{"meta":{"query_hash":"7435e0e23ead","filters":{"topic":"Smart Grid Energy Management"},"cohort_total":1506,"direct_labels_cover":1,"predictions_cover":1506,"exported":1506,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7435e0e23ead","api":"https://metacan.xera.ac/api/v1/cohort?topic=Smart+Grid+Energy+Management"},"results":[{"id":"W1181877844","doi":"","title":"Economical and Reliable Method of Water Purification","year":2014,"lang":"en","type":"article","venue":"Asian Journal of Water Environment and Pollution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Boiling; Process engineering; Work (physics); Simplicity; Process (computing); Computer science; Environmental science; Current (fluid); Portable water purification; Biochemical engineering; Environmental engineering; Engineering; Mechanical engineering; Chemistry","score_opus":0.004818241127481549,"score_gpt":0.1694440748232571,"score_spread":0.16462583369577555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1181877844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9343295,0.000081670994,0.063135445,0.0012828218,0.0001881342,0.000045672976,7.226562e-7,0.000007687615,0.0009283039],"genre_scores_gemma":[0.9950387,0.00017588442,0.0045535653,0.000016647698,0.00010155669,0.0000010465199,0.0000027198025,0.000009154135,0.00010071191],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995196,0.000027636095,0.00022653305,0.000061308645,0.00006007643,0.00010483304],"domain_scores_gemma":[0.9998399,0.000002633312,0.000033367298,0.000074693475,0.0000027800916,0.000046644185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034829153,0.00006904517,0.00011782909,0.000069090136,0.000020692996,0.000011164602,0.00003861569,0.00003526367,0.00005464321],"category_scores_gemma":[0.0000010476714,0.00004579469,0.00002468009,0.000006668834,0.000025839345,0.00012659679,0.000019420155,0.000054604836,0.000011130942],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093407594,0.00007110334,0.0059981286,0.00016247453,0.00030314762,0.0000031427362,0.0029367919,0.27513888,0.6166618,0.0016884698,0.0012622098,0.095680416],"study_design_scores_gemma":[0.0012329563,0.00029876377,0.045259267,0.000039048682,0.00014924537,0.00007366165,0.00014515311,0.027404543,0.7720912,0.0023678383,0.1506664,0.00027194162],"about_ca_topic_score_codex":0.0000013179055,"about_ca_topic_score_gemma":1.4644624e-7,"teacher_disagreement_score":0.24773435,"about_ca_system_score_codex":0.00002789265,"about_ca_system_score_gemma":5.5953006e-7,"threshold_uncertainty_score":0.18674533},"labels":[],"label_agreement":null},{"id":"W1189151426","doi":"10.1016/j.ijepes.2015.07.035","title":"Home energy management incorporating operational priority of appliances","year":2015,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Demand response; Electricity; Scheduling (production processes); Load management; Energy management; Computer science; Electricity market; Operations research; Reliability (semiconductor); Load shifting; Energy consumption; Environmental economics; Operational costs; Consumption (sociology); Energy management system; Reliability engineering; Business; Operations management; Energy (signal processing); Engineering; Economics; Electrical engineering; Power (physics)","score_opus":0.010324271663768498,"score_gpt":0.22221719816217655,"score_spread":0.21189292649840805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1189151426","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062770724,0.010240863,0.8275848,0.00054864155,0.025787735,0.00021488382,0.000023662838,0.00023922943,0.07258944],"genre_scores_gemma":[0.9971853,0.00017050389,0.0011937406,0.00007524649,0.0009323341,0.000014631566,0.0000107214755,0.000029847344,0.00038770775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972839,0.0000732413,0.0009843794,0.00015764307,0.0012811022,0.0002197364],"domain_scores_gemma":[0.9985473,0.00006307752,0.0003702805,0.00015584817,0.0006920263,0.0001714484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004667546,0.00020061579,0.0003579508,0.00046851413,0.000023492692,0.00008849317,0.0006665871,0.00008021384,0.000014159619],"category_scores_gemma":[0.000032081978,0.00018277824,0.0001283489,0.0003411939,0.000036801994,0.0003237504,0.000086447406,0.00014447338,0.000004230252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009354797,0.00014362922,0.0013507605,0.00001758047,0.001024043,0.0001810863,0.000052556577,0.69031185,0.00069611403,0.28694013,0.015973823,0.0032149043],"study_design_scores_gemma":[0.0050458075,0.0009430222,0.0029780262,0.0005000852,0.00016813168,0.00071552984,0.00035715275,0.35981363,0.006898969,0.0076080873,0.61373335,0.001238207],"about_ca_topic_score_codex":0.000113684466,"about_ca_topic_score_gemma":0.000008717333,"teacher_disagreement_score":0.93441457,"about_ca_system_score_codex":0.0004399508,"about_ca_system_score_gemma":0.00007466158,"threshold_uncertainty_score":0.74534804},"labels":[],"label_agreement":null},{"id":"W122953829","doi":"","title":"Emission Impossible: Positively Shocking Solutions for Abating Greenhouse Gas Emissions from Canada’s Electric Power Industry","year":2013,"lang":"en","type":"article","venue":"Summit (Simon Fraser University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Electric power industry; Electric power; Environmental science; Power (physics); Engineering; Electricity; Electrical engineering; Physics; Thermodynamics; Ecology","score_opus":0.010068169989135928,"score_gpt":0.18215736353649128,"score_spread":0.17208919354735536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W122953829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97980493,0.00013026319,0.007275837,0.00037571276,0.00050359656,0.00040694085,0.00008941775,0.00045407898,0.010959195],"genre_scores_gemma":[0.9973418,0.000035447112,0.00053621095,0.000091848044,0.00012113252,0.0000072241646,0.00007417941,0.00006131594,0.0017308453],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998451,0.00003686901,0.00021330455,0.00035561604,0.00023847076,0.00070472056],"domain_scores_gemma":[0.9990381,0.00014830787,0.00006602607,0.00032414653,0.00010351395,0.00031992455],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000066573826,0.00028036718,0.00021498205,0.00035285213,0.00050820474,0.00006392909,0.0003796841,0.00025811588,0.00034520193],"category_scores_gemma":[0.000046914498,0.0003286777,0.00009059561,0.0007278102,0.000020855205,0.0004244684,0.00016051799,0.0004570264,0.000012418971],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041535557,0.00011894982,0.1675864,0.000063794745,0.0005330069,0.00015520811,0.000089190165,0.12912148,0.0047501232,0.0005146221,0.6911176,0.0059080888],"study_design_scores_gemma":[0.00498693,0.00029817745,0.053632975,0.0007114904,0.00065891497,1.3405875e-7,0.03344289,0.3169611,0.037728135,0.00052443,0.5474718,0.0035830003],"about_ca_topic_score_codex":0.12738384,"about_ca_topic_score_gemma":0.46227193,"teacher_disagreement_score":0.3348881,"about_ca_system_score_codex":0.00089779403,"about_ca_system_score_gemma":0.00025731942,"threshold_uncertainty_score":0.99991655},"labels":[],"label_agreement":null},{"id":"W1272474793","doi":"10.1007/s12053-014-9306-2","title":"Nonintrusive load monitoring (NILM) performance evaluation","year":2014,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Popularity; Power (physics); Computer science; Process (computing); Electricity meter; Metre; SIGNAL (programming language); Reliability engineering; Engineering","score_opus":0.007915506415731681,"score_gpt":0.2043547913776673,"score_spread":0.1964392849619356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1272474793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80082494,0.00034924957,0.048655946,0.000021787557,0.0032133702,0.00007240233,3.288131e-7,0.00047538796,0.14638658],"genre_scores_gemma":[0.9982002,0.00008292146,0.00047713929,0.000022412985,0.0006562554,0.00006712148,0.000004181891,0.000034753175,0.00045506452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864286,0.000036332807,0.00019811309,0.00022458244,0.0005619543,0.0003361502],"domain_scores_gemma":[0.99942553,0.00003620574,0.00003024879,0.0003470051,0.00009510456,0.000065917324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046850168,0.00017345017,0.00012627302,0.00010633351,0.00010633585,0.00003550984,0.00022772026,0.000055319648,0.00009583576],"category_scores_gemma":[0.00005127091,0.00017829597,0.000041033953,0.00028881134,0.000025830903,0.00014188576,0.00005167569,0.0000835414,0.00010137403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016597845,0.000013382638,0.0005081082,0.0000099544895,0.000011667176,5.295912e-7,0.00009231156,0.9322038,0.0008742709,0.001205741,0.00035842098,0.06472012],"study_design_scores_gemma":[0.0002827129,0.000043929136,0.0063976077,0.00002859347,0.000019042105,0.0000015461654,0.00002100538,0.9356652,0.025011789,0.000036970574,0.032263152,0.0002284715],"about_ca_topic_score_codex":0.000027471619,"about_ca_topic_score_gemma":0.0000062709505,"teacher_disagreement_score":0.19737521,"about_ca_system_score_codex":0.00029997408,"about_ca_system_score_gemma":0.000025382918,"threshold_uncertainty_score":0.7270699},"labels":[],"label_agreement":null},{"id":"W140534614","doi":"10.1007/978-3-319-11032-5_8","title":"Computing a Model for Asset Management with Risk","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brock University","funders":"","keywords":"Asset (computer security); Computer science; Asset management; Operations research; Risk analysis (engineering); Actuarial science; Business; Engineering; Finance; Computer security","score_opus":0.009930648884383676,"score_gpt":0.17728258087857135,"score_spread":0.16735193199418769,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W140534614","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000038352314,0.000020002879,0.51912946,0.000009279723,0.00013928987,0.0002898646,0.000011656319,0.0003864518,0.48001012],"genre_scores_gemma":[0.010301722,0.00014705502,0.11896847,0.0001308193,0.00034733384,0.0000678789,0.00012368441,0.00032047371,0.86959255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988937,0.000002637028,0.00025018767,0.00034050827,0.00021933427,0.00029366967],"domain_scores_gemma":[0.99931026,0.00003728996,0.000070204784,0.00048744242,0.000030442909,0.00006435204],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015019736,0.00040308188,0.0003296405,0.00016729804,0.00005775398,0.00004426529,0.00022503374,0.00012673406,0.000055407618],"category_scores_gemma":[0.000001120996,0.0003598291,0.00010672943,0.000015977092,0.000017728307,0.000025335854,0.00010583413,0.00017138336,0.000072678355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004261461,0.0000015946755,0.0000016120345,0.00020653105,0.00038884208,0.0000027741437,0.0000078340845,0.6936492,8.774539e-8,0.27056774,0.030014712,0.005154852],"study_design_scores_gemma":[0.00030852106,0.000022858028,0.0000070474166,0.00009623616,0.00019479386,8.6219495e-7,0.0000024306426,0.7558615,0.0000019082354,0.0024723548,0.2406589,0.00037256902],"about_ca_topic_score_codex":0.000003450918,"about_ca_topic_score_gemma":0.000042421736,"teacher_disagreement_score":0.40016103,"about_ca_system_score_codex":0.00010878951,"about_ca_system_score_gemma":0.0000040504915,"threshold_uncertainty_score":0.9998854},"labels":[],"label_agreement":null},{"id":"W1491459318","doi":"10.20381/ruor-5165","title":"Adaptive Systems for Smart Buildings Utilizing Wireless Sensor Networks and Artificial Intelligence","year":2012,"lang":"en","type":"dissertation","venue":"uO Research (University of Ottawa)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Reinforcement learning; Wireless sensor network; Computer science; Thermostat; Schedule; Artificial intelligence; Wireless; Distributed computing; Building automation; Engineering; Real-time computing; Control engineering; Computer network; Telecommunications; Electrical engineering","score_opus":0.06570154163195144,"score_gpt":0.28100875918402,"score_spread":0.21530721755206858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1491459318","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5600537,0.0033229692,0.3604247,0.00012381437,0.0054293033,0.0039054155,0.00015971856,0.0006139061,0.06596645],"genre_scores_gemma":[0.99337894,0.0009538179,0.0011886603,0.0000010876397,0.00029998907,0.000009060138,0.00019533809,0.00007209817,0.003900998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831223,0.0000828369,0.0001966121,0.00033730612,0.00047132856,0.0005996867],"domain_scores_gemma":[0.9988674,0.00029355072,0.000084037274,0.00026292406,0.00032585746,0.0001662291],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00087708654,0.00022089964,0.0003667234,0.00057850324,0.0002943457,0.00005020948,0.00038263857,0.000301357,0.000028976268],"category_scores_gemma":[0.00003342237,0.00029727188,0.00009400895,0.00039150383,0.00012957337,0.00020792506,0.00009738106,0.0004935019,0.000010966425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028878322,0.00020912314,0.0020705936,0.0071575157,0.0018101647,0.00010055725,0.0049623,0.48130125,0.002600521,0.37142923,0.018611057,0.10945891],"study_design_scores_gemma":[0.00019260593,0.00016828108,0.0038780374,0.00057528954,0.0001383701,0.0000026740254,0.039204746,0.9202566,0.00067850604,0.00020473418,0.034104917,0.00059523055],"about_ca_topic_score_codex":0.00034156503,"about_ca_topic_score_gemma":0.001111893,"teacher_disagreement_score":0.43895537,"about_ca_system_score_codex":0.00019890517,"about_ca_system_score_gemma":0.000031280124,"threshold_uncertainty_score":0.99994797},"labels":[],"label_agreement":null},{"id":"W1493111803","doi":"10.5772/17297","title":"Demand Management and Wireless Sensor Networks in the Smart Grid","year":2011,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Environmental economics; Inefficiency; Demand response; Grid; Smart grid; Resilience (materials science); Electricity; Greenhouse gas; Electricity generation; Population; Electricity demand; Business; Engineering; Natural resource economics; Power (physics); Electrical engineering; Economics; Geography; Market economy","score_opus":0.01363101345548112,"score_gpt":0.1819275154901808,"score_spread":0.16829650203469967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493111803","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005668313,0.00052173255,0.011230133,0.000019215702,0.0010410543,0.0005785837,0.0000048320553,0.00026253625,0.98577505],"genre_scores_gemma":[0.4849345,0.0023092062,0.0007138161,0.00071264664,0.0012562851,0.0004170947,0.000042643456,0.0004518171,0.509162],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875385,0.000017518243,0.00034808516,0.00033556888,0.00021145027,0.00033354995],"domain_scores_gemma":[0.9992462,0.0000460331,0.000052843632,0.00058678864,0.00001620127,0.000051952262],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002630789,0.00043153245,0.0003232489,0.000238754,0.00004502987,0.00005804438,0.0003831135,0.00025725513,0.0000545404],"category_scores_gemma":[0.0000012024755,0.0003589771,0.00008246785,0.000018368406,0.00009753288,0.000025004932,0.00021334663,0.0005573102,0.000043557786],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018761067,0.000083576,0.00038959744,0.0028026195,0.0043606805,0.0052537615,0.0035317924,0.015478087,0.00028934132,0.60066104,0.06917739,0.2977845],"study_design_scores_gemma":[0.00048735205,0.000056497593,0.0004066627,0.00076748047,0.00021518677,0.000051427498,0.00008156376,0.0027935554,0.00044018132,0.008188034,0.9855594,0.0009526486],"about_ca_topic_score_codex":0.000027200336,"about_ca_topic_score_gemma":0.00019173634,"teacher_disagreement_score":0.916382,"about_ca_system_score_codex":0.000078098565,"about_ca_system_score_gemma":0.000002739852,"threshold_uncertainty_score":0.9998862},"labels":[],"label_agreement":null},{"id":"W1503631732","doi":"10.4271/2008-01-3004","title":"3 Load Cell Tumble Meter Development","year":2008,"lang":"en","type":"article","venue":"SAE technical papers on CD-ROM/SAE technical paper series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Chrysler (Canada)","funders":"","keywords":"Metre; Computer science; Physics","score_opus":0.012086059073909165,"score_gpt":0.2007219074593392,"score_spread":0.18863584838543004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1503631732","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5993439,0.000898342,0.0000149433645,0.0009514799,0.0010014069,0.0010217978,0.000019311741,0.009174147,0.38757467],"genre_scores_gemma":[0.9819022,0.0006637708,0.012174259,0.0012689144,0.00023142224,0.00054611085,0.000041028332,0.0002573657,0.0029149198],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9947717,0.0000788106,0.0012209483,0.001158412,0.0013927558,0.0013773385],"domain_scores_gemma":[0.9973982,0.00022703042,0.00011709396,0.0016551131,0.00010330307,0.0004992392],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0005058534,0.0010317909,0.00095748145,0.0002735643,0.00045175882,0.00008083649,0.0012797656,0.0006944714,0.0009852384],"category_scores_gemma":[0.00017399117,0.000964206,0.00042075454,0.0008503925,0.00058255653,0.00047670797,0.0005963301,0.0011726774,0.0010892461],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000871615,0.00030889414,0.00017622397,0.00010204987,0.00010212647,0.00020718672,0.00006497061,0.00207483,0.95311344,0.001391238,0.040442444,0.0019294437],"study_design_scores_gemma":[0.00058450404,0.00026413228,0.61487037,0.000079395744,0.000043896423,0.00007283541,0.000028299271,4.1900898e-7,0.0022389481,0.00014955385,0.38081297,0.0008546455],"about_ca_topic_score_codex":0.00002685457,"about_ca_topic_score_gemma":0.020170419,"teacher_disagreement_score":0.9508745,"about_ca_system_score_codex":0.0010110924,"about_ca_system_score_gemma":0.00013971097,"threshold_uncertainty_score":0.999928},"labels":[],"label_agreement":null},{"id":"W1504815797","doi":"10.1109/iccchinaw.2014.7107861","title":"Optimizing residential energy consumption: the need for pareto optimality","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Pareto principle; Smart grid; Energy consumption; Multi-objective optimization; Profit (economics); Pareto optimal; Consumption (sociology); Grid; Simple (philosophy); Mathematical optimization; Operations research; Engineering; Machine learning; Economics; Microeconomics","score_opus":0.01608750721372897,"score_gpt":0.21762896903361617,"score_spread":0.2015414618198872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1504815797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067826007,0.00010220419,0.96283126,0.000556174,0.0010802774,0.00012727847,0.000001931954,0.00051430444,0.028003944],"genre_scores_gemma":[0.9834295,0.00004735749,0.014374653,0.00037878205,0.0005611795,0.00014545218,0.000014392028,0.000036099023,0.0010126048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992774,0.000029057059,0.00018295717,0.00014865703,0.0001240145,0.00023791127],"domain_scores_gemma":[0.9994328,0.00013071227,0.000018871799,0.0003449776,0.000026257385,0.000046350684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002805352,0.00012414495,0.00011556404,0.00003975595,0.00010825831,0.000074308344,0.00020429498,0.00004402813,0.00019341825],"category_scores_gemma":[0.000023608614,0.000095762494,0.000069657355,0.00006420288,0.00003271258,0.00008890783,0.00005870276,0.000047541474,0.000023516051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000104369465,0.0000054575244,0.00011222122,0.000031531115,0.00006806255,4.297324e-7,0.000037813417,0.8833893,0.0002536715,0.07255606,0.041910864,0.0016241603],"study_design_scores_gemma":[0.00045603895,0.000019918585,0.0011154237,0.000008900103,0.000037598722,0.0000016955055,0.000047304675,0.7660169,0.004371515,0.0004905844,0.22722444,0.00020967874],"about_ca_topic_score_codex":0.000060564205,"about_ca_topic_score_gemma":0.000112123926,"teacher_disagreement_score":0.9766469,"about_ca_system_score_codex":0.000038316142,"about_ca_system_score_gemma":0.0000034576674,"threshold_uncertainty_score":0.39050812},"labels":[],"label_agreement":null},{"id":"W1510732983","doi":"10.1109/greentech.2015.29","title":"Fairness-Aware Game Theoretic Approach for Demand Response in Microgrids","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Demand response; Shapley value; Computer science; Smart grid; Context (archaeology); Grid; Game theory; Distributed generation; Electric power system; Cooperative game theory; Mathematical optimization; Operations research; Power (physics); Electricity; Microeconomics; Economics","score_opus":0.01856743231817886,"score_gpt":0.22301843564815957,"score_spread":0.2044510033299807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1510732983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22781447,0.00020013815,0.75728494,0.000108650136,0.00031358917,0.00038238874,0.0000037947677,0.00038756445,0.013504488],"genre_scores_gemma":[0.99191606,0.000008871892,0.0069708806,0.000056637215,0.00007708424,0.0001844654,0.000015508083,0.000041791056,0.0007286948],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992457,0.000042076626,0.00016855361,0.00017156413,0.00010428919,0.00026781557],"domain_scores_gemma":[0.9995634,0.00007101467,0.000009804634,0.00025014672,0.000025501793,0.00008016567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006424911,0.00013601234,0.00014433438,0.0001386442,0.000010417377,0.000029438437,0.0001597493,0.00006162719,0.000017895369],"category_scores_gemma":[0.00004781994,0.00012364199,0.000038250833,0.00017084504,0.00002883927,0.000074087424,0.00004614794,0.00006244781,0.000019156792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002916448,0.000040099836,0.0006170126,0.00008559326,0.000027262044,0.0000057690186,0.00039654592,0.9822156,0.00022005952,0.005993675,0.009747442,0.0003593222],"study_design_scores_gemma":[0.0017344742,0.000104437626,0.002721704,0.000015585156,0.000017711785,0.0000058852,0.00089398306,0.9672342,0.0026664364,0.0015873577,0.022656623,0.00036158462],"about_ca_topic_score_codex":0.000007712325,"about_ca_topic_score_gemma":0.00000658566,"teacher_disagreement_score":0.7641016,"about_ca_system_score_codex":0.000113019276,"about_ca_system_score_gemma":0.000013587215,"threshold_uncertainty_score":0.5041974},"labels":[],"label_agreement":null},{"id":"W1518849528","doi":"10.1109/hicss.2015.313","title":"Optimization of Customer Subscription Rates to Electric Utility Tariffs","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Laboratory Directed Research and Development; Pacific Northwest National Laboratory; University of Victoria; Battelle; U.S. Department of Energy","keywords":"Tariff; Electricity; Computer science; Electricity price; Environmental economics; Microeconomics; Operations research; Business; Mathematical optimization; Economics; Engineering; International economics; Electrical engineering","score_opus":0.020774310452331687,"score_gpt":0.21969815257612516,"score_spread":0.19892384212379347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1518849528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16696776,0.0000858046,0.75772864,0.000098387245,0.0006180855,0.00019952995,7.27523e-7,0.00042081292,0.07388026],"genre_scores_gemma":[0.9921371,0.000011181423,0.0072572287,0.00005104059,0.00004177167,0.000012810175,0.00000884908,0.000013643876,0.00046637544],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951637,0.000011811381,0.00013746724,0.00008897181,0.00012396055,0.0001214108],"domain_scores_gemma":[0.9996956,0.0000062079857,0.000011050433,0.00015275672,0.00006709506,0.000067309804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013990609,0.00007129685,0.000084836116,0.00013311642,0.000007946609,0.000009729282,0.00007010975,0.000030162353,0.00013311762],"category_scores_gemma":[0.000023611343,0.00006983405,0.00001699905,0.0004140674,0.000004160835,0.00009952641,0.000017250151,0.000031466134,0.00007868906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055237365,0.000011426956,0.0009803913,0.000009531534,0.000012360926,2.0420934e-7,0.000046258298,0.9738061,0.00086100824,0.00043847624,0.023316372,0.0005123793],"study_design_scores_gemma":[0.00016168901,0.000024901761,0.004705148,0.0000029225478,0.000010027933,2.881473e-7,0.000038013008,0.96184707,0.0198012,0.00003183635,0.013274887,0.00010202993],"about_ca_topic_score_codex":0.000078063684,"about_ca_topic_score_gemma":0.000019650319,"teacher_disagreement_score":0.8251693,"about_ca_system_score_codex":0.000066438566,"about_ca_system_score_gemma":0.0000071202735,"threshold_uncertainty_score":0.284775},"labels":[],"label_agreement":null},{"id":"W1526600169","doi":"10.1109/ihtc.2014.7147535","title":"A Consumer Bill of Rights for Energy Conservation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; University of British Columbia; Government of British Columbia; Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada; University of British Columbia; U.S. Consumer Product Safety Commission","keywords":"Energy conservation; Environmental economics; Work (physics); Purchasing; Business; Energy consumption; Government (linguistics); Consumption (sociology); Power (physics); Purchasing power; Economics; Marketing; Engineering","score_opus":0.007114710934369648,"score_gpt":0.1772176588999333,"score_spread":0.17010294796556363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1526600169","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035751466,0.00004308197,0.8947256,0.0002012979,0.0006199625,0.000103496575,0.0000029337464,0.00029913822,0.06825301],"genre_scores_gemma":[0.9942291,0.000005558132,0.004757768,0.00014374753,0.000049776063,0.000032928536,0.000009669664,0.000011181568,0.0007602808],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996855,0.0000055017204,0.00011552105,0.000061045816,0.000049037943,0.000083384126],"domain_scores_gemma":[0.9997486,0.00006500113,0.000013050702,0.00012568982,0.000029161067,0.000018492272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058521593,0.000055097174,0.000080236976,0.00004835784,0.000012293351,0.000004058854,0.000048106267,0.00002439018,0.000051564588],"category_scores_gemma":[0.000009144382,0.000040503633,0.000025671448,0.00005076862,0.000012553021,0.000035051587,0.000008264136,0.000009709491,0.0000055059727],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001101273,0.000025515834,0.000628964,0.000079146885,0.00014281603,2.1686691e-7,0.000033056338,0.10302619,0.0041574356,0.64185166,0.24641986,0.0036241156],"study_design_scores_gemma":[0.0002658402,0.000016785667,0.00035625772,0.000005209393,0.000010422999,1.776767e-7,0.0000022495155,0.3220775,0.0298484,0.005525292,0.6418194,0.000072411814],"about_ca_topic_score_codex":0.0004540496,"about_ca_topic_score_gemma":0.00024428373,"teacher_disagreement_score":0.9584776,"about_ca_system_score_codex":0.000010221517,"about_ca_system_score_gemma":0.0000016056815,"threshold_uncertainty_score":0.16516903},"labels":[],"label_agreement":null},{"id":"W1532109353","doi":"10.1002/wene.120","title":"Who gains from hourly time‐of‐use retail prices on electricity? An analysis of consumption profiles for categories of Danish electricity customers","year":2014,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Electricity; Consumption (sociology); Danish; Environmental economics; Power consumption; Electricity retailing; Environmental science; Business; Agricultural economics; Electricity market; Economics; Engineering; Power (physics); Electrical engineering","score_opus":0.020990381564097545,"score_gpt":0.24171783968628394,"score_spread":0.2207274581221864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1532109353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9548631,0.00395584,0.040271387,0.000023768614,0.00008323212,0.00034556398,0.000103144295,0.000041653566,0.0003123163],"genre_scores_gemma":[0.9763768,0.021819765,0.0010881821,0.000022552154,0.000051695606,0.00013035473,0.00035787813,0.000033466433,0.00011935119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837947,0.00012516427,0.00071577955,0.0003565271,0.00019605977,0.00022702962],"domain_scores_gemma":[0.9989235,0.000170762,0.00033269866,0.00047944766,0.000016675509,0.000076929115],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036742928,0.00028134882,0.0008903421,0.000314088,0.00006368336,0.0000132290525,0.00020437817,0.00009491094,0.000063688494],"category_scores_gemma":[0.000018995668,0.00024673154,0.00022667495,0.00025633123,0.00011865279,0.0002047613,0.00012751139,0.0000724989,0.000002456307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049178756,0.0007605434,0.026211064,0.0012404002,0.00388161,0.0000020045507,0.002258722,0.835013,0.032463517,0.005130821,0.0022948731,0.090251684],"study_design_scores_gemma":[0.0011111292,0.0028346435,0.15161173,0.00084665697,0.0047029806,0.0000013480927,0.00014333766,0.7311951,0.06349761,0.00060736435,0.042229712,0.0012183818],"about_ca_topic_score_codex":0.000073296644,"about_ca_topic_score_gemma":0.00007418646,"teacher_disagreement_score":0.12540066,"about_ca_system_score_codex":0.00009346895,"about_ca_system_score_gemma":0.000003931647,"threshold_uncertainty_score":0.9999985},"labels":[],"label_agreement":null},{"id":"W1542090993","doi":"10.1109/ccece.2015.7129380","title":"Electrical grid peak reduction with efficient and flexible automated demand response scheduling","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Electricity; Smart grid; Computer science; Scheduling (production processes); Reduction (mathematics); Incentive; Grid; Energy consumption; Consumption (sociology); Response time; Load management; Real-time computing; Distributed computing; Mathematical optimization; Electrical engineering; Microeconomics; Economics; Engineering; Mathematics; Operating system","score_opus":0.01113297043383362,"score_gpt":0.21400129951788535,"score_spread":0.20286832908405172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1542090993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9620262,0.00023326273,0.030778004,0.00012523065,0.00034705346,0.000119088974,3.345853e-7,0.0023961968,0.003974674],"genre_scores_gemma":[0.9917544,0.000010205034,0.0077025625,0.000020949323,0.000117046715,0.000016066491,0.0000033970434,0.0000287154,0.00034661614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926275,0.00003718563,0.00012354285,0.0001713155,0.00018101101,0.00022419509],"domain_scores_gemma":[0.9996409,0.000023120483,0.00001291689,0.0001559525,0.000037862,0.00012925257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036741467,0.00012199105,0.00010708556,0.00015160802,0.00004105653,0.000045602723,0.00005298654,0.00004203813,0.0000065618974],"category_scores_gemma":[0.000030376272,0.000100899786,0.0000115230205,0.00032935603,0.000023367944,0.00006697547,0.00002868951,0.00008176731,0.000024639197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020620579,0.000015496498,0.000064558764,0.000009056926,0.00003052654,0.0000073553647,0.00007953805,0.9918909,0.002857104,0.0002504928,0.0044319583,0.0001568129],"study_design_scores_gemma":[0.00059583975,0.00012405931,0.002575446,0.000013727236,0.000019065172,0.000043962395,0.00010257199,0.9843054,0.008712053,0.000008561155,0.0033354962,0.00016384151],"about_ca_topic_score_codex":0.000010008882,"about_ca_topic_score_gemma":0.0000014624361,"teacher_disagreement_score":0.029728286,"about_ca_system_score_codex":0.00012245675,"about_ca_system_score_gemma":0.000020702599,"threshold_uncertainty_score":0.4114574},"labels":[],"label_agreement":null},{"id":"W1549040031","doi":"","title":"Proceedings of the Fourth ACM Workshop on Embedded Sensing Systems for Energy-Efficiency in Buildings","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variety (cybernetics); Architectural engineering; Globe; Pleasure; Efficient energy use; Electricity; Domain (mathematical analysis); Energy (signal processing); Computer science; Engineering; Engineering management; Electrical engineering; Psychology","score_opus":0.017131028861628813,"score_gpt":0.22088458021182295,"score_spread":0.20375355135019413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1549040031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93147546,0.00025514944,0.033971794,0.0001221086,0.0021398847,0.0004704594,0.0000012919169,0.000273562,0.031290263],"genre_scores_gemma":[0.9965083,0.000022054819,0.0025324516,0.000046173238,0.00022111264,0.000028597748,5.596139e-7,0.000037678783,0.0006030815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990367,0.000005003239,0.00025264398,0.00013526675,0.00018990271,0.0003804456],"domain_scores_gemma":[0.99953985,0.00010066304,0.000047118374,0.00022888379,0.00003858218,0.000044900276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031421878,0.000148837,0.00017026646,0.00013479334,0.00003572775,0.000028562155,0.00026995954,0.000064131724,0.0000036265756],"category_scores_gemma":[0.00011309116,0.000109168606,0.00006211415,0.00037065212,0.000017809214,0.00012783353,0.00009547735,0.00007727153,0.0000017315402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018530138,0.00008280192,0.0016710416,0.0002583623,0.00006075656,2.8693844e-7,0.0011455535,0.834356,0.0082098525,0.13667274,0.015079632,0.0024444137],"study_design_scores_gemma":[0.0010157549,0.00005045733,0.0023649612,0.0006959179,0.000052839587,0.000006997467,0.0036591727,0.8859495,0.05401692,0.00022828692,0.05131479,0.00064440904],"about_ca_topic_score_codex":0.000031065225,"about_ca_topic_score_gemma":0.0000075223857,"teacher_disagreement_score":0.13644445,"about_ca_system_score_codex":0.00010560281,"about_ca_system_score_gemma":0.000003867052,"threshold_uncertainty_score":0.44517666},"labels":[],"label_agreement":null},{"id":"W1569380606","doi":"","title":"Storage-based smart grid communication framework","year":2012,"lang":"en","type":"article","venue":"World Congress on Sustainable Technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Smart grid; Computer science; Grid; Distributed computing; Renewable energy; Distributed generation; Energy storage; Demand response; Stochastic optimization; Optimization problem; Mathematical optimization; Electrical engineering; Engineering; Electricity; Power (physics); Algorithm","score_opus":0.009465052008330081,"score_gpt":0.22223301254336134,"score_spread":0.21276796053503125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1569380606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37542766,0.042271994,0.06330565,0.025240894,0.021034623,0.0057086283,0.00004883425,0.12199831,0.3449634],"genre_scores_gemma":[0.99094546,0.00015618747,0.004100932,0.00014673758,0.000072765935,0.00039624213,0.000016638705,0.000067812914,0.0040972005],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99836856,0.000042776865,0.00024864715,0.00020908986,0.00025351066,0.00087741186],"domain_scores_gemma":[0.99804646,0.00023968065,0.00006424302,0.0015053281,0.00008678043,0.00005751254],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003492959,0.0002986229,0.00025454516,0.0007341551,0.00021096964,0.00009945026,0.0008145998,0.0001874073,0.00007749252],"category_scores_gemma":[0.00024165635,0.000300889,0.00006624326,0.0010154622,0.00019094507,0.0003339994,0.00030001518,0.0005746327,0.00010701433],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003959521,0.00019229692,0.011042607,0.00039040943,0.00015129473,0.000051180523,0.00009250548,0.24090047,0.000031320727,0.59786695,0.13679487,0.012446482],"study_design_scores_gemma":[0.0003596481,0.000045638193,0.0021796292,0.00015689919,0.000034404453,0.0000012036434,0.00352815,0.0069792415,0.0112647815,0.0050569284,0.96978444,0.0006090571],"about_ca_topic_score_codex":0.000023994295,"about_ca_topic_score_gemma":0.000017787715,"teacher_disagreement_score":0.8329896,"about_ca_system_score_codex":0.0004676236,"about_ca_system_score_gemma":0.000015834115,"threshold_uncertainty_score":0.9999443},"labels":[],"label_agreement":null},{"id":"W1588980792","doi":"10.1109/isgt.2015.7131790","title":"Distributed sustainable generation dispatch via evolutionary games","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Scalability; Economic dispatch; Overhead (engineering); Provisioning; Smart grid; Grid; Distributed computing; Carbon footprint; Variable (mathematics); Electric power system; Wind power; Distributed generation; Mathematical optimization; Power (physics); Renewable energy; Engineering; Telecommunications; Ecology","score_opus":0.012771717211714502,"score_gpt":0.1937124536605467,"score_spread":0.1809407364488322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1588980792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06870873,0.0003314693,0.89912057,0.0003826252,0.0011623063,0.00017902837,0.000005496662,0.0010223819,0.029087378],"genre_scores_gemma":[0.9906313,0.00001196814,0.0020305428,0.000038614417,0.00030990172,0.000044443103,0.00023327897,0.0000207461,0.0066792495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937594,0.000011810417,0.0001146116,0.00011170954,0.00014982237,0.00023609064],"domain_scores_gemma":[0.9996383,0.00000610394,0.000008378428,0.0001856543,0.00007119901,0.000090374306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088833825,0.00009690643,0.00007347337,0.000051534196,0.000034785164,0.00002779312,0.0000797445,0.000036498568,0.00008408468],"category_scores_gemma":[0.000018033896,0.00009436137,0.000021843258,0.0001783039,0.000011453245,0.00020891358,0.00005132476,0.000042694064,0.00009841224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013324351,0.0000106866855,0.0007023947,0.000010500143,0.000017205284,0.000008052853,0.000018767993,0.63439757,0.00014062245,0.0049188584,0.35955155,0.0002224268],"study_design_scores_gemma":[0.00020510328,0.000015718315,0.0027589696,0.0000014876578,0.000008920395,0.0000024646008,0.00019301011,0.7928288,0.0012010391,0.00053188356,0.20210141,0.00015122561],"about_ca_topic_score_codex":0.00012157833,"about_ca_topic_score_gemma":0.000027596438,"teacher_disagreement_score":0.9219225,"about_ca_system_score_codex":0.00028335562,"about_ca_system_score_gemma":0.000013052707,"threshold_uncertainty_score":0.3847945},"labels":[],"label_agreement":null},{"id":"W1608132282","doi":"10.1109/icde.2015.7113405","title":"SMAS: A smart meter data analytics system","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart meter; Analytics; Computer science; Electricity; Electricity meter; Metre; Data analysis; Big data; Domain (mathematical analysis); Smart grid; Data science; Database; Data mining; Engineering; Electrical engineering","score_opus":0.10085822949734728,"score_gpt":0.2364757872674757,"score_spread":0.1356175577701284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1608132282","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008691823,0.00024099989,0.26041526,0.00014223032,0.0028438272,0.0001679163,0.000019529518,0.0022129202,0.7252655],"genre_scores_gemma":[0.9884922,0.000006422759,0.008511089,0.00007435716,0.00024950074,0.00000922886,0.00006889613,0.0000404248,0.0025479053],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928766,0.000012002145,0.0001592481,0.00016786321,0.0001857145,0.00018750313],"domain_scores_gemma":[0.99882233,0.000014347544,0.0000101335745,0.0010141222,0.000024403587,0.00011468809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026215124,0.00010923035,0.00012578742,0.00007623161,0.000011811355,0.000043540746,0.00042339385,0.000033124048,0.00003507153],"category_scores_gemma":[0.000017811026,0.00009632646,0.00001903893,0.00016171247,0.000008369042,0.00016471946,0.00025236208,0.00005156873,0.00045168604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003921841,0.00001639867,0.0014584376,0.00014771477,0.00035187838,0.00004478503,0.00007343367,0.28758737,0.000036283796,0.008003966,0.7007518,0.0015240497],"study_design_scores_gemma":[0.00018890697,0.000008252339,0.0002454931,0.0000108520735,0.000043081902,0.000004394879,0.00023230344,0.76013917,0.00016033418,0.000011099961,0.23881775,0.00013834152],"about_ca_topic_score_codex":0.00006077306,"about_ca_topic_score_gemma":0.00008053256,"teacher_disagreement_score":0.97980034,"about_ca_system_score_codex":0.00010904674,"about_ca_system_score_gemma":0.000008363503,"threshold_uncertainty_score":0.58056605},"labels":[],"label_agreement":null},{"id":"W1609312154","doi":"10.1109/pess.2002.1043647","title":"Web-based transaction operational feasibility analysis in electricity markets","year":2003,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Database transaction; Computer science; Electricity; Web application; Transaction processing; Architecture; Electricity market; Database; Distributed computing; World Wide Web; Engineering","score_opus":0.009416826029162387,"score_gpt":0.2104299257049419,"score_spread":0.20101309967577952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1609312154","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6089448,0.000022402304,0.35677072,0.00004560983,0.00011482895,0.000115438634,0.0000015000178,0.00018779069,0.033796936],"genre_scores_gemma":[0.9976913,0.000006712538,0.0020085091,0.00007015081,0.000009221983,0.000023061722,0.000011977772,0.0000085651145,0.00017055355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993085,0.00006261598,0.00017021787,0.0001603077,0.00014135322,0.0001569681],"domain_scores_gemma":[0.99974376,0.000033192977,0.0000067704964,0.00016450069,0.000017323346,0.00003446405],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00032422278,0.000093097966,0.00012050133,0.00029819162,0.000021858306,0.000019265573,0.000050279174,0.00004049884,0.0012583408],"category_scores_gemma":[0.000017942313,0.00009572268,0.00007135712,0.0011166814,0.000006248285,0.00008752259,0.0000013789823,0.000075321324,0.00001247298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059762433,0.000043255466,0.038791392,0.000007494457,0.00007879387,0.0000012811062,0.000003845703,0.9594862,0.00066037104,0.00044728076,0.0002831148,0.00019100965],"study_design_scores_gemma":[0.00040343273,0.000005440983,0.23628238,8.580595e-7,0.00004501648,1.5146048e-7,0.0000034978523,0.7556893,0.0059899874,0.000025171857,0.0014503059,0.000104434796],"about_ca_topic_score_codex":0.000036093083,"about_ca_topic_score_gemma":0.00089275185,"teacher_disagreement_score":0.38874647,"about_ca_system_score_codex":0.00023093121,"about_ca_system_score_gemma":0.000019194476,"threshold_uncertainty_score":0.99965465},"labels":[],"label_agreement":null},{"id":"W1613154166","doi":"10.1109/pesgm.2015.7286405","title":"Smart distribution system operations with price-responsive and controllable loads","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controllability; Load management; Scheduling (production processes); Demand response; Computer science; Minification; Load profile; Smart grid; Load regulation; Mathematical optimization; Engineering; Electrical engineering; Voltage; Electricity; Mathematics","score_opus":0.006938234731053367,"score_gpt":0.17083466610014725,"score_spread":0.16389643136909388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1613154166","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34420088,0.00038243257,0.5656555,0.00046469536,0.00064903114,0.0005862957,0.000029826957,0.0012201532,0.08681115],"genre_scores_gemma":[0.9977678,0.0000048331945,0.00074357935,0.000027054066,0.00005174473,0.000054858643,0.00003387377,0.000013187942,0.0013030592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995191,0.000017104121,0.000098272416,0.000102812985,0.00012236496,0.0001403318],"domain_scores_gemma":[0.9996599,0.000017155753,0.0000064523865,0.00014190828,0.00007795863,0.000096601696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013184892,0.00009190902,0.00010462162,0.000031052285,0.00004219445,0.00006937028,0.000046335474,0.000026893065,0.000009825224],"category_scores_gemma":[0.000015740243,0.00007204479,0.000008273514,0.000120852324,0.000012788881,0.00013361523,0.000023451847,0.000036909736,0.000041455547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004071711,0.000010049618,0.000930566,0.000039692746,0.00009605167,0.000012296405,0.000085611005,0.9430353,0.00021755768,0.03371991,0.021733908,0.00007836446],"study_design_scores_gemma":[0.0017890568,0.000120285054,0.0026425258,0.00003543015,0.00005085094,0.000025562615,0.0010145322,0.9130543,0.0014499105,0.000009294312,0.07954864,0.00025962447],"about_ca_topic_score_codex":0.00008130171,"about_ca_topic_score_gemma":0.00012180718,"teacher_disagreement_score":0.65356696,"about_ca_system_score_codex":0.00015147086,"about_ca_system_score_gemma":0.000017820712,"threshold_uncertainty_score":0.29379016},"labels":[],"label_agreement":null},{"id":"W1636262780","doi":"10.2172/1013938","title":"Using Smart Grids to Enhance Use of Energy-Efficiency and Renewable-Energy Technologies","year":2011,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Electricity; Office of Policy and International Affairs; Natural Resources Canada; U.S. Department of Energy","keywords":"Flexibility (engineering); Smart grid; Environmental economics; Sustainability; Electricity; Renewable energy; Service (business); Efficient energy use; Business; Reliability (semiconductor); Computer science; Risk analysis (engineering); Engineering; Marketing; Economics","score_opus":0.05104618795430483,"score_gpt":0.2569360509896626,"score_spread":0.20588986303535778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1636262780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022643562,0.003586518,0.81029207,0.000013063118,0.0032830245,0.00021072997,0.000021513308,0.0017512518,0.17857745],"genre_scores_gemma":[0.7697103,0.044097863,0.10717789,0.0001500693,0.0009564517,0.0005385721,0.00011837587,0.0008182964,0.07643216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99772096,0.000019555448,0.0006455716,0.000504429,0.000533127,0.0005763442],"domain_scores_gemma":[0.99858093,0.00005652572,0.00014205584,0.0009426094,0.00017647774,0.000101390026],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002607268,0.00052538497,0.00068407535,0.00079598266,0.00005000238,0.000045892455,0.00037013539,0.0004618749,0.000042369586],"category_scores_gemma":[0.00014362065,0.0005079001,0.00010402298,0.0005930857,0.000094195755,0.00020743269,0.0005585795,0.00015763761,0.0000019674808],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017415172,0.00014141185,0.001408248,0.0010618956,0.00074904936,0.000048791237,0.000081561295,0.73206276,0.0020719094,0.005711962,0.2194652,0.0371798],"study_design_scores_gemma":[0.00006247364,0.000075766875,0.0001150665,0.00042749784,0.00013008628,0.000030648676,0.00005705463,0.013906592,0.06710063,0.00016104412,0.91700155,0.0009315749],"about_ca_topic_score_codex":0.013455415,"about_ca_topic_score_gemma":0.0014645184,"teacher_disagreement_score":0.767446,"about_ca_system_score_codex":0.00028800554,"about_ca_system_score_gemma":0.000095638294,"threshold_uncertainty_score":0.99973726},"labels":[],"label_agreement":null},{"id":"W1644971860","doi":"10.1109/nafips-wconsc.2015.7284144","title":"Disaggregating household loads via semi-supervised multi-label classification","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Metering mode; Computer science; Electricity; Maximization; Supervised learning; Artificial intelligence; Machine learning; Energy (signal processing); Consumption (sociology); Utility maximization; Energy consumption; Engineering; Statistics; Mathematical optimization; Mathematics; Artificial neural network","score_opus":0.09508141425538677,"score_gpt":0.246721049684853,"score_spread":0.15163963542946624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1644971860","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3092108,0.00023287105,0.6466939,0.00023282647,0.0014549824,0.0002798459,0.000004042786,0.0027885898,0.039102145],"genre_scores_gemma":[0.97327775,0.000017933244,0.02506031,0.00012419689,0.00019096388,0.000048987502,0.000023065351,0.00006728027,0.0011895056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999068,0.000018882487,0.00023015276,0.0001997012,0.00021741776,0.00026581445],"domain_scores_gemma":[0.999397,0.000021114492,0.000023540673,0.0003752589,0.000034139397,0.00014895205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017523614,0.00017084958,0.00012949774,0.000079552614,0.00003685517,0.000049880626,0.00018643393,0.00007011629,0.000032413678],"category_scores_gemma":[0.000028633918,0.0001667418,0.000029982406,0.00022317003,0.000020349533,0.00021699772,0.00005863654,0.00010588383,0.00018105796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013392905,0.000255782,0.013318917,0.00014451455,0.00020281062,0.00001699001,0.0010555178,0.80569655,0.03833445,0.002477051,0.054542176,0.08394186],"study_design_scores_gemma":[0.0007965824,0.000013449432,0.0026722092,0.00001385682,0.000014047875,0.0000016714887,0.00020154146,0.9886789,0.0028705646,0.000031576757,0.004477825,0.000227787],"about_ca_topic_score_codex":0.000053577805,"about_ca_topic_score_gemma":0.000044304426,"teacher_disagreement_score":0.6640669,"about_ca_system_score_codex":0.00016237158,"about_ca_system_score_gemma":0.000008341324,"threshold_uncertainty_score":0.6799533},"labels":[],"label_agreement":null},{"id":"W1644987935","doi":"10.1109/tii.2015.2475215","title":"Optimal Investment for Retail Company in Electricity Market","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"China Postdoctoral Science Foundation; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Electricity market; Electricity; Lagrange multiplier; Investment (military); Economics; Microeconomics; Return on investment; Mathematical optimization; Profit (economics); Mathematics; Engineering","score_opus":0.07001120426015113,"score_gpt":0.238175259953544,"score_spread":0.16816405569339288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1644987935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.117097184,0.000012871725,0.8586676,0.000101467296,0.0031040153,0.0010032553,0.000056599532,0.00039336304,0.019563602],"genre_scores_gemma":[0.98562455,0.000033721368,0.0122678755,0.00037695162,0.00028364453,0.00044874483,0.000021027055,0.00006085696,0.0008826417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872035,0.0000241955,0.00058600726,0.000078821075,0.0002475307,0.00034309662],"domain_scores_gemma":[0.9994287,0.00009038097,0.000052570267,0.00023353787,0.00004413049,0.0001507028],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042518592,0.0001972114,0.00023458138,0.00033143486,0.000049837832,0.00005334824,0.00017436725,0.00018194443,0.000045686756],"category_scores_gemma":[0.000015837162,0.00020938557,0.00007169494,0.000434712,0.000025325644,0.00030734696,0.0000015299314,0.0003776255,0.00003107979],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010694855,0.0000536522,0.0000075835133,0.000022120676,0.00005595877,7.3568344e-7,0.00036938695,0.96279997,0.0000044031713,0.00007267275,0.03291561,0.0035909847],"study_design_scores_gemma":[0.0030509585,0.00025809987,0.000011873953,0.00003460017,0.000040021765,0.0000027287795,0.00045031428,0.9347434,0.0038669633,0.000036188907,0.057226792,0.00027802665],"about_ca_topic_score_codex":0.000026663352,"about_ca_topic_score_gemma":0.000029766403,"teacher_disagreement_score":0.86852735,"about_ca_system_score_codex":0.0004979963,"about_ca_system_score_gemma":0.00006742704,"threshold_uncertainty_score":0.8538496},"labels":[],"label_agreement":null},{"id":"W1674813195","doi":"10.1109/mpe.2015.2416112","title":"Distribution Pricing: Are We Ready for the Smart Grid?","year":2015,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council","keywords":"Incentive; Smart grid; Quarter (Canadian coin); Renewable energy; Electricity; Distribution (mathematics); Grid; Environmental economics; Electric power distribution; Distributed generation; Operations research; Business; Computer science; Transport engineering; Engineering; Economics; Electrical engineering; Microeconomics; Mathematics; Geography; Voltage","score_opus":0.029403232784817865,"score_gpt":0.23184221139568315,"score_spread":0.2024389786108653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1674813195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028872631,0.0086171115,0.8729404,0.0073702484,0.021726936,0.0004411519,0.00028639965,0.001555793,0.05818929],"genre_scores_gemma":[0.9935726,0.00075445144,0.00016879819,0.00021564748,0.0007302467,0.00012340334,0.00012854053,0.00005194376,0.0042543774],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992175,0.000012490181,0.00016900322,0.0001772963,0.00014714066,0.0002765843],"domain_scores_gemma":[0.99945784,0.0000626503,0.000028963377,0.0002775653,0.00006251551,0.00011047641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017812381,0.00017445249,0.00015186273,0.000038036782,0.00007198968,0.000048030364,0.00012747388,0.00005769662,0.000010143576],"category_scores_gemma":[0.00002146253,0.00012945947,0.000041584375,0.0001328459,0.000036189784,0.00009630792,0.000034964003,0.00006621517,0.000018047307],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036536243,0.000027399961,0.000264258,0.000035898545,0.000116694115,0.0000066963603,0.000104075836,0.1756218,0.00027044266,0.0061743255,0.8135239,0.0038179706],"study_design_scores_gemma":[0.0004633109,0.000049764596,0.0020794452,0.000016103435,0.0000396806,0.000006787762,0.00005830747,0.03713149,0.00067035423,0.00022083543,0.9590828,0.00018113207],"about_ca_topic_score_codex":0.000032451433,"about_ca_topic_score_gemma":0.00008854694,"teacher_disagreement_score":0.9647,"about_ca_system_score_codex":0.00006704286,"about_ca_system_score_gemma":0.000007730175,"threshold_uncertainty_score":0.52792037},"labels":[],"label_agreement":null},{"id":"W1683843353","doi":"10.1007/bfb0043278","title":"On-line identification of electric load models for load management","year":2006,"lang":"en","type":"book-chapter","venue":"Lecture notes in control and information sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Identification (biology); Line (geometry); Computer science; Mathematics; Biology; Ecology","score_opus":0.010950761206053232,"score_gpt":0.21381976992385032,"score_spread":0.2028690087177971,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1683843353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008001836,0.00060271524,0.8423657,0.000120576726,0.00027829956,0.00054628274,0.000025425588,0.00005258375,0.15592843],"genre_scores_gemma":[0.99740064,0.00048327842,0.00060837937,0.00033898719,0.0000757922,0.00008269448,0.00003732385,0.000013237449,0.0009596555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864286,0.0000040654627,0.00057458103,0.00014815725,0.0004602695,0.0001700673],"domain_scores_gemma":[0.99938625,0.0001476326,0.00018448177,0.00015027849,0.00011132177,0.00002005341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049960945,0.00019278229,0.00023252549,0.00045213566,0.00005791143,0.0000788807,0.00018081971,0.00011788514,0.0000066129223],"category_scores_gemma":[0.000037096477,0.00016779974,0.000053797055,0.00013308374,0.000055886278,0.0006052477,0.000016736522,0.00009691098,0.00000588577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000146321145,0.0000028866054,8.7122146e-7,0.00013225769,0.00002304808,1.17694064e-7,0.000039246646,0.89142334,0.00001585914,0.06586964,0.00030373607,0.04217433],"study_design_scores_gemma":[0.0006058387,0.00007522661,0.000032064574,0.00006632472,0.000030279885,4.512211e-7,0.0000016534034,0.9250526,0.00023292379,0.06168569,0.01204103,0.00017595736],"about_ca_topic_score_codex":0.000014644547,"about_ca_topic_score_gemma":0.00002202939,"teacher_disagreement_score":0.99732065,"about_ca_system_score_codex":0.00014844658,"about_ca_system_score_gemma":0.000028432914,"threshold_uncertainty_score":0.68426746},"labels":[],"label_agreement":null},{"id":"W1756658042","doi":"10.22215/timreview/925","title":"Using Entrepreneurial Marketing to Foster Reseller Adoption of Smart Micro-Grid Technology","year":2015,"lang":"en","type":"article","venue":"Technology Innovation Management Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Renewable energy; Business; Environmental economics; Electricity; Grid; Industrial organization; Marketing; Economics; Electrical engineering; Engineering","score_opus":0.04371933660691164,"score_gpt":0.2804779758387261,"score_spread":0.23675863923181445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1756658042","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66826373,0.049515463,0.16563526,0.034119807,0.009125828,0.01068187,0.000027778731,0.009342541,0.053287722],"genre_scores_gemma":[0.5520617,0.045080807,0.38803923,0.0079309745,0.0010752268,0.002371413,0.00037901767,0.000632455,0.0024291915],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979778,0.00004945208,0.0009311149,0.00038616668,0.00028427472,0.0003712136],"domain_scores_gemma":[0.9985955,0.000014632678,0.00020508344,0.00083790376,0.0003119624,0.00003495202],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012503517,0.00026829273,0.00043978493,0.0025386335,0.00004117657,0.000014726826,0.00048081198,0.00018377189,0.000060690167],"category_scores_gemma":[0.00020159483,0.0002900994,0.0000453144,0.006514685,0.00007221625,0.00012924227,0.000523092,0.00020792442,0.00013535706],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016071333,0.00026864285,0.013122963,0.015222709,0.0012336638,0.00010013119,0.00007374314,0.04329482,0.031174686,0.09893014,0.44593242,0.35048535],"study_design_scores_gemma":[0.0010629875,0.00012460817,0.0003404131,0.004172999,0.0002706168,0.000025097159,0.00020744147,0.0016752068,0.012520007,0.001812933,0.97710454,0.0006831253],"about_ca_topic_score_codex":0.0000013120751,"about_ca_topic_score_gemma":0.0000020517255,"teacher_disagreement_score":0.53117216,"about_ca_system_score_codex":0.00020728141,"about_ca_system_score_gemma":0.0000121380735,"threshold_uncertainty_score":0.9999551},"labels":[],"label_agreement":null},{"id":"W1820091595","doi":"10.1002/wene.151","title":"Research with disaggregated electricity end‐use data in households: review and recommendations","year":2014,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Electricity; Context (archaeology); Sustainability; Work (physics); Environmental economics; Resource (disambiguation); Computer science; Risk analysis (engineering); Data science; Business; Engineering; Economics; Geography","score_opus":0.053936706726551084,"score_gpt":0.29149484541628645,"score_spread":0.23755813868973535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1820091595","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054221887,0.86464447,0.044529945,0.018674549,0.00060897676,0.0033502544,0.00015377495,0.0006174898,0.013198632],"genre_scores_gemma":[0.16653866,0.8309723,0.0011408337,0.00031667095,0.00007003674,0.00029913575,0.00027579107,0.00005335656,0.00033318496],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980549,0.00035728622,0.00046222808,0.00055315497,0.00019180152,0.0003805941],"domain_scores_gemma":[0.9986306,0.00013804587,0.00005631732,0.0010361585,0.0000059655367,0.00013292207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001359356,0.0002692115,0.00047002212,0.00013024147,0.00014445695,0.000047656544,0.0003381215,0.000060200487,0.00010089997],"category_scores_gemma":[0.000027922695,0.00021323717,0.000025039199,0.0002916009,0.00013988443,0.0003861025,0.0011945853,0.00025645265,0.000015048969],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006576656,0.00045065707,0.005035517,0.003717296,0.0002942047,0.000042493648,0.0004541605,0.016147561,0.00017718085,0.0028335508,0.1589627,0.8118189],"study_design_scores_gemma":[0.00033581755,0.00018170595,0.004652121,0.0031010846,0.00009918679,0.000025658817,0.000031362797,0.013146982,0.0000284858,0.00021770726,0.97778684,0.00039307828],"about_ca_topic_score_codex":0.00004300236,"about_ca_topic_score_gemma":0.0003206577,"teacher_disagreement_score":0.8188241,"about_ca_system_score_codex":0.000121818695,"about_ca_system_score_gemma":0.0000040822247,"threshold_uncertainty_score":0.86955595},"labels":[],"label_agreement":null},{"id":"W1833819033","doi":"10.1007/s12667-016-0193-9","title":"Price and capacity competition in balancing markets with energy storage","year":2016,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Marginal cost; Microeconomics; Energy storage; Economics; Dynamic pricing; Time horizon; Competition (biology); Environmental economics; Peak demand; Electricity market; Electricity; Industrial organization; Power (physics)","score_opus":0.004502223546692922,"score_gpt":0.14664194011370588,"score_spread":0.14213971656701296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1833819033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.644224,0.0012434166,0.30462784,0.00008802976,0.0017911596,0.0001189176,0.0000107618625,0.0006153839,0.04728049],"genre_scores_gemma":[0.998576,0.00015738324,0.000106348474,0.000022591714,0.00019069428,0.000070113085,0.000004099219,0.00003956726,0.00083320454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990458,0.000073024785,0.00020473519,0.00022247633,0.00017995258,0.00027403852],"domain_scores_gemma":[0.9995632,0.00006772882,0.000037545968,0.00023518478,0.000019497546,0.00007683454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017898717,0.0001761151,0.0002045037,0.00015617041,0.000031110714,0.00003338944,0.00008949277,0.00006324521,0.000016687443],"category_scores_gemma":[0.000006561588,0.00012885786,0.000015408139,0.00016764288,0.000029043,0.00017287712,0.000031148502,0.00004166296,0.0000035587004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008232361,0.00007779488,0.015885444,0.0005280672,0.00030726622,0.00024139995,0.00034135216,0.7547478,0.013989404,0.20240147,0.0055363574,0.005861335],"study_design_scores_gemma":[0.0038172225,0.00015889763,0.07839659,0.0022520793,0.0000386577,0.00017371276,0.00028745685,0.32295018,0.004801929,0.00019448914,0.5852415,0.001687276],"about_ca_topic_score_codex":0.0008580139,"about_ca_topic_score_gemma":0.00080946484,"teacher_disagreement_score":0.5797051,"about_ca_system_score_codex":0.0002163426,"about_ca_system_score_gemma":0.000006623975,"threshold_uncertainty_score":0.5254671},"labels":[],"label_agreement":null},{"id":"W1839683","doi":"10.2172/989207","title":"Springboard Engineering's Smart Grid Controller for Non-Smart Household Electricity-Consuming Appliances (Final Technical Report)","year":2010,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Springboard (Canada)","funders":"","keywords":"Smart grid; Backup; Telecommunications; Electricity; Demand response; Grid; Peak demand; Computer science; Engineering; Electrical engineering; Operating system","score_opus":0.025749023725233706,"score_gpt":0.2390963908943621,"score_spread":0.2133473671691284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1839683","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010878799,0.002829176,0.6318262,0.00027052034,0.05138673,0.009141621,0.00030625143,0.014069511,0.27929115],"genre_scores_gemma":[0.63855916,0.007868527,0.18303065,0.0006059103,0.047334604,0.023586841,0.0023415033,0.0055646244,0.09110817],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942363,0.000012371429,0.0017382085,0.001254245,0.001293929,0.0014649798],"domain_scores_gemma":[0.9972228,0.00034816467,0.00040344772,0.0013595034,0.00033140628,0.00033472566],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0016750508,0.0012641479,0.0017632343,0.00077657093,0.0001567092,0.0002193787,0.00084919116,0.001312516,0.00007756355],"category_scores_gemma":[0.0005446637,0.0012824136,0.00077179377,0.0004988228,0.00007900837,0.00018174195,0.0002396736,0.0019891593,0.000045107292],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011455586,0.0002302417,0.0023713491,0.0038768684,0.002557227,0.0010783338,0.000015807103,0.14315791,0.0146692945,0.00067451823,0.81791663,0.013337243],"study_design_scores_gemma":[0.0009689507,0.00006927223,0.0022231953,0.00021982494,0.00039573357,0.00048116894,0.000003223358,0.020929638,0.003500422,0.00001575369,0.9697068,0.0014860486],"about_ca_topic_score_codex":0.00030121848,"about_ca_topic_score_gemma":0.00036734634,"teacher_disagreement_score":0.62768036,"about_ca_system_score_codex":0.0008076724,"about_ca_system_score_gemma":0.0003435201,"threshold_uncertainty_score":0.99998397},"labels":[],"label_agreement":null},{"id":"W1843165013","doi":"10.1109/ichqp.2000.897020","title":"Quantifying PQ and reliability market opportunities from the customer's perspective","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Restructuring; Perspective (graphical); Electricity; Service provider; Electric power industry; Quality (philosophy); Marketing; Business; Customer satisfaction; Service (business); Service quality; Computer science; Power (physics); Telecommunications; Engineering; Finance; Electrical engineering","score_opus":0.05614325472037369,"score_gpt":0.2245371874149449,"score_spread":0.16839393269457123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1843165013","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21351969,0.0015026322,0.0014325505,0.0029924484,0.0006678742,0.00017693095,0.0000143126645,0.0006622158,0.77903134],"genre_scores_gemma":[0.99577534,0.0009153409,0.000568913,0.00020114318,0.00012210704,0.00001587982,0.0000015641803,0.000020134848,0.002379603],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994231,0.000033887114,0.00011256246,0.00015813536,0.000115703006,0.00015663168],"domain_scores_gemma":[0.99944717,0.00017909337,0.00001074622,0.00029404927,0.00002435545,0.00004458374],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00015174413,0.00011595705,0.00009930534,0.00002921169,0.00007715483,0.000053000247,0.000113440714,0.000031545107,0.00233827],"category_scores_gemma":[0.000036759287,0.00008400716,0.000029278282,0.000069817106,0.00006460757,0.00011968912,0.00006759089,0.00009836998,0.00004598861],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015181838,0.00006753709,0.016588736,0.00006389284,0.00038253228,0.00003903927,0.005901803,0.043150544,0.00008554805,0.045415882,0.8775393,0.010749997],"study_design_scores_gemma":[0.00042713044,0.000021391583,0.08613474,0.00003251648,0.00007627227,0.0000042393367,0.021920066,0.51349044,0.00019575792,0.001059135,0.37610704,0.0005312533],"about_ca_topic_score_codex":0.0005438292,"about_ca_topic_score_gemma":0.00012252087,"teacher_disagreement_score":0.78225565,"about_ca_system_score_codex":0.00007098349,"about_ca_system_score_gemma":0.0000015886816,"threshold_uncertainty_score":0.9985737},"labels":[],"label_agreement":null},{"id":"W1868796678","doi":"10.3968/j.est.1923847920130601.2627","title":"Analyses and Discussions of the Blackout in Indian Power Grid","year":2013,"lang":"en","type":"article","venue":"Energy science and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blackout; Grid; Power grid; Electric power system; Power (physics); Computer science; Control (management); China; Computer security; Engineering; Reliability engineering; Geography","score_opus":0.005218019636738169,"score_gpt":0.20770044312028257,"score_spread":0.2024824234835444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1868796678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995616,0.0001477765,0.00007231044,0.0013128985,0.00015699089,0.000032881864,4.6954426e-7,0.00005266601,0.0026079952],"genre_scores_gemma":[0.9996495,0.000069106216,0.00014938248,0.000036482244,0.000006093796,0.0000150315045,1.2747255e-7,0.0000037403431,0.00007053193],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99950975,0.0000050598005,0.0000934674,0.00012680342,0.000100589954,0.00016431036],"domain_scores_gemma":[0.9997173,0.000009485267,0.000014851042,0.0002111433,0.000020958147,0.00002623773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000081225,0.000059716538,0.00007966847,0.00041765004,0.00005579585,0.000014444257,0.00023168745,0.00004586214,0.000014545222],"category_scores_gemma":[0.000041612213,0.000035900102,0.0000073702713,0.0012464451,0.00066241407,0.0001243212,0.00019746846,0.00006173131,0.0000012482008],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017134796,0.00008707064,0.12071259,0.00003104258,0.000066350585,0.000017651882,0.00082413486,0.023454033,0.31709424,0.47590613,0.0041291737,0.057675865],"study_design_scores_gemma":[0.00063026976,0.00012125593,0.568272,0.0001092721,0.000020256752,0.000034623186,0.0037568065,0.024360884,0.34358707,0.026467765,0.03203933,0.0006004788],"about_ca_topic_score_codex":0.00015288166,"about_ca_topic_score_gemma":0.00023555249,"teacher_disagreement_score":0.44943836,"about_ca_system_score_codex":0.000016663005,"about_ca_system_score_gemma":0.000011161833,"threshold_uncertainty_score":0.24406922},"labels":[],"label_agreement":null},{"id":"W1947078470","doi":"10.1109/infocom.2015.7218654","title":"A truthful incentive mechanism for emergency demand response in colocation data centers","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Incentive; Computer science; Remuneration; Demand response; Backup; Server; Environmental economics; Load management; Cost reduction; Electricity; Computer security; Business; Database; Computer network; Microeconomics; Finance; Economics; Engineering","score_opus":0.050171771194554377,"score_gpt":0.2693416255813232,"score_spread":0.2191698543867688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1947078470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42746136,0.000053999658,0.567287,0.00037254614,0.0017353059,0.0005133796,0.00002728837,0.00022642028,0.0023226754],"genre_scores_gemma":[0.9960251,0.000032758457,0.0032511028,0.000041733383,0.000048259088,0.00008629085,0.0000877335,0.000021765496,0.00040524776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932224,0.000035647023,0.00018281842,0.0001812655,0.000103332684,0.00017472237],"domain_scores_gemma":[0.99948764,0.00003121623,0.000016111555,0.00036840898,0.000039488175,0.00005714593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052869937,0.00008937618,0.00008717871,0.00011261268,0.000014080719,0.000010378444,0.000244306,0.000034579578,0.000025807798],"category_scores_gemma":[0.00014023145,0.00009296457,0.000013403945,0.00015727477,0.000005213615,0.00020171188,0.000109294,0.000033797554,0.000020904883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003003677,0.00029434977,0.003773656,0.00023051215,0.0003546182,0.00002341402,0.002824581,0.5909381,0.0061297272,0.08629524,0.3042051,0.0019270753],"study_design_scores_gemma":[0.0013520466,0.0000902553,0.0030330073,0.000014946812,0.000019040399,5.308831e-7,0.0007559445,0.9757895,0.0025296854,0.0021557622,0.014043541,0.00021573465],"about_ca_topic_score_codex":0.000046337886,"about_ca_topic_score_gemma":0.00028094722,"teacher_disagreement_score":0.56856376,"about_ca_system_score_codex":0.0001448342,"about_ca_system_score_gemma":0.00001387887,"threshold_uncertainty_score":0.3790985},"labels":[],"label_agreement":null},{"id":"W1963897199","doi":"10.1109/ias.2013.6682589","title":"Real-time testing of Newton-phaselet method for calculating the power factor of single phase loads","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Newton's method; Power factor; Convergence (economics); Power (physics); Control theory (sociology); AC power; Phase angle (astronomy); Iterative method; Computer science; Mathematics; Algorithm; Nonlinear system; Physics","score_opus":0.026875186945247896,"score_gpt":0.2776890541616262,"score_spread":0.25081386721637833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963897199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5486034,0.000021674898,0.42226356,0.00010927345,0.00021498033,0.0006119666,0.000018251741,0.0002779981,0.027878867],"genre_scores_gemma":[0.791097,8.4835733e-7,0.20808841,0.00002402022,0.00006600979,0.00004907963,0.0000068984796,0.000048263926,0.0006195034],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907374,0.000026516956,0.00038002155,0.00013380693,0.00014553795,0.00024038764],"domain_scores_gemma":[0.99879575,0.0006573391,0.00008570753,0.00030524496,0.00011151959,0.000044426157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021395652,0.00014576409,0.0002309282,0.00006872102,0.000033812532,0.000018272885,0.00016878573,0.000043384724,0.00047436514],"category_scores_gemma":[0.00019826127,0.00010621238,0.00008148389,0.00020983673,0.00001917085,0.00010879265,0.00004937888,0.00004703037,0.000010057718],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040689497,0.000067143905,0.000101703496,0.000079754616,0.00009757001,3.3634436e-7,0.00016873494,0.09006051,0.89770466,0.00053731154,0.00485135,0.006326862],"study_design_scores_gemma":[0.00067014294,0.00014557247,0.0003455869,0.000030209,0.000029499499,0.0000010776332,0.0000974545,0.7335198,0.26345205,0.00009639878,0.0014622391,0.00014997799],"about_ca_topic_score_codex":0.00042291678,"about_ca_topic_score_gemma":0.0000040865752,"teacher_disagreement_score":0.64345926,"about_ca_system_score_codex":0.0000361648,"about_ca_system_score_gemma":0.0000079073625,"threshold_uncertainty_score":0.51939654},"labels":[],"label_agreement":null},{"id":"W1964589816","doi":"10.1109/sege.2013.6707909","title":"Cost optimization via rescheduling in smart grids &amp;#x2014; A linear programming approach","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Linear programming; Demand response; Smart grid; Mathematical optimization; Energy consumption; Task (project management); Power (physics); Consumption (sociology); Power consumption; Energy (signal processing); Function (biology); Grid; Order (exchange); Electricity; Engineering; Algorithm; Electrical engineering; Economics; Mathematics","score_opus":0.022232387837138587,"score_gpt":0.22102310360562763,"score_spread":0.19879071576848906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964589816","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016537774,0.000051737992,0.96602046,0.000064537315,0.00030998085,0.00064881716,2.939073e-7,0.000657395,0.015709024],"genre_scores_gemma":[0.16990559,0.000031685624,0.8284352,0.000068165864,0.00020449291,0.0005636586,0.00008248006,0.00007534209,0.00063343876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885845,0.000024297617,0.00030702894,0.00024280642,0.00017514404,0.00039228133],"domain_scores_gemma":[0.99952316,0.000024248413,0.000022108477,0.0003043957,0.000039617684,0.000086460175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021230082,0.0001900618,0.00016888614,0.00020702592,0.000038537863,0.000082760984,0.00016294252,0.000092755196,0.0002443791],"category_scores_gemma":[0.000027699152,0.00018955348,0.000040032257,0.0004249255,0.000018075594,0.00029777442,0.00007069393,0.00017288643,0.0001998047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016795266,0.00003728905,0.0011389103,0.00005205293,0.000020312309,5.433795e-7,0.00009432722,0.9914688,0.00016018006,0.00011577921,0.0006361003,0.006274056],"study_design_scores_gemma":[0.00027531377,0.000008471269,0.00065027183,0.000018187078,0.0000071157597,0.000002045941,0.00009174689,0.9803186,0.00014373603,0.000012109716,0.01823889,0.00023352276],"about_ca_topic_score_codex":0.00031462766,"about_ca_topic_score_gemma":0.000086312226,"teacher_disagreement_score":0.1533678,"about_ca_system_score_codex":0.00011869678,"about_ca_system_score_gemma":0.000006112492,"threshold_uncertainty_score":0.7729767},"labels":[],"label_agreement":null},{"id":"W1965497469","doi":"10.1016/j.enbuild.2014.10.022","title":"Economic feasibility of residential electricity storage systems in Ontario, Canada considering two policy scenarios","year":2014,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Subsidy; Electricity; Consumption (sociology); Commodity; Environmental economics; Peak demand; Economics; Business; Natural resource economics; Agricultural economics; Electricity market; Finance; Market economy; Engineering; Electrical engineering","score_opus":0.007041512435047582,"score_gpt":0.19334833990139993,"score_spread":0.18630682746635235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965497469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9953041,0.0001491902,0.0016854155,0.000033666307,0.0004976732,0.00005419848,0.0000017541826,0.000046439094,0.0022275515],"genre_scores_gemma":[0.99952346,0.000019714224,0.00009762072,0.000037415863,0.00013624306,0.000008480039,0.0000029272983,0.00001771197,0.000156436],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990804,0.0000365523,0.00029705116,0.00021317217,0.0001033654,0.00026943584],"domain_scores_gemma":[0.999605,0.000059245947,0.000051711762,0.00019999006,0.000011941787,0.00007209418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023051177,0.0001485559,0.00026034002,0.00016574643,0.000039225844,0.000028215913,0.00011258095,0.00004826864,0.000020162652],"category_scores_gemma":[0.000025965397,0.0001686423,0.00002500045,0.00009915868,0.000026574233,0.00009781307,0.00005889164,0.00010638239,2.961778e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000105033105,0.000006359957,0.02672266,0.000036780748,0.000029373898,0.0000054884968,0.00005323105,0.94612324,0.0014106894,0.024332738,0.0010951073,0.00017381636],"study_design_scores_gemma":[0.0039256257,0.00014096542,0.2409382,0.00029211017,0.000070438255,0.000047099064,0.00012244598,0.55689424,0.026934,0.001757197,0.16733702,0.0015406657],"about_ca_topic_score_codex":0.99398124,"about_ca_topic_score_gemma":0.9967068,"teacher_disagreement_score":0.389229,"about_ca_system_score_codex":0.0011379201,"about_ca_system_score_gemma":0.00021561747,"threshold_uncertainty_score":0.6877034},"labels":[],"label_agreement":null},{"id":"W1965889921","doi":"10.1016/j.enbuild.2007.01.020","title":"Load duration curve: A tool for technico-economic analysis of energy solutions","year":2007,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Monte Carlo method; Duration (music); Power (physics); Relevance (law); Peak load; Population; Energy (signal processing); Computer science; Reliability engineering; Econometrics; Simulation; Statistics; Engineering; Mathematics; Automotive engineering","score_opus":0.007229024592210077,"score_gpt":0.20891562749550882,"score_spread":0.20168660290329873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965889921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21178599,0.00055262126,0.7852198,0.000046548877,0.00027793716,0.000038843744,0.00001373098,0.00016224326,0.0019023013],"genre_scores_gemma":[0.9964944,0.00031429564,0.0026523857,0.000043672895,0.00011411284,0.00003461312,0.000039989794,0.000018519317,0.00028799564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992069,0.000005290637,0.00030336683,0.00017260967,0.000080278565,0.00023153298],"domain_scores_gemma":[0.999634,0.000071220355,0.000056899684,0.00016753879,0.000031362735,0.00003895674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003184005,0.00012164075,0.00020103632,0.000352139,0.00007110041,0.000018170706,0.00008815386,0.000079759644,0.000026137155],"category_scores_gemma":[0.000014445065,0.00013252489,0.000110250396,0.0003295703,0.000031990014,0.00012599344,0.000037878533,0.000026124786,3.9445112e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023883718,0.000021829263,0.0005878476,0.000018932345,0.0008625679,9.623866e-7,0.00003905282,0.58721215,0.012344456,0.3817257,0.0034033088,0.013759333],"study_design_scores_gemma":[0.00058631675,0.00006937008,0.0064730225,0.000020379563,0.0007888823,0.0000027303456,0.000042177515,0.37787828,0.06412471,0.0013533379,0.54817617,0.00048465494],"about_ca_topic_score_codex":0.00031264566,"about_ca_topic_score_gemma":0.0010787976,"teacher_disagreement_score":0.78470844,"about_ca_system_score_codex":0.00013465414,"about_ca_system_score_gemma":0.0000104887995,"threshold_uncertainty_score":0.54042083},"labels":[],"label_agreement":null},{"id":"W1968228751","doi":"10.1109/smartgridcomm.2013.6688012","title":"Tackling the photovoltaic integration challenge in the distribution network with deferrable load","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Photovoltaic system; Computer science; Scheduling (production processes); Electricity; Mathematical optimization; Voltage; Load profile; Software deployment; Energy storage; Demand response; Load shifting; Automotive engineering; Electrical engineering; Power (physics); Engineering; Mathematics","score_opus":0.008407539091545142,"score_gpt":0.17823588018608755,"score_spread":0.1698283410945424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968228751","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5735997,0.0008537077,0.28093955,0.0020523933,0.00072225067,0.001512563,0.0000019146341,0.0005944431,0.13972346],"genre_scores_gemma":[0.9989794,0.00009056422,0.00021070338,0.00012477548,0.00014634302,0.0002532032,0.00002100269,0.000012911366,0.00016109564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993609,0.000030864627,0.00012032078,0.000097604156,0.00016623606,0.00022407106],"domain_scores_gemma":[0.99964416,0.00005050237,0.00001378906,0.0002492679,0.000027192962,0.0000150666565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026926148,0.00010631164,0.000067827124,0.000012883925,0.00007298707,0.000079997735,0.00016806256,0.000031305117,0.00009532961],"category_scores_gemma":[0.000008544959,0.000051137242,0.000018769695,0.00024979198,0.000017535227,0.00015124881,0.000019003392,0.00015099898,0.00007667424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003002122,0.0000128879865,0.00035016684,0.000008047406,0.00001766943,0.0000011459161,0.00033407228,0.9676199,0.00006839468,0.0055422606,0.023994697,0.002047748],"study_design_scores_gemma":[0.0002708897,0.000045267905,0.0145492805,0.0000491395,0.000016344606,0.0000028869313,0.0012340083,0.9457424,0.0003766119,0.0011288879,0.03638849,0.00019575741],"about_ca_topic_score_codex":0.00060071325,"about_ca_topic_score_gemma":0.0020183655,"teacher_disagreement_score":0.42537966,"about_ca_system_score_codex":0.000111719855,"about_ca_system_score_gemma":0.00000566779,"threshold_uncertainty_score":0.20853162},"labels":[],"label_agreement":null},{"id":"W1968448601","doi":"10.1109/epc.2007.4520362","title":"DSM Approach for Water Heater Control Strategy Utilizing Elman Neural Network","year":2007,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Artificial neural network; Controller (irrigation); Control (management); Representation (politics); Computer science; Block (permutation group theory); Power (physics); Peak demand; Power demand; Control engineering; Engineering; Artificial intelligence; Electrical engineering; Mathematics; Electricity; Power consumption","score_opus":0.01680571010265009,"score_gpt":0.21199103504469421,"score_spread":0.19518532494204413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968448601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11630555,0.000113456255,0.7843599,0.00006345215,0.00093435583,0.0005103101,0.0000016610798,0.000792597,0.096918724],"genre_scores_gemma":[0.99303836,0.0000025069482,0.0047208457,0.00027083769,0.00083622406,0.000054538865,0.000032781238,0.000056640747,0.000987295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987064,0.000009096633,0.0002455273,0.00019871727,0.000107558255,0.00073271146],"domain_scores_gemma":[0.9996418,0.0000293852,0.000008478067,0.00021801036,0.000018717916,0.00008363681],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035648217,0.00018869892,0.00017556321,0.000056637444,0.000066717286,0.000051241957,0.00013373051,0.00006841367,0.000082706996],"category_scores_gemma":[0.0000014562701,0.0001391689,0.000079242935,0.00006360037,0.000016087808,0.0001089059,0.000026979611,0.00009029043,0.000018247476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021940903,0.000010602106,0.0003699931,0.000038400274,0.000074880765,0.0000048241836,0.000028474884,0.98889875,0.00074704544,0.00178356,0.006621997,0.0013995052],"study_design_scores_gemma":[0.0009640156,0.00004722654,0.001459013,0.0000034983045,0.00003654575,0.0000048920333,0.000095622774,0.96906656,0.005098386,0.00012318064,0.022800889,0.0003001723],"about_ca_topic_score_codex":0.000015555865,"about_ca_topic_score_gemma":0.000022698356,"teacher_disagreement_score":0.87673277,"about_ca_system_score_codex":0.00004237258,"about_ca_system_score_gemma":0.0000014006235,"threshold_uncertainty_score":0.5675143},"labels":[],"label_agreement":null},{"id":"W1968558779","doi":"10.1109/bsc.2010.5473004","title":"Wireless Sensor Networks for domestic energy management in smart grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Energy management; Energy consumption; Home automation; Wireless; Computer science; Scheme (mathematics); Energy management system; Computer network; Telecommunications; Grid; Consumption (sociology); Embedded system; Computer security; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.004906909428514634,"score_gpt":0.19810240363859735,"score_spread":0.19319549421008272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968558779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14266466,0.00006571302,0.76218903,0.00019702122,0.0064766873,0.00053310493,0.0000029518158,0.0010213703,0.08684947],"genre_scores_gemma":[0.9859935,0.00009615739,0.009530228,0.00019088782,0.00036044896,0.00033299284,0.000021235372,0.000068685375,0.0034058492],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989686,0.000008271156,0.00024161287,0.000233451,0.000115986986,0.0004320918],"domain_scores_gemma":[0.99947137,0.000063778265,0.0000146519205,0.00035779594,0.00001529045,0.00007713188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015096022,0.00019488165,0.0001735651,0.00018138596,0.000031651107,0.000037513186,0.0001982224,0.00008891862,0.00009141523],"category_scores_gemma":[0.000004235099,0.00019537433,0.00005762387,0.00023066305,0.000020636735,0.00007131326,0.00006983354,0.00013222032,0.000015472171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010941391,0.000036841913,0.000585895,0.0000690239,0.00009775772,0.00003796262,0.000013099233,0.8933156,0.00028618763,0.07085008,0.011902252,0.022794358],"study_design_scores_gemma":[0.0006927066,0.000015859689,0.0046020634,0.0000122766,0.000022805376,0.000003730098,0.000024401941,0.86110425,0.00034161235,0.00027764417,0.13260312,0.0002995455],"about_ca_topic_score_codex":0.00005870699,"about_ca_topic_score_gemma":0.00083366747,"teacher_disagreement_score":0.84332883,"about_ca_system_score_codex":0.000049989772,"about_ca_system_score_gemma":0.000002669383,"threshold_uncertainty_score":0.7967134},"labels":[],"label_agreement":null},{"id":"W1968785194","doi":"10.1109/vetecf.2010.5594388","title":"TOU-Aware Energy Management and Wireless Sensor Networks for Reducing Peak Load in Smart Grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Environmental economics; Energy management; Computer science; Peak demand; Electricity; Energy consumption; Greenhouse gas; Demand response; Base station; Distributed generation; Load management; Mains electricity; Wireless sensor network; Telecommunications; Renewable energy; Computer network; Energy (signal processing); Electrical engineering; Engineering; Economics","score_opus":0.00492580261137507,"score_gpt":0.18398219767067409,"score_spread":0.17905639505929902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968785194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63744485,0.00023396601,0.2919178,0.00029418635,0.0050945934,0.00070016814,0.000005885652,0.0010108255,0.06329773],"genre_scores_gemma":[0.9910449,0.00020156002,0.004258877,0.00012545798,0.00037954497,0.00017668208,0.00001672561,0.000065782944,0.0037304848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885875,0.000010157491,0.00025235105,0.0003138428,0.00014031614,0.00042457745],"domain_scores_gemma":[0.9994786,0.000046978108,0.000019497991,0.0003407944,0.000025461424,0.00008868931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019671784,0.00021739221,0.00019613399,0.0001390587,0.00005139327,0.000058904956,0.00014657805,0.000100061734,0.000051341598],"category_scores_gemma":[0.000004541964,0.00022287115,0.00004386576,0.00017419882,0.000024826628,0.00010477543,0.00011637823,0.00014971138,0.00000340838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028657054,0.000046449037,0.0011972244,0.0002536691,0.00015528606,0.00004152305,0.00011109632,0.8971793,0.0010110615,0.016896766,0.022229299,0.06084968],"study_design_scores_gemma":[0.000905049,0.000023213766,0.00743283,0.000046904843,0.000027302993,0.000005441711,0.00013645248,0.8914481,0.0008896146,0.00007626103,0.09861665,0.00039217266],"about_ca_topic_score_codex":0.00023689237,"about_ca_topic_score_gemma":0.0017564053,"teacher_disagreement_score":0.35360005,"about_ca_system_score_codex":0.00008248954,"about_ca_system_score_gemma":0.0000049554887,"threshold_uncertainty_score":0.90884215},"labels":[],"label_agreement":null},{"id":"W1968803183","doi":"10.1109/icdret.2009.5454208","title":"A feasibility study of an on-grid solar home system in Bangladesh","year":2009,"lang":"en","type":"article","venue":"2009 1st International Conference on the Developements in Renewable Energy Technology (ICDRET)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Renewable energy; Electricity generation; Photovoltaic system; Fossil fuel; Grid parity; Electric power system; Environmental economics; Grid; Solar power; Economic shortage; Electricity; Distributed generation; Computer science; Engineering; Business; Power (physics); Electrical engineering; Economics; Waste management; Geography; Government (linguistics)","score_opus":0.02874777066832292,"score_gpt":0.25593327062442384,"score_spread":0.2271854999561009,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968803183","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9650885,0.00003806045,0.000756448,0.00045712764,0.0008915745,0.00043447802,0.00001918588,0.0003506647,0.031963974],"genre_scores_gemma":[0.99875665,0.00008015512,0.00041398662,0.00014074246,0.000046734272,0.00016547625,0.00003781782,0.000027693504,0.00033077365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976482,0.00011865026,0.0007346415,0.0005317321,0.0005428494,0.00042396138],"domain_scores_gemma":[0.99882483,0.000050101826,0.00013669865,0.0008069401,0.00013350912,0.000047928334],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00058724673,0.0003469784,0.00039800585,0.0011709528,0.000058492944,0.000044220043,0.001454666,0.00021140192,0.000114002476],"category_scores_gemma":[0.00005888316,0.00030460645,0.000038558002,0.00091456634,0.000067973866,0.00015908251,0.00014751095,0.00034064314,0.000013912812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002652956,0.0024606322,0.025371088,0.000030588235,0.0002931617,0.0001940148,0.00035552817,0.76603854,0.0011990521,0.18686263,0.0012976079,0.01563186],"study_design_scores_gemma":[0.0173216,0.006891768,0.24955882,0.0027729238,0.00010073589,0.00005817396,0.02111289,0.56570154,0.062325932,0.06246382,0.007823551,0.003868262],"about_ca_topic_score_codex":0.00051758444,"about_ca_topic_score_gemma":0.0028589098,"teacher_disagreement_score":0.22418773,"about_ca_system_score_codex":0.0007287251,"about_ca_system_score_gemma":0.000058431557,"threshold_uncertainty_score":0.99994063},"labels":[],"label_agreement":null},{"id":"W1969855100","doi":"10.1109/icdmw.2014.19","title":"Smart Saver: A Consumer-Oriented Web Service for Energy Disaggregation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Upload; Computer science; Service (business); Web service; Energy (signal processing); Energy consumption; Energy conservation; Event (particle physics); Database; World Wide Web; Engineering; Business; Electrical engineering; Marketing","score_opus":0.006022362194187629,"score_gpt":0.1814128778984754,"score_spread":0.17539051570428776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969855100","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056799833,0.0000789876,0.8613344,0.0006558622,0.002181638,0.00025349617,0.000011541092,0.0015134189,0.07717081],"genre_scores_gemma":[0.9931613,0.000032926415,0.0037879415,0.0008045558,0.00021719521,0.00015931783,0.00009462535,0.00005148611,0.0016906488],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999324,0.000013410097,0.000164409,0.00016176832,0.00011198808,0.00022442054],"domain_scores_gemma":[0.9995292,0.000072819705,0.00001936277,0.00026243052,0.00005233356,0.000063893014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009649129,0.00013602286,0.00012028792,0.00007244776,0.0000449822,0.000022591725,0.00010224755,0.00004925034,0.00009623832],"category_scores_gemma":[0.000020937292,0.0001351056,0.00004227724,0.00018155033,0.00000977345,0.000098946744,0.00003277987,0.000030732564,0.000061374216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005884652,0.00010590179,0.0033894572,0.00048333633,0.00047885458,0.0000017900823,0.00020324756,0.29634917,0.0060643507,0.446263,0.1904143,0.056187775],"study_design_scores_gemma":[0.000366631,0.000012249953,0.00030454266,0.000008589301,0.000014542537,4.5592256e-7,0.000010967437,0.4679628,0.0018514269,0.00015028652,0.5292013,0.00011614998],"about_ca_topic_score_codex":0.000106435975,"about_ca_topic_score_gemma":0.000990106,"teacher_disagreement_score":0.9363615,"about_ca_system_score_codex":0.000049926264,"about_ca_system_score_gemma":0.000005272269,"threshold_uncertainty_score":0.5509447},"labels":[],"label_agreement":null},{"id":"W1970129562","doi":"10.1109/tsg.2014.2310395","title":"Residential Energy Management Using a Two-Horizon Algorithm","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Time horizon; Computation; Horizon; Smart grid; Computer science; Limiting; Electricity; Demand response; Energy management; Mathematical optimization; Electricity market; Term (time); Energy (signal processing); Algorithm; Operations research; Engineering; Mathematics","score_opus":0.009044242257478914,"score_gpt":0.20931722878083284,"score_spread":0.20027298652335393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970129562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005422651,0.000028338227,0.97612196,0.000037434656,0.009130703,0.00013874429,0.000015219976,0.00074754347,0.008357374],"genre_scores_gemma":[0.9708814,0.00018680826,0.025419367,0.00019466283,0.0014735885,0.00015538766,0.000014545585,0.00018296274,0.0014912899],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826455,0.000067053006,0.00035903248,0.00040023794,0.00041417498,0.00049497175],"domain_scores_gemma":[0.9991577,0.000039579863,0.000034977526,0.00058986695,0.000030775464,0.00014707976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001877978,0.00033887348,0.00025397996,0.00043697486,0.00021674666,0.00008218225,0.00025876053,0.00008596842,0.00017743903],"category_scores_gemma":[7.5185574e-7,0.0003830968,0.00017074136,0.00041052344,0.000041450123,0.0002018902,0.0000045049196,0.00020617666,0.0001426123],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013484661,0.00006521298,0.000002158021,0.00003248866,0.00022075637,0.000019587218,0.000020648751,0.8932116,0.0006835224,0.00043341165,0.0024295023,0.10286765],"study_design_scores_gemma":[0.0012058022,0.00013691341,0.000080998325,0.00006821887,0.00021656622,0.000018946663,0.000030115656,0.8469344,0.032202918,0.00016752727,0.11832547,0.00061211997],"about_ca_topic_score_codex":0.0002627201,"about_ca_topic_score_gemma":0.00017609859,"teacher_disagreement_score":0.96545875,"about_ca_system_score_codex":0.00022345872,"about_ca_system_score_gemma":0.0000075053435,"threshold_uncertainty_score":0.9998621},"labels":[],"label_agreement":null},{"id":"W1970370622","doi":"10.1109/tsg.2014.2317800","title":"Total Cost of Ownership and Risk Analysis of Collaborative Implementation Models for Integrated Fiber-Wireless Smart Grid Communications Infrastructures","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Computer science; Total cost of ownership; Telecommunications; Exploit; Grid; Renewable energy; Wireless; Computer network; Computer security; Engineering; Electrical engineering","score_opus":0.014668181076184117,"score_gpt":0.2535063982544238,"score_spread":0.23883821717823966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970370622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25788724,0.00003632444,0.73818815,0.000044055032,0.00051924476,0.0005508008,0.0023561425,0.00009651438,0.0003215189],"genre_scores_gemma":[0.9942515,0.00029836682,0.004709385,0.0000139337935,0.000036858368,0.00028791398,0.00033470415,0.00003528205,0.000032046017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986788,0.00013704733,0.00054367253,0.00022927516,0.00019829013,0.00021293387],"domain_scores_gemma":[0.99851483,0.00038741215,0.00017313524,0.00060397084,0.000242642,0.00007803238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028755178,0.0002342001,0.0004524088,0.0006037006,0.00015508184,0.000026927255,0.00021839581,0.00009043942,0.00007126034],"category_scores_gemma":[0.0000078853245,0.00022937194,0.00016290286,0.0011414303,0.00013540809,0.00020524244,0.0000051891975,0.00018233078,0.00000138747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058380596,0.00005464564,0.00046705533,0.000054459582,0.00177778,6.072244e-8,0.0006182486,0.9807906,0.0007824318,0.00029370963,0.00063428184,0.014468304],"study_design_scores_gemma":[0.00106235,0.0001798666,0.00732448,0.00003029466,0.0019424267,6.3027073e-7,0.0009255329,0.9552376,0.03085333,0.00011741297,0.002042029,0.00028401805],"about_ca_topic_score_codex":0.0006904178,"about_ca_topic_score_gemma":0.003932238,"teacher_disagreement_score":0.73636425,"about_ca_system_score_codex":0.00009418031,"about_ca_system_score_gemma":0.00002760484,"threshold_uncertainty_score":0.93535167},"labels":[],"label_agreement":null},{"id":"W1970958942","doi":"10.1049/joe.2014.0345","title":"Smart meter deployment optimisation and its analysis for appliance load monitoring","year":2015,"lang":"en","type":"article","venue":"The Journal of Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software deployment; Computer science; Smart meter; Real-time computing; Reliability (semiconductor); Ambiguity; Dependency (UML); Metre; Distributed computing; Embedded system; Smart grid; Reliability engineering; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.0319121520242632,"score_gpt":0.23114957988292562,"score_spread":0.1992374278586624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970958942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5384399,0.0026498765,0.4577857,0.00006289335,0.00079044607,0.0001082394,8.6404333e-7,0.000060000446,0.00010206311],"genre_scores_gemma":[0.99211115,0.00018909082,0.0073130145,0.000005058017,0.0003125384,0.000010002129,3.315837e-7,0.000024751165,0.000034044766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993445,0.000008169543,0.00023634452,0.000050759943,0.00021056752,0.00014964926],"domain_scores_gemma":[0.9995984,0.000068523426,0.000053415595,0.000104667444,0.00009018715,0.00008481704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006596615,0.00010825661,0.00017185009,0.00013908258,0.000020756992,0.000025264473,0.00012817644,0.000024543793,0.0000014781639],"category_scores_gemma":[0.00004440375,0.00008509615,0.00006322969,0.00019497803,0.000003749739,0.00015118929,0.000024599804,0.000092682465,0.0000011729211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010862421,0.000003091011,0.00038672905,0.000026144766,0.00048319434,0.0000011422316,0.00019317656,0.99525994,0.0031197204,0.000026850825,0.00013740026,0.00035177372],"study_design_scores_gemma":[0.0004866488,0.00005014301,0.0032608286,0.000040340725,0.00062925083,0.000012613587,0.00010413185,0.971934,0.018581526,0.00001612463,0.0047319885,0.00015238929],"about_ca_topic_score_codex":0.0000026529979,"about_ca_topic_score_gemma":0.000001073418,"teacher_disagreement_score":0.45367125,"about_ca_system_score_codex":0.00016254235,"about_ca_system_score_gemma":0.000007613451,"threshold_uncertainty_score":0.347012},"labels":[],"label_agreement":null},{"id":"W1971037610","doi":"10.1109/glocom.2011.6134484","title":"Dynamic Power Management of Distributed Internet Data Centers in Smart Grid Environment","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Smart grid; Electricity market; Electricity; Cloud computing; Computer science; Demand response; Electric power system; The Internet; Linear programming; Environmental economics; Power (physics); Economics; Engineering; Electrical engineering","score_opus":0.016462260101960256,"score_gpt":0.18569220683557347,"score_spread":0.16922994673361322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971037610","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51045895,0.00031694458,0.32545003,0.0001029971,0.0030682113,0.00093472353,0.00037815698,0.00060829415,0.15868168],"genre_scores_gemma":[0.9946046,0.00018508256,0.004401391,0.00001734278,0.0000044758344,0.000017364922,0.00038370295,0.000026573949,0.00035949837],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990335,0.000012475906,0.00030164438,0.000255175,0.0001531198,0.00024410112],"domain_scores_gemma":[0.99907273,0.0000055595237,0.000025571435,0.0008475619,0.0000026769949,0.00004591501],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012985549,0.00015454582,0.00014753066,0.00010031462,0.0000051351058,0.0000064056208,0.00057319447,0.00003104467,0.0009777256],"category_scores_gemma":[0.0000010564057,0.00015467564,0.00002732177,0.00009946089,0.000028379316,0.0001280032,0.0005995575,0.000068122965,0.0000917483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004311111,0.0036966444,0.18653613,0.0023773299,0.0063553276,0.0013180623,0.0029296833,0.5157778,0.0012776204,0.033129875,0.22230805,0.023862349],"study_design_scores_gemma":[0.0016854724,0.0000942751,0.57993287,0.00018948087,0.00009777828,0.0000033526112,0.0007773621,0.32979438,0.0015670746,0.00010642885,0.085025,0.00072653964],"about_ca_topic_score_codex":0.0001308517,"about_ca_topic_score_gemma":0.00008053019,"teacher_disagreement_score":0.4841456,"about_ca_system_score_codex":0.00013786416,"about_ca_system_score_gemma":0.0000010751736,"threshold_uncertainty_score":0.9999355},"labels":[],"label_agreement":null},{"id":"W1971252745","doi":"10.1109/med.2014.6961476","title":"Collective target tracking mean field control for electric space heaters","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Trajectory; SIGNAL (programming language); Field (mathematics); Tracking (education); Computer science; Control theory (sociology); Point (geometry); Mathematical optimization; Control (management); Mathematics; Physics; Geometry","score_opus":0.005482669683272374,"score_gpt":0.18587508769698527,"score_spread":0.1803924180137129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971252745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010049595,0.00003867154,0.9352151,0.0004697225,0.00051895634,0.0003244457,0.0000011059967,0.0004211864,0.052961178],"genre_scores_gemma":[0.99440205,0.0000032321466,0.0029220292,0.00049796735,0.00020298244,0.000097552205,0.0000021922515,0.000033198925,0.0018387729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993488,0.000015604568,0.00011632131,0.00014689221,0.000083176885,0.00028919766],"domain_scores_gemma":[0.9995505,0.00021682387,0.00001232624,0.00014342499,0.000027671718,0.000049208542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015333023,0.00012381376,0.00015408204,0.000102466656,0.000053766827,0.00003287303,0.0000940582,0.00004620409,0.000064156724],"category_scores_gemma":[0.000052460575,0.000119981814,0.00005994994,0.00016334082,0.000003940363,0.00006620101,0.000007760008,0.00006241076,0.000013662394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000644898,0.000025262609,0.0010955881,0.00007475088,0.0003005768,0.0000015677681,0.00035681488,0.8791398,0.007812217,0.0126016475,0.094878756,0.003648534],"study_design_scores_gemma":[0.001132407,0.00017121063,0.0007419465,0.000007204571,0.000030137786,8.7063347e-7,0.000031155745,0.8864285,0.07105387,0.0009547704,0.039204568,0.00024338134],"about_ca_topic_score_codex":0.000023494196,"about_ca_topic_score_gemma":0.000036496684,"teacher_disagreement_score":0.98435247,"about_ca_system_score_codex":0.00013948146,"about_ca_system_score_gemma":0.000009699848,"threshold_uncertainty_score":0.48927164},"labels":[],"label_agreement":null},{"id":"W1972254270","doi":"10.1109/ispa.2012.137","title":"Using Low-power Embedded Microcontrollers as Web Servers","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Server; Operating system; Server farm; Microcontroller; Computer science; Web server; Power consumption; Embedded system; File server; Application server; Power (physics); Controller (irrigation); Computer network; Client–server model; The Internet","score_opus":0.011725923573809032,"score_gpt":0.22076014828467194,"score_spread":0.20903422471086291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972254270","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.811778,0.00016962008,0.0038267523,0.00003456173,0.0016546806,0.00013790131,9.473196e-7,0.00053753325,0.18186001],"genre_scores_gemma":[0.9953059,0.000010415587,0.0027573186,0.0002664693,0.00018390526,0.000009578469,0.0000020972743,0.000046704277,0.0014176089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991723,0.000011790922,0.00014972292,0.00010481112,0.00012700693,0.00043437784],"domain_scores_gemma":[0.9996,0.000015512533,0.000013850603,0.00023233822,0.000013381266,0.00012494712],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011494726,0.0001573745,0.00013864445,0.000095293384,0.000036849757,0.000027605147,0.00011650702,0.000056146182,0.0013620023],"category_scores_gemma":[0.000006533297,0.0001539406,0.000070673,0.00013649142,0.000013202672,0.00025486512,0.000046698737,0.00007281242,0.0005968778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001634079,0.000056165678,0.0030332892,0.000057591387,0.00036081497,0.000009627695,0.00041965587,0.8928644,0.06127207,0.002759815,0.038874593,0.00027563283],"study_design_scores_gemma":[0.004045143,0.000034116292,0.0042951885,0.000070357244,0.00016400412,0.000028035396,0.0016460769,0.5727965,0.05530187,0.00007032579,0.35992587,0.0016225034],"about_ca_topic_score_codex":0.000025908173,"about_ca_topic_score_gemma":0.000009684271,"teacher_disagreement_score":0.32105127,"about_ca_system_score_codex":0.00012426992,"about_ca_system_score_gemma":0.000008023362,"threshold_uncertainty_score":0.9995509},"labels":[],"label_agreement":null},{"id":"W1972694349","doi":"10.1109/icc.2013.6655203","title":"Service-oriented architecture for smart building energy management","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Integer programming; Energy consumption; Linear programming; Smart grid; Service (business); Energy management; Service-oriented architecture; Architecture; Renewable energy; Heuristic; Electricity; Greenhouse gas; Distributed computing; Energy (signal processing); Web service; Engineering; World Wide Web; Business; Algorithm","score_opus":0.0047469414412085655,"score_gpt":0.1778752014106752,"score_spread":0.17312825996946662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972694349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020418398,0.00006383275,0.9192478,0.0007321388,0.0010411206,0.00043451585,0.0000026662244,0.0010718291,0.056987684],"genre_scores_gemma":[0.7549594,0.00008767621,0.2268911,0.003891816,0.00066626794,0.0027006336,0.000093755225,0.00024874104,0.010460621],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99902487,0.000007387487,0.00019334129,0.0002292614,0.00014648108,0.00039867478],"domain_scores_gemma":[0.99948287,0.000026883868,0.000015290274,0.0003422588,0.000041880856,0.000090818736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000054205633,0.00020363714,0.00013796713,0.00016094116,0.000055863286,0.000050477738,0.00020998361,0.00004900781,0.00032480605],"category_scores_gemma":[0.0000023273376,0.00018991606,0.00006427269,0.00026053586,0.000007725488,0.00010371299,0.00010428057,0.00005157963,0.000076687174],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006838578,0.000033335593,0.00010076031,0.00034749348,0.0004075586,0.000004234456,0.00007107662,0.6803303,0.0018835842,0.12233673,0.13719028,0.057287846],"study_design_scores_gemma":[0.0005064665,0.000019066685,0.0009230624,0.00002423072,0.000031886877,0.0000017441037,0.000085791326,0.21541797,0.0038169185,0.002408567,0.7764382,0.00032611395],"about_ca_topic_score_codex":0.00021867994,"about_ca_topic_score_gemma":0.00017429522,"teacher_disagreement_score":0.734541,"about_ca_system_score_codex":0.000064936045,"about_ca_system_score_gemma":0.0000017368742,"threshold_uncertainty_score":0.7744552},"labels":[],"label_agreement":null},{"id":"W1975012710","doi":"10.1109/tsg.2014.2384202","title":"Optimizing Electric Vehicle Coordination Over a Heterogeneous Mesh Network in a Scaled-Down Smart Grid Testbed","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Testbed; Smart grid; Demand response; Network packet; Computer science; Grid; Electric vehicle; Computer network; Engineering; Electricity; Electrical engineering; Power (physics)","score_opus":0.013769264025843192,"score_gpt":0.21226034580752146,"score_spread":0.19849108178167826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975012710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70529586,0.00049792643,0.27574605,0.0003059904,0.011990324,0.0010055638,0.000033654687,0.0016266316,0.0034980022],"genre_scores_gemma":[0.99717516,0.00009793933,0.001103847,0.00021082656,0.0006881715,0.00030761538,0.000018319008,0.00012262115,0.00027552465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975536,0.00010964488,0.0005573841,0.00049074873,0.00048264372,0.0008060008],"domain_scores_gemma":[0.9989458,0.00012129419,0.00006125772,0.00052707613,0.00007746487,0.00026712852],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004414385,0.0004295718,0.00040849086,0.00053721346,0.00014825258,0.00009892106,0.00028098634,0.00018688996,0.00008888421],"category_scores_gemma":[0.000011171754,0.0004887757,0.0001722201,0.0014259029,0.000035088375,0.00035295158,0.0000055672103,0.0005062903,0.0001779695],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007799287,0.00014790069,0.00044682302,0.000025369693,0.000110005276,0.000042910433,0.00013691184,0.98513365,0.0011244417,0.000014265548,0.009574149,0.0031655838],"study_design_scores_gemma":[0.0023617628,0.0002633952,0.0016295926,0.00009687183,0.0001024885,0.000036538666,0.00003444537,0.96389073,0.0132623175,0.00005650076,0.01751015,0.00075520494],"about_ca_topic_score_codex":0.00025246714,"about_ca_topic_score_gemma":0.00089437334,"teacher_disagreement_score":0.29187927,"about_ca_system_score_codex":0.00069203257,"about_ca_system_score_gemma":0.000050065802,"threshold_uncertainty_score":0.9997564},"labels":[],"label_agreement":null},{"id":"W1977963540","doi":"10.1016/j.procs.2013.06.095","title":"Compressed Air Storage and Wind Energy for Time-of-day Electricity Markets","year":2013,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Compressed air energy storage; Electricity; Energy storage; Renewable energy; Pumped-storage hydroelectricity; Wind power; Tariff; Computer science; Environmental economics; Automotive engineering; Environmental science; Distributed generation; Power (physics); Electrical engineering; Business; Economics; Engineering","score_opus":0.004359207612814838,"score_gpt":0.17211801758820303,"score_spread":0.1677588099753882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977963540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26468655,0.0001359775,0.7334737,0.00006831194,0.0005013612,0.00024857576,0.0000016933105,0.00019298105,0.00069082377],"genre_scores_gemma":[0.98030734,0.0000139318745,0.019297117,0.00011425147,0.00014651644,0.000038712707,0.0000015224753,0.000014700457,0.00006588308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902976,0.000009401166,0.00015577818,0.00027287746,0.00021396516,0.00031820027],"domain_scores_gemma":[0.99945945,0.00010236655,0.000033743814,0.00019357174,0.00011003677,0.00010082887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002587255,0.00012856994,0.00014907216,0.00016561039,0.000075224176,0.00006132169,0.00038050022,0.000027906102,0.000011239468],"category_scores_gemma":[0.000020743342,0.0001240169,0.000022642547,0.0004207287,0.00012403654,0.00036772783,0.00014932791,0.000043021748,0.0000067564342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018553903,0.00015015242,0.0024899303,0.0006319919,0.00010565048,0.0000042613756,0.00096730265,0.7011121,0.052537836,0.0036373427,0.057970885,0.18037401],"study_design_scores_gemma":[0.0001734459,0.000039217874,0.024113255,0.000013252731,0.00000447642,0.0000018845927,0.0000011806615,0.9605568,0.012152018,0.00023747103,0.002561825,0.00014519403],"about_ca_topic_score_codex":0.000011408676,"about_ca_topic_score_gemma":8.91199e-7,"teacher_disagreement_score":0.7156208,"about_ca_system_score_codex":0.00003738021,"about_ca_system_score_gemma":0.000026214042,"threshold_uncertainty_score":0.5057262},"labels":[],"label_agreement":null},{"id":"W1980350681","doi":"10.2202/1553-779x.1279","title":"Harmonic Reducing ANN Controller for a SVC Compensating Unbalanced Fluctuating Loads","year":2006,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Control theory (sociology); Controller (irrigation); Fuzzy logic; Harmonics; Static VAR compensator; Computer science; Total harmonic distortion; AC power; Electric power system; Harmonic; Artificial neural network; Computation; Control engineering; Power (physics); Voltage; Engineering; Algorithm; Artificial intelligence; Control (management)","score_opus":0.006691977607030426,"score_gpt":0.22806236685347936,"score_spread":0.22137038924644895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980350681","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4172839,0.0055454676,0.5566254,0.00036473802,0.014645664,0.00043361122,0.000009346661,0.00023434435,0.004857523],"genre_scores_gemma":[0.99718416,0.000031030162,0.0010719511,0.000041942723,0.0013796218,0.000024280118,0.0000063905613,0.00005380363,0.00020683909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780655,0.000041848507,0.0010108902,0.0001630013,0.00060345914,0.00037427942],"domain_scores_gemma":[0.99862736,0.00020154858,0.00046720516,0.00011273981,0.0005331291,0.00005801129],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070924615,0.00021104384,0.00037489508,0.0005262752,0.00007302666,0.00016035681,0.00044400126,0.000057736765,0.000012018962],"category_scores_gemma":[0.00012490239,0.0002067515,0.00019066059,0.00025634916,0.000010046818,0.0002515669,0.000027036058,0.00021650727,0.000005224873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005426436,0.000030636947,0.00036154588,0.000036359128,0.00057380885,0.000031623378,0.0001353681,0.9301716,0.05132849,0.0012021944,0.014421986,0.0016521321],"study_design_scores_gemma":[0.0023506847,0.00010717636,0.0009377714,0.0003602129,0.000058486814,0.00020182227,0.000119334305,0.969918,0.003816826,0.00018371826,0.02162733,0.00031864105],"about_ca_topic_score_codex":0.00008628427,"about_ca_topic_score_gemma":0.000002569253,"teacher_disagreement_score":0.57990026,"about_ca_system_score_codex":0.00047491727,"about_ca_system_score_gemma":0.000040743922,"threshold_uncertainty_score":0.8431082},"labels":[],"label_agreement":null},{"id":"W1981174551","doi":"10.1109/isgteurope.2013.6695436","title":"Incentive based smart pricing scheme using scoring rule","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Incentive; Payment; Dynamic pricing; Electricity; Scheduling (production processes); Schedule; Scheme (mathematics); Incentive compatibility; Operations research; Mathematical optimization; Microeconomics; Economics; Engineering","score_opus":0.012442106856690666,"score_gpt":0.19230229276833719,"score_spread":0.17986018591164651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981174551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7892457,0.000037588787,0.17109507,0.000034599863,0.00062135304,0.00018194824,3.0183764e-7,0.0006377232,0.038145702],"genre_scores_gemma":[0.93642735,0.0000030249746,0.06296957,0.00012033844,0.00011556854,0.000027761149,0.000002820307,0.000043294698,0.00029026234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918586,0.000009785851,0.00016907202,0.00016424782,0.00015147829,0.0003195683],"domain_scores_gemma":[0.9996234,0.000023261364,0.000017095404,0.00023280756,0.00003356759,0.000069832146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000776608,0.00014769522,0.0001202759,0.0001250543,0.000059876485,0.00007016998,0.00012235517,0.000037176585,0.00063062913],"category_scores_gemma":[0.000011240825,0.00014924731,0.000040493305,0.0002213249,0.00001465824,0.00029367325,0.00006996026,0.000090538226,0.00029291533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014852908,0.000024384395,0.021559512,0.000101097074,0.00008582367,0.000006015876,0.000059066097,0.9028303,0.070638515,0.00084282184,0.002065509,0.0017854621],"study_design_scores_gemma":[0.0001967956,0.000004593807,0.009996001,0.00004384775,0.000008242602,4.236538e-7,0.00005810692,0.9662419,0.021638125,0.000039285005,0.0015712193,0.00020148684],"about_ca_topic_score_codex":0.00031489434,"about_ca_topic_score_gemma":0.000008967864,"teacher_disagreement_score":0.14718165,"about_ca_system_score_codex":0.00017554786,"about_ca_system_score_gemma":0.000008509746,"threshold_uncertainty_score":0.69049466},"labels":[],"label_agreement":null},{"id":"W1981657074","doi":"10.1109/isgt.2010.5434752","title":"Optimal and autonomous incentive-based energy consumption scheduling algorithm for smart grid","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":509,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Software deployment; Energy consumption; Scheduling (production processes); Grid; Demand response; Schedule; Distributed computing; Distributed generation; Distributed algorithm; Incentive; Energy management system; Electricity; Energy management; Real-time computing; Energy (signal processing); Mathematical optimization; Engineering; Renewable energy; Electrical engineering; Operating system","score_opus":0.008631413739550758,"score_gpt":0.2078240666044262,"score_spread":0.19919265286487545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981657074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14439644,0.000060551683,0.85225266,0.000048271388,0.001611188,0.000117185926,0.000010043762,0.00045375034,0.0010498883],"genre_scores_gemma":[0.52395546,0.00003271284,0.47495115,0.00013348059,0.0004239245,0.00013815393,0.000066434746,0.000052735264,0.00024596188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999319,0.0000062007366,0.00015433755,0.00019675503,0.00008065083,0.00024305988],"domain_scores_gemma":[0.99965405,0.000054825417,0.000018581479,0.0001624977,0.000029969868,0.00008006822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011300451,0.00014894424,0.0001235809,0.00009884853,0.00006940051,0.000055520926,0.00008140752,0.000077336896,0.000114452894],"category_scores_gemma":[0.000008249979,0.00015577067,0.000039590457,0.00005180054,0.000041224914,0.00011014881,0.000034005127,0.00009530031,0.000010031374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017113187,0.000068876776,0.0015667906,0.00012416074,0.00016670178,0.000007651967,0.000038301474,0.76354533,0.011336593,0.011279364,0.0021819675,0.20966713],"study_design_scores_gemma":[0.00058743614,0.000022083514,0.0011684945,0.00000657897,0.000018675983,0.0000016267392,0.000007925565,0.93970233,0.017002745,0.00002238506,0.041267294,0.00019240975],"about_ca_topic_score_codex":0.000037387297,"about_ca_topic_score_gemma":0.00006661483,"teacher_disagreement_score":0.379559,"about_ca_system_score_codex":0.000035605008,"about_ca_system_score_gemma":0.000011391311,"threshold_uncertainty_score":0.6352144},"labels":[],"label_agreement":null},{"id":"W1982969324","doi":"10.4236/ti.2013.43021","title":"Impacts of Smart Grid Concept on Energy Industry","year":2013,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"České Vysoké Učení Technické v Praze","keywords":"Smart grid; Environmental economics; Grid; Electricity; Renewable energy; Computer science; Boom; Sustainability; Work (physics); Electricity generation; Business; Industrial organization; Environmental science; Power (physics); Economics; Electrical engineering; Engineering; Mechanical engineering","score_opus":0.006502244830591835,"score_gpt":0.18558073158987298,"score_spread":0.17907848675928115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982969324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9849271,0.0006129342,0.000086409054,0.0006501497,0.000314147,0.000096921714,0.0000024061928,0.00037634984,0.012933578],"genre_scores_gemma":[0.998698,0.00006494251,0.0002123585,0.00075161457,0.000036593592,0.00006650609,0.0000035377004,0.000014148952,0.00015228784],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99947375,0.0000068984114,0.00014567324,0.00011952065,0.000065844164,0.00018830576],"domain_scores_gemma":[0.9996562,0.000011315077,0.000025056403,0.00024143771,0.000013032643,0.00005293703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000028560824,0.00012105809,0.00013957202,0.00025799597,0.000022574432,0.0000055785727,0.000104650586,0.00026694656,0.00011268312],"category_scores_gemma":[0.00000956111,0.000109721375,0.000015896798,0.0001996842,0.00015163177,0.000055375716,0.00006228932,0.00018038083,0.000022148355],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043030227,0.00007036716,0.0047936933,0.000036262598,0.00018146113,0.0000072398684,0.000071328475,0.0049267206,0.0046052905,0.9055493,0.07159304,0.008161003],"study_design_scores_gemma":[0.001533559,0.0012168253,0.029109325,0.00017269833,0.00005647918,0.00002190001,0.00043180014,0.007422548,0.679875,0.06042831,0.2190043,0.0007272044],"about_ca_topic_score_codex":0.000059752754,"about_ca_topic_score_gemma":0.000006979286,"teacher_disagreement_score":0.84512097,"about_ca_system_score_codex":0.000036840924,"about_ca_system_score_gemma":0.000005149727,"threshold_uncertainty_score":0.4474308},"labels":[],"label_agreement":null},{"id":"W1983567088","doi":"10.1109/ghtc.2011.9","title":"Simulation of Rural Electrification via Cellular-Enabled Micro-inverter","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electrification; Rural electrification; Electricity; Grid; Mobile phone; Inverter; Power grid; Environmental economics; Business; Telecommunications; Computer science; Power (physics); Electrical engineering; Engineering; Economics; Voltage; Geography","score_opus":0.012060572657662404,"score_gpt":0.17773161823895303,"score_spread":0.16567104558129062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983567088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38756743,0.000035788707,0.58891875,0.0000051629904,0.00021790552,0.000109113964,3.0368162e-7,0.00022677935,0.022918787],"genre_scores_gemma":[0.997989,0.000005406193,0.0014613965,0.00001860053,0.00003603194,0.0000076068573,0.000011798085,0.000018011991,0.0004521358],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995668,0.000009047476,0.00016626275,0.00005876372,0.00007404644,0.00012510398],"domain_scores_gemma":[0.9997236,0.000012820013,0.000021455666,0.00018963753,0.000029678557,0.000022787308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058906775,0.00007812689,0.00007955305,0.000079861806,0.000012220881,0.0000046826503,0.00008074245,0.00003875233,0.00035937005],"category_scores_gemma":[0.0000034885913,0.00007672397,0.000031049643,0.00012421266,0.000007901749,0.00010069597,0.000006887452,0.000034812518,0.00008358205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075337957,0.000022015103,0.0006709148,0.000030154142,0.000041522213,3.9575374e-7,0.00020638635,0.49947485,0.4969111,0.0005795275,0.00047284053,0.0015827385],"study_design_scores_gemma":[0.00010143172,0.0000096905505,0.0019211033,0.0000025736394,0.000009595373,8.078545e-8,0.000017483499,0.5432553,0.45419267,0.000103275444,0.00032271823,0.00006407048],"about_ca_topic_score_codex":0.000049728496,"about_ca_topic_score_gemma":0.0000055651485,"teacher_disagreement_score":0.6104216,"about_ca_system_score_codex":0.000032083695,"about_ca_system_score_gemma":0.0000020985424,"threshold_uncertainty_score":0.393485},"labels":[],"label_agreement":null},{"id":"W1984560471","doi":"10.1109/tsg.2010.2055903","title":"Optimal Residential Load Control With Price Prediction in Real-Time Electricity Pricing Environments","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1829,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Payment; Electricity; Operations research; Mathematics; Engineering; World Wide Web; Electrical engineering","score_opus":0.00370563764348467,"score_gpt":0.17633241643836858,"score_spread":0.17262677879488392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984560471","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6084229,0.000005048187,0.38668075,0.000036652025,0.001512561,0.00038121673,0.000024434947,0.0003591902,0.0025772753],"genre_scores_gemma":[0.9974594,0.000056689383,0.0012536577,0.000026747319,0.00026467108,0.00015889875,0.0000068851396,0.00006850971,0.00070452446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831367,0.000043093383,0.00034243942,0.00036720673,0.00047292298,0.0004606613],"domain_scores_gemma":[0.9993521,0.000069814625,0.0000455844,0.00039714112,0.000019815574,0.00011555933],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002687155,0.00027885393,0.0002436316,0.00030173972,0.00012611823,0.00004456622,0.00017205327,0.00014168878,0.0002510846],"category_scores_gemma":[0.0000037599482,0.00028575707,0.000069154485,0.00039603224,0.00004704439,0.0003085505,0.0000015114729,0.00061876944,0.00020541275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016719989,0.00013610952,0.0003374933,0.000014431602,0.000103922124,0.00001875857,0.0000774484,0.9094963,0.08851156,0.000004267995,0.00056486373,0.00056764955],"study_design_scores_gemma":[0.0063617234,0.0006357594,0.06767316,0.00009208065,0.00028318423,0.00005921847,0.00003579141,0.7127162,0.20157272,0.0000076876195,0.0095482115,0.0010142315],"about_ca_topic_score_codex":0.00026188136,"about_ca_topic_score_gemma":0.00042342563,"teacher_disagreement_score":0.38903654,"about_ca_system_score_codex":0.00036869245,"about_ca_system_score_gemma":0.000030650077,"threshold_uncertainty_score":0.99995947},"labels":[],"label_agreement":null},{"id":"W1984757241","doi":"10.1109/smartgridcomm.2013.6688037","title":"Optimal energy management for cooperative microgrids with renewable energy resources","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Renewable energy; Computer science; Energy management; Demand response; Exploit; Microgrid; Mathematical optimization; Scheduling (production processes); Grid; Energy (signal processing); Distributed computing; Electricity; Engineering; Electrical engineering","score_opus":0.004316754681416663,"score_gpt":0.16540762844896548,"score_spread":0.16109087376754883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984757241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014947762,0.00035566546,0.76675063,0.00021042963,0.00035669247,0.00036473203,0.000005613678,0.0008940753,0.21611442],"genre_scores_gemma":[0.70706713,0.00042314583,0.13050438,0.0011456779,0.000571205,0.0033961504,0.000110975336,0.0002575835,0.15652376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99882114,0.000014104573,0.00021637525,0.00031403964,0.00016845773,0.00046589586],"domain_scores_gemma":[0.999417,0.000033056665,0.000022910475,0.0003490508,0.000071623785,0.00010637272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005627584,0.00027581796,0.00020652723,0.00014697821,0.00009616105,0.00013775621,0.00024519744,0.00005598931,0.00043674678],"category_scores_gemma":[0.0000014841121,0.00022237696,0.000053052092,0.00022771588,0.000041959975,0.00020462612,0.00008935364,0.000035731922,0.000026146881],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014970085,0.000026143547,0.000015470998,0.000031105126,0.00028575028,0.0000048533143,0.000044727283,0.8329029,0.00041563102,0.0065941066,0.1569801,0.002684243],"study_design_scores_gemma":[0.0007375954,0.00016031138,0.00011137805,0.000024166582,0.000043372867,0.0000034223867,0.0003283971,0.19812956,0.021008665,0.000076327335,0.7789674,0.00040940088],"about_ca_topic_score_codex":0.0015713237,"about_ca_topic_score_gemma":0.00061269716,"teacher_disagreement_score":0.69211936,"about_ca_system_score_codex":0.00008148731,"about_ca_system_score_gemma":0.0000047700964,"threshold_uncertainty_score":0.9068269},"labels":[],"label_agreement":null},{"id":"W1987253469","doi":"10.1109/ccece.2014.6900956","title":"A fuzzy logic system for demand-side load management in residential buildings","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; Demand response; Load management; Fuzzy logic; Computer science; Electricity; Load balancing (electrical power); Energy management; Wireless; Demand side; Load shifting; Energy (signal processing); Engineering; Electrical engineering; Telecommunications; Environmental economics; Grid","score_opus":0.008241475544440012,"score_gpt":0.20539730023243843,"score_spread":0.19715582468799842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987253469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037751645,0.00012605048,0.48753884,0.00017690567,0.0015044376,0.0007646872,0.0000012696863,0.001075981,0.47106016],"genre_scores_gemma":[0.9853465,0.00002301532,0.012565231,0.00009624447,0.00021525893,0.0002702601,0.0000040962336,0.000043636912,0.0014357505],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883395,0.000019458696,0.000302131,0.00025988818,0.00021110097,0.0003734454],"domain_scores_gemma":[0.9995577,0.0000389958,0.000023828103,0.0003034207,0.000020902951,0.000055186567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004966916,0.00017658145,0.00019975234,0.0001902906,0.00003654272,0.000053897027,0.00022687059,0.00005744406,0.000013272118],"category_scores_gemma":[0.000013572021,0.0001732562,0.00006672963,0.00017428938,0.000010732698,0.00009420727,0.00009620356,0.000057587975,0.00008446535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019874724,0.000015870914,0.00011966078,0.0006430622,0.00010350697,0.00001809943,0.00003587897,0.48438603,0.000323799,0.49688107,0.015573972,0.0018791675],"study_design_scores_gemma":[0.0075509152,0.00020143068,0.01026005,0.00056614407,0.00028468992,0.000020460187,0.0012348806,0.5656823,0.012253155,0.01674216,0.38334042,0.0018633954],"about_ca_topic_score_codex":0.00010205137,"about_ca_topic_score_gemma":0.00021783635,"teacher_disagreement_score":0.9475949,"about_ca_system_score_codex":0.00046207794,"about_ca_system_score_gemma":0.000003143421,"threshold_uncertainty_score":0.70651823},"labels":[],"label_agreement":null},{"id":"W1989657130","doi":"10.1109/epec.2011.6070188","title":"Application of PSO to optimize the operation of electric water heaters for reserve provision","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Environmental science; Computer science","score_opus":0.014932588211993074,"score_gpt":0.19994027698010772,"score_spread":0.18500768876811463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989657130","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17117338,0.000012480018,0.82421154,0.00016076119,0.000083219966,0.0008500781,8.8464793e-7,0.000061878156,0.00344576],"genre_scores_gemma":[0.9884317,0.0000056458407,0.011148558,0.000027406095,0.000019008326,0.0002152971,0.000007687123,0.0000124275275,0.00013227238],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995999,0.0000071957097,0.00015340341,0.000077249126,0.00006790955,0.000094339164],"domain_scores_gemma":[0.99972105,0.000009915483,0.000010264597,0.00020551217,0.000039075898,0.000014181446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015903561,0.000051800303,0.00006763621,0.000060377835,0.000015484235,0.000004096152,0.00011359113,0.000019884306,0.000020938358],"category_scores_gemma":[0.000004432563,0.000030032159,0.000023471443,0.00008076316,0.000004424496,0.000053237254,0.000024050432,0.000016403601,0.0000066118037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046923713,0.000021530765,0.00011209856,0.00006447826,0.000029305695,2.3469061e-8,0.00049663463,0.81515294,0.17693038,0.00217927,0.0019359451,0.0030304696],"study_design_scores_gemma":[0.00010648841,0.00006336126,0.0004729882,0.0000025241868,0.000007367013,5.340046e-8,0.000020186693,0.32386032,0.67437917,0.000053351938,0.0009979599,0.000036231726],"about_ca_topic_score_codex":0.00015040785,"about_ca_topic_score_gemma":0.000016103313,"teacher_disagreement_score":0.8172583,"about_ca_system_score_codex":0.000019407176,"about_ca_system_score_gemma":0.0000017816394,"threshold_uncertainty_score":0.12246759},"labels":[],"label_agreement":null},{"id":"W1990499846","doi":"10.1109/tsg.2015.2418790","title":"Indirect Load Shaping for CHP Systems Through Real-Time Price Signals","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Lyapunov optimization; Computer science; Queueing theory; Queue; Smart grid; Mathematical optimization; Optimization problem; Electric power system; Distributed computing; Power (physics); Engineering; Lyapunov equation; Computer network","score_opus":0.04776442756873813,"score_gpt":0.24875410865703665,"score_spread":0.2009896810882985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990499846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016773056,0.00026767683,0.93735707,0.000121373814,0.010158458,0.0010402913,0.00011912817,0.0017732439,0.0323897],"genre_scores_gemma":[0.9865508,0.00036009468,0.0048763067,0.00018199575,0.0016238535,0.0014356294,0.000035497935,0.00028565474,0.004650179],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817693,0.00005184211,0.00042529753,0.00037224073,0.0004548175,0.00051885523],"domain_scores_gemma":[0.998993,0.0001631277,0.000057010246,0.00046697864,0.00013706385,0.00018284192],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004650517,0.00033481055,0.00039136902,0.00017419504,0.00014942656,0.00009588515,0.0002519248,0.00014264506,0.00006580751],"category_scores_gemma":[0.000009770917,0.0003544827,0.00016457499,0.00039357351,0.000032800286,0.00035598845,0.000002184891,0.00019468392,0.00044752657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043919703,0.000068736066,0.0000043945843,0.00012376037,0.00025259992,0.0000061029637,0.0004279904,0.9640255,0.0029003103,0.00003995645,0.031523187,0.00058352953],"study_design_scores_gemma":[0.0031622734,0.0005097423,0.00010471205,0.000382695,0.00035728634,0.000039135924,0.00040776157,0.5251528,0.07803979,0.00012473064,0.39015347,0.0015655718],"about_ca_topic_score_codex":0.00023934773,"about_ca_topic_score_gemma":0.00003721963,"teacher_disagreement_score":0.9697777,"about_ca_system_score_codex":0.0005659379,"about_ca_system_score_gemma":0.00006742199,"threshold_uncertainty_score":0.99989074},"labels":[],"label_agreement":null},{"id":"W1990847655","doi":"10.1109/ccece.2014.6901014","title":"Predictive algorithm for Volt/VAR optimization of distribution networks using Neural Networks","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; Simon Fraser University","funders":"","keywords":"Smart grid; Voltage reduction; Artificial neural network; Metering mode; Computer science; Genetic algorithm; Optimization problem; Model predictive control; Metrology; Reduction (mathematics); Volt; Voltage; Algorithm; Control (management); Engineering; Machine learning; Artificial intelligence; Electrical engineering; Mathematics","score_opus":0.006622732850591696,"score_gpt":0.1927688971000736,"score_spread":0.1861461642494819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990847655","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013329381,0.000048848746,0.9968655,0.0000068748386,0.0009758827,0.00022866137,0.0000119077795,0.00022854336,0.00030083215],"genre_scores_gemma":[0.9322552,0.000025117433,0.06645593,0.000024017634,0.0007343937,0.000036168665,0.00039722995,0.0000424762,0.000029475475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930507,0.000019059109,0.00021933492,0.00013723745,0.00009028572,0.0002290146],"domain_scores_gemma":[0.999646,0.00004899616,0.000036596677,0.00015660658,0.00006859071,0.00004318554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014761597,0.00012690712,0.0001492457,0.00003522393,0.000046497626,0.00001798203,0.00008422416,0.00008234308,0.0000142077915],"category_scores_gemma":[0.00001372884,0.00012989671,0.000055741617,0.00016296706,0.000020453363,0.00013148882,0.000033129665,0.00006247123,2.2000823e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004982228,0.000008704948,0.000067482586,0.000011047912,0.00004019241,9.788577e-8,0.0000050671374,0.9863771,0.0000032979144,0.00031545758,0.000811228,0.012355349],"study_design_scores_gemma":[0.00029880065,0.000051978433,0.00027426457,0.000012246963,0.000046972753,6.619489e-7,0.000009211069,0.99869823,0.00007574384,0.000013999369,0.00039415818,0.00012374145],"about_ca_topic_score_codex":0.000019956704,"about_ca_topic_score_gemma":0.0000031471482,"teacher_disagreement_score":0.93092227,"about_ca_system_score_codex":0.00007970699,"about_ca_system_score_gemma":0.0000021100482,"threshold_uncertainty_score":0.52970344},"labels":[],"label_agreement":null},{"id":"W1991008596","doi":"10.1109/tsg.2014.2374613","title":"A Framework for Volt-VAR Optimization in Distribution Systems","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":187,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Voltage reduction; Reduction (mathematics); Volt; Voltage; Capacitor; Control theory (sociology); AC power; Mathematical optimization; Voltage regulator; Integer programming; Demand response; Optimization problem; Linear programming; Engineering; Load management; Voltage regulation; Computer science; Mathematics; Electrical engineering; Electricity","score_opus":0.011355240703132636,"score_gpt":0.216007708051606,"score_spread":0.20465246734847337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991008596","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003532541,0.000027033437,0.98880804,0.00007860486,0.0063787214,0.00041521515,0.000085158455,0.00040702388,0.00026764063],"genre_scores_gemma":[0.9909034,0.00005864958,0.0078041027,0.00004210774,0.00039551206,0.00056890276,0.0000793641,0.000057246354,0.00009074436],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899995,0.000037731923,0.00029015695,0.00022641313,0.00015739791,0.00028833415],"domain_scores_gemma":[0.99943155,0.00013690766,0.000023889072,0.00030429644,0.00003733518,0.0000659992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021954521,0.00018346841,0.00019298919,0.0001539653,0.00009044302,0.000051164454,0.00011706255,0.00013968302,0.000023866485],"category_scores_gemma":[0.000013035844,0.0002046555,0.00008172985,0.0003214708,0.000017315195,0.00013979305,7.1639835e-7,0.0001890532,0.000036581136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019112003,0.000048492057,0.000017083341,0.000074542506,0.000030656676,5.137697e-7,0.0000306463,0.99612695,0.000031524076,0.0014285443,0.0009889379,0.0012029749],"study_design_scores_gemma":[0.00043099525,0.000064398424,0.00014214386,0.000092860995,0.000029240799,0.0000016084864,0.000024463101,0.9783293,0.0012406379,0.0000883573,0.019339122,0.00021684897],"about_ca_topic_score_codex":0.000051084608,"about_ca_topic_score_gemma":0.000047814672,"teacher_disagreement_score":0.98737085,"about_ca_system_score_codex":0.0002212473,"about_ca_system_score_gemma":0.0000069742227,"threshold_uncertainty_score":0.83456093},"labels":[],"label_agreement":null},{"id":"W1993328790","doi":"10.1109/tpwrs.2014.2388193","title":"Load Decomposition at Smart Meters Level Using Eigenloads Approach","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Metering mode; Computer science; Load balancing (electrical power); Real-time computing; Software deployment; Computation; Load management; Smart grid; Set (abstract data type); Electricity meter; Distributed computing; Electrical engineering; Engineering; Power (physics); Algorithm","score_opus":0.061942395581318935,"score_gpt":0.2483812222684498,"score_spread":0.18643882668713085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993328790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057907257,0.0001922538,0.92314786,0.000009812849,0.0075612203,0.00030490366,0.00003151792,0.0004886424,0.010356552],"genre_scores_gemma":[0.99688894,0.0000081574335,0.0019418027,0.000026115707,0.00003876886,0.00009273708,0.000007605128,0.00007507387,0.00092081894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846727,0.000069252535,0.00034362555,0.00029442116,0.00047665802,0.000348786],"domain_scores_gemma":[0.99921966,0.000023315102,0.000040571333,0.00044297913,0.00007418103,0.00019930684],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028719901,0.00027285362,0.0002589397,0.00022548011,0.00012624117,0.00007447963,0.00016831841,0.00012210188,0.000023538865],"category_scores_gemma":[0.0000012005851,0.00028949263,0.00011884136,0.0002815354,0.000027151473,0.00021733357,0.0000022282975,0.00015860947,0.00019925265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002220042,0.000059113114,0.000012224827,0.000051873085,0.00018870227,0.000006279286,0.0003955898,0.9937797,0.0028468587,0.000022137294,0.0025378142,0.00007749234],"study_design_scores_gemma":[0.0011475378,0.00011560501,0.00007274681,0.000096570024,0.00015675042,0.00013092652,0.00056100264,0.96063405,0.017458457,0.0000041442054,0.018917713,0.00070451567],"about_ca_topic_score_codex":0.0002889592,"about_ca_topic_score_gemma":0.00004367696,"teacher_disagreement_score":0.93898165,"about_ca_system_score_codex":0.0014839623,"about_ca_system_score_gemma":0.0000308904,"threshold_uncertainty_score":0.9999557},"labels":[],"label_agreement":null},{"id":"W1993901885","doi":"10.1109/pscc.2014.7038312","title":"Effect of price responsive demand on the operation of microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Microgrid; Price elasticity of demand; Demand response; Renewable energy; Peak demand; Elasticity (physics); Schedule; Load management; Electricity; Computer science; Energy storage; Scheduling (production processes); Mathematical optimization; Economics; Microeconomics; Engineering; Power (physics); Operations management; Electrical engineering; Mathematics","score_opus":0.002998659763456177,"score_gpt":0.1886178600285692,"score_spread":0.18561920026511303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993901885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95185757,0.000025061678,0.014788056,0.00009397885,0.00015735638,0.00014725862,6.4737475e-7,0.000044957796,0.032885116],"genre_scores_gemma":[0.9995624,0.000008442849,0.00016161663,0.000039144157,0.000032033204,0.0000108485365,0.0000012398026,0.000008172267,0.00017610194],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99962753,0.00008180662,0.00009964962,0.00005169321,0.000078836805,0.000060511862],"domain_scores_gemma":[0.99942964,0.00035043588,0.000014225613,0.00018121941,0.000014749168,0.00000973089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047061333,0.000056685534,0.000084312116,0.00003865635,0.000012027341,0.000004457822,0.00007657299,0.000018949642,0.00004465739],"category_scores_gemma":[0.00007281909,0.00003388891,0.000023734441,0.00006582217,0.000013840629,0.000020634234,0.00001776095,0.000030385934,0.000015538768],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000678421,0.000012907952,0.00037365034,0.00012962165,0.00007492278,2.8145513e-7,0.00011982048,0.88638014,0.086862735,0.015096809,0.007915722,0.0029655588],"study_design_scores_gemma":[0.00020703307,0.00029874145,0.0034191713,0.000019848976,0.0000139725225,2.5183e-7,0.0000094863735,0.07926612,0.9112737,0.000013345827,0.005428446,0.00004985594],"about_ca_topic_score_codex":0.000006199901,"about_ca_topic_score_gemma":0.0000031592283,"teacher_disagreement_score":0.824411,"about_ca_system_score_codex":0.000011440586,"about_ca_system_score_gemma":0.0000013905155,"threshold_uncertainty_score":0.13819498},"labels":[],"label_agreement":null},{"id":"W1996737203","doi":"10.1109/tsg.2014.2357346","title":"Autonomous Demand Response Using Stochastic Differential Games","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Qatar National Research Fund; McMaster University","keywords":"Demand response; News aggregator; Air conditioning; Computer science; Electricity; Nash equilibrium; Electricity market; Mathematical optimization; Renewable energy; Engineering; Mathematics; Electrical engineering","score_opus":0.011789215083668087,"score_gpt":0.2109104116866712,"score_spread":0.19912119660300312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996737203","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3353847,0.000012079539,0.65963316,0.000036646754,0.0041213427,0.00011573282,0.000012635602,0.00045700063,0.00022667479],"genre_scores_gemma":[0.9983018,0.0000070227175,0.00080345897,0.000059453967,0.00036806084,0.000052027175,0.000002999576,0.000080088605,0.00032508295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986764,0.000108362925,0.00028768976,0.00029351277,0.00023952915,0.00039447396],"domain_scores_gemma":[0.99918145,0.00017857543,0.000029007851,0.00044794928,0.000024799741,0.00013821537],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021324307,0.00028684398,0.00025207,0.0003094626,0.0001844635,0.00006349793,0.000175457,0.00009979804,0.00020906565],"category_scores_gemma":[0.0000074182162,0.00030422994,0.00013616758,0.00020617203,0.00005330943,0.00013212227,0.000002155598,0.00024945967,0.00015276928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012983911,0.000053081465,0.000004029856,0.000020795876,0.00009452609,0.0000034554273,0.00008407547,0.9899885,0.0071452367,0.000020195159,0.00039714837,0.0020591142],"study_design_scores_gemma":[0.0007791157,0.00012287246,0.001031309,0.00004918167,0.00013307751,0.000017631486,0.00002090963,0.974004,0.01771382,0.000027194314,0.005667039,0.00043387813],"about_ca_topic_score_codex":0.000025637893,"about_ca_topic_score_gemma":0.00003108419,"teacher_disagreement_score":0.6629171,"about_ca_system_score_codex":0.00018443097,"about_ca_system_score_gemma":0.000017501558,"threshold_uncertainty_score":0.999941},"labels":[],"label_agreement":null},{"id":"W1997898472","doi":"10.1016/j.epsr.2008.04.002","title":"A summary of demand response in electricity markets","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1837,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity; Electricity demand; Electricity market; Demand forecasting; Environmental economics; Economics; Microeconomics; Operations research; Business; Engineering; Electricity generation; Operations management; Power (physics); Electrical engineering","score_opus":0.026356077311784673,"score_gpt":0.2723813122681655,"score_spread":0.2460252349563808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997898472","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97019523,0.0075322636,0.0018863095,0.000028839755,0.00031437035,0.00053524855,0.0000020575249,0.00014262427,0.019363074],"genre_scores_gemma":[0.9969748,0.00083228434,0.00002202557,0.000004085172,0.000043106884,0.00012657311,0.0000017990252,0.00004777607,0.0019475096],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9962292,0.0010323755,0.0005020097,0.00029892818,0.0010002023,0.0009373144],"domain_scores_gemma":[0.99854106,0.0006331152,0.000033805863,0.0005169154,0.0001544057,0.000120694494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004619536,0.0001770544,0.00035680635,0.0018858501,0.00008477584,0.000021433269,0.00043123207,0.00013278202,0.000026653499],"category_scores_gemma":[0.00045516712,0.00018203237,0.000058100868,0.0036070934,0.00005304808,0.00011935085,0.000083629624,0.00056518783,0.00005137535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008090572,0.001002578,0.043361988,0.0015929027,0.0007931399,0.0036403125,0.0026305215,0.261915,0.22635874,0.0014926399,0.4474056,0.0017160075],"study_design_scores_gemma":[0.0028698663,0.0012637924,0.5250642,0.00039712136,0.000012644109,0.00030463352,0.00016058054,0.35474694,0.03668354,0.000076517834,0.07738864,0.0010315495],"about_ca_topic_score_codex":0.0002885872,"about_ca_topic_score_gemma":0.000011572584,"teacher_disagreement_score":0.4817022,"about_ca_system_score_codex":0.0005716675,"about_ca_system_score_gemma":0.0001457752,"threshold_uncertainty_score":0.7423064},"labels":[],"label_agreement":null},{"id":"W1998115190","doi":"10.3390/s140100848","title":"NodePM: A Remote Monitoring Alert System for Energy Consumption Using Probabilistic Techniques","year":2014,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Real-time computing; Novelty detection; Probabilistic logic; Energy consumption; Power consumption; Electricity meter; Markov chain; Entropy (arrow of time); Smart grid; Wireless sensor network; Smart meter; Novelty; Embedded system; Artificial intelligence; Machine learning; Power (physics); Engineering; Computer network; Electrical engineering","score_opus":0.022362742521795397,"score_gpt":0.2330455566000565,"score_spread":0.2106828140782611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998115190","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66185623,0.00006815078,0.3314152,0.000012383266,0.0016419621,0.00031843391,0.0000035616172,0.0019658965,0.002718142],"genre_scores_gemma":[0.9738612,0.00001872691,0.025311332,0.000006299287,0.00059966464,0.00002877793,0.00000456866,0.000070363974,0.00009906663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915445,0.000030172778,0.00021847594,0.00020192226,0.00012533812,0.00026967117],"domain_scores_gemma":[0.9995201,0.00006514724,0.000036638085,0.00028268297,0.000042443855,0.00005295547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017766516,0.00016744813,0.00017815268,0.00011542487,0.00006875319,0.000030626037,0.00009608279,0.00007927904,0.0000019333052],"category_scores_gemma":[0.000033235505,0.00017981303,0.000057138404,0.000083992716,0.000019918138,0.00005161973,0.000025908923,0.00005279319,0.0000067658925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011543367,0.0000068669983,0.000267777,0.0008601111,0.00006411603,0.0000037041402,0.00005029508,0.96292436,0.016844776,0.0027381342,0.00013340027,0.016094921],"study_design_scores_gemma":[0.00014725444,0.000018171004,0.00016446138,0.0002463757,0.000040940165,0.000010160537,0.000027459135,0.92763764,0.062399276,0.000074456846,0.00900872,0.00022507069],"about_ca_topic_score_codex":0.00007364527,"about_ca_topic_score_gemma":0.000007843872,"teacher_disagreement_score":0.31200495,"about_ca_system_score_codex":0.00029136005,"about_ca_system_score_gemma":0.000003780577,"threshold_uncertainty_score":0.7332562},"labels":[],"label_agreement":null},{"id":"W1998161285","doi":"10.1080/15325008.2013.832439","title":"Smart Home Activities: A Literature Review","year":2014,"lang":"en","type":"review","venue":"Electric Power Components and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":183,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Home automation; Energy management; Smart grid; Scheduling (production processes); Electricity; Energy management system; Computer science; Automation; Operations research; Engineering; Operations management; Energy (signal processing); Telecommunications; Electrical engineering","score_opus":0.014553578967408493,"score_gpt":0.23490451698406098,"score_spread":0.22035093801665248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998161285","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000004821872,0.99072057,0.00028845872,0.000006914573,0.0031387475,0.0010210457,0.000020228932,0.00033190378,0.0044673337],"genre_scores_gemma":[0.00014879313,0.9975035,0.000007697662,0.000052232284,0.00038425304,0.00033475863,0.00014844157,0.00013773603,0.0012825932],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976257,0.00024169404,0.00078444206,0.00046347297,0.00035690475,0.0005277747],"domain_scores_gemma":[0.9988482,0.00012599856,0.0001930704,0.00064753875,0.00002572589,0.00015945126],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004330758,0.0007101548,0.0025744382,0.00041857653,0.000070845475,0.00022010722,0.00037005977,0.00027762292,0.000017491888],"category_scores_gemma":[0.000012626606,0.00056210055,0.00033355935,0.00070854987,0.000013020005,0.00010732244,0.000080760554,0.00053826784,0.00008699872],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025230167,0.00003859471,0.000001671903,0.5978635,0.0015291937,0.00012434351,0.000053537857,0.000077023826,0.0000038451476,0.0006970388,0.09035966,0.3092491],"study_design_scores_gemma":[0.00009413431,0.000027880209,0.0000021074602,0.11316453,0.00031377972,0.00017696165,8.012082e-7,0.0007155918,4.793315e-8,0.0000016338736,0.8849829,0.00051964],"about_ca_topic_score_codex":0.000005756964,"about_ca_topic_score_gemma":2.952962e-7,"teacher_disagreement_score":0.79462326,"about_ca_system_score_codex":0.00019404598,"about_ca_system_score_gemma":0.000019885336,"threshold_uncertainty_score":0.999683},"labels":[],"label_agreement":null},{"id":"W1998249080","doi":"10.1109/mpe.2012.2212617","title":"DC Versus AC: The Second War of Currents Has Already Begun [In My View]","year":2012,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presumption; Electricity; Electrical engineering; Power (physics); Power engineering; Engineering; Power flow; Mains electricity; Electric power system; Computer science; Political science; Voltage; Law; Physics; Power factor","score_opus":0.0180359284266145,"score_gpt":0.22154080704307338,"score_spread":0.20350487861645888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998249080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84972155,0.009854642,0.0013932587,0.00021859015,0.010945967,0.00010951585,0.00002904546,0.00018466041,0.1275428],"genre_scores_gemma":[0.99766225,0.00048406297,0.00006492707,0.000071230286,0.00023553902,0.000026167136,0.000011990555,0.000036978727,0.0014068816],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99897665,0.000029537507,0.00026277232,0.0001544058,0.00016911098,0.00040750924],"domain_scores_gemma":[0.9994617,0.00006051686,0.000032665215,0.0003299797,0.000018928313,0.00009619315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018383123,0.00020919167,0.0002338924,0.00010849377,0.000040149123,0.000015850737,0.00018168103,0.0000646998,0.00036283984],"category_scores_gemma":[0.000007955039,0.0001659077,0.000053349733,0.00019442107,0.000073725445,0.00018251703,0.00006352205,0.00011362326,0.00004979044],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059771,0.001275427,0.018320378,0.0009684256,0.0019533024,0.000061635605,0.007242586,0.23469816,0.032896806,0.019033704,0.6042108,0.07874107],"study_design_scores_gemma":[0.0012180554,0.00005801091,0.014824968,0.000031305433,0.000036048386,0.0000042207957,0.000059834852,0.0028700875,0.0068855,0.000045203386,0.97368276,0.0002840016],"about_ca_topic_score_codex":0.00004116069,"about_ca_topic_score_gemma":0.0002610001,"teacher_disagreement_score":0.36947197,"about_ca_system_score_codex":0.000038436956,"about_ca_system_score_gemma":0.0000059560566,"threshold_uncertainty_score":0.67655194},"labels":[],"label_agreement":null},{"id":"W1999395055","doi":"10.1109/epec.2014.11","title":"Accommodating High Levels of Renewable Generation in Remote Microgrids under Uncertainty","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Flexibility (engineering); Intermittency; Computer science; Grid; Probabilistic logic; Reliability engineering; Wind power; Energy storage; Electricity generation; Electric power system; Renewable resource; Distributed generation; Power (physics); Engineering; Electrical engineering","score_opus":0.021869472983349014,"score_gpt":0.22066467023512606,"score_spread":0.19879519725177705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999395055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6909595,0.000023686884,0.29667264,0.00011517152,0.00032963694,0.00007582287,0.0000016723671,0.00013492431,0.01168694],"genre_scores_gemma":[0.9823075,0.0000074834525,0.01710728,0.00008636327,0.00014711345,0.0000027643482,0.00001773279,0.000020833497,0.00030294163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931705,0.00002932602,0.0002507157,0.00012768054,0.00010235765,0.00017289813],"domain_scores_gemma":[0.9996494,0.000031860265,0.00002508036,0.0002489725,0.000020476933,0.000024176385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026117382,0.0001013113,0.00014073976,0.00010494849,0.000018102759,0.000016559869,0.000110765235,0.00004940877,0.00010306752],"category_scores_gemma":[0.000017394726,0.000101532765,0.000023289665,0.00017996161,0.000010950249,0.000089669615,0.00004496328,0.000055335036,0.0000084276435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.2939596e-7,0.000005733869,0.000104204606,0.00001918451,0.000012149935,2.0609667e-7,0.000019938368,0.93782985,0.051568307,0.0018388339,0.0011457716,0.007454974],"study_design_scores_gemma":[0.0002756065,0.000011300892,0.0035240615,0.000015085047,0.0000048382103,3.5721536e-7,0.000027690045,0.9182605,0.07520562,0.0005511973,0.0020023426,0.00012141071],"about_ca_topic_score_codex":0.0020331382,"about_ca_topic_score_gemma":0.0015350981,"teacher_disagreement_score":0.291348,"about_ca_system_score_codex":0.00008612948,"about_ca_system_score_gemma":0.0000051529514,"threshold_uncertainty_score":0.4140386},"labels":[],"label_agreement":null},{"id":"W1999581927","doi":"10.1016/j.rser.2015.03.033","title":"A review of demand side management business models in the electricity market","year":2015,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":313,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Independent Electricity System Operator","keywords":"Demand response; Environmental economics; Value proposition; Renewable energy; Smart grid; Database transaction; Business model; Electricity market; Electricity; Business; Load shifting; Industrial organization; Computer science; Economics; Engineering; Electrical engineering; Marketing","score_opus":0.02555825084103646,"score_gpt":0.25498175909406295,"score_spread":0.2294235082530265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999581927","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[5.7913457e-8,0.9115895,0.004006034,0.000020169426,0.000099291996,0.0016222653,0.0000036055346,0.000054560336,0.08260449],"genre_scores_gemma":[9.008422e-7,0.990236,0.00024860518,0.000270215,0.00010659501,0.0016275428,0.00008077877,0.000096719144,0.0073326356],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957128,0.0007382488,0.0016855233,0.0005566652,0.00039992522,0.0009068397],"domain_scores_gemma":[0.9980174,0.00012639187,0.0003817192,0.0011863442,0.00017121635,0.000116981864],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0047611445,0.0008090314,0.003525343,0.0005419826,0.00007585493,0.00006696425,0.0008422187,0.00021955851,0.000024973113],"category_scores_gemma":[0.00008786106,0.0005406119,0.00037390614,0.0030911048,0.000047485686,0.00026251868,0.00033986152,0.00024937384,0.000002972236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001841124,0.00003411984,1.2368668e-7,0.47226903,0.00012632241,0.000085427215,0.00001057969,0.009271299,8.641638e-9,0.0026686953,0.12543613,0.39009643],"study_design_scores_gemma":[0.00015398086,0.000016411372,2.8494946e-7,0.084841415,0.000926498,0.000032658136,0.00003674783,0.0010382956,1.3089159e-7,0.00095034146,0.91152763,0.00047559003],"about_ca_topic_score_codex":0.00069733843,"about_ca_topic_score_gemma":0.000093103714,"teacher_disagreement_score":0.7860915,"about_ca_system_score_codex":0.00039685427,"about_ca_system_score_gemma":0.00014035993,"threshold_uncertainty_score":0.99970454},"labels":[],"label_agreement":null},{"id":"W2000588675","doi":"10.1109/iecon.2012.6389115","title":"A review on energy efficiency optimization in Smart Grid","year":2012,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Smart grid; Efficient energy use; Electricity; Production (economics); Electricity generation; Energy consumption; Computer science; Distributed generation; Energy storage; Energy accounting; Energy (signal processing); Greenhouse gas; Energy engineering; Consumption (sociology); Energy supply; Process engineering; Environmental science; Renewable energy; Engineering; Electrical engineering; Economics; Power (physics); Microeconomics","score_opus":0.030515120865468724,"score_gpt":0.2559327923802726,"score_spread":0.22541767151480388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000588675","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.9596958e-9,0.92831784,0.011304116,0.000008146274,0.0014279144,0.00033699276,0.0000028469926,0.00028035956,0.058321796],"genre_scores_gemma":[2.1162795e-7,0.99772483,0.00053174776,0.00022735844,0.00032201063,0.00034322214,0.0001868226,0.00010258005,0.0005611975],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984564,0.00008149351,0.00062641856,0.00027657577,0.00018230073,0.00037678098],"domain_scores_gemma":[0.999252,0.000057653415,0.00007170883,0.0005298184,0.000012043967,0.00007674789],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002824206,0.00044753106,0.0011151154,0.0003655042,0.000016041036,0.000017229244,0.00029673596,0.00016336954,0.0005149135],"category_scores_gemma":[0.000017429698,0.0003633449,0.00022373533,0.00074059295,0.000009175344,0.00007328174,0.000068891284,0.00019765443,0.0002467842],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.4565184e-7,0.000031003194,1.295947e-7,0.046518654,0.000037815058,0.0000033358863,0.0000014253312,0.23891726,1.540727e-9,0.00092477637,0.015436098,0.69812936],"study_design_scores_gemma":[0.000041901723,0.000009321575,1.6785685e-7,0.03981954,0.00022261112,0.0000035734554,2.6032555e-7,0.006748436,9.9017186e-8,6.353932e-7,0.9528047,0.00034876066],"about_ca_topic_score_codex":0.000021899972,"about_ca_topic_score_gemma":0.00001789874,"teacher_disagreement_score":0.9373686,"about_ca_system_score_codex":0.00029087014,"about_ca_system_score_gemma":0.000019420431,"threshold_uncertainty_score":0.99988186},"labels":[],"label_agreement":null},{"id":"W2001460357","doi":"10.1109/smartgridcomm.2014.7007635","title":"Optimal energy management for building microgrid with constrained renewable energy utilization","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"","keywords":"Microgrid; Renewable energy; Computer science; Energy management; Energy storage; Energy engineering; Demand response; Electricity; Environmental economics; Energy (signal processing); Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.009024841348890263,"score_gpt":0.19410977006592803,"score_spread":0.18508492871703777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001460357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001328698,0.00007734383,0.9378225,0.0000460419,0.00031795344,0.000106622174,0.0000024666501,0.0005935149,0.059704818],"genre_scores_gemma":[0.7692639,0.00017681338,0.2238772,0.00034260648,0.0003075414,0.00030772254,0.00010189358,0.000117401156,0.005504891],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892294,0.000014219011,0.0002201122,0.0002909663,0.00015512938,0.00039660427],"domain_scores_gemma":[0.9995075,0.000038898706,0.00003145461,0.00029965525,0.00004061258,0.00008188576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012431994,0.00023113182,0.00018295056,0.00016887017,0.00007995907,0.00006635808,0.00017557392,0.000054879507,0.00007248742],"category_scores_gemma":[0.000003773326,0.00021479814,0.00005103886,0.00021001208,0.000033082037,0.000117467884,0.000052072453,0.000025065374,0.0000022560785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017604358,0.000016131182,0.000019577723,0.00005833703,0.00014428915,0.0000021669284,0.0000065963177,0.8707325,0.0009110359,0.10190544,0.013146312,0.013040007],"study_design_scores_gemma":[0.0006732187,0.00006440896,0.000024934961,0.00002371114,0.00004182546,0.0000032376252,0.000029711446,0.49453428,0.028778221,0.00018956893,0.47539476,0.00024211835],"about_ca_topic_score_codex":0.00015665789,"about_ca_topic_score_gemma":0.00021711562,"teacher_disagreement_score":0.7679352,"about_ca_system_score_codex":0.00007304438,"about_ca_system_score_gemma":0.0000052264936,"threshold_uncertainty_score":0.8759214},"labels":[],"label_agreement":null},{"id":"W2001581725","doi":"10.1109/wf-iot.2014.6803184","title":"A modular framework for cost optimization in smart grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Modular design; Smart grid; Computer science; Distributed computing; Grid; Demand response; Energy consumption; Dependency (UML); Distributed generation; Electric power system; Optimization problem; Electricity generation; Embedded system; Industrial engineering; Power (physics); Renewable energy; Electricity; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.008724237931077246,"score_gpt":0.20664663499775124,"score_spread":0.197922397066674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001581725","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025058016,0.0000126003715,0.98700213,0.00011841715,0.00074440066,0.00021375663,9.892625e-7,0.00023552199,0.009166385],"genre_scores_gemma":[0.577818,0.00002817422,0.42078292,0.00031798967,0.00040739228,0.00029460015,0.00003870701,0.000055529756,0.00025672693],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995542,0.0000074773197,0.00011501105,0.000103831764,0.000060025555,0.00015945993],"domain_scores_gemma":[0.99973005,0.000052305833,0.0000075729426,0.00017026709,0.000011225589,0.000028575298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012012963,0.000077619516,0.00008471774,0.00007598413,0.000014464839,0.000019063185,0.0000764221,0.000052947456,0.000073218274],"category_scores_gemma":[0.000052469495,0.00008076815,0.000022851964,0.00012089357,0.000004891813,0.00006220957,0.00001673245,0.00004939281,0.000017811803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018662203,0.0000065627814,0.0002726454,0.000019085543,0.000007420484,1.8814677e-7,0.000013868402,0.97237897,0.000013416978,0.024305213,0.0018223594,0.0011584014],"study_design_scores_gemma":[0.00019752499,0.000010321656,0.0009586222,0.000013806424,0.0000035919702,1.3220611e-7,0.000007384409,0.9550194,0.0002570335,0.00109428,0.042339023,0.0000988776],"about_ca_topic_score_codex":0.000011373115,"about_ca_topic_score_gemma":0.00002709523,"teacher_disagreement_score":0.57531214,"about_ca_system_score_codex":0.000046379366,"about_ca_system_score_gemma":0.0000014513369,"threshold_uncertainty_score":0.32936293},"labels":[],"label_agreement":null},{"id":"W2001816095","doi":"10.1109/smartgridcomm.2014.7007661","title":"A novel distributed algorithm for power loss minimizing in Smart Grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Science and Engineering Research Board; Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart grid; Power grid; Distributed computing; Distributed algorithm; Algorithm; Power (physics); Electrical engineering; Engineering","score_opus":0.007859036967430502,"score_gpt":0.19738279715932178,"score_spread":0.18952376019189127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001816095","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008550263,0.000015146148,0.9834969,0.000129447,0.001115787,0.00017028252,0.000034269986,0.00030412283,0.006183756],"genre_scores_gemma":[0.8058762,0.0000106603675,0.1920215,0.00033699372,0.0005190015,0.00026429398,0.00022550291,0.00011015755,0.00063567696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992034,0.0000058636674,0.00020240498,0.000172522,0.000096732656,0.00031910447],"domain_scores_gemma":[0.9996293,0.000072992094,0.0000131363895,0.00021039513,0.000019553765,0.000054619228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017790658,0.00014180614,0.00015702879,0.000093682684,0.000021779511,0.00002707615,0.00013259948,0.00005298041,0.00004824066],"category_scores_gemma":[0.00002894596,0.00014227659,0.000051039613,0.0001648934,0.000012358391,0.00008216948,0.000044375447,0.00006431773,0.000024073694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027007756,0.00032925737,0.0032823533,0.00022376636,0.00030318732,0.000017987655,0.00029925496,0.78924674,0.0032369285,0.015081874,0.114524536,0.07342709],"study_design_scores_gemma":[0.0009803908,0.000025342097,0.0053992425,0.000017084889,0.0000077665845,0.000002250654,0.000034624343,0.7754973,0.001317797,0.0000613907,0.21642442,0.0002323661],"about_ca_topic_score_codex":0.00003865241,"about_ca_topic_score_gemma":0.00007324246,"teacher_disagreement_score":0.79732597,"about_ca_system_score_codex":0.000080162485,"about_ca_system_score_gemma":0.0000034273273,"threshold_uncertainty_score":0.58018714},"labels":[],"label_agreement":null},{"id":"W2005154127","doi":"10.1109/ccece.2012.6334913","title":"A wireless sensor network for residential electrical energy consumption measurement","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Wireless sensor network; Ethernet; Microcontroller; Wireless; Energy consumption; Computer science; Key distribution in wireless sensor networks; Battery (electricity); Wi-Fi array; Transmitter; Electrical engineering; Computer network; Embedded system; Wireless network; Engineering; Telecommunications","score_opus":0.026864364974529042,"score_gpt":0.2162157072541231,"score_spread":0.18935134227959405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005154127","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0257022,0.00096422026,0.9641046,0.00007464905,0.0024923354,0.0002346454,0.0000015952961,0.0007232579,0.0057024905],"genre_scores_gemma":[0.99320865,0.00010823755,0.0041579455,0.00011193369,0.0018042834,0.00014904942,0.000010537759,0.00004402866,0.00040533804],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885267,0.00002408977,0.00019214803,0.00012210617,0.00027477214,0.00053420704],"domain_scores_gemma":[0.9996258,0.000036959107,0.000017973722,0.00017000109,0.000042931133,0.000106310334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000319716,0.00013842461,0.00013339281,0.00005802035,0.000058327114,0.000025233465,0.00008047077,0.00006404948,0.000117750744],"category_scores_gemma":[0.000011492261,0.00013795162,0.00006509728,0.00010667077,0.000010292571,0.00010469753,0.000022852195,0.000049133007,0.00004151608],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118849784,0.00011022011,0.0054564835,0.000121900295,0.00050867343,0.0000026432228,0.000053792148,0.33426738,0.005603576,0.0861126,0.5513812,0.016262677],"study_design_scores_gemma":[0.0015192709,0.00008224948,0.017917909,0.000040844156,0.00019805897,0.000010893991,0.000016244505,0.48863834,0.033895127,0.00033415644,0.45647225,0.0008746469],"about_ca_topic_score_codex":0.000027322685,"about_ca_topic_score_gemma":0.000068950234,"teacher_disagreement_score":0.96750647,"about_ca_system_score_codex":0.00018825165,"about_ca_system_score_gemma":0.000006000686,"threshold_uncertainty_score":0.56255037},"labels":[],"label_agreement":null},{"id":"W2005399662","doi":"10.1109/smartgridcomm.2014.7007636","title":"Coordinated dispatch of renewable energy sources and HVAC load using stochastic programming","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"HVAC; Dispatchable generation; Renewable energy; Demand response; Virtual power plant; Computer science; Wind power; Stochastic programming; Grid; Air conditioning; Automotive engineering; Electric power system; Solar power; Reliability engineering; Mathematical optimization; Electricity; Power (physics); Engineering; Distributed generation; Electrical engineering; Mechanical engineering","score_opus":0.006771273974140371,"score_gpt":0.18436504099282316,"score_spread":0.1775937670186828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005399662","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25260702,0.000197942,0.74250174,0.000013060844,0.00018217851,0.000058227342,4.899378e-7,0.00026380646,0.0041755512],"genre_scores_gemma":[0.994866,0.0000066250277,0.004431113,0.000011115737,0.00005808246,0.00000919049,0.0000025335735,0.000030364577,0.00058498135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930185,0.000014682753,0.00017657562,0.00014619331,0.00013189697,0.00022882038],"domain_scores_gemma":[0.99966294,0.000038762435,0.000029114126,0.00017530886,0.000034161032,0.000059690643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012848589,0.00013191733,0.00017500288,0.00007667384,0.00003814289,0.000028484308,0.00008593377,0.000042551812,0.000024254072],"category_scores_gemma":[0.000022826222,0.00012544518,0.000024192417,0.000174252,0.00003571726,0.000076334276,0.00007058536,0.000033760945,0.000001016326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031046297,0.000010767181,0.00052750506,0.00006132125,0.000043753545,5.4850705e-7,0.000049594666,0.99134976,0.0025176841,0.0005984262,0.0002726919,0.0045648497],"study_design_scores_gemma":[0.00027172602,0.00003313812,0.00026207577,0.000045940043,0.0000334463,0.0000023811715,0.000076356526,0.9850462,0.006365168,0.00015101071,0.0075318194,0.00018074817],"about_ca_topic_score_codex":0.003242442,"about_ca_topic_score_gemma":0.000569413,"teacher_disagreement_score":0.74225897,"about_ca_system_score_codex":0.000043272346,"about_ca_system_score_gemma":0.0000059589142,"threshold_uncertainty_score":0.5115506},"labels":[],"label_agreement":null},{"id":"W2006920596","doi":"10.1109/tsg.2014.2363119","title":"Open Energy Market Strategies in Microgrids: A Stackelberg Game Approach Based on a Hybrid Multiobjective Evolutionary Algorithm","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Renewable energy; Computer science; Exploit; Stackelberg competition; Mathematical optimization; Evolutionary algorithm; Leverage (statistics); Multi-objective optimization; Context (archaeology); Profit (economics); Smart grid; Environmental economics; Economics; Engineering; Microeconomics; Artificial intelligence; Mathematics","score_opus":0.008106613428118603,"score_gpt":0.20606853042354162,"score_spread":0.197961916995423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006920596","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002692734,0.00004198064,0.9647869,0.00009311971,0.0021057297,0.0005213441,0.00017333722,0.00046550843,0.029119378],"genre_scores_gemma":[0.9771597,0.00008382908,0.01982865,0.00046674753,0.0003276723,0.0011717214,0.0000897594,0.00015209563,0.00071983214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975583,0.00022978314,0.0004873193,0.0006990298,0.00041215957,0.000613391],"domain_scores_gemma":[0.99876624,0.00021017119,0.000056780802,0.0007284614,0.00007749696,0.00016084136],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003888207,0.0005068112,0.0004451071,0.0006772454,0.00014858926,0.00019358676,0.00061135914,0.00013291716,0.00021342882],"category_scores_gemma":[0.000006946956,0.00054986234,0.00017557509,0.00058622746,0.00008733746,0.0005164399,0.000009921546,0.00045642123,0.000059370883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014502382,0.00061973266,0.000010082506,0.000044173004,0.00011480403,0.000015593154,0.00007168362,0.9622004,0.000110920024,0.00007937573,0.008885635,0.027702553],"study_design_scores_gemma":[0.0019529865,0.00024337204,0.0011120577,0.00008539101,0.00004085045,0.00001118677,0.00019991113,0.9519963,0.004183846,0.00011808605,0.039451696,0.00060426694],"about_ca_topic_score_codex":0.0008023665,"about_ca_topic_score_gemma":0.00034900737,"teacher_disagreement_score":0.974467,"about_ca_system_score_codex":0.00054571667,"about_ca_system_score_gemma":0.00008707444,"threshold_uncertainty_score":0.9996953},"labels":[],"label_agreement":null},{"id":"W2007462323","doi":"10.1109/i2mtc.2012.6229453","title":"Nonintrusive load monitoring of electrical devices in health smart homes","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Electrical load; Classifier (UML); Profiling (computer programming); Real-time computing; Voltage; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.011026594832035518,"score_gpt":0.23794249904784204,"score_spread":0.2269159042158065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007462323","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9733957,0.0039435048,0.002735511,0.00011695689,0.0011075676,0.00014091481,5.29651e-7,0.00022748354,0.018331802],"genre_scores_gemma":[0.9969688,0.00021045501,0.0024558827,0.000026486825,0.00018540517,0.000012412556,7.623654e-7,0.00001673839,0.00012307825],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99914235,0.000017102273,0.00023407188,0.00007670375,0.00016364532,0.00036610974],"domain_scores_gemma":[0.99971294,0.000041229912,0.000024657742,0.00012913528,0.000014495669,0.00007753841],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002219687,0.00009536202,0.00016949403,0.00012236941,0.000012747429,0.0000063715584,0.00009124876,0.000031179636,0.000043759683],"category_scores_gemma":[0.000013380053,0.00009180911,0.000025634503,0.00027719582,0.000008044982,0.00013525042,0.00003217132,0.000084090745,0.000027025806],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056091176,0.000068286085,0.9272449,0.00020468884,0.00005873928,0.0000017880443,0.00051907473,0.056195337,0.00033929897,0.0031214342,0.0015459972,0.010694862],"study_design_scores_gemma":[0.000395288,0.0000509944,0.94743246,0.00008144406,0.000006953502,0.0000022338695,0.0002746849,0.011837036,0.016791489,0.00002675198,0.022844806,0.00025585789],"about_ca_topic_score_codex":0.00033969447,"about_ca_topic_score_gemma":0.00007184129,"teacher_disagreement_score":0.044358302,"about_ca_system_score_codex":0.00025639322,"about_ca_system_score_gemma":0.000016771428,"threshold_uncertainty_score":0.3743867},"labels":[],"label_agreement":null},{"id":"W2008800859","doi":"10.1109/ifsa-nafips.2013.6608437","title":"Genetic optimization of a fuzzy control system for energy flow management in micro-grids","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Microgrid; Fuzzy logic; Computer science; Energy management; Genetic algorithm; Fuzzy control system; Energy storage; Controller (irrigation); Energy management system; Control engineering; Grid; Smart grid; Energy (signal processing); Power (physics); Control (management); Engineering; Electrical engineering; Artificial intelligence","score_opus":0.003324641379228141,"score_gpt":0.156444654595254,"score_spread":0.15312001321602586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2008800859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066211075,0.0001406327,0.9743221,0.00003160271,0.0004195357,0.0005618536,0.000003493182,0.00018881685,0.017710907],"genre_scores_gemma":[0.8689936,0.000051057737,0.12968297,0.000043679865,0.00006327512,0.0007078072,0.000010083231,0.000037382237,0.00041017434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921364,0.0000134860875,0.0003154889,0.0001454413,0.00009560098,0.00021631802],"domain_scores_gemma":[0.9996627,0.000021374943,0.000026330104,0.00021964018,0.000035121884,0.000034827845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006444317,0.00012906271,0.00018086354,0.00018808832,0.000012123837,0.000019708166,0.0001284324,0.00004372372,0.000051050512],"category_scores_gemma":[0.0000018768184,0.00012785285,0.00004725273,0.0001493566,0.000008253079,0.00006707569,0.000026201802,0.000018765673,0.000010557565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004684307,0.000014742973,0.00009639658,0.000277781,0.00009650231,0.0000014402054,0.0000117264335,0.9909207,0.0004963875,0.0027053081,0.0023277935,0.0030465063],"study_design_scores_gemma":[0.001156822,0.000020163512,0.0011575844,0.000035044606,0.000028979657,7.2013904e-7,0.000082109706,0.9948835,0.0012739743,0.000036399168,0.0011904001,0.0001343215],"about_ca_topic_score_codex":0.00012006982,"about_ca_topic_score_gemma":0.000027314316,"teacher_disagreement_score":0.86237246,"about_ca_system_score_codex":0.00011020454,"about_ca_system_score_gemma":0.0000024053234,"threshold_uncertainty_score":0.52136874},"labels":[],"label_agreement":null},{"id":"W2009766558","doi":"10.1109/waina.2015.128","title":"Demand Response: From Classification to Optimization Techniques in Smart Grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Prosumer; Demand response; Computer science; Grid; Distributed generation; Electric power system; Electric power industry; Electric utility; Electricity; Distributed computing; Power (physics); Engineering; Renewable energy; Electrical engineering","score_opus":0.025077826871615146,"score_gpt":0.23468093699169174,"score_spread":0.2096031101200766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009766558","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10711267,0.00003334835,0.8702188,0.00077634025,0.00046155983,0.00024023147,0.0000029000705,0.00083467545,0.020319473],"genre_scores_gemma":[0.8778415,0.00001990312,0.12102513,0.00020961776,0.0001628335,0.00013825821,0.000049622875,0.000035255558,0.0005179175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994466,0.000038107853,0.00015593323,0.00013185415,0.00011415371,0.000113359754],"domain_scores_gemma":[0.99965304,0.000029807092,0.000009599883,0.00021223302,0.0000259995,0.000069308146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030915276,0.000081184335,0.000077501536,0.00017959424,0.000009023876,0.000026466625,0.00009520131,0.000048788836,0.00004455058],"category_scores_gemma":[0.00006014854,0.00008438816,0.000010194863,0.0002463704,0.0000051253983,0.00011751889,0.00003111071,0.000043795917,0.000060436178],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044917375,0.0000090934345,0.0013307291,0.0000020864022,0.000005542231,0.0000017066432,0.000106440864,0.96677285,0.0014090523,0.00015191942,0.029368067,0.00079757284],"study_design_scores_gemma":[0.0002719016,0.000041432708,0.036138855,0.00002345092,0.0000061616142,4.2659678e-7,0.00015297976,0.8563193,0.017646996,0.000112039226,0.08905422,0.00023222614],"about_ca_topic_score_codex":0.000097492695,"about_ca_topic_score_gemma":0.00010851799,"teacher_disagreement_score":0.77072877,"about_ca_system_score_codex":0.00018422221,"about_ca_system_score_gemma":0.0000086416185,"threshold_uncertainty_score":0.3441249},"labels":[],"label_agreement":null},{"id":"W2010036759","doi":"10.1109/ccece.2014.6900995","title":"A decentralised electricity market model: An electric vehicle charging example","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Electricity market; Electricity; Industrial organization; Electric vehicle; Market clearing; Upgrade; Service (business); Computer science; Business; Microeconomics; Economics; Engineering; Marketing","score_opus":0.01108474281165978,"score_gpt":0.1916182282544926,"score_spread":0.18053348544283282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010036759","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52068305,0.000047899935,0.40395954,0.000045523346,0.00016707709,0.00015385692,6.654565e-7,0.0015088877,0.0734335],"genre_scores_gemma":[0.9964465,0.00004780559,0.0024138754,0.00025785455,0.00013488412,0.00003063293,0.000007846719,0.00006123749,0.0005993526],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987303,0.000044118427,0.00018860854,0.00026061854,0.0002004676,0.0005758611],"domain_scores_gemma":[0.99937505,0.000041625506,0.000017472834,0.00039281588,0.000022807608,0.00015024196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030279174,0.00018902645,0.00016667494,0.00016596609,0.00006718006,0.000059240207,0.00023865914,0.000056937162,0.0002658131],"category_scores_gemma":[0.000019127807,0.00019470557,0.000045662204,0.00043018186,0.000006373585,0.00023350159,0.000029207635,0.00012302087,0.000040256888],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012037643,0.000045443772,0.0006607785,0.000027647862,0.00004203343,0.0000016750832,0.000060626386,0.9471117,0.019519728,0.008134034,0.016601957,0.0077822995],"study_design_scores_gemma":[0.0003141444,0.000030261463,0.002637479,0.000002946317,0.000013699991,0.0000010579023,0.000003767262,0.97706044,0.011671098,0.00044526072,0.0075673624,0.00025247506],"about_ca_topic_score_codex":0.00012255824,"about_ca_topic_score_gemma":0.000059158716,"teacher_disagreement_score":0.47576347,"about_ca_system_score_codex":0.000123069,"about_ca_system_score_gemma":0.000008342186,"threshold_uncertainty_score":0.7939863},"labels":[],"label_agreement":null},{"id":"W2010133122","doi":"10.1109/greencom.2011.6082506","title":"Dynamic pricing for demand-side management in the smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Electricity; Dynamic pricing; Electricity pricing; Computer science; Environmental economics; Revenue; Grid; Renewable energy; Electricity market; Electricity retailing; Demand response; Reliability (semiconductor); Demand side; Business; Microeconomics; Economics; Engineering; Power (physics); Finance","score_opus":0.015068727897888224,"score_gpt":0.2033111373768668,"score_spread":0.18824240947897858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010133122","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07239841,0.0001293485,0.374806,0.00017289123,0.0014066682,0.0011218234,0.0000017458761,0.0004934391,0.54946965],"genre_scores_gemma":[0.9813146,0.00007057078,0.017018868,0.00029365098,0.000043964803,0.00033548553,0.0000071698223,0.000032966163,0.000882737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930614,0.000012340804,0.00017488819,0.00013864994,0.00010329548,0.00026469323],"domain_scores_gemma":[0.99964845,0.000031695716,0.000011546067,0.00028196274,0.00000617575,0.000020171547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029860495,0.000119038945,0.000091562855,0.00011502522,0.000033341013,0.000017901993,0.00025262716,0.000024635407,0.000044454522],"category_scores_gemma":[0.000003501445,0.00008807059,0.00004307751,0.00015609588,0.000009431021,0.00007259414,0.00004818225,0.00005623955,0.000037087957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006258631,0.0002854487,0.0050761914,0.0010159253,0.00080600166,0.00016175557,0.005334422,0.70205456,0.00025317378,0.1856348,0.060069513,0.039245624],"study_design_scores_gemma":[0.0014609828,0.000082591054,0.17773072,0.00006496272,0.000120923665,0.000007889155,0.0019115271,0.71577156,0.00093234266,0.0044387914,0.09681713,0.0006606077],"about_ca_topic_score_codex":0.00004136004,"about_ca_topic_score_gemma":0.00029598962,"teacher_disagreement_score":0.9089162,"about_ca_system_score_codex":0.000062789986,"about_ca_system_score_gemma":0.0000012614031,"threshold_uncertainty_score":0.35914147},"labels":[],"label_agreement":null},{"id":"W2010322174","doi":"10.1109/tsg.2014.2363098","title":"User-Aware Game Theoretic Approach for Demand Management","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Scalability; Regret; Overhead (engineering); Demand response; Energy consumption; Load management; Game theory; Matching (statistics); Operations research; Mathematical optimization; Distributed computing; Engineering; Microeconomics; Economics","score_opus":0.008396009569244096,"score_gpt":0.19732751168936444,"score_spread":0.18893150212012033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010322174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030088008,0.000020237292,0.97972965,0.00006192041,0.0026527669,0.00061347894,0.000029555136,0.0006802636,0.013203315],"genre_scores_gemma":[0.9884934,0.00010680995,0.008404131,0.00017925617,0.00032811036,0.0008624439,0.000025906307,0.0001120438,0.0014879263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986386,0.000039689618,0.00027865777,0.00036961632,0.00023873757,0.00043470654],"domain_scores_gemma":[0.99917954,0.00008150866,0.000025637302,0.00056758925,0.000028715887,0.000116991745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025985812,0.0003002452,0.00024316202,0.00023653875,0.00013906648,0.00005771151,0.0002654705,0.00009187287,0.000079924364],"category_scores_gemma":[0.0000014271362,0.00030204904,0.00017947519,0.00022474406,0.0000506272,0.0001156943,0.0000024023466,0.00016900865,0.00009514452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029130271,0.000098189164,0.0000083914165,0.00027858058,0.00020316915,0.0000014009292,0.000054635413,0.9862991,0.00005056597,0.002419463,0.0052478327,0.005309571],"study_design_scores_gemma":[0.0015743631,0.00016771311,0.0002827711,0.00005195646,0.00027852735,0.0000066607327,0.00010352678,0.8463537,0.008682618,0.00037698908,0.14147487,0.00064626924],"about_ca_topic_score_codex":0.0000046145738,"about_ca_topic_score_gemma":0.000008347912,"teacher_disagreement_score":0.9854846,"about_ca_system_score_codex":0.00010138054,"about_ca_system_score_gemma":0.0000036777358,"threshold_uncertainty_score":0.99994314},"labels":[],"label_agreement":null},{"id":"W2010721526","doi":"10.2316/journal.203.2010.3.203-4219","title":"ON THE INVISIBLE SOCIO-TECHNICAL SYSTEMS – THE GREAT UNKNOWN","year":2010,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.006693489474506528,"score_gpt":0.20812567197478843,"score_spread":0.2014321825002819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010721526","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7147109,0.004599202,0.025700556,0.009351526,0.10580409,0.0002552847,0.000024286313,0.0002838923,0.13927025],"genre_scores_gemma":[0.9975912,0.00014315337,0.000010602882,0.00016329804,0.0011483164,0.000012918882,0.0000012844781,0.00002162873,0.0009076039],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99880415,0.000054429132,0.00038393599,0.000086656786,0.0005285633,0.0001422486],"domain_scores_gemma":[0.9992215,0.00024243657,0.00011873496,0.00019682426,0.00015756543,0.000062958876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005653453,0.00013601303,0.00015712329,0.00011615657,0.00007055653,0.00022862053,0.00057277124,0.00007689939,0.000037862188],"category_scores_gemma":[0.00004725683,0.00007156867,0.000090601374,0.000068594745,0.00006509264,0.00011207711,0.000060641472,0.00032032165,0.000008499745],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029639992,0.00003489009,0.00036645785,0.00001438246,0.0006361544,0.00007288511,0.00019942179,0.2817865,0.002038137,0.6161269,0.098092735,0.0006019252],"study_design_scores_gemma":[0.00047159992,0.00009341136,0.0014150251,0.00017070535,0.0000359944,0.0008436937,0.00032483903,0.033814922,0.00019419772,0.0006624223,0.96176136,0.00021184674],"about_ca_topic_score_codex":0.00009418342,"about_ca_topic_score_gemma":0.000025144633,"teacher_disagreement_score":0.8636686,"about_ca_system_score_codex":0.00006733062,"about_ca_system_score_gemma":0.000014525805,"threshold_uncertainty_score":0.29184857},"labels":[],"label_agreement":null},{"id":"W2013061330","doi":"10.1109/isgt-asia.2012.6303401","title":"Toward low carbon energy systems: The convergence of wind power, demand response, and the electricity grid","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Wind power; Dispatchable generation; Demand response; Renewable energy; Environmental economics; Distributed generation; Electric power system; Intermittent energy source; Electricity generation; Electricity; Stand-alone power system; Electricity retailing; Pumped-storage hydroelectricity; Fossil fuel; Smart grid; Computer science; Electricity market; Engineering; Power (physics); Electrical engineering; Economics; Waste management","score_opus":0.006502136664824979,"score_gpt":0.17488252502522625,"score_spread":0.16838038836040126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013061330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96696013,0.008425414,0.0062891776,0.0002666238,0.0020275002,0.00022862712,0.000002370889,0.00013639622,0.015663764],"genre_scores_gemma":[0.99887884,0.00042289868,0.000013702419,0.00007093884,0.00014207844,0.00001964138,5.7702675e-7,0.000017665367,0.0004336637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990413,0.00017433212,0.00021646585,0.000099335644,0.00019380139,0.00027476513],"domain_scores_gemma":[0.9992432,0.00032261593,0.00003846844,0.00031782393,0.000025787227,0.000052123996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008845283,0.00013526484,0.00018108683,0.000051925676,0.000042250387,0.00001964535,0.00019758438,0.000046395926,0.000019392177],"category_scores_gemma":[0.00005133012,0.000073985386,0.00003689583,0.00020585101,0.00009516081,0.000069819194,0.00007105439,0.00007765651,0.000002248538],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017468471,0.00014793036,0.02064335,0.000610317,0.0015957892,0.000013584034,0.005511848,0.742865,0.009500549,0.17978013,0.036869936,0.0007146789],"study_design_scores_gemma":[0.0035477264,0.00018680477,0.10036947,0.000120418095,0.00029400174,0.00007818914,0.0017315225,0.709438,0.060283728,0.00021384726,0.122701876,0.0010343839],"about_ca_topic_score_codex":0.00051316415,"about_ca_topic_score_gemma":0.000016971517,"teacher_disagreement_score":0.17956628,"about_ca_system_score_codex":0.000037875594,"about_ca_system_score_gemma":0.000008351685,"threshold_uncertainty_score":0.30170363},"labels":[],"label_agreement":null},{"id":"W2013503339","doi":"10.1109/eem.2010.5558742","title":"Stochastic analysis of a local distribution company voltage profile under uncertain energy supply from a photovoltaic system","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Photovoltaic system; Grid; Voltage; Incentive; Monte Carlo method; Installation; Distributed generation; Environmental economics; Low voltage; Computer science; Automotive engineering; Electrical engineering; Reliability engineering; Engineering; Economics; Microeconomics; Mechanical engineering; Mathematics","score_opus":0.005596221177215109,"score_gpt":0.18924023680031574,"score_spread":0.18364401562310062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013503339","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26857913,0.000025824842,0.7296082,0.00000541037,0.0003722948,0.00008796362,0.00026924137,0.00031905633,0.00073292106],"genre_scores_gemma":[0.99782044,0.0000013228898,0.0004231471,0.00001561324,0.00007792836,0.000081539496,0.0013895578,0.000029641704,0.00016080715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987397,0.000021300308,0.00038139042,0.00027066903,0.00029180286,0.00029508956],"domain_scores_gemma":[0.9991837,0.00009626574,0.00005810085,0.00049086765,0.000064030886,0.00010700919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010798837,0.00022217758,0.00042715538,0.00023258802,0.000039959003,0.000027787148,0.00021594112,0.000111677924,0.00057017966],"category_scores_gemma":[0.0000073721567,0.00020953648,0.0001615163,0.0008968273,0.00006652204,0.000078154844,0.000065772765,0.00013930172,0.000022585966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011454107,0.000036307832,0.00038821026,0.0000385504,0.0012017451,0.0000044169183,0.000026033553,0.95516676,0.027615322,0.0138564855,0.0013372755,0.000317456],"study_design_scores_gemma":[0.00028220424,0.000013181166,0.012452795,0.000019836103,0.00065599364,7.49744e-7,0.00045281023,0.9755444,0.009767448,0.000034357803,0.00055693486,0.00021931014],"about_ca_topic_score_codex":0.0071040937,"about_ca_topic_score_gemma":0.005192354,"teacher_disagreement_score":0.7292413,"about_ca_system_score_codex":0.00020439287,"about_ca_system_score_gemma":0.000017529861,"threshold_uncertainty_score":0.99950767},"labels":[],"label_agreement":null},{"id":"W2014410569","doi":"10.1109/coase.2013.6653961","title":"Managing demand response for manufacturing enterprises via renewable energy integration","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Demand response; Renewable energy; Newsvendor model; Leverage (statistics); Electricity; Business; Revenue; Environmental economics; Load management; Contingency; Peak demand; Industrial organization; Computer science; Economics; Finance; Supply chain; Engineering","score_opus":0.006145024480130285,"score_gpt":0.18813289602131153,"score_spread":0.18198787154118123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2014410569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035522386,0.00006680923,0.9504541,0.00021148767,0.0004752522,0.0001776842,7.0845624e-7,0.0005106004,0.012580959],"genre_scores_gemma":[0.98386097,0.00004931192,0.007732707,0.00018162275,0.00012105239,0.00030438442,0.00001362648,0.000047531612,0.007688803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922997,0.000022084861,0.00019708232,0.00017837169,0.00009736324,0.00027514435],"domain_scores_gemma":[0.999559,0.00009784362,0.000019567142,0.00024186539,0.00002137646,0.000060359158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001483822,0.0001612174,0.000121450124,0.00016927635,0.000063935724,0.0000939187,0.00013629934,0.000044357163,0.0002720218],"category_scores_gemma":[0.00001243425,0.00014975724,0.000055585482,0.00005814492,0.000009868285,0.00030673068,0.000045705143,0.00003608247,0.00004072011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004986095,0.000010587659,0.000033380184,0.000039551564,0.00006664767,0.0000018037168,0.000063435575,0.9194933,0.017809182,0.00018841689,0.04552879,0.016715005],"study_design_scores_gemma":[0.00027843824,0.000032825115,0.00087497797,0.000026997554,0.0000152175535,0.0000021190194,0.00009121728,0.5805774,0.37015626,0.0027165997,0.044997,0.00023099998],"about_ca_topic_score_codex":0.00068598514,"about_ca_topic_score_gemma":0.00023764069,"teacher_disagreement_score":0.94833857,"about_ca_system_score_codex":0.00009927813,"about_ca_system_score_gemma":0.0000028018048,"threshold_uncertainty_score":0.61069226},"labels":[],"label_agreement":null},{"id":"W2016100278","doi":"10.1109/ccece.2010.5575176","title":"Simulation of a house heating system using C# &amp;#x2014; An energy conservation perspective","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Thermostat; Schedule; Energy conservation; Energy consumption; Heating system; Computer science; Occupancy; Simulation; Consumption (sociology); Energy (signal processing); Automotive engineering; Real-time computing; Engineering; Architectural engineering; Electrical engineering; Mechanical engineering; Operating system","score_opus":0.022070273478861997,"score_gpt":0.24741178903529112,"score_spread":0.22534151555642912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016100278","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6166118,0.000007544997,0.3799518,0.0000067193337,0.00032584535,0.000047464036,8.2449037e-7,0.00048101952,0.0025669911],"genre_scores_gemma":[0.98240495,6.736163e-7,0.017327711,0.000018808623,0.00015930746,0.000005568763,0.0000044674016,0.00004322326,0.000035290133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993762,0.00002152856,0.00020685107,0.00013429164,0.00013356785,0.00012757507],"domain_scores_gemma":[0.99947387,0.000066367524,0.00004353565,0.00025284872,0.00012283206,0.00004054937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001295703,0.00010554291,0.00012469097,0.00012047056,0.000043370295,0.000022298009,0.00007047812,0.000060652772,0.0000247995],"category_scores_gemma":[0.00003709363,0.00011092775,0.000029389526,0.00015627885,0.000016816082,0.00022643554,0.000020068295,0.0000654173,0.0000035260964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031661164,0.000010012858,0.0005570615,0.000032635737,0.000024928084,2.6775416e-7,0.00024297537,0.93156344,0.039391086,0.028056694,0.00001518594,0.000102564125],"study_design_scores_gemma":[0.00013955447,0.000010817602,0.0006609843,0.000019211662,0.000016866667,0.0000013574316,0.00062834733,0.99398786,0.0037697542,0.00006441673,0.00058347,0.00011733301],"about_ca_topic_score_codex":0.0026922594,"about_ca_topic_score_gemma":0.0014677146,"teacher_disagreement_score":0.36579314,"about_ca_system_score_codex":0.00012862115,"about_ca_system_score_gemma":0.000010004476,"threshold_uncertainty_score":0.45235023},"labels":[],"label_agreement":null},{"id":"W2016471396","doi":"10.1109/tsg.2015.2394362","title":"Incentive Design for Voltage Optimization Programs for Industrial Loads","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Incentive; Voltage; Investment (military); Monte Carlo method; Rate of return; Control theory (sociology); Time horizon; Sensitivity (control systems); Energy conservation; Return on investment; Mathematical optimization; Constant (computer programming); Electric power system; Reliability engineering; Engineering; Computer science; Power (physics); Economics; Microeconomics; Finance; Production (economics); Electrical engineering; Control (management); Electronic engineering","score_opus":0.08110053526041441,"score_gpt":0.245532083962322,"score_spread":0.1644315487019076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016471396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00065829087,0.00001758149,0.98887354,0.00007049317,0.0076440223,0.0018562739,0.00006963987,0.0005409337,0.00026923],"genre_scores_gemma":[0.83504647,0.000055762455,0.15185733,0.00016271022,0.0027058213,0.007869847,0.0002769031,0.0003326697,0.0016924761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988792,0.000026315209,0.000275803,0.0002641678,0.00019855921,0.00035593708],"domain_scores_gemma":[0.9993416,0.00010672804,0.000037870774,0.000239711,0.00012770663,0.00014637683],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030362207,0.00023005233,0.00020327252,0.00017533303,0.000117432515,0.000068454705,0.00015229899,0.00015419738,0.00001701054],"category_scores_gemma":[0.000012659247,0.0002469556,0.00012899356,0.00027445314,0.000031960542,0.00023202362,0.0000011198255,0.00014284019,0.000018961844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020573782,0.000108593296,0.000005990654,0.00002274726,0.00012383614,7.07677e-7,0.000095929456,0.9677996,0.00006253834,0.00002355361,0.019325394,0.012225349],"study_design_scores_gemma":[0.0030694774,0.0005031869,0.0000030082147,0.000034121244,0.00013156077,0.0000012606356,0.000096652104,0.9059592,0.018057326,0.000061800805,0.07173478,0.0003476081],"about_ca_topic_score_codex":0.000015655192,"about_ca_topic_score_gemma":0.000019687468,"teacher_disagreement_score":0.8370162,"about_ca_system_score_codex":0.0002591794,"about_ca_system_score_gemma":0.00004543534,"threshold_uncertainty_score":0.9999983},"labels":[],"label_agreement":null},{"id":"W2017572490","doi":"10.1109/aina.2014.135","title":"Peak Load Scheduling in Smart Grid Communication Environment","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; University of Alberta","funders":"","keywords":"Smart grid; Computer science; Scheduling (production processes); Limit (mathematics); Power system simulation; Smart meter; Grid; MATLAB; Demand response; Energy consumption; Power (physics); Real-time computing; Embedded system; Electricity; Electrical engineering; Electric power system; Engineering; Operating system","score_opus":0.006126292139452264,"score_gpt":0.17043031482903842,"score_spread":0.16430402268958616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017572490","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5031896,0.00051538454,0.15559675,0.00063449645,0.0006996901,0.00024282617,7.1122673e-7,0.00069356716,0.33842695],"genre_scores_gemma":[0.99043554,0.0001979901,0.008898438,0.00008660495,0.00006165414,0.000027727494,0.0000093061,0.000019748852,0.00026301332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994446,0.000026230045,0.00015258382,0.00009946582,0.00012474757,0.00015235762],"domain_scores_gemma":[0.99949133,0.000029986264,0.000010555909,0.00043276418,0.0000037756438,0.000031610223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000273051,0.00008775112,0.00008311032,0.00005449802,0.000022418977,0.000016281287,0.00016676835,0.00003168964,0.00017169387],"category_scores_gemma":[0.0000110345545,0.00009291091,0.000019722043,0.0000590094,0.000013461318,0.00007691048,0.00008404264,0.00009280957,0.00032375884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.1705e-7,0.000013866295,0.0018643618,0.000011788078,0.000008840827,3.395146e-7,0.00006156404,0.9906306,0.00037470035,0.0033869538,0.00095308037,0.0026929737],"study_design_scores_gemma":[0.00034735719,0.000010617143,0.028535912,0.000021702623,0.000005651862,5.453746e-7,0.00005486059,0.7661815,0.0012354329,0.00025654517,0.20315573,0.00019410363],"about_ca_topic_score_codex":0.000082798135,"about_ca_topic_score_gemma":0.00015028597,"teacher_disagreement_score":0.4872459,"about_ca_system_score_codex":0.00017245847,"about_ca_system_score_gemma":0.0000020620296,"threshold_uncertainty_score":0.4161373},"labels":[],"label_agreement":null},{"id":"W2018826517","doi":"10.1016/j.enpol.2010.01.027","title":"The effect of utility time-varying pricing and load control strategies on residential summer peak electricity use: A review","year":2010,"lang":"en","type":"review","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":387,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"National Research Council Canada; Natural Resources Canada; University of Waterloo","keywords":"Peak demand; Electricity; Demand response; Electricity pricing; Control (management); Load shifting; Environmental economics; Peak load; Mains electricity; Load management; Economics; Supply and demand; Operations management; Microeconomics; Business; Natural resource economics; Electricity market; Automotive engineering; Engineering; Electrical engineering","score_opus":0.013112223618259942,"score_gpt":0.2783764721903536,"score_spread":0.2652642485720937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018826517","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000042975662,0.9925648,0.00022151871,0.000034055494,0.0003122446,0.00055292493,0.000015777003,0.00016648561,0.006089196],"genre_scores_gemma":[0.0016474649,0.99694145,0.000010667736,0.0000601182,0.0006489876,0.00018074774,0.00002234206,0.00010297618,0.00038524673],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972504,0.00054340565,0.000796151,0.000413787,0.0004320513,0.00056419737],"domain_scores_gemma":[0.9973095,0.001356078,0.00029178674,0.0008863015,0.000049789847,0.000106544685],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009966315,0.00065849803,0.0017873881,0.0002497841,0.00015711488,0.00015197694,0.00046010406,0.0002780846,0.000018751558],"category_scores_gemma":[0.0005536431,0.00044020923,0.00040989282,0.00059421716,0.000105467705,0.00015723564,0.00012104773,0.00062933005,0.000014672187],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002213006,0.000011330445,0.0000028976651,0.026622642,0.0006359595,0.000009789251,0.000008181953,0.0014552578,0.000014500306,0.0036864479,0.005178318,0.9623526],"study_design_scores_gemma":[0.00026719234,0.00009097772,0.000024056517,0.009696446,0.0007797353,0.000010709508,3.1508418e-7,0.0009126924,0.00004549978,0.000020836218,0.9877981,0.0003534671],"about_ca_topic_score_codex":0.0013947445,"about_ca_topic_score_gemma":0.0001397437,"teacher_disagreement_score":0.98261976,"about_ca_system_score_codex":0.0002236657,"about_ca_system_score_gemma":0.00020379013,"threshold_uncertainty_score":0.999805},"labels":[],"label_agreement":null},{"id":"W2020721549","doi":"10.1109/tdc.2014.6863413","title":"A review on energy management systems","year":2014,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy management; Smart grid; Computer science; Context (archaeology); Reliability (semiconductor); Work (physics); Energy consumption; Energy storage; Reliability engineering; Load management; Energy management system; Demand response; Efficient energy use; Risk analysis (engineering); Environmental economics; Energy (signal processing); Electricity; Engineering; Business; Electrical engineering","score_opus":0.024728273255336757,"score_gpt":0.2536033129553971,"score_spread":0.22887503970006037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2020721549","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.3434447e-10,0.7190201,0.0040438995,0.000004327327,0.001678148,0.00046203317,0.0000023939813,0.0005940448,0.27419505],"genre_scores_gemma":[5.301222e-8,0.9853133,0.00008610838,0.0003992983,0.00042548444,0.0012070675,0.00009815253,0.00017366426,0.01229688],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981119,0.000097964636,0.0007390457,0.00040857322,0.00027662603,0.00036588163],"domain_scores_gemma":[0.99862176,0.000054670378,0.00009532897,0.0011165563,0.000012077241,0.000099594545],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00026992036,0.0006399836,0.0019697354,0.0002864303,0.000024662675,0.000049412432,0.00052675896,0.00014653848,0.00013704349],"category_scores_gemma":[0.000003999663,0.0004865448,0.00044230794,0.00035018608,0.000008906757,0.000026576716,0.00012301099,0.00016359857,0.001470325],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.3475502e-8,0.0000040449736,1.0984326e-9,0.2428605,0.00026633948,0.000008465257,1.0089757e-7,0.0017492685,1.5140524e-10,0.023055503,0.2592981,0.47275764],"study_design_scores_gemma":[0.000033383978,0.000010440338,1.0744039e-8,0.17875469,0.00073284924,0.0000064390324,3.2822894e-7,0.00057227124,1.1683095e-8,0.0000027742237,0.81948185,0.00040492672],"about_ca_topic_score_codex":0.000010262672,"about_ca_topic_score_gemma":0.000001947979,"teacher_disagreement_score":0.56018376,"about_ca_system_score_codex":0.00026066726,"about_ca_system_score_gemma":0.000005738871,"threshold_uncertainty_score":0.9997586},"labels":[],"label_agreement":null},{"id":"W2021871536","doi":"10.1016/j.renene.2012.10.013","title":"Integrating renewable energy using a smart distribution system: Potential of self-regulating demand response","year":2012,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Smart grid; Wind power; Automotive engineering; Demand response; Distributed generation; Grid; Engineering; Electrical engineering; Electricity","score_opus":0.0074591040309815535,"score_gpt":0.19440882252413563,"score_spread":0.1869497184931541,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021871536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2239156,0.00158976,0.7676986,0.000006891367,0.0019009634,0.00007502559,0.000020463463,0.0007279731,0.004064703],"genre_scores_gemma":[0.9911365,0.00005656517,0.0070070326,0.000015788304,0.00082795013,0.00004261007,0.00011945252,0.000114293274,0.0006797973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99706405,0.0003173817,0.00077893864,0.0003073872,0.0005071475,0.0010250891],"domain_scores_gemma":[0.9986781,0.0001381097,0.00022991456,0.0005786478,0.00010332629,0.0002719012],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001136394,0.0004315443,0.00052133354,0.00026325893,0.00022286653,0.000068079855,0.0002819622,0.0002294447,0.000027479839],"category_scores_gemma":[0.00008354805,0.00045379685,0.0001793303,0.0006899775,0.000040697065,0.00058783556,0.000196798,0.00009574765,0.0000022790698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006879536,0.000059069112,0.00096421485,0.00017407445,0.0001990229,0.000004582446,0.00008097813,0.9215816,0.07354011,0.001291948,0.0019169732,0.000118593445],"study_design_scores_gemma":[0.00046331683,0.00004123997,0.00046692323,0.00030062933,0.00016188908,0.00005396637,0.00040506452,0.8117081,0.1673161,0.000027179887,0.01857725,0.00047834136],"about_ca_topic_score_codex":0.018274523,"about_ca_topic_score_gemma":0.0003850175,"teacher_disagreement_score":0.7672209,"about_ca_system_score_codex":0.00084359996,"about_ca_system_score_gemma":0.000057702087,"threshold_uncertainty_score":0.9997914},"labels":[],"label_agreement":null},{"id":"W2022898263","doi":"10.1109/tsg.2013.2294055","title":"Optimal Distribution Systems Operation Using Smart Matching Scheme (SMS) for Smart Grid Applications","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Dispatchable generation; Renewable energy; Computer science; Context (archaeology); Matching (statistics); Grid; Reliability engineering; Distributed generation; Electric power system; Distributed computing; Engineering; Power (physics); Electrical engineering","score_opus":0.015133679642777393,"score_gpt":0.22860924353792117,"score_spread":0.21347556389514377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022898263","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041924115,0.00006373687,0.9476153,0.00007825828,0.00751724,0.0012142039,0.00037993403,0.00079078425,0.00041641213],"genre_scores_gemma":[0.9814222,0.000056289682,0.013564465,0.00008048985,0.0019506875,0.0020196629,0.0005218568,0.00015946681,0.00022488943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977899,0.000078800695,0.0006276801,0.00048270967,0.00037180874,0.00064908306],"domain_scores_gemma":[0.9988056,0.00014800258,0.000086399465,0.0006336032,0.000116032475,0.00021037683],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005556201,0.0004361197,0.000383463,0.00023503393,0.0006479739,0.00021371598,0.00026296315,0.00019790509,0.000029367136],"category_scores_gemma":[0.000007010604,0.0004930744,0.00022052697,0.00038101556,0.000050437116,0.00056251226,0.0000048049387,0.00032823207,0.00012878816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002485633,0.00010794538,0.000042898788,0.000172257,0.00013688016,3.981556e-7,0.000059019774,0.99154437,0.004176149,0.0008152995,0.0020578152,0.00086211227],"study_design_scores_gemma":[0.0007608147,0.000083223335,0.0001788888,0.00008906829,0.00015865613,0.000018483339,0.00011084089,0.84910524,0.011194851,0.000016651316,0.1376833,0.0005999838],"about_ca_topic_score_codex":0.00017004837,"about_ca_topic_score_gemma":0.000052641506,"teacher_disagreement_score":0.93949807,"about_ca_system_score_codex":0.00051714154,"about_ca_system_score_gemma":0.000029988601,"threshold_uncertainty_score":0.9997521},"labels":[],"label_agreement":null},{"id":"W2022979892","doi":"10.1109/tste.2014.2319239","title":"Energy Provisioning and Operating Costs in Hybrid Solar-Powered Infrastructure","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Operating expense; Provisioning; Solar power; Computer science; Operating cost; Grid parity; Solar energy; Capital cost; Grid; Scheduling (production processes); Reliability engineering; Photovoltaic system; Automotive engineering; Electrical engineering; Power (physics); Engineering; Photovoltaics; Computer network; Operations management","score_opus":0.0024211013398553766,"score_gpt":0.17493618356518043,"score_spread":0.17251508222532505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022979892","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03899119,0.000113250855,0.95167863,0.00006856142,0.00047676367,0.00009824524,0.0000031576112,0.00034207775,0.008228102],"genre_scores_gemma":[0.9961975,0.00014118246,0.00068674405,0.00022391885,0.000079915306,0.00012733442,0.0000064149626,0.000081752245,0.002455241],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984127,0.00006698065,0.00032027307,0.00037542044,0.00021206429,0.0006125585],"domain_scores_gemma":[0.9993558,0.00008263067,0.000031003172,0.00033661543,0.00006259315,0.00013135931],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017846847,0.00031278672,0.0002799724,0.000461077,0.00022675369,0.00013793189,0.00016839888,0.00010672308,0.00006830003],"category_scores_gemma":[0.00001002068,0.00033293592,0.00005047644,0.0003954509,0.00004093674,0.00035592992,0.000007055563,0.000249081,0.0000020773562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012512864,0.000026194613,0.000014825562,0.000055041924,0.00003934525,0.000040729312,0.000077942816,0.9541786,0.00049336016,0.004418358,0.00039864567,0.04024449],"study_design_scores_gemma":[0.0012610683,0.0001582735,0.00017139786,0.000057833735,0.000046173398,0.000027995538,0.0010543807,0.87677807,0.043315027,0.00086742843,0.075576894,0.00068546715],"about_ca_topic_score_codex":0.000995693,"about_ca_topic_score_gemma":0.00030650749,"teacher_disagreement_score":0.9572063,"about_ca_system_score_codex":0.0004734707,"about_ca_system_score_gemma":0.00003599173,"threshold_uncertainty_score":0.99991226},"labels":[],"label_agreement":null},{"id":"W2023682492","doi":"10.1109/ccece.2014.6900912","title":"Grid connected energy storage system to profit from net-metering and variable rate electricity","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Net metering; Electricity; Energy storage; Sizing; Stand-alone power system; Computer science; Metering mode; Profit (economics); Grid; Variable (mathematics); Automotive engineering; Energy consumption; Environmental economics; Distributed generation; Electrical engineering; Renewable energy; Engineering; Economics; Microeconomics; Mathematics","score_opus":0.0042557109874709394,"score_gpt":0.15567533101969996,"score_spread":0.15141962003222903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023682492","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48461682,0.000059871094,0.49625766,0.000025409297,0.0009704464,0.00012772808,0.0000058322025,0.0010965894,0.016839638],"genre_scores_gemma":[0.99385357,0.000009967254,0.005081608,0.00014689553,0.00036574865,0.00006194684,0.000018521323,0.00004866977,0.00041308673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901384,0.000059371883,0.00020476682,0.00028227465,0.000109466,0.0003302922],"domain_scores_gemma":[0.9994126,0.00010207787,0.00002085866,0.00030099208,0.000026722842,0.00013675848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002064,0.00019576993,0.00023855006,0.00012148704,0.00005432542,0.00008321547,0.00014005415,0.000060474733,0.000050017425],"category_scores_gemma":[0.000029973888,0.0001932323,0.000019568603,0.00023565184,0.000004979916,0.000101553735,0.000095332216,0.000068201574,0.000029844974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015818732,0.000007874653,0.000556489,0.00014213874,0.00018870793,0.000009896053,0.000063818814,0.8992105,0.056192655,0.034971546,0.0067223567,0.0019181743],"study_design_scores_gemma":[0.0003813341,0.00005034671,0.0035544175,0.00005462694,0.000031537336,0.000002265021,0.000024132965,0.9387145,0.015665246,0.00006827211,0.0410823,0.0003710174],"about_ca_topic_score_codex":0.0016187662,"about_ca_topic_score_gemma":0.00014263121,"teacher_disagreement_score":0.50923675,"about_ca_system_score_codex":0.00012189471,"about_ca_system_score_gemma":0.000004634006,"threshold_uncertainty_score":0.78797853},"labels":[],"label_agreement":null},{"id":"W2023865237","doi":"10.1109/tsg.2014.2302245","title":"Game-Theoretic Demand-Side Management With Storage Devices for the Future Smart Grid","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":235,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Stackelberg competition; Smart grid; Nash equilibrium; Computer science; Game theory; Energy storage; Mathematical optimization; Schedule; Profit (economics); Energy consumption; Uniqueness; Energy management; Demand response; Operations research; Mathematical economics; Energy (signal processing); Electricity; Microeconomics; Economics; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.005398316040496996,"score_gpt":0.1888385152619778,"score_spread":0.1834401992214808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023865237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011552665,0.00021411004,0.9722295,0.00072871684,0.008668281,0.0009881662,0.00004873654,0.00071521004,0.0048546125],"genre_scores_gemma":[0.99262196,0.00045356547,0.0024654423,0.0006376109,0.0015713215,0.0011058924,0.000022754917,0.00016479267,0.0009566735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99812436,0.00006888845,0.00035003343,0.00045996165,0.00041418822,0.00058257056],"domain_scores_gemma":[0.9986197,0.00025703863,0.000058949954,0.0008685682,0.00005498893,0.00014076591],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043961033,0.0004603064,0.00031877815,0.0002313431,0.00037024045,0.00011967254,0.00046951833,0.0001073865,0.00009938859],"category_scores_gemma":[0.0000015025638,0.00033554924,0.00020177891,0.00037613904,0.00010640873,0.00019262632,0.000004548245,0.00032783547,0.00012238731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115413466,0.00008169739,0.000044385168,0.00033063022,0.0006137721,0.000008779261,0.0001481323,0.9755339,0.0000353942,0.0016304385,0.006939584,0.014517854],"study_design_scores_gemma":[0.0021282448,0.00039027623,0.0038386534,0.0001872116,0.0008928702,0.000026576197,0.0004966257,0.15698923,0.0036699474,0.00021265086,0.83022934,0.00093838683],"about_ca_topic_score_codex":0.00001858867,"about_ca_topic_score_gemma":0.00063280895,"teacher_disagreement_score":0.98106927,"about_ca_system_score_codex":0.00013827685,"about_ca_system_score_gemma":0.000010488316,"threshold_uncertainty_score":0.99990964},"labels":[],"label_agreement":null},{"id":"W2024220340","doi":"10.1109/ccece.2014.6901160","title":"Design and implementation of a rule-based learning algorithm using Zigbee wireless sensors for energy management","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; Wireless; Wireless sensor network; Computer science; Energy consumption; Electricity; Energy management; Microcontroller; Energy conservation; Energy (signal processing); Embedded system; Efficient energy use; Real-time computing; Algorithm; Engineering; Computer network; Telecommunications; Electrical engineering","score_opus":0.010647139666911292,"score_gpt":0.2265532376148892,"score_spread":0.2159060979479779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024220340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07101609,0.000014757941,0.92817503,0.000012195894,0.00011351128,0.0002018138,0.000001122124,0.00014540594,0.00032009097],"genre_scores_gemma":[0.6307866,0.000020218162,0.36890298,0.000032618405,0.00004675124,0.00006502195,0.00001544866,0.000043122935,0.00008724688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923915,0.000038973638,0.00021755414,0.00016459808,0.00012613734,0.00021358376],"domain_scores_gemma":[0.99970144,0.00007118667,0.00004369423,0.00011703126,0.000027358778,0.000039303446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025602343,0.00013774732,0.00015256854,0.00015768103,0.0000545313,0.000022930928,0.00005996267,0.000030547446,0.000022162245],"category_scores_gemma":[0.0000018544955,0.00014708316,0.00003318357,0.000103845494,0.000014489007,0.00006407989,0.000028450073,0.000028670986,6.0098085e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005273024,0.000006325896,0.00009024552,0.0001225667,0.00007799244,6.9608916e-7,0.00003269293,0.87255406,0.0017282469,0.0023854254,0.00013318445,0.122863285],"study_design_scores_gemma":[0.000855385,0.00005011363,0.00032462942,0.000018344384,0.000054463984,5.8544157e-7,0.00015221276,0.9598004,0.035182618,0.00009038164,0.0033131326,0.00015772934],"about_ca_topic_score_codex":0.00008318179,"about_ca_topic_score_gemma":0.00000645269,"teacher_disagreement_score":0.55977046,"about_ca_system_score_codex":0.000051684852,"about_ca_system_score_gemma":0.000003808943,"threshold_uncertainty_score":0.5997877},"labels":[],"label_agreement":null},{"id":"W2026118018","doi":"10.1109/tetc.2013.2273457","title":"A Game-Theoretical Scheme in the Smart Grid With Demand-Side Management: Towards a Smart Cyber-Physical Power Infrastructure","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Emerging Topics in Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":117,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Stackelberg competition; Smart grid; Electricity; Procurement; Demand response; Profit (economics); Computer science; Grid; Electricity retailing; Game theory; Electricity market; Environmental economics; Business; Microeconomics; Economics; Marketing","score_opus":0.005219531272848779,"score_gpt":0.21408164285604017,"score_spread":0.2088621115831914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026118018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6358133,0.000015351048,0.3512248,0.00059369294,0.0009122566,0.0004191248,0.0000015761976,0.00023147186,0.010788407],"genre_scores_gemma":[0.9936295,0.000017296914,0.005733227,0.00026904873,0.00016984787,0.0000860958,0.0000024861458,0.000049801998,0.00004265328],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998249,0.00008950249,0.00036328912,0.00036330815,0.00038967753,0.00054524717],"domain_scores_gemma":[0.99930924,0.00010401094,0.000033622604,0.00046217212,0.000026879816,0.00006406536],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002714628,0.00032071985,0.00027296605,0.0003211769,0.00010890956,0.00010114686,0.00039988602,0.000085840875,0.00007389363],"category_scores_gemma":[0.0000037820216,0.00026037125,0.00009052942,0.00069168594,0.00010677658,0.0001508048,0.000011639469,0.0007498679,0.000025581287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011776672,0.000109008775,0.00062062615,0.000086364045,0.000098632656,0.00005105301,0.0020051782,0.9708763,0.000027657656,0.0076738587,0.00019982223,0.01823974],"study_design_scores_gemma":[0.0012551411,0.00010364682,0.030528888,0.00036781305,0.000051615432,0.000027043496,0.0008852676,0.95955604,0.00056980224,0.0028014358,0.0032317752,0.0006215144],"about_ca_topic_score_codex":0.00007584338,"about_ca_topic_score_gemma":0.00006824423,"teacher_disagreement_score":0.35781625,"about_ca_system_score_codex":0.00016560631,"about_ca_system_score_gemma":0.000011641001,"threshold_uncertainty_score":0.99998486},"labels":[],"label_agreement":null},{"id":"W2026208021","doi":"10.1109/ccece.2012.6334885","title":"Parameter identification of thermal models for domestic electric water heaters in a direct load control program","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Resources Canada","keywords":"Water heater; Thermal; Electric heating; Identification (biology); Temperature control; Water consumption; Power (physics); Water heating; Control (management); Computer science; Electric power; Heating element; Temperature measurement; Environmental science; Automotive engineering; Control engineering; Engineering; Mechanical engineering; Environmental engineering; Meteorology","score_opus":0.010391782445087205,"score_gpt":0.22454325743840362,"score_spread":0.2141514749933164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026208021","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90188015,0.00015290428,0.09446886,0.000034130946,0.000281337,0.00092138594,0.0000016054827,0.00023383065,0.0020258196],"genre_scores_gemma":[0.99825454,0.0000059432514,0.0007945821,0.00001897127,0.000039872488,0.0007366648,0.0000060787283,0.000023828981,0.00011951367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919236,0.000016699374,0.00024858417,0.00009698726,0.00010268463,0.0003426774],"domain_scores_gemma":[0.9997201,0.00004888009,0.000015028902,0.00015947723,0.000022949334,0.00003354545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029517722,0.00010048559,0.00014646337,0.00011262181,0.000009324488,0.000015183391,0.00007600553,0.000036888276,0.000011234289],"category_scores_gemma":[0.000010829267,0.000074005155,0.00004869411,0.00010215827,0.0000082000115,0.0001979649,0.00000858293,0.00003406857,0.000009918496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031650365,0.00011157481,0.0010308445,0.00008722534,0.00008261657,3.2243216e-7,0.00022478955,0.9412002,0.049639363,0.000261813,0.0001301767,0.007199427],"study_design_scores_gemma":[0.000665433,0.000038019858,0.0045417654,0.0000060106427,0.00003473765,4.8995105e-7,0.000006800386,0.92212206,0.07203666,0.00011793738,0.0003033753,0.00012673408],"about_ca_topic_score_codex":0.000028663924,"about_ca_topic_score_gemma":0.000005045166,"teacher_disagreement_score":0.09637442,"about_ca_system_score_codex":0.00008673724,"about_ca_system_score_gemma":0.0000030335298,"threshold_uncertainty_score":0.30178425},"labels":[],"label_agreement":null},{"id":"W2028400261","doi":"10.1109/icsai.2014.7009284","title":"Implementation of a virtual power plant: The integrated load management system","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Siemens (Canada)","funders":"","keywords":"Virtual power plant; Siemens; Load management; Demand response; Computer science; Distributed generation; Energy management; Management system; Power management; Electricity generation; Systems engineering; Embedded system; Energy management system; Electric power system; Power (physics); Operating system; Energy (signal processing); Engineering; Electrical engineering; Renewable energy; Electricity; Operations management","score_opus":0.003727049590816393,"score_gpt":0.184953268756461,"score_spread":0.1812262191656446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028400261","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28101045,0.000049925955,0.34164912,0.00015813524,0.0020408337,0.0007306512,0.00002066779,0.001090141,0.37325007],"genre_scores_gemma":[0.9991198,0.000006968506,0.0003850628,0.000043275893,0.00002891983,0.000038377926,0.000012397841,0.00001677002,0.0003484072],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999299,0.000026287933,0.00021796742,0.00009783937,0.00021182494,0.00014708073],"domain_scores_gemma":[0.99965,0.000023429156,0.000026616655,0.0002549083,0.000022785987,0.000022266586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025466617,0.00010535904,0.000100455654,0.00005981564,0.000027104043,0.000018128801,0.00016631998,0.000019675095,0.00016491162],"category_scores_gemma":[0.0000015907316,0.00007079412,0.000033277596,0.00014193439,0.000013081485,0.000047313028,0.00005017165,0.00004208043,0.000060272458],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018652356,0.000026393462,0.0007647138,0.000302552,0.0006641174,0.0000064518795,0.00086092943,0.16043821,0.0008773341,0.74831605,0.06440672,0.023317855],"study_design_scores_gemma":[0.0024051205,0.00027490212,0.029869683,0.00018238621,0.00020607296,0.000010368988,0.03828237,0.30643666,0.016526537,0.00007490097,0.6050443,0.0006866954],"about_ca_topic_score_codex":0.00013570487,"about_ca_topic_score_gemma":0.00016020917,"teacher_disagreement_score":0.7482412,"about_ca_system_score_codex":0.00012010566,"about_ca_system_score_gemma":0.000003240249,"threshold_uncertainty_score":0.28869006},"labels":[],"label_agreement":null},{"id":"W2028464759","doi":"10.1016/j.apenergy.2012.10.054","title":"Hierarchical market integration of responsive loads as spinning reserve","year":2012,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Virtual power plant; Flexibility (engineering); Market integration; Electric power system; Demand response; Spinning; Grid; Vertical integration; Population; Distributed generation; Environmental economics; Power (physics); Electricity; Industrial organization; Engineering; Business; Economics; Renewable energy; Microeconomics; Mechanical engineering; Electrical engineering","score_opus":0.010571747694277626,"score_gpt":0.2194636593016767,"score_spread":0.20889191160739906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028464759","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.320941,0.00043666738,0.05363027,0.00010710883,0.00092410244,0.000117273026,0.0000033759522,0.00042124966,0.623419],"genre_scores_gemma":[0.99613017,0.000046719924,0.0024321342,0.000092330556,0.00032000308,0.00007032583,0.000023972854,0.00004490751,0.00083946117],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99900204,0.000034068198,0.00025752766,0.00014177636,0.00022598398,0.00033861253],"domain_scores_gemma":[0.99940443,0.0000944072,0.00003798328,0.00033599575,0.000024694938,0.000102488506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022819269,0.00016360261,0.00018267157,0.00018292414,0.000032479435,0.000012424493,0.00017182942,0.00009551242,0.00020386423],"category_scores_gemma":[0.000036172947,0.00016466355,0.000049787337,0.00027837287,0.000043526543,0.00010721464,0.000093079856,0.00012698116,0.00003944673],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026901267,0.00009955214,0.0002036416,0.00006700037,0.00021775327,0.0000071437426,0.00076075667,0.11914361,0.07053457,0.74245864,0.0323965,0.033841837],"study_design_scores_gemma":[0.0012695318,0.00015928863,0.011462512,0.00011358061,0.00009348629,0.000013115641,0.0009511175,0.051005814,0.4754423,0.0061195143,0.45230573,0.0010640259],"about_ca_topic_score_codex":0.00008835139,"about_ca_topic_score_gemma":0.000023195606,"teacher_disagreement_score":0.7363391,"about_ca_system_score_codex":0.00007688506,"about_ca_system_score_gemma":0.000009745332,"threshold_uncertainty_score":0.6714785},"labels":[],"label_agreement":null},{"id":"W2028725268","doi":"10.1109/tsg.2013.2289922","title":"Peak Load Curtailment in a Smart Grid Via Fuzzy System Approach","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Load management; Demand response; Load balancing (electrical power); Fuzzy logic; Computer science; Electric power system; Grid; Load profile; Energy management; Duty cycle; Peak demand; Reliability engineering; Fuzzy control system; Energy consumption; Power (physics); Base load power plant; Energy (signal processing); Engineering; Electricity; Voltage; Electrical engineering; Mathematics","score_opus":0.008354657079227008,"score_gpt":0.1840282279579185,"score_spread":0.1756735708786915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028725268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026878582,0.00008721858,0.9108356,0.00010700247,0.011820809,0.0007120733,0.00003692101,0.0014044978,0.048117295],"genre_scores_gemma":[0.99656284,0.00004967226,0.0014269111,0.00010470307,0.0006552207,0.00059963064,0.00002098006,0.00012794293,0.0004521285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99727684,0.000130214,0.0006451288,0.0006014356,0.00062499684,0.0007213569],"domain_scores_gemma":[0.99870384,0.000082028404,0.00005460094,0.0008838213,0.000055353954,0.00022035776],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057777885,0.0005090146,0.0005001806,0.00047577673,0.00016231365,0.00007536838,0.00038901536,0.00018583307,0.000059488044],"category_scores_gemma":[0.0000036682559,0.00053984206,0.00022421035,0.00063349603,0.00005373005,0.0002400283,0.0000052946707,0.00054393103,0.0005910324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004240955,0.00025790263,0.00013243729,0.00036158776,0.00015591636,0.000013644457,0.00025052566,0.9893515,0.0005762485,0.00028728257,0.0043388256,0.0042317254],"study_design_scores_gemma":[0.00346245,0.00031731674,0.003405988,0.0003673148,0.0002406368,0.000081558755,0.0004579286,0.82979983,0.009883219,0.000047471403,0.15018164,0.0017546498],"about_ca_topic_score_codex":0.0003782531,"about_ca_topic_score_gemma":0.0005023891,"teacher_disagreement_score":0.96968424,"about_ca_system_score_codex":0.00094998407,"about_ca_system_score_gemma":0.000029896815,"threshold_uncertainty_score":0.9997053},"labels":[],"label_agreement":null},{"id":"W2029996148","doi":"10.1109/sege.2013.6707914","title":"A survey on cost saving methods for smart grids","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Computer science; Profit (economics); Grid; Power grid; Environmental economics; Power (physics); Engineering; Economics","score_opus":0.03872871043532773,"score_gpt":0.3023298301063073,"score_spread":0.2636011196709796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029996148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015282151,0.000046019613,0.92000204,0.00012416088,0.0017679133,0.0006996826,0.000005984359,0.00067907874,0.061392985],"genre_scores_gemma":[0.688707,0.000036748752,0.296865,0.0009536155,0.00043492473,0.001379403,0.000107971064,0.00018345755,0.011331899],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993216,0.000050230294,0.00014929334,0.00014859698,0.00006759153,0.00026273637],"domain_scores_gemma":[0.99922335,0.00040504735,0.000010193355,0.00025931912,0.00003619228,0.00006587969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053716084,0.00012923194,0.00013397109,0.000077018776,0.00003521278,0.00005316931,0.00013247337,0.000042597814,0.00039967653],"category_scores_gemma":[0.000104028564,0.000116614014,0.000046174137,0.00012044329,0.000008569054,0.00008603039,0.00003547583,0.000060363982,0.00024671998],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008957835,0.000042460553,0.005038639,0.00007930654,0.00019905658,7.005836e-7,0.00005389592,0.22169885,0.002265035,0.004874632,0.51869404,0.24704443],"study_design_scores_gemma":[0.00042542824,0.00005962307,0.31437033,0.000016044432,0.000013055439,3.608421e-7,0.0000203933,0.4565215,0.005390783,0.0002939357,0.22252065,0.00036789282],"about_ca_topic_score_codex":0.00051554776,"about_ca_topic_score_gemma":0.00024787438,"teacher_disagreement_score":0.67342484,"about_ca_system_score_codex":0.000068464076,"about_ca_system_score_gemma":0.0000031784057,"threshold_uncertainty_score":0.47553816},"labels":[],"label_agreement":null},{"id":"W2030343799","doi":"10.1109/tsg.2011.2177103","title":"A Water-Filling Based Scheduling Algorithm for the Smart Grid","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Scheduling (production processes); Smart grid; Grid; Distributed computing; Computation; Demand response; Power consumption; Fair-share scheduling; Real-time computing; Electricity; Mathematical optimization; Computer network; Power (physics); Algorithm; Engineering; Quality of service","score_opus":0.018780063193263707,"score_gpt":0.22064305393423642,"score_spread":0.20186299074097272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030343799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006361203,0.00018155332,0.97320557,0.00035886117,0.01815072,0.00056626945,0.000090013404,0.000703097,0.0003826993],"genre_scores_gemma":[0.9559812,0.00013332302,0.038042393,0.0005638408,0.003322384,0.0012506607,0.000053511023,0.00022909607,0.00042358873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998075,0.00004026245,0.00038473055,0.00029065966,0.000322242,0.000887092],"domain_scores_gemma":[0.99884105,0.0002990622,0.000029718401,0.00058557955,0.000058174875,0.00018643837],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005573164,0.0003755234,0.00026460024,0.00022793286,0.000505457,0.00008450027,0.00030402272,0.00012748914,0.0001996564],"category_scores_gemma":[0.000004087069,0.000279029,0.00029705817,0.00025479033,0.000053606975,0.00031051977,0.0000028744714,0.00037352412,0.00024703506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018059338,0.00010706592,0.000022301088,0.000053635875,0.00022483103,0.0000014917905,0.00015446075,0.971227,0.0013017822,0.000014510618,0.0016529537,0.02522194],"study_design_scores_gemma":[0.0006972034,0.00005203136,0.00008756781,0.000038440845,0.0001794744,0.0000058462706,0.00008565082,0.7283362,0.12609161,0.0000065819863,0.14402747,0.0003919114],"about_ca_topic_score_codex":0.0000513438,"about_ca_topic_score_gemma":0.000034227334,"teacher_disagreement_score":0.94962,"about_ca_system_score_codex":0.00017120942,"about_ca_system_score_gemma":0.00001540207,"threshold_uncertainty_score":0.9999662},"labels":[],"label_agreement":null},{"id":"W2030568301","doi":"10.1109/tdc.2012.6281718","title":"Demand response in the New Zealand Electricity market","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Incentive; Demand management; Deferral; Load management; Electricity market; Business; Demand reduction; Peak demand; Smart meter; Economics; Electricity; Environmental economics; Industrial organization; Microeconomics; Finance; Engineering","score_opus":0.007080765292675246,"score_gpt":0.19923941449476412,"score_spread":0.1921586492020889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030568301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8807916,0.00038992552,0.009411069,0.0010936707,0.00037691655,0.00016082941,3.4380489e-7,0.00021929432,0.10755635],"genre_scores_gemma":[0.9913138,0.000033532844,0.00026822885,0.00023980808,0.00015930198,0.000009039046,5.7766556e-7,0.000010956564,0.007964739],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99943334,0.000075563,0.00008658876,0.00005222713,0.000097363125,0.0002549368],"domain_scores_gemma":[0.9996287,0.00014505604,0.0000051426123,0.00017421019,0.0000023609691,0.00004448137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007809476,0.00007156632,0.000058552763,0.00007002756,0.000013765849,0.000016717295,0.00011990094,0.000026447447,0.00026419314],"category_scores_gemma":[0.000033564236,0.000049050028,0.00001688446,0.00021615856,0.000004205516,0.00008699315,0.0000169353,0.00007537822,0.000049921815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011062855,0.000022151722,0.019991592,0.0000053878207,0.000019361696,0.0000042231172,0.00042271128,0.021192115,0.0002941719,0.0005165757,0.9566351,0.0007859511],"study_design_scores_gemma":[0.00026545124,0.000016977187,0.5746651,0.0000029772777,0.000006881648,0.000005018244,0.000032102518,0.011153768,0.00069773314,0.000085809545,0.41295645,0.00011166929],"about_ca_topic_score_codex":0.000056161247,"about_ca_topic_score_gemma":0.000051160834,"teacher_disagreement_score":0.55467355,"about_ca_system_score_codex":0.0000393818,"about_ca_system_score_gemma":0.000004369049,"threshold_uncertainty_score":0.28927293},"labels":[],"label_agreement":null},{"id":"W2030592030","doi":"10.1109/epec.2013.6802971","title":"Optimizing wireless performance of current metering and consumption control in commercial buildings","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algonquin College","funders":"","keywords":"Metering mode; Transformer; Electrical engineering; Wireless; Current transformer; Engineering; Automotive engineering; Electronic circuit; AC power; Computer science; Telecommunications; Voltage; Mechanical engineering","score_opus":0.014385384522551751,"score_gpt":0.21383081156425676,"score_spread":0.199445427041705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030592030","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9812516,0.00020911054,0.017678073,0.000014741912,0.00021730857,0.0001404771,4.546794e-7,0.00007083842,0.00041739384],"genre_scores_gemma":[0.99810773,0.00032900096,0.0014702772,0.0000151317345,0.0000231873,0.00003716999,9.011749e-7,0.000011790183,0.000004788496],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950963,0.000008242188,0.00018338441,0.00008432779,0.00006882288,0.00014557007],"domain_scores_gemma":[0.99982923,0.0000286322,0.000019087187,0.000081192054,0.000012955659,0.000028881606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008506389,0.00008770411,0.00014272936,0.00010342967,0.000014140921,0.000017164844,0.00005834269,0.000022307642,0.00004683204],"category_scores_gemma":[0.0000024588048,0.000087756416,0.000013859308,0.000054655553,0.000021954922,0.00019530483,0.00003463753,0.000071105715,0.0000075335906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014588989,0.000039941686,0.23788974,0.00069004146,0.000064495405,9.208639e-7,0.00045509465,0.5865519,0.04084637,0.0021146166,0.00043659087,0.1308957],"study_design_scores_gemma":[0.0007101742,0.000016480528,0.11889119,0.00009125339,0.00000873955,8.117726e-7,0.000019023639,0.87419295,0.005432296,0.000004494228,0.00049765914,0.00013493715],"about_ca_topic_score_codex":0.000053379154,"about_ca_topic_score_gemma":0.000014072202,"teacher_disagreement_score":0.28764105,"about_ca_system_score_codex":0.00003288027,"about_ca_system_score_gemma":0.0000013591432,"threshold_uncertainty_score":0.3578603},"labels":[],"label_agreement":null},{"id":"W2031385568","doi":"10.1109/acssc.2013.6810593","title":"Real-time energy storage management with renewable energy of arbitrary generation dynamics","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Renewable energy; Energy storage; Energy management; Relaxation (psychology); Optimization problem; Online algorithm; Optimal control; Energy (signal processing); Control (management); Control theory (sociology); Algorithm; Lyapunov equation; Lyapunov exponent; Mathematics; Engineering; Power (physics); Electrical engineering","score_opus":0.003923115883117833,"score_gpt":0.15337480888757332,"score_spread":0.1494516930044555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031385568","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033767376,0.000055481356,0.37886062,0.00006126694,0.00028827024,0.00014191003,0.000003933577,0.00060396077,0.58621716],"genre_scores_gemma":[0.90212154,0.0007136979,0.036636204,0.00015479744,0.00024665627,0.00025951338,0.00029967484,0.00014451264,0.059423417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988921,0.000021663216,0.0002868711,0.00024347375,0.0002627857,0.00029309597],"domain_scores_gemma":[0.9993234,0.000012685842,0.00004649504,0.00048895675,0.000046034504,0.00008239261],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000061017956,0.00022820361,0.00021337859,0.00020170113,0.00003708019,0.000040862953,0.00019111915,0.000064047665,0.0006812842],"category_scores_gemma":[7.5486923e-7,0.0002052727,0.000044342425,0.00027785668,0.00002725919,0.00026337255,0.000070604365,0.000036038793,0.000029899451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004253982,0.000037041696,0.00003660734,0.00004659034,0.00020850463,0.00001098672,0.000011933155,0.8970637,0.0053265295,0.04339167,0.051539753,0.0023224538],"study_design_scores_gemma":[0.00030310376,0.000059396196,0.00038113157,0.000019244513,0.000038015645,0.0000024245355,0.000042654414,0.979211,0.012638091,0.00041251787,0.006595744,0.00029669955],"about_ca_topic_score_codex":0.0060203853,"about_ca_topic_score_gemma":0.0013889999,"teacher_disagreement_score":0.86835414,"about_ca_system_score_codex":0.00016544365,"about_ca_system_score_gemma":0.000007914664,"threshold_uncertainty_score":0.9101062},"labels":[],"label_agreement":null},{"id":"W2034853345","doi":"10.1109/isgteurope.2010.5638892","title":"Wireless network performance for residential demand-side participation","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Latency (audio); Computer science; Network packet; Computer network; Wireless network; Wireless; Wireless sensor network; Energy consumption; Real-time computing; Telecommunications; Engineering","score_opus":0.008718947740970037,"score_gpt":0.21758416540521736,"score_spread":0.20886521766424732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034853345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8897036,0.000009676723,0.09582751,0.000054711058,0.0021664326,0.00015901422,4.9031365e-7,0.0003479386,0.011730677],"genre_scores_gemma":[0.9947435,0.0000148431,0.0033454043,0.000046970163,0.00095233123,0.0001408097,0.000009622855,0.000025799854,0.00072068814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993965,0.000004338908,0.00014814636,0.000103866325,0.00008707855,0.00026004933],"domain_scores_gemma":[0.9997089,0.00003101991,0.0000133324065,0.00018057069,0.00002100549,0.000045160883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001617488,0.000086789434,0.000080459045,0.000029246241,0.00006749086,0.000031066204,0.0000934259,0.000047583588,0.000085042164],"category_scores_gemma":[0.000008078737,0.00008551212,0.000030213694,0.00007993239,0.000012021987,0.00013458883,0.00002271043,0.00007590562,0.000043580065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010534919,0.000007119817,0.00327557,0.00004912009,0.000030885956,5.0713174e-7,0.000026250695,0.9517701,0.0024215595,0.0064401664,0.029701991,0.0062661665],"study_design_scores_gemma":[0.00026737503,0.000019279772,0.04789733,0.000007662851,0.000021668342,6.069932e-7,0.0000037749521,0.90838104,0.01525416,0.00021253954,0.02777822,0.00015630854],"about_ca_topic_score_codex":0.000008388126,"about_ca_topic_score_gemma":0.00035717152,"teacher_disagreement_score":0.105039984,"about_ca_system_score_codex":0.000013134292,"about_ca_system_score_gemma":0.0000040241125,"threshold_uncertainty_score":0.34870827},"labels":[],"label_agreement":null},{"id":"W2036145503","doi":"10.1109/ccece.2013.6567686","title":"The cognitive power meter: Looking beyond the smart meter","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University; British Columbia Institute of Technology","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart meter; Automatic meter reading; Metre; Electricity meter; Computer science; Smart grid; Key (lock); Electrical engineering; Power (physics); Real-time computing; Telecommunications; Engineering; Computer security; Wireless","score_opus":0.004397420001912264,"score_gpt":0.17647056317112314,"score_spread":0.17207314316921088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036145503","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17993452,0.0005525404,0.018039735,0.0021534548,0.002507825,0.0006545555,0.000002216089,0.0006116518,0.7955435],"genre_scores_gemma":[0.9931231,0.000036590776,0.00024288705,0.0011183225,0.000100481375,0.00016616994,0.0000022751285,0.00003777023,0.0051724026],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99916434,0.000034798726,0.00016209477,0.00013378175,0.00018745601,0.00031750317],"domain_scores_gemma":[0.9992583,0.0003219268,0.000016845102,0.00031563177,0.000044489116,0.000042845546],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00021461128,0.00015273025,0.000093079034,0.00003510866,0.00016579882,0.00018835312,0.00026223826,0.00003330548,0.0010179301],"category_scores_gemma":[0.000028701877,0.00007709077,0.00007126461,0.00011983512,0.000057905036,0.00015864267,0.00012040744,0.00013333067,0.000992155],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002057702,0.00006879268,0.0031682304,0.00004541661,0.0032308614,0.000021475738,0.0024440663,0.021822618,0.0034165725,0.037563678,0.8390432,0.08915454],"study_design_scores_gemma":[0.0014584142,0.00014617057,0.050793096,0.0000618934,0.0003421708,0.00001964769,0.0053927964,0.10364077,0.035232022,0.0063762493,0.7950579,0.0014788707],"about_ca_topic_score_codex":0.0000669081,"about_ca_topic_score_gemma":0.00006560542,"teacher_disagreement_score":0.8131886,"about_ca_system_score_codex":0.000030673305,"about_ca_system_score_gemma":0.0000028699624,"threshold_uncertainty_score":0.9998953},"labels":[],"label_agreement":null},{"id":"W2038217105","doi":"10.1109/jec-ecc.2012.6186973","title":"Supply and load management for the smart distribution grid using wireless networks","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Scalability; Computer science; Load balancing (electrical power); Wireless; Grid; Load management; Energy management; Resilience (materials science); Distributed computing; Computer network; Telecommunications; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.010975546486525876,"score_gpt":0.20272365521662963,"score_spread":0.19174810873010376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038217105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039296504,0.0008842481,0.955437,0.00009809543,0.0018579504,0.00036395597,0.000008461056,0.00017987618,0.0018738938],"genre_scores_gemma":[0.9975395,0.00025116216,0.0011817398,0.000060791677,0.00056944136,0.00007997531,0.000037838865,0.000023839088,0.00025568032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934846,0.000009105201,0.00011578894,0.00009388566,0.00010253419,0.00033025356],"domain_scores_gemma":[0.9996943,0.000046826586,0.000012541434,0.00018011381,0.000013915834,0.000052320767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029138674,0.000115900766,0.000079912235,0.000015823229,0.00010609085,0.000041930656,0.00008376748,0.00003257237,0.000021826201],"category_scores_gemma":[0.000002082773,0.00008705908,0.00003164261,0.00008651318,0.000020540378,0.00012808898,0.000075500735,0.000047772708,0.0000039473593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011138854,0.000027685886,0.006357554,0.00012657397,0.00035260472,0.0000011020165,0.00006515175,0.88028145,0.000053150023,0.024507698,0.049493264,0.038722616],"study_design_scores_gemma":[0.00024753768,0.000005817721,0.01924257,0.000012562591,0.00010274942,0.0000023156124,0.000076634606,0.8055929,0.00018105636,0.000018320323,0.1743697,0.00014782444],"about_ca_topic_score_codex":0.000031615975,"about_ca_topic_score_gemma":0.000017617345,"teacher_disagreement_score":0.958243,"about_ca_system_score_codex":0.0001213962,"about_ca_system_score_gemma":0.0000013800027,"threshold_uncertainty_score":0.35501665},"labels":[],"label_agreement":null},{"id":"W2039408570","doi":"10.1109/smartgridcomm.2014.7007628","title":"An analysis of energy storage and regulation","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Operator (biology); Unit (ring theory); Service (business); Computer science; Range (aeronautics); Power (physics); State (computer science); Balance (ability); Energy storage; Variable (mathematics); Operations research; Reliability engineering; Mathematical optimization; Control theory (sociology); Economics; Control (management); Engineering; Mathematics; Physics","score_opus":0.0038596464833832345,"score_gpt":0.17709336714363283,"score_spread":0.17323372066024958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039408570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4814819,0.000011942208,0.5038833,0.0000060621937,0.000045400946,0.000006892939,3.328848e-7,0.00008979618,0.014474372],"genre_scores_gemma":[0.9987472,0.000006727834,0.0009796057,0.000014970826,0.00002326191,0.0000014665966,0.000012416644,0.0000058924666,0.00020841292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997586,0.000009773109,0.000071175855,0.000060470567,0.000053306743,0.00004667913],"domain_scores_gemma":[0.9997947,0.000009827788,0.000008569601,0.00015634533,0.000008157237,0.000022406806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006204982,0.0000384669,0.00008093145,0.00016121939,0.000007065284,0.000006165236,0.00003130626,0.000016053331,0.000078541125],"category_scores_gemma":[0.0000018992774,0.000037180434,0.000016429416,0.00019632497,0.000006572641,0.000055917117,0.000007493188,0.000007834424,4.9457185e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.828195e-7,0.0000031121535,0.0019756104,0.000003771615,0.000112891765,4.823049e-8,0.000012327957,0.96684164,0.0012836873,0.027056592,0.00014295615,0.0025668964],"study_design_scores_gemma":[0.000035515444,0.000008212069,0.13131167,5.7867175e-7,0.00008714939,2.9367172e-8,0.000005719456,0.8635645,0.0013793184,0.000055932825,0.003513144,0.00003826877],"about_ca_topic_score_codex":0.00007093139,"about_ca_topic_score_gemma":0.00019214697,"teacher_disagreement_score":0.5172653,"about_ca_system_score_codex":0.0000076002952,"about_ca_system_score_gemma":4.1736527e-7,"threshold_uncertainty_score":0.15161741},"labels":[],"label_agreement":null},{"id":"W2039532980","doi":"10.1109/smartgridcomm.2014.7007632","title":"Real-time energy storage management: Finite-time horizon approach","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Time horizon; Optimization problem; Control (management); Renewable energy; Optimal control; Energy management; Dynamic programming; Control theory (sociology); Energy (signal processing); Engineering; Algorithm; Lyapunov equation; Mathematics","score_opus":0.0044288162935944885,"score_gpt":0.16216006935556646,"score_spread":0.15773125306197197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039532980","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026280375,0.000017812834,0.201568,0.000023061133,0.00029589992,0.00009264538,0.0000018352192,0.0015123005,0.79386044],"genre_scores_gemma":[0.717252,0.00047515595,0.055836607,0.00026100667,0.0013065923,0.0002860698,0.00034664944,0.00041055595,0.22382532],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985746,0.000047018595,0.00026016412,0.00036140866,0.00028750437,0.00046927686],"domain_scores_gemma":[0.99907875,0.000057087076,0.000027348633,0.0006946199,0.000016553311,0.00012566612],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002350088,0.00029904692,0.00026105755,0.00024058693,0.00006364747,0.00006748783,0.00036761453,0.000090820104,0.0007850228],"category_scores_gemma":[0.000007217647,0.00030096673,0.00008586515,0.0003236454,0.000025295909,0.00015333654,0.00016158095,0.00008164215,0.0013425372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066303987,0.000056314046,0.000008773868,0.00009988188,0.00021684142,0.0000113925735,0.000026983858,0.8283292,0.0011135952,0.0632337,0.09389266,0.013003988],"study_design_scores_gemma":[0.00034080987,0.000048111546,0.00017811434,0.0000098456785,0.000039936236,0.000001202405,0.000013094546,0.7743861,0.00051313604,0.00025593952,0.22383174,0.00038197753],"about_ca_topic_score_codex":0.00005032189,"about_ca_topic_score_gemma":0.0000023508633,"teacher_disagreement_score":0.714624,"about_ca_system_score_codex":0.00009734592,"about_ca_system_score_gemma":0.0000021925973,"threshold_uncertainty_score":0.99994427},"labels":[],"label_agreement":null},{"id":"W2039856804","doi":"10.1109/tsg.2012.2212032","title":"Optimal Operation of Residential Energy Hubs in Smart Grids","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":494,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Linear programming; Mathematical optimization; Stove; Energy consumption; Electricity; Mathematical model; Demand response; Integer programming; Smart grid; Energy management; Energy storage; Energy (signal processing); Simulation; Engineering; Power (physics); Mathematics","score_opus":0.010843966917627222,"score_gpt":0.21099518582657284,"score_spread":0.2001512189089456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039856804","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3120865,0.00014464563,0.6741979,0.000077610515,0.008999713,0.00017185112,0.000029665776,0.0002838593,0.0040082526],"genre_scores_gemma":[0.99765205,0.00014952023,0.0011709026,0.00004763794,0.00043952675,0.00010552547,0.000015145162,0.000055882458,0.0003638067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985704,0.00005973535,0.00044526107,0.00020181072,0.0002971061,0.00042572067],"domain_scores_gemma":[0.99941915,0.00004721948,0.00003275635,0.00035888125,0.000029248937,0.0001127627],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002376886,0.00023155102,0.0002491538,0.00043071268,0.00006928452,0.000024161985,0.00016806295,0.0001210743,0.00029328113],"category_scores_gemma":[0.000002453252,0.00025867473,0.00011651656,0.00036818767,0.00004209265,0.00045878714,0.0000026413702,0.00020829363,0.00007197891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004016086,0.00016599896,0.0003446126,0.000031564316,0.00007276627,0.0000033257843,0.00019125543,0.99033356,0.0045162854,0.0002130669,0.0024469357,0.0016404972],"study_design_scores_gemma":[0.002524236,0.0002819459,0.018693686,0.00014171963,0.00018233767,0.000027344779,0.00024835084,0.1883581,0.7279591,0.000021592125,0.06040489,0.0011567106],"about_ca_topic_score_codex":0.00041572776,"about_ca_topic_score_gemma":0.00063917344,"teacher_disagreement_score":0.8019754,"about_ca_system_score_codex":0.00015108334,"about_ca_system_score_gemma":0.00001723367,"threshold_uncertainty_score":0.9999865},"labels":[],"label_agreement":null},{"id":"W2041493998","doi":"10.1145/2465529.2465744","title":"Firming solar power","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Solar irradiance; Solar power; Computer science; Revenue; Power (physics); Electricity generation; Reliability (semiconductor); Environmental science; Reliability engineering; Meteorology; Engineering; Business; Finance; Physics","score_opus":0.003495756771021482,"score_gpt":0.15110082988917262,"score_spread":0.14760507311815113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041493998","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26028726,0.00006528487,0.03732782,0.00020244007,0.00091081124,0.00010704399,1.592437e-7,0.001016133,0.7000831],"genre_scores_gemma":[0.99434185,0.000005255081,0.002162883,0.00014290506,0.00004716718,0.000020910218,7.139698e-7,0.000016444676,0.0032618544],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996937,0.0000019784334,0.000060791765,0.000055775054,0.00005529088,0.00013244804],"domain_scores_gemma":[0.9998175,0.0000069109356,0.0000025989673,0.0001339487,0.0000073095334,0.00003174766],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00002221567,0.00005541321,0.000041549967,0.000030025529,0.000013579306,0.000025231962,0.000065265274,0.000017741086,0.003775653],"category_scores_gemma":[0.0000028774039,0.000050384126,0.000017072389,0.000048348276,0.000004021818,0.000113113296,0.000025457279,0.000033296546,0.0023305644],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.7334993e-7,0.000016851493,0.0018266042,0.000030648516,0.000097380966,0.0000074542613,0.00017847757,0.25733966,0.005241653,0.00670309,0.7157831,0.012774696],"study_design_scores_gemma":[0.00022550338,0.000017500648,0.032350417,0.000010677326,0.000007662759,0.000002580374,0.00015589304,0.25026003,0.010394969,0.00050778536,0.70566404,0.00040295607],"about_ca_topic_score_codex":0.000031902757,"about_ca_topic_score_gemma":0.0000038486464,"teacher_disagreement_score":0.7340546,"about_ca_system_score_codex":0.000017261655,"about_ca_system_score_gemma":7.227231e-7,"threshold_uncertainty_score":0.9984462},"labels":[],"label_agreement":null},{"id":"W2041818989","doi":"10.1109/tsg.2013.2284760","title":"A Novel Current Sensor for Home Energy Use Monitoring","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electrical conductor; Electrical engineering; Current sensor; Electronic engineering; Conductor; Wireless sensor network; Tracking (education); Calibration; Power (physics); Engineering; Energy (signal processing); Magnetic field; Current (fluid); Computer science; Real-time computing; Materials science; Physics","score_opus":0.027601887702382175,"score_gpt":0.227784334507067,"score_spread":0.20018244680468483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041818989","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022732588,0.00004029023,0.95922744,0.000047427926,0.016874084,0.00016513575,0.00006877628,0.0006587588,0.00018552529],"genre_scores_gemma":[0.9903483,0.00019411417,0.0067391945,0.00005106185,0.0015554752,0.0004457937,0.000011606699,0.00013233209,0.0005221139],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987303,0.000018828505,0.00028367864,0.00031469282,0.00022546778,0.00042703585],"domain_scores_gemma":[0.99914783,0.00018901363,0.000028241662,0.00044096613,0.0000534738,0.0001404772],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011469535,0.00028704875,0.00023428531,0.00025484854,0.0001537238,0.00007835901,0.0001640821,0.000080372934,0.000018526393],"category_scores_gemma":[0.000005152792,0.00031082376,0.00018507685,0.00021727759,0.00002461225,0.00023136525,0.0000016196126,0.0001822028,0.000042242675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002809208,0.00012558968,0.000049196362,0.000070843744,0.0001167939,7.417678e-7,0.000043405562,0.9626308,0.005847806,0.00020628634,0.0018739091,0.029006515],"study_design_scores_gemma":[0.0016928045,0.00015641145,0.0012741538,0.00012638676,0.00014861069,0.000009381398,0.000025212063,0.2965136,0.09755727,0.000039788047,0.6016253,0.00083106285],"about_ca_topic_score_codex":0.000059060658,"about_ca_topic_score_gemma":0.000044045693,"teacher_disagreement_score":0.9676157,"about_ca_system_score_codex":0.00014139252,"about_ca_system_score_gemma":0.000008361936,"threshold_uncertainty_score":0.9999344},"labels":[],"label_agreement":null},{"id":"W2042101093","doi":"10.1109/jsac.2014.2332112","title":"Direct Electricity Trading in Smart Grid: A Coalitional Game Analysis","year":2014,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":200,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Alexander von Humboldt-Stiftung","keywords":"Shapley value; Electricity; Computer science; Smart grid; Revenue; Electricity pricing; Electricity market; Electricity retailing; Dynamic pricing; Electricity generation; Game theory; Mathematical optimization; Grid; Microeconomics; Environmental economics; Power (physics); Business; Economics; Finance; Mathematics; Electrical engineering","score_opus":0.019832332288050432,"score_gpt":0.2504470573568902,"score_spread":0.2306147250688398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042101093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90714943,0.00058437424,0.031981386,0.0014127978,0.00081029825,0.0003186909,0.000024570018,0.00047951745,0.05723896],"genre_scores_gemma":[0.9977817,0.0006702839,0.0010991617,0.00012847625,0.00014804787,0.000050311683,0.00005098428,0.000029976905,0.000041052255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998113,0.00046640588,0.0005824754,0.00016571207,0.000299544,0.00037290537],"domain_scores_gemma":[0.99822223,0.0006720658,0.0000977136,0.0007924741,0.00010445775,0.00011104981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082058413,0.00019305015,0.00035398043,0.0015726312,0.00013385489,0.00008518088,0.0007775043,0.00008342588,0.000055015604],"category_scores_gemma":[0.00019992342,0.00020931498,0.00012177543,0.0039278003,0.000037098744,0.00016684768,0.00003650231,0.00089359866,0.000017772765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021799466,0.00034639123,0.036695417,0.00000975814,0.0005514389,0.000008346291,0.0002604979,0.95412475,0.0009161991,0.0019129749,0.0038381326,0.001314269],"study_design_scores_gemma":[0.0006317541,0.00004975882,0.2489217,0.0000817269,0.00013054258,0.000021415926,0.000016793625,0.7337556,0.0005541972,0.0005239446,0.015005442,0.0003071374],"about_ca_topic_score_codex":0.0000767244,"about_ca_topic_score_gemma":0.0021347078,"teacher_disagreement_score":0.22036919,"about_ca_system_score_codex":0.00062517176,"about_ca_system_score_gemma":0.00003984581,"threshold_uncertainty_score":0.8535617},"labels":[],"label_agreement":null},{"id":"W2043125187","doi":"10.1109/epec.2013.6802939","title":"Microgrid level competitive market using dynamic matching","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Microgrid; Incentive; Matching (statistics); Industrial organization; Tariff; Market penetration; Business; Computer science; Microeconomics; Control (management); Economics; Marketing; International