010774492,0.00009071266,0.000029909581,0.0048935018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998274,0.00006223225,0.0000039327415,0.000019771776,0.00006000276,0.000026650452],"domain_scores_gemma":[0.99986625,0.000072075774,0.000017286626,0.000005739752,0.000027802478,0.000010887961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040570853,0.0005933803,0.00047628814,0.0004220397,0.00042271437,0.00086706225,0.0005647576,0.0006822083,0.0026540086],"category_scores_gemma":[0.00058045454,0.00027431655,0.00046010912,0.0005843304,0.0003464248,0.00038071876,0.0005262252,0.0004899608,0.00018829694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000084932735,0.000015953041,0.00016240892,0.000013725455,0.00000702372,0.000020001276,0.000004585834,0.9960949,0.00027457142,0.00070853624,0.00009090102,0.002598875],"study_design_scores_gemma":[0.00000764277,0.000026586742,0.000182094,0.0000036201802,0.0000035361568,0.00000681115,0.000019608338,0.99862313,0.00012104814,0.0006308561,0.00037246928,0.0000025828922],"about_ca_topic_score_codex":0.04107143,"about_ca_topic_score_gemma":0.055914428,"teacher_disagreement_score":0.04107143,"about_ca_system_score_codex":0.0010976095,"about_ca_system_score_gemma":0.0012217223,"threshold_uncertainty_score":0.08166468},"labels":[],"label_agreement":null},{"id":"W4405968134","doi":"10.1109/tsg.2024.3524622","title":"A Multi-Area Architecture for Real-Time Feedback-Based Optimization of Distribution Grids","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"","keywords":"Architecture; Computer science; Distribution (mathematics); Real-time computing; Distributed computing; Mathematics","score_opus":0.00904565983982121,"score_gpt":0.21586090071237485,"score_spread":0.20681524087255365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405968134","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019365832,0.00014165872,0.975519,0.00016624831,0.000052686053,0.000051910156,0.00003240487,0.00083594787,0.003834246],"genre_scores_gemma":[0.9159719,0.000089962174,0.08144716,0.00008150706,0.000034644396,0.000093846626,0.000044267905,0.000034624118,0.0022020796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995695,0.000109380955,0.000024301768,0.00012285946,0.00013257886,0.0000413564],"domain_scores_gemma":[0.99969566,0.00008235262,0.0000481858,0.00004895059,0.000099499295,0.000025352352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006922161,0.00049835036,0.00033752318,0.00025278592,0.00044015664,0.00086143275,0.0010085593,0.0004920189,0.0029966144],"category_scores_gemma":[0.0008212477,0.00019908801,0.0002598406,0.00028941903,0.0005758727,0.00087284774,0.0008986626,0.0008801793,0.0003934085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013032532,0.00008030297,0.00047977213,0.000081531936,0.000027866028,0.00010075919,0.00015027702,0.89716977,0.019364564,0.015525342,0.0015460701,0.06534348],"study_design_scores_gemma":[0.000010209371,0.000047674333,0.00007875528,0.000003934596,0.0000046905343,0.000013943275,0.000009515554,0.9949462,0.0015945239,0.0023420153,0.00094355317,0.000004917405],"about_ca_topic_score_codex":0.0029628824,"about_ca_topic_score_gemma":0.004202719,"teacher_disagreement_score":0.0029966144,"about_ca_system_score_codex":0.00061168475,"about_ca_system_score_gemma":0.0006851566,"threshold_uncertainty_score":0.010024726},"labels":[],"label_agreement":null},{"id":"W4405995562","doi":"10.1038/s44284-024-00178-7","title":"Decarbonizing urban residential communities with green hydrogen systems","year":2025,"lang":"en","type":"article","venue":"Nature Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alliance de recherche numérique du Canada; China Scholarship Council; University of Alberta","keywords":"Green infrastructure; Business; Geography; Environmental planning","score_opus":0.004554744433323185,"score_gpt":0.18826270223356997,"score_spread":0.1837079578002468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405995562","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85661554,0.00012842726,0.11206401,0.0010696787,0.00004127258,0.0002080211,0.00073815114,0.00023871697,0.028896246],"genre_scores_gemma":[0.9877389,0.00010427189,0.008357486,0.000055498396,0.000003861025,0.000075774165,0.00010018591,0.000018135746,0.0035458275],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997794,0.000087734814,0.000004000215,0.000039078208,0.00003125293,0.000058559588],"domain_scores_gemma":[0.9998067,0.00006207348,0.000028308485,0.000015966953,0.000048237638,0.000038608516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029394595,0.0005265092,0.00028550977,0.00026909943,0.00059448276,0.0010276997,0.00074677303,0.0007351303,0.0029811675],"category_scores_gemma":[0.00067233935,0.00027770724,0.00042494293,0.00035458404,0.0005016173,0.0014448157,0.0011537321,0.00046749559,0.00019962936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038527523,0.00006242439,0.0038211483,0.000024027895,0.000018660548,0.00011623569,0.00009061514,0.97983027,0.00097451033,0.009672075,0.0006226846,0.004728908],"study_design_scores_gemma":[0.000021183787,0.00006915703,0.0021387746,0.000010570839,0.000016370184,0.000020911306,0.0004661158,0.9868685,0.000597319,0.0077119754,0.0020661536,0.000012979099],"about_ca_topic_score_codex":0.038829565,"about_ca_topic_score_gemma":0.0626936,"teacher_disagreement_score":0.038829565,"about_ca_system_score_codex":0.0018876833,"about_ca_system_score_gemma":0.0013975105,"threshold_uncertainty_score":0.07720709},"labels":[],"label_agreement":null},{"id":"W4406011507","doi":"10.1016/j.enbuild.2024.115209","title":"Robust peer-to-peer federated learning for non-intrusive load monitoring in smart homes","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Peer-to-peer; Peer review; Computer science; Internet privacy; Computer network; Political science","score_opus":0.008426662300074704,"score_gpt":0.21720715312687922,"score_spread":0.2087804908268045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406011507","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12899832,0.0003131648,0.86631805,0.00018319566,0.0000957143,0.00009313222,0.0000563404,0.002240186,0.001701857],"genre_scores_gemma":[0.9779415,0.00003676812,0.021076467,0.000043939795,0.000022681666,0.000023747707,0.00003220206,0.000024032175,0.0007986617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988927,0.0002960253,0.00005581136,0.00028497732,0.00032492957,0.00014554744],"domain_scores_gemma":[0.99852884,0.0006594681,0.0001400795,0.00028176064,0.000315227,0.00007459422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012527865,0.00047550583,0.0012983826,0.00031500985,0.00062618015,0.0008049169,0.0015065861,0.0008717726,0.0010302454],"category_scores_gemma":[0.0032327073,0.00022812701,0.00024234533,0.00034011193,0.0005444473,0.0016617656,0.001465997,0.00073975447,0.00031377914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013402274,0.00069183426,0.0028932628,0.00017729198,0.0001175447,0.00036998742,0.00030586703,0.5141524,0.023889108,0.005697265,0.0038146188,0.4465506],"study_design_scores_gemma":[0.000015060574,0.00009778337,0.0003862932,0.000003976819,0.000008543946,0.000070537055,0.000043522647,0.99179757,0.004152301,0.0030778602,0.00033954342,0.000006973918],"about_ca_topic_score_codex":0.0012885291,"about_ca_topic_score_gemma":0.0016167631,"teacher_disagreement_score":0.0015065861,"about_ca_system_score_codex":0.00043377787,"about_ca_system_score_gemma":0.00062728487,"threshold_uncertainty_score":0.006625414},"labels":[],"label_agreement":null},{"id":"W4406163629","doi":"10.1109/icvee63912.2024.10823780","title":"Design and Evaluation of On-Grid Solar Rooftop Power Plant for Tower I of Ministry 3 Building in the New Indonesian Capital City","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Indonesian; Architectural engineering; Grid; Christian ministry; Grid parity; Capital city; Photovoltaic system; Civil engineering; Environmental science; Meteorology; Photovoltaics; Engineering; Electrical engineering; Geography; Political science","score_opus":0.029164457075505995,"score_gpt":0.25952526779005286,"score_spread":0.23036081071454687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406163629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9859585,0.00006760732,0.006966626,0.000038774626,0.000012305575,0.00010690133,0.00017104286,0.00015804493,0.006520206],"genre_scores_gemma":[0.99594754,0.000035619927,0.0030888282,0.0000058594164,0.0000010133374,0.000025722367,0.000071864946,0.000011201244,0.000812297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99979347,0.00005046433,0.000008103435,0.000042793607,0.000066156135,0.00003902103],"domain_scores_gemma":[0.99987984,0.000024192335,0.00001774081,0.000014188261,0.000034443743,0.000029525649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002232211,0.0004150237,0.00045082974,0.00028042236,0.000396985,0.0006709606,0.0006182993,0.0004986906,0.0021346868],"category_scores_gemma":[0.0002092838,0.0002595732,0.00053277164,0.00020599425,0.0002175722,0.00024687083,0.00026547394,0.00028426226,0.00032944436],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084151985,0.00064535596,0.020396696,0.00047885202,0.000110910136,0.0014820097,0.00020436592,0.83488965,0.105447575,0.0007817403,0.001400183,0.033321187],"study_design_scores_gemma":[0.0002635215,0.0033779622,0.03802719,0.000031999716,0.00016693531,0.00030848035,0.00049511367,0.89884204,0.055399682,0.00034130996,0.0026926247,0.000053076245],"about_ca_topic_score_codex":0.0057435795,"about_ca_topic_score_gemma":0.0075139618,"teacher_disagreement_score":0.0057435795,"about_ca_system_score_codex":0.00072972407,"about_ca_system_score_gemma":0.00053118606,"threshold_uncertainty_score":0.01142031},"labels":[],"label_agreement":null},{"id":"W4406278298","doi":"10.1016/j.jup.2025.101890","title":"Impact of distribution locational marginal pricing and cost-sharing pricing mechanisms on fairness, efficiency, and voltage quality in transactive energy systems","year":2025,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Transactive memory; Marginal cost; Microeconomics; Quality (philosophy); Environmental economics; Business; Distribution (mathematics); Industrial organization; Variable pricing; Energy (signal processing); Economics; Computer science; Mathematics; Knowledge management","score_opus":0.010555486695844822,"score_gpt":0.26880192028032945,"score_spread":0.2582464335844846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406278298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8965517,0.000437956,0.0830665,0.0015342725,0.00016593434,0.00006728624,0.00015805189,0.00016569841,0.017852444],"genre_scores_gemma":[0.9988175,0.000021432226,0.00073377945,0.000023998742,0.000010859418,0.000003359384,0.000005306103,0.000006114,0.00037764577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954417,0.0026681717,0.0001437396,0.0003044805,0.0006249423,0.0008170037],"domain_scores_gemma":[0.97139424,0.021768672,0.0016796914,0.0017423114,0.0025212714,0.0008938304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009077486,0.0004895061,0.0010196165,0.0005293556,0.0008623743,0.0036471526,0.0018463123,0.0010654756,0.0039841807],"category_scores_gemma":[0.031240117,0.00044497507,0.00056974846,0.0006836115,0.0016805346,0.0044153607,0.0014563751,0.0015361258,0.00018030337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002279791,0.00050708407,0.007294024,0.0000940695,0.00016932382,0.00020903377,0.00024991264,0.8018853,0.003774042,0.15293495,0.0011021565,0.029500313],"study_design_scores_gemma":[0.00017771375,0.00040993598,0.006348837,0.00002063757,0.00014365124,0.00009130278,0.0003493679,0.9266636,0.0030372723,0.061820272,0.00087635673,0.00006101423],"about_ca_topic_score_codex":0.0075207246,"about_ca_topic_score_gemma":0.0068055554,"teacher_disagreement_score":0.009077486,"about_ca_system_score_codex":0.0034830703,"about_ca_system_score_gemma":0.0025460203,"threshold_uncertainty_score":0.04800695},"labels":[],"label_agreement":null},{"id":"W4406431439","doi":"10.1016/s0197-2510(11)70181-4","title":"10.1016/s0197-2510(11)70181-4","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.003088030958680888,"score_gpt":0.13397992528733696,"score_spread":0.13089189432865608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406431439","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00026812582,0.00036519882,0.00067526463,0.00036670163,0.0003113008,0.00007366572,0.00065744255,0.0007987698,0.99648345],"genre_scores_gemma":[0.00044917522,0.00015354174,0.0002442186,0.00013964692,0.00005208777,0.00003579926,0.00029633648,0.00012047389,0.99850863],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994336,0.000034390665,0.000045831373,0.00018105618,0.00018344513,0.000121577155],"domain_scores_gemma":[0.99824166,0.00042754645,0.00013536097,0.00020365484,0.00039156488,0.0006003013],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00096956856,0.0022758143,0.0016747764,0.0026090231,0.002228516,0.0043474957,0.0031719017,0.005910483,0.9857723],"category_scores_gemma":[0.0016476844,0.00088996976,0.0013907327,0.0026433305,0.0016657551,0.004786912,0.0027711634,0.0025384196,0.99151576],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024073238,0.00015375123,0.00058946793,0.00053589937,0.000032478732,0.00019619505,0.00009825861,0.00041458276,0.0018312199,0.0069104116,0.39172646,0.5972706],"study_design_scores_gemma":[0.000031517407,0.00007445568,0.00036815743,0.00022703488,0.000009050244,0.00019824914,0.00008177107,0.00017657768,0.0003082099,0.0005851315,0.99792296,0.000016881464],"about_ca_topic_score_codex":0.0043889224,"about_ca_topic_score_gemma":0.0032575284,"teacher_disagreement_score":0.014227688,"about_ca_system_score_codex":0.0012850789,"about_ca_system_score_gemma":0.0014065679,"threshold_uncertainty_score":0.02029407},"labels":[],"label_agreement":null},{"id":"W4406522135","doi":"10.1109/access.2025.3531300","title":"Loads Mismatch and Network Voltage Behavior for Future Planning of Demand Response With Customer Satisfaction","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Atlantic Canada Opportunities Agency","keywords":"Customer satisfaction; Demand response; Computer science; Voltage; Business; Electrical engineering; Engineering; Marketing; Electricity","score_opus":0.009773777559578376,"score_gpt":0.26715839454828877,"score_spread":0.2573846169887104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406522135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45209768,0.00021941285,0.52912354,0.00074652565,0.000031965006,0.0001802431,0.00090156676,0.00058193837,0.016117187],"genre_scores_gemma":[0.99040425,0.00004662277,0.008666415,0.000022002043,0.000004383846,0.00003079567,0.00015849601,0.000021869038,0.00064522127],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975175,0.000116809584,0.000009769794,0.000030762418,0.00005263951,0.000038255577],"domain_scores_gemma":[0.99952245,0.00020941126,0.00007376378,0.000035700632,0.00012294824,0.00003567967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000526304,0.00045364146,0.00039930994,0.000329918,0.00021313778,0.0010147102,0.000477453,0.00047016333,0.0026041798],"category_scores_gemma":[0.0018414083,0.00024465745,0.00029794,0.00061617355,0.0001683698,0.0012262751,0.0003297331,0.0005346307,0.0003424145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008535597,0.000040331455,0.0060529965,0.000028957826,0.000012438012,0.000054060318,0.00005265082,0.9762398,0.0017531655,0.002919597,0.0006292269,0.01213143],"study_design_scores_gemma":[0.0000016266782,0.000028078495,0.0014361973,0.000004064158,0.000003390447,0.000007623415,0.000070599766,0.9965503,0.00040558007,0.0012269658,0.00025942535,0.0000060613093],"about_ca_topic_score_codex":0.0076169735,"about_ca_topic_score_gemma":0.010780519,"teacher_disagreement_score":0.0076169735,"about_ca_system_score_codex":0.0008871868,"about_ca_system_score_gemma":0.0006832383,"threshold_uncertainty_score":0.015145242},"labels":[],"label_agreement":null},{"id":"W4406657552","doi":"10.1109/tia.2025.3532570","title":"A Novel Stochastic Volt/VAR/Pressure Optimization-Based Conservation Voltage Reduction Technique in Integrated Electricity and Natural Gas Systems With PV Smart Inverters","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"University of Saskatchewan","keywords":"Voltage reduction; Volt; Reduction (mathematics); Voltage; Natural gas; Electricity; Electrical engineering; Engineering; Computer science; Electronic engineering; Automotive engineering; Waste management; Mathematics","score_opus":0.006418596831305362,"score_gpt":0.19861856689761792,"score_spread":0.19219997006631256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406657552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010111564,0.000075173375,0.9876814,0.000050146893,0.000015828311,0.000022662376,0.000014571549,0.0002119203,0.0018167633],"genre_scores_gemma":[0.7603014,0.00011900776,0.2358907,0.00009581439,0.000039328745,0.0000771271,0.000082247534,0.00009195067,0.0033023288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971455,0.000050552724,0.0000087266135,0.000041166233,0.00015013845,0.00003482519],"domain_scores_gemma":[0.999835,0.000059523212,0.00003197301,0.000017243065,0.00004393129,0.000012233764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004151792,0.0005069383,0.00061743776,0.00023253889,0.0002363196,0.00046366113,0.0008894382,0.00028757344,0.0010427311],"category_scores_gemma":[0.0005018579,0.0003593983,0.0005091126,0.0003523672,0.00025120692,0.0004653632,0.00046057516,0.00067325786,0.00013746155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054778495,0.000059198897,0.00032165312,0.00004545725,0.000027771803,0.00006957006,0.000036097703,0.918036,0.0066574477,0.0076614073,0.00089150236,0.06613919],"study_design_scores_gemma":[0.000003361513,0.000017966793,0.000037629623,8.919703e-7,0.000001932246,0.000007949961,0.0000016490378,0.9988673,0.00041606327,0.00041500913,0.00022885346,0.0000015082412],"about_ca_topic_score_codex":0.0040571326,"about_ca_topic_score_gemma":0.0043768496,"teacher_disagreement_score":0.0040571326,"about_ca_system_score_codex":0.00033078663,"about_ca_system_score_gemma":0.00074978505,"threshold_uncertainty_score":0.008067071},"labels":[],"label_agreement":null},{"id":"W4406661871","doi":"10.24018/ejece.2024.8.6.652","title":"Design and Analysis of an On-Grid Solar System House in Lahore, Pakistan","year":2024,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Grid; Architectural engineering; Geography; Telecommunications; Computer science; Engineering; Geodesy","score_opus":0.0069407728722389985,"score_gpt":0.19154361307963008,"score_spread":0.1846028402073911,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406661871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89033866,0.0001480198,0.077663094,0.0002311409,0.000047933878,0.00036898913,0.00032437305,0.00051113404,0.030366551],"genre_scores_gemma":[0.98807484,0.000060496062,0.0074362378,0.00001667624,0.0000031633344,0.00006720301,0.00006637847,0.000019017276,0.0042560785],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982685,0.00004674283,0.000004662025,0.000026359048,0.00006297318,0.000032459247],"domain_scores_gemma":[0.9998927,0.000031839114,0.0000143011175,0.000009793187,0.00003216027,0.00001910723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002518525,0.0003726702,0.0005546327,0.000244271,0.00074186106,0.00092349073,0.0005883617,0.00053171767,0.0043558897],"category_scores_gemma":[0.00021807713,0.00027757965,0.00046014687,0.0001445595,0.00035937276,0.0003141003,0.00036069026,0.0002857982,0.0004901745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034754045,0.00022659534,0.007541766,0.00026518095,0.000051142873,0.001227885,0.00022006883,0.9257875,0.03323277,0.00235268,0.001202009,0.027544813],"study_design_scores_gemma":[0.000107659645,0.0012640584,0.0073091704,0.00001566638,0.00007594541,0.00024072167,0.00037126057,0.97144306,0.014229572,0.0006032352,0.004313622,0.00002599204],"about_ca_topic_score_codex":0.011907355,"about_ca_topic_score_gemma":0.010644066,"teacher_disagreement_score":0.011907355,"about_ca_system_score_codex":0.001028446,"about_ca_system_score_gemma":0.0010453141,"threshold_uncertainty_score":0.023676097},"labels":[],"label_agreement":null},{"id":"W4406670709","doi":"10.1016/b978-0-08-052042-1.50017-1","title":"10.1016/b978-0-08-052042-1.50017-1","year":2000,"lang":"en","type":"book-chapter","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Battery (electricity); Mains electricity; Electrical engineering; Computer science; Automotive battery; Engineering; Automotive engineering; Power (physics); Physics; Voltage","score_opus":0.006490412200340289,"score_gpt":0.1476237851612387,"score_spread":0.1411333729608984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406670709","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013353495,0.00028454926,0.0007702466,0.000231468,0.00012439219,0.000030474781,0.00045295426,0.0006143082,0.99735814],"genre_scores_gemma":[0.00044945918,0.00020672912,0.00029131357,0.000087823355,0.000026063035,0.000023391647,0.0002814204,0.00018203878,0.9984517],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999658,0.000020931515,0.000019200112,0.00011168357,0.00013007021,0.000060168153],"domain_scores_gemma":[0.9989042,0.00032111345,0.00007300663,0.00016857494,0.00024766012,0.0002853817],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00067399006,0.0016711131,0.001052732,0.0015875726,0.0011802342,0.0045489804,0.0022532092,0.0035772743,0.97128],"category_scores_gemma":[0.0013017048,0.0006759653,0.000684442,0.0019573616,0.0009590179,0.00394338,0.0023069277,0.0018002627,0.98534703],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093039926,0.00009147291,0.0003091745,0.000344467,0.000013397372,0.00010479323,0.00008740568,0.00035713875,0.002097246,0.00876144,0.42107067,0.5666698],"study_design_scores_gemma":[0.000009664332,0.000028591028,0.00032328884,0.0001788322,0.000004750302,0.00011879121,0.000057841622,0.00011177913,0.00023770538,0.0011026383,0.99781764,0.000008446448],"about_ca_topic_score_codex":0.0034760248,"about_ca_topic_score_gemma":0.0033167908,"teacher_disagreement_score":0.028720021,"about_ca_system_score_codex":0.00093001564,"about_ca_system_score_gemma":0.00075598207,"threshold_uncertainty_score":0.040965557},"labels":[],"label_agreement":null},{"id":"W4406671889","doi":"10.1016/b978-0-08-051702-5.50009-7","title":"10.1016/b978-0-08-051702-5.50009-7","year":2000,"lang":"en","type":"book-chapter","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Computer science; Mathematics; Mathematical analysis","score_opus":0.00570467863569415,"score_gpt":0.14392816923358098,"score_spread":0.13822349059788683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406671889","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015012003,0.0003925457,0.0009945022,0.00023877021,0.000145809,0.000034119323,0.00053541263,0.0007784482,0.9967303],"genre_scores_gemma":[0.0005116917,0.00023333718,0.00035771696,0.00008906801,0.000028002421,0.000025270112,0.00033176522,0.00020909807,0.9982141],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99964046,0.000022785907,0.000020805708,0.000114110684,0.00013898285,0.00006278731],"domain_scores_gemma":[0.99883705,0.00036547187,0.00007656815,0.00019138998,0.00025109606,0.00027841952],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007236548,0.0017327104,0.0011518454,0.0016777266,0.0011488387,0.0044588004,0.0023990648,0.0036873498,0.9703409],"category_scores_gemma":[0.001222582,0.0007355609,0.0007614622,0.0020271402,0.0010315615,0.0038531045,0.0024627293,0.0018760811,0.98527807],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000103197934,0.00009081765,0.0002877527,0.00039662147,0.000015909902,0.000105252,0.00007477734,0.00036056497,0.0025633315,0.00868667,0.3846751,0.6026399],"study_design_scores_gemma":[0.000011797988,0.000034094333,0.00032258953,0.0001873867,0.000005618265,0.00014418774,0.00005132834,0.00012714698,0.00035525448,0.0011649252,0.9975858,0.000009753741],"about_ca_topic_score_codex":0.002800437,"about_ca_topic_score_gemma":0.0028394174,"teacher_disagreement_score":0.029659092,"about_ca_system_score_codex":0.0009172422,"about_ca_system_score_gemma":0.00071873254,"threshold_uncertainty_score":0.042305112},"labels":[],"label_agreement":null},{"id":"W4406747467","doi":"10.1016/j.apenergy.2025.125373","title":"Quantifying spatio-temporal carbon intensity within a city using large-scale smart meter data: Unveiling the impact of behind-the-meter generation","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Japan Science and Technology Agency; Council for Science, Technology and Innovation; Swine Innovation Porc","keywords":"Metre; Intensity (physics); Scale (ratio); Environmental science; Smart meter; Carbon fibers; Engineering; Computer science; Electrical engineering; Geography; Cartography; Smart grid; Physics; Optics","score_opus":0.05359290881789199,"score_gpt":0.27695641640802904,"score_spread":0.22336350759013704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406747467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9085332,0.0005889543,0.06159194,0.00050420966,0.00013551595,0.00012370279,0.020566937,0.0013685699,0.0065869205],"genre_scores_gemma":[0.96519876,0.00019053044,0.025170924,0.000054023898,0.000030941,0.0000724096,0.008636564,0.00006843121,0.00057746767],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997199,0.00004565776,0.000024113011,0.00009564543,0.00006995287,0.000044770477],"domain_scores_gemma":[0.9994361,0.00014493828,0.00010274518,0.0001221276,0.00015458395,0.00003961221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032347502,0.0005634433,0.00034264784,0.0018187073,0.00023775901,0.0009483028,0.00052012765,0.00049007736,0.00072431687],"category_scores_gemma":[0.0013854654,0.00020030566,0.00059521693,0.0029625036,0.0002037158,0.0009866237,0.000664183,0.00041325108,0.00030319128],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025548416,0.00025875508,0.6086464,0.00053498667,0.0005244077,0.0008332766,0.0010382318,0.21425474,0.014507809,0.0030831504,0.01032889,0.1457339],"study_design_scores_gemma":[0.00002776326,0.00003851567,0.39506245,0.00007110093,0.00011607921,0.00022022816,0.0014002112,0.57799256,0.007418658,0.0027483837,0.014823102,0.000080961334],"about_ca_topic_score_codex":0.022095462,"about_ca_topic_score_gemma":0.046711717,"teacher_disagreement_score":0.022095462,"about_ca_system_score_codex":0.00054010167,"about_ca_system_score_gemma":0.00048619258,"threshold_uncertainty_score":0.04393375},"labels":[],"label_agreement":null},{"id":"W4406853528","doi":"10.1080/03036758.2024.2446746","title":"The role of smart community microgrids in Aotearoa's energy future","year":2025,"lang":"en","type":"article","venue":"Journal of the Royal Society of New Zealand","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Strategic Science Fund","keywords":"Aotearoa; Environmental science; Environmental resource management; Earth science; Sociology; Geology; Gender studies","score_opus":0.0038521178592622945,"score_gpt":0.19253022017183719,"score_spread":0.1886781023125749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406853528","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44978353,0.027832944,0.038963277,0.118123665,0.0013871123,0.0003608775,0.0003977288,0.000835539,0.36231533],"genre_scores_gemma":[0.94545597,0.008893394,0.018719535,0.0010990425,0.00008403566,0.000058253507,0.00013011007,0.000043085958,0.025516525],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996407,0.00007852668,0.000010995285,0.000042384963,0.00012656214,0.00010090606],"domain_scores_gemma":[0.9993036,0.00008289653,0.00006588886,0.000044796285,0.00019895822,0.0003039186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014471193,0.00020921914,0.00016568611,0.00027019563,0.0013144917,0.0021966435,0.00063518126,0.0009505443,0.004851097],"category_scores_gemma":[0.0011730504,0.00014218802,0.00017214443,0.00039406514,0.0013477157,0.0024884131,0.0018955924,0.0007819974,0.00040511123],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044572534,0.00031958494,0.016467864,0.0010637918,0.000052610787,0.0048349816,0.0065678186,0.027367497,0.014548529,0.25740907,0.07430795,0.5966146],"study_design_scores_gemma":[0.00008879836,0.00042314472,0.017554997,0.0006851666,0.000033166052,0.0017878116,0.011038569,0.036878437,0.0025444797,0.059384953,0.8694651,0.00011539869],"about_ca_topic_score_codex":0.093079455,"about_ca_topic_score_gemma":0.117882974,"teacher_disagreement_score":0.093079455,"about_ca_system_score_codex":0.0029912158,"about_ca_system_score_gemma":0.0060103177,"threshold_uncertainty_score":0.18507534},"labels":[],"label_agreement":null},{"id":"W4406939239","doi":"10.2139/ssrn.5117154","title":"Comparison of Machine Learning and Mpc Methods for Control of Home Battery Storage Systems in Distribution Grids","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Battery (electricity); Control (management); Model predictive control; Computer science; Battery storage; Control theory (sociology); Artificial intelligence; Power (physics); Physics; Thermodynamics","score_opus":0.010080282704014194,"score_gpt":0.29910303804809696,"score_spread":0.2890227553440828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406939239","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33649227,0.0076654893,0.6377473,0.00078867865,0.00036469716,0.00014810696,0.00015018515,0.0012289247,0.015414409],"genre_scores_gemma":[0.98087126,0.0004990371,0.017000625,0.00003539129,0.000039432172,0.000033534016,0.000056277284,0.000033276858,0.0014312104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936956,0.0002681996,0.00004493968,0.000060196817,0.0002094861,0.000047729085],"domain_scores_gemma":[0.99738246,0.0019036536,0.000114726965,0.0001247225,0.0004413501,0.0000330845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017220008,0.00056950364,0.0011002676,0.00057511276,0.00036843753,0.00081424636,0.00050409994,0.00061101903,0.001508394],"category_scores_gemma":[0.0038633232,0.00020404939,0.00035805994,0.0005439431,0.00031820577,0.0007242285,0.00042334586,0.00076503196,0.00016721146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042647915,0.00009213307,0.0006746452,0.00026264548,0.00008194172,0.00002025853,0.000038223712,0.88681805,0.0010101917,0.0018467085,0.0004510852,0.10827757],"study_design_scores_gemma":[0.000014563097,0.00005521983,0.0005333845,0.000007725572,0.0000119121305,0.00000445543,0.0000076569895,0.9981158,0.0005734536,0.00049387553,0.00017805776,0.0000039463885],"about_ca_topic_score_codex":0.0089412,"about_ca_topic_score_gemma":0.0050546285,"teacher_disagreement_score":0.0089412,"about_ca_system_score_codex":0.00070512766,"about_ca_system_score_gemma":0.00067516655,"threshold_uncertainty_score":0.017778337},"labels":[],"label_agreement":null},{"id":"W4407029533","doi":"10.1016/j.epsr.2025.111451","title":"Peer-to-peer energy management of distributed ledgers in renewable smart energy systems","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Peer-to-peer; Distributed generation; Distributed ledger; Distributed computing; Energy management; Computer science; Ledger; Environmental economics; Energy (signal processing); Business; Computer security; Electrical engineering; Blockchain; Engineering; Economics; Physics; Accounting","score_opus":0.016049710418721514,"score_gpt":0.2750524720702631,"score_spread":0.2590027616515416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407029533","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40996313,0.0016123618,0.56570876,0.0009524764,0.0005062178,0.00035180108,0.00015198879,0.0015310994,0.019222202],"genre_scores_gemma":[0.989268,0.000110023466,0.008348811,0.000033027096,0.00004608198,0.000022721219,0.00003345187,0.00003407198,0.0021037112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994118,0.00017424447,0.00003314489,0.00016312698,0.00013711056,0.00008061559],"domain_scores_gemma":[0.99903274,0.0004851459,0.00006181809,0.00010268834,0.00024502422,0.00007266737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008606001,0.00045135067,0.0011065012,0.00027746535,0.0009592679,0.0012112838,0.0014801042,0.0008329545,0.0028248793],"category_scores_gemma":[0.0024005806,0.00022463559,0.00023990245,0.00036944152,0.00040692944,0.0017735477,0.0009502324,0.0005516578,0.0005412612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009859431,0.000575804,0.0028650668,0.00038739032,0.00013696475,0.000692488,0.0007075978,0.6343412,0.023413708,0.02314379,0.008722556,0.3040275],"study_design_scores_gemma":[0.00002510093,0.00014710304,0.0006527568,0.000010625777,0.000024028643,0.000103440616,0.00024050273,0.97841156,0.005251568,0.012552757,0.0025621047,0.000018372237],"about_ca_topic_score_codex":0.0013630326,"about_ca_topic_score_gemma":0.0028974006,"teacher_disagreement_score":0.0028248793,"about_ca_system_score_codex":0.0003902492,"about_ca_system_score_gemma":0.0003894466,"threshold_uncertainty_score":0.009450138},"labels":[],"label_agreement":null},{"id":"W4407264202","doi":"10.1016/j.energy.2025.134778","title":"Risk-aware distributed chance constrained energy coordination in energy communities","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Université du Québec à Trois-Rivières","keywords":"Energy (signal processing); Distributed generation; Computer science; Business; Environmental economics; Risk analysis (engineering); Engineering; Renewable energy; Economics; Physics; Electrical engineering","score_opus":0.004930994020926434,"score_gpt":0.1884949708451289,"score_spread":0.18356397682420247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407264202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.080932476,0.0003641619,0.91206914,0.0005052275,0.00009372166,0.00009501226,0.0000955275,0.0002617747,0.0055828467],"genre_scores_gemma":[0.9792637,0.00007346351,0.018822895,0.00004380381,0.000031538908,0.000034410547,0.000041933716,0.000029107727,0.0016590486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837804,0.0005782994,0.00006693772,0.00036886914,0.00032465038,0.00028316857],"domain_scores_gemma":[0.9963368,0.002164219,0.00044245447,0.00027602873,0.0004155958,0.00036488698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024852634,0.00071861263,0.001793833,0.0005389192,0.0008254714,0.0022045854,0.0020804408,0.0013691076,0.002709344],"category_scores_gemma":[0.008024821,0.0006066421,0.0006081707,0.0008445627,0.0009578235,0.0023804756,0.0029958126,0.0011614485,0.00026034648],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015809709,0.0000682588,0.0010459035,0.00004178008,0.000058825255,0.00010620353,0.00008458987,0.95987546,0.0007211313,0.021414395,0.0009060177,0.015519247],"study_design_scores_gemma":[0.0000073710867,0.000022636355,0.00012720443,0.000003747131,0.0000073405295,0.000020549754,0.000026496326,0.98647213,0.00014291193,0.01293747,0.00022738405,0.000004743069],"about_ca_topic_score_codex":0.0033293033,"about_ca_topic_score_gemma":0.004194409,"teacher_disagreement_score":0.0033293033,"about_ca_system_score_codex":0.0011033635,"about_ca_system_score_gemma":0.0012883001,"threshold_uncertainty_score":0.01314348},"labels":[],"label_agreement":null},{"id":"W4407275037","doi":"10.1016/j.enbuild.2025.115404","title":"A two-stage probabilistic flexibility management model for aggregated residential buildings","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Marie Sklodowska-Curie Actions; Fundação para a Ciência e a Tecnologia; Canadian Thoracic Society","keywords":"Flexibility (engineering); Probabilistic logic; Stage (stratigraphy); Architectural engineering; Computer science; Environmental science; Engineering; Mathematics; Artificial intelligence; Statistics","score_opus":0.011160086688383104,"score_gpt":0.2394966996272611,"score_spread":0.228336612938878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407275037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1217092,0.0004699355,0.85736924,0.0007568164,0.000086266984,0.00015285145,0.0008673328,0.0006626527,0.017925637],"genre_scores_gemma":[0.9782161,0.00014935712,0.012208683,0.00004501147,0.000023983164,0.00009143105,0.00018856343,0.000043369007,0.009033371],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927896,0.00021808776,0.00002917495,0.00016835649,0.00012566091,0.00017971055],"domain_scores_gemma":[0.9993892,0.00031067448,0.00008079494,0.00004368739,0.00011395717,0.00006163449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011778813,0.0008156566,0.0014382038,0.00047636192,0.0006456068,0.0016756568,0.0029852167,0.0018841944,0.0074353586],"category_scores_gemma":[0.0016985913,0.00092964625,0.0011981678,0.00082122383,0.0008094716,0.0017058061,0.0011962228,0.0011879881,0.00057193596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026815234,0.0000094293855,0.00011852328,0.000010201743,0.000007202398,0.000025398323,0.000013896072,0.9950954,0.00018788669,0.0030490027,0.000119336735,0.0013368706],"study_design_scores_gemma":[0.0000032664307,0.0000075116045,0.000049028455,0.0000012827833,0.000003894658,0.0000039853107,0.0000029944308,0.9989662,0.000037568916,0.0008536599,0.00006770885,0.0000029421083],"about_ca_topic_score_codex":0.023371985,"about_ca_topic_score_gemma":0.017319886,"teacher_disagreement_score":0.023371985,"about_ca_system_score_codex":0.0017994009,"about_ca_system_score_gemma":0.0012429843,"threshold_uncertainty_score":0.046471894},"labels":[],"label_agreement":null},{"id":"W4407317635","doi":"10.1016/j.biortech.2025.132210","title":"Bayesian Optimization-Enhanced Reinforcement learning for Self-adaptive and multi-objective control of wastewater treatment","year":2025,"lang":"en","type":"article","venue":"Bioresource Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Outstanding Youth Science Fund Project of National Natural Science Foundation of China; National Natural Science Foundation of China","keywords":"Reinforcement learning; Sewage treatment; Process (computing); Wastewater; Computer science; Control (management); Activated sludge; Engineering; Environmental engineering; Artificial intelligence","score_opus":0.0047168758087401605,"score_gpt":0.2002777553081162,"score_spread":0.19556087949937603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407317635","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04468322,0.0004546982,0.9517438,0.00018790274,0.00004308228,0.000049856262,0.000015834312,0.00030098963,0.0025206262],"genre_scores_gemma":[0.9537077,0.00013913453,0.044981953,0.00006715855,0.000019509167,0.000074844866,0.000024226194,0.00002559489,0.00095982815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996201,0.00014292644,0.000017878358,0.00004879523,0.0001240997,0.0000461932],"domain_scores_gemma":[0.99932694,0.00037687467,0.000098802426,0.000027253194,0.00014089729,0.000029268122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011440727,0.00055187684,0.00062574196,0.00028572953,0.00019216098,0.00043560087,0.0006271211,0.0005875239,0.0006208793],"category_scores_gemma":[0.00211279,0.00033232596,0.00036509664,0.000180192,0.00053135975,0.00043151405,0.0005569822,0.0008430917,0.000133332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037334397,0.000048703117,0.0002720961,0.00003389197,0.000024587074,0.000016843407,0.0000158818,0.9758613,0.0025878975,0.0019005763,0.00015423095,0.019046675],"study_design_scores_gemma":[0.0000046975592,0.000019497098,0.000044342338,0.0000013530429,0.0000019427373,0.0000016011123,6.525215e-7,0.99926263,0.00025865092,0.0003327354,0.00007022882,0.0000017771272],"about_ca_topic_score_codex":0.004920953,"about_ca_topic_score_gemma":0.0044756127,"teacher_disagreement_score":0.004920953,"about_ca_system_score_codex":0.00063461787,"about_ca_system_score_gemma":0.0008624179,"threshold_uncertainty_score":0.009784639},"labels":[],"label_agreement":null},{"id":"W4407360884","doi":"10.1109/isgteurope62998.2024.10863272","title":"Droop Control of Heat Pumps in Integrated Electricity and District Heating Systems in Remote Community Microgrids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Voltage droop; Electricity; Environmental science; Microgrid; Control (management); Heat pump; Distributed power generation; Heating system; Automotive engineering; Computer science; Electrical engineering; Distributed generation; Engineering; Mechanical engineering; Voltage; Renewable energy; Voltage regulator","score_opus":0.007885275336583756,"score_gpt":0.20523748671905015,"score_spread":0.1973522113824664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407360884","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3374159,0.0005168502,0.6415532,0.00018440543,0.00012523752,0.00021198599,0.00009044243,0.0011036737,0.018798232],"genre_scores_gemma":[0.9954666,0.00005070583,0.003681377,0.000010804938,0.000009736939,0.000019147452,0.000012289011,0.0000075844523,0.00074167055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998473,0.000034015295,0.000008973411,0.000043302236,0.00004782509,0.00001861282],"domain_scores_gemma":[0.9998449,0.000050425453,0.00003661176,0.000014683659,0.00003998709,0.000013389835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022832982,0.0004515105,0.00024094064,0.00016247995,0.0002666456,0.0005549991,0.00046338871,0.00017450622,0.0013521713],"category_scores_gemma":[0.0004338523,0.00012235974,0.00021364479,0.00011459434,0.0002964677,0.00031663576,0.00044892714,0.00035741623,0.00016043747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006627508,0.00032206773,0.003007817,0.00034876718,0.00012738493,0.00047133103,0.0005392241,0.72685593,0.084081255,0.007834013,0.0018954948,0.17385389],"study_design_scores_gemma":[0.000046821162,0.00028503133,0.0013505827,0.00001585784,0.000027698032,0.000068099966,0.00006276385,0.9859482,0.0084613105,0.0012597173,0.0024593042,0.000014644498],"about_ca_topic_score_codex":0.002489757,"about_ca_topic_score_gemma":0.0033282042,"teacher_disagreement_score":0.002489757,"about_ca_system_score_codex":0.00019053393,"about_ca_system_score_gemma":0.00022468956,"threshold_uncertainty_score":0.0049505234},"labels":[],"label_agreement":null},{"id":"W4407376241","doi":"10.1109/isgteurope62998.2024.10863766","title":"From Hourly to Quarter-Hourly: Effects of Metering Intervals on Self-Consumption Ratios and Economic Viability of Solar Photovoltaic Systems in Finnish Residential Buildings","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Metering mode; Quarter (Canadian coin); Net metering; Consumption (sociology); Environmental science; Automotive engineering; Engineering; Meteorology; Environmental economics; Architectural engineering; Electrical engineering; Renewable energy; Economics; Geography; Distributed generation; Mechanical engineering","score_opus":0.0059090106950199705,"score_gpt":0.21241282143083443,"score_spread":0.20650381073581445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407376241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9993206,0.000052458083,0.00009860282,0.000013017774,0.0000024353096,0.0000022671281,0.00006276943,0.0000033540575,0.0004445043],"genre_scores_gemma":[0.99975985,0.000020949068,0.000063027,0.000004510851,0.0000012858903,0.0000024042413,0.000070024886,0.0000017723198,0.00007612853],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989681,0.00042364787,0.000060494393,0.00014712234,0.00025173498,0.00014882591],"domain_scores_gemma":[0.9929046,0.005330263,0.00086669915,0.00029436406,0.00037227187,0.00023187193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012176016,0.00026194195,0.00022950562,0.0003319577,0.00023419499,0.0010456727,0.00042063274,0.00035338942,0.0012321597],"category_scores_gemma":[0.005329834,0.00016021749,0.0006245358,0.00061091426,0.0004500613,0.0005942511,0.00051002624,0.00045596808,0.00017693569],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023730027,0.000492864,0.9095896,0.0001486073,0.0003620853,0.00076629815,0.0025180376,0.043802258,0.008675188,0.0005559241,0.0003851084,0.030331101],"study_design_scores_gemma":[0.000008248789,0.00055186235,0.98614013,0.000012130091,0.000078957426,0.0000806236,0.0018268306,0.008296686,0.0023855874,0.0001809204,0.00041688967,0.00002108639],"about_ca_topic_score_codex":0.00921738,"about_ca_topic_score_gemma":0.009974078,"teacher_disagreement_score":0.00921738,"about_ca_system_score_codex":0.00078101957,"about_ca_system_score_gemma":0.0003111606,"threshold_uncertainty_score":0.018327475},"labels":[],"label_agreement":null},{"id":"W4407378630","doi":"10.1109/isgteurope62998.2024.10863604","title":"Equitable Distribution of Community Energy Resources for Underprivileged Households","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Université Laval","funders":"","keywords":"Distribution (mathematics); Energy (signal processing); Computer science; Socioeconomics; Economics; Mathematics; Statistics","score_opus":0.020641382043484587,"score_gpt":0.22493100034817523,"score_spread":0.20428961830469064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407378630","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57546896,0.0003123932,0.4087558,0.0005487267,0.000037510235,0.00022309083,0.00011820788,0.00021106383,0.014324205],"genre_scores_gemma":[0.9867191,0.00007911552,0.011846513,0.000025923606,0.0000067156793,0.00003150821,0.000021246815,0.000017909948,0.0012520138],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796057,0.0009817883,0.00005829523,0.00017654375,0.00046002548,0.00036272238],"domain_scores_gemma":[0.9966788,0.0016506312,0.00048260277,0.0004752188,0.00054430065,0.00016847873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003599503,0.00047774363,0.0007121592,0.00063918746,0.0009334544,0.0015964502,0.0010515503,0.0006448851,0.002461934],"category_scores_gemma":[0.008737736,0.0001949605,0.00027163097,0.0008370426,0.00064729055,0.0020630234,0.0019413392,0.00055881805,0.00024315517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005744277,0.00040625874,0.0065594255,0.00013488604,0.00005941988,0.000301255,0.0003278989,0.8360263,0.006456146,0.033373665,0.0013855232,0.11439483],"study_design_scores_gemma":[0.0000366843,0.00018000664,0.0018538374,0.000019647867,0.000017954399,0.00011413691,0.0003805284,0.9708076,0.004170671,0.020939888,0.001458704,0.00002022311],"about_ca_topic_score_codex":0.0032619236,"about_ca_topic_score_gemma":0.0050716405,"teacher_disagreement_score":0.003599503,"about_ca_system_score_codex":0.0010011218,"about_ca_system_score_gemma":0.0012149191,"threshold_uncertainty_score":0.019036233},"labels":[],"label_agreement":null},{"id":"W4407572722","doi":"10.1002/9781394191529.ch22","title":"Transactive Energy Management and Distribution System Reform Using Market Concepts","year":2025,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Ontario Power Generation","funders":"","keywords":"Transactive memory; Business; Distribution (mathematics); Environmental economics; Computer science; Process management; Knowledge management; Economics; Mathematics","score_opus":0.004018220875900182,"score_gpt":0.19100951048607973,"score_spread":0.18699128961017955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407572722","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014548519,0.0012923077,0.8764427,0.003505994,0.00017066704,0.00018115078,0.000096562435,0.00014710972,0.10361505],"genre_scores_gemma":[0.8727013,0.001808645,0.09069972,0.0005038827,0.00024138461,0.0004726609,0.000055103075,0.000081831146,0.033435594],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99895006,0.0004530832,0.00003549996,0.00021458193,0.00024395707,0.000102834776],"domain_scores_gemma":[0.99953663,0.00018818464,0.000074457545,0.000050009407,0.000090082634,0.00006064698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016144633,0.00095382886,0.0005043381,0.0005877354,0.0007975625,0.0038520175,0.0015212768,0.0018595116,0.0092500225],"category_scores_gemma":[0.0018226521,0.00037963837,0.0009167874,0.0006946702,0.002332901,0.005335054,0.003016882,0.0022804823,0.0005312387],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018587822,0.00003616825,0.00009258083,0.000055141212,0.000016945722,0.00010456223,0.000120710174,0.08596738,0.0005760669,0.90074706,0.001202921,0.011061861],"study_design_scores_gemma":[0.000045817113,0.00008286349,0.00014112637,0.00007008804,0.000017745047,0.00012105152,0.00022240367,0.43708077,0.0005651942,0.5364703,0.025158454,0.000024230189],"about_ca_topic_score_codex":0.0022419132,"about_ca_topic_score_gemma":0.00275706,"teacher_disagreement_score":0.0092500225,"about_ca_system_score_codex":0.0027069012,"about_ca_system_score_gemma":0.0018477049,"threshold_uncertainty_score":0.030944407},"labels":[],"label_agreement":null},{"id":"W4407694919","doi":"10.3998/mpub.14606494","title":"Drift Net","year":2025,"lang":"en","type":"book","venue":"Lever Press eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Warwick; Princeton University; University of Minnesota; University of Alberta; West Virginia University; Harvard University","keywords":"Geography; Computer science; Environmental science","score_opus":0.013858816562564411,"score_gpt":0.19175292272303449,"score_spread":0.17789410616047008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407694919","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012924368,0.0016136528,0.0053352946,0.0056718164,0.0035046458,0.00018137587,0.004916576,0.0035646565,0.9739196],"genre_scores_gemma":[0.010592595,0.001826895,0.004472712,0.002589553,0.0005499799,0.0002726572,0.004480662,0.002290911,0.972924],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980234,0.00036414864,0.00012809153,0.00042892096,0.000845892,0.00020957174],"domain_scores_gemma":[0.9965976,0.0007400558,0.00020492189,0.00061334827,0.0009823428,0.0008617247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017565441,0.00082326215,0.0006251071,0.0024142428,0.0025225326,0.009631447,0.0022285043,0.0028865929,0.6722878],"category_scores_gemma":[0.006783478,0.00052591355,0.00062150654,0.0022369619,0.0013422264,0.0057439143,0.0054213563,0.0022545722,0.44384155],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014467619,0.000067839086,0.00060766184,0.0005050692,0.000008105562,0.000259522,0.00071337016,0.00023253389,0.0005318121,0.07246142,0.68648064,0.23798734],"study_design_scores_gemma":[0.0000086206455,0.00001046919,0.00016426106,0.00013305577,0.0000015705889,0.00010109374,0.00016929016,0.000101226586,0.00012268596,0.0053193513,0.9938617,0.0000066771013],"about_ca_topic_score_codex":0.0024862753,"about_ca_topic_score_gemma":0.0048535904,"teacher_disagreement_score":0.6722878,"about_ca_system_score_codex":0.0022993302,"about_ca_system_score_gemma":0.0046477737,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4407736601","doi":"10.1109/access.2025.3543760","title":"Adaptive Pricing-Based Optimized Resource Utilization in Networked Microgrids","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Electric System Operator","keywords":"Computer science; Resource management (computing); Environmental economics; Computer network; Resource (disambiguation); Distributed computing","score_opus":0.02740583594214211,"score_gpt":0.27073192283162295,"score_spread":0.24332608688948085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407736601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20708676,0.00037917422,0.77935296,0.00026140935,0.00007202262,0.00008049461,0.00007969715,0.00041072065,0.012276749],"genre_scores_gemma":[0.98845184,0.00004695765,0.010904661,0.000014673007,0.000008206733,0.000018860917,0.000014629831,0.00001586712,0.00052419276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997019,0.000101919446,0.000013191237,0.000052765146,0.00007225634,0.00005787044],"domain_scores_gemma":[0.99980015,0.000074460055,0.000042929318,0.000023709043,0.000038344435,0.000020383617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061240257,0.00043056038,0.00054113794,0.00022627057,0.00027524054,0.0006450603,0.0007418331,0.00028696103,0.0010766571],"category_scores_gemma":[0.0011588609,0.00021886097,0.00025092685,0.00036012675,0.0004597746,0.000848242,0.00062597997,0.00039758073,0.00011385087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031157968,0.000020451283,0.0003501608,0.000014798473,0.000014567209,0.000038350947,0.000020707419,0.9821618,0.0010226471,0.004380275,0.00028468075,0.011660367],"study_design_scores_gemma":[0.000004122287,0.00001082591,0.00008688338,0.0000010008382,0.0000026525936,0.000005358703,0.000007787356,0.9977908,0.00019244548,0.001781348,0.00011497058,0.0000018953815],"about_ca_topic_score_codex":0.0039061625,"about_ca_topic_score_gemma":0.004052176,"teacher_disagreement_score":0.0039061625,"about_ca_system_score_codex":0.00076392974,"about_ca_system_score_gemma":0.0006610797,"threshold_uncertainty_score":0.007766843},"labels":[],"label_agreement":null},{"id":"W4407737064","doi":"10.1109/eesat62935.2025.10891235","title":"Field Data-Driven Discrete-Event Simulation of Residential PV/ Energy Storage Systems in Cold Climate Regions","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); National Research Council Canada","funders":"","keywords":"Photovoltaic system; Discrete event simulation; Environmental science; Computer science; Field (mathematics); Transient climate simulation; Event (particle physics); Climate change; Meteorology; Climate model; Simulation; Engineering; Geography; Electrical engineering; Physics; Geology","score_opus":0.014640252448782903,"score_gpt":0.25821208530460993,"score_spread":0.24357183285582704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407737064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93461055,0.00009953184,0.046473417,0.00040919153,0.00007069417,0.00018853882,0.0024045738,0.0004697838,0.015273722],"genre_scores_gemma":[0.994928,0.000031850974,0.0030349966,0.000031288764,0.0000038667595,0.000059767757,0.00046136518,0.000012480624,0.0014362583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981564,0.00005893564,0.000011816277,0.000037131907,0.00003577069,0.000040808656],"domain_scores_gemma":[0.9991689,0.0005127456,0.000068367415,0.000045980763,0.00013381273,0.00007030861],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005066741,0.0004452144,0.00054803584,0.00037685156,0.00042200997,0.00071256683,0.00077013246,0.00081499433,0.0025063227],"category_scores_gemma":[0.001158766,0.00029435707,0.00049037125,0.00047526593,0.0005124217,0.0005018249,0.00040096603,0.0007596539,0.0001864619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040356947,0.00005506159,0.0013085261,0.000011122732,0.000006094661,0.000024636509,0.000011198108,0.99705875,0.00025199456,0.00043305644,0.0001372223,0.0006620259],"study_design_scores_gemma":[0.000013744853,0.000017514356,0.0003393401,0.000001045577,0.0000016338046,0.0000019093115,0.000012909055,0.99923086,0.00014549734,0.00014833108,0.000084573265,0.0000026461717],"about_ca_topic_score_codex":0.040361144,"about_ca_topic_score_gemma":0.023173066,"teacher_disagreement_score":0.040361144,"about_ca_system_score_codex":0.0010023486,"about_ca_system_score_gemma":0.00081547245,"threshold_uncertainty_score":0.08025241},"labels":[],"label_agreement":null},{"id":"W4407752843","doi":"10.2139/ssrn.5144493","title":"Integrating Energy Modeling and Decision-Making for Optimizing Sustainable Off-Grid Education Via Hybrid Systems","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Sustainable energy; Grid; Computer science; Energy (signal processing); Energy system; Environmental economics; Systems engineering; Renewable energy; Engineering; Electrical engineering; Geography; Economics; Mathematics","score_opus":0.0045052473735288905,"score_gpt":0.22838747048772337,"score_spread":0.22388222311419448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407752843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089464724,0.0004264876,0.8888228,0.0010819519,0.00010033255,0.00009732693,0.00015936814,0.00039231413,0.019454654],"genre_scores_gemma":[0.97592825,0.00014556354,0.021500949,0.000060034934,0.000022027165,0.000052467727,0.000053380856,0.000032927284,0.0022043516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995128,0.00022572317,0.0000170432,0.00007246914,0.00011016018,0.00006174071],"domain_scores_gemma":[0.99920136,0.0005680147,0.00005565695,0.00003881241,0.0001019381,0.000034219116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008998013,0.00073804654,0.0010142946,0.00044344564,0.00040219218,0.0024839148,0.00076979044,0.0011303896,0.003962801],"category_scores_gemma":[0.0020015398,0.0005008376,0.0006078902,0.00074729766,0.00054164574,0.0020439774,0.0012346214,0.0011231578,0.00034548485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041603966,0.00006401662,0.00043960757,0.00003013639,0.000031753814,0.00001845443,0.000021679181,0.98032403,0.0003952363,0.006489715,0.0002023467,0.011941446],"study_design_scores_gemma":[0.0000057302036,0.000015600508,0.000100555786,0.000005481943,0.0000066119114,0.0000025532597,0.000014824087,0.9933976,0.00022913984,0.0060103447,0.00020731248,0.00000421351],"about_ca_topic_score_codex":0.009142849,"about_ca_topic_score_gemma":0.009054006,"teacher_disagreement_score":0.009142849,"about_ca_system_score_codex":0.0009951551,"about_ca_system_score_gemma":0.0011481517,"threshold_uncertainty_score":0.018179238},"labels":[],"label_agreement":null},{"id":"W4407758877","doi":"10.1016/j.epsr.2025.111526","title":"Distributed continuous-time unit commitment with energy storage in multi-area networks","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Unit (ring theory); Energy storage; Distributed generation; Power system simulation; Energy (signal processing); Computer science; Environmental science; Electrical engineering; Engineering; Renewable energy; Power (physics); Electric power system; Physics; Mathematics","score_opus":0.020487042509013197,"score_gpt":0.264112542190162,"score_spread":0.2436254996811488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407758877","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13159831,0.0010693967,0.85943496,0.00059540453,0.0003182239,0.00009458391,0.0001806794,0.0005267479,0.0061816135],"genre_scores_gemma":[0.9821416,0.00009881467,0.016252501,0.000032347336,0.00003546495,0.000041240506,0.00003804054,0.000018593482,0.0013414115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992919,0.00029609984,0.0000425167,0.00016518706,0.00012471541,0.000079563266],"domain_scores_gemma":[0.9982084,0.001203483,0.000120576726,0.00017807547,0.00020945272,0.00008001392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013067991,0.0006249213,0.0012598411,0.00026449445,0.00053086487,0.0012315231,0.0015176444,0.00078290404,0.0023086667],"category_scores_gemma":[0.0029631217,0.00048246808,0.00036256743,0.00078438,0.0007077388,0.0016103343,0.0007717454,0.0011481433,0.00020222583],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026657587,0.00005378265,0.00023423693,0.000056341967,0.000035944522,0.000059233236,0.000025714251,0.9705117,0.00085377606,0.0044173184,0.00060470466,0.022880703],"study_design_scores_gemma":[0.000011491871,0.000014763161,0.000039348273,0.0000016630206,0.0000036048152,0.000006764768,0.000003829537,0.9979825,0.00016059092,0.0017075232,0.00006582026,0.0000020261293],"about_ca_topic_score_codex":0.0037689034,"about_ca_topic_score_gemma":0.005371279,"teacher_disagreement_score":0.0037689034,"about_ca_system_score_codex":0.00072332495,"about_ca_system_score_gemma":0.00074928685,"threshold_uncertainty_score":0.007723272},"labels":[],"label_agreement":null},{"id":"W4407832187","doi":"10.1109/gridedge61154.2025.10887411","title":"Preventing Arbitrage to Enable Preferences in Distributed Peer-to-Peer Electricity Trading","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Arbitrage; Peer-to-peer; Electricity; Computer science; Business; Distributed computing; Finance; Electrical engineering; Engineering","score_opus":0.010300448271044692,"score_gpt":0.22797607487194718,"score_spread":0.21767562660090248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407832187","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03226487,0.00017633013,0.96159315,0.00041749104,0.00008109758,0.00009188403,0.000026427242,0.00008511478,0.0052636275],"genre_scores_gemma":[0.91371816,0.00014813141,0.08227573,0.0001503349,0.00007920718,0.00015938123,0.000023496248,0.0000476729,0.003397833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99677783,0.001574153,0.00017673588,0.0004769453,0.00068785856,0.0003065458],"domain_scores_gemma":[0.99484986,0.0033471298,0.00044292625,0.0007064158,0.0004114565,0.0002421704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004005354,0.0006430789,0.001147066,0.00023053924,0.00092688453,0.0017760965,0.0020522303,0.0018223042,0.004328998],"category_scores_gemma":[0.01164352,0.00045119022,0.00081406755,0.0004929573,0.0018472272,0.0041387845,0.00347851,0.0026432942,0.0003823739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035399085,0.00021247372,0.00060240744,0.00019317817,0.000104458326,0.00072676816,0.00043645198,0.5613939,0.006653201,0.38546923,0.0017562825,0.04209763],"study_design_scores_gemma":[0.00008092363,0.00012460483,0.00009867654,0.000016812606,0.000021980431,0.00015266774,0.00007936539,0.82034963,0.0014601734,0.1746211,0.002968655,0.000025382285],"about_ca_topic_score_codex":0.0005878922,"about_ca_topic_score_gemma":0.0007940241,"teacher_disagreement_score":0.004328998,"about_ca_system_score_codex":0.00047883985,"about_ca_system_score_gemma":0.001057764,"threshold_uncertainty_score":0.021182597},"labels":[],"label_agreement":null},{"id":"W4407852413","doi":"10.1016/j.energy.2025.135223","title":"Monthly and quarter-hourly hydro scheduling for assessing retrofit of conventional to reversible turbines with wind and PV integration","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental science; Wind power; Quarter (Canadian coin); Photovoltaic system; Marine engineering; Meteorology; Automotive