trade","score_opus":0.012129932843337733,"score_gpt":0.20218134115671732,"score_spread":0.19005140831337958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043125187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6478789,0.00019639134,0.15456142,0.0001295193,0.0012196779,0.00029946514,0.0000085597985,0.00090212136,0.19480397],"genre_scores_gemma":[0.95892096,0.00004371677,0.038697615,0.00015049295,0.00007763675,0.000021044,0.00000786824,0.00005547055,0.00202519],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993198,0.000013659319,0.00015195175,0.00013936883,0.000102834696,0.0002723698],"domain_scores_gemma":[0.9996941,0.000028348959,0.000013392816,0.00018707656,0.000022148299,0.000054950575],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000065098015,0.00014809922,0.00012128679,0.00008737098,0.00004433051,0.000069690715,0.00013159179,0.000036037018,0.002280926],"category_scores_gemma":[0.0000026651267,0.00014793246,0.00004137063,0.00010197792,0.000017909888,0.00019288453,0.00007751781,0.00008834289,0.00035220967],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004975241,0.00005980666,0.0013089059,0.00023151301,0.00046730158,0.000029546574,0.00038690818,0.8401598,0.07964954,0.00770388,0.049034514,0.020963311],"study_design_scores_gemma":[0.00025490895,0.000007365955,0.025700925,0.00004651981,0.000018734221,0.000012573474,0.00050486624,0.9562102,0.0017833428,0.00044940898,0.014609083,0.00040209157],"about_ca_topic_score_codex":0.00030913763,"about_ca_topic_score_gemma":0.00008413637,"teacher_disagreement_score":0.3110421,"about_ca_system_score_codex":0.00013477617,"about_ca_system_score_gemma":0.000003989149,"threshold_uncertainty_score":0.9986311},"labels":[],"label_agreement":null},{"id":"W2045362395","doi":"10.1109/tsg.2012.2203341","title":"Advanced Demand Side Management for the Future Smart Grid Using Mechanism Design","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":815,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Demand response; Smart meter; Energy consumption; Electricity; Payment; Load management; Dynamic pricing; Economics; Microeconomics; Engineering","score_opus":0.020968726258033914,"score_gpt":0.22838121257083024,"score_spread":0.20741248631279632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045362395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031983766,0.00046150776,0.9715377,0.00022207701,0.022232927,0.0012524568,0.00004290022,0.0005087473,0.0005432797],"genre_scores_gemma":[0.92930204,0.0011746743,0.06285933,0.0005235605,0.0035195919,0.0015564188,0.000016267584,0.00027452176,0.00077357754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980985,0.00007550181,0.00037192777,0.00032932247,0.0003438296,0.0007809243],"domain_scores_gemma":[0.99887794,0.00019986744,0.00005305109,0.0006571256,0.000041569423,0.00017043273],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005864238,0.000423484,0.00027771425,0.00022624519,0.0005142375,0.00006557139,0.0003276863,0.0001244521,0.000082455284],"category_scores_gemma":[0.0000018010713,0.0003608583,0.00023359821,0.00034829704,0.000036438574,0.00039041825,0.0000051844545,0.00027818384,0.00007914619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057804686,0.000090859685,0.000004761764,0.0000986909,0.000459388,0.000003854188,0.00013023685,0.9808496,0.0015732562,0.00058058486,0.0030339542,0.0131170135],"study_design_scores_gemma":[0.0032275554,0.00024659844,0.00072558125,0.00016482342,0.0015136907,0.000053917658,0.0011210828,0.46893245,0.15828794,0.00047335168,0.36355898,0.0016940424],"about_ca_topic_score_codex":0.000010790013,"about_ca_topic_score_gemma":0.00004011554,"teacher_disagreement_score":0.9261037,"about_ca_system_score_codex":0.00024764257,"about_ca_system_score_gemma":0.000010833433,"threshold_uncertainty_score":0.99988437},"labels":[],"label_agreement":null},{"id":"W2045593775","doi":"10.1080/10485230309509643","title":"End-user Electric Demand Management Should be a National Policy Objective","year":2003,"lang":"en","type":"article","venue":"Strategic Planning for Energy and the Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Legislation; Energy policy; Pace; Energy management; Energy supply; Business; Economics; Politics; Energy (signal processing); Public economics; Environmental economics; Political science; Engineering","score_opus":0.017496655740558538,"score_gpt":0.21949840352308464,"score_spread":0.2020017477825261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045593775","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06697724,0.0046688933,0.17309886,0.0010004048,0.00074868655,0.0010493349,0.000037889993,0.00039894975,0.75201976],"genre_scores_gemma":[0.99619246,0.00045595877,0.00083899713,0.00029789502,0.000111380934,0.0003370478,0.000025049205,0.000031745032,0.0017094939],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989625,0.00004983513,0.00017692815,0.00023259615,0.00024723125,0.00033090796],"domain_scores_gemma":[0.9996483,0.00010378416,0.00003416714,0.00014998144,0.0000051700817,0.00005862555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033277404,0.00021380666,0.00015646062,0.00013078634,0.00017532676,0.00004166627,0.00011662837,0.00006037406,0.000027599612],"category_scores_gemma":[0.000006260699,0.00016745545,0.00006187827,0.00011675464,0.00006834613,0.0000586592,0.00003112408,0.00008032935,0.0000025803524],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019607089,0.000014567226,0.000012794771,0.000011978473,0.00018159757,0.0000025959155,0.00006229064,0.4188244,0.00004882282,0.58030295,0.00040631706,0.00011205725],"study_design_scores_gemma":[0.0072557786,0.000234278,0.0020383124,0.000053461852,0.00028155537,0.000041039235,0.0010557773,0.08801426,0.0054089585,0.39317656,0.50132674,0.0011132756],"about_ca_topic_score_codex":0.000016409494,"about_ca_topic_score_gemma":0.0000035317823,"teacher_disagreement_score":0.9292152,"about_ca_system_score_codex":0.0001580403,"about_ca_system_score_gemma":0.000013117698,"threshold_uncertainty_score":0.6828635},"labels":[],"label_agreement":null},{"id":"W2045976629","doi":"10.1109/wcsp.2011.6096965","title":"Energy efficient communication networks design for demand response in smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Smart grid; Computer science; Demand response; Computer network; Wireless; Distributed computing; Telecommunications network; Network packet; Energy consumption; Communications system; Power control; Packet loss; Power (physics); Telecommunications; Engineering; Electricity; Electrical engineering","score_opus":0.02725963643846009,"score_gpt":0.20278419172887088,"score_spread":0.17552455529041078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045976629","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024048973,0.00027228688,0.96961015,0.000029782743,0.00033403552,0.00017687125,5.0039193e-7,0.00020967396,0.0053177346],"genre_scores_gemma":[0.9797232,0.000088122215,0.019596897,0.00007787735,0.00003693667,0.00021269021,0.000008140001,0.00003065618,0.00022545675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992954,0.00010512721,0.00019685447,0.00011745077,0.0000613494,0.00022382785],"domain_scores_gemma":[0.9993189,0.00021752474,0.000016539916,0.00038909138,0.000017745213,0.000040217896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007154861,0.00010890142,0.00010590289,0.00012303413,0.000036322148,0.000012747143,0.00019885527,0.000056966157,0.000043505926],"category_scores_gemma":[0.000018069846,0.000109061875,0.0000312276,0.00015441408,0.000016886981,0.00004134891,0.000051873852,0.00005212053,0.000006032049],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023363945,0.000028099033,0.00008515991,0.000005059816,0.000016741347,0.000001248022,0.000121896985,0.990943,0.000055567,0.0026335344,0.0054024276,0.00047362456],"study_design_scores_gemma":[0.00037549392,0.00004787791,0.0048187384,0.000014413264,0.000007693738,6.740777e-7,0.000030885498,0.9841677,0.0019332992,0.00012099233,0.00834577,0.00013646984],"about_ca_topic_score_codex":0.00007206157,"about_ca_topic_score_gemma":0.000091261994,"teacher_disagreement_score":0.95567423,"about_ca_system_score_codex":0.000080149155,"about_ca_system_score_gemma":0.000005288698,"threshold_uncertainty_score":0.44474143},"labels":[],"label_agreement":null},{"id":"W2048156068","doi":"10.1109/pesgm.2014.6938942","title":"Multi-objective pricing game among interconnected smart microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Renewable energy; Computer science; Plug-in; Context (archaeology); Game theory; Wind power; Production (economics); Electric power system; Distributed computing; Power (physics); Engineering; Microeconomics; Economics; Electrical engineering","score_opus":0.006217499468941525,"score_gpt":0.18701781186532498,"score_spread":0.18080031239638347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048156068","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68413734,0.000028988343,0.2825893,0.000024511157,0.0009766788,0.00015253789,6.334317e-7,0.001289153,0.030800873],"genre_scores_gemma":[0.9914031,0.000008311718,0.0072357208,0.000103874525,0.00015344836,0.000033740205,0.0000067192273,0.000055414235,0.0009996671],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999106,0.00003117251,0.00020737085,0.00022868255,0.00010249638,0.00032426356],"domain_scores_gemma":[0.9995034,0.00006198015,0.000020000543,0.00030182904,0.000034235858,0.00007859952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015285498,0.0001950303,0.00017935803,0.00015455962,0.00003120455,0.000047093094,0.00017530721,0.00006435136,0.00014047709],"category_scores_gemma":[0.000050490642,0.00018812675,0.0000628492,0.00021183983,0.000032857806,0.00014847798,0.00008970658,0.00014262577,0.00018171004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000247361,0.00023975107,0.087000445,0.00029814694,0.0010159485,0.00002878728,0.003315653,0.7696551,0.08003013,0.0028630649,0.020973325,0.034554902],"study_design_scores_gemma":[0.0006814958,0.000041271218,0.18945193,0.000046385845,0.00002716491,0.0000027907345,0.0002059151,0.76475525,0.027767466,0.000028480654,0.016575687,0.000416144],"about_ca_topic_score_codex":0.00018072125,"about_ca_topic_score_gemma":0.00041651513,"teacher_disagreement_score":0.30726576,"about_ca_system_score_codex":0.00011096958,"about_ca_system_score_gemma":0.0000027461429,"threshold_uncertainty_score":0.7671586},"labels":[],"label_agreement":null},{"id":"W2048470735","doi":"10.1109/smartgridcomm.2011.6102349","title":"Optimal energy consumption scheduling using mechanism design for the future smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Computer science; Payment; Incentive; Mechanism design; Incentive compatibility; Energy consumption; Demand response; Electricity; Electricity pricing; End user; Operations research; Microeconomics; Electricity market; Economics","score_opus":0.05442491240263533,"score_gpt":0.22106240486121706,"score_spread":0.16663749245858173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048470735","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009515963,0.00033650082,0.9860737,0.00002756028,0.0027680874,0.00018474527,0.0000017113671,0.0003580657,0.00073368207],"genre_scores_gemma":[0.43911886,0.00026779462,0.5588391,0.0001689344,0.001218946,0.00013665007,0.0000070523065,0.00007988484,0.00016278947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992772,0.000018566563,0.00016299778,0.00016008042,0.00010599712,0.00027520963],"domain_scores_gemma":[0.9995961,0.00005957784,0.000023327459,0.00024583776,0.000029072677,0.00004603666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022448781,0.00016309111,0.00010943308,0.00006658905,0.00013337539,0.00003337036,0.00018050542,0.00007513564,0.00025273825],"category_scores_gemma":[0.0000048975994,0.00012496834,0.0000656754,0.00007639901,0.000016790258,0.00012598219,0.000044109736,0.00006683654,0.000013755882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001627332,0.000009317859,0.0000151189515,0.000021321779,0.00012210582,0.000001910841,0.00008661265,0.93989694,0.0019970355,0.055632643,0.0009137794,0.0012869404],"study_design_scores_gemma":[0.00023204535,0.000022569373,0.000081742226,0.000009224435,0.00006564381,0.000005457264,0.00014390776,0.9577495,0.03476462,0.0004031097,0.0063346494,0.0001875687],"about_ca_topic_score_codex":0.00003907556,"about_ca_topic_score_gemma":0.000019614516,"teacher_disagreement_score":0.42960292,"about_ca_system_score_codex":0.000058944155,"about_ca_system_score_gemma":0.000008037175,"threshold_uncertainty_score":0.50960606},"labels":[],"label_agreement":null},{"id":"W2049010637","doi":"10.1109/tsg.2014.2372674","title":"Smart Distribution System Operations With Price-Responsive and Controllable Loads","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Ontario Power Authority","keywords":"Controllability; Load management; Demand response; Smart grid; Load profile; Scheduling (production processes); Load regulation; Minification; Computer science; Mathematical optimization; Engineering; Electrical engineering; Electricity; Voltage; Mathematics","score_opus":0.0042611609479103925,"score_gpt":0.17002828145077756,"score_spread":0.16576712050286715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049010637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.084855415,0.000040356772,0.90924656,0.00020915973,0.0017823005,0.00039491992,0.00011261411,0.00065948017,0.0026991628],"genre_scores_gemma":[0.9983028,0.000033599794,0.00055804406,0.00007737425,0.00017225851,0.0002544192,0.000035036697,0.000048882743,0.00051757385],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987722,0.00007685775,0.0002615481,0.00029994376,0.00025699893,0.0003324196],"domain_scores_gemma":[0.99924535,0.00011060294,0.000022922455,0.00038208583,0.00009038957,0.00014865663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002320427,0.00026554457,0.0002682562,0.00013938999,0.00030865538,0.000116469644,0.00011539049,0.00008823416,0.000035630143],"category_scores_gemma":[0.000005402349,0.00024168726,0.00005601269,0.00030505325,0.000060824856,0.00022957343,0.0000017655855,0.0002052683,0.000107402724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095325886,0.00004561611,0.000047772723,0.00007765279,0.00016716712,0.000005430756,0.00006233115,0.9948534,0.001020877,0.00085758127,0.001872265,0.0008945823],"study_design_scores_gemma":[0.0031621882,0.0005268745,0.0021835042,0.00020013862,0.00030076486,0.000073700765,0.0002704558,0.8619055,0.026090935,0.000007842063,0.10448377,0.00079428765],"about_ca_topic_score_codex":0.000093718445,"about_ca_topic_score_gemma":0.0003040595,"teacher_disagreement_score":0.9134474,"about_ca_system_score_codex":0.00021684136,"about_ca_system_score_gemma":0.00002146269,"threshold_uncertainty_score":0.98557204},"labels":[],"label_agreement":null},{"id":"W2050007090","doi":"10.1109/smartgridcomm.2012.6485967","title":"Demand response through a temperature setpoint market in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Setpoint; Thermostat; Setback; Demand response; Incentive; Population; Air conditioning; Environmental science; Economics; Computer science; Electrical engineering; Engineering; Electricity; Microeconomics; Demography","score_opus":0.008866205010178036,"score_gpt":0.19061652950899896,"score_spread":0.18175032449882092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050007090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8734956,0.00015573799,0.00053010165,0.0001444477,0.0006308595,0.00010408237,6.3112697e-7,0.00020260637,0.12473595],"genre_scores_gemma":[0.9838296,0.000012144875,0.0023813068,0.0002355246,0.00007849012,0.00002869488,0.000002968961,0.000024452165,0.013406824],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9992778,0.000045016604,0.00014335821,0.00010140739,0.00010504863,0.00032738387],"domain_scores_gemma":[0.99965054,0.00004787869,0.00000679912,0.00023402295,0.000005931229,0.00005480951],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003991947,0.00013066932,0.00011517969,0.00006746766,0.000017768114,0.000021562655,0.0000853639,0.00006998464,0.001622744],"category_scores_gemma":[0.000015524492,0.00011765858,0.000029751398,0.00012712492,0.000008765043,0.00025550096,0.000046227233,0.00018052623,0.000084673884],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006151414,0.00018641184,0.17258161,0.00008738365,0.0001919294,0.00008223807,0.008127971,0.18037142,0.00729751,0.0030321118,0.6272399,0.00018636735],"study_design_scores_gemma":[0.00044725116,0.000015717344,0.6609387,0.00002348547,0.000008177786,0.000008773131,0.00013887693,0.00138602,0.0027378383,0.00006601166,0.3339748,0.0002543558],"about_ca_topic_score_codex":0.0028499279,"about_ca_topic_score_gemma":0.0453784,"teacher_disagreement_score":0.4883571,"about_ca_system_score_codex":0.00032282548,"about_ca_system_score_gemma":0.00001295564,"threshold_uncertainty_score":0.99928993},"labels":[],"label_agreement":null},{"id":"W2050071282","doi":"10.1109/tsg.2014.2373271","title":"Optimal Operation of Industrial Energy Hubs in Smart Grids","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":137,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Scheduling (production processes); Energy management; Demand response; Operator (biology); Load management; Energy management system; Computer science; Industrial production; Process (computing); Engineering; Mathematical optimization; Operations research; Industrial engineering; Electricity; Energy (signal processing); Electrical engineering; Operations management","score_opus":0.014886280474892998,"score_gpt":0.20006112449893168,"score_spread":0.1851748440240387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050071282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21603899,0.000019216362,0.7713186,0.00011284962,0.006935088,0.00017269363,0.00002499686,0.00028476998,0.0050928006],"genre_scores_gemma":[0.9983303,0.000056253735,0.00072208233,0.000065920394,0.00044511748,0.000101303376,0.000016802196,0.00005271757,0.00020951024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998591,0.00008063244,0.00047041918,0.00026729328,0.00027765922,0.0003129957],"domain_scores_gemma":[0.9993852,0.00007873463,0.000036057314,0.00038202008,0.000031129628,0.000086901324],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002655346,0.00024246408,0.00029355363,0.00042154704,0.000063849766,0.000028344097,0.00019431776,0.00017537658,0.00017117088],"category_scores_gemma":[0.000005428374,0.0002665711,0.00010967592,0.00039897568,0.0000450548,0.00021364784,0.0000022595527,0.00028366223,0.00004287632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041516938,0.00009701182,0.00013504527,0.000014151616,0.000052327574,0.0000021447984,0.0000635108,0.9867397,0.0015154866,0.00023774855,0.0018474994,0.009253877],"study_design_scores_gemma":[0.0032190664,0.00043242562,0.0011169289,0.00012331274,0.00008621799,0.000008217619,0.000074154894,0.67499727,0.23399362,0.000032309646,0.085175075,0.0007414226],"about_ca_topic_score_codex":0.00032432604,"about_ca_topic_score_gemma":0.000585894,"teacher_disagreement_score":0.7822913,"about_ca_system_score_codex":0.00013078406,"about_ca_system_score_gemma":0.000021753493,"threshold_uncertainty_score":0.99997866},"labels":[],"label_agreement":null},{"id":"W2050495423","doi":"10.1109/smartgrid.2010.5622077","title":"Optimal Real-Time Pricing Algorithm Based on Utility Maximization for Smart Grid","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1030,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart grid; Smart meter; Computer science; Energy consumption; Demand response; Distributed generation; Real-time computing; Distributed computing; Computer network; Electricity; Power (physics); Engineering","score_opus":0.006798743199524722,"score_gpt":0.2005144152834165,"score_spread":0.19371567208389176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050495423","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026795862,0.0000013520488,0.9180634,0.000114337694,0.0016824944,0.0003966995,0.000015353007,0.0009860038,0.051944476],"genre_scores_gemma":[0.24511153,0.000008300793,0.75112426,0.00021200236,0.00092263933,0.00020694427,0.00028667672,0.00013073755,0.001996932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999204,0.000009083608,0.00017747884,0.00021109835,0.00014691045,0.0002514614],"domain_scores_gemma":[0.99945444,0.00007615457,0.000018878955,0.00034540665,0.00003927696,0.00006581585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024058358,0.00015190635,0.00012785698,0.000099556004,0.000058525216,0.000035238423,0.000118706426,0.000074045995,0.00047750046],"category_scores_gemma":[0.00003193185,0.00014963027,0.000057027195,0.00012638903,0.000013930395,0.00008855868,0.00002213043,0.00010303122,0.00006219619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012865601,0.000039384693,0.00016458672,0.000038663977,0.000021009364,0.0000013963685,0.0000120705545,0.97017455,0.002120017,0.00031022177,0.013546406,0.013558831],"study_design_scores_gemma":[0.00035911327,0.000036624075,0.0031323337,0.000006200189,0.000013229648,3.8433421e-7,0.0000040842538,0.9720809,0.007300922,0.000017229473,0.016885819,0.00016320024],"about_ca_topic_score_codex":0.000038042905,"about_ca_topic_score_gemma":0.000014543339,"teacher_disagreement_score":0.21831566,"about_ca_system_score_codex":0.000042771888,"about_ca_system_score_gemma":0.000009514829,"threshold_uncertainty_score":0.61017454},"labels":[],"label_agreement":null},{"id":"W2052911113","doi":"10.1109/cdc.2014.7040146","title":"Distributed model predictive control of thermostatically controlled appliances for providing balancing service","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; Simon Fraser University","funders":"","keywords":"Model predictive control; Scheme (mathematics); Smart grid; Computer science; Controller (irrigation); Distributed computing; Grid; Control (management); Service model; Service (business); Distributed generation; Power (physics); Control theory (sociology); Engineering; Mathematics","score_opus":0.00665462875346874,"score_gpt":0.19533271545321207,"score_spread":0.18867808669974334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052911113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007984382,0.000024904872,0.98368365,0.0001785554,0.00011986102,0.0009566766,0.0000636303,0.00029574087,0.006692621],"genre_scores_gemma":[0.99170375,0.0000030898714,0.0074137226,0.00019511639,0.000068718255,0.00050496357,0.000024289868,0.000030932755,0.000055426135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990967,0.000014570982,0.00032587876,0.00015823283,0.00014920355,0.0002554038],"domain_scores_gemma":[0.99924713,0.00033721616,0.000056427863,0.00018108319,0.00012313318,0.000054998603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028099032,0.00015752517,0.00039124358,0.000037749945,0.000036043864,0.000018129325,0.00015592383,0.00004691709,0.000008657846],"category_scores_gemma":[0.00007444618,0.0001300399,0.00007026884,0.000102508355,0.000015752226,0.000089128946,0.000019578745,0.000049006583,0.0000027119454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021173821,0.000016045098,0.000094334224,0.00017594796,0.00019222876,9.057512e-8,0.0000574162,0.97866434,0.0046084663,0.015335066,0.00032594262,0.00031839026],"study_design_scores_gemma":[0.0053131646,0.00005351624,0.00013280874,0.000029162795,0.00008747038,1.3836373e-7,0.0000770746,0.9901362,0.00222308,0.0015228044,0.00028948282,0.00013508253],"about_ca_topic_score_codex":0.0000075765874,"about_ca_topic_score_gemma":0.000015100173,"teacher_disagreement_score":0.98371935,"about_ca_system_score_codex":0.000045537556,"about_ca_system_score_gemma":0.000010297676,"threshold_uncertainty_score":0.5302873},"labels":[],"label_agreement":null},{"id":"W2052933755","doi":"10.1007/s12667-012-0060-2","title":"Wind integration in self-regulating electric load distributions","year":2012,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Dispatchable generation; Wind power; Flexibility (engineering); Demand response; Computer science; Electrical load; Grid; Load shifting; Electric power system; Control engineering; Automotive engineering; Distributed generation; Renewable energy; Engineering; Power (physics); Electricity; Electrical engineering","score_opus":0.006490661063226309,"score_gpt":0.18682636388578316,"score_spread":0.18033570282255684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052933755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.722648,0.007185242,0.18904638,0.00005550388,0.00796544,0.00033807778,0.000008817831,0.0020328,0.07071972],"genre_scores_gemma":[0.99880177,0.000026902722,0.00013482074,0.0000057518178,0.00061281066,0.0000569946,0.000033863755,0.000028190449,0.00029886884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989811,0.00005056555,0.00027858152,0.000115109455,0.00019068019,0.0003839535],"domain_scores_gemma":[0.99962926,0.000033114757,0.000033359487,0.0002086754,0.000024957573,0.00007065744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025831445,0.000145905,0.00014837964,0.00014099613,0.00004448533,0.000038542672,0.00009605019,0.00007579131,0.000010385056],"category_scores_gemma":[0.000018937648,0.0001478652,0.000033786848,0.000514539,0.0000047930557,0.00023927585,0.000020964073,0.00008824547,0.000029583922],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001992883,0.000062028404,0.0064476603,0.000046990353,0.00007002049,0.0000024712654,0.00034571975,0.931637,0.0032410498,0.05164045,0.0039862976,0.002518338],"study_design_scores_gemma":[0.0003757008,0.000017983399,0.02258229,0.00011371464,0.000027020807,0.000014865078,0.00017291022,0.875666,0.0046246634,0.000041363128,0.095924184,0.00043930733],"about_ca_topic_score_codex":0.00042742564,"about_ca_topic_score_gemma":0.000095979376,"teacher_disagreement_score":0.27615377,"about_ca_system_score_codex":0.0006640308,"about_ca_system_score_gemma":0.000011017664,"threshold_uncertainty_score":0.6029768},"labels":[],"label_agreement":null},{"id":"W2053813838","doi":"10.4236/sgre.2011.23028","title":"Energy Consumption Control of an Air Conditioner Using Web Services","year":2011,"lang":"en","type":"article","venue":"Smart Grid and Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Air conditioning; Smart grid; Energy consumption; Control (management); Thermal comfort; Energy management; Grid; Architectural engineering; Automotive engineering; Information and Communications Technology; Consumption (sociology); Engineering; Energy (signal processing); Telecommunications; Computer science; Electrical engineering; World Wide Web","score_opus":0.011833178274336808,"score_gpt":0.18618184935921983,"score_spread":0.17434867108488303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053813838","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90177,0.0026424264,0.067714095,0.000018626588,0.005391367,0.0001245282,0.00011146533,0.00070957176,0.021517897],"genre_scores_gemma":[0.9974645,0.0005723519,0.0008348855,0.0001795415,0.00052634225,0.000023487604,0.00008718506,0.000051527397,0.00026020056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988507,0.00005571056,0.0003338021,0.00026922984,0.00017185423,0.00031871587],"domain_scores_gemma":[0.99937975,0.000021939693,0.00008080394,0.00031477687,0.00005442077,0.00014832037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113328795,0.0002463339,0.00030584307,0.000211855,0.00009560745,0.000017927732,0.00015352947,0.0001266756,0.00020907476],"category_scores_gemma":[0.000001408196,0.0002377447,0.00005954056,0.00014539802,0.0000934815,0.0003267977,0.000047441714,0.000048204372,0.0000023456128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006741747,0.00012032051,0.003472287,0.00026257115,0.00036313583,0.00002574344,0.00016800058,0.93515176,0.052741185,0.005133432,0.0014890422,0.0010051202],"study_design_scores_gemma":[0.0020577714,0.00015922397,0.0037834477,0.00013467653,0.00019451341,0.000039310027,0.00017649666,0.82031447,0.09968308,0.0007827963,0.07196301,0.0007112068],"about_ca_topic_score_codex":0.00562992,"about_ca_topic_score_gemma":0.002571896,"teacher_disagreement_score":0.11483728,"about_ca_system_score_codex":0.000035750545,"about_ca_system_score_gemma":0.000017743425,"threshold_uncertainty_score":0.96949476},"labels":[],"label_agreement":null},{"id":"W2053879174","doi":"10.1115/power2011-55200","title":"The Value of Demand Response (DR) to Mitigate Wind Integration Costs in a Smart Grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory","keywords":"Demand response; Variable renewable energy; Wind power; Electric power system; Grid; Environmental economics; Virtual power plant; Smart grid; Renewable energy; Base load power plant; Business; Computer science; Electricity; Distributed generation; Electrical engineering; Engineering; Power (physics); Economics","score_opus":0.012211329237950876,"score_gpt":0.20497665421942407,"score_spread":0.1927653249814732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053879174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97268665,0.000039398674,0.0067782234,0.00020920044,0.00049651775,0.00020007543,0.0000013691824,0.00007683627,0.019511744],"genre_scores_gemma":[0.9984753,0.000016792286,0.0008186499,0.000065735956,0.000027958022,0.000022516115,0.0000013023706,0.00001551372,0.000556228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993694,0.0000652884,0.00020854181,0.00009592578,0.000103610415,0.00015722537],"domain_scores_gemma":[0.99958867,0.000095188174,0.0000145912945,0.0002383743,0.000020554928,0.000042633506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057156954,0.00008869894,0.00008887485,0.00011115966,0.000022057133,0.000012409368,0.00014069396,0.000030330815,0.000034217606],"category_scores_gemma":[0.000082256825,0.00006465006,0.000024682955,0.00020713477,0.000019128338,0.00006553448,0.00004268364,0.000061066195,0.000038058104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025980931,0.00020229175,0.025410505,0.0000983934,0.0003407503,0.000068951944,0.010831335,0.7256226,0.07077581,0.064420864,0.07669454,0.022935886],"study_design_scores_gemma":[0.0007366261,0.00020168097,0.7044264,0.00013653538,0.00002179526,0.0000032326113,0.00078773644,0.09039848,0.17368189,0.0005076826,0.028745046,0.00035287294],"about_ca_topic_score_codex":0.00024690994,"about_ca_topic_score_gemma":0.0011802325,"teacher_disagreement_score":0.67901593,"about_ca_system_score_codex":0.000082349354,"about_ca_system_score_gemma":0.000007190403,"threshold_uncertainty_score":0.2636353},"labels":[],"label_agreement":null},{"id":"W2054226561","doi":"10.1016/j.rser.2012.06.027","title":"Assessing the economic value of renewable distributed generation in the Northeastern American market","year":2012,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; HEC Montréal","funders":"","keywords":"Renewable energy; Wind power; Environmental economics; Greenhouse gas; Carbon tax; Electricity; Subsidy; Economics; Natural resource economics; Electricity generation; Engineering","score_opus":0.014980561801331161,"score_gpt":0.24363819848098178,"score_spread":0.2286576366796506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054226561","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6570508,0.14803974,0.10091179,0.0011455367,0.0012890579,0.0018663247,0.000019758989,0.00023222728,0.08944474],"genre_scores_gemma":[0.9812105,0.015944924,0.00022321292,0.00017247841,0.0003826979,0.00019926242,0.00005333463,0.000032871503,0.0017807735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99822026,0.0003441133,0.000509661,0.00018299163,0.00012949861,0.0006134973],"domain_scores_gemma":[0.9991507,0.00009972957,0.00014479975,0.00051691,0.000023944236,0.00006389349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019894305,0.0002267969,0.00040867037,0.000099296725,0.00015886052,0.00013211585,0.00027368387,0.000044199704,0.000026703681],"category_scores_gemma":[0.000041351206,0.00014432508,0.000079706624,0.00042241506,0.00007418222,0.00050693087,0.00009513908,0.00008224597,0.000001673605],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031763252,0.000024780193,0.0030572629,0.00020825684,0.00003619435,0.0000034196466,0.00018768014,0.968198,0.000101012985,0.0031674334,0.017429523,0.0075832303],"study_design_scores_gemma":[0.00015221906,0.000020295041,0.0017188628,0.000038157992,0.00004875947,0.000007934035,0.002063352,0.1627141,0.0003774478,0.00012755896,0.83252794,0.00020336933],"about_ca_topic_score_codex":0.011611426,"about_ca_topic_score_gemma":0.0014862732,"teacher_disagreement_score":0.8150984,"about_ca_system_score_codex":0.00022395,"about_ca_system_score_gemma":0.000037876307,"threshold_uncertainty_score":0.9949703},"labels":[],"label_agreement":null},{"id":"W2055728138","doi":"10.1177/0037549712470732","title":"Real-time pricing program in a smart grid environment","year":2013,"lang":"en","type":"article","venue":"SIMULATION","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Smart grid; Computer science; Grid; Reliability (semiconductor); Realization (probability); Electric power system; Smart meter; Reliability engineering; Real-time computing; Embedded system; Simulation; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.0065075805067344806,"score_gpt":0.20297160991703653,"score_spread":0.19646402941030205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055728138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9843173,0.000013149177,0.002824317,0.00003671488,0.00019610458,0.00061676616,3.8543138e-7,0.00046851698,0.01152676],"genre_scores_gemma":[0.9969685,0.000015736969,0.0025303578,0.000007999837,0.00009728373,0.00013750116,0.000022204224,0.000023796325,0.0001966306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994301,0.000012739269,0.00015806216,0.00011457029,0.000112986265,0.00017150305],"domain_scores_gemma":[0.9997685,0.000026887306,0.000015237128,0.00015461117,0.0000052446594,0.00002953905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006615294,0.00008883013,0.00007796813,0.00008735081,0.000015932861,0.000024416504,0.00004769638,0.000035880148,0.00025800124],"category_scores_gemma":[0.0000054849743,0.00009476078,0.000018684585,0.00009899276,0.0000065995155,0.00015590683,0.0000235312,0.00004765701,0.00064513646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.3946315e-7,0.000019371411,0.0026300605,0.000012081019,0.0000068694585,8.681313e-7,0.000069163245,0.98219025,0.0012087759,0.000021486781,0.00023154942,0.013608696],"study_design_scores_gemma":[0.00015381219,0.000015680504,0.11712233,0.0000100892175,0.0000033043043,6.960152e-8,0.000007077301,0.8772096,0.00016486576,0.000067159875,0.005153994,0.00009203751],"about_ca_topic_score_codex":0.00009915233,"about_ca_topic_score_gemma":0.0000047757676,"teacher_disagreement_score":0.11449227,"about_ca_system_score_codex":0.000150085,"about_ca_system_score_gemma":0.0000015430209,"threshold_uncertainty_score":0.8292139},"labels":[],"label_agreement":null},{"id":"W2057308010","doi":"10.1109/tsg.2014.2313612","title":"Optimal Bidding Strategy for Microgrids Considering Renewable Energy and Building Thermal Dynamics","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":375,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"","keywords":"Bidding; Microgrid; Renewable energy; Computer science; Mathematical optimization; Exploit; Scheduling (production processes); Electric power system; Stochastic programming; Demand response; Stochastic optimization; Flexibility (engineering); Electricity; Engineering; Power (physics); Economics; Microeconomics","score_opus":0.01230317281627084,"score_gpt":0.21150275610305472,"score_spread":0.1991995832867839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057308010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11368437,0.00006899106,0.88201874,0.000050795596,0.0019941148,0.00013183433,0.000033531775,0.0004308016,0.0015868117],"genre_scores_gemma":[0.9860954,0.00009154185,0.012861525,0.00007488936,0.00033095738,0.00013298084,0.00001083984,0.00009912737,0.0003027125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987507,0.000027415355,0.00028953236,0.00033401235,0.00013626815,0.00046210343],"domain_scores_gemma":[0.9993614,0.0001679952,0.00003337028,0.0002807867,0.00003283686,0.00012362235],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019547882,0.00029108688,0.00025659575,0.00022964909,0.00024412574,0.000111456444,0.00013367941,0.00011387737,0.000032551514],"category_scores_gemma":[0.000003444704,0.0003253417,0.00010586207,0.00016583035,0.000054905566,0.00019861854,0.0000033174551,0.00013621146,0.0000033289448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002062193,0.000024162695,0.000014370531,0.000056277135,0.000111673304,0.000001994063,0.00003009119,0.9747708,0.009894971,0.00029424997,0.00065592345,0.014124902],"study_design_scores_gemma":[0.0005997076,0.00011487095,0.00004606362,0.00004498338,0.00006685904,0.000014141788,0.00006832774,0.8862526,0.09423584,0.000052021707,0.018139098,0.00036549178],"about_ca_topic_score_codex":0.0002312187,"about_ca_topic_score_gemma":0.0006571993,"teacher_disagreement_score":0.8724111,"about_ca_system_score_codex":0.0001322472,"about_ca_system_score_gemma":0.000012826156,"threshold_uncertainty_score":0.9999199},"labels":[],"label_agreement":null},{"id":"W2059033491","doi":"10.1016/j.adhoc.2010.08.005","title":"Wireless multimedia sensor and actor networks for the next generation power grid","year":2010,"lang":"en","type":"article","venue":"Ad Hoc Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":172,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Wireless sensor network; SCADA; Wireless; Grid; Key distribution in wireless sensor networks; Wireless network; Embedded system; Telecommunications; Distributed computing; Computer network; Engineering; Electrical engineering","score_opus":0.016011097090121894,"score_gpt":0.2067887693126555,"score_spread":0.1907776722225336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059033491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5013939,0.0062852493,0.465074,0.0005383024,0.024318239,0.0011895254,0.000011240178,0.00064941647,0.0005401257],"genre_scores_gemma":[0.9901364,0.0017151472,0.0026941553,0.00026610997,0.004688052,0.00016898532,0.000058578786,0.00008158126,0.00019100192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907815,0.000015654527,0.00019159185,0.0002254851,0.000105682106,0.00038342713],"domain_scores_gemma":[0.9992046,0.00025934848,0.000035599496,0.00037088906,0.000037303038,0.00009228117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001992929,0.00021019264,0.0001559087,0.00003204017,0.000159108,0.00013212813,0.0001660315,0.00017640204,0.000053426887],"category_scores_gemma":[0.000015913849,0.00016665734,0.00005874546,0.000109957924,0.000055288307,0.00014856739,0.00005796405,0.00034922233,0.000006579204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012356688,0.000008569654,0.00013138555,0.000007163907,0.000091178204,0.000002055629,0.000077860626,0.8968243,0.0012926357,0.0001924154,0.037148412,0.06421167],"study_design_scores_gemma":[0.00031107,0.000019447132,0.0018356662,0.000006155614,0.00003601446,0.0000027605856,0.000025731322,0.8819325,0.00009956356,0.00000427355,0.11553999,0.00018681436],"about_ca_topic_score_codex":0.000004271606,"about_ca_topic_score_gemma":0.00023412213,"teacher_disagreement_score":0.4887425,"about_ca_system_score_codex":0.000021271697,"about_ca_system_score_gemma":0.000004406234,"threshold_uncertainty_score":0.67960894},"labels":[],"label_agreement":null},{"id":"W2063136778","doi":"10.1109/tsg.2014.2313347","title":"A Distributed Demand Response Control Strategy Using Lyapunov Optimization","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Lyapunov optimization; HVAC; Demand response; Computer science; Mathematical optimization; Control theory (sociology); Optimization problem; Queueing theory; Power control; Engineering; Control (management); Control engineering; Power (physics); Air conditioning; Lyapunov equation; Mathematics","score_opus":0.011175270329871284,"score_gpt":0.2088614006157398,"score_spread":0.1976861302858685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063136778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05295184,0.000017557611,0.94379324,0.000070872215,0.0019586857,0.00022551762,0.00009441349,0.0005687245,0.00031917365],"genre_scores_gemma":[0.99717796,0.00001898605,0.0023141517,0.00008675381,0.0001890839,0.00005511433,0.000020118765,0.0000654431,0.000072393224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986664,0.000163923,0.00032248412,0.00026582403,0.00022799394,0.0003533504],"domain_scores_gemma":[0.99922544,0.00017065687,0.000038309405,0.0003863813,0.000053020147,0.00012620144],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037890274,0.00026223707,0.0002410503,0.00022881241,0.00018927007,0.0000736543,0.00014076047,0.00011494739,0.00013519725],"category_scores_gemma":[0.000009670939,0.0002822186,0.000107184664,0.000358189,0.000040695002,0.0002054154,9.381248e-7,0.00020420528,0.000050103652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022287638,0.00004998049,0.000013779494,0.000017925247,0.000101986116,0.000005297604,0.00001987065,0.99652493,0.0019644084,0.000017585517,0.00046673926,0.000594635],"study_design_scores_gemma":[0.0012135432,0.000104937564,0.00036897644,0.00002818818,0.00009908142,0.000012113752,0.00001664264,0.9884038,0.0053156153,0.000009331066,0.0041357735,0.00029197618],"about_ca_topic_score_codex":0.000026817814,"about_ca_topic_score_gemma":0.000022353961,"teacher_disagreement_score":0.9442261,"about_ca_system_score_codex":0.00018903964,"about_ca_system_score_gemma":0.000019909985,"threshold_uncertainty_score":0.999963},"labels":[],"label_agreement":null},{"id":"W2064740578","doi":"10.1109/pimrc.2011.6139654","title":"Web services for indoor energy management in a smart grid environment","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; HVAC; Thermostat; Computer science; Home automation; Demand response; The Internet; Service provider; Smart meter; Web service; Computer network; Service (business); Telecommunications; Air conditioning; World Wide Web; Engineering; Electricity; Electrical engineering","score_opus":0.010084887185893942,"score_gpt":0.1641890799949592,"score_spread":0.15410419280906523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064740578","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18349135,0.0005781715,0.06884515,0.00019353723,0.003313621,0.001432891,0.000024962817,0.0014487663,0.7406716],"genre_scores_gemma":[0.9791428,0.00052282563,0.016178224,0.00035788346,0.00013500998,0.0008666116,0.000030775627,0.00007105257,0.0026948287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99905944,0.000008922097,0.0002350114,0.00023241028,0.00012794374,0.00033626874],"domain_scores_gemma":[0.99959874,0.0000106987045,0.000017204185,0.0003103786,0.0000037166362,0.000059254577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010324971,0.00018384856,0.00014253276,0.00018900922,0.000021567741,0.000014460368,0.00023061366,0.000047269863,0.0004412609],"category_scores_gemma":[3.501834e-7,0.00018336953,0.000051412047,0.000098650344,0.000011218691,0.00010594799,0.000116821764,0.000039507315,0.00008142476],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037220228,0.0016546033,0.035084322,0.0033804406,0.0030539504,0.0003700268,0.0031194638,0.40947032,0.0027937146,0.32095823,0.07721094,0.1425318],"study_design_scores_gemma":[0.0017111305,0.00007169574,0.020733796,0.000036438163,0.0000528473,0.000001474129,0.0003028755,0.15456899,0.0045567914,0.0008924922,0.81650877,0.0005627082],"about_ca_topic_score_codex":0.00014598688,"about_ca_topic_score_gemma":0.00044271734,"teacher_disagreement_score":0.79565144,"about_ca_system_score_codex":0.000101950885,"about_ca_system_score_gemma":0.000001684583,"threshold_uncertainty_score":0.7477592},"labels":[],"label_agreement":null},{"id":"W2065141020","doi":"10.1109/smartgridcomm.2013.6687961","title":"Critiquing Time-of-Use pricing in Ontario","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Aggregate (composite); Peak load; Metering mode; Software deployment; Computer science; Econometrics; Environmental economics; Operations research; Economics; Mathematics; Automotive engineering; Engineering","score_opus":0.008743665795431245,"score_gpt":0.16649301408699632,"score_spread":0.1577493482915651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065141020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9399851,0.000009976435,0.004104525,0.000019055336,0.00013644,0.000091633134,5.5523547e-8,0.00014187398,0.05551132],"genre_scores_gemma":[0.990948,0.000002562585,0.00564594,0.000041169005,0.000014472071,0.000016609505,0.0000015508364,0.000015414074,0.003314258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99956745,0.000004953123,0.00014516592,0.0000711318,0.00006564078,0.00014564811],"domain_scores_gemma":[0.9998011,0.000028640226,0.000006592266,0.0001305347,0.000010264494,0.00002287954],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005016645,0.00006617803,0.00008868947,0.00009688019,0.0000058872383,0.00002004352,0.00006528056,0.0000232364,0.0012549442],"category_scores_gemma":[0.000007846163,0.00006651786,0.000017364617,0.000082548955,0.00000570556,0.00023974093,0.00003298065,0.00006837076,0.00016750247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018978387,0.000044421366,0.12457795,0.00007296842,0.00005376048,0.00001020746,0.0012437726,0.83554316,0.016748391,0.002609734,0.01628458,0.002809151],"study_design_scores_gemma":[0.0003931156,0.00002795064,0.7017556,0.0000990976,0.000008784042,0.000001404738,0.00013428545,0.27734226,0.006941367,0.00020420499,0.012750523,0.00034143226],"about_ca_topic_score_codex":0.06665292,"about_ca_topic_score_gemma":0.048089225,"teacher_disagreement_score":0.57717764,"about_ca_system_score_codex":0.00011878652,"about_ca_system_score_gemma":0.0000036304223,"threshold_uncertainty_score":0.99965805},"labels":[],"label_agreement":null},{"id":"W2066247907","doi":"10.1109/epec.2010.5697216","title":"A centralized controller to control power demands of electric water heaters for peek shaving of total house-hold power demands","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Peaking power plant; Controller (irrigation); Water heater; Electric power; Electric heating; Power (physics); Peak demand; Electric energy consumption; Energy storage; Automotive engineering; Electricity; Storage heater; Computer science; Environmental science; Electric energy; Engineering; Electrical engineering; Mechanical engineering; Distributed generation; Renewable energy; Heat pump","score_opus":0.0031361933928525745,"score_gpt":0.18565064467241307,"score_spread":0.1825144512795605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066247907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9570527,0.00003478587,0.0386435,0.00022671904,0.00087382103,0.00083165703,0.000012410399,0.00031231384,0.0020121133],"genre_scores_gemma":[0.9978336,0.0000033581025,0.00111187,0.0002141736,0.000063770196,0.00014065382,0.000004362226,0.00010838955,0.0005198203],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9981826,0.00001753035,0.0005824535,0.0002732203,0.00026116648,0.00068304414],"domain_scores_gemma":[0.99923754,0.00009259438,0.000047461388,0.00034771021,0.00011318703,0.00016150204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033734023,0.00028970808,0.0005947057,0.00029667345,0.00003671435,0.000028560415,0.00021144419,0.00012701527,0.0003968788],"category_scores_gemma":[0.000042299962,0.00022068198,0.00023970714,0.00017276837,0.000024016306,0.00011887357,0.000045756824,0.0001362053,0.000016523116],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006352609,0.000120191275,0.0021694812,0.0000971893,0.00061198435,0.0000043822147,0.0005176037,0.09266671,0.8945496,0.001504528,0.006955305,0.00016773606],"study_design_scores_gemma":[0.0220792,0.0010844966,0.023230467,0.000066937064,0.00039909602,0.00001527213,0.00017195077,0.12935595,0.81203336,0.0001311749,0.010184046,0.0012480314],"about_ca_topic_score_codex":0.00003857026,"about_ca_topic_score_gemma":0.000026116291,"teacher_disagreement_score":0.08251625,"about_ca_system_score_codex":0.00004385801,"about_ca_system_score_gemma":0.000010156167,"threshold_uncertainty_score":0.899915},"labels":[],"label_agreement":null},{"id":"W2067086181","doi":"10.1080/10485230709509729","title":"More Than 10 Ways To Sweeten A Retail Power Contract","year":2007,"lang":"en","type":"article","venue":"Strategic Planning for Energy and the Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Procurement; Marketing; Purchasing; Leverage (statistics); Computer science","score_opus":0.01690467085464529,"score_gpt":0.20233104147764858,"score_spread":0.1854263706230033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067086181","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6320918,0.001983277,0.23511904,0.00064052583,0.0008162894,0.00055647653,0.000025483823,0.00035033096,0.12841675],"genre_scores_gemma":[0.99784887,0.000048424714,0.0006511537,0.00020516106,0.00011249873,0.000076196084,0.00002382556,0.00003411364,0.0009997451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99901724,0.000009592833,0.00020788846,0.00021519765,0.00015836213,0.0003917084],"domain_scores_gemma":[0.9994829,0.000119501776,0.000030422027,0.00024619183,0.0000036944512,0.00011728816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004190547,0.00020753195,0.00018563845,0.000057050263,0.00012078315,0.000036561774,0.00015553989,0.00007143306,0.00008386855],"category_scores_gemma":[0.0000050069434,0.00015250935,0.00006467396,0.00004893964,0.00007730309,0.00004789397,0.000047825255,0.00007485138,0.000010735585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033434835,0.0000266716,0.00010950708,0.000018135677,0.00032391062,0.00003737077,0.000790116,0.8111547,0.0010633302,0.1836463,0.0011497563,0.0013458057],"study_design_scores_gemma":[0.0076985382,0.00069475954,0.01447728,0.00015314225,0.00032724638,0.000040969353,0.003032471,0.10224198,0.008508043,0.020972185,0.8400787,0.001774691],"about_ca_topic_score_codex":0.000027569353,"about_ca_topic_score_gemma":0.000011804914,"teacher_disagreement_score":0.83892894,"about_ca_system_score_codex":0.000056222434,"about_ca_system_score_gemma":0.0000033481333,"threshold_uncertainty_score":0.6219151},"labels":[],"label_agreement":null},{"id":"W2069074275","doi":"10.1109/smartgridcomm.2011.6102353","title":"A game-theoretical decision-making scheme for electricity retailers in the smart grid with demand-side management","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Stackelberg competition; Smart grid; Procurement; Electricity; Electricity market; Demand response; Grid; Game theory; Electricity retailing; Computer science; Scheme (mathematics); Environmental economics; Demand side; Business; Operations research; Microeconomics; Marketing; Economics","score_opus":0.010680650758036737,"score_gpt":0.2075209571288451,"score_spread":0.19684030637080838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069074275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18920472,0.000063899955,0.6427103,0.00007202537,0.00027043256,0.0009198937,0.0000013782995,0.00032182632,0.16643551],"genre_scores_gemma":[0.944068,0.000034545752,0.05513919,0.00030227585,0.00006278618,0.00029739263,0.00000305256,0.000042801843,0.0000499492],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864614,0.000030669995,0.00027607506,0.00028259415,0.00028690769,0.0004776357],"domain_scores_gemma":[0.9992382,0.00022125845,0.00002400775,0.00044687768,0.00002352315,0.000046129506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006110376,0.00021771315,0.00018653841,0.00019737886,0.00005037891,0.000042291103,0.00040651785,0.000054866134,0.00014168542],"category_scores_gemma":[0.000029562434,0.00014378942,0.000067162844,0.00043788718,0.00006289508,0.00010236141,0.00006765685,0.00014964578,0.000025682406],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005185574,0.00021124168,0.008568228,0.00025108876,0.0004687172,0.00020456708,0.0010267447,0.04900862,0.000033016186,0.90904677,0.0111155035,0.019546943],"study_design_scores_gemma":[0.0048395135,0.0007464326,0.10278279,0.0007666681,0.00039281388,0.00006938586,0.0020677138,0.7643994,0.0023158046,0.083266705,0.036284093,0.0020686612],"about_ca_topic_score_codex":0.000008351767,"about_ca_topic_score_gemma":0.00009460531,"teacher_disagreement_score":0.8257801,"about_ca_system_score_codex":0.00009415383,"about_ca_system_score_gemma":0.0000055964842,"threshold_uncertainty_score":0.5863562},"labels":[],"label_agreement":null},{"id":"W2070599540","doi":"10.1109/pvsc.2013.6744304","title":"Utility scale PV plant variability and energy storage for ramp rate control","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy storage; Photovoltaic system; Reliability engineering; Power station; Environmental science; Scale (ratio); Computer science; Automotive engineering; Load shifting; Control (management); Power (physics); Engineering; Electrical engineering; Electricity","score_opus":0.00542467076731364,"score_gpt":0.16624734823821188,"score_spread":0.16082267747089823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070599540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1959088,0.000046015106,0.78294504,0.00021070545,0.00066472316,0.000362791,0.000046327976,0.00037940926,0.019436201],"genre_scores_gemma":[0.9969658,0.000013198194,0.0016590764,0.00016947005,0.00009418486,0.00018915237,0.000017417287,0.000020117875,0.0008715586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992167,0.00004314737,0.00018781832,0.00022460906,0.00006840792,0.00025935585],"domain_scores_gemma":[0.99936116,0.00019997307,0.000014979651,0.00029315607,0.000032021908,0.00009873534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033728027,0.00014556825,0.00018611099,0.00003365571,0.000043493215,0.000049384504,0.00008975095,0.000059224338,0.00042202804],"category_scores_gemma":[0.000029822506,0.00012801308,0.000040074658,0.000048937116,0.000032956814,0.00013494537,0.000034776618,0.000046280304,0.000015483141],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018741493,0.00042254734,0.02255186,0.0009137969,0.0010249228,0.000009012404,0.00035539715,0.6070303,0.023238178,0.058414605,0.20655082,0.079301156],"study_design_scores_gemma":[0.000740452,0.000020554004,0.027345965,0.0000034996203,0.000019628671,7.063191e-7,0.000018595692,0.902882,0.0017250382,0.0009066153,0.06615247,0.00018447272],"about_ca_topic_score_codex":0.00019964995,"about_ca_topic_score_gemma":0.00009435131,"teacher_disagreement_score":0.80105704,"about_ca_system_score_codex":0.0000362536,"about_ca_system_score_gemma":0.000005283474,"threshold_uncertainty_score":0.5220222},"labels":[],"label_agreement":null},{"id":"W2071232075","doi":"10.1016/j.enpol.2011.07.038","title":"A comparison of four methods to evaluate the effect of a utility residential air-conditioner load control program on peak electricity use","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; National Research Council Canada","funders":"","keywords":"Thermostat; Air conditioning; Control (management); Event (particle physics); Operations management; Electricity; Peak load; Regression analysis; Demand response; Statistics; Cycling; Econometrics; Environmental economics; Operations research; Agricultural economics; Economics; Engineering; Mathematics; Geography; Automotive engineering","score_opus":0.04281479025599804,"score_gpt":0.355821444402578,"score_spread":0.31300665414657997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071232075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.923384,0.00009175851,0.0643203,0.00013745674,0.0004208118,0.00075493765,0.000019238278,0.00034420838,0.010527281],"genre_scores_gemma":[0.99710083,0.000004566687,0.0021478499,0.00010264363,0.00018830365,0.00029675566,0.000004928594,0.000037453647,0.00011664263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9978209,0.00070538785,0.00045827916,0.00023372106,0.00040451426,0.00037719295],"domain_scores_gemma":[0.9986949,0.0003823885,0.000091799746,0.000638521,0.00009324956,0.00009917387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010056155,0.00024806216,0.00048487505,0.0002677427,0.000054655757,0.0000147069895,0.00032968796,0.00008342527,0.000052292824],"category_scores_gemma":[0.00047870007,0.00018350239,0.0001808142,0.0005998114,0.00007038992,0.00008456913,0.00007043474,0.00014488662,0.00000843299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002269002,0.0009091676,0.0089400215,0.00032807933,0.002299316,0.0000113810165,0.0021119497,0.7401682,0.025523266,0.03698919,0.022527657,0.15792273],"study_design_scores_gemma":[0.002207005,0.0020633773,0.24600334,0.00005184711,0.00033760487,0.0000025152058,0.000015850817,0.12711087,0.6078954,0.0004851215,0.013439792,0.00038732897],"about_ca_topic_score_codex":0.0061949254,"about_ca_topic_score_gemma":0.00036565136,"teacher_disagreement_score":0.6130574,"about_ca_system_score_codex":0.00014679944,"about_ca_system_score_gemma":0.000040633207,"threshold_uncertainty_score":0.93649155},"labels":[],"label_agreement":null},{"id":"W2073325490","doi":"10.1109/epec.2013.6802917","title":"Demand request dispatch approach for electric distribution systems","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"London Hydro","funders":"","keywords":"Smart grid; Bidding; Demand response; Computer science; Flexibility (engineering); Interoperability; Electricity; Schedule; Thermostat; Testbed; Electricity market; Smart meter; Grid; Electric utility; Load management; Home automation; Peak demand; Telecommunications; Electrical engineering; Business; Engineering; Computer network; Economics","score_opus":0.006438320414579433,"score_gpt":0.17269064880894036,"score_spread":0.16625232839436094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073325490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021828625,0.00022825196,0.9605706,0.000026564041,0.00036433947,0.0006146832,0.0000050621998,0.0004914151,0.015870476],"genre_scores_gemma":[0.99611133,0.000030571813,0.0014593811,0.000010398862,0.0002080368,0.00082724384,0.00020718283,0.000025768899,0.0011201071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993651,0.000008957988,0.00014930406,0.00013443979,0.000087697634,0.0002544837],"domain_scores_gemma":[0.9997006,0.000021508738,0.000013020947,0.000179985,0.00003302473,0.000051834708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009536896,0.00010923776,0.00011039167,0.000035090547,0.000038298676,0.00007302749,0.00009451166,0.000048699396,0.00001680466],"category_scores_gemma":[0.000010068339,0.00009506596,0.00003300499,0.00014944524,0.0000047784256,0.00013682249,0.000014478112,0.00004260965,0.00005030692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021975604,0.000034692177,0.0009098879,0.00033007003,0.000086029984,3.4639206e-7,0.000011769905,0.77561027,0.0015694792,0.023490094,0.19669494,0.0012602415],"study_design_scores_gemma":[0.00015494224,0.000018030869,0.0024931994,0.000004508515,0.000013876469,0.0000014437013,0.000020181235,0.98350096,0.0007588812,0.00006574296,0.01282507,0.00014315847],"about_ca_topic_score_codex":0.00013369347,"about_ca_topic_score_gemma":0.0000025026816,"teacher_disagreement_score":0.9742827,"about_ca_system_score_codex":0.000107556414,"about_ca_system_score_gemma":0.0000024994667,"threshold_uncertainty_score":0.38766772},"labels":[],"label_agreement":null},{"id":"W2073414138","doi":"10.1109/epec.2012.6474987","title":"Smart energy monitoring and management system for industrial applications","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Energy consumption; Energy management; Energy management system; Scheduling (production processes); Computer science; Fuzzy inference; Energy (signal processing); Efficient energy use; Energy accounting; Fuzzy logic; Risk analysis (engineering); Engineering; Operations management; Business; Fuzzy control system; Adaptive neuro fuzzy inference system; Artificial intelligence","score_opus":0.02336864558465153,"score_gpt":0.21139338738888852,"score_spread":0.188024741804237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073414138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075678616,0.0006141478,0.8875172,0.000044230703,0.0033747894,0.0007880652,0.0000066806833,0.0012463373,0.09884067],"genre_scores_gemma":[0.9897861,0.00007227614,0.0062899427,0.000007096395,0.001371065,0.0014817782,0.0000079246665,0.00003195169,0.00095186156],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99946374,0.000004654982,0.00012524209,0.000096246215,0.00007437559,0.00023575345],"domain_scores_gemma":[0.99971455,0.000021019976,0.000011008915,0.00016595583,0.000007938269,0.00007954738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009798349,0.00009707433,0.0000827376,0.000073286814,0.000054035863,0.000024698214,0.00007037041,0.000042954707,0.000004468647],"category_scores_gemma":[8.21983e-7,0.000098447366,0.000021872858,0.00008808987,0.000006467452,0.00009632632,0.000048999125,0.00002642866,0.000006832079],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014934305,0.00007164527,0.014147207,0.0010530904,0.0007121345,0.0000014248624,0.0000952073,0.035226215,0.0005621407,0.7573598,0.027250782,0.16350539],"study_design_scores_gemma":[0.00049425603,0.000007694753,0.0017070548,0.00002604532,0.00006302955,0.0000018073213,0.00027687204,0.0050108046,0.004808872,0.000024399013,0.98737717,0.00020200228],"about_ca_topic_score_codex":0.000015205147,"about_ca_topic_score_gemma":0.0000014495578,"teacher_disagreement_score":0.98221827,"about_ca_system_score_codex":0.00008370752,"about_ca_system_score_gemma":8.944311e-7,"threshold_uncertainty_score":0.4014567},"labels":[],"label_agreement":null},{"id":"W2074230582","doi":"10.1109/infocom.2014.6848233","title":"Optimal Combined Heat and Power system scheduling in smart grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Lyapunov optimization; Computer science; Mathematical optimization; Queueing theory; Smart grid; Optimization problem; Scheduling (production processes); Renewable energy; Convex optimization; Stochastic optimization; Computer network; Engineering; Regular polygon; Lyapunov equation; Electrical engineering; Mathematics","score_opus":0.004524337131012219,"score_gpt":0.17230556132754998,"score_spread":0.16778122419653776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074230582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92769283,0.00006261943,0.021791918,0.00007242804,0.0008786407,0.00009162649,3.6872694e-7,0.00045798777,0.048951603],"genre_scores_gemma":[0.99540323,0.000005650319,0.004330362,0.000041798077,0.00006763353,0.000014428736,0.0000025761465,0.000023966742,0.00011035286],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994028,0.000015803185,0.00015679581,0.00013697377,0.00008606355,0.00020151884],"domain_scores_gemma":[0.9997337,0.000027404389,0.00000500898,0.0001705546,0.00000791092,0.000055463715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018585839,0.00011351882,0.00014446118,0.00009820731,0.000020231602,0.000032716154,0.000070609014,0.00004039772,0.000028474233],"category_scores_gemma":[0.000008031529,0.00011014341,0.000017442111,0.000096950855,0.0000108154,0.0000766969,0.000053062835,0.00007360066,0.000041165164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004807807,0.0000075406197,0.004355441,0.00008567432,0.000018754201,0.0000049183595,0.00004368919,0.98486006,0.00028507737,0.009613567,0.0006329065,0.00008754035],"study_design_scores_gemma":[0.0005960975,0.000033757962,0.012113309,0.000053947417,0.0000055250403,0.000003807112,0.0001508376,0.9814314,0.00069308415,0.0000051091097,0.0047397506,0.00017336578],"about_ca_topic_score_codex":0.00004999365,"about_ca_topic_score_gemma":0.000028130456,"teacher_disagreement_score":0.06771043,"about_ca_system_score_codex":0.00005834014,"about_ca_system_score_gemma":0.0000016824976,"threshold_uncertainty_score":0.44915178},"labels":[],"label_agreement":null},{"id":"W2074544703","doi":"10.1109/isgteurope.2012.6465896","title":"Residential energy management using a moving window algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Window (computing); Baseline (sea); Energy consumption; Scope (computer science); Greenhouse gas; Scheduling (production processes); Smart grid; Energy management; Grid; Algorithm; Energy (signal processing); Real-time computing; Mathematical optimization; Engineering; Statistics; Mathematics","score_opus":0.009405769269170045,"score_gpt":0.19915924305106775,"score_spread":0.1897534737818977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074544703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01697586,0.00040564433,0.88924927,0.000016363825,0.0023634082,0.00008350308,0.0000010271372,0.0007211277,0.0901838],"genre_scores_gemma":[0.892579,0.000101570666,0.10238732,0.00015944333,0.0012663618,0.00003103506,0.000008142028,0.000090100046,0.0033770336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988937,0.000016595348,0.00019353715,0.00014242863,0.00023810107,0.0005156575],"domain_scores_gemma":[0.9995581,0.000010342603,0.000016773069,0.0002885951,0.000010330703,0.00011586002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013641024,0.00017431322,0.00012349099,0.00018468489,0.000063957814,0.000047528025,0.00015423723,0.000045559806,0.00029925627],"category_scores_gemma":[0.0000015788997,0.00018420478,0.00005757522,0.00020515014,0.000013218692,0.00033542124,0.00015963108,0.00005621006,0.000062210755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062878457,0.00011241562,0.0016540315,0.00014696558,0.00083251734,0.000080174475,0.00021958636,0.7803009,0.002832172,0.047281705,0.02571175,0.14082147],"study_design_scores_gemma":[0.0006871749,0.000012775354,0.009024785,0.000047828897,0.00015293605,0.000023903747,0.00024537073,0.81005484,0.012916793,0.00023353318,0.16579893,0.0008011249],"about_ca_topic_score_codex":0.00015380446,"about_ca_topic_score_gemma":0.000014062398,"teacher_disagreement_score":0.87560314,"about_ca_system_score_codex":0.00014921934,"about_ca_system_score_gemma":0.00000227196,"threshold_uncertainty_score":0.7511653},"labels":[],"label_agreement":null},{"id":"W2075435130","doi":"10.1016/j.egypro.2014.07.069","title":"Investment Incentive of Grid Connected Solar Photovoltaic Power Plant under Proposed Feed-in Tariffs Framework in Thailand","year":2014,"lang":"en","type":"article","venue":"Energy Procedia","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Resources Canada; Thammasat University","keywords":"Photovoltaic system; Renewable energy; Net metering; Grid parity; Feed-in tariff; Electricity; Zero-energy building; Environmental economics; Solar power; Photovoltaics; Environmental science; Microgrid; Solar energy; Environmental engineering; Engineering; Distributed generation; Electrical engineering; Economics; Power (physics); Energy policy; Physics","score_opus":0.0045362858638961145,"score_gpt":0.17211419416392984,"score_spread":0.16757790830003372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075435130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9676345,0.00040371844,0.016995167,0.000078034434,0.001808341,0.0004196888,0.000016294995,0.0003539527,0.012290332],"genre_scores_gemma":[0.9982495,0.0000683901,0.0009547172,0.00032628432,0.00012348234,0.00008319542,0.00006156015,0.00005716959,0.00007574945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845743,0.000046297228,0.00043050208,0.00033644793,0.00028261536,0.0004466767],"domain_scores_gemma":[0.9993691,0.00011862701,0.00007504596,0.00030867578,0.000035604524,0.00009293893],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020978649,0.00028609077,0.0003812868,0.00027918472,0.000023158165,0.0000207302,0.00023702471,0.0001904009,0.00005919779],"category_scores_gemma":[0.000088213535,0.00027849167,0.000048473867,0.0005232582,0.000055833014,0.00012075138,0.00008918657,0.00026478604,0.00000954332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002041025,0.0005573571,0.058029782,0.0004117181,0.00032775346,0.0000688768,0.0026305413,0.7590339,0.019899711,0.15217473,0.0063815503,0.00027995426],"study_design_scores_gemma":[0.0070402515,0.0006346883,0.2850246,0.0015698071,0.000094143135,0.000011224501,0.0011511887,0.3472456,0.26292533,0.027371917,0.06437714,0.0025541023],"about_ca_topic_score_codex":0.00036494154,"about_ca_topic_score_gemma":0.0013040712,"teacher_disagreement_score":0.4117883,"about_ca_system_score_codex":0.00020367578,"about_ca_system_score_gemma":0.000038302056,"threshold_uncertainty_score":0.99996674},"labels":[],"label_agreement":null},{"id":"W2075816587","doi":"10.3182/20140824-6-za-1003.00630","title":"Collective Target Tracking Mean Field Control for Markovian Jump-Driven Models of Electric Water Heating Loads","year":2014,"lang":"en","type":"article","venue":"IFAC Proceedings Volumes","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Control theory (sociology); Electric power system; Markov process; Jump; Computer science; Simulation; Engineering; Power (physics); Control (management); Mathematics; Physics","score_opus":0.007557996473183162,"score_gpt":0.19143137049267786,"score_spread":0.1838733740194947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075816587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5706523,0.00015165954,0.40543586,0.0002555689,0.00053398486,0.0010734758,0.000010611759,0.0006390383,0.021247486],"genre_scores_gemma":[0.99271405,0.000007702404,0.0061596627,0.00011841322,0.00028454253,0.00020838338,0.000005778246,0.00007686925,0.0004245831],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984865,0.000008692469,0.00039010614,0.0003141394,0.00022875959,0.0005718133],"domain_scores_gemma":[0.9993977,0.00011142919,0.00007157497,0.000117285235,0.00022117545,0.000080865444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002978622,0.00026378207,0.00041455912,0.00025055802,0.000122062775,0.00007270624,0.00024762566,0.0001221507,0.000027295968],"category_scores_gemma":[0.00009904591,0.00024405183,0.00013497582,0.00023607016,0.000019989742,0.00036762247,0.00004054356,0.00015430324,0.0000044478434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025540264,0.0001083943,0.01880782,0.00139854,0.00086569926,0.000001476806,0.0068440367,0.8249696,0.11475711,0.005543096,0.014738329,0.011710514],"study_design_scores_gemma":[0.00083067076,0.00020438289,0.0002902186,0.00005413162,0.000059331687,0.0000015688418,0.00013485603,0.8491893,0.14426768,0.00347209,0.0012179628,0.0002778022],"about_ca_topic_score_codex":0.000042595904,"about_ca_topic_score_gemma":0.00001041323,"teacher_disagreement_score":0.42206174,"about_ca_system_score_codex":0.00018644452,"about_ca_system_score_gemma":0.000017946391,"threshold_uncertainty_score":0.99521446},"labels":[],"label_agreement":null},{"id":"W2076169396","doi":"10.1109/pesgm.2012.6345244","title":"BC Hydro approach to load modeling in state estimation","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Observability; Estimator; Energy management system; Robustness (evolution); Computer science; Electric power system; Sensitivity (control systems); Load management; Control theory (sociology); Reliability engineering; Real-time computing; Engineering; Energy management; Power (physics); Energy (signal processing); Electronic engineering; Control (management); Electrical engineering","score_opus":0.023170022960666833,"score_gpt":0.21038521705708813,"score_spread":0.1872151940964213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076169396","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21807767,0.000027113956,0.69177413,0.000014398839,0.00015415378,0.00007884687,1.7072894e-7,0.00018686807,0.089686625],"genre_scores_gemma":[0.9604409,0.0000040478167,0.039099764,0.000042458683,0.00003552898,0.000036133493,0.0000037348163,0.00001803849,0.0003194401],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944633,0.0000054741226,0.00012143552,0.00007693342,0.000116131756,0.00023370492],"domain_scores_gemma":[0.9997904,0.000004914773,0.0000038687745,0.00013241384,0.0000067153856,0.00006172438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016852126,0.000077340366,0.00006755527,0.00008812561,0.000009367606,0.000013989313,0.0000614473,0.000018408027,0.000015669659],"category_scores_gemma":[0.0000072580438,0.00007829683,0.000011646279,0.00014896246,0.0000016725182,0.00019678424,0.000031623527,0.000045555113,0.00016643363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.577506e-7,0.000015641423,0.00016945429,0.000015950136,0.0000054425172,1.3308943e-7,0.00032194983,0.99565256,0.000055457644,0.00054699136,0.0005373251,0.0026781422],"study_design_scores_gemma":[0.000083083425,0.0000020573852,0.0003118974,0.000004660882,0.000002033652,2.7010537e-7,0.0000305108,0.9982997,0.00031974574,0.00007150884,0.0007736752,0.000100846984],"about_ca_topic_score_codex":0.00016906709,"about_ca_topic_score_gemma":0.000024297982,"teacher_disagreement_score":0.74236315,"about_ca_system_score_codex":0.00015042008,"about_ca_system_score_gemma":0.0000025335069,"threshold_uncertainty_score":0.31928518},"labels":[],"label_agreement":null},{"id":"W2077247685","doi":"10.1109/energytech.2013.6645329","title":"Modeling, optimal selection and scheduling of interruptible loads in smart distribution systems","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Computer science; Procurement; Scheduling (production processes); Demand response; Context (archaeology); Payment; Grid; Incentive; Operations research; Mathematical optimization; Reliability engineering; Electricity; Engineering; Electrical engineering; Business","score_opus":0.00879355523304534,"score_gpt":0.19461659387434807,"score_spread":0.18582303864130273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077247685","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6505356,0.00008099829,0.348398,0.000008567644,0.00014028224,0.00008361574,5.2553e-7,0.00008011436,0.0006723006],"genre_scores_gemma":[0.99831766,0.000029207033,0.0015083908,0.0000021749074,0.000029816063,0.00003118422,0.000011410025,0.000010861912,0.000059291087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995023,0.000008997751,0.00019338632,0.000095013565,0.000067812536,0.00013247307],"domain_scores_gemma":[0.99985814,0.0000059279496,0.000010841494,0.00006870899,0.000029140248,0.000027252094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000094412106,0.00007681757,0.00010337208,0.00008191782,0.000011280547,0.000028861323,0.000039281487,0.00004182922,0.000023338864],"category_scores_gemma":[0.0000067584915,0.00007722035,0.000012999205,0.00013299512,0.000005964998,0.00018334902,0.000027149703,0.000062873885,0.000009425839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013627778,0.0000070557576,0.0019891295,0.00006136197,0.000012801005,1.4052897e-7,0.00002559836,0.99520975,0.0015562186,0.000824679,0.00009972963,0.00021215304],"study_design_scores_gemma":[0.0001410823,0.000017624272,0.0009858592,0.000040457715,0.000004151464,0.000001718066,0.00014002483,0.9973956,0.0011158311,0.000011334652,0.000070014314,0.00007631944],"about_ca_topic_score_codex":0.0015002646,"about_ca_topic_score_gemma":0.00008753326,"teacher_disagreement_score":0.34778208,"about_ca_system_score_codex":0.00007512205,"about_ca_system_score_gemma":0.0000028018744,"threshold_uncertainty_score":0.31489545},"labels":[],"label_agreement":null},{"id":"W2078008301","doi":"10.1109/allerton.2012.6483369","title":"Integrating Demand Response into agent-based models of electricity markets","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Electricity market; Reinforcement learning; Electricity; Computer science; Profit (economics); Flexibility (engineering); Offset (computer science); Microeconomics; Industrial organization; Operations research; Business; Economics; Artificial intelligence; Engineering","score_opus":0.01198410563442517,"score_gpt":0.21281181506671976,"score_spread":0.20082770943229458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078008301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54337615,0.0002011024,0.4434824,0.000024655385,0.00017889489,0.000072979434,4.8792054e-7,0.00018901794,0.012474302],"genre_scores_gemma":[0.98662233,0.000010172044,0.013016261,0.00006001555,0.00004629429,0.00001762335,0.000002431398,0.000025356898,0.00019951783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919283,0.000077406316,0.00021344963,0.000089956186,0.00015305838,0.00027330412],"domain_scores_gemma":[0.99949616,0.00015261407,0.000024753355,0.00022585751,0.000024785062,0.0000758553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007140083,0.0001258264,0.0001370529,0.00015484355,0.000026068632,0.000009786561,0.0001185793,0.000046634068,0.00009792376],"category_scores_gemma":[0.00007017674,0.000114636794,0.000049947,0.00023106982,0.000013677984,0.00018039884,0.00003238975,0.00007982359,0.000012841217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019679496,0.00006398709,0.0020083531,0.00010463342,0.00008041257,0.0000019310137,0.00031760926,0.9577701,0.026576333,0.0034215653,0.0063952263,0.0030630308],"study_design_scores_gemma":[0.00022835644,0.000021038473,0.004363582,0.000017973225,0.000015843802,5.184596e-7,0.000046341505,0.91542804,0.077900514,0.00014259621,0.0016846427,0.00015052393],"about_ca_topic_score_codex":0.00004098871,"about_ca_topic_score_gemma":0.000014821493,"teacher_disagreement_score":0.4432462,"about_ca_system_score_codex":0.00010584466,"about_ca_system_score_gemma":0.000009619363,"threshold_uncertainty_score":0.4674753},"labels":[],"label_agreement":null},{"id":"W2080276913","doi":"10.1109/smartgridcomm.2012.6485969","title":"Distributed control for reducing carbon footprint in the residential sector","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Carbon footprint; Provisioning; Computer science; Duration (music); Power (physics); Control (management); Automotive engineering; Reduction (mathematics); Footprint; Grid; Real-time computing; Environmental economics; Computer network; Engineering; Greenhouse gas","score_opus":0.011614200123997685,"score_gpt":0.2069149266279717,"score_spread":0.195300726503974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080276913","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8973877,0.0001795601,0.088195,0.00044593774,0.0017268539,0.0006405498,0.000009342852,0.0002812297,0.011133821],"genre_scores_gemma":[0.9989564,0.0000029097953,0.00023007503,0.000031637614,0.00055259524,0.00015538973,0.000009064113,0.00001715738,0.000044780576],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936724,0.000022343009,0.0001430577,0.00007704085,0.000095909134,0.00029440908],"domain_scores_gemma":[0.9996717,0.00008321324,0.000010913888,0.00019598784,0.000008677149,0.000029485667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032782674,0.0000862635,0.000089745736,0.000044884266,0.00002086051,0.000022641028,0.00012555844,0.000031459815,0.000012286582],"category_scores_gemma":[0.00003087643,0.00006475045,0.000037015143,0.00009691047,0.0000071086374,0.000029081031,0.00001681378,0.000064415166,0.0000023441078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005426834,0.000094464536,0.012044797,0.00013261079,0.00018330543,0.000004396193,0.0010374875,0.94752157,0.009778877,0.0188618,0.008508743,0.0017777042],"study_design_scores_gemma":[0.004699627,0.000091820206,0.35570297,0.000059140628,0.00015551763,0.000008881959,0.001076962,0.5297905,0.03199135,0.00051923515,0.075028725,0.0008752914],"about_ca_topic_score_codex":0.0002509557,"about_ca_topic_score_gemma":0.00016622081,"teacher_disagreement_score":0.41773105,"about_ca_system_score_codex":0.00007676447,"about_ca_system_score_gemma":0.0000027890285,"threshold_uncertainty_score":0.26404467},"labels":[],"label_agreement":null},{"id":"W2080349679","doi":"10.5539/eer.v3n2p139","title":"Economic Value Approach to Intermittent Power Generation in the Nordic Power Markets","year":2013,"lang":"en","type":"article","venue":"Energy and Environment Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"European Association of Environmental and Resource Economists; Yrjö Jahnssonin Säätiö","keywords":"Dispatchable generation; Electricity generation; Renewable energy; Cost of electricity by source; Electricity; Production (economics); Electricity market; Environmental economics; Demand response; Economics; Electricity retailing; Wind power; Fossil fuel; Value (mathematics); Microeconomics; Natural resource economics; Power (physics); Computer science","score_opus":0.018725988088020135,"score_gpt":0.2216664699903848,"score_spread":0.20294048190236466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080349679","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9224393,0.000258702,0.0029814898,0.0008110812,0.00013847709,0.00028342116,0.0000010584337,0.000026319338,0.07306018],"genre_scores_gemma":[0.9974154,0.0003983116,0.00027431067,0.00018828656,0.00010051954,0.0004648527,0.000012418686,0.000023902192,0.0011219793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987273,0.00016395141,0.00016959883,0.00027864327,0.00027392776,0.00038656188],"domain_scores_gemma":[0.9995475,0.000038646005,0.000007801847,0.00031465164,0.0000033854692,0.000088041284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070916995,0.00013464161,0.00010079891,0.00019064677,0.000084362684,0.000097796,0.00025343185,0.00005760664,0.0004752722],"category_scores_gemma":[0.000005634417,0.000105659645,0.000026282818,0.00008282434,0.000054765485,0.00012647586,0.00018341385,0.0001622334,0.0002180835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009937589,0.00011826482,0.00067860226,0.000010796201,0.00005358442,0.000006817516,0.0008452205,0.90339327,0.0020162505,0.014224863,0.06617332,0.012469078],"study_design_scores_gemma":[0.0005416682,0.00015757422,0.29876316,0.000013954225,0.0000064139813,0.00000977519,0.0008857653,0.25322828,0.0010465394,0.0005211819,0.4443483,0.00047738853],"about_ca_topic_score_codex":0.00027130105,"about_ca_topic_score_gemma":0.00002750464,"teacher_disagreement_score":0.65016496,"about_ca_system_score_codex":0.00021847688,"about_ca_system_score_gemma":0.000004087539,"threshold_uncertainty_score":0.52038974},"labels":[],"label_agreement":null},{"id":"W2081324415","doi":"10.1080/00139157.2014.964092","title":"Building-Integrated Photovoltaics: Distributed Energy Development for Urban Sustainability","year":2014,"lang":"en","type":"article","venue":"Environment Science and Policy for Sustainable Development","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Concordia University; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Photovoltaics; Sustainability; Environmental science; Distributed generation; Photovoltaic system; Architectural engineering; Environmental economics; Business; Environmental planning; Renewable energy; Engineering; Electrical engineering; Economics; Ecology","score_opus":0.004861188504335193,"score_gpt":0.2067596618361659,"score_spread":0.2018984733318307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081324415","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12558228,0.0000995944,0.8712759,0.00039202222,0.0001752448,0.001503268,0.000013564933,0.00028992584,0.00066819164],"genre_scores_gemma":[0.95088357,0.00003359803,0.042667862,0.0003187255,0.00018442044,0.0024877293,0.0001288964,0.00007396727,0.003221227],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967607,0.000020423391,0.0005121327,0.00068772765,0.00052527944,0.0014937315],"domain_scores_gemma":[0.9988229,0.000110727124,0.00007735015,0.00039973183,0.00024091399,0.00034833667],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017206537,0.00041742943,0.00031958424,0.0005197127,0.0009742848,0.0002006718,0.0004940848,0.00009346645,0.00001032476],"category_scores_gemma":[0.0004409849,0.00041000443,0.000055347442,0.0006461468,0.0003469367,0.00037560845,0.00029329065,0.00008198203,0.0000028630138],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021727789,0.00050196925,0.0021940563,0.0027705643,0.00039607615,0.000015718362,0.004912323,0.19524306,0.0034897497,0.5706188,0.033615366,0.18602504],"study_design_scores_gemma":[0.00066496065,0.00007879144,0.0025744268,0.000012743619,0.000013394798,0.0000012891309,0.0008770571,0.027280454,0.033677008,0.0032993776,0.93099725,0.0005232371],"about_ca_topic_score_codex":0.00009093914,"about_ca_topic_score_gemma":0.000009872357,"teacher_disagreement_score":0.8973819,"about_ca_system_score_codex":0.004295734,"about_ca_system_score_gemma":0.00081331306,"threshold_uncertainty_score":0.9998352},"labels":[],"label_agreement":null},{"id":"W2081666512","doi":"10.1109/pesmg.2013.6672552","title":"Demand response potential of water heaters to mitigate minimum generation conditions","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Demand response; Electricity; Renewable energy; Electricity generation; Greenhouse gas; Base load power plant; Work (physics); Environmental science; Water heating; Greenhouse; Environmental economics; Computer science; Automotive engineering; Engineering; Power (physics); Economics; Waste management; Electrical engineering; Distributed generation; Mechanical engineering","score_opus":0.006626892304529815,"score_gpt":0.18935528981471528,"score_spread":0.18272839751018546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081666512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96859646,0.0000043870964,0.028679898,0.0008157393,0.0004299021,0.0001800896,0.0000036088138,0.00011423982,0.0011756633],"genre_scores_gemma":[0.9970283,0.0000018936967,0.0010338331,0.0001734099,0.00008376295,0.00007347022,0.00003000769,0.000017008739,0.0015583093],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994544,0.000026218273,0.00016433145,0.00009838881,0.00009045417,0.00016625173],"domain_scores_gemma":[0.99972606,0.000008523002,0.0000055383093,0.00016059242,0.00003197119,0.00006729143],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008823734,0.000082757855,0.00008167301,0.0001161707,0.000028618833,0.000026786014,0.000061104685,0.000029041345,0.0009884337],"category_scores_gemma":[0.0000043493187,0.00006650256,0.000030864394,0.000052949217,0.00001382834,0.000116118434,0.00002882878,0.000023359518,0.0004420216],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005485185,0.0000044113467,0.00001670263,0.000005144707,0.000021410613,0.0000011743812,0.00006267745,0.41834554,0.5519734,0.000038564744,0.029496353,0.000029123352],"study_design_scores_gemma":[0.0002620647,0.000047405185,0.008530904,0.0000064540595,0.000016790997,0.0000020726488,0.000055283683,0.18450806,0.8034227,0.000051364845,0.0029425912,0.00015431186],"about_ca_topic_score_codex":0.000040213687,"about_ca_topic_score_gemma":0.000011038042,"teacher_disagreement_score":0.2514493,"about_ca_system_score_codex":0.00002642751,"about_ca_system_score_gemma":0.0000022569307,"threshold_uncertainty_score":0.9999248},"labels":[],"label_agreement":null},{"id":"W2084067034","doi":"10.1109/tsg.2014.2331175","title":"A Monte Carlo Simulation Platform for Studying Low Voltage Residential Networks","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Monte Carlo method; Smart grid; Demand response; Computer science; Simulation; Voltage; Grid; Engineering; Reliability engineering; Electricity; Electrical engineering","score_opus":0.016092344985819594,"score_gpt":0.2235146231287392,"score_spread":0.2074222781429196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084067034","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06915292,0.00002187826,0.92304546,0.000021151769,0.0063706203,0.00049389317,0.000018748164,0.0005892886,0.00028606594],"genre_scores_gemma":[0.99773926,0.000022602877,0.00051536964,0.00008002966,0.00094952574,0.0002535207,0.0000061906185,0.000092043905,0.0003414348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986555,0.000019260615,0.00035462706,0.00030307478,0.00024955385,0.00041799428],"domain_scores_gemma":[0.99916154,0.00023784088,0.000040843675,0.000402529,0.0000539516,0.00010326723],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002606785,0.0002683409,0.00024377748,0.00022142362,0.00026116302,0.000082292274,0.0001720094,0.00012394645,0.000037609625],"category_scores_gemma":[0.0000060049597,0.0002969289,0.0001799301,0.00022651436,0.000029337498,0.0002899562,0.0000020154457,0.00023625117,0.000035186207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058658152,0.000043458298,0.000021667935,0.000049177044,0.00011970127,0.0000014597072,0.000095544594,0.9886916,0.00010301329,0.000020287356,0.0015102671,0.009285132],"study_design_scores_gemma":[0.0009174172,0.000104480714,0.00038135174,0.000043639804,0.000090947855,0.0000010007642,0.000034149714,0.9856391,0.0016772461,0.000016240763,0.010792542,0.0003018976],"about_ca_topic_score_codex":0.000053026462,"about_ca_topic_score_gemma":0.000318215,"teacher_disagreement_score":0.92858636,"about_ca_system_score_codex":0.00015202718,"about_ca_system_score_gemma":0.0000075270705,"threshold_uncertainty_score":0.99994826},"labels":[],"label_agreement":null},{"id":"W2084849953","doi":"10.1109/iembs.2011.6091313","title":"Usage monitoring of electrical devices in a smart home","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electrical load; Computer science; Signature (topology); Mahalanobis distance; Power consumption; Electrical equipment; Home automation; Electric power; Key (lock); Real-time computing; Waveform; Electrical engineering; Power (physics); Voltage; Artificial intelligence; Engineering; Telecommunications; Computer security","score_opus":0.021216463346834614,"score_gpt":0.2027843280785779,"score_spread":0.1815678647317433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084849953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9361864,0.00012833424,0.0016510342,0.000002654926,0.00028161547,0.00004334568,1.2844811e-7,0.00013800897,0.0615685],"genre_scores_gemma":[0.9963421,0.000031222695,0.0034374995,0.0000045923125,0.000038969196,0.000011061871,2.4181494e-7,0.000013162937,0.000121106226],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99952084,0.0000071972295,0.00014764554,0.00007757082,0.00008309636,0.00016364167],"domain_scores_gemma":[0.99981666,0.00001590069,0.000009113439,0.00012421564,0.000006806589,0.000027317508],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007814983,0.000069868045,0.000101235215,0.00013943463,0.0000051871243,0.0000038421535,0.00010896964,0.000028910632,0.000074603944],"category_scores_gemma":[0.0000045454362,0.00006756471,0.000021139565,0.00024117924,0.000006637067,0.000075511336,0.000026688933,0.000057666562,0.000026197229],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007705619,0.000057431072,0.9792751,0.000066904955,0.0000521143,0.000020432162,0.00038702224,0.010563319,0.0019288945,0.0028369918,0.0002499742,0.0045540757],"study_design_scores_gemma":[0.0001909086,0.000027292477,0.9568505,0.000020446823,0.0000066408275,7.750027e-7,0.000052205534,0.01197459,0.029538952,0.00010256873,0.0010967706,0.00013829158],"about_ca_topic_score_codex":0.00015452194,"about_ca_topic_score_gemma":0.00005612636,"teacher_disagreement_score":0.061447393,"about_ca_system_score_codex":0.00003513155,"about_ca_system_score_gemma":0.0000024716808,"threshold_uncertainty_score":0.2755209},"labels":[],"label_agreement":null},{"id":"W2085018292","doi":"10.1016/j.energy.2014.01.099","title":"An inexact two-stage stochastic robust programming for residential micro-grid management-based on random demand","year":2014,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"China Scholarship Council","keywords":"Robustness (evolution); Stochastic programming; Robust optimization; Grid; Mathematical optimization; Demand response; Computer science; Linear programming; Smart grid; Stochastic optimization; Investment (military); Interval (graph theory); Electricity; Reliability engineering; Operations research; Engineering; Mathematics; Electrical engineering","score_opus":0.007618417349255408,"score_gpt":0.21325967829193218,"score_spread":0.20564126094267676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085018292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007852879,0.000044437053,0.9868036,0.00003785184,0.0012930472,0.00032048207,0.0000068982436,0.000564242,0.0030765685],"genre_scores_gemma":[0.9773937,0.0000060397815,0.019689163,0.00020975046,0.0011395282,0.0004628278,0.0001932327,0.0001399189,0.0007658688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984405,0.00006563831,0.00030376736,0.0004066942,0.00025744896,0.0005259763],"domain_scores_gemma":[0.9990925,0.000120598015,0.000055059685,0.0005682887,0.000028227641,0.00013530304],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003691317,0.00031245203,0.0002726926,0.00029579442,0.00012984064,0.00014007153,0.00032300822,0.000067884255,0.00003639624],"category_scores_gemma":[0.000023244838,0.00032507736,0.00011731729,0.00018842708,0.000030297331,0.0001324698,0.00004054876,0.00008816368,0.00000983481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016976953,0.000059440274,0.0000132681225,0.000099845674,0.000094076495,0.000008934004,0.0000145539925,0.9837168,0.0006268107,0.0048635337,0.0021697537,0.008163222],"study_design_scores_gemma":[0.0048612473,0.00016445515,0.00008980836,0.000057047368,0.00008136541,6.813051e-7,0.00002205029,0.9328076,0.0030002613,0.000059199032,0.05846904,0.00038724745],"about_ca_topic_score_codex":0.00006864166,"about_ca_topic_score_gemma":0.00021718029,"teacher_disagreement_score":0.9695408,"about_ca_system_score_codex":0.00009370999,"about_ca_system_score_gemma":0.000007031882,"threshold_uncertainty_score":0.9999201},"labels":[],"label_agreement":null},{"id":"W2086749039","doi":"10.1145/2602044.2602076","title":"Predicting peak-demand days in the ontario peak reduction program for large consumers","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Peak demand; Leverage (statistics); Peak load; Context (archaeology); Heuristic; Reduction (mathematics); Electricity; Computer science; Demand reduction; Econometrics; Simulation; Economics; Mathematics; Engineering; Electrical engineering; Geography; Automotive engineering; Machine learning; Medicine; Artificial intelligence","score_opus":0.00928485334803083,"score_gpt":0.2147474638159696,"score_spread":0.20546261046793876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086749039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8685251,0.000049465194,0.033082515,0.00028593314,0.0015367523,0.0013708638,0.0000022117697,0.00086236134,0.094284795],"genre_scores_gemma":[0.9962987,0.00000536859,0.0022731912,0.000042340787,0.00017368462,0.00034678457,0.00002514906,0.000023202767,0.0008115794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992518,0.000025525835,0.00017248129,0.00015028771,0.00011711711,0.00028282165],"domain_scores_gemma":[0.99967545,0.00004712344,0.000018641469,0.00021692914,0.000014785968,0.000027063435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057606195,0.00011107578,0.00009898435,0.00006225163,0.00006825249,0.000050092098,0.0001365537,0.0000427187,0.000041650153],"category_scores_gemma":[0.000026670903,0.000086635344,0.000039940092,0.000102711485,0.000011800421,0.00009778407,0.00002493923,0.00011457255,0.00000846574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080002355,0.0006604411,0.13575494,0.0007357302,0.00052346074,0.000007501461,0.021401167,0.6470021,0.0009321768,0.050047595,0.08666488,0.056190018],"study_design_scores_gemma":[0.0011862557,0.000120638055,0.059860837,0.000032488828,0.000052109073,0.0000072671705,0.0012581203,0.37712926,0.0003054684,0.00020908643,0.5595733,0.00026520994],"about_ca_topic_score_codex":0.0014900434,"about_ca_topic_score_gemma":0.0338641,"teacher_disagreement_score":0.4729084,"about_ca_system_score_codex":0.00010475682,"about_ca_system_score_gemma":0.0000066314788,"threshold_uncertainty_score":0.98376536},"labels":[],"label_agreement":null},{"id":"W2088685155","doi":"10.1016/j.wasman.2008.07.008","title":"Status and prospects of pay-as-you-throw in Europe – A review of pilot research and implementation studies","year":2008,"lang":"en","type":"review","venue":"Waste Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intecsea (Canada)","funders":"","keywords":"Incentive; Situational ethics; Meaning (existential); Order (exchange); Scale (ratio); Engineering; Environmental economics; Business; Political science; Economics; Finance; Law; Psychology; Geography","score_opus":0.10576770145747239,"score_gpt":0.39374731842400795,"score_spread":0.28797961696653557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2088685155","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011201853,0.9919997,0.000007296691,0.000028759392,0.00015929223,0.0025910202,0.000013661308,0.000035579695,0.0050527044],"genre_scores_gemma":[0.00011340548,0.99861836,0.00026430463,0.000014356151,0.00004064822,0.00046361715,0.000043203778,0.00007199125,0.00037008844],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.99735165,0.00017997781,0.0010143323,0.00044639767,0.0005603329,0.0004473239],"domain_scores_gemma":[0.99900746,0.00009143852,0.00020126754,0.0004915187,0.00014342798,0.0000648659],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000826629,0.00037253008,0.0013833427,0.0007362682,0.00003958691,0.000016444026,0.00020640624,0.00003782227,0.000017072547],"category_scores_gemma":[0.000042056265,0.00030238333,0.000055837198,0.0012998576,0.00014799167,0.00008509072,0.00074589765,0.00023628595,0.0000068649297],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043634004,0.00005824205,0.0000348854,0.4987331,0.00070094975,0.00005299036,0.00015885946,0.00007124312,3.3748898e-7,0.0042837868,0.0054732542,0.490428],"study_design_scores_gemma":[0.000435631,0.00031529722,0.00011044826,0.07240222,0.00027152238,0.000005116153,0.00042050288,0.000014431357,0.0000041561652,0.00006714453,0.92568475,0.00026876858],"about_ca_topic_score_codex":0.000059048518,"about_ca_topic_score_gemma":0.00005558928,"teacher_disagreement_score":0.9202115,"about_ca_system_score_codex":0.0001975455,"about_ca_system_score_gemma":0.00002802746,"threshold_uncertainty_score":0.99994284},"labels":[],"label_agreement":null},{"id":"W2091120919","doi":"10.1109/tsg.2012.2224677","title":"Optimizations of Power Consumption and Supply in the Smart Grid: Analysis of the Impact of Data Communication Reliability","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Unavailability; Smart grid; Computer science; Markov decision process; Scheduling (production processes); Economic dispatch; Software deployment; Reliability engineering; Demand response; Redundancy (engineering); Grid; Reliability (semiconductor); Distributed computing; Markov process; Electric power system; Electricity; Power (physics); Engineering","score_opus":0.021991425731879947,"score_gpt":0.2599237253055856,"score_spread":0.23793229957370565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091120919","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93883735,0.00007692882,0.059190128,0.0002368174,0.000270978,0.0005161245,0.0005157169,0.00003283459,0.00032314987],"genre_scores_gemma":[0.99857026,0.0003844859,0.0008747759,0.000012589995,0.000006567182,0.000051778392,0.00007637226,0.000012862352,0.000010326882],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99882656,0.00018120403,0.00048431585,0.00016932526,0.00021068008,0.00012789281],"domain_scores_gemma":[0.99772036,0.00030114004,0.00010667049,0.0017575459,0.00008680605,0.000027490023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047539987,0.00013529809,0.00027037325,0.0002978999,0.00006695667,0.00001608727,0.00056253996,0.000062030005,0.00021963312],"category_scores_gemma":[0.00001450969,0.000092760085,0.0001447489,0.0009803856,0.0001781995,0.00030727842,0.000012310522,0.00018396619,0.0000027468154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009956814,0.00015756121,0.018620998,0.000029073499,0.0003951447,4.447519e-8,0.0003613055,0.97877955,0.00041135444,0.000019577234,0.00093157304,0.000283863],"study_design_scores_gemma":[0.0002874599,0.000040422405,0.62047005,0.000035225552,0.00044117408,8.623861e-7,0.00015221717,0.3771373,0.0012054376,0.000019319607,0.00010981803,0.000100730715],"about_ca_topic_score_codex":0.0024288704,"about_ca_topic_score_gemma":0.0009743131,"teacher_disagreement_score":0.601849,"about_ca_system_score_codex":0.000058943086,"about_ca_system_score_gemma":0.00001769643,"threshold_uncertainty_score":0.37826467},"labels":[],"label_agreement":null},{"id":"W2091123125","doi":"10.1109/jsac.2014.2332011","title":"Guest Editorial for the Special Series on Smart Grid Communications","year":2014,"lang":"en","type":"editorial","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Computer science; Special section; Demand response; Grid; Telecommunications; Energy management; Load management; Range (aeronautics); Distributed computing; Computer security; Electrical engineering; Electricity; Energy (signal processing); Engineering","score_opus":0.018704461401902,"score_gpt":0.2691460952647464,"score_spread":0.2504416338628444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091123125","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010987597,0.00045259733,0.00043640097,0.002696598,0.9869401,0.0006820623,0.000308931,0.000253717,0.008218591],"genre_scores_gemma":[0.0005465342,0.010406799,0.000918403,0.000079578895,0.98582,0.00066328584,0.0009909451,0.00019459857,0.00037983473],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963983,0.00059119705,0.0011063253,0.00030314922,0.0010076223,0.0005933623],"domain_scores_gemma":[0.9845081,0.008686763,0.0004169324,0.005264091,0.00096815126,0.00015599128],"candidate_categories":["metaepi_narrow","open_science","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0013694458,0.0005963299,0.0006388802,0.000559901,0.0012998501,0.00042848522,0.006293201,0.0007627149,0.000020337],"category_scores_gemma":[0.0020416495,0.0005195413,0.0002660168,0.0007974472,0.00029082087,0.00021565285,0.00027964704,0.0050835633,0.00008849385],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010507565,0.00018334844,0.000005923084,0.000025281635,0.00030150282,9.90817e-7,0.00013075312,0.02352575,0.000009841385,0.0008104936,0.97452027,0.0003807582],"study_design_scores_gemma":[0.0009406422,0.00023843952,0.00006168936,0.0003619268,0.00016300636,0.000006516777,0.00004345969,0.0033828064,0.000029427545,0.00029194323,0.99398637,0.0004937652],"about_ca_topic_score_codex":0.000048797752,"about_ca_topic_score_gemma":0.0026715575,"teacher_disagreement_score":0.020142945,"about_ca_system_score_codex":0.001025194,"about_ca_system_score_gemma":0.00033257902,"threshold_uncertainty_score":0.99975276},"labels":[],"label_agreement":null},{"id":"W2091733411","doi":"10.5540/03.2013.001.01.0202","title":"Proposta de algoritmo para gerenciamento pelo lado demanda em residências através do corte de smart plugs","year":2013,"lang":"pt","type":"article","venue":"Proceeding Series of the Brazilian Society of Computational and Applied Mathematics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"The Audio Recording Academy","funders":"","keywords":"Humanities; Physics; Computer science; Art","score_opus":0.01177452349026389,"score_gpt":0.2155931663208448,"score_spread":0.2038186428305809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091733411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92497337,0.000412513,0.0698622,0.0013601397,0.00017351886,0.0013004786,0.00004089759,0.00013906011,0.0017378449],"genre_scores_gemma":[0.7493785,0.00015517347,0.24931517,0.00012391094,0.00013113362,0.00008870064,0.000012303203,0.00007157724,0.0007235088],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792975,0.000013359985,0.0007382461,0.00028162345,0.0005810611,0.0004559729],"domain_scores_gemma":[0.99877304,0.00021676395,0.00043921292,0.00021004425,0.00023054215,0.000130395],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051182386,0.00037751033,0.00051962386,0.00004583883,0.00028624132,0.00014856317,0.00044147827,0.00015568837,0.00006522936],"category_scores_gemma":[0.000035738034,0.0003379898,0.00022199136,0.0002570029,0.00030380618,0.00020326168,0.00031059634,0.00027955082,0.000009309162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000117688745,0.0010569146,0.009154674,0.045116365,0.003912248,0.0000014436598,0.17956354,0.42360386,0.017524825,0.22612849,0.08558933,0.008230635],"study_design_scores_gemma":[0.0019187378,0.00019598994,0.043576475,0.0020247228,0.00068149326,0.000049360035,0.06687602,0.48012438,0.017831527,0.38463607,0.00076175266,0.0013234636],"about_ca_topic_score_codex":0.00001881228,"about_ca_topic_score_gemma":0.0000034173756,"teacher_disagreement_score":0.17945297,"about_ca_system_score_codex":0.00013436809,"about_ca_system_score_gemma":0.00015145527,"threshold_uncertainty_score":0.9999072},"labels":[],"label_agreement":null},{"id":"W2093828799","doi":"10.1109/tsg.2014.2376291","title":"Nonparametric Demand Forecasting and Detection of Energy Aware Consumers","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Nonparametric statistics; Demand response; Computer science; Demand forecasting; Econometrics; Tariff; Smart grid; Economics; Demand management; Electricity; Mathematical optimization; Operations research; Engineering; Mathematics","score_opus":0.011069574317226136,"score_gpt":0.18439256141545818,"score_spread":0.17332298709823205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093828799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16665109,0.000057249174,0.8303852,0.000010516246,0.0016934763,0.00006467873,0.000008139424,0.00017777084,0.0009518883],"genre_scores_gemma":[0.9992057,0.00012861578,0.0004178373,0.000027798209,0.00007527242,0.00003863967,0.0000020239154,0.0000373177,0.00006676083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991454,0.000035587826,0.00024927317,0.00019639448,0.00015947067,0.00021386518],"domain_scores_gemma":[0.9994664,0.00016832045,0.000038944323,0.00021064992,0.00003412588,0.000081533224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001448509,0.00017345492,0.00020034662,0.00040179014,0.000100408906,0.000018834242,0.00007222061,0.000080149824,0.000020856694],"category_scores_gemma":[0.000005711218,0.00018716833,0.000068172325,0.00041916055,0.000051318497,0.000107697335,0.0000013649,0.00012772792,0.000006952654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026406075,0.000041864958,0.00019878743,0.00011897388,0.0001551291,0.0000019323536,0.000046481822,0.86778504,0.004216944,0.00003139952,0.0001493551,0.12722766],"study_design_scores_gemma":[0.00062115374,0.00015185647,0.00082451914,0.000047667774,0.000101003934,0.000018339355,0.00003336135,0.7833982,0.20554157,0.000032354325,0.008944474,0.0002854857],"about_ca_topic_score_codex":0.000111205045,"about_ca_topic_score_gemma":0.0002442372,"teacher_disagreement_score":0.83255464,"about_ca_system_score_codex":0.00005077232,"about_ca_system_score_gemma":0.000004680111,"threshold_uncertainty_score":0.76325035},"labels":[],"label_agreement":null},{"id":"W2093837586","doi":"10.1016/j.eneco.2012.04.009","title":"Transportation and storage under a dynamic price cap regulation process","year":2012,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Stylized fact; Economics; Microeconomics; Process (computing); Dynamic pricing; Sequential game; Price setting; Mechanism (biology); Welfare; Game theory; Computer science; Macroeconomics; Market economy","score_opus":0.004636631692598834,"score_gpt":0.1747152805954703,"score_spread":0.17007864890287147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093837586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9517474,0.00026251085,0.04456542,0.00003318558,0.00046067222,0.0000361791,0.0000034208167,0.00014136497,0.0027498046],"genre_scores_gemma":[0.99897355,0.00014944634,0.00034810096,0.000043718028,0.00010828659,0.00002356484,0.000051733423,0.000033985965,0.00026763053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995522,0.000005267427,0.000138192,0.0001036291,0.000027897073,0.00017284186],"domain_scores_gemma":[0.99978054,0.0000105369045,0.000028242053,0.000112867834,0.0000075192097,0.000060304475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059968417,0.00010279734,0.00008721143,0.00006455506,0.00002983737,0.000017183502,0.00004505783,0.000051126313,0.000029949462],"category_scores_gemma":[0.0000010268269,0.00012369856,0.000016801512,0.000048697424,0.000012008112,0.00034031464,0.0000039940755,0.000034502114,0.0000033305607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002851876,0.000009175305,0.001424183,0.000026196241,0.00003268746,1.5926031e-7,0.00024238837,0.98493004,0.00008921062,0.012137423,0.00008574307,0.0010199578],"study_design_scores_gemma":[0.00028461227,0.000008774565,0.11471804,0.000007865928,0.000025624287,0.0000021521923,0.00017204823,0.8643191,0.00072557654,0.0012898885,0.018152012,0.00029432584],"about_ca_topic_score_codex":0.000019103463,"about_ca_topic_score_gemma":0.00024481348,"teacher_disagreement_score":0.120610945,"about_ca_system_score_codex":0.00011714606,"about_ca_system_score_gemma":0.0000044345866,"threshold_uncertainty_score":0.5044281},"labels":[],"label_agreement":null},{"id":"W2095043632","doi":"10.1109/tvt.2014.2313604","title":"Green Cognitive Mobile Networks With Small Cells for Multimedia Communications in the Smart Grid Environment","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Vehicular Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Huawei Technologies (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Computer science; Stackelberg competition; Cognitive radio; Efficient energy use; Distributed computing; Computer network; Multimedia; Telecommunications; Engineering; Wireless; Electrical engineering","score_opus":0.010113145054258095,"score_gpt":0.19351910347798115,"score_spread":0.18340595842372306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095043632","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03157015,0.00010928911,0.96617806,0.00044530144,0.00021981893,0.00096604077,0.000018568906,0.00032120245,0.00017154418],"genre_scores_gemma":[0.9889546,0.00025002044,0.007415683,0.00013386787,0.000034500954,0.0031062933,0.00002094688,0.000046606663,0.00003748675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991228,0.00005858119,0.00019785076,0.00022581633,0.00009883807,0.0002960989],"domain_scores_gemma":[0.99887145,0.00025061888,0.000029906698,0.0007997165,0.000018952072,0.000029372512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019933295,0.0001930645,0.00017815066,0.00024570807,0.00013374414,0.000012950469,0.00049217726,0.00018507849,0.000010928483],"category_scores_gemma":[0.000001843274,0.00015890536,0.000061760256,0.00030041917,0.00019471509,0.0000360304,0.0000047702065,0.00043664928,0.000029573275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001351867,0.00014522011,0.0000237009,0.0000133664635,0.00009031136,0.0000025443123,0.00009527632,0.96486443,0.00031958323,0.00007351933,0.000047962287,0.034310587],"study_design_scores_gemma":[0.001348201,0.00042310296,0.00016707595,0.000052972704,0.00015146354,0.000010171326,0.00046578285,0.93779993,0.013987651,0.00006731145,0.04519859,0.00032773713],"about_ca_topic_score_codex":0.000037203543,"about_ca_topic_score_gemma":0.0005667482,"teacher_disagreement_score":0.9587624,"about_ca_system_score_codex":0.00007064573,"about_ca_system_score_gemma":0.000004433898,"threshold_uncertainty_score":0.64799726},"labels":[],"label_agreement":null},{"id":"W2100280406","doi":"10.1109/tpwrs.2007.901485","title":"Customer-Owned Back-Up Generators for Energy Management by Distribution Utilities","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Load management; Energy management; Electricity generation; Electricity market; Market penetration; Computer science; Distributed generation; Reciprocating motion; Automotive engineering; Operations research; Business; Environmental economics; Industrial organization; Engineering; Economics; Electrical engineering; Renewable energy; Energy (signal processing); Power (physics)","score_opus":0.0077145261126909965,"score_gpt":0.1983987373152646,"score_spread":0.19068421120257362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100280406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002374369,0.0002950667,0.978245,0.000019967616,0.0113764405,0.00041237206,0.00031570956,0.0004824678,0.0064785816],"genre_scores_gemma":[0.9914588,0.000108592096,0.00017158629,0.000043583823,0.000060539278,0.00033905936,0.00009523201,0.00007683146,0.0076457853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99836737,0.000026218038,0.00046055412,0.00031851282,0.0003030574,0.0005242938],"domain_scores_gemma":[0.99930125,0.000056716053,0.000043080203,0.0004106095,0.000053579843,0.0001347364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028255337,0.0003068743,0.0002464219,0.0002042166,0.00016272852,0.00007427246,0.00018200399,0.00013081962,0.00007339618],"category_scores_gemma":[7.416412e-7,0.00032327583,0.0001498085,0.00030576353,0.000033590037,0.00014620634,0.0000014868739,0.000098522854,0.00010515694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017572126,0.0002132124,0.0000074504337,0.0005622278,0.0010462914,0.000012685413,0.00025773392,0.7234243,0.0013789925,0.00797249,0.25758082,0.0073680505],"study_design_scores_gemma":[0.0009129591,0.00009051605,0.000027413484,0.00006465614,0.000091226415,0.000005699997,0.00052564853,0.024143225,0.04956751,0.000012009062,0.9240428,0.0005163079],"about_ca_topic_score_codex":0.00007658226,"about_ca_topic_score_gemma":0.000042360512,"teacher_disagreement_score":0.9890844,"about_ca_system_score_codex":0.00040306483,"about_ca_system_score_gemma":0.0000058787705,"threshold_uncertainty_score":0.9999219},"labels":[],"label_agreement":null},{"id":"W2101463878","doi":"10.1080/23744731.2015.1072455","title":"Demonstration of HVAC chiller control for power grid frequency regulation—Part 2: Discussion of results and considerations for broader deployment","year":2015,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Division of Emerging Frontiers in Research and Innovation; Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"HVAC; Chiller; Controller (irrigation); Frequency regulation; Grid; Automotive engineering; Automatic frequency control; Gas compressor; Engineering; Reliability engineering; Power (physics); Control engineering; Air conditioning; Computer science; Electric power system; Electrical engineering; Mechanical engineering","score_opus":0.016118337004329412,"score_gpt":0.2161259732201136,"score_spread":0.20000763621578418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101463878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4236076,0.0019040068,0.52453446,0.039930508,0.0013701882,0.007220268,0.0005093805,0.0002283307,0.0006952538],"genre_scores_gemma":[0.99358517,0.00004836864,0.005923134,0.000020771136,0.000020005025,0.00033716587,0.0000052055434,0.0000081116505,0.000052081024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99927986,0.0000044504163,0.00024091898,0.00018233442,0.0001432352,0.00014920862],"domain_scores_gemma":[0.9995124,0.00010005146,0.000072354254,0.00023686863,0.000046286117,0.000032088883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053176546,0.00008416244,0.00011749371,0.00011391649,0.00012965273,0.000009838901,0.00009712397,0.000055621585,0.0000016952688],"category_scores_gemma":[0.00016094933,0.00005339808,0.000020540361,0.00008508499,0.0005493898,0.000100811616,0.000038048616,0.000028760607,1.9944476e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003004522,0.00030233353,0.006046832,0.0001886196,0.0004071404,5.8138363e-7,0.00097574154,0.28061748,0.28089523,0.38154298,0.020657368,0.028065227],"study_design_scores_gemma":[0.012661282,0.0020558788,0.030118989,0.00011659997,0.00044625264,0.000019278497,0.0020126046,0.2506435,0.3695435,0.26952428,0.062106315,0.0007515526],"about_ca_topic_score_codex":0.000003055793,"about_ca_topic_score_gemma":0.000010327284,"teacher_disagreement_score":0.5699776,"about_ca_system_score_codex":0.000043755903,"about_ca_system_score_gemma":0.000020529478,"threshold_uncertainty_score":0.21775106},"labels":[],"label_agreement":null},{"id":"W2102208073","doi":"","title":"Microgrids: An emerging paradigm for meeting building electricity and heat requirements efficiently and with appropriate energy quality","year":2007,"lang":"en","type":"article","venue":"University of North Texas Digital Library (University of North Texas)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory; National Technical University of Athens; National and Kapodistrian University of Athens; Office of Electricity; University of Toronto; California Energy Commission; U.S. Department of Energy","keywords":"Paradigm shift; Electricity; Renewable energy; Electricity generation; Grid; Service (business); Quality (philosophy); Environmental economics; Software deployment; Computer science; Architectural engineering; Systems engineering; Engineering; Electrical engineering; Power (physics); Economics; Economy","score_opus":0.0107491694159363,"score_gpt":0.18567965291423044,"score_spread":0.17493048349829415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102208073","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95657104,0.00013331059,0.041374136,0.000038445378,0.00004881524,0.00024712944,0.00016294958,0.0002338671,0.001190323],"genre_scores_gemma":[0.99397403,0.0001732444,0.00533722,0.000019003472,0.000029770805,4.34368e-8,0.00018982432,0.000036570003,0.00024027361],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99843454,0.000033918303,0.0002453588,0.00050339976,0.00028878526,0.00049397466],"domain_scores_gemma":[0.9990875,0.00011915186,0.00016825112,0.00030549112,0.000058356964,0.00026124355],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016824174,0.00030569537,0.000440078,0.00043150352,0.00027634756,0.00005486507,0.00044251222,0.00007801696,0.000009606746],"category_scores_gemma":[0.000007675867,0.00039609754,0.00010092286,0.00058545667,0.00028128264,0.0022169622,0.00033891574,0.00012885928,9.752432e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041905564,0.00013437016,0.9689847,0.00025911006,0.00025816247,0.000042717096,0.00010592798,0.013224835,0.000009978777,0.00065504975,0.00012573226,0.015780317],"study_design_scores_gemma":[0.0015983189,0.0003320735,0.97749996,0.00008161828,0.00011514506,0.0000058313076,0.00016845549,0.008100133,0.00023725188,0.000056934405,0.011279329,0.00052495295],"about_ca_topic_score_codex":0.0004491296,"about_ca_topic_score_gemma":0.0014050127,"teacher_disagreement_score":0.037403025,"about_ca_system_score_codex":0.00006950374,"about_ca_system_score_gemma":0.00003327239,"threshold_uncertainty_score":0.9998491},"labels":[],"label_agreement":null},{"id":"W2102640484","doi":"10.1109/pes.2008.4596384","title":"Concept of Best Energy Transfer Scenario and a True Expression for Power Factor","year":2008,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Lossless compression; Maximum power transfer theorem; Computer science; Line (geometry); Point (geometry); Power (physics); Transfer (computing); Transmission line; Electric power transmission; Energy (signal processing); Value (mathematics); Power factor; Transmission (telecommunications); Index (typography); Reliability engineering; Mathematical optimization; Electrical engineering; Algorithm; Mathematics; Telecommunications; Engineering; Statistics; Physics; Data compression","score_opus":0.013582362716289886,"score_gpt":0.18936519108354438,"score_spread":0.1757828283672545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102640484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68604493,0.0003659799,0.30389035,0.000030577692,0.00033451602,0.00013457303,0.000017442073,0.00014832211,0.009033282],"genre_scores_gemma":[0.9974904,0.00007551165,0.0012050952,0.000033085737,0.000034645513,0.000022972514,0.000004839365,0.000022384967,0.001111049],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995453,0.0000046146292,0.00013218548,0.00010765606,0.00007804664,0.00013224204],"domain_scores_gemma":[0.9997837,0.000028546896,0.0000051021584,0.000120341836,0.000016254231,0.00004605325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000135289665,0.000099713805,0.00013089378,0.00004698558,0.000026148326,0.0000041690273,0.000055645665,0.000046581794,0.00017711132],"category_scores_gemma":[0.0000032555718,0.00008562894,0.000038671533,0.000040951774,0.000032734344,0.00007038885,0.000012368758,0.00002462863,0.0000011603029],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027245624,0.0006197073,0.0039700614,0.0006032189,0.0007040556,0.000045862595,0.012185735,0.28116038,0.5436758,0.042167604,0.093830466,0.020764697],"study_design_scores_gemma":[0.0015663969,0.00018620485,0.0020088998,0.000045682737,0.000017270104,0.0000060269263,0.00015955114,0.0147532895,0.85180354,0.000035399327,0.129079,0.00033872263],"about_ca_topic_score_codex":0.00003621026,"about_ca_topic_score_gemma":0.000018977466,"teacher_disagreement_score":0.31144547,"about_ca_system_score_codex":0.000013401544,"about_ca_system_score_gemma":0.0000042386587,"threshold_uncertainty_score":0.3491847},"labels":[],"label_agreement":null},{"id":"W2103185317","doi":"10.1049/cp.2013.1023","title":"Optimization model for the energy supply in city quarters","year":2013,"lang":"en","type":"article","venue":"22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Bundesministerium für Wirtschaft und Technologie","keywords":"Investment (military); Electricity; Environmental economics; Photovoltaic system; Quarter (Canadian coin); Work (physics); Energy supply; Order (exchange); Load shifting; Supply and demand; Mains electricity; Distributed generation; Energy consumption; Computer science; Energy (signal processing); Economics; Microeconomics; Engineering; Renewable energy; Electrical engineering; Finance; Mechanical engineering","score_opus":0.017533753198245523,"score_gpt":0.21602539417382152,"score_spread":0.198491640975576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103185317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027473718,0.00004566857,0.96806496,0.0022706199,0.00030419254,0.00029593092,0.00013507003,0.00010671421,0.0013031135],"genre_scores_gemma":[0.9972318,0.0006819867,0.0001811354,0.00027088012,0.000082112165,0.00037265662,0.0009090127,0.000012253018,0.00025815784],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907887,0.000019971043,0.00025415048,0.0002126333,0.00020265525,0.0002317175],"domain_scores_gemma":[0.99952376,0.00007029719,0.00005008954,0.00012265333,0.00018230028,0.00005091298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011427863,0.00015547816,0.00011543531,0.000111941685,0.000100192054,0.00013471881,0.00015229723,0.00007857013,0.00021545216],"category_scores_gemma":[0.00003140633,0.00013873074,0.000046889807,0.00015718327,0.00003530211,0.00034649743,0.000017871713,0.00010604698,0.000011383865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024981036,0.000042933105,0.00013082652,0.0000064171345,0.000030266332,1.9947939e-7,0.000031573072,0.9173344,0.0003587571,0.057294875,0.020455198,0.0042895945],"study_design_scores_gemma":[0.00046630553,0.00004142356,0.0024176256,0.000019494688,0.000008250082,0.0000010592869,0.000038550523,0.99230707,0.00069177675,0.0022342466,0.0016192115,0.00015497729],"about_ca_topic_score_codex":0.00028794786,"about_ca_topic_score_gemma":0.00010731029,"teacher_disagreement_score":0.9697581,"about_ca_system_score_codex":0.0002066207,"about_ca_system_score_gemma":0.00001814442,"threshold_uncertainty_score":0.5657276},"labels":[],"label_agreement":null},{"id":"W2106458740","doi":"10.1145/2208828.2208856","title":"An analysis of peak demand reductions due to elasticity of domestic appliances","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Duration (music); Elasticity (physics); Price elasticity of demand; Peak demand; Power demand; Dynamic demand; Computer science; Load management; Peak load; Automotive engineering; Reliability engineering; Environmental science; Power (physics); Engineering; Economics; Electrical engineering; Electricity; Microeconomics; Power consumption; Materials science","score_opus":0.009260906152758657,"score_gpt":0.24576036170248905,"score_spread":0.2364994555497304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106458740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7467189,0.000047393743,0.24825725,0.000012941245,0.00020730663,0.000050728064,0.0000041566027,0.00006795082,0.0046334113],"genre_scores_gemma":[0.99479413,0.000006778947,0.005017024,0.0000058757623,0.00007430438,0.000014759268,0.0000050009694,0.0000083055265,0.00007379591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994832,0.000010095355,0.00017918508,0.00007722131,0.000106627995,0.0001436206],"domain_scores_gemma":[0.99960774,0.000029276178,0.000020769694,0.0002313563,0.000024837425,0.00008601388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010864168,0.000070972004,0.00019928718,0.0002649249,0.000014417192,0.000003908409,0.00009484113,0.000020718522,0.00020362569],"category_scores_gemma":[0.000013952374,0.00006615432,0.000049578328,0.00073297694,0.000019605655,0.00010021529,0.000019475254,0.000024650806,0.000009884611],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017129163,0.000044513192,0.0072223954,0.000026592847,0.0003932466,2.0096506e-7,0.00012129393,0.98630273,0.0033809924,0.0019513837,0.00032522177,0.0002297182],"study_design_scores_gemma":[0.00009447762,0.000039753162,0.77686393,0.000009741137,0.0011616228,0.0000013217522,0.00036639257,0.20702131,0.013150432,0.00003196374,0.0010788211,0.00018024046],"about_ca_topic_score_codex":0.000093504466,"about_ca_topic_score_gemma":0.000099132616,"teacher_disagreement_score":0.77928144,"about_ca_system_score_codex":0.000022382543,"about_ca_system_score_gemma":0.0000022205377,"threshold_uncertainty_score":0.2697695},"labels":[],"label_agreement":null},{"id":"W2107609298","doi":"10.1109/tsg.2011.2114678","title":"Wireless Sensor Networks for Cost-Efficient Residential Energy Management in the Smart Grid","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":545,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Energy management; Wireless sensor network; Network packet; Computer science; Efficient energy use; Wireless; Computer network; Environmental economics; Energy (signal processing); Telecommunications; Engineering; Electrical engineering","score_opus":0.023070223862564326,"score_gpt":0.21655173535019884,"score_spread":0.1934815114876345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107609298","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015398685,0.000058535614,0.9659837,0.00012930976,0.011028782,0.0011214943,0.000049262388,0.0003965713,0.0058336556],"genre_scores_gemma":[0.99442697,0.00033422644,0.0012845963,0.00041063476,0.00067393313,0.002099007,0.000029214982,0.00011870839,0.00062274304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977871,0.00010202374,0.00052402576,0.00047327369,0.0003961076,0.00071743445],"domain_scores_gemma":[0.9989171,0.00012961129,0.00005265584,0.00074846705,0.000043301672,0.000108874316],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043624727,0.00040051338,0.00029648628,0.00039740774,0.00024450445,0.000071675044,0.00050462503,0.00013927952,0.00011314345],"category_scores_gemma":[0.0000013624551,0.00036130758,0.00024014978,0.00055499,0.000070020826,0.00011110225,0.000005870056,0.00031495458,0.000047597514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013822685,0.0002724057,0.000018405615,0.00004972024,0.00022289515,0.000049343107,0.00030824757,0.97849953,0.000036463334,0.0007474132,0.010771561,0.008885792],"study_design_scores_gemma":[0.0028813416,0.00024337058,0.0032968228,0.00012558472,0.00039436645,0.000029616802,0.0006981724,0.8347794,0.00937093,0.00006316919,0.14700662,0.0011105962],"about_ca_topic_score_codex":0.00030232075,"about_ca_topic_score_gemma":0.00110377,"teacher_disagreement_score":0.9790282,"about_ca_system_score_codex":0.00019753176,"about_ca_system_score_gemma":0.000010491713,"threshold_uncertainty_score":0.9998839},"labels":[],"label_agreement":null},{"id":"W2109634777","doi":"10.1109/iccw.2011.5963580","title":"Distributed Scheduling in Smart Grid Communications with Dynamic Power Demands and Intermittent Renewable Energy Resources","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Renewable energy; Smart grid; Computer science; Markov decision process; Scheduling (production processes); Grid; Distributed computing; Dynamic priority scheduling; Mathematical optimization; Demand response; Markov process; Engineering; Electricity; Electrical engineering; Telecommunications; Quality of service","score_opus":0.01051216123275808,"score_gpt":0.18568886646150431,"score_spread":0.17517670522874623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109634777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8078039,0.0007430965,0.12680323,0.0001750898,0.00021579345,0.00012177316,0.000009345581,0.00050908385,0.06361869],"genre_scores_gemma":[0.9923607,0.00019496559,0.0070116203,0.000046543075,0.000008098496,0.00004307589,0.00003732757,0.000027106418,0.0002705374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993332,0.000022224509,0.00019542278,0.0001552946,0.000079534504,0.00021431432],"domain_scores_gemma":[0.9993293,0.000026125084,0.00002172335,0.0005443424,0.000017709459,0.00006075914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098527475,0.0001406743,0.00013882757,0.00013694489,0.000049310296,0.00002814625,0.00026129518,0.00004309317,0.000049196584],"category_scores_gemma":[0.000005009578,0.00012259549,0.000017706301,0.0002133843,0.00006169575,0.00011509937,0.00019910712,0.00008889385,0.0000028941756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115302464,0.00032664154,0.1159404,0.00012073907,0.0005289116,0.000066750436,0.002953371,0.8664025,0.00077183713,0.0064181685,0.0028690724,0.0034863295],"study_design_scores_gemma":[0.0008861941,0.00010945854,0.11729827,0.00016326028,0.000039492723,0.000014062694,0.0012256113,0.8491217,0.00085393526,0.00024544608,0.02952923,0.0005133425],"about_ca_topic_score_codex":0.0014739208,"about_ca_topic_score_gemma":0.011486421,"teacher_disagreement_score":0.18455683,"about_ca_system_score_codex":0.00006787081,"about_ca_system_score_gemma":0.000004091461,"threshold_uncertainty_score":0.6409693},"labels":[],"label_agreement":null},{"id":"W2110421102","doi":"10.1109/ccece.2014.6901159","title":"Agent-based simulation of home energy management system in residential demand response","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Load management; Peak demand; Home automation; Energy management system; Computer science; Energy management; Demand management; Energy consumption; Multi-agent system; Electricity; Environmental economics; Energy (signal processing); Engineering; Telecommunications","score_opus":0.005849673359613627,"score_gpt":0.1928815167796781,"score_spread":0.1870318434200645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110421102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.304416,0.000031783777,0.68680704,0.000019521332,0.00043816795,0.00010770439,8.1149506e-7,0.000267858,0.007911083],"genre_scores_gemma":[0.9984937,0.0000038992603,0.0009658969,0.000023784387,0.00004470032,0.00002553166,0.0000058498454,0.000026554626,0.00041010877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900335,0.000115580166,0.00032250246,0.00015557602,0.00022208404,0.00018092126],"domain_scores_gemma":[0.999486,0.00011120577,0.00003287641,0.00031661603,0.000016290185,0.00003696151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005112649,0.000120903635,0.00016122102,0.000386948,0.00001619487,0.000015990272,0.0001279626,0.000045788755,0.00003297588],"category_scores_gemma":[0.000010044806,0.00012700373,0.000042412856,0.00023442114,0.000011307575,0.00006359323,0.00004144799,0.000030383662,0.000014720178],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012465636,0.000013452891,0.00027476996,0.00021064177,0.000030626357,0.000010472532,0.000014502751,0.9923596,0.0003392936,0.0054829028,0.00040616954,0.0007329071],"study_design_scores_gemma":[0.0008021202,0.000026060816,0.02077559,0.00007217704,0.000018026625,1.802184e-7,0.000035194887,0.9683473,0.0029805268,0.0000283112,0.0067814724,0.00013305517],"about_ca_topic_score_codex":0.000062421095,"about_ca_topic_score_gemma":0.00008585308,"teacher_disagreement_score":0.6940777,"about_ca_system_score_codex":0.00014260424,"about_ca_system_score_gemma":0.0000032006094,"threshold_uncertainty_score":0.5179062},"labels":[],"label_agreement":null},{"id":"W2110769230","doi":"10.1002/sec.895","title":"CIT: A credit‐based incentive tariff scheme with fraud‐traceability for smart grid","year":2013,"lang":"en","type":"article","venue":"Security and Communication Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Tariff; Incentive; Computer science; Traceability; Smart grid; Database transaction; Economic shortage; Computer security; Demand response; Power (physics); Business; Environmental economics; Microeconomics; Electricity; Government (linguistics); Economics; Database; Electrical engineering","score_opus":0.004988190215180597,"score_gpt":0.17795197697595788,"score_spread":0.17296378676077728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110769230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7826227,0.005674885,0.1906107,0.002999085,0.00087462337,0.0033239133,0.00003778505,0.0016834332,0.01217285],"genre_scores_gemma":[0.9918155,0.00028540802,0.006849458,0.00020908476,0.00011153852,0.00053306686,0.00015390675,0.000024583676,0.00001742036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992261,0.000064332475,0.00019926035,0.00017591742,0.00010297714,0.00023141282],"domain_scores_gemma":[0.9988612,0.00018249759,0.00004833435,0.00072278344,0.00010573739,0.00007946849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023641679,0.0001595595,0.00016358348,0.000041366333,0.00019496358,0.00008461885,0.00028276007,0.00010902887,0.000057602036],"category_scores_gemma":[0.000015459796,0.00015473201,0.00003696438,0.0001666182,0.000118988006,0.00023908682,0.000103674,0.00028195613,0.000004730547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025431157,0.00066063926,0.039632004,0.0006469127,0.00067433075,0.0000014022829,0.0028655548,0.8252987,0.000049346647,0.021833725,0.09442828,0.013654784],"study_design_scores_gemma":[0.00060629024,0.00004965472,0.013683528,0.000054526474,0.000022111783,3.8538602e-7,0.000168899,0.96234983,0.00003350781,0.0016241905,0.021192394,0.0002146536],"about_ca_topic_score_codex":0.00014970102,"about_ca_topic_score_gemma":0.00039496794,"teacher_disagreement_score":0.20919281,"about_ca_system_score_codex":0.000054867956,"about_ca_system_score_gemma":0.0000105036615,"threshold_uncertainty_score":0.6309788},"labels":[],"label_agreement":null},{"id":"W2113286802","doi":"10.18086/eurosun.2010.06.24","title":"Load Matching and Grid Interaction of Net Zero Energy Buildings","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":149,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Zero-energy building; Zero (linguistics); Grid; Net (polyhedron); Computer science; Matching (statistics); Energy (signal processing); Mathematics; Statistics; Geometry","score_opus":0.004054249245348528,"score_gpt":0.18894129931515705,"score_spread":0.18488705006980852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113286802","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91028035,0.000029118604,0.057568908,0.000052510368,0.0018938407,0.000022105693,7.0081205e-7,0.00019347477,0.029958978],"genre_scores_gemma":[0.9959261,0.00004019286,0.003504954,0.000044499157,0.00015216367,0.0000041549506,0.0000021126955,0.000016050917,0.00030979715],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996137,0.0000030505487,0.000116643736,0.00008603359,0.000082728424,0.00009785374],"domain_scores_gemma":[0.9997948,0.000020980084,0.000016510723,0.0001211604,0.000014685631,0.00003186176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006391775,0.000075980584,0.00007981508,0.00005760027,0.000014148463,0.000018637675,0.00005876266,0.000033851233,0.00010674379],"category_scores_gemma":[0.0000059146996,0.00007354311,0.000017470558,0.000052501848,0.000011878901,0.00013861828,0.00004609472,0.00008351343,0.0000042090096],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015465146,0.00003480249,0.0010969386,0.000112843525,0.00015254441,0.000006037414,0.00040940466,0.20557375,0.55916864,0.16318111,0.032908667,0.03733978],"study_design_scores_gemma":[0.0005223516,0.000041981504,0.0043906043,0.000042807915,0.000033844313,0.000024764055,0.00014102778,0.06923483,0.2591543,0.0032603792,0.6627243,0.0004288075],"about_ca_topic_score_codex":0.00053794956,"about_ca_topic_score_gemma":0.0002746,"teacher_disagreement_score":0.62981564,"about_ca_system_score_codex":0.000017577435,"about_ca_system_score_gemma":0.000002173678,"threshold_uncertainty_score":0.2999001},"labels":[],"label_agreement":null},{"id":"W2114147640","doi":"10.1109/pesgm.2012.6344624","title":"Tracking energy consumptions of home appliances using electrical signature data","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Smart meter; Metering mode; Home automation; Electricity meter; Harmonics; Computer science; Energy conservation; Tracking (education); Electric potential energy; Energy (signal processing); Metre; Real-time computing; Power (physics); Embedded system; Electrical engineering; Telecommunications; Engineering; Voltage","score_opus":0.05907985420678087,"score_gpt":0.2635793518834201,"score_spread":0.20449949767663922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114147640","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13233562,0.009483729,0.8383103,0.00005408153,0.0017550001,0.00014568889,0.000036941365,0.00076534745,0.017113276],"genre_scores_gemma":[0.99231523,0.00013348904,0.007118588,0.000028639584,0.000250939,0.000004115194,0.00003115312,0.000022003125,0.000095823976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993039,0.000011345699,0.0001618221,0.000116329924,0.000135199,0.00027141417],"domain_scores_gemma":[0.99947125,0.000044821714,0.000020881767,0.00038939298,0.0000142210065,0.000059426868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001020336,0.00010284031,0.0001307738,0.00008694339,0.000029238001,0.000012808098,0.000267346,0.000060249153,0.00013165802],"category_scores_gemma":[0.000008173588,0.00009805422,0.000023040628,0.00023644761,0.000022337817,0.00032150745,0.00009290712,0.00008339635,0.000007341303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013404889,0.0002508058,0.021091048,0.00022418257,0.0006087728,0.0000063285424,0.00015533796,0.7224253,0.084639505,0.08439339,0.043916743,0.042275224],"study_design_scores_gemma":[0.00033672567,0.000011819638,0.007665272,0.000034041135,0.00011356657,0.000011585235,0.000057833528,0.8489756,0.024031982,0.00014312589,0.11813739,0.000481069],"about_ca_topic_score_codex":0.000034132412,"about_ca_topic_score_gemma":0.000016178408,"teacher_disagreement_score":0.8599796,"about_ca_system_score_codex":0.00003585494,"about_ca_system_score_gemma":0.0000057242414,"threshold_uncertainty_score":0.39985347},"labels":[],"label_agreement":null},{"id":"W2114854054","doi":"10.1016/j.apenergy.2015.10.074","title":"Renewable resources portfolio optimization in the presence of demand response","year":2015,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Pacific Institute for Climate Solutions; Battelle; Natural Resources Canada; U.S. Department of Energy","keywords":"Demand response; Renewable energy; Renewable resource; Portfolio; Environmental economics; Electricity; Electricity demand; Electricity generation; Peak demand; Economics; Natural resource economics; Engineering; Power (physics)","score_opus":0.010619132160983901,"score_gpt":0.1928307216815364,"score_spread":0.1822115895205525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114854054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3934062,0.0007571107,0.24356733,0.00020853458,0.00044493383,0.00024785628,0.0000027139408,0.00033575954,0.36102957],"genre_scores_gemma":[0.99774885,0.000060312337,0.0016222637,0.00006277201,0.000057738645,0.00006700231,0.0000066126427,0.00001988025,0.0003545543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992483,0.000054164826,0.0001958355,0.00011993948,0.0002183336,0.00016338714],"domain_scores_gemma":[0.99949336,0.00009439165,0.000031966527,0.0003264527,0.000016768368,0.00003705112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054904463,0.00009645273,0.00011267746,0.00012351354,0.000016385677,0.000016484579,0.00024725945,0.000047081332,0.00001298981],"category_scores_gemma":[0.000030773543,0.00007978662,0.000016367603,0.00037984393,0.00002903438,0.000052117237,0.00004666125,0.00004144822,0.0000021087124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008408072,0.00001573476,0.000042592656,0.0000062079052,0.0000103060365,0.0000042022607,0.00042676646,0.9861421,0.00044324377,0.002829042,0.009864147,0.00013157674],"study_design_scores_gemma":[0.0011681331,0.00007979223,0.0012672107,0.000031053816,0.000026399672,0.000005384791,0.0014202065,0.7156034,0.016787497,0.0017043382,0.26153478,0.00037175696],"about_ca_topic_score_codex":0.00031695628,"about_ca_topic_score_gemma":0.00010116053,"teacher_disagreement_score":0.60434264,"about_ca_system_score_codex":0.00003620942,"about_ca_system_score_gemma":0.0000114296945,"threshold_uncertainty_score":0.32536042},"labels":[],"label_agreement":null},{"id":"W2115383271","doi":"10.1109/repcon.2006.1649054","title":"The Energy Policy Act of 2005 and its Impact on Distributed Generation","year":2006,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Electricity; Distributed generation; Incentive; Electricity generation; Electricity market; Environmental economics; Electricity retailing; Business; Grid; Energy policy; Smart grid; Electric power transmission; Industrial organization; Power (physics); Renewable energy; Economics; Engineering; Electrical engineering; Microeconomics; Political science; Law","score_opus":0.006091619740424931,"score_gpt":0.216841067364056,"score_spread":0.21074944762363107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115383271","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.952086,0.00060002715,0.015603625,0.0006753489,0.00027440308,0.00009603976,0.00003374363,0.00023192604,0.030398894],"genre_scores_gemma":[0.99873805,0.00014676632,0.000026067026,0.00002052453,0.00031870455,0.0000058976425,0.00004120511,0.000010888095,0.0006918872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995986,0.00000951299,0.00010620175,0.00006160305,0.000080260514,0.00014378571],"domain_scores_gemma":[0.9998094,0.000024438004,0.000013855623,0.000116455056,0.000011402478,0.000024492507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004987556,0.00008084831,0.00006119296,0.000047359532,0.00003669099,0.000022260527,0.00005092485,0.000023748846,0.000019785131],"category_scores_gemma":[0.000006860702,0.00005097394,0.00002398298,0.00009684227,0.000007936967,0.00004172598,0.000015006198,0.000021986012,0.0000029568369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032244686,0.000008441022,0.000097260556,0.0000029071975,0.000028899221,4.101968e-7,0.0000024198482,0.906497,0.0068660816,0.04823331,0.037003405,0.0012566263],"study_design_scores_gemma":[0.00026198404,0.000042021216,0.034361415,0.000004517731,0.000010411793,0.0000013616585,0.000004518804,0.808386,0.10278862,0.00015396446,0.053838875,0.00014630207],"about_ca_topic_score_codex":0.00047433126,"about_ca_topic_score_gemma":0.00030557244,"teacher_disagreement_score":0.098111,"about_ca_system_score_codex":0.00006896169,"about_ca_system_score_gemma":0.000006609201,"threshold_uncertainty_score":0.20786569},"labels":[],"label_agreement":null},{"id":"W2116347721","doi":"10.1109/pes.2007.386127","title":"Optimal Operation of a Disco in Competitive Electricity Markets with Elasticity Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Electricity market; Price elasticity of demand; Elasticity (physics); Computer science; Supply and demand; Context (archaeology); Operations research; Industrial organization; Microeconomics; Economics; Engineering","score_opus":0.0024075307191921943,"score_gpt":0.18133982192014006,"score_spread":0.17893229120094786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116347721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7078216,0.000099588084,0.2903708,0.0000065755007,0.00039832073,0.0001698069,0.0000015834432,0.0001810635,0.00095068145],"genre_scores_gemma":[0.96246433,0.000021967468,0.03722807,0.000020543244,0.00015448572,0.000023942104,0.0000052515893,0.00006376456,0.000017644525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855524,0.000023621846,0.00035147238,0.00025350013,0.0002781011,0.00053808553],"domain_scores_gemma":[0.9994526,0.00021362679,0.000045457822,0.00016634192,0.000043010834,0.00007899718],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00065089547,0.00027873146,0.00029870935,0.00011244979,0.000037946706,0.000025267615,0.00014118613,0.000097709686,0.000004784773],"category_scores_gemma":[0.00004161392,0.00028179557,0.00009800021,0.0004567935,0.000027078197,0.00014569335,0.000032027994,0.00027880422,0.0000018334871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016140966,0.000027270815,0.0015382577,0.00015401126,0.000094223244,0.000012057129,0.0004526062,0.904833,0.09248338,0.00021891826,0.00008503325,0.000085064494],"study_design_scores_gemma":[0.0006352191,0.0000745518,0.033836566,0.0002214513,0.00002411992,0.000004526522,0.00008157735,0.75220644,0.21242182,0.000001115183,0.00013214446,0.00036049384],"about_ca_topic_score_codex":0.00003256942,"about_ca_topic_score_gemma":0.000025954161,"teacher_disagreement_score":0.25464275,"about_ca_system_score_codex":0.0002637321,"about_ca_system_score_gemma":0.000012856512,"threshold_uncertainty_score":0.9999634},"labels":[],"label_agreement":null},{"id":"W2118052644","doi":"10.1109/iswpc.2011.5751338","title":"On the design and implementation of a home energy management system","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy management; Enabling; Smart grid; Energy management system; Home automation; Computer science; Energy consumption; Key (lock); Building management system; Holistic management; Scheduling (production processes); Energy (signal processing); Computer security; Telecommunications; Engineering; Operations management","score_opus":0.016197670401229252,"score_gpt":0.18401623242995493,"score_spread":0.1678185620287257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118052644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06849766,0.000055306893,0.8366706,0.000028915685,0.00031080304,0.00031633102,0.0000010786116,0.00028504772,0.09383428],"genre_scores_gemma":[0.9961311,0.000038028902,0.0035692947,0.000035031673,0.0000096205395,0.000071395305,7.497107e-7,0.000012550465,0.00013221623],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960583,0.00002068194,0.000116397685,0.00007436842,0.0000879526,0.00009475048],"domain_scores_gemma":[0.9997777,0.000025088562,0.000015324777,0.0001587461,0.0000063232465,0.00001682953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012887221,0.00007152388,0.00006127904,0.00006263707,0.000018953277,0.0000067118845,0.000076539116,0.000011277136,0.00012160339],"category_scores_gemma":[3.0948215e-7,0.00004907883,0.000013938058,0.00006999211,0.000009068312,0.000029974117,0.00003163601,0.000014092555,0.0000063603075],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005466291,0.0000069432917,0.000067697096,0.00008446593,0.0001338689,0.000003595729,0.000194289,0.013796021,0.00006798845,0.97642994,0.00396725,0.005242466],"study_design_scores_gemma":[0.0047734478,0.0011292476,0.12500823,0.00043240827,0.000627796,0.000020974834,0.028441861,0.53052145,0.26975715,0.014622468,0.022673069,0.0019918964],"about_ca_topic_score_codex":0.00008733021,"about_ca_topic_score_gemma":0.000012258509,"teacher_disagreement_score":0.9618075,"about_ca_system_score_codex":0.00002896032,"about_ca_system_score_gemma":8.365744e-7,"threshold_uncertainty_score":0.20013766},"labels":[],"label_agreement":null},{"id":"W2118581055","doi":"10.1109/pes.2011.6039062","title":"Achieving greater VVO benefits through AMI implementation","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"BC Hydro","keywords":"Metering mode; Risk analysis (engineering); Computer science; Reliability engineering; Engineering; Business","score_opus":0.04400203996157525,"score_gpt":0.22254989435232875,"score_spread":0.1785478543907535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118581055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7173647,0.000058662106,0.026740009,0.000037628495,0.0006951407,0.00013207355,0.00000237267,0.0007348125,0.25423455],"genre_scores_gemma":[0.9933113,0.00003632395,0.006041122,0.0001390009,0.00009042388,0.00002739224,0.000010287182,0.000030284351,0.00031386397],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994408,0.000006144766,0.00014051532,0.000118675416,0.00008952501,0.00020436953],"domain_scores_gemma":[0.99976546,0.0000043945215,0.000011081049,0.00018170434,0.000010592818,0.000026748534],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004646518,0.00010847235,0.00007312099,0.000042555213,0.000032063035,0.000017169377,0.00009563428,0.000024747236,0.001925657],"category_scores_gemma":[0.000001026469,0.000101033795,0.000029416078,0.00008454815,0.000006602616,0.00023195102,0.000045413413,0.000038541086,0.00020419546],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032390053,0.00012228583,0.28140056,0.00031910135,0.0011580568,0.000054651373,0.016960584,0.19872643,0.004590448,0.22862573,0.1031169,0.16489287],"study_design_scores_gemma":[0.0012435542,0.00012329403,0.82657367,0.000038384147,0.00010857212,0.000008784066,0.0016297719,0.008110913,0.109290086,0.00066030805,0.051183566,0.0010291011],"about_ca_topic_score_codex":0.00024124884,"about_ca_topic_score_gemma":0.00016313365,"teacher_disagreement_score":0.5451731,"about_ca_system_score_codex":0.000040062125,"about_ca_system_score_gemma":0.00000140554,"threshold_uncertainty_score":0.9989867},"labels":[],"label_agreement":null},{"id":"W2120645645","doi":"10.1109/isgt.2012.6175809","title":"A test bed for self-regulating distribution systems: Modeling integrated renewable energy and demand response in the GridLAB-D/MATLAB environment","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Pacific Northwest National Laboratory; Natural Environment Research Council","keywords":"Renewable energy; Demand response; MATLAB; Computer science; Distributed generation; Wind power; Automotive engineering; Engineering; Electrical engineering; Electricity","score_opus":0.00936627085406008,"score_gpt":0.18357982500050474,"score_spread":0.17421355414644465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120645645","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45948976,0.0007021566,0.53881556,0.00006325861,0.00016820866,0.00029676768,0.000013784083,0.00020653456,0.00024393256],"genre_scores_gemma":[0.9977772,0.00006469169,0.0015257159,0.000022771585,0.00010513433,0.0002825562,0.00008107403,0.000028054948,0.00011276607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989609,0.00009082869,0.0002906519,0.00015477346,0.00013987393,0.0003629893],"domain_scores_gemma":[0.99927896,0.00040141746,0.000028421124,0.00022426066,0.000011140844,0.000055781737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00105759,0.00017416156,0.0001536149,0.00006475877,0.00009880859,0.0000656203,0.00010136468,0.00006885276,0.0000043871237],"category_scores_gemma":[0.00007929717,0.00012956753,0.000025973048,0.00013687267,0.000011133618,0.0001846603,0.00004166123,0.000051826635,0.0000012283213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004012158,0.000039973085,0.00094307313,0.00005064127,0.000024884168,5.7699185e-7,0.00025994162,0.99556327,0.001156002,0.0007415195,0.0010985684,0.0000814208],"study_design_scores_gemma":[0.00042562457,0.000037867194,0.00050904765,0.00003491153,0.00002926988,0.000005725426,0.00072250864,0.9844467,0.0006345037,0.000027832539,0.01296319,0.00016280566],"about_ca_topic_score_codex":0.00052225665,"about_ca_topic_score_gemma":0.00005806354,"teacher_disagreement_score":0.53828746,"about_ca_system_score_codex":0.00024679425,"about_ca_system_score_gemma":0.000005654518,"threshold_uncertainty_score":0.5283611},"labels":[],"label_agreement":null},{"id":"W2121039373","doi":"10.1109/sege.2013.6707902","title":"Flexible residential smart grid simulation framework","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Smart grid; Demand response; Energy consumption; Scheduling (production processes); Grid; Electricity; Distributed computing; Consumption (sociology); Industrial engineering; Engineering; Operations management","score_opus":0.009668302214354042,"score_gpt":0.2186472836183008,"score_spread":0.20897898140394675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121039373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08796182,0.00006583408,0.77860355,0.00026825242,0.0035513015,0.00027043634,7.721085e-7,0.00195751,0.12732048],"genre_scores_gemma":[0.9891902,0.000010389811,0.006872836,0.00014417124,0.00060387416,0.00003773011,0.000007529179,0.000031010488,0.0031022087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993824,0.0000083682535,0.00014661149,0.00011662902,0.0001464929,0.00019950024],"domain_scores_gemma":[0.9996091,0.00005285172,0.000009665126,0.00025093294,0.000023969016,0.00005345629],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000049353686,0.00010055051,0.0000789493,0.00007770755,0.00003515161,0.00007599679,0.000105069776,0.0000640732,0.0035023752],"category_scores_gemma":[0.000021439835,0.00009952374,0.00003387565,0.00011271284,0.000009230294,0.00023884603,0.000041364852,0.000087679015,0.002300272],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.7190845e-7,0.0000045847696,0.0005064489,0.000011063331,0.000021191026,7.200745e-7,0.000025571195,0.94586504,0.00012853816,0.0022876996,0.049938757,0.0012096345],"study_design_scores_gemma":[0.00014860078,0.000014075092,0.03150642,0.000018300687,0.000012546576,4.261842e-7,0.00003086955,0.88643277,0.0038949414,0.0045306436,0.07315258,0.00025780508],"about_ca_topic_score_codex":0.00013572555,"about_ca_topic_score_gemma":0.000016453021,"teacher_disagreement_score":0.9012284,"about_ca_system_score_codex":0.000040847004,"about_ca_system_score_gemma":0.0000024496533,"threshold_uncertainty_score":0.99847656},"labels":[],"label_agreement":null},{"id":"W2121288295","doi":"10.22215/etd/2010-08785","title":"Towards the assessment of a residential electric storage system : analysis of Canadian residential electricity use and the development of a lithium-ion battery model","year":2010,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canadian Heritage; Queen's University; Library and Archives Canada","funders":"","keywords":"Electricity; Engineering; Electrical engineering","score_opus":0.012654528539019917,"score_gpt":0.22473391705540147,"score_spread":0.21207938851638156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121288295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96907175,0.0001613123,0.024471179,0.000029890141,0.00049572944,0.0006577002,0.000027872804,0.000050332885,0.005034264],"genre_scores_gemma":[0.99713945,0.000121098565,0.0017495577,0.0000071587115,0.00004561363,0.00009977196,0.00020669815,0.000046703706,0.0005839315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972731,0.00015465183,0.0011300342,0.00031283541,0.00078709534,0.0003422986],"domain_scores_gemma":[0.9983706,0.0001532464,0.00043813037,0.0006384955,0.0003100873,0.000089473935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001212178,0.00034430512,0.0008599597,0.0029611054,0.00012702956,0.00007497005,0.0004975176,0.0002806378,0.000025157873],"category_scores_gemma":[0.000059394653,0.00023771179,0.00025719352,0.002459732,0.00004297509,0.00012308154,0.000052794694,0.00044932408,2.9872737e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021451467,0.000056637244,0.0009892274,0.0019761936,0.010838795,0.000006139829,0.004502168,0.94944304,0.019926807,0.009488133,0.0017028609,0.00085550855],"study_design_scores_gemma":[0.00047640776,0.000019113724,0.14590019,0.00010999355,0.0033217117,8.049196e-7,0.0005375764,0.826706,0.022540605,0.000015874972,0.00007863489,0.00029307252],"about_ca_topic_score_codex":0.116775215,"about_ca_topic_score_gemma":0.63759583,"teacher_disagreement_score":0.5208206,"about_ca_system_score_codex":0.00038077164,"about_ca_system_score_gemma":0.00075868703,"threshold_uncertainty_score":0.9693606},"labels":[],"label_agreement":null},{"id":"W2121719138","doi":"10.5195/pjephl.2010.19","title":"Focusing on Demand Side Management in the Future of the Electric Grid","year":2010,"lang":"en","type":"article","venue":"Pittsburgh Journal of Environmental and Public Health Law","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Grid; Power grid; Electric power transmission; Telecommunications; Engineering; Electric power system; Power (physics); Geography; Electrical engineering; Physics","score_opus":0.006727325665731769,"score_gpt":0.19692306834394796,"score_spread":0.19019574267821618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121719138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9873142,0.0017712262,0.00018429472,0.0069293194,0.0011262288,0.00021789514,0.0000018722279,0.000007756357,0.002447172],"genre_scores_gemma":[0.99604946,0.0020291647,0.00009675327,0.0013488657,0.00045237064,0.0000033953338,5.401135e-7,0.000012788756,0.000006671895],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987992,0.00008334449,0.00040302332,0.000089065514,0.00034557938,0.0002797923],"domain_scores_gemma":[0.9995045,0.000047721576,0.00014470417,0.00020217175,0.0000032493,0.00009764358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090769125,0.00012346986,0.00016944195,0.00010788725,0.000105249754,0.0000314882,0.00027417677,0.000040846448,0.000025648784],"category_scores_gemma":[0.0000031909094,0.00007228306,0.00006174493,0.00014133536,0.00005962202,0.00013223472,0.00005310588,0.00044849023,9.006443e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015432759,0.002236578,0.044612452,0.0009635518,0.0009075774,0.000207291,0.0056645162,0.039936334,0.01570571,0.22212276,0.018876003,0.6486129],"study_design_scores_gemma":[0.0010833573,0.00024368968,0.43564904,0.00005897346,0.000028341257,0.00015025887,0.0010310304,0.0004422517,0.0003415549,0.0022253506,0.5585418,0.00020437727],"about_ca_topic_score_codex":0.0000136916315,"about_ca_topic_score_gemma":0.0000341628,"teacher_disagreement_score":0.64840853,"about_ca_system_score_codex":0.000082738596,"about_ca_system_score_gemma":0.00001005821,"threshold_uncertainty_score":0.29476178},"labels":[],"label_agreement":null},{"id":"W2122997343","doi":"10.1109/psce.2009.4840195","title":"A generic operations framework for discos in retail electricity markets","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Scheduling (production processes); Computer science; Operations research; Electricity market; Context (archaeology); Electricity retailing; Operations management; Engineering","score_opus":0.014024991046295213,"score_gpt":0.22600493485350226,"score_spread":0.21197994380720706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122997343","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12689562,0.00013389454,0.85716486,0.0006459226,0.00020925007,0.00030160198,0.00000149213,0.00028858506,0.014358795],"genre_scores_gemma":[0.94767445,0.00006271883,0.050964616,0.0003726518,0.00011286028,0.00009563425,0.00000830207,0.000015642794,0.00069311005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942684,0.000009160639,0.00014464543,0.0001264203,0.00006822265,0.00022472191],"domain_scores_gemma":[0.9997386,0.000033004846,0.00000451071,0.00018029257,0.000010202229,0.0000334338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008886671,0.00009603251,0.000098759316,0.00009898169,0.000030366129,0.00003259287,0.000103024875,0.000050520975,0.00009927844],"category_scores_gemma":[0.00004092677,0.00009251716,0.00003350143,0.00032030023,0.000003787299,0.00008866317,0.000009456764,0.00008175822,0.000011918305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000094094075,0.000049496055,0.00032530387,0.000013851148,0.00002214421,0.000003243223,0.000051485342,0.90714073,0.0008577041,0.06782706,0.008255676,0.0154438615],"study_design_scores_gemma":[0.00025295408,0.00004143385,0.029309094,0.000013041352,0.000009428152,8.3011855e-7,0.000014280954,0.95353115,0.0021921287,0.0035678635,0.010843073,0.00022472614],"about_ca_topic_score_codex":0.000008997144,"about_ca_topic_score_gemma":0.00009836192,"teacher_disagreement_score":0.82077885,"about_ca_system_score_codex":0.00008351346,"about_ca_system_score_gemma":0.0000058247156,"threshold_uncertainty_score":0.37727407},"labels":[],"label_agreement":null},{"id":"W2125214211","doi":"10.1109/tpwrs.2005.852147","title":"A Survey of Load Control Programs for Price and System Stability","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":115,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electric power system; Load management; Control (management); Computer science; Load regulation; Stability (learning theory); Control system; Demand side; Reliability engineering; Operations research; Power (physics); Economics; Environmental economics; Engineering; Electrical engineering; Voltage","score_opus":0.017335303402588154,"score_gpt":0.20852324337537573,"score_spread":0.19118793997278757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125214211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052511558,0.0003922717,0.9429326,0.00001250285,0.0016638595,0.0011849536,0.00013483402,0.00033419576,0.00083319936],"genre_scores_gemma":[0.99925727,0.0000066508264,0.00014751377,0.000004224828,0.000016424745,0.00045001745,0.0000024380586,0.00003573609,0.000079699945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988582,0.00007730552,0.0004036637,0.00021125186,0.00021620447,0.00023335814],"domain_scores_gemma":[0.9992355,0.0001557345,0.000051326137,0.00032954148,0.00014948117,0.000078423334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070613425,0.00017013196,0.00031364325,0.000075139185,0.000048893267,0.000034690962,0.00009856157,0.00007893478,0.000005623298],"category_scores_gemma":[0.0000046364203,0.00016513803,0.000066929184,0.00016648596,0.000030067806,0.00010119575,5.128394e-7,0.00008016704,0.000007745396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016660645,0.00027017176,0.0005807602,0.0020128326,0.0005692828,0.0000011189749,0.0005442276,0.9917051,0.00079401466,0.00014834573,0.0004930843,0.0027144374],"study_design_scores_gemma":[0.0034465403,0.00041044413,0.0052161263,0.00034272924,0.00015062788,0.000013784556,0.00057002116,0.96899676,0.004889566,6.578405e-7,0.015388538,0.00057422963],"about_ca_topic_score_codex":0.00035207198,"about_ca_topic_score_gemma":0.00045430986,"teacher_disagreement_score":0.94674575,"about_ca_system_score_codex":0.0002765783,"about_ca_system_score_gemma":0.000020027132,"threshold_uncertainty_score":0.6734134},"labels":[],"label_agreement":null},{"id":"W2126740271","doi":"10.1109/siecpc.2011.5876687","title":"Wireless Sensor Networks for smart grid applications","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Computer science; Telecommunications; Grid; Computer network; Computer security; Electrical engineering; Engineering","score_opus":0.017782046006270976,"score_gpt":0.1912954479795086,"score_spread":0.1735134019732376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126740271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018805488,0.000027930051,0.9137234,0.000019677913,0.0005597103,0.00032612024,0.000003929096,0.00060994254,0.08284873],"genre_scores_gemma":[0.9408171,0.0000766925,0.0509931,0.00028401343,0.0012946539,0.0021221468,0.000069975744,0.000114519855,0.004227806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953145,0.0000030162144,0.00011438114,0.00011479765,0.000043232114,0.00019311611],"domain_scores_gemma":[0.9996641,0.00002088317,0.000009149379,0.00023879937,0.000018876617,0.000048178583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005197784,0.00009047988,0.00007885131,0.000036608377,0.000037395755,0.000010027123,0.000112039066,0.000039237566,0.00012892036],"category_scores_gemma":[0.0000010953448,0.000089408015,0.000040243296,0.00009115975,0.0000114857085,0.000042837124,0.000022264301,0.00003998031,0.000049054124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014883548,0.000088857254,0.0016282769,0.00013168815,0.00027752892,0.00000254341,0.0001513486,0.70284355,0.00029292397,0.09881285,0.16804755,0.027708026],"study_design_scores_gemma":[0.00024245463,0.000016377215,0.0027336164,0.000004562005,0.00002948877,0.0000013606873,0.000052501015,0.604782,0.0018054912,0.00022915223,0.38984856,0.0002544432],"about_ca_topic_score_codex":0.00002231935,"about_ca_topic_score_gemma":0.000033183955,"teacher_disagreement_score":0.93893653,"about_ca_system_score_codex":0.000022298012,"about_ca_system_score_gemma":0.0000017425954,"threshold_uncertainty_score":0.3645953},"labels":[],"label_agreement":null},{"id":"W2126993083","doi":"10.1007/s12053-014-9265-7","title":"The benefits of combining utility-controlled demand response with residential zoned cooling","year":2014,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Cooling load; Air conditioning; Environmental science; Demand response; Cycling; Demographics; Peak demand; Passive cooling; Control (management); Meteorology; Engineering; Computer science; Mechanical engineering; Electricity; Geography","score_opus":0.004953163503203689,"score_gpt":0.18364890141367365,"score_spread":0.17869573791046997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126993083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8694574,0.00070050586,0.1227729,0.000069461465,0.0006184438,0.00011748844,9.986063e-7,0.00022503431,0.0060377144],"genre_scores_gemma":[0.99913746,0.000049941893,0.00024301404,0.000024142822,0.00010320974,0.000039847466,0.0000021777862,0.000037917118,0.0003623113],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839795,0.0002131389,0.0004073373,0.00022297491,0.0003729293,0.00038565768],"domain_scores_gemma":[0.99843526,0.00082510023,0.000091985785,0.00051196717,0.00006848141,0.00006721944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014147417,0.00019962975,0.00031800824,0.0001308298,0.00025291461,0.000053614644,0.00035611162,0.000056939705,0.000015080442],"category_scores_gemma":[0.00024423428,0.00013934233,0.00007643194,0.00033335807,0.00010928037,0.000067934336,0.00007183201,0.000101774895,0.000004151728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019921223,0.000028826178,0.0001213261,0.000011272327,0.00007276252,0.0000019575825,0.00013495176,0.9829934,0.0008173763,0.012150601,0.00021131684,0.001464062],"study_design_scores_gemma":[0.005270042,0.00031890956,0.012893617,0.000093567614,0.00008167438,0.0000054273028,0.00012153249,0.9595988,0.012410584,0.00013429752,0.008722981,0.00034857623],"about_ca_topic_score_codex":0.00004140543,"about_ca_topic_score_gemma":0.00011806494,"teacher_disagreement_score":0.12968,"about_ca_system_score_codex":0.00003109847,"about_ca_system_score_gemma":0.00002176944,"threshold_uncertainty_score":0.5682215},"labels":[],"label_agreement":null},{"id":"W2127297430","doi":"10.1109/jsac.2015.2481212","title":"Real-Time Energy Storage Management With Renewable Integration: Finite-Time Horizon Approach","year":2015,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Mathematical optimization; Lyapunov optimization; Time horizon; Renewable energy; Optimization problem; Dynamic programming; Energy management; System dynamics; Lyapunov function; Energy (signal processing); Lyapunov equation; Nonlinear system; Algorithm; Mathematics","score_opus":0.021570470876801105,"score_gpt":0.22653082313763445,"score_spread":0.20496035226083334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127297430","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027608499,0.0006008292,0.16116357,0.0010338133,0.00074819545,0.00062762963,0.00001879135,0.0013050229,0.80689365],"genre_scores_gemma":[0.92017937,0.0033044217,0.068865515,0.00010662232,0.0003696983,0.00027698866,0.00029614312,0.00017538086,0.0064258594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982006,0.00028204283,0.00048256305,0.0002132608,0.0004473785,0.00037415428],"domain_scores_gemma":[0.9978182,0.00016248984,0.00012903179,0.0014180228,0.00025512616,0.0002171781],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047912923,0.00029006533,0.00029716946,0.0006090515,0.0001957133,0.00015413723,0.0010811366,0.00009715101,0.000036268208],"category_scores_gemma":[0.00003759973,0.00026515446,0.00004952634,0.0014769777,0.000059976283,0.0002922016,0.00010308262,0.000526278,0.00006986945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005493316,0.00027292504,0.000038939237,0.000008410373,0.00018923318,0.000024491164,0.00020105028,0.9612292,0.00047875475,0.0015323542,0.03414044,0.0018292522],"study_design_scores_gemma":[0.0021047117,0.00056343654,0.00069762673,0.00034887635,0.0001250605,0.00012330785,0.00037618435,0.91947424,0.00094707444,0.0007445653,0.07371624,0.00077868416],"about_ca_topic_score_codex":0.000109890076,"about_ca_topic_score_gemma":0.00015488306,"teacher_disagreement_score":0.89257085,"about_ca_system_score_codex":0.00078427704,"about_ca_system_score_gemma":0.00007645897,"threshold_uncertainty_score":0.9999801},"labels":[],"label_agreement":null},{"id":"W2127769373","doi":"10.1155/2014/492320","title":"GridLAB-D: An Agent-Based Simulation Framework for Smart Grids","year":2014,"lang":"en","type":"article","venue":"Journal of Applied Mathematics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":201,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Office of Electricity; U.S. Department of Energy","keywords":"Smart grid; Computer science; Electric power system; Electricity; Wind power; Grid; Systems engineering; Distributed generation; Demand response; Production (economics); Renewable energy; Industrial engineering; Distributed computing; Power (physics); Electrical engineering; Engineering","score_opus":0.018863718541056805,"score_gpt":0.25216638569580274,"score_spread":0.23330266715474593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127769373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05050976,0.0000105916415,0.94639236,0.00003594123,0.0006364272,0.00017207155,0.000001722014,0.000091569535,0.002149553],"genre_scores_gemma":[0.59287876,0.0000030307715,0.4064049,0.00009420379,0.0005469187,0.000012080924,0.000003556627,0.000048984195,0.0000075562907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989143,0.0000065071877,0.0005215884,0.00008213578,0.00028050868,0.00019498025],"domain_scores_gemma":[0.9988466,0.00048541973,0.00021286249,0.00027332595,0.000079650315,0.0001021442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005585649,0.00016060608,0.0002844358,0.00014420686,0.0000450604,0.000050962273,0.00021468605,0.000095389136,0.000026105134],"category_scores_gemma":[0.000106896216,0.0001454815,0.00009930223,0.000112971764,0.000014705029,0.00009068481,0.00001348381,0.00015863392,0.000011484901],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018294366,0.000074697615,0.0000060674997,0.00025050057,0.00004608279,7.0188946e-7,0.00017435793,0.94812953,0.00045524846,0.048064005,0.00074912666,0.0020313645],"study_design_scores_gemma":[0.00057642447,0.00011193878,0.000052778385,0.000058792706,0.00008813787,0.0000015000736,0.00008844407,0.9260035,0.0026866917,0.057462342,0.012701457,0.00016797961],"about_ca_topic_score_codex":1.487188e-7,"about_ca_topic_score_gemma":7.2795905e-7,"teacher_disagreement_score":0.542369,"about_ca_system_score_codex":0.0000725539,"about_ca_system_score_gemma":0.000011167891,"threshold_uncertainty_score":0.59325635},"labels":[],"label_agreement":null},{"id":"W2128793456","doi":"10.1109/tste.2014.2309661","title":"Impact of Energy Storage Systems on Electricity Market Equilibrium","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":112,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; University of Waterloo","funders":"Government of Canada","keywords":"Energy storage; Electricity market; Arbitrage; Market clearing; Mixed complementarity problem; Market price; Demand response; Economic dispatch; Electric power system; Computer science; Smart grid; Electricity; Distributed generation; Mathematical optimization; Microeconomics; Economics; Renewable energy; Power (physics); Engineering; Electrical engineering; Finance","score_opus":0.004894339326047541,"score_gpt":0.19703263883692027,"score_spread":0.19213829951087272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128793456","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043371856,0.0001142027,0.9070088,0.000013832824,0.0010230765,0.000105992054,0.00001324331,0.0005080467,0.047840945],"genre_scores_gemma":[0.9815176,0.000096122196,0.000030388468,0.0000348543,0.000167979,0.000131791,0.0000062895574,0.00011294402,0.01790204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997862,0.00014392173,0.00041942112,0.00036701406,0.00040592655,0.00080175605],"domain_scores_gemma":[0.9986764,0.00019158355,0.000077425415,0.00072969304,0.0001413947,0.00018350726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027452028,0.000408771,0.00044592703,0.0007449316,0.000106589636,0.0000615551,0.0003122351,0.00017241262,0.00019318942],"category_scores_gemma":[0.000009905358,0.00040326058,0.00028485619,0.0008575764,0.000042652104,0.00022261571,0.0000035536705,0.00020118468,0.000007367554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011148507,0.0001686418,0.0000059448253,0.00011706994,0.0002705328,0.000019237656,0.000015721613,0.9817647,0.00092341116,0.0070026214,0.0078181205,0.0017825585],"study_design_scores_gemma":[0.00091958937,0.0010519653,0.00025232922,0.000052795996,0.00008475785,0.000009750734,0.00010039995,0.9180923,0.02740955,0.00021167511,0.051158413,0.00065647444],"about_ca_topic_score_codex":0.0022489794,"about_ca_topic_score_gemma":0.000033465723,"teacher_disagreement_score":0.93814576,"about_ca_system_score_codex":0.00089568266,"about_ca_system_score_gemma":0.00006096491,"threshold_uncertainty_score":0.9998419},"labels":[],"label_agreement":null},{"id":"W2129589829","doi":"10.1109/epec.2010.5697187","title":"A novel demand side management program using water heaters and particle swarm optimization","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Peaking power plant; Demand response; Computer science; Peak demand; Load management; Electricity; Load balancing (electrical power); Controller (irrigation); Smart grid; Electricity generation; Automotive engineering; Simulation; Power (physics); Engineering; Electrical engineering","score_opus":0.009289970468851329,"score_gpt":0.2065694320579727,"score_spread":0.19727946158912138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129589829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7153797,0.0000086291075,0.2800921,0.00008338304,0.0003978608,0.0002668476,2.9670957e-7,0.00045469074,0.0033164995],"genre_scores_gemma":[0.8484258,0.000010687868,0.15122157,0.000056447134,0.000051014995,0.000045843568,0.000004521114,0.00002728743,0.00015683583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937,0.0000036721538,0.00012837948,0.00015195287,0.00009100873,0.00025499775],"domain_scores_gemma":[0.99974996,0.000004051815,0.0000061745163,0.00016324785,0.000010662638,0.000065913926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009340275,0.00011360837,0.00007637523,0.000048460533,0.000049450562,0.00008357452,0.000055614903,0.000032683474,0.00004823101],"category_scores_gemma":[0.0000012080231,0.00009006369,0.000017268081,0.00006886773,0.000018458592,0.00014222364,0.00007270602,0.00005673334,0.000009158427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025114134,0.000030114728,0.00025966336,0.00003945218,0.00005784838,0.0000039252395,0.000074938966,0.9753703,0.021749035,0.00033445604,0.000053692067,0.0020240527],"study_design_scores_gemma":[0.00035597937,0.000012091884,0.0005971146,0.0000060468847,0.000037588106,0.000004534628,0.000029808187,0.9517337,0.04426978,0.000013251849,0.0027945489,0.00014552621],"about_ca_topic_score_codex":0.00002309331,"about_ca_topic_score_gemma":0.000025833671,"teacher_disagreement_score":0.13304609,"about_ca_system_score_codex":0.000019699031,"about_ca_system_score_gemma":8.0018e-7,"threshold_uncertainty_score":0.36726904},"labels":[],"label_agreement":null},{"id":"W2130577833","doi":"10.1109/iscc.2010.5546765","title":"Using wireless sensor networks for energy-aware homes in smart grids","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Wireless sensor network; Energy consumption; Computer science; Grid; Wireless; Computer network; Power consumption; Home automation; Scheme (mathematics); Telecommunications; Embedded system; Distributed computing; Computer security; Power (physics); Engineering; Electrical engineering","score_opus":0.012754326662145439,"score_gpt":0.21737710541396887,"score_spread":0.20462277875182344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130577833","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41440958,0.000048457092,0.57765496,0.00005683582,0.0030733193,0.00014853392,0.0000031771094,0.00044917577,0.004155972],"genre_scores_gemma":[0.99271965,0.00002337361,0.0059168325,0.00009142018,0.0005399756,0.000050735154,0.000017058052,0.000065516,0.000575447],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913704,0.000008173316,0.00020210903,0.00018782464,0.00009147533,0.00037337735],"domain_scores_gemma":[0.9995802,0.000055830526,0.000015490257,0.00026133694,0.000023099554,0.00006405448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011516799,0.00017289406,0.0001795778,0.00013457639,0.00003830676,0.00003895064,0.00013862182,0.00011707545,0.00006744686],"category_scores_gemma":[0.00000424967,0.00017348677,0.000057895868,0.00019282072,0.000018878265,0.000102981525,0.000047768746,0.00014154415,0.0000032270164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005767625,0.000015672758,0.0031108132,0.000035638062,0.000041170686,0.0000069589723,0.000019723608,0.98242784,0.0021867913,0.003662217,0.0030680897,0.005419325],"study_design_scores_gemma":[0.00032961887,0.00000765415,0.0013476064,0.0000133967615,0.00001177793,0.0000027484361,0.00003460731,0.97530365,0.0022621325,0.0000559165,0.020394696,0.0002362211],"about_ca_topic_score_codex":0.00018530944,"about_ca_topic_score_gemma":0.001690818,"teacher_disagreement_score":0.5783101,"about_ca_system_score_codex":0.000050919636,"about_ca_system_score_gemma":0.000006960931,"threshold_uncertainty_score":0.7074585},"labels":[],"label_agreement":null},{"id":"W2131789327","doi":"10.5547/issn0195-6574-ej-vol31-no3-6","title":"The Effect of Feedback by Text Message (SMS) and Email on Household Electricity Consumption: Experimental Evidence","year":2010,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Consumption (sociology); Quarter (Canadian coin); Control (management); Short Message Service; Business; Advertising; Economics; Computer science; Engineering; Telecommunications; Geography","score_opus":0.009181332522769174,"score_gpt":0.21470493105169902,"score_spread":0.20552359852892985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131789327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921652,0.0053219306,0.00048301078,0.00017693742,0.00083277596,0.000055438817,0.0000010676675,0.00005543074,0.0009081899],"genre_scores_gemma":[0.99779487,0.0015512739,0.000020139181,0.000050366034,0.00025937802,0.000014686798,3.6919428e-7,0.000027955877,0.00028098922],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998994,0.00013163323,0.00021887284,0.00010900784,0.00029629158,0.0002501997],"domain_scores_gemma":[0.9990751,0.00046505136,0.00007814555,0.00029028946,0.000013029486,0.00007837298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007124435,0.00017256037,0.00015530289,0.000045147233,0.00029748576,0.000101547594,0.0003490507,0.000053274594,0.000049952305],"category_scores_gemma":[0.0000424132,0.00009569991,0.00006275567,0.00009617198,0.00013389472,0.00011534376,0.000060817376,0.0004183383,0.0000055046753],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052369165,0.00008371627,0.004582869,0.00007301562,0.00063286955,0.000035104295,0.00034267444,0.1086619,0.74430877,0.0064569586,0.106823765,0.027474692],"study_design_scores_gemma":[0.0009781896,0.0005174047,0.0050451783,0.00012651471,0.000068163026,0.00022255776,0.000044980286,0.0080817295,0.9655864,0.00007403618,0.018967027,0.00028780228],"about_ca_topic_score_codex":0.000021331334,"about_ca_topic_score_gemma":0.000019711739,"teacher_disagreement_score":0.22127767,"about_ca_system_score_codex":0.00004644576,"about_ca_system_score_gemma":0.0000061768487,"threshold_uncertainty_score":0.39025292},"labels":[],"label_agreement":null},{"id":"W2134230984","doi":"10.1109/ccece.2009.5090225","title":"Awater heater model for increased power system efficiency","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Water heater; Reliability (semiconductor); Power demand; Power (physics); Demand side; Water heating; Computer science; Reliability engineering; Engineering; Environmental science; Automotive engineering; Environmental economics; Power consumption; Mechanical engineering; Waste management","score_opus":0.006664434871368845,"score_gpt":0.1829172090787848,"score_spread":0.17625277420741597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134230984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14775698,0.000025299265,0.7722569,0.000110593595,0.00032681137,0.00025354547,0.0000030922438,0.0010489267,0.078217864],"genre_scores_gemma":[0.9947531,7.690079e-7,0.0035371582,0.00021196526,0.00004961733,0.00003139235,0.000006108634,0.00002109293,0.0013887532],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993743,0.0000039483944,0.00014386831,0.00013309898,0.000092700335,0.0002521049],"domain_scores_gemma":[0.9997002,0.000007866057,0.0000059326717,0.00021637042,0.000017387372,0.00005226486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008660702,0.000119757264,0.000110543595,0.000068089306,0.000029876832,0.000026644206,0.000106641804,0.000037933096,0.000034492245],"category_scores_gemma":[0.000001944902,0.00009686911,0.00005142238,0.00005544727,0.0000047556255,0.00006592771,0.000011461963,0.000028612683,0.000057256486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005800936,0.000014239396,0.000017354116,0.000034016844,0.000013820987,0.0000017503228,0.00005460226,0.9806697,0.0012126191,0.00640197,0.011481704,0.0000924258],"study_design_scores_gemma":[0.00029231008,0.000026228774,0.00020958533,0.000010275416,0.0000106855905,0.0000013039414,0.000018663317,0.9937153,0.003601837,0.000053712152,0.0019178169,0.00014232454],"about_ca_topic_score_codex":0.000006252192,"about_ca_topic_score_gemma":0.0000019413073,"teacher_disagreement_score":0.8469962,"about_ca_system_score_codex":0.00007592782,"about_ca_system_score_gemma":0.0000030263154,"threshold_uncertainty_score":0.39502075},"labels":[],"label_agreement":null},{"id":"W2135825244","doi":"10.1109/pes.2009.5275857","title":"The operation of a distribution company under uncertainty: An overview","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Task (project management); Computer science; Work (physics); Distribution (mathematics); Operations research; Power (physics); Risk analysis (engineering); Process management; Systems engineering; Business; Engineering","score_opus":0.026105112453288212,"score_gpt":0.25750701096273515,"score_spread":0.23140189850944692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135825244","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48269024,0.0027065368,0.48399222,0.003244906,0.0010601254,0.00054224505,0.000018436616,0.00096245337,0.024782823],"genre_scores_gemma":[0.99940324,0.00023460318,0.00008959507,0.00009479037,0.000037601047,0.0000035562712,0.00005359719,0.000003955177,0.00007905675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999644,0.0000143221705,0.00011227408,0.00005405519,0.00008664142,0.00008873963],"domain_scores_gemma":[0.9997707,0.000012672495,0.000009238974,0.00017015148,0.000017327146,0.000019887839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000096723044,0.000054142223,0.000057232573,0.000009252634,0.00004307707,0.000024466579,0.000079494166,0.000016484797,0.000024434548],"category_scores_gemma":[0.0000029949074,0.000037382855,0.000018670395,0.0000750805,0.000009899561,0.00008110017,0.000007602743,0.000027839898,0.000007660981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014697645,0.000010731099,0.000010451878,0.0000035586756,0.000008748352,9.438838e-8,0.000010740824,0.8502812,0.0003488243,0.14185317,0.0021671697,0.005303852],"study_design_scores_gemma":[0.00015230355,0.000049234743,0.031051997,0.000008927822,0.00001033131,4.8060735e-7,0.000088101835,0.94064283,0.000929647,0.0015021638,0.025478302,0.00008569462],"about_ca_topic_score_codex":0.000031817905,"about_ca_topic_score_gemma":0.00011143843,"teacher_disagreement_score":0.516713,"about_ca_system_score_codex":0.00005182774,"about_ca_system_score_gemma":0.000003291331,"threshold_uncertainty_score":0.15244286},"labels":[],"label_agreement":null},{"id":"W2137119781","doi":"10.1109/greentech.2013.14","title":"A Comfort Based Game Theoretic Approach for Load Management in the Smart Grid","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Scalability; Demand response; Load management; Grid; Overhead (engineering); Distributed computing; Energy management; Energy consumption; Load balancing (electrical power); Energy (signal processing); Reliability engineering; Simulation; Electricity; Engineering; Database","score_opus":0.009420207222165277,"score_gpt":0.18807335465697636,"score_spread":0.1786531474348111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137119781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0129057085,0.000055816894,0.49761394,0.0004551483,0.00040866405,0.002216501,0.0000024941246,0.00037100192,0.48597074],"genre_scores_gemma":[0.97646433,0.000016465356,0.01868777,0.0010334438,0.000099325465,0.0026366764,0.000032320582,0.000041628933,0.0009880317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999034,0.000023526352,0.00019909976,0.00018435644,0.0002249989,0.0003340572],"domain_scores_gemma":[0.9994295,0.000061320425,0.000012824808,0.00044690332,0.000015488298,0.000033934728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003756519,0.00016558493,0.00012685468,0.000093753115,0.000026871723,0.000069897906,0.00035904197,0.000035546167,0.00021165653],"category_scores_gemma":[0.0000051070465,0.00011388244,0.00006699411,0.00019410765,0.000030404071,0.000078126235,0.000042596326,0.00007836526,0.000063147454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000989694,0.00012901226,0.0004653796,0.00029116435,0.000106858,0.0000044329595,0.00019734916,0.76794887,0.000017631317,0.13426043,0.09308901,0.0034799858],"study_design_scores_gemma":[0.00080027455,0.000026970894,0.004639745,0.0000094377765,0.000028557348,9.264659e-7,0.00039373199,0.931583,0.00009328671,0.00124994,0.060953602,0.00022056454],"about_ca_topic_score_codex":0.000057688023,"about_ca_topic_score_gemma":0.000018009769,"teacher_disagreement_score":0.9635586,"about_ca_system_score_codex":0.000096509066,"about_ca_system_score_gemma":0.0000041912335,"threshold_uncertainty_score":0.4643991},"labels":[],"label_agreement":null},{"id":"W2138320691","doi":"","title":"Reactive power control in distribution systems by using advanced techniques","year":2011,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"AC power; Control (management); Power (physics); Reliability engineering; Voltage; Computer science; Engineering; Electrical engineering","score_opus":0.007732979306857924,"score_gpt":0.1967977557125738,"score_spread":0.18906477640571587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138320691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1921288,0.0012464682,0.8004853,0.000063664695,0.00033625565,0.0010906826,0.00013960843,0.0020222396,0.0024869689],"genre_scores_gemma":[0.9911675,0.00009276475,0.0077052847,0.00016211654,0.00005275285,0.0005780182,0.000059144117,0.0001077626,0.00007465843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979781,0.00009475123,0.00053719693,0.0003801766,0.00026416924,0.00074559444],"domain_scores_gemma":[0.99895835,0.00004427799,0.00012289875,0.0006300255,0.000069624366,0.00017480127],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045467046,0.00039637586,0.00042208724,0.00032304256,0.00007882356,0.00006831773,0.00035172162,0.00028088887,0.000018333181],"category_scores_gemma":[0.00005045976,0.00044012608,0.000097243326,0.0005045363,0.000054293607,0.00050768786,0.00007844741,0.00038251837,0.000007633948],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084338593,0.0014025026,0.07832753,0.0004174067,0.0007741513,0.000563725,0.0017547258,0.42735037,0.39153394,0.039240357,0.030088067,0.027703824],"study_design_scores_gemma":[0.0013029738,0.00020196218,0.016870162,0.0002633368,0.00007110146,0.00006863677,0.00042705433,0.8765513,0.08993332,0.00036595648,0.012686382,0.0012578578],"about_ca_topic_score_codex":0.006742916,"about_ca_topic_score_gemma":0.00037864246,"teacher_disagreement_score":0.7990387,"about_ca_system_score_codex":0.001487974,"about_ca_system_score_gemma":0.000034735767,"threshold_uncertainty_score":0.99987125},"labels":[],"label_agreement":null},{"id":"W2140383608","doi":"10.1002/pip.2302","title":"Empirical assessment of short‐term variability from utility‐scale solar PV plants","year":2012,"lang":"en","type":"article","venue":"Progress in Photovoltaics Research and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Metric (unit); Environmental science; Dispersion (optics); Reliability (semiconductor); Scale (ratio); Grid; Aggregate (composite); Term (time); Power station; Power (physics); Mathematics; Engineering; Geography; Electrical engineering; Cartography; Physics","score_opus":0.06764243321182047,"score_gpt":0.3890760588804786,"score_spread":0.32143362566865813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140383608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97612953,0.000949887,0.016189512,0.0000433472,0.00007813303,0.0010856062,0.00017909761,0.00010827325,0.005236592],"genre_scores_gemma":[0.9940411,0.00026482777,0.003662369,0.0000047382377,0.00012813362,0.0017686526,0.00009901382,0.000021264006,0.000009921209],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983141,0.00010242302,0.0003237208,0.00027744472,0.00045157943,0.0005307211],"domain_scores_gemma":[0.99883074,0.00030133905,0.000018627072,0.0005534279,0.00008047715,0.00021540305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012705554,0.00013171001,0.00020182741,0.00016074735,0.00009310987,0.000038995793,0.0002842148,0.000098130084,0.000056254543],"category_scores_gemma":[0.000017435064,0.00013194191,0.000028516923,0.00039928843,0.00029006688,0.00013579913,0.0002534903,0.00040058288,0.0000042940587],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008153695,0.0005175052,0.9818007,0.000105850886,0.000034112625,6.832103e-7,0.00015191484,0.00009175731,0.0010263553,0.00038635204,0.0003545609,0.015522088],"study_design_scores_gemma":[0.00024053307,0.00003066937,0.92286295,0.000027731407,0.000008298396,8.450213e-7,0.0001275223,0.042365216,0.008623861,0.002273612,0.023266718,0.00017206951],"about_ca_topic_score_codex":0.000051903324,"about_ca_topic_score_gemma":0.000043451993,"teacher_disagreement_score":0.05893774,"about_ca_system_score_codex":0.00011304169,"about_ca_system_score_gemma":0.000030372956,"threshold_uncertainty_score":0.5380435},"labels":[],"label_agreement":null},{"id":"W2141622557","doi":"10.1109/ptc.2003.1304159","title":"Determination and allocation of typical load profiles to the eligible consumers","year":2004,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fuzzy logic; Cluster analysis; Computer science; Quarter (Canadian coin); Artificial neural network; Load profile; Load balancing (electrical power); Operations research; Machine learning; Artificial intelligence; Engineering; Mathematics; Electrical engineering","score_opus":0.007288216952336371,"score_gpt":0.21075231342089923,"score_spread":0.20346409646856287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141622557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9255604,0.000083233084,0.065059446,0.0009087599,0.00016267909,0.00020010666,6.528175e-7,0.00010156118,0.007923166],"genre_scores_gemma":[0.9964772,0.000023405262,0.0033170045,0.000050397415,0.000014302624,0.00001794765,0.0000011568485,0.000005060233,0.00009354249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997528,0.0000032349853,0.000068126974,0.000049074828,0.00007202163,0.000054744898],"domain_scores_gemma":[0.99986845,0.000010091848,0.0000056631434,0.00007927559,0.00001947247,0.000017020242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058095753,0.000037317648,0.0000360039,0.000026085809,0.000012445782,0.000007385282,0.00003946596,0.000014301226,0.00001107702],"category_scores_gemma":[0.000010903402,0.000027325159,0.000006771855,0.000067356916,0.0000119199385,0.00003400493,0.000015877471,0.000017213983,0.000018096625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014345831,0.00002259065,0.0011911915,0.00009411314,0.00004070932,8.981063e-7,0.00060175237,0.92454845,0.009690421,0.026185477,0.002757737,0.034852337],"study_design_scores_gemma":[0.001570387,0.000192403,0.2182144,0.0001193565,0.00008329425,0.0000096592585,0.00074888876,0.21643606,0.5012744,0.001987346,0.058789287,0.0005745333],"about_ca_topic_score_codex":0.00003577803,"about_ca_topic_score_gemma":0.00011005308,"teacher_disagreement_score":0.70811236,"about_ca_system_score_codex":0.00003709488,"about_ca_system_score_gemma":0.0000058104392,"threshold_uncertainty_score":0.11142876},"labels":[],"label_agreement":null},{"id":"W2141692617","doi":"10.1109/jsac.2012.120706","title":"Optimized Day-Ahead Pricing for Smart Grids with Device-Specific Scheduling Flexibility","year":2012,"lang":"en","type":"article","venue":"IEEE Journal on Selected Areas in Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":211,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Electricity; Purchasing; Smart grid; Scheduling (production processes); Dynamic pricing; Minification; Flexibility (engineering); Electricity pricing; Real-time computing; Mathematical optimization; Electricity market; Microeconomics; Economics; Operations management","score_opus":0.05627182290679464,"score_gpt":0.289451121055801,"score_spread":0.23317929814900637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141692617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56794703,0.0033380766,0.41575128,0.0012024977,0.0017778202,0.0011093402,0.000015363867,0.0006822583,0.008176352],"genre_scores_gemma":[0.8775174,0.00080092665,0.12101693,0.00007970669,0.00031537056,0.00014374546,0.000028524582,0.000067755536,0.000029609217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982338,0.00021914265,0.0005721144,0.00016339286,0.00025047024,0.00056106324],"domain_scores_gemma":[0.9975037,0.00070073525,0.00012866332,0.0012234399,0.0002560877,0.00018736073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011365674,0.00025045263,0.00031040225,0.00035815185,0.00037930082,0.00010315603,0.0007984781,0.00009268475,0.000021746046],"category_scores_gemma":[0.00012975415,0.00023094862,0.00007684188,0.0009193421,0.00005969433,0.00039525828,0.000062938554,0.00085397257,0.000015103106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097970194,0.0003422322,0.0055243094,0.000030152078,0.00017528477,0.0000014481598,0.00053790654,0.9870919,0.0010110927,0.0012005743,0.0011864495,0.0028006693],"study_design_scores_gemma":[0.0073334444,0.00040550652,0.08252796,0.0012886197,0.00024848874,0.00019589848,0.0007584222,0.76055163,0.0081405435,0.00055555097,0.13621868,0.0017752572],"about_ca_topic_score_codex":0.0000098594455,"about_ca_topic_score_gemma":0.00007853425,"teacher_disagreement_score":0.30957043,"about_ca_system_score_codex":0.0006076303,"about_ca_system_score_gemma":0.000056087567,"threshold_uncertainty_score":0.9417811},"labels":[],"label_agreement":null},{"id":"W2143298176","doi":"10.1109/surv.2014.020614.00115","title":"Stochastic Information Management in Smart Grid","year":2014,"lang":"en","type":"article","venue":"IEEE Communications Surveys & Tutorials","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Demand response; Electric power system; Energy management; Grid; Electricity; Distributed computing; Power (physics); Engineering; Electrical engineering; Energy (signal processing)","score_opus":0.02090354454878333,"score_gpt":0.24191402828860137,"score_spread":0.22101048373981805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143298176","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027170738,0.0002718871,0.8286317,0.00048852357,0.019928575,0.0013834791,0.00004608284,0.0014360234,0.120643005],"genre_scores_gemma":[0.9948565,0.0002194842,0.0038461292,0.00006553301,0.00033352242,0.0003467697,0.00019047073,0.000031401112,0.00011021711],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99815416,0.0006254406,0.00059007265,0.000119371136,0.0002304828,0.00028046095],"domain_scores_gemma":[0.9974919,0.0003797662,0.000071629445,0.0019319017,0.00006388836,0.000060901897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003076733,0.0001840649,0.0002315262,0.00036176282,0.000103206236,0.00008801178,0.00095429993,0.00007198283,0.000024362073],"category_scores_gemma":[0.00011644899,0.00021272815,0.000046736342,0.0004938944,0.00006007527,0.0004872791,0.00020386935,0.00016675267,0.00042068615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005452804,0.000088640336,0.00041992957,0.000089186,0.00011731216,6.027159e-7,0.00047755108,0.92739743,0.00018112911,0.021755807,0.016161345,0.033305623],"study_design_scores_gemma":[0.001710807,0.00003912752,0.04441944,0.00012034492,0.00007295353,0.0000020266673,0.00016502633,0.17470141,0.00035576362,0.0019423274,0.77562284,0.0008479047],"about_ca_topic_score_codex":0.00015158806,"about_ca_topic_score_gemma":0.00040677862,"teacher_disagreement_score":0.96768576,"about_ca_system_score_codex":0.00020972447,"about_ca_system_score_gemma":0.000009410952,"threshold_uncertainty_score":0.8674802},"labels":[],"label_agreement":null},{"id":"W2144135680","doi":"10.1109/saso.2008.64","title":"Load Shifting Agents for Automated Demand Side Management in Micro Energy Grids","year":2008,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bidding; Computer science; Automation; Grid; Energy management; Smart grid; Energy market; Process (computing); Negotiation; Load management; Energy (signal processing); Electricity; Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.014527955268440003,"score_gpt":0.2170407692740991,"score_spread":0.2025128140056591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144135680","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61363,0.00053199625,0.13962938,0.00018893994,0.0019777294,0.0008058064,0.0000072681523,0.005428579,0.2378003],"genre_scores_gemma":[0.97726566,0.00028663137,0.016737536,0.00030912078,0.00011885182,0.00021008131,0.000025666817,0.000075617674,0.0049708625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998782,0.00001332307,0.00032356614,0.00025327606,0.00018497674,0.00044290465],"domain_scores_gemma":[0.99961114,0.000032169693,0.000021965676,0.00025165637,0.000019617142,0.000063465806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014264151,0.0002067828,0.00018559775,0.0001950883,0.00006501394,0.00002161345,0.00019254729,0.00005939043,0.000047751444],"category_scores_gemma":[0.000007902678,0.00021877029,0.0000619252,0.00026558773,0.000016738415,0.000109531626,0.000095081756,0.000048647664,0.00003139992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013216265,0.000054841614,0.001345141,0.00014356404,0.00021861117,0.00016375151,0.00016063602,0.9138436,0.0006992117,0.0030454064,0.077676535,0.0026354862],"study_design_scores_gemma":[0.0016950805,0.000024637113,0.026599307,0.000047600955,0.000030004167,0.000009785186,0.000072775816,0.8184843,0.007367208,0.00014104591,0.14503983,0.00048841996],"about_ca_topic_score_codex":0.00012353105,"about_ca_topic_score_gemma":0.00019914324,"teacher_disagreement_score":0.36363563,"about_ca_system_score_codex":0.00025986618,"about_ca_system_score_gemma":0.00000710996,"threshold_uncertainty_score":0.89211935},"labels":[],"label_agreement":null},{"id":"W2150693779","doi":"10.1109/naps.2015.7335103","title":"An autonomous system via fuzzy logic for residential peak load management in smart grids","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; HVAC; Demand response; Computer science; Smart grid; Thermal comfort; Load management; Energy consumption; Automotive engineering; Simulation; Energy management; Air conditioning; Electricity; Peak demand; Real-time computing; Fuzzy logic; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.018227114702603936,"score_gpt":0.23155551377492378,"score_spread":0.21332839907231985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150693779","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061809447,0.0003154479,0.40067124,0.00022384708,0.0065021017,0.0020208934,0.000008381378,0.0032592649,0.5251894],"genre_scores_gemma":[0.98836964,0.0000080077225,0.008944637,0.00006914516,0.00033191676,0.00033461515,0.000027356185,0.00006237481,0.0018522807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853325,0.00003180992,0.00036988233,0.00032864834,0.00029429095,0.00044211923],"domain_scores_gemma":[0.99923575,0.000013199139,0.000026946635,0.0005186425,0.000048413902,0.00015701914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005651769,0.00022734563,0.00022897261,0.00022153454,0.000033474433,0.000077379205,0.000337056,0.00007729608,0.000021406075],"category_scores_gemma":[0.0000058258665,0.00022953193,0.0000596975,0.00020602341,0.000015231316,0.00021831424,0.000097312695,0.00007593617,0.00015610116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005717118,0.00008716984,0.00039621757,0.0005012684,0.00016966515,0.00013328821,0.00023204785,0.9008027,0.00015189318,0.06194325,0.031580232,0.003945122],"study_design_scores_gemma":[0.003831836,0.00031024136,0.007872615,0.00008104419,0.00013067457,0.000019812735,0.0025549922,0.91179156,0.0008075194,0.0022533652,0.069307685,0.0010386305],"about_ca_topic_score_codex":0.00027187294,"about_ca_topic_score_gemma":0.00072528736,"teacher_disagreement_score":0.9265602,"about_ca_system_score_codex":0.0009084397,"about_ca_system_score_gemma":0.000017925533,"threshold_uncertainty_score":0.93600404},"labels":[],"label_agreement":null},{"id":"W2150787","doi":"10.1139/y90-235","title":"Examining the potential of Advanced Electricity Metering in New Zealand","year":2011,"lang":"en","type":"dissertation","venue":"Canadian Journal of Physiology and Pharmacology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metering mode; Electricity; Engineering; Electrical engineering; Telecommunications; Mechanical engineering","score_opus":0.011975446473980907,"score_gpt":0.22922024937570307,"score_spread":0.21724480290172216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944406,0.001994267,0.000014675189,0.000017231047,0.002967846,0.00007400089,0.0000027904578,0.0000039101533,0.00048468905],"genre_scores_gemma":[0.9985677,0.000647877,0.000054960692,0.00005002211,0.00029527524,0.0000031327538,0.000012019561,0.00001933418,0.00034965572],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99921066,0.000072651776,0.0003314162,0.00009546858,0.00003708976,0.00025270155],"domain_scores_gemma":[0.99953216,0.000052629264,0.00017289334,0.000061698935,0.000038073107,0.0001425428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014317814,0.00014591111,0.00034545205,0.0003610463,0.00003390835,0.0000033233719,0.00020838936,0.00015364411,0.00032558394],"category_scores_gemma":[0.000009429658,0.00012543703,0.000045642326,0.00011974844,0.000042240405,0.00005366164,0.000006660162,0.00046228396,7.958349e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018253848,0.000008258585,0.00047343015,0.00019207591,0.00047629897,0.00010514572,0.001171541,0.06996089,0.9154362,0.000054320037,0.004770122,0.0071691754],"study_design_scores_gemma":[0.0046643117,0.0011279655,0.48489928,0.00030481993,0.0010613429,0.00017800265,0.0009264107,0.0028646353,0.4766153,0.003881752,0.022476014,0.0010001666],"about_ca_topic_score_codex":0.0013832441,"about_ca_topic_score_gemma":0.011058463,"teacher_disagreement_score":0.48442584,"about_ca_system_score_codex":0.00004627199,"about_ca_system_score_gemma":0.000280501,"threshold_uncertainty_score":0.6170882},"labels":[],"label_agreement":null},{"id":"W2151232840","doi":"10.1109/ccece.2003.1226462","title":"Distribution system planning using distributed generation","year":2004,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deregulation; Installation; Distributed generation; Electric utility; Computer science; Electricity; Distributed power generation; Electric power industry; Distribution (mathematics); Electric power system; Digital signal processing; Electricity market; Electric power distribution; Risk analysis (engineering); Telecommunications; Business; Power (physics); Engineering; Electrical engineering; Economics; Renewable energy","score_opus":0.022945626441227454,"score_gpt":0.21508553856404275,"score_spread":0.19213991212281528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151232840","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31831914,0.00003733947,0.67953545,0.000011945667,0.00049628183,0.00005222429,0.00001467964,0.00058758096,0.0009453607],"genre_scores_gemma":[0.99750465,0.0000014677505,0.0016670836,0.000007740384,0.00027358404,0.000008355774,0.000512627,0.000015882857,0.000008623892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994585,0.0000061798837,0.00014446705,0.00010403842,0.00011890778,0.00016789441],"domain_scores_gemma":[0.999797,0.0000032228436,0.0000135586715,0.00012932645,0.00001731982,0.000039609957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066204164,0.000097013995,0.0000777516,0.000029700994,0.00006971023,0.000047593276,0.00005967267,0.00004038351,0.0000075143284],"category_scores_gemma":[0.0000040659515,0.00009902384,0.0000243983,0.00015130053,0.0000063728994,0.000120807854,0.000019546207,0.00004447847,0.000021802181],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.784292e-7,0.0000034955124,0.00010353262,0.000022917291,0.000017558874,0.0000072444664,0.0000122138235,0.98579586,0.0042649456,0.008981649,0.0007290547,0.000060944945],"study_design_scores_gemma":[0.00026759895,0.000006546403,0.0011294978,0.00003920043,0.000017841858,0.000009994025,0.00008566359,0.9792957,0.016416768,0.000016019341,0.0025577035,0.00015751632],"about_ca_topic_score_codex":0.000039727674,"about_ca_topic_score_gemma":0.0000046837386,"teacher_disagreement_score":0.6791855,"about_ca_system_score_codex":0.00062325445,"about_ca_system_score_gemma":0.000006045052,"threshold_uncertainty_score":0.4038075},"labels":[],"label_agreement":null},{"id":"W2151291650","doi":"10.1109/ccece.1996.548118","title":"Application of fuzzy logic to electricity pricing in a deregulated environment","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"","keywords":"Fuzzy logic; Electricity; Computer science; Electric power system; Electricity pricing; Mathematical optimization; Operations research; Power (physics); Electricity market; Engineering; Electrical engineering; Artificial intelligence; Mathematics","score_opus":0.008032390074284124,"score_gpt":0.170262450773076,"score_spread":0.16223006069879187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151291650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50116503,0.00013971122,0.4624759,0.00017965726,0.000040773906,0.00039432282,3.219494e-7,0.00021472092,0.035389587],"genre_scores_gemma":[0.9962315,0.000033732482,0.003485967,0.00004981291,0.000011474927,0.00003926589,0.0000011970918,0.000010223503,0.00013683386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995121,0.0000060455427,0.00015219023,0.0001055673,0.0000874641,0.00013666917],"domain_scores_gemma":[0.9997891,0.00000907041,0.000011358387,0.00016112615,0.0000030696872,0.000026232448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052926884,0.00006798618,0.00008485056,0.00012439203,0.0000066168523,0.0000028386678,0.000071325536,0.00002641396,0.00009030769],"category_scores_gemma":[0.0000033153074,0.00006903583,0.000013540943,0.00027196633,0.0000038627823,0.000025761288,0.000023282999,0.000035087716,0.00008959685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.090252e-7,0.000030265168,0.0010701161,0.000013587656,0.000008033977,5.548052e-7,0.000055292443,0.9740492,0.013025506,0.0013375166,0.00038666572,0.010022337],"study_design_scores_gemma":[0.0001908307,0.000028560513,0.038442515,0.0000058564224,0.000005429146,5.236722e-7,0.000013316701,0.9352893,0.022223033,0.00024945228,0.0034135305,0.00013762887],"about_ca_topic_score_codex":0.00004783697,"about_ca_topic_score_gemma":0.000016807007,"teacher_disagreement_score":0.4950665,"about_ca_system_score_codex":0.00011962148,"about_ca_system_score_gemma":3.7534952e-7,"threshold_uncertainty_score":0.28151992},"labels":[],"label_agreement":null},{"id":"W2152729742","doi":"10.1109/ccece.2000.849684","title":"Feasibility study of a cogeneration plant for University of Calgary","year":2002,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Deregulation; Liberian dollar; Electricity; Collateral; Power station; Profit (economics); Environmental economics; Business; Economics; Engineering; Finance; Electricity generation; Power (physics); Electrical engineering","score_opus":0.03404710627244131,"score_gpt":0.18597575603750524,"score_spread":0.15192864976506393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152729742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94963825,0.000015211418,0.04558935,0.0000045200986,0.00007832031,0.00027840454,0.0000051717716,0.00004729636,0.004343503],"genre_scores_gemma":[0.9986992,0.0000061073697,0.0010234003,0.0000018414429,0.000008071182,0.0000010690013,0.000004175362,0.0000036469573,0.00025249092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997595,0.000007591095,0.00007432313,0.000058843285,0.000053439213,0.00004629644],"domain_scores_gemma":[0.99982715,0.00001376739,0.000011795445,0.00011750322,0.000017447406,0.00001234633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004961516,0.00003538033,0.00007305341,0.000026728756,0.000011857772,9.647698e-7,0.000045985475,0.000013434483,0.00009496529],"category_scores_gemma":[0.0000033010301,0.000037496065,0.000018491728,0.000046754638,0.0000061313185,0.000026541305,0.000013779805,0.000011694762,0.0000012329658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107206644,0.0019923903,0.051193327,0.00040371227,0.00045468827,0.000007656408,0.0029447863,0.8935179,0.0065753106,0.004344912,0.031452738,0.0070053563],"study_design_scores_gemma":[0.0013776014,0.00020377735,0.021639049,0.000004296024,0.00004063581,2.2063068e-7,0.000662725,0.9703926,0.0034593788,0.000013200775,0.002120101,0.000086412336],"about_ca_topic_score_codex":0.000116738265,"about_ca_topic_score_gemma":0.0005390928,"teacher_disagreement_score":0.07687469,"about_ca_system_score_codex":0.000023271225,"about_ca_system_score_gemma":8.899946e-7,"threshold_uncertainty_score":0.15290451},"labels":[],"label_agreement":null},{"id":"W2153311188","doi":"10.1109/icassp.2013.6638664","title":"Online control for energy storage management with renewable energy integration","year":2013,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Renewable energy; Computer science; Energy storage; Lyapunov optimization; Energy management; Control (management); Mathematical optimization; Optimization problem; Energy (signal processing); Engineering; Electrical engineering; Power (physics); Lyapunov equation; Algorithm; Mathematics","score_opus":0.004952601329453686,"score_gpt":0.16962347231514865,"score_spread":0.16467087098569497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153311188","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010834252,0.000067894194,0.95442545,0.00017937066,0.00030646496,0.00022527101,0.000006402429,0.0004936914,0.04321204],"genre_scores_gemma":[0.9454046,0.00008976088,0.022118859,0.00074381474,0.00024446857,0.00096100237,0.00016138806,0.00008002412,0.030196093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909854,0.000011538156,0.00020535337,0.00021938905,0.00015644151,0.00030871385],"domain_scores_gemma":[0.99949014,0.000029912904,0.00002657748,0.00031645168,0.00006048157,0.00007644182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000051053532,0.00021066064,0.0001756672,0.0001450286,0.0000456427,0.0000654235,0.00015720639,0.00004787496,0.00027430098],"category_scores_gemma":[0.0000023447078,0.00016709711,0.00004671327,0.00015404624,0.000014860556,0.00021669363,0.00002506191,0.000031582404,0.000011842645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013633433,0.000054247408,0.000011316201,0.00002847406,0.00020061444,0.0000029283226,0.000008811938,0.8614649,0.00042806126,0.027084729,0.09740052,0.013301748],"study_design_scores_gemma":[0.0012408671,0.000101503385,0.00031893604,0.000022733393,0.00005077058,0.0000012305454,0.00012754215,0.7716036,0.002648618,0.00075864035,0.2228422,0.000283376],"about_ca_topic_score_codex":0.0018702481,"about_ca_topic_score_gemma":0.0031615344,"teacher_disagreement_score":0.94432116,"about_ca_system_score_codex":0.000109849,"about_ca_system_score_gemma":0.00000412938,"threshold_uncertainty_score":0.68140227},"labels":[],"label_agreement":null},{"id":"W2156117786","doi":"10.1109/infcomw.2011.5928828","title":"Stochastic unit commitment in smart grid communications","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Renewable energy; Computer science; Power system simulation; Grid; Distributed computing; Scheduling (production processes); Demand response; Hidden Markov model; Mathematical optimization; Electric power system; Real-time computing; Power (physics); Electrical engineering; Engineering; Electricity; Artificial intelligence; Mathematics","score_opus":0.062398080647370804,"score_gpt":0.22934071702179512,"score_spread":0.1669426363744243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156117786","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061979502,0.00030222023,0.07159163,0.00028459905,0.0012730771,0.00045889983,0.0000057622287,0.0010605052,0.8630438],"genre_scores_gemma":[0.9949068,0.00003620084,0.0044421684,0.00008191443,0.000021630458,0.00008375322,0.000013909697,0.000019899868,0.00039376918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952894,0.000018369874,0.00015322954,0.00007302198,0.000065900684,0.0001605216],"domain_scores_gemma":[0.9992181,0.000028749924,0.0000081529315,0.00069396495,0.000009842326,0.000041189483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000092477894,0.000088605084,0.000083613166,0.00011355462,0.000026548176,0.0000076174933,0.00034746015,0.000024857682,0.00033424163],"category_scores_gemma":[0.000004819097,0.00009077902,0.000018889676,0.00017012875,0.000027653685,0.000060426057,0.00014153832,0.00009657244,0.00022449535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001743276,0.0007263318,0.03308654,0.00009490426,0.0003352192,0.00002871671,0.0032593035,0.6648087,0.00017363364,0.24902762,0.04118476,0.007256856],"study_design_scores_gemma":[0.0014623415,0.00009239164,0.2650437,0.00008351664,0.00005618291,0.0000064089922,0.0010757117,0.59553325,0.00080849306,0.0020713874,0.13287637,0.000890217],"about_ca_topic_score_codex":0.00025019332,"about_ca_topic_score_gemma":0.0014378591,"teacher_disagreement_score":0.93292725,"about_ca_system_score_codex":0.00005595944,"about_ca_system_score_gemma":0.0000035181076,"threshold_uncertainty_score":0.3701861},"labels":[],"label_agreement":null},{"id":"W2156762285","doi":"10.1504/ijret.2014.059661","title":"Decentralised operation of residential energy resources in the smart grid","year":2014,"lang":"en","type":"article","venue":"International Journal of Renewable Energy Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distributed generation; Smart grid; Demand response; Grid; Computer science; Energy storage; Electricity; Electric power system; Adaptation (eye); Reliability engineering; Control (management); Distributed computing; Distributed power; Environmental economics; Power (physics); Renewable energy; Engineering; Electrical engineering","score_opus":0.003654961029891317,"score_gpt":0.1933894308454646,"score_spread":0.18973446981557326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156762285","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6006603,0.0021914772,0.35774463,0.0075112553,0.010352654,0.00009303035,0.000009456229,0.00024427322,0.021192908],"genre_scores_gemma":[0.9977185,0.00058653037,0.0008785466,0.00015342941,0.0005049355,0.000008215061,0.000007371283,0.00001854353,0.00012392233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985642,0.00008094253,0.00059898716,0.00011044034,0.00046119568,0.00018424093],"domain_scores_gemma":[0.9992913,0.00008439887,0.00019981337,0.00021991837,0.0001778126,0.000026758664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040912657,0.00012894352,0.0002167042,0.0008997012,0.000023373987,0.000038619437,0.0010243942,0.00012692703,0.000044238648],"category_scores_gemma":[0.000099210876,0.000104345374,0.00007950344,0.00031720428,0.000074202966,0.00016281726,0.00007736858,0.00013320292,8.990648e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045293535,0.000049834365,0.0014620365,0.0000050775957,0.00015082915,0.00004173258,0.000072270086,0.9534933,0.006190694,0.022508861,0.00995721,0.0060228454],"study_design_scores_gemma":[0.0018765776,0.00024111391,0.0020879225,0.00014741313,0.00004477559,0.00024608063,0.00032776955,0.058994927,0.14672777,0.010956981,0.7780748,0.00027385633],"about_ca_topic_score_codex":0.00097220147,"about_ca_topic_score_gemma":0.0023195653,"teacher_disagreement_score":0.8944984,"about_ca_system_score_codex":0.00010083564,"about_ca_system_score_gemma":0.000021800477,"threshold_uncertainty_score":0.42550808},"labels":[],"label_agreement":null},{"id":"W2161287865","doi":"10.1109/isie.2011.5984354","title":"Peak-load shaving in smart homes via online scheduling","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Peaking power plant; Computer science; Smart grid; Scheduling (production processes); Distributed computing; Load management; Architecture; Load balancing (electrical power); Grid; Energy management system; Electric power system; Real-time computing; Energy management; Power (physics); Energy (signal processing); Engineering","score_opus":0.020519279163192516,"score_gpt":0.20076830906798832,"score_spread":0.1802490299047958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161287865","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87196726,0.00029910522,0.038466062,0.00003472231,0.00086640654,0.000114030736,0.0000011577,0.00082885363,0.08742243],"genre_scores_gemma":[0.97888565,0.000051542353,0.020340815,0.00007431131,0.00010038293,0.000012695558,0.000006676759,0.000039964092,0.00048795785],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991786,0.0000091931,0.00021638339,0.00016717352,0.00013801084,0.0002906752],"domain_scores_gemma":[0.9996564,0.00001383191,0.000012271758,0.00024465867,0.000017049117,0.000055817607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013685232,0.00014586547,0.00014206088,0.00014631753,0.000018180272,0.000014356936,0.00017287079,0.00005012356,0.00054143026],"category_scores_gemma":[0.000015011253,0.00014798723,0.00003728461,0.00021760706,0.000012028227,0.00015076455,0.00008445804,0.00012788111,0.00011876936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027447826,0.00044369226,0.11747662,0.00032658002,0.00026553895,0.00022276308,0.003324439,0.8224646,0.008343581,0.00641724,0.0025488646,0.038138654],"study_design_scores_gemma":[0.0009195463,0.000043552944,0.23068222,0.000119642056,0.000028875384,0.000007908625,0.00062064,0.75175935,0.0070438725,0.00082137005,0.0071302317,0.00082281104],"about_ca_topic_score_codex":0.0004899233,"about_ca_topic_score_gemma":0.0014184181,"teacher_disagreement_score":0.1132056,"about_ca_system_score_codex":0.00012440477,"about_ca_system_score_gemma":0.0000073956912,"threshold_uncertainty_score":0.6034744},"labels":[],"label_agreement":null},{"id":"W2162144622","doi":"10.1109/tpwrs.2014.2340881","title":"A Dynamic Water-Filling Method for Real-Time HVAC Load Control Based on Model Predictive Control","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"HVAC; Demand response; Model predictive control; Computer science; Control theory (sociology); Load regulation; Air conditioning; Process (computing); Renewable energy; Load management; Work (physics); Power (physics); Control engineering; Control (management); Engineering; Electricity; Artificial intelligence","score_opus":0.005185330047122007,"score_gpt":0.2092291637268083,"score_spread":0.2040438336796863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162144622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00062954944,0.000013997552,0.9901998,0.000097701886,0.002686305,0.0013636849,0.00029013396,0.00089383486,0.00382498],"genre_scores_gemma":[0.9944372,0.000004557702,0.0030563965,0.0001088187,0.00003861756,0.0012998482,0.000011019295,0.0001404129,0.00090308173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979315,0.00016545717,0.00048867357,0.000455091,0.00040993266,0.00054938113],"domain_scores_gemma":[0.9986275,0.00043845497,0.000055852455,0.00060618995,0.00012382887,0.00014816306],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00081971806,0.0003992495,0.0005470997,0.00027502773,0.00016161885,0.0000717848,0.00021902849,0.00018149638,0.00002617271],"category_scores_gemma":[0.0000070583164,0.00034714388,0.0002580718,0.00011039188,0.000021221342,0.0001238283,6.061326e-7,0.00021538374,0.00010353217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028865368,0.0000827952,4.4216603e-7,0.00010902866,0.00031799058,0.0000014344096,0.00013250175,0.98719114,0.01134395,0.00005874932,0.00035738698,0.00011593822],"study_design_scores_gemma":[0.0036722105,0.00037640225,0.0000029839266,0.00012475764,0.00020822207,0.0000021084147,0.00002843276,0.9905846,0.0035602993,0.000024277546,0.0010536133,0.00036210354],"about_ca_topic_score_codex":0.000071149814,"about_ca_topic_score_gemma":0.000016044603,"teacher_disagreement_score":0.9938077,"about_ca_system_score_codex":0.00053368794,"about_ca_system_score_gemma":0.000026005522,"threshold_uncertainty_score":0.9998981},"labels":[],"label_agreement":null},{"id":"W2162234386","doi":"10.1109/ccnc.2011.5766363","title":"Sensor network web services for Demand-Side Energy Management applications in the smart grid","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Smart grid; Wireless sensor network; Sensor web; Home automation; Embedded system; Web service; Computer network; Distributed computing; Database; Key distribution in wireless sensor networks; Wireless; Operating system; Wireless network; World Wide Web; Engineering; Electrical engineering","score_opus":0.011447059185905606,"score_gpt":0.18815070296050287,"score_spread":0.17670364377459727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162234386","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011549531,0.0005079658,0.39574805,0.00037295898,0.0012349074,0.0016293839,0.000012109467,0.0009805452,0.58796453],"genre_scores_gemma":[0.9647272,0.000503775,0.02625327,0.0014776421,0.00084147404,0.0037827108,0.00009248293,0.000085645515,0.0022357474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991286,0.000019934787,0.00021720282,0.00019075815,0.00011308819,0.0003304222],"domain_scores_gemma":[0.9994494,0.00005342139,0.000020891612,0.00042820798,0.000012983592,0.000035148423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020900385,0.00015944603,0.0001184057,0.00007984831,0.00007347765,0.000028526036,0.0003613916,0.000040038576,0.00005095316],"category_scores_gemma":[4.96456e-7,0.000120301804,0.000055511184,0.0002741029,0.000012157854,0.00007094547,0.000065788794,0.000046645728,0.000026533673],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001763027,0.000117099866,0.0045476886,0.00039841273,0.000332795,0.000011718977,0.00054515235,0.5663895,0.00003662024,0.37393788,0.050230324,0.0034351528],"study_design_scores_gemma":[0.00038010438,0.000018361503,0.014533347,0.000020985837,0.00006838259,0.0000016413644,0.0006136381,0.11488222,0.00021264989,0.002903547,0.8660823,0.00028283137],"about_ca_topic_score_codex":0.00012031041,"about_ca_topic_score_gemma":0.0013865534,"teacher_disagreement_score":0.95317775,"about_ca_system_score_codex":0.00003384599,"about_ca_system_score_gemma":0.000002197045,"threshold_uncertainty_score":0.4905765},"labels":[],"label_agreement":null},{"id":"W2163645342","doi":"10.1145/2018536.2018544","title":"Markovian models for home electricity consumption","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Representativeness heuristic; Markov process; Electricity; Computer science; Sizing; Energy consumption; Transformer; Consumption (sociology); Electricity demand; Markov chain; Econometrics; Mathematical optimization; Reliability engineering; Operations research; Electricity generation; Statistics; Machine learning; Engineering; Mathematics; Voltage; Electrical engineering","score_opus":0.041974663609328625,"score_gpt":0.19753795991652584,"score_spread":0.15556329630719723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163645342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063165754,0.000054766282,0.8538472,0.000008473891,0.00034181835,0.00017690785,0.0000020649904,0.0005803682,0.08182263],"genre_scores_gemma":[0.9873177,0.000052088064,0.011665851,0.000051467396,0.000047143487,0.000067868445,0.0000052912624,0.00002218496,0.0007704513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959093,0.0000036050212,0.00008971585,0.000091054324,0.000050701696,0.00017401924],"domain_scores_gemma":[0.9998019,0.000011995165,0.00000681803,0.00013131555,0.000012877396,0.000035149198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006470598,0.00007520683,0.00006842803,0.00006558242,0.000019815672,0.000007846756,0.000075602846,0.00003199756,0.00020222714],"category_scores_gemma":[0.0000020509078,0.000074854055,0.000031495776,0.00005368735,0.000006406853,0.000111652866,0.000012494738,0.000029726536,0.0000460573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000816168,0.00011663812,0.004001829,0.00037366385,0.00035626313,0.000006074513,0.000432486,0.57240784,0.0017447843,0.32161716,0.07535722,0.023504414],"study_design_scores_gemma":[0.00028381927,0.000026739304,0.005377582,0.0000032812484,0.000016727985,8.802665e-7,0.000006025831,0.97898537,0.005152421,0.0066898,0.003276552,0.00018082431],"about_ca_topic_score_codex":0.00002026656,"about_ca_topic_score_gemma":0.000023716331,"teacher_disagreement_score":0.9241519,"about_ca_system_score_codex":0.000040391973,"about_ca_system_score_gemma":0.0000018304813,"threshold_uncertainty_score":0.30524597},"labels":[],"label_agreement":null},{"id":"W2166454355","doi":"10.1109/igcc.2012.6322252","title":"Data centres in the ancillary services market","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Workload; Revenue; Computer science; Energy consumption; Activity-based costing; Data center; Grid; Service (business); Environmental economics; Telecommunications; Business; Computer network; Finance; Marketing; Engineering; Electrical engineering","score_opus":0.01922552246938605,"score_gpt":0.21324412716761332,"score_spread":0.19401860469822726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166454355","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24573484,0.0028308386,0.00081439514,0.0007283339,0.0014177343,0.00019393809,0.000026690639,0.0004131375,0.7478401],"genre_scores_gemma":[0.9983619,0.00015154397,0.00044259036,0.0004636399,0.0002443806,0.0000056491394,0.000039664097,0.000010782469,0.0002798393],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995433,0.000015461428,0.000072697876,0.00006440571,0.00010126093,0.00020285176],"domain_scores_gemma":[0.99939495,0.000031491418,0.000004371181,0.0005453728,0.0000021247251,0.000021667058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002854446,0.00006112794,0.00004343661,0.000027655755,0.000012206555,0.000019611916,0.00045158665,0.000016390755,0.00031287113],"category_scores_gemma":[0.0000028548984,0.000040834937,0.00000685103,0.00009941513,0.0000043262094,0.00026372322,0.00014825784,0.000042392476,0.0000675983],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046395367,0.00007578682,0.15531044,0.00022017235,0.000072522045,0.00001126398,0.0007907761,0.022829864,0.0000570946,0.0049950085,0.80967456,0.005957884],"study_design_scores_gemma":[0.00006170158,9.572116e-7,0.16075262,0.000005326449,0.00000469866,0.0000012693694,0.00037518088,0.066833094,0.000022248005,0.000010335891,0.7718658,0.00006674916],"about_ca_topic_score_codex":0.00008024649,"about_ca_topic_score_gemma":0.0005036601,"teacher_disagreement_score":0.7526271,"about_ca_system_score_codex":0.000019396286,"about_ca_system_score_gemma":9.177463e-7,"threshold_uncertainty_score":0.34257194},"labels":[],"label_agreement":null},{"id":"W2167374930","doi":"10.1109/pes.2007.385728","title":"Demand Response in Electricity Markets: An Overview","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":913,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity; Electricity market; Load management; Electricity demand; Demand forecasting; Computer science; On demand; Demand management; Demand patterns; Derived demand; Environmental economics; Operations research; Demand curve; Electricity generation; Economics; Microeconomics; Engineering; Power (physics); Electrical engineering","score_opus":0.011362572453355153,"score_gpt":0.2375837016387165,"score_spread":0.22622112918536136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167374930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.935596,0.0021041231,0.05947263,0.000030350973,0.0012615247,0.00016045633,0.000001998147,0.0007857151,0.00058720226],"genre_scores_gemma":[0.9820574,0.00034670325,0.016844645,0.00015657514,0.00036789486,0.00002396484,0.000004613144,0.00012562926,0.00007255602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99788,0.000067258676,0.00048913085,0.0003592654,0.0003114387,0.0008929015],"domain_scores_gemma":[0.9991698,0.00021710488,0.00003791274,0.00036962956,0.000032026743,0.00017351295],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003369187,0.00035476888,0.00029596148,0.00017331085,0.00006198737,0.000057467358,0.00027469033,0.00017624345,0.000018214732],"category_scores_gemma":[0.00009279203,0.00041934274,0.00016810972,0.00073640986,0.0000156382,0.00024410193,0.000045026452,0.00038287,0.00000984225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004186609,0.00002401662,0.0006633307,0.00008157016,0.000059410628,0.000026636208,0.00046570005,0.90556407,0.09162003,0.000078558434,0.0010508137,0.00032402272],"study_design_scores_gemma":[0.00064712565,0.00006450073,0.04783267,0.00015712691,0.000020824995,0.000012445138,0.00009538506,0.9028016,0.036847766,0.000015530986,0.01070005,0.0008049978],"about_ca_topic_score_codex":0.000026503827,"about_ca_topic_score_gemma":0.0000150772785,"teacher_disagreement_score":0.054772258,"about_ca_system_score_codex":0.00047951806,"about_ca_system_score_gemma":0.000014387125,"threshold_uncertainty_score":0.99982584},"labels":[],"label_agreement":null},{"id":"W2168376492","doi":"10.1109/ccece.2011.6030718","title":"Real-time monitoring of energy infrastructure","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Cogeneration; Greenhouse gas; Electricity; Energy consumption; Offset (computer science); Computer science; Smart grid; Grid; Natural gas; Automotive engineering; Systems engineering; Simulation; Engineering; Electricity generation; Waste management; Operating system; Electrical engineering","score_opus":0.008255067947501788,"score_gpt":0.17666624467274092,"score_spread":0.16841117672523914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168376492","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43718725,0.000034437377,0.004383625,0.000002126753,0.0007041375,0.000023783516,8.072607e-7,0.0004829127,0.5571809],"genre_scores_gemma":[0.98441887,0.00013585445,0.014308913,0.0000028771149,0.00012812579,0.000005339552,0.000001370235,0.000024969379,0.00097365363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995964,0.0000043367413,0.00012184354,0.00007151821,0.000080188336,0.00012570807],"domain_scores_gemma":[0.9997368,0.0000065283516,0.00001260408,0.00019624447,0.000013601614,0.000034231503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025373065,0.00008347202,0.00009322678,0.00006493464,0.000008551411,0.0000031018158,0.00011276721,0.000037543257,0.00061358925],"category_scores_gemma":[0.0000020751381,0.00007860832,0.000026865308,0.00009467086,0.00001072219,0.00006026946,0.000036541634,0.000028166685,0.000019284682],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003073466,0.00007249964,0.08276062,0.00023840118,0.0007717312,0.000040502186,0.0015050311,0.54486173,0.20773657,0.077393204,0.049425106,0.03516385],"study_design_scores_gemma":[0.0003403724,0.000054212127,0.26499507,0.00003812657,0.000038248872,0.0000032984515,0.00013881875,0.023735853,0.69225967,0.0015174444,0.016428454,0.00045042596],"about_ca_topic_score_codex":0.00012701456,"about_ca_topic_score_gemma":0.0000018247825,"teacher_disagreement_score":0.55620724,"about_ca_system_score_codex":0.000023353778,"about_ca_system_score_gemma":0.00000240786,"threshold_uncertainty_score":0.6718372},"labels":[],"label_agreement":null},{"id":"W2172084342","doi":"10.1109/ccece.2009.5090304","title":"A centralized fuzzy controller for aggregated control of domestic water heaters","year":2009,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Peaking power plant; Peak demand; Controller (irrigation); Electricity; Load management; Fuzzy logic; Computer science; Demand response; Fuzzy control system; Electric power; Control (management); Load profile; Electric power system; Energy storage; Automotive engineering; Power (physics); Engineering; Electrical engineering","score_opus":0.005091861670961626,"score_gpt":0.19992547470361044,"score_spread":0.19483361303264882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172084342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28380767,0.0005297008,0.6833833,0.0027276722,0.0016705631,0.0027597072,0.000034173765,0.0016845668,0.023402674],"genre_scores_gemma":[0.99799097,0.000016239717,0.0009992494,0.00037079718,0.000055803474,0.000048272595,0.000013871573,0.000021665894,0.00048311957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910194,0.000012715154,0.0002799327,0.00012879752,0.00010373014,0.00037290837],"domain_scores_gemma":[0.9996781,0.00004048057,0.00001699371,0.00015919624,0.00003823427,0.00006701314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000105461804,0.00015532372,0.00030630318,0.00008819942,0.000019704285,0.000015680442,0.00010454499,0.000047903606,0.00008613987],"category_scores_gemma":[0.000012216876,0.00010893386,0.00010717496,0.00006148505,0.000016191825,0.00005710527,0.0000057167053,0.000035511548,0.000018466864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004922019,0.00008825684,0.00012266895,0.00010059307,0.0005431988,0.000010770737,0.00015630205,0.8768983,0.10024903,0.0062885094,0.010259608,0.004790548],"study_design_scores_gemma":[0.036302313,0.00051593024,0.003196247,0.000082321516,0.00034798257,0.000008395756,0.000052579417,0.7880119,0.12817706,0.004094607,0.038364083,0.0008465472],"about_ca_topic_score_codex":0.000011358127,"about_ca_topic_score_gemma":0.0000022373572,"teacher_disagreement_score":0.71418333,"about_ca_system_score_codex":0.000039893715,"about_ca_system_score_gemma":0.0000026914427,"threshold_uncertainty_score":0.44421938},"labels":[],"label_agreement":null},{"id":"W2172966071","doi":"10.3390/app5041134","title":"An Efficient Power Scheduling Scheme for Residential Load Management in Smart Homes","year":2015,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Mathematical optimization; Regret; Maximization; Computer science; Electricity; Scheduling (production processes); Scheme (mathematics); Convergence (economics); Engineering; Mathematics; Electrical engineering; Economics","score_opus":0.0198468052039694,"score_gpt":0.25312112771627393,"score_spread":0.23327432251230454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172966071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9019492,0.00018449602,0.03949027,0.0000934569,0.0011398648,0.00054840336,0.0000013921828,0.0003119571,0.056280956],"genre_scores_gemma":[0.9615598,0.000006343499,0.038068715,0.000057050158,0.000076356686,0.00015899181,0.0000028592965,0.00001811806,0.000051789535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984148,0.000009770407,0.0002295617,0.0003746302,0.0005282732,0.00044295428],"domain_scores_gemma":[0.999549,0.00002420393,0.000026365817,0.00025872563,0.00002685056,0.00011485837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011494277,0.0001558944,0.00014082866,0.00024271435,0.0000966426,0.00013669283,0.00046219878,0.000040774812,0.000014600116],"category_scores_gemma":[0.0000120589675,0.0001517369,0.000029609828,0.00054306706,0.000104762476,0.00013208545,0.00009169428,0.00006483066,0.0000472047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001380987,0.000039338363,0.00030655417,0.000022655799,0.000016859973,0.0000038525377,0.00035449024,0.9709588,0.00095919316,0.025634091,0.0009749617,0.00071535195],"study_design_scores_gemma":[0.0023052571,0.00015240746,0.005882022,0.000048842336,0.000027659176,0.0000017041501,0.0057788542,0.9559415,0.0074144625,0.0029527242,0.018669268,0.00082532957],"about_ca_topic_score_codex":0.000021501337,"about_ca_topic_score_gemma":0.00006145846,"teacher_disagreement_score":0.059610575,"about_ca_system_score_codex":0.00016590071,"about_ca_system_score_gemma":0.00003376872,"threshold_uncertainty_score":0.61876506},"labels":[],"label_agreement":null},{"id":"W2181266271","doi":"10.19030/jss.v5i2.7577","title":"Consumer Adoption Challenges To The Smart Grid","year":2012,"lang":"en","type":"article","venue":"Journal of Service Science (JSS)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Work (physics); Business; Grid; Key (lock); Computer security; Marketing; Computer science; Risk analysis (engineering); Engineering; Electrical engineering","score_opus":0.026205321627604278,"score_gpt":0.2349675148613069,"score_spread":0.20876219323370263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181266271","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9430318,0.004816552,0.00205761,0.023032544,0.012625745,0.00019617972,0.0000019570023,0.00010014159,0.014137502],"genre_scores_gemma":[0.99561954,0.00067999243,0.0012527005,0.0012782551,0.0011214449,0.0000041214435,1.7000976e-7,0.000013886999,0.000029878736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986891,0.000019658188,0.00024341613,0.00008645173,0.00058675173,0.0003745903],"domain_scores_gemma":[0.9992174,0.000034010536,0.00007506,0.00025698848,0.00019758295,0.0002189856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001644009,0.000105821266,0.00011947862,0.00021085198,0.00011923213,0.00006259048,0.0006540209,0.000026177426,0.00004937128],"category_scores_gemma":[0.0000363478,0.00007162571,0.000039999133,0.0006680218,0.000047733538,0.0008891084,0.000104157225,0.00015981177,0.00022323891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046208403,0.00022353377,0.0060650925,0.00029524165,0.00020896857,0.000020220055,0.01469921,0.83901834,0.02998683,0.008164762,0.038163293,0.06310827],"study_design_scores_gemma":[0.00038738563,0.00010558118,0.25267568,0.00015396095,0.00007510005,0.00016371823,0.0041100318,0.010244374,0.005154852,0.00008460173,0.7264593,0.00038537677],"about_ca_topic_score_codex":0.000013633403,"about_ca_topic_score_gemma":0.000069374386,"teacher_disagreement_score":0.828774,"about_ca_system_score_codex":0.0001203792,"about_ca_system_score_gemma":0.000029679099,"threshold_uncertainty_score":0.29208118},"labels":[],"label_agreement":null},{"id":"W2182401036","doi":"","title":"The Ontario Smart Metering Initiative: Will Time-of-Use Pricing Work in Ontario?","year":2007,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metering mode; Work (physics); Business; Operations management; Computer science; Engineering","score_opus":0.017430178632127733,"score_gpt":0.19567297893932695,"score_spread":0.17824280030719922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182401036","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93261117,0.00002848836,0.011457898,0.000019744135,0.00050139084,0.00015288124,1.3704441e-7,0.00013996246,0.05508832],"genre_scores_gemma":[0.9882155,0.0000063232533,0.0052845725,0.00006138918,0.000031240434,0.000011257886,0.0000027899282,0.000032446547,0.0063545033],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989067,0.000015355998,0.0003712426,0.00014713203,0.00018061651,0.00037896103],"domain_scores_gemma":[0.99932736,0.00027635717,0.000034717803,0.00029268948,0.000020842399,0.000048028603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005399399,0.00016236422,0.00017436127,0.00014259202,0.000049582875,0.000043774668,0.00018707837,0.000050909002,0.00023220523],"category_scores_gemma":[0.000024707531,0.0001312242,0.000049765848,0.0002847309,0.00002654137,0.00027288304,0.00010164495,0.00025826474,0.000028117556],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010059481,0.000055279732,0.6511566,0.000028765126,0.00030811323,0.0000709914,0.01076391,0.32830817,0.0008298373,0.0011022007,0.0020220128,0.0052535203],"study_design_scores_gemma":[0.0003009167,0.000025243062,0.90949655,0.000074277006,0.000015515012,0.0000014430209,0.00013157868,0.0018338518,0.0024798254,0.000048821017,0.085347086,0.0002448939],"about_ca_topic_score_codex":0.14772026,"about_ca_topic_score_gemma":0.91520077,"teacher_disagreement_score":0.7674805,"about_ca_system_score_codex":0.0008622664,"about_ca_system_score_gemma":0.000027191292,"threshold_uncertainty_score":0.85795516},"labels":[],"label_agreement":null},{"id":"W2210400726","doi":"10.1109/tsg.2015.2440419","title":"A Correlated Equilibrium Game-Theoretic Approach for Multiple Participants Electric Distribution Systems Operation","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Stochastic game; Nash equilibrium; Smart grid; Mathematical optimization; Game theory; Decision maker; Computer science; Operator (biology); Process (computing); Best response; Electric power system; Mathematics; Engineering; Operations research; Power (physics); Mathematical economics","score_opus":0.032551009811655325,"score_gpt":0.22892988243745205,"score_spread":0.19637887262579673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2210400726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08219204,0.00010755913,0.91089493,0.000024088928,0.004642335,0.0009195969,0.00012871997,0.00070804136,0.00038269587],"genre_scores_gemma":[0.99763644,0.00002359849,0.0003672278,0.000018647796,0.00025848986,0.0011033895,0.00027860797,0.000074850446,0.00023875805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998333,0.000075842996,0.0004110092,0.00033604642,0.00028769713,0.0005564062],"domain_scores_gemma":[0.9991659,0.00009081383,0.00004284069,0.0003684046,0.00010854877,0.00022349738],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003686857,0.0002778546,0.00027192797,0.00015711349,0.00009508176,0.00009997711,0.00015855698,0.00014903011,0.00000931264],"category_scores_gemma":[0.00002142355,0.00028490226,0.000109795954,0.00043223894,0.000032546188,0.0002430676,0.0000015731829,0.00021328237,0.000083249644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010532509,0.0001409523,0.00003131485,0.00007665882,0.000110920984,0.0000014504114,0.00010941392,0.99350226,0.0016144657,0.0001395506,0.0038308229,0.000336889],"study_design_scores_gemma":[0.001383464,0.00019274841,0.00008245606,0.000021148919,0.00013414944,0.000008460387,0.00008369688,0.98028344,0.013773319,0.00001288492,0.0037127375,0.00031151556],"about_ca_topic_score_codex":0.000048860966,"about_ca_topic_score_gemma":0.00001062174,"teacher_disagreement_score":0.9154444,"about_ca_system_score_codex":0.00041959685,"about_ca_system_score_gemma":0.000038040598,"threshold_uncertainty_score":0.9999603},"labels":[],"label_agreement":null},{"id":"W2233229545","doi":"","title":"User-Constrained Algorithms for Aggregate Residential Demand Response Programs with Limited Feedback.","year":2015,"lang":"en","type":"dissertation","venue":"UVic’s Research and Learning Repository (University of Victoria)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Natural Sciences and Engineering Research Council of Canada; Simon Fraser University; University of Victoria","keywords":"Aggregate (composite); Demand response; Computer science; Algorithm; Operations research; Engineering","score_opus":0.02041353371005521,"score_gpt":0.2562992659876643,"score_spread":0.23588573227760906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2233229545","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9918566,0.00075911795,0.0009349223,0.000043212334,0.00097637915,0.0009168148,0.000009841639,0.00033009754,0.004173022],"genre_scores_gemma":[0.9109268,0.00040534645,0.004128961,0.0000014349051,0.000825742,0.00002880431,0.00090249267,0.00019667797,0.0825837],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99733007,0.0004030034,0.00022823819,0.000531583,0.00092173537,0.0005853515],"domain_scores_gemma":[0.9978771,0.00033485758,0.0001590475,0.0003530159,0.0009607787,0.0003151641],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001475166,0.00031556125,0.00045571668,0.00059125514,0.00066907884,0.00017504062,0.00039377031,0.00038003587,0.000015800979],"category_scores_gemma":[0.00016116508,0.00037026312,0.00010001735,0.0005152892,0.0002401341,0.00025215978,0.00008176611,0.0009635771,0.0000073663814],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.19798812,0.0021158294,0.020394145,0.025169097,0.018489527,0.0069065853,0.11298202,0.24848463,0.13787013,0.001037127,0.11577926,0.11278355],"study_design_scores_gemma":[0.01893834,0.015137774,0.054350648,0.0056651477,0.001231362,0.00013154214,0.098271556,0.088114575,0.0074596666,0.00042349362,0.70642185,0.003854024],"about_ca_topic_score_codex":0.00031636294,"about_ca_topic_score_gemma":0.0004531631,"teacher_disagreement_score":0.59064263,"about_ca_system_score_codex":0.0002683962,"about_ca_system_score_gemma":0.00026902158,"threshold_uncertainty_score":0.99987495},"labels":[],"label_agreement":null},{"id":"W2240184912","doi":"10.1109/epec.2015.7379994","title":"Appliance scheduling optimization in smart home networks comprising of smart appliances and a photovoltaic panel","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Scheduling (production processes); Smart grid; Computer science; Schedule; Electricity; Grid; Home automation; Demand response; Job shop scheduling; Real-time computing; Distributed computing; Engineering; Embedded system; Electrical engineering; Telecommunications; Operations management","score_opus":0.02752245214106635,"score_gpt":0.2120539909722505,"score_spread":0.18453153883118414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2240184912","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2231049,0.0010286747,0.7708103,0.00001603614,0.00037005366,0.00023671995,6.926716e-7,0.0002077272,0.004224876],"genre_scores_gemma":[0.9542533,0.00020137835,0.045332946,0.0000316198,0.000060706607,0.000037415306,0.0000067895185,0.00002889445,0.000046947058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991269,0.000018306513,0.0002855514,0.0001900331,0.00014283926,0.00023633744],"domain_scores_gemma":[0.9996388,0.000036724818,0.000039742456,0.00017516858,0.00003141009,0.00007814728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028445857,0.00015178001,0.00023119566,0.0001173143,0.000023391576,0.000030506148,0.00010591029,0.00006664611,0.000009692276],"category_scores_gemma":[0.00001018213,0.00016111367,0.000019001463,0.000358529,0.000038817197,0.00016046842,0.00006300332,0.00012776883,0.0000041855183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010446891,0.0000121315925,0.0129326545,0.000058756017,0.000015870006,0.000002051791,0.00007896774,0.98565555,0.00017039596,0.00012493407,0.00013537458,0.0008028906],"study_design_scores_gemma":[0.0005184932,0.000016507864,0.0021965506,0.00006943454,0.000007903882,0.0000016368459,0.00024223843,0.9956301,0.0005513012,0.000050727216,0.00053701905,0.00017809933],"about_ca_topic_score_codex":0.00012817651,"about_ca_topic_score_gemma":0.00010425765,"teacher_disagreement_score":0.7311484,"about_ca_system_score_codex":0.0000623907,"about_ca_system_score_gemma":0.000008046707,"threshold_uncertainty_score":0.6570025},"labels":[],"label_agreement":null},{"id":"W2241256076","doi":"10.1109/epec.2015.7379942","title":"Model predictive control based home energy management system in smart grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Model predictive control; Smart grid; Computer science; Energy management; Control (management); Energy management system; Grid; Energy (signal processing); Engineering; Artificial intelligence; Electrical engineering","score_opus":0.010206831935784423,"score_gpt":0.17090971545936867,"score_spread":0.16070288352358425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2241256076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002651895,0.00008723587,0.83584684,0.000052886022,0.0010599692,0.00022744245,0.000011718609,0.0009468652,0.15911514],"genre_scores_gemma":[0.9958657,0.000008312892,0.002644027,0.00018566211,0.00011622297,0.00030028343,0.000018434095,0.00005016874,0.000811176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987392,0.00003242936,0.00028890205,0.00025230282,0.00032316154,0.0003640174],"domain_scores_gemma":[0.9993968,0.000019560513,0.000020674968,0.0003764177,0.00003368868,0.00015285314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025423634,0.00021889393,0.00024107897,0.00029143764,0.000016719192,0.000029356035,0.00021542715,0.00006287128,0.000012345532],"category_scores_gemma":[0.000002953326,0.00021529225,0.00005011033,0.00023501029,0.000014649771,0.00013112366,0.000055610424,0.00007314021,0.000042925138],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030023459,0.000026087017,0.00053846755,0.00007786781,0.00008694279,0.000042625717,0.000023175264,0.9708991,0.0000063336333,0.014325632,0.013700417,0.00024334676],"study_design_scores_gemma":[0.002199086,0.00002973781,0.00092481315,0.000043874123,0.000031719057,9.198643e-7,0.00017088927,0.98961323,0.00007657332,0.000091070244,0.0065854825,0.00023257227],"about_ca_topic_score_codex":0.00010004555,"about_ca_topic_score_gemma":0.00011344286,"teacher_disagreement_score":0.99321383,"about_ca_system_score_codex":0.0005792877,"about_ca_system_score_gemma":0.000014709694,"threshold_uncertainty_score":0.8779363},"labels":[],"label_agreement":null},{"id":"W2244906720","doi":"10.1109/epec.2015.7379949","title":"An evolutionary game approach to predict demand response from real-time pricing","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Dynamic pricing; Schedule; Demand response; Incentive; Consumption (sociology); Outcome (game theory); Computer science; Microeconomics; Population; Pricing strategies; Response time; Economics; Engineering","score_opus":0.013327687157475657,"score_gpt":0.20723286604952393,"score_spread":0.19390517889204828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2244906720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75577986,0.000058798596,0.1482887,0.000070489186,0.0003073595,0.00023872287,0.000010156034,0.0013605889,0.093885355],"genre_scores_gemma":[0.9427849,0.0000068042677,0.05475262,0.000077979756,0.00033400545,0.00005433481,0.000059956874,0.000055220175,0.0018741778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989322,0.000084129926,0.00018682635,0.00026501427,0.0002676558,0.00026416263],"domain_scores_gemma":[0.99911994,0.00005539491,0.000012280252,0.00048500532,0.00003315816,0.00029422776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004127609,0.00015652481,0.00015022181,0.0001434902,0.00002494696,0.00003341671,0.00021835385,0.00006197645,0.00006128187],"category_scores_gemma":[0.00004656603,0.00015350553,0.000026254307,0.00021699519,0.000012961864,0.00020597846,0.00007756709,0.000066893335,0.00030048724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013084475,0.000040404735,0.00072368776,0.000005319824,0.000042262218,0.00000543926,0.0004357226,0.93515223,0.004751773,0.00014171093,0.05845719,0.00011341504],"study_design_scores_gemma":[0.0003976495,0.000093629955,0.061621092,0.000012286855,0.000020465415,0.000002946323,0.00018648621,0.92328274,0.00057393615,0.00012314632,0.013428232,0.0002574138],"about_ca_topic_score_codex":0.00021243906,"about_ca_topic_score_gemma":0.0000039523047,"teacher_disagreement_score":0.18700506,"about_ca_system_score_codex":0.00022951252,"about_ca_system_score_gemma":0.00002224679,"threshold_uncertainty_score":0.6259774},"labels":[],"label_agreement":null},{"id":"W2245031077","doi":"10.1109/epec.2015.7379973","title":"A basic load following control strategy in a direct load control program","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Intermittency; Control (management); Wind power; Controller (irrigation); Load balancing (electrical power); Computer science; Load profile; Grid; Reliability (semiconductor); Load following power plant; Control system; Load management; Automotive engineering; Reliability engineering; Renewable energy; Engineering; Base load power plant; Distributed generation; Electricity; Electrical engineering","score_opus":0.013045605457623743,"score_gpt":0.2259313974802323,"score_spread":0.21288579202260857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2245031077","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26884663,0.0017254717,0.0152029,0.0002767347,0.0017125896,0.001968828,0.000006292346,0.0034305402,0.70683],"genre_scores_gemma":[0.99819803,0.000005602609,0.00029829604,0.00013996467,0.0001283091,0.00038465913,0.0000024512856,0.00004652484,0.00079613866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847364,0.000047373615,0.00030203548,0.00025009236,0.00041873893,0.00050813984],"domain_scores_gemma":[0.9994043,0.000055628403,0.000019821042,0.00029890132,0.000051339353,0.00017001461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055588625,0.00023835669,0.0003501519,0.000100812475,0.000017265624,0.000083885956,0.00018297571,0.00007881073,0.000043439613],"category_scores_gemma":[0.00007143704,0.0002233255,0.000109269604,0.00028999714,0.000015219474,0.0001940096,0.000022631468,0.00014109598,0.00013869468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053383552,0.00013269878,0.0052898997,0.000031275064,0.00029638314,0.00022512463,0.00012943019,0.9668137,0.00020063347,0.00049121986,0.009895199,0.016441083],"study_design_scores_gemma":[0.013219464,0.00027118498,0.0055970894,0.000057971767,0.00009892899,0.000004977187,0.00024737706,0.9086365,0.00022292968,0.00015942447,0.070813246,0.00067089294],"about_ca_topic_score_codex":0.00047715657,"about_ca_topic_score_gemma":0.001233786,"teacher_disagreement_score":0.7293514,"about_ca_system_score_codex":0.00056542666,"about_ca_system_score_gemma":0.00009062223,"threshold_uncertainty_score":0.91069496},"labels":[],"label_agreement":null},{"id":"W2246825951","doi":"10.1109/rtss.2015.10","title":"Distributed Deadline and Renewable Aware Electric Vehicle Demand Response in the Smart Grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Smart grid; Electric vehicle; Computer science; Renewable energy; Flexibility (engineering); Grid; Inefficiency; Hierarchy; Peak demand; Environmental economics; Electricity; Power (physics); Engineering; Economics; Electrical engineering; Microeconomics; Market economy","score_opus":0.013595247133597471,"score_gpt":0.20705029946908823,"score_spread":0.19345505233549076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2246825951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98297346,0.00041660917,0.012870738,0.000869704,0.00019181211,0.00015359402,0.0000053439257,0.00021479714,0.002303929],"genre_scores_gemma":[0.99930483,0.000042391683,0.00012117739,0.00014479879,0.00007422188,0.000029192306,0.000020562027,0.000016168397,0.00024666524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923193,0.00008920049,0.00015178321,0.00013167928,0.00015006195,0.00024531496],"domain_scores_gemma":[0.99954623,0.00011670552,0.000010486314,0.00023786463,0.000020562018,0.000068166446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007533193,0.000112197486,0.00010703721,0.00009458968,0.000031004594,0.000043464282,0.00014129568,0.00004158288,0.00001061136],"category_scores_gemma":[0.00008272923,0.000083121886,0.000014901309,0.00046662518,0.000011900013,0.000088184686,0.00004249968,0.00008877546,0.000015769512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025671162,0.00004399479,0.0125446115,0.0000244948,0.000033325752,0.00006458814,0.00024322025,0.8523282,0.0013652855,0.00018208385,0.13260956,0.00030393968],"study_design_scores_gemma":[0.001631982,0.00017963102,0.12509441,0.00001730851,0.000026059106,0.000022335247,0.00042693492,0.74256706,0.003780593,0.00032802395,0.12557867,0.00034700072],"about_ca_topic_score_codex":0.00022343826,"about_ca_topic_score_gemma":0.0003497226,"teacher_disagreement_score":0.11254981,"about_ca_system_score_codex":0.00008280301,"about_ca_system_score_gemma":0.000014228859,"threshold_uncertainty_score":0.33896118},"labels":[],"label_agreement":null},{"id":"W2247142144","doi":"10.1109/epec.2015.7379950","title":"A distributed game theoretic approach to energy trading in the smart grid","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Grid; Profit (economics); Energy (signal processing); Game theory; Distributed generation; Distributed computing; Mathematical optimization; Renewable energy; Microeconomics; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.01865532845281135,"score_gpt":0.19517867067138964,"score_spread":0.1765233422185783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247142144","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05101137,0.0000984535,0.5225496,0.0005652294,0.0007686729,0.00022459209,0.0000072881617,0.00048477843,0.42429],"genre_scores_gemma":[0.9983644,0.0000054081456,0.00079630525,0.0003552849,0.00016097783,0.000120657925,0.00003676168,0.000024019288,0.00013617793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991382,0.000047681337,0.00016280524,0.00015752732,0.00020552459,0.00028829236],"domain_scores_gemma":[0.9995258,0.000038216953,0.00000772468,0.00032125143,0.000011282515,0.00009574757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003544864,0.0001394808,0.00012397318,0.00010044336,0.000014375232,0.000050904848,0.00032386518,0.000035828853,0.000017260978],"category_scores_gemma":[0.00002718065,0.000098229,0.00003260978,0.0004691155,0.000017930253,0.00006198818,0.000045989524,0.000082452025,0.000023013718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007916637,0.00005924347,0.0002856253,0.000016391436,0.000028917346,0.0000101844735,0.0011823892,0.693997,0.000032169482,0.22052985,0.08318955,0.0006607168],"study_design_scores_gemma":[0.000584104,0.000046353463,0.002605846,0.00001407853,0.000018734072,0.000014486278,0.0015752644,0.77145606,0.0004341847,0.002852077,0.22001807,0.0003807333],"about_ca_topic_score_codex":0.000103055936,"about_ca_topic_score_gemma":0.00005078579,"teacher_disagreement_score":0.94735307,"about_ca_system_score_codex":0.00011157674,"about_ca_system_score_gemma":0.0000063136204,"threshold_uncertainty_score":0.40056622},"labels":[],"label_agreement":null},{"id":"W2247506721","doi":"10.1109/tie.2015.2492946","title":"Distributed MPC of Aggregated Heterogeneous Thermostatically Controlled Loads in Smart Grid","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Smart grid; Model predictive control; Grid; Computer science; Population; Scheme (mathematics); Aggregate (composite); Function (biology); Distributed computing; Control theory (sociology); Control engineering; Control (management); Engineering; Mathematics; Artificial intelligence","score_opus":0.02667356529660642,"score_gpt":0.22165942163768299,"score_spread":0.19498585634107657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247506721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62899053,0.00046320682,0.36257458,0.0003043305,0.004134974,0.0014381113,0.00019898058,0.0006127842,0.0012824865],"genre_scores_gemma":[0.99943215,0.000115130875,0.00006323735,0.000027621429,0.000099495046,0.00011773575,0.000030345176,0.0000529941,0.00006126757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981599,0.00011511287,0.0006243657,0.000226809,0.00034310843,0.00053074595],"domain_scores_gemma":[0.9992262,0.00013727263,0.00007434771,0.0003295498,0.00007888347,0.00015376143],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033477877,0.00027530955,0.0005127978,0.0002480809,0.00003486124,0.000025086878,0.00021968964,0.0002553008,0.000055523764],"category_scores_gemma":[0.00003272418,0.00027674035,0.00014031181,0.00065117003,0.000050893308,0.00008614813,0.0000016593274,0.0006110607,0.000020051028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009063335,0.00017813245,0.000011780664,0.0000071408786,0.0002725994,0.000014700189,0.000050331786,0.9922453,0.00084487605,0.00007149746,0.00072563026,0.0046716314],"study_design_scores_gemma":[0.052664716,0.0023967412,0.000036561956,0.00017992266,0.0004650696,0.00003418735,0.00013546243,0.68025404,0.24302422,0.0004457364,0.01910243,0.0012609258],"about_ca_topic_score_codex":0.00007825761,"about_ca_topic_score_gemma":0.00031634726,"teacher_disagreement_score":0.37044162,"about_ca_system_score_codex":0.0005986632,"about_ca_system_score_gemma":0.00018449078,"threshold_uncertainty_score":0.99996847},"labels":[],"label_agreement":null},{"id":"W2248624141","doi":"10.1109/epec.2015.7379983","title":"Application of wavelet-based ensemble tree classifier for non-intrusive load monitoring","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Wavelet; Daubechies wavelet; Classifier (UML); Pattern recognition (psychology); Artificial intelligence; Decision tree; Computer science; Ensemble learning; Decision tree learning; Discrete wavelet transform; Machine learning; Wavelet transform; Data mining","score_opus":0.02187375872455487,"score_gpt":0.2354163424159998,"score_spread":0.2135425836914449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248624141","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03753747,0.000025265492,0.9276466,0.000068067784,0.0005907077,0.00032451656,0.0000021360934,0.00019233862,0.0336129],"genre_scores_gemma":[0.97220397,0.000002383359,0.026840845,0.000016673765,0.00024744435,0.00021030744,0.000007695439,0.00002976453,0.00044093825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993627,0.000003930708,0.00017132047,0.00012865628,0.0001674016,0.00016595497],"domain_scores_gemma":[0.9994897,0.000039952527,0.000027965996,0.00026273562,0.0001146951,0.00006495484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012620752,0.00010445779,0.0001281867,0.00006151457,0.000014225113,0.000009569174,0.00011012597,0.000050442697,0.000004608604],"category_scores_gemma":[0.000020471527,0.000103908984,0.000043975848,0.00011416475,0.000011125731,0.000057860605,0.000018685094,0.000036440255,0.000024153485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084045845,0.00009188776,0.0023492584,0.00032952623,0.00016807012,0.0000018575571,0.00029895993,0.74845326,0.07048931,0.0039372058,0.034436442,0.13936017],"study_design_scores_gemma":[0.00080955256,0.00004217957,0.0015249526,0.000012034265,0.000019936957,1.6478633e-7,0.00011803925,0.70361835,0.2713469,0.00016621381,0.022194982,0.00014671276],"about_ca_topic_score_codex":0.000046871097,"about_ca_topic_score_gemma":0.000026090582,"teacher_disagreement_score":0.93466645,"about_ca_system_score_codex":0.00018491036,"about_ca_system_score_gemma":0.000024680807,"threshold_uncertainty_score":0.42372853},"labels":[],"label_agreement":null},{"id":"W2249348700","doi":"10.1109/epec.2015.7379946","title":"Performance assessment tool for remote electrical microgrids (PATREM)","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Natural Resources Canada","funders":"","keywords":"Microgrid; Electricity; Smart grid; Grid; Computer science; Renewable energy; Electricity generation; Systems engineering; Environmental economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.01614866621310581,"score_gpt":0.2382831101123979,"score_spread":0.22213444389929207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2249348700","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47611347,0.00015041739,0.4147346,0.00024719047,0.0016364802,0.000519486,0.0000028362729,0.001161919,0.1054336],"genre_scores_gemma":[0.89604324,0.00006556767,0.10060344,0.00016770448,0.00043165073,0.000043394204,0.000019552408,0.000052790336,0.0025726333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920213,0.000007021903,0.00017197656,0.00014780433,0.00016210834,0.00030894383],"domain_scores_gemma":[0.99961317,0.000022959217,0.000011458121,0.00022635763,0.00004377011,0.00008230841],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002123199,0.00013091411,0.00012308602,0.000069853246,0.000028046086,0.000032345615,0.00014085154,0.000046529756,0.000026610396],"category_scores_gemma":[0.0000111150475,0.000121722434,0.00004673119,0.00014697836,0.0000084454205,0.00010251533,0.000033970988,0.000077016484,0.000056061184],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033819124,0.00006601651,0.005656493,0.00012349014,0.00017101028,0.0000060234256,0.000060319686,0.41737992,0.0020843123,0.002330029,0.34874022,0.22334838],"study_design_scores_gemma":[0.00045655115,0.00009726278,0.0031674383,0.000004783201,0.000014424887,0.0000028908173,0.000007548966,0.78705114,0.0026077658,0.000046940528,0.20636715,0.00017609146],"about_ca_topic_score_codex":0.000008138424,"about_ca_topic_score_gemma":0.0000040218774,"teacher_disagreement_score":0.4199298,"about_ca_system_score_codex":0.00022500205,"about_ca_system_score_gemma":0.00002391182,"threshold_uncertainty_score":0.4963697},"labels":[],"label_agreement":null},{"id":"W2254492236","doi":"","title":"Coordinated Operation of Distributed Energy Resources in Renewables Based Microgrids under Uncertainties","year":2014,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo","keywords":"Renewable energy; Distributed generation; Microgrid; Computer science; Energy (signal processing); Environmental economics; Distributed computing; Engineering; Environmental science; Electrical engineering; Economics; Physics","score_opus":0.004949447171886276,"score_gpt":0.16406176936370018,"score_spread":0.1591123221918139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2254492236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99587876,0.00018720557,0.002687941,0.00013490587,0.00032023416,0.00011112526,0.000058622827,0.00012073241,0.0005005029],"genre_scores_gemma":[0.9612924,0.000119148805,0.00049510074,0.000007583155,0.000026735732,0.0000013606098,0.0035033606,0.000044205586,0.03451012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990496,0.00006719601,0.0002061032,0.00024739426,0.00020154275,0.00022814858],"domain_scores_gemma":[0.9993869,0.00003650725,0.00013277102,0.0002861968,0.00011234471,0.00004527109],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011908869,0.0002533257,0.00044875112,0.0005301962,0.00005610667,0.000017150549,0.0003155129,0.0002664865,0.000087509776],"category_scores_gemma":[0.0000066604066,0.00031404573,0.00010377851,0.00032944322,0.00006536853,0.00011166306,0.00003509935,0.000098618664,0.0000022808092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012698169,0.000045533237,0.00037790442,0.0005394488,0.00014896876,0.000007636792,0.0047085765,0.97938126,0.010079809,0.00027267437,0.0038638196,0.00044738338],"study_design_scores_gemma":[0.0056223054,0.00043402836,0.031322636,0.0023159778,0.00069104723,0.00000112038,0.21246752,0.5365458,0.17966248,0.000324991,0.028303454,0.0023085973],"about_ca_topic_score_codex":0.06513341,"about_ca_topic_score_gemma":0.19869691,"teacher_disagreement_score":0.44283542,"about_ca_system_score_codex":0.00016569665,"about_ca_system_score_gemma":0.000029708795,"threshold_uncertainty_score":0.99993116},"labels":[],"label_agreement":null},{"id":"W2266287845","doi":"10.1007/s11431-012-4844-3","title":"Active power regulation of wind power systems through demand response","year":2012,"lang":"en","type":"article","venue":"Science China Technological Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Wind power; Power (physics); Electric power system; Environmental science; Electrical engineering; Engineering; Physics; Electricity","score_opus":0.014928516748151354,"score_gpt":0.24375957273100923,"score_spread":0.22883105598285788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266287845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96852183,0.00029681428,0.0053140363,0.00022820978,0.0007202788,0.0001790779,0.0000019449235,0.00040334938,0.02433443],"genre_scores_gemma":[0.99852896,0.0000122197835,0.0013790451,0.000011097492,0.000012915515,0.000009796989,1.8712352e-7,0.000005250914,0.000040534662],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9980496,0.000048275477,0.000235607,0.0003193384,0.0007742409,0.00057289435],"domain_scores_gemma":[0.99939555,0.000084422725,0.00007864764,0.00032102934,0.000040020695,0.00008033202],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0027826263,0.00015017888,0.00017530259,0.0002730036,0.0003158195,0.00007178338,0.0008935301,0.00010684809,0.00006901036],"category_scores_gemma":[0.00047407352,0.00010267191,0.000037081372,0.002626003,0.003180851,0.0012871095,0.00022404056,0.00013209824,0.000022000835],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006288994,0.00017178322,0.011221938,0.000025190611,0.000021681337,0.0000031557352,0.0014662066,0.2603661,0.3533108,0.37136644,0.00056580326,0.0014179937],"study_design_scores_gemma":[0.000180816,0.0003561208,0.8317405,0.00006861236,0.000009523238,0.000018528286,0.0023567614,0.012567882,0.14132302,0.006370467,0.004558933,0.0004488571],"about_ca_topic_score_codex":0.000009629186,"about_ca_topic_score_gemma":4.0894776e-7,"teacher_disagreement_score":0.82051855,"about_ca_system_score_codex":0.00013828158,"about_ca_system_score_gemma":0.000028769327,"threshold_uncertainty_score":0.9995319},"labels":[],"label_agreement":null},{"id":"W2268711958","doi":"10.1109/ipsc.2015.7827754","title":"Stochastic optimization of demand response aggregators in wholesale electricity markets","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"News aggregator; Demand response; CVAR; Electricity market; Electricity; Stochastic optimization; Stochastic programming; Load management; Computer science; Mathematical optimization; Business; Operations research; Microeconomics; Expected shortfall; Economics; Risk management; Engineering; Finance; Mathematics","score_opus":0.009564120439668047,"score_gpt":0.19912650737592538,"score_spread":0.18956238693625732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2268711958","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5186708,0.000118961216,0.4778884,0.000028040606,0.00014733263,0.000096046795,5.7629455e-7,0.00011493156,0.0029349145],"genre_scores_gemma":[0.9970007,0.0000099537165,0.002701591,0.000012044474,0.000016554703,0.000010768205,0.000002526405,0.000017738714,0.00022814072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993966,0.000054452375,0.00017497683,0.00009225847,0.00013692968,0.00014473293],"domain_scores_gemma":[0.99968535,0.00006168223,0.000020303749,0.00014690847,0.000028674462,0.00005707152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004749725,0.00008256269,0.000111773305,0.00022542237,0.0000061743485,0.000007365351,0.0000807451,0.00003935309,0.000026847125],"category_scores_gemma":[0.00015239793,0.000084994615,0.000015962176,0.00037476086,0.000011645978,0.00008512366,0.000024971934,0.000048969177,0.0000071346844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012062491,0.0000146868915,0.00047464,0.000010905362,0.000009965618,0.0000029488685,0.000057728015,0.99748766,0.00011992647,0.000068450405,0.0014810264,0.00015142359],"study_design_scores_gemma":[0.0005033956,0.000028566528,0.0061711576,0.000019852863,0.000005871057,0.000001190039,0.000035835215,0.9914068,0.0014957237,0.000035580066,0.00019726953,0.00009876139],"about_ca_topic_score_codex":0.00001666012,"about_ca_topic_score_gemma":0.00001747156,"teacher_disagreement_score":0.4783299,"about_ca_system_score_codex":0.00011521062,"about_ca_system_score_gemma":0.000017346143,"threshold_uncertainty_score":0.346598},"labels":[],"label_agreement":null},{"id":"W2270393492","doi":"10.2139/ssrn.2360552","title":"Limit Order Books with Stochastic Market Depth","year":2013,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Limit (mathematics); Order (exchange); Order book; Mathematical economics; Economics; Statistical physics; Mathematics; Financial economics; Physics; Mathematical analysis; Finance","score_opus":0.0036026572142088386,"score_gpt":0.16572024919327236,"score_spread":0.16211759197906353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2270393492","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20698647,0.0030580154,0.7031975,0.0006612946,0.00087852083,0.00048294067,7.9889264e-7,0.0006154175,0.08411905],"genre_scores_gemma":[0.99206066,0.0004356075,0.0005177121,0.00007949468,0.00033655012,0.000038101112,0.0000014822668,0.00007911258,0.0064512603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974264,0.000023707604,0.00019091889,0.00014234366,0.00025017533,0.0019664867],"domain_scores_gemma":[0.99955213,0.000026465874,0.000039379098,0.00020666409,0.00006719466,0.00010818634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032513894,0.00020790935,0.00015471096,0.00013129294,0.00009211867,0.00009132102,0.00024229426,0.000048475944,0.00034346207],"category_scores_gemma":[0.000014200505,0.00016913594,0.00004482239,0.00017383751,0.000024985407,0.00022775707,0.000028858065,0.0010809215,0.00017622148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058181184,0.00006725819,0.00093241833,0.00003564735,0.0015328251,0.000020219763,0.0001306343,0.89092165,0.00025123404,0.033560492,0.024437157,0.0480523],"study_design_scores_gemma":[0.009506581,0.0029663562,0.03032845,0.000392017,0.0007810792,0.004963474,0.0047877,0.717268,0.00046242928,0.15307029,0.070963286,0.004510367],"about_ca_topic_score_codex":0.000041069063,"about_ca_topic_score_gemma":0.00075904495,"teacher_disagreement_score":0.78507423,"about_ca_system_score_codex":0.0006454992,"about_ca_system_score_gemma":0.00024015538,"threshold_uncertainty_score":0.6897163},"labels":[],"label_agreement":null},{"id":"W2270752796","doi":"10.1109/epec.2014.57","title":"UPS without Batteries","year":2014,"lang":"en","type":"article","venue":"Electrical Power and Energy Conference","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Backup; Reliability engineering; Tripping; Battery (electricity); Computer science; Electrical engineering; Power (physics); Automotive engineering; Electric power system; Engineering; Circuit breaker","score_opus":0.005475231900322881,"score_gpt":0.17873007762782198,"score_spread":0.1732548457274991,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2270752796","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07718546,0.0005569752,0.48107874,0.00040912288,0.00087891263,0.000036802947,0.0000011964801,0.0008476379,0.43900517],"genre_scores_gemma":[0.9978077,0.00014195875,0.0002747692,0.00032937134,0.00009019853,0.000014282665,0.0000034605027,0.000020642527,0.0013176088],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927205,0.00002264383,0.00012483484,0.00018107152,0.00011693699,0.00028244557],"domain_scores_gemma":[0.99965775,0.000036153655,0.000010867083,0.00017067505,0.000021488417,0.00010305536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057951725,0.00015038511,0.00015842309,0.00006905151,0.000047284484,0.000059125876,0.00011678864,0.000055516804,0.00010086128],"category_scores_gemma":[0.00001891937,0.00013848046,0.000023938443,0.00012713412,0.00004097673,0.00007965578,0.00003804942,0.000091823604,0.000019307283],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027479518,0.000042805743,0.0038050779,0.000025750329,0.00012541398,0.000008931397,0.00018042793,0.008174703,0.0038178212,0.82732,0.02478175,0.13168986],"study_design_scores_gemma":[0.00040476507,0.00016632119,0.012393496,0.0000157459,0.000020622929,0.000010765303,0.000009773293,0.15489638,0.004724925,0.0039402754,0.8228811,0.00053584925],"about_ca_topic_score_codex":0.00002397117,"about_ca_topic_score_gemma":0.000018981857,"teacher_disagreement_score":0.9206222,"about_ca_system_score_codex":0.000018682975,"about_ca_system_score_gemma":0.000006259933,"threshold_uncertainty_score":0.564707},"labels":[],"label_agreement":null},{"id":"W2273653185","doi":"","title":"Making a case for dynamic electricity pricing","year":2006,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Idle; Dynamic pricing; Quarter (Canadian coin); Electricity pricing; Incentive; Air conditioning; Electricity demand; Electricity retailing; Economics; Electricity market; Electricity generation; Business; Environmental economics; Operations management; Microeconomics; Engineering; Electrical engineering; Power (physics); Mechanical engineering; Computer science; Geography; Physics","score_opus":0.028654782074364497,"score_gpt":0.30361718488250405,"score_spread":0.27496240280813955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2273653185","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88828486,0.00041926638,0.006414936,0.000097712546,0.001596789,0.0023763485,0.0000919481,0.00053327205,0.10018485],"genre_scores_gemma":[0.9914401,0.0011286478,0.005405598,0.00002144248,0.00031572778,0.000863703,0.000068731824,0.0001796879,0.00057636487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99727684,0.00007798578,0.00062793324,0.00074978074,0.00017703557,0.0010904211],"domain_scores_gemma":[0.99847543,0.00041821343,0.0000847143,0.00087211514,0.00006327679,0.00008624574],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012664462,0.00037509637,0.0004948008,0.0008794428,0.000138827,0.00016836316,0.00051155855,0.00036867135,0.000012167747],"category_scores_gemma":[0.00014572291,0.0004750846,0.00018647572,0.00019515309,0.000064818625,0.00007272226,0.00066408224,0.001299547,0.0000040257346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015995733,0.00003086273,0.00035886062,0.0005239458,0.00010139263,0.00030846975,0.000046663146,0.8964932,0.000040628154,0.00020151967,0.0001694151,0.10170905],"study_design_scores_gemma":[0.00037365966,0.000030460262,0.0010390859,0.00015854731,0.000015483578,0.000072702125,0.00006627267,0.9849693,0.000073247174,0.0009454798,0.011768909,0.00048684273],"about_ca_topic_score_codex":0.00015405244,"about_ca_topic_score_gemma":0.0020242273,"teacher_disagreement_score":0.10315522,"about_ca_system_score_codex":0.0032758596,"about_ca_system_score_gemma":0.00012274826,"threshold_uncertainty_score":0.9997701},"labels":[],"label_agreement":null},{"id":"W2274590954","doi":"10.1016/j.suscom.2016.01.004","title":"A simple and robust approach to energy disaggregation in the presence of outliers","year":2016,"lang":"en","type":"article","venue":"Sustainable Computing Informatics and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada; Natural Science Foundation of Ningbo","keywords":"Computer science; Outlier; Overhead (engineering); Cluster analysis; Data mining; TRACE (psycholinguistics); Energy consumption; Energy (signal processing); Event (particle physics); Data cleansing; Anomaly detection; Hidden Markov model; Markov chain; Artificial intelligence; Machine learning; Engineering; Data quality; Mathematics","score_opus":0.008811287612282077,"score_gpt":0.18599460527200934,"score_spread":0.17718331765972725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2274590954","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39372906,0.00019502445,0.5946753,0.000026610227,0.000107976564,0.00034026426,0.0000014434615,0.0000498998,0.010874409],"genre_scores_gemma":[0.9993164,0.00002180397,0.00049645046,0.000015501733,0.000028001916,0.000016983293,0.0000016880666,0.0000071051304,0.00009607195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992411,0.000027469481,0.00031899626,0.00005751886,0.00013469001,0.00022021597],"domain_scores_gemma":[0.9996015,0.00010664969,0.000054840955,0.00016011983,0.000041783387,0.000035147346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005691001,0.000086969296,0.00013378875,0.00011685579,0.000052009396,0.00007697835,0.00011964194,0.000027844184,1.6936647e-7],"category_scores_gemma":[0.000044587527,0.00005371909,0.000010131863,0.00019782671,0.000024577465,0.00014564833,0.00009655988,0.000030325848,2.0770227e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017129033,0.000005500112,0.001387339,0.0007740083,0.00001083212,7.353314e-7,0.0045934473,0.9560995,0.000002714558,0.034341622,0.0005976417,0.002184915],"study_design_scores_gemma":[0.00019159724,0.00001977227,0.0013488638,0.00008737734,0.0000035712728,0.000003958001,0.021021565,0.9727366,0.000006723652,0.000087616456,0.0044052806,0.00008707678],"about_ca_topic_score_codex":0.00018489177,"about_ca_topic_score_gemma":0.0000037927457,"teacher_disagreement_score":0.6055873,"about_ca_system_score_codex":0.000046862548,"about_ca_system_score_gemma":0.000006893912,"threshold_uncertainty_score":0.2190601},"labels":[],"label_agreement":null},{"id":"W2278960053","doi":"","title":"Optimización del uso de la potencia reactiva en el sistema eléctrico ecuatoriano mediante la programación no lineal","year":2014,"lang":"es","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; AC power; Compiler; Electric power system; Scheduling (production processes); Electric power transmission; Voltage; Engineering; Power (physics); Electrical engineering; Mathematical optimization; Mathematics; Operating system; Physics","score_opus":0.003215737007178399,"score_gpt":0.24905857699344347,"score_spread":0.24584283998626508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2278960053","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11992008,0.0009367911,0.07303631,0.00036270663,0.013093678,0.0031448524,0.00010298561,0.0037487422,0.7856538],"genre_scores_gemma":[0.8792632,0.0035141797,0.076006554,0.00021590754,0.009174599,0.0014180948,0.0038683047,0.0012218973,0.025317261],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9947818,0.0006889936,0.0011931225,0.0010946325,0.0010061985,0.0012352895],"domain_scores_gemma":[0.9963368,0.0012834633,0.00040569092,0.001086299,0.00036132484,0.0005263907],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0017133908,0.0013219609,0.0011843176,0.0007567713,0.00018652549,0.0004768651,0.0010089485,0.0017561513,0.00021586943],"category_scores_gemma":[0.0009637827,0.0013535924,0.00052814494,0.00073240825,0.00008980526,0.0003306398,0.00016386335,0.0013030272,0.0006050467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008555544,0.0016846638,0.006859807,0.011298356,0.0066678547,0.0013461275,0.0035420968,0.7616492,0.013084585,0.094175376,0.03690102,0.061935358],"study_design_scores_gemma":[0.003245543,0.00042233928,0.016901262,0.0018587817,0.0017463381,0.000107063606,0.0009391864,0.5652325,0.0075160665,0.00031002893,0.39760485,0.004115999],"about_ca_topic_score_codex":0.0013372212,"about_ca_topic_score_gemma":0.00011348402,"teacher_disagreement_score":0.7603366,"about_ca_system_score_codex":0.00078309886,"about_ca_system_score_gemma":0.000306564,"threshold_uncertainty_score":0.99995315},"labels":[],"label_agreement":null},{"id":"W2279524407","doi":"10.1049/iet-gtd.2015.0103","title":"Optimal scheduling of virtual power plant with battery degradation cost","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Fundamental Research Funds for the Central Universities","keywords":"Scheduling (production processes); Battery (electricity); Computer science; Degradation (telecommunications); Reliability engineering; Power (physics); Engineering; Telecommunications; Operations management","score_opus":0.021536492693763523,"score_gpt":0.21002927132770116,"score_spread":0.18849277863393765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279524407","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3538642,0.00006598095,0.64520836,0.00010509421,0.000267327,0.000141388,0.0000778526,0.00011682908,0.00015295351],"genre_scores_gemma":[0.99134135,0.000034747532,0.0045129713,0.000020290687,0.00012144521,0.000036267982,0.0038621959,0.000024302428,0.000046437413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998886,0.000040491555,0.0003172574,0.00019443875,0.00037293098,0.00018889342],"domain_scores_gemma":[0.9994957,0.000012635929,0.000055037504,0.00017195076,0.00012332533,0.00014134367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022087096,0.00017437067,0.00015450308,0.00006778544,0.00006304956,0.00004026996,0.000085065236,0.00008904112,0.000053429954],"category_scores_gemma":[0.000010719428,0.00015628924,0.000039997052,0.00021094877,0.000027539047,0.00028427463,0.000008349745,0.00009869857,0.000012135811],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006162911,0.000041768002,0.00013627094,0.000015427357,0.00003180504,0.0000027497072,0.00011047832,0.96529007,0.02457149,0.00081365556,0.0061841407,0.002740511],"study_design_scores_gemma":[0.0011561784,0.00020450751,0.00089061353,0.000061516555,0.0000458572,0.000009028776,0.00016403815,0.78658444,0.18324393,0.000006507099,0.027358057,0.00027531153],"about_ca_topic_score_codex":0.000007913126,"about_ca_topic_score_gemma":0.0000048396955,"teacher_disagreement_score":0.6406954,"about_ca_system_score_codex":0.00015212383,"about_ca_system_score_gemma":0.000045164026,"threshold_uncertainty_score":0.63732904},"labels":[],"label_agreement":null},{"id":"W2279959162","doi":"10.2172/814555","title":"Spinning Reserves from Controllable Packaged Through the Wall Air Conditioner (PTAC) Units","year":2003,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Petroleum Technology Alliance Canada; Oak Ridge National Laboratory; New York State Energy Research and Development Authority; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy; Department of Water Resources; California Energy Commission","keywords":"HVAC; Spinning; Environmental science; Air conditioning; Thermostat; Automotive engineering; Controller (irrigation); Computer science; Engineering; Electrical engineering; Mechanical engineering","score_opus":0.04461198930811242,"score_gpt":0.24658364611486155,"score_spread":0.20197165680674914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279959162","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003082033,0.0061927843,0.0070443344,0.00067542243,0.0055709546,0.0007076382,0.00013057288,0.0011779999,0.97541827],"genre_scores_gemma":[0.47861168,0.014277789,0.004250817,0.00399238,0.0044779186,0.0012310242,0.0054672235,0.0012569326,0.48643425],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99713284,0.00013398647,0.0006838391,0.0004908791,0.00095436344,0.00060409645],"domain_scores_gemma":[0.9978876,0.00025419722,0.0001590162,0.0012349535,0.00037921697,0.00008502468],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005627699,0.0006056836,0.0007104309,0.00011896697,0.00021876302,0.00013897334,0.00054823275,0.00039502254,0.002163553],"category_scores_gemma":[0.0002664316,0.0004422869,0.0001691846,0.0005183709,0.000078820136,0.00024210053,0.0001351459,0.00072562805,0.0002731637],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004196308,0.000012530744,0.00015219033,0.00010288054,0.0010524064,0.000054902383,0.000104321756,0.16483994,0.00005126406,0.001125487,0.8323928,0.00010706104],"study_design_scores_gemma":[0.0005907513,0.000017481414,0.0010863215,0.00017149592,0.00022545941,0.0000061736428,0.00021235805,0.0025481083,0.00061843003,0.0005594889,0.9933797,0.00058424886],"about_ca_topic_score_codex":0.0051955776,"about_ca_topic_score_gemma":0.00087211747,"teacher_disagreement_score":0.48898402,"about_ca_system_score_codex":0.0004693915,"about_ca_system_score_gemma":0.000204098,"threshold_uncertainty_score":0.9998029},"labels":[],"label_agreement":null},{"id":"W2281410527","doi":"10.1007/978-1-4614-0189-6_21","title":"Utility of Supercomputers in Trace-Back Algorithms for City-Sized Distribution Systems","year":2011,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"TRACE (psycholinguistics); Computer science; Algorithm; Philosophy","score_opus":0.04038286455032307,"score_gpt":0.21163206077547211,"score_spread":0.17124919622514906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281410527","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00044220462,0.0006413706,0.60708785,0.000014861486,0.0026764914,0.001329583,0.00035656523,0.00030368578,0.38714737],"genre_scores_gemma":[0.5826348,0.0014057374,0.0124015,0.000034367593,0.0015258564,0.00042373335,0.0037664105,0.00062053074,0.39718702],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986579,0.000010339698,0.0006015743,0.00030140212,0.00017171266,0.00025705926],"domain_scores_gemma":[0.99934274,0.00006170418,0.00006254021,0.00041267223,0.000060719052,0.000059633283],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002424527,0.00033546766,0.0005822943,0.00012883863,0.000013614807,0.000016434024,0.00022192016,0.00030528172,0.00025248402],"category_scores_gemma":[0.0000054946026,0.00034668428,0.00018390079,0.00003548303,0.000040492137,0.00007541854,0.00005375413,0.00016576114,0.000025524074],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026722258,0.0002675968,0.00057536864,0.010427944,0.0023401775,0.000039232233,0.00045350034,0.13151278,0.00007867753,0.6621619,0.14574975,0.046125874],"study_design_scores_gemma":[0.0018229705,0.0000946162,0.0015127107,0.00051984633,0.0001228931,0.000003942262,0.000027132091,0.41247293,0.00033595806,0.002345822,0.57972217,0.0010190251],"about_ca_topic_score_codex":0.0001781404,"about_ca_topic_score_gemma":0.00009668046,"teacher_disagreement_score":0.6598161,"about_ca_system_score_codex":0.00013524854,"about_ca_system_score_gemma":0.0000127799885,"threshold_uncertainty_score":0.9998985},"labels":[],"label_agreement":null},{"id":"W2281918947","doi":"10.1109/ictck.2015.7582641","title":"Effects of bidding data disclosure on unilateral exercise of market power","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transparency (behavior); Bidding; Market power; Business; Publication; Microgrid; Open data; Industrial organization; Electricity market; Microeconomics; Electricity; Computer science; Economics; Marketing; Monopoly; Computer security; Advertising","score_opus":0.015491862478054558,"score_gpt":0.21088320712693537,"score_spread":0.1953913446488808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281918947","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86629504,0.00020997692,0.0024709478,0.000044917313,0.0013167523,0.00025065627,0.000015979036,0.00022458931,0.12917113],"genre_scores_gemma":[0.9982987,0.000020770021,0.0007208103,0.000009026999,0.000025197678,0.000003671912,0.000012065471,0.000022648399,0.0008871149],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941343,0.000013665298,0.000151865,0.00012172406,0.0001734736,0.00012582932],"domain_scores_gemma":[0.9993228,0.00004249614,0.000020925865,0.00054308976,0.000016939606,0.0000537603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016407936,0.00010009899,0.00016339458,0.000068212066,0.0000048402007,0.000006110762,0.00028698612,0.00003236861,0.00007380779],"category_scores_gemma":[0.000027401413,0.00008368092,0.000021302478,0.00012450265,0.00001452868,0.000113177804,0.00017983952,0.000044067903,0.000010199065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021666226,0.00031415233,0.0118943555,0.0017684208,0.000468088,0.00006045973,0.00057796383,0.38353673,0.0063609337,0.0066158874,0.58281213,0.005374184],"study_design_scores_gemma":[0.0057280315,0.00062767457,0.2106799,0.0019245091,0.0003906971,0.0000038344065,0.00042000547,0.49369988,0.21532382,0.0005522569,0.06914165,0.0015077421],"about_ca_topic_score_codex":0.000020333026,"about_ca_topic_score_gemma":0.000005308651,"teacher_disagreement_score":0.5136705,"about_ca_system_score_codex":0.000023248982,"about_ca_system_score_gemma":0.0000047686053,"threshold_uncertainty_score":0.34124088},"labels":[],"label_agreement":null},{"id":"W2282710367","doi":"","title":"Electrical thermal storage optimization for demand side management","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Thermal energy storage; Electricity; Cold storage; Environmental science; Electricity demand; Corporation; Peak demand; Business; Electricity generation; Environmental economics; Engineering; Power (physics); Electrical engineering; Finance; Economics","score_opus":0.007346477797026499,"score_gpt":0.1940419232022192,"score_spread":0.1866954454051927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2282710367","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010275426,0.00015747047,0.91693586,0.000030825133,0.00044617982,0.00025198798,5.5379303e-7,0.00036138634,0.07154031],"genre_scores_gemma":[0.9370558,0.000043571174,0.06070947,0.00011385382,0.00033341884,0.00014665275,0.000016191612,0.00004299864,0.0015380128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939615,0.000007735251,0.000110408655,0.000083641964,0.00009368067,0.00030836207],"domain_scores_gemma":[0.99976444,0.000020546851,0.000009120367,0.0001364257,0.0000088485585,0.000060629784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012361565,0.000099073855,0.000075006625,0.00007226877,0.00003437436,0.000018320834,0.000076893746,0.000031959426,0.00015307812],"category_scores_gemma":[0.0000034925486,0.000092928676,0.000035194007,0.00010433632,0.0000046774867,0.00014839473,0.000026315409,0.000031859272,0.000030721476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039510587,0.000019545718,0.00015831445,0.000027326596,0.00006215703,5.9855637e-7,0.000019500874,0.9823937,0.00007335254,0.0073225703,0.007197783,0.0027211905],"study_design_scores_gemma":[0.00029752537,0.000013436997,0.002707674,0.0000027268925,0.00003549361,5.93528e-7,0.00001330449,0.9672399,0.0010445445,0.000017186878,0.028477428,0.00015017402],"about_ca_topic_score_codex":0.0000011051274,"about_ca_topic_score_gemma":5.977725e-7,"teacher_disagreement_score":0.9267804,"about_ca_system_score_codex":0.00007210808,"about_ca_system_score_gemma":9.3593434e-7,"threshold_uncertainty_score":0.37895215},"labels":[],"label_agreement":null},{"id":"W2285595479","doi":"10.1007/s00267-015-0637-3","title":"Barriers and Solutions to Smart Water Grid Development","year":2015,"lang":"en","type":"article","venue":"Environmental Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport; Government of Ontario; Victorian Water Trust","keywords":"Business; Smart grid; Sustainable development; Environmental economics; Government (linguistics); Computer security; Environmental planning; Computer science; Engineering; Environmental science; Economics; Political science","score_opus":0.008795802069511603,"score_gpt":0.15554512551051705,"score_spread":0.14674932344100544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2285595479","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93755424,0.00029156345,0.016645834,0.00063863216,0.0021680372,0.0008914654,0.000011212963,0.0005390397,0.041259952],"genre_scores_gemma":[0.99202037,0.000060467635,0.0046668346,0.0003766198,0.00008906659,0.00022507946,0.000042212945,0.00005016609,0.0024692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99871945,0.00001597239,0.00020752745,0.00028724613,0.00029756248,0.0004722611],"domain_scores_gemma":[0.9993337,0.0000034236828,0.000008589672,0.00023828402,0.000001565659,0.00041444326],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00021732978,0.0002203858,0.00012385332,0.00014053835,0.00011557411,0.00004320182,0.00016155688,0.000031246127,0.00020995023],"category_scores_gemma":[0.000001535849,0.00020528038,0.000024540308,0.00005825225,0.00003732691,0.00011732236,0.00057061465,0.00006391798,0.001129922],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053466825,0.00018123697,0.014342754,0.0002150534,0.0012431159,0.0002217915,0.005206447,0.7277313,0.0041810954,0.0019991498,0.19644068,0.048183907],"study_design_scores_gemma":[0.00059609447,0.000041935178,0.018657286,0.0000145284075,0.00004104176,0.000003836203,0.0012507589,0.0020432374,0.005489078,0.000056945933,0.9713376,0.00046766506],"about_ca_topic_score_codex":0.0000063277494,"about_ca_topic_score_gemma":0.000009300064,"teacher_disagreement_score":0.7748969,"about_ca_system_score_codex":0.00045871333,"about_ca_system_score_gemma":0.000002213638,"threshold_uncertainty_score":0.9996478},"labels":[],"label_agreement":null},{"id":"W2290795669","doi":"10.1109/cdc.2015.7403142","title":"Optimal control of aggregated heterogeneous thermostatically controlled loads for regulation services","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Flexibility (engineering); Smart grid; Computer science; Population; Grid; Aggregate (composite); Control (management); Frequency regulation; Service (business); Distributed computing; Control engineering; Power (physics); Electric power system; Engineering; Artificial intelligence","score_opus":0.009857023869441471,"score_gpt":0.208357450096424,"score_spread":0.19850042622698252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290795669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37954068,0.00027669207,0.6122688,0.00013332351,0.00039385605,0.0009702512,0.000013185949,0.00040491097,0.0059982557],"genre_scores_gemma":[0.9936616,0.0000041720104,0.0057982206,0.0000825874,0.000062559,0.00010350117,0.000021752932,0.00003138387,0.00023422673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992044,0.000021225207,0.0003127513,0.00011433162,0.000162162,0.00018512005],"domain_scores_gemma":[0.9994459,0.00008814445,0.000052747368,0.00018946704,0.00014576125,0.00007796667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001947789,0.00013252033,0.0002971935,0.000060963906,0.000013923518,0.000019584957,0.00011637386,0.000052921027,0.00005037125],"category_scores_gemma":[0.00002105865,0.00011098733,0.00007601615,0.00007212669,0.000017467975,0.000073261726,0.000014079993,0.000025205947,0.000010941013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042610592,0.000019913246,0.00005168631,0.000056188765,0.00024530623,0.0000012325395,0.00007782213,0.9942308,0.0028436512,0.0010547993,0.00036092024,0.00063157076],"study_design_scores_gemma":[0.008694951,0.00012455483,0.00014272683,0.000013705453,0.0000709117,0.0000015153355,0.000044547214,0.9812634,0.007886028,0.0002085392,0.0014260804,0.0001230536],"about_ca_topic_score_codex":0.000015019359,"about_ca_topic_score_gemma":0.0000168368,"teacher_disagreement_score":0.6141209,"about_ca_system_score_codex":0.00003885387,"about_ca_system_score_gemma":0.000009636522,"threshold_uncertainty_score":0.45259318},"labels":[],"label_agreement":null},{"id":"W2290902163","doi":"","title":"Moving the Needle: Measuring the Performance of an Energy Program Promotional Campaign","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Outreach; Marketing; Incentive; Incentive program; Business; Program Design Language; Promotion (chess); Social marketing; Lift (data mining); Advertising; Public relations; Engineering; Computer science; Economics; Political science","score_opus":0.01974901421403256,"score_gpt":0.20021309786741354,"score_spread":0.18046408365338099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290902163","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96734744,0.000102412174,0.0036557005,0.00012385068,0.0004601174,0.00019591814,5.491474e-7,0.00043756724,0.027676439],"genre_scores_gemma":[0.9980298,0.000009013971,0.0012245784,0.000036966278,0.0002045187,0.00011413294,0.0000035868427,0.000022116692,0.0003552615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920475,0.00003327986,0.00015746868,0.00009512704,0.00031628148,0.00019311703],"domain_scores_gemma":[0.9995154,0.000020042162,0.000023109906,0.00032991794,0.00005773813,0.00005376599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004437292,0.000106412226,0.00007923703,0.00003767963,0.000065061315,0.000036321828,0.00031685768,0.000025551828,0.000023823732],"category_scores_gemma":[0.000012782444,0.00005884355,0.000028724491,0.00019595005,0.00004313516,0.0001759323,0.00006884274,0.00007678249,0.000005318367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038408352,0.000040985473,0.00079258444,0.000022868897,0.000048342306,6.8347475e-7,0.0003825498,0.971344,0.00017281612,0.003256014,0.001017005,0.022918308],"study_design_scores_gemma":[0.00016128145,0.00009799264,0.005577087,0.000015313504,0.000013899413,0.0000066530597,0.00045481656,0.97030646,0.0076110703,0.00006383496,0.015567306,0.00012426061],"about_ca_topic_score_codex":0.00007688449,"about_ca_topic_score_gemma":0.000058337744,"teacher_disagreement_score":0.03068238,"about_ca_system_score_codex":0.000050123006,"about_ca_system_score_gemma":0.00001835788,"threshold_uncertainty_score":0.23995705},"labels":[],"label_agreement":null},{"id":"W2291032744","doi":"10.1109/globalsip.2015.7418373","title":"Power dispatch and load control with generation uncertainty","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"CVAR; Mathematical optimization; Computer science; Electric power system; Demand response; Voltage; Optimization problem; Scheduling (production processes); Relaxation (psychology); Expected shortfall; Control theory (sociology); Power (physics); Control (management); Risk management; Engineering; Electricity; Mathematics; Electrical engineering","score_opus":0.009002758969751404,"score_gpt":0.17827812131699372,"score_spread":0.16927536234724233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291032744","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76721936,0.00018053288,0.16139178,0.00036615063,0.00041895045,0.0001558641,0.0000016167363,0.00035879965,0.06990692],"genre_scores_gemma":[0.99852586,0.0000055567984,0.00068656146,0.00013144307,0.00007720352,0.000014260775,0.0000031370307,0.000011836953,0.0005441258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996436,0.0000059838526,0.000055920736,0.000081101854,0.0001160119,0.00009736734],"domain_scores_gemma":[0.9997903,0.0000054289108,0.000005068253,0.00010380647,0.000031734813,0.000063668485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007352245,0.000070051065,0.00006254585,0.000016796987,0.000011796846,0.00002618417,0.000027991737,0.000018233648,0.00003773544],"category_scores_gemma":[0.0000050870167,0.000051618175,0.0000058129185,0.000041474406,0.0000106710295,0.00007189989,0.00000887068,0.00002655836,0.00001689258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009317594,0.0000054249067,0.0021833146,0.000003736434,0.000038848422,0.0000036289314,0.00009355815,0.971279,0.0003205116,0.0015279923,0.0241135,0.00042114162],"study_design_scores_gemma":[0.0016674387,0.00008683611,0.0032879934,0.000004585515,0.000017790293,0.0000039243,0.00011355627,0.9363485,0.00061286805,0.000043509823,0.05760345,0.00020955825],"about_ca_topic_score_codex":0.00007215379,"about_ca_topic_score_gemma":0.00028251775,"teacher_disagreement_score":0.23130648,"about_ca_system_score_codex":0.00006403091,"about_ca_system_score_gemma":0.000007949869,"threshold_uncertainty_score":0.2104928},"labels":[],"label_agreement":null},{"id":"W2291809240","doi":"","title":"Transportation and Storage under a Dynamic Price Cap Regulation Process","year":2010,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Stylized fact; Process (computing); Economics; Microeconomics; Dynamic pricing; Sequential game; Game theory; Computer science; Macroeconomics","score_opus":0.008189998404242053,"score_gpt":0.2511485506313771,"score_spread":0.24295855222713503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291809240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9854874,0.000017972105,0.0001731623,0.000072924246,0.0001971592,0.00019916336,0.0000034765285,0.0000764837,0.013772264],"genre_scores_gemma":[0.9988167,0.00033493197,0.00031555686,0.000010719885,0.00004360991,0.00006357157,0.000019219822,0.000033723172,0.00036196283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991988,0.000016828313,0.00018287788,0.00022324758,0.000106206586,0.0002720581],"domain_scores_gemma":[0.9996038,0.00006040684,0.000019176437,0.00022151512,0.000026644775,0.000068461086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003702277,0.00009646491,0.00010285346,0.00020254942,0.000053125208,0.000038547594,0.00010687432,0.0000871292,0.00004283978],"category_scores_gemma":[0.000021659447,0.00011245174,0.000017067969,0.00011732691,0.00006211923,0.00017862963,0.000011050361,0.00032516182,0.0000032348341],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001616811,0.000024686715,0.0024558266,0.0001296646,0.000028253622,0.0000052423925,0.00047153508,0.9564433,0.0059690685,0.0013405642,0.00001649427,0.03309917],"study_design_scores_gemma":[0.0004389236,0.000022732718,0.37166876,0.000020818126,0.0000041976677,0.0000028107277,0.00043266828,0.6215559,0.00038683362,0.0009145068,0.0043348754,0.00021696405],"about_ca_topic_score_codex":0.000012961257,"about_ca_topic_score_gemma":0.0014668832,"teacher_disagreement_score":0.36921293,"about_ca_system_score_codex":0.00016591433,"about_ca_system_score_gemma":0.000026270136,"threshold_uncertainty_score":0.45856488},"labels":[],"label_agreement":null},{"id":"W2294730764","doi":"","title":"Exact and Heuristic Methods for Energy Pricing Problem","year":2016,"lang":"en","type":"preprint","venue":"LillOA (Université de Lille (University Of Lille))","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Heuristic; Energy (signal processing); Mathematical optimization; Mathematical economics; Computer science; Economics; Mathematics; Statistics","score_opus":0.00831889484613644,"score_gpt":0.2004432409893156,"score_spread":0.19212434614317916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294730764","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021956334,0.0017445553,0.91892594,0.00077762833,0.0008625385,0.0006659818,0.00016519711,0.0006795967,0.054222245],"genre_scores_gemma":[0.5647861,0.0096263485,0.39314806,0.00014065657,0.00048481798,0.000014217096,0.00026107143,0.00039537024,0.031143343],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99799216,0.00013080343,0.00024357114,0.00075104274,0.00022787276,0.0006545394],"domain_scores_gemma":[0.9982412,0.00034211413,0.0002645904,0.0007242931,0.00012912886,0.00029868394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037332825,0.0005329809,0.00081476907,0.00070093706,0.0003830809,0.000028508013,0.00079567847,0.0005379952,0.00017976476],"category_scores_gemma":[0.000024471507,0.0006750444,0.00035758765,0.0002765002,0.00020144718,0.00023737678,0.0019958178,0.00030286307,0.000006662906],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018355566,0.00051609136,0.002422999,0.016220476,0.012242917,0.000829694,0.023035213,0.18891507,0.040625066,0.16102019,0.12729934,0.42503738],"study_design_scores_gemma":[0.0052728783,0.00039341298,0.0038276853,0.0013466739,0.0017093241,0.000056962515,0.0039055562,0.21321537,0.0029059474,0.011553542,0.7528347,0.0029779586],"about_ca_topic_score_codex":0.000417717,"about_ca_topic_score_gemma":0.00017627879,"teacher_disagreement_score":0.62553537,"about_ca_system_score_codex":0.00090371846,"about_ca_system_score_gemma":0.000073392875,"threshold_uncertainty_score":0.9995701},"labels":[],"label_agreement":null},{"id":"W2294876144","doi":"10.5441/002/edbt.2015.34","title":"Benchmarking Smart Meter Data Analytics","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Smart meter; Smart grid; Benchmark (surveying); Benchmarking; SPARK (programming language); Big data; Analytics; Database; Server; Embedded system; Data analysis; Real-time computing; Data mining; Operating system; Engineering","score_opus":0.11636778911237473,"score_gpt":0.253496275490898,"score_spread":0.13712848637852326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294876144","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017853158,0.00021696906,0.30159092,0.00022529172,0.003238585,0.000113940325,0.00000987739,0.0010641979,0.6756871],"genre_scores_gemma":[0.96508443,0.000027768223,0.031674385,0.0002503073,0.00055408035,0.000005402259,0.0001477214,0.00004492738,0.0022109859],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993797,0.0000074941713,0.00012314488,0.00015022096,0.00016354516,0.00017587833],"domain_scores_gemma":[0.9991053,0.000015948823,0.000007645745,0.0007621495,0.000016983666,0.000091997186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023675626,0.00009170031,0.000088973655,0.00006864313,0.000012233532,0.000038881128,0.00035867383,0.000026381296,0.00016268014],"category_scores_gemma":[0.00001939468,0.000085120584,0.00001508681,0.0001449003,0.000009007294,0.00019042299,0.00027322615,0.000054412616,0.00017093102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015307678,0.000010411766,0.003550897,0.000015321692,0.00014511627,0.000013905897,0.00004321705,0.37918243,0.000035850877,0.0014060336,0.6101723,0.005423033],"study_design_scores_gemma":[0.00010957214,0.000006687871,0.00073788146,0.0000029917949,0.000020988326,0.0000012001964,0.000027995344,0.6689295,0.00014090813,0.000064511805,0.32984793,0.0001098472],"about_ca_topic_score_codex":0.000037552854,"about_ca_topic_score_gemma":0.00009391434,"teacher_disagreement_score":0.94723123,"about_ca_system_score_codex":0.00004832098,"about_ca_system_score_gemma":0.00000646873,"threshold_uncertainty_score":0.34711167},"labels":[],"label_agreement":null},{"id":"W2298696558","doi":"10.3390/en9030202","title":"Realistic Scheduling Mechanism for Smart Homes","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Scheduling (production processes); Electricity; Particle swarm optimization; Heuristic; Power consumption; Reliability engineering; Mathematical optimization; Real-time computing; Power (physics); Operations research; Engineering; Artificial intelligence; Algorithm","score_opus":0.011368437378436277,"score_gpt":0.2047085946835614,"score_spread":0.1933401573051251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2298696558","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37562862,0.00044293943,0.60127705,0.0008884755,0.0042587887,0.00024173033,0.000031940734,0.0022182942,0.015012146],"genre_scores_gemma":[0.9854564,0.00020489565,0.011636018,0.00006119333,0.0003465245,0.00014094323,0.0000070442766,0.000054305692,0.0020926849],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99937016,0.00000660387,0.00013318376,0.00014336874,0.00009702793,0.0002496722],"domain_scores_gemma":[0.9995872,0.0000998508,0.000014913042,0.00022851696,0.00002862169,0.000040902563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008165275,0.0001280169,0.00012195123,0.00008259749,0.000046803663,0.000024666975,0.00013391912,0.000042420306,0.00003681712],"category_scores_gemma":[0.000061507206,0.000095779236,0.000053112737,0.00006363058,0.000017925948,0.000100991376,0.0000373459,0.00002305322,0.000035882207],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062275335,0.0000064426254,0.000041721323,0.000069429865,0.0000914456,0.000003632932,0.000042560998,0.3684555,0.012114421,0.6028744,0.007494924,0.008799308],"study_design_scores_gemma":[0.0024865766,0.00013738548,0.0012167469,0.00035791617,0.00014810105,0.0000074290692,0.0003332715,0.11971893,0.4440711,0.11709394,0.31288204,0.0015465493],"about_ca_topic_score_codex":0.0000135504815,"about_ca_topic_score_gemma":0.000025359463,"teacher_disagreement_score":0.60982776,"about_ca_system_score_codex":0.00005617337,"about_ca_system_score_gemma":0.0000052501537,"threshold_uncertainty_score":0.3905764},"labels":[],"label_agreement":null},{"id":"W2302675721","doi":"10.1109/smartgridcomm.2015.7436325","title":"Distributed demand curtailment via water-filling","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scalability; Computer science; Smart grid; Flexibility (engineering); Demand response; Carbon footprint; Distributed computing; Grid; Peak demand; Aggregate (composite); Reduction (mathematics); Electricity; Engineering; Electrical engineering","score_opus":0.013680544632356809,"score_gpt":0.19133975005177178,"score_spread":0.177659205419415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2302675721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19383837,0.0001299156,0.7745901,0.00021826618,0.0013253902,0.00012626847,0.0000034332147,0.001045431,0.02872286],"genre_scores_gemma":[0.9982219,0.000011056946,0.0010321386,0.000039882554,0.00012267003,0.000018415405,0.00005455234,0.000022450855,0.00047697555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934465,0.000006370372,0.00013784647,0.00010964124,0.00014503079,0.0002564398],"domain_scores_gemma":[0.9996562,0.0000072405833,0.0000051326874,0.00018824358,0.000021660255,0.0001215416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012821067,0.00011220402,0.00009456224,0.000040996543,0.000021440957,0.000028468381,0.00010059821,0.000030985324,0.00013155641],"category_scores_gemma":[0.00000515839,0.00008384383,0.000025163537,0.00006560088,0.000008278262,0.000083156585,0.00005779105,0.00004820584,0.00038643047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002174997,0.000011273382,0.00053016894,0.000013108771,0.000047115616,0.000008795033,0.00009194575,0.97294736,0.0012707936,0.00031213238,0.024313077,0.00045203368],"study_design_scores_gemma":[0.00057079166,0.000035843346,0.0006006429,0.0000146865505,0.000030480775,0.0000046712785,0.00014603758,0.622783,0.08961419,0.00055136485,0.28524172,0.0004065382],"about_ca_topic_score_codex":0.000029499008,"about_ca_topic_score_gemma":0.000014357454,"teacher_disagreement_score":0.8043835,"about_ca_system_score_codex":0.00010228249,"about_ca_system_score_gemma":0.0000021514252,"threshold_uncertainty_score":0.49669108},"labels":[],"label_agreement":null},{"id":"W2302941507","doi":"10.1109/tcsii.2016.2603479","title":"Load Disaggregation Based on Aided Linear Integer Programming","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits & Systems II Express Briefs","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Integer programming; Branch and price; Linear programming; Integer (computer science); Computer science; Mathematical optimization; Mathematics; Algorithm; Programming language","score_opus":0.013888861259593443,"score_gpt":0.20912657189880932,"score_spread":0.19523771063921588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2302941507","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011534305,0.00007061548,0.9794967,0.00013415974,0.0038144558,0.0007586186,0.000053432606,0.0013943419,0.0027433443],"genre_scores_gemma":[0.9964546,0.000022629198,0.0001447564,0.00007253184,0.0003568338,0.00073777715,0.0000058309065,0.00013488831,0.0020701487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975827,0.00010083067,0.00055091555,0.0005245637,0.00070530846,0.0005356793],"domain_scores_gemma":[0.9985945,0.00020135814,0.00008858821,0.0008201659,0.000113905364,0.00018145028],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002915268,0.00041977564,0.00035733747,0.00029726172,0.0002510896,0.000089646055,0.00030599927,0.00018468496,0.00008211487],"category_scores_gemma":[0.00001635352,0.0003504884,0.00017968791,0.00034582065,0.00006135996,0.0003458275,0.0000023648322,0.00024922608,0.00021710734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023979832,0.00016949442,0.000012578416,0.00017167936,0.00011828893,0.000012778422,0.00026142228,0.9359874,0.010298095,0.00013293703,0.0012999907,0.051511332],"study_design_scores_gemma":[0.0055071926,0.0007430619,0.00019455422,0.005189895,0.00023928416,0.000029630157,0.0002783316,0.48152456,0.16425213,0.00002097593,0.33976153,0.0022588652],"about_ca_topic_score_codex":0.00012546842,"about_ca_topic_score_gemma":0.000036540918,"teacher_disagreement_score":0.9849203,"about_ca_system_score_codex":0.0006326318,"about_ca_system_score_gemma":0.000049305927,"threshold_uncertainty_score":0.99989474},"labels":[],"label_agreement":null},{"id":"W2308835159","doi":"10.1109/smartgridcomm.2015.7436301","title":"An autonomous demand response program in smart grid with foresighted users","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Demand response; Computer science; Inefficiency; Nash equilibrium; Smart grid; Partition (number theory); Grid; Subgame perfect equilibrium; Best response; Load management; On demand; Response time; Game theory; Microeconomics; Economics; Engineering; Electricity","score_opus":0.0138713102515114,"score_gpt":0.2273992619304073,"score_spread":0.2135279516788959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2308835159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9823088,0.00003139015,0.0061638425,0.00009635342,0.00026348527,0.0003799267,9.0953347e-7,0.0012570482,0.009498227],"genre_scores_gemma":[0.98800623,0.000002586478,0.011262567,0.000050591414,0.000060170176,0.00015441616,0.000013327321,0.000046135156,0.00040396713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991481,0.000055216595,0.00015650367,0.00018391422,0.00015950865,0.0002967934],"domain_scores_gemma":[0.99943984,0.00002409484,0.000012007592,0.0003332697,0.000024747726,0.00016605378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003621419,0.00015334235,0.0001339756,0.00018150185,0.000015916134,0.000053011543,0.00015262306,0.000049861534,0.000023223842],"category_scores_gemma":[0.00001325589,0.0001258893,0.000015330892,0.00028987587,0.00002468184,0.00022369776,0.000022851878,0.00008315472,0.000031289597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049905136,0.00011332441,0.024486125,0.00001713036,0.000048383754,0.00010900975,0.00040400968,0.9631321,0.00012425451,0.00033875738,0.008893443,0.0018344333],"study_design_scores_gemma":[0.0025287066,0.0010983947,0.1746843,0.000030399116,0.000024288025,0.00001172717,0.0004258994,0.68549883,0.0023342874,0.00007869271,0.13268597,0.0005985249],"about_ca_topic_score_codex":0.0001122932,"about_ca_topic_score_gemma":0.0012118344,"teacher_disagreement_score":0.27763328,"about_ca_system_score_codex":0.00016106266,"about_ca_system_score_gemma":0.00003079921,"threshold_uncertainty_score":0.51336163},"labels":[],"label_agreement":null},{"id":"W2309617675","doi":"10.1109/smartgridcomm.2015.7436368","title":"Combining electric vehicle and rechargeable battery for household load hiding","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Battery (electricity); Flexibility (engineering); Electric vehicle; Electricity; Smart grid; Real-time computing; Automotive engineering; Electrical engineering; Engineering","score_opus":0.04408250857343531,"score_gpt":0.20718942261244463,"score_spread":0.16310691403900932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2309617675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87836665,0.00093322067,0.07030367,0.0002899305,0.0011901481,0.00034698512,0.0000024310475,0.0015404373,0.047026556],"genre_scores_gemma":[0.9963486,0.000035189452,0.0022298126,0.00016714203,0.0001127234,0.000045796256,0.0000025876423,0.000043672488,0.0010144619],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937487,0.0000066142425,0.00011792016,0.00013527116,0.00010793559,0.0002573732],"domain_scores_gemma":[0.99969333,0.00004952821,0.000011142621,0.00013713435,0.000022041839,0.00008680031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002587098,0.00010123148,0.00011174322,0.00007348573,0.00003604846,0.00004610054,0.00007241721,0.000037700283,0.0000063936254],"category_scores_gemma":[0.000029407222,0.0001043356,0.000018833687,0.0001398895,0.000004727638,0.00013854087,0.000035442128,0.000057593843,0.0000126271125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040998166,0.00005382101,0.006233649,0.00023860781,0.00020501384,0.000011914726,0.00046432327,0.45486274,0.04117084,0.0096769035,0.47763103,0.009410157],"study_design_scores_gemma":[0.0014488873,0.000105510306,0.0006415496,0.000024987196,0.00002957706,0.000005371429,0.00012561106,0.87508667,0.041002296,0.0008493858,0.08029317,0.00038697472],"about_ca_topic_score_codex":0.000024377812,"about_ca_topic_score_gemma":0.000005397326,"teacher_disagreement_score":0.42022392,"about_ca_system_score_codex":0.00012447263,"about_ca_system_score_gemma":0.0000107665865,"threshold_uncertainty_score":0.42546824},"labels":[],"label_agreement":null},{"id":"W2310724192","doi":"10.1109/smartgridcomm.2015.7436373","title":"Energy storage management in smart homes based on resident activity of daily life recognition","year":2015,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Energy management; Energy storage; Computer science; Energy management system; Home automation; Piecewise; Battery (electricity); Energy (signal processing); Mathematical optimization; Reliability engineering; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.024352956784385565,"score_gpt":0.21100837676094022,"score_spread":0.18665541997655466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2310724192","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6395097,0.00007913387,0.067085706,0.0003103359,0.001221453,0.00029708873,0.0000068526338,0.0005022583,0.2909875],"genre_scores_gemma":[0.9979154,0.000044419096,0.0010566192,0.00016095162,0.000048010592,0.00006284565,0.000018236715,0.000030452065,0.0006630494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989906,0.000055537297,0.00021597705,0.00019850278,0.00033088602,0.00020852791],"domain_scores_gemma":[0.9994571,0.00003896936,0.00003368435,0.0003364709,0.000026263064,0.00010746236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002927763,0.00015710929,0.00018423272,0.00039329132,0.000010911673,0.00001615525,0.00012685005,0.000050036437,0.0000960707],"category_scores_gemma":[0.000018725585,0.00016211787,0.000042314783,0.00028787964,0.000014170588,0.00012331248,0.000053216852,0.000069982714,0.000034715154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011512861,0.00014867501,0.0007809619,0.000114448114,0.00007973863,0.000039233313,0.000060315127,0.9512692,0.00014285094,0.0007621757,0.028278792,0.018208446],"study_design_scores_gemma":[0.0043241344,0.00032057724,0.074191816,0.00021387346,0.000068657464,6.3427285e-7,0.0005299438,0.8663082,0.024945304,0.0007335792,0.02751735,0.0008459286],"about_ca_topic_score_codex":0.00035512343,"about_ca_topic_score_gemma":0.00052678754,"teacher_disagreement_score":0.35840574,"about_ca_system_score_codex":0.00022747628,"about_ca_system_score_gemma":0.000014019667,"threshold_uncertainty_score":0.66109747},"labels":[],"label_agreement":null},{"id":"W2312538844","doi":"","title":"Demand Response Implementation for Remote Communities Installation Challenges and Initial Results for the Village of Hartley Bay","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Thermostat; Bay; Peak demand; Service (business); Environmental science; Operations management; Environmental economics; Engineering; Economics; Electricity; Civil engineering; Electrical engineering; Economy","score_opus":0.0814053151306225,"score_gpt":0.2856827123619326,"score_spread":0.2042773972313101,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312538844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7332122,0.0011134521,0.24353907,0.0007064887,0.0005324173,0.0017438408,0.00012989639,0.00023110367,0.018791579],"genre_scores_gemma":[0.99342906,0.00074195024,0.005626725,0.000025615995,0.0000435459,0.0000425886,0.00002893017,0.000016839285,0.00004475723],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952275,0.000040532286,0.00020816599,0.000062432235,0.00005979117,0.000106358435],"domain_scores_gemma":[0.99921775,0.0005024584,0.0000380571,0.00018080059,0.000045577934,0.000015362475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066597224,0.000079114034,0.00008521353,0.00006681627,0.00007109326,0.000010084954,0.00007472976,0.000029089302,0.000010731356],"category_scores_gemma":[0.000032339492,0.0000626878,0.000025649824,0.000025858668,0.000030068983,0.00009894701,0.00003368864,0.000023617966,3.468153e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.021030948,0.00013413555,0.00029538316,0.0022741659,0.0017995702,0.0000029394494,0.19121464,0.084712446,0.009249073,0.095436536,0.014364266,0.5794859],"study_design_scores_gemma":[0.012648963,0.0017084512,0.13641472,0.00015042057,0.0003010226,0.000006181271,0.07556329,0.56562215,0.08376294,0.0075300727,0.1154467,0.0008451045],"about_ca_topic_score_codex":0.00009122089,"about_ca_topic_score_gemma":0.0018096372,"teacher_disagreement_score":0.57864076,"about_ca_system_score_codex":0.000015375439,"about_ca_system_score_gemma":0.0000044268136,"threshold_uncertainty_score":0.25563344},"labels":[],"label_agreement":null},{"id":"W2312898148","doi":"10.1364/acpc.2013.aw4h.3","title":"Risk Analysis of Integrated Fiber-Wireless Smart Grid Communications Infrastructures Powered by Positive Energy Buildings","year":2013,"lang":"en","type":"article","venue":"Asia Communications and Photonics Conference 2013","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Smart grid; Intermittency; Wireless; Computer science; Grid; Telecommunications; Fiber; Power grid; Power (physics); Electrical engineering; Engineering","score_opus":0.007165643206650832,"score_gpt":0.20830884515367282,"score_spread":0.20114320194702198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312898148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8757737,0.012674302,0.03265646,0.0029957355,0.0003508544,0.0012566099,0.0032149141,0.00072176714,0.07035566],"genre_scores_gemma":[0.9615796,0.02683233,0.009567364,0.000054236927,0.0000036707181,0.00020203678,0.0015827345,0.000029859331,0.00014814176],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986999,0.00018042805,0.00049929763,0.00021983318,0.00014953382,0.0002510133],"domain_scores_gemma":[0.9962643,0.00029453213,0.00020201363,0.0027576233,0.00036040036,0.000121129895],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015423763,0.0002646362,0.0004272117,0.00034622056,0.00025052947,0.00013118242,0.001538573,0.00013338383,0.00053761894],"category_scores_gemma":[0.000019289591,0.00026494995,0.00011021368,0.00089970743,0.0003820779,0.00024266925,0.0006137502,0.000341672,0.00001329454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055313394,0.0013539733,0.040884,0.00018138377,0.029388698,0.0000015830465,0.009501524,0.030634176,0.06592861,0.35046014,0.1640686,0.307542],"study_design_scores_gemma":[0.0002815016,0.000054945205,0.018826218,0.000045850047,0.00073920254,0.0000014054564,0.0006491676,0.8547427,0.0020819153,0.0010145374,0.12113011,0.0004324561],"about_ca_topic_score_codex":0.016664412,"about_ca_topic_score_gemma":0.002543039,"teacher_disagreement_score":0.82410854,"about_ca_system_score_codex":0.00007122557,"about_ca_system_score_gemma":0.000038807946,"threshold_uncertainty_score":0.9999803},"labels":[],"label_agreement":null},{"id":"W2313558877","doi":"10.1109/tia.2016.2535268","title":"Performance Evaluation of the ZIP Model-Phaselet Frame Approach for Identifying Appliances in Residential Loads","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada; New Brunswick Innovation Foundation","keywords":"Bar (unit); Frame (networking); Energy (signal processing); Power (physics); Polynomial; Value (mathematics); Algorithm; Computer science; Mathematics; Applied mathematics; Statistics; Mathematical analysis; Telecommunications","score_opus":0.06118744688760841,"score_gpt":0.29134060678845897,"score_spread":0.23015315990085056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313558877","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10794896,0.000015027386,0.88925046,0.00011514985,0.00018217966,0.0011154088,0.00006232787,0.0000839223,0.0012265723],"genre_scores_gemma":[0.99158317,0.000025471352,0.0022795862,0.000014493989,0.000075279466,0.005749097,0.0000046178357,0.000028820737,0.00023946287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882597,0.000030518768,0.00033301403,0.00024071182,0.00036332267,0.00020644603],"domain_scores_gemma":[0.99926305,0.00005551299,0.00006370582,0.00049214467,0.00008928089,0.000036324833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004030199,0.00014279313,0.00012694187,0.00015569862,0.00014493843,0.000016770386,0.00031377768,0.00020723967,0.000034551584],"category_scores_gemma":[0.0000036641475,0.000112184345,0.00007636657,0.00048719608,0.00006966595,0.00019652504,0.0000023789582,0.0002729858,0.0000060068605],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007754818,0.000075657445,0.000049576473,0.000044341006,0.000029420931,9.5597965e-9,0.000040556886,0.9760858,0.0053357556,0.00018279329,0.0002546188,0.017893707],"study_design_scores_gemma":[0.00073467806,0.000010397713,0.00073522166,0.0000645203,0.000095541865,7.706496e-7,0.00005966839,0.918471,0.0788783,0.00029569972,0.0004952073,0.00015904225],"about_ca_topic_score_codex":0.000009911012,"about_ca_topic_score_gemma":0.00002178013,"teacher_disagreement_score":0.8869709,"about_ca_system_score_codex":0.00021264929,"about_ca_system_score_gemma":0.00005212819,"threshold_uncertainty_score":0.4574745},"labels":[],"label_agreement":null},{"id":"W2314126258","doi":"10.1109/tsg.2016.2530630","title":"An Analytical Method for Probabilistic Modeling of the Steady-State Behavior of Secondary Residential System","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Demand response; Smart grid; Monte Carlo method; Grid; Transformer; Computer science; Reliability engineering; Transformation (genetics); Covariance; Distributed generation; Mathematical optimization; Engineering; Control engineering; Electricity; Mathematics; Renewable energy","score_opus":0.02150362903357787,"score_gpt":0.2607816910166597,"score_spread":0.23927806198308185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314126258","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12960158,0.000007379891,0.8674295,0.000029394294,0.0018955349,0.0004841451,0.00023886458,0.00012807861,0.00018551978],"genre_scores_gemma":[0.99539083,0.0000047985127,0.004130452,0.0000057231496,0.00008586662,0.00021995346,0.0000018507151,0.000048892318,0.000111609435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868023,0.00008529641,0.00050941604,0.00023628073,0.00025586004,0.00023294083],"domain_scores_gemma":[0.9990683,0.00013739715,0.0000588437,0.00057421956,0.000091213646,0.00006999894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003609532,0.00017446167,0.00028306106,0.00015547551,0.00007468138,0.0000118718235,0.00026352645,0.00006971093,0.00003317452],"category_scores_gemma":[0.0000049658233,0.00012016466,0.0002130443,0.00016302746,0.000053837688,0.00014194024,0.0000023141906,0.000117049065,0.0000039835427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059152335,0.00008397886,0.000015352094,0.00027613825,0.00011126835,9.796934e-7,0.00007333121,0.98597103,0.00912715,0.00024163642,0.00008658159,0.0039534075],"study_design_scores_gemma":[0.0007036702,0.00012464606,0.00021494085,0.00015193822,0.0003432351,0.0000054599554,0.000088973204,0.93490046,0.06311415,0.000052192237,0.0001223829,0.00017796968],"about_ca_topic_score_codex":0.000076618206,"about_ca_topic_score_gemma":0.0001721357,"teacher_disagreement_score":0.8657893,"about_ca_system_score_codex":0.00013387454,"about_ca_system_score_gemma":0.00003900003,"threshold_uncertainty_score":0.49001724},"labels":[],"label_agreement":null},{"id":"W2314419339","doi":"10.1145/2897165","title":"Computational Methods for Residential Energy Cost Optimization in Smart Grids","year":2016,"lang":"en","type":"review","venue":"ACM Computing Surveys","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Energy consumption; Scheduling (production processes); Grid; Reliability engineering; Risk analysis (engineering); Mathematical optimization; Electrical engineering; Engineering; Business","score_opus":0.04990963036584008,"score_gpt":0.3581827172885167,"score_spread":0.30827308692267663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314419339","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.1979162e-7,0.44131514,0.55615175,0.000009323701,0.0018096463,0.00031319403,0.00002117321,0.00020951226,0.000170165],"genre_scores_gemma":[0.0000068865843,0.7548336,0.24290614,0.000030399882,0.00070269115,0.0001539829,0.0010241162,0.00018941588,0.00015278571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961027,0.0015606757,0.0010368723,0.0005573035,0.00021443452,0.0005280381],"domain_scores_gemma":[0.99538666,0.0035879856,0.0002179611,0.0006249774,0.00010071438,0.00008171711],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0038110581,0.00052758213,0.0012480102,0.0005921936,0.00009255824,0.00009995547,0.0007711237,0.00029477128,0.00004711088],"category_scores_gemma":[0.000529336,0.00050408667,0.00031405545,0.00057059864,0.000035682257,0.00010230783,0.0003876765,0.00020574416,0.000017135717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.078988e-7,0.0000071389545,0.0000036713195,0.0010518535,0.000096968804,0.0000018098525,0.000004169866,0.49836165,2.2258524e-8,0.00015436011,0.0036187319,0.49669904],"study_design_scores_gemma":[0.00027123067,0.00001025491,0.000036198155,0.0023776419,0.00006800212,0.0000043435925,6.7727836e-7,0.36535865,6.4792124e-7,0.00015084236,0.63131684,0.00040466528],"about_ca_topic_score_codex":0.0000635965,"about_ca_topic_score_gemma":0.000031820884,"teacher_disagreement_score":0.6276981,"about_ca_system_score_codex":0.00041744864,"about_ca_system_score_gemma":0.00009096223,"threshold_uncertainty_score":0.9997411},"labels":[],"label_agreement":null},{"id":"W2314484518","doi":"10.1007/s11235-016-0156-4","title":"ICT and renewable energy: a way forward to the next generation telecom base stations","year":2016,"lang":"en","type":"article","venue":"Telecommunication Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":86,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Information and Communications Technology; Computer science; Telecommunications; Efficient energy use; Environmental economics; Scope (computer science); Greenhouse gas; Business; Electrical engineering; Engineering; Economics; World Wide Web","score_opus":0.04285820960863718,"score_gpt":0.22756587370632989,"score_spread":0.1847076640976927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314484518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07514183,0.004413044,0.894425,0.00756887,0.0015690593,0.0010503846,0.00004373683,0.0011389672,0.014649149],"genre_scores_gemma":[0.9944431,0.0008647159,0.0014805101,0.00017874823,0.00023308893,0.0005306021,0.000037022448,0.000043894725,0.0021882716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989621,0.00014927407,0.00033296258,0.0001726254,0.00016331549,0.00021973126],"domain_scores_gemma":[0.9984954,0.0001640646,0.000055029752,0.001121105,0.000074952964,0.00008947239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004172726,0.0001482982,0.00014446856,0.00013046773,0.00022049372,0.0001524692,0.00038978,0.000049757844,0.00003101245],"category_scores_gemma":[0.000042582302,0.0000997267,0.000028901986,0.0002698442,0.000022236243,0.00026494026,0.00011499798,0.000052011645,0.00007833082],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069127536,0.0000319502,0.00033343004,0.00004383855,0.00015033061,7.461561e-7,0.0006929835,0.65665406,0.032164834,0.008453637,0.25882727,0.042639997],"study_design_scores_gemma":[0.00030238877,0.000032388052,0.0008987847,0.000055308996,0.000021811327,0.0000063673538,0.00022731011,0.19473596,0.0026990408,0.00005232702,0.8007253,0.00024306487],"about_ca_topic_score_codex":0.000914728,"about_ca_topic_score_gemma":0.0020611957,"teacher_disagreement_score":0.91930133,"about_ca_system_score_codex":0.00015175153,"about_ca_system_score_gemma":0.00001264715,"threshold_uncertainty_score":0.40667367},"labels":[],"label_agreement":null},{"id":"W2315740735","doi":"10.1109/tsg.2016.2526651","title":"Resilient Distributed Real-Time Demand Response via Population Games","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Demand response; Software deployment; Scalability; Dispatchable generation; Flexibility (engineering); Computer science; Resilience (materials science); Distributed computing; Population; Smart grid; Consumption (sociology); Blackout; Game theory; Grid; Electric power system; Distributed generation; Power (physics); Microeconomics; Electricity; Economics; Engineering; Electrical engineering; Renewable energy","score_opus":0.006442449378886083,"score_gpt":0.20197708372905998,"score_spread":0.1955346343501739,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315740735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30434987,0.0000115612,0.691776,0.0003900294,0.0019529116,0.00020444754,0.00013854659,0.00082488457,0.00035178135],"genre_scores_gemma":[0.997622,0.00012661991,0.00044619554,0.00002895925,0.00016655709,0.00010055116,0.000026854645,0.00006686036,0.0014153742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99851626,0.00012283084,0.00035689166,0.00032539954,0.00030088314,0.0003777472],"domain_scores_gemma":[0.99901325,0.00021968996,0.000038122354,0.00054792856,0.000038361202,0.00014263175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003048132,0.0002651489,0.00022361135,0.00026065228,0.00014210006,0.000030706793,0.00015401747,0.00011168887,0.00035714905],"category_scores_gemma":[0.000009722807,0.00021958498,0.00012629309,0.00030814795,0.00004041432,0.0002233693,0.0000019594768,0.00011521858,0.0006315401],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006195985,0.00010559362,0.00019343637,0.000025380916,0.00015536798,0.00001885656,0.00005120677,0.9097098,0.06902776,0.00001725208,0.011942057,0.0081337],"study_design_scores_gemma":[0.0063075596,0.0009339356,0.19584581,0.0006186191,0.0004997367,0.000075063064,0.000058394453,0.22829172,0.4435051,0.0004328966,0.1204817,0.0029494541],"about_ca_topic_score_codex":0.000071655864,"about_ca_topic_score_gemma":0.000060063743,"teacher_disagreement_score":0.6932722,"about_ca_system_score_codex":0.0003855091,"about_ca_system_score_gemma":0.00001107325,"threshold_uncertainty_score":0.8954416},"labels":[],"label_agreement":null},{"id":"W2320639967","doi":"10.1109/tste.2016.2543024","title":"Optimal Control of Energy Storage in a Microgrid by Minimizing Conditional Value-at-Risk","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"CVAR; Microgrid; Mathematical optimization; Expected shortfall; Stochastic optimization; Stochastic control; Computer science; Electricity; Demand response; Electricity pricing; Energy storage; Optimal control; Optimization problem; Electricity market; Control (management); Engineering; Power (physics); Economics; Mathematics; Risk management","score_opus":0.003154841162092742,"score_gpt":0.1756939718664597,"score_spread":0.17253913070436697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320639967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056299955,0.00045304876,0.94121736,0.00010347425,0.0003978156,0.0000923772,0.00018182381,0.00019411152,0.0010600548],"genre_scores_gemma":[0.99249387,0.0005740273,0.0003492977,0.000090217225,0.00006271864,0.00024853658,0.00001597596,0.00008118433,0.00608416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980814,0.000098666016,0.00047686597,0.0003623863,0.00030975873,0.0006709601],"domain_scores_gemma":[0.9990744,0.00025703874,0.00008675676,0.00036326193,0.00008825791,0.00013031145],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019113418,0.0003200489,0.00036508185,0.0005265052,0.00012740091,0.000019998763,0.00022646433,0.00015207965,0.00031411264],"category_scores_gemma":[0.000007708191,0.00029904768,0.00016295673,0.0004053033,0.00010381896,0.00025797312,0.0000045530596,0.00012630654,0.000007760919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013999769,0.00015755913,0.000023358043,0.000039051913,0.00019865509,0.00005587203,0.00003849361,0.9775713,0.012528148,0.002994716,0.003735529,0.002517319],"study_design_scores_gemma":[0.009455751,0.0004411275,0.0002176495,0.00013948516,0.00020796145,0.00002629029,0.00071997184,0.14186169,0.52565074,0.000623137,0.3193532,0.0013029806],"about_ca_topic_score_codex":0.0007651708,"about_ca_topic_score_gemma":0.0001272326,"teacher_disagreement_score":0.940868,"about_ca_system_score_codex":0.0008561372,"about_ca_system_score_gemma":0.00004928222,"threshold_uncertainty_score":0.9999462},"labels":[],"label_agreement":null},{"id":"W2320825822","doi":"10.2316/journal.203.2012.2.203-4909","title":"POWER FLOW ANALYSIS OF A POWER SYSTEM USING SIMPLIFIED NEWTON–RAPHSON METHOD","year":2012,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Power flow; Newton's method; Electric power system; Power (physics); Flow (mathematics); Control theory (sociology); Power-flow study; Mathematics; Computer science; Applied mathematics; Mathematical optimization; Mechanics; Physics; Nonlinear system; Thermodynamics; Artificial intelligence","score_opus":0.010832926168625072,"score_gpt":0.253847219146736,"score_spread":0.24301429297811095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320825822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31669104,0.0043336484,0.64958715,0.000052303625,0.015576796,0.00005660048,0.00004254389,0.000080687045,0.013579208],"genre_scores_gemma":[0.9978013,0.000044068798,0.001588404,0.000028995059,0.00035352746,0.0000028795382,0.000005750261,0.00003556732,0.00013951444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99785,0.00010955896,0.0009055309,0.00013323619,0.00072466943,0.00027698147],"domain_scores_gemma":[0.99877125,0.00010210277,0.0003699682,0.00020132004,0.0003718873,0.00018344347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007772736,0.0002252535,0.00058772485,0.0011278804,0.000030198493,0.00007872014,0.00032595015,0.00010555737,0.00007471415],"category_scores_gemma":[0.000023215345,0.00019770769,0.00031761747,0.00042010573,0.000023749166,0.00038744655,0.00006938737,0.00011861798,0.0000015464074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004887168,0.000053959262,0.004353994,0.000039044655,0.007788045,0.00003498088,0.00078697596,0.9736906,0.0026123405,0.009197243,0.0011097391,0.00028419957],"study_design_scores_gemma":[0.0015623441,0.00015478408,0.020942433,0.0005872027,0.0017895766,0.00076682866,0.0034380283,0.87625986,0.0021756794,0.000021492919,0.091543995,0.00075777614],"about_ca_topic_score_codex":0.00020468768,"about_ca_topic_score_gemma":0.000005729518,"teacher_disagreement_score":0.68111026,"about_ca_system_score_codex":0.00024834342,"about_ca_system_score_gemma":0.000017687922,"threshold_uncertainty_score":0.8062286},"labels":[],"label_agreement":null},{"id":"W2321179969","doi":"10.1049/iet-gtd.2015.0098","title":"Performance optimisation for novel green plug‐energy economizer in micro‐grids based on recent heuristic algorithm","year":2015,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Economizer; Heuristic; Computer science; Algorithm; Plug-in; Meta heuristic; Mathematical optimization; Engineering; Artificial intelligence; Mathematics; Mechanical engineering","score_opus":0.029467186438751982,"score_gpt":0.218734363238309,"score_spread":0.189267176799557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321179969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022185694,0.00008186142,0.9751926,0.00065470574,0.0008683144,0.00035849612,0.00018043554,0.00017668557,0.00030119298],"genre_scores_gemma":[0.9604752,0.00034083513,0.02524444,0.00027821734,0.0007569878,0.0005279811,0.0120165115,0.00007911795,0.0002806802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861234,0.000039233557,0.00046849184,0.0003430999,0.00023497785,0.00030183667],"domain_scores_gemma":[0.9993912,0.000030478877,0.000058698915,0.00023370169,0.00012719812,0.00015869855],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003779512,0.0002556612,0.00020873772,0.00013999997,0.0000914217,0.00005448896,0.00011948757,0.00015013391,0.000049260052],"category_scores_gemma":[0.00001771627,0.00026946267,0.00006880209,0.00023943423,0.00001791517,0.00021408954,0.0000073901992,0.000099863224,0.000012508749],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008187338,0.00009421405,0.000035138313,0.000032586217,0.000011407079,5.848962e-7,0.000028342325,0.9031788,0.0038425527,0.00012497469,0.0095560895,0.08301342],"study_design_scores_gemma":[0.002374198,0.00011404917,0.0004961724,0.000033889235,0.000019382556,8.915213e-7,0.0000074918753,0.82940805,0.03404081,0.000023591794,0.13322638,0.00025512103],"about_ca_topic_score_codex":0.00003937411,"about_ca_topic_score_gemma":0.000018529974,"teacher_disagreement_score":0.9499482,"about_ca_system_score_codex":0.00070959114,"about_ca_system_score_gemma":0.000073019975,"threshold_uncertainty_score":0.99997574},"labels":[],"label_agreement":null},{"id":"W2322852481","doi":"10.1109/tsg.2016.2535198","title":"Discrete-Event Systems-Based Power Admission Control of Thermal Appliances in Smart Buildings","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"Mitacs; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); MATLAB; Computer science; Reduction (mathematics); Context (archaeology); Real-time computing; Control (management); Discrete event simulation; Event (particle physics); Embedded system; Control engineering; Reliability engineering; Automotive engineering; Simulation; Engineering; Operating system","score_opus":0.007209732936453751,"score_gpt":0.21096157276171776,"score_spread":0.20375183982526401,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322852481","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18488905,0.000115571274,0.8100269,0.00027594523,0.0031789073,0.00043031512,0.000079499296,0.00024450058,0.00075932505],"genre_scores_gemma":[0.99916226,0.000036737718,0.0001462768,0.000048887407,0.000086078304,0.00023874459,0.0000017989105,0.000057106157,0.00022210181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998427,0.000063123145,0.00049236295,0.0002974134,0.0003416047,0.0003785444],"domain_scores_gemma":[0.9992076,0.00015088414,0.00006750667,0.00041108907,0.00003667504,0.0001262334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025894772,0.00027878536,0.00035345092,0.00029565828,0.000055883793,0.000019314088,0.0002232347,0.00011073538,0.00020547213],"category_scores_gemma":[0.000004327426,0.00020892006,0.00015579643,0.0002662866,0.00005815126,0.00017002368,0.0000014467845,0.0001594702,0.000061535684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015479734,0.00012752866,0.000826894,0.00010095662,0.000093961025,0.000008710856,0.00003939664,0.9551856,0.040152606,0.00006771276,0.00054842903,0.0026933954],"study_design_scores_gemma":[0.015031391,0.0010587774,0.017212769,0.0031096288,0.00030309905,0.00001243532,0.00025491713,0.21362768,0.6158067,0.000031834817,0.13127807,0.0022727188],"about_ca_topic_score_codex":0.000088068664,"about_ca_topic_score_gemma":0.000049752714,"teacher_disagreement_score":0.81427324,"about_ca_system_score_codex":0.0001839155,"about_ca_system_score_gemma":0.000027121343,"threshold_uncertainty_score":0.85195124},"labels":[],"label_agreement":null},{"id":"W2323851428","doi":"10.1061/40927(243)534","title":"Water Demand and Supply Management from Utilities' Perspective","year":2007,"lang":"en","type":"article","venue":"World Environmental and Water Resources Congress 2007","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Suncor Energy (Canada)","funders":"","keywords":"Computer science; Demand management; Demand forecasting; Supply and demand; Perspective (graphical); Operator (biology); Demand patterns; Load management; Risk analysis (engineering); Water supply; Environmental economics; Operations research; Business; Engineering; Economics; Environmental engineering; Microeconomics","score_opus":0.0034348690062000844,"score_gpt":0.16339197646197132,"score_spread":0.15995710745577124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323851428","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.970371,0.0017017022,0.0001743048,0.00010155214,0.00037301646,0.00020223187,0.000021691769,0.00012225825,0.026932228],"genre_scores_gemma":[0.9870279,0.00039389057,0.00019604634,0.00015752003,0.00017577488,0.000018361667,0.00005133619,0.000045701458,0.011933472],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986433,0.000018447527,0.00022541286,0.00037135632,0.00020805733,0.00053344446],"domain_scores_gemma":[0.99959034,0.000021173764,0.00001182486,0.0002165777,0.0000020804248,0.00015801017],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00016898954,0.00028389803,0.00019521148,0.00016823021,0.00012659181,0.00007625588,0.00011587813,0.000049876187,0.0009983068],"category_scores_gemma":[2.711681e-7,0.00020090069,0.000037986974,0.000025495776,0.00022218878,0.0001310689,0.000309848,0.0001253586,0.00012932089],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016673146,0.00094937946,0.6320083,0.0010811153,0.0070035807,0.004318355,0.108818896,0.03540829,0.061024483,0.004311666,0.02681277,0.11659586],"study_design_scores_gemma":[0.0016107075,0.000052199062,0.1589385,0.00005896442,0.00014475879,0.000016984715,0.005967054,0.0015183979,0.063287616,0.0012079226,0.7663499,0.0008469772],"about_ca_topic_score_codex":0.00010266553,"about_ca_topic_score_gemma":0.0000856309,"teacher_disagreement_score":0.7395372,"about_ca_system_score_codex":0.00011067354,"about_ca_system_score_gemma":1.5610918e-7,"threshold_uncertainty_score":0.99991494},"labels":[],"label_agreement":null},{"id":"W2326493911","doi":"10.14288/1.0108295","title":"Electrical Energy Conservation Opportunities for plug loads and lighting in UBC Office Buildings","year":2011,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"BC Hydro","keywords":"Energy conservation; Architectural engineering; Electric light; Spark plug; Plug and play; Engineering; Civil engineering; Environmental science; Computer science; Electrical engineering; Mechanical engineering","score_opus":0.020800426512762406,"score_gpt":0.1551351329222422,"score_spread":0.1343347064094798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326493911","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98705,0.00013829929,0.008929959,0.000034556444,0.00009286778,0.000093147726,0.000012638768,0.00011082853,0.0035376854],"genre_scores_gemma":[0.99748087,0.00027398448,0.0017397502,0.000046909474,0.000019695843,0.0000014697483,0.000011162544,0.000015914775,0.00041025202],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994253,0.000014377706,0.000107581545,0.0001732405,0.0000871825,0.00019232105],"domain_scores_gemma":[0.9997099,0.000042181502,0.00003907526,0.00009723762,0.000054711418,0.000056888723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011979555,0.00004027646,0.0001588713,0.00008437411,0.00006682733,0.000030960604,0.00012524877,0.00007028305,0.000019417519],"category_scores_gemma":[0.000014736894,0.00014927778,0.000036123085,0.00016458545,0.0000655918,0.00024358742,0.000053453037,0.00005399112,5.493568e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080658036,0.00017485832,0.03792532,0.00046491515,0.000199162,0.00033902295,0.00088961207,0.0010657285,0.0008080499,0.00094694796,0.029708974,0.9273968],"study_design_scores_gemma":[0.00094608316,0.00007257193,0.9616025,0.000103171486,0.00003354861,0.00001630769,0.00090793666,0.028210582,0.000027558712,0.00027325982,0.007555206,0.00025126868],"about_ca_topic_score_codex":0.049304783,"about_ca_topic_score_gemma":0.13219611,"teacher_disagreement_score":0.9271455,"about_ca_system_score_codex":0.000063946085,"about_ca_system_score_gemma":0.000020492058,"threshold_uncertainty_score":0.957026},"labels":[],"label_agreement":null},{"id":"W2328442432","doi":"10.1504/ijpse.2015.075127","title":"CHP within smart micro energy grid: optimum operation with distributed energy resources","year":2015,"lang":"en","type":"article","venue":"International Journal of Process Systems Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Oak Ridge National Laboratory","keywords":"Distributed generation; Smart grid; Grid; Engineering; Investment (military); Cogeneration; Environmental economics; Energy storage; Automotive engineering; Power (physics); Reliability engineering; Renewable energy; Electrical engineering; Electricity generation; Economics","score_opus":0.007629374775117701,"score_gpt":0.19543659336529987,"score_spread":0.18780721859018215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328442432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14683843,0.0022670547,0.8385223,0.00017096466,0.010679955,0.000089568835,0.00003553397,0.00033364765,0.0010625429],"genre_scores_gemma":[0.99672943,0.00004362297,0.0012106575,0.000022041171,0.0017534152,0.000026055732,0.000042369236,0.00006786181,0.00010453683],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807227,0.00002216954,0.0006990254,0.00015682414,0.0008175612,0.00023212912],"domain_scores_gemma":[0.9987457,0.00003013254,0.0002262726,0.00014200695,0.00066107896,0.00019484253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003049295,0.0002607698,0.00030923422,0.00040297717,0.00002526731,0.00023785491,0.0005412865,0.00008004832,0.000005366846],"category_scores_gemma":[0.000047017966,0.00022609574,0.00005816886,0.0002152044,0.000017036216,0.00056199665,0.000043005115,0.00016964955,0.0000025891331],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048851445,0.000021836946,0.00024303557,0.00005522855,0.00041933433,0.00012312569,0.00031298018,0.9950363,0.0010650342,0.0009216548,0.0016533867,0.00009922709],"study_design_scores_gemma":[0.0014637414,0.00015152033,0.00016076649,0.000627717,0.000056153127,0.0009173641,0.00059539423,0.8956234,0.011837807,0.00002181793,0.08806874,0.00047558342],"about_ca_topic_score_codex":0.00009107907,"about_ca_topic_score_gemma":0.000018998651,"teacher_disagreement_score":0.849891,"about_ca_system_score_codex":0.00038294907,"about_ca_system_score_gemma":0.00006485404,"threshold_uncertainty_score":0.92199165},"labels":[],"label_agreement":null},{"id":"W2328706904","doi":"10.3384/ecp110571837","title":"Analysing the Energy Performance of Secondary Schools in N. Greece","year":2011,"lang":"en","type":"article","venue":"Linköping electronic conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Base load power plant; Renewable energy; Automotive engineering; Photovoltaic system; Environmental science; Voltage droop; Wind power; Electricity; Computer science; Electrical engineering; Engineering; Distributed generation; Voltage","score_opus":0.01229811454804204,"score_gpt":0.1773589357970495,"score_spread":0.16506082124900748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328706904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97315973,0.00044350835,0.001577592,0.000059307265,0.00010823112,0.00009639512,4.236091e-7,0.0001709041,0.024383923],"genre_scores_gemma":[0.99887437,0.0005919756,0.00023372,0.000049904098,0.000059063703,0.00004754157,0.0000020158109,0.000029583261,0.00011184799],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864095,0.0000074708064,0.00036533023,0.0002338797,0.00018528143,0.00056708365],"domain_scores_gemma":[0.99959266,0.00001505867,0.00008325151,0.00017589967,0.00009190263,0.000041236206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032536616,0.0002003979,0.00024060221,0.0002332271,0.00005583897,0.000036984715,0.0004710117,0.00007745844,0.00008800905],"category_scores_gemma":[0.000017761397,0.00017491015,0.000054848402,0.00060695165,0.000049902585,0.00032240327,0.00008457031,0.0005460139,0.0000059720956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027812071,0.00025513044,0.13101526,0.001907022,0.0012271978,0.000012677298,0.015318542,0.022755425,0.09037298,0.469755,0.001850459,0.2652522],"study_design_scores_gemma":[0.0008440991,0.00030623397,0.039927084,0.0005545472,0.00010226489,0.000019005172,0.0011953322,0.81466824,0.12963212,0.0051335427,0.006755097,0.00086242624],"about_ca_topic_score_codex":0.00015108153,"about_ca_topic_score_gemma":0.000112848116,"teacher_disagreement_score":0.7919128,"about_ca_system_score_codex":0.00015113753,"about_ca_system_score_gemma":0.00010135518,"threshold_uncertainty_score":0.71326286},"labels":[],"label_agreement":null},{"id":"W2330456757","doi":"10.1109/tpwrs.2014.2327041","title":"Home Appliance Load Modeling From Aggregated Smart Meter Data","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":149,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Smart grid; Metering mode; Home automation; Real-time computing; Hidden Markov model; Computer science; Demand response; Duration (music); Automatic meter reading; Data modeling; Electric power system; Markov chain; Load management; Power (physics); Engineering; Electricity; Telecommunications; Electrical engineering; Database; Wireless; Artificial intelligence","score_opus":0.024750371377631784,"score_gpt":0.2106625876590565,"score_spread":0.1859122162814247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330456757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01536803,0.00031444733,0.9721294,0.00002482526,0.007925135,0.00024003357,0.00014104859,0.00080787484,0.0030492179],"genre_scores_gemma":[0.99847955,0.000046703877,0.0006024408,0.000046163976,0.00007900984,0.000097541706,0.000034095698,0.000088690605,0.000525815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835294,0.000055172317,0.00038500925,0.00048265717,0.00038665987,0.00033757644],"domain_scores_gemma":[0.99818605,0.00006224141,0.00003661849,0.0015562883,0.00004449816,0.00011432401],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026685448,0.000281059,0.00030815098,0.00012418043,0.00008964212,0.00010720958,0.0005726143,0.00011922974,0.000090512076],"category_scores_gemma":[0.0000026154698,0.00028925692,0.00005672822,0.00022729531,0.000018215249,0.00029994376,0.000004644845,0.00023687593,0.00057573325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010817868,0.000027138061,0.0000055071737,0.000038441893,0.00019749267,0.0000030820345,0.00007311476,0.9962757,0.0007882794,0.00001737174,0.0020492831,0.00051377714],"study_design_scores_gemma":[0.00040800724,0.00002398615,0.000011233448,0.000121533434,0.000059896487,0.0000027722895,0.000044035405,0.9674005,0.00085211254,0.000011961739,0.030735394,0.00032856895],"about_ca_topic_score_codex":0.00065746036,"about_ca_topic_score_gemma":0.00014750133,"teacher_disagreement_score":0.9831115,"about_ca_system_score_codex":0.00016665747,"about_ca_system_score_gemma":0.000011969892,"threshold_uncertainty_score":0.99995595},"labels":[],"label_agreement":null},{"id":"W2334743621","doi":"10.1109/intlec.2014.6972115","title":"Dual-purposing telecom backup systems for cloud energy storage and grid ancillary services","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alpha Technologies (Canada)","funders":"","keywords":"Backup; Telecommunications; Computer science; Telecom infrastructure sharing; Grid; Peak demand; Electric power system; Electricity; Electrical engineering; Power (physics); Engineering; Operating system","score_opus":0.005278885505813258,"score_gpt":0.17259850391364512,"score_spread":0.16731961840783185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334743621","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47054043,0.007634772,0.45370424,0.000254164,0.014947007,0.00071352825,0.000031715124,0.0023962557,0.049777877],"genre_scores_gemma":[0.9913087,0.00042849855,0.003123706,0.0003325375,0.0030628832,0.00012109495,0.00005587619,0.000111056084,0.0014556667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910367,0.000020142244,0.0002145415,0.0002233274,0.0001283572,0.00030997445],"domain_scores_gemma":[0.99949837,0.00008178193,0.000028365417,0.00026812134,0.00003130518,0.00009206362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020595433,0.00019459351,0.0002160379,0.00008490823,0.00008062924,0.00011194363,0.000106158215,0.000071427945,0.000011174781],"category_scores_gemma":[0.000004580491,0.00018669837,0.000037124573,0.00009169293,0.000013093788,0.00014548367,0.00006608614,0.00004566254,0.000008404355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001222456,0.000019923264,0.00045664128,0.0013994941,0.00019703982,0.000006560124,0.00012161536,0.90876484,0.001446254,0.030364633,0.052495282,0.0047154804],"study_design_scores_gemma":[0.00026147734,0.000028533312,0.0002441599,0.000034100838,0.000018027158,0.00000633784,0.000062197556,0.5133585,0.0004142,0.000042100026,0.48533532,0.0001950317],"about_ca_topic_score_codex":0.00018045153,"about_ca_topic_score_gemma":0.00013649839,"teacher_disagreement_score":0.5207682,"about_ca_system_score_codex":0.000056128705,"about_ca_system_score_gemma":0.0000032743815,"threshold_uncertainty_score":0.7613339},"labels":[],"label_agreement":null},{"id":"W2338863226","doi":"10.1109/tsg.2015.2472523","title":"Residential Demand Side Management Under High Penetration of Rooftop Photovoltaic Units","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Photovoltaic system; Mathematical optimization; Voltage; Computer science; Automotive engineering; Scheduling (production processes); Peaking power plant; Energy consumption; Electrical engineering; Distributed generation; Engineering; Renewable energy; Mathematics","score_opus":0.02243186696379463,"score_gpt":0.21351094882644012,"score_spread":0.1910790818626455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2338863226","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23798428,0.00007048814,0.7489776,0.000068108886,0.0055233645,0.0003787705,0.00002898749,0.00040481263,0.0065635564],"genre_scores_gemma":[0.99733454,0.00009599833,0.0011089883,0.0000633592,0.00018372019,0.00008859161,0.000021235375,0.000057781253,0.0010457688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985245,0.00005303387,0.00039733035,0.00026463447,0.00046685693,0.000293653],"domain_scores_gemma":[0.99921393,0.00003915873,0.000048711725,0.00044963555,0.000104636594,0.00014394733],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022242076,0.00024491583,0.00022639477,0.00037569096,0.00008046899,0.000038624432,0.00019313612,0.000093825445,0.00009516717],"category_scores_gemma":[0.0000024159062,0.00026999615,0.00007437683,0.000592231,0.000043997738,0.00023742807,0.0000033928604,0.00017633624,0.00011549194],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051564257,0.000069966605,0.000026025573,0.000069114074,0.0002291403,0.000013351336,0.000085307656,0.98896277,0.0027554994,0.00027158193,0.0063970936,0.0010685785],"study_design_scores_gemma":[0.0061029796,0.0006107909,0.013043943,0.00027329358,0.00088855805,0.000030688687,0.0009773022,0.109462515,0.8403936,0.001588283,0.02504274,0.0015853063],"about_ca_topic_score_codex":0.00026185522,"about_ca_topic_score_gemma":0.00065977266,"teacher_disagreement_score":0.87950027,"about_ca_system_score_codex":0.00019081819,"about_ca_system_score_gemma":0.000027303695,"threshold_uncertainty_score":0.9999752},"labels":[],"label_agreement":null},{"id":"W2340152469","doi":"10.1109/tpwrs.2015.2457428","title":"Model Predictive Control of Aggregated Heterogeneous Second-Order Thermostatically Controlled Loads for Ancillary Services","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Model predictive control; Control theory (sociology); Population; Smart grid; Grid; Controller (irrigation); Computer science; Control (management); Control engineering; Mathematical optimization; Engineering; Mathematics","score_opus":0.013223003513252243,"score_gpt":0.21021404129947377,"score_spread":0.1969910377862215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340152469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03073895,0.0005593574,0.96246094,0.000024603924,0.002197779,0.0015637364,0.00040243988,0.00034670523,0.0017055055],"genre_scores_gemma":[0.9983073,0.000014094059,0.00032797322,0.00008438392,0.000021760463,0.0007449602,0.000008143277,0.00008111548,0.00041028476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984506,0.000057966772,0.0005759278,0.00025356558,0.00033192162,0.00033004303],"domain_scores_gemma":[0.9988558,0.0001411396,0.0001032643,0.00038415648,0.0003506199,0.0001649811],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027212195,0.00029183316,0.0005999231,0.00016521978,0.000050499562,0.000037206384,0.00019627492,0.00014388599,0.000020426089],"category_scores_gemma":[0.000004465382,0.00026490047,0.00016933872,0.00016606553,0.00003602081,0.00013646945,0.0000010487815,0.000118159485,0.0000143757625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007950297,0.00009579045,0.0000028887614,0.00020853114,0.00097197463,0.0000042804622,0.0005075491,0.995671,0.001352369,0.000049591945,0.0002878384,0.000053158772],"study_design_scores_gemma":[0.007858271,0.00034954803,0.0000029971668,0.00008800399,0.00017020966,0.000008667564,0.00024371842,0.987268,0.0029644344,0.000027615666,0.0007840516,0.00023453067],"about_ca_topic_score_codex":0.000022184773,"about_ca_topic_score_gemma":0.000052232524,"teacher_disagreement_score":0.96756834,"about_ca_system_score_codex":0.0001446982,"about_ca_system_score_gemma":0.00005256432,"threshold_uncertainty_score":0.99998033},"labels":[],"label_agreement":null},{"id":"W2341859722","doi":"","title":"Load shaping via grid wide coordination of heating-cooling electric loads: A mean field games based approach","year":2015,"lang":"en","type":"article","venue":"Les Cahiers du GERAD","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Distributed generation; Aggregate (composite); Load balancing (electrical power); Smoothing; Computer science; Engineering; Renewable energy; Electrical engineering; Mathematics","score_opus":0.01318602606314883,"score_gpt":0.19504715880688955,"score_spread":0.18186113274374072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341859722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34280518,0.0007201799,0.6476679,0.00018174443,0.00055796804,0.00022107059,0.0000015244834,0.00041225538,0.0074321744],"genre_scores_gemma":[0.98665595,0.00001677983,0.012615853,0.0002586902,0.0002696399,0.00004130262,0.0000198204,0.00004750761,0.00007443915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986804,0.000049334085,0.00032866557,0.00024285473,0.0003680395,0.0003306973],"domain_scores_gemma":[0.9992874,0.00014568468,0.00007487454,0.00027914048,0.00010721747,0.00010568546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004126275,0.00021577161,0.00026416965,0.00024561374,0.00006815689,0.00003660421,0.00020631513,0.00013264587,0.000011914725],"category_scores_gemma":[0.00020737041,0.00023580088,0.00008400656,0.00047807573,0.000034221674,0.00015402232,0.000026992651,0.00024736187,0.0000067340816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005577822,0.00006830013,0.0024431641,0.00029015605,0.00014598086,0.000011957452,0.0019344614,0.9692709,0.0038285686,0.0019479482,0.008693835,0.011308969],"study_design_scores_gemma":[0.0008857178,0.00009609379,0.0005948973,0.000051942618,0.000050071983,0.000005661474,0.00030780502,0.96993583,0.024292149,0.00036043007,0.0030668457,0.00035254328],"about_ca_topic_score_codex":0.00024174903,"about_ca_topic_score_gemma":0.000023102026,"teacher_disagreement_score":0.6438508,"about_ca_system_score_codex":0.00044001962,"about_ca_system_score_gemma":0.000038328297,"threshold_uncertainty_score":0.96156806},"labels":[],"label_agreement":null},{"id":"W2343090960","doi":"10.1109/tsg.2016.2532885","title":"Non-Intrusive Load Monitoring Using Semi-Supervised Machine Learning and Wavelet Design","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wavelet; Computer science; Machine learning; Artificial intelligence; Process (computing); Supervised learning; Semi-supervised learning; Online machine learning; Pattern recognition (psychology); Artificial neural network","score_opus":0.018967747927057393,"score_gpt":0.21955271756707243,"score_spread":0.20058496964001504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343090960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16495752,0.000102389866,0.8311254,0.000067543384,0.0028039145,0.00020478068,0.000013656255,0.0004213759,0.000303425],"genre_scores_gemma":[0.9924845,0.00058107934,0.0059641064,0.000020575257,0.0004012065,0.000055285946,0.000001020154,0.00009947767,0.0003927547],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861854,0.000049903905,0.00027274914,0.0003415137,0.00028788153,0.00042943042],"domain_scores_gemma":[0.9993571,0.00015062222,0.000031519277,0.0002574746,0.000052686588,0.00015057351],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021219932,0.00031921297,0.0002547788,0.00021252283,0.000244363,0.0000528369,0.00012566864,0.00010558739,0.00011880553],"category_scores_gemma":[0.0000064049764,0.0002759716,0.00008385256,0.00023175291,0.00004795977,0.00026436144,0.0000039820948,0.0002801206,0.00007473935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057771438,0.000038174298,0.0006356744,0.00005447211,0.0002158324,0.00002812929,0.00024411264,0.8711547,0.102715895,0.0000026037417,0.00015827596,0.024694327],"study_design_scores_gemma":[0.0018610918,0.00016074911,0.00065119885,0.0003281736,0.00015204758,0.00003915184,0.00009914235,0.5649575,0.42421427,0.000016036951,0.0067535937,0.00076702854],"about_ca_topic_score_codex":0.00007764033,"about_ca_topic_score_gemma":0.000017127217,"teacher_disagreement_score":0.827527,"about_ca_system_score_codex":0.0003398432,"about_ca_system_score_gemma":0.000023804432,"threshold_uncertainty_score":0.99996924},"labels":[],"label_agreement":null},{"id":"W2344925178","doi":"10.3390/app6050122","title":"An Enhanced System Architecture for Optimized Demand Side Management in Smart Grid","year":2016,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; University of Alberta","funders":"","keywords":"Computer science; Smart grid; Knapsack problem; Demand response; Carbon footprint; Scheduling (production processes); Architecture; MATLAB; Grid; Distributed computing; Embedded system; Real-time computing; Electricity; Engineering; Operating system; Greenhouse gas; Algorithm; Operations management","score_opus":0.008204597729595357,"score_gpt":0.2133013636004495,"score_spread":0.20509676587085413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344925178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17808999,0.000051210227,0.74512684,0.00014888136,0.00094450935,0.0009901721,0.0000059403596,0.0005425695,0.07409988],"genre_scores_gemma":[0.9678804,0.00001660223,0.031314652,0.000042933858,0.00011449512,0.00054210343,0.0000022073732,0.000018022554,0.00006856525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99878067,0.000014642476,0.00022001087,0.00036440304,0.00022160527,0.00039869305],"domain_scores_gemma":[0.99956024,0.00007946316,0.0000286387,0.0002576863,0.000007803409,0.000066184606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000524368,0.00016014621,0.00017741419,0.0002068491,0.000094028794,0.000053771702,0.00041834472,0.00003726819,0.000008850625],"category_scores_gemma":[0.0000037528657,0.00011015714,0.00003240862,0.00029871636,0.00008718259,0.00010581798,0.000047720783,0.000036065037,0.000019806956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031544783,0.000017975242,0.000029922938,0.00012425851,0.000034900077,0.0000035840915,0.00013633301,0.9282951,0.024452692,0.024342692,0.0004731065,0.022057902],"study_design_scores_gemma":[0.017779456,0.00061532547,0.010563481,0.0010455339,0.00022275111,0.000014020541,0.0059402375,0.39894477,0.49436387,0.012256178,0.054188833,0.004065569],"about_ca_topic_score_codex":0.0000055112214,"about_ca_topic_score_gemma":0.000054854434,"teacher_disagreement_score":0.7897904,"about_ca_system_score_codex":0.000088433764,"about_ca_system_score_gemma":0.000006397836,"threshold_uncertainty_score":0.44920775},"labels":[],"label_agreement":null},{"id":"W2367823196","doi":"","title":"TOU Power Price Model Based on DSM","year":2007,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Power (physics); Econometrics; Mathematical optimization; Economics; Mathematics","score_opus":0.004694784284641159,"score_gpt":0.19837987013445282,"score_spread":0.19368508584981167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2367823196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00248964,0.000017162158,0.94676757,0.00010402674,0.000037479404,0.00030919965,0.00000546327,0.0005205248,0.049748927],"genre_scores_gemma":[0.6313006,0.000002940855,0.36629617,0.001375596,0.0002182062,0.00029337444,0.00003945033,0.000064744396,0.00040889613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992625,0.0000031377513,0.0001708206,0.00020704059,0.000106664826,0.0002498207],"domain_scores_gemma":[0.99947745,0.00003493722,0.00001643511,0.00037304364,0.000024928608,0.000073189374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010312489,0.0001364053,0.00008371636,0.00013693639,0.000060432132,0.000028320948,0.00023718395,0.00004873347,0.000026393302],"category_scores_gemma":[1.4849097e-7,0.00015043972,0.000046465022,0.00023723199,0.000013020165,0.000039379574,0.00003971425,0.00009871951,0.00021177428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017126756,0.000054615637,0.000014377524,0.000012022678,0.000013006596,9.0805446e-7,0.000038045815,0.96531355,0.0022988482,0.003537667,0.013926984,0.014788277],"study_design_scores_gemma":[0.0001555291,0.0000059747567,0.00065650453,0.000004504836,0.0000043612445,6.345989e-7,0.0000027227347,0.5135502,0.0029903855,0.00011958439,0.4823754,0.00013415708],"about_ca_topic_score_codex":0.0000019066762,"about_ca_topic_score_gemma":0.0000024426238,"teacher_disagreement_score":0.62881094,"about_ca_system_score_codex":0.00010180851,"about_ca_system_score_gemma":0.0000071697136,"threshold_uncertainty_score":0.6134754},"labels":[],"label_agreement":null},{"id":"W2368505321","doi":"10.1049/iet-rpg.2015.0282","title":"Global energy management system for cooperative networked residential green buildings","year":2016,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Controller (irrigation); Grid; Control (management); Wind power; Energy management; Building management system; Electric power system; Computer science; Power (physics); Engineering; Energy (signal processing); Electrical engineering","score_opus":0.00862517437838843,"score_gpt":0.2025003527020534,"score_spread":0.193875178323665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368505321","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009793583,0.00027897247,0.97475946,0.0001988422,0.003684504,0.00038027499,0.00004401938,0.00058577565,0.010274585],"genre_scores_gemma":[0.98377985,0.00014026831,0.006289111,0.00010896829,0.0015476673,0.000500555,0.00012036003,0.0000721808,0.007441044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984665,0.000043487224,0.00036965348,0.0004100361,0.00026991699,0.00044041913],"domain_scores_gemma":[0.9993294,0.00002037526,0.00005845765,0.0003828092,0.00011139061,0.0000975945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017289161,0.0002742424,0.00021869017,0.00009810108,0.00015255564,0.000115991475,0.00022218988,0.00010604837,0.000052956206],"category_scores_gemma":[0.0000055026567,0.0002293689,0.00008033026,0.00026020815,0.00002431586,0.0002837099,0.00007868612,0.000020056288,0.000021955955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036688463,0.0000136691015,0.00004674987,0.000047666355,0.00024444,0.00000877458,0.00002092553,0.7822765,0.0102668945,0.027424062,0.17573772,0.0038758959],"study_design_scores_gemma":[0.002647838,0.00016693906,0.00023848847,0.00016813242,0.00016311051,0.000010633026,0.00008233768,0.21144319,0.047341365,0.00035060817,0.73653203,0.00085530564],"about_ca_topic_score_codex":0.00044895374,"about_ca_topic_score_gemma":0.0014593482,"teacher_disagreement_score":0.97398627,"about_ca_system_score_codex":0.000477244,"about_ca_system_score_gemma":0.000015543063,"threshold_uncertainty_score":0.9353392},"labels":[],"label_agreement":null},{"id":"W2388796209","doi":"10.1109/tpds.2015.2470238","title":"A Distributed and Scalable Approach to Semi-Intrusive Load Monitoring","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Parallel and Distributed Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Science and Technology Commission of Shanghai Municipality; Natural Sciences and Engineering Research Council of Canada; Shanghai Municipal Education Commission; National Natural Science Foundation of China","keywords":"Computer science; Scalability; Metering mode; Distributed computing; Energy consumption; Energy (signal processing); Real-time computing; TRACE (psycholinguistics); Load management; Constraint (computer-aided design); Scale (ratio); Power (physics); Database","score_opus":0.022911886239072584,"score_gpt":0.21629878302235891,"score_spread":0.19338689678328633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2388796209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047073096,0.00054378354,0.9486354,0.000047799807,0.0012168955,0.00040999294,0.00043912441,0.0004092219,0.0012246921],"genre_scores_gemma":[0.99870646,0.000086494685,0.00045949174,0.000009780558,0.00012347354,0.00029662007,0.000058054207,0.0000336682,0.00022598558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860185,0.000041818155,0.00030294675,0.00035092724,0.0003145641,0.00038788986],"domain_scores_gemma":[0.99908984,0.000038149316,0.000029282597,0.00028545994,0.00009584191,0.00046143885],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018704678,0.00028740737,0.00032477756,0.00010281045,0.00013900077,0.0001567222,0.00011591552,0.00012252787,0.0000020492002],"category_scores_gemma":[0.000007561914,0.0002821434,0.000042944386,0.0003667452,0.000036681726,0.00015829835,0.000004686552,0.00018066751,0.000029763833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041941403,0.00006116054,0.00014362222,0.000099367455,0.00011703067,0.0000063432863,0.00019121818,0.9950584,0.00012658445,0.0000707566,0.0038191252,0.00026443668],"study_design_scores_gemma":[0.002771754,0.00021222705,0.0012824496,0.00021916885,0.0001729992,0.00009936415,0.0033255108,0.9606867,0.00083380734,0.000044504144,0.029329555,0.0010219986],"about_ca_topic_score_codex":0.00023859472,"about_ca_topic_score_gemma":0.000009056943,"teacher_disagreement_score":0.95163333,"about_ca_system_score_codex":0.00030394137,"about_ca_system_score_gemma":0.000023473602,"threshold_uncertainty_score":0.99996305},"labels":[],"label_agreement":null},{"id":"W2395510365","doi":"10.3233/978-1-60750-583-9-40","title":"Hitting the ground running: Healthgrid deployment and adoption","year":2010,"lang":"en","type":"article","venue":"Studies in health technology and informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lawson Health Research Institute","funders":"","keywords":"Software deployment; Computer science; Computer security; Business; Operating system","score_opus":0.023997700786318212,"score_gpt":0.2900542515772631,"score_spread":0.2660565507909449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2395510365","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98573124,0.0057311268,0.00057007483,0.005215005,0.0012005286,0.0003292321,7.768156e-7,0.0003743043,0.000847684],"genre_scores_gemma":[0.9829538,0.011936251,0.004373689,0.0005974622,0.000047180485,0.00007163027,0.0000010320676,0.000009905606,0.000009058563],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991203,0.0000075748653,0.00045560737,0.00006273842,0.00006915124,0.0002846257],"domain_scores_gemma":[0.9996399,0.000063251115,0.000075936994,0.00017416108,0.000017293174,0.000029439881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006114839,0.00011167963,0.00017784735,0.00023201073,0.00026422032,0.000011708515,0.000089026136,0.00008819369,7.9235355e-7],"category_scores_gemma":[0.000060557515,0.000084724794,0.000007256909,0.00026825682,0.0002576339,0.00011301596,0.00017005055,0.00047107466,0.000001760217],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019787094,0.000054706597,0.11650909,0.0084837815,0.00033039562,0.0000069804587,0.03687277,0.017634835,0.000028097462,0.41715318,0.008801246,0.39410514],"study_design_scores_gemma":[0.002637369,0.0007563173,0.119782336,0.00095029466,0.00004627206,0.00023217472,0.14365086,0.22010285,0.00020579231,0.020345267,0.4902049,0.001085585],"about_ca_topic_score_codex":0.000013329606,"about_ca_topic_score_gemma":0.00012460511,"teacher_disagreement_score":0.48140365,"about_ca_system_score_codex":0.000060017846,"about_ca_system_score_gemma":0.000009969097,"threshold_uncertainty_score":0.3454977},"labels":[],"label_agreement":null},{"id":"W2395647033","doi":"10.1109/waina.2016.160","title":"Cost and Load Reduction Using Heuristic Algorithms in Smart Grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Smart grid; Particle swarm optimization; Demand response; Genetic algorithm; Mathematical optimization; Reduction (mathematics); Heuristics; Heuristic; Energy consumption; Schedule; Electricity; Scheduling (production processes); Algorithm; Engineering; Artificial intelligence; Mathematics","score_opus":0.024116383187731537,"score_gpt":0.2291826787525061,"score_spread":0.20506629556477457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2395647033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80296284,0.0002735422,0.17880718,0.0002876094,0.003605276,0.0002790072,0.0000041845997,0.00050206925,0.01327826],"genre_scores_gemma":[0.99473995,0.00015334482,0.0041291947,0.000015603648,0.00028228606,0.000014224567,0.0000012319965,0.000024919584,0.00063923805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995056,0.000008477412,0.00011605792,0.00012342709,0.00008520595,0.00016127786],"domain_scores_gemma":[0.9998126,0.000014577898,0.000007817477,0.00011517825,0.000011353175,0.00003845031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009919192,0.000081976046,0.000076968,0.00007648532,0.000015855903,0.000014251886,0.000036740894,0.000028437897,0.00006120675],"category_scores_gemma":[0.000012668299,0.000063849024,0.000010234567,0.00009672654,0.000019256358,0.00011500208,0.000028542432,0.000033480457,0.000024759798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004545645,0.00012242392,0.01869317,0.000271643,0.00021188275,0.00012169755,0.00055322435,0.4794985,0.08243244,0.0033764495,0.037036072,0.37763703],"study_design_scores_gemma":[0.0033171987,0.00007263664,0.068915255,0.0003652476,0.000060791823,0.00013450332,0.00027973056,0.77520823,0.025226792,0.00076877465,0.12440455,0.0012463123],"about_ca_topic_score_codex":0.00013520976,"about_ca_topic_score_gemma":0.000053580545,"teacher_disagreement_score":0.37639073,"about_ca_system_score_codex":0.00020084846,"about_ca_system_score_gemma":0.000005433453,"threshold_uncertainty_score":0.26036876},"labels":[],"label_agreement":null},{"id":"W2396312483","doi":"10.1109/tste.2016.2569425","title":"Practical Strategies for Storage Operation in Energy Systems: Design and Evaluation","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Tariff; Energy storage; Context (archaeology); Grid; Payment; Distributed generation; Electricity generation; Demand response; Photovoltaic system; Mathematical optimization; Reliability engineering; Operations research; Renewable energy; Electricity; Power (physics); Engineering; Electrical engineering; Economics","score_opus":0.024835496476767863,"score_gpt":0.2604470144705332,"score_spread":0.23561151799376534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2396312483","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018318328,0.00017246052,0.9961432,0.00018134476,0.0005290584,0.00034160833,0.0000034140958,0.00017136728,0.0006257003],"genre_scores_gemma":[0.99476707,0.00030115727,0.0014040516,0.000029898698,0.000075154494,0.0016593833,0.0000035042203,0.00004985266,0.001709938],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869025,0.00014569535,0.00026693527,0.00027980702,0.00023952937,0.0003777624],"domain_scores_gemma":[0.9992553,0.0002871884,0.000028875473,0.00021879988,0.00014101723,0.00006884254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054966746,0.0001975207,0.00017539866,0.00035190434,0.0001164157,0.00012761037,0.000067789966,0.000115988005,0.000033116074],"category_scores_gemma":[0.000011881205,0.00017043234,0.00003472726,0.00020414428,0.000030661256,0.0008023728,0.0000013902962,0.00005779682,0.0000017620148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005998558,0.00004501842,2.9841715e-7,0.000055788612,0.00004393901,0.000010822553,0.00004912083,0.9520663,0.0007429182,0.039932445,0.000967948,0.006025408],"study_design_scores_gemma":[0.0011983641,0.00015932327,0.000007765563,0.000039995048,0.000049863884,0.0000069495422,0.0015505903,0.9727034,0.0067725373,0.0013702702,0.015881667,0.00025924738],"about_ca_topic_score_codex":0.000308868,"about_ca_topic_score_gemma":0.00013391228,"teacher_disagreement_score":0.9947392,"about_ca_system_score_codex":0.00063299324,"about_ca_system_score_gemma":0.0001400244,"threshold_uncertainty_score":0.6950029},"labels":[],"label_agreement":null},{"id":"W2401914074","doi":"10.1109/icassp.2016.7472319","title":"Real-time joint energy storage management and load scheduling with renewable integration","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Lyapunov optimization; Renewable energy; Dynamic priority scheduling; Scheduling (production processes); Energy storage; Mathematical optimization; Time horizon; Fair-share scheduling; Load management; Distributed computing; Real-time computing; Engineering; Quality of service; Computer network","score_opus":0.006267355766651816,"score_gpt":0.16756777599588082,"score_spread":0.161300420229229,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2401914074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063389786,0.00007846418,0.6733506,0.0002079782,0.00019209446,0.000120673154,0.000001176712,0.00082383415,0.26183543],"genre_scores_gemma":[0.9120407,0.0010810421,0.04592029,0.000058355618,0.00012493956,0.00007163799,0.00000629385,0.00007076214,0.04062595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919814,0.00001196564,0.00015503401,0.00022033301,0.00019190142,0.00022260488],"domain_scores_gemma":[0.99959767,0.000014387776,0.000020474155,0.00027110448,0.000027110682,0.00006928085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012233095,0.0001653002,0.00013141734,0.00010812973,0.000038835376,0.000041558873,0.000071226415,0.00003544753,0.00017595544],"category_scores_gemma":[0.0000033809577,0.000104768136,0.000018550327,0.000119881595,0.000022899212,0.00019522606,0.000062219864,0.000025020487,0.00004069501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006068509,0.00005433408,0.00017671043,0.00014411293,0.0005197474,0.00009193734,0.00014352419,0.73593533,0.12739088,0.052237716,0.027233671,0.05601136],"study_design_scores_gemma":[0.004885698,0.00042086595,0.0063332245,0.0011572151,0.0002489384,0.000033047323,0.00055156177,0.64248604,0.21217245,0.00232132,0.12716801,0.0022216474],"about_ca_topic_score_codex":0.0002850047,"about_ca_topic_score_gemma":0.00020906955,"teacher_disagreement_score":0.84865093,"about_ca_system_score_codex":0.00020250454,"about_ca_system_score_gemma":0.000005796466,"threshold_uncertainty_score":0.42723206},"labels":[],"label_agreement":null},{"id":"W2425286272","doi":"10.1109/tsg.2015.2435708","title":"Load Scheduling and Power Trading in Systems With High Penetration of Renewable Energy Resources","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":215,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Revenue; Electric power system; Scheduling (production processes); Computer science; Electricity generation; Schedule; Distributed generation; Grid; Environmental economics; Mathematical optimization; Business; Power (physics); Economics; Engineering; Electrical engineering; Finance","score_opus":0.012119778333591253,"score_gpt":0.18698987890347973,"score_spread":0.17487010056988847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2425286272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65615195,0.00031280454,0.3384218,0.00003069622,0.0014930214,0.00012207961,0.00001145345,0.0001630997,0.0032930886],"genre_scores_gemma":[0.99886674,0.000052494488,0.00072943023,0.000011660255,0.00007034188,0.00004729853,0.0000025175857,0.000035863082,0.00018365517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990015,0.00003614441,0.00027140346,0.00020105173,0.0002878988,0.00020200823],"domain_scores_gemma":[0.99957436,0.00004059383,0.00003717585,0.00020936021,0.0000471993,0.00009133724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022015553,0.00016711383,0.00021571289,0.00026191951,0.000041206367,0.00003898956,0.00008075389,0.000072063005,0.000010940028],"category_scores_gemma":[0.0000022667016,0.00016246199,0.000024671397,0.00032753518,0.0000338597,0.00020456263,9.568657e-7,0.00011152294,0.0000016621657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052799278,0.00003504672,0.00017799984,0.00004090032,0.000049461472,0.0000059821136,0.00035604686,0.99776834,0.0010814011,0.00004902761,0.00023905245,0.00014391437],"study_design_scores_gemma":[0.0038872275,0.000797878,0.0020284005,0.0006793705,0.00013465686,0.000051463223,0.002123798,0.8936191,0.081104934,0.00007580668,0.014545877,0.000951487],"about_ca_topic_score_codex":0.0032560667,"about_ca_topic_score_gemma":0.0022882323,"teacher_disagreement_score":0.3427148,"about_ca_system_score_codex":0.00017066427,"about_ca_system_score_gemma":0.00002636939,"threshold_uncertainty_score":0.66250074},"labels":[],"label_agreement":null},{"id":"W2433974433","doi":"10.1145/2939940.2939945","title":"A multi-agent system of evaluating residential demand response","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"SaskPower","keywords":"Demand response; Computer science; Scheduling (production processes); Electric power system; Load management; Energy management system; Dynamic demand; Energy management; Electricity; Peak demand; Multi-agent system; Electricity market; Reliability engineering; Operations research; Power (physics); Engineering; Energy (signal processing); Operations management","score_opus":0.025373856870385764,"score_gpt":0.25948690498918053,"score_spread":0.23411304811879477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2433974433","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7790157,0.00007117941,0.2181388,0.0000448138,0.0005502384,0.00012773756,0.000002000903,0.00033564883,0.0017138653],"genre_scores_gemma":[0.9906471,0.000006260989,0.007567215,0.000004996415,0.00006117246,0.000023225348,2.9820498e-7,0.000023155917,0.0016666069],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991434,0.000092174574,0.00026114512,0.00012324282,0.0002136974,0.0001663117],"domain_scores_gemma":[0.999496,0.00012347392,0.000029118337,0.00027381937,0.00003454694,0.000043036664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007961728,0.00009309946,0.00012321454,0.000102098886,0.000021313623,0.000008939306,0.00011568278,0.000032726886,0.00010048438],"category_scores_gemma":[0.00009660718,0.00006483034,0.000044400294,0.00008417682,0.000014945414,0.000066515335,0.000059576098,0.0000220228,0.00009527288],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023585155,0.0000229944,0.0010984145,0.0002838042,0.00018703265,0.000022189563,0.00019619612,0.21870735,0.77116007,0.0008538039,0.0048011676,0.0024311426],"study_design_scores_gemma":[0.0037177724,0.00016697404,0.0701675,0.000664538,0.00010523672,0.000012135151,0.00044764564,0.6088701,0.31280455,0.000013578263,0.002540259,0.0004897607],"about_ca_topic_score_codex":0.000020248859,"about_ca_topic_score_gemma":0.000017692248,"teacher_disagreement_score":0.45835552,"about_ca_system_score_codex":0.0001252485,"about_ca_system_score_gemma":0.000009285517,"threshold_uncertainty_score":0.26437047},"labels":[],"label_agreement":null},{"id":"W243407427","doi":"","title":"Interruptible Load Management: Literature and Practice","year":2001,"lang":"en","type":"article","venue":"Chalmers Research (Chalmers University of Technology)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic shortage; Electricity; Load management; Computer science; Electricity market; Load balancing (electrical power); Operations research; Electric power system; Industrial organization; Environmental economics; Business; Engineering; Economics; Electrical engineering; Power (physics); Geography","score_opus":0.025992754811524087,"score_gpt":0.27287786299397504,"score_spread":0.24688510818245096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W243407427","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19803642,0.009778945,0.0046342746,0.008964412,0.000478892,0.0008870989,0.000016063743,0.0014309668,0.7757729],"genre_scores_gemma":[0.94712585,0.03769499,0.007550991,0.000029243187,0.000038804,0.0000037171135,0.000010809075,0.00004999861,0.0074956017],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983219,0.00007010531,0.00013730623,0.00039639306,0.0004918174,0.0005824992],"domain_scores_gemma":[0.9989312,0.000080664984,0.000040039704,0.0005563257,0.00026653567,0.00012518512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071798643,0.00019219804,0.00022487089,0.0016625809,0.00019714503,0.000029433111,0.0006555198,0.0002531382,0.000098990306],"category_scores_gemma":[0.000100891855,0.00023479393,0.000057264766,0.0022045975,0.0006778885,0.0004160286,0.00065458374,0.00064108963,0.000058868976],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020738388,0.0012083878,0.003930814,0.004346638,0.006428538,0.022359367,0.015879272,0.015938083,0.017810104,0.15377451,0.18007068,0.57617974],"study_design_scores_gemma":[0.0014381013,0.0002568114,0.0004080073,0.00038872045,0.000078304096,0.00027878172,0.024662782,0.003700086,0.0008783541,0.0013335069,0.9661324,0.0004441224],"about_ca_topic_score_codex":0.000045708228,"about_ca_topic_score_gemma":0.000020477613,"teacher_disagreement_score":0.78606176,"about_ca_system_score_codex":0.00029875804,"about_ca_system_score_gemma":0.000017395987,"threshold_uncertainty_score":0.95746183},"labels":[],"label_agreement":null},{"id":"W2438794591","doi":"10.1145/2939912.2939914","title":"A framework for occupancy-aided energy disaggregation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Occupancy; Energy (signal processing); Computer science; Overhead (engineering); Energy consumption; Interval (graph theory); Energy demand; Metering mode; Simple (philosophy); Real-time computing; Statistics; Environmental economics; Engineering; Mathematics; Architectural engineering; Electrical engineering","score_opus":0.01315349359062483,"score_gpt":0.22307314218560748,"score_spread":0.20991964859498263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2438794591","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004098216,0.000052591888,0.9850511,0.00036920517,0.0007522129,0.000066380046,0.0000032954242,0.00052995665,0.009077067],"genre_scores_gemma":[0.9671262,0.000069587804,0.029346555,0.00017176906,0.00037745372,0.00017009053,0.000004982838,0.00003822816,0.0026951218],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995013,0.000004493563,0.000115138435,0.00011812206,0.000075848475,0.00018512981],"domain_scores_gemma":[0.99959505,0.00012140316,0.000012074213,0.0002154598,0.000015394826,0.00004064105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042120144,0.00009370041,0.0000795793,0.00004805887,0.000022569571,0.000014161237,0.000090643625,0.000052943164,0.00017441127],"category_scores_gemma":[0.000043826545,0.00006398731,0.00004458333,0.0000780675,0.000010139496,0.00010191568,0.000018131675,0.000016169042,0.00004205059],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011319019,0.000011713519,0.00053131406,0.000024427189,0.00007102318,8.211046e-7,0.000021436008,0.0042958646,0.001338193,0.87576187,0.0354071,0.082524925],"study_design_scores_gemma":[0.0011275364,0.00006989014,0.0036240655,0.00019261487,0.000038514987,0.0000014303068,0.000027066617,0.040747166,0.058684457,0.17485356,0.71997863,0.00065506354],"about_ca_topic_score_codex":0.0000073206866,"about_ca_topic_score_gemma":0.000024096893,"teacher_disagreement_score":0.963028,"about_ca_system_score_codex":0.000055431625,"about_ca_system_score_gemma":0.0000028056545,"threshold_uncertainty_score":0.26093265},"labels":[],"label_agreement":null},{"id":"W2465358378","doi":"10.1109/tsg.2016.2584581","title":"Toward Non-Intrusive Load Monitoring via Multi-Label Classification","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":306,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart grid; Key (lock); Multi-label classification; Bespoke; Demand response; Wavelet; Machine learning; Domain (mathematical analysis); Class (philosophy); Artificial intelligence; Data mining; Electricity; Engineering; Computer security","score_opus":0.03955868261262701,"score_gpt":0.24530920191768202,"score_spread":0.205750519305055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2465358378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039369475,0.00003151351,0.94837314,0.00028729884,0.009910717,0.0002552518,0.000027063032,0.0007029566,0.0010425661],"genre_scores_gemma":[0.9932851,0.00027283668,0.0045675426,0.00003502042,0.00057595596,0.00025052624,0.000002045374,0.000085527914,0.0009254236],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985147,0.000025800013,0.00033088296,0.00036654985,0.000348528,0.00041350667],"domain_scores_gemma":[0.99913466,0.00007870979,0.000041090298,0.0005059493,0.00009243145,0.00014714454],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00013089529,0.00029883755,0.00021306671,0.00020652465,0.00013735169,0.00003803852,0.00023564718,0.00013038705,0.000113160895],"category_scores_gemma":[0.0000046109226,0.00025749078,0.00010869868,0.00027628877,0.000049902726,0.00031246772,0.000002300409,0.00020691553,0.0010094285],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011649967,0.00057878305,0.0005798327,0.00015528554,0.0006504172,0.0000382681,0.0007586203,0.22435379,0.36919945,0.000048814254,0.0046759723,0.39884427],"study_design_scores_gemma":[0.0042252922,0.0002020107,0.010645152,0.00031212773,0.00019115058,0.000019724124,0.00018456634,0.28212494,0.6798342,0.00003727644,0.02094453,0.0012790341],"about_ca_topic_score_codex":0.00004952637,"about_ca_topic_score_gemma":0.00003803759,"teacher_disagreement_score":0.95391566,"about_ca_system_score_codex":0.0006122785,"about_ca_system_score_gemma":0.000024638168,"threshold_uncertainty_score":0.9999877},"labels":[],"label_agreement":null},{"id":"W2465806284","doi":"10.1109/tsg.2016.2590147","title":"Water-Filling Exact Solutions for Load Balancing of Smart Power Grid Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Load balancing (electrical power); Mathematical optimization; Load management; Computer science; Smart grid; Load regulation; Grid; Dynamic demand; Power (physics); Electric power system; Optimization problem; Distributed computing; Mathematics; Engineering","score_opus":0.01497289901180364,"score_gpt":0.20415390071576944,"score_spread":0.1891810017039658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2465806284","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046191268,0.00010734369,0.934307,0.00021999952,0.01649692,0.0005591813,0.00029994303,0.00059462775,0.0012237686],"genre_scores_gemma":[0.9975966,0.000118806885,0.00040960722,0.00002777856,0.000426041,0.0003528884,0.000008712408,0.000104094164,0.0009554719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9978387,0.000041581523,0.0005957207,0.00036929658,0.00037632242,0.00077841466],"domain_scores_gemma":[0.99885917,0.00020600406,0.000055248587,0.00058867206,0.00014674659,0.00014417716],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048604817,0.00034069704,0.00039871453,0.00029109663,0.00024351895,0.000038289567,0.00024472515,0.0001405658,0.00014493895],"category_scores_gemma":[0.000008191854,0.0002529928,0.0002743144,0.00019625932,0.000052768282,0.00028654528,0.0000040807395,0.00015593723,0.00016261138],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007924348,0.00012856867,0.000041995765,0.00023464592,0.00041128483,0.000004571648,0.00018478006,0.9158549,0.07254872,0.00014354152,0.00879096,0.0015768035],"study_design_scores_gemma":[0.0038232175,0.00066224457,0.00036701548,0.0010000229,0.0004153911,0.000040609928,0.00028136725,0.08702079,0.62571144,0.00006739788,0.27903023,0.0015802314],"about_ca_topic_score_codex":0.00012279097,"about_ca_topic_score_gemma":0.00012536252,"teacher_disagreement_score":0.95140535,"about_ca_system_score_codex":0.0005183651,"about_ca_system_score_gemma":0.000032479842,"threshold_uncertainty_score":0.99999225},"labels":[],"label_agreement":null},{"id":"W2467667935","doi":"10.3390/en9070542","title":"Real Time Information Based Energy Management Using Customer Preferences and Dynamic Pricing in Smart Homes","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Thermostat; Demand response; Schedule; Electricity; Computer science; Energy management; Optimization problem; Home automation; Real-time computing; Automotive engineering; Engineering; Energy (signal processing); Algorithm; Telecommunications; Electrical engineering","score_opus":0.0044533730095101046,"score_gpt":0.18156891882136658,"score_spread":0.17711554581185648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2467667935","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9758355,0.00008006633,0.0059892926,0.00004043364,0.0002570382,0.000069396454,0.0000029991752,0.00031055443,0.017414726],"genre_scores_gemma":[0.9963286,0.0005834864,0.0026488118,0.000021804866,0.000020725656,0.000030091747,0.000010839431,0.000018409579,0.0003372535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992447,0.00002097762,0.00022098311,0.00012452877,0.00015597403,0.00023287123],"domain_scores_gemma":[0.99971616,0.00003988102,0.00003296516,0.00016550248,0.000012321004,0.000033181987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010363068,0.00015502879,0.00013866121,0.00039902455,0.00003485387,0.000046884652,0.000101184494,0.000044556225,0.000036391823],"category_scores_gemma":[0.0000043464306,0.00012216835,0.000020211413,0.00019047533,0.000030389487,0.000546944,0.00007303202,0.000028427172,0.000018784374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011055812,0.000009469292,0.0015746338,0.000106166415,0.000055718534,0.0000056382273,0.00011882724,0.93572336,0.0028476745,0.0028156422,0.00037694443,0.056354843],"study_design_scores_gemma":[0.0014483862,0.00003616606,0.072659045,0.00045302344,0.000051716834,0.0000024140093,0.00024239735,0.88295174,0.0062221806,0.0003538145,0.03483502,0.00074408116],"about_ca_topic_score_codex":0.00017449046,"about_ca_topic_score_gemma":0.00009254232,"teacher_disagreement_score":0.07108441,"about_ca_system_score_codex":0.00015703353,"about_ca_system_score_gemma":0.0000068290465,"threshold_uncertainty_score":0.49818805},"labels":[],"label_agreement":null},{"id":"W2479551579","doi":"10.1155/2016/3161060","title":"Power Consumption: Base Stations of Telecommunication in Sahel Zone of Cameroon: Typology Based on the Power Consumption—Model and Energy Savings","year":2016,"lang":"en","type":"article","venue":"Journal of Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Base station; Energy consumption; Telecommunications; Power consumption; Consumption (sociology); Power (physics); Work (physics); Engineering; Air conditioning; Base (topology); Efficient energy use; Electrical engineering; Energy (signal processing); Audit; Environmental science; Business; Mechanical engineering","score_opus":0.016176147558412117,"score_gpt":0.22503709844366282,"score_spread":0.2088609508852507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2479551579","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8904675,0.0009390379,0.10344746,0.0019176481,0.0003405191,0.00004426919,0.000021441681,0.00002261085,0.0027994618],"genre_scores_gemma":[0.99684525,0.0012532583,0.0015116498,0.00022522651,0.000018490187,0.0000075193,0.0000023449375,0.000020167796,0.00011608358],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988726,0.00011576572,0.00057524355,0.00009060112,0.00020012005,0.0001456768],"domain_scores_gemma":[0.9986803,0.00050308753,0.00028273748,0.0003422191,0.00013824202,0.000053421023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035395092,0.00012808846,0.00025200297,0.00034293407,0.000028845589,0.0000069007187,0.0002066558,0.00007180162,0.00026943546],"category_scores_gemma":[0.00007811514,0.00008793059,0.000063304506,0.00012573623,0.00015293423,0.00012236288,0.000040229115,0.00010167542,0.0000013621551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018669225,0.00023766098,0.0069629196,0.000042956595,0.00018769412,0.0000099972085,0.00019248488,0.85987055,0.03296285,0.09272353,0.00411279,0.0025098529],"study_design_scores_gemma":[0.017641202,0.0025213177,0.3492534,0.0030513196,0.0004559185,0.00020473162,0.00094715017,0.45809096,0.08836017,0.0064125876,0.071036026,0.0020252315],"about_ca_topic_score_codex":0.000040833034,"about_ca_topic_score_gemma":0.00019261919,"teacher_disagreement_score":0.4017796,"about_ca_system_score_codex":0.00009225683,"about_ca_system_score_gemma":0.0000409032,"threshold_uncertainty_score":0.35857052},"labels":[],"label_agreement":null},{"id":"W2498473652","doi":"10.1109/tdc.2016.7519876","title":"Optimal electricity pricing in a microgrid network","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Microgrid; Mathematical optimization; Electricity; Marginal cost; Computer science; Grid; Electricity market; Boundary (topology); Electricity pricing; Distributed generation; Electricity generation; Economics; Power (physics); Renewable energy; Mathematics; Microeconomics; Engineering","score_opus":0.004624741883147336,"score_gpt":0.17261202712782409,"score_spread":0.16798728524467674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2498473652","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.793855,0.00031796756,0.17212734,0.00018875876,0.0005288828,0.0001323617,3.302274e-7,0.0006510035,0.03219835],"genre_scores_gemma":[0.9924298,0.00012092082,0.0065899594,0.00006953,0.00023894447,0.000017064302,4.621795e-7,0.000022222775,0.0005111115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993472,0.000008823369,0.00013025271,0.000113646485,0.00006636815,0.0003336807],"domain_scores_gemma":[0.99978405,0.000036163474,0.0000073193723,0.0001348612,0.0000058709516,0.000031734377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011466163,0.00008941103,0.000091486654,0.00007105339,0.00001277418,0.000010572988,0.00009603416,0.000030496016,0.00010650464],"category_scores_gemma":[0.0000073651886,0.000064445805,0.000022790484,0.00026663547,0.0000067123287,0.000071614006,0.00003584307,0.000047802332,0.0000828133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004723175,0.000010599585,0.0091898395,0.000008809667,0.00002439913,0.0000120800505,0.000016660268,0.9483956,0.0048135035,0.0012056548,0.019764652,0.016553443],"study_design_scores_gemma":[0.0027816761,0.00013083083,0.14709637,0.00024028993,0.000030929074,0.000016989277,0.000031422172,0.43535873,0.06640306,0.00047251425,0.34597915,0.0014580293],"about_ca_topic_score_codex":0.000022898923,"about_ca_topic_score_gemma":0.000060726557,"teacher_disagreement_score":0.5130369,"about_ca_system_score_codex":0.000115628536,"about_ca_system_score_gemma":0.0000034829575,"threshold_uncertainty_score":0.26280236},"labels":[],"label_agreement":null},{"id":"W2502311290","doi":"10.3390/en9080593","title":"Energy Optimization in Smart Homes Using Customer Preference and Dynamic Pricing","year":2016,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Schedule; Computer science; Electricity; Mathematical optimization; Energy consumption; Dynamic pricing; Optimization problem; Energy (signal processing); Control (management); Preference; Operations research; Simulation; Real-time computing; Engineering; Economics; Artificial intelligence; Microeconomics; Mathematics; Algorithm; Electrical engineering","score_opus":0.010393398924438954,"score_gpt":0.19309263126187567,"score_spread":0.18269923233743673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2502311290","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86321265,0.0006391532,0.13233466,0.000040197676,0.00039647563,0.00003928642,0.0000013849948,0.0002613569,0.0030748341],"genre_scores_gemma":[0.9938101,0.0010613836,0.004678693,0.000014374125,0.00003075341,0.0000145892955,0.0000025847091,0.000029254157,0.0003582779],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993869,0.000017374032,0.00014564837,0.00015821272,0.000092097835,0.00019976993],"domain_scores_gemma":[0.99975777,0.00003753403,0.000019172865,0.00014467513,0.000011928482,0.000028919325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005739996,0.00012678948,0.00011998707,0.00021204892,0.000027233371,0.000025500492,0.00007543224,0.000044408665,0.00002539992],"category_scores_gemma":[0.000009317132,0.00010167082,0.0000138917185,0.00017322316,0.000028770422,0.00024003194,0.00006351274,0.000029292336,0.0000024361566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021542135,0.0000037533848,0.0012041982,0.000015892434,0.000013116903,0.0000025919107,0.00005077013,0.9853686,0.0032875214,0.0009528366,0.000050529532,0.009048001],"study_design_scores_gemma":[0.0003537938,0.0000084906,0.0059762835,0.00013448668,0.000010926756,0.0000028246116,0.000059608716,0.98481363,0.0044916747,0.0001026008,0.0037790956,0.00026658017],"about_ca_topic_score_codex":0.000096695265,"about_ca_topic_score_gemma":0.00014223154,"teacher_disagreement_score":0.13059744,"about_ca_system_score_codex":0.00011581277,"about_ca_system_score_gemma":0.000006290236,"threshold_uncertainty_score":0.41460156},"labels":[],"label_agreement":null},{"id":"W2503331769","doi":"10.1007/978-3-319-29446-9_4","title":"Conventional Energy and Power System","year":2016,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Power Generation","funders":"","keywords":"Electricity; Secondary sector of the economy; Economic shortage; Electric power; Agricultural economics; Power (physics); Natural resource economics; Business; Engineering; Operations management; Economics; Economy; Electrical engineering","score_opus":0.005508203684535036,"score_gpt":0.15296605366532526,"score_spread":0.14745784998079023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2503331769","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002395613,0.00054846046,0.014723726,0.00002465034,0.0011305755,0.0000363191,0.000012168397,0.00043475616,0.98308694],"genre_scores_gemma":[0.01580529,0.0001604613,0.00010904267,0.000039535804,0.00026717372,0.000010365815,0.000012811942,0.00007853919,0.98351675],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993987,0.0000019974932,0.0001624801,0.0001692367,0.00014455042,0.00012303365],"domain_scores_gemma":[0.9996935,0.000016909673,0.000021190584,0.00019275838,0.000018140006,0.000057510777],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000035056477,0.00020582085,0.00017572207,0.00010165579,0.000016862059,0.000017469312,0.000073406074,0.00013915832,0.0017266556],"category_scores_gemma":[5.261592e-7,0.00016843603,0.00005826048,0.0000050484996,0.000024598552,0.00003446302,0.000059936032,0.00004090526,0.00018800762],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.894888e-7,5.2438895e-7,9.577959e-7,0.000059810445,0.00014506147,0.000012957309,0.000001008385,0.00016420156,0.0000057097436,0.9621328,0.036823537,0.0006525169],"study_design_scores_gemma":[0.00014064388,0.000007744522,0.000009669989,0.00016797747,0.00002220321,0.000010737006,0.0000019912293,0.00056707585,0.000021132331,0.0016387593,0.9971765,0.00023554263],"about_ca_topic_score_codex":0.0000020080515,"about_ca_topic_score_gemma":0.0000070150168,"teacher_disagreement_score":0.96049404,"about_ca_system_score_codex":0.000095327836,"about_ca_system_score_gemma":0.000004372355,"threshold_uncertainty_score":0.9991859},"labels":[],"label_agreement":null},{"id":"W2505600910","doi":"10.1109/pestse.2016.7516468","title":"The effect of solar PV module price and capital cost on the levelized electricity cost of the solar PV power plant in the context of India","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Cost of electricity by source; Grid parity; Photovoltaic system; Capital cost; Renewable energy; Context (archaeology); Stand-alone power system; Power station; Environmental economics; Electricity; Electricity generation; Environmental science; Engineering; Electrical engineering; Photovoltaics; Economics; Distributed generation; Power (physics); Physics; Geography","score_opus":0.005182613017970826,"score_gpt":0.17886828502298607,"score_spread":0.17368567200501525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2505600910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99301445,0.00018081564,0.0010072425,0.00049786974,0.00020040217,0.0010743695,0.0000531888,0.000022750392,0.0039489307],"genre_scores_gemma":[0.9995882,0.00012308557,0.0000065587055,0.00011099813,0.000018920035,0.00006843506,0.000001310182,0.000019378376,0.00006314163],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986623,0.00028053453,0.0003156603,0.00014116148,0.0003316099,0.00026874963],"domain_scores_gemma":[0.99722075,0.0020682155,0.00010636151,0.00054838404,0.000033331988,0.000022922737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012393518,0.00018316608,0.00025534988,0.000056233024,0.0000782556,0.000017068001,0.0005283382,0.000062061146,0.000031921703],"category_scores_gemma":[0.00027213997,0.00006205635,0.000080500686,0.00022493809,0.00012606745,0.000057488334,0.00010825436,0.00018114356,0.0000054652683],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0048601506,0.0012814936,0.2590566,0.001396472,0.0053669885,0.000041198437,0.02437236,0.052908625,0.27279106,0.21872172,0.10157949,0.05762384],"study_design_scores_gemma":[0.0042692004,0.00072890916,0.2980029,0.00027008986,0.000099994286,0.000007908959,0.0009865924,0.009738016,0.67227066,0.00017760802,0.01304793,0.00040020546],"about_ca_topic_score_codex":0.0002080733,"about_ca_topic_score_gemma":0.00020599266,"teacher_disagreement_score":0.39947957,"about_ca_system_score_codex":0.00005785037,"about_ca_system_score_gemma":0.000013634678,"threshold_uncertainty_score":0.25305846},"labels":[],"label_agreement":null},{"id":"W2505614348","doi":"10.1504/ijgw.2016.077911","title":"Modelling residential house electricity demand profile and analysis of peaksaver program using ANN: case study for Toronto, Canada","year":2016,"lang":"en","type":"article","venue":"International Journal of Global Warming","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Electricity; Electricity demand; Environmental science; Energy demand; Peak load; Peak demand; Demand response; Electricity generation; Agricultural economics; Environmental engineering; Environmental economics; Engineering; Economics; Automotive engineering; Power (physics)","score_opus":0.014754143373211938,"score_gpt":0.2771580823467446,"score_spread":0.26240393897353265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2505614348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81966835,0.00021226528,0.17942476,0.000020963078,0.0004464299,0.00014788979,0.00003238139,0.000018640976,0.000028316968],"genre_scores_gemma":[0.99439436,0.000031304553,0.00535975,0.0000069177327,0.00018199901,0.000005097247,8.8299106e-7,0.000013338005,0.0000063492125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988166,0.000024767034,0.00046275713,0.00011280281,0.00042437483,0.00015871442],"domain_scores_gemma":[0.9992475,0.00006244665,0.00019482369,0.00007703631,0.0003379272,0.00008028573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000263746,0.00011175627,0.00023624653,0.00010559359,0.000039278468,0.00003679247,0.0001720536,0.000025521806,0.000013519955],"category_scores_gemma":[0.00004555081,0.00009067228,0.00009285024,0.00015521156,0.000013523313,0.00026844296,0.000048074035,0.000038057533,3.7915477e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008763157,0.000084131396,0.020713627,0.00001420628,0.0033046973,0.00074330927,0.0001219769,0.967332,0.00021266486,0.00003894113,0.00021719879,0.007129629],"study_design_scores_gemma":[0.0011046015,0.00013005156,0.0021609175,0.000049472666,0.0009357015,0.00058085175,0.00050332886,0.993689,0.0004236505,0.000031921114,0.0002368668,0.00015363557],"about_ca_topic_score_codex":0.12640972,"about_ca_topic_score_gemma":0.234609,"teacher_disagreement_score":0.17472602,"about_ca_system_score_codex":0.0010659014,"about_ca_system_score_gemma":0.000102813225,"threshold_uncertainty_score":0.8794076},"labels":[],"label_agreement":null},{"id":"W2508374117","doi":"10.5267/j.uscm.2016.6.001","title":"Optimization methods applied to renewable and sustainable energy: A review","year":2016,"lang":"en","type":"review","venue":"Uncertain Supply Chain Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Sustainable energy; Environmental economics; Energy (signal processing); Business; Computer science; Natural resource economics; Economics; Engineering","score_opus":0.01641187370140484,"score_gpt":0.28481063987123284,"score_spread":0.268398766169828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2508374117","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.218577e-9,0.59091794,0.3691162,0.00012954381,0.0002571032,0.0017693827,0.000009325494,0.00035795374,0.037442558],"genre_scores_gemma":[1.5239429e-7,0.9008038,0.068317756,0.0006655724,0.00022460558,0.004351916,0.00022549975,0.00026436916,0.025146352],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99598855,0.0002554573,0.0010419913,0.0010564162,0.00044220217,0.0012153932],"domain_scores_gemma":[0.99793667,0.00018409309,0.00018481832,0.0013230757,0.00006275738,0.00030857336],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018736152,0.0010369464,0.002041254,0.00097090687,0.00016007424,0.00014754078,0.000759626,0.00023046206,0.00039527655],"category_scores_gemma":[0.000040723324,0.00086972263,0.00027245047,0.0013534745,0.000043006028,0.00012514257,0.0010060191,0.00017022261,0.0000676323],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002180957,0.000013018371,3.3916187e-8,0.08104079,0.00045446816,0.00004460074,0.000011968031,0.14342993,7.674245e-8,0.012462399,0.08960826,0.67293227],"study_design_scores_gemma":[0.00021455016,0.000023575738,6.1701854e-8,0.026758548,0.00086726923,0.0000047942804,0.00005054219,0.0023750465,0.0000011588078,0.00027925274,0.9684661,0.0009590878],"about_ca_topic_score_codex":0.00006652145,"about_ca_topic_score_gemma":0.0000065953423,"teacher_disagreement_score":0.87885785,"about_ca_system_score_codex":0.0009843673,"about_ca_system_score_gemma":0.000038146864,"threshold_uncertainty_score":0.99937534},"labels":[],"label_agreement":null},{"id":"W2510963664","doi":"10.1016/j.enbuild.2016.08.008","title":"Exploiting heuristic algorithms to efficiently utilize energy management controllers with renewable energy sources","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":294,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"King Saud University","keywords":"Knapsack problem; Computer science; Energy management; Firefly algorithm; Mathematical optimization; Smart grid; Genetic algorithm; Particle swarm optimization; Controller (irrigation); Heuristic; Benchmark (surveying); Renewable energy; Algorithm; Energy (signal processing); Engineering; Mathematics; Artificial intelligence","score_opus":0.00469863525584784,"score_gpt":0.16639660687099928,"score_spread":0.16169797161515143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2510963664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05398541,0.0010999093,0.9160261,0.00039830967,0.0007087544,0.00009839821,0.0000086098735,0.0008686562,0.026805809],"genre_scores_gemma":[0.98141265,0.0008500833,0.00475445,0.00066431524,0.00032495434,0.00020261682,0.00000756779,0.000116969306,0.0116664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997853,0.000035998226,0.00035420383,0.0006179173,0.00038236688,0.000756556],"domain_scores_gemma":[0.9990767,0.00011896704,0.00006627873,0.00039837707,0.000045520097,0.00029412756],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017158233,0.0004433786,0.00038545628,0.0003626636,0.0002058751,0.000109930894,0.00031113042,0.00009097052,0.000070565875],"category_scores_gemma":[0.000013273674,0.00032594646,0.000072048795,0.00041339773,0.0000855768,0.00018457642,0.0002026263,0.00004455901,0.000005117305],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017061608,0.000070432005,0.0002180483,0.000058328063,0.0006038077,0.00016307102,0.00014146538,0.7868508,0.0048369025,0.084746905,0.021312855,0.10082673],"study_design_scores_gemma":[0.0023348688,0.00021546929,0.00017182097,0.00035171598,0.0001096096,0.000023427392,0.00022090117,0.02047014,0.031485077,0.000633035,0.9430612,0.0009227754],"about_ca_topic_score_codex":0.0008688281,"about_ca_topic_score_gemma":0.00042263244,"teacher_disagreement_score":0.92742723,"about_ca_system_score_codex":0.00012302857,"about_ca_system_score_gemma":0.000008617665,"threshold_uncertainty_score":0.99991924},"labels":[],"label_agreement":null},{"id":"W2519547876","doi":"10.1115/1.2009-dec-1","title":"Building the New Electric Grid","year":2009,"lang":"en","type":"article","venue":"Mechanical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CARE Canada","funders":"","keywords":"Electrification; Smart grid; Grid; Control (management); Computer science; Electricity; Telecommunications; Computer security; Systems engineering; Electrical engineering; Engineering","score_opus":0.004669840081651073,"score_gpt":0.17961593713401508,"score_spread":0.174946097052364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2519547876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01113255,0.0005757667,0.9826862,0.00079145376,0.0016941063,0.00014613736,4.1014766e-7,0.0015966883,0.0013766655],"genre_scores_gemma":[0.98937666,0.00005885737,0.00902902,0.00022265484,0.0011620694,0.000010900433,0.000001283424,0.000047873848,0.00009067732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903274,0.000006184032,0.00019168755,0.00016178389,0.00019124696,0.00041635038],"domain_scores_gemma":[0.9995081,0.000048224952,0.000010868272,0.00030508888,0.000008116577,0.00011959122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014857782,0.0001886849,0.00014668732,0.0000945803,0.00004019271,0.000048804388,0.0003215368,0.00006206623,0.000033833894],"category_scores_gemma":[0.000051655345,0.00015559951,0.00007513736,0.00045128842,0.0000019418537,0.000087209875,0.000033971468,0.00026507885,0.000042143714],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012115308,0.000004603274,3.2657115e-7,0.000006495876,0.000023164548,0.0000065257586,0.000008789662,0.88299114,0.0512085,0.050186332,0.0052838903,0.010279003],"study_design_scores_gemma":[0.00017086422,0.0000365727,0.00026185843,0.000018844426,0.000019489518,0.00001067781,0.0000018144084,0.87500983,0.033991557,0.001011001,0.089220114,0.0002473603],"about_ca_topic_score_codex":0.0000040374853,"about_ca_topic_score_gemma":0.0000012119742,"teacher_disagreement_score":0.9782441,"about_ca_system_score_codex":0.00009583431,"about_ca_system_score_gemma":0.000006512446,"threshold_uncertainty_score":0.6345164},"labels":[],"label_agreement":null},{"id":"W2521596927","doi":"10.1109/tii.2016.2610951","title":"A Game Theoretic Approach to Real-Time Robust Distributed Generation Dispatch","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Scalability; Computer science; Distributed generation; Distributed computing; Electricity generation; Smart grid; Grid; Population; Mathematical optimization; Economic dispatch; Electric power system; Power (physics); Engineering; Renewable energy; Electrical engineering","score_opus":0.0341092185378073,"score_gpt":0.20642373274700226,"score_spread":0.17231451420919497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2521596927","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04733467,7.5844775e-7,0.94391805,0.00016370043,0.0012610725,0.00045561072,0.0001930886,0.0005205093,0.006152554],"genre_scores_gemma":[0.99421203,0.000060822415,0.003993267,0.00006526817,0.00045325933,0.0002399469,0.000076998556,0.000058838792,0.00083958276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985741,0.000035595476,0.0005811644,0.00012909016,0.0003117077,0.00036836465],"domain_scores_gemma":[0.99919915,0.000074065785,0.000055522138,0.00043996013,0.000048245118,0.00018304057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022264704,0.00026262022,0.00023184692,0.00022986728,0.000097830896,0.00008495454,0.0002242402,0.00021354502,0.00012185366],"category_scores_gemma":[0.000011379599,0.00020432842,0.000089115085,0.00046024844,0.000043822605,0.0003639975,0.0000029566222,0.00020858568,0.00041676208],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023398612,0.00005420336,0.000002009183,0.00001800401,0.00007438967,4.0997608e-7,0.0002679145,0.9817262,0.0006417686,0.0003318504,0.010993051,0.0058667753],"study_design_scores_gemma":[0.0019528788,0.00015062334,0.000015180468,0.00011756887,0.00011988281,0.000006882371,0.00017762552,0.9619803,0.026269881,0.000048578488,0.008510742,0.000649882],"about_ca_topic_score_codex":0.00001660052,"about_ca_topic_score_gemma":0.0000056366025,"teacher_disagreement_score":0.94687736,"about_ca_system_score_codex":0.00033528238,"about_ca_system_score_gemma":0.000026601989,"threshold_uncertainty_score":0.8332271},"labels":[],"label_agreement":null},{"id":"W2523708194","doi":"10.1145/2950046","title":"A Truthful Incentive Mechanism for Emergency Demand Response in Geo-Distributed Colocation Data Centers","year":2016,"lang":"en","type":"article","venue":"ACM Transactions on Modeling and Performance Evaluation of Computing Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; National Science Foundation","keywords":"Incentive; Computer science; Demand response; Server; Backup; Remuneration; Environmental economics; Load management; Computer security; Electricity; Business; Database; Computer network; Finance; Microeconomics; Economics; Engineering","score_opus":0.06528025906781529,"score_gpt":0.2937210611257679,"score_spread":0.2284408020579526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523708194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48938835,0.000042518914,0.5096686,0.000049281367,0.00047770148,0.00028957787,0.000038225342,0.000040414867,0.000005332958],"genre_scores_gemma":[0.99869615,0.000187949,0.00093112653,0.0000034299892,0.00003887512,0.000069776914,0.000046796602,0.00001789702,0.000007982048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986383,0.00014488073,0.0004857545,0.00024425893,0.00031112938,0.00017567756],"domain_scores_gemma":[0.99902713,0.0001537563,0.000080963895,0.000447801,0.00025835095,0.000031975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026202044,0.00012953884,0.00016886838,0.00021643136,0.00010829497,0.000013989657,0.00021346998,0.00006132825,0.000004182571],"category_scores_gemma":[0.00009673566,0.000116657844,0.000024526647,0.00017447639,0.000011472491,0.0002246179,0.0000110795745,0.000059444155,0.0000016276766],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017841309,0.000021936472,0.00011164663,0.00010097095,0.000043615404,3.5908883e-8,0.0002500306,0.99197865,0.00045875786,0.00004086649,0.000014927738,0.006800126],"study_design_scores_gemma":[0.0012421387,0.00010345603,0.00092810113,0.00038240483,0.00006126534,9.2002716e-7,0.0001913905,0.996398,0.0004323432,0.00011823032,0.000011834112,0.00012994955],"about_ca_topic_score_codex":0.00002500124,"about_ca_topic_score_gemma":0.000012065767,"teacher_disagreement_score":0.5093078,"about_ca_system_score_codex":0.00017907222,"about_ca_system_score_gemma":0.00003252777,"threshold_uncertainty_score":0.4757169},"labels":[],"label_agreement":null},{"id":"W2523970097","doi":"10.2139/ssrn.2826055","title":"An Analysis of Time-Based Pricing in Electricity Supply Chains","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada); University of Calgary","funders":"","keywords":"Supply chain; Electricity pricing; Electricity; Business; Electricity market; Economics; Industrial organization; Microeconomics; Engineering; Electrical engineering","score_opus":0.002942269662731336,"score_gpt":0.19117888281611384,"score_spread":0.1882366131533825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523970097","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80681795,0.0002752939,0.19232976,0.00010228289,0.00005642281,0.000057198962,0.0000021007306,0.00006992264,0.000289076],"genre_scores_gemma":[0.9989671,0.0006438687,0.00010621076,0.000020166533,0.00007712558,0.000004808338,0.000004183025,0.000029120745,0.00014737916],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976994,0.00007124697,0.00035463428,0.0001581453,0.00024382258,0.0014727531],"domain_scores_gemma":[0.9995088,0.00006049092,0.000078042365,0.0002466202,0.000039415227,0.00006660577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001188694,0.00015367704,0.00030192488,0.0010927732,0.000034138044,0.000014878042,0.00028555203,0.00005701242,0.00007246143],"category_scores_gemma":[0.000026745289,0.000120785975,0.00013547667,0.0012441847,0.00001785472,0.00016769947,0.000011229738,0.00044480903,0.000008935359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035120123,0.00009114336,0.05489411,0.000007619441,0.0010345243,0.000005493824,0.00004931062,0.8927008,0.028708806,0.0073957853,0.000029739365,0.015047588],"study_design_scores_gemma":[0.001721802,0.0004530844,0.08561638,0.000053993783,0.00056628976,0.000012344714,0.00010291028,0.89486647,0.012974103,0.00292771,0.00022816943,0.00047672613],"about_ca_topic_score_codex":0.000088310946,"about_ca_topic_score_gemma":0.002004701,"teacher_disagreement_score":0.19222356,"about_ca_system_score_codex":0.0016054615,"about_ca_system_score_gemma":0.0002611342,"threshold_uncertainty_score":0.4925509},"labels":[],"label_agreement":null},{"id":"W2526422986","doi":"10.1109/tsg.2015.2479557","title":"Optimal Residential Demand Response for Multiple Heterogeneous Homes With Real-Time Price Prediction in a Multiagent Framework","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Electricity; Payment; Computer science; Electricity market; Load management; Electric power system; Control (management); Peak demand; Energy management system; Electricity pricing; Operations research; Energy management; Mathematical optimization; Stability (learning theory); Power (physics); Energy (signal processing); Engineering","score_opus":0.013570590939498918,"score_gpt":0.22168122751775815,"score_spread":0.20811063657825923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2526422986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46926272,0.000025801522,0.5283015,0.00004446211,0.0013205579,0.00053012534,0.000075770295,0.00037787756,0.00006123475],"genre_scores_gemma":[0.97596174,0.000060447263,0.022429675,0.000026707436,0.0002762012,0.0007056232,0.00002019036,0.0001102208,0.00040918842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826974,0.00011226683,0.0003850209,0.00041011456,0.00036116742,0.0004617205],"domain_scores_gemma":[0.9989244,0.00030111993,0.000045432396,0.0004481148,0.00007388113,0.00020709175],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048069775,0.0003106495,0.00028706182,0.00039992135,0.00011469194,0.000061881416,0.00017303282,0.00017168009,0.00004551237],"category_scores_gemma":[0.000028978924,0.0003131221,0.000106977386,0.0003650923,0.000046358582,0.00022137148,0.0000029425769,0.00025488468,0.000076986784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003277974,0.00015473751,0.00013903379,0.000039671966,0.00014993767,0.00005379194,0.0005062912,0.99199003,0.0016052722,0.0000017708103,0.0018700653,0.00021143063],"study_design_scores_gemma":[0.004613164,0.001116593,0.0037321341,0.00019963582,0.00014607645,0.00006813619,0.00017908425,0.9353308,0.047700603,0.000014279945,0.006264971,0.0006344983],"about_ca_topic_score_codex":0.000098778604,"about_ca_topic_score_gemma":0.0002259238,"teacher_disagreement_score":0.506699,"about_ca_system_score_codex":0.0003930548,"about_ca_system_score_gemma":0.00004469013,"threshold_uncertainty_score":0.9999321},"labels":[],"label_agreement":null},{"id":"W2527875214","doi":"10.1145/3003977.3003997","title":"An Emergency Demand Response Mechanism for Cloud Computing","year":2016,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cloud computing; Provisioning; Server; Computer science; Demand response; Data center; Resource (disambiguation); Distributed computing; Electricity; Database; Operating system; Computer network; Engineering","score_opus":0.053353420386521876,"score_gpt":0.3245248779711337,"score_spread":0.27117145758461186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527875214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46322218,0.031681795,0.4972063,0.00080121006,0.003847705,0.0023228151,0.000011521286,0.00049002044,0.00041644776],"genre_scores_gemma":[0.8860509,0.10624037,0.0064967447,0.00030088663,0.00039630054,0.00032795314,0.00002594552,0.00006292314,0.000098006225],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796116,0.00018816898,0.0006148826,0.00029953572,0.0005998516,0.00033639424],"domain_scores_gemma":[0.9980962,0.0003365434,0.00013235919,0.00088974927,0.0004483022,0.00009679246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065234923,0.00021831399,0.00028740527,0.00032839045,0.00013064042,0.000018910334,0.00049751205,0.00006367799,0.00033489257],"category_scores_gemma":[0.0029218725,0.00017014185,0.00009409931,0.0010870664,0.00001091561,0.00038670778,0.00007044299,0.00006408307,0.00012982912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005590886,0.000057281963,0.0012865432,0.0031832284,0.00012453487,6.8203735e-7,0.000075243785,0.049906828,0.0033134522,0.0021690466,0.0262617,0.9135656],"study_design_scores_gemma":[0.0013751265,0.00037919884,0.009957084,0.0019893094,0.00039487096,0.0000043427417,0.00001136453,0.9290528,0.0042533916,0.001142894,0.050693687,0.0007459043],"about_ca_topic_score_codex":5.214903e-7,"about_ca_topic_score_gemma":7.61447e-7,"teacher_disagreement_score":0.9128196,"about_ca_system_score_codex":0.00023324392,"about_ca_system_score_gemma":0.000034311786,"threshold_uncertainty_score":0.69381833},"labels":[],"label_agreement":null},{"id":"W2527878471","doi":"10.1109/sege.2016.7589542","title":"Power management strategy for sizing battery system for peak load limiting in a university campus","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Photovoltaic system; Sizing; Peaking power plant; Battery (electricity); Limit (mathematics); Automotive engineering; Grid-connected photovoltaic power system; Grid; Reliability engineering; Computer science; Electricity; Power (physics); Electric power system; Limiting; Electrical engineering; Engineering; Maximum power point tracking; Renewable energy; Distributed generation; Voltage; Inverter","score_opus":0.01105239511851086,"score_gpt":0.1859266282791893,"score_spread":0.17487423316067843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527878471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13891916,0.0000651475,0.7027744,0.00021383757,0.0010615574,0.0012058034,0.00001968934,0.0008265532,0.15491383],"genre_scores_gemma":[0.9938797,0.0000123256905,0.0027902685,0.000021273685,0.000060742317,0.00004097047,0.0000025123184,0.000032039312,0.0031602124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99915105,0.000010441572,0.00016923451,0.00021979885,0.000098054086,0.0003514301],"domain_scores_gemma":[0.9995946,0.000113250906,0.000024279028,0.0001942415,0.000029181721,0.000044422526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021738761,0.00014041422,0.00014283443,0.0001378592,0.000044747445,0.000022260547,0.0001546036,0.00004361884,0.000023066239],"category_scores_gemma":[0.0000070536257,0.00012242352,0.000065476066,0.00010010405,0.00000876102,0.00015166821,0.00006335628,0.000027386366,0.000016928776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024870408,0.00011258729,0.002942718,0.0044135526,0.00094649516,0.0002251845,0.00042510225,0.69209266,0.004434862,0.22560582,0.025872668,0.04267965],"study_design_scores_gemma":[0.023619354,0.0005500454,0.030220421,0.0032171567,0.00037153385,0.000018211407,0.028890327,0.3411008,0.010001146,0.0006485839,0.5576735,0.0036889138],"about_ca_topic_score_codex":0.00001528226,"about_ca_topic_score_gemma":0.00008454649,"teacher_disagreement_score":0.8549605,"about_ca_system_score_codex":0.00068112847,"about_ca_system_score_gemma":0.000007680224,"threshold_uncertainty_score":0.4992286},"labels":[],"label_agreement":null},{"id":"W2529078127","doi":"10.1016/j.enbuild.2016.09.070","title":"Adaptive residential demand-side management using rule-based techniques in smart grid environments","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Thermostat; HVAC; Smart grid; Demand side; Energy management; Demand response; Computer science; Real-time computing; Preference; Building automation; Wireless; Grid; Energy (signal processing); Home automation; Energy management system; Air conditioning; Engineering; Telecommunications; Electrical engineering","score_opus":0.007251424155195455,"score_gpt":0.18837365192553066,"score_spread":0.1811222277703352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2529078127","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5432333,0.00042076764,0.44894266,0.00016477476,0.000612012,0.00018804181,0.0000062420368,0.0003899259,0.0060422923],"genre_scores_gemma":[0.9863907,0.00047728722,0.012286102,0.0001227746,0.00016090593,0.00006115449,0.0000037925613,0.00004798707,0.00044927056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988751,0.000031520598,0.00024378492,0.00031102682,0.00019925222,0.00033934985],"domain_scores_gemma":[0.9996413,0.000032567692,0.000037247435,0.00021554419,0.0000045101838,0.00006880461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001860727,0.00022244311,0.00017682074,0.0002859441,0.00006166064,0.000027948168,0.00014623924,0.00008406204,0.000034916622],"category_scores_gemma":[0.0000040824334,0.00019049192,0.000043297285,0.00013445482,0.00006053214,0.00020174932,0.00012514381,0.000055072956,0.0000041028634],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055130606,0.00039857256,0.023846755,0.00031536107,0.0010213462,0.0010336898,0.00023471742,0.36437336,0.29445904,0.09292035,0.009654431,0.21119106],"study_design_scores_gemma":[0.0028456813,0.00013926241,0.024855873,0.00099348,0.00014167264,0.000015049459,0.00006549718,0.021716204,0.6644753,0.003587143,0.27974245,0.0014223547],"about_ca_topic_score_codex":0.00015476262,"about_ca_topic_score_gemma":0.00006274572,"teacher_disagreement_score":0.44315743,"about_ca_system_score_codex":0.00018831664,"about_ca_system_score_gemma":0.0000040337113,"threshold_uncertainty_score":0.7768035},"labels":[],"label_agreement":null},{"id":"W2530261731","doi":"10.1016/b978-0-12-805343-0.00002-4","title":"Smart energy grid infrastructures and interconnected micro energy grids","year":2016,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Renewable energy; Smart grid; Energy supply; Distributed generation; Electricity; Environmental economics; Engineering; Grid; Energy engineering; Reliability (semiconductor); Energy (signal processing); Computer science; Power (physics); Electrical engineering","score_opus":0.004663349259383663,"score_gpt":0.1692184986572076,"score_spread":0.16455514939782392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2530261731","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009154119,0.0028980607,0.0005135104,0.000036478807,0.0034506246,0.00011786541,0.000125718,0.0005878708,0.9921783],"genre_scores_gemma":[0.0046809707,0.0015631246,0.0003480324,0.0005191507,0.0022254132,0.0000777439,0.00010346695,0.00039700101,0.9900851],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978924,0.000025933306,0.0006005615,0.0006441719,0.00029368437,0.00054329465],"domain_scores_gemma":[0.99870473,0.000080908896,0.00012588952,0.00079176115,0.00006801154,0.00022868201],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008709787,0.00089789735,0.0007345136,0.00044806243,0.000084322666,0.00009035284,0.0004294882,0.00051068433,0.0005126575],"category_scores_gemma":[0.000009113211,0.00079140003,0.00021164016,0.0000203774,0.0001844658,0.00007926136,0.00038144278,0.00031613169,0.000033527274],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013862544,0.0000022252743,0.000006026081,0.00011592835,0.00059427955,0.00006215695,0.000051897587,0.00009552478,0.0007106668,0.053001627,0.009848273,0.9354975],"study_design_scores_gemma":[0.00037996063,0.000042272928,0.000048651124,0.0004366831,0.00012507517,0.000040481737,0.000002452564,0.00008780015,0.0014725177,0.013120984,0.98333746,0.0009056335],"about_ca_topic_score_codex":0.00000536687,"about_ca_topic_score_gemma":0.00021186996,"teacher_disagreement_score":0.9734892,"about_ca_system_score_codex":0.00019861928,"about_ca_system_score_gemma":0.000029914283,"threshold_uncertainty_score":0.99945366},"labels":[],"label_agreement":null},{"id":"W2531947827","doi":"10.1109/isgt-mideast.2011.6220825","title":"Time averaging and threshold effect on statistics of residential power consumption","year":2011,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Metering mode; Electricity; Computer science; Net metering; Consumption (sociology); Interval (graph theory); Power (physics); Demand response; Energy consumption; Interval data; Real-time computing; Reliability engineering; Statistics; Environmental economics; Simulation; Engineering; Measure (data warehouse); Data mining; Electrical engineering; Mathematics; Economics; Renewable energy","score_opus":0.010349337800571533,"score_gpt":0.1959242931306617,"score_spread":0.18557495533009016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531947827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94279116,0.000030192126,0.013893065,0.0000023062012,0.00027459752,0.0000898595,0.000004659113,0.0001358965,0.042778272],"genre_scores_gemma":[0.9982514,0.0000148463305,0.0013349239,0.000013239564,0.0000144712085,0.0000032301393,0.0000033934155,0.000014595787,0.0003499495],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996386,0.0000093105955,0.00009741482,0.000077707875,0.000086652326,0.00009032285],"domain_scores_gemma":[0.9998052,0.000034897825,0.000011706829,0.00011606468,0.000007572527,0.000024551713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000087898465,0.0000731144,0.00008533594,0.00006410643,0.000012206454,0.0000067605333,0.00003758179,0.000021935155,0.00072470435],"category_scores_gemma":[0.000006172652,0.00006780309,0.000010876834,0.000024256937,0.000024279228,0.00005154683,0.000024176776,0.00003951717,0.00010489792],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008350933,0.00035131365,0.13117398,0.0025892875,0.002091368,0.0003290363,0.0056992765,0.26981565,0.06797552,0.27068692,0.23187624,0.0165763],"study_design_scores_gemma":[0.0031909302,0.001317628,0.47924125,0.00026496503,0.00023684869,0.000011388106,0.00004672385,0.26551428,0.24493188,0.0019777091,0.0021794895,0.0010868817],"about_ca_topic_score_codex":0.000013553664,"about_ca_topic_score_gemma":0.000004813389,"teacher_disagreement_score":0.34806728,"about_ca_system_score_codex":0.000013258821,"about_ca_system_score_gemma":0.0000010109898,"threshold_uncertainty_score":0.7935004},"labels":[],"label_agreement":null},{"id":"W2536097994","doi":"10.1109/iccchina.2016.7636905","title":"Dynamic elastic load scheduling achieving load balancing for smart grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Computer science; Dynamic demand; Load balancing (electrical power); Demand response; Scheduling (production processes); Distributed computing; Grid; Load management; Dynamic load testing; Power (physics); Electricity; Reliability engineering; Mathematical optimization; Engineering","score_opus":0.00607406667073331,"score_gpt":0.20109512312035435,"score_spread":0.19502105644962103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2536097994","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13950749,0.0002343721,0.84575814,0.0002951929,0.0027253886,0.00024209436,0.0000068715594,0.0010245697,0.010205894],"genre_scores_gemma":[0.9758527,0.00006373936,0.021597851,0.00008494428,0.00030935789,0.00008874476,0.0000043105065,0.00008623474,0.001912111],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986523,0.000009738174,0.00028142042,0.00028495706,0.0002561984,0.0005153892],"domain_scores_gemma":[0.9992671,0.00020919625,0.000028231932,0.00033345955,0.00006506957,0.00009697072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028746418,0.00023134635,0.00020483504,0.000086338376,0.0000785295,0.000044071276,0.00021000208,0.00006868403,0.0001308004],"category_scores_gemma":[0.00016825643,0.00017689176,0.00009618576,0.00012644693,0.000020185958,0.00021721586,0.000080993545,0.000075888565,0.0002342963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004285487,0.000043171312,0.003539361,0.00051853433,0.00040178068,0.000015163048,0.00012882265,0.852505,0.0939629,0.0042381566,0.008266934,0.0363373],"study_design_scores_gemma":[0.0019413095,0.00008027096,0.006417112,0.00047263445,0.00009510817,0.000007962656,0.00007958863,0.91517174,0.0051376405,0.00033765985,0.069327354,0.00093161745],"about_ca_topic_score_codex":0.000017062928,"about_ca_topic_score_gemma":0.00016147296,"teacher_disagreement_score":0.8363452,"about_ca_system_score_codex":0.0007173374,"about_ca_system_score_gemma":0.000034537294,"threshold_uncertainty_score":0.72134364},"labels":[],"label_agreement":null},{"id":"W2541156125","doi":"10.1109/sge.2012.6463961","title":"Simulation analysis for the design of high performance smart meter","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Key (lock); Smart meter; Metering mode; Computer science; Electricity; Power consumption; Performance indicator; Scheduling (production processes); Modularity (biology); Smart grid; Engineering; Power (physics); Computer security; Electrical engineering","score_opus":0.03066878932969239,"score_gpt":0.22345629171129555,"score_spread":0.19278750238160317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2541156125","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090573095,0.000046852456,0.9085484,0.000013211346,0.00019297613,0.000112490095,5.855076e-7,0.000053119747,0.00045924707],"genre_scores_gemma":[0.9896056,0.000010146185,0.010006653,0.000019958914,0.000068396264,0.000035002122,0.0000033595172,0.000009335218,0.00024152464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965954,0.0000074675213,0.000103591236,0.000039673843,0.00007118041,0.000118574615],"domain_scores_gemma":[0.9995327,0.00025581775,0.000013647869,0.00016488762,0.000018334424,0.000014611272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002221243,0.00005394402,0.00008111915,0.00007225283,0.000022627451,0.0000052774076,0.00006621584,0.000016516135,0.00009630873],"category_scores_gemma":[0.000010483881,0.00003546361,0.000045404944,0.0002143161,0.000006399636,0.00010851346,0.000011674569,0.00001608243,0.0000074362147],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033615997,0.0000044156545,0.0048658405,0.000011232247,0.00039865426,4.557687e-9,0.00003259865,0.9930454,0.000058038087,0.00029422,0.00019994653,0.0010862891],"study_design_scores_gemma":[0.000066761415,0.000007840908,0.05746947,7.6152986e-7,0.00027317673,1.3234555e-8,0.000007570299,0.9368198,0.0036521473,0.000005864534,0.001651076,0.000045544486],"about_ca_topic_score_codex":0.000012601042,"about_ca_topic_score_gemma":0.0000025565018,"teacher_disagreement_score":0.89903253,"about_ca_system_score_codex":0.000016521497,"about_ca_system_score_gemma":7.991296e-7,"threshold_uncertainty_score":0.14461641},"labels":[],"label_agreement":null},{"id":"W2546974086","doi":"10.1109/ccece.2016.7726766","title":"Optimization of domestic energy consumption","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Optimization problem; Energy consumption; Mathematical optimization; Energy (signal processing); Simple (philosophy); Energy minimization; Optimization algorithm; Solar energy; Algorithm; Engineering; Mathematics","score_opus":0.007590911718702231,"score_gpt":0.18978622815419674,"score_spread":0.1821953164354945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2546974086","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068013943,0.0000355066,0.97587913,0.000029347204,0.00023287516,0.000015149955,6.476602e-7,0.00018081102,0.016825153],"genre_scores_gemma":[0.99404025,0.00023770655,0.0049735103,0.000012717444,0.000026530719,0.000006410753,0.000001850553,0.00001030204,0.00069070264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974036,0.0000044665207,0.00008899587,0.000047543526,0.00005460236,0.00006401453],"domain_scores_gemma":[0.9998381,0.00002393502,0.000009380094,0.000099837154,0.000011894187,0.000016864311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000024724384,0.000042560692,0.0000480279,0.000052646115,0.0000049013697,0.0000023228017,0.000037739872,0.000018050547,0.0007047919],"category_scores_gemma":[0.0000064261176,0.000029690229,0.000012689241,0.00004346379,0.000012296453,0.00005691057,0.000010869185,0.00000560411,0.000022004186],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010948311,0.0000037526197,0.00027466012,0.0000110477995,0.000014157741,4.5397977e-7,0.0000024522221,0.97960067,0.0021591277,0.01170522,0.0013670997,0.0048602507],"study_design_scores_gemma":[0.0008337221,0.000032688007,0.0048960494,0.0000647615,0.000027152593,0.0000034917236,0.0000051518346,0.938994,0.04130552,0.00034358542,0.013238296,0.0002556187],"about_ca_topic_score_codex":0.000005115502,"about_ca_topic_score_gemma":0.0000032779362,"teacher_disagreement_score":0.9872389,"about_ca_system_score_codex":0.00002324211,"about_ca_system_score_gemma":0.0000013891034,"threshold_uncertainty_score":0.77169776},"labels":[],"label_agreement":null},{"id":"W2547101057","doi":"10.1109/ccece.2016.7726794","title":"Wireless sensor networks with pressure-based energy forecasting: A simulation study","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wireless sensor network; Computer science; Reliability (semiconductor); Real-time computing; Energy management; Software deployment; Wireless; Wireless network; Energy (signal processing); Node (physics); Reliability engineering; Power (physics); Computer network; Engineering; Telecommunications","score_opus":0.014314182002174682,"score_gpt":0.1897715170090266,"score_spread":0.17545733500685193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547101057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11945185,0.000015933174,0.87588924,0.00002855768,0.00018525754,0.00016869079,7.15915e-7,0.00061361643,0.003646139],"genre_scores_gemma":[0.99771655,0.0000015009077,0.0007170457,0.00003917843,0.0001712012,0.0000572268,0.0000022565403,0.000053209336,0.0012418423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991944,0.00002645256,0.00015361566,0.00019735287,0.00018107313,0.0002471187],"domain_scores_gemma":[0.99945575,0.00013524966,0.000024061357,0.0002881416,0.0000390261,0.000057778336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008091439,0.00016670159,0.00013512769,0.00007239423,0.00003723674,0.000026382897,0.00009474857,0.000039587827,0.00007971109],"category_scores_gemma":[0.000005828931,0.00010342707,0.000023670582,0.00015256612,0.000014106722,0.000092141556,0.000023505181,0.000034074954,0.0000047375884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030037194,0.00004977721,0.004716213,0.000008036346,0.00011161971,0.000010315721,0.000015235043,0.98804957,0.000037753874,0.00012627363,0.00031135514,0.006533824],"study_design_scores_gemma":[0.0009891826,0.00011350531,0.002099363,0.000025076524,0.00004501909,4.6566495e-7,0.000024051024,0.9896748,0.00035896222,0.000002840197,0.0064732134,0.00019354132],"about_ca_topic_score_codex":0.000039594237,"about_ca_topic_score_gemma":0.00017380936,"teacher_disagreement_score":0.87826467,"about_ca_system_score_codex":0.000035574045,"about_ca_system_score_gemma":0.000004978704,"threshold_uncertainty_score":0.42176333},"labels":[],"label_agreement":null},{"id":"W2547310136","doi":"10.1109/ias.2016.7731970","title":"Load aggregation from generation-follows-load to load-follows-generation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Computer science; Load balancing (electrical power); Demand response; Load management; Electric power system; Grid; Load profile; Distributed computing; Electricity generation; Power (physics); Control engineering; Electrical engineering; Electricity; Engineering","score_opus":0.017199119279240855,"score_gpt":0.20528920766266276,"score_spread":0.1880900883834219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547310136","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5659544,0.00031295003,0.38543162,0.0014545454,0.004624743,0.00045567585,0.000025348869,0.0010525247,0.04068825],"genre_scores_gemma":[0.97127515,0.00010767213,0.008770976,0.00059237645,0.0026396692,0.0001710676,0.00006977601,0.000079371755,0.016293965],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99803126,0.00003524508,0.00039766225,0.0004471872,0.00073377433,0.00035487846],"domain_scores_gemma":[0.99896353,0.000042744356,0.000038985647,0.00059148914,0.00019494836,0.00016828245],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00025487086,0.00028986955,0.00020793735,0.00010019685,0.00009800831,0.00011440011,0.00021697416,0.00012182791,0.0011603358],"category_scores_gemma":[0.000114302566,0.00023432972,0.00008948756,0.00026562644,0.000014909803,0.0004350363,0.00006962181,0.000060240807,0.002087695],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009869513,0.00002869191,0.0003930487,0.000006928925,0.00014876858,0.0000075352004,0.0002522436,0.18744421,0.46333137,0.0014709344,0.30390579,0.043000624],"study_design_scores_gemma":[0.0016977363,0.0000782468,0.0016816804,0.00006644592,0.00007678822,0.0000015536427,0.00003476208,0.20762773,0.37566456,0.00023010896,0.41184577,0.0009946236],"about_ca_topic_score_codex":0.0006916638,"about_ca_topic_score_gemma":0.004522872,"teacher_disagreement_score":0.40532076,"about_ca_system_score_codex":0.0013496655,"about_ca_system_score_gemma":0.00009099466,"threshold_uncertainty_score":0.99975276},"labels":[],"label_agreement":null},{"id":"W2547715551","doi":"10.1109/ccece.2016.7726787","title":"Investigating the switch continuity principle assumed in Non-Intrusive Load Monitoring (NILM)","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Sampling (signal processing); Point (geometry); State (computer science); Data mining; Real-time computing; Algorithm; Mathematics; Telecommunications","score_opus":0.010923324245842754,"score_gpt":0.2286304771337519,"score_spread":0.21770715288790915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547715551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96404374,0.000040422416,0.0073757097,0.000370982,0.000957457,0.00024079083,8.863632e-7,0.0003129994,0.026657008],"genre_scores_gemma":[0.99684286,0.000024480749,0.0013444975,0.000046392888,0.0003141943,0.00008849907,3.682111e-7,0.000033325014,0.0013053626],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99885434,0.000026238486,0.00027433527,0.00020176024,0.00026346731,0.00037983817],"domain_scores_gemma":[0.99930555,0.00016306785,0.00003432642,0.00038337533,0.00004084708,0.00007282229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042014653,0.00017259252,0.00016181442,0.00006039239,0.00005169815,0.00004277449,0.00028764454,0.00005726108,0.00006384173],"category_scores_gemma":[0.00017370451,0.00010310399,0.000038566104,0.00022632332,0.000040532734,0.00017193226,0.00016917168,0.0001403234,0.00011000205],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009793763,0.00004810165,0.688257,0.00013486843,0.00023770447,0.000037671485,0.002236583,0.104515865,0.10766079,0.0069903247,0.003100403,0.08677094],"study_design_scores_gemma":[0.0016472626,0.000024984989,0.7788613,0.0003564022,0.000023176302,0.0000029841617,0.00044690905,0.034104165,0.16034248,0.00071650284,0.022827977,0.00064586767],"about_ca_topic_score_codex":0.00020824856,"about_ca_topic_score_gemma":0.00035802057,"teacher_disagreement_score":0.09060433,"about_ca_system_score_codex":0.0003537155,"about_ca_system_score_gemma":0.000020175616,"threshold_uncertainty_score":0.42044583},"labels":[],"label_agreement":null},{"id":"W2547978431","doi":"10.1109/ccece.2016.7726749","title":"Baseline load forecasting using a Bayesian approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Baseline (sea); Computer science; Flexibility (engineering); Bidding; Procurement; Bayesian probability; Scheduling (production processes); Demand response; Key (lock); Operations research; Machine learning; Artificial intelligence; Electricity; Engineering; Operations management","score_opus":0.03011486249896716,"score_gpt":0.1999349660073043,"score_spread":0.16982010350833712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547978431","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013282282,0.00003332461,0.89880127,0.000040926567,0.00023435935,0.000062565065,0.000001039166,0.0004556082,0.087088645],"genre_scores_gemma":[0.9187143,0.0000062840395,0.079835065,0.00004762642,0.00027695717,0.000010088175,0.0000012926854,0.000041938776,0.0010664449],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928904,0.000011264498,0.00015119229,0.00014839182,0.00014439905,0.00025572025],"domain_scores_gemma":[0.9996634,0.000034169065,0.0000116614265,0.00020992468,0.00002078713,0.00006002067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021425527,0.0001194099,0.00009715369,0.000061382205,0.000030265192,0.000016948574,0.00009817802,0.00003345711,0.00020921852],"category_scores_gemma":[0.000032335032,0.00008206851,0.000035866164,0.00012872528,0.000012429503,0.00012049484,0.000046147343,0.000033748172,0.000030456258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066030448,0.00003333844,0.0011497609,0.000101964826,0.00011359878,0.000017533612,0.000076580334,0.89914876,0.010728934,0.0027305032,0.009875762,0.07601665],"study_design_scores_gemma":[0.00023357285,0.0000046034943,0.000054339005,0.000024488727,0.000009925358,0.000008149151,0.000020211524,0.9879808,0.0019171574,0.000056125835,0.009533558,0.00015707647],"about_ca_topic_score_codex":0.000024364614,"about_ca_topic_score_gemma":0.0000115525345,"teacher_disagreement_score":0.90543205,"about_ca_system_score_codex":0.0001569848,"about_ca_system_score_gemma":0.000008356797,"threshold_uncertainty_score":0.33466566},"labels":[],"label_agreement":null},{"id":"W2548001738","doi":"10.1109/ccece.2016.7726733","title":"Novel method for power flow optimization in commercial buildings","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada); Powertech Labs (Canada)","funders":"","keywords":"Power flow; Computer science; Flow (mathematics); Power (physics); Electric power system; Mechanics; Physics","score_opus":0.01192689622632755,"score_gpt":0.2387796088131815,"score_spread":0.22685271258685394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548001738","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00062209344,0.000005511541,0.9912456,0.0004701598,0.00046344692,0.00012940385,0.0000038453495,0.00017130355,0.006888589],"genre_scores_gemma":[0.024351694,0.000007318321,0.9748521,0.00016164,0.00007669847,0.000056034067,0.0000033832218,0.000029823042,0.00046132924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995568,0.0000048762304,0.00012219929,0.000103557206,0.000056982208,0.00015561435],"domain_scores_gemma":[0.9997696,0.00007248739,0.000008054021,0.000110233676,0.000015658517,0.000023965225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015903659,0.00007842333,0.00008567968,0.00009002701,0.000012323529,0.000010672015,0.00007983243,0.000039162933,0.00018765306],"category_scores_gemma":[0.000027936077,0.00005971685,0.000027033286,0.00009189805,0.0000046630253,0.0001035287,0.000024704505,0.00002053023,0.000007878953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051230863,0.000010747574,0.00006145028,0.0000050390067,0.000011643194,1.7151211e-7,0.000023444412,0.9755235,0.0037896526,0.0054539475,0.006452425,0.008662907],"study_design_scores_gemma":[0.00095420977,0.000014754382,0.0006954697,0.000015172764,0.0000053711005,6.5432926e-7,0.000008262099,0.9432862,0.0034843085,0.00006541047,0.051322587,0.0001476426],"about_ca_topic_score_codex":0.000017226692,"about_ca_topic_score_gemma":0.00004167841,"teacher_disagreement_score":0.044870164,"about_ca_system_score_codex":0.000072335504,"about_ca_system_score_gemma":0.0000024435476,"threshold_uncertainty_score":0.24351825},"labels":[],"label_agreement":null},{"id":"W2548258090","doi":"10.1109/ccece.2016.7726670","title":"Simulation-based investigation of optimal demand-side primary frequency regulation","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Automatic frequency control; Phasor; Demand side; Governor; Control theory (sociology); Computer science; Power (physics); Electric power system; Turbine; Frequency deviation; Engineering; Control (management); Telecommunications; Economics","score_opus":0.01054643790507722,"score_gpt":0.19472763975824886,"score_spread":0.18418120185317163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548258090","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33337408,0.000017281913,0.66028005,0.000108006345,0.00013103406,0.000091135356,0.0000015518707,0.0002420382,0.0057548285],"genre_scores_gemma":[0.9815619,0.0000021976255,0.018111736,0.000049858514,0.000059079957,0.000011629864,0.000016676026,0.000019053301,0.00016785561],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938095,0.00001701952,0.00023068312,0.00010632377,0.00015724784,0.00010777273],"domain_scores_gemma":[0.9994759,0.00020577587,0.00003659541,0.00019767602,0.00004676404,0.000037272122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011458547,0.00008935837,0.000092714494,0.00010855557,0.000016967693,0.000006169501,0.0000652185,0.000045116103,0.00015257676],"category_scores_gemma":[0.00004330029,0.00006941444,0.000030973326,0.00012692112,0.000028866434,0.00019324537,0.0000108247295,0.000020109397,0.000024381216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002543439,0.000002894628,0.005609226,0.000033653145,0.000013570293,2.6168337e-7,0.000015210018,0.95400625,0.037595384,0.0015488827,0.00017570438,0.0009963954],"study_design_scores_gemma":[0.00038147363,0.000017611119,0.108717,0.000045743942,0.000013107187,6.111823e-8,0.0000024119013,0.8334706,0.056091044,0.00095000013,0.0001844736,0.00012647586],"about_ca_topic_score_codex":0.00001056807,"about_ca_topic_score_gemma":0.000005761765,"teacher_disagreement_score":0.6481878,"about_ca_system_score_codex":0.00009845798,"about_ca_system_score_gemma":0.000015042714,"threshold_uncertainty_score":0.2830639},"labels":[],"label_agreement":null},{"id":"W2548260028","doi":"10.1016/j.enbuild.2016.10.048","title":"A method for distinguishing appliance, lighting and plug load profiles from electricity ‘smart meter’ datasets","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Dalhousie University","funders":"National Research Council Canada","keywords":"Electricity; Smart meter; Electricity meter; Metering mode; Metre; Representativeness heuristic; Occupancy; Computer science; Electricity demand; Automotive engineering; Architectural engineering; Engineering; Environmental science; Electricity generation; Electrical engineering; Mechanical engineering; Statistics","score_opus":0.007953093046986503,"score_gpt":0.21994242225767108,"score_spread":0.21198932921068459,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548260028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.135359,0.0013861266,0.8609188,0.00022425187,0.00031615392,0.00014857757,0.00019116605,0.00035842854,0.0010974426],"genre_scores_gemma":[0.804221,0.0004863729,0.19340986,0.0002487747,0.0008172789,0.00022804529,0.0001102358,0.00008549221,0.00039297045],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989084,0.000021691201,0.00020783272,0.00039203512,0.00013195226,0.00033808468],"domain_scores_gemma":[0.9992645,0.00038589127,0.00005264503,0.00018260408,0.000024016495,0.00009037614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031090886,0.00021445433,0.00023688647,0.000067386136,0.00013570674,0.00008402736,0.00013996667,0.00007761713,0.000010486391],"category_scores_gemma":[0.00012133909,0.00016514969,0.000034510053,0.00011518434,0.000028693878,0.0002157973,0.00012087662,0.000055983994,9.048446e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001425453,0.000053499676,0.0037830626,0.00028720585,0.00066076324,0.000026416381,0.0003135224,0.0022891185,0.28781286,0.066852145,0.06015012,0.57762873],"study_design_scores_gemma":[0.000911061,0.000043999218,0.0007923468,0.0001843907,0.00008564385,0.000005746236,0.000016054755,0.025225075,0.17811722,0.0038981438,0.79020685,0.0005134933],"about_ca_topic_score_codex":0.0003436843,"about_ca_topic_score_gemma":0.000098360186,"teacher_disagreement_score":0.7300567,"about_ca_system_score_codex":0.000059824,"about_ca_system_score_gemma":0.0000074385825,"threshold_uncertainty_score":0.67346084},"labels":[],"label_agreement":null},{"id":"W2548710806","doi":"10.1049/cp.2014.1511","title":"Review on issues related to electric energy demand in distribution system for developing countries","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distribution (mathematics); Computer science; Energy (signal processing); Physics","score_opus":0.00619153746688337,"score_gpt":0.21746084676671742,"score_spread":0.21126930929983406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548710806","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012682862,0.017158343,0.9550235,0.0033199245,0.0009024631,0.000888074,0.0000053781027,0.0012674277,0.008751976],"genre_scores_gemma":[0.9817133,0.013549924,0.0012078944,0.0019902075,0.00011868894,0.0004981788,0.0001315736,0.00005738025,0.0007328865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992421,0.000025765807,0.0002631403,0.00015102114,0.000096964824,0.00022097473],"domain_scores_gemma":[0.9997088,0.00005984369,0.000017969664,0.00015207111,0.00003170054,0.000029655333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034578098,0.00012379323,0.00020312254,0.000087309534,0.00003122935,0.000020363435,0.00009595871,0.000042984873,0.000004466576],"category_scores_gemma":[0.000046535366,0.000113803726,0.000025009786,0.000359108,0.0000024818282,0.000047260066,0.000015575715,0.00003134693,0.000034320423],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013748471,0.000010226377,0.0001469196,0.004307888,0.00006164369,0.0000017332682,0.000025617315,0.1485313,0.00007485572,0.72381413,0.11700518,0.0060067843],"study_design_scores_gemma":[0.00020024304,0.000042674452,0.00048298694,0.0020821416,0.000014461522,0.0000012187031,0.0000052149576,0.05554036,0.0055491053,0.0001040923,0.9357667,0.0002108239],"about_ca_topic_score_codex":0.000031919313,"about_ca_topic_score_gemma":0.000050134327,"teacher_disagreement_score":0.9690304,"about_ca_system_score_codex":0.00034125015,"about_ca_system_score_gemma":0.000005509792,"threshold_uncertainty_score":0.46407813},"labels":[],"label_agreement":null},{"id":"W2549946723","doi":"10.1109/epec.2010.5697213","title":"The impact of smart grid residential energy management schemes on the carbon footprint of the household electricity consumption","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Carbon footprint; Smart grid; Greenhouse gas; Environmental economics; Electricity; Consumption (sociology); Energy consumption; Renewable energy; Energy management; Computer science; Business; Environmental science; Energy (signal processing); Economics; Engineering; Electrical engineering","score_opus":0.010452104902763352,"score_gpt":0.20510994931551724,"score_spread":0.19465784441275388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2549946723","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98296684,0.000048506015,0.00029430707,0.00015608041,0.00093500357,0.00021809491,0.0000024766414,0.0000992253,0.015279461],"genre_scores_gemma":[0.9992056,0.00022235584,0.00003456763,0.00001773343,0.00011233142,0.000040310086,8.295089e-7,0.000027116273,0.0003391908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988788,0.000058618625,0.00029867282,0.00014850486,0.00035286837,0.00026253288],"domain_scores_gemma":[0.9988359,0.00014343033,0.00008964815,0.000869579,0.00003094197,0.000030488407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003912844,0.00017601233,0.000140477,0.000076960074,0.00010201249,0.000031991873,0.00054901367,0.000055914647,0.000025630121],"category_scores_gemma":[0.000028176994,0.00008303348,0.00017708028,0.00023152027,0.0001046672,0.000018596826,0.00018072873,0.00022151151,0.0000014242163],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020388838,0.00022575073,0.022025358,0.00013638279,0.0020534988,0.000004313271,0.00010472819,0.43982047,0.1140963,0.39705068,0.012895821,0.011382835],"study_design_scores_gemma":[0.0005158491,0.00012006217,0.32209894,0.000040810864,0.0001069546,0.0000024975395,0.00003589814,0.03541851,0.6307078,0.00085113884,0.0098189,0.00028265605],"about_ca_topic_score_codex":0.001371311,"about_ca_topic_score_gemma":0.0011713564,"teacher_disagreement_score":0.5166115,"about_ca_system_score_codex":0.00007355202,"about_ca_system_score_gemma":0.00001156282,"threshold_uncertainty_score":0.33860072},"labels":[],"label_agreement":null},{"id":"W2551434836","doi":"10.1109/pesgm.2016.7741490","title":"Power consumption modeling of water pumping system for optimal energy management","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy consumption; Schedule; Reliability (semiconductor); Rotational speed; Automotive engineering; Energy management; Power (physics); Computer science; Reliability engineering; Energy (signal processing); Control theory (sociology); Simulation; Engineering; Control (management); Electrical engineering; Mechanical engineering","score_opus":0.011774552573784788,"score_gpt":0.18988013803933299,"score_spread":0.1781055854655482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2551434836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0772865,0.00002449759,0.9102055,0.000030444158,0.00049491256,0.00011777107,0.0000032773994,0.0003166606,0.011520478],"genre_scores_gemma":[0.9936655,0.000037148773,0.0053313146,0.000011684654,0.00004408477,0.00009469061,0.000004667752,0.000034115776,0.0007767898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922985,0.0000066866264,0.0002497392,0.00015040342,0.00011471047,0.00024860393],"domain_scores_gemma":[0.9996994,0.000013935859,0.000013309007,0.00021155039,0.000028405568,0.000033382905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012775614,0.000119007105,0.00013232604,0.00011827525,0.0000238905,0.00001114436,0.00010480717,0.0000367055,0.00009054893],"category_scores_gemma":[9.445534e-7,0.00007435231,0.000060077913,0.000025655245,0.000009246392,0.000097705364,0.000060066122,0.000012280243,0.000032521035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012906035,0.0000069475122,0.000020997528,0.0003150742,0.0001510922,0.0000017744288,0.000020519823,0.95780945,0.008006094,0.032392897,0.00031860228,0.0009436439],"study_design_scores_gemma":[0.00062105985,0.000016884644,0.000012722528,0.00015131205,0.00003080403,0.0000013922045,0.00007073348,0.9029823,0.08952769,0.000040808438,0.0063655595,0.00017873758],"about_ca_topic_score_codex":0.000005488947,"about_ca_topic_score_gemma":0.0000015836745,"teacher_disagreement_score":0.91637903,"about_ca_system_score_codex":0.00010426737,"about_ca_system_score_gemma":9.1029386e-7,"threshold_uncertainty_score":0.30319995},"labels":[],"label_agreement":null},{"id":"W2553242301","doi":"10.1109/ijcnn.2016.7727545","title":"Whole-house Non-Intrusive Appliance Load Monitoring via multi-label classification","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Classifier (UML); Power consumption; Machine learning; Field (mathematics); Multi-label classification; Energy consumption; Artificial intelligence; Power (physics); Data mining; Engineering","score_opus":0.026254386818977668,"score_gpt":0.23892714347750618,"score_spread":0.21267275665852853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553242301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067662485,0.000075189564,0.9234313,0.0002813255,0.0016208218,0.00023913606,0.0000023273226,0.0015982974,0.005089167],"genre_scores_gemma":[0.9764591,0.00010034012,0.019341227,0.00002695659,0.0004419455,0.00014345972,9.1150577e-7,0.00008855594,0.0033975015],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904686,0.0000072701428,0.00020044869,0.00024757095,0.00020167282,0.00029616363],"domain_scores_gemma":[0.99938637,0.000031744115,0.00002899621,0.0004163724,0.000055404114,0.00008108689],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008604729,0.00017773814,0.00012561357,0.00005873071,0.000046071804,0.000028533068,0.00020620038,0.00006909902,0.000039148978],"category_scores_gemma":[0.000013364695,0.00013917519,0.00003033785,0.0001427911,0.000025336276,0.00022059765,0.000054737047,0.00006880542,0.0018721974],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011402075,0.00008399447,0.005341745,0.0000699242,0.00012103924,0.000010133335,0.00015631458,0.016396997,0.7805463,0.000510805,0.008508999,0.18824233],"study_design_scores_gemma":[0.0029188208,0.00003937164,0.06667011,0.00018082609,0.000040307677,0.0000026208843,0.0001754127,0.64417404,0.22897397,0.000096463824,0.055795796,0.0009322359],"about_ca_topic_score_codex":0.000022403821,"about_ca_topic_score_gemma":0.00001884097,"teacher_disagreement_score":0.9087966,"about_ca_system_score_codex":0.00034514043,"about_ca_system_score_gemma":0.00000811212,"threshold_uncertainty_score":0.99890494},"labels":[],"label_agreement":null},{"id":"W2553616530","doi":"10.1109/pesgm.2016.7741818","title":"Descriptive models for hourly reserve prices in electricity market","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Electricity market; Electricity; Calibration; Econometrics; Market price; Economics; Environmental economics; Natural resource economics; Microeconomics; Electrical engineering; Statistics; Engineering; Mathematics","score_opus":0.02122132792550277,"score_gpt":0.20076745840492444,"score_spread":0.17954613047942167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553616530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1198306,0.00010047774,0.78138053,0.00022731314,0.0002339644,0.0003389486,0.000008257135,0.00034485108,0.097535074],"genre_scores_gemma":[0.9884055,0.00008903899,0.008059781,0.000037321377,0.00006591672,0.00016153303,0.0000012560117,0.000030063184,0.003149592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999302,0.000009499505,0.0001452728,0.00015441299,0.00009606088,0.0002927019],"domain_scores_gemma":[0.99965185,0.00010300778,0.000012253015,0.00016952882,0.000026000635,0.000037381375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021843679,0.000105731924,0.00011119597,0.00014024602,0.000015004068,0.000016227415,0.00015431325,0.000042658616,0.00008292547],"category_scores_gemma":[0.000031553365,0.00007529875,0.0000352391,0.0001775871,0.000008566019,0.00029853728,0.00003233608,0.00003613864,0.000009177769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023562019,0.00011956735,0.0042094593,0.00018492359,0.00026530173,0.000014837017,0.0003827743,0.4957885,0.00640152,0.09625885,0.37380928,0.022329368],"study_design_scores_gemma":[0.0012035648,0.00008254995,0.009680993,0.00005227986,0.000012145728,6.310753e-7,0.00005576478,0.94631034,0.0115949605,0.016486317,0.014149489,0.0003709453],"about_ca_topic_score_codex":0.00012718696,"about_ca_topic_score_gemma":0.00059941754,"teacher_disagreement_score":0.8685749,"about_ca_system_score_codex":0.00018508178,"about_ca_system_score_gemma":0.0000064589776,"threshold_uncertainty_score":0.30705938},"labels":[],"label_agreement":null},{"id":"W2554624099","doi":"10.1109/tia.2016.2626261","title":"Load Aggregation From Generation-Follows-Load to Load-Follows-Generation: Residential Loads","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Demand response; Load management; Load balancing (electrical power); Computer science; Electric power system; Grid; Electricity generation; Load profile; Power (physics); Distributed computing; Control engineering; Electrical engineering; Engineering; Electricity","score_opus":0.02244377912458292,"score_gpt":0.23526217049309534,"score_spread":0.2128183913685124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2554624099","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058467288,0.00007540063,0.9309889,0.0020349992,0.002182544,0.0009475199,0.00032257018,0.00080592505,0.0041748304],"genre_scores_gemma":[0.9816422,0.000084845444,0.0032005426,0.00035733817,0.0024459753,0.003367628,0.0000623564,0.000111983456,0.008727148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9971593,0.00006257889,0.0006533959,0.00074134074,0.00092217664,0.00046120633],"domain_scores_gemma":[0.9979881,0.00010018108,0.0000842044,0.0011745112,0.0003264747,0.00032649672],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0002372794,0.00043091443,0.00027666846,0.00022736476,0.0004909856,0.00015930847,0.00043518847,0.0005371212,0.0013343791],"category_scores_gemma":[0.000016549637,0.00042628954,0.00016839347,0.0008645617,0.00006711315,0.00046882537,0.0000064725755,0.00048349818,0.0015833871],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023608636,0.00018124445,0.000029218585,0.0000105538065,0.00027905006,0.0000044992235,0.00021426128,0.6872353,0.183013,0.00042871613,0.07406396,0.05451662],"study_design_scores_gemma":[0.0021419171,0.00011253979,0.00043208114,0.00012686798,0.00033604857,0.000009600793,0.00009778473,0.032182116,0.58841485,0.00029003317,0.3744309,0.0014252967],"about_ca_topic_score_codex":0.00046176024,"about_ca_topic_score_gemma":0.0019204267,"teacher_disagreement_score":0.9277884,"about_ca_system_score_codex":0.0018220037,"about_ca_system_score_gemma":0.00030643525,"threshold_uncertainty_score":0.9998189},"labels":[],"label_agreement":null},{"id":"W2554827145","doi":"10.1109/epec.2010.5697208","title":"Design of a smart meter techno-economic model for electric utilities in Ontario","year":2010,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Queen's University","funders":"","keywords":"Revenue; Profit (economics); Smart meter; Energy consumption; Computer science; Environmental economics; Smart grid; Engineering; Business; Electrical engineering; Economics","score_opus":0.02057360935713679,"score_gpt":0.19112657564258262,"score_spread":0.17055296628544583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2554827145","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46996498,0.000009295989,0.5233982,0.000013684495,0.00021487498,0.00027127942,8.4554625e-7,0.00013719485,0.005989649],"genre_scores_gemma":[0.9656865,0.0000026797816,0.03206875,0.000013053652,0.000011322534,0.00014809493,0.0000012780836,0.00002104255,0.0020472836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948233,0.000002445674,0.00018236112,0.000107537104,0.000037686892,0.00018763544],"domain_scores_gemma":[0.99972427,0.000040302188,0.000012406093,0.0001967737,0.000008001911,0.000018257144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015015155,0.00009563728,0.00013560965,0.00020200654,0.000008183704,0.0000082234255,0.00012327863,0.00005849652,0.00010214608],"category_scores_gemma":[0.0000051953784,0.00009704053,0.000034409954,0.000048989175,0.000009069231,0.00007631039,0.000019150684,0.000109569126,0.0000068837107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011254126,0.000009207771,0.0004557977,0.000015757385,0.000023563287,1.5758864e-7,0.000095303316,0.98464787,0.009790473,0.003887377,0.00068030384,0.00038294884],"study_design_scores_gemma":[0.00021766077,0.00002351509,0.00040700723,0.0000022382205,0.000007558004,3.706496e-7,0.000008369184,0.97202927,0.024935072,0.0016458946,0.0006213267,0.00010169808],"about_ca_topic_score_codex":0.0060205925,"about_ca_topic_score_gemma":0.14416578,"teacher_disagreement_score":0.49572152,"about_ca_system_score_codex":0.00013929157,"about_ca_system_score_gemma":0.00003575981,"threshold_uncertainty_score":0.91013753},"labels":[],"label_agreement":null},{"id":"W2555580606","doi":"10.1109/pesgm.2016.7741187","title":"Whether to charge an electric vehicle or not? A near-optimal online approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates - Technology Futures","keywords":"Computer science; Online algorithm; A priori and a posteriori; Competitive analysis; Markov decision process; Scheduling (production processes); Electric vehicle; Smart grid; Electricity; Job shop scheduling; Markov process; Markov chain; Grid; Mathematical optimization; Upper and lower bounds; Operations research; Real-time computing; Schedule; Engineering; Algorithm","score_opus":0.018155657407041607,"score_gpt":0.22103802159958827,"score_spread":0.20288236419254665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555580606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8894427,0.000013865603,0.095047,0.0004349415,0.00022318664,0.00023815595,0.000007490099,0.0010091428,0.013583511],"genre_scores_gemma":[0.96325517,0.000015721827,0.023435995,0.0004884817,0.00029113342,0.000062489904,0.000006926107,0.000084153435,0.012359932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903464,0.000015262725,0.00015141147,0.00024404693,0.00016431411,0.00039030885],"domain_scores_gemma":[0.9994327,0.000019191013,0.000009352791,0.0003681934,0.000020013318,0.00015059373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102158934,0.00016113749,0.00013754643,0.00009456899,0.000034473156,0.000037754606,0.00021687832,0.000052611507,0.0009098932],"category_scores_gemma":[0.000014420997,0.000100600904,0.00003376055,0.00031171407,0.0000086633045,0.00016396391,0.00005319551,0.000060642957,0.000582484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005228202,0.0008670305,0.0012017225,0.00010667965,0.0003545407,0.000029534476,0.0006702128,0.5993771,0.22928202,0.006905604,0.072155386,0.08852732],"study_design_scores_gemma":[0.0010271418,0.0002710063,0.005299415,0.000013827261,0.000019669613,0.0000042566357,0.000044832283,0.8770205,0.01743197,0.0000063999532,0.09831608,0.00054495287],"about_ca_topic_score_codex":0.000028978566,"about_ca_topic_score_gemma":0.000024725505,"teacher_disagreement_score":0.27764332,"about_ca_system_score_codex":0.0000817303,"about_ca_system_score_gemma":0.000010406339,"threshold_uncertainty_score":0.9962693},"labels":[],"label_agreement":null},{"id":"W2555964569","doi":"10.5547/01956574.38.5.cwoo","title":"Winter Residential Optional Dynamic Pricing: British Columbia.","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agricultural economics; Environmental science; Geography; Business; Meteorology; Economics; Demography","score_opus":0.0041031124830723876,"score_gpt":0.1754397417552786,"score_spread":0.17133662927220622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555964569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7255269,0.00088659354,0.24952672,0.0018085258,0.006778907,0.000069202964,0.000008366477,0.00041172,0.014983009],"genre_scores_gemma":[0.98108596,0.0003845748,0.00023993388,0.00010892153,0.0010277664,0.000008029161,0.0000016223279,0.000043024385,0.017100144],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99899274,0.0000487196,0.00024784275,0.0001108837,0.00029847655,0.00030134578],"domain_scores_gemma":[0.99959373,0.000040480172,0.000045437922,0.00019311484,0.00004210355,0.00008513598],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024843286,0.00009313223,0.00010788904,0.00004644697,0.00019831717,0.000348,0.0003499913,0.000043160057,0.0012256129],"category_scores_gemma":[0.000017944023,0.00008283646,0.00009359202,0.000090103014,0.000057203775,0.00019284163,0.000078763944,0.00013856581,0.000043405642],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026658503,0.000054603734,0.0028727967,0.000013860904,0.0007065889,0.00038929153,0.00009450754,0.24340566,0.010904904,0.0012594901,0.65038764,0.08988402],"study_design_scores_gemma":[0.004160091,0.00017761631,0.23600182,0.0008140262,0.00020915907,0.007055673,0.00015917959,0.02367977,0.0014008449,0.017290553,0.7076117,0.0014395905],"about_ca_topic_score_codex":0.00018947817,"about_ca_topic_score_gemma":0.008735473,"teacher_disagreement_score":0.25555903,"about_ca_system_score_codex":0.0001831804,"about_ca_system_score_gemma":0.000017634218,"threshold_uncertainty_score":0.9996874},"labels":[],"label_agreement":null},{"id":"W2558178876","doi":"10.1109/tsg.2016.2633280","title":"Considering Thermodynamic Characteristics of a CAES Facility in Self-Scheduling in Energy and Reserve Markets","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Compressed air energy storage; Electricity; Scheduling (production processes); Energy storage; Spinning; Revenue; Environmental science; Computer science; Engineering; Thermodynamics; Physics; Economics; Mechanical engineering; Electrical engineering; Operations management; Finance; Power (physics)","score_opus":0.009166326696854493,"score_gpt":0.1906162705339844,"score_spread":0.1814499438371299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2558178876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9099074,0.000046457215,0.088756904,0.000060722257,0.000651397,0.00009800958,0.00006801922,0.0001242544,0.00028685067],"genre_scores_gemma":[0.99878246,0.00064184074,0.0004277878,0.000014139399,0.000023866822,0.00005717883,0.0000019938993,0.000023872644,0.000026859474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887806,0.00006476679,0.00041496163,0.0002397488,0.00013732571,0.0002651495],"domain_scores_gemma":[0.9994209,0.00019004101,0.000035902754,0.00027615324,0.000020839185,0.00005620647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024658756,0.00018721266,0.00027296532,0.00032178487,0.000027648053,0.000009383008,0.0000963226,0.00008795966,0.000038983766],"category_scores_gemma":[0.000008857047,0.00016997578,0.00004776829,0.0002083806,0.000046798217,0.00014473413,0.0000035745206,0.0001227862,0.0000034288394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052227225,0.00073356595,0.05246487,0.0009644769,0.0005231678,0.00017327166,0.0017128744,0.7533498,0.09117461,0.00029718352,0.000091879214,0.09799207],"study_design_scores_gemma":[0.0042240783,0.00016445007,0.33245403,0.0010037572,0.000082716775,0.000025761758,0.00026178578,0.5904525,0.06627091,0.00023668163,0.0035752954,0.0012480327],"about_ca_topic_score_codex":0.00026216902,"about_ca_topic_score_gemma":0.0023220729,"teacher_disagreement_score":0.27998915,"about_ca_system_score_codex":0.00016169931,"about_ca_system_score_gemma":0.000015970993,"threshold_uncertainty_score":0.6931411},"labels":[],"label_agreement":null},{"id":"W2558502882","doi":"10.1109/isie.2016.7744972","title":"Active power load modeling based on uncertainties for Non Intrusive Load Monitoring","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Fondation de l’UQTR","keywords":"Computer science; Probabilistic logic; Cluster analysis; Power (physics); Variance (accounting); Electric power system; Subtractive color; Resistive touchscreen; Data mining; Machine learning; Artificial intelligence","score_opus":0.01271972404768009,"score_gpt":0.22111696988641347,"score_spread":0.20839724583873337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2558502882","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15524125,0.000024109704,0.80306226,0.00030493893,0.0021829891,0.000367517,0.000008678548,0.0005443772,0.038263887],"genre_scores_gemma":[0.99598473,0.000012161093,0.0027048818,0.000058727626,0.00027621735,0.00013956711,0.0000011872875,0.000051966992,0.0007705414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902177,0.000006709451,0.00015983272,0.00023071445,0.00026875729,0.00031222717],"domain_scores_gemma":[0.9993924,0.000121181605,0.000018845523,0.00028001273,0.00012768598,0.000059859132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000112503214,0.00020074031,0.00015237904,0.000092415175,0.00005199496,0.000027179623,0.00014395914,0.0000639347,0.000073447736],"category_scores_gemma":[0.000062606145,0.00014695982,0.000075614575,0.000081302445,0.000013697819,0.00016111073,0.000034663768,0.000059848775,0.000057293288],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007388827,0.00001270993,0.000054667362,0.000021776015,0.000058037953,0.000001534668,0.00010672164,0.9896384,0.0029554649,0.00062219606,0.0009688104,0.005485783],"study_design_scores_gemma":[0.0008721522,0.00008288008,0.00011207408,0.00013668089,0.000015803744,1.2483595e-7,0.000254569,0.9364292,0.05802744,0.00022791928,0.00355408,0.00028706546],"about_ca_topic_score_codex":0.000047297843,"about_ca_topic_score_gemma":0.000014267968,"teacher_disagreement_score":0.8407435,"about_ca_system_score_codex":0.0008386733,"about_ca_system_score_gemma":0.000035108485,"threshold_uncertainty_score":0.59928477},"labels":[],"label_agreement":null},{"id":"W2559146925","doi":"10.1109/isie.2016.7744974","title":"Development of real-time admittance analysis system for residential load monitoring","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Admittance; Computer science; Real-time computing; Environmental science; Engineering; Electrical engineering; Electrical impedance","score_opus":0.010619588854016626,"score_gpt":0.21646713827581748,"score_spread":0.20584754942180086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559146925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58653986,0.00005145164,0.3978818,0.000017226219,0.00077855936,0.00020191271,0.0000049145783,0.0006089291,0.013915345],"genre_scores_gemma":[0.94958454,0.00001664081,0.0478605,4.8145154e-7,0.00014493661,0.00006981121,0.0000015721586,0.000022888304,0.0022986338],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990802,0.000006745794,0.00033469993,0.00015696557,0.00022110304,0.00020030151],"domain_scores_gemma":[0.9995414,0.00004706613,0.000040690178,0.00025731436,0.000066023014,0.000047507645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021065527,0.00011116905,0.0002172193,0.0001512406,0.00003077054,0.000010377103,0.00014516713,0.000035727782,0.00004554779],"category_scores_gemma":[0.000011451255,0.00008499802,0.00008795856,0.00026480015,0.0000074658215,0.00007958047,0.000037767928,0.000012890532,0.00004092418],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001017978,0.000051161893,0.013133425,0.0012538249,0.008138911,0.00001068106,0.0006666231,0.21476282,0.7268851,0.0038162295,0.006282067,0.024897397],"study_design_scores_gemma":[0.0008135719,0.000016410311,0.028697692,0.00024605697,0.00046421503,4.79945e-7,0.00017596406,0.016424935,0.94448775,0.000009492593,0.008239965,0.00042349347],"about_ca_topic_score_codex":0.000022040798,"about_ca_topic_score_gemma":0.00004427856,"teacher_disagreement_score":0.36304468,"about_ca_system_score_codex":0.00034567702,"about_ca_system_score_gemma":0.000021777529,"threshold_uncertainty_score":0.34661186},"labels":[],"label_agreement":null},{"id":"W2560424504","doi":"10.1109/epec.2016.7771719","title":"Dynamic threshold algorithm with simplified appliance identification for smart meter privacy","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Smart meter; Identification (biology); Computer science; Smart grid; Compensation (psychology); Metre; Key (lock); Algorithm; Differential privacy; Information privacy; Real-time computing; Data mining; Computer security; Engineering; Electrical engineering","score_opus":0.009908898596534379,"score_gpt":0.21549266893161576,"score_spread":0.20558377033508138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2560424504","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015122194,0.000025159194,0.9808604,0.00024797552,0.00027598764,0.00040887942,0.000010108632,0.00048165143,0.0025676445],"genre_scores_gemma":[0.93969524,0.000030145853,0.05171942,0.00007838442,0.000072873925,0.00057549076,0.00002135508,0.00007283147,0.0077342344],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920326,0.000003318694,0.00017979127,0.00023689536,0.00013096558,0.0002457461],"domain_scores_gemma":[0.9994305,0.000037368234,0.00002516826,0.0004260735,0.000034667668,0.00004627143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010292956,0.00014567682,0.0001152529,0.00006427407,0.000036335994,0.000036635207,0.0001897744,0.00003869378,0.000052454965],"category_scores_gemma":[0.000005229581,0.00009492386,0.000037167523,0.00010441315,0.00002099491,0.00018809125,0.00003076701,0.000029034034,0.000105707746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001238054,0.00017555525,0.0017508741,0.000512193,0.0011924244,0.000011916342,0.00017725272,0.094233066,0.14170521,0.02680891,0.07079539,0.6625134],"study_design_scores_gemma":[0.0023610475,0.000096936,0.011709437,0.000079158955,0.00009885634,0.000005148809,0.000037861,0.791858,0.060481817,0.0031179856,0.12927315,0.0008805686],"about_ca_topic_score_codex":0.0000029116782,"about_ca_topic_score_gemma":0.000016270877,"teacher_disagreement_score":0.929141,"about_ca_system_score_codex":0.0000920204,"about_ca_system_score_gemma":0.0000043753353,"threshold_uncertainty_score":0.38708827},"labels":[],"label_agreement":null},{"id":"W2560764283","doi":"10.1109/epec.2016.7771763","title":"Non-intrusive load monitoring using wavelet design and co-testing of machine learning classifiers","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; Wavelet; Load testing; Artificial intelligence; Machine learning; Pattern recognition (psychology)","score_opus":0.03379480620719277,"score_gpt":0.23300637679779165,"score_spread":0.19921157059059888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2560764283","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.561965,0.0000845482,0.4334783,0.000013629522,0.0002688375,0.000102119586,7.121168e-7,0.00020319893,0.0038836878],"genre_scores_gemma":[0.9420206,0.00005291503,0.057558145,0.0000039493107,0.00011823279,0.000005167487,3.4712312e-7,0.000040373037,0.00020026224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991574,0.000023205408,0.00021415348,0.0001693855,0.00017295986,0.00026284042],"domain_scores_gemma":[0.9994876,0.00021420437,0.00004670575,0.00013564414,0.000047774523,0.00006810243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025301334,0.00015905208,0.00017989396,0.000101020705,0.00006214261,0.000019585688,0.00008427872,0.000049623526,0.000029650553],"category_scores_gemma":[0.000097465476,0.00012512653,0.000023486431,0.00013878797,0.00004010609,0.00014298133,0.00005972636,0.00009319466,0.0000068443624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012148877,0.000006873613,0.046248402,0.00008475087,0.0001100645,0.0000147737155,0.00016840776,0.6313311,0.29864648,0.00007221852,0.00010997004,0.023194816],"study_design_scores_gemma":[0.0005096896,0.000045086148,0.0041232677,0.00018565933,0.000026273718,0.0000070988276,0.00009727369,0.80520695,0.18903051,0.000027476492,0.0005043798,0.00023630902],"about_ca_topic_score_codex":0.00008304215,"about_ca_topic_score_gemma":0.0000015983202,"teacher_disagreement_score":0.38005564,"about_ca_system_score_codex":0.00016089207,"about_ca_system_score_gemma":0.000014653304,"threshold_uncertainty_score":0.51025116},"labels":[],"label_agreement":null},{"id":"W2561332322","doi":"10.1109/smartgridcomm.2016.7778755","title":"EV-assisted battery load hiding: A Markov decision process approach","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Markov decision process; Computer science; Microgrid; Benchmark (surveying); Battery (electricity); Electricity; Energy consumption; Demand response; Process (computing); Markov process; Partially observable Markov decision process; Real-time computing; Markov chain; Markov model; Control (management); Artificial intelligence; Machine learning; Engineering; Power (physics)","score_opus":0.011353702362403857,"score_gpt":0.20797243071598406,"score_spread":0.1966187283535802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561332322","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16293606,0.000095630996,0.6096707,0.00019707474,0.0007855827,0.00020090998,0.0000018335596,0.0011868506,0.22492538],"genre_scores_gemma":[0.9888028,0.000026307902,0.0076073846,0.00008344432,0.00014976125,0.00007556425,0.0000024312337,0.000050664312,0.0032016446],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887943,0.000011264046,0.000218473,0.00026449427,0.00032206046,0.0003042771],"domain_scores_gemma":[0.99940336,0.000073716226,0.000018509852,0.00037316958,0.000042700944,0.00008853876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017441412,0.00018157602,0.00015281822,0.0001069274,0.000035709294,0.000038592672,0.00024613523,0.00006576461,0.0003348902],"category_scores_gemma":[0.000041767948,0.00011896829,0.00005215791,0.00021714969,0.000018899853,0.00019779388,0.00005235661,0.000053869702,0.0002137139],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119663855,0.00028974283,0.008395671,0.00055773824,0.00042532862,0.00005268862,0.0002614415,0.07618437,0.02130921,0.0022349993,0.31823885,0.5719303],"study_design_scores_gemma":[0.009652088,0.00022954699,0.15852308,0.0011908776,0.00025211915,0.00014629646,0.0006447588,0.41270378,0.08248329,0.0027083214,0.3267809,0.0046849544],"about_ca_topic_score_codex":0.000004082113,"about_ca_topic_score_gemma":0.00000530897,"teacher_disagreement_score":0.82586676,"about_ca_system_score_codex":0.00019829435,"about_ca_system_score_gemma":0.000014108398,"threshold_uncertainty_score":0.4851386},"labels":[],"label_agreement":null},{"id":"W2561560843","doi":"10.1109/appeec.2016.7779872","title":"Connectivity for Home Energy Management applications","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Interoperability; Smart grid; Ethernet; Default gateway; Computer science; Wireless; Energy management; Computer network; Energy management system; Embedded system; Communications protocol; Telecommunications; Engineering; Energy (signal processing); Operating system; Electrical engineering","score_opus":0.005782952042238004,"score_gpt":0.18151547326965906,"score_spread":0.17573252122742106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561560843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00072187587,0.000024231185,0.93084615,0.00021332846,0.00020570682,0.0001839012,0.000007480802,0.0005333168,0.067263976],"genre_scores_gemma":[0.9814807,0.00009979935,0.0066148993,0.000114222086,0.00017184115,0.001971251,0.0000062472104,0.00003529171,0.009505723],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995317,0.0000033880428,0.000089813264,0.00014029934,0.00006208648,0.00017271333],"domain_scores_gemma":[0.99963003,0.000051590763,0.00000766773,0.00025884266,0.000012770002,0.00003909921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000051567957,0.00008540776,0.000071077964,0.00006435935,0.000031087144,0.000010394629,0.00011298681,0.000021753658,0.00010474899],"category_scores_gemma":[0.000001248973,0.000062823354,0.000038047394,0.00007928618,0.000011318539,0.00006301269,0.000037475198,0.000008852405,0.000043736374],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030069625,0.00002135375,0.00007349685,0.00004327644,0.00011985432,6.122203e-7,0.0000028992042,0.0068132738,0.0007711054,0.807403,0.032851472,0.15189663],"study_design_scores_gemma":[0.0004261039,0.000010388443,0.0015702595,0.0000060514844,0.000016333473,3.943878e-7,0.000007291852,0.004238888,0.0038835227,0.0068988036,0.98277247,0.00016947936],"about_ca_topic_score_codex":0.0000048450183,"about_ca_topic_score_gemma":0.000022396143,"teacher_disagreement_score":0.98075885,"about_ca_system_score_codex":0.00006671863,"about_ca_system_score_gemma":0.0000011333492,"threshold_uncertainty_score":0.2561862},"labels":[],"label_agreement":null},{"id":"W2564594983","doi":"10.1109/cisis.2016.125","title":"Heuristic Algorithm Based Energy Management System in Smart Grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Dalhousie University","funders":"","keywords":"Computer science; Heuristic; Smart grid; Energy management; Energy management system; Meta heuristic; Algorithm; Energy (signal processing); Distributed computing; Artificial intelligence; Engineering; Mathematics; Electrical engineering","score_opus":0.0040959453519711225,"score_gpt":0.15855002806655186,"score_spread":0.15445408271458072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564594983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00066884304,0.0000685238,0.8881388,0.00009592967,0.0018083829,0.00012052056,0.0000062306194,0.0009862768,0.10810654],"genre_scores_gemma":[0.97621995,0.00007731772,0.017701467,0.00017257214,0.00029546075,0.0002540004,0.000012537521,0.000088822504,0.0051778974],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888337,0.000025206691,0.00027311718,0.0002440418,0.00021189965,0.00036238396],"domain_scores_gemma":[0.99945354,0.00004382113,0.000015744883,0.00039809942,0.000012141436,0.00007664923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014369554,0.00019236603,0.00017067371,0.0002728289,0.000019981673,0.000020656249,0.00019971126,0.00004479833,0.00016044796],"category_scores_gemma":[0.0000026889327,0.00014459688,0.00004728576,0.00023139149,0.000014675337,0.00007676399,0.00006436175,0.000034405835,0.00019628645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020663261,0.00014785951,0.002100271,0.0008690654,0.00035761177,0.0010236955,0.000020935991,0.28803337,0.00032665354,0.121713966,0.104684696,0.4807012],"study_design_scores_gemma":[0.0016391638,0.000029046303,0.006435543,0.00030905218,0.00003088608,0.0000044432645,0.000049676008,0.5923948,0.002059132,0.00008294918,0.39642295,0.00054235343],"about_ca_topic_score_codex":0.00008856775,"about_ca_topic_score_gemma":0.00007936497,"teacher_disagreement_score":0.97555107,"about_ca_system_score_codex":0.00035157133,"about_ca_system_score_gemma":0.00000398809,"threshold_uncertainty_score":0.58964896},"labels":[],"label_agreement":null},{"id":"W2564616218","doi":"10.1007/s40565-016-0255-y","title":"Hierarchical and distributed demand response control strategy for thermostatically controlled appliances in smart grid","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Engineering and Physical Sciences Research Council; State Grid Corporation of China; National Natural Science Foundation of China","keywords":"Demand response; Control (management); Smart grid; Frequency regulation; Renewable energy; Grid; Computer science; Feature (linguistics); Power (physics); Engineering; Control engineering; Electric power system; Electricity; Artificial intelligence","score_opus":0.00854508436138541,"score_gpt":0.21100375311103275,"score_spread":0.20245866874964735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564616218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26607558,0.0021280062,0.73068714,0.00031697899,0.00041954595,0.00017295418,0.000039258597,0.000020641255,0.00013985994],"genre_scores_gemma":[0.9993307,0.00030042155,0.0000611355,0.00004103565,0.00011748646,0.000036969413,0.0000010641196,0.000027544113,0.00008364658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862236,0.00014815887,0.00063291186,0.00014436195,0.00018779839,0.00026443115],"domain_scores_gemma":[0.99895376,0.0005731086,0.00013908492,0.00011356852,0.00006921491,0.00015126419],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008617206,0.00017959347,0.0005592984,0.00011921196,0.000035636956,0.00006733885,0.00010573942,0.0000813018,0.0000040762825],"category_scores_gemma":[0.00006580476,0.00011152551,0.00007396827,0.000048672246,0.00005808421,0.00013328073,0.000016442471,0.00008151659,2.3893935e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.035138015,0.0002711936,0.0032609468,0.00033399634,0.0020977098,0.0004370403,0.00051481574,0.8417286,0.020216718,0.03517451,0.0067519536,0.05407446],"study_design_scores_gemma":[0.07477284,0.0025937634,0.037971947,0.001154889,0.0002699133,0.0004534136,0.0007716197,0.8200816,0.00049041375,0.006918886,0.053406514,0.0011142124],"about_ca_topic_score_codex":0.000010237363,"about_ca_topic_score_gemma":0.000036262747,"teacher_disagreement_score":0.7332551,"about_ca_system_score_codex":0.000055773602,"about_ca_system_score_gemma":0.00002458741,"threshold_uncertainty_score":0.45478782},"labels":[],"label_agreement":null},{"id":"W2564673630","doi":"10.1109/tsg.2016.2643700","title":"Non-Intrusive Energy Use Monitoring for a Group of Electrical Appliances","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"State Grid Corporation of China; China Scholarship Council; China Postdoctoral Science Foundation; University of Alberta","keywords":"Energy (signal processing); Energy consumption; Bernoulli's principle; Electric potential energy; Event (particle physics); Power (physics); Engineering; Reliability engineering; Automotive engineering; Simulation; Computer science; Real-time computing; Electrical engineering; Statistics; Mathematics","score_opus":0.014611465036742604,"score_gpt":0.2143287983958291,"score_spread":0.1997173333590865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564673630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042988684,0.00003424393,0.9526188,0.00004402891,0.003633184,0.00019529731,0.00004738118,0.00022533543,0.00021307937],"genre_scores_gemma":[0.9957715,0.0003204307,0.0024866129,0.000019949612,0.00048670318,0.00046878197,0.0000018560771,0.000059570964,0.00038456928],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99890655,0.000011599264,0.00028882863,0.00025067263,0.00019685112,0.00034550484],"domain_scores_gemma":[0.9992961,0.00022919526,0.00003812413,0.0002993211,0.000050021008,0.00008719795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000706245,0.00021080198,0.0002395404,0.00021143396,0.0000757765,0.000019785064,0.00016579102,0.00008791648,0.000025666097],"category_scores_gemma":[0.0000036292654,0.00017442349,0.00016007123,0.00026172178,0.0000389838,0.00023060509,0.0000013176561,0.000081235296,0.000016748872],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005049098,0.0004965025,0.001076732,0.00022600463,0.0011260026,0.000014200978,0.00017423702,0.56051916,0.21040179,0.0014914994,0.009916271,0.2140527],"study_design_scores_gemma":[0.0016337386,0.00035940798,0.0014913151,0.00016490319,0.00012402743,0.000004679903,0.000023193514,0.022214932,0.90955895,0.0001068338,0.06378073,0.0005372668],"about_ca_topic_score_codex":0.00006221019,"about_ca_topic_score_gemma":0.00004353803,"teacher_disagreement_score":0.95278287,"about_ca_system_score_codex":0.00013641734,"about_ca_system_score_gemma":0.000010163395,"threshold_uncertainty_score":0.7112783},"labels":[],"label_agreement":null},{"id":"W2568301553","doi":"10.1109/jiot.2016.2647625","title":"Dynamic Load Balancing Applying Water-Filling Approach in Smart Grid Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ryerson University","keywords":"Computer science; Smart grid; Load balancing (electrical power); Dynamic demand; Demand response; Distributed computing; Grid; Scheduling (production processes); Electric power system; Power (physics); Load management; Reliability (semiconductor); Context (archaeology); Reliability engineering; Real-time computing; Mathematical optimization; Electricity; Engineering; Electrical engineering","score_opus":0.011086792945396506,"score_gpt":0.21435808274625817,"score_spread":0.20327128980086168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2568301553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8627878,0.00039414832,0.115219034,0.00003524042,0.009676652,0.00019797622,0.0000011925033,0.00011738878,0.011570604],"genre_scores_gemma":[0.9970864,0.00008152302,0.002095092,0.000016682334,0.00032724687,0.000022683824,0.0000023164328,0.00005834319,0.00030971388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981346,0.000035683453,0.00068268104,0.0002093901,0.0004498058,0.0004878211],"domain_scores_gemma":[0.99914896,0.000023634437,0.00023374427,0.00042180493,0.00007150602,0.000100348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012328526,0.00024600257,0.0004021433,0.00025739503,0.000119777236,0.00044878313,0.00092363375,0.00010383162,0.000014896683],"category_scores_gemma":[0.000033214437,0.00020869786,0.00012373707,0.000041201496,0.000045120352,0.0007284278,0.0001371461,0.0006425952,0.00002118093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023873574,0.000038966096,0.005299061,0.00045207838,0.00022666379,0.00012484546,0.0023919223,0.9705474,0.018034678,0.00006022823,0.0011581917,0.0016421376],"study_design_scores_gemma":[0.0006053452,0.000026988084,0.0012887103,0.00082269777,0.000026692702,0.00025058267,0.00026979094,0.9870966,0.0073008533,0.00005490371,0.0019611681,0.00029563057],"about_ca_topic_score_codex":0.000512787,"about_ca_topic_score_gemma":0.000018933608,"teacher_disagreement_score":0.13429864,"about_ca_system_score_codex":0.00051422045,"about_ca_system_score_gemma":0.000014554449,"threshold_uncertainty_score":0.8510452},"labels":[],"label_agreement":null},{"id":"W2568495984","doi":"10.1049/iet-gtd.2016.0231","title":"Optimal scheduling of independently operated, locally controlled energy storage systems as dispatchable assets in a competitive electricity market","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dispatchable generation; Electricity market; Electricity; Energy storage; Scheduling (production processes); Computer science; Industrial organization; Business; Operations management; Renewable energy; Distributed generation; Electrical engineering; Economics; Engineering","score_opus":0.008859297620424193,"score_gpt":0.22093851760281308,"score_spread":0.21207921998238888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2568495984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30795863,0.0004786697,0.6888183,0.00009444849,0.00051922054,0.00039813534,0.000073721916,0.000099442004,0.001559482],"genre_scores_gemma":[0.9978554,0.0004239324,0.00038094804,0.00001244289,0.00015037044,0.00015282271,0.000719745,0.000032766002,0.00027153917],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99795395,0.0001868451,0.0006744008,0.00035467205,0.00046588393,0.00036427326],"domain_scores_gemma":[0.9990395,0.00004029018,0.00019168678,0.0003913192,0.0002028936,0.00013434167],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006281146,0.00029246145,0.0005101975,0.00013470605,0.00027938344,0.00023910127,0.00029340683,0.0002148183,0.00010571802],"category_scores_gemma":[0.00007104269,0.00029143516,0.00011120665,0.00018955655,0.000042775144,0.00043777892,0.00003104286,0.00020826107,0.0000057067514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028623216,0.000116205956,0.00030507968,0.00006564188,0.00008903226,0.000020942052,0.00003668943,0.9539237,0.03920245,0.0042481003,0.0007568056,0.00094913214],"study_design_scores_gemma":[0.004109002,0.00009086223,0.002518223,0.00014707362,0.000043523356,0.000004865671,0.000046247016,0.94880706,0.041080717,0.000013696908,0.0028532702,0.00028543832],"about_ca_topic_score_codex":0.0005554574,"about_ca_topic_score_gemma":0.00012190852,"teacher_disagreement_score":0.6898968,"about_ca_system_score_codex":0.00033703278,"about_ca_system_score_gemma":0.00008836413,"threshold_uncertainty_score":0.9999538},"labels":[],"label_agreement":null},{"id":"W2570059685","doi":"10.1063/1.4973713","title":"Economically efficient and environment friendly energy management in rural area","year":2017,"lang":"en","type":"article","venue":"Journal of Renewable and Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Electricity; Biogas; Environmental pollution; Electricity generation; Environmental economics; Multi-objective optimization; Computer science; Environmental science; Business; Engineering; Waste management; Mathematical optimization; Mathematics; Economics; Environmental protection","score_opus":0.0034543187497351265,"score_gpt":0.16959690325852894,"score_spread":0.16614258450879382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2570059685","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90099585,0.0062688426,0.0418739,0.0006005379,0.00068527,0.00012217391,0.000001800715,0.00004568947,0.049405914],"genre_scores_gemma":[0.98462635,0.009719667,0.0006566167,0.00004831993,0.000116328774,0.000013239305,0.0000013466869,0.000029417333,0.0047887056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99872375,0.000021331867,0.00042290357,0.00016603486,0.00017211064,0.00049385807],"domain_scores_gemma":[0.9992855,0.000024339237,0.0001660543,0.00032948042,0.0000268777,0.00016774372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000348404,0.00021071969,0.00032583828,0.00031789197,0.00019136062,0.00020421947,0.0002747147,0.00007029543,0.000026989484],"category_scores_gemma":[0.000010508308,0.00019838268,0.00005758042,0.000044851597,0.00007398366,0.0002788538,0.00030340347,0.000085074666,4.1300208e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045093377,0.000045996996,0.00059252046,0.000071158465,0.00014007391,0.0005464812,0.000044765362,0.9655451,0.00010474296,0.016589515,0.0017487891,0.014525718],"study_design_scores_gemma":[0.004182855,0.00038906295,0.009912752,0.00017181782,0.0001371188,0.00014956361,0.004115029,0.2002192,0.0024087385,0.0075694374,0.7699135,0.00083094434],"about_ca_topic_score_codex":0.0008001168,"about_ca_topic_score_gemma":0.00009467334,"teacher_disagreement_score":0.7681647,"about_ca_system_score_codex":0.00026163965,"about_ca_system_score_gemma":0.000016957918,"threshold_uncertainty_score":0.8089811},"labels":[],"label_agreement":null},{"id":"W2570248682","doi":"10.1109/cdc.2016.7798912","title":"An outer approximation of the Minkowski sum of convex conic sets with application to demand response","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Mathematical optimization; Operator (biology); Scheduling (production processes); Conic section; Regular polygon; Computation; Conic optimization; Quadratic equation; Minkowski addition; Computer science; Minkowski space; Mathematics; Convex optimization; Convex combination; Algorithm","score_opus":0.004979287919248975,"score_gpt":0.19893622258122085,"score_spread":0.19395693466197186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2570248682","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68820906,0.000003819314,0.31037134,0.0002588379,0.00003994439,0.0002197129,0.0000027245521,0.000045182318,0.0008493395],"genre_scores_gemma":[0.99786156,0.0000014594314,0.0018111053,0.000039979524,0.00001062956,0.000047263362,0.0000013964454,0.000012636433,0.00021399098],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99954194,0.000030027244,0.00013917642,0.000091414855,0.00011640953,0.0000810261],"domain_scores_gemma":[0.9994805,0.0000428408,0.0000319399,0.00038093244,0.000037358328,0.000026437892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019837185,0.00006479229,0.000084513566,0.00004695805,0.000009759777,0.000003748342,0.00012706575,0.000024681745,0.000021885226],"category_scores_gemma":[0.000009253094,0.00003424586,0.0000149938405,0.0001061818,0.000025421941,0.000072299226,0.000020889487,0.000015008026,0.000009002251],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005968702,0.000090659334,0.011533504,0.00018498074,0.0001505826,5.9993766e-7,0.0008931828,0.2448291,0.71806043,0.011349527,0.003102512,0.009208063],"study_design_scores_gemma":[0.0010960985,0.00020344817,0.17026094,0.000092460265,0.000040977815,0.000002321079,0.00013146625,0.078982845,0.74247164,0.00018844823,0.0062898966,0.00023947522],"about_ca_topic_score_codex":0.0000095958,"about_ca_topic_score_gemma":0.000036402707,"teacher_disagreement_score":0.30965245,"about_ca_system_score_codex":0.00003008043,"about_ca_system_score_gemma":0.0000066779676,"threshold_uncertainty_score":0.13965055},"labels":[],"label_agreement":null},{"id":"W2571230811","doi":"10.1109/tsg.2017.2648509","title":"Volt-VAR Control Through Joint Optimization of Capacitor Bank Switching, Renewable Energy, and Home Appliances","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Load shifting; Renewable energy; AC power; Voltage drop; Smart grid; Computer science; Voltage reduction; Energy storage; Voltage; Capacitor; Automotive engineering; Electrical engineering; Power (physics); Engineering; Electricity","score_opus":0.01388021243448951,"score_gpt":0.20454362952251065,"score_spread":0.19066341708802115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2571230811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005729248,0.00013917529,0.98655593,0.00012045658,0.0039067375,0.0001640283,0.000051622657,0.00021536353,0.0031174228],"genre_scores_gemma":[0.9927847,0.0005868026,0.005673129,0.00006266139,0.00033508622,0.00011076071,0.000004568215,0.000056649245,0.00038567983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988401,0.000024687632,0.00033856285,0.00028515622,0.00023251743,0.0002789932],"domain_scores_gemma":[0.9990765,0.000038066086,0.00011338193,0.0006404484,0.00005037263,0.000081221035],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013142606,0.0002523264,0.00033867042,0.00011904591,0.00036408377,0.00009749067,0.00022502792,0.00010703552,0.00008613594],"category_scores_gemma":[0.000004326123,0.0002581846,0.00009981011,0.000083629355,0.00009242664,0.00046861815,0.0000030005656,0.00012734254,0.0000068707154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002581151,0.000046239304,0.00005962955,0.00006772794,0.00015788112,0.000002807839,0.00009809957,0.99351645,0.0024982453,0.00009002562,0.002038501,0.0013986013],"study_design_scores_gemma":[0.0022854835,0.00017143233,0.00076426065,0.00017078874,0.00021469548,0.000010265806,0.000089458736,0.8834673,0.08705546,0.0002800144,0.024834685,0.0006561456],"about_ca_topic_score_codex":0.001568795,"about_ca_topic_score_gemma":0.00059616996,"teacher_disagreement_score":0.9870554,"about_ca_system_score_codex":0.00006780115,"about_ca_system_score_gemma":0.000013699772,"threshold_uncertainty_score":0.99998707},"labels":[],"label_agreement":null},{"id":"W2571653954","doi":"10.1109/icset.2016.7811816","title":"Minmax profit sharing scheme for cooperative wind power producers","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Mathematical optimization; Minimax; Profit (economics); Computer science; Cooperative game theory; Wind power; Computation; Electricity; Electricity market; Operations research; Microeconomics; Game theory; Environmental economics; Economics; Mathematics; Engineering; Algorithm","score_opus":0.013502146711945695,"score_gpt":0.21548487338105557,"score_spread":0.20198272666910988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2571653954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7341164,0.00011392409,0.09173911,0.0021139851,0.0021304584,0.0016593644,0.000015508775,0.0014455846,0.16666572],"genre_scores_gemma":[0.9708137,0.0000065720556,0.00570019,0.00009889426,0.0001863437,0.00015500933,0.0000030628034,0.000058826154,0.022977384],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992298,0.0000029531686,0.00013528108,0.00024369081,0.000120042474,0.00026823085],"domain_scores_gemma":[0.9995796,0.000023631414,0.000010688674,0.00026467466,0.00007086955,0.00005050263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013302022,0.00013655909,0.000107721906,0.00005872796,0.000035930465,0.000026925818,0.00014761591,0.0000363046,0.00039206105],"category_scores_gemma":[0.000050772785,0.00009249935,0.000036187957,0.00008707108,0.00001832376,0.0001826455,0.00005737552,0.000031596228,0.00012909865],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116098214,0.00007917158,0.011785592,0.00038370723,0.0012502241,0.000014080788,0.001250113,0.08525301,0.2509723,0.11760194,0.5211575,0.010136255],"study_design_scores_gemma":[0.0024943408,0.0001867832,0.0036962293,0.00015475838,0.000036555426,0.0000031325853,0.00026624682,0.030232165,0.3775744,0.0002955274,0.58397865,0.001081217],"about_ca_topic_score_codex":0.000002588578,"about_ca_topic_score_gemma":0.000007963837,"teacher_disagreement_score":0.23669736,"about_ca_system_score_codex":0.00013508003,"about_ca_system_score_gemma":0.000009517378,"threshold_uncertainty_score":0.42927936},"labels":[],"label_agreement":null},{"id":"W2574286572","doi":"","title":"Efficient Appliances Recognition in Smart Homes Based on Active and Reactive Power, Fast Fourier Transform and Decision Trees.","year":2015,"lang":"en","type":"article","venue":"National Conference on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Computer science; AC power; Decision tree; Fourier transform; Artificial intelligence; Power (physics); Computer vision; Speech recognition; Mathematics","score_opus":0.07435391982588865,"score_gpt":0.29191103222261383,"score_spread":0.21755711239672518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2574286572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7580152,0.000056409703,0.1799256,0.0007730667,0.00069832546,0.00069755316,0.00008115834,0.00015227872,0.059600413],"genre_scores_gemma":[0.99845064,0.00003242932,0.0012784041,0.00008825715,0.000038752856,0.000068317866,0.00001935051,0.000013913461,0.000009910794],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871385,0.00002548229,0.00025034847,0.00030852997,0.0005201022,0.00018166268],"domain_scores_gemma":[0.9993409,0.00024745663,0.000036576996,0.000088318644,0.00018562256,0.00010115049],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003106268,0.00017850808,0.00015652987,0.00031866907,0.000050019935,0.0000659601,0.00008475226,0.000080598176,0.00005122669],"category_scores_gemma":[0.0001409714,0.00017591887,0.000022123233,0.0002581346,0.00008664991,0.00010201805,0.000014079664,0.00018458793,0.00004999619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003945637,0.000117755946,0.000040157236,0.000007956165,0.0000114108925,0.000004459152,0.00044437364,0.33969975,0.0001668274,0.010990609,0.000055484135,0.64806664],"study_design_scores_gemma":[0.00015656589,0.00019772859,0.002198825,0.00012310321,0.000005340414,9.477909e-7,0.000881508,0.95008767,0.010938216,0.034938406,0.00024332148,0.00022835148],"about_ca_topic_score_codex":0.000028342118,"about_ca_topic_score_gemma":0.00032925763,"teacher_disagreement_score":0.6478383,"about_ca_system_score_codex":0.00020792647,"about_ca_system_score_gemma":0.00005604138,"threshold_uncertainty_score":0.71737635},"labels":[],"label_agreement":null},{"id":"W2575366990","doi":"10.3233/978-1-61499-672-9-1646","title":"On Truthful Auction Mechanisms for Electricity Allocation","year":2016,"lang":"en","type":"book-chapter","venue":"Frontiers in artificial intelligence and applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Vickrey–Clarke–Groves auction; Microeconomics; Computer science; Business; Economics; Auction theory; Common value auction","score_opus":0.02090184446914932,"score_gpt":0.22731757777793857,"score_spread":0.20641573330878926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575366990","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000006741215,0.00013514163,0.9557487,0.00012816413,0.0006486703,0.0008397542,0.00003757853,0.000135119,0.04232015],"genre_scores_gemma":[0.42027608,0.018541802,0.13146345,0.0012978488,0.0096242465,0.024905045,0.0017966717,0.0015620412,0.39053282],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99903107,0.0000042730253,0.00033138477,0.00032884453,0.0001129006,0.00019152291],"domain_scores_gemma":[0.9995467,0.00005309781,0.00006088572,0.00025303435,0.00003930745,0.00004698347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011836907,0.00021504772,0.00019975333,0.00030748497,0.00008512727,0.000029744255,0.0001405593,0.00019612076,0.000027252016],"category_scores_gemma":[0.000009229698,0.0002211208,0.000057768386,0.00007182995,0.000046478744,0.000055250588,0.000015255515,0.00013834465,0.000044542692],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009791353,0.000009822586,2.111445e-7,0.000022927672,0.00002451624,1.346961e-7,0.000012269451,0.012456306,0.00006841727,0.75755036,0.0020576774,0.22778758],"study_design_scores_gemma":[0.00002131223,0.000048656653,0.000001377913,0.00004765647,0.00002921258,3.3024094e-7,0.000021670152,0.034504283,0.0037706718,0.88464606,0.07666188,0.00024690985],"about_ca_topic_score_codex":0.0000022169797,"about_ca_topic_score_gemma":0.000016342443,"teacher_disagreement_score":0.8242852,"about_ca_system_score_codex":0.00019223623,"about_ca_system_score_gemma":0.0000115987095,"threshold_uncertainty_score":0.9017045},"labels":[],"label_agreement":null},{"id":"W2575468172","doi":"10.24251/hicss.2017.365","title":"Learning to Shift Thermostatically Controlled Loads","year":2017,"lang":"en","type":"article","venue":"Proceedings of the ... Annual Hawaii International Conference on System Sciences/Proceedings of the Annual Hawaii International Conference on System Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Demand response; Regret; Computer science; A priori and a posteriori; Key (lock); Load management; Mathematical optimization; Grid; Adversarial system; Load balancing (electrical power); Thompson sampling; Artificial intelligence; Machine learning; Electricity; Engineering; Mathematics","score_opus":0.03144026382206932,"score_gpt":0.281180233242323,"score_spread":0.24973996942025367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575468172","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13073207,0.0000132210025,0.00006916686,0.005867876,0.004858551,0.0010742197,0.00019912915,0.00024740014,0.85693836],"genre_scores_gemma":[0.9963406,0.000025598218,0.00036851453,0.00012501868,0.00048861624,0.00021526065,0.0000021508267,0.00005220764,0.0023820307],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99125165,0.00004919893,0.0017434703,0.0013145588,0.0046969117,0.0009442286],"domain_scores_gemma":[0.9927226,0.00021213583,0.0020959368,0.0004502894,0.004216497,0.0003025629],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","open_science"],"consensus_categories":[],"category_scores_codex":[0.0040646857,0.0008265596,0.0011154203,0.00081910955,0.0017735123,0.0020656218,0.012865089,0.00023796002,0.00010775143],"category_scores_gemma":[0.00033480657,0.0005396269,0.0005365755,0.0008528059,0.0018911507,0.0023259723,0.0017642779,0.0006855283,0.00009632765],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002696324,0.000086679735,0.004722782,0.00020872227,0.00022335665,0.0000013181261,0.0020404854,0.0035693357,0.0014023102,0.9854135,0.001581001,0.00048085692],"study_design_scores_gemma":[0.0033576265,0.0017140543,0.017865775,0.009108656,0.00016110826,0.000086697466,0.9413388,0.015485739,0.0037626552,0.0033953849,0.0020703205,0.0016532247],"about_ca_topic_score_codex":0.00024911755,"about_ca_topic_score_gemma":0.000023722972,"teacher_disagreement_score":0.9820181,"about_ca_system_score_codex":0.0005853677,"about_ca_system_score_gemma":0.00028436646,"threshold_uncertainty_score":0.99970555},"labels":[],"label_agreement":null},{"id":"W2588383513","doi":"10.1109/sasg.2016.7849660","title":"Quantifying the value of pumped storage hydro (PSH) in the Saudi electric grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Grid; Pumped-storage hydroelectricity; Value (mathematics); Computer science; Environmental science; Electrical engineering; Distributed generation; Engineering; Renewable energy; Geology; Geodesy","score_opus":0.016825142678433536,"score_gpt":0.21671616606080377,"score_spread":0.19989102338237022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588383513","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9577444,0.0003163454,0.014952943,0.0011618229,0.0006374752,0.00024530647,0.0000013747015,0.00017411954,0.024766186],"genre_scores_gemma":[0.99922353,0.00015076675,0.000086569395,0.00012583072,0.00013196746,0.0000291945,6.772474e-7,0.000021160975,0.00023027419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913394,0.000069432914,0.00021118468,0.00011793445,0.0002148705,0.00025260655],"domain_scores_gemma":[0.9992668,0.00025578687,0.000026712089,0.00042380515,0.000010363695,0.0000165335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005307202,0.00011678147,0.000119534,0.000106883715,0.00003400314,0.000015862894,0.00040060628,0.000033028653,0.00007555765],"category_scores_gemma":[0.000043418597,0.000051615883,0.000051205567,0.00041872673,0.00002003018,0.000081785474,0.00004608386,0.00009290942,0.000046525198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031124793,0.0001426958,0.010612716,0.0002014186,0.00031786965,0.00004192898,0.0016412716,0.6774296,0.11912694,0.11463784,0.05440399,0.021412585],"study_design_scores_gemma":[0.0025217799,0.00019218378,0.24394818,0.00022876017,0.00013346381,0.000022469225,0.0008483826,0.4832887,0.11946253,0.0016276267,0.1465916,0.0011343238],"about_ca_topic_score_codex":0.00011819264,"about_ca_topic_score_gemma":0.00014634783,"teacher_disagreement_score":0.23333545,"about_ca_system_score_codex":0.000060361268,"about_ca_system_score_gemma":0.0000064581604,"threshold_uncertainty_score":0.21048348},"labels":[],"label_agreement":null},{"id":"W2588632072","doi":"10.1109/npsc.2016.7858900","title":"Ancillary services in India — Evolution, implementation and benefits","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Electricity market; Electricity; Renewable energy; Commission; Core (optical fiber); Grid; Business; Environmental economics; Electricity retailing; Industrial organization; Telecommunications; Computer science; Engineering; Economics; Finance; Electrical engineering","score_opus":0.0046461452223213314,"score_gpt":0.19165387726380348,"score_spread":0.18700773204148216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588632072","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99294066,0.00029204358,0.0012824077,0.00009403711,0.00013500739,0.00006640825,0.0000031430943,0.00012962334,0.005056686],"genre_scores_gemma":[0.9994263,0.00015991305,0.00025366567,0.000046359597,0.000036132475,0.000014324345,0.0000033953754,0.000008596334,0.000051314462],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996465,0.0000037449227,0.000093992174,0.00007968382,0.00005984732,0.00011626561],"domain_scores_gemma":[0.9998803,0.000009914877,0.000006743816,0.00007240555,0.0000076117,0.000023017441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058136295,0.00005575844,0.00004391102,0.0000815013,0.000011041252,0.0000084096655,0.00003619397,0.000018822879,0.000081924525],"category_scores_gemma":[7.540856e-7,0.000042459214,0.0000054731026,0.00008516453,0.000004409882,0.00016441105,0.000027226939,0.000012397086,0.000019768133],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037689554,0.000010461798,0.87164354,0.00010459635,0.00004015169,0.0000038719327,0.00023567569,0.015512451,0.0021622253,0.03480506,0.0024931957,0.072985],"study_design_scores_gemma":[0.00034821217,0.0000066504076,0.9940242,0.0000163465,0.0000023967891,6.8367575e-7,0.00014594456,0.0009799583,0.0011688108,0.00023498497,0.0029932435,0.000078555815],"about_ca_topic_score_codex":0.00007233904,"about_ca_topic_score_gemma":0.00087122293,"teacher_disagreement_score":0.12238067,"about_ca_system_score_codex":0.00007090901,"about_ca_system_score_gemma":0.0000021538592,"threshold_uncertainty_score":0.17314366},"labels":[],"label_agreement":null},{"id":"W2588962148","doi":"10.1109/isgteurope.2016.7856285","title":"A bi-linear optimization model for collaborative energy management in smart grid","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Linear programming; Bilinear interpolation; Smart grid; Computer science; Integer programming; Optimization problem; Pareto principle; Linear