engineering; Engineering; Electrical engineering; Geography","score_opus":0.006445165013631066,"score_gpt":0.2136443017629942,"score_spread":0.20719913674936313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407852413","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.996262,0.000011304957,0.0019653009,0.000012346872,0.000009426343,0.000018519513,0.0006874062,0.00007746459,0.0009562531],"genre_scores_gemma":[0.99836,0.0000054521406,0.0011051869,0.000002608119,0.0000022395031,0.000005963909,0.00031477958,0.0000062999666,0.00019748908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998265,0.000055270284,0.00001138907,0.00003512861,0.000051140647,0.000020556632],"domain_scores_gemma":[0.9991129,0.00035845515,0.00012760457,0.00006515186,0.00018365738,0.00015226429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045912951,0.00030692795,0.00032368698,0.00063806085,0.00021297627,0.0003460906,0.00028930482,0.00034763466,0.0011996747],"category_scores_gemma":[0.001067104,0.00014126406,0.00024245096,0.00054890546,0.000109429464,0.00032961808,0.00014619424,0.00024421836,0.0002006767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038035498,0.0011810934,0.37419003,0.00012545216,0.00026636524,0.00036703146,0.00021606925,0.53182906,0.02492548,0.0008549659,0.0024662064,0.059774615],"study_design_scores_gemma":[0.00005886304,0.0012211533,0.3109233,0.000006057188,0.00005277802,0.000101718535,0.00023851675,0.68120575,0.0052581187,0.00035631435,0.00055058545,0.000026815153],"about_ca_topic_score_codex":0.0067148805,"about_ca_topic_score_gemma":0.012957171,"teacher_disagreement_score":0.0067148805,"about_ca_system_score_codex":0.00030776535,"about_ca_system_score_gemma":0.00028884097,"threshold_uncertainty_score":0.013351619},"labels":[],"label_agreement":null},{"id":"W4407919307","doi":"10.1016/j.procs.2025.01.335","title":"Innovative Swing Mechanism for Sustainable Energy Generation: Design, Performance, and IoT Integration","year":2025,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"NSCAD University","funders":"","keywords":"Computer science; Swing; Mechanism (biology); Internet of Things; Energy (signal processing); Mechanism design; Sustainable energy; Embedded system; Computer architecture; Industrial engineering; Renewable energy; Electrical engineering; Mechanical engineering","score_opus":0.011873954586898883,"score_gpt":0.2067400369826292,"score_spread":0.1948660823957303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407919307","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56096125,0.0016068924,0.41928527,0.00040342353,0.00028406447,0.00028230512,0.00028020638,0.0010756945,0.015820947],"genre_scores_gemma":[0.96279186,0.00035643327,0.033159867,0.00003463053,0.000019710891,0.000072680734,0.00009741166,0.000032393153,0.0034349668],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998288,0.000017465021,0.0000114104705,0.000024489518,0.00009595453,0.000021845628],"domain_scores_gemma":[0.9998683,0.000017476374,0.000023038825,0.000016402135,0.000059044112,0.00001586867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027311558,0.0003440747,0.00021266825,0.00054195867,0.00019470356,0.00038003703,0.00046648085,0.0004025877,0.0017431928],"category_scores_gemma":[0.0003047998,0.00013685106,0.00029841787,0.00036773432,0.00018642422,0.0005965059,0.00032612006,0.00017252352,0.00041230948],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003326746,0.000117592346,0.0030977752,0.0006298898,0.00003685996,0.0004562624,0.0001565335,0.012664242,0.86527354,0.0075250207,0.0013078484,0.10840182],"study_design_scores_gemma":[0.00017706456,0.006836869,0.022347162,0.00018919597,0.00022370445,0.0024575973,0.0004849508,0.22012582,0.65572727,0.0073216558,0.08396152,0.00014722713],"about_ca_topic_score_codex":0.0001237463,"about_ca_topic_score_gemma":0.00030030755,"teacher_disagreement_score":0.0017431928,"about_ca_system_score_codex":0.00014175534,"about_ca_system_score_gemma":0.00018626767,"threshold_uncertainty_score":0.0058315992},"labels":[],"label_agreement":null},{"id":"W4407920272","doi":"10.1007/978-3-031-80817-3_5","title":"Machine Learning Algorithms for Energy Consumption Prediction in Smart Homes: A Comparative Study","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes on data engineering and communications technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Energy consumption; Energy (signal processing); Algorithm; Machine learning; Artificial intelligence; Engineering; Mathematics; Statistics; Electrical engineering","score_opus":0.055684494199324405,"score_gpt":0.2701506056157278,"score_spread":0.21446611141640337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407920272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69345385,0.049541503,0.21780418,0.0019955027,0.00053541485,0.00012158298,0.0008595792,0.0009789012,0.034709483],"genre_scores_gemma":[0.94245034,0.010207104,0.041428123,0.0001166751,0.00013219798,0.000040793097,0.0008343477,0.00008378585,0.0047065765],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832994,0.0008656563,0.00007719558,0.0001945559,0.0004394042,0.00009325641],"domain_scores_gemma":[0.97850627,0.01926006,0.00027127302,0.00048820014,0.0013787473,0.00009542851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004206774,0.000649736,0.00089763786,0.0014679017,0.0003188225,0.0013450256,0.00096386403,0.0009294239,0.002306007],"category_scores_gemma":[0.011282785,0.00015481605,0.0005976127,0.00279607,0.00037547294,0.002421347,0.00034632196,0.00084869313,0.00049314386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012864412,0.00075978506,0.028125241,0.0005135205,0.0003019194,0.000055936784,0.00018898139,0.2846582,0.0003437423,0.008076251,0.0049884547,0.6707015],"study_design_scores_gemma":[0.000033067925,0.00033992933,0.014575144,0.00010726277,0.00012048944,0.00006437297,0.00032541304,0.9753004,0.0012098451,0.0049834508,0.0029174248,0.000023343713],"about_ca_topic_score_codex":0.009332888,"about_ca_topic_score_gemma":0.0049357787,"teacher_disagreement_score":0.009332888,"about_ca_system_score_codex":0.0010768479,"about_ca_system_score_gemma":0.00062163273,"threshold_uncertainty_score":0.02224785},"labels":[],"label_agreement":null},{"id":"W4408024161","doi":"10.1049/icp.2024.4704","title":"Data-driven power demand disaggregation to the substation level","year":2025,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Power (physics); Power demand; Environmental science; Power consumption; Physics","score_opus":0.04362958855429583,"score_gpt":0.2615304221945298,"score_spread":0.217900833640234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408024161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1862521,0.000121573576,0.7881336,0.00031748455,0.000082596074,0.0002076443,0.013800479,0.0022379353,0.008846624],"genre_scores_gemma":[0.8497482,0.00010718623,0.13536353,0.00005823109,0.000035892725,0.00012959373,0.012370231,0.00019593332,0.0019912475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968076,0.000071740054,0.000024993564,0.0000848591,0.00010554503,0.000032046188],"domain_scores_gemma":[0.99891186,0.00026413493,0.00012396104,0.00035422735,0.00031049942,0.000035431367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038790025,0.00050660624,0.0005163752,0.0007713281,0.00024435532,0.00088861614,0.0004040961,0.00022226076,0.0021578162],"category_scores_gemma":[0.0026765116,0.000260492,0.00037944477,0.001759126,0.00012668352,0.00089658774,0.0006979004,0.00063664,0.0007027924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002077325,0.00018123884,0.05127129,0.00024384607,0.0001702419,0.00017540358,0.0005265568,0.6660224,0.009637826,0.013222789,0.011924217,0.24641643],"study_design_scores_gemma":[0.000008781457,0.000025938252,0.015643822,0.00001647926,0.000013895403,0.00004936657,0.00020141032,0.964893,0.003949524,0.007726371,0.0074510104,0.0000204944],"about_ca_topic_score_codex":0.012328305,"about_ca_topic_score_gemma":0.021379903,"teacher_disagreement_score":0.012328305,"about_ca_system_score_codex":0.00054326974,"about_ca_system_score_gemma":0.00050029653,"threshold_uncertainty_score":0.024513066},"labels":[],"label_agreement":null},{"id":"W4408057291","doi":"10.1016/j.apenergy.2025.125562","title":"Maximizing shared benefits in renewable energy communities: A Bilevel optimization model","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Commission for Environmental Cooperation","keywords":"Bilevel optimization; Renewable energy; Environmental economics; Computer science; Business; Environmental science; Mathematical optimization; Economics; Engineering; Optimization problem; Mathematics","score_opus":0.014594501161091986,"score_gpt":0.189697428336329,"score_spread":0.175102927175237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408057291","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11610726,0.00096039346,0.85731536,0.0020418656,0.00012786621,0.00015762575,0.0004425545,0.00021941387,0.022627635],"genre_scores_gemma":[0.9318475,0.00041528212,0.05552078,0.00018959315,0.00008344522,0.0002381426,0.00021091648,0.000117472315,0.011376838],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982515,0.0008520056,0.00005046594,0.0002925005,0.00021772104,0.00033577273],"domain_scores_gemma":[0.99601364,0.0028195684,0.00031607208,0.0001389016,0.00038295274,0.00032886362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002829334,0.0013740328,0.0035591712,0.0011591143,0.001051089,0.004164632,0.0027042364,0.0046584206,0.0064281696],"category_scores_gemma":[0.009137692,0.0014186017,0.0013322694,0.0024818387,0.0018745154,0.0038276752,0.0040356065,0.0025640677,0.00067582773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033029406,0.000031014762,0.00014578996,0.00002992202,0.000025843787,0.000042833482,0.000025723915,0.9852432,0.00006198508,0.011864698,0.00040633237,0.0020896122],"study_design_scores_gemma":[0.000011092866,0.000011564208,0.00002662916,0.000006076325,0.0000058190367,0.0000063546545,0.000019424335,0.98926055,0.000023336604,0.010466324,0.00015918819,0.0000036475253],"about_ca_topic_score_codex":0.008365734,"about_ca_topic_score_gemma":0.0067651616,"teacher_disagreement_score":0.008365734,"about_ca_system_score_codex":0.001949933,"about_ca_system_score_gemma":0.0020009866,"threshold_uncertainty_score":0.021504402},"labels":[],"label_agreement":null},{"id":"W4408281626","doi":"10.1109/iecon55916.2024.10905430","title":"Temporally Chained Equations: An Interpretable Missing Data Imputation Approach for Smart Meters with Low Data Requirements","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Imputation (statistics); Missing data; Computer science; Data mining; Data modeling; Database; Machine learning","score_opus":0.08097792442477686,"score_gpt":0.30022079558931414,"score_spread":0.21924287116453728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408281626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021983646,0.00016302828,0.9965113,0.0002877295,0.000043349406,0.000029400484,0.00029148537,0.00027464688,0.00020072586],"genre_scores_gemma":[0.14407058,0.0008922788,0.8463882,0.0006504762,0.00030076798,0.00036354698,0.0036290546,0.00026899466,0.0034359933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956482,0.00213417,0.00037743984,0.0010303993,0.0005911474,0.00021856712],"domain_scores_gemma":[0.98800105,0.007821405,0.0010438613,0.0013161177,0.0015932391,0.00022438947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007749297,0.001475456,0.0022091148,0.0013590086,0.00065795775,0.0017186317,0.004194212,0.0019847031,0.004131852],"category_scores_gemma":[0.02481075,0.0012432744,0.0026268547,0.0029519254,0.0010080386,0.0038731273,0.0029500143,0.005280858,0.0013524616],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004949659,0.00024240265,0.011563115,0.00046601222,0.0006089369,0.00054574857,0.00075054076,0.63062257,0.0021440007,0.06262522,0.0109139625,0.2790226],"study_design_scores_gemma":[0.000027373064,0.00004581857,0.00041272558,0.00003679404,0.000032643038,0.000047899586,0.000034674213,0.96657103,0.00050264876,0.029755328,0.0025085218,0.000024507424],"about_ca_topic_score_codex":0.008042734,"about_ca_topic_score_gemma":0.012532817,"teacher_disagreement_score":0.008042734,"about_ca_system_score_codex":0.000981644,"about_ca_system_score_gemma":0.0032534373,"threshold_uncertainty_score":0.040982723},"labels":[],"label_agreement":null},{"id":"W4408343532","doi":"10.2139/ssrn.5101465","title":"Towards Sustainable Energy Use: Reinforcement Learning for Demand Response in Commercial Buildings","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; HEC Montréal","funders":"","keywords":"Reinforcement; Demand response; Reinforcement learning; Sustainable energy; Energy (signal processing); Energy demand; Architectural engineering; Environmental economics; Business; Natural resource economics; Computer science; Economics; Engineering; Artificial intelligence; Renewable energy; Electricity; Structural engineering","score_opus":0.007915999871737868,"score_gpt":0.23434786321756707,"score_spread":0.2264318633458292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408343532","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.132301,0.0005963131,0.8579878,0.0016333993,0.000087315275,0.00005638864,0.000056778026,0.00022143741,0.007059576],"genre_scores_gemma":[0.972041,0.00019200979,0.02524396,0.00007072186,0.000034402747,0.000034421486,0.000036536174,0.000034984227,0.0023119512],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996716,0.00019102011,0.000010438603,0.00004329785,0.00004720438,0.000036404504],"domain_scores_gemma":[0.99789524,0.0017233655,0.00008359787,0.000067948204,0.00016079526,0.00006896882],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013568327,0.00040478352,0.00060960435,0.00017572513,0.00020285924,0.0007785469,0.0006135789,0.0008931222,0.0026129594],"category_scores_gemma":[0.005505696,0.00024149768,0.00030024114,0.00028209484,0.0006221466,0.0010978124,0.00083897973,0.0015070445,0.00018610772],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000077529425,0.00007885938,0.00071812293,0.00006084572,0.000027655335,0.000023873652,0.000051223742,0.9539496,0.0005460113,0.012445204,0.0008750563,0.031146092],"study_design_scores_gemma":[0.0000047469794,0.000008711743,0.000060781334,0.000002697221,0.0000017375218,0.0000019106435,0.000006398344,0.99387276,0.00009120461,0.005841166,0.00010669379,0.0000012305678],"about_ca_topic_score_codex":0.006123097,"about_ca_topic_score_gemma":0.004148314,"teacher_disagreement_score":0.006123097,"about_ca_system_score_codex":0.00070007733,"about_ca_system_score_gemma":0.0007764931,"threshold_uncertainty_score":0.012174904},"labels":[],"label_agreement":null},{"id":"W4408358080","doi":"10.1109/tste.2025.3550563","title":"Energy Management of Multi-Energy Communities: A Hierarchical MIQP-Constrained Deep Reinforcement Learning Approach","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reinforcement learning; Energy management; Computer science; Energy (signal processing); Artificial intelligence","score_opus":0.008362335759426905,"score_gpt":0.2064536769525201,"score_spread":0.19809134119309318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408358080","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024467919,0.00024402623,0.97045285,0.00041090787,0.000042663465,0.000054749482,0.00005714014,0.00041139565,0.0038583446],"genre_scores_gemma":[0.9318374,0.00008990675,0.064876385,0.0002585015,0.000037571863,0.00010021419,0.00008578479,0.000055752276,0.0026586084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953926,0.00013384344,0.000016880449,0.0000995067,0.00010914528,0.000101308004],"domain_scores_gemma":[0.99925596,0.00034242138,0.0001010597,0.000048758575,0.0001619124,0.00008995588],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011296759,0.000696613,0.00093052484,0.00031786197,0.00037484334,0.00080852606,0.0018410421,0.0009895397,0.0020719168],"category_scores_gemma":[0.00190886,0.00050099706,0.000428728,0.0003455329,0.0007404664,0.0010299148,0.0015517458,0.0014290184,0.00024727482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002789546,0.000040802857,0.00037299338,0.00002302606,0.000018113135,0.000033721528,0.000022100148,0.980788,0.00045370072,0.00363601,0.00055658276,0.014027054],"study_design_scores_gemma":[0.000002484216,0.0000063241027,0.000017929358,0.0000010429324,0.0000011973813,0.0000018898379,0.0000017342409,0.99913687,0.00004362241,0.00071354257,0.00007237222,9.584652e-7],"about_ca_topic_score_codex":0.010646331,"about_ca_topic_score_gemma":0.011917143,"teacher_disagreement_score":0.010646331,"about_ca_system_score_codex":0.0010817411,"about_ca_system_score_gemma":0.0016971194,"threshold_uncertainty_score":0.021168768},"labels":[],"label_agreement":null},{"id":"W4409102160","doi":"10.1109/access.2025.3556955","title":"Customizable Preference Models for Prosumers in Peer-to-Peer Energy Trading","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Peer-to-peer; Computer science; Preference; Distributed computing; Microeconomics; Economics","score_opus":0.04457695918830155,"score_gpt":0.2782086797052685,"score_spread":0.23363172051696698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409102160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04850681,0.00011583365,0.94726783,0.0002044177,0.00002522353,0.00016170138,0.00013585167,0.00014045335,0.0034418856],"genre_scores_gemma":[0.85853535,0.00014379513,0.13768898,0.000100905985,0.000025234558,0.00025923067,0.00015272529,0.000044952696,0.0030487813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99763286,0.0014045261,0.00010021239,0.00026278757,0.00040109525,0.00019840596],"domain_scores_gemma":[0.997288,0.0016672313,0.00022128054,0.00029119226,0.00039166788,0.00014075523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034421647,0.00088700047,0.0010671217,0.00064120215,0.00056295935,0.001667125,0.0020602292,0.0012135209,0.0033301834],"category_scores_gemma":[0.007356042,0.00060738146,0.0009961406,0.001095787,0.0005921831,0.0025889643,0.001377242,0.0013055358,0.00048829516],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016428094,0.00010478393,0.0016213552,0.00006837709,0.000058963677,0.0001507209,0.0001710542,0.926668,0.0015456959,0.03957502,0.00073352555,0.029138174],"study_design_scores_gemma":[0.000008250198,0.00003248746,0.00013622237,0.0000040443074,0.000007649165,0.000029450632,0.000039127608,0.9878318,0.00019977157,0.011395839,0.00030603068,0.000009400616],"about_ca_topic_score_codex":0.0037184602,"about_ca_topic_score_gemma":0.0067961575,"teacher_disagreement_score":0.0037184602,"about_ca_system_score_codex":0.0011361755,"about_ca_system_score_gemma":0.0010417025,"threshold_uncertainty_score":0.018204153},"labels":[],"label_agreement":null},{"id":"W4409254736","doi":"10.1007/978-3-031-87364-5_20","title":"Efficient and Rapid Optimal Chiller Loading Using a Simplified Two-Stage Algorithm","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario; Toronto Metropolitan University","funders":"","keywords":"Chiller; Stage (stratigraphy); Chiller boiler system; Algorithm; Computer science; Mathematical optimization; Mathematics; Water chiller; Engineering; Physics; Thermodynamics; Mechanical engineering; Geology","score_opus":0.008392546974703336,"score_gpt":0.2031210189139747,"score_spread":0.19472847193927134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409254736","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010722204,0.00015185108,0.97971046,0.00010850093,0.00007265301,0.00014180195,0.00008107317,0.0022627118,0.0067488407],"genre_scores_gemma":[0.291293,0.00015582661,0.693811,0.00010450147,0.000073685034,0.00041589924,0.00028140802,0.0004168045,0.01344791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960333,0.000069395435,0.000020071686,0.00007262585,0.00015918243,0.00007541788],"domain_scores_gemma":[0.99957186,0.00021764029,0.000023761704,0.000062765284,0.00009688347,0.000027180595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034458222,0.0012279458,0.0017014609,0.00047741338,0.0007799672,0.0013885173,0.0017406597,0.0011171619,0.014034241],"category_scores_gemma":[0.001010273,0.00071551505,0.00061308936,0.00078409415,0.00044055673,0.0011886009,0.0010467202,0.0013051883,0.002697569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007656762,0.0003149217,0.00047967827,0.00029771574,0.00004827321,0.00014102824,0.00010590174,0.6144991,0.025914118,0.010238064,0.010568797,0.33662677],"study_design_scores_gemma":[0.000047878173,0.00004178187,0.00010553272,0.0000033870456,0.000005913149,0.00001872047,0.000008420646,0.9962876,0.001757369,0.00088804984,0.0008264465,0.000008875384],"about_ca_topic_score_codex":0.009294404,"about_ca_topic_score_gemma":0.013031826,"teacher_disagreement_score":0.014034241,"about_ca_system_score_codex":0.00077974494,"about_ca_system_score_gemma":0.0020801579,"threshold_uncertainty_score":0.046949208},"labels":[],"label_agreement":null},{"id":"W4409259597","doi":"10.1016/j.enbuild.2025.115721","title":"Towards sustainable energy use: Reinforcement learning for demand response in commercial buildings","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brain Canada Foundation; Mila - Quebec Artificial Intelligence Institute; Canadian Institute for Advanced Research; HEC Montréal","funders":"Mitacs","keywords":"Reinforcement; Demand response; Reinforcement learning; Energy (signal processing); Energy demand; Architectural engineering; Sustainable energy; Engineering; Environmental economics; Computer science; Economics; Structural engineering; Renewable energy; Artificial intelligence; Electricity","score_opus":0.0065952216827555145,"score_gpt":0.218327315090431,"score_spread":0.2117320934076755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409259597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13558744,0.00077679695,0.8578502,0.0007426513,0.000050280185,0.00007967291,0.00006259338,0.0002903002,0.004560069],"genre_scores_gemma":[0.9776553,0.000142831,0.02140022,0.00005511822,0.000015589716,0.000041852785,0.000030318246,0.000015635604,0.00064304704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995809,0.0002386877,0.000013833213,0.00006214486,0.000058949903,0.000045392284],"domain_scores_gemma":[0.998423,0.0011681475,0.00016235036,0.000043798937,0.00013542066,0.00006729457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011368283,0.00064842147,0.00058383605,0.00026694094,0.00020063193,0.00072460686,0.0007625602,0.00078877906,0.0013933105],"category_scores_gemma":[0.0033631572,0.00024652743,0.0002832313,0.0002525019,0.00075077347,0.00078953593,0.00066101074,0.0009536635,0.00012067346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030180194,0.000036567104,0.00047193293,0.000028216855,0.000013906283,0.000018707919,0.0000144244905,0.9880751,0.00034298343,0.002006556,0.00018841785,0.008772943],"study_design_scores_gemma":[0.000003751482,0.00001037138,0.000052704276,0.000002040295,0.0000015086318,0.0000016536653,0.000003521349,0.99860007,0.00007349842,0.0011883845,0.0000613566,0.0000011781708],"about_ca_topic_score_codex":0.006573472,"about_ca_topic_score_gemma":0.0052267336,"teacher_disagreement_score":0.006573472,"about_ca_system_score_codex":0.00085806457,"about_ca_system_score_gemma":0.0008192873,"threshold_uncertainty_score":0.0130704045},"labels":[],"label_agreement":null},{"id":"W4409382064","doi":"10.1016/j.eneco.2025.108439","title":"The new merit order: The viability of energy-only electricity markets with only intermittent renewable energy sources and grid-scale storage","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Brandenburgische Technische Universität Cottbus-Senftenberg; Bundesministerium für Bildung, Wissenschaft, Forschung und Technologie; Bundesministerium für Bildung und Forschung","keywords":"Renewable energy; Environmental economics; Electricity; Scale (ratio); Grid; Order (exchange); Energy storage; Intermittent energy source; Economics; Electricity system; Natural resource economics; Distributed generation; Environmental science; Microeconomics; Business; Electricity generation; Engineering; Power (physics); Electrical engineering; Physics; Finance; Mathematics","score_opus":0.0023669905642531514,"score_gpt":0.15548266768341357,"score_spread":0.1531156771191604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409382064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7121707,0.0013365896,0.14070593,0.008335175,0.00024393229,0.00007385795,0.00036988896,0.00018021774,0.13658369],"genre_scores_gemma":[0.99304396,0.000185369,0.003442273,0.00012033307,0.00007330867,0.000012923878,0.00003357987,0.000018032728,0.0030702362],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99949837,0.00013532421,0.00001838091,0.00007052053,0.00016611068,0.00011136807],"domain_scores_gemma":[0.9974981,0.0011875397,0.00051622017,0.00030410348,0.00025582575,0.00023830259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011509538,0.00027991086,0.00073101453,0.00042968537,0.00084905553,0.0033818735,0.00076868146,0.0012945634,0.0069662165],"category_scores_gemma":[0.0061816424,0.00020405193,0.0007402065,0.00028463433,0.0028281196,0.008421793,0.0011096261,0.0015884587,0.00041096724],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112633425,0.000042625274,0.0011186642,0.00004103621,0.000014876653,0.0002014333,0.00007618601,0.013132296,0.0012150868,0.9767545,0.0014714826,0.0058191516],"study_design_scores_gemma":[0.00005493361,0.000080734004,0.0014403949,0.000020211084,0.000012402553,0.00015106233,0.0001340085,0.07016628,0.0008267493,0.9232143,0.0038756798,0.000023086119],"about_ca_topic_score_codex":0.00089865236,"about_ca_topic_score_gemma":0.0009578472,"teacher_disagreement_score":0.0069662165,"about_ca_system_score_codex":0.0013337942,"about_ca_system_score_gemma":0.0010872388,"threshold_uncertainty_score":0.023304284},"labels":[],"label_agreement":null},{"id":"W4409387610","doi":"10.1016/j.enbuild.2025.115738","title":"Demand response based battery energy storage systems design and operation optimization","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Battery (electricity); Energy storage; Battery storage; Automotive engineering; Energy (signal processing); Demand response; Computer science; Environmental science; Engineering; Reliability engineering; Electrical engineering; Power (physics); Electricity","score_opus":0.005043817147784627,"score_gpt":0.1785840767786421,"score_spread":0.17354025963085748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409387610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12432014,0.0013725013,0.82698417,0.0007629676,0.00013464058,0.00028633125,0.0005194796,0.00094068615,0.044679154],"genre_scores_gemma":[0.967688,0.00030068294,0.02156841,0.000061765095,0.000024902838,0.00019239816,0.00015710524,0.00008652989,0.009920171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998566,0.0000424323,0.0000073224865,0.00002312683,0.000047268215,0.00002329435],"domain_scores_gemma":[0.9998117,0.000078993144,0.000013926534,0.000010228026,0.000077406796,0.000007784568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000295446,0.00055456156,0.00077316415,0.00031142353,0.00036243835,0.0011643459,0.0007761221,0.00064771116,0.006077283],"category_scores_gemma":[0.0005333002,0.0005136169,0.00047514043,0.00047225127,0.00018687324,0.00080816715,0.00040251075,0.00052438164,0.00072648097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087497436,0.00005281964,0.00029635336,0.00012614191,0.000030325204,0.00004266465,0.00003378394,0.9646702,0.0042950604,0.0027315079,0.0013885056,0.026245132],"study_design_scores_gemma":[0.000006172078,0.000029379307,0.000096378906,0.0000028872932,0.0000072433304,0.000009855665,0.000014166923,0.99818283,0.0006854477,0.00052069285,0.0004421008,0.000002741367],"about_ca_topic_score_codex":0.0033647686,"about_ca_topic_score_gemma":0.006539181,"teacher_disagreement_score":0.006077283,"about_ca_system_score_codex":0.00063640345,"about_ca_system_score_gemma":0.00075577106,"threshold_uncertainty_score":0.020330548},"labels":[],"label_agreement":null},{"id":"W4409553296","doi":"10.1080/29931282.2025.2490525","title":"Local energy monitoring to support smart energy management and decarbonized town development","year":2025,"lang":"en","type":"article","venue":"Sustainable communities.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Council for Science, Technology and Innovation; Ministry of Education, Culture, Sports, Science and Technology; Swine Innovation Porc","keywords":"Energy (signal processing); Business; Energy management; Environmental planning; Environmental resource management; Geography; Environmental science; Physics","score_opus":0.007619600065118878,"score_gpt":0.20661879509182007,"score_spread":0.1989991950267012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409553296","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9042361,0.00047085967,0.06840734,0.0007426783,0.000054634715,0.00034970185,0.0013606247,0.0018860664,0.022492044],"genre_scores_gemma":[0.9821056,0.00012853893,0.016120788,0.0000217731,0.000008697143,0.00006586065,0.0002943689,0.000023348592,0.0012310599],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99973124,0.00010182927,0.000015906568,0.000067621324,0.000042589298,0.000040907056],"domain_scores_gemma":[0.9994031,0.00016713674,0.0001182013,0.000111876594,0.00012632745,0.00007338194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004757427,0.00031129888,0.00019990193,0.0005888829,0.0003114868,0.0007503945,0.0004501323,0.0001969171,0.0027127592],"category_scores_gemma":[0.00095991703,0.00011679198,0.00014742966,0.0008532408,0.00023195031,0.00073911744,0.00089926814,0.00020159975,0.0003464365],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004467658,0.00069057936,0.3008769,0.0008799355,0.00016790435,0.0012165735,0.00393554,0.08812425,0.0489276,0.0063199634,0.010965501,0.5374485],"study_design_scores_gemma":[0.00015463118,0.0008505584,0.41642648,0.0004418775,0.00029253258,0.0004407218,0.017710026,0.40346292,0.054366212,0.011147939,0.09455038,0.00015581232],"about_ca_topic_score_codex":0.004188942,"about_ca_topic_score_gemma":0.0074640797,"teacher_disagreement_score":0.004188942,"about_ca_system_score_codex":0.0004710911,"about_ca_system_score_gemma":0.00048946904,"threshold_uncertainty_score":0.009075046},"labels":[],"label_agreement":null},{"id":"W4409695000","doi":"10.1016/j.jup.2025.101942","title":"Transforming marginal-cost pricing: A blockchain approach to fundamental energy system dynamics","year":2025,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute for Clinical Evaluative Sciences","funders":"","keywords":"Blockchain; System dynamics; Economics; Marginal cost; Dynamics (music); Energy (signal processing); Mathematical economics; Microeconomics; Computer science; Mathematics; Physics; Computer security; Statistics","score_opus":0.007866422693206497,"score_gpt":0.21289360427835533,"score_spread":0.20502718158514882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409695000","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011153273,0.00038594613,0.96050644,0.002442658,0.00014976485,0.00007832175,0.00016668897,0.00014080286,0.024976132],"genre_scores_gemma":[0.8642827,0.0012708632,0.12118671,0.00032636352,0.00022039015,0.00032470893,0.00014200121,0.00012173178,0.012124419],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986085,0.0008027882,0.00004368467,0.00015495258,0.00027014775,0.00012001484],"domain_scores_gemma":[0.9962937,0.0024686984,0.00026074215,0.0004918091,0.00031320375,0.00017185997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025935746,0.00070779916,0.00091083633,0.00066299434,0.0011006235,0.0026554302,0.0017604355,0.0017100476,0.009978349],"category_scores_gemma":[0.007827249,0.00046343094,0.00078529544,0.001178113,0.003048448,0.0049217865,0.0030356566,0.0028445784,0.0008315325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003059012,0.000024253646,0.0001570055,0.000041515363,0.000017570112,0.00009567342,0.00016380637,0.18221168,0.00033290856,0.80709386,0.0009471172,0.00888407],"study_design_scores_gemma":[0.0000136469,0.000017005914,0.000029007653,0.000018434801,0.0000049597807,0.000018710949,0.00003865451,0.32697913,0.000112940405,0.66943717,0.0033204483,0.000009960423],"about_ca_topic_score_codex":0.003766888,"about_ca_topic_score_gemma":0.003866839,"teacher_disagreement_score":0.009978349,"about_ca_system_score_codex":0.0020030492,"about_ca_system_score_gemma":0.0022952317,"threshold_uncertainty_score":0.033380926},"labels":[],"label_agreement":null},{"id":"W4409786295","doi":"10.1016/j.esr.2025.101712","title":"Penalty mechanism in transactive energy: A mechanism design approach for day-ahead markets","year":2025,"lang":"en","type":"article","venue":"Energy Strategy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Fondation de l’UQTR; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Mechanism (biology); Transactive memory; Mechanism design; Energy (signal processing); Computer science; Risk analysis (engineering); Economics; Business; Environmental economics; Microeconomics; Mathematics; Knowledge management","score_opus":0.03127597932638341,"score_gpt":0.24413817615946412,"score_spread":0.21286219683308072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409786295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003018027,0.0010455531,0.98505116,0.0011554152,0.000117836935,0.00023460701,0.000029083747,0.000099059966,0.0092491675],"genre_scores_gemma":[0.38369057,0.0033604964,0.59789073,0.000994966,0.0003123326,0.0019251698,0.00007854313,0.0001542353,0.011592939],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9886312,0.0071564033,0.0006607561,0.0012249423,0.0018270141,0.0004996189],"domain_scores_gemma":[0.9873418,0.007895366,0.0013568045,0.0016924384,0.0013163738,0.00039715052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01849473,0.0015161342,0.0016384544,0.002058626,0.0012618306,0.0060967905,0.004353117,0.00424521,0.006410867],"category_scores_gemma":[0.020388778,0.0011433248,0.0029567175,0.0017424554,0.0058524376,0.008977848,0.0034033887,0.005375859,0.00079287787],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000384033,0.000050320323,0.00014755265,0.00022944664,0.00006423368,0.00007899446,0.00016687934,0.03214133,0.0006935842,0.95244557,0.0004830023,0.013460685],"study_design_scores_gemma":[0.00009562815,0.00019382541,0.00010547364,0.00021257128,0.00006941079,0.0001646213,0.00009729484,0.13943434,0.0012630661,0.8422096,0.016098635,0.000055528468],"about_ca_topic_score_codex":0.00096333947,"about_ca_topic_score_gemma":0.00070688274,"teacher_disagreement_score":0.01849473,"about_ca_system_score_codex":0.0037438767,"about_ca_system_score_gemma":0.0047599794,"threshold_uncertainty_score":0.097810626},"labels":[],"label_agreement":null},{"id":"W4409905083","doi":"10.1016/j.compeleceng.2025.110356","title":"Technical assessment framework for cost-sharing agreements in transactive energy systems","year":2025,"lang":"en","type":"article","venue":"Computers & Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transactive memory; Energy (signal processing); Computer science; Risk analysis (engineering); Process management; Business; Knowledge management; Systems engineering; Engineering; Mathematics","score_opus":0.007288148101133696,"score_gpt":0.2392749380800018,"score_spread":0.2319867899788681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409905083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040357197,0.00023019675,0.93507296,0.0015680676,0.00016303961,0.0005599703,0.00027062182,0.00037663744,0.057722665],"genre_scores_gemma":[0.33507052,0.00074293447,0.6341601,0.0006802522,0.00029412407,0.0015600974,0.0007166056,0.00029694772,0.026478522],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.97978663,0.008664312,0.001400111,0.0011772298,0.0075925803,0.0013791348],"domain_scores_gemma":[0.9899283,0.0031948842,0.00060320616,0.0011566684,0.004724347,0.0003924604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025019271,0.0023945177,0.0014636004,0.0051143216,0.0032136554,0.014142158,0.006043989,0.0055197156,0.012213677],"category_scores_gemma":[0.0219463,0.0011432742,0.0024773285,0.0035430402,0.0033300489,0.009771149,0.0054266015,0.005288794,0.002566266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009443967,0.000043663258,0.000121790334,0.000053464188,0.000017815184,0.00007145203,0.000101820886,0.052826352,0.00033147982,0.9341099,0.0020799777,0.010232704],"study_design_scores_gemma":[0.000026255439,0.00006954316,0.00021662537,0.0002177019,0.000043468106,0.00013138693,0.00028134228,0.2763171,0.0010913222,0.69036674,0.031177174,0.00006131956],"about_ca_topic_score_codex":0.012100562,"about_ca_topic_score_gemma":0.010841993,"teacher_disagreement_score":0.025019271,"about_ca_system_score_codex":0.006529644,"about_ca_system_score_gemma":0.013196897,"threshold_uncertainty_score":0.13231617},"labels":[],"label_agreement":null},{"id":"W4410080006","doi":"10.1016/j.enconman.2025.119868","title":"Optimized energy management in Grid-Connected microgrids leveraging K-means clustering algorithm and Artificial Neural network models","year":2025,"lang":"en","type":"article","venue":"Energy Conversion and Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada's Ocean Supercluster; National Research Foundation","keywords":"Artificial neural network; Cluster analysis; Computer science; Grid; Energy (signal processing); Algorithm; Artificial intelligence; Mathematics","score_opus":0.008066157190589033,"score_gpt":0.1877618655414545,"score_spread":0.17969570835086546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410080006","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.068870544,0.0006731706,0.9231886,0.00018927445,0.000056326808,0.00006722805,0.00009684939,0.0004842698,0.0063737286],"genre_scores_gemma":[0.93568844,0.00034871258,0.06154869,0.00005658321,0.000020016354,0.00008583247,0.00013906391,0.00005500806,0.0020577398],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998128,0.000060139722,0.000011115757,0.00004385614,0.00004911003,0.000023015895],"domain_scores_gemma":[0.99983835,0.000059738144,0.000033507218,0.000014183101,0.00004416727,0.000010043561],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040203964,0.0008577005,0.0006463588,0.00039160607,0.00035368078,0.00079481147,0.0007446113,0.00047526316,0.0006518731],"category_scores_gemma":[0.0007393062,0.00036966856,0.0004919945,0.00050979585,0.00031030682,0.0006661983,0.0004946579,0.000485043,0.00015341442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012636724,0.000009478162,0.0001692409,0.000015404628,0.00001759019,0.000009551834,0.000008428444,0.99151856,0.00034656172,0.000717943,0.00014560818,0.0070289876],"study_design_scores_gemma":[0.0000012817325,0.0000042561305,0.000058733334,0.0000015074326,0.0000024038904,0.0000018568953,0.0000031300688,0.9992575,0.000097958604,0.0004820372,0.000087661436,0.0000015724377],"about_ca_topic_score_codex":0.0134598715,"about_ca_topic_score_gemma":0.013864815,"teacher_disagreement_score":0.0134598715,"about_ca_system_score_codex":0.00077598344,"about_ca_system_score_gemma":0.0009457776,"threshold_uncertainty_score":0.026763022},"labels":[],"label_agreement":null},{"id":"W4410164309","doi":"10.2139/ssrn.5244865","title":"Risk-Averse Lot-Sizing Model for Microgrids Under Energy Degradation","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Dalhousie University","funders":"","keywords":"Sizing; Degradation (telecommunications); Energy (signal processing); Economics; Computer science; Microeconomics; Environmental economics; Mathematical optimization; Business; Biochemical engineering; Engineering; Mathematics; Chemistry; Statistics; Telecommunications","score_opus":0.010081363932103692,"score_gpt":0.21990430087652943,"score_spread":0.20982293694442575,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410164309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17620383,0.0016393503,0.7928341,0.0014894295,0.00019854761,0.00020640192,0.0014370553,0.00088845193,0.025102848],"genre_scores_gemma":[0.97559285,0.0003429789,0.0106448755,0.00010746021,0.000036429723,0.00009746534,0.00021593894,0.000065039814,0.012897089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952555,0.00017877342,0.00001990653,0.00010116103,0.000081294005,0.00009339552],"domain_scores_gemma":[0.998792,0.000701762,0.00016920685,0.00005931307,0.00018977992,0.00008803738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014228249,0.0011352466,0.002166968,0.00054392027,0.0004791227,0.0016726818,0.0019733554,0.0019562384,0.007626885],"category_scores_gemma":[0.0025507074,0.0010758569,0.0010276292,0.0007843852,0.0010298063,0.0013899225,0.0010228193,0.0015710187,0.0006033484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025679186,0.0000066533694,0.000080706144,0.000016706817,0.00001379344,0.000028134753,0.000010706699,0.996552,0.00014152218,0.002112258,0.00019414998,0.00081770564],"study_design_scores_gemma":[0.000006330925,0.000011525036,0.00006049535,0.0000025130453,0.0000068943614,0.0000072638013,0.000004063924,0.99790704,0.000031258012,0.001884439,0.000074965494,0.0000031823965],"about_ca_topic_score_codex":0.014441431,"about_ca_topic_score_gemma":0.01185082,"teacher_disagreement_score":0.014441431,"about_ca_system_score_codex":0.001462468,"about_ca_system_score_gemma":0.0013876264,"threshold_uncertainty_score":0.028714716},"labels":[],"label_agreement":null},{"id":"W4410191116","doi":"10.18280/mmep.120426","title":"Congestion and Workflow Management in Energy Systems Using Adaptive Generation Rescheduling Techniques","year":2025,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Computer science; Workflow management system; Distributed computing; Systems engineering; Database; Engineering","score_opus":0.025932977200207583,"score_gpt":0.20663239179649226,"score_spread":0.1806994145962847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410191116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044870805,0.00035903318,0.95236456,0.00031139038,0.00007623188,0.000039904367,0.0000314102,0.00013652923,0.0018101567],"genre_scores_gemma":[0.90539104,0.0003725892,0.091489434,0.000037296548,0.000069800175,0.000049940765,0.000042027637,0.000048720703,0.0024991564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991899,0.00038018482,0.00004287158,0.00011776521,0.00014981872,0.000119407974],"domain_scores_gemma":[0.9979298,0.0014191456,0.00018604545,0.00012669388,0.00023129763,0.00010703608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002476491,0.00051154185,0.0011316416,0.0007213414,0.0007994412,0.0017311992,0.0014850915,0.0007022159,0.0012109465],"category_scores_gemma":[0.005553721,0.00047541477,0.000848899,0.0015434214,0.0010926422,0.0023659484,0.0010152961,0.0011785193,0.000093681025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005342035,0.00005001092,0.00026520796,0.000024702813,0.00002116812,0.000029229255,0.00004271953,0.96584654,0.0004711913,0.018045247,0.0002722003,0.014878394],"study_design_scores_gemma":[0.0000028833997,0.0000047842677,0.00003502167,0.0000010831565,0.0000025539732,0.0000028652805,0.000005073891,0.99665904,0.00007998449,0.0031467378,0.000057883877,0.0000020638256],"about_ca_topic_score_codex":0.014240213,"about_ca_topic_score_gemma":0.009073613,"teacher_disagreement_score":0.014240213,"about_ca_system_score_codex":0.0015159906,"about_ca_system_score_gemma":0.0019894976,"threshold_uncertainty_score":0.02831465},"labels":[],"label_agreement":null},{"id":"W4410246268","doi":"10.1016/j.renene.2025.123390","title":"Clustering-driven design and predictive control of hybrid PV-battery storage systems for demand response in energy communities","year":2025,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Collège Shawinigan; University of Waterloo; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Natural Resources Canada; Hydro-Québec","keywords":"Demand response; Cluster analysis; Battery (electricity); Battery storage; Model predictive control; Energy storage; Control (management); Computer science; Photovoltaic system; Automotive engineering; Environmental science; Engineering; Electrical engineering; Machine learning; Artificial intelligence; Power (physics); Electricity","score_opus":0.008960508546860778,"score_gpt":0.19488571828762424,"score_spread":0.18592520974076346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410246268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14391822,0.0002792862,0.8404557,0.00022740048,0.000049560545,0.00017299072,0.00012231705,0.0007952748,0.013979128],"genre_scores_gemma":[0.9920643,0.000032627064,0.006942812,0.0000130361395,0.0000039465776,0.000056069428,0.000026530724,0.000012169737,0.00084851653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975604,0.000052011084,0.0000100125335,0.000057238394,0.000084594154,0.000040041807],"domain_scores_gemma":[0.9997385,0.00008183714,0.000058398306,0.000017417737,0.00008745815,0.000016380014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042120292,0.0005211885,0.00043055977,0.00022291804,0.00042990642,0.0008498029,0.00083275966,0.00038088628,0.0012181597],"category_scores_gemma":[0.00068853225,0.0003368772,0.0003313184,0.00025133532,0.00038097435,0.0003603318,0.00059297495,0.00046491402,0.00022242568],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057716356,0.000033047418,0.00026147408,0.000037008387,0.00001460661,0.000027848548,0.00003369395,0.9830036,0.0036434105,0.0011352848,0.00025281624,0.011499486],"study_design_scores_gemma":[0.000004043167,0.000028505501,0.00013991613,0.000001736346,0.000002865758,0.0000034052498,0.0000074801164,0.9987159,0.00065854506,0.0003058198,0.00012942521,0.00000226148],"about_ca_topic_score_codex":0.010121818,"about_ca_topic_score_gemma":0.013011057,"teacher_disagreement_score":0.010121818,"about_ca_system_score_codex":0.00075691025,"about_ca_system_score_gemma":0.0008363656,"threshold_uncertainty_score":0.020125806},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"methods","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W4410342861","doi":"10.1109/access.2025.3569761","title":"Comprehensive Review on the Control of Heat Pumps for Energy Flexibility in Distribution Networks","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Mitacs","keywords":"Flexibility (engineering); Computer science; Control (management); Energy (signal processing); Distribution (mathematics); Physics; Mathematics; Artificial intelligence","score_opus":0.025619588827059833,"score_gpt":0.28424259211763603,"score_spread":0.2586230032905762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410342861","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003877402,0.9866029,0.0050385646,0.00046272107,0.000683891,0.00001941332,0.000051277202,0.00004167666,0.0067118034],"genre_scores_gemma":[0.0050711613,0.9888433,0.0020660318,0.00035521082,0.0008562541,0.000025038042,0.00008852156,0.00001412184,0.0026804118],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996915,0.000060001013,0.00003927419,0.000058483118,0.00012361445,0.000027097449],"domain_scores_gemma":[0.99943775,0.00032803125,0.00006587408,0.000022072756,0.0001258248,0.00002043235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046864068,0.0012394607,0.0010631781,0.0011962502,0.00027002054,0.0009974203,0.0008202877,0.0011853306,0.0064603332],"category_scores_gemma":[0.0008226768,0.00039680814,0.0007169693,0.0019562794,0.0003223185,0.0013673693,0.00047591826,0.0010634267,0.001955411],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000914191,0.00011696249,0.00021502253,0.026336428,0.00015549874,0.00020375891,0.00008580563,0.009097875,0.00425132,0.020915756,0.052046504,0.88648367],"study_design_scores_gemma":[0.000013186137,0.00016803844,0.0007028195,0.004534692,0.00016278382,0.00029396336,0.000046626432,0.0027167508,0.0010855914,0.0056741275,0.9845621,0.00003927665],"about_ca_topic_score_codex":0.0021763938,"about_ca_topic_score_gemma":0.0021702286,"teacher_disagreement_score":0.0064603332,"about_ca_system_score_codex":0.0005411418,"about_ca_system_score_gemma":0.0011759609,"threshold_uncertainty_score":0.021611989},"labels":[],"label_agreement":null},{"id":"W4410352968","doi":"10.1016/j.isci.2025.112662","title":"Growing the power system: Expansions on transmission and distribution systems for deep electrification","year":2025,"lang":"en","type":"review","venue":"iScience","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electrification; Engineering physics; Distribution (mathematics); Environmental science; Engineering; Electrical engineering; Mathematics; Electricity","score_opus":0.016619100564993022,"score_gpt":0.25683530151050327,"score_spread":0.24021620094551024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410352968","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00023003812,0.9934256,0.00048642114,0.0012183693,0.00024131502,0.000006639635,0.000015549733,0.00000777955,0.0043683113],"genre_scores_gemma":[0.002400231,0.99580944,0.00037516918,0.0003537725,0.00018385403,0.0000071432837,0.000017325096,0.00000271918,0.0008503854],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968505,0.00010120478,0.000022806707,0.00004896016,0.00011758716,0.000024435609],"domain_scores_gemma":[0.99948066,0.00030077735,0.00006456652,0.00002148818,0.00010869224,0.000023821704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007134869,0.0007575412,0.00072692655,0.0019682401,0.00038374605,0.0011949417,0.00061251724,0.0011849181,0.0053728307],"category_scores_gemma":[0.0010131018,0.00028478255,0.0005630852,0.0035483371,0.00067071983,0.002480079,0.000773797,0.0017645663,0.0016039952],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035772464,0.000046155514,0.00019228092,0.016521463,0.000089143825,0.00016163226,0.00014632381,0.001538813,0.0007343047,0.05286139,0.027534107,0.90013844],"study_design_scores_gemma":[0.0000066575303,0.000056281693,0.0006725211,0.007912188,0.000086084416,0.00046196583,0.00013623282,0.00024945586,0.00026848237,0.013038319,0.97709477,0.000016973885],"about_ca_topic_score_codex":0.0025192832,"about_ca_topic_score_gemma":0.004113981,"teacher_disagreement_score":0.0053728307,"about_ca_system_score_codex":0.00094667193,"about_ca_system_score_gemma":0.0018030762,"threshold_uncertainty_score":0.0179739},"labels":[],"label_agreement":null},{"id":"W4410634303","doi":"10.1007/978-981-96-4914-3_2","title":"Key Application Use Cases in Microgrids","year":2025,"lang":"en","type":"book-chapter","venue":"Power systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Key (lock); Biochemical engineering; Computer science; Engineering; Computer security","score_opus":0.01093343678697574,"score_gpt":0.1909003701080431,"score_spread":0.17996693332106733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410634303","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030240987,0.017462231,0.04664634,0.0014650294,0.0011433047,0.000106460146,0.0002519305,0.0006200312,0.9292805],"genre_scores_gemma":[0.035803966,0.035387274,0.042769954,0.0008383267,0.0007332088,0.00012546235,0.00052189286,0.00060021627,0.8832198],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99974483,0.00005607717,0.000013553241,0.000030701507,0.00012121369,0.000033591525],"domain_scores_gemma":[0.9998149,0.000088939014,0.000009072834,0.000023930057,0.000047948033,0.000015241508],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027350098,0.0009796881,0.0003996954,0.0010047073,0.00078239763,0.0032281883,0.00081432203,0.0011817642,0.03509615],"category_scores_gemma":[0.00059553277,0.0003994554,0.0004253539,0.0023034764,0.00053899235,0.003315612,0.0010061206,0.0013925682,0.015149521],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032900178,0.000080210026,0.00021557318,0.00072546804,0.000008752117,0.0011577373,0.0006754607,0.0054030777,0.0036192308,0.29680896,0.25197408,0.43929857],"study_design_scores_gemma":[0.000002056532,0.000016640737,0.00017369987,0.0003466022,0.000005130175,0.0011856847,0.00024329843,0.0032855284,0.001414114,0.039693817,0.9536223,0.000011102408],"about_ca_topic_score_codex":0.0012838758,"about_ca_topic_score_gemma":0.0034964173,"teacher_disagreement_score":0.03509615,"about_ca_system_score_codex":0.0006420008,"about_ca_system_score_gemma":0.00037919002,"threshold_uncertainty_score":0.117408276},"labels":[],"label_agreement":null},{"id":"W4410734654","doi":"10.35833/mpce.2024.000469","title":"Cost-aware Flexibility Evaluation for Microgrids","year":2024,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Flexibility (engineering); Reliability engineering; Risk analysis (engineering); Computer science; Engineering; Business; Economics","score_opus":0.033498996096947356,"score_gpt":0.27394518338181967,"score_spread":0.24044618728487233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410734654","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15134695,0.00072365446,0.8381002,0.00031824847,0.000035863985,0.00014944653,0.00017578935,0.00018808614,0.008961727],"genre_scores_gemma":[0.97249275,0.00017682281,0.026503548,0.0000158513,0.000011023027,0.00004878243,0.000056148983,0.000027401913,0.0006676215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918896,0.00043709102,0.000029473496,0.000058846028,0.00021420568,0.0000715568],"domain_scores_gemma":[0.9987117,0.0009329056,0.00012331523,0.00006279457,0.00011853004,0.00005065212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017168614,0.0010578184,0.0006602398,0.0010920402,0.00036627936,0.001077284,0.0006209799,0.000619572,0.0014774941],"category_scores_gemma":[0.004586504,0.00041136038,0.0007940582,0.0007660029,0.0005081512,0.0010994368,0.000890763,0.0006196237,0.0000864416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021303833,0.000008004404,0.00039292173,0.000022640257,0.000014722801,0.000037105252,0.000011435857,0.98986536,0.00036779494,0.002954249,0.000073820695,0.006230544],"study_design_scores_gemma":[0.000001933013,0.000016436205,0.00017041805,0.0000060629873,0.0000043141454,0.000010759972,0.000010781491,0.9979381,0.00015464841,0.0015858109,0.000096787495,0.000003965351],"about_ca_topic_score_codex":0.004199884,"about_ca_topic_score_gemma":0.003917839,"teacher_disagreement_score":0.004199884,"about_ca_system_score_codex":0.0011046001,"about_ca_system_score_gemma":0.0006876064,"threshold_uncertainty_score":0.009079754},"labels":[],"label_agreement":null},{"id":"W4410810570","doi":"10.1109/fccm62733.2025.00045","title":"Chronbench: An Incremental HDL Benchmark Suite","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Suite; Benchmark (surveying); Computer science; Geology","score_opus":0.004720689537096986,"score_gpt":0.20760507822377233,"score_spread":0.20288438868667535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410810570","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69346774,0.002330243,0.14609629,0.00092239433,0.0005485694,0.0010333421,0.05593524,0.047009047,0.052657127],"genre_scores_gemma":[0.6708645,0.0012371883,0.19640884,0.00032649626,0.00008513233,0.00093645434,0.11547162,0.0043756743,0.010294114],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987637,0.00028813793,0.00012012648,0.00013760648,0.0005350793,0.00015542706],"domain_scores_gemma":[0.99676514,0.0014433798,0.00023473118,0.0006096069,0.0008145967,0.00013252324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016987297,0.0010305827,0.00028963984,0.0019448856,0.00034551532,0.00068878755,0.0019559807,0.00054369087,0.0038708688],"category_scores_gemma":[0.00510902,0.00035379865,0.0005152237,0.0020884878,0.00035766265,0.0008534473,0.00062937214,0.0008057595,0.00076344324],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017764034,0.0016034172,0.039717045,0.0033118802,0.00045545632,0.0018434058,0.00053157966,0.3166726,0.06304677,0.025364485,0.21098512,0.33469182],"study_design_scores_gemma":[0.0007256155,0.0023245153,0.020433782,0.00024543933,0.00022138002,0.0010743391,0.00044426342,0.6800422,0.116568066,0.013774433,0.16400659,0.00013941374],"about_ca_topic_score_codex":0.0038892103,"about_ca_topic_score_gemma":0.007909794,"teacher_disagreement_score":0.0038892103,"about_ca_system_score_codex":0.0005934335,"about_ca_system_score_gemma":0.0011497353,"threshold_uncertainty_score":0.0129493475},"labels":[],"label_agreement":null},{"id":"W4410864334","doi":"10.3390/smartcities8030088","title":"Fairness-Oriented Volt–Watt Control Methods of PV Units for Over-Voltage Suppression in PV-Enriched Smart Cities","year":2025,"lang":"en","type":"article","venue":"Smart Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Emera; Atlantic Canada Opportunities Agency; Mitacs","keywords":"Watt; Volt; Photovoltaic system; Electrical engineering; Voltage; Control (management); Computer science; Automotive engineering; Power (physics); Engineering; Physics","score_opus":0.013405735849947982,"score_gpt":0.2709698441236685,"score_spread":0.2575641082737205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410864334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00796518,0.00008242035,0.99045557,0.000029679675,0.00001897028,0.00003698288,0.000005323887,0.00014525784,0.0012606106],"genre_scores_gemma":[0.8356619,0.00017937704,0.16112205,0.000049028946,0.000040152045,0.00011845001,0.00001690273,0.00008518252,0.0027269989],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992124,0.00026501357,0.000039968087,0.00014534459,0.00027697088,0.000060308583],"domain_scores_gemma":[0.9988255,0.00053179084,0.00018608692,0.00012128045,0.00030127156,0.00003411561],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015384041,0.00067688385,0.0005348121,0.0005755438,0.0004279332,0.0008840178,0.0008337879,0.00038681124,0.0016102531],"category_scores_gemma":[0.0030362643,0.00026797267,0.0004178339,0.0004595109,0.00072378793,0.0008514082,0.00063081074,0.0007036123,0.00024566724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002420745,0.00009994843,0.00073805853,0.00015039882,0.00003212784,0.00007384123,0.0003342269,0.6877085,0.023364414,0.03627947,0.0007481916,0.25022864],"study_design_scores_gemma":[0.000015087504,0.00008489857,0.00016191398,0.0000095592,0.000007933294,0.00002706275,0.000016246086,0.98598087,0.005100465,0.007304856,0.0012803896,0.00001079843],"about_ca_topic_score_codex":0.0014450055,"about_ca_topic_score_gemma":0.0014056326,"teacher_disagreement_score":0.0016102531,"about_ca_system_score_codex":0.0008333681,"about_ca_system_score_gemma":0.0005774975,"threshold_uncertainty_score":0.008135974},"labels":[],"label_agreement":null},{"id":"W4410889971","doi":"10.5267/j.ijiec.2025.4.006","title":"A game-theoretic model for renewable and conventional energy generators under tradable green certificate mechanism","year":2025,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Qinglan Project of Jiangsu Province of China; Yangzhou University; National Natural Science Foundation of China","keywords":"Renewable energy; Certificate; Mechanism (biology); Environmental economics; Economics; Microeconomics; Biochemical engineering; Computer science; Mathematical economics; Engineering; Physics; Electrical engineering","score_opus":0.04296534069602469,"score_gpt":0.24443885250590533,"score_spread":0.20147351180988066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410889971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10482482,0.00060246733,0.823002,0.0025632936,0.00015538362,0.00044255136,0.0009531445,0.00022483779,0.0672316],"genre_scores_gemma":[0.9408241,0.0004918323,0.029555334,0.00022131905,0.00006038547,0.00037169448,0.00016847088,0.000033561275,0.02827334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987016,0.0005764049,0.00004300099,0.00026021383,0.00020949366,0.00020926463],"domain_scores_gemma":[0.99874985,0.0007060743,0.00021973172,0.000067109046,0.00013128204,0.00012589981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016839227,0.0013253638,0.0013590972,0.0007301689,0.0009044183,0.0028006353,0.0029122615,0.0036509514,0.010498603],"category_scores_gemma":[0.0027110996,0.00062074466,0.0011434876,0.0010329654,0.0019139241,0.003470252,0.0014631666,0.0020638716,0.0010073915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000925347,0.00007563974,0.00032592058,0.00006594811,0.000029897257,0.00046106978,0.00012953837,0.6538825,0.0014024301,0.3393417,0.0011774402,0.0030153564],"study_design_scores_gemma":[0.00007082232,0.000057024794,0.00011802859,0.000011221481,0.000014724443,0.00006855229,0.00006232703,0.93402433,0.0001423364,0.063918486,0.001490346,0.000021878492],"about_ca_topic_score_codex":0.008520624,"about_ca_topic_score_gemma":0.007888531,"teacher_disagreement_score":0.010498603,"about_ca_system_score_codex":0.0027766966,"about_ca_system_score_gemma":0.0023977584,"threshold_uncertainty_score":0.03512138},"labels":[],"label_agreement":null},{"id":"W4411014668","doi":"10.3386/w33836","title":"Take the Load Off: Effort and Technology as Determinants of Electricity Demand Response","year":2025,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada First Research Excellence Fund; University of Alberta; University of Calgary","keywords":"Demand response; Electricity; Electricity demand; Response time; Economics; Environmental economics; Computer science; Business; Electricity generation; Engineering; Power (physics); Electrical engineering; Computer graphics (images)","score_opus":0.09816702671126142,"score_gpt":0.4262062744734677,"score_spread":0.3280392477622063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411014668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99517894,0.000044533852,0.0011372173,0.00014412864,0.000009057019,0.00006389829,0.00008142569,0.000013510837,0.0033273017],"genre_scores_gemma":[0.99756193,0.000034313038,0.00067921774,0.00008773864,0.000006912897,0.00009045163,0.00008311151,0.000013232198,0.0014430858],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975515,0.0016527226,0.00008943476,0.00029602702,0.0002182398,0.00019211587],"domain_scores_gemma":[0.9714289,0.022777576,0.002563739,0.0015711891,0.00066941633,0.0009891483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030985037,0.00031211073,0.00029852145,0.0002964745,0.0003801751,0.0012354902,0.0004856657,0.00072995434,0.005648429],"category_scores_gemma":[0.019869125,0.00019693379,0.0003646563,0.00028592657,0.0007366686,0.0011205454,0.0011023302,0.0006987103,0.0006373886],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0054592737,0.006119647,0.8939358,0.00022981154,0.00032372482,0.00042512262,0.0052710148,0.005196028,0.022362852,0.0041992245,0.0012445184,0.05523301],"study_design_scores_gemma":[0.00007548503,0.0018862595,0.9821943,0.000036516907,0.00012860486,0.00008499955,0.0027712674,0.006167014,0.0029572633,0.0018803955,0.001786384,0.00003147915],"about_ca_topic_score_codex":0.0018565103,"about_ca_topic_score_gemma":0.0018370977,"teacher_disagreement_score":0.005648429,"about_ca_system_score_codex":0.00038660242,"about_ca_system_score_gemma":0.00027381536,"threshold_uncertainty_score":0.018895924},"labels":[],"label_agreement":null},{"id":"W4411047828","doi":"10.1016/j.apenergy.2025.126193","title":"Smart home integration and distribution network optimization through transactive energy framework – a review","year":2025,"lang":"en","type":"review","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Transactive memory; Computer science; Smart grid; Distribution (mathematics); Embedded system; Engineering; Knowledge management; Electrical engineering","score_opus":0.010073967528430846,"score_gpt":0.23205648461233058,"score_spread":0.22198251708389974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411047828","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019918513,0.99766695,0.0007175501,0.00013102731,0.00012407936,0.0000057120824,0.000015785832,0.000006800976,0.0011329297],"genre_scores_gemma":[0.0017708774,0.99695706,0.0006181748,0.00009472833,0.00017770643,0.000007164568,0.00002215129,0.0000025994564,0.000349537],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997185,0.000042662698,0.00003457142,0.00007144276,0.00011005358,0.000022847482],"domain_scores_gemma":[0.99947184,0.0003040188,0.00009047558,0.000018428796,0.000095109936,0.000020173473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007828861,0.0011779576,0.0018766222,0.002016622,0.00025051495,0.0016541146,0.0009552203,0.0012888225,0.0040574507],"category_scores_gemma":[0.0010006588,0.0004939533,0.00088241964,0.004190052,0.00044230046,0.0020358765,0.0008657265,0.0010969845,0.0010134339],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078384415,0.00016900817,0.000312706,0.03684651,0.000316114,0.00015039355,0.000069596164,0.00449507,0.0018235928,0.015236049,0.01731161,0.92319095],"study_design_scores_gemma":[0.000041516658,0.00032941395,0.0014661739,0.010098049,0.00083776226,0.00075117865,0.000151587,0.003384354,0.0014291742,0.011058768,0.97036415,0.000087934866],"about_ca_topic_score_codex":0.0014506826,"about_ca_topic_score_gemma":0.0023804642,"teacher_disagreement_score":0.0040574507,"about_ca_system_score_codex":0.00048129907,"about_ca_system_score_gemma":0.0013151322,"threshold_uncertainty_score":0.013573468},"labels":[],"label_agreement":null},{"id":"W4411171821","doi":"10.1109/access.2025.3578524","title":"An Improved MCDM Model to Support Smart Energy Management System in Smart Grid Paradigm","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Smart grid; Computer science; Multiple-criteria decision analysis; Grid; Systems engineering; Operations research; Engineering; Electrical engineering; Mathematics","score_opus":0.014922662692235886,"score_gpt":0.2575667728337426,"score_spread":0.2426441101415067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411171821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020765528,0.00025695626,0.9552017,0.0007656012,0.000098182485,0.00021285366,0.0005454481,0.0002486151,0.02190508],"genre_scores_gemma":[0.68564945,0.0004015341,0.30281192,0.00015059253,0.000048656788,0.00045782502,0.0005018004,0.000042496915,0.009935753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958616,0.00018126488,0.000022250368,0.000050413266,0.00011301199,0.000046888716],"domain_scores_gemma":[0.9996542,0.00014633102,0.00003111876,0.000022323873,0.00012573843,0.000020404093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007768828,0.00042148912,0.0006290019,0.0006954531,0.00063250057,0.0011917913,0.0012322757,0.0011939757,0.008204026],"category_scores_gemma":[0.0014216162,0.0002559293,0.0007151422,0.0011330384,0.000296414,0.0009377889,0.0008568403,0.00096928555,0.0005712558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044995,0.0000509775,0.00075199676,0.000091436385,0.000020434032,0.00012744783,0.000079455094,0.9418662,0.0007470311,0.03398729,0.0018984573,0.02033423],"study_design_scores_gemma":[0.000008564147,0.000016158489,0.00009601149,0.000010143324,0.0000046442406,0.000013707895,0.000021497639,0.9929817,0.00011051318,0.0047699506,0.0019629523,0.0000041787466],"about_ca_topic_score_codex":0.016645797,"about_ca_topic_score_gemma":0.021157518,"teacher_disagreement_score":0.016645797,"about_ca_system_score_codex":0.0011732723,"about_ca_system_score_gemma":0.0017497146,"threshold_uncertainty_score":0.033097804},"labels":[],"label_agreement":null},{"id":"W4411270987","doi":"10.1109/tsg.2025.3579648","title":"Frequency Reserve Service From Heat Pumps and Electrolyzers in Power Systems: A Sealed-Bid Auction Mechanism","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ontario Ministry of Research and Innovation","keywords":"Mechanism (biology); Service (business); Power (physics); Automotive engineering; Computer science; Environmental science; Engineering; Business; Thermodynamics; Physics","score_opus":0.006319783269904395,"score_gpt":0.1950863874720105,"score_spread":0.1887666042021061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411270987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16338007,0.00097119494,0.8264244,0.00036056575,0.0001124622,0.00032290004,0.00009563577,0.00026941206,0.008063326],"genre_scores_gemma":[0.97281975,0.00030016006,0.025295785,0.000035438043,0.00003403769,0.00009597168,0.000029914452,0.000014163075,0.0013746432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977664,0.0012944338,0.000106409156,0.00022205846,0.00036304072,0.0002477291],"domain_scores_gemma":[0.9975629,0.0015462751,0.0003376105,0.00014359422,0.00022399377,0.0001855977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035527302,0.000915671,0.0015417916,0.00054494356,0.0005694428,0.0027828442,0.0022268572,0.0016619128,0.0019870044],"category_scores_gemma":[0.0051788306,0.00064046925,0.0011137706,0.00077475136,0.0015014603,0.003007477,0.00118543,0.0011466924,0.00037901945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008582294,0.00045844424,0.0013041671,0.00036690914,0.00014159009,0.0010521384,0.0002459574,0.87257266,0.008062527,0.08687447,0.00132213,0.026740834],"study_design_scores_gemma":[0.0000988858,0.0002556297,0.00024039256,0.000012380292,0.000032627864,0.00017365943,0.000037411173,0.98530746,0.00067444873,0.012533714,0.0006002737,0.00003316571],"about_ca_topic_score_codex":0.0014640515,"about_ca_topic_score_gemma":0.00093774474,"teacher_disagreement_score":0.0035527302,"about_ca_system_score_codex":0.0009370556,"about_ca_system_score_gemma":0.0012643671,"threshold_uncertainty_score":0.018788874},"labels":[],"label_agreement":null},{"id":"W4411271941","doi":"10.1109/ias55788.2024.11023737","title":"A Cost-Effective and Eco-Friendly Micro-Grid by Employing a Model-Free Multi-Agent Reinforcement Learning Strategy for Power Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Reinforcement; Computer science; Grid; Environmentally friendly; Power grid; Power (physics); Artificial intelligence; Engineering; Mathematics","score_opus":0.01889808426368873,"score_gpt":0.2544526734960746,"score_spread":0.23555458923238587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411271941","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016331695,0.00018794823,0.9788594,0.00022261412,0.00003245672,0.000055527777,0.000018351291,0.0003711674,0.003920879],"genre_scores_gemma":[0.8849558,0.00018378602,0.112094864,0.00013284858,0.000034108092,0.00012630451,0.000035377452,0.00004675086,0.0023900606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997794,0.000064589876,0.000008954245,0.000045582772,0.000075063545,0.000026453868],"domain_scores_gemma":[0.9997348,0.000101092905,0.0000590578,0.000030781852,0.000051769184,0.000022519647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044833357,0.0005888287,0.0005373524,0.00021006889,0.00027969,0.00076065323,0.0011305689,0.0006206849,0.0013387487],"category_scores_gemma":[0.0008662992,0.0002073583,0.0003126325,0.00020194508,0.0005016833,0.0008370876,0.00063427084,0.00071158964,0.0003387341],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035107263,0.000065041975,0.00039628366,0.00005081305,0.000025574882,0.00009298476,0.00004378617,0.9427791,0.0034961908,0.009777486,0.0007949697,0.04244268],"study_design_scores_gemma":[0.000007798093,0.000019343308,0.000039397855,0.0000032947173,0.0000036258311,0.000013149241,0.0000041614944,0.9973188,0.00044156337,0.0016020789,0.0005439214,0.0000027438334],"about_ca_topic_score_codex":0.0022050606,"about_ca_topic_score_gemma":0.002620283,"teacher_disagreement_score":0.0022050606,"about_ca_system_score_codex":0.00053279323,"about_ca_system_score_gemma":0.000683125,"threshold_uncertainty_score":0.004478574},"labels":[],"label_agreement":null},{"id":"W4411272673","doi":"10.1016/j.renene.2025.123678","title":"Multi-agent systems in networked microgrids: Reinforcement learning and strategic pricing mechanisms","year":2025,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Government of Alberta","keywords":"Reinforcement learning; Reinforcement; Computer science; Business; Distributed computing; Engineering; Artificial intelligence; Structural engineering","score_opus":0.009939780422572481,"score_gpt":0.20426047123902322,"score_spread":0.19432069081645073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411272673","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04391057,0.00060034863,0.9480769,0.00063846866,0.00007886878,0.00005209827,0.00002112828,0.00017947018,0.0064421277],"genre_scores_gemma":[0.9637042,0.00032490722,0.03354032,0.00009522222,0.000047943016,0.00006886901,0.000015351696,0.000020760228,0.002182405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936193,0.00029974748,0.000026251586,0.00009375286,0.00014791147,0.000070366],"domain_scores_gemma":[0.9990576,0.00046708182,0.00017716274,0.00007595595,0.00013210166,0.00009002572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013455867,0.00065200636,0.0006880899,0.00028811817,0.00044751656,0.00117267,0.0012613805,0.0009639591,0.0012613246],"category_scores_gemma":[0.0030870333,0.00034762506,0.00044372812,0.0003217367,0.0011656126,0.0013500585,0.0012781639,0.001125253,0.00017787179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018319346,0.000030088268,0.000411181,0.000024462544,0.000027050803,0.000070007234,0.00003902313,0.96698403,0.0005345206,0.022844207,0.0002490755,0.008768022],"study_design_scores_gemma":[0.0000049579253,0.000011579264,0.000043825014,0.0000021207159,0.0000026582773,0.0000074411305,0.0000062880895,0.9929906,0.000068568275,0.006633343,0.00022582033,0.0000027678984],"about_ca_topic_score_codex":0.0040929476,"about_ca_topic_score_gemma":0.0029171284,"teacher_disagreement_score":0.0040929476,"about_ca_system_score_codex":0.00089951797,"about_ca_system_score_gemma":0.0009492854,"threshold_uncertainty_score":0.008138299},"labels":[],"label_agreement":null},{"id":"W4411363159","doi":"10.1088/2753-3751/ade548","title":"Process and policy insights from an intercomparison of open electricity system capacity expansion models","year":2025,"lang":"en","type":"article","venue":"Environmental Research Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"Alfred P. Sloan Foundation","keywords":"Electricity system; Process (computing); Electricity; Environmental science; Environmental economics; Computer science; Economics; Engineering; Electricity generation; Physics","score_opus":0.034427544336703315,"score_gpt":0.3101987950560601,"score_spread":0.27577125071935676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411363159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9490854,0.00015508417,0.034953278,0.0006785585,0.000041951087,0.00019737406,0.0012699238,0.00037801196,0.013240426],"genre_scores_gemma":[0.9870837,0.000043636664,0.011581582,0.000038411767,0.0000076460265,0.00009390312,0.0005129006,0.000062380444,0.0005760369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956203,0.0032634123,0.00012383795,0.00038572145,0.0003696261,0.00023715636],"domain_scores_gemma":[0.9895309,0.007934786,0.00075449294,0.00088655844,0.0007573914,0.00013577026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009528878,0.00064690143,0.00077924534,0.001030194,0.0007914723,0.0019136618,0.0014582216,0.0010260699,0.002404718],"category_scores_gemma":[0.017301181,0.0004355577,0.0010295141,0.0019299402,0.00090105133,0.0023518675,0.0014909344,0.0013553791,0.00013311376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015590194,0.00011552142,0.0031435208,0.000036208778,0.000071661125,0.000093200884,0.00022424523,0.98131394,0.0009340078,0.0077352216,0.00049549295,0.005681036],"study_design_scores_gemma":[0.0001468186,0.00022363603,0.0045703924,0.00003701829,0.00006520679,0.000023142356,0.00070899096,0.96902186,0.004309343,0.01755753,0.0032612495,0.00007474449],"about_ca_topic_score_codex":0.024513092,"about_ca_topic_score_gemma":0.012667347,"teacher_disagreement_score":0.024513092,"about_ca_system_score_codex":0.0032316474,"about_ca_system_score_gemma":0.0018139352,"threshold_uncertainty_score":0.050394118},"labels":[],"label_agreement":null},{"id":"W4411392800","doi":"10.20944/preprints202506.1369.v1","title":"Against High-Tech Global and Grid Approaches to Energy Transition: Post-Liberalism, Open Sourced Metabolism, and the Telos of Local Sustainability","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Environment and Climate Change Canada","funders":"","keywords":"Telos; Sustainability; Liberalism; Energy transition; Grid; Transition (genetics); Environmental economics; Political science; Economics; Geography; Chemistry; Ecology; Philosophy; Biology; Epistemology; Law; Geodesy","score_opus":0.06042052751784328,"score_gpt":0.26678540120531635,"score_spread":0.20636487368747308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411392800","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05046728,0.012109669,0.01170508,0.37134692,0.0014576121,0.000034556524,0.0000554704,0.00009740429,0.552726],"genre_scores_gemma":[0.9349004,0.0034681126,0.0020756775,0.032677703,0.0006386529,0.00007312826,0.000025482499,0.00007636898,0.026064519],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99665797,0.0016634902,0.000054161817,0.00041378077,0.00081566116,0.00039498694],"domain_scores_gemma":[0.99701834,0.0016192178,0.0002878542,0.00043710816,0.00032039074,0.00031712014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057180584,0.00039,0.0003488927,0.0008559064,0.003943556,0.010016941,0.0009010161,0.0047478215,0.004318721],"category_scores_gemma":[0.005578859,0.00015073261,0.00033952715,0.00088065333,0.03313696,0.008577944,0.00592103,0.007923026,0.00076088775],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012603112,0.000008407373,0.00011219594,0.000014896278,0.000002387176,0.00002575437,0.00071709394,0.00017274573,0.00004266128,0.9918744,0.0031451448,0.0038716611],"study_design_scores_gemma":[0.0000151116765,0.000017795554,0.00035495753,0.00011848963,0.000003210207,0.000043475025,0.002001197,0.0005204736,0.00017788129,0.9151352,0.08160294,0.00000924228],"about_ca_topic_score_codex":0.0029733684,"about_ca_topic_score_gemma":0.004325565,"teacher_disagreement_score":0.010016941,"about_ca_system_score_codex":0.005281953,"about_ca_system_score_gemma":0.0038731662,"threshold_uncertainty_score":0.038323462},"labels":[],"label_agreement":null},{"id":"W4411489131","doi":"10.3390/en18133245","title":"A Review of Optimization Strategies for Energy Management in Microgrids","year":2025,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Université de Sherbrooke","keywords":"Environmental economics; Renewable energy; Fossil fuel; Electrification; Energy management; Greenhouse gas; Risk analysis (engineering); Climate change; Computer science; Environmental resource management; Electricity; Business; Engineering; Environmental science; Energy (signal processing); Economics; Ecology","score_opus":0.014932278476376978,"score_gpt":0.27653018459380174,"score_spread":0.2615979061174248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411489131","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003132043,0.99118453,0.0047631734,0.00032757735,0.00026551614,0.000014259998,0.00005091554,0.00002419098,0.003056563],"genre_scores_gemma":[0.0032903543,0.99196833,0.0033734008,0.00015690223,0.00025795418,0.000020790303,0.00007989089,0.000011449732,0.00084083376],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957687,0.00009640238,0.00007309335,0.00008074386,0.0001460746,0.000026804335],"domain_scores_gemma":[0.9990207,0.0006269093,0.0000961205,0.000037743634,0.00019467215,0.000023872723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080154225,0.0016204563,0.0014629853,0.002000879,0.0003134159,0.0012953639,0.0010820883,0.0011140057,0.005039847],"category_scores_gemma":[0.0017917703,0.0005618864,0.0011687345,0.0045412807,0.00046131114,0.0015272523,0.0006158075,0.001204809,0.0017522599],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000656587,0.00010836931,0.00030255545,0.04234799,0.0002731866,0.00016379719,0.000109346205,0.012202093,0.0013397703,0.0263848,0.025940033,0.8907624],"study_design_scores_gemma":[0.000019451729,0.0001974623,0.0012282568,0.01403282,0.00040862107,0.0006623917,0.00013711351,0.004675818,0.0009857402,0.015602124,0.96198386,0.000066184235],"about_ca_topic_score_codex":0.0023641596,"about_ca_topic_score_gemma":0.0027163154,"teacher_disagreement_score":0.005039847,"about_ca_system_score_codex":0.0006950221,"about_ca_system_score_gemma":0.001478188,"threshold_uncertainty_score":0.016859949},"labels":[],"label_agreement":null},{"id":"W4411617996","doi":"10.51847/yxgp5etyb3","title":"10.51847/yxgP5eTyb3","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microgrid; Particle swarm optimization; Multi-swarm optimization; Computer science; Mathematical optimization; Artificial intelligence; Mathematics; Algorithm","score_opus":0.0035023101509749567,"score_gpt":0.14233308731749567,"score_spread":0.1388307771665207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411617996","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005235559,0.0007308453,0.008312311,0.0010076215,0.0008833064,0.0001815026,0.0013435716,0.0026097533,0.97969556],"genre_scores_gemma":[0.008089256,0.0002652429,0.0024178426,0.00035375706,0.0000757405,0.00005322103,0.00095800136,0.00031362203,0.98747337],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997292,0.000027951099,0.000020365735,0.00008181508,0.00007247032,0.00006821448],"domain_scores_gemma":[0.99947125,0.000099375124,0.000028621673,0.00009934585,0.00018149347,0.000120029326],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00042312598,0.0013503688,0.000564548,0.0015323448,0.0010758871,0.002268835,0.0008939655,0.0030101659,0.9286831],"category_scores_gemma":[0.00069355755,0.00041224915,0.0005536645,0.0018440674,0.00060697517,0.0014794426,0.0015857666,0.0009807579,0.93056554],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005273163,0.00026825324,0.0016141156,0.000291788,0.000033272696,0.0005490595,0.00009521252,0.0010111798,0.009939509,0.0054780184,0.17676735,0.80342484],"study_design_scores_gemma":[0.00008936266,0.00011320871,0.0014328785,0.00014566568,0.000026567921,0.00057821994,0.00012483257,0.0021019552,0.0037850514,0.0017833449,0.98979443,0.00002450985],"about_ca_topic_score_codex":0.0035252254,"about_ca_topic_score_gemma":0.0023288934,"teacher_disagreement_score":0.0713169,"about_ca_system_score_codex":0.00075551646,"about_ca_system_score_gemma":0.00046152712,"threshold_uncertainty_score":0.10172492},"labels":[],"label_agreement":null},{"id":"W4411618014","doi":"10.51847/t0bfrink50","title":"10.51847/T0BfRINk50","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Algorithm; Computer science; Optimization algorithm; Mathematical optimization; Mathematics","score_opus":0.0035677624482906923,"score_gpt":0.14259546805957185,"score_spread":0.13902770561128117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411618014","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014975152,0.0005774074,0.0041167205,0.00080895756,0.0006718724,0.00011968502,0.0010077485,0.0023910254,0.98880905],"genre_scores_gemma":[0.0047101523,0.00026554265,0.0015258398,0.0002512619,0.000069024834,0.000041968175,0.0006632543,0.0003239067,0.992149],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957436,0.000042353626,0.000033128064,0.00012556805,0.000134194,0.00009041965],"domain_scores_gemma":[0.99892396,0.00024577163,0.000053017644,0.0001745024,0.000418881,0.00018378925],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00060976914,0.0014912653,0.0007449924,0.0022194025,0.0014723493,0.0031478235,0.0012461827,0.0040056487,0.9605829],"category_scores_gemma":[0.0010885156,0.0004079249,0.00059403304,0.0020222592,0.0009236825,0.002417704,0.0015643806,0.0013325379,0.9637016],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003912994,0.00020803667,0.00073025405,0.00031983713,0.000018504583,0.0003342312,0.000098621815,0.0006748605,0.004656875,0.005376982,0.29357836,0.6936121],"study_design_scores_gemma":[0.00006020044,0.0000911643,0.0007614448,0.00018129875,0.000014895837,0.00039564408,0.000106399675,0.001238486,0.00161803,0.0013256292,0.9941803,0.000026530679],"about_ca_topic_score_codex":0.004472225,"about_ca_topic_score_gemma":0.0034140588,"teacher_disagreement_score":0.039417088,"about_ca_system_score_codex":0.0011388757,"about_ca_system_score_gemma":0.0005003011,"threshold_uncertainty_score":0.05622369},"labels":[],"label_agreement":null},{"id":"W4411618020","doi":"10.51847/opihbd5ebu","title":"10.51847/OPiHBd5eBu","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Shunt (medical); Control theory (sociology); Computer science; Medicine; Mathematics; Artificial intelligence; Cardiology","score_opus":0.0035606729027329574,"score_gpt":0.1429091630132592,"score_spread":0.13934849011052625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411618020","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0043484746,0.00093735324,0.011925671,0.0009152008,0.0012239635,0.00016944946,0.001157092,0.0023880347,0.9769347],"genre_scores_gemma":[0.011951675,0.00034809476,0.00325622,0.00032278322,0.00012447487,0.000052375777,0.00062090537,0.00023533445,0.9830881],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99973077,0.000029118079,0.000020312502,0.000078187906,0.000077258046,0.0000644665],"domain_scores_gemma":[0.99942124,0.00013716352,0.00003080502,0.000116429255,0.00020437928,0.00008998801],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00042839357,0.0009933733,0.00050797994,0.0014988019,0.000945893,0.0023254645,0.00086255185,0.0027455622,0.90507776],"category_scores_gemma":[0.00084374304,0.00037286954,0.0004393675,0.0014445392,0.00069193245,0.001625654,0.001360115,0.00093516835,0.8976585],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042504843,0.00025132875,0.0013086334,0.00031703076,0.000027823977,0.00041574345,0.000097924516,0.001148349,0.0097093135,0.007269503,0.1941987,0.7848306],"study_design_scores_gemma":[0.000059417456,0.00009978898,0.0012735041,0.00017703352,0.00002162289,0.0006637036,0.00012508994,0.0032412228,0.003953682,0.0019900315,0.98836875,0.000026054138],"about_ca_topic_score_codex":0.0025589278,"about_ca_topic_score_gemma":0.001840568,"teacher_disagreement_score":0.094922245,"about_ca_system_score_codex":0.0007712509,"about_ca_system_score_gemma":0.00033602156,"threshold_uncertainty_score":0.13539505},"labels":[],"label_agreement":null},{"id":"W4411652026","doi":"10.1016/j.rser.2025.115929","title":"Bridging theory and practice: A comprehensive review of virtual power plant technologies and their real-world applications","year":2025,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; Huawei Technologies (Canada)","funders":"Huawei Technologies","keywords":"Bridging (networking); Computer science","score_opus":0.014433680079467773,"score_gpt":0.2760115330547324,"score_spread":0.26157785297526465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411652026","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000057381112,0.9989281,0.00016997993,0.00028312474,0.00010979011,0.000006196108,0.000015338368,0.0000041869503,0.00042586468],"genre_scores_gemma":[0.00060092454,0.9985417,0.00036684523,0.00023993637,0.0001020468,0.000007837354,0.000018971998,0.0000015963617,0.000120095654],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896026,0.00024450623,0.00016103766,0.00012768903,0.00045316474,0.000053448453],"domain_scores_gemma":[0.99601763,0.0028849607,0.00039171198,0.00006666626,0.000541278,0.0000976938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024479448,0.0010599368,0.0019118614,0.0042817486,0.00035078923,0.0023815574,0.0013950445,0.0019181508,0.004137163],"category_scores_gemma":[0.0046384013,0.00044919466,0.0009369713,0.0058234893,0.00089620764,0.0027598669,0.0013193575,0.0017807048,0.0010884295],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058476897,0.00008536581,0.00017722097,0.06917122,0.00016438647,0.00006689841,0.000105590196,0.00052686455,0.0006568959,0.0076129027,0.022099568,0.8992745],"study_design_scores_gemma":[0.000029323184,0.00015264834,0.0012748379,0.047875598,0.00047747965,0.00047926957,0.0001829828,0.0002509012,0.00037948217,0.005543582,0.943302,0.000051936127],"about_ca_topic_score_codex":0.00207826,"about_ca_topic_score_gemma":0.0052202716,"teacher_disagreement_score":0.0042817486,"about_ca_system_score_codex":0.0011649678,"about_ca_system_score_gemma":0.003979495,"threshold_uncertainty_score":0.0138401985},"labels":[],"label_agreement":null},{"id":"W4411843961","doi":"10.1049/cth2.70033","title":"Guest Editorial: Knowledge‐Based Control and Optimization for Smart Energy Systems","year":2025,"lang":"en","type":"editorial","venue":"IET Control Theory and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Northwestern University; University of California, San Diego; National Science Foundation","keywords":"Control engineering; Computer science; Control (management); Control theory (sociology); Engineering; Artificial intelligence","score_opus":0.0028622739734900987,"score_gpt":0.21156731449802177,"score_spread":0.20870504052453168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411843961","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00012154166,0.011062871,0.0010234683,0.030045485,0.9548983,0.000016932252,0.00009031298,0.00008275634,0.0026583662],"genre_scores_gemma":[0.001304583,0.0063539445,0.00020456387,0.0056090346,0.9798923,0.000014966092,0.000034034205,0.000046374622,0.006540129],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99684674,0.00044643364,0.00030233755,0.0007578631,0.0013925921,0.0002540037],"domain_scores_gemma":[0.98910147,0.005022532,0.000537387,0.00032213726,0.0038629128,0.0011534743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034836363,0.00339643,0.002823296,0.0022948552,0.0016584955,0.006678313,0.0027642446,0.008142339,0.019482838],"category_scores_gemma":[0.012231356,0.0007061532,0.0024278332,0.001008161,0.0019243876,0.003451853,0.0013001227,0.012244123,0.0102887135],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008867169,0.00002732071,0.000053843272,0.00040939366,0.000036679074,0.00014136883,0.000016552052,0.0002677635,0.00015522672,0.0020391804,0.98720455,0.009559306],"study_design_scores_gemma":[0.000103343875,0.00010528099,0.00035699518,0.00037211244,0.000075540236,0.0003652332,0.00004268219,0.0018555095,0.0004014258,0.0065914085,0.98969346,0.00003694153],"about_ca_topic_score_codex":0.00055526,"about_ca_topic_score_gemma":0.00080094754,"teacher_disagreement_score":0.019482838,"about_ca_system_score_codex":0.0019503819,"about_ca_system_score_gemma":0.0015743431,"threshold_uncertainty_score":0.065176606},"labels":[],"label_agreement":null},{"id":"W4411943015","doi":"10.1080/19401493.2025.2524379","title":"Development of a contextual bandits-based thermal mass preconditioning algorithm for dynamic electricity pricing","year":2025,"lang":"en","type":"article","venue":"Journal of Building Performance Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Thermal; Dynamic pricing; Electricity; Computer science; Mathematical optimization; Algorithm; Environmental science; Meteorology; Economics; Mathematics; Engineering; Physics; Microeconomics; Electrical engineering","score_opus":0.00840976397016027,"score_gpt":0.25266414608827537,"score_spread":0.2442543821181151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411943015","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030805843,0.00007725246,0.96449906,0.00008560957,0.000039064682,0.000055468867,0.000040529132,0.00077105436,0.0036262134],"genre_scores_gemma":[0.64416665,0.00008651839,0.35218164,0.00009615845,0.0000366781,0.00017129333,0.00015405372,0.00026611052,0.0028408356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999819,0.00004233192,0.000010795283,0.000035871995,0.00005799656,0.000033973254],"domain_scores_gemma":[0.9996867,0.00012648,0.000038644364,0.0000349203,0.00009046776,0.00002282833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037443225,0.00055037235,0.00046195075,0.00023636645,0.00033820246,0.0005532704,0.0007305013,0.0005635781,0.0036801118],"category_scores_gemma":[0.0016268766,0.00027373107,0.0003730971,0.00020931511,0.00037403355,0.00048051932,0.0007098097,0.0008737889,0.0005630653],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006715002,0.000036021396,0.00060242304,0.00002378831,0.00001496276,0.000030514542,0.000039590635,0.94413126,0.0036446112,0.0052972194,0.00061189994,0.04550053],"study_design_scores_gemma":[0.0000043011787,0.000007769407,0.000039499828,0.000001896393,0.0000016542652,0.0000028529437,0.0000029797995,0.99856985,0.00059718743,0.0004965836,0.00027370112,0.0000016360032],"about_ca_topic_score_codex":0.0075709117,"about_ca_topic_score_gemma":0.0080862,"teacher_disagreement_score":0.0075709117,"about_ca_system_score_codex":0.00049490575,"about_ca_system_score_gemma":0.0012082579,"threshold_uncertainty_score":0.0150536895},"labels":[],"label_agreement":null},{"id":"W4412470246","doi":"10.1016/j.engappai.2025.111650","title":"Deep reinforcement learning approach for hybrid renewable energy systems optimization","year":2025,"lang":"en","type":"article","venue":"Engineering Applications of Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Reinforcement learning; Renewable energy; Artificial intelligence; Machine learning; Electrical engineering","score_opus":0.011187001591868525,"score_gpt":0.2170787683279472,"score_spread":0.20589176673607867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412470246","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04235256,0.0010374488,0.94902074,0.0003934999,0.000080143895,0.0000634829,0.000066982655,0.00045711087,0.0065279994],"genre_scores_gemma":[0.937625,0.00030011745,0.05846323,0.00015695447,0.0000378129,0.00016306045,0.00010844095,0.000037712674,0.0031076916],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997509,0.000087784545,0.000013189255,0.000038022255,0.00006377496,0.000046307185],"domain_scores_gemma":[0.9994004,0.00038279372,0.000058619957,0.000020897764,0.000107784785,0.00002950319],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008148891,0.0008712075,0.0009947778,0.00041696485,0.0002480205,0.00068503973,0.0008300609,0.0008268527,0.0018617513],"category_scores_gemma":[0.0014544161,0.00036468028,0.000525665,0.00035215312,0.00048108742,0.00039984382,0.0008391324,0.0011631353,0.00020741724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013019446,0.000015397247,0.0002328715,0.000020284942,0.000016250688,0.000021909544,0.000008516428,0.98907566,0.00021660022,0.0011735932,0.00016208999,0.009043844],"study_design_scores_gemma":[0.0000021936764,0.000007186315,0.000024777293,0.0000017592625,0.0000014786008,0.0000015429584,0.0000013448915,0.9994541,0.000037233916,0.00039529448,0.000072306386,8.230406e-7],"about_ca_topic_score_codex":0.009340889,"about_ca_topic_score_gemma":0.0070797196,"teacher_disagreement_score":0.009340889,"about_ca_system_score_codex":0.0008558448,"about_ca_system_score_gemma":0.0010489209,"threshold_uncertainty_score":0.018573046},"labels":[],"label_agreement":null},{"id":"W4412658020","doi":"10.1016/j.enbuild.2025.116195","title":"Large-scale load profiling for energy flexibility in residential buildings: A data-driven approach for load aggregation through representative clusters","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo; Université de Sherbrooke; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Profiling (computer programming); Flexibility (engineering); Computer science; Scale (ratio); Environmental science; Geography; Statistics; Cartography; Mathematics; Operating system","score_opus":0.02177030608279975,"score_gpt":0.2795299699470222,"score_spread":0.2577596638642225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412658020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12148477,0.00007697162,0.8754597,0.000117057505,0.0000124457365,0.00012230958,0.00036713437,0.0003966396,0.0019630168],"genre_scores_gemma":[0.8859042,0.000048191127,0.11281602,0.000025353947,0.000013448363,0.000107519765,0.00045694638,0.00004628387,0.00058208255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999561,0.00016371539,0.000018827854,0.00010308468,0.00010992276,0.000043333537],"domain_scores_gemma":[0.9988073,0.00060089614,0.00015001136,0.000219028,0.00016593757,0.00005682094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080716546,0.0006753081,0.0006944931,0.0009007002,0.0005017581,0.00089323457,0.0009080804,0.00046892668,0.00065607356],"category_scores_gemma":[0.0032823419,0.00046777775,0.00063824514,0.0011453028,0.0003383787,0.0007634923,0.00070867053,0.0006115708,0.00013057118],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038460556,0.00003476146,0.0034222195,0.000018255134,0.000028655966,0.000053573425,0.000069702604,0.9779508,0.0011364442,0.003320594,0.00023552557,0.013690948],"study_design_scores_gemma":[0.0000016555377,0.000007900336,0.0005679342,0.0000018135403,0.0000024555177,0.000008814285,0.000020106565,0.9973642,0.0003888763,0.001468439,0.00016324113,0.000004646636],"about_ca_topic_score_codex":0.013015038,"about_ca_topic_score_gemma":0.014311332,"teacher_disagreement_score":0.013015038,"about_ca_system_score_codex":0.0009632816,"about_ca_system_score_gemma":0.0007457227,"threshold_uncertainty_score":0.025878549},"labels":[],"label_agreement":null},{"id":"W4412718299","doi":"10.1007/978-981-96-5238-9_40","title":"Optimizing Industrial Energy Management: Employing Machine Learning and Data Analytics for Sustainable Practices","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Sustainable energy; Analytics; Data analysis; Computer science; Data science; Energy (signal processing); Energy management; Manufacturing engineering; Knowledge management; Engineering management; Engineering; Data mining; Renewable energy; Electrical engineering; Physics","score_opus":0.036629290095339356,"score_gpt":0.2534628650138879,"score_spread":0.21683357491854852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412718299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025106259,0.015788762,0.87800175,0.005719082,0.00034856377,0.000076026234,0.00036326222,0.0018288943,0.07276743],"genre_scores_gemma":[0.51554894,0.030002521,0.42360076,0.0006201676,0.0006464208,0.00011423518,0.0007764088,0.00058371417,0.028106797],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950755,0.00010925835,0.000027946846,0.00007259299,0.000252686,0.000029904886],"domain_scores_gemma":[0.99932337,0.00041930217,0.00006184993,0.00008598182,0.00009428452,0.000015300962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007458936,0.0008720131,0.00063144893,0.00076714257,0.00024171997,0.0029946764,0.0007133081,0.0007242724,0.0022000629],"category_scores_gemma":[0.001990475,0.00032593732,0.00042112483,0.0020009752,0.0005799438,0.0029729062,0.00069865334,0.0013020552,0.0011153803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043180255,0.00017034398,0.0021531375,0.00031975494,0.00008285941,0.00004692947,0.00009334659,0.18418975,0.0033500206,0.08045326,0.014591995,0.7145055],"study_design_scores_gemma":[0.000009259494,0.000066720124,0.0015218644,0.00024107656,0.000035973902,0.000045863286,0.00013942279,0.6525636,0.006470892,0.28853494,0.0503418,0.000028663231],"about_ca_topic_score_codex":0.0016609376,"about_ca_topic_score_gemma":0.003052948,"teacher_disagreement_score":0.0029946764,"about_ca_system_score_codex":0.0008365884,"about_ca_system_score_gemma":0.0011766758,"threshold_uncertainty_score":0.0073599815},"labels":[],"label_agreement":null},{"id":"W4412860334","doi":"10.1016/j.apenergy.2025.126465","title":"Comparison of machine learning and MPC methods for control of home battery storage systems in distribution grids","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Mitacs","keywords":"Battery (electricity); Control (management); Battery storage; Model predictive control; Computer science; Control engineering; Engineering; Control theory (sociology); Artificial intelligence; Thermodynamics; Power (physics); Physics","score_opus":0.008306682692800882,"score_gpt":0.26951164954010165,"score_spread":0.26120496684730077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412860334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11164182,0.0035180491,0.8675023,0.00042023958,0.00014717609,0.00015964328,0.000111864276,0.0016141695,0.0148847345],"genre_scores_gemma":[0.93317866,0.00084327155,0.063511804,0.000050716295,0.00003521018,0.00010760545,0.00009325558,0.00006489349,0.00211455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943,0.00020272733,0.00003211493,0.000064735636,0.00023807427,0.000032280095],"domain_scores_gemma":[0.9991284,0.0005294256,0.0000695673,0.00008938336,0.00016289015,0.000020342433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009846644,0.0006833718,0.0007102289,0.0005049266,0.00022910681,0.0005879606,0.0006866192,0.00059472444,0.0012510028],"category_scores_gemma":[0.0017332508,0.00016849813,0.00037095926,0.0005336967,0.00030346602,0.00059316686,0.00039544565,0.00063651684,0.00016735487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087897635,0.000052929317,0.00041110255,0.00014789568,0.000045510806,0.00001896771,0.000022501354,0.9167924,0.000977596,0.0023283493,0.00030655277,0.07880839],"study_design_scores_gemma":[0.000010532644,0.000041193616,0.00026873013,0.0000074561804,0.0000066465245,0.0000057843617,0.0000061135192,0.99798775,0.00071244506,0.00057195494,0.00037826702,0.0000031378147],"about_ca_topic_score_codex":0.0049568117,"about_ca_topic_score_gemma":0.0037929653,"teacher_disagreement_score":0.0049568117,"about_ca_system_score_codex":0.0006703093,"about_ca_system_score_gemma":0.00065470004,"threshold_uncertainty_score":0.009855926},"labels":[],"label_agreement":null},{"id":"W4412861358","doi":"10.2139/ssrn.5377029","title":"Mcd-Nilm: A Multi-Scale Clustering and Decoding Approach for Appliance and Ev Energy Disaggregation","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Decoding methods; Scale (ratio); Energy (signal processing); Computer science; Artificial intelligence; Algorithm; Mathematics; Geography; Statistics; Cartography","score_opus":0.010957519582973087,"score_gpt":0.226238455948142,"score_spread":0.2152809363651689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412861358","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023049535,0.000109809866,0.99448884,0.0001297033,0.000075093005,0.00005261419,0.00036782102,0.0016757615,0.0007953561],"genre_scores_gemma":[0.07962265,0.00011188955,0.9134827,0.00019291491,0.000093832365,0.00018496884,0.0017518905,0.00073512824,0.00382404],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851567,0.0005807088,0.00007903798,0.0002887945,0.0004156664,0.00012018281],"domain_scores_gemma":[0.99774396,0.0009250222,0.0000971892,0.0004711927,0.0006642215,0.000098466306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019113582,0.0012400948,0.002063904,0.0018827725,0.0014847387,0.0017725916,0.0028845377,0.002172421,0.006099117],"category_scores_gemma":[0.00792427,0.000869355,0.0015311299,0.0028546727,0.0006361515,0.0018642695,0.0029424392,0.002370662,0.0029080291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030924272,0.0001829701,0.0011205308,0.0002757942,0.00021408475,0.0001230048,0.00027905463,0.46181318,0.004680311,0.01916117,0.01935409,0.4924866],"study_design_scores_gemma":[0.000012745464,0.000012749208,0.00013264282,0.000007768895,0.000008223967,0.000018316223,0.000027821612,0.9876676,0.0007658697,0.009299875,0.0020359398,0.000010368424],"about_ca_topic_score_codex":0.012465628,"about_ca_topic_score_gemma":0.020372227,"teacher_disagreement_score":0.012465628,"about_ca_system_score_codex":0.001034318,"about_ca_system_score_gemma":0.001986058,"threshold_uncertainty_score":0.024786115},"labels":[],"label_agreement":null},{"id":"W4412867174","doi":"10.1016/j.ijpe.2025.109696","title":"Optimal hour-ahead commitment and storage decisions of wind power producers","year":2025,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Business; Environmental economics; Wind power; Power (physics); Operations research; Operations management; Computer science; Environmental science; Microeconomics; Economics; Mathematics; Electrical engineering","score_opus":0.010963604441312632,"score_gpt":0.2331485780717375,"score_spread":0.22218497363042486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412867174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8809822,0.00038868692,0.09841107,0.002308075,0.00020949668,0.00021746616,0.00078731024,0.00021933737,0.016476348],"genre_scores_gemma":[0.99607784,0.000039610728,0.0020161977,0.00002444905,0.0000143617835,0.00001482904,0.00005496668,0.000012000966,0.0017457892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994941,0.00022549668,0.000026938393,0.00008945915,0.000060746217,0.00010326807],"domain_scores_gemma":[0.99781716,0.0015243759,0.0002003541,0.000059981914,0.00019509235,0.00020314507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00146049,0.00058519875,0.0011501543,0.00041173658,0.0004967339,0.0016951881,0.0008119742,0.001595938,0.005603648],"category_scores_gemma":[0.004141899,0.0011561624,0.00039980456,0.0004600065,0.0005403692,0.0016255938,0.0005556208,0.0012780811,0.00038925488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064662274,0.00009929468,0.001229563,0.000051834315,0.000047794467,0.00018610492,0.00006128287,0.9837533,0.0016280802,0.004186672,0.0009803964,0.0071290885],"study_design_scores_gemma":[0.00004461599,0.00007478024,0.0011799663,0.000007921809,0.000014548333,0.000013645639,0.0000779079,0.9943538,0.00070115575,0.0033559387,0.00016302399,0.000012877301],"about_ca_topic_score_codex":0.0043245056,"about_ca_topic_score_gemma":0.0062126634,"teacher_disagreement_score":0.005603648,"about_ca_system_score_codex":0.0008142634,"about_ca_system_score_gemma":0.001143875,"threshold_uncertainty_score":0.018746018},"labels":[],"label_agreement":null},{"id":"W4412920094","doi":"10.3390/su17156767","title":"A Two-Stage Sustainable Optimal Scheduling Strategy for Multi-Contract Collaborative Distributed Resource Aggregators","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Agriculture","funders":"National Natural Science Foundation of China","keywords":"Scheduling (production processes); Computer science; Environmental economics; Distributed computing; Business; Operations research; Resource (disambiguation); Process management; Industrial organization; Computer network; Operations management; Engineering; Economics","score_opus":0.010480225066979284,"score_gpt":0.2809537510801063,"score_spread":0.270473526013127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412920094","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06576828,0.000061748324,0.92536515,0.0002007938,0.000029111514,0.00013501474,0.000038220118,0.00018480147,0.008216987],"genre_scores_gemma":[0.944659,0.000033541997,0.052679267,0.000030051084,0.000009786276,0.00009012519,0.00003457526,0.0000192603,0.0024443744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994609,0.00015929382,0.000025290865,0.0001019426,0.00015286315,0.000099795485],"domain_scores_gemma":[0.9995758,0.00011316979,0.000082355626,0.000054788525,0.000096453325,0.00007754486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010858239,0.0005703056,0.00061158655,0.00030803954,0.00069654756,0.00093931943,0.0012404533,0.00071316096,0.0026853315],"category_scores_gemma":[0.0011946805,0.00031831136,0.0004863275,0.00037672155,0.00041520968,0.0010666699,0.0011180073,0.0005967296,0.00025569298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011052479,0.000058440874,0.00038289258,0.00002022444,0.000019012698,0.000111997,0.00007055174,0.9607206,0.002495277,0.013537894,0.00060833147,0.02186423],"study_design_scores_gemma":[0.0000075838443,0.000029461815,0.0000611422,0.0000011477267,0.0000026026441,0.000010583873,0.000013115872,0.9973328,0.00034989257,0.0018960861,0.00029205778,0.000003458851],"about_ca_topic_score_codex":0.0043437365,"about_ca_topic_score_gemma":0.0037971514,"teacher_disagreement_score":0.0043437365,"about_ca_system_score_codex":0.0008781391,"about_ca_system_score_gemma":0.0014895294,"threshold_uncertainty_score":0.008983374},"labels":[],"label_agreement":null},{"id":"W4412927139","doi":"10.21203/rs.3.rs-6289250/v1","title":"Three-Stage Optimization Model for Operation of Islanded Local Energy Network with Electric Vehicle Charging Station","year":2025,"lang":"","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Stage (stratigraphy); Charging station; Electric vehicle; Energy (signal processing); Automotive engineering; Computer science; Environmental science; Engineering; Physics; Geology; Power (physics)","score_opus":0.034152677446661735,"score_gpt":0.3067766174033636,"score_spread":0.27262393995670187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412927139","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.119475864,0.00094241917,0.80730414,0.000992669,0.00022993782,0.00038475773,0.0009977777,0.0005871078,0.069085225],"genre_scores_gemma":[0.96113354,0.00025325053,0.0144533655,0.000077971505,0.000030648265,0.00026003565,0.00026661382,0.00007060737,0.023454076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995716,0.0001301601,0.000012646755,0.00008467087,0.000081820755,0.00011902329],"domain_scores_gemma":[0.9996873,0.0001401094,0.000035601046,0.000015589223,0.000091951035,0.00002932263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079425,0.0011339043,0.001581799,0.00045028556,0.00083316205,0.0019513441,0.0021763283,0.0025491768,0.010016483],"category_scores_gemma":[0.0008976105,0.0008929099,0.0012961229,0.00068087154,0.0006850404,0.001159846,0.0010164609,0.0015354136,0.00070103846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032036525,0.000013819296,0.00011619532,0.000024735802,0.000010584887,0.00005643924,0.000013777712,0.99649376,0.00030408977,0.0013106545,0.00025834926,0.0013655126],"study_design_scores_gemma":[0.00000544349,0.000013818622,0.000062643274,0.0000022183483,0.000005193065,0.0000045487395,0.0000066085818,0.99939156,0.00007709482,0.0003130689,0.00011544025,0.0000023500606],"about_ca_topic_score_codex":0.03184279,"about_ca_topic_score_gemma":0.024575114,"teacher_disagreement_score":0.03184279,"about_ca_system_score_codex":0.0017388246,"about_ca_system_score_gemma":0.0014696192,"threshold_uncertainty_score":0.063314915},"labels":[],"label_agreement":null},{"id":"W4412964113","doi":"10.1016/j.apenergy.2025.126449","title":"Incorporating financial entities into spot electricity market with renewable energy via holistic risk-aware bilevel optimization","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Science Foundation of Guangdong Province; Queen's University; National Natural Science Foundation of China; Queen's University Belfast","keywords":"Bilevel optimization; Business; Renewable energy; Electricity; Spot market; Environmental economics; Finance; Computer science; Economics; Engineering; Optimization problem; Electrical engineering","score_opus":0.004301386135943405,"score_gpt":0.17162538190238108,"score_spread":0.16732399576643767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412964113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12942417,0.00045788952,0.8518484,0.0009045676,0.00013164323,0.000056191613,0.00009401185,0.00021365708,0.016869452],"genre_scores_gemma":[0.9749442,0.00013757413,0.020886902,0.00007839904,0.000032262287,0.00003866913,0.000049214665,0.00004418302,0.0037886053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994777,0.0002224981,0.000017871856,0.00008421365,0.00009990048,0.00009785413],"domain_scores_gemma":[0.9993261,0.00035921513,0.00008767012,0.000041804877,0.00011964449,0.00006566728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010300218,0.00086096424,0.0014369984,0.00035602483,0.00042850716,0.0026077565,0.0009808952,0.0016876728,0.0031927514],"category_scores_gemma":[0.0031002362,0.00065540266,0.0007242623,0.00055889314,0.0007471627,0.0025398193,0.0016784158,0.0015659119,0.00027848463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020777805,0.000023537243,0.00023244807,0.000011457382,0.000018625566,0.000046470952,0.00001128497,0.9887255,0.00018182406,0.007955344,0.00017178594,0.002601053],"study_design_scores_gemma":[0.0000020678253,0.000005422993,0.000017032024,0.0000010978692,0.0000025820814,0.0000029530506,0.000003973006,0.99764156,0.00002669204,0.0022438949,0.000051383275,0.000001352894],"about_ca_topic_score_codex":0.0041831555,"about_ca_topic_score_gemma":0.00403162,"teacher_disagreement_score":0.0041831555,"about_ca_system_score_codex":0.00064139714,"about_ca_system_score_gemma":0.0012618509,"threshold_uncertainty_score":0.010680795},"labels":[],"label_agreement":null},{"id":"W4413056564","doi":"10.1007/978-981-96-7036-9_13","title":"Behavior-Driven Data Augmentation for Non-Intrusive Load Monitoring","year":2025,"lang":"en","type":"book-chapter","venue":"Communications in computer and information science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science","score_opus":0.05354484732171682,"score_gpt":0.3133949376341959,"score_spread":0.2598500903124791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413056564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029313143,0.0005956974,0.9569312,0.00014424705,0.0002464325,0.000079029785,0.00034232187,0.007278986,0.0050688917],"genre_scores_gemma":[0.6943185,0.00047291422,0.29423693,0.00021987292,0.00013918591,0.00013844324,0.00076658546,0.00054381735,0.009163722],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997557,0.00003652379,0.000010849909,0.00006608698,0.00010738327,0.000023494165],"domain_scores_gemma":[0.99952126,0.00018329543,0.000046197532,0.00012267978,0.000108758766,0.000017751045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002669659,0.0005906657,0.0004724478,0.00032916025,0.00019042095,0.00048626444,0.0009329106,0.00029611375,0.002738619],"category_scores_gemma":[0.0010148189,0.00023479667,0.0002725215,0.00039001208,0.00023438687,0.0007130832,0.0005969085,0.00069807435,0.0010042724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050976494,0.00038331552,0.001933163,0.00017725621,0.00005001057,0.00013072534,0.00012528275,0.08159298,0.12383767,0.0046433797,0.010240251,0.7763762],"study_design_scores_gemma":[0.0000071476916,0.00009355314,0.0013186767,0.000017207607,0.00001332374,0.000112185,0.000018594113,0.9531285,0.036605306,0.003355367,0.005313599,0.000016534826],"about_ca_topic_score_codex":0.0009090945,"about_ca_topic_score_gemma":0.0018286112,"teacher_disagreement_score":0.002738619,"about_ca_system_score_codex":0.00025916912,"about_ca_system_score_gemma":0.00023711633,"threshold_uncertainty_score":0.0091615915},"labels":[],"label_agreement":null},{"id":"W4413109701","doi":"10.1016/j.buildenv.2025.113543","title":"Energy remuneration mechanisms for renewable energy communities: Insights from a mixed-use district","year":2025,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Ministry of Science and Technology, Taiwan; Concordia University; Ministero dell'Istruzione e del Merito; Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Remuneration; Energy (signal processing); Environmental economics; Business; Natural resource economics; Environmental science; Engineering; Economics; Electrical engineering; Finance","score_opus":0.008433654937225425,"score_gpt":0.17141142023764863,"score_spread":0.1629777653004232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413109701","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.994392,0.000022548855,0.00046839603,0.000063399726,7.731299e-7,0.000019133937,0.0001244705,0.0000071737613,0.0049021617],"genre_scores_gemma":[0.9984059,0.000022147102,0.00023583462,0.0000044031476,4.770007e-7,0.000004921036,0.00006448627,0.0000046347423,0.0012572994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.99966085,0.00010824888,0.000007895845,0.000036092508,0.00007834575,0.000108694214],"domain_scores_gemma":[0.999605,0.00014891269,0.0000410316,0.00003525244,0.00010517421,0.000064587366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029528295,0.00015376284,0.0002208027,0.0003547154,0.0008011826,0.0013430313,0.0008164572,0.00035565556,0.0024410891],"category_scores_gemma":[0.0008458723,0.0001400966,0.00021004646,0.0009522502,0.00058296695,0.00060578494,0.0006982733,0.00025389966,0.00022978413],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011554245,0.0013137346,0.4022283,0.00029488286,0.00015124439,0.0048424313,0.0073112887,0.45658728,0.01041507,0.05392339,0.0051639597,0.056613017],"study_design_scores_gemma":[0.0001361899,0.0004745274,0.3237526,0.000047104768,0.00009829871,0.00036139548,0.038600672,0.60866386,0.0036184983,0.0063335425,0.017809076,0.000104141254],"about_ca_topic_score_codex":0.36149848,"about_ca_topic_score_gemma":0.58592117,"teacher_disagreement_score":0.36149848,"about_ca_system_score_codex":0.0060524996,"about_ca_system_score_gemma":0.0017546345,"threshold_uncertainty_score":0.7187886},"labels":[],"label_agreement":null},{"id":"W4413147979","doi":"10.1016/j.energy.2025.137771","title":"Energy scheduling and economic assessment of a rural microgrid using two-stage stochastic framework","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Department of Science and Technology, Ministry of Science and Technology, India","keywords":"Microgrid; Stage (stratigraphy); Scheduling (production processes); Environmental economics; Computer science; Energy (signal processing); Operations research; Mathematical optimization; Reliability engineering; Economics; Environmental science; Operations management; Engineering; Renewable energy; Mathematics; Electrical engineering; Statistics; Geology","score_opus":0.00728471862434656,"score_gpt":0.25208406974027636,"score_spread":0.2447993511159298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413147979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72742534,0.00052355736,0.25334325,0.001146318,0.00010096139,0.00020594633,0.0010599742,0.00028184807,0.015912868],"genre_scores_gemma":[0.99171466,0.000106519285,0.00423908,0.000029070476,0.000019486306,0.00004178761,0.00012281007,0.000020847778,0.0037056499],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937916,0.0003069954,0.00001501029,0.00009397021,0.00006010154,0.00014478],"domain_scores_gemma":[0.998884,0.0006565644,0.00015221126,0.00003836253,0.00015603304,0.00011294101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015013953,0.0010126072,0.001712925,0.0005514867,0.00052429043,0.0013949694,0.0014464546,0.0015930518,0.0035077843],"category_scores_gemma":[0.0021388473,0.00084747287,0.001037524,0.00084607094,0.0008366645,0.0011138624,0.0010114431,0.0010080381,0.00020777351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052641957,0.00001625254,0.00018198413,0.000009564448,0.000008664242,0.0000336832,0.0000043038617,0.99781215,0.00014411556,0.0013032396,0.000072588206,0.00036087984],"study_design_scores_gemma":[0.000008417801,0.00001956718,0.0001125862,6.903495e-7,0.000004516777,0.0000033049007,0.0000067559445,0.999403,0.00002984108,0.00037767531,0.0000311129,0.0000025775512],"about_ca_topic_score_codex":0.028923554,"about_ca_topic_score_gemma":0.017363138,"teacher_disagreement_score":0.028923554,"about_ca_system_score_codex":0.0015375724,"about_ca_system_score_gemma":0.0015877397,"threshold_uncertainty_score":0.057510376},"labels":[],"label_agreement":null},{"id":"W4413210078","doi":"10.1016/j.segan.2025.101904","title":"A distributionally robust optimization strategy for virtual bidding in two-settlement electricity markets","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"Mitacs; Hydro-Québec","keywords":"Bidding; Settlement (finance); Robust optimization; Electricity; Economics; Microeconomics; Industrial organization; Business; Computer science; Operations research; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Finance","score_opus":0.004654667273753046,"score_gpt":0.21035373791522308,"score_spread":0.20569907064147003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413210078","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019807342,0.00009639288,0.9727278,0.00033692407,0.00005364427,0.00005748131,0.000040719515,0.0001610525,0.006718747],"genre_scores_gemma":[0.93717414,0.000077766206,0.05789291,0.00012235228,0.0000425862,0.00009035555,0.0000574073,0.00009364324,0.004448864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990459,0.00049278454,0.000040852672,0.00011778778,0.00017780827,0.0001248057],"domain_scores_gemma":[0.9984137,0.0009715145,0.00012585576,0.0001059359,0.00027790922,0.00010507742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024405096,0.0009957223,0.0015223077,0.00040746122,0.0004781614,0.0015406837,0.0015942476,0.0013548519,0.0044486583],"category_scores_gemma":[0.0054746023,0.00058197713,0.00059885567,0.0004674824,0.0010021877,0.0015348888,0.0017722541,0.0012051665,0.0005281767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016098593,0.00006125869,0.000119098295,0.00004588304,0.000032193257,0.00006588948,0.000030024503,0.9506709,0.0013715382,0.02810751,0.0013037225,0.018030979],"study_design_scores_gemma":[0.000008732215,0.000022250186,0.000018714141,0.0000016802715,0.000002485657,0.0000074194704,0.0000038034916,0.9952899,0.000100566474,0.004448563,0.0000929352,0.0000029495081],"about_ca_topic_score_codex":0.0017848255,"about_ca_topic_score_gemma":0.0014627826,"teacher_disagreement_score":0.0044486583,"about_ca_system_score_codex":0.00084821286,"about_ca_system_score_gemma":0.0010225406,"threshold_uncertainty_score":0.014882207},"labels":[],"label_agreement":null},{"id":"W4413295305","doi":"10.1016/j.energy.2025.137976","title":"Enhancing fairness and efficiency in community energy systems: A forecast-driven approach","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Environmental economics; Efficient energy use; Energy (signal processing); Business; Computer science; Environmental science; Economics; Engineering; Mathematics; Statistics","score_opus":0.007769539734633219,"score_gpt":0.19257514639087964,"score_spread":0.18480560665624643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413295305","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074252,0.00022758236,0.92020214,0.0006468612,0.00006866722,0.000088883,0.000044468874,0.00025161132,0.0042178477],"genre_scores_gemma":[0.96068126,0.00007641765,0.038130075,0.000060321185,0.000048886868,0.0000561924,0.000023095605,0.000029353792,0.00089440774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99786466,0.0010096083,0.00007287483,0.00036783045,0.0004342151,0.00025084874],"domain_scores_gemma":[0.9941248,0.003646391,0.0005391682,0.0005990852,0.00073098973,0.00035956103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004886034,0.0007874622,0.0010375861,0.00078126555,0.0012383979,0.0018807505,0.0020332683,0.0011468355,0.001734166],"category_scores_gemma":[0.013120623,0.00033963207,0.0005936394,0.00069959246,0.0010566864,0.0030069635,0.0025434121,0.0011960235,0.00017766618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000258983,0.00022784267,0.0027625195,0.000083747196,0.000083580126,0.00016020768,0.0004094372,0.8597706,0.0031331924,0.06705715,0.0009526317,0.06510009],"study_design_scores_gemma":[0.000013268224,0.000035419438,0.00020031432,0.000005340416,0.000010203708,0.000017658931,0.000055915785,0.9664904,0.00051272544,0.03218084,0.0004663699,0.0000114803925],"about_ca_topic_score_codex":0.00404414,"about_ca_topic_score_gemma":0.0032997597,"teacher_disagreement_score":0.004886034,"about_ca_system_score_codex":0.0017378292,"about_ca_system_score_gemma":0.0020378297,"threshold_uncertainty_score":0.025840104},"labels":[],"label_agreement":null},{"id":"W4413359292","doi":"10.1109/tsg.2025.3600714","title":"A Hybrid Imitation–Reinforcement Learning Framework for Optimal Operation of Soft Open Points in Unbalanced Distribution Networks","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reinforcement learning; Imitation; Computer science; Reinforcement; Artificial intelligence; Control theory (sociology); Mathematical optimization; Engineering; Mathematics; Structural engineering; Control (management); Psychology","score_opus":0.011150811118158164,"score_gpt":0.25081233727835095,"score_spread":0.2396615261601928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413359292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007258347,0.00014389753,0.99041957,0.000093405,0.000021851341,0.000020281166,0.000009295503,0.00016759879,0.0018657071],"genre_scores_gemma":[0.919517,0.00020747159,0.07685469,0.000058076384,0.00004590458,0.00011642575,0.000031560918,0.00005331152,0.0031156316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972445,0.00009682768,0.000013792543,0.00004476923,0.000080045014,0.0000399867],"domain_scores_gemma":[0.99962187,0.00019555858,0.00005591808,0.000020561953,0.00007808193,0.0000280906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091022474,0.0008532977,0.00088333414,0.00035414792,0.0003129525,0.0006589203,0.0012657649,0.0008069336,0.0013347924],"category_scores_gemma":[0.0012577872,0.0003927209,0.0004769619,0.0002407092,0.0010094792,0.00067660975,0.00075228175,0.00091061817,0.00019213259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011347895,0.000007522314,0.00011725688,0.00001580957,0.000009493411,0.000029050807,0.000019589203,0.9876659,0.0004502164,0.004982472,0.0001312739,0.0065600537],"study_design_scores_gemma":[0.0000021753247,0.000006815862,0.0000137628,0.0000012780442,0.0000013427333,0.0000029526743,0.000001198878,0.99912626,0.00005936009,0.0006857534,0.0000977425,0.0000013833074],"about_ca_topic_score_codex":0.0074821813,"about_ca_topic_score_gemma":0.0047376524,"teacher_disagreement_score":0.0074821813,"about_ca_system_score_codex":0.0007360346,"about_ca_system_score_gemma":0.0009149785,"threshold_uncertainty_score":0.01487726},"labels":[],"label_agreement":null},{"id":"W4413365057","doi":"10.1016/j.enbuild.2025.116327","title":"Building bridges: Unlocking cost savings through peer-to-peer trading between heat prosumers","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Social Sciences and Humanities Research Council of Canada; Natural Sciences and Engineering Research Council of Canada; Canadian Institutes of Health Research; Alliance de recherche numérique du Canada","keywords":"Peer-to-peer; Business; Environmental economics; Industrial organization; Computer science; Economics; Computer network","score_opus":0.011840994540209579,"score_gpt":0.24359902841113842,"score_spread":0.23175803387092886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413365057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35713822,0.0009691896,0.6125766,0.0006209759,0.00016314012,0.00015735545,0.0001428748,0.0006614558,0.027570156],"genre_scores_gemma":[0.9837616,0.00011900778,0.014608343,0.000039688766,0.000012574313,0.000033512762,0.000023839197,0.00002229338,0.001379096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996107,0.00013824018,0.000010202942,0.00008809896,0.00008503827,0.00006764194],"domain_scores_gemma":[0.99960214,0.00021628641,0.000048275488,0.00004422941,0.00004346462,0.000045599427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064193894,0.00064084353,0.00058196933,0.00020481895,0.00043814062,0.0011334151,0.0012190221,0.00081914256,0.00505726],"category_scores_gemma":[0.0013141738,0.0002850947,0.00040354618,0.00030001052,0.00052472536,0.0019108433,0.001306381,0.0006648749,0.00036457076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004025389,0.00026624015,0.0015208083,0.00023271827,0.00008860908,0.00045267338,0.00016288365,0.83672,0.014294596,0.045426663,0.0025152457,0.097917035],"study_design_scores_gemma":[0.000024406678,0.00014091791,0.00028250704,0.000009388933,0.000025712001,0.00005800841,0.00006383974,0.98106927,0.0019880144,0.014487548,0.0018361849,0.0000142299905],"about_ca_topic_score_codex":0.0014153612,"about_ca_topic_score_gemma":0.002063632,"teacher_disagreement_score":0.00505726,"about_ca_system_score_codex":0.00040189555,"about_ca_system_score_gemma":0.0005786968,"threshold_uncertainty_score":0.016918182},"labels":[],"label_agreement":null},{"id":"W441340","doi":"10.15173/esr.v14i2.494","title":"The Economics of Energy Storage in 14 Deregulated Power Markets","year":2006,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Investment (military); Energy storage; Revenue; Economics; Business; Microeconomics; Monetary economics; Power (physics); Finance","score_opus":0.008632538506956585,"score_gpt":0.20558209658094168,"score_spread":0.1969495580739851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W441340","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96615255,0.0038610727,0.0031162212,0.00047712136,0.000015414786,0.00006255481,0.0003667379,0.000013832467,0.025934333],"genre_scores_gemma":[0.9955291,0.0014066246,0.0007896671,0.000028086959,0.000009062021,0.000018207415,0.000110088076,0.0000026350465,0.0021065474],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933916,0.00028195002,0.00003892248,0.00006899803,0.00018287289,0.000088057895],"domain_scores_gemma":[0.99854505,0.0007841635,0.00036872615,0.000044967357,0.00018884035,0.000068333524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016215282,0.00018241983,0.000437176,0.00093588815,0.00029155987,0.0026831706,0.00055712153,0.0005226999,0.0031469334],"category_scores_gemma":[0.0024616285,0.00020848613,0.00041559146,0.0012742783,0.0007463671,0.0028593089,0.00060763303,0.0002946516,0.00020883509],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004717639,0.000943917,0.078375235,0.0008354443,0.0004241047,0.0024263987,0.0012894413,0.24485338,0.008783766,0.48242563,0.0049277376,0.16999732],"study_design_scores_gemma":[0.0006474777,0.0024561964,0.2077642,0.000536761,0.00040791382,0.001631267,0.008600144,0.4487273,0.010115345,0.26292962,0.05581241,0.00037139273],"about_ca_topic_score_codex":0.0016760756,"about_ca_topic_score_gemma":0.0030547308,"teacher_disagreement_score":0.0031469334,"about_ca_system_score_codex":0.0025046424,"about_ca_system_score_gemma":0.0005137939,"threshold_uncertainty_score":0.018172562},"labels":[],"label_agreement":null},{"id":"W4413468435","doi":"10.1109/icjece.2025.3592219","title":"HEES-Based IFVR for Energy-Saving Application Using DC–DC Converter","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Materials science","score_opus":0.0045311487371022295,"score_gpt":0.1703015567416404,"score_spread":0.16577040800453818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413468435","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18557456,0.002768522,0.6668911,0.0008972869,0.000797123,0.0005011824,0.001066758,0.0118442,0.12965927],"genre_scores_gemma":[0.95980287,0.00048548417,0.022713894,0.00020909368,0.0000709421,0.000066888126,0.00027492052,0.000092619346,0.016283156],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99983406,0.000017921213,0.000010977734,0.000040040464,0.00007087321,0.000026059151],"domain_scores_gemma":[0.9998913,0.000014974105,0.000013999285,0.00003037989,0.000042320207,0.000007076721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001388065,0.00032675586,0.00027959986,0.0004252572,0.0003046066,0.0007081925,0.0007806125,0.0002656818,0.009028385],"category_scores_gemma":[0.0001801745,0.00010520331,0.0001773691,0.00043722353,0.00021450536,0.0006218988,0.00028687267,0.00043596374,0.001894119],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009481368,0.0003271223,0.0017209053,0.000917435,0.00008512281,0.0008359091,0.00030491123,0.022490375,0.42545,0.014765775,0.027961176,0.50419325],"study_design_scores_gemma":[0.00018830369,0.00091724214,0.0051274295,0.00020731936,0.00012122275,0.0019314459,0.00029169332,0.26711297,0.5297695,0.0077144713,0.18652086,0.00009752986],"about_ca_topic_score_codex":0.0006758693,"about_ca_topic_score_gemma":0.0016226078,"teacher_disagreement_score":0.009028385,"about_ca_system_score_codex":0.00029078283,"about_ca_system_score_gemma":0.00019116738,"threshold_uncertainty_score":0.030202925},"labels":[],"label_agreement":null},{"id":"W4413472467","doi":"10.1109/tii.2025.3593846","title":"An Event-Driven Neural Kalman Model for State Representation and Learning-Based Dynamic Scheduling of Industrial Energy System","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Kalman filter; Computer science; Scheduling (production processes); Representation (politics); Artificial neural network; Artificial intelligence; Control engineering; Machine learning; Real-time computing; Engineering","score_opus":0.029346158353718527,"score_gpt":0.2599733360911052,"score_spread":0.23062717773738664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413472467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067817643,0.00020545704,0.98980975,0.00010204117,0.00005069555,0.000034633696,0.000069440386,0.00030801896,0.0026381358],"genre_scores_gemma":[0.93276453,0.0004888895,0.059432887,0.00009481067,0.00005737138,0.00035781806,0.0003390641,0.000045022676,0.00641959],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959975,0.00007312515,0.000029757883,0.00012620368,0.00012216879,0.00004902447],"domain_scores_gemma":[0.9997147,0.00010615997,0.0000564543,0.000020670015,0.000090067835,0.000011890117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006459561,0.0007956367,0.0007821573,0.0003585306,0.00040403174,0.00080992683,0.0012377447,0.00078957283,0.0023728893],"category_scores_gemma":[0.0012612069,0.00044060478,0.0006163459,0.0006024916,0.0005618374,0.0011589648,0.00069580186,0.0013674345,0.00045746897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029947088,0.000020384392,0.00028750044,0.00003741791,0.000015960119,0.000028023062,0.00003096482,0.9753924,0.00087572914,0.0064591034,0.00044392384,0.016378596],"study_design_scores_gemma":[0.000002307451,0.0000067651354,0.000041699444,0.0000015638462,0.0000028202112,0.0000022164018,0.0000014132606,0.99899846,0.00015892158,0.00060588296,0.00017557092,0.0000024058033],"about_ca_topic_score_codex":0.017090106,"about_ca_topic_score_gemma":0.01260755,"teacher_disagreement_score":0.017090106,"about_ca_system_score_codex":0.00094091776,"about_ca_system_score_gemma":0.0012956883,"threshold_uncertainty_score":0.033981264},"labels":[],"label_agreement":null},{"id":"W4413844505","doi":"10.1016/j.epsr.2025.112091","title":"Multi-modal multi-task artificial intelligence model for active distribution network scheduling with multi-agent reinforcement learning","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada; Sultan Qaboos University; His Majesty’s Trust Fund","keywords":"Reinforcement learning; Computer science; Artificial intelligence; Modal; Task (project management); Scheduling (production processes); Machine learning; Engineering; Systems engineering","score_opus":0.05781805628729088,"score_gpt":0.3271675777636495,"score_spread":0.26934952147635866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413844505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041272603,0.00028092862,0.9515407,0.00039443042,0.00008576701,0.00007833753,0.000093714654,0.0002545697,0.0059989565],"genre_scores_gemma":[0.9721042,0.00010178143,0.024159191,0.00006400641,0.000028589593,0.00014333427,0.00005796704,0.000021508255,0.003319392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995229,0.00016891392,0.000022278642,0.00009968583,0.000101193575,0.000085008745],"domain_scores_gemma":[0.99905866,0.00048181557,0.00014248602,0.00003533183,0.00021139138,0.00007031634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011594804,0.00071404804,0.0012132857,0.0004260748,0.00047835906,0.001029107,0.0013717584,0.0011782472,0.0025858334],"category_scores_gemma":[0.0022831594,0.0004328792,0.00059419527,0.00048608604,0.0006694526,0.00073498045,0.0009230104,0.0012509187,0.00030718584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023012482,0.000015512509,0.00008663461,0.000011458361,0.000009954248,0.000019399975,0.000011802261,0.99599326,0.00016574266,0.0013612099,0.0001197389,0.0021822841],"study_design_scores_gemma":[0.000002893459,0.000005242511,0.000017450107,6.294089e-7,0.0000014955241,0.0000012796042,8.8545966e-7,0.9996431,0.00001812089,0.0002818497,0.000026203385,7.7358095e-7],"about_ca_topic_score_codex":0.012570263,"about_ca_topic_score_gemma":0.009256151,"teacher_disagreement_score":0.012570263,"about_ca_system_score_codex":0.0009542706,"about_ca_system_score_gemma":0.0011134524,"threshold_uncertainty_score":0.024994195},"labels":[],"label_agreement":null},{"id":"W4413872150","doi":"10.5267/j.ijiec.2025.6.002","title":"Switch-off policies in job-shop systems including energy price variabilit","year":2025,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Job shop; Environmental economics; Business; Economics; Computer science; Labour economics; Industrial organization; Mathematics; Statistics; Flow shop scheduling; Embedded system; Job shop scheduling","score_opus":0.02159059099406922,"score_gpt":0.2553796295431288,"score_spread":0.2337890385490596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413872150","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6367435,0.00087831833,0.35311976,0.00045689917,0.00020048527,0.00020846377,0.00015532423,0.0007118057,0.007525473],"genre_scores_gemma":[0.9959021,0.000054811735,0.0035032872,0.000022258226,0.000009534039,0.00001740149,0.00001566873,0.000009389755,0.00046546428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991209,0.00031582775,0.000040285362,0.00012289968,0.00015068571,0.00024946104],"domain_scores_gemma":[0.9980769,0.0012005001,0.00026484168,0.0001068921,0.00012480625,0.00022606626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013448155,0.00067811745,0.0007836258,0.0003469331,0.0006829417,0.001183455,0.0009091508,0.000777263,0.0017598262],"category_scores_gemma":[0.0028339888,0.00035102625,0.0004936953,0.00030101155,0.00076564425,0.0007811163,0.0006477593,0.00072826724,0.00015430599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036878866,0.00016558473,0.0017772994,0.000090171474,0.00005058769,0.00032467474,0.00010856878,0.9719987,0.0041095885,0.0076336376,0.0006686937,0.012703804],"study_design_scores_gemma":[0.000021857928,0.0001253526,0.00056032685,0.0000041575076,0.000010284722,0.00003133815,0.000042958207,0.99512887,0.0008356469,0.0029418487,0.0002888976,0.000008395466],"about_ca_topic_score_codex":0.0033091733,"about_ca_topic_score_gemma":0.002120754,"teacher_disagreement_score":0.0033091733,"about_ca_system_score_codex":0.0007399759,"about_ca_system_score_gemma":0.00089324557,"threshold_uncertainty_score":0.0071121454},"labels":[],"label_agreement":null},{"id":"W4413908657","doi":"10.3390/en18174622","title":"Real-Time Energy Management of a Microgrid Using MPC-DDQN-Controlled V2H and H2V Operations with Renewable Energy Integration","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Egg Farmers of Canada","keywords":"Microgrid; Renewable energy; Energy management; Computer science; Intermittent energy source; Energy (signal processing); Distributed generation; Engineering; Electrical engineering; Mathematics","score_opus":0.00398755118681473,"score_gpt":0.1911978517370053,"score_spread":0.18721030055019056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413908657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60439676,0.00026169553,0.37378195,0.00032528615,0.00011278271,0.00018992672,0.00016346903,0.0018996433,0.018868538],"genre_scores_gemma":[0.99688125,0.00001489305,0.0024866972,0.0000075411062,0.0000031472514,0.000012903447,0.000015473272,0.0000057293114,0.0005724249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999279,0.000015833755,0.000003859536,0.000019842393,0.00001810976,0.000014537092],"domain_scores_gemma":[0.9999138,0.000021080265,0.000019653971,0.000008867226,0.000023066785,0.000013455917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022192913,0.0004249004,0.00026951282,0.00014415164,0.00029633488,0.0005281229,0.00035098876,0.00018945729,0.0009566497],"category_scores_gemma":[0.00024290376,0.00012076406,0.00012790045,0.00012803638,0.00021676344,0.00029939675,0.00038031556,0.00024595784,0.00013778529],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003883577,0.00016120076,0.0031843155,0.0001031917,0.000050490282,0.0002261825,0.00013029088,0.91348374,0.015799362,0.0016213617,0.0013920708,0.06345943],"study_design_scores_gemma":[0.000017143127,0.000066883105,0.0007705567,0.0000025570716,0.0000078091925,0.0000111555755,0.000023633793,0.9958669,0.0024230299,0.0003531875,0.00045328485,0.0000039846786],"about_ca_topic_score_codex":0.004274223,"about_ca_topic_score_gemma":0.005789159,"teacher_disagreement_score":0.004274223,"about_ca_system_score_codex":0.0003503885,"about_ca_system_score_gemma":0.00037819904,"threshold_uncertainty_score":0.008498669},"labels":[],"label_agreement":null},{"id":"W4413950493","doi":"10.3390/ai6090213","title":"A Survey of Traditional and Emerging Deep Learning Techniques for Non-Intrusive Load Monitoring","year":2025,"lang":"en","type":"article","venue":"AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Deep learning; Computer science; Data science; Environmental science; Artificial intelligence","score_opus":0.013268313564776568,"score_gpt":0.24541749410170113,"score_spread":0.23214918053692457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413950493","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012327629,0.2393216,0.72475415,0.0026815364,0.0005497511,0.0001364956,0.00051138207,0.0014874667,0.018230004],"genre_scores_gemma":[0.23140667,0.4510277,0.29108685,0.0025057653,0.001364883,0.00039234306,0.0022119605,0.00036535188,0.019638514],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940526,0.0001237497,0.00006733496,0.00014412832,0.00021599216,0.000043567394],"domain_scores_gemma":[0.9991696,0.0004847468,0.000049163886,0.000068678455,0.000199038,0.000028735627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011069925,0.0010980516,0.0006927989,0.0016279133,0.00025333988,0.0012481278,0.0014641734,0.0009876173,0.0021107139],"category_scores_gemma":[0.0025046684,0.000444255,0.0008028054,0.002245171,0.00037811827,0.001961427,0.00083601184,0.0015730163,0.0010241102],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006214512,0.000105036794,0.0018335057,0.0016775624,0.00011493987,0.000067955014,0.000119969736,0.02405311,0.0022417821,0.013219295,0.009577674,0.9469271],"study_design_scores_gemma":[0.00003199662,0.00047145894,0.0051714987,0.0023850533,0.00030540882,0.00083112245,0.00030333007,0.66689366,0.013420941,0.04876452,0.2613011,0.00011992664],"about_ca_topic_score_codex":0.0029195286,"about_ca_topic_score_gemma":0.0029388682,"teacher_disagreement_score":0.0029195286,"about_ca_system_score_codex":0.0007396283,"about_ca_system_score_gemma":0.000832403,"threshold_uncertainty_score":0.0070610642},"labels":[],"label_agreement":null},{"id":"W4414008109","doi":"10.1109/tcsi.2025.3600455","title":"Offline Deep Reinforcement Learning-Based Home Energy Management Systems With Heterogeneous EV Charging Load Models","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits and Systems I Regular Papers","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Reinforcement learning; Computer science; Reinforcement; Load management; Energy management; Energy (signal processing); Electrical engineering; Electronic engineering; Engineering; Artificial intelligence; Mathematics","score_opus":0.00749697721389709,"score_gpt":0.1754276229158393,"score_spread":0.16793064570194222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414008109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13891166,0.0005311238,0.8526756,0.00041603902,0.000077647645,0.00008536722,0.00013741635,0.0016237382,0.0055414294],"genre_scores_gemma":[0.9784298,0.00006535859,0.019232985,0.00011439601,0.000017010278,0.000058355094,0.00010584654,0.000027834547,0.0019484682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997303,0.00006269093,0.000013756472,0.000084405656,0.000046888323,0.00006204363],"domain_scores_gemma":[0.9994418,0.00028280012,0.00007483972,0.000043085507,0.00011906823,0.000038462844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007311706,0.0007825057,0.0010458834,0.00020757035,0.00027092773,0.00066687807,0.0011460563,0.0006895606,0.001680193],"category_scores_gemma":[0.0015804975,0.00043713333,0.00039407454,0.0002466746,0.00047171072,0.000726246,0.0009447316,0.0011286626,0.00027357505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008046438,0.0000824472,0.00070908904,0.000022047994,0.000023624558,0.000044883636,0.00002302412,0.9682404,0.00063846534,0.000875512,0.0005304248,0.028729696],"study_design_scores_gemma":[0.0000030676592,0.000009345974,0.00004472692,9.224751e-7,0.0000014875455,0.0000020024866,0.0000015005326,0.9995772,0.000074092226,0.00025169656,0.00003288528,9.919004e-7],"about_ca_topic_score_codex":0.010275316,"about_ca_topic_score_gemma":0.008705996,"teacher_disagreement_score":0.010275316,"about_ca_system_score_codex":0.00085460284,"about_ca_system_score_gemma":0.0007899751,"threshold_uncertainty_score":0.020430982},"labels":[],"label_agreement":null},{"id":"W4414008130","doi":"10.1109/access.2025.3606499","title":"Integrating Device-Level Flexibility in Home Energy Management Systems for Prosumers","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Qassim University","keywords":"Flexibility (engineering); Computer science; Energy management; Risk analysis (engineering); Energy (signal processing); Business","score_opus":0.040625160796627896,"score_gpt":0.2935481744525463,"score_spread":0.2529230136559184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414008130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7522666,0.0003203149,0.232304,0.00040186816,0.000050812087,0.000093338196,0.00015919346,0.00059577456,0.013808076],"genre_scores_gemma":[0.9949397,0.000030371557,0.004676368,0.000009661497,0.000003254751,0.000008683227,0.000016103239,0.000005117123,0.00031074503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997844,0.00008573647,0.000010481741,0.000034907895,0.000055832796,0.000028704759],"domain_scores_gemma":[0.9997167,0.00015129006,0.000027345744,0.0000609815,0.000029759063,0.000013883627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037160164,0.00046759006,0.000300551,0.00022096021,0.00040444004,0.00083691813,0.00052039896,0.00039433647,0.0014755861],"category_scores_gemma":[0.00085429515,0.00020843447,0.00029264903,0.00020059731,0.00035384926,0.0011594401,0.00067652046,0.00044236457,0.00016662657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023243335,0.00012180291,0.0075139813,0.000056080895,0.00005512043,0.00037109284,0.00018605647,0.91880935,0.011413711,0.007097526,0.00042206733,0.0537207],"study_design_scores_gemma":[0.000009314138,0.00011716415,0.0018050263,0.000009604009,0.000018219092,0.000072458,0.00011521366,0.98909235,0.003584329,0.004031955,0.0011250284,0.000019263245],"about_ca_topic_score_codex":0.0023627023,"about_ca_topic_score_gemma":0.003859079,"teacher_disagreement_score":0.0023627023,"about_ca_system_score_codex":0.00035682705,"about_ca_system_score_gemma":0.0002463815,"threshold_uncertainty_score":0.004936278},"labels":[],"label_agreement":null},{"id":"W4414054176","doi":"10.1109/access.2025.3607516","title":"Optimal Photovoltaic Energy Allocation in Residential Renewable Energy Communities","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Framework Programme; Ontario Ministry of Research and Innovation; Ontario Ministry of Research, Innovation and Science; European Commission; Ministerio de Ciencia, Innovación y Universidades","keywords":"Renewable energy; Software deployment; Remuneration; Photovoltaic system; Linear programming; Energy consumption; Production (economics); Electricity","score_opus":0.014146548760323525,"score_gpt":0.24564081915705152,"score_spread":0.23149427039672799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414054176","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16323616,0.0005535349,0.81900734,0.00021395551,0.000046075438,0.00014674533,0.00016320245,0.00027535908,0.016357634],"genre_scores_gemma":[0.9487163,0.00017125426,0.048817467,0.000026763288,0.000013737896,0.00007963371,0.00006354865,0.000040792565,0.0020705094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997181,0.00012575628,0.000008400196,0.00003822942,0.00005388416,0.000055661203],"domain_scores_gemma":[0.9997557,0.00014014999,0.00003018702,0.000013987966,0.00004270992,0.000017360228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005090963,0.0004880818,0.00063220045,0.0004313775,0.00025070013,0.00087669695,0.0006000326,0.000603165,0.001798774],"category_scores_gemma":[0.0011275547,0.00033565448,0.00037479616,0.0006295303,0.00026945758,0.0005480309,0.00064836734,0.000354349,0.000244888],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042954576,0.000026199601,0.00028869917,0.000033719258,0.000011547195,0.00002878023,0.000017438006,0.97690976,0.00092196383,0.0022437891,0.00034029988,0.019134782],"study_design_scores_gemma":[0.0000063236894,0.000012577212,0.00011652967,0.0000032577834,0.0000033816068,0.000006480192,0.000014325707,0.9979887,0.00029013818,0.0012940421,0.00026160007,0.0000026995613],"about_ca_topic_score_codex":0.0037975158,"about_ca_topic_score_gemma":0.0057579665,"teacher_disagreement_score":0.0037975158,"about_ca_system_score_codex":0.0006196757,"about_ca_system_score_gemma":0.00064011407,"threshold_uncertainty_score":0.007550776},"labels":[],"label_agreement":null},{"id":"W4414155903","doi":"10.63095/nbseh.25.546902","title":"Investigating Potential New Load Patterns on Distribution Transformers from Residential Electrification","year":2025,"lang":"en","type":"article","venue":"Natural Built Social Environment Health","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"","keywords":"Electrification; Transformer; Electricity; Grid; Distribution transformer; Electricity demand; Water heating; Electric vehicle; Electrocution","score_opus":0.007974585205198463,"score_gpt":0.2346235890809817,"score_spread":0.2266490038757832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414155903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99762136,0.000006959727,0.0001317434,0.000021237096,8.12504e-7,0.000007709014,0.0003390356,0.000004418934,0.0018666763],"genre_scores_gemma":[0.99878865,0.000019263529,0.00008310673,0.0000053512836,0.0000010741167,0.0000028357397,0.00036039567,0.0000019872678,0.0007373554],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997756,0.000040045914,0.000008710384,0.00003434677,0.000091017915,0.000050318482],"domain_scores_gemma":[0.9993766,0.00014194984,0.00011927434,0.000039329614,0.0002667432,0.000056161818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020722153,0.00018282118,0.000117695876,0.00059027027,0.0004095667,0.000515939,0.00035802033,0.00029008256,0.0016395804],"category_scores_gemma":[0.0011181021,0.00011054506,0.00020205641,0.0010133577,0.0003088423,0.00040434807,0.00034034968,0.00020768875,0.00029774377],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030993822,0.000097261865,0.96863014,0.000028852784,0.000030273668,0.00079081365,0.0021531156,0.005985159,0.003275727,0.00033918954,0.00073841604,0.01762103],"study_design_scores_gemma":[0.0000027001856,0.000034288078,0.99273795,0.0000041573717,0.0000065845475,0.00011572559,0.0022153223,0.003743653,0.0005186308,0.0000713372,0.0005434556,0.0000062383833],"about_ca_topic_score_codex":0.25714517,"about_ca_topic_score_gemma":0.53230923,"teacher_disagreement_score":0.25714517,"about_ca_system_score_codex":0.0021217836,"about_ca_system_score_gemma":0.00059457315,"threshold_uncertainty_score":0.51129687},"labels":[],"label_agreement":null},{"id":"W4414298134","doi":"10.1016/j.ecmx.2025.101249","title":"Pricing and trading strategies in networked microgrid systems: A comprehensive review","year":2025,"lang":"en","type":"review","venue":"Energy Conversion and Management X","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"EPCOR; Natural Sciences and Engineering Research Council of Canada; AltaLink; Alberta Electric System Operator","keywords":"Microgrid; Key (lock); Scalability; Task (project management); Pricing strategies; Dynamic pricing","score_opus":0.015474317374713166,"score_gpt":0.24080050899445676,"score_spread":0.2253261916197436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414298134","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001135826,0.9904997,0.0039311764,0.0005227561,0.00018880871,0.000019331852,0.000051051156,0.000020814095,0.0036304414],"genre_scores_gemma":[0.012267462,0.9846169,0.0019615418,0.00016903745,0.00027539828,0.000019409286,0.00006834213,0.000007769265,0.0006142559],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948716,0.0001353414,0.000082343766,0.000082226994,0.00017470088,0.0000382051],"domain_scores_gemma":[0.99784625,0.0015826629,0.00021372571,0.000047554135,0.00027160792,0.000038221136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001094703,0.0011389392,0.0012527037,0.0018297883,0.0003617497,0.0018714998,0.0010819429,0.0013274185,0.0028898804],"category_scores_gemma":[0.0028739993,0.00043492747,0.0009888012,0.0031789306,0.0005042141,0.002463321,0.0006844818,0.00081493607,0.00057001977],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087445966,0.00014023756,0.0013752826,0.041754957,0.00034972816,0.00033237354,0.0002917263,0.019833056,0.0008297053,0.052155573,0.01998451,0.86286545],"study_design_scores_gemma":[0.000029147752,0.00037832238,0.0034111175,0.0286487,0.00085704785,0.0014447996,0.00068386237,0.017515354,0.0012893548,0.04121928,0.9043659,0.00015717807],"about_ca_topic_score_codex":0.0032103213,"about_ca_topic_score_gemma":0.002741166,"teacher_disagreement_score":0.0032103213,"about_ca_system_score_codex":0.00083521125,"about_ca_system_score_gemma":0.002085863,"threshold_uncertainty_score":0.009667575},"labels":[],"label_agreement":null},{"id":"W4414301636","doi":"10.1016/j.ifacol.2025.08.125","title":"Operational management of multiple energy communities in the energy market: a bilevel optimization-based approach","year":2025,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Commission for Environmental Cooperation","keywords":"Renewable energy; Bilevel optimization; Distributed generation; Key (lock); Grid; Sustainability; Smart grid; Profitability index; Energy management","score_opus":0.011202731329830896,"score_gpt":0.20101248375003913,"score_spread":0.18980975242020823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414301636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032683797,0.0004408357,0.95718044,0.0007773617,0.000050123082,0.000103234626,0.00007180101,0.000095564974,0.0085969],"genre_scores_gemma":[0.8883797,0.0005142117,0.10479406,0.00019017128,0.00008231406,0.00033670288,0.0001501061,0.00008010241,0.005472691],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984717,0.00076043746,0.000055639488,0.00022793551,0.00020079628,0.00028356],"domain_scores_gemma":[0.9979936,0.0013370091,0.00022511887,0.000057791935,0.00022554243,0.0001609644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002879131,0.0013658045,0.0022594698,0.0010421447,0.00091004214,0.0041127484,0.0017709731,0.0030564799,0.0031772386],"category_scores_gemma":[0.0045640487,0.0010089331,0.0013728294,0.0011899157,0.0017418682,0.002055792,0.003214855,0.002337786,0.00032090317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019210946,0.000028408434,0.00019688939,0.000025004836,0.00002792669,0.00005468057,0.000032110547,0.9875234,0.00016541229,0.009271908,0.00016092924,0.0024941817],"study_design_scores_gemma":[0.0000052729783,0.000010655753,0.000028342238,0.000003483069,0.0000041890444,0.0000040754308,0.000019584522,0.9962807,0.000029972676,0.0034598403,0.00015126682,0.0000025312866],"about_ca_topic_score_codex":0.00858058,"about_ca_topic_score_gemma":0.0061232396,"teacher_disagreement_score":0.00858058,"about_ca_system_score_codex":0.001751592,"about_ca_system_score_gemma":0.0024223744,"threshold_uncertainty_score":0.017061234},"labels":[],"label_agreement":null},{"id":"W4414305174","doi":"10.1016/j.epsr.2026.113109","title":"Chance Constrained Models for the Operation of Electric Storage in Energy and Reserve Markets with Uncertainty in Wind Power","year":2025,"lang":"en","type":"preprint","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wind power; Context (archaeology); Energy storage; Range (aeronautics); Wind speed; Mode (computer interface); Pumped-storage hydroelectricity; Power (physics); Electric power system","score_opus":0.025799515618593876,"score_gpt":0.27644155799108877,"score_spread":0.2506420423724949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414305174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21257862,0.0052155983,0.71783596,0.009751233,0.00053145114,0.00019284476,0.0028420065,0.0005128356,0.050539445],"genre_scores_gemma":[0.9589024,0.0013156399,0.010014887,0.00030494053,0.00020217655,0.00016964228,0.00055179803,0.00016368744,0.02837472],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877185,0.00058193784,0.000060617396,0.00018051817,0.00014298748,0.00026212362],"domain_scores_gemma":[0.99028367,0.007894799,0.00075305364,0.00016421959,0.0004727294,0.00043153396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036384317,0.0016888236,0.0033144525,0.0009798394,0.00084830745,0.00402846,0.0029005252,0.0041180253,0.010569935],"category_scores_gemma":[0.013534034,0.0019815434,0.0017417272,0.001650281,0.002539573,0.00468692,0.0016904974,0.0037264219,0.00076534663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006779494,0.000017889706,0.00021066537,0.000036201876,0.00003010328,0.00006820433,0.000038394293,0.94084847,0.00011872438,0.056657292,0.0010351853,0.0008710038],"study_design_scores_gemma":[0.000013745939,0.00000773055,0.00009008675,0.0000056085887,0.0000070513092,0.0000072805838,0.000012305433,0.97917044,0.000022568925,0.02051294,0.00014024656,0.000010011653],"about_ca_topic_score_codex":0.022437293,"about_ca_topic_score_gemma":0.015914522,"teacher_disagreement_score":0.022437293,"about_ca_system_score_codex":0.0026877823,"about_ca_system_score_gemma":0.0020258625,"threshold_uncertainty_score":0.04461342},"labels":[],"label_agreement":null},{"id":"W4414308733","doi":"10.1115/es2025-156635","title":"The Economic Dispatch of Power-to-Gas Systems With Deep Reinforcement Learning: Tackling the Challenge of Delayed Rewards With Long-Term Energy Storage","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Siemens (Canada); McGill University","funders":"","keywords":"Economic dispatch; Electricity; Energy storage; Renewable energy; Reinforcement learning; Electric power system; Wind power; Energy (signal processing)","score_opus":0.004022554718895172,"score_gpt":0.19010140280716445,"score_spread":0.18607884808826927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414308733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6456324,0.00058756536,0.34237257,0.002096291,0.00015068558,0.00010401514,0.00016921252,0.0003431909,0.008544107],"genre_scores_gemma":[0.9935068,0.00004834328,0.005926584,0.000045423363,0.000010508577,0.00001364632,0.000023274355,0.000009301563,0.00041621333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996669,0.00015621282,0.000014454263,0.000046402536,0.000048451773,0.000067576366],"domain_scores_gemma":[0.9970843,0.0021855219,0.00025319733,0.00008121016,0.00022320561,0.00017253109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014946416,0.0006380834,0.0007015136,0.00027293625,0.0003435169,0.0010244596,0.0007572875,0.00091740396,0.0016368468],"category_scores_gemma":[0.0049779504,0.00034757782,0.00034803496,0.00023117581,0.0007102655,0.0012576741,0.0008224012,0.0017735342,0.00013529224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004392526,0.00002397872,0.00066321023,0.0000133054245,0.00000867293,0.000031423242,0.00000839221,0.9947136,0.00015665553,0.0016479815,0.00015373077,0.00253505],"study_design_scores_gemma":[0.0000031190934,0.0000071481304,0.000068048204,0.0000011927181,9.552871e-7,0.0000012596665,0.0000029243022,0.9992125,0.000047606216,0.00062323123,0.00003077513,0.000001154974],"about_ca_topic_score_codex":0.012464741,"about_ca_topic_score_gemma":0.008594228,"teacher_disagreement_score":0.012464741,"about_ca_system_score_codex":0.0011665907,"about_ca_system_score_gemma":0.0013156835,"threshold_uncertainty_score":0.024784386},"labels":[],"label_agreement":null},{"id":"W4414387560","doi":"10.3390/ai6090238","title":"GRU-BERT for NILM: A Hybrid Deep Learning Architecture for Load Disaggregation","year":2025,"lang":"en","type":"article","venue":"AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Deep learning; Energy consumption; Software deployment; Transformer; Key (lock); Cloud computing; Encoder; Autoencoder; Architecture","score_opus":0.003842496880986651,"score_gpt":0.21336823480811856,"score_spread":0.20952573792713192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414387560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05158002,0.0014255885,0.9325597,0.0006468593,0.00018047424,0.00005980728,0.00070291455,0.007679978,0.005164689],"genre_scores_gemma":[0.8320425,0.00060286804,0.1510891,0.0005721486,0.000069037174,0.00016484717,0.0018447303,0.000335088,0.0132796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998079,0.000036026835,0.000008834196,0.000065353546,0.000040807987,0.00004116564],"domain_scores_gemma":[0.9998447,0.000050097817,0.000016176346,0.00002570084,0.00004531493,0.000018015342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047839462,0.0010885767,0.00064587547,0.00045735628,0.0002752387,0.00059731316,0.0019134261,0.00094284496,0.00293828],"category_scores_gemma":[0.00097496115,0.0004687506,0.0006695495,0.00050538837,0.0004325195,0.0013256157,0.0010437901,0.0017248155,0.0010783108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023515175,0.00020315936,0.0019999756,0.000120861754,0.00014822265,0.00015344695,0.000091545255,0.70281965,0.008913525,0.009613309,0.010435493,0.26526564],"study_design_scores_gemma":[0.0000028048833,0.00001868932,0.00007587712,0.0000044365374,0.000005475457,0.000009195674,0.0000035178166,0.9969488,0.00073525385,0.0016944732,0.00049682654,0.0000047012663],"about_ca_topic_score_codex":0.01051333,"about_ca_topic_score_gemma":0.021610806,"teacher_disagreement_score":0.01051333,"about_ca_system_score_codex":0.0009117085,"about_ca_system_score_gemma":0.00093668833,"threshold_uncertainty_score":0.020904303},"labels":[],"label_agreement":null},{"id":"W4414415798","doi":"10.1016/j.segan.2025.101983","title":"A market-clearing mechanism based on hierarchical-spectral clustering with multiple similarity measures for flexibility spot markets","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Flexibility (engineering); Cluster analysis; Scalability; Market clearing; Electricity; Clearing; Electric power system; Electricity market; Demand response","score_opus":0.005821031936481497,"score_gpt":0.19665212321673048,"score_spread":0.19083109128024897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414415798","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035533626,0.00012393483,0.9617775,0.00013363274,0.000054922217,0.00013135096,0.000048714573,0.00042408257,0.0017722239],"genre_scores_gemma":[0.82323426,0.00010166845,0.17343685,0.00009181248,0.000088050496,0.00016136859,0.00016422161,0.00008800383,0.0026337474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835795,0.0005846482,0.00011805539,0.00033798686,0.00040511283,0.00019615541],"domain_scores_gemma":[0.9971762,0.0010174605,0.00026392753,0.0005457905,0.00078307354,0.0002136044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023517702,0.0005117428,0.0017180698,0.0012432152,0.0013047167,0.0016356948,0.00309738,0.0015222136,0.0036046167],"category_scores_gemma":[0.0062157824,0.00044263687,0.0008962657,0.001694725,0.0009972963,0.0034112595,0.0018279804,0.000965084,0.00059693865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00081554276,0.00071310386,0.0011326784,0.00018025946,0.00020041964,0.00020511445,0.00024054358,0.5878313,0.013405442,0.18733111,0.008367788,0.19957669],"study_design_scores_gemma":[0.000020302248,0.000041236275,0.000121868456,0.0000022169302,0.000008912478,0.000024441542,0.000012110927,0.9849258,0.0006371101,0.013859971,0.00033203093,0.000013989266],"about_ca_topic_score_codex":0.0024639585,"about_ca_topic_score_gemma":0.00273556,"teacher_disagreement_score":0.0036046167,"about_ca_system_score_codex":0.0010948004,"about_ca_system_score_gemma":0.0016756329,"threshold_uncertainty_score":0.012437522},"labels":[],"label_agreement":null},{"id":"W4414450065","doi":"","title":"BuGUI: A Widget System for Button Grid Controllers","year":2025,"lang":"en","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Society for Arts and Technology","funders":"Irish Research Council","keywords":"","score_opus":0.005471558811649681,"score_gpt":0.18708115849475054,"score_spread":0.18160959968310086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414450065","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010512796,0.00093883835,0.36053303,0.00035826262,0.00066682644,0.00046394585,0.0057416866,0.6050566,0.015728103],"genre_scores_gemma":[0.3630095,0.0020417452,0.29910627,0.0034715012,0.0006716213,0.002764898,0.028911145,0.14629349,0.15372977],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993038,0.00010691047,0.00006524719,0.00013381754,0.00026184364,0.00012834519],"domain_scores_gemma":[0.99810445,0.0007649378,0.000094216775,0.00046655253,0.0003088975,0.00026094218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013545331,0.0025770417,0.0015082483,0.0016018341,0.00066068984,0.0024372055,0.0028946083,0.0015635883,0.09131935],"category_scores_gemma":[0.0054840026,0.0011351234,0.00082885515,0.0008099021,0.000426163,0.0030985933,0.00301776,0.0018429636,0.025264444],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006464269,0.00039974158,0.004571176,0.0018012637,0.00034611646,0.0011724143,0.0015391957,0.0031939016,0.050330568,0.009414466,0.44936404,0.47140285],"study_design_scores_gemma":[0.0014936408,0.0009655403,0.007777941,0.00060306955,0.0005529793,0.0016422155,0.00044939664,0.08736703,0.10948719,0.014539375,0.77440804,0.0007135387],"about_ca_topic_score_codex":0.002664277,"about_ca_topic_score_gemma":0.0017654358,"teacher_disagreement_score":0.09131935,"about_ca_system_score_codex":0.00048374324,"about_ca_system_score_gemma":0.0005882745,"threshold_uncertainty_score":0.30549365},"labels":[],"label_agreement":null},{"id":"W4414463054","doi":"10.1109/icscds65426.2025.11167018","title":"AI-Enhanced IoT Energy Management: Integrating Monte Carlo Simulation, Game-Theoretic Approaches, and Agent-based Modeling for Sustainable Solutions","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CGI (Canada)","funders":"","keywords":"Monte Carlo method; Benchmark (surveying); Energy (signal processing); Supply chain; Resource (disambiguation); Process (computing); Resource allocation; Energy supply","score_opus":0.01561385701068039,"score_gpt":0.21831319517467604,"score_spread":0.20269933816399566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414463054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014994283,0.0006299189,0.97217745,0.0006968512,0.000113966205,0.00007274337,0.0000988363,0.00094565994,0.010270266],"genre_scores_gemma":[0.7394748,0.0012235993,0.25444773,0.00028157493,0.0001283823,0.00020677737,0.0002907506,0.00020808578,0.003738369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956185,0.00017262626,0.00002130204,0.000048950762,0.00017186588,0.000023414417],"domain_scores_gemma":[0.99896693,0.0006022139,0.00010281905,0.000112323054,0.00016585745,0.0000498909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010757333,0.00062019116,0.0006468641,0.0008494711,0.0003587674,0.0015128569,0.0009524095,0.0007406683,0.0017006448],"category_scores_gemma":[0.0024308665,0.00028769547,0.0005601296,0.0008464189,0.00058728206,0.001914326,0.00083704805,0.0010098788,0.00039941465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003358004,0.000061927756,0.000826347,0.000055967397,0.000051657917,0.000033292003,0.000038356848,0.9422653,0.001047041,0.020612992,0.0009063641,0.034067262],"study_design_scores_gemma":[0.0000024268877,0.0000047170124,0.000055146644,0.000004973973,0.0000027709054,0.0000056683066,0.000004941793,0.9920162,0.00019993384,0.0069980137,0.00070160895,0.000003572499],"about_ca_topic_score_codex":0.007880837,"about_ca_topic_score_gemma":0.0063983137,"teacher_disagreement_score":0.007880837,"about_ca_system_score_codex":0.0010702586,"about_ca_system_score_gemma":0.0011136624,"threshold_uncertainty_score":0.015669942},"labels":[],"label_agreement":null},{"id":"W4414539915","doi":"10.1109/icc52391.2025.11161003","title":"Advanced Home Energy Management Using Proximal Policy Optimization with a Comprehensive Appliance Set","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec","funders":"","keywords":"Energy management; Energy consumption; Baseline (sea); Relevance (law); Smart grid; Energy management system; Consumption (sociology); Set (abstract data type)","score_opus":0.0074314083392303075,"score_gpt":0.22088179161577015,"score_spread":0.21345038327653984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414539915","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024274375,0.00013738967,0.97170377,0.00015003579,0.000031559233,0.000037872236,0.000031142812,0.0003253516,0.0033084236],"genre_scores_gemma":[0.9327804,0.00012603086,0.063727625,0.0001124667,0.000030785184,0.00008649485,0.00006585675,0.000044686614,0.0030255865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996706,0.000121854544,0.0000113017395,0.00007384095,0.00007540613,0.0000469483],"domain_scores_gemma":[0.9996662,0.00017551446,0.00003970125,0.0000292581,0.00005527397,0.000034055152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000671045,0.0006828256,0.00086197763,0.00026192624,0.0002926683,0.00077730307,0.00076014164,0.0006430899,0.0017860723],"category_scores_gemma":[0.0010651362,0.00030971985,0.0004152287,0.00028361904,0.0005350531,0.00075929234,0.0011343072,0.0008938327,0.000271603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033981996,0.000032709228,0.00023370357,0.00002204622,0.000018809606,0.00003744217,0.000021028387,0.9824076,0.00080972834,0.0032060395,0.0004252585,0.012751607],"study_design_scores_gemma":[0.0000037109469,0.000013277783,0.000034410106,0.0000015749234,0.0000027003714,0.000004826192,0.0000042401693,0.9982425,0.00014300455,0.0013684394,0.00017924803,0.0000020002342],"about_ca_topic_score_codex":0.0029398536,"about_ca_topic_score_gemma":0.0032337753,"teacher_disagreement_score":0.0029398536,"about_ca_system_score_codex":0.0004744993,"about_ca_system_score_gemma":0.0008647619,"threshold_uncertainty_score":0.0059750676},"labels":[],"label_agreement":null},{"id":"W4414543884","doi":"10.1257/app.20230468","title":"Down to the Wire: Leveraging Technology to Improve Electric Utility Cost Recovery","year":2025,"lang":"en","type":"article","venue":"American Economic Journal Applied Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Electric utility; Consumption (sociology); Revenue; Grid; Cost–benefit analysis; Expected utility hypothesis; Cost benefit","score_opus":0.0038960213491739492,"score_gpt":0.19583358307699208,"score_spread":0.19193756172781815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414543884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9617948,0.000555278,0.003223511,0.0018612089,0.00006053018,0.00013943778,0.00014053167,0.00005889821,0.032165695],"genre_scores_gemma":[0.9973123,0.00048871344,0.0006025645,0.000092579634,0.0000126546365,0.000018507877,0.000024830624,0.0000031630948,0.0014447294],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99962187,0.00013315158,0.000008937444,0.00003965121,0.000059678754,0.00013667066],"domain_scores_gemma":[0.9990964,0.00038197575,0.00032484336,0.000033611956,0.00008466048,0.000078515666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004348174,0.0003323507,0.00016612906,0.00044391552,0.00046944924,0.0014321213,0.00054821424,0.0006882154,0.004619893],"category_scores_gemma":[0.0016847133,0.00008783355,0.00018692331,0.0009928169,0.00091035693,0.0011680273,0.00081813586,0.00054397935,0.00033829777],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031456805,0.008611996,0.07528944,0.0016344824,0.00029541945,0.004537855,0.003176034,0.18860573,0.024350055,0.108201556,0.025343925,0.5568079],"study_design_scores_gemma":[0.0020979212,0.018649176,0.34595445,0.00086893624,0.0013791438,0.0010941507,0.040662557,0.32049516,0.03864443,0.118411,0.11140878,0.0003342717],"about_ca_topic_score_codex":0.013676235,"about_ca_topic_score_gemma":0.015434006,"teacher_disagreement_score":0.013676235,"about_ca_system_score_codex":0.0019859634,"about_ca_system_score_gemma":0.0014102485,"threshold_uncertainty_score":0.027193248},"labels":[],"label_agreement":null},{"id":"W4414583580","doi":"10.1016/j.suscom.2025.101214","title":"A two-stage spatio-temporal flexibility-based energy optimization of internet data centers in active distribution networks based on robust control and transformer machine learning strategy","year":2025,"lang":"en","type":"article","venue":"Sustainable Computing Informatics and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Mean squared error; Robustness (evolution); Mean absolute percentage error; Approximation error; Feature selection; Efficient energy use; Extreme learning machine; Renewable energy; Gradient boosting","score_opus":0.010361380630286141,"score_gpt":0.2174166966273537,"score_spread":0.20705531599706756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414583580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03949167,0.0003314954,0.95364225,0.00022514282,0.00005377169,0.000066601744,0.00003892351,0.0001675123,0.0059827096],"genre_scores_gemma":[0.9772117,0.00013310395,0.019943558,0.000043033342,0.000017820154,0.00007362379,0.000037764934,0.000028915643,0.0025105008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996574,0.000087723114,0.000019553447,0.00008609509,0.00008129667,0.00006798618],"domain_scores_gemma":[0.99971837,0.00013090251,0.000037664056,0.000016957283,0.00007518605,0.000020869014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087320583,0.00081818964,0.0013253246,0.000415036,0.0005990954,0.0013555824,0.0013349799,0.0011399155,0.0023165883],"category_scores_gemma":[0.0009407673,0.0005416173,0.0008336723,0.000487334,0.00078920013,0.0011807588,0.001241111,0.00064613373,0.00016677359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007633131,0.000026556694,0.0002974956,0.000052654865,0.000029933934,0.00005915704,0.00003869397,0.9837151,0.0016265915,0.0046147583,0.00031409485,0.009148674],"study_design_scores_gemma":[0.000003550398,0.000015652817,0.00004599899,0.000001780848,0.0000048878865,0.000005565355,0.0000048046504,0.9992009,0.00018252632,0.0004679773,0.00006366825,0.0000027420074],"about_ca_topic_score_codex":0.007335316,"about_ca_topic_score_gemma":0.0052456274,"teacher_disagreement_score":0.007335316,"about_ca_system_score_codex":0.00067915325,"about_ca_system_score_gemma":0.000934297,"threshold_uncertainty_score":0.014585197},"labels":[],"label_agreement":null},{"id":"W4414592678","doi":"10.3390/electronics14193846","title":"Climate-Adaptive Residential Demand Response Integration with Power Quality-Aware Distributed Generation Systems: A Comprehensive Multi-Objective Optimization Framework for Smart Home Energy Management","year":2025,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Demand response; Flexibility (engineering); Renewable energy; Adaptability; Distributed generation; Home automation; Artificial neural network; Electric power system; Sensitivity (control systems)","score_opus":0.012628254243127624,"score_gpt":0.2512719327620055,"score_spread":0.23864367851887786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414592678","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0818277,0.00040613598,0.9122541,0.00024182987,0.000030767333,0.000048801172,0.000046779525,0.00020747333,0.00493644],"genre_scores_gemma":[0.9392881,0.00017873645,0.058475792,0.00005078195,0.0000241706,0.00008117193,0.00005409723,0.000028770686,0.0018182725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99988973,0.0000393978,0.0000043126547,0.000021881027,0.00002623856,0.000018492497],"domain_scores_gemma":[0.9999211,0.00003123251,0.000012166819,0.0000051785914,0.000022191165,0.000008192686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052361947,0.0007562487,0.0004752342,0.0002500966,0.00020970966,0.0005813005,0.00052266975,0.0005610516,0.0007085213],"category_scores_gemma":[0.0003948168,0.00025345368,0.00059672195,0.00025880564,0.00024609343,0.00052367186,0.00052115816,0.00053920696,0.00006425125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008572336,0.000017842376,0.0002150364,0.000012261422,0.000019690111,0.000014126317,0.000009988936,0.99114543,0.0007942425,0.0010799451,0.000088046145,0.006594733],"study_design_scores_gemma":[0.0000014490954,0.000008697856,0.000055460234,0.0000010645343,0.00000313479,0.0000014184271,0.000002568075,0.999419,0.000095174764,0.00033698315,0.00007419227,9.716758e-7],"about_ca_topic_score_codex":0.006447583,"about_ca_topic_score_gemma":0.0071068043,"teacher_disagreement_score":0.006447583,"about_ca_system_score_codex":0.00048308176,"about_ca_system_score_gemma":0.0007958156,"threshold_uncertainty_score":0.012820125},"labels":[],"label_agreement":null},{"id":"W4414749338","doi":"10.3390/s25196082","title":"Personalized Smart Home Automation Using Machine Learning: Predicting User Activities","year":2025,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Home automation; Adaptability; Software deployment; Activity recognition; Automation; Boosting (machine learning); Enhanced Data Rates for GSM Evolution; Software; Field (mathematics)","score_opus":0.009135004001628253,"score_gpt":0.215718626525094,"score_spread":0.20658362252346574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414749338","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044831675,0.0004494936,0.9441778,0.0002678234,0.00006604007,0.00011198527,0.0004143453,0.007127836,0.0025530339],"genre_scores_gemma":[0.75992733,0.00042389272,0.23498377,0.00014278752,0.00006946674,0.00017058199,0.0008772626,0.00015537295,0.0032495654],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997414,0.000058232246,0.000010311375,0.000075199896,0.00007390959,0.00004092109],"domain_scores_gemma":[0.9997955,0.0000796914,0.000022155984,0.00004390568,0.000037727397,0.000021017373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039330762,0.0006446,0.000665643,0.00042650822,0.0002678544,0.00062726845,0.000602198,0.0005287638,0.0009776494],"category_scores_gemma":[0.00094163127,0.0002058307,0.0004011178,0.0005043799,0.00020497563,0.00068087707,0.00051726925,0.00083524385,0.00054091925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025946627,0.0005156669,0.010749385,0.000120259436,0.00011130053,0.00017781976,0.00015656541,0.34039944,0.010777901,0.005931128,0.010254083,0.620547],"study_design_scores_gemma":[0.0000046724417,0.000038618404,0.0013833881,0.000007431065,0.000008410837,0.000036968457,0.000012664075,0.99191695,0.002569097,0.0023368162,0.0016757842,0.0000091206875],"about_ca_topic_score_codex":0.005923705,"about_ca_topic_score_gemma":0.00816672,"teacher_disagreement_score":0.005923705,"about_ca_system_score_codex":0.00041693263,"about_ca_system_score_gemma":0.00055221224,"threshold_uncertainty_score":0.011778474},"labels":[],"label_agreement":null},{"id":"W4414771054","doi":"10.1016/j.ijepes.2025.111142","title":"Distributed coordination of electric vehicles charging station and home energy management systems in residential neighborhood","year":2025,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Hydro-Québec; Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Fondation de l’UQTR","keywords":"Flexibility (engineering); Incentive; Energy management; Energy consumption; Electric vehicle; Baseline (sea); Demand response; Management system; Energy (signal processing)","score_opus":0.0034689424716547366,"score_gpt":0.2059865940925808,"score_spread":0.20251765162092605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414771054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38634336,0.0002001984,0.5995235,0.00017259235,0.00004317546,0.00014691036,0.00005598809,0.0005785016,0.012935912],"genre_scores_gemma":[0.98865473,0.000028290682,0.010105769,0.000008129484,0.000004207016,0.000022509465,0.0000152099365,0.000008224606,0.0011528648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995586,0.00015758935,0.00001527782,0.000112885224,0.00008754321,0.000068034075],"domain_scores_gemma":[0.99975616,0.000062011764,0.00004570826,0.00004418875,0.000052038875,0.0000398492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005583679,0.0003443338,0.00038558966,0.00017049782,0.00039852448,0.0006881882,0.00077272893,0.00032320377,0.0013770479],"category_scores_gemma":[0.0006709682,0.00016182114,0.00022940738,0.00024760133,0.0003141629,0.00055526925,0.0008790671,0.0002604736,0.00016922978],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015855512,0.00009464553,0.002084414,0.000034325316,0.000037288606,0.00025295484,0.00009622835,0.94097185,0.0050726817,0.0073095364,0.0006762483,0.04321125],"study_design_scores_gemma":[0.000021486845,0.000097448654,0.0007889529,0.0000026016137,0.00001329368,0.000059317183,0.00007862785,0.9935267,0.0016086766,0.0025367478,0.0012592393,0.000007037418],"about_ca_topic_score_codex":0.0039997194,"about_ca_topic_score_gemma":0.0038490964,"teacher_disagreement_score":0.0039997194,"about_ca_system_score_codex":0.00063748617,"about_ca_system_score_gemma":0.00066165585,"threshold_uncertainty_score":0.007952869},"labels":[],"label_agreement":null},{"id":"W4414904970","doi":"10.1016/j.jclepro.2025.146538","title":"Optimal dispatch of clean resources in networked microgrids: A rank transactive energy framework","year":2025,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Probabilistic logic; Transactive memory; Quantile; Stochastic process; Quantization (signal processing); Distributed generation; Ranking (information retrieval); Process (computing); Convergence (economics)","score_opus":0.0037996107273807426,"score_gpt":0.20277993292044,"score_spread":0.19898032219305925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414904970","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00693749,0.00014510618,0.9898197,0.00020032657,0.00003100782,0.000027630897,0.000039835493,0.000102004546,0.0026968457],"genre_scores_gemma":[0.88670933,0.00036707293,0.10659753,0.00015719507,0.0001018829,0.00013877219,0.00013367807,0.000115983996,0.005678484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990421,0.00037667115,0.000044326254,0.00014715554,0.00029047905,0.000099250174],"domain_scores_gemma":[0.9990613,0.00046906216,0.00013756337,0.0000684553,0.00020105092,0.000062584135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020486983,0.001048249,0.0011846742,0.00052517344,0.00039498828,0.0015689408,0.0015914245,0.0009611437,0.002565097],"category_scores_gemma":[0.002868076,0.0004807798,0.0006017823,0.000678971,0.000981913,0.0017011743,0.0013811765,0.0012474498,0.00030443445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024489129,0.000019079738,0.00012464199,0.000024915398,0.000015818565,0.000029382974,0.000020090833,0.97826767,0.0002686978,0.01384816,0.00029346778,0.00706368],"study_design_scores_gemma":[0.0000026747396,0.0000156517,0.000026997843,0.0000017934625,0.0000025937895,0.000004583713,0.0000052888126,0.9961669,0.00008810217,0.0035209847,0.00016211781,0.0000024059218],"about_ca_topic_score_codex":0.0032932316,"about_ca_topic_score_gemma":0.0031003703,"teacher_disagreement_score":0.0032932316,"about_ca_system_score_codex":0.0008198938,"about_ca_system_score_gemma":0.0013785536,"threshold_uncertainty_score":0.010834694},"labels":[],"label_agreement":null},{"id":"W4415137043","doi":"10.5539/mas.v19n2p48","title":"Adaptive Load Sharing Strategy for Multi-Source Renewable Energy Systems","year":2025,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Battery (electricity); Renewable energy; Photovoltaic system; Energy storage; Power (physics); MATLAB; Electric power system; State of charge; Load following power plant; Electricity generation","score_opus":0.03489984406199082,"score_gpt":0.24324621613375577,"score_spread":0.20834637207176496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415137043","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1733061,0.0007404924,0.78187853,0.00054394547,0.00022557614,0.00024308577,0.00018159047,0.001794801,0.041085865],"genre_scores_gemma":[0.98819786,0.00006126077,0.00902007,0.000034978748,0.00002219156,0.00004068998,0.000037394635,0.000026680027,0.00255889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997106,0.00005729368,0.000020831412,0.00006819266,0.00009912582,0.000043841494],"domain_scores_gemma":[0.99975413,0.00006459078,0.00004727045,0.000035888006,0.00007638051,0.000021723255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042007718,0.00060253416,0.0006240719,0.00049715687,0.00055854645,0.0008348078,0.0010306402,0.00037657414,0.004199473],"category_scores_gemma":[0.00071187655,0.00021997519,0.0003210782,0.00035988033,0.0002144434,0.00086830196,0.0007431237,0.00035817944,0.00059374294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002396745,0.00014761607,0.0008841361,0.00012259858,0.0000627266,0.00019071595,0.00010472201,0.8525573,0.010575121,0.005963783,0.0020673492,0.12708418],"study_design_scores_gemma":[0.000011537167,0.000053662658,0.00026962612,0.0000050545877,0.000006934348,0.00002709827,0.000016891388,0.9963096,0.0010199922,0.0013561979,0.0009164997,0.000006767102],"about_ca_topic_score_codex":0.002835071,"about_ca_topic_score_gemma":0.003630751,"teacher_disagreement_score":0.004199473,"about_ca_system_score_codex":0.00065344526,"about_ca_system_score_gemma":0.0002970205,"threshold_uncertainty_score":0.014048636},"labels":[],"label_agreement":null},{"id":"W4415166551","doi":"10.54254/2755-2721/2026.ka27660","title":"Research