model; Grid; Mathematics; Engineering","score_opus":0.013288374337810088,"score_gpt":0.2080935191301088,"score_spread":0.1948051447922987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588962148","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003606419,0.000028919392,0.97645146,0.00025019897,0.00035444688,0.0002464943,0.00001385319,0.00025231836,0.02204168],"genre_scores_gemma":[0.34787723,0.0016139034,0.6162508,0.00059056655,0.00041128264,0.0021440026,0.00009730632,0.00020681879,0.030808087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923116,0.000009677944,0.00020803485,0.00019828348,0.00011035792,0.0002424853],"domain_scores_gemma":[0.9996684,0.000028222285,0.000017197164,0.0002021882,0.000042020212,0.000041926105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000092651426,0.00014445161,0.00012477729,0.0001998405,0.000022388012,0.000014065474,0.00011426409,0.000043431013,0.000051879873],"category_scores_gemma":[0.0000061266574,0.00011201947,0.000030027648,0.0002846115,0.000012083879,0.00016081678,0.00004753296,0.000017449207,0.000010054864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014679527,0.000017551807,0.000023250828,0.000018520324,0.00005197571,0.0000018524305,0.000028174221,0.95948267,0.000047135985,0.027760705,0.010305014,0.0022484832],"study_design_scores_gemma":[0.0008867167,0.000015791267,0.000027319638,0.000019755482,0.000011226485,1.2653881e-7,0.000029290879,0.9768485,0.0005949708,0.00028171635,0.02111088,0.00017371407],"about_ca_topic_score_codex":0.000010242508,"about_ca_topic_score_gemma":0.00014794955,"teacher_disagreement_score":0.36020067,"about_ca_system_score_codex":0.00015168087,"about_ca_system_score_gemma":0.0000072303037,"threshold_uncertainty_score":0.45680213},"labels":[],"label_agreement":null},{"id":"W2590167772","doi":"10.1109/pesgm.2017.8273922","title":"Load synchronization and sustained oscillations induced by transactive control","year":2017,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Synchronism; Synchronization (alternating current); Flexibility (engineering); Computer science; Control (management); Diversity (politics); Business; Environmental economics; Microeconomics; Economics; Telecommunications","score_opus":0.007647427055615301,"score_gpt":0.20997606737427338,"score_spread":0.20232864031865808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2590167772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024540095,0.00043312428,0.92582864,0.00055604236,0.0010584492,0.00074043847,0.00006322108,0.00067297136,0.046107028],"genre_scores_gemma":[0.9984585,0.00016341571,0.00024401853,0.000029999967,0.0001115066,0.00008480604,0.00006700311,0.000046991372,0.0007937454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999137,0.000020176418,0.00018339051,0.00028043694,0.00018091877,0.00019811984],"domain_scores_gemma":[0.9993108,0.000033888336,0.000053186646,0.00043854341,0.00009456337,0.00006900678],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001096624,0.00024615185,0.00024843134,0.00008286012,0.000103999286,0.00015385091,0.00016808308,0.00022509227,0.00007267245],"category_scores_gemma":[0.000032545537,0.00026142746,0.00004310905,0.000034678233,0.00002777746,0.00011482318,0.00006640782,0.0002446022,0.0000075879534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011831008,0.000021258704,0.00017421675,0.0003086272,0.00060089835,0.0000039898987,0.00036680934,0.9809597,0.0009311455,0.0010639268,0.007665263,0.007892305],"study_design_scores_gemma":[0.0013189006,0.000024185289,0.0021472683,0.00006775471,0.00018064845,8.0019623e-7,0.000109102024,0.9875399,0.00067895046,0.000721999,0.006587453,0.0006230428],"about_ca_topic_score_codex":0.00018839985,"about_ca_topic_score_gemma":0.00011019143,"teacher_disagreement_score":0.97391844,"about_ca_system_score_codex":0.00036023377,"about_ca_system_score_gemma":0.000052771968,"threshold_uncertainty_score":0.9999838},"labels":[],"label_agreement":null},{"id":"W2592637384","doi":"10.1109/tsg.2017.2679702","title":"Aggregating a Large Number of Residential Appliances for Demand Response Applications","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Queueing theory; Computer science; Service (business); Operations research; Power demand; Peak demand; Dynamic demand; Duration (music); Order (exchange); Power consumption; Load management; Reliability engineering; Class (philosophy); Power (physics); Electricity; Computer network; Engineering; Business; Electrical engineering","score_opus":0.014877303082508469,"score_gpt":0.27471702253392605,"score_spread":0.2598397194514176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592637384","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04862232,0.000030312807,0.9473091,0.00013931534,0.001465089,0.00055671175,0.00017007627,0.00019687366,0.001510215],"genre_scores_gemma":[0.99330485,0.000057289428,0.0044501866,0.00002828826,0.00028956486,0.001113431,0.000005754815,0.000050703806,0.000699958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989576,0.000027328408,0.0003064989,0.00023739121,0.0001863662,0.0002848484],"domain_scores_gemma":[0.99889773,0.00016458744,0.00010513201,0.0007150032,0.000057638616,0.000059930426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038016864,0.00017241256,0.00020882113,0.00009771047,0.00056295027,0.00007155751,0.0003308591,0.000079511876,0.00007319449],"category_scores_gemma":[0.000012520423,0.00019026078,0.00014653844,0.0000927205,0.000068390545,0.00020642788,0.000003177785,0.00012806097,0.00006911657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012413776,0.00045957605,0.001082136,0.0007273371,0.0007804991,0.000008754042,0.00049931306,0.9465424,0.015617152,0.0011325829,0.016219448,0.01568942],"study_design_scores_gemma":[0.0058740927,0.00022414488,0.010499382,0.00042049596,0.0005266122,0.000025674257,0.00032908175,0.14538568,0.41137058,0.00081211503,0.4230982,0.0014339384],"about_ca_topic_score_codex":0.00002868752,"about_ca_topic_score_gemma":0.00014377836,"teacher_disagreement_score":0.9446825,"about_ca_system_score_codex":0.00005234689,"about_ca_system_score_gemma":0.000018421171,"threshold_uncertainty_score":0.77586097},"labels":[],"label_agreement":null},{"id":"W2592972005","doi":"10.1109/icwt.2016.7870860","title":"DC backup power supply monitoring in substation based on wireless sensor network","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Islam Indonesia; Universitas Indonesia; Canadian Patient Safety Institute","keywords":"Backup; Overcurrent; Wireless sensor network; Overvoltage; Transmitter; Computer science; Electrical engineering; Wireless; Power (physics); Engineering; Mains electricity; Battery (electricity); Real-time computing; Embedded system; Computer network; Telecommunications; Voltage; Operating system","score_opus":0.007716294231133454,"score_gpt":0.19511550749185838,"score_spread":0.18739921326072492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592972005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95155233,0.00001533191,0.030805806,0.00028019436,0.0017086456,0.00013243854,0.0000015653284,0.0004029675,0.015100735],"genre_scores_gemma":[0.997034,0.000019405841,0.0020120114,0.00004800127,0.00023810266,0.00002694444,0.0000025755264,0.00003853035,0.000580402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992061,0.00002069262,0.00016228286,0.00015798588,0.00015683971,0.0002960528],"domain_scores_gemma":[0.99959534,0.00010856034,0.000012610113,0.00022320233,0.000014039416,0.000046216606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001224918,0.00013122315,0.00010368508,0.000100825746,0.000018335822,0.000018427021,0.000082166895,0.00004619897,0.00023739012],"category_scores_gemma":[0.0000074471627,0.000102317426,0.000027174578,0.00018572327,0.000008203052,0.00009781046,0.000013073288,0.00005618956,0.00016609527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000151830745,0.000013790453,0.057882346,0.000010274742,0.000010895255,0.0000132598,0.000024010184,0.9331684,0.002086639,0.00071111746,0.0028085955,0.0032555058],"study_design_scores_gemma":[0.0025289932,0.00009549133,0.65319675,0.00048155073,0.000013013209,8.166058e-7,0.000101697435,0.2922154,0.034545913,0.00012644473,0.015877951,0.00081599905],"about_ca_topic_score_codex":0.000019544685,"about_ca_topic_score_gemma":0.00003702613,"teacher_disagreement_score":0.640953,"about_ca_system_score_codex":0.00015965663,"about_ca_system_score_gemma":0.000004073592,"threshold_uncertainty_score":0.41723835},"labels":[],"label_agreement":null},{"id":"W2596324651","doi":"","title":"On Reliability, Performance and Internet Power Consumption","year":2009,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Polytechnique Montréal","funders":"","keywords":"The Internet; Robustness (evolution); Computer science; Energy consumption; Power consumption; Reliability (semiconductor); Consumption (sociology); Power (physics); Engineering; World Wide Web","score_opus":0.006302571752656993,"score_gpt":0.1970840396433608,"score_spread":0.1907814678907038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2596324651","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9171873,0.00028550447,0.075508706,0.0006989885,0.00020597488,0.00030173763,0.0000042238853,0.0012629719,0.0045446046],"genre_scores_gemma":[0.9923879,0.00037888443,0.005362972,0.0012079894,0.00004708564,0.00008326342,0.00000858238,0.000038614864,0.00048473015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988028,0.000028730301,0.000266787,0.0002863403,0.00020286186,0.00041249412],"domain_scores_gemma":[0.9992201,0.000045339235,0.00003842134,0.00051982445,0.000025221278,0.00015113642],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002877422,0.00025609037,0.0002000011,0.0002555789,0.00005920646,0.00008781075,0.00021007597,0.00014171426,0.000057998954],"category_scores_gemma":[0.000040727737,0.0002640533,0.0000517799,0.00015859157,0.000044713113,0.00023068438,0.000066305845,0.00027764373,0.000048392627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025684873,0.00039869332,0.120659426,0.00023111506,0.00012236672,0.00007116947,0.0005468607,0.636304,0.0052554198,0.1033454,0.07024875,0.06255995],"study_design_scores_gemma":[0.00043280638,0.00035479502,0.4404952,0.000089298424,0.000018288427,0.000033521836,0.000010173849,0.54324573,0.0067472034,0.0013601376,0.006766001,0.00044687412],"about_ca_topic_score_codex":0.00012208155,"about_ca_topic_score_gemma":0.00006504569,"teacher_disagreement_score":0.31983578,"about_ca_system_score_codex":0.00031284674,"about_ca_system_score_gemma":0.000009695082,"threshold_uncertainty_score":0.99998116},"labels":[],"label_agreement":null},{"id":"W2596567060","doi":"10.1016/j.apenergy.2017.03.023","title":"An analysis on the energy consumption of circulating pumps of residential swimming pools for peak load management","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Chinese Academy of Sciences","keywords":"Energy consumption; Environmental science; Work (physics); Efficient energy use; Energy (signal processing); Consumption (sociology); Sampling (signal processing); Energy management; Estimation; Computer science; Simulation; Statistics; Automotive engineering; Engineering; Mathematics; Telecommunications; Electrical engineering","score_opus":0.01564660501756535,"score_gpt":0.2346303442369015,"score_spread":0.21898373921933614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2596567060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5758438,0.00009203441,0.37702334,0.000062429935,0.0005473147,0.00029245784,0.000019570682,0.00020050303,0.045918535],"genre_scores_gemma":[0.9985095,0.00007948407,0.00088244147,0.000036382942,0.000134336,0.00017160558,0.000039891092,0.000041475574,0.00010486901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864644,0.000021754835,0.000416116,0.0002885172,0.00036165147,0.0002654969],"domain_scores_gemma":[0.9983798,0.000089188645,0.00025085118,0.0011847506,0.00004877759,0.000046621368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003236177,0.00019935016,0.00032271133,0.00022795254,0.00020785286,0.000065846034,0.00056221127,0.00006973447,0.000046351885],"category_scores_gemma":[0.000013116755,0.0001818683,0.00016857625,0.00014809976,0.00007076484,0.00009029212,0.000106669286,0.000046684214,0.0000017688444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026911697,0.000033819917,0.00013571497,0.00006814791,0.00094833545,0.0000019160855,0.000047330457,0.717635,0.008910889,0.26534012,0.0001288838,0.0067229797],"study_design_scores_gemma":[0.0018424164,0.0001216311,0.060467854,0.0001225001,0.0023150924,0.0000010897842,0.00051500637,0.7137743,0.20896664,0.0041010035,0.0068924576,0.0008799875],"about_ca_topic_score_codex":0.0006327673,"about_ca_topic_score_gemma":0.00041702657,"teacher_disagreement_score":0.4226657,"about_ca_system_score_codex":0.00009131804,"about_ca_system_score_gemma":0.0000068468353,"threshold_uncertainty_score":0.74163735},"labels":[],"label_agreement":null},{"id":"W2597941533","doi":"10.1109/tsg.2017.2686801","title":"Optimal Demand Response for Distribution Feeders With Existing Smart Loads","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Power Authority; Ontario Centres of Excellence","keywords":"Smart grid; Thermostat; Demand response; Load management; Context (archaeology); Grid; Engineering; Automotive engineering; Peak demand; Computer science; Reliability engineering; Control engineering; Electrical engineering; Electricity","score_opus":0.022595995126074377,"score_gpt":0.24580697934773374,"score_spread":0.22321098422165936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2597941533","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22006334,0.00001333606,0.7755382,0.00024261142,0.0023170938,0.0003457909,0.00015271954,0.00037410995,0.00095276453],"genre_scores_gemma":[0.9953557,0.000020676856,0.0031797432,0.000036655,0.0002268251,0.00031535706,0.000035333684,0.00007729377,0.0007524196],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865484,0.000037562466,0.00025926006,0.0003458714,0.00024109095,0.00046135727],"domain_scores_gemma":[0.9988399,0.00016152825,0.00007019671,0.00072175445,0.00006919399,0.00013739176],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040992702,0.00029824785,0.00023898298,0.00011342163,0.0009632562,0.00021185861,0.0002922832,0.00010534155,0.00002678955],"category_scores_gemma":[0.000021374492,0.0002944094,0.00013110832,0.00009750412,0.00011415093,0.00033819836,0.0000027889403,0.00022071082,0.000041457377],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011427415,0.000066496876,0.000109865934,0.00006490548,0.00020227874,0.000014631987,0.00009418438,0.99081165,0.0011721432,0.000049345337,0.004356223,0.0019155156],"study_design_scores_gemma":[0.008927291,0.0017791699,0.022495896,0.00052717933,0.00077312125,0.00009608811,0.00064966717,0.55899537,0.16246347,0.000053485128,0.24065721,0.0025820509],"about_ca_topic_score_codex":0.000058747886,"about_ca_topic_score_gemma":0.0001631385,"teacher_disagreement_score":0.77529234,"about_ca_system_score_codex":0.00025211283,"about_ca_system_score_gemma":0.000028228269,"threshold_uncertainty_score":0.9999508},"labels":[],"label_agreement":null},{"id":"W2599564054","doi":"10.18034/ei.v4i2.188","title":"A Way to Unlock The Electricity Energy Market for The Common People Using CP Model","year":2016,"lang":"en","type":"article","venue":"Engineering International","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electricity; Electricity market; Business; Electrical engineering; Engineering","score_opus":0.009301680969105448,"score_gpt":0.20305781377522544,"score_spread":0.19375613280612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599564054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024171628,0.0000680347,0.9719877,0.0009974672,0.0012947497,0.00012754937,0.000018108136,0.00019631968,0.0011384152],"genre_scores_gemma":[0.9952483,0.00003429967,0.002900194,0.0001382278,0.00044153753,0.00015273322,0.0000026133018,0.000047590514,0.0010344664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924034,0.0000059197464,0.00016799947,0.00013493936,0.00020684028,0.00024396261],"domain_scores_gemma":[0.9993708,0.00029076356,0.000017776076,0.00023849508,0.00004080326,0.000041326064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017144994,0.00014491698,0.00009658871,0.00010079647,0.00006330952,0.000044489276,0.00046793724,0.000032243406,0.000048120066],"category_scores_gemma":[0.0000641257,0.00008513075,0.00007303032,0.00014118274,0.0000069150065,0.00007943389,0.00008849434,0.00006156693,0.000005281555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008239726,0.00000519185,0.000059308142,0.00000492486,0.000107784996,3.7039928e-7,0.00004408385,0.9792282,0.0033235615,0.0063301055,0.008698846,0.0021894104],"study_design_scores_gemma":[0.00016024803,0.0000069343214,0.0012431601,0.00002260545,0.00001327481,0.0000028066029,0.0000043346176,0.95386034,0.002242569,0.0001222602,0.042192645,0.00012883778],"about_ca_topic_score_codex":0.000039016086,"about_ca_topic_score_gemma":0.000062932384,"teacher_disagreement_score":0.9710767,"about_ca_system_score_codex":0.00023417186,"about_ca_system_score_gemma":0.000006671877,"threshold_uncertainty_score":0.34715313},"labels":[],"label_agreement":null},{"id":"W2600712084","doi":"10.1109/tsg.2017.2688486","title":"On the Performance of Distributed and Cloud-Based Demand Response in Smart Grid","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Demand response; Cloud computing; Computer network; Distributed computing; Smart grid; Bandwidth (computing); Wireless; Channel (broadcasting); Telecommunications; Engineering","score_opus":0.012190506972195255,"score_gpt":0.2111215584021995,"score_spread":0.19893105143000425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600712084","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9635684,0.000019789144,0.031928156,0.000608469,0.003101313,0.00024914282,0.000119245786,0.00010130318,0.00030419268],"genre_scores_gemma":[0.9994608,0.0000793682,0.00006382417,0.00008118613,0.00011261747,0.00009246624,0.0000062447552,0.000033289438,0.000070171525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888575,0.000086836015,0.0002886221,0.00022921695,0.00023057467,0.00027897442],"domain_scores_gemma":[0.99868536,0.0003408797,0.00006216676,0.0008148346,0.000027610833,0.000069173395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005559737,0.0002239337,0.00022612872,0.00017860532,0.00031664403,0.000056622885,0.00030508728,0.00008258264,0.000051109437],"category_scores_gemma":[0.000024464123,0.00018621495,0.000075260075,0.00014685033,0.00014332421,0.0001378352,0.0000035577764,0.00030280513,0.000026633883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009488134,0.000105671235,0.0012618152,0.00006892419,0.000063639956,0.000009494232,0.0000715633,0.99342847,0.0013164011,0.00004397688,0.002172362,0.0005088567],"study_design_scores_gemma":[0.0033146047,0.00086839456,0.2558505,0.00047227292,0.00011212754,0.000008664316,0.00006390618,0.525098,0.19561926,0.00002901155,0.017817035,0.00074620626],"about_ca_topic_score_codex":0.00006019606,"about_ca_topic_score_gemma":0.00016372596,"teacher_disagreement_score":0.46833044,"about_ca_system_score_codex":0.000094767514,"about_ca_system_score_gemma":0.000022070371,"threshold_uncertainty_score":0.7593625},"labels":[],"label_agreement":null},{"id":"W2601847920","doi":"","title":"An Experimental Study on Load-Peak Shaving in Smart Homes by Means of Online Admission Control","year":2012,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Architecture; Smart grid; Scheduling (production processes); Computer science; Building management system; Demand response; Home automation; Load management; Peaking power plant; Embedded system; Real-time computing; Distributed computing; Electric power system; Engineering; Control (management); Power (physics); Electricity; Operating system","score_opus":0.009337651553762278,"score_gpt":0.2401665862362022,"score_spread":0.23082893468243992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2601847920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9734109,0.0018561408,0.02235409,0.000118183976,0.00027914502,0.0008799845,0.000052099647,0.0006841366,0.00036529967],"genre_scores_gemma":[0.99662256,0.000041757747,0.0023218265,0.0002697029,0.00013862892,0.00036866785,0.00004115951,0.00011533125,0.00008034903],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99765897,0.00015051883,0.0005813969,0.00033189866,0.00052077725,0.0007564649],"domain_scores_gemma":[0.99864835,0.00006887943,0.00010047953,0.0007904326,0.00003647328,0.000355383],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006775727,0.00040337784,0.00047424607,0.00043184948,0.00006396981,0.000043832646,0.00043929252,0.00016574563,0.00006105425],"category_scores_gemma":[0.000054768647,0.000415088,0.00009550923,0.00038305766,0.000033326654,0.00046003782,0.00009452261,0.00033435487,0.000006396412],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027854383,0.010407162,0.47178057,0.00006726934,0.00018361455,0.00004087675,0.002733022,0.17589623,0.32907942,0.0008033724,0.0042559626,0.004473969],"study_design_scores_gemma":[0.0040643,0.0015465696,0.4850966,0.00016587318,0.000077746925,0.000012148869,0.0037699207,0.31047162,0.1918539,0.000028122315,0.0018325526,0.0010806433],"about_ca_topic_score_codex":0.0031231495,"about_ca_topic_score_gemma":0.0014795349,"teacher_disagreement_score":0.13722552,"about_ca_system_score_codex":0.00089345255,"about_ca_system_score_gemma":0.000039817907,"threshold_uncertainty_score":0.99983007},"labels":[],"label_agreement":null},{"id":"W2602184558","doi":"","title":"Gestion de stockage d'energie thermique d'un parc de chauffe-eaux par une commande a champ moyen","year":2016,"lang":"fr","type":"article","venue":"PhDT","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Art; Physics","score_opus":0.011780671475193431,"score_gpt":0.2108382235817056,"score_spread":0.19905755210651216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2602184558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5825744,0.0036561692,0.3685358,0.029804971,0.0019901916,0.00040149165,0.00003778859,0.00072512485,0.01227407],"genre_scores_gemma":[0.98122054,0.003646928,0.004648209,0.00042837672,0.0012932362,0.00024067488,0.00001365028,0.00016648968,0.008341877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99777967,0.00023808298,0.0003637506,0.00039185045,0.00021804438,0.0010086192],"domain_scores_gemma":[0.9986585,0.00021915109,0.00008737809,0.0007092497,0.000037818103,0.00028792437],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007139622,0.00040682527,0.00034169274,0.00012895212,0.00012569549,0.000052528572,0.00040069004,0.00028284444,0.0005179845],"category_scores_gemma":[0.000083231585,0.00037491973,0.00014215191,0.0002529358,0.000109094224,0.00022001445,0.00014261743,0.00028941574,0.0003891277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012851281,0.0006007364,0.022074215,0.0007859682,0.0013247085,0.00076976715,0.0060304934,0.47579652,0.064957134,0.09891572,0.03851245,0.29010376],"study_design_scores_gemma":[0.0046928693,0.00035896988,0.23385143,0.002034347,0.00032756157,0.00017611712,0.00023683296,0.13741846,0.10296776,0.052641205,0.46289924,0.0023952036],"about_ca_topic_score_codex":0.0021260988,"about_ca_topic_score_gemma":0.0005400662,"teacher_disagreement_score":0.4243868,"about_ca_system_score_codex":0.00080882065,"about_ca_system_score_gemma":0.00005260825,"threshold_uncertainty_score":0.9998703},"labels":[],"label_agreement":null},{"id":"W2604466268","doi":"10.1109/tetc.2017.2692098","title":"Mining Energy Consumption Behavior Patterns for Households in Smart Grid","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Emerging Topics in Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Energy consumption; Smart grid; Context (archaeology); Consumption (sociology); Interdependence; Big data; Smart meter; Energy management; Energy (signal processing); Data mining; Engineering","score_opus":0.03922780463775764,"score_gpt":0.27797375832551197,"score_spread":0.2387459536877543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604466268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51468015,0.0000144687065,0.48132685,0.00006387237,0.0034437212,0.00011468373,0.0000060365855,0.00015004129,0.0002001745],"genre_scores_gemma":[0.9963834,0.000067907284,0.003001576,0.000041128398,0.00027548923,0.000098698765,0.0000044466274,0.000050420454,0.000076876015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988152,0.00002271742,0.00037034004,0.00028087624,0.0001369357,0.0003739712],"domain_scores_gemma":[0.99935687,0.00008280067,0.00006302306,0.00043737944,0.000016515827,0.000043434018],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022580635,0.00019570786,0.00020792607,0.0002578956,0.0002703365,0.00008815904,0.0002860794,0.000096308744,0.0000149629295],"category_scores_gemma":[0.0000062103677,0.0002502492,0.00007946807,0.00007370188,0.000025490763,0.00015175092,0.00000606466,0.0002075358,0.000001893766],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006321896,0.000064988104,0.02279951,0.00007468745,0.000021720833,0.000016542814,0.0002639094,0.8904788,0.00010446114,0.00010323317,0.000060738254,0.08600511],"study_design_scores_gemma":[0.0013757526,0.00004422483,0.08783542,0.0003792878,0.000038247108,0.0000048855136,0.00009494844,0.90087175,0.0059086713,0.000029378874,0.002922124,0.0004952743],"about_ca_topic_score_codex":0.00027187704,"about_ca_topic_score_gemma":0.0018380447,"teacher_disagreement_score":0.48170328,"about_ca_system_score_codex":0.0001900242,"about_ca_system_score_gemma":0.00000762581,"threshold_uncertainty_score":0.999995},"labels":[],"label_agreement":null},{"id":"W2604523575","doi":"10.1109/tac.2018.2800796","title":"Sufficient Conditions for the Value Function and Optimal Strategy to be Even and Quasi-Convex","year":2018,"lang":"en","type":"preprint","venue":"IEEE Transactions on Automatic Control","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bellman equation; Markov decision process; Monotone polygon; Mathematical optimization; Function (biology); Value (mathematics); Convex function; Regular polygon; Mathematics; State space; Convex optimization; Markov process; Computer science; Statistics","score_opus":0.015313723855022762,"score_gpt":0.23737008428373355,"score_spread":0.2220563604287108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604523575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10302462,0.00010887687,0.89101666,0.0008678888,0.002167158,0.0019504968,0.0003003306,0.00047176974,0.000092216054],"genre_scores_gemma":[0.9962927,0.00003856626,0.00083254685,0.00034076837,0.00015282427,0.0021174976,0.000013875918,0.000063638356,0.00014756431],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986412,0.00005179543,0.00038744882,0.00039085004,0.0002205292,0.00030819818],"domain_scores_gemma":[0.998795,0.00045765899,0.00006085098,0.0004885563,0.000066755936,0.0001312155],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003042445,0.00035406547,0.00037295348,0.00022642431,0.00028708327,0.00017000583,0.00016705826,0.00017344498,0.00011837684],"category_scores_gemma":[0.000009561939,0.00030824044,0.00012891064,0.000106570675,0.000089554494,0.00006394619,0.0000057288653,0.0002467987,0.0000177733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003161453,0.0000766595,0.0000012241335,0.00020491098,0.0005899631,6.484325e-7,0.00026890406,0.9900683,0.00018614644,0.00034081182,0.0012069461,0.0070238826],"study_design_scores_gemma":[0.0011169012,0.00041160977,0.0012080723,0.00008875204,0.0007300562,0.0000046976056,0.00023537762,0.9945387,0.00015234877,0.00024789982,0.00095847977,0.00030709946],"about_ca_topic_score_codex":0.00004666847,"about_ca_topic_score_gemma":0.000087545755,"teacher_disagreement_score":0.8932681,"about_ca_system_score_codex":0.00012426668,"about_ca_system_score_gemma":0.00004034947,"threshold_uncertainty_score":0.999937},"labels":[],"label_agreement":null},{"id":"W2605290472","doi":"10.18280/mmep.040112","title":"DMFC water management in presence of heat sources","year":2017,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Environmental science","score_opus":0.019023825544728964,"score_gpt":0.19620102608710874,"score_spread":0.1771772005423798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605290472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38551575,0.00018992173,0.60856307,0.000048418966,0.0001306933,0.00018141374,6.099128e-7,0.00015833438,0.0052117826],"genre_scores_gemma":[0.9853199,0.00014633016,0.014314763,0.0000017673408,0.0000224934,0.000048026854,8.9370616e-7,0.000031737105,0.000114081864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916506,0.0000035116718,0.00026220304,0.00015248504,0.00013424366,0.0002824698],"domain_scores_gemma":[0.9995407,0.000024529892,0.000011618394,0.00036215835,0.0000077774885,0.000053219574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021527903,0.00015165578,0.0002141911,0.00010142543,0.00004411241,0.000066140616,0.00021038123,0.00004656602,0.000008689056],"category_scores_gemma":[0.000006219929,0.00012316134,0.000029238834,0.000027826607,0.00003164133,0.00011206455,0.000118343254,0.00009854046,0.000008237129],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011989154,0.000016335189,0.00003693835,0.0013535474,0.00003456821,0.0000042542492,0.00042017022,0.991512,0.00031546634,0.006044856,0.0000075341986,0.0002531044],"study_design_scores_gemma":[0.00017518367,0.000008568316,0.000086802815,0.00034964748,0.000012992283,0.0000018119765,0.00001648471,0.9916499,0.0017634333,0.005481524,0.00030349998,0.00015014953],"about_ca_topic_score_codex":0.000014230282,"about_ca_topic_score_gemma":0.0000012920129,"teacher_disagreement_score":0.59980416,"about_ca_system_score_codex":0.000016113794,"about_ca_system_score_gemma":6.016966e-7,"threshold_uncertainty_score":0.5022374},"labels":[],"label_agreement":null},{"id":"W2606581894","doi":"10.18260/1-2--22566","title":"The Design of a Wi-Fi Enabled Cloud Monitoring Device","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cloud computing; Computer science; Server; Metering mode; Embedded system; Real-time computing; Computer network; Engineering; Operating system","score_opus":0.03196947016710757,"score_gpt":0.2061475935076629,"score_spread":0.17417812334055532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606581894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085127726,0.0014259286,0.8582714,0.001445892,0.003046846,0.00052760256,0.0000011179793,0.0014247963,0.048728675],"genre_scores_gemma":[0.99441314,0.00012515702,0.004727496,0.000056511082,0.00041417862,0.000019454388,2.9385575e-7,0.000024302215,0.00021947893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994841,0.0000187027,0.00014226326,0.00008026796,0.000117628166,0.00015699498],"domain_scores_gemma":[0.99966,0.00010399216,0.000013710161,0.0001581141,0.000017160386,0.00004698834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011823129,0.00008179018,0.0000864804,0.000013507888,0.00003742218,0.000020724634,0.0001907295,0.000020508285,0.00002509949],"category_scores_gemma":[0.000030876374,0.000060010552,0.000025563366,0.00016842481,0.000009977974,0.00004580347,0.000051835712,0.000058694815,0.000042340056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007421499,0.0000030908102,0.00026090522,0.000039313913,0.00007599579,0.0000027120232,0.00017503272,0.9816343,0.0057575265,0.0012562956,0.009554549,0.0012328088],"study_design_scores_gemma":[0.00046098727,0.00006534701,0.0012175506,0.00003220373,0.000046677418,8.0894574e-7,0.0007077042,0.67035085,0.19825147,0.00014065375,0.1284327,0.0002930159],"about_ca_topic_score_codex":0.000011016849,"about_ca_topic_score_gemma":0.0000013694162,"teacher_disagreement_score":0.9092854,"about_ca_system_score_codex":0.000022449898,"about_ca_system_score_gemma":0.0000048803486,"threshold_uncertainty_score":0.24471594},"labels":[],"label_agreement":null},{"id":"W2611511120","doi":"10.5539/jms.v7n4p16","title":"Financial Viability of Residential Photovoltaic and Battery Systems in Californias","year":2017,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Battery (electricity); Electricity; Photovoltaics; Payback period; Benchmark (surveying); Tariff; Computer science; Environmental economics; Computation; Finance; Automotive engineering; Reliability engineering; Economics; Environmental science; Business; Electrical engineering; Engineering; Power (physics); Microeconomics; Production (economics)","score_opus":0.00574765949606628,"score_gpt":0.2119456508129835,"score_spread":0.2061979913169172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611511120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.996535,0.00049426674,0.0015546134,0.00012243871,0.0004679436,0.00030539982,0.0000026096511,0.000009894794,0.0005078158],"genre_scores_gemma":[0.9994549,0.0002571196,0.00010972465,0.000006791921,0.000086237254,0.000008375375,4.207081e-7,0.000009187186,0.00006719801],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987615,0.000066737484,0.00058505835,0.00014706353,0.00023064627,0.0002090346],"domain_scores_gemma":[0.9992231,0.000045036937,0.00017814156,0.00037207297,0.00012574722,0.00005588234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001561652,0.00013415773,0.00034796615,0.00021006666,0.000083753366,0.0000939759,0.0002221041,0.00005929502,0.000007171197],"category_scores_gemma":[0.0002461812,0.00012442374,0.00005835744,0.00006227795,0.00014321148,0.00030881193,0.00021497844,0.00016226481,1.981434e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024832046,0.000149109,0.919826,0.0063664443,0.00015680538,0.00026405667,0.00035856885,0.062229283,0.000046065452,0.001989457,0.0017610735,0.0066048275],"study_design_scores_gemma":[0.0009592807,0.00006896364,0.9816126,0.0000795972,0.000056079843,0.0000064011942,0.0006933397,0.0092387805,0.000073852236,0.0034861176,0.0035905624,0.00013439341],"about_ca_topic_score_codex":0.000310609,"about_ca_topic_score_gemma":0.00013562341,"teacher_disagreement_score":0.061786644,"about_ca_system_score_codex":0.00019190893,"about_ca_system_score_gemma":0.000026296035,"threshold_uncertainty_score":0.50738525},"labels":[],"label_agreement":null},{"id":"W2611819112","doi":"","title":"Pipeline Optimization Using DRA Degradation Models","year":2015,"lang":"en","type":"article","venue":"PSIG Annual Meeting","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Pipeline (software); Degradation (telecommunications); Environmental science; Petroleum engineering; Computer science; Geology; Telecommunications","score_opus":0.03978984286566662,"score_gpt":0.23348487234388413,"score_spread":0.1936950294782175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611819112","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043893605,0.00020972079,0.9306808,0.000044938173,0.00075858674,0.0000958692,0.000004315981,0.00050591864,0.023806244],"genre_scores_gemma":[0.8867928,0.000019351239,0.11227562,0.000051155836,0.00048121926,0.000010437657,0.000045046898,0.00006371752,0.00026068994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915576,0.000028923476,0.00022684425,0.0001498246,0.00021630547,0.00022233436],"domain_scores_gemma":[0.9995888,0.000020458534,0.00003749779,0.00014979213,0.00011552261,0.00008791371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003204879,0.00013060561,0.0001119329,0.00010964552,0.00005227398,0.000043767308,0.00009704322,0.000049980925,0.000007249813],"category_scores_gemma":[0.00007214117,0.00014501029,0.000024595378,0.00022500005,0.000009908381,0.0004969133,0.00004854502,0.00007272407,0.000012733354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030018944,0.000006840809,0.000077311015,0.000013592177,0.000010222578,0.000001877242,0.0003730469,0.99566233,0.00007208359,0.00018065909,0.0023904827,0.0012085207],"study_design_scores_gemma":[0.000207904,0.000008087807,0.000006752725,0.00003334093,0.000018078623,0.0000023576179,0.0005100358,0.99684644,0.00062239624,0.00013787756,0.0014437037,0.00016300788],"about_ca_topic_score_codex":0.00007731188,"about_ca_topic_score_gemma":0.000007510177,"teacher_disagreement_score":0.84289914,"about_ca_system_score_codex":0.00013890282,"about_ca_system_score_gemma":0.000012039106,"threshold_uncertainty_score":0.5913348},"labels":[],"label_agreement":null},{"id":"W2612224301","doi":"10.1109/icit.2017.7915432","title":"Taylor series approximation of ZIP model for on-line estimation of residential loads' parameters","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Taylor series; Voltage; Series (stratigraphy); AC power; Line (geometry); Representation (politics); Electric power system; Computer science; Polynomial; Control theory (sociology); Range (aeronautics); Power (physics); Voltage optimisation; Estimation theory; Mathematical optimization; Mathematics; Algorithm; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.037229198376109905,"score_gpt":0.2625621470602051,"score_spread":0.22533294868409517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612224301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16722262,0.0000034778366,0.8305556,0.00008428985,0.00020485082,0.00018831661,0.000008115305,0.000059441758,0.0016733032],"genre_scores_gemma":[0.9005743,0.000004364688,0.099033505,0.000005512777,0.00002324606,0.00004143593,0.000018172563,0.000015065156,0.00028439806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947137,0.0000037649675,0.0002223122,0.000088172645,0.0001227879,0.00009162531],"domain_scores_gemma":[0.99948174,0.000022566303,0.00009250545,0.0003482009,0.000037953654,0.00001701017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113003094,0.00008169186,0.00013310893,0.000072015006,0.000041896026,0.000022910255,0.00014170872,0.00003605609,0.0000067751275],"category_scores_gemma":[0.00007991614,0.00007987793,0.00004597531,0.000021905656,0.000033642973,0.00026559323,0.000027357411,0.00002329341,0.0000022547924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003824689,0.000013674846,0.000011260574,0.00018135633,0.00003421093,7.9993896e-8,0.00006842328,0.9872188,0.0012440186,0.007828631,0.00048764233,0.002873643],"study_design_scores_gemma":[0.00027945443,0.000042968502,0.00020918234,0.000018510445,0.000020114165,1.13864175e-7,0.000015273738,0.8776292,0.119312204,0.002398501,0.000009474037,0.00006495493],"about_ca_topic_score_codex":0.000033874807,"about_ca_topic_score_gemma":0.00002497523,"teacher_disagreement_score":0.7333517,"about_ca_system_score_codex":0.000020474201,"about_ca_system_score_gemma":0.000003932145,"threshold_uncertainty_score":0.32573274},"labels":[],"label_agreement":null},{"id":"W2612421670","doi":"10.1016/j.ijepes.2017.10.019","title":"On bilevel planning of advanced microgrids","year":2017,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Microgrid; Mathematical optimization; Investment (military); Computer science; Operations research; Energy (signal processing); Comprehensive planning; Energy planning; Optimization problem; Engineering; Control (management); Mathematics; Renewable energy; Civil engineering","score_opus":0.009362997844748894,"score_gpt":0.25035607463857446,"score_spread":0.24099307679382556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612421670","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78424007,0.006274046,0.10906986,0.0005096459,0.037194632,0.00016300364,0.000023558003,0.00015558928,0.062369622],"genre_scores_gemma":[0.99881154,0.00009451677,0.00020992543,0.00004335624,0.0005503575,0.0000040185814,0.0000019282884,0.00002869449,0.00025568498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99841535,0.000026946294,0.00061057083,0.00011175483,0.0006355293,0.00019983602],"domain_scores_gemma":[0.99880296,0.0001114087,0.00044774154,0.0002510472,0.0003002561,0.00008659274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021292605,0.00015442015,0.0002941028,0.00035816367,0.000045796583,0.00009918893,0.00091418717,0.000069494934,0.00001664454],"category_scores_gemma":[0.00014700631,0.00013476028,0.0001453007,0.000065191816,0.000031454485,0.00021910192,0.000051604744,0.00018086497,0.000004530655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016956103,0.0001109995,0.0007437696,0.000009969047,0.0007818751,0.00023133002,0.000050476465,0.94013995,0.01303382,0.027026419,0.011250055,0.006451746],"study_design_scores_gemma":[0.009276619,0.0028564807,0.043319922,0.0028373757,0.00018870572,0.0011028496,0.00016573598,0.19586638,0.09883936,0.0039531277,0.63973796,0.0018554898],"about_ca_topic_score_codex":0.00003459367,"about_ca_topic_score_gemma":0.0000012873951,"teacher_disagreement_score":0.7442736,"about_ca_system_score_codex":0.00020071155,"about_ca_system_score_gemma":0.000026464853,"threshold_uncertainty_score":0.54953647},"labels":[],"label_agreement":null},{"id":"W2612838918","doi":"10.1109/icei.2017.57","title":"A Distributed Optimal Load Control Model for Heterogeneous Homes Responding to Time of Use","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Payment; Benchmark (surveying); Control (management); Computer science; Demand response; Load management; Load profile; Energy management; Software; Energy management system; Stability (learning theory); Load shifting; Operations research; Energy (signal processing); Engineering; Operating system","score_opus":0.017224411906123678,"score_gpt":0.23380787349039842,"score_spread":0.21658346158427474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612838918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3620508,0.000015300542,0.63699657,0.00007513371,0.00009863543,0.00024002214,0.00013466402,0.00013596051,0.00025292204],"genre_scores_gemma":[0.98716253,0.000004240731,0.010702494,0.000036278074,0.000039248014,0.00006670184,0.00001256275,0.00003183622,0.0019441101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993022,0.0000050159265,0.00017503502,0.00014701959,0.00012621476,0.00024449042],"domain_scores_gemma":[0.99926925,0.00005610725,0.00003388875,0.000507958,0.00005544065,0.00007735892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011954925,0.00012616251,0.00020506153,0.00011271315,0.000074219846,0.00008756439,0.0002691276,0.000040799318,0.000021460106],"category_scores_gemma":[0.00012229908,0.00012358466,0.00007718073,0.000047059053,0.000016113097,0.00015778735,0.000076241864,0.000027564416,0.000019951696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092045855,0.000009429593,0.00011154394,0.000018975092,0.000097740965,0.0000033118258,0.000036723653,0.989972,0.005215005,0.00035236328,0.0038338206,0.00025703604],"study_design_scores_gemma":[0.00069577456,0.000037864524,0.00045336012,0.000013687297,0.00002730988,9.741498e-7,0.0000032521111,0.98965657,0.0064614546,0.000016113641,0.0024902262,0.000143418],"about_ca_topic_score_codex":0.00001421888,"about_ca_topic_score_gemma":0.000011263094,"teacher_disagreement_score":0.6262941,"about_ca_system_score_codex":0.00009045866,"about_ca_system_score_gemma":0.0000091882175,"threshold_uncertainty_score":0.50396365},"labels":[],"label_agreement":null},{"id":"W2612850393","doi":"10.15173/esr.v19i1.534","title":"HOUSEHOLD PREFERENCES FOR TIME-OF-USE RATES IN THE PORTUGUESE ELECTRICITY MARKET","year":2012,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Quantile regression; Electricity; Consumption (sociology); Portuguese; Economics; Econometrics; Electricity market; Logit; Ordered logit; Nested logit; Logistic regression; Consumer behaviour; Microeconomics; Business; Marketing; Statistics; Mathematics","score_opus":0.058631422824355704,"score_gpt":0.2749631069821777,"score_spread":0.21633168415782197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2612850393","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0079894615,0.98505175,0.00036358522,0.00013778952,0.00037740878,0.00040100343,0.0000092799155,0.000105179795,0.0055645625],"genre_scores_gemma":[0.18980372,0.8076732,0.00036070583,0.0006352289,0.0001853157,0.0006431661,0.000012006888,0.000031504413,0.00065515377],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989627,0.000102843784,0.00035207559,0.00011940888,0.00014935892,0.00031361743],"domain_scores_gemma":[0.9991557,0.0004365551,0.00006448916,0.00028203882,0.00003459716,0.000026620988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074640755,0.00018009148,0.00042607656,0.000060305352,0.000030008376,0.0000060460357,0.00022206808,0.000027149155,0.000030535004],"category_scores_gemma":[0.00020960244,0.00011579921,0.00009228921,0.00036360716,0.000031707834,0.00015629172,0.000055209257,0.000059451566,0.000002917981],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017270982,0.00019222738,0.0069247456,0.0076066186,0.0010578153,0.0000037753227,0.0004235055,0.006058956,0.00002929134,0.004200649,0.89907575,0.07440937],"study_design_scores_gemma":[0.00026060335,0.00006644946,0.046240047,0.0012170709,0.00026007017,0.0000029451721,0.00008453719,0.0009314842,0.0005298658,0.00015243217,0.9498406,0.00041387966],"about_ca_topic_score_codex":0.000023273486,"about_ca_topic_score_gemma":0.00002827696,"teacher_disagreement_score":0.18181425,"about_ca_system_score_codex":0.000039886356,"about_ca_system_score_gemma":0.0000044772282,"threshold_uncertainty_score":0.47221544},"labels":[],"label_agreement":null},{"id":"W2613477346","doi":"","title":"Standby and Off-Mode Energy Losses In New Appliances Measured in Shops","year":2010,"lang":"en","type":"preprint","venue":"Virtual Community of Pathological Anatomy (University of Castilla La Mancha)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intertek (Canada)","funders":"","keywords":"Standby power; Mode (computer interface); Computer science; Environmental science; Business; Engineering; Electrical engineering; Operating system","score_opus":0.02010470168512051,"score_gpt":0.22186470545815615,"score_spread":0.20176000377303563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2613477346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98607993,0.0009505567,0.008018457,0.000100993595,0.00016688365,0.00016742178,0.000067130364,0.00010569001,0.0043429467],"genre_scores_gemma":[0.9952321,0.0024850606,0.0021097152,0.000014604411,0.000022895776,0.0000014123844,0.00003607499,0.000021686981,0.000076466844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9982489,0.00045604736,0.00033890497,0.0003139199,0.00033841428,0.00030384434],"domain_scores_gemma":[0.99866307,0.00031619243,0.0001687027,0.00064853835,0.000068658825,0.00013483758],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00065089803,0.00036505228,0.0008761556,0.0005227605,0.0000800428,0.000019027033,0.0009155294,0.0006438181,0.000052760366],"category_scores_gemma":[0.00007075516,0.00043407298,0.00012254952,0.00033466,0.0005721612,0.00012515287,0.0016782933,0.0016796472,0.000001162767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009666755,0.0016295037,0.032680694,0.0030299912,0.00050630345,0.0019270681,0.016783703,0.6916741,0.0066365027,0.046186224,0.0016433939,0.19633585],"study_design_scores_gemma":[0.012735944,0.0016543246,0.6108895,0.0041477177,0.0004336439,0.00011594293,0.037515145,0.22850233,0.0021392228,0.04084407,0.055762835,0.005259301],"about_ca_topic_score_codex":0.0047469176,"about_ca_topic_score_gemma":0.032576345,"teacher_disagreement_score":0.5782088,"about_ca_system_score_codex":0.00009884653,"about_ca_system_score_gemma":0.00006579722,"threshold_uncertainty_score":0.9998111},"labels":[],"label_agreement":null},{"id":"W2614026174","doi":"10.1109/icit.2017.7915420","title":"A semi-synthetic dataset development tool for household energy consumption analysis","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Probabilistic logic; Energy consumption; Power consumption; Energy management; Electric power; Key (lock); Energy management system; Energy (signal processing); Reliability engineering; Systems engineering; Power (physics); Data mining; Engineering; Artificial intelligence; Computer security","score_opus":0.03591394313670532,"score_gpt":0.23890325092699663,"score_spread":0.2029893077902913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2614026174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088822804,0.00007797327,0.90515506,0.000100054436,0.0006525301,0.00021478419,0.0005307439,0.0005888547,0.0038571875],"genre_scores_gemma":[0.98949975,0.0000613475,0.007956453,0.000093869625,0.00006973017,0.00020024017,0.0012293974,0.000031866388,0.00085734454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99923193,0.000006036952,0.00019843121,0.00021072214,0.00012526593,0.00022763606],"domain_scores_gemma":[0.9990627,0.000031228185,0.000039877363,0.00080405653,0.000012176721,0.000049941045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014791376,0.00014250416,0.00017291679,0.00015241603,0.00019240164,0.0001365472,0.00030522878,0.000044254262,0.00016405982],"category_scores_gemma":[0.000018390012,0.00013875218,0.00006436627,0.000053775177,0.000021818692,0.00014964279,0.000098706645,0.000028122307,0.000029777235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017791324,0.000058186095,0.0076014395,0.0001450754,0.0031763318,0.000009673168,0.00004919848,0.78597504,0.0006514379,0.0050210604,0.17315246,0.024142314],"study_design_scores_gemma":[0.00041670448,0.000007805862,0.027163258,0.000011899359,0.0004355267,9.253009e-7,0.000006345088,0.18355766,0.010322263,0.000030268187,0.77764994,0.00039742954],"about_ca_topic_score_codex":0.00004664359,"about_ca_topic_score_gemma":0.0003640643,"teacher_disagreement_score":0.90067697,"about_ca_system_score_codex":0.00008257971,"about_ca_system_score_gemma":0.000007726667,"threshold_uncertainty_score":0.5658149},"labels":[],"label_agreement":null},{"id":"W2615310803","doi":"10.3390/data3010008","title":"RAE: The Rainforest Automation Energy Dataset for Smart Grid Meter Data Analysis","year":2018,"lang":"en","type":"article","venue":"Data","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Thermostat; Smart meter; Smart grid; Automation; Electricity meter; Computer science; Test data; Real-time computing; Energy (signal processing); Electricity; Engineering; Power (physics); Electrical engineering","score_opus":0.059184727489375526,"score_gpt":0.2833796318320338,"score_spread":0.22419490434265826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2615310803","genre_codex":"methods","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042425792,0.00012846911,0.8305111,0.00068453053,0.0019038422,0.00026184256,0.16440693,0.00036169105,0.001317327],"genre_scores_gemma":[0.04121588,0.00006346094,0.009541056,0.00065971154,0.0014691199,0.000058318336,0.9467875,0.000042966716,0.00016200394],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989087,0.000025482415,0.0002451071,0.00038639197,0.00019105957,0.00024323756],"domain_scores_gemma":[0.9939665,0.00011454113,0.000043263946,0.0058062733,0.000024167599,0.000045213677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006316231,0.00014533717,0.00015828002,0.00013902977,0.00011777519,0.0001265948,0.0026644054,0.000039055252,0.00017065086],"category_scores_gemma":[0.00011451515,0.00011052196,0.000028606679,0.00047907574,0.00005548953,0.00071648863,0.0015178791,0.000045622397,0.000081942286],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048735587,0.000006761422,0.000101861246,0.000012570087,0.00076969503,7.5050735e-7,0.000013114346,0.007900079,0.00001613161,0.00047048434,0.98684466,0.0038590317],"study_design_scores_gemma":[0.00009180711,0.000005266448,0.0009856329,0.000001679205,0.0003149365,4.119387e-7,0.0000064416213,0.4783677,0.00005575451,0.000018361505,0.5200741,0.00007788376],"about_ca_topic_score_codex":0.0003395746,"about_ca_topic_score_gemma":0.0037181277,"teacher_disagreement_score":0.82097006,"about_ca_system_score_codex":0.000024097983,"about_ca_system_score_gemma":0.0000096875765,"threshold_uncertainty_score":0.49511728},"labels":[],"label_agreement":null},{"id":"W2620034093","doi":"10.1109/tsg.2017.2708684","title":"A Controlled Load Estimator-Based Energy Management System for Water Pumping Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Saudi Aramco","keywords":"Estimator; Energy management system; Energy management; Model predictive control; Time horizon; Electric power system; Computer science; Control theory (sociology); Mathematical optimization; Artificial neural network; Power (physics); Energy consumption; Engineering; Energy (signal processing); Control engineering; Control (management)","score_opus":0.013333790380490259,"score_gpt":0.213300220284977,"score_spread":0.19996642990448674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620034093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036219968,0.000050517192,0.97397125,0.00013624068,0.01398945,0.0010128298,0.00006525888,0.0009890185,0.0061634313],"genre_scores_gemma":[0.994269,0.000021603759,0.00092984334,0.000046569017,0.0003860685,0.0029344612,0.000013784171,0.00011964655,0.0012790093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979856,0.000039743056,0.0005198925,0.0004263012,0.00041470097,0.00061377074],"domain_scores_gemma":[0.99845773,0.00007714281,0.00008315285,0.0011415588,0.00009117707,0.00014922391],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038707443,0.00041105144,0.0005640497,0.00025890738,0.00083096744,0.00036943075,0.0004793099,0.00012302797,0.000023262013],"category_scores_gemma":[0.0000026289067,0.0003493134,0.00032307752,0.000057560024,0.000048396007,0.00020696344,0.000003946295,0.00013020028,0.00013221237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002402545,0.00006535554,0.0000042059814,0.0007047887,0.0006200005,0.00003204461,0.000017022161,0.99457335,0.00070731575,0.00059299514,0.0013908505,0.0010518007],"study_design_scores_gemma":[0.007658016,0.00008131722,0.000024328676,0.0003574166,0.00037326585,0.000007877032,0.00006498147,0.8744558,0.048746124,0.0000068074123,0.06768825,0.0005357832],"about_ca_topic_score_codex":0.00016818421,"about_ca_topic_score_gemma":0.00006388047,"teacher_disagreement_score":0.990647,"about_ca_system_score_codex":0.00056203594,"about_ca_system_score_gemma":0.000018350564,"threshold_uncertainty_score":0.9998959},"labels":[],"label_agreement":null},{"id":"W2620116181","doi":"10.2495/sdp-v12-n6-1043-1049","title":"Fulfilling the potential of nuclear power industry through demand side management","year":2017,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demand side; Nuclear power; Business; Natural resource economics; Nuclear industry; Environmental economics; Engineering; Economics; Nuclear engineering","score_opus":0.009778788942042111,"score_gpt":0.22756597106635518,"score_spread":0.21778718212431306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620116181","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9727115,0.000369352,0.0058681895,0.0003518018,0.0010438956,0.00006614103,5.606129e-7,0.000014110933,0.019574441],"genre_scores_gemma":[0.9959992,0.000107585896,0.003262418,0.000059885013,0.00016584173,0.0000016734994,0.0000012074065,0.000014287855,0.00038789245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990345,0.000010105221,0.00034343064,0.00007278144,0.00036259225,0.00017658278],"domain_scores_gemma":[0.999403,0.000022274022,0.00023091886,0.00010961614,0.00019937131,0.00003481916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038300475,0.00010694362,0.00012731577,0.0001377276,0.00021538409,0.0001951138,0.000504552,0.000057633257,0.000032745043],"category_scores_gemma":[0.000030969637,0.000084396626,0.00003772401,0.000032741278,0.000042966894,0.00042970962,0.000219115,0.0002258712,0.0000012152649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035239867,0.00009601958,0.015213319,0.00036274988,0.0048997896,0.011610326,0.020032957,0.87468165,0.00042424072,0.041471373,0.016499134,0.014356043],"study_design_scores_gemma":[0.002874845,0.00008009575,0.4255532,0.0010696092,0.0001638049,0.00034253532,0.10493372,0.007164826,0.0028738838,0.0037420373,0.45052317,0.000678265],"about_ca_topic_score_codex":0.0000062641407,"about_ca_topic_score_gemma":2.8258256e-7,"teacher_disagreement_score":0.8675168,"about_ca_system_score_codex":0.00008534737,"about_ca_system_score_gemma":0.000020280178,"threshold_uncertainty_score":0.34415945},"labels":[],"label_agreement":null},{"id":"W2625447160","doi":"10.1109/iciafs.2016.7946569","title":"Robust Non-Intrusive Load Monitoring (NILM) with unknown loads","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Subspace topology; Computer science; Energy (signal processing); Set (abstract data type); Maximum a posteriori estimation; A priori and a posteriori; Power (physics); Pattern recognition (psychology); Robustness (evolution); Artificial intelligence; Data mining; Mathematics; Statistics; Maximum likelihood","score_opus":0.010137922106292874,"score_gpt":0.172606104515082,"score_spread":0.1624681824087891,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625447160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30734757,0.0001238242,0.4166172,0.00040546095,0.0026181606,0.0002715853,0.0000021949645,0.0015208004,0.2710932],"genre_scores_gemma":[0.98670846,0.0000771299,0.004581334,0.000022560736,0.00056915445,0.00004214267,6.031321e-7,0.000060004848,0.007938603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990334,0.0000057980524,0.00014391898,0.00021456549,0.00024796557,0.00035437103],"domain_scores_gemma":[0.9994345,0.000035488116,0.000016450746,0.00036153267,0.0000549701,0.00009708442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007136351,0.00019877897,0.00014623813,0.00007108597,0.000038354705,0.00003265162,0.00018106603,0.000049917824,0.00026406982],"category_scores_gemma":[0.000008579348,0.00012326207,0.00003304787,0.00016230159,0.000023165936,0.0001973686,0.00006578946,0.00006575278,0.00039296751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038225087,0.00004189122,0.015848085,0.000089151785,0.0004106485,0.000109417786,0.00020155356,0.9174188,0.013774678,0.0029442837,0.024346178,0.024777085],"study_design_scores_gemma":[0.006949043,0.00047161485,0.08417164,0.0011309392,0.00022320777,0.000048546623,0.00051547243,0.06666494,0.40802494,0.0002273539,0.42820907,0.0033632321],"about_ca_topic_score_codex":0.00004060858,"about_ca_topic_score_gemma":0.000048801656,"teacher_disagreement_score":0.85075384,"about_ca_system_score_codex":0.00026695203,"about_ca_system_score_gemma":0.000016248507,"threshold_uncertainty_score":0.50509334},"labels":[],"label_agreement":null},{"id":"W2625740731","doi":"10.1109/icps.2017.7945113","title":"The bus-split method for residential load aggregation","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science; Power (physics); Algorithm; Physics","score_opus":0.015294856236956322,"score_gpt":0.27464758540556145,"score_spread":0.25935272916860513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625740731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028998333,0.00012096041,0.9119263,0.0011928672,0.0021240253,0.00024395793,0.0000014312312,0.00025237064,0.08123825],"genre_scores_gemma":[0.681769,0.00045058547,0.23570427,0.00022972729,0.0031011426,0.0006019561,0.000014202797,0.00014897803,0.07798015],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995333,0.000008268162,0.00009961546,0.00009175186,0.000117060845,0.00015002239],"domain_scores_gemma":[0.9993507,0.000077846955,0.000026162226,0.00048849656,0.00003446145,0.000022333277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036222817,0.000066702916,0.000057066325,0.000014287235,0.0003653725,0.00022560575,0.0002829027,0.000027155524,0.00002862859],"category_scores_gemma":[0.000106069005,0.00004894251,0.0000419048,0.0000152192,0.000015698266,0.00012371612,0.00005570608,0.000033329416,0.000038985763],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004081009,0.000010163084,0.00020640972,0.00006702794,0.0003374431,0.000003200315,0.00012576705,0.18915477,0.0018345924,0.17005315,0.3426748,0.29549184],"study_design_scores_gemma":[0.00040127442,0.000012031252,0.006214248,0.0000094982315,0.000036454927,7.77058e-7,0.000029261819,0.41249204,0.015727216,0.0041816104,0.5607497,0.00014585156],"about_ca_topic_score_codex":0.0001246527,"about_ca_topic_score_gemma":0.00051784806,"teacher_disagreement_score":0.6788691,"about_ca_system_score_codex":0.00005313371,"about_ca_system_score_gemma":0.0000062442277,"threshold_uncertainty_score":0.2810187},"labels":[],"label_agreement":null},{"id":"W2641144656","doi":"10.1109/ccece.2017.7946771","title":"Analytics of residential electrical energy profile","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College","funders":"","keywords":"Computer science; Analytics; Data science; Energy (signal processing); Physics","score_opus":0.010154735911591436,"score_gpt":0.21521633132330747,"score_spread":0.20506159541171604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2641144656","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054307498,0.00011467039,0.15337159,0.0001573633,0.0011269803,0.00008040462,0.0000029510657,0.00039928505,0.79043925],"genre_scores_gemma":[0.99401563,0.00003835877,0.0011914874,0.000011202971,0.00014212959,0.000005114917,0.000002358302,0.000014588139,0.0045791552],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951917,0.0000044763347,0.0001277281,0.000079485886,0.0001289893,0.00014016719],"domain_scores_gemma":[0.99948174,0.000009439272,0.00002701177,0.00042895344,0.000019639165,0.000033220098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000046594465,0.00006593185,0.000100259575,0.00006392451,0.000045889934,0.00003221995,0.00024679358,0.000034101184,0.00022110704],"category_scores_gemma":[0.000023653993,0.00006300755,0.000038616326,0.00004462727,0.000022927232,0.00007699507,0.00006536471,0.0000353323,0.000013795512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038715352,0.00009748204,0.006926063,0.00010430839,0.0005652763,0.000057631947,0.000039713148,0.3055961,0.008166376,0.2437223,0.41178197,0.022904055],"study_design_scores_gemma":[0.0003630195,0.00004350612,0.026334118,0.000010005178,0.00004542013,0.0000018608298,0.0000059559075,0.7690012,0.16316985,0.00069307396,0.04009502,0.00023699868],"about_ca_topic_score_codex":0.00015567862,"about_ca_topic_score_gemma":0.00009582232,"teacher_disagreement_score":0.9397081,"about_ca_system_score_codex":0.000022488915,"about_ca_system_score_gemma":0.0000059522094,"threshold_uncertainty_score":0.25693733},"labels":[],"label_agreement":null},{"id":"W2708946506","doi":"10.1109/ccece.2017.7946739","title":"Impact of demand response management on improving social welfare of remote communities through integrating renewable energy resources","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Resources Canada","keywords":"Demand response; Renewable energy; Environmental economics; Renewable resource; Load management; Social Welfare; Computer science; Demand management; Diesel generator; Energy management; Welfare; Business; Energy (signal processing); Economics; Diesel fuel; Engineering; Electricity; Automotive engineering","score_opus":0.016608525565536523,"score_gpt":0.2529737881791002,"score_spread":0.2363652626135637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2708946506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8293179,0.0000539182,0.022610435,0.00015061602,0.00019897759,0.00010531536,0.000011008214,0.00016685422,0.14738494],"genre_scores_gemma":[0.9937503,0.00004184884,0.0049906354,0.000014911978,0.000059655355,0.0000059921877,0.000005843821,0.000043163804,0.0010876952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988811,0.00009647377,0.00037069904,0.0001322257,0.0002456992,0.00027381137],"domain_scores_gemma":[0.998804,0.00007875244,0.00019880931,0.00083830836,0.000049992115,0.000030154115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042911118,0.0002239737,0.00032041222,0.00015531688,0.00041761217,0.000075597665,0.00059010583,0.00007380837,0.000078578065],"category_scores_gemma":[0.000038565362,0.00019392325,0.00015975864,0.00008024586,0.000115284674,0.00019888488,0.0003290409,0.00010475012,7.0340195e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00091998914,0.00008764042,0.0010937337,0.000492933,0.0010227639,0.00001973706,0.0053749816,0.9415717,0.0038390239,0.011583677,0.0037626382,0.030231178],"study_design_scores_gemma":[0.005200006,0.0020273952,0.22512387,0.0013243441,0.00042442165,0.000008452241,0.04133369,0.6036814,0.06618282,0.0028688053,0.04965205,0.002172757],"about_ca_topic_score_codex":0.024419695,"about_ca_topic_score_gemma":0.00159311,"teacher_disagreement_score":0.33789033,"about_ca_system_score_codex":0.00013684861,"about_ca_system_score_gemma":0.000007052376,"threshold_uncertainty_score":0.98207676},"labels":[],"label_agreement":null},{"id":"W2724401442","doi":"10.1007/978-3-319-61566-0_18","title":"Managing Energy in Smart Homes Using Binary Particle Swarm Optimization","year":2017,"lang":"en","type":"book-chapter","venue":"Advances in intelligent systems and computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Microgrid; Particle swarm optimization; Renewable energy; Computer science; Energy management; Demand response; Smart grid; Environmental economics; Mathematical optimization; Electricity; Energy (signal processing); Engineering; Electrical engineering; Mathematics; Economics; Algorithm","score_opus":0.017562083237852886,"score_gpt":0.2377408826353603,"score_spread":0.22017879939750742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2724401442","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004321592,0.118068494,0.6876817,0.000021176615,0.0066866796,0.0005109543,0.0000042093193,0.0003498825,0.18235534],"genre_scores_gemma":[0.95837873,0.02892001,0.0019154322,0.000021391075,0.000552449,0.000019061043,0.00002449556,0.00017022289,0.009998204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853206,0.000019630043,0.0005868884,0.00036638195,0.00017041755,0.00032462867],"domain_scores_gemma":[0.99936676,0.000062866275,0.00017744148,0.00031976996,0.000022467564,0.00005066931],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023596706,0.00032571462,0.00044361773,0.00028697518,0.000098417884,0.00011513711,0.00020255413,0.00012223082,0.00000558744],"category_scores_gemma":[0.0000068298014,0.00036615325,0.000046719677,0.00004169349,0.000043488915,0.00025109565,0.00017540682,0.00018682216,0.0000028786792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033487377,0.000005097894,0.00044564894,0.00033491387,0.000029186322,0.000055709334,0.00009522654,0.9654415,0.0000032579023,0.016340867,0.000011419504,0.017233813],"study_design_scores_gemma":[0.0001170637,0.000014732106,0.000021789485,0.002284711,0.000014097856,0.000009362176,0.00010355752,0.9664775,0.00003414158,0.00059853925,0.029959261,0.00036523357],"about_ca_topic_score_codex":0.00020493029,"about_ca_topic_score_gemma":0.00010583528,"teacher_disagreement_score":0.95405716,"about_ca_system_score_codex":0.00023436052,"about_ca_system_score_gemma":0.000007665834,"threshold_uncertainty_score":0.99987906},"labels":[],"label_agreement":null},{"id":"W2727305574","doi":"10.1049/iet-gtd.2016.1852","title":"Design and implementation of low‐cost universal smart energy meter with demand side load management","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; Saint Mary's University","funders":"","keywords":"Demand side; Smart meter; Metre; Load shifting; Computer science; Load management; Energy management; Low energy; Reliability engineering; Smart grid; Energy (signal processing); Electrical engineering; Engineering; Environmental economics; Electricity; Mathematics; Economics","score_opus":0.011699920768761309,"score_gpt":0.223363870525896,"score_spread":0.2116639497571347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2727305574","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04476126,0.000088267276,0.9539769,0.00016190407,0.00015509881,0.00031265794,0.000024822935,0.00007530747,0.00044372375],"genre_scores_gemma":[0.9940082,0.00054366316,0.0047518737,0.000017035618,0.00005628844,0.00006251052,0.00044544582,0.000022147853,0.00009287477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99894947,0.000050395716,0.00025971088,0.0002454387,0.00029715616,0.0001978251],"domain_scores_gemma":[0.999423,0.000011517878,0.00009467274,0.00029976806,0.000080876205,0.000090117646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021975514,0.00018891771,0.00015412316,0.000057542584,0.00026534198,0.00010376085,0.00012371386,0.00006234276,0.00005267951],"category_scores_gemma":[0.0000018750557,0.00017551563,0.000035322777,0.00007117587,0.000048152517,0.00037457392,0.000023115665,0.00004786695,0.0000019041868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002532043,0.00011350553,0.00095755525,0.0003932243,0.00053911825,0.000037183738,0.0003401662,0.625451,0.09627886,0.01044118,0.010917774,0.2542772],"study_design_scores_gemma":[0.0031494317,0.00015975496,0.014578923,0.000109623885,0.0002510587,0.000006041415,0.00019586402,0.339279,0.614999,0.00012054643,0.026672224,0.00047854276],"about_ca_topic_score_codex":0.00009753622,"about_ca_topic_score_gemma":0.000085722204,"teacher_disagreement_score":0.9492469,"about_ca_system_score_codex":0.00020015538,"about_ca_system_score_gemma":0.000022006969,"threshold_uncertainty_score":0.7157319},"labels":[],"label_agreement":null},{"id":"W2730557540","doi":"10.1007/978-3-319-61542-4_18","title":"User Satisfaction Based Home Energy Management System for Smart Cities","year":2017,"lang":"en","type":"book-chapter","venue":"Advances in intelligent systems and computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Harmony search; User satisfaction; Smart grid; Harmony (color); Computer science; Genetic algorithm; Differential evolution; Grid; Energy management; Environmental economics; Energy (signal processing); Human–computer interaction; Engineering; Algorithm; Artificial intelligence; Machine learning; Mathematics; Electrical engineering; Economics","score_opus":0.012122626659690012,"score_gpt":0.21878568212564103,"score_spread":0.206663055465951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2730557540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014816519,0.02231187,0.7370207,0.0000066364123,0.011148836,0.0008549496,0.000027746268,0.0004745794,0.22800657],"genre_scores_gemma":[0.90733635,0.008305143,0.0028016914,0.000033895165,0.0015086988,0.00035926374,0.00010664498,0.00034301516,0.079205304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982006,0.00001594435,0.00068719697,0.0004771293,0.00025540707,0.00036372754],"domain_scores_gemma":[0.99900407,0.00012705597,0.0002647625,0.0004907245,0.00004835864,0.00006503201],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027018116,0.00048019583,0.00060971506,0.00036533084,0.00018428007,0.00017628325,0.00024104104,0.00017940522,0.0000054496463],"category_scores_gemma":[0.0000030065955,0.00051172357,0.000117445765,0.000019897541,0.000046991845,0.00016530004,0.00011083657,0.00015195775,0.0000073823976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011889891,0.0000030553012,0.00035289064,0.004750807,0.00017547575,0.00002504014,0.0000320219,0.6078592,6.941241e-7,0.32427952,0.00033682442,0.062172577],"study_design_scores_gemma":[0.00029802072,0.000039420873,0.00012171493,0.004826651,0.000070173635,0.000008393789,0.0001785491,0.26813284,0.000028240825,0.00070302887,0.7249587,0.0006342316],"about_ca_topic_score_codex":0.00011644044,"about_ca_topic_score_gemma":0.00018429893,"teacher_disagreement_score":0.9071882,"about_ca_system_score_codex":0.00040329277,"about_ca_system_score_gemma":0.0000070652304,"threshold_uncertainty_score":0.99973345},"labels":[],"label_agreement":null},{"id":"W2734352835","doi":"10.1007/s10479-020-03580-1","title":"Balancing supply and demand in the presence of renewable generation via demand response for electric water heaters","year":2020,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Renewable energy; Electric power; Grid; Population; Peak demand; Power demand; Environmental science; Power (physics); Engineering; Automotive engineering; Electricity; Electrical engineering; Mathematics; Power consumption","score_opus":0.09946719576344583,"score_gpt":0.3411121605336217,"score_spread":0.24164496477017589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734352835","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9750155,0.00038774518,0.018631296,0.005383877,0.000021496768,0.00046558827,0.0000051462966,0.0000102385075,0.00007906511],"genre_scores_gemma":[0.99880457,0.00030853372,0.00051455677,0.00009732123,0.000055885175,0.00013686987,0.000015528076,0.000011095253,0.000055637727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890316,0.0002505833,0.00022611597,0.00013717647,0.00024047577,0.0002424722],"domain_scores_gemma":[0.9994612,0.00017258688,0.000005684045,0.00016110842,0.00016102214,0.000038400638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020591132,0.00006509023,0.00011191908,0.00019301666,0.000099675344,0.000051527215,0.00015241702,0.000032193653,0.000010438113],"category_scores_gemma":[0.00023304854,0.00004676889,0.000020133913,0.00035599258,0.00003487316,0.0001680341,0.00004081789,0.0000858242,0.0000014000476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006624655,0.000009616913,0.00018799354,0.000049149123,0.000012462867,9.464908e-7,0.0011792864,0.59438443,0.40031034,0.000048556194,0.0036220371,0.00012892396],"study_design_scores_gemma":[0.00015259067,0.00014036901,0.0013384894,0.000010233081,0.0000022700785,6.755528e-7,0.00009557068,0.57899636,0.41843247,0.000024061788,0.00076725805,0.00003962249],"about_ca_topic_score_codex":0.00021920138,"about_ca_topic_score_gemma":0.00018648242,"teacher_disagreement_score":0.023789026,"about_ca_system_score_codex":0.000010848316,"about_ca_system_score_gemma":0.000020905709,"threshold_uncertainty_score":0.19071801},"labels":[],"label_agreement":null},{"id":"W2734395059","doi":"","title":"Energy in the Afermath of the 2003 Electricity Blackout - U.S. Speaker","year":2005,"lang":"en","type":"article","venue":"Canada-United States law journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Telecommunications; Energy (signal processing); Computer science; Engineering; Electrical engineering; Physics; Power (physics); Electric power system","score_opus":0.004862522098802128,"score_gpt":0.1685724485338995,"score_spread":0.16370992643509735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734395059","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92181903,0.0024733318,0.0051015047,0.006075146,0.0022393474,0.00032965717,0.000080335405,0.00010051776,0.061781134],"genre_scores_gemma":[0.9965487,0.00034578086,0.00008051419,0.0026128385,0.00019789944,0.000004633684,0.0000132461055,0.00002535186,0.0001710508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99861324,0.00012593587,0.00035916027,0.00008198402,0.00042999172,0.00038971],"domain_scores_gemma":[0.99940366,0.00006112597,0.00007693587,0.00027662184,0.00010254911,0.000079105295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029139456,0.00015973081,0.00014886333,0.0001261981,0.00015508036,0.000047478563,0.0005157071,0.00003710458,0.00007588004],"category_scores_gemma":[0.000021937085,0.00010147694,0.00004349617,0.0010784104,0.000051033254,0.0000994198,0.0000322081,0.00040336134,0.000001199034],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055517326,0.000021092823,0.0003335306,0.000010394586,0.000072530966,0.000041420582,0.00025388994,0.84637034,0.000055752258,0.011089667,0.14062558,0.0011202729],"study_design_scores_gemma":[0.0003117785,0.000011447613,0.00246332,0.000023875811,0.000020286785,0.0000722282,0.00025730813,0.096514925,0.0014334663,0.00017279279,0.89856595,0.00015265131],"about_ca_topic_score_codex":0.14780559,"about_ca_topic_score_gemma":0.8230881,"teacher_disagreement_score":0.75794035,"about_ca_system_score_codex":0.0004239885,"about_ca_system_score_gemma":0.00012342709,"threshold_uncertainty_score":0.85786927},"labels":[],"label_agreement":null},{"id":"W2735003951","doi":"10.1016/j.enpol.2017.07.019","title":"On the influence of jurisdiction on the profitability of residential photovoltaic-storage systems: A multi-national case study","year":2017,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profitability index; Photovoltaic system; Jurisdiction; Environmental economics; Subsidy; Electricity; Incentive; Business; Cost of electricity by source; Grid; Net metering; Feed-in tariff; Finance; Renewable energy; Energy policy; Economics; Distributed generation; Electricity generation; Microeconomics; Engineering; Power (physics); Electrical engineering; Market economy","score_opus":0.02565516114854798,"score_gpt":0.2765555524886427,"score_spread":0.25090039134009473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2735003951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962931,0.000010373282,0.00020625727,0.00013278962,0.00027787383,0.0003120296,0.00001633038,0.000051968527,0.0026992601],"genre_scores_gemma":[0.99928564,0.0000043127807,0.000009880142,0.000040253602,0.00021951046,0.00020167934,0.0000011557116,0.000020867501,0.0002166738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99877834,0.00014584081,0.00031431124,0.00017021681,0.000433135,0.0001581651],"domain_scores_gemma":[0.9985456,0.00021959296,0.00017216205,0.000917653,0.000113942995,0.00003107973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006045331,0.00014840793,0.00015851436,0.00013462662,0.00025330525,0.00004538214,0.00039722206,0.000045552202,0.000009031408],"category_scores_gemma":[0.0005079124,0.00009619503,0.0000597967,0.0001269008,0.00011310457,0.00010514316,0.00010613361,0.00011375734,0.00000449015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001963752,0.00016287061,0.00082235894,0.00003256246,0.000116363626,0.000024133242,0.00060162845,0.94468415,0.0014448026,0.051284313,0.00077382394,0.00003335697],"study_design_scores_gemma":[0.0027127087,0.0007663841,0.53104854,0.00032923595,0.00014320835,0.0000748224,0.0030326617,0.42796186,0.028498258,0.0015643443,0.0031076553,0.00076031295],"about_ca_topic_score_codex":0.023811936,"about_ca_topic_score_gemma":0.001022545,"teacher_disagreement_score":0.5302262,"about_ca_system_score_codex":0.00017058614,"about_ca_system_score_gemma":0.000047632373,"threshold_uncertainty_score":0.9826886},"labels":[],"label_agreement":null},{"id":"W2737026469","doi":"10.1109/ptc.2017.7981250","title":"Economic dispatch in microgrids using compromise solution method","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Microgrid; Multi-objective optimization; Set (abstract data type); Compromise; Optimization problem; Time horizon; Pareto principle; Electric power system; Integer (computer science); Power (physics); Mathematics; Artificial intelligence","score_opus":0.023163655057743458,"score_gpt":0.28192491038929635,"score_spread":0.25876125533155286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2737026469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78985894,0.00003559272,0.19652323,0.00009725501,0.0009879866,0.00009840803,0.0000014747404,0.00014284221,0.012254294],"genre_scores_gemma":[0.9373332,0.00001709679,0.06231929,0.000013746678,0.00012410154,0.000008689139,0.0000024871447,0.000022209488,0.00015917743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994919,0.000011575718,0.00013834109,0.0001322496,0.000034032808,0.00019193703],"domain_scores_gemma":[0.99955404,0.000010417978,0.000023082139,0.0003775942,0.0000030206622,0.00003186482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016921922,0.00009489678,0.00011837894,0.00006503034,0.00007584836,0.00007912122,0.00019531682,0.000037961025,0.000072372844],"category_scores_gemma":[0.0000040288123,0.00010248442,0.000030972416,0.000014068801,0.000015212582,0.00018533281,0.00009668046,0.00005966274,0.000055382126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002533942,0.0000093879,0.011756782,0.000019814253,0.00002327156,0.000004215978,0.000027122713,0.97340995,0.006983238,0.0005426666,0.0009339264,0.0062870677],"study_design_scores_gemma":[0.0002893276,0.0000030045283,0.04800487,0.000010760526,0.0000066695025,0.0000015069112,0.000010305286,0.94353366,0.0049956953,0.00007276543,0.002941159,0.00013029206],"about_ca_topic_score_codex":0.001480434,"about_ca_topic_score_gemma":0.0012535731,"teacher_disagreement_score":0.14747429,"about_ca_system_score_codex":0.00022371899,"about_ca_system_score_gemma":0.0000047673375,"threshold_uncertainty_score":0.4179193},"labels":[],"label_agreement":null},{"id":"W2739544693","doi":"10.1016/j.apenergy.2017.07.058","title":"Transactive control of fast-acting demand response based on thermostatic loads in real-time retail electricity markets","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"SLAC National Accelerator Laboratory; Pacific Institute for Climate Solutions; Natural Resources Canada; U.S. Department of Energy","keywords":"Demand response; Transactive memory; Electricity; Smart grid; Grid; Control (management); Automotive engineering; Scheme (mathematics); Air conditioning; Peak demand; Computer science; Engineering; Electrical engineering; Mechanical engineering","score_opus":0.0070101492955236076,"score_gpt":0.19820897990688532,"score_spread":0.19119883061136173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2739544693","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77048373,0.000022505581,0.102680884,0.000104799125,0.0001367975,0.0002605059,0.000010460566,0.00022286501,0.12607749],"genre_scores_gemma":[0.99927247,0.00002997142,0.00028747533,0.00006688291,0.000032057982,0.00010189447,0.0000049036,0.000061471175,0.00014288483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867207,0.00011173074,0.00031959076,0.00027662917,0.00024395801,0.00037602626],"domain_scores_gemma":[0.9986211,0.00050976046,0.00012808664,0.0006538714,0.000020911715,0.000066283574],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005848749,0.0002554079,0.0003876305,0.00020957866,0.00009368251,0.000033986085,0.00031744575,0.00010390904,0.000090088346],"category_scores_gemma":[0.000056478024,0.0002572501,0.00006832725,0.00013972647,0.000052200132,0.00007589494,0.0000159314,0.00014038551,0.000008564092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030709982,0.000081695616,0.00008737661,0.000039631177,0.0001166042,0.000027831724,0.00013452157,0.8467591,0.123934515,0.0006844132,0.000092502545,0.02497086],"study_design_scores_gemma":[0.0033603623,0.00013089154,0.027889859,0.00006795224,0.00004961869,5.6657944e-7,0.000038277947,0.85871756,0.10834865,0.0002332722,0.00074656855,0.00041641292],"about_ca_topic_score_codex":0.00017391263,"about_ca_topic_score_gemma":0.00004434061,"teacher_disagreement_score":0.22878875,"about_ca_system_score_codex":0.000163533,"about_ca_system_score_gemma":0.000027041842,"threshold_uncertainty_score":0.99998796},"labels":[],"label_agreement":null},{"id":"W2740543750","doi":"10.24963/ijcai.2017/52","title":"Multiple-Profile Prediction-of-Use Games","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Convexity; Computer science; Incentive; Tariff; Electricity; Operations research; Mathematical optimization; Microeconomics; Economics; Engineering; Mathematics","score_opus":0.021329947205590668,"score_gpt":0.20746284894968584,"score_spread":0.18613290174409516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740543750","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7545872,0.000051173207,0.02382376,0.00006386343,0.0027087552,0.00018942515,0.00003764134,0.0008936853,0.21764451],"genre_scores_gemma":[0.9930669,0.000029826451,0.0032516632,0.0000088991865,0.000105353196,0.00001690168,0.0000060379452,0.000016464335,0.0034979552],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99962413,0.0000028875968,0.00010521321,0.00007866004,0.000082533756,0.00010655746],"domain_scores_gemma":[0.99940234,0.000025103125,0.000020445194,0.0005057688,0.000016416774,0.000029947223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004041323,0.00006695593,0.000074664335,0.000037019356,0.000055368382,0.000044125212,0.00017026834,0.00002759347,0.00022391095],"category_scores_gemma":[0.000063708394,0.000062530635,0.000030046687,0.00001715096,0.00002677159,0.0002309914,0.000057146153,0.00003551205,0.000060207673],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011017053,0.000054303888,0.49670163,0.00016224605,0.00032054156,0.000010697805,0.00016984425,0.27628657,0.009991398,0.0063120876,0.19594201,0.014037659],"study_design_scores_gemma":[0.00032402852,0.000012430304,0.59266824,0.00001617595,0.000012057249,5.5603994e-7,0.000022840242,0.32268807,0.018648818,0.000029648636,0.06547675,0.000100405625],"about_ca_topic_score_codex":0.0001015391,"about_ca_topic_score_gemma":0.0000337011,"teacher_disagreement_score":0.23847972,"about_ca_system_score_codex":0.000014548224,"about_ca_system_score_gemma":0.0000020288862,"threshold_uncertainty_score":0.2549925},"labels":[],"label_agreement":null},{"id":"W2742356686","doi":"10.1109/isie.2017.8001468","title":"Evaluation of meta-heuristic optimization methods for home energy management applications","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Particle swarm optimization; Heuristics; Mathematical optimization; Optimization problem; Heuristic; Meta heuristic; Multi-swarm optimization; Reduction (mathematics); Variable (mathematics); Computation; Metaheuristic; Algorithm; Artificial intelligence; Mathematics","score_opus":0.08083907663058784,"score_gpt":0.3616350605034523,"score_spread":0.2807959838728644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742356686","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001490525,0.00025398462,0.94166845,0.000044740096,0.00023894376,0.00046480994,0.000004709815,0.000110507215,0.05719898],"genre_scores_gemma":[0.16298509,0.00015741885,0.8320198,0.000018467572,0.000079739795,0.0037782795,0.000050634277,0.000039654788,0.00087092386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992038,0.000047601,0.0002248254,0.0001608556,0.00024036795,0.00012252826],"domain_scores_gemma":[0.99895465,0.00004862274,0.00008261796,0.0006939552,0.00019062664,0.000029544912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012555742,0.00011212208,0.00018157143,0.000111589485,0.00011078286,0.0000429362,0.00027144788,0.00003243236,0.00018110349],"category_scores_gemma":[0.000035245692,0.00010608216,0.00009517438,0.00006168365,0.000021099871,0.00011972412,0.000063386666,0.000016889635,0.0000019785286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010946891,0.000013755304,0.0000016648515,0.00004894291,0.0009400421,3.0034336e-8,0.000003909587,0.868427,0.000037084625,0.058677852,0.0006101144,0.07123851],"study_design_scores_gemma":[0.0003317389,0.000008184583,0.00023358373,0.0000027138083,0.0030007453,1.3212882e-7,0.000007582628,0.9653264,0.0015243692,0.0060201297,0.023431852,0.00011255301],"about_ca_topic_score_codex":0.000017447677,"about_ca_topic_score_gemma":0.0000075608614,"teacher_disagreement_score":0.16297019,"about_ca_system_score_codex":0.000070574446,"about_ca_system_score_gemma":0.000005693023,"threshold_uncertainty_score":0.43259048},"labels":[],"label_agreement":null},{"id":"W2743369941","doi":"10.1016/j.apenergy.2017.07.099","title":"<mml:math xmlns:mml=\"http://www.w3.org/1998/Math/MathML\" altimg=\"si2.gif\" overflow=\"scroll\"><mml:mrow><mml:msub><mml:mrow><mml:mi mathvariant=\"script\">H</mml:mi></mml:mrow><mml:mrow><mml:mn>2</mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math>-optimal transactive control of electric power regulation from fast-acting demand response in the presence of high renewables","year":2017,"lang":"lv","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"SLAC National Accelerator Laboratory; Pacific Northwest National Laboratory; U.S. Department of Energy; Pacific Institute for Climate Solutions; Laboratory Directed Research and Development; Office of Science; Battelle","keywords":"Schedule; Computer science; Algorithm; Controller (irrigation); Operations research; Mathematics; Operating system; Biology","score_opus":0.010541717716146487,"score_gpt":0.20931634567807966,"score_spread":0.19877462796193318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743369941","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48168284,0.00093883177,0.01193134,0.00043333464,0.0018322739,0.000050985782,0.00021165008,0.0001682815,0.50275046],"genre_scores_gemma":[0.9914756,0.0009748193,0.0026580954,0.00062900025,0.0012817447,0.0013745354,0.0005725912,0.0007482268,0.00028542138],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99080414,0.0006340268,0.002058658,0.0017393907,0.002476714,0.002287075],"domain_scores_gemma":[0.9911229,0.0025953914,0.002362419,0.0031270722,0.00015677465,0.0006354135],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002672259,0.000935053,0.00047267327,0.0007162273,0.0012265875,0.0010837612,0.0026417281,0.0020066118,0.33208317],"category_scores_gemma":[0.0013146992,0.0017440733,0.0012297558,0.0011428632,0.0011501358,0.0015005112,0.0010809193,0.0012194574,0.00026993654],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008805682,0.00045224282,0.000012724268,0.0009794559,0.0033616943,0.0010125794,0.0042348043,0.22746417,0.04196031,0.53824496,0.17038111,0.0030902599],"study_design_scores_gemma":[0.0027460577,0.0010499894,0.0005807171,0.0007788162,0.0011915647,0.0002116756,0.0016929281,0.17136987,0.81702596,0.000097034215,0.002009172,0.0012462417],"about_ca_topic_score_codex":0.0075210035,"about_ca_topic_score_gemma":0.0025662945,"teacher_disagreement_score":0.7750656,"about_ca_system_score_codex":0.000029892939,"about_ca_system_score_gemma":0.0009601035,"threshold_uncertainty_score":0.9999532},"labels":[],"label_agreement":null},{"id":"W2743490277","doi":"10.1109/cjece.2017.2716780","title":"Optimization and Energy Management in Smart Home Considering Photovoltaic, Wind, and Battery Storage System With Integration of Electric Vehicles","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Renewable energy; Energy management; Energy storage; Computer science; Smart grid; Battery (electricity); Heuristic; Wind power; Electricity; Integer programming; Automotive engineering; Energy management system; Reduction (mathematics); Linear programming; Environmental economics; Mathematical optimization; Energy (signal processing); Engineering; Power (physics); Electrical engineering; Mathematics; Algorithm","score_opus":0.0046944286467087435,"score_gpt":0.1488205462439405,"score_spread":0.14412611759723176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743490277","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6224093,0.0009774611,0.37635705,0.00001670154,0.00012653561,0.000042302454,4.9922505e-7,0.000014180599,0.000056005272],"genre_scores_gemma":[0.9949926,0.00019920348,0.004715869,0.000010338166,0.000057856003,0.0000021815063,5.983578e-7,0.0000173027,0.0000040621935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938464,0.000009643387,0.00022770205,0.00010270559,0.000078841,0.00019646884],"domain_scores_gemma":[0.9996132,0.000030488503,0.00006615169,0.00009324684,0.000029713017,0.00016717863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009886348,0.00012890638,0.00021778797,0.00050018536,0.00005496699,0.00010629201,0.000085198866,0.000039555132,5.5616806e-7],"category_scores_gemma":[0.0000051017814,0.00012164072,0.000015018223,0.00012119327,0.000018886283,0.0001852068,0.000017823199,0.000120083634,3.407062e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071366703,0.0000031929433,0.0039094193,0.00012372412,0.00008776217,0.00017138186,0.00005747585,0.98593843,0.00057446,0.000991134,0.000024076802,0.00811183],"study_design_scores_gemma":[0.00041201772,0.000088008186,0.04742521,0.00021698145,0.000022785227,0.00013888671,0.000010442043,0.9509459,0.00047760652,0.0000057354346,0.00012664904,0.00012979125],"about_ca_topic_score_codex":0.00038400543,"about_ca_topic_score_gemma":0.00029060798,"teacher_disagreement_score":0.37258333,"about_ca_system_score_codex":0.00010755499,"about_ca_system_score_gemma":0.000019550822,"threshold_uncertainty_score":0.49603644},"labels":[],"label_agreement":null},{"id":"W2744241643","doi":"10.1109/cjece.2016.2583923","title":"Energy Trading in the Smart Grid: A Distributed Game-Theoretic Approach","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Grid; Electricity; Energy (signal processing); Distributed generation; Game theory; Convergence (economics); Distributed computing; Order (exchange); Mathematical optimization; Microeconomics; Business; Economics; Engineering; Electrical engineering; Mathematics","score_opus":0.006182305367519883,"score_gpt":0.15773778429261467,"score_spread":0.1515554789250948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2744241643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17266467,0.0016222275,0.8232694,0.00028561478,0.0010817961,0.0000728985,0.0000040239497,0.00003505989,0.0009643039],"genre_scores_gemma":[0.9987327,0.000049671587,0.0006716697,0.00005281636,0.00046696758,0.0000038886587,0.0000022439199,0.000016950922,0.000003127341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992173,0.00001666359,0.00022425277,0.00009071274,0.0001044205,0.00034666146],"domain_scores_gemma":[0.99947214,0.000059152742,0.000039725976,0.00017875654,0.000017375449,0.00023286058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001987313,0.00013808497,0.00019024788,0.00023944564,0.00008314494,0.00021823181,0.0004392009,0.00004820912,0.000002819434],"category_scores_gemma":[0.000024939645,0.00011037105,0.000054827244,0.00015107654,0.000028824306,0.00012268688,0.000013847615,0.00027397013,2.6603513e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074491036,0.000025569205,0.0041513243,0.0000842086,0.0001806189,0.00074301695,0.00053443736,0.9198845,0.00005677854,0.041827936,0.0058907093,0.026613453],"study_design_scores_gemma":[0.0002512098,0.000045574452,0.023993356,0.000034945086,0.000015434489,0.00022438364,0.0000059132244,0.9614632,0.000027737038,0.00020317991,0.013589476,0.00014556297],"about_ca_topic_score_codex":0.00027522075,"about_ca_topic_score_gemma":0.00020395055,"teacher_disagreement_score":0.826068,"about_ca_system_score_codex":0.00010362237,"about_ca_system_score_gemma":0.000033819633,"threshold_uncertainty_score":0.4500801},"labels":[],"label_agreement":null},{"id":"W2745523508","doi":"10.1007/978-3-319-61813-5_6","title":"Scheduling Domestic Shiftable Loads in Smart Grids: A Learning Automata-Based Scheme","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Learning automata; Computer science; Subnet; Potential game; Mathematical optimization; Scheduling (production processes); Nash equilibrium; Automaton; Distributed computing; Game theory; Algorithmic game theory; Subgame perfect equilibrium; Theoretical computer science; Repeated game; Mathematics; Mathematical economics","score_opus":0.018709116353220555,"score_gpt":0.2344755132125607,"score_spread":0.21576639685934013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2745523508","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012606937,0.0005636136,0.990345,0.00030633635,0.00095997483,0.00050083234,0.00002248539,0.00022329146,0.0058177467],"genre_scores_gemma":[0.07116805,0.00014991277,0.9282044,0.00005711523,0.00016796442,0.000052112042,0.000062363666,0.00004864791,0.00008941963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878633,0.000007405156,0.0005636385,0.00013098436,0.00022249878,0.00028911434],"domain_scores_gemma":[0.99885434,0.0002077114,0.00025571225,0.0005761539,0.00006364414,0.000042419848],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004416348,0.0003106281,0.0003997545,0.00032538222,0.0006584697,0.00022244114,0.0012524781,0.00020512988,0.0000016204589],"category_scores_gemma":[0.00009208745,0.0002855496,0.00014454823,0.00012568074,0.00027623604,0.00028587124,0.00040748777,0.00059406826,0.0000011464186],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.320179e-7,0.0000055919263,0.000016796943,0.00034870591,0.000053375446,2.4685798e-7,0.00023954269,0.9918945,0.000005603637,0.003755843,0.000017306511,0.0036615618],"study_design_scores_gemma":[0.00028308723,0.000025173633,0.000095377574,0.0005078408,0.00003375223,0.0000030871722,0.0000021142625,0.970702,0.000032883705,0.00021203002,0.027806163,0.00029649772],"about_ca_topic_score_codex":0.000042615167,"about_ca_topic_score_gemma":0.00013005744,"teacher_disagreement_score":0.06990735,"about_ca_system_score_codex":0.00013337778,"about_ca_system_score_gemma":0.00010401979,"threshold_uncertainty_score":0.99995965},"labels":[],"label_agreement":null},{"id":"W2749155099","doi":"10.1109/fuzz-ieee.2017.8015650","title":"A graph-based semi-supervised learning approach towards household energy disaggregation","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Graph; Machine learning; Artificial intelligence; Theoretical computer science","score_opus":0.020681605929176693,"score_gpt":0.19911665889016053,"score_spread":0.17843505296098383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749155099","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098059975,0.000119766075,0.63639486,0.00019078964,0.00075190456,0.00013962065,0.0000031810218,0.002075458,0.26226446],"genre_scores_gemma":[0.99486727,0.00004700592,0.0031566569,0.000088671586,0.0001927119,0.00007804668,0.000043236152,0.000071722636,0.0014546668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989784,0.000024543531,0.00018022028,0.00025582622,0.00025125427,0.00030980256],"domain_scores_gemma":[0.99913925,0.000013854724,0.000046667057,0.0006878566,0.000020251333,0.00009209919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014416412,0.00021680056,0.00017652308,0.00013449915,0.00028272226,0.00022309051,0.0004030052,0.000086918866,0.000057565525],"category_scores_gemma":[0.00002947978,0.00020849003,0.00009918761,0.00009806138,0.000047025485,0.00026483487,0.0000818826,0.0001336092,0.000010292879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048867514,0.000025756632,0.0018129626,0.000046528396,0.000054647528,0.0000040908426,0.00003622408,0.981705,0.00042871851,0.0027023535,0.0021690137,0.011009789],"study_design_scores_gemma":[0.0006296101,0.000022174214,0.008603036,0.000022984344,0.000025929336,0.0000010067649,0.00003582751,0.96186,0.0053111752,0.00009915777,0.023041729,0.000347355],"about_ca_topic_score_codex":0.00034095012,"about_ca_topic_score_gemma":0.000045050736,"teacher_disagreement_score":0.8968073,"about_ca_system_score_codex":0.00006650183,"about_ca_system_score_gemma":0.00001102809,"threshold_uncertainty_score":0.8501977},"labels":[],"label_agreement":null},{"id":"W2749664490","doi":"10.1109/tpwrs.2017.2741920","title":"Optimal Regulation of Virtual Power Plants","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Advanced Research Projects Agency - Energy; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Dispatchable generation; Distributed generation; Computer science; Mathematical optimization; Convergence (economics); Virtual power plant; AC power; Optimization problem; Distributed computing; Control engineering; Linear programming; Engineering; Voltage; Renewable energy; Mathematics","score_opus":0.011368927035735985,"score_gpt":0.21113665447886784,"score_spread":0.19976772744313187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749664490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18194637,0.000036687325,0.79406464,0.000018870598,0.008597135,0.00019866595,0.000043905733,0.00022157055,0.014872185],"genre_scores_gemma":[0.99832445,0.000012668262,0.00009011463,0.000004321955,0.00002274203,0.000034330344,0.0000019424233,0.000039180446,0.0014702571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990776,0.000020450374,0.00028451343,0.0001673828,0.0002588304,0.00019118903],"domain_scores_gemma":[0.9990963,0.000025154588,0.00007819952,0.0007088433,0.0000312017,0.000060297967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012801064,0.00016020525,0.00020328302,0.00014755518,0.00015467408,0.0000704094,0.0002481079,0.00009411625,0.00011680893],"category_scores_gemma":[0.0000019475951,0.00016595845,0.00008112914,0.000042190935,0.000041958465,0.00023726856,0.0000014058108,0.00011241974,0.00010147409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002283838,0.000037784812,0.000011922276,0.000025389429,0.00012515014,0.0000036363683,0.00020755646,0.99351966,0.003664545,0.00020472148,0.0020052716,0.00017154969],"study_design_scores_gemma":[0.003214728,0.00082818855,0.019028597,0.00078292476,0.00015855183,0.000064225955,0.0011902519,0.7509767,0.17045687,0.000015227672,0.051763553,0.0015202113],"about_ca_topic_score_codex":0.000059891026,"about_ca_topic_score_gemma":0.000013332884,"teacher_disagreement_score":0.81637806,"about_ca_system_score_codex":0.000073220646,"about_ca_system_score_gemma":0.000007746368,"threshold_uncertainty_score":0.6767589},"labels":[],"label_agreement":null},{"id":"W2750448831","doi":"10.1016/j.apenergy.2017.08.094","title":"Non-intrusive load monitoring under residential solar power influx","year":2017,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"National Science Foundation of Sri Lanka","keywords":"Renewable energy; Solar power; Photovoltaic system; Scalability; Cluster analysis; Computer science; Load profile; Real-time computing; Power (physics); Engineering; Electricity; Automotive engineering; Electrical engineering; Artificial intelligence; Database","score_opus":0.00755614726628751,"score_gpt":0.21060137822892389,"score_spread":0.20304523096263638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750448831","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45625377,0.00019740753,0.05170384,0.00023193577,0.008084959,0.00017946704,0.0000035548735,0.0009563349,0.48238873],"genre_scores_gemma":[0.99721074,0.000088303714,0.0004765502,0.00006859515,0.000974821,0.00008042759,0.0000043768587,0.00008846078,0.0010077514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986858,0.000004799288,0.00020163995,0.0003037208,0.00034754272,0.00045652973],"domain_scores_gemma":[0.99874467,0.00001742725,0.000066441164,0.0010183727,0.00003780872,0.000115304385],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009627805,0.00026493467,0.00021739422,0.00008556212,0.00031019884,0.00023342794,0.00058061554,0.00013125861,0.00009612553],"category_scores_gemma":[0.000009025497,0.00029498976,0.00006918889,0.000062323306,0.000059319453,0.00020525786,0.0003065414,0.00014854899,0.0001935668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030835377,0.000032157186,0.00055464887,0.000032068834,0.00039125394,0.00005430775,0.00020931584,0.90585077,0.029108623,0.040662438,0.019049527,0.0040240297],"study_design_scores_gemma":[0.0029378373,0.00006560128,0.09368604,0.00010402657,0.00015481334,0.000007972909,0.00039219626,0.01031952,0.52331704,0.006186714,0.36077225,0.0020559682],"about_ca_topic_score_codex":0.00032344283,"about_ca_topic_score_gemma":0.00009901089,"teacher_disagreement_score":0.8955313,"about_ca_system_score_codex":0.00021179461,"about_ca_system_score_gemma":0.000023558885,"threshold_uncertainty_score":0.99995023},"labels":[],"label_agreement":null},{"id":"W2750941888","doi":"10.1109/tsg.2017.2743760","title":"Incorporating Appliance Usage Patterns for Non-Intrusive Load Monitoring and Load Forecasting","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":160,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"National Science Foundation","keywords":"Computer science; A priori and a posteriori; Identification (biology); Load management; Data mining; Fuzzy logic; Demand response; Set (abstract data type); AC power; Smart meter; Smart grid; Real-time computing; Engineering; Artificial intelligence; Electricity; Voltage","score_opus":0.02814137677123594,"score_gpt":0.24298111804236294,"score_spread":0.214839741271127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750941888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2702303,0.00002687819,0.72219443,0.00006608622,0.0053282976,0.00046081666,0.00006429515,0.00023207738,0.0013968108],"genre_scores_gemma":[0.9936321,0.00006270212,0.004681838,0.00001923894,0.00088066765,0.0004066271,0.0000022453912,0.000076634315,0.00023798454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986577,0.000009624037,0.0002927286,0.00036883287,0.0002709056,0.00040019338],"domain_scores_gemma":[0.9990195,0.00010534606,0.00010727641,0.00056076143,0.0000872405,0.00011989183],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002510309,0.00029309542,0.00025600655,0.000083004445,0.0007893718,0.00022593631,0.00027683118,0.00009468222,0.000010363321],"category_scores_gemma":[0.000015748832,0.00032754894,0.00009550016,0.00006473566,0.000056609595,0.00040971595,0.0000072641997,0.00025084944,0.000018770286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009917075,0.00008810602,0.00677631,0.0007212743,0.00036833575,0.00004744608,0.0007342038,0.8605484,0.008734602,0.00003035877,0.00075037515,0.12110144],"study_design_scores_gemma":[0.0035333587,0.00028432554,0.0142221525,0.0010195473,0.00024378186,0.000034541357,0.00042765288,0.72890913,0.2411031,0.00017403164,0.008456794,0.0015916101],"about_ca_topic_score_codex":0.00017000605,"about_ca_topic_score_gemma":0.00026690413,"teacher_disagreement_score":0.7234018,"about_ca_system_score_codex":0.00028064358,"about_ca_system_score_gemma":0.00002816794,"threshold_uncertainty_score":0.9999177},"labels":[],"label_agreement":null},{"id":"W2751369376","doi":"10.3166/ria.31.427-448","title":"Ajustement diffus et adaptatif de la consommation électrique résidentielle par un systéme multi-agent auto-adaptatif","year":2017,"lang":"fr","type":"article","venue":"Revue d intelligence artificielle","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Medicine","score_opus":0.03960528175842511,"score_gpt":0.284034775776138,"score_spread":0.2444294940177129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751369376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048977684,0.0055968286,0.92133826,0.0038656725,0.0050570755,0.0010567271,0.000040944673,0.00038172066,0.013685068],"genre_scores_gemma":[0.9500717,0.0046978304,0.026658336,0.00014954935,0.0003989614,0.00028588148,0.000034811994,0.0001586587,0.017544292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99582505,0.0005742396,0.0012366887,0.0008154944,0.00043858474,0.0011099468],"domain_scores_gemma":[0.9965809,0.00048334085,0.00052662875,0.0018872624,0.00016603318,0.00035582768],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0020939463,0.0006631086,0.00061641994,0.0002358002,0.0009379028,0.00092398684,0.0011269023,0.00040063134,0.0010404137],"category_scores_gemma":[0.00057485985,0.0008012979,0.00031841022,0.0002590038,0.0004161313,0.00063357246,0.0004338183,0.0007169222,0.0016695528],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021289963,0.0005095299,0.0006279798,0.000794323,0.00031313687,0.00022800946,0.0051337667,0.888581,0.005344891,0.053515054,0.0037848745,0.041146174],"study_design_scores_gemma":[0.00027889074,0.000099551304,0.003036098,0.0007940463,0.00018308239,0.0000572782,0.001710535,0.8715235,0.07377706,0.001976204,0.045841854,0.000721872],"about_ca_topic_score_codex":0.0026194577,"about_ca_topic_score_gemma":0.0005576534,"teacher_disagreement_score":0.901094,"about_ca_system_score_codex":0.0009326784,"about_ca_system_score_gemma":0.00017617315,"threshold_uncertainty_score":0.99987274},"labels":[],"label_agreement":null},{"id":"W2751838336","doi":"10.1109/tia.2017.2750633","title":"Testing the Performance of Bus-Split Aggregation Method for Residential Loads","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Sensitivity (control systems); Power (physics); Metre; Automotive engineering; Computer science; Energy storage; Electricity meter; Engineering; Electronic engineering","score_opus":0.0357871428345641,"score_gpt":0.2830976751381507,"score_spread":0.2473105323035866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751838336","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043999195,0.000009078027,0.95266855,0.00031411584,0.0003386288,0.00061482337,0.000047362664,0.0001438181,0.0018644357],"genre_scores_gemma":[0.97917926,0.000010817994,0.018290434,0.00002089818,0.00020222944,0.0018380986,0.0000042222737,0.000030067054,0.00042394325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925715,0.000014494978,0.00024953586,0.00017142466,0.00013981975,0.0001675899],"domain_scores_gemma":[0.9987688,0.00018691711,0.00010675052,0.00080805697,0.00008989086,0.000039552837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023432828,0.00012366245,0.00010961705,0.00007745836,0.0007734032,0.00006300182,0.0004216163,0.00015420295,0.000027197422],"category_scores_gemma":[0.00001063865,0.000115517774,0.000061851424,0.00017169458,0.00007277901,0.00017488174,0.0000025222425,0.0003351062,0.0000120559425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007679668,0.000034181656,0.00006595049,0.00006134515,0.00006261657,7.029581e-8,0.00003602148,0.9132645,0.0058199163,0.0004939233,0.00049844186,0.07965532],"study_design_scores_gemma":[0.00054015656,0.000067356385,0.009420538,0.00009117713,0.00020058065,0.0000061099936,0.000085424464,0.6818121,0.29084182,0.00026264225,0.016376674,0.00029541893],"about_ca_topic_score_codex":0.000060937524,"about_ca_topic_score_gemma":0.000020114738,"teacher_disagreement_score":0.93518007,"about_ca_system_score_codex":0.000057006397,"about_ca_system_score_gemma":0.000022529435,"threshold_uncertainty_score":0.594847},"labels":[],"label_agreement":null},{"id":"W2754461651","doi":"10.1109/tpwrs.2018.2804353","title":"Setpoint Tracking With Partially Observed Loads","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Setpoint; Control theory (sociology); News aggregator; Regret; Bernoulli's principle; Sublinear function; Computer science; Tracking (education); Mathematical optimization; Regular polygon; Mathematics; Engineering; Control (management); Artificial intelligence","score_opus":0.02129197608899595,"score_gpt":0.20139526829702517,"score_spread":0.18010329220802923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2754461651","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046198398,0.000052194948,0.93937814,0.000055718912,0.0058691157,0.00027406952,0.000011266543,0.0008543134,0.007306753],"genre_scores_gemma":[0.99859613,0.000008392422,0.0002139737,0.000060370265,0.00009560124,0.000114107745,0.0000015465188,0.00007980518,0.00083006924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874717,0.000038531936,0.00029711882,0.0002634611,0.00029418844,0.00035955408],"domain_scores_gemma":[0.99926436,0.00003069768,0.00003334635,0.00048538754,0.00007453391,0.00011169794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015299009,0.0002450282,0.00022131835,0.00014349996,0.00013038857,0.00010632703,0.0001744028,0.00008401825,0.00013241102],"category_scores_gemma":[9.1284534e-7,0.00021967817,0.000072202114,0.00028953154,0.000054353,0.00019833731,7.293182e-7,0.00016988955,0.00035469266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040320025,0.0000613036,0.000030574527,0.00006548839,0.000259672,0.000021262904,0.00051098136,0.9944951,0.0017981919,0.00010711719,0.0022022645,0.00040775773],"study_design_scores_gemma":[0.003698233,0.0021377492,0.002873047,0.0011342772,0.0003899086,0.00018284346,0.001343143,0.5390836,0.19120164,0.000017794086,0.25538734,0.0025503892],"about_ca_topic_score_codex":0.0000704342,"about_ca_topic_score_gemma":0.00027519377,"teacher_disagreement_score":0.95239776,"about_ca_system_score_codex":0.00013752929,"about_ca_system_score_gemma":0.000016445902,"threshold_uncertainty_score":0.89582163},"labels":[],"label_agreement":null},{"id":"W2757802645","doi":"10.1109/tii.2017.2755465","title":"Demand-Side Management by Regulating Charging and Discharging of the EV, ESS, and Utilizing Renewable Energy","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":330,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Microgrid; Renewable energy; Electricity; Computer science; Energy storage; Energy management; Exploit; Demand response; Peak demand; Electricity generation; Environmental economics; Simulation; Power (physics); Engineering; Energy (signal processing); Electrical engineering; Economics","score_opus":0.022090065624755233,"score_gpt":0.2131819800310331,"score_spread":0.19109191440627787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757802645","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30607876,0.00017053398,0.64296216,0.00036120534,0.0037866673,0.00069735415,0.00006330878,0.00032396906,0.04555603],"genre_scores_gemma":[0.9985495,0.00027293531,0.00061605906,0.00003121795,0.000057297613,0.000026019034,0.0000017453376,0.000023651875,0.0004215335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989904,0.000017853234,0.00044392736,0.00009555641,0.00021392731,0.00023832553],"domain_scores_gemma":[0.9992487,0.000046935762,0.00017134564,0.00045589503,0.000014939488,0.000062211504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024125999,0.00018236513,0.00019815487,0.00010600437,0.00059905625,0.00016689177,0.00023064433,0.00010080718,0.000007709334],"category_scores_gemma":[0.0000073366123,0.00015712321,0.000046622208,0.00009336958,0.00009410684,0.00048279078,0.000013968957,0.00019691019,6.374156e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002051038,0.00002175906,0.00016573936,0.00024380526,0.00027423268,8.3394474e-7,0.00077416416,0.9400997,0.00066438067,0.00087182823,0.0019015773,0.054961447],"study_design_scores_gemma":[0.00283666,0.000053315325,0.0003225166,0.001045957,0.00029001472,0.000011333409,0.0029785438,0.82560796,0.14907555,0.00021952875,0.016934518,0.00062411453],"about_ca_topic_score_codex":0.00023129603,"about_ca_topic_score_gemma":0.000058534944,"teacher_disagreement_score":0.6924708,"about_ca_system_score_codex":0.000053755753,"about_ca_system_score_gemma":0.000007204543,"threshold_uncertainty_score":0.64072984},"labels":[],"label_agreement":null},{"id":"W2757965058","doi":"10.1109/sege.2017.8052785","title":"Economic analysis of commercial PV microgrids","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Battery (electricity); Tariff; Automotive engineering; Photovoltaic system; Computer science; Operating cost; Occupancy; Grid; Environmental science; Reliability engineering; Power (physics); Control (management); Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.009868899386692193,"score_gpt":0.22810654135633102,"score_spread":0.21823764196963882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757965058","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8652195,0.000022673474,0.0030223706,0.00008322869,0.00055087835,0.000029076233,0.0000074121153,0.00008771726,0.13097715],"genre_scores_gemma":[0.99901944,0.000028112143,0.0004903887,0.000018386168,0.00007503124,0.0000030622232,0.0000067737637,0.000009098324,0.00034972807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996707,0.0000029952562,0.00012414176,0.00007173402,0.000033669996,0.000096801836],"domain_scores_gemma":[0.999441,0.000008821957,0.000027228973,0.00049339625,0.000005296656,0.000024240595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000060135615,0.000062142804,0.00016259606,0.00012932414,0.00004338275,0.000032035932,0.00025033404,0.00002317045,0.0004758391],"category_scores_gemma":[0.0000028112331,0.00006346987,0.00009448919,0.00003470091,0.000027107691,0.00006882482,0.00006592201,0.000025129946,0.000054751068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021806106,0.000010570346,0.0687435,0.000011233502,0.0019151368,0.0000012540527,0.000033414824,0.9078365,0.0004164234,0.002923046,0.011936885,0.0061698416],"study_design_scores_gemma":[0.00015022814,0.0000060255547,0.71947783,0.0000018499318,0.00040209462,9.230578e-8,0.000011393215,0.2514776,0.0045370557,0.000016655913,0.023799581,0.00011958767],"about_ca_topic_score_codex":0.00038940998,"about_ca_topic_score_gemma":0.0012966084,"teacher_disagreement_score":0.65635896,"about_ca_system_score_codex":0.00003553732,"about_ca_system_score_gemma":0.0000023296634,"threshold_uncertainty_score":0.52101046},"labels":[],"label_agreement":null},{"id":"W2759253181","doi":"10.1109/sege.2017.8052813","title":"Database system design for energy economization of smart home energy services","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Lethbridge","funders":"","keywords":"Database; Computer science; Cloud computing; Smart grid; Work (physics); Energy management; Process (computing); Home automation; Energy management system; Facility management; Management system; Efficient energy use; Systems engineering; Energy (signal processing); Engineering; Telecommunications; Operating system","score_opus":0.01561421126280102,"score_gpt":0.19582279112727333,"score_spread":0.1802085798644723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2759253181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031384202,0.00009317317,0.9823934,0.000022973561,0.0009945204,0.00009029551,0.00002341417,0.0002579523,0.012985861],"genre_scores_gemma":[0.99094415,0.0000752311,0.007766852,0.000030533163,0.00017696017,0.00011272695,0.000067596855,0.0000433743,0.00078256754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993401,0.000012920793,0.00023575575,0.00016722635,0.00006924755,0.0001747423],"domain_scores_gemma":[0.9990921,0.000042736305,0.00008865242,0.0006893201,0.000037938673,0.000049267946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014365799,0.00013427797,0.00019157566,0.0000899684,0.00009772487,0.00006822294,0.00036281196,0.000047643156,0.00002271498],"category_scores_gemma":[0.0000041540216,0.00013498915,0.000045926776,0.00002686252,0.000014593768,0.0003377623,0.000083672094,0.000013835448,0.000005428682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026919444,0.000013875512,0.00017277448,0.0005980987,0.00015303378,0.000001692861,0.000016250997,0.8233414,0.00077582337,0.16965681,0.0034710667,0.0017722059],"study_design_scores_gemma":[0.0004787497,0.000027971942,0.00023026901,0.000055706623,0.0000335234,9.1279577e-7,0.00004481461,0.93444467,0.033635505,0.000101121994,0.030763919,0.00018283747],"about_ca_topic_score_codex":0.00067540223,"about_ca_topic_score_gemma":0.00054808456,"teacher_disagreement_score":0.9878057,"about_ca_system_score_codex":0.00006012119,"about_ca_system_score_gemma":0.0000075098837,"threshold_uncertainty_score":0.5504698},"labels":[],"label_agreement":null},{"id":"W2759331319","doi":"10.1109/sege.2017.8052811","title":"An online demand response EMS with anomaly usage detection","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Anomaly detection; Computer science; Outlier; Energy (signal processing); Data mining; Real-time computing; Artificial intelligence; Statistics","score_opus":0.014851360577406717,"score_gpt":0.2230655117861624,"score_spread":0.2082141512087557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2759331319","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9328743,0.000009662895,0.061297692,0.000050709263,0.00022753692,0.00006322557,0.0000014959824,0.00034784895,0.0051274933],"genre_scores_gemma":[0.9967106,0.0000068853296,0.0020087329,0.000027587625,0.00013102214,0.000009069182,0.0000028297627,0.000027331815,0.0010759397],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99952465,0.000019427316,0.00007965879,0.00013276147,0.00009462106,0.00014888334],"domain_scores_gemma":[0.9992799,0.000013692809,0.00001944946,0.0006128768,0.000013724792,0.00006035913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017009689,0.00009972782,0.00007749364,0.00006285371,0.0001398778,0.000108708075,0.00018305455,0.00003367764,0.00005158586],"category_scores_gemma":[0.0000150638825,0.00008272984,0.000014754535,0.000034261615,0.000024295505,0.00029202193,0.000025629533,0.000057235287,0.00002319048],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006868379,0.00010857137,0.017701851,0.000038975795,0.00016084344,0.00011388828,0.00016128397,0.87358665,0.08613546,0.0001477117,0.0007326566,0.020425262],"study_design_scores_gemma":[0.00047633526,0.00020906102,0.70058453,0.000010534939,0.00001813674,0.000008192198,0.00004626246,0.26058325,0.026345147,0.000012391484,0.011494594,0.00021158926],"about_ca_topic_score_codex":0.00009703325,"about_ca_topic_score_gemma":0.0020720216,"teacher_disagreement_score":0.68288267,"about_ca_system_score_codex":0.000037673508,"about_ca_system_score_gemma":0.00000373034,"threshold_uncertainty_score":0.33736253},"labels":[],"label_agreement":null},{"id":"W2760172647","doi":"10.1109/sege.2017.8052783","title":"Economic analysis of residential solar microgrids","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Photovoltaic system; Net metering; Battery (electricity); Renewable energy; Consumption (sociology); Electricity; Computer science; Automotive engineering; Environmental economics; Economics; Power (physics); Distributed generation; Engineering; Electrical engineering","score_opus":0.007156466980012376,"score_gpt":0.21610594705545158,"score_spread":0.2089494800754392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760172647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92874736,0.000043115855,0.006642063,0.000054376724,0.0007020216,0.000034699955,0.0000061348132,0.00010937901,0.06366085],"genre_scores_gemma":[0.99853,0.000045063727,0.00062928547,0.000006621402,0.00008201937,0.000002765975,0.0000054028956,0.000010421583,0.0006884643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99961436,0.0000035659946,0.00014129821,0.0000897878,0.000045398327,0.00010559498],"domain_scores_gemma":[0.99936664,0.0000069041334,0.000032622505,0.0005623955,0.000006449483,0.000024990135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007980332,0.00006334361,0.00015264952,0.0001697986,0.000047791305,0.00005335857,0.00026695296,0.000025636438,0.00054369547],"category_scores_gemma":[0.00000435924,0.000066089095,0.00010649982,0.00003571267,0.000024677072,0.000107854066,0.0000759114,0.000026057758,0.000064148655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002750558,0.000007095949,0.02652033,0.000014790083,0.0025059243,0.0000030582785,0.000027077636,0.95497125,0.0022574435,0.0014726561,0.0107270125,0.001490599],"study_design_scores_gemma":[0.00024069741,0.000009542083,0.5502412,0.0000040637156,0.000901166,2.5141918e-7,0.00002253003,0.39274207,0.03963119,0.00005609868,0.015950197,0.00020099248],"about_ca_topic_score_codex":0.00056169485,"about_ca_topic_score_gemma":0.0014539426,"teacher_disagreement_score":0.56222916,"about_ca_system_score_codex":0.000033913933,"about_ca_system_score_gemma":0.000003319822,"threshold_uncertainty_score":0.5953084},"labels":[],"label_agreement":null},{"id":"W2760195126","doi":"10.1613/jair.1.11478","title":"On Overfitting and Asymptotic Bias in Batch Reinforcement Learning with Partial Observability","year":2019,"lang":"en","type":"preprint","venue":"Journal of Artificial Intelligence Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Samsung; Institut de Valorisation des Données; Waalse Gewest","keywords":"Overfitting; Observability; Reinforcement learning; Observable; Context (archaeology); Representation (politics); Computer science; Partially observable Markov decision process; Mathematics; Artificial intelligence; Mathematical optimization; Machine learning; Applied mathematics; Artificial neural network; Markov chain","score_opus":0.17795176204256294,"score_gpt":0.3636504415212668,"score_spread":0.18569867947870386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760195126","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9687118,0.00020606304,0.028276486,0.00022328125,0.0009309433,0.00043483434,7.054676e-7,0.000032161162,0.0011837339],"genre_scores_gemma":[0.998395,0.0005529851,0.00052627997,0.000009959233,0.00037922952,0.000017328486,0.000002423935,0.00004857258,0.00006821288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959942,0.00039754622,0.0011414881,0.00036793802,0.0014377552,0.00066103437],"domain_scores_gemma":[0.9978883,0.0008967522,0.00023365984,0.0004211747,0.00038812243,0.00017193587],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0062451796,0.0002920459,0.000544154,0.0007931626,0.00008957107,0.00026354217,0.00047351408,0.00021332879,0.0000891049],"category_scores_gemma":[0.0010583363,0.00025080665,0.000101616024,0.00047910432,0.00014472056,0.00016930244,0.00048511373,0.0035508936,0.00003879971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029961037,0.000059376333,0.0037691586,0.00036099672,0.0000926962,0.0000741755,0.00067470426,0.98003775,0.00015985587,0.0011527018,0.00006447169,0.01325452],"study_design_scores_gemma":[0.00010702099,0.0011444797,0.0022639036,0.0016980639,0.000023201215,0.000009981639,0.0013798631,0.98006845,0.0086259805,0.003841248,0.000486025,0.00035175876],"about_ca_topic_score_codex":0.0002029948,"about_ca_topic_score_gemma":0.00009668822,"teacher_disagreement_score":0.029683217,"about_ca_system_score_codex":0.0006913983,"about_ca_system_score_gemma":0.00020660824,"threshold_uncertainty_score":0.9999944},"labels":[],"label_agreement":null},{"id":"W2760450605","doi":"10.1109/sege.2017.8052802","title":"Using the thermal energy storage potential of residential homes for ToU rate savings and demand response","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Thermostat; Demand response; Peak demand; Load shifting; Schedule; Load management; Peaking power plant; Thermal energy storage; Thermal mass; Occupancy; Energy consumption; Thermal comfort; Computer science; Automotive engineering; Engineering; Electricity; Electrical engineering; Thermal; Architectural engineering; Distributed generation; Renewable energy","score_opus":0.014522755092653451,"score_gpt":0.23364329148571322,"score_spread":0.21912053639305978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760450605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90474665,0.000142605,0.09367593,0.00015152141,0.00050509686,0.000091377406,0.0000034634597,0.00004922831,0.0006341017],"genre_scores_gemma":[0.9979041,0.000035447327,0.0009933736,0.000027662389,0.00019404569,0.000010701837,0.0000010919478,0.00002796168,0.00080561184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938166,0.000049809994,0.00015635461,0.00012932396,0.000100100326,0.00018276335],"domain_scores_gemma":[0.9993928,0.00008414716,0.00006174571,0.0004011706,0.000027675434,0.000032434702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048077118,0.00011494146,0.000135313,0.00005841102,0.0002639854,0.00012950753,0.00023931278,0.00004355915,0.000027132803],"category_scores_gemma":[0.000057245914,0.00008625859,0.000053026823,0.000022864106,0.00008708142,0.00018592684,0.00014660392,0.000037351117,3.7957108e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007656971,0.0000137233865,0.0003686428,0.00007949714,0.00025183894,0.000019056415,0.00021581516,0.70982105,0.2814085,0.0026698876,0.00252579,0.001860502],"study_design_scores_gemma":[0.0020422242,0.000090889116,0.14780694,0.00005080737,0.00018400284,0.000009900072,0.00020723608,0.7370088,0.10401648,0.00043155483,0.0077384496,0.0004126982],"about_ca_topic_score_codex":0.00022149172,"about_ca_topic_score_gemma":0.000081804836,"teacher_disagreement_score":0.177392,"about_ca_system_score_codex":0.000020854473,"about_ca_system_score_gemma":0.000010138859,"threshold_uncertainty_score":0.3517523},"labels":[],"label_agreement":null},{"id":"W2765117811","doi":"10.3390/en10101640","title":"Transactive Demand Side Management Programs in Smart Grids with High Penetration of EVs","year":2017,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Institute for Information and Communications Technology Promotion; Ministry of Science, ICT and Future Planning","keywords":"Transactive memory; Computer science; Smart grid; Heuristic; Electricity; Demand response; Electric power system; Dynamic pricing; Electricity pricing; Distributed computing; Electricity market; Power (physics); Business; Engineering","score_opus":0.011144444121799484,"score_gpt":0.19161135166713197,"score_spread":0.18046690754533248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765117811","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9722042,0.00007650718,0.0046495935,0.000053761527,0.00026901698,0.00020598322,0.0000012727094,0.00012035861,0.02241932],"genre_scores_gemma":[0.9966428,0.0001281119,0.0027189185,0.0000052405944,0.000035577414,0.00011420726,0.000011404283,0.000025478903,0.0003182508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99928916,0.000012475212,0.00016920082,0.00015614898,0.00018300107,0.0001900059],"domain_scores_gemma":[0.99950856,0.000010308736,0.000047465215,0.00039050516,0.000017200677,0.00002595239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010152672,0.0001436548,0.00016333834,0.000110341265,0.000057939425,0.00005911737,0.00021384338,0.000036781534,0.000012333845],"category_scores_gemma":[0.0000023196928,0.00012935058,0.000027665725,0.00007500146,0.000060613962,0.00026407794,0.00002810935,0.00004765999,0.0000030604074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033356457,0.000040399053,0.004558171,0.0001388027,0.00014499617,0.000028556993,0.00029094127,0.9733486,0.0002944519,0.0052767624,0.000071094,0.01577383],"study_design_scores_gemma":[0.0029772695,0.00033833773,0.88977325,0.00045113906,0.00015839082,0.00000360433,0.0010747843,0.026027406,0.06928085,0.0009610811,0.008149044,0.0008048233],"about_ca_topic_score_codex":0.00032274748,"about_ca_topic_score_gemma":0.0014763492,"teacher_disagreement_score":0.94732124,"about_ca_system_score_codex":0.000050763032,"about_ca_system_score_gemma":0.0000045352253,"threshold_uncertainty_score":0.5274763},"labels":[],"label_agreement":null},{"id":"W2765353894","doi":"10.1016/j.ifacol.2017.08.1869","title":"Scalability through Decentralization: A Robust Control Approach for the Energy Management of a Building Community","year":2017,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"ETH Zürich Foundation; Eidgenössische Technische Hochschule Zürich; Schweizerischer Nationalfonds zur Förderung der Wissenschaftlichen Forschung; National Science Foundation","keywords":"Scalability; Decentralization; Scheme (mathematics); Computer science; Computation; Control (management); Energy management; Mathematical optimization; Decentralised system; Scale (ratio); Distributed computing; Microgrid; Operator (biology); Energy (signal processing); Operations research; Efficient energy use; Engineering; Mathematics; Economics; Artificial intelligence; Algorithm","score_opus":0.03486405324841404,"score_gpt":0.2538673081464007,"score_spread":0.21900325489798664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765353894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023115316,0.00044544003,0.9713309,0.00040989902,0.0004409719,0.0005370855,0.000054290183,0.00016604905,0.0035000492],"genre_scores_gemma":[0.72611284,0.00021240639,0.273074,0.00008849558,0.0001460668,0.00017749044,0.00004197836,0.000038223465,0.00010851201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988225,0.00006682524,0.00034438755,0.00020128363,0.0002239955,0.00034097076],"domain_scores_gemma":[0.9982731,0.00016329966,0.00012701903,0.0013158829,0.00007111491,0.000049630104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005027855,0.00023007649,0.0002985498,0.000028174807,0.000646152,0.00008438016,0.00089011557,0.000072481285,0.000022838643],"category_scores_gemma":[0.00005197948,0.00018392481,0.00014496174,0.00009560738,0.00016211654,0.00019443675,0.00017397675,0.0001472382,6.202844e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005234051,0.0001754412,0.0008864708,0.00045788338,0.00063214015,0.000001693746,0.00023098357,0.9762162,0.00026616672,0.015962029,0.000095416806,0.0050232485],"study_design_scores_gemma":[0.0020184084,0.000041802246,0.010530119,0.00006652106,0.00026652173,0.0000023151372,0.00055305316,0.9809391,0.0009321306,0.00026904405,0.004100561,0.00028040467],"about_ca_topic_score_codex":0.00039531785,"about_ca_topic_score_gemma":0.00010137206,"teacher_disagreement_score":0.7029975,"about_ca_system_score_codex":0.00009835871,"about_ca_system_score_gemma":0.000006975518,"threshold_uncertainty_score":0.7500236},"labels":[],"label_agreement":null},{"id":"W2765942258","doi":"10.23919/pscc.2018.8442447","title":"Optimal Ensemble Control of Loads in Distribution Grids with Network Constraints","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Optech (Canada)","funders":"","keywords":"Mathematical optimization; Flexibility (engineering); Computer science; Control theory (sociology); Demand response; Markov chain; Power (physics); Dual (grammatical number); Process (computing); Optimization problem; Control (management); Engineering; Mathematics; Electricity; Electrical engineering","score_opus":0.006053968758666626,"score_gpt":0.18989883924017067,"score_spread":0.18384487048150405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765942258","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14175868,0.00011320119,0.83818346,0.00003169864,0.0010279587,0.0003925454,0.00006453004,0.00024130601,0.018186597],"genre_scores_gemma":[0.99505395,0.00003707717,0.0041346424,0.000017050674,0.00036871663,0.00006930092,0.00021492364,0.000035436362,0.00006889451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998748,0.000029824545,0.00037884762,0.00027768835,0.00020045314,0.00036520488],"domain_scores_gemma":[0.9993499,0.000039411105,0.00007065135,0.0004181727,0.000063954976,0.000057904173],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002562215,0.00028010138,0.00042921474,0.000066377936,0.000014503953,0.000023906006,0.00021514394,0.00020605348,0.00018791866],"category_scores_gemma":[0.00000982874,0.00025794565,0.00006251756,0.00014422125,0.00014893911,0.00003919965,0.000158383,0.00029157934,0.000016243914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003643166,0.00001976927,0.0032599582,0.0001317887,0.00017495478,0.000011627084,0.000016957783,0.9876863,0.000023617706,0.0014932571,0.006646972,0.0004983595],"study_design_scores_gemma":[0.0025273496,0.0001886757,0.025432106,0.00075992686,0.00015993987,0.000008973993,0.000051318617,0.96235734,0.0021674072,0.00038874996,0.005045147,0.0009130449],"about_ca_topic_score_codex":0.00007164298,"about_ca_topic_score_gemma":0.00010794948,"teacher_disagreement_score":0.85329527,"about_ca_system_score_codex":0.0001686729,"about_ca_system_score_gemma":0.000037471626,"threshold_uncertainty_score":0.9999873},"labels":[],"label_agreement":null},{"id":"W2766179527","doi":"10.1109/iccpct.2017.8074204","title":"Energy usage analysis of industries with ETAP case study","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ciena (Canada); Mental Health Research Canada","funders":"","keywords":"Audit; Electric potential energy; Payback period; Energy (signal processing); Electrical equipment; Energy conservation; Efficient energy use; Computer science; Automotive engineering; Engineering; Operations management; Business; Electrical engineering; Accounting; Production (economics); Mathematics; Statistics; Economics","score_opus":0.020719974176493388,"score_gpt":0.23250313253950525,"score_spread":0.21178315836301187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766179527","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9628969,0.000011019003,0.006710598,0.000015293062,0.0000737735,0.00004340481,0.0000015783942,0.00008925509,0.030158209],"genre_scores_gemma":[0.99856156,0.0000043542436,0.00014535733,0.000006284254,0.000023041419,0.00001415013,0.000001993971,0.000013235665,0.0012300427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99948514,0.000010761328,0.00013268003,0.000118784155,0.00013526813,0.000117371135],"domain_scores_gemma":[0.9991682,0.00001713417,0.000040228588,0.0007110667,0.000025617128,0.000037722653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000071887574,0.000101730955,0.00020807234,0.00021167034,0.000093632545,0.00006769076,0.00017937184,0.000027640315,0.00012823509],"category_scores_gemma":[0.0000071116183,0.00007953205,0.000033002518,0.00026765166,0.000035330366,0.00015518026,0.00007488303,0.000042279884,0.0000014166574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004566061,0.000107319414,0.28539813,0.000010320605,0.006182572,0.0022846889,0.00043391236,0.6977364,0.000023139008,0.00068828155,0.0010604537,0.0060702097],"study_design_scores_gemma":[0.0021566725,0.00044265372,0.48254442,0.00002258529,0.007979039,0.00012015179,0.019939115,0.46791044,0.0066566397,0.000015552829,0.011131939,0.0010807847],"about_ca_topic_score_codex":0.0047266567,"about_ca_topic_score_gemma":0.013387098,"teacher_disagreement_score":0.22982596,"about_ca_system_score_codex":0.000017872211,"about_ca_system_score_gemma":0.0000050272774,"threshold_uncertainty_score":0.7470315},"labels":[],"label_agreement":null},{"id":"W2766900966","doi":"10.1109/iccpct.2017.8074195","title":"Comparison of smart grid development in five developed countries with focus on smart grid implementations in India","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Grid; Software deployment; Electricity; Computer science; Telecommunications; Implementation; Christian ministry; Computer security; Engineering; Systems engineering; Electrical engineering; Geography; Operating system; Political science; Software engineering","score_opus":0.024992013599370304,"score_gpt":0.2863821122505561,"score_spread":0.2613900986511858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766900966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9733055,0.000021528947,0.001045201,0.00018360095,0.0005531046,0.00043515812,0.000014367014,0.000092417504,0.024349114],"genre_scores_gemma":[0.9944346,0.000020460962,0.0050586504,0.000041067826,0.00003857123,0.00016085219,0.00004216958,0.000031035226,0.00017261355],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985335,0.000021173397,0.00055589806,0.00023066475,0.00029816263,0.00036060082],"domain_scores_gemma":[0.99934906,0.000070863796,0.00011104805,0.00036894795,0.000045515215,0.00005455782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025245003,0.00022990348,0.00034850265,0.00034347884,0.00012047256,0.00006253938,0.000325626,0.000053158812,0.00011640116],"category_scores_gemma":[0.000024815312,0.0002114055,0.000020064022,0.00017323745,0.000053190357,0.00021108227,0.000114667906,0.00014773419,0.00004188214],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006687905,0.00010395348,0.93966496,0.00007851175,0.00011043253,0.000019175273,0.002291022,0.048707232,0.00003103872,0.0027134046,0.004744057,0.0014693226],"study_design_scores_gemma":[0.0012964924,0.000073741045,0.9600179,0.00011044967,0.00000933586,6.263015e-7,0.00061059336,0.0015431688,0.020698043,0.000022395432,0.015321748,0.0002955162],"about_ca_topic_score_codex":0.0009276256,"about_ca_topic_score_gemma":0.037270088,"teacher_disagreement_score":0.047164064,"about_ca_system_score_codex":0.00030363203,"about_ca_system_score_gemma":0.00008887672,"threshold_uncertainty_score":0.9802972},"labels":[],"label_agreement":null},{"id":"W2767137066","doi":"10.1007/978-3-319-67837-5_9","title":"Joint Energy Demand Prediction and Control","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"HVAC; Smart grid; Electricity; Energy (signal processing); Energy management; Energy consumption; Consumption (sociology); Control (management); Demand response; Computer science; Joint (building); Environmental economics; Peak demand; Engineering; Architectural engineering; Air conditioning; Economics; Artificial intelligence; Electrical engineering","score_opus":0.016323723155993532,"score_gpt":0.19925679465062696,"score_spread":0.18293307149463342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767137066","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013825198,0.0007958857,0.9922443,0.00022409511,0.0007818907,0.00023958062,0.00007287267,0.000088231965,0.0054148748],"genre_scores_gemma":[0.29930747,0.0020445795,0.6970939,0.0002336182,0.00078757317,0.00008832512,0.00010333216,0.000078380406,0.00026282974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992377,0.000003691071,0.00038147604,0.000087416585,0.00013833841,0.00015137841],"domain_scores_gemma":[0.99924123,0.0000824397,0.00018539284,0.00040017953,0.000055018525,0.00003571801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019268913,0.00021464925,0.0002803644,0.00013779139,0.00062213914,0.00014511067,0.0005526041,0.00015222553,6.326253e-7],"category_scores_gemma":[0.000020671447,0.00018150546,0.00009483365,0.00003305238,0.00029147635,0.00020035905,0.0002610321,0.0001973785,1.4686013e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.7808455e-7,0.0000022225597,0.0000028936659,0.0001463035,0.00010484319,3.805923e-8,0.00019206348,0.977736,0.00000805394,0.0148375705,0.00011817065,0.0068512834],"study_design_scores_gemma":[0.00021994073,0.000026121477,0.0001291963,0.00015741172,0.00007268538,0.000005370769,0.0000010191935,0.9275178,0.00006734531,0.00060034945,0.07101729,0.00018551914],"about_ca_topic_score_codex":0.000019392126,"about_ca_topic_score_gemma":0.0000649321,"teacher_disagreement_score":0.2991692,"about_ca_system_score_codex":0.0000459006,"about_ca_system_score_gemma":0.000027096077,"threshold_uncertainty_score":0.7401577},"labels":[],"label_agreement":null},{"id":"W2767708782","doi":"10.1109/jiot.2017.2771370","title":"Smart Meter Privacy: Exploiting the Potential of Household Energy Storage Units","year":2017,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Smart meter; HVAC; Benchmark (surveying); Demand response; Markov decision process; Energy storage; Leverage (statistics); Energy consumption; Distributed computing; Computer network; Smart grid; Markov process; Air conditioning; Electricity; Artificial intelligence; Engineering","score_opus":0.026861271362014827,"score_gpt":0.21356370075493053,"score_spread":0.1867024293929157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767708782","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87703663,0.00016283503,0.11489553,0.00017180644,0.004240908,0.00004231748,0.0000026738524,0.00006450436,0.0033827715],"genre_scores_gemma":[0.99796,0.00009772884,0.0007681065,0.000079722886,0.00047021257,0.0000033236233,7.191212e-7,0.00005234222,0.00056787307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99865854,0.000048209124,0.0005097305,0.00011850848,0.00039780836,0.00026722605],"domain_scores_gemma":[0.9987574,0.000043397038,0.00046436233,0.0005443974,0.000115707226,0.0000747301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005544185,0.00018311932,0.00026383478,0.00014687906,0.0001314648,0.00019300837,0.0013331948,0.000066155204,0.000047347603],"category_scores_gemma":[0.000097857956,0.0001403555,0.00015098527,0.000056611167,0.00010194745,0.0005803521,0.00022583589,0.00036367972,0.0000025061147],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001592838,0.00013449883,0.0021458913,0.00027463303,0.002655234,0.00039496363,0.006461642,0.73532236,0.145824,0.0025151276,0.08169667,0.022415718],"study_design_scores_gemma":[0.0022968499,0.0003273759,0.009655941,0.0013210769,0.00042128106,0.00063526764,0.00074394915,0.33230332,0.6053135,0.0016656436,0.04437828,0.0009375469],"about_ca_topic_score_codex":0.00026438347,"about_ca_topic_score_gemma":0.000008694346,"teacher_disagreement_score":0.45948946,"about_ca_system_score_codex":0.00006238978,"about_ca_system_score_gemma":0.00001608248,"threshold_uncertainty_score":0.5723531},"labels":[],"label_agreement":null},{"id":"W2768071282","doi":"10.1109/ias.2017.8101862","title":"Distributed energy storage unit-based active demand response for residential loads","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; Smart grid; Peak demand; Power demand; Computer science; Offset (computer science); Energy storage; Grid; Dynamic demand; Distributed generation; Power consumption; Power (physics); Automotive engineering; Reliability engineering; Electrical engineering; Electricity; Engineering; Renewable energy; Mathematics; Operating system","score_opus":0.014325654492759255,"score_gpt":0.2394937588801967,"score_spread":0.22516810438743745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768071282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14239839,0.000022559452,0.85260403,0.00042244353,0.00091792527,0.00015298362,0.00009402005,0.00039452827,0.002993138],"genre_scores_gemma":[0.9968863,0.0000054156276,0.0007995961,0.00005963724,0.00018242242,0.000097266326,0.000091051435,0.00004425053,0.001834028],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999152,0.000043196695,0.00015720764,0.00020108944,0.00014947745,0.00029704036],"domain_scores_gemma":[0.9989417,0.00016141235,0.000048861744,0.0007045401,0.000053059888,0.000090405636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002375615,0.00017286887,0.00015941418,0.00010321915,0.00028130083,0.00014771262,0.00036528736,0.00007995971,0.000093180344],"category_scores_gemma":[0.00016978523,0.00017513252,0.000078714016,0.000054354732,0.000039640887,0.0001991346,0.00007665439,0.00005984672,0.000011709521],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018983961,0.00004666087,0.0002646431,0.00005396797,0.00024604943,0.000051070136,0.000034074255,0.91258526,0.0070342035,0.0053976947,0.07121546,0.0011725457],"study_design_scores_gemma":[0.0029034368,0.00013330385,0.059552636,0.0000338936,0.000086501415,0.0000012857947,0.000056774443,0.53962016,0.13316782,0.00033451302,0.26354322,0.0005664819],"about_ca_topic_score_codex":0.00014894837,"about_ca_topic_score_gemma":0.0003901226,"teacher_disagreement_score":0.85448796,"about_ca_system_score_codex":0.00011195566,"about_ca_system_score_gemma":0.00002680328,"threshold_uncertainty_score":0.7141697},"labels":[],"label_agreement":null},{"id":"W2768248025","doi":"10.2495/sdp-v13-n2-258-267","title":"Greener households? the effectiveness of smart meters in reducing energy consumption levels in the Dach region","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy consumption; Consumption (sociology); Environmental economics; Energy (signal processing); Business; Environmental science; Natural resource economics; Agricultural economics; Economics; Engineering; Electrical engineering; Physics; Art","score_opus":0.025229433113523093,"score_gpt":0.2440155120704993,"score_spread":0.2187860789569762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768248025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9914774,0.00028948038,0.0070007094,0.00007485359,0.00040447677,0.00006194499,2.3020127e-7,0.0000062234985,0.0006847142],"genre_scores_gemma":[0.99948466,0.000041906445,0.0002752329,0.000041065054,0.00010650722,0.000008374773,0.0000018708014,0.000008848108,0.000031536085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99903315,0.0001270565,0.00034019037,0.00007504298,0.00026899128,0.00015555514],"domain_scores_gemma":[0.9993798,0.00028547627,0.000104947525,0.000061792656,0.00015151533,0.000016433074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016782397,0.00009264159,0.00012490727,0.0003332474,0.000042434927,0.000046623965,0.00026108345,0.000033308894,0.0000033284903],"category_scores_gemma":[0.00006342015,0.000063265055,0.000022013131,0.00016760765,0.000043512337,0.00022681883,0.0000507414,0.00012408776,2.1405626e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011972642,0.00013136218,0.3438102,0.0004892667,0.00092560734,0.0036108827,0.040689897,0.56928897,0.0016020079,0.016343059,0.0016913423,0.020220153],"study_design_scores_gemma":[0.0011212428,0.000064262575,0.9691548,0.0008289256,0.000016159087,0.00016281311,0.008982784,0.0037727794,0.008366635,0.0005647118,0.0067855557,0.00017936758],"about_ca_topic_score_codex":0.000080100726,"about_ca_topic_score_gemma":0.000018614617,"teacher_disagreement_score":0.6253446,"about_ca_system_score_codex":0.00019180684,"about_ca_system_score_gemma":0.000038325772,"threshold_uncertainty_score":0.2579874},"labels":[],"label_agreement":null},{"id":"W2769184283","doi":"10.1556/1848.2017.8.2.7","title":"A sustainable design for an off-grid passive container house","year":2017,"lang":"en","type":"article","venue":"International Review of Applied Sciences and Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Rainwater harvesting; Low-energy house; Passive house; Electricity; Grid; Passive solar building design; Photovoltaic system; Civil engineering; Environmental science; Container (type theory); Architectural engineering; Sustainable design; Zero-energy building; Efficient energy use; Environmental economics; Solar energy; Engineering; Sustainability; Electrical engineering; Mechanical engineering; Geography","score_opus":0.020809334230132127,"score_gpt":0.2600014321730996,"score_spread":0.2391920979429675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2769184283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11282081,0.02925868,0.7873101,0.002012715,0.005142892,0.0040017203,0.000044773155,0.0010196124,0.058388665],"genre_scores_gemma":[0.9758729,0.009415499,0.014027308,0.00010395977,0.00024852727,0.00022103402,0.0000040018135,0.00002816281,0.00007866192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999346,0.0000019196582,0.00017276006,0.00014518657,0.00016291632,0.00017119011],"domain_scores_gemma":[0.9996323,0.00004624135,0.00005710178,0.00016025368,0.000057419904,0.000046699955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004115399,0.00010113366,0.00015656381,0.000068282636,0.00010125807,0.00009502879,0.00039940624,0.000018467295,0.000006643527],"category_scores_gemma":[0.00008306158,0.00008947076,0.000031542746,0.000041194784,0.00005046301,0.0002534886,0.00006455155,0.00003620146,0.0000010760536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008606188,0.000016235921,0.000040401217,0.0027239847,0.00008924539,0.0000034505545,0.000085500105,0.82196504,0.0017743806,0.15257356,0.003954569,0.016765049],"study_design_scores_gemma":[0.00047257458,0.000096427,0.0012171047,0.0012158159,0.000040793784,0.0000042744396,0.00016891178,0.8188985,0.0029678782,0.000727775,0.173825,0.00036495298],"about_ca_topic_score_codex":0.000009964278,"about_ca_topic_score_gemma":0.0000012107135,"teacher_disagreement_score":0.863052,"about_ca_system_score_codex":0.000032908192,"about_ca_system_score_gemma":0.000011388563,"threshold_uncertainty_score":0.36485118},"labels":[],"label_agreement":null},{"id":"W2772851490","doi":"10.1109/tii.2017.2781256","title":"Power Peak Shaving With Data Transmission Delays for Thermal Management in Smart Buildings","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Shanghai Aerospace Science and Technology Innovation Foundation; Shanghai Jiao Tong University; Science and Technology Commission of Shanghai Municipality; National Natural Science Foundation of China","keywords":"Thermal management of electronic devices and systems; Peaking power plant; Transmission (telecommunications); Load management; Computer science; Smart power; Power (physics); Automotive engineering; Electrical engineering; Engineering; Reliability engineering; Renewable energy; Mechanical engineering; Distributed generation","score_opus":0.05382569274913196,"score_gpt":0.25912247433359964,"score_spread":0.20529678158446768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772851490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06185122,0.00000489573,0.9253405,0.00016719555,0.0011635645,0.000893905,0.00007864305,0.0002067485,0.010293357],"genre_scores_gemma":[0.9824875,0.000050990006,0.016837072,0.00007046463,0.00009245753,0.00015275166,0.000030148094,0.00006135893,0.0002172566],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866766,0.000010111985,0.0005077079,0.00016207462,0.00027409298,0.00037834712],"domain_scores_gemma":[0.9986857,0.00004900346,0.00009817335,0.0010499085,0.000023622593,0.000093565955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000366321,0.0002537537,0.00022391068,0.00025252166,0.00033254598,0.00022530496,0.0008399246,0.00016167063,0.000059600887],"category_scores_gemma":[0.0000032199514,0.00023142945,0.00005528309,0.00012424545,0.000046343976,0.0011042848,0.000009777067,0.00037736955,0.00001371225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017059185,0.00006903685,0.000022704324,0.00009363365,0.00020542623,0.0000060265547,0.00053036143,0.86911196,0.000045003,0.00009815269,0.0019695063,0.12767762],"study_design_scores_gemma":[0.007982874,0.00032826996,0.0004213706,0.0006069697,0.0002652338,0.000008059895,0.0009789729,0.8377987,0.005398415,0.000020761252,0.14527825,0.000912131],"about_ca_topic_score_codex":0.000035617482,"about_ca_topic_score_gemma":0.00003589702,"teacher_disagreement_score":0.9206363,"about_ca_system_score_codex":0.00013250529,"about_ca_system_score_gemma":0.00002050862,"threshold_uncertainty_score":0.9437419},"labels":[],"label_agreement":null},{"id":"W2773032997","doi":"10.23919/picmet.2017.8125281","title":"Typology of Business Models for Adopting Grid-Scale Emerging Storage Technologies","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Business model; Energy storage; Electricity market; Environmental economics; Electricity; Renewable energy; Grid; Profitability index; Computer science; Distributed generation; Smart grid; Efficient energy use; Risk analysis (engineering); Business; Engineering; Marketing; Economics","score_opus":0.021843501205078424,"score_gpt":0.2297850532805818,"score_spread":0.20794155207550338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773032997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13485692,0.00018603464,0.8095647,0.00053708797,0.0019040098,0.00026265337,0.000009180269,0.0013933692,0.051286004],"genre_scores_gemma":[0.97290915,0.000069700414,0.026614988,0.0000067418387,0.0000844616,0.0000494945,0.000003535112,0.00002911616,0.00023282332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939746,0.0000026416735,0.00016962683,0.00013708805,0.00006665142,0.00022654147],"domain_scores_gemma":[0.99930876,0.000025235102,0.000058264697,0.00053444464,0.000060039554,0.000013242008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010827601,0.00011240906,0.00018002615,0.000104210354,0.000118890894,0.00002453268,0.00039528625,0.00007849262,0.0000102339945],"category_scores_gemma":[0.000056350917,0.00010858252,0.00003856198,0.00006122686,0.0000660276,0.00021664726,0.00018096983,0.000053925065,0.000002712952],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003772417,0.000008832969,0.00042553307,0.00014090906,0.00003919298,0.0000012608189,0.00003702553,0.9780541,0.0010106501,0.012612252,0.0014424738,0.0062240213],"study_design_scores_gemma":[0.0005537694,0.000025311021,0.0039558057,0.00005477365,0.00003719495,0.0000013264558,0.0010813547,0.9649303,0.0145288855,0.0024263023,0.012065607,0.00033939254],"about_ca_topic_score_codex":0.0000498826,"about_ca_topic_score_gemma":0.0000630275,"teacher_disagreement_score":0.8380522,"about_ca_system_score_codex":0.000026853199,"about_ca_system_score_gemma":0.0000045647876,"threshold_uncertainty_score":0.44278666},"labels":[],"label_agreement":null},{"id":"W2773137334","doi":"10.1109/jas.2017.7510691","title":"Economical optimization of grid power factor using predictive data","year":2017,"lang":"en","type":"article","venue":"IEEE/CAA Journal of Automatica Sinica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Dalhousie University; U.S. Department of Energy","keywords":"Factor (programming language); Computer science; Power grid; Predictive power; Grid; Power (physics); Mathematics; Physics","score_opus":0.05302742896056461,"score_gpt":0.28955430898672974,"score_spread":0.23652688002616512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773137334","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7744176,0.00016059712,0.21413334,0.00027893245,0.006316258,0.00021563571,0.00015733587,0.00012232138,0.0041979793],"genre_scores_gemma":[0.9617015,0.00007411001,0.03773776,0.0000152387565,0.00041512158,7.1369743e-7,0.000004779105,0.000040610084,0.000010150603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984566,0.00004033858,0.00088265614,0.00014995104,0.00026409104,0.00020638933],"domain_scores_gemma":[0.99787116,0.00012987222,0.0006786956,0.0010882278,0.000110058536,0.000121963996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003875849,0.0001700325,0.00044089084,0.00014729996,0.00008999043,0.00010979821,0.0011364521,0.000091543196,0.00018953886],"category_scores_gemma":[0.00028317582,0.0001581943,0.00010448173,0.000044808567,0.00011286682,0.000967185,0.00018867549,0.00020040703,0.000007679742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023287825,0.000057524085,0.00043896807,0.000045733257,0.00037830375,0.000013301835,0.00010542891,0.9941245,0.0008244358,0.000031819174,0.0036381017,0.0003186231],"study_design_scores_gemma":[0.00060391414,0.000105932886,0.009457106,0.0001831337,0.00012397941,0.00003114782,0.000029767576,0.98653466,0.0016764693,0.000035141948,0.0010624473,0.00015632092],"about_ca_topic_score_codex":0.0000042326096,"about_ca_topic_score_gemma":0.0000013099219,"teacher_disagreement_score":0.1872839,"about_ca_system_score_codex":0.00012020583,"about_ca_system_score_gemma":0.00007490275,"threshold_uncertainty_score":0.6450977},"labels":[],"label_agreement":null},{"id":"W2773257536","doi":"10.1109/tii.2017.2782725","title":"Joint Load Scheduling and Voltage Regulation in the Distribution System With Renewable Generators","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Alberta","funders":"Innovation-Driven Project of Central South University; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Renewable energy; Voltage regulation; Smart grid; Overvoltage; Computer science; Scheduling (production processes); Demand response; Electric power system; Voltage; Automotive engineering; Reliability engineering; Electricity; Engineering; Electrical engineering; Power (physics)","score_opus":0.030954491375054634,"score_gpt":0.20666066780852207,"score_spread":0.17570617643346745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773257536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23916861,0.000005554858,0.75806576,0.00005848123,0.0007861011,0.000296854,0.00002261899,0.000114310686,0.0014817016],"genre_scores_gemma":[0.999348,0.000015477772,0.00039513572,0.000012367306,0.00012426003,0.000051334657,0.000009912329,0.0000127111425,0.000030834082],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999098,0.000018265457,0.00035467694,0.00006871913,0.00028032615,0.00018002286],"domain_scores_gemma":[0.99939495,0.000026303085,0.00009798167,0.00040647632,0.000033100274,0.000041175288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004470373,0.00014435638,0.00014135831,0.000076282246,0.0003805125,0.00029674752,0.00016056333,0.00012494883,0.0000037101668],"category_scores_gemma":[0.000008975661,0.00010977219,0.000026242495,0.00012692648,0.000045875502,0.00050697447,0.0000019724973,0.00027215242,0.0000066391794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016593325,0.000009623896,0.00002703297,0.00004569481,0.00002728514,0.0000013857357,0.0003443229,0.9966173,0.000038979353,0.00019653274,0.00032057444,0.0023546675],"study_design_scores_gemma":[0.0015542804,0.000081521175,0.0003660587,0.00026874122,0.00005947193,0.000013634361,0.0018732557,0.98070747,0.012562216,0.000010946477,0.0022555548,0.00024687857],"about_ca_topic_score_codex":0.00023680418,"about_ca_topic_score_gemma":0.00016190454,"teacher_disagreement_score":0.76017934,"about_ca_system_score_codex":0.00029985353,"about_ca_system_score_gemma":0.000030232346,"threshold_uncertainty_score":0.447638},"labels":[],"label_agreement":null},{"id":"W2774787369","doi":"10.3390/s17122812","title":"Energy Management in Smart Cities Based on Internet of Things: Peak Demand Reduction and Energy Savings","year":2017,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":135,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Powertech Labs (Canada); University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Efficient energy use; Carbon footprint; Information and Communications Technology; Energy conservation; Agile software development; Home automation; Energy management; Environmental economics; Computer science; Robustness (evolution); Energy consumption; Engineering; Energy (signal processing); Greenhouse gas; Telecommunications","score_opus":0.007553504877234909,"score_gpt":0.19202938503109016,"score_spread":0.18447588015385524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774787369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8991346,0.00009802975,0.0026258167,0.00016989459,0.00094371947,0.000058087186,0.0000013471277,0.00014062464,0.09682792],"genre_scores_gemma":[0.9964321,0.00016657452,0.00047414532,0.000060328774,0.000056449844,0.000011692242,0.000005531004,0.000030495403,0.0027626865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992101,0.000024728884,0.0002052718,0.00020774572,0.00016141184,0.00019073591],"domain_scores_gemma":[0.999462,0.000019050378,0.00006465214,0.00040255024,0.00001301453,0.00003873617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013272303,0.00015972945,0.00017154847,0.00026478132,0.00004747919,0.000053337495,0.0001668098,0.000053445146,0.000017836774],"category_scores_gemma":[0.0000099322015,0.00016893177,0.000035694116,0.000050641007,0.00007032693,0.00012433708,0.00008305859,0.00006141386,0.0000017033898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014390469,0.00009943672,0.00279492,0.00046975294,0.00031843054,0.00011286027,0.0014004355,0.8946441,0.001703276,0.04035398,0.006540567,0.051418353],"study_design_scores_gemma":[0.0012039139,0.000111739064,0.03444096,0.00041354154,0.000055234803,0.000005939671,0.0005050762,0.8971392,0.028037693,0.0006911445,0.03689565,0.0004998984],"about_ca_topic_score_codex":0.000935941,"about_ca_topic_score_gemma":0.00010188482,"teacher_disagreement_score":0.097297534,"about_ca_system_score_codex":0.000069339825,"about_ca_system_score_gemma":0.0000022363188,"threshold_uncertainty_score":0.6888838},"labels":[],"label_agreement":null},{"id":"W2775376604","doi":"10.1109/smc.2017.8123019","title":"Market-based mechanisms for smart grid management: Necessity, applications and opportunities","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Microgrid; Computer science; Electricity market; Energy management; Distributed generation; Load management; Grid; Electricity; Risk analysis (engineering); Supply and demand; Environmental economics; Demand response; Business; Renewable energy; Energy (signal processing); Engineering; Electrical engineering; Control (management); Economics; Microeconomics","score_opus":0.028666867868197478,"score_gpt":0.230324954295808,"score_spread":0.20165808642761052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775376604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021459642,0.000039924602,0.6919678,0.0006664911,0.00034695564,0.00045790637,0.00001741605,0.0003378644,0.30595103],"genre_scores_gemma":[0.8016039,0.0009506802,0.14008144,0.0014722224,0.0005990304,0.004986816,0.00016298145,0.00019926176,0.04994363],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940664,0.000005246017,0.00012276619,0.0001711364,0.00009663012,0.00019757071],"domain_scores_gemma":[0.9992994,0.000026667036,0.00003177133,0.00055099867,0.000018763847,0.00007238701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016641604,0.00013374431,0.000109794324,0.00008726794,0.00032294667,0.00019090045,0.00028732594,0.00003530679,0.00012374809],"category_scores_gemma":[0.0000029380158,0.0001380017,0.00003542857,0.00001852064,0.000039172726,0.00015623444,0.00012673944,0.00003276784,0.000009004394],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001759539,0.000049753544,0.00022388379,0.000979174,0.0002801832,0.000011225125,0.000014820713,0.0066884644,0.00010368016,0.79029554,0.12497216,0.07636355],"study_design_scores_gemma":[0.000986129,0.0000265196,0.0048198886,0.000033267675,0.00011359013,0.0000012025314,0.00012256949,0.19658098,0.0016363575,0.013688867,0.7815412,0.00044939743],"about_ca_topic_score_codex":0.000011275808,"about_ca_topic_score_gemma":0.000032118434,"teacher_disagreement_score":0.80138934,"about_ca_system_score_codex":0.00002258616,"about_ca_system_score_gemma":0.0000033898734,"threshold_uncertainty_score":0.5627546},"labels":[],"label_agreement":null},{"id":"W2775772607","doi":"10.1109/iecon.2017.8216069","title":"Parameter estimation of electric water heater models using extended Kalman filter","year":2017,"lang":"en","type":"article","venue":"IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Kalman filter; Electric heating; Energy consumption; Electric energy consumption; Water heater; Heating system; Electric power; Thermal; Estimation theory; Computer science; Water heating; Process (computing); Energy (signal processing); Power (physics); Electric energy; Engineering; Mechanical engineering; Algorithm; Meteorology","score_opus":0.07550263242113019,"score_gpt":0.26391391261461034,"score_spread":0.18841128019348014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775772607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98513544,0.00007543873,0.011985621,0.00022431073,0.0013466269,0.0003972002,0.000035341403,0.00006904303,0.0007310005],"genre_scores_gemma":[0.9988072,0.00008591728,0.00050124293,0.000031235464,0.00022660872,0.000018050667,0.000009336411,0.000045064302,0.0002753506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801064,0.00006901072,0.0005610831,0.00030468297,0.00038052144,0.0006740941],"domain_scores_gemma":[0.9983052,0.00004674285,0.00030464178,0.0010628706,0.00021146609,0.00006907976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049068296,0.00032572192,0.00047340733,0.000060482165,0.00028841573,0.00014388461,0.0010654837,0.0003621661,0.000044793094],"category_scores_gemma":[0.000052462976,0.00024041241,0.00035137014,0.000080179074,0.00018721008,0.00076904567,0.00016731316,0.00058374123,0.000004587844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006401584,0.000069718415,0.000073702955,0.00007600308,0.0005401211,0.0000010148992,0.001350946,0.9392411,0.046198726,0.0008435781,0.007368116,0.0041729757],"study_design_scores_gemma":[0.00076418015,0.000092398936,0.00007621238,0.000065720254,0.00012216378,0.000003470742,0.000051004507,0.68958837,0.3052189,0.003413532,0.0003488821,0.00025518856],"about_ca_topic_score_codex":0.00016684202,"about_ca_topic_score_gemma":0.000018450542,"teacher_disagreement_score":0.25902018,"about_ca_system_score_codex":0.00023793396,"about_ca_system_score_gemma":0.00016213243,"threshold_uncertainty_score":0.9803733},"labels":[],"label_agreement":null},{"id":"W2778611676","doi":"10.1109/globalsip.2017.8309133","title":"Incorporating time-of-day usage patterns into non-intrusive load monitoring","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power consumption; Reduction (mathematics); Real-time computing; Consumption (sociology); Class (philosophy); Power (physics); Power demand; Reliability engineering; Artificial intelligence; Engineering","score_opus":0.009118030189375704,"score_gpt":0.22481855715743904,"score_spread":0.21570052696806333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2778611676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8825603,0.000026547765,0.04525764,0.000053866188,0.0018003943,0.00014440899,0.0000021860978,0.00027478652,0.069879875],"genre_scores_gemma":[0.9946185,0.000013742535,0.0039491258,0.000008386915,0.00046319512,0.000018243318,0.0000020516047,0.00003806055,0.00088870124],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99915326,0.000010336853,0.00023410459,0.00016948361,0.00022274746,0.0002100904],"domain_scores_gemma":[0.9990908,0.000035374876,0.000092660135,0.00066841283,0.000048524966,0.00006426125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023327627,0.00016462356,0.00018910134,0.00006322976,0.00014556722,0.0000963041,0.00042784802,0.00005377801,0.00011629343],"category_scores_gemma":[0.000055888293,0.0001643422,0.00005066618,0.00004187927,0.000031464653,0.00029174003,0.00026923112,0.0001027307,0.00016676942],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010645217,0.00006186162,0.4770535,0.00056189316,0.0005009319,0.00012727699,0.0027692239,0.37114313,0.08227726,0.0007599859,0.003951115,0.060783196],"study_design_scores_gemma":[0.0009138251,0.00007269578,0.27406576,0.00042226337,0.00006267578,0.000002414003,0.00041543983,0.32157052,0.39881834,0.00044485525,0.002292278,0.0009189329],"about_ca_topic_score_codex":0.00050594314,"about_ca_topic_score_gemma":0.00006359999,"teacher_disagreement_score":0.31654108,"about_ca_system_score_codex":0.00012545558,"about_ca_system_score_gemma":0.000011505093,"threshold_uncertainty_score":0.67016804},"labels":[],"label_agreement":null},{"id":"W2779684463","doi":"","title":"Load Scheduling for Residential Demand Response on Smart Grids","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; Computer science; Time horizon; Scheduling (production processes); Mathematical optimization; Schedule; Smart grid; Load management; Electric power system; Linear programming; Grid; Integer programming; Photovoltaic system; Electricity; Energy consumption; Power (physics); Engineering; Electrical engineering","score_opus":0.016447920411626744,"score_gpt":0.23557140248903224,"score_spread":0.2191234820774055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2779684463","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32789662,0.0015043513,0.5996333,0.0077793873,0.0033008584,0.001299247,0.00012830821,0.0012540292,0.057203915],"genre_scores_gemma":[0.94404656,0.00059588545,0.042237133,0.000069356545,0.00018910503,0.00038839714,0.00032114124,0.00017159866,0.011980846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99582237,0.0018345654,0.0005347231,0.00077652046,0.00053888466,0.0004929584],"domain_scores_gemma":[0.9935827,0.0015174035,0.00029340092,0.0033522295,0.0010721554,0.00018209033],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0084878085,0.00045705348,0.0004362857,0.00026965575,0.00052587205,0.0007219783,0.0016358756,0.00036094297,0.000056483175],"category_scores_gemma":[0.0031201474,0.00053625315,0.00029287368,0.0001186208,0.00014495406,0.000141321,0.001108667,0.00063315564,0.00007157772],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011606656,0.00092725357,0.0015021975,0.0025279273,0.0015592143,0.00006615613,0.010814281,0.7977555,0.013563347,0.076413706,0.05494402,0.038765736],"study_design_scores_gemma":[0.002821607,0.000002726975,0.012995954,0.0067023938,0.00028401866,0.000008538049,0.00009550177,0.5919632,0.15248089,0.007397863,0.22320667,0.0020406712],"about_ca_topic_score_codex":0.0003506055,"about_ca_topic_score_gemma":0.0009712944,"teacher_disagreement_score":0.6161499,"about_ca_system_score_codex":0.000407745,"about_ca_system_score_gemma":0.00022289813,"threshold_uncertainty_score":0.9997089},"labels":[],"label_agreement":null},{"id":"W2781825008","doi":"10.3390/en11010088","title":"Power Estimation of Multiple Two-State Loads Using A Probabilistic Non-Intrusive Approach","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Thermostat; Computer science; Inference; Kronecker delta; Task (project management); Probabilistic logic; Markov chain; Hidden Markov model; State (computer science); Markov model; Event (particle physics); State space; Electrical load; Power (physics); Data mining; Machine learning; Artificial intelligence; Engineering; Algorithm; Mathematics; Statistics","score_opus":0.009132344461649042,"score_gpt":0.21845196136356887,"score_spread":0.20931961690191983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781825008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86188835,0.000036789323,0.12901276,0.0000038853386,0.00047836977,0.00012843643,0.0000038420562,0.00017902903,0.008268536],"genre_scores_gemma":[0.9641068,0.0000034466239,0.03562156,0.000009294121,0.000100522295,0.000024976558,0.000009219442,0.000035995537,0.000088155575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992239,0.00001532404,0.00022257831,0.00016539874,0.00015780795,0.00021502287],"domain_scores_gemma":[0.99953824,0.00003608268,0.000047028963,0.0002806299,0.00006357251,0.000034415258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000966339,0.00015340021,0.00017092403,0.00012299443,0.00004526143,0.000024165814,0.000130806,0.000032429052,0.000029657796],"category_scores_gemma":[0.000050587238,0.00015162946,0.000041051873,0.00021484055,0.00010474793,0.0001458235,0.00007202172,0.00005182796,0.00001543434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008713836,0.000019894818,0.000110548914,0.00006985992,0.000048659113,0.0000012491184,0.0007055665,0.9933508,0.004163388,0.0006012968,0.00027915894,0.0006408307],"study_design_scores_gemma":[0.0003126303,0.000029416951,0.00084986247,0.000030688076,0.000017453607,0.0000019375996,0.00009784371,0.96856064,0.02925406,0.00025108331,0.00043157546,0.00016278308],"about_ca_topic_score_codex":0.00009763638,"about_ca_topic_score_gemma":0.000018959405,"teacher_disagreement_score":0.10221848,"about_ca_system_score_codex":0.0000817153,"about_ca_system_score_gemma":0.000012878942,"threshold_uncertainty_score":0.618327},"labels":[],"label_agreement":null},{"id":"W2782764707","doi":"10.1109/bigdata.2017.8258254","title":"Efficient incremental data analytics with apache spark","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"SPARK (programming language); Computer science; Speedup; Scalability; Smart meter; Analytics; Big data; Data analysis; Context (archaeology); Computation; Field (mathematics); Efficient energy use; Electricity; Real-time computing; Data science; Data mining; Database; Parallel computing; Algorithm; Engineering","score_opus":0.04724063593868591,"score_gpt":0.2396669557520377,"score_spread":0.1924263198133518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782764707","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5525035,0.000043825847,0.08069191,0.0002328065,0.0006520727,0.0001783222,0.000020143603,0.00049371994,0.36518365],"genre_scores_gemma":[0.99472344,0.0000067839533,0.004519115,0.000033875865,0.00011403672,0.0000026467392,0.000029745783,0.000023219463,0.00054711354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993488,0.0000038480684,0.00009208289,0.00017956589,0.00018723684,0.00018843205],"domain_scores_gemma":[0.9981552,0.0000072712965,0.000017887012,0.0017537889,0.000009679529,0.000056211287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001377633,0.00010995025,0.000092301765,0.00003881209,0.0001165977,0.00011914147,0.00074799545,0.000020494212,0.000119138655],"category_scores_gemma":[0.000008898738,0.000086950575,0.000011539614,0.000036014284,0.000040819665,0.00008134697,0.00041643507,0.000060448692,0.00009139934],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003992152,0.000020419824,0.0051916004,0.000016323289,0.00012297517,0.000014749434,0.000017400389,0.9805852,0.00011565136,0.00097472017,0.012268458,0.0006685103],"study_design_scores_gemma":[0.0002888726,0.000013863424,0.017762627,0.000010820758,0.00003749963,0.0000020839486,0.000058593443,0.9691944,0.001069212,0.0000022435327,0.011400731,0.00015904213],"about_ca_topic_score_codex":0.00012040615,"about_ca_topic_score_gemma":0.00022183589,"teacher_disagreement_score":0.4422199,"about_ca_system_score_codex":0.00004652673,"about_ca_system_score_gemma":0.000004987034,"threshold_uncertainty_score":0.35457414},"labels":[],"label_agreement":null},{"id":"W2783668805","doi":"10.1177/1477153517731909","title":"Lighting controls: Evolution and revolution","year":2018,"lang":"en","type":"article","venue":"Lighting Research & Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Smart lighting; Intelligent lighting; Daylight; LED lamp; Architectural engineering; Computer science; Context (archaeology); Function (biology); Wireless; System integration; Control (management); Systems engineering; Telecommunications; Engineering; Electrical engineering; Database; Artificial intelligence; Geography","score_opus":0.01828340284506365,"score_gpt":0.28146000322795384,"score_spread":0.2631766003828902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783668805","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9127644,0.0047363383,0.03562379,0.004409183,0.00097234716,0.00060709164,0.000003035484,0.004127151,0.036756705],"genre_scores_gemma":[0.996941,0.00009695396,0.0019487597,0.000013097602,0.0005744511,0.00007421296,0.000002378938,0.00003977523,0.000309398],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99821484,0.00006880767,0.0002572696,0.0003554557,0.0003188057,0.00078479334],"domain_scores_gemma":[0.9991191,0.0001231401,0.000029860043,0.0004412485,0.00021305538,0.000073566036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010086006,0.00015002242,0.0001842713,0.0010073201,0.00038169182,0.000051653606,0.00029996474,0.0002477351,0.00002351551],"category_scores_gemma":[0.00059157104,0.0001519942,0.000023790511,0.0011587128,0.0004485758,0.00014693748,0.00031937356,0.00053279643,0.00015787747],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007663627,0.00012544877,0.024304373,0.0003738871,0.00041834032,0.000107682325,0.0009919147,0.0039067594,0.37117416,0.44907004,0.055584624,0.093866125],"study_design_scores_gemma":[0.002243789,0.0012582702,0.016566828,0.00063392584,0.000053891836,0.00013225709,0.001696014,0.3738876,0.15548731,0.065802194,0.38101223,0.0012256826],"about_ca_topic_score_codex":0.000050742026,"about_ca_topic_score_gemma":0.00006220501,"teacher_disagreement_score":0.38326785,"about_ca_system_score_codex":0.00033062283,"about_ca_system_score_gemma":0.000016978951,"threshold_uncertainty_score":0.6198144},"labels":[],"label_agreement":null},{"id":"W2783789685","doi":"10.1109/tsg.2018.2792322","title":"Distributionally Robust Chance-Constrained Energy Management for Islanded Microgrids","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":181,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Microgrid; Mathematical optimization; Robust optimization; Wind power; Energy management; Smart grid; Computer science; Moment (physics); Renewable energy; Distributed generation; Ambiguity; Electricity generation; Power (physics); Energy (signal processing); Engineering; Mathematics","score_opus":0.011707645687812544,"score_gpt":0.20241158387663305,"score_spread":0.1907039381888205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783789685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029554078,0.000034835382,0.9825964,0.00022544886,0.0065879175,0.00034650328,0.0003600657,0.00065472955,0.0062387013],"genre_scores_gemma":[0.98657316,0.00020311306,0.0078801885,0.00034908293,0.0013860984,0.0008763377,0.00016241966,0.00010309854,0.0024665163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984428,0.000019610905,0.00034804066,0.00040093833,0.00025154254,0.00053702726],"domain_scores_gemma":[0.9992626,0.000054257634,0.000035365636,0.00043090057,0.00009172422,0.00012520782],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014128425,0.00033111894,0.0002397675,0.00024036743,0.0002823889,0.000059067243,0.000258994,0.00010788208,0.00027940708],"category_scores_gemma":[0.0000013727418,0.00035592515,0.00020048021,0.00034403417,0.0001256619,0.00013464718,0.0000030027772,0.00012271716,0.00010964574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035785124,0.00056274515,0.000021549546,0.0002673026,0.0017956495,0.000027020693,0.00014303731,0.8138057,0.003842592,0.0075231087,0.10443013,0.06722331],"study_design_scores_gemma":[0.003667113,0.00052962627,0.0006348873,0.00013780002,0.000345234,0.000028436567,0.000095185984,0.15960553,0.1364913,0.00040628688,0.6967775,0.0012811014],"about_ca_topic_score_codex":0.000019027,"about_ca_topic_score_gemma":0.00017511925,"teacher_disagreement_score":0.9836177,"about_ca_system_score_codex":0.00020397578,"about_ca_system_score_gemma":0.000015825477,"threshold_uncertainty_score":0.99988925},"labels":[],"label_agreement":null},{"id":"W27854292","doi":"10.3390/pharmaceutics8040033","title":"Encouraging Sustainable Energy Use in the Office with Persuasive Mobile Information Systems","year":2014,"lang":"en","type":"article","venue":"International Conference on Information Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Queen's University; McGill University","funders":"","keywords":"Computer science; Persuasive technology; Energy (signal processing); Environmental economics; Persuasion","score_opus":0.010863580342508021,"score_gpt":0.20330080261611946,"score_spread":0.19243722227361143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W27854292","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08727005,0.000035585977,0.30083916,0.00021851333,0.003875868,0.0013933189,0.00004527799,0.00056102773,0.6057612],"genre_scores_gemma":[0.99850035,0.000023555147,0.000022705393,0.0002044319,0.0001182499,0.0005980597,0.0001988202,0.000009948359,0.00032385747],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983309,0.000066925975,0.0005548402,0.00008872087,0.0007041135,0.00025453095],"domain_scores_gemma":[0.9988787,0.00012119616,0.00018771064,0.00027468358,0.000495501,0.000042204345],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00052102417,0.00019341895,0.00015871624,0.0005044252,0.000080196456,0.0012095941,0.00042642932,0.00006638059,0.000015161156],"category_scores_gemma":[0.000054008746,0.0001455916,0.000028412152,0.00025330525,0.000023817662,0.0045042536,0.000035088695,0.00015288913,0.00012835894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018338067,0.000007504039,0.00015710448,0.000071352064,0.000026007305,0.0000012942412,0.001507527,0.6487121,0.0000021637452,0.34778395,0.0013432197,0.00036945005],"study_design_scores_gemma":[0.0004076051,0.00007099274,0.0004944018,0.00012871184,0.0000047073004,0.000016551598,0.020000698,0.62333137,0.000013537209,0.00001356182,0.35534835,0.00016953818],"about_ca_topic_score_codex":0.0012930601,"about_ca_topic_score_gemma":0.000037411097,"teacher_disagreement_score":0.9112303,"about_ca_system_score_codex":0.0003243697,"about_ca_system_score_gemma":0.000035455734,"threshold_uncertainty_score":0.99982727},"labels":[],"label_agreement":null},{"id":"W2785621755","doi":"10.1109/jiot.2018.2805899","title":"A fog-based internet of energy architecture for transactive energy management systems","year":2018,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":163,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Computer network; Smart grid; Cloud computing; Distributed computing; Energy consumption; The Internet; Interoperability; Server; Operating system","score_opus":0.00798792106323306,"score_gpt":0.2029918080253302,"score_spread":0.19500388696209714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785621755","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02006638,0.00026655916,0.97082347,0.000055528806,0.0036384559,0.00011512076,0.0000071530358,0.00008339543,0.00494394],"genre_scores_gemma":[0.99179274,0.000037133424,0.006198724,0.00014527843,0.00046261807,0.000042597185,0.000004622858,0.000075301235,0.0012409602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982385,0.000053899978,0.000722108,0.0002248586,0.00039177452,0.0003688571],"domain_scores_gemma":[0.9990562,0.00008058492,0.0002937139,0.00026700474,0.00018793152,0.00011457193],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003272694,0.00029422183,0.00044110595,0.00049505656,0.000026158543,0.000062350395,0.0006534094,0.00010801275,0.00006293427],"category_scores_gemma":[0.000008923566,0.00027032418,0.00029304737,0.0001483765,0.00010739751,0.00016475903,0.000034662015,0.00018981885,0.0000019183599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012752006,0.00031957595,0.000076171695,0.0016206537,0.005019752,0.00009021594,0.0038071093,0.84134275,0.012196864,0.016082231,0.07424243,0.04392703],"study_design_scores_gemma":[0.001925135,0.00090307015,0.000039648778,0.0012115871,0.00022983273,0.000086536915,0.00014257147,0.60641384,0.28099594,0.0009244125,0.106684275,0.00044316574],"about_ca_topic_score_codex":0.00027636922,"about_ca_topic_score_gemma":0.000040985087,"teacher_disagreement_score":0.97172636,"about_ca_system_score_codex":0.00016564141,"about_ca_system_score_gemma":0.0000155624,"threshold_uncertainty_score":0.9999749},"labels":[],"label_agreement":null},{"id":"W2785933625","doi":"10.1145/3177755","title":"An Online Emergency Demand Response Mechanism for Cloud Computing","year":2018,"lang":"en","type":"article","venue":"ACM Transactions on Modeling and Performance Evaluation of Computing Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Cloud computing; Computer science; Server; Provisioning; Online algorithm; Mechanism design; Scheduling (production processes); Distributed computing; Database; Mathematical optimization; Operating system; Algorithm; Microeconomics","score_opus":0.06715490519883746,"score_gpt":0.30869157979901923,"score_spread":0.24153667460018177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785933625","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50170064,0.00004504699,0.49651682,0.000014712397,0.0013594659,0.00022483885,0.0000059382223,0.000114302515,0.000018212555],"genre_scores_gemma":[0.9909475,0.000054188466,0.008396873,0.000012119603,0.00050529186,0.000018362653,0.000015611076,0.000037927846,0.000012169211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838084,0.00016219188,0.0005642173,0.00025141842,0.0004115326,0.00022980814],"domain_scores_gemma":[0.99874735,0.000099489174,0.00009192235,0.00041386485,0.00058554043,0.00006182935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029138185,0.00018271178,0.0002207796,0.00022473195,0.00035607617,0.000029540712,0.00018967585,0.00008129526,0.000007572156],"category_scores_gemma":[0.000040400395,0.00019402124,0.000049884184,0.00017992406,0.00002122571,0.00014576394,0.0000058032683,0.000107564796,0.0000027245392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008739849,0.00003588108,0.000026282754,0.00012697719,0.000056295612,2.9175046e-8,0.0009903935,0.98526585,0.00064391404,0.00007065703,0.000013488104,0.012682808],"study_design_scores_gemma":[0.00068390096,0.00042205575,0.00025393456,0.00020327851,0.00010034326,0.0000034136935,0.00041113788,0.9966431,0.0009150861,0.0001505045,0.000016114014,0.00019710185],"about_ca_topic_score_codex":0.000020563639,"about_ca_topic_score_gemma":0.000008885908,"teacher_disagreement_score":0.4892468,"about_ca_system_score_codex":0.00008032611,"about_ca_system_score_gemma":0.00002844578,"threshold_uncertainty_score":0.7911957},"labels":[],"label_agreement":null},{"id":"W2786184176","doi":"10.1109/epec.2017.8286219","title":"Evaluation of electric vehicle penetration in a residential sector under demand response considering both cost and convenience","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Penetration (warfare); Electric vehicle; Automotive engineering; Computer science; Engineering; Electrical engineering; Electricity; Operations research","score_opus":0.03819540315975632,"score_gpt":0.27354209298252585,"score_spread":0.23534668982276952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786184176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99344295,0.00014816257,0.004544893,0.00006855015,0.00012513215,0.00021923422,3.564141e-7,0.000032242177,0.0014184732],"genre_scores_gemma":[0.999721,0.00003158748,0.00014826334,0.000010476633,0.000020711408,0.000024168561,5.8008965e-7,0.000009647963,0.00003359269],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992274,0.00009530177,0.0001620423,0.000121317535,0.00027074546,0.00012319176],"domain_scores_gemma":[0.99959385,0.00007358855,0.000043307973,0.00021460875,0.000048253176,0.00002636384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014995828,0.00006888922,0.00008945693,0.0001267764,0.00005927654,0.00005376778,0.00007036815,0.000034378525,0.00005025112],"category_scores_gemma":[0.00022194667,0.000074943644,0.000010617502,0.00006513803,0.00002827998,0.00023577569,0.0000313127,0.000047398193,0.000002247102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012927905,0.000017918934,0.015187556,0.000040610314,0.00004421657,0.000004884416,0.0002355046,0.693215,0.2877019,0.0013015685,0.00022779431,0.0018937392],"study_design_scores_gemma":[0.0005984535,0.000016513271,0.4816749,0.000013822421,0.000018085142,0.0000012289335,0.000027874146,0.48314524,0.034217685,0.00020709826,0.000019976145,0.000059087073],"about_ca_topic_score_codex":0.00017625188,"about_ca_topic_score_gemma":0.0011174048,"teacher_disagreement_score":0.46648738,"about_ca_system_score_codex":0.00010822294,"about_ca_system_score_gemma":0.000043275184,"threshold_uncertainty_score":0.3056113},"labels":[],"label_agreement":null},{"id":"W2786621724","doi":"10.1109/pesgm.2017.8274325","title":"Energy management in multi-microgrid systems — development and assessment","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; University of British Columbia","funders":"","keywords":"Microgrid; Energy management; Reliability engineering; Computer science; Distributed generation; Energy management system; Robustness (evolution); Energy storage; Probabilistic logic; Smart grid; Photovoltaic system; Energy consumption; Renewable energy; Engineering; Energy (signal processing); Electrical engineering","score_opus":0.024550356265005253,"score_gpt":0.2513470267586028,"score_spread":0.22679667049359756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786621724","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28990743,0.0030841173,0.22947344,0.00026881762,0.005448754,0.0009457787,0.0000030833912,0.0011658758,0.46970272],"genre_scores_gemma":[0.9607093,0.00077314465,0.035640996,0.00003318191,0.000039580114,0.00018986208,0.0000054424695,0.000033424763,0.0025750827],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991131,0.000010436484,0.0002384278,0.00022025836,0.00014312095,0.00027467095],"domain_scores_gemma":[0.9994526,0.0000070864203,0.00003116132,0.00043558705,0.000008928341,0.00006466117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001721216,0.00016962725,0.00015727349,0.00013715964,0.00011841713,0.00021392413,0.0002473981,0.00003954775,0.000013466769],"category_scores_gemma":[0.0000011550352,0.0001661093,0.000015221545,0.00003476379,0.000021406797,0.00014039635,0.00025360755,0.000063593965,0.000012650107],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000918686,0.0002722163,0.041889112,0.0008657912,0.0009816654,0.00051876606,0.00034068272,0.22399893,0.00042346472,0.111916274,0.008811524,0.6099724],"study_design_scores_gemma":[0.0010081432,0.00000727394,0.21766911,0.000070371076,0.000012294012,0.0000033126764,0.00016423814,0.24055018,0.00073836965,0.000011874473,0.5393953,0.00036955418],"about_ca_topic_score_codex":0.0002064668,"about_ca_topic_score_gemma":0.00041380367,"teacher_disagreement_score":0.6708019,"about_ca_system_score_codex":0.00017918991,"about_ca_system_score_gemma":0.0000061793708,"threshold_uncertainty_score":0.67737406},"labels":[],"label_agreement":null},{"id":"W2787324491","doi":"10.1109/epec.2017.8286168","title":"Dispatching thermostatically controlled loads for frequency regulation using adversarial multi-armed bandits","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Regret; Demand response; Adversarial system; Computer science; Mathematical optimization; SIGNAL (programming language); Grid; Energy (signal processing); Smart grid; Engineering; Artificial intelligence; Mathematics; Machine learning; Electricity; Electrical engineering","score_opus":0.03408832669225226,"score_gpt":0.2782604388812595,"score_spread":0.24417211218900725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787324491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13720009,0.000019779802,0.85412073,0.00010956696,0.001696308,0.0006778694,0.0000060349553,0.00024014579,0.0059294887],"genre_scores_gemma":[0.94943804,0.0000046291793,0.049719226,0.000032976495,0.00036550005,0.00006536504,0.000014603813,0.00004489145,0.00031477583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990971,0.000018125198,0.00027268604,0.00018329828,0.00014947105,0.00027932785],"domain_scores_gemma":[0.99929094,0.00010320474,0.0000774462,0.00041660626,0.000047736194,0.00006408107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023642126,0.00017143639,0.00025633583,0.000056929464,0.00030170588,0.00015256916,0.00022315868,0.000070021895,0.00009711481],"category_scores_gemma":[0.00021234601,0.00015091339,0.00010234146,0.000023369019,0.000031048083,0.00031878258,0.000043983404,0.00006177812,0.000009478392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028625774,0.00006546038,0.0023788228,0.00009747133,0.0005289013,0.00000779842,0.00030683834,0.9270468,0.048024755,0.015035332,0.00080953655,0.005412023],"study_design_scores_gemma":[0.007570111,0.000017599348,0.015038834,0.000025753836,0.000075146025,5.2206263e-7,0.0000205632,0.9749214,0.0010083901,0.0008464822,0.00026270503,0.00021248344],"about_ca_topic_score_codex":0.00012620527,"about_ca_topic_score_gemma":0.00013377651,"teacher_disagreement_score":0.8122379,"about_ca_system_score_codex":0.00010866558,"about_ca_system_score_gemma":0.000014099252,"threshold_uncertainty_score":0.61540693},"labels":[],"label_agreement":null},{"id":"W2787413105","doi":"10.1109/epec.2017.8286202","title":"An online framework for integration of demand response in residential load management","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Demand response; Load management; Incentive; Computer science; Scheduling (production processes); Reliability (semiconductor); Time horizon; Power consumption; Demand management; Consumption (sociology); Matching (statistics); Operations research; Electric power system; Reliability engineering; Environmental economics; Electricity; Power (physics); Operations management; Business; Engineering; Economics; Microeconomics","score_opus":0.02429012760183366,"score_gpt":0.29132161599563317,"score_spread":0.26703148839379953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787413105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55084676,0.00001724496,0.44686183,0.00014853032,0.00036262072,0.00020805528,0.000004078702,0.00006495565,0.0014859561],"genre_scores_gemma":[0.9349354,0.000033930948,0.0645444,0.000020178097,0.000083664716,0.000036471734,0.00000904966,0.000017944165,0.0003189633],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99937654,0.000021096024,0.00020686243,0.00013192274,0.00012962993,0.00013397296],"domain_scores_gemma":[0.9992905,0.00004672753,0.0000394688,0.0005689563,0.000026708842,0.000027623802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042497992,0.00008907828,0.00011372842,0.00011791826,0.00004368379,0.00004976653,0.00026586876,0.000055032753,0.000030137711],"category_scores_gemma":[0.000096120384,0.00008781908,0.000031092142,0.00004268929,0.000019779809,0.0001874566,0.000047547008,0.00005702706,0.0000031861186],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002487772,0.00031479282,0.0019311999,0.00035361885,0.00020580558,0.000034855868,0.0006756081,0.84010524,0.00967935,0.11310114,0.0053073135,0.02580329],"study_design_scores_gemma":[0.0015644534,0.00024452072,0.5544185,0.000263939,0.000050163937,5.4724575e-7,0.00049582357,0.40642643,0.019611517,0.012540101,0.0040436736,0.00034034773],"about_ca_topic_score_codex":0.00006894839,"about_ca_topic_score_gemma":0.0008239369,"teacher_disagreement_score":0.5524873,"about_ca_system_score_codex":0.00007909096,"about_ca_system_score_gemma":0.0000052473433,"threshold_uncertainty_score":0.3581158},"labels":[],"label_agreement":null},{"id":"W2787646714","doi":"10.1109/ithings-greencom-cpscom-smartdata.2017.83","title":"Double-Q Learning-Based DVFS for Multi-core Real-Time Systems","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"St. Francis Xavier University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Estimator; Energy consumption; Scheme (mathematics); Energy (signal processing); Selection (genetic algorithm); Selection algorithm; Q-learning; Action selection; Algorithm; Reinforcement learning; Artificial intelligence; Engineering; Mathematics","score_opus":0.05451329181833204,"score_gpt":0.2747960816084416,"score_spread":0.22028278979010957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787646714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14035143,0.0001618228,0.52024,0.00029536782,0.006688328,0.0024398873,0.000018064999,0.0061015855,0.3237035],"genre_scores_gemma":[0.9582415,0.000015450983,0.0052590845,0.00001503243,0.00035278243,0.00027497273,0.000035338948,0.00009653445,0.035709254],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992287,0.000005860339,0.00016979195,0.00018920946,0.0001158939,0.00029055023],"domain_scores_gemma":[0.99921507,0.000032497537,0.0000492832,0.0005917954,0.000039110568,0.00007223684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018359508,0.00016228999,0.0001823088,0.000064640444,0.00022186688,0.00017024504,0.00028654636,0.00007085601,0.00006920387],"category_scores_gemma":[0.000025213441,0.00015333942,0.00007184071,0.000026146301,0.000022522887,0.00011152646,0.000045992256,0.00007336433,0.00023939431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017129034,0.000014377619,0.00076476095,0.00013790098,0.000054927623,0.0000037375828,0.000016350705,0.98461676,0.00089390075,0.0014584344,0.01184105,0.00018068797],"study_design_scores_gemma":[0.001672406,0.000027457416,0.0016738663,0.000029234394,0.000019000747,4.3855934e-7,0.000016699583,0.9315259,0.0011298468,0.0000025201873,0.06370292,0.00019974324],"about_ca_topic_score_codex":0.00044506832,"about_ca_topic_score_gemma":0.00005625996,"teacher_disagreement_score":0.8178901,"about_ca_system_score_codex":0.00007026154,"about_ca_system_score_gemma":0.000008074629,"threshold_uncertainty_score":0.62530005},"labels":[],"label_agreement":null},{"id":"W2789321149","doi":"10.1109/tsg.2018.2810830","title":"Data Center Demand Response in Deregulated Electricity Markets","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Chinese University of Hong Kong","keywords":"Demand response; Electricity; Electricity market; Workload; Computer science; Load management; Microeconomics; Data center; Business; Industrial organization; Economics; Engineering","score_opus":0.019481598883329444,"score_gpt":0.2359022073862782,"score_spread":0.21642060850294875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2789321149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60344994,0.000039499333,0.38992956,0.00020077368,0.0035219123,0.00026671542,0.00015418099,0.000517101,0.0019203151],"genre_scores_gemma":[0.99866897,0.00007787211,0.0004574178,0.00014266088,0.00020649584,0.00003306962,0.000026934133,0.000056786703,0.00032980015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984696,0.00014344485,0.00031527178,0.0004025318,0.00022776141,0.00044140534],"domain_scores_gemma":[0.9987344,0.00012289693,0.000021870246,0.0009888886,0.00003338433,0.00009854215],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00054351985,0.00023537943,0.00019651646,0.00042193572,0.00010759372,0.000039619492,0.0004302572,0.000108138396,0.00030363214],"category_scores_gemma":[0.000010433542,0.00025310146,0.000048885588,0.0006479763,0.000059757065,0.0002736724,0.00000581262,0.00026876922,0.00026686458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007140125,0.0012109572,0.0015451869,0.00015843066,0.00082985236,0.00019283741,0.00050292135,0.82676184,0.018852059,0.000022904778,0.1223746,0.02040828],"study_design_scores_gemma":[0.0030596785,0.00033286287,0.065456204,0.00014039202,0.000087764936,0.000044674947,0.000032759515,0.6975003,0.0725918,0.000029694103,0.15980926,0.0009146404],"about_ca_topic_score_codex":0.00003223366,"about_ca_topic_score_gemma":0.0005713994,"teacher_disagreement_score":0.395219,"about_ca_system_score_codex":0.00017850223,"about_ca_system_score_gemma":0.000020916188,"threshold_uncertainty_score":0.99999213},"labels":[],"label_agreement":null},{"id":"W2791314885","doi":"10.1109/tii.2018.2806936","title":"Unsupervised Nonintrusive Extraction of Electrical Vehicle Charging Load Patterns","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart meter; Smart grid; Computer science; Reliability (semiconductor); Metre; Electricity meter; Grid; Real-time computing; Electric vehicle; Interference (communication); Electrical load; Sampling (signal processing); Power (physics); Automotive engineering; Engineering; Electrical engineering; Voltage; Telecommunications","score_opus":0.02505287703280818,"score_gpt":0.23333793901699568,"score_spread":0.2082850619841875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791314885","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48064956,0.000003331575,0.5136311,0.000029146204,0.0022010934,0.00022069295,0.000026068225,0.00023595103,0.003003025],"genre_scores_gemma":[0.99895275,0.00003712711,0.00042487096,0.000055552828,0.00038666886,0.000028517534,0.0000031014947,0.000027950817,0.00008343444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866575,0.00002089805,0.00058088964,0.00008224331,0.0003583375,0.00029188697],"domain_scores_gemma":[0.99937224,0.0000810232,0.000084189654,0.00026697817,0.00011008272,0.00008546592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016786717,0.00018537631,0.00020934068,0.00024919034,0.00010737396,0.000036762052,0.00016082144,0.00019566838,0.00027897628],"category_scores_gemma":[0.000009197933,0.00019536995,0.000088226974,0.0004390724,0.000047529007,0.00038018933,0.0000016440962,0.0004129421,0.00013124326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014649834,0.00016461333,0.00016685332,0.00009856755,0.0003730801,0.0000033847484,0.002539323,0.90396196,0.0046768584,0.00015087737,0.0026844959,0.08503352],"study_design_scores_gemma":[0.001882382,0.00033952532,0.00019580513,0.00010509864,0.00009832134,0.000008093427,0.0004187031,0.6825528,0.3092012,0.0000143024645,0.004829484,0.00035428168],"about_ca_topic_score_codex":0.00005453862,"about_ca_topic_score_gemma":0.000017932998,"teacher_disagreement_score":0.5183032,"about_ca_system_score_codex":0.00029455306,"about_ca_system_score_gemma":0.000049781316,"threshold_uncertainty_score":0.7966956},"labels":[],"label_agreement":null},{"id":"W2791838709","doi":"10.3390/en11020452","title":"Big Data Mining of Energy Time Series for Behavioral Analytics and Energy Consumption Forecasting","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":230,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Energy consumption; Data mining; Cluster analysis; Context (archaeology); Time series; Support vector machine; Data stream mining; Energy (signal processing); Multilayer perceptron; Naive Bayes classifier; Machine learning; Big data; Perceptron; Artificial intelligence; Artificial neural network; Statistics; Engineering","score_opus":0.0881932956125111,"score_gpt":0.2560202266840608,"score_spread":0.16782693107154972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791838709","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95399386,0.0008972714,0.040221546,0.000032676362,0.0014227723,0.000047938836,0.0001259348,0.00036354674,0.0028944514],"genre_scores_gemma":[0.9839032,0.00022816163,0.013817466,0.000018193692,0.00065023155,0.000021968186,0.00022647981,0.000051594823,0.0010827013],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914956,0.000012913847,0.00025624348,0.00022844922,0.00011809465,0.00023473101],"domain_scores_gemma":[0.99934554,0.00007111052,0.0000604975,0.00042302487,0.000056455076,0.000043366555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011940188,0.00016554983,0.00021200474,0.0001500244,0.00007629306,0.000037844948,0.00021875455,0.00006328709,0.0000225054],"category_scores_gemma":[0.000024284525,0.00017575466,0.000028087492,0.000118042466,0.00014894371,0.00024116194,0.00023511687,0.00002320319,9.4515894e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017756213,0.000117620104,0.005555165,0.00053742883,0.0008807835,0.00002070192,0.0012890426,0.406459,0.024922116,0.020881664,0.05596093,0.48319796],"study_design_scores_gemma":[0.0006602502,0.00028570835,0.00096271245,0.00011939666,0.00023767559,0.00001562319,0.00027281969,0.7321269,0.0619661,0.00021213354,0.20256712,0.00057356496],"about_ca_topic_score_codex":0.000075779506,"about_ca_topic_score_gemma":0.00036624222,"teacher_disagreement_score":0.4826244,"about_ca_system_score_codex":0.000022695003,"about_ca_system_score_gemma":0.00000999804,"threshold_uncertainty_score":0.7167067},"labels":[],"label_agreement":null},{"id":"W2793519996","doi":"10.1787/6ad4d5e3-en","title":"Leveraging the Smart Grid","year":2018,"lang":"en","type":"paratext","venue":"OECD environment working papers","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"University of Ottawa","keywords":"Smart grid; Electricity; Consumption (sociology); Environmental economics; Demand response; Electricity demand; Grid; Business; Computer science; Economics; Engineering; Geography; Electricity generation; Electrical engineering; Power (physics)","score_opus":0.011018346204915427,"score_gpt":0.1732292297382272,"score_spread":0.16221088353331176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793519996","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008567432,0.0027847707,0.00061296666,0.0003283332,0.017517233,0.00039248902,0.000011054794,0.00029445544,0.97720194],"genre_scores_gemma":[0.23729455,0.027746277,0.0014470204,0.002453186,0.01909917,0.00082297897,0.0010558679,0.0012804568,0.7088005],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975892,0.000065109125,0.0004060114,0.00059788534,0.0005685761,0.0007732581],"domain_scores_gemma":[0.99857384,0.000084834384,0.00010153017,0.001124487,0.000002213621,0.000113066766],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00027324058,0.0006859466,0.00040450072,0.00012474974,0.00030241502,0.00014162196,0.00078936503,0.00028187176,0.016384136],"category_scores_gemma":[0.0000027757649,0.0005723471,0.00022108629,0.00009064834,0.0001965917,0.000039267925,0.00033061317,0.00065264903,0.037813634],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031749785,0.000010621821,0.0000765795,0.000047425765,0.00031285675,0.000007950445,0.00016162585,0.37532896,0.00015837685,0.00001229878,0.6167889,0.007091215],"study_design_scores_gemma":[0.00017128997,0.000016776163,0.0004892676,0.0001345637,0.00010377469,0.000003663034,0.00006039487,0.0015828935,0.00021773377,0.0000047178146,0.9965633,0.0006516038],"about_ca_topic_score_codex":0.00001543826,"about_ca_topic_score_gemma":0.0000049566524,"teacher_disagreement_score":0.37977442,"about_ca_system_score_codex":0.0005836905,"about_ca_system_score_gemma":0.000010846903,"threshold_uncertainty_score":0.9996728},"labels":[],"label_agreement":null},{"id":"W2794165757","doi":"10.1016/j.automatica.2018.11.029","title":"An integral control formulation of mean field game based large scale coordination of loads in smart grids","year":2018,"lang":"en","type":"preprint","venue":"Automatica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Robustness (evolution); Nash equilibrium; Computer science; Smoothing; Piecewise; Control theory (sociology); Mathematics; Control (management); Mathematical analysis","score_opus":0.006519868595403304,"score_gpt":0.23225839388576028,"score_spread":0.22573852529035698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794165757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74554,0.000018062645,0.25117418,0.00008678098,0.00057617965,0.0004212062,0.000030352345,0.00022698368,0.0019262343],"genre_scores_gemma":[0.99538225,0.000002265637,0.0042650932,0.00003775743,0.00007458475,0.00006624918,0.00012540039,0.00003444696,0.000011972961],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862885,0.000067121044,0.0006274693,0.00020250912,0.0002594259,0.00021462307],"domain_scores_gemma":[0.9990214,0.00011165467,0.00015782846,0.0005660969,0.00009975867,0.000043265936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004767851,0.00021057088,0.00044153695,0.00035263048,0.000010885185,0.000016881706,0.00026574847,0.00023416313,0.00013677505],"category_scores_gemma":[0.00006553262,0.00022128441,0.000098753655,0.0001613124,0.00002472597,0.000111539535,0.00007389195,0.00020045693,0.000006468544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007514814,0.00044294554,0.0306659,0.0028958311,0.000252658,0.0000036059696,0.0020038802,0.95074016,0.0027227981,0.0028635848,0.0022062247,0.005127258],"study_design_scores_gemma":[0.00084189745,0.00010676928,0.057499226,0.00033208972,0.00005194371,1.5911564e-7,0.000039090988,0.9321627,0.007863417,0.0008328889,0.000095505064,0.00017429894],"about_ca_topic_score_codex":0.00016781484,"about_ca_topic_score_gemma":0.00039085894,"teacher_disagreement_score":0.24984221,"about_ca_system_score_codex":0.000115548384,"about_ca_system_score_gemma":0.000028604074,"threshold_uncertainty_score":0.90237164},"labels":[],"label_agreement":null},{"id":"W2794513987","doi":"10.1049/pbpo130e_ch13","title":"Conservation and demand management in community energy systems","year":2018,"lang":"en","type":"book-chapter","venue":"Institution of Engineering and Technology eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Backup; Incentive; Unit (ring theory); Energy conservation; Order (exchange); Environmental economics; Electricity; Grid; Peak demand; Consumption (sociology); Scale (ratio); Computer science; Economics; Microeconomics; Engineering; Finance; Geography; Mathematics; Electrical engineering","score_opus":0.00906078507614136,"score_gpt":0.17412400849005336,"score_spread":0.165063223413912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794513987","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09362596,0.007166109,0.04461099,0.00006887347,0.0021873654,0.0008234294,0.00002978036,0.0022549753,0.8492325],"genre_scores_gemma":[0.98904324,0.00091371674,0.00057575904,0.00000928941,0.000045028497,0.000057686433,0.000014988069,0.00004868733,0.009291609],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993247,0.00000569875,0.00030386378,0.00014631743,0.00007909158,0.000140325],"domain_scores_gemma":[0.9995849,0.000019575682,0.00005137113,0.00028421247,0.000031999043,0.000027923805],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013977161,0.00023257252,0.0002901571,0.00084073097,0.000045608802,0.000012713875,0.0001129125,0.0003662397,0.000001960229],"category_scores_gemma":[0.000006185223,0.00027145442,0.000016585704,0.00004140198,0.00022029466,0.00003190984,0.00012530465,0.0002867209,0.0000010807356],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038856465,0.0000054640414,0.000034570316,0.00084120233,0.00022023049,0.000022919321,0.000043095766,0.03205704,0.00014221553,0.9618732,0.00021196094,0.004544256],"study_design_scores_gemma":[0.0019604485,0.00026901506,0.00041969342,0.004432863,0.00028426186,0.000134169,0.00020069932,0.24013525,0.0019015287,0.020152755,0.72858036,0.0015289458],"about_ca_topic_score_codex":0.00004765185,"about_ca_topic_score_gemma":0.000064986976,"teacher_disagreement_score":0.9417204,"about_ca_system_score_codex":0.00007041202,"about_ca_system_score_gemma":0.0000058488868,"threshold_uncertainty_score":0.9999738},"labels":[],"label_agreement":null},{"id":"W2794960695","doi":"10.1016/j.apenergy.2018.03.094","title":"Energy consumption analysis of residential swimming pools for peak load shaving","year":2018,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"State Grid Corporation of China; National Natural Science Foundation of China","keywords":"Peaking power plant; Energy consumption; Peak load; Consumption (sociology); Environmental science; Energy (signal processing); Peak demand; Cooling load; Automotive engineering; Engineering; Electricity; Renewable energy; Air conditioning; Statistics; Electrical engineering","score_opus":0.011707427392664404,"score_gpt":0.22192510621610329,"score_spread":0.2102176788234389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794960695","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12553994,0.00024628785,0.8442702,0.000018112229,0.00087643793,0.000101608224,0.000019050318,0.00044015073,0.028488174],"genre_scores_gemma":[0.9969064,0.000084955595,0.0018396511,0.00007123655,0.00047198794,0.00013293818,0.00009908659,0.000055425633,0.00033833148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862254,0.000012206881,0.0004124502,0.0003137595,0.0002824778,0.0003565856],"domain_scores_gemma":[0.9992412,0.000081943006,0.0000900737,0.00043051568,0.000087156506,0.000069129346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016794076,0.00021222253,0.00036268405,0.00044998707,0.0000838886,0.000034919507,0.00023833557,0.0001059725,0.00019621986],"category_scores_gemma":[0.000010271286,0.00024352124,0.0001684607,0.0006021755,0.000069752685,0.00008022899,0.00008599542,0.000040222014,0.00000938003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008660025,0.000055470464,0.00020277052,0.00008811094,0.003175246,0.0000031319787,0.00021475549,0.7256518,0.07081842,0.16988145,0.00660257,0.023219692],"study_design_scores_gemma":[0.0014400894,0.000105455365,0.0062134545,0.000047099835,0.0027597197,0.0000017349342,0.00013515833,0.57902163,0.27081928,0.0014235998,0.1370198,0.001012979],"about_ca_topic_score_codex":0.00044445324,"about_ca_topic_score_gemma":0.0015238997,"teacher_disagreement_score":0.87136644,"about_ca_system_score_codex":0.00014628228,"about_ca_system_score_gemma":0.000015885473,"threshold_uncertainty_score":0.9930508},"labels":[],"label_agreement":null},{"id":"W2795298263","doi":"10.1109/jproc.2018.2809468","title":"Versatile Modeling Platform for Cooperative Energy Management Systems in Smart Cities","year":2018,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Core Research for Evolutional Science and Technology; Waseda University; National Science Foundation","keywords":"Sustainability; Computer science; Photovoltaic system; Energy management; Systems engineering; Energy consumption; Range (aeronautics); Energy (signal processing); Engineering; Electrical engineering; Aerospace engineering","score_opus":0.0175073626536058,"score_gpt":0.20195699188778002,"score_spread":0.1844496292341742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795298263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91866624,0.00019674884,0.01455723,0.00006915809,0.0031243647,0.00071348046,0.000010113747,0.00022559325,0.062437076],"genre_scores_gemma":[0.9981802,0.000038787886,0.0005350893,0.000030129186,0.00021804341,0.00021363371,9.445039e-7,0.0000326524,0.00075048656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919003,0.0000012245575,0.0002493573,0.00014881077,0.00016923172,0.0002413389],"domain_scores_gemma":[0.99971074,0.00001454655,0.000041146428,0.00009453288,0.000115518065,0.000023540731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016812304,0.00014113127,0.00016786574,0.0001259513,0.00006353996,0.00004175893,0.0002995582,0.00004286909,0.0000037169666],"category_scores_gemma":[0.000008915366,0.000116403084,0.000046782352,0.00020267711,0.00004130573,0.00019137975,0.0000734327,0.00004909956,0.000002371001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005340285,0.000023102275,0.00025580314,0.0007117137,0.00021004386,2.9996707e-7,0.0012262296,0.9154193,0.0023932469,0.06333274,0.015873255,0.0005008719],"study_design_scores_gemma":[0.0004183301,0.000043199245,0.00005328391,0.0002014519,0.000026050224,7.4677973e-7,0.001295729,0.97097903,0.019495768,0.0006055474,0.006723978,0.00015688321],"about_ca_topic_score_codex":0.000089937865,"about_ca_topic_score_gemma":0.00003243345,"teacher_disagreement_score":0.079514,"about_ca_system_score_codex":0.00013106539,"about_ca_system_score_gemma":0.0000042598945,"threshold_uncertainty_score":0.47467798},"labels":[],"label_agreement":null},{"id":"W2795589408","doi":"10.1007/978-3-319-89656-4_43","title":"A Tool for Defining and Simulating Storage Strategies on the Smart Grid","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Computer science; Scripting language; Smart grid; Key (lock); Process (computing); Software; Grid; Computer data storage; Distributed computing; Electrical engineering; Operating system; Engineering","score_opus":0.0158727687446121,"score_gpt":0.22066822541112396,"score_spread":0.20479545666651186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795589408","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0073216166,0.00015174111,0.98547506,0.00010940901,0.0018340283,0.0003236426,0.000006254245,0.00014849677,0.0046297396],"genre_scores_gemma":[0.92828315,0.000018503906,0.069027826,0.0008523919,0.0015401139,0.000037610604,0.000007194908,0.00009310488,0.00014007422],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872786,0.000007718426,0.00020755659,0.00044984114,0.00027878935,0.00032821592],"domain_scores_gemma":[0.9986826,0.0007698326,0.00005269601,0.0004164486,0.000045128872,0.000033304856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047186867,0.0002937196,0.00021199844,0.00020089255,0.00018703792,0.00032140105,0.00044850272,0.000107343,0.00001909762],"category_scores_gemma":[0.000062934676,0.0002235408,0.000044734625,0.0001082861,0.0002614061,0.000104329156,0.00021373534,0.0002812845,0.000009037008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026058021,0.0000014829561,0.000009906496,0.000043204906,0.0000117359805,0.0000039278134,0.00030797257,0.96200275,0.000018911229,0.0096219415,0.000096786964,0.027878767],"study_design_scores_gemma":[0.000108112996,0.00009533644,0.00010584992,0.0002673402,0.000008499168,0.0000032087491,0.0000011331955,0.97259754,0.00014213946,0.022328142,0.0040350836,0.00030760397],"about_ca_topic_score_codex":0.0000035242808,"about_ca_topic_score_gemma":0.000034861147,"teacher_disagreement_score":0.92096156,"about_ca_system_score_codex":0.00010871663,"about_ca_system_score_gemma":0.00004132343,"threshold_uncertainty_score":0.91157293},"labels":[],"label_agreement":null},{"id":"W2795934354","doi":"10.1109/tec.2018.2823334","title":"Analysis and Experimental Investigation of the Improved Distributed Electronic Load Controller","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Controller (irrigation); Chopper; Control theory (sociology); Engineering; Power (physics); Voltage; Thyristor; Computer science; Electrical engineering; Control (management)","score_opus":0.004040556483273221,"score_gpt":0.17757701882156537,"score_spread":0.17353646233829215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795934354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5436126,0.000049582868,0.45560992,0.000048107424,0.00040140827,0.00006477617,0.000010089712,0.0000819187,0.00012158237],"genre_scores_gemma":[0.99968165,0.00003515372,0.00003299051,0.00006464054,0.000027951635,0.000018954954,0.0000049724913,0.000012857042,0.00012085593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999345,0.000033546778,0.00015328595,0.0001539998,0.00015364337,0.00016053487],"domain_scores_gemma":[0.9996511,0.000024890134,0.000035843543,0.00019679972,0.000046868663,0.000044545654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006308034,0.000121907025,0.00014192976,0.00012461959,0.00010675756,0.000010585343,0.0000949685,0.000059298894,0.0000655052],"category_scores_gemma":[0.000001043652,0.00010149889,0.00010305028,0.0005115296,0.000116684656,0.00008118775,0.0000021928915,0.000073635776,0.0000025861245],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020246605,0.00007775155,0.00034654487,0.000021865126,0.0019129196,4.7767656e-7,0.00036484076,0.537853,0.45632905,0.00031059564,0.00042431153,0.002156199],"study_design_scores_gemma":[0.00058360636,0.0000748623,0.00066353835,0.0000053441267,0.00019785289,3.783783e-7,0.000041785956,0.31842747,0.6792552,0.000012031962,0.00065331336,0.00008460976],"about_ca_topic_score_codex":0.00022789036,"about_ca_topic_score_gemma":0.00019265393,"teacher_disagreement_score":0.45606902,"about_ca_system_score_codex":0.0002059443,"about_ca_system_score_gemma":0.000018024566,"threshold_uncertainty_score":0.41390046},"labels":[],"label_agreement":null},{"id":"W2796115129","doi":"10.1109/lcomm.2018.2822798","title":"Dynamic Pricing Mechanism in Smart Grid Communications Is Shaping Up","year":2018,"lang":"en","type":"article","venue":"IEEE Communications Letters","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Exfo Electro-Optical Engineering (Canada)","funders":"","keywords":"Dynamic pricing; Smart grid; Computer science; Demand response; Dynamic demand; Electricity; Load management; Supply and demand; Environmental economics; Key (lock); Electricity pricing; Electricity market; Microeconomics; Power (physics); Computer security; Economics","score_opus":0.03698678857456441,"score_gpt":0.26603147157523727,"score_spread":0.22904468300067285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2796115129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61027175,0.0023998043,0.2438034,0.08797871,0.008144327,0.0019675193,0.00007278834,0.0034106025,0.041951086],"genre_scores_gemma":[0.97095287,0.0008935605,0.024331694,0.003354747,0.00006836055,0.00019323092,0.00005459474,0.00006989263,0.000081059094],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986858,0.00012247854,0.00044171943,0.00021292857,0.00016660498,0.00037046557],"domain_scores_gemma":[0.99486613,0.00016366327,0.00006439536,0.004791305,0.000052316434,0.000062212086],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033926265,0.0002140572,0.00019899105,0.0004016721,0.0003455297,0.00007132597,0.0026150444,0.00007091602,0.000038307517],"category_scores_gemma":[0.000020375299,0.00026682575,0.00006821739,0.00067567994,0.00025751162,0.00025457484,0.00060917676,0.0004088701,0.00027436],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036397483,0.0008201297,0.0070372564,0.00046442662,0.0015348077,0.000020174475,0.037514053,0.11599529,0.49177632,0.061925832,0.2513578,0.031517543],"study_design_scores_gemma":[0.0005778035,0.000020413605,0.0042238105,0.00020835604,0.00004810112,0.0000075868825,0.00035863247,0.88912195,0.0034995337,0.0005478864,0.10076523,0.0006206727],"about_ca_topic_score_codex":0.00019736984,"about_ca_topic_score_gemma":0.0013419623,"teacher_disagreement_score":0.77312666,"about_ca_system_score_codex":0.00038356034,"about_ca_system_score_gemma":0.000013714633,"threshold_uncertainty_score":0.9999784},"labels":[],"label_agreement":null},{"id":"W2796211844","doi":"","title":"UPS Delivery System","year":2001,"lang":"en","type":"article","venue":"PDXScholar  (Portland State University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Delivery system; Computer science; Medicine; Biomedical engineering","score_opus":0.00477115524202574,"score_gpt":0.13143943993936905,"score_spread":0.12666828469734331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2796211844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79872525,0.000099581644,0.010962084,0.00001846388,0.0005670316,0.00010452534,0.0000116606425,0.00085716834,0.18865421],"genre_scores_gemma":[0.99077404,0.0006223099,0.00028848747,0.000018230363,0.00007323436,6.173421e-7,0.000025513567,0.000031367756,0.00816622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917084,0.000027407841,0.0001287556,0.00019824838,0.00016801622,0.00030671878],"domain_scores_gemma":[0.9995043,0.00001507382,0.000026457477,0.0002716967,0.00004339948,0.00013907207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000111838664,0.00016240073,0.00015489312,0.00031856663,0.000119338976,0.00004801971,0.00022880515,0.000051054783,0.00005283611],"category_scores_gemma":[0.0000033601941,0.00018489765,0.00006427627,0.00042471732,0.000018080429,0.00039592423,0.00006885153,0.0001666699,0.0001886948],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001457894,0.00007983952,0.095322266,0.00030318764,0.00071928167,0.009847029,0.00049798336,0.85623026,0.00049147237,0.006632278,0.0154712135,0.014259396],"study_design_scores_gemma":[0.00069106085,0.000022607754,0.014140429,0.000033626136,0.00005295329,0.000033716748,0.00047939163,0.02193885,0.00015866273,0.000010377673,0.9620995,0.00033885377],"about_ca_topic_score_codex":0.00005707239,"about_ca_topic_score_gemma":0.00007343974,"teacher_disagreement_score":0.9466283,"about_ca_system_score_codex":0.00023757137,"about_ca_system_score_gemma":0.000011720079,"threshold_uncertainty_score":0.75399077},"labels":[],"label_agreement":null},{"id":"W2797042681","doi":"10.6000/1927-5129.2018.14.13","title":"An Estimation of the Impact of Uninterpretable Power Supply Systems on Electricity Distribution Utility of Pakistan","year":2018,"lang":"en","type":"article","venue":"Journal of Basic & Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic shortage; Electricity; Estimation; Power (physics); Mains electricity; Electricity generation; Business; Load Shedding; Environmental economics; Economics; Automotive engineering; Electric power system; Electrical engineering; Engineering","score_opus":0.008498169121823483,"score_gpt":0.2628050172761412,"score_spread":0.2543068481543177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797042681","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9696324,0.000033992445,0.025919953,0.000008037236,0.0002536132,0.000097404205,0.000016283628,0.000008025065,0.0040303217],"genre_scores_gemma":[0.9998258,0.000003145997,0.00012965481,0.000001917028,0.000031273743,0.0000010367119,0.0000010000897,0.000004049184,0.0000021604542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987867,0.000042606884,0.0004828581,0.00008370977,0.00046071326,0.00014343986],"domain_scores_gemma":[0.9991754,0.00005649911,0.0004016533,0.00020047017,0.00012649661,0.000039426995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001188775,0.000088918285,0.00022611456,0.00009953892,0.000054666536,0.000021138414,0.00037448868,0.000031485277,0.000026831885],"category_scores_gemma":[0.000031467476,0.000054607295,0.000086846616,0.000560915,0.00026272627,0.00016484335,0.000019006435,0.00008834695,5.0788026e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008937726,0.0001280054,0.0073707895,0.000048705908,0.00006728659,2.4234993e-7,0.00023898957,0.9439729,0.040074974,0.0060500647,0.00065249496,0.0013062033],"study_design_scores_gemma":[0.00029698657,0.0011641218,0.24769074,0.0001551307,0.000040393017,0.000005507037,0.00036232613,0.56758004,0.18192086,0.00063039386,0.000045755387,0.00010774306],"about_ca_topic_score_codex":0.00010681594,"about_ca_topic_score_gemma":0.0000063131147,"teacher_disagreement_score":0.3763928,"about_ca_system_score_codex":0.00010553197,"about_ca_system_score_gemma":0.000071113245,"threshold_uncertainty_score":0.22268209},"labels":[],"label_agreement":null},{"id":"W2797781454","doi":"10.1016/j.energy.2018.04.037","title":"Robust cost-risk tradeoff for day-ahead schedule optimization in residential microgrid system under worst-case conditional value-at-risk consideration","year":2018,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"Natural Science Foundation of Beijing Municipality; National Natural Science Foundation of China","keywords":"Microgrid; Expected shortfall; Schedule; Robust optimization; Electric power system; Stochastic programming; CVAR; Renewable energy; Electricity market; Demand response; Computer science; Hedge; Mathematical optimization; Electricity; Economics; Risk management; Engineering; Power (physics); Mathematics","score_opus":0.017381945552165372,"score_gpt":0.21521030159529958,"score_spread":0.1978283560431342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797781454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11178773,0.0002801062,0.8843199,0.00009297011,0.001811383,0.00037394467,0.00013687463,0.00037220138,0.0008248761],"genre_scores_gemma":[0.98046196,0.00008157354,0.01708737,0.0000836205,0.0011254189,0.00031867973,0.00057632825,0.00008779006,0.00017729083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833167,0.00016404659,0.0004902129,0.00039454483,0.00022426466,0.00039528753],"domain_scores_gemma":[0.99918383,0.00018270251,0.00012413459,0.0003117234,0.00009671874,0.000100889],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040753046,0.0002614202,0.00024436624,0.00028749005,0.00031263026,0.00010291771,0.000115626266,0.00016978977,0.00014722858],"category_scores_gemma":[0.00006365229,0.00030338473,0.000086073385,0.0002589628,0.00008123911,0.00025949947,0.000052612864,0.00012262631,0.000025167683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038637565,0.00003091007,0.00016916341,0.000035825095,0.000108734894,0.00004607407,0.00007108929,0.9734029,0.00020842678,0.016073477,0.009599652,0.0002150861],"study_design_scores_gemma":[0.0016367352,0.00006127516,0.00062195805,0.00005202126,0.00009066719,0.00010551759,0.00018283496,0.9822339,0.0081467815,0.00022603126,0.0062983283,0.00034395317],"about_ca_topic_score_codex":0.00043073116,"about_ca_topic_score_gemma":0.0031908087,"teacher_disagreement_score":0.8686742,"about_ca_system_score_codex":0.0005843715,"about_ca_system_score_gemma":0.0000362662,"threshold_uncertainty_score":0.9999418},"labels":[],"label_agreement":null},{"id":"W2798676575","doi":"10.1109/icit.2018.8352351","title":"Enabling winter behavior analysis on electrically heated residential buildings by smart sub-metering","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metering mode; Smart grid; Context (archaeology); Variety (cybernetics); Computer science; Limiting; Consistency (knowledge bases); Electricity; Load management; Systems engineering; Architectural engineering; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.006679134794632878,"score_gpt":0.21403654235305442,"score_spread":0.20735740755842152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2798676575","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92513674,0.000031248474,0.067644395,0.000050801904,0.00046404812,0.00012860232,0.0000025461734,0.00075633096,0.005785285],"genre_scores_gemma":[0.9973697,0.000023162935,0.0010589238,0.00016158252,0.0002503648,0.00004163743,0.000023252496,0.000057661593,0.0010137322],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99851644,0.000022324093,0.000327139,0.00036709703,0.00029039188,0.0004766157],"domain_scores_gemma":[0.99939203,0.000031415668,0.000027360418,0.0003816564,0.000056677272,0.000110861365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017332085,0.00023728487,0.00025977226,0.0006237552,0.00008762136,0.00013293534,0.00024740002,0.00008362587,0.0005790748],"category_scores_gemma":[0.000019049781,0.0002371663,0.00015641103,0.0012234786,0.000029160708,0.00014740559,0.0000772711,0.00014562144,0.00015913093],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008784798,0.00013456732,0.0098846005,0.000026737967,0.0022224444,0.00005049032,0.00011252043,0.038391646,0.860632,0.00022295785,0.08291849,0.0053156787],"study_design_scores_gemma":[0.0005251415,0.00027268525,0.014522843,0.00002182322,0.0009228996,0.0000032526768,0.00001877329,0.039232712,0.91970336,0.000009479963,0.024098862,0.00066813576],"about_ca_topic_score_codex":0.0001867858,"about_ca_topic_score_gemma":0.00016604454,"teacher_disagreement_score":0.07223294,"about_ca_system_score_codex":0.00016945391,"about_ca_system_score_gemma":0.0000042786996,"threshold_uncertainty_score":0.9671361},"labels":[],"label_agreement":null},{"id":"W2799921325","doi":"10.1109/tpwrs.2018.2834913","title":"A Dynamical Systems Approach to Modeling and Analysis of Transactive Energy Coordination","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Population; Grid; Computer science; Synchronization (alternating current); Distributed generation; Mathematical optimization; Distributed computing; Engineering; Mathematics; Renewable energy","score_opus":0.010237031135766165,"score_gpt":0.20365302260493903,"score_spread":0.19341599146917288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799921325","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033085223,0.0000933113,0.9612338,0.000009055086,0.0015200535,0.00023755708,0.00005693345,0.00019777333,0.0035663121],"genre_scores_gemma":[0.9992399,0.00001156516,0.0002825951,0.000009401801,0.000021379376,0.00017386202,0.00000693026,0.00004255327,0.00021178728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986359,0.00006674023,0.00042680453,0.00032690231,0.00030421058,0.00023943112],"domain_scores_gemma":[0.9993371,0.000039949166,0.000038755436,0.00033832062,0.00012328275,0.00012258676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001898679,0.00022046751,0.00044402905,0.00094151095,0.00007964399,0.00005358845,0.0001318812,0.00011716992,0.000006797176],"category_scores_gemma":[0.0000012155479,0.00022550781,0.00012090071,0.0011426815,0.00003784804,0.00013169277,9.84187e-7,0.00009524059,0.0000048387624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024968764,0.00007064471,0.0000033577758,0.00006502815,0.0013962897,5.3819e-7,0.00064973504,0.99592495,0.00081036997,0.0008481023,0.000045823945,0.00016017642],"study_design_scores_gemma":[0.00020917105,0.00009788856,0.000027552025,0.00004516733,0.0004907045,0.0000035742914,0.0005280044,0.9975003,0.00058094686,0.000001688495,0.00030188216,0.00021313032],"about_ca_topic_score_codex":0.0005741826,"about_ca_topic_score_gemma":0.000073675976,"teacher_disagreement_score":0.9661547,"about_ca_system_score_codex":0.00016941328,"about_ca_system_score_gemma":0.000008072579,"threshold_uncertainty_score":0.91959417},"labels":[],"label_agreement":null},{"id":"W2800756770","doi":"10.1109/tia.2018.2828379","title":"A Bidding Strategy for Virtual Power Plants With the Intraday Demand Response Exchange Market Using the Stochastic Programming","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut National de la Recherche Scientifique; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Office of Electricity Delivery and Energy Reliability; U.S. Department of Energy","keywords":"Bidding; Demand response; Virtual power plant; Stochastic programming; Computer science; Mathematical optimization; Microeconomics; Economics; Engineering; Mathematics; Electrical engineering; Renewable energy; Electricity","score_opus":0.025871576384925075,"score_gpt":0.25718227717739783,"score_spread":0.23131070079247276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800756770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053990655,0.00001688835,0.9435904,0.00038405583,0.00022007448,0.0012437345,0.00008108282,0.00022106213,0.00025202933],"genre_scores_gemma":[0.9956835,0.0000026395805,0.00093346735,0.000078745616,0.00023317827,0.00259793,0.000003026705,0.000058423102,0.0004090874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989803,0.0000622168,0.00018731768,0.00024458003,0.0001834864,0.00034213386],"domain_scores_gemma":[0.99896234,0.00037975796,0.000047448037,0.00048548006,0.000051597242,0.00007339643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039109058,0.00021075156,0.00011554656,0.00012000553,0.00078739,0.00010305685,0.00028686368,0.00016125046,0.00010986339],"category_scores_gemma":[0.0000030346268,0.00014317074,0.00004803143,0.00041791878,0.00019288585,0.00010892812,0.0000026252478,0.0004699862,0.000008406483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002442574,0.00006314356,9.905355e-7,0.000012729664,0.00017686532,7.424806e-7,0.0004513839,0.9849336,0.00087989366,0.00013377196,0.0018469082,0.01125572],"study_design_scores_gemma":[0.0019421921,0.0010318585,0.00058779854,0.00022126223,0.0005649764,0.0001284756,0.0084065655,0.8182783,0.012486201,0.000095576135,0.15508428,0.0011725097],"about_ca_topic_score_codex":0.000011620292,"about_ca_topic_score_gemma":0.00006709829,"teacher_disagreement_score":0.94265693,"about_ca_system_score_codex":0.00012339701,"about_ca_system_score_gemma":0.000043531203,"threshold_uncertainty_score":0.6056047},"labels":[],"label_agreement":null},{"id":"W2801294343","doi":"10.1109/sasg.2017.8356511","title":"Energy storage systems integration with household: A case study of average Ontario household using lead acid battery","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Residence; Lead–acid battery; Energy storage; Battery (electricity); Electricity; Environmental economics; Lead (geology); Energy (signal processing); Computer science; Environmental science; Engineering; Electrical engineering; Economics; Power (physics); Mathematics","score_opus":0.046215187649369376,"score_gpt":0.21630432587931148,"score_spread":0.1700891382299421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801294343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8486609,0.000029657864,0.14797033,0.0000026045616,0.0007212401,0.00022629644,0.000004064492,0.00024851042,0.002136408],"genre_scores_gemma":[0.998312,0.0000029126566,0.000521933,0.000012919504,0.00012281582,0.000042326796,0.0000032747814,0.00008334536,0.0008984514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877524,0.00003717114,0.00034458408,0.00028337835,0.0002939289,0.0002657037],"domain_scores_gemma":[0.99864954,0.00001670815,0.00013968657,0.001088776,0.000036374393,0.00006892911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001598879,0.00028416433,0.00034322462,0.00019806257,0.00020736616,0.0001970341,0.00025935468,0.00006949906,0.000014632188],"category_scores_gemma":[0.0000041098833,0.00024004566,0.000042378488,0.00007681178,0.000033164804,0.00047015317,0.000103968516,0.00015333509,0.0000012667416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015916568,0.0001345688,0.0054072533,0.000046942045,0.00021441004,0.001909495,0.0011706438,0.9888679,0.0015753217,0.000102575854,0.00033593626,0.00021906091],"study_design_scores_gemma":[0.0045195227,0.00094149244,0.013251617,0.00040881633,0.00043859318,0.0016998587,0.010987187,0.9546049,0.009426043,0.000003613107,0.0021717043,0.0015466168],"about_ca_topic_score_codex":0.22793503,"about_ca_topic_score_gemma":0.3116697,"teacher_disagreement_score":0.14965114,"about_ca_system_score_codex":0.00039333478,"about_ca_system_score_gemma":0.000027570215,"threshold_uncertainty_score":0.9788778},"labels":[],"label_agreement":null},{"id":"W2803349034","doi":"10.1145/3208903.3212029","title":"Flattening the Duck Curve Using Grid-friendly Solar Panel Orientation","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Grid; Flattening; Environmental science; Flexibility (engineering); Photovoltaic system; Thermal; Orientation (vector space); Automotive engineering; Computer science; Meteorology; Engineering; Electrical engineering; Mechanical engineering; Geology; Mathematics; Geodesy; Physics","score_opus":0.025725371388778933,"score_gpt":0.23328315388639492,"score_spread":0.207557782497616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803349034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6441741,0.000045144337,0.32499897,0.00010938358,0.0038844561,0.00015150289,0.0000018701066,0.0005400623,0.026094485],"genre_scores_gemma":[0.99233305,0.000008924991,0.005585629,0.0001414756,0.0012859465,0.000008806254,0.000008670198,0.000037079157,0.00059040176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927014,0.000020649892,0.0001408992,0.00015072293,0.000167727,0.00024985787],"domain_scores_gemma":[0.9995899,0.000029237497,0.000021122582,0.0002796675,0.00004294909,0.000037129153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018344854,0.00012317384,0.000079222096,0.000057909157,0.00015960737,0.00005889534,0.00015454253,0.00003446446,0.00016790211],"category_scores_gemma":[0.000016886037,0.00009307773,0.00003441006,0.00023033044,0.000045827783,0.00020134369,0.000064244756,0.00008227395,0.00014886285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015219477,0.00002751237,0.004868318,0.000053101456,0.000304737,0.000016371221,0.0028356633,0.8708596,0.023770355,0.006912757,0.08057716,0.009759159],"study_design_scores_gemma":[0.00032010244,0.000045979566,0.00849355,0.000025760875,0.000054691267,0.000011081931,0.00073564076,0.878379,0.021450507,0.00011957323,0.090023905,0.00034021036],"about_ca_topic_score_codex":0.00013254344,"about_ca_topic_score_gemma":0.00009806241,"teacher_disagreement_score":0.34815893,"about_ca_system_score_codex":0.00007349746,"about_ca_system_score_gemma":0.000006254292,"threshold_uncertainty_score":0.37955996},"labels":[],"label_agreement":null},{"id":"W2807544181","doi":"10.1109/fmec.2018.8364080","title":"Artificial intelligence framework for smart city microgrids: State of the art, challenges, and opportunities","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":76,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Gnowit (Canada)","funders":"","keywords":"Scalability; Computer science; Microgrid; Inference; Smart grid; Smart city; Edge computing; Data science; Mainstream; Information and Communications Technology; Big data; Enhanced Data Rates for GSM Evolution; Internet of Things; Artificial intelligence; Computer security; Engineering; World Wide Web; Database","score_opus":0.0951375276026951,"score_gpt":0.2569306696294922,"score_spread":0.16179314202679707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807544181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1290383,0.0032464494,0.8243271,0.0037212514,0.0033014594,0.00077110913,0.000036893376,0.00045367802,0.035103753],"genre_scores_gemma":[0.9854935,0.0028196408,0.010539047,0.00018580917,0.00028866838,0.000043431504,0.0000023451003,0.000030442236,0.00059715146],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999391,0.000012667333,0.00020341108,0.000121973535,0.00009049512,0.00018045856],"domain_scores_gemma":[0.9995467,0.0000819817,0.000027616696,0.0002600052,0.000045474848,0.00003821933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019223907,0.00010762548,0.00011657616,0.000041396215,0.00004667348,0.000016843733,0.00014913117,0.000038482678,0.000056053545],"category_scores_gemma":[0.000028020386,0.000082724764,0.00003804955,0.00004578685,0.00019830678,0.00005409977,0.00008411805,0.00006530054,0.000006639649],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027720114,0.000045386176,0.00005962479,0.00021485613,0.00016376057,0.0000010435604,0.0012430093,0.0025201787,0.00034211128,0.4299108,0.0054744035,0.5599971],"study_design_scores_gemma":[0.000090411064,0.0002687816,0.0035844822,0.00020747159,0.000072989125,0.0000045197844,0.0013632178,0.05040925,0.17384586,0.41455084,0.35496998,0.00063222536],"about_ca_topic_score_codex":0.000007682905,"about_ca_topic_score_gemma":0.00016681901,"teacher_disagreement_score":0.85645515,"about_ca_system_score_codex":0.00001487081,"about_ca_system_score_gemma":0.0000069954194,"threshold_uncertainty_score":0.33734182},"labels":[],"label_agreement":null},{"id":"W2808604553","doi":"10.1016/j.apenergy.2018.06.040","title":"Optimal scheduling of a microgrid in a volatile electricity market environment: Portfolio optimization approach","year":2018,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Microgrid; Electricity; Electricity market; Computer science; Renewable energy; Photovoltaic system; Scheduling (production processes); Grid; Demand response; Mathematical optimization; Engineering; Electrical engineering","score_opus":0.004577644194704534,"score_gpt":0.16410749931477175,"score_spread":0.15952985512006723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808604553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11816674,0.00018407458,0.7905035,0.0000036888937,0.00010591073,0.00012104324,0.0000024809751,0.00015934806,0.090753205],"genre_scores_gemma":[0.87363154,0.00019185367,0.12573984,0.000024582436,0.00015310624,0.000086820444,0.00003719161,0.000050434654,0.00008462367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988704,0.000014769147,0.0003324846,0.00027084307,0.00017541011,0.0003361296],"domain_scores_gemma":[0.9995666,0.000017313947,0.000058646692,0.0002927387,0.000011546495,0.000053124997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000147498,0.0001966019,0.00022783453,0.00025578827,0.000030706484,0.000014169291,0.00018345482,0.00010183018,0.00027059452],"category_scores_gemma":[0.000003562939,0.00022687018,0.000040791765,0.00041730786,0.000055806275,0.00006937867,0.000076612894,0.00008954597,0.0000050228095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029566456,0.00007293284,0.00011467096,0.00002152398,0.000046795398,0.00000129265,0.000044811088,0.99238026,0.003392864,0.0016268856,0.00052508723,0.001743299],"study_design_scores_gemma":[0.00041042385,0.000028947636,0.00033811716,0.000007006598,0.000015793179,0.0000016155697,0.00002640839,0.9755084,0.019773362,0.000030225128,0.0036433628,0.000216325],"about_ca_topic_score_codex":0.000063221545,"about_ca_topic_score_gemma":0.0000059132303,"teacher_disagreement_score":0.7554648,"about_ca_system_score_codex":0.000112922084,"about_ca_system_score_gemma":0.000010281663,"threshold_uncertainty_score":0.92514974},"labels":[],"label_agreement":null},{"id":"W2808736933","doi":"10.1109/tsg.2018.2848727","title":"Real-Time Emulation of Residential Buildings by Hardware Solution of Multi-Layer Model","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Emulation; Modular design; Computer science; Grid; Layer (electronics); Energy consumption; Embedded system; Real-time computing; Simulation; Engineering; Operating system","score_opus":0.018346178812134652,"score_gpt":0.23792520231086445,"score_spread":0.2195790234987298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808736933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20201197,0.000011116544,0.7956238,0.000031470816,0.0011798926,0.00016816855,0.00010050345,0.00022188826,0.0006511959],"genre_scores_gemma":[0.9901541,0.00007267342,0.008683935,0.000009436742,0.00013871538,0.000028331819,0.000018361694,0.00005416168,0.0008402865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987912,0.00002691283,0.00042219044,0.00022834273,0.00029824523,0.00023310685],"domain_scores_gemma":[0.9993538,0.000027145232,0.00007742562,0.00035248557,0.00012794555,0.00006120112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014418889,0.00018872965,0.00024297406,0.00025146126,0.00009017868,0.000011877454,0.0001505956,0.00011639694,0.0001457325],"category_scores_gemma":[0.0000030331587,0.0002162736,0.00012357332,0.00026114334,0.000082657076,0.0002375678,0.0000025008092,0.000114578004,0.00006051532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041876527,0.00007095734,0.000008861632,0.000039399256,0.0000736109,2.62556e-7,0.00012415268,0.67958975,0.3110209,0.000011475562,0.008482412,0.0005363599],"study_design_scores_gemma":[0.00042145076,0.00006136885,0.00021774763,0.000036832735,0.0000573334,6.599363e-7,0.00000789453,0.6292007,0.36940825,0.000009481853,0.00044555753,0.00013272728],"about_ca_topic_score_codex":0.00030871673,"about_ca_topic_score_gemma":0.00009415144,"teacher_disagreement_score":0.78814214,"about_ca_system_score_codex":0.00010746259,"about_ca_system_score_gemma":0.00001608142,"threshold_uncertainty_score":0.8819382},"labels":[],"label_agreement":null},{"id":"W2811094277","doi":"10.1002/9781119422099.ch6","title":"Integrated Planning and Operational Control Of Resilient MEG For Optimal DERs Sizing and Enhanced Dynamic Performance","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Sizing; Renewable energy; Computer science; Reliability engineering; Distributed generation; Controller (irrigation); Engineering; Automotive engineering; Control engineering; Electrical engineering","score_opus":0.0065495357267197525,"score_gpt":0.2196357824340182,"score_spread":0.21308624670729845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811094277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026280886,0.0035431192,0.77468276,0.000030326308,0.0006260033,0.00084773265,0.000063296306,0.00031164312,0.19361421],"genre_scores_gemma":[0.9209916,0.00036770423,0.0132398885,0.000022482322,0.00007517233,0.00009568404,0.00006996271,0.00019455716,0.06494295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994546,0.000005279068,0.00013640292,0.00017576496,0.0000814408,0.00014649417],"domain_scores_gemma":[0.99971247,0.00003061495,0.000055355955,0.00014909454,0.000019844592,0.000032601936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000077232406,0.00018158132,0.00024156088,0.00013209041,0.000046499423,0.000034057146,0.00008890521,0.00009844003,0.000042937078],"category_scores_gemma":[0.000015839392,0.00016546412,0.000020317113,0.00001815461,0.000047819187,0.00005700928,0.000026285978,0.00007031339,7.06314e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009562667,0.000014681268,0.00038004803,0.001232178,0.0007795784,0.0000023449634,0.00019420501,0.9354735,0.0050515016,0.00049298105,0.043970563,0.012312796],"study_design_scores_gemma":[0.0010097604,0.00005448818,0.00052250404,0.00043917928,0.0000457013,0.000001167453,0.00005509753,0.9533151,0.0010220599,0.0000013059552,0.043299146,0.00023451955],"about_ca_topic_score_codex":0.000025125608,"about_ca_topic_score_gemma":0.00005599673,"teacher_disagreement_score":0.8947107,"about_ca_system_score_codex":0.00003108357,"about_ca_system_score_gemma":0.000011454887,"threshold_uncertainty_score":0.6747431},"labels":[],"label_agreement":null},{"id":"W2833907136","doi":"10.1007/978-3-319-94965-9_3","title":"Heuristics-Based Detection of Abnormal Energy Consumption","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mount Royal University","funders":"","keywords":"Heuristics; Abnormality; Consumption (sociology); Energy consumption; Computer science; Electricity; Energy (signal processing); Mains electricity; Engineering; Psychology; Statistics; Mathematics; Social psychology; Voltage; Electrical engineering","score_opus":0.017779238088322595,"score_gpt":0.21232263513031585,"score_spread":0.19454339704199325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2833907136","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069640286,0.00025928632,0.996363,0.000035302626,0.0008165235,0.00017506056,0.000046592504,0.000077262855,0.0015306121],"genre_scores_gemma":[0.3053816,0.00026843106,0.6937513,0.000072969626,0.00032832558,0.00003095856,0.000079135105,0.000043523996,0.000043787943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991092,0.000004749537,0.0004920764,0.00007661067,0.0001720305,0.00014533295],"domain_scores_gemma":[0.9991534,0.00013258621,0.00023264354,0.00034468473,0.00011060529,0.000026084519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016983999,0.00020488896,0.00025593617,0.00021257692,0.00027495567,0.000044756,0.00058137433,0.00015966217,0.0000030788433],"category_scores_gemma":[0.00001844473,0.00018483074,0.00012524742,0.0001077138,0.00036422524,0.00011608818,0.00017891063,0.00016709318,4.3540643e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013978303,0.000003985166,0.0000017164798,0.0002907554,0.000064325366,1.9013335e-8,0.00014881695,0.98909426,0.000037401922,0.0046847174,0.000048437607,0.0056241625],"study_design_scores_gemma":[0.00014475171,0.000047404585,0.000043130964,0.00015465853,0.00005921824,0.0000019297643,0.0000010291888,0.9684248,0.0016920767,0.00020600467,0.029031767,0.00019325364],"about_ca_topic_score_codex":0.000017061517,"about_ca_topic_score_gemma":0.000092575254,"teacher_disagreement_score":0.30468518,"about_ca_system_score_codex":0.000064535794,"about_ca_system_score_gemma":0.000037259724,"threshold_uncertainty_score":0.7537179},"labels":[],"label_agreement":null},{"id":"W2874851820","doi":"10.1109/iccw.2018.8403791","title":"Implementation of a Smart Grid Communication System Compliant with IEEE 2030.5","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Smart grid; Transformer; Energy consumption; Computer science; Grid; Embedded system; Reliability engineering; Electrical engineering; Engineering; Voltage","score_opus":0.013070044827689694,"score_gpt":0.23348718855849493,"score_spread":0.22041714373080523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2874851820","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7732255,0.000053075906,0.11817081,0.00012349986,0.00093195523,0.00052327267,0.000013382214,0.00086365966,0.106094874],"genre_scores_gemma":[0.99579847,0.000008698219,0.003954139,0.00001930705,0.000077493285,0.00003191799,0.000014374541,0.000018870824,0.0000767219],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994623,0.000018104214,0.00019284079,0.00007962039,0.00012644287,0.0001206837],"domain_scores_gemma":[0.9994793,0.00001371357,0.00003722691,0.00038062592,0.000062443214,0.000026702073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000111937945,0.000084764375,0.00010510913,0.00006382088,0.0000399533,0.000012755197,0.00014162445,0.000017384198,0.00010395286],"category_scores_gemma":[4.9313485e-7,0.000072488554,0.00001641422,0.0001371184,0.000036683814,0.000085917636,0.000026088588,0.00003136994,0.000057195015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021275501,0.00022607492,0.074158885,0.0029615045,0.00220666,0.000014160628,0.004909468,0.253131,0.025185594,0.14124835,0.4762099,0.01953564],"study_design_scores_gemma":[0.0044559343,0.0012057503,0.16826725,0.0006392132,0.0002892477,0.000041945706,0.015430039,0.3961371,0.32353947,0.00006216466,0.08866206,0.0012698281],"about_ca_topic_score_codex":0.00048863265,"about_ca_topic_score_gemma":0.001599034,"teacher_disagreement_score":0.38754785,"about_ca_system_score_codex":0.00007746511,"about_ca_system_score_gemma":0.000005588328,"threshold_uncertainty_score":0.29559976},"labels":[],"label_agreement":null},{"id":"W2883316859","doi":"10.1016/j.energy.2018.07.132","title":"Optimal collaborative demand-response planner for smart residential buildings","year":2018,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Planner; Demand response; Plan (archaeology); Computer science; Sensitivity (control systems); Work (physics); Outcome (game theory); Scheme (mathematics); Energy consumption; Operations research; Consumption (sociology); Duration (music); Environmental economics; Engineering; Electricity; Microeconomics; Economics","score_opus":0.00608061308011457,"score_gpt":0.2178382976037256,"score_spread":0.21175768452361104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883316859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4687829,0.00030584264,0.5177752,0.00037940888,0.0036639883,0.00020280885,0.000041807012,0.0007463872,0.008101668],"genre_scores_gemma":[0.9815919,0.000026137492,0.011803207,0.00021256114,0.0015071736,0.0001877807,0.000027986833,0.00008402569,0.0045592287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99900913,0.00004413225,0.00019647185,0.00023820341,0.00015862206,0.00035343287],"domain_scores_gemma":[0.999426,0.00011690533,0.000028886181,0.00024448373,0.00009715386,0.00008654783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024540524,0.00018746189,0.00016605448,0.00015070419,0.000121096375,0.000061187515,0.00019584563,0.00008406159,0.00013074519],"category_scores_gemma":[0.00006143135,0.00019426535,0.000056479785,0.00025595125,0.00006648081,0.0001390057,0.000064355285,0.00004625674,0.00004066885],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009953952,0.00002283177,0.000042500986,0.000017302162,0.00022518434,0.000017181394,0.000401242,0.60462224,0.012190335,0.011908502,0.36892116,0.0006361098],"study_design_scores_gemma":[0.0007064524,0.00020442961,0.00050343375,0.000015777618,0.000027924203,0.0000031362295,0.00006997107,0.05837778,0.08421817,0.00014922685,0.8554356,0.00028809762],"about_ca_topic_score_codex":0.000039696857,"about_ca_topic_score_gemma":0.00010429218,"teacher_disagreement_score":0.54624444,"about_ca_system_score_codex":0.00008448845,"about_ca_system_score_gemma":0.00002531034,"threshold_uncertainty_score":0.7921911},"labels":[],"label_agreement":null},{"id":"W2883353101","doi":"10.1109/jsyst.2018.2850882","title":"Power Congestion Management in Integrated Electricity and Gas Distribution Grids","year":2018,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Profit (economics); Scheduling (production processes); Portfolio; Power system simulation; Electric power system; Mathematical optimization; Power (physics); Business; Economics; Microeconomics","score_opus":0.006330227368475889,"score_gpt":0.20184460997266188,"score_spread":0.195514382604186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883353101","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9083995,0.0004123728,0.08137945,0.00005445394,0.0047594486,0.00020849596,0.0000053766325,0.00013451955,0.0046463488],"genre_scores_gemma":[0.99913305,0.0002586665,0.00005719969,0.000009162976,0.00038804315,0.000013217681,0.0000061471214,0.000017053568,0.000117481555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905545,0.00006379084,0.00030720053,0.00012208914,0.00018647937,0.00026498243],"domain_scores_gemma":[0.9996812,0.000011743502,0.00004921598,0.00011120723,0.00006820098,0.00007845435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046669185,0.00013489045,0.00014780213,0.00017892232,0.00006909275,0.000109640256,0.000090276946,0.00006027808,0.00001605487],"category_scores_gemma":[0.000010118854,0.00012396653,0.000022670269,0.00029737403,0.000028291111,0.00015087184,0.000013874539,0.00021133937,0.000025913772],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016023684,0.00016544406,0.015368869,0.00040449444,0.0009002327,0.0006273616,0.00060740457,0.79868865,0.0061960225,0.006154058,0.1477664,0.022960803],"study_design_scores_gemma":[0.0043317634,0.00066265324,0.16428567,0.0012097436,0.00014106142,0.0015163557,0.0006167551,0.59861755,0.004154912,0.000693394,0.22243041,0.0013397116],"about_ca_topic_score_codex":0.000035588222,"about_ca_topic_score_gemma":0.000021733817,"teacher_disagreement_score":0.20007111,"about_ca_system_score_codex":0.00038208385,"about_ca_system_score_gemma":0.000006375426,"threshold_uncertainty_score":0.5055208},"labels":[],"label_agreement":null},{"id":"W2883995124","doi":"10.17775/cseejpes.2018.00500","title":"A demand response system for wind power integration: greenhouse gas mitigation and reduction of generator cycling","year":2018,"lang":"en","type":"article","venue":"CSEE Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Cycling; Greenhouse gas; Reduction (mathematics); Environmental science; Generator (circuit theory); Automotive engineering; Wind power; Power (physics); Electrical engineering; Engineering; Geology; Mathematics; Physics","score_opus":0.0073681934478022305,"score_gpt":0.20521633223563593,"score_spread":0.1978481387878337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883995124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9145913,0.0023668332,0.079153985,0.000040880856,0.0034039444,0.00007541644,0.000004740005,0.000036118698,0.00032674635],"genre_scores_gemma":[0.99843204,0.00010735568,0.0005386557,0.000006102102,0.0007517005,0.0000064781175,0.0000016101251,0.000032309617,0.00012373007],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882823,0.0000957654,0.0006153174,0.00012605982,0.00018529674,0.00014932563],"domain_scores_gemma":[0.9991702,0.000061581275,0.00024178936,0.00014036066,0.0002837944,0.00010226864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081541314,0.00015324102,0.00030879595,0.00025516542,0.00008011435,0.00006510233,0.0000731245,0.000094468436,0.0000025479837],"category_scores_gemma":[0.00004046842,0.0001320477,0.00006376263,0.00012095344,0.000062047504,0.00025027848,0.000016075794,0.00006294276,3.9077747e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031081699,0.00012136819,0.0008715489,0.0014023221,0.0016435989,0.000053052056,0.007306,0.2807117,0.6732926,0.010892624,0.01684407,0.003752941],"study_design_scores_gemma":[0.01209965,0.008211975,0.0101149585,0.007831628,0.0011096327,0.005696686,0.026167195,0.4227672,0.3805844,0.00033355856,0.12277163,0.0023115121],"about_ca_topic_score_codex":0.000017168637,"about_ca_topic_score_gemma":0.0000065117097,"teacher_disagreement_score":0.29270822,"about_ca_system_score_codex":0.0000891815,"about_ca_system_score_gemma":0.00002047586,"threshold_uncertainty_score":0.5384749},"labels":[],"label_agreement":null},{"id":"W2886579254","doi":"10.23919/acc.2018.8431905","title":"Optimal Dynamic Pricing for Binary Demands in Smart Grids: A Fair and Privacy-Preserving Strategy","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Smart grid; Population; Binary number; Markov process; Markov chain; Operator (biology); Operations research; Distributed computing; Mathematics; Engineering","score_opus":0.01057480352835553,"score_gpt":0.2332388773411692,"score_spread":0.22266407381281367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886579254","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92577213,0.00013918083,0.064932205,0.00009865773,0.00026112952,0.0002812901,0.0000016121429,0.00030097718,0.00821282],"genre_scores_gemma":[0.98592156,0.000037257385,0.013372315,0.000032738888,0.00010641511,0.00006981078,0.000007899005,0.00004196635,0.00041001054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909264,0.000010396617,0.00021948294,0.00023620247,0.00008862162,0.00035266572],"domain_scores_gemma":[0.9995953,0.000041695228,0.000016547447,0.00026730084,0.000022070155,0.00005708618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019224141,0.00016401072,0.0001607643,0.00018604622,0.00005439295,0.000052114847,0.00020791654,0.000060693015,0.000050167826],"category_scores_gemma":[0.000025573385,0.00016178942,0.000027813181,0.00019164992,0.000030437172,0.00023389446,0.00023805104,0.00007769201,0.00000764139],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054917393,0.00005273352,0.00851315,0.00050786557,0.00013007638,0.00002156348,0.00064951496,0.970097,0.0064320494,0.001637774,0.0065390794,0.005364293],"study_design_scores_gemma":[0.0005351697,0.00013353162,0.030329423,0.000049959406,0.000010952735,0.0000030330134,0.00021219258,0.9654947,0.0005636901,0.00017556186,0.0022785699,0.00021322152],"about_ca_topic_score_codex":0.000062672465,"about_ca_topic_score_gemma":0.00034681853,"teacher_disagreement_score":0.06014946,"about_ca_system_score_codex":0.0000833895,"about_ca_system_score_gemma":0.000008602976,"threshold_uncertainty_score":0.6597581},"labels":[],"label_agreement":null},{"id":"W2887967389","doi":"10.1049/iet-gtd.2018.5943","title":"Two‐stage stochastic demand response in smart grid considering random appliance usage patterns","year":2018,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Smart grid; Stage (stratigraphy); Computer science; Demand response; Grid; Mathematical optimization; Mathematics; Geology; Engineering; Electrical engineering; Electricity","score_opus":0.016842456973365772,"score_gpt":0.24025930937308465,"score_spread":0.22341685239971887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887967389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38772592,0.000099556484,0.610859,0.0001254802,0.00059854914,0.00026549125,0.00008105033,0.000173904,0.00007106281],"genre_scores_gemma":[0.99786866,0.000059940674,0.0006091001,0.000060488543,0.0004955448,0.00012760547,0.00063112145,0.000035914658,0.00011164972],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833035,0.00017029828,0.00047867052,0.0003629455,0.000285711,0.00037203167],"domain_scores_gemma":[0.9993936,0.0000755596,0.00005046373,0.00028606842,0.00006146471,0.00013288038],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007098746,0.00026036994,0.00023261564,0.00011427769,0.00017372835,0.00008640257,0.00012324627,0.00010496099,0.00024898304],"category_scores_gemma":[0.000042108717,0.00027508877,0.000067218505,0.0002900915,0.00005174047,0.00024022757,0.000018689429,0.00016354733,0.000052700554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005297894,0.000042920907,0.00036493255,0.000055681667,0.00002445692,0.000016047676,0.000216773,0.8818847,0.111700095,0.00016082247,0.0024873407,0.0025164157],"study_design_scores_gemma":[0.0036837496,0.000089691144,0.0069654156,0.00012750487,0.00002798625,0.0000064914575,0.000047693262,0.87284285,0.09264387,0.000035713707,0.023106478,0.0004225284],"about_ca_topic_score_codex":0.00003243574,"about_ca_topic_score_gemma":0.000106034815,"teacher_disagreement_score":0.6102499,"about_ca_system_score_codex":0.00023524178,"about_ca_system_score_gemma":0.00002995002,"threshold_uncertainty_score":0.99997014},"labels":[],"label_agreement":null},{"id":"W2888818189","doi":"10.1109/tpwrs.2018.2867476","title":"A Decentralized Framework for the Optimal Coordination of Distributed Energy Resources","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robustness (evolution); Computer science; Distributed generation; Column generation; Mathematical optimization; Distributed computing; Computation; Linear programming; Decomposition; Integer programming; Engineering; Mathematics; Algorithm; Renewable energy","score_opus":0.010338845015574994,"score_gpt":0.22288540935908352,"score_spread":0.21254656434350852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888818189","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053782803,0.00020634857,0.98923165,0.00009584836,0.0042908336,0.00025737504,0.000097313794,0.00020427314,0.00023807907],"genre_scores_gemma":[0.9986734,0.000030431924,0.00076421944,0.000017975733,0.000059623864,0.00024017734,0.0000049875034,0.000035245364,0.0001739437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913144,0.000034259316,0.00028045423,0.00014494528,0.00018965243,0.00021925515],"domain_scores_gemma":[0.9992185,0.00025607974,0.000052466905,0.00033527095,0.00009355698,0.000044100932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014795751,0.00014319998,0.00017174287,0.000097272794,0.0001341161,0.00004156459,0.00019340389,0.00009577202,0.000046248482],"category_scores_gemma":[0.0000059404074,0.00011475955,0.00010291145,0.00029071985,0.00006517678,0.000063322994,8.821371e-7,0.00007930782,0.000007545751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007363463,0.0000445584,0.0000027195024,0.000042282674,0.0003007114,4.2155352e-7,0.00033599467,0.98970306,0.00035295478,0.004515117,0.0042116027,0.00041692064],"study_design_scores_gemma":[0.0008490534,0.00027724082,0.00012223021,0.00017595096,0.00015728346,0.0000051432767,0.0007926171,0.6881405,0.027498165,0.00007165325,0.28160688,0.00030324448],"about_ca_topic_score_codex":0.00008854705,"about_ca_topic_score_gemma":0.000028102548,"teacher_disagreement_score":0.99329513,"about_ca_system_score_codex":0.00007919327,"about_ca_system_score_gemma":0.000006572994,"threshold_uncertainty_score":0.46797585},"labels":[],"label_agreement":null},{"id":"W2889019546","doi":"10.1016/j.scs.2018.08.029","title":"Optimisation of community shared solar application in energy efficient communities","year":2018,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaic system; Environmental economics; Renewable energy; Greenhouse gas; Environmental science; Grid; Leverage (statistics); Electricity; Unit (ring theory); Solar energy; Business; Computer science; Engineering; Economics; Geography; Electrical engineering","score_opus":0.0077605173410072335,"score_gpt":0.19817215877528943,"score_spread":0.1904116414342822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889019546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9752593,0.00023649895,0.018276803,0.00003824232,0.000051376457,0.000103573046,0.000004553858,0.000091204405,0.005938443],"genre_scores_gemma":[0.99894,0.0002547309,0.00033870325,0.00006798262,0.000037271453,0.000048475285,0.00003758988,0.000014543278,0.0002606897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945265,0.00005222108,0.00015786952,0.000045134853,0.00008674409,0.00020535695],"domain_scores_gemma":[0.99955934,0.00005245708,0.00002719963,0.00023890453,0.00009965217,0.000022433365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031723847,0.00009217363,0.00012389915,0.000048589704,0.00022342782,0.000028616561,0.00012212413,0.00005841373,0.000013183825],"category_scores_gemma":[0.000005273227,0.00010302563,0.000036091526,0.00016268996,0.00018816911,0.0000858266,0.00012833883,0.00011292915,3.1512798e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012450648,0.00008656102,0.0012112262,0.0010877707,0.00008873242,5.540724e-7,0.095191516,0.827872,0.00021834174,0.06581647,0.00519522,0.0032191887],"study_design_scores_gemma":[0.0003996242,0.00005898342,0.007813125,0.000026734377,0.000011661667,4.91213e-7,0.4206017,0.5513518,0.0012367837,0.0016560946,0.016662326,0.00018072655],"about_ca_topic_score_codex":0.004106601,"about_ca_topic_score_gemma":0.0001867323,"teacher_disagreement_score":0.32541016,"about_ca_system_score_codex":0.0001444297,"about_ca_system_score_gemma":0.000011613092,"threshold_uncertainty_score":0.62079793},"labels":[],"label_agreement":null},{"id":"W2889254900","doi":"10.1109/ccece.2018.8447624","title":"New Heat Energy Trading Concepts for the Next Generation Smart Grids","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Smart grid; Computer science; Electricity; Electric heating; Electricity generation; Electric power; Grid; Energy (signal processing); Distributed generation; Production (economics); Electric potential energy; Distributed computing; Electrical engineering; Renewable energy; Power (physics); Engineering","score_opus":0.048175508735742126,"score_gpt":0.24660898671587203,"score_spread":0.1984334779801299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889254900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055373474,0.00029783297,0.9670269,0.0005162863,0.0032445828,0.00013064535,9.484746e-7,0.0003340236,0.022911467],"genre_scores_gemma":[0.98233294,0.00006667743,0.006648823,0.00068246137,0.004919267,0.00006925001,0.00001502142,0.00004225087,0.005223317],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993965,0.000008278762,0.00014015402,0.00013857658,0.00009858088,0.00021790496],"domain_scores_gemma":[0.99962324,0.000057272926,0.000007140635,0.00023279307,0.00002299189,0.00005658614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088300505,0.00012041189,0.0000862746,0.00003821647,0.00012202387,0.00008277567,0.00014619398,0.000040057996,0.00044758501],"category_scores_gemma":[0.000007979706,0.00008963233,0.00005176629,0.00010747598,0.000022928103,0.00014874121,0.000021248605,0.000030922663,0.000024588957],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052930454,0.0000049277764,0.00003237376,0.000008908372,0.00011172094,4.704614e-7,0.00018401344,0.09102999,0.019422317,0.047934085,0.8033348,0.037931133],"study_design_scores_gemma":[0.00016820546,0.000028826644,0.00006408301,0.0000025492463,0.000014337799,8.735418e-7,0.000027462249,0.58833987,0.026821585,0.00008589826,0.38435626,0.00009007687],"about_ca_topic_score_codex":0.00023102779,"about_ca_topic_score_gemma":0.00054126396,"teacher_disagreement_score":0.9767956,"about_ca_system_score_codex":0.000057299934,"about_ca_system_score_gemma":0.00000991508,"threshold_uncertainty_score":0.4900742},"labels":[],"label_agreement":null},{"id":"W2889289957","doi":"10.1109/ccece.2018.8447742","title":"Real-World Implementation of Residential Thermostat Control for DR","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Thermostat; Setpoint; Demand response; Peak demand; Smart grid; Electricity; Peaking power plant; Flexibility (engineering); Load shifting; Thermal comfort; Demand reduction; Electricity demand; Load management; Computer science; Energy consumption; Control (management); Automotive engineering; Environmental economics; Engineering; Electrical engineering; Electricity generation; Distributed generation; Power (physics); Renewable energy; Economics; Meteorology","score_opus":0.011531292967289197,"score_gpt":0.27856839630549346,"score_spread":0.26703710333820424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889289957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42506295,0.000021096363,0.46143588,0.0004656095,0.0021491984,0.0010847693,0.000044876488,0.00058561075,0.10915],"genre_scores_gemma":[0.997134,0.000008799293,0.001414887,0.000045401383,0.00030486909,0.00004897554,0.00001111658,0.000021150674,0.0010108233],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995088,0.000007450658,0.0001783744,0.00007973415,0.000085461455,0.0001401843],"domain_scores_gemma":[0.9997415,0.000031741256,0.000023326884,0.00013839407,0.000044251967,0.000020801406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000107557404,0.00006627752,0.00008782721,0.00007780184,0.000023440783,0.0000105686495,0.00007127752,0.0000135375685,0.0005724229],"category_scores_gemma":[0.0000029729035,0.00006316697,0.00003471947,0.00008301074,0.00001835165,0.000065476816,0.00001225058,0.000014148075,0.000015220573],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021818474,0.00004855973,0.013117701,0.00029806548,0.0010250695,0.0000025127329,0.001015188,0.03892296,0.11022085,0.14987351,0.6542821,0.03097534],"study_design_scores_gemma":[0.0069150217,0.00043948958,0.17469607,0.000027309376,0.00021822921,5.7617336e-7,0.00090545294,0.10666761,0.6073635,0.002815334,0.099372596,0.00057878863],"about_ca_topic_score_codex":0.00056601485,"about_ca_topic_score_gemma":0.0051051592,"teacher_disagreement_score":0.572071,"about_ca_system_score_codex":0.000035209614,"about_ca_system_score_gemma":0.0000057725283,"threshold_uncertainty_score":0.626763},"labels":[],"label_agreement":null},{"id":"W2889311066","doi":"10.1109/ccece.2018.8447645","title":"Simscape Power Systems Benchmarks for Education and Research in Power Grid Dynamics and Control","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Phasor; MATLAB; Correctness; Electric power system; Computer science; Power (physics); Grid; Control engineering; Engineering; Operating system","score_opus":0.009219194883403586,"score_gpt":0.2669832487290078,"score_spread":0.2577640538456042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889311066","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8515834,0.0009838517,0.019929014,0.0005086881,0.0034387822,0.00117414,0.0000124049475,0.00011782415,0.122251906],"genre_scores_gemma":[0.9988463,0.000029688765,0.0002758938,0.000038103986,0.0001329938,0.00011860142,0.000013817541,0.000019816902,0.00052476214],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993231,0.00001959847,0.00014055762,0.00016524951,0.00011409798,0.0002373598],"domain_scores_gemma":[0.9995793,0.00011380875,0.0000090337035,0.00015817503,0.00008225701,0.00005739839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048229992,0.00008597571,0.000107078005,0.0002052357,0.00004395708,0.000080873906,0.00006291492,0.0000591785,0.000048914306],"category_scores_gemma":[0.000026733016,0.000081758895,0.000009523687,0.00013259063,0.000049194263,0.00012179453,0.00003334948,0.000076135795,0.0000047561275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027822563,0.00049054826,0.05973965,0.0016192765,0.00048282504,0.000010049101,0.0027239155,0.045285992,0.002005897,0.5385073,0.33369148,0.015164872],"study_design_scores_gemma":[0.0010793594,0.00022224899,0.02278281,0.000087361426,0.00001059776,0.000005683231,0.0023659128,0.93421394,0.000092145725,0.00056153827,0.038304742,0.0002736926],"about_ca_topic_score_codex":0.00011532937,"about_ca_topic_score_gemma":0.0002913589,"teacher_disagreement_score":0.88892794,"about_ca_system_score_codex":0.00010690716,"about_ca_system_score_gemma":0.000014437417,"threshold_uncertainty_score":0.3334031},"labels":[],"label_agreement":null},{"id":"W2889336506","doi":"10.1109/ccece.2018.8447603","title":"Mitigating the Impact of Plug-In Electric Vehicles on Distribution Systems Using Demand-Side Management of Electric Water Heaters","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Setpoint; Thermostat; Automotive engineering; Plug-in; Peak demand; Demand side; Environmental science; Computer science; Engineering; Simulation; Environmental economics; Electrical engineering; Electricity","score_opus":0.009934385896661953,"score_gpt":0.22610218121875597,"score_spread":0.21616779532209401,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889336506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988785,0.00010069012,0.0086270245,0.000010995445,0.00013237292,0.00026728827,0.000002163382,0.000067738554,0.0020067177],"genre_scores_gemma":[0.9997493,0.0000322958,0.00007467579,0.0000043822192,0.00006293127,0.000016256274,0.000009627173,0.000023424407,0.000027125505],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988151,0.000051771414,0.0003863716,0.00015342058,0.0002070457,0.00038628624],"domain_scores_gemma":[0.9995945,0.000033256205,0.00004804507,0.00026021074,0.000034339464,0.00002962342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036061942,0.0001669699,0.00020844403,0.0001754216,0.000046660618,0.000021290449,0.00015994295,0.000042053503,0.00000934522],"category_scores_gemma":[0.000004085323,0.000101487116,0.00008096343,0.0005158677,0.000023269835,0.00007131454,0.000039927567,0.000078241515,0.000007022054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020683727,0.000028643077,0.0030590123,0.00015787728,0.00022559382,0.0000039341567,0.00006824109,0.91601926,0.078820646,0.0008141402,0.00021363104,0.0005683495],"study_design_scores_gemma":[0.00028506754,0.00012887394,0.033043288,0.00014976716,0.000036421578,0.0000026387677,0.00006051315,0.6340046,0.33209768,0.000041267736,0.000019066722,0.00013083984],"about_ca_topic_score_codex":0.0007470672,"about_ca_topic_score_gemma":0.000007299313,"teacher_disagreement_score":0.28201467,"about_ca_system_score_codex":0.0003782176,"about_ca_system_score_gemma":0.0000054970487,"threshold_uncertainty_score":0.41385245},"labels":[],"label_agreement":null},{"id":"W2889402862","doi":"10.1109/ccece.2018.8447822","title":"Power Appliance Disaggregation Framework Via Hybrid Hidden Markov Model","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Hidden Markov model; Computer science; Energy consumption; Identification (biology); Consumption (sociology); Pareto principle; Power consumption; Markov chain; Internet of Things; Markov model; Machine learning; Power (physics); Distributed computing; Artificial intelligence; Computer security; Engineering","score_opus":0.006140883603115225,"score_gpt":0.2058305685494297,"score_spread":0.19968968494631445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889402862","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02598256,0.000038093734,0.82417864,0.0001403844,0.00057006784,0.00010088128,0.0000016796679,0.00058087637,0.14840683],"genre_scores_gemma":[0.930278,0.000015205175,0.06681303,0.00030933332,0.00027393887,0.00003643394,0.000005745887,0.000043813987,0.002224519],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992443,0.000005425562,0.0001465475,0.00018913318,0.0001678822,0.00024675173],"domain_scores_gemma":[0.9994907,0.000017328115,0.000016286482,0.00038886484,0.000025593245,0.00006122181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006781107,0.00014397115,0.00010024652,0.00004898864,0.000052181065,0.000033514632,0.00017576227,0.000049693386,0.000705287],"category_scores_gemma":[0.000009483525,0.00014320227,0.000034870787,0.00013005942,0.000036646506,0.0001468747,0.00005904643,0.00009330354,0.0007113128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003735665,0.0000825541,0.0009814936,0.000104434606,0.00025218903,0.000015100339,0.00038783546,0.5737447,0.0018875361,0.048551016,0.28720087,0.08675491],"study_design_scores_gemma":[0.00009579271,0.000014817413,0.0005260252,0.000022906115,0.000007574408,0.0000014682528,0.000010359421,0.97282284,0.0047207307,0.0070524313,0.014492186,0.00023284374],"about_ca_topic_score_codex":0.0000068017607,"about_ca_topic_score_gemma":0.00000533265,"teacher_disagreement_score":0.90429544,"about_ca_system_score_codex":0.00007225694,"about_ca_system_score_gemma":0.0000035432206,"threshold_uncertainty_score":0.9142724},"labels":[],"label_agreement":null},{"id":"W2889843557","doi":"10.1109/comapp.2018.8460222","title":"Integrating Small Scale Green Energy into Smart Grids: Prediction for Peak Load Reduction","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Smart grid; Photovoltaic system; Schedule; Grid; Autoregressive integrated moving average; Computer science; Energy consumption; Autoregressive model; Simulation; Reduction (mathematics); Automotive engineering; Real-time computing; Environmental science; Time series; Electrical engineering; Engineering; Mathematics; Statistics","score_opus":0.009010368531865693,"score_gpt":0.19524249894897158,"score_spread":0.1862321304171059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889843557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08333637,0.00008889728,0.85106933,0.00034262292,0.0050915563,0.0002807008,0.000006414772,0.0017429242,0.05804116],"genre_scores_gemma":[0.94192,0.000051781328,0.042085607,0.00016450405,0.005374859,0.0003580272,0.00009784838,0.00012004718,0.009827348],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990096,0.000015400441,0.00027564436,0.0002698513,0.00015443235,0.0002750394],"domain_scores_gemma":[0.99945307,0.000018687842,0.000030195932,0.0002847735,0.00014084038,0.00007241051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020946932,0.00018417311,0.00013680938,0.00012253622,0.00012765898,0.00004484258,0.00014794806,0.000090390444,0.00008054542],"category_scores_gemma":[0.000021532036,0.0001788697,0.000070050424,0.00020098138,0.000048266138,0.00019872337,0.000054491276,0.00007102984,0.000032771717],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018517887,0.00017112152,0.0010319179,0.00052259926,0.0006476465,0.000002934235,0.003850052,0.073340245,0.093648195,0.024838066,0.34024224,0.4615198],"study_design_scores_gemma":[0.00066631206,0.0003136986,0.0012036046,0.00007322632,0.00006614071,0.00001109429,0.00057032506,0.5229639,0.07220495,0.0017858215,0.39970887,0.00043205783],"about_ca_topic_score_codex":0.0020896932,"about_ca_topic_score_gemma":0.0044813417,"teacher_disagreement_score":0.8585836,"about_ca_system_score_codex":0.00030362196,"about_ca_system_score_gemma":0.0000155026,"threshold_uncertainty_score":0.72940946},"labels":[],"label_agreement":null},{"id":"W2890286150","doi":"10.1016/j.esr.2018.08.010","title":"Valuing infrastructure investments to reduce curtailment","year":2018,"lang":"en","type":"article","venue":"Energy Strategy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; British Columbia Institute of Technology","funders":"British Columbia Institute of Technology; Pacific Institute for Climate Solutions","keywords":"Dispatchable generation; CVAR; Environmental economics; Renewable energy; Reliability engineering; Business; Engineering; Economics; Expected shortfall; Portfolio; Finance; Distributed generation","score_opus":0.023170467912885316,"score_gpt":0.26177455469301053,"score_spread":0.2386040867801252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2890286150","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23952508,0.033499695,0.05613236,0.00057957676,0.012523455,0.0019211967,0.000018166085,0.002448198,0.65335226],"genre_scores_gemma":[0.9648264,0.008273384,0.01310686,0.0035350134,0.0034361274,0.000614884,0.000064741915,0.00021341965,0.0059291683],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984073,0.00007092454,0.0004874038,0.00035810636,0.00021675449,0.00045949648],"domain_scores_gemma":[0.999057,0.000009571449,0.00005583384,0.00060489256,0.00003838348,0.00023431228],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022619848,0.00034058167,0.00036660957,0.00013565854,0.00008482969,0.00007132559,0.00036239464,0.00007970818,0.00043658057],"category_scores_gemma":[0.000021985334,0.00030604034,0.00009072138,0.00047737212,0.000040671544,0.00015822334,0.000100373916,0.00011282787,0.0004828988],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009673329,0.00003365341,0.00017660468,0.00015339944,0.00018828524,0.000015113502,0.00027623805,0.22687712,0.009912738,0.026925538,0.4714815,0.26395014],"study_design_scores_gemma":[0.00014648907,0.0000756959,0.0014833072,0.00011147328,0.000025764171,0.0000038398116,0.000019592246,0.003190375,0.00727243,0.0004971537,0.9868359,0.00033799684],"about_ca_topic_score_codex":0.000035282916,"about_ca_topic_score_gemma":0.000040737275,"teacher_disagreement_score":0.7253013,"about_ca_system_score_codex":0.00016676285,"about_ca_system_score_gemma":0.000018193521,"threshold_uncertainty_score":0.99993914},"labels":[],"label_agreement":null},{"id":"W2891461321","doi":"10.1016/j.dib.2019.103744","title":"HUE: The hourly usage of energy dataset for buildings in British Columbia","year":2019,"lang":"en","type":"article","venue":"Data in Brief","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Hue; Microgrid; Computer science; Consumption (sociology); Grid; Database; Meteorology; Geography; Artificial intelligence","score_opus":0.012763119394168717,"score_gpt":0.21549747800071492,"score_spread":0.2027343586065462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2891461321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95483017,0.00036070048,0.0035003175,0.00012231871,0.0009165175,0.0005603481,0.03855892,0.000076933116,0.0010737872],"genre_scores_gemma":[0.96620995,0.00023183497,0.001514398,0.00039609603,0.000115788134,0.00008253688,0.031105353,0.000055562377,0.00028845805],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991471,0.00001717621,0.00024522174,0.0002419196,0.00012619622,0.00022236917],"domain_scores_gemma":[0.99878407,0.00009712138,0.000030193767,0.0010596476,0.00000802422,0.000020960124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003860953,0.00006912566,0.00016190503,0.000042254447,0.000014577218,0.00010115523,0.0008954228,0.000042109863,0.00011017757],"category_scores_gemma":[0.00005026753,0.00009994451,0.000014346165,0.0002174832,0.000026061058,0.0002814669,0.00036730664,0.00007606558,0.000005138613],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041474614,0.000035066347,0.026242182,0.00010475242,0.00002891536,0.000011357068,0.000020747913,0.019241689,0.00016617645,0.0002483334,0.9473282,0.006568441],"study_design_scores_gemma":[0.00059947267,0.000015794893,0.07919805,0.00006662051,0.0000076153315,0.000002949228,0.000026208221,0.024752412,0.00006493854,0.000076078795,0.8950512,0.0001386824],"about_ca_topic_score_codex":0.05659436,"about_ca_topic_score_gemma":0.2690342,"teacher_disagreement_score":0.21243984,"about_ca_system_score_codex":0.000035380395,"about_ca_system_score_gemma":0.000008371577,"threshold_uncertainty_score":0.94968784},"labels":[],"label_agreement":null},{"id":"W2895555982","doi":"","title":"Multistage Expansion Planning of Active Distribution Systems: Towards Network Integration of Distributed Energy Resources","year":2018,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Saskatchewan","keywords":"Distributed generation; Computer science; Energy (signal processing); Distribution (mathematics); Distributed computing; Engineering; Electrical engineering; Mathematics; Renewable energy; Statistics","score_opus":0.010035771481950942,"score_gpt":0.2302453160969008,"score_spread":0.22020954461494985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895555982","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4852974,0.0012717288,0.49389347,0.000003093592,0.004695177,0.00043269686,0.0010011144,0.00049674767,0.012908549],"genre_scores_gemma":[0.9679183,0.00011344791,0.00040359527,0.0000014179843,0.000406035,0.00007584493,0.02999852,0.00006279732,0.0010200522],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998223,0.00006200214,0.00074511446,0.00028529757,0.00041000787,0.00027455867],"domain_scores_gemma":[0.9988655,0.00005529968,0.00038736552,0.0003570726,0.00027950885,0.000055264994],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016906075,0.0003656674,0.0005662705,0.00014604718,0.000056854158,0.000027647991,0.00022398487,0.00036451904,0.00003596843],"category_scores_gemma":[0.000050137318,0.00034999952,0.00012391391,0.000391101,0.00003610486,0.00013363885,0.000034024797,0.00015737538,0.0000018055256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034659702,0.00006378314,0.000048089434,0.0012623481,0.0005574867,0.000005852429,0.001514454,0.94938904,0.0048095267,0.0035058637,0.02385296,0.014643971],"study_design_scores_gemma":[0.0011189766,0.00043305967,0.033212442,0.006095079,0.00055856566,0.0000025692582,0.015044224,0.66986215,0.21126403,0.00014338743,0.06078725,0.0014782455],"about_ca_topic_score_codex":0.0011641822,"about_ca_topic_score_gemma":0.00036582968,"teacher_disagreement_score":0.4934899,"about_ca_system_score_codex":0.00024264085,"about_ca_system_score_gemma":0.000021720307,"threshold_uncertainty_score":0.9998952},"labels":[],"label_agreement":null},{"id":"W2895637174","doi":"10.22215/etd/2015-11041","title":"Fast Demand Control in Smart Grid Communications with User-in-the-Loop (UIL) Method","year":2015,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Dynamic pricing; Smart grid; Incentive; Electricity; Demand response; Consumption (sociology); Electricity price; Environmental economics; Variety (cybernetics); Control (management); Electricity pricing; Computer science; Microeconomics; Electricity market; Economics; Engineering; Electrical engineering","score_opus":0.013923622816645108,"score_gpt":0.26804273489833624,"score_spread":0.25411911208169113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895637174","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07890143,0.0034429594,0.08961488,0.0014703285,0.0031682688,0.0038822584,0.00006775782,0.0010545066,0.8183976],"genre_scores_gemma":[0.92063415,0.0009712696,0.045710847,0.00092434784,0.00047739933,0.0030651896,0.0046053566,0.0004726343,0.023138795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985896,0.0001867186,0.00039332244,0.00023208364,0.00030310662,0.0002952193],"domain_scores_gemma":[0.9984353,0.00021753862,0.000062267856,0.001161383,0.0000698683,0.00005365147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078069494,0.00031391668,0.0003938747,0.000339861,0.000042255928,0.00006683954,0.00085906824,0.00016665967,0.000036978305],"category_scores_gemma":[0.00002083021,0.00024469223,0.000049214257,0.0004565641,0.00001967469,0.00012236372,0.00003212801,0.0004784688,0.000039527113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017457234,0.00030488914,0.008023321,0.00053712615,0.00065673783,0.00006834252,0.0044018445,0.90077484,0.00017357952,0.009679779,0.06630806,0.008896909],"study_design_scores_gemma":[0.008226413,0.00021616419,0.08138725,0.00082164013,0.0006423076,0.000024151312,0.013932408,0.56050193,0.00030293135,0.00074095826,0.33075893,0.002444901],"about_ca_topic_score_codex":0.0007258879,"about_ca_topic_score_gemma":0.06922565,"teacher_disagreement_score":0.84173274,"about_ca_system_score_codex":0.0001569333,"about_ca_system_score_gemma":0.000040615185,"threshold_uncertainty_score":0.997826},"labels":[],"label_agreement":null},{"id":"W2895989523","doi":"10.1109/sege.2018.8499472","title":"Effects of Centralized Battery Storage Placement in Low-Voltage Residential Distribution Networks with High Photovoltaic Penetration","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Photovoltaic system; Voltage; Electrical engineering; Low voltage; Automotive engineering; Energy storage; Battery storage; Battery (electricity); Penetration (warfare); Computer science; Power (physics); Environmental science; Engineering","score_opus":0.0024265476997487813,"score_gpt":0.171401137835301,"score_spread":0.16897459013555222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895989523","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5795027,0.00003180961,0.41935226,0.000004891822,0.00047381636,0.00028516792,0.0000024350777,0.000101632366,0.00024527474],"genre_scores_gemma":[0.99913263,0.000043313623,0.0002507666,0.000023699786,0.0002038872,0.000055881697,0.00012918166,0.00002700152,0.00013365965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895424,0.0000359416,0.00027375243,0.00019665809,0.00023081439,0.00030859147],"domain_scores_gemma":[0.999616,0.00004562658,0.00004685584,0.00020777373,0.00003311508,0.00005057242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013742036,0.00017373255,0.00018814925,0.00009042772,0.000030706473,0.00002848671,0.00010453194,0.000067684254,0.00018633169],"category_scores_gemma":[0.000009024488,0.00016128138,0.000027896393,0.00027906444,0.00005511997,0.00015970964,0.00003627196,0.00008887132,0.000010766398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016287222,0.00007055965,0.0020221563,0.00021663192,0.00006863054,0.000022053599,0.000058697347,0.9678089,0.0230243,0.00032281433,0.006137364,0.00008499593],"study_design_scores_gemma":[0.0036177263,0.00031279016,0.21334878,0.00029526674,0.00006814321,0.0000015103797,0.000039275074,0.4327115,0.3484538,0.000021142927,0.0007131879,0.00041686028],"about_ca_topic_score_codex":0.00023928868,"about_ca_topic_score_gemma":0.00064243225,"teacher_disagreement_score":0.5350974,"about_ca_system_score_codex":0.000207474,"about_ca_system_score_gemma":0.000009428518,"threshold_uncertainty_score":0.65768635},"labels":[],"label_agreement":null},{"id":"W2896682231","doi":"10.11606/t.55.2018.tde-18102018-104924","title":"Soluções de tomadas de decisões inteligentes para infraestruturas residenciais","year":2018,"lang":"pt","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Computer science; Context (archaeology); Home automation; Process (computing); Node (physics); Wireless sensor network; Energy consumption; Service (business); Decision-making; Computer network; Computer security; Engineering; Telecommunications; Business; Operations management","score_opus":0.01699177592424355,"score_gpt":0.2700450799693697,"score_spread":0.25305330404512616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896682231","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8533549,0.0025696144,0.085383646,0.00017694884,0.0052837296,0.000647885,0.000019704905,0.0013146537,0.05124896],"genre_scores_gemma":[0.9029639,0.0034048525,0.036171574,0.00050752977,0.0024846832,0.00037467424,0.00075658644,0.00051725394,0.052818954],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9961369,0.0001104686,0.0009913472,0.00078818924,0.0006205295,0.0013525501],"domain_scores_gemma":[0.99785763,0.00029881962,0.00022697073,0.00097244565,0.0002685851,0.00037554165],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00059962174,0.0009754006,0.00070922176,0.00062161044,0.00026740148,0.00035643394,0.0009842716,0.00075903285,0.0024243048],"category_scores_gemma":[0.00058329524,0.0010513925,0.00035097852,0.0005294647,0.000083615814,0.0003241834,0.00020497295,0.00056742056,0.0013025957],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060720317,0.0004206479,0.04542717,0.003997475,0.00513395,0.0006044496,0.029785734,0.15071762,0.013310952,0.013999613,0.6823545,0.053640686],"study_design_scores_gemma":[0.0015953581,0.00078755047,0.32681572,0.0040201694,0.0018382695,0.00012957379,0.031960446,0.19746327,0.2979748,0.006791023,0.12410334,0.006520483],"about_ca_topic_score_codex":0.0027339754,"about_ca_topic_score_gemma":0.006737877,"teacher_disagreement_score":0.55825114,"about_ca_system_score_codex":0.00093360286,"about_ca_system_score_gemma":0.00030885136,"threshold_uncertainty_score":0.999475},"labels":[],"label_agreement":null},{"id":"W2897090075","doi":"10.1109/sege.2018.8499437","title":"Hybrid Planning Tool for Solar and Battery Systems in Ontario","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Net metering; Photovoltaic system; Renewable energy; Robustness (evolution); Computer science; Electricity; Sizing; Energy storage; Environmental economics; Grid; Variable renewable energy; Distributed generation; Reliability engineering; Engineering; Electrical engineering; Economics","score_opus":0.014522278905997185,"score_gpt":0.1964996390409005,"score_spread":0.18197736013490332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897090075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.920218,0.000067062945,0.06974644,0.000017254975,0.000956328,0.00017204144,9.1345476e-7,0.00013795705,0.008683993],"genre_scores_gemma":[0.99746007,0.0000013108519,0.001029865,0.000056760255,0.00016053258,0.00004651559,0.000004024207,0.000016803926,0.001224114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957013,0.0000034876764,0.00011509068,0.000103082755,0.000045536373,0.00016265365],"domain_scores_gemma":[0.9998378,0.000024079785,0.000006399058,0.00010373965,0.000007793499,0.000020169202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010233552,0.00007490794,0.00008960966,0.000064642736,0.000020755659,0.000038862225,0.000047015626,0.000018074505,0.000029560468],"category_scores_gemma":[0.0000040200366,0.000074108306,0.000010630378,0.000020350291,0.000008942476,0.00008429315,0.000025583211,0.00004275074,0.000012709634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035342477,0.000025604662,0.16283166,0.00039735745,0.00018096379,0.000045906752,0.0012338465,0.6976374,0.0011373332,0.0026002796,0.13180105,0.0020732344],"study_design_scores_gemma":[0.000954324,0.00009946489,0.114274785,0.00014052587,0.000017742186,0.000013021343,0.00013189393,0.54195887,0.0024682726,0.00010623121,0.339385,0.0004498834],"about_ca_topic_score_codex":0.004074246,"about_ca_topic_score_gemma":0.0076994537,"teacher_disagreement_score":0.20758395,"about_ca_system_score_codex":0.00009222135,"about_ca_system_score_gemma":0.000004898699,"threshold_uncertainty_score":0.6159069},"labels":[],"label_agreement":null},{"id":"W2897163398","doi":"10.1109/sest.2018.8495749","title":"Using a Cluster-Based Method for Controlling the Aggregated Power Consumption of Air Conditioners in a Demand-Side Management Program","year":2018,"lang":"en","type":"article","venue":"2018 International Conference on Smart Energy Systems and Technologies (SEST)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Thermostat; Air conditioning; Intermittency; Computer science; Cluster analysis; Automotive engineering; Electric power system; Power consumption; Controller (irrigation); Power (physics); Set (abstract data type); Simulation; Environmental science; Engineering; Electrical engineering; Mechanical engineering; Meteorology","score_opus":0.03947659005157897,"score_gpt":0.30248212655312046,"score_spread":0.26300553650154146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897163398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14181446,0.00039839596,0.84445095,0.0008225295,0.0023362187,0.0016054505,0.000062108455,0.0011552885,0.0073546027],"genre_scores_gemma":[0.99069214,0.0001074828,0.008535915,0.00005959606,0.00004048517,0.0004416671,0.000027804423,0.00002371762,0.000071206116],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876493,0.00005181686,0.00043216304,0.0002823231,0.00022611403,0.0002426741],"domain_scores_gemma":[0.9992126,0.0001280691,0.00016592692,0.0002829105,0.00018783253,0.000022662336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003683911,0.00021495274,0.0002706687,0.00041682174,0.00007844044,0.00006847437,0.00031399212,0.000119348886,0.000008306082],"category_scores_gemma":[0.000044492896,0.00017059088,0.000051539653,0.0001827935,0.0002169097,0.00009671347,0.000082816376,0.000093264505,0.0000020615728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026684106,0.00015321441,0.0014790917,0.00027439903,0.0007264875,0.000012836494,0.00008115063,0.46621916,0.0017615113,0.5152362,0.0008854536,0.012903669],"study_design_scores_gemma":[0.0013284803,0.00017848433,0.000410593,0.00045525283,0.00003441453,0.000006685993,0.0005018671,0.9826081,0.0026693563,0.0010292722,0.010576448,0.00020106995],"about_ca_topic_score_codex":0.00027353715,"about_ca_topic_score_gemma":0.00021057624,"teacher_disagreement_score":0.84887767,"about_ca_system_score_codex":0.00013291216,"about_ca_system_score_gemma":0.000017570455,"threshold_uncertainty_score":0.69564945},"labels":[],"label_agreement":null},{"id":"W2897193993","doi":"10.2991/iceml-18.2018.47","title":"The Future of Sustaining Energy Using Virtual Power Plant: Challenges and Opportunities for More Efficiently Distributed Energy Resources in Indonesia","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Virtual power plant; Distributed generation; Energy (signal processing); Energy resources; Computer science; Power (physics); Environmental economics; Distributed computing; Renewable energy; Electrical engineering; Engineering; Physics; Economics","score_opus":0.021480662018779177,"score_gpt":0.21209335452856148,"score_spread":0.1906126925097823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897193993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9638061,0.008737108,0.02239103,0.0007548464,0.0007518633,0.00012164634,0.000052108393,0.0001872169,0.0031981096],"genre_scores_gemma":[0.9977878,0.0016743053,0.000087594846,0.000048241,0.00024796158,0.000020501413,0.000023449,0.000031317606,0.00007887664],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990872,0.000031006224,0.0002513012,0.00016567373,0.00015163682,0.00031316053],"domain_scores_gemma":[0.9994965,0.00014874023,0.000046787107,0.00020071039,0.00005686417,0.000050400547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020792556,0.00017241182,0.00018741636,0.00015398425,0.000111828274,0.00003176858,0.00016302458,0.000083050414,0.0000037737827],"category_scores_gemma":[0.000008510744,0.00013207173,0.000031966207,0.000100849655,0.00015742732,0.00007647428,0.000100058416,0.000046520134,4.365266e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003077151,0.00007113,0.00030632594,0.00015705936,0.00033658036,0.000039847193,0.0066649457,0.13126643,0.000464055,0.7766681,0.0026659335,0.0810519],"study_design_scores_gemma":[0.0012617724,0.00033280905,0.004684884,0.0001233685,0.00004112706,0.0000140189395,0.08177169,0.38404694,0.0025580144,0.0002483335,0.5243481,0.00056897453],"about_ca_topic_score_codex":0.000044534874,"about_ca_topic_score_gemma":0.0004402415,"teacher_disagreement_score":0.77641976,"about_ca_system_score_codex":0.000045390967,"about_ca_system_score_gemma":0.000011957513,"threshold_uncertainty_score":0.5385729},"labels":[],"label_agreement":null},{"id":"W2897206375","doi":"10.3390/en11102801","title":"A Compendium of Performance Metrics, Pricing Schemes, Optimization Objectives, and Solution Methodologies of Demand Side Management for the Smart Grid","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Smart grid; Computer science; Demand response; Compendium; Renewable energy; Grid; Electric power system; Key (lock); Distributed generation; Operations research; Risk analysis (engineering); Electricity; Power (physics); Engineering; Business; Computer security","score_opus":0.023792829445537775,"score_gpt":0.24602890781100728,"score_spread":0.2222360783654695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897206375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09697131,0.0020482303,0.89740604,0.00003549771,0.00070170214,0.00028324607,0.000004583788,0.00010959719,0.0024397944],"genre_scores_gemma":[0.8159792,0.0019022463,0.1818676,0.0000075769854,0.00009261278,0.000049444796,0.000007205535,0.000016800688,0.00007732406],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993137,0.00003105181,0.00023326864,0.00013262343,0.00012987574,0.00015949064],"domain_scores_gemma":[0.9993618,0.0002680058,0.000080496255,0.00020186807,0.000074373835,0.000013448071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050153054,0.00011726666,0.00017991777,0.00019685864,0.0000925688,0.000014075038,0.0001370362,0.000034144978,0.0000042160605],"category_scores_gemma":[0.00006961341,0.00009299381,0.00003432359,0.00028255009,0.00013249893,0.0001333474,0.00012529126,0.00003654737,2.9747318e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023155493,0.000006744786,0.000360588,0.00028712046,0.0001882448,1.1051267e-7,0.00016267788,0.98673165,0.0005896127,0.0039490703,0.0003605657,0.007340442],"study_design_scores_gemma":[0.0004081156,0.00011155739,0.010208728,0.000064327025,0.0001283681,9.63074e-7,0.00048777417,0.8569469,0.120544314,0.000093079674,0.010858018,0.00014785801],"about_ca_topic_score_codex":0.00002585365,"about_ca_topic_score_gemma":0.000012752542,"teacher_disagreement_score":0.71900785,"about_ca_system_score_codex":0.000037112146,"about_ca_system_score_gemma":0.000004412407,"threshold_uncertainty_score":0.37921774},"labels":[],"label_agreement":null},{"id":"W2897281315","doi":"10.1109/sege.2018.8499491","title":"A Mathematical Model for the Aggregated Power Consumptions of Air Conditioners","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Thermostat; Air conditioning; Computer science; Thermal comfort; Intermittency; Automotive engineering; Renewable energy; Grid; Conditioners; Simulation; Environmental science; Engineering; Electrical engineering; Meteorology; Mathematics; Mechanical engineering; Environmental engineering","score_opus":0.01938880339180429,"score_gpt":0.24028502184587366,"score_spread":0.22089621845406937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897281315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02194176,0.000016992675,0.9512117,0.00025097726,0.00012910935,0.00020225768,0.000013354343,0.0001899046,0.026043948],"genre_scores_gemma":[0.99184674,0.0000048765155,0.0065673934,0.00010646532,0.000024596555,0.000044631903,0.0000045053503,0.000014822361,0.0013859402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996421,0.0000027959443,0.00012483183,0.000056734003,0.000067767876,0.00010577801],"domain_scores_gemma":[0.99964756,0.00008484418,0.000012706057,0.00018639944,0.000046746143,0.00002175226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006774778,0.00006019026,0.00007088522,0.000032990705,0.000040011786,0.0000050684644,0.0000875587,0.000023883516,0.00040589256],"category_scores_gemma":[0.000019796262,0.000041378757,0.000038818216,0.00006110577,0.000102343794,0.000035532677,0.000017625029,0.000023657487,0.000064837535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004463838,0.000020526511,0.0000065436393,0.00003410662,0.00013620053,1.3918554e-7,0.00021202983,0.7299002,0.0006137588,0.21003063,0.05896668,0.00007472386],"study_design_scores_gemma":[0.00018783455,0.000011898793,0.00008303458,0.000009352854,0.000025772464,7.8943543e-7,0.00006294275,0.9920642,0.0020257118,0.0035463488,0.0019266753,0.000055465545],"about_ca_topic_score_codex":0.0000015493337,"about_ca_topic_score_gemma":0.000007056986,"teacher_disagreement_score":0.969905,"about_ca_system_score_codex":0.000015081254,"about_ca_system_score_gemma":0.000004843477,"threshold_uncertainty_score":0.44442388},"labels":[],"label_agreement":null},{"id":"W2897437642","doi":"10.3390/en11102683","title":"Schedule-Based Operation Method Using Market Data for an Energy Storage System of a Customer in the Ontario Electricity Market","year":2018,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Chosun University","keywords":"Electricity market; Schedule; Electricity; Computer science; Energy storage; Electricity retailing; Environmental economics; Order (exchange); Operations research; Electric power system; Reliability engineering; Business; Power (physics); Economics; Electrical engineering; Engineering; Finance","score_opus":0.038120063518389084,"score_gpt":0.27459596294455274,"score_spread":0.23647589942616365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897437642","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37842202,0.000132387,0.6073371,0.000028525954,0.0007717749,0.00031630468,0.000043922217,0.00019848578,0.01274945],"genre_scores_gemma":[0.9456297,0.0000030977417,0.05363162,0.000056189143,0.0003061291,0.00006756141,0.0000803576,0.000037852802,0.0001874727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871135,0.00023771814,0.00029514398,0.0002770669,0.00021641159,0.00026229347],"domain_scores_gemma":[0.9987999,0.00015781315,0.000056811023,0.00090146303,0.000055492732,0.000028483917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001343802,0.00017853758,0.00022825437,0.00021947462,0.00008124945,0.00006057077,0.00059571216,0.000072238414,0.000059313104],"category_scores_gemma":[0.000033186203,0.00014916227,0.00003704802,0.00030405066,0.000032281663,0.00032387083,0.000077415505,0.000077712466,6.9106204e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008548957,0.000041298765,0.00016589944,0.000111703586,0.00006431455,0.000002407343,0.0002507882,0.98342365,0.0032127057,0.002568166,0.00913883,0.00093476474],"study_design_scores_gemma":[0.0003968708,0.00005754716,0.000962215,0.000038790906,0.000045801622,0.000002120508,0.00020037233,0.94196737,0.011241031,0.000009618866,0.04490868,0.00016958168],"about_ca_topic_score_codex":0.010435514,"about_ca_topic_score_gemma":0.036822747,"teacher_disagreement_score":0.5672077,"about_ca_system_score_codex":0.00030480672,"about_ca_system_score_gemma":0.00006998644,"threshold_uncertainty_score":0.99615407},"labels":[],"label_agreement":null},{"id":"W2898893905","doi":"10.23919/ipec.2018.8507562","title":"A Dynamic Battery Charging Approach for Energy Trading in the Smart Grid","year":2018,"lang":"en","type":"article","venue":"2018 International Power Electronics Conference (IPEC-Niigata 2018 -ECCE Asia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Battery (electricity); Profitability index; Computer science; Profit (economics); Grid; Dynamic pricing; Trading strategy; Energy market; Energy storage; Business; Renewable energy; Electrical engineering; Microeconomics; Engineering; Economics; Finance; Power (physics)","score_opus":0.015580963494535404,"score_gpt":0.23405983942005976,"score_spread":0.21847887592552434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898893905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03650555,0.0006412086,0.83663625,0.003276578,0.0064762663,0.0009320418,0.00014642157,0.00051744847,0.11486824],"genre_scores_gemma":[0.99389005,0.00020532576,0.0027705443,0.0006585437,0.0007845514,0.0003766124,0.00044981716,0.00010757974,0.0007569532],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99696255,0.0000758355,0.000595241,0.00070360344,0.00062879897,0.0010339583],"domain_scores_gemma":[0.99868417,0.0001425917,0.00014212285,0.00075189717,0.00017479606,0.000104397295],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00071870594,0.00048815698,0.00036061043,0.00042734528,0.00017783507,0.00033663938,0.0017767574,0.00017627484,0.00030906717],"category_scores_gemma":[0.00006211703,0.00046028194,0.00016469511,0.00035156845,0.00018327263,0.00059362524,0.00015977042,0.00043646674,0.00006791563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048775127,0.0010075631,0.001778215,0.00028918503,0.0023120742,0.000052707557,0.005440471,0.020762507,0.020085393,0.6083706,0.32210004,0.01731349],"study_design_scores_gemma":[0.0009813383,0.0002378322,0.0014612797,0.00008411949,0.00004475485,0.000045892128,0.00043673906,0.802909,0.0022557087,0.0035897659,0.18723658,0.00071697094],"about_ca_topic_score_codex":0.00007359821,"about_ca_topic_score_gemma":0.00046366427,"teacher_disagreement_score":0.9573845,"about_ca_system_score_codex":0.0006575676,"about_ca_system_score_gemma":0.00012156096,"threshold_uncertainty_score":0.9997849},"labels":[],"label_agreement":null},{"id":"W2899678466","doi":"10.1049/iet-its.2018.5180","title":"Optimising total entry delay at roundabouts with unbalanced flow: a dynamic strategy for smart metering","year":2018,"lang":"en","type":"article","venue":"IET Intelligent Transport Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metering mode; Automotive engineering; Computer science; Flow (mathematics); Transport engineering; Engineering; Mathematics; Mechanical engineering","score_opus":0.016067898277469288,"score_gpt":0.22606236522247738,"score_spread":0.2099944669450081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899678466","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38109306,0.00042505356,0.61163807,0.000007846413,0.0025477856,0.0007768944,0.000056873363,0.00058511697,0.0028692828],"genre_scores_gemma":[0.9944445,0.00006824779,0.002498374,0.000014487231,0.00037290022,0.00028137816,0.00017779719,0.00015566716,0.0019866598],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977069,0.000020502162,0.0006450242,0.0004997495,0.00039423478,0.00073359464],"domain_scores_gemma":[0.9990862,0.000042864474,0.00007604608,0.0004854658,0.00012308774,0.00018633413],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027457954,0.00045883618,0.00047930813,0.00017343473,0.00017028183,0.000109618464,0.0002720897,0.00014183568,0.000084550804],"category_scores_gemma":[0.000002814466,0.00042484916,0.00015401877,0.00025195425,0.00006355339,0.00021816957,0.000019473831,0.00013436197,0.000065433145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015103308,0.00003116431,0.0007957489,0.00050138094,0.0004676312,0.000046434994,0.0004985435,0.9946132,0.0016090841,0.00020063805,0.0002431273,0.0008420566],"study_design_scores_gemma":[0.0007960918,0.0004435637,0.0008749048,0.0005354034,0.0001848292,0.00013187034,0.0004169288,0.9580375,0.0067527015,0.000008566772,0.030971905,0.00084574847],"about_ca_topic_score_codex":0.00012800017,"about_ca_topic_score_gemma":0.0007139683,"teacher_disagreement_score":0.61335146,"about_ca_system_score_codex":0.0005082186,"about_ca_system_score_gemma":0.000034078592,"threshold_uncertainty_score":0.99982035},"labels":[],"label_agreement":null},{"id":"W2900330031","doi":"10.1007/s12667-018-0312-x","title":"Co-optimization of demand response and interruptible load reserve offers for a price-making major consumer","year":2018,"lang":"en","type":"article","venue":"Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Flexibility (engineering); Electricity; Demand response; Intuition; Electricity market; Computer science; Consumption (sociology); Robust optimization; Microeconomics; Optimization problem; Mathematical optimization; Economics; Operations research; Engineering; Mathematics","score_opus":0.014864822966367451,"score_gpt":0.24663680992853032,"score_spread":0.23177198696216286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900330031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2448966,0.001729554,0.7414074,0.000046983794,0.0019461787,0.00044833592,0.00002763125,0.0003168351,0.009180485],"genre_scores_gemma":[0.99719465,0.00002750632,0.0015562519,0.000018969493,0.00017934297,0.000093153765,0.000009223806,0.000045932247,0.00087496004],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990127,0.000084565996,0.000321221,0.00019234154,0.00016838187,0.00022078457],"domain_scores_gemma":[0.99932367,0.00016088455,0.00008272401,0.0002655006,0.00011686893,0.00005035006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055830413,0.00014749197,0.00022753754,0.00017299145,0.000058522397,0.000042694952,0.00011829134,0.00008036197,0.000018428798],"category_scores_gemma":[0.00009391117,0.00014779634,0.000036516885,0.00014886062,0.00006670734,0.0001120787,0.00003202674,0.00003293025,0.0000026927582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045756242,0.000013941027,0.0004952147,0.0003384642,0.0002452735,0.0000034137308,0.0004565353,0.98452437,0.0048547722,0.001177556,0.0073229396,0.00010994027],"study_design_scores_gemma":[0.00092247815,0.00018874931,0.0002615866,0.00027159773,0.00004117246,0.000011097002,0.00021262365,0.92631656,0.009601495,0.000013403461,0.061917897,0.00024132091],"about_ca_topic_score_codex":0.00012232023,"about_ca_topic_score_gemma":0.00005652672,"teacher_disagreement_score":0.75229806,"about_ca_system_score_codex":0.00011488768,"about_ca_system_score_gemma":0.000020412695,"threshold_uncertainty_score":0.60269594},"labels":[],"label_agreement":null},{"id":"W2901173008","doi":"10.5539/ijef.v10n12p127","title":"“Take Photos to Make Money” APP’s Task Pricing","year":2018,"lang":"en","type":"article","venue":"International Journal of Economics and Finance","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Task (project management); Crowdsourcing; Computer science; Scheme (mathematics); CONTEST; Cluster analysis; The Internet; Pricing strategies; Service (business); Variety (cybernetics); Marketing; Economics; Artificial intelligence; Business; World Wide Web; Management; Mathematics","score_opus":0.0074793789790916195,"score_gpt":0.19475689621539133,"score_spread":0.1872775172362997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901173008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9878727,0.00013442035,0.0049820244,0.00046076265,0.0022932058,0.00003163496,0.0000065415684,0.00000810909,0.0042105624],"genre_scores_gemma":[0.994547,0.0012553991,0.0028967124,0.00031171742,0.0008126271,0.0000019052138,6.781672e-7,0.000011998895,0.00016194713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955577,0.0000020705797,0.0002406288,0.00007065759,0.00004370608,0.00008716943],"domain_scores_gemma":[0.9997489,0.00001196757,0.000072842,0.00006345018,0.000071991344,0.00003086167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000099891666,0.00006758602,0.000099943,0.000113498725,0.00001710799,0.000046981462,0.00019305987,0.000019838395,0.000011264637],"category_scores_gemma":[0.000009389399,0.00007134441,0.000030777475,0.000026963527,0.00001615077,0.000103197584,0.000045478624,0.00005633941,0.000016948037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063399675,0.000025522253,0.000665877,0.0000064813767,0.0002514484,0.00003381224,0.00040203304,0.90722543,0.00068723847,0.014789429,0.0066651492,0.069184154],"study_design_scores_gemma":[0.0005118732,0.000101518395,0.010501175,0.000059969607,0.000008894699,0.000082205304,0.000028395421,0.1788593,0.0033053255,0.0014144628,0.80494696,0.00017992307],"about_ca_topic_score_codex":0.000007070752,"about_ca_topic_score_gemma":0.000027056905,"teacher_disagreement_score":0.7982818,"about_ca_system_score_codex":0.00007485325,"about_ca_system_score_gemma":0.000008929783,"threshold_uncertainty_score":0.29093406},"labels":[],"label_agreement":null},{"id":"W2901459783","doi":"10.4095/299224","title":"Data issues and promising practices for integrated community energy mapping","year":2016,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Data science; Computer science; Energy (signal processing); Mathematics; Statistics","score_opus":0.18379186345259738,"score_gpt":0.3489185264256712,"score_spread":0.16512666297307385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901459783","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013540364,0.016668577,0.32476342,0.0008751005,0.0064256056,0.0011320607,0.00091851864,0.0028221428,0.6450406],"genre_scores_gemma":[0.07044522,0.21385802,0.1786437,0.0005549048,0.013855955,0.0014756209,0.022867233,0.0021341625,0.4961652],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99858314,0.000086356304,0.00041933876,0.000328068,0.00028697163,0.00029613168],"domain_scores_gemma":[0.9976138,0.0004013311,0.00028504874,0.0014506555,0.00018293428,0.000066231],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001520344,0.0003493538,0.0004515046,0.00020857393,0.00014750143,0.0001751835,0.000694875,0.00022568295,0.000057549503],"category_scores_gemma":[0.00090542674,0.00027080817,0.000038349644,0.00010296658,0.000041171254,0.00043555084,0.000692035,0.00032370473,0.0000031226627],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011403724,0.00004137108,0.00008879397,0.0025688014,0.0013484228,0.00000955106,0.000104042905,0.0004523474,0.00040920466,0.0004070535,0.793556,0.20100306],"study_design_scores_gemma":[0.00015911389,0.00001683155,0.00005858426,0.0006642447,0.00009438113,0.000013404408,0.00027200748,0.013500292,0.0002240739,0.000098029435,0.98453826,0.0003607897],"about_ca_topic_score_codex":0.0065908497,"about_ca_topic_score_gemma":0.003338511,"teacher_disagreement_score":0.20064226,"about_ca_system_score_codex":0.00020535194,"about_ca_system_score_gemma":0.000107233696,"threshold_uncertainty_score":0.9999744},"labels":[],"label_agreement":null},{"id":"W2904502618","doi":"","title":"CIGRE' Task Force C6.04.02: Developing benchmark models for integrating distributed energy resources","year":2005,"lang":"en","type":"article","venue":"CINECA IRIS Institutial research information system (University of Pisa)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmark (surveying); Task (project management); Task force; Computer science; Energy (signal processing); Energy resources; Environmental science; Engineering; Systems engineering; Physics; Geography; Political science; Cartography","score_opus":0.03328374709269871,"score_gpt":0.24127568752432013,"score_spread":0.20799194043162142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2904502618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020319464,0.000059377857,0.9416445,0.00028315224,0.00027798084,0.00042482678,0.00014203625,0.0002972537,0.036551427],"genre_scores_gemma":[0.9881748,0.000043253385,0.011100527,0.000022007558,0.00018043346,0.000012565348,0.00028715024,0.000015010575,0.00016428537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980534,0.000077285324,0.00047018562,0.0001953647,0.0006658243,0.0005379687],"domain_scores_gemma":[0.998523,0.0001615426,0.00014570689,0.000374875,0.0006315516,0.00016332504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001119521,0.00020571165,0.000319426,0.0007778092,0.00062263303,0.00010789718,0.0006418822,0.00016051467,0.000021137357],"category_scores_gemma":[0.000146941,0.00024253785,0.000114215676,0.00074142846,0.00016427733,0.0025741782,0.00025939333,0.00021947183,0.00003473295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009977787,0.000009876187,0.00002781599,0.00085179036,0.00012802667,0.000004323159,0.002756683,0.8223462,0.00015341704,0.13582605,0.022983514,0.014812497],"study_design_scores_gemma":[0.00079227576,0.00004061452,0.00010188914,0.00027388023,0.000013853455,0.0000038743783,0.008537573,0.7040027,0.00036226335,0.0000614356,0.28560433,0.0002053241],"about_ca_topic_score_codex":0.00053695845,"about_ca_topic_score_gemma":0.00040691963,"teacher_disagreement_score":0.9678553,"about_ca_system_score_codex":0.0011029723,"about_ca_system_score_gemma":0.00014493242,"threshold_uncertainty_score":0.9890406},"labels":[],"label_agreement":null},{"id":"W2905682373","doi":"10.1109/pesgm.2018.8586325","title":"PV-STATCOM – A New Smart Inverter for Voltage Control in Distribution Systems","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Inverter; Voltage; Voltage source inverter; Computer science; Control (management); Control theory (sociology); Control system; Control engineering; Electrical engineering; Engineering","score_opus":0.00877816048496761,"score_gpt":0.19653189467235116,"score_spread":0.18775373418738356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905682373","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010002438,0.000052153686,0.9839855,0.000120108714,0.0014370907,0.0004165824,0.000024974177,0.00027965588,0.0036815316],"genre_scores_gemma":[0.9966687,0.000003889238,0.00019235254,0.00017202893,0.0004143436,0.00010107468,0.00005569788,0.000023778,0.0023681615],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999304,0.000008652371,0.00020094882,0.00013700739,0.00008629483,0.00026307645],"domain_scores_gemma":[0.9996692,0.000035877107,0.000013866795,0.00018987873,0.000025273755,0.00006589146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013192087,0.00011680725,0.00014955642,0.000053306037,0.00002240459,0.000040832976,0.00009753788,0.000050799536,0.0000534621],"category_scores_gemma":[0.000016585596,0.00010996075,0.00003603581,0.00011383969,0.000014661017,0.00010455932,0.000016720576,0.000042156124,0.0000972321],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047793397,0.00003445414,0.009491298,0.00017007158,0.00014389669,0.000005591506,0.00014414743,0.09179475,0.0013953375,0.027189612,0.86707664,0.0025063972],"study_design_scores_gemma":[0.0011281186,0.00003964863,0.003296522,0.000018675335,0.000011153255,6.486882e-7,0.000030175437,0.7014474,0.0002561896,0.000113616166,0.29352468,0.0001331607],"about_ca_topic_score_codex":0.00047444797,"about_ca_topic_score_gemma":0.00053957186,"teacher_disagreement_score":0.98666626,"about_ca_system_score_codex":0.00014315009,"about_ca_system_score_gemma":0.000008990304,"threshold_uncertainty_score":0.4484069},"labels":[],"label_agreement":null},{"id":"W2906506210","doi":"10.1109/tpwrs.2018.2889773","title":"Material Flow Based Power Demand Modeling of an Oil Refinery Process for Optimal Energy Management","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Cogeneration; Refinery; Electricity generation; Electricity; Oil refinery; Energy management; Distributed generation; Demand response; Energy consumption; Process engineering; Engineering; Renewable energy; Waste management; Power (physics); Energy (signal processing)","score_opus":0.011643027165909668,"score_gpt":0.21897857115378505,"score_spread":0.20733554398787538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906506210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050312385,0.00002590651,0.94015557,0.000010266995,0.006013032,0.00018266277,0.000091993,0.00033572275,0.0028724896],"genre_scores_gemma":[0.99604607,0.000008618415,0.0028419744,0.000027953827,0.00009601719,0.00044078485,0.000016415543,0.00009974837,0.0004224351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984831,0.00003505882,0.00047982697,0.00034460885,0.00030062065,0.00035678077],"domain_scores_gemma":[0.99921817,0.000017461261,0.00005188584,0.0004922713,0.000121849036,0.000098351375],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021909583,0.00027963222,0.00030216086,0.00030709943,0.00011119278,0.000059480844,0.00023773538,0.00011655214,0.00007897031],"category_scores_gemma":[7.6423686e-7,0.00028562627,0.00010770426,0.00019887285,0.000034139768,0.0002096235,0.0000015454223,0.00006288888,0.000008823136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018287798,0.000110935376,2.1563244e-7,0.0003806637,0.00018819452,0.0000038609305,0.00012491542,0.99749047,0.00087171595,0.00010623718,0.00021712665,0.00032277024],"study_design_scores_gemma":[0.00078387064,0.00027538286,0.0000011526241,0.00015767495,0.000076507866,0.000003594745,0.00014942215,0.97179574,0.02337055,0.0000044054077,0.0030883534,0.00029335803],"about_ca_topic_score_codex":0.000044464854,"about_ca_topic_score_gemma":0.000028072067,"teacher_disagreement_score":0.94573367,"about_ca_system_score_codex":0.00009320771,"about_ca_system_score_gemma":0.00001453678,"threshold_uncertainty_score":0.9999596},"labels":[],"label_agreement":null},{"id":"W2906561131","doi":"10.1002/9781119360124","title":"Transportation and Power Grid in Smart Cities","year":2018,"lang":"en","type":"book","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Power grid; Grid; Power (physics); Computer science; Business; Transport engineering; Geography; Electrical engineering; Engineering; Physics; Geodesy","score_opus":0.005177087518162306,"score_gpt":0.16591856191880613,"score_spread":0.16074147440064382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906561131","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029078193,0.00023087084,0.000483299,0.000016824471,0.0012212,0.000109048626,0.000014470626,0.00023620503,0.99478024],"genre_scores_gemma":[0.007581326,0.00036692614,0.00042998896,0.000093755094,0.00038915232,0.000029755965,0.00025617567,0.0000890803,0.99076384],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994595,0.0000032250462,0.00016844535,0.0001397939,0.000100689576,0.0001283689],"domain_scores_gemma":[0.9998057,0.000014312951,0.000012424849,0.00013069002,0.000010310604,0.000026559977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000055044715,0.00016599939,0.000158375,0.00016749947,0.000009044484,0.000016340608,0.000057871664,0.0001234903,0.00056509906],"category_scores_gemma":[0.0000012033661,0.00017380538,0.0000248772,0.000029920382,0.000029094881,0.000060340622,0.000005962813,0.00009892964,0.000050370854],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000047080853,0.0000049298733,0.00052641623,0.0002800851,0.00009562914,0.00002742993,0.00038007472,0.006576226,0.0000049836267,0.014645135,0.9770686,0.00038579266],"study_design_scores_gemma":[0.00017087151,0.000021011516,0.0108022755,0.00009026889,0.000018248675,5.4911317e-7,0.000028541059,0.00061397825,0.00003425567,0.0009632764,0.98697287,0.0002838655],"about_ca_topic_score_codex":0.000021345959,"about_ca_topic_score_gemma":0.00097332953,"teacher_disagreement_score":0.013681859,"about_ca_system_score_codex":0.00007964514,"about_ca_system_score_gemma":0.000010234426,"threshold_uncertainty_score":0.70875776},"labels":[],"label_agreement":null},{"id":"W2907141168","doi":"10.1109/smartgridcomm.2018.8587535","title":"An Autonomous Demand Response Algorithm based on Online Convex Optimization","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Demand response; Computer science; Mathematical optimization; Convex optimization; Benchmark (surveying); Scheduling (production processes); Schedule; Load management; Jacobian matrix and determinant; Regular polygon; Electricity; Mathematics; Engineering","score_opus":0.007467318266908811,"score_gpt":0.22212537085609937,"score_spread":0.21465805258919057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907141168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02279076,0.0000050769972,0.97036403,0.00015036819,0.000511067,0.00010301871,0.0000075642242,0.000810499,0.0052576265],"genre_scores_gemma":[0.7237271,0.000004734871,0.27390936,0.00092809746,0.00047472908,0.00001699079,0.000094614414,0.00006405558,0.00078030006],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935144,0.000047670314,0.00013941883,0.0001677085,0.00012082411,0.00017292332],"domain_scores_gemma":[0.9994852,0.00004366957,0.00001300576,0.00034434296,0.00003719209,0.00007662177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020706544,0.00012440099,0.00009549188,0.00013924138,0.00004519482,0.0000326439,0.000114972,0.00005257771,0.0006504534],"category_scores_gemma":[0.000016620252,0.000121464174,0.000020740305,0.00014244739,0.000028262935,0.000094440526,0.000012573221,0.00005042299,0.00007950494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046533423,0.000047924994,0.000021910357,0.0000033714198,0.000011056468,0.0000047679146,0.000021983005,0.99429274,0.00016025457,0.000048383477,0.0019730343,0.0033680215],"study_design_scores_gemma":[0.00037961514,0.00025388534,0.001648322,0.000006751755,0.000008156118,6.4405776e-7,0.00001624206,0.98459274,0.0028124896,0.000004674056,0.010124048,0.00015245556],"about_ca_topic_score_codex":0.0000094586,"about_ca_topic_score_gemma":0.000011297861,"teacher_disagreement_score":0.7009364,"about_ca_system_score_codex":0.00008485277,"about_ca_system_score_gemma":0.00001315966,"threshold_uncertainty_score":0.7122008},"labels":[],"label_agreement":null},{"id":"W2907198993","doi":"10.1109/iecon.2018.8591684","title":"Transient Event Classification Based on Wavelet Neuronal Network and Matched Filters","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Smart grid; Context (archaeology); Transient (computer programming); Event (particle physics); Wavelet; Feature extraction; Energy (signal processing); Wavelet transform; Data mining; Artificial intelligence; Filter (signal processing); Process (computing); Building automation; Energy consumption; Pattern recognition (psychology); Real-time computing; Engineering; Computer vision; Mathematics","score_opus":0.013112600514417715,"score_gpt":0.2014507847402869,"score_spread":0.1883381842258692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907198993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54613465,0.000016882892,0.39003262,0.001980119,0.0018582749,0.00031625136,0.0000037249824,0.0007055655,0.05895191],"genre_scores_gemma":[0.99675596,0.0000069203925,0.002195085,0.0005267896,0.00027207728,0.000020090516,0.000011467913,0.000021500442,0.0001901192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941397,0.000014797473,0.00011796845,0.0001501085,0.00012459632,0.00017855367],"domain_scores_gemma":[0.9997196,0.000024088138,0.000009816073,0.00018181544,0.0000108287695,0.000053847994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008665445,0.000102548096,0.00007297896,0.00004153837,0.00003680213,0.000019524843,0.00005968593,0.000028374547,0.00020281604],"category_scores_gemma":[0.0000024920287,0.000096109085,0.00002260051,0.000092554015,0.000025677231,0.000032086926,0.000008740241,0.000049137576,0.00004703008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002827315,0.000030377307,0.00041182566,0.000029016812,0.00002931139,0.0000019740005,0.0000669174,0.9207557,0.0011501405,0.0022238933,0.067709446,0.007563153],"study_design_scores_gemma":[0.00022859908,0.00007039487,0.0999048,0.0000108938575,0.0000080831815,3.1466638e-7,0.000010763442,0.86822754,0.00076728367,0.000022212436,0.030643212,0.00010592872],"about_ca_topic_score_codex":0.0000038356416,"about_ca_topic_score_gemma":0.000013986994,"teacher_disagreement_score":0.4506213,"about_ca_system_score_codex":0.000037179365,"about_ca_system_score_gemma":0.00000320294,"threshold_uncertainty_score":0.39192146},"labels":[],"label_agreement":null},{"id":"W2909155510","doi":"10.1109/epec.2018.8598367","title":"Design and Field Implementation of a Multi-Agent System for Voltage Regulation Using Smart Inverters and Data Distribution Service (DDS)","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto and Region Conservation Authority; York University","funders":"","keywords":"Smart grid; Microgrid; Scalability; Computer science; Interoperability; Asynchronous communication; Distributed computing; Distributed generation; Renewable energy; Embedded system; Computer network; Electrical engineering; Engineering; Control (management); Database","score_opus":0.06271352084665127,"score_gpt":0.29000893966150293,"score_spread":0.22729541881485166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909155510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14694671,0.00002025381,0.85242003,0.00001980758,0.0001825797,0.0003193301,0.000025586087,0.0000559115,0.000009797086],"genre_scores_gemma":[0.97439146,0.0000055652877,0.025303468,0.000027754084,0.00005143948,0.000013628038,0.0001903431,0.00001099352,0.0000053687713],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951255,0.000014531542,0.00016658907,0.00013163842,0.0000634961,0.000111214795],"domain_scores_gemma":[0.99965614,0.000039169976,0.000034899906,0.00019943241,0.000039841565,0.000030521158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024574302,0.00007624317,0.000082305945,0.000035532954,0.000046334335,0.00002004892,0.00005966567,0.000030237366,0.00000584371],"category_scores_gemma":[0.000007120602,0.00007780429,0.0000062401637,0.000076687225,0.000009354985,0.00024524765,0.000076468394,0.000013993497,4.930836e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004161624,0.00017282882,0.07080565,0.013169992,0.0017673452,0.0000030959463,0.006814552,0.29384527,0.3951509,0.0083632255,0.051288947,0.15820205],"study_design_scores_gemma":[0.00044351054,0.000031204774,0.005709755,0.00003130891,0.000046568257,0.0000013523933,0.0005489666,0.960301,0.03242841,0.000003873972,0.0003754519,0.00007858603],"about_ca_topic_score_codex":0.00036861104,"about_ca_topic_score_gemma":0.00018856101,"teacher_disagreement_score":0.82744473,"about_ca_system_score_codex":0.000058500522,"about_ca_system_score_gemma":0.0000042968904,"threshold_uncertainty_score":0.3172767},"labels":[],"label_agreement":null},{"id":"W2909514544","doi":"10.1109/epec.2018.8598355","title":"A Very Deep One Dimensional Convolutional Neural Network (VDOCNN) for Appliance Power Signature Classification","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Convolutional neural network; Computer science; Signature (topology); Artificial intelligence; Deep learning; Pattern recognition (psychology); Power (physics); Artificial neural network; Mathematics","score_opus":0.015231712713074158,"score_gpt":0.21010280913525853,"score_spread":0.19487109642218436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909514544","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0815109,0.0009459724,0.87245005,0.0012019986,0.0068472736,0.0010426921,0.000021013515,0.0013811946,0.034598902],"genre_scores_gemma":[0.9803061,0.0000046382197,0.016649215,0.00056409306,0.0013990407,0.00013637067,0.000075358614,0.000035613903,0.00082958327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990785,0.000009335647,0.0001756346,0.0002241942,0.00019173973,0.00032057718],"domain_scores_gemma":[0.9995438,0.00006721872,0.000025149726,0.00021195218,0.00008921618,0.000062682106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103474915,0.00014560475,0.000118854565,0.00003881266,0.00010346779,0.000023401795,0.00013101622,0.00009302768,0.0003683155],"category_scores_gemma":[0.000010689665,0.0001481204,0.000055833967,0.00016250552,0.000059870283,0.00011904618,0.000038081434,0.0000989743,0.00013025438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052258096,0.000033308417,0.00021677828,0.000021634964,0.000096673444,6.9928535e-7,0.000016972252,0.7830028,0.0024483907,0.04823919,0.16506709,0.0008042319],"study_design_scores_gemma":[0.0003704354,0.000050880924,0.01689235,0.000012097593,0.000017273618,0.0000014045279,0.000009433313,0.9034442,0.00032778038,0.0009781567,0.07768142,0.00021457995],"about_ca_topic_score_codex":0.0000019670383,"about_ca_topic_score_gemma":0.00002099391,"teacher_disagreement_score":0.8987952,"about_ca_system_score_codex":0.00008755742,"about_ca_system_score_gemma":0.000009403554,"threshold_uncertainty_score":0.60401744},"labels":[],"label_agreement":null},{"id":"W2909575342","doi":"10.1049/iet-rpg.2018.5737","title":"Parallel stochastic programming for energy storage management in smart grid with probabilistic renewable generation and load models","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Renewable energy; Probabilistic logic; Smart grid; Computer science; Grid; Energy storage; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Artificial intelligence","score_opus":0.01425241482644389,"score_gpt":0.19847024113573739,"score_spread":0.1842178263092935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909575342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08558084,0.00062330294,0.90742475,0.00005866663,0.001439267,0.0016751306,0.000009370859,0.00026371528,0.002924944],"genre_scores_gemma":[0.9548336,0.00013080455,0.039096735,0.00009385134,0.00048742918,0.0018435427,0.00039165493,0.00012778163,0.0029945462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99803275,0.00003927204,0.0004163162,0.0006215447,0.00037152655,0.0005186019],"domain_scores_gemma":[0.9992132,0.000024311557,0.00007423429,0.0004557102,0.00013438083,0.00009815791],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000348501,0.00036214065,0.00030666814,0.00023280858,0.00009973368,0.0001955474,0.0001383336,0.00011562689,0.000018886838],"category_scores_gemma":[0.000011813442,0.0003616194,0.00004393532,0.00030504592,0.000026249096,0.0005031565,0.000056905665,0.00007140052,0.0000043880755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004852855,0.000056257715,0.000038112164,0.00011659126,0.000088193694,0.000004043196,0.00017924471,0.99038243,0.002181351,0.0023524573,0.0035322092,0.0010205775],"study_design_scores_gemma":[0.0015308611,0.00020513106,0.000038438026,0.000053491287,0.00005387753,0.0000032639953,0.00006623767,0.9813058,0.0008828445,0.00037702313,0.015023645,0.0004593989],"about_ca_topic_score_codex":0.00064576353,"about_ca_topic_score_gemma":0.0064345812,"teacher_disagreement_score":0.8692528,"about_ca_system_score_codex":0.00036871014,"about_ca_system_score_gemma":0.000045588928,"threshold_uncertainty_score":0.9998836},"labels":[],"label_agreement":null},{"id":"W2909649317","doi":"10.2316/journal.203.2018.2.203-0013","title":"MULTI-OBJECTIVE HYBRID EVOLUTIONARY ALGORITHM-BASED DG AND CAPACITOR PLANNING IN DISTRIBUTION SYSTEM","year":2018,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Capacitor; Evolutionary algorithm; Voltage; Mathematical optimization; Computer science; Power loss; Power (physics); Distributed generation; Algorithm; Engineering; Control theory (sociology); Mathematics; Electrical engineering; Physics; Artificial intelligence; Control (management)","score_opus":0.006402086991393854,"score_gpt":0.21296215297032212,"score_spread":0.20656006597892826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909649317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24007821,0.003033219,0.74287945,0.00005949841,0.012747968,0.00005922387,0.00009316609,0.00008073272,0.0009685468],"genre_scores_gemma":[0.9983661,0.000026955517,0.0006757741,0.000014335259,0.00083981804,0.0000069487646,0.000016888886,0.000015172204,0.000037994014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899846,0.000045608944,0.0003861876,0.00011547196,0.00031362963,0.00014061989],"domain_scores_gemma":[0.9994747,0.0000441458,0.00011079881,0.00006270465,0.00023366485,0.00007396113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023757629,0.00012869998,0.00018121213,0.0002424796,0.00003673749,0.00006807302,0.00013719492,0.000045809218,0.0000029363293],"category_scores_gemma":[0.00001716041,0.00012078519,0.000037588732,0.00006853413,0.00005307214,0.00020302176,0.000030105095,0.00009532601,0.0000012778399],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003342518,0.00022588029,0.026719548,0.00023515498,0.0016512439,0.0014865672,0.0016172692,0.9372386,0.002253737,0.0050586965,0.013717189,0.009461875],"study_design_scores_gemma":[0.0012203429,0.00010850812,0.024363168,0.0005992915,0.000016572358,0.00051246077,0.00070387876,0.9543886,0.0003793795,0.000010847359,0.017512953,0.00018397746],"about_ca_topic_score_codex":0.00020154065,"about_ca_topic_score_gemma":0.000007505935,"teacher_disagreement_score":0.7582879,"about_ca_system_score_codex":0.00038457598,"about_ca_system_score_gemma":0.00001997697,"threshold_uncertainty_score":0.49254772},"labels":[],"label_agreement":null},{"id":"W2910246042","doi":"10.1049/iet-gtd.2018.5649","title":"Transformation of microgrid to virtual power plant – a comprehensive review","year":2019,"lang":"en","type":"review","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Microgrid; Virtual power plant; Renewable energy; Computer science; Distributed generation; Electric power system; AC power; Reliability engineering; Reliability (semiconductor); Grid; Fault (geology); Control engineering; Engineering; Distributed computing; Power (physics); Electrical engineering","score_opus":0.040848585981257006,"score_gpt":0.2790097579232586,"score_spread":0.2381611719420016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910246042","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000009198026,0.8269414,0.1686177,0.00007876649,0.000898684,0.0017006599,0.0014685988,0.0001568381,0.00012818728],"genre_scores_gemma":[0.00011646089,0.9750946,0.00019956529,0.00008636352,0.0001225976,0.00021947343,0.024054108,0.0000652056,0.000041586354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99740285,0.00015337022,0.0012859617,0.0003901542,0.00046000667,0.00030765784],"domain_scores_gemma":[0.99902403,0.000039916962,0.00018939187,0.00043932797,0.0001462068,0.00016110249],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022878783,0.0005506541,0.0013932022,0.00018258426,0.000065737455,0.000036356087,0.00025694398,0.00030087627,0.00019127701],"category_scores_gemma":[0.000008632661,0.00049512327,0.00051992055,0.0005696912,0.000018600082,0.00017915592,0.00001762945,0.0002550678,0.00018078511],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000764899,0.000046163415,3.7799843e-8,0.048282675,0.0001793516,0.0000019762138,0.00007227808,0.012430274,0.00044825353,0.0004566495,0.06258612,0.8754886],"study_design_scores_gemma":[0.00020731035,0.00010295751,0.0000011668137,0.019943722,0.00064156984,0.00001189747,0.000007750409,0.0026970704,0.00058791245,9.3604154e-7,0.975337,0.00046067694],"about_ca_topic_score_codex":0.000003692263,"about_ca_topic_score_gemma":9.023282e-7,"teacher_disagreement_score":0.9127509,"about_ca_system_score_codex":0.0002879325,"about_ca_system_score_gemma":0.00008551847,"threshold_uncertainty_score":0.99975},"labels":[],"label_agreement":null},{"id":"W2910432267","doi":"10.1109/epec.2018.8598288","title":"Increasing Renewable Energy Penetration through Strategic Deployment of IoT Devices","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Software deployment; Renewable energy; Penetration (warfare); Electricity; Fossil fuel; Internet of Things; Computer science; Electricity generation; Environmental economics; Electrical engineering; Computer security; Engineering; Waste management; Operations research; Power (physics)","score_opus":0.022520324305752952,"score_gpt":0.2247431135017036,"score_spread":0.20222278919595063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910432267","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5541625,0.00018963173,0.051682115,0.000026322974,0.00045315307,0.00005772688,8.4479814e-7,0.0003547644,0.3930729],"genre_scores_gemma":[0.9899102,0.000045861823,0.0093253525,0.00008341457,0.00023879,0.000009885981,0.000007086763,0.000026756814,0.0003526882],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99924654,0.000023884882,0.000229883,0.00014178602,0.00016669987,0.00019118923],"domain_scores_gemma":[0.9996378,0.000024922208,0.00003359775,0.0002264377,0.000044395754,0.000032841297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011502727,0.00012455892,0.00012356133,0.000060026887,0.000041317344,0.00002856318,0.00012293349,0.000045460496,0.00031790198],"category_scores_gemma":[0.000003847749,0.00011924378,0.000029006498,0.00019103228,0.00003229814,0.00012780895,0.000035159082,0.000025188172,0.000016089889],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024387939,0.00006255635,0.0024530364,0.00011420194,0.00020054504,0.0000035996907,0.00018867069,0.89690447,0.04611598,0.046137974,0.006718156,0.0010764534],"study_design_scores_gemma":[0.00064956973,0.00027929674,0.004767366,0.00010100287,0.00007779509,0.000010217598,0.0005801809,0.3598304,0.57657284,0.005428076,0.051096316,0.0006069276],"about_ca_topic_score_codex":0.0063796905,"about_ca_topic_score_gemma":0.0075000646,"teacher_disagreement_score":0.537074,"about_ca_system_score_codex":0.00005671473,"about_ca_system_score_gemma":0.000012067907,"threshold_uncertainty_score":0.96442264},"labels":[],"label_agreement":null},{"id":"W2910438505","doi":"","title":"Demand Response Planner for Building Districts","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Planner; Computer science; Demand response; Architectural engineering; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.012516097209744207,"score_gpt":0.2194129481298134,"score_spread":0.2068968509200692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910438505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19874221,0.00073192833,0.7808957,0.0018784091,0.001053225,0.00057431636,0.00011885793,0.00077225966,0.015233113],"genre_scores_gemma":[0.90656596,0.00029727092,0.08666489,0.000056794594,0.00014898341,0.00034384555,0.0005212865,0.00014333331,0.0052576005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967743,0.0014733924,0.00044076907,0.0005956306,0.0002888314,0.0004270896],"domain_scores_gemma":[0.99554247,0.0015912968,0.00016911456,0.0017972449,0.00074225414,0.00015761275],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004941801,0.00036513052,0.00032866234,0.00024515082,0.0002314472,0.00031058292,0.0010291301,0.0002707935,0.0000525134],"category_scores_gemma":[0.0013103184,0.00041261138,0.000184886,0.00024117588,0.00011458558,0.00007471454,0.0009356305,0.00034414814,0.000029819244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078380096,0.0013325711,0.003664471,0.004521323,0.0023716507,0.000057143436,0.021377748,0.4376648,0.024957294,0.16221601,0.26364776,0.07740544],"study_design_scores_gemma":[0.0011569366,0.0000010523725,0.006351025,0.002358767,0.00015525371,0.0000069759035,0.00006147174,0.49294227,0.10101507,0.0052576354,0.38942862,0.0012649159],"about_ca_topic_score_codex":0.00008380583,"about_ca_topic_score_gemma":0.00019368585,"teacher_disagreement_score":0.7078238,"about_ca_system_score_codex":0.0002259732,"about_ca_system_score_gemma":0.00007070355,"threshold_uncertainty_score":0.9998326},"labels":[],"label_agreement":null},{"id":"W2910687460","doi":"10.1109/tcsii.2019.2891704","title":"Residential Power Forecasting Using Load Identification and Graph Spectral Clustering","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits & Systems II Express Briefs","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Cluster analysis; Autoregressive model; Computer science; Identification (biology); Spectral clustering; Power (physics); Data mining; Artificial neural network; Energy (signal processing); Autoregressive integrated moving average; Real-time computing; Artificial intelligence; Time series; Machine learning; Statistics; Mathematics","score_opus":0.018542383442507505,"score_gpt":0.20863053079784336,"score_spread":0.19008814735533586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910687460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.468474,0.00018409244,0.5247812,0.000006837054,0.0045992406,0.00043453783,0.000017477641,0.0003465284,0.0011560799],"genre_scores_gemma":[0.9987127,0.0000309211,0.00010847444,0.000012429342,0.00018344882,0.00006735432,0.000002884458,0.00010085867,0.0007808981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99791783,0.00006209184,0.00057256385,0.0004963225,0.0004872734,0.00046389783],"domain_scores_gemma":[0.9991099,0.000055104156,0.00010109094,0.00054125534,0.00007248117,0.000120146666],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030983804,0.0003196305,0.0003257794,0.00032295246,0.0003006905,0.0002479275,0.00021113998,0.00013760636,0.000053409054],"category_scores_gemma":[0.0000037716825,0.00038316337,0.0001129837,0.00030198946,0.00003866665,0.0005697042,0.0000062011354,0.0002627484,0.000035934827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008565021,0.000025281008,0.000038599293,0.00023898123,0.00012175817,0.000009124719,0.00071380124,0.9146183,0.08338943,0.00004999315,0.00012285692,0.0006633102],"study_design_scores_gemma":[0.0017299822,0.00013284675,0.0012375717,0.0010220343,0.00019936723,0.00025910026,0.0007708062,0.9465658,0.04373651,0.000034295506,0.0030768935,0.0012347795],"about_ca_topic_score_codex":0.00038918128,"about_ca_topic_score_gemma":0.00006874286,"teacher_disagreement_score":0.53023875,"about_ca_system_score_codex":0.00030479877,"about_ca_system_score_gemma":0.000025858639,"threshold_uncertainty_score":0.999862},"labels":[],"label_agreement":null},{"id":"W2911134710","doi":"10.1109/epec.2018.8598374","title":"Possible Approaches to Trade Non-Electric Energy Sources in the Next Generation Smart Grids","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Smart grid; Electricity; Computer science; Flexibility (engineering); Profit (economics); Electricity generation; Environmental economics; Electric energy; Cogeneration; Energy (signal processing); Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.08554389561997498,"score_gpt":0.2039835036647471,"score_spread":0.11843960804477212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911134710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7962967,0.00017126491,0.0981773,0.0015242253,0.00073797756,0.00024230235,5.751756e-7,0.000307469,0.10254219],"genre_scores_gemma":[0.9964419,0.000020904596,0.001197423,0.0007127834,0.0009899719,0.000097097676,0.000008490257,0.000026360765,0.0005050902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913245,0.000030632276,0.00017298039,0.00019221344,0.00017481066,0.00029693168],"domain_scores_gemma":[0.9996354,0.000021057182,0.000010603381,0.00028230087,0.0000054149905,0.00004521873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020036293,0.00014770035,0.0001060906,0.00021572132,0.000071187016,0.00011691768,0.00026711574,0.000051753726,0.000051948187],"category_scores_gemma":[0.0000055269206,0.00011033541,0.00003316016,0.0007051107,0.00001442342,0.00014392073,0.000030627958,0.0000678497,0.00004946314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013904678,0.0001349241,0.0017384957,0.00003716108,0.000109380635,0.000009277758,0.0040126387,0.74896955,0.030367807,0.027469587,0.14213502,0.045002252],"study_design_scores_gemma":[0.00019702436,0.00011328514,0.009510967,0.0000055822948,0.000012611586,0.000003865836,0.0002567087,0.88089746,0.048448827,0.00009025802,0.060193095,0.00027033812],"about_ca_topic_score_codex":0.000209916,"about_ca_topic_score_gemma":0.0010832263,"teacher_disagreement_score":0.20014518,"about_ca_system_score_codex":0.000060947124,"about_ca_system_score_gemma":0.0000076228625,"threshold_uncertainty_score":0.44993475},"labels":[],"label_agreement":null},{"id":"W2911347525","doi":"10.1109/tpwrs.2019.2897727","title":"A Review of Power System Flexibility With High Penetration of Renewables","year":2019,"lang":"en","type":"review","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":470,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Internet Registration Authority","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Risk analysis (engineering); Computer science; Volatility (finance); Reliability engineering; Environmental economics; Power (physics); Computer security; Business; Engineering; Economics; Electrical engineering; Finance","score_opus":0.02779842270905443,"score_gpt":0.2538902912757321,"score_spread":0.22609186856667768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911347525","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000039765305,0.82890934,0.16188267,0.0000016435573,0.0037450476,0.0018954491,0.00020749435,0.0002240111,0.0031303556],"genre_scores_gemma":[0.022095406,0.97682285,0.000090548725,0.000005038692,0.000017900524,0.00042052666,0.00003194482,0.00013826585,0.00037753064],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.99684775,0.00024695953,0.001603355,0.00047929038,0.0005446352,0.00027803192],"domain_scores_gemma":[0.9975925,0.00013909025,0.000528139,0.0014810177,0.00018060528,0.000078636745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057095196,0.0006019815,0.002680283,0.0004012498,0.00003333877,0.000022438107,0.0003782997,0.0002906263,0.00006700131],"category_scores_gemma":[0.000003160391,0.00047477637,0.00051484787,0.00070701865,0.000045422228,0.00012812902,0.0000020475063,0.0002430648,0.000047329184],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011322501,0.000088746434,1.7256629e-7,0.81690043,0.0011462785,0.000003859436,0.000031401578,0.17566346,0.0000034154305,0.00021401161,0.0015470989,0.0043897782],"study_design_scores_gemma":[0.00023030753,0.00025943274,6.1072046e-7,0.40877876,0.0017260717,0.00004186111,0.000056880275,0.0004679202,0.00007776184,2.4374216e-7,0.5878309,0.00052924553],"about_ca_topic_score_codex":0.00019271468,"about_ca_topic_score_gemma":0.000033860062,"teacher_disagreement_score":0.5862838,"about_ca_system_score_codex":0.00046049594,"about_ca_system_score_gemma":0.00013179671,"threshold_uncertainty_score":0.9997704},"labels":[],"label_agreement":null},{"id":"W2911523418","doi":"10.1109/mwscas.2018.8624108","title":"Is Economic Feasibility of BESS Energy Price Arbitrage Jurisdiction Dependent","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Profit (economics); Energy storage; Spot contract; Computer science; Microeconomics; Business; Environmental economics; Economics; Power (physics); Finance","score_opus":0.013378882666038485,"score_gpt":0.22632938157113067,"score_spread":0.21295049890509218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911523418","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6968867,0.00004078786,0.07604447,0.00006999922,0.0013962949,0.000084788655,0.0000074276813,0.00032952955,0.22514],"genre_scores_gemma":[0.99796677,0.000035566172,0.0005333619,0.00008683203,0.0002450005,0.00001023007,0.0000033717947,0.000020535366,0.0010983262],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993105,0.000011243295,0.00022869944,0.00018531425,0.00009452517,0.00016969901],"domain_scores_gemma":[0.9995203,0.000013574618,0.00002817022,0.00036687826,0.000022002036,0.000049068116],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011825338,0.00011125245,0.00012724416,0.0000762152,0.000024760435,0.00001204338,0.00013708592,0.000051574385,0.000933983],"category_scores_gemma":[0.0000023390187,0.000114846436,0.0000497586,0.000063309264,0.000033490345,0.000111368885,0.000052108124,0.000046959878,0.000095031115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001594437,0.00056507066,0.05236362,0.0006090094,0.0015312791,0.000014674511,0.0017596931,0.5978331,0.03737642,0.13888448,0.15539482,0.013508376],"study_design_scores_gemma":[0.00086430693,0.00014127864,0.05002274,0.00002118534,0.000060653172,0.0000049464447,0.00009705382,0.30771732,0.5830246,0.0017243354,0.055768397,0.00055317406],"about_ca_topic_score_codex":0.00029146532,"about_ca_topic_score_gemma":0.00041944603,"teacher_disagreement_score":0.54564816,"about_ca_system_score_codex":0.00018899576,"about_ca_system_score_gemma":0.000011178289,"threshold_uncertainty_score":0.9999793},"labels":[],"label_agreement":null},{"id":"W2911905556","doi":"10.1109/tste.2019.2897288","title":"Demand Response Strategy Applied to Residential Electric Water Heaters Using Dynamic Programming and K-Means Clustering","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Cluster analysis; Demand response; Peak demand; Peaking power plant; Computer science; Silhouette; Consumption (sociology); Process (computing); Dynamic demand; Dynamic programming; Energy consumption; Cluster (spacecraft); Load management; Demand management; Hierarchical clustering; Control (management); Electricity; Power (physics); Engineering; Electric power system; Artificial intelligence; Electrical engineering; Algorithm","score_opus":0.004593137353370297,"score_gpt":0.1996663807054152,"score_spread":0.1950732433520449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911905556","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4296008,0.000025253621,0.569321,0.000029565877,0.00025897435,0.0002453819,8.12148e-7,0.00023776981,0.00028045144],"genre_scores_gemma":[0.9954539,0.000026751368,0.00092713913,0.00005820637,0.00003532987,0.00013257343,0.000002817847,0.00010775074,0.0032555375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980805,0.000058236306,0.00029376967,0.00043751672,0.00023442708,0.000895567],"domain_scores_gemma":[0.9993657,0.00004376774,0.00001874379,0.00036004838,0.0000472318,0.00016449505],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029782427,0.00031913165,0.0002612244,0.0007524604,0.00022255449,0.00018743402,0.00015212363,0.00011548323,0.000051814448],"category_scores_gemma":[0.0000011878262,0.000317179,0.00006381312,0.00048755,0.00001973564,0.00023883495,0.000008351108,0.00017856073,0.000017878374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043839027,0.000025080622,0.000002442524,0.00012315609,0.00009248633,0.00004323464,0.00023204104,0.9388795,0.05645088,0.000073200164,0.000017330602,0.0036222816],"study_design_scores_gemma":[0.0011279362,0.00032132503,0.00009885071,0.000046251032,0.00009576562,0.000033009044,0.0019433497,0.86352295,0.12478362,0.000059780927,0.0072112787,0.0007559137],"about_ca_topic_score_codex":0.00033508876,"about_ca_topic_score_gemma":0.00012306838,"teacher_disagreement_score":0.5683939,"about_ca_system_score_codex":0.0005833813,"about_ca_system_score_gemma":0.00003258555,"threshold_uncertainty_score":0.99992806},"labels":[],"label_agreement":null},{"id":"W2913739661","doi":"10.1016/j.apenergy.2019.01.091","title":"Peer-to-peer energy trading among smart homes","year":2019,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":250,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Renewable energy; Environmental economics; Energy storage; Pareto principle; Computer science; Business; Microeconomics; Economics; Operations management; Engineering; Electrical engineering","score_opus":0.00540038303934944,"score_gpt":0.17506579771738612,"score_spread":0.16966541467803667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913739661","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2612592,0.00012283964,0.043434165,0.00041950727,0.0029589704,0.00015819754,0.0000064083542,0.0015731765,0.6900675],"genre_scores_gemma":[0.96826994,0.000027712784,0.0008182289,0.0005139619,0.00043248935,0.00018790668,0.00007191062,0.00016052077,0.029517308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977782,0.000013902289,0.0003329594,0.00048517843,0.00070316,0.0006866106],"domain_scores_gemma":[0.99891335,0.00005604918,0.00003607764,0.0006917023,0.000059646238,0.00024315323],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019200573,0.00039457946,0.0003729612,0.0003215441,0.00006405801,0.00009249115,0.00044731123,0.00015240096,0.00049199944],"category_scores_gemma":[0.000009319803,0.0004277135,0.000106201966,0.00049965363,0.000028754348,0.00013261831,0.00014145204,0.00013229113,0.00031352192],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013783359,0.00003461588,0.0006606564,0.00003436044,0.00021087026,0.000012301721,0.00019297343,0.6879656,0.0063538603,0.17002338,0.120648205,0.013849429],"study_design_scores_gemma":[0.00048790334,0.00003295116,0.002513511,0.00001778604,0.000027347707,0.0000021522906,0.00012213318,0.040724352,0.022550752,0.0007589214,0.9320728,0.00068938197],"about_ca_topic_score_codex":0.0003447074,"about_ca_topic_score_gemma":0.00020630215,"teacher_disagreement_score":0.8114246,"about_ca_system_score_codex":0.00017174153,"about_ca_system_score_gemma":0.000011094532,"threshold_uncertainty_score":0.9998175},"labels":[],"label_agreement":null},{"id":"W2914984418","doi":"10.1049/iet-stg.2018.0033","title":"New real‐time demand‐side management approach for energy management systems","year":2019,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Energy management system; Energy management; Computer science; Microgrid; Controller (irrigation); Demand side; Control (management); Real-time computing; Energy (signal processing)","score_opus":0.005974474092871992,"score_gpt":0.17829602310520315,"score_spread":0.17232154901233115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914984418","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031386386,0.0005481355,0.4169092,0.00007875387,0.0076126643,0.002082115,0.000028662835,0.0016413887,0.56796044],"genre_scores_gemma":[0.29115054,0.004535765,0.19602327,0.0008158089,0.00860774,0.0054230858,0.0021393585,0.0013714953,0.48993292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99740946,0.00003946114,0.0005500172,0.0006827424,0.00048785712,0.000830437],"domain_scores_gemma":[0.998541,0.00004535438,0.00007791594,0.0010726386,0.000032857824,0.0002302622],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003611514,0.00049899734,0.00049921026,0.00032837034,0.00008836458,0.00014576205,0.000597467,0.00013019334,0.0001115521],"category_scores_gemma":[0.0000018189592,0.0005191266,0.00020880415,0.00034792404,0.00001652948,0.00020867975,0.00025291397,0.00010113278,0.000548548],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000347702,0.000045758745,0.00017443825,0.0010022365,0.0008456214,0.000021231415,0.00003365765,0.61543983,0.00015217456,0.032344934,0.34692147,0.0029838728],"study_design_scores_gemma":[0.0017142815,0.0000777762,0.001344706,0.00010289167,0.00021941589,0.000007959849,0.000111039524,0.2538114,0.00033009416,0.00017289916,0.74134135,0.0007662036],"about_ca_topic_score_codex":0.00014686366,"about_ca_topic_score_gemma":0.000006943849,"teacher_disagreement_score":0.39441988,"about_ca_system_score_codex":0.00027874112,"about_ca_system_score_gemma":0.0000090923795,"threshold_uncertainty_score":0.99972606},"labels":[],"label_agreement":null},{"id":"W2915843629","doi":"10.1109/mpe.2018.2884112","title":"Distributed Generation and Megacities: Are Renewables the Answer?","year":2019,"lang":"en","type":"article","venue":"IEEE Power and Energy Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Renewable energy; Distributed generation; Electricity generation; Electricity; Electricity retailing; Stand-alone power system; Environmental economics; Electric power transmission; Mains electricity; Engineering; Electricity market; Computer science; Electrical engineering; Voltage; Power (physics); Economics","score_opus":0.006712175807085511,"score_gpt":0.17357989777663482,"score_spread":0.1668677219695493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915843629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.950065,0.002497322,0.02189053,0.0006382983,0.0029363076,0.00009203036,0.000050094153,0.00035371687,0.021476693],"genre_scores_gemma":[0.99541056,0.0007811811,0.000074600866,0.00021738547,0.0002265636,0.000020140556,0.000049708884,0.000028572364,0.0031912634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993159,0.000019155643,0.00014696624,0.0001924102,0.00011876113,0.00020681407],"domain_scores_gemma":[0.9996121,0.000028324579,0.000023912862,0.00025493983,0.000023571978,0.000057162426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008256293,0.00016894344,0.00014905597,0.00005229839,0.000067277455,0.0000833873,0.00008423274,0.00005504717,0.000071191396],"category_scores_gemma":[0.0000050150247,0.00012803714,0.000024922223,0.00011392094,0.000042414038,0.00013636152,0.000035950263,0.000048773938,0.000012132048],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023212599,0.000029113402,0.0029324477,0.000102719976,0.00025584523,0.0000170879,0.00033971263,0.7273331,0.028175725,0.007893808,0.22942854,0.0034686474],"study_design_scores_gemma":[0.0006184855,0.00005788365,0.009037375,0.000033079672,0.000038425198,0.000016654842,0.0001771284,0.17283653,0.004803384,0.00021594402,0.81175804,0.00040708017],"about_ca_topic_score_codex":0.00004144303,"about_ca_topic_score_gemma":0.00026851607,"teacher_disagreement_score":0.5823295,"about_ca_system_score_codex":0.000024409223,"about_ca_system_score_gemma":0.0000035586913,"threshold_uncertainty_score":0.5221203},"labels":[],"label_agreement":null},{"id":"W2916201513","doi":"","title":"SCADA system for remote control and monitoring of grid connected inverters","year":2018,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"SCADA; Grid; Supervisory control; Engineering; Renewable energy; Control engineering; Reliability engineering; Real-time computing; Computer science; Embedded system; Control (management); Electrical engineering","score_opus":0.01682874924162081,"score_gpt":0.22847590256733738,"score_spread":0.21164715332571657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2916201513","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8605605,0.0001767526,0.002026393,0.00001936914,0.076168194,0.002539947,0.00024029719,0.000795685,0.057472885],"genre_scores_gemma":[0.95344293,0.0003544842,0.0012122422,0.0000014615115,0.01832782,0.0000023878192,0.0003534794,0.00020350251,0.026101697],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966886,0.00043767993,0.0003973999,0.00079506874,0.00091564487,0.0007656144],"domain_scores_gemma":[0.9971234,0.00046831844,0.00023120706,0.0006543521,0.00115949,0.00036322238],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006945467,0.0004919152,0.0008561894,0.0017357579,0.00081965746,0.00010481973,0.001043623,0.00068425934,0.0000069335933],"category_scores_gemma":[0.00012879443,0.0006519015,0.00027886048,0.0010871646,0.0003084163,0.0004485165,0.00019148606,0.00065378373,0.00000781781],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.13354842,0.0009643778,0.0045950743,0.05340843,0.027530944,0.0118836295,0.014671152,0.03007575,0.47184592,0.032793988,0.19927984,0.01940247],"study_design_scores_gemma":[0.04290732,0.0031786894,0.0034551802,0.0053321854,0.0040708333,0.000056235443,0.07368029,0.05665778,0.24032933,0.00012287505,0.5655312,0.004678112],"about_ca_topic_score_codex":0.0013418344,"about_ca_topic_score_gemma":0.00024586834,"teacher_disagreement_score":0.36625132,"about_ca_system_score_codex":0.0017629263,"about_ca_system_score_gemma":0.00035721826,"threshold_uncertainty_score":0.9995932},"labels":[],"label_agreement":null},{"id":"W2917956205","doi":"10.1109/icassp.2019.8682543","title":"Wavenilm: A Causal Neural Network for Power Disaggregation from the Complex Power Signal","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power (physics); Convergence (economics); Convolutional neural network; Aggregate (composite); Artificial neural network; SIGNAL (programming language); AC power; Artificial intelligence; Machine learning; Data mining","score_opus":0.021900797175961086,"score_gpt":0.22496269030008248,"score_spread":0.2030618931241214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2917956205","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17488655,0.0010405444,0.7451105,0.0026867848,0.025356185,0.004157121,0.0005917002,0.0019742872,0.044196293],"genre_scores_gemma":[0.9918484,0.000015576328,0.0038736658,0.0005773623,0.0013941611,0.00021272915,0.0010697518,0.00012482505,0.00088352634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983729,0.000047128844,0.00038173952,0.00044510255,0.00028825612,0.00046486032],"domain_scores_gemma":[0.9986565,0.00031157283,0.0000867971,0.00082969805,0.000050364313,0.00006507241],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00018976722,0.00042366178,0.0003694106,0.00003792195,0.0000804732,0.00016900743,0.0005479919,0.00022216683,0.0013032025],"category_scores_gemma":[0.000012755812,0.0003237692,0.00023976952,0.0000825971,0.000034442026,0.000070828784,0.00053708773,0.00040931776,0.00009983869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001678648,0.000008733473,0.0004670682,0.00002390954,0.00023846919,0.0000014210821,0.00011301399,0.79443675,0.000030126264,0.0012502269,0.20312689,0.00028659494],"study_design_scores_gemma":[0.0004105875,0.00003504525,0.021739317,0.0000722333,0.00009778043,7.264356e-7,0.00006166464,0.8808471,0.000037985523,0.0018794036,0.09430037,0.0005178133],"about_ca_topic_score_codex":0.0002229928,"about_ca_topic_score_gemma":0.00019040557,"teacher_disagreement_score":0.8169618,"about_ca_system_score_codex":0.0001432311,"about_ca_system_score_gemma":0.000019809846,"threshold_uncertainty_score":0.99992144},"labels":[],"label_agreement":null},{"id":"W2918273042","doi":"10.1109/globalsip.2018.8646530","title":"Distributed Assimilation of Grid Conditions and Load Integration via Social Learning","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Grid; Computer science; Distributed computing; Smart grid; Grid computing; Distributed learning; Engineering; Electrical engineering","score_opus":0.00762672080430753,"score_gpt":0.21607837543540398,"score_spread":0.20845165463109644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918273042","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2779091,0.000007206155,0.6996861,0.0001136443,0.00037444162,0.00006605217,0.000012324058,0.00026444957,0.021566663],"genre_scores_gemma":[0.99917495,0.000003958131,0.00037838687,0.000008843153,0.00019968498,0.000005288818,0.0001273319,0.000007011325,0.0000945527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968934,0.000009934418,0.000101114056,0.000057143712,0.00007628525,0.00006621156],"domain_scores_gemma":[0.999862,0.000013284689,0.00001832993,0.00003792092,0.0000542293,0.000014208528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005882006,0.000050916035,0.00005788094,0.000035172678,0.000062905885,0.000011043849,0.000022171262,0.00003040907,0.00013532204],"category_scores_gemma":[0.00001605845,0.000050839884,0.000013005028,0.000095345335,0.0000379279,0.00009014259,0.000013521099,0.000044361754,0.000010075534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004956722,0.00013999596,0.02793337,0.00024291592,0.0006024836,0.00000302107,0.004665088,0.44064632,0.19063835,0.06624196,0.22036944,0.04846751],"study_design_scores_gemma":[0.00036161407,0.00006612985,0.22415149,0.000015195281,0.000035464054,0.0000011005441,0.00024957897,0.73504114,0.026217174,0.0004919486,0.013194069,0.00017508412],"about_ca_topic_score_codex":0.000018677123,"about_ca_topic_score_gemma":0.00006962981,"teacher_disagreement_score":0.72126585,"about_ca_system_score_codex":0.000047039375,"about_ca_system_score_gemma":0.0000031792154,"threshold_uncertainty_score":0.20731904},"labels":[],"label_agreement":null},{"id":"W2919708585","doi":"10.1016/j.energy.2019.116138","title":"A general framework for customized transition to smart homes","year":2019,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Consumption (sociology); Investment (military); Electricity; Work (physics); Home automation; Profit (economics); Context (archaeology); Environmental economics; Payback period; Return on investment; Business; Computer science; Engineering; Economics; Microeconomics; Production (economics); Telecommunications; Geography","score_opus":0.005487191187511561,"score_gpt":0.20127713713458587,"score_spread":0.1957899459470743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2919708585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20963435,0.00009556134,0.781911,0.0003525798,0.0021216243,0.00017942998,0.0000073058964,0.00042070434,0.00527743],"genre_scores_gemma":[0.9562053,0.00003497395,0.03863429,0.0011245082,0.00071993424,0.0003061241,0.00005243323,0.00008579191,0.0028366623],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992863,0.000012063957,0.00014174727,0.0001829018,0.00011147391,0.00026549754],"domain_scores_gemma":[0.99959254,0.00004789919,0.000010632344,0.0002555132,0.000017240578,0.000076171826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006939005,0.0001403814,0.00017914291,0.000113975846,0.000024495845,0.000026410815,0.00012094342,0.00007816182,0.00018291584],"category_scores_gemma":[0.000008884143,0.0001472874,0.00008829779,0.00015429955,0.0000047774142,0.000065213084,0.000017195274,0.000048462374,0.00010336622],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045095214,0.000010975478,0.000027728223,0.000029657513,0.000066768254,0.0000012886919,0.000101669684,0.91669714,0.0020651536,0.065059036,0.0125096645,0.0033858216],"study_design_scores_gemma":[0.0014223953,0.00009328402,0.0005692008,0.00005022084,0.000032182117,0.0000015269239,0.000050726612,0.25521588,0.013967165,0.004257687,0.72385055,0.0004891972],"about_ca_topic_score_codex":0.000048692338,"about_ca_topic_score_gemma":0.000024164452,"teacher_disagreement_score":0.74657094,"about_ca_system_score_codex":0.000067740526,"about_ca_system_score_gemma":0.0000052084492,"threshold_uncertainty_score":0.60062057},"labels":[],"label_agreement":null},{"id":"W2920242169","doi":"10.1088/1755-1315/238/1/012051","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2019,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Computer science; Energy storage; Smart grid; Environmental science; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.005201973265721117,"score_gpt":0.15379829534167694,"score_spread":0.14859632207595583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920242169","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9951571,0.0001127453,0.0036231088,0.000008085121,0.000118888776,0.00021933457,0.000027420498,0.000027592863,0.0007057021],"genre_scores_gemma":[0.9996634,0.0001245273,0.000078386125,0.000013498444,0.000007530122,0.000010477783,0.000002883107,0.0000084787425,0.000090786685],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9992122,0.000038684106,0.00012080176,0.00016843302,0.0002400726,0.0002198082],"domain_scores_gemma":[0.99963194,0.000024922767,0.00003235774,0.00020914218,0.00000639734,0.00009526446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020359947,0.00013285337,0.00017646488,0.000059800546,0.00013870512,0.00007287216,0.00014628374,0.000028018896,0.00005773447],"category_scores_gemma":[0.0000021166986,0.000116780415,0.000011365773,0.00008123052,0.00074268726,0.00055445853,0.000047461523,0.0001345639,0.0000045566467],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012201794,0.000032965083,0.011635943,0.00017319829,0.000048923113,0.0000069899556,0.0018119682,0.06949485,0.91570795,0.00013328943,0.000004215531,0.0008276995],"study_design_scores_gemma":[0.00197176,0.0009994922,0.63232726,0.00017049217,0.00005610036,0.000065697925,0.01075072,0.10503851,0.24725844,0.000022214215,0.0007373699,0.00060194137],"about_ca_topic_score_codex":0.00024975615,"about_ca_topic_score_gemma":0.000083992825,"teacher_disagreement_score":0.6684495,"about_ca_system_score_codex":0.00002299212,"about_ca_system_score_gemma":0.000014120457,"threshold_uncertainty_score":0.4762167},"labels":[],"label_agreement":null},{"id":"W2921952589","doi":"10.22109/jemt.2019.119235.1064","title":"Robust Energy Management of a Microgrid with Uncertain Price, Renewable Generation, and Load using Taguchi’s Orthogonal Array Method","year":2019,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Microgrid; Renewable energy; Taguchi methods; Mathematical optimization; Robust optimization; Orthogonal array; Monte Carlo method; Computer science; Energy management; Reliability engineering; Energy (signal processing); Engineering; Mathematics; Statistics; Electrical engineering","score_opus":0.010841688308818301,"score_gpt":0.19922914772999809,"score_spread":0.1883874594211798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921952589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29509372,0.0066626184,0.6860065,0.00035838832,0.00070962193,0.00022691475,0.000003066113,0.00015515338,0.01078403],"genre_scores_gemma":[0.67003477,0.008901973,0.31818473,0.000104387604,0.00016172022,0.000028603794,0.000009850193,0.00009629548,0.0024776836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983197,0.00003770995,0.0005995623,0.00031685625,0.0003646899,0.0003614959],"domain_scores_gemma":[0.99908954,0.000020348814,0.00031387262,0.00034873854,0.00015004385,0.000077455006],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037755672,0.00030839673,0.00048988254,0.0009033171,0.00006621037,0.000043981232,0.00028220282,0.00013585584,0.000032625205],"category_scores_gemma":[0.0000024786698,0.00026856194,0.00005879558,0.0007419383,0.00008737325,0.00020754586,0.000192045,0.00013668057,4.893451e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082097045,0.0000968432,0.0030965437,0.0004185186,0.0022739156,0.00019604074,0.000026488027,0.8672485,0.010747793,0.09632749,0.0014355353,0.018050246],"study_design_scores_gemma":[0.012868035,0.0021015934,0.0034049936,0.0017298368,0.0026146455,0.0013151783,0.0019353462,0.3182997,0.0850222,0.008964618,0.5590031,0.002740712],"about_ca_topic_score_codex":0.000049285143,"about_ca_topic_score_gemma":0.00007237265,"teacher_disagreement_score":0.5575676,"about_ca_system_score_codex":0.00013079685,"about_ca_system_score_gemma":0.00002028561,"threshold_uncertainty_score":0.99997663},"labels":[],"label_agreement":null},{"id":"W2922529414","doi":"10.1007/s40565-019-0510-0","title":"Enhancing scalability of peer-to-peer energy markets using adaptive segmentation method","year":2019,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Market segmentation; Scalability; Computer science; Cluster analysis; Peer-to-peer; Novelty; Market clearing; Clearing; Segmentation; Energy market; Distributed computing; Artificial intelligence; Business; Economics; Microeconomics; Marketing; Engineering","score_opus":0.01051726490520023,"score_gpt":0.23468933896600636,"score_spread":0.22417207406080614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922529414","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3364902,0.00042311673,0.66043305,0.00002406735,0.0012668143,0.000049008013,0.000003805004,0.000017760127,0.0012921573],"genre_scores_gemma":[0.9928698,0.0000316218,0.006300654,0.000038468894,0.00013119739,0.0000031197678,0.0000015285508,0.000047969505,0.0005756488],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979145,0.00015802924,0.0007760315,0.00019874006,0.00070562016,0.0002470985],"domain_scores_gemma":[0.99879616,0.000077288496,0.00029821205,0.00024631567,0.0004266551,0.00015536814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001162044,0.00021511734,0.00050343963,0.00026328128,0.00003302264,0.000044597167,0.00016127974,0.0000955704,0.000028248438],"category_scores_gemma":[0.000028016546,0.00019728215,0.00012000335,0.00016784147,0.000015561325,0.0002689029,0.00006866232,0.00010923778,9.1285744e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016287976,0.000035537356,0.00020245052,0.000103476166,0.0003116855,0.000008946725,0.00058225746,0.9302881,0.058994107,0.0015325742,0.00046549688,0.007312484],"study_design_scores_gemma":[0.0014699124,0.000673036,0.0023428637,0.00066088646,0.00016180915,0.00016245164,0.0029655294,0.8689871,0.10633648,0.00029451455,0.015319858,0.000625555],"about_ca_topic_score_codex":0.00030099484,"about_ca_topic_score_gemma":0.000062348445,"teacher_disagreement_score":0.6563796,"about_ca_system_score_codex":0.00021301456,"about_ca_system_score_gemma":0.000029399896,"threshold_uncertainty_score":0.80449325},"labels":[],"label_agreement":null},{"id":"W2924826474","doi":"10.1109/tsg.2019.2906823","title":"Hierarchical and Decentralized Stochastic Energy Management for Smart Distribution Systems With High BESS Penetration","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Energy management; Mathematical optimization; Markov decision process; Computer science; Energy management system; Partially observable Markov decision process; Markov process; Smart grid; Computational complexity theory; Markov chain; Engineering; Markov model; Energy (signal processing); Mathematics; Electrical engineering; Algorithm","score_opus":0.005864645785266788,"score_gpt":0.1854539649386169,"score_spread":0.1795893191533501,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2924826474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10746042,0.000048670314,0.8878609,0.000072571034,0.0031908946,0.00073221815,0.00014069601,0.0002969646,0.00019665723],"genre_scores_gemma":[0.9977117,0.0001223212,0.00063578755,0.00003481431,0.00011127747,0.00064291846,0.000195795,0.00006134467,0.00048401675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860364,0.00003626423,0.00029078434,0.00038152453,0.0002938571,0.00039390812],"domain_scores_gemma":[0.99937475,0.00008182069,0.000037214013,0.0003318801,0.000044371012,0.0001299734],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001210254,0.0002871891,0.0002681478,0.00015345353,0.00014248256,0.000096050615,0.000116619005,0.000093168404,0.000033896544],"category_scores_gemma":[8.220567e-7,0.00027350927,0.00006613078,0.00021865265,0.000039455004,0.00017851684,0.0000021324204,0.00013568434,0.000024664396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021183549,0.00007967078,0.000033650056,0.00020715897,0.00028040487,0.000003506671,0.000022983666,0.9915832,0.00020668724,0.0044190763,0.0007772201,0.002174569],"study_design_scores_gemma":[0.007434727,0.00092551205,0.0053964527,0.00038717056,0.00063571025,0.00004347632,0.00013397074,0.93610334,0.006273419,0.00017628621,0.04117509,0.0013148362],"about_ca_topic_score_codex":0.000089232024,"about_ca_topic_score_gemma":0.000084722145,"teacher_disagreement_score":0.89025134,"about_ca_system_score_codex":0.00018934529,"about_ca_system_score_gemma":0.000010644516,"threshold_uncertainty_score":0.9999717},"labels":[],"label_agreement":null},{"id":"W2926367482","doi":"10.1049/iet-gtd.2018.6751","title":"Generation maintenance scheduling in virtual power plants","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Reliability engineering; Electric power system; Scheduling (production processes); Computer science; Renewable energy; Grid; Wind power; Virtual power plant; Distributed generation; Engineering; Power (physics); Electrical engineering; Operations management","score_opus":0.01351030306966918,"score_gpt":0.2110844420116391,"score_spread":0.1975741389419699,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2926367482","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5487948,0.00012169813,0.44908237,0.00013977062,0.0009903497,0.0002109966,0.000031780946,0.00015454677,0.0004736648],"genre_scores_gemma":[0.9964562,0.00020298132,0.0005695025,0.000070549286,0.00024280831,0.0000434556,0.0021372656,0.00003054415,0.00024667283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860287,0.000053272077,0.000406337,0.00032657498,0.000296521,0.0003144238],"domain_scores_gemma":[0.99958324,0.000011966845,0.0000392116,0.00023336559,0.000045391887,0.000086791835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002599722,0.0002145973,0.00017616604,0.00010075354,0.000072599076,0.00007014251,0.00011207995,0.00014815916,0.00028097356],"category_scores_gemma":[0.000009641092,0.00022133932,0.000060801878,0.00023475596,0.000012493135,0.00034942845,0.000011329339,0.00017158713,0.00016347795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012331894,0.000028748018,0.00018908565,0.000012279517,0.000010486102,0.0000030236672,0.00007856771,0.79089236,0.1973656,0.0018462739,0.004841217,0.004720028],"study_design_scores_gemma":[0.000774893,0.00004716856,0.0017938209,0.0000473149,0.0000058916594,0.0000029115085,0.000045114462,0.89668655,0.07269306,0.000020814447,0.027616963,0.0002655024],"about_ca_topic_score_codex":0.000009619914,"about_ca_topic_score_gemma":0.000018915021,"teacher_disagreement_score":0.44851288,"about_ca_system_score_codex":0.00027792717,"about_ca_system_score_gemma":0.000023413619,"threshold_uncertainty_score":0.9025955},"labels":[],"label_agreement":null},{"id":"W2927980047","doi":"10.1049/iet-gtd.2018.6413","title":"Enabling electricity access: a comprehensive energy efficient approach mitigating climate/weather variability – Part II","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Environmental economics; Computer science; Probabilistic logic; National Grid; Mains electricity; Electricity generation; Population; Operations research; Power (physics); Engineering; Economics; Geography; Electrical engineering","score_opus":0.015154523473485077,"score_gpt":0.21851692153173163,"score_spread":0.20336239805824655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2927980047","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38677037,0.00020265068,0.6100776,0.00007063194,0.00055033114,0.00032882296,0.000059077534,0.00041525546,0.0015252103],"genre_scores_gemma":[0.99530447,0.0002194019,0.0010876053,0.0000879369,0.00033938116,0.00012355048,0.0027239241,0.000044402088,0.000069303416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977111,0.00017438763,0.0005638915,0.00057165883,0.00044900537,0.000529942],"domain_scores_gemma":[0.99913335,0.000051525927,0.000091894515,0.0004114245,0.00016059435,0.00015118631],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044134146,0.00033761014,0.00030588981,0.000088850815,0.00037377476,0.00015182993,0.00023161212,0.00018887078,0.00023409464],"category_scores_gemma":[0.000018204257,0.00033311942,0.00014377081,0.00057417527,0.00002678339,0.00026736912,0.00006315784,0.0002041009,0.000017699793],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018807254,0.00014413174,0.00018683342,0.00013900582,0.000045053734,8.069991e-7,0.000084755426,0.92526543,0.062758505,0.0033255836,0.0021258276,0.0059052776],"study_design_scores_gemma":[0.00054503686,0.00004360004,0.0005491926,0.0000376956,0.000039663926,0.0000025795166,0.000028922592,0.8651681,0.07989343,0.00005545278,0.05329096,0.00034534215],"about_ca_topic_score_codex":0.000027488592,"about_ca_topic_score_gemma":0.0000017735013,"teacher_disagreement_score":0.6089901,"about_ca_system_score_codex":0.0003407883,"about_ca_system_score_gemma":0.000032758737,"threshold_uncertainty_score":0.9999121},"labels":[],"label_agreement":null},{"id":"W2932392300","doi":"10.1049/iet-gtd.2018.5556","title":"Enabling electricity access: revisiting load models for AC‐grid operation ‐ Part I","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Grid; Economic shortage; Environmental economics; Electricity demand; Computer science; Stand-alone power system; Mains electricity; Electricity generation; Electricity retailing; Peak demand; Demand response; Work (physics); Load management; National Grid; Probabilistic logic; Electricity market; Distributed generation; Power (physics); Renewable energy; Electrical engineering; Engineering; Economics","score_opus":0.027659245967337605,"score_gpt":0.24533256848436005,"score_spread":0.21767332251702246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2932392300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057498008,0.00050875015,0.9386658,0.00036080778,0.0010565377,0.0008181206,0.00009706451,0.00041377844,0.0005811271],"genre_scores_gemma":[0.9908872,0.0007176713,0.0013697743,0.00011553006,0.0015188237,0.00022195737,0.0048870915,0.000050727886,0.00023117937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982565,0.000053674474,0.0005082866,0.00041626996,0.00038630096,0.0003789896],"domain_scores_gemma":[0.9992987,0.000036435085,0.000070920905,0.0002743222,0.00021284807,0.00010675402],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052691303,0.0002562891,0.00023094956,0.000071988376,0.00024047571,0.00028054178,0.00019070282,0.00015351492,0.00016041716],"category_scores_gemma":[0.000026292517,0.00026405003,0.00012316703,0.00030821073,0.000008515136,0.0010749834,0.000017905943,0.00014311129,0.000033480843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002174502,0.000019138048,0.000026871869,0.0001209625,0.000027284872,3.5755684e-7,0.00004005298,0.9049189,0.059683185,0.0014467617,0.013483472,0.02021124],"study_design_scores_gemma":[0.0005542168,0.00003431197,0.00005638817,0.000052297633,0.000033164783,0.0000010572318,0.000009743096,0.76906705,0.11927865,0.00012809545,0.110531256,0.0002537835],"about_ca_topic_score_codex":0.000012486801,"about_ca_topic_score_gemma":0.000004484883,"teacher_disagreement_score":0.93729603,"about_ca_system_score_codex":0.00044134364,"about_ca_system_score_gemma":0.00006141856,"threshold_uncertainty_score":0.99998116},"labels":[],"label_agreement":null},{"id":"W2935765054","doi":"10.1049/iet-esi.2019.0019","title":"Assessing the potential of surplus clean power in reducing GHG emissions in the building sector using game theory; a case study of Ontario, Canada","year":2019,"lang":"en","type":"article","venue":"IET Energy Systems Integration","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Electricity; Greenhouse gas; Natural gas; Environmental economics; Natural gas prices; Boiler (water heating); Electricity generation; Mains electricity; Waste management; Business; Economics; Natural resource economics; Environmental science; Engineering; Power (physics); Electrical engineering","score_opus":0.0129715920942182,"score_gpt":0.23716918825654026,"score_spread":0.22419759616232207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935765054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99061435,0.0000631866,0.0067166868,0.0000068523905,0.0015725009,0.0003203784,0.0000019804793,0.000018226898,0.00068583025],"genre_scores_gemma":[0.99975497,7.9657286e-7,0.00005490502,0.000009374414,0.00006354277,0.000027926657,0.0000032212454,0.000027492079,0.000057802994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99820685,0.00041278164,0.00062425894,0.00019420878,0.00035367205,0.00020824616],"domain_scores_gemma":[0.9991594,0.00016229389,0.00016663359,0.0004307516,0.00005767358,0.000023262375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001006817,0.00017749626,0.0002804374,0.00019335785,0.000051202078,0.00007053619,0.00022486021,0.000062352,0.000016823884],"category_scores_gemma":[0.00003487866,0.0001176638,0.00004198024,0.00041068555,0.000014984862,0.00020389623,0.00003892572,0.00022494806,8.943891e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007908133,0.000048231297,0.0023557602,0.0000298659,0.000047222475,0.000105078354,0.007241146,0.9830119,0.0061079147,0.000741634,0.000040023377,0.00026331068],"study_design_scores_gemma":[0.0006980468,0.000083801264,0.0071925344,0.00071908097,0.000053684616,0.00023596236,0.17045818,0.8181581,0.0018727237,0.000024244584,0.00023893983,0.0002647004],"about_ca_topic_score_codex":0.9800392,"about_ca_topic_score_gemma":0.96670854,"teacher_disagreement_score":0.1648538,"about_ca_system_score_codex":0.00095708115,"about_ca_system_score_gemma":0.00023649735,"threshold_uncertainty_score":0.47981906},"labels":[],"label_agreement":null},{"id":"W2936186753","doi":"10.1016/j.jare.2019.04.001","title":"Optimization unit for real-time applications in unbalanced smart distribution networks","year":2019,"lang":"en","type":"article","venue":"Journal of Advanced Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scalability; Robustness (evolution); Smart grid; Mathematical optimization; Reduction (mathematics); Computational complexity theory; Jacobian matrix and determinant; Optimization problem; Energy management; Distributed generation; Electric power system; Distributed computing; Real-time computing; Power (physics); Energy (signal processing); Algorithm; Mathematics; Engineering","score_opus":0.01633372463482647,"score_gpt":0.3036934064947747,"score_spread":0.28735968185994826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936186753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1214221,0.00023147663,0.8736111,0.0001681926,0.0004004922,0.0009956995,0.000012353903,0.000059749527,0.0030988455],"genre_scores_gemma":[0.9794845,0.0015523497,0.01738707,0.0000067394753,0.00034123543,0.00014982844,0.00018211413,0.000057573063,0.00083861826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989368,0.000047997844,0.00032333695,0.000101009144,0.00028774448,0.00030315662],"domain_scores_gemma":[0.9991888,0.00017526378,0.00006353233,0.00018636054,0.0003188585,0.00006719221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008518849,0.0000808225,0.00016998901,0.00022502053,0.00004737263,0.000027383925,0.00020174682,0.000058681995,0.000028545322],"category_scores_gemma":[0.000061027797,0.00007714045,0.00004721435,0.00066286616,0.000020521715,0.00022593653,0.000031826294,0.00028579036,0.000010216392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004681573,0.000024787076,0.0007141225,0.000034865327,0.000017401535,8.5400217e-7,0.000013151024,0.99441606,0.0016513615,0.0004001293,0.0009576668,0.0017227856],"study_design_scores_gemma":[0.0011197726,0.00014140068,0.006249607,0.00008486613,0.0000060100783,0.0000024089063,0.0001273514,0.9693114,0.0006056904,0.00022319074,0.022014553,0.00011375747],"about_ca_topic_score_codex":0.0000031697775,"about_ca_topic_score_gemma":0.0000039960746,"teacher_disagreement_score":0.8580624,"about_ca_system_score_codex":0.00027444135,"about_ca_system_score_gemma":0.000026752234,"threshold_uncertainty_score":0.31456962},"labels":[],"label_agreement":null},{"id":"W2941562081","doi":"10.1109/tii.2019.2912816","title":"A Heuristic-Based Appliance Scheduling Scheme for Smart Homes","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Council of Scientific and Industrial Research, India","keywords":"Smart grid; Scheduling (production processes); Computer science; Heuristic; Demand response; Electricity; Grid; Load management; Electric power system; Distributed computing; Scheme (mathematics); Job shop scheduling; Real-time computing; Power (physics); Mathematical optimization; Engineering; Embedded system; Electrical engineering","score_opus":0.029150851589329552,"score_gpt":0.22572639798112357,"score_spread":0.196575546391794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941562081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05563007,0.000008077846,0.93713564,0.000055785662,0.0036644347,0.0008102485,0.000063785104,0.0004665247,0.0021654272],"genre_scores_gemma":[0.9690004,0.000013838247,0.029672556,0.00020596244,0.0002447231,0.0003335462,0.000024252053,0.00006620697,0.0004385171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987733,0.000008420832,0.0005221441,0.00010642956,0.0002374446,0.00035231232],"domain_scores_gemma":[0.99926615,0.00015786983,0.000068145324,0.0003645648,0.000048989594,0.00009430657],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018944326,0.00023609528,0.0002543312,0.00021998686,0.00010085227,0.00008160688,0.00020401756,0.00020563416,0.000108274304],"category_scores_gemma":[0.000009448388,0.00025377242,0.00012938598,0.00030925934,0.000025455907,0.00026250898,0.0000011961878,0.00037331728,0.00030168518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047979785,0.000030723044,0.000020396654,0.00015967923,0.000081066515,2.4956327e-7,0.000061378305,0.9930603,0.000090070105,0.00012287445,0.0014889692,0.004836345],"study_design_scores_gemma":[0.0023838782,0.00011541816,0.0000045887878,0.00011186347,0.000044206052,8.6887724e-7,0.00018986622,0.94618917,0.017821576,0.000020093537,0.03278936,0.00032909703],"about_ca_topic_score_codex":0.000005896091,"about_ca_topic_score_gemma":0.0000034107975,"teacher_disagreement_score":0.9133703,"about_ca_system_score_codex":0.00015677314,"about_ca_system_score_gemma":0.000050645172,"threshold_uncertainty_score":0.9999915},"labels":[],"label_agreement":null},{"id":"W2942340619","doi":"","title":"Technical-economic feasibility and simulation of ÉTS' electricity saving with photovoltaic system and batteries","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Incentive; Electricity; Demand response; Incentive program; Environmental economics; Business; Finance; Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.007448637060206308,"score_gpt":0.19564866860422017,"score_spread":0.18820003154401385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942340619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98541665,0.000060769406,0.011331118,0.000003050211,0.000046899,0.00022530358,0.0000012973006,0.00017687143,0.002738062],"genre_scores_gemma":[0.99906623,0.000009324815,0.0008561917,0.0000049300975,0.00001078421,0.0000063186953,0.0000012109449,0.00001247175,0.00003256315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955684,0.000008486466,0.00014192407,0.00014532282,0.000049382696,0.00009803603],"domain_scores_gemma":[0.9997153,0.000055832137,0.000024048404,0.00017035063,0.000010026141,0.000024415229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010588208,0.00008701981,0.00015212994,0.000053459815,0.000014640263,0.000016531181,0.000034544533,0.000031681964,0.00001813283],"category_scores_gemma":[0.0000035911332,0.000074921634,0.000010015541,0.00005243639,0.000021344455,0.00011051348,0.000031761494,0.000038824237,0.0000033217839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021370224,0.0000053621143,0.1627053,0.00046279462,0.000025138705,4.0844137e-7,0.000023920058,0.82079035,0.015194334,0.0004524247,0.00002146221,0.00029712368],"study_design_scores_gemma":[0.00030785307,0.000061148596,0.19606358,0.000037404956,0.000015647041,0.0000031770214,0.000056548943,0.79725295,0.0059658606,0.000013393153,0.00010037743,0.00012204895],"about_ca_topic_score_codex":0.00007996978,"about_ca_topic_score_gemma":0.000099522666,"teacher_disagreement_score":0.033358272,"about_ca_system_score_codex":0.00011356206,"about_ca_system_score_gemma":0.00000385334,"threshold_uncertainty_score":0.30552158},"labels":[],"label_agreement":null},{"id":"W2942833824","doi":"","title":"Joint Optimal Design and Operation of Hybrid Energy Storage Systems","year":2016,"lang":"en","type":"article","venue":"EUR Research Repository (Erasmus University Rotterdam)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sizing; Energy storage; Computer science; Computer data storage; Grid; Computer hardware; Power (physics); Mathematics","score_opus":0.02977020262509768,"score_gpt":0.20909277716851044,"score_spread":0.17932257454341274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942833824","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61373055,0.00023884623,0.37933823,0.00011301029,0.0005613469,0.0003326725,0.0000073118536,0.00020160846,0.005476431],"genre_scores_gemma":[0.9940149,0.00018371273,0.0006143368,0.0000040082273,0.0001421563,0.000005598567,0.0000025210436,0.00003027521,0.005002469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981228,0.0004972131,0.00020603479,0.00031493808,0.0004892289,0.00036974408],"domain_scores_gemma":[0.99910665,0.00014128441,0.000038216138,0.00039997193,0.0001508811,0.00016298103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006121191,0.00015692381,0.0002064725,0.00044020065,0.0002318184,0.0000691528,0.0002693875,0.000049530056,0.000014308711],"category_scores_gemma":[0.000018364117,0.00014327283,0.000045262404,0.00017827442,0.00015720508,0.00037344563,0.00022164427,0.00014095353,0.000012029497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017783583,0.000063236694,0.00035859583,0.00017552041,0.00021920426,0.0010711013,0.00020980807,0.63406885,0.33713296,0.0032254402,0.022417704,0.0008797581],"study_design_scores_gemma":[0.0036476783,0.000655933,0.0026876435,0.0004487202,0.000054831005,0.00019372122,0.00059955555,0.46514642,0.44200182,0.000025465903,0.08375629,0.00078193005],"about_ca_topic_score_codex":0.00023137938,"about_ca_topic_score_gemma":0.0000032018033,"teacher_disagreement_score":0.38028437,"about_ca_system_score_codex":0.00038739468,"about_ca_system_score_gemma":0.00004681813,"threshold_uncertainty_score":0.5842497},"labels":[],"label_agreement":null},{"id":"W2943381229","doi":"10.2172/1509462","title":"U.S. National Average Electricity Grid Mix 2007","year":2012,"lang":"en","type":"report","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Electricity; Reliability engineering; Quality (philosophy); Computer science; Duration (music); Cost database; Total cost; Range (aeronautics); Electric power industry; Data quality; Operations research; Environmental economics; Power (physics); Business; Operations management; Engineering; Economics; Database","score_opus":0.027499207151158445,"score_gpt":0.23905256274496187,"score_spread":0.21155335559380342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943381229","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000119384924,0.001917048,0.009074561,0.000018124027,0.012291423,0.00015555484,0.000030664603,0.0007914093,0.97560185],"genre_scores_gemma":[0.21875218,0.023468433,0.0057049477,0.00086397154,0.084246166,0.0005994706,0.0041391486,0.0011308895,0.6610948],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976288,0.00001365058,0.00035404816,0.00023967732,0.0012832661,0.00048055215],"domain_scores_gemma":[0.99928004,0.000043436263,0.00005629269,0.0002851862,0.00022436594,0.0001106913],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00059773517,0.00034127574,0.00030849283,0.00031188194,0.000038506038,0.00003587854,0.0002291872,0.00028572787,0.0039953124],"category_scores_gemma":[0.00006969,0.0003434155,0.00014087307,0.00021978888,0.000011666745,0.00011305089,0.0000813125,0.00039380434,0.0009553425],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.2563976e-7,0.00001843165,0.00013497518,0.00012845556,0.00020655064,0.000007299203,0.0000033774163,0.064430095,0.0000071733234,0.00035299128,0.9333892,0.0013208246],"study_design_scores_gemma":[0.00007368976,0.000005213878,0.0027814459,0.000016611906,0.000036811456,0.00001904893,6.707694e-7,0.0052098134,0.00017435593,0.000033996832,0.991255,0.00039337506],"about_ca_topic_score_codex":0.00014454924,"about_ca_topic_score_gemma":0.000043351116,"teacher_disagreement_score":0.31450704,"about_ca_system_score_codex":0.001144751,"about_ca_system_score_gemma":0.0001800549,"threshold_uncertainty_score":0.9999018},"labels":[],"label_agreement":null},{"id":"W2947316945","doi":"10.22215/etd/2016-11479","title":"The Value of Demand Response in a Hydro-Dominated Power Grid - The Example of Quebec, Canada","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; HEC Montréal","funders":"","keywords":"Demand response; Revenue; Arbitrage; Electricity; Service (business); Business; Environmental economics; Value (mathematics); Grid; Control (management); Yield (engineering); Economics; Agricultural economics; Engineering; Finance; Marketing; Geography; Computer science; Electrical engineering","score_opus":0.003762793371101835,"score_gpt":0.18860792233549065,"score_spread":0.18484512896438882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947316945","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98298806,0.00042299015,0.00006207683,0.00015676978,0.0015212101,0.00028768607,0.000013631088,0.00002917982,0.014518386],"genre_scores_gemma":[0.9808061,0.00009283729,0.000011602687,0.000016043232,0.000029997074,0.000053099913,0.00004068445,0.000043205375,0.01890639],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99879396,0.00012753888,0.00043059594,0.0001419596,0.0002921304,0.00021381407],"domain_scores_gemma":[0.99861676,0.0007026854,0.00010390886,0.0004987938,0.00005217507,0.000025707235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005848576,0.00019117228,0.0002454637,0.00010231602,0.00003829928,0.000010248333,0.00036955575,0.00008982882,0.0000880114],"category_scores_gemma":[0.00011675426,0.000102809885,0.00005301283,0.00019270185,0.000028445402,0.000032449498,0.000026894722,0.0001238339,0.0000019569281],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0064655202,0.00013038452,0.0011354318,0.0012510831,0.0023560366,0.00009223915,0.0057136854,0.58043796,0.038328364,0.024858983,0.33583727,0.0033930445],"study_design_scores_gemma":[0.002538539,0.00012804508,0.4616779,0.0011091206,0.00021478509,0.0000026565167,0.0046228734,0.016757589,0.1578096,0.00045787307,0.3533725,0.0013084854],"about_ca_topic_score_codex":0.83676577,"about_ca_topic_score_gemma":0.9854276,"teacher_disagreement_score":0.56368035,"about_ca_system_score_codex":0.00021531625,"about_ca_system_score_gemma":0.00022725448,"threshold_uncertainty_score":0.41924655},"labels":[],"label_agreement":null},{"id":"W2947947931","doi":"10.11575/prism/35917","title":"Pre-feasibility Study Of District Energy In The West Campus Development","year":2014,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Environmental planning; Geography; Statistics","score_opus":0.008165567226426529,"score_gpt":0.17462438313382164,"score_spread":0.1664588159073951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947947931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.858136,0.000023504479,0.1350487,0.000018059833,0.00007705994,0.00014231952,8.6899e-8,0.00003671487,0.0065175327],"genre_scores_gemma":[0.9979604,0.000010574988,0.0018836176,0.0000065206405,0.000005468235,0.0000010565695,0.0000041782987,0.000006707591,0.00012149611],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99926627,0.000083563704,0.0001434961,0.00014422939,0.00022626798,0.00013618174],"domain_scores_gemma":[0.999506,0.000057636473,0.000048009584,0.00033826721,0.000018591596,0.000031524378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000270994,0.00009674794,0.00017218865,0.0001075932,0.000045072124,0.000003771082,0.00038588344,0.000038527884,0.00002465743],"category_scores_gemma":[0.000012030746,0.000096470794,0.000034116318,0.00020681422,0.000038138875,0.00006854097,0.0001178104,0.000079137484,0.0000025690745],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002065828,0.0035777756,0.39676127,0.00046196612,0.000573009,0.000087193446,0.048654325,0.031605676,0.00037700954,0.0059650256,0.003845032,0.50788516],"study_design_scores_gemma":[0.00075537653,0.00008578445,0.94328815,0.000010789189,0.000025293535,3.7198208e-7,0.00053310394,0.045929417,0.00009119537,0.00004796642,0.009114959,0.00011757485],"about_ca_topic_score_codex":0.001566357,"about_ca_topic_score_gemma":0.00086108653,"teacher_disagreement_score":0.5465269,"about_ca_system_score_codex":0.00008542767,"about_ca_system_score_gemma":0.000012333069,"threshold_uncertainty_score":0.3933965},"labels":[],"label_agreement":null},{"id":"W2949253721","doi":"10.48550/arxiv.1112.1370","title":"Comfort-constrained distributed heat pump management","year":2011,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Dispatchable generation; Thermostat; Demand response; Computer science; Wind power; Process (computing); Controller (irrigation); Peaking power plant; Component (thermodynamics); Load management; Power (physics); Aggregate (composite); Control (management); Distributed generation; Control engineering; Engineering; Mechanical engineering; Renewable energy; Electricity; Electrical engineering","score_opus":0.04446143343160383,"score_gpt":0.1510098718359841,"score_spread":0.10654843840438027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949253721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33764517,0.000115474824,0.45250285,0.000034447046,0.0034968357,0.001002572,0.00023370194,0.0026816847,0.20228727],"genre_scores_gemma":[0.9968238,0.00052676233,0.00026750244,0.00003482362,0.00010779317,0.0000063358025,0.0003684084,0.000076532386,0.0017880835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982451,0.000042085114,0.00027536787,0.0007821511,0.000098418095,0.00055684365],"domain_scores_gemma":[0.998453,0.000022146474,0.000058402547,0.0012127903,0.000042468415,0.0002111583],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001332678,0.00053334783,0.0004259684,0.00033023462,0.000091028174,0.000053798893,0.0009021235,0.00028819568,0.00033050068],"category_scores_gemma":[0.0000035834946,0.000681232,0.0002583004,0.00039287755,0.00011874211,0.00012886195,0.0011378113,0.0005045716,0.00020188789],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018999528,0.000051183724,0.00058618333,0.0002501272,0.0007003877,0.0006054362,0.000033670727,0.9152823,0.0000072085304,0.07998487,0.002347533,0.0001320944],"study_design_scores_gemma":[0.0019047806,0.000055244298,0.005793422,0.00035278653,0.0010562234,0.000008220673,0.00034560048,0.93788344,0.0004999782,0.020631682,0.02924772,0.002220927],"about_ca_topic_score_codex":0.000111211186,"about_ca_topic_score_gemma":0.000051249823,"teacher_disagreement_score":0.65917856,"about_ca_system_score_codex":0.00046499338,"about_ca_system_score_gemma":0.000019391955,"threshold_uncertainty_score":0.9995639},"labels":[],"label_agreement":null},{"id":"W2949294780","doi":"10.48550/arxiv.1601.05678","title":"Achieving an optimal trade-off between revenue and energy peak within a smart grid environment","year":2016,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Revenue; Smart grid; Schedule; Monopolistic competition; Grid; Set (abstract data type); Computer science; Mathematical optimization; Constraint (computer-aided design); Task (project management); Microeconomics; Operations research; Trade-off; Economics; Mathematics; Engineering; Finance","score_opus":0.030418273034504756,"score_gpt":0.15103934625275942,"score_spread":0.12062107321825466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949294780","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91677636,0.00030462389,0.07866917,0.000080897255,0.00096703554,0.00016948674,0.00019701458,0.000375313,0.002460122],"genre_scores_gemma":[0.996426,0.0010608588,0.00043130762,0.000026293897,0.00061359874,0.000004000819,0.00008767493,0.000096545875,0.0012537396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817276,0.00011782306,0.00026920682,0.0008905867,0.00011392141,0.00043570407],"domain_scores_gemma":[0.9986267,0.0000563395,0.00012251528,0.0009057125,0.000008744821,0.0002799995],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022535624,0.00049021613,0.00043981886,0.00025252393,0.00011766542,0.00005814762,0.0005745499,0.00031159338,0.00005077329],"category_scores_gemma":[0.0000069081066,0.0005543897,0.00012999907,0.00011369018,0.00012108923,0.0002584561,0.00084974064,0.00042756269,0.000022143466],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023704955,0.00003109457,0.005446533,0.00011543028,0.00035667722,0.00018227517,0.0001861082,0.9874281,0.00014453018,0.0031771974,0.000786673,0.0021216713],"study_design_scores_gemma":[0.003765188,0.00050752365,0.13029909,0.0013384452,0.0020180836,0.000030078305,0.00050445023,0.6070652,0.0016286445,0.004949467,0.24195126,0.0059425794],"about_ca_topic_score_codex":0.0000717219,"about_ca_topic_score_gemma":0.00004924492,"teacher_disagreement_score":0.38036293,"about_ca_system_score_codex":0.0003608116,"about_ca_system_score_gemma":0.000023473367,"threshold_uncertainty_score":0.9996908},"labels":[],"label_agreement":null},{"id":"W2949587434","doi":"10.1145/3307772.3331032","title":"Adaptive Battery Control with Neural Networks","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controller (irrigation); Computer science; Battery (electricity); Model predictive control; Context (archaeology); Artificial neural network; Control (management); Adaptive control; Control engineering; Engineering; Power (physics); Artificial intelligence","score_opus":0.0030914774960631355,"score_gpt":0.14044287207262957,"score_spread":0.13735139457656642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949587434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24249102,0.0000903453,0.6067334,0.00015823281,0.0013252194,0.0003345595,0.0000010405147,0.0008704296,0.14799577],"genre_scores_gemma":[0.9980507,0.000002284655,0.00029569655,0.0004126431,0.0001259199,0.000015259448,0.0000018498611,0.000026070968,0.0010695944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955374,0.0000069721814,0.000069009446,0.000102136735,0.000078842684,0.00018932528],"domain_scores_gemma":[0.99974823,0.00002592218,0.0000071340396,0.00017418317,0.000009474666,0.000035065845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003053419,0.000099793164,0.00010036244,0.000029910756,0.00000963126,0.000016843565,0.00007542341,0.000023796092,0.00035126897],"category_scores_gemma":[4.6001963e-7,0.00007665126,0.000019819956,0.00006816735,0.000007977704,0.00008604203,0.000014016372,0.00007430048,0.00013235406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013200195,0.0000027869671,0.0033633227,0.0000035796536,0.00005969683,0.0000047108115,0.0000065766035,0.9918711,0.000016248065,0.0005312769,0.0035996577,0.00052782416],"study_design_scores_gemma":[0.0005171604,0.000051969495,0.008412449,0.0000047289755,0.000010166079,0.000001915361,0.000024227435,0.9887847,0.000031454696,0.0000034419584,0.0020366707,0.00012112513],"about_ca_topic_score_codex":0.000010298282,"about_ca_topic_score_gemma":0.000016169197,"teacher_disagreement_score":0.7555597,"about_ca_system_score_codex":0.000023903645,"about_ca_system_score_gemma":0.0000012073166,"threshold_uncertainty_score":0.38461488},"labels":[],"label_agreement":null},{"id":"W2950399521","doi":"","title":"SDP Relaxation with Randomized Rounding for Energy Disaggregation","year":2016,"lang":"en","type":"preprint","venue":"Spiral (Imperial College London)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Rounding; Randomized rounding; Semidefinite programming; Scalability; Relaxation (psychology); Computer science; Mathematical optimization; Inference; Quadratic programming; Energy consumption; Energy (signal processing); Integer programming; Integer (computer science); Quadratic equation; Task (project management); Algorithm; Linear programming; Mathematics; Artificial intelligence; Statistics","score_opus":0.008976687618679407,"score_gpt":0.20824205532135964,"score_spread":0.19926536770268025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950399521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22085808,0.0013979063,0.6870362,0.0009793896,0.032301664,0.00763459,0.00075199024,0.002878442,0.046161726],"genre_scores_gemma":[0.9845386,0.0002540687,0.003614551,0.000083584535,0.0044890833,0.0036298772,0.0005108336,0.0002637854,0.0026155724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"randomized_trial","domain_scores_codex":[0.99735904,0.00014164943,0.0007837684,0.00067666936,0.00045135344,0.0005875475],"domain_scores_gemma":[0.9984283,0.0002933692,0.00033063555,0.0006684989,0.00014645467,0.00013274707],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00059710775,0.000677565,0.0011343264,0.000324015,0.00017174342,0.00017945387,0.0004007758,0.00043537188,0.00007593783],"category_scores_gemma":[0.00018152832,0.00052968593,0.00039585677,0.00021092001,0.00011489732,0.00030068707,0.00024887215,0.00023704422,0.000016823125],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.096041515,0.00014045625,0.00012437446,0.0019530804,0.0033950505,0.00006620573,0.0005160904,0.3261689,0.004491129,0.52404076,0.03451522,0.008547239],"study_design_scores_gemma":[0.4563387,0.00080139755,0.00013153185,0.0031900653,0.0019496266,0.000026983545,0.00013763878,0.23442803,0.024450572,0.0806653,0.19208874,0.0057914043],"about_ca_topic_score_codex":0.00008430452,"about_ca_topic_score_gemma":0.00015314504,"teacher_disagreement_score":0.7636806,"about_ca_system_score_codex":0.0006717222,"about_ca_system_score_gemma":0.00009788875,"threshold_uncertainty_score":0.99971545},"labels":[],"label_agreement":null},{"id":"W2950431277","doi":"10.1109/tsg.2018.2865702","title":"Residential Household Non-Intrusive Load Monitoring via Graph-Based Multi-Label Semi-Supervised Learning","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Computer science; Graph; Machine learning; Artificial intelligence; Theoretical computer science","score_opus":0.021403791138038267,"score_gpt":0.23024522277712753,"score_spread":0.20884143163908925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950431277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18758868,0.00003279457,0.7993628,0.000057015328,0.01086583,0.00030464606,0.00002153276,0.0012604562,0.0005062495],"genre_scores_gemma":[0.9913226,0.00007419591,0.006134241,0.000074897,0.001450991,0.00017374603,0.00000731,0.00018458358,0.0005774646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976619,0.0000704819,0.00045932663,0.00054014445,0.0005811257,0.0006870292],"domain_scores_gemma":[0.9988747,0.00009082616,0.00005808023,0.0006100392,0.00014515815,0.00022119064],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023999014,0.00047702203,0.0003445895,0.00047416473,0.00051701604,0.00011325971,0.000348606,0.00020154357,0.00015276384],"category_scores_gemma":[0.000007568365,0.00049750775,0.00020939147,0.0006813491,0.00012835901,0.00031239723,0.0000049768723,0.00067321287,0.00038067283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009297289,0.00017441412,0.0003958817,0.000068841204,0.00024210317,0.000031237458,0.00029457375,0.95434487,0.03663585,9.104571e-7,0.0013103189,0.0064080157],"study_design_scores_gemma":[0.002799996,0.00026931555,0.0017388655,0.00016397653,0.00016619172,0.0000067610526,0.000103437415,0.60497147,0.38525355,0.000004837571,0.0037723104,0.00074927596],"about_ca_topic_score_codex":0.0003555054,"about_ca_topic_score_gemma":0.00027847436,"teacher_disagreement_score":0.8037339,"about_ca_system_score_codex":0.00037400503,"about_ca_system_score_gemma":0.000049349263,"threshold_uncertainty_score":0.99974763},"labels":[],"label_agreement":null},{"id":"W2951766939","doi":"10.1145/3307772.3328279","title":"EnergyBoost","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science","score_opus":0.0014291011925727664,"score_gpt":0.12578865276529858,"score_spread":0.12435955157272581,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2951766939","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16571434,0.000026928124,0.0029776616,0.000025529418,0.0007652281,0.000025928777,1.3001167e-7,0.00046447918,0.8299998],"genre_scores_gemma":[0.98269904,0.000009978127,0.00047861165,0.0001019102,0.000053725358,0.000003777456,0.0000016288969,0.000013065786,0.016638245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99976856,0.0000013575996,0.000042400054,0.00004978428,0.00004943957,0.00008848841],"domain_scores_gemma":[0.9998343,0.000005093969,0.0000017288888,0.0001376873,0.0000030735875,0.000018103858],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000018247716,0.000042305106,0.000037077563,0.000027337986,0.000004042252,0.00000778652,0.00005604573,0.000013201491,0.0015679215],"category_scores_gemma":[6.3430303e-7,0.000038994,0.0000138765945,0.00004932319,0.0000019560196,0.00003888934,0.000016304984,0.000019936988,0.0023067575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.276837e-7,0.0000037321413,0.0019161738,0.000015063737,0.000026567823,0.0000016263601,0.000012054326,0.90677005,0.0025120184,0.044429656,0.041846003,0.0024665382],"study_design_scores_gemma":[0.00014941767,0.00000840964,0.0051612654,0.0000032964128,0.0000024710941,8.039469e-7,0.000017910479,0.13159466,0.009026582,0.00010803561,0.8537841,0.00014303823],"about_ca_topic_score_codex":0.000005821881,"about_ca_topic_score_gemma":0.0000052227824,"teacher_disagreement_score":0.8169847,"about_ca_system_score_codex":0.000015622263,"about_ca_system_score_gemma":7.888051e-7,"threshold_uncertainty_score":0.99934477},"labels":[],"label_agreement":null},{"id":"W2952132193","doi":"10.1109/tsg.2016.2550500","title":"Real-Time Residential-Side Joint Energy Storage Management and Load Scheduling With Renewable Integration","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Lyapunov optimization; Scheduling (production processes); Energy storage; Dynamic priority scheduling; Renewable energy; Fair-share scheduling; Time horizon; Demand response; Model predictive control; Load management","score_opus":0.008173285689012088,"score_gpt":0.1841978207906166,"score_spread":0.1760245351016045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952132193","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044745814,0.000041749317,0.94084233,0.00022791204,0.0012156593,0.00020094303,0.000016458434,0.00068530923,0.012023822],"genre_scores_gemma":[0.97453153,0.0017101262,0.009900625,0.0000623357,0.00025564537,0.00021828375,0.0000074432282,0.0001251141,0.0131889125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998409,0.00004772362,0.00033087653,0.00042626561,0.0004074071,0.00037875996],"domain_scores_gemma":[0.9992019,0.000049810333,0.000047789166,0.0005038217,0.000058784703,0.00013790345],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021349161,0.00031796866,0.00025019335,0.0003364098,0.00017497677,0.00008054419,0.00012974541,0.00008635401,0.0001401237],"category_scores_gemma":[0.0000020386676,0.0002462314,0.00007125218,0.00028711668,0.000063682346,0.00036315114,0.00000468689,0.00011095545,0.00009372919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013545783,0.00007613587,0.000008906987,0.00007120459,0.00038195195,0.000065629356,0.00009558151,0.91748184,0.06319005,0.00039130132,0.0047154664,0.013386471],"study_design_scores_gemma":[0.005409184,0.0006967921,0.0024621084,0.0016789425,0.0006840507,0.000081146405,0.00029456778,0.12173227,0.82523644,0.0004960024,0.039025594,0.0022029264],"about_ca_topic_score_codex":0.0006690173,"about_ca_topic_score_gemma":0.0011551933,"teacher_disagreement_score":0.9309417,"about_ca_system_score_codex":0.00039595974,"about_ca_system_score_gemma":0.000021582353,"threshold_uncertainty_score":0.999999},"labels":[],"label_agreement":null},{"id":"W2952263936","doi":"10.1109/icps.2019.8733383","title":"Stochastic Multi-objective Economic/Emission Energy Management of a Microgrid in Presence of Combined Heat and Power Systems","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Microgrid; Energy management; Power (physics); Energy (signal processing); Computer science; Electric power system; Reliability engineering; Environmental science; Engineering; Mathematics; Physics; Thermodynamics","score_opus":0.004715486669662024,"score_gpt":0.18686695708394632,"score_spread":0.1821514704142843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952263936","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9735941,0.0006485488,0.018087966,0.000009637495,0.0007294851,0.00042974704,0.0000054667194,0.00006578615,0.0064292536],"genre_scores_gemma":[0.9987252,0.00008824236,0.00042341393,0.0000031871682,0.0000044827243,0.000028127843,0.0000027310364,0.00001913728,0.00070551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992733,0.000016814778,0.00028946105,0.00018428564,0.00007894367,0.00015721451],"domain_scores_gemma":[0.9996372,0.000040918774,0.000030603245,0.00024040624,0.000013300155,0.000037594964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000096354575,0.00012931417,0.0002505119,0.00014865889,0.000005914063,0.000008021161,0.00011127828,0.00004031627,0.000031716925],"category_scores_gemma":[0.0000016820069,0.00012511507,0.000026395335,0.0000789714,0.000021152071,0.00007357421,0.000118828735,0.000037378584,0.000004545168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033296976,0.000047989983,0.0021830704,0.0003574158,0.0001230597,0.000002463984,0.00012610653,0.98725533,0.0049925693,0.004520702,0.00020399665,0.0001539848],"study_design_scores_gemma":[0.0020021533,0.00012049522,0.017524598,0.00042583892,0.000020536385,0.0000018285023,0.00088832836,0.9695355,0.0087892655,0.000015923444,0.00043658252,0.00023894584],"about_ca_topic_score_codex":0.0006425275,"about_ca_topic_score_gemma":0.000043069547,"teacher_disagreement_score":0.02513106,"about_ca_system_score_codex":0.00008690667,"about_ca_system_score_gemma":0.000004221763,"threshold_uncertainty_score":0.51020443},"labels":[],"label_agreement":null},{"id":"W2952829024","doi":"10.17159/2413-3051/2019/v30i2a6375","title":"Alternatives for small, medium and micro scale enterprises participation in the renewable energy industry – small scale embedded generation review","year":2019,"lang":"en","type":"article","venue":"Journal of Energy in Southern Africa","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Society of Intestinal Research","funders":"","keywords":"Renewable energy; Procurement; Scale (ratio); Business; Electricity generation; Environmental economics; Electricity; Photovoltaic system; Solar energy; Renewable resource; Solar power; Natural resource economics; Economics; Power (physics); Engineering; Electrical engineering; Marketing; Geography","score_opus":0.02410192090593133,"score_gpt":0.24299698428196745,"score_spread":0.21889506337603612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952829024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97321284,0.011415568,0.011200238,0.0005531305,0.00078401604,0.00021558175,0.000011829508,0.000026581652,0.0025802273],"genre_scores_gemma":[0.9933524,0.0033753451,0.001496021,0.00038868462,0.00046326825,0.00008698507,0.000011345179,0.00004131543,0.0007846501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986313,0.00014700195,0.00060125784,0.0001596391,0.00020056177,0.00026021292],"domain_scores_gemma":[0.9993121,0.00013746326,0.00020955855,0.0002101625,0.00007133766,0.00005939163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067112903,0.00017995916,0.00032459298,0.00019382949,0.000028208975,0.000049371436,0.0002829454,0.000120956065,0.00003100676],"category_scores_gemma":[0.000048985105,0.00013734683,0.000081353035,0.00023968185,0.00002479545,0.00013248189,0.00004056856,0.00018187691,0.0000015518324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013219865,0.0003775849,0.02516909,0.00055820734,0.0002382637,0.000029848761,0.009735651,0.9115296,0.037132844,0.00015299178,0.009544982,0.0053987447],"study_design_scores_gemma":[0.015969947,0.002007192,0.02573956,0.011870252,0.0010670887,0.00024331172,0.020328823,0.23196574,0.1267745,0.0038077193,0.5564995,0.0037263925],"about_ca_topic_score_codex":0.0001412691,"about_ca_topic_score_gemma":0.001740311,"teacher_disagreement_score":0.6795639,"about_ca_system_score_codex":0.00008835481,"about_ca_system_score_gemma":0.000024691919,"threshold_uncertainty_score":0.56008404},"labels":[],"label_agreement":null},{"id":"W2953122584","doi":"10.48550/arxiv.1506.04799","title":"Power Systems Without Fuel","year":2015,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Renewable energy; Fossil fuel; Electric power system; Wind power; Energy source; Environmental economics; Electricity generation; Power (physics); Fuel cells; Computer science; Automotive engineering; Environmental science; Engineering; Electrical engineering; Economics; Waste management","score_opus":0.05018123947120218,"score_gpt":0.15998100782406055,"score_spread":0.10979976835285837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953122584","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5188784,0.0011243955,0.13654765,0.000020880683,0.010832769,0.0007081249,0.000052481093,0.0025420676,0.3292932],"genre_scores_gemma":[0.9933683,0.00019573393,0.000057716476,0.00001471676,0.00014364377,0.0000025050472,0.000032370255,0.00008171782,0.0061032395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870414,0.00005187958,0.000186845,0.0005778663,0.00010716359,0.00037213333],"domain_scores_gemma":[0.99855846,0.000018647926,0.000074519434,0.0010254291,0.00010954463,0.00021336788],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019630187,0.0003881071,0.00038502226,0.00026456182,0.00003451699,0.00007661213,0.00066793815,0.00030458183,0.000067028064],"category_scores_gemma":[0.0000113413935,0.0004755637,0.00013126309,0.00026044901,0.000051348074,0.00013385549,0.0007098342,0.00047159937,0.00041885447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000094824345,0.000016796743,0.0015742475,0.00022740269,0.00023765532,0.00017254987,0.00007276546,0.9740926,0.0000050166914,0.01265609,0.010930303,0.0000050777535],"study_design_scores_gemma":[0.00055976136,0.000025118892,0.0007746155,0.00016063916,0.00015868133,0.000004181734,0.0002559494,0.9389224,0.00001214846,0.0024816473,0.055798717,0.0008461562],"about_ca_topic_score_codex":0.00011365467,"about_ca_topic_score_gemma":0.000025241448,"teacher_disagreement_score":0.47448993,"about_ca_system_score_codex":0.00056301826,"about_ca_system_score_gemma":0.000050446124,"threshold_uncertainty_score":0.9997696},"labels":[],"label_agreement":null},{"id":"W2953430238","doi":"10.4018/978-1-5225-8559-6.ch010","title":"Economically Optimal Solar Power Generation","year":2019,"lang":"en","type":"book-chapter","venue":"Practice, progress, and proficiency in sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Agriculture Environmental Renewal Canada (Canada); University of Ottawa","funders":"","keywords":"Electricity; Profitability index; Grid parity; Renewable energy; Stand-alone power system; Environmental economics; Electricity retailing; Installation; Consumption (sociology); Electricity generation; Business; Solar power; Photovoltaic system; Electrical engineering; Engineering; Economics; Power (physics); Finance; Electricity market; Distributed generation; Mechanical engineering","score_opus":0.008749815129982377,"score_gpt":0.2360132433738827,"score_spread":0.2272634282439003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953430238","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05908226,0.016105121,0.002384375,0.0029861515,0.003206964,0.006245193,0.000045039,0.0007222493,0.90922266],"genre_scores_gemma":[0.94247395,0.0021317063,0.003971931,0.0002545623,0.000679818,0.00042488577,0.00016711249,0.0002993525,0.049596697],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99772733,0.00006618056,0.0006520431,0.0007540014,0.0002813031,0.0005191105],"domain_scores_gemma":[0.9985938,0.00014552624,0.00019323925,0.0006864459,0.00028425493,0.00009672549],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013002828,0.00047459448,0.00046087123,0.00022479917,0.00009121036,0.00018909165,0.0002600663,0.00040548807,0.00018491707],"category_scores_gemma":[0.0002743129,0.0005023469,0.00009075305,0.000064260836,0.00025456984,0.00078401953,0.00019681084,0.00068441196,0.000046121128],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004449472,0.0006629443,0.022321235,0.0042489655,0.0005565975,0.0003474669,0.002690915,0.15446158,0.0000150228925,0.7399061,0.006662912,0.06768137],"study_design_scores_gemma":[0.00056267413,0.0002952198,0.0026756425,0.000053514414,0.00012277983,0.000018730409,0.0003407119,0.035196267,0.000031875752,0.004766247,0.9548681,0.0010682484],"about_ca_topic_score_codex":0.00001843078,"about_ca_topic_score_gemma":0.00001635524,"teacher_disagreement_score":0.9482052,"about_ca_system_score_codex":0.0008027858,"about_ca_system_score_gemma":0.00026784526,"threshold_uncertainty_score":0.9997428},"labels":[],"label_agreement":null},{"id":"W2954802233","doi":"10.1109/isgt.2019.8791595","title":"Smart Households Demand Response Management with Micro Grid","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Demand response; Smart grid; Schedule; Photovoltaic system; Incentive; Computer science; Load management; Peak demand; Grid; Electricity; Energy management; Environmental economics; Energy management system; Operations research; Energy (signal processing); Engineering; Economics; Microeconomics; Electrical engineering","score_opus":0.008703546745098647,"score_gpt":0.18753385460524868,"score_spread":0.17883030786015003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954802233","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5608381,0.00092481927,0.16801271,0.00053967367,0.009946251,0.0024951014,0.00006601821,0.004553253,0.25262406],"genre_scores_gemma":[0.9103161,0.0010408608,0.036732674,0.0006042391,0.0007091357,0.0006304054,0.00019329537,0.0005988637,0.04917441],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997929,0.00007167825,0.00037196494,0.0006774319,0.0004103605,0.0005396013],"domain_scores_gemma":[0.99811536,0.000057144436,0.000060194816,0.0016167951,0.00003206571,0.00011843219],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004812646,0.0006102223,0.00046536216,0.0003007033,0.000042467567,0.00015731537,0.00062801776,0.00024530865,0.00019335585],"category_scores_gemma":[0.000003741676,0.00054405996,0.00012858798,0.00017541113,0.000037765603,0.00007557323,0.0010416356,0.00047279464,0.0004708414],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020937705,0.00002789072,0.00095067784,0.00073400454,0.0007680759,0.00012850515,0.000053406377,0.89932156,0.0000940862,0.00020779987,0.09727123,0.00023337832],"study_design_scores_gemma":[0.0023328674,0.00017730048,0.0752531,0.0008829329,0.00059964263,0.000029044604,0.00017607598,0.04597636,0.005441926,0.0001619859,0.86617976,0.0027889947],"about_ca_topic_score_codex":0.00003496813,"about_ca_topic_score_gemma":0.000035364606,"teacher_disagreement_score":0.8533452,"about_ca_system_score_codex":0.0003094875,"about_ca_system_score_gemma":0.00002381825,"threshold_uncertainty_score":0.9997011},"labels":[],"label_agreement":null},{"id":"W2956001012","doi":"10.29173/mocs115","title":"Toward Community Generation: Energy Simulation and Performance Evaluation of Multi-family Solar PV Settings for Energy-efficient Homes in Edmonton, Canada","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Environmental science; Greenhouse gas; Solar energy; Grid; Distributed generation; Meteorology; Engineering; Electrical engineering; Economics; Geography","score_opus":0.02351932681421245,"score_gpt":0.21375214208538668,"score_spread":0.19023281527117422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956001012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9796128,0.00062715943,0.018712344,0.00003600615,0.00039880612,0.00029389843,0.000009367755,0.00005239334,0.00025722058],"genre_scores_gemma":[0.99739635,0.00020402124,0.002081387,0.000053879656,0.00008181218,0.00006340377,0.000059252012,0.000026902,0.000032972766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987599,0.000029398365,0.0003799504,0.00025371183,0.00035456434,0.00022247243],"domain_scores_gemma":[0.9992855,0.00003324255,0.00011344788,0.00012404058,0.00038289692,0.000060871735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058617553,0.00021103857,0.00025992232,0.00022444158,0.00014148881,0.000054382792,0.00008862491,0.00010036612,0.0000064668775],"category_scores_gemma":[0.000024052068,0.00023639135,0.00003193702,0.0002322039,0.000052358235,0.000292583,0.000053188523,0.00011705498,1.7406751e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002273705,0.000019721405,0.014304858,0.0002692595,0.000044826356,1.3525393e-7,0.0003080802,0.91521823,0.0041116783,0.0004594843,0.00013009545,0.0651109],"study_design_scores_gemma":[0.0012515576,0.000048910515,0.023701295,0.00006503563,0.0000501243,0.0000022893155,0.0006743422,0.96313393,0.0064396886,0.000019852632,0.004379606,0.00023338757],"about_ca_topic_score_codex":0.0080417255,"about_ca_topic_score_gemma":0.008183659,"teacher_disagreement_score":0.06487751,"about_ca_system_score_codex":0.00024920286,"about_ca_system_score_gemma":0.000054923854,"threshold_uncertainty_score":0.9985638},"labels":[],"label_agreement":null},{"id":"W2956259548","doi":"10.18280/mmep.020101","title":"THE PROPORTION OF ENERGY CONSUMPTION STRUCTURE PREDICTION BASED ON MARKOV CHAIN","year":2015,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Markov chain; Energy consumption; Consumption (sociology); Markov model; Computer science; Econometrics; Mathematics; Statistics; Engineering; Sociology","score_opus":0.018107409333400867,"score_gpt":0.1810876993335276,"score_spread":0.16298029000012676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956259548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04379545,0.00016896486,0.9550285,0.00003564439,0.00021872339,0.00011703206,0.000004063181,0.00025101125,0.00038062825],"genre_scores_gemma":[0.9928456,0.00006096701,0.0069229584,0.0000048951633,0.000052915333,0.000038345832,0.0000099678455,0.000031891952,0.000032487522],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918246,0.0000105049885,0.00026401307,0.00011918104,0.0002493316,0.00017448484],"domain_scores_gemma":[0.9996159,0.00006261983,0.000029325898,0.00018246393,0.00003305639,0.000076608434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027287815,0.00014129851,0.00013607109,0.00007151779,0.00003628992,0.000029872679,0.000066124965,0.00006877894,0.0000036501892],"category_scores_gemma":[0.000022444296,0.00010485323,0.000025733218,0.00007878875,0.000025326532,0.000045066092,0.000013773649,0.00010162175,0.0000013949148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060446173,0.000011018599,0.000018745865,0.00032101764,0.000018606594,3.4454163e-7,0.000054805118,0.9877638,0.00015942102,0.01091,0.00006476521,0.00067142874],"study_design_scores_gemma":[0.00018906596,0.000044999648,0.00002185131,0.00015497983,0.000015845735,0.0000021032156,0.0000057397438,0.99479806,0.0007580885,0.0032427844,0.0006673767,0.000099107885],"about_ca_topic_score_codex":0.000002005511,"about_ca_topic_score_gemma":4.611804e-7,"teacher_disagreement_score":0.9490501,"about_ca_system_score_codex":0.00004397696,"about_ca_system_score_gemma":0.0000049787095,"threshold_uncertainty_score":0.42757908},"labels":[],"label_agreement":null},{"id":"W2957966199","doi":"10.1109/appeec45492.2019.8994618","title":"Universal Non-Intrusive Load Monitoring (UNILM) Using Filter Pipelines, Probabilistic Knapsack, and Labelled Partition Maps","year":2019,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Partition (number theory); Knapsack problem; Probabilistic logic; Computer science; Energy consumption; Pipeline (software); Pipeline transport; Filter (signal processing); Real-time computing; Aggregate (composite); Energy (signal processing); Gaussian; Data mining; Engineering; Artificial intelligence; Algorithm; Statistics; Mathematics; Computer vision","score_opus":0.01845213181090136,"score_gpt":0.21731612604694045,"score_spread":0.1988639942360391,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2957966199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8661693,0.00064948,0.10374295,0.00011761318,0.009645792,0.0016426996,0.00005867072,0.0010125025,0.016961033],"genre_scores_gemma":[0.9880199,0.00036242494,0.008589751,0.000022750122,0.0010106927,0.00005400681,0.00010858167,0.00013482507,0.0016971024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982824,0.000036272475,0.0003636747,0.00057298975,0.00031911198,0.00042559637],"domain_scores_gemma":[0.9989464,0.00005913973,0.00008673345,0.0006465976,0.0001455869,0.00011551824],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018559076,0.0004807701,0.0004579097,0.00020476221,0.000067472094,0.00013923919,0.00024738107,0.00030309675,0.00010622993],"category_scores_gemma":[0.00002885357,0.00052055635,0.000089258945,0.00015024478,0.000046543555,0.00017215137,0.00078626577,0.00047443938,0.000079839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000136553745,0.000017831784,0.0010033081,0.00079239946,0.00018085424,0.000021693068,0.00019228604,0.99458736,0.0008322891,0.00020037587,0.0017630524,0.00039491232],"study_design_scores_gemma":[0.00080353534,0.000024847022,0.0010676947,0.000612666,0.00023963343,0.000006070295,0.00028027743,0.9898186,0.0016836339,0.00064992084,0.003959245,0.00085388287],"about_ca_topic_score_codex":0.00032138903,"about_ca_topic_score_gemma":0.000044654567,"teacher_disagreement_score":0.1218506,"about_ca_system_score_codex":0.0007156809,"about_ca_system_score_gemma":0.00007562011,"threshold_uncertainty_score":0.9997246},"labels":[],"label_agreement":null},{"id":"W2959590757","doi":"10.18280/ejee.210112","title":"A Blockchain-based Spot Market Transaction Model for Energy Power Supply and Demand Network","year":2019,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blockchain; Database transaction; Spot market; Spot contract; Power market; Hot spot (computer programming); Business; Supply and demand; Power (physics); Industrial organization; Commerce; Economics; Computer science; Computer security; Microeconomics; Computer network; Electric power system; Database; Electricity; Electrical engineering; Engineering; Finance; Futures contract","score_opus":0.0036110909877957228,"score_gpt":0.1534590561011056,"score_spread":0.1498479651133099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959590757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08524342,0.00079607294,0.9124418,0.000044552915,0.00040665976,0.00007946627,0.000001282992,0.000086501546,0.0009002782],"genre_scores_gemma":[0.9908596,0.000053143205,0.008510812,0.00006399878,0.0002559421,0.0000026446976,7.867447e-7,0.00009118619,0.00016185889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989621,0.00003450719,0.000363552,0.00012565323,0.00016519312,0.00034896343],"domain_scores_gemma":[0.99953055,0.00011882791,0.00005616829,0.00011424518,0.000040470422,0.00013974181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051455275,0.00019063638,0.000244594,0.00019624575,0.000024550203,0.00003141941,0.00013634525,0.000031787138,0.000025075033],"category_scores_gemma":[0.000022609196,0.00018816808,0.00011554703,0.0002043463,0.0000056107447,0.00004481436,0.00000881061,0.00020277128,0.0000015688097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007002473,0.000011300218,0.000026876536,0.000036375488,0.00008417483,0.000020704181,0.000020956359,0.99290955,0.0030849741,0.0001911319,0.0015769347,0.001966973],"study_design_scores_gemma":[0.00094170857,0.00021045482,0.0004676504,0.000059699094,0.000039520288,0.000028861377,0.0000014279409,0.9878822,0.00065412134,0.000013097682,0.009501568,0.00019971289],"about_ca_topic_score_codex":2.6565064e-7,"about_ca_topic_score_gemma":2.3732815e-7,"teacher_disagreement_score":0.9056162,"about_ca_system_score_codex":0.00007035727,"about_ca_system_score_gemma":0.0000117163545,"threshold_uncertainty_score":0.76732713},"labels":[],"label_agreement":null},{"id":"W2961459624","doi":"10.11575/prism/36448","title":"Optimal Energy Management of a SAGD Microgrid Participating in a Volatile Electricity Market","year":2019,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Microgrid; Electricity; Electricity market; Energy management; Energy market; Petroleum engineering; Business; Environmental economics; Energy (signal processing); Waste management; Engineering; Renewable energy; Economics; Electrical engineering; Mathematics","score_opus":0.013542839950893708,"score_gpt":0.25506440601429503,"score_spread":0.24152156606340133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2961459624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8115462,0.0006336828,0.00031187778,0.0000029957046,0.0006707274,0.00062063494,0.000016629478,0.000008078518,0.18618919],"genre_scores_gemma":[0.93581855,0.0006453868,0.018564783,0.000009493341,0.000089797344,0.0012197972,0.00078486605,0.00015967376,0.042707656],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841785,0.00004272197,0.0005804685,0.00036813237,0.00020231665,0.00038852525],"domain_scores_gemma":[0.999355,0.000031854073,0.0001560748,0.0003887086,0.000023023069,0.000045295936],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003092427,0.00030374478,0.0004893253,0.00025876722,0.000020682915,0.00007470593,0.0005466659,0.00015346947,0.0023357875],"category_scores_gemma":[0.000006566342,0.00034938447,0.000079939586,0.00038954391,0.000007198015,0.00013035983,0.00013304692,0.00017248908,0.000065476685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004806137,0.00033455473,0.0015898371,0.001496239,0.0011354072,0.00012687201,0.0018752507,0.45453456,0.0027722185,0.000117875185,0.018272351,0.51726425],"study_design_scores_gemma":[0.0028124047,0.00021789131,0.027293088,0.0025024568,0.0005323597,0.0000026062573,0.0016883891,0.5852454,0.0740197,0.000023635572,0.30368528,0.001976827],"about_ca_topic_score_codex":0.00024829223,"about_ca_topic_score_gemma":0.0007646182,"teacher_disagreement_score":0.5152874,"about_ca_system_score_codex":0.00015165878,"about_ca_system_score_gemma":0.00002478056,"threshold_uncertainty_score":0.9998958},"labels":[],"label_agreement":null},{"id":"W2962947610","doi":"10.3390/en12152867","title":"Multi-Agent Optimization for Residential Demand Response under Real-Time Pricing","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"SaskPower","keywords":"Demand response; Electricity; Flexibility (engineering); Computer science; Electricity market; Heuristic; Electricity pricing; Renewable energy; Consumption (sociology); Electric power system; Mathematical optimization; Dynamic pricing; Electricity retailing; Environmental economics; Power (physics); Engineering; Microeconomics; Economics; Artificial intelligence","score_opus":0.008922518446154899,"score_gpt":0.21734951173443953,"score_spread":0.20842699328828462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2962947610","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81260556,0.00009870553,0.18445997,0.00007290878,0.0009451517,0.000264139,0.0000032014457,0.0005093725,0.0010409887],"genre_scores_gemma":[0.91986364,0.00017415828,0.06951766,0.000046704186,0.00022264705,0.00009374975,0.000041609746,0.0001024164,0.0099374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992156,0.0000406327,0.00018760435,0.00018937155,0.00013454555,0.0002322558],"domain_scores_gemma":[0.99951214,0.00012375665,0.000029530021,0.00026846875,0.000029713026,0.000036370682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002647613,0.00014176495,0.00014206507,0.00014001448,0.000054745862,0.00005470493,0.00011935228,0.000059313545,0.00014702306],"category_scores_gemma":[0.000030189312,0.0001480326,0.000055070494,0.00011378697,0.000012104939,0.00015631756,0.00005439205,0.00003832756,0.0000780451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000847127,0.000008599393,0.000047576086,0.000037305766,0.000053504427,0.0000014068953,0.00011295532,0.96526927,0.030766727,0.0002221522,0.003341832,0.00005398186],"study_design_scores_gemma":[0.00072294817,0.000033314343,0.0036969671,0.000028897359,0.00002589743,7.9964303e-7,0.00009918369,0.9750611,0.015169495,0.000018392859,0.004931109,0.00021185365],"about_ca_topic_score_codex":0.000024491786,"about_ca_topic_score_gemma":0.000008599682,"teacher_disagreement_score":0.114942305,"about_ca_system_score_codex":0.00011377593,"about_ca_system_score_gemma":0.000011692786,"threshold_uncertainty_score":0.60365945},"labels":[],"label_agreement":null},{"id":"W2963530719","doi":"10.1080/03155986.2019.1624491","title":"Least squares policy iteration with instrumental variables vs. direct policy search: comparison against optimal benchmarks using energy storage","year":2019,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Instrumental variable; Least-squares function approximation; Computer science; Mathematical optimization; Energy (signal processing); Econometrics; Algorithm; Mathematics; Statistics","score_opus":0.027285002775980303,"score_gpt":0.28937836300468023,"score_spread":0.26209336022869995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963530719","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8989853,0.00012053151,0.016061714,0.00019117142,0.00036162086,0.0008816279,0.00012455348,0.00013367215,0.08313979],"genre_scores_gemma":[0.9976834,0.000059923994,0.00049645046,0.00010374835,0.00040438317,0.00009129582,0.0008418463,0.000021726573,0.0002972381],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975314,0.000098393975,0.00058794813,0.0001596998,0.0011539254,0.00046859658],"domain_scores_gemma":[0.99904937,0.000082433835,0.000060832303,0.00023433298,0.0004111079,0.00016194346],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00082578894,0.00021637655,0.0002529892,0.0012048178,0.00037050017,0.0012347279,0.00018327127,0.00011226627,0.00004971394],"category_scores_gemma":[0.00004726914,0.0001907414,0.000029981395,0.0007603202,0.00007621266,0.0031689806,0.00013262234,0.00024118414,0.00004373292],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057972586,0.000011817841,0.001492852,0.00018799366,0.0000641924,7.642653e-7,0.0010450581,0.9440697,0.0002469513,0.050286137,0.00079735066,0.0017392127],"study_design_scores_gemma":[0.0006646345,0.00013127082,0.0021061124,0.00012916981,0.000002908264,0.0000132598125,0.001696077,0.9359712,0.0003538372,0.0000021822939,0.05870759,0.00022176653],"about_ca_topic_score_codex":0.0036935343,"about_ca_topic_score_gemma":0.000048215596,"teacher_disagreement_score":0.09869807,"about_ca_system_score_codex":0.00065732776,"about_ca_system_score_gemma":0.00039809578,"threshold_uncertainty_score":0.9998021},"labels":[],"label_agreement":null},{"id":"W2964471150","doi":"10.3390/en12153017","title":"Special Issue “Intelligent Control in Energy Systems”","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Microgrid; Energy management; HVAC; Computer science; Intelligent control; Control engineering; Operations research; Engineering; Control (management); Artificial intelligence; Energy (signal processing); Air conditioning","score_opus":0.0036594475874315428,"score_gpt":0.1703048158611204,"score_spread":0.16664536827368887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964471150","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2891136,0.0034610508,0.0049631745,0.00019170251,0.03455544,0.00039605857,0.000011940521,0.0011233002,0.6661837],"genre_scores_gemma":[0.98571473,0.00029502242,0.000046646233,0.00009271017,0.0055380603,0.000054642693,0.0000072781213,0.00004482522,0.008206109],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.999065,0.000028061648,0.0002466332,0.00017968657,0.00017967391,0.00030096897],"domain_scores_gemma":[0.99958575,0.000043734744,0.000019740968,0.00029406897,0.000013808096,0.000042911113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009460687,0.00017118914,0.0002376752,0.00017986643,0.000013702944,0.000046421323,0.00018515474,0.00006312412,0.0005910593],"category_scores_gemma":[0.000005174495,0.00017377727,0.000047702666,0.00016031729,0.000013503789,0.00010014754,0.000037294205,0.00007238143,0.0004966054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006559664,0.000009969873,0.0005972311,0.000032776334,0.000037461366,0.000013774065,0.00006427133,0.933767,0.00016973956,0.011111195,0.05241638,0.0017736102],"study_design_scores_gemma":[0.0003326033,0.000015403235,0.00061376655,0.00002768969,0.000005485109,0.0000013528729,0.00016260109,0.1486422,0.0010640579,0.00003053279,0.8489199,0.00018437738],"about_ca_topic_score_codex":0.00024707062,"about_ca_topic_score_gemma":0.00012523677,"teacher_disagreement_score":0.79650354,"about_ca_system_score_codex":0.00013073666,"about_ca_system_score_gemma":0.00000677705,"threshold_uncertainty_score":0.70864314},"labels":[],"label_agreement":null},{"id":"W2964737387","doi":"10.1109/sgc.2018.8777872","title":"Optimal Energy Dispatch of Smart Home Equipped with PV, WT, and ESS Using Load Control under RTP","year":2018,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Controllability; Photovoltaic system; Computer science; Battery (electricity); Automotive engineering; Demand response; Energy storage; Load profile; Electricity; Power (physics); Reliability engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.007808674778158333,"score_gpt":0.19379670570603602,"score_spread":0.1859880309278777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964737387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60824907,0.000078837154,0.38531452,0.000038547983,0.00021861517,0.000057929195,0.0000024134254,0.000132105,0.005907982],"genre_scores_gemma":[0.9939699,0.000016421007,0.0053247437,0.00009795465,0.00015076352,0.000008250154,0.0000017584571,0.00004383096,0.00038634843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990943,0.0000151652175,0.00018683614,0.00019449259,0.00021332943,0.00029584634],"domain_scores_gemma":[0.9995318,0.000030796044,0.000030458781,0.00025993746,0.00006736699,0.0000796281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009497854,0.00018348398,0.00023829768,0.00007739088,0.00004099337,0.000030474212,0.00010785035,0.00005419875,0.00010517831],"category_scores_gemma":[0.0000031136394,0.00015181158,0.000027185764,0.00015063731,0.00011375684,0.00013581099,0.00006676409,0.00004702404,0.0000050888193],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013368748,0.00004279134,0.0034407221,0.00007683435,0.0004341545,0.000010895069,0.00010783571,0.97540987,0.010534323,0.008512516,0.00073449546,0.0005618553],"study_design_scores_gemma":[0.002460866,0.0002982591,0.006723019,0.00006427383,0.00012361702,0.000013515428,0.00015645617,0.9723447,0.014440037,0.00009605687,0.0028015764,0.0004775987],"about_ca_topic_score_codex":0.00050164934,"about_ca_topic_score_gemma":0.00050225074,"teacher_disagreement_score":0.38572088,"about_ca_system_score_codex":0.00007592878,"about_ca_system_score_gemma":0.000017557057,"threshold_uncertainty_score":0.61906964},"labels":[],"label_agreement":null},{"id":"W2966510894","doi":"10.1109/isie.2019.8781186","title":"A Study on Markovian and Deep Learning Based Architectures for Household Appliance-level Load Modeling and Recognition","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Markov process; Markov chain; Hidden Markov model; Machine learning; Artificial intelligence; Architecture; Enhanced Data Rates for GSM Evolution; Recurrent neural network; Artificial neural network; State (computer science); Identification (biology); Deep learning; Energy consumption; Load balancing (electrical power); Distributed computing; Algorithm; Engineering","score_opus":0.04273608138827815,"score_gpt":0.2177953068973649,"score_spread":0.17505922550908676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2966510894","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86267805,0.000042060456,0.13448589,0.000016047716,0.000085906955,0.00055809715,0.0000029165633,0.00023245398,0.0018985647],"genre_scores_gemma":[0.99556506,0.000006601392,0.0039984128,0.000077103745,0.000049496764,0.00011806724,0.000005471598,0.000042127147,0.0001376524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935436,0.000014093486,0.00011423564,0.00022843695,0.00011455797,0.00017432371],"domain_scores_gemma":[0.9997471,0.0000664479,0.000012510616,0.00011725592,0.000013511723,0.000043179636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016324359,0.00013960949,0.00012589396,0.00008918434,0.00004621014,0.000041073956,0.00004195927,0.00003403513,0.000009561147],"category_scores_gemma":[0.000013462259,0.00013297297,0.000019310477,0.000052304218,0.0000057130524,0.000024159152,0.000023699415,0.000105055806,0.0000046567097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003758308,0.00002026377,0.0023252799,0.000076817676,0.000032571472,9.92644e-7,0.00016900075,0.975827,0.00012370825,0.0000058868513,0.000019929797,0.021360988],"study_design_scores_gemma":[0.0011519316,0.00017570067,0.004279818,0.000031885877,0.000020452177,7.291874e-7,0.00042427809,0.99325,0.00020557734,0.00009574581,0.00017256266,0.00019128564],"about_ca_topic_score_codex":0.000024443669,"about_ca_topic_score_gemma":0.00007235947,"teacher_disagreement_score":0.132887,"about_ca_system_score_codex":0.00003462076,"about_ca_system_score_gemma":0.0000029834348,"threshold_uncertainty_score":0.5422481},"labels":[],"label_agreement":null},{"id":"W2967423608","doi":"10.1145/3342428.3343033","title":"Electric Device Recognition and Recommendation in Real-Time Based on Complex Event Processing for Smart Homes","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Ambient intelligence; Context (archaeology); Computer science; Event (particle physics); Activity recognition; Power consumption; Home automation; Order (exchange); Recommender system; Consumption (sociology); Real-time computing; Embedded system; Power (physics); Human–computer interaction; Artificial intelligence; Telecommunications; World Wide Web; Business","score_opus":0.026410219747221544,"score_gpt":0.24127508697708405,"score_spread":0.2148648672298625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967423608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9202266,0.000018810726,0.033478208,0.0005399781,0.00021392232,0.0010870786,0.000007268119,0.0004933071,0.043934826],"genre_scores_gemma":[0.99423724,0.000025599715,0.0049591158,0.00018770724,0.000033992994,0.000093708004,0.00026813187,0.00002945686,0.00016506275],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943817,0.000017070426,0.00015861233,0.00015890466,0.00006418839,0.00016306703],"domain_scores_gemma":[0.99977565,0.00007859975,0.000023364553,0.00007634732,0.000021884623,0.00002414015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001948546,0.000100871024,0.000112485664,0.00020966855,0.000021623013,0.00002866061,0.000035231344,0.000033753047,0.00020907595],"category_scores_gemma":[0.0000108931345,0.0001039528,0.000016692977,0.00020386747,0.000002294048,0.00011398563,0.000007918475,0.000042397733,0.00005029729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017641105,0.0001791764,0.0054288087,0.0012202206,0.000047847578,0.0000011840356,0.00011478111,0.31585205,0.029337881,0.000102331825,0.0088377725,0.63870156],"study_design_scores_gemma":[0.0006803015,0.000080460806,0.015927847,0.000056988527,0.000007762057,3.066323e-7,0.000016371718,0.9781708,0.0018891911,0.00007885641,0.0029428224,0.00014825373],"about_ca_topic_score_codex":0.000029471434,"about_ca_topic_score_gemma":0.000037648028,"teacher_disagreement_score":0.66231877,"about_ca_system_score_codex":0.00011566946,"about_ca_system_score_gemma":0.000007070526,"threshold_uncertainty_score":0.42390722},"labels":[],"label_agreement":null},{"id":"W2968064525","doi":"10.5539/eer.v9n2p1","title":"Dynamic Electricity Pricing – Modeling Manufacturer Response and an Application to Cement Processing","year":2019,"lang":"en","type":"article","venue":"Energy and Environment Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Flexibility (engineering); Dynamic pricing; Electricity pricing; Production schedule; Environmental economics; Incentive; Production (economics); Scheduling (production processes); Electricity generation; Electricity retailing; Schedule; Industrial organization; Microeconomics; Computer science; Business; Economics; Operations management","score_opus":0.011559981711546931,"score_gpt":0.2546693205886584,"score_spread":0.24310933887711145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968064525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8264313,0.0003189019,0.1724249,0.00015011088,0.000020751293,0.00017489676,4.7854473e-7,0.000056616864,0.00042204952],"genre_scores_gemma":[0.9976403,0.0005064392,0.0012066682,0.000048496524,0.000028609908,0.00010404712,0.000009605694,0.00003158339,0.00042421892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998664,0.00008551194,0.00013692296,0.0003753466,0.00035505864,0.0003831284],"domain_scores_gemma":[0.99954057,0.000029696284,0.000009828568,0.00027227882,0.000007941029,0.0001396731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007874495,0.0001350897,0.00010884134,0.00022941154,0.00014164136,0.00006216314,0.00011192291,0.00006007825,0.000026701588],"category_scores_gemma":[0.000005042737,0.00013345368,0.000010398872,0.00013566618,0.000022284466,0.0001481591,0.00014519236,0.0001434257,0.00001745309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007859488,0.000020612018,0.00017562014,0.000032501997,0.000011230809,0.00000128957,0.00015193797,0.9162889,0.028271742,0.00024674277,0.000015997355,0.05470482],"study_design_scores_gemma":[0.00017363415,0.00011151361,0.0052702115,0.000013936383,0.0000041167496,0.0000013365712,0.00009885517,0.9820402,0.0030730858,0.00028975037,0.008758517,0.00016479555],"about_ca_topic_score_codex":0.00008099228,"about_ca_topic_score_gemma":0.00001993732,"teacher_disagreement_score":0.17121822,"about_ca_system_score_codex":0.00022931505,"about_ca_system_score_gemma":0.0000063737607,"threshold_uncertainty_score":0.5442083},"labels":[],"label_agreement":null},{"id":"W2969449376","doi":"10.11591/ijai.v8.i3.pp292-298","title":"Multi-verse optimization based evolutionary programming technique for power scheduling in loss minimization scheme","year":2019,"lang":"en","type":"article","venue":"IAES International Journal of Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec","funders":"Ministry of Education, India","keywords":"Computer science; Scheduling (production processes); Electric power system; Reliability engineering; Real-time computing; Distributed computing; Power (physics); Mathematical optimization; Engineering; Mathematics","score_opus":0.020876728755271055,"score_gpt":0.27988518109635463,"score_spread":0.25900845234108355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969449376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018923981,0.00007080167,0.9781664,0.00018260677,0.0021328316,0.00037229696,0.00000533278,0.00004636783,0.00009940424],"genre_scores_gemma":[0.5909396,0.000018113797,0.40881282,0.00003099475,0.00012780222,0.000027026552,0.000013316745,0.00002111655,0.000009202913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985724,0.00002463258,0.0006983234,0.00015467586,0.00036039055,0.00018954268],"domain_scores_gemma":[0.9990375,0.000094307696,0.00019151313,0.00011409957,0.0005153535,0.00004724135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037798894,0.00014475756,0.000162738,0.00053985196,0.000025428903,0.00006547038,0.0003729425,0.000088037654,0.00013213133],"category_scores_gemma":[0.00019374462,0.0001576665,0.000109815825,0.0002470579,0.000035775254,0.00043378212,0.000029355098,0.00017007058,0.000013941157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010505718,0.00011861905,0.0012659334,0.00002207255,0.00004880596,0.000013418973,0.000108505905,0.99119306,0.0037729344,0.0011735614,0.000024479838,0.0021535782],"study_design_scores_gemma":[0.0001600102,0.00007404005,0.00013254979,0.00018552144,0.000007553797,0.000011479783,0.00028204627,0.9790352,0.018861756,0.00017896212,0.000914455,0.0001564306],"about_ca_topic_score_codex":0.000005240845,"about_ca_topic_score_gemma":0.000007757646,"teacher_disagreement_score":0.57201564,"about_ca_system_score_codex":0.00031335867,"about_ca_system_score_gemma":0.000055260854,"threshold_uncertainty_score":0.64294535},"labels":[],"label_agreement":null},{"id":"W2969550468","doi":"10.1109/tia.2019.2936330","title":"Bottom-Up Load Forecasting With Markov-Based Error Reduction Method for Aggregated Domestic Electric Water Heaters","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Siemens","keywords":"Mean squared error; Mean absolute percentage error; Computer science; Benchmark (surveying); Markov chain; Particle swarm optimization; Mathematical optimization; Electricity; Electrical load; Approximation error; Reduction (mathematics); Statistics; Algorithm; Engineering; Mathematics; Voltage; Machine learning","score_opus":0.016601417690014407,"score_gpt":0.24615112447263568,"score_spread":0.22954970678262127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969550468","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051838715,0.000009464291,0.94438475,0.00039542528,0.000546163,0.0015874872,0.00003449178,0.000619091,0.0005844012],"genre_scores_gemma":[0.9673381,0.0000027149922,0.02631106,0.00007657767,0.00011626935,0.004411097,0.000048288395,0.0001085597,0.0015873585],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985122,0.000033287677,0.00031169647,0.00043642576,0.00023368488,0.00047268247],"domain_scores_gemma":[0.99908227,0.0001076574,0.000048522703,0.0005333139,0.000111891364,0.00011633128],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020915797,0.0002949405,0.00022152721,0.00031505356,0.00023330968,0.000051383366,0.00018601294,0.00029391548,0.00014508334],"category_scores_gemma":[0.0000017987275,0.00026144707,0.000096005635,0.0007273474,0.000027571277,0.0001537645,0.0000010151651,0.0006470617,0.00007281804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008642403,0.00007360372,0.000004848864,0.00008663672,0.00014042713,7.146716e-7,0.00004873757,0.9646385,0.022579461,0.000024564559,0.0005224621,0.011793658],"study_design_scores_gemma":[0.0015469792,0.00019030362,0.000028828968,0.00007115889,0.00025317783,0.00004782648,0.00010898829,0.6611002,0.32724983,0.00004655374,0.008835403,0.0005207444],"about_ca_topic_score_codex":0.000039881972,"about_ca_topic_score_gemma":0.000010813544,"teacher_disagreement_score":0.9180737,"about_ca_system_score_codex":0.00045177253,"about_ca_system_score_gemma":0.00006825204,"threshold_uncertainty_score":0.9999838},"labels":[],"label_agreement":null},{"id":"W2969858312","doi":"10.1016/j.apenergy.2022.119160","title":"Shared community energy storage allocation and optimization","year":2022,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":107,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of Waterloo","funders":"","keywords":"Energy storage; Distributed generation; Computer science; Environmental economics; Integer programming; Electricity; Software deployment; Engineering; Renewable energy; Electrical engineering; Economics; Operating system","score_opus":0.00871000878942107,"score_gpt":0.17432631014287028,"score_spread":0.1656163013534492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969858312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021102564,0.00033166012,0.9093988,0.00009973837,0.00064223766,0.000088898596,0.000015744046,0.0010246853,0.06729566],"genre_scores_gemma":[0.99666566,0.00008688739,0.0018451127,0.00029986707,0.00006780323,0.0003248928,0.00039359878,0.000051187682,0.00026498278],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993063,0.00005968539,0.00015226423,0.00014001402,0.00017221615,0.00016950323],"domain_scores_gemma":[0.999543,0.00003342268,0.000028327731,0.0003306244,0.0000111195795,0.00005350527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013234385,0.0001394931,0.00011671352,0.000119871336,0.00031828412,0.000033230393,0.00019239682,0.000034615696,0.00018648406],"category_scores_gemma":[0.0000024396677,0.00017764152,0.000018729392,0.00025123142,0.000019696385,0.00007082841,0.00024495684,0.00013599663,0.0000014483999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059344193,0.000027682456,0.000002885709,0.000008973991,0.000032612843,0.0000011548639,0.00010173814,0.9224265,0.00070184696,0.06914294,0.0036738054,0.0038738984],"study_design_scores_gemma":[0.00037508243,0.000030379935,0.0001370269,0.0000020602297,0.000017817621,0.0000030780343,0.00038371093,0.8907033,0.0011397736,0.00069639244,0.1062394,0.00027194273],"about_ca_topic_score_codex":0.0004114886,"about_ca_topic_score_gemma":0.00010268421,"teacher_disagreement_score":0.9755631,"about_ca_system_score_codex":0.0001513147,"about_ca_system_score_gemma":0.000006498213,"threshold_uncertainty_score":0.7244011},"labels":[],"label_agreement":null},{"id":"W2972441210","doi":"10.4236/sgre.2019.107012","title":"Towards Optimal Planning and Scheduling in Smart Homes","year":2019,"lang":"en","type":"article","venue":"Smart Grid and Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Computer science; Scheduling (production processes); Energy management; Operations research; Distributed computing; Energy (signal processing); Engineering; Mathematics; Control (management); Artificial intelligence","score_opus":0.006435460962188067,"score_gpt":0.1923426022533912,"score_spread":0.18590714129120314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972441210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96088177,0.005799182,0.004167583,0.00009020943,0.0030342278,0.00008857805,0.0000037835123,0.00026946413,0.025665196],"genre_scores_gemma":[0.99384826,0.0011349773,0.00249619,0.00010590018,0.0005437211,0.000027657261,0.000027229831,0.000060690738,0.0017553617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878305,0.000023243683,0.00024823158,0.00034293364,0.00015962265,0.00044290657],"domain_scores_gemma":[0.999578,0.000037026624,0.000026051599,0.00022432346,0.000013674134,0.000120917044],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018199474,0.00025300117,0.00030816544,0.00025724113,0.00005875325,0.00007924965,0.00011594289,0.00011507982,0.000046131383],"category_scores_gemma":[0.000008920778,0.000245862,0.000035906363,0.00022924965,0.000038209226,0.00020943642,0.00014713944,0.00012212785,0.0000061685573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012181161,0.000010212158,0.024311699,0.00008656824,0.00004603883,0.000021557142,0.000109295856,0.9712084,0.0010213047,0.00048156606,0.0014176144,0.0012735531],"study_design_scores_gemma":[0.0020026017,0.00013951327,0.041600678,0.0003861826,0.00003555673,0.000041723993,0.00071184034,0.6507428,0.009202249,0.00029004226,0.29379603,0.0010507227],"about_ca_topic_score_codex":0.001423278,"about_ca_topic_score_gemma":0.00032644416,"teacher_disagreement_score":0.32046556,"about_ca_system_score_codex":0.00004916846,"about_ca_system_score_gemma":0.000017588934,"threshold_uncertainty_score":0.99999934},"labels":[],"label_agreement":null},{"id":"W2973797128","doi":"10.1016/j.jup.2019.100959","title":"Assessing the impact of residential load profile changes on electricity distribution utility revenues under alternative rate structures","year":2019,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"HEC Montréal","keywords":"Revenue; Photovoltaics; Electricity; Environmental economics; Load shifting; Electricity demand; Total revenue; Distribution (mathematics); Environmental science; Natural resource economics; Photovoltaic system; Electricity generation; Business; Economics; Engineering; Electrical engineering; Finance; Power (physics); Mathematics","score_opus":0.020388123385535948,"score_gpt":0.30757189646737915,"score_spread":0.2871837730818432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2973797128","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905891,0.000119310345,0.00046463657,0.00012757523,0.00028176673,0.00027181965,0.0001844466,0.00010257782,0.007858814],"genre_scores_gemma":[0.99904096,0.00004334879,0.0000104797855,0.000033141998,0.0004147248,0.000017304983,0.000053141655,0.000021225764,0.00036566192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9988992,0.00013774095,0.00018857261,0.00018174463,0.00025466888,0.00033807626],"domain_scores_gemma":[0.9992758,0.00014198679,0.00008101881,0.0003958599,0.00006831261,0.00003700104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029017543,0.00019257338,0.0002049739,0.000093352566,0.00007098545,0.00007699509,0.00022009364,0.00005884356,0.00012220077],"category_scores_gemma":[0.000121048404,0.0001398283,0.000099457575,0.00026572807,0.000081001584,0.0001392354,0.00006745366,0.00017382677,0.000013550789],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000473308,0.00022893833,0.02301017,0.0010986793,0.0021223477,0.000009738415,0.005565615,0.73919034,0.023641106,0.14319867,0.034499284,0.026961787],"study_design_scores_gemma":[0.00046224587,0.0001906144,0.88366437,0.00007959674,0.00003270071,0.0000019796228,0.00054981484,0.044587057,0.053664207,0.0146828145,0.0017754692,0.00030912584],"about_ca_topic_score_codex":0.0068629286,"about_ca_topic_score_gemma":0.00016716708,"teacher_disagreement_score":0.8606542,"about_ca_system_score_codex":0.0005667662,"about_ca_system_score_gemma":0.00009198991,"threshold_uncertainty_score":0.99975044},"labels":[],"label_agreement":null},{"id":"W2977424631","doi":"10.11575/prism/37175","title":"Residential Solar PV Standard","year":2019,"lang":"en","type":"article","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental science; Photovoltaic system; Engineering; Electrical engineering","score_opus":0.012397377890607495,"score_gpt":0.23637630642402688,"score_spread":0.22397892853341939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977424631","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6620881,0.00004493167,0.0018455986,0.00007161039,0.001253011,0.00025534097,0.000008334228,0.000012327795,0.33442074],"genre_scores_gemma":[0.9840636,0.000012064178,0.0046103355,0.000019060584,0.00014472783,0.0000085810125,0.000011254592,0.000029594303,0.01110077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994565,0.00000905367,0.00010539933,0.00013746292,0.00013377718,0.00015778183],"domain_scores_gemma":[0.9996526,0.000008862138,0.000010790705,0.0002793295,0.000011443859,0.000036971593],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00014437026,0.000078150515,0.00010407201,0.000037553345,0.000020627287,0.00014594317,0.00031028903,0.00003076921,0.008686445],"category_scores_gemma":[0.0000046116124,0.0000816006,0.000022617229,0.000070035734,0.00000661481,0.00019711729,0.00017227072,0.00006123255,0.004626933],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011618178,0.00003352943,0.0043691895,0.00006299666,0.0003541842,0.000094747935,0.00081743806,0.66534954,0.010711354,0.00045584462,0.15191293,0.16572209],"study_design_scores_gemma":[0.0005185821,0.000030473502,0.0017370012,0.000018938781,0.000013214615,0.0000013742402,0.000070400405,0.0055260253,0.024098214,0.00003698012,0.9677796,0.00016921782],"about_ca_topic_score_codex":0.000017740427,"about_ca_topic_score_gemma":0.000052010815,"teacher_disagreement_score":0.81586665,"about_ca_system_score_codex":0.00004813863,"about_ca_system_score_gemma":0.000010589399,"threshold_uncertainty_score":0.9961481},"labels":[],"label_agreement":null},{"id":"W2979426993","doi":"10.1049/iet-rpg.2019.0583","title":"Optimal scheduling of bidirectional energy conversion units in energy and ancillary service markets for system restoration within MCESs","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Scheduling (production processes); Computer science; Energy (signal processing); Operations research; Distributed computing; Mathematical optimization; Engineering; Physics; Mathematics","score_opus":0.011775429246855937,"score_gpt":0.18988286088962614,"score_spread":0.1781074316427702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979426993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91899467,0.0006135925,0.077465825,0.000035071913,0.0016273733,0.00016015556,0.000012066856,0.000111149806,0.0009801051],"genre_scores_gemma":[0.994492,0.00009695087,0.004628746,0.000050359347,0.00016365235,0.000057765148,0.00022790588,0.00003586266,0.0002467835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896216,0.000055568853,0.00034570726,0.0002556559,0.00020554417,0.00017536517],"domain_scores_gemma":[0.99944085,0.00003937584,0.00009063046,0.00018418906,0.0001989029,0.00004605257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032108984,0.00016340072,0.00019639428,0.00023876184,0.00005122616,0.00003640013,0.00007664031,0.00012696222,0.00001591294],"category_scores_gemma":[0.000010679251,0.00018595926,0.000021860697,0.00042598532,0.0000095972655,0.0003193728,0.000034441193,0.0000358497,0.0000011794398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005307261,0.000010238758,0.00046036794,0.0001736578,0.00003023296,9.0841206e-7,0.0000983934,0.9344673,0.06197005,0.0017881088,0.0008646191,0.000083027124],"study_design_scores_gemma":[0.0006319644,0.00004737318,0.00026077696,0.00008870403,0.000012898595,0.0000037787388,0.0002198215,0.8821415,0.1084578,0.0000076213537,0.007955826,0.00017196969],"about_ca_topic_score_codex":0.00069552095,"about_ca_topic_score_gemma":0.001359432,"teacher_disagreement_score":0.075497314,"about_ca_system_score_codex":0.00017453772,"about_ca_system_score_gemma":0.00004988922,"threshold_uncertainty_score":0.75831985},"labels":[],"label_agreement":null},{"id":"W2979571956","doi":"10.1109/ccece.2019.8861813","title":"A Methodology to Forecast the Control Capacity of a Population of Thermostatically Controlled Appliances in a Demand-Side Management","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Controllability; Computer science; Population; Reliability (semiconductor); Electric power system; Demand response; Control theory (sociology); Grid; Estimation; Renewable energy; Control (management); Wind power; Reliability engineering; Interval (graph theory); Power (physics); Simulation; Engineering; Mathematics; Electricity","score_opus":0.023932593989673002,"score_gpt":0.24023929406604153,"score_spread":0.2163067000763685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979571956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.757065,0.000030501962,0.22317055,0.00018840832,0.00015726147,0.0015291384,0.0000028170573,0.000038811962,0.017817508],"genre_scores_gemma":[0.9860417,0.0000076080173,0.013484003,0.00013838132,0.000011017023,0.00019178323,0.0000014628037,0.0000129253895,0.00011109981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989766,0.00012994542,0.00043049594,0.00012855936,0.00015599809,0.00017842151],"domain_scores_gemma":[0.99923944,0.00039809244,0.000060053088,0.00025381538,0.00002451694,0.000024047944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008604194,0.000112999514,0.0004407229,0.00012622167,0.000008039641,0.000004997501,0.0001647788,0.000034145323,0.00006695954],"category_scores_gemma":[0.000039296658,0.00007504403,0.00006536562,0.0002008564,0.000019710858,0.000036607587,0.00003480664,0.0000516383,0.000010075756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003729403,0.000033457556,0.009626611,0.00018863032,0.00031951963,0.0000012282927,0.00033200064,0.9177544,0.0031752822,0.06479803,0.00008836406,0.0033095346],"study_design_scores_gemma":[0.011907278,0.00021919263,0.33970532,0.000114191076,0.00016554899,0.0000015910413,0.0007648168,0.6371541,0.002508605,0.006566872,0.00057529996,0.00031716752],"about_ca_topic_score_codex":0.00027282914,"about_ca_topic_score_gemma":0.00046478293,"teacher_disagreement_score":0.3300787,"about_ca_system_score_codex":0.0000365192,"about_ca_system_score_gemma":0.0000020182292,"threshold_uncertainty_score":0.30602068},"labels":[],"label_agreement":null},{"id":"W2979746138","doi":"10.1109/ccece.2019.8861523","title":"ETX: A Flexible Simulation Framework for Design of Transactive Energy Systems","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Transactive memory; Computer science; Grid; Electricity; Energy (signal processing); Distributed computing; Risk analysis (engineering); Knowledge management; Engineering; Business","score_opus":0.020315682793901627,"score_gpt":0.23101468315871823,"score_spread":0.2106990003648166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979746138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013403292,0.000094314004,0.993484,0.0000061515566,0.0006540971,0.00029797637,0.0000024777169,0.00021532408,0.0039052963],"genre_scores_gemma":[0.9737813,0.0000107120295,0.025161626,0.000015194172,0.000059517086,0.000073291405,0.0000035806363,0.000030838455,0.0008639661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948007,0.0000138281885,0.00016002358,0.000107509986,0.00010091184,0.00013763878],"domain_scores_gemma":[0.99946016,0.00028233294,0.000021921487,0.00017910996,0.000033154738,0.000023291106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008926675,0.00009329146,0.00015004413,0.00007599581,0.000010255253,0.000011397349,0.00007596057,0.00007448469,0.00006587381],"category_scores_gemma":[0.0000070129386,0.000090548805,0.000043438293,0.000115509014,0.0000049083546,0.00008373522,0.0000044516923,0.00003188475,0.000011434446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020675943,0.000008747261,0.000014210099,0.00010398127,0.000076302094,9.111808e-8,0.00006025496,0.9583285,0.00049388094,0.040235173,0.00015809976,0.0005001269],"study_design_scores_gemma":[0.00021562802,0.000056375775,0.00003174717,0.000037477806,0.000015484113,9.49128e-8,0.0000695019,0.9882831,0.0068032905,0.0011463225,0.0032351594,0.000105807194],"about_ca_topic_score_codex":0.000028674416,"about_ca_topic_score_gemma":8.915389e-7,"teacher_disagreement_score":0.97244096,"about_ca_system_score_codex":0.00004419482,"about_ca_system_score_gemma":0.000005075608,"threshold_uncertainty_score":0.36924732},"labels":[],"label_agreement":null},{"id":"W2979814825","doi":"10.1049/iet-stg.2019.0019","title":"Two stages K‐means and PSO‐based method for optimal allocation of multiple parallel DRPs application &amp; deployment","year":2019,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Library science; Engine department; Art history; Engineering; Computer science; Art; Mechanical engineering","score_opus":0.013492751901506618,"score_gpt":0.2593642453624749,"score_spread":0.24587149346096826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979814825","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13771683,0.00011493877,0.860133,0.00016869754,0.00047760335,0.0008612839,0.00003505042,0.00019904823,0.00029357837],"genre_scores_gemma":[0.6485586,0.00004761069,0.3500736,0.00008827282,0.00018606022,0.00056219456,0.00022975449,0.000067084766,0.00018683226],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901205,0.000029154007,0.00028151588,0.00027607506,0.00017319561,0.00022801402],"domain_scores_gemma":[0.99924546,0.00017446898,0.0000668671,0.00039746222,0.00005486345,0.000060876286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033052854,0.00017822627,0.00021847842,0.0001002027,0.00003479398,0.000019686096,0.00013204645,0.000055393713,0.00002006324],"category_scores_gemma":[0.000018812938,0.00018913849,0.00006367213,0.0001090112,0.000018223398,0.00010210352,0.00003813503,0.000064839995,0.000024102173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043050004,0.00004450182,0.009485873,0.00021768596,0.00007688682,1.3339273e-7,0.00008482514,0.96799505,0.016319184,0.0006335175,0.0025428443,0.0025564674],"study_design_scores_gemma":[0.0017456842,0.00006373669,0.008966864,0.00002694521,0.000052511285,6.887954e-7,0.00003688412,0.8804268,0.016102394,0.00004810117,0.09227816,0.00025121638],"about_ca_topic_score_codex":0.000116651885,"about_ca_topic_score_gemma":0.00017748194,"teacher_disagreement_score":0.5108418,"about_ca_system_score_codex":0.0000654914,"about_ca_system_score_gemma":0.00001139909,"threshold_uncertainty_score":0.7712844},"labels":[],"label_agreement":null},{"id":"W2980156932","doi":"10.1049/iet-rpg.2019.0345","title":"Stochastic PV model for power system planning applications","year":2019,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Stochastic modelling; Photovoltaic system; Electric power system; Power (physics); Engineering; Electrical engineering; Mathematics; Physics; Statistics","score_opus":0.015036749008502161,"score_gpt":0.21745413008702238,"score_spread":0.20241738107852023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980156932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020375049,0.00022434405,0.9680737,0.000025766269,0.0010836251,0.00081671105,0.000019307292,0.00047539678,0.0089061],"genre_scores_gemma":[0.9899761,0.000002369395,0.0061978665,0.00005132629,0.00023978365,0.00083616335,0.00015540952,0.00006712829,0.0024738507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901265,0.00000900167,0.00025212872,0.0002776678,0.00017164518,0.0002769209],"domain_scores_gemma":[0.9993997,0.000021891377,0.000041944335,0.00040934814,0.00006482994,0.00006228754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014380687,0.00017974038,0.00016345303,0.00011652024,0.00009099743,0.00007872027,0.00013942749,0.00008783452,0.000028279328],"category_scores_gemma":[0.000004489155,0.00019734984,0.000059248836,0.00013542692,0.000007091923,0.00017190583,0.000026328147,0.000052290034,0.000092775954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004291962,0.000009322079,0.000017462535,0.000050752853,0.00003744966,1.9182185e-7,0.00013522383,0.9691963,0.015863076,0.0039743916,0.010679202,0.000032314238],"study_design_scores_gemma":[0.00030542366,0.000024724608,0.00001373933,0.000022690518,0.000021377655,0.0000015770818,0.000089373134,0.98688847,0.0021692337,0.000059718554,0.010183066,0.00022060607],"about_ca_topic_score_codex":0.000010809114,"about_ca_topic_score_gemma":0.000014299455,"teacher_disagreement_score":0.96960104,"about_ca_system_score_codex":0.0001569421,"about_ca_system_score_gemma":0.000021834947,"threshold_uncertainty_score":0.80476934},"labels":[],"label_agreement":null},{"id":"W2980196141","doi":"10.1109/sege.2019.8859787","title":"A Network of BIMGs Participating in Demand Response Using EVs and HVAC Units","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"HVAC; Photovoltaic system; Apartment; Renewable energy; Demand response; Automotive engineering; Building automation; Electric power system; Building management system; Grid; Air conditioning; Computer science; Engineering; Architectural engineering; Control (management); Power (physics); Electrical engineering; Electricity; Civil engineering","score_opus":0.02313553897633725,"score_gpt":0.21912437031745735,"score_spread":0.1959888313411201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980196141","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950386,0.00013845674,0.0026442863,0.000014908713,0.00014157454,0.00008597278,3.0138818e-7,0.00005294458,0.0018829076],"genre_scores_gemma":[0.9980434,0.0000075327166,0.0017567832,0.000024221257,0.000023352512,0.000009426613,3.9323137e-7,0.000015412363,0.00011943244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994381,0.00004231791,0.00017593597,0.00008619564,0.00006811412,0.00018934601],"domain_scores_gemma":[0.9996875,0.00011835606,0.000017438906,0.00013403357,0.000014666534,0.000027991548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003991067,0.00007366048,0.00012436183,0.00006138082,0.000010637434,0.000009107678,0.00004315975,0.000029025552,0.0000546273],"category_scores_gemma":[0.0000393549,0.00007343854,0.000007728425,0.0003392013,0.000009475854,0.00006864589,0.00005307197,0.000047270933,0.0000044889157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003301769,0.0000028148766,0.06335011,0.00003797904,0.000011915443,0.0000022003192,0.00015161786,0.93400633,0.0017456866,0.00039242557,0.00011436951,0.00015150367],"study_design_scores_gemma":[0.0003485237,0.000026067506,0.07593479,0.00009189559,0.00000863907,0.000001019803,0.00010612357,0.92139304,0.0012748432,0.00008223572,0.00062340347,0.00010941952],"about_ca_topic_score_codex":0.000052569034,"about_ca_topic_score_gemma":0.000038513936,"teacher_disagreement_score":0.012613317,"about_ca_system_score_codex":0.000029620865,"about_ca_system_score_gemma":0.0000074795234,"threshold_uncertainty_score":0.29947367},"labels":[],"label_agreement":null},{"id":"W2980217178","doi":"10.1109/sege.2019.8859885","title":"Operational Optimization of a Remote Off-Grid Hybrid Renewable Energy System in Northern Canada","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Particle swarm optimization; Renewable energy; Computer science; Grid; Energy management; Energy management system; Optimization problem; Mathematical optimization; Operations research; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.0029601695223000213,"score_gpt":0.14444908798964834,"score_spread":0.14148891846734832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980217178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36260986,0.0003666897,0.3805662,0.00012400512,0.0036171305,0.00039691062,0.00002868494,0.00039098033,0.25189954],"genre_scores_gemma":[0.9942708,0.000019517767,0.0036870243,0.00004486349,0.00006965881,0.0000053014173,0.00006737347,0.000025195239,0.0018102851],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992811,0.000012698946,0.00024470186,0.00012474894,0.00019437147,0.00014236062],"domain_scores_gemma":[0.99968576,0.00001372359,0.000023014163,0.00020522444,0.000041646454,0.000030602132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000068141584,0.000096347474,0.00014164692,0.00007990801,0.000010581194,0.0000097725615,0.00010440868,0.000021097867,0.00010849941],"category_scores_gemma":[0.0000040250097,0.000098787044,0.000017074299,0.00014638474,0.0000035247656,0.000078497236,0.000027280581,0.00002811732,0.0000044964927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002835343,0.0000035377373,0.0015627719,0.000053738844,0.000019956698,0.000004513249,0.000005233926,0.99414015,0.00008958043,0.00031565686,0.003559898,0.00024214962],"study_design_scores_gemma":[0.00022769513,0.000007100572,0.0003642928,0.0000375398,0.0000032120438,0.000002505083,0.000046279514,0.9828905,0.0029307513,0.0000015724171,0.013381812,0.00010674152],"about_ca_topic_score_codex":0.658718,"about_ca_topic_score_gemma":0.9125516,"teacher_disagreement_score":0.63166094,"about_ca_system_score_codex":0.00038519024,"about_ca_system_score_gemma":0.00009225156,"threshold_uncertainty_score":0.40284187},"labels":[],"label_agreement":null},{"id":"W2980645258","doi":"10.3386/w26385","title":"The Electric Gini: Income Redistribution through Energy Prices","year":2019,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Health; University of Alberta","funders":"","keywords":"Redistribution (election); Redistribution of income and wealth; Gini coefficient; Economics; Income distribution; Inequality; Econometrics; Economic inequality; Microeconomics; Mathematics; Political science","score_opus":0.16514139845976614,"score_gpt":0.43433848679856857,"score_spread":0.2691970883388024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980645258","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00055166456,0.0043947655,0.00033789178,0.00030766093,0.002620321,0.00032462538,0.00006198379,0.00008541137,0.99131566],"genre_scores_gemma":[0.9523908,0.026558554,0.00010626665,0.000012457286,0.0034704236,0.0003698574,0.0013850369,0.00013844423,0.015568156],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965738,0.00008759679,0.00069005147,0.00037749845,0.0017322968,0.0005387759],"domain_scores_gemma":[0.99740165,0.00091637246,0.00018503374,0.0005046949,0.0009400691,0.000052194795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033374806,0.00024014384,0.00036565377,0.0004878515,0.00016720273,0.00010544646,0.00081366743,0.00032611168,0.00010475142],"category_scores_gemma":[0.00043976944,0.00020990218,0.00015348617,0.0004030513,0.00010757025,0.00019105342,0.00021332687,0.0006295297,0.00016082925],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001869884,0.000019683772,0.000067313595,0.00021700026,0.0005011099,0.0000023473503,0.000010459178,0.067838475,0.00007420571,0.5706957,0.3581568,0.002398188],"study_design_scores_gemma":[0.00023772457,0.00006704956,0.000823243,0.000076480515,0.000017577997,0.000010358509,0.000013651276,0.022923488,0.0008551444,0.10796062,0.86672944,0.00028519603],"about_ca_topic_score_codex":0.00095139403,"about_ca_topic_score_gemma":0.00013510611,"teacher_disagreement_score":0.9757475,"about_ca_system_score_codex":0.004363377,"about_ca_system_score_gemma":0.0013456985,"threshold_uncertainty_score":0.9994587},"labels":[],"label_agreement":null},{"id":"W2982003591","doi":"10.25439/rmt.27596010","title":"Modelling the factors that influence the adoption intention of a residential energy management information system (REIMS)","year":2019,"lang":"en","type":"dissertation","venue":"RMIT Research Repository (RMIT University Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Energy (signal processing); Energy management; Information system; Knowledge management; Environmental economics; Computer science; Engineering; Economics","score_opus":0.014467322726210449,"score_gpt":0.1943965992173545,"score_spread":0.17992927649114404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982003591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85680264,0.0002735877,0.008172881,0.000044950477,0.002012536,0.0010668475,0.000017962591,0.00046751258,0.13114111],"genre_scores_gemma":[0.9727081,0.00061955757,0.0000639637,0.0000032822647,0.000057898178,0.00001510812,0.00040755127,0.00004975362,0.026074782],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99709,0.00038942683,0.0004298762,0.00031504955,0.0013390416,0.00043662186],"domain_scores_gemma":[0.99838066,0.00015812885,0.00025742417,0.00090095843,0.00021894478,0.000083856066],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036011508,0.00032059493,0.00028141701,0.00094622205,0.0005552471,0.00030310577,0.0013213371,0.00028218393,0.000013648479],"category_scores_gemma":[0.000007106819,0.00025631918,0.00022854046,0.0008174399,0.00010285991,0.0024829805,0.00032056752,0.0006761024,0.000026175938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027669276,0.000025949186,0.0015731024,0.0028100929,0.0007268932,0.000050375118,0.0018793669,0.9496822,0.000122050136,0.03627431,0.006067422,0.0005115377],"study_design_scores_gemma":[0.0012849488,0.00020386445,0.046455845,0.0035382495,0.000728656,0.000010579894,0.12489376,0.69924027,0.023542652,0.00012820611,0.09862826,0.0013446898],"about_ca_topic_score_codex":0.0023007635,"about_ca_topic_score_gemma":0.00004401443,"teacher_disagreement_score":0.2504419,"about_ca_system_score_codex":0.00048771547,"about_ca_system_score_gemma":0.000091786234,"threshold_uncertainty_score":0.9999889},"labels":[],"label_agreement":null},{"id":"W2982646473","doi":"10.1109/dasc/picom/cbdcom/cyberscitech.2019.00187","title":"Consumer Segmentation: Improving Energy Demand Management through Households Socio-Analytics","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Demographics; Consumption (sociology); Electricity; Energy consumption; Environmental economics; Smart meter; Tariff; Load management; Analytics; Computer science; Market segmentation; Consumer behaviour; Demand management; Energy management; Business; Energy (signal processing); Marketing; Data science; Economics; Engineering","score_opus":0.010363703403502149,"score_gpt":0.20171450480886496,"score_spread":0.1913508014053628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982646473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073821895,0.0005597973,0.46382338,0.00017857367,0.0022133647,0.00039404054,0.0000048900774,0.0014478953,0.45755616],"genre_scores_gemma":[0.97210133,0.00037931037,0.011882269,0.0006384328,0.00012509087,0.000050354065,0.000024114235,0.00008231842,0.014716762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988164,0.000015690275,0.00027675088,0.0002708399,0.00027639524,0.00034395844],"domain_scores_gemma":[0.9994353,0.000026633063,0.000034333145,0.0004296125,0.000020185322,0.00005393879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010191718,0.00022477328,0.00019446416,0.00006757601,0.00005352197,0.00007277771,0.00019283842,0.00006621028,0.0008150869],"category_scores_gemma":[0.0000011632801,0.00022286232,0.00008129691,0.00018693155,0.000022690407,0.00025586496,0.00012304733,0.0000709837,0.0003313513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008302854,0.00006225587,0.0049596922,0.00040987748,0.0013044829,0.00003706998,0.00022778487,0.8318455,0.0013381739,0.08639125,0.06489348,0.008522118],"study_design_scores_gemma":[0.004097949,0.00011383838,0.0052382634,0.00007686058,0.00073035294,0.00001423728,0.0024482263,0.44791895,0.03190205,0.0025968004,0.5027034,0.0021590304],"about_ca_topic_score_codex":0.000058794805,"about_ca_topic_score_gemma":0.000021003183,"teacher_disagreement_score":0.8982794,"about_ca_system_score_codex":0.00016394886,"about_ca_system_score_gemma":0.0000052456276,"threshold_uncertainty_score":0.90880615},"labels":[],"label_agreement":null},{"id":"W2983063421","doi":"10.1016/j.mineng.2019.106103","title":"Mine operations as a smart grid resource: Leveraging excess process storage capacity to better enable renewable energy sources","year":2019,"lang":"en","type":"article","venue":"Minerals Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Energy Research and Development; Office of Energy Efficiency; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy","keywords":"Renewable energy; Grid; Flexibility (engineering); Energy storage; Electricity; Smart grid; Peak demand; Computer science; Process engineering; Engineering; Electrical engineering; Power (physics)","score_opus":0.008593114841009209,"score_gpt":0.18646449952637167,"score_spread":0.17787138468536245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983063421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95988244,0.0002376529,0.026080275,0.00026617374,0.0011964975,0.00029500615,0.000012736998,0.00095723855,0.011071953],"genre_scores_gemma":[0.9833085,0.000011930149,0.0031986,0.00057242304,0.0009727837,0.0002931649,0.000063522435,0.00020066701,0.011378427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977411,0.000023924229,0.00045060864,0.0005415667,0.0004159063,0.0008268886],"domain_scores_gemma":[0.99891573,0.00005055991,0.000028318836,0.0006560067,0.000082072766,0.00026732485],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024306972,0.0004981862,0.00045396708,0.0004721988,0.00010712218,0.00021985818,0.0004600207,0.00012323211,0.0002529469],"category_scores_gemma":[0.000052504984,0.00054711377,0.00008987129,0.0008074045,0.000013424305,0.00044988116,0.00014076942,0.0002276688,0.00013748542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004772834,0.00001906866,0.0004109261,0.00018651485,0.00008647346,0.000015477417,0.00061953586,0.9190912,0.06759808,0.00010310571,0.011817493,0.0000473535],"study_design_scores_gemma":[0.00046429946,0.000051340976,0.0002673111,0.00018444937,0.000032314583,0.000019507916,0.000105837986,0.5770896,0.06605284,0.0000148213585,0.3548549,0.00086276495],"about_ca_topic_score_codex":0.0017722882,"about_ca_topic_score_gemma":0.0002867161,"teacher_disagreement_score":0.34303743,"about_ca_system_score_codex":0.00019779956,"about_ca_system_score_gemma":0.00001829674,"threshold_uncertainty_score":0.99969804},"labels":[],"label_agreement":null},{"id":"W2984772927","doi":"10.1007/s00202-019-00866-x","title":"An efficient hybrid structure to solve economic-environmental energy scheduling integrated with demand side management programs","year":2019,"lang":"en","type":"article","venue":"Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Greenhouse gas; Scheduling (production processes); Demand side; Demand response; Electricity; Demand management; Energy management; Electricity generation; Smart grid; Computer science; Business; Operations management; Economics; Engineering; Power (physics); Energy (signal processing)","score_opus":0.0014590429454083963,"score_gpt":0.14425221618902104,"score_spread":0.14279317324361265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984772927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7155743,0.00010170126,0.282734,0.000009961469,0.00031984536,0.00031246062,0.0000046472023,0.0005612851,0.0003817496],"genre_scores_gemma":[0.9781543,0.000016019278,0.02133863,0.00004289947,0.00013301338,0.00007090928,0.000073136056,0.0001249414,0.00004614246],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983204,0.000008217744,0.0002690154,0.00048116047,0.00024007932,0.0006811044],"domain_scores_gemma":[0.99927086,0.000017111572,0.000023749319,0.00042007782,0.0000064299597,0.00026178302],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007475649,0.00039341726,0.00028584685,0.00028604598,0.000039071354,0.0001009853,0.00029723998,0.0000635831,0.00006791099],"category_scores_gemma":[0.0000016902547,0.00037387462,0.000055447534,0.00024820858,0.000009549615,0.00011648821,0.00006550101,0.00018737973,0.000079160294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021533539,0.000035258316,0.00017978041,0.000031292835,0.0001665155,0.00003091373,0.000026106385,0.9814696,0.0065726973,0.0014901219,0.00003154177,0.009944679],"study_design_scores_gemma":[0.0004592567,0.00021734949,0.00075765897,0.00003781412,0.000033859094,0.000017272549,0.000028847699,0.9791137,0.013533251,0.000006241235,0.00527682,0.0005179529],"about_ca_topic_score_codex":0.00001313019,"about_ca_topic_score_gemma":0.000006481247,"teacher_disagreement_score":0.26257998,"about_ca_system_score_codex":0.00062862685,"about_ca_system_score_gemma":0.000008321015,"threshold_uncertainty_score":0.9998713},"labels":[],"label_agreement":null},{"id":"W2984883725","doi":"10.3390/en12224351","title":"Supply Side Management vs. Demand Side Management of a Residential Microgrid Equipped with an Electric Vehicle in a Dual Tariff Scheme","year":2019,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cegep de Sept Iles; Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Energy management; Renewable energy; Demand side; Prosumer; Photovoltaic system; Electric vehicle; Environmental economics; Tariff; Cost of electricity by source; Energy management system; Engineering; Automotive engineering; Electricity generation; Business; Power (physics); Energy (signal processing); Electrical engineering; Economics","score_opus":0.0039105886877790165,"score_gpt":0.1881049497228608,"score_spread":0.18419436103508177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984883725","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9877475,0.00062489917,0.00023075752,0.00006141865,0.0003031449,0.00048494013,0.000003548695,0.00028720568,0.0102566015],"genre_scores_gemma":[0.9903044,0.0005689542,0.007616889,0.00004772709,0.000084083986,0.00013940262,0.000034905188,0.00009205911,0.0011115444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99779224,0.000054185344,0.0004896951,0.00049428147,0.0004994488,0.00067016203],"domain_scores_gemma":[0.9990726,0.000029272498,0.000080557686,0.0007001848,0.00003082752,0.00008651901],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026733032,0.00036688076,0.00040497177,0.00055007386,0.000042810938,0.000077997756,0.00033511934,0.000081577884,0.00008059875],"category_scores_gemma":[0.0000021435844,0.00036786622,0.00007450218,0.000744218,0.000041207113,0.0003634823,0.00025974886,0.00017272563,0.000055440258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003599757,0.00016210742,0.0068841428,0.00077722373,0.000681501,0.0005224185,0.00023648462,0.9586816,0.021477878,0.0066361385,0.0011517105,0.0024288606],"study_design_scores_gemma":[0.014347241,0.001625,0.55365676,0.0013743497,0.0006223889,0.00005022692,0.0033400168,0.1615281,0.23079285,0.00093998824,0.028634338,0.0030887276],"about_ca_topic_score_codex":0.00028262055,"about_ca_topic_score_gemma":0.0004479764,"teacher_disagreement_score":0.7971535,"about_ca_system_score_codex":0.0001715838,"about_ca_system_score_gemma":0.0000135219025,"threshold_uncertainty_score":0.99987733},"labels":[],"label_agreement":null},{"id":"W2986649614","doi":"10.22215/etd/2019-13501","title":"Smart Grid Data Communication and Analytics","year":2019,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Energy management system; Computer science; Grid; Energy consumption; Energy management; Engineering; Database; Telecommunications; Electrical engineering; Energy (signal processing)","score_opus":0.02427260103746643,"score_gpt":0.24576104412226868,"score_spread":0.22148844308480226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2986649614","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034292594,0.004251369,0.003351253,0.00013014191,0.00548171,0.00054934574,0.000114702016,0.0009497282,0.95087916],"genre_scores_gemma":[0.569543,0.02718014,0.015749473,0.00030762263,0.0007909888,0.000079344325,0.17707944,0.0005352605,0.20873474],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940246,0.000010312492,0.00017069436,0.00018640177,0.00012054405,0.00010959663],"domain_scores_gemma":[0.99836874,0.00003239875,0.000030470232,0.0015172955,0.00002194581,0.00002913194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000110975314,0.00015527624,0.00016267244,0.00010290515,0.000025978336,0.000055326513,0.0005008356,0.000113522336,0.00010761038],"category_scores_gemma":[0.000011080369,0.00016276425,0.000015470714,0.000084127365,0.0000068720424,0.00013609396,0.00013050204,0.00015619188,0.00009548698],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018838919,0.00004306894,0.0016132653,0.0019996155,0.0011142057,0.000004242459,0.00047997697,0.12252922,0.00014706304,0.008661141,0.8405635,0.022825908],"study_design_scores_gemma":[0.00020938608,0.000009535293,0.010797616,0.000113167356,0.00019921295,8.741728e-7,0.00053399237,0.6139282,0.00015522895,0.000062257706,0.3735288,0.00046173998],"about_ca_topic_score_codex":0.00008646096,"about_ca_topic_score_gemma":0.0009352455,"teacher_disagreement_score":0.7421444,"about_ca_system_score_codex":0.000030431673,"about_ca_system_score_gemma":0.000008349669,"threshold_uncertainty_score":0.6637333},"labels":[],"label_agreement":null},{"id":"W2989516346","doi":"10.1049/iet-gtd.2019.0628","title":"Demand response procurement framework: a new four‐step probabilistic method","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Procurement; Probabilistic logic; Computer science; Operations research; Mathematical optimization; Risk analysis (engineering); Reliability engineering; Business; Mathematics; Engineering; Artificial intelligence; Electrical engineering; Marketing","score_opus":0.019440270987613386,"score_gpt":0.24828888677153607,"score_spread":0.22884861578392268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989516346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05235973,0.00024404873,0.9443409,0.0008595376,0.0007731971,0.00076794025,0.000025786425,0.00040801914,0.00022084147],"genre_scores_gemma":[0.9419053,0.00009432195,0.055440776,0.000111933405,0.00043749282,0.00013988791,0.00072180125,0.000060443224,0.0010880313],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981498,0.00020181094,0.00043827333,0.0004067285,0.00045349236,0.00034988474],"domain_scores_gemma":[0.99917865,0.00008232427,0.00005553622,0.00039080565,0.00008383848,0.00020886055],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00075480534,0.0002772335,0.00022620757,0.00007819159,0.00011224079,0.000103909675,0.0001554012,0.00019777117,0.0005556851],"category_scores_gemma":[0.000071752256,0.00026768175,0.00010592018,0.00033914318,0.000011977197,0.00020872224,0.00001801863,0.00020762067,0.00014628525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020809604,0.000054234213,0.00006619138,0.00012981576,0.000058735797,0.0000036071103,0.00014443762,0.8602464,0.08287211,0.0034277437,0.028557055,0.024231544],"study_design_scores_gemma":[0.0007966909,0.00012466607,0.0016672121,0.00010542444,0.00006502499,0.0000062478002,0.000017323697,0.7288492,0.040886328,0.0007962149,0.22631106,0.0003746451],"about_ca_topic_score_codex":0.000009544598,"about_ca_topic_score_gemma":0.0000043924983,"teacher_disagreement_score":0.88954556,"about_ca_system_score_codex":0.00034537166,"about_ca_system_score_gemma":0.00007917675,"threshold_uncertainty_score":0.9999775},"labels":[],"label_agreement":null},{"id":"W2989906032","doi":"10.1109/honet.2019.8907970","title":"Importance Scaling for Elastic Appliance for Automated Power Management in Smart Homes","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Weighting; Energy consumption; Function (biology); Computer science; Power consumption; Energy (signal processing); Energy management; Scaling; Power (physics); Memory management; Embedded system; Mathematical optimization; Engineering; Computer hardware; Mathematics; Electrical engineering","score_opus":0.006223825067454752,"score_gpt":0.2162168221590662,"score_spread":0.20999299709161146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989906032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5292413,0.00028838305,0.40114155,0.0001743845,0.0032066056,0.004676165,0.000019318835,0.0036939974,0.057558283],"genre_scores_gemma":[0.96578014,0.000023484703,0.030371828,0.00012261154,0.000041021704,0.000892214,0.00002587813,0.000070689704,0.0026721333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998949,0.0000031615039,0.00027477255,0.0002700947,0.0001079388,0.00039502556],"domain_scores_gemma":[0.99957395,0.00006319357,0.000024767722,0.00028191353,0.000017591572,0.000038558985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016349816,0.00017245192,0.00019649752,0.00013130665,0.00002064235,0.000029647945,0.00017005662,0.00004144113,0.000071959534],"category_scores_gemma":[0.00000654249,0.0001759416,0.00006128955,0.00018667181,0.000007435865,0.00010098364,0.000039230774,0.000041203428,0.000080497746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002988368,0.00003211267,0.004337601,0.0006936012,0.00014005152,0.0000035614592,0.00003532859,0.9631048,0.00031804087,0.01171718,0.018069316,0.0015185415],"study_design_scores_gemma":[0.0012346575,0.000029280856,0.01714954,0.000057677287,0.00001748409,4.1988366e-7,0.00009328172,0.9328757,0.0005029754,0.00028536515,0.047450166,0.0003034796],"about_ca_topic_score_codex":0.0000031058246,"about_ca_topic_score_gemma":0.0000231232,"teacher_disagreement_score":0.43653885,"about_ca_system_score_codex":0.00011855645,"about_ca_system_score_gemma":0.0000032568848,"threshold_uncertainty_score":0.71746904},"labels":[],"label_agreement":null},{"id":"W2990083057","doi":"10.1109/tii.2019.2955470","title":"Semisupervised Multilabel Deep Learning Based Nonintrusive Load Monitoring in Smart Grids","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Computer science; Smart grid; Artificial intelligence; Machine learning; Convolutional neural network; Deep learning; Feature (linguistics); Energy consumption; Feature extraction; Representation (politics); Energy (signal processing); Feature learning; Load management; Data mining; Pattern recognition (psychology); Engineering","score_opus":0.019449948693834596,"score_gpt":0.21465790601050377,"score_spread":0.19520795731666918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990083057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78831476,0.000015789614,0.19642696,0.000031198473,0.0069096712,0.0006997971,0.000011199492,0.00063547137,0.0069551747],"genre_scores_gemma":[0.9981982,0.000034494227,0.001166151,0.000039188,0.0001676739,0.000081721744,0.0000066708735,0.00005171992,0.000254171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99829286,0.00003690434,0.0006704063,0.00013138297,0.00042401592,0.0004444181],"domain_scores_gemma":[0.99926895,0.00016609627,0.00006665885,0.00032602221,0.000059516624,0.00011277088],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029069796,0.0002965719,0.00030109438,0.00038707408,0.00009322298,0.000085281754,0.00022321931,0.00029300692,0.0002183215],"category_scores_gemma":[0.000015349196,0.0003312502,0.00010204001,0.0005621117,0.000022859309,0.00046631572,0.0000029672622,0.0010703611,0.00037461822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042026866,0.000040652663,0.00075038435,0.00007462563,0.000054590655,0.0000026577213,0.00081603974,0.98672056,0.00022358708,0.0000028073296,0.00006435156,0.011207687],"study_design_scores_gemma":[0.0033894281,0.00010902113,0.00016121294,0.00021661508,0.000032884913,0.0000015364016,0.0011570065,0.9584923,0.032381993,0.000001332083,0.0036673762,0.00038934086],"about_ca_topic_score_codex":0.000074046286,"about_ca_topic_score_gemma":0.000025715626,"teacher_disagreement_score":0.20988348,"about_ca_system_score_codex":0.0006525775,"about_ca_system_score_gemma":0.00006385808,"threshold_uncertainty_score":0.99991393},"labels":[],"label_agreement":null},{"id":"W2990374856","doi":"10.1049/iet-gtd.2019.1135","title":"Layered stochastic approach for residential demand response based on real‐time pricing and incentive mechanism","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Mechanism (biology); Demand response; Incentive; Computer science; Response time; Microeconomics; Operations research; Economics; Engineering; Electricity","score_opus":0.00806998896918508,"score_gpt":0.20382580201762943,"score_spread":0.19575581304844436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990374856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23089574,0.000021363649,0.7678139,0.0000951668,0.00019772552,0.00066271087,0.0000746469,0.00016349214,0.000075258446],"genre_scores_gemma":[0.9941205,0.000017176628,0.0039004008,0.000027532466,0.00012493791,0.00012208858,0.00148182,0.000034274297,0.00017128498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987691,0.000115462906,0.00026812,0.00035037825,0.00026298227,0.0002339589],"domain_scores_gemma":[0.99950993,0.00008318359,0.000047381538,0.00020267541,0.00006306041,0.00009377989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048499054,0.00020243345,0.00017980153,0.00009856669,0.0001588701,0.00007451492,0.00007389748,0.00012556222,0.000044592565],"category_scores_gemma":[0.000025758443,0.00020364152,0.00006228303,0.00014959602,0.000013273906,0.00014246741,0.000009687543,0.0000851602,0.000011334853],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043932017,0.000030289613,0.000002987618,0.00005194471,0.000017705146,4.4575762e-7,0.00006004109,0.70670235,0.290773,0.00052930467,0.00097014516,0.0004224925],"study_design_scores_gemma":[0.0013609537,0.00016160736,0.00094507134,0.000042090644,0.00003987101,5.727174e-7,0.000015832205,0.93438226,0.06227764,0.00007656443,0.0004865154,0.00021103455],"about_ca_topic_score_codex":0.0000062845083,"about_ca_topic_score_gemma":6.770774e-7,"teacher_disagreement_score":0.7639135,"about_ca_system_score_codex":0.00018360057,"about_ca_system_score_gemma":0.00002651926,"threshold_uncertainty_score":0.83042604},"labels":[],"label_agreement":null},{"id":"W2990628747","doi":"10.1109/tii.2019.2953932","title":"Autonomous Power Management With Double-<i>Q</i>Reinforcement Learning Method","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"St. Francis Xavier University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Frequency scaling; Computer science; Energy consumption; Power management; Q-learning; Operating point; Kernel (algebra); Mobile device; Energy management; Energy (signal processing); Energy minimization; Efficient energy use; Battery (electricity); Power (physics); Embedded system; Real-time computing; Electronic engineering; Electrical engineering; Artificial intelligence; Engineering; Operating system","score_opus":0.017495813571329268,"score_gpt":0.22048472687086848,"score_spread":0.20298891329953922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990628747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017995855,0.0000027527424,0.8778188,0.000028511327,0.00209469,0.00081164454,0.0000030466072,0.0006605821,0.10058408],"genre_scores_gemma":[0.9855145,0.000027278651,0.0088093495,0.00014966975,0.00006723522,0.00015784318,0.0000141177,0.00007101643,0.0051889764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983492,0.000020771813,0.0005931323,0.00013801649,0.00045742522,0.00044148858],"domain_scores_gemma":[0.99926186,0.000050219787,0.000092085014,0.00044006587,0.000034478213,0.00012129483],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002770038,0.00032855378,0.00028279258,0.00035957442,0.00012334352,0.000121165736,0.00023489632,0.00016306956,0.00057951687],"category_scores_gemma":[5.407404e-7,0.00030266735,0.00009569697,0.00043570338,0.000021539332,0.0004417819,0.000004471246,0.0006668866,0.0006383431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116337666,0.00002840306,0.000008070856,0.00006270431,0.0003788713,0.0000032485414,0.0005109542,0.9885404,0.000010054387,0.00047720727,0.00062225177,0.009241479],"study_design_scores_gemma":[0.0080671115,0.0007450639,0.0000135447,0.00018857549,0.00023449048,0.000017580225,0.0021926805,0.7848438,0.011108085,0.000008327249,0.19166948,0.0009112642],"about_ca_topic_score_codex":0.000018576746,"about_ca_topic_score_gemma":0.0000032859023,"teacher_disagreement_score":0.9675187,"about_ca_system_score_codex":0.0003122786,"about_ca_system_score_gemma":0.000021945909,"threshold_uncertainty_score":0.99994254},"labels":[],"label_agreement":null},{"id":"W2991146912","doi":"10.1109/eem.2019.8916571","title":"Integrating Demand Response in Regional Electricity Markets: An Agent-Based Simulation","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Revenue; Renewable energy; Consumption (sociology); Environmental economics; Demand response; Supply and demand; Mains electricity; Quarter (Canadian coin); Industrial organization; Business; Natural resource economics; Economics; Microeconomics; Engineering; Finance","score_opus":0.01182086904819864,"score_gpt":0.230589087086767,"score_spread":0.21876821803856836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2991146912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91681105,0.000023232224,0.07961804,0.000052335537,0.0001290056,0.0001433409,3.4615297e-7,0.0002227359,0.002999933],"genre_scores_gemma":[0.99752206,0.0000024882795,0.001985474,0.00016822277,0.000030960557,0.000011238438,0.000011864097,0.000021349564,0.00024635682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922603,0.00010563643,0.00017808515,0.00015966759,0.00014412975,0.00018645807],"domain_scores_gemma":[0.99948925,0.00023244013,0.000016847842,0.00020606078,0.000017278904,0.00003815195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005316438,0.00010893711,0.00009839144,0.00021670494,0.000016850921,0.000025127392,0.000092797396,0.00004953095,0.00020386469],"category_scores_gemma":[0.00005323821,0.00010728105,0.000026005699,0.00027312874,0.000005388355,0.00016268111,0.000012170614,0.000099030905,0.000044250366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023852396,0.000017698296,0.0062953252,0.000013171155,0.000007057057,0.0000031971094,0.00003330962,0.98989564,0.00221652,0.00019766012,0.00025871294,0.0008231795],"study_design_scores_gemma":[0.0003988639,0.000044619755,0.08320998,0.000016359672,0.0000024568506,2.4461386e-7,0.000032722346,0.91277146,0.00084065105,0.000029200066,0.0025307871,0.00012266697],"about_ca_topic_score_codex":0.000028858776,"about_ca_topic_score_gemma":0.00007198994,"teacher_disagreement_score":0.080711015,"about_ca_system_score_codex":0.00018009897,"about_ca_system_score_gemma":0.00001292036,"threshold_uncertainty_score":0.4374794},"labels":[],"label_agreement":null},{"id":"W2992856267","doi":"10.1049/iet-gtd.2019.1343","title":"Framework for optimizing the demand contracted by large customers","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Demand management; Demand patterns; Work (physics); Demand forecasting; Microeconomics; Market demand schedule; Economics; Demand curve; Operations research; Computer science; Business; Environmental economics; Industrial organization; Operations management; Electricity; Engineering; International economics","score_opus":0.00912219710981073,"score_gpt":0.22584398677751238,"score_spread":0.21672178966770164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992856267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03637561,0.0004930466,0.9602813,0.00073895184,0.0008736358,0.00058998977,0.0002137916,0.000236228,0.00019744737],"genre_scores_gemma":[0.99310726,0.00022309394,0.0025561464,0.00016209157,0.00024175964,0.00014089265,0.003330024,0.000033592012,0.00020515466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989722,0.000041282,0.000264132,0.00021679758,0.00020387933,0.00030175145],"domain_scores_gemma":[0.9995287,0.000070103284,0.000042040178,0.00022214807,0.00006127446,0.00007570526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029354234,0.00017375217,0.0001432322,0.000025917474,0.00020770397,0.00008728031,0.00012565732,0.00014960668,0.00015635755],"category_scores_gemma":[0.00001744336,0.0001395746,0.00009191389,0.0001706016,0.000012804666,0.00016880638,0.0000072093803,0.000149788,0.00003307649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004249632,0.00006236299,0.0000703333,0.00008196885,0.00009784569,4.5486138e-7,0.00016056234,0.7267733,0.11330325,0.015624709,0.13704264,0.00674006],"study_design_scores_gemma":[0.00061720604,0.000024453238,0.00016200542,0.000024636878,0.00003640519,6.0697664e-7,0.00004398967,0.5575471,0.04862016,0.00011037192,0.39263847,0.00017458283],"about_ca_topic_score_codex":0.0000023078624,"about_ca_topic_score_gemma":0.0000012606137,"teacher_disagreement_score":0.95772517,"about_ca_system_score_codex":0.00010582938,"about_ca_system_score_gemma":0.000011611249,"threshold_uncertainty_score":0.5691687},"labels":[],"label_agreement":null},{"id":"W2993737652","doi":"10.48550/arxiv.1809.00512","title":"A Bilevel Approach to Optimal Price-Setting of Time-and-Level-of-Use Tariffs","year":2018,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Limit (mathematics); Computer science; Frame (networking); Mathematical optimization; Consumption (sociology); Time limit; Scheme (mathematics); Energy consumption; Resolution (logic); Energy (signal processing); Operations research; Optimization problem; Economics; Mathematics; Artificial intelligence; Statistics; Engineering","score_opus":0.09785578034691972,"score_gpt":0.1720687210870152,"score_spread":0.07421294074009549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2993737652","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7029019,0.000019656882,0.28953823,0.0000051817656,0.00026575723,0.00032510463,0.00007352236,0.00015859191,0.0067120455],"genre_scores_gemma":[0.97343695,0.000053950767,0.025005927,0.000011809478,0.00008847811,0.0000023031525,0.000035586832,0.000058693702,0.0013062791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986418,0.000042480035,0.00029131587,0.00059911865,0.00010405576,0.00032123833],"domain_scores_gemma":[0.9987616,0.00007448719,0.00014501571,0.00075167936,0.00012256742,0.00014466765],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023093293,0.00033494263,0.00047202766,0.0004504148,0.000038773844,0.000025021027,0.00056548766,0.00024120003,0.00003907631],"category_scores_gemma":[0.000045703968,0.00040740013,0.00013397705,0.00046746456,0.0000915255,0.00013563804,0.0012956797,0.00028074314,0.000032913296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002683465,0.000053987296,0.0015637818,0.0003471995,0.00029338003,0.000008791561,0.00036452024,0.994249,0.00023482328,0.0015868424,0.0011690034,0.0001018414],"study_design_scores_gemma":[0.00039313763,0.000054243937,0.011806751,0.00019042015,0.00019972993,0.0000017848603,0.000091175025,0.984271,0.0011957204,0.00024988063,0.00097054034,0.0005756419],"about_ca_topic_score_codex":0.00020968259,"about_ca_topic_score_gemma":0.000012811566,"teacher_disagreement_score":0.27053505,"about_ca_system_score_codex":0.00014344357,"about_ca_system_score_gemma":0.000038163034,"threshold_uncertainty_score":0.99983776},"labels":[],"label_agreement":null},{"id":"W2994112501","doi":"10.1109/tia.2019.2957432","title":"Developing and Testing a Unit-Commitment-Based Controller of Bus-Split Aggregated Residential Electric Water Heaters","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Controller (irrigation); Automotive engineering; Peak demand; Engineering; Computer science; Simulation; Control theory (sociology); Electricity; Control (management); Electrical engineering","score_opus":0.019735941043393927,"score_gpt":0.22440663841691472,"score_spread":0.20467069737352078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994112501","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49079746,0.000018780125,0.50687706,0.0003363317,0.00015537569,0.00074084377,0.000019840463,0.00029001632,0.0007642926],"genre_scores_gemma":[0.99706656,0.0000063135385,0.0019008098,0.00007355617,0.000032106072,0.0005671812,0.000012144187,0.000039107388,0.00030223804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99896544,0.000027407912,0.000315177,0.00023673763,0.0001819878,0.00027324076],"domain_scores_gemma":[0.9994027,0.00010490805,0.00003927998,0.00029279856,0.000092501905,0.00006783035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001242164,0.0001843216,0.0001918739,0.00029397607,0.00013125352,0.0000336699,0.00014196227,0.00018832287,0.00006851664],"category_scores_gemma":[0.000002199303,0.00017834337,0.00004202298,0.00058247044,0.00003203102,0.00008828,0.00000195008,0.0003959285,0.000043071617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023771963,0.000060383452,0.00033180683,0.000087760316,0.00015954411,7.9615216e-7,0.00004036154,0.9299193,0.063563846,0.00021943354,0.00009502755,0.0054979785],"study_design_scores_gemma":[0.00246725,0.00010094395,0.0032890078,0.00015594678,0.00018432271,0.00000859534,0.00012038511,0.18814342,0.79869515,0.00013883717,0.0061264294,0.00056971284],"about_ca_topic_score_codex":0.00007429693,"about_ca_topic_score_gemma":0.000009561415,"teacher_disagreement_score":0.7417759,"about_ca_system_score_codex":0.000112691734,"about_ca_system_score_gemma":0.00003293435,"threshold_uncertainty_score":0.72726315},"labels":[],"label_agreement":null},{"id":"W2994462904","doi":"10.1109/allerton.2019.8919681","title":"Optimal Operation of Sanitary Pump Stations with Energy Storage During Power Outages","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Richmond Hospital; Alberta Energy; University of British Columbia","funders":"","keywords":"Energy storage; Energy consumption; Energy (signal processing); Power (physics); Control (management); Computer science; Automotive engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.0026480455869319665,"score_gpt":0.1617506074099682,"score_spread":0.15910256182303623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994462904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92673856,0.000029764604,0.053299576,0.000023613244,0.00023119761,0.00006297403,0.0000039525016,0.00016570395,0.019444685],"genre_scores_gemma":[0.9940971,0.000012800881,0.0040154653,0.000015837875,0.000024359982,0.000012348369,0.000018207436,0.00002769689,0.0017761661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995004,0.000008124232,0.00012587474,0.00010854334,0.00013146522,0.0001256029],"domain_scores_gemma":[0.9997241,0.000014840646,0.000014415219,0.00019395459,0.00002472321,0.000027975173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000031997122,0.000095999996,0.000097472024,0.00009415491,0.000020575799,0.00001657384,0.00007218354,0.000023413477,0.0006783486],"category_scores_gemma":[0.0000019251252,0.00008509487,0.00001864267,0.00008943618,0.000009773386,0.00021458694,0.00002604405,0.000038043716,0.00003148486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006566887,0.0000121011535,0.0007618766,0.000024917888,0.0000583787,0.0000032749142,0.00013733703,0.9884707,0.008071283,0.0021950922,0.00022545613,0.000033052405],"study_design_scores_gemma":[0.0025910435,0.0004446018,0.14299586,0.00010341176,0.00008256839,0.000013835052,0.0026381747,0.62246376,0.21146192,0.00001982784,0.016052693,0.0011322905],"about_ca_topic_score_codex":0.000061101986,"about_ca_topic_score_gemma":0.00006252695,"teacher_disagreement_score":0.36600688,"about_ca_system_score_codex":0.00004012046,"about_ca_system_score_gemma":0.000006316415,"threshold_uncertainty_score":0.74274415},"labels":[],"label_agreement":null},{"id":"W2994956262","doi":"10.22215/etd/2013-06215","title":"Flexible residential smart grid simulation framework","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Library and Archives Canada","funders":"","keywords":"Grid; Computer science; Smart grid; Architectural engineering; Humanities; Engineering; Geography; Art; Electrical engineering","score_opus":0.009716316484631103,"score_gpt":0.2463406863999401,"score_spread":0.236624369915309,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994956262","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09838327,0.00090231735,0.1549582,0.000053645814,0.047311116,0.001207547,0.000012793474,0.005366172,0.69180495],"genre_scores_gemma":[0.73439455,0.00030566248,0.0075959032,0.000132802,0.0047561578,0.0003409298,0.0038707536,0.0004415554,0.24816166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874336,0.00001426464,0.00034138854,0.0002727925,0.00033600628,0.00029221227],"domain_scores_gemma":[0.9993115,0.00007161364,0.000051337956,0.00042802803,0.00006634677,0.00007116355],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00006759212,0.00031554172,0.000244876,0.0002521023,0.000058438472,0.00013474493,0.00021745065,0.00041883727,0.0034331726],"category_scores_gemma":[0.000037456364,0.00034009563,0.00010407779,0.00015971593,0.0000063112225,0.00019396056,0.000021977265,0.0003312581,0.0017272892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075563926,0.000008003412,0.000030234369,0.00018972837,0.00011126229,0.0000024146273,0.00011787439,0.92289466,0.000084429084,0.0019631486,0.072948284,0.0016424321],"study_design_scores_gemma":[0.00047652164,0.000056877663,0.025301564,0.000609012,0.00030874746,8.231276e-7,0.000521898,0.6597963,0.016430294,0.0059198006,0.28847322,0.0021049557],"about_ca_topic_score_codex":0.00015317996,"about_ca_topic_score_gemma":0.00020257784,"teacher_disagreement_score":0.6360113,"about_ca_system_score_codex":0.00010499019,"about_ca_system_score_gemma":0.00001382368,"threshold_uncertainty_score":0.9999051},"labels":[],"label_agreement":null},{"id":"W2995156716","doi":"10.1109/tii.2019.2960802","title":"An Efficient Peer-to-Peer Energy-Sharing Framework for Numerous Community Prosumers","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Fundamental Research Funds for the Central Universities; Natural Science Foundation of Hubei Province; China Postdoctoral Science Foundation; National Natural Science Foundation of China","keywords":"Renewable energy; Computer science; Peer-to-peer; Environmental economics; Energy management; Energy (signal processing); Efficient energy use; Distributed generation; Distributed computing; Engineering; Economics","score_opus":0.038397197624751175,"score_gpt":0.26295790518108386,"score_spread":0.22456070755633267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995156716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19031857,0.0000011751425,0.8026662,0.00012140206,0.0044014445,0.00064454763,0.00007874393,0.00045955714,0.0013083386],"genre_scores_gemma":[0.98827714,0.0000022881518,0.010360141,0.00024489447,0.00019346249,0.0002483951,0.00003961826,0.00007158359,0.0005625076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99823236,0.000034651453,0.0006081037,0.00012343349,0.0005344211,0.00046704247],"domain_scores_gemma":[0.998541,0.00019365737,0.00007275303,0.0008507568,0.00012805157,0.00021380969],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006082573,0.00029745672,0.00028865575,0.0003261468,0.00028856535,0.00017713188,0.0005218358,0.0003320469,0.0000821604],"category_scores_gemma":[0.000025366215,0.0003186684,0.00012385067,0.00046250093,0.000024225787,0.00029859957,0.000005498512,0.00090889086,0.00013195774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059292033,0.00011092743,0.000012243729,0.00005340667,0.00010614633,1.866103e-7,0.0019342552,0.98751,0.000030103552,0.00096603285,0.0013288937,0.007888489],"study_design_scores_gemma":[0.0015004041,0.0005119084,0.00001191356,0.00015285394,0.00008862755,0.0000025528739,0.0024995552,0.94775146,0.014198422,0.00016136338,0.032509226,0.0006116874],"about_ca_topic_score_codex":0.000103912156,"about_ca_topic_score_gemma":0.000024477455,"teacher_disagreement_score":0.79795855,"about_ca_system_score_codex":0.00030158486,"about_ca_system_score_gemma":0.000030052068,"threshold_uncertainty_score":0.99992657},"labels":[],"label_agreement":null},{"id":"W2995371371","doi":"","title":"Time of use pricing for demand response","year":2019,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; On demand; Computer science; Engineering; Electrical engineering","score_opus":0.01295226907242878,"score_gpt":0.20799361032204414,"score_spread":0.19504134124961536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995371371","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47462526,0.00045243822,0.5148556,0.0008202152,0.00044679648,0.00077051966,0.00008235959,0.0003825651,0.0075642467],"genre_scores_gemma":[0.9333367,0.00025932572,0.050696034,0.000033504635,0.000027692826,0.00012721575,0.0003282812,0.00011924226,0.015072047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970969,0.001468754,0.0004750026,0.00042309094,0.0002546687,0.00028156827],"domain_scores_gemma":[0.994482,0.002522572,0.00022482911,0.0018880324,0.0008020187,0.00008057983],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0045199553,0.00027395334,0.00038567572,0.0002466017,0.00007486097,0.00013913763,0.0007486558,0.00021009706,0.000052024818],"category_scores_gemma":[0.0012819025,0.00031545854,0.0001899631,0.00019434141,0.00008306732,0.00011552271,0.00075200456,0.00026967964,0.000038309136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016844658,0.0003136818,0.0016691028,0.0017910928,0.0005688553,0.0000034787304,0.009371984,0.9309841,0.025172584,0.010138805,0.015171788,0.0046461024],"study_design_scores_gemma":[0.0007478513,6.61808e-7,0.008089616,0.002199159,0.00010700823,0.0000018837301,0.000049426635,0.84519285,0.10040699,0.00046834844,0.04214176,0.0005944756],"about_ca_topic_score_codex":0.00009472634,"about_ca_topic_score_gemma":0.000059780617,"teacher_disagreement_score":0.46415958,"about_ca_system_score_codex":0.00014217937,"about_ca_system_score_gemma":0.00007888589,"threshold_uncertainty_score":0.9999297},"labels":[],"label_agreement":null},{"id":"W3000045075","doi":"10.1007/s40095-019-00330-3","title":"Numerical simulation analysis of the impact of photovoltaic systems and energy storage technologies on centralised generation: a case study for Australia","year":2020,"lang":"en","type":"article","venue":"International journal of energy and environmental engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Photovoltaic system; Renewable energy; Software deployment; Context (archaeology); Greenhouse gas; Environmental economics; Energy storage; Distributed generation; Electricity generation; Computer science; Electric power system; Engineering; Reliability engineering; Systems engineering; Power (physics); Electrical engineering","score_opus":0.019857011535619966,"score_gpt":0.24050471635211362,"score_spread":0.22064770481649365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000045075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9560574,0.00015973147,0.043482322,0.000011105734,0.0002122491,0.000036926234,0.000025048743,0.000012035531,0.00000316791],"genre_scores_gemma":[0.9997455,0.00005575479,0.00008813858,0.00000399505,0.000078882,0.0000055865708,0.0000070982583,0.000011026795,0.000004019502],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993327,0.000012336792,0.0003123554,0.00008411056,0.00018470192,0.000073782365],"domain_scores_gemma":[0.9997112,0.000049891278,0.000116904266,0.000069259804,0.000015543512,0.00003721062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052366042,0.00011284338,0.00020585455,0.00017031058,0.000016296683,0.000015794076,0.00010573413,0.00003691584,0.000005074385],"category_scores_gemma":[0.000015850163,0.00008717563,0.00011641348,0.00012333217,0.000019509425,0.000085935666,0.000031929587,0.000048245394,1.4917932e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027069475,0.000045594956,0.0034797306,0.000008167704,0.00156487,0.000037955157,0.00012526287,0.98038834,0.0139235845,0.000089718145,0.000016771177,0.0002929351],"study_design_scores_gemma":[0.0003996006,0.00017189542,0.0058120755,0.000012815244,0.00016579968,0.000034339966,0.00024838923,0.9898653,0.0031033824,0.0000011211422,0.00011219286,0.00007311042],"about_ca_topic_score_codex":0.00012463846,"about_ca_topic_score_gemma":0.0000045343763,"teacher_disagreement_score":0.043688085,"about_ca_system_score_codex":0.000091994014,"about_ca_system_score_gemma":0.0000028640127,"threshold_uncertainty_score":0.3554919},"labels":[],"label_agreement":null},{"id":"W3000723039","doi":"10.1109/tste.2020.2967428","title":"Spatio-Temporal Flexibility Management in Low-Carbon Power Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Microgrid; Renewable energy; Scheduling (production processes); Wind power; Electric power system; Flexibility (engineering); Electricity generation; Reliability engineering; Mathematical optimization; Distributed computing; Power (physics); Engineering; Electrical engineering","score_opus":0.009397364776037984,"score_gpt":0.19943015675183715,"score_spread":0.19003279197579917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000723039","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08301375,0.00020695197,0.8611388,0.00032068446,0.0016287805,0.00055235595,0.0000071694253,0.0011282744,0.05200322],"genre_scores_gemma":[0.9960094,0.00007709381,0.00011018483,0.00016814047,0.000051334828,0.00031470717,0.000007853997,0.00007641641,0.003184866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981269,0.000059846418,0.0004302407,0.00044474,0.00032944334,0.0006087875],"domain_scores_gemma":[0.9992608,0.00002785126,0.000032786804,0.00045342662,0.000050923558,0.00017420514],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016562022,0.00031036083,0.00028966228,0.00033915916,0.00007323074,0.00007174016,0.00024430582,0.00010965974,0.00010219483],"category_scores_gemma":[0.0000024030348,0.00035415217,0.00009533766,0.0008826793,0.000030848998,0.00019695339,0.000005638681,0.00021923169,0.000019317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006740174,0.0001000841,0.000025894791,0.00036716263,0.000108919114,0.00022723617,0.00015073715,0.99423665,0.000015727395,0.0036225172,0.0005034993,0.0005741549],"study_design_scores_gemma":[0.0014058258,0.00016648998,0.00020330668,0.00007340133,0.000054213444,0.0000025153486,0.0032768839,0.905297,0.0040218183,0.00019406584,0.08456199,0.00074250693],"about_ca_topic_score_codex":0.0008228532,"about_ca_topic_score_gemma":0.00012634836,"teacher_disagreement_score":0.91299564,"about_ca_system_score_codex":0.0006241861,"about_ca_system_score_gemma":0.00002308583,"threshold_uncertainty_score":0.99989104},"labels":[],"label_agreement":null},{"id":"W3001725623","doi":"10.1049/iet-rpg.2019.0992","title":"Stochastic constrained linear quadratic control in a network of smart microgrids","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Quadratic equation; Mathematical optimization; Control theory (sociology); Computer science; Control (management); Mathematics; Artificial intelligence","score_opus":0.012668382767124101,"score_gpt":0.1975813522681203,"score_spread":0.1849129695009962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3001725623","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17135756,0.0009521619,0.82371444,0.0006065061,0.0011719603,0.00050796114,0.000016397897,0.00024327793,0.0014297175],"genre_scores_gemma":[0.99648875,0.000021839218,0.0024846394,0.00039169358,0.0004567928,0.000046438872,0.000040871455,0.000034248125,0.00003472033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988887,0.000046448535,0.00042757337,0.00020493269,0.00016036238,0.0002719995],"domain_scores_gemma":[0.9995983,0.000036181584,0.000052263094,0.00018336093,0.000046486202,0.00008340904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017331203,0.00017508348,0.0002764786,0.000054329248,0.000027277993,0.000024676965,0.00010994723,0.000077517434,0.000081502556],"category_scores_gemma":[0.000042259173,0.00019307608,0.000054266486,0.00034637083,0.000030729818,0.00009679374,0.00001987616,0.000088047345,0.000017369908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021759686,0.000017497705,0.00025526824,0.000027183201,0.000049757815,0.000004284636,0.00018626325,0.95206386,0.040404096,0.00018301596,0.006665164,0.00012182376],"study_design_scores_gemma":[0.0010418525,0.000118359596,0.00014044633,0.000025451309,0.000026278312,9.428056e-7,0.00003701919,0.9891944,0.0058718645,0.000030560706,0.0033252032,0.00018761796],"about_ca_topic_score_codex":0.0000805582,"about_ca_topic_score_gemma":0.00042852026,"teacher_disagreement_score":0.8251312,"about_ca_system_score_codex":0.00004779509,"about_ca_system_score_gemma":0.000036386755,"threshold_uncertainty_score":0.7873414},"labels":[],"label_agreement":null},{"id":"W3001888582","doi":"10.30634/2414-2077.2019.05.06","title":"Comparison of Several Simplistic High-Level Approaches for Estimating the Global Energy and Electricity Use of ICT Networks and Data Centers","year":2019,"lang":"en","type":"article","venue":"International Journal of Green Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Electricity; Computer science; Environmental economics; Energy (signal processing); Data science; Environmental science; Engineering; Statistics; Economics; Mathematics; Electrical engineering; World Wide Web","score_opus":0.06237011192710931,"score_gpt":0.28526456128278493,"score_spread":0.22289444935567562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3001888582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43973202,0.00020336828,0.55926555,0.00030914857,0.0003706513,0.00005084673,0.0000411341,0.000013670207,0.000013636925],"genre_scores_gemma":[0.98093873,0.000031793716,0.018909702,0.00001738206,0.00007340958,0.000001487695,0.000014114332,0.000008191387,0.0000051966763],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926394,0.000012284305,0.0003676995,0.00009777866,0.00015145831,0.00010686377],"domain_scores_gemma":[0.9993329,0.00013850903,0.00024782415,0.00017320692,0.0000899573,0.000017614086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012560385,0.00008656988,0.00022343392,0.00014046673,0.000014141868,0.000015808904,0.0005272871,0.00006691325,0.0000014769289],"category_scores_gemma":[0.00007135942,0.000069512585,0.000024478562,0.00010342385,0.000075999866,0.00013547757,0.00025181758,0.00009818555,3.9488505e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007357715,0.000034772132,0.06758977,0.000032243148,0.00054930744,0.0000022025422,0.00001740171,0.86882854,0.00011408101,0.015913192,0.00045576598,0.046389144],"study_design_scores_gemma":[0.00044542254,0.00009380204,0.014836394,0.000039855546,0.000042186937,0.000047290374,0.00003163439,0.9824897,0.0002025311,0.0012938941,0.0004195614,0.000057736805],"about_ca_topic_score_codex":0.00012707394,"about_ca_topic_score_gemma":0.00008132918,"teacher_disagreement_score":0.5412067,"about_ca_system_score_codex":0.000053079028,"about_ca_system_score_gemma":0.000008091524,"threshold_uncertainty_score":0.2834641},"labels":[],"label_agreement":null},{"id":"W3003691962","doi":"10.1109/pesgm40551.2019.8973951","title":"Multi-Objective Energy Management in a Residential Area with a P2G-Based Storage System","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Mathematical optimization; Energy consumption; Computer science; Integer programming; Power system simulation; Energy management; Electric power system; Linear programming; Scheduling (production processes); Energy storage; Iterative method; Range (aeronautics); Energy management system; Reliability engineering; Energy (signal processing); Power (physics); Engineering; Mathematics","score_opus":0.0053326676530940035,"score_gpt":0.1727891310940889,"score_spread":0.16745646344099488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003691962","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39162347,0.00010666613,0.45269632,0.000042888056,0.0012715084,0.00093472784,0.0000051564757,0.0016208098,0.15169844],"genre_scores_gemma":[0.9925885,0.000004497625,0.0046066353,0.000051161598,0.00003386578,0.00017326372,0.000009603685,0.000058941387,0.0024735362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881446,0.000032477656,0.00021448122,0.00032456746,0.00027546892,0.0003385474],"domain_scores_gemma":[0.9994307,0.000021031372,0.000026914027,0.00044255808,0.000020870815,0.000057924877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011853687,0.00022900551,0.00022214165,0.0003701607,0.000020802834,0.000043835822,0.00018790911,0.00005168621,0.000103149425],"category_scores_gemma":[0.0000011710539,0.00020431213,0.00004369773,0.0003640296,0.000012780005,0.00011454088,0.00006233049,0.00008500945,0.00009026997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051594663,0.000041388197,0.0013878235,0.0002176666,0.0001530017,0.00019571536,0.000054346645,0.9937577,0.00012753952,0.0030163494,0.0007843637,0.00021246629],"study_design_scores_gemma":[0.0029869173,0.00006889654,0.023628749,0.00021239053,0.00003620349,0.0000032274972,0.0007390325,0.9673782,0.0013830364,0.0000030221731,0.0031498736,0.00041042213],"about_ca_topic_score_codex":0.0005491374,"about_ca_topic_score_gemma":0.0018536791,"teacher_disagreement_score":0.600965,"about_ca_system_score_codex":0.00047331944,"about_ca_system_score_gemma":0.000011118356,"threshold_uncertainty_score":0.8331607},"labels":[],"label_agreement":null},{"id":"W3003808304","doi":"10.1109/pesgm40551.2019.8973436","title":"Service Restoration with Active Cold Load Pick-Up Management","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Integer programming; Service (business); Linear programming; Metering mode; Computer science; Load management; Control (management); Operations research; Computer network; Engineering; Business; Electrical engineering; Algorithm","score_opus":0.004816005035099966,"score_gpt":0.16878133128140632,"score_spread":0.16396532624630636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003808304","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46150002,0.000019520729,0.013167268,0.00026579053,0.0010214633,0.00055548945,0.0000013596037,0.00073858385,0.5227305],"genre_scores_gemma":[0.98306257,0.000016560218,0.0017932807,0.0003790265,0.000057792346,0.000060190017,0.000009216083,0.000036027533,0.01458537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993309,0.000007247705,0.000092289454,0.00016285732,0.00023781206,0.00016890754],"domain_scores_gemma":[0.9995792,0.000008566736,0.000014688211,0.00031817364,0.000042880096,0.000036518482],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005330144,0.0001226517,0.00008823283,0.000059100264,0.000020136991,0.00003004683,0.000115187286,0.000028988532,0.0002696997],"category_scores_gemma":[5.415847e-7,0.00010862156,0.000013466755,0.00023830097,0.000004319394,0.0001993699,0.000047279846,0.00005798146,0.000954368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055086846,0.000025757532,0.0005803975,0.00024801487,0.00029727953,0.00001187796,0.0003009426,0.94827664,0.0010752014,0.022617668,0.024034677,0.0024764878],"study_design_scores_gemma":[0.0033032526,0.000202358,0.041953336,0.00014614506,0.0001381097,0.0000036352883,0.002545052,0.17518385,0.024566565,0.000111114336,0.75074553,0.0011010646],"about_ca_topic_score_codex":0.00009228461,"about_ca_topic_score_gemma":0.00053688436,"teacher_disagreement_score":0.77309275,"about_ca_system_score_codex":0.00023019534,"about_ca_system_score_gemma":0.0000064291075,"threshold_uncertainty_score":0.9998235},"labels":[],"label_agreement":null},{"id":"W3004224327","doi":"10.1109/pesgm40551.2019.8973824","title":"Stochastic Demand Response under Random Renewable Power Generation in Smart Grid","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Demand response; Computer science; Smart grid; Renewable energy; Photovoltaic system; Mathematical optimization; Energy storage; Load profile; Peak demand; Electric power system; Schedule; Grid; Reliability engineering; Automotive engineering; Power (physics); Electricity; Engineering; Electrical engineering; Mathematics","score_opus":0.008359891604479789,"score_gpt":0.19428273185541087,"score_spread":0.1859228402509311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004224327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8260419,0.00010008407,0.15988377,0.00014658018,0.0014161349,0.00026330448,9.2978047e-7,0.0001942458,0.011953066],"genre_scores_gemma":[0.9937289,0.000007794891,0.00041075866,0.00014791026,0.00008966554,0.0000312769,0.000012501821,0.000030989948,0.0055402056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992044,0.000054589826,0.00019604522,0.00017648748,0.00014219819,0.00022630765],"domain_scores_gemma":[0.9995752,0.00008182279,0.0000121894145,0.00027464956,0.000013749353,0.000042372623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043475808,0.00012855187,0.00014836405,0.00017189005,0.000018378794,0.000034740006,0.000084335974,0.000056083583,0.00068391947],"category_scores_gemma":[0.000023117631,0.00012353659,0.000031355372,0.0001721709,0.0000074687127,0.00013661532,0.000032205106,0.00006666601,0.00031478345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013649304,0.000010252497,0.00019118677,0.000005343379,0.000020135396,0.0000024950039,0.000045373086,0.97780275,0.00985747,0.000338591,0.011578218,0.0000116714555],"study_design_scores_gemma":[0.003731034,0.000059901377,0.009000496,0.000020151483,0.0000124424,0.000003310228,0.00009064987,0.9684302,0.0045144926,0.00011856185,0.013669401,0.00034935548],"about_ca_topic_score_codex":0.000078392324,"about_ca_topic_score_gemma":0.0003341025,"teacher_disagreement_score":0.167687,"about_ca_system_score_codex":0.00012299753,"about_ca_system_score_gemma":0.000011250245,"threshold_uncertainty_score":0.74884385},"labels":[],"label_agreement":null},{"id":"W3004313315","doi":"10.1109/pesgm40551.2019.8973753","title":"Distributionally Robust Chance-Constrained Energy Management for Islanded Microgrids","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Microgrid; Mathematical optimization; Computer science; Robust optimization; Wind power; Smart grid; Energy management; Moment (physics); Renewable energy; Ambiguity; Distributed generation; Grid; Energy storage; Power (physics); Energy (signal processing); Engineering; Mathematics; Control (management)","score_opus":0.005268863499333601,"score_gpt":0.16854617849841738,"score_spread":0.16327731499908377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004313315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013390556,0.0001243427,0.8320369,0.0002655738,0.0017624461,0.00049952674,0.000061192295,0.0007702374,0.1510892],"genre_scores_gemma":[0.9665347,0.00012229875,0.014155502,0.00028454,0.00028811788,0.00033309407,0.00047045408,0.00005954826,0.017751766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907535,0.0000053800404,0.00019692334,0.00023262225,0.00014048675,0.00034920545],"domain_scores_gemma":[0.9996014,0.000025800975,0.000018080545,0.00027123527,0.00002928827,0.000054181524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000087602304,0.00018073371,0.00015701973,0.00008469121,0.000034896115,0.000036663125,0.00018573338,0.000051216815,0.00048755982],"category_scores_gemma":[0.0000018564801,0.00017792164,0.00009059637,0.00013408234,0.000016463528,0.0000786223,0.000057214853,0.000037818743,0.00009211083],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032738197,0.000067600144,0.00039039165,0.00026538453,0.00057255605,0.0000071326754,0.000017825136,0.5115981,0.001709043,0.39384556,0.07921607,0.012277601],"study_design_scores_gemma":[0.0024178755,0.000076541844,0.0031988067,0.000044183318,0.0000637728,0.0000051686598,0.0000876047,0.25846782,0.0077263904,0.0011053544,0.72612566,0.00068079506],"about_ca_topic_score_codex":0.000007186573,"about_ca_topic_score_gemma":0.000019243724,"teacher_disagreement_score":0.95314413,"about_ca_system_score_codex":0.00010157678,"about_ca_system_score_gemma":0.000005289859,"threshold_uncertainty_score":0.7255434},"labels":[],"label_agreement":null},{"id":"W3004818988","doi":"10.1109/tia.2020.2972203","title":"A New Approach for Estimating Frequency Variations Due to Smart Grid Functions","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Electric power system; Nonlinear system; Power (physics); AC power; Computer science; Grid; Control theory (sociology); Set (abstract data type); Load management; Dynamic demand; Load balancing (electrical power); Engineering; Electrical engineering; Voltage; Mathematics; Control (management)","score_opus":0.028962386665438097,"score_gpt":0.23513991245738988,"score_spread":0.20617752579195178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004818988","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00010136329,0.000005660908,0.98762584,0.002277027,0.0006959336,0.0014758168,0.00037747523,0.0010698971,0.006370986],"genre_scores_gemma":[0.17823435,0.0000023602418,0.80501103,0.0010062592,0.0018918214,0.012060788,0.00017858447,0.00015129626,0.001463513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986104,0.000017115988,0.00038526455,0.00046141152,0.00018481899,0.00034100862],"domain_scores_gemma":[0.99883145,0.00010606272,0.000040726827,0.0005038443,0.0000691117,0.00044879838],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008444008,0.00026306865,0.00021252267,0.0001868332,0.00043974965,0.000080111924,0.00031002206,0.0002555917,0.0003311784],"category_scores_gemma":[0.0000118857015,0.0003220014,0.00012503978,0.0011756626,0.000019007646,0.00017386703,0.0000028428492,0.00059989456,0.00029760372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004934456,0.00007169501,0.0000047707995,0.00004098379,0.00010705728,3.2936188e-7,0.00013223437,0.9548652,0.0005945202,0.0010110608,0.03068727,0.012479942],"study_design_scores_gemma":[0.00068795076,0.00010000232,0.000116880896,0.000022652956,0.0002821703,0.000012062154,0.00026560534,0.9180993,0.0025323257,0.00031997677,0.07687802,0.0006830995],"about_ca_topic_score_codex":0.00006610967,"about_ca_topic_score_gemma":0.000017728833,"teacher_disagreement_score":0.18261482,"about_ca_system_score_codex":0.00016021536,"about_ca_system_score_gemma":0.00007617437,"threshold_uncertainty_score":0.9999232},"labels":[],"label_agreement":null},{"id":"W3005567020","doi":"10.1016/j.epsr.2020.106257","title":"A new measure to evaluate demand response effectiveness and its optimization","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Measure (data warehouse); Demand response; Computer science; Operations research; Mathematical optimization; Engineering; Mathematics; Data mining; Electrical engineering","score_opus":0.0387850419486252,"score_gpt":0.3024262366947531,"score_spread":0.2636411947461279,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005567020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3186326,0.0113639645,0.6624634,0.0009071514,0.0006688107,0.0024892804,0.000002949985,0.000556352,0.0029154907],"genre_scores_gemma":[0.99915427,0.000067319255,0.00013364585,0.000022366383,0.000121433535,0.00015778156,0.0000011704201,0.00005648813,0.0002855228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968624,0.0011586457,0.00020286663,0.0003592392,0.00087732467,0.000539538],"domain_scores_gemma":[0.9988034,0.00032397962,0.000013696767,0.00021764028,0.00022066689,0.0004206441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003661478,0.00016360148,0.00023182729,0.00042826336,0.0001025707,0.00014809282,0.00023338346,0.00008308619,0.00002753261],"category_scores_gemma":[0.000931215,0.00016247218,0.000025382344,0.0019508117,0.0000057524726,0.00012208018,0.00010185735,0.00027554354,0.00014857938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051400694,0.0000056722133,0.000038793856,0.00016920039,0.000083788975,0.000023849956,0.00034208054,0.96505445,0.023387795,0.00009113061,0.009761819,0.0005273903],"study_design_scores_gemma":[0.0008175054,0.00050690136,0.003282971,0.000120190576,0.000012991267,0.0000106358375,0.000037147645,0.97796035,0.0070581185,0.00000431053,0.00993557,0.00025328586],"about_ca_topic_score_codex":0.000038119568,"about_ca_topic_score_gemma":0.000001325001,"teacher_disagreement_score":0.68052167,"about_ca_system_score_codex":0.00027512846,"about_ca_system_score_gemma":0.000099929726,"threshold_uncertainty_score":0.6625423},"labels":[],"label_agreement":null},{"id":"W3005983588","doi":"10.1109/jsyst.2020.2970001","title":"Local Estimation of Critical and Off-Peak Periods for Grid-Friendly Flexible Load Management","year":2020,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Computer science; Identification (biology); Context (archaeology); Load profile; Demand response; Grid; Load management; Load shifting; Real-time computing; Reliability engineering; Electricity; Energy management system; Energy management; Engineering; Energy (signal processing); Electrical engineering","score_opus":0.014854789686782076,"score_gpt":0.24446559555054967,"score_spread":0.2296108058637676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005983588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018323865,0.0012433644,0.974589,0.00034177492,0.003016135,0.0002685663,0.000012056043,0.00012066731,0.002084606],"genre_scores_gemma":[0.9954461,0.0000701461,0.0037047998,0.000036677346,0.0006165694,0.000032530857,0.0000019837912,0.00003317062,0.000058031364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998817,0.000028683908,0.0004401968,0.00014442868,0.00032364344,0.00024602373],"domain_scores_gemma":[0.9995242,0.000043673466,0.000054023196,0.00011662534,0.000084539715,0.00017695976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003151437,0.00014842568,0.00024543403,0.000082727354,0.00007887664,0.00009054758,0.00013131325,0.000051530533,0.000012849425],"category_scores_gemma":[0.00003263424,0.00014534498,0.00006550335,0.000116933326,0.0000550831,0.00017887155,0.000027376362,0.00012474506,0.000009573069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002221468,0.000014123113,0.000017312397,0.0013495308,0.00011054241,0.00002325158,0.00021610461,0.97443897,0.00023585567,0.0012606971,0.016319806,0.0059915953],"study_design_scores_gemma":[0.000744673,0.00017581503,0.00024398457,0.00017405272,0.000087588094,0.00009935325,0.00053701154,0.96663195,0.0007983402,0.00006200037,0.030259902,0.00018534974],"about_ca_topic_score_codex":0.0000069994944,"about_ca_topic_score_gemma":0.0000012848693,"teacher_disagreement_score":0.97712225,"about_ca_system_score_codex":0.00012434408,"about_ca_system_score_gemma":0.000016302421,"threshold_uncertainty_score":0.59269965},"labels":[],"label_agreement":null},{"id":"W3006093126","doi":"10.1109/appeec45492.2019.8994380","title":"Proof of Concept of a Cloud-Based Smart Dual-Fuel Switching System to Control the Operation of a Hybrid Residential HVAC System","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"","keywords":"HVAC; Thermostat; Automotive engineering; Computer science; Cloud computing; Smart grid; Dual (grammatical number); Demand response; Control system; Embedded system; Air conditioning; Real-time computing; Engineering; Electrical engineering; Operating system; Electricity","score_opus":0.004614422300272855,"score_gpt":0.18328783079150598,"score_spread":0.17867340849123314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006093126","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75602955,0.00011490019,0.23486848,0.0000810273,0.0013617459,0.0016165138,0.000023361032,0.0001812744,0.005723136],"genre_scores_gemma":[0.9993726,2.736122e-7,0.00026832422,0.000021939044,0.000103636405,0.00007037398,0.000005416822,0.000032935073,0.00012452132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846405,0.00009944147,0.0006824062,0.0001800069,0.0003854112,0.00018868368],"domain_scores_gemma":[0.99904084,0.00010644533,0.00014167372,0.0005385829,0.00012921912,0.000043223692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005320519,0.00016416053,0.00043934784,0.00012689269,0.0000222805,0.000019696745,0.00022734786,0.000034440138,0.000028516815],"category_scores_gemma":[0.000021915292,0.00012414505,0.00010369549,0.00016108889,0.00001716871,0.00008354797,0.00005014238,0.0000701267,0.000011344276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056436307,0.000017598935,0.00026462486,0.0018945574,0.000155057,0.0000026735315,0.00021518787,0.9732468,0.016624855,0.006850511,0.0006143937,0.000057310066],"study_design_scores_gemma":[0.0013428328,0.00012609872,0.00041656505,0.0004927708,0.00007827661,0.0000039406586,0.00084479124,0.71340895,0.283005,0.0000019774004,0.00014515668,0.00013361289],"about_ca_topic_score_codex":0.00048743695,"about_ca_topic_score_gemma":0.00006983509,"teacher_disagreement_score":0.26638016,"about_ca_system_score_codex":0.00011937239,"about_ca_system_score_gemma":0.000034691817,"threshold_uncertainty_score":0.5062488},"labels":[],"label_agreement":null},{"id":"W3006327149","doi":"10.3390/fi12020037","title":"Global Trends and Advances Towards a Smarter Grid and Smart Cities","year":2020,"lang":"en","type":"article","venue":"Future Internet","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Smart grid; Grid; The Internet; Emerging technologies; Internet of Things; Telecommunications; Power grid; Smart city; Data science; Computer security; Power (physics); World Wide Web; Artificial intelligence; Electrical engineering","score_opus":0.006046753242319043,"score_gpt":0.19420738600201579,"score_spread":0.18816063275969674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006327149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7904284,0.021426484,0.0059410697,0.013321849,0.014611452,0.00021268101,0.00019323842,0.0016605366,0.15220428],"genre_scores_gemma":[0.9942772,0.0004969574,0.0006979085,0.00092319987,0.0030765298,0.000016765869,0.000023621558,0.000023331513,0.00046448447],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99941266,0.0000094518855,0.00012186552,0.00019073662,0.000097892,0.00016741255],"domain_scores_gemma":[0.999781,0.000005673133,0.0000132978585,0.00008878242,0.000008581389,0.000102631566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025823005,0.0001630198,0.00015025864,0.000036168378,0.000013575524,0.00006444948,0.00009806386,0.000048257585,0.00013814887],"category_scores_gemma":[0.0000041030767,0.00014748453,0.000027958538,0.00011503947,0.00003577412,0.00014476677,0.00009559808,0.00007411084,0.000009834279],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007834958,0.000013913497,0.031510413,0.0003795384,0.00032903423,0.000083294515,0.0028126973,0.0023977314,0.000040888845,0.004114094,0.73448294,0.22375709],"study_design_scores_gemma":[0.0002691884,0.000072723844,0.0627248,0.000016438653,0.000020400877,0.000012617601,0.00021211067,0.0068294494,0.000076316515,0.000044024222,0.92953813,0.00018381765],"about_ca_topic_score_codex":0.000023533783,"about_ca_topic_score_gemma":0.0001367746,"teacher_disagreement_score":0.22357327,"about_ca_system_score_codex":0.000024919438,"about_ca_system_score_gemma":0.000002179413,"threshold_uncertainty_score":0.60142446},"labels":[],"label_agreement":null},{"id":"W3006459398","doi":"10.1109/tii.2020.2972803","title":"Optimal Real-Time Energy Management in Apartment Building Integrating Microgrid With Multizone HVAC Control","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; HVAC; Microgrid; Building automation; Building management system; Computer science; Context (archaeology); Distributed generation; Renewable energy; Apartment; Automotive engineering; Air conditioning; Control (management); Engineering; Electricity; Civil engineering","score_opus":0.015379288569467612,"score_gpt":0.20153984219297225,"score_spread":0.18616055362350464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006459398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07661123,0.000009516038,0.9167495,0.0002213826,0.00067909685,0.00064830284,0.000045161894,0.00060628966,0.0044295527],"genre_scores_gemma":[0.9740854,0.00013772903,0.024861032,0.0002759357,0.00021123895,0.00025784635,0.000016640095,0.00007115906,0.000083012514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982403,0.000034644472,0.0007824952,0.00016523407,0.00032949622,0.00044783045],"domain_scores_gemma":[0.9993756,0.00007624781,0.00009620221,0.00024973447,0.00002804085,0.00017417864],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016240044,0.0003531464,0.00036781706,0.0002927515,0.00009644966,0.000100835525,0.00023878217,0.00014918065,0.000068691494],"category_scores_gemma":[0.0000031482432,0.00033590265,0.000084212705,0.0005698346,0.000037077574,0.0003494133,0.0000043854448,0.00045184116,0.000045844252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001633258,0.00005708436,0.000005661991,0.000042698754,0.00031446895,0.000016130922,0.0006583638,0.98127866,0.000403291,0.00010971049,0.0009434986,0.016007135],"study_design_scores_gemma":[0.0051032966,0.000325181,0.0000071139543,0.00015465886,0.00013538428,0.000004771981,0.0008589994,0.96607065,0.017475098,0.0000017643501,0.009397946,0.00046514362],"about_ca_topic_score_codex":0.000070469956,"about_ca_topic_score_gemma":0.000020372845,"teacher_disagreement_score":0.89747417,"about_ca_system_score_codex":0.00031187545,"about_ca_system_score_gemma":0.000021603712,"threshold_uncertainty_score":0.9999093},"labels":[],"label_agreement":null},{"id":"W3007144108","doi":"10.1016/j.esd.2020.01.009","title":"Stand-alone renewable energy auctions: The case of Peru","year":2020,"lang":"en","type":"article","venue":"Energy Sustainable Development/Energy for sustainable development","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Institució Catalana de Recerca i Estudis Avançats","keywords":"Common value auction; Environmental economics; Business; Renewable energy; Electricity; Service (business); Industrial organization; Economics; Marketing; Microeconomics; Engineering","score_opus":0.008700813181302058,"score_gpt":0.1918094353165691,"score_spread":0.18310862213526705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007144108","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020723425,0.01038249,0.92205155,0.0015959508,0.0013035061,0.0014945932,0.000024299872,0.0023060807,0.040118136],"genre_scores_gemma":[0.8540872,0.0007108988,0.015619478,0.0011135801,0.0005597825,0.0039733476,0.0004349641,0.0005205063,0.122980274],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9926324,0.00016849699,0.0020285877,0.0012807878,0.0008229173,0.0030668306],"domain_scores_gemma":[0.99601793,0.00028911032,0.00041681534,0.0010346473,0.0015323476,0.0007091189],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0010426638,0.001272488,0.0011697717,0.0009083021,0.0018889667,0.00034376193,0.0013256873,0.00040102913,0.00021363691],"category_scores_gemma":[0.0002634674,0.0011937885,0.00032005375,0.0029470273,0.00024944576,0.0009582676,0.0010352485,0.00028805976,0.0000070784376],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030135515,0.00024620598,0.000035370416,0.0021486168,0.0016919042,0.005290348,0.004784207,0.64973587,0.00009994678,0.20540217,0.115892634,0.014371384],"study_design_scores_gemma":[0.0017308816,0.00013469349,0.00004275619,0.00006080754,0.00010678105,0.00015725454,0.040351897,0.016678214,0.037721608,0.0017272052,0.8998723,0.001415568],"about_ca_topic_score_codex":0.0040176567,"about_ca_topic_score_gemma":0.0010796125,"teacher_disagreement_score":0.90643203,"about_ca_system_score_codex":0.00244784,"about_ca_system_score_gemma":0.0022475321,"threshold_uncertainty_score":0.99941045},"labels":[],"label_agreement":null},{"id":"W3007849172","doi":"10.1287/ijoc.2019.0904","title":"Transient-State Natural Gas Transmission in Gunbarrel Pipeline Networks","year":2020,"lang":"en","type":"article","venue":"INFORMS journal on computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Compressor station; Mathematical optimization; Computer science; Natural gas; Benchmark (surveying); Gas compressor; Energy consumption; Pipeline (software); Heuristic; Dynamic programming; Markov decision process; Curse of dimensionality; Upper and lower bounds; Mathematics; Engineering; Markov process; Artificial intelligence","score_opus":0.008294573894365017,"score_gpt":0.2002901184201685,"score_spread":0.19199554452580347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007849172","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33853826,0.00057446817,0.65408564,0.0010818805,0.001837529,0.00013675676,5.726967e-7,0.000310527,0.003434403],"genre_scores_gemma":[0.99660474,0.00018086034,0.0014891479,0.0010551913,0.0006106113,6.6349793e-7,0.0000042336706,0.000035991707,0.000018552919],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851143,0.000016845985,0.0006158033,0.00012623583,0.00028384797,0.00044582918],"domain_scores_gemma":[0.9995511,0.00004938866,0.00006764022,0.00008717686,0.000028608698,0.00021607195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027929552,0.000217427,0.00023342363,0.00016004856,0.00008744044,0.00010446908,0.000245482,0.000051884675,0.000023505378],"category_scores_gemma":[0.000016240792,0.00018159796,0.00010968504,0.0003737178,0.000012185694,0.00025057368,0.00002692524,0.0009534324,0.000020754333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003590343,0.0000071387817,0.00014386125,0.000023040862,0.000019013572,0.00008769317,0.00068931,0.83459234,0.000061224666,0.000020455462,0.0015555238,0.16276452],"study_design_scores_gemma":[0.00096158416,0.000059690447,0.001421381,0.00018053621,0.0000062557924,0.000036701975,0.00005372068,0.97409016,0.0001674205,0.000021049584,0.022786267,0.00021523447],"about_ca_topic_score_codex":0.0000024965157,"about_ca_topic_score_gemma":0.0000022472884,"teacher_disagreement_score":0.6580665,"about_ca_system_score_codex":0.00010691456,"about_ca_system_score_gemma":0.000012124037,"threshold_uncertainty_score":0.740535},"labels":[],"label_agreement":null},{"id":"W3008406652","doi":"10.1007/978-3-030-31399-9_2","title":"Comprehensive Modeling of Demand Response Programs","year":2020,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Demand response; Market clearing; Electricity; Computer science; Clearing; Reduction (mathematics); Consumption (sociology); Nonlinear system; Electricity market; Electric power system; Operations research; Mathematical optimization; Environmental economics; Econometrics; Power (physics); Economics; Microeconomics; Engineering; Mathematics","score_opus":0.034008281068250205,"score_gpt":0.20431052697554766,"score_spread":0.17030224590729745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008406652","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00048664786,0.0008678539,0.059741046,0.00008226084,0.0004321652,0.000379118,0.0000071981,0.00074506114,0.93725866],"genre_scores_gemma":[0.5128526,0.0011772476,0.018772388,0.00041082932,0.0008721338,0.00008674674,0.00023101034,0.00086833583,0.46472868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991007,0.000008295236,0.00032084048,0.0002128339,0.00021371174,0.00014362561],"domain_scores_gemma":[0.99949646,0.000034540408,0.000035772162,0.0003037674,0.000057975973,0.00007148298],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005702791,0.00027800948,0.00036834306,0.000111229405,0.000013542314,0.000013898669,0.00016630632,0.00015273022,0.00012520145],"category_scores_gemma":[0.0000041459807,0.00028444346,0.00012328567,0.000026327212,0.00002592013,0.000031229294,0.00010748257,0.00018491413,0.00008894706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071932176,0.0000032331368,7.4177564e-7,0.0002708898,0.00028161178,0.00002596544,0.000046985766,0.97109693,0.00010275677,0.025110202,0.0019105122,0.0010782344],"study_design_scores_gemma":[0.00017229925,0.000058584617,0.0000022982172,0.00013829194,0.00006272612,0.0000018126441,0.000016703641,0.7465187,0.00007978844,0.0012299893,0.25141343,0.00030541743],"about_ca_topic_score_codex":0.000004356693,"about_ca_topic_score_gemma":0.0000032269938,"teacher_disagreement_score":0.512366,"about_ca_system_score_codex":0.000049194146,"about_ca_system_score_gemma":0.000010829179,"threshold_uncertainty_score":0.9999608},"labels":[],"label_agreement":null},{"id":"W3009668591","doi":"10.1016/j.epsr.2020.106275","title":"Positive demand response and multi-hour net benefit test","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Market demand schedule; Derived demand; Peak demand; Economics; Demand management; Demand curve; Load management; Incentive; Demand forecasting; Microeconomics; Electricity; Operations management; Engineering","score_opus":0.030585730594881573,"score_gpt":0.27596213171276224,"score_spread":0.24537640111788067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009668591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9522175,0.014998496,0.020129818,0.0014433591,0.0006290074,0.0014836442,0.00003370418,0.000822133,0.0082423035],"genre_scores_gemma":[0.9978239,0.0001958274,0.00008296358,0.000051855324,0.00013682089,0.000091277136,0.0000037917928,0.000066986206,0.0015465945],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99772626,0.00027223275,0.00026583098,0.00038040645,0.00060865824,0.0007466201],"domain_scores_gemma":[0.9985928,0.0006432572,0.000020560696,0.00028006645,0.00014095161,0.0003223498],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013776104,0.00019549686,0.00025145162,0.00036785915,0.00014761,0.00018139025,0.00028465543,0.00010394109,0.000025326588],"category_scores_gemma":[0.0005672398,0.0001945583,0.000034247987,0.0012248227,0.0000340955,0.00012442189,0.0001441177,0.00047810978,0.00028277468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019216235,0.00042452163,0.016207084,0.0013143687,0.0013685952,0.0019890566,0.007590705,0.2779533,0.32509804,0.0023750265,0.35970247,0.0040552206],"study_design_scores_gemma":[0.0014240851,0.0010204393,0.07271627,0.0001107206,0.00001756696,0.000051481646,0.0003497786,0.8625968,0.0066039944,0.000010621059,0.05453991,0.0005583029],"about_ca_topic_score_codex":0.00012342751,"about_ca_topic_score_gemma":0.0000045076968,"teacher_disagreement_score":0.58464354,"about_ca_system_score_codex":0.00021340752,"about_ca_system_score_gemma":0.000037441605,"threshold_uncertainty_score":0.79338574},"labels":[],"label_agreement":null},{"id":"W3011452552","doi":"10.1109/isgt-europe47291.2020.9248831","title":"Privacy-Cost Management in Smart Meters Using Deep Reinforcement Learning","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"European Commission; Natural Sciences and Engineering Research Council of Canada; McGill University","keywords":"Reinforcement learning; Computer science; Smart grid; Electricity; Occupancy; Battery (electricity); Energy management; Computer security; Deep learning; Information privacy; Energy (signal processing); Artificial intelligence; Engineering; Power (physics)","score_opus":0.024579589175890974,"score_gpt":0.2187404623033756,"score_spread":0.19416087312748462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011452552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08640968,0.00008877457,0.7731046,0.00038867616,0.0005518919,0.00071283156,1.5040487e-7,0.00096785446,0.13777554],"genre_scores_gemma":[0.98829454,0.00007719297,0.010658973,0.00049758237,0.000065814595,0.00004636162,0.000009608544,0.000050857656,0.00029906395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880993,0.000020573123,0.00031287444,0.00024172215,0.00023075062,0.000384167],"domain_scores_gemma":[0.99963707,0.000013624833,0.000023596042,0.00020339484,0.00000829576,0.00011399517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012385608,0.00019812553,0.00017366087,0.00016230387,0.000039565937,0.000047765345,0.00022639167,0.000035827416,0.00028477417],"category_scores_gemma":[0.000012285775,0.00021541562,0.00005252935,0.00040061004,0.000010929944,0.00016124913,0.00023776089,0.00016601337,0.00011953919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064334286,0.000005209002,0.00089927326,0.00008127261,0.00009641163,0.000038485818,0.000304555,0.9935125,0.0002907814,0.0007111982,0.00054191373,0.0035119639],"study_design_scores_gemma":[0.00048167637,0.000019827996,0.0009192659,0.000018769908,0.000024912704,6.9187735e-7,0.00033092173,0.9459144,0.00092012214,0.00000901975,0.051114313,0.00024609],"about_ca_topic_score_codex":0.000037156893,"about_ca_topic_score_gemma":0.000014305775,"teacher_disagreement_score":0.90188485,"about_ca_system_score_codex":0.00022262815,"about_ca_system_score_gemma":0.0000028527445,"threshold_uncertainty_score":0.8784394},"labels":[],"label_agreement":null},{"id":"W3011631033","doi":"10.1109/indicon47234.2019.9030372","title":"An Automatic State Detection Algorithm for Non-intrusive Load Monitoring","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Computer science; MATLAB; State (computer science); Real-time computing; Knowledge base; Energy consumption; Base (topology); Scale (ratio); Energy (signal processing); Data mining; Algorithm; Artificial intelligence; Engineering; Operating system","score_opus":0.004541165085660206,"score_gpt":0.2095632955153198,"score_spread":0.20502213042965958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011631033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4405018,0.000008451027,0.55482674,0.0000036120496,0.0020568767,0.00029708908,0.0000016981822,0.0006032611,0.0017004678],"genre_scores_gemma":[0.96398705,0.00000893968,0.0348423,0.000010292189,0.00027295365,0.00010803386,0.0000029437047,0.00004815585,0.00071935396],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993521,0.0000051941,0.00013668352,0.00014922545,0.00013126081,0.00022554549],"domain_scores_gemma":[0.9996313,0.000023935569,0.000016033582,0.00023804336,0.000038206403,0.000052466443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000097455166,0.000120056815,0.00011110327,0.00006878762,0.000029767047,0.00004403747,0.00009736941,0.00003276144,0.00005270797],"category_scores_gemma":[0.0000032711305,0.00012176354,0.000035452624,0.00009239717,0.0000040034797,0.00021974876,0.000017378497,0.000049857314,0.00016793168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002088453,0.000013233791,0.00024865952,0.00009389905,0.00007778934,0.0000014729817,0.00018739674,0.45012262,0.0136364205,0.000011232385,0.00016005037,0.5354451],"study_design_scores_gemma":[0.00030261814,0.00006622417,0.0027497627,0.000012969285,0.000009615056,7.327932e-7,0.00009681907,0.90954256,0.08578584,0.000053336116,0.0012297978,0.00014972275],"about_ca_topic_score_codex":0.000045868826,"about_ca_topic_score_gemma":0.000016415346,"teacher_disagreement_score":0.5352954,"about_ca_system_score_codex":0.00020228451,"about_ca_system_score_gemma":0.0000063779657,"threshold_uncertainty_score":0.49653733},"labels":[],"label_agreement":null},{"id":"W3011707620","doi":"10.1109/tsg.2020.2979435","title":"Demand Response Cooperative and Demand Charge","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Schedule; Mathematical optimization; Operations research; Electricity market; Electricity; Probabilistic logic; Scheduling (production processes); Computer science; Linear programming; Piecewise linear function; Stochastic optimization; Engineering; Mathematics; Electrical engineering","score_opus":0.01445524530868801,"score_gpt":0.20559825886100455,"score_spread":0.19114301355231655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011707620","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3350428,0.00019542764,0.6589941,0.0016171169,0.0017248259,0.000310172,0.00007071584,0.0006643812,0.0013804793],"genre_scores_gemma":[0.9981278,0.00024575094,0.00026746313,0.00068883493,0.00019435817,0.00007309316,0.000003344073,0.000050807485,0.0003485351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990182,0.000078425015,0.00020755114,0.00028059844,0.00016254406,0.00025270914],"domain_scores_gemma":[0.99945414,0.0001092314,0.000015248799,0.0001909085,0.000026310523,0.00020416678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016144293,0.00022678962,0.00020975129,0.0001044492,0.0001561648,0.000050902025,0.00010027889,0.0000728242,0.0002337263],"category_scores_gemma":[0.000007568467,0.000230142,0.000057789395,0.0002576956,0.0000497159,0.00016682877,0.0000019459624,0.00023274474,0.00024898406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058475614,0.000060909475,0.000069821224,0.00008137985,0.00027223834,0.00004517219,0.0012363427,0.9644968,0.017408561,0.00005827367,0.014343955,0.0013418111],"study_design_scores_gemma":[0.0033671996,0.00076274364,0.0038028485,0.000093312374,0.0002337284,0.000036867485,0.00026989507,0.48622832,0.3011101,0.000014151538,0.20280203,0.0012788086],"about_ca_topic_score_codex":0.0000055362902,"about_ca_topic_score_gemma":0.000012788055,"teacher_disagreement_score":0.663085,"about_ca_system_score_codex":0.000047028767,"about_ca_system_score_gemma":0.000012318993,"threshold_uncertainty_score":0.9384919},"labels":[],"label_agreement":null},{"id":"W3011730150","doi":"10.1109/cdc40024.2019.9029166","title":"A PID controller for Direct Load Control of Thermostatically Controlled Appliances","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; PID controller; Computer science; Automatic Generation Control; Electric power system; Control engineering; Grid; Renewable energy; Controller (irrigation); Electricity; Load regulation; Control system; Automotive engineering; Control theory (sociology); Control (management); Engineering; Power (physics); Temperature control; Voltage; Electrical engineering","score_opus":0.004391623143944244,"score_gpt":0.18953896604487597,"score_spread":0.1851473429009317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011730150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030200263,0.0011818757,0.5092321,0.0003379228,0.0011287333,0.0049339896,0.000041720334,0.00062962837,0.45231378],"genre_scores_gemma":[0.9948025,0.000023117018,0.0012727847,0.00023728459,0.00007700075,0.00051219383,0.0000023898162,0.00003867954,0.003034066],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889195,0.000021136531,0.00039282584,0.00018042156,0.00022308574,0.00029056033],"domain_scores_gemma":[0.998997,0.0005616592,0.00005472557,0.00023118651,0.000102379636,0.000053063406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033746057,0.00018681833,0.00069344183,0.000051235584,0.0000160479,0.000018587014,0.00016843376,0.000053533262,0.0002935442],"category_scores_gemma":[0.000060291295,0.00014156547,0.00018740985,0.000081110506,0.000026777161,0.000062515996,0.0000132060395,0.000046739497,0.00009570811],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0040873764,0.0001872704,0.001637717,0.00059015007,0.0033691246,0.0000024021815,0.000211315,0.84225357,0.06574776,0.054222405,0.016375681,0.011315233],"study_design_scores_gemma":[0.037384283,0.00021303193,0.00047835,0.000030469366,0.00014369692,3.3337648e-7,0.000062644074,0.9080352,0.0042022294,0.00041179304,0.048718516,0.00031943407],"about_ca_topic_score_codex":0.000011434051,"about_ca_topic_score_gemma":0.000009994879,"teacher_disagreement_score":0.96460223,"about_ca_system_score_codex":0.000049273087,"about_ca_system_score_gemma":0.000017194236,"threshold_uncertainty_score":0.5772872},"labels":[],"label_agreement":null},{"id":"W3011864134","doi":"10.5383/juspn.12.02.003","title":"A Scalable Digital Infrastructure for Sustainable Energy Grid Enabled by Distributed Ledger Technology","year":2020,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distributed ledger; Scalability; Sustainable energy; Grid; Computer science; Ledger; Blockchain; Distributed computing; Environmental economics; Business; Database; Electrical engineering; Computer security; Engineering; Renewable energy; Finance; Geology; Economics","score_opus":0.003801615058983421,"score_gpt":0.17203958219049942,"score_spread":0.168237967131516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011864134","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08128444,0.030725868,0.8801372,0.0018863434,0.0034691873,0.00073248334,0.00015487052,0.0003450527,0.001264576],"genre_scores_gemma":[0.9961044,0.0007578235,0.00008463399,0.00012550005,0.0024582045,0.00003643064,0.000050888622,0.000058445898,0.00032366463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.998536,0.000018057064,0.000565969,0.00018908804,0.00017569201,0.000515177],"domain_scores_gemma":[0.9989605,0.00008074234,0.00021494536,0.00014055215,0.00037709414,0.00022616854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014097034,0.00026186407,0.00056207774,0.00012515788,0.00011857973,0.0002729794,0.0002537163,0.0003231376,0.000008655736],"category_scores_gemma":[0.000073129675,0.0002250601,0.00011395448,0.0003914071,0.000046231267,0.00036337995,0.00009413643,0.00035197553,5.663187e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005096562,0.000010968317,0.00052088173,0.00024595644,0.00024731294,0.00007175744,0.000054036514,0.6197464,0.00020849172,0.0009519793,0.37713498,0.00075626094],"study_design_scores_gemma":[0.0010755766,0.00035854036,0.000060030587,0.00010635225,0.00007877886,0.00015902158,0.0014373548,0.1986809,0.00022736183,0.00014502292,0.7973834,0.0002876647],"about_ca_topic_score_codex":0.00001323004,"about_ca_topic_score_gemma":0.0000020202333,"teacher_disagreement_score":0.91481996,"about_ca_system_score_codex":0.00013517955,"about_ca_system_score_gemma":0.00003608429,"threshold_uncertainty_score":0.9177685},"labels":[],"label_agreement":null},{"id":"W3012119204","doi":"10.23977/isspj.2020.51004","title":"A method of electricity consumption behaviour clustering and pricing packages based on data mining","year":2020,"lang":"en","type":"article","venue":"Information Systems and Signal Processing Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cluster analysis; Electricity; Computer science; Consumption (sociology); Subdivision; Data mining; Electricity pricing; Construct (python library); Service (business); Electricity market; Machine learning; Engineering; Business","score_opus":0.039653960006263395,"score_gpt":0.2635868137969125,"score_spread":0.22393285379064912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3012119204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07045981,0.00033819946,0.9286946,0.00004646399,0.00006506396,0.000084189094,0.000006362525,0.000056082994,0.00024924806],"genre_scores_gemma":[0.990155,0.00003514173,0.009622405,0.00007991414,0.00008588147,0.000002448609,0.000009403745,0.000008695949,0.0000011150022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990831,0.000038123184,0.00044521148,0.00007648997,0.00023452804,0.00012253193],"domain_scores_gemma":[0.9995289,0.000049333838,0.00020671812,0.00006661411,0.000062944644,0.00008548175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006417413,0.000105876534,0.00017186438,0.00015486064,0.00012062814,0.00029961157,0.000097187265,0.000041597046,0.0000029459075],"category_scores_gemma":[0.00002318146,0.00009523911,0.000012300186,0.00011978621,0.000011927565,0.001077671,0.000040527015,0.00015170235,6.8432985e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035736375,0.0000057107695,0.005219166,0.0016312818,0.000032199685,0.000003679239,0.0019995174,0.8703138,0.0009699318,0.000013818452,0.00029787244,0.119477265],"study_design_scores_gemma":[0.00037393652,0.000054399163,0.0019570019,0.00036868418,0.000025416393,0.000059369908,0.00051038223,0.99582505,0.0002773782,8.066852e-7,0.00044810225,0.00009948354],"about_ca_topic_score_codex":0.000005365186,"about_ca_topic_score_gemma":3.2361703e-7,"teacher_disagreement_score":0.9196952,"about_ca_system_score_codex":0.000027199103,"about_ca_system_score_gemma":0.00002002656,"threshold_uncertainty_score":0.38837382},"labels":[],"label_agreement":null},{"id":"W3013032741","doi":"10.5383/juspn.08.02.004","title":"Complex system modeling and platform implementation for financial risk management in energy markets","year":2017,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Risk management; Nash equilibrium; Computer science; Government (linguistics); Game theory; System dynamics; General partnership; Financial modeling; Risk analysis (engineering); Finance; Business; Economics; Microeconomics","score_opus":0.01937903527095109,"score_gpt":0.24399595943327987,"score_spread":0.22461692416232878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013032741","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6478743,0.0061365473,0.34009188,0.00003322828,0.0037038974,0.0006339409,0.000022386515,0.000042968928,0.0014608334],"genre_scores_gemma":[0.99460995,0.0035416258,0.0006690666,0.000012954404,0.0010689826,0.000045418954,0.0000054547736,0.000028933493,0.00001759478],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987531,0.000031556105,0.0006159172,0.00014692133,0.000167457,0.00028508087],"domain_scores_gemma":[0.99922955,0.000052648662,0.0003598587,0.00018578288,0.000083348146,0.00008879804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006849949,0.00018434749,0.00037944515,0.00015616525,0.00027455852,0.00022645961,0.00017606918,0.00008670624,0.0000014906761],"category_scores_gemma":[0.000008879398,0.00017034955,0.00006722322,0.000036250032,0.00001828302,0.0002688503,0.00007762932,0.00012638565,1.05714854e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007508556,0.000007502497,0.0018245876,0.00045259853,0.00015664313,0.000046486726,0.00013463496,0.9654076,0.0000073761075,0.003237944,0.0018451157,0.026804393],"study_design_scores_gemma":[0.0015686653,0.000083855586,0.0108906785,0.00038288106,0.000091669885,0.00006983739,0.0012915957,0.9807168,0.000003612239,0.000078172525,0.004647121,0.00017509267],"about_ca_topic_score_codex":0.00028372402,"about_ca_topic_score_gemma":0.0004263855,"teacher_disagreement_score":0.34673566,"about_ca_system_score_codex":0.00014662175,"about_ca_system_score_gemma":0.00000937196,"threshold_uncertainty_score":0.6946653},"labels":[],"label_agreement":null},{"id":"W3013158530","doi":"10.1016/j.energy.2020.118500","title":"Smart Distributed Energy Storage Controller (smartDESC)","year":2020,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Hydro-Québec; Australian Government","keywords":"Computer science; Controller (irrigation); Renewable energy; Scalability; Distributed computing; Energy storage; Anticipation (artificial intelligence); Scale (ratio); Architecture; Smart grid; Power (physics); Engineering; Electrical engineering","score_opus":0.008203547721477066,"score_gpt":0.1662015919873614,"score_spread":0.15799804426588432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013158530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075414693,0.0013614569,0.93904215,0.0016464237,0.0019830144,0.000087268156,0.000072189876,0.002563779,0.045702267],"genre_scores_gemma":[0.9959714,0.00013532503,0.00023704155,0.0017550015,0.00075440545,0.000067347006,0.00015074215,0.000088565284,0.0008402189],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986356,0.000042892396,0.00029796117,0.00031884768,0.00025896358,0.0004457588],"domain_scores_gemma":[0.9993255,0.000045054596,0.000034529396,0.00028462533,0.00003201688,0.00027825215],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000584685,0.0002952234,0.00032162396,0.00007217605,0.000064248234,0.000055582783,0.00029587382,0.000101178055,0.00031040574],"category_scores_gemma":[0.000030071164,0.00030695988,0.0001247123,0.00036634493,0.00003277129,0.00012789313,0.00010493255,0.00011071025,0.00007882525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035252076,0.000024385175,0.00006316095,0.00001825949,0.00020771059,0.00006744974,0.000050437746,0.8085388,0.0021106545,0.030517058,0.15431966,0.004047187],"study_design_scores_gemma":[0.0006067689,0.00004012227,0.00026686687,0.0000055480186,0.00002074758,0.0000015670639,0.000016485183,0.30793962,0.0025068875,0.00009953781,0.6882252,0.0002706494],"about_ca_topic_score_codex":0.0001384085,"about_ca_topic_score_gemma":0.000059787577,"teacher_disagreement_score":0.9884299,"about_ca_system_score_codex":0.00009941288,"about_ca_system_score_gemma":0.000012023062,"threshold_uncertainty_score":0.99993825},"labels":[],"label_agreement":null},{"id":"W3013357131","doi":"10.1109/access.2020.2982398","title":"A Practical Approach to Residential Appliances on-Line Anomaly Detection: A Case Study of Standard and Smart Refrigerators","year":2020,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Anomaly detection; Computer science; Anomaly (physics); Energy consumption; Set (abstract data type); Energy (signal processing); Construct (python library); Reliability engineering; Data mining; Real-time computing; Engineering","score_opus":0.07638163504817307,"score_gpt":0.3263094547186329,"score_spread":0.2499278196704598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013357131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9309796,0.00001528516,0.066974446,0.00011949692,0.0003726336,0.00044456936,0.0000044474737,0.00014102673,0.00094849936],"genre_scores_gemma":[0.9986453,0.000005285426,0.00077973516,0.00009925186,0.00032224774,0.00011112165,5.879113e-7,0.000028304508,0.000008152063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989723,0.000038884362,0.0002549763,0.00030034,0.00026977793,0.00016370034],"domain_scores_gemma":[0.99953216,0.000041677242,0.000037400798,0.00021435852,0.000031171032,0.00014323198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013284804,0.00015220177,0.0002253624,0.00009305999,0.00006376775,0.00011247745,0.0001427325,0.000040027215,0.0000068590316],"category_scores_gemma":[0.000034031214,0.0001483265,0.000022354625,0.00042246966,0.000018928067,0.0002361298,0.00008384051,0.00013889455,0.0000046077985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011373447,0.0006462489,0.007503134,0.0005421668,0.0006931791,0.0029941578,0.004254464,0.9593935,0.0013890229,0.00009043954,0.014069695,0.0072866604],"study_design_scores_gemma":[0.018215794,0.016215047,0.015516863,0.0002232061,0.001353509,0.0017128142,0.03015129,0.60631883,0.24991319,0.00010394321,0.05586257,0.004412978],"about_ca_topic_score_codex":0.00025493331,"about_ca_topic_score_gemma":0.0004891446,"teacher_disagreement_score":0.35307467,"about_ca_system_score_codex":0.000035758665,"about_ca_system_score_gemma":0.000011182241,"threshold_uncertainty_score":0.60485786},"labels":[],"label_agreement":null},{"id":"W3014199492","doi":"10.1016/j.enbuild.2020.110027","title":"Towards standardising market-independent indicators for quantifying energy flexibility in buildings","year":2020,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Horizon 2020; Ministerio de Economía y Competitividad; Science Foundation Ireland; European Commission","keywords":"Flexibility (engineering); Robustness (evolution); Smart grid; Environmental economics; Computer science; Grid; Energy market; Risk analysis (engineering); Efficient energy use; Reliability engineering; Engineering; Electricity; Business; Economics; Mathematics","score_opus":0.02073577579565725,"score_gpt":0.24145359643086103,"score_spread":0.2207178206352038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3014199492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6240611,0.0016196009,0.36561978,0.0008028661,0.00077189977,0.00017603395,0.000030853284,0.0006410146,0.0062768534],"genre_scores_gemma":[0.99343204,0.00039032783,0.0051196846,0.00055220025,0.0002757988,0.000069316935,0.00001629537,0.000074962605,0.000069385445],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99808633,0.000036380232,0.00044861733,0.00058025,0.00030853646,0.00053988374],"domain_scores_gemma":[0.99937034,0.000085940825,0.00006686955,0.00021708908,0.000027418046,0.00023234704],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004604039,0.0003360278,0.000403031,0.00028762754,0.00012676821,0.00011187197,0.0002650736,0.00016658599,0.000059665555],"category_scores_gemma":[0.00008429767,0.00035677638,0.00011165362,0.0005314914,0.000061585015,0.00027281718,0.00018397026,0.00015081973,4.8980417e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067721587,0.00013478778,0.011232623,0.00090550986,0.0005649904,0.00009890477,0.002018391,0.38183597,0.015907865,0.31690532,0.020766757,0.24895166],"study_design_scores_gemma":[0.0020235335,0.00015926381,0.003446677,0.00013980278,0.000068469395,0.00000714362,0.00040205684,0.120483026,0.06715248,0.0023370336,0.8026872,0.0010933046],"about_ca_topic_score_codex":0.00018508236,"about_ca_topic_score_gemma":0.00009725489,"teacher_disagreement_score":0.78192043,"about_ca_system_score_codex":0.00018027115,"about_ca_system_score_gemma":0.000028065338,"threshold_uncertainty_score":0.9998884},"labels":[],"label_agreement":null},{"id":"W3015731235","doi":"10.3390/en13071813","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Energy storage; Prosumer; Computer science; Mathematical optimization; Grid; Electricity; Reliability engineering; Environmental economics; Engineering; Power (physics); Production (economics); Electrical engineering; Economics; Mathematics; Microeconomics","score_opus":0.027369907741307327,"score_gpt":0.20839596379554706,"score_spread":0.18102605605423974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015731235","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51393133,0.0015985108,0.48184505,0.000054714994,0.0003550808,0.0002397806,0.000024712597,0.0009153,0.0010355056],"genre_scores_gemma":[0.9864053,0.000023552326,0.012724808,0.0001555227,0.00021716038,0.00026260177,0.000048684542,0.00008405499,0.00007833036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896735,0.000016511707,0.00020583847,0.00030690123,0.00014605545,0.00035734067],"domain_scores_gemma":[0.9995483,0.00009795309,0.000034566372,0.00015746165,0.00003130036,0.00013039199],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007710051,0.0002582506,0.00025923108,0.00010464041,0.00009941653,0.00009106667,0.00013447068,0.0000678808,0.000006405969],"category_scores_gemma":[0.000066949426,0.00027830093,0.00003643624,0.00024539407,0.000055513083,0.00017298822,0.000105114545,0.00010548776,0.0000010462601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021942446,0.0000055344613,0.000027338254,0.00015143519,0.00011981993,0.000009041053,0.0010928329,0.9903976,0.003897899,0.0010418434,0.0030448353,0.00018988053],"study_design_scores_gemma":[0.00059499854,0.00006441419,0.00011759047,0.000034638415,0.00004777323,0.000006429164,0.0013366472,0.97168773,0.0031063773,0.000024501427,0.022606555,0.00037231363],"about_ca_topic_score_codex":0.000025242169,"about_ca_topic_score_gemma":0.0000030103815,"teacher_disagreement_score":0.47247395,"about_ca_system_score_codex":0.000043923923,"about_ca_system_score_gemma":0.000020366087,"threshold_uncertainty_score":0.9999669},"labels":[],"label_agreement":null},{"id":"W3016029633","doi":"10.1109/iciis47346.2019.9063281","title":"Use of Probabilistic Fuzzy Inference Systems to Model Demand Response in the Off-grid Power Systems of Northern Canada","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro; Research Manitoba","keywords":"Probabilistic logic; Demand response; Computer science; Grid; Fuzzy logic; Operations research; Process (computing); Electric power system; Inference; Load management; Power demand; Distributed computing; Real-time computing; Power (physics); Engineering; Artificial intelligence; Power consumption; Electricity; Geography","score_opus":0.015319805949635324,"score_gpt":0.19407456081213115,"score_spread":0.1787547548624958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016029633","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934597,0.00009152631,0.0031776095,0.000033182296,0.0005785712,0.0007223452,0.000024786958,0.000031741834,0.0018805119],"genre_scores_gemma":[0.99934906,0.000003879808,0.000059955277,0.000023952754,0.000009548836,0.00006106374,0.000002404491,0.000020603258,0.00046954316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987599,0.000105485226,0.0004252869,0.0001517175,0.0003491722,0.00020838385],"domain_scores_gemma":[0.99888307,0.00034819616,0.00005012217,0.0005886379,0.00008480361,0.000045169923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048681104,0.00014253022,0.00026869454,0.0001087422,0.00000906742,0.000024503288,0.00028087982,0.00003974397,0.000005135578],"category_scores_gemma":[0.000118641205,0.000103357685,0.000023388098,0.00025438605,0.000011905356,0.000077961784,0.000053844236,0.00007194012,0.0000064923056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058105707,0.000013786233,0.008469455,0.0002672992,0.000027386779,0.0000032249873,0.00029661413,0.9874665,0.00047257644,0.0017734676,0.0011478018,0.000003796764],"study_design_scores_gemma":[0.00016719417,0.00006269662,0.014831574,0.00017375057,0.000011248237,0.0000016636441,0.00047931317,0.98258424,0.00006573774,0.0000054965035,0.0014514454,0.00016565621],"about_ca_topic_score_codex":0.22457644,"about_ca_topic_score_gemma":0.35534358,"teacher_disagreement_score":0.13076714,"about_ca_system_score_codex":0.0002021255,"about_ca_system_score_gemma":0.00012855021,"threshold_uncertainty_score":0.78058714},"labels":[],"label_agreement":null},{"id":"W3016141087","doi":"10.1109/tsg.2020.2986337","title":"A New and Fair Peer-to-Peer Energy Sharing Framework for Energy Buildings","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Science and Technology Project of State Grid; National Natural Science Foundation of China","keywords":"Payment; Environmental economics; Energy consumption; Energy management; Computer science; Efficient energy use; Peer-to-peer; Sustainable development; Nash equilibrium; Game theory; Sharing economy; Energy (signal processing); Microeconomics; Distributed computing; Economics; Engineering","score_opus":0.018107614150469298,"score_gpt":0.22594865624892135,"score_spread":0.20784104209845206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016141087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019442318,0.00006504664,0.9872623,0.0062018945,0.0028521256,0.00015285055,0.00004705911,0.0007675782,0.0007068769],"genre_scores_gemma":[0.90805477,0.00013951203,0.0807145,0.0044379695,0.00214165,0.0004053373,0.00002139883,0.0002601469,0.0038247344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982479,0.000010989781,0.00031449329,0.0005517955,0.00039812614,0.00047665153],"domain_scores_gemma":[0.99892825,0.00011928132,0.000027685759,0.0003503835,0.000079334204,0.0004950413],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000101657635,0.00035380496,0.00031074494,0.00021538415,0.00016328698,0.00012654351,0.00029963197,0.00016286857,0.00013014482],"category_scores_gemma":[0.000019982688,0.00040170486,0.00015404008,0.00046760417,0.000019337542,0.00018915659,0.000008050977,0.00023717727,0.000028800134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010661071,0.000035594087,0.000017780581,0.0000782041,0.00029284364,0.000009025509,0.0005834329,0.86591166,0.0016775702,0.0104225585,0.08247829,0.038386405],"study_design_scores_gemma":[0.0006391266,0.000208837,0.000047193058,0.00006675546,0.000099341334,0.000005518974,0.0000697024,0.0900323,0.038889274,0.0009148448,0.8684426,0.00058453873],"about_ca_topic_score_codex":0.0002522626,"about_ca_topic_score_gemma":0.00013888942,"teacher_disagreement_score":0.90654784,"about_ca_system_score_codex":0.000097454074,"about_ca_system_score_gemma":0.000018687151,"threshold_uncertainty_score":0.9998435},"labels":[],"label_agreement":null},{"id":"W3016777092","doi":"10.1007/978-981-15-4412-5_3","title":"Intelligent Transmission Scheduling Based on Deep Reinforcement Learning","year":2020,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reinforcement learning; Computer science; Scheduling (production processes); Artificial intelligence; Distributed computing; Engineering; Operations management","score_opus":0.015147032179914914,"score_gpt":0.20844313808553241,"score_spread":0.1932961059056175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016777092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00003674279,0.00009622536,0.8631527,0.000113279144,0.0013187241,0.00024544896,1.6248822e-7,0.0004191355,0.13461758],"genre_scores_gemma":[0.87128645,0.00047254298,0.11997766,0.0015820912,0.0014026341,0.000050978448,0.000023976258,0.00034681003,0.0048568742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971338,0.000011637397,0.00054167095,0.000835516,0.00095468754,0.00052268297],"domain_scores_gemma":[0.9990105,0.00006553995,0.00008565646,0.00054499897,0.00004840455,0.0002448743],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005146876,0.0004963927,0.00038634194,0.0006678195,0.00014316554,0.00017252604,0.00092722423,0.00014610066,0.00015868171],"category_scores_gemma":[0.000015874088,0.00054270326,0.00012873115,0.00028977098,0.00016203588,0.00015646541,0.00030220664,0.000903335,0.00015061913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071455333,0.000005739324,0.000007164317,0.00011415558,0.000011386891,0.00005340749,0.00009178009,0.9203953,0.000052002204,0.012544509,0.000019039331,0.066698365],"study_design_scores_gemma":[0.00018143783,0.00012278529,0.00002942227,0.00068571797,0.000009471138,0.0000010691646,0.0000013369049,0.9496982,0.0012854376,0.0003156356,0.04715456,0.00051493105],"about_ca_topic_score_codex":0.000004973624,"about_ca_topic_score_gemma":0.0000025300646,"teacher_disagreement_score":0.8712497,"about_ca_system_score_codex":0.0006270624,"about_ca_system_score_gemma":0.00008319428,"threshold_uncertainty_score":0.99970245},"labels":[],"label_agreement":null},{"id":"W3018966580","doi":"10.1109/isc246665.2019.9071651","title":"Scheduling Electric Vehicles to Chargers through Iterative Double Auction Mechanism","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Double auction; Computer science; Scheduling (production processes); Combinatorial auction; Iterative method; Schedule; Auction algorithm; Mathematical optimization; Auction theory; Common value auction; Revenue equivalence; Algorithm; Microeconomics","score_opus":0.010661788549094844,"score_gpt":0.2117862235324769,"score_spread":0.20112443498338206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018966580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76547635,0.000050019644,0.19521725,0.00020859437,0.0012696785,0.00033121352,4.2906117e-7,0.0007179035,0.03672853],"genre_scores_gemma":[0.9902438,0.000023680665,0.007262586,0.00024755084,0.00015579462,0.000044799483,0.0000043017376,0.000035703197,0.0019818163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992594,0.0000070623155,0.0001313641,0.00019505688,0.00014315182,0.00026396793],"domain_scores_gemma":[0.9997178,0.000011525751,0.000011843843,0.0001903317,0.00002392214,0.00004460189],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007702886,0.000135368,0.00012025848,0.00011586434,0.000036735273,0.00004898841,0.00009966868,0.000045521294,0.000310494],"category_scores_gemma":[0.0000025102765,0.00013415507,0.000036663794,0.00035933187,0.0000020809098,0.00026640622,0.000022567376,0.00008701946,0.0012732983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000118073485,0.000010052255,0.00006153278,0.000025660249,0.000067024564,0.0000013112779,0.00037767767,0.80543876,0.13456817,0.0577919,0.0012388637,0.00040724297],"study_design_scores_gemma":[0.00056515465,0.0000731055,0.0002648634,0.000023280398,0.000013714058,0.0000018073562,0.00019506818,0.2648151,0.72075397,0.0010662349,0.011871307,0.0003564402],"about_ca_topic_score_codex":0.000035835234,"about_ca_topic_score_gemma":0.000005421501,"teacher_disagreement_score":0.58618575,"about_ca_system_score_codex":0.0001248557,"about_ca_system_score_gemma":0.0000047753692,"threshold_uncertainty_score":0.9995043},"labels":[],"label_agreement":null},{"id":"W3019529411","doi":"10.1109/pesgre45664.2020.9070711","title":"Stochastic Optimization for Residential Demand Response under Time of Use","year":2020,"lang":"en","type":"article","venue":"2020 IEEE International Conference on Power Electronics, Smart Grid and Renewable Energy (PESGRE2020)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Demand response; Computer science; News aggregator; Renewable energy; Load shifting; Tariff; Mathematical optimization; Peak demand; Operations research; Electricity; Electric power system; Stochastic modelling; Energy consumption; Reliability engineering; Power (physics); Engineering; Economics; Electrical engineering","score_opus":0.0172520821095088,"score_gpt":0.22571707337863464,"score_spread":0.20846499126912585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3019529411","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037059452,0.0004468128,0.95218587,0.0038459902,0.0036295468,0.0003396986,0.00019144447,0.00031159114,0.0019895963],"genre_scores_gemma":[0.99405086,0.0007745587,0.0012113779,0.00065996486,0.0006918007,0.00006984771,0.00024975743,0.00008414843,0.0022076915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981205,0.00007836272,0.00049779296,0.00049270265,0.00040274614,0.0004079313],"domain_scores_gemma":[0.99902797,0.00019957004,0.00013399696,0.00022691605,0.00023118274,0.00018038834],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020221458,0.000334589,0.00035764676,0.00017535152,0.00008540848,0.00013768698,0.00034873065,0.0001438031,0.00033560625],"category_scores_gemma":[0.00011767786,0.00035130896,0.00012101244,0.00020752705,0.000072031275,0.0002878865,0.000074710966,0.00016202868,0.0000111740155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010068138,0.00003383662,0.000010674456,0.000021318729,0.00030100602,0.0000057136303,0.00007794131,0.9281628,0.012250844,0.0033144383,0.054781895,0.000032696807],"study_design_scores_gemma":[0.0011486576,0.00052664895,0.0000763989,0.00006518326,0.00006624832,0.0000069378198,0.000040754538,0.96636313,0.0113349175,0.0004662596,0.019496301,0.00040858876],"about_ca_topic_score_codex":0.00007455188,"about_ca_topic_score_gemma":0.00010096999,"teacher_disagreement_score":0.9569914,"about_ca_system_score_codex":0.00014723417,"about_ca_system_score_gemma":0.00013024757,"threshold_uncertainty_score":0.9998939},"labels":[],"label_agreement":null},{"id":"W3020452024","doi":"10.1109/epec47565.2019.9074794","title":"Locational Marginal Pricing for Distribution Networks: Review and Applications","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Distribution (mathematics); Computer science; Computer network; Mathematics","score_opus":0.004117325955123115,"score_gpt":0.1935815959784452,"score_spread":0.18946427002332208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020452024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001866329,0.003875282,0.9912126,0.00022194424,0.000075641816,0.0005899928,0.000007132562,0.000114922266,0.0037158744],"genre_scores_gemma":[0.96671075,0.011211574,0.010828152,0.0014758683,0.0008213199,0.0028289822,0.0020289267,0.00007206997,0.004022389],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997011,0.000002304038,0.00008687139,0.00008404135,0.000037981572,0.00008773696],"domain_scores_gemma":[0.9998212,0.0000244485,0.000009586822,0.00010296976,0.000021053904,0.000020771691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000076574055,0.000051751682,0.000067410714,0.000010692021,0.00002184812,0.000009836465,0.0000392849,0.000014653651,0.00005889466],"category_scores_gemma":[0.0000026122282,0.000050380833,0.000013986064,0.00008137236,0.000004980301,0.000049006852,0.000014000135,0.000023483664,0.000018018707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017746117,0.0000128299425,0.0011601748,0.0020771683,0.000060193837,5.294723e-8,0.0000026713758,0.74686766,0.000025071431,0.16290279,0.07049097,0.016398638],"study_design_scores_gemma":[0.0001343074,0.000007982014,0.0058217016,0.000076769196,0.000045372555,0.0000013943425,0.000004338133,0.36824933,0.000017629502,0.0001633444,0.62536466,0.00011317289],"about_ca_topic_score_codex":0.0000015273997,"about_ca_topic_score_gemma":0.0000013392837,"teacher_disagreement_score":0.9803844,"about_ca_system_score_codex":0.000035993537,"about_ca_system_score_gemma":0.0000024129145,"threshold_uncertainty_score":0.20544708},"labels":[],"label_agreement":null},{"id":"W3020812033","doi":"10.1109/epec47565.2019.9074814","title":"Optimal Prosumer Asset Planning Considering Energy Storage and PV Units","year":2019,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Prosumer; Energy storage; Asset (computer security); Photovoltaic system; Computer science; Environmental economics; Renewable energy; Electrical engineering; Engineering; Economics; Computer security","score_opus":0.012774868170095982,"score_gpt":0.1948732361399803,"score_spread":0.18209836796988432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020812033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9194851,0.00030493326,0.029486638,0.000028989616,0.0005887926,0.00008489111,0.0000018757271,0.0005375747,0.049481217],"genre_scores_gemma":[0.9951812,0.000017507738,0.00244317,0.00008809092,0.00005281965,0.000012762349,0.0000090137255,0.000038338934,0.002157101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993677,0.0000096647755,0.00012095617,0.00016346687,0.00010623924,0.0002319487],"domain_scores_gemma":[0.999693,0.000034687753,0.000012488288,0.00018177372,0.000016483691,0.00006156909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070070135,0.00014019193,0.00013088106,0.000090388654,0.00002744577,0.000052151812,0.00006802445,0.000046293324,0.00017096795],"category_scores_gemma":[0.0000065551612,0.0001403379,0.00001258999,0.00012676528,0.000013324723,0.00015344447,0.00008402819,0.00007605387,0.000033805165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025023505,0.0000029641017,0.004235021,0.000037579368,0.00005521753,0.000018600571,0.00009584416,0.98677504,0.0014358329,0.002953266,0.0039975573,0.00039057876],"study_design_scores_gemma":[0.00056792627,0.000041183008,0.005421527,0.000055447013,0.000018604253,0.00001936693,0.0003324371,0.8291198,0.006169884,0.000023774368,0.15776418,0.00046589147],"about_ca_topic_score_codex":0.000025895168,"about_ca_topic_score_gemma":0.0000049783357,"teacher_disagreement_score":0.15765527,"about_ca_system_score_codex":0.00002997013,"about_ca_system_score_gemma":0.0000066214075,"threshold_uncertainty_score":0.57228136},"labels":[],"label_agreement":null},{"id":"W3020843673","doi":"10.1109/mcom.001.2000263","title":"Holistic Privacy for Electricity, Water, and Natural Gas Metering in Next Generation Smart Homes","year":2021,"lang":"en","type":"preprint","venue":"IEEE Communications Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electricity; Computer security; Metering mode; Smart meter; Environmental economics; Scarcity; Computer science; Natural resource; Smart grid; Information privacy; Engineering; Electrical engineering","score_opus":0.07612062575871383,"score_gpt":0.2870588466614142,"score_spread":0.21093822090270037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020843673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9391567,0.013388424,0.040709324,0.001178616,0.003170507,0.001151631,0.000024229783,0.00045912433,0.0007614212],"genre_scores_gemma":[0.96656644,0.007981293,0.022631181,0.000050075716,0.00023007189,0.0007063547,0.0015891525,0.000076607495,0.0001687944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986265,0.000095759635,0.00047076636,0.00034026025,0.00012987938,0.0003368368],"domain_scores_gemma":[0.9977141,0.0001289991,0.000056797715,0.0019428538,0.000104574225,0.00005266077],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029181436,0.00031298143,0.00038593245,0.00038457333,0.00011607763,0.00031836133,0.0008680517,0.0001473834,0.0000074256654],"category_scores_gemma":[0.00007266128,0.0003288567,0.00008511908,0.00020533142,0.000049534858,0.00019887833,0.0012949348,0.000575117,0.0000069553953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000227674,0.0003119424,0.00061228144,0.0020750095,0.0006871363,0.000016287308,0.0019190635,0.6383147,0.31690025,0.001077078,0.006952158,0.031111306],"study_design_scores_gemma":[0.0004900621,0.000018027164,0.0020269174,0.0001538094,0.0000973784,0.000008348711,0.000027434236,0.97219944,0.0076649836,0.00037679938,0.016435672,0.00050115155],"about_ca_topic_score_codex":0.00005861701,"about_ca_topic_score_gemma":0.0007175675,"teacher_disagreement_score":0.3338847,"about_ca_system_score_codex":0.0002716641,"about_ca_system_score_gemma":0.000024724362,"threshold_uncertainty_score":0.9999164},"labels":[],"label_agreement":null},{"id":"W3021677206","doi":"10.1049/iet-rpg.2019.0606","title":"Co‐designed Incentives for an Aimed Renewable Energy Contribution and Volunteer Load Shedding","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Load Shedding; Incentive; Renewable energy; Volunteer; Environmental economics; Business; Computer science; Engineering; Electrical engineering; Economics; Microeconomics; Electric power system; Physics; Power (physics)","score_opus":0.016560812146690803,"score_gpt":0.22736333869851838,"score_spread":0.21080252655182757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021677206","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07027403,0.0010253662,0.9238735,0.00030213737,0.0008905345,0.00043110893,0.000037257807,0.00051680853,0.0026492686],"genre_scores_gemma":[0.9936667,0.00017354867,0.0036636798,0.00045557725,0.0007106522,0.00017707271,0.0005088341,0.00006572607,0.0005782112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985342,0.00005917626,0.00032733148,0.00044218858,0.0002527782,0.00038431972],"domain_scores_gemma":[0.9993243,0.000034822664,0.00006186273,0.00023173308,0.00015712406,0.00019011524],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002768091,0.00026072623,0.0002577948,0.00007966973,0.00018852045,0.000189033,0.000127992,0.00013054119,0.000057832814],"category_scores_gemma":[0.00007600359,0.0002901783,0.000054608936,0.00020394848,0.000030754545,0.0005760426,0.000027914422,0.00005011108,0.0000050569924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049069215,0.000017371633,0.00013141401,0.000019871804,0.000060833143,0.0000011987734,0.00024791638,0.5813455,0.36271617,0.0004081814,0.05473363,0.0002688483],"study_design_scores_gemma":[0.00085603376,0.00017679029,0.000063627645,0.000010097818,0.000032181466,0.0000010022106,0.000060900857,0.529804,0.31202158,0.00008622769,0.15661578,0.00027181438],"about_ca_topic_score_codex":0.00054793636,"about_ca_topic_score_gemma":0.00097146764,"teacher_disagreement_score":0.92339265,"about_ca_system_score_codex":0.00016454027,"about_ca_system_score_gemma":0.000039616174,"threshold_uncertainty_score":0.99995506},"labels":[],"label_agreement":null},{"id":"W3021984236","doi":"10.1109/isgt45199.2020.9087733","title":"Increasing the Accuracy and Speed of Universal Non-Intrusive Load Monitoring (UNILM) Using a Novel Real- Time Steady-State Block Filter","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Block (permutation group theory); Computer science; Transient (computer programming); Filter (signal processing); Noise (video); SIGNAL (programming language); Real-time computing; Representation (politics); Energy (signal processing); Field (mathematics); Track (disk drive); Moving average; Smart meter; Electricity; Artificial intelligence; Engineering; Computer vision; Mathematics","score_opus":0.019222425840504903,"score_gpt":0.21736872876956614,"score_spread":0.19814630292906124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021984236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.987877,0.000025478195,0.0039127977,0.00016103002,0.00017247513,0.00017881602,0.000007648467,0.00016066292,0.007504092],"genre_scores_gemma":[0.99376273,0.000056564557,0.0057634073,0.00003949147,0.0002072167,0.0000010869811,0.0000019453519,0.000043693308,0.00012385409],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991032,0.000023226285,0.00021822091,0.00019495701,0.00021391675,0.0002464979],"domain_scores_gemma":[0.9993943,0.00016869322,0.000059120437,0.0002221698,0.000059321585,0.00009640085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014333805,0.00018853221,0.00021411093,0.000062024184,0.00006757849,0.000051562412,0.00019134583,0.000039476632,0.00003613328],"category_scores_gemma":[0.00005601314,0.00016154387,0.000043086144,0.000272929,0.00004744262,0.00023285471,0.00023798354,0.00012713102,0.000012950894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049261616,0.000011721465,0.0012630126,0.00008397353,0.00020425346,0.000015274027,0.0023254834,0.54869354,0.44659477,0.00007370084,0.00017721787,0.0005077775],"study_design_scores_gemma":[0.0008038155,0.000035205743,0.0034209678,0.0000926078,0.00008734355,0.000013041373,0.0014326664,0.9668295,0.026102899,0.000008843931,0.0008792973,0.0002938094],"about_ca_topic_score_codex":0.00089322345,"about_ca_topic_score_gemma":0.0000074526783,"teacher_disagreement_score":0.42049187,"about_ca_system_score_codex":0.000119845354,"about_ca_system_score_gemma":0.000024477084,"threshold_uncertainty_score":0.6587568},"labels":[],"label_agreement":null},{"id":"W3024223789","doi":"10.1149/ma2020-013517mtgabs","title":"An Evaluation of Storage for Commercial Scale Demand Charge Management in British Columbia","year":2020,"lang":"en","type":"article","venue":"ECS Meeting Abstracts","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Tariff; Battery (electricity); Environmental economics; Energy storage; Peak demand; Renewable energy; Service (business); Business; Operations management; Environmental science; Electrical engineering; Economics; Engineering; Power (physics); Electricity","score_opus":0.0227899898075387,"score_gpt":0.24345288998011244,"score_spread":0.22066290017257373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024223789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97877496,0.00008855289,0.00016597306,0.00004837787,0.0003314875,0.00052418467,0.000014026152,0.00012388207,0.01992857],"genre_scores_gemma":[0.99784184,0.000016273454,0.0016981647,0.000055521064,0.00019792253,0.00009255945,0.00004107218,0.00003607772,0.000020602833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988642,0.000041715346,0.00034600636,0.00020292013,0.00032038556,0.00022478147],"domain_scores_gemma":[0.99962544,0.000031706182,0.00006443437,0.00014510383,0.000054372664,0.000078958285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010446225,0.00008478477,0.00017000563,0.000039018483,0.000045753048,0.0000865838,0.00015029544,0.000050395432,0.000042235304],"category_scores_gemma":[0.000053817916,0.00016008102,0.000036100366,0.00014079473,0.000012864162,0.00012064698,0.00002848033,0.00007869431,0.0000071203062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004156935,0.000053037656,0.004268206,0.00022082841,0.000031756255,0.000006472205,0.00024251419,0.9834072,0.0019436522,0.0000011914266,0.003744157,0.0060768533],"study_design_scores_gemma":[0.0014470532,0.000049115115,0.46717674,0.00014581707,0.00008621037,6.7696004e-7,0.0001937706,0.52361166,0.004073564,0.00004554178,0.0029336796,0.0002361843],"about_ca_topic_score_codex":0.000889523,"about_ca_topic_score_gemma":0.0072470712,"teacher_disagreement_score":0.46290854,"about_ca_system_score_codex":0.00008507672,"about_ca_system_score_gemma":0.000008235493,"threshold_uncertainty_score":0.65279144},"labels":[],"label_agreement":null},{"id":"W3024832742","doi":"10.3390/su12104053","title":"Powering the Commercial Sector in Nigeria Using Urban Swarm Solar Electrification","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Electrification; Electricity; Business; Quarter (Canadian coin); Obstacle; Constraint (computer-aided design); Rural electrification; Electricity retailing; Environmental economics; Photovoltaic system; Grid; Natural resource economics; Industrial organization; Economics; Electricity market; Engineering; Electrical engineering; Geography","score_opus":0.014460697524094075,"score_gpt":0.22399343010051406,"score_spread":0.20953273257642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024832742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97948146,0.000099738456,0.01778058,0.0013913568,0.00024374356,0.00042518607,0.0000017106065,0.00023026476,0.00034596215],"genre_scores_gemma":[0.9994559,0.000004233279,0.000101325735,0.00014467702,0.00022477072,0.000029528157,0.000005064706,0.000027075039,0.000007423129],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900264,0.000084914034,0.00023606683,0.00021292441,0.00013180288,0.00033164254],"domain_scores_gemma":[0.9994666,0.000059225153,0.000023451392,0.00031794977,0.000073565396,0.000059193168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003556925,0.00013766451,0.00014352346,0.00004737745,0.00007949489,0.00004200325,0.00022047064,0.000053279648,0.000029435338],"category_scores_gemma":[0.00034483802,0.00012793213,0.000048135964,0.00047600165,0.000037198555,0.00012022267,0.000045885445,0.00023108599,0.0000036752908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048930327,0.000044283723,0.07308265,0.00034346044,0.00003561803,0.000012756846,0.005330042,0.91383183,0.0031393752,0.0011821598,0.001055003,0.0018938686],"study_design_scores_gemma":[0.00078472187,0.000082090024,0.23865786,0.000015556501,0.000030590803,0.0000013178358,0.0030223068,0.69896805,0.014175024,0.0014988056,0.042073086,0.0006905779],"about_ca_topic_score_codex":0.00012675405,"about_ca_topic_score_gemma":0.0001036656,"teacher_disagreement_score":0.21486379,"about_ca_system_score_codex":0.0009989447,"about_ca_system_score_gemma":0.00006340598,"threshold_uncertainty_score":0.5216921},"labels":[],"label_agreement":null},{"id":"W3026677425","doi":"10.1007/s13235-020-00357-w","title":"Coupling a Power Dispatch Model with a Wardrop or Mean-Field-Game Equilibrium Model","year":2020,"lang":"en","type":"article","venue":"Dynamic Games and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Mathematical optimization; Variational inequality; Mixed complementarity problem; Nash equilibrium; Heuristics; Supply chain network; Mean field theory; Complementarity (molecular biology); Nonlinear system; Computer science; Mathematics; Supply chain","score_opus":0.009603850456420994,"score_gpt":0.21232499605389654,"score_spread":0.20272114559747556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026677425","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10478236,0.00009833278,0.8917744,0.0011612853,0.000013239665,0.00028453147,0.000023593051,0.00034371877,0.0015185273],"genre_scores_gemma":[0.9913262,0.000117181895,0.0074133356,0.00030599092,0.000029713538,0.00035825322,0.000022964674,0.000049062768,0.0003772929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992568,0.0000016927797,0.00015369442,0.00026188546,0.00011156032,0.00021435617],"domain_scores_gemma":[0.99955326,0.000020493819,0.000022772128,0.00025946065,0.000021826116,0.00012219997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000027153641,0.00016457101,0.00015365022,0.000031767788,0.00003831166,0.000045317265,0.00014996901,0.000046873323,0.000012444139],"category_scores_gemma":[0.0000029432324,0.00013546148,0.000029374209,0.0001786157,0.000025866446,0.00009039637,0.00007733209,0.00011519282,0.000008827156],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012142829,0.000012623562,0.0000255539,0.000051310817,0.000035691748,9.94396e-7,0.00032717994,0.99490434,0.0007328574,0.0027831774,0.00033168847,0.00078244734],"study_design_scores_gemma":[0.00022446738,0.000029539799,0.000038880644,0.0000132010655,0.000033744524,0.0000018765992,0.00013665459,0.9972204,0.000037372436,0.00028463124,0.0017860386,0.00019320195],"about_ca_topic_score_codex":0.0000070319934,"about_ca_topic_score_gemma":0.000027134432,"teacher_disagreement_score":0.88654387,"about_ca_system_score_codex":0.00002883185,"about_ca_system_score_gemma":0.000017171824,"threshold_uncertainty_score":0.5523959},"labels":[],"label_agreement":null},{"id":"W3027610032","doi":"10.3390/en13102577","title":"Impact of an Energy Monitoring System on the Energy Efficiency of an Automobile Factory: A Case Study","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"SCADA; Energy consumption; Modbus; Efficient energy use; Factory (object-oriented programming); Energy conservation; Energy management; Energy accounting; Ethernet; Engineering; Embedded system; Energy (signal processing); Automotive engineering; Software; Reliability engineering; Computer science; Operating system; Electrical engineering","score_opus":0.020391068840562028,"score_gpt":0.24411768990964192,"score_spread":0.2237266210690799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3027610032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978374,0.00012167705,0.0004114946,0.000004119638,0.0004035906,0.00008899018,0.000011879985,0.0004273705,0.0006934306],"genre_scores_gemma":[0.99951243,0.000009293975,0.00005311354,0.0000051808775,0.0002771422,0.000064232954,0.000004080796,0.00005981863,0.000014683692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861294,0.00014414164,0.00036317,0.00027133615,0.00033950474,0.0002689239],"domain_scores_gemma":[0.9990099,0.00009667638,0.000091640344,0.00062934955,0.00004669127,0.00012574451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014644826,0.00027392173,0.00034666155,0.00013568794,0.00007647796,0.000033828623,0.00039892746,0.00005415273,0.000016870985],"category_scores_gemma":[0.000017798686,0.0001982927,0.00012013434,0.00038630987,0.000040581654,0.00017024984,0.000092689035,0.000085315834,0.0000010794729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018291543,0.00017193494,0.0005890794,0.00004111937,0.00018617963,0.00026942661,0.0020704246,0.99025005,0.0037155275,0.0010743184,0.000055082597,0.0015585514],"study_design_scores_gemma":[0.0010462073,0.004119963,0.0069401343,0.00010873344,0.00014292757,0.00007174925,0.03751393,0.76068777,0.1881518,0.00000727724,0.0005172782,0.00069224014],"about_ca_topic_score_codex":0.003639802,"about_ca_topic_score_gemma":0.00009638622,"teacher_disagreement_score":0.22956231,"about_ca_system_score_codex":0.00012453202,"about_ca_system_score_gemma":0.00002474028,"threshold_uncertainty_score":0.80861413},"labels":[],"label_agreement":null},{"id":"W3029705877","doi":"10.1109/access.2020.2997942","title":"Residential Power Forecasting Based on Affinity Aggregation Spectral Clustering","year":2020,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Cluster analysis; Spectral clustering; Schedule; Autoregressive model; Data mining; Artificial intelligence; Econometrics; Mathematics","score_opus":0.044865113200780314,"score_gpt":0.24619589796644403,"score_spread":0.2013307847656637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3029705877","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.788809,0.000015063137,0.18292515,0.0005217486,0.0025011415,0.0002106853,0.0000047117296,0.0008243298,0.02418819],"genre_scores_gemma":[0.9982627,0.0000024210742,0.00055506604,0.00046645373,0.00063452654,0.000015023758,0.000006343083,0.00004321001,0.000014234814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912,0.000019498739,0.00018590334,0.00020667164,0.00022411968,0.00024381712],"domain_scores_gemma":[0.9996354,0.000043761807,0.000034351335,0.00018296947,0.000017250863,0.00008629714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000843532,0.00014922547,0.00012094011,0.00008354559,0.000060530332,0.00016542013,0.00029694632,0.00004522587,0.00015160297],"category_scores_gemma":[0.000046846857,0.0001663263,0.00005281517,0.00024531077,0.000010696312,0.0003255142,0.00005426383,0.00014660413,0.000050146493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026266018,0.0000071816025,0.0006275445,0.00004966412,0.000015831387,0.000031223663,0.00007044949,0.9938367,0.00048129595,0.000020009149,0.003986484,0.0008473457],"study_design_scores_gemma":[0.00036407207,0.000040482522,0.0043352954,0.00004390907,0.000011807466,7.60993e-7,0.000008627244,0.970299,0.02376416,0.00002741565,0.00091018865,0.0001942467],"about_ca_topic_score_codex":0.00002480842,"about_ca_topic_score_gemma":0.000055264547,"teacher_disagreement_score":0.20945373,"about_ca_system_score_codex":0.00007519061,"about_ca_system_score_gemma":0.000008236266,"threshold_uncertainty_score":0.67825896},"labels":[],"label_agreement":null},{"id":"W3031846969","doi":"","title":"Improving electrical power systems reliability through locally controlled distributed curtailable load","year":2000,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Power (physics); Electric power system; Electrical engineering; Engineering","score_opus":0.001532398864862915,"score_gpt":0.1207044735223943,"score_spread":0.11917207465753138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031846969","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21172503,0.0021528585,0.007959746,0.0013617575,0.00096983346,0.0009208335,0.00032196761,0.0002116268,0.77437633],"genre_scores_gemma":[0.99422824,0.00016137374,0.00035067907,0.0002533331,0.0000423055,0.000030812123,0.000010319271,0.000030650397,0.004892275],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975023,0.00005232577,0.00041838427,0.00026225008,0.0013262758,0.0004384476],"domain_scores_gemma":[0.9992575,0.00019059496,0.000062419385,0.00029681475,0.0000010495763,0.00019161096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000021689022,0.00023745952,0.00039893467,0.000011259027,0.000105666484,0.000039842944,0.00021850612,0.000035686626,0.00013362302],"category_scores_gemma":[0.000006776777,0.00022411555,0.000040278577,0.00012294092,0.00004499586,0.0003507929,0.000055480545,0.00015825953,1.8848176e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030641402,0.0001454055,0.008974491,0.00071765465,0.0007517803,0.00040462753,0.00011240823,0.8507439,0.011223581,0.09098221,0.02681545,0.006064357],"study_design_scores_gemma":[0.0037516458,0.00016483794,0.008079773,0.00012896436,0.00008584616,0.000013983908,0.00047306225,0.65506846,0.014597974,0.00039783845,0.31640276,0.0008348665],"about_ca_topic_score_codex":0.0053924383,"about_ca_topic_score_gemma":0.0033692506,"teacher_disagreement_score":0.78250325,"about_ca_system_score_codex":0.00005004921,"about_ca_system_score_gemma":0.00059851265,"threshold_uncertainty_score":0.9139167},"labels":[],"label_agreement":null},{"id":"W3032194596","doi":"","title":"A framework for peak shaving through the coordination of smart homes","year":2019,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Bilevel optimization; Heuristic; Work (physics); Computer science; Consumption (sociology); Phase (matter); Operations research; Mathematical optimization; Integer (computer science); Integer programming; Optimization problem; Engineering; Artificial intelligence; Mathematics; Algorithm","score_opus":0.00970233543388319,"score_gpt":0.22375070195863458,"score_spread":0.2140483665247514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3032194596","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11433042,0.00092255557,0.8788081,0.0018749189,0.0005499503,0.0011082067,0.000021903585,0.0007140589,0.0016699189],"genre_scores_gemma":[0.925021,0.00010298751,0.07293578,0.000454673,0.00014431095,0.00067085173,0.000016759219,0.000090599904,0.0005630214],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861676,0.000037139875,0.00037628994,0.00024546572,0.00025770205,0.00046662134],"domain_scores_gemma":[0.99866486,0.0002980455,0.000113715134,0.00078835996,0.00007731058,0.00005774159],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039341714,0.00024865096,0.00029827567,0.00016549912,0.000096777105,0.00007271447,0.00048758328,0.00018727935,0.000047248668],"category_scores_gemma":[0.00013541161,0.00021617352,0.00017116182,0.0004193395,0.000043411233,0.00026888738,0.00012529176,0.00025037501,0.000014672553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066609726,0.00009983407,0.017468216,0.00038772583,0.00025026713,0.000003299021,0.00087169243,0.427901,0.0064427396,0.5247351,0.013383223,0.008390269],"study_design_scores_gemma":[0.0008482862,0.00025967916,0.046137363,0.0002823895,0.00011755084,0.0000151349195,0.0007210128,0.8362695,0.027976131,0.03562059,0.05098806,0.00076430815],"about_ca_topic_score_codex":0.00084869564,"about_ca_topic_score_gemma":0.000352868,"teacher_disagreement_score":0.8106906,"about_ca_system_score_codex":0.00024661326,"about_ca_system_score_gemma":0.00002879881,"threshold_uncertainty_score":0.88153005},"labels":[],"label_agreement":null},{"id":"W3033176342","doi":"10.1109/eeeic/icpseurope49358.2020.9160629","title":"Optimal Operation of Home Energy Management Systems in the Presence of the Inverter-based Heating, Ventilation and Air Conditioning System","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"HVAC; Air conditioning; Energy management system; Computer science; Electricity; Scheduling (production processes); Energy management; Automotive engineering; Ventilation (architecture); Inverter; Linear programming; Mathematical optimization; Simulation; Energy (signal processing); Engineering; Electrical engineering; Voltage; Mathematics","score_opus":0.008651215297382862,"score_gpt":0.1779578516203559,"score_spread":0.16930663632297305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033176342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79543966,0.00020992356,0.19854999,0.00024238936,0.0003716784,0.0005245005,0.0000055291825,0.00010690949,0.004549452],"genre_scores_gemma":[0.9995456,0.000004847241,0.0002880784,0.000054678283,0.000024216488,0.000052597887,0.0000071858058,0.000007912448,0.000014934154],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993458,0.00006283463,0.00023891749,0.00009288414,0.00018620155,0.00007338588],"domain_scores_gemma":[0.9997512,0.000030655126,0.000045071673,0.00014505612,0.00001476737,0.000013260332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014934634,0.00007031523,0.00010124583,0.000043541568,0.000029179255,0.000019053388,0.00013159972,0.000020075327,0.0000040218642],"category_scores_gemma":[0.0000038230805,0.00004829359,0.00002055966,0.0001725461,0.00001921259,0.00007857486,0.000038611684,0.000033553304,4.0505415e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037959394,0.000005800574,0.001153047,0.00050205673,0.000019804977,9.351839e-7,0.00023969467,0.9825295,0.0005501612,0.014697962,0.00022200886,0.00007518317],"study_design_scores_gemma":[0.00022518476,0.00002130874,0.011571699,0.00015325064,0.000014912521,5.7767835e-7,0.0010761212,0.983363,0.0033751084,0.0000018109915,0.00014783321,0.000049226404],"about_ca_topic_score_codex":0.00015833287,"about_ca_topic_score_gemma":0.000017296961,"teacher_disagreement_score":0.20410591,"about_ca_system_score_codex":0.00003047304,"about_ca_system_score_gemma":0.000003475224,"threshold_uncertainty_score":0.19693553},"labels":[],"label_agreement":null},{"id":"W3033321370","doi":"10.1109/eeeic/icpseurope49358.2020.9160522","title":"Internet of Things for Power and Energy Systems Applications in Buildings: An Overview","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Computer science; Efficient energy use; Internet of Things; Control (management); Building automation; Software; Systems engineering; Computer security; Engineering; Electrical engineering","score_opus":0.023057935500934747,"score_gpt":0.22738165140140645,"score_spread":0.20432371590047171,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033321370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039175387,0.004027145,0.9411414,0.00024384457,0.00020599004,0.0003680072,0.0000057865545,0.00037555958,0.0144568775],"genre_scores_gemma":[0.9972419,0.00012964568,0.0021337725,0.00021060165,0.000026093874,0.00012353227,0.000008015722,0.000018036444,0.00010836807],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996207,0.000004565191,0.00014668731,0.000106714026,0.000043808057,0.000077539975],"domain_scores_gemma":[0.99982375,0.00001967487,0.000014766353,0.00009064483,0.000010716214,0.00004046441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000047323818,0.00006525022,0.000112739974,0.000039461414,0.0000046843284,0.000014793584,0.00008879931,0.000023999237,0.000009581475],"category_scores_gemma":[0.000003955443,0.00006229202,0.0000154504,0.000094749055,0.000006720263,0.00010366681,0.000033519,0.00002092854,5.789647e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008825702,0.000045144785,0.0013497635,0.0011379387,0.0001024199,7.817977e-7,0.0016807726,0.1244013,0.0022297802,0.85734767,0.008494491,0.0032011226],"study_design_scores_gemma":[0.00025013494,0.000057974834,0.00051636144,0.000041126594,0.000011282764,4.4859374e-7,0.00036231912,0.69930357,0.0011065969,0.00015238866,0.2980528,0.00014502127],"about_ca_topic_score_codex":0.00021971253,"about_ca_topic_score_gemma":0.0000131662255,"teacher_disagreement_score":0.9580665,"about_ca_system_score_codex":0.000014458295,"about_ca_system_score_gemma":0.0000015048655,"threshold_uncertainty_score":0.2540195},"labels":[],"label_agreement":null},{"id":"W3033651303","doi":"10.1049/iet-gtd.2019.1285","title":"Forecasting and optimisation for microgrid in home energy management systems","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Microgrid; Energy management; Energy management system; Computer science; Reliability engineering; Energy (signal processing); Engineering; Control (management); Artificial intelligence; Mathematics; Statistics","score_opus":0.0258862522338477,"score_gpt":0.19923359849913794,"score_spread":0.17334734626529025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033651303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04491177,0.00095607055,0.9525232,0.00051159644,0.00036284633,0.0003909751,0.00005878144,0.00017911285,0.0001056896],"genre_scores_gemma":[0.9937976,0.0006865813,0.0029476807,0.00006741235,0.00029414665,0.00023869889,0.0019125337,0.00002783484,0.000027495176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990101,0.00002897598,0.0003395638,0.00026688408,0.00014425904,0.0002102316],"domain_scores_gemma":[0.9997244,0.000015545093,0.00003537851,0.0000868256,0.000033563058,0.00010428741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014127344,0.00016548383,0.00014997115,0.000060049246,0.00008653453,0.00008584367,0.00006355386,0.00007827611,0.00000826879],"category_scores_gemma":[0.0000049601567,0.00017919311,0.000040284172,0.00020454208,0.000010720846,0.0001696861,0.000011858778,0.00005230105,0.0000012247372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002928645,0.000018246672,0.000057998437,0.00030469405,0.000031116764,0.000003691782,0.000120670156,0.9203055,0.012472031,0.0029143353,0.0074723945,0.056270037],"study_design_scores_gemma":[0.0007526646,0.000039790615,0.00023201211,0.00003949452,0.00002476269,0.0000018175227,0.000049303475,0.9028898,0.008614471,0.000030802323,0.08714249,0.0001826079],"about_ca_topic_score_codex":0.000010302458,"about_ca_topic_score_gemma":0.0000040109885,"teacher_disagreement_score":0.9495755,"about_ca_system_score_codex":0.000115107054,"about_ca_system_score_gemma":0.000005537349,"threshold_uncertainty_score":0.73072827},"labels":[],"label_agreement":null},{"id":"W3034416419","doi":"10.1016/j.enbuild.2020.110222","title":"Disaggregation of commercial building end-uses with automation system data","year":2020,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Carleton University","funders":"National Research Council Canada; Natural Resources Canada; Delta","keywords":"Chiller; Electricity; Automation; Electric power distribution; Engineering; Computer science; Automotive engineering; Reliability engineering; Mechanical engineering; Electrical engineering","score_opus":0.015828506094434824,"score_gpt":0.19618470048688139,"score_spread":0.18035619439244657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034416419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7099226,0.00034169137,0.28679052,0.0003543987,0.00023353861,0.00006583167,0.000019067602,0.0005726811,0.0016996801],"genre_scores_gemma":[0.99449795,0.000044625132,0.005118184,0.00006280247,0.00018956151,0.000006193495,0.000051728864,0.00002245163,0.0000064795663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993714,0.000014603059,0.0001691807,0.0001816511,0.00014556872,0.00011757752],"domain_scores_gemma":[0.9996423,0.000031336007,0.000051785904,0.00020319546,0.000016580248,0.000054800093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008041669,0.000115206894,0.00015010848,0.000050574483,0.00004888167,0.000034255274,0.00018730965,0.000038421847,0.000007941918],"category_scores_gemma":[0.000012342696,0.00010444588,0.00001235879,0.00018035782,0.000030855866,0.00029498807,0.00011270583,0.000040465722,6.2025964e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008348493,0.000029776342,0.0043334574,0.0009447497,0.0003541097,0.000017726272,0.00082021026,0.54028857,0.018633593,0.36686906,0.00794754,0.05967772],"study_design_scores_gemma":[0.000810229,0.00011870867,0.0042549246,0.00036691016,0.00012663871,0.000012632868,0.00029099156,0.8362255,0.04817042,0.00004741751,0.109136954,0.0004386654],"about_ca_topic_score_codex":0.00009335256,"about_ca_topic_score_gemma":0.000023033313,"teacher_disagreement_score":0.36682165,"about_ca_system_score_codex":0.000023555804,"about_ca_system_score_gemma":0.000005413377,"threshold_uncertainty_score":0.42591792},"labels":[],"label_agreement":null},{"id":"W3035406851","doi":"10.5445/ir/1000120042","title":"Global application, performance and risk analysis of Aquifer Thermal Energy Storage (ATES)","year":2020,"lang":"de","type":"article","venue":"Repository KITopen (Karlsruhe Institute of Technology)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Shandong Jianzhu University; Simon Fraser University","keywords":"Gynecology; Political science; Forestry; Environmental science; Medicine; Geography","score_opus":0.0047492683918198796,"score_gpt":0.1885762260214388,"score_spread":0.18382695762961893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035406851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9720275,0.0057313517,0.016056696,0.00033380845,0.0012182648,0.00031074678,0.00006523284,0.00037031408,0.0038860887],"genre_scores_gemma":[0.9946329,0.002637643,0.0021731022,0.00003892844,0.00029664254,0.00006545312,0.000035955458,0.000041552783,0.00007782573],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973444,0.000045201803,0.0010529883,0.0007300914,0.000409646,0.00041768508],"domain_scores_gemma":[0.9978901,0.000020258929,0.0006060945,0.0011392639,0.00017828845,0.00016598996],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018859343,0.00047447078,0.001044133,0.0005967752,0.00017829333,0.000042419135,0.001007209,0.00050467707,0.000014970829],"category_scores_gemma":[0.000054510892,0.00051012204,0.00023629157,0.0033569697,0.0005940616,0.0003849597,0.0006763147,0.00031205596,0.000011992692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007574338,0.0001055996,0.1939738,0.00034745544,0.0075106374,0.000040743686,0.000114332855,0.768608,0.006708482,0.004910599,0.00066539465,0.01693924],"study_design_scores_gemma":[0.0011546063,0.00038515413,0.15028049,0.00017383764,0.010285251,0.000012008474,0.00013102767,0.6007302,0.044950396,0.00004022031,0.19081822,0.0010386283],"about_ca_topic_score_codex":0.0007165718,"about_ca_topic_score_gemma":0.00006191758,"teacher_disagreement_score":0.19015282,"about_ca_system_score_codex":0.00019724108,"about_ca_system_score_gemma":0.00008354494,"threshold_uncertainty_score":0.99973506},"labels":[],"label_agreement":null},{"id":"W3035722626","doi":"10.1109/mce.2020.3002483","title":"Home Automation System Coordinator Replacement With One-Touch Network Recommissioning","year":2020,"lang":"en","type":"article","venue":"IEEE Consumer Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Science Foundation Ireland","keywords":"Home automation; Computer science; Architecture; Rendering (computer graphics); Automation; Network architecture; Networking hardware; Telecommunications; Computer network; Computer security; Engineering","score_opus":0.010381713950190859,"score_gpt":0.19096635582642585,"score_spread":0.180584641876235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035722626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45326316,0.015415573,0.4535264,0.004369477,0.0049725757,0.0030489578,0.000025823623,0.01366867,0.05170936],"genre_scores_gemma":[0.9953117,0.00023975971,0.0032002772,0.00020149928,0.0003777168,0.00012356116,0.000041303676,0.00012954646,0.00037463038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980752,0.000056433524,0.000415335,0.00039993032,0.00034176875,0.0007113599],"domain_scores_gemma":[0.99913037,0.000052235016,0.00009830619,0.00042349254,0.000075817385,0.00021980898],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020588019,0.00032886348,0.00037405398,0.00007710776,0.00012671013,0.000083927574,0.00025072246,0.00008912648,0.000086914195],"category_scores_gemma":[0.0000122128595,0.00032956025,0.000055159708,0.00058001134,0.00002467306,0.00015785056,0.000047444846,0.00034696874,0.000318322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002067224,0.000038066915,0.0016403729,0.0006529585,0.00076958654,0.000036145724,0.000118725475,0.8770309,0.0030163045,0.0037018834,0.10784199,0.0049463073],"study_design_scores_gemma":[0.0017749252,0.00041200928,0.00081881735,0.00030076597,0.0002197769,0.000024293317,0.000032727938,0.68648994,0.0033575953,0.000036596124,0.30575585,0.0007767225],"about_ca_topic_score_codex":0.0000032977423,"about_ca_topic_score_gemma":0.000020136162,"teacher_disagreement_score":0.5420486,"about_ca_system_score_codex":0.00050459034,"about_ca_system_score_gemma":0.00006656889,"threshold_uncertainty_score":0.99991566},"labels":[],"label_agreement":null},{"id":"W3035840468","doi":"10.34890/833","title":"Transactive Demand Response—Hydro Ottawa Experience","year":2019,"lang":"en","type":"article","venue":"CIRED","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transactive memory; Business; Environmental science; Environmental planning; Computer science; Knowledge management","score_opus":0.005317119503052802,"score_gpt":0.18889264952779775,"score_spread":0.18357553002474494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035840468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9642582,0.000101492544,0.013073606,0.000051595154,0.00078709406,0.00013129278,0.00000164199,0.00030910104,0.021285953],"genre_scores_gemma":[0.99825245,0.0000073823926,0.00020363464,0.000051520874,0.000039639977,0.00003598069,0.0000016516614,0.000026558653,0.0013811989],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993877,0.000026190528,0.000112974376,0.00015629824,0.00011960452,0.00019723592],"domain_scores_gemma":[0.99960244,0.000048920807,0.0000102084,0.00028019334,0.000009404146,0.000048839254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010452302,0.00010463151,0.00011038205,0.00006013689,0.000023041513,0.000017225415,0.00014208733,0.000041469753,0.00032037674],"category_scores_gemma":[0.000010287562,0.00011242514,0.00003721911,0.00012911098,0.000018896426,0.000117889154,0.000011061972,0.00005902139,0.0003559772],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018993668,0.00003540565,0.0025989173,0.00007432321,0.00013944245,0.00003841232,0.0065236166,0.8359756,0.14584015,0.0005035016,0.004878186,0.0032024935],"study_design_scores_gemma":[0.0023198423,0.00016476915,0.13933222,0.000077504905,0.000039784307,0.000011961255,0.0012841534,0.3261258,0.22508697,0.00017910426,0.30426213,0.0011157603],"about_ca_topic_score_codex":0.0000055010737,"about_ca_topic_score_gemma":0.0000035737444,"teacher_disagreement_score":0.5098498,"about_ca_system_score_codex":0.00006416323,"about_ca_system_score_gemma":0.000004700395,"threshold_uncertainty_score":0.45845643},"labels":[],"label_agreement":null},{"id":"W3036826955","doi":"10.18280/ijsdp.150417","title":"Method for Forecasting Electric Consumption for Household Users in the Conditions of the Republic of Tajikistan","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Consumption (sociology); The Republic; Agricultural economics; Environmental economics; Electric vehicle; Business; Environmental science; Natural resource economics; Economics; Sociology; Social science","score_opus":0.050023480333521254,"score_gpt":0.2738389624149991,"score_spread":0.22381548208147786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036826955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87040555,0.0001764205,0.12838624,0.00050189224,0.00016313011,0.00023416983,0.000006951342,0.000006512823,0.000119118755],"genre_scores_gemma":[0.9874274,0.00000956393,0.012334087,0.00009620186,0.00007879773,0.000019205123,0.0000072580906,0.000008215957,0.000019258045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926865,0.00001933167,0.00036923497,0.00005092643,0.00017863367,0.00011322884],"domain_scores_gemma":[0.99921393,0.0003131381,0.0001948497,0.000030545605,0.00022950524,0.00001804809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006338334,0.00006177448,0.00011140725,0.00017866709,0.000044625474,0.00002766872,0.00020961076,0.000021809607,0.0000015811656],"category_scores_gemma":[0.00020720094,0.000044842844,0.0000431822,0.00015124907,0.000010703365,0.00012945263,0.000024798159,0.000079039666,1.3558819e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030984334,0.000046248973,0.030493839,0.00082604965,0.00069113466,0.00006955474,0.01895203,0.9135922,0.0016304728,0.02137966,0.007672497,0.0043364707],"study_design_scores_gemma":[0.008088581,0.00043695074,0.22831921,0.0012256599,0.00027211508,0.0001791445,0.08489153,0.4714168,0.045533728,0.0053624604,0.15353405,0.00073977036],"about_ca_topic_score_codex":0.000003169513,"about_ca_topic_score_gemma":0.0000012887064,"teacher_disagreement_score":0.44217542,"about_ca_system_score_codex":0.00007644439,"about_ca_system_score_gemma":0.00005650922,"threshold_uncertainty_score":0.1828638},"labels":[],"label_agreement":null},{"id":"W3036863675","doi":"10.1109/giots49054.2020.9119669","title":"Survey of Internet of Things (IoT) Infrastructures for Building Energy Systems","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Internet of Things; Computer science; Efficient energy use; Building automation; Control (management); Data science; Software; Data collection; Systems engineering; Computer security; Architectural engineering; Risk analysis (engineering); Engineering; Artificial intelligence","score_opus":0.016012163817451977,"score_gpt":0.20441901384207037,"score_spread":0.18840685002461838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036863675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09046985,0.0002924583,0.9047049,0.000019967169,0.00066319644,0.000110041634,0.000014665473,0.00017890542,0.0035459665],"genre_scores_gemma":[0.99598527,0.000007797175,0.0037753908,0.000055961675,0.000053620464,0.000010318171,0.000013436827,0.00002566616,0.00007255277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936223,0.00001699955,0.00028954746,0.000105975756,0.00010711038,0.00011814423],"domain_scores_gemma":[0.9996458,0.00009299794,0.00004976554,0.00011786978,0.00005267729,0.000040880524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012621532,0.00010011894,0.0002224175,0.000055891156,0.0000052282476,0.0000106797615,0.00018847786,0.00004093329,0.000028124467],"category_scores_gemma":[0.000064369,0.00009246354,0.00004058338,0.00013423964,0.000013633809,0.00005035571,0.00006358883,0.000032293457,4.3079893e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016722643,0.00000405676,0.0024114372,0.00063453283,0.00018605066,4.0866686e-7,0.00025611816,0.95140827,0.0056618787,0.016067239,0.022417728,0.000935568],"study_design_scores_gemma":[0.00021543035,0.00005055342,0.00564395,0.000034749417,0.000011460861,2.6430882e-7,0.00003859873,0.9469637,0.042218536,0.000044863416,0.0046645533,0.00011330885],"about_ca_topic_score_codex":0.0023224694,"about_ca_topic_score_gemma":0.000041325166,"teacher_disagreement_score":0.90551543,"about_ca_system_score_codex":0.000018278002,"about_ca_system_score_gemma":0.0000048281104,"threshold_uncertainty_score":0.37705538},"labels":[],"label_agreement":null},{"id":"W3041031172","doi":"","title":"Distributed energy resources in practice: A case study analysis and \\nvalidation of LBNL's customer adoption model","year":2003,"lang":"en","type":"report","venue":"eScholarship (California Digital Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mantra Energy Alternatives (Canada)","funders":"","keywords":"Schedule; Computer science; Electricity; Resource (disambiguation); Work (physics); Operations research; Scale (ratio); Sample (material); Industrial engineering; Engineering; Geography","score_opus":0.0171044030990094,"score_gpt":0.23830403004852932,"score_spread":0.22119962694951992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041031172","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90033156,0.0014946723,0.01233315,0.000047082365,0.00031560706,0.0008492501,0.006300787,0.00070468226,0.07762322],"genre_scores_gemma":[0.99429035,0.00055223895,0.0005773698,0.000024353954,0.00008353159,0.00010430643,0.003610351,0.0001615789,0.00059593224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966659,0.00018486871,0.0011476206,0.0006537414,0.0009367774,0.00041110368],"domain_scores_gemma":[0.9984188,0.00017211358,0.00039745806,0.00067348324,0.00013930297,0.00019883974],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00059977634,0.0005811907,0.00086123944,0.0014962176,0.00006006156,0.0006899395,0.00025049775,0.00037522375,0.000045653742],"category_scores_gemma":[0.0003591397,0.00061119604,0.0002254056,0.0022660205,0.000053765543,0.0028357399,0.00022895618,0.0005666075,0.000016504553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001296409,0.0011929646,0.21387543,0.00065985636,0.0048310715,0.003449087,0.00019060599,0.76419663,0.000010646798,0.00018625591,0.005706096,0.0055717155],"study_design_scores_gemma":[0.0032057054,0.00036680396,0.0136396345,0.00056692597,0.009010981,0.00081610424,0.0030495808,0.20440969,0.00040802849,0.00044335783,0.7599607,0.0041224626],"about_ca_topic_score_codex":0.00021079012,"about_ca_topic_score_gemma":0.00011156153,"teacher_disagreement_score":0.75425464,"about_ca_system_score_codex":0.0002594531,"about_ca_system_score_gemma":0.00012803094,"threshold_uncertainty_score":0.99963397},"labels":[],"label_agreement":null},{"id":"W3042184416","doi":"10.1109/tsg.2020.3007984","title":"A Data-Driven Approach for Generating Synthetic Load Patterns and Usage Habits","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University; Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Leverage (statistics); Smart grid; Machine learning; Smart meter; Artificial intelligence; Grid; Context (archaeology); Generative grammar; Big data; Kernel (algebra); Data modeling; Data science; Distributed computing; Data mining; Engineering; Software engineering","score_opus":0.04003366927041682,"score_gpt":0.22829341603793427,"score_spread":0.18825974676751744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042184416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036242403,0.000044611552,0.960805,0.00022172941,0.0009113363,0.00038724844,0.0005686371,0.00040616165,0.00041288353],"genre_scores_gemma":[0.9805263,0.0000806745,0.018137781,0.000339833,0.00047550796,0.00022617837,0.0000662603,0.00008179652,0.00006565551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987794,0.000026830203,0.00024428728,0.00045951764,0.00020081684,0.00028911367],"domain_scores_gemma":[0.99926996,0.00006938995,0.000023989349,0.00046186137,0.000024095789,0.00015071599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012160362,0.00023247066,0.00022072234,0.00006512208,0.00015003422,0.0000711072,0.00026972627,0.000066390676,0.000032501863],"category_scores_gemma":[0.0000066222265,0.0002450592,0.000063311585,0.00013871881,0.000026452502,0.00020519707,0.000006727326,0.00018623374,0.000018344406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014870601,0.00003587785,0.00004435552,0.00020810055,0.00011429074,0.000003371355,0.00020077857,0.99015015,0.0013740547,0.0000073314295,0.0025024328,0.005344354],"study_design_scores_gemma":[0.00046965154,0.00007037539,0.00010812779,0.000022280745,0.00009717967,0.0000056379645,0.000052091647,0.98276126,0.0036453009,0.0000011332284,0.012496706,0.00027023448],"about_ca_topic_score_codex":0.0000235499,"about_ca_topic_score_gemma":0.00007464803,"teacher_disagreement_score":0.9442839,"about_ca_system_score_codex":0.00006011196,"about_ca_system_score_gemma":0.0000142269055,"threshold_uncertainty_score":0.9993225},"labels":[],"label_agreement":null},{"id":"W3042601164","doi":"10.1109/tsg.2020.3009989","title":"Robust Hierarchical Control Mechanism for Aggregated Thermostatically Controlled Loads","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Control theory (sociology); Tracking error; Computer science; Demand response; Virtual power plant; Electricity; Control (management); Mathematical optimization; Control engineering; Engineering; Distributed generation; Mathematics; Renewable energy","score_opus":0.021814080744134077,"score_gpt":0.20391072231427287,"score_spread":0.1820966415701388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042601164","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047800974,0.00002359365,0.98604524,0.0031957526,0.0024251102,0.0012536051,0.00017026614,0.0009988253,0.0011074923],"genre_scores_gemma":[0.9918502,0.000048917318,0.0037912028,0.002703335,0.00043558792,0.0008541196,0.000016143798,0.00012375516,0.00017671389],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824613,0.00006896414,0.00049186155,0.00038553856,0.00030899016,0.0004985271],"domain_scores_gemma":[0.9988885,0.00036861532,0.000043352673,0.0002990107,0.000095252224,0.00030530195],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015941476,0.00036207566,0.0005589214,0.00012683228,0.00016245479,0.00006602807,0.0002527298,0.00014216728,0.0002480193],"category_scores_gemma":[0.000026804782,0.00034147923,0.00033101416,0.00026130822,0.000052370448,0.0001138859,0.000001346423,0.00036428255,0.00015377259],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011412188,0.00010885906,0.0000012749813,0.00006806192,0.000687354,0.000016931344,0.00013125596,0.98357254,0.006174861,0.0021636174,0.0034726623,0.0024613438],"study_design_scores_gemma":[0.0124228215,0.00043359297,0.000016394206,0.000027951599,0.00028304636,0.0000042152687,0.00003380359,0.96457183,0.016429221,0.00031038077,0.005029091,0.00043767356],"about_ca_topic_score_codex":0.000007930381,"about_ca_topic_score_gemma":0.000020123933,"teacher_disagreement_score":0.98707014,"about_ca_system_score_codex":0.00008533197,"about_ca_system_score_gemma":0.00002840603,"threshold_uncertainty_score":0.99990374},"labels":[],"label_agreement":null},{"id":"W3043751588","doi":"10.2316/j.2020.203-0192","title":"WIND/FUEL CELL HYBRID SYSTEM BASED ON ANFIS-HLMS CONTROL ALGORITHM FOR VSC","year":2020,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fuel cells; Computer science; Control (management); Algorithm; Automotive engineering; Environmental science; Control theory (sociology); Engineering; Artificial intelligence; Chemical engineering","score_opus":0.005220378398874406,"score_gpt":0.18227371951123575,"score_spread":0.17705334111236135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043751588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003358396,0.0014322717,0.9729752,0.0005860539,0.0109118745,0.00011091509,0.000105299354,0.00012090272,0.010399076],"genre_scores_gemma":[0.9973382,0.00003655534,0.00047646783,0.00045094942,0.0015275186,0.000011157024,0.000010368865,0.000040443774,0.00010834146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986505,0.000036511912,0.0005155723,0.00014437543,0.00047781272,0.00017520937],"domain_scores_gemma":[0.99922705,0.00010267439,0.0001700743,0.00009354463,0.00023368055,0.00017299969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021030701,0.00018516205,0.00030226054,0.00017661652,0.00002597527,0.000118183656,0.00030128253,0.00004750304,0.000010669675],"category_scores_gemma":[0.000014263009,0.00016417388,0.00014660982,0.000052081716,0.0000146217,0.0001295704,0.000017335002,0.00010109769,0.0000046673617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009489787,0.000033111668,0.00006907581,0.00013893037,0.00037812046,0.00016401891,0.00009014238,0.9857367,0.00024011049,0.000848611,0.010718394,0.0014878729],"study_design_scores_gemma":[0.0020512592,0.0002202892,0.000058146165,0.0001388663,0.000035100737,0.000062804094,0.00015141789,0.84785056,0.00040120937,0.000005106965,0.14887327,0.00015198567],"about_ca_topic_score_codex":0.000021637157,"about_ca_topic_score_gemma":5.670607e-7,"teacher_disagreement_score":0.9939798,"about_ca_system_score_codex":0.00014104991,"about_ca_system_score_gemma":0.000021839676,"threshold_uncertainty_score":0.66948164},"labels":[],"label_agreement":null},{"id":"W3043776848","doi":"10.11575/prism/28483","title":"Towards Net-Zero Energy Supermarket: An Investigation of Passive and Active Design Strategies","year":2017,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Strong","keywords":"Zero (linguistics); Zero-energy building; Energy (signal processing); Net (polyhedron); Computer science; Environmental science; Mathematics; Statistics","score_opus":0.011107303098926522,"score_gpt":0.19051018634906067,"score_spread":0.17940288325013415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043776848","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6681376,0.0004006947,0.27969325,0.000031423726,0.0006051916,0.0003001633,0.000004709048,0.00015785435,0.050669115],"genre_scores_gemma":[0.9756966,0.0018989476,0.017637655,0.000008458486,0.000040828094,0.000003914039,0.00094897,0.00007817398,0.0036864427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920976,0.00006491691,0.00013095229,0.00022794375,0.00021620227,0.00015020979],"domain_scores_gemma":[0.9992918,0.000030998155,0.00018669435,0.00030402344,0.000093556446,0.0000929335],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007740542,0.00021935452,0.000337708,0.0002481061,0.00010539741,0.00002461486,0.00031082207,0.0002536452,0.000045032],"category_scores_gemma":[0.000008427834,0.00029250706,0.0000629365,0.000063629115,0.000120027886,0.00061525847,0.00003677684,0.00014077674,7.666377e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007282464,0.000079659105,0.00024227155,0.001885126,0.0017121279,0.00011837911,0.02362408,0.006311096,0.01856102,0.015582104,0.005909116,0.9252468],"study_design_scores_gemma":[0.0025756855,0.0007103355,0.43528968,0.0010010938,0.0014320799,0.000004819263,0.009813507,0.44897556,0.07286435,0.01755439,0.007500971,0.0022775251],"about_ca_topic_score_codex":0.002250042,"about_ca_topic_score_gemma":0.00027838958,"teacher_disagreement_score":0.9229692,"about_ca_system_score_codex":0.000067368586,"about_ca_system_score_gemma":0.00011134307,"threshold_uncertainty_score":0.99995273},"labels":[],"label_agreement":null},{"id":"W3044455029","doi":"10.48550/arxiv.2007.13645","title":"PowerGAN: Synthesizing Appliance Power Signatures Using Generative Adversarial Networks","year":2020,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Adversarial system; Generative grammar; Computer science; Power (physics); Generative adversarial network; Artificial intelligence; Deep learning; Physics","score_opus":0.05014251085474193,"score_gpt":0.16588247383502588,"score_spread":0.11573996298028395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044455029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.076189816,0.00051600067,0.91046983,0.000040288833,0.004119423,0.0004524458,0.000026722219,0.0009321507,0.007253347],"genre_scores_gemma":[0.9968885,0.00023210158,0.0016116698,0.00012642503,0.0008109264,0.0000020300404,0.000034718712,0.00012314571,0.0001704525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99803394,0.000086326756,0.00025515462,0.0009801168,0.00011414942,0.00053033663],"domain_scores_gemma":[0.99880767,0.00007833056,0.00013411698,0.00070670317,0.00006583073,0.00020733371],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000114996474,0.00059833174,0.00052089104,0.000189578,0.0001445688,0.00009461932,0.0007865933,0.00050888595,0.00013449456],"category_scores_gemma":[0.000023514678,0.0007747544,0.00025977122,0.00048805145,0.00008708145,0.0001900048,0.0009611468,0.0010507473,0.000045289686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004306548,0.000016187532,0.00010104142,0.000072500916,0.0004616018,0.00039906622,0.00010921764,0.9882331,0.00041598766,0.008400139,0.0017095049,0.000038592734],"study_design_scores_gemma":[0.00032626995,0.000016733684,0.00011413876,0.00012452914,0.00020814392,0.0000011570562,0.000120731725,0.99451435,0.0004891049,0.0010227509,0.002282794,0.00077932194],"about_ca_topic_score_codex":0.00005153693,"about_ca_topic_score_gemma":0.000019973222,"teacher_disagreement_score":0.9206987,"about_ca_system_score_codex":0.0005622795,"about_ca_system_score_gemma":0.000056913133,"threshold_uncertainty_score":0.99947035},"labels":[],"label_agreement":null},{"id":"W3046697705","doi":"10.1109/isie45063.2020.9152474","title":"Peak-to-Average Ratio Analysis of A Load Aggregator for Incentive-based Demand Response","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydrogenics (Canada); Université du Québec à Trois-Rivières","funders":"","keywords":"News aggregator; Demand response; Smart grid; Load management; Flexibility (engineering); Computer science; Incentive; Grid; Peak demand; Load shifting; Function (biology); Energy market; Operations research; Electricity; Engineering; Microeconomics; Economics","score_opus":0.01355217865614859,"score_gpt":0.21911541573445734,"score_spread":0.20556323707830876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3046697705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24723344,0.0000336693,0.7511718,0.00053072255,0.00007172663,0.00023279499,0.000022001976,0.00016311894,0.00054070103],"genre_scores_gemma":[0.99480987,0.0000031715663,0.004222037,0.0006453715,0.000038596005,0.000056240115,0.000016690166,0.000022504242,0.00018550959],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920684,0.00003405557,0.00022933898,0.00018522916,0.0001810277,0.00016351005],"domain_scores_gemma":[0.999428,0.00014397505,0.00002918915,0.00021491115,0.00006607526,0.0001179024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021857857,0.000121225654,0.00025186638,0.00020800166,0.000023650453,0.000019551611,0.00013982068,0.000031073814,0.00017460689],"category_scores_gemma":[0.00017625355,0.00011981127,0.00014723807,0.0009646922,0.000010680436,0.000051583414,0.000034615383,0.0000324906,0.000016595926],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003771549,0.000013505271,0.00052348844,0.000051386553,0.0006566491,0.0000031630198,0.00023314157,0.98279446,0.010487439,0.00022087633,0.004487731,0.00015099942],"study_design_scores_gemma":[0.0005657862,0.00007881144,0.0059261895,0.000008382983,0.00030595853,1.9809415e-8,0.000028721925,0.9380171,0.034023535,0.0000035293517,0.02089558,0.00014638952],"about_ca_topic_score_codex":0.000013793427,"about_ca_topic_score_gemma":0.000051168387,"teacher_disagreement_score":0.7475764,"about_ca_system_score_codex":0.00008977892,"about_ca_system_score_gemma":0.000027290684,"threshold_uncertainty_score":0.48857617},"labels":[],"label_agreement":null},{"id":"W3047120619","doi":"10.14288/1.0392602","title":"Bike Theft Reduction at UBC","year":2020,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reduction (mathematics); Computer science; Computer security; Mathematics","score_opus":0.0075740253015494675,"score_gpt":0.13875253329193632,"score_spread":0.13117850799038686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047120619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897955,0.000105290615,0.001185054,0.00019567627,0.00032762747,0.00009603856,0.000025039726,0.00035552285,0.007914249],"genre_scores_gemma":[0.998678,0.00015713715,0.00032516266,0.00003283725,0.00008645495,2.8141682e-7,0.000014944279,0.000018882743,0.00068625645],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994123,0.000013724758,0.000070226575,0.00020080975,0.00014511081,0.00015782236],"domain_scores_gemma":[0.9996777,0.0000064490646,0.000026563168,0.00015695965,0.000030892865,0.00010140724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000041613668,0.00003374269,0.00013537297,0.00002164291,0.000093599534,0.000030137073,0.00019429617,0.00005368395,0.0002790029],"category_scores_gemma":[0.0000058083633,0.00014449077,0.00007071708,0.00021846688,0.00006685048,0.00017560362,0.00012451815,0.00007378769,0.00010718715],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002376905,0.000078164114,0.008962627,0.00045982914,0.00034451293,0.00036997508,0.0013885493,0.07985387,0.008390872,0.000011374788,0.3619574,0.5381591],"study_design_scores_gemma":[0.0006190141,0.000043820208,0.96302485,0.00004104059,0.00004278791,0.000026825406,0.0008837525,0.012054926,0.000018132316,0.000036385725,0.022972712,0.00023577448],"about_ca_topic_score_codex":0.0065428396,"about_ca_topic_score_gemma":0.01919617,"teacher_disagreement_score":0.9540622,"about_ca_system_score_codex":0.00009560031,"about_ca_system_score_gemma":0.0000068915315,"threshold_uncertainty_score":0.9987009},"labels":[],"label_agreement":null},{"id":"W3047628545","doi":"10.1109/wf-iot48130.2020.9221240","title":"Demand Response for Residential Uses: A Data Analytics Approach","year":2020,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dynamic time warping; Smart grid; Demand response; Computer science; Analytics; Electricity; Mode (computer interface); Power consumption; Data analysis; Real-time computing; Database; Data mining; Power (physics); Human–computer interaction; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.11148067628272319,"score_gpt":0.28461550972136235,"score_spread":0.17313483343863917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047628545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002131078,0.00019890038,0.9884628,0.0004721265,0.0012581154,0.00073313597,0.00029663317,0.0008488004,0.0055984124],"genre_scores_gemma":[0.61417997,0.00044815324,0.37024283,0.0005023259,0.0034893504,0.0006358255,0.004849759,0.00051982654,0.005131954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982059,0.00006343403,0.00040493827,0.0007461281,0.00027275403,0.0003068391],"domain_scores_gemma":[0.9975107,0.00015614297,0.00005267919,0.0021238197,0.000036290476,0.00012039834],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00068438204,0.00033919862,0.00040203825,0.0001797412,0.00004110014,0.00019987927,0.0014575598,0.00022508079,0.000042578737],"category_scores_gemma":[0.00025716115,0.00035733552,0.00011469129,0.00014656688,0.000024703768,0.0001031412,0.0029536549,0.00033319194,0.000026059368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001928662,0.000013499101,0.000015772219,0.00057455245,0.00044320567,0.000008159167,0.0000496199,0.74540925,0.000040668492,0.00037809557,0.2528129,0.00006141962],"study_design_scores_gemma":[0.0003122345,0.000019430585,0.00029630886,0.000030486593,0.00025452327,0.0000012076376,0.00005316067,0.91567796,0.00012934861,0.00040243543,0.08244842,0.00037449514],"about_ca_topic_score_codex":0.000037117134,"about_ca_topic_score_gemma":0.000038269816,"teacher_disagreement_score":0.61822,"about_ca_system_score_codex":0.00010598489,"about_ca_system_score_gemma":0.00006573584,"threshold_uncertainty_score":0.9998879},"labels":[],"label_agreement":null},{"id":"W3048026270","doi":"10.1109/itec48692.2020.9161648","title":"Procurement of ILM in Deregulated Power Systems Using Computational Intelligence Tools","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Procurement; Artificial neural network; Electric power system; Fuzzy logic; Electricity; Energy management; Reliability engineering; Service (business); Software; Operations research; Power (physics); Artificial intelligence; Energy (signal processing); Engineering","score_opus":0.05181741268444844,"score_gpt":0.22669558363514564,"score_spread":0.1748781709506972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048026270","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21298766,0.00016172943,0.7819407,0.00007235839,0.00024794566,0.00026664566,0.000001794658,0.000162919,0.0041582575],"genre_scores_gemma":[0.99584484,0.0000020361495,0.004066986,0.000039600753,0.000012859848,0.0000060443185,0.0000055627447,0.000012669162,0.000009396937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993559,0.000010284666,0.0002646338,0.00009993194,0.00015945456,0.000109762565],"domain_scores_gemma":[0.9998381,0.000018259036,0.000020574475,0.000065767155,0.000023034203,0.000034274173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006125121,0.00007911264,0.000116269686,0.000057001434,0.000006857633,0.000017373866,0.0000846884,0.000023737008,0.00005681695],"category_scores_gemma":[0.000011054275,0.00008015273,0.000022500828,0.0002460992,0.000009659138,0.000082192564,0.000032229804,0.000042072683,0.0000101245805],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026490334,0.000009237958,0.00042879305,0.00008630199,0.000032731696,0.0000026082748,0.00018259151,0.99543816,0.0006922197,0.0028065825,0.0001866574,0.0001314458],"study_design_scores_gemma":[0.00008058274,0.0000142230965,0.0012120479,0.000043367516,0.0000044256503,6.979708e-7,0.00019188956,0.99522704,0.0026815042,0.00003137254,0.00042566468,0.000087171844],"about_ca_topic_score_codex":0.000027474383,"about_ca_topic_score_gemma":0.0000036951267,"teacher_disagreement_score":0.7828572,"about_ca_system_score_codex":0.00006394646,"about_ca_system_score_gemma":0.000009409891,"threshold_uncertainty_score":0.32685333},"labels":[],"label_agreement":null},{"id":"W3048668956","doi":"10.23977/jeis.2020.51005","title":"Research on Microgrid Power Direct Transaction Behavior Based on Blockchain","year":2020,"lang":"en","type":"article","venue":"Journal of Electronics and Information Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microgrid; Cluster analysis; Blockchain; Database transaction; Computer science; Electricity; Electricity market; Transaction data; Data mining; Database; Control (management); Engineering; Artificial intelligence; Computer security","score_opus":0.01784269261108904,"score_gpt":0.26927335663525986,"score_spread":0.2514306640241708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048668956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.971861,0.0001662928,0.0070371497,0.0018536854,0.00044450138,0.00016948067,0.000002628015,0.00004582043,0.01841946],"genre_scores_gemma":[0.999224,0.0001602401,0.00014298568,0.0004226191,0.000041260184,0.0000025824959,3.5993014e-7,0.0000036687813,0.0000022543918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887335,0.000014421089,0.00023105745,0.00005179316,0.00061941386,0.00020995784],"domain_scores_gemma":[0.9995766,0.000033871267,0.000054522883,0.00006849897,0.00016306943,0.000103425984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001118066,0.00006010227,0.00007552784,0.00041196065,0.00010911041,0.0001168725,0.00015768975,0.000022126407,0.000016254233],"category_scores_gemma":[0.000040591167,0.000050504037,0.000027040182,0.0006765686,0.000046357265,0.0007351114,0.0000070049596,0.0002896373,0.000008588222],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006278571,0.000024585685,0.00003562774,0.000015133349,0.0000057884777,0.0000016401222,0.00034669394,0.9746983,0.005582402,0.0013234232,0.0010941915,0.016809436],"study_design_scores_gemma":[0.00065704307,0.002489453,0.00396919,0.000039631323,0.000010739309,0.000009131731,0.00022294183,0.7781469,0.04014666,0.000011536839,0.17414118,0.00015558315],"about_ca_topic_score_codex":5.973492e-7,"about_ca_topic_score_gemma":3.5457407e-7,"teacher_disagreement_score":0.19655138,"about_ca_system_score_codex":0.00016324311,"about_ca_system_score_gemma":0.00008277443,"threshold_uncertainty_score":0.20594949},"labels":[],"label_agreement":null},{"id":"W3049564442","doi":"10.1016/j.epsr.2020.106625","title":"Identification of hot water end-use process of electric water heaters from energy measurements","year":2020,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"U.S. Department of Energy; National Science Foundation","keywords":"Unobservable; Markov chain; Markov process; Context (archaeology); Population; Process (computing); Demand response; Identification (biology); Engineering; Interval (graph theory); Mathematical optimization; Computer science; Mathematics; Electricity; Statistics; Econometrics","score_opus":0.05053343481197021,"score_gpt":0.27140683114291436,"score_spread":0.22087339633094416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3049564442","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9883653,0.0010615387,0.008427219,0.00009290443,0.00042914724,0.000492053,0.000008235571,0.0001666328,0.0009569536],"genre_scores_gemma":[0.9992669,0.00008019196,0.0000057084144,0.0000127372805,0.00009958508,0.00015415558,0.000044139677,0.00007206311,0.00026448202],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9959924,0.00031113747,0.0008032698,0.00043131746,0.0016136982,0.0008481569],"domain_scores_gemma":[0.9987361,0.00006171638,0.000057102217,0.0004956644,0.0004892837,0.00016017188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011009232,0.00022529995,0.0004039933,0.00069114653,0.00006533017,0.00009311022,0.0005832363,0.00011758232,0.00007631237],"category_scores_gemma":[0.000078265504,0.00016941874,0.000078774756,0.0011607424,0.000029963163,0.00026267534,0.00008420776,0.00026085,0.00007476225],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008312809,0.00005272739,0.00054437417,0.0002938183,0.00030554913,0.0000065554814,0.0009909311,0.02608208,0.9687044,0.000038836322,0.0026887394,0.00020888633],"study_design_scores_gemma":[0.00034633224,0.00014301075,0.000811789,0.00003672379,0.000020133039,0.000001154767,0.00006123735,0.03231574,0.9636869,0.000017375629,0.0023738942,0.000185714],"about_ca_topic_score_codex":0.0010329712,"about_ca_topic_score_gemma":0.0000060622306,"teacher_disagreement_score":0.010901622,"about_ca_system_score_codex":0.00023534455,"about_ca_system_score_gemma":0.000039769468,"threshold_uncertainty_score":0.69086957},"labels":[],"label_agreement":null},{"id":"W3080315628","doi":"10.1186/s42162-021-00137-9","title":"Investigating the performance gap between testing on real and denoised aggregates in non-intrusive load monitoring","year":2021,"lang":"en","type":"preprint","venue":"Energy Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Aggregate (composite); Computer science; Noise (video); CLARITY; Field (mathematics); Artificial neural network; Energy (signal processing); Machine learning; Data mining; Artificial intelligence; Algorithm; Mathematics; Statistics","score_opus":0.0232011901300245,"score_gpt":0.22172282024006248,"score_spread":0.19852163011003798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3080315628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9860548,0.00025516475,0.0005930872,0.000029643275,0.0009011749,0.00015932461,0.0000057491006,0.00023065259,0.011770402],"genre_scores_gemma":[0.990768,0.0011439284,0.0071426667,0.000059572463,0.00061772123,0.00011658021,0.000053193555,0.0000645272,0.000033776738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997942,0.00003612603,0.0008628092,0.00019779992,0.00047965758,0.00048166007],"domain_scores_gemma":[0.99853903,0.0003905729,0.0002649178,0.0005959427,0.00009941544,0.000110106615],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042262085,0.00047304595,0.00045190408,0.00020393029,0.00015525136,0.0003038142,0.00045119054,0.00025265175,0.0000019514257],"category_scores_gemma":[0.0001954207,0.00042449453,0.000053540913,0.0003757782,0.00007661657,0.00027769027,0.00087811187,0.0008945562,0.0000045393112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.515471e-7,0.0000039822485,0.025350574,0.0005923281,0.000090060144,0.0000057650864,0.0034673915,0.9513316,0.00003121658,0.000058561218,0.00003981947,0.019027857],"study_design_scores_gemma":[0.00038694145,0.00003856319,0.06200683,0.0030629663,0.000054697044,0.0000048525812,0.0019386489,0.9258367,0.0055380547,0.00010709358,0.00033102086,0.0006936458],"about_ca_topic_score_codex":0.0004068997,"about_ca_topic_score_gemma":0.000064228894,"teacher_disagreement_score":0.036656257,"about_ca_system_score_codex":0.00045648284,"about_ca_system_score_gemma":0.00008523385,"threshold_uncertainty_score":0.9998207},"labels":[],"label_agreement":null},{"id":"W3081650381","doi":"10.1109/sege49949.2020.9181985","title":"Multi-advisor Deep Reinforcement Learning for Thermostatically Controlled Heating in Smart Homes","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Computer science; Weighting; Schedule; Energy consumption; Set point; Set (abstract data type); Reduction (mathematics); Control (management); Demand response; Artificial intelligence; Machine learning; Engineering; Control engineering; Electricity; Mathematics","score_opus":0.015798705470148115,"score_gpt":0.2236927800176281,"score_spread":0.20789407454748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081650381","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023437275,0.00010489273,0.9648578,0.00074534904,0.00016400815,0.0009069764,2.4226108e-7,0.00052220316,0.009261209],"genre_scores_gemma":[0.97742254,0.000026439622,0.021085016,0.00059611496,0.00007214031,0.0003088061,0.00001330567,0.000049602884,0.0004260501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891603,0.000024205496,0.00039975028,0.00018576889,0.00013498456,0.00033927266],"domain_scores_gemma":[0.9995584,0.00019527305,0.0000282741,0.00010213451,0.000024628722,0.00009127149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018979282,0.00017588808,0.00032204774,0.00006729877,0.00004491651,0.000041245406,0.00011957885,0.000040326955,0.00016903349],"category_scores_gemma":[0.00024254034,0.00015987827,0.000082534185,0.00014404401,0.000010821131,0.000085869586,0.00004747881,0.00012690248,0.0000323841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007733324,0.0000103148095,0.00095103815,0.00008193182,0.00007768701,0.0000032720925,0.0005262887,0.9942514,0.0011991482,0.000615259,0.00024246848,0.001963902],"study_design_scores_gemma":[0.00591321,0.00009208161,0.0009224916,0.000016756456,0.00001586396,1.6890202e-7,0.0004754378,0.98860437,0.00054720725,0.000011161545,0.0032103457,0.0001908944],"about_ca_topic_score_codex":0.000021819891,"about_ca_topic_score_gemma":0.000041981708,"teacher_disagreement_score":0.9539853,"about_ca_system_score_codex":0.00006655019,"about_ca_system_score_gemma":0.000007153498,"threshold_uncertainty_score":0.65196466},"labels":[],"label_agreement":null},{"id":"W3082218290","doi":"10.1109/pmaps47429.2020.9183613","title":"Temperature Driven Bayesian Probabilistic Modelling of Electricity Demand, Capacity, and Adequacy","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Public Health","funders":"","keywords":"Probabilistic logic; Random variable; Computer science; Supply and demand; Duration (music); Electricity; Demand curve; Bayesian probability; Probability distribution; Capacity planning; Econometrics; Reliability engineering; Statistics; Engineering; Mathematics; Economics; Microeconomics","score_opus":0.01989818435379475,"score_gpt":0.17791718791622008,"score_spread":0.15801900356242532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082218290","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3838387,0.00014266555,0.6108813,0.00037315433,0.000062671425,0.00020397901,0.0000032778191,0.000305602,0.0041886424],"genre_scores_gemma":[0.99380195,0.000055443666,0.005898709,0.00011368292,0.00007288094,0.000008849602,0.0000031094544,0.000021137355,0.000024229024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993697,0.000014845685,0.0001702489,0.00016436596,0.00011588609,0.00016496358],"domain_scores_gemma":[0.9997061,0.000026430482,0.000015587413,0.00011580635,0.000020768985,0.00011532275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005155831,0.00012483132,0.00016986947,0.000043871936,0.000027047534,0.000019515306,0.000096465534,0.00005622913,0.000032674103],"category_scores_gemma":[0.000022670716,0.00011679659,0.00002907808,0.00021210269,0.000021583299,0.0000777186,0.00003874571,0.00012594259,0.0000030671633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035062353,0.0000069079047,0.00029569352,0.00021795338,0.00003523063,0.0000019344689,0.00020552297,0.991487,0.0027371475,0.0043408205,0.0005534341,0.000114851995],"study_design_scores_gemma":[0.00016816104,0.000032679025,0.00010345584,0.000010730551,0.000021534694,0.000001316769,0.000019197452,0.99349916,0.0050951834,0.00046520217,0.00045174954,0.00013164495],"about_ca_topic_score_codex":0.000022914484,"about_ca_topic_score_gemma":0.000016076185,"teacher_disagreement_score":0.60996324,"about_ca_system_score_codex":0.000026710362,"about_ca_system_score_gemma":0.0000064099413,"threshold_uncertainty_score":0.47628266},"labels":[],"label_agreement":null},{"id":"W3082847660","doi":"10.1109/tpwrs.2020.3020856","title":"Integrating Net Benefits Test for Demand Response Into Optimal Power Flow Formulation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Implementation; Procurement; Computer science; Power flow; Demand response; Electric power system; Reliability engineering; Operations research; Payment; Economics; Mathematical optimization; Power (physics); Electrical engineering; Engineering; Electricity; Mathematics","score_opus":0.012887198309908567,"score_gpt":0.21277737668644545,"score_spread":0.1998901783765369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082847660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03819076,0.00013666478,0.95713156,0.00025118512,0.0025738971,0.0006340256,0.000072872834,0.00057489995,0.0004341161],"genre_scores_gemma":[0.99547243,0.0000062680106,0.003846467,0.00009728298,0.00005905588,0.0002817412,0.000009762474,0.0000881811,0.00013878605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869615,0.000045596036,0.00043354844,0.00030310432,0.00022960937,0.00029198074],"domain_scores_gemma":[0.99913836,0.0003184858,0.000047883852,0.00026977673,0.00007447864,0.00015104515],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002841764,0.00027254914,0.00025851373,0.0001630189,0.00016595508,0.0001136229,0.0001651078,0.0001258369,0.000034920122],"category_scores_gemma":[0.000033169552,0.0002770226,0.0001314585,0.00028836526,0.000012490648,0.0002732848,0.0000016964163,0.00018592125,0.00006274461],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019122002,0.000030496283,0.000008974604,0.000086988846,0.00008912939,0.000002585029,0.0012440184,0.99287647,0.003351002,0.00010946504,0.0017290025,0.00028065543],"study_design_scores_gemma":[0.0006851399,0.0004519712,0.00009930482,0.000109080516,0.000043289743,0.0000054620828,0.00043879237,0.97705823,0.0069417027,0.0000029080923,0.013843444,0.00032069185],"about_ca_topic_score_codex":0.00001672539,"about_ca_topic_score_gemma":0.000020554344,"teacher_disagreement_score":0.9572817,"about_ca_system_score_codex":0.00017394863,"about_ca_system_score_gemma":0.00001708488,"threshold_uncertainty_score":0.9999682},"labels":[],"label_agreement":null},{"id":"W3084675714","doi":"10.1016/j.apenergy.2020.115851","title":"Optimal residential users coordination via demand response: An exact distributed framework","year":2020,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Ministerio de Ciencia, Innovación y Universidades","keywords":"News aggregator; Bilevel optimization; Scalability; Demand response; Computer science; Exploit; Mathematical optimization; Profit (economics); Linear programming; Karush–Kuhn–Tucker conditions; Integer programming; Operations research; Distributed computing; Optimization problem; Engineering; Computer security; Database; Algorithm; Mathematics; Microeconomics; Economics","score_opus":0.008047011418084681,"score_gpt":0.20609860564006832,"score_spread":0.19805159422198365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084675714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20743375,0.000036389516,0.7900453,0.00040769446,0.00029164492,0.00007263658,0.00001011082,0.00073655794,0.00096588157],"genre_scores_gemma":[0.9945969,0.000015748697,0.0042103357,0.00030438785,0.00048680193,0.00007064706,0.00020374505,0.0000765725,0.000034849054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987379,0.00005201712,0.00025899842,0.0003404738,0.00026762756,0.00034298992],"domain_scores_gemma":[0.99930525,0.00008544228,0.000039407598,0.00033303548,0.00002206284,0.00021478334],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001466164,0.00023691879,0.0002050111,0.00008288754,0.00008888758,0.00007998662,0.0002823274,0.00015808774,0.0001451248],"category_scores_gemma":[0.0000337226,0.00027541065,0.00004918762,0.00041820604,0.000033769065,0.00015804217,0.000086342734,0.00016269325,0.000044302345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029626294,0.000019010513,0.000023251036,0.000013892314,0.0000794478,0.000018274535,0.00013389393,0.9660469,0.01331976,0.010357454,0.008738014,0.0009537821],"study_design_scores_gemma":[0.0012525693,0.00021221182,0.0062647546,0.0000205818,0.00010454051,0.000004091643,0.00021448327,0.76490134,0.061798654,0.0011807285,0.16303492,0.0010111224],"about_ca_topic_score_codex":0.00003408395,"about_ca_topic_score_gemma":0.000012694495,"teacher_disagreement_score":0.78716314,"about_ca_system_score_codex":0.000104933686,"about_ca_system_score_gemma":0.000011973851,"threshold_uncertainty_score":0.9999698},"labels":[],"label_agreement":null},{"id":"W3085049125","doi":"10.1016/j.est.2020.101853","title":"Techno-economic study driven based on available efficiency index for optimal operation of a smart grid in the presence of energy storage system","year":2020,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Energy storage; Smart grid; Renewable energy; Reliability engineering; Profit (economics); Electric power system; Tariff; Computer science; Environmental economics; Engineering; Power (physics); Electrical engineering; Economics; Microeconomics","score_opus":0.011936229891302705,"score_gpt":0.2036880429560495,"score_spread":0.1917518130647468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085049125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7642005,0.00022714747,0.23220626,0.00017721808,0.0011255398,0.0003827204,0.00002533021,0.00005988378,0.0015953885],"genre_scores_gemma":[0.9990885,0.000014303473,0.00046662995,0.000050660838,0.00026067687,0.00004838637,0.0000036569502,0.000035709058,0.00003144132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982386,0.00012397293,0.00082137814,0.0001965748,0.00039991678,0.00021955105],"domain_scores_gemma":[0.99897915,0.00017827227,0.0003535823,0.0003356365,0.00008573842,0.000067607776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006720103,0.00020927734,0.000466459,0.0003525761,0.00004479194,0.00003153082,0.00062215107,0.00007548842,0.000022650082],"category_scores_gemma":[0.000053823926,0.00016987493,0.00013801726,0.0003018606,0.00003342775,0.00019321968,0.000052194006,0.00016969189,0.0000011804462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017512328,0.00019435045,0.0007040927,0.000100737205,0.000074888245,0.000034982033,0.0002555029,0.99461275,0.0010531432,0.00090347277,0.0018066989,0.00008425785],"study_design_scores_gemma":[0.0014523427,0.0014664021,0.0006499846,0.00011032587,0.000045888548,0.000004739616,0.0007055122,0.9876318,0.0036010374,0.0000016131518,0.0041757273,0.00015461301],"about_ca_topic_score_codex":0.00016266028,"about_ca_topic_score_gemma":0.00010407109,"teacher_disagreement_score":0.23488802,"about_ca_system_score_codex":0.00026173337,"about_ca_system_score_gemma":0.00008564421,"threshold_uncertainty_score":0.69272983},"labels":[],"label_agreement":null},{"id":"W3085840227","doi":"10.3390/electronics9091517","title":"Characterizing the Effect of Conservation Voltage Reduction on the Hosting Capacity of Inverter-Based Distributed Energy Resources","year":2020,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"ATCO (Canada)","funders":"","keywords":"Distributed generation; Renewable energy; Grid; Subsidy; Environmental economics; AC power; Inverter; Electrical engineering; Mandate; Engineering; Voltage; Reliability engineering; Business; Economics; Political science","score_opus":0.010867488715412061,"score_gpt":0.17599289272138366,"score_spread":0.1651254040059716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085840227","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99132574,0.0001676008,0.0068492326,0.0012076591,0.000104684455,0.00011710935,0.000009284388,0.000093033384,0.00012565881],"genre_scores_gemma":[0.99960035,0.00003115979,0.00000990705,0.00019284138,0.00009140438,0.000021761763,0.000031540883,0.000018279681,0.0000027336],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992592,0.00009849612,0.00019897698,0.00010591931,0.00016549046,0.00017196465],"domain_scores_gemma":[0.99943423,0.00022220046,0.00009972057,0.00020079043,0.00002303485,0.000020033283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002634303,0.000117019474,0.00014413006,0.000027234082,0.00006269463,0.00001292857,0.00016672074,0.000038005073,0.0000064171672],"category_scores_gemma":[0.00012614406,0.00007756842,0.0000546053,0.0002872753,0.000044137636,0.000040245544,0.000019840825,0.00016214047,8.910557e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014179054,0.00001664502,0.0010879704,0.00022177532,0.00018483844,7.4553503e-7,0.00065940944,0.19928768,0.78987736,0.0027387238,0.002718607,0.003064444],"study_design_scores_gemma":[0.00018926954,0.0002970002,0.0014011278,0.000036324378,0.000031910567,4.030825e-7,0.000031577194,0.26805001,0.7148549,0.00001947405,0.015010507,0.00007749044],"about_ca_topic_score_codex":0.000039266164,"about_ca_topic_score_gemma":0.000012218932,"teacher_disagreement_score":0.07502245,"about_ca_system_score_codex":0.000075751304,"about_ca_system_score_gemma":0.000009848292,"threshold_uncertainty_score":0.31631485},"labels":[],"label_agreement":null},{"id":"W3086698630","doi":"10.1007/s00202-020-01078-4","title":"Non-intrusive load monitoring using multi-label classification methods","year":2020,"lang":"en","type":"article","venue":"Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Computer science; Classifier (UML); Field (mathematics); Machine learning; Power consumption; Artificial intelligence; Statistical classification; Data mining; Energy consumption; Power (physics); Engineering","score_opus":0.0559993872311573,"score_gpt":0.30041294136528257,"score_spread":0.24441355413412527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086698630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048025593,0.0006030057,0.9490668,0.000066409695,0.00076861767,0.00016829153,7.572603e-7,0.0009876788,0.0003128274],"genre_scores_gemma":[0.6337001,0.00006620518,0.3652663,0.000040255654,0.00075897697,0.000037452402,0.0000024563644,0.00011024765,0.00001802213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985904,0.000017318975,0.000317574,0.00031447943,0.0002537251,0.00050651847],"domain_scores_gemma":[0.9993989,0.000074112264,0.00003086495,0.0002112477,0.000052676907,0.0002321813],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016015166,0.0002820161,0.00027324384,0.00012642973,0.000053016778,0.000055236073,0.0002388884,0.00011591379,0.000011788017],"category_scores_gemma":[0.00018315623,0.00032692208,0.0000688962,0.0009092739,0.000008705987,0.0001774974,0.000062687664,0.00039943424,0.000041244053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036648403,0.000012646371,0.00017755036,0.000050603358,0.00006905305,0.000008803751,0.00012074326,0.6781203,0.3076361,0.000120921846,0.00007898067,0.013600625],"study_design_scores_gemma":[0.0003797861,0.000024792824,0.0016535362,0.000020084988,0.000032334774,0.0000028741797,0.0000117442805,0.93926966,0.0563413,0.0000024511958,0.0019398949,0.0003215286],"about_ca_topic_score_codex":0.000008768088,"about_ca_topic_score_gemma":1.5984374e-7,"teacher_disagreement_score":0.58567446,"about_ca_system_score_codex":0.0005407075,"about_ca_system_score_gemma":0.000023470415,"threshold_uncertainty_score":0.9999183},"labels":[],"label_agreement":null},{"id":"W3087493083","doi":"10.3934/electreng.2020.3.326","title":"Implementation of non-intrusive appliances load monitoring (NIALM) on k-nearest neighbors (k-NN) classifier","year":2020,"lang":"en","type":"article","venue":"AIMS Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"Kungliga Tekniska Högskolan; Swedish Foundation for International Cooperation in Research and Higher Education; Styrelsen för Internationellt Utvecklingssamarbete","keywords":"Classifier (UML); Computer science; k-nearest neighbors algorithm; Benchmark (surveying); Power consumption; Voltage; Artificial intelligence; Pattern recognition (psychology); Data mining; Machine learning; Power (physics); Engineering","score_opus":0.006981905099905404,"score_gpt":0.21410069520915778,"score_spread":0.20711879010925238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087493083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93935174,0.0028279354,0.055078708,0.00030355327,0.00045860076,0.0004207506,0.0000053547524,0.00044222677,0.0011111095],"genre_scores_gemma":[0.99784935,0.0011386066,0.00049560744,0.00005385094,0.00034498193,0.000046732475,0.0000046709147,0.000058012134,0.000008195904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985718,0.0000068637983,0.00030211458,0.0002804559,0.00028688426,0.0005518438],"domain_scores_gemma":[0.9995696,0.00006027147,0.000041497653,0.00013887261,0.00003576194,0.00015401703],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008215434,0.00025573286,0.00028166772,0.000096800926,0.000045673136,0.00003765533,0.0001512865,0.00008297403,0.00001388968],"category_scores_gemma":[0.000020894224,0.0002725686,0.00006095939,0.00051179883,0.000012145101,0.0001085952,0.000037679663,0.0003370415,0.000008089137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000432653,0.000025244008,0.0021180098,0.00020860275,0.0002746935,0.0000114151,0.00034123412,0.8591153,0.071253344,0.0055044983,0.0006649272,0.060439482],"study_design_scores_gemma":[0.0008654867,0.0006437039,0.007623825,0.00004090567,0.00005930321,0.0000028169954,0.000063432395,0.82448655,0.14799233,0.00005306327,0.017638449,0.00053014],"about_ca_topic_score_codex":0.000023871042,"about_ca_topic_score_gemma":0.000005341105,"teacher_disagreement_score":0.07673898,"about_ca_system_score_codex":0.00024226095,"about_ca_system_score_gemma":0.000039710067,"threshold_uncertainty_score":0.99997264},"labels":[],"label_agreement":null},{"id":"W3091196590","doi":"10.1109/ijcnn48605.2020.9207081","title":"Reinforcement Mechanism Design for Electric Vehicle Demand Response in Microgrid Charging Stations","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Reinforcement learning; Dynamic pricing; Markov decision process; Revenue; Computer science; Demand response; Revenue management; Electricity pricing; Mechanism design; Electricity; Q-learning; Lagrangian relaxation; Microgrid; Charging station; Operations research; Markov process; Scheduling (production processes); Electric vehicle; Electricity market; Microeconomics; Mathematical optimization; Business; Economics; Control (management); Engineering; Power (physics)","score_opus":0.021802321027688826,"score_gpt":0.2156612384326627,"score_spread":0.19385891740497385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3091196590","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07031054,0.00008450117,0.92763525,0.00075027405,0.00010036826,0.00052385824,0.0000018337425,0.00029514794,0.00029823044],"genre_scores_gemma":[0.98558044,0.000058418096,0.013332623,0.0005463997,0.000058917456,0.00024486592,0.000008703336,0.000037134192,0.00013250875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921083,0.000033531294,0.00021748144,0.00015502135,0.000097053424,0.00028607305],"domain_scores_gemma":[0.9996492,0.00013635124,0.00001621077,0.00011008303,0.000016976559,0.00007114406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033011162,0.00011696964,0.0001135041,0.00014235874,0.000042016316,0.000030109717,0.00010748109,0.000030956944,0.000054085893],"category_scores_gemma":[0.000053415883,0.00012723722,0.000032244647,0.00033681275,0.000003175781,0.00009617302,0.000024114184,0.000062432526,0.000033415112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015189478,0.0000059240087,0.0000075015946,0.00002869425,0.00002591202,0.000003912497,0.00028408263,0.87687385,0.11589909,0.003202658,0.0032090729,0.00030737327],"study_design_scores_gemma":[0.0006025245,0.00012626135,0.00016203786,0.00000634273,0.000009500133,3.2795e-7,0.000067117115,0.8685728,0.12560044,0.0001911025,0.004522284,0.00013926763],"about_ca_topic_score_codex":0.000005468995,"about_ca_topic_score_gemma":0.0000032305434,"teacher_disagreement_score":0.9152699,"about_ca_system_score_codex":0.00011728225,"about_ca_system_score_gemma":0.000015667041,"threshold_uncertainty_score":0.5188583},"labels":[],"label_agreement":null},{"id":"W3093502878","doi":"10.1016/j.ijepes.2020.106561","title":"Optimal planning and investment benefit analysis of shared energy storage for electricity retailers","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada School of Energy and Environment","keywords":"Energy storage; Investment (military); Electricity; Environmental economics; Investment analysis; Business; Electricity market; Energy (signal processing); Electricity retailing; Computer science; Operations research; Industrial organization; Economics; Electrical engineering; Finance; Engineering; Power (physics); Financial risk; Mathematics","score_opus":0.01415395892548893,"score_gpt":0.22631338260575268,"score_spread":0.21215942368026375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3093502878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21632789,0.009745807,0.76943743,0.00045064444,0.0018720287,0.00012961702,0.00006496252,0.00010464238,0.0018669618],"genre_scores_gemma":[0.99839705,0.00012317914,0.0006580246,0.0003109499,0.00037235182,0.000014422521,0.00002930052,0.000033020395,0.00006170946],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997975,0.000041087445,0.00085924997,0.00020817616,0.0006525811,0.0002639065],"domain_scores_gemma":[0.99873286,0.00018187865,0.00037543138,0.0001094667,0.000384872,0.00021550246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020867867,0.00021443194,0.00058079045,0.0007986561,0.00002788192,0.00007858777,0.0004387531,0.00009460977,0.000016740525],"category_scores_gemma":[0.00009014024,0.00020463661,0.00028045964,0.00075721194,0.00002251827,0.00019493824,0.000050327173,0.00013924514,2.4934053e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001468834,0.000037777703,0.0005300394,0.000011318688,0.004977234,0.000044354005,0.0001314974,0.96973103,0.0031509146,0.017284825,0.0036416296,0.00031247822],"study_design_scores_gemma":[0.00077308156,0.00043923408,0.0012896303,0.000044003926,0.00048165128,0.000022193473,0.00004524212,0.95586675,0.002082901,0.00006817422,0.03864975,0.00023736483],"about_ca_topic_score_codex":0.00006696372,"about_ca_topic_score_gemma":0.000004289997,"teacher_disagreement_score":0.78206915,"about_ca_system_score_codex":0.0002688582,"about_ca_system_score_gemma":0.000033383654,"threshold_uncertainty_score":0.83448386},"labels":[],"label_agreement":null},{"id":"W3095159772","doi":"10.1016/j.est.2020.102022","title":"The role of energy storage and demand response as energy democracy policies in the energy productivity of hybrid hub system considering social inconvenience cost","year":2020,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Environmental economics; Efficient energy use; Energy accounting; Energy management; Computer science; Energy (signal processing); Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.009318020520136337,"score_gpt":0.2061307808582054,"score_spread":0.19681276033806908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3095159772","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97744286,0.0049815285,0.0141533185,0.001348329,0.000592573,0.00007156454,0.000014112826,0.000054068092,0.0013416194],"genre_scores_gemma":[0.99842227,0.00060122303,0.00007628422,0.00020361101,0.00056349154,0.000019460591,0.0000018877721,0.000055273445,0.000056494206],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99675244,0.0007860606,0.0010499596,0.00026997845,0.0006997337,0.00044182152],"domain_scores_gemma":[0.99785495,0.00073780195,0.0006923092,0.00037435198,0.0001877712,0.00015279258],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013415791,0.00035293112,0.00069694384,0.0003055321,0.00024493365,0.000079556885,0.00068744534,0.00008881924,0.0000045421443],"category_scores_gemma":[0.00029821738,0.00026380096,0.00018400679,0.00055918464,0.00029907617,0.00035911496,0.000227903,0.0002634494,2.0302677e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017267666,0.0001770108,0.0010515405,0.00022945201,0.00069229177,0.00067982916,0.0033946359,0.78968984,0.06604482,0.12656303,0.0025252418,0.0072255214],"study_design_scores_gemma":[0.0041321935,0.0014452257,0.010994123,0.00064829545,0.00043940247,0.0015531091,0.013262459,0.14281026,0.38614053,0.0037732203,0.43315396,0.001647227],"about_ca_topic_score_codex":0.00076530443,"about_ca_topic_score_gemma":0.00031101244,"teacher_disagreement_score":0.6468796,"about_ca_system_score_codex":0.00022379764,"about_ca_system_score_gemma":0.00015045003,"threshold_uncertainty_score":0.9999814},"labels":[],"label_agreement":null},{"id":"W3096591327","doi":"10.3390/en13215782","title":"Power Loss-Aware Transactive Microgrid Coalitions under Uncertainty","year":2020,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transactive memory; Microgrid; Enabling; Computer science; Game theory; Electricity; Environmental economics; Electric power system; Risk analysis (engineering); Distributed computing; Operations research; Power (physics); Reliability engineering; Business; Microeconomics; Economics; Engineering; Artificial intelligence; Knowledge management; Electrical engineering; Control (management)","score_opus":0.009985587206303426,"score_gpt":0.19365295916609052,"score_spread":0.18366737195978708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096591327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8492028,0.001646251,0.09804378,0.008786249,0.002320888,0.00032753177,0.00020076489,0.0037522465,0.035719503],"genre_scores_gemma":[0.9984115,0.00012817833,0.0002955255,0.00072734436,0.00016437608,0.000034473098,0.000035404617,0.000043497774,0.00015974329],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99926513,0.000018256464,0.00014620385,0.00018784657,0.00013793168,0.00024460856],"domain_scores_gemma":[0.99965787,0.00003567272,0.000012995365,0.00017308167,0.000024904662,0.00009548978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000028460685,0.00017323997,0.00015034567,0.00004612904,0.00005847152,0.000038847018,0.00015613156,0.000052805262,0.00052799855],"category_scores_gemma":[0.000004646058,0.00017765242,0.00008225948,0.0001950354,0.00005284812,0.00012578347,0.000026184503,0.00011735318,0.00010282444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006486186,0.000009814346,0.000023812736,0.000021027534,0.00011219228,0.000013037707,0.00052144803,0.9825974,0.000910185,0.0033223224,0.01224458,0.00021767212],"study_design_scores_gemma":[0.0011649032,0.00011033615,0.0026539294,0.000050046507,0.000096837764,0.0000075031994,0.004700787,0.08353076,0.0348127,0.00077373855,0.8710032,0.001095273],"about_ca_topic_score_codex":0.000027951834,"about_ca_topic_score_gemma":0.00002356412,"teacher_disagreement_score":0.8990667,"about_ca_system_score_codex":0.00006993084,"about_ca_system_score_gemma":0.000011463929,"threshold_uncertainty_score":0.7244455},"labels":[],"label_agreement":null},{"id":"W3097774950","doi":"10.11591/ijeecs.v17.i2.pp1005-1013","title":"Robust operation of microgrid energy system under uncertainties and demand response program","year":2020,"lang":"en","type":"article","venue":"Indonesian Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Microgrid; Demand response; Robust optimization; Mathematical optimization; Robustness (evolution); Renewable energy; Computer science; Linear programming; Photovoltaic system; Electric power system; Scheduling (production processes); Integer programming; Stochastic programming; Reliability engineering; Control theory (sociology); Electricity; Power (physics); Engineering; Mathematics","score_opus":0.008859732064040433,"score_gpt":0.17849053134282736,"score_spread":0.16963079927878694,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097774950","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40267614,0.00078552146,0.59620404,0.00010755208,0.00014044535,0.000031612166,1.6204874e-7,0.000050609775,0.0000039263277],"genre_scores_gemma":[0.9858485,0.000072738585,0.013905942,0.000027695065,0.00013257244,0.000002012112,1.13802045e-7,0.0000098932815,5.53676e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915224,0.000022889453,0.0002888169,0.00012770754,0.00021904126,0.00018929207],"domain_scores_gemma":[0.9995875,0.000054222917,0.000051730436,0.00006597827,0.00007203929,0.00016856503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033713598,0.00011311849,0.00020204668,0.00022003932,0.000043199576,0.00009713003,0.00017748716,0.00003120714,2.4202552e-7],"category_scores_gemma":[0.000016643615,0.000099335535,0.00002880249,0.00052012474,0.00006499571,0.00019252571,0.000045203098,0.00011194855,9.0721905e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035749847,0.000008669203,0.000085976004,0.000056134133,0.000025134834,0.000016407355,0.000094043586,0.9774153,0.00751243,0.0011091365,0.000030214916,0.013610763],"study_design_scores_gemma":[0.00026682313,0.00041585654,0.003450477,0.000058837388,0.000012723452,0.00013911727,0.000023201557,0.99000293,0.0053324266,0.0000027131298,0.0001922026,0.00010268175],"about_ca_topic_score_codex":0.0000016229333,"about_ca_topic_score_gemma":1.08952e-7,"teacher_disagreement_score":0.5831723,"about_ca_system_score_codex":0.000050002924,"about_ca_system_score_gemma":0.000035916335,"threshold_uncertainty_score":0.40507856},"labels":[],"label_agreement":null},{"id":"W3099459877","doi":"10.1002/9781119508311.ch31","title":"Research with Disaggregated Electricity End‐Use Data in Households","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Ontario Centres of Excellence","keywords":"Sketch; Electricity; Electricity system; Order (exchange); Energy (signal processing); Set (abstract data type); Environmental economics; Key (lock); Data science; Computer science; Business; Economics; Electricity generation; Engineering; Power (physics); Computer security; Electrical engineering; Finance","score_opus":0.07060228839387347,"score_gpt":0.2805670142566099,"score_spread":0.20996472586273643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099459877","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005937039,0.00042144186,0.0017961925,0.000033577864,0.0003106734,0.00055811845,0.000059464288,0.0012754943,0.9949513],"genre_scores_gemma":[0.018578753,0.00088775833,0.0009802947,0.000028602783,0.00025016684,0.000042967637,0.00039369657,0.0011814538,0.9776563],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981523,0.00006460709,0.00016116888,0.00051750056,0.0005382759,0.0005661583],"domain_scores_gemma":[0.9976265,0.00008829143,0.000022609634,0.0021858152,0.000015181866,0.00006161581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037715104,0.00027568827,0.00029575214,0.0007031063,0.000012581061,0.000082976476,0.00095564255,0.00022946541,0.0007961565],"category_scores_gemma":[0.00002578788,0.00022852929,0.000014630679,0.000986676,0.00004235,0.00013466363,0.0003760102,0.0005671587,0.00047375663],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074776126,0.000029671008,0.0014399266,0.00012634107,0.0001288913,0.000045763925,0.00000697205,0.013609099,0.000008299942,0.00044196192,0.9834739,0.0006816827],"study_design_scores_gemma":[0.0003911767,0.00003009792,0.0015739668,0.0001999961,0.000012560261,0.0000014716856,0.000010450988,0.016505374,0.00005280819,0.0000029730109,0.980864,0.00035513492],"about_ca_topic_score_codex":0.005892985,"about_ca_topic_score_gemma":0.013306324,"teacher_disagreement_score":0.01798505,"about_ca_system_score_codex":0.00017738553,"about_ca_system_score_gemma":0.000036662284,"threshold_uncertainty_score":0.93191534},"labels":[],"label_agreement":null},{"id":"W3099654264","doi":"","title":"1Distributed Real-Time Power Balancing in Renewable-Integrated Power Grids with Storage and Flexible Loads","year":2016,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed power; Distributed generation; Renewable energy; Computer science; Power (physics); Electric power system; Distributed data store; Energy storage; Load balancing (electrical power); Distributed computing; Electrical engineering; Grid; Engineering; Voltage; Mathematics; Physics","score_opus":0.0032594977298024148,"score_gpt":0.17325632255294818,"score_spread":0.16999682482314576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099654264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81594133,0.0000760013,0.06238029,0.00028772783,0.00036165718,0.0002593014,0.000031286396,0.0014229703,0.119239405],"genre_scores_gemma":[0.9907923,0.00006197075,0.0011231998,0.000037174184,0.0000264542,0.00002163994,0.000021583803,0.000058425805,0.007857255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99882555,0.000024417393,0.00023653108,0.00029753413,0.00018038807,0.0004355549],"domain_scores_gemma":[0.9994167,0.000052905725,0.000023872653,0.0003520514,0.000040254556,0.00011421231],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001926464,0.0002532257,0.00025277206,0.00018480959,0.000028932407,0.000043306147,0.00012753464,0.00008591111,0.00092925807],"category_scores_gemma":[0.000018670205,0.00016410695,0.000022833501,0.00041423718,0.000032215165,0.0002324421,0.00005839261,0.00008204957,0.00007630125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047748417,0.00022553475,0.061606664,0.00016464018,0.0006557475,0.00065344217,0.00055364985,0.44376,0.2503644,0.0043952605,0.23541231,0.0017308552],"study_design_scores_gemma":[0.02079917,0.0017853763,0.32963297,0.0026835934,0.00019422779,0.00017205506,0.0013902796,0.15934725,0.1572809,0.0005904723,0.31967065,0.0064530545],"about_ca_topic_score_codex":0.000538509,"about_ca_topic_score_gemma":0.0003096772,"teacher_disagreement_score":0.28441274,"about_ca_system_score_codex":0.00025551,"about_ca_system_score_gemma":0.000021037618,"threshold_uncertainty_score":0.999984},"labels":[],"label_agreement":null},{"id":"W3099701611","doi":"10.1109/ojcoms.2020.3038590","title":"Fast Big Data Analytics for Smart Meter Data","year":2020,"lang":"en","type":"article","venue":"IEEE Open Journal of the Communications Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Cluster analysis; Computer science; Reduction (mathematics); Metric (unit); Dimensionality reduction; Big data; Dimension (graph theory); Computational complexity theory; Projection (relational algebra); Cluster (spacecraft); Data mining; Algorithm; Artificial intelligence; Mathematics; Engineering","score_opus":0.4113885549947741,"score_gpt":0.3471047353393338,"score_spread":0.06428381965544033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099701611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031218946,0.003649496,0.8329335,0.14081177,0.0056915493,0.0016900066,0.0017327617,0.00014323712,0.010225802],"genre_scores_gemma":[0.6444823,0.004596251,0.343955,0.0045903255,0.0013181487,0.000023686429,0.00038946376,0.00012538047,0.00051941845],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99910206,0.00007316289,0.00040285988,0.0001207098,0.00016863762,0.0001325796],"domain_scores_gemma":[0.9938068,0.00018620947,0.00017565998,0.0056528575,0.0001023813,0.000076132405],"candidate_categories":["open_science"],"consensus_categories":[],"category_scores_codex":[0.00093308126,0.00010415914,0.00019986076,0.000013967084,0.0002228696,0.00018879629,0.019327074,0.00003631386,0.000008737722],"category_scores_gemma":[0.00011833275,0.0000798947,0.00012765087,0.0002832122,0.00007532676,0.0005342414,0.006264759,0.00031461345,0.000005957771],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061063565,0.000040450228,0.00019496823,0.00002966131,0.000853813,2.1702942e-7,0.00048588216,0.06313901,0.00043239756,0.00011448989,0.9298494,0.0048536207],"study_design_scores_gemma":[0.00033858986,0.000012708649,0.00015022891,0.000027061296,0.00020047402,0.0000035685282,0.00032047543,0.4777395,0.00013598552,0.000063621184,0.5209207,0.0000871079],"about_ca_topic_score_codex":0.000011616041,"about_ca_topic_score_gemma":0.00004858523,"teacher_disagreement_score":0.6413604,"about_ca_system_score_codex":0.00005848283,"about_ca_system_score_gemma":0.00006135095,"threshold_uncertainty_score":0.98597884},"labels":[],"label_agreement":null},{"id":"W3101018449","doi":"10.1109/iecon43393.2020.9254932","title":"Deployment of Multiple Demand Response Programs Using Data-Driven Multi-Step Method with Elasticity","year":2020,"lang":"en","type":"article","venue":"IECON 2020 The 46th Annual Conference of the IEEE Industrial Electronics Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; École de Technologie Supérieure","funders":"","keywords":"Software deployment; Relocation; Computer science; Cluster analysis; Visibility; Elasticity (physics); Process (computing); MATLAB; Selection (genetic algorithm); Pricing strategies; Operations research; Mathematical optimization; Artificial intelligence; Business; Marketing; Engineering","score_opus":0.10877856879075151,"score_gpt":0.2783220001230719,"score_spread":0.1695434313323204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101018449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7827561,0.00016226801,0.21394247,0.001124124,0.0004893353,0.001143488,0.00021215153,0.00014718025,0.000022870163],"genre_scores_gemma":[0.99025816,0.000057015637,0.009207916,0.00011394321,0.0002354331,0.00002528736,0.000017060958,0.000057053596,0.000028121727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99756104,0.00042802325,0.0005595161,0.0004205105,0.0004881198,0.00054280774],"domain_scores_gemma":[0.99814177,0.00038054425,0.00031478575,0.0008313991,0.00020194356,0.00012954073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010627395,0.00033364163,0.0004945766,0.000018338234,0.00014697418,0.00005804258,0.0015572294,0.00020657567,0.000013686198],"category_scores_gemma":[0.00027644215,0.000220378,0.00019277472,0.00051748677,0.00022089212,0.00022223138,0.00039862414,0.00081473606,0.0000016436121],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00094074826,0.00009609464,0.0010087673,0.00007858417,0.0009780511,0.0000017937078,0.0025307166,0.9733031,0.015089205,0.000060254923,0.0036789186,0.002233757],"study_design_scores_gemma":[0.00201838,0.00038088136,0.00015339027,0.0000832435,0.00029000506,0.000004159973,0.0012948465,0.9628953,0.02859023,0.000009302237,0.0040078624,0.00027244352],"about_ca_topic_score_codex":0.000176886,"about_ca_topic_score_gemma":0.00020504283,"teacher_disagreement_score":0.20750205,"about_ca_system_score_codex":0.00018652451,"about_ca_system_score_gemma":0.00051231065,"threshold_uncertainty_score":0.89867544},"labels":[],"label_agreement":null},{"id":"W3105897984","doi":"10.1002/9781119508311.ch27","title":"Who Gains from Hourly Time‐of‐Use Retail Prices on Electricity? An Analysis of Consumption Profiles for Categories of Danish Electricity Customers","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Consumption (sociology); Flexibility (engineering); Electricity; Incentive; Dynamic pricing; Electricity pricing; Load profile; Environmental economics; Electricity market; Economics; Business; Econometrics; Agricultural economics; Microeconomics; Engineering","score_opus":0.019422434858602042,"score_gpt":0.2354724152528687,"score_spread":0.21604998039426665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105897984","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6507776,0.001968593,0.087564014,0.000022900205,0.00096957776,0.0047675427,0.003546869,0.0018024746,0.24858046],"genre_scores_gemma":[0.6816489,0.0032238553,0.009479781,0.00006527244,0.00040027374,0.00025793136,0.0046904185,0.0014885172,0.29874507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983314,0.000048489444,0.0005377163,0.0004068005,0.00037680837,0.0002987592],"domain_scores_gemma":[0.99846673,0.00022418807,0.0004713963,0.00067195884,0.00011291539,0.00005280143],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017176285,0.00038340618,0.0011295243,0.0016208427,0.000016493539,0.000023575989,0.00034044648,0.00030518745,0.00043281825],"category_scores_gemma":[0.000045661025,0.00036658611,0.00026580336,0.0009427892,0.000059418468,0.00013840539,0.00003040692,0.00013319818,0.0000143286525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049015385,0.000813752,0.062354345,0.0040529016,0.041924197,0.0000036702645,0.0008893131,0.5694204,0.020729499,0.0140882945,0.28156736,0.0036660938],"study_design_scores_gemma":[0.0022592756,0.0015686532,0.08512935,0.00057484576,0.015067651,2.9879652e-7,0.000182758,0.6835986,0.14236091,0.00006489546,0.06649863,0.0026941544],"about_ca_topic_score_codex":0.0033105582,"about_ca_topic_score_gemma":0.0012045612,"teacher_disagreement_score":0.21506874,"about_ca_system_score_codex":0.00012226052,"about_ca_system_score_gemma":0.00003301966,"threshold_uncertainty_score":0.9998786},"labels":[],"label_agreement":null},{"id":"W3106066138","doi":"10.1109/tsg.2020.3037066","title":"Deep Reinforcement Learning for Demand Response in Distribution Networks","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":129,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Reinforcement learning; Computer science; Scalability; Scheduling (production processes); Load management; Electricity; Mathematical optimization; Artificial intelligence; Engineering","score_opus":0.012348596394632233,"score_gpt":0.2089434403846324,"score_spread":0.19659484399000016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106066138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016067693,0.000042883945,0.98134935,0.0003769222,0.0013053878,0.00036588486,0.0000054987554,0.00035036207,0.00013599519],"genre_scores_gemma":[0.9988577,0.000093888804,0.0002271528,0.0001711898,0.00021011359,0.00026366554,0.000049332924,0.000042469772,0.000084491294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989166,0.00005867829,0.00030598883,0.00023187195,0.00014844096,0.00033839134],"domain_scores_gemma":[0.9995255,0.00015342157,0.000025848425,0.00015598767,0.000023050108,0.00011620746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002593362,0.00019091164,0.00018165856,0.00008917276,0.00012199901,0.000033224907,0.00011049049,0.000088095534,0.000052023315],"category_scores_gemma":[0.0000150075375,0.0002180568,0.00010191139,0.00033455767,0.000018359478,0.00012597904,0.0000015797522,0.00030055904,0.00003350555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006474076,0.000018417233,0.000031767006,0.000032944896,0.000046237004,0.0000048742236,0.0001363718,0.9964561,0.00022525729,0.00001714033,0.0011742216,0.0012092498],"study_design_scores_gemma":[0.00084950106,0.00024856176,0.0005864416,0.000024548077,0.000029384575,0.000001124456,0.00005224632,0.9692173,0.0029975644,0.000003001721,0.025776677,0.00021365151],"about_ca_topic_score_codex":0.000007916899,"about_ca_topic_score_gemma":0.000027026339,"teacher_disagreement_score":0.98279,"about_ca_system_score_codex":0.000203423,"about_ca_system_score_gemma":0.000009408962,"threshold_uncertainty_score":0.8892098},"labels":[],"label_agreement":null},{"id":"W3106667537","doi":"10.1145/3427771.3429387","title":"Solar Disaggregation","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaics; Computer science; Solar power; Solar energy; Photovoltaic system; Data science; Power (physics); Engineering; Electrical engineering","score_opus":0.010286874139919848,"score_gpt":0.15823423644618717,"score_spread":0.14794736230626732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106667537","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056508016,0.00008653381,0.6170679,0.0028422696,0.0005491994,0.00009091051,7.7368173e-7,0.0021092752,0.32074514],"genre_scores_gemma":[0.99820477,0.000010616896,0.001061956,0.00041004748,0.00013464167,0.0000036121066,0.000002958295,0.00000978002,0.00016160426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999814,0.0000016829314,0.000041141167,0.000043490232,0.00004398502,0.00005573686],"domain_scores_gemma":[0.9999114,0.000003052523,0.0000021089802,0.000048755028,0.0000025473844,0.000032137737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000010471091,0.00003365519,0.000027857333,0.000007764701,0.0000074405402,0.000009470536,0.000038957663,0.000009380528,0.00022468684],"category_scores_gemma":[0.0000043779432,0.000032429005,0.000010889779,0.00006016656,0.0000024251317,0.000051012157,0.000012170286,0.000020991843,0.00031773778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013162354,0.0000035125577,0.00078139955,0.000034614335,0.000032786076,0.000003919193,0.00018961461,0.8694749,0.0018728798,0.007347738,0.10674978,0.013507546],"study_design_scores_gemma":[0.00010340203,0.000009341879,0.0017903373,0.0000020490934,0.0000046566597,1.7712917e-7,0.000033744553,0.72941625,0.010207898,0.00007292086,0.2582615,0.00009771323],"about_ca_topic_score_codex":0.0000015370877,"about_ca_topic_score_gemma":0.0000016482629,"teacher_disagreement_score":0.94169676,"about_ca_system_score_codex":0.000008561022,"about_ca_system_score_gemma":5.7086925e-7,"threshold_uncertainty_score":0.4083982},"labels":[],"label_agreement":null},{"id":"W3107377586","doi":"10.1109/ccece47787.2020.9255733","title":"Battery Storage System Optimization for Multiple Revenue Streams and Savings","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Revenue; Computer science; Profit maximization; Electricity; Software deployment; Profit (economics); Minification; Maximization; Scheduling (production processes); Demand response; Energy storage; Operations research; Arbitrage; Environmental economics; Mathematical optimization; Business; Operations management; Microeconomics; Economics; Engineering; Electrical engineering; Finance","score_opus":0.009669010136917745,"score_gpt":0.16294177207843746,"score_spread":0.15327276194151973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3107377586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048539065,0.000057094963,0.94931495,0.00022890494,0.00025093992,0.00021451392,0.00001789045,0.00040692324,0.00096973294],"genre_scores_gemma":[0.98344815,0.000009027718,0.01606814,0.000115633215,0.00016544708,0.000038004506,0.000018769813,0.000026423702,0.00011038648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966997,0.0000045376573,0.00008795186,0.00010350389,0.0000438348,0.00009018416],"domain_scores_gemma":[0.99983627,0.000025871728,0.000010306775,0.000072405135,0.000009206671,0.000045937675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003414639,0.00006904324,0.000078397585,0.000019121468,0.00002311739,0.000024000045,0.000042234784,0.000023486746,0.000013152102],"category_scores_gemma":[0.000015368598,0.000071458904,0.000015497712,0.000048677226,0.0000040870077,0.00007120663,0.000022943961,0.000023309378,0.00000497286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025607658,0.0000014533199,0.0002508813,0.0002612909,0.000016429936,0.0000012669253,0.00008033288,0.98763007,0.00019249372,0.0001200436,0.010853239,0.0005899667],"study_design_scores_gemma":[0.0002380953,0.000014024365,0.0001979866,0.000018257679,0.000010547371,5.298014e-7,0.00011445696,0.9919685,0.0004012032,7.099883e-7,0.0069552446,0.00008040976],"about_ca_topic_score_codex":0.000009524096,"about_ca_topic_score_gemma":0.0000052893206,"teacher_disagreement_score":0.9349091,"about_ca_system_score_codex":0.000032607946,"about_ca_system_score_gemma":0.0000013252918,"threshold_uncertainty_score":0.29140097},"labels":[],"label_agreement":null},{"id":"W3108203829","doi":"10.1109/epe51172.2020.9269163","title":"Intelligent Scheduling of Heat Pump to Minimize the Cost of Electricity","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Heat pump; Particle swarm optimization; Energy conservation; Computer science; Electricity; Scheduling (production processes); Metaheuristic; Energy consumption; Genetic algorithm; Mathematical optimization; Engineering; Mechanical engineering; Algorithm; Mathematics; Electrical engineering","score_opus":0.023666406982112573,"score_gpt":0.21975866924559162,"score_spread":0.19609226226347903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108203829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15001327,0.00010593188,0.8360069,0.0014089423,0.00020472059,0.00026574184,0.0000019948247,0.00013095126,0.011861549],"genre_scores_gemma":[0.99542046,0.00004342105,0.0039928434,0.0004152923,0.000060526454,0.0000126841105,9.965047e-7,0.00001436013,0.00003939944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941134,0.000011446177,0.00021725184,0.000091198046,0.00013493418,0.00013384888],"domain_scores_gemma":[0.99967736,0.00005677875,0.0000116750925,0.00016752495,0.000026779207,0.000059903112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009020616,0.000081199825,0.0001423549,0.000039430262,0.000011225784,0.0000058488954,0.00019578627,0.000020193216,0.00011717574],"category_scores_gemma":[0.000055535984,0.000060614457,0.000047304708,0.00035142293,0.000011745167,0.000022167149,0.0000700334,0.00006262376,0.000025462448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009677779,0.000009121672,0.00029215694,0.000042404725,0.000051998286,4.497689e-7,0.00019980654,0.9880766,0.00746976,0.000952116,0.0010276508,0.001868226],"study_design_scores_gemma":[0.0000937784,0.000031493328,0.0008502832,0.00001114758,0.000016118163,2.0452842e-7,0.0001860296,0.4972249,0.49500147,0.000010758119,0.006492224,0.00008161762],"about_ca_topic_score_codex":0.000050860188,"about_ca_topic_score_gemma":0.000007267891,"teacher_disagreement_score":0.8454072,"about_ca_system_score_codex":0.000026197902,"about_ca_system_score_gemma":0.0000054274315,"threshold_uncertainty_score":0.24717858},"labels":[],"label_agreement":null},{"id":"W3108231378","doi":"10.18280/jesa.530515","title":"Fuzzy Logic Controlled Based Ant-Lion Optimization Hybridization for Economic Power Dispatch","year":2020,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electric power system; Fuzzy logic; Minification; Computer science; Schedule; Mathematical optimization; Power (physics); Economic dispatch; Reliability engineering; Control theory (sociology); Engineering; Control (management); Mathematics","score_opus":0.015164975155783774,"score_gpt":0.21962351816572037,"score_spread":0.2044585430099366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108231378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023649376,0.00046324075,0.96939975,0.00072296825,0.0014050087,0.00071125483,0.000024382141,0.0007775653,0.002846462],"genre_scores_gemma":[0.9638737,0.00017826978,0.03457216,0.00042673186,0.0006128599,0.000068376976,0.000048196856,0.00013517946,0.000084560765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835104,0.00011559329,0.0007205419,0.00023601952,0.0002166341,0.00036019777],"domain_scores_gemma":[0.9991548,0.000118746226,0.00025015426,0.00017872843,0.00009103735,0.00020653447],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033001695,0.00028948276,0.00047936168,0.00018301101,0.00019289451,0.0002969599,0.00024597306,0.000072326984,0.00022578708],"category_scores_gemma":[0.0001619016,0.00026878348,0.0002105134,0.00016554777,0.000028593977,0.00040869476,0.000033978187,0.0001461456,0.00008492655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090319554,0.000017886967,0.00020718512,0.00013686935,0.00013816675,0.00001825902,0.00007944987,0.98710555,0.00030250687,0.0006233688,0.008376275,0.0029041714],"study_design_scores_gemma":[0.003538653,0.00018479324,0.00486543,0.000068800226,0.00009223199,0.000028157292,0.000026657059,0.9885354,0.00021487002,0.00032193615,0.0018337793,0.00028927223],"about_ca_topic_score_codex":0.0000029440735,"about_ca_topic_score_gemma":0.0000024984472,"teacher_disagreement_score":0.9402243,"about_ca_system_score_codex":0.0003859204,"about_ca_system_score_gemma":0.000056220346,"threshold_uncertainty_score":0.99997646},"labels":[],"label_agreement":null},{"id":"W3108765643","doi":"10.1109/jiot.2020.3042007","title":"Dynamic Energy Dispatch Based on Deep Reinforcement Learning in IoT-Driven Smart Isolated Microgrids","year":2020,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Reinforcement learning; Markov decision process; Computer science; Partially observable Markov decision process; Leverage (statistics); Smart grid; Mathematical optimization; Markov chain; Markov process; Economic dispatch; Renewable energy; Electric power system; Artificial intelligence; Power (physics); Markov model; Machine learning; Engineering; Mathematics","score_opus":0.006086732957467876,"score_gpt":0.19481799737386096,"score_spread":0.1887312644163931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108765643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36551836,0.0001273613,0.6292948,0.000739717,0.0015312049,0.00009280699,4.4992373e-7,0.00022547021,0.0024698186],"genre_scores_gemma":[0.9973683,0.00007076071,0.0014395247,0.0007751047,0.000095237716,0.0000063712046,0.00000696165,0.00006198032,0.00017577197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983707,0.000060230443,0.00063976477,0.00020420802,0.00035544878,0.00036962156],"domain_scores_gemma":[0.9994206,0.00004980677,0.00017219449,0.00014718997,0.000047148576,0.00016304788],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020533551,0.00025888326,0.00031948028,0.00029454145,0.000031580457,0.000076067234,0.00043849178,0.000097167365,0.0001555049],"category_scores_gemma":[0.00003803183,0.00026200822,0.00015321796,0.00023764567,0.000027219341,0.00015545615,0.000062778294,0.00072007836,0.000020720812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011047361,0.000028442922,0.0017548325,0.000051015202,0.00010802537,0.0000942226,0.0008323502,0.9870345,0.0063790623,0.00002185426,0.0013124131,0.0022728199],"study_design_scores_gemma":[0.00082568824,0.00038807373,0.00037416696,0.0002882573,0.000021675585,0.000014727147,0.000059957572,0.98791134,0.005395531,0.000010893673,0.004472858,0.0002368159],"about_ca_topic_score_codex":0.00013934169,"about_ca_topic_score_gemma":0.000036055215,"teacher_disagreement_score":0.63184994,"about_ca_system_score_codex":0.00030413028,"about_ca_system_score_gemma":0.000017983244,"threshold_uncertainty_score":0.9999832},"labels":[],"label_agreement":null},{"id":"W3109323998","doi":"10.1109/ccece47787.2020.9255743","title":"Optimal Demand Control of Electric Water Heaters to Accommodate the Integration of Plug-in Electric Vehicles in Residential Distribution Networks","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Thermostat; Solver; Integer programming; Transformer; Linear programming; Computer science; Mathematical optimization; Automotive engineering; Peak demand; Demand response; Electricity; Engineering; Voltage; Mathematics; Electrical engineering","score_opus":0.006690072386420381,"score_gpt":0.19244439420477566,"score_spread":0.18575432181835527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109323998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.720994,0.00006152737,0.2780099,0.00059486006,0.00004697713,0.00020435436,0.0000014232231,0.000031202955,0.000055732267],"genre_scores_gemma":[0.999702,0.00003459166,0.00006158857,0.00007895704,0.000051440005,0.000029510207,0.00002487519,0.000012329136,0.0000047190338],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999107,0.00005836147,0.00034824573,0.00012468745,0.00012223411,0.00023946865],"domain_scores_gemma":[0.99976814,0.000038290826,0.000021827722,0.00011865457,0.000020880778,0.000032228367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023462145,0.000107635926,0.00018952282,0.000115638155,0.000013042275,0.000016196096,0.00015617388,0.00004679716,0.000011970703],"category_scores_gemma":[0.000018816343,0.000073587755,0.000037043184,0.00055756315,0.000007673674,0.00009121458,0.00003238502,0.00012563133,0.0000029264882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010771078,0.000010898311,0.0015419098,0.000012737666,0.0000222269,0.0000016004717,0.00011002188,0.9432131,0.053542204,0.00020386906,0.0005311394,0.0007025549],"study_design_scores_gemma":[0.00046742108,0.00006065395,0.030060036,0.000011592689,0.000013111415,2.4997638e-7,0.000021878323,0.774156,0.19506976,0.000010855175,0.00005712474,0.00007135853],"about_ca_topic_score_codex":0.00023794321,"about_ca_topic_score_gemma":0.0001731205,"teacher_disagreement_score":0.27870795,"about_ca_system_score_codex":0.000078392644,"about_ca_system_score_gemma":0.0000048819547,"threshold_uncertainty_score":0.30008218},"labels":[],"label_agreement":null},{"id":"W3109443483","doi":"10.1049/gtd2.12026","title":"Increasing distributed generation hosting capacity in distribution systems via optimal coordination of electric vehicle aggregators","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Electric vehicle; Distributed generation; Computer science; Distribution (mathematics); Distributed computing; Engineering; Electrical engineering; Mathematics; Renewable energy","score_opus":0.024946198028666346,"score_gpt":0.20123847754754454,"score_spread":0.1762922795188782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109443483","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50038123,0.00024069926,0.49816054,0.00023668735,0.00024644216,0.00031295326,0.00022386631,0.00018777145,0.0000098378905],"genre_scores_gemma":[0.98481673,0.00010280676,0.00046827525,0.000018936604,0.00045524948,0.00007765726,0.014018659,0.00003912406,0.0000025892618],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973193,0.00029116165,0.0009797793,0.00045938307,0.0005272953,0.0004230815],"domain_scores_gemma":[0.99907106,0.000049973645,0.00021757878,0.00021184566,0.00023587835,0.00021366685],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005892864,0.00034809133,0.0003886816,0.00011504908,0.000198881,0.00010612708,0.00016533791,0.00024920222,0.000019773459],"category_scores_gemma":[0.00015941297,0.0003923531,0.00011197547,0.0013507765,0.00003481178,0.00055794866,0.000021076103,0.0002789071,0.000007755393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003144621,0.00004901543,0.00086471095,0.000100079415,0.000022972894,0.0000024386288,0.00008667924,0.5753731,0.41801798,0.00039513802,0.0013741112,0.0036823242],"study_design_scores_gemma":[0.0007230109,0.00007959741,0.0037820423,0.00005880819,0.00004378815,0.000005215708,0.000030787844,0.79148287,0.20179552,0.000007704436,0.0016974728,0.0002931912],"about_ca_topic_score_codex":0.00020362828,"about_ca_topic_score_gemma":0.000012552979,"teacher_disagreement_score":0.49769226,"about_ca_system_score_codex":0.000675331,"about_ca_system_score_gemma":0.000048985647,"threshold_uncertainty_score":0.99985284},"labels":[],"label_agreement":null},{"id":"W3109986448","doi":"10.1109/ccece47787.2020.9255750","title":"Demand Charges Minimization for Ontario Class-A Customers Based on the Optimization of Energy Storage System","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Minification; Sizing; Electricity; Software deployment; Computer science; Energy storage; Energy minimization; Scheduling (production processes); Electricity market; Peak demand; Mathematical optimization; Load shifting; Demand response; Operations research; Electrical engineering; Engineering; Power (physics); Mathematics","score_opus":0.012505845224586927,"score_gpt":0.1727509299698421,"score_spread":0.16024508474525517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109986448","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021499787,0.000012725568,0.97855574,0.0005204568,0.00029102282,0.00021985908,0.000005326454,0.00022668942,0.018018223],"genre_scores_gemma":[0.99571073,0.0000046185596,0.0033796276,0.0003832726,0.00007758704,0.00007964521,0.00005157258,0.000031975265,0.0002809492],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941367,0.000020188216,0.00018296362,0.0001269737,0.00013953127,0.00011667969],"domain_scores_gemma":[0.99965775,0.00007411518,0.000040799037,0.00015058632,0.000036405214,0.00004034286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007669953,0.000113144786,0.00012797311,0.000058746067,0.000037410962,0.000016971071,0.000108571665,0.00004313237,0.00010233404],"category_scores_gemma":[0.00001529246,0.000087577464,0.000049630027,0.00014913578,0.000009671772,0.00005222489,0.000011698708,0.00003353524,0.0000025910435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018982764,0.0000071867203,0.000059658374,0.00010016587,0.000035010653,3.3471872e-7,0.00009496168,0.9827703,0.000055679226,0.009634049,0.0071817096,0.000041937627],"study_design_scores_gemma":[0.00028916023,0.000047389483,0.00006631668,0.000021090254,0.000025729569,6.461103e-8,0.0001006308,0.9798669,0.0025834083,7.4244156e-7,0.016906423,0.000092101276],"about_ca_topic_score_codex":0.00015593678,"about_ca_topic_score_gemma":0.00035252637,"teacher_disagreement_score":0.9935608,"about_ca_system_score_codex":0.00015370539,"about_ca_system_score_gemma":0.000016396332,"threshold_uncertainty_score":0.35713053},"labels":[],"label_agreement":null},{"id":"W3110236022","doi":"10.1016/j.tej.2020.106878","title":"High electrification futures: Impacts to the U.S. bulk power system","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Pacific Northwest National Laboratory; Office of Energy Efficiency; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; Environmental Defense Fund; Natural Resources Canada","keywords":"Electrification; Futures contract; Environmental economics; Natural resource economics; Electricity; Rural electrification; Business; Economics; Engineering; Electrical engineering; Finance","score_opus":0.006635990697534596,"score_gpt":0.1794587249971947,"score_spread":0.1728227342996601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110236022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69705635,0.0038892846,0.22921179,0.057073433,0.0035966174,0.0010483541,0.0000066459047,0.0012126372,0.0069048665],"genre_scores_gemma":[0.9963473,0.00015538579,0.00009746099,0.0015151744,0.0017924099,0.000013307697,0.0000013121538,0.000037229765,0.000040384966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865305,0.000103367594,0.0002812367,0.00012669548,0.00039412818,0.0004415374],"domain_scores_gemma":[0.9993276,0.000063554806,0.00006928066,0.00028248507,0.00006508722,0.00019198415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005665313,0.00017426549,0.00015845582,0.00008829718,0.00038325705,0.0001914357,0.00066500093,0.00004661527,0.00003859725],"category_scores_gemma":[0.00008841282,0.00009963124,0.00008268407,0.000918719,0.00000932289,0.000094164476,0.000024053421,0.0005933474,0.0002197771],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007785448,0.000017028126,0.000041981173,0.000032691794,0.0002950686,0.000021884958,0.001596914,0.71205693,0.019217772,0.008070293,0.25388518,0.0046863793],"study_design_scores_gemma":[0.0021462047,0.0013627555,0.030369034,0.00015718707,0.00049321423,0.001178097,0.0017403896,0.24893136,0.15252873,0.00054619287,0.55882764,0.0017191893],"about_ca_topic_score_codex":0.000019648198,"about_ca_topic_score_gemma":0.000008885145,"teacher_disagreement_score":0.4631256,"about_ca_system_score_codex":0.00029582944,"about_ca_system_score_gemma":0.000039969233,"threshold_uncertainty_score":0.4062844},"labels":[],"label_agreement":null},{"id":"W3112335786","doi":"10.1016/j.ijepes.2020.106646","title":"Optimal bidding strategy of a virtual power plant in day-ahead energy and frequency regulation markets: A deep learning-based approach","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":159,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Virtual power plant; Bidding; Exploit; Demand response; Profit (economics); Diversification (marketing strategy); Electricity market; Computer science; Renewable energy; Electricity; Distributed generation; Engineering; Reliability engineering; Operations research; Electrical engineering; Economics; Business; Computer security; Microeconomics","score_opus":0.007882975602796055,"score_gpt":0.1955890147772782,"score_spread":0.18770603917448214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112335786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20799658,0.004006725,0.7788,0.00022719003,0.0015645815,0.0001090197,0.000012621255,0.00010552463,0.00717775],"genre_scores_gemma":[0.9991052,0.00009313937,0.00036489367,0.000059076512,0.00027308724,0.0000090066505,0.000021989135,0.000039846083,0.000033771943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976547,0.00018808914,0.0009383976,0.00022106645,0.00073109055,0.000266706],"domain_scores_gemma":[0.99904215,0.00017515209,0.00032781364,0.00009287838,0.0002024733,0.00015955714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038387722,0.0002304618,0.00041487362,0.0005795172,0.000021540085,0.00007712799,0.00036063374,0.0001308459,0.000034466684],"category_scores_gemma":[0.00012271752,0.00022051408,0.000112547445,0.00039906285,0.00003408253,0.00025057525,0.000039833107,0.00027038006,5.693226e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018452064,0.00007688453,0.0005559906,0.000012249419,0.00027182436,0.00010300952,0.00013259934,0.9793783,0.003125195,0.014629956,0.00041084166,0.0011186264],"study_design_scores_gemma":[0.0011852253,0.0004719742,0.0025018074,0.00011427582,0.00002232666,0.00009777312,0.0001189315,0.98912644,0.00087593583,0.000049360446,0.005191184,0.00024475844],"about_ca_topic_score_codex":0.000107056636,"about_ca_topic_score_gemma":0.000010649721,"teacher_disagreement_score":0.7911086,"about_ca_system_score_codex":0.00026277467,"about_ca_system_score_gemma":0.00005483173,"threshold_uncertainty_score":0.8992303},"labels":[],"label_agreement":null},{"id":"W3113557157","doi":"10.18280/mmep.070408","title":"Feasibility Study of Grid-Connected PV System for Peak Demand Reduction of a Residential Building in Tehran, Iran","year":2020,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fossil fuel; Renewable energy; Grid; Photovoltaic system; Environmental economics; Automotive engineering; Capital cost; Battery (electricity); Environmental science; Energy storage; Computer science; Reliability engineering; Engineering; Electrical engineering; Economics; Power (physics); Waste management","score_opus":0.042763913163631276,"score_gpt":0.2256273021917727,"score_spread":0.18286338902814142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113557157","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5321907,0.000067827525,0.46706682,0.000008649983,0.00008137206,0.00043912526,0.0000019739202,0.00012496379,0.00001858135],"genre_scores_gemma":[0.9867075,0.000008305303,0.013084722,4.5096232e-7,0.00007026716,0.00008558062,0.0000019463769,0.000039688624,0.0000015462804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987686,0.000017172733,0.0006188025,0.00023133599,0.00016002875,0.00020402641],"domain_scores_gemma":[0.9995927,0.00008458404,0.000051212766,0.0001690619,0.000032441098,0.00007000219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038425118,0.00017099763,0.00042780433,0.00012375414,0.000020821299,0.000017037188,0.00010094081,0.00006326576,0.000001262445],"category_scores_gemma":[0.000050023154,0.00017330339,0.00004967975,0.00023082618,0.0000135187665,0.00007476794,0.000035178313,0.000112322545,2.993409e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024702103,0.00007841027,0.000058740403,0.007215085,0.000057265846,8.773365e-7,0.002297671,0.9817665,0.0071875216,0.001289943,0.000004931774,0.000018349663],"study_design_scores_gemma":[0.00088348106,0.00012362181,0.000086246284,0.00047582173,0.00005656268,0.0000026322086,0.00047798973,0.99498916,0.0023757026,0.00037642987,0.000003427295,0.0001489413],"about_ca_topic_score_codex":0.000021376934,"about_ca_topic_score_gemma":0.00000174001,"teacher_disagreement_score":0.4545168,"about_ca_system_score_codex":0.000042817876,"about_ca_system_score_gemma":0.0000033141464,"threshold_uncertainty_score":0.7067107},"labels":[],"label_agreement":null},{"id":"W3113787841","doi":"10.1016/j.tej.2020.106903","title":"Going viral: The impacts of covid19 on retail electricity","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Remuneration; Electricity; Business; Business model; Key (lock); Coronavirus disease 2019 (COVID-19); Mains electricity; Grid; Industrial organization; Environmental economics; Commerce; Economics; Marketing; Finance; Engineering; Computer science; Computer security; Medicine","score_opus":0.014930916475880917,"score_gpt":0.20505439925811406,"score_spread":0.19012348278223315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113787841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9641712,0.0015087087,0.018728577,0.0065532303,0.00044582476,0.0002801829,0.000003177933,0.0002565677,0.008052547],"genre_scores_gemma":[0.99701786,0.0007027225,0.000049495862,0.0015058515,0.0006382406,0.0000034258642,7.6706385e-7,0.0000378614,0.000043796215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998371,0.00016295425,0.0003723634,0.00012395225,0.0004916718,0.0004780488],"domain_scores_gemma":[0.99913585,0.00026584056,0.00014185185,0.0002711481,0.00005498913,0.00013032983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075900205,0.00020176754,0.00023800976,0.0000996599,0.0002533175,0.00008431358,0.00069004716,0.00005276393,0.000060224163],"category_scores_gemma":[0.0002845543,0.000117601274,0.00015022107,0.00086412445,0.00003864856,0.00011485898,0.00005185435,0.0009809644,0.000049686838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037679673,0.00009812702,0.0018860039,0.00009858864,0.0008830011,0.00006176629,0.0014509711,0.7724646,0.06821132,0.005898836,0.12954,0.019030048],"study_design_scores_gemma":[0.0019935118,0.0016987828,0.017412493,0.000103886116,0.0003621296,0.00027006396,0.00010878387,0.63249516,0.26315856,0.0020894709,0.07944274,0.0008644103],"about_ca_topic_score_codex":0.0000148380705,"about_ca_topic_score_gemma":0.0000050865533,"teacher_disagreement_score":0.19494724,"about_ca_system_score_codex":0.00017440578,"about_ca_system_score_gemma":0.000046370114,"threshold_uncertainty_score":0.47956407},"labels":[],"label_agreement":null},{"id":"W3113846595","doi":"10.1109/pesgm41954.2020.9281703","title":"Deep Reinforcement Learning for Direct Load Control in Distribution Networks","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"News aggregator; Reinforcement learning; Markov decision process; Computer science; Control (management); Markov process; Artificial neural network; Mathematical optimization; Demand response; Markov chain; Operations research; Artificial intelligence; Engineering; Electricity; Machine learning","score_opus":0.006725091412160987,"score_gpt":0.18288117594952855,"score_spread":0.17615608453736756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113846595","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00068134366,0.000115807336,0.98785114,0.00024032338,0.00018836765,0.00024932262,3.742844e-7,0.00032709708,0.010346198],"genre_scores_gemma":[0.9990868,0.00003478257,0.00012907643,0.00025735228,0.00017185122,0.00010419885,0.00006268627,0.000017218412,0.0001360071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938214,0.000010058972,0.00017123007,0.00011797208,0.000090469875,0.00022813432],"domain_scores_gemma":[0.99980193,0.00004546132,0.000013802136,0.00006761158,0.000016374905,0.000054793643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000111971596,0.00009782703,0.00012617948,0.000014378705,0.00002512591,0.000020443946,0.000065616114,0.00003647268,0.00005461308],"category_scores_gemma":[0.00004769921,0.000100108766,0.000040220635,0.00012345782,0.000005025459,0.00006067282,0.000019485153,0.000086690845,0.000013494238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019691943,0.0000024342946,0.0005571172,0.000020815885,0.000027498578,0.0000013492345,0.000033596378,0.99292576,0.000031836553,0.0006359923,0.004187965,0.0015559341],"study_design_scores_gemma":[0.00077575387,0.000039568262,0.0005850936,0.0000062028935,0.000010003736,7.0865525e-8,0.00002306607,0.9331178,0.00010184415,0.0000037680466,0.06522806,0.00010877813],"about_ca_topic_score_codex":0.000017113165,"about_ca_topic_score_gemma":0.000033894998,"teacher_disagreement_score":0.99840546,"about_ca_system_score_codex":0.00016513077,"about_ca_system_score_gemma":0.0000035205815,"threshold_uncertainty_score":0.4082317},"labels":[],"label_agreement":null},{"id":"W3113970002","doi":"10.3390/app11010180","title":"Incentive Price-Based Demand Response in Active Distribution Grids","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Toronto; Energinet.dk","keywords":"Demand response; Smart grid; Computer science; Incentive; Grid; Distributed generation; Voltage; Peak demand; Context (archaeology); Reliability engineering; Electrical engineering; Automotive engineering; Electricity; Engineering; Renewable energy; Economics; Microeconomics","score_opus":0.01339789565888278,"score_gpt":0.2090334577807949,"score_spread":0.19563556212191213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113970002","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9388083,0.000025635502,0.053268436,0.00066406897,0.00014024081,0.00019027933,0.000009833007,0.00017850146,0.0067146523],"genre_scores_gemma":[0.9993745,0.000004168039,0.00034035236,0.00017795053,0.000041122996,0.000044111435,0.000008867849,0.00000582273,0.0000030770889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992077,0.000027385886,0.00011842025,0.00021708706,0.00021048376,0.00021895427],"domain_scores_gemma":[0.99974006,0.00009798367,0.000019934507,0.00007406958,0.000008047929,0.00005992528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003287017,0.00009389991,0.00009407899,0.000055934397,0.000071524,0.000036548587,0.0002005071,0.00002895499,0.000020157342],"category_scores_gemma":[0.000039583934,0.000089073175,0.000016701484,0.0008204691,0.000112465714,0.00010238572,0.000042698182,0.00008138191,0.000035920737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021852706,0.000016686601,0.00076389045,0.000015117253,0.00000810375,0.0000055813566,0.00046097624,0.98447853,0.009090582,0.0032283177,0.0008818254,0.00083187176],"study_design_scores_gemma":[0.0012440663,0.00020077956,0.17089298,0.00003085471,0.000014193763,3.0825657e-7,0.0013074421,0.6698947,0.13854016,0.0005112274,0.016812949,0.0005503182],"about_ca_topic_score_codex":0.0000047398785,"about_ca_topic_score_gemma":0.0000055109867,"teacher_disagreement_score":0.3145838,"about_ca_system_score_codex":0.00011069225,"about_ca_system_score_gemma":0.000029068642,"threshold_uncertainty_score":0.36322987},"labels":[],"label_agreement":null},{"id":"W3114687565","doi":"10.1109/tsg.2020.3048397","title":"A New Method for Peer Matching and Negotiation of Prosumers in Peer-to-Peer Energy Markets","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":128,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Scalability; Negotiation; Computer science; Peer-to-peer; Matching (statistics); Database transaction; Distributed computing; Process (computing); Transaction cost; Grid; Microeconomics; Economics","score_opus":0.014272582664718697,"score_gpt":0.2472437944312475,"score_spread":0.2329712117665288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114687565","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010126914,0.000021362892,0.98245734,0.005084658,0.0012502173,0.00032538836,0.000044623317,0.00016058331,0.00052893255],"genre_scores_gemma":[0.8837794,0.0000322649,0.11261642,0.00068705395,0.00031155406,0.00024197627,0.000023794215,0.00011086009,0.002196676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864906,0.00004098977,0.00033836853,0.0002979904,0.00041333388,0.0002602283],"domain_scores_gemma":[0.99938613,0.00012828164,0.000034263732,0.00017906548,0.00009924736,0.00017303055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034307054,0.00021007992,0.00026588325,0.00025529644,0.000048115122,0.00003344395,0.00012160474,0.00008419802,0.000054217642],"category_scores_gemma":[0.000022699174,0.00023563707,0.00008991283,0.0003964306,0.0000094047155,0.00017021096,0.000002875914,0.00014957889,0.000006503604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015013797,0.000031051874,0.000034620876,0.00012715594,0.00010964921,0.000002171046,0.0013545842,0.94436526,0.004418842,0.0001717701,0.014251023,0.03498373],"study_design_scores_gemma":[0.0034558384,0.00037858466,0.0034059929,0.00014451663,0.00022783544,0.00000810308,0.00059678266,0.5509789,0.13229014,0.00034113758,0.30720657,0.0009656047],"about_ca_topic_score_codex":0.0003449677,"about_ca_topic_score_gemma":0.00038531495,"teacher_disagreement_score":0.87365246,"about_ca_system_score_codex":0.000079995065,"about_ca_system_score_gemma":0.000023068005,"threshold_uncertainty_score":0.96090007},"labels":[],"label_agreement":null},{"id":"W3115245816","doi":"10.1109/pesgm41954.2020.9281946","title":"Deep Reinforcement Learning For Peak Load Reduction In Aggregated Residential Houses","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Unavailability; Reinforcement learning; Demand response; Computer science; Energy consumption; Peak demand; Flexibility (engineering); Electricity; Scheduling (production processes); Incentive; Reduction (mathematics); Load management; Cluster (spacecraft); Mathematical optimization; Operations research; Artificial intelligence; Reliability engineering; Engineering; Computer network; Electrical engineering; Economics; Mathematics; Statistics","score_opus":0.013961104200238692,"score_gpt":0.20783903191419079,"score_spread":0.1938779277139521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115245816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16782267,0.00034532102,0.80131674,0.0012101526,0.0015613714,0.00089186674,2.539872e-7,0.0023611493,0.024490472],"genre_scores_gemma":[0.99790406,0.00008210328,0.0008513876,0.000060029095,0.00028350702,0.000061366016,0.000014334693,0.000035947163,0.0007072874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992461,0.000011483774,0.00021846486,0.00016058383,0.00015185268,0.00021146676],"domain_scores_gemma":[0.9997931,0.000013128763,0.000022655195,0.00009261028,0.000025336994,0.000053166714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008766988,0.00011082878,0.00011084788,0.00007022673,0.00003459742,0.00003381431,0.00008780281,0.000039789415,0.00012652061],"category_scores_gemma":[0.000062270425,0.000121570985,0.000039612394,0.00020120479,0.000008630623,0.0001356975,0.000039511422,0.000097048665,0.00004246082],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028729142,0.0000033189651,0.00005200821,0.0000546216,0.000028213704,0.0000034438215,0.00036113357,0.99030465,0.002465101,0.00026848985,0.0052774344,0.0011528351],"study_design_scores_gemma":[0.00067286345,0.00006964809,0.00034674988,0.000017126742,0.000014316498,0.0000012810888,0.00028074268,0.9680839,0.0132811535,0.000021468233,0.017036555,0.00017415162],"about_ca_topic_score_codex":0.00007663408,"about_ca_topic_score_gemma":0.00007986083,"teacher_disagreement_score":0.83008134,"about_ca_system_score_codex":0.00014580904,"about_ca_system_score_gemma":0.000009301219,"threshold_uncertainty_score":0.4957521},"labels":[],"label_agreement":null},{"id":"W3115779604","doi":"10.1109/pesgm41954.2020.9282108","title":"Regression-Based Wintertime Energy Consumption Prediction for Cold Load Pick-Up Management","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Smart meter; Benchmark (surveying); Linear regression; Computer science; Regression; Energy consumption; Regression analysis; Smart grid; Environmental science; Statistics; Engineering; Mathematics; Machine learning","score_opus":0.01750847537752744,"score_gpt":0.20358296945316684,"score_spread":0.1860744940756394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115779604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004191197,0.00012562258,0.97673094,0.0008235271,0.0015532132,0.00040566982,0.000018744278,0.0015761281,0.014574976],"genre_scores_gemma":[0.9899049,0.00007961216,0.004587008,0.001475781,0.00029561148,0.0003654493,0.00007754265,0.000062362196,0.0031517777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905175,0.000012280233,0.00023546042,0.00025460517,0.0002202466,0.00022568731],"domain_scores_gemma":[0.9995869,0.000031333027,0.000026069902,0.00021200505,0.00003370708,0.00011000814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006954889,0.00017689982,0.00013739725,0.00006545632,0.00004896458,0.0000343835,0.00013742938,0.00005725795,0.00037266375],"category_scores_gemma":[0.000007820274,0.00016769458,0.000075556745,0.00010915877,0.000015983145,0.00009278594,0.000043888544,0.00004752069,0.000075908814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010259956,0.000036242585,0.00042842745,0.00050091516,0.0002428153,0.000008652428,0.00006104359,0.58027136,0.0044345013,0.008875483,0.3987061,0.0063318247],"study_design_scores_gemma":[0.0010489933,0.00006240174,0.00040656378,0.000054253396,0.000051909614,2.2620291e-7,0.000021884201,0.7147514,0.02117614,0.000021696693,0.26223636,0.00016814288],"about_ca_topic_score_codex":0.00000839997,"about_ca_topic_score_gemma":0.000009462736,"teacher_disagreement_score":0.98571366,"about_ca_system_score_codex":0.00017229593,"about_ca_system_score_gemma":0.000007012331,"threshold_uncertainty_score":0.68383867},"labels":[],"label_agreement":null},{"id":"W3115997979","doi":"10.1109/smartgridcomm47815.2020.9302992","title":"Decentralized Microgrid Energy Management: A Multi-agent Correlated Q-learning Approach","year":2020,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Canada Research Chairs","keywords":"Microgrid; Nash equilibrium; Convergence (economics); Smart grid; Energy management system; Computer science; Energy management; Revenue; Correlated equilibrium; Renewable energy; Mathematical optimization; Competition (biology); Multi-agent system; Operations research; Game theory; Energy (signal processing); Microeconomics; Control (management); Economics; Equilibrium selection; Artificial intelligence; Mathematics; Engineering; Repeated game","score_opus":0.018208962483692463,"score_gpt":0.20441234099728076,"score_spread":0.18620337851358829,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115997979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001890952,0.002986615,0.9060952,0.00011711183,0.0039028663,0.0007923788,0.000014110628,0.0057220734,0.07847868],"genre_scores_gemma":[0.67514944,0.026568828,0.27370846,0.0010373307,0.0008418587,0.0016889506,0.0039086286,0.001172735,0.015923774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99691075,0.00011024321,0.0007065415,0.00102581,0.0004347673,0.00081187085],"domain_scores_gemma":[0.9987243,0.000021903461,0.000121723264,0.0007757777,0.00004166814,0.00031463022],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015325208,0.0008552323,0.00070964743,0.0003300347,0.000095498304,0.000221275,0.00085381704,0.00042642435,0.0003337922],"category_scores_gemma":[0.000011251396,0.0009329945,0.00035539267,0.0004070314,0.00004103444,0.0000689356,0.001798435,0.0010511309,0.00021787977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001762163,0.00009497859,0.000110228226,0.0007819971,0.0016499644,0.00011928955,0.0001775148,0.9694808,0.00012148647,0.0025012738,0.019283943,0.005660901],"study_design_scores_gemma":[0.0010058027,0.000010836855,0.0003082591,0.0000912471,0.00025084775,0.000004272694,0.000091265465,0.73422843,0.00037886392,0.00005035368,0.26277438,0.00080548006],"about_ca_topic_score_codex":0.00013234382,"about_ca_topic_score_gemma":0.0000120948525,"teacher_disagreement_score":0.6732585,"about_ca_system_score_codex":0.00036848505,"about_ca_system_score_gemma":0.000015665302,"threshold_uncertainty_score":0.99931204},"labels":[],"label_agreement":null},{"id":"W3116021410","doi":"10.1109/uemcon51285.2020.9298157","title":"Energy Disaggregation using Multilabel Binarization and Gaussian Naive Bayes Classifier","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Computer science; Naive Bayes classifier; Jaccard index; Gaussian process; Artificial intelligence; Classifier (UML); Machine learning; Gaussian; Bayesian probability; Test data; Energy (signal processing); Data mining; Pattern recognition (psychology); Statistics; Mathematics; Support vector machine","score_opus":0.01999092354797935,"score_gpt":0.19908172045573228,"score_spread":0.17909079690775292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116021410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14185642,0.00016821107,0.84521705,0.000694191,0.00036539917,0.00009095391,0.0000023005205,0.00059383287,0.011011621],"genre_scores_gemma":[0.9963951,0.00006467972,0.0029909234,0.0002578364,0.00013779667,0.0000058836727,0.000012651644,0.000027667556,0.00010747718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950266,0.000011075655,0.000119782475,0.00015121215,0.00009166986,0.00012362286],"domain_scores_gemma":[0.9998059,0.000009344698,0.000016819742,0.00007979972,0.000012641469,0.000075437376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000021277217,0.00010728003,0.00008352416,0.000049003218,0.000044352368,0.00004339614,0.00004493263,0.000044185395,0.000047910577],"category_scores_gemma":[0.0000094578745,0.00010501545,0.000015288593,0.00017224092,0.000016739128,0.00019338002,0.000038559756,0.000036971196,0.0000061333462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000159363,0.000025797508,0.005008179,0.00015810132,0.00014940967,0.000013167192,0.0012535371,0.8785474,0.044490863,0.0409672,0.0021635706,0.027206877],"study_design_scores_gemma":[0.00019841034,0.000013124698,0.0013663254,0.000014353776,0.00001510302,7.76983e-7,0.00008287311,0.9862543,0.0047455523,0.00006424704,0.007108324,0.00013664157],"about_ca_topic_score_codex":0.000040814313,"about_ca_topic_score_gemma":0.000018232644,"teacher_disagreement_score":0.8545387,"about_ca_system_score_codex":0.000037074078,"about_ca_system_score_gemma":0.000003479034,"threshold_uncertainty_score":0.42824057},"labels":[],"label_agreement":null},{"id":"W3116851389","doi":"10.3390/s21010130","title":"Demand Management for Optimized Energy Usage and Consumer Comfort Using Sequential Optimization","year":2020,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Thermal comfort; HVAC; Computer science; Demand response; Energy consumption; Scheduling (production processes); Linear programming; Efficient energy use; Air conditioning; Energy management; Mathematical optimization; Reliability engineering; Engineering; Energy (signal processing); Electricity; Operations management; Algorithm","score_opus":0.021128531340889115,"score_gpt":0.2179576694929108,"score_spread":0.1968291381520217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116851389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078261174,0.00015347377,0.917694,0.00010415163,0.00036642692,0.00029349714,0.000009236571,0.00029307202,0.0028249747],"genre_scores_gemma":[0.7466655,0.0005976042,0.25141984,0.0005016174,0.00027474744,0.0000537741,0.00007591576,0.00011939734,0.00029163266],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992472,0.000018960898,0.00019210132,0.00021499452,0.00010883383,0.00021791844],"domain_scores_gemma":[0.9997182,0.000022846929,0.000027595977,0.00011973623,0.000016156848,0.00009546636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006906269,0.00015911488,0.00017204211,0.00006773722,0.00006829212,0.0000592786,0.00006737642,0.00004729191,0.0000369719],"category_scores_gemma":[0.0000063550765,0.00017603974,0.000044731016,0.00011339025,0.000029186062,0.00009137182,0.00005883304,0.00003686489,0.0000016926111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020509107,0.0000043035293,0.00004359856,0.00009357542,0.00015959836,0.000010888361,0.000058822076,0.997556,0.00017083464,0.00061825785,0.00077411794,0.0004895515],"study_design_scores_gemma":[0.0010018323,0.000012596036,0.000021830852,0.0000125516235,0.00011143224,0.0000026797397,0.00007325162,0.98361164,0.0011504572,0.000015422349,0.013791603,0.00019467378],"about_ca_topic_score_codex":0.000010453159,"about_ca_topic_score_gemma":0.0000016691058,"teacher_disagreement_score":0.6684043,"about_ca_system_score_codex":0.000039489947,"about_ca_system_score_gemma":0.0000028130441,"threshold_uncertainty_score":0.7178693},"labels":[],"label_agreement":null},{"id":"W3117044811","doi":"10.1109/pesgm41954.2020.9281577","title":"Optimal Configuration of Energy Storage System Considering Uncertainty of Load and Wind Generation","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Natural Science Foundation of China","keywords":"Wind power; Computer science; Particle swarm optimization; Mathematical optimization; Electric power system; Energy storage; Simulated annealing; Power (physics); Engineering; Algorithm","score_opus":0.01665053913672874,"score_gpt":0.18775632546945817,"score_spread":0.17110578633272944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117044811","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66196597,0.00018363466,0.33051878,0.00005862113,0.00017513601,0.000072059265,0.0000038901667,0.00013141872,0.006890458],"genre_scores_gemma":[0.9985245,0.000017760112,0.0013004789,0.000024422972,0.000085350235,0.0000031255786,0.000009407073,0.000011381586,0.000023615336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994621,0.000014648676,0.00022493683,0.00010099515,0.00012407846,0.00007318388],"domain_scores_gemma":[0.9997725,0.000016060349,0.000038675258,0.000085781845,0.000046962854,0.000040021434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059298065,0.000081847786,0.00014965016,0.00003053986,0.00001306735,0.000009908974,0.00003570481,0.000033399974,0.00002878184],"category_scores_gemma":[0.0000107466,0.000083561245,0.000018848554,0.000072535295,0.000024777857,0.000075976415,0.000020421405,0.00002457938,9.084246e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045068346,0.0000022031832,0.00003529437,0.00015499968,0.000039110306,0.0000017567894,0.00015203944,0.91059434,0.0782266,0.010040414,0.00048774076,0.00026101538],"study_design_scores_gemma":[0.00021557637,0.00003106377,0.00010561912,0.000015502199,0.000014898376,0.0000011701446,0.00023791999,0.85237896,0.1459379,9.979245e-7,0.0009878338,0.00007258051],"about_ca_topic_score_codex":0.00007616739,"about_ca_topic_score_gemma":0.000021436192,"teacher_disagreement_score":0.33655846,"about_ca_system_score_codex":0.000046898414,"about_ca_system_score_gemma":0.000011871986,"threshold_uncertainty_score":0.34075287},"labels":[],"label_agreement":null},{"id":"W3117335792","doi":"10.1109/pesgm41954.2020.9281513","title":"State Space Model of Aggregated TCLs for Frequency Regulation with a Low Communication Requirement","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Control theory (sociology); Control (management); Computer science; Population; Automatic frequency control; State (computer science); Space (punctuation); State space; SIGNAL (programming language); Mathematics; Telecommunications; Algorithm","score_opus":0.020783535282066595,"score_gpt":0.20478106774387206,"score_spread":0.18399753246180547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117335792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09979482,0.00006366878,0.89305973,0.0010268274,0.000024272846,0.0004365553,0.000008280714,0.00029831467,0.005287522],"genre_scores_gemma":[0.9162643,0.000045109413,0.083340704,0.00006554029,0.00001068831,0.00005658988,0.000042986074,0.000027308579,0.00014676993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994544,0.000008108462,0.00019000452,0.00010564973,0.00012585208,0.00011600347],"domain_scores_gemma":[0.9995389,0.000015903039,0.00005084063,0.00028471774,0.00006756964,0.000042040912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000074178395,0.00009503609,0.00011348726,0.00003607204,0.000021902679,0.000010940301,0.000121811216,0.000021236121,0.000015433587],"category_scores_gemma":[0.000009419857,0.000087001405,0.000022941775,0.00014298873,0.00001706455,0.00014196566,0.000025899173,0.000034046174,0.000003096361],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021495223,0.000009584099,0.000058921705,0.00011704584,0.000050290637,1.0729374e-7,0.00029433946,0.9804465,0.011052507,0.0061045205,0.0013619558,0.00048269218],"study_design_scores_gemma":[0.00044809328,0.000057233618,0.00018531465,0.00004263729,0.000017339285,7.5139354e-8,0.00003292178,0.9611767,0.036745936,0.0010023325,0.00018660401,0.00010480989],"about_ca_topic_score_codex":0.00002763494,"about_ca_topic_score_gemma":0.00004104305,"teacher_disagreement_score":0.8164695,"about_ca_system_score_codex":0.000055881348,"about_ca_system_score_gemma":0.000010241964,"threshold_uncertainty_score":0.35478145},"labels":[],"label_agreement":null},{"id":"W3117564018","doi":"10.1109/pesgm41954.2020.9281394","title":"Flexibility of Residential Loads for Demand Response Provisions in Smart Grid","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flexibility (engineering); Smart grid; Demand response; Grid; Computer science; Energy consumption; Scheme (mathematics); Energy management system; Peak demand; Consumption (sociology); Energy management; Load management; Environmental economics; Energy (signal processing); Engineering; Electricity; Electrical engineering","score_opus":0.02352652507405171,"score_gpt":0.24506827460532693,"score_spread":0.22154174953127523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117564018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9178583,0.00005510028,0.077442355,0.0012322817,0.00041348158,0.0005092045,0.000015568468,0.00023634173,0.0022373656],"genre_scores_gemma":[0.9966981,0.000005916151,0.002876702,0.00008662095,0.00009530937,0.00004785624,0.0000062795025,0.0000187342,0.00016448367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923044,0.000039805145,0.00028215122,0.00017222972,0.00011184039,0.00016350107],"domain_scores_gemma":[0.9995575,0.00013455916,0.000016210834,0.00020724663,0.000021928172,0.000062566745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038380438,0.00009128666,0.00015472801,0.000075136224,0.000015295653,0.000010174804,0.000128819,0.000041178406,0.000084793326],"category_scores_gemma":[0.0002419956,0.00008997371,0.000055221615,0.00019840113,0.000019691386,0.00007886057,0.00006463215,0.00005852678,0.000010712539],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012485585,0.00005187685,0.0035565742,0.000331888,0.00005303719,0.000007726004,0.00042812084,0.92627263,0.019340504,0.0010406538,0.04720844,0.00045996343],"study_design_scores_gemma":[0.002519248,0.00038721098,0.11466234,0.000051825704,0.000041632364,8.4436425e-7,0.0002184683,0.7103823,0.111846365,0.00051622087,0.058939584,0.00043394708],"about_ca_topic_score_codex":0.000038857317,"about_ca_topic_score_gemma":0.00014144037,"teacher_disagreement_score":0.21589035,"about_ca_system_score_codex":0.000038747523,"about_ca_system_score_gemma":0.000017349588,"threshold_uncertainty_score":0.36690217},"labels":[],"label_agreement":null},{"id":"W3118439948","doi":"10.1007/s12273-020-0751-x","title":"Evaluating the impact of thermostat control strategies on the energy flexibility of residential buildings for space heating","year":2021,"lang":"en","type":"article","venue":"Building Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Thermostat; Flexibility (engineering); Demand response; Smart grid; Model predictive control; Thermal comfort; Context (archaeology); Efficient energy use; Control (management); Grid; Architectural engineering; Engineering; Automotive engineering; Building management system; Computer science; Simulation; Electricity; Mechanical engineering; Electrical engineering","score_opus":0.0480055152506412,"score_gpt":0.35910302719567255,"score_spread":0.3110975119450313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118439948","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78986955,0.00010301169,0.2092842,0.00007339234,0.00013883888,0.00021453302,0.000008550638,0.000051006667,0.00025693182],"genre_scores_gemma":[0.9982109,0.000003884053,0.0015485068,0.000015741936,0.00014051562,0.000029600526,0.0000062931276,0.000029456814,0.000015080251],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988283,0.00014220491,0.00037073856,0.00017940847,0.00028329217,0.00019607479],"domain_scores_gemma":[0.9973221,0.0019223113,0.00015367844,0.00038549362,0.00019826657,0.000018139626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092573895,0.00014972816,0.00020047453,0.000052072086,0.00012588291,0.00005931333,0.00015209574,0.000047697427,0.000028828053],"category_scores_gemma":[0.00056358275,0.00009819112,0.00017572925,0.00023387349,0.000040460603,0.00012526332,0.00003384685,0.00007834061,2.0297009e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006816426,0.000013363324,0.00022611872,0.00003824854,0.00012629929,1.8929737e-7,0.00019445695,0.8827992,0.09337458,0.021398043,0.00004672296,0.0017145782],"study_design_scores_gemma":[0.00045106967,0.00011987571,0.0041836277,0.00007239945,0.000046748744,3.0757064e-7,0.00020657723,0.94147813,0.048217673,0.005112353,0.000023210088,0.00008802091],"about_ca_topic_score_codex":0.00033449937,"about_ca_topic_score_gemma":0.000019838548,"teacher_disagreement_score":0.20834137,"about_ca_system_score_codex":0.000113938964,"about_ca_system_score_gemma":0.00005418808,"threshold_uncertainty_score":0.40041178},"labels":[],"label_agreement":null},{"id":"W3119463227","doi":"10.2514/6.2021-0626","title":"A Wholistic Approach to Human-in-the-Loop Ecosystem","year":2021,"lang":"en","type":"article","venue":"AIAA Scitech 2021 Forum","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Context (archaeology); Data science; Analytics; Big data; Space exploration; Resilience (materials science); Computer science; Paradigm shift; Curiosity; Space (punctuation); Psychology; Engineering; Geography","score_opus":0.014224397227146543,"score_gpt":0.2204129625991477,"score_spread":0.20618856537200114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119463227","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4391361,0.0012283779,0.087032095,0.0034858207,0.0031438558,0.0012827835,0.00004906874,0.000817242,0.46382466],"genre_scores_gemma":[0.99535424,0.000011788175,0.00150499,0.0005210059,0.00022409072,0.0002338077,0.00004276261,0.00005172863,0.0020555898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845815,0.00005129786,0.00028333155,0.0003464868,0.00031812946,0.0005426026],"domain_scores_gemma":[0.99910337,0.000041394997,0.000017605804,0.0007179276,0.000036919828,0.00008278492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031881584,0.00020066151,0.00022068167,0.00018188986,0.00009793824,0.00013974468,0.0004419632,0.00007266965,0.00008398555],"category_scores_gemma":[0.00003404183,0.00018713884,0.00007976002,0.0010414543,0.0000111575755,0.00010148163,0.0001703148,0.00019553627,0.00028191833],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006387491,0.00027551778,0.0015645047,0.00047323047,0.0001783455,0.00043514292,0.0011276487,0.6933419,0.0059739454,0.07498305,0.21656656,0.005073742],"study_design_scores_gemma":[0.0009910242,0.000070003654,0.0038845004,0.00022602282,0.000064999695,0.00010252128,0.004348569,0.08103884,0.005340734,0.0011870224,0.9016945,0.0010513045],"about_ca_topic_score_codex":0.000021476226,"about_ca_topic_score_gemma":0.00054108095,"teacher_disagreement_score":0.6851279,"about_ca_system_score_codex":0.00013594716,"about_ca_system_score_gemma":0.000015608466,"threshold_uncertainty_score":0.76313},"labels":[],"label_agreement":null},{"id":"W3120155590","doi":"10.1109/icue49301.2020.9307089","title":"Comprehensive Analysis of Convolutional Neural Network Models for Non-Instructive Load Monitoring","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Convolutional neural network; Sequence (biology); Data mining; Artificial intelligence; Association (psychology); Machine learning; Artificial neural network; Point (geometry); Precision and recall; Energy consumption; Recall; Energy (signal processing); Pattern recognition (psychology); Engineering; Statistics","score_opus":0.030168800658498578,"score_gpt":0.22641238400601646,"score_spread":0.19624358334751787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120155590","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42503667,0.00016405345,0.57035506,0.00008614378,0.00075332966,0.00023398195,0.000025928808,0.00021811627,0.0031267407],"genre_scores_gemma":[0.98752683,0.000013661606,0.0119307805,0.00005725137,0.00038597596,0.000030260228,0.000018222361,0.000018195218,0.000018845889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923897,0.000006766707,0.00021524329,0.0001640347,0.000173433,0.00020157742],"domain_scores_gemma":[0.9995873,0.00006772697,0.000030339748,0.00011927444,0.0001264953,0.000068869216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000027914686,0.00012543026,0.0002832226,0.00006492735,0.000031513075,0.000009824464,0.000117779,0.00003510329,0.000021351483],"category_scores_gemma":[0.000004540513,0.00013240067,0.00016081412,0.0005665498,0.000022486807,0.00011486031,0.000052840955,0.00005576542,0.0000020548143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018526483,0.0000033921783,0.0017004454,0.000036540216,0.0014517457,6.203576e-7,0.000119644945,0.9933026,0.00035151237,0.0017228315,0.0010358049,0.0002563657],"study_design_scores_gemma":[0.00027716332,0.000022113649,0.010295703,0.0000044527005,0.0003239206,1.0886439e-7,0.00012328211,0.98764896,0.0006097575,0.00013770639,0.00043418317,0.00012263811],"about_ca_topic_score_codex":0.000025562893,"about_ca_topic_score_gemma":0.0000048203256,"teacher_disagreement_score":0.56249017,"about_ca_system_score_codex":0.00007175575,"about_ca_system_score_gemma":0.0000084980375,"threshold_uncertainty_score":0.5399143},"labels":[],"label_agreement":null},{"id":"W3121097856","doi":"10.1109/tia.2020.3048643","title":"Stochastic Optimization for Residential Demand Response With Unit Commitment and Time of Use","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"University of Regina","keywords":"Demand response; Flexibility (engineering); Computer science; Power system simulation; Electricity; Environmental economics; Mathematical optimization; Load profile; Pareto principle; Operations research; Electricity generation; Electricity pricing; Load management; Electricity market; Electric power system; Power (physics); Economics; Engineering","score_opus":0.022983368463247816,"score_gpt":0.22461572558633464,"score_spread":0.20163235712308683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121097856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03441873,0.0000061901897,0.96408916,0.0004058471,0.000027893202,0.00072689954,0.00015345759,0.00014435085,0.000027496442],"genre_scores_gemma":[0.99058557,0.0000057485086,0.008191062,0.000061516665,0.000037293616,0.00090681703,0.0000172763,0.000035431018,0.00015929031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994283,0.00002431336,0.00017732615,0.00016057763,0.00010034977,0.00010916829],"domain_scores_gemma":[0.9994569,0.00017334227,0.000033898035,0.00019598269,0.00004844086,0.000091478825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057478963,0.00011642707,0.00011570829,0.0000891599,0.000107118925,0.00002570041,0.000078896686,0.0001090637,0.000053106087],"category_scores_gemma":[0.00000395051,0.0001237652,0.000024123487,0.0002778528,0.00004971645,0.00011087261,0.0000012121604,0.0001743171,0.0000047501712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028577456,0.000038647948,0.000005162374,0.000028295963,0.00007909096,2.09308e-7,0.000079743986,0.9977875,0.0009878878,0.000057144847,0.00040373486,0.00024681096],"study_design_scores_gemma":[0.0010318821,0.00024385752,0.0004149619,0.00003618856,0.00021525084,0.0000033433646,0.00012304065,0.98564,0.00998358,0.000014724394,0.0020733168,0.00021987325],"about_ca_topic_score_codex":0.0000044677345,"about_ca_topic_score_gemma":0.0000030419005,"teacher_disagreement_score":0.95616686,"about_ca_system_score_codex":0.000030166419,"about_ca_system_score_gemma":0.00001821835,"threshold_uncertainty_score":0.5046999},"labels":[],"label_agreement":null},{"id":"W3121266184","doi":"","title":"Distributed Energy Resources: New Markets and New Products","year":2017,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Distributed generation; Order (exchange); Marginal value; Industrial organization; Marginal cost; Core (optical fiber); Electric power; Service (business); Market power; Reliability (semiconductor); Microeconomics; Electric energy; Control (management); Economics; Power (physics); Business; Computer science; Engineering; Renewable energy; Economy; Electrical engineering; Telecommunications; Monopoly; Finance","score_opus":0.007935227029789958,"score_gpt":0.1911972932520101,"score_spread":0.18326206622222013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121266184","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5947444,0.048185218,0.3018465,0.017245494,0.00501637,0.0004043761,0.0000110532455,0.0010885162,0.031458102],"genre_scores_gemma":[0.9764657,0.0087556355,0.0002523277,0.0000436934,0.001958791,0.000002423328,0.0000068117056,0.00005907475,0.012455545],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978517,0.000018377359,0.00019704085,0.00019980087,0.00020099677,0.0015320798],"domain_scores_gemma":[0.99921244,0.0000118644275,0.00008808585,0.00045614882,0.000025084688,0.00020638843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004376186,0.00019593767,0.0001714055,0.00008069589,0.0003054604,0.00027585885,0.00045124366,0.00006172068,0.000023671477],"category_scores_gemma":[0.00008225122,0.00018650907,0.00004400103,0.000071858296,0.00003166241,0.00027863446,0.00010221048,0.0006504099,0.000009088778],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024011184,0.00007140655,0.006806011,0.000083477236,0.0021676305,0.000100620004,0.0004038868,0.02710284,0.0015984048,0.20005015,0.23885188,0.5225236],"study_design_scores_gemma":[0.0017612108,0.0001347199,0.02462692,0.000065995046,0.00010175914,0.0004733319,0.00015423905,0.0032892819,0.00078896794,0.077311136,0.8907124,0.0005800536],"about_ca_topic_score_codex":0.00027925195,"about_ca_topic_score_gemma":0.0010871119,"teacher_disagreement_score":0.65186054,"about_ca_system_score_codex":0.00043769047,"about_ca_system_score_gemma":0.00038518495,"threshold_uncertainty_score":0.76056194},"labels":[],"label_agreement":null},{"id":"W3122796355","doi":"10.5013/ijssst.a.17.41.01","title":"The Impact of Distributed Energy Storage on Total Operation Cost in Power","year":2016,"lang":"en","type":"article","venue":"International Journal of Simulation Systems Science & Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Energy storage; Power (physics); Distributed generation; Energy (signal processing); Environmental science; Computer science; Reliability engineering; Engineering; Physics; Mathematics; Statistics; Thermodynamics","score_opus":0.008512683083250646,"score_gpt":0.2739029302199755,"score_spread":0.2653902471367249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122796355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77327645,0.00007010696,0.22408137,0.00046032007,0.0017437286,0.00007824027,0.00001134828,0.000033708544,0.00024473004],"genre_scores_gemma":[0.99986595,0.0000213291,0.000014442356,0.0000032909154,0.00006356441,0.000005033181,8.149082e-7,0.000006621618,0.000018943085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873394,0.000021763095,0.000493748,0.000092305774,0.00051045563,0.00014779014],"domain_scores_gemma":[0.9989917,0.00013692136,0.00021675657,0.00014990738,0.0004743376,0.000030372616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005465331,0.00008342765,0.00012641815,0.0009842959,0.000038062426,0.000051065254,0.0005252422,0.000055877732,0.000009296082],"category_scores_gemma":[0.00021484004,0.000047465186,0.000049053502,0.00053541485,0.0001738232,0.00037140958,0.000047852536,0.00007548883,0.0000035287953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024375953,0.000016814562,0.0019528273,5.3878495e-7,0.000030483923,0.0000066745247,0.00002370718,0.9787548,0.011584411,0.005316626,0.0000591675,0.0022295297],"study_design_scores_gemma":[0.0012239845,0.00030361488,0.033438053,0.00021205652,0.0000042403362,0.00007238972,0.00021214558,0.95275086,0.00780551,0.0004075584,0.0034168856,0.00015270512],"about_ca_topic_score_codex":0.000017808617,"about_ca_topic_score_gemma":0.0000045731367,"teacher_disagreement_score":0.22658952,"about_ca_system_score_codex":0.00087096886,"about_ca_system_score_gemma":0.00006340071,"threshold_uncertainty_score":0.22775532},"labels":[],"label_agreement":null},{"id":"W3123374022","doi":"","title":"On The Benefits of Behind-the-Meter Rooftop Solar and Energy Storage: The Importance of Retail Rate Design","year":2018,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Investment (military); Peak demand; Battery storage; Environmental economics; Economics; Microeconomics; Natural resource economics; Battery (electricity); Business; Electricity; Agricultural economics; Engineering; Electrical engineering","score_opus":0.035219212911420106,"score_gpt":0.2464097545611465,"score_spread":0.2111905416497264,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123374022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9776891,0.001246054,0.00030328546,0.0008516759,0.0006819116,0.0006588664,0.000037817823,0.00004444296,0.018486874],"genre_scores_gemma":[0.98706746,0.011057881,0.00025312306,0.00010928139,0.00020447788,0.0002716435,0.000008044013,0.000090271664,0.0009378306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977838,0.00044260136,0.00059265015,0.00045569954,0.00026128613,0.0004639707],"domain_scores_gemma":[0.99639463,0.0015937572,0.00019215081,0.0016695872,0.0000920212,0.000057855428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039524715,0.00028664857,0.00040303636,0.00019663414,0.00012320327,0.00007147156,0.0010918345,0.00021062192,0.000068129055],"category_scores_gemma":[0.00032882116,0.00018390095,0.00011580689,0.000103911465,0.00048017985,0.000053377003,0.00092873577,0.00087815634,0.0000019744923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007128256,0.000025229196,0.00076354423,0.000113564114,0.00031324814,0.000003861752,0.00035367734,0.96957284,0.00010989291,0.0027607386,0.0008393332,0.025072796],"study_design_scores_gemma":[0.001347536,0.00060228346,0.035899602,0.0010110292,0.00014567781,0.000010180604,0.0009048988,0.8723933,0.022192102,0.014028726,0.049977344,0.0014873046],"about_ca_topic_score_codex":0.00005732145,"about_ca_topic_score_gemma":0.00039549815,"teacher_disagreement_score":0.09717951,"about_ca_system_score_codex":0.00025404716,"about_ca_system_score_gemma":0.0000875327,"threshold_uncertainty_score":0.7499263},"labels":[],"label_agreement":null},{"id":"W3123422205","doi":"10.1016/j.eneco.2017.05.010","title":"A two-part feed-in-tariff for intermittent electricity generation","year":2017,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tariff; Economics; Electricity; Feed-in tariff; Complementarity (molecular biology); Wind power; Microeconomics; Electricity generation; Renewable energy; Environmental economics; Econometrics; Natural resource economics; Energy policy; International economics; Power (physics); Engineering","score_opus":0.01953039547812931,"score_gpt":0.21260261271211844,"score_spread":0.19307221723398912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123422205","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94289815,0.00008821024,0.024123326,0.00021809962,0.0035565193,0.00013724681,0.000008308917,0.00015029928,0.028819831],"genre_scores_gemma":[0.9963654,0.00019715783,0.0009891111,0.00012842246,0.0010777185,0.00014837336,0.00003214692,0.000044900513,0.0010167495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992245,0.0000069384387,0.00024850792,0.00022105942,0.000026734258,0.00027227294],"domain_scores_gemma":[0.99937207,0.000017356104,0.000065735396,0.00048189893,0.000013678356,0.000049286013],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013115423,0.00015037654,0.00017569994,0.000104364124,0.00011748704,0.00013926426,0.00028859032,0.00005804702,0.000017497243],"category_scores_gemma":[0.00001899699,0.000182348,0.00007018266,0.000020226838,0.00001653033,0.00022497955,0.000060036175,0.00005964853,0.0000068954378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012635788,0.00002952482,0.0028149316,0.000012662158,0.00008661438,0.0000027703109,0.00003096929,0.92408764,0.0004100867,0.043191694,0.0071796514,0.022140818],"study_design_scores_gemma":[0.0005869592,0.000019003352,0.001733351,0.000005275167,0.000009049633,0.0000011601007,0.0000053330377,0.87396437,0.006836418,0.00071464834,0.11591412,0.00021028647],"about_ca_topic_score_codex":0.00021119148,"about_ca_topic_score_gemma":0.0039472273,"teacher_disagreement_score":0.10873447,"about_ca_system_score_codex":0.000273691,"about_ca_system_score_gemma":0.000011281198,"threshold_uncertainty_score":0.7435936},"labels":[],"label_agreement":null},{"id":"W3124725983","doi":"","title":"Electricity demand response in Japan:Experimental evidence from a residential photovoltaic generation system","year":2015,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Electricity; Quarter (Canadian coin); Electricity generation; Environmental economics; Demand response; Electricity demand; Electricity pricing; Business; Economics; Agricultural economics; Environmental science; Power (physics); Electricity market; Engineering; Geography; Electrical