on Intelligent Control and Optimization Strategies for Household Electricity Usage","year":2025,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Earl Haig Secondary School","funders":"","keywords":"Electricity; Consumption (sociology); Energy consumption; Energy conservation; Electricity generation; Control (management); Mains electricity; Power consumption","score_opus":0.018318544722487253,"score_gpt":0.24571420295108534,"score_spread":0.22739565822859809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415166551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02973402,0.0032937191,0.9405197,0.0009771265,0.000118327,0.00009953097,0.00004287233,0.00021388565,0.025000831],"genre_scores_gemma":[0.9192209,0.0036344326,0.06951291,0.0002553235,0.00014785746,0.00017232627,0.00008212838,0.000050403258,0.0069236476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995154,0.00015079958,0.00003242847,0.000134089,0.00011295971,0.00005431985],"domain_scores_gemma":[0.9988681,0.00076780573,0.0001349526,0.000047926573,0.00015310154,0.000028100516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000937575,0.0010920719,0.0007920042,0.000561665,0.00036830988,0.0015915859,0.0008805295,0.0008245238,0.0032565116],"category_scores_gemma":[0.0031369806,0.0003791853,0.00053839985,0.0007632574,0.00079499546,0.0012470257,0.00055593596,0.00091855414,0.0003385304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007343381,0.00016962376,0.0011729684,0.0002720953,0.00012867943,0.000098236625,0.00015329229,0.84050626,0.0030100383,0.05180605,0.0015199061,0.10108934],"study_design_scores_gemma":[0.000011084585,0.000073813666,0.00034688076,0.000026115526,0.000018087265,0.00002421881,0.00004350038,0.98308253,0.0006293584,0.0139575945,0.001777702,0.000009181228],"about_ca_topic_score_codex":0.004414401,"about_ca_topic_score_gemma":0.0027194007,"teacher_disagreement_score":0.004414401,"about_ca_system_score_codex":0.00075301586,"about_ca_system_score_gemma":0.0007951068,"threshold_uncertainty_score":0.01089406},"labels":[],"label_agreement":null},{"id":"W4415179402","doi":"10.1007/978-981-96-7477-0_47","title":"A Novel Approach for Monitoring and Controlling Energy in Smart Homes","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Energy (signal processing); Smart grid; Energy consumption; Home automation; Control (management); The Internet; Sustainability; Electric energy; Electricity; Power (physics)","score_opus":0.011289055770494391,"score_gpt":0.19399139367428095,"score_spread":0.18270233790378657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415179402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009747504,0.0008784114,0.96910113,0.0002705255,0.00029490405,0.00006099896,0.00005092563,0.00087016117,0.018725513],"genre_scores_gemma":[0.30857888,0.002425754,0.610218,0.0004995435,0.00034404246,0.00017410083,0.00011907957,0.0001264976,0.07751409],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99973935,0.000029280005,0.0000072252055,0.000080975624,0.00012467064,0.000018420567],"domain_scores_gemma":[0.9999387,0.000017711845,0.0000066378266,0.000013980098,0.000017879727,0.0000050277167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012863922,0.00048683165,0.00044638367,0.00032783923,0.00038448902,0.00081236,0.0008826871,0.0008657038,0.0028725825],"category_scores_gemma":[0.00018172922,0.0002206981,0.00040418355,0.00035007947,0.0004184914,0.0012076336,0.0008304857,0.00062502763,0.00086095394],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019771903,0.0002678204,0.00079208496,0.0003073028,0.00007886501,0.00070365955,0.00041366156,0.01991648,0.2958934,0.11044556,0.012982619,0.5580008],"study_design_scores_gemma":[0.000049513084,0.00048294262,0.0018439562,0.00007614263,0.00011943646,0.0026192185,0.0003467005,0.6346183,0.14368492,0.06158467,0.15448381,0.00009047483],"about_ca_topic_score_codex":0.0007034768,"about_ca_topic_score_gemma":0.0016901426,"teacher_disagreement_score":0.0028725825,"about_ca_system_score_codex":0.00027838533,"about_ca_system_score_gemma":0.0002273629,"threshold_uncertainty_score":0.009609759},"labels":[],"label_agreement":null},{"id":"W4415221198","doi":"10.1016/j.segan.2025.101999","title":"NeuraFlux: A scalable and adaptive framework for autonomous data-driven multi-agent power optimization","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scalability; Reinforcement learning; Modular design; Robustness (evolution); Software deployment; Modularity (biology); Electric power system; Smart grid; Key (lock)","score_opus":0.010273663390656445,"score_gpt":0.22644476057411417,"score_spread":0.21617109718345773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415221198","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038513222,0.00016003146,0.9866996,0.00016954547,0.00006457912,0.0000735254,0.00018496274,0.004756497,0.004040087],"genre_scores_gemma":[0.39739475,0.0003783226,0.5927751,0.00036007547,0.000073682604,0.00073670415,0.000908776,0.0012576422,0.006115054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997645,0.00006372081,0.000013036891,0.00004214762,0.00008223139,0.00003436375],"domain_scores_gemma":[0.9997036,0.00013610572,0.000030852658,0.000036592868,0.000055824126,0.000037107002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008984014,0.0009133422,0.0006306827,0.00031259167,0.00037814802,0.0008967411,0.0018004564,0.000949128,0.00483325],"category_scores_gemma":[0.0017830778,0.00044913683,0.0006632215,0.00025236182,0.00070572604,0.00087718986,0.0015481389,0.001681446,0.0011398813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042728218,0.000029747489,0.00033100872,0.00006500411,0.000031786425,0.00005006505,0.000030894695,0.9526572,0.0011889547,0.013407509,0.004233397,0.027931713],"study_design_scores_gemma":[0.000011977494,0.0000075417943,0.000020790842,0.0000034304906,0.000001676377,0.000005339433,0.0000020189443,0.99570847,0.00016727344,0.0026197569,0.0014489674,0.000002698381],"about_ca_topic_score_codex":0.0066237617,"about_ca_topic_score_gemma":0.010190583,"teacher_disagreement_score":0.0066237617,"about_ca_system_score_codex":0.0007847258,"about_ca_system_score_gemma":0.0016660247,"threshold_uncertainty_score":0.016168833},"labels":[],"label_agreement":null},{"id":"W4415256576","doi":"10.2196/71265","title":"Daily Household Electricity Consumption in Community-Dwelling Older Individuals With Cognitive Impairment: Prospective Cohort Study","year":2025,"lang":"en","type":"article","venue":"JMIR Formative Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Consumption (sociology); Cognition; Prospective cohort study; Cognitive impairment; Cohort study; Cohort; Electricity","score_opus":0.032077647292091026,"score_gpt":0.33270228328302587,"score_spread":0.30062463599093486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415256576","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99840456,0.0002937545,0.0001025453,0.000024564304,0.000009601006,0.000037135553,0.00079161004,0.0000035101527,0.00033266752],"genre_scores_gemma":[0.99842656,0.0001960722,0.00014158571,0.000055009918,0.000014888835,0.000049792725,0.00081046374,0.0000026544,0.00030298135],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99960274,0.00005283882,0.000052340696,0.00013685298,0.00008435352,0.00007089474],"domain_scores_gemma":[0.9993298,0.000050800285,0.00024681713,0.00010125027,0.00013398523,0.00013726678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006885116,0.00048143286,0.0005462018,0.0008373612,0.0007659949,0.00081636966,0.00046329133,0.000668386,0.001111664],"category_scores_gemma":[0.0012009798,0.00057759054,0.0008436048,0.0016507682,0.00025120165,0.00068475155,0.0005404034,0.0010333094,0.00032988406],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014515185,0.00008333796,0.99867946,0.000020522768,0.00012765972,0.00006608595,0.000091187394,0.000020073532,0.00013042089,0.000010465164,0.00009965633,0.000525973],"study_design_scores_gemma":[0.000010873116,0.00010999328,0.99929273,0.000008395388,0.000071304195,0.000096337586,0.00015310953,0.00008939175,0.000015642794,0.000013219847,0.00013472982,0.0000042913484],"about_ca_topic_score_codex":0.014300124,"about_ca_topic_score_gemma":0.019692272,"teacher_disagreement_score":0.014300124,"about_ca_system_score_codex":0.0003010839,"about_ca_system_score_gemma":0.00036596853,"threshold_uncertainty_score":0.0284338},"labels":[],"label_agreement":null},{"id":"W4415535235","doi":"10.1016/j.segan.2025.102028","title":"Predictive risk-aware control for microgrids: Operation of a revenue-generating energy management system","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Vedecká Grantová Agentúra MŠVVaŠ SR a SAV; Agentúra na Podporu Výskumu a Vývoja; European Commission; St. Thomas University","keywords":"Microgrid; Model predictive control; Modular design; Energy management; Renewable energy; Software deployment; Software; Energy management system; Software architecture","score_opus":0.0015207874289688249,"score_gpt":0.167958716183471,"score_spread":0.16643792875450217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415535235","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5537837,0.00041801765,0.42431134,0.0009116666,0.00014357426,0.00015115747,0.00017225787,0.0018359557,0.018272264],"genre_scores_gemma":[0.996292,0.000020573214,0.0030029968,0.000013572115,0.000005986976,0.0000063834796,0.000012046276,0.000007822993,0.0006387064],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975795,0.00007312285,0.000010664895,0.00004776676,0.00006732282,0.00004319073],"domain_scores_gemma":[0.9996834,0.00011243353,0.000053240423,0.0000313668,0.00009268238,0.000026868054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005320439,0.0005447598,0.00058479677,0.00021117885,0.0004933717,0.0010426616,0.00074423745,0.0003818989,0.0017965954],"category_scores_gemma":[0.0009072804,0.00019986495,0.000241817,0.00025357574,0.0003192535,0.00060360064,0.0006615562,0.00070277526,0.00022390512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046672544,0.00020140705,0.0015843116,0.000069799185,0.000054188127,0.00020293039,0.00012991075,0.9301125,0.007688576,0.004309395,0.0017615117,0.05341881],"study_design_scores_gemma":[0.000012574835,0.000055613673,0.00027151377,0.0000025463776,0.000009294217,0.000016869584,0.000011831172,0.9976259,0.0010681523,0.0007451612,0.0001754729,0.0000050865683],"about_ca_topic_score_codex":0.0062004076,"about_ca_topic_score_gemma":0.0060065696,"teacher_disagreement_score":0.0062004076,"about_ca_system_score_codex":0.00047657223,"about_ca_system_score_gemma":0.0008435803,"threshold_uncertainty_score":0.012328625},"labels":[],"label_agreement":null},{"id":"W4415819116","doi":"10.3390/en18215756","title":"Techno-Economic Assessment of Net Metering and Energy Sharing in a Mixed-Use Renewable Energy Community in Montreal: A Simulation-Based Approach Using Tool4Cities","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Net metering; Renewable energy; Tariff; Metering mode; Subsidy; Key (lock); Workflow; Feed-in tariff; Micro hydro","score_opus":0.021967154445346006,"score_gpt":0.24643677305907738,"score_spread":0.22446961861373138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415819116","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96514076,0.00009638674,0.01447452,0.0002998714,0.000017613278,0.00022011215,0.002472972,0.00042186293,0.016855858],"genre_scores_gemma":[0.9908716,0.00006221755,0.006434851,0.000018881936,0.0000032912828,0.000071766604,0.00064949197,0.000035913275,0.0018519871],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996649,0.000102857244,0.0000082035485,0.000050137027,0.00006400264,0.00010992685],"domain_scores_gemma":[0.9993774,0.00028050315,0.000054045788,0.000049461294,0.00014957742,0.00008893953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008064939,0.0009440235,0.00048009306,0.001030973,0.0010822925,0.0017656864,0.001534389,0.00087628054,0.0035962842],"category_scores_gemma":[0.0014509009,0.00039608666,0.00073347776,0.001492484,0.0007822854,0.0006040377,0.0006555226,0.0005370188,0.00018556055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005159267,0.00008176302,0.008081255,0.000022805918,0.000031786873,0.00010543027,0.000043754993,0.985927,0.0005099097,0.0015985135,0.0005494584,0.0029968498],"study_design_scores_gemma":[0.000023250686,0.000037820297,0.0042535807,0.0000047035874,0.000014939974,0.0000063591,0.0001129254,0.99445194,0.00034589393,0.00022290972,0.00050870137,0.000017018127],"about_ca_topic_score_codex":0.89766157,"about_ca_topic_score_gemma":0.89892334,"teacher_disagreement_score":0.10233843,"about_ca_system_score_codex":0.016931763,"about_ca_system_score_gemma":0.0075220177,"threshold_uncertainty_score":0.20588219},"labels":[],"label_agreement":null},{"id":"W4416136419","doi":"10.1109/pesgm52009.2025.11225144","title":"Electrification in Residential Buildings using Distributionally Robust Optimization","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"HVAC; Electrification; Robust optimization; Demand response; Scheduling (production processes); Electric power system; Robustness (evolution); Peak demand; Energy management","score_opus":0.010807444581076766,"score_gpt":0.22618053679072456,"score_spread":0.2153730922096478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416136419","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033453953,0.0001733931,0.9615128,0.00014119268,0.000018490131,0.000024053112,0.000036316134,0.00018422147,0.004455491],"genre_scores_gemma":[0.97043735,0.00014236018,0.02753562,0.000034923178,0.000020322077,0.000038433634,0.00004955019,0.00003857946,0.0017028552],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997662,0.00009602266,0.000009955981,0.000051150295,0.000051054285,0.000025668844],"domain_scores_gemma":[0.99973553,0.00014450632,0.00005241109,0.000017213337,0.00003782255,0.000012549916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049137586,0.00062812667,0.00063163135,0.0002821524,0.00022734902,0.00073006353,0.0004095665,0.00047449226,0.0009038781],"category_scores_gemma":[0.0008925293,0.00029193202,0.0005308322,0.00025980544,0.0004700421,0.0006104184,0.0008504831,0.0005642879,0.000118021446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073403035,0.0000062235304,0.00008155255,0.000008036829,0.00000822966,0.000013257101,0.0000059655363,0.9940837,0.0004088626,0.0016656532,0.0000590734,0.0036520609],"study_design_scores_gemma":[0.0000010554847,0.0000063464818,0.00002200609,6.624471e-7,0.0000011759387,0.000001860528,0.000001996748,0.99916923,0.00009485924,0.00063373137,0.00006600307,0.000001090721],"about_ca_topic_score_codex":0.0038035435,"about_ca_topic_score_gemma":0.0028283508,"teacher_disagreement_score":0.0038035435,"about_ca_system_score_codex":0.00043159057,"about_ca_system_score_gemma":0.00040520297,"threshold_uncertainty_score":0.007562816},"labels":[],"label_agreement":null},{"id":"W4416291673","doi":"10.29173/alr2877","title":"Data Centres, AI, and Electrification — Legal and Corporate Approaches to Growing Power Demands in Canada","year":2025,"lang":"","type":"article","venue":"Alberta Law Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Renewable Energy Laboratory","keywords":"Electrification; Electricity; Legislature; Investment (military); Construct (python library); Shareholder; Electricity generation; Energy law; Generative grammar","score_opus":0.04648796634822885,"score_gpt":0.2231261709297732,"score_spread":0.17663820458154433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416291673","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14442697,0.015735488,0.0029069844,0.11495978,0.0005011627,0.0001604536,0.0006367812,0.000096223834,0.72057617],"genre_scores_gemma":[0.84321374,0.014417865,0.0016833371,0.016046163,0.0001624204,0.00004219859,0.00019058716,0.000060641156,0.12418293],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99661046,0.00025123137,0.00009901908,0.00022402142,0.0016367265,0.0011785004],"domain_scores_gemma":[0.9947001,0.0018432441,0.00023198329,0.00015398266,0.0022884207,0.00078229955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020032104,0.00023118751,0.00022655075,0.0026797338,0.015900511,0.010580437,0.0024106782,0.003879253,0.007095001],"category_scores_gemma":[0.0058489377,0.00045566758,0.00038031195,0.0041981973,0.008657795,0.0018651161,0.0021590004,0.004917454,0.00020697372],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001686368,0.000040262807,0.0041322936,0.000107521184,0.0000150663045,0.00085004885,0.003632916,0.003252524,0.00040708343,0.9343226,0.032086574,0.021136288],"study_design_scores_gemma":[0.00004241697,0.00003076758,0.04043906,0.00062735163,0.00005726015,0.00046879362,0.024803763,0.009755182,0.0009832265,0.06783076,0.85475874,0.00020272181],"about_ca_topic_score_codex":0.9952602,"about_ca_topic_score_gemma":0.99755186,"teacher_disagreement_score":0.16266891,"about_ca_system_score_codex":0.16266891,"about_ca_system_score_gemma":0.19555128,"threshold_uncertainty_score":0.9711854},"labels":[],"label_agreement":null},{"id":"W4416341996","doi":"10.1109/epec65543.2025.11230430","title":"Meta-Reinforcement Learning for Building Energy Management System","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; McGill University","funders":"","keywords":"Reinforcement learning; Control (management); Efficient energy use; Key (lock); Adaptation (eye); Energy management; Baseline (sea); Renewable energy","score_opus":0.01745634665836238,"score_gpt":0.22171423892839148,"score_spread":0.2042578922700291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416341996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043836266,0.0013769896,0.9451137,0.00047612094,0.00013583091,0.000087544024,0.00013144623,0.0016397288,0.00720235],"genre_scores_gemma":[0.95298743,0.00022404142,0.04438585,0.00014278133,0.00003659567,0.000118178694,0.0001160608,0.000040197614,0.0019489027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971884,0.00007775058,0.00001751467,0.00007155324,0.00006353362,0.00005079787],"domain_scores_gemma":[0.99955004,0.00021178035,0.0000688168,0.000040784,0.000093738054,0.00003466523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007130203,0.00076438667,0.0008804863,0.00036830248,0.00030223659,0.0006788915,0.0010346886,0.00081627944,0.00289015],"category_scores_gemma":[0.0014258064,0.0003069607,0.0005295683,0.0002968153,0.00045125687,0.00054522755,0.0008068441,0.0010662087,0.00041459425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044273027,0.000043121338,0.00048249259,0.00004206122,0.000031095708,0.00004380399,0.000018258706,0.96460253,0.0010154421,0.0018662587,0.00062719674,0.031183472],"study_design_scores_gemma":[0.0000047657804,0.000015056759,0.000063122636,0.000003056578,0.000004053264,0.0000055131964,0.0000017027529,0.9986553,0.0001749201,0.00087264675,0.0001979305,0.0000018339565],"about_ca_topic_score_codex":0.0054424414,"about_ca_topic_score_gemma":0.0052732015,"teacher_disagreement_score":0.0054424414,"about_ca_system_score_codex":0.00068871933,"about_ca_system_score_gemma":0.0008417363,"threshold_uncertainty_score":0.010821521},"labels":[],"label_agreement":null},{"id":"W4416342144","doi":"10.1109/epec65543.2025.11230417","title":"Auction-Based DER Markets: Learnings from the York Region NWA Demonstration","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Resource (disambiguation); Key (lock); Common value auction; Electricity; Grid; Energy market; Electricity market; Service (business)","score_opus":0.00925866411837727,"score_gpt":0.1941686266289476,"score_spread":0.18490996251057032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8582982,0.0008752586,0.021643449,0.015569074,0.000143499,0.00015665786,0.00026129582,0.00018198852,0.102870606],"genre_scores_gemma":[0.98327786,0.0005608832,0.005998977,0.00025741776,0.000028582635,0.000055303302,0.00010035885,0.00002648885,0.009694053],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99922144,0.00039570124,0.0000128986085,0.000071588685,0.00018411683,0.00011426177],"domain_scores_gemma":[0.99754745,0.0013794117,0.00012408487,0.00017765946,0.0004986685,0.0002728564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033702783,0.00019924734,0.00025208047,0.00018218707,0.0009293809,0.0015396256,0.0007106145,0.00068765227,0.0045311456],"category_scores_gemma":[0.004241452,0.00011406962,0.00018350965,0.0001999492,0.0016116083,0.002197944,0.0011031996,0.0013251966,0.00039050574],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019106499,0.0028335687,0.032392412,0.0005530897,0.00012066596,0.002903026,0.007955087,0.17519966,0.015639212,0.47764593,0.07306012,0.20978662],"study_design_scores_gemma":[0.0010951832,0.0035251472,0.036858585,0.00041794244,0.00006801532,0.0005463673,0.025411231,0.3999887,0.01687775,0.2333886,0.28148094,0.00034152303],"about_ca_topic_score_codex":0.034599654,"about_ca_topic_score_gemma":0.07334531,"teacher_disagreement_score":0.96540034,"about_ca_system_score_codex":0.0027777927,"about_ca_system_score_gemma":0.002459489,"threshold_uncertainty_score":0.068796515},"labels":[],"label_agreement":null},{"id":"W4416342332","doi":"10.1109/epec65543.2025.11230441","title":"Assessing Heating Electrification Trade-Offs Using Data-Driven Modelling for Future Grid Planning","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Mitacs","keywords":"Thermostat; Electrification; Backup; Demand response; Electric heating; Electricity; Grid; Smart grid; Work (physics)","score_opus":0.0816992017860686,"score_gpt":0.323569486642245,"score_spread":0.2418702848561764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7652492,0.00068218587,0.20718125,0.0023686085,0.000117959586,0.00036376846,0.009415283,0.00085562177,0.0137661975],"genre_scores_gemma":[0.9682255,0.00019547183,0.028184857,0.00006146859,0.000012818017,0.00018196866,0.0023331582,0.00005172064,0.00075298204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995346,0.00027787915,0.000026946243,0.00006152435,0.00005509046,0.000044082244],"domain_scores_gemma":[0.99708337,0.002164675,0.00017411128,0.0001696322,0.00031743856,0.00009067721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022357628,0.00094975403,0.0008023855,0.00078545144,0.00029526942,0.0014257724,0.0010731387,0.001285475,0.001953996],"category_scores_gemma":[0.004825442,0.00072279613,0.0011068038,0.0012082062,0.0003301011,0.0017327344,0.0005156782,0.0012769422,0.00022051005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015635276,0.000015476791,0.001176172,0.000015501017,0.000017785516,0.000013191435,0.0000062016093,0.99670583,0.00008482698,0.00062720175,0.00012048585,0.0012017],"study_design_scores_gemma":[0.000004317638,0.000009625296,0.00038862563,0.0000052988967,0.0000049034315,0.0000021646792,0.000016120062,0.99837273,0.00012337712,0.0008632501,0.0002043772,0.000005310086],"about_ca_topic_score_codex":0.035355404,"about_ca_topic_score_gemma":0.0394711,"teacher_disagreement_score":0.035355404,"about_ca_system_score_codex":0.0021036111,"about_ca_system_score_gemma":0.00136464,"threshold_uncertainty_score":0.07029921},"labels":[],"label_agreement":null},{"id":"W4416342333","doi":"10.1109/epec65543.2025.11230454","title":"Modified Energy Management System for Virtual Power Plant Applications","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Virtual power plant; Electricity market; Scheduling (production processes); Renewable energy; Profit (economics); Electricity; Energy management; Electric power system; Energy management system","score_opus":0.006481152639383078,"score_gpt":0.1964978685293445,"score_spread":0.19001671588996144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036088288,0.0002224531,0.9408719,0.0001448154,0.00024105661,0.00023650964,0.00021654944,0.0054476126,0.016530689],"genre_scores_gemma":[0.87379223,0.000114008326,0.116777815,0.00011617281,0.00005950964,0.00022022758,0.00028114612,0.00011747004,0.008521437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998129,0.000038204395,0.000020157082,0.000047099886,0.000068379515,0.0000132231835],"domain_scores_gemma":[0.99983954,0.000034792956,0.000021976315,0.000040883253,0.000052835207,0.0000100614625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022876589,0.00036297415,0.00036329092,0.00029430797,0.00036091884,0.00070515793,0.000995486,0.00039835356,0.00564277],"category_scores_gemma":[0.00056177477,0.00014967874,0.00021684385,0.00022734188,0.00015961503,0.00053218997,0.00043423273,0.00043787045,0.0013418512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047337406,0.00031065478,0.0016168184,0.00017812595,0.000060939634,0.00048655865,0.00011268717,0.5160559,0.036354207,0.016394136,0.009817523,0.41813913],"study_design_scores_gemma":[0.000023674342,0.00006211169,0.0002459066,0.000004593719,0.000008555745,0.00006950728,0.000005538642,0.9887405,0.0035257381,0.0015643868,0.005740504,0.00000895105],"about_ca_topic_score_codex":0.0013232065,"about_ca_topic_score_gemma":0.0021213898,"teacher_disagreement_score":0.00564277,"about_ca_system_score_codex":0.00021272828,"about_ca_system_score_gemma":0.0003377285,"threshold_uncertainty_score":0.01887697},"labels":[],"label_agreement":null},{"id":"W4416342360","doi":"10.1109/epec65543.2025.11230410","title":"Multi-Objective Optimization of Thermal Energy Storage in Buildings Through Load Decomposition","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Smoothing; Thermal energy storage; Thermal; Filter (signal processing); Peaking power plant; Energy storage; Parametric statistics; Optimization problem; Pareto principle; Energy (signal processing)","score_opus":0.007216132752423034,"score_gpt":0.23518102980909739,"score_spread":0.22796489705667436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342360","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15000895,0.00043441678,0.8422592,0.00018662719,0.000029110359,0.00008087576,0.00010103687,0.00019950545,0.006700311],"genre_scores_gemma":[0.91782534,0.00019904457,0.07916282,0.000041365398,0.000013108295,0.00010924981,0.00010010079,0.000058994676,0.0024899682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972683,0.00011840208,0.000008264563,0.000031295967,0.000069382564,0.000045878325],"domain_scores_gemma":[0.9995844,0.00027926388,0.0000415377,0.000017444258,0.00005516323,0.000022135973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001002089,0.0009256631,0.0007801861,0.00053233124,0.00030009204,0.0009992903,0.00045142916,0.0006535941,0.0011485372],"category_scores_gemma":[0.0012492185,0.00037270325,0.00063116493,0.0005767241,0.0005128676,0.00059750304,0.00065640634,0.00057918485,0.00013770346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010378743,0.000009053243,0.000095350086,0.0000098467435,0.000006644391,0.000008274317,0.0000051169995,0.99618524,0.00038966828,0.0005887239,0.000051299656,0.0026403845],"study_design_scores_gemma":[0.0000019875245,0.000007607632,0.000051280585,0.0000011988745,0.0000014771379,0.0000011394685,0.0000039898096,0.99944645,0.00012345186,0.00031691202,0.00004347829,0.0000010725479],"about_ca_topic_score_codex":0.010920514,"about_ca_topic_score_gemma":0.009554804,"teacher_disagreement_score":0.010920514,"about_ca_system_score_codex":0.00083932234,"about_ca_system_score_gemma":0.0012613313,"threshold_uncertainty_score":0.021713912},"labels":[],"label_agreement":null},{"id":"W4416342703","doi":"10.1109/epec65543.2025.11230378","title":"Two-Stage Probabilistic Framework for Electricity Price Prediction in Competitive Markets","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ballard Power Systems (Canada)","funders":"","keywords":"Estimator; Probabilistic logic; Probability density function; Nonparametric statistics; Electricity; Nonlinear system; Feature (linguistics); Density estimation; Function (biology)","score_opus":0.008260372588360713,"score_gpt":0.2404323245690548,"score_spread":0.2321719519806941,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010208795,0.00022132731,0.9882478,0.00016345835,0.000020619047,0.000025722096,0.000077191864,0.00024467643,0.0007905359],"genre_scores_gemma":[0.83965755,0.00066158455,0.15261877,0.0001775906,0.00016352285,0.00027341605,0.00042137704,0.00012875047,0.005897387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993057,0.00025397836,0.000035621073,0.0001558025,0.0001493499,0.00009943555],"domain_scores_gemma":[0.9986659,0.00088575826,0.0001335244,0.000063620144,0.00020285769,0.000048280253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023763878,0.0009849938,0.0012195214,0.00072567037,0.00043977436,0.0011962388,0.0026824663,0.0015766586,0.0026192751],"category_scores_gemma":[0.004267195,0.0010717232,0.0010977696,0.0008347696,0.0009517904,0.0023178747,0.0012187939,0.0013768262,0.00047359534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044119082,0.000026321053,0.00070224423,0.000032353073,0.00003775523,0.000076933306,0.00002968491,0.96197295,0.0005039329,0.01870423,0.0004207926,0.017448787],"study_design_scores_gemma":[0.0000012464358,0.000004159904,0.000041022657,6.54291e-7,0.0000018576728,0.000004148285,9.375799e-7,0.99833256,0.000044619068,0.0015142123,0.00005248509,0.0000020985387],"about_ca_topic_score_codex":0.009404217,"about_ca_topic_score_gemma":0.0078019938,"teacher_disagreement_score":0.009404217,"about_ca_system_score_codex":0.0007681122,"about_ca_system_score_gemma":0.0012425251,"threshold_uncertainty_score":0.01869893},"labels":[],"label_agreement":null},{"id":"W4416342782","doi":"10.1109/epec65543.2025.11230427","title":"Augmented Capacity Market Design Including Demand Response, Import and Transmission Capacity Enhancement","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Capacity planning; Arbitrage; Capacity management; Transmission (telecommunications); Nameplate capacity; Carrying capacity","score_opus":0.030718453373848622,"score_gpt":0.2410013161068552,"score_spread":0.2102828627330066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342782","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02266968,0.00025681074,0.958356,0.0003314089,0.000117585616,0.00016721866,0.00017238712,0.00015960376,0.017769314],"genre_scores_gemma":[0.92184854,0.0003924521,0.06570466,0.000108444525,0.00011481837,0.00026152673,0.0001321124,0.00006905636,0.011368451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99877733,0.0004857507,0.000036650952,0.00021556475,0.00027157812,0.00021304522],"domain_scores_gemma":[0.99900156,0.00038401294,0.00017745886,0.00008507378,0.00024339078,0.00010851299],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015200336,0.0011634256,0.001187475,0.0005018031,0.0005149917,0.002368625,0.0026199962,0.0013607965,0.0068279696],"category_scores_gemma":[0.0021059827,0.00063846295,0.0009605263,0.0007850077,0.0011863965,0.0039177346,0.0013688405,0.0016743707,0.0006048955],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056179113,0.000044616467,0.000101380705,0.00007036803,0.000023338074,0.00019408531,0.00002512502,0.9012432,0.0014470025,0.09145421,0.000869165,0.004471282],"study_design_scores_gemma":[0.000011247835,0.00003565148,0.000026562591,0.0000040647433,0.0000067058095,0.0000341616,0.000008046189,0.98777336,0.00018044192,0.010962344,0.0009498335,0.0000075972066],"about_ca_topic_score_codex":0.003761404,"about_ca_topic_score_gemma":0.0029421581,"teacher_disagreement_score":0.0068279696,"about_ca_system_score_codex":0.0014707351,"about_ca_system_score_gemma":0.0024279093,"threshold_uncertainty_score":0.02284187},"labels":[],"label_agreement":null},{"id":"W4416342975","doi":"10.1109/epec65543.2025.11230403","title":"Modeling and Estimation of the State of Charge of Electric Water Heater Tanks for Demand Response: A Kalman filter-Based Approach","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Natural Resources Canada","funders":"","keywords":"Kalman filter; State of charge; Extended Kalman filter; Discretization; Nonlinear system; Control theory (sociology); Invariant extended Kalman filter; Thermal; State (computer science)","score_opus":0.010707310323022835,"score_gpt":0.21595194240614424,"score_spread":0.2052446320831214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342975","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020927519,0.00009831055,0.97739947,0.00007913182,0.000017514014,0.0000190984,0.000050067327,0.00023089908,0.001177979],"genre_scores_gemma":[0.9447361,0.00033367606,0.052375644,0.00004025752,0.00002888515,0.000071775416,0.00013852103,0.00003240767,0.0022427551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998385,0.000034953257,0.0000132655705,0.000046069927,0.000050497172,0.000016744867],"domain_scores_gemma":[0.99965847,0.00018531886,0.000056185323,0.00002299444,0.00007018786,0.0000069615326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043025718,0.00047784953,0.00046527915,0.00030142508,0.00022934396,0.00074063725,0.00054607185,0.0004698119,0.0009043554],"category_scores_gemma":[0.0012833098,0.00032646846,0.0003983397,0.0002461,0.00034249632,0.0010327583,0.00038504472,0.0005812695,0.00022153762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005813074,0.000026905913,0.0012740764,0.00006463885,0.000028073753,0.000034171542,0.00006476992,0.9537585,0.0064066206,0.0040160296,0.0003248306,0.033943392],"study_design_scores_gemma":[0.0000024135252,0.000008576657,0.0002531771,0.000002904157,0.000003955417,0.0000038920593,0.0000059312415,0.9980578,0.0008762798,0.0005648824,0.00021561807,0.0000044717763],"about_ca_topic_score_codex":0.012454797,"about_ca_topic_score_gemma":0.0098861735,"teacher_disagreement_score":0.012454797,"about_ca_system_score_codex":0.00057952333,"about_ca_system_score_gemma":0.0007790126,"threshold_uncertainty_score":0.024764597},"labels":[],"label_agreement":null},{"id":"W4416429257","doi":"10.1109/thms.2025.3627893","title":"Adaptive Weighted Federated Domain Adaptation Methods for Nonintrusive Load Monitoring","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Human-Machine Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Weighting; Scalability; Adaptation (eye); Domain (mathematical analysis); Context (archaeology); Similarity (geometry); Raw data; Coding (social sciences); Similarity measure","score_opus":0.03830626402564625,"score_gpt":0.3343307092553955,"score_spread":0.29602444522974924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416429257","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014499125,0.0001791888,0.9836105,0.000096120806,0.00003099971,0.000017460185,0.000034142275,0.0010328749,0.0004996048],"genre_scores_gemma":[0.66090596,0.00019979489,0.33550754,0.00025020444,0.00007170535,0.000108091204,0.00027323523,0.00023260046,0.0024507684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911517,0.00025848474,0.0000429673,0.00024143388,0.000259638,0.00008221944],"domain_scores_gemma":[0.99827886,0.0006998887,0.00019532283,0.00046112243,0.00029326353,0.00007168189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001464762,0.0006913959,0.0009678952,0.00046716057,0.00035685734,0.00081419904,0.0017783856,0.0007691313,0.001240051],"category_scores_gemma":[0.0048609287,0.00032255828,0.0006046961,0.0006554086,0.0007460557,0.0019976231,0.0015091836,0.0017050722,0.00048078437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002915836,0.00021767977,0.0022832495,0.000077379795,0.00010039698,0.00011188425,0.00018720028,0.613415,0.011761821,0.010641819,0.003598241,0.35731375],"study_design_scores_gemma":[0.0000054311517,0.000013747229,0.00012201314,0.0000029314238,0.0000032786334,0.00001897847,0.0000092409555,0.9939401,0.0017900604,0.0036148785,0.00047357706,0.000005771647],"about_ca_topic_score_codex":0.0030540614,"about_ca_topic_score_gemma":0.003280065,"teacher_disagreement_score":0.0030540614,"about_ca_system_score_codex":0.0006748424,"about_ca_system_score_gemma":0.00094431854,"threshold_uncertainty_score":0.0077465177},"labels":[],"label_agreement":null},{"id":"W4416436949","doi":"10.1016/j.epsr.2025.112502","title":"Smart contract-driven trading in a wholesale electricity market with multi-aggregator coordination in a Private Blockchain platform based on Ethereum","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Blockchain; Database transaction; Smart contract; Cryptocurrency; Electricity; Demand response; Electricity market; Hash function; Renewable energy","score_opus":0.020087408871530096,"score_gpt":0.27271214194548205,"score_spread":0.25262473307395195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416436949","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42179787,0.00022606265,0.56059504,0.00074011064,0.00019238767,0.00026126747,0.00022964035,0.0009521756,0.015005514],"genre_scores_gemma":[0.9804205,0.000034825793,0.017098948,0.00003475048,0.000010544642,0.000034716,0.000044397104,0.000020614698,0.002300658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990926,0.00030683947,0.00004852235,0.00016010767,0.000222434,0.00016955892],"domain_scores_gemma":[0.9987319,0.0006569007,0.00007711935,0.00024373381,0.00014748843,0.00014284984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014820138,0.00031380667,0.00094458123,0.00025428995,0.0007565763,0.0013586585,0.0011358628,0.0010829149,0.004973587],"category_scores_gemma":[0.0021996305,0.00032662536,0.00039779345,0.00036538896,0.0009358316,0.0019230521,0.001742282,0.0010579067,0.0004800242],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020160691,0.0005901962,0.0018684734,0.00015134281,0.0000951586,0.0012795803,0.00029363483,0.7974067,0.021213952,0.10974085,0.002837732,0.06250639],"study_design_scores_gemma":[0.000063398256,0.000053930034,0.000092043214,0.0000034458403,0.000006229045,0.0000364365,0.000016778326,0.9830973,0.0019019371,0.014183532,0.0005356442,0.000009308092],"about_ca_topic_score_codex":0.0023302555,"about_ca_topic_score_gemma":0.0037287765,"teacher_disagreement_score":0.004973587,"about_ca_system_score_codex":0.0005311002,"about_ca_system_score_gemma":0.0016956887,"threshold_uncertainty_score":0.016638339},"labels":[],"label_agreement":null},{"id":"W4416525759","doi":"10.1016/b978-0-443-36459-4.00016-6","title":"Emerging trends: Artificial intelligence, deep learning, big data, and the role of digital twins applied to energy communities","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Big data; Scalability; Renewable energy; Electricity; Energy consumption; Efficient energy use; Energy (signal processing); Reinforcement learning","score_opus":0.01739317172312559,"score_gpt":0.21286261331840714,"score_spread":0.19546944159528154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416525759","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012946062,0.24803625,0.062286146,0.09764211,0.009582914,0.000056526365,0.0005779397,0.00057157216,0.5683004],"genre_scores_gemma":[0.23771375,0.29166064,0.04476034,0.012703241,0.009048491,0.00013935551,0.00092700694,0.0003949016,0.4026522],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997658,0.000061570754,0.000010697005,0.00003252711,0.0001024701,0.000026836466],"domain_scores_gemma":[0.9991351,0.00055334053,0.000042818683,0.000070609945,0.00010225136,0.00009588209],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006328748,0.0003802271,0.0003814953,0.0012050105,0.0007326549,0.0057599843,0.0007081915,0.0016193427,0.016062438],"category_scores_gemma":[0.0019259938,0.00018987957,0.00030217695,0.003318683,0.002142869,0.009923414,0.0015342853,0.0025637273,0.002073633],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014628241,0.0000344683,0.0003639745,0.00023821309,0.000010271141,0.00005326314,0.0003751916,0.00090152316,0.00022084602,0.74129254,0.10384701,0.15264802],"study_design_scores_gemma":[0.000002841973,0.000009202619,0.00037862433,0.000307292,0.000004149908,0.000115461335,0.00069079874,0.0040534884,0.00015245375,0.6182819,0.37599492,0.000008801046],"about_ca_topic_score_codex":0.0022976843,"about_ca_topic_score_gemma":0.0055240677,"teacher_disagreement_score":0.016062438,"about_ca_system_score_codex":0.001422462,"about_ca_system_score_gemma":0.0014474508,"threshold_uncertainty_score":0.053734183},"labels":[],"label_agreement":null},{"id":"W4416704827","doi":"10.26868/25222708.2025.1274","title":"Case study of residential energy management systems with solar PV, wind and battery energy storage","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund","keywords":"Energy management; Renewable energy; Model predictive control; Energy management system; Energy consumption; Demand response; Efficient energy use; Work (physics); Control (management)","score_opus":0.015106665608649168,"score_gpt":0.23698643181677367,"score_spread":0.2218797662081245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96880203,0.00009951321,0.015204626,0.0003119419,0.000023975823,0.0003122056,0.00050321524,0.00023282674,0.014509621],"genre_scores_gemma":[0.9933264,0.000042238793,0.0042581446,0.000018068693,0.0000036247247,0.000051902603,0.00011587494,0.0000106542075,0.0021730333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9994097,0.0002683447,0.000030223115,0.00006950477,0.00013190872,0.00009029403],"domain_scores_gemma":[0.99916077,0.00045182716,0.000050778905,0.000089849746,0.00015599473,0.00009076402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005992582,0.00055947254,0.00041034925,0.0004196517,0.0015273917,0.00085305993,0.0012751239,0.0011067794,0.0035812946],"category_scores_gemma":[0.001160617,0.00030150727,0.00048126213,0.00087562035,0.00067841314,0.0010052928,0.0007105261,0.00066230405,0.0003341779],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008082293,0.0016057556,0.0366912,0.00032029484,0.00013690267,0.0066470676,0.00085112645,0.9031008,0.0066402815,0.01165204,0.004857469,0.02668889],"study_design_scores_gemma":[0.0003013145,0.0007983245,0.015472006,0.000025871064,0.00007378961,0.00073748635,0.002459981,0.96116084,0.008016853,0.003623947,0.007280944,0.000048718543],"about_ca_topic_score_codex":0.044656117,"about_ca_topic_score_gemma":0.064103596,"teacher_disagreement_score":0.044656117,"about_ca_system_score_codex":0.0017080293,"about_ca_system_score_gemma":0.0012199164,"threshold_uncertainty_score":0.08879238},"labels":[],"label_agreement":null},{"id":"W4416704856","doi":"10.26868/25222708.2025.1489","title":"Investigating the full potential of demand response programs using granular occupancy schedules","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Occupancy; Thermostat; Demand response; Energy consumption; Reliability (semiconductor); Consumption (sociology); Demand patterns; Peak demand; Schedule","score_opus":0.02912049586779224,"score_gpt":0.28285674101332453,"score_spread":0.2537362451455323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91780806,0.00048713532,0.06960147,0.0010529942,0.00013823017,0.00024410633,0.0018865899,0.00055654405,0.008225019],"genre_scores_gemma":[0.9875349,0.00011879269,0.011476127,0.000063807965,0.000013048984,0.000051869967,0.00044906908,0.000022403701,0.00027002447],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990294,0.00048688077,0.000038689475,0.00017976851,0.0001316959,0.00013349047],"domain_scores_gemma":[0.99608743,0.002751707,0.00029045396,0.0004908836,0.00020664617,0.00017292514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020493553,0.00064656034,0.0005595293,0.00040518946,0.0002541319,0.0011450235,0.0012993723,0.0006949847,0.0011008559],"category_scores_gemma":[0.007348355,0.00039209652,0.0005890089,0.0005909906,0.00046004663,0.0013174446,0.0006144128,0.0008630118,0.00017018904],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012321021,0.00012518295,0.009596815,0.00006161641,0.000045393423,0.000030698793,0.000039013677,0.9781884,0.00048404967,0.0021980384,0.0005374451,0.008570209],"study_design_scores_gemma":[0.00002673977,0.00010924271,0.0017615568,0.0000085544125,0.000013568772,0.000011899436,0.00008843159,0.99565625,0.00039233573,0.0013060397,0.00061628106,0.000009174832],"about_ca_topic_score_codex":0.018473592,"about_ca_topic_score_gemma":0.020497603,"teacher_disagreement_score":0.018473592,"about_ca_system_score_codex":0.0011615892,"about_ca_system_score_gemma":0.0011165848,"threshold_uncertainty_score":0.036732137},"labels":[],"label_agreement":null},{"id":"W4416704924","doi":"10.26868/25222708.2025.1351","title":"Modelling the impact of occupant behaviour on direct load control of HVAC systems","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; Ministry of Colleges and Universities","keywords":"Thermostat; HVAC; Demand response; Robustness (evolution); Electricity; Python (programming language); Economizer; Load profile","score_opus":0.025513586704553625,"score_gpt":0.286436547522543,"score_spread":0.2609229608179894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704924","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.951535,0.00010707253,0.041779287,0.00011790229,0.000021258315,0.00005462402,0.00045043806,0.0001385204,0.00579594],"genre_scores_gemma":[0.99679923,0.000040218056,0.0019799694,0.000009301042,0.0000026143132,0.000016265361,0.00009269063,0.000013015019,0.0010466063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998184,0.000043386426,0.0000063982343,0.000037529706,0.00003830252,0.00005607268],"domain_scores_gemma":[0.99959713,0.00022342609,0.00005243248,0.000030807067,0.000062908235,0.000033275202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033134842,0.00054836244,0.00030634587,0.0001978285,0.00030095156,0.0005446806,0.00082445424,0.0005638091,0.0021096095],"category_scores_gemma":[0.0010985396,0.00032367493,0.00041409777,0.00020421989,0.000420075,0.00045509002,0.00043577698,0.0004726584,0.0002024807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037923146,0.000038728576,0.0040457277,0.000014032809,0.000008367579,0.000023848474,0.000030715695,0.9924034,0.000994608,0.0003670677,0.000104413804,0.0019311095],"study_design_scores_gemma":[0.000003625501,0.000027430906,0.0019903115,0.0000019986644,0.0000047606936,0.000005454551,0.000016724625,0.9973279,0.00036920383,0.00015708792,0.00009228085,0.000003194256],"about_ca_topic_score_codex":0.082683675,"about_ca_topic_score_gemma":0.072867714,"teacher_disagreement_score":0.082683675,"about_ca_system_score_codex":0.0011448876,"about_ca_system_score_gemma":0.0011067083,"threshold_uncertainty_score":0.16440481},"labels":[],"label_agreement":null},{"id":"W4416743012","doi":"10.1088/1742-6596/3140/6/062010","title":"Integrating Building Performance Simulation in Agent-based Models to Support Demand-side Management Strategies","year":2025,"lang":"","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Canada Research Chairs","keywords":"Setpoint; Renewable energy; Photovoltaic system; Energy management; Demand response; Building energy simulation; Tariff; Efficient energy use; Key (lock); Workflow","score_opus":0.029657047923466445,"score_gpt":0.2693091309536252,"score_spread":0.23965208303015875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416743012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1686207,0.00012184256,0.8047621,0.0005841118,0.00009916448,0.00027637446,0.0005293447,0.0015917633,0.023414517],"genre_scores_gemma":[0.9332882,0.000108088956,0.06335277,0.00004732769,0.000019194686,0.0002374611,0.00026439945,0.00008485715,0.0025976133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969935,0.00012221452,0.000016686872,0.000041469724,0.00008233989,0.000037975507],"domain_scores_gemma":[0.9990127,0.00051525026,0.00010972539,0.000117559866,0.00016374518,0.00008098819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073408755,0.0006120664,0.0006211216,0.00038881932,0.0004058331,0.0014065726,0.001271467,0.0009095719,0.0026743207],"category_scores_gemma":[0.0018407631,0.00044078,0.0005871461,0.00038755202,0.00052234804,0.0009598456,0.0009974869,0.0010309318,0.00041678225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009403653,0.000021223615,0.00026884553,0.000005258246,0.000005745647,0.000009879288,0.000009225368,0.99662787,0.00017640453,0.0017581369,0.00006593031,0.0010420606],"study_design_scores_gemma":[0.0000036156678,0.0000042914317,0.00003058736,0.0000011908468,0.0000014964025,9.842122e-7,0.000002741204,0.99909294,0.00007530724,0.0005952199,0.00019017124,0.0000014804378],"about_ca_topic_score_codex":0.014650667,"about_ca_topic_score_gemma":0.010617005,"teacher_disagreement_score":0.014650667,"about_ca_system_score_codex":0.00097653223,"about_ca_system_score_gemma":0.0014706776,"threshold_uncertainty_score":0.029130816},"labels":[],"label_agreement":null},{"id":"W4416759722","doi":"10.35833/mpce.2025.000807","title":"Smart Grid Origins, Definitions, Technologies, and Emerging Trends: A Power Community Perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Panacea (medicine); Smart grid; Perspective (graphical); Term (time); Electricity; Power grid","score_opus":0.015236522179596652,"score_gpt":0.22101395572892477,"score_spread":0.20577743354932812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416759722","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038819473,0.06232774,0.04063583,0.35357502,0.0019009588,0.00008712811,0.00017608992,0.00016229265,0.5023155],"genre_scores_gemma":[0.8500716,0.08392174,0.009820258,0.021166401,0.0031561207,0.00015730207,0.00017431026,0.00018474608,0.03134739],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99785125,0.00089273916,0.00008593715,0.00022412158,0.00068940356,0.00025651522],"domain_scores_gemma":[0.9967163,0.0019391496,0.00023721984,0.00018340493,0.00062485156,0.00029897477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004296129,0.00042927207,0.00037038483,0.0035214436,0.0034491182,0.011308086,0.001061809,0.0038628827,0.0046135164],"category_scores_gemma":[0.004840184,0.0002805208,0.00026669976,0.006251817,0.011622543,0.019451126,0.0046568336,0.0062261173,0.00048442243],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004703336,0.00001150686,0.000240517,0.00006735981,0.0000014740724,0.000098080964,0.0040054084,0.00023369491,0.00007995079,0.9804582,0.0035961496,0.011203084],"study_design_scores_gemma":[0.000008669832,0.000034673867,0.0006181537,0.00050863257,0.0000042387214,0.00026865548,0.017778097,0.0012412128,0.0001969013,0.4675566,0.51176393,0.000020216836],"about_ca_topic_score_codex":0.00486863,"about_ca_topic_score_gemma":0.004939307,"teacher_disagreement_score":0.011308086,"about_ca_system_score_codex":0.0046744333,"about_ca_system_score_gemma":0.0039578876,"threshold_uncertainty_score":0.03391558},"labels":[],"label_agreement":null},{"id":"W4416799821","doi":"10.1109/snpd65828.2025.11252948","title":"Peer-to-Peer Energy Trading in a Local Energy Market Using Quantum Reinforcement Learning","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Algoma University; Thompson Rivers University","funders":"","keywords":"Reinforcement learning; Renewable energy; Electricity; Energy (signal processing); Energy market; Photovoltaic system; Energy consumption; Distributed generation","score_opus":0.011821009846292262,"score_gpt":0.23003282949221232,"score_spread":0.21821181964592007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416799821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20565669,0.00039377762,0.7866408,0.0006212253,0.000054814125,0.00011826423,0.00003813324,0.00037828117,0.0060979216],"genre_scores_gemma":[0.9799447,0.00006415255,0.018909436,0.000054102555,0.0000074453787,0.000051241546,0.000012276209,0.000010699008,0.00094586995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942434,0.00024760695,0.000021846747,0.00008720276,0.00011728662,0.0001017881],"domain_scores_gemma":[0.9978581,0.0014734872,0.0002122787,0.000104882725,0.00021951293,0.00013165947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001366455,0.0004922126,0.0011453768,0.00024950213,0.0006425333,0.00079840655,0.0009996841,0.00078939385,0.0017662361],"category_scores_gemma":[0.00321122,0.00030585937,0.00036342512,0.0003256733,0.0013928813,0.0011662641,0.0009277716,0.000981644,0.00016111476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007205628,0.000047680784,0.00039182953,0.000020130445,0.00001986619,0.000051562252,0.000026468519,0.98444116,0.0006152337,0.0073208394,0.00020648341,0.0067866533],"study_design_scores_gemma":[0.000008521194,0.000011214407,0.000025842592,8.5250906e-7,0.0000019522652,0.0000033136894,0.0000027952642,0.99822634,0.00009572676,0.0015815394,0.000040193594,0.0000016691031],"about_ca_topic_score_codex":0.0067285704,"about_ca_topic_score_gemma":0.004647721,"teacher_disagreement_score":0.0067285704,"about_ca_system_score_codex":0.0009475726,"about_ca_system_score_gemma":0.0013464149,"threshold_uncertainty_score":0.013378799},"labels":[],"label_agreement":null},{"id":"W4416799870","doi":"10.1109/snpd65828.2025.11253849","title":"Peer-to-Peer Renewable Energy Trading Using Agent-Based Modelling","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algoma University; University of Ottawa","funders":"","keywords":"Renewable energy; Work (physics); Matching (statistics); Grid; Electricity; Distributed generation; Photovoltaic system; Key (lock); Solar energy","score_opus":0.03066866312993615,"score_gpt":0.23984324155441789,"score_spread":0.20917457842448173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416799870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13160715,0.0005687832,0.8283108,0.0010896742,0.00018898083,0.00037311375,0.0005584012,0.0007262555,0.03657688],"genre_scores_gemma":[0.9491855,0.00028459012,0.0431097,0.00008010187,0.000032471544,0.00026523604,0.00015749372,0.000049163686,0.0068357605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999534,0.00020209688,0.000023769826,0.00008678453,0.00009427598,0.00005912037],"domain_scores_gemma":[0.99874413,0.0008204971,0.00014958018,0.00006688771,0.00013698067,0.000081868406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007041794,0.0007174005,0.0010325896,0.0004030022,0.0007473383,0.0019143068,0.0018382471,0.0016857273,0.0038264988],"category_scores_gemma":[0.0023569637,0.00055381225,0.00089014956,0.0005899958,0.0008403527,0.0015493296,0.0013564308,0.0010422638,0.00043483565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012503315,0.00001559105,0.00022933196,0.0000130816225,0.0000133649755,0.000039219296,0.000019767605,0.9926777,0.00015093078,0.0053818645,0.00014616761,0.0013004907],"study_design_scores_gemma":[0.000007386103,0.00000619193,0.00003710162,0.0000019514416,0.000002745224,0.0000047922967,0.000008081409,0.9973677,0.00003475441,0.0022417316,0.00028452184,0.0000030919773],"about_ca_topic_score_codex":0.019633565,"about_ca_topic_score_gemma":0.015088867,"teacher_disagreement_score":0.019633565,"about_ca_system_score_codex":0.001079577,"about_ca_system_score_gemma":0.0013027677,"threshold_uncertainty_score":0.03903854},"labels":[],"label_agreement":null},{"id":"W4416873307","doi":"10.1109/icdcsw63273.2025.00105","title":"A Federated Learning Approach with Spiking Neurons and Clustering for Smart Meter Data","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Cluster analysis; Overhead (engineering); Big data; Transmission (telecommunications); Artificial neural network; Smart meter; Data aggregator; Consumption (sociology); Energy consumption","score_opus":0.0246726493018694,"score_gpt":0.22514987550600996,"score_spread":0.20047722620414055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416873307","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055070534,0.00034527673,0.9407461,0.00040396804,0.0000681737,0.00003357245,0.00022110852,0.0017528228,0.0013584156],"genre_scores_gemma":[0.8323096,0.00022829944,0.16420178,0.00023820892,0.000052512627,0.00008888527,0.00055144925,0.00009096405,0.0022384222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966395,0.000068793415,0.000025309082,0.00012634908,0.00007309024,0.00004256877],"domain_scores_gemma":[0.99933016,0.00021865999,0.00006939672,0.00014305352,0.0001984494,0.000040202984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007957732,0.0006190151,0.0007784635,0.0005324505,0.00042844977,0.0007499769,0.0017976383,0.00096583134,0.00093540497],"category_scores_gemma":[0.0027992625,0.0003669677,0.0007664644,0.00095969613,0.00046124693,0.00134833,0.0010263734,0.0011887499,0.00025856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000893429,0.00005769798,0.0018192481,0.000029374994,0.00006069737,0.00008127451,0.00006164028,0.8827746,0.00262813,0.0040038344,0.0010523448,0.107341826],"study_design_scores_gemma":[0.0000017984842,0.0000062486097,0.00009593819,0.0000014612332,0.00000276523,0.0000064463165,0.0000038101732,0.9972172,0.00042499157,0.0021119309,0.00012491619,0.0000025916902],"about_ca_topic_score_codex":0.01004846,"about_ca_topic_score_gemma":0.011897525,"teacher_disagreement_score":0.01004846,"about_ca_system_score_codex":0.0008833303,"about_ca_system_score_gemma":0.0009597194,"threshold_uncertainty_score":0.019979894},"labels":[],"label_agreement":null},{"id":"W4416966289","doi":"10.1016/j.erss.2025.104474","title":"Designing effective demand response: A review of behavioral insights, consumer engagement, and operational strategies in energy systems","year":2025,"lang":"en","type":"article","venue":"Energy Research & Social Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"University of Michigan","keywords":"Consumer behaviour; Consumption (sociology); Electrification; Psychological intervention; Demand response; Cognition; Population; Mains electricity; Consumer demand; Supply and demand","score_opus":0.042166440388394726,"score_gpt":0.36420250910360313,"score_spread":0.3220360687152084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416966289","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004885727,0.996161,0.0012186347,0.00086302747,0.00009423342,0.000031550673,0.000026056787,0.000008116982,0.0011087798],"genre_scores_gemma":[0.0049534626,0.9925339,0.0017018956,0.00046078005,0.0000737594,0.000067605055,0.00002846815,0.0000061600053,0.00017400713],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960951,0.0019768053,0.0006977722,0.00035921112,0.0007528921,0.00011826258],"domain_scores_gemma":[0.9792031,0.018599188,0.00078586634,0.00019681653,0.0010710828,0.00014389413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005887917,0.0013761988,0.0020814955,0.0045946185,0.0005573406,0.0024005168,0.0012461381,0.0021054368,0.0026377763],"category_scores_gemma":[0.011699029,0.00073854043,0.0013988008,0.006402508,0.0016044505,0.003151183,0.0011321773,0.002322263,0.0005009565],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090545014,0.00025639316,0.00071496447,0.15120398,0.0003292863,0.000088485,0.0014210144,0.0014741397,0.00059426733,0.017113006,0.0065220925,0.82019186],"study_design_scores_gemma":[0.00006793662,0.0006527715,0.009417649,0.26291588,0.0017718491,0.0006270291,0.002223461,0.0017822328,0.0013510553,0.023004077,0.6960258,0.00016030368],"about_ca_topic_score_codex":0.006614609,"about_ca_topic_score_gemma":0.012916746,"teacher_disagreement_score":0.006614609,"about_ca_system_score_codex":0.0027153755,"about_ca_system_score_gemma":0.005935206,"threshold_uncertainty_score":0.031138599},"labels":[],"label_agreement":null},{"id":"W4417047210","doi":"10.1016/j.enbuild.2025.116793","title":"Socio-Demographic insights on urban building energy consumption","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Hydro-Québec; Canada Excellence Research Chairs, Government of Canada","keywords":"Energy consumption; Consumption (sociology); Energy (signal processing); Efficient energy use; Urban heat island; Building energy simulation; Urban planning","score_opus":0.005173040698868448,"score_gpt":0.19389159409124068,"score_spread":0.18871855339237223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417047210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9906442,0.00017247818,0.00036551,0.00014181338,0.0000028165755,0.0000151444265,0.003990619,0.000007654077,0.004659761],"genre_scores_gemma":[0.99685436,0.0001392634,0.00022253783,0.00002061811,0.0000027410938,0.000009916566,0.0015501435,0.0000034265931,0.0011970438],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998635,0.000025608131,0.000006807673,0.000021038053,0.00004413272,0.000038926195],"domain_scores_gemma":[0.9995352,0.000074948504,0.00008543347,0.00002698895,0.00019370875,0.000083744606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023961444,0.00015326895,0.00011970879,0.0008847543,0.0005709287,0.00059193315,0.0002118492,0.00013932498,0.003960742],"category_scores_gemma":[0.0007645517,0.00006836,0.00026535676,0.0016235064,0.00033264834,0.00023701956,0.00037506886,0.00017607349,0.0003739154],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039731513,0.000023402505,0.98445684,0.000027667636,0.00004135894,0.00008063926,0.0019008709,0.0012689453,0.00045679457,0.0007343643,0.0011057314,0.009863719],"study_design_scores_gemma":[2.8286124e-7,0.0000035887429,0.99711716,0.00000587325,0.000002931805,0.000011459568,0.001252862,0.0005822861,0.00002380459,0.000043448046,0.0009529677,0.0000033674721],"about_ca_topic_score_codex":0.81709516,"about_ca_topic_score_gemma":0.9197869,"teacher_disagreement_score":0.81709516,"about_ca_system_score_codex":0.0032448529,"about_ca_system_score_gemma":0.0013358429,"threshold_uncertainty_score":0.36796397},"labels":[],"label_agreement":null},{"id":"W4417122330","doi":"10.3390/en18246424","title":"An Equilibrium Analysis of Time-Varying and Flat Electricity Rates","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Dalhousie University","funders":"","keywords":"Tariff; Electricity; Consumption (sociology); Service (business); Value (mathematics); Electricity price; Service provider; Electricity