engineering","score_opus":0.04240975616456783,"score_gpt":0.2938895013027891,"score_spread":0.2514797451382213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124725983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99359685,0.0014583186,0.00009122767,0.000033958975,0.0012158839,0.0009742595,0.000029784225,0.00018234989,0.002417355],"genre_scores_gemma":[0.9956191,0.0021563778,0.00047366382,0.0000121043395,0.00061743025,0.0007611342,0.00006703634,0.00010601242,0.00018714037],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99583226,0.00090757944,0.0009015353,0.0010356545,0.0004962146,0.00082674803],"domain_scores_gemma":[0.9978726,0.00053494726,0.00011051904,0.0011518784,0.00008133976,0.00024870754],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.004391289,0.0004218078,0.0006154631,0.0010801771,0.000085696134,0.00026340206,0.00077371777,0.0004886712,0.000040555893],"category_scores_gemma":[0.0006546628,0.00052881107,0.00011601863,0.00028161285,0.0000943002,0.0002432878,0.0009680107,0.0013884163,0.000027585562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070070685,0.000053610223,0.0023950583,0.00014613805,0.00009272466,0.000110663284,0.0006742356,0.95277816,0.041551173,0.000013422915,0.00054854434,0.00093554595],"study_design_scores_gemma":[0.00082874746,0.000110740424,0.010791193,0.000578874,0.00001228794,0.000006295194,0.000665952,0.96305925,0.022698501,0.000048031812,0.00062786916,0.00057228695],"about_ca_topic_score_codex":0.0019708627,"about_ca_topic_score_gemma":0.0028829882,"teacher_disagreement_score":0.018852673,"about_ca_system_score_codex":0.009507709,"about_ca_system_score_gemma":0.00052475004,"threshold_uncertainty_score":0.99971634},"labels":[],"label_agreement":null},{"id":"W3124745613","doi":"","title":"On the Role of Maximum Demand Charges in the Presence of Distributed Generation Resources","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Welfare; Electricity; Demand response; Distributed generation; Business; Economics; Microeconomics; Environmental economics; Market economy; Engineering; Electrical engineering","score_opus":0.018867865087767617,"score_gpt":0.24312205622753924,"score_spread":0.22425419113977163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124745613","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9731082,0.00026616076,0.000048128895,0.00039841593,0.000184846,0.0005685314,0.00008620966,0.000017714356,0.025321828],"genre_scores_gemma":[0.9963534,0.0031242848,0.000027779362,0.000009636429,0.00013512642,0.0002401279,0.000025000689,0.000026265401,0.000058371068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835175,0.00029947082,0.00045529034,0.0002997948,0.00026288047,0.00033081835],"domain_scores_gemma":[0.9980482,0.0008538318,0.00009797457,0.0009308752,0.000041013944,0.000028125032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019621411,0.00016932524,0.00026307945,0.00023907436,0.000041498417,0.000039211583,0.00086872414,0.00015105118,0.000030805913],"category_scores_gemma":[0.00033162083,0.00010987377,0.000071204704,0.00011421315,0.00016608571,0.00004103725,0.00040339644,0.00054939056,0.0000020666994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004198201,0.00006668143,0.004060787,0.000149802,0.00009747387,0.0000036079123,0.00090504263,0.9685391,0.0019184215,0.0054854797,0.00035582684,0.018375795],"study_design_scores_gemma":[0.0010381445,0.00019485534,0.05935889,0.0012519315,0.000024739922,0.0000027577055,0.00288743,0.82505107,0.032600656,0.03373814,0.04304051,0.0008108865],"about_ca_topic_score_codex":0.00005699932,"about_ca_topic_score_gemma":0.00022092741,"teacher_disagreement_score":0.14348805,"about_ca_system_score_codex":0.00023066693,"about_ca_system_score_gemma":0.000036597783,"threshold_uncertainty_score":0.44805223},"labels":[],"label_agreement":null},{"id":"W3124895992","doi":"","title":"Optimal Policies to Promote Efficient Distributed Generation of Electricity","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Distributed generation; Electricity; Production (economics); Investment (military); Net metering; Metering mode; Electricity generation; Payment; Set (abstract data type); Environmental economics; Business; Computer science; Economics; Microeconomics; Engineering; Renewable energy; Electrical engineering; Power (physics); Finance","score_opus":0.025427642031545804,"score_gpt":0.27555391802698426,"score_spread":0.25012627599543846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124895992","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.984346,0.00005170971,0.0026523024,0.00018843978,0.00053385814,0.0007808898,0.00015566473,0.00010845003,0.011182693],"genre_scores_gemma":[0.9970026,0.00083546876,0.0011505778,0.000010949567,0.0003706273,0.00027131996,0.000083914136,0.00006864116,0.00020591701],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99786127,0.000083350795,0.0005685571,0.00051486737,0.0002680005,0.00070398586],"domain_scores_gemma":[0.9987805,0.00008682322,0.00007037114,0.00080535276,0.00010590822,0.0001510475],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008757954,0.0002707336,0.00041489876,0.0006492561,0.000052706466,0.000063367064,0.00053294323,0.00023326336,0.00002500858],"category_scores_gemma":[0.00019544236,0.00027548266,0.000105143714,0.00022425057,0.00007537867,0.000034064684,0.00079634,0.00053352356,0.000010454203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017100561,0.000046417324,0.0001867513,0.00010489266,0.00007831519,0.0000036206486,0.00012253597,0.9759516,0.004732618,0.00026690654,0.0002864045,0.01820283],"study_design_scores_gemma":[0.00038322396,0.000100488985,0.0047516967,0.00018866394,0.000010691879,0.0000017398758,0.000043136537,0.94940674,0.029959897,0.00008341203,0.014562007,0.0005082742],"about_ca_topic_score_codex":0.000044425993,"about_ca_topic_score_gemma":0.000072581686,"teacher_disagreement_score":0.02654484,"about_ca_system_score_codex":0.0016028064,"about_ca_system_score_gemma":0.00012072286,"threshold_uncertainty_score":0.9999697},"labels":[],"label_agreement":null},{"id":"W3125500893","doi":"","title":"Building-Integrated Photovoltaics: Distributed Energy Development for Urban Sustainability","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Toronto; Carleton University","funders":"","keywords":"Photovoltaics; Sustainability; Photovoltaic system; Energy development; Environmental economics; Business; Environmental science; Architectural engineering; Natural resource economics; Environmental planning; Renewable energy; Engineering; Economics; Electrical engineering","score_opus":0.0051131586417623425,"score_gpt":0.1962683724760454,"score_spread":0.19115521383428305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125500893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025162533,0.000022522578,0.97112775,0.0000591227,0.0004155553,0.00021212401,0.000010509879,0.00088417483,0.0021057215],"genre_scores_gemma":[0.96892494,0.0000026354546,0.029144099,0.000098084696,0.00013327296,0.00035283255,0.00022880179,0.000053256914,0.0010620864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988105,0.000019576284,0.00030396425,0.00027240108,0.00014198862,0.00045152302],"domain_scores_gemma":[0.9992778,0.00008630095,0.000023319686,0.0003331545,0.00016722144,0.00011221399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026572414,0.00023293494,0.0002077112,0.00009413399,0.000083804014,0.000047695117,0.00021890084,0.000077957455,0.000069202106],"category_scores_gemma":[0.00012939151,0.00021639872,0.000066206776,0.00023173606,0.000025285597,0.00007729814,0.000059086997,0.00006190881,0.000005547053],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006026687,0.000167545,0.002315127,0.0004917691,0.00042876485,0.00000399604,0.00015785612,0.44891548,0.0029047458,0.26591238,0.22821744,0.050424613],"study_design_scores_gemma":[0.00030444367,0.00002217928,0.0005498549,0.000006189282,0.000009804418,3.331623e-7,0.000038863334,0.22784294,0.03818936,0.001303974,0.7314962,0.00023585011],"about_ca_topic_score_codex":0.00012885086,"about_ca_topic_score_gemma":0.00016014339,"teacher_disagreement_score":0.9437624,"about_ca_system_score_codex":0.0005846358,"about_ca_system_score_gemma":0.000039340604,"threshold_uncertainty_score":0.8824484},"labels":[],"label_agreement":null},{"id":"W3125552895","doi":"10.1007/978-981-15-8677-4_4","title":"Smart Electrification of Rural Bangladesh Through Smart Grids","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes on data engineering and communications technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Smart grid; Renewable energy; Electrification; Electric power system; Rural electrification; Engineering; Electricity generation; Electricity; Distributed generation; Grid; Computer science; Environmental economics; Architectural engineering; Power (physics); Electrical engineering; Geography","score_opus":0.027815352780969048,"score_gpt":0.22795789652480344,"score_spread":0.2001425437438344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125552895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020994237,0.31912762,0.48750734,0.01230118,0.0023471953,0.0026349896,0.0029092836,0.026345309,0.14472766],"genre_scores_gemma":[0.7787703,0.14140637,0.066262126,0.000094801384,0.00014112041,0.00021034534,0.010956275,0.00041383345,0.0017447801],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988538,0.000010141773,0.00039986198,0.00030302576,0.00018980105,0.00024337794],"domain_scores_gemma":[0.99371004,0.00032799083,0.000095613155,0.005780171,0.000063907275,0.000022254651],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011062826,0.0004441711,0.0004515273,0.00030490346,0.00008823807,0.000056332465,0.0020844706,0.0005145171,0.000012421327],"category_scores_gemma":[0.00021066569,0.0004547824,0.00006712171,0.000200633,0.00015679208,0.00013653407,0.0007917971,0.0009294303,0.000008804688],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016735967,0.00010627925,0.00005828136,0.0013440956,0.0015920526,0.000009845467,0.00021665398,0.1776058,0.0080232555,0.5689826,0.007324184,0.2347202],"study_design_scores_gemma":[0.00037162393,0.00014267457,0.000118383556,0.0014835692,0.00038933658,0.000030328969,0.00010418246,0.071572125,0.01950005,0.0072470047,0.8975457,0.0014950474],"about_ca_topic_score_codex":0.000018632863,"about_ca_topic_score_gemma":0.00004206444,"teacher_disagreement_score":0.8902215,"about_ca_system_score_codex":0.000087318185,"about_ca_system_score_gemma":0.00001940478,"threshold_uncertainty_score":0.9997904},"labels":[],"label_agreement":null},{"id":"W3127943096","doi":"10.1016/j.segan.2021.100448","title":"Optimal participation of a virtual power plant in electricity market considering renewable energy: A deep learning-based approach","year":2021,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Virtual power plant; Renewable energy; Bidding; Computer science; Electricity market; Electricity; Profit (economics); Time horizon; Electric power system; Wind power; Spinning; Environmental economics; Reliability engineering; Simulation; Mathematical optimization; Power (physics); Engineering; Distributed generation; Electrical engineering; Economics; Microeconomics; Mathematics; Mechanical engineering","score_opus":0.003995874469820913,"score_gpt":0.17517071892592267,"score_spread":0.17117484445610176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127943096","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.107448004,0.004043698,0.87210673,0.0000247322,0.00023179756,0.000094893316,0.000001799153,0.00021382605,0.015834529],"genre_scores_gemma":[0.9968288,0.0005279352,0.0006252208,0.00006078235,0.000090480986,0.00010163031,0.000071787916,0.000050020895,0.0016433465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99821234,0.00012889724,0.00038511833,0.00035186525,0.00019168489,0.0007300861],"domain_scores_gemma":[0.9993533,0.00013901491,0.00006640954,0.00023016136,0.00009553029,0.00011557196],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000348088,0.0002561826,0.00036844806,0.00022532388,0.0000970413,0.00005978571,0.00009573379,0.00016557625,0.00006165007],"category_scores_gemma":[0.000059142665,0.0002843375,0.00006250709,0.00073986157,0.000049702045,0.00014152568,0.00011101117,0.00020290799,8.5013845e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083026534,0.00007931768,0.0009851151,0.00007557156,0.0000702187,0.0001640479,0.00006854686,0.99034995,0.000050004877,0.0059563057,0.0013716916,0.00074622384],"study_design_scores_gemma":[0.00070924923,0.00011225896,0.00069067476,0.000034651137,0.000027491764,0.000007011008,0.0006625158,0.97781944,0.001949827,0.00008434526,0.017602807,0.00029972868],"about_ca_topic_score_codex":0.0008743038,"about_ca_topic_score_gemma":0.0004335445,"teacher_disagreement_score":0.8893808,"about_ca_system_score_codex":0.00016249728,"about_ca_system_score_gemma":0.00006598592,"threshold_uncertainty_score":0.9999609},"labels":[],"label_agreement":null},{"id":"W3128219721","doi":"10.1109/epec48502.2020.9320042","title":"A Review of Recent Advances on Reinforcement Learning for Smart Home Energy Management","year":2020,"lang":"en","type":"review","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Home automation; Computer science; Smart grid; Energy management; Control (management); Risk analysis (engineering); Energy (signal processing); Artificial intelligence; Engineering; Telecommunications; Electrical engineering; Business","score_opus":0.019083074448305606,"score_gpt":0.2502024741589127,"score_spread":0.23111939971060713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128219721","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.2491928e-7,0.9410291,0.029978365,0.000064633714,0.001119911,0.0004151923,0.00000885195,0.00023538282,0.027148485],"genre_scores_gemma":[0.00016116734,0.99596375,0.00014210609,0.0004734887,0.00023259071,0.0010340293,0.00023864786,0.00015119278,0.0016030064],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965201,0.00012769995,0.0012357449,0.00086174783,0.0004927239,0.0007619886],"domain_scores_gemma":[0.9984947,0.00016679133,0.00040497928,0.0005525335,0.00012416813,0.00025684605],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026094698,0.0009649238,0.0023396937,0.00040043812,0.000102320526,0.000059773654,0.0005921269,0.00022894927,0.00019853964],"category_scores_gemma":[0.000041155075,0.0008862916,0.00048049618,0.0010831831,0.000033484568,0.00012692423,0.00013287431,0.00039278716,0.00001550223],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019085554,0.000026788925,1.0746492e-7,0.046009336,0.00075697224,0.000022997318,0.000011423966,0.004164807,0.0000014128447,0.010898419,0.012120556,0.9259681],"study_design_scores_gemma":[0.00031973474,0.0004516465,3.6658832e-7,0.022846857,0.00078979856,0.000009689763,0.0000060863454,0.00400416,0.000029659077,0.00009685366,0.9706101,0.0008350356],"about_ca_topic_score_codex":0.000012460657,"about_ca_topic_score_gemma":0.000007196359,"teacher_disagreement_score":0.95848954,"about_ca_system_score_codex":0.00028781142,"about_ca_system_score_gemma":0.00012306945,"threshold_uncertainty_score":0.9993588},"labels":[],"label_agreement":null},{"id":"W3128303448","doi":"10.1109/epec48502.2020.9320051","title":"Representative Profiling of Prosumers with Local Distributed Energy Resources and Electric Vehicles Using Unsupervised Machine Learning","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Granularity; Cluster analysis; Computer science; Distributed generation; Unsupervised learning; Principal component analysis; Photovoltaic system; Data mining; k-nearest neighbors algorithm; Profiling (computer programming); Load profile; Artificial intelligence; Machine learning; Electricity; Engineering; Renewable energy","score_opus":0.010606157794810401,"score_gpt":0.1935928366485957,"score_spread":0.1829866788537853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128303448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7571358,0.0027556948,0.23867412,0.000119765624,0.00006984973,0.00009672124,0.000010364268,0.00027691564,0.0008607941],"genre_scores_gemma":[0.9980955,0.0011168512,0.00048326963,0.00007664285,0.00006953994,0.000024590687,0.000033645392,0.000059232596,0.00004070137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815214,0.00011049057,0.00037116185,0.0005338328,0.00032110413,0.0005112444],"domain_scores_gemma":[0.9993023,0.00009113059,0.00010604623,0.00016996721,0.00009998413,0.0002305315],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000099904915,0.00037721393,0.00047523784,0.00017453986,0.00013385237,0.00007587345,0.00018487465,0.00010854166,0.00001818081],"category_scores_gemma":[0.000033692755,0.00034589233,0.000048812624,0.0011299208,0.00007585264,0.00018553845,0.00007001132,0.00029254876,4.4755558e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007078633,0.000083001934,0.009893323,0.0002939429,0.0009878825,0.00015453823,0.001859169,0.58423436,0.37596145,0.003692527,0.00035340208,0.021778526],"study_design_scores_gemma":[0.0007885278,0.00042930688,0.0008964139,0.000044800887,0.000098771,0.000020061438,0.00033805004,0.8606222,0.13497825,0.000054862478,0.0012969997,0.00043174683],"about_ca_topic_score_codex":0.00055288186,"about_ca_topic_score_gemma":0.00004364086,"teacher_disagreement_score":0.27638784,"about_ca_system_score_codex":0.00006148686,"about_ca_system_score_gemma":0.000061851446,"threshold_uncertainty_score":0.9998993},"labels":[],"label_agreement":null},{"id":"W3128558301","doi":"10.1109/epec48502.2020.9320090","title":"Demand Side Management using Model-Free Fuzzy Controller in a Direct Load Control Program","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Siemens","keywords":"Thermostat; Controller (irrigation); Computer science; Control theory (sociology); Electric power system; Demand response; Load management; Control engineering; Operator (biology); Load profile; Fuzzy logic; Grid; Load following power plant; Power (physics); Base load power plant; Control (management); Engineering; Electricity","score_opus":0.010820786656187461,"score_gpt":0.20111619839265044,"score_spread":0.19029541173646297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128558301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16870607,0.007669921,0.49111447,0.0016954411,0.0014104221,0.0017515083,0.00003937586,0.00270044,0.32491234],"genre_scores_gemma":[0.9963862,0.0010083845,0.0011316736,0.0007291494,0.00014472699,0.00022617086,0.0000049130094,0.000070895854,0.00029791307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975338,0.000071184004,0.00050072116,0.0006335123,0.00043394562,0.0008268682],"domain_scores_gemma":[0.9991598,0.00005366678,0.00006568639,0.0003556911,0.00006935299,0.0002957802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019467965,0.00048418724,0.0006576487,0.00019490131,0.0000801687,0.00014828202,0.00042353975,0.000144303,0.00002884158],"category_scores_gemma":[0.000031995,0.00049250096,0.00011057791,0.0007322409,0.00003594612,0.0002067999,0.000100272206,0.00026450437,0.000008580528],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020160816,0.000103737206,0.00016360918,0.000099482626,0.00048483492,0.00019084087,0.00024581733,0.9664139,0.004772638,0.005283533,0.0040639266,0.017976077],"study_design_scores_gemma":[0.0033889194,0.0001600178,0.00034665136,0.000042120504,0.00012223874,0.0000059287963,0.000033102257,0.98793346,0.0007135946,0.0009060715,0.005780422,0.00056748604],"about_ca_topic_score_codex":0.00012453338,"about_ca_topic_score_gemma":0.0001274531,"teacher_disagreement_score":0.8276801,"about_ca_system_score_codex":0.00020801692,"about_ca_system_score_gemma":0.00006751246,"threshold_uncertainty_score":0.99975264},"labels":[],"label_agreement":null},{"id":"W3128711752","doi":"10.4018/jgim.2021030109","title":"Modeling Residential Energy Consumption","year":2021,"lang":"en","type":"article","venue":"Journal of Global Information Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"University of Warwick","keywords":"Electricity; Consumption (sociology); Energy consumption; Environmental economics; Energy management; Computer science; Service (business); Analytics; Consumer behaviour; Energy (signal processing); Business; Marketing; Data science; Economics; Statistics","score_opus":0.009015688599354055,"score_gpt":0.21496034064410682,"score_spread":0.20594465204475276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128711752","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022436492,0.0003524432,0.9357193,0.00016401174,0.0019484909,0.0000395452,0.0000035094902,0.00007776737,0.03925845],"genre_scores_gemma":[0.99015576,0.0013548614,0.007846561,0.00035727298,0.00018211556,0.0000034411553,0.000017830593,0.000007249562,0.00007493166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987864,0.000017662001,0.00060315843,0.000042494943,0.0003993542,0.00015092296],"domain_scores_gemma":[0.99952614,0.000003918705,0.00009921616,0.0001392422,0.00016709059,0.00006438299],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018347744,0.00010120037,0.00012684059,0.00010829237,0.000038104514,0.00013089101,0.0001378013,0.00003502788,0.00010917625],"category_scores_gemma":[0.000008278455,0.00010653042,0.000087016946,0.00021010944,0.0000073246765,0.0011644211,0.000075632735,0.00006184689,0.000056208184],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010463204,0.00000883993,0.000079817444,0.00007767195,0.0001714913,0.00003657573,0.000019246909,0.9464844,0.000006096334,0.025840467,0.015458788,0.011806174],"study_design_scores_gemma":[0.001029201,0.00002451779,0.0023723484,0.000101794176,0.0001229305,0.00010611273,0.0003601494,0.85405904,0.00022064544,0.0015763235,0.13981092,0.00021602577],"about_ca_topic_score_codex":0.000005323902,"about_ca_topic_score_gemma":0.000010829589,"teacher_disagreement_score":0.96771926,"about_ca_system_score_codex":0.00032139244,"about_ca_system_score_gemma":0.000013562706,"threshold_uncertainty_score":0.43441844},"labels":[],"label_agreement":null},{"id":"W3132337940","doi":"10.1016/j.ijepes.2020.106731","title":"Demand response integrated day-ahead energy management strategy for remote off-grid hybrid renewable energy systems","year":2021,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Demand response; Energy management; Intermittent energy source; Environmental economics; Computer science; Electric power system; Energy management system; Smart grid; Peak demand; Grid; Energy storage; Incentive; Reliability engineering; Distributed generation; Engineering; Energy (signal processing); Power (physics); Electricity; Electrical engineering; Economics","score_opus":0.009909350893998614,"score_gpt":0.22838828675813258,"score_spread":0.21847893586413397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132337940","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032113001,0.018598488,0.9486388,0.00027676942,0.018820312,0.00014912758,0.0000922629,0.00023081442,0.009982136],"genre_scores_gemma":[0.9812765,0.0026829834,0.0005037917,0.00023060026,0.0021418494,0.000057055626,0.00015471785,0.00015613728,0.012796347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9949081,0.00055096514,0.0018377092,0.0005339247,0.00139661,0.0007727028],"domain_scores_gemma":[0.99664456,0.00051756995,0.0005446598,0.0005155343,0.0014186205,0.0003590881],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011789483,0.00056364905,0.0008542936,0.0009984259,0.00010361998,0.00048580059,0.0010635866,0.00020760547,0.000044930046],"category_scores_gemma":[0.00017605245,0.00053775567,0.00043752848,0.0006874876,0.000044342476,0.00039366464,0.00013585157,0.00027425025,0.000005213137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007305361,0.00014449282,0.000011707621,0.00003491267,0.002297421,0.001711424,0.000015031615,0.86244184,0.0027506792,0.016297683,0.1090555,0.0045087687],"study_design_scores_gemma":[0.0013952208,0.00028915584,0.00004080523,0.00031306208,0.00010556513,0.00090056227,0.00007815716,0.34428737,0.006258133,0.0003576598,0.64553756,0.00043673895],"about_ca_topic_score_codex":0.0010085239,"about_ca_topic_score_gemma":0.000110512156,"teacher_disagreement_score":0.9780652,"about_ca_system_score_codex":0.0012772201,"about_ca_system_score_gemma":0.00023138375,"threshold_uncertainty_score":0.9997074},"labels":[],"label_agreement":null},{"id":"W3134120822","doi":"10.3390/en14051387","title":"A Methodology for the Enhancement of the Energy Flexibility and Contingency Response of a Building through Predictive Control of Passive and Active Storage","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; Concordia University","funders":"","keywords":"Setpoint; Thermal energy storage; Flexibility (engineering); Demand response; Peak demand; Thermal mass; Energy storage; Computer science; Load shifting; Smart grid; Automotive engineering; Reliability engineering; Energy management; Model predictive control; Simulation; Engineering; Energy (signal processing); Thermal; Electricity; Control (management); Electrical engineering; Power (physics)","score_opus":0.024924411233179938,"score_gpt":0.26721670881102877,"score_spread":0.24229229757784884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134120822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7216088,0.002522052,0.2752412,0.00011402408,0.0002339448,0.0001496278,0.0000392655,0.0000128221045,0.000078228906],"genre_scores_gemma":[0.9950336,0.0003697252,0.0043599578,0.00002703091,0.000029815012,0.00011481701,8.907946e-7,0.000012262749,0.000051890256],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99898297,0.000330693,0.00027028777,0.00016840638,0.000116178104,0.00013148334],"domain_scores_gemma":[0.99694586,0.0024830915,0.00014123571,0.0002867829,0.0001297191,0.00001332108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047334202,0.0001159841,0.00031035137,0.000029136303,0.000049422382,0.0000045330526,0.00011125548,0.000047736034,0.000005997538],"category_scores_gemma":[0.00060546066,0.00007806778,0.00006967941,0.000119586526,0.00023398011,0.000060346487,0.00012914785,0.000051829124,6.2617307e-9],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012837852,0.000046692294,0.0002540512,0.00021217288,0.0010925159,0.0000013008919,0.0049691102,0.44740692,0.5110615,0.02916818,0.00012167726,0.0043821214],"study_design_scores_gemma":[0.00078721606,0.00012401091,0.007477443,0.0000526094,0.00015315521,0.0000012784112,0.0021912784,0.01954145,0.96660936,0.0015911012,0.0013930548,0.000078026824],"about_ca_topic_score_codex":0.00009144478,"about_ca_topic_score_gemma":0.000041345782,"teacher_disagreement_score":0.4555479,"about_ca_system_score_codex":0.000032190863,"about_ca_system_score_gemma":0.00003092477,"threshold_uncertainty_score":0.31835118},"labels":[],"label_agreement":null},{"id":"W3134182014","doi":"10.1049/iet-gtd.2020.1113","title":"Two‐stage robust optimal scheduling of cooperative microgrids based on expected scenarios","year":2020,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Mathematical optimization; Grid; Robust optimization; Renewable energy; Scheduling (production processes); Constraint (computer-aided design); Operations research; Engineering; Mathematics","score_opus":0.02489709971112645,"score_gpt":0.2258664783501438,"score_spread":0.20096937863901737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134182014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16880947,0.00011689237,0.8293233,0.00063713535,0.00022052256,0.00026894332,0.00015278862,0.00029946523,0.0001714888],"genre_scores_gemma":[0.98556846,0.000041172174,0.011116911,0.00017136049,0.00028016363,0.000043656877,0.002718818,0.000037572412,0.000021887236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985557,0.000083270876,0.0004455435,0.0003356203,0.00033568952,0.00024413214],"domain_scores_gemma":[0.999401,0.000024229505,0.00006199854,0.00019657062,0.00013999388,0.00017623494],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012880722,0.00026195426,0.00024018653,0.000064449094,0.00013440487,0.000057460144,0.00013476367,0.00010706449,0.00029641978],"category_scores_gemma":[0.000030261805,0.0002646981,0.00010672853,0.00044790268,0.000034346824,0.00016033444,0.000011296156,0.00018994168,0.000018167913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059855724,0.000057142555,0.000024179695,0.00004945745,0.000024911547,0.000003429852,0.00012922473,0.77013934,0.22619838,0.00024536997,0.0018956878,0.001173019],"study_design_scores_gemma":[0.00086217583,0.00010856076,0.00008815209,0.000035092773,0.000022249224,2.7142175e-7,0.00005660133,0.6700874,0.32376269,3.8940885e-7,0.004799756,0.00017664723],"about_ca_topic_score_codex":0.000008141683,"about_ca_topic_score_gemma":0.0000024495473,"teacher_disagreement_score":0.81820637,"about_ca_system_score_codex":0.00013153396,"about_ca_system_score_gemma":0.00004833483,"threshold_uncertainty_score":0.9999805},"labels":[],"label_agreement":null},{"id":"W3134694222","doi":"10.1109/access.2021.3061995","title":"Coordination of Smart Home Energy Management Systems in Neighborhood Areas: A Systematic Review","year":2021,"lang":"en","type":"review","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Computer science; Risk analysis (engineering); Smart grid; Grid; Process (computing); Electricity; Distributed computing; Process management; Business; Engineering","score_opus":0.027096490136148326,"score_gpt":0.28315624639910564,"score_spread":0.2560597562629573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134694222","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[4.3240996e-7,0.99036735,0.002366607,0.0000053000053,0.0024004416,0.0020203919,0.0000165132,0.00015743643,0.002665532],"genre_scores_gemma":[0.00029646445,0.99569327,0.000010604823,0.000029523993,0.00011478962,0.0032276378,0.00012302911,0.00013615355,0.00036854824],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.99624634,0.00036084937,0.0020042937,0.00048067886,0.00053139916,0.00037642114],"domain_scores_gemma":[0.99797964,0.00013958316,0.000534165,0.0011787318,0.00009229151,0.00007557601],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005978693,0.0006244004,0.0041441564,0.000739792,0.00001995842,0.00013502498,0.001133905,0.00020332953,0.00002118171],"category_scores_gemma":[0.000031598804,0.00056775135,0.0004408496,0.0016964654,0.000015075223,0.0002611258,0.00021997957,0.00020026826,0.000024755438],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.261414e-7,0.0000361304,0.0000014435777,0.97166175,0.0008220079,0.000095271476,0.0000038611392,0.004124682,1.6565904e-8,0.0022605136,0.0028483872,0.018145602],"study_design_scores_gemma":[0.00013301885,0.000010794476,0.0000015921188,0.83088976,0.0025199228,0.000018827039,0.0000084327985,0.0019027125,5.5758517e-7,0.0000099596,0.16401166,0.00049278536],"about_ca_topic_score_codex":0.00009912552,"about_ca_topic_score_gemma":0.00005808972,"teacher_disagreement_score":0.16116327,"about_ca_system_score_codex":0.0005217793,"about_ca_system_score_gemma":0.00003673338,"threshold_uncertainty_score":0.9996774},"labels":[],"label_agreement":null},{"id":"W3135033642","doi":"10.1109/picc51425.2020.9362420","title":"Demand Response and Energy Storage System Participation in North American Electricity Markets","year":2020,"lang":"en","type":"article","venue":"2020 International Conference on Power, Instrumentation, Control and Computing (PICC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Environmental economics; Demand response; Software deployment; Electricity; Renewable energy; Energy storage; Electric power system; Electricity market; Timeline; Business; Computer science; Power (physics); Engineering; Economics; Marketing; Electrical engineering","score_opus":0.008471396206406289,"score_gpt":0.22609280051903946,"score_spread":0.21762140431263316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135033642","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96290684,0.00003706231,0.034151178,0.0011662759,0.00029391953,0.000107125226,0.000014554518,0.00013776709,0.0011852941],"genre_scores_gemma":[0.9988987,0.000071529685,0.00017359173,0.00069844205,0.00007752958,0.0000238631,0.000024390583,0.000016668888,0.000015282625],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987166,0.00016171265,0.00036250494,0.00030276523,0.00025217808,0.00020423348],"domain_scores_gemma":[0.9994807,0.00013508322,0.00011102231,0.00008372198,0.0000715699,0.0001178592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019956478,0.00018764967,0.00022439753,0.00013021853,0.00006929228,0.0001268682,0.00013571436,0.000028570097,0.000017364495],"category_scores_gemma":[0.0000617239,0.00020293436,0.00002471931,0.00025422534,0.00004302159,0.00014195702,0.00004462466,0.00012600125,0.0000039822407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005814052,0.0002271488,0.4258649,0.00022729448,0.0009656724,0.00018014373,0.0056792847,0.38944137,0.004327264,0.05513844,0.0016069207,0.110527486],"study_design_scores_gemma":[0.0009763815,0.00012219843,0.4008199,0.000022729271,0.000010134511,0.0000027132853,0.00022351356,0.5973115,0.000055160144,0.000012591673,0.00031275928,0.00013040341],"about_ca_topic_score_codex":0.00006129012,"about_ca_topic_score_gemma":0.00011699393,"teacher_disagreement_score":0.20787013,"about_ca_system_score_codex":0.00013571267,"about_ca_system_score_gemma":0.000022117478,"threshold_uncertainty_score":0.8275423},"labels":[],"label_agreement":null},{"id":"W3135388229","doi":"10.3390/en14061553","title":"Simulation of Energy Exchange between Single Prosumer Residential Building and Utility Grid","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Teadmistepõhise Ehituse Tippkeskus ZEBE; European Regional Development Fund","keywords":"Prosumer; Microgrid; Photovoltaic system; Electricity; Wind power; Environmental economics; Renewable energy; Computer science; Production (economics); Energy storage; Automotive engineering; Environmental science; Reliability engineering; Engineering; Electrical engineering; Economics; Microeconomics","score_opus":0.019531568241854383,"score_gpt":0.22777938105968762,"score_spread":0.20824781281783322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135388229","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97963566,0.0016444307,0.015343468,0.000028869566,0.00056143757,0.000030034187,0.000008884468,0.00017684323,0.002570405],"genre_scores_gemma":[0.9982238,0.000090257825,0.0009965245,0.000008289786,0.00038709823,0.000008186113,0.000026498801,0.000023617717,0.00023576387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99927974,0.00003183661,0.00020113257,0.00017139161,0.00015705336,0.00015886204],"domain_scores_gemma":[0.99958825,0.00009658572,0.000030556126,0.00020621458,0.000044435485,0.000033935554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000085434964,0.00011348425,0.00016701334,0.000079437355,0.0000373912,0.000030976185,0.00006297219,0.000053529748,0.00005158434],"category_scores_gemma":[0.000042399402,0.00012734869,0.000036095364,0.00016442892,0.00003375484,0.00015137356,0.000090628135,0.00004092386,7.266897e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031425332,0.000010697361,0.0028384218,0.0001052299,0.00006297055,0.0000054314482,0.000089429275,0.98099893,0.007830564,0.00056870055,0.00056241086,0.00692407],"study_design_scores_gemma":[0.0004895597,0.00003476855,0.053889643,0.00008861539,0.00009811634,0.0000013307099,0.000105592866,0.14293092,0.681579,0.0007525862,0.11962449,0.00040535358],"about_ca_topic_score_codex":0.00006902457,"about_ca_topic_score_gemma":0.000076431745,"teacher_disagreement_score":0.838068,"about_ca_system_score_codex":0.000027751745,"about_ca_system_score_gemma":0.000006548524,"threshold_uncertainty_score":0.51931286},"labels":[],"label_agreement":null},{"id":"W3136513999","doi":"10.18280/jesa.540102","title":"Optimal Operation of Micro-Grids to Reduce Energy Production Costs and Environmental Pollution Using Ant Colony Optimization Algorithm (ACO)","year":2021,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ant colony optimization algorithms; Renewable energy; Wind power; Computer science; Environmental pollution; Reliability (semiconductor); Grid; Production (economics); Energy management; Electricity generation; Electric potential energy; Electric power; Reliability engineering; Energy (signal processing); Mathematical optimization; Algorithm; Power (physics); Environmental science; Engineering; Electrical engineering","score_opus":0.009314010419615474,"score_gpt":0.2132338833818908,"score_spread":0.20391987296227534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136513999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5732404,0.000999649,0.42443362,0.00007081653,0.0009481695,0.00011542504,0.00001552856,0.00008808564,0.0000883102],"genre_scores_gemma":[0.7787072,0.0009410594,0.21961296,0.00003422508,0.00040825698,0.000008282573,0.00003818891,0.000060043392,0.00018976415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985702,0.0001475607,0.0005061862,0.00023851743,0.00029311943,0.0002444063],"domain_scores_gemma":[0.99947965,0.000012523691,0.00013190063,0.00017539882,0.000074637406,0.00012586021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002431272,0.00020193773,0.0002453724,0.00021840144,0.0001944448,0.0001381698,0.00009008464,0.00006694554,0.0000395345],"category_scores_gemma":[0.00004181443,0.0002187254,0.0000520269,0.00027525658,0.000050242434,0.00044023263,0.000086491025,0.00011328413,0.0000028757206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007617938,0.00003511144,0.00007086112,0.00003761214,0.00007602131,0.000029083261,0.00017058694,0.7952117,0.15824836,0.000025562484,0.00042588473,0.045661595],"study_design_scores_gemma":[0.00030898306,0.000088113564,0.014304993,0.00019582534,0.00006906808,0.0011303783,0.00023793332,0.90557086,0.07744229,0.000008901665,0.0004223756,0.00022028426],"about_ca_topic_score_codex":0.000025882735,"about_ca_topic_score_gemma":0.000004607199,"teacher_disagreement_score":0.20546684,"about_ca_system_score_codex":0.0007411956,"about_ca_system_score_gemma":0.000042023872,"threshold_uncertainty_score":0.89193624},"labels":[],"label_agreement":null},{"id":"W3136913392","doi":"10.2139/ssrn.3332435","title":"Examining Interconnection and Net Metering Policy for Distributed Generation in the United States","year":2017,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Net metering; Metering mode; Interconnection; Business; Net (polyhedron); Computer science; Distributed generation; Telecommunications; Engineering; Electrical engineering; Mathematics; Renewable energy","score_opus":0.026897830388792256,"score_gpt":0.25255749084362455,"score_spread":0.2256596604548323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136913392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8344527,0.00015257623,0.16450968,0.0005586749,0.00016390643,0.000084038795,0.0000023235082,0.000024396264,0.00005170923],"genre_scores_gemma":[0.9978152,0.00148353,0.00008756321,0.00003720951,0.00046789224,0.000019969897,0.000050687257,0.000015665908,0.000022305878],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904984,0.000030608357,0.00013971247,0.0000791821,0.000064563064,0.00063607906],"domain_scores_gemma":[0.99974424,0.000032676362,0.000050468963,0.00013573075,0.000017851144,0.00001901122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008825527,0.000087699154,0.00007535801,0.00016002204,0.00025139307,0.00022485745,0.00016810875,0.000027319584,9.420352e-7],"category_scores_gemma":[0.00008287062,0.00007134878,0.000018165789,0.00006190908,0.000015490648,0.00020679913,0.000024494371,0.00034439765,4.879778e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003569431,0.000022302716,0.002886717,0.000034997654,0.00030321247,0.000004349635,0.0012934676,0.9035975,0.0034480004,0.047018044,0.0006205178,0.04073522],"study_design_scores_gemma":[0.0011898937,0.0002722793,0.01182649,0.000030060262,0.000039486393,0.00013544182,0.0024626262,0.95663667,0.00058754854,0.017821372,0.008756676,0.00024145535],"about_ca_topic_score_codex":0.00025601694,"about_ca_topic_score_gemma":0.002039477,"teacher_disagreement_score":0.16442212,"about_ca_system_score_codex":0.00041914298,"about_ca_system_score_gemma":0.000037430415,"threshold_uncertainty_score":0.29095188},"labels":[],"label_agreement":null},{"id":"W3137225947","doi":"10.3390/s21062152","title":"Recent Advances in Internet of Things (IoT) Infrastructures for Building Energy Systems: A Review","year":2021,"lang":"en","type":"review","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Internet of Things; Building automation; Energy consumption; Computer science; Efficient energy use; Greenhouse gas; Systems engineering; Architectural engineering; Risk analysis (engineering); Engineering; Computer security","score_opus":0.0171714034897836,"score_gpt":0.28067637496583303,"score_spread":0.26350497147604945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3137225947","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000018168917,0.9953024,0.0013568699,0.0000058525584,0.0016463473,0.0005653551,0.000013866194,0.00009896965,0.001008571],"genre_scores_gemma":[0.0000024094763,0.9977603,0.0014291394,0.000036148467,0.00015460147,0.0002658811,0.000094573355,0.00010823453,0.00014874492],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99791706,0.00012551395,0.0010621164,0.0003660482,0.00021044393,0.00031880176],"domain_scores_gemma":[0.99899125,0.00019564474,0.0002748541,0.0004225001,0.000064866705,0.00005089841],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028854236,0.00045103874,0.0021269317,0.00029908042,0.000010700657,0.000023606064,0.00033195788,0.00017848014,0.000031740787],"category_scores_gemma":[0.0001603872,0.00040206587,0.00033596484,0.0005030929,0.000020926129,0.000071439004,0.00010309792,0.00021081633,0.0000015599691],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.828391e-7,0.0000043153277,2.2274406e-7,0.15647897,0.00015331892,0.000009995564,0.000021657424,0.04117827,1.0623736e-7,0.0013151728,0.0035629692,0.7972743],"study_design_scores_gemma":[0.00006420841,0.000010247502,9.9225566e-8,0.14156584,0.00023884169,0.000012971019,0.000011858639,0.0044010137,0.0000044761673,0.00001610814,0.8533902,0.0002841227],"about_ca_topic_score_codex":0.00003334854,"about_ca_topic_score_gemma":0.000013111439,"teacher_disagreement_score":0.84982723,"about_ca_system_score_codex":0.00028534303,"about_ca_system_score_gemma":0.00003797038,"threshold_uncertainty_score":0.9998431},"labels":[],"label_agreement":null},{"id":"W3139172156","doi":"10.3389/fenrg.2022.831462","title":"Industrial Flexibility as Demand Side Response for Electrical Grid Stability","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"H2020 Marie Skłodowska-Curie Actions; Horizon 2020 Framework Programme; Swiss Competence Center for Energy Research – Supply of Electricity","keywords":"Renewable energy; Electricity; Grid; Flexibility (engineering); Environmental economics; Demand response; Electric power system; Scheduling (production processes); Wind power; Computer science; Unit cost; Operations management; Engineering; Economics; Electrical engineering; Power (physics); Microeconomics","score_opus":0.07530064683355576,"score_gpt":0.3108309628670985,"score_spread":0.23553031603354274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139172156","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9674053,0.0010939216,0.021638462,0.0005763743,0.0044053467,0.00080850127,0.00006267823,0.00030580853,0.003703599],"genre_scores_gemma":[0.9949999,0.00007141377,0.0014956486,0.000051826963,0.0005029947,0.0017557505,0.00005779342,0.000072449046,0.0009922186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9954502,0.0015238103,0.00042936273,0.0005826227,0.0009845432,0.0010294488],"domain_scores_gemma":[0.99836093,0.00065403874,0.000023224737,0.0006986465,0.00008559032,0.00017754763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0076051787,0.00019669704,0.0003271856,0.00077239366,0.0003397966,0.000051545358,0.00065591093,0.00013901516,0.00016373697],"category_scores_gemma":[0.0012800345,0.00022811133,0.00010744188,0.0015603289,0.0001425127,0.000116004616,0.00043245932,0.00093885907,0.0000033996728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0058316616,0.00022721435,0.006602939,0.000030019484,0.000103814986,0.00004956519,0.00020824237,0.74211425,0.00082992716,0.001365768,0.22925898,0.013377608],"study_design_scores_gemma":[0.0023328613,0.0007013469,0.003068645,0.000007390646,0.000010542225,0.0000045003935,0.00072423345,0.32156682,0.008630259,0.006748513,0.6557901,0.0004147718],"about_ca_topic_score_codex":0.00035541784,"about_ca_topic_score_gemma":0.00007721602,"teacher_disagreement_score":0.4265311,"about_ca_system_score_codex":0.0022194544,"about_ca_system_score_gemma":0.0002469476,"threshold_uncertainty_score":0.93021095},"labels":[],"label_agreement":null},{"id":"W3139436443","doi":"10.1145/3263878","title":"Session details: Special Issue on the 2016 Greenmetrics Workshop","year":2016,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Information and Communications Technology; Session (web analytics); Sustainability; Flexibility (engineering); Work (physics); Data sharing; Computer science; Engineering management; Telecommunications; Engineering; World Wide Web; Management","score_opus":0.06319556094292249,"score_gpt":0.2982584745686394,"score_spread":0.2350629136257169,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139436443","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16053683,0.42923957,0.02533058,0.050104965,0.03482007,0.014101455,0.000048524722,0.0024354155,0.2833826],"genre_scores_gemma":[0.1293042,0.8549136,0.00095155597,0.0031786694,0.007343362,0.0006913936,0.000029388688,0.00012816898,0.0034596657],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970832,0.00018237186,0.0005848865,0.00032432986,0.0014392153,0.00038603766],"domain_scores_gemma":[0.9969316,0.0011838708,0.00015443517,0.0013636837,0.00027535512,0.00009105524],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0040670065,0.00029757796,0.00032267935,0.00056682626,0.00016318925,0.00004923683,0.0008347781,0.00009361767,0.004795835],"category_scores_gemma":[0.0057317456,0.00016133227,0.00011919912,0.0037537422,0.000039189512,0.0003895722,0.00017518422,0.00020417475,0.0035672246],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026492596,0.000013922595,0.00032805774,0.00022958477,0.000025726365,4.6086512e-7,0.000008097273,0.0034234177,0.000010059784,0.0000933368,0.2831291,0.7127356],"study_design_scores_gemma":[0.00042535563,0.00006217876,0.005573808,0.0033153242,0.00016334277,0.0000018145984,0.000009113226,0.019382462,0.00049969694,0.000082380444,0.9701185,0.00036602118],"about_ca_topic_score_codex":7.729655e-7,"about_ca_topic_score_gemma":0.0000014245555,"teacher_disagreement_score":0.71236956,"about_ca_system_score_codex":0.00043700146,"about_ca_system_score_gemma":0.00004837183,"threshold_uncertainty_score":0.9972086},"labels":[],"label_agreement":null},{"id":"W3140391559","doi":"10.1109/isgt49243.2021.9372233","title":"Interface Module for Smart Load Participants in a Transactive Energy Environment- Design and Implementation","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Computer science; Nash equilibrium; Smart grid; Interface (matter); Distributed computing; Energy supply; Energy (signal processing); Electrical engineering; Operating system; Engineering; Economics","score_opus":0.021869973918079273,"score_gpt":0.2450933964030975,"score_spread":0.22322342248501822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3140391559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.095671855,0.00020222533,0.90339667,0.00006795493,0.00008620274,0.00015237172,0.0000035941391,0.000046449768,0.00037267283],"genre_scores_gemma":[0.98748606,0.0001710082,0.011902585,0.000044352637,0.000012701192,0.00016208064,0.000008157527,0.000017135642,0.00019588698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993419,0.00002571812,0.00015148915,0.00017285268,0.00007782421,0.00023020223],"domain_scores_gemma":[0.9997928,0.00004631064,0.000009323907,0.00010153597,0.000007732133,0.000042304884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010396458,0.000100298435,0.000103930994,0.000036587546,0.000017987011,0.000019064095,0.000035073026,0.000026263117,0.0002250424],"category_scores_gemma":[0.0000031375318,0.000111144436,0.00001934613,0.000055161614,0.000008876217,0.00010666225,0.0000121402745,0.000026990725,0.0000035905905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020893764,0.000026466476,0.0003790053,0.000027156182,0.000085486245,0.0000055091036,0.00037161855,0.9608347,0.0062944875,0.00040707664,0.00039392815,0.03115369],"study_design_scores_gemma":[0.001168314,0.00004772327,0.004939101,0.000009370718,0.000027458977,9.85862e-7,0.0005384895,0.6727645,0.31535974,0.00045052447,0.004505991,0.00018782694],"about_ca_topic_score_codex":0.00009867414,"about_ca_topic_score_gemma":0.00076169707,"teacher_disagreement_score":0.89181423,"about_ca_system_score_codex":0.00011072474,"about_ca_system_score_gemma":0.00000826002,"threshold_uncertainty_score":0.45323384},"labels":[],"label_agreement":null},{"id":"W3141148964","doi":"10.1016/j.epsr.2021.107181","title":"A unified state space model for aggregation and coordination of large-scale TCLs and EVs for frequency regulation","year":2021,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Microgrid; Control theory (sociology); Population; State space; SIGNAL (programming language); State of charge; Control (management); Engineering; Computer science; Control engineering; Power (physics); Physics; Mathematics; Battery (electricity)","score_opus":0.025107833870937225,"score_gpt":0.29022602006782766,"score_spread":0.2651181861968904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3141148964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24048407,0.0026847746,0.7545913,0.00016011663,0.00016119954,0.0010695155,0.000026989033,0.000058653382,0.00076340564],"genre_scores_gemma":[0.9948073,0.00014615488,0.0014930968,0.0000023787914,0.000029269524,0.00028020085,0.00003695767,0.000029375897,0.0031752337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988431,0.00007576666,0.00023519932,0.00021875852,0.00029715186,0.0003300436],"domain_scores_gemma":[0.99904174,0.0001762114,0.000041111656,0.00018494614,0.0005015747,0.00005440726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011775611,0.00009139446,0.00016731973,0.00030724204,0.000093487295,0.00006056669,0.000058375415,0.000066818,0.0000016546468],"category_scores_gemma":[0.00017352558,0.000099643985,0.000023334958,0.000529096,0.000014813085,0.00015356453,0.000026870339,0.00008356219,5.208226e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018598877,0.00013726327,0.0008653451,0.004354421,0.00036078473,0.0000047923886,0.0036212574,0.6483948,0.24007398,0.06970538,0.02425885,0.008037087],"study_design_scores_gemma":[0.00066042045,0.000082059865,0.00074077793,0.000053952717,0.000008643619,0.0000024096555,0.000107909415,0.98274934,0.012245325,0.0019190139,0.0013355264,0.00009461712],"about_ca_topic_score_codex":0.00003984867,"about_ca_topic_score_gemma":0.00005452985,"teacher_disagreement_score":0.75432324,"about_ca_system_score_codex":0.0001447558,"about_ca_system_score_gemma":0.00005558519,"threshold_uncertainty_score":0.40633637},"labels":[],"label_agreement":null},{"id":"W3142597781","doi":"10.1109/tpec51183.2021.9384929","title":"Optimal Device Sizing for Zero Energy Buildings: Sensitivity of Nonlinear Model to Uncertainties","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Sizing; Zero-energy building; Renewable energy; Photovoltaic system; Sensitivity (control systems); Greenhouse gas; Thermal energy storage; Environmental science; Energy (signal processing); Computer science; Automotive engineering; Engineering; Electrical engineering; Electronic engineering; Mathematics","score_opus":0.018590748288709873,"score_gpt":0.23352626865410314,"score_spread":0.21493552036539326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142597781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12596248,0.00006741123,0.87054044,0.00013694986,0.00020115248,0.000057731566,0.000012654193,0.00017832448,0.0028428743],"genre_scores_gemma":[0.66522706,0.00001996368,0.33351585,0.00026399063,0.000084223924,0.000021340928,0.00001367658,0.000036235077,0.00081766123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919826,0.000013253934,0.00020144197,0.00020081276,0.00013341248,0.00025281438],"domain_scores_gemma":[0.9994392,0.00011093745,0.000017323659,0.0002337964,0.00013295808,0.00006577937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016681271,0.00014379944,0.00021809773,0.000077089615,0.000032694938,0.000022750442,0.00007428867,0.00004664738,0.000011330067],"category_scores_gemma":[0.00006451972,0.00015716538,0.000079697296,0.0001951267,0.000011349784,0.00008795362,0.000112395195,0.00003871894,0.0000022550532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071089908,0.000015158398,0.00001193422,0.00007428594,0.00006788145,0.0000047690733,0.000075277545,0.9561978,0.032529138,0.007165643,0.0021138643,0.0017371585],"study_design_scores_gemma":[0.00011919991,0.000011290059,0.000008907576,0.000020700652,0.000018211073,0.0000015659821,0.00011396876,0.7947966,0.18968827,0.000060507886,0.015016226,0.00014456428],"about_ca_topic_score_codex":0.00010901789,"about_ca_topic_score_gemma":0.00021540826,"teacher_disagreement_score":0.53926456,"about_ca_system_score_codex":0.00006216705,"about_ca_system_score_gemma":0.00002246924,"threshold_uncertainty_score":0.64090186},"labels":[],"label_agreement":null},{"id":"W3143052639","doi":"10.1109/mwc.017.2100187","title":"Empowering Prosumer Communities in Smart Grid with Wireless Communications and Federated Edge Learning","year":2021,"lang":"en","type":"article","venue":"IEEE Wireless Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prosumer; Computer science; Smart grid; Scalability; Renewable energy; Computer security; Distributed computing; Database","score_opus":0.025251263230110777,"score_gpt":0.2554096721745271,"score_spread":0.2301584089444163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143052639","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96836805,0.0044433214,0.004628626,0.0013845571,0.0003349093,0.00045135547,0.000022163213,0.0009106933,0.019456323],"genre_scores_gemma":[0.9861456,0.009393358,0.0032368007,0.000086135595,0.000029465562,0.0004049507,0.00034149594,0.00009990238,0.0002622981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982799,0.00043317644,0.00047815888,0.00021234044,0.00018864863,0.0004077355],"domain_scores_gemma":[0.9962536,0.00043227684,0.000080188634,0.002953307,0.00017611095,0.00010449173],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031589658,0.00030542215,0.000370177,0.00022049375,0.0008014685,0.00024708742,0.001171192,0.000111485926,0.000019680852],"category_scores_gemma":[0.00001352597,0.00034521194,0.000044132925,0.0007642187,0.0004347074,0.00034424374,0.0008351957,0.0009905568,0.000017762666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011783359,0.0025781784,0.3829114,0.0015175461,0.0023021747,0.00013405018,0.04706086,0.39196125,0.03569283,0.038721036,0.0037980278,0.09320481],"study_design_scores_gemma":[0.0018245067,0.000077148936,0.021634158,0.0010183508,0.00010666038,0.00008302115,0.014875452,0.8405072,0.0037759093,0.00007603989,0.1147364,0.0012851611],"about_ca_topic_score_codex":0.00052153954,"about_ca_topic_score_gemma":0.014406767,"teacher_disagreement_score":0.44854596,"about_ca_system_score_codex":0.00016518417,"about_ca_system_score_gemma":0.00006841368,"threshold_uncertainty_score":0.9999},"labels":[],"label_agreement":null},{"id":"W3144930484","doi":"10.1109/isgt49243.2021.9372260","title":"Including Demand Response and Battery Energy Storage Systems in Uniform Marginal Price Based Electricity Markets","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Software deployment; Renewable energy; Energy storage; Electric power system; Electricity market; Electricity; Environmental economics; Computer science; Business; Electrical engineering; Economics; Power (physics); Engineering","score_opus":0.009728694767861533,"score_gpt":0.19692079077233243,"score_spread":0.1871920960044709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144930484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83026826,0.0011035795,0.15608199,0.00017382164,0.0004107492,0.00009082553,0.0000024367416,0.00024350348,0.01162483],"genre_scores_gemma":[0.99797714,0.00010320748,0.0006095501,0.00015776,0.000057033394,0.000031464682,0.000007677965,0.000033056218,0.0010231071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998779,0.00017894551,0.00024940944,0.00025231324,0.00019205753,0.00034825047],"domain_scores_gemma":[0.99931604,0.00029867608,0.000023534567,0.00024750613,0.000029129551,0.000085119864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071549154,0.00018102404,0.00021021062,0.00030272963,0.00005058891,0.00007882585,0.00009653923,0.00007396966,0.000072824056],"category_scores_gemma":[0.00006232479,0.00019290208,0.000025572026,0.0005389815,0.000012128461,0.00014767089,0.000096852054,0.00012021664,0.0000035088137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002645067,0.00004895712,0.005732874,0.00029398836,0.00007407865,0.00067376415,0.00004737261,0.97569424,0.011144483,0.0013032397,0.0042015384,0.0005209657],"study_design_scores_gemma":[0.00066389545,0.000020810043,0.0762216,0.00007557405,0.000011510835,0.00002215763,0.00006431835,0.89331514,0.0050194305,0.000013441033,0.024286505,0.0002856044],"about_ca_topic_score_codex":0.00009367599,"about_ca_topic_score_gemma":0.00010179903,"teacher_disagreement_score":0.16770887,"about_ca_system_score_codex":0.00032197154,"about_ca_system_score_gemma":0.00003854862,"threshold_uncertainty_score":0.7866318},"labels":[],"label_agreement":null},{"id":"W3145843058","doi":"10.1109/ccwc51732.2021.9376009","title":"An open source SCADA for a solar water pumping system designed for Pakistani Conditions","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Memorial University of Newfoundland","keywords":"SCADA; Dashboard; Photovoltaic system; Arduino; Open source; Data logger; Voltage; Automotive engineering; Computer science; Environmental science; Real-time computing; Engineering; Electrical engineering; Embedded system; Operating system; Software","score_opus":0.01882057998922059,"score_gpt":0.25501662166685785,"score_spread":0.23619604167763725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145843058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034465324,0.000015855601,0.9607674,0.0001117787,0.00036509754,0.0008080144,0.000040752933,0.00053995586,0.0028858308],"genre_scores_gemma":[0.9749427,0.0000012527138,0.021796534,0.00016966452,0.00016877825,0.00068421557,0.00031468918,0.000080619146,0.001841579],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991389,0.000020987089,0.00021011398,0.00023146233,0.000075954595,0.00032257632],"domain_scores_gemma":[0.9994479,0.000057653182,0.000012314015,0.0003284327,0.00007815208,0.00007556141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022772413,0.00013342308,0.0001765246,0.000044304874,0.00018105176,0.00027412447,0.0002582534,0.000048864615,0.00010479206],"category_scores_gemma":[0.000007435251,0.000117046424,0.000055813904,0.000064292035,0.000007754324,0.0002455709,0.000082206854,0.000030876072,0.000024702795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030413355,0.000069914015,0.00004447474,0.0010922814,0.0004252454,0.00001654603,0.0005789564,0.77868265,0.16596887,0.03370306,0.019051306,0.00033629485],"study_design_scores_gemma":[0.0012198281,0.00007391582,0.000046283407,0.00007714525,0.00009410305,0.000009830411,0.0038099282,0.50963783,0.39356327,0.00022472642,0.09084802,0.0003951049],"about_ca_topic_score_codex":0.00004563744,"about_ca_topic_score_gemma":0.00008919852,"teacher_disagreement_score":0.9404774,"about_ca_system_score_codex":0.00012554541,"about_ca_system_score_gemma":0.000014105048,"threshold_uncertainty_score":0.47730148},"labels":[],"label_agreement":null},{"id":"W3148578637","doi":"10.1016/j.apenergy.2021.116833","title":"Deleterious effects of strategic, profit-seeking energy storage operation on electric power system costs","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Natural Science Foundation of China; National Key Research and Development Program of China; Carnegie Mellon University; National Science Foundation","keywords":"Energy storage; Peaking power plant; Electric power system; Environmental economics; Work (physics); Grid; Unintended consequences; Business; Profit (economics); Marginal cost; Industrial organization; Key (lock); Microeconomics; Power (physics); Risk analysis (engineering); Economics; Renewable energy; Computer science; Distributed generation; Engineering; Electrical engineering; Computer security","score_opus":0.005266929753041272,"score_gpt":0.17452161853958556,"score_spread":0.1692546887865443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148578637","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6612659,0.0012543647,0.1375375,0.00002072249,0.0021642495,0.00026247898,0.0000033272856,0.0011125873,0.19637889],"genre_scores_gemma":[0.9988809,0.0000993582,0.00022224587,0.00011674299,0.00016373296,0.00021222288,0.000052689033,0.00009321688,0.00015886218],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99851596,0.000051686864,0.0003459645,0.00036833703,0.00032502596,0.0003930301],"domain_scores_gemma":[0.99925125,0.00007423934,0.000065573615,0.00047404072,0.00004904841,0.00008587778],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007720725,0.0003029392,0.00034770503,0.0001899756,0.00006541465,0.000057702262,0.00017955879,0.00013809714,0.000019797673],"category_scores_gemma":[0.0000046462155,0.00032455646,0.000071787974,0.00043992957,0.000012850366,0.000060278708,0.000056933655,0.000106116684,0.000014249016],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000147462715,0.00003342897,0.0000030298984,0.00015214448,0.00012661172,0.00009112131,0.000028768589,0.45210007,0.21788768,0.3264496,0.00029982516,0.0028129558],"study_design_scores_gemma":[0.0009183163,0.00017065603,0.00013540935,0.00014117548,0.000058359452,0.000016063736,0.00012630121,0.1429354,0.84997886,0.00011997146,0.004834617,0.00056488614],"about_ca_topic_score_codex":0.00009627975,"about_ca_topic_score_gemma":0.00006237256,"teacher_disagreement_score":0.63209116,"about_ca_system_score_codex":0.00041235433,"about_ca_system_score_gemma":0.000037901613,"threshold_uncertainty_score":0.99992067},"labels":[],"label_agreement":null},{"id":"W3149068439","doi":"10.18280/ijsdp.160110","title":"Economic Planning of the Operation of PV-Connected Distribution Network Using a Probabilistic Model for Extending the Network Lifetime","year":2021,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Probabilistic logic; Battery (electricity); Photovoltaic system; Power (physics); Reliability engineering; Gaussian; Computer science; Voltage; Automotive engineering; Mathematical optimization; Engineering; Electrical engineering; Mathematics","score_opus":0.015703089086014154,"score_gpt":0.23695408025431364,"score_spread":0.2212509911682995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149068439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7191104,0.00072794675,0.27922517,0.00007036317,0.0006505475,0.00011973332,0.000004092304,0.0000068684903,0.000084854866],"genre_scores_gemma":[0.9922514,0.00001968484,0.007248697,0.000018359577,0.00035242474,0.0000067005712,0.000025787085,0.000011487388,0.00006543999],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905765,0.000026719124,0.00048591237,0.00007712718,0.00017032422,0.00018228157],"domain_scores_gemma":[0.99919015,0.00015284971,0.00024428798,0.00006132517,0.00032817948,0.000023179202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000576272,0.000096040974,0.00015774881,0.000041873027,0.00013679916,0.000058608934,0.00018434813,0.000035132794,0.0000042374445],"category_scores_gemma":[0.00010476935,0.0000727691,0.000050264312,0.000095333045,0.000022157628,0.00017073614,0.000093218376,0.000098013654,5.3380873e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045291632,0.000006057383,0.003818174,0.00005765428,0.0002240866,0.000018560364,0.0010634062,0.98934466,0.00007277281,0.0044763233,0.0005930871,0.0002799071],"study_design_scores_gemma":[0.00033318502,0.000008974325,0.008210157,0.0003782334,0.000039987604,0.00003095285,0.0015365429,0.98590446,0.0007823103,0.0010704545,0.001616624,0.000088112436],"about_ca_topic_score_codex":0.000003039495,"about_ca_topic_score_gemma":0.0000017769513,"teacher_disagreement_score":0.273141,"about_ca_system_score_codex":0.0002639015,"about_ca_system_score_gemma":0.00019821743,"threshold_uncertainty_score":0.29674378},"labels":[],"label_agreement":null},{"id":"W3150436106","doi":"","title":"Active power regulation of wind power systems through demand response","year":2012,"lang":"en","type":"article","venue":"中国科学:技术科学(英文版)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Wind power; Electric power system; Demand response; Renewable energy; Production (economics); Environmental economics; Power (physics); Computer science; Economics; Electricity; Engineering; Microeconomics; Electrical engineering","score_opus":0.009627678434239357,"score_gpt":0.21177339695519112,"score_spread":0.20214571852095176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3150436106","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92587805,0.0011170347,0.009081087,0.000082143735,0.0031174317,0.0003995808,0.000019296518,0.00029624303,0.06000911],"genre_scores_gemma":[0.9979377,0.000018674053,0.00035348418,0.00003563046,0.0001758,0.000025363817,0.000014162759,0.00007612184,0.0013631112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99840546,0.0001373575,0.00039363198,0.0002234492,0.00038199796,0.00045813064],"domain_scores_gemma":[0.9989663,0.00015364596,0.00010892442,0.00059547863,0.00007093862,0.00010474268],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00054669863,0.00026430155,0.0003164216,0.00015307066,0.00006029099,0.000030560426,0.00018936532,0.00016095823,0.00027946],"category_scores_gemma":[0.00007759585,0.00026387317,0.00009399302,0.00029739513,0.000051288655,0.0006035176,0.00008168807,0.00014703668,0.00016116581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015439473,0.00037445867,0.007861973,0.00044038787,0.0012777327,0.00002280153,0.020690914,0.8141069,0.049476307,0.023031205,0.08056172,0.00061166735],"study_design_scores_gemma":[0.0019321308,0.00027157128,0.46456638,0.00032693846,0.00018996386,0.000022804832,0.0037897762,0.010905983,0.036692083,0.00020474826,0.4799086,0.0011890383],"about_ca_topic_score_codex":0.00006522773,"about_ca_topic_score_gemma":0.0000059051467,"teacher_disagreement_score":0.8032009,"about_ca_system_score_codex":0.0002100021,"about_ca_system_score_gemma":0.000014899459,"threshold_uncertainty_score":0.99998134},"labels":[],"label_agreement":null},{"id":"W3154725632","doi":"10.3390/jrfm14060235","title":"A Computational Approach to Sequential Decision Optimization in Energy Storage and Trading","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Peaking power plant; Battery (electricity); Computer science; Load shifting; Energy storage; Stochastic programming; Demand response; Energy management; Battery storage; Mathematical optimization; Operations research; Power (physics); Electricity generation; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.006663842815768158,"score_gpt":0.18913665065400456,"score_spread":0.1824728078382364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154725632","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07963152,0.00056243077,0.9186446,0.000014797518,0.00031940703,0.000040632938,0.0000016796961,0.00000931758,0.00077558466],"genre_scores_gemma":[0.8764514,0.0016172713,0.12172855,0.000051329553,0.00011971359,0.0000037612883,0.0000034669702,0.000011071906,0.000013476786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993029,0.000024140922,0.0002729909,0.00011213652,0.00017706721,0.00011074869],"domain_scores_gemma":[0.99977505,0.000032606986,0.000046251338,0.000053859723,0.00003198967,0.000060259983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021544361,0.000089284076,0.00015380497,0.00028391366,0.000040725747,0.00005084802,0.00005166542,0.000030165082,0.0000044992867],"category_scores_gemma":[0.000025548141,0.00009289734,0.000028555984,0.0002636238,0.000008565363,0.00011608391,0.0000619596,0.00008142867,2.1061678e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021408277,0.000031685715,0.00033860042,0.000024797755,0.000014522361,0.00007252078,0.00018551027,0.9256048,0.0000026456698,0.0034628885,0.00040380232,0.06983679],"study_design_scores_gemma":[0.0009022599,0.00003366168,0.020147523,0.00007472785,0.000038810063,0.00002372037,0.00014240143,0.96493,0.000013527517,0.0016249688,0.011936085,0.00013229364],"about_ca_topic_score_codex":0.000005697086,"about_ca_topic_score_gemma":0.000008817537,"teacher_disagreement_score":0.79691607,"about_ca_system_score_codex":0.00006794102,"about_ca_system_score_gemma":0.000008107421,"threshold_uncertainty_score":0.37882435},"labels":[],"label_agreement":null},{"id":"W3154954407","doi":"10.3390/sym13040647","title":"Modelling of Consumption Shares for Small Wind Energy Prosumers","year":2021,"lang":"en","type":"article","venue":"Symmetry","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"European Regional Development Fund; Norway Grants; Teadmistepõhise Ehituse Tippkeskus ZEBE; Eesti Teadusagentuur","keywords":"Wind power; Electricity; Production (economics); Renewable energy; Consumption (sociology); Computer science; Grid; Generator (circuit theory); Environmental science; Energy consumption; Environmental economics; Automotive engineering; Electrical engineering; Economics; Mathematics; Engineering; Microeconomics; Power (physics); Physics","score_opus":0.03724201932951195,"score_gpt":0.21115437090019043,"score_spread":0.17391235157067847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154954407","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30885208,0.0022148853,0.68400115,0.000030843465,0.0008777608,0.00010850935,0.00002947465,0.0001833779,0.003701921],"genre_scores_gemma":[0.988514,0.00016970368,0.010639476,0.000032842407,0.00010098923,0.000022412556,0.000060755916,0.000034514233,0.0004252995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994545,0.0000082634615,0.00016215093,0.00013593957,0.00008130398,0.00015784442],"domain_scores_gemma":[0.99968445,0.000042041996,0.000021485666,0.00017637125,0.00004428001,0.000031390937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000062461026,0.000089867484,0.00012429195,0.00007738873,0.000020287946,0.0000125680535,0.00007003183,0.000049459177,0.000034612993],"category_scores_gemma":[0.0000120589,0.00010304708,0.000061095074,0.00011462938,0.000012522516,0.000044752625,0.000028907025,0.00003655207,0.000004100406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004773334,0.000014396459,0.0007382598,0.0002722776,0.000091420174,0.0000025099127,0.00002571452,0.98541796,0.0013382225,0.008188321,0.00086718524,0.0030389354],"study_design_scores_gemma":[0.0003406988,0.000014067732,0.00033738904,0.00006117903,0.00003897499,0.000001634485,0.00003658592,0.8949904,0.08421721,0.0005588071,0.019233637,0.00016943224],"about_ca_topic_score_codex":0.00001893242,"about_ca_topic_score_gemma":0.000014309371,"teacher_disagreement_score":0.6796619,"about_ca_system_score_codex":0.00003463925,"about_ca_system_score_gemma":0.000009413977,"threshold_uncertainty_score":0.4202138},"labels":[],"label_agreement":null},{"id":"W3157616196","doi":"10.18280/mmep.080201","title":"Optimal Location of Sectionners and Distributed Generation Resources to Improve Reliability in Distribution Networks","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blackout; Reliability (semiconductor); Downstream (manufacturing); Distribution (mathematics); Reliability engineering; Computer science; Power (physics); Distributed generation; Upstream (networking); Distributed computing; Engineering; Computer network; Electric power system; Operations management","score_opus":0.009619036762110929,"score_gpt":0.17973820397471177,"score_spread":0.17011916721260084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157616196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.422279,0.00014623372,0.57735157,0.000026532338,0.00005555585,0.00007308724,0.0000029353976,0.000056480014,0.000008592048],"genre_scores_gemma":[0.9848903,0.00006291686,0.014888356,0.000002192203,0.000046395027,0.000043073247,0.000044040215,0.000015912532,0.000006805426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928725,0.000010321639,0.00027790212,0.00018019248,0.00008571586,0.00015862925],"domain_scores_gemma":[0.9996958,0.00004249931,0.00001562612,0.00013002112,0.000053923057,0.00006214291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022825734,0.00011272599,0.00016191445,0.00004210928,0.00002236262,0.00003348613,0.000029643767,0.00006732127,0.0000014018582],"category_scores_gemma":[0.000058179445,0.00011935582,0.000014025691,0.00028749238,0.000012525659,0.000065461834,0.000032452066,0.00010092789,4.0500828e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019074407,0.000016689444,0.000042074844,0.00049794384,0.000010282662,5.4772283e-7,0.00019975052,0.9971935,0.0008268894,0.0010289223,0.000012085847,0.00016941545],"study_design_scores_gemma":[0.00012066282,0.000017014412,0.00027247838,0.00015034318,0.000011339639,0.000002352857,0.000028451235,0.9981843,0.0007956513,0.00021154335,0.00008906111,0.00011678468],"about_ca_topic_score_codex":0.000011642639,"about_ca_topic_score_gemma":0.000002880664,"teacher_disagreement_score":0.5626113,"about_ca_system_score_codex":0.000057873665,"about_ca_system_score_gemma":0.000003419934,"threshold_uncertainty_score":0.4867189},"labels":[],"label_agreement":null},{"id":"W3157915181","doi":"","title":"Bilevel models for demand response in smart grids","year":2020,"lang":"en","type":"preprint","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bilevel optimization; Mathematical optimization; Demand response; Leverage (statistics); Computer science; Optimization problem; Flexibility (engineering); Anticipation (artificial intelligence); Smart grid; Electricity; Mathematics; Engineering","score_opus":0.02089551195150685,"score_gpt":0.22808174209612192,"score_spread":0.20718623014461507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157915181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049366016,0.0017519422,0.93873984,0.0033202446,0.00092915137,0.0024191404,0.00029419226,0.0024988106,0.0006806953],"genre_scores_gemma":[0.8654217,0.0006674319,0.12439845,0.0011782331,0.00043405994,0.0069118026,0.00021027944,0.00041178058,0.0003662361],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99623233,0.00019692013,0.0010041066,0.0009900997,0.00044298405,0.0011335756],"domain_scores_gemma":[0.99751914,0.000311245,0.0001698354,0.0015074004,0.00009133126,0.0004010507],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014140521,0.000888469,0.0009623146,0.0010946402,0.00009915471,0.00024158496,0.00113323,0.00089571055,0.000016590804],"category_scores_gemma":[0.00027456504,0.0010490954,0.00040084412,0.0005532919,0.000061137194,0.0002659011,0.0010836588,0.0012346278,0.000015042516],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060421793,0.00007442383,0.00074504205,0.0004765845,0.0001597437,0.00008415719,0.0002584813,0.9773729,0.0015088347,0.005049178,0.0122717405,0.0013946891],"study_design_scores_gemma":[0.000782475,0.00010792447,0.008559116,0.0002413923,0.00007222245,0.000011099137,0.000033280212,0.9580047,0.0029186911,0.022136576,0.0061487425,0.0009837567],"about_ca_topic_score_codex":0.0018045325,"about_ca_topic_score_gemma":0.0015138406,"teacher_disagreement_score":0.8160557,"about_ca_system_score_codex":0.0015175989,"about_ca_system_score_gemma":0.00027073885,"threshold_uncertainty_score":0.99919593},"labels":[],"label_agreement":null},{"id":"W3158065780","doi":"10.1109/access.2021.3078082","title":"Multi-Level Energy Management Systems Toward a Smarter Grid: A Review","year":2021,"lang":"en","type":"review","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Energy management; Computer science; Energy management system; Renewable energy; News aggregator; Electric power system; Grid; Management system; Maximization; Smart grid; Electricity; Risk analysis (engineering); Distributed computing; Energy (signal processing); Mathematical optimization; Operations management; Power (physics); Engineering; Business","score_opus":0.15499501936530302,"score_gpt":0.3439599406523228,"score_spread":0.1889649212870198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158065780","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.6158635e-8,0.9505668,0.03205154,0.00001598645,0.011458024,0.0010476433,0.00008799909,0.0005382527,0.0042336807],"genre_scores_gemma":[0.000001338318,0.9918598,0.00062655343,0.00026817838,0.001232983,0.0029725116,0.00040087386,0.0002971303,0.0023406434],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963183,0.00020898988,0.0013174579,0.0008702863,0.00056177215,0.0007232106],"domain_scores_gemma":[0.9978651,0.000066237364,0.00025292247,0.0015399467,0.0000797564,0.00019606168],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034126037,0.0010324052,0.0029092652,0.0004199968,0.00005835486,0.00041355958,0.0017844056,0.0002976234,0.00014563398],"category_scores_gemma":[0.000010684307,0.000935173,0.0007755755,0.0010113803,0.000025288375,0.00029660843,0.0005330453,0.00037641986,0.00023852165],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.520307e-7,0.000035878027,2.3323625e-7,0.24662688,0.0014017255,0.00037036499,0.0000044116096,0.0026727745,3.0691996e-8,0.00023191657,0.19930254,0.549353],"study_design_scores_gemma":[0.00015602697,0.00000495682,0.0000020497287,0.11202993,0.0017512423,0.000043131957,0.000003129198,0.00081555743,5.3727126e-7,9.608929e-7,0.8843439,0.00084853254],"about_ca_topic_score_codex":0.00008233402,"about_ca_topic_score_gemma":0.000023975417,"teacher_disagreement_score":0.6850414,"about_ca_system_score_codex":0.00046655192,"about_ca_system_score_gemma":0.000048334874,"threshold_uncertainty_score":0.9993099},"labels":[],"label_agreement":null},{"id":"W3158336473","doi":"10.82308/31695","title":"Electricity market-clearing with stochastic security","year":2006,"lang":"en","type":"book","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Fonds Québécois de la Recherche sur la Nature et les Technologies","keywords":"Clearing; Market clearing; Electricity market; Electricity; Business; Computer science; Economics; Engineering; Electrical engineering; Microeconomics; Finance","score_opus":0.005979974826949912,"score_gpt":0.16778491815571928,"score_spread":0.16180494332876935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158336473","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013287703,0.00031702954,0.000051345418,0.0000051762477,0.0010709271,0.00085732515,0.00046854682,0.002296488,0.98164546],"genre_scores_gemma":[0.50298244,0.00012522303,0.00083296275,0.00019935604,0.00051399664,0.0002818639,0.0004080587,0.001358741,0.49329737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99491185,0.00014075174,0.000913818,0.0013211516,0.001253995,0.0014584218],"domain_scores_gemma":[0.9974423,0.0002591613,0.00028263096,0.0014104907,0.00019271455,0.0004126892],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.000705881,0.0014757527,0.0011477434,0.00076069555,0.00062481203,0.00014936252,0.0010244541,0.00088778103,0.00041651755],"category_scores_gemma":[0.00010706535,0.0016095518,0.00035356125,0.00060772843,0.000116560645,0.00058419927,0.00041095683,0.0027901523,0.00044841325],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041209997,0.00044373027,0.000025621917,0.0031513318,0.0038009195,0.0014429721,0.000006997512,0.69580716,0.0009944213,0.21777338,0.020668807,0.055472586],"study_design_scores_gemma":[0.0015408214,0.00025218975,0.0002740206,0.0008919377,0.0007040036,0.00010820065,0.000005820975,0.012477842,0.0012473849,0.024901973,0.954075,0.0035208303],"about_ca_topic_score_codex":0.0001466967,"about_ca_topic_score_gemma":0.0006643572,"teacher_disagreement_score":0.9334062,"about_ca_system_score_codex":0.0035067133,"about_ca_system_score_gemma":0.000058905152,"threshold_uncertainty_score":0.9997992},"labels":[],"label_agreement":null},{"id":"W3159219221","doi":"10.1109/pesgm46819.2021.9638038","title":"Domestic Battery Power Management Strategies to Maximize the Profitability and Support the Network","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Interreg; Queen's University; Queen's University Belfast; European Commission","keywords":"Computer science; Electrification; Profitability index; Software deployment; Electricity; Scheduling (production processes); Demand response; Operations research; Engineering; Operations management; Economics; Electrical engineering; Finance","score_opus":0.010399258728217842,"score_gpt":0.22409384008308514,"score_spread":0.2136945813548673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3159219221","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7308893,0.005506672,0.13374855,0.014874827,0.016342381,0.0013412978,0.00004969917,0.0011844782,0.09606278],"genre_scores_gemma":[0.94134617,0.0012840537,0.03221026,0.0066439803,0.0018704149,0.0006043895,0.000099821016,0.0002512962,0.015689604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964189,0.00030670362,0.00065582624,0.0008482723,0.0006569532,0.0011133305],"domain_scores_gemma":[0.9978533,0.00027373363,0.00009655995,0.0014185265,0.00014047045,0.0002174587],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013571151,0.0006057174,0.00046494562,0.00003289938,0.00057687395,0.0005153265,0.00061971246,0.00016756324,0.00046603975],"category_scores_gemma":[0.000046127418,0.00044959536,0.00037596107,0.0008033542,0.000185599,0.00018506782,0.00061503967,0.00040589875,0.00006924105],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012100828,0.000043403,0.00038894833,0.00008078593,0.00071703515,0.00003099299,0.0018793865,0.81737727,0.0011910838,0.0032176757,0.17430986,0.0007514718],"study_design_scores_gemma":[0.00078613445,0.00005673544,0.0067749405,0.00015163161,0.00033512185,0.00006149108,0.0030631342,0.009072534,0.0010434823,0.0019511158,0.97531414,0.0013895315],"about_ca_topic_score_codex":0.000075098375,"about_ca_topic_score_gemma":0.00030098174,"teacher_disagreement_score":0.8083047,"about_ca_system_score_codex":0.00021000754,"about_ca_system_score_gemma":0.00006767823,"threshold_uncertainty_score":0.99979556},"labels":[],"label_agreement":null},{"id":"W3160179685","doi":"10.1049/gtd2.12205","title":"Value‐stack aggregator optimal planning considering disparate DERs technologies","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Computer science; Value proposition; Capacity planning; Energy planning; Environmental economics; Business; Renewable energy; Economics; Engineering; Finance; Marketing","score_opus":0.019013116041665355,"score_gpt":0.22964733938292126,"score_spread":0.2106342233412559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160179685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19537297,0.0019488423,0.7998125,0.0006516197,0.0006016955,0.00013036684,0.00004175267,0.0011403508,0.0002999274],"genre_scores_gemma":[0.9913759,0.00052509987,0.006413556,0.00004331945,0.00013983482,0.000057438785,0.0013076469,0.000036360463,0.00010080294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986427,0.000047846897,0.00035242437,0.00034488176,0.0002660617,0.00034612193],"domain_scores_gemma":[0.9994792,0.000024435572,0.000044710432,0.00028218687,0.00008038557,0.00008908082],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012936238,0.0002460615,0.00019539545,0.00006397293,0.00022653751,0.00014336835,0.000113178605,0.00016774522,0.000084543426],"category_scores_gemma":[0.000039584655,0.0002626247,0.00008922342,0.00034760154,0.000042420703,0.0002734674,0.000029990426,0.00018814509,0.000026940996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070771966,0.000017996661,0.00009877166,0.00004687755,0.000048747235,0.00004105846,0.00006847466,0.8893692,0.08958704,0.001212856,0.012210729,0.007291166],"study_design_scores_gemma":[0.00033986513,0.000014636893,0.0002805249,0.000066637214,0.000032492204,0.000013292645,0.00017657342,0.507238,0.4157795,0.000065075,0.07573411,0.000259313],"about_ca_topic_score_codex":0.0000029124792,"about_ca_topic_score_gemma":0.000001986776,"teacher_disagreement_score":0.796003,"about_ca_system_score_codex":0.00017748478,"about_ca_system_score_gemma":0.00004562,"threshold_uncertainty_score":0.9999826},"labels":[],"label_agreement":null},{"id":"W3160258797","doi":"10.1109/tsg.2021.3078695","title":"TraceGAN: Synthesizing Appliance Power Signatures Using Generative Adversarial Networks","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bottleneck; Computer science; Generator (circuit theory); Smart meter; Discriminative model; Generative grammar; Generative adversarial network; Data mining; Adversarial system; Electricity; Conditional random field; Power (physics); Machine learning; Data collection; Artificial intelligence; Engineering; Deep learning; Embedded system","score_opus":0.013020666082572267,"score_gpt":0.21087801055025812,"score_spread":0.19785734446768585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160258797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019335028,0.00046465133,0.9668553,0.00008392087,0.010447985,0.00018487404,0.000027881306,0.0004574245,0.0021429777],"genre_scores_gemma":[0.9923318,0.00014501302,0.0059270742,0.00023560497,0.00088473776,0.00006201786,0.000007973422,0.000097105956,0.0003086948],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984997,0.00006827584,0.00029883627,0.0004081733,0.0002760701,0.0004489695],"domain_scores_gemma":[0.999258,0.00011321674,0.00003431166,0.00041539792,0.00006147664,0.000117628064],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011783149,0.000327899,0.00028661004,0.00012850216,0.00025531897,0.00008628705,0.00016126309,0.00018413243,0.00035535308],"category_scores_gemma":[0.0000041155517,0.00037073143,0.000184026,0.00045029307,0.000045453886,0.0002203176,0.0000026003295,0.0004970256,0.000046771984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024609815,0.00005944771,0.0000037070017,0.000016653063,0.00021621594,0.00006192474,0.000105841136,0.98616403,0.0100337975,0.000059679547,0.0015928395,0.0016612445],"study_design_scores_gemma":[0.0006076764,0.000036066696,0.00008433362,0.00009283693,0.00014342667,0.000022820597,0.00017121492,0.7960482,0.17812315,0.000016536429,0.024024205,0.00062952813],"about_ca_topic_score_codex":0.000017812064,"about_ca_topic_score_gemma":0.000086290085,"teacher_disagreement_score":0.9729968,"about_ca_system_score_codex":0.00021439116,"about_ca_system_score_gemma":0.000035609923,"threshold_uncertainty_score":0.9998745},"labels":[],"label_agreement":null},{"id":"W3163233944","doi":"10.48550/arxiv.2105.08122","title":"A Data-Efficient Approach to Behind-the-Meter Solar Generation Disaggregation","year":2021,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Photovoltaic system; Smart meter; Software deployment; AKA; Proxy (statistics); Cost of electricity by source; Computer science; Metre; Solar energy; Environmental science; Real-time computing; Electricity generation; Smart grid; Engineering; Electrical engineering","score_opus":0.11848980343020377,"score_gpt":0.17793475894432753,"score_spread":0.059444955514123765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163233944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33939433,0.00007424036,0.65609396,0.000040217456,0.0011078696,0.0003489893,0.000045183762,0.00021358376,0.0026816034],"genre_scores_gemma":[0.9956812,0.000078679026,0.0017835837,0.000075307355,0.0003986853,0.0000072589746,0.0013045676,0.00005042582,0.0006202825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838984,0.00009134281,0.00019995082,0.0008945138,0.00013499362,0.0002893416],"domain_scores_gemma":[0.99774003,0.000025498,0.000065851025,0.001989143,0.00006894538,0.000110509354],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028724686,0.00030526516,0.00023292437,0.0001887761,0.00013095577,0.00018572662,0.0010540979,0.00017447342,0.000029862684],"category_scores_gemma":[0.000025106008,0.00032065657,0.00010537149,0.0003458952,0.000033849075,0.00016366379,0.001803568,0.00038325525,0.000054304273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036982115,0.00005450981,0.00007239037,0.000063471954,0.00017558421,0.000023456128,0.00026117783,0.9946287,0.00012375905,0.001333455,0.0029693064,0.00029043516],"study_design_scores_gemma":[0.00014384332,0.0000065030786,0.00035591607,0.000031506643,0.00017291318,0.000001376883,0.00016925608,0.9942306,0.0003062109,0.00003946962,0.0041919705,0.00035040046],"about_ca_topic_score_codex":0.00007284536,"about_ca_topic_score_gemma":0.00014692344,"teacher_disagreement_score":0.6562869,"about_ca_system_score_codex":0.00031882158,"about_ca_system_score_gemma":0.000037224145,"threshold_uncertainty_score":0.99992454},"labels":[],"label_agreement":null},{"id":"W3164357312","doi":"10.1049/gtd2.12187","title":"Optimal operation of small, numerous, and disparate DERs via aggregation in transactive distribution systems with universal metering","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Metering mode; Computer science; Distributed computing; Engineering","score_opus":0.009449446107565538,"score_gpt":0.1855467616918588,"score_spread":0.17609731558429326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3164357312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3919095,0.00035059056,0.60718554,0.000073842006,0.00013153178,0.00018971629,0.00008291726,0.000058301757,0.000018028915],"genre_scores_gemma":[0.9933381,0.00051914406,0.0015521338,0.000004334207,0.000052595096,0.00004876859,0.0044428427,0.000023345592,0.000018737019],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987083,0.0001217869,0.0003979103,0.00031980916,0.00023237243,0.00021983571],"domain_scores_gemma":[0.9995577,0.000020246878,0.00006795373,0.00015362834,0.00011303585,0.00008744887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001801882,0.00022268046,0.00024003614,0.000066469736,0.000107425665,0.000079148725,0.00005726518,0.00012698637,0.000017291986],"category_scores_gemma":[0.0000055204764,0.00022605859,0.000041970252,0.00037384237,0.000038427344,0.00045682857,0.000007647653,0.00012801868,0.0000012934295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000068199086,0.000049143167,0.00018520547,0.00011310802,0.000051347753,0.000010710214,0.0002128686,0.92099166,0.06996122,0.00047625258,0.000053577856,0.007826681],"study_design_scores_gemma":[0.0009721866,0.00007347957,0.0028095187,0.000115288756,0.000061668965,0.000014598013,0.00019689831,0.809645,0.18487519,0.0000056168883,0.0010058136,0.00022475311],"about_ca_topic_score_codex":0.000083236104,"about_ca_topic_score_gemma":0.000094267656,"teacher_disagreement_score":0.60563344,"about_ca_system_score_codex":0.00028447254,"about_ca_system_score_gemma":0.000044488388,"threshold_uncertainty_score":0.92184013},"labels":[],"label_agreement":null},{"id":"W3164739391","doi":"10.1049/gtd2.12182","title":"Comprehensive platform for distribution transactive energy markets","year":2021,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Transactive memory; Computer science; Business; Distributed computing; Environmental economics; Knowledge management; Economics","score_opus":0.019053916717710163,"score_gpt":0.2205824761353535,"score_spread":0.20152855941764333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3164739391","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017025886,0.00079370703,0.9786581,0.00041590133,0.0009860209,0.0002596202,0.0011880744,0.00036115563,0.00031156465],"genre_scores_gemma":[0.956597,0.000819074,0.0013038464,0.00010182142,0.00041447446,0.00024884165,0.040192857,0.000047376532,0.00027471123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99837893,0.00005785878,0.0004421756,0.00041544414,0.00031442713,0.0003911726],"domain_scores_gemma":[0.9991465,0.000062889936,0.000049966085,0.0002534748,0.0003208429,0.00016627963],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011665675,0.00030738075,0.00026089046,0.00004120305,0.0002827336,0.00009525871,0.00010706571,0.00020555382,0.00018684287],"category_scores_gemma":[0.000013621611,0.00033469236,0.0002086274,0.00033647462,0.00003133243,0.00032983476,0.000009375825,0.000121153564,0.00000865329],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023742746,0.0002628847,0.000014006928,0.0003167308,0.00034363195,0.000023470466,0.00016726766,0.3809998,0.26148802,0.022807157,0.13692439,0.19641523],"study_design_scores_gemma":[0.0007850211,0.00003071837,0.00049297215,0.00002291503,0.00005521826,0.0000070923916,0.00004076254,0.2941824,0.28135744,0.0002401285,0.42252797,0.00025737035],"about_ca_topic_score_codex":0.000007498332,"about_ca_topic_score_gemma":0.000012351059,"teacher_disagreement_score":0.9773542,"about_ca_system_score_codex":0.00035652146,"about_ca_system_score_gemma":0.00005695016,"threshold_uncertainty_score":0.99991053},"labels":[],"label_agreement":null},{"id":"W3165380363","doi":"10.11575/prism/35998","title":"Impact Of Demand Side Management On The Residential Electricity Use In The City Of Calgary","year":2017,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand side; Electricity; Business; Electricity demand; Demand management; Operations management; Environmental planning; Natural resource economics; Environmental economics; Geography; Economics; Engineering; Electricity generation; Power (physics)","score_opus":0.014454111464222269,"score_gpt":0.20241883245414327,"score_spread":0.187964720989921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165380363","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9504094,0.000029688636,0.029353742,0.00010223946,0.00006780281,0.0002655803,6.07079e-7,0.000019941059,0.01975097],"genre_scores_gemma":[0.9986227,0.00014941295,0.0009495928,0.000011284381,0.000007883452,6.8416466e-7,0.0000021274082,0.000009130226,0.00024716448],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99911165,0.00008273523,0.00015296273,0.0001422073,0.00031578675,0.00019467197],"domain_scores_gemma":[0.9989024,0.00012187561,0.0001452708,0.00077204127,0.000027402086,0.000031035328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003959628,0.00012588614,0.00021479971,0.00017028082,0.00013901258,0.00001843589,0.0008423647,0.000057957935,0.000041472045],"category_scores_gemma":[0.00003942875,0.00010039313,0.00015914915,0.0001317693,0.00013955058,0.00019638873,0.0002224425,0.00017350158,0.0000029500657],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024657848,0.0020421694,0.65167785,0.0014103935,0.00602136,0.0012889993,0.009604959,0.037440874,0.0077311695,0.08561166,0.05260033,0.14210446],"study_design_scores_gemma":[0.00051621953,0.000072942996,0.9583512,0.000041292496,0.00007454215,6.145672e-7,0.000033493823,0.03956305,0.0006244115,0.00031403892,0.00031137577,0.00009681436],"about_ca_topic_score_codex":0.007108342,"about_ca_topic_score_gemma":0.00034349758,"teacher_disagreement_score":0.30667335,"about_ca_system_score_codex":0.0000887648,"about_ca_system_score_gemma":0.00001241001,"threshold_uncertainty_score":0.99950343},"labels":[],"label_agreement":null},{"id":"W3165461565","doi":"10.1109/mim.2021.9436092","title":"An Overview of IoT-Enabled Monitoring and Control Systems for Electric Vehicles","year":2021,"lang":"en","type":"article","venue":"IEEE Instrumentation & Measurement Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Internet of Things; Pace; Smart city; Battery (electricity); Wireless sensor network; Computer science; Cloud computing; Efficient energy use; Electric vehicle; Smart grid; Computer security; Systems engineering; Telecommunications; Engineering; Computer network; Electrical engineering","score_opus":0.051642082920377266,"score_gpt":0.2667346750215015,"score_spread":0.21509259210112425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165461565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.963727,0.009291464,0.023646738,0.000077730394,0.0019412575,0.00076893833,0.000017007413,0.00021437951,0.00031550182],"genre_scores_gemma":[0.99776214,0.0010183597,0.0006955376,0.000020653983,0.00023235676,0.00019156437,0.000011989149,0.000038862974,0.000028503657],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985709,0.00006277791,0.00042840524,0.00022664196,0.00046849877,0.00024275156],"domain_scores_gemma":[0.9992819,0.000030398498,0.00008762443,0.00023027709,0.00029168866,0.00007811348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004541269,0.00018035599,0.0002748329,0.00013265286,0.000056205918,0.00007231039,0.00008909881,0.000047615886,0.000008663832],"category_scores_gemma":[0.000024767593,0.00020035512,0.000048151876,0.0002584443,0.000011295556,0.00019130619,0.000007623965,0.000059503946,0.0000044117223],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028463643,0.00005984222,0.0047387024,0.00076160795,0.00019799595,0.0000027039882,0.000058991933,0.17444912,0.812473,0.00028646892,0.00042512856,0.00651799],"study_design_scores_gemma":[0.0055937055,0.00026331522,0.050610207,0.0004031782,0.00032573723,0.00001000921,0.00023741277,0.2434537,0.6930209,0.00011042605,0.005477741,0.00049369497],"about_ca_topic_score_codex":0.0000142096915,"about_ca_topic_score_gemma":0.000010100752,"teacher_disagreement_score":0.119452104,"about_ca_system_score_codex":0.0002098024,"about_ca_system_score_gemma":0.00003111902,"threshold_uncertainty_score":0.81702447},"labels":[],"label_agreement":null},{"id":"W3167076394","doi":"10.82308/39049","title":"Quantification of ancillary service provision by microgrid","year":2016,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Service (business); Business; Computer science; Marketing","score_opus":0.011667864848430451,"score_gpt":0.19430994528952192,"score_spread":0.18264208044109148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167076394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9870887,0.00042632333,0.00006511714,0.000112987036,0.00075446564,0.00038008235,0.00049585634,0.0006783527,0.009998134],"genre_scores_gemma":[0.99764156,0.00044582793,0.0011193627,0.00015868107,0.000035116776,0.000060057206,0.000055060125,0.000120533194,0.00036377588],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9978799,0.00009338533,0.0005987717,0.00049754244,0.00044990508,0.00048046856],"domain_scores_gemma":[0.99859315,0.0001139556,0.00014099953,0.00078357646,0.00020103379,0.00016727108],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005245208,0.0003482479,0.00031810245,0.00018792793,0.00018198797,0.000022785574,0.00048432016,0.00019304921,0.00010962696],"category_scores_gemma":[0.00008868984,0.0003002248,0.00010948194,0.00052887126,0.000040987255,0.00065766636,0.00016450718,0.00020045627,0.00038234843],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021039348,0.00006645884,0.00008588599,0.00017040668,0.000077949495,0.0000042198885,0.0000014010271,0.0014904354,0.831267,0.0067330315,0.00021623365,0.15986593],"study_design_scores_gemma":[0.0005718086,0.000047073794,0.0010212415,0.0001447532,0.000035801135,0.00000556978,0.000011785198,0.0004492761,0.65198314,0.00062000484,0.3447099,0.00039968084],"about_ca_topic_score_codex":0.00007775884,"about_ca_topic_score_gemma":0.000083361345,"teacher_disagreement_score":0.34449366,"about_ca_system_score_codex":0.00037157122,"about_ca_system_score_gemma":0.000007603799,"threshold_uncertainty_score":0.999945},"labels":[],"label_agreement":null},{"id":"W3167386905","doi":"10.4018/978-1-7998-8335-7.ch011","title":"Optimizing the Power Consumption of Household Appliances Using IoT","year":2021,"lang":"en","type":"book-chapter","venue":"Advances in environmental engineering and green technologies book series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Schedule; MATLAB; Power consumption; Computer science; Consumption (sociology); Internet of Things; Controller (irrigation); Power (physics); Power demand; Simulation; Embedded system; Automotive engineering; Real-time computing; Reliability engineering; Engineering; Operating system","score_opus":0.008614522112877629,"score_gpt":0.17501198334861717,"score_spread":0.16639746123573954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167386905","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03522286,0.9261966,0.008013559,0.00014316294,0.0015324636,0.0011082443,0.00021751602,0.0028553412,0.024710251],"genre_scores_gemma":[0.3545015,0.6047026,0.022891931,0.000043529097,0.0001193032,0.00017207097,0.000058070218,0.00046056774,0.017050466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892354,0.0000033627175,0.00034352465,0.00029990866,0.00017786477,0.00025179063],"domain_scores_gemma":[0.99944144,0.000043446566,0.000086660824,0.0004075602,0.000002482404,0.000018398194],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005848621,0.0003999114,0.000396666,0.00017188855,0.000048130347,0.000017025193,0.00024705843,0.00024735794,0.000024012166],"category_scores_gemma":[0.000004680854,0.00037264277,0.000064177504,0.000039528994,0.00040467264,0.00030131516,0.0002885649,0.00039151812,0.0000016010349],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068486465,0.0000062370054,0.00015793738,0.00038153617,0.00009942112,0.000033991677,0.00006367551,0.9795543,0.001767151,0.008911446,0.000009935439,0.009007537],"study_design_scores_gemma":[0.00070890697,0.00018756787,0.00039015492,0.0024294015,0.00020939065,0.00015112036,0.0015464177,0.03551949,0.024621822,0.0019395916,0.92996544,0.0023307018],"about_ca_topic_score_codex":0.0000027369736,"about_ca_topic_score_gemma":0.000008570312,"teacher_disagreement_score":0.9440348,"about_ca_system_score_codex":0.0001463633,"about_ca_system_score_gemma":0.0000031748164,"threshold_uncertainty_score":0.99987257},"labels":[],"label_agreement":null},{"id":"W3169256824","doi":"","title":"Energy Commitment: A Planning of Energy Carrier Based on Energy Consumption","year":2019,"lang":"en","type":"article","venue":"The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Energy consumption; Energy (signal processing); Energy carrier; Energy accounting; Energy engineering; Energy balance; Energy supply; Environmental economics; Efficient energy use; Energy conservation; Energy policy; Renewable energy; Engineering; Economics; Electrical engineering; Physics","score_opus":0.04030061850477949,"score_gpt":0.2732418483253243,"score_spread":0.23294122982054477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169256824","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8564528,0.0011082892,0.01954786,0.0020323896,0.0044839084,0.00040447293,0.00066496164,0.00058625056,0.114719026],"genre_scores_gemma":[0.9732844,0.000066697066,0.00022613628,0.00010858848,0.0000943646,0.0000038419903,0.00022527605,0.000025825375,0.025964858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99744946,0.00017190719,0.00039503825,0.0004466617,0.0011812024,0.0003557502],"domain_scores_gemma":[0.9985129,0.00028580768,0.00019755212,0.0005440331,0.00036282963,0.000096837604],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004130949,0.00029914765,0.0003991718,0.00058223755,0.00022484554,0.000051330808,0.00082849764,0.00014572783,0.0009366831],"category_scores_gemma":[0.00003428304,0.00026743652,0.00017847787,0.0004967314,0.00057767273,0.00031011438,0.0002290436,0.00013647045,0.00001784496],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044170136,0.00023026114,0.0028428228,0.00014659076,0.00026365486,0.000020975947,0.0008278823,0.61160165,0.0037380813,0.3694826,0.009196841,0.0012069392],"study_design_scores_gemma":[0.001568178,0.00043404967,0.004317659,0.00014068556,0.00008490923,0.0000066386915,0.0016928519,0.16755694,0.01473057,0.0017439171,0.8071109,0.0006127145],"about_ca_topic_score_codex":0.0003043258,"about_ca_topic_score_gemma":0.00016826538,"teacher_disagreement_score":0.797914,"about_ca_system_score_codex":0.00022490759,"about_ca_system_score_gemma":0.000103336715,"threshold_uncertainty_score":0.99997777},"labels":[],"label_agreement":null},{"id":"W3169346838","doi":"10.1016/j.apenergy.2021.117154","title":"A Proof-of-Stake public blockchain based pricing scheme for peer-to-peer energy trading","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Research Foundation Singapore; Agency for Science, Technology and Research","keywords":"Microgrid; Smart contract; Prosumer; Blockchain; Incentive; Distributed generation; Demand response; Business; Tariff; Database transaction; Payment; Computer science; Environmental economics; Computer security; Microeconomics; Economics; Power (physics); Electricity; Finance; Control (management); Engineering","score_opus":0.018635455037880593,"score_gpt":0.20928338141605082,"score_spread":0.19064792637817024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169346838","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03191702,0.0002084342,0.9209119,0.0014934986,0.00082631997,0.00023918092,0.000022746806,0.0006331134,0.043747798],"genre_scores_gemma":[0.9651953,0.0000026940822,0.03046766,0.0006181116,0.00038261284,0.0007407029,0.00013637425,0.00015960807,0.002296933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976516,0.000020713645,0.0004950566,0.00051558594,0.0006058917,0.00071114994],"domain_scores_gemma":[0.99869484,0.00014153431,0.000068829126,0.00061454566,0.00025481588,0.00022543152],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033857036,0.00036229566,0.0004314791,0.00035181656,0.00009706017,0.0000728976,0.00033692404,0.00014857907,0.00009495631],"category_scores_gemma":[0.000094533774,0.00041749864,0.00015402843,0.000915861,0.000026410708,0.00003827019,0.00010029739,0.00010427961,0.0000027404997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018915005,0.000099415214,0.000010923768,0.00013950636,0.0002040252,0.000011267511,0.00010465555,0.74891365,0.04439981,0.17463213,0.01265634,0.018809367],"study_design_scores_gemma":[0.00056139025,0.000026191743,0.0000077612385,0.000022254007,0.000024453073,0.0000015285614,0.00007162618,0.30629963,0.32565737,0.00037719135,0.36662,0.0003306031],"about_ca_topic_score_codex":0.00004224509,"about_ca_topic_score_gemma":0.00016706457,"teacher_disagreement_score":0.93327826,"about_ca_system_score_codex":0.00018726633,"about_ca_system_score_gemma":0.00008665541,"threshold_uncertainty_score":0.9998277},"labels":[],"label_agreement":null},{"id":"W3169704021","doi":"10.5267/j.ijiec.2021.5.005","title":"An explicit evolutionary approach for multiobjective energy consumption planning considering user preferences in smart homes","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Junta de Andalucía; Universidad de la República Uruguay; Universidad Nacional del Sur; Consejo Nacional de Investigaciones Científicas y Técnicas; European Commission; Ministerio de Ciencia e Innovación; Universidad de Málaga; Agencia Nacional de Investigación e Innovación","keywords":"Electricity; Schedule; Computer science; Context (archaeology); Mains electricity; Consumption (sociology); Greedy algorithm; Multi-objective optimization; Evolutionary algorithm; Energy consumption; Set (abstract data type); Service (business); Mathematical optimization; Operations research; Engineering; Machine learning; Business; Algorithm; Marketing; Mathematics","score_opus":0.0487435928434825,"score_gpt":0.2714859075735069,"score_spread":0.22274231473002437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169704021","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16970217,0.0003068782,0.8271005,0.000043353873,0.0024930108,0.000090804,0.00002249568,0.000086174,0.00015462277],"genre_scores_gemma":[0.95094633,0.0000386922,0.048091635,0.000017820967,0.00073067687,0.000034999142,0.0001038722,0.000027967673,0.000007983587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881613,0.00003506736,0.0005327014,0.00015104574,0.000290607,0.0001744436],"domain_scores_gemma":[0.99914485,0.00023893762,0.000110116904,0.00008495521,0.00034573424,0.00007537989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001734592,0.00015685169,0.00021900039,0.00053294474,0.00003521259,0.00009278174,0.00021686431,0.00010065841,0.000014658545],"category_scores_gemma":[0.00015197805,0.00018195149,0.00008565726,0.0001856236,0.000013987164,0.00045023824,0.000032067197,0.00023642361,5.5137434e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026601534,0.00007054946,0.0038485397,0.000011991462,0.00025061413,0.000030999418,0.00020361601,0.9910835,0.00054511346,0.00188316,0.00031230482,0.0017329793],"study_design_scores_gemma":[0.0016158829,0.00004668505,0.006378279,0.00019182771,0.000026125936,0.00009154198,0.00033215928,0.9877605,0.0014483465,0.000140852,0.0017626748,0.0002051686],"about_ca_topic_score_codex":0.000014840483,"about_ca_topic_score_gemma":0.0000045046786,"teacher_disagreement_score":0.78124416,"about_ca_system_score_codex":0.0003005223,"about_ca_system_score_gemma":0.0000908386,"threshold_uncertainty_score":0.7419766},"labels":[],"label_agreement":null},{"id":"W3170479104","doi":"10.1016/j.seta.2021.101370","title":"A review on virtual power plant for energy management","year":2021,"lang":"en","type":"review","venue":"Sustainable Energy Technologies and Assessments","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Scheduling (production processes); Reinforcement learning; Virtual power plant; Scalability; Renewable energy; Artificial intelligence; Distributed computing; Risk analysis (engineering); Operations research; Engineering; Distributed generation; Operations management","score_opus":0.015012249814634088,"score_gpt":0.28247129065301335,"score_spread":0.26745904083837924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170479104","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[9.4850485e-8,0.973366,0.014404167,0.000047336955,0.00047623954,0.00042348675,0.000043644617,0.0010734727,0.010165521],"genre_scores_gemma":[0.0000130746275,0.9883514,0.0006627655,0.00019126362,0.00004533148,0.0033435423,0.0004949244,0.00015527362,0.006742422],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99748695,0.00004011002,0.0005964525,0.00073986925,0.00026770929,0.0008689373],"domain_scores_gemma":[0.99868685,0.000110326066,0.0001623312,0.00091506133,0.000061628176,0.000063802865],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020910444,0.0007549463,0.0014801758,0.0005203228,0.00015968652,0.00013186198,0.00062437926,0.00042537562,0.000027141805],"category_scores_gemma":[0.00003252078,0.0006756353,0.0003556913,0.000637731,0.000060795533,0.00010758242,0.0008192877,0.00025195218,0.000001913006],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001189039,0.000026913265,2.7671962e-8,0.02440739,0.00053013605,0.00016159064,4.63817e-7,0.00014119648,6.246484e-9,0.3502526,0.058071315,0.56640714],"study_design_scores_gemma":[0.00019114591,0.00017610981,4.7545882e-8,0.026732098,0.0005625138,0.00001335104,0.0005375646,0.00013941141,0.000003880331,0.0006399176,0.9703521,0.000651871],"about_ca_topic_score_codex":0.000015448522,"about_ca_topic_score_gemma":0.000003572673,"teacher_disagreement_score":0.9122808,"about_ca_system_score_codex":0.00041322596,"about_ca_system_score_gemma":0.00006256206,"threshold_uncertainty_score":0.9995695},"labels":[],"label_agreement":null},{"id":"W3170912669","doi":"10.1016/j.cor.2021.105366","title":"Revenue optimization in energy networks involving self-scheduled demand and a smart grid","year":2021,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Polytechnique Montréal; Université du Québec à Montréal","funders":"","keywords":"Bilevel optimization; Heuristics; Computer science; Mathematical optimization; Smart grid; Computation; Load balancing (electrical power); Heuristic; Grid; Integer (computer science); Revenue; Optimization problem; Algorithm; Mathematics","score_opus":0.018142100342238402,"score_gpt":0.25707757239183904,"score_spread":0.23893547204960064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170912669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055805426,0.0031806792,0.9389755,0.00040828311,0.0007213569,0.00017968197,0.0000027062347,0.00015099943,0.0005753562],"genre_scores_gemma":[0.8828875,0.006920552,0.10865229,0.00016392201,0.00063079596,0.0001890107,0.00017339789,0.00006656213,0.0003159761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987717,0.00022449251,0.00021045472,0.00026147242,0.00020896859,0.00032290895],"domain_scores_gemma":[0.99940336,0.0000875037,0.000005081974,0.00027159133,0.00014686056,0.00008561035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047789488,0.00010894697,0.00013527198,0.00027716256,0.0001908455,0.00026144492,0.00013661588,0.00007038662,0.000022250808],"category_scores_gemma":[0.000045540608,0.00012928063,0.000019714618,0.00081655924,0.000032313863,0.00021054568,0.00022776506,0.00024292411,0.000003633633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015638132,0.000027011996,0.00034516657,0.000024051586,0.000028887222,0.0000372914,0.0001886103,0.9940614,0.00009404233,0.0014120983,0.0027858885,0.0009939596],"study_design_scores_gemma":[0.00029800157,0.000013735094,0.0014833942,0.00006244753,0.0000041356407,0.00000752116,0.00004474674,0.9942637,0.00019620078,0.000017607337,0.0034874242,0.00012108879],"about_ca_topic_score_codex":0.0001245048,"about_ca_topic_score_gemma":0.0010730772,"teacher_disagreement_score":0.8303232,"about_ca_system_score_codex":0.0001541038,"about_ca_system_score_gemma":0.00005022666,"threshold_uncertainty_score":0.52719104},"labels":[],"label_agreement":null},{"id":"W3173438469","doi":"10.1109/access.2022.3156581","title":"Building Energy Management With Reinforcement Learning and Model Predictive Control: A Survey","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Model predictive control; Reinforcement learning; Computer science; Energy management; Building automation; Building management system; Efficient energy use; Renewable energy; Automation; Control (management); Energy (signal processing); Artificial intelligence; Engineering","score_opus":0.011092185197433609,"score_gpt":0.22536787029738128,"score_spread":0.21427568509994768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173438469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067098014,0.00011597091,0.92410845,0.00001888446,0.00031166378,0.00020499971,0.000007878138,0.00034014898,0.007794002],"genre_scores_gemma":[0.9981585,0.00010290107,0.00050618703,0.00012485334,0.00004359931,0.00042453,0.000016376944,0.000054459786,0.00056857493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987952,0.00006507606,0.0001860935,0.00027473777,0.00036360268,0.0003152584],"domain_scores_gemma":[0.99962306,0.000046988327,0.000046893034,0.00018859105,0.00002464322,0.0000697984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031243305,0.00019134601,0.00017828312,0.00018099256,0.00021929324,0.00009766461,0.00029279862,0.000019738396,0.00003294773],"category_scores_gemma":[0.0000033465951,0.00019587856,0.000022426035,0.00027001585,0.00002251486,0.0002447062,0.0002696948,0.00016959508,6.75298e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008654447,0.000010893066,0.0027520442,0.00003330383,0.0002763416,0.000022507136,0.000047889258,0.9930151,0.000043599295,0.0016745187,0.0010946062,0.00094265456],"study_design_scores_gemma":[0.0009787765,0.00008514194,0.003298599,0.0000131729275,0.000050778468,0.0000032434002,0.000040355975,0.99005425,0.00019404909,0.00009748441,0.0049441317,0.00024001129],"about_ca_topic_score_codex":0.00017041471,"about_ca_topic_score_gemma":0.00005087712,"teacher_disagreement_score":0.9310605,"about_ca_system_score_codex":0.00018080446,"about_ca_system_score_gemma":0.000007676937,"threshold_uncertainty_score":0.79876953},"labels":[],"label_agreement":null},{"id":"W31747851","doi":"10.1080/10826084.2019.1691594","title":"A simulation tool for demand response programs implementation","year":2012,"lang":"en","type":"article","venue":"Substance Use & Misuse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Computer science; Reliability (semiconductor); Point (geometry); Operations research; Simulation; Engineering","score_opus":0.03723178800602019,"score_gpt":0.2966599518948751,"score_spread":0.2594281638888549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W31747851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87173235,0.00020839131,0.12659469,0.00002048451,0.00045597952,0.00062594994,0.000008756017,0.00033319148,0.000020209296],"genre_scores_gemma":[0.99308664,0.000019309737,0.006092865,0.00003736398,0.00019693308,0.00030755266,0.00006601771,0.00005353267,0.00013977569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990437,0.000036241032,0.00022370016,0.00013666235,0.00014875348,0.0004109465],"domain_scores_gemma":[0.9993792,0.00021583567,0.000036082707,0.00025258996,0.00004896849,0.00006728678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039470714,0.0001477711,0.000108066735,0.00007527409,0.00006944263,0.00006140006,0.00007633183,0.000045453857,0.00003283473],"category_scores_gemma":[0.000052419782,0.00015945584,0.000053562137,0.00017224505,0.000012274135,0.00067115476,0.000009652242,0.000044588895,0.000024387171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004984921,0.00007457592,0.041278157,0.00010538699,0.00010411022,0.0000021696953,0.0022895345,0.9379307,0.0032430433,0.0007846992,0.0025948815,0.011094262],"study_design_scores_gemma":[0.0043170494,0.00017393741,0.18334924,0.000094510535,0.00017444546,0.0000020241555,0.0007199823,0.37399596,0.016344432,0.00024017582,0.41941702,0.0011712128],"about_ca_topic_score_codex":0.000004608355,"about_ca_topic_score_gemma":0.00006268734,"teacher_disagreement_score":0.56393474,"about_ca_system_score_codex":0.0001583523,"about_ca_system_score_gemma":0.0000059912986,"threshold_uncertainty_score":0.65024203},"labels":[],"label_agreement":null},{"id":"W3175263299","doi":"10.82308/20790","title":"Weighted scalarization versus compromise solution in multi-objective economic dispatch for microgrids","year":2017,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Compromise; Economic dispatch; Mathematical optimization; Economics; Econometrics; Computer science; Mathematics; Electric power system","score_opus":0.025110993432655982,"score_gpt":0.24308809033177814,"score_spread":0.21797709689912215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175263299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9878455,0.00005421196,0.00038153928,0.0000343368,0.003541718,0.0009984366,0.0003797453,0.00042808874,0.0063364604],"genre_scores_gemma":[0.9933401,0.00007555761,0.0057243346,0.000021697153,0.000078997255,0.00032416053,0.00013914665,0.00012985514,0.00016619045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804586,0.000069656366,0.0004899181,0.0006053465,0.00016324448,0.0006260019],"domain_scores_gemma":[0.9986977,0.00010984543,0.00016795628,0.0008026291,0.00006746516,0.0001544253],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046967817,0.00040135573,0.00038012007,0.00025633824,0.0008802603,0.00014806248,0.000577199,0.00025353403,0.000031225347],"category_scores_gemma":[0.00016108398,0.00048350825,0.00015822641,0.00010501289,0.00007247051,0.0010523449,0.00022995504,0.00035738683,0.00013504893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020308644,0.0011188248,0.008484606,0.000882707,0.0016343019,0.00008276233,0.0000490862,0.42600846,0.1756992,0.098699205,0.0001347242,0.28517523],"study_design_scores_gemma":[0.018753218,0.0002785874,0.08443568,0.00023118751,0.00021745573,0.0000062613117,0.000072975316,0.69782203,0.14785647,0.0031658316,0.04510114,0.0020591617],"about_ca_topic_score_codex":0.0004891496,"about_ca_topic_score_gemma":0.0032538273,"teacher_disagreement_score":0.28311607,"about_ca_system_score_codex":0.0016590592,"about_ca_system_score_gemma":0.000011189199,"threshold_uncertainty_score":0.99976164},"labels":[],"label_agreement":null},{"id":"W3175609235","doi":"10.32920/ryerson.14665608.v1","title":"Load balancing for smart grid: centralized and distributed approaches","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Load balancing (electrical power); Smart grid; Computer science; Distributed computing; Grid; Scheduling (production processes); Electric power system; Distributed generation; Jacobian matrix and determinant; Load management; Demand response; Electric power; Power (physics); Mathematical optimization; Electrical engineering; Electricity; Engineering; Renewable energy; Mathematics","score_opus":0.027528562968528784,"score_gpt":0.20306941434108325,"score_spread":0.17554085137255446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175609235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08823937,0.002571564,0.8903938,0.0003979591,0.0056571527,0.0012064765,0.00029757497,0.001472525,0.009763567],"genre_scores_gemma":[0.9602674,0.00071907457,0.032802258,0.00008745224,0.0008255559,0.00071783183,0.0037432828,0.00015988233,0.00067723735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866694,0.000018225786,0.00029340896,0.00044971216,0.00018102922,0.00039068062],"domain_scores_gemma":[0.9993165,0.000055413602,0.000036004843,0.00044292092,0.000042909054,0.00010624721],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018691407,0.00033986187,0.0004169275,0.000052314284,0.000042546504,0.00018952596,0.00017512574,0.00020787958,0.000058306076],"category_scores_gemma":[0.000040798663,0.00035131638,0.00012766542,0.0000776913,0.00002096212,0.000056832974,0.00046145185,0.00023422709,0.0000024014412],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015203107,0.000037651847,0.0014806256,0.0023813806,0.0007707321,0.000014187147,0.00021266523,0.95894164,0.0001412018,0.0014542589,0.032311898,0.0022385719],"study_design_scores_gemma":[0.0012307694,0.000013391522,0.007144215,0.00023979906,0.00024353672,0.0000057946027,0.0004551571,0.90475243,0.002624396,0.00033934484,0.08191755,0.0010336473],"about_ca_topic_score_codex":0.00009369544,"about_ca_topic_score_gemma":0.00013042394,"teacher_disagreement_score":0.87202805,"about_ca_system_score_codex":0.00024784723,"about_ca_system_score_gemma":0.000036797042,"threshold_uncertainty_score":0.9998939},"labels":[],"label_agreement":null},{"id":"W3176136760","doi":"10.1145/3447555.3464856","title":"Disaggregating Solar Generation Using Smart Meter Data and Proxy Measurements from Neighbouring Sites","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"AKA; Proxy (statistics); Software deployment; Smart meter; Metre; Computer science; Real-time computing; Environmental science; Smart grid; Engineering; Electrical engineering; Operating system","score_opus":0.11276479485679682,"score_gpt":0.2579790024485769,"score_spread":0.1452142075917801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3176136760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8829926,0.00086790527,0.11378967,0.000031657895,0.00051892386,0.00008258361,0.000012497229,0.00017016004,0.0015339617],"genre_scores_gemma":[0.92675656,0.000034635945,0.07225854,0.00007591332,0.00049992587,0.0000055214823,0.0002674811,0.000038501184,0.00006293751],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990664,0.000033377328,0.0001930455,0.00027886187,0.00020945589,0.000218848],"domain_scores_gemma":[0.9993876,0.000023104247,0.000023024877,0.00047876465,0.000026752392,0.000060745097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016319726,0.00014134646,0.00012561922,0.0000385981,0.000087455395,0.00016319378,0.0001202649,0.000037179867,0.00009495819],"category_scores_gemma":[0.00006382072,0.00014605162,0.000016794407,0.00010066343,0.000008656179,0.00058169564,0.00031955045,0.00006777658,0.000006360849],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017841901,0.000035203404,0.18620867,0.000081074315,0.00047554157,0.000013477701,0.00032005413,0.11968018,0.6845082,0.00005399052,0.0013769643,0.0072448426],"study_design_scores_gemma":[0.00016673983,0.0000021448516,0.0035494969,0.000031673804,0.00005429899,0.000002075033,0.00006419592,0.8634899,0.13150361,0.000014038158,0.0009463393,0.00017545301],"about_ca_topic_score_codex":0.00008140984,"about_ca_topic_score_gemma":0.00016928285,"teacher_disagreement_score":0.74380976,"about_ca_system_score_codex":0.00005961521,"about_ca_system_score_gemma":0.000007719289,"threshold_uncertainty_score":0.59558123},"labels":[],"label_agreement":null},{"id":"W3179133810","doi":"10.1109/iccworkshops50388.2021.9473855","title":"Cost-Aware Dynamic Bayesian Coalitional Game for Energy Trading among Microgrids","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Computer science; Mathematical optimization; Game theory; Scheme (mathematics); Electricity; Minification; Energy (signal processing); Electricity generation; Peer-to-peer; Operations research; Microeconomics; Distributed computing; Economics; Artificial intelligence; Engineering; Mathematics; Power (physics); Control (management)","score_opus":0.01148920758937447,"score_gpt":0.2197321498076911,"score_spread":0.20824294221831663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3179133810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013838865,0.00020697007,0.9742224,0.00023040839,0.0009443387,0.00012866707,0.00004529382,0.0005419297,0.009841108],"genre_scores_gemma":[0.99083996,0.000050279043,0.0048548137,0.00024047328,0.0001905302,0.00020621948,0.00041056008,0.00006483329,0.0031423192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905723,0.000014521266,0.00021414881,0.00024161293,0.00013270159,0.00033979182],"domain_scores_gemma":[0.99956185,0.00006386214,0.000015569509,0.00021767223,0.000045295943,0.0000957791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000660207,0.00017326657,0.0001640083,0.00008387386,0.00005201704,0.000061019393,0.00011759537,0.000073111245,0.0005631564],"category_scores_gemma":[0.000008184307,0.00019709174,0.00011532962,0.00016342667,0.000025146554,0.00012176467,0.000035489076,0.00006395826,0.000007168954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021262338,0.00017824768,0.0022716525,0.00045451237,0.0009584363,0.00017835289,0.00024856825,0.7708018,0.00974887,0.07123283,0.116934605,0.026970875],"study_design_scores_gemma":[0.00047603305,0.000011982847,0.0029799452,0.000029807821,0.000030456742,0.0000124221815,0.0001531078,0.90156436,0.008849739,0.0006394544,0.08494297,0.00030970701],"about_ca_topic_score_codex":0.00002834841,"about_ca_topic_score_gemma":0.00047869713,"teacher_disagreement_score":0.97700113,"about_ca_system_score_codex":0.00017043014,"about_ca_system_score_gemma":0.000018828163,"threshold_uncertainty_score":0.8037168},"labels":[],"label_agreement":null},{"id":"W3179183900","doi":"10.1016/j.knosys.2021.107293","title":"Edge and fog computing using IoT for direct load optimization and control with flexibility services for citizen energy communities","year":2021,"lang":"en","type":"article","venue":"Knowledge-Based Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Colegiul Consultativ pentru Cercetare-Dezvoltare şi Inovare; Unitatea Executiva pentru Finantarea Invatamantului Superior, a Cercetarii, Dezvoltarii si Inovarii; Ontario Ministry of Research, Innovation and Science","keywords":"Smart grid; Flexibility (engineering); Computer science; Demand response; Bidding; Electricity; Edge computing; Grid; Enhanced Data Rates for GSM Evolution; Distributed computing; Engineering; Telecommunications; Business; Electrical engineering","score_opus":0.018152582033766816,"score_gpt":0.22693335887161578,"score_spread":0.20878077683784896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3179183900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086377725,0.005481525,0.9053114,0.000018261382,0.0006760052,0.00073324924,0.00006404415,0.00027795834,0.001059809],"genre_scores_gemma":[0.9931038,0.00001086798,0.006190875,0.000032736454,0.00026374747,0.00018019871,0.00007283049,0.00006388935,0.000081045786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989549,0.00012484877,0.0003012315,0.00024020714,0.00010476041,0.00027404554],"domain_scores_gemma":[0.9986622,0.00054505153,0.00006975385,0.00029876633,0.0003504333,0.00007383322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044305398,0.0002346554,0.0004068192,0.00008473409,0.0002463676,0.000175554,0.00009168064,0.000079904275,0.000001981455],"category_scores_gemma":[0.000015901674,0.00023059013,0.000045516135,0.00014438968,0.0000506619,0.000069897076,0.000041460546,0.000050172177,1.7100658e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052955307,0.000026105277,0.0008905748,0.003193358,0.00015620925,0.000001010343,0.00041269857,0.9942487,0.0003554163,0.00025097662,0.000059378635,0.0003526381],"study_design_scores_gemma":[0.0024537782,0.00006504209,0.00008216872,0.0005782693,0.00011363185,0.000004838534,0.0007869211,0.99045396,0.0014034803,0.000008831487,0.0037841885,0.0002648859],"about_ca_topic_score_codex":0.00021762888,"about_ca_topic_score_gemma":0.000883388,"teacher_disagreement_score":0.90672606,"about_ca_system_score_codex":0.00016603216,"about_ca_system_score_gemma":0.00006412417,"threshold_uncertainty_score":0.9403193},"labels":[],"label_agreement":null},{"id":"W3180975163","doi":"10.3390/electronics10141618","title":"Autonomous Fuzzy Controller Design for the Utilization of Hybrid PV-Wind Energy Resources in Demand Side Management Environment","year":2021,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"National Research Foundation of Korea; Chung-Ang University; Taif University; National Research Foundation","keywords":"Photovoltaic system; Renewable energy; Automotive engineering; Controller (irrigation); Energy management; Computer science; Wind power; Engineering; Simulation; Energy (signal processing); Electrical engineering","score_opus":0.011376283698343677,"score_gpt":0.19104692904009596,"score_spread":0.17967064534175228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3180975163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017096877,0.030484265,0.9480326,0.000241078,0.0002080693,0.00054754165,0.000004670842,0.00008851254,0.0032963478],"genre_scores_gemma":[0.988263,0.008455616,0.0019866948,0.00010501236,0.00006867265,0.00017789815,0.000019633066,0.00004965206,0.0008738368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989165,0.000054810786,0.00029214556,0.0002088202,0.00016970657,0.0003579922],"domain_scores_gemma":[0.9994777,0.00015381745,0.00004670543,0.00028164513,0.000013856192,0.000026268839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029604978,0.00015580928,0.00019004001,0.000080015314,0.00005138611,0.000023397852,0.00016596471,0.000031579264,0.000020643602],"category_scores_gemma":[0.000011428195,0.00014221229,0.00006527591,0.00013053896,0.000021023372,0.0000425052,0.000056130084,0.000074129166,0.00000269912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028707762,0.000035925095,0.000019122801,0.000033432698,0.00020190512,0.000008732076,0.000054969914,0.9801858,0.0006270563,0.0066228425,0.00096872717,0.011212749],"study_design_scores_gemma":[0.0012346199,0.000070776805,0.0006394768,0.000018124478,0.00010273104,0.000003649146,0.00007823781,0.5571983,0.039260842,0.0025266637,0.3986716,0.0001949652],"about_ca_topic_score_codex":0.0000037863533,"about_ca_topic_score_gemma":0.000033670207,"teacher_disagreement_score":0.97116613,"about_ca_system_score_codex":0.00026365666,"about_ca_system_score_gemma":0.000017600247,"threshold_uncertainty_score":0.5799249},"labels":[],"label_agreement":null},{"id":"W3182429186","doi":"10.32920/ryerson.14665155.v1","title":"A multi-level optimization technique for electricity consumption management and pricing in residential neighborhoods","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Smart grid; Energy management; Demand response; Revenue; Energy consumption; Electricity; Environmental economics; Operations research; Risk analysis (engineering); Business; Energy (signal processing); Engineering; Economics","score_opus":0.02948659525984441,"score_gpt":0.2543964155637073,"score_spread":0.2249098203038629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182429186","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074322554,0.00036196483,0.9889429,0.000024973464,0.0004404184,0.0018048314,0.0000068354284,0.00031053263,0.0006752667],"genre_scores_gemma":[0.28981832,0.0019831087,0.7058778,0.000032724784,0.000073788615,0.0016676192,0.00018871535,0.00007616924,0.00028173692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862695,0.00003694856,0.00040617332,0.0004886939,0.00015180529,0.00028940983],"domain_scores_gemma":[0.99949235,0.000034866927,0.000060652616,0.00032419225,0.00004518885,0.00004277795],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031156602,0.00028743956,0.0002949391,0.00048969674,0.000038458842,0.00013588586,0.00014968897,0.0002432506,0.00002936767],"category_scores_gemma":[0.000020902182,0.00034556157,0.00006139266,0.00019194813,0.0000129526115,0.00010201736,0.00043344,0.0002691351,7.2317795e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009263113,0.000035595986,0.000509926,0.0013106382,0.000115942625,0.000011442836,0.000044122116,0.99567455,0.0005591209,0.00027351093,0.00019294905,0.0012629523],"study_design_scores_gemma":[0.00069195696,0.000010639333,0.018502275,0.00029186648,0.00007604594,0.0000023907112,0.00003314908,0.9747838,0.00509908,0.00007103208,0.00005207138,0.0003857175],"about_ca_topic_score_codex":0.000077136785,"about_ca_topic_score_gemma":0.00021060577,"teacher_disagreement_score":0.2830651,"about_ca_system_score_codex":0.0003397381,"about_ca_system_score_gemma":0.000014905634,"threshold_uncertainty_score":0.9998996},"labels":[],"label_agreement":null},{"id":"W3182738738","doi":"10.1109/tase.2021.3091334","title":"<i>Q</i>-Learning-Based Model Predictive Control for Energy Management in Residential Aggregator","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Automation Science and Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Polytechnique Montréal","funders":"","keywords":"News aggregator; Demand response; Model predictive control; Computer science; Integer programming; Mathematical optimization; Engineering; Electricity; Control (management); Artificial intelligence; Algorithm; Mathematics; Electrical engineering","score_opus":0.0060355413539471625,"score_gpt":0.2008007432666064,"score_spread":0.19476520191265925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182738738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013270177,0.000026336753,0.98546183,0.00008406615,0.00045534663,0.00013807906,0.0000062473005,0.00037160452,0.00018633388],"genre_scores_gemma":[0.99546844,0.000038379454,0.0040841606,0.00006723586,0.00001880823,0.0002335631,0.0000021195758,0.000021602264,0.00006570722],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990028,0.000008266279,0.00018925742,0.00024629958,0.00029898935,0.00025435578],"domain_scores_gemma":[0.99965745,0.00004081626,0.000016877913,0.00013912303,0.000073115676,0.00007258587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024584963,0.0001288627,0.00011615242,0.00043685586,0.00011341674,0.000085048494,0.000093697956,0.00004012451,0.0000049042264],"category_scores_gemma":[0.000011214701,0.00015257341,0.000036220572,0.00061184814,0.00003248386,0.00030327708,0.000001489104,0.00008812882,0.0000014351743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008020782,0.00001682886,0.0000013820371,0.000048174552,0.000020297077,0.0000038297194,0.000057465222,0.99301904,0.0031307493,0.00032626354,0.000033984565,0.0033339397],"study_design_scores_gemma":[0.00075508875,0.00002530597,0.00020927607,0.000049271755,0.000021475054,0.0000013929666,0.00004276982,0.9768929,0.021473441,0.000025775631,0.00035992882,0.00014339718],"about_ca_topic_score_codex":0.000002966964,"about_ca_topic_score_gemma":0.000015708169,"teacher_disagreement_score":0.98219824,"about_ca_system_score_codex":0.00018925534,"about_ca_system_score_gemma":0.000040838993,"threshold_uncertainty_score":0.6221763},"labels":[],"label_agreement":null},{"id":"W3184507390","doi":"10.1016/j.est.2021.102915","title":"Realistic coordination and sizing of a solar array combined with pumped hydro storage system","year":2021,"lang":"en","type":"article","venue":"Journal of Energy Storage","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Yarmouk University","keywords":"Sizing; Photovoltaic system; Solar irradiance; Power (physics); Renewable energy; Reliability (semiconductor); Reliability engineering; Particle swarm optimization; Environmental science; Computer science; Net present value; Automotive engineering; Process engineering; Engineering; Electrical engineering; Production (economics); Meteorology; Physics; Chemistry; Algorithm","score_opus":0.006034146673992005,"score_gpt":0.17856696763064997,"score_spread":0.17253282095665795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184507390","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7595238,0.0016466238,0.23193456,0.0001397145,0.0011461431,0.000060038317,0.000007731759,0.000098057295,0.005443302],"genre_scores_gemma":[0.9981064,0.00008286085,0.0013574488,0.000019161123,0.00017139887,0.0000033069464,0.0000071166705,0.00004159859,0.00021067572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988172,0.000079702775,0.0004604006,0.00012316414,0.00034254638,0.00017698496],"domain_scores_gemma":[0.9991135,0.00008469383,0.00026660613,0.00021182021,0.00021730532,0.00010608619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030376404,0.00017043784,0.00040653264,0.00020910095,0.000047629568,0.000040030733,0.000118878364,0.000062625964,0.000010191394],"category_scores_gemma":[0.000045860386,0.00015338637,0.00006634815,0.0002790641,0.00003120823,0.00021034801,0.000028661369,0.00014753094,3.5610856e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011003904,0.00007050006,0.00031181195,0.0004889737,0.0005455327,0.00095664867,0.0002301187,0.9577745,0.030747207,0.007243312,0.00089036056,0.0006309685],"study_design_scores_gemma":[0.016400153,0.0032952467,0.016126394,0.0052455487,0.0020146372,0.0031491856,0.0055597913,0.6645631,0.20946322,0.0005081176,0.071031176,0.002643411],"about_ca_topic_score_codex":0.00002880086,"about_ca_topic_score_gemma":0.000055841578,"teacher_disagreement_score":0.2932114,"about_ca_system_score_codex":0.00020383847,"about_ca_system_score_gemma":0.000043008342,"threshold_uncertainty_score":0.6254915},"labels":[],"label_agreement":null},{"id":"W3186065431","doi":"10.1115/1.4051735","title":"Economic Control for a Residential Photovoltaic-Battery System by Combining Stochastic Model Predictive Control and Improved Correction Strategy","year":2021,"lang":"en","type":"article","venue":"Journal of Energy Resources Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"National Natural Science Foundation of China","keywords":"Photovoltaic system; Stand-alone power system; Model predictive control; Computer science; Electricity; Automotive engineering; Electricity generation; Grid-connected photovoltaic power system; Grid; Limit (mathematics); Electric power system; Maximum power point tracking; Power (physics); Reliability engineering; Renewable energy; Distributed generation; Control theory (sociology); Control (management); Engineering; Electrical engineering; Voltage; Mathematics","score_opus":0.0031837489399020426,"score_gpt":0.17759564743151574,"score_spread":0.1744118984916137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186065431","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2627221,0.0013654804,0.7342371,0.00010442852,0.0010488504,0.00012118053,0.000033414773,0.00019071931,0.00017672082],"genre_scores_gemma":[0.99915266,0.00004914309,0.0002637023,0.00004499528,0.000232568,0.00007482903,0.000005163406,0.000052695643,0.000124267],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868137,0.000039959257,0.00061612786,0.00023034617,0.000111259986,0.00032095736],"domain_scores_gemma":[0.9991117,0.00015950357,0.00030778928,0.00019567927,0.0001402871,0.00008501801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020898323,0.00022462016,0.0005410615,0.00040297463,0.00009283692,0.00006617419,0.00019384878,0.0002549483,0.0000032879911],"category_scores_gemma":[0.000051556344,0.00023421035,0.000109484485,0.00011287986,0.00008144161,0.00014269489,0.00004149598,0.00026673984,4.333141e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024787255,0.000019753712,0.00007439377,0.00003888076,0.0005539431,0.00001872986,0.000028743632,0.9497927,0.045337066,0.00048171944,0.0027896708,0.00061654014],"study_design_scores_gemma":[0.0038294997,0.00040007965,0.000035620254,0.00009465531,0.00022588813,0.00028790353,0.00070578424,0.9869386,0.0060982644,0.00027380092,0.00092368823,0.000186223],"about_ca_topic_score_codex":0.000021300853,"about_ca_topic_score_gemma":0.00006144096,"teacher_disagreement_score":0.7364305,"about_ca_system_score_codex":0.00027811047,"about_ca_system_score_gemma":0.00005292419,"threshold_uncertainty_score":0.9550821},"labels":[],"label_agreement":null},{"id":"W3187350720","doi":"10.1016/j.enbuild.2021.111330","title":"Impacts of COVID-19 related stay-at-home restrictions on residential electricity use and implications for future grid stability","year":2021,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Building Technologies Office; Office of Energy Efficiency and Renewable Energy; U.S. Department of Energy","keywords":"Electricity; Metropolitan area; Mains electricity; Work (physics); Coronavirus disease 2019 (COVID-19); Peak demand; Consumption (sociology); Quarter (Canadian coin); Environmental economics; Environmental science; Business; Engineering; Geography; Economics; Medicine","score_opus":0.014407173973875404,"score_gpt":0.2336073233555749,"score_spread":0.21920014938169952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3187350720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99235487,0.0006980682,0.00513412,0.0010772467,0.00031866744,0.00009035962,0.00008307024,0.00014175574,0.00010182657],"genre_scores_gemma":[0.9969662,0.0018417141,0.00068112515,0.000124746,0.00014947217,0.000036625395,0.00007319059,0.000022391914,0.0001045283],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99915624,0.000034060402,0.00023559181,0.00027428847,0.000087959495,0.00021188063],"domain_scores_gemma":[0.99922633,0.00023522266,0.000051837367,0.00026371912,0.00006444893,0.00015843697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013781761,0.00013659627,0.00016834903,0.00012853094,0.00020092599,0.000041771364,0.00006303127,0.000108798704,0.000021245733],"category_scores_gemma":[0.00019114216,0.0001419185,0.000050640356,0.00040387356,0.000041723062,0.00015520745,0.00006427719,0.00008375754,1.8028504e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045099622,0.00034997545,0.08620114,0.0006064732,0.00088185485,0.000022454851,0.001164488,0.12581426,0.16633411,0.54166216,0.0738343,0.0026778057],"study_design_scores_gemma":[0.0026540938,0.00032839394,0.49433485,0.00004900327,0.00025626709,0.00005901302,0.0002579084,0.003881896,0.1344154,0.010568021,0.35238472,0.00081045233],"about_ca_topic_score_codex":0.00031659746,"about_ca_topic_score_gemma":0.00072296825,"teacher_disagreement_score":0.53109413,"about_ca_system_score_codex":0.00016626607,"about_ca_system_score_gemma":0.00004145157,"threshold_uncertainty_score":0.5787268},"labels":[],"label_agreement":null},{"id":"W3188345843","doi":"10.11575/prism/36122","title":"Minimizing Demand Transmission Service Charges in Optimal Sizing and Scheduling Of Campus Microgrids","year":2019,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sizing; Scheduling (production processes); Service (business); Transmission (telecommunications); Operations research; Computer science; Engineering; Business; Operations management; Telecommunications; Marketing; Chemistry","score_opus":0.013499791928950646,"score_gpt":0.2530761061089705,"score_spread":0.23957631418001987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3188345843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903274,0.0028880956,0.00026117652,0.000018869272,0.00045492855,0.00044216754,0.000007823412,0.0000058967366,0.005593644],"genre_scores_gemma":[0.95296925,0.0009715058,0.04434729,0.000012159107,0.00007887643,0.00003773942,0.00047685625,0.00012085862,0.0009854888],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988101,0.000022927201,0.0004196307,0.0003477058,0.00014669582,0.00025295286],"domain_scores_gemma":[0.9995543,0.000047095087,0.00010014732,0.00020509478,0.000037269365,0.000056100955],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025474228,0.00028282448,0.00045670886,0.00023501946,0.00003248672,0.00009635511,0.00033168928,0.00023457085,0.00015324664],"category_scores_gemma":[0.0000073864812,0.00031200476,0.00004129286,0.00021410274,0.0000074897544,0.00021758358,0.00006327433,0.00023499886,0.000019063235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018241325,0.00007173678,0.0011241323,0.0029424487,0.00024216165,0.000030817875,0.012501422,0.66198224,0.12536988,0.0000076156393,0.000040302344,0.19550483],"study_design_scores_gemma":[0.0045746504,0.00014676365,0.015634466,0.010398442,0.0005080895,0.000015283653,0.018512925,0.5150985,0.40262023,0.000011645896,0.030046837,0.0024321734],"about_ca_topic_score_codex":0.00009320782,"about_ca_topic_score_gemma":0.00023316828,"teacher_disagreement_score":0.27725038,"about_ca_system_score_codex":0.000047189875,"about_ca_system_score_gemma":0.0000356654,"threshold_uncertainty_score":0.9999332},"labels":[],"label_agreement":null},{"id":"W3188564586","doi":"10.1145/2796314.2745884","title":"Pricing Bilateral Electricity Trade between Smart Grids and Hybrid Green Datacenters","year":2015,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Computer science; Smart grid; Distributed generation; Scalability; Cloud computing; Mathematical optimization; Distributed computing; Robustness (evolution); Dynamic pricing; Electricity; Grid; Linearization; Nash equilibrium; Nonlinear system; Renewable energy; Engineering; Economics; Electrical engineering","score_opus":0.07899523997553501,"score_gpt":0.2913578760726048,"score_spread":0.21236263609706982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3188564586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8858005,0.100657165,0.0061245253,0.0009606641,0.0011310156,0.0018487783,0.000017592549,0.0004867103,0.0029730538],"genre_scores_gemma":[0.89785355,0.100059785,0.00084696634,0.0005347317,0.00025735606,0.00010380519,0.00025905494,0.00004916335,0.000035580546],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977165,0.00011665923,0.00055642566,0.0003256746,0.0009066092,0.00037814773],"domain_scores_gemma":[0.9987871,0.00014205748,0.00011143081,0.0006811952,0.00008876915,0.00018945444],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003238561,0.00026951483,0.00041184007,0.00046183335,0.00007703784,0.00005703149,0.00042507946,0.000047436373,0.0000396993],"category_scores_gemma":[0.00083719316,0.00025529315,0.000054957913,0.0017187309,0.000024575163,0.00063928025,0.00016361049,0.00022316244,0.000052959782],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005056899,0.000023146673,0.08681214,0.0023361542,0.00014691512,0.0000021208161,0.00006526824,0.00978,0.000012384614,0.000013155703,0.027889572,0.8729141],"study_design_scores_gemma":[0.0020162452,0.0003203715,0.16239703,0.0016513227,0.0010772318,0.000031176234,0.000016218313,0.46547392,0.0012614977,0.00012529168,0.36444706,0.001182629],"about_ca_topic_score_codex":0.000023378152,"about_ca_topic_score_gemma":0.0000035877154,"teacher_disagreement_score":0.87173146,"about_ca_system_score_codex":0.00049740635,"about_ca_system_score_gemma":0.00004890673,"threshold_uncertainty_score":0.9999899},"labels":[],"label_agreement":null},{"id":"W3190330924","doi":"10.1145/2637364.2591999","title":"Randomized auction design for electricity markets between grids and microgrids","year":2014,"lang":"en","type":"article","venue":"ACM SIGMETRICS Performance Evaluation Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Computer science; Double auction; Common value auction; Electricity; Mathematical optimization; Grid; Auction theory; Combinatorial auction; Reverse auction; Microeconomics; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.05328012082800311,"score_gpt":0.291645716438151,"score_spread":0.23836559561014792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3190330924","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08687933,0.10669257,0.79686785,0.00050755445,0.0011313511,0.0065607433,0.000004695347,0.00041401008,0.0009419197],"genre_scores_gemma":[0.6132641,0.35393503,0.028636986,0.00057700684,0.0007339418,0.0024980432,0.00015715508,0.000094052804,0.0001037016],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978692,0.00041138005,0.00062645454,0.0002886517,0.0005003048,0.00030398718],"domain_scores_gemma":[0.99750245,0.0015151016,0.00014811289,0.00048292917,0.00027313427,0.00007829554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01344552,0.00024482573,0.0006638201,0.0004194384,0.00012247368,0.000048467664,0.00025813334,0.00008368716,0.00004791861],"category_scores_gemma":[0.004775063,0.00022290285,0.00012078419,0.0012602701,0.000035000943,0.00026957027,0.000055217122,0.00012903969,0.000024657076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000371281,0.000016288564,0.00074383203,0.0032541573,0.00018722287,4.9570303e-8,0.000016226082,0.033328544,0.00002984616,0.00007799847,0.016557388,0.94541717],"study_design_scores_gemma":[0.02445349,0.00009894725,0.0054215924,0.0005449315,0.0010308004,0.0000017469113,0.0000011754972,0.92674345,0.00096708233,0.00044452492,0.03989018,0.00040206654],"about_ca_topic_score_codex":0.0000013837451,"about_ca_topic_score_gemma":1.8383543e-7,"teacher_disagreement_score":0.9450151,"about_ca_system_score_codex":0.00016962996,"about_ca_system_score_gemma":0.00002473672,"threshold_uncertainty_score":0.9089714},"labels":[],"label_agreement":null},{"id":"W3191309703","doi":"10.1109/icjece.2021.3091718","title":"Analysis of Key Performance Indicators for Local Electricity Markets’ Design","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Tariff; Incentive; Electricity; Remuneration; Electricity market; Environmental economics; Business; Work (physics); Consumption (sociology); Market share; Industrial organization; Microeconomics; Economics; Marketing; Finance; Engineering","score_opus":0.005136068738989218,"score_gpt":0.15328415259173198,"score_spread":0.14814808385274275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191309703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.215647,0.0011400118,0.7829424,0.000014567299,0.00017855746,0.00003494197,0.0000017333791,0.000012419922,0.000028358238],"genre_scores_gemma":[0.9911545,0.0001157959,0.008560959,0.00002769591,0.00011200786,0.000002642941,0.0000024271903,0.000016421933,0.000007584937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916536,0.00001458932,0.00031297692,0.00009799276,0.000104693565,0.00030439702],"domain_scores_gemma":[0.9993339,0.00014592992,0.000046337962,0.0000876037,0.000084635474,0.00030156056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018759962,0.0001228236,0.00032650432,0.0010173857,0.000033616536,0.000027546716,0.00013055367,0.000056520148,0.000010261547],"category_scores_gemma":[0.00003019383,0.00012688967,0.00012046473,0.0015157163,0.000013984165,0.00007255904,0.000008748337,0.00016061199,1.612112e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056594463,0.000005232947,0.0019388803,0.000040549006,0.0007539178,0.000028955685,0.000032682376,0.9681499,0.00007391557,0.00022905169,0.0004201927,0.02832104],"study_design_scores_gemma":[0.00018313622,0.00009159677,0.038608972,0.000019551218,0.0002464951,0.000028275808,0.0000016071542,0.95574194,0.0022975449,0.0000065399813,0.0026478807,0.00012647572],"about_ca_topic_score_codex":0.000019552526,"about_ca_topic_score_gemma":0.000045463603,"teacher_disagreement_score":0.77550745,"about_ca_system_score_codex":0.00013610692,"about_ca_system_score_gemma":0.00011554081,"threshold_uncertainty_score":0.5174411},"labels":[],"label_agreement":null},{"id":"W3194896812","doi":"10.48336/jj7e-mk89","title":"Design of a photovoltaic system for a house in Pakistan and its open source ultra-low power data logger","year":2022,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Photovoltaic system; Microcontroller; Sleep mode; Real-time computing; Embedded system; Electrical engineering; Software; Data acquisition; Computer hardware; Engineering; Computer science; Power (physics); Automotive engineering; Operating system; Power consumption","score_opus":0.039164272006618935,"score_gpt":0.2785541413888936,"score_spread":0.2393898693822747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3194896812","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8338638,0.00074275286,0.0052087638,0.000031859043,0.044644736,0.017829021,0.0013779997,0.0016023117,0.09469879],"genre_scores_gemma":[0.9381001,0.00045945638,0.00061555265,0.0000028918848,0.001688839,0.00001854645,0.0012440607,0.00036817757,0.05750235],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956945,0.0009907237,0.0004387177,0.0011488267,0.0009696899,0.0007574996],"domain_scores_gemma":[0.9972222,0.00066799525,0.00022552074,0.0012252482,0.00039338964,0.00026568412],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017537241,0.0004628569,0.00085491524,0.0019859679,0.0007304467,0.00019034934,0.0037976576,0.00045351652,0.000047598394],"category_scores_gemma":[0.000103352664,0.000637413,0.00012751181,0.0016526298,0.00012143473,0.00092485314,0.0013750159,0.000931471,0.000004957707],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.095265105,0.0019051634,0.00033612497,0.016367964,0.0059385085,0.0152357705,0.017676307,0.35326448,0.40066737,0.012794467,0.079347484,0.001201271],"study_design_scores_gemma":[0.034629203,0.0026069772,0.00037482288,0.0022758893,0.0015701003,0.00005687789,0.13871635,0.076326296,0.08872288,0.000054290926,0.6503754,0.0042908587],"about_ca_topic_score_codex":0.0024570161,"about_ca_topic_score_gemma":0.0007589564,"teacher_disagreement_score":0.571028,"about_ca_system_score_codex":0.0023111093,"about_ca_system_score_gemma":0.00074861373,"threshold_uncertainty_score":0.99960774},"labels":[],"label_agreement":null},{"id":"W3195278387","doi":"10.2139/ssrn.3718227","title":"Asymmetric Demand Response when Prices Increase and Decrease: The Case of Child Healthcare","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Health care; Economics; Business; Monetary economics; Economic growth","score_opus":0.0061262080966269575,"score_gpt":0.20582620577548155,"score_spread":0.1996999976788546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195278387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93310994,0.043995447,0.008972367,0.012957444,0.00011548519,0.00020641228,0.0000057884326,0.00009394267,0.0005431489],"genre_scores_gemma":[0.9933033,0.0058501204,0.00011369922,0.00045893638,0.00021368537,0.0000059122517,0.0000012491171,0.00003047553,0.000022636092],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837714,0.00017179611,0.00027259265,0.00013963217,0.00013890438,0.0008999105],"domain_scores_gemma":[0.99931616,0.00016034557,0.00008075573,0.00016513301,0.00003875796,0.00023885183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015339664,0.00015250914,0.00017879224,0.00015314258,0.00017569688,0.00004027238,0.00020083383,0.00004577544,0.000012008494],"category_scores_gemma":[0.0002992142,0.000115112285,0.000057563575,0.0003882989,0.000035726276,0.00011803208,0.00006476521,0.0009193175,0.0000033022452],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008393371,0.0004422131,0.015727911,0.0017376845,0.0078044613,0.005165529,0.010889455,0.19066213,0.0013839223,0.37230814,0.024459347,0.36102584],"study_design_scores_gemma":[0.02126596,0.009453961,0.056117486,0.0008083592,0.002510773,0.14676017,0.036164757,0.30662936,0.0046211104,0.12526476,0.28545704,0.0049462807],"about_ca_topic_score_codex":0.00021184812,"about_ca_topic_score_gemma":0.0005751074,"teacher_disagreement_score":0.35607955,"about_ca_system_score_codex":0.00024258287,"about_ca_system_score_gemma":0.0002611854,"threshold_uncertainty_score":0.4694143},"labels":[],"label_agreement":null},{"id":"W3195393775","doi":"","title":"A Methodology to Forecast the Control Capacity and Control Payback of a Population of Thermostatically Controlled Appliances in a Demand-Side Management","year":2021,"lang":"en","type":"article","venue":"Research Portal (Queen's University Belfast)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Controllability; Payback period; Population; Demand response; Reliability (semiconductor); Control theory (sociology); Control (management); Grid; Estimation; Electric power system; Computer science; Renewable energy; Reliability engineering; Power (physics); Engineering; Electricity; Production (economics); Economics; Mathematics","score_opus":0.03371946690180831,"score_gpt":0.2730227702661493,"score_spread":0.23930330336434097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195393775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92092025,0.0000732203,0.06671942,0.0019048486,0.00007950981,0.0019371274,0.000060782164,0.000047215428,0.008257606],"genre_scores_gemma":[0.9974356,0.000111773086,0.002111892,0.000038732003,0.000016694708,0.000021809034,0.000008048745,0.000014848247,0.00024057012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9977392,0.0007749221,0.0003468473,0.0002696016,0.00046025167,0.00040917195],"domain_scores_gemma":[0.9983982,0.0009099068,0.00007018549,0.00030888664,0.00020054005,0.00011226696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017607665,0.00014983781,0.00054666225,0.00032956258,0.000078260855,0.000015288326,0.00023930783,0.00007230854,0.000051546525],"category_scores_gemma":[0.00019635491,0.00013000325,0.00009065489,0.00063251384,0.00016763598,0.00009917623,0.00015030071,0.00023024558,0.0000023734488],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007212437,0.0007326529,0.10204497,0.0022232493,0.005196987,0.0020305617,0.0034193585,0.51070666,0.00926535,0.34114906,0.0018326344,0.014186042],"study_design_scores_gemma":[0.038193893,0.0007340401,0.8505574,0.00045035224,0.0005799132,0.000017830478,0.012940457,0.083393976,0.0028321696,0.00528134,0.004191337,0.0008272779],"about_ca_topic_score_codex":0.0009381637,"about_ca_topic_score_gemma":0.00061685615,"teacher_disagreement_score":0.74851245,"about_ca_system_score_codex":0.00009464448,"about_ca_system_score_gemma":0.0000253302,"threshold_uncertainty_score":0.53013784},"labels":[],"label_agreement":null},{"id":"W3195895028","doi":"10.1109/tia.2021.3097293","title":"Planning Smart Grid Functions in Residential Loads Using a Virtual Equivalent Battery Storage Unit","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Fondation MAIF","keywords":"Smart grid; Transformer; Load management; Grid; Distribution transformer; Demand response; Energy storage; Automotive engineering; Energy management; Engineering; Reliability engineering; Computer science; Electrical engineering; Energy (signal processing); Power (physics); Voltage; Electricity","score_opus":0.03777236260565257,"score_gpt":0.26503480501509763,"score_spread":0.22726244240944507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195895028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17963703,0.000041632342,0.8162428,0.00018188833,0.0013941398,0.00027168042,0.00011696939,0.00035504714,0.0017588233],"genre_scores_gemma":[0.9967383,0.000013840292,0.00055997155,0.000103879334,0.0003891486,0.00067928643,0.000055138116,0.000071303104,0.0013891244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841285,0.00006454411,0.00043687806,0.00040990836,0.0002749206,0.00040088987],"domain_scores_gemma":[0.9990325,0.00009407865,0.000042554213,0.0006268713,0.00005965255,0.00014434666],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012961237,0.00026211244,0.00020844581,0.0004366845,0.0003081154,0.00008408118,0.000202343,0.00032959424,0.0005969812],"category_scores_gemma":[0.0000031490247,0.0003476306,0.00010190371,0.001233108,0.00005664574,0.0002448596,0.0000064442224,0.0011644406,0.000111215195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007937151,0.00016164986,0.00018067681,0.000022590573,0.00008874108,0.000028582603,0.00008184974,0.9930141,0.0040688375,0.00009075842,0.0014061253,0.0008481592],"study_design_scores_gemma":[0.004286785,0.00019996118,0.017505378,0.0008327622,0.00086906063,0.00032589372,0.006612992,0.6940263,0.10246301,0.00024275498,0.16938594,0.003249171],"about_ca_topic_score_codex":0.00007030589,"about_ca_topic_score_gemma":0.00012129674,"teacher_disagreement_score":0.8171013,"about_ca_system_score_codex":0.0003563321,"about_ca_system_score_gemma":0.00010063105,"threshold_uncertainty_score":0.9998976},"labels":[],"label_agreement":null},{"id":"W3196945518","doi":"10.1109/tsg.2021.3110889","title":"Peer-to-Peer Energy Trading Enabled Optimal Decentralized Operation of Smart Distribution Grids","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Ministry of Education - Singapore; National Research Foundation Singapore","keywords":"Prosumer; Energy market; Smart grid; Distributed generation; Peer-to-peer; Scalability; Market clearing; Computer science; Market mechanism; Grid; Anonymity; Distributed computing; Microeconomics; Computer security; Economics; Renewable energy; Engineering","score_opus":0.011759027231500085,"score_gpt":0.2192699632883007,"score_spread":0.20751093605680063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196945518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078170516,0.00005995431,0.91347986,0.0009000767,0.0054610483,0.00018356802,0.0002486943,0.0003804213,0.001115866],"genre_scores_gemma":[0.99385136,0.00013966463,0.0025988137,0.00013560339,0.0002433555,0.0001514407,0.0003183738,0.00007751019,0.0024838676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9976546,0.000087942135,0.00056908274,0.00042979408,0.00074837124,0.00051021704],"domain_scores_gemma":[0.998802,0.00007528479,0.000043281714,0.0005023371,0.00035270266,0.00022438602],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003019771,0.00034410798,0.00039239967,0.0002093819,0.00018721315,0.000091753944,0.0002006256,0.00015222814,0.0005557413],"category_scores_gemma":[0.000022347922,0.00039331365,0.00022762628,0.0007145822,0.000035753405,0.00029140923,0.000004101336,0.00023897586,0.00005361478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007805333,0.00016945903,0.000025073468,0.000043547378,0.00021898707,0.000020834404,0.00017751659,0.95779455,0.018516634,0.00034163328,0.019357393,0.003256309],"study_design_scores_gemma":[0.001115485,0.00012638069,0.00034985924,0.00006083015,0.0001431061,0.000021005253,0.00011945267,0.17663191,0.6234569,0.000012450503,0.19750413,0.00045846024],"about_ca_topic_score_codex":0.000113079346,"about_ca_topic_score_gemma":0.00025298976,"teacher_disagreement_score":0.9156809,"about_ca_system_score_codex":0.00034910775,"about_ca_system_score_gemma":0.000060550108,"threshold_uncertainty_score":0.9998519},"labels":[],"label_agreement":null},{"id":"W3200592846","doi":"10.1007/978-3-030-57442-0","title":"Mathematical Optimization for Efficient and Robust Energy Networks","year":2021,"lang":"en","type":"book","venue":"AIRO Springer series/AIRO Springer Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Robust optimization; Mathematical optimization; Computer science; Set (abstract data type); Energy (signal processing); Work (physics); Optimization problem; Mathematics; Engineering; Mechanical engineering","score_opus":0.008297438189911386,"score_gpt":0.17382550683243178,"score_spread":0.1655280686425204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200592846","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00047757282,0.009325567,0.86919576,0.00045586145,0.005768349,0.001324921,0.000078499725,0.0024849735,0.1108885],"genre_scores_gemma":[0.0064926413,0.014597128,0.19586307,0.00064310187,0.007399626,0.0026972787,0.0015923772,0.00293674,0.76777804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99571985,0.000050083887,0.0011392315,0.0012723067,0.00061346585,0.0012050545],"domain_scores_gemma":[0.99759334,0.0001769171,0.00025842575,0.001378234,0.00022919543,0.00036390187],"candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.00033810467,0.0013873074,0.0014106081,0.00039509195,0.00035159447,0.00047191975,0.00057464634,0.00088457245,0.00042462634],"category_scores_gemma":[0.00007277095,0.0015762934,0.00039884943,0.00029604975,0.00032329958,0.00048763558,0.0008198942,0.0005943751,0.000017568746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006594293,0.00005173685,0.000009435478,0.0012871439,0.0005398657,0.000058932917,0.00017840612,0.9294565,0.000023133467,0.054482028,0.012691757,0.0011551344],"study_design_scores_gemma":[0.00075406366,0.00017292543,0.00007920204,0.0009016812,0.0004926031,0.000082213446,0.00012472249,0.49611214,0.0006400289,0.00073992956,0.4977255,0.0021749896],"about_ca_topic_score_codex":0.000010281495,"about_ca_topic_score_gemma":0.000095851734,"teacher_disagreement_score":0.6733327,"about_ca_system_score_codex":0.00055071997,"about_ca_system_score_gemma":0.00013312169,"threshold_uncertainty_score":0.99988776},"labels":[],"label_agreement":null},{"id":"W3200780914","doi":"10.1109/sege52446.2021.9535058","title":"Design of a Smart Controller Agent for Demand-Side Management with Low Payback Effect","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Demand response; Computer science; Smart grid; Controller (irrigation); Renewable energy; Grid; Electric power system; Plug-in; Automatic Generation Control; Demand side; Simulation; Automotive engineering; Control engineering; Electricity; Power (physics); Engineering","score_opus":0.007312486505106639,"score_gpt":0.18937647032060986,"score_spread":0.18206398381550323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200780914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066129914,0.0002442291,0.9793768,0.00005779672,0.00025643376,0.000959689,0.0000019842728,0.00019680659,0.012293256],"genre_scores_gemma":[0.9487295,0.0001298809,0.044870984,0.0002393684,0.00007128547,0.00077576813,0.000014226456,0.00008743576,0.0050815158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990256,0.000044436674,0.0002327649,0.00022395016,0.00018861979,0.0002846572],"domain_scores_gemma":[0.99942464,0.00015799222,0.000027410762,0.00029526372,0.00004523102,0.0000494368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002677779,0.00019850016,0.00031289423,0.000071366245,0.000027823578,0.000024237905,0.00010982524,0.000036511767,0.000090742],"category_scores_gemma":[0.00000938857,0.00015436593,0.000084774525,0.00016398613,0.00001604459,0.00005077822,0.00004755916,0.000041397037,0.000024959809],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016737584,0.000043251173,0.00014796336,0.0006610223,0.00096256915,0.000049321745,0.000025088111,0.9807713,0.0010706319,0.0017791779,0.011547946,0.0027743333],"study_design_scores_gemma":[0.011499657,0.00083937636,0.0027454447,0.00032598863,0.0007012642,0.000012706449,0.00012408016,0.7337159,0.21842225,0.00021491488,0.03060577,0.0007926838],"about_ca_topic_score_codex":0.0000035082821,"about_ca_topic_score_gemma":0.0000133099575,"teacher_disagreement_score":0.94211656,"about_ca_system_score_codex":0.00005940052,"about_ca_system_score_gemma":0.000006924487,"threshold_uncertainty_score":0.629486},"labels":[],"label_agreement":null},{"id":"W3200977970","doi":"10.1109/tsmc.2021.3111135","title":"Demand–Response Games for Peer-to-Peer Energy Trading With the Hyperledger Blockchain","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Systems Man and Cybernetics Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Norges Forskningsråd","keywords":"Smart contract; Demand response; Blockchain; Computer science; Provisioning; Renewable energy; Peer-to-peer; Efficient energy use; Environmental economics; Distributed computing; Computer security; Computer network; Electricity; Economics; Engineering","score_opus":0.010341657554395357,"score_gpt":0.19733191930477614,"score_spread":0.18699026175038078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200977970","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12491463,0.0012737485,0.8669659,0.0008379129,0.0032241973,0.00071248994,0.00006440066,0.00031721249,0.0016895111],"genre_scores_gemma":[0.96081996,0.000032340664,0.000120295335,0.000087348395,0.0002788228,0.0008360438,0.0000043021846,0.000109718545,0.03771119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980179,0.00020297818,0.00039240258,0.0004086602,0.000547525,0.00043050273],"domain_scores_gemma":[0.99863905,0.0003500367,0.0000514695,0.00052514835,0.00024180145,0.00019247564],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00067886774,0.00035470762,0.00040590443,0.00019231188,0.00024433588,0.00030961956,0.000189493,0.00012544918,0.000008110181],"category_scores_gemma":[0.000008087303,0.00027432627,0.000103493374,0.00033044617,0.000045299388,0.00004206785,0.0000027625501,0.00015731997,0.000012957395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011724743,0.00004280622,0.000005886623,0.0002446374,0.0003692216,0.000024779598,0.0010413706,0.9833483,0.0022345763,0.00092352595,0.010962947,0.0006847107],"study_design_scores_gemma":[0.0012387346,0.00028328015,0.00007139477,0.0003983778,0.00024081398,0.00025826134,0.004707461,0.54134196,0.008011325,0.000005744386,0.44276482,0.0006778122],"about_ca_topic_score_codex":0.000093485505,"about_ca_topic_score_gemma":0.00015875245,"teacher_disagreement_score":0.8668456,"about_ca_system_score_codex":0.00013245178,"about_ca_system_score_gemma":0.00002991932,"threshold_uncertainty_score":0.9999709},"labels":[],"label_agreement":null},{"id":"W3201127604","doi":"10.1016/j.ijepes.2021.107553","title":"Two-stage framework for optimizing the operation of remote off-grid power systems under uncertainties","year":2021,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Computer science; Grid; Reliability engineering; Renewable energy; Process (computing); Electric power system; Stochastic optimization; Mathematical optimization; Stochastic programming; Power (physics); Engineering","score_opus":0.013215423294427662,"score_gpt":0.25682243139469985,"score_spread":0.2436070081002722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201127604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066927094,0.009777683,0.9656489,0.0005436201,0.014542427,0.00012818593,0.000016688235,0.000048053298,0.0026017528],"genre_scores_gemma":[0.9945192,0.00047324513,0.0029918356,0.0001608055,0.0010741806,0.000012425761,0.000014309884,0.000054181924,0.00069982634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99746644,0.000137825,0.0010400553,0.0001862413,0.0008755735,0.0002938679],"domain_scores_gemma":[0.99774057,0.00046671182,0.000388285,0.00026981338,0.0010480476,0.00008657663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005677086,0.0002254494,0.00042192277,0.00026414986,0.000063785534,0.00023581233,0.00059924135,0.00012425249,0.000033410623],"category_scores_gemma":[0.00020886809,0.00017390063,0.00026023856,0.00028845272,0.000036298963,0.00023458904,0.000062807376,0.00028633553,0.0000022264517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005129992,0.000032496308,0.000015430214,0.000015331392,0.0007397892,0.000034606892,0.00007735723,0.8133766,0.001539351,0.18116131,0.0027269728,0.00022945958],"study_design_scores_gemma":[0.0011849478,0.00023851868,0.00008195987,0.0005268492,0.00009810901,0.0003254851,0.001110171,0.8031449,0.006412401,0.0010314798,0.18545589,0.00038931123],"about_ca_topic_score_codex":0.00012456167,"about_ca_topic_score_gemma":0.000010694037,"teacher_disagreement_score":0.98782647,"about_ca_system_score_codex":0.0004231235,"about_ca_system_score_gemma":0.00011105932,"threshold_uncertainty_score":0.7091462},"labels":[],"label_agreement":null},{"id":"W3201239977","doi":"10.1016/j.egyr.2021.08.190","title":"Design and implementation of an open-Source IoT and blockchain-based peer-to-peer energy trading platform using ESP32-S2, Node-Red and, MQTT protocol","year":2021,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Memorial University of Newfoundland","funders":"Iran University of Science and Technology; Higher Education Commission, Pakistan","keywords":"MQTT; Computer science; Message queue; Computer network; Node (physics); Hypertext Transfer Protocol; The Internet; Embedded system; Operating system; Internet of Things; Engineering","score_opus":0.024175572657001095,"score_gpt":0.2786940365879395,"score_spread":0.2545184639309384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201239977","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8679524,0.000046213318,0.12666738,0.00015289876,0.00021545366,0.004270573,0.0000036458366,0.00017661758,0.0005148277],"genre_scores_gemma":[0.9622132,0.0000018700998,0.03212112,0.00015645924,0.00009862417,0.0049026413,0.00003293591,0.00010109205,0.00037206282],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808645,0.000055630844,0.00059474644,0.0005148576,0.00041270556,0.00033562924],"domain_scores_gemma":[0.9990275,0.000050658637,0.00016527818,0.00040684053,0.00013669305,0.00021303141],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00059954467,0.0002866498,0.00035216508,0.00020437376,0.0001303048,0.0001592427,0.00009881495,0.00009183253,0.000048735208],"category_scores_gemma":[0.000034069955,0.00031575473,0.000027544353,0.00028577575,0.00003200403,0.000114390044,0.0001747653,0.00006840557,5.3091792e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056767993,0.00005467861,0.0011373903,0.00011700195,0.00012763085,0.00039457376,0.0004414361,0.93060875,0.04106706,0.0002846762,0.00042510324,0.02528495],"study_design_scores_gemma":[0.0014991369,0.00019638441,0.001181241,0.00010000853,0.00007339106,0.0003531803,0.00034465402,0.65689,0.2959359,0.00018795463,0.04269854,0.00053966494],"about_ca_topic_score_codex":0.00083938095,"about_ca_topic_score_gemma":0.00039861005,"teacher_disagreement_score":0.27371877,"about_ca_system_score_codex":0.000095210904,"about_ca_system_score_gemma":0.00007284265,"threshold_uncertainty_score":0.9999294},"labels":[],"label_agreement":null},{"id":"W3201912498","doi":"10.1016/j.energy.2021.122124","title":"Multi-objective optimization design and multi-attribute decision-making method of a distributed energy system based on nearly zero-energy community load forecasting","year":2021,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Key Research and Development Program of China; Ministry of Science and Technology of the People's Republic of China","keywords":"Zero-energy building; Computer science; Mathematical optimization; TOPSIS; Photovoltaic system; Energy (signal processing); Cluster analysis; Distributed generation; Monte Carlo method; Load profile; Solar energy; Entropy (arrow of time); Independence (probability theory); Renewable energy; Engineering; Operations research; Artificial intelligence; Mathematics; Electricity","score_opus":0.029529097739205222,"score_gpt":0.24588832862883803,"score_spread":0.2163592308896328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201912498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009316739,0.00035117645,0.99748814,0.000009919218,0.00048240912,0.00007501051,0.00006013702,0.0003608221,0.00024071021],"genre_scores_gemma":[0.601485,0.000032711614,0.3981037,0.000054266453,0.00004056101,0.00006131838,0.00012253586,0.00007211732,0.000027761367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970632,0.0009471562,0.00063001865,0.00044388865,0.0004460415,0.00046965887],"domain_scores_gemma":[0.9967062,0.0018289312,0.000196766,0.0007338667,0.00039160484,0.00014262371],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000768506,0.00044027323,0.0005857685,0.0002691704,0.00031006843,0.00010044077,0.00029793644,0.00021593636,0.000014031102],"category_scores_gemma":[0.0005063688,0.0004767508,0.00013625315,0.0008840033,0.000049808616,0.00019196603,0.00023529309,0.00023313928,5.527745e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060395847,0.00013406062,0.000056258643,0.00007715396,0.00017846432,0.00006197546,0.000108980494,0.9846739,0.0007283268,0.0011564441,0.00016486495,0.012599143],"study_design_scores_gemma":[0.00141607,0.00009212778,0.00024652475,0.00057695084,0.00007807285,0.000022156783,0.0002766888,0.98093563,0.015374017,0.000033802644,0.00053638575,0.00041154132],"about_ca_topic_score_codex":0.0011720452,"about_ca_topic_score_gemma":0.0003673366,"teacher_disagreement_score":0.60055333,"about_ca_system_score_codex":0.0006232011,"about_ca_system_score_gemma":0.00009656633,"threshold_uncertainty_score":0.99976844},"labels":[],"label_agreement":null},{"id":"W3202441821","doi":"10.1016/j.apenergy.2021.117836","title":"Demand response in buildings: Unlocking energy flexibility through district-level electro-thermal simulation","year":2021,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"Horizon 2020; Horizon 2020 Framework Programme; European Commission","keywords":"Flexibility (engineering); Electricity; Demand response; Tariff; Peak demand; Load shifting; Environmental economics; Grid; Energy consumption; Consumption (sociology); Efficient energy use; Photovoltaics; Computer science; Engineering; Photovoltaic system; Business; Economics; Electrical engineering","score_opus":0.01826605726636976,"score_gpt":0.23344553206423216,"score_spread":0.2151794747978624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202441821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50383115,0.00036529367,0.47952172,0.00007726929,0.0002686399,0.000057878344,0.0000046228624,0.00043102392,0.015442374],"genre_scores_gemma":[0.9971716,0.00009369938,0.001756267,0.0003082881,0.00019854029,0.000089902074,0.00007349661,0.00007891506,0.00022931954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980855,0.000096837175,0.00044963826,0.00051227806,0.0002908561,0.00056490756],"domain_scores_gemma":[0.99901,0.00027185172,0.0000513262,0.00055168435,0.000040265604,0.00007482306],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026836985,0.00031330864,0.00030803666,0.00013740432,0.00008407904,0.000060176175,0.00021181801,0.00016428361,0.00007537509],"category_scores_gemma":[0.00004411947,0.00036709977,0.00007811528,0.0008193165,0.0000337555,0.00015922256,0.00012232746,0.00015353267,0.00000748912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017469261,0.00005567822,0.00007022079,0.000016952634,0.00005582956,0.00003330656,0.0000944939,0.9173608,0.033224914,0.04447097,0.00022769862,0.0042144484],"study_design_scores_gemma":[0.001360598,0.000044852855,0.005973691,0.000034365647,0.00003851099,0.000005022865,0.00009027925,0.50827676,0.3068295,0.0049271723,0.1715813,0.0008379203],"about_ca_topic_score_codex":0.00017324966,"about_ca_topic_score_gemma":0.00014941054,"teacher_disagreement_score":0.4933404,"about_ca_system_score_codex":0.00041374427,"about_ca_system_score_gemma":0.0000438721,"threshold_uncertainty_score":0.9998781},"labels":[],"label_agreement":null},{"id":"W3204456588","doi":"10.1109/globecom46510.2021.9685380","title":"Smart Home Energy Management: Sequence-to-Sequence Load Forecasting and Q-Learning","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Global Communications Conference (GLOBECOM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sequence (biology); Computer science; Energy management; Energy (signal processing); Artificial intelligence","score_opus":0.06126184037318961,"score_gpt":0.26291518502803163,"score_spread":0.20165334465484203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204456588","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16451363,0.0060046082,0.13765389,0.0041865455,0.0027293898,0.00080455106,0.00023771147,0.002043498,0.6818262],"genre_scores_gemma":[0.9679483,0.0047405586,0.025316458,0.0003343657,0.000066564346,0.00016455687,0.00013352794,0.000040638497,0.0012550395],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976765,0.00024635202,0.00050886854,0.000541164,0.00040139968,0.00062573625],"domain_scores_gemma":[0.99720865,0.00013330534,0.00008386459,0.001961323,0.0003374225,0.0002754125],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035090966,0.00038606735,0.00036943716,0.00011412742,0.0004929102,0.0003577676,0.001270616,0.000117884425,0.00018444083],"category_scores_gemma":[0.000095496114,0.00048025497,0.00008830177,0.0011926738,0.00016722926,0.00033573664,0.0012232811,0.0003975971,0.00015629084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002742433,0.00024343355,0.009100175,0.00039999784,0.0010260089,0.00041474635,0.00083506806,0.18207768,0.003151424,0.3868724,0.010147666,0.40570396],"study_design_scores_gemma":[0.0010241034,0.000079445665,0.005964406,0.0006499048,0.00020998,0.00019014195,0.0016432806,0.5199021,0.00070995744,0.004898922,0.46309063,0.0016370836],"about_ca_topic_score_codex":0.00044142816,"about_ca_topic_score_gemma":0.0019245956,"teacher_disagreement_score":0.80343467,"about_ca_system_score_codex":0.00060827495,"about_ca_system_score_gemma":0.00012546887,"threshold_uncertainty_score":0.9997649},"labels":[],"label_agreement":null},{"id":"W3204560711","doi":"10.1109/jiot.2021.3117924","title":"Blockchain-Based Trustworthy Energy Dispatching Approach for High Renewable Energy Penetrated Power Systems","year":2021,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Blockchain; Computer science; Renewable energy; Trustworthiness; Energy (signal processing); Power (physics); Energy exchange; Computer network; Computer security; Electrical engineering; Engineering","score_opus":0.008046554073743953,"score_gpt":0.1883541994840122,"score_spread":0.18030764541026822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204560711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.079034366,0.0011473575,0.9102716,0.00005159582,0.0045471024,0.000068231544,0.000008055924,0.0001737362,0.004697939],"genre_scores_gemma":[0.98860455,0.000038008555,0.0075459043,0.00021289007,0.0003935507,0.000041149564,0.000031273677,0.000113726615,0.0030189236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780524,0.00009429315,0.0007866299,0.0003231189,0.00046627034,0.0005244699],"domain_scores_gemma":[0.998805,0.00011412079,0.00026790306,0.00034939146,0.0002774307,0.00018619285],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045552425,0.00034751996,0.00051754917,0.00028292113,0.00008131013,0.00022242156,0.00049549376,0.0001661119,0.00008020045],"category_scores_gemma":[0.000039896935,0.0003445668,0.00026085347,0.00026804593,0.000033661516,0.00012545323,0.000052968986,0.00026934693,8.884765e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005086974,0.00008352182,0.00007516068,0.0001256646,0.00043442126,0.00006452612,0.00015803252,0.97424597,0.0068073897,0.0015418854,0.016077656,0.00033487938],"study_design_scores_gemma":[0.000998626,0.00010907553,0.000024059826,0.0002439338,0.00008125765,0.00014157231,0.00017082345,0.89694077,0.088632315,0.00023288239,0.012045468,0.00037923062],"about_ca_topic_score_codex":0.0019184158,"about_ca_topic_score_gemma":0.00008124105,"teacher_disagreement_score":0.9095702,"about_ca_system_score_codex":0.000233099,"about_ca_system_score_gemma":0.00007254254,"threshold_uncertainty_score":0.99990064},"labels":[],"label_agreement":null},{"id":"W3205928330","doi":"10.1002/2050-7038.13168","title":"Probabilistic integrated framework for <scp>AC</scp> / <scp>DC</scp> transmission congestion management considering system expansion, demand response, and renewable energy sources and load uncertainties","year":2021,"lang":"en","type":"article","venue":"International Transactions on Electrical Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Demand response; Renewable energy; Computer science; Scheduling (production processes); Electric power system; Mathematical optimization; Load management; Economic dispatch; Reliability engineering; Engineering; Power (physics); Electricity; Electrical engineering","score_opus":0.009665785317898652,"score_gpt":0.20792333101956725,"score_spread":0.1982575457016686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205928330","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018968975,0.003693337,0.9735073,0.00010213751,0.0014256567,0.00029411566,0.000034670928,0.00053231115,0.0014415125],"genre_scores_gemma":[0.98735833,0.0016207304,0.0032805423,0.000073850664,0.00016843968,0.00071919506,0.000054053493,0.00009650143,0.00662835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972703,0.00024274568,0.0006886525,0.0006888168,0.00061260257,0.0004969082],"domain_scores_gemma":[0.99676335,0.00224816,0.00011520868,0.0002940203,0.0003527257,0.0002265525],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004251099,0.00044800522,0.0004695852,0.00047190904,0.00028851413,0.00030719102,0.00020528238,0.00029598776,0.0000056145923],"category_scores_gemma":[0.00026114626,0.000446172,0.00012500958,0.00055569544,0.00008158163,0.00020085326,0.000014937852,0.0002417189,0.0000017803518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008665488,0.00009164031,0.000018103266,0.00037525457,0.00064345513,0.0000513693,0.00020415953,0.9788028,0.0007883444,0.014380096,0.0011026836,0.003455455],"study_design_scores_gemma":[0.0010421732,0.0001858015,0.00014098515,0.0010359907,0.00018074545,0.00016454278,0.001614284,0.8705791,0.008913036,0.0015308791,0.11443061,0.00018185006],"about_ca_topic_score_codex":0.0004360329,"about_ca_topic_score_gemma":0.00010691982,"teacher_disagreement_score":0.97022676,"about_ca_system_score_codex":0.00068027514,"about_ca_system_score_gemma":0.0000843995,"threshold_uncertainty_score":0.999799},"labels":[],"label_agreement":null},{"id":"W3206656095","doi":"10.5267/j.ijiec.2021.7.002","title":"Integrated modeling of the peer-to-peer markets in the energy industry","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Smart grid; Isolation (microbiology); Grid; Decomposition; Integer programming; Industrial engineering; Mathematical optimization; Scale (ratio); Linear programming; Operations research; Electricity; Distributed computing; Engineering; Mathematics; Algorithm","score_opus":0.0256908840809342,"score_gpt":0.24107197652037834,"score_spread":0.21538109243944414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206656095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6524521,0.000114551716,0.32677063,0.009071112,0.010061157,0.0001183886,0.000031772066,0.00005149914,0.0013287913],"genre_scores_gemma":[0.9976737,0.0000070644246,0.001439065,0.00012800071,0.00063931517,0.0000055109804,0.000010445005,0.000020610507,0.00007632087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982385,0.00006249022,0.0006068401,0.00008493815,0.000864975,0.00014225242],"domain_scores_gemma":[0.9986496,0.00019250979,0.00009030187,0.00015118938,0.00086714036,0.00004923907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005305158,0.00013123089,0.00016894253,0.00033294797,0.00002299568,0.00007421174,0.0006768126,0.00013054155,0.000024897661],"category_scores_gemma":[0.0007769281,0.000098745164,0.000117450014,0.0007013936,0.00001197912,0.00012393389,0.0000856749,0.0007346663,9.742114e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008847188,0.00003146526,0.00021685075,0.0000024465526,0.0001519215,0.0000351921,0.00021559006,0.99210584,0.00028015077,0.0014449852,0.003878328,0.001628386],"study_design_scores_gemma":[0.00062781887,0.000012855179,0.0011229541,0.00024378889,0.000023707347,0.0000903625,0.00033272462,0.9795832,0.0010635717,0.00012072596,0.016666526,0.000111759655],"about_ca_topic_score_codex":0.00003608109,"about_ca_topic_score_gemma":0.000015235551,"teacher_disagreement_score":0.34522158,"about_ca_system_score_codex":0.00019171662,"about_ca_system_score_gemma":0.00012762228,"threshold_uncertainty_score":0.4026711},"labels":[],"label_agreement":null},{"id":"W3207692912","doi":"10.1016/j.apenergy.2022.120500","title":"Multi-agent hierarchical reinforcement learning for energy management","year":2022,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Trottier Institute for Sustainability in Engineering and Design","keywords":"Reinforcement learning; Computer science; Scheduling (production processes); Novelty; Energy management; Control engineering; Efficient energy use; Distributed computing; Energy (signal processing); Artificial intelligence; Engineering","score_opus":0.010145179155417327,"score_gpt":0.1966193987083418,"score_spread":0.18647421955292448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207692912","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009450855,0.00016246372,0.9319738,0.00007351704,0.001110984,0.00024471758,0.0000033902948,0.00088646385,0.06459959],"genre_scores_gemma":[0.9769133,0.00019717545,0.0073293326,0.0005964167,0.00023213773,0.00440876,0.00028787242,0.00013845388,0.009896582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980832,0.000029502815,0.0003850509,0.00043388456,0.00043346043,0.00063491607],"domain_scores_gemma":[0.99933773,0.00004659003,0.00005127517,0.00041943067,0.0000128499105,0.0001321449],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019213175,0.00031236335,0.00024809188,0.00026196314,0.00039730335,0.00003854888,0.00041877938,0.000048733258,0.00031868648],"category_scores_gemma":[0.0000022812,0.00037013766,0.00012939896,0.0003048204,0.000027008493,0.000040712188,0.0005254107,0.00018502196,0.000012765765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029277313,0.000049629954,0.0000032295004,0.000034048306,0.0001995473,0.000010652525,0.000052909778,0.7703685,0.0006329614,0.20399453,0.009304734,0.015319989],"study_design_scores_gemma":[0.00084191887,0.00005520502,0.000031637588,0.000002561407,0.000030661577,0.0000015689607,0.00010616741,0.3688627,0.0011588547,0.00033004957,0.6282829,0.0002957623],"about_ca_topic_score_codex":0.000046298894,"about_ca_topic_score_gemma":0.000015468839,"teacher_disagreement_score":0.9759682,"about_ca_system_score_codex":0.00039958197,"about_ca_system_score_gemma":0.00000882328,"threshold_uncertainty_score":0.99987507},"labels":[],"label_agreement":null},{"id":"W3208682347","doi":"10.1007/s40095-021-00443-8","title":"Optimal scheduling of residential building energy system under B2G, G2B and B2B operation modes","year":2021,"lang":"en","type":"article","venue":"International journal of energy and environmental engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Renewable energy; Grid; Schedule; Tariff; Scheduling (production processes); Electricity; Profit (economics); Electric power system; Computer science; Engineering; Power (physics); Operations management; Business; Electrical engineering; Operating system","score_opus":0.003859337921211499,"score_gpt":0.17296526952817187,"score_spread":0.16910593160696039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208682347","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6426962,0.0017056797,0.35483596,0.000027376507,0.0005862806,0.000006965325,0.000003845534,0.000017631515,0.00012006292],"genre_scores_gemma":[0.98949003,0.0012582159,0.008871418,0.000014491757,0.00030125128,0.0000019292268,0.000010725499,0.000024946265,0.000026978392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991433,0.000012817323,0.0003503932,0.000110293615,0.00026898022,0.00011422751],"domain_scores_gemma":[0.99974847,0.00003103142,0.00006804959,0.00006616698,0.000020116973,0.000066187495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000090462876,0.00013229248,0.0001672362,0.00015895224,0.000026040134,0.000049248458,0.00010603299,0.00005422815,0.00001600446],"category_scores_gemma":[0.00000713051,0.00014423643,0.000053194628,0.0000368634,0.000022706958,0.00028896984,0.00009750488,0.00007340664,1.4493993e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011155986,0.000011726976,0.0000989923,0.000020905938,0.00023630209,0.000054688175,0.000024841023,0.8485716,0.13894746,0.011295664,0.000008086906,0.0007185767],"study_design_scores_gemma":[0.0004910499,0.000024124281,0.0010315707,0.00017031716,0.00003868051,0.00035289678,0.0003073851,0.86346835,0.13309263,0.000027352973,0.0008418656,0.00015380915],"about_ca_topic_score_codex":0.000016006325,"about_ca_topic_score_gemma":0.0000038488943,"teacher_disagreement_score":0.34679383,"about_ca_system_score_codex":0.00013705553,"about_ca_system_score_gemma":0.0000075965127,"threshold_uncertainty_score":0.5881791},"labels":[],"label_agreement":null},{"id":"W3208684372","doi":"10.1109/ccece53047.2021.9569169","title":"Design and Development of an Intelligent Tool for Retail Electric Provider Plan Selection","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Battery (electricity); Photovoltaic system; Plug-in; Computer science; Software; Energy consumption; Environmental economics; Engineering; Electrical engineering; Operating system","score_opus":0.029018529794287453,"score_gpt":0.21244389510753436,"score_spread":0.1834253653132469,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208684372","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13240634,0.00007806452,0.86679554,0.00001096903,0.00008417204,0.00021246156,1.4938087e-7,0.00011338788,0.00029888932],"genre_scores_gemma":[0.5380097,0.000039255923,0.46092102,0.000039368864,0.00005177914,0.00015297519,0.000018777557,0.000034265267,0.00073288043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99948204,0.000013365881,0.00016953668,0.00012801026,0.0000736933,0.0001333832],"domain_scores_gemma":[0.99980956,0.000030908348,0.000013007907,0.00007657946,0.000042901407,0.00002703115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014172678,0.00007976931,0.00008824323,0.000062214436,0.00002925546,0.00001810171,0.000035628454,0.000030675907,0.000045278346],"category_scores_gemma":[0.000013075897,0.00007933288,0.000010676987,0.00013167289,0.0000029190678,0.00007077172,0.000014168926,0.000030588853,0.0000021214582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050307524,0.00009042167,0.0004332621,0.00039917778,0.0002890056,0.0000034341354,0.0006834031,0.6192851,0.08247873,0.001571174,0.002249904,0.29246604],"study_design_scores_gemma":[0.00014091321,0.000048292186,0.0006520271,0.0000063747534,0.000010822749,0.0000036995787,0.000046738533,0.297514,0.6886335,0.000052266296,0.012778031,0.000113346025],"about_ca_topic_score_codex":0.0000017952482,"about_ca_topic_score_gemma":0.00002422733,"teacher_disagreement_score":0.6061548,"about_ca_system_score_codex":0.00006438392,"about_ca_system_score_gemma":0.00003947915,"threshold_uncertainty_score":0.32351008},"labels":[],"label_agreement":null},{"id":"W3208843793","doi":"10.1109/ccece53047.2021.9569086","title":"A New Approach to Design New Orthogonal Wavelets Using Unsupervised Clustering Applied to Nonintrusive Load Monitoring","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wavelet; Cluster analysis; Pattern recognition (psychology); Computer science; Artificial intelligence; Orthogonal wavelet; Discrete wavelet transform; Wavelet transform; Fast wavelet transform","score_opus":0.04454147722452254,"score_gpt":0.23497379215140748,"score_spread":0.19043231492688495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208843793","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015636455,0.000054638367,0.9427018,0.00008133534,0.0008857233,0.00042891433,9.985656e-7,0.00047215226,0.039737992],"genre_scores_gemma":[0.21970612,0.000008318815,0.7762638,0.00026013755,0.0011914806,0.000042935564,0.0000042501797,0.00012155978,0.0024014302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979732,0.000023189927,0.000340834,0.0005656694,0.00045480387,0.00064227986],"domain_scores_gemma":[0.9987455,0.000044065295,0.00001827066,0.0005194532,0.00006597363,0.0006067478],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016268884,0.00036093616,0.00033687812,0.00017904153,0.00008662632,0.00017464347,0.0002969324,0.00009294897,0.00027057814],"category_scores_gemma":[0.000026889968,0.0004124099,0.000074977776,0.0008060808,0.000004799691,0.00012348148,0.00038652148,0.00016108602,0.0001904055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022214464,0.000014330626,0.000032661646,0.00004046897,0.00010949538,0.000027156726,0.00071270287,0.9430391,0.032510214,0.0004179256,0.0029369423,0.02013679],"study_design_scores_gemma":[0.0016880748,0.000038758073,0.0014340112,0.00016648667,0.00011348122,0.000053599975,0.0010542192,0.8206435,0.15745255,0.00009505817,0.01571178,0.0015485105],"about_ca_topic_score_codex":0.00014204334,"about_ca_topic_score_gemma":0.000031821754,"teacher_disagreement_score":0.20406966,"about_ca_system_score_codex":0.0005463347,"about_ca_system_score_gemma":0.0002202596,"threshold_uncertainty_score":0.99983275},"labels":[],"label_agreement":null},{"id":"W3210905397","doi":"10.1016/j.epsr.2022.108375","title":"Batch reinforcement learning for network-safe demand response in unknown electric grids","year":2022,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada; Advanced Research Projects Agency - Energy; Institut de Valorisation des Données; National Science Foundation","keywords":"Demand response; Reinforcement learning; Reinforcement; Computer science; Artificial intelligence; Engineering; Electricity; Electrical engineering; Structural engineering","score_opus":0.021160563738685984,"score_gpt":0.27696394801232826,"score_spread":0.2558033842736423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210905397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7456158,0.03067751,0.16588588,0.0006372921,0.006587102,0.008833735,0.000005312759,0.001435977,0.04032141],"genre_scores_gemma":[0.98490995,0.00023440618,0.00003105221,0.000020071364,0.00026540135,0.0030532544,0.000020842594,0.00011826815,0.011346776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99366003,0.0015739147,0.0007127324,0.0005443706,0.0014547819,0.002054148],"domain_scores_gemma":[0.998042,0.00102443,0.000065240696,0.00054386625,0.0001520477,0.00017243455],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.011827084,0.00029263197,0.00042607763,0.0017104101,0.00066198705,0.00014270446,0.00069433,0.00010769041,0.00013352511],"category_scores_gemma":[0.00042227382,0.00033024148,0.00010504727,0.0050999774,0.000018075023,0.00013270353,0.00030984177,0.0014513114,0.000052784206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007011288,0.00003394813,0.00030890177,0.00010034968,0.00009429935,0.000052144616,0.00020354951,0.947875,0.0023636397,0.0010981138,0.046772383,0.00039653655],"study_design_scores_gemma":[0.0008217804,0.0010095597,0.0010375571,0.000028804625,0.000006488746,0.000017283162,0.000112799724,0.64683014,0.0002738431,0.000034749304,0.3495376,0.0002893583],"about_ca_topic_score_codex":0.00018431182,"about_ca_topic_score_gemma":0.00001306535,"teacher_disagreement_score":0.30276522,"about_ca_system_score_codex":0.0024616946,"about_ca_system_score_gemma":0.00021006445,"threshold_uncertainty_score":0.99991494},"labels":[],"label_agreement":null},{"id":"W3211458314","doi":"10.18280/mmep.080510","title":"Cloud-Based Automated Power Factor Correction and Power Monitoring","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cloud computing; Power factor; Computer science; Reliability engineering; Artificial neural network; Embedded system; Real-time computing; Electrical engineering; Engineering; Operating system; Artificial intelligence","score_opus":0.014551359783946564,"score_gpt":0.19710952607962437,"score_spread":0.1825581662956778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211458314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32105914,0.0006614156,0.67481303,0.000028915463,0.0010632074,0.000093014925,0.0000017664299,0.00175611,0.00052337826],"genre_scores_gemma":[0.98302794,0.00008545072,0.01662642,0.000006540632,0.00005846199,0.000030356205,0.000002471628,0.00006996497,0.00009237201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903417,0.000008739391,0.00025572148,0.00023578812,0.00015886617,0.0003067233],"domain_scores_gemma":[0.99953556,0.00009478102,0.000016230646,0.0001906341,0.000033558586,0.00012923192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102191545,0.0002328741,0.00023679921,0.00008711561,0.00005315975,0.00011086755,0.00005160054,0.00010241796,0.000025300023],"category_scores_gemma":[0.000026618774,0.0002384603,0.000038660703,0.00015244473,0.000015428843,0.00008903393,0.000037224218,0.00018752733,0.000010643977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014431992,0.00001883646,0.000037000344,0.00036164618,0.00004239983,0.0000074888867,0.0002462053,0.99741834,0.0011256812,0.00053900044,0.00006552068,0.000136413],"study_design_scores_gemma":[0.00019052089,0.000022601887,0.000094429764,0.00032163688,0.000017834225,0.000015222379,0.000027830085,0.9945992,0.0032906071,0.00022894774,0.0009275435,0.00026362183],"about_ca_topic_score_codex":0.0000019300323,"about_ca_topic_score_gemma":1.5808072e-7,"teacher_disagreement_score":0.6619688,"about_ca_system_score_codex":0.0000467366,"about_ca_system_score_gemma":0.000005966462,"threshold_uncertainty_score":0.9724129},"labels":[],"label_agreement":null},{"id":"W3211702474","doi":"10.22215/etd/2017-11794","title":"Exact and Approximate Solutions for Energy Cost Optimization in Smart Homes","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Microgrid; Mathematical optimization; Smart grid; Computer science; Optimization problem; Convex optimization; Distributed generation; Linear programming; Scheduling (production processes); Energy storage; Renewable energy; Regular polygon; Mathematics; Engineering; Electrical engineering","score_opus":0.014252611948005742,"score_gpt":0.2308516639942552,"score_spread":0.21659905204624946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211702474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002208603,0.001798693,0.69811904,0.00008070737,0.0041258577,0.0012215262,0.000059813527,0.0007278451,0.29165792],"genre_scores_gemma":[0.6580258,0.022013085,0.041533012,0.00015485905,0.0013433689,0.009121249,0.036845695,0.0010445564,0.2299184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920803,0.000007336385,0.00020146932,0.00021738863,0.00008436951,0.00028141149],"domain_scores_gemma":[0.9995948,0.000028777828,0.000052458512,0.0002516005,0.000031307874,0.000041045623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000104589584,0.00021192223,0.00022304204,0.00025025266,0.000116802425,0.000099633406,0.00012461611,0.00016862142,0.000048844024],"category_scores_gemma":[0.000023046898,0.00023043707,0.000042071562,0.000055130335,0.000011130739,0.00015578498,0.000017454946,0.00006780553,0.0000015040202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010433546,0.000012375859,0.000031349995,0.00026286062,0.000054152835,0.0000010215148,0.000053753898,0.98214585,0.000020219171,0.00524912,0.0048090853,0.0073498003],"study_design_scores_gemma":[0.00040002732,0.000011222545,0.0012493262,0.000089953595,0.00003996097,4.91985e-7,0.00014127916,0.97308546,0.0002517615,0.00016514256,0.024255445,0.00030993365],"about_ca_topic_score_codex":0.00016701593,"about_ca_topic_score_gemma":0.0033303988,"teacher_disagreement_score":0.656586,"about_ca_system_score_codex":0.0000831871,"about_ca_system_score_gemma":0.00001389021,"threshold_uncertainty_score":0.9396951},"labels":[],"label_agreement":null},{"id":"W3212440815","doi":"10.32920/ryerson.14649462.v1","title":"Residential energy management systems with renewables and battery energy storage","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"Mitacs","keywords":"Renewable energy; Energy management; Computer science; Demand response; Variety (cybernetics); Environmental economics; Controller (irrigation); Model predictive control; Energy storage; Transactive memory; Energy consumption; Scale (ratio); Control (management); Risk analysis (engineering); Electricity; Energy (signal processing); Engineering; Business; Economics; Knowledge management","score_opus":0.005733752006449119,"score_gpt":0.16494873826689338,"score_spread":0.15921498626044425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212440815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021051217,0.0100248745,0.8592963,0.00015227363,0.00699008,0.0003177116,0.000019224432,0.00172238,0.10042589],"genre_scores_gemma":[0.9657843,0.006347231,0.0046463776,0.0001685527,0.00090490415,0.00056657696,0.00034682176,0.00026831374,0.020966915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976451,0.000080399455,0.00045435526,0.0008257634,0.0005117835,0.0004826382],"domain_scores_gemma":[0.9985849,0.00003096172,0.00008284549,0.0010899723,0.000054001437,0.00015727755],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014074097,0.00061323773,0.0005796242,0.00039527458,0.0000725294,0.00060374604,0.00037820011,0.000251166,0.000114198665],"category_scores_gemma":[0.0000017628488,0.0005896905,0.00008462028,0.00018509892,0.00004749041,0.0001383051,0.001319205,0.0001695205,0.0000020535476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000102642125,0.000019507994,0.000064593376,0.0010963187,0.0010918234,0.0004756005,0.000029229666,0.9471518,0.000039748225,0.0061311983,0.043233156,0.00065677817],"study_design_scores_gemma":[0.0018966907,0.00010458182,0.001826388,0.0031761937,0.0011225725,0.00012147853,0.001689194,0.5464088,0.0034703247,0.0003758992,0.4358045,0.0040034037],"about_ca_topic_score_codex":0.0034235972,"about_ca_topic_score_gemma":0.002822945,"teacher_disagreement_score":0.9447331,"about_ca_system_score_codex":0.00022351189,"about_ca_system_score_gemma":0.000025433861,"threshold_uncertainty_score":0.9996554},"labels":[],"label_agreement":null},{"id":"W3212441087","doi":"10.3390/en14227481","title":"Cost-Optimized Microgrid Coalitions Using Bayesian Reinforcement Learning","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Microgrid; Reinforcement learning; Renewable energy; Scheduling (production processes); Computer science; Mathematical optimization; Engineering; Artificial intelligence; Control (management)","score_opus":0.022077355232414483,"score_gpt":0.2382437622502773,"score_spread":0.21616640701786283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212441087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3014846,0.003715313,0.61458325,0.0003830567,0.0041231336,0.00036760757,0.000009392059,0.0029068228,0.07242682],"genre_scores_gemma":[0.9604626,0.00081330043,0.034909643,0.00015666733,0.00037012764,0.000077454955,0.00015537023,0.00008616822,0.0029686394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906296,0.000038927028,0.00023333952,0.00017935269,0.00016392024,0.0003214856],"domain_scores_gemma":[0.9995608,0.000039065664,0.000026801357,0.00025928495,0.000046552454,0.00006750457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008759115,0.00017021249,0.00017748967,0.000095495685,0.00014438062,0.00009114914,0.00010007316,0.00005055507,0.0004651143],"category_scores_gemma":[0.000026218146,0.00019733753,0.00008318033,0.00023475202,0.000027636761,0.00013664602,0.00009936958,0.00013685913,0.000028864366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025645452,0.0000073117094,0.00005054556,0.000025594882,0.00009280704,0.000034863955,0.0001620281,0.9904914,0.005420723,0.0010473718,0.0018808075,0.0007840079],"study_design_scores_gemma":[0.00053568295,0.000009173871,0.000074935415,0.000051859053,0.000051006442,0.000014496935,0.00087377796,0.70871645,0.055418078,0.000037709076,0.23389532,0.00032150358],"about_ca_topic_score_codex":0.00003782493,"about_ca_topic_score_gemma":0.000015743317,"teacher_disagreement_score":0.658978,"about_ca_system_score_codex":0.00014366454,"about_ca_system_score_gemma":0.000024772175,"threshold_uncertainty_score":0.8047191},"labels":[],"label_agreement":null},{"id":"W3212933713","doi":"10.32920/ryerson.14663079.v1","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Chubu Electric Power Company; University of Waterloo; Tennessee Valley Authority","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Environmental economics; Electricity; Grid; Electric power system; Distributed generation; Engineering; Environmental science; Power (physics); Electrical engineering; Economics","score_opus":0.02209325686729482,"score_gpt":0.23459497470373933,"score_spread":0.2125017178364445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212933713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013044949,0.0027131857,0.9584299,0.000038028247,0.012599344,0.00039713018,0.00003593484,0.0018262187,0.0109153325],"genre_scores_gemma":[0.955747,0.00020386491,0.036459196,0.00013563292,0.0016703457,0.0013801802,0.001160489,0.00031894172,0.0029243159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977936,0.000059241105,0.0005922857,0.00067979365,0.00030887243,0.000566193],"domain_scores_gemma":[0.99837524,0.00023786216,0.000102711834,0.0010278374,0.000108174856,0.00014819617],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023233806,0.0006239643,0.00074409787,0.00027428815,0.00006746832,0.00043363706,0.00055882643,0.0007370992,0.00012968924],"category_scores_gemma":[0.000091999354,0.00064502686,0.00025487258,0.0002469152,0.000020093912,0.00008639372,0.00050874485,0.00071649987,0.000010375332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000072903676,0.000017669756,0.000024345029,0.0007448858,0.00060885824,0.000052657244,0.00015575229,0.97259885,0.00008493114,0.014328071,0.010863123,0.00051356934],"study_design_scores_gemma":[0.00018664951,0.00001583577,0.000029577075,0.0011016997,0.000098139935,0.0000035411026,0.00064208556,0.9067647,0.00084003335,0.0006321145,0.088939846,0.0007457927],"about_ca_topic_score_codex":0.00047078278,"about_ca_topic_score_gemma":0.000045117893,"teacher_disagreement_score":0.9427021,"about_ca_system_score_codex":0.0004365252,"about_ca_system_score_gemma":0.00005956253,"threshold_uncertainty_score":0.9996001},"labels":[],"label_agreement":null},{"id":"W3213490051","doi":"10.1109/tai.2021.3125918","title":"Multiadvisor Reinforcement Learning for Multiagent Multiobjective Smart Home Energy Control","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Computer science; Curse of dimensionality; Scalability; Key (lock); Smart grid; Control (management); Demand response; Artificial intelligence; Machine learning; Engineering; Electricity","score_opus":0.024276005802833612,"score_gpt":0.24571070988491348,"score_spread":0.22143470408207985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213490051","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003387955,0.00007192434,0.9922348,0.00010279357,0.00284859,0.00035878792,0.000016370544,0.00048709838,0.0004916685],"genre_scores_gemma":[0.9957107,0.00017629808,0.002172326,0.00018363434,0.00015571581,0.0004097641,0.000015441547,0.00007633548,0.001099821],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998156,0.00006529861,0.0005521049,0.00044930616,0.00027772563,0.0004995391],"domain_scores_gemma":[0.9989573,0.0003018468,0.000053717158,0.00034712843,0.0001978773,0.00014217162],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001624381,0.00032152786,0.00029091607,0.00021301501,0.0003067089,0.00007696804,0.00017096127,0.000119208686,0.0002725487],"category_scores_gemma":[0.000025894768,0.00036991425,0.00025445156,0.00035591045,0.00007302638,0.00015908008,0.000002550668,0.00027843795,0.00015924383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009073809,0.00013963912,0.0000017836601,0.000029735087,0.00019955855,0.000011545322,0.0003712841,0.9142483,0.009321282,0.0009386286,0.000059494487,0.07458802],"study_design_scores_gemma":[0.0001539843,0.000095587675,0.000010251198,0.000023867127,0.000050089122,0.0000021926912,0.00047698227,0.6161687,0.37917626,0.00015055039,0.0034281455,0.0002633809],"about_ca_topic_score_codex":0.000084366,"about_ca_topic_score_gemma":0.00054455496,"teacher_disagreement_score":0.9923227,"about_ca_system_score_codex":0.00026682366,"about_ca_system_score_gemma":0.00003509913,"threshold_uncertainty_score":0.9998753},"labels":[],"label_agreement":null},{"id":"W3213721292","doi":"10.4271/14-11-02-0012","title":"A Decentralized Multi-agent Energy Management Strategy Based on a Look-Ahead Reinforcement Learning Approach","year":2021,"lang":"en","type":"article","venue":"SAE International Journal of Electrified Vehicles","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; Université du Québec à Trois-Rivières","funders":"","keywords":"Reinforcement learning; Reinforcement; Computer science; Process management; Artificial intelligence; Business; Engineering","score_opus":0.016935515687224508,"score_gpt":0.23861624496839523,"score_spread":0.22168072928117072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213721292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11741946,0.002258092,0.8409009,0.0007170518,0.00289375,0.0002911021,0.000005481697,0.00031958843,0.035194606],"genre_scores_gemma":[0.99232703,0.0011498268,0.004995095,0.00036283178,0.00024237669,0.000018234545,0.000045525958,0.000046720023,0.0008123733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977515,0.00009586446,0.0006565267,0.00022322728,0.00090500276,0.00036788607],"domain_scores_gemma":[0.99911726,0.000060894723,0.0001935197,0.00018915298,0.00030658164,0.00013259004],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000311666,0.0002536987,0.00026863843,0.00044130743,0.000058589816,0.00014307944,0.00045324743,0.000074453266,0.00012445507],"category_scores_gemma":[0.00003537711,0.00025218847,0.00021955582,0.0002610911,0.000020836527,0.000145322,0.000047326394,0.00034516407,0.000011273597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015626788,0.00021725979,0.00015369964,0.000029484534,0.00080646406,0.00041137348,0.00003828634,0.96679264,0.0067354366,0.005030476,0.0013780377,0.01825056],"study_design_scores_gemma":[0.0046646153,0.00026695518,0.0026278973,0.00020521627,0.0001084798,0.00007678194,0.0001750026,0.9174782,0.032946438,0.00017511004,0.040890742,0.00038454004],"about_ca_topic_score_codex":0.000011744672,"about_ca_topic_score_gemma":0.00001133231,"teacher_disagreement_score":0.87490755,"about_ca_system_score_codex":0.0004681263,"about_ca_system_score_gemma":0.00007269527,"threshold_uncertainty_score":0.999993},"labels":[],"label_agreement":null},{"id":"W3214275449","doi":"10.3390/su132212693","title":"A Novel Machine Learning-Based Price Forecasting for Energy Management Systems","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"Taif University","keywords":"Mean absolute percentage error; Electricity price forecasting; Computer science; Energy management system; Support vector machine; Time series; Electric power system; Tariff; Electricity; Firefly algorithm; Energy management; Data mining; Mathematical optimization; Machine learning; Energy (signal processing); Electricity market; Power (physics); Artificial neural network; Particle swarm optimization; Engineering; Economics; Statistics; Mathematics","score_opus":0.011679199068315858,"score_gpt":0.2063641730594343,"score_spread":0.19468497399111845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3214275449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077549634,0.00057170494,0.9858586,0.00025458724,0.00074259844,0.00055114727,0.000016606753,0.00061473664,0.003635047],"genre_scores_gemma":[0.99219793,0.000010220665,0.004033283,0.000053893087,0.00014179572,0.0006449465,0.000117964424,0.00006867734,0.002731294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984592,0.000050606403,0.00032926493,0.00040657248,0.00021610966,0.00053825194],"domain_scores_gemma":[0.99880767,0.00015772034,0.00004620806,0.00047710026,0.00041864286,0.000092644754],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047208508,0.00023131917,0.00024380811,0.00010722323,0.00013822323,0.00008135517,0.00016838542,0.000067793844,0.000024791108],"category_scores_gemma":[0.00032103376,0.00025584138,0.0001232638,0.0003951323,0.000027894032,0.00008239462,0.000121882156,0.000119884244,0.0000012693471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018445859,0.0000823891,0.0008504663,0.0023773885,0.000101958634,0.000038227212,0.000035308993,0.97935724,0.000032431846,0.013876616,0.0004956868,0.0027338613],"study_design_scores_gemma":[0.0006441666,0.000030388168,0.00060827914,0.000023518693,0.000036355646,0.0000038028231,0.0002749732,0.7802381,0.00034194486,0.00036652025,0.21720344,0.00022850894],"about_ca_topic_score_codex":0.00014501468,"about_ca_topic_score_gemma":0.000066813,"teacher_disagreement_score":0.98444295,"about_ca_system_score_codex":0.0011635988,"about_ca_system_score_gemma":0.00007419906,"threshold_uncertainty_score":0.9999894},"labels":[],"label_agreement":null},{"id":"W3215464418","doi":"10.1109/5gwf52925.2021.00042","title":"Deep Reinforcement Learning Based Coalition Formation for Energy Trading in Smart Grid","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Microgrid; Reinforcement learning; Computer science; Smart grid; Renewable energy; Reliability (semiconductor); Grid; Game theory; Dynamic pricing; Distributed computing; Scheme (mathematics); Minification; Mathematical optimization; Artificial intelligence; Control (management); Microeconomics; Engineering; Economics","score_opus":0.011711312304694632,"score_gpt":0.19638056921476724,"score_spread":0.1846692569100726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215464418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029229366,0.000043277643,0.9786706,0.00010742078,0.00043871487,0.00008738474,3.118709e-7,0.00022131676,0.017508024],"genre_scores_gemma":[0.9952263,0.000028512508,0.0034480358,0.00019606143,0.000107407745,0.00015604832,0.00033814818,0.000023975846,0.00047547455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992712,0.000020516954,0.00025133314,0.00011644635,0.00011894353,0.00022155241],"domain_scores_gemma":[0.9997525,0.000052059742,0.000020846284,0.00011143683,0.000028457123,0.000034675715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015055525,0.000104469706,0.00010676088,0.0001309887,0.000045210174,0.00003683205,0.000047270354,0.000041460597,0.00017258163],"category_scores_gemma":[0.000023928887,0.000120802906,0.000049150214,0.0001794431,0.0000038162993,0.00022765643,0.0000143698135,0.00005608138,0.000004532432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004872952,0.000007233635,0.00008385309,0.000080289596,0.000011292855,0.0000031208767,0.0000531403,0.9908864,0.00076511037,0.005153822,0.0015544671,0.0013964329],"study_design_scores_gemma":[0.0005654391,0.00001966726,0.00017999782,0.00002818212,0.000007611066,0.0000010921473,0.00015956536,0.9214385,0.02880889,0.00007147865,0.048586246,0.00013331692],"about_ca_topic_score_codex":0.000025815838,"about_ca_topic_score_gemma":0.00027555536,"teacher_disagreement_score":0.9923034,"about_ca_system_score_codex":0.00021128441,"about_ca_system_score_gemma":0.000008782368,"threshold_uncertainty_score":0.49261996},"labels":[],"label_agreement":null},{"id":"W3216471581","doi":"10.1016/j.enbuild.2021.111731","title":"A critical review of control schemes for demand-side energy management of building clusters","year":2021,"lang":"en","type":"review","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Peak demand; Energy consumption; HVAC; Demand response; Smart grid; Energy management; Load shifting; Environmental economics; Energy storage; Energy engineering; Zero-energy building; Energy management system; Control (management); Efficient energy use; Consumption (sociology); Building automation; Grid; Energy accounting; Microgrid; Engineering; Electricity; Energy (signal processing); Computer science; Air conditioning; Electrical engineering; Mechanical engineering","score_opus":0.017450274200787142,"score_gpt":0.27864349755950385,"score_spread":0.2611932233587167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216471581","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[8.0244115e-7,0.7976499,0.20095456,0.000035447694,0.00040256503,0.00019322595,0.000027333532,0.00006345674,0.0006726794],"genre_scores_gemma":[0.00012052868,0.98874974,0.010035031,0.00017232151,0.00016460713,0.00041648006,0.00006216816,0.00010769629,0.00017143476],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975818,0.0000825257,0.0011292569,0.00049355795,0.00028548113,0.0004274119],"domain_scores_gemma":[0.99864936,0.00042704766,0.00023632428,0.0004536387,0.00011733454,0.00011630812],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044298236,0.00054990867,0.002397695,0.00025156478,0.00005284532,0.000026350872,0.00034887137,0.00023227964,0.000029428924],"category_scores_gemma":[0.000078172896,0.00051588635,0.00066556624,0.00037675648,0.0001030387,0.00010478754,0.00020756676,0.00011434692,1.857959e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039483452,0.000026759843,2.056475e-7,0.24795836,0.0013100983,0.000017739778,0.0000030484641,0.0007023954,0.0000043184837,0.2765532,0.0036514516,0.46976846],"study_design_scores_gemma":[0.00029311643,0.00003101865,1.0677816e-7,0.14512514,0.0020740759,0.000015611628,0.0000050194735,0.0006634368,0.00011816027,0.00014318044,0.851149,0.0003821062],"about_ca_topic_score_codex":0.000014942897,"about_ca_topic_score_gemma":0.0000018586559,"teacher_disagreement_score":0.8474976,"about_ca_system_score_codex":0.00008378825,"about_ca_system_score_gemma":0.000033107633,"threshold_uncertainty_score":0.9997293},"labels":[],"label_agreement":null},{"id":"W3216854841","doi":"10.1109/epec52095.2021.9621744","title":"Market-Clearing Mechanism for Demand Aggregation at the distribution level through Transactive Energy","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Science and Engineering Research Council; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Transactive memory; Mechanism (biology); Clearing; Market mechanism; Market clearing; Distribution (mathematics); Business; Environmental economics; Computer science; Industrial organization; Microeconomics; Knowledge management; Economics; Market economy; Physics","score_opus":0.018186476941460885,"score_gpt":0.20464357294714716,"score_spread":0.18645709600568627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216854841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047378307,0.00010482858,0.9806219,0.0003991592,0.00047690503,0.00009963856,0.000034034783,0.00015791113,0.013367789],"genre_scores_gemma":[0.9882643,0.00021685654,0.0023699082,0.00018180831,0.00012899922,0.0001304028,0.00015517381,0.000034725734,0.008517807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993451,0.000023628088,0.00013536778,0.00017186227,0.00012614865,0.00019788955],"domain_scores_gemma":[0.9996264,0.00008228644,0.000017013188,0.00019614951,0.000055023986,0.000023135424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009711307,0.00011903082,0.0000946996,0.0000109972125,0.00014594487,0.000036760448,0.00007595058,0.000053575288,0.0002659061],"category_scores_gemma":[0.00001804517,0.00009863849,0.00007361244,0.00011551945,0.000013032768,0.00014225405,0.000030763724,0.00004310339,0.0000062679087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049016304,0.00003754243,0.000016143546,0.00010662417,0.0004532129,0.000009664942,0.00035761314,0.47683108,0.008549268,0.4603169,0.036130548,0.017142406],"study_design_scores_gemma":[0.00052354817,0.000016034272,0.0004992135,0.000022159482,0.00006771673,0.000007325902,0.00022629426,0.41910177,0.5070557,0.010050158,0.062198717,0.0002313675],"about_ca_topic_score_codex":0.000042020234,"about_ca_topic_score_gemma":0.00037396105,"teacher_disagreement_score":0.98352647,"about_ca_system_score_codex":0.00019929085,"about_ca_system_score_gemma":0.0000073249494,"threshold_uncertainty_score":0.40223607},"labels":[],"label_agreement":null},{"id":"W3217020979","doi":"10.1109/ecce47101.2021.9595608","title":"A Model-Based Short-term Load Forecast Methodology for Aggregated Power Consumption of Thermostatically Controlled Appliances in DSM","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Siemens Canada; Emera","keywords":"Reliability (semiconductor); Computer science; Term (time); Electric power system; Renewable energy; Reliability engineering; Air conditioning; Grid; Operator (biology); Power (physics); Wind power; Simulation; Control theory (sociology); Automotive engineering; Real-time computing; Control (management); Engineering; Electrical engineering","score_opus":0.07481255443132385,"score_gpt":0.30038315506747876,"score_spread":0.22557060063615492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217020979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26396316,0.00023320426,0.73174995,0.00007695515,0.00016459837,0.00047403734,0.000009267468,0.000095561656,0.0032332567],"genre_scores_gemma":[0.9207191,0.000033570468,0.07861236,0.00010038199,0.000011524863,0.00031979167,0.00002274647,0.000028128048,0.0001524133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893373,0.00006827656,0.00041297099,0.00020468858,0.00013259749,0.00024775337],"domain_scores_gemma":[0.9991321,0.00046213748,0.000034943205,0.00021626179,0.000114062605,0.00004052317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042461584,0.00015548439,0.000457697,0.00008613365,0.000013425739,0.0000119326705,0.000098794815,0.000086262145,0.00016046457],"category_scores_gemma":[0.00011434802,0.00014167688,0.00010173615,0.0001291727,0.000043954682,0.000046675483,0.0000220407,0.000066488945,0.0000037390282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004183995,0.00007472754,0.00097433967,0.00018972142,0.00017903517,0.00001238173,0.000102929545,0.95174015,0.03669935,0.005733048,0.00023568296,0.0036402398],"study_design_scores_gemma":[0.004086795,0.000039404436,0.00078461895,0.000043294876,0.00004303003,9.614452e-7,0.000041280615,0.9670421,0.026933247,0.0007051178,0.00012330961,0.00015684192],"about_ca_topic_score_codex":0.000005758592,"about_ca_topic_score_gemma":0.0002684563,"teacher_disagreement_score":0.6567559,"about_ca_system_score_codex":0.00008063776,"about_ca_system_score_gemma":0.000051029772,"threshold_uncertainty_score":0.5777415},"labels":[],"label_agreement":null},{"id":"W3217471358","doi":"10.18280/ejee.230502","title":"Impact of the Integration of a STATCOM Controlled by LQG/H2 Regulator in an Energy System","year":2021,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Linear-quadratic-Gaussian control; Control theory (sociology); Multivariable calculus; Linear-quadratic regulator; Controller (irrigation); MATLAB; AC power; Control engineering; Computer science; Gaussian; Voltage; Engineering; Control (management); Chemistry","score_opus":0.005144749324976477,"score_gpt":0.1891856677706632,"score_spread":0.18404091844568674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217471358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86903834,0.0011351621,0.12884128,0.000014296299,0.00033042204,0.00005846821,0.0000029307569,0.000035770365,0.0005433069],"genre_scores_gemma":[0.99929196,0.000039764294,0.00050453306,0.0000036894717,0.000092375994,0.0000010437647,0.0000016597215,0.000042175492,0.000022806096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985265,0.00019339674,0.0007550367,0.000083459796,0.00024908877,0.00019253086],"domain_scores_gemma":[0.9993318,0.00007902775,0.00017707622,0.00020708564,0.0001251094,0.00007991629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004520521,0.00014902788,0.0004263694,0.00019674916,0.000009907545,0.00001758757,0.00023840474,0.000024406361,0.000006403172],"category_scores_gemma":[0.00014501727,0.000106936975,0.00022142555,0.00058295764,0.000008820975,0.00011656828,0.000026530455,0.00022831155,2.8704662e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052989202,0.000043223146,0.00020542846,0.000028155813,0.00014516355,0.000044836936,0.000057507328,0.8378802,0.158742,0.00062156835,0.0002762089,0.0019027453],"study_design_scores_gemma":[0.0028054896,0.00036702128,0.018704804,0.00030954726,0.0000612099,0.000064563144,0.000038623675,0.9433925,0.033757757,0.0000037722548,0.00031842373,0.00017626696],"about_ca_topic_score_codex":0.0000073561596,"about_ca_topic_score_gemma":0.000002226662,"teacher_disagreement_score":0.13025358,"about_ca_system_score_codex":0.00024379954,"about_ca_system_score_gemma":0.00003460583,"threshold_uncertainty_score":0.43607634},"labels":[],"label_agreement":null},{"id":"W3217719870","doi":"10.1109/ecce47101.2021.9595165","title":"Smart Microgrid Architecture For Home Energy Management System","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Microgrid; Energy management system; Smart grid; Energy management; Computer science; Architecture; Embedded system; Software architecture; Home automation; Field (mathematics); Energy consumption; Systems engineering; Software; Engineering; Energy (signal processing); Control (management); Operating system; Electrical engineering; Artificial intelligence","score_opus":0.004369336319565318,"score_gpt":0.16525211952458638,"score_spread":0.16088278320502106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217719870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033901257,0.0011935579,0.8812019,0.00028564897,0.002867966,0.00022984875,0.000015492453,0.0015626644,0.10925277],"genre_scores_gemma":[0.8020411,0.00059440604,0.15677018,0.0011958681,0.001458983,0.001228008,0.00035401518,0.0003496466,0.03600779],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904025,0.0000133118865,0.00020291156,0.0002617947,0.0001373547,0.00034436552],"domain_scores_gemma":[0.9994492,0.000025747571,0.0000132635205,0.00040797342,0.000030712803,0.00007310052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006862117,0.00018805444,0.0001798599,0.00010528999,0.000049255934,0.000055833683,0.00016259382,0.000050239898,0.00006808917],"category_scores_gemma":[0.0000015770663,0.00018670403,0.000113814705,0.00019796939,0.000009574169,0.000035474048,0.00010093073,0.00004836765,0.000032417447],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016932465,0.000057310524,0.000107033724,0.0021466578,0.0011331072,0.00026925988,0.00006158848,0.51533014,0.002474839,0.24030147,0.16429077,0.073810905],"study_design_scores_gemma":[0.00047551363,0.000012960401,0.0002821274,0.00004945317,0.00005687708,0.000022549213,0.00015675272,0.01957512,0.01261195,0.0001842738,0.96627957,0.00029286678],"about_ca_topic_score_codex":0.0000104595265,"about_ca_topic_score_gemma":0.00007528977,"teacher_disagreement_score":0.8019888,"about_ca_system_score_codex":0.00011811872,"about_ca_system_score_gemma":0.000004842214,"threshold_uncertainty_score":0.76135695},"labels":[],"label_agreement":null},{"id":"W4200233353","doi":"10.3390/en15010107","title":"Smart Cities and Urban Management—A Section of Energies (ISSN 1996-1073)","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Section (typography); Smart city; Energy management; Urban management; Efficient energy use; Regional science; Environmental planning; Energy (signal processing); Urban planning; Architectural engineering; Transport engineering; Geography; Business; Computer science; Civil engineering; Engineering; Computer security; Internet of Things; Advertising; Physics","score_opus":0.004992383615320679,"score_gpt":0.16818948160234068,"score_spread":0.16319709798702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200233353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9265319,0.0036274719,0.0005035976,0.00006907861,0.0017185371,0.000055381282,0.0000064217543,0.00047048758,0.0670171],"genre_scores_gemma":[0.98840094,0.0022764604,0.0017543884,0.000053752,0.00026573928,0.0000393288,0.000029599587,0.00004643911,0.0071333647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990785,0.000027097893,0.00023827632,0.0002221354,0.00019754123,0.0002364179],"domain_scores_gemma":[0.9995219,0.000037766415,0.000031867585,0.00031841837,0.00003610431,0.00005391089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008282639,0.00019343194,0.0002182643,0.00017947468,0.00006212635,0.00005442812,0.000108310756,0.000060800645,0.000074848555],"category_scores_gemma":[0.000013231168,0.00021255814,0.00005959218,0.00026432035,0.00007076228,0.00018754377,0.00016311221,0.00007269085,0.0000045112365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011136617,0.00003200575,0.0072814696,0.0006325343,0.00052986393,0.00006748432,0.0007144228,0.8900841,0.0058688843,0.05014224,0.040242914,0.0043929457],"study_design_scores_gemma":[0.0009952576,0.0000622702,0.05537364,0.00020427976,0.0002014373,0.000020171818,0.005278756,0.010510276,0.24155396,0.0011597449,0.68376607,0.0008741688],"about_ca_topic_score_codex":0.000059898877,"about_ca_topic_score_gemma":0.00008517519,"teacher_disagreement_score":0.8795738,"about_ca_system_score_codex":0.000040920648,"about_ca_system_score_gemma":0.000008068959,"threshold_uncertainty_score":0.86678696},"labels":[],"label_agreement":null},{"id":"W4200292712","doi":"10.3390/en14248501","title":"Optimal Energy Management of a Campus Microgrid Considering Financial and Economic Analysis with Demand Response Strategies","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Microgrid; Demand response; Environmental economics; Energy management; Finance; Business; Demand management; Financial management; Energy (signal processing); Economics; Engineering; Macroeconomics; Electricity; Control (management); Electrical engineering; Management; Physics","score_opus":0.0037648444852269925,"score_gpt":0.18155883171790094,"score_spread":0.17779398723267395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200292712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9882127,0.0023729787,0.007882822,0.000027880107,0.0001375764,0.00002837877,0.000008359705,0.00010782471,0.001221454],"genre_scores_gemma":[0.9882071,0.0011069162,0.010368075,0.0000136785175,0.000038408794,0.000026518743,0.000011847128,0.000024403387,0.00020304261],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99916154,0.000039796818,0.0002309014,0.0002498633,0.00009555374,0.00022232882],"domain_scores_gemma":[0.99955046,0.00005938193,0.000042988122,0.00027889962,0.00002224709,0.00004601082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113542425,0.00018807894,0.00030558155,0.00021032765,0.000047197558,0.000077448865,0.00008525262,0.0000437596,0.00003760722],"category_scores_gemma":[0.0000031873858,0.00019071909,0.00006714527,0.00026427515,0.00008074858,0.00014210935,0.00011161448,0.00004544772,0.0000010664982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009216742,0.000009258207,0.00052552496,0.00007170693,0.0012829063,0.000193505,0.0001492493,0.98881614,0.0012090816,0.0068893493,0.00019846445,0.00056264433],"study_design_scores_gemma":[0.0052817212,0.00040892122,0.1777491,0.0004582457,0.005200269,0.00017982138,0.014662471,0.29634148,0.38253492,0.00065033516,0.11353855,0.0029941832],"about_ca_topic_score_codex":0.00009094095,"about_ca_topic_score_gemma":0.0005206391,"teacher_disagreement_score":0.69247466,"about_ca_system_score_codex":0.000054544886,"about_ca_system_score_gemma":0.000042997573,"threshold_uncertainty_score":0.7777299},"labels":[],"label_agreement":null},{"id":"W4200626580","doi":"10.1088/1742-6596/2069/1/012107","title":"Quantile regression using gradient boosted decision trees for daily residential energy load disaggregation","year":2021,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Quantile regression; Smart meter; Decision tree; Quantile; Linear regression; Computer science; Statistics; Metering mode; Electricity; Data mining; Machine learning; Engineering; Mathematics","score_opus":0.02599955855126318,"score_gpt":0.25449042146398554,"score_spread":0.22849086291272236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200626580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35804942,0.00062368595,0.6390513,0.000087429406,0.0018860309,0.00005046357,0.000008008604,0.000038008668,0.00020564873],"genre_scores_gemma":[0.98987645,0.00056236243,0.008748,0.000014107032,0.0006040133,0.000004117862,0.000014718709,0.000030771243,0.00014546429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99878347,0.000034557866,0.00043994808,0.00013656243,0.00041056838,0.00019486606],"domain_scores_gemma":[0.998853,0.00007343469,0.00022978065,0.00020208221,0.00057137595,0.000070270915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001352421,0.0001718283,0.00028671994,0.000058043886,0.00010114918,0.00014299367,0.00015767569,0.000055253997,0.00002281043],"category_scores_gemma":[0.00007772044,0.00015391227,0.000147933,0.00019508821,0.000037113798,0.0007450851,0.000058034733,0.00009920211,9.818046e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050187996,0.00014471814,0.000320727,0.00016552968,0.00036643448,0.000108055,0.0010446508,0.4470112,0.26875433,0.040289916,0.0067400965,0.23455246],"study_design_scores_gemma":[0.0012025357,0.00020158617,0.0014403244,0.00096941175,0.00015467941,0.000060183964,0.00085873186,0.071634434,0.8878448,0.02221986,0.013045857,0.00036757693],"about_ca_topic_score_codex":0.000012749387,"about_ca_topic_score_gemma":0.0001652576,"teacher_disagreement_score":0.631827,"about_ca_system_score_codex":0.0001486974,"about_ca_system_score_gemma":0.00014410545,"threshold_uncertainty_score":0.6276361},"labels":[],"label_agreement":null},{"id":"W4205302458","doi":"10.1109/access.2021.3139985","title":"Auction-Based Scheduling of Excess Energy Consumption to Enhance Grid Upward Flexibility","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Cloud computing; Energy consumption; Distributed computing; Renewable energy; Grid; Flexibility (engineering); Load balancing (electrical power); Scheduling (production processes); Workload; Efficient energy use; Operating system; Operations management; Engineering; Electrical engineering","score_opus":0.030273850146297233,"score_gpt":0.3096852245897729,"score_spread":0.27941137444347564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205302458","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59035856,0.0001828862,0.4059525,0.00007326906,0.002640035,0.00005670865,0.000007815178,0.0002006791,0.00052751857],"genre_scores_gemma":[0.99701005,0.000053487318,0.0022422795,0.00017039933,0.0003407516,0.000060931852,0.00001968202,0.000029791543,0.0000726028],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99887395,0.000039297753,0.0003155192,0.0003086743,0.00023300188,0.0002295442],"domain_scores_gemma":[0.99916816,0.00006899356,0.000046118508,0.0004957174,0.00013485506,0.00008614896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014936563,0.00015411006,0.00021191956,0.00011806962,0.000043760538,0.000061870014,0.00029170795,0.00006380866,0.00021568898],"category_scores_gemma":[0.000044178156,0.00018134004,0.00006564229,0.00041022096,0.000028704379,0.00025183812,0.00006469533,0.00008302994,0.000024153529],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012401674,0.00003499833,0.0018141039,0.00019470595,0.000041123927,0.000006832795,0.000019780291,0.978819,0.013740228,0.00008758812,0.0007933541,0.004435862],"study_design_scores_gemma":[0.00016165114,0.000010683121,0.0065005915,0.00008121016,0.000021548507,9.2947545e-7,0.000008109285,0.08973736,0.89940685,0.000108736545,0.0037441663,0.00021816084],"about_ca_topic_score_codex":0.000093638824,"about_ca_topic_score_gemma":0.00019450324,"teacher_disagreement_score":0.88908166,"about_ca_system_score_codex":0.00011802178,"about_ca_system_score_gemma":0.000034983837,"threshold_uncertainty_score":0.73948324},"labels":[],"label_agreement":null},{"id":"W4205688508","doi":"10.1609/aimag.v42i2.15096","title":"Optimizing smart grid operations from the demand side","year":2021,"lang":"en","type":"article","venue":"AI Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Natural Science Foundation of China; Nanyang Technological University; National Research Foundation Singapore; National Science Council; National Research Foundation","keywords":"Electricity; Smart grid; Demand response; Process (computing); Computer science; Grid; Power demand; Electric power system; Power (physics); Demand side; Power consumption; Shutdown; Operations research; Dynamic demand; Power grid; Consumption (sociology); Business; Environmental economics; Engineering; Economics; Electrical engineering","score_opus":0.009474168610807864,"score_gpt":0.20554817983278792,"score_spread":0.19607401122198007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205688508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.324389,0.011313454,0.40165874,0.038843103,0.012994246,0.000704119,0.00016125954,0.0024122784,0.2075238],"genre_scores_gemma":[0.96480954,0.0006814574,0.02111721,0.0059092855,0.002172262,0.000098842065,0.00041782166,0.000110702036,0.0046828906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993494,0.000027229618,0.00015769829,0.00016019975,0.000120266945,0.0001852042],"domain_scores_gemma":[0.9994382,0.00006973503,0.0000066261746,0.00040350136,0.000038081213,0.000043801512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000077010474,0.000119716475,0.00010950075,0.00002084251,0.000096907905,0.00010332298,0.0001438842,0.000032264987,0.00041918413],"category_scores_gemma":[0.000036277725,0.00009962015,0.000045122106,0.00017739032,0.000017251556,0.00012850118,0.00010065503,0.00013064839,0.00046690562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.3600914e-7,0.000009950086,0.00030433323,0.0000051556353,0.00008564808,0.000036984573,0.00012132188,0.89429533,0.0050119,0.0006938819,0.09883966,0.00059490633],"study_design_scores_gemma":[0.00043472412,0.000009204167,0.01922054,0.000034959,0.00007633979,0.000008802622,0.00007855704,0.296504,0.009509154,0.00016351778,0.67368436,0.00027584008],"about_ca_topic_score_codex":0.00004425471,"about_ca_topic_score_gemma":0.00087131024,"teacher_disagreement_score":0.6404205,"about_ca_system_score_codex":0.000034995104,"about_ca_system_score_gemma":0.000013399665,"threshold_uncertainty_score":0.6001283},"labels":[],"label_agreement":null},{"id":"W4206057491","doi":"10.3390/en15030752","title":"Feasibility of Solar Grid-Based Industrial Virtual Power Plant for Optimal Energy Scheduling: A Case of Indian Power Sector","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Virtual power plant; Renewable energy; Distributed generation; Grid; Peaking power plant; Scheduling (production processes); Engineering; Reliability engineering; Automotive engineering; Computer science; Electrical engineering; Operations management","score_opus":0.026202412106070876,"score_gpt":0.22359333355805172,"score_spread":0.19739092145198084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206057491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9943009,0.0001186885,0.0021355879,0.000027755175,0.0023221949,0.00019247453,0.00048050052,0.00014987768,0.000272044],"genre_scores_gemma":[0.99801517,0.0000027588233,0.0013930437,0.000034050165,0.00016593272,0.00015774202,0.00012128752,0.000057723122,0.000052304847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99854386,0.00007723639,0.00046738246,0.00028182735,0.0002951514,0.00033455945],"domain_scores_gemma":[0.99913484,0.00017853311,0.000118396485,0.00043794265,0.000049038514,0.00008123018],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036224702,0.00023815407,0.00037037453,0.0002886236,0.000107775464,0.000015722271,0.00026914725,0.00010264199,0.00030568265],"category_scores_gemma":[0.0000797904,0.00025996094,0.00018278959,0.0002920915,0.000072333394,0.000089526824,0.00013760664,0.0001840323,4.6501728e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026048013,0.00012336306,0.00038285,0.00004154946,0.00014885621,0.00013061288,0.00039014415,0.99158835,0.0014230128,0.0029380445,0.0024254997,0.00014721171],"study_design_scores_gemma":[0.01616052,0.004369502,0.0009350945,0.00014957417,0.00031087454,0.0002784233,0.011314565,0.36871457,0.43570575,0.00021532133,0.1592653,0.002580528],"about_ca_topic_score_codex":0.0002893067,"about_ca_topic_score_gemma":0.00008577486,"teacher_disagreement_score":0.62287384,"about_ca_system_score_codex":0.00017055396,"about_ca_system_score_gemma":0.00010287438,"threshold_uncertainty_score":0.9999853},"labels":[],"label_agreement":null},{"id":"W4206080373","doi":"10.1109/tesc50295.2020.9656872","title":"Distributed Energy Resources Parameter Monitoring in Microgrids Using Blockchain and Edge Computing","year":2020,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Blockchain; Computer science; Edge computing; Distributed computing; Enhanced Data Rates for GSM Evolution; Distributed generation; Computer security; Telecommunications; Renewable energy; Electrical engineering; Engineering","score_opus":0.017944251741020503,"score_gpt":0.20752456311187098,"score_spread":0.18958031137085046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206080373","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95399964,0.00039749115,0.044699453,0.00009857794,0.00020572684,0.000039734758,0.000002143244,0.0002823728,0.0002748732],"genre_scores_gemma":[0.9943961,0.00001726104,0.0051746615,0.00006948777,0.0003009752,0.0000024127414,0.0000033632098,0.000028827419,0.000006895032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920344,0.00002185503,0.00021411064,0.00020200053,0.000089305024,0.0002692907],"domain_scores_gemma":[0.9997213,0.00006028506,0.000016690052,0.00010208634,0.000008308846,0.000091350565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070622016,0.00015151568,0.00016674885,0.000073912575,0.00003702195,0.00005662139,0.00009816093,0.0000488474,0.0000061219494],"category_scores_gemma":[0.000018787745,0.00016078386,0.00002487748,0.00028217654,0.000019632364,0.000035912035,0.00013801825,0.00009822122,0.0000013679833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004407156,0.000007881587,0.02345106,0.000045769484,0.00003785521,0.000024950257,0.00039699662,0.9648502,0.006146881,0.00008144006,0.00019323842,0.0047593196],"study_design_scores_gemma":[0.00026514172,0.000011976449,0.0075556263,0.000036954436,0.000009610681,0.0000025932104,0.00024826676,0.9771791,0.010037821,0.000010549504,0.004434913,0.00020743381],"about_ca_topic_score_codex":0.00014954027,"about_ca_topic_score_gemma":0.000011640962,"teacher_disagreement_score":0.04039649,"about_ca_system_score_codex":0.000056976914,"about_ca_system_score_gemma":0.0000021186038,"threshold_uncertainty_score":0.65565753},"labels":[],"label_agreement":null},{"id":"W4206312118","doi":"10.1109/tpwrd.2022.3140251","title":"A New Selection Tool of Retail Electric Provider for Prosumers With Local Distributed Resources and Plug-in Electric Vehicles","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photovoltaic system; Environmental economics; Plan (archaeology); Plug-in; Computer science; Business; Engineering; Electrical engineering","score_opus":0.005388307593978449,"score_gpt":0.17179192676908267,"score_spread":0.1664036191751042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206312118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4706392,0.00016169099,0.5285022,0.000039155988,0.000095793,0.00038761916,0.000018012544,0.00012228506,0.00003401687],"genre_scores_gemma":[0.998881,0.000046782323,0.0005084596,0.000025083533,0.0000112042735,0.00028933358,0.0000055692635,0.000041803913,0.00019079295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895614,0.000035275447,0.00023724414,0.00025386582,0.00023284787,0.00028464047],"domain_scores_gemma":[0.9996753,0.00007140594,0.000039392686,0.00013262952,0.000033812936,0.000047496043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011761362,0.00017139356,0.00018565198,0.00041329415,0.0001246318,0.000019768124,0.00009258359,0.000047617963,0.000042818043],"category_scores_gemma":[0.0000019127338,0.00017979687,0.000055210538,0.0010300996,0.000016960255,0.00013363069,0.0000017763804,0.0002475044,8.8198226e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005529348,0.00009050278,0.00020514299,0.00006595395,0.00014482473,0.0000039866186,0.0001700749,0.9740307,0.00618992,0.000016973088,0.0008350903,0.01769391],"study_design_scores_gemma":[0.005018703,0.0033346373,0.0074225236,0.00008031698,0.00035569942,0.000064086686,0.00053627684,0.8184455,0.14593947,0.00007462112,0.0177143,0.0010138536],"about_ca_topic_score_codex":0.00015737396,"about_ca_topic_score_gemma":0.00014620178,"teacher_disagreement_score":0.52824175,"about_ca_system_score_codex":0.00031976344,"about_ca_system_score_gemma":0.000055925146,"threshold_uncertainty_score":0.73319036},"labels":[],"label_agreement":null},{"id":"W4206389244","doi":"10.1109/access.2021.3133292","title":"A Nonintrusive Load Monitoring Based on Multi-Target Regression Approach","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Walailak University","keywords":"Computer science; Random forest; Benchmarking; Machine learning; Artificial intelligence; Aggregate (composite); Process (computing); Data mining; Data set; Artificial neural network; Data modeling; Hidden Markov model; Benchmark (surveying); Autoencoder","score_opus":0.033711723929018125,"score_gpt":0.27831914187422646,"score_spread":0.24460741794520835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206389244","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41122887,0.00089976937,0.50005686,0.00019438693,0.013453776,0.0005177076,0.00001671401,0.0017090094,0.07192291],"genre_scores_gemma":[0.9863865,0.00003319731,0.012335816,0.00009512332,0.0005868351,0.00009106247,0.000013660181,0.000061523475,0.00039630826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988308,0.00003308947,0.00017345721,0.00031670308,0.00034414564,0.00030181988],"domain_scores_gemma":[0.9992721,0.000044456145,0.000030518204,0.0004917233,0.00007587153,0.0000853095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098980614,0.00021047746,0.00018329687,0.0000934738,0.00007269111,0.00013333546,0.00033772545,0.000081159495,0.00005763398],"category_scores_gemma":[0.000034318364,0.00020092113,0.000067398054,0.00033178763,0.00001394235,0.00021796957,0.00007639788,0.00019534888,0.000047781577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009324115,0.000076746255,0.0033807815,0.0000871337,0.00003517074,0.000089621295,0.000060156006,0.9903423,0.002038544,0.000011527828,0.0024192336,0.001449466],"study_design_scores_gemma":[0.00068851415,0.000010393009,0.0059958356,0.0001402206,0.000015913472,0.000002037366,0.000042965978,0.6993793,0.2881346,0.00001142925,0.0052925562,0.00028619485],"about_ca_topic_score_codex":0.000021770853,"about_ca_topic_score_gemma":0.0000038603794,"teacher_disagreement_score":0.57515764,"about_ca_system_score_codex":0.00022504786,"about_ca_system_score_gemma":0.000034568297,"threshold_uncertainty_score":0.8193326},"labels":[],"label_agreement":null},{"id":"W4206424937","doi":"10.1109/pesgm46819.2021.9638017","title":"Demand Response Cooperative and Demand Charge","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Schedule; Demand response; Mathematical optimization; Operations research; Computer science; Electricity; Electricity market; Scheduling (production processes); Probabilistic logic; Piecewise linear function; Linear programming; Engineering; Mathematics","score_opus":0.011313333327400244,"score_gpt":0.22187354857078187,"score_spread":0.21056021524338162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206424937","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.944588,0.007287332,0.03597321,0.000979728,0.0029728021,0.0001388513,0.0000385254,0.00044587086,0.007575693],"genre_scores_gemma":[0.91627544,0.005468654,0.026871523,0.0027352276,0.002011693,0.00019205938,0.00022689988,0.00036315015,0.045855355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967727,0.00044709715,0.0005812238,0.0008404216,0.0004818526,0.0008767088],"domain_scores_gemma":[0.9983968,0.00026887553,0.00009186325,0.0007021334,0.0002235748,0.00031674237],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010787471,0.0006014902,0.0005778491,0.000083029445,0.00041492123,0.00024257145,0.00025838756,0.00029886284,0.00045551377],"category_scores_gemma":[0.00017404018,0.00064387475,0.0003172134,0.00061580655,0.00013252653,0.00022227535,0.00024176754,0.00035939005,0.00008213291],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000898327,0.00009845134,0.00051050907,0.000094777475,0.0010301091,0.000076424345,0.004126403,0.5225735,0.3065405,0.001024261,0.1634095,0.00042576526],"study_design_scores_gemma":[0.0016773497,0.000057113284,0.00071020314,0.00019373179,0.0001687946,0.00006715683,0.00040886193,0.05242202,0.12701276,0.00011227399,0.8156307,0.001539058],"about_ca_topic_score_codex":0.000060640963,"about_ca_topic_score_gemma":0.00019732268,"teacher_disagreement_score":0.65222114,"about_ca_system_score_codex":0.00022330118,"about_ca_system_score_gemma":0.000088016335,"threshold_uncertainty_score":0.99960124},"labels":[],"label_agreement":null},{"id":"W4206503412","doi":"10.1109/jsyst.2021.3132786","title":"New Real-Time Demand Response Market Co-Optimized With Conventional Energy Market","year":2022,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Procurement; Electricity market; Energy market; Business; Inefficiency; Market demand schedule; Market power; Social Welfare; Supply and demand; Electricity; Demand curve; Industrial organization; Factor market; Economics; Environmental economics; Microeconomics; Engineering; Marketing; Monopoly; Electrical engineering","score_opus":0.005956468335663657,"score_gpt":0.19352468484022112,"score_spread":0.18756821650455746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206503412","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14411516,0.003023742,0.5088063,0.00085455284,0.023754291,0.0011386152,0.0002197356,0.0017414256,0.31634617],"genre_scores_gemma":[0.7756202,0.00040874688,0.004437036,0.00011863571,0.002870994,0.00022764504,0.0000328447,0.00030094458,0.21598291],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997111,0.00081753155,0.0005502667,0.00022937158,0.00084319984,0.00044860254],"domain_scores_gemma":[0.9989354,0.00020785014,0.00017854429,0.0003170085,0.000056019613,0.0003051965],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002089378,0.0002741882,0.00038088934,0.0003516903,0.00033776814,0.00016694936,0.00035563367,0.000055106313,0.0069958325],"category_scores_gemma":[0.000014210505,0.00026061997,0.000131668,0.00028009657,0.000024380022,0.00017326445,0.000048222508,0.0003222412,0.000030832314],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011580016,0.000012616834,0.00006964839,0.00001683357,0.00027112142,0.00026942592,0.000025116595,0.5294698,0.00079900783,0.00003257246,0.46782774,0.00004813598],"study_design_scores_gemma":[0.005194927,0.0003145719,0.0019092113,0.00013673173,0.000111548485,0.0043702023,0.00014846465,0.3113407,0.0002167917,0.000038322312,0.67557424,0.00064426236],"about_ca_topic_score_codex":0.00007430097,"about_ca_topic_score_gemma":0.0000032216667,"teacher_disagreement_score":0.6315051,"about_ca_system_score_codex":0.00052507204,"about_ca_system_score_gemma":0.00015749043,"threshold_uncertainty_score":0.9999846},"labels":[],"label_agreement":null},{"id":"W4210639342","doi":"10.1201/b11897-7","title":"Smart Grids","year":2012,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.01224850663436613,"score_gpt":0.16877256482007252,"score_spread":0.1565240581857064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210639342","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000035629917,0.0011195064,0.0020340704,0.000022769242,0.0022965306,0.00008034672,0.0000039496126,0.00086067925,0.9935786],"genre_scores_gemma":[0.0015431765,0.00057848013,0.00051862467,0.000098575176,0.0011137296,0.000010661113,0.00004113431,0.00015272119,0.9959429],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992992,0.000001248968,0.00016695177,0.00013520797,0.00016232824,0.00023504993],"domain_scores_gemma":[0.99948573,0.000011636056,0.000015108181,0.00039012692,0.000011600964,0.00008576918],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00005380912,0.00027336198,0.0001977873,0.00011248619,0.00001573154,0.00001615561,0.00014967719,0.00018932667,0.007559151],"category_scores_gemma":[9.970325e-7,0.0002709771,0.00009306907,0.000010592928,0.000016211918,0.00005528489,0.00007437753,0.00018593868,0.004525846],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.755789e-7,0.000002931309,0.000012680955,0.00008746803,0.0002487663,0.0000102273025,0.000011401378,0.0056418013,0.000008440883,0.6026792,0.37800202,0.013294276],"study_design_scores_gemma":[0.00005049405,0.0000047022386,0.000049397848,0.000022504275,0.000044598368,0.0000021905164,7.041122e-7,0.00050038466,0.000045729845,0.001084613,0.99787354,0.00032110856],"about_ca_topic_score_codex":0.0000049041496,"about_ca_topic_score_gemma":0.000016306622,"teacher_disagreement_score":0.61987156,"about_ca_system_score_codex":0.00008980637,"about_ca_system_score_gemma":0.0000034236682,"threshold_uncertainty_score":0.99997425},"labels":[],"label_agreement":null},{"id":"W4210640944","doi":"10.1109/tia.2022.3146105","title":"Energy Not-Served-Based Method for Assessing Smart Grid Functions in Residential Loads","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Demand response; Load management; Grid; Peak demand; Transformer; Reliability engineering; Automotive engineering; Energy management; Computer science; Air conditioning; Smart meter; Engineering; Energy (signal processing); Electrical engineering; Electricity; Voltage; Mathematics; Mechanical engineering","score_opus":0.02309344651480718,"score_gpt":0.26863219782059755,"score_spread":0.24553875130579036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210640944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022757314,0.000014745864,0.9928157,0.00078652817,0.0013662924,0.00053255225,0.00036399034,0.0004913171,0.0013531961],"genre_scores_gemma":[0.96715695,0.000003772535,0.011018282,0.0004407715,0.00031409497,0.019113628,0.00015959075,0.00010758652,0.0016853317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983646,0.0001023882,0.00043873207,0.00042704257,0.00029148272,0.00037574724],"domain_scores_gemma":[0.9989431,0.00026063196,0.000059288188,0.00058594585,0.0000455793,0.000105451116],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003319439,0.00023960682,0.00020832282,0.0005641871,0.000709558,0.000076469965,0.00031615407,0.00020604114,0.00059572636],"category_scores_gemma":[0.0000024242634,0.0003215026,0.00015741236,0.0011776609,0.000032097225,0.00018306752,0.000004804341,0.00088633836,0.000012417433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020184028,0.00020463028,0.000019913548,0.000023449857,0.00005705211,0.0000014789308,0.000019071866,0.98243695,0.0017238237,0.00044863916,0.0057375627,0.009307247],"study_design_scores_gemma":[0.0012804796,0.00006717574,0.00065512693,0.00001992335,0.00015771706,0.000008983419,0.00033289043,0.6321036,0.029336307,0.00018493776,0.3352819,0.00057091896],"about_ca_topic_score_codex":0.00035778552,"about_ca_topic_score_gemma":0.00040990664,"teacher_disagreement_score":0.98179734,"about_ca_system_score_codex":0.0005266182,"about_ca_system_score_gemma":0.00009991794,"threshold_uncertainty_score":0.9999237},"labels":[],"label_agreement":null},{"id":"W4210683135","doi":"10.1002/oca.2862","title":"Building‐to‐grid optimal control of integrated MicroCSP and building HVAC system for optimal demand response services","year":2022,"lang":"en","type":"article","venue":"Optimal Control Applications and Methods","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"HVAC; Demand response; Renewable energy; Grid; Electric power system; Base load power plant; Dynamic demand; Computer science; Automotive engineering; Solar power; Distributed generation; Air conditioning; Power (physics); Engineering; Electrical engineering; Electricity; Mechanical engineering","score_opus":0.006578140422008411,"score_gpt":0.2771290677832138,"score_spread":0.27055092736120534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210683135","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14735977,0.0017244753,0.8483419,0.00015420139,0.00015782606,0.0016047301,0.00040348413,0.00019913388,0.00005447746],"genre_scores_gemma":[0.48993945,0.000018587867,0.50670296,0.00006536591,0.00008220474,0.003095017,0.000015093208,0.000048892696,0.000032414966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99803996,0.00030581464,0.00055553066,0.0005073366,0.00016824875,0.00042310875],"domain_scores_gemma":[0.998363,0.0007772636,0.00013874575,0.00039206742,0.00013271421,0.00019617309],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024399657,0.00032438204,0.00060261023,0.00032363302,0.00038255658,0.00008891727,0.00033265734,0.00008316126,0.000012450346],"category_scores_gemma":[0.00003566957,0.0003382351,0.000106243795,0.0004063609,0.000058700174,0.00011239386,0.00017084274,0.00019910089,7.0056984e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00115318,0.00003192185,0.00004919528,0.0002586237,0.00025242157,0.0000013241649,0.000120045166,0.75297546,0.23308414,0.0044008973,0.000077927354,0.007594882],"study_design_scores_gemma":[0.0029679122,0.0002897439,0.00047174355,0.000038686907,0.0003119319,0.000031346302,0.00078171614,0.81992257,0.010573044,0.000024074061,0.1642069,0.00038034332],"about_ca_topic_score_codex":0.0000379115,"about_ca_topic_score_gemma":0.0000013971473,"teacher_disagreement_score":0.3425797,"about_ca_system_score_codex":0.00015338535,"about_ca_system_score_gemma":0.00003174897,"threshold_uncertainty_score":0.99990696},"labels":[],"label_agreement":null},{"id":"W4210771357","doi":"10.1109/pic53636.2021.9687026","title":"Double-Sided Auction Mechanism for Peer-to-Peer Energy Trading Markets","year":2021,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Double auction; Mechanism design; Grid; Peer-to-peer; Smart grid; Incentive; Microeconomics; Electricity; Matching (statistics); Distributed generation; Environmental economics; Risk analysis (engineering); Business; Distributed computing; Economics; Common value auction; Renewable energy","score_opus":0.017694138400601456,"score_gpt":0.22155224169368457,"score_spread":0.2038581032930831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210771357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01452706,0.000026108244,0.9058646,0.0026795627,0.0037469373,0.00016836134,0.0000048754914,0.0008200873,0.07216241],"genre_scores_gemma":[0.90218055,0.000017023098,0.022158561,0.00062824326,0.0006243945,0.00026642357,0.000081360595,0.0000986859,0.073944725],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988683,0.0000111602585,0.00020567409,0.00026991768,0.00031599155,0.00032896764],"domain_scores_gemma":[0.9993574,0.000047655984,0.000013271543,0.00028017635,0.00019274956,0.0001087302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001993816,0.00017332724,0.00015993549,0.00012797557,0.00006384595,0.000075703785,0.0001134146,0.00007402424,0.00043837144],"category_scores_gemma":[0.000049361457,0.00019110474,0.00009064651,0.00024321342,0.000003867182,0.00012543664,0.00004777059,0.000054248696,0.000025057605],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005683971,0.00004044251,0.000007656787,0.00008842562,0.00029766504,0.000030581486,0.00017315033,0.20258006,0.032800104,0.44770727,0.3093391,0.0068787024],"study_design_scores_gemma":[0.00097165006,0.000020948128,0.000089345,0.000020501593,0.000041229214,0.000010656171,0.00014445254,0.26707205,0.38122112,0.0026028566,0.34745535,0.000349821],"about_ca_topic_score_codex":0.000037137932,"about_ca_topic_score_gemma":0.00018166183,"teacher_disagreement_score":0.8876535,"about_ca_system_score_codex":0.0001426033,"about_ca_system_score_gemma":0.000011280128,"threshold_uncertainty_score":0.77930254},"labels":[],"label_agreement":null},{"id":"W4210784356","doi":"10.1109/globecom46510.2021.9685510","title":"A Multi-Agent Reinforcement Learning Approach for Blockchain-based Electricity Trading System","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Global Communications Conference (GLOBECOM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Blockchain; Reinforcement learning; Electricity; Smart contract; Stackelberg competition; Microgrid; Nash equilibrium; Distributed computing; Computer security; Microeconomics; Control (management); Artificial intelligence; Economics","score_opus":0.05022244698591615,"score_gpt":0.2621397734570107,"score_spread":0.21191732647109457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210784356","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019218845,0.0009614007,0.95114124,0.00022580128,0.0005026306,0.0007859991,0.00004482468,0.0006845514,0.02643473],"genre_scores_gemma":[0.9300619,0.00010556051,0.068504885,0.000073119474,0.00007030038,0.0006202842,0.00027569663,0.00003863476,0.0002496386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977985,0.00023105048,0.0006181581,0.0004324867,0.00031199897,0.00060783257],"domain_scores_gemma":[0.9973611,0.00014061507,0.00012812541,0.001840434,0.00035348942,0.00017622729],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042364837,0.00036959635,0.0004288711,0.00010712282,0.0004982606,0.00018447211,0.001156522,0.00014185991,0.000056558692],"category_scores_gemma":[0.00009014371,0.00044271862,0.00021899998,0.0008506123,0.000068689806,0.000044340377,0.00022327478,0.00036911186,0.000029547276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008296462,0.00013328675,0.00028948835,0.00022280434,0.00019942288,0.0000038606086,0.00008913324,0.98619986,0.0009680188,0.008683674,0.0010791137,0.0021230357],"study_design_scores_gemma":[0.000903137,0.000036913523,0.00018203449,0.00010041469,0.000108792054,0.000008561142,0.00071387505,0.9864172,0.0014791571,0.000014109975,0.009611669,0.00042415995],"about_ca_topic_score_codex":0.000119433855,"about_ca_topic_score_gemma":0.00016245639,"teacher_disagreement_score":0.910843,"about_ca_system_score_codex":0.0011856135,"about_ca_system_score_gemma":0.00021274782,"threshold_uncertainty_score":0.9998025},"labels":[],"label_agreement":null},{"id":"W4210948880","doi":"10.32920/ryerson.14655963.v1","title":"Optimization models for distribution planning and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Sizing; Smart grid; Grid; Electric power distribution; Renewable energy; Electric power system; Operations research; Reliability