market","score_opus":0.0045470712094060955,"score_gpt":0.22066624954097205,"score_spread":0.21611917833156596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417122330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5502992,0.0005806948,0.3449664,0.00059188175,0.000072621755,0.00025768141,0.0004892182,0.00018579558,0.10255644],"genre_scores_gemma":[0.9782536,0.00026908834,0.0072394037,0.00004475871,0.000013839748,0.00004908924,0.000110939676,0.000029534513,0.01398976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938595,0.00020022065,0.000015569638,0.00007180089,0.00011648734,0.00020982444],"domain_scores_gemma":[0.99896264,0.0005369502,0.00013615955,0.00005692329,0.0002312799,0.00007609975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012048171,0.00054503215,0.0004790209,0.00091078866,0.00049713743,0.0016325099,0.0013246287,0.0008040855,0.00687078],"category_scores_gemma":[0.0045965374,0.0003148111,0.00097408047,0.00058950315,0.00081431854,0.0011900698,0.00065272977,0.0007564905,0.0005408997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014901512,0.00012013243,0.0034425298,0.00007427915,0.00004742649,0.0005838812,0.0003081288,0.60771805,0.0038122595,0.36899143,0.0015934705,0.013159462],"study_design_scores_gemma":[0.00001862471,0.000062518884,0.0016535465,0.000010916155,0.000014776783,0.00006518977,0.00025824446,0.97429186,0.00046960457,0.021723336,0.0014090308,0.000022395097],"about_ca_topic_score_codex":0.057121135,"about_ca_topic_score_gemma":0.023661623,"teacher_disagreement_score":0.057121135,"about_ca_system_score_codex":0.0026542787,"about_ca_system_score_gemma":0.001270375,"threshold_uncertainty_score":0.113577306},"labels":[],"label_agreement":null},{"id":"W4417164449","doi":"10.1080/23744731.2025.2593799","title":"Grey-box models of chiller evaporator for practical integration in building automation systems","year":2025,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; École de Technologie Supérieure","funders":"","keywords":"Chiller; Evaporator; Water chiller; Chiller boiler system; Building automation; Automation; System integration","score_opus":0.013403600343124615,"score_gpt":0.2482954990842272,"score_spread":0.23489189874110258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417164449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035910208,0.00043830066,0.9552105,0.00017853799,0.000062089115,0.000075091455,0.00021598113,0.00042945397,0.007479852],"genre_scores_gemma":[0.95821697,0.00046538038,0.034636986,0.000049508522,0.0000206179,0.00022917498,0.00021379167,0.00006650413,0.006101221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973434,0.00008668463,0.000013185163,0.00005893163,0.00007801926,0.000028730463],"domain_scores_gemma":[0.99944454,0.00035288587,0.000054464712,0.000035203782,0.00009894391,0.00001398476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006274631,0.0007137981,0.0007684914,0.00032529066,0.00031932077,0.0010017543,0.0010026408,0.0011101268,0.0028152918],"category_scores_gemma":[0.0017456099,0.00048871984,0.00083350827,0.0003319691,0.0006275157,0.00086346874,0.0005887474,0.0010795955,0.000435789],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009916185,0.0000042517117,0.00012136484,0.000019924475,0.000006837109,0.00001632648,0.000017764276,0.9947582,0.0007312504,0.0027834512,0.00006517191,0.0014655173],"study_design_scores_gemma":[0.0000013202341,0.000004745485,0.000047271085,0.0000021526894,0.0000019845086,0.0000021102594,0.0000021613394,0.9988003,0.00020280952,0.0007593309,0.000174191,0.0000016167488],"about_ca_topic_score_codex":0.009482918,"about_ca_topic_score_gemma":0.0044699586,"teacher_disagreement_score":0.009482918,"about_ca_system_score_codex":0.0006297097,"about_ca_system_score_gemma":0.000700846,"threshold_uncertainty_score":0.018855453},"labels":[],"label_agreement":null},{"id":"W4417169342","doi":"10.1109/naps66256.2025.11272255","title":"Estimating Probabilistic Load Coincidence Factors for Distribution System Operation","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Coincidence; Probabilistic logic; Complement (music); Set (abstract data type); Gaussian; Statistical model; Probability distribution; Random variable","score_opus":0.012279151616920538,"score_gpt":0.23686688283190857,"score_spread":0.22458773121498804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417169342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1745704,0.00012725883,0.8232168,0.00011005786,0.000013956076,0.000086763954,0.00042533275,0.00028196958,0.0011674276],"genre_scores_gemma":[0.9688862,0.00008665901,0.029962968,0.000015868058,0.000023856674,0.000060865037,0.0006174734,0.00004713281,0.00029891302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978199,0.00078237086,0.000112382775,0.0006044166,0.00050870026,0.00017210978],"domain_scores_gemma":[0.9790197,0.016106851,0.0024821027,0.0014776193,0.0007160287,0.00019766518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004903123,0.00094039977,0.0009614369,0.0011792852,0.00035100366,0.0014017919,0.0010943235,0.0008217773,0.0012614712],"category_scores_gemma":[0.034375645,0.00088614295,0.0008462161,0.0015313997,0.0011417256,0.002379537,0.0010979061,0.0012708294,0.0002458936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102704194,0.000025230218,0.008185775,0.00003389998,0.000042311578,0.00006617776,0.000048519945,0.97339714,0.00058025046,0.008364125,0.0003407628,0.008813059],"study_design_scores_gemma":[0.000004007984,0.000016412749,0.001728665,0.0000039867236,0.0000043276136,0.000026928086,0.000013600951,0.9920894,0.000233194,0.005751771,0.000117834854,0.000009890411],"about_ca_topic_score_codex":0.004748732,"about_ca_topic_score_gemma":0.004056578,"teacher_disagreement_score":0.004903123,"about_ca_system_score_codex":0.0013209066,"about_ca_system_score_gemma":0.0008957014,"threshold_uncertainty_score":0.025930524},"labels":[],"label_agreement":null},{"id":"W4417336903","doi":"10.1109/access.2025.3644794","title":"Balancing Efficiency and Longevity in Community Energy Storage Systems Using Predictive Scheduling","year":2025,"lang":"","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Maximization; Scheduling (production processes); Energy storage; Capacity optimization; Electric power system; Peaking power plant; Efficient energy use","score_opus":0.02037745862821451,"score_gpt":0.2720790881424049,"score_spread":0.2517016295141904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417336903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78309524,0.0005817862,0.21083844,0.00036638038,0.00003633543,0.00008531538,0.00027489525,0.00042613005,0.004295427],"genre_scores_gemma":[0.9963554,0.000043005657,0.0033260435,0.000008245911,0.0000042005245,0.000010528824,0.000050045302,0.0000067090273,0.00019587719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998148,0.000053093572,0.000009747515,0.000041521762,0.000044175667,0.000036614532],"domain_scores_gemma":[0.9995716,0.00021057412,0.000062325955,0.00004073105,0.00008342481,0.000031300242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071420835,0.0004632328,0.00045202533,0.00032280004,0.00036082044,0.0007298166,0.000692578,0.0003331549,0.0006514228],"category_scores_gemma":[0.0017361911,0.00016593875,0.000236275,0.0004857474,0.000248679,0.0010250825,0.00048474324,0.00034918817,0.00007935485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085272935,0.000052562445,0.00278417,0.00003470725,0.000022377268,0.000044137963,0.000025847148,0.9678776,0.0015983547,0.0011104599,0.0004116581,0.02595294],"study_design_scores_gemma":[0.0000041036524,0.000022897373,0.0005652123,0.000002061322,0.0000048913107,0.000008288356,0.000017384851,0.9978109,0.0004814569,0.0009488675,0.00013083681,0.000003133497],"about_ca_topic_score_codex":0.0083839735,"about_ca_topic_score_gemma":0.012887559,"teacher_disagreement_score":0.0083839735,"about_ca_system_score_codex":0.00075177115,"about_ca_system_score_gemma":0.00071647373,"threshold_uncertainty_score":0.016670346},"labels":[],"label_agreement":null},{"id":"W4417525376","doi":"10.1007/978-981-95-1826-5_52","title":"Unlocking the Potential of Solar Renewable Energy Communities in an Urban District in Bari, Italy","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Medical Association","funders":"","keywords":"Renewable energy; Occupancy; Incentive; Photovoltaic system; Revenue; Matching (statistics); Incentive program; Electricity; Feed-in tariff","score_opus":0.00623272153066279,"score_gpt":0.17403689951589107,"score_spread":0.1678041779852283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417525376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90445125,0.0010225758,0.00075945444,0.00421792,0.00009147853,0.0000525758,0.00023173826,0.000059809532,0.08911321],"genre_scores_gemma":[0.98463005,0.00026188698,0.0003937528,0.0001126811,0.000029772871,0.00001531746,0.00010389325,0.000008949093,0.014443574],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997439,0.00009112775,0.0000035415912,0.000022338761,0.00003380649,0.000105192536],"domain_scores_gemma":[0.9998703,0.000016790207,0.000012362011,0.000005029444,0.000015293459,0.00008023898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021735017,0.00013248972,0.00012353125,0.0004560976,0.002033665,0.0014532572,0.00069832784,0.00059532333,0.004579834],"category_scores_gemma":[0.00030728336,0.00014266238,0.00013178286,0.0008055465,0.00105886,0.00065460394,0.0018642029,0.0005049637,0.00039875915],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084098836,0.0013490989,0.19966966,0.0012162048,0.00013419162,0.018645411,0.06841876,0.015917622,0.012812989,0.1626582,0.12801063,0.39032635],"study_design_scores_gemma":[0.00009142536,0.00039922295,0.56463116,0.00032745863,0.000072058494,0.0014447243,0.12963258,0.0073770476,0.00080660946,0.0098514175,0.2852972,0.00006917959],"about_ca_topic_score_codex":0.052717734,"about_ca_topic_score_gemma":0.29163226,"teacher_disagreement_score":0.052717734,"about_ca_system_score_codex":0.0032443255,"about_ca_system_score_gemma":0.0024920069,"threshold_uncertainty_score":0.1048218},"labels":[],"label_agreement":null},{"id":"W581861897","doi":"","title":"Demand Response: An analysis of potential and opportunities in Energy Pool’s targeted markets","year":2013,"lang":"en","type":"dissertation","venue":"Utrecht University Repository (Utrecht University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Natural resource economics; Economics; Business; Engineering; Electricity; Electrical engineering","score_opus":0.006433777693228041,"score_gpt":0.16248102284489632,"score_spread":0.1560472451516683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W581861897","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6871872,0.00061980874,0.017234335,0.0015610369,0.000016176147,0.0003356633,0.00092746725,0.00006240605,0.29205596],"genre_scores_gemma":[0.9888837,0.00017902952,0.0013629163,0.000047417336,0.0000065330137,0.00004894768,0.0001545431,0.000013844775,0.009303141],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99928707,0.00018213308,0.000014648591,0.00007334914,0.00020767306,0.00023524946],"domain_scores_gemma":[0.998803,0.0004992609,0.00013471556,0.000047558442,0.0003369989,0.00017859206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011390488,0.00024615633,0.0004155199,0.0010219081,0.0008444162,0.0032801868,0.0010974187,0.0008051589,0.013777212],"category_scores_gemma":[0.003197905,0.00030116056,0.0009770097,0.0014138785,0.00081880385,0.0030840775,0.001115647,0.0005657381,0.0007102252],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012652944,0.0004808616,0.058303043,0.0005157399,0.00015878424,0.0023976176,0.0020435338,0.12699841,0.0070265383,0.7431296,0.0099438485,0.04773677],"study_design_scores_gemma":[0.0002271937,0.00093363033,0.1036053,0.00021700714,0.00019399077,0.0010062036,0.013164817,0.64129037,0.0033325173,0.17173913,0.06412498,0.00016493547],"about_ca_topic_score_codex":0.028344357,"about_ca_topic_score_gemma":0.03324413,"teacher_disagreement_score":0.028344357,"about_ca_system_score_codex":0.004390933,"about_ca_system_score_gemma":0.002129372,"threshold_uncertainty_score":0.056358755},"labels":[],"label_agreement":null},{"id":"W6888852600","doi":"10.25316/ir-12641","title":"The Nanaimo Free Press [Tuesday, December 18, 1888]","year":2019,"lang":"en","type":"other","venue":"VIUSpace (Vancouver Island University Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Free press; Free enterprise; Gloom","score_opus":0.005713499435194328,"score_gpt":0.1618144042314531,"score_spread":0.15610090479625877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6888852600","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069392985,0.009002324,0.00011133032,0.00283903,0.0029880325,0.00002462636,0.0022464148,0.000115201336,0.98197913],"genre_scores_gemma":[0.0010552618,0.0010903691,0.00003709843,0.00014851504,0.000073542025,0.000008610352,0.00020287042,0.00004574025,0.997338],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99971217,0.000020187486,0.0000112970365,0.000049056645,0.00014055897,0.0000667437],"domain_scores_gemma":[0.99981993,0.000024149187,0.000010048453,0.000014046857,0.000094139774,0.000037685313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002565007,0.000894297,0.0004828739,0.0017153036,0.004714573,0.005705772,0.0006214615,0.0016856582,0.24764495],"category_scores_gemma":[0.0011572901,0.00048679105,0.00027857968,0.0029586412,0.00073979393,0.0019139632,0.0012876918,0.002818498,0.089077584],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021335127,0.000008104196,0.00018254392,0.00007692297,0.0000029989935,0.000091299,0.00018366342,0.000051898354,0.000082151586,0.013071818,0.9554851,0.030742181],"study_design_scores_gemma":[0.0000012389179,0.0000013678149,0.00032685813,0.000042062435,6.103476e-7,0.000014097,0.000050260063,0.000008414348,0.000027532784,0.00027589995,0.9992493,0.0000022906065],"about_ca_topic_score_codex":0.213363,"about_ca_topic_score_gemma":0.62067175,"teacher_disagreement_score":0.786637,"about_ca_system_score_codex":0.0050777434,"about_ca_system_score_gemma":0.003432087,"threshold_uncertainty_score":0.82845485},"labels":[],"label_agreement":null},{"id":"W6889878898","doi":"10.3389/fmicb.2022.970358.s008","title":"Table_10_Evaluating the effects of antimicrobial drug use on the ecology of antimicrobial resistance and microbial community structure in beef feedlot cattle.csv","year":2022,"lang":"en","type":"dataset","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Resistome; UniFrac; Metagenomics; Microbiome; Context (archaeology); Antibiotic resistance; Antimicrobial; Microbial ecology; Salmonella enterica","score_opus":0.0161479222212711,"score_gpt":0.2180309096942055,"score_spread":0.2018829874729344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6889878898","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034313567,0.00057268766,0.0011425012,0.00068189506,0.00043694794,0.0005267058,0.9164079,0.0010414488,0.044876415],"genre_scores_gemma":[0.15258859,0.0015720241,0.012011372,0.0012274039,0.00029149855,0.0011961005,0.7208913,0.00064093544,0.10958084],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996488,0.000060585393,0.000022828815,0.000073046074,0.00014903459,0.000045615434],"domain_scores_gemma":[0.99834514,0.0006738844,0.00015301134,0.00007200072,0.0005940219,0.00016193428],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00058969815,0.00036963492,0.00034213116,0.0015075082,0.00055688556,0.0008085092,0.0007021219,0.000361659,0.31679842],"category_scores_gemma":[0.002032893,0.00013508934,0.0005191928,0.0021396128,0.00014630581,0.00049717556,0.00056550873,0.00029292091,0.019666942],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017612259,0.00042622566,0.0750034,0.0033878419,0.00023290512,0.00018742084,0.00025349154,0.0012868078,0.0106432615,0.0013958033,0.7189892,0.18643245],"study_design_scores_gemma":[0.00046287675,0.0019473691,0.4752551,0.0013638076,0.00017008126,0.0002852714,0.0013767934,0.00230141,0.008878766,0.0019864955,0.5058716,0.00010038126],"about_ca_topic_score_codex":0.01929212,"about_ca_topic_score_gemma":0.03825068,"teacher_disagreement_score":0.31679842,"about_ca_system_score_codex":0.0006981146,"about_ca_system_score_gemma":0.0009735173,"threshold_uncertainty_score":0.9745041},"labels":[],"label_agreement":null},{"id":"W6890037794","doi":"10.3389/fsufs.2025.1443215.s001","title":"Data Sheet 1_Exploring the influence of natural features on soil mesofaunal communities in agricultural landscapes through DNA metabarcoding.xlsx","year":2025,"lang":"en","type":"dataset","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soil mesofauna; Biodiversity; Species richness; Habitat; Soil biology; Ecosystem; Vegetation (pathology); Ecosystem services","score_opus":0.03819569323705352,"score_gpt":0.25241609652442754,"score_spread":0.21422040328737402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6890037794","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020548886,0.000015966025,0.0006580321,0.00006458974,0.000021554351,0.00014579225,0.9961283,0.0011541259,0.0016062371],"genre_scores_gemma":[0.0010185455,0.00007523528,0.005355151,0.0002155382,0.000023130875,0.00201426,0.98576003,0.0011619038,0.0043762065],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963781,0.0004186535,0.0008512802,0.0008601594,0.0009867355,0.0005051057],"domain_scores_gemma":[0.9843933,0.007962513,0.0018768954,0.0018677318,0.0031566634,0.0007429013],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.006587322,0.0025954256,0.002817433,0.009220729,0.002140464,0.0032545296,0.0042213267,0.002396976,0.56943214],"category_scores_gemma":[0.021215213,0.0022181557,0.0012710589,0.010952545,0.0010651889,0.003072205,0.0028510792,0.0017011751,0.18868537],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026266303,0.000079400656,0.0034786346,0.004520593,0.000079819365,0.00012957654,0.00034739025,0.0003680202,0.0016514251,0.0016970279,0.9771275,0.010257961],"study_design_scores_gemma":[0.0010981663,0.00010300995,0.015723007,0.0015113056,0.00008324762,0.0001212753,0.00037079357,0.00073450746,0.0018350661,0.0030413165,0.97526306,0.000115199226],"about_ca_topic_score_codex":0.027609015,"about_ca_topic_score_gemma":0.05671785,"teacher_disagreement_score":0.56943214,"about_ca_system_score_codex":0.0022567895,"about_ca_system_score_gemma":0.006408589,"threshold_uncertainty_score":0.6141528},"labels":[],"label_agreement":null},{"id":"W6891659105","doi":"10.48336/5nqt-7182","title":"Design and implementation of peer-to-peer energy trading system using internet of things and blockchain","year":2024,"lang":"en","type":"article","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Microgrid; Blockchain; Renewable energy; Energy (signal processing); The Internet; Distributed generation; Smart contract; Order (exchange)","score_opus":0.025511423586887634,"score_gpt":0.24750511626540034,"score_spread":0.2219936926785127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6891659105","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.124760196,0.0005947905,0.82701284,0.0007161899,0.00029978066,0.0013807476,0.00020615316,0.005613289,0.039416023],"genre_scores_gemma":[0.91266185,0.00019105805,0.078053676,0.00011962802,0.000028945426,0.000447409,0.00015307734,0.000044753422,0.008299683],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992526,0.00013178539,0.0000727412,0.00014734146,0.00029558374,0.00009991276],"domain_scores_gemma":[0.9995908,0.000059673253,0.000045405894,0.00006871888,0.00016768785,0.00006771351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005038893,0.00037504136,0.00049057463,0.00034149716,0.0008547723,0.0010647284,0.0016151898,0.0007888163,0.004866332],"category_scores_gemma":[0.0006112334,0.00023139083,0.0003086563,0.000304089,0.00042757866,0.0011479749,0.00080476777,0.00046817967,0.00084600894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001475691,0.0012065576,0.011061135,0.0012496633,0.00024949864,0.003851689,0.0009336839,0.29299545,0.17449008,0.065284975,0.014489873,0.43271175],"study_design_scores_gemma":[0.0002947709,0.00083279767,0.0014635387,0.000047180347,0.00009764301,0.0007202316,0.00017703408,0.9002026,0.054468166,0.008940552,0.03266955,0.000085992986],"about_ca_topic_score_codex":0.0017849453,"about_ca_topic_score_gemma":0.0016007654,"teacher_disagreement_score":0.004866332,"about_ca_system_score_codex":0.00045433996,"about_ca_system_score_gemma":0.0011166135,"threshold_uncertainty_score":0.016279519},"labels":[],"label_agreement":null},{"id":"W6893232032","doi":"10.5281/zenodo.14980890","title":"Fig. 15 in A revision of the genus Sclerocoelus Marshall (Diptera: Sphaeroceridae)","year":2025,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Paratype; Holotype; Genus; Dorsum; Scale (ratio)","score_opus":0.015872139443455956,"score_gpt":0.2076915588379293,"score_spread":0.19181941939447336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6893232032","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046519358,0.04503529,0.04034148,0.0071043037,0.032042965,0.0014953997,0.03175837,0.006990654,0.78871214],"genre_scores_gemma":[0.2318573,0.03541574,0.073418476,0.0042352118,0.0070138155,0.0013886559,0.04426962,0.0024623366,0.5999389],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997694,0.000046249384,0.00002712904,0.000056303397,0.000069914655,0.000030920026],"domain_scores_gemma":[0.9997813,0.000033728826,0.000030635798,0.00003856599,0.000080967904,0.000034859815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037527594,0.00089458714,0.00030295202,0.0027978814,0.0009810976,0.00071846956,0.00079979503,0.00070717814,0.046311818],"category_scores_gemma":[0.0008759605,0.00020542309,0.00034815242,0.0013460135,0.0010707368,0.0011080861,0.0008776468,0.0010396859,0.020198593],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016297518,0.000040724062,0.0034452805,0.0010236998,0.000039273124,0.00042251003,0.00084295706,0.00027663313,0.006087142,0.010363518,0.3762861,0.60100925],"study_design_scores_gemma":[0.000008309516,0.000030136704,0.007202107,0.00019374644,0.00002252387,0.00048286462,0.00015333257,0.000097245924,0.00043658708,0.0006328519,0.99072826,0.000012027196],"about_ca_topic_score_codex":0.007145657,"about_ca_topic_score_gemma":0.014562002,"teacher_disagreement_score":0.046311818,"about_ca_system_score_codex":0.0006479658,"about_ca_system_score_gemma":0.0007982521,"threshold_uncertainty_score":0.1549285},"labels":[],"label_agreement":null},{"id":"W6894396698","doi":"10.5683/sp3/jvm89b","title":"Supplementary Data for \"Myocytic androgen receptor overexpression does not affect sex differences in adaptation to chronic endurance exercise\"","year":2022,"lang":"en","type":"dataset","venue":"Borealis","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Affect (linguistics); Androgen receptor; Adaptation (eye); Androgen; Receptor","score_opus":0.028325659402657435,"score_gpt":0.2567290174238784,"score_spread":0.22840335802122094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6894396698","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006090779,0.000027307666,0.00004104303,0.000032697615,0.000022168837,0.000007301345,0.99934477,0.00013047067,0.00033328042],"genre_scores_gemma":[0.00039715105,0.000032103573,0.00023637818,0.00007494226,0.000006874862,0.00008609144,0.99841547,0.00006460261,0.00068634184],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990596,0.00013397506,0.00011403285,0.0002897664,0.00024279192,0.00015989333],"domain_scores_gemma":[0.9962792,0.0015292676,0.00032443347,0.0006751175,0.00086955813,0.00032234035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011678671,0.0020503972,0.001873284,0.001997397,0.0010794104,0.0027178624,0.0028241582,0.0026735603,0.24504346],"category_scores_gemma":[0.0071195136,0.0008211429,0.0017424381,0.003737607,0.000512884,0.0012316608,0.0017213853,0.0019092135,0.15673892],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011191379,0.000040767958,0.0009566133,0.0011618957,0.00005568404,0.000027020524,0.00001953594,0.00044000978,0.00024706498,0.00035050572,0.994769,0.0018199614],"study_design_scores_gemma":[0.00092678383,0.00006913569,0.0119343605,0.0006908415,0.00013899,0.0001574903,0.00011217775,0.0010010917,0.0007970134,0.0030009719,0.9810968,0.00007441472],"about_ca_topic_score_codex":0.028583718,"about_ca_topic_score_gemma":0.06555878,"teacher_disagreement_score":0.24504346,"about_ca_system_score_codex":0.001618922,"about_ca_system_score_gemma":0.0028548383,"threshold_uncertainty_score":0.81975204},"labels":[],"label_agreement":null},{"id":"W6901604272","doi":"10.60692/1r03f-f2157","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Load management; Scheduling (production processes); Energy management; Efficient energy use; Demand side; Grid; Load balancing (electrical power)","score_opus":0.01454191592027209,"score_gpt":0.1767379192982555,"score_spread":0.1621960033779834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901604272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04113746,0.0025333953,0.9311141,0.00047450748,0.0001453706,0.00009799059,0.00013069368,0.00035107578,0.024015417],"genre_scores_gemma":[0.9467477,0.0019862675,0.04478081,0.000058318856,0.00009276922,0.000060476494,0.000114995164,0.00006641119,0.0060922606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997584,0.00007306732,0.000012740888,0.000050770726,0.000063522624,0.00004152188],"domain_scores_gemma":[0.99987173,0.00004143817,0.000023590115,0.0000107043625,0.000042542386,0.0000100068855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002823055,0.00055563776,0.00063128193,0.00029987496,0.0002592534,0.001137131,0.0005104401,0.00037059412,0.0024022495],"category_scores_gemma":[0.0004959551,0.0002452621,0.00029479858,0.0005583519,0.00020679597,0.0007824178,0.00034668515,0.00036156454,0.00035957276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009795892,0.0000763236,0.000893981,0.00028301435,0.00005523843,0.00007717182,0.0000625598,0.85370773,0.006589169,0.027911598,0.003557157,0.1066881],"study_design_scores_gemma":[0.0000079642705,0.000039891253,0.00038157453,0.000012809707,0.0000136896615,0.00002147314,0.000030880332,0.9887439,0.0011701379,0.0066115796,0.0029604973,0.000005631626],"about_ca_topic_score_codex":0.002399553,"about_ca_topic_score_gemma":0.003449861,"teacher_disagreement_score":0.0024022495,"about_ca_system_score_codex":0.0006383318,"about_ca_system_score_gemma":0.0009021784,"threshold_uncertainty_score":0.008036315},"labels":[],"label_agreement":null},{"id":"W6901674607","doi":"10.60692/vvaga-pvj81","title":"Reviewing the scope and thematic focus of 100 000 publications on energy consumption, services and social aspects of climate change: a big data approach to demand-side mitigation *","year":2021,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Typology; Climate change; Underpinning; Centrality; Scope (computer science); Big data; Action (physics); Thematic analysis; Politics","score_opus":0.08806154543724386,"score_gpt":0.2303908312390615,"score_spread":0.14232928580181764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901674607","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085522376,0.70869285,0.011778772,0.042721476,0.0062172385,0.0010300592,0.094836265,0.0007341639,0.048466798],"genre_scores_gemma":[0.25544202,0.6230483,0.028541485,0.01158382,0.0052523394,0.0019048182,0.06244476,0.00085454446,0.010927842],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9866247,0.0027766593,0.0035123432,0.0017274936,0.0047230357,0.0006357464],"domain_scores_gemma":[0.8448155,0.118677765,0.013034974,0.0040808795,0.01730865,0.0020822927],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.013343209,0.0010682178,0.0017034741,0.073430404,0.0019606731,0.007986858,0.0014234458,0.0017816136,0.008546948],"category_scores_gemma":[0.07744261,0.000652824,0.0018624256,0.10073455,0.0017398596,0.006857975,0.004263349,0.0012438827,0.0032703576],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039211343,0.000095297284,0.03344071,0.23850432,0.0014357796,0.0026245746,0.018797291,0.0016818148,0.0073730405,0.020307407,0.18139714,0.49395055],"study_design_scores_gemma":[0.000041505635,0.000092021684,0.041917197,0.16632244,0.0020553228,0.0010379981,0.017492525,0.0009876045,0.0032084573,0.009616426,0.757108,0.00012047049],"about_ca_topic_score_codex":0.0025913478,"about_ca_topic_score_gemma":0.00589804,"teacher_disagreement_score":0.9866568,"about_ca_system_score_codex":0.002738757,"about_ca_system_score_gemma":0.011752512,"threshold_uncertainty_score":0.070566535},"labels":[],"label_agreement":null},{"id":"W6901705303","doi":"10.60692/x23z3-fr886","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Load management; Scheduling (production processes); Energy management; Efficient energy use; Demand side; Grid; Load balancing (electrical power)","score_opus":0.01454191592027209,"score_gpt":0.1767379192982555,"score_spread":0.1621960033779834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901705303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04113746,0.0025333953,0.9311141,0.00047450748,0.0001453706,0.00009799059,0.00013069368,0.00035107578,0.024015417],"genre_scores_gemma":[0.9467477,0.0019862675,0.04478081,0.000058318856,0.00009276922,0.000060476494,0.000114995164,0.00006641119,0.0060922606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997584,0.00007306732,0.000012740888,0.000050770726,0.000063522624,0.00004152188],"domain_scores_gemma":[0.99987173,0.00004143817,0.000023590115,0.0000107043625,0.000042542386,0.0000100068855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002823055,0.00055563776,0.00063128193,0.00029987496,0.0002592534,0.001137131,0.0005104401,0.00037059412,0.0024022495],"category_scores_gemma":[0.0004959551,0.0002452621,0.00029479858,0.0005583519,0.00020679597,0.0007824178,0.00034668515,0.00036156454,0.00035957276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009795892,0.0000763236,0.000893981,0.00028301435,0.00005523843,0.00007717182,0.0000625598,0.85370773,0.006589169,0.027911598,0.003557157,0.1066881],"study_design_scores_gemma":[0.0000079642705,0.000039891253,0.00038157453,0.000012809707,0.0000136896615,0.00002147314,0.000030880332,0.9887439,0.0011701379,0.0066115796,0.0029604973,0.000005631626],"about_ca_topic_score_codex":0.002399553,"about_ca_topic_score_gemma":0.003449861,"teacher_disagreement_score":0.0024022495,"about_ca_system_score_codex":0.0006383318,"about_ca_system_score_gemma":0.0009021784,"threshold_uncertainty_score":0.008036315},"labels":[],"label_agreement":null},{"id":"W6920869463","doi":"10.6084/m9.figshare.17012.v1","title":"Women and HIV-5","year":2011,"lang":"en","type":"other","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Health care; Public health; Human immunodeficiency virus (HIV); Population; MEDLINE","score_opus":0.01900911034866176,"score_gpt":0.17234332204126132,"score_spread":0.15333421169259956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6920869463","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08095265,0.13227259,0.0002514817,0.06453419,0.0022432914,0.00017781979,0.06944975,0.00023310794,0.6498851],"genre_scores_gemma":[0.6808361,0.1181515,0.0005921145,0.02085746,0.0010934665,0.00022245012,0.02042996,0.00007955074,0.15773736],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947697,0.00005842052,0.00002127469,0.000031868032,0.00016156795,0.0002499251],"domain_scores_gemma":[0.999529,0.000061873994,0.000075490214,0.000022065175,0.00012915807,0.00018234453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003575195,0.00014534761,0.00019834905,0.0009461661,0.0015046061,0.0014203415,0.0003589246,0.0006328998,0.044091064],"category_scores_gemma":[0.0022067733,0.00009979852,0.0002627787,0.0021460443,0.00034738256,0.00049207726,0.0006849373,0.0007236628,0.0026728015],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002260318,0.0000882072,0.14971565,0.00069199415,0.00005981115,0.0003697309,0.0021186704,0.000079060424,0.00012101385,0.011755954,0.6113211,0.22345275],"study_design_scores_gemma":[0.000031324562,0.00005477196,0.3504552,0.0030202612,0.00008625078,0.0006663834,0.004039061,0.00007123107,0.00011281936,0.002269145,0.63916564,0.00002791735],"about_ca_topic_score_codex":0.5317759,"about_ca_topic_score_gemma":0.6467324,"teacher_disagreement_score":0.5317759,"about_ca_system_score_codex":0.0021011073,"about_ca_system_score_gemma":0.004434799,"threshold_uncertainty_score":0.94196314},"labels":[],"label_agreement":null},{"id":"W6943611036","doi":"10.1582/leuros.2010.06.03002","title":"Demand-responsive lighting: a field study","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Resources Canada; National Research Council Canada; Public Works and Government Services Canada; Electric Power Research Institute","keywords":"Electricity; Electric field; Electric shock; Field (mathematics); Stress (linguistics)","score_opus":0.005406230793626936,"score_gpt":0.20881990591301233,"score_spread":0.2034136751193854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6943611036","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987226,0.000020215719,0.00046714905,0.000025047453,0.000008686966,0.00017003313,0.000034655495,0.000006901753,0.00054471375],"genre_scores_gemma":[0.9951238,0.000075001764,0.002188815,0.00017414169,0.00003577593,0.00034023702,0.00011611627,0.000007952539,0.0019381888],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9990213,0.0003503862,0.00005241567,0.0002764456,0.0001479145,0.00015154398],"domain_scores_gemma":[0.99617994,0.0016049492,0.00040867075,0.00047879232,0.00067974516,0.000647932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021095653,0.00069838844,0.0005696285,0.0004342245,0.0015511467,0.000599166,0.0008254801,0.00113609,0.0031034965],"category_scores_gemma":[0.0031641074,0.00045404772,0.0004598055,0.00020246912,0.00089978415,0.0006149984,0.00062303373,0.0010563054,0.0007494547],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.026394064,0.18906875,0.19550736,0.0017774913,0.00016365237,0.005050349,0.0710987,0.0019410407,0.39453018,0.0014102288,0.0028996514,0.11015851],"study_design_scores_gemma":[0.003456277,0.4260026,0.4135455,0.00025726986,0.00034766443,0.005014541,0.06120129,0.0035864217,0.06768521,0.0022706087,0.016251182,0.00038151472],"about_ca_topic_score_codex":0.0013098839,"about_ca_topic_score_gemma":0.0020458107,"teacher_disagreement_score":0.0031034965,"about_ca_system_score_codex":0.0003578743,"about_ca_system_score_gemma":0.00056947756,"threshold_uncertainty_score":0.011156619},"labels":[],"label_agreement":null},{"id":"W6943627593","doi":"10.17605/osf.io/sjvz4","title":"Energy demand and carbon emissions reduction potential of dynamic pricing of electricity: a systematic review and meta-analysis of experimental evidence","year":2022,"lang":"en","type":"other","venue":"OSF Preprints (OSF Preprints)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Incentive; Energy demand; Energy consumption; Dynamic pricing; Consumption (sociology); Efficient energy use; Energy (signal processing); Peak demand; Energy conservation","score_opus":0.013435202630141408,"score_gpt":0.24509871389122487,"score_spread":0.23166351126108345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6943627593","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027675673,0.99419254,0.00092298305,0.00035792237,0.00020426737,0.00059144385,0.0005142863,0.000027261478,0.00042177225],"genre_scores_gemma":[0.122728705,0.868461,0.003647389,0.0016083521,0.00026178843,0.0020673287,0.00080675626,0.000048718095,0.00036992872],"study_design_codex":"systematic_review","study_design_gemma":"meta_analysis","domain_scores_codex":[0.98489386,0.00788273,0.0041121957,0.0013502375,0.0014578769,0.00030311526],"domain_scores_gemma":[0.9491271,0.04186941,0.0052093766,0.0013466586,0.0021931187,0.00025435345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020000998,0.0023037263,0.011905949,0.004532806,0.0005224307,0.0040677725,0.0018892022,0.0023355414,0.0044904263],"category_scores_gemma":[0.07489123,0.0011545143,0.02441005,0.004879533,0.0011838012,0.0022540747,0.0016481463,0.0020197635,0.00041605678],"study_design_candidate":"meta_analysis","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017551365,0.00004869575,0.0011097221,0.7525959,0.21875006,0.000072653325,0.0001264735,0.0003537347,0.00025466713,0.0003898531,0.00070412277,0.023838887],"study_design_scores_gemma":[0.001145688,0.00050377304,0.0024213851,0.14677833,0.8418946,0.00011502823,0.00011324759,0.00018236482,0.00031254246,0.000992676,0.0054999636,0.00004044064],"about_ca_topic_score_codex":0.0054247407,"about_ca_topic_score_gemma":0.010296345,"teacher_disagreement_score":0.020000998,"about_ca_system_score_codex":0.0031267488,"about_ca_system_score_gemma":0.0055587008,"threshold_uncertainty_score":0.10577661},"labels":[],"label_agreement":null},{"id":"W6957879477","doi":"10.60692/tfadh-xjp28","title":"Reviewing the scope and thematic focus of 100 000 publications on energy consumption, services and social aspects of climate change: a big data approach to demand-side mitigation *","year":2021,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Typology; Climate change; Underpinning; Centrality; Scope (computer science); Big data; Action (physics); Thematic analysis; Politics","score_opus":0.08806154543724386,"score_gpt":0.2303908312390615,"score_spread":0.14232928580181764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6957879477","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085522376,0.70869285,0.011778772,0.042721476,0.0062172385,0.0010300592,0.094836265,0.0007341639,0.048466798],"genre_scores_gemma":[0.25544202,0.6230483,0.028541485,0.01158382,0.0052523394,0.0019048182,0.06244476,0.00085454446,0.010927842],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9866247,0.0027766593,0.0035123432,0.0017274936,0.0047230357,0.0006357464],"domain_scores_gemma":[0.8448155,0.118677765,0.013034974,0.0040808795,0.01730865,0.0020822927],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.013343209,0.0010682178,0.0017034741,0.073430404,0.0019606731,0.007986858,0.0014234458,0.0017816136,0.008546948],"category_scores_gemma":[0.07744261,0.000652824,0.0018624256,0.10073455,0.0017398596,0.006857975,0.004263349,0.0012438827,0.0032703576],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039211343,0.000095297284,0.03344071,0.23850432,0.0014357796,0.0026245746,0.018797291,0.0016818148,0.0073730405,0.020307407,0.18139714,0.49395055],"study_design_scores_gemma":[0.000041505635,0.000092021684,0.041917197,0.16632244,0.0020553228,0.0010379981,0.017492525,0.0009876045,0.0032084573,0.009616426,0.757108,0.00012047049],"about_ca_topic_score_codex":0.0025913478,"about_ca_topic_score_gemma":0.00589804,"teacher_disagreement_score":0.9265696,"about_ca_system_score_codex":0.002738757,"about_ca_system_score_gemma":0.011752512,"threshold_uncertainty_score":0.070566535},"labels":[],"label_agreement":null},{"id":"W6958117054","doi":"10.60692/ccs9d-syx60","title":"Prediction of Electric Power Demand of HVACs for Operating Rooms in Case of Dynamic Set Points of Temperature: A Case Study","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Artificial neural network; Electric power; Set (abstract data type); Power consumption; Power (physics); Demand response; Electric power system; Recurrent neural network","score_opus":0.015236611579363133,"score_gpt":0.20181450466841117,"score_spread":0.18657789308904804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958117054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9907424,0.0001089911,0.0064916518,0.00023998666,0.000030159215,0.00003334248,0.000809616,0.00011918263,0.0014247135],"genre_scores_gemma":[0.99685174,0.000056610912,0.0020779679,0.000010355276,0.000009974719,0.0000133458425,0.0004642699,0.000006483319,0.00050929276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997447,0.000049512375,0.000022925959,0.000078908204,0.000060606464,0.000043264277],"domain_scores_gemma":[0.9989016,0.00068808766,0.00010014376,0.000073440584,0.00017073526,0.00006593884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050829165,0.00068058516,0.0004460268,0.00073173415,0.00029755195,0.00061033433,0.00087885145,0.0011363643,0.0013569529],"category_scores_gemma":[0.0015224353,0.00031743132,0.00068692456,0.00078506273,0.00030392926,0.0006627379,0.0003310428,0.0007542795,0.00024449447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003761528,0.0004580875,0.08286399,0.00016977121,0.000109968845,0.004146442,0.0001907839,0.88346034,0.0037116094,0.0006921758,0.002549037,0.021271644],"study_design_scores_gemma":[0.000015214835,0.00007775132,0.01815031,0.0000069328144,0.0000140841485,0.00015763941,0.00014374986,0.97925377,0.001517259,0.0003261555,0.00031976355,0.00001749771],"about_ca_topic_score_codex":0.016456703,"about_ca_topic_score_gemma":0.01875174,"teacher_disagreement_score":0.016456703,"about_ca_system_score_codex":0.00086144474,"about_ca_system_score_gemma":0.00039004572,"threshold_uncertainty_score":0.032721817},"labels":[],"label_agreement":null},{"id":"W6958135421","doi":"10.60692/2a9gm-2nb72","title":"Novel Predictive Home Appliance's Management Algorithm in Smart Grids","year":2020,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Scheduling (production processes); Energy consumption; Grid; Electricity; Electric power system; Key (lock); Energy management","score_opus":0.01692664865274803,"score_gpt":0.16634359805735677,"score_spread":0.14941694940460873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958135421","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048089005,0.0004007987,0.94572943,0.00024582152,0.00006368318,0.00007471687,0.000056048313,0.0012538541,0.00408662],"genre_scores_gemma":[0.86470723,0.00023888469,0.13122317,0.00013120883,0.000051034844,0.000106144944,0.00012913793,0.000052757656,0.0033604058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998392,0.00003226155,0.0000086942555,0.000042188534,0.00004361513,0.00003402368],"domain_scores_gemma":[0.999813,0.00009175603,0.000030475183,0.000013060894,0.000038841685,0.0000128422025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041456404,0.00040611057,0.00080019527,0.00032099005,0.00040232105,0.00065392745,0.00093585294,0.0005304142,0.0016046056],"category_scores_gemma":[0.0006368707,0.00021369453,0.00024039771,0.00046162916,0.00034472777,0.0006167376,0.00037848687,0.0005843722,0.00019941363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020977632,0.000110070454,0.0008744075,0.00005879405,0.000027020862,0.000086602675,0.000080453654,0.8565065,0.0027795464,0.009436786,0.0023396073,0.1274904],"study_design_scores_gemma":[0.0000108507,0.0000141650235,0.000046918383,0.0000013252926,0.0000021722972,0.000007757625,0.0000039690794,0.998684,0.00026201984,0.0007207076,0.00024466345,0.0000014475837],"about_ca_topic_score_codex":0.0061866743,"about_ca_topic_score_gemma":0.0050289,"teacher_disagreement_score":0.0061866743,"about_ca_system_score_codex":0.00060879503,"about_ca_system_score_gemma":0.00094958383,"threshold_uncertainty_score":0.012301326},"labels":[],"label_agreement":null},{"id":"W6958158207","doi":"10.6084/m9.figshare.26720043","title":"Additional file 2 of Developing a survey to measure nursing students’ knowledge, attitudes and beliefs, influences, and willingness to be involved in Medical Assistance in Dying (MAiD): a mixed method modified e-Delphi study","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Selkirk College","funders":"","keywords":"Measure (data warehouse); Data collection; MEDLINE; Interview","score_opus":0.06793382780371895,"score_gpt":0.3347030280802281,"score_spread":0.2667692002765092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958158207","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039478396,0.000027308422,0.0013879021,0.0005212377,0.00010575204,0.004303645,0.9818559,0.00033691924,0.0075133494],"genre_scores_gemma":[0.058391664,0.00030533553,0.022471188,0.0022752779,0.00017740636,0.1414814,0.72399205,0.00070336054,0.05020224],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.9991161,0.00030372659,0.00019374999,0.00009444854,0.00017239647,0.00011959677],"domain_scores_gemma":[0.9731505,0.01958173,0.0012430288,0.0009283988,0.0044608447,0.0006354449],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.003156025,0.00061167567,0.00068818656,0.0019837127,0.0011964787,0.0009049131,0.0010138917,0.0009172929,0.76054186],"category_scores_gemma":[0.03410982,0.00051423436,0.0005273203,0.0022816185,0.000216687,0.0011429753,0.00086139835,0.0008700412,0.08638565],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037530664,0.00063234,0.0056330697,0.0020242087,0.000021136775,0.00006038921,0.00047267842,0.00032382552,0.00008427389,0.0009733344,0.95788544,0.031514015],"study_design_scores_gemma":[0.010686593,0.0017628119,0.15705661,0.006787278,0.00016949185,0.00047629888,0.007534965,0.0034713564,0.0016472581,0.01188093,0.79829144,0.00023488248],"about_ca_topic_score_codex":0.008211864,"about_ca_topic_score_gemma":0.017072054,"teacher_disagreement_score":0.76054186,"about_ca_system_score_codex":0.0012958302,"about_ca_system_score_gemma":0.002561347,"threshold_uncertainty_score":0.34155798},"labels":[],"label_agreement":null},{"id":"W6963759802","doi":"10.22004/ag.econ.236780","title":"Leadership in Sustainable Agribusiness, Innovation, and Solar Thermal Renewable Energy: Opportunities for Sustainable Agribusiness","year":2016,"lang":"en","type":"article","venue":"AgEcon Search (University of Minnesota, USA)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Gloom; Production (economics); Government (linguistics); Licensee","score_opus":0.06714554036268452,"score_gpt":0.20167587459819256,"score_spread":0.13453033423550803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6963759802","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068499832,0.021933137,0.0025783563,0.8340542,0.023164688,0.000059198755,0.000069914546,0.00024073603,0.11104982],"genre_scores_gemma":[0.22591066,0.041963764,0.006383516,0.21329503,0.011827433,0.00014246008,0.00019355067,0.00026838566,0.50001526],"study_design_codex":"not_applicable","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9956416,0.0011269852,0.00011674179,0.0003874361,0.0012679194,0.0014592467],"domain_scores_gemma":[0.98533154,0.0010245463,0.00046558006,0.00014019161,0.00188555,0.011152528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004298349,0.00054855424,0.00037629477,0.00061335554,0.0050855735,0.008925238,0.0008586117,0.0026614189,0.023071814],"category_scores_gemma":[0.0040910235,0.00019899348,0.00030905116,0.000726138,0.0038307144,0.0052652312,0.0044053174,0.0074056913,0.006723763],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003600839,0.00015154706,0.0017193918,0.00032343456,0.00001265876,0.00050361094,0.0045450684,0.0001378601,0.0012153413,0.07067513,0.8042107,0.116469204],"study_design_scores_gemma":[0.000011027633,0.00007228696,0.0009618263,0.00019138116,0.0000037759564,0.00020193493,0.0036441395,0.00009659605,0.00024278386,0.006420745,0.9881363,0.000017282518],"about_ca_topic_score_codex":0.0026149934,"about_ca_topic_score_gemma":0.006155634,"teacher_disagreement_score":0.023071814,"about_ca_system_score_codex":0.003887991,"about_ca_system_score_gemma":0.01110914,"threshold_uncertainty_score":0.07718295},"labels":[],"label_agreement":null},{"id":"W6976730344","doi":"10.60692/x0rgj-4aa51","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Tariff; Demand forecasting; Work (physics); Plan (archaeology); Demand management; Peak demand; Demand patterns; Supply and demand","score_opus":0.014514065384339475,"score_gpt":0.19124520906246664,"score_spread":0.17673114367812717,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6976730344","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009326117,0.0004294969,0.9633106,0.0010323557,0.000066683235,0.00015918424,0.00031671094,0.00019558774,0.025163315],"genre_scores_gemma":[0.63997126,0.0015114731,0.33445996,0.0005204003,0.00012552344,0.0008913955,0.0004266155,0.00025660856,0.02183681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923205,0.0003486644,0.000021381089,0.000121358746,0.00016078955,0.000115758485],"domain_scores_gemma":[0.99907637,0.0006350269,0.00008591336,0.00003130425,0.00011415532,0.000057349687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019110753,0.0014668655,0.0009886586,0.00079012604,0.0005659145,0.0021818161,0.0018868389,0.001858448,0.009859529],"category_scores_gemma":[0.0027283852,0.0008404872,0.0012638362,0.001148681,0.0010278133,0.0015173639,0.0014329773,0.0017982364,0.0007801199],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027785241,0.000048003556,0.00019883871,0.00007373975,0.000016673697,0.00007380307,0.00005570454,0.9243034,0.0003950098,0.06645014,0.0017260264,0.0066309096],"study_design_scores_gemma":[0.000020525946,0.000027850932,0.000072067865,0.00001583684,0.000007883598,0.000020105032,0.000029893341,0.982428,0.000112050926,0.015411022,0.0018467671,0.000007887072],"about_ca_topic_score_codex":0.011960625,"about_ca_topic_score_gemma":0.012220063,"teacher_disagreement_score":0.011960625,"about_ca_system_score_codex":0.0025515372,"about_ca_system_score_gemma":0.003218518,"threshold_uncertainty_score":0.032983422},"labels":[],"label_agreement":null},{"id":"W6984273041","doi":"","title":"Aero 13oct 2015","year":2015,"lang":"fr","type":"other","venue":"Bulletin of Miscellaneous Information (Royal Gardens Kew)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photography; Reflection (computer programming); Work (physics)","score_opus":0.005956999137625287,"score_gpt":0.17442966546081734,"score_spread":0.16847266632319205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6984273041","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011380543,0.0021014295,0.00059822097,0.004188962,0.011463103,0.0001663957,0.020358438,0.0013453241,0.95864],"genre_scores_gemma":[0.0030464344,0.00063582126,0.00020571837,0.00054512464,0.0005518482,0.000034781617,0.0061373566,0.00025773598,0.9885852],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991548,0.00003822304,0.000020180618,0.00008280392,0.0005338863,0.00017013935],"domain_scores_gemma":[0.9990006,0.000038282287,0.000033183966,0.00008080745,0.00069454865,0.00015250016],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00088274264,0.00083244784,0.00046728348,0.0014837041,0.0018453221,0.0047508553,0.0006357245,0.0016713977,0.4435792],"category_scores_gemma":[0.0021693697,0.00029306617,0.00038364838,0.0009235629,0.00036096046,0.0012829009,0.0016121768,0.0017044977,0.32771352],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006113132,0.000014478674,0.00025274805,0.00006786248,0.000003275969,0.00004075169,0.000026251539,0.00005222087,0.0002976118,0.001473404,0.97945625,0.018253945],"study_design_scores_gemma":[0.0000049460755,0.00000933115,0.0007515379,0.000045958095,0.0000013041064,0.0000086582595,0.000030596013,0.000029552246,0.000095885705,0.000117814176,0.9989011,0.000003242157],"about_ca_topic_score_codex":0.06816033,"about_ca_topic_score_gemma":0.21615823,"teacher_disagreement_score":0.5564208,"about_ca_system_score_codex":0.0027405273,"about_ca_system_score_gemma":0.0024668444,"threshold_uncertainty_score":0.7936667},"labels":[],"label_agreement":null},{"id":"W6989592608","doi":"","title":"Black &amp;amp; Veatch ‘Smart Grid’ Project in Canada Wins","year":2024,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Subject (documents); Focus (optics); Field (mathematics); Work (physics)","score_opus":0.015258548786419558,"score_gpt":0.21671727912892416,"score_spread":0.2014587303425046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989592608","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009410662,0.0010552118,0.0019410315,0.021568257,0.0013581375,0.00020098683,0.016492631,0.0015614545,0.94641155],"genre_scores_gemma":[0.013178341,0.0001924681,0.0005280652,0.00081613223,0.0000214757,0.000016304512,0.0018063049,0.00022611079,0.9832149],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984818,0.000045589564,0.000012231838,0.00008916219,0.0007086246,0.0006626604],"domain_scores_gemma":[0.9979432,0.00006337096,0.000022572116,0.00005579996,0.001169275,0.000745668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081208686,0.00073346274,0.0004211654,0.0010392056,0.0069236886,0.005169082,0.0012599977,0.0029257678,0.17229684],"category_scores_gemma":[0.0014533215,0.00051209994,0.0004692824,0.0013039979,0.0011906708,0.0011751703,0.0019347924,0.002028944,0.03314087],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009838953,0.000050360544,0.00115939,0.000052680494,0.000008756668,0.00010586524,0.00013830469,0.0003717572,0.00046955294,0.024630552,0.9434332,0.02948106],"study_design_scores_gemma":[0.000025973863,0.000015552314,0.0035495935,0.00003884456,0.0000043144896,0.000022174458,0.0003926553,0.0006575626,0.00057201274,0.0014050808,0.9933015,0.0000147128585],"about_ca_topic_score_codex":0.9790223,"about_ca_topic_score_gemma":0.99225086,"teacher_disagreement_score":0.17229684,"about_ca_system_score_codex":0.036681242,"about_ca_system_score_gemma":0.09829445,"threshold_uncertainty_score":0.5763903},"labels":[],"label_agreement":null},{"id":"W6989735454","doi":"","title":"Canada announces \"first and biggest\" smart grid system in North America","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Work (physics); Grid","score_opus":0.003181518156043853,"score_gpt":0.14067058050881245,"score_spread":0.1374890623527686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989735454","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010802324,0.0013563932,0.0012437411,0.047224924,0.004616641,0.00041168396,0.037925653,0.002458105,0.8939605],"genre_scores_gemma":[0.015635936,0.00057645526,0.0007272928,0.009206227,0.00018069493,0.000043776912,0.0063214903,0.00027457415,0.9670337],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981893,0.000040140545,0.000019608795,0.00006790019,0.001071137,0.0006118659],"domain_scores_gemma":[0.9965546,0.00010306261,0.000049269544,0.00006485309,0.0022254307,0.0010027535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009343873,0.0007282575,0.0004379896,0.0015751407,0.00655073,0.0058654025,0.0011808481,0.0040746457,0.07865648],"category_scores_gemma":[0.0021507188,0.00047868563,0.00076211954,0.0015765933,0.00095420924,0.0012503195,0.0014380128,0.003260225,0.016548537],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026312782,0.00003591482,0.0010685076,0.000033313267,0.000004886887,0.00007173254,0.00003557977,0.00013105711,0.00019461231,0.00316923,0.98875624,0.006472623],"study_design_scores_gemma":[0.000031652224,0.000016813576,0.009437424,0.000048081307,0.000010447924,0.00003004768,0.00032248587,0.00048264966,0.0006104356,0.00075956865,0.9882257,0.000024848097],"about_ca_topic_score_codex":0.9804017,"about_ca_topic_score_gemma":0.9932505,"teacher_disagreement_score":0.07865648,"about_ca_system_score_codex":0.033149406,"about_ca_system_score_gemma":0.11392434,"threshold_uncertainty_score":0.26313215},"labels":[],"label_agreement":null},{"id":"W6991334718","doi":"","title":"Flat opening for Toronto | RenewableEnergyWorld.com","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Intersection (aeronautics); Set (abstract data type); Perspective (graphical)","score_opus":0.006982232369297434,"score_gpt":0.2006928977059572,"score_spread":0.19371066533665976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991334718","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042751033,0.00025787705,0.0002975595,0.00082165515,0.00029072392,0.00004566536,0.014899508,0.0024250688,0.9805345],"genre_scores_gemma":[0.0021483304,0.00022781134,0.000117052026,0.00017334758,0.00006624278,0.000013663115,0.0055279997,0.0010905202,0.990635],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999696,0.000012462939,0.000006658657,0.000032675125,0.0001628834,0.00008927283],"domain_scores_gemma":[0.99855,0.00007046766,0.000038108134,0.00012038574,0.0004883161,0.0007327424],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002639644,0.0011686978,0.00043561187,0.0016874261,0.003026508,0.004242856,0.00082978286,0.0017078024,0.8564456],"category_scores_gemma":[0.0010303996,0.00054011197,0.00051427475,0.0023509513,0.00077142665,0.0022477093,0.0019919332,0.001611724,0.6556773],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014505492,0.000013339352,0.0001296116,0.000035499554,0.00000108362,0.00003044345,0.000023572842,0.000056141864,0.000068925336,0.001616686,0.98631907,0.011691215],"study_design_scores_gemma":[0.000006229827,0.0000060176667,0.00083007547,0.000039664672,0.0000011394543,0.000015818965,0.00005297191,0.000103469654,0.00016129605,0.0004202674,0.99835557,0.0000074411805],"about_ca_topic_score_codex":0.20033756,"about_ca_topic_score_gemma":0.5228671,"teacher_disagreement_score":0.8564456,"about_ca_system_score_codex":0.005038936,"about_ca_system_score_gemma":0.004572983,"threshold_uncertainty_score":0.3983429},"labels":[],"label_agreement":null},{"id":"W6992280334","doi":"","title":"The Latest Electrical Technologies and Their Applications in North Vancouver Homes","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Key (lock); Emerging technologies; Government (linguistics)","score_opus":0.004096937486882225,"score_gpt":0.17226218853801242,"score_spread":0.1681652510511302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6992280334","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06583247,0.015628908,0.0009879912,0.008395667,0.00067404006,0.00006182706,0.0021086072,0.0002702043,0.90604025],"genre_scores_gemma":[0.15473115,0.021063928,0.0016979048,0.00067414565,0.000115533134,0.000017764987,0.0010305344,0.00007055324,0.8205985],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995609,0.000038758004,0.000011286528,0.000028788389,0.00028383627,0.00007643329],"domain_scores_gemma":[0.9994199,0.00005769466,0.000024268997,0.000021297306,0.00035824304,0.00011853867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003142135,0.00027365147,0.00010910978,0.0009655397,0.0015535732,0.0029983148,0.00046533614,0.0005889713,0.022321003],"category_scores_gemma":[0.0006675759,0.00014756495,0.00012266441,0.0033374922,0.00032563508,0.0008169373,0.0007422709,0.0006774305,0.0036861748],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001223729,0.00016261869,0.018616334,0.00038217418,0.000008721089,0.00091357547,0.0012452776,0.0013011349,0.0022582216,0.010429744,0.30142856,0.66313136],"study_design_scores_gemma":[0.00001008626,0.000038613256,0.07515056,0.00023326493,0.000009053309,0.00031795993,0.0058590444,0.0012078013,0.0012869115,0.0014814464,0.9143782,0.000026969923],"about_ca_topic_score_codex":0.64002305,"about_ca_topic_score_gemma":0.92562175,"teacher_disagreement_score":0.35997695,"about_ca_system_score_codex":0.005381951,"about_ca_system_score_gemma":0.004020463,"threshold_uncertainty_score":0.7241938},"labels":[],"label_agreement":null},{"id":"W6996312988","doi":"","title":"Schneider Electric partners with NAIT's Centre for Grid Innovation to bring energy solutions to Alberta businesses","year":2021,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Electric energy; Grid; Government (linguistics); Electricity; Work (physics)","score_opus":0.013995434349399065,"score_gpt":0.22174276666339532,"score_spread":0.20774733231399625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996312988","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021171768,0.0003045233,0.0019150033,0.0062542767,0.001016426,0.00010803483,0.0013795882,0.0013359243,0.98556906],"genre_scores_gemma":[0.004121307,0.00015129852,0.0010167186,0.00059044536,0.000027765982,0.0000114301165,0.0008907024,0.00017114212,0.99301916],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99829596,0.00006220363,0.000012112076,0.000103226645,0.0011582682,0.00036820234],"domain_scores_gemma":[0.9970099,0.00011628089,0.000032762327,0.00011560487,0.0015817059,0.0011437027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013999349,0.0010853967,0.0003376828,0.001728671,0.0040679136,0.006013891,0.0010699944,0.003311612,0.27861232],"category_scores_gemma":[0.0013997556,0.00044708757,0.0005953024,0.0014330442,0.0011179816,0.0018986298,0.0018403147,0.002705132,0.10666214],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005809902,0.00018401041,0.0009064089,0.000042564643,0.00000609824,0.000118344324,0.000085095075,0.00038402245,0.0012157585,0.026108373,0.90238714,0.068504125],"study_design_scores_gemma":[0.000023041059,0.000024809193,0.0008020376,0.000020363315,0.0000046281098,0.000042345742,0.00021249357,0.00088471174,0.0008294307,0.0022545662,0.9948914,0.00001005302],"about_ca_topic_score_codex":0.42336234,"about_ca_topic_score_gemma":0.70443946,"teacher_disagreement_score":0.5766376,"about_ca_system_score_codex":0.012026723,"about_ca_system_score_gemma":0.035444017,"threshold_uncertainty_score":0.93205106},"labels":[],"label_agreement":null},{"id":"W6996684765","doi":"","title":"Sony and Hydro-Quebec Announce the Establishment of a Joint Venture to Start Development of a Large-Scale Energy Storage System for Power Grids - Today's Market News (MARKCOMM) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Start up; Joint venture; Power (physics); Energy storage; Joint (building); High energy; Energy (signal processing); Power grid","score_opus":0.005918200475240354,"score_gpt":0.1859514800951668,"score_spread":0.18003327961992643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996684765","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039028109,0.0015028456,0.0011537435,0.028797217,0.008425583,0.00025161952,0.008517498,0.0020684605,0.9453803],"genre_scores_gemma":[0.0044314764,0.0002633315,0.00020305511,0.0016006584,0.00020216299,0.000013681648,0.0013442797,0.0001564398,0.9917848],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989981,0.000033368993,0.000010692012,0.00005161326,0.00065846083,0.00024779516],"domain_scores_gemma":[0.99834335,0.000083101695,0.000036426725,0.00006848052,0.001067055,0.0004015668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073342747,0.0007629839,0.00045109686,0.0008225576,0.0033513217,0.0047699655,0.0008110946,0.0031315873,0.23461488],"category_scores_gemma":[0.0013065328,0.00044095312,0.0007746765,0.0007306026,0.0006991126,0.0011289611,0.0009603712,0.0031245025,0.06779],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059019418,0.00003643516,0.00044759677,0.000023716704,0.0000038900394,0.00011477812,0.000018669449,0.00007472475,0.00039048816,0.001770559,0.98422444,0.012835749],"study_design_scores_gemma":[0.000028123444,0.000027390397,0.0029006305,0.000019429073,0.000004417657,0.000039061997,0.000076745266,0.00033354366,0.00061504776,0.00028761188,0.9956547,0.000013257073],"about_ca_topic_score_codex":0.6242534,"about_ca_topic_score_gemma":0.8435332,"teacher_disagreement_score":0.3757466,"about_ca_system_score_codex":0.007959336,"about_ca_system_score_gemma":0.013244036,"threshold_uncertainty_score":0.78486496},"labels":[],"label_agreement":null},{"id":"W6999031394","doi":"","title":"Canada Invests in Smart Grid Technology for London Net-Zero Energy Community","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Energy (signal processing); Renewable energy; Work (physics); Field (mathematics)","score_opus":0.008109563580769814,"score_gpt":0.17551723129814356,"score_spread":0.16740766771737375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999031394","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055268,0.0012645284,0.0009564516,0.029897826,0.0021767926,0.0001372412,0.01297643,0.0009403834,0.9461236],"genre_scores_gemma":[0.0143168755,0.0006633011,0.000634429,0.002500694,0.000064921514,0.000021458985,0.0024694775,0.00019321729,0.9791357],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982962,0.000054169624,0.00002105843,0.00008306148,0.0009925637,0.0005530167],"domain_scores_gemma":[0.99650145,0.00008417383,0.000055943874,0.0000739316,0.0017842709,0.001500195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089431653,0.0009290613,0.00034944643,0.0014191038,0.0044042906,0.0050760694,0.0009987458,0.0030256736,0.16868196],"category_scores_gemma":[0.0022304284,0.00040973577,0.00074375246,0.0014001549,0.0010905836,0.0017069367,0.0019359142,0.002230594,0.044563435],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004529599,0.00003153728,0.00090146594,0.00006676436,0.0000052440464,0.00006935493,0.000046534024,0.00022864364,0.00024069221,0.01931633,0.9571211,0.021927102],"study_design_scores_gemma":[0.000016017728,0.000013309413,0.0012318467,0.00004797715,0.000004747292,0.000025123261,0.0001845162,0.0003078984,0.00030053084,0.0008934048,0.99696475,0.000009808254],"about_ca_topic_score_codex":0.9450337,"about_ca_topic_score_gemma":0.9796662,"teacher_disagreement_score":0.16868196,"about_ca_system_score_codex":0.041298997,"about_ca_system_score_gemma":0.100679986,"threshold_uncertainty_score":0.5642974},"labels":[],"label_agreement":null},{"id":"W6999134313","doi":"","title":"City of Vancouver Neighbourhood Energy Utility Converts SHARC Pilot Program to Lease","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lease; Pilot program; Neighbourhood (mathematics); Energy (signal processing); Electric utility; Work (physics)","score_opus":0.015877406938231437,"score_gpt":0.2112926896493206,"score_spread":0.19541528271108916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999134313","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077500977,0.00008346527,0.00042167687,0.0014706877,0.00026028816,0.00013282534,0.005827677,0.00052438234,0.983529],"genre_scores_gemma":[0.012016591,0.00007282628,0.0002585671,0.0002600452,0.000012071244,0.000025020408,0.0017615225,0.00008256188,0.9855108],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996592,0.000018039591,0.000003430609,0.000024951489,0.00016291592,0.00013150235],"domain_scores_gemma":[0.9991061,0.00003006562,0.000014563192,0.00003567331,0.0005138042,0.0002997436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003214099,0.00050173904,0.00022027406,0.0007513837,0.0031354704,0.0023661037,0.0006890197,0.0012628711,0.24457356],"category_scores_gemma":[0.00076314714,0.0002742321,0.00020825172,0.0006080017,0.00037342502,0.00052133924,0.00082506763,0.0013166098,0.058229785],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008953312,0.00016747563,0.0028487695,0.000039063794,0.000002974214,0.000156624,0.00005556471,0.0003344938,0.0004770275,0.003839276,0.9392446,0.052744545],"study_design_scores_gemma":[0.00003592611,0.00003560678,0.0086571565,0.000037249803,0.00000394173,0.000043478347,0.00043256953,0.0008180863,0.0006005974,0.0006080771,0.98871803,0.000009315781],"about_ca_topic_score_codex":0.6050041,"about_ca_topic_score_gemma":0.8786942,"teacher_disagreement_score":0.6050041,"about_ca_system_score_codex":0.004750429,"about_ca_system_score_gemma":0.01106801,"threshold_uncertainty_score":0.8181801},"labels":[],"label_agreement":null},{"id":"W6999138661","doi":"","title":"Canadian Solar rolls out new grid-tied residential energy storage solution (NASDAQ:CSIQ)","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Solar energy; Renewable energy; Production (economics); Energy (signal processing); Energy storage","score_opus":0.008930062842016457,"score_gpt":0.18864710997278336,"score_spread":0.17971704713076692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999138661","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017679429,0.0010251553,0.0029260213,0.030312264,0.0028364896,0.000538758,0.04416202,0.0028375501,0.89768225],"genre_scores_gemma":[0.04389169,0.0007948334,0.0031543935,0.0045324108,0.00010990747,0.000054801832,0.011132045,0.0003813296,0.9359486],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907875,0.000022681266,0.000010252236,0.00004082558,0.0006417846,0.00020564573],"domain_scores_gemma":[0.9985916,0.000033355096,0.000019994162,0.000052089068,0.0010880859,0.00021486117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079346524,0.00069472345,0.00031355425,0.0008947831,0.00364028,0.0026146723,0.00092861225,0.0019030166,0.09125572],"category_scores_gemma":[0.0013680103,0.00036899693,0.00055298203,0.0013421285,0.00068469543,0.0008544958,0.00089664414,0.0016489216,0.014498502],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009262604,0.00007259825,0.0010490677,0.000040922172,0.000008134958,0.000071307084,0.00003450531,0.0004933645,0.00096732384,0.005949779,0.96551484,0.025705405],"study_design_scores_gemma":[0.000059745853,0.000030249352,0.007230676,0.00002739241,0.00000838579,0.000032728753,0.00018421367,0.0014433912,0.0014081377,0.00081358606,0.9887406,0.000020789481],"about_ca_topic_score_codex":0.9573546,"about_ca_topic_score_gemma":0.9824179,"teacher_disagreement_score":0.9573546,"about_ca_system_score_codex":0.022477103,"about_ca_system_score_gemma":0.05637707,"threshold_uncertainty_score":0.3052808},"labels":[],"label_agreement":null},{"id":"W6999302391","doi":"","title":"City of Vancouver Neighbourhood Energy Utility Converts SHARC Pilot Program to Lease","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lease; Pilot program; Neighbourhood (mathematics); Energy (signal processing); Electric utility; Work (physics)","score_opus":0.015877406938231437,"score_gpt":0.2112926896493206,"score_spread":0.19541528271108916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999302391","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077500977,0.00008346527,0.00042167687,0.0014706877,0.00026028816,0.00013282534,0.005827677,0.00052438234,0.983529],"genre_scores_gemma":[0.012016591,0.00007282628,0.0002585671,0.0002600452,0.000012071244,0.000025020408,0.0017615225,0.00008256188,0.9855108],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996592,0.000018039591,0.000003430609,0.000024951489,0.00016291592,0.00013150235],"domain_scores_gemma":[0.9991061,0.00003006562,0.000014563192,0.00003567331,0.0005138042,0.0002997436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003214099,0.00050173904,0.00022027406,0.0007513837,0.0031354704,0.0023661037,0.0006890197,0.0012628711,0.24457356],"category_scores_gemma":[0.00076314714,0.0002742321,0.00020825172,0.0006080017,0.00037342502,0.00052133924,0.00082506763,0.0013166098,0.058229785],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008953312,0.00016747563,0.0028487695,0.000039063794,0.000002974214,0.000156624,0.00005556471,0.0003344938,0.0004770275,0.003839276,0.9392446,0.052744545],"study_design_scores_gemma":[0.00003592611,0.00003560678,0.0086571565,0.000037249803,0.00000394173,0.000043478347,0.00043256953,0.0008180863,0.0006005974,0.0006080771,0.98871803,0.000009315781],"about_ca_topic_score_codex":0.6050041,"about_ca_topic_score_gemma":0.8786942,"teacher_disagreement_score":0.39499593,"about_ca_system_score_codex":0.004750429,"about_ca_system_score_gemma":0.01106801,"threshold_uncertainty_score":0.8181801},"labels":[],"label_agreement":null},{"id":"W6999486366","doi":"","title":"Contrasting of VivoPower International PLC (VVPR) and Canadian Solar Inc. (NASDAQ:CSIQ)","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Legislation; Production (economics)","score_opus":0.003835640217593323,"score_gpt":0.17340927594207098,"score_spread":0.16957363572447764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999486366","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030637116,0.0010332303,0.000817641,0.010610234,0.0011260108,0.000064770386,0.0126636,0.0003751503,0.9702458],"genre_scores_gemma":[0.014697074,0.0008212259,0.0006507404,0.0012272735,0.00011535695,0.000019786356,0.0052755363,0.00025088468,0.976942],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99846774,0.000055867687,0.000031743442,0.00010751458,0.0010253142,0.00031173456],"domain_scores_gemma":[0.994873,0.00018087155,0.00012672169,0.00015411447,0.00397327,0.0006920759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011180989,0.00056150684,0.00027834417,0.0020450288,0.002826529,0.0038823094,0.0006452617,0.0013061813,0.20317113],"category_scores_gemma":[0.0033386266,0.00030953094,0.00030789126,0.002268751,0.0007305973,0.0015401616,0.001202078,0.0015509651,0.03827565],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008808582,0.000037333397,0.0019054691,0.000082879196,0.0000032774074,0.00009256138,0.000111460446,0.00020791245,0.00036253937,0.021397466,0.9253837,0.05032735],"study_design_scores_gemma":[0.000005181589,0.000004604805,0.0038374644,0.000043658434,0.000002052657,0.000032812397,0.00016197843,0.00017060089,0.00027259006,0.0006023577,0.99486154,0.0000051704237],"about_ca_topic_score_codex":0.5984876,"about_ca_topic_score_gemma":0.7371916,"teacher_disagreement_score":0.40151238,"about_ca_system_score_codex":0.00973172,"about_ca_system_score_gemma":0.026888628,"threshold_uncertainty_score":0.8077539},"labels":[],"label_agreement":null},{"id":"W6999991877","doi":"","title":"Dimming for peak demand reduction","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Peak demand; Energy consumption; Noise reduction; Demand reduction","score_opus":0.006205601776175193,"score_gpt":0.1969084676861277,"score_spread":0.1907028659099525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999991877","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51705337,0.011403989,0.13931304,0.0039862734,0.0008004918,0.00011891277,0.0005911521,0.0033084592,0.32342428],"genre_scores_gemma":[0.9755408,0.0014915079,0.0067359633,0.0004053538,0.000108872606,0.000017771998,0.00009315778,0.000071750976,0.015534807],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99986386,0.00003840196,0.000004033514,0.000015135946,0.000051449722,0.000027010676],"domain_scores_gemma":[0.9998834,0.000041417596,0.000016608205,0.000017504395,0.000029415778,0.000011607407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015579283,0.00018025868,0.00017695222,0.0003271243,0.00046719884,0.00065772544,0.0003841106,0.00031333402,0.011790915],"category_scores_gemma":[0.00027617134,0.00009883847,0.00021909646,0.0005767074,0.00020531089,0.0004998794,0.00032408469,0.00047278727,0.0009833032],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018234414,0.00047015105,0.004459346,0.0008452616,0.00006810607,0.00037707327,0.00048126918,0.015509749,0.20780115,0.0633353,0.028815089,0.67601407],"study_design_scores_gemma":[0.0002710143,0.0024379217,0.038332824,0.00034338687,0.00024599498,0.0013640848,0.0020968642,0.07934092,0.42280298,0.08148572,0.37111008,0.00016825108],"about_ca_topic_score_codex":0.0008160597,"about_ca_topic_score_gemma":0.0019910755,"teacher_disagreement_score":0.011790915,"about_ca_system_score_codex":0.000377202,"about_ca_system_score_gemma":0.0003080551,"threshold_uncertainty_score":0.039444506},"labels":[],"label_agreement":null},{"id":"W7000942583","doi":"","title":"Impact of P2P power trading on rooftop PV in Alberta","year":2018,"lang":"en","type":"dissertation","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Renewable energy; Government (linguistics); Production (economics); Power grid","score_opus":0.004187841221169708,"score_gpt":0.20720017070346497,"score_spread":0.20301232948229525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000942583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9260266,0.00039188875,0.0004590789,0.0021052698,0.000042952004,0.000020093014,0.0014115094,0.000054324184,0.06948838],"genre_scores_gemma":[0.9827685,0.00026708425,0.00014828875,0.000077801065,0.000007526265,0.000002696047,0.00040279335,0.00001366451,0.01631174],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962175,0.000032627577,0.000007053794,0.00004059209,0.00014055429,0.00015730574],"domain_scores_gemma":[0.99959713,0.0000435009,0.000021146569,0.000015459242,0.0002449252,0.0000779301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025955884,0.000159854,0.00021388345,0.00030151475,0.0011042726,0.0022235762,0.00075416086,0.0006794066,0.00669723],"category_scores_gemma":[0.0007466499,0.00014780648,0.00037045,0.0008745406,0.00060679414,0.0005510314,0.00090003456,0.0007918838,0.0004498923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0053157094,0.0010000374,0.36223972,0.0004514289,0.000555632,0.012432651,0.003013327,0.25178015,0.032700732,0.075702995,0.07262027,0.18218748],"study_design_scores_gemma":[0.00024156063,0.00031181483,0.75156206,0.00015951328,0.0002507795,0.00051242614,0.015202781,0.102352545,0.007993964,0.008164603,0.11311226,0.00013567858],"about_ca_topic_score_codex":0.94451106,"about_ca_topic_score_gemma":0.96882534,"teacher_disagreement_score":0.055488944,"about_ca_system_score_codex":0.016143244,"about_ca_system_score_gemma":0.011397104,"threshold_uncertainty_score":0.117128015},"labels":[],"label_agreement":null},{"id":"W7002330071","doi":"","title":"Non-take-up of benefits at the start of the COVID-19 pandemic","year":2021,"lang":"en","type":"book","venue":"University of Salford Institutional Repository (University of Salford)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pandemic; Surprise; Quarter (Canadian coin); Government (linguistics); Coronavirus disease 2019 (COVID-19); Mindset; Psychological intervention; Conditionality; Process (computing)","score_opus":0.01972277769609035,"score_gpt":0.17221574771029743,"score_spread":0.15249297001420709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002330071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7372437,0.0010753671,0.001271011,0.064440414,0.0008557833,0.0003749484,0.0019424782,0.00008485387,0.19271141],"genre_scores_gemma":[0.9673876,0.00037219678,0.0005179531,0.011394061,0.00018662056,0.00016715306,0.00041447312,0.00004108304,0.019518908],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99036574,0.0031649894,0.00025357684,0.00062387396,0.002264952,0.0033267217],"domain_scores_gemma":[0.9753362,0.009905111,0.0042828456,0.0018275809,0.0029279287,0.005720348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009330304,0.00016710834,0.00035394623,0.00048848253,0.0031160347,0.0034908424,0.0008355747,0.0019831671,0.027596937],"category_scores_gemma":[0.037569374,0.00028224444,0.0003623684,0.00054488546,0.0020285232,0.0033537499,0.003965156,0.00428547,0.0022580877],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013111964,0.0008213798,0.49949446,0.0010033632,0.000092207076,0.003740034,0.08339115,0.0005231849,0.0035682959,0.061349574,0.1524215,0.19228363],"study_design_scores_gemma":[0.000066452856,0.00055738236,0.72732675,0.0010554047,0.000027482192,0.0006723109,0.07119463,0.0005139192,0.00083878485,0.00636391,0.19128487,0.00009805204],"about_ca_topic_score_codex":0.030382844,"about_ca_topic_score_gemma":0.051009253,"teacher_disagreement_score":0.030382844,"about_ca_system_score_codex":0.0032472503,"about_ca_system_score_gemma":0.0063941805,"threshold_uncertainty_score":0.09232098},"labels":[],"label_agreement":null},{"id":"W7007950934","doi":"","title":"Alpha Technologies solves the power issue with Indoor DAS Networks by... -- VANCOUVER, British Columbia, June 5, 2012 /PRNewswire/ --","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Alpha (finance); Relation (database); Key (lock)","score_opus":0.002784693069844434,"score_gpt":0.1714399559762865,"score_spread":0.16865526290644206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007950934","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005774971,0.0027549178,0.029568622,0.017243823,0.0028751576,0.0000801189,0.0006765054,0.0038161986,0.9372096],"genre_scores_gemma":[0.05232939,0.0034671715,0.0047859354,0.0013124078,0.0004344388,0.000017840268,0.00043705144,0.0004961293,0.9367196],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99969375,0.000035566325,0.000005260622,0.000022131324,0.00017028306,0.00007308824],"domain_scores_gemma":[0.99953616,0.000046345343,0.000011154739,0.00004817352,0.00028905517,0.00006908829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000398037,0.0005892824,0.0002263655,0.00035293895,0.0017974217,0.0023340175,0.00040209809,0.0009746068,0.079499885],"category_scores_gemma":[0.000684458,0.0002252885,0.0001916934,0.0007373312,0.00037176444,0.0013051094,0.00081413775,0.001370899,0.024898611],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005831353,0.000040314633,0.0005388475,0.00006214883,0.0000062429062,0.000113318536,0.00010826035,0.0012627904,0.0028821467,0.015762849,0.8363376,0.1428271],"study_design_scores_gemma":[0.000013507914,0.000028880682,0.00054146175,0.000039402097,0.000009200078,0.0001352589,0.00022106463,0.0026172693,0.0035591465,0.003699279,0.9891264,0.000009164089],"about_ca_topic_score_codex":0.03378777,"about_ca_topic_score_gemma":0.17434919,"teacher_disagreement_score":0.9662122,"about_ca_system_score_codex":0.0015427971,"about_ca_system_score_gemma":0.002271907,"threshold_uncertainty_score":0.2659536},"labels":[],"label_agreement":null},{"id":"W7008200559","doi":"","title":"BuildingIQ Delivered More than $1 Million in Free Cash Flow in First Quarter Based on Energy Savings - retrofit","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cash flow; Quarter (Canadian coin); Energy (signal processing); Flow (mathematics); Energy consumption; Cash","score_opus":0.0063718205874367774,"score_gpt":0.1825927169744054,"score_spread":0.17622089638696864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008200559","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032288928,0.00052973384,0.005053464,0.0048158863,0.0013948118,0.00022768178,0.014581171,0.00586777,0.9352406],"genre_scores_gemma":[0.13031913,0.0006202995,0.003907448,0.0012742986,0.00020582441,0.00008425713,0.015029629,0.0008196274,0.8477395],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991737,0.00006274812,0.000015474387,0.000053759777,0.000520528,0.00017378878],"domain_scores_gemma":[0.99924785,0.00008297337,0.000034058114,0.00005958819,0.00034784045,0.0002276587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093280536,0.000678657,0.00020634022,0.0016120516,0.0012112275,0.0020514347,0.00066343363,0.00075475016,0.1193265],"category_scores_gemma":[0.0023081296,0.00030235475,0.00043940605,0.00092294795,0.00026912687,0.0010369186,0.0016256867,0.0014674558,0.030627716],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019436431,0.00044542205,0.004385809,0.00014914243,0.000024524732,0.00012812426,0.00013984297,0.0012633315,0.0025924116,0.02128655,0.76120925,0.20818117],"study_design_scores_gemma":[0.00003877043,0.00011565599,0.013010351,0.00006650273,0.000016356269,0.00007763414,0.0002547361,0.0023858259,0.0029329848,0.001989703,0.97908795,0.00002348305],"about_ca_topic_score_codex":0.025275074,"about_ca_topic_score_gemma":0.051045757,"teacher_disagreement_score":0.1193265,"about_ca_system_score_codex":0.0023715522,"about_ca_system_score_gemma":0.0038584487,"threshold_uncertainty_score":0.3991869},"labels":[],"label_agreement":null},{"id":"W7008645755","doi":"","title":"Chesapeake Utilities Corporation Reports Third Quarter 2020 Results","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Corporation; Corporate governance","score_opus":0.009269128731543324,"score_gpt":0.18090335637825453,"score_spread":0.1716342276467112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008645755","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00520846,0.0007941328,0.0018014571,0.0068374914,0.004199975,0.00037013498,0.09248287,0.002104432,0.88620114],"genre_scores_gemma":[0.009562261,0.0003761393,0.0011655147,0.0025809773,0.00018629605,0.00011824769,0.03735832,0.00033542086,0.94831675],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982157,0.00010877437,0.000030855284,0.00008833365,0.0013224351,0.00023396457],"domain_scores_gemma":[0.9963301,0.00021050063,0.00008300912,0.000119530625,0.0025753472,0.00068153185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020768533,0.0014054846,0.00039535578,0.0019069922,0.0013466759,0.0044665816,0.0011490111,0.0018588073,0.22341858],"category_scores_gemma":[0.0032742445,0.0003222254,0.00081005995,0.001182361,0.00044202965,0.0013763156,0.00090125395,0.0015592952,0.13002656],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006757458,0.000051338855,0.00031273777,0.000025398364,0.0000028350262,0.000018071456,0.000004835091,0.00020013136,0.00012614955,0.0007802601,0.9874077,0.011002981],"study_design_scores_gemma":[0.00008559189,0.00006909959,0.004189478,0.00004692831,0.000017224656,0.000023114075,0.00007218187,0.0010281111,0.0010096641,0.0010748244,0.9923666,0.000017197985],"about_ca_topic_score_codex":0.14984159,"about_ca_topic_score_gemma":0.20538092,"teacher_disagreement_score":0.22341858,"about_ca_system_score_codex":0.004110566,"about_ca_system_score_gemma":0.0070112976,"threshold_uncertainty_score":0.7474096},"labels":[],"label_agreement":null},{"id":"W7010187875","doi":"","title":"Global Grid Connected PV Systems Market 2018-2022 with Canadian Solar, Hanwha Group, Huawei Technologies, JA SOLAR, JinkoSolar &amp;amp; Trina Solar Dominating","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Grid; Dominating set; Renewable energy; Grid-connected photovoltaic power system","score_opus":0.007814164632473681,"score_gpt":0.189143517919482,"score_spread":0.18132935328700833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010187875","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008344501,0.0013910685,0.0031362805,0.00533527,0.002003001,0.00017071862,0.05127026,0.00214214,0.9262067],"genre_scores_gemma":[0.047642317,0.0015347545,0.002444463,0.00080660486,0.0003657063,0.00007247359,0.04106226,0.0005840956,0.9054873],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999673,0.000011598625,0.0000041901767,0.00003226708,0.00022085925,0.00005810107],"domain_scores_gemma":[0.99940264,0.000017628425,0.000021596696,0.00002330279,0.0004276189,0.000107333486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038180986,0.00081805716,0.00028413194,0.0009683928,0.0010673088,0.0025502802,0.00084485445,0.0007843172,0.12147257],"category_scores_gemma":[0.00069259777,0.0002157432,0.00036102603,0.0018403734,0.00029680057,0.0016890503,0.00080974784,0.00088898407,0.03596576],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008173088,0.000038634116,0.00084623584,0.00006868929,0.0000048536085,0.000057847705,0.0000271203,0.0006137643,0.0006854049,0.008500082,0.92673326,0.06234238],"study_design_scores_gemma":[0.000020062434,0.000019587822,0.0036880272,0.000038832783,0.0000062565136,0.00003619344,0.000103689476,0.0015785153,0.0009895434,0.0017724864,0.99173975,0.0000070342267],"about_ca_topic_score_codex":0.14161654,"about_ca_topic_score_gemma":0.28903773,"teacher_disagreement_score":0.8583835,"about_ca_system_score_codex":0.0044333735,"about_ca_system_score_gemma":0.006043634,"threshold_uncertainty_score":0.40636623},"labels":[],"label_agreement":null},{"id":"W7014096232","doi":"","title":"Ontario invests in energate to lead smart grid consumer engagement","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lead (geology); Key (lock); Customer engagement; Government (linguistics); Work (physics); Smart grid","score_opus":0.019593826771571114,"score_gpt":0.20611076391400535,"score_spread":0.18651693714243422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014096232","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012466705,0.0005083268,0.00083672925,0.014221243,0.00032695042,0.00019246605,0.0063819787,0.00032251648,0.9647431],"genre_scores_gemma":[0.036572564,0.00042522108,0.0005656582,0.0012724738,0.000051384945,0.000040104635,0.001181693,0.0001289866,0.95976204],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981242,0.000097251555,0.00002715925,0.00008336616,0.001072181,0.0005959272],"domain_scores_gemma":[0.9951167,0.00024289836,0.00014685593,0.00016070472,0.0028454517,0.0014872901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007804504,0.0005289186,0.00026164818,0.0012753572,0.007690893,0.0042463955,0.0007349079,0.0019309305,0.11296177],"category_scores_gemma":[0.0032870532,0.0005121034,0.0005403908,0.0019102677,0.001135528,0.0013824143,0.0016786893,0.0014677431,0.0118918875],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012422494,0.00010072579,0.008242058,0.0001174254,0.000013803651,0.0001875245,0.0005321528,0.00037734205,0.00042290462,0.022116564,0.9231315,0.044633728],"study_design_scores_gemma":[0.000039649487,0.00003424332,0.018956905,0.00005589101,0.000017840106,0.00007009113,0.001197823,0.0005355101,0.00057184324,0.0011256204,0.9773752,0.000019469304],"about_ca_topic_score_codex":0.95341635,"about_ca_topic_score_gemma":0.99019265,"teacher_disagreement_score":0.11296177,"about_ca_system_score_codex":0.039416317,"about_ca_system_score_gemma":0.09312183,"threshold_uncertainty_score":0.37789476},"labels":[],"label_agreement":null},{"id":"W7014242400","doi":"","title":"Ottawa storm 2022: Manotick man powers neighbourhood with 'microgrid' house","year":2022,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Storm; Neighbourhood (mathematics); Work (physics); Population","score_opus":0.0032989511550598756,"score_gpt":0.16395078979221298,"score_spread":0.1606518386371531,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014242400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013380465,0.00035244675,0.00063776114,0.0024364674,0.0013744097,0.00008167198,0.0038857781,0.001704587,0.98818874],"genre_scores_gemma":[0.0027174975,0.00011096539,0.00015886464,0.00016196199,0.000037386533,0.000008558462,0.00056879903,0.00021762175,0.99601835],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966705,0.000025076877,0.0000063203365,0.00003579943,0.00017403784,0.000091753565],"domain_scores_gemma":[0.9994492,0.000019454226,0.000015421294,0.000047931408,0.00021720036,0.00025087903],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00040707475,0.0008997464,0.00038724995,0.00054048485,0.003940074,0.003713491,0.00083954673,0.0018007528,0.6158453],"category_scores_gemma":[0.00066727924,0.00054663536,0.00041049192,0.0008815226,0.0006304492,0.0013211136,0.0018451816,0.0014090475,0.27393967],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056097026,0.000018415032,0.000158722,0.00002310461,0.0000022720096,0.000066749526,0.0000368801,0.00023170067,0.00019734369,0.0016054236,0.9847835,0.01281984],"study_design_scores_gemma":[0.000010277799,0.00001060025,0.00042258904,0.000014742106,0.0000013494016,0.000018572535,0.000088631234,0.000245524,0.00013043848,0.00037144363,0.99867994,0.0000059154668],"about_ca_topic_score_codex":0.22595385,"about_ca_topic_score_gemma":0.61853606,"teacher_disagreement_score":0.7740462,"about_ca_system_score_codex":0.0028778145,"about_ca_system_score_gemma":0.0050960914,"threshold_uncertainty_score":0.54795},"labels":[],"label_agreement":null},{"id":"W7014839477","doi":"","title":"PSE&amp;amp;G residential electric bills to increase 2.1 percent on June 1","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Government (linguistics); Consumption (sociology); Payment; Quarter (Canadian coin)","score_opus":0.015549563390816666,"score_gpt":0.23373742951217277,"score_spread":0.2181878661213561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014839477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0143238725,0.00046673682,0.0015866372,0.013137619,0.004651482,0.00030094374,0.022075526,0.0038675007,0.9395896],"genre_scores_gemma":[0.040262613,0.00037319056,0.0005999363,0.004762452,0.0005500696,0.00008372674,0.008016636,0.00039716798,0.9449542],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993892,0.00004288099,0.000014588589,0.000049336842,0.0003468678,0.00015716194],"domain_scores_gemma":[0.9994253,0.00007518171,0.000035835375,0.00005716371,0.00026817335,0.00013831859],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005511178,0.0004879606,0.00023027738,0.0006975806,0.0010688575,0.0016540177,0.00057735085,0.002157303,0.12515683],"category_scores_gemma":[0.00231374,0.00029202778,0.0005713203,0.00046274517,0.0003013975,0.0008812756,0.0008775949,0.0015650056,0.057150576],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008743489,0.000065254295,0.0011072963,0.000027853172,0.0000041481217,0.00006270288,0.000024387517,0.00016967989,0.0005661598,0.0027413126,0.97974956,0.015394068],"study_design_scores_gemma":[0.00003936895,0.00007981065,0.020073166,0.000035871384,0.0000067238484,0.000064670916,0.00008140184,0.0006188548,0.001148647,0.000910669,0.9769304,0.000010462111],"about_ca_topic_score_codex":0.018561926,"about_ca_topic_score_gemma":0.053892758,"teacher_disagreement_score":0.12515683,"about_ca_system_score_codex":0.0010623954,"about_ca_system_score_gemma":0.0014334973,"threshold_uncertainty_score":0.41869134},"labels":[],"label_agreement":null},{"id":"W7015722515","doi":"","title":"Traditional Belgian beers and Canadian Microbrewery, can GCxGC taste the difference?","year":2016,"lang":"en","type":"other","venue":"Open Repository and Bibliography (University of Liège)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Taste; Wine tasting; Bitter taste","score_opus":0.010095169903172536,"score_gpt":0.16141907788644366,"score_spread":0.15132390798327114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015722515","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13001595,0.04984578,0.00027779548,0.041333783,0.0010300388,0.000031359017,0.008566889,0.00011225408,0.7687862],"genre_scores_gemma":[0.68527687,0.028932987,0.00042027238,0.0040782862,0.0003771185,0.000020403628,0.0028906765,0.00016158733,0.27784187],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99922025,0.00007114728,0.000014696445,0.000065540706,0.0003592802,0.0002691698],"domain_scores_gemma":[0.9987086,0.00025479673,0.00014227482,0.00004993049,0.0005736678,0.00027077302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006616319,0.0002803654,0.00037671957,0.0026761172,0.004263985,0.007962119,0.00054168,0.001171299,0.06685164],"category_scores_gemma":[0.0032730568,0.00013692885,0.0002653985,0.007437301,0.002097465,0.00220268,0.0009334685,0.0009923157,0.003674591],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010254213,0.00016372745,0.03533796,0.0013071834,0.00010385357,0.00075247564,0.028626801,0.00028566353,0.0008427203,0.15930015,0.4986715,0.27358246],"study_design_scores_gemma":[0.000026043228,0.000034844506,0.16018039,0.00075889594,0.00006921382,0.00020293117,0.033082318,0.0001561877,0.0004621479,0.004075807,0.80088854,0.00006277031],"about_ca_topic_score_codex":0.9059433,"about_ca_topic_score_gemma":0.9475126,"teacher_disagreement_score":0.094056726,"about_ca_system_score_codex":0.017503971,"about_ca_system_score_gemma":0.015367442,"threshold_uncertainty_score":0.22364104},"labels":[],"label_agreement":null},{"id":"W7016123489","doi":"","title":"Wharfedale Technologies Secures a Multi-Year Contract to Provide SAP HANA(r) Support Services to a Multi-Billion Dollar Renewable Energy Company in Western Canada","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Liberian dollar; Government (linguistics); Production (economics); Boom","score_opus":0.006994421299627064,"score_gpt":0.19979122456402404,"score_spread":0.19279680326439697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016123489","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059064515,0.00013473413,0.0027403121,0.0015413368,0.00020173706,0.00015364977,0.0036432394,0.0019765098,0.98370206],"genre_scores_gemma":[0.009388938,0.00006764904,0.0008507202,0.00013136852,0.000011853355,0.00001867514,0.0015871159,0.0003045503,0.98763907],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988042,0.000026123433,0.000012316839,0.00006956529,0.0007961406,0.00029168892],"domain_scores_gemma":[0.99766564,0.00009970281,0.000043258715,0.00018504787,0.0015315484,0.00047469212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008353302,0.0005672222,0.00032444327,0.0015527206,0.0040840437,0.0037693959,0.0009205991,0.0016011586,0.19579935],"category_scores_gemma":[0.0017388603,0.00040287964,0.0003334399,0.0011259425,0.00092675386,0.0012178093,0.0010956721,0.0013366261,0.06925553],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013736267,0.00015321604,0.0018689937,0.00005451537,0.00000983159,0.00017331542,0.00020272213,0.0006847976,0.0027877432,0.023759212,0.88070214,0.08946613],"study_design_scores_gemma":[0.000021318043,0.000028755203,0.0029002866,0.000021491616,0.000003830482,0.00005337896,0.00021931987,0.0020396006,0.0023550466,0.001572448,0.9907684,0.000016086438],"about_ca_topic_score_codex":0.6004798,"about_ca_topic_score_gemma":0.8108599,"teacher_disagreement_score":0.39952022,"about_ca_system_score_codex":0.009260144,"about_ca_system_score_gemma":0.02049302,"threshold_uncertainty_score":0.8037461},"labels":[],"label_agreement":null},{"id":"W7017749371","doi":"","title":"Building Demand Response and the Electric Grid: Development and Application of an Operational Cross-Sectoral Model of Building-Side Electrification and Supply-Side Renewable Energy Integration","year":2023,"lang":"en","type":"dissertation","venue":"UVic’s Research and Learning Repository (University of Victoria)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Renewable energy; Demand response; Electricity; Electricity retailing; Supply and demand; Variable renewable energy; Electricity generation; Electricity demand","score_opus":0.013816409341049668,"score_gpt":0.2569302205220447,"score_spread":0.24311381118099507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017749371","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12281462,0.00029868577,0.8053055,0.0016093019,0.00009577137,0.000186725,0.0007086001,0.00042883988,0.06855205],"genre_scores_gemma":[0.89344895,0.00042912338,0.09283193,0.00011077299,0.00003403993,0.00032877846,0.00040545675,0.00013952126,0.012271438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977666,0.000093674586,0.000011157605,0.000038757946,0.00004918236,0.000030478843],"domain_scores_gemma":[0.99966216,0.00017406156,0.000040795967,0.000032695156,0.000060920338,0.000029432782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063267484,0.00056631677,0.00045451018,0.00030579115,0.00040465523,0.0016695721,0.0014539812,0.0014012555,0.0034863984],"category_scores_gemma":[0.0012106202,0.0003712088,0.000766872,0.0004931211,0.0006335147,0.0015839587,0.0013901739,0.0016031044,0.00043445363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012222132,0.00002668859,0.00032409123,0.000011552562,0.00000726801,0.000033891327,0.000050161372,0.9629731,0.00030337909,0.034116656,0.0001993238,0.0019417363],"study_design_scores_gemma":[0.000004678228,0.0000060890034,0.00005027224,0.0000032394878,0.0000029876596,0.0000041976577,0.000016107664,0.99502426,0.000109460685,0.003938323,0.0008374465,0.000002913328],"about_ca_topic_score_codex":0.0143108545,"about_ca_topic_score_gemma":0.010109824,"teacher_disagreement_score":0.0143108545,"about_ca_system_score_codex":0.0014277344,"about_ca_system_score_gemma":0.0017688476,"threshold_uncertainty_score":0.028455138},"labels":[],"label_agreement":null},{"id":"W7019224430","doi":"","title":"Federal and Manitoba Government teaming up to help farms and other organizations switch to renewable energyPR NewswireToday at 5:30pm UTC","year":2024,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Renewable energy; Work (physics); Public policy","score_opus":0.00596016302383263,"score_gpt":0.19034297530310113,"score_spread":0.1843828122792685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019224430","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022330994,0.00026849235,0.00042348617,0.008953659,0.0021965166,0.00020871573,0.009078688,0.002283931,0.9743533],"genre_scores_gemma":[0.0012593089,0.00008904295,0.00016367511,0.000990312,0.00005114189,0.0000289708,0.0014051117,0.00029154128,0.99572104],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995559,0.000024142648,0.0000065167965,0.000034071407,0.00020855508,0.00017084334],"domain_scores_gemma":[0.99882215,0.000062202715,0.00002428318,0.0000616289,0.0006353341,0.0003943589],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00053641596,0.0009474471,0.0003770052,0.0014876039,0.006931965,0.0046482836,0.0009851523,0.002971051,0.5454579],"category_scores_gemma":[0.0011602582,0.0006799761,0.0007316529,0.0014258479,0.0006632443,0.0012516583,0.0017990043,0.0024403017,0.27492857],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000136289955,0.00004030774,0.00026155647,0.00001800864,0.0000013893144,0.000037877246,0.000037417474,0.000031791464,0.00014125084,0.0004408755,0.9917563,0.007219716],"study_design_scores_gemma":[0.000017134575,0.000014498208,0.0027069654,0.000030635973,0.0000035386213,0.000014099827,0.00031028618,0.00011149665,0.00034118188,0.0002365917,0.99620193,0.0000116203],"about_ca_topic_score_codex":0.39554745,"about_ca_topic_score_gemma":0.73748624,"teacher_disagreement_score":0.60445255,"about_ca_system_score_codex":0.0051693935,"about_ca_system_score_gemma":0.013340492,"threshold_uncertainty_score":0.7864902},"labels":[],"label_agreement":null},{"id":"W7019780134","doi":"","title":"IEEE SmartGridComm 2013 to Explore the Sustainable Growth of Today’s Electric Grids from October 21 – 24 in Vancouver, Canada","year":2013,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Sustainable development; Grid; Work (physics); Electric utility","score_opus":0.006960139141704068,"score_gpt":0.1706800716892099,"score_spread":0.16371993254750583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019780134","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005323863,0.0026514262,0.002407997,0.022484053,0.006758513,0.00029156386,0.008640181,0.0016003563,0.94984204],"genre_scores_gemma":[0.0068531223,0.001028965,0.00034621864,0.00079226017,0.00027102596,0.000025539483,0.0025676147,0.0002480884,0.98786724],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990042,0.000046986628,0.000008891169,0.000052374497,0.0005539705,0.0003334847],"domain_scores_gemma":[0.99848145,0.000040290306,0.00002123472,0.00003814835,0.0006965628,0.0007224095],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009574667,0.0010260419,0.0005307316,0.0012958414,0.004738676,0.006118781,0.00089686236,0.0016569147,0.18012574],"category_scores_gemma":[0.0012102742,0.00028395292,0.00037587012,0.0018704828,0.00094764295,0.0015652581,0.0024267433,0.0023947274,0.05731656],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003164509,0.000037468748,0.0004068275,0.000027567557,0.0000028693444,0.00007040542,0.000072446346,0.00019422568,0.00020056409,0.0017576623,0.983573,0.01362522],"study_design_scores_gemma":[0.00000770571,0.000008781987,0.0021138801,0.000036833055,0.0000023168268,0.000012487698,0.00026842338,0.00029687714,0.00025942404,0.00062376144,0.99636096,0.000008534912],"about_ca_topic_score_codex":0.60706383,"about_ca_topic_score_gemma":0.91981876,"teacher_disagreement_score":0.8198743,"about_ca_system_score_codex":0.008478646,"about_ca_system_score_gemma":0.021536304,"threshold_uncertainty_score":0.7905005},"labels":[],"label_agreement":null},{"id":"W7024254717","doi":"","title":"Reaction mechanisms of the O2 reduction/evolution reaction","year":2003,"lang":"en","type":"other","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reaction mechanism; Mechanism (biology); Oxygen; Reactivity (psychology); Chemical reaction; Reaction conditions","score_opus":0.00618955429425034,"score_gpt":0.177743562969174,"score_spread":0.17155400867492368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024254717","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04936087,0.0035215549,0.013292142,0.0056495857,0.0047894306,0.0009995686,0.003013776,0.0016468584,0.9177262],"genre_scores_gemma":[0.23162153,0.004156944,0.0075325374,0.00068956264,0.00068240537,0.0002447726,0.0041113906,0.00074673566,0.75021416],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984137,0.00015203848,0.000051757797,0.0002653483,0.0009623563,0.00015471606],"domain_scores_gemma":[0.99808025,0.00029555583,0.0001324513,0.00029149526,0.0010485031,0.00015186412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010865622,0.00066725246,0.00061386405,0.0012547785,0.0015158982,0.0019081234,0.0017244812,0.0015077817,0.14328562],"category_scores_gemma":[0.0038685473,0.00031446974,0.0006445325,0.00068403734,0.0005098571,0.0016503424,0.00094798696,0.0009016005,0.04390912],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016737992,0.0005579466,0.0068421676,0.0030257269,0.00010064233,0.001962433,0.0005411885,0.0034466845,0.11050419,0.071019456,0.39597085,0.40435493],"study_design_scores_gemma":[0.00021957871,0.00029319478,0.010065633,0.00013563196,0.000061796665,0.0008148098,0.00030127703,0.008359327,0.17949481,0.014093879,0.78606844,0.00009166742],"about_ca_topic_score_codex":0.004564673,"about_ca_topic_score_gemma":0.0057628527,"teacher_disagreement_score":0.14328562,"about_ca_system_score_codex":0.0012519235,"about_ca_system_score_gemma":0.0016015094,"threshold_uncertainty_score":0.47933817},"labels":[],"label_agreement":null},{"id":"W7024592710","doi":"","title":"$530,000.00 in Sales Expected for Ideal Power Inc (IPWR) This Quarter","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Ideal (ethics); Power (physics); Measure (data warehouse)","score_opus":0.009052250526501186,"score_gpt":0.21986699313234678,"score_spread":0.2108147426058456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024592710","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005890708,0.00026561428,0.0004723428,0.00074236677,0.0011608622,0.00006362668,0.002594105,0.0017274879,0.99238443],"genre_scores_gemma":[0.001073231,0.00020197507,0.00010524246,0.00019970177,0.00013086286,0.0000149125835,0.00182731,0.0002779309,0.9961688],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996797,0.000017021339,0.000010283812,0.000049692357,0.00019451133,0.000048853275],"domain_scores_gemma":[0.9993513,0.000041398354,0.000023552086,0.000046507706,0.00023526055,0.00030192125],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00032506403,0.0010403993,0.00050167757,0.001519988,0.001053079,0.003186734,0.0007090907,0.0009724818,0.8183216],"category_scores_gemma":[0.0012054547,0.0003944709,0.00054201036,0.001031852,0.0005034661,0.0022851045,0.0018838663,0.0013313651,0.8139222],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027548836,0.000032699518,0.00011550632,0.00003615743,0.0000012880943,0.000013449144,0.000009975911,0.00008072658,0.00023674694,0.0006774061,0.96522784,0.033540584],"study_design_scores_gemma":[0.00001709713,0.000031789,0.00077929534,0.00006555125,0.0000022645297,0.000031101186,0.000056352106,0.0002188393,0.00014764428,0.00046774469,0.99817526,0.0000069643156],"about_ca_topic_score_codex":0.0070968717,"about_ca_topic_score_gemma":0.015070242,"teacher_disagreement_score":0.8183216,"about_ca_system_score_codex":0.00068537117,"about_ca_system_score_gemma":0.001177934,"threshold_uncertainty_score":0.25914216},"labels":[],"label_agreement":null},{"id":"W7024794331","doi":"","title":"Six Natural Resource Projects in Canada That Got it Right in 2017","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Natural resource; Resource (disambiguation); Government (linguistics); Natural (archaeology); Production (economics)","score_opus":0.009008714425738674,"score_gpt":0.18420793835411675,"score_spread":0.17519922392837808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024794331","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14807793,0.0019435993,0.0031814799,0.015397953,0.0009189546,0.00064646726,0.021326825,0.0011069153,0.8073998],"genre_scores_gemma":[0.21140909,0.0015869128,0.0032978985,0.0021288192,0.000056210683,0.00016497105,0.008182894,0.00029001044,0.7728832],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979971,0.00006870144,0.000027279684,0.000077771525,0.0008783475,0.0009508375],"domain_scores_gemma":[0.9967456,0.00006623464,0.00007058135,0.00007515905,0.0017628394,0.0012796024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083375734,0.00052575994,0.00031565412,0.0015923604,0.010730433,0.0035207693,0.0009324832,0.0012061271,0.01609798],"category_scores_gemma":[0.0022385558,0.0003326458,0.00044038688,0.0026722488,0.0011596147,0.0009340144,0.0022793445,0.0019843765,0.0025517656],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033413336,0.000271009,0.04713308,0.00035365304,0.000059436275,0.0014043272,0.004885178,0.0015661309,0.0018757454,0.052595057,0.7267017,0.16282055],"study_design_scores_gemma":[0.000018967785,0.000020381567,0.05371896,0.00009355139,0.00001581062,0.000105206935,0.006152468,0.00041098677,0.00089902524,0.0011801212,0.9373529,0.0000316236],"about_ca_topic_score_codex":0.9831887,"about_ca_topic_score_gemma":0.9965006,"teacher_disagreement_score":0.038842555,"about_ca_system_score_codex":0.038842555,"about_ca_system_score_gemma":0.14152935,"threshold_uncertainty_score":0.2818238},"labels":[],"label_agreement":null},{"id":"W7026712169","doi":"","title":"BluWave-ai Deploys First Ever Automated Real-time AI Energy Dispatch in a Canadian Electrical Utility, Powered by Microsoft Azure","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Automation; Electric energy; Energy consumption; Electricity","score_opus":0.002420968379302536,"score_gpt":0.18669573804550552,"score_spread":0.184274769666203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7026712169","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14853221,0.0006178055,0.07723093,0.006967827,0.001457267,0.0010759091,0.011848587,0.09786778,0.6544018],"genre_scores_gemma":[0.6916433,0.00048114467,0.045902066,0.0007777377,0.00013481257,0.0001296539,0.014082942,0.0033642675,0.24348412],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957854,0.000028118033,0.000006195839,0.00006229097,0.00020944339,0.000115409995],"domain_scores_gemma":[0.99945563,0.00005768852,0.000012837871,0.00005350414,0.00025960864,0.00016064188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068741635,0.00078162784,0.0003282746,0.0008789937,0.0012850325,0.0013138452,0.00079441274,0.00040665138,0.032683466],"category_scores_gemma":[0.0012985311,0.000286413,0.00022340145,0.0006998355,0.000553392,0.0010276384,0.0009664094,0.0011003944,0.0070533715],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011243989,0.00046237878,0.007731445,0.0001373721,0.00008010742,0.00057749613,0.0004351568,0.025086889,0.022799559,0.010178001,0.7208071,0.21058017],"study_design_scores_gemma":[0.00040032266,0.00040158164,0.013903197,0.000049851897,0.000044532946,0.00013121456,0.0010623136,0.400452,0.01533544,0.0043311464,0.5637805,0.00010793199],"about_ca_topic_score_codex":0.48026973,"about_ca_topic_score_gemma":0.6648005,"teacher_disagreement_score":0.48026973,"about_ca_system_score_codex":0.0034912326,"about_ca_system_score_gemma":0.0050906185,"threshold_uncertainty_score":0.9549485},"labels":[],"label_agreement":null},{"id":"W7027702422","doi":"","title":"Demand side management for the future smart grid","year":2015,"lang":"en","type":"other","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Power grid; Nucleofection; Work (physics); Filter (signal processing); Production (economics); Focus (optics)","score_opus":0.005285106904134186,"score_gpt":0.1523199190272967,"score_spread":0.1470348121231625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027702422","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029020224,0.0004305358,0.9526266,0.0015718022,0.00015081631,0.000098930774,0.0001822587,0.00090602133,0.0150128035],"genre_scores_gemma":[0.79405046,0.00081703987,0.19426543,0.00040387202,0.00012357689,0.00016980238,0.0003700826,0.0002184806,0.0095812455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997516,0.00010904309,0.000011853511,0.000034387438,0.000074249525,0.000018872002],"domain_scores_gemma":[0.9996202,0.00016756648,0.000031998927,0.00007238644,0.00008499318,0.000022756802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007438783,0.0003709267,0.00039716123,0.00014471327,0.00030045933,0.0010066183,0.0006688037,0.00066612655,0.004140282],"category_scores_gemma":[0.0010100992,0.0001891122,0.00033552793,0.00032134372,0.00028750848,0.0013885252,0.00048151726,0.0009896457,0.0006048085],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009170715,0.00008872869,0.0006634489,0.00010521048,0.000023289833,0.00008257475,0.00010024807,0.7819304,0.0048127472,0.13043399,0.007726304,0.07394121],"study_design_scores_gemma":[0.000009575103,0.000018837807,0.000080324804,0.0000057313396,0.0000038366525,0.000015175833,0.000013363064,0.9715902,0.00066439074,0.021708416,0.0058838944,0.0000061405494],"about_ca_topic_score_codex":0.0014292955,"about_ca_topic_score_gemma":0.0019982487,"teacher_disagreement_score":0.004140282,"about_ca_system_score_codex":0.0007284363,"about_ca_system_score_gemma":0.00079120684,"threshold_uncertainty_score":0.013850629},"labels":[],"label_agreement":null},{"id":"W7030136537","doi":"","title":"Maxim Power Corp. Announces 2016 First Quarter Financial and Operating Results - Energy (ENERGY01) News","year":2016,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maxim; Quarter (Canadian coin); Power (physics); Energy (signal processing); Electric energy","score_opus":0.004690209428985653,"score_gpt":0.1792979899735063,"score_spread":0.17460778054452064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030136537","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014813449,0.00077186356,0.0014759658,0.02893831,0.010753709,0.000078188794,0.0052071633,0.002255564,0.94903785],"genre_scores_gemma":[0.0057364944,0.00038083954,0.00036112533,0.0036490944,0.0011502514,0.000027513146,0.002091819,0.0005802318,0.9860227],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985758,0.00008702076,0.000032771444,0.00009337461,0.0009845127,0.00022662058],"domain_scores_gemma":[0.9984865,0.00023662868,0.00007180163,0.00013107993,0.00077338377,0.000300643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012826426,0.00073138735,0.00041241324,0.000993901,0.0023671754,0.0066197286,0.00072786555,0.0034594843,0.28088826],"category_scores_gemma":[0.004505269,0.00044627918,0.0006150039,0.0010247559,0.0006382847,0.0031444782,0.0015056366,0.0043308153,0.1728675],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032891923,0.00001751755,0.00009710099,0.000016332793,0.0000011206084,0.000046057146,0.0000123177215,0.000045039986,0.00011927325,0.0029340324,0.98825026,0.008428102],"study_design_scores_gemma":[0.0000129039145,0.000019556075,0.0005099598,0.000025032145,0.0000025234742,0.00004280623,0.00004871907,0.00028416837,0.00059332675,0.001454372,0.99699914,0.0000074121303],"about_ca_topic_score_codex":0.006095984,"about_ca_topic_score_gemma":0.019326136,"teacher_disagreement_score":0.28088826,"about_ca_system_score_codex":0.0012795402,"about_ca_system_score_gemma":0.0017271454,"threshold_uncertainty_score":0.93966484},"labels":[],"label_agreement":null},{"id":"W7033434657","doi":"","title":"Portland General Electric Announces Second Quarter 2021 Results","year":2021,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Square (algebra)","score_opus":0.00541774029155144,"score_gpt":0.1858958635647787,"score_spread":0.18047812327322726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033434657","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003274773,0.000372642,0.0021014507,0.02021338,0.01097777,0.0004232396,0.03681252,0.0029777477,0.92284656],"genre_scores_gemma":[0.0046024807,0.00011864935,0.00059126224,0.005959445,0.00035216686,0.00010289821,0.008659996,0.0003715569,0.97924155],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977418,0.0001581077,0.000031210664,0.00010255682,0.0015778362,0.0003885232],"domain_scores_gemma":[0.9975648,0.00031313684,0.00005897065,0.0001435737,0.0012472966,0.00067223294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028067345,0.001528668,0.000701969,0.001323807,0.002209955,0.0062482366,0.0016139323,0.006051519,0.28694296],"category_scores_gemma":[0.0042943163,0.00048634043,0.0011355863,0.00083380495,0.00074136566,0.0016972738,0.0013044177,0.003699406,0.17135468],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055840042,0.000058878017,0.00013197504,0.000017214934,0.0000023036623,0.000030541814,0.000004579073,0.00013608794,0.000110159446,0.0011779536,0.99365544,0.0046190424],"study_design_scores_gemma":[0.00008358615,0.00006440135,0.002196748,0.00003503171,0.000010765543,0.000025699503,0.00007072983,0.0008260667,0.00054054765,0.0019450354,0.9941801,0.00002122646],"about_ca_topic_score_codex":0.066046454,"about_ca_topic_score_gemma":0.16279924,"teacher_disagreement_score":0.28694296,"about_ca_system_score_codex":0.003372927,"about_ca_system_score_gemma":0.0062732548,"threshold_uncertainty_score":0.9599198},"labels":[],"label_agreement":null},{"id":"W7034556726","doi":"","title":"Track Group Reports 2nd Quarter Fiscal 2018 Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Track (disk drive); Group (periodic table); Fiscal year; Tracking (education)","score_opus":0.006291238934231908,"score_gpt":0.18713025231820185,"score_spread":0.18083901338396993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7034556726","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016676916,0.0005181156,0.0009953293,0.008665991,0.0075935745,0.00030572203,0.0573579,0.0032077534,0.9196879],"genre_scores_gemma":[0.0035378954,0.0003826877,0.00039687823,0.0012653745,0.0007877142,0.00015305572,0.027073367,0.0008954585,0.96550757],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99644744,0.00021640991,0.000115372495,0.00022742395,0.0023726616,0.00062066934],"domain_scores_gemma":[0.99305624,0.00037763812,0.00030332472,0.00044803272,0.0044931835,0.0013216689],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0036929038,0.0015862732,0.0009484297,0.0044017676,0.0030716876,0.009940965,0.0019690993,0.0030889225,0.49858388],"category_scores_gemma":[0.00985675,0.0004616494,0.0008659835,0.0029278037,0.0006639577,0.004114028,0.0022191533,0.002644075,0.48320428],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004117619,0.000029572462,0.00011456094,0.000013177216,0.0000012671878,0.000009304572,0.0000039828556,0.000034845776,0.000024812049,0.00097636326,0.99330693,0.005444035],"study_design_scores_gemma":[0.00005854895,0.00003640171,0.0010472535,0.00004784974,0.000005392838,0.0000150975675,0.000046809862,0.00028178937,0.0003123047,0.0013356005,0.9968009,0.000012144085],"about_ca_topic_score_codex":0.023265421,"about_ca_topic_score_gemma":0.031701244,"teacher_disagreement_score":0.49858388,"about_ca_system_score_codex":0.0035907165,"about_ca_system_score_gemma":0.008163423,"threshold_uncertainty_score":0.71520925},"labels":[],"label_agreement":null},{"id":"W7036907979","doi":"","title":"DP World Selects TYCROP and Loop Energy for Solution to Decarbonize RTG Cranes at Port of Vancouver","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Energy (signal processing); Control theory (sociology); Loop (graph theory); Energy consumption; Efficient energy use","score_opus":0.007472249235586778,"score_gpt":0.1940874686367784,"score_spread":0.1866152194011916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7036907979","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004096534,0.00026342968,0.00079207885,0.0045591816,0.0010846177,0.000132541,0.0018798914,0.00057013356,0.9866216],"genre_scores_gemma":[0.005381207,0.00013815009,0.00022791722,0.00053830753,0.00003273713,0.000009537356,0.00041430703,0.00014131755,0.9931164],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947804,0.000019369258,0.0000050334534,0.00003764772,0.0002909727,0.00016894934],"domain_scores_gemma":[0.9989512,0.000044778222,0.000011944088,0.000035967896,0.0005514283,0.00040466432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048231383,0.0005252363,0.00025220646,0.001158558,0.0030599819,0.0032507295,0.00054312195,0.0016745398,0.2656626],"category_scores_gemma":[0.00092366803,0.00028831768,0.00031553136,0.00078100205,0.00047201812,0.00065326935,0.0008636576,0.0018040712,0.050165128],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005133386,0.00006862577,0.001575573,0.000053790907,0.0000056563103,0.00031987656,0.000084792366,0.00024171482,0.0011558533,0.006375918,0.9454665,0.044600453],"study_design_scores_gemma":[0.000008292923,0.000018295403,0.0013145985,0.00002534664,0.0000024454243,0.000041341107,0.00018200846,0.00023661373,0.00044991582,0.0003127021,0.9974032,0.0000052213995],"about_ca_topic_score_codex":0.3477458,"about_ca_topic_score_gemma":0.80080944,"teacher_disagreement_score":0.6522542,"about_ca_system_score_codex":0.004011259,"about_ca_system_score_gemma":0.010039125,"threshold_uncertainty_score":0.88873},"labels":[],"label_agreement":null},{"id":"W7037839128","doi":"","title":"First Nations fathering: A model to support the early formation of Aboriginal and Torres Strait Islander male-led families","year":2022,"lang":"en","type":"other","venue":"Minerva Access (University of Melbourne)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Gestational period; TSG101; Liquation; Dysgeusia; Diafiltration; Emperipolesis; Triacetin; Durvalumab","score_opus":0.014955806884416573,"score_gpt":0.2166205528332328,"score_spread":0.20166474594881623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7037839128","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2806653,0.00073799974,0.006530915,0.09458285,0.001692299,0.00029523775,0.00012510229,0.00021464504,0.61515564],"genre_scores_gemma":[0.6866506,0.00072684657,0.0060913796,0.005332646,0.000157161,0.0002006349,0.00007539036,0.00011455121,0.30065072],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99880195,0.0005786865,0.000008994694,0.000057633148,0.00009398331,0.00045872858],"domain_scores_gemma":[0.9963838,0.00034186288,0.00013940451,0.00015061467,0.00035258324,0.0026317877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021757933,0.0002572175,0.00010326654,0.000309742,0.011310688,0.002687901,0.00088331307,0.0011161296,0.023201006],"category_scores_gemma":[0.0033412774,0.0001486507,0.00015634569,0.00025769667,0.0020512745,0.0015990554,0.003513573,0.0026451743,0.002040538],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012953028,0.0008212856,0.032869216,0.000116562405,0.000014063938,0.0042761546,0.27025083,0.0004206867,0.0015493861,0.28792074,0.1879415,0.21369015],"study_design_scores_gemma":[0.000046064208,0.0003275296,0.015911072,0.00033142645,0.000015702435,0.0014356843,0.22110096,0.00075461564,0.0010501357,0.01288983,0.7460998,0.00003715804],"about_ca_topic_score_codex":0.04158195,"about_ca_topic_score_gemma":0.16912287,"teacher_disagreement_score":0.04158195,"about_ca_system_score_codex":0.0021726133,"about_ca_system_score_gemma":0.013405716,"threshold_uncertainty_score":0.08267987},"labels":[],"label_agreement":null},{"id":"W7042047636","doi":"","title":"Ontario’s New 4-Year Plan Paves Way for Grid Flexibility &amp;amp; Renewable Microgrids","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Plan (archaeology); Grid; Renewable energy; Key (lock)","score_opus":0.041501845805143996,"score_gpt":0.24891188621902863,"score_spread":0.20741004041388464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042047636","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077512,0.0006005443,0.0020904243,0.03064967,0.0014802562,0.00024646526,0.009364255,0.0008970308,0.9469201],"genre_scores_gemma":[0.014935559,0.00032991346,0.00133829,0.0022330086,0.000085655905,0.000040264982,0.0015085335,0.0001629294,0.9793658],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99874866,0.000041425425,0.000018142566,0.000042908876,0.0007726692,0.00037620476],"domain_scores_gemma":[0.9975446,0.00006909215,0.000062698105,0.00010423235,0.0013285208,0.0008908747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006558551,0.000552976,0.00026745402,0.0009896269,0.0058311387,0.0042466754,0.00089046516,0.0027666443,0.16430184],"category_scores_gemma":[0.0015477048,0.00043453957,0.00069794065,0.001226677,0.0011646037,0.0012793624,0.0019262468,0.001494648,0.029945908],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054438566,0.00004395463,0.0015004203,0.0000811636,0.000008103633,0.00019844931,0.00019269287,0.00042810288,0.00064443896,0.012448498,0.9552555,0.029144315],"study_design_scores_gemma":[0.00001509624,0.000008892794,0.0028211426,0.000027786526,0.0000035151745,0.000031010764,0.00019421232,0.00029629888,0.00021108043,0.0009277602,0.9954536,0.000009450932],"about_ca_topic_score_codex":0.91895187,"about_ca_topic_score_gemma":0.9827083,"teacher_disagreement_score":0.16430184,"about_ca_system_score_codex":0.026622143,"about_ca_system_score_gemma":0.081736304,"threshold_uncertainty_score":0.5496444},"labels":[],"label_agreement":null},{"id":"W7042280928","doi":"","title":"Ontario chooses Energate for Smart Grid consumer engagement","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Customer engagement; Smart grid; Key (lock); Set (abstract data type); Context (archaeology)","score_opus":0.019609721445051298,"score_gpt":0.20581240555857463,"score_spread":0.18620268411352334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042280928","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061249253,0.00018814609,0.0003683381,0.006199991,0.00017193404,0.00018195427,0.0049579446,0.00021070862,0.98159605],"genre_scores_gemma":[0.011786135,0.00015538001,0.00022941983,0.0011008576,0.000032600026,0.00004750596,0.0009133343,0.00011256221,0.9856222],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99834895,0.00006634081,0.00002485679,0.00007499232,0.0008634791,0.00062140235],"domain_scores_gemma":[0.9969278,0.00017737209,0.00007632811,0.00013103192,0.0014977807,0.0011897704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007342072,0.00042227114,0.0003048643,0.0011841197,0.009871416,0.004669092,0.0008238676,0.0029467482,0.21537383],"category_scores_gemma":[0.0026333618,0.0005601168,0.0005608294,0.0018350562,0.0010150602,0.001427952,0.0017532979,0.0018630151,0.036521625],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072885865,0.00006641095,0.004472768,0.000059419213,0.0000059013264,0.00025772455,0.0003884565,0.000120229466,0.0002705145,0.013064956,0.95909804,0.022122674],"study_design_scores_gemma":[0.000019355219,0.00001330719,0.00925738,0.00003121429,0.000004986709,0.000047052046,0.0008082272,0.00014664407,0.00020018482,0.00066850666,0.98879015,0.000012910249],"about_ca_topic_score_codex":0.90719247,"about_ca_topic_score_gemma":0.9860693,"teacher_disagreement_score":0.21537383,"about_ca_system_score_codex":0.021883812,"about_ca_system_score_gemma":0.061607115,"threshold_uncertainty_score":0.72049725},"labels":[],"label_agreement":null},{"id":"W7043316312","doi":"","title":"Remote energy auditing: energy efficiency through smart thermostat data and control","year":2017,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Thermostat; Efficient energy use; Occupancy; Energy (signal processing); Audit; Control (management); Variety (cybernetics); Smart meter; Electricity meter","score_opus":0.020277562660423364,"score_gpt":0.23196234655760345,"score_spread":0.2116847838971801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043316312","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7293803,0.00048093984,0.21672292,0.00068878185,0.000062655505,0.0024571982,0.008412013,0.004300941,0.037494324],"genre_scores_gemma":[0.93037224,0.00010026581,0.06495553,0.00006314236,0.0000144464775,0.0002605973,0.0016440408,0.000076527256,0.0025133598],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99799985,0.0006944712,0.00012697917,0.0003157253,0.0007070034,0.00015597002],"domain_scores_gemma":[0.9943678,0.0015726752,0.0011200407,0.0013160477,0.0015026155,0.00012079043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023149224,0.00040525204,0.00039698975,0.0013674475,0.0004423825,0.0010935497,0.00078351045,0.00030053584,0.0028107706],"category_scores_gemma":[0.008677134,0.00025566886,0.00020599268,0.0020511984,0.00051556365,0.0008857977,0.0006954508,0.00040631136,0.00062021357],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050031,0.0006021277,0.42698818,0.00043849694,0.00011479442,0.00028117246,0.0023031142,0.031951275,0.017269865,0.0029739663,0.005820842,0.5107559],"study_design_scores_gemma":[0.00013094633,0.0005498213,0.7056915,0.00020133496,0.00009326913,0.0003911912,0.002204207,0.2266256,0.032383405,0.0033847257,0.028180826,0.00016313964],"about_ca_topic_score_codex":0.12836398,"about_ca_topic_score_gemma":0.21375194,"teacher_disagreement_score":0.12836398,"about_ca_system_score_codex":0.0012201233,"about_ca_system_score_gemma":0.0019102887,"threshold_uncertainty_score":0.2552336},"labels":[],"label_agreement":null},{"id":"W7046034331","doi":"","title":"Chesapeake Utilities Corporation Reports Second Quarter 2020 Results","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Corporation; Corporate governance","score_opus":0.008296943059635365,"score_gpt":0.1745231706623019,"score_spread":0.16622622760266656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7046034331","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058825808,0.0007759006,0.0017228734,0.006767852,0.0041539907,0.0003522349,0.094890706,0.0020822976,0.88337153],"genre_scores_gemma":[0.010216753,0.00035082983,0.0010516412,0.0022427663,0.00018822907,0.00010943522,0.039732113,0.0003160187,0.9457924],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982541,0.00010942198,0.000030071107,0.00009202584,0.001284143,0.00023015491],"domain_scores_gemma":[0.9964432,0.00020760804,0.000079769045,0.000115532544,0.0025072289,0.0006466647],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0020220052,0.0014329726,0.00039840216,0.0019806263,0.0013485625,0.004432957,0.0010863639,0.001705992,0.22099584],"category_scores_gemma":[0.00316287,0.00031471447,0.0007716542,0.0011574869,0.00040097898,0.0014532087,0.000907506,0.0014894635,0.12151581],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071210394,0.0000555184,0.00034891663,0.000026203761,0.0000029727357,0.000018989462,0.0000051920492,0.00021705074,0.00013512184,0.000749229,0.98677087,0.011598814],"study_design_scores_gemma":[0.00008746085,0.00007692571,0.0049857325,0.00004579124,0.000017943157,0.00002541613,0.000080430385,0.0011472931,0.0011478015,0.0010178176,0.9913489,0.000018585084],"about_ca_topic_score_codex":0.13490012,"about_ca_topic_score_gemma":0.19835256,"teacher_disagreement_score":0.77900416,"about_ca_system_score_codex":0.003947941,"about_ca_system_score_gemma":0.0060587795,"threshold_uncertainty_score":0.7393048},"labels":[],"label_agreement":null},{"id":"W7066856389","doi":"","title":"Impact of energy recovery technology on housing performance","year":2008,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy recovery; Energy (signal processing); Production (economics); Energy consumption; Heat recovery ventilation; Efficient energy use","score_opus":0.009029316125571892,"score_gpt":0.19335136669593556,"score_spread":0.18432205057036366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066856389","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94602937,0.00030542593,0.0010864865,0.0009874721,0.00036092146,0.00008378349,0.0007885532,0.0002223335,0.05013573],"genre_scores_gemma":[0.96968853,0.00017849385,0.000511724,0.000048808957,0.0000607468,0.000008721537,0.0007497921,0.000054715805,0.0286984],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989838,0.00018269544,0.000037315836,0.000070673756,0.0005650284,0.0001605111],"domain_scores_gemma":[0.9960008,0.0007512696,0.0002267768,0.00023821188,0.00253382,0.0002490385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009335855,0.00023988029,0.00038992212,0.0004764541,0.000610165,0.0010048313,0.0004784908,0.00054344273,0.04896585],"category_scores_gemma":[0.004782216,0.000084635314,0.00031005425,0.00033034006,0.00030618618,0.0006656725,0.0005066625,0.00023165152,0.008922319],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009536425,0.0027834598,0.115848474,0.0010274121,0.0002994698,0.0018966339,0.00072962575,0.021147713,0.09203308,0.0040932163,0.07805194,0.67255247],"study_design_scores_gemma":[0.00041093954,0.009584287,0.66353106,0.00018242672,0.00035402545,0.0011247621,0.005252117,0.03335939,0.21202123,0.0024027373,0.071595475,0.00018147565],"about_ca_topic_score_codex":0.0038455476,"about_ca_topic_score_gemma":0.006003911,"teacher_disagreement_score":0.04896585,"about_ca_system_score_codex":0.00045331102,"about_ca_system_score_gemma":0.0007514306,"threshold_uncertainty_score":0.16380703},"labels":[],"label_agreement":null},{"id":"W7067814802","doi":"","title":"North American Clean Energy - Schneider Electric Smart Grid Lab at Ryerson University's Centre for Urban Energy Officially Open","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Clean energy; Energy (signal processing); Electric energy; Electricity; Smart grid; Renewable energy; Efficient energy use","score_opus":0.00781437593587242,"score_gpt":0.17952172311689715,"score_spread":0.17170734718102473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7067814802","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017588189,0.00015713969,0.00088704325,0.0017989412,0.00026512198,0.00010154218,0.005893711,0.0020016278,0.9871361],"genre_scores_gemma":[0.002500893,0.00009017453,0.00034756312,0.00022910516,0.0000272206,0.000031775675,0.0020404172,0.00043168286,0.9943011],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989485,0.000057844587,0.000020322368,0.00010028026,0.0006616746,0.00021145194],"domain_scores_gemma":[0.9971866,0.0002389007,0.00008281707,0.00043934467,0.0014983502,0.0005538744],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008934073,0.0009403197,0.0005577185,0.0020267814,0.004300464,0.00503711,0.0011474206,0.0027173827,0.44677985],"category_scores_gemma":[0.0027500861,0.00063655485,0.00047582528,0.0018856745,0.0010419755,0.0024148512,0.0016794916,0.0029036233,0.3040997],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042243217,0.0001332339,0.00052827015,0.00003688326,0.0000027311476,0.00005363321,0.0000534043,0.00010801677,0.00029553767,0.010434249,0.9570652,0.03124658],"study_design_scores_gemma":[0.000018212275,0.00001724524,0.0025609944,0.000040256775,0.0000036706801,0.00003628516,0.00012923265,0.00043949453,0.00086370314,0.0019724118,0.9939069,0.000011608333],"about_ca_topic_score_codex":0.086328626,"about_ca_topic_score_gemma":0.21137147,"teacher_disagreement_score":0.9136714,"about_ca_system_score_codex":0.0035304923,"about_ca_system_score_gemma":0.009966989,"threshold_uncertainty_score":0.78910136},"labels":[],"label_agreement":null},{"id":"W7071096418","doi":"","title":"Schneider Electric Smart Grid Lab at Ryerson University's Centre for Urban Energy officially open, available for testing and training - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Training (meteorology); Energy (signal processing); Smart grid; Electricity; Electric energy; Efficient energy use","score_opus":0.028882940833146343,"score_gpt":0.19422985072684387,"score_spread":0.16534690989369752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071096418","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00093986955,0.0003276571,0.0010941289,0.0070707826,0.0019886347,0.000083328676,0.004922261,0.004027721,0.9795456],"genre_scores_gemma":[0.0017671798,0.00012392277,0.00017354007,0.0005321366,0.0001207802,0.000017330349,0.0013986285,0.0005080833,0.9953584],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990227,0.000050333754,0.000015488082,0.00007401864,0.00066196016,0.00017557503],"domain_scores_gemma":[0.9985759,0.00014754754,0.000034475182,0.00019506409,0.0006697104,0.00037716885],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009801114,0.0009696841,0.00047211986,0.001101746,0.0027986132,0.0056411223,0.0008630711,0.0029740187,0.4486972],"category_scores_gemma":[0.0020883062,0.0006481061,0.0006019647,0.0006648844,0.0007815143,0.0027459292,0.001411557,0.0033219573,0.33893365],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030137337,0.000030465466,0.00012589661,0.000014128319,0.0000011776187,0.00003100549,0.000014478764,0.000034133995,0.00013111815,0.0015936579,0.9853677,0.012626057],"study_design_scores_gemma":[0.000014177219,0.000016132155,0.000821592,0.000020352152,0.0000021026444,0.000021439324,0.0000637609,0.00016553042,0.00043096914,0.0006447166,0.99779236,0.0000069258585],"about_ca_topic_score_codex":0.030942494,"about_ca_topic_score_gemma":0.106402054,"teacher_disagreement_score":0.4486972,"about_ca_system_score_codex":0.0018185576,"about_ca_system_score_gemma":0.0031204773,"threshold_uncertainty_score":0.7863665},"labels":[],"label_agreement":null},{"id":"W7083851493","doi":"","title":"Asteroids are smacking Earth twice as often as before","year":2019,"lang":"en","type":"other","venue":"Internet Archive (Internet Archive)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asteroid; Near-Earth object; Impact crater; Falling (accident); Earth (classical element)","score_opus":0.007739262025604555,"score_gpt":0.20742090095625326,"score_spread":0.19968163893064872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7083851493","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018539602,0.0018311117,0.001160754,0.013060986,0.0027173886,0.00007547491,0.042582907,0.0044636354,0.9155682],"genre_scores_gemma":[0.076061636,0.006426736,0.0017932148,0.0050884923,0.0013593584,0.0000995006,0.047119208,0.0013432133,0.8607087],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994363,0.00006688098,0.000029068387,0.000072035305,0.00031207266,0.00008359294],"domain_scores_gemma":[0.99830294,0.00021526376,0.00037691364,0.00024285528,0.0005399376,0.0003220886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040621395,0.0005296791,0.00027318485,0.0023088064,0.001446314,0.0030643882,0.00056909776,0.0009563317,0.2835652],"category_scores_gemma":[0.0032055154,0.0002433493,0.0004093588,0.005193269,0.00056314905,0.002613689,0.0018090938,0.00071420876,0.14880963],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065341366,0.000039309856,0.0047872127,0.00018455592,0.000016012391,0.000069098205,0.00029781257,0.00004784974,0.00034152748,0.0019026479,0.90396255,0.08828607],"study_design_scores_gemma":[0.000014015097,0.000022004035,0.011196819,0.00007738178,0.000011245391,0.00012874113,0.00085500313,0.000046558696,0.00037244774,0.0011221968,0.98614234,0.000011178403],"about_ca_topic_score_codex":0.0067544077,"about_ca_topic_score_gemma":0.015714584,"teacher_disagreement_score":0.2835652,"about_ca_system_score_codex":0.00073249533,"about_ca_system_score_gemma":0.00070350437,"threshold_uncertainty_score":0.9486201},"labels":[],"label_agreement":null},{"id":"W7084390676","doi":"10.1007/978-3-031-95288-3_29","title":"Development of a Screw-Glued Timber-to-Timber Connection for Use in the Manufacturing of Mass Timber Composite Panels","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Clamping; Adhesive; Stiffness; Connection (principal bundle); Composite number; Shear (geology); Ductility (Earth science); Failure mechanism","score_opus":0.015057525170131624,"score_gpt":0.20546450009616693,"score_spread":0.1904069749260353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084390676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33911487,0.0025507018,0.5772765,0.000316839,0.0017913677,0.000594999,0.0009273015,0.003692422,0.073735006],"genre_scores_gemma":[0.4951668,0.0014836646,0.4550542,0.0001576062,0.000101379774,0.00023027226,0.00096709543,0.0004902202,0.046348784],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996731,0.00001793233,0.000015509873,0.000051643652,0.00021693784,0.000024907855],"domain_scores_gemma":[0.99974936,0.000024494673,0.000032997985,0.000037726593,0.00012060415,0.000034779638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033161454,0.00045444045,0.00028239275,0.00073873193,0.00038132427,0.00045907786,0.0010877211,0.0006868401,0.005284614],"category_scores_gemma":[0.000471979,0.00040274582,0.00048009882,0.0006376338,0.00026732043,0.0007078325,0.00045004307,0.0009254051,0.002373307],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055754717,0.00016833497,0.0005398169,0.00030108498,0.000017605982,0.0005258309,0.00013023942,0.003210097,0.89239436,0.0036906104,0.002895865,0.09607041],"study_design_scores_gemma":[0.000043929896,0.0017783416,0.0068079364,0.00011489997,0.00006932531,0.0021920137,0.000109887136,0.028073823,0.85422266,0.0013779,0.105146594,0.00006280401],"about_ca_topic_score_codex":0.00043544662,"about_ca_topic_score_gemma":0.002018329,"teacher_disagreement_score":0.005284614,"about_ca_system_score_codex":0.00019076242,"about_ca_system_score_gemma":0.00050920283,"threshold_uncertainty_score":0.017678797},"labels":[],"label_agreement":null},{"id":"W7086977029","doi":"10.1109/access.2025.3620234","title":"Practical Method for Behind-the-Meter Solar PV Disaggregation","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University; Fraser Health","funders":"Agência Nacional de Energia Elétrica; Fundação de Amparo à Pesquisa do Estado do Rio Grande do Sul; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Photovoltaic system; Prosumer; Smart grid; Electricity generation; Probabilistic logic; Cluster analysis; Distributed generation; Energy consumption; Grid","score_opus":0.035302297875338944,"score_gpt":0.3703338004916926,"score_spread":0.33503150261635367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7086977029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0060036294,0.000044585027,0.9910035,0.000048553953,0.000035684076,0.00007310985,0.00026009924,0.0009732542,0.0015574666],"genre_scores_gemma":[0.2211361,0.00010409916,0.7735345,0.000090237,0.00005685556,0.00031272502,0.0012622304,0.0002774937,0.003225809],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993807,0.00014367809,0.000040978368,0.0001656994,0.0002286283,0.0000402638],"domain_scores_gemma":[0.99931395,0.0002386326,0.000057212532,0.000147669,0.00022375851,0.000018899342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000632977,0.0006698201,0.00053266116,0.0008034502,0.00039621035,0.0006957551,0.0007019065,0.000553977,0.005674951],"category_scores_gemma":[0.0030479247,0.00026268,0.00046931123,0.0010786508,0.00022753139,0.0006253574,0.00093683833,0.00077885156,0.0017817171],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002182281,0.0001701063,0.0058903727,0.00026732907,0.00009707998,0.00020870322,0.0003025517,0.33512503,0.027678609,0.01829525,0.011460968,0.6002857],"study_design_scores_gemma":[0.000022350621,0.000041763466,0.0016896535,0.000012996162,0.000009751793,0.00011329925,0.000055150915,0.97701573,0.004881022,0.007060381,0.0090751415,0.00002291452],"about_ca_topic_score_codex":0.0035635654,"about_ca_topic_score_gemma":0.005112514,"teacher_disagreement_score":0.005674951,"about_ca_system_score_codex":0.00032451536,"about_ca_system_score_gemma":0.000853249,"threshold_uncertainty_score":0.018984616},"labels":[],"label_agreement":null},{"id":"W7092362345","doi":"10.5281/zenodo.17382703","title":"Evaluating the Effectiveness of Muti-Sector Demand Response in Energy Planning Models (New England Networks)","year":2025,"lang":"","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Demand response; Energy demand; Demand forecasting; Energy (signal processing); New england; Raw data","score_opus":0.047909975397354906,"score_gpt":0.28177583889727836,"score_spread":0.23386586349992344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7092362345","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006609471,0.00018256818,0.00044817917,0.00032356466,0.00006786192,0.000042634536,0.9898705,0.00090179406,0.0015533584],"genre_scores_gemma":[0.008816771,0.00006962866,0.00096116186,0.00005696382,0.000010997151,0.000108459244,0.9890031,0.00006507893,0.0009077588],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991047,0.00031101942,0.000094137584,0.00020673613,0.0002098216,0.0000735317],"domain_scores_gemma":[0.9962243,0.0017569616,0.00023162682,0.00086982455,0.0007555942,0.00016183611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00207123,0.001488505,0.00088544167,0.0016704759,0.00046003656,0.0011842152,0.002703019,0.0016106042,0.016713055],"category_scores_gemma":[0.007913504,0.0004859429,0.0010478891,0.0022089027,0.00035063794,0.00094525603,0.0012409041,0.0012935066,0.009114016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034446226,0.00016789544,0.00536707,0.0012785249,0.00021365806,0.000098952376,0.00006620099,0.025915686,0.00029519838,0.0014468483,0.95578057,0.00902499],"study_design_scores_gemma":[0.0023409096,0.0003920366,0.061236393,0.001015018,0.0003391083,0.0002936196,0.0005798984,0.10775396,0.0031286096,0.0070012403,0.81571174,0.00020743394],"about_ca_topic_score_codex":0.05906504,"about_ca_topic_score_gemma":0.09800716,"teacher_disagreement_score":0.05906504,"about_ca_system_score_codex":0.0021236027,"about_ca_system_score_gemma":0.001093831,"threshold_uncertainty_score":0.11744249},"labels":[],"label_agreement":null},{"id":"W7096361348","doi":"","title":"SMART GRIDS AND THE CANADIAN RESIDENTIAL CONSUMER: ISSUES AND PROSPECTS SMART GRIDS AND THE CANADIAN RESIDENTIAL CONSUMER:","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Software; Grid; Enthusiasm; Key (lock)","score_opus":0.007258425118049049,"score_gpt":0.1996222891787073,"score_spread":0.19236386406065825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096361348","genre_codex":"commentary","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018344266,0.047712337,0.00043647128,0.82054275,0.0015614041,0.00003752324,0.0006282699,0.000047667952,0.11068939],"genre_scores_gemma":[0.4735738,0.21982512,0.0035282804,0.152996,0.002793696,0.00006828096,0.00078654685,0.00008962875,0.14633861],"study_design_codex":"not_applicable","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9978694,0.00021553235,0.00003185937,0.0001282869,0.0008854524,0.0008694295],"domain_scores_gemma":[0.9948008,0.00038531833,0.00014058992,0.00004579778,0.0029034128,0.0017240418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022693207,0.00040150632,0.0003366478,0.001207429,0.011447997,0.00627332,0.0016963521,0.0049910685,0.0271264],"category_scores_gemma":[0.0025760136,0.00017768126,0.00041062752,0.004010855,0.006049288,0.0034968855,0.0019407498,0.0030499091,0.0010809962],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013355674,0.00015806711,0.014028445,0.00064069586,0.000022438402,0.0010595777,0.0067875017,0.0004247757,0.00046885532,0.17873494,0.66067743,0.13686363],"study_design_scores_gemma":[0.000019512876,0.00004708547,0.016299872,0.0008484013,0.00002451109,0.00045046932,0.035956923,0.0004605008,0.00016657021,0.011371893,0.9342577,0.00009649543],"about_ca_topic_score_codex":0.9845866,"about_ca_topic_score_gemma":0.99241054,"teacher_disagreement_score":0.052009627,"about_ca_system_score_codex":0.052009627,"about_ca_system_score_gemma":0.1643376,"threshold_uncertainty_score":0.37735802},"labels":[],"label_agreement":null},{"id":"W7097879403","doi":"","title":"The Impact of Electricity Pricing Schemes on Storage Adoption","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity pricing; Subsidy; Grid; Peak load; Energy storage; Peak demand; Electricity market; Electricity retailing","score_opus":0.009798236322358447,"score_gpt":0.22935291445072253,"score_spread":0.2195546781283641,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097879403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98871416,0.00015742,0.00034751822,0.0004492393,0.000009511285,0.000041989257,0.00050081435,0.00001704947,0.009762172],"genre_scores_gemma":[0.99883956,0.000058645925,0.000105659354,0.00002783351,0.0000022710453,0.0000059068334,0.00013888461,0.000002215749,0.0008189354],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833965,0.00057016866,0.000067281384,0.00010804902,0.00036066351,0.0005542478],"domain_scores_gemma":[0.9853672,0.008883705,0.0021379064,0.00053872727,0.0022617667,0.0008107487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019114137,0.00028462024,0.00029338096,0.0004701848,0.00058349647,0.001715356,0.0008776087,0.00069795793,0.0061201323],"category_scores_gemma":[0.013747479,0.00015989743,0.00044383254,0.0011400128,0.0009046696,0.0014371688,0.0006230073,0.00077668595,0.0002282358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0036081343,0.001657789,0.7075268,0.0002772296,0.0002974753,0.0010811642,0.0010019763,0.1875973,0.008816446,0.023278212,0.00762748,0.057229992],"study_design_scores_gemma":[0.00021760658,0.0012629463,0.8137556,0.000063814674,0.00023376121,0.00026088246,0.0051590507,0.1635407,0.0051602516,0.004179393,0.006070152,0.00009599223],"about_ca_topic_score_codex":0.27663177,"about_ca_topic_score_gemma":0.39025617,"teacher_disagreement_score":0.27663177,"about_ca_system_score_codex":0.0066748126,"about_ca_system_score_gemma":0.0028309622,"threshold_uncertainty_score":0.5500432},"labels":[],"label_agreement":null},{"id":"W7100432710","doi":"","title":"On Animates and Other Worldly Things","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scripting language; Representation (politics); Cognitive development; Cognition; Behaviorism; Judgement","score_opus":0.004134348314330158,"score_gpt":0.16654369102097583,"score_spread":0.16240934270664567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100432710","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0104681775,0.20462714,0.019185081,0.06979872,0.006490316,0.000025940994,0.00016078084,0.00009674568,0.6891471],"genre_scores_gemma":[0.45953026,0.18573704,0.017044999,0.031047026,0.016712308,0.00017374405,0.0003465107,0.0004402846,0.28896782],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99921036,0.00043717917,0.00002329884,0.0001302531,0.00013979115,0.00005902299],"domain_scores_gemma":[0.9987556,0.0008809414,0.00005509053,0.000105038256,0.00012581315,0.000077492165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009303795,0.0005838497,0.00041575904,0.00126931,0.0023383284,0.0037872614,0.0005494528,0.0017358739,0.010027023],"category_scores_gemma":[0.0017114172,0.00023692672,0.0003054357,0.00091426296,0.010976181,0.006123922,0.0018102671,0.0028055683,0.001943148],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066575044,0.000005772733,0.00008657924,0.00003942491,0.0000035740052,0.000060158138,0.0018414245,0.00008365594,0.00010960016,0.97395486,0.013905237,0.009903018],"study_design_scores_gemma":[0.0000027328808,0.0000132535215,0.00034338437,0.00021380615,0.0000030861281,0.00018621012,0.00067364576,0.00014931016,0.00011796142,0.46220514,0.53608173,0.000009701607],"about_ca_topic_score_codex":0.0026854414,"about_ca_topic_score_gemma":0.0038201096,"teacher_disagreement_score":0.010027023,"about_ca_system_score_codex":0.0016243722,"about_ca_system_score_gemma":0.00048558819,"threshold_uncertainty_score":0.033543706},"labels":[],"label_agreement":null},{"id":"W7116685687","doi":"10.1109/tce.2025.3646842","title":"Energy Consumption Forecasting in Net-Zero Energy Buildings: Firefly-Driven LSTM for Smart Consumer Electronics and Edge-Based Energy Optimization","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Consumer Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Energy consumption; Energy (signal processing); Convergence (economics); Efficient energy use; Renewable energy; Chaotic; Population; Demand response","score_opus":0.012898507041403036,"score_gpt":0.22294263051899849,"score_spread":0.21004412347759546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116685687","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13282925,0.0019503756,0.8558826,0.00091335963,0.00024355954,0.000037369664,0.00020844676,0.001460513,0.0064744917],"genre_scores_gemma":[0.9441508,0.00045890707,0.051759027,0.00029553214,0.00006376871,0.00004910059,0.00023482289,0.00006208778,0.0029259247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99992657,0.000013305969,0.0000042455,0.00002450093,0.000014575666,0.000016780587],"domain_scores_gemma":[0.9999081,0.00004091679,0.000014578678,0.0000057973716,0.000021771173,0.000008885739],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002576517,0.0006488523,0.00058808475,0.00021555528,0.0001832285,0.00044138692,0.000842591,0.0007392883,0.0009732553],"category_scores_gemma":[0.00058505824,0.00026279097,0.0004628091,0.00038385493,0.00027755054,0.0006296476,0.00041754855,0.00085301365,0.00022475897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058921003,0.000036647078,0.0008338207,0.000042228905,0.00003319333,0.0000603062,0.000028171458,0.9473593,0.0028563796,0.0018615477,0.0014351292,0.045394372],"study_design_scores_gemma":[9.768794e-7,0.0000027947806,0.000033412176,0.0000012209422,0.0000016136615,0.0000023623143,0.0000010153202,0.99943846,0.00015252772,0.00030352423,0.000060952087,9.948309e-7],"about_ca_topic_score_codex":0.00742549,"about_ca_topic_score_gemma":0.008078081,"teacher_disagreement_score":0.00742549,"about_ca_system_score_codex":0.0005935557,"about_ca_system_score_gemma":0.00052355404,"threshold_uncertainty_score":0.014764547},"labels":[],"label_agreement":null},{"id":"W7117458052","doi":"10.1109/icprs66293.2025.11302856","title":"Energy Disaggregation Using Radial Basis Function Neural Networks based on Deep Co Training Architecture","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Robustness (evolution); Software deployment; Artificial neural network; Convergence (economics); Key (lock); Function (biology); Energy (signal processing); Efficient energy use; Energy consumption","score_opus":0.012147441566795841,"score_gpt":0.2111239903974648,"score_spread":0.19897654883066895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117458052","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06852675,0.00089302874,0.9224419,0.00032571921,0.00007869862,0.000050498897,0.00024210314,0.0038665752,0.0035747087],"genre_scores_gemma":[0.8472585,0.0002772458,0.14739735,0.00024727985,0.000049982427,0.000078199126,0.00088716036,0.00013771311,0.003666572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995191,0.00013594479,0.000023252667,0.00015661752,0.00010637033,0.0000587528],"domain_scores_gemma":[0.9993691,0.00020385665,0.00008141169,0.00011943827,0.00020098328,0.000025274461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084337214,0.00091616355,0.00089789403,0.0005806454,0.00032416536,0.0006962748,0.0010883918,0.0007214325,0.0007991886],"category_scores_gemma":[0.0021329904,0.00033014957,0.00054656685,0.00083168945,0.00037589218,0.0011420518,0.00089371426,0.0012144783,0.0005850164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025162837,0.00020890121,0.0039120857,0.00008957364,0.00013429757,0.0000963277,0.0001166209,0.61306167,0.0061889123,0.0026116553,0.0045595746,0.36876875],"study_design_scores_gemma":[0.000002201347,0.000009373787,0.0002475048,0.0000030793042,0.0000042459724,0.000007788185,0.0000045383217,0.99801123,0.0008276703,0.00065361283,0.0002252893,0.0000035170347],"about_ca_topic_score_codex":0.009732794,"about_ca_topic_score_gemma":0.013804353,"teacher_disagreement_score":0.009732794,"about_ca_system_score_codex":0.0006305111,"about_ca_system_score_gemma":0.0006695715,"threshold_uncertainty_score":0.019352257},"labels":[],"label_agreement":null},{"id":"W7117469469","doi":"10.1109/icprs66293.2025.11302817","title":"Classification of Electrical Appliances using Deep Convolutional Subspace Clustering","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Cluster analysis; Pattern recognition (psychology); Subspace topology; Process (computing); Rank (graph theory); Correlation clustering; Clustering high-dimensional data; Random subspace method","score_opus":0.021542453429101622,"score_gpt":0.25579781651426603,"score_spread":0.2342553630851644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117469469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24977891,0.00066239486,0.7348782,0.00041338548,0.00009668518,0.00008084268,0.0015848989,0.0068556755,0.005648933],"genre_scores_gemma":[0.8694919,0.00021470682,0.120915145,0.00010811395,0.000035523095,0.000050008955,0.003916054,0.00012676681,0.0051417686],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999663,0.000058824728,0.000015439604,0.000102510385,0.00008713245,0.00007308767],"domain_scores_gemma":[0.999708,0.000049940194,0.000035214944,0.000067297304,0.0001186896,0.000020900688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030715478,0.0006721952,0.0006114204,0.001152543,0.00030642297,0.00055019534,0.00071676704,0.00051175256,0.0016290483],"category_scores_gemma":[0.00073254417,0.00020542565,0.0006999943,0.0013766395,0.00027493524,0.00084916677,0.0005476703,0.0006719083,0.0008928763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034478478,0.000364648,0.0061190524,0.000069356625,0.00012449418,0.00012619843,0.00009601137,0.47121137,0.016561965,0.005743695,0.011685248,0.48755324],"study_design_scores_gemma":[0.00000257709,0.000011525575,0.0006272957,0.0000019613863,0.0000030419976,0.0000103947,0.000011833378,0.99555355,0.0017088759,0.001650288,0.00041323926,0.0000053835174],"about_ca_topic_score_codex":0.012469924,"about_ca_topic_score_gemma":0.019645886,"teacher_disagreement_score":0.012469924,"about_ca_system_score_codex":0.00088417705,"about_ca_system_score_gemma":0.0006795229,"threshold_uncertainty_score":0.024794698},"labels":[],"label_agreement":null},{"id":"W7120472657","doi":"","title":"Evaluation of hour rate effects for rural consumers using generation photovoltaic and/or biomass","year":2020,"lang":"pt","type":"dissertation","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tariff; Photovoltaic system; Renewable energy; Electricity; Feed-in tariff; Consumption (sociology); Distributed generation; Energy consumption; Rural area","score_opus":0.04233337753921492,"score_gpt":0.2755069680616198,"score_spread":0.23317359052240486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7120472657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9910937,0.0001281008,0.002530834,0.00003237679,0.000017023385,0.000048510887,0.00011745632,0.000045342473,0.005986708],"genre_scores_gemma":[0.99802315,0.000079339276,0.0006172503,0.0000060998286,0.0000019846768,0.000012790931,0.000051938812,0.000013273853,0.0011941348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994981,0.00014388762,0.0000147612345,0.000052407093,0.00019526194,0.00009549954],"domain_scores_gemma":[0.99896264,0.00054177083,0.000101398764,0.00008634621,0.00025706677,0.00005074618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088979723,0.00050711905,0.00039611137,0.00055992143,0.00038954258,0.0007395716,0.00066656916,0.0004172229,0.0041954075],"category_scores_gemma":[0.0017371716,0.00015867584,0.0005360326,0.0005965667,0.00033585436,0.00063768885,0.00042889907,0.00044880732,0.0004039663],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0077921124,0.0021233459,0.029875567,0.0010004526,0.00017073647,0.0015402398,0.0006288284,0.7003031,0.12424163,0.0054943124,0.0030111873,0.12381855],"study_design_scores_gemma":[0.00028033988,0.021362586,0.091201894,0.00009847037,0.00055069197,0.00057506026,0.003659367,0.68356663,0.18791404,0.0021702547,0.008482722,0.00013794577],"about_ca_topic_score_codex":0.0024933182,"about_ca_topic_score_gemma":0.0036348002,"teacher_disagreement_score":0.0041954075,"about_ca_system_score_codex":0.0006653699,"about_ca_system_score_gemma":0.00017177632,"threshold_uncertainty_score":0.014035106},"labels":[],"label_agreement":null},{"id":"W7124270067","doi":"10.65109/dkjg9853","title":"Multiple-Profile Prediction-of-Use Games","year":2017,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Incentive; Electricity; Term (time); Transferable utility; Convexity; Game theory","score_opus":0.026271026014129364,"score_gpt":0.2219204349785035,"score_spread":0.19564940896437413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124270067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1479758,0.00037490114,0.8203701,0.0028898413,0.00018834123,0.0006133035,0.0016812315,0.00038456326,0.025521988],"genre_scores_gemma":[0.95333636,0.00020591433,0.037571013,0.00036519364,0.000059214653,0.00043897022,0.00029792055,0.000044043638,0.007681366],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99600464,0.0022712364,0.00016490168,0.0006719982,0.00046042833,0.0004267299],"domain_scores_gemma":[0.9893444,0.007923987,0.0011053717,0.000599564,0.0005110929,0.0005155529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038261954,0.0019060757,0.002273001,0.00062805484,0.00074828963,0.0018760916,0.003053074,0.0026357963,0.0061051296],"category_scores_gemma":[0.017583942,0.0006371424,0.0010620008,0.0008909866,0.0014187848,0.003628099,0.0020703578,0.0033163133,0.00062758545],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006431237,0.0003432797,0.0057751527,0.00019522599,0.00017924249,0.0008987022,0.0006273492,0.56154495,0.0018779878,0.38414907,0.0069589037,0.036806967],"study_design_scores_gemma":[0.0000795621,0.000071904564,0.0005003884,0.000015042979,0.000019570409,0.000094675444,0.00007115372,0.8822031,0.00034288227,0.11511089,0.0014555579,0.00003529301],"about_ca_topic_score_codex":0.0048106266,"about_ca_topic_score_gemma":0.006263993,"teacher_disagreement_score":0.0061051296,"about_ca_system_score_codex":0.0017967485,"about_ca_system_score_gemma":0.0012002713,"threshold_uncertainty_score":0.02042365},"labels":[],"label_agreement":null},{"id":"W7124289162","doi":"10.65109/miuo2230","title":"Multi-Agent Reinforcement Learning for Fast-Timescale Demand Response of Residential Loads","year":2023,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Demand response; Reinforcement learning; Scale (ratio); Renewable energy; Constant (computer programming); Power (physics); Load management; Response time; Reinforcement","score_opus":0.0191857791473649,"score_gpt":0.25196836025989644,"score_spread":0.23278258111253153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124289162","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07256795,0.00012711508,0.9249311,0.00022420002,0.000039373004,0.000036003403,0.000021303842,0.00050125236,0.0015516839],"genre_scores_gemma":[0.97898096,0.000029193634,0.020075202,0.000045674606,0.000012609221,0.000037596354,0.000017741453,0.000020520747,0.00078038016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970144,0.00011767839,0.000011154744,0.00006379686,0.000057097554,0.000048777103],"domain_scores_gemma":[0.99891746,0.0006428524,0.00014934613,0.00008374523,0.00013051492,0.00007615148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008949328,0.00046446334,0.000630463,0.00016993153,0.0002739995,0.0003579209,0.0007043194,0.0005237133,0.0009433581],"category_scores_gemma":[0.0030109417,0.0002590975,0.00020719545,0.0001461332,0.00062376447,0.00046446713,0.0006849229,0.00090385746,0.0001666763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034270884,0.000025186764,0.00022425094,0.000011986238,0.000008246918,0.000022327176,0.000017558594,0.99046654,0.0007868556,0.0015580313,0.00022422399,0.006620503],"study_design_scores_gemma":[0.0000036080712,0.000006157997,0.00002055424,4.2373313e-7,6.064726e-7,0.0000012094679,0.0000010047422,0.999428,0.00009649499,0.00041002416,0.00003116556,7.201938e-7],"about_ca_topic_score_codex":0.003862714,"about_ca_topic_score_gemma":0.003701778,"teacher_disagreement_score":0.003862714,"about_ca_system_score_codex":0.00049190375,"about_ca_system_score_gemma":0.0007817295,"threshold_uncertainty_score":0.0076804757},"labels":[],"label_agreement":null},{"id":"W7125579747","doi":"10.1109/wsc68292.2025.11338932","title":"Generating Artificial Electricity Data for Monitoring Energy Consumption in Smart Cities","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Systems, Applications & Products in Data Processing (Canada)","funders":"","keywords":"Electricity; Energy consumption; Consumption (sociology); Energy (signal processing); Power consumption; Mains electricity","score_opus":0.05011745206221197,"score_gpt":0.2769710645963577,"score_spread":0.2268536125341457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125579747","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93366694,0.00010086125,0.056154642,0.0004534225,0.00017693955,0.00009290489,0.0035957221,0.0013768893,0.0043817833],"genre_scores_gemma":[0.9866463,0.0000412857,0.0110606095,0.000024274963,0.000015626529,0.000023408318,0.0017641038,0.000027462054,0.0003968085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968576,0.00011035875,0.000022386022,0.000055365843,0.000103212544,0.00002296279],"domain_scores_gemma":[0.99894947,0.00054557476,0.00009696489,0.0001748025,0.00020104762,0.00003228203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005122823,0.00037696332,0.00029780623,0.000891193,0.00018418419,0.00056130404,0.00043224893,0.0005224952,0.0008143143],"category_scores_gemma":[0.0028913456,0.00021119435,0.00018565186,0.0012297139,0.00022639983,0.0009342707,0.0003896239,0.00048876734,0.00031348522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005216729,0.0005428106,0.07038063,0.00017785677,0.00015791175,0.0002735954,0.00014166826,0.77171946,0.014327832,0.0030737577,0.0077342503,0.1309486],"study_design_scores_gemma":[0.00001759322,0.000037066828,0.009457549,0.00000529535,0.000012663356,0.000021348973,0.000042055522,0.98239017,0.005241375,0.00180309,0.000961471,0.000010443997],"about_ca_topic_score_codex":0.0031379783,"about_ca_topic_score_gemma":0.004970285,"teacher_disagreement_score":0.0031379783,"about_ca_system_score_codex":0.00037529366,"about_ca_system_score_gemma":0.00027187893,"threshold_uncertainty_score":0.006239414},"labels":[],"label_agreement":null},{"id":"W7128035640","doi":"10.22260/crc-csce-2025/0012","title":"Business Model Evaluation of Renewable Energy Community in Multi Unit Residential Building in Canada net metering, considering the regulatory framework, ownership and organizational structure","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Unit (ring theory); Renewable energy; Business model; Organizational structure; Mode (computer interface); Net (polyhedron)","score_opus":0.03623344720947026,"score_gpt":0.2493100848305004,"score_spread":0.21307663762103013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128035640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97917503,0.00007795971,0.0026731533,0.00019563084,0.000006192678,0.0001378441,0.00037260537,0.00003388087,0.017327737],"genre_scores_gemma":[0.9946379,0.0000641195,0.0031713273,0.0000140288,9.59363e-7,0.000030514162,0.0002671432,0.000008109326,0.0018059064],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99920744,0.00031708195,0.000019321145,0.00007391028,0.00016662008,0.00021561788],"domain_scores_gemma":[0.99796367,0.00093869073,0.00009849043,0.00008147937,0.0007230651,0.00019459102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017167676,0.0004883901,0.0003687733,0.0010809493,0.0012283723,0.0029194523,0.0011521105,0.00058640254,0.0032121025],"category_scores_gemma":[0.003058096,0.00019568701,0.00061124214,0.001099031,0.0009195708,0.0008271683,0.0007329478,0.00065314013,0.00016021397],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005458091,0.00059681357,0.054949094,0.00015630358,0.00006829472,0.00059296476,0.0009772175,0.8793671,0.0021077553,0.037779294,0.0024148263,0.02044455],"study_design_scores_gemma":[0.000033162924,0.0000901295,0.008142899,0.00002185221,0.00003333606,0.000023431683,0.0023425184,0.9857153,0.00076792284,0.0009898662,0.0018191899,0.000020497246],"about_ca_topic_score_codex":0.8665288,"about_ca_topic_score_gemma":0.89366937,"teacher_disagreement_score":0.13347119,"about_ca_system_score_codex":0.030546626,"about_ca_system_score_gemma":0.013958171,"threshold_uncertainty_score":0.2685144},"labels":[],"label_agreement":null},{"id":"W7139952824","doi":"10.1109/isgtasia63446.2025.11431487","title":"Adaptive ADMM for Distributed Peer-To-Peer Energy Trading","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy (signal processing); Energy consumption; Feature (linguistics); Context (archaeology); Production (economics)","score_opus":0.015156885028462984,"score_gpt":0.23669056024898044,"score_spread":0.22153367522051745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7139952824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024654458,0.000091907976,0.9959636,0.00007518585,0.000031754942,0.000018984723,0.000016913002,0.0000875624,0.0012486301],"genre_scores_gemma":[0.50195783,0.00030555238,0.4921154,0.00022381335,0.00009654142,0.00025786433,0.0001702773,0.00009018667,0.0047825463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994398,0.00021618819,0.00002640436,0.00010320329,0.00016940622,0.000044903467],"domain_scores_gemma":[0.99936587,0.00036715047,0.00006670785,0.000054326585,0.00012161705,0.000024308914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012004646,0.0008380456,0.0010522517,0.00028142327,0.0003982799,0.00076907675,0.0013992492,0.0012444017,0.001948968],"category_scores_gemma":[0.0019678562,0.00036513113,0.00055102614,0.00052756065,0.0006640551,0.00097282237,0.0010727948,0.0014389395,0.0004057652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041767642,0.000028390094,0.00017438257,0.000055968518,0.000028907552,0.000052797437,0.000025543446,0.956372,0.001381656,0.012034698,0.0011481033,0.028655635],"study_design_scores_gemma":[0.0000058720157,0.000010199047,0.000015997637,0.0000019151294,0.0000017397883,0.00000898375,0.0000025763534,0.996959,0.00016957919,0.0023250824,0.00049724354,0.000001898016],"about_ca_topic_score_codex":0.0017042479,"about_ca_topic_score_gemma":0.0018336192,"teacher_disagreement_score":0.001948968,"about_ca_system_score_codex":0.00040688465,"about_ca_system_score_gemma":0.0009936766,"threshold_uncertainty_score":0.0065199733},"labels":[],"label_agreement":null},{"id":"W7143405636","doi":"10.71465/ajiot2982","title":"The Impact of Iot On Smart Energy Solutions: Reducing Consumption and Emissions","year":2023,"lang":"","type":"article","venue":"American Journal Of Internet Of Things","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Enabling; Internet of Things; Energy consumption; Renewable energy; Key (lock); Sustainability; Efficient energy use; Consumption (sociology); Automation; Smart grid","score_opus":0.016134352340681505,"score_gpt":0.26268567932833475,"score_spread":0.24655132698765325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7143405636","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.105180375,0.04313601,0.066925034,0.08251822,0.0025784534,0.00007511076,0.0003985397,0.0003456496,0.69884264],"genre_scores_gemma":[0.89861494,0.047144923,0.024475584,0.005862217,0.0009485812,0.00008229803,0.0002620387,0.00015759993,0.022451855],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.999554,0.00013302095,0.0000138933,0.000037745776,0.0001966573,0.00006465031],"domain_scores_gemma":[0.9996549,0.00016013406,0.00003642307,0.000040636744,0.00007911094,0.000028732673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005405724,0.00043232826,0.00016417073,0.00048517177,0.00084964023,0.0024822943,0.00035111108,0.0011721529,0.004034535],"category_scores_gemma":[0.0009142138,0.00013573184,0.00027900818,0.0013090894,0.0013719393,0.0038130428,0.0014587598,0.001078878,0.0006660098],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000070694376,0.00012396298,0.0049201124,0.0005918558,0.00004591046,0.0003051454,0.0006146241,0.011003709,0.0055057625,0.6979419,0.027482796,0.25139353],"study_design_scores_gemma":[0.000014655514,0.00010289826,0.0050710742,0.0009120598,0.000041103583,0.00037513088,0.002458092,0.01498548,0.007454654,0.44819006,0.5203533,0.000041432402],"about_ca_topic_score_codex":0.0014050993,"about_ca_topic_score_gemma":0.0022068426,"teacher_disagreement_score":0.004034535,"about_ca_system_score_codex":0.00091406656,"about_ca_system_score_gemma":0.0011241827,"threshold_uncertainty_score":0.013496935},"labels":[],"label_agreement":null},{"id":"W7148216823","doi":"","title":"Business Model Evaluation of Renewable Energy Community in Multi Unit Residential Building in Canada Net Metering, Considering the Regulatory Framework, Ownership and Organizational Structure","year":2025,"lang":"","type":"article","venue":"Lincoln (University of Nebraska)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Business model; Corporate governance; Distribution (mathematics); Electricity; Unit (ring theory); Net metering; Electric power distribution","score_opus":0.02824399563752053,"score_gpt":0.218415837691085,"score_spread":0.19017184205356447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7148216823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9790831,0.00007127254,0.0026549387,0.00019187584,0.000005952542,0.0001417167,0.0003522306,0.00003533419,0.017463524],"genre_scores_gemma":[0.9947313,0.000060108647,0.00314478,0.000013648919,9.0302115e-7,0.000029483606,0.00024735194,0.000008037441,0.0017643183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919194,0.00032889083,0.000019689403,0.00007333236,0.00017142945,0.00021475898],"domain_scores_gemma":[0.99792445,0.0009551058,0.00010151542,0.00008248802,0.0007446087,0.00019191114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017578622,0.0004768337,0.00035749155,0.0010456821,0.0012310962,0.0028279447,0.0011404493,0.0005510445,0.0030957668],"category_scores_gemma":[0.003180938,0.00019091691,0.0005875231,0.001078808,0.0008986155,0.000833515,0.000726832,0.0006211735,0.00015878196],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005639927,0.0006256016,0.0578632,0.00015313253,0.00007017004,0.0005419191,0.0010143965,0.87590283,0.002092847,0.03695818,0.0025161172,0.021697663],"study_design_scores_gemma":[0.00003388067,0.00010168782,0.008295832,0.000020668791,0.00003433691,0.000021681704,0.0023980679,0.9855144,0.00079724594,0.0009528608,0.0018086837,0.00002062093],"about_ca_topic_score_codex":0.8741652,"about_ca_topic_score_gemma":0.9009783,"teacher_disagreement_score":0.12583482,"about_ca_system_score_codex":0.031831335,"about_ca_system_score_gemma":0.014477669,"threshold_uncertainty_score":0.2531517},"labels":[],"label_agreement":null},{"id":"W7148314507","doi":"10.1007/978-3-032-07031-9_14","title":"Electricity Price Dynamics in the Smart Grid","year":2025,"lang":"en","type":"book-chapter","venue":"Static & dynamic game theory: foundations & applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"","keywords":"Electricity; Electricity market; Smart grid; Mains electricity; Supply and demand; Process (computing); System dynamics; Noise (video)","score_opus":0.0061879351751723995,"score_gpt":0.22705014276611507,"score_spread":0.22086220759094266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7148314507","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09585341,0.008774221,0.2839026,0.012426071,0.0011388971,0.000043488366,0.00042623398,0.0002107393,0.5972243],"genre_scores_gemma":[0.88474053,0.0051716394,0.009152083,0.0004196745,0.0002713087,0.00003166294,0.0001112764,0.000075344455,0.10002655],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99987364,0.000043200624,0.0000032646026,0.000017508599,0.000047597936,0.000014908011],"domain_scores_gemma":[0.99985886,0.00008015738,0.000011507331,0.000014744483,0.000023648017,0.000011047638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021710533,0.0002642323,0.00028893573,0.00019321023,0.00025086894,0.0015266844,0.00050570647,0.00075353193,0.0052689835],"category_scores_gemma":[0.0009943808,0.00024988636,0.00027513193,0.0005950386,0.0007742565,0.002388386,0.00041923785,0.0010191925,0.00051636185],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009440254,0.000014558932,0.00013613199,0.000014338986,0.000004688737,0.000034556117,0.000041443538,0.053055447,0.0002770503,0.93171185,0.0051423884,0.009558071],"study_design_scores_gemma":[0.0000048296215,0.000009434088,0.0002413663,0.000013722314,0.0000028615761,0.000036714486,0.000060049602,0.17076299,0.00012817132,0.8153992,0.013333151,0.0000074624013],"about_ca_topic_score_codex":0.0030409414,"about_ca_topic_score_gemma":0.0023728365,"teacher_disagreement_score":0.0052689835,"about_ca_system_score_codex":0.0012432437,"about_ca_system_score_gemma":0.00045140611,"threshold_uncertainty_score":0.017626524},"labels":[],"label_agreement":null},{"id":"W7154204599","doi":"10.5281/zenodo.19566272","title":"Flexibility In Future Power Systems","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Electric power system; Electricity; Power grid; Power (physics); Grid","score_opus":0.014364370048850295,"score_gpt":0.20116089897549647,"score_spread":0.18679652892664617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154204599","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011012878,0.016606985,0.10554702,0.026873065,0.0021286798,0.00012475222,0.00072463823,0.0004266877,0.8365554],"genre_scores_gemma":[0.79277354,0.021788456,0.03451108,0.005011634,0.002915751,0.0003842564,0.0010844358,0.0003060379,0.14122476],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804235,0.00072493043,0.00010635051,0.00033587465,0.00056878634,0.00022161841],"domain_scores_gemma":[0.99872726,0.00040861047,0.00013973132,0.0003064174,0.00027605708,0.00014184733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023626473,0.0006830413,0.00041491137,0.0012371499,0.0017999061,0.00600526,0.0009330701,0.0018926464,0.027164785],"category_scores_gemma":[0.0040942053,0.00031155243,0.00071737217,0.001977376,0.004362962,0.006594418,0.0032411644,0.0028147267,0.0037448425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008091702,0.0000061840506,0.00016099923,0.00006246486,0.000008711524,0.000090100155,0.00036399937,0.0034760833,0.00010978031,0.9594416,0.01311805,0.023153873],"study_design_scores_gemma":[0.000007243289,0.000022898526,0.0003999312,0.00022040555,0.0000047870235,0.00016953364,0.0002873549,0.0017959835,0.00011098933,0.62634933,0.37061125,0.000020250089],"about_ca_topic_score_codex":0.0029085584,"about_ca_topic_score_gemma":0.0020594765,"teacher_disagreement_score":0.027164785,"about_ca_system_score_codex":0.0034093799,"about_ca_system_score_gemma":0.0020752056,"threshold_uncertainty_score":0.09087527},"labels":[],"label_agreement":null},{"id":"W7154207008","doi":"10.5281/zenodo.19566273","title":"Flexibility In Future Power Systems","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Electric power system; Electricity; Power grid; Power (physics); Grid","score_opus":0.014364370048850295,"score_gpt":0.20116089897549647,"score_spread":0.18679652892664617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154207008","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011012878,0.016606985,0.10554702,0.026873065,0.0021286798,0.00012475222,0.00072463823,0.0004266877,0.8365554],"genre_scores_gemma":[0.79277354,0.021788456,0.03451108,0.005011634,0.002915751,0.0003842564,0.0010844358,0.0003060379,0.14122476],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804235,0.00072493043,0.00010635051,0.00033587465,0.00056878634,0.00022161841],"domain_scores_gemma":[0.99872726,0.00040861047,0.00013973132,0.0003064174,0.00027605708,0.00014184733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023626473,0.0006830413,0.00041491137,0.0012371499,0.0017999061,0.00600526,0.0009330701,0.0018926464,0.027164785],"category_scores_gemma":[0.0040942053,0.00031155243,0.00071737217,0.001977376,0.004362962,0.006594418,0.0032411644,0.0028147267,0.0037448425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008091702,0.0000061840506,0.00016099923,0.00006246486,0.000008711524,0.000090100155,0.00036399937,0.0034760833,0.00010978031,0.9594416,0.01311805,0.023153873],"study_design_scores_gemma":[0.000007243289,0.000022898526,0.0003999312,0.00022040555,0.0000047870235,0.00016953364,0.0002873549,0.0017959835,0.00011098933,0.62634933,0.37061125,0.000020250089],"about_ca_topic_score_codex":0.0029085584,"about_ca_topic_score_gemma":0.0020594765,"teacher_disagreement_score":0.027164785,"about_ca_system_score_codex":0.0034093799,"about_ca_system_score_gemma":0.0020752056,"threshold_uncertainty_score":0.09087527},"labels":[],"label_agreement":null},{"id":"W7165448998","doi":"10.5281/zenodo.20773504","title":"Significance of Smart meters in Modern Energy Management Systems","year":2020,"lang":"en","type":"article","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Smart grid; Renewable energy; Software deployment; Energy management; Big data; Net metering; Default gateway; Demand response; Electricity; Distributed generation","score_opus":0.029912361636229276,"score_gpt":0.22208618085707027,"score_spread":0.19217381922084098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7165448998","genre_codex":"review","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029176168,0.4600212,0.2022857,0.12244169,0.0061933403,0.00012726641,0.0005447079,0.00059459865,0.17861533],"genre_scores_gemma":[0.70361257,0.22392032,0.04296409,0.010773359,0.0075902073,0.00011950784,0.00026858383,0.000100498255,0.010650952],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.998089,0.00080452743,0.00012172756,0.00026092693,0.0006340909,0.00008972102],"domain_scores_gemma":[0.9963666,0.002067105,0.0004051607,0.0002733114,0.0007629857,0.00012474849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025685374,0.00062869384,0.00043526094,0.0014987326,0.00078771217,0.005825113,0.0007725088,0.001958915,0.0028359958],"category_scores_gemma":[0.005088088,0.0003703326,0.00037776268,0.00334507,0.0034067398,0.007687226,0.0021856,0.0037395358,0.0005982989],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003073611,0.00002044251,0.0017238356,0.0007650087,0.00004127808,0.00017303324,0.00051042525,0.010067681,0.00058933307,0.851182,0.012449694,0.12244661],"study_design_scores_gemma":[0.000010209432,0.0000580384,0.0022508148,0.0020081825,0.00003247962,0.00027343896,0.0007654088,0.0135022495,0.00087571424,0.6162892,0.36388996,0.000044235894],"about_ca_topic_score_codex":0.0012945221,"about_ca_topic_score_gemma":0.0010017315,"teacher_disagreement_score":0.005825113,"about_ca_system_score_codex":0.0021130755,"about_ca_system_score_gemma":0.0016445019,"threshold_uncertainty_score":0.015331507},"labels":[],"label_agreement":null},{"id":"W7165467434","doi":"10.5281/zenodo.20773505","title":"Significance of Smart meters in Modern Energy Management Systems","year":2020,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Smart grid; Renewable energy; Software deployment; Energy management; Big data; Net metering; Default gateway; Demand response; Electricity; Distributed generation","score_opus":0.025991780330341795,"score_gpt":0.19256352415412495,"score_spread":0.16657174382378315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7165467434","genre_codex":"review","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029176168,0.4600212,0.2022857,0.12244169,0.0061933403,0.00012726641,0.0005447079,0.00059459865,0.17861533],"genre_scores_gemma":[0.70361257,0.22392032,0.04296409,0.010773359,0.0075902073,0.00011950784,0.00026858383,0.000100498255,0.010650952],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.998089,0.00080452743,0.00012172756,0.00026092693,0.0006340909,0.00008972102],"domain_scores_gemma":[0.9963666,0.002067105,0.0004051607,0.0002733114,0.0007629857,0.00012474849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025685374,0.00062869384,0.00043526094,0.0014987326,0.00078771217,0.005825113,0.0007725088,0.001958915,0.0028359958],"category_scores_gemma":[0.005088088,0.0003703326,0.00037776268,0.00334507,0.0034067398,0.007687226,0.0021856,0.0037395358,0.0005982989],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003073611,0.00002044251,0.0017238356,0.0007650087,0.00004127808,0.00017303324,0.00051042525,0.010067681,0.00058933307,0.851182,0.012449694,0.12244661],"study_design_scores_gemma":[0.000010209432,0.0000580384,0.0022508148,0.0020081825,0.00003247962,0.00027343896,0.0007654088,0.0135022495,0.00087571424,0.6162892,0.36388996,0.000044235894],"about_ca_topic_score_codex":0.0012945221,"about_ca_topic_score_gemma":0.0010017315,"teacher_disagreement_score":0.005825113,"about_ca_system_score_codex":0.0021130755,"about_ca_system_score_gemma":0.0016445019,"threshold_uncertainty_score":0.015331507},"labels":[],"label_agreement":null},{"id":"W774520142","doi":"10.1016/j.scs.2015.06.004","title":"Quasi real-time ZIP load modeling for Conservation Voltage Reduction of smart distribution networks using disaggregated AMI data","year":2015,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Voltage reduction; Metering mode; Smart grid; Real-time computing; Energy conservation; Computer science; Energy (signal processing); Energy consumption; Reliability engineering; Reduction (mathematics); Voltage; Engineering; Automotive engineering; Simulation; Electrical engineering; Statistics; Mathematics","score_opus":0.030319901198172565,"score_gpt":0.23790116298307176,"score_spread":0.2075812617848992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W774520142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54506105,0.00025431503,0.44741422,0.00045035983,0.00011806913,0.00006442945,0.0017250825,0.0012287409,0.00368368],"genre_scores_gemma":[0.98916876,0.00004552421,0.009519049,0.000019258267,0.00002141403,0.000020831096,0.0004688828,0.000028194689,0.0007080395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997582,0.00010415606,0.0000105062045,0.000057453115,0.000036405647,0.000033405275],"domain_scores_gemma":[0.9991322,0.0005193906,0.000073655225,0.00010646624,0.00013781631,0.00003052043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073079334,0.00039551785,0.0005273688,0.0002704361,0.00023959707,0.0005423266,0.0009354152,0.0004623448,0.0018102456],"category_scores_gemma":[0.0025999746,0.00030226712,0.00047331644,0.0006900467,0.00028687515,0.0010682538,0.00035786012,0.00075510977,0.00027357452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042186646,0.00001764198,0.0006668201,0.000009214317,0.000010370909,0.000009906953,0.000010477498,0.9948192,0.00016451704,0.0009911451,0.00023819196,0.003020291],"study_design_scores_gemma":[8.8944967e-7,0.0000022754086,0.00010463681,2.4587396e-7,7.2925275e-7,8.3874454e-7,0.0000016778836,0.9996512,0.000026529271,0.00018980936,0.000020582605,5.898537e-7],"about_ca_topic_score_codex":0.021715317,"about_ca_topic_score_gemma":0.017894661,"teacher_disagreement_score":0.021715317,"about_ca_system_score_codex":0.00066500227,"about_ca_system_score_gemma":0.00051710365,"threshold_uncertainty_score":0.043177843},"labels":[],"label_agreement":null}]}