engineering; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Voltage","score_opus":0.021714361631857776,"score_gpt":0.22361995749775462,"score_spread":0.20190559586589685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210948880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003701265,0.00040460576,0.99306214,0.000045931814,0.0006242136,0.00026205982,0.00002409452,0.00026773417,0.0016079566],"genre_scores_gemma":[0.8997329,0.00025572933,0.09234938,0.000029605413,0.00021820143,0.00029663413,0.006928913,0.000043426433,0.00014522494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994926,0.0000069049765,0.00014102107,0.00019315428,0.00006572967,0.000100630685],"domain_scores_gemma":[0.9997656,0.000012920573,0.000015686575,0.00014114859,0.000039249153,0.000025412846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007178084,0.00012597366,0.00011834835,0.000031927997,0.00003724062,0.0001567477,0.000046035864,0.00011779197,0.000013608021],"category_scores_gemma":[0.0000074558116,0.00014160902,0.000027282998,0.000027515756,0.0000046486734,0.00013520445,0.00012168926,0.000081066166,2.476321e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013947293,0.0000029960984,0.000008855333,0.00015121528,0.00003671593,4.7304505e-7,0.000058437116,0.99665135,0.000013658948,0.0015100251,0.0012236054,0.00034124264],"study_design_scores_gemma":[0.00011324098,0.000004090392,0.000044979624,0.00005364137,0.000026177155,4.6982768e-7,0.000050347753,0.9986461,0.00038123404,0.00019450863,0.0003337047,0.00015153702],"about_ca_topic_score_codex":0.000009275095,"about_ca_topic_score_gemma":0.0000037154211,"teacher_disagreement_score":0.9007127,"about_ca_system_score_codex":0.000084636005,"about_ca_system_score_gemma":0.0000086585815,"threshold_uncertainty_score":0.5774648},"labels":[],"label_agreement":null},{"id":"W4211105564","doi":"10.1109/tpwrd.2022.3150256","title":"Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism With Transactive DERs","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Independent Electricity System Operator","funders":"Independent Electricity System Operator","keywords":"Distributed generation; Electric power system; Environmental economics; Demand response; Business; Electricity; Computer science; Economics; Engineering; Renewable energy; Power (physics)","score_opus":0.008738736263665507,"score_gpt":0.16641897528592103,"score_spread":0.15768023902225553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4211105564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38359624,0.000014796719,0.6139203,0.000015056595,0.0011518628,0.00022754593,0.00016516485,0.00063756044,0.0002715206],"genre_scores_gemma":[0.9993138,0.000005699565,0.0002153192,0.000034863227,0.000016081809,0.000246671,0.00005717069,0.000062108644,0.000048314734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984884,0.00008840741,0.00024398719,0.00032485955,0.00050976773,0.00034454855],"domain_scores_gemma":[0.99954647,0.000028708222,0.000044479842,0.00025201344,0.000037487735,0.00009083818],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015472482,0.00027724885,0.00019743148,0.00021236735,0.00057863205,0.000037950384,0.00015765104,0.00006802259,0.00021108221],"category_scores_gemma":[2.688246e-7,0.00030909677,0.00010220314,0.0004244178,0.000036825153,0.00027843454,0.0000020466898,0.00042974527,0.000017570752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000174815,0.000085874526,0.0000033126798,0.000038985465,0.00035824816,0.0000326247,0.00051911036,0.9942178,0.004001661,0.00010977367,0.00022467319,0.00023312987],"study_design_scores_gemma":[0.003636728,0.0011775325,0.000553358,0.00021716743,0.00062109757,0.00036051756,0.013205934,0.6892447,0.2874869,0.000036901536,0.0018932433,0.0015658995],"about_ca_topic_score_codex":0.00014603738,"about_ca_topic_score_gemma":0.000027325668,"teacher_disagreement_score":0.61571753,"about_ca_system_score_codex":0.0015428641,"about_ca_system_score_gemma":0.000019678495,"threshold_uncertainty_score":0.9999361},"labels":[],"label_agreement":null},{"id":"W4213055543","doi":"10.2139/ssrn.4011579","title":"Data Efficient Energy Disaggregation with Behind-the-Meter Energy Resources","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Metre; Energy (signal processing); Electricity meter; Business; Environmental science; Physics; Mathematics; Statistics","score_opus":0.0062353943177991585,"score_gpt":0.1777537055217314,"score_spread":0.17151831120393224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213055543","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40546465,0.02136586,0.55577403,0.0034156232,0.0028005126,0.0002415191,0.0000666012,0.00072694494,0.010144276],"genre_scores_gemma":[0.99658304,0.0008299533,0.000055866953,0.00014156841,0.00047293672,0.0000367464,0.00006593198,0.00006431954,0.0017496559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974098,0.00012157812,0.00024434194,0.00024944489,0.00058674294,0.0013880937],"domain_scores_gemma":[0.9991276,0.000045517834,0.000090202666,0.000656908,0.000020715568,0.000059038655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010025381,0.00019054467,0.00013694767,0.00015477692,0.00052181684,0.00008932124,0.0010392602,0.000024587027,0.00008000208],"category_scores_gemma":[0.000008088133,0.00014237729,0.000050100156,0.00027563178,0.000037817765,0.00012726917,0.0003528486,0.0008967233,0.0000032624712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003911924,0.00003762603,0.00008515993,0.00000262042,0.0003542365,0.000010798769,0.00015391664,0.94529265,0.0000764227,0.035541315,0.0025314405,0.015874686],"study_design_scores_gemma":[0.0008076495,0.00034398556,0.0001851632,0.000013306232,0.00013965229,0.000667975,0.001580284,0.2680861,0.00019013986,0.005407141,0.72213984,0.00043877505],"about_ca_topic_score_codex":0.00014456238,"about_ca_topic_score_gemma":0.0021098307,"teacher_disagreement_score":0.71960837,"about_ca_system_score_codex":0.0009696092,"about_ca_system_score_gemma":0.00017537188,"threshold_uncertainty_score":0.5805977},"labels":[],"label_agreement":null},{"id":"W4214511582","doi":"10.1007/978-3-030-96592-1_6","title":"Characterization of Residential Electricity Customers via Deep Ensemble Learning","year":2022,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Identification (biology); Computer science; Ensemble learning; Classifier (UML); Consumption (sociology); Stock (firearms); Machine learning; Household income; Environmental economics; Ensemble forecasting; Demand response; Artificial intelligence; Engineering; Economics","score_opus":0.0034040364641537714,"score_gpt":0.19265634423942427,"score_spread":0.1892523077752705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214511582","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063297627,0.010422256,0.080303006,0.00030058212,0.00060679956,0.0008590053,0.000013816314,0.0012915448,0.8998732],"genre_scores_gemma":[0.8300236,0.16363518,0.0011912864,0.00007015563,0.000020662308,0.00021135191,0.001119061,0.000057340843,0.0036713667],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990837,0.000019845986,0.0005442103,0.00008446584,0.00014774434,0.00012002964],"domain_scores_gemma":[0.99919,0.000031709762,0.00031575235,0.00039175493,0.00005628521,0.000014524554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015644812,0.00015180692,0.00022045593,0.0010750123,0.00008887042,0.000013973591,0.00032095108,0.00020074211,0.00010502902],"category_scores_gemma":[0.000020962365,0.00019518977,0.000025928213,0.00022083212,0.00008625616,0.00079781405,0.00020597188,0.0005540855,0.0000120050445],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023115103,0.00000938235,0.00011200945,0.00023850359,0.000045618945,5.932329e-7,0.0004158098,0.08945839,0.00062211044,0.45596308,0.000027495644,0.4530839],"study_design_scores_gemma":[0.00026263154,0.00004346646,0.00007539034,0.00005338574,0.00001558035,0.0000057468365,0.00011616622,0.022387862,0.0012098945,0.0075192926,0.9680702,0.0002403539],"about_ca_topic_score_codex":0.000006350117,"about_ca_topic_score_gemma":0.000039916788,"teacher_disagreement_score":0.96804273,"about_ca_system_score_codex":0.00014603358,"about_ca_system_score_gemma":0.000009964299,"threshold_uncertainty_score":0.7959608},"labels":[],"label_agreement":null},{"id":"W4214722396","doi":"10.1109/tpwrs.2022.3153431","title":"A Conceptual Analysis of Equilibrium Bidding Strategy in a Combined Oligopoly and Oligopsony Wholesale Electricity Market","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Bidding; Oligopoly; Economics; Demand curve; Nash equilibrium; Pareto principle; Microeconomics; Mathematical economics; Partial equilibrium; Supply and demand; Game theory; Supply; Competition (biology); Computer science; General equilibrium theory; Cournot competition; Operations management","score_opus":0.010238596067931227,"score_gpt":0.20498869935868655,"score_spread":0.19475010329075532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214722396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8616316,0.00040085183,0.13098751,0.00001808617,0.0011376163,0.0003580886,0.00013872633,0.00021895183,0.005108621],"genre_scores_gemma":[0.9992814,0.000024177552,0.000009589296,0.0000147005685,0.0000055680716,0.00016567878,0.0000055382393,0.000034420977,0.000458927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985172,0.00014722612,0.00045168702,0.00026495033,0.0003139366,0.0003049756],"domain_scores_gemma":[0.99944925,0.00010103544,0.0000615427,0.00029524663,0.000022381442,0.00007051862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003170545,0.00019522112,0.0004504089,0.0010701554,0.00006900904,0.000033253447,0.00016882202,0.000054486554,0.0002324104],"category_scores_gemma":[0.0000016430257,0.00023088323,0.000118039025,0.0019574144,0.000046404195,0.00010932683,0.000004377623,0.00025492517,0.0000018444206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004674602,0.00009629902,0.00026730186,0.000039954106,0.00074933,0.000011782809,0.0004774542,0.9949924,0.0025730785,0.0002611671,0.00043120605,0.000053289088],"study_design_scores_gemma":[0.000974235,0.00029757942,0.0030580165,0.000030261974,0.00035884354,0.000008074737,0.0019929784,0.9897904,0.0018969846,0.0000043811133,0.0012451623,0.00034308116],"about_ca_topic_score_codex":0.0004216083,"about_ca_topic_score_gemma":0.00013453717,"teacher_disagreement_score":0.13764985,"about_ca_system_score_codex":0.00023262388,"about_ca_system_score_gemma":0.000020083397,"threshold_uncertainty_score":0.9415145},"labels":[],"label_agreement":null},{"id":"W4214817779","doi":"10.36227/techrxiv.19282859.v1","title":"Energy Scheduling in IoE-Enabled Smart Grids Using Probabilistic Delayed Double Deep Q-Learning (P3DQL) Algorithm","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Probabilistic logic; Algorithm; Artificial intelligence; Smart grid; Dimensionality reduction; Deep learning; Scheduling (production processes); Curse of dimensionality; Machine learning; Mathematical optimization; Mathematics; Engineering; Electrical engineering","score_opus":0.01598730054866467,"score_gpt":0.22789439138229092,"score_spread":0.21190709083362624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214817779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13649558,0.0017592744,0.8110747,0.000050376246,0.006995387,0.0009969851,0.00001142819,0.0027644548,0.039851837],"genre_scores_gemma":[0.7922154,0.0007267207,0.19962706,0.00014712727,0.0012372042,0.001647702,0.0008295423,0.00077800703,0.0027912285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958856,0.00018046967,0.0010565512,0.0011074162,0.00068032276,0.0010896024],"domain_scores_gemma":[0.9984868,0.00011406742,0.00016711355,0.0009518412,0.0000849199,0.00019525942],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00082225393,0.0008518426,0.00087472616,0.00091616804,0.00022669519,0.00025694614,0.0008139791,0.00042382212,0.0012756637],"category_scores_gemma":[0.00003924688,0.0010171062,0.00025378758,0.00082979654,0.000045696695,0.00019169395,0.003183317,0.0019571101,0.000018757404],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000268931,0.000060196733,0.0002780666,0.0003222415,0.00030096277,0.00012382622,0.00017398584,0.9907324,0.00010419274,0.0014221404,0.00007387656,0.0063812668],"study_design_scores_gemma":[0.000986419,0.00003671726,0.00010535136,0.00013892326,0.00011794672,0.000011211818,0.00030930087,0.9875475,0.00021286517,0.0009800346,0.00847466,0.0010790393],"about_ca_topic_score_codex":0.00440411,"about_ca_topic_score_gemma":0.0009999807,"teacher_disagreement_score":0.6557198,"about_ca_system_score_codex":0.0020099576,"about_ca_system_score_gemma":0.00012422683,"threshold_uncertainty_score":0.9996373},"labels":[],"label_agreement":null},{"id":"W4220696591","doi":"10.3390/en15072482","title":"Investigation and Field Measurements for Demand Side Management Control Technique of Smart Air Conditioners located at Residential, Commercial, and Industrial Sites","year":2022,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Thermostat; Air conditioning; Power-line communication; Transformer; Automotive engineering; Engineering; Electrical engineering; Voltage; Temperature control; Power consumption; Telecommunications; Power (physics); Control engineering; Mechanical engineering","score_opus":0.030789627629599307,"score_gpt":0.21812896500107412,"score_spread":0.18733933737147482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220696591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99234074,0.00039246355,0.004975303,0.00041384745,0.00039131512,0.0007792733,0.00002714525,0.00016677298,0.0005131293],"genre_scores_gemma":[0.99831426,0.000060489805,0.00055029,0.0001641225,0.00004695936,0.00065487355,0.00006719703,0.000022728025,0.0001190668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991782,0.00006138998,0.0002448796,0.0001660115,0.00020077007,0.0001487997],"domain_scores_gemma":[0.99963045,0.00010001081,0.00006283778,0.00013935556,0.000026601874,0.000040723517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003229255,0.00013215406,0.00017895363,0.00017388306,0.00018723308,0.000018138679,0.00008559312,0.000049137612,0.000023173452],"category_scores_gemma":[0.000028595645,0.00015256836,0.000027392656,0.00012521632,0.00006001847,0.000093641924,0.00014004773,0.00007296506,2.8024084e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024288241,0.000022990245,0.015076205,0.0003247939,0.0005836974,0.0000063278912,0.00024805003,0.8378389,0.05042971,0.0020500275,0.09229561,0.00088079274],"study_design_scores_gemma":[0.009253091,0.0006338485,0.023971591,0.00016518761,0.000656243,0.000011998908,0.0010300982,0.018097693,0.8991018,0.0025344235,0.043551933,0.0009920707],"about_ca_topic_score_codex":0.000074349075,"about_ca_topic_score_gemma":0.000114888004,"teacher_disagreement_score":0.8486721,"about_ca_system_score_codex":0.00008549557,"about_ca_system_score_gemma":0.000006892092,"threshold_uncertainty_score":0.6221557},"labels":[],"label_agreement":null},{"id":"W4220926473","doi":"10.1155/2022/5486948","title":"The Network Global Optimal Mapping Approach Utilizing a Discrete Firefly Optimization Algorithm","year":2022,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Firefly algorithm; Computer science; Affine transformation; Global optimization; Algorithm; Global Map; Set (abstract data type); Artificial neural network; Transformation (genetics); Function (biology); Local search (optimization); Mathematical optimization; Artificial intelligence; Mathematics; Particle swarm optimization","score_opus":0.0072625541973679614,"score_gpt":0.20681032405337726,"score_spread":0.1995477698560093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220926473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02164643,0.0010360535,0.9750008,0.00007769098,0.0014787382,0.00013729437,0.000011330598,0.0000726985,0.00053893897],"genre_scores_gemma":[0.6151524,0.00045368006,0.38377982,0.00003613822,0.000398848,0.000040205927,0.00007792389,0.000036201152,0.000024791438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875844,0.000036152273,0.00048670633,0.0001015252,0.00038389643,0.00023325601],"domain_scores_gemma":[0.99955136,0.000030108095,0.00020067736,0.00011068246,0.00005610029,0.0000510801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033367288,0.0001268197,0.00015240956,0.000035907353,0.00032313532,0.000034449553,0.00019747362,0.000021752285,0.000010785479],"category_scores_gemma":[0.000004714291,0.00011192257,0.00010527848,0.0004361827,0.000018097733,0.00032408015,0.000007713344,0.00022121247,2.757296e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034987075,0.000011132377,0.00012582434,0.000013284554,0.000082543054,0.000014006958,0.00031596757,0.9836246,0.00001765853,0.0002768883,0.00024661506,0.015236541],"study_design_scores_gemma":[0.000692136,0.000081332044,0.011155843,0.000024247227,0.000057144545,0.00002363778,0.0026946897,0.96923107,0.000013106089,0.00016975748,0.015689543,0.00016752192],"about_ca_topic_score_codex":0.0000017772696,"about_ca_topic_score_gemma":0.0000024070644,"teacher_disagreement_score":0.593506,"about_ca_system_score_codex":0.00021903584,"about_ca_system_score_gemma":0.0000217182,"threshold_uncertainty_score":0.456407},"labels":[],"label_agreement":null},{"id":"W4221135459","doi":"10.1002/9781119078166.ch11","title":"Reinforcement Learning‐Based Filter","year":2022,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Reinforcement learning; Inference; Computer science; Artificial intelligence; Reinforcement; Equivalence (formal languages); Maximization; Machine learning; Unsupervised learning; Mathematical optimization; Mathematics; Engineering","score_opus":0.007194081828015181,"score_gpt":0.18051730712349884,"score_spread":0.17332322529548366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221135459","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[4.4955897e-7,0.0001397132,0.019900074,0.000022421595,0.0009110655,0.0001383774,0.0000021563276,0.0022363325,0.9766494],"genre_scores_gemma":[0.00053493754,0.000049440034,0.00054666563,0.0002169673,0.00024435433,0.00012155895,0.00016335616,0.0006755631,0.99744713],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992847,0.000013652809,0.00011567514,0.00015873254,0.00022457336,0.00020267407],"domain_scores_gemma":[0.9995995,0.000009831116,0.00002336896,0.00032632682,0.0000024932713,0.000038435897],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000051792536,0.00020687807,0.00015001639,0.00024016119,0.000021917722,0.000016093261,0.00017688675,0.00007089915,0.4318637],"category_scores_gemma":[0.0000035911225,0.00021309663,0.00006516107,0.00009745395,0.000007664032,0.000010255786,0.00008645539,0.00021078343,0.00081842626],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.1241657e-7,0.0000016107327,0.000007385666,0.00003706242,0.000050938666,0.000004288165,0.000002105477,0.48678362,6.573003e-7,0.00014251097,0.5128032,0.00016628914],"study_design_scores_gemma":[0.00014304578,0.000016598133,0.000008408242,0.000011566296,0.000017665781,1.7025263e-7,0.0000072516646,0.09296961,0.000018463625,0.0000012020984,0.9065757,0.00023032284],"about_ca_topic_score_codex":0.00004900679,"about_ca_topic_score_gemma":0.000027601101,"teacher_disagreement_score":0.43104526,"about_ca_system_score_codex":0.00012331526,"about_ca_system_score_gemma":0.0000060248926,"threshold_uncertainty_score":0.9999595},"labels":[],"label_agreement":null},{"id":"W4224032255","doi":"10.1016/j.rser.2022.112446","title":"A review on the deployment of demand response programs with multiple aspects coexistence over smart grid platform","year":2022,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; École de Technologie Supérieure","funders":"","keywords":"Interdependence; Software deployment; Demand response; Computer science; Risk analysis (engineering); Process (computing); Domain (mathematical analysis); Smart grid; Order (exchange); Control (management); Process management; Management science; Operations research; Business; Engineering; Electricity","score_opus":0.03770221934989955,"score_gpt":0.2544881190819007,"score_spread":0.21678589973200119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224032255","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000007699892,0.9926158,0.00017018775,0.00003267857,0.00018624286,0.0027444582,0.000009549727,0.00014367046,0.0040897178],"genre_scores_gemma":[0.000011226108,0.99039817,0.00008614639,0.00032873327,0.000105935695,0.0048648007,0.00012190333,0.00017789345,0.003905185],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958311,0.00065805065,0.0013153026,0.00071075564,0.0005314039,0.000953413],"domain_scores_gemma":[0.9970036,0.0006955789,0.00055645243,0.0014941164,0.00006557919,0.00018465302],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0030848512,0.00096694095,0.0029893634,0.00027616305,0.00031559131,0.00008751666,0.00070691947,0.00015399267,0.0001747629],"category_scores_gemma":[0.00027778835,0.0005711985,0.00052185694,0.0013996412,0.00011227336,0.0001630536,0.00043400592,0.00040380252,0.000005249331],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013114934,0.0001797022,0.0000048750735,0.3070292,0.0008432918,0.00029483464,0.00006149569,0.007870658,4.0914964e-7,0.0031625582,0.06065028,0.61977154],"study_design_scores_gemma":[0.0002372717,0.00035908888,6.0255445e-7,0.047187213,0.00084929256,0.00005385833,0.00010312048,0.00019275336,0.0000038465832,0.000031511052,0.9503661,0.0006153818],"about_ca_topic_score_codex":0.00062284875,"about_ca_topic_score_gemma":0.000223357,"teacher_disagreement_score":0.8897158,"about_ca_system_score_codex":0.0006025251,"about_ca_system_score_gemma":0.00022669378,"threshold_uncertainty_score":0.99967396},"labels":[],"label_agreement":null},{"id":"W4224136647","doi":"10.1109/tpec54980.2022.9750797","title":"A Data-driven Assessment Model for Demand Response Participation Benefit of Industries","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Engineering and Physical Sciences Research Council; Science Foundation Ireland","keywords":"Flexibility (engineering); Demand response; Computer science; Work (physics); Smart grid; Audit; Factory (object-oriented programming); Operator (biology); Cluster analysis; Load profile; Process (computing); Operations research; Environmental economics; Electricity; Business; Engineering; Electrical engineering; Economics","score_opus":0.07556801493023511,"score_gpt":0.3081731073991687,"score_spread":0.23260509246893357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224136647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4792113,0.0000161991,0.5192049,0.0001582782,0.00014063387,0.00022937423,0.00022057758,0.0001187095,0.00069999474],"genre_scores_gemma":[0.99010956,0.0000031426575,0.0086378595,0.000032912492,0.000017917337,0.0003245609,0.00016873935,0.000018095703,0.0006871885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993689,0.000021316535,0.00018676816,0.00012774137,0.00016453427,0.00013075862],"domain_scores_gemma":[0.9994619,0.00008202746,0.00002649355,0.00038395138,0.000019795476,0.000025855636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034148738,0.000069249305,0.00010012698,0.00007456386,0.000059965943,0.000010174383,0.00021347532,0.000017863365,0.00010730397],"category_scores_gemma":[0.000022580676,0.000074581134,0.000016475813,0.00012036617,0.000008713913,0.00011023712,0.00025312795,0.00005742014,6.2473924e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058471625,0.000025457195,0.00039866858,0.000016054213,0.00004912343,3.4792018e-7,0.000071577764,0.9812209,0.00044411985,0.003414771,0.013881518,0.00041901306],"study_design_scores_gemma":[0.00029092465,0.00005195157,0.0023991696,0.000002239478,0.00003048802,1.7462213e-7,0.0001314762,0.9871819,0.00050204655,0.00017969542,0.009149175,0.00008073008],"about_ca_topic_score_codex":0.0000076069696,"about_ca_topic_score_gemma":0.000042761927,"teacher_disagreement_score":0.5108983,"about_ca_system_score_codex":0.0000917642,"about_ca_system_score_gemma":0.000026138654,"threshold_uncertainty_score":0.30413306},"labels":[],"label_agreement":null},{"id":"W4224254674","doi":"10.3390/jrfm15040168","title":"What If? Electricity as Money","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Economics; Intermediation; Context (archaeology); Environmental economics; Business; Energy transition; Incentive; Industrial organization; Commerce; Microeconomics; Engineering; Finance; Electrical engineering","score_opus":0.0036650668612654685,"score_gpt":0.17730861384611574,"score_spread":0.17364354698485027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224254674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9254199,0.00769663,0.052592743,0.00022214463,0.007031761,0.00027277254,0.000005611973,0.000102420825,0.0066560116],"genre_scores_gemma":[0.9800292,0.018626517,0.0005475085,0.00017347532,0.00027340217,0.000014263435,0.0000010890383,0.000019593079,0.00031494812],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990319,0.000036457608,0.00029340363,0.000099943805,0.00033787353,0.00020039169],"domain_scores_gemma":[0.9996656,0.000020928552,0.0001038961,0.0001223506,0.000021545016,0.00006566413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004241131,0.00011846066,0.00018176985,0.00027948286,0.0001664005,0.000069304755,0.00018892517,0.00001955405,0.00006533997],"category_scores_gemma":[0.00001578158,0.000120167904,0.000078842895,0.0003051109,0.000012182965,0.00024839622,0.00017143604,0.00028884626,0.000006679944],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011124109,0.00011402735,0.0014872018,0.000068755646,0.0001371596,0.0004914975,0.00069563783,0.46419433,0.000024892735,0.0107449675,0.025713421,0.4962169],"study_design_scores_gemma":[0.00086086383,0.00027777877,0.029503893,0.000024747455,0.0001382498,0.00004791135,0.00079342164,0.0040440755,0.000081404665,0.00484732,0.9591505,0.00022982513],"about_ca_topic_score_codex":0.000012799475,"about_ca_topic_score_gemma":0.0000036738668,"teacher_disagreement_score":0.9334371,"about_ca_system_score_codex":0.00012806707,"about_ca_system_score_gemma":0.000008025453,"threshold_uncertainty_score":0.4900305},"labels":[],"label_agreement":null},{"id":"W4225015109","doi":"10.1016/j.ijepes.2022.108196","title":"Hierarchical economic control of air-conditioning loads to compensate for fluctuations in distributed photovoltaic generation","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Scheduling (production processes); Photovoltaic system; Computer science; Demand response; Automatic Generation Control; Mathematical optimization; Engineering; Electric power system; Electricity; Power (physics); Electrical engineering","score_opus":0.007246212863560143,"score_gpt":0.2236387530604243,"score_spread":0.21639254019686416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225015109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27068183,0.0003179898,0.72298145,0.00042489776,0.004830259,0.00023673926,0.00023582992,0.00003371733,0.00025731273],"genre_scores_gemma":[0.9988459,0.0000098865785,0.00022855551,0.0001318844,0.00047362858,0.000120038814,0.00012408568,0.000024863844,0.000041170235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824035,0.00009771483,0.00089116313,0.00013964892,0.000422588,0.0002085388],"domain_scores_gemma":[0.9991923,0.00019506417,0.00022414411,0.00010341975,0.00019802223,0.00008704541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040423987,0.0001321895,0.0003128467,0.00065716286,0.00005366899,0.000036252903,0.00037567853,0.000039234514,0.000056336132],"category_scores_gemma":[0.00006621509,0.00014483157,0.0001369833,0.00021815943,0.000014294102,0.0001306276,0.00003959792,0.0001792803,0.0000017805451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000100541554,0.000059035843,0.00024119657,0.0000029586554,0.0002447826,0.000014746907,0.000038112677,0.95451665,0.024108164,0.015567573,0.0049598655,0.00014638189],"study_design_scores_gemma":[0.0018661146,0.00033210622,0.0015871011,0.000023391018,0.000026491382,0.00007210796,0.00003472079,0.95252806,0.0034243464,0.00031391345,0.039609414,0.00018223641],"about_ca_topic_score_codex":0.0001251366,"about_ca_topic_score_gemma":0.000038316266,"teacher_disagreement_score":0.7281641,"about_ca_system_score_codex":0.0010833193,"about_ca_system_score_gemma":0.00007710035,"threshold_uncertainty_score":0.59060603},"labels":[],"label_agreement":null},{"id":"W4225565544","doi":"10.1109/access.2022.3162587","title":"Stacking Battery Energy Storage Revenues in Future Distribution Networks","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nortel (Canada)","funders":"Interreg; European Commission","keywords":"Profitability index; Revenue; Payback period; Computer science; Scheduling (production processes); Sizing; Stacking; Service (business); Capital cost; Environmental economics; Business; Reliability engineering; Operations research; Risk analysis (engineering); Operations management; Economics; Finance; Engineering; Microeconomics; Production (economics); Electrical engineering; Marketing","score_opus":0.008602643849605992,"score_gpt":0.2120408743097336,"score_spread":0.2034382304601276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225565544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73685926,0.0018671561,0.24503286,0.0003078581,0.013724329,0.00016310743,0.00008163497,0.0005486192,0.0014151923],"genre_scores_gemma":[0.99830294,0.00013551743,0.000011127584,0.000166103,0.0010068218,0.0001170418,0.00015614612,0.000031636388,0.00007267767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991773,0.000055564575,0.00016589828,0.00016773869,0.00017450473,0.00025904525],"domain_scores_gemma":[0.9996757,0.000021124395,0.000029382138,0.00023394517,0.000008382309,0.000031499516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015044594,0.00011898088,0.000120793164,0.00008522102,0.000090304995,0.000064814136,0.00035821987,0.000035444726,0.00009191937],"category_scores_gemma":[0.000002469968,0.00014465235,0.00003275294,0.00041790656,0.0000076106053,0.0002493251,0.00016059943,0.00021306284,0.0000017609483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004781991,0.00001231344,0.002051784,0.000013580336,0.0000147686915,0.000047108962,0.000034707467,0.95344305,0.000036996153,0.00020541192,0.040464293,0.0036711984],"study_design_scores_gemma":[0.0004094402,0.000020909898,0.036548264,0.000029642595,0.000015650081,0.00000570698,0.00011566132,0.49059096,0.00049482565,0.0001894704,0.47113967,0.00043978635],"about_ca_topic_score_codex":0.00009188813,"about_ca_topic_score_gemma":0.00013053828,"teacher_disagreement_score":0.4628521,"about_ca_system_score_codex":0.00032204736,"about_ca_system_score_gemma":0.0000054210586,"threshold_uncertainty_score":0.58987516},"labels":[],"label_agreement":null},{"id":"W4226169936","doi":"10.22215/etd/2022-14871","title":"Evaluation of High-Rise Building-Based Hydroelectric Systems for Improving Energy Efficiency at the Urban Scale","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Government of Canada","keywords":"Hydroelectricity; Cost of electricity by source; Electricity; Pumped-storage hydroelectricity; Turbine; Environmental science; Electricity generation; Engineering; Environmental engineering; Efficient energy use; Civil engineering; Renewable energy; Distributed generation; Power (physics); Electrical engineering; Mechanical engineering","score_opus":0.0073843871019292455,"score_gpt":0.22272990962890557,"score_spread":0.21534552252697634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226169936","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8512442,0.020435935,0.0974527,0.000027936936,0.01162494,0.0031600166,0.0000743785,0.0007828477,0.015197042],"genre_scores_gemma":[0.9914505,0.000028779992,0.00009041498,0.000008424391,0.00019737601,0.002094401,0.0009511714,0.00011812577,0.0050608297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99750435,0.00012453183,0.00049523596,0.0003628037,0.0011869356,0.00032615522],"domain_scores_gemma":[0.99881715,0.00016559035,0.00021531596,0.00051745184,0.00024614285,0.000038379705],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014155839,0.0003052104,0.00032328095,0.00038793898,0.00020306118,0.000040184997,0.00038450977,0.0001310161,0.00020838571],"category_scores_gemma":[0.00007305639,0.000261848,0.00016061126,0.00053500343,0.000012139477,0.000048019923,0.00003424398,0.00012578123,0.0000019706727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021183472,0.000027608874,0.000006098381,0.00044248893,0.00009067328,2.0661433e-7,0.000057249934,0.9862238,0.002494003,0.0009909109,0.004648651,0.0049971114],"study_design_scores_gemma":[0.00055763044,0.00009195901,0.000088795685,0.000031108666,0.0006284326,3.3495576e-7,0.00013660893,0.97304255,0.020356104,0.000034838136,0.0047536646,0.00027798204],"about_ca_topic_score_codex":0.0014784622,"about_ca_topic_score_gemma":0.001010886,"teacher_disagreement_score":0.14020628,"about_ca_system_score_codex":0.0010675896,"about_ca_system_score_gemma":0.00012740541,"threshold_uncertainty_score":0.9999834},"labels":[],"label_agreement":null},{"id":"W4230024542","doi":"10.4018/978-1-7998-9152-9.ch017","title":"Economically Optimal Solar Power Generation","year":2021,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Agriculture Environmental Renewal Canada (Canada); University of Ottawa","funders":"","keywords":"Electricity; Profitability index; Grid parity; Stand-alone power system; Renewable energy; Environmental economics; Electricity retailing; Electricity generation; Installation; Consumption (sociology); Business; Solar power; Photovoltaic system; Electrical engineering; Engineering; Economics; Power (physics); Finance; Electricity market; Distributed generation; Mechanical engineering","score_opus":0.01194774886580309,"score_gpt":0.19161617236130946,"score_spread":0.17966842349550638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230024542","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00077745155,0.00042925752,0.0037760546,0.00002339456,0.0023221197,0.00015291895,0.000057943347,0.0003772174,0.99208367],"genre_scores_gemma":[0.3429217,0.00012967702,0.014193609,0.0017593007,0.0067266384,0.00012667125,0.0003047155,0.00075707573,0.6330806],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987614,0.0000066833322,0.00035605076,0.00039817716,0.00017995657,0.00029770078],"domain_scores_gemma":[0.99926317,0.0000068577465,0.000052136613,0.0005127869,0.000044787896,0.00012025096],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005782235,0.00041735696,0.0003566333,0.00005241572,0.000043407086,0.0001268788,0.00022135345,0.00035017243,0.00040722502],"category_scores_gemma":[0.0000036579195,0.00050760456,0.00019971776,0.00000784097,0.000028775568,0.000047176505,0.00014198637,0.00022154019,0.00047263785],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029172093,0.0000026224006,0.0000012472865,0.000016178483,0.00027010794,0.000083162326,0.000009355411,0.08333325,0.00009923253,0.88964105,0.025577372,0.00096350204],"study_design_scores_gemma":[0.00039229394,0.000052233354,0.00002633574,0.000090284484,0.00014377153,0.000034988872,0.0000051776005,0.0137112215,0.0006505312,0.0069412827,0.9768182,0.0011336588],"about_ca_topic_score_codex":0.000006758099,"about_ca_topic_score_gemma":0.00005328002,"teacher_disagreement_score":0.95124084,"about_ca_system_score_codex":0.00050497806,"about_ca_system_score_gemma":0.00005302095,"threshold_uncertainty_score":0.99973756},"labels":[],"label_agreement":null},{"id":"W4230072215","doi":"10.32920/ryerson.14655963","title":"Optimization models for distribution planning and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Sizing; Smart grid; Grid; Electric power distribution; Renewable energy; Electric power system; Operations research; Reliability engineering; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Voltage","score_opus":0.021714361631857776,"score_gpt":0.22361995749775462,"score_spread":0.20190559586589685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230072215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003701265,0.00040460576,0.99306214,0.000045931814,0.0006242136,0.00026205982,0.00002409452,0.00026773417,0.0016079566],"genre_scores_gemma":[0.8997329,0.00025572933,0.09234938,0.000029605413,0.00021820143,0.00029663413,0.006928913,0.000043426433,0.00014522494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994926,0.0000069049765,0.00014102107,0.00019315428,0.00006572967,0.000100630685],"domain_scores_gemma":[0.9997656,0.000012920573,0.000015686575,0.00014114859,0.000039249153,0.000025412846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007178084,0.00012597366,0.00011834835,0.000031927997,0.00003724062,0.0001567477,0.000046035864,0.00011779197,0.000013608021],"category_scores_gemma":[0.0000074558116,0.00014160902,0.000027282998,0.000027515756,0.0000046486734,0.00013520445,0.00012168926,0.000081066166,2.476321e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013947293,0.0000029960984,0.000008855333,0.00015121528,0.00003671593,4.7304505e-7,0.000058437116,0.99665135,0.000013658948,0.0015100251,0.0012236054,0.00034124264],"study_design_scores_gemma":[0.00011324098,0.000004090392,0.000044979624,0.00005364137,0.000026177155,4.6982768e-7,0.000050347753,0.9986461,0.00038123404,0.00019450863,0.0003337047,0.00015153702],"about_ca_topic_score_codex":0.000009275095,"about_ca_topic_score_gemma":0.0000037154211,"teacher_disagreement_score":0.9007127,"about_ca_system_score_codex":0.000084636005,"about_ca_system_score_gemma":0.0000086585815,"threshold_uncertainty_score":0.5774648},"labels":[],"label_agreement":null},{"id":"W4232338362","doi":"10.32920/ryerson.14645877.v1","title":"Demand side management in smart grid","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Demand response; Smart grid; HVAC; Peak demand; Grid; Load shifting; Demand side; Computer science; Load management; Electricity; Reduction (mathematics); Consumption (sociology); Demand management; Environmental economics; Economics; Air conditioning; Electrical engineering; Engineering; Mathematics","score_opus":0.010109723238308369,"score_gpt":0.20348612704084962,"score_spread":0.19337640380254126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232338362","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12280287,0.0015640409,0.042216975,0.00025658193,0.009498497,0.00074467994,0.000005777185,0.0012546015,0.821656],"genre_scores_gemma":[0.9639248,0.0038308178,0.022788864,0.00040210778,0.0006815791,0.00068098924,0.00032576532,0.0002069543,0.007158121],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845517,0.000029966526,0.00039807925,0.00047724266,0.0002565882,0.00038293048],"domain_scores_gemma":[0.9990743,0.000018991323,0.00002499082,0.0007946488,0.000016099344,0.00007098809],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020146005,0.0003528902,0.00035148422,0.00031452702,0.000016061009,0.00012254607,0.00035351768,0.00017221498,0.00035420264],"category_scores_gemma":[0.0000048822644,0.00039669074,0.00011414365,0.0001972084,0.000012914118,0.00006115207,0.0012442312,0.00041788767,0.00008798035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001571409,0.000027459662,0.00062365446,0.0006154809,0.0002907477,0.00037053207,0.00006114864,0.9813016,0.000013030064,0.0008857534,0.013176584,0.0026324308],"study_design_scores_gemma":[0.002012109,0.000024148805,0.14784786,0.0014527326,0.00036863913,0.000014674504,0.0011481734,0.55720615,0.0037420944,0.0021570586,0.28049946,0.0035269004],"about_ca_topic_score_codex":0.00014483566,"about_ca_topic_score_gemma":0.00084511365,"teacher_disagreement_score":0.8411219,"about_ca_system_score_codex":0.00027237766,"about_ca_system_score_gemma":0.000010084692,"threshold_uncertainty_score":0.9998485},"labels":[],"label_agreement":null},{"id":"W4233104126","doi":"10.1016/j.rser.2015.01.046","title":"Home energy management systems: A review of modelling and complexity","year":2015,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":445,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Energy management; Operations research; Demand response; Scheduling (production processes); Energy consumption; Production (economics); Heuristic; Risk analysis (engineering); Energy management system; Smart grid; Electricity; Environmental economics; Engineering; Energy (signal processing); Operations management; Economics; Business","score_opus":0.055698009751168474,"score_gpt":0.26242148136257565,"score_spread":0.20672347161140717,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233104126","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[7.373017e-8,0.96256167,0.020160906,0.000006331526,0.00029495728,0.0009260106,0.000014319914,0.00014542496,0.015890302],"genre_scores_gemma":[0.0000010833957,0.9844745,0.00064721314,0.00006604106,0.00018184795,0.0010338107,0.00020968312,0.00016270143,0.013223146],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956167,0.00031640823,0.0019621802,0.00075758516,0.00041788537,0.0009292803],"domain_scores_gemma":[0.99777466,0.000065399174,0.0005243194,0.001116814,0.00018265942,0.00033617223],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019283543,0.0010233716,0.0051432094,0.0005279874,0.0001222627,0.00010333584,0.00047917783,0.0002811975,0.000020276066],"category_scores_gemma":[0.000018117418,0.000856101,0.00040991127,0.0009749363,0.00011364561,0.00023034551,0.00060897664,0.0001818192,0.0000033997364],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014623947,0.000019095627,9.199897e-8,0.64022094,0.00036134542,0.00006090142,0.000006685091,0.02402833,8.955757e-9,0.03462147,0.026530193,0.2741495],"study_design_scores_gemma":[0.00015592678,0.00003081204,1.186853e-8,0.116481796,0.0013690013,0.000045085722,0.000049436898,0.0060195616,1.4432494e-7,0.0005388904,0.874613,0.0006963196],"about_ca_topic_score_codex":0.001341911,"about_ca_topic_score_gemma":0.000018779509,"teacher_disagreement_score":0.84808284,"about_ca_system_score_codex":0.00040343276,"about_ca_system_score_gemma":0.000094411385,"threshold_uncertainty_score":0.999389},"labels":[],"label_agreement":null},{"id":"W4233692268","doi":"10.2139/ssrn.3243665","title":"The Economics of Grid-Scale Electricity Storage: Location Heterogeneity and Business Models","year":2018,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Grid; Scale (ratio); Electricity; Business model; Business; Environmental economics; Economics; Geography; Engineering; Electrical engineering; Cartography; Marketing","score_opus":0.006353595307176042,"score_gpt":0.18853947392542564,"score_spread":0.18218587861824959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233692268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8442067,0.0026692743,0.15182032,0.000104979954,0.00046215148,0.00006997209,8.872566e-7,0.000038115333,0.0006275933],"genre_scores_gemma":[0.98737603,0.011985194,0.00009118371,0.000013889684,0.00045646055,0.000004192093,0.0000012948601,0.000023154851,0.00004861813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987114,0.000028592294,0.00022813358,0.000108197455,0.0000898693,0.0008338043],"domain_scores_gemma":[0.9995486,0.000024445886,0.0000739395,0.00017982566,0.00013303319,0.00004016753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075676903,0.00011589376,0.000120957564,0.000068133006,0.00018412407,0.000045326025,0.00019921576,0.000043939977,0.0000011806865],"category_scores_gemma":[0.00001187165,0.000095584124,0.000030223797,0.00020750286,0.000070245,0.00020593546,0.00003539983,0.0003739807,0.0000028498066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050485844,0.000031466803,0.0008291644,0.000027614988,0.00032734318,3.5520654e-7,0.00009357633,0.9030056,0.00053881697,0.0697967,0.0002966033,0.02500226],"study_design_scores_gemma":[0.0010306682,0.00034604865,0.009025072,0.000026089101,0.00010681403,0.00020956165,0.00032467907,0.84461844,0.006147507,0.13307539,0.00462089,0.0004688127],"about_ca_topic_score_codex":0.000038868195,"about_ca_topic_score_gemma":0.0023708588,"teacher_disagreement_score":0.15172914,"about_ca_system_score_codex":0.00052057544,"about_ca_system_score_gemma":0.00020591042,"threshold_uncertainty_score":0.38978076},"labels":[],"label_agreement":null},{"id":"W4234873233","doi":"10.32920/ryerson.14653368","title":"Power management of a grid-connected distributed energy resource system","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Energy storage; Grid; Renewable energy; Distributed generation; Wind power; Software; Graphical user interface; Intermittent energy source; MATLAB; Automotive engineering; Grid energy storage; Electric power system; Power (physics); Electrical engineering; Engineering; Operating system","score_opus":0.0054230046481540195,"score_gpt":0.17374855045713813,"score_spread":0.16832554580898412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234873233","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04629132,0.0021252665,0.5316937,0.00010616735,0.006603992,0.0006237275,0.0002818596,0.003956901,0.40831706],"genre_scores_gemma":[0.9940916,0.0001637504,0.0026535236,0.000027320291,0.00015820852,0.00020790352,0.0014603399,0.00012464207,0.001112718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977502,0.00006773624,0.00071126706,0.00058371184,0.00046359788,0.00042344013],"domain_scores_gemma":[0.9982036,0.00003547514,0.000121526304,0.0014313095,0.00009289705,0.00011523562],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016607277,0.0004986977,0.00066098326,0.00021979252,0.00003058883,0.00008425594,0.0005964602,0.00028568774,0.0002879547],"category_scores_gemma":[0.000005377091,0.0005310121,0.00026212467,0.0004038384,0.000027950337,0.000041155894,0.0014916939,0.00027258272,0.000010560528],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010394144,0.000051157043,0.000025453419,0.0034327537,0.0020386209,0.00028385135,0.00006501896,0.94227296,0.000071394155,0.023760598,0.02763654,0.00035124173],"study_design_scores_gemma":[0.002465989,0.00008412612,0.006986176,0.007894334,0.0012593033,0.000041155174,0.010486465,0.47218075,0.018929388,0.0001311319,0.47565708,0.0038841013],"about_ca_topic_score_codex":0.00014047672,"about_ca_topic_score_gemma":0.000025036215,"teacher_disagreement_score":0.9478003,"about_ca_system_score_codex":0.00042967865,"about_ca_system_score_gemma":0.000016196775,"threshold_uncertainty_score":0.99971414},"labels":[],"label_agreement":null},{"id":"W4235146912","doi":"10.1002/9781119453550.ch1","title":"Introduction","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; British Columbia Institute of Technology","funders":"","keywords":"Smart grid; Microgrid; Distributed generation; Renewable energy; Variety (cybernetics); Computer science; Electricity generation; Electricity; Grid; Electric power system; Distributed computing; Work (physics); Process (computing); Resource (disambiguation); Systems engineering; Power (physics); Engineering; Electrical engineering; Computer network","score_opus":0.0028764846230624874,"score_gpt":0.15626883708305717,"score_spread":0.1533923524599947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235146912","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.073421e-7,0.0001587961,0.005826507,0.0000727713,0.0050238543,0.00006123916,6.8895133e-7,0.0014675219,0.9873883],"genre_scores_gemma":[0.000013904433,0.00010646194,0.000555888,0.000017315777,0.003748853,0.000006065172,0.000014813047,0.00039004345,0.99514663],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997545,0.0000015897506,0.00003764579,0.00008550389,0.000050485207,0.00007025873],"domain_scores_gemma":[0.9997487,9.975863e-7,0.0000057351567,0.00023331918,0.0000013221037,0.000009919],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0000117530535,0.00008310587,0.000071983464,0.00010084745,0.0000015588545,0.000006195865,0.000052308627,0.00006589571,0.01219521],"category_scores_gemma":[7.5080794e-7,0.00007991013,0.000016231039,0.00003764,0.0000027292574,0.000008257153,0.000012556022,0.000042632342,0.008438806],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.7284534e-8,8.8233287e-7,8.764543e-7,0.000032425225,0.000037533835,2.505606e-7,7.091702e-7,0.016302599,0.000005261366,0.0018743055,0.9809037,0.00084142335],"study_design_scores_gemma":[0.000029269657,0.0000016374395,0.000004659172,0.000005492076,0.000005801074,2.4130836e-7,0.0000014739987,0.0015611794,0.0000314032,0.0000029536823,0.99826264,0.000093251445],"about_ca_topic_score_codex":0.000017003576,"about_ca_topic_score_gemma":0.000016962731,"teacher_disagreement_score":0.01735896,"about_ca_system_score_codex":0.000022614684,"about_ca_system_score_gemma":9.114681e-7,"threshold_uncertainty_score":0.99233323},"labels":[],"label_agreement":null},{"id":"W4235853182","doi":"10.26868/25222708.2019.210320","title":"A Co-simulation Framework for Assessing the Interaction between Heat Pumps and the Low Voltage Grid on a District Scale","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"Ministerio de Economía y Competitividad; European Commission","keywords":"Grid; Scale (ratio); Computer science; Voltage; Environmental science; Mechanical engineering; Electrical engineering; Engineering; Physics; Geology","score_opus":0.03683016792284666,"score_gpt":0.30979432731807277,"score_spread":0.2729641593952261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235853182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44120488,0.000012274298,0.5565446,0.0010343269,0.00019005389,0.00050034624,0.0000060946622,0.00021771209,0.00028973658],"genre_scores_gemma":[0.9970401,0.00000862823,0.0015165203,0.0003035876,0.0009670982,0.00009708337,0.00001900151,0.000040929106,0.0000070552883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883866,0.000016441656,0.00032804938,0.00030943652,0.00026706376,0.00024034239],"domain_scores_gemma":[0.99828506,0.0012928068,0.00009788335,0.00010989372,0.00013995003,0.000074419644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035245015,0.00022807247,0.0002300716,0.00007424863,0.00034967135,0.00063644414,0.0001996654,0.00008633191,0.00001223312],"category_scores_gemma":[0.0005190539,0.00016305386,0.00006942201,0.00028739404,0.000073557916,0.0005032153,0.000042000556,0.00030805834,0.000004677936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056137,0.000005923926,0.0047730766,0.000119612174,0.000040741408,1.08588445e-7,0.0013355679,0.98018867,0.0004233167,0.00719621,0.000104333056,0.0057563083],"study_design_scores_gemma":[0.0006269092,0.000029676896,0.0062868097,0.00016992493,0.0000611289,2.7432446e-7,0.00042477626,0.98573184,0.001231499,0.0022903772,0.002958479,0.00018827817],"about_ca_topic_score_codex":0.00000881593,"about_ca_topic_score_gemma":4.3336408e-7,"teacher_disagreement_score":0.5558352,"about_ca_system_score_codex":0.00008822572,"about_ca_system_score_gemma":0.000009873805,"threshold_uncertainty_score":0.66491437},"labels":[],"label_agreement":null},{"id":"W4238083102","doi":"10.32920/ryerson.14668311.v1","title":"Appliance scheduling optimization with micro-grid in smart home network","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Renewable energy; Photovoltaic system; Demand response; Computer science; Schedule; Electricity; Scheduling (production processes); Grid; Energy management; Engineering; Operations management; Electrical engineering; Energy (signal processing)","score_opus":0.007406659930030577,"score_gpt":0.18113812600874865,"score_spread":0.17373146607871806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238083102","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04393421,0.0014050476,0.93960917,0.00007877818,0.0026766649,0.0003967955,0.0000024775193,0.00065220613,0.011244669],"genre_scores_gemma":[0.19894232,0.0012026211,0.7969314,0.00016773779,0.0012583325,0.0003747429,0.00044656143,0.0001977126,0.00047857803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985905,0.000022598828,0.00032391745,0.00047546084,0.0001851803,0.0004023396],"domain_scores_gemma":[0.9992671,0.000020619611,0.000048074005,0.0005637772,0.000041293766,0.00005914638],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016029914,0.00034590164,0.00036990424,0.00012284525,0.000027627631,0.00014799295,0.00026316676,0.0002072427,0.00012683992],"category_scores_gemma":[0.0000041520857,0.00036331496,0.00005410954,0.00039305494,0.000017361363,0.00008827432,0.00038756055,0.0005191681,0.000017183685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053255026,0.000012684392,0.002553047,0.00025597983,0.00009232999,0.000032440646,0.000034819113,0.99605006,0.000016518845,0.00008017542,0.00067375816,0.00019283735],"study_design_scores_gemma":[0.0002777042,0.0000060290217,0.0018221097,0.00053830136,0.000026152973,0.000002693676,0.00005729103,0.9948502,0.00025700702,0.000020578234,0.0016174997,0.0005244313],"about_ca_topic_score_codex":0.00007312264,"about_ca_topic_score_gemma":0.00030457068,"teacher_disagreement_score":0.1550081,"about_ca_system_score_codex":0.00022138636,"about_ca_system_score_gemma":0.0000362785,"threshold_uncertainty_score":0.99988186},"labels":[],"label_agreement":null},{"id":"W4240410148","doi":"10.32920/ryerson.14668311","title":"Appliance scheduling optimization with micro-grid in smart home network","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Renewable energy; Photovoltaic system; Demand response; Computer science; Schedule; Electricity; Scheduling (production processes); Energy management; Grid; Energy management system; Engineering; Electrical engineering; Operations management; Energy (signal processing)","score_opus":0.007406659930030577,"score_gpt":0.18113812600874865,"score_spread":0.17373146607871806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240410148","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04393421,0.0014050476,0.93960917,0.00007877818,0.0026766649,0.0003967955,0.0000024775193,0.00065220613,0.011244669],"genre_scores_gemma":[0.19894232,0.0012026211,0.7969314,0.00016773779,0.0012583325,0.0003747429,0.00044656143,0.0001977126,0.00047857803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985905,0.000022598828,0.00032391745,0.00047546084,0.0001851803,0.0004023396],"domain_scores_gemma":[0.9992671,0.000020619611,0.000048074005,0.0005637772,0.000041293766,0.00005914638],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016029914,0.00034590164,0.00036990424,0.00012284525,0.000027627631,0.00014799295,0.00026316676,0.0002072427,0.00012683992],"category_scores_gemma":[0.0000041520857,0.00036331496,0.00005410954,0.00039305494,0.000017361363,0.00008827432,0.00038756055,0.0005191681,0.000017183685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053255026,0.000012684392,0.002553047,0.00025597983,0.00009232999,0.000032440646,0.000034819113,0.99605006,0.000016518845,0.00008017542,0.00067375816,0.00019283735],"study_design_scores_gemma":[0.0002777042,0.0000060290217,0.0018221097,0.00053830136,0.000026152973,0.000002693676,0.00005729103,0.9948502,0.00025700702,0.000020578234,0.0016174997,0.0005244313],"about_ca_topic_score_codex":0.00007312264,"about_ca_topic_score_gemma":0.00030457068,"teacher_disagreement_score":0.1550081,"about_ca_system_score_codex":0.00022138636,"about_ca_system_score_gemma":0.0000362785,"threshold_uncertainty_score":0.99988186},"labels":[],"label_agreement":null},{"id":"W4241063860","doi":"10.1016/j.procs.2015.05.113","title":"The 5th International Conference on Sustainable Energy Information Technology (SEIT) Preface","year":2015,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Computer science; Energy (signal processing); Sustainable energy; Data science; Electrical engineering; Renewable energy","score_opus":0.011642455183533499,"score_gpt":0.21471164386906166,"score_spread":0.20306918868552817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241063860","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012055035,0.00006018774,0.915105,0.0028941375,0.0038287134,0.00018922829,8.458845e-7,0.00083944446,0.065027416],"genre_scores_gemma":[0.99491924,0.00003825152,0.0043721786,0.00019279461,0.00013996955,0.000053503634,0.0000021960864,0.000006112577,0.00027573918],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989945,0.0000038858366,0.00014063678,0.00014186426,0.00040161025,0.0003174663],"domain_scores_gemma":[0.99929684,0.00001489539,0.000033391203,0.0002418994,0.00033799483,0.00007499557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032735593,0.000096910175,0.000057088124,0.0002496914,0.00014146545,0.00031323198,0.00095204636,0.000030246782,0.0000022828037],"category_scores_gemma":[0.000060621882,0.00007478174,0.000010417402,0.00063807674,0.00017120242,0.00087507226,0.00034715916,0.000083353254,0.00004267634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005504548,0.0000100136185,0.00011751721,0.000011331679,0.000009726702,0.000002504512,0.0003809986,0.2954613,0.0000371265,0.65201664,0.010102154,0.041845206],"study_design_scores_gemma":[0.00013466318,0.00004523519,0.00016511646,0.000008007332,0.0000011468155,0.0000047813555,0.00018345403,0.83699846,0.0015958745,0.0049495753,0.15581127,0.000102443955],"about_ca_topic_score_codex":0.000008270578,"about_ca_topic_score_gemma":0.0000037428824,"teacher_disagreement_score":0.9828642,"about_ca_system_score_codex":0.00021183625,"about_ca_system_score_gemma":0.00012277708,"threshold_uncertainty_score":0.30495107},"labels":[],"label_agreement":null},{"id":"W4241891821","doi":"10.24124/2017/1375","title":"Gridsim: a flexible simulator for grid integration study","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Grid; Renewable energy; Smart grid; Systems engineering; Computer science; Software; Greenhouse gas; Mars Exploration Program; Wind power; Focus (optics); Simulation; Distributed computing; Engineering; Operating system; Electrical engineering","score_opus":0.01948089271608355,"score_gpt":0.28929729994309544,"score_spread":0.2698164072270119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241891821","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26216757,0.00086156395,0.05997678,0.00006050502,0.069142185,0.010727369,0.00014115694,0.006110397,0.5908125],"genre_scores_gemma":[0.8486019,0.000040343442,0.0006406774,0.000020643178,0.0017660215,0.0012545398,0.0027597533,0.00021742847,0.14469874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989142,0.00000879716,0.0003057308,0.0003097789,0.00021679596,0.00024473056],"domain_scores_gemma":[0.9991192,0.000039027134,0.00007892188,0.00061211694,0.000096159696,0.000054529562],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014911231,0.00034058915,0.0003275726,0.0002045289,0.0001397679,0.00017024345,0.0003433161,0.00017030358,0.00014691654],"category_scores_gemma":[0.000055752233,0.00032394443,0.00011930673,0.00006236022,0.0000053153744,0.00017227845,0.000013531426,0.00015724849,0.00006919941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019131154,0.0003539338,0.0003401302,0.001011445,0.0012633145,0.00001119408,0.0017815774,0.6887506,0.00042384298,0.0023783485,0.25701267,0.046481602],"study_design_scores_gemma":[0.004204325,0.0008728917,0.019100843,0.0004356403,0.0010808243,8.9121755e-7,0.008242442,0.5775673,0.022201965,0.00084619893,0.3625485,0.0028981834],"about_ca_topic_score_codex":0.0000782691,"about_ca_topic_score_gemma":0.0016940121,"teacher_disagreement_score":0.5864343,"about_ca_system_score_codex":0.00011656463,"about_ca_system_score_gemma":0.000022369575,"threshold_uncertainty_score":0.99992126},"labels":[],"label_agreement":null},{"id":"W4242269186","doi":"10.32920/ryerson.14663079","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Environmental economics; Electricity; Grid; Electric power system; Electricity generation; Distributed generation; Environmental science; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.02209325686729482,"score_gpt":0.23459497470373933,"score_spread":0.2125017178364445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242269186","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013044949,0.0027131857,0.9584299,0.000038028247,0.012599344,0.00039713018,0.00003593484,0.0018262187,0.0109153325],"genre_scores_gemma":[0.955747,0.00020386491,0.036459196,0.00013563292,0.0016703457,0.0013801802,0.001160489,0.00031894172,0.0029243159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977936,0.000059241105,0.0005922857,0.00067979365,0.00030887243,0.000566193],"domain_scores_gemma":[0.99837524,0.00023786216,0.000102711834,0.0010278374,0.000108174856,0.00014819617],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023233806,0.0006239643,0.00074409787,0.00027428815,0.00006746832,0.00043363706,0.00055882643,0.0007370992,0.00012968924],"category_scores_gemma":[0.000091999354,0.00064502686,0.00025487258,0.0002469152,0.000020093912,0.00008639372,0.00050874485,0.00071649987,0.000010375332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000072903676,0.000017669756,0.000024345029,0.0007448858,0.00060885824,0.000052657244,0.00015575229,0.97259885,0.00008493114,0.014328071,0.010863123,0.00051356934],"study_design_scores_gemma":[0.00018664951,0.00001583577,0.000029577075,0.0011016997,0.000098139935,0.0000035411026,0.00064208556,0.9067647,0.00084003335,0.0006321145,0.088939846,0.0007457927],"about_ca_topic_score_codex":0.00047078278,"about_ca_topic_score_gemma":0.000045117893,"teacher_disagreement_score":0.9427021,"about_ca_system_score_codex":0.0004365252,"about_ca_system_score_gemma":0.00005956253,"threshold_uncertainty_score":0.9996001},"labels":[],"label_agreement":null},{"id":"W4242864714","doi":"10.32920/ryerson.14649462","title":"Residential energy management systems with renewables and battery energy storage","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"Mitacs","keywords":"Renewable energy; Energy management; Demand response; Computer science; Variety (cybernetics); Controller (irrigation); Model predictive control; Environmental economics; Energy consumption; Energy storage; Transactive memory; Control (management); Risk analysis (engineering); Industrial engineering; Operations research; Electricity; Energy (signal processing); Engineering; Business; Economics; Artificial intelligence; Knowledge management","score_opus":0.005733752006449119,"score_gpt":0.16494873826689338,"score_spread":0.15921498626044425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242864714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021051217,0.0100248745,0.8592963,0.00015227363,0.00699008,0.0003177116,0.000019224432,0.00172238,0.10042589],"genre_scores_gemma":[0.9657843,0.006347231,0.0046463776,0.0001685527,0.00090490415,0.00056657696,0.00034682176,0.00026831374,0.020966915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976451,0.000080399455,0.00045435526,0.0008257634,0.0005117835,0.0004826382],"domain_scores_gemma":[0.9985849,0.00003096172,0.00008284549,0.0010899723,0.000054001437,0.00015727755],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014074097,0.00061323773,0.0005796242,0.00039527458,0.0000725294,0.00060374604,0.00037820011,0.000251166,0.000114198665],"category_scores_gemma":[0.0000017628488,0.0005896905,0.00008462028,0.00018509892,0.00004749041,0.0001383051,0.001319205,0.0001695205,0.0000020535476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000102642125,0.000019507994,0.000064593376,0.0010963187,0.0010918234,0.0004756005,0.000029229666,0.9471518,0.000039748225,0.0061311983,0.043233156,0.00065677817],"study_design_scores_gemma":[0.0018966907,0.00010458182,0.001826388,0.0031761937,0.0011225725,0.00012147853,0.001689194,0.5464088,0.0034703247,0.0003758992,0.4358045,0.0040034037],"about_ca_topic_score_codex":0.0034235972,"about_ca_topic_score_gemma":0.002822945,"teacher_disagreement_score":0.9447331,"about_ca_system_score_codex":0.00022351189,"about_ca_system_score_gemma":0.000025433861,"threshold_uncertainty_score":0.9996554},"labels":[],"label_agreement":null},{"id":"W4243484317","doi":"10.26868/25222708.2019.210568","title":"Linear Discriminant Analysis for Classification of a Large Virtual Smart Meter Data Set With Known Building Parameters","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Institut de Valorisation des Données","keywords":"Linear discriminant analysis; Discriminant; Data set; Computer science; Set (abstract data type); Optimal discriminant analysis; Smart meter; Metre; Pattern recognition (psychology); Artificial intelligence; Data mining; Engineering; Smart grid","score_opus":0.10546978171914595,"score_gpt":0.3129414925858361,"score_spread":0.20747171086669014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243484317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42130944,0.000008730693,0.5778726,0.00018520482,0.000054387525,0.00027525082,0.00007032885,0.00016981,0.000054240136],"genre_scores_gemma":[0.95077646,0.0000076275355,0.0487237,0.000061745464,0.00009170339,0.000058907823,0.00022011764,0.00004838967,0.000011321378],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99823815,0.000009909069,0.00049483654,0.00057751767,0.00033832787,0.0003412605],"domain_scores_gemma":[0.9989101,0.00015449295,0.00020311696,0.00030379478,0.00030693342,0.0001215314],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003631319,0.0002705725,0.00042084078,0.00029746498,0.00009357322,0.000113998256,0.0005131612,0.00008839714,0.000018786299],"category_scores_gemma":[0.00026571468,0.00025208725,0.000090788424,0.00094455405,0.000043345495,0.0006652443,0.00016244079,0.00012881844,0.000002102228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000111566434,0.000028618668,0.014119809,0.00027860876,0.00074141176,4.3690437e-7,0.0012301665,0.9548012,0.017604215,0.0097083645,0.00024806126,0.0011275465],"study_design_scores_gemma":[0.00057771674,0.00012387472,0.0052768216,0.00006537439,0.00072636775,2.5022382e-7,0.0005318891,0.9852836,0.004162314,0.000065476765,0.002878289,0.0003080255],"about_ca_topic_score_codex":0.0000128763295,"about_ca_topic_score_gemma":0.000008756202,"teacher_disagreement_score":0.52946705,"about_ca_system_score_codex":0.000056677563,"about_ca_system_score_gemma":0.000024287123,"threshold_uncertainty_score":0.99999315},"labels":[],"label_agreement":null},{"id":"W4244444641","doi":"10.32920/ryerson.14645877","title":"Demand side management in smart grid","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Smart grid; Demand response; HVAC; Grid; Peak demand; Demand side; Load shifting; Computer science; Load management; Electricity; Consumption (sociology); Reduction (mathematics); Demand management; Consumer demand; Environmental economics; Microeconomics; Economics; Air conditioning; Electrical engineering; Engineering; Mathematics","score_opus":0.010109723238308369,"score_gpt":0.20348612704084962,"score_spread":0.19337640380254126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244444641","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12280287,0.0015640409,0.042216975,0.00025658193,0.009498497,0.00074467994,0.000005777185,0.0012546015,0.821656],"genre_scores_gemma":[0.9639248,0.0038308178,0.022788864,0.00040210778,0.0006815791,0.00068098924,0.00032576532,0.0002069543,0.007158121],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845517,0.000029966526,0.00039807925,0.00047724266,0.0002565882,0.00038293048],"domain_scores_gemma":[0.9990743,0.000018991323,0.00002499082,0.0007946488,0.000016099344,0.00007098809],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020146005,0.0003528902,0.00035148422,0.00031452702,0.000016061009,0.00012254607,0.00035351768,0.00017221498,0.00035420264],"category_scores_gemma":[0.0000048822644,0.00039669074,0.00011414365,0.0001972084,0.000012914118,0.00006115207,0.0012442312,0.00041788767,0.00008798035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001571409,0.000027459662,0.00062365446,0.0006154809,0.0002907477,0.00037053207,0.00006114864,0.9813016,0.000013030064,0.0008857534,0.013176584,0.0026324308],"study_design_scores_gemma":[0.002012109,0.000024148805,0.14784786,0.0014527326,0.00036863913,0.000014674504,0.0011481734,0.55720615,0.0037420944,0.0021570586,0.28049946,0.0035269004],"about_ca_topic_score_codex":0.00014483566,"about_ca_topic_score_gemma":0.00084511365,"teacher_disagreement_score":0.8411219,"about_ca_system_score_codex":0.00027237766,"about_ca_system_score_gemma":0.000010084692,"threshold_uncertainty_score":0.9998485},"labels":[],"label_agreement":null},{"id":"W4245808815","doi":"10.1016/s1464-2859(19)30237-8","title":"HPS, Ballard link for energy self-sufficient homes, crowd-funding","year":2019,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Independence (probability theory); Power (physics); Engineering; Stack (abstract data type); German; Energy (signal processing); Telecommunications; Business; Computer science; Geography; Physics; Operating system; Mathematics","score_opus":0.00476077812719072,"score_gpt":0.16990353285722898,"score_spread":0.16514275473003825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245808815","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1120702,0.01209326,0.16406196,0.004844377,0.039001722,0.0032061294,0.00014091884,0.0084776515,0.6561038],"genre_scores_gemma":[0.9559346,0.0012141649,0.017309597,0.0008586236,0.0016804582,0.00023524935,0.000116761585,0.00031124818,0.02233933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983241,0.000024175664,0.00032812287,0.0004015154,0.0002694119,0.0006526797],"domain_scores_gemma":[0.99913275,0.00011851449,0.000050449766,0.00051610975,0.00004677624,0.00013539604],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00026245718,0.0003071843,0.0002916571,0.00016097195,0.000059732905,0.00009392477,0.00035767027,0.00014172372,0.0012327222],"category_scores_gemma":[0.000010530478,0.00033275175,0.00015539197,0.00017815157,0.000014171176,0.000033540007,0.00012862204,0.00013529995,0.0015460356],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024859857,0.000100368634,0.00017068487,0.0010460641,0.00023377084,0.000016675194,0.0002342237,0.5457877,0.004535695,0.008209939,0.438245,0.0013950459],"study_design_scores_gemma":[0.0005878918,0.000070260314,0.00011746553,0.000035072706,0.000031579097,0.0000017499434,0.000047244142,0.034152064,0.004618401,0.00003760752,0.9599013,0.0003994122],"about_ca_topic_score_codex":0.000030172481,"about_ca_topic_score_gemma":0.0000067103224,"teacher_disagreement_score":0.8438644,"about_ca_system_score_codex":0.00020161178,"about_ca_system_score_gemma":0.0000145449685,"threshold_uncertainty_score":0.99991244},"labels":[],"label_agreement":null},{"id":"W4246711449","doi":"10.32920/ryerson.14665155","title":"A multi-level optimization technique for electricity consumption management and pricing in residential neighborhoods","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Energy management; Smart grid; Demand response; Revenue; Energy consumption; Electricity; Environmental economics; Operations research; Business; Energy (signal processing); Engineering; Economics","score_opus":0.02948659525984441,"score_gpt":0.2543964155637073,"score_spread":0.2249098203038629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246711449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074322554,0.00036196483,0.9889429,0.000024973464,0.0004404184,0.0018048314,0.0000068354284,0.00031053263,0.0006752667],"genre_scores_gemma":[0.28981832,0.0019831087,0.7058778,0.000032724784,0.000073788615,0.0016676192,0.00018871535,0.00007616924,0.00028173692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862695,0.00003694856,0.00040617332,0.0004886939,0.00015180529,0.00028940983],"domain_scores_gemma":[0.99949235,0.000034866927,0.000060652616,0.00032419225,0.00004518885,0.00004277795],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031156602,0.00028743956,0.0002949391,0.00048969674,0.000038458842,0.00013588586,0.00014968897,0.0002432506,0.00002936767],"category_scores_gemma":[0.000020902182,0.00034556157,0.00006139266,0.00019194813,0.0000129526115,0.00010201736,0.00043344,0.0002691351,7.2317795e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009263113,0.000035595986,0.000509926,0.0013106382,0.000115942625,0.000011442836,0.000044122116,0.99567455,0.0005591209,0.00027351093,0.00019294905,0.0012629523],"study_design_scores_gemma":[0.00069195696,0.000010639333,0.018502275,0.00029186648,0.00007604594,0.0000023907112,0.00003314908,0.9747838,0.00509908,0.00007103208,0.00005207138,0.0003857175],"about_ca_topic_score_codex":0.000077136785,"about_ca_topic_score_gemma":0.00021060577,"teacher_disagreement_score":0.2830651,"about_ca_system_score_codex":0.0003397381,"about_ca_system_score_gemma":0.000014905634,"threshold_uncertainty_score":0.9998996},"labels":[],"label_agreement":null},{"id":"W4246924798","doi":"10.5383/swes.8.01.006","title":"Smart Home System for Energy Saving using Genetic- Fuzzy-Neural Networks Approach","year":2016,"lang":"en","type":"article","venue":"International Journal of Sustainable Water and Environmental Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Home automation; Computer science; Artificial neural network; Fuzzy logic; Genetic algorithm; Fuzzy control system; Energy (signal processing); Smart grid; Control (management); Artificial intelligence; Engineering; Machine learning; Telecommunications","score_opus":0.0055990153596761965,"score_gpt":0.16722739993316885,"score_spread":0.16162838457349266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246924798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5633827,0.0010752174,0.43284777,0.000026026708,0.0021926756,0.00014938672,0.000009392552,0.000033211672,0.00028360653],"genre_scores_gemma":[0.9980857,0.00011619096,0.00037887867,0.000010107651,0.0009116208,0.000022706301,0.00001037431,0.000042854135,0.00042161],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986761,0.000031572465,0.00046279354,0.00014289243,0.00029933016,0.00038731055],"domain_scores_gemma":[0.99964315,0.000026077649,0.00009417641,0.00009779054,0.00003849566,0.00010034107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025505645,0.00017719048,0.00022208702,0.00017355442,0.00007386581,0.00011410883,0.00023687082,0.00006320718,0.0000041387284],"category_scores_gemma":[0.0000020004054,0.0001145106,0.0000890773,0.000022915634,0.000039370836,0.0003295352,0.00012324158,0.00005332496,6.550773e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005842776,0.000025477264,0.0033868968,0.00013103192,0.00036951178,0.00014913769,0.00010455594,0.98748386,0.0061194096,0.0007877829,0.00016579893,0.0012181244],"study_design_scores_gemma":[0.0030096052,0.00016585358,0.0024713532,0.0002593075,0.00013852832,0.0020166137,0.008075682,0.95753187,0.00258456,0.0001231501,0.022993755,0.0006297199],"about_ca_topic_score_codex":0.000055083558,"about_ca_topic_score_gemma":3.042549e-7,"teacher_disagreement_score":0.43470296,"about_ca_system_score_codex":0.00079749,"about_ca_system_score_gemma":0.0000037593982,"threshold_uncertainty_score":0.46696067},"labels":[],"label_agreement":null},{"id":"W4247344955","doi":"10.22215/etd/2012-09486","title":"Stochastic optimization in green wireless netowrks and smart grids","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"University of Connecticut","keywords":"Computer science; Wireless; Telecommunications","score_opus":0.006150016979635056,"score_gpt":0.19593071730532405,"score_spread":0.189780700325689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247344955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5705315,0.0025579636,0.25762123,0.000060260252,0.009305886,0.0013286138,0.000013406206,0.0014344454,0.1571467],"genre_scores_gemma":[0.9883144,0.00015939077,0.00097507413,0.000021205564,0.00031362288,0.00012742351,0.001213928,0.00013273887,0.008742208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991794,0.000011358294,0.00023421382,0.00018386995,0.00014119694,0.00024992134],"domain_scores_gemma":[0.99969876,0.00002076441,0.000029891296,0.00016723035,0.000019366122,0.00006401897],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000081171114,0.00024409988,0.00022194424,0.0002659185,0.00002094559,0.000028497165,0.000093949464,0.00020979787,0.00017737367],"category_scores_gemma":[0.00000448815,0.000264472,0.00002476773,0.00016754425,0.000007589062,0.0001377468,0.000019395806,0.00018089,0.000016565113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066981625,0.000009630639,0.00022518991,0.00019565692,0.00003544434,0.0000016932745,0.00021361881,0.9941879,0.000022615726,0.00036249997,0.00047465233,0.0042644185],"study_design_scores_gemma":[0.00030335423,0.000012105816,0.026606131,0.00012032615,0.000058281545,0.0000012979648,0.00021842653,0.9716855,0.00005459965,0.000025435584,0.00047096136,0.00044356988],"about_ca_topic_score_codex":0.0003837451,"about_ca_topic_score_gemma":0.0023864137,"teacher_disagreement_score":0.41778293,"about_ca_system_score_codex":0.00008402941,"about_ca_system_score_gemma":0.000007666194,"threshold_uncertainty_score":0.99998075},"labels":[],"label_agreement":null},{"id":"W4247811216","doi":"10.22215/etd/2018-13368","title":"Economic Optimization of Campus Energy System Using Real Time Pricing","year":2018,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Greenhouse gas; Grid; Battery (electricity); Energy storage; Capacity optimization; Automotive engineering; Thermal energy storage; Electric potential energy; Grid energy storage; Energy (signal processing); Generator (circuit theory); Computer science; Electrical engineering; Process engineering; Environmental economics; Engineering; Distributed generation; Renewable energy; Power (physics); Economics","score_opus":0.004138519465690159,"score_gpt":0.18925399066010218,"score_spread":0.18511547119441202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247811216","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24104153,0.0001303371,0.13098113,0.0000010299598,0.0067377356,0.00026776548,0.000013995445,0.0011742557,0.6196522],"genre_scores_gemma":[0.88070136,0.000497478,0.07725464,0.000009739166,0.002733736,0.00007868658,0.0042104237,0.0007554308,0.03375849],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990702,0.0000140536795,0.00042046056,0.00020810374,0.000109556466,0.00017761055],"domain_scores_gemma":[0.9994837,0.000013642735,0.00015124165,0.00026964364,0.000045791952,0.000035976493],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000077452605,0.00023304445,0.0003278248,0.00026687182,0.000032851924,0.00002366213,0.00014306048,0.00019587763,0.00019777738],"category_scores_gemma":[0.0000022211862,0.00026102536,0.00006805676,0.00008741455,0.000007787157,0.00009242946,0.000017947752,0.000044594606,0.000031592874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059685467,0.0000027304889,0.0000056678005,0.0003609714,0.00013162916,0.0000011425144,0.000060066275,0.99657255,0.0007277812,0.001019,0.0008839873,0.00022850544],"study_design_scores_gemma":[0.00010024465,0.000012030219,0.00003187967,0.0002133482,0.0000898341,0.0000014823177,0.00017803178,0.9920762,0.0067166286,0.0000022931217,0.00034267132,0.00023534254],"about_ca_topic_score_codex":0.0009062404,"about_ca_topic_score_gemma":0.00024188029,"teacher_disagreement_score":0.6396599,"about_ca_system_score_codex":0.0005583117,"about_ca_system_score_gemma":0.000034593613,"threshold_uncertainty_score":0.9999842},"labels":[],"label_agreement":null},{"id":"W4248141281","doi":"10.22215/etd/2016-11327","title":"Increasing the Capacity of Photovoltaics Using Proton Exchange Membrane Fuel Cell Backup within a Residential Community","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Backup; Photovoltaic system; Proton exchange membrane fuel cell; Environmental economics; Photovoltaics; Renewable energy; Building-integrated photovoltaics; Tariff; Grid; Electricity generation; Business; Net metering; Engineering; Environmental science; Distributed generation; Fuel cells; Electrical engineering; Power (physics)","score_opus":0.026055890837895026,"score_gpt":0.23104983208052707,"score_spread":0.20499394124263204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248141281","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92459416,0.00028187444,0.00047347808,0.0000063826546,0.001470267,0.0011720466,0.000024854746,0.00022641037,0.07175051],"genre_scores_gemma":[0.9929854,0.00073365023,0.0025184934,0.000030783573,0.00036195078,0.00021637868,0.00024527914,0.00020988935,0.002698125],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980479,0.0003840469,0.0005828889,0.00020172063,0.0004603126,0.00032312435],"domain_scores_gemma":[0.9984568,0.00017927487,0.00026810076,0.00087001774,0.00016178045,0.000064077336],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011275923,0.00041481506,0.00043576755,0.00022309463,0.00022947845,0.00006121959,0.00057769933,0.00028910948,0.00031969007],"category_scores_gemma":[0.00007796778,0.00030401885,0.00012662358,0.0002778733,0.00006824333,0.00017643091,0.00010601607,0.0006769713,0.000012725046],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058079197,0.000286303,0.00055185816,0.04390053,0.00090612913,0.000015613052,0.019382372,0.034610547,0.89736766,0.00026416284,0.0016170914,0.0005169419],"study_design_scores_gemma":[0.0010884249,0.00006550919,0.0010701175,0.0012092607,0.00041369378,0.00001011621,0.0036550397,0.018367302,0.96778613,0.00044069224,0.004909852,0.000983846],"about_ca_topic_score_codex":0.011339507,"about_ca_topic_score_gemma":0.007942055,"teacher_disagreement_score":0.070418485,"about_ca_system_score_codex":0.00021175115,"about_ca_system_score_gemma":0.000053155134,"threshold_uncertainty_score":0.9999412},"labels":[],"label_agreement":null},{"id":"W4248338111","doi":"10.32920/ryerson.14656659","title":"Demand Side Simulation: Architecture and Performance","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Relational database management system; Context (archaeology); Smart grid; Demand response; Energy consumption; Efficient energy use; Simulation; Grid; Architecture; Distributed computing; Electricity; Database; Engineering; Relational database","score_opus":0.009062923102969305,"score_gpt":0.20045447281801188,"score_spread":0.19139154971504257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248338111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7924197,0.0011069629,0.1675943,0.00007603845,0.00091552926,0.00014678632,0.0000015089865,0.0004766688,0.03726252],"genre_scores_gemma":[0.993853,0.0003436934,0.0048501245,0.000063540436,0.00024207152,0.000021725858,0.00003255665,0.000033436252,0.0005598834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993356,0.000010275298,0.00015256916,0.00023441308,0.00011932013,0.00014785661],"domain_scores_gemma":[0.9995523,0.000033188597,0.000015591686,0.00033196423,0.000018685312,0.000048280774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059479884,0.00019542276,0.0001748696,0.00007209551,0.000027895185,0.000092006325,0.000097342425,0.0001234929,0.00010221329],"category_scores_gemma":[0.0000071878044,0.00019327672,0.000036725298,0.000053999203,0.000014201239,0.00004080833,0.00038611048,0.00028900467,0.000006140744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013003964,0.0000023698935,0.00055888196,0.0003876049,0.00006466351,0.000006158227,0.00009610807,0.990472,0.00001208807,0.000024375864,0.00015706799,0.008217349],"study_design_scores_gemma":[0.00009347928,0.0000059676154,0.015992433,0.00008429657,0.000024823219,0.0000027671626,0.000017151353,0.9762834,0.0003683659,0.000067443965,0.0068159956,0.00024390187],"about_ca_topic_score_codex":0.0000066481266,"about_ca_topic_score_gemma":0.000027317472,"teacher_disagreement_score":0.20143329,"about_ca_system_score_codex":0.000033941054,"about_ca_system_score_gemma":0.000008238023,"threshold_uncertainty_score":0.78815955},"labels":[],"label_agreement":null},{"id":"W4248917212","doi":"10.5383/ijtee.14.01.007","title":"Techno-Economic Study of PV System for Household Electricity Generation in Almadinah AlMunawwarah","year":2017,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Taibah University","keywords":"Photovoltaic system; Air conditioning; Electricity; Refrigeration; Cooling load; Coefficient of performance; Environmental science; Automotive engineering; Inverter; Architectural engineering; Engineering; Electrical engineering; Heat pump; Mechanical engineering; Voltage","score_opus":0.010486975975015234,"score_gpt":0.18693887486210264,"score_spread":0.1764518988870874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248917212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962265,0.00012208387,0.0027980236,0.000012184983,0.0006657794,0.000095526775,0.000008790361,0.000012650116,0.00005844952],"genre_scores_gemma":[0.99944204,0.000054563996,0.00023128913,0.0000017660032,0.000232115,0.000009363116,0.0000023535247,0.000017703642,0.000008811571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944824,0.0000035945754,0.00027673287,0.000067129375,0.00011806565,0.00008623959],"domain_scores_gemma":[0.9997521,0.000011126492,0.00011166559,0.000095693584,0.000004099724,0.000025328945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013162704,0.00009054791,0.00013685277,0.00014030364,0.00002412272,0.000029513827,0.00024901103,0.000027869231,0.0000025195022],"category_scores_gemma":[0.0000049639934,0.00009094851,0.000038871076,0.000007938396,0.000009896852,0.00020472589,0.000050263396,0.00007318725,3.5953474e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016704065,0.00004207824,0.005995681,0.000014202506,0.00013558762,0.000010968416,0.0000622974,0.9494986,0.042569965,0.000051185307,0.000010148906,0.00159256],"study_design_scores_gemma":[0.0014729174,0.00014512498,0.08017491,0.000045245906,0.00002993244,0.00003448997,0.00015730488,0.8948065,0.02271935,0.0000043143714,0.00027163586,0.00013827559],"about_ca_topic_score_codex":0.00003435376,"about_ca_topic_score_gemma":0.000006026444,"teacher_disagreement_score":0.07417923,"about_ca_system_score_codex":0.00024880876,"about_ca_system_score_gemma":0.0000020774214,"threshold_uncertainty_score":0.37087724},"labels":[],"label_agreement":null},{"id":"W4248984144","doi":"10.22215/etd/2012-06947","title":"Usage monitoring of electrical devices in a smart home","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transient (computer programming); Waveform; Electrical load; Electrical equipment; Electric power; Electrical network; Computer science; Power (physics); Electric power system; Transient state; Electrical engineering; Power consumption; Engineering; Electronic engineering; Real-time computing; Voltage","score_opus":0.009967869129221653,"score_gpt":0.22969342323832861,"score_spread":0.21972555410910696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248984144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9336255,0.0016065501,0.00010100373,0.000001517192,0.002011876,0.00011096276,7.362018e-7,0.00015639266,0.06238545],"genre_scores_gemma":[0.9964814,0.00015208965,0.00049725326,0.0000016069017,0.00022194833,0.000045891935,0.00005740358,0.00005133856,0.0024910497],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991122,0.000011112732,0.00028899536,0.00012646388,0.00019229877,0.00026896462],"domain_scores_gemma":[0.99969923,0.00003436171,0.00003730445,0.00016999632,0.000017110922,0.000042014857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102222504,0.00018581962,0.00026139375,0.0003529055,0.000008471646,0.000010966165,0.0001566521,0.00015883175,0.00007753482],"category_scores_gemma":[0.000007480207,0.00019303238,0.00005345654,0.00031197,0.0000031634122,0.00009617278,0.000012181309,0.00019078031,0.000036461115],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081762286,0.00029980342,0.8382858,0.0042918404,0.0007776654,0.00004038018,0.002092325,0.08410446,0.014558922,0.0035766358,0.0025428068,0.049347606],"study_design_scores_gemma":[0.00016619201,0.000014253263,0.98197114,0.00015406034,0.000041673306,3.7833047e-7,0.00017371484,0.0025072312,0.011415649,0.000020932359,0.0032137877,0.00032097424],"about_ca_topic_score_codex":0.0001456055,"about_ca_topic_score_gemma":0.00047205848,"teacher_disagreement_score":0.14368537,"about_ca_system_score_codex":0.000102147904,"about_ca_system_score_gemma":0.000008672754,"threshold_uncertainty_score":0.78716314},"labels":[],"label_agreement":null},{"id":"W4249387859","doi":"10.32920/ryerson.14643837","title":"Conceptual Framework for Enhancing Energy Disaggregation Using Crowd and Context","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Workflow; Computer science; Context (archaeology); Automation; Energy consumption; Data science; Crowdsourcing; Energy (signal processing); Audit; Data mining; Artificial intelligence; Database; World Wide Web; Engineering; Business","score_opus":0.023895260357764937,"score_gpt":0.24440239238746814,"score_spread":0.2205071320297032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249387859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09871152,0.002579966,0.8952027,0.00003826305,0.0023410143,0.00017440348,0.000008316589,0.00028838107,0.0006554294],"genre_scores_gemma":[0.9414665,0.00032398815,0.05696087,0.0001724938,0.0006208444,0.00011563663,0.00009940232,0.00008245549,0.000157773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998847,0.000022023245,0.00031994533,0.0003995893,0.00014078605,0.0002706439],"domain_scores_gemma":[0.99926883,0.00018061917,0.0000635701,0.00034945604,0.00006348034,0.00007406928],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010111127,0.0002981401,0.00034843176,0.00008405254,0.00006440922,0.0001843945,0.0001250888,0.0003257741,0.00009290523],"category_scores_gemma":[0.000075215474,0.00033798767,0.000098186,0.00007048013,0.000053029333,0.00009756978,0.0003385741,0.00022874912,8.2074354e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006831455,0.000013342899,0.00008358435,0.00037188033,0.00036719147,0.000006375266,0.000981098,0.83795136,0.001267089,0.14658383,0.00053698296,0.011830441],"study_design_scores_gemma":[0.0005418102,0.000027323702,0.00016978162,0.0014003139,0.00021966164,0.0000057748207,0.0038339915,0.9217592,0.045981754,0.008182796,0.016641214,0.0012364115],"about_ca_topic_score_codex":0.00020964006,"about_ca_topic_score_gemma":0.00062321656,"teacher_disagreement_score":0.842755,"about_ca_system_score_codex":0.00017132607,"about_ca_system_score_gemma":0.000030724506,"threshold_uncertainty_score":0.9999072},"labels":[],"label_agreement":null},{"id":"W4250369619","doi":"10.1109/sasg.2017.8356562","title":"IEEE copyright and consent form","year":2017,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Residence; Energy storage; Electricity; Environmental economics; Residence time (fluid dynamics); Energy (signal processing); Battery (electricity); Computer science; Business; Telecommunications; Electrical engineering; Economics; Engineering; Power (physics)","score_opus":0.019432152403642617,"score_gpt":0.2250554170827368,"score_spread":0.20562326467909417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250369619","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3162345,0.0000569786,0.0063961297,0.000255692,0.0011095087,0.00006573317,9.0140736e-7,0.0002574628,0.67562306],"genre_scores_gemma":[0.99563485,0.00009212114,0.0005672546,0.00006994321,0.00008184674,0.000006098518,6.1076605e-7,0.00000974844,0.0035375126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99974424,0.0000010608022,0.000050391383,0.00006008327,0.00004645748,0.00009774206],"domain_scores_gemma":[0.999691,0.0000106174075,0.0000076236934,0.00025091725,0.000004588729,0.000035242465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003349955,0.00005478499,0.000055393386,0.000016922728,0.000080914986,0.00006513014,0.00008600179,0.00001712548,0.00009661278],"category_scores_gemma":[0.000003944249,0.000046598376,0.000010480942,0.0000056959707,0.000027980852,0.00008257414,0.00003133537,0.000024359777,0.00006395289],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010238905,0.000031489377,0.017927472,0.0003241521,0.00030512366,0.0000746198,0.00025819676,0.01962812,0.0038394467,0.058005977,0.88109356,0.01850162],"study_design_scores_gemma":[0.0010707161,0.00003007791,0.13893627,0.00003450402,0.00003245073,0.000012041781,0.000038166614,0.115920424,0.021294452,0.0014739888,0.7206629,0.0004940403],"about_ca_topic_score_codex":0.000033936412,"about_ca_topic_score_gemma":0.00012184342,"teacher_disagreement_score":0.6794003,"about_ca_system_score_codex":0.00001574323,"about_ca_system_score_gemma":0.0000016930641,"threshold_uncertainty_score":0.19002266},"labels":[],"label_agreement":null},{"id":"W4250682756","doi":"10.22215/etd/2020-14213","title":"Using Machine Learning and Deep Learning for Load disaggregation and Recognition of Activities in Household","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Benchmark (surveying); Computer science; Artificial intelligence; Machine learning; Consumption (sociology); Energy (signal processing); Random forest; Ensemble learning; Demand response; Electricity; Energy consumption; Term (time); Demand forecasting; Operations research; Engineering; Statistics; Geography; Mathematics","score_opus":0.025759366528386018,"score_gpt":0.23484912242613784,"score_spread":0.20908975589775183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250682756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9882011,0.0013897114,0.007831816,0.0000053283784,0.00021958756,0.00026876605,0.0000042956794,0.00016019212,0.0019192242],"genre_scores_gemma":[0.99448,0.0013873663,0.0030059516,0.0000037248258,0.00006446699,0.000038304857,0.0005817371,0.00007683268,0.00036158823],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933964,0.000023507655,0.00021907693,0.00018471098,0.00011064582,0.00012240364],"domain_scores_gemma":[0.9997445,0.00008412395,0.000088906265,0.000036403242,0.000019262958,0.00002682476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010722887,0.00017555541,0.00024200426,0.0001714898,0.000042430533,0.00003305443,0.000026112968,0.00011364326,0.000008643831],"category_scores_gemma":[0.00007073387,0.00020312745,0.000027717258,0.00010448108,0.000010414533,0.00015379771,0.000014524901,0.0002217689,1.8821359e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003154963,0.000033426142,0.012348135,0.007557044,0.0003187875,0.0000060896036,0.0070004207,0.7237199,0.030618053,0.00019279723,0.000019592226,0.2178703],"study_design_scores_gemma":[0.0006615408,0.00007449149,0.0026626936,0.0004562624,0.000106644104,0.0000014517148,0.0028821386,0.9795413,0.012199572,0.00013599139,0.00091370364,0.00036421025],"about_ca_topic_score_codex":0.00015961849,"about_ca_topic_score_gemma":0.0010767867,"teacher_disagreement_score":0.25582144,"about_ca_system_score_codex":0.00007298875,"about_ca_system_score_gemma":0.0000073091546,"threshold_uncertainty_score":0.8283297},"labels":[],"label_agreement":null},{"id":"W4251344196","doi":"10.32920/ryerson.14656659.v1","title":"Demand Side Simulation: Architecture and Performance","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Relational database management system; Context (archaeology); Smart grid; Demand response; Energy consumption; Efficient energy use; Simulation; Grid; On demand; Architecture; Embedded system; Electricity; Database; Engineering; Relational database","score_opus":0.009062923102969305,"score_gpt":0.20045447281801188,"score_spread":0.19139154971504257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251344196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7924197,0.0011069629,0.1675943,0.00007603845,0.00091552926,0.00014678632,0.0000015089865,0.0004766688,0.03726252],"genre_scores_gemma":[0.993853,0.0003436934,0.0048501245,0.000063540436,0.00024207152,0.000021725858,0.00003255665,0.000033436252,0.0005598834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993356,0.000010275298,0.00015256916,0.00023441308,0.00011932013,0.00014785661],"domain_scores_gemma":[0.9995523,0.000033188597,0.000015591686,0.00033196423,0.000018685312,0.000048280774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059479884,0.00019542276,0.0001748696,0.00007209551,0.000027895185,0.000092006325,0.000097342425,0.0001234929,0.00010221329],"category_scores_gemma":[0.0000071878044,0.00019327672,0.000036725298,0.000053999203,0.000014201239,0.00004080833,0.00038611048,0.00028900467,0.000006140744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013003964,0.0000023698935,0.00055888196,0.0003876049,0.00006466351,0.000006158227,0.00009610807,0.990472,0.00001208807,0.000024375864,0.00015706799,0.008217349],"study_design_scores_gemma":[0.00009347928,0.0000059676154,0.015992433,0.00008429657,0.000024823219,0.0000027671626,0.000017151353,0.9762834,0.0003683659,0.000067443965,0.0068159956,0.00024390187],"about_ca_topic_score_codex":0.0000066481266,"about_ca_topic_score_gemma":0.000027317472,"teacher_disagreement_score":0.20143329,"about_ca_system_score_codex":0.000033941054,"about_ca_system_score_gemma":0.000008238023,"threshold_uncertainty_score":0.78815955},"labels":[],"label_agreement":null},{"id":"W4251812827","doi":"10.1088/1755-1315/431/1/011001","title":"Preface","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Library science; China; Beijing; Research center; Political science; Technical university; Engineering; Computer science","score_opus":0.010948733083656183,"score_gpt":0.16598987506051885,"score_spread":0.15504114197686267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251812827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98651385,0.00010181059,0.0005407285,0.00035983155,0.00012835585,0.00007302909,0.0000072057196,0.00013157289,0.012143627],"genre_scores_gemma":[0.9986962,0.00032362813,0.0005673796,0.00018777464,0.000035478737,0.000005459903,0.000003029491,0.000007196123,0.00017387021],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992439,0.0000045362526,0.000083540406,0.00022132369,0.00020042212,0.0002462691],"domain_scores_gemma":[0.9996553,0.0000037441928,0.000009835067,0.000112522146,0.0000020007526,0.00021658858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004882089,0.00010789513,0.0000783606,0.000021144524,0.00011091524,0.00008140009,0.00018194685,0.000018353254,0.00027766937],"category_scores_gemma":[0.0000062171357,0.00010502576,0.000011278335,0.0001220285,0.00046492685,0.00048234637,0.00013579063,0.00006432785,0.0000844222],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022294122,0.00001854808,0.0026397842,0.000058027003,0.000018739882,0.000020095436,0.002225539,0.044207487,0.9012286,0.0037054762,0.00044396357,0.04541141],"study_design_scores_gemma":[0.0004187748,0.00028781392,0.15996934,0.000018035293,0.000013938051,0.000019019375,0.0019776984,0.08851371,0.6017792,0.00010169636,0.14619425,0.0007065029],"about_ca_topic_score_codex":0.000004352224,"about_ca_topic_score_gemma":0.000005204304,"teacher_disagreement_score":0.2994494,"about_ca_system_score_codex":0.000014149384,"about_ca_system_score_gemma":0.000008333108,"threshold_uncertainty_score":0.42828262},"labels":[],"label_agreement":null},{"id":"W4251978845","doi":"10.1002/j.1551-8833.2004.tb10701.x","title":"Report from Infonetrix Indicates Rebound in Water/Wastewater Automation Markets","year":2004,"lang":"en","type":"article","venue":"American Water Works Association","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Automation; Business; Product (mathematics); Service (business); Marketing; Wastewater; Market research; Industrial organization; Engineering; Waste management","score_opus":0.002814300751718886,"score_gpt":0.1826378008910992,"score_spread":0.17982350013938034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251978845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99506116,0.000024572859,0.0015276055,0.00086080097,0.0006348007,0.00018132084,0.0000026759712,0.00046135296,0.0012457025],"genre_scores_gemma":[0.9977123,0.000049797964,0.0009464121,0.00009664375,0.00019164028,0.00006961719,0.0005878389,0.000051478462,0.0002942489],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9982124,0.00006087728,0.00052781426,0.00028467094,0.0003759699,0.0005382757],"domain_scores_gemma":[0.99946034,0.000044215565,0.00012419144,0.00027680115,0.000033339897,0.00006108984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005035019,0.00021760634,0.00028162822,0.0003124753,0.000055834756,0.00015243833,0.00015379905,0.000118963995,0.00007548844],"category_scores_gemma":[0.000040781175,0.000173064,0.000057897338,0.00032704824,0.000029122064,0.0004277537,0.00007392063,0.00021318135,0.00026634778],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040373852,0.00011982602,0.16510126,0.000029204011,0.00049352687,0.00020015214,0.0057358015,0.7957676,0.019902159,0.000017323398,0.0028098878,0.009782897],"study_design_scores_gemma":[0.0020480906,0.000056733395,0.78362274,0.00018103508,0.00009558346,0.0000081446415,0.0004501108,0.011538652,0.18398397,0.0020558957,0.014895922,0.0010631173],"about_ca_topic_score_codex":0.0016181925,"about_ca_topic_score_gemma":0.0002170251,"teacher_disagreement_score":0.7842289,"about_ca_system_score_codex":0.0015496359,"about_ca_system_score_gemma":0.0000089191935,"threshold_uncertainty_score":0.7057345},"labels":[],"label_agreement":null},{"id":"W4252379425","doi":"10.32920/ryerson.14660664","title":"Exploring Motivations for Participation in Different Modes of Urban Community Energy Development in Ontario, Canada","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Context (archaeology); Stakeholder; Sustainability; Business; Energy planning; Stakeholder engagement; Local community; Marketing; Environmental economics; Renewable energy; Environmental resource management; Public relations; Economics; Political science; Geography; Engineering","score_opus":0.1133726774763574,"score_gpt":0.22804922066746508,"score_spread":0.11467654319110768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252379425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9710613,0.000023349196,0.027444892,0.000015783487,0.00040653298,0.00017942853,0.0000030583851,0.00003799153,0.00082770333],"genre_scores_gemma":[0.9959424,0.000018018498,0.002031584,0.000010482704,0.00001604334,0.0015143171,0.0003382681,0.000025680054,0.00010316674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99887437,0.000054077802,0.00053159636,0.00015273136,0.00016262814,0.00022459407],"domain_scores_gemma":[0.9994139,0.00011124637,0.00004668619,0.00034566646,0.000043436747,0.00003906962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013055876,0.00020909435,0.00032920094,0.00020028761,0.00003085431,0.000017504773,0.0001828488,0.00006125142,0.000030201598],"category_scores_gemma":[0.000026023929,0.00022992528,0.000034801866,0.000101999314,0.0000061515293,0.000072998955,0.00030345042,0.00032284373,3.250636e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029164448,0.00008825879,0.04430441,0.00024363033,0.00006395341,8.1324595e-7,0.0020993291,0.9518202,0.000088356675,0.00069409364,0.00010855551,0.00048551048],"study_design_scores_gemma":[0.00029513123,0.000005365537,0.84698445,0.00037975848,0.000012263833,3.54106e-8,0.0010058571,0.124731675,0.02551352,0.0000592237,0.00071656023,0.0002961605],"about_ca_topic_score_codex":0.980249,"about_ca_topic_score_gemma":0.99985623,"teacher_disagreement_score":0.8270885,"about_ca_system_score_codex":0.002558237,"about_ca_system_score_gemma":0.00034336915,"threshold_uncertainty_score":0.93760806},"labels":[],"label_agreement":null},{"id":"W4253656103","doi":"10.2523/88528-ms","title":"Apache Energy - Knowledge Management System","year":2004,"lang":"en","type":"article","venue":"Proceedings of SPE Asia Pacific Oil and Gas Conference and Exhibition","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Apache (Canada)","funders":"","keywords":"Computer science","score_opus":0.00936350898016838,"score_gpt":0.1819819328505726,"score_spread":0.17261842387040421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253656103","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19181764,0.0007702648,0.0010401908,0.00037009746,0.00022472453,0.000057111145,0.000004251211,0.0003172644,0.80539846],"genre_scores_gemma":[0.9942695,0.004452597,0.0006368705,0.0000053001745,0.00007913705,0.000034734017,0.0000073991714,0.000017629693,0.00049683556],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992454,0.000001647617,0.00020294958,0.00022801706,0.00011927624,0.00020270592],"domain_scores_gemma":[0.9997435,0.0000041723843,0.000041268322,0.000057614732,0.0000720977,0.00008130315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000095267846,0.00017422742,0.00018731382,0.00014961095,0.00005979874,0.00007448036,0.00006240608,0.00006388088,0.000005360693],"category_scores_gemma":[0.0000015104937,0.00017061255,0.000027204997,0.00014447648,0.00006443645,0.00023163705,0.000050016362,0.000059659797,0.000006411315],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025863963,0.00006344623,0.00021215818,0.00318843,0.00012385526,0.0000070650353,0.0011743385,0.00023746543,0.007907715,0.7567299,0.0010626661,0.22926706],"study_design_scores_gemma":[0.016587181,0.0016446577,0.010940341,0.015928524,0.0015101949,0.0005945468,0.2127693,0.05385345,0.369608,0.1223158,0.18798438,0.006263607],"about_ca_topic_score_codex":0.000014250226,"about_ca_topic_score_gemma":0.0000041650096,"teacher_disagreement_score":0.8049016,"about_ca_system_score_codex":0.000051008312,"about_ca_system_score_gemma":0.000004096268,"threshold_uncertainty_score":0.6957378},"labels":[],"label_agreement":null},{"id":"W4254198339","doi":"10.22215/timreview925","title":"Using Entrepreneurial Marketing to Foster Reseller Adoption of Smart Micro-Grid Technology","year":2015,"lang":"en","type":"article","venue":"Technology Innovation Management Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Business; Grid; Smart grid; Marketing; Engineering; Mathematics; Electrical engineering","score_opus":0.04371933660691164,"score_gpt":0.2804779758387261,"score_spread":0.23675863923181445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254198339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66826373,0.049515463,0.16563526,0.034119807,0.009125828,0.01068187,0.000027778731,0.009342541,0.053287722],"genre_scores_gemma":[0.5520617,0.045080807,0.38803923,0.0079309745,0.0010752268,0.002371413,0.00037901767,0.000632455,0.0024291915],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979778,0.00004945208,0.0009311149,0.00038616668,0.00028427472,0.0003712136],"domain_scores_gemma":[0.9985955,0.000014632678,0.00020508344,0.00083790376,0.0003119624,0.00003495202],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012503517,0.00026829273,0.00043978493,0.0025386335,0.00004117657,0.000014726826,0.00048081198,0.00018377189,0.000060690167],"category_scores_gemma":[0.00020159483,0.0002900994,0.0000453144,0.006514685,0.00007221625,0.00012924227,0.000523092,0.00020792442,0.00013535706],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016071333,0.00026864285,0.013122963,0.015222709,0.0012336638,0.00010013119,0.00007374314,0.04329482,0.031174686,0.09893014,0.44593242,0.35048535],"study_design_scores_gemma":[0.0010629875,0.00012460817,0.0003404131,0.004172999,0.0002706168,0.000025097159,0.00020744147,0.0016752068,0.012520007,0.001812933,0.97710454,0.0006831253],"about_ca_topic_score_codex":0.0000013120751,"about_ca_topic_score_gemma":0.0000020517255,"teacher_disagreement_score":0.53117216,"about_ca_system_score_codex":0.00020728141,"about_ca_system_score_gemma":0.0000121380735,"threshold_uncertainty_score":0.9999551},"labels":[],"label_agreement":null},{"id":"W4254271241","doi":"10.1109/mpel.2020.3033691","title":"PEDG 2021","year":2020,"lang":"en","type":"article","venue":"IEEE Power Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of New Brunswick","funders":"University of Illinois at Urbana-Champaign","keywords":"Computer science","score_opus":0.00734305992924171,"score_gpt":0.1890688134442006,"score_spread":0.1817257535149589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254271241","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23377492,0.013607341,0.17420238,0.010584003,0.00659382,0.0008508851,0.000025735038,0.003867956,0.556493],"genre_scores_gemma":[0.99668974,0.00048639765,0.00039947112,0.00079453713,0.00050092867,0.000022408696,0.000013547041,0.000090642185,0.0010023196],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988143,0.000012868855,0.0001981067,0.0002461291,0.00019834215,0.0005302559],"domain_scores_gemma":[0.99950546,0.000015991742,0.000019264007,0.0002799752,0.000027734251,0.00015158001],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000066705936,0.00021083369,0.00018496782,0.000053133783,0.000029693794,0.000038209822,0.0002508943,0.000058073365,0.00079338317],"category_scores_gemma":[0.000014349416,0.00023258374,0.00007234983,0.00034716068,0.000016078602,0.00010380742,0.000037053167,0.00027122712,0.0024350167],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027795577,0.00004618753,0.00012225455,0.00007464921,0.00026613363,0.0000717476,0.00027983045,0.33840182,0.064856105,0.0058059,0.5863048,0.0037427782],"study_design_scores_gemma":[0.00038375615,0.00012944019,0.00020883854,0.0000053346366,0.000025773625,0.000004121436,0.0000065446425,0.05783608,0.013448284,0.00015140435,0.927466,0.00033445263],"about_ca_topic_score_codex":6.446373e-7,"about_ca_topic_score_gemma":0.000009736014,"teacher_disagreement_score":0.76291484,"about_ca_system_score_codex":0.000113238035,"about_ca_system_score_gemma":0.000023997225,"threshold_uncertainty_score":0.9983417},"labels":[],"label_agreement":null},{"id":"W4254922930","doi":"10.1201/b13003-5","title":"Global Smart Grid Initiatives","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Grid; Computer science; Business; Geography; Engineering; Electrical engineering; Geodesy","score_opus":0.016605133307688796,"score_gpt":0.21678548997442915,"score_spread":0.20018035666674036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254922930","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000042808183,0.00032378992,0.0015942998,0.000039258084,0.00322949,0.00010711639,0.000054420314,0.00065382523,0.9939935],"genre_scores_gemma":[0.005323185,0.0008063446,0.0005815581,0.0001307826,0.001538246,0.000017026156,0.00010971629,0.00011654184,0.9913766],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991617,0.0000025289041,0.00018943862,0.00023226891,0.00019718074,0.00021685171],"domain_scores_gemma":[0.999184,0.000013118178,0.00004803009,0.0006535807,0.000024775369,0.0000764617],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00005028324,0.00034699353,0.00028179886,0.000064169915,0.00005963786,0.00007119065,0.00035153533,0.00020024496,0.0016029456],"category_scores_gemma":[0.000007105643,0.0003486027,0.00011988807,0.0000059453732,0.000054316268,0.00013482508,0.00015051838,0.0001385026,0.0011343887],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026915297,0.000003763289,0.00007708489,0.000093986615,0.0005026533,0.00008332898,0.000012130717,0.0076298974,6.0030527e-7,0.7174453,0.26965612,0.004492415],"study_design_scores_gemma":[0.00011516012,0.000012286244,0.001118043,0.00007062563,0.000045567678,0.00000335825,0.0000016998408,0.0006074449,0.000008899161,0.0061883833,0.9914181,0.000410409],"about_ca_topic_score_codex":0.000016694614,"about_ca_topic_score_gemma":0.00018416376,"teacher_disagreement_score":0.721762,"about_ca_system_score_codex":0.00015950913,"about_ca_system_score_gemma":0.000012635918,"threshold_uncertainty_score":0.9998966},"labels":[],"label_agreement":null},{"id":"W4255404477","doi":"10.24018/ejeng.2020.5.12.2295","title":"Optimal Sizing of a PV System in Golpayegan, Iran Using Thermal Modeling-based Load Demand","year":2020,"lang":"en","type":"article","venue":"European Journal of Engineering and Technology Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Photovoltaic system; Sizing; Automotive engineering; Grid-connected photovoltaic power system; Environmental science; Grid; Diesel fuel; Load profile; Battery (electricity); Solar irradiance; Computer science; Engineering; Maximum power point tracking; Electrical engineering; Power (physics); Meteorology; Electricity; Voltage; Inverter","score_opus":0.047680360297820926,"score_gpt":0.250592425305685,"score_spread":0.20291206500786407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255404477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91368103,0.0019734693,0.08369647,0.00013721806,0.00008102514,0.000063842075,7.245238e-7,0.000119663535,0.00024656937],"genre_scores_gemma":[0.9937497,0.000041490242,0.006055148,0.0000028792676,0.00009514116,0.0000010124488,2.0101434e-7,0.000053146734,0.0000012871359],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868685,0.00008703409,0.000461287,0.00013319301,0.00030107223,0.00033055042],"domain_scores_gemma":[0.9995029,0.00004220548,0.0000468914,0.00014837491,0.0001616948,0.00009796242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015310076,0.00013630048,0.00028129964,0.0007528926,0.00003152695,0.000022702943,0.000318739,0.00005590461,0.000001934719],"category_scores_gemma":[0.00018209474,0.00013354728,0.000036948037,0.0008448328,0.0000559639,0.00007750764,0.00011503986,0.0007360477,0.0000018980282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022684546,0.000008795567,0.00040732368,0.00027556333,0.000051577867,0.00037088213,0.00013115094,0.95854855,0.039590538,0.00009874266,0.00000883427,0.00048534657],"study_design_scores_gemma":[0.0006667312,0.00016250144,0.00019271256,0.00038716992,0.000011378424,0.000041441646,0.0002765168,0.9934065,0.0045696353,7.341416e-7,0.0001797236,0.00010499732],"about_ca_topic_score_codex":0.0000033706965,"about_ca_topic_score_gemma":4.138235e-7,"teacher_disagreement_score":0.08006868,"about_ca_system_score_codex":0.00010668852,"about_ca_system_score_gemma":0.000032759162,"threshold_uncertainty_score":0.54459},"labels":[],"label_agreement":null},{"id":"W4255666723","doi":"10.17559/tv-20160915124352","title":"An Energy Efficient Architecture for IoT Based Automated Smart Micro-Grid","year":2018,"lang":"en","type":"article","venue":"Tehnicki vjesnik - Technical Gazette","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Northwestern Polytechnic","funders":"","keywords":"Architecture; Computer science; Internet of Things; Smart grid; Embedded system; Computer architecture; Distributed computing; Energy (signal processing); Engineering; Electrical engineering; Geography; Physics","score_opus":0.0069323713204516866,"score_gpt":0.22921340441492924,"score_spread":0.22228103309447755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255666723","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11568996,0.00030129307,0.84535515,0.0017809647,0.0033550987,0.0013878732,0.00017245972,0.022789951,0.009167254],"genre_scores_gemma":[0.94697183,0.0000078248595,0.048445746,0.0020501525,0.0013629745,0.0004787401,0.0001941108,0.00027464287,0.00021398181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99714416,0.00007220667,0.0006047806,0.000748835,0.00041912595,0.001010874],"domain_scores_gemma":[0.99795836,0.00016231734,0.000082718616,0.001357071,0.000117080504,0.0003224629],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004445373,0.0005591485,0.00048655755,0.00036364055,0.00018907321,0.00008606632,0.00087293994,0.00034879692,0.00013513988],"category_scores_gemma":[0.00007655535,0.0005420648,0.00025316206,0.0006372776,0.00026008426,0.00004976303,0.00013831005,0.00032497055,0.00008996349],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010900551,0.00027169322,0.000050501374,0.000106558444,0.00010809765,0.00001920401,0.000034944136,0.61748624,0.22521774,0.0017401623,0.14977993,0.0050758976],"study_design_scores_gemma":[0.00093414093,0.00040276177,0.0015574449,0.000057102192,0.000073266565,0.000013755815,0.00000460274,0.6145888,0.069054045,0.00015515758,0.31246784,0.0006910729],"about_ca_topic_score_codex":0.00004546545,"about_ca_topic_score_gemma":0.00015008004,"teacher_disagreement_score":0.83128184,"about_ca_system_score_codex":0.00024884928,"about_ca_system_score_gemma":0.00005167817,"threshold_uncertainty_score":0.9997031},"labels":[],"label_agreement":null},{"id":"W4255829253","doi":"10.32920/ryerson.14643837.v1","title":"Conceptual Framework for Enhancing Energy Disaggregation Using Crowd and Context","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Workflow; Computer science; Context (archaeology); Automation; Energy consumption; Data science; Crowdsourcing; Energy (signal processing); Audit; Consumption (sociology); Data mining; Artificial intelligence; Database; World Wide Web; Engineering; Business","score_opus":0.023895260357764937,"score_gpt":0.24440239238746814,"score_spread":0.2205071320297032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255829253","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09871152,0.002579966,0.8952027,0.00003826305,0.0023410143,0.00017440348,0.000008316589,0.00028838107,0.0006554294],"genre_scores_gemma":[0.9414665,0.00032398815,0.05696087,0.0001724938,0.0006208444,0.00011563663,0.00009940232,0.00008245549,0.000157773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998847,0.000022023245,0.00031994533,0.0003995893,0.00014078605,0.0002706439],"domain_scores_gemma":[0.99926883,0.00018061917,0.0000635701,0.00034945604,0.00006348034,0.00007406928],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010111127,0.0002981401,0.00034843176,0.00008405254,0.00006440922,0.0001843945,0.0001250888,0.0003257741,0.00009290523],"category_scores_gemma":[0.000075215474,0.00033798767,0.000098186,0.00007048013,0.000053029333,0.00009756978,0.0003385741,0.00022874912,8.2074354e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006831455,0.000013342899,0.00008358435,0.00037188033,0.00036719147,0.000006375266,0.000981098,0.83795136,0.001267089,0.14658383,0.00053698296,0.011830441],"study_design_scores_gemma":[0.0005418102,0.000027323702,0.00016978162,0.0014003139,0.00021966164,0.0000057748207,0.0038339915,0.9217592,0.045981754,0.008182796,0.016641214,0.0012364115],"about_ca_topic_score_codex":0.00020964006,"about_ca_topic_score_gemma":0.00062321656,"teacher_disagreement_score":0.842755,"about_ca_system_score_codex":0.00017132607,"about_ca_system_score_gemma":0.000030724506,"threshold_uncertainty_score":0.9999072},"labels":[],"label_agreement":null},{"id":"W4256692735","doi":"10.1016/s1464-2859(04)00231-7","title":"Alpha Technologies, Ballard collaborating on cable TV backup power","year":2004,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Broadband; Backup; Engineering; Telecommunications; Electrical engineering; Power (physics); Power cable; Cable television; Mechanical engineering","score_opus":0.004487059858411759,"score_gpt":0.16827567744145772,"score_spread":0.16378861758304597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256692735","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08625556,0.004650827,0.008897115,0.009947245,0.0075335973,0.0013428429,0.000064148015,0.010567106,0.87074155],"genre_scores_gemma":[0.97219974,0.00058113894,0.02224545,0.00061021553,0.00019027555,0.000101089274,0.000021327547,0.00016119113,0.0038895982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99863595,0.000014643287,0.00025913375,0.00032118472,0.00026970144,0.0004993815],"domain_scores_gemma":[0.9992826,0.00003974337,0.000038423634,0.0005340657,0.000043716504,0.000061453924],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00015928282,0.0002770525,0.00021929409,0.00013872534,0.00007509896,0.00007587668,0.00034102102,0.00016462906,0.001293837],"category_scores_gemma":[0.000042773605,0.00029133316,0.000054541073,0.0003890446,0.000040213996,0.000033854143,0.000119431315,0.0002576927,0.0031556638],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073157835,0.000043808883,0.00002048655,0.00008099074,0.000043182572,0.00006994918,0.00006625773,0.72565114,0.0028973287,0.0013596162,0.26951936,0.00024057395],"study_design_scores_gemma":[0.0006185963,0.00009485561,0.00005576555,0.00006698437,0.000011488467,0.000002412192,0.0003063361,0.0005779956,0.027573146,0.00016519669,0.9701589,0.00036833156],"about_ca_topic_score_codex":0.00008203302,"about_ca_topic_score_gemma":0.0000213346,"teacher_disagreement_score":0.8859441,"about_ca_system_score_codex":0.00028864943,"about_ca_system_score_gemma":0.000020322399,"threshold_uncertainty_score":0.99995387},"labels":[],"label_agreement":null},{"id":"W42788336","doi":"","title":"Agent-based Transactions for Home Energy Services.","year":2005,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Computer security","score_opus":0.006662550187284227,"score_gpt":0.18477245511345494,"score_spread":0.1781099049261707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W42788336","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008130865,0.00007594872,0.96716905,0.0007161745,0.00068654795,0.00010156279,0.00001918746,0.0006456697,0.022455007],"genre_scores_gemma":[0.9836738,0.00002198597,0.014258159,0.00047043833,0.00027635,0.00016195467,0.000025166675,0.000042964686,0.0010691818],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947226,0.000004533736,0.00011232693,0.00011311646,0.000090399255,0.000207343],"domain_scores_gemma":[0.99971443,0.000019251296,0.0000089697505,0.00018655314,0.000014197564,0.000056589048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003730014,0.00010207378,0.00008535461,0.0000776287,0.000043776956,0.000018979561,0.00011688226,0.00003958776,0.00054191565],"category_scores_gemma":[4.4245542e-7,0.00011329471,0.00006655101,0.000096494456,0.000007330884,0.00007685103,0.0000032633843,0.000035727844,0.000039815914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000485871,0.000023568988,0.000005529629,0.000064370026,0.00004226432,8.5243767e-7,0.000033061286,0.9547034,0.0041963006,0.0012321454,0.0058546914,0.033838958],"study_design_scores_gemma":[0.00032555073,0.000009084243,0.00006638707,0.0000060680386,0.000017221282,3.1340693e-7,0.000008279533,0.51396734,0.010530699,0.00015117892,0.47481015,0.00010775982],"about_ca_topic_score_codex":0.000008377478,"about_ca_topic_score_gemma":0.00014626821,"teacher_disagreement_score":0.97554296,"about_ca_system_score_codex":0.000072793104,"about_ca_system_score_gemma":0.000005150933,"threshold_uncertainty_score":0.59335965},"labels":[],"label_agreement":null},{"id":"W4280524348","doi":"10.32006/eeep.2022.1.2234","title":"ALTERNATIVE APPROACH TO SMALL SCALE PHOTOVOLTAIC SOLAR POWER AND ENERGY STORAGE","year":2022,"lang":"en","type":"article","venue":"Ecological Engineering and Environment Protection","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Mains electricity; Electricity; Energy storage; Energy supply; Electrical engineering; Automotive engineering; Engineering; Computer science; Power (physics); Economics; Voltage; Energy (signal processing)","score_opus":0.007469433993765168,"score_gpt":0.1418601876463189,"score_spread":0.13439075365255373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280524348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6448419,0.00012654762,0.3533192,0.000032012733,0.00029571768,0.00023159348,0.0000040244167,0.00026585977,0.00088315277],"genre_scores_gemma":[0.99628544,0.000080294165,0.0023123675,0.00005200212,0.000051385658,0.00095317286,0.000005309069,0.000028770986,0.00023123964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920577,0.000025418422,0.0001242133,0.00028838764,0.00012690159,0.00022928532],"domain_scores_gemma":[0.9997539,0.000012152144,0.000014509309,0.000115806615,0.0000016947117,0.00010195843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015558656,0.00016713658,0.00013514962,0.0001024616,0.00013610022,0.000024915755,0.00007212875,0.00004701489,0.00007825783],"category_scores_gemma":[0.000006353664,0.00017339083,0.000025114436,0.00008745017,0.00001555245,0.000048145088,0.00021657157,0.0002027601,0.000003944914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006924826,0.000051798055,0.000029868035,0.000015610562,0.000026040816,0.0000034416823,0.00009796429,0.9883157,0.009645143,0.000105201274,0.000044971803,0.0016573188],"study_design_scores_gemma":[0.000275561,0.0003340228,0.011383276,0.0000034441778,0.000012118347,0.000019031248,0.00007387049,0.9211195,0.0014665383,0.00005855589,0.064937554,0.00031652788],"about_ca_topic_score_codex":0.000029241946,"about_ca_topic_score_gemma":0.0000011154297,"teacher_disagreement_score":0.35144356,"about_ca_system_score_codex":0.00022231723,"about_ca_system_score_gemma":0.0000010042246,"threshold_uncertainty_score":0.7070673},"labels":[],"label_agreement":null},{"id":"W4280642238","doi":"10.3389/fenrg.2022.861571","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Computer science; Energy management; Grid; Scheduling (production processes); Load management; Demand side; Distributed computing; Load balancing (electrical power); Electricity; Engineering; Energy (signal processing); Operations management; Environmental economics; Electrical engineering","score_opus":0.019871017925453295,"score_gpt":0.2541826947727595,"score_spread":0.23431167684730622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280642238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5745071,0.016118405,0.34027404,0.00012603901,0.0053235902,0.00038523693,0.000029343024,0.0002717245,0.06296449],"genre_scores_gemma":[0.97709495,0.0012900002,0.020627132,0.000012018959,0.00007284384,0.00022332375,0.000012988799,0.00006635488,0.0006004167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99661326,0.00024460853,0.00060800835,0.00040699317,0.0013600859,0.00076706434],"domain_scores_gemma":[0.9990729,0.00008266035,0.000065069464,0.0005752603,0.00010414707,0.00009996078],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00165288,0.00021419488,0.00041737012,0.0010146091,0.00015333587,0.000019321084,0.00068951386,0.000063427164,0.000079660356],"category_scores_gemma":[0.00003094185,0.0002597713,0.00010036264,0.0014734517,0.00020142295,0.00010096974,0.0009220291,0.00036191993,9.287378e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007906767,0.00010646296,0.0012437705,0.00021084897,0.00021095132,0.00011899464,0.00014543414,0.9815368,0.00069561915,0.007119028,0.004190171,0.0043428307],"study_design_scores_gemma":[0.001433649,0.00024331296,0.00073513243,0.00016765507,0.000031076594,0.000008854718,0.0047798264,0.899724,0.029589845,0.000728417,0.062098365,0.00045988485],"about_ca_topic_score_codex":0.00068271655,"about_ca_topic_score_gemma":0.00006243265,"teacher_disagreement_score":0.4025878,"about_ca_system_score_codex":0.0008390193,"about_ca_system_score_gemma":0.0000750458,"threshold_uncertainty_score":0.99998546},"labels":[],"label_agreement":null},{"id":"W4281392643","doi":"10.1109/iciset54810.2022.9775844","title":"Prospects of Smart Metering System in Bangladesh: Cost Benefit Analysis","year":2022,"lang":"en","type":"article","venue":"2022 International Conference on Innovations in Science, Engineering and Technology (ICISET)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Installation; Metering mode; Smart meter; Metre; Cost analysis; Cost–benefit analysis; Smart grid; Electricity; Total cost; Computer science; Engineering; Telecommunications; Reliability engineering; Business; Electrical engineering; Operating system","score_opus":0.013512352323247453,"score_gpt":0.2329300733030687,"score_spread":0.21941772097982123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281392643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.989518,0.000040217852,0.0035170016,0.00024234674,0.0007274995,0.00021679165,0.00003788686,0.0002724969,0.0054277456],"genre_scores_gemma":[0.99875903,0.000016213466,0.0007854283,0.000008556221,0.000010086466,0.0003405236,0.000020379386,0.000012353724,0.000047427093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985832,0.000005732575,0.00043387993,0.00031640008,0.00040980458,0.00025100587],"domain_scores_gemma":[0.99948555,0.000027365522,0.00006495223,0.00027030634,0.0001288525,0.000022951348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054273516,0.00014257984,0.00023138557,0.0068102176,0.00008312265,0.000037745678,0.0005906049,0.000049209353,0.000063215695],"category_scores_gemma":[0.00006056839,0.00017051898,0.000024221421,0.009477727,0.00011249894,0.0001428488,0.0002893259,0.0003547423,0.0000012951846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026953323,0.000020245127,0.010111416,0.000012269091,0.00004551983,0.000007682545,0.00004619175,0.5168298,0.0042733904,0.4680732,0.000008506667,0.00056907337],"study_design_scores_gemma":[0.00027959578,0.00004650301,0.014593966,0.000050621067,0.000014431108,0.00000817133,0.0005856743,0.9804201,0.0025445258,0.00044225086,0.00082626677,0.00018790353],"about_ca_topic_score_codex":0.000026739104,"about_ca_topic_score_gemma":0.000044764518,"teacher_disagreement_score":0.46763095,"about_ca_system_score_codex":0.00056375953,"about_ca_system_score_gemma":0.00003613458,"threshold_uncertainty_score":0.69535625},"labels":[],"label_agreement":null},{"id":"W4283219995","doi":"10.1109/infocomwkshps54753.2022.9798328","title":"Dynamic Load Combined Prediction Framework with Collaborative Cloud-Edge for Microgrid","year":2022,"lang":"en","type":"article","venue":"IEEE INFOCOM 2022 - IEEE Conference on Computer Communications Workshops (INFOCOM WKSHPS)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Research and Development","keywords":"Computer science; Cloud computing; Microgrid; Enhanced Data Rates for GSM Evolution; Edge computing; Exploit; Anomaly detection; Edge device; Data mining; Scheduling (production processes); Data modeling; Process (computing); Machine learning; Distributed computing; Artificial intelligence; Real-time computing; Engineering; Database","score_opus":0.01848483767065387,"score_gpt":0.24494882454134909,"score_spread":0.22646398687069522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283219995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024102196,0.0008649095,0.9453791,0.003456381,0.010251389,0.005885367,0.0010801551,0.0027301123,0.006250436],"genre_scores_gemma":[0.911097,0.0011297037,0.07493582,0.0012532083,0.00050139514,0.00914464,0.0010598409,0.00028625302,0.00059215195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959756,0.00039576454,0.0010880227,0.0007617536,0.00089769886,0.00088117097],"domain_scores_gemma":[0.9935969,0.0011106881,0.0003612674,0.0040639755,0.000602513,0.00026464046],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.00070882414,0.00080992735,0.00077876076,0.0005493208,0.0015176517,0.00045386562,0.0035386663,0.0002450744,0.00020111678],"category_scores_gemma":[0.000025805504,0.0009219899,0.00023240421,0.002022261,0.000449992,0.0004400585,0.000824386,0.0018465163,0.000076037395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003893276,0.0005422044,0.0002143329,0.000094245275,0.00070115353,0.0000098112305,0.0021450548,0.88978726,0.00023011984,0.01769879,0.07217623,0.01601148],"study_design_scores_gemma":[0.0024535423,0.000918003,0.0004971893,0.000268034,0.00011906819,0.000017705974,0.0007804755,0.8097811,0.00017525192,0.0010995973,0.18286912,0.0010209444],"about_ca_topic_score_codex":0.000023902505,"about_ca_topic_score_gemma":0.00016361088,"teacher_disagreement_score":0.8869948,"about_ca_system_score_codex":0.0014256127,"about_ca_system_score_gemma":0.00036659723,"threshold_uncertainty_score":0.99978226},"labels":[],"label_agreement":null},{"id":"W4283326396","doi":"10.1049/enc2.12059","title":"Tuning of renewable energy bids based on energy risk management: Enhanced microgrids with pareto‐optimal profits for the utility and prosumers","year":2022,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Renewable energy; CVAR; Wind power; Expected shortfall; Portfolio optimization; Portfolio; Computer science; Microeconomics; Environmental economics; Economics; Engineering; Finance; Electrical engineering","score_opus":0.005405171520005992,"score_gpt":0.1574216751005921,"score_spread":0.1520165035805861,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283326396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5883392,0.0016491594,0.38669962,0.000332671,0.0018658268,0.0006309127,0.00020115015,0.00039263244,0.019888839],"genre_scores_gemma":[0.99586076,0.0016795641,0.0010749511,0.0002575058,0.000038325445,0.00023254691,0.000053228163,0.00004537665,0.00075774855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898314,0.000041597144,0.00024047724,0.0003628154,0.00009013346,0.0002818478],"domain_scores_gemma":[0.99935496,0.00011493048,0.0001081539,0.00032793055,0.000018522265,0.00007550187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022640041,0.00022481213,0.00023249739,0.00015400887,0.0003237169,0.000034770506,0.00018291465,0.000045538378,0.000057262278],"category_scores_gemma":[0.000002951804,0.00020134606,0.000057831596,0.00012898214,0.000090068745,0.000086115244,0.0001652049,0.00007199184,1.6948269e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033437417,0.00003053274,0.00043246415,0.00006264336,0.00020799715,0.0000016013128,0.000059792193,0.97799736,0.000078565565,0.0026814833,0.0017658809,0.016347285],"study_design_scores_gemma":[0.0012309506,0.0001979633,0.0002266816,0.0000129173695,0.00007312096,0.000001189477,0.0004619327,0.7931176,0.0078039765,0.000046275916,0.19660862,0.00021877933],"about_ca_topic_score_codex":0.00068672444,"about_ca_topic_score_gemma":0.00023336435,"teacher_disagreement_score":0.40752155,"about_ca_system_score_codex":0.00009419506,"about_ca_system_score_gemma":0.000018686802,"threshold_uncertainty_score":0.8210654},"labels":[],"label_agreement":null},{"id":"W4283361501","doi":"10.1049/enc2.12060","title":"Planning, operation, and trading mechanisms of transactive energy systems in the context of carbon neutrality","year":2022,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Asynchronous communication; Context (archaeology); Energy market; Distributed computing; Renewable energy; Environmental economics; Risk analysis (engineering); Operations research; Engineering; Business; Economics; Telecommunications","score_opus":0.009764581462822053,"score_gpt":0.1710740843548733,"score_spread":0.16130950289205126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283361501","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946369,0.0004638381,0.002990519,0.0000609931,0.000411889,0.000049465973,0.000010989862,0.000014614385,0.0013607733],"genre_scores_gemma":[0.9996033,0.00023288245,0.000011369103,0.000083016486,0.000011826992,0.000018740142,0.000007662492,0.000009214707,0.000021992935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994988,0.000054909004,0.0002052416,0.000112283065,0.000042790187,0.000085981614],"domain_scores_gemma":[0.999788,0.000044988832,0.00004450691,0.000096032716,0.0000045422034,0.000021943637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019037485,0.00008199087,0.00016798104,0.00008616399,0.000044010438,0.0000101847645,0.00008452286,0.000027585953,0.000013438971],"category_scores_gemma":[7.252363e-7,0.00008134565,0.000020683698,0.000041333606,0.00002422191,0.000057677087,0.000023322347,0.000051053554,2.1195364e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028350712,0.000013957458,0.00027932064,0.000040934374,0.00005379782,0.0000021664875,0.0025793014,0.91758275,0.0006997523,0.078168094,0.0000950898,0.00045651462],"study_design_scores_gemma":[0.0006770791,0.000078107325,0.00043566004,0.000009482647,0.00001761121,0.0000062346066,0.012322488,0.97166324,0.007508771,0.00023059745,0.0069210236,0.00012970567],"about_ca_topic_score_codex":0.0014031479,"about_ca_topic_score_gemma":0.000080547135,"teacher_disagreement_score":0.0779375,"about_ca_system_score_codex":0.00005269317,"about_ca_system_score_gemma":0.000007353721,"threshold_uncertainty_score":0.3317179},"labels":[],"label_agreement":null},{"id":"W4283755217","doi":"10.1016/j.enpol.2022.113147","title":"Developing future retail electricity markets with a customer-centric focus","year":2022,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council; Queen's University; Department for the Economy; Department for Employment and Learning, Northern Ireland","keywords":"Flexibility (engineering); Smart grid; Electricity; Renewable energy; Electricity retailing; Software deployment; Business; Energy transition; Environmental economics; Industrial organization; Grid; Electricity market; Marketing; Commerce; Telecommunications; Computer science; Engineering; Economics","score_opus":0.006295231934250671,"score_gpt":0.18893892068026732,"score_spread":0.18264368874601666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283755217","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2516828,0.0073634726,0.109598584,0.016105082,0.005342128,0.0010056655,0.00006294593,0.007086521,0.6017528],"genre_scores_gemma":[0.9934121,0.00033776351,0.0010114947,0.0007278587,0.0013314022,0.00026550738,0.000024252526,0.00010588407,0.0027837611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99841493,0.00007547742,0.00020509874,0.00028018767,0.0003984937,0.00062580727],"domain_scores_gemma":[0.9994321,0.000027088994,0.000044916826,0.0003636374,0.000024118573,0.00010817118],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013130829,0.0002612036,0.00020923016,0.0005990758,0.0002495213,0.00003530711,0.00035913565,0.00004839391,0.00025693368],"category_scores_gemma":[0.000010698243,0.00026133837,0.00005881312,0.0021858637,0.00001726273,0.00009756256,0.00019979257,0.0002458734,0.000019241657],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000852039,0.000059370363,0.00051398866,0.000051342544,0.0003758769,0.00018566842,0.00023739094,0.57109314,0.0001540749,0.29442188,0.043559372,0.0892627],"study_design_scores_gemma":[0.00051878946,0.0000404759,0.0025636232,0.0000057058473,0.000021544785,0.0000485853,0.00006148946,0.0106052505,0.0012464667,0.00026779124,0.98418874,0.00043155198],"about_ca_topic_score_codex":0.00044388312,"about_ca_topic_score_gemma":0.00010783951,"teacher_disagreement_score":0.94062936,"about_ca_system_score_codex":0.001014373,"about_ca_system_score_gemma":0.00013030272,"threshold_uncertainty_score":0.9999839},"labels":[],"label_agreement":null},{"id":"W4283808144","doi":"10.3390/su14138108","title":"Survey of Simulation Tools to Assess Techno-Economic Benefits of Smart Grid Technology in Integrated T&amp;D Systems","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Scope (computer science); Computer science; Electric power system; Systems engineering; Scalability; Risk analysis (engineering); Engineering; Power (physics); Electrical engineering; Business","score_opus":0.03221330215133293,"score_gpt":0.2685749855619043,"score_spread":0.23636168341057134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283808144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944116,0.00009810771,0.0036741463,0.00009854355,0.00051370455,0.00077329687,0.00016399725,0.00018555563,0.00008106142],"genre_scores_gemma":[0.999522,0.0000025921256,0.00007554763,0.0000024007131,0.0000103567945,0.00026083324,0.00007487006,0.000024359053,0.000027078597],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985614,0.0001417107,0.00060448184,0.0002677938,0.00015385653,0.0002707741],"domain_scores_gemma":[0.998729,0.00021563194,0.00008590844,0.00063118216,0.0003068971,0.000031408577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014478511,0.00015043894,0.000375899,0.0006717466,0.000031621115,0.000011234194,0.00033570643,0.00008597579,0.00003531949],"category_scores_gemma":[0.0008104322,0.00017845661,0.00003576395,0.0012928671,0.000045581015,0.00009558846,0.00029386845,0.00020530849,0.000001684912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029268695,0.000043527598,0.18595164,0.00018903146,0.00001866403,6.810874e-7,0.000049757084,0.8105202,0.000053104795,0.0014327895,0.00005702114,0.0016543294],"study_design_scores_gemma":[0.0004463456,0.00019428354,0.57583797,0.00003121197,0.000013240575,9.628045e-7,0.0015779872,0.41348848,0.001209516,0.00052918465,0.0063200346,0.00035075413],"about_ca_topic_score_codex":0.0061695315,"about_ca_topic_score_gemma":0.0028801518,"teacher_disagreement_score":0.3970317,"about_ca_system_score_codex":0.0025518516,"about_ca_system_score_gemma":0.00012291127,"threshold_uncertainty_score":0.9326527},"labels":[],"label_agreement":null},{"id":"W4283814659","doi":"10.1049/gtd2.12543","title":"Coordinated multi‐objective scheduling of a multi‐energy virtual power plant considering storages and demand response","year":2022,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Virtual power plant; Computer science; Scheduling (production processes); Response time; Distributed generation; Distributed computing; Renewable energy; Engineering; Electrical engineering; Operating system; Electricity; Operations management","score_opus":0.014085346816232755,"score_gpt":0.21458783719071076,"score_spread":0.200502490374478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283814659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41917008,0.0005223531,0.579487,0.00007289804,0.00027071347,0.00011683424,0.00022466143,0.00012799095,0.000007434037],"genre_scores_gemma":[0.99716413,0.000102320024,0.0016896507,0.000025549916,0.000030623738,0.00008426684,0.0008108559,0.000030140056,0.000062466104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986136,0.0002610128,0.00037297865,0.00029139384,0.00024412296,0.00021692188],"domain_scores_gemma":[0.99952877,0.00007025339,0.000073025236,0.00015789719,0.000070057984,0.000100019526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047243215,0.00020673795,0.00021558025,0.00013371385,0.00032415954,0.00003400809,0.000081461556,0.00007592787,0.00008804729],"category_scores_gemma":[0.00004120694,0.0002279171,0.000057980375,0.00026027072,0.000043591655,0.0001488943,0.00004651672,0.00016189055,7.6605335e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021594318,0.00006635024,0.00007186771,0.000015893444,0.000055976554,0.000010698486,0.0003675731,0.7114665,0.2854917,0.00041252773,0.0006138109,0.0012111708],"study_design_scores_gemma":[0.001441604,0.00014958507,0.0016298068,0.000025566786,0.000034106306,0.000015190847,0.0004457446,0.84177697,0.14456233,0.0000068731533,0.009662669,0.00024957574],"about_ca_topic_score_codex":0.0000319446,"about_ca_topic_score_gemma":0.000011594537,"teacher_disagreement_score":0.57799405,"about_ca_system_score_codex":0.00021488756,"about_ca_system_score_gemma":0.000038527975,"threshold_uncertainty_score":0.929419},"labels":[],"label_agreement":null},{"id":"W4285032518","doi":"10.22215/etd/2022-15028","title":"Non-Intrusive Load Monitoring Based User-Centric Demand Response for Smart Home Energy Management","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Demand response; Incentive; Demand side; Energy consumption; Consumption (sociology); Home automation; Smart grid; Energy management; Load management; Energy (signal processing); Environmental economics; Power demand; Electricity; Power (physics); Computer science; Power consumption; Engineering; Telecommunications; Economics; Microeconomics; Electrical engineering","score_opus":0.005532544224325986,"score_gpt":0.2181922271553597,"score_spread":0.21265968293103374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285032518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49289486,0.005486536,0.24231073,0.00028899987,0.084630184,0.007591554,0.00028100653,0.006026509,0.16048963],"genre_scores_gemma":[0.6661537,0.0017530808,0.01147588,0.000272831,0.0016930116,0.010835173,0.004207804,0.0012059796,0.30240253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972713,0.000057841287,0.00055919966,0.0006680101,0.0007450739,0.0006985994],"domain_scores_gemma":[0.9986941,0.00020758965,0.00012002781,0.000722248,0.000108135115,0.0001479064],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047139384,0.0006429071,0.0005087561,0.00084661774,0.00022637192,0.00011889306,0.00055686804,0.00021233103,0.0005510512],"category_scores_gemma":[0.000023545725,0.00075007236,0.0002854049,0.0005934995,0.0000094006755,0.00012070849,0.00010240857,0.00023850717,0.000034659366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023556196,0.0001358249,0.00034240037,0.0019213025,0.0013865292,0.000205276,0.00026347188,0.9336518,0.0005624151,0.0017922976,0.051808327,0.005574748],"study_design_scores_gemma":[0.0038361948,0.0002423072,0.016533816,0.00031839113,0.0007517849,0.000001933017,0.001658866,0.10597669,0.016168933,0.000116015995,0.85224015,0.0021549386],"about_ca_topic_score_codex":0.000092164024,"about_ca_topic_score_gemma":0.000107401764,"teacher_disagreement_score":0.8276751,"about_ca_system_score_codex":0.0013820629,"about_ca_system_score_gemma":0.000078229314,"threshold_uncertainty_score":0.999495},"labels":[],"label_agreement":null},{"id":"W4285105364","doi":"10.1109/access.2022.3175839","title":"A Discount-Based Time-of-Use Electricity Pricing Strategy for Demand Response With Minimum Information Using Reinforcement Learning","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"News aggregator; Computer science; Reinforcement learning; Demand response; Incentive; Operations research; Convergence (economics); Process (computing); Load management; Mathematical optimization; Electricity; Machine learning; Microeconomics; Economics","score_opus":0.0224057756084429,"score_gpt":0.2524391363746603,"score_spread":0.23003336076621742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285105364","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5933849,0.000008583105,0.40604445,0.0000063347893,0.00009115818,0.00029299667,0.0000035432888,0.00008535353,0.000082672086],"genre_scores_gemma":[0.99902177,0.0000015168454,0.00062833383,0.00006639597,0.000028982282,0.00013712303,0.00003181005,0.000028264065,0.000055815173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989361,0.000060134727,0.00031534492,0.00011547751,0.00030538635,0.0002675633],"domain_scores_gemma":[0.9994094,0.0001743569,0.00013971448,0.00018246716,0.00006069337,0.000033367778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000470829,0.00014897736,0.00016641665,0.00030488992,0.00019843456,0.00013289029,0.00022356154,0.00002521794,0.000027621172],"category_scores_gemma":[0.00003831666,0.00014969816,0.00003949035,0.0004633914,0.0000144912165,0.0010241353,0.000051884603,0.00013706427,0.000001268192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090986444,0.000011191458,0.0006736227,0.00010736154,0.000054717813,0.00000194578,0.00017277642,0.99343085,0.0041960594,0.000015588628,0.00022778857,0.00019822504],"study_design_scores_gemma":[0.0007982804,0.00025838596,0.0010365307,0.000026476233,0.00004406095,0.0000018138692,0.00008266791,0.97917277,0.016501153,0.000004064874,0.0018810154,0.00019276165],"about_ca_topic_score_codex":0.00006817828,"about_ca_topic_score_gemma":0.0000046135738,"teacher_disagreement_score":0.40563685,"about_ca_system_score_codex":0.00029289114,"about_ca_system_score_gemma":0.000067399356,"threshold_uncertainty_score":0.6104514},"labels":[],"label_agreement":null},{"id":"W4285127323","doi":"10.1016/b978-0-323-85527-3.00015-7","title":"Dancing with renewables: a holistic perspective encompassing the role of the demand side","year":2022,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Flexibility (engineering); Variable renewable energy; Renewable energy; Demand side; Electrification; Context (archaeology); Demand response; Risk analysis (engineering); Environmental economics; Computer science; Electric power system; Electricity; Engineering; Business; Economics; Power (physics); Electrical engineering","score_opus":0.00865856412231344,"score_gpt":0.1914557297336041,"score_spread":0.18279716561129067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285127323","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002051862,0.0029721023,0.00009707886,0.000044125394,0.00043473946,0.00042408082,0.000013685465,0.00010873512,0.99570024],"genre_scores_gemma":[0.23158064,0.00012909081,0.00043341392,0.00016124659,0.0006684087,0.00023218938,0.000007808094,0.00036189076,0.7664253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986123,0.000039972245,0.000307484,0.0003014947,0.00047031403,0.00026847885],"domain_scores_gemma":[0.99877596,0.000108711814,0.00016574665,0.0008496786,0.000057200967,0.0000427027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021392312,0.0003778215,0.0003905698,0.00010351865,0.0002497642,0.000042138414,0.00055340334,0.00007765144,0.000100495534],"category_scores_gemma":[0.000013841468,0.00023529692,0.00016799655,0.000039954168,0.00017390573,0.00003559153,0.0002932496,0.000446055,0.0000035477012],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004053063,0.000014828459,0.00006280936,0.00037279158,0.0018548882,0.000046311176,0.0076289275,0.5836349,0.00038119158,0.17120728,0.00057505036,0.23418047],"study_design_scores_gemma":[0.00018504413,0.000031239582,0.00005733168,0.0005288743,0.00036416014,0.000018856974,0.00091655273,0.001965457,0.00035032662,0.0154840425,0.97971666,0.00038146498],"about_ca_topic_score_codex":0.000018892466,"about_ca_topic_score_gemma":0.00040410404,"teacher_disagreement_score":0.9791416,"about_ca_system_score_codex":0.00048226665,"about_ca_system_score_gemma":0.00007363246,"threshold_uncertainty_score":0.95951295},"labels":[],"label_agreement":null},{"id":"W4285238437","doi":"10.1109/ojia.2022.3178235","title":"A Recommender System for Predictive Control of Heating Systems in Economic Demand Response Programs","year":2022,"lang":"en","type":"article","venue":"IEEE Open Journal of Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Flexibility (engineering); Leverage (statistics); Recommender system; Computer science; Demand response; Model predictive control; Context (archaeology); Control (management); Industrial engineering; Artificial intelligence; Machine learning; Engineering","score_opus":0.024742148204368052,"score_gpt":0.2627125101559998,"score_spread":0.23797036195163174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285238437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56946117,0.0005470106,0.41808522,0.00065730215,0.0017580827,0.006741394,0.00036071776,0.0000806566,0.0023084562],"genre_scores_gemma":[0.9961677,0.0000026442312,0.0005836881,0.000010475611,0.00015490255,0.003007421,0.000004618836,0.000025642252,0.00004285902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987538,0.00015384835,0.0007143262,0.00011074164,0.00011110937,0.00015619236],"domain_scores_gemma":[0.9991282,0.00020855741,0.000334816,0.00020414995,0.00006081404,0.00006344957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017751537,0.00009899778,0.0002971627,0.00016924829,0.00009945843,0.00005132259,0.00050293276,0.00007127807,0.0000099124245],"category_scores_gemma":[0.000010476301,0.00010703647,0.00005474755,0.00017819183,0.000015244967,0.00015444431,0.000054258257,0.00038541062,7.157318e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026722392,0.00005488754,0.00079396216,0.000075028955,0.00013150224,0.0000023320613,0.00012164374,0.9958822,0.00043615178,0.0003814616,0.0012607718,0.0005928135],"study_design_scores_gemma":[0.0067617767,0.0008358169,0.0015984306,0.00048631852,0.00019534971,0.00027833853,0.015711883,0.9168656,0.0013905433,0.0001164178,0.055352032,0.00040748806],"about_ca_topic_score_codex":0.000050027746,"about_ca_topic_score_gemma":0.0000042798274,"teacher_disagreement_score":0.4267066,"about_ca_system_score_codex":0.0007075013,"about_ca_system_score_gemma":0.000100296485,"threshold_uncertainty_score":0.43648204},"labels":[],"label_agreement":null},{"id":"W4285261781","doi":"10.1007/978-981-19-1065-4_14","title":"Valuing Demand Response on Electric Vehicles Charging","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Environmental economics; Renewable energy; Demand response; Incentive; Volatility (finance); Electricity pricing; Valuation (finance); Electricity generation; Mains electricity; Business; Economics; Microeconomics; Power (physics); Electrical engineering; Engineering; Finance; Voltage","score_opus":0.007422571657140985,"score_gpt":0.18398050203656752,"score_spread":0.17655793037942652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285261781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026107356,0.03866554,0.47912967,0.00093892764,0.013324322,0.0031279693,0.000100447745,0.010475878,0.42812988],"genre_scores_gemma":[0.9941397,0.0008758932,0.00066875905,0.00017618263,0.00086060545,0.00014171655,0.000048150385,0.0007183765,0.0023706201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99764496,0.000031241783,0.00048524138,0.0005844485,0.00054383784,0.0007102765],"domain_scores_gemma":[0.99833477,0.0008516889,0.00006573032,0.0006301961,0.000017325185,0.00010030155],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057920004,0.0007833205,0.00060044875,0.0014583216,0.000084700245,0.00006130574,0.0004203305,0.00035966662,0.0005445956],"category_scores_gemma":[0.00021285914,0.00094102806,0.00018967577,0.0003000615,0.000012137337,0.000091110116,0.00015210561,0.0017291929,0.00004533508],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005163061,0.0000065244267,0.000009276073,0.00019875357,0.0001320834,0.00019391159,0.00013341695,0.98990065,0.003707012,0.00289886,0.0001600595,0.0026078052],"study_design_scores_gemma":[0.00067652046,0.00016564288,0.00035960597,0.0009551735,0.000100634374,0.00003707857,0.000001742078,0.7094404,0.0052262894,0.0014802481,0.2795834,0.0019732383],"about_ca_topic_score_codex":0.0000064716296,"about_ca_topic_score_gemma":0.000038538536,"teacher_disagreement_score":0.96803236,"about_ca_system_score_codex":0.0011438379,"about_ca_system_score_gemma":0.000027160819,"threshold_uncertainty_score":0.99930406},"labels":[],"label_agreement":null},{"id":"W4285288380","doi":"10.1109/icjece.2022.3151158","title":"A Parallel Bidirectional Long Short-Term Memory Model for Energy Disaggregation","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and Technology","keywords":"Computer science; Autoencoder; Benchmark (surveying); Convolutional neural network; Residual; Deep learning; Feature (linguistics); Convolution (computer science); Artificial intelligence; Hidden Markov model; Energy consumption; Energy (signal processing); Set (abstract data type); Recurrent neural network; Artificial neural network; Pattern recognition (psychology); Machine learning; Algorithm; Engineering","score_opus":0.00825316989159037,"score_gpt":0.16742976867961984,"score_spread":0.15917659878802948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285288380","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057574492,0.0011562792,0.9404259,0.00005076165,0.0006734332,0.00004463721,0.000004137106,0.000033909626,0.000036451693],"genre_scores_gemma":[0.9954037,0.000029978994,0.0039682663,0.000056193443,0.00042174183,0.000025038864,0.0000065021145,0.000026809792,0.0000617714],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993342,0.0000073443475,0.00020383803,0.00008998234,0.000113239075,0.0002514072],"domain_scores_gemma":[0.9996009,0.000042294854,0.000020923555,0.000056395056,0.00002943173,0.00025008008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008836226,0.00010995452,0.00014174813,0.00031995165,0.0001001692,0.000037783713,0.00012127339,0.000024950365,0.000008385861],"category_scores_gemma":[0.00000556377,0.00012243669,0.00006918552,0.00017513186,0.000006526514,0.00008752789,0.000015826416,0.000154471,8.962675e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004059405,0.000004602562,0.00021781225,0.000011709118,0.00006131033,0.000025706046,0.00004225645,0.98436016,0.000047283833,0.0012171769,0.0015730811,0.012434814],"study_design_scores_gemma":[0.0001850008,0.00007129512,0.0015799506,0.000009021771,0.00001703913,0.00012880805,0.0000013933245,0.9946037,0.000042884138,0.00009660447,0.0031278124,0.000136476],"about_ca_topic_score_codex":0.00004115009,"about_ca_topic_score_gemma":0.00017089111,"teacher_disagreement_score":0.9378292,"about_ca_system_score_codex":0.00024239412,"about_ca_system_score_gemma":0.00007027863,"threshold_uncertainty_score":0.4992823},"labels":[],"label_agreement":null},{"id":"W4285308691","doi":"10.2139/ssrn.4118206","title":"Multi-Agent Reinforcement Mechanism Design for Dynamic Pricing-Based Demand Response in a Smart Charging Network","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Mechanism (biology); Dynamic pricing; Mechanism design; Reinforcement; Reinforcement learning; Demand response; Computer science; Microeconomics; Economics; Engineering; Artificial intelligence; Structural engineering; Electrical engineering","score_opus":0.010641016813104706,"score_gpt":0.21689124900265264,"score_spread":0.20625023218954794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285308691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054374084,0.0010659782,0.94278336,0.00022725381,0.0007456855,0.00065894984,0.0000016950478,0.0001263693,0.000016659282],"genre_scores_gemma":[0.992798,0.00030068753,0.0056860326,0.00015976273,0.00010131242,0.00043596537,0.0000116192305,0.000090503,0.00041617567],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962258,0.0002642445,0.00046300175,0.00023917785,0.0003383407,0.0024694898],"domain_scores_gemma":[0.99940586,0.00015469466,0.00010617248,0.00022987575,0.00002441687,0.000079006655],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.006575337,0.00025020065,0.00024348217,0.00036001438,0.0003911828,0.00004396715,0.00034112378,0.000043812437,0.0000373787],"category_scores_gemma":[0.000042418273,0.0002800123,0.00012470425,0.00037725206,0.000009233011,0.0000889378,0.00008104277,0.0011308859,0.000004658179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006430968,0.00003483966,0.00003961914,0.00001598544,0.00013863554,0.000015465614,0.00011817042,0.9938079,0.0011016473,0.0035361939,0.00014333474,0.00040512613],"study_design_scores_gemma":[0.0023992113,0.00064238865,0.00017768804,0.000029968855,0.000039254686,0.000048425543,0.00036376913,0.98857003,0.00021695335,0.0047821295,0.0024292883,0.00030086597],"about_ca_topic_score_codex":0.000011047496,"about_ca_topic_score_gemma":0.00016566763,"teacher_disagreement_score":0.9384239,"about_ca_system_score_codex":0.0057474193,"about_ca_system_score_gemma":0.00055963657,"threshold_uncertainty_score":0.9999652},"labels":[],"label_agreement":null},{"id":"W4286744516","doi":"10.2139/ssrn.4170050","title":"Pricing Strategy for Household Energy-Saving Option (Heso): A Novel Option-Based Intervention for Promoting Household Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Energy (signal processing); Intervention (counseling); Economics; Business; Environmental economics; Microeconomics; Public economics; Medicine","score_opus":0.016594247317318032,"score_gpt":0.21708673868845277,"score_spread":0.20049249137113473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286744516","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09145495,0.0010393384,0.90584546,0.00006947788,0.00080741366,0.0003184009,0.00002117891,0.00036060368,0.00008318751],"genre_scores_gemma":[0.99655896,0.00022179288,0.0014422756,0.00005799409,0.0005958825,0.00061419094,0.00008286465,0.00017483422,0.0002512135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99634093,0.00006465907,0.0006655848,0.00038964985,0.00042225746,0.0021169183],"domain_scores_gemma":[0.99920255,0.00013181727,0.00027497992,0.00024250787,0.00005662321,0.000091536145],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020435704,0.0003324079,0.00028000347,0.00046737478,0.00072669325,0.00015635925,0.00043646756,0.00008011327,0.0000076246474],"category_scores_gemma":[0.00004795872,0.00037983255,0.00036834436,0.00040913984,0.000017866681,0.00028196428,0.00007344218,0.0007542068,2.7008588e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006117561,0.00018288704,0.000020823682,0.000070903625,0.00015841537,0.0000011903498,0.00004447087,0.90282166,0.006452831,0.071291134,0.00006135451,0.018833172],"study_design_scores_gemma":[0.003115301,0.0011787376,0.00006151738,0.000085630025,0.00013031226,0.00009129276,0.0007015453,0.9749424,0.003010593,0.008848966,0.0073001604,0.0005335802],"about_ca_topic_score_codex":0.000098555174,"about_ca_topic_score_gemma":0.00029902245,"teacher_disagreement_score":0.905104,"about_ca_system_score_codex":0.0030720779,"about_ca_system_score_gemma":0.00036667273,"threshold_uncertainty_score":0.99986535},"labels":[],"label_agreement":null},{"id":"W4287558439","doi":"10.48550/arxiv.2012.01013","title":"Optimal Dynamic Pricing for Binary Demands in Smart Grids: A Fair and\\n Privacy-Preserving Strategy","year":2020,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Binary number; Markov chain; Operator (biology); Population; Smart grid; Markov process; Operations research; Distributed computing; Mathematics; Engineering","score_opus":0.05005840912993398,"score_gpt":0.18928077571534416,"score_spread":0.13922236658541018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4287558439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7230409,0.0003326544,0.27226004,0.00019759644,0.0007826392,0.001337025,0.000036844867,0.00037008885,0.001642207],"genre_scores_gemma":[0.99389315,0.0018648589,0.003025106,0.000044074186,0.00018065551,0.000022339053,0.00011657947,0.0001928624,0.0006603667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953138,0.00016477378,0.0007996454,0.0023199623,0.00016930938,0.0012324649],"domain_scores_gemma":[0.99742264,0.00031073805,0.0003076264,0.00139237,0.00011432553,0.00045232393],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005306003,0.0011029267,0.0011287984,0.00096303644,0.00026583613,0.0002040325,0.0018196692,0.00063232536,0.00008085932],"category_scores_gemma":[0.00013494656,0.0015356606,0.00039864713,0.0013002019,0.00014863312,0.00071986916,0.0051431567,0.001272946,0.000029297742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003119077,0.00010976233,0.0054630446,0.0022189294,0.0005580207,0.0007484972,0.00057028775,0.98243564,0.00039869777,0.006632283,0.00019254327,0.0003604002],"study_design_scores_gemma":[0.0023705,0.0002922313,0.01818027,0.00073446677,0.00040084773,0.0000061068927,0.0011632601,0.9716472,0.00007008095,0.0028692947,0.0009039543,0.0013618005],"about_ca_topic_score_codex":0.00039185327,"about_ca_topic_score_gemma":0.00028755175,"teacher_disagreement_score":0.27085224,"about_ca_system_score_codex":0.0011636665,"about_ca_system_score_gemma":0.00017482015,"threshold_uncertainty_score":0.99870926},"labels":[],"label_agreement":null},{"id":"W4288059691","doi":"10.1049/icp.2022.0881","title":"Euniversal's smart grid solutions for the coordinated operation &amp; planning of MV and LV networks with high EV integration","year":2022,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Flexibility (engineering); Smart grid; Grid; Computer science; Electricity; Systems engineering; Distributed computing; Engineering; Electrical engineering","score_opus":0.023114062586090237,"score_gpt":0.20503768968467706,"score_spread":0.18192362709858684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288059691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25932452,0.00029958543,0.73520285,0.0008269219,0.0008659827,0.0008928194,0.00003081302,0.00033689782,0.0022195994],"genre_scores_gemma":[0.9982705,0.000041995383,0.0011356248,0.000028808137,0.000075855656,0.00022443914,0.00006544239,0.000018367271,0.00013895221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938226,0.000006299349,0.00014115157,0.00015294016,0.000121388235,0.00019599112],"domain_scores_gemma":[0.9996667,0.000036362402,0.000053329484,0.00007172372,0.00014446421,0.00002742344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022931119,0.000118569995,0.000120327626,0.000071965005,0.00033721144,0.00007137193,0.00014415616,0.00003159681,0.00004096959],"category_scores_gemma":[0.000017515671,0.00009599186,0.000017378741,0.00020207971,0.000050851562,0.00019348609,0.00006795784,0.00016285061,4.4160447e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006898525,0.000016834974,0.0014524069,0.000045388526,0.00010763558,4.060988e-7,0.0015270412,0.95262754,0.002113798,0.029084692,0.011565036,0.0013902539],"study_design_scores_gemma":[0.0004812895,0.00015409214,0.0040449114,0.00004529387,0.000075438824,0.0000053987037,0.002871836,0.9812505,0.000483746,0.00010504859,0.010307408,0.00017503912],"about_ca_topic_score_codex":0.000077077406,"about_ca_topic_score_gemma":0.000055508717,"teacher_disagreement_score":0.738946,"about_ca_system_score_codex":0.00006806522,"about_ca_system_score_gemma":0.000018218207,"threshold_uncertainty_score":0.39144343},"labels":[],"label_agreement":null},{"id":"W4288280370","doi":"10.48550/arxiv.1907.12370","title":"Design and Field Implementation of Blockchain Based Renewable Energy\\n Trading in Residential Communities","year":2019,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blockchain; Microgrid; Smart contract; Clearing; Renewable energy; Environmental economics; Single point of failure; Peer-to-peer; Computer science; Electricity; Computer security; Demand response; Prosumer; Business; Vulnerability (computing); Smart grid; Economics; Distributed computing; Finance; Engineering","score_opus":0.04682875399287724,"score_gpt":0.1825433446431771,"score_spread":0.13571459065029984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288280370","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6519674,0.00006074215,0.3466631,0.0000128272595,0.00025073436,0.00016163875,0.0000051135958,0.00007112218,0.00080735545],"genre_scores_gemma":[0.99912506,0.00013452662,0.00048669014,0.00002164049,0.000022802387,0.000002353842,0.000021036898,0.000025204696,0.00016068987],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992187,0.0001252441,0.00020018204,0.00021168111,0.000055708035,0.00018850595],"domain_scores_gemma":[0.9992893,0.00017957581,0.00007820926,0.0003947587,0.000023106146,0.000035047324],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021955703,0.00018766869,0.00024722292,0.00043007036,0.000032352556,0.000021290429,0.00027144107,0.00014038826,0.00008372925],"category_scores_gemma":[0.000003236607,0.00025978815,0.000053069274,0.00018792952,0.000027774784,0.000046395668,0.00023287753,0.0001848922,7.282359e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026010006,0.000010818893,0.0039196066,0.00018669789,0.00006452456,0.00001855385,0.00023374136,0.99404025,0.00012425621,0.0007545225,0.0005499408,0.00007107656],"study_design_scores_gemma":[0.0006543671,0.00004059838,0.00074757345,0.00013720867,0.00005882042,2.6881958e-7,0.00094558415,0.9872326,0.008623079,0.0012544197,0.00007289672,0.00023253038],"about_ca_topic_score_codex":0.012899275,"about_ca_topic_score_gemma":0.005049475,"teacher_disagreement_score":0.34715766,"about_ca_system_score_codex":0.00014183836,"about_ca_system_score_gemma":0.000039039107,"threshold_uncertainty_score":0.99998546},"labels":[],"label_agreement":null},{"id":"W4288282611","doi":"10.48550/arxiv.1907.06299","title":"Universal Non-Intrusive Load Monitoring (UNILM) Using Filter Pipelines,\\n Probabilistic Knapsack, and Labelled Partition Maps","year":2019,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Knapsack problem; Partition (number theory); Probabilistic logic; Computer science; Energy consumption; Pipeline (software); Pipeline transport; Filter (signal processing); Aggregate (composite); Real-time computing; Energy (signal processing); Gaussian; Data mining; Artificial intelligence; Engineering; Algorithm; Statistics; Mathematics; Computer vision","score_opus":0.05120176735673651,"score_gpt":0.17666171238915057,"score_spread":0.12545994503241406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288282611","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8564796,0.0002198312,0.13283597,0.000039040206,0.0048866705,0.001427103,0.00007533109,0.0003203503,0.0037161296],"genre_scores_gemma":[0.9929967,0.0015620686,0.0010889292,0.00002012171,0.00081515743,0.0000043216482,0.00008344724,0.00019103299,0.0032382545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99537677,0.00023594683,0.00067844125,0.0021895987,0.00032488914,0.001194331],"domain_scores_gemma":[0.99659693,0.00023709328,0.00046405272,0.0016933494,0.00053696503,0.00047159972],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004900231,0.001254615,0.0011222687,0.0007147041,0.00041243204,0.00023889964,0.00091667776,0.00079643127,0.00023188774],"category_scores_gemma":[0.000088572015,0.0017157468,0.00036708405,0.0010906216,0.00031384858,0.00085103157,0.0022504772,0.0012597698,0.00033566382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022036103,0.00012031026,0.008387398,0.0012259764,0.000725452,0.00051702606,0.00053713506,0.983623,0.00081889494,0.0034272552,0.00021449017,0.00018265427],"study_design_scores_gemma":[0.0028070998,0.0001148264,0.0022193019,0.0012208804,0.0013040456,0.0000137849975,0.001300768,0.98511994,0.0005544497,0.001961821,0.0016367836,0.0017462703],"about_ca_topic_score_codex":0.00078616705,"about_ca_topic_score_gemma":0.00008189738,"teacher_disagreement_score":0.13651708,"about_ca_system_score_codex":0.0029730194,"about_ca_system_score_gemma":0.00033411907,"threshold_uncertainty_score":0.99852914},"labels":[],"label_agreement":null},{"id":"W4288391536","doi":"10.1109/tsg.2022.3194815","title":"Electricity Consumption Optimization Using Thermal and Battery Energy Storage Systems in Buildings","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Particle swarm optimization; Schedule; Energy storage; Mathematical optimization; Peaking power plant; Computer science; Robustness (evolution); Energy consumption; Load profile; Optimization problem; Reliability engineering; Electricity; Automotive engineering; Power (physics); Engineering; Electrical engineering; Renewable energy; Distributed generation; Mathematics","score_opus":0.013813346743712,"score_gpt":0.1979869916000344,"score_spread":0.1841736448563224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288391536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36603987,0.00014718207,0.63146836,0.000014440203,0.001964752,0.000107521635,0.000016333268,0.00016529378,0.000076207936],"genre_scores_gemma":[0.9989498,0.00014073715,0.00050868053,0.00006499044,0.00008837402,0.00014011856,0.000009136123,0.000047188732,0.00005097119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893385,0.00009899065,0.0002493947,0.00023979106,0.00022318438,0.0002547985],"domain_scores_gemma":[0.9996769,0.00004779661,0.00003522518,0.00017507836,0.000013571164,0.000051464063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018997848,0.00017444266,0.00017080293,0.00045122212,0.00022087335,0.00004647678,0.00009294529,0.000049659175,0.000109879715],"category_scores_gemma":[8.444381e-7,0.00021604745,0.000039729133,0.00037791484,0.000020654044,0.00019009554,0.000003546907,0.00024580938,0.0000023582497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022226825,0.000047429527,0.00019839275,0.000031803553,0.00003804356,0.000010260829,0.000061618615,0.99551266,0.003310975,0.00002788808,0.00013085382,0.0006078271],"study_design_scores_gemma":[0.000403299,0.000043004642,0.00044268355,0.000016712384,0.000029011253,0.000023445784,0.00003874116,0.99512976,0.001901153,0.0000012450648,0.0017530357,0.00021789636],"about_ca_topic_score_codex":0.0003944045,"about_ca_topic_score_gemma":0.00003343545,"teacher_disagreement_score":0.6329099,"about_ca_system_score_codex":0.00044824282,"about_ca_system_score_gemma":0.000011669558,"threshold_uncertainty_score":0.88101596},"labels":[],"label_agreement":null},{"id":"W4288562897","doi":"10.48550/arxiv.1902.08736","title":"Wavenilm: A causal neural network for power disaggregation from the\\n complex power signal","year":2019,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Power (physics); Convolutional neural network; Artificial neural network; Convergence (economics); Aggregate (composite); AC power; SIGNAL (programming language); Artificial intelligence; Machine learning","score_opus":0.049656689993903005,"score_gpt":0.17061923277842808,"score_spread":0.12096254278452508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288562897","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66117436,0.00017570736,0.32665685,0.00015914526,0.004683391,0.0011327144,0.00026207647,0.00056955824,0.0051862164],"genre_scores_gemma":[0.99765426,0.000036194408,0.00032780934,0.00015398231,0.00049473153,0.0000060154143,0.00046556984,0.00008406939,0.00077738176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847454,0.0000713717,0.00022819391,0.0006447724,0.00010569315,0.0004754407],"domain_scores_gemma":[0.99856764,0.00027071004,0.00012405403,0.00087149785,0.00006940119,0.000096684176],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014402201,0.0004153074,0.00036016072,0.0000750437,0.00012909783,0.00008828451,0.0007371279,0.00024708768,0.00034716981],"category_scores_gemma":[0.000010945234,0.0004226591,0.00028222063,0.00021938114,0.00007033807,0.00014025709,0.0005922286,0.0004407253,0.00009273056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058878253,0.00001773944,0.002747818,0.00003084456,0.00032768428,0.000024498702,0.00011166585,0.9667102,0.000021054824,0.0070069204,0.022885518,0.000057173223],"study_design_scores_gemma":[0.00064489566,0.000042625114,0.016173026,0.00007816345,0.00019718961,6.3243016e-7,0.00010112308,0.96163636,0.000014751575,0.004983173,0.015590268,0.0005377628],"about_ca_topic_score_codex":0.00018923724,"about_ca_topic_score_gemma":0.00015394443,"teacher_disagreement_score":0.3364799,"about_ca_system_score_codex":0.00027618196,"about_ca_system_score_gemma":0.00003058023,"threshold_uncertainty_score":0.9998225},"labels":[],"label_agreement":null},{"id":"W4289836703","doi":"10.1016/j.renene.2022.07.055","title":"A genetic algorithm optimization approach for smart energy management of microgrids","year":2022,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":150,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Schedule; Demand response; Reservation; Genetic algorithm; Renewable energy; Computer science; Mathematical optimization; Energy management; Minification; Greenhouse gas; Environmental economics; Electricity generation; Reliability engineering; Operations research; Electricity; Engineering; Power (physics); Energy (signal processing); Economics","score_opus":0.006304266835687067,"score_gpt":0.17309282103603882,"score_spread":0.16678855420035174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4289836703","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00012906943,0.0013100401,0.9842746,0.000008936598,0.0006325368,0.00013449881,0.00003249801,0.00023669514,0.013241094],"genre_scores_gemma":[0.04514143,0.0013364453,0.9415059,0.00012182867,0.00027376317,0.002292289,0.0006238445,0.00019772805,0.008506785],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850845,0.000042669242,0.0003812581,0.00034780047,0.00031405463,0.00040575484],"domain_scores_gemma":[0.9993447,0.000019900288,0.00007239259,0.00045313098,0.000037064125,0.0000728281],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001392778,0.00023789053,0.00026403426,0.0002448535,0.00014217233,0.000022547338,0.00036488072,0.000050218383,0.0001272182],"category_scores_gemma":[0.0000011937568,0.00028887397,0.00013043315,0.000523993,0.000023541923,0.00006069537,0.00024526264,0.000044047898,2.4793076e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011534169,0.000101228456,0.000007555433,0.00011740758,0.0002840528,0.0000061017336,0.000015244069,0.976222,0.00025639322,0.0012546016,0.0068244906,0.01489942],"study_design_scores_gemma":[0.0005535246,0.00006943565,0.000014494105,0.000007405999,0.00007084579,0.000006536275,0.00009347411,0.8675659,0.004114829,0.00011212842,0.1271332,0.00025822857],"about_ca_topic_score_codex":0.0009869317,"about_ca_topic_score_gemma":0.000013095237,"teacher_disagreement_score":0.12030871,"about_ca_system_score_codex":0.00020735021,"about_ca_system_score_gemma":0.000015003014,"threshold_uncertainty_score":0.99995637},"labels":[],"label_agreement":null},{"id":"W4289928588","doi":"10.1016/j.buildenv.2022.109461","title":"Ten questions concerning energy flexibility in buildings","year":2022,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Lawrence Berkeley National Laboratory; Office of Energy Efficiency; Building Technologies Office; Energistyrelsen; Natural Sciences and Engineering Research Council of Canada; Energiteknologisk udviklings- og demonstrationsprogram; Norges Forskningsråd; Agència de Gestió d'Ajuts Universitaris i de Recerca; Generalitat de Catalunya; U.S. Department of Energy; Office of Energy Efficiency and Renewable Energy; European Commission; Fundação para a Ciência e a Tecnologia; Innovationsfonden","keywords":"Flexibility (engineering); Renewable energy; Energy engineering; Environmental economics; Software deployment; Energy transition; Energy supply; Resilience (materials science); Distributed generation; Energy consumption; Architectural engineering; Risk analysis (engineering); Engineering; Business; Energy (signal processing); Economics; Electrical engineering","score_opus":0.010277909188226596,"score_gpt":0.19352535689621453,"score_spread":0.18324744770798793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4289928588","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9775692,0.0012939622,0.018157763,0.00022056607,0.00030620245,0.00008128634,0.000006396075,0.00021509538,0.0021495111],"genre_scores_gemma":[0.9969848,0.00036584053,0.0021534993,0.00007556113,0.000045890883,0.00013904943,0.000005965668,0.000024635034,0.00020479238],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99914813,0.00003665176,0.00017148213,0.00024801298,0.00016421358,0.00023151265],"domain_scores_gemma":[0.9997093,0.000027878192,0.000018006765,0.00018839637,9.2145365e-7,0.00005551305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024386248,0.00012330581,0.00011964591,0.000096873424,0.00014154917,0.000016894752,0.000107865715,0.000022685268,0.00017840552],"category_scores_gemma":[0.000005038957,0.00014634458,0.00002509224,0.00008883587,0.000033921046,0.00005410078,0.0002462558,0.00014278655,0.000002731489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002888386,0.00002232092,0.005375607,0.000008875444,0.000013941232,0.000008490929,0.000114066344,0.9782507,0.001831844,0.0033919993,0.00043613953,0.010543139],"study_design_scores_gemma":[0.0005840924,0.00006847804,0.029110156,0.000022225817,0.000021771142,0.000014941347,0.0003074279,0.25413856,0.0011772531,0.0014597696,0.712626,0.00046932805],"about_ca_topic_score_codex":0.00022083036,"about_ca_topic_score_gemma":0.0000074034715,"teacher_disagreement_score":0.7241121,"about_ca_system_score_codex":0.00038413503,"about_ca_system_score_gemma":0.0000029394796,"threshold_uncertainty_score":0.5967759},"labels":[],"label_agreement":null},{"id":"W4292071342","doi":"10.23919/ecc55457.2022.9838103","title":"Exact convergence to GNE using penalty methods","year":2022,"lang":"en","type":"article","venue":"2022 European Control Conference (ECC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Convergence (economics); Penalty method; Nash equilibrium; Mathematical optimization; Constraint (computer-aided design); Computer science; Function (biology); Best response; Game theory; Equilibrium point; Class (philosophy); Control theory (sociology); Mathematics; Mathematical economics; Control (management)","score_opus":0.030780909714290032,"score_gpt":0.27080365606023776,"score_spread":0.24002274634594772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292071342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.102722906,0.0005166564,0.79955536,0.00049970124,0.0049560303,0.00081499125,0.00010006589,0.0010938277,0.08974043],"genre_scores_gemma":[0.99095446,0.000029544768,0.0061613363,0.0009577045,0.00025792274,0.00007920064,0.000016908327,0.00012015873,0.0014227835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99697226,0.0009815327,0.00046670783,0.0005214614,0.00045312548,0.00060490513],"domain_scores_gemma":[0.9987446,0.00012992439,0.000079321384,0.00071782706,0.000080017686,0.00024830035],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0016111073,0.00033922528,0.00038978521,0.00023886908,0.0003017541,0.00011125642,0.00085201126,0.000022092236,0.0057918048],"category_scores_gemma":[0.0001080104,0.00039115924,0.00012333762,0.0005120676,0.0000372813,0.00015195012,0.00057446735,0.0004368382,0.00031209734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050721657,0.00003827695,0.00050074846,0.000034970795,0.0001853694,0.00017915253,0.00037325863,0.9310098,0.04445061,0.002892806,0.0077325115,0.01255172],"study_design_scores_gemma":[0.0010167973,0.00014189248,0.0043524317,0.000016741282,0.00008655018,0.0000201286,0.0003245472,0.630186,0.0007707054,0.000047954738,0.36237702,0.0006591924],"about_ca_topic_score_codex":0.00006179862,"about_ca_topic_score_gemma":0.000012013555,"teacher_disagreement_score":0.8882315,"about_ca_system_score_codex":0.0002526779,"about_ca_system_score_gemma":0.000055627104,"threshold_uncertainty_score":0.999854},"labels":[],"label_agreement":null},{"id":"W4292259914","doi":"10.3389/fenrg.2022.962361","title":"An evaluation of domestic electric water heaters for frequency control","year":2022,"lang":"en","type":"article","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"National Natural Science Foundation of China; Education Department of Hunan Province","keywords":"Automatic frequency control; Electric power system; Automotive engineering; Demand response; Electric power; Engineering; Power (physics); Control (management); Computer science; Control theory (sociology); Electrical engineering; Electricity","score_opus":0.02899259173603643,"score_gpt":0.30787260716763454,"score_spread":0.2788800154315981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292259914","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7932143,0.003067752,0.1945063,0.00024100236,0.0033183468,0.0012190478,0.000029343526,0.00018079639,0.0042230794],"genre_scores_gemma":[0.99664944,0.0000445366,0.0012237766,0.000018150573,0.00008163838,0.0017831277,0.00006607183,0.000043010878,0.000090231435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99744207,0.00050879724,0.00025398994,0.00024264038,0.0009804289,0.0005720531],"domain_scores_gemma":[0.99936926,0.000048546233,0.000013315133,0.00034845402,0.00015911701,0.000061295366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036283669,0.00010675141,0.00019500707,0.0010023378,0.000117567935,0.000017349155,0.00037483088,0.00004140528,0.00010772744],"category_scores_gemma":[0.000047635313,0.00010387405,0.000044730397,0.0006004481,0.000036732945,0.000107674896,0.00004480983,0.00019772997,8.982937e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005825376,0.0000570155,0.0013598598,0.000027218268,0.00006563386,0.000003898983,0.00013488239,0.9686784,0.01054418,0.00060594146,0.0056389817,0.0128257265],"study_design_scores_gemma":[0.0014746557,0.0002580396,0.0009405848,0.0000043054742,0.000021674663,0.0000011737967,0.00016218064,0.9810393,0.0061385864,0.0062700873,0.0035594876,0.00012994217],"about_ca_topic_score_codex":0.00026589626,"about_ca_topic_score_gemma":0.000026735805,"teacher_disagreement_score":0.20343512,"about_ca_system_score_codex":0.0008431135,"about_ca_system_score_gemma":0.00005854201,"threshold_uncertainty_score":0.42358607},"labels":[],"label_agreement":null},{"id":"W4294531397","doi":"10.26868/25222708.2017.602","title":"Predictive Setpoint Optimization of a Commercial Building Subject to a Winter Demand Penalty Affecting 12 Months of Utility Bills","year":2017,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Setpoint; Model predictive control; Electricity; Predictive power; Minification; Computer science; Time horizon; Peak demand; Environmental science; Control (management); Mathematical optimization; Econometrics; Engineering; Economics; Mathematics; Electrical engineering","score_opus":0.026869474144271908,"score_gpt":0.2777872951387119,"score_spread":0.25091782099444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294531397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58888197,0.0000074180707,0.4089284,0.000042438325,0.00020787721,0.00040816102,0.0000087487015,0.000121195444,0.0013937772],"genre_scores_gemma":[0.9832197,0.000007307181,0.016545655,0.000013144719,0.00012659247,0.00003201213,0.0000040810933,0.000040771847,0.000010773454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99834627,0.000017472823,0.0005811773,0.0003727904,0.00036341167,0.00031888956],"domain_scores_gemma":[0.99854016,0.00014544243,0.00039623934,0.00029315747,0.00051885564,0.00010612668],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006799366,0.00027012362,0.00043152773,0.00029102902,0.00022995024,0.0001613575,0.0004223864,0.00011741337,0.00004425936],"category_scores_gemma":[0.0008824318,0.00028785484,0.000097912445,0.00017601691,0.00008334617,0.0007052382,0.00024991515,0.00016297934,0.0000010592468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009729969,0.00002914423,0.048507184,0.00026291644,0.000078171295,3.779984e-7,0.0016573514,0.9404628,0.006524209,0.0004399799,0.00005987753,0.0018806469],"study_design_scores_gemma":[0.0004957516,0.00009495511,0.08316631,0.00048612498,0.000057674053,7.244336e-7,0.00017970451,0.8889994,0.02603532,0.00020119458,0.000054384513,0.00022847962],"about_ca_topic_score_codex":0.00009483782,"about_ca_topic_score_gemma":0.000017489647,"teacher_disagreement_score":0.39433765,"about_ca_system_score_codex":0.00012105019,"about_ca_system_score_gemma":0.000026201313,"threshold_uncertainty_score":0.9999574},"labels":[],"label_agreement":null},{"id":"W4294591092","doi":"10.1016/j.ijepes.2022.108550","title":"Blockchain-based sequential market-clearing platform for enabling energy trading in Interconnected Microgrids","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Market clearing; Context (archaeology); Energy market; Clearing; Modularity (biology); Blockchain; Order (exchange); Computer science; Microgrid; Resilience (materials science); Ranking (information retrieval); Distributed generation; Demand response; Distributed computing; Operations research; Risk analysis (engineering); Computer security; Economics; Business; Engineering; Microeconomics; Electricity; Renewable energy; Artificial intelligence; Control (management); Electrical engineering","score_opus":0.010843840530583475,"score_gpt":0.21698409574461103,"score_spread":0.20614025521402754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294591092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53894264,0.00582837,0.41738647,0.0005450788,0.029505018,0.00036417998,0.000052851876,0.00037686902,0.0069985595],"genre_scores_gemma":[0.9983317,0.000024908746,0.00024020179,0.00017586163,0.00083717145,0.00007945946,0.000014477509,0.000077011784,0.00021919135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973125,0.00010640162,0.0010757975,0.00024118654,0.0007904163,0.00047369528],"domain_scores_gemma":[0.9988932,0.00033607593,0.00028538308,0.00014775126,0.00021409876,0.00012346072],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00073912577,0.0002596181,0.0004095231,0.0013932791,0.00008641401,0.00012552331,0.00080529955,0.000084513136,0.00013573414],"category_scores_gemma":[0.00008294492,0.000280866,0.00028068817,0.00050927105,0.000018498815,0.00010600858,0.00009429858,0.00037811344,4.3797118e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039924553,0.00014063521,0.00015403373,0.000013725984,0.00052909454,0.0002566317,0.00009281495,0.9740093,0.009735009,0.0072077555,0.00467226,0.002789531],"study_design_scores_gemma":[0.0019325776,0.0002847001,0.00006171109,0.00008990438,0.000027974407,0.00024936258,0.00012803244,0.85957754,0.004359889,0.00019383543,0.13278285,0.00031162158],"about_ca_topic_score_codex":0.00023528327,"about_ca_topic_score_gemma":0.00003675265,"teacher_disagreement_score":0.45938912,"about_ca_system_score_codex":0.0016807561,"about_ca_system_score_gemma":0.00009231491,"threshold_uncertainty_score":0.99996436},"labels":[],"label_agreement":null},{"id":"W4294952288","doi":"10.3390/s22186733","title":"Low-Cost, Open-Source, Emoncms-Based SCADA System for a Large Grid-Connected PV System","year":2022,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"SCADA; Arduino; Dashboard; Embedded system; JSON; Open source hardware; Data logger; Operating system; Photovoltaic system; Modbus; Computer science; Open source; Computer hardware; Data acquisition; Database; Software; Real-time computing; Engineering; Electrical engineering","score_opus":0.010403424005711249,"score_gpt":0.2077582614921857,"score_spread":0.19735483748647445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294952288","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9321946,0.00019806041,0.028793596,0.0001976057,0.00957889,0.0046402575,0.00085244473,0.0052843364,0.0182602],"genre_scores_gemma":[0.99630684,0.0000010558588,0.00047648957,0.000111265384,0.00039163276,0.0011863364,0.0001962996,0.00018746032,0.0011426515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979355,0.00013242423,0.0004362289,0.0004440456,0.00037662813,0.0006751743],"domain_scores_gemma":[0.998893,0.00014050042,0.00008833104,0.0006807947,0.00005544084,0.00014192447],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00054836675,0.000320393,0.0004289173,0.00024151741,0.00041353435,0.00012404396,0.00065979577,0.0000695658,0.00007098413],"category_scores_gemma":[0.000026649575,0.00035659084,0.00015329999,0.0005385082,0.000011332099,0.00008043734,0.00030523606,0.00020517281,0.000074848955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078717196,0.000040158433,0.00010399953,0.0009495556,0.00013363581,0.000059540886,0.000114751005,0.9771298,0.00018789258,0.0022769978,0.018785007,0.00013991127],"study_design_scores_gemma":[0.0019605777,0.000048074322,0.00012917777,0.00011669298,0.00005740491,0.00001674343,0.0022653902,0.723613,0.003947627,0.0000010849757,0.2674448,0.00039943377],"about_ca_topic_score_codex":0.00010631949,"about_ca_topic_score_gemma":0.00004922989,"teacher_disagreement_score":0.25351682,"about_ca_system_score_codex":0.0009550563,"about_ca_system_score_gemma":0.000031899603,"threshold_uncertainty_score":0.9998886},"labels":[],"label_agreement":null},{"id":"W4294991992","doi":"10.21203/rs.3.rs-2032037/v1","title":"Minimization of Environmental Emission and cost of generation by using economic load dispatch","year":2022,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Particle swarm optimization; Thermal power station; Electricity generation; Minification; Economic dispatch; Context (archaeology); Work (physics); Power station; Electric power system; Electrical load; Power (physics); Coal; Computer science; Economic cost; Base load power plant; Environmental economics; Environmental science; Engineering; Waste management; Economics; Electrical engineering; Mechanical engineering; Microeconomics","score_opus":0.038812834735124035,"score_gpt":0.30728956171358723,"score_spread":0.2684767269784632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294991992","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9947369,0.001300963,0.0021781984,0.000019042609,0.0002590086,0.00052161195,0.00039009898,0.00002292719,0.0005712132],"genre_scores_gemma":[0.9967511,0.001894705,0.0003355757,9.874637e-7,0.000088121276,0.00006568704,0.00063397427,0.00003966235,0.00019016782],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987302,0.00011702169,0.00027706215,0.0002512164,0.0004472686,0.00017726948],"domain_scores_gemma":[0.99951476,0.00004098808,0.00006280858,0.00030663837,0.000018102384,0.000056710145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041742963,0.0001261715,0.00019003203,0.00017189742,0.00006186484,0.000021888965,0.00014511115,0.00009953907,0.00042512445],"category_scores_gemma":[0.000016594673,0.00014935096,0.00003930404,0.000058779744,0.000056578654,0.00005670318,0.0006779523,0.00027758963,0.0000013075862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000097737075,0.00003151649,0.0043144953,0.0005596602,0.000043093583,8.602562e-7,0.00015017409,0.9478855,0.039384246,0.000011533018,0.0036417532,0.0039673587],"study_design_scores_gemma":[0.00023618426,0.000036721638,0.0035719343,0.000104996994,0.000014594359,4.3887476e-7,0.00023917484,0.9698163,0.020201627,0.000012822816,0.005610909,0.00015429282],"about_ca_topic_score_codex":0.00019434388,"about_ca_topic_score_gemma":0.000013177896,"teacher_disagreement_score":0.02193077,"about_ca_system_score_codex":0.00096968305,"about_ca_system_score_gemma":0.000052628835,"threshold_uncertainty_score":0.60903555},"labels":[],"label_agreement":null},{"id":"W4295214488","doi":"","title":"Optimal Subhourly Electricity Resource Dispatch Under Multiple Price Signals With High Renewable Generation Resource Availability","year":2019,"lang":"en","type":"other","venue":"OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"SLAC National Accelerator Laboratory; Office of Science; U.S. Department of Energy; Pacific Institute for Climate Solutions; University of Victoria; California Energy Commission","keywords":"Electricity; Renewable energy; Environmental economics; Resource (disambiguation); Economic dispatch; Renewable resource; Computer science; Electricity generation; Business; Natural resource economics; Operations research; Economics; Electric power system; Engineering; Electrical engineering; Power (physics); Computer network","score_opus":0.009124887534679927,"score_gpt":0.1903780951543542,"score_spread":0.18125320761967426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4295214488","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06599079,0.00080776284,0.14738174,0.00014978004,0.0007298034,0.0014979884,0.00057415705,0.0011087377,0.78175926],"genre_scores_gemma":[0.9353923,0.00012908837,0.009408939,0.000086674736,0.00014182708,0.0001248323,0.0064902515,0.00020086767,0.048025217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99741507,0.000053093685,0.00081095804,0.00044763993,0.000848736,0.000424498],"domain_scores_gemma":[0.9982332,0.0001386329,0.0004983066,0.0008320706,0.00015394983,0.00014386771],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005595406,0.0004320606,0.00057395356,0.0005464478,0.000118687254,0.00013558548,0.00040534808,0.00033294814,0.00019047114],"category_scores_gemma":[0.00005847661,0.00038633108,0.00009729761,0.00074804836,0.00033219298,0.00042544212,0.00017184232,0.00019063274,0.000026639951],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083171566,0.0001668238,0.00025949551,0.0003855308,0.00019196857,9.971027e-7,0.000004004936,0.6032564,0.0010611069,0.0020486643,0.3922843,0.0002575217],"study_design_scores_gemma":[0.0010290911,0.00030364125,0.0039599324,0.00023480652,0.00015228588,0.0000066275725,0.000009296525,0.005494443,0.008965642,0.000014662621,0.9791401,0.0006894767],"about_ca_topic_score_codex":0.00033480665,"about_ca_topic_score_gemma":0.00027512223,"teacher_disagreement_score":0.8694015,"about_ca_system_score_codex":0.00015365306,"about_ca_system_score_gemma":0.00008055506,"threshold_uncertainty_score":0.99985886},"labels":[],"label_agreement":null},{"id":"W4296755542","doi":"10.55299/jostec.v3i1.55","title":"PLTS Design for Big Industry Needs","year":2021,"lang":"en","type":"article","venue":"Journal of Science Technology (JoSTec)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Renewable energy; Solar energy; Software; Grid parity; Electric power; Environmental science; Solar cell; Engineering; Grid; Solar power; Automotive engineering; Electrical engineering; Process engineering; Photovoltaics; Computer science; Power (physics)","score_opus":0.02640855556328935,"score_gpt":0.238346219623226,"score_spread":0.21193766405993664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296755542","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.804689,0.00082372245,0.18326189,0.0038756544,0.0047974573,0.00016204981,0.0000016998978,0.00032482453,0.0020637184],"genre_scores_gemma":[0.9762502,0.00007551721,0.023055295,0.000110644534,0.0002607252,0.000010832934,1.6145422e-7,0.000019802967,0.00021683727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998793,0.000009299287,0.00035426227,0.0001354718,0.00031254304,0.00039544102],"domain_scores_gemma":[0.99913394,0.00005639331,0.000112001006,0.00029169186,0.00031446526,0.0000915108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007987639,0.00012390381,0.00021403478,0.0018437826,0.00013543197,0.00004982061,0.00072202354,0.0002708101,0.000014373544],"category_scores_gemma":[0.0003745663,0.00011538206,0.000061190396,0.0035485416,0.0005403228,0.00026261987,0.00013235322,0.0005420937,0.0000074201466],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029287428,0.00011785893,0.0030445724,0.00008071116,0.0001818731,0.000381385,0.00036374285,0.52723205,0.367223,0.012059211,0.01504006,0.07424621],"study_design_scores_gemma":[0.0012738785,0.00043575658,0.0011191488,0.00017160714,0.00007558946,0.0010970562,0.004218678,0.016534472,0.8976722,0.0062870793,0.07069114,0.00042340814],"about_ca_topic_score_codex":3.5798539e-7,"about_ca_topic_score_gemma":0.0000011038004,"teacher_disagreement_score":0.53044915,"about_ca_system_score_codex":0.00018735712,"about_ca_system_score_gemma":0.00020770713,"threshold_uncertainty_score":0.4705144},"labels":[],"label_agreement":null},{"id":"W4297821057","doi":"10.1002/ese3.1264","title":"Optimal scheduling of DG and EV parking lots simultaneously with demand response based on self‐adjusted PSO and K‐means clustering","year":2022,"lang":"en","type":"article","venue":"Energy Science & Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of New Brunswick; University of New Brunswick","funders":"","keywords":"Particle swarm optimization; Cluster analysis; Distributed generation; Demand response; Smart grid; Sizing; Computer science; Scheduling (production processes); Energy storage; Electric power system; Probabilistic logic; Mathematical optimization; Reliability engineering; Algorithm; Engineering; Electricity; Renewable energy; Power (physics); Artificial intelligence; Mathematics","score_opus":0.004443404265099814,"score_gpt":0.17291120663080287,"score_spread":0.16846780236570305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297821057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81992954,0.0001973573,0.17901342,0.000026403557,0.00024152573,0.000079841055,0.0000027658484,0.00033763016,0.0001715476],"genre_scores_gemma":[0.97354686,0.00001858296,0.026244532,0.000034769946,0.000040160052,0.000037641454,0.0000017393278,0.000058204037,0.000017503562],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982043,0.00003829289,0.0002547352,0.00043882962,0.000562072,0.00050180196],"domain_scores_gemma":[0.9991805,0.00025930605,0.000048843158,0.00031340035,0.00003536953,0.00016255656],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008621614,0.00027324283,0.00023968806,0.0005892343,0.0002776774,0.00007533419,0.00028532132,0.00003460404,0.0000077164],"category_scores_gemma":[0.00007892134,0.00028803942,0.0000261849,0.0008666361,0.00010240088,0.00022667684,0.00018513357,0.00020455719,2.0383423e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010018027,0.00001503744,0.00021094963,0.000023330376,0.000021702821,0.0000553717,0.00031481838,0.9695212,0.02833588,0.0011693309,0.0000018462026,0.00023032933],"study_design_scores_gemma":[0.00052954804,0.00022478258,0.0015432306,0.00008366405,0.00002044728,0.00004185712,0.00018105992,0.9850964,0.008522721,8.094609e-7,0.0034267067,0.00032878146],"about_ca_topic_score_codex":0.000033195913,"about_ca_topic_score_gemma":0.000013151621,"teacher_disagreement_score":0.15361735,"about_ca_system_score_codex":0.00020708413,"about_ca_system_score_gemma":0.000049314414,"threshold_uncertainty_score":0.9999572},"labels":[],"label_agreement":null},{"id":"W4297888211","doi":"10.32920/ryerson.14663079.v2","title":"Integrated Planning Framework For Pumped Hydro Energy Storage (PHES) Systems","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Chubu Electric Power Company; University of Waterloo; Tennessee Valley Authority","keywords":"Pumped-storage hydroelectricity; Renewable energy; Energy storage; Variable renewable energy; Electricity; Environmental economics; Grid; Electric power system; Electricity generation; Distributed generation; Environmental science; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.023559752991153496,"score_gpt":0.24159353165564706,"score_spread":0.21803377866449358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297888211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055815913,0.0017331172,0.9500932,0.000044752836,0.015721804,0.0005968294,0.00010879723,0.0025535459,0.023566382],"genre_scores_gemma":[0.953839,0.00020411001,0.026383018,0.00022339952,0.0021390382,0.0054119136,0.0019168735,0.0005566392,0.009325979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99771744,0.000072693394,0.0005875718,0.00065802294,0.00038798197,0.00057631196],"domain_scores_gemma":[0.9984057,0.00027054086,0.000119843884,0.0010232662,0.000048976097,0.00013165476],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003292674,0.0006073014,0.0006615339,0.00038270568,0.00012407929,0.00022270063,0.00079654163,0.00046194345,0.00051946926],"category_scores_gemma":[0.00006544285,0.0006433359,0.00023673206,0.00026656952,0.0000191249,0.00006488394,0.0008419022,0.0009490853,0.0000122332585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013422078,0.000017092067,0.00002987296,0.00050636363,0.0004769213,0.000029292718,0.00013092895,0.93303657,0.000023348595,0.037660208,0.027706621,0.0003693902],"study_design_scores_gemma":[0.00014490244,0.000022703662,0.000017659364,0.00021729963,0.000062960135,0.0000016360821,0.00038017833,0.66394067,0.00009763259,0.0014274888,0.3331336,0.00055328297],"about_ca_topic_score_codex":0.000522328,"about_ca_topic_score_gemma":0.000017968172,"teacher_disagreement_score":0.94825745,"about_ca_system_score_codex":0.0007348248,"about_ca_system_score_gemma":0.000046987854,"threshold_uncertainty_score":0.9996018},"labels":[],"label_agreement":null},{"id":"W4298307398","doi":"10.48550/arxiv.1710.09924","title":"Optimal Ensemble Control of Loads in Distribution Grids with Network\\n Constraints","year":2017,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Optech (Canada)","funders":"","keywords":"Flexibility (engineering); Mathematical optimization; Computer science; Control theory (sociology); Demand response; Markov chain; Power (physics); Dual (grammatical number); Process (computing); Control (management); Engineering; Mathematics; Electricity; Electrical engineering","score_opus":0.024427130073770995,"score_gpt":0.15499914765940195,"score_spread":0.13057201758563097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298307398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4930551,0.000057613983,0.500189,0.00001034606,0.00047979289,0.00025494595,0.00007238711,0.00012426706,0.005756542],"genre_scores_gemma":[0.9992585,0.00014122365,0.00017618344,0.0000052335113,0.00010884405,0.0000022923962,0.00011248886,0.000028921346,0.0001662844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988778,0.0000438918,0.00020281402,0.00042407925,0.000076563316,0.00037480428],"domain_scores_gemma":[0.99892414,0.00004322661,0.00015271027,0.00072625384,0.00006802205,0.00008567746],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019272685,0.00029331274,0.00043487886,0.00010996984,0.000052875977,0.000030353185,0.00049779966,0.00022938644,0.00003452431],"category_scores_gemma":[0.000012554948,0.00034029115,0.0001007575,0.00015515451,0.00022935537,0.00011959667,0.0002561167,0.00041090773,0.0000112275575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008111667,0.000028146525,0.013356524,0.000116036594,0.00021098962,0.00023583726,0.0000172885,0.97574407,0.000014569733,0.009597219,0.00042635994,0.00017182044],"study_design_scores_gemma":[0.0021003631,0.00006562672,0.018494539,0.0003855107,0.00020362787,0.0000036667539,0.000045871056,0.9763335,0.0001829482,0.0008141793,0.0008300972,0.0005400512],"about_ca_topic_score_codex":0.000116786374,"about_ca_topic_score_gemma":0.00015941184,"teacher_disagreement_score":0.5062034,"about_ca_system_score_codex":0.0002817954,"about_ca_system_score_gemma":0.000058980073,"threshold_uncertainty_score":0.99990493},"labels":[],"label_agreement":null},{"id":"W4299411899","doi":"","title":"Scheduling protocol with load managementfor EV charging","year":2014,"lang":"en","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Computer science; Scheduling (production processes); Computer network; Distributed computing; Engineering","score_opus":0.007035896208029587,"score_gpt":0.19518009218814472,"score_spread":0.18814419598011514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299411899","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013869791,0.000037261052,0.7118053,0.0013378285,0.000108607266,0.006852777,0.0000017633835,0.00091630983,0.2650704],"genre_scores_gemma":[0.8624598,0.000023557299,0.11374585,0.00015081254,0.00007015649,0.015760804,0.000042229494,0.00012937246,0.007617425],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980772,0.00056308904,0.00027055558,0.00034995296,0.00037505006,0.00036414096],"domain_scores_gemma":[0.9980647,0.00022740687,0.000090853566,0.0010817781,0.00042026697,0.00011499471],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002640455,0.00022398934,0.00017804747,0.00012931737,0.0002014277,0.00021218187,0.00054891064,0.000055205805,0.00012807208],"category_scores_gemma":[0.00019434105,0.00021978567,0.000056918052,0.0003769729,0.00006792169,0.00021550739,0.00015602856,0.00017795079,0.00010225917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006119922,0.0007134709,0.007851509,0.0016264379,0.00055465905,0.000019925721,0.008446862,0.22566435,0.010006003,0.5248855,0.0062862253,0.2138839],"study_design_scores_gemma":[0.0016130616,9.501769e-7,0.0028175174,0.0010002669,0.00003609283,0.0000041954436,0.000097030046,0.55293083,0.056813672,0.00049159845,0.3836085,0.0005863151],"about_ca_topic_score_codex":0.00009336712,"about_ca_topic_score_gemma":0.00033724037,"teacher_disagreement_score":0.84859,"about_ca_system_score_codex":0.00013818238,"about_ca_system_score_gemma":0.000025255471,"threshold_uncertainty_score":0.89625996},"labels":[],"label_agreement":null},{"id":"W4299917724","doi":"10.48550/arxiv.1702.04863","title":"Load Synchronization and Sustained Oscillations Induced by Transactive\\n Control","year":2017,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Synchronism; Synchronization (alternating current); Flexibility (engineering); Computer science; Diversity (politics); Control (management); Business; Environmental economics; Microeconomics; Distributed computing; Industrial organization; Economics; Telecommunications","score_opus":0.02641489797726745,"score_gpt":0.16307979011265447,"score_spread":0.13666489213538702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299917724","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25449264,0.00024671754,0.7331697,0.00019435593,0.00106568,0.00095090276,0.00011047383,0.00029447422,0.009475079],"genre_scores_gemma":[0.995282,0.0014552602,0.000055413002,0.000028955907,0.00016625515,0.0000047290646,0.00007185589,0.00010142443,0.0028341203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972052,0.00016777475,0.00038976516,0.0013622188,0.00018911633,0.0006859298],"domain_scores_gemma":[0.99740314,0.00014865176,0.0003508243,0.0013785808,0.00037196852,0.00034682985],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034471072,0.0007603449,0.0006977448,0.00034894608,0.0007202091,0.0002797081,0.00077399175,0.0006471014,0.00019308008],"category_scores_gemma":[0.00009797938,0.0010594146,0.00021439912,0.00035867686,0.00023392244,0.00070516637,0.00032237216,0.0007420019,0.000052306274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110002045,0.000080431906,0.0013389721,0.0002913264,0.00093257497,0.00008554983,0.00030846844,0.9851917,0.00046329334,0.009773681,0.00031710084,0.0011069045],"study_design_scores_gemma":[0.0037043404,0.00009075777,0.003554276,0.00016637106,0.0009132816,0.000002171063,0.00036262203,0.9852418,0.00014440669,0.0016352586,0.0030706387,0.0011141159],"about_ca_topic_score_codex":0.00063466484,"about_ca_topic_score_gemma":0.00019757161,"teacher_disagreement_score":0.74078935,"about_ca_system_score_codex":0.0018001584,"about_ca_system_score_gemma":0.00026225665,"threshold_uncertainty_score":0.9991856},"labels":[],"label_agreement":null},{"id":"W4300785275","doi":"","title":"Increase in power demand guarantee: a bilevel approach","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Bilevel optimization; Power demand; Computer science; Power (physics); Power consumption; Algorithm; Physics","score_opus":0.010567865948259113,"score_gpt":0.19959253492366738,"score_spread":0.18902466897540826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300785275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39114502,0.0015771386,0.3223016,0.00089122157,0.0007476835,0.0007823911,0.000059147536,0.0008549827,0.28164083],"genre_scores_gemma":[0.95332,0.0005587356,0.04293209,0.000058722515,0.000047321882,0.00021613298,0.0003607239,0.00010753794,0.002398689],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99606633,0.0017810833,0.00057271833,0.00072730967,0.00038704407,0.00046553786],"domain_scores_gemma":[0.99650943,0.00036696217,0.00015762704,0.0022974052,0.00053888257,0.00012966889],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0040796525,0.00043608158,0.0004307581,0.0004272476,0.00010913182,0.00024711652,0.0012378454,0.00032770899,0.00016043047],"category_scores_gemma":[0.00048947043,0.0004885811,0.00015659751,0.0004603523,0.0001678039,0.00012200841,0.0013913073,0.0006522913,0.00008442725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016943998,0.0066643804,0.02878631,0.0052816276,0.002261029,0.00020067445,0.07064896,0.4821093,0.004930515,0.22206382,0.111736186,0.06514775],"study_design_scores_gemma":[0.0018788974,7.170561e-7,0.03161328,0.0032619238,0.00010841947,0.000019077532,0.00020786187,0.8886839,0.014215555,0.006899595,0.051186167,0.001924608],"about_ca_topic_score_codex":0.00084779836,"about_ca_topic_score_gemma":0.00087669695,"teacher_disagreement_score":0.56217504,"about_ca_system_score_codex":0.00024072303,"about_ca_system_score_gemma":0.000088206674,"threshold_uncertainty_score":0.9997566},"labels":[],"label_agreement":null},{"id":"W4300982014","doi":"10.1016/j.egyai.2022.100208","title":"Methods and applications for Artificial Intelligence, Big Data, Internet of Things, and Blockchain in smart energy management","year":2022,"lang":"en","type":"article","venue":"Energy and AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":396,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Ontario Centre of Innovation","keywords":"Big data; Computer science; Cloud computing; Blockchain; Data science; The Internet; Software deployment; World Wide Web; Computer security; Data mining; Software engineering","score_opus":0.028957884421517255,"score_gpt":0.27319123752440666,"score_spread":0.2442333531028894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300982014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024811304,0.001341787,0.9939918,0.00013380662,0.00026502466,0.00011065988,0.000016492319,0.000046984856,0.0016123492],"genre_scores_gemma":[0.9752035,0.0006337716,0.022200482,0.0003409163,0.00013281069,0.00059662777,0.00010919579,0.000032597687,0.0007500711],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992634,0.00004379485,0.00022553098,0.00025714742,0.00007165547,0.00013846863],"domain_scores_gemma":[0.9996157,0.00007450366,0.000028105556,0.0002387746,0.000006825485,0.000036038473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038354617,0.00010715145,0.00014363218,0.00019588902,0.00005855525,0.000019529456,0.00016440157,0.000026260474,0.000008166748],"category_scores_gemma":[0.000004359992,0.00011872345,0.000013045823,0.00017819829,0.00004101916,0.000043686272,0.00048812453,0.00005636291,4.796122e-8],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013686587,0.000030685693,0.00005222405,0.00006736886,0.00006906546,0.0000019027142,0.00012642913,0.039498538,0.000110956746,0.3692609,0.0006105627,0.5901577],"study_design_scores_gemma":[0.00011305594,0.000037269252,0.000085906584,0.000010534269,0.000028309702,0.0000029006603,0.0002745913,0.4949212,0.0020275319,0.01761329,0.48473108,0.00015430774],"about_ca_topic_score_codex":0.00024735203,"about_ca_topic_score_gemma":0.00022813912,"teacher_disagreement_score":0.9727224,"about_ca_system_score_codex":0.000017883363,"about_ca_system_score_gemma":0.00000325175,"threshold_uncertainty_score":0.4841402},"labels":[],"label_agreement":null},{"id":"W4302406590","doi":"10.48550/arxiv.1412.0939","title":"A concise, approximate representation of a collection of loads described\\n by polytopes","year":2014,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Polytope; Minkowski space; Minkowski addition; Computer science; Demand response; Regular polygon; Representation (politics); Class (philosophy); Mathematical optimization; Set (abstract data type); Variable (mathematics); Power (physics); Applied mathematics; Mathematics; Discrete mathematics; Electricity; Artificial intelligence","score_opus":0.038186879970983655,"score_gpt":0.16947726892765047,"score_spread":0.1312903889566668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4302406590","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69010884,0.00008073577,0.30102456,0.000008206398,0.00051976525,0.00029886523,0.000029944329,0.00019317765,0.0077359146],"genre_scores_gemma":[0.9982728,0.00029402671,0.00031345806,0.000007253572,0.00003565685,0.000002874852,0.00006317927,0.000034165972,0.0009765903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898195,0.00006833044,0.00028335734,0.00038953216,0.00009205786,0.00018475992],"domain_scores_gemma":[0.9989992,0.000052066694,0.00020985615,0.00057040155,0.00010860003,0.000059908725],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012638819,0.00022526974,0.0004097906,0.00029149585,0.000029616087,0.000011935275,0.00032355232,0.00018847201,0.00003931702],"category_scores_gemma":[0.000023661732,0.00029100594,0.00015078965,0.0005001688,0.00007974113,0.00009721211,0.00028309858,0.000186556,0.0000058297246],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047943646,0.00003986965,0.002650724,0.00042933834,0.0002374448,0.000006468748,0.00010537118,0.9854785,0.0020885358,0.0029204423,0.005895384,0.00009997816],"study_design_scores_gemma":[0.0007408551,0.00005527193,0.0012309363,0.00015351218,0.00023879984,9.799292e-7,0.00013990716,0.9601072,0.034598995,0.0016427751,0.00072923367,0.00036155005],"about_ca_topic_score_codex":0.00041865068,"about_ca_topic_score_gemma":0.00003623112,"teacher_disagreement_score":0.30816394,"about_ca_system_score_codex":0.00017654724,"about_ca_system_score_gemma":0.000025006435,"threshold_uncertainty_score":0.9999542},"labels":[],"label_agreement":null},{"id":"W4307442560","doi":"10.32920/21408582.v1","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Demand patterns; Microeconomics; Work (physics); Economics; Demand management; Market demand schedule; Demand response; On demand; Demand curve; Business; Operations research; Industrial organization; Commerce; Electricity; Engineering; International economics","score_opus":0.012476489301100417,"score_gpt":0.24494551284332158,"score_spread":0.23246902354222115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019153116,0.0014076879,0.9632337,0.0006880082,0.004734268,0.0010981136,0.00018532852,0.001043441,0.025694102],"genre_scores_gemma":[0.8498029,0.0022970005,0.12157264,0.003434143,0.0019027978,0.007950588,0.0019187488,0.0007533126,0.010367851],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986694,0.000035449295,0.00028227444,0.00032887378,0.00022877855,0.00045524727],"domain_scores_gemma":[0.99889135,0.0003195911,0.00005995218,0.0006449295,0.000024022305,0.000060141825],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00041470252,0.00030512325,0.000293061,0.000077053344,0.0001762389,0.000112134505,0.00057502073,0.00021803677,0.0009167389],"category_scores_gemma":[0.000054861262,0.0002526963,0.00017427311,0.00011490868,0.000017664539,0.00003837574,0.0006359295,0.00087316363,0.000011940556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061199853,0.000016215668,0.000020287413,0.00011577974,0.00034876043,0.0000017216897,0.00011161617,0.84878993,0.000018027378,0.01473919,0.13560231,0.00023004271],"study_design_scores_gemma":[0.00027993208,0.000008823596,0.00006195309,0.00003257665,0.000105229425,4.4817529e-7,0.00032882905,0.3093464,0.00018786395,0.001160103,0.68810266,0.00038516536],"about_ca_topic_score_codex":0.000021168047,"about_ca_topic_score_gemma":0.000008756146,"teacher_disagreement_score":0.84788764,"about_ca_system_score_codex":0.00018857118,"about_ca_system_score_gemma":0.000014093416,"threshold_uncertainty_score":0.99999654},"labels":[],"label_agreement":null},{"id":"W4307442694","doi":"10.32920/21408588","title":"Demand response procurement framework: a new four-step probabilistic method","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Market clearing; Procurement; Microeconomics; Economics; Electricity market; Supply and demand; Clearing; Demand response; Business; Electricity; Industrial organization; Finance; Marketing","score_opus":0.035914997189028124,"score_gpt":0.2822525421460688,"score_spread":0.2463375449570407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442694","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022867422,0.0005582774,0.97287846,0.000848405,0.003167197,0.0015754034,0.000012919255,0.0017024183,0.01697016],"genre_scores_gemma":[0.031599686,0.00015984023,0.9449413,0.00048100768,0.00092075474,0.0024925682,0.000070324095,0.00036976085,0.018964756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99690527,0.00036200497,0.00060655933,0.00081350387,0.0007207439,0.0005919264],"domain_scores_gemma":[0.9977111,0.00045592652,0.000096304124,0.0014537334,0.00004397398,0.00023894242],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0017342459,0.0006022745,0.0005584663,0.00032289748,0.00009309101,0.00015249754,0.00081141613,0.00032388658,0.0037576426],"category_scores_gemma":[0.00044669537,0.0006247341,0.0002250437,0.00030813593,0.000019272853,0.0000526292,0.0020560543,0.0013363799,0.000072810566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012440237,0.00003478188,0.00003531188,0.000550794,0.0003647092,0.00004591326,0.00021975563,0.94573635,0.000034589502,0.0058121923,0.044341665,0.0026995605],"study_design_scores_gemma":[0.0004969758,0.00011249375,0.0012584693,0.0002816122,0.00030723176,0.000011671174,0.00011739305,0.47596553,0.00024079462,0.026507277,0.49339837,0.0013021699],"about_ca_topic_score_codex":0.00011480087,"about_ca_topic_score_gemma":0.00004761251,"teacher_disagreement_score":0.4697708,"about_ca_system_score_codex":0.0009848974,"about_ca_system_score_gemma":0.00020416496,"threshold_uncertainty_score":0.9996204},"labels":[],"label_agreement":null},{"id":"W4307442780","doi":"10.32920/21408588.v1","title":"Demand response procurement framework: a new four-step probabilistic method","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Market clearing; Procurement; Microeconomics; Economics; Electricity market; Supply and demand; Clearing; Demand response; Industrial organization; Business; Electricity; Marketing; Finance","score_opus":0.035914997189028124,"score_gpt":0.2822525421460688,"score_spread":0.2463375449570407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307442780","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022867422,0.0005582774,0.97287846,0.000848405,0.003167197,0.0015754034,0.000012919255,0.0017024183,0.01697016],"genre_scores_gemma":[0.031599686,0.00015984023,0.9449413,0.00048100768,0.00092075474,0.0024925682,0.000070324095,0.00036976085,0.018964756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99690527,0.00036200497,0.00060655933,0.00081350387,0.0007207439,0.0005919264],"domain_scores_gemma":[0.9977111,0.00045592652,0.000096304124,0.0014537334,0.00004397398,0.00023894242],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0017342459,0.0006022745,0.0005584663,0.00032289748,0.00009309101,0.00015249754,0.00081141613,0.00032388658,0.0037576426],"category_scores_gemma":[0.00044669537,0.0006247341,0.0002250437,0.00030813593,0.000019272853,0.0000526292,0.0020560543,0.0013363799,0.000072810566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012440237,0.00003478188,0.00003531188,0.000550794,0.0003647092,0.00004591326,0.00021975563,0.94573635,0.000034589502,0.0058121923,0.044341665,0.0026995605],"study_design_scores_gemma":[0.0004969758,0.00011249375,0.0012584693,0.0002816122,0.00030723176,0.000011671174,0.00011739305,0.47596553,0.00024079462,0.026507277,0.49339837,0.0013021699],"about_ca_topic_score_codex":0.00011480087,"about_ca_topic_score_gemma":0.00004761251,"teacher_disagreement_score":0.4697708,"about_ca_system_score_codex":0.0009848974,"about_ca_system_score_gemma":0.00020416496,"threshold_uncertainty_score":0.9996204},"labels":[],"label_agreement":null},{"id":"W4307445389","doi":"10.32920/21408585","title":"Value-stack aggregator optimal planning considering disparate DERs technologies","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Value proposition; Computer science; Capacity planning; Energy planning; Environmental economics; Business model; Business; Time horizon; Renewable energy; Economics; Engineering; Finance; Marketing","score_opus":0.022342585849414932,"score_gpt":0.2422480279101956,"score_spread":0.21990544206078066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445389","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.548196,0.010403174,0.25267288,0.0010113794,0.0129512055,0.0016701054,0.00008284477,0.033348247,0.13966411],"genre_scores_gemma":[0.95592093,0.0006456568,0.040886443,0.00010259888,0.00017106105,0.0007358156,0.00009953463,0.00025678953,0.0011811504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979702,0.000029267367,0.00042586488,0.0006117168,0.00035254366,0.0006103602],"domain_scores_gemma":[0.99879193,0.000078942125,0.00009047945,0.0009530739,0.000018099865,0.000067495785],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019089262,0.00054891757,0.00047699697,0.00038889627,0.00013651147,0.00016668216,0.0007352596,0.0002711675,0.0004308255],"category_scores_gemma":[0.000054856817,0.000607491,0.0001576276,0.00021175644,0.00008065418,0.00010101876,0.002953943,0.0011255908,0.0000490803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046428454,0.0000071491068,0.00048052752,0.00024807843,0.000325742,0.00014481423,0.000121076955,0.98383194,0.00005909696,0.0016568294,0.012625161,0.00049493334],"study_design_scores_gemma":[0.00031358417,0.000026837737,0.00034169154,0.0002336479,0.000103311584,0.00001200374,0.0026099982,0.8824144,0.0036636696,0.00070688495,0.10827007,0.0013039008],"about_ca_topic_score_codex":0.00004383029,"about_ca_topic_score_gemma":0.0000049236614,"teacher_disagreement_score":0.40772492,"about_ca_system_score_codex":0.000390378,"about_ca_system_score_gemma":0.000039423452,"threshold_uncertainty_score":0.99963766},"labels":[],"label_agreement":null},{"id":"W4307445399","doi":"10.32920/21408573","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Mathematical optimization; Computer science; Prosumer; Energy storage; Grid; Investment (military); Electricity; Environmental economics; Reliability engineering; Power (physics); Engineering; Electrical engineering; Economics; Production (economics); Mathematics; Microeconomics","score_opus":0.030588440527077987,"score_gpt":0.23173078873170702,"score_spread":0.20114234820462903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445399","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06085188,0.0011785806,0.9298556,0.000011798098,0.0014277685,0.0009729233,0.00011889411,0.0011356333,0.0044469167],"genre_scores_gemma":[0.94268316,0.00005267164,0.050369788,0.00010572946,0.0002915057,0.0042452267,0.000821065,0.00032134503,0.001109492],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979158,0.000040634874,0.0004216516,0.00073581433,0.00030858457,0.0005774817],"domain_scores_gemma":[0.9989968,0.00016076633,0.000094422765,0.00054656103,0.000051489475,0.00014997202],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030691022,0.0005787756,0.0005561528,0.00040619847,0.00017377596,0.00017698065,0.00033655862,0.00020763428,0.000084189094],"category_scores_gemma":[0.000053941076,0.0006681838,0.0000910162,0.00023158733,0.000055533197,0.000098201264,0.0011737823,0.00058169983,6.5371574e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021816644,0.000018483766,0.000029549221,0.000705176,0.00042146986,0.000016629281,0.00048648688,0.99363154,0.00021730101,0.0007272259,0.0036107735,0.000113549235],"study_design_scores_gemma":[0.0005450242,0.00004748759,0.00009260043,0.00008283354,0.00013306866,0.000014553207,0.0010743252,0.98345315,0.00011864028,0.000099228695,0.013581957,0.0007571278],"about_ca_topic_score_codex":0.00016365034,"about_ca_topic_score_gemma":0.000011008258,"teacher_disagreement_score":0.8818313,"about_ca_system_score_codex":0.00031836325,"about_ca_system_score_gemma":0.00008159215,"threshold_uncertainty_score":0.9995769},"labels":[],"label_agreement":null},{"id":"W4307445416","doi":"10.32920/21408585.v1","title":"Value-stack aggregator optimal planning considering disparate DERs technologies","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"News aggregator; Distributed generation; Revenue; Value proposition; Capacity planning; Computer science; Energy planning; Business model; Environmental economics; Business; Net metering; Renewable energy; Economics; Engineering; Marketing; Finance","score_opus":0.022342585849414932,"score_gpt":0.2422480279101956,"score_spread":0.21990544206078066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445416","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.548196,0.010403174,0.25267288,0.0010113794,0.0129512055,0.0016701054,0.00008284477,0.033348247,0.13966411],"genre_scores_gemma":[0.95592093,0.0006456568,0.040886443,0.00010259888,0.00017106105,0.0007358156,0.00009953463,0.00025678953,0.0011811504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979702,0.000029267367,0.00042586488,0.0006117168,0.00035254366,0.0006103602],"domain_scores_gemma":[0.99879193,0.000078942125,0.00009047945,0.0009530739,0.000018099865,0.000067495785],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019089262,0.00054891757,0.00047699697,0.00038889627,0.00013651147,0.00016668216,0.0007352596,0.0002711675,0.0004308255],"category_scores_gemma":[0.000054856817,0.000607491,0.0001576276,0.00021175644,0.00008065418,0.00010101876,0.002953943,0.0011255908,0.0000490803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046428454,0.0000071491068,0.00048052752,0.00024807843,0.000325742,0.00014481423,0.000121076955,0.98383194,0.00005909696,0.0016568294,0.012625161,0.00049493334],"study_design_scores_gemma":[0.00031358417,0.000026837737,0.00034169154,0.0002336479,0.000103311584,0.00001200374,0.0026099982,0.8824144,0.0036636696,0.00070688495,0.10827007,0.0013039008],"about_ca_topic_score_codex":0.00004383029,"about_ca_topic_score_gemma":0.0000049236614,"teacher_disagreement_score":0.40772492,"about_ca_system_score_codex":0.000390378,"about_ca_system_score_gemma":0.000039423452,"threshold_uncertainty_score":0.99963766},"labels":[],"label_agreement":null},{"id":"W4307445480","doi":"10.32920/21408573.v1","title":"Optimal Asset Planning for Prosumers Considering Energy Storage and Photovoltaic (PV) Units: A Stochastic Approach","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Renewable energy; Net present value; Mathematical optimization; Computer science; Prosumer; Energy storage; Grid; Electricity; Investment (military); Reliability engineering; Environmental economics; Power (physics); Engineering; Electrical engineering; Mathematics; Economics; Production (economics); Microeconomics","score_opus":0.030588440527077987,"score_gpt":0.23173078873170702,"score_spread":0.20114234820462903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06085188,0.0011785806,0.9298556,0.000011798098,0.0014277685,0.0009729233,0.00011889411,0.0011356333,0.0044469167],"genre_scores_gemma":[0.94268316,0.00005267164,0.050369788,0.00010572946,0.0002915057,0.0042452267,0.000821065,0.00032134503,0.001109492],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979158,0.000040634874,0.0004216516,0.00073581433,0.00030858457,0.0005774817],"domain_scores_gemma":[0.9989968,0.00016076633,0.000094422765,0.00054656103,0.000051489475,0.00014997202],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030691022,0.0005787756,0.0005561528,0.00040619847,0.00017377596,0.00017698065,0.00033655862,0.00020763428,0.000084189094],"category_scores_gemma":[0.000053941076,0.0006681838,0.0000910162,0.00023158733,0.000055533197,0.000098201264,0.0011737823,0.00058169983,6.5371574e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021816644,0.000018483766,0.000029549221,0.000705176,0.00042146986,0.000016629281,0.00048648688,0.99363154,0.00021730101,0.0007272259,0.0036107735,0.000113549235],"study_design_scores_gemma":[0.0005450242,0.00004748759,0.00009260043,0.00008283354,0.00013306866,0.000014553207,0.0010743252,0.98345315,0.00011864028,0.000099228695,0.013581957,0.0007571278],"about_ca_topic_score_codex":0.00016365034,"about_ca_topic_score_gemma":0.000011008258,"teacher_disagreement_score":0.8818313,"about_ca_system_score_codex":0.00031836325,"about_ca_system_score_gemma":0.00008159215,"threshold_uncertainty_score":0.9995769},"labels":[],"label_agreement":null},{"id":"W4307445508","doi":"10.32920/21408591","title":"Appliance Scheduling Optimization in Smart Home Networks","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Smart grid; Scheduling (production processes); Schedule; Computer science; Electricity; Mathematical optimization; Grid; Home automation; Integer programming; Real-time computing; Engineering; Electrical engineering; Telecommunications; Algorithm; Mathematics","score_opus":0.010653606527533093,"score_gpt":0.2043330758925649,"score_spread":0.19367946936503183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307445508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041811196,0.0007246289,0.9575977,0.000052394334,0.0034829138,0.00033353298,0.000002332225,0.0008062224,0.032819156],"genre_scores_gemma":[0.8438663,0.0023709766,0.14891778,0.00021532201,0.00077667966,0.0013816843,0.0005548873,0.00026021604,0.0016561574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988251,0.00002389744,0.00031365964,0.00035704314,0.00018292936,0.00029741233],"domain_scores_gemma":[0.99940693,0.000021648651,0.000036969577,0.00048044993,0.000011299441,0.000042700318],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021773796,0.00025086087,0.00025192762,0.00021130627,0.000032570722,0.00006035853,0.00034722104,0.00015815222,0.0008203776],"category_scores_gemma":[0.0000051987063,0.000314952,0.000059898106,0.00029424386,0.0000093795925,0.000056139026,0.0007922892,0.000722726,0.000015548505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002119557,0.000009932883,0.0008543227,0.00009955597,0.00003423863,0.0000089662935,0.000019719822,0.99725276,7.3424184e-7,0.0005303786,0.00068717403,0.00050010916],"study_design_scores_gemma":[0.00013683872,0.000003026689,0.00074569363,0.000045439105,0.000009346184,3.455865e-7,0.000030547024,0.9944819,0.0000050135905,0.00008332523,0.004129066,0.00032941808],"about_ca_topic_score_codex":0.00006401214,"about_ca_topic_score_gemma":0.000046591693,"teacher_disagreement_score":0.8396852,"about_ca_system_score_codex":0.00036835662,"about_ca_system_score_gemma":0.000012507765,"threshold_uncertainty_score":0.99993026},"labels":[],"label_agreement":null},{"id":"W4307525929","doi":"10.32920/21408591.v1","title":"Appliance Scheduling Optimization in Smart Home Networks","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Smart grid; Scheduling (production processes); Computer science; Schedule; Electricity; Home automation; Mathematical optimization; Integer programming; Grid; Real-time computing; Engineering; Electrical engineering; Telecommunications; Algorithm; Mathematics","score_opus":0.010653606527533093,"score_gpt":0.2043330758925649,"score_spread":0.19367946936503183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307525929","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041811196,0.0007246289,0.9575977,0.000052394334,0.0034829138,0.00033353298,0.000002332225,0.0008062224,0.032819156],"genre_scores_gemma":[0.8438663,0.0023709766,0.14891778,0.00021532201,0.00077667966,0.0013816843,0.0005548873,0.00026021604,0.0016561574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988251,0.00002389744,0.00031365964,0.00035704314,0.00018292936,0.00029741233],"domain_scores_gemma":[0.99940693,0.000021648651,0.000036969577,0.00048044993,0.000011299441,0.000042700318],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021773796,0.00025086087,0.00025192762,0.00021130627,0.000032570722,0.00006035853,0.00034722104,0.00015815222,0.0008203776],"category_scores_gemma":[0.0000051987063,0.000314952,0.000059898106,0.00029424386,0.0000093795925,0.000056139026,0.0007922892,0.000722726,0.000015548505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002119557,0.000009932883,0.0008543227,0.00009955597,0.00003423863,0.0000089662935,0.000019719822,0.99725276,7.3424184e-7,0.0005303786,0.00068717403,0.00050010916],"study_design_scores_gemma":[0.00013683872,0.000003026689,0.00074569363,0.000045439105,0.000009346184,3.455865e-7,0.000030547024,0.9944819,0.0000050135905,0.00008332523,0.004129066,0.00032941808],"about_ca_topic_score_codex":0.00006401214,"about_ca_topic_score_gemma":0.000046591693,"teacher_disagreement_score":0.8396852,"about_ca_system_score_codex":0.00036835662,"about_ca_system_score_gemma":0.000012507765,"threshold_uncertainty_score":0.99993026},"labels":[],"label_agreement":null},{"id":"W4307526243","doi":"10.32920/21408582","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Tariff; Peak demand; Work (physics); Microeconomics; Demand patterns; Demand management; Economics; Market demand schedule; Business; Demand response; On demand; Demand curve; Industrial organization; Operations research; Commerce; Electricity; International economics; Engineering","score_opus":0.012476489301100417,"score_gpt":0.24494551284332158,"score_spread":0.23246902354222115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307526243","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019153116,0.0014076879,0.9632337,0.0006880082,0.004734268,0.0010981136,0.00018532852,0.001043441,0.025694102],"genre_scores_gemma":[0.8498029,0.0022970005,0.12157264,0.003434143,0.0019027978,0.007950588,0.0019187488,0.0007533126,0.010367851],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986694,0.000035449295,0.00028227444,0.00032887378,0.00022877855,0.00045524727],"domain_scores_gemma":[0.99889135,0.0003195911,0.00005995218,0.0006449295,0.000024022305,0.000060141825],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00041470252,0.00030512325,0.000293061,0.000077053344,0.0001762389,0.000112134505,0.00057502073,0.00021803677,0.0009167389],"category_scores_gemma":[0.000054861262,0.0002526963,0.00017427311,0.00011490868,0.000017664539,0.00003837574,0.0006359295,0.00087316363,0.000011940556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061199853,0.000016215668,0.000020287413,0.00011577974,0.00034876043,0.0000017216897,0.00011161617,0.84878993,0.000018027378,0.01473919,0.13560231,0.00023004271],"study_design_scores_gemma":[0.00027993208,0.000008823596,0.00006195309,0.00003257665,0.000105229425,4.4817529e-7,0.00032882905,0.3093464,0.00018786395,0.001160103,0.68810266,0.00038516536],"about_ca_topic_score_codex":0.000021168047,"about_ca_topic_score_gemma":0.000008756146,"teacher_disagreement_score":0.84788764,"about_ca_system_score_codex":0.00018857118,"about_ca_system_score_gemma":0.000014093416,"threshold_uncertainty_score":0.99999654},"labels":[],"label_agreement":null},{"id":"W4308087395","doi":"10.1109/isc255366.2022.9921890","title":"Optimal Regulation of Prosumers and Consumers in Smart Energy Communities","year":2022,"lang":"en","type":"article","venue":"2022 IEEE International Smart Cities Conference (ISC2)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prosumer; Probabilistic logic; Photovoltaic system; Computer science; Environmental economics; Renewable energy; Business; Mathematical optimization; Engineering; Economics; Mathematics; Electrical engineering; Artificial intelligence","score_opus":0.02018313188344867,"score_gpt":0.21640207831201902,"score_spread":0.19621894642857035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308087395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96895385,0.00016063979,0.0027594988,0.00028257348,0.002205955,0.00014779955,0.00011536775,0.000118482,0.025255816],"genre_scores_gemma":[0.9973392,0.00022716726,0.000256083,0.00008045805,0.000038380047,0.00022300676,0.00019146974,0.000028762815,0.0016154555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986569,0.00009632314,0.00039891215,0.00016948978,0.0004570375,0.00022129656],"domain_scores_gemma":[0.99948317,0.00010449063,0.000086359505,0.00021413871,0.00007033022,0.00004153042],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002452722,0.0001863576,0.00022514467,0.0004207557,0.00010696819,0.00005042693,0.00037444383,0.00004089072,0.0018281329],"category_scores_gemma":[0.000010123043,0.00023253339,0.000050216437,0.00017779965,0.00018076383,0.00023069399,0.00024823408,0.00022800206,0.000002433787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014060036,0.00010584509,0.07756877,0.00010919374,0.00043054685,0.000016320058,0.0048036007,0.83904433,0.004224079,0.06153442,0.008240453,0.0037818216],"study_design_scores_gemma":[0.0013753591,0.00013966762,0.070986286,0.00009278835,0.000035510413,0.000028602713,0.014368088,0.82468075,0.004436161,0.0011835102,0.08201625,0.0006570267],"about_ca_topic_score_codex":0.0015423527,"about_ca_topic_score_gemma":0.0010304454,"teacher_disagreement_score":0.0737758,"about_ca_system_score_codex":0.00021950368,"about_ca_system_score_gemma":0.000037908332,"threshold_uncertainty_score":0.99908435},"labels":[],"label_agreement":null},{"id":"W4308090776","doi":"10.1109/ccece49351.2022.9918351","title":"A Novel Flexible and Scalable Nonintrusive Load Monitoring Approach Using Wavelet Design and Machine Learning","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scalability; Computer science; Wavelet; Flexibility (engineering); Cluster analysis; Classifier (UML); Artificial intelligence; Decision tree; Machine learning","score_opus":0.03525433294900176,"score_gpt":0.21003107570915916,"score_spread":0.1747767427601574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308090776","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11471332,0.0009264225,0.87725115,0.000017642073,0.00029343093,0.00022363805,0.0000020466948,0.00043376384,0.0061385855],"genre_scores_gemma":[0.78609914,0.00008090478,0.21232595,0.000021033307,0.00011239329,0.00006249205,0.0000045842016,0.00006739674,0.0012260966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990217,0.000040364757,0.0001463453,0.0002614588,0.00023036369,0.00029974474],"domain_scores_gemma":[0.99970084,0.00005368544,0.000022813372,0.00013153526,0.000016764456,0.000074353666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004304197,0.00017459465,0.0001678639,0.00011957117,0.00031950182,0.000077437486,0.00008999075,0.000028251612,0.00006006283],"category_scores_gemma":[0.00001494315,0.00019037328,0.000018287294,0.00023770932,0.00002307852,0.00013658147,0.0003409799,0.00026034078,0.0000015061361],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000913371,0.000016822269,0.0010990205,0.00004671391,0.00005648946,0.0000048250286,0.00023826331,0.9861027,0.010398906,0.00024187744,0.00007388557,0.0017113893],"study_design_scores_gemma":[0.00045130413,0.000034800632,0.0003336892,0.000008378557,0.000024615058,0.000056188186,0.0004002517,0.99066424,0.004845843,0.000017578632,0.0029356845,0.00022740306],"about_ca_topic_score_codex":0.00026255296,"about_ca_topic_score_gemma":0.0000011033515,"teacher_disagreement_score":0.6713858,"about_ca_system_score_codex":0.00021912777,"about_ca_system_score_gemma":0.000014058292,"threshold_uncertainty_score":0.7763197},"labels":[],"label_agreement":null},{"id":"W4308091082","doi":"10.1109/ccece49351.2022.9918403","title":"Non-Intrusive Load Monitoring Using Machine Learning Accelerator Hardware for Smart Meters","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Bottleneck; Computer science; Metering mode; Electricity; Flexibility (engineering); Electricity meter; Smart meter; Acceleration; Real-time computing; Embedded system; Smart grid; Energy (signal processing); Hardware acceleration; Energy consumption; Efficient energy use; Computer hardware; Field-programmable gate array; Engineering; Power (physics)","score_opus":0.02254828080235829,"score_gpt":0.23142743313708602,"score_spread":0.20887915233472773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308091082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9228231,0.00037484165,0.06498473,0.00007802733,0.0055669188,0.00063323946,0.000024361632,0.0011058891,0.0044089314],"genre_scores_gemma":[0.98632306,0.000015768335,0.011574305,0.00005601901,0.00038506003,0.00026857285,0.000022284128,0.00011029387,0.0012446591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988194,0.00001991947,0.00021824177,0.0002541815,0.00029557885,0.00039268093],"domain_scores_gemma":[0.999587,0.000046835743,0.000035003242,0.00021217941,0.00004273497,0.000076260636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021933316,0.00020955148,0.00020287331,0.00013852675,0.0003725257,0.00006875029,0.00023112229,0.00002893992,0.00034402686],"category_scores_gemma":[0.00002099792,0.0002383333,0.00010457332,0.00023755104,0.000008820274,0.00015638856,0.00025885753,0.00024740625,0.000010528876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014192209,0.00000994985,0.005694077,0.000051411975,0.00014392626,0.000009649725,0.00022438997,0.98132056,0.010568773,0.00004289194,0.000979715,0.00094043557],"study_design_scores_gemma":[0.00066923775,0.00006980006,0.00047587007,0.000013390797,0.000058293495,0.000005559877,0.0007855278,0.8742607,0.034510147,0.000014278837,0.088728525,0.00040864915],"about_ca_topic_score_codex":0.00019880387,"about_ca_topic_score_gemma":0.000014806572,"teacher_disagreement_score":0.107059866,"about_ca_system_score_codex":0.00067548687,"about_ca_system_score_gemma":0.000021391164,"threshold_uncertainty_score":0.97189504},"labels":[],"label_agreement":null},{"id":"W4308391685","doi":"10.3390/electronics11213610","title":"Maximizing the Electricity Cost-Savings for Local Distribution System Using a New Peak-Shaving Approach Based on Mixed Integer Linear Programming","year":2022,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Emera","keywords":"Peaking power plant; Integer programming; Linear programming; Electricity; Mathematical optimization; Computer science; Energy storage; Power (physics); Automotive engineering; Distributed generation; Reliability engineering; Algorithm; Engineering; Renewable energy; Mathematics; Electrical engineering","score_opus":0.016028608695632524,"score_gpt":0.21426051236145352,"score_spread":0.198231903665821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308391685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008024906,0.001002887,0.9884352,0.00012197119,0.00043585105,0.0012022383,0.000019078998,0.00060826965,0.00014958445],"genre_scores_gemma":[0.9920492,0.000010979472,0.0063304855,0.00010604474,0.00030600512,0.00065137964,0.0003825202,0.0001153911,0.000047964346],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978636,0.000095614974,0.00033636577,0.00036883855,0.00045284952,0.0008827543],"domain_scores_gemma":[0.9992411,0.0001371351,0.00009206142,0.0003897144,0.000057955618,0.000082029896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008702085,0.0002895476,0.00024920484,0.00011207991,0.00060355186,0.00010015325,0.0004303237,0.00006750562,0.000006459606],"category_scores_gemma":[0.00006859728,0.00027333747,0.00015877919,0.00072813116,0.000017555654,0.00008200794,0.00011642765,0.0006524682,0.0000021999858],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005498306,0.000045301884,0.000015855596,0.000111814355,0.000059498303,0.0000022312138,0.000058005906,0.9794462,0.00024431574,0.002685922,0.0016888757,0.015587036],"study_design_scores_gemma":[0.00043739396,0.00014644205,0.000009449929,0.000027341286,0.00008154399,0.0000131750985,0.00027824767,0.86828095,0.0010951948,0.000014816472,0.12935936,0.00025606772],"about_ca_topic_score_codex":0.0000499073,"about_ca_topic_score_gemma":0.00001575208,"teacher_disagreement_score":0.98402435,"about_ca_system_score_codex":0.0035751523,"about_ca_system_score_gemma":0.0001611743,"threshold_uncertainty_score":0.99997187},"labels":[],"label_agreement":null},{"id":"W4308512602","doi":"10.3390/jrfm15110521","title":"Energy Communities Overview: Managerial Policies, Economic Aspects, Technologies, and Models","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Context (archaeology); Greenhouse gas; Autonomy; Renewable energy; Business; Energy transition; European union; Environmental resource management; Environmental economics; Energy policy; Efficient energy use; Empowerment; Political science; Economic growth; Economics; Engineering; Geography; Ecology; Economic policy","score_opus":0.008927111932370899,"score_gpt":0.17999847193222474,"score_spread":0.17107135999985384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308512602","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68713665,0.10535301,0.16056024,0.00081088,0.00888598,0.0006558555,0.00020946555,0.00084981555,0.03553812],"genre_scores_gemma":[0.9279483,0.071047984,0.00064584217,0.000078236706,0.00016007594,0.000021585582,0.0000035375815,0.000024042658,0.00007038031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991129,0.000045650882,0.0003544289,0.00009679484,0.00017023615,0.00022000921],"domain_scores_gemma":[0.9995733,0.000029304567,0.00013465843,0.0002125346,0.000010950111,0.000039266062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031471386,0.00016931731,0.00027626485,0.00042468373,0.00025528698,0.000062664745,0.00029717918,0.000036385172,0.000019974537],"category_scores_gemma":[0.0000028069,0.00017711883,0.000060695784,0.00013118281,0.000059656497,0.0001817311,0.0006620005,0.00025063174,5.9603366e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053799202,0.000035217574,0.00024548138,0.00007887548,0.00012693324,0.00008396662,0.00047180304,0.47470167,0.0000025467525,0.28097638,0.01382848,0.22939484],"study_design_scores_gemma":[0.0010493832,0.00018451801,0.0026690643,0.00003170692,0.00013683172,0.0000530033,0.004408794,0.03295306,0.000018763802,0.04699284,0.9111844,0.00031768234],"about_ca_topic_score_codex":0.00033431425,"about_ca_topic_score_gemma":0.00020013019,"teacher_disagreement_score":0.89735585,"about_ca_system_score_codex":0.00019213182,"about_ca_system_score_gemma":0.000009990364,"threshold_uncertainty_score":0.7222696},"labels":[],"label_agreement":null},{"id":"W4309708571","doi":"10.3390/electronics11223769","title":"A New Energy-Aware Method for Gas Lift Allocation in IoT-Based Industries Using a Chemical Reaction-Based Optimization Algorithm","year":2022,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Gas lift; Computer science; Flexibility (engineering); Fossil fuel; Process engineering; Lift (data mining); Rate of convergence; Production (economics); Energy supply; Petrochemical; Mathematical optimization; Algorithm; Environmental science; Engineering; Petroleum engineering; Energy (signal processing); Environmental engineering; Waste management; Mathematics; Channel (broadcasting); Telecommunications; Data mining","score_opus":0.011300546956847466,"score_gpt":0.2343440078441919,"score_spread":0.22304346088734445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309708571","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014305785,0.00039704464,0.99719197,0.0002770687,0.00022957442,0.00020273274,0.0000075710504,0.00021952303,0.00004394432],"genre_scores_gemma":[0.104105726,0.000048557657,0.8925406,0.0005582294,0.00048059702,0.00079330965,0.001104628,0.00021612874,0.00015223799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988937,0.00005290098,0.00023830918,0.00023816396,0.00021559061,0.00036134955],"domain_scores_gemma":[0.9995616,0.00009668646,0.00005408713,0.00019822424,0.000036692032,0.000052695923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024537885,0.00016648672,0.00015924893,0.00023534716,0.00008975052,0.000026910398,0.00013832717,0.00008752052,0.00003913806],"category_scores_gemma":[0.000024438275,0.00022130323,0.000050345025,0.00069130753,0.0000059322156,0.00006032229,0.000025635793,0.0002495542,3.206242e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024107498,0.000029417064,0.000007084391,0.000012946459,0.000024855215,0.0000010460682,0.00001859087,0.9554612,0.0029747917,0.0002710889,0.0010409197,0.04013392],"study_design_scores_gemma":[0.00077816256,0.000056957924,0.000001903022,0.000009242923,0.000030158846,0.0000015911522,0.00002616422,0.921424,0.033870686,0.00009469073,0.043507617,0.00019885573],"about_ca_topic_score_codex":0.00013866287,"about_ca_topic_score_gemma":0.0000647174,"teacher_disagreement_score":0.10465138,"about_ca_system_score_codex":0.0014552035,"about_ca_system_score_gemma":0.0004046471,"threshold_uncertainty_score":0.90244836},"labels":[],"label_agreement":null},{"id":"W4309760235","doi":"10.1049/stg2.12095","title":"Evolution of smart grids towards the Internet of energy: Concept and essential components for deep decarbonisation","year":2022,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":222,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Interoperability; Computer science; Smart grid; The Internet; Greenhouse gas; Energy consumption; World Wide Web; Engineering; Electrical engineering","score_opus":0.011049292196158094,"score_gpt":0.20212882473808133,"score_spread":0.19107953254192322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309760235","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89308846,0.0007750654,0.09972456,0.00016942307,0.0047844974,0.00035248106,0.00008617306,0.000114071954,0.00090525596],"genre_scores_gemma":[0.9990758,0.00002091089,0.00027975472,0.000030922933,0.00023045721,0.00015286302,0.00011025494,0.000028985736,0.00007009285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896896,0.000062402025,0.0003311367,0.0001699024,0.0002821677,0.00018542448],"domain_scores_gemma":[0.9995343,0.000056090386,0.000093107454,0.00023722538,0.000044787834,0.00003446915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024655886,0.00014085944,0.00020761322,0.00010220133,0.00007619822,0.000012072341,0.00022126485,0.000035976685,0.000052558724],"category_scores_gemma":[0.000014211267,0.00013265193,0.0000856974,0.00015926578,0.00009042038,0.00007253482,0.00019618309,0.00008482917,4.649985e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004229677,0.00027435867,0.01959729,0.00040201182,0.000943359,0.0000048096203,0.003102207,0.85534036,0.02365185,0.041107167,0.048732445,0.0064212037],"study_design_scores_gemma":[0.002087635,0.0004543667,0.0632989,0.00003814383,0.00021406071,0.000012278489,0.00046536804,0.79272395,0.04638648,0.0009830343,0.09289818,0.00043756448],"about_ca_topic_score_codex":0.0005249713,"about_ca_topic_score_gemma":0.00010300024,"teacher_disagreement_score":0.10598729,"about_ca_system_score_codex":0.0001448579,"about_ca_system_score_gemma":0.000016466085,"threshold_uncertainty_score":0.54093885},"labels":[],"label_agreement":null},{"id":"W4310521395","doi":"10.1109/ecce50734.2022.9948154","title":"A Multi-Parameter Approach to Optimal Power Dispatch in Grid-Connected Photovoltaic-Battery Systems","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Energy Conversion Congress and Exposition (ECCE)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; Carleton University","funders":"","keywords":"Photovoltaic system; Tariff; Computer science; Profit (economics); Stand-alone power system; Grid-connected photovoltaic power system; Grid; Battery (electricity); Electricity; Electric power system; Electricity pricing; Grid parity; Automotive engineering; Mathematical optimization; Power (physics); Maximum power point tracking; Renewable energy; Distributed generation; Engineering; Electricity market; Electrical engineering; Photovoltaics; Business; Economics; Mathematics; Microeconomics; Voltage","score_opus":0.008902420368573763,"score_gpt":0.1893032252704862,"score_spread":0.18040080490191246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310521395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95900756,0.00040623886,0.029222695,0.00007841735,0.009489555,0.00043369457,0.000075622855,0.0003398604,0.00094634783],"genre_scores_gemma":[0.9966941,0.00006789218,0.0007872026,0.0004307904,0.00015882355,0.0007444257,0.00022026185,0.00007001151,0.0008265316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797,0.00016790058,0.00041736843,0.000575273,0.00040539293,0.00046410976],"domain_scores_gemma":[0.9992361,0.00008790552,0.00006630991,0.00036930465,0.00004101995,0.00019935759],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020960408,0.00033374588,0.00037135155,0.0004935535,0.00023182684,0.00011691791,0.0002722772,0.000093478084,0.0004006328],"category_scores_gemma":[0.000008759994,0.00037536994,0.00008921468,0.00051338796,0.000037363174,0.00022580707,0.00026307453,0.00026176596,0.000018863024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012091484,0.00017496159,0.0006386252,0.000075374,0.00011296004,0.000079262,0.0006950287,0.95145833,0.016824277,0.0001269095,0.029544398,0.00014893609],"study_design_scores_gemma":[0.0020589442,0.00018225222,0.0012844699,0.000052574003,0.000038008548,0.000037840546,0.0027977542,0.94578475,0.0067652483,0.0000020275156,0.040290836,0.0007053194],"about_ca_topic_score_codex":0.00054415717,"about_ca_topic_score_gemma":0.000018937704,"teacher_disagreement_score":0.037686493,"about_ca_system_score_codex":0.00029462238,"about_ca_system_score_gemma":0.000013910569,"threshold_uncertainty_score":0.9998698},"labels":[],"label_agreement":null},{"id":"W4310584278","doi":"10.1109/smartgridcomm52983.2022.9961058","title":"PEMT-CoSim: A Co-Simulation Platform for Packetized Energy Management and Trading in Distributed Energy Systems","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed generation; Smart grid; Computer science; Energy management; Distributed computing; Energy management system; Network packet; Co-simulation; Electricity; Energy (signal processing); Embedded system; Renewable energy; Engineering; Computer network; Electrical engineering","score_opus":0.014776388784406323,"score_gpt":0.2142238404722889,"score_spread":0.19944745168788258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310584278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057063986,0.00061438465,0.9272616,0.00005672356,0.0011981967,0.0006391813,0.0001281845,0.0007369362,0.012300798],"genre_scores_gemma":[0.99740034,0.00006252635,0.00029004298,0.00004866964,0.0000621056,0.00092159037,0.0004314815,0.00004606835,0.0007371894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988379,0.0000246609,0.0003295544,0.00025554336,0.00022246919,0.00032987224],"domain_scores_gemma":[0.999598,0.00009985405,0.00003574562,0.0001959921,0.000010193591,0.0000601662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021672624,0.00018959057,0.0002231458,0.0002796843,0.00010611122,0.000058798236,0.00012987184,0.00003681434,0.000054404303],"category_scores_gemma":[0.0000038186786,0.00021102662,0.000044071345,0.0003009765,0.000010018747,0.00012025142,0.0000856211,0.000058485064,4.9790407e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041393178,0.000024644844,0.00015589806,0.000098296114,0.00009002599,0.000011149753,0.000058022135,0.9515018,0.00004190239,0.04121263,0.0048771915,0.0018870832],"study_design_scores_gemma":[0.0012509412,0.000034112647,0.0004130705,0.000011809283,0.000020375363,0.000002250935,0.0003322699,0.82619274,0.00010783958,0.000274286,0.171149,0.00021129963],"about_ca_topic_score_codex":0.00014030524,"about_ca_topic_score_gemma":0.00006588876,"teacher_disagreement_score":0.94033635,"about_ca_system_score_codex":0.0003817918,"about_ca_system_score_gemma":0.0000038114695,"threshold_uncertainty_score":0.8605416},"labels":[],"label_agreement":null},{"id":"W4310870095","doi":"10.18280/ijsdp.170701","title":"Digital Platforms for Renewable Energy Communities Projects: An Overview","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Politecnico di Torino","keywords":"Renewable energy; Energy policy; Directive; Environmental economics; Flexibility (engineering); Legislation; Legislature; European union; Work (physics); Energy consumption; Energy transition; Nuclear decommissioning; Energy engineering; Engineering; Business; Economics; Political science; Computer science; Economic policy; Law; Management","score_opus":0.033909613470548876,"score_gpt":0.24958918481096956,"score_spread":0.21567957134042068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310870095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97128767,0.0021292537,0.022514291,0.000059645536,0.0010308718,0.00010683289,0.000011052489,0.000060320857,0.0028000623],"genre_scores_gemma":[0.99606603,0.00007307445,0.0016546546,0.000102501,0.00015861716,0.000043644864,0.00008911635,0.000021749287,0.0017906382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99915665,0.000007239942,0.0002909139,0.00005400865,0.00030325566,0.00018792167],"domain_scores_gemma":[0.99954724,0.00006931626,0.00009287737,0.00005111644,0.00019235762,0.00004710949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040882756,0.00010272783,0.00012390017,0.00034162067,0.0001932085,0.00015615296,0.00030102243,0.000017261216,0.000027911368],"category_scores_gemma":[0.000016294021,0.00010186968,0.000030157615,0.00008288456,0.000010739331,0.0006714157,0.00016130271,0.00009741746,1.14878276e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002833799,0.000043807016,0.0019583064,0.00007476696,0.00037543316,0.0003926176,0.009446374,0.97146624,0.000012896225,0.003848091,0.0061991573,0.0058989013],"study_design_scores_gemma":[0.0009285917,0.00017645404,0.0010212803,0.000075794844,0.000012238414,0.00015721486,0.13870576,0.020373005,0.00038511096,0.001973631,0.83593124,0.00025967235],"about_ca_topic_score_codex":0.000027282475,"about_ca_topic_score_gemma":0.0000041526932,"teacher_disagreement_score":0.95109326,"about_ca_system_score_codex":0.00030660213,"about_ca_system_score_gemma":0.000084753345,"threshold_uncertainty_score":0.41541252},"labels":[],"label_agreement":null},{"id":"W4311132172","doi":"10.3390/s22249631","title":"Design and Implementation of an Open-Source SCADA System for a Community Solar-Powered Reverse Osmosis System","year":2022,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Open source; Reverse osmosis; SCADA; Embedded system; Computer science; Engineering; Photovoltaic system; Environmental science; Operating system; Systems engineering; Process engineering; Electrical engineering; Chemistry; Software; Membrane","score_opus":0.023660585038036086,"score_gpt":0.24762801943340762,"score_spread":0.22396743439537153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311132172","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98064834,0.00003057568,0.017216334,0.000016845353,0.00034713114,0.0011084543,0.00005386333,0.00026180764,0.0003166582],"genre_scores_gemma":[0.9948901,0.0000027451706,0.0047018393,0.000013918786,0.000020208248,0.00023269617,0.000042368243,0.00004649481,0.000049629154],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998887,0.00039850193,0.00025994936,0.00012828961,0.00015064425,0.00017559585],"domain_scores_gemma":[0.99938035,0.0001019162,0.00007505693,0.0003629331,0.00002922974,0.000050488925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000961991,0.00011963214,0.0002063786,0.000089082234,0.000312969,0.000040638057,0.00027946025,0.000023171735,0.000011855538],"category_scores_gemma":[0.0000055937094,0.00013966272,0.000025433363,0.00014941995,0.000012768858,0.000106987936,0.00023206396,0.00010423435,9.866841e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006379695,0.00002651329,0.00014749038,0.00096948247,0.00015392325,0.000004001057,0.0023775368,0.9900195,0.0028190366,0.00048862485,0.0016264516,0.0013036219],"study_design_scores_gemma":[0.0028974568,0.00062755006,0.001461332,0.00011794162,0.00019783978,0.000042523345,0.18508525,0.77642024,0.022633152,0.000012993904,0.010022589,0.00048110605],"about_ca_topic_score_codex":0.0015668108,"about_ca_topic_score_gemma":0.00009291626,"teacher_disagreement_score":0.21359926,"about_ca_system_score_codex":0.00028937345,"about_ca_system_score_gemma":0.000010111319,"threshold_uncertainty_score":0.56952804},"labels":[],"label_agreement":null},{"id":"W4311681040","doi":"10.22215/etd/2022-15188","title":"Vulnerability Assessment of Machine Learning Based Short-Term Residential Load Forecast against Cyber Attacks on Smart Meters","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Nonlinear autoregressive exogenous model; Support vector machine; Machine learning; Decision tree; Computer science; Artificial intelligence; Term (time); Vulnerability (computing); Artificial neural network; Random forest; Smart grid; Long short term memory; Data mining; Engineering; Recurrent neural network; Computer security","score_opus":0.015662721897275265,"score_gpt":0.2801262334600096,"score_spread":0.26446351156273434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311681040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75918096,0.00009527925,0.0030003143,0.000032459004,0.003665036,0.00077159185,0.000051726533,0.0006377682,0.23256484],"genre_scores_gemma":[0.9867654,0.000049144626,0.00066500827,0.000054905162,0.00011954253,0.0002889926,0.005339796,0.00018344342,0.0065337745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968373,0.0001935507,0.000783641,0.00062093994,0.0011424191,0.00042212897],"domain_scores_gemma":[0.9987898,0.00016525025,0.0001477647,0.0006956724,0.00009643142,0.00010507484],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0007354142,0.00057192007,0.000643034,0.0004239234,0.0001597565,0.00006339633,0.00040328212,0.00020238625,0.0028697092],"category_scores_gemma":[0.000055457633,0.00060927705,0.00035464397,0.00030061055,0.000023994975,0.00010648922,0.00008504034,0.0010274505,0.000009111084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008272883,0.0001109879,0.005891661,0.0005937347,0.00040203778,0.000025445392,0.00010576368,0.9849559,0.001113421,0.00008801897,0.0028337128,0.003796572],"study_design_scores_gemma":[0.0012360291,0.00040607693,0.11023231,0.00027141627,0.0004115564,7.4053185e-7,0.00044437926,0.8518034,0.010811242,0.000011792058,0.022902843,0.0014681941],"about_ca_topic_score_codex":0.00037926878,"about_ca_topic_score_gemma":0.0029098126,"teacher_disagreement_score":0.2275844,"about_ca_system_score_codex":0.0010445231,"about_ca_system_score_gemma":0.00010769114,"threshold_uncertainty_score":0.9996359},"labels":[],"label_agreement":null},{"id":"W4312261981","doi":"10.1109/pesgm48719.2022.9917077","title":"Behind-the-Meter Solar Generation Disaggregation via Universal Adaptive Stabilization","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Computer science; Electricity generation; Metre; Hidden Markov model; Power (physics); Control engineering; Real-time computing; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.015751081061584956,"score_gpt":0.201110337774893,"score_spread":0.18535925671330805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312261981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43171975,0.00096847484,0.5549918,0.0006862336,0.00760135,0.00040761355,0.000071873736,0.00090001046,0.002652912],"genre_scores_gemma":[0.980789,0.00023608029,0.009412088,0.0009878392,0.0016119434,0.00037339402,0.00095647684,0.00022769878,0.005405446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9966886,0.00045856187,0.0005645484,0.000665883,0.00095479056,0.0006675891],"domain_scores_gemma":[0.99875075,0.00009563496,0.00020557744,0.000699241,0.00011710496,0.00013166951],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009485173,0.00047759459,0.00031313804,0.00012619939,0.0011854419,0.0001282407,0.00051619194,0.00014603857,0.00060341257],"category_scores_gemma":[0.00002763213,0.0004998391,0.00039186576,0.00068151194,0.000094519106,0.00036441776,0.0003074119,0.00048585195,0.000024133758],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014482217,0.000051239065,0.00012259529,0.000010431053,0.00027630717,0.0000021836972,0.0035498794,0.8859867,0.055898663,0.00059115875,0.0523182,0.0011781577],"study_design_scores_gemma":[0.0005908848,0.000085714164,0.00007915112,0.000011918833,0.00013480053,0.000008941696,0.00075888145,0.71312255,0.009435823,0.0002002726,0.27480817,0.00076288247],"about_ca_topic_score_codex":0.00038918524,"about_ca_topic_score_gemma":0.000777959,"teacher_disagreement_score":0.5490693,"about_ca_system_score_codex":0.0010923445,"about_ca_system_score_gemma":0.000049069422,"threshold_uncertainty_score":0.9997453},"labels":[],"label_agreement":null},{"id":"W4312338959","doi":"10.1109/iscc55528.2022.9912852","title":"A Federated Learning Model With Short Sequence To Point Mechanism For Smart Home Energy Disaggregation","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Symposium on Computers and Communications (ISCC)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Energy consumption; Server; Computer security; Residence; Consumption (sociology); Home automation; Electricity; Point (geometry); Computer network; Telecommunications; Engineering","score_opus":0.018550706309554407,"score_gpt":0.21948053651404828,"score_spread":0.20092983020449387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312338959","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032621577,0.000058704205,0.961425,0.002859441,0.00040551173,0.00044980482,0.0000330673,0.00042096793,0.0017259343],"genre_scores_gemma":[0.98337805,0.00020234766,0.013758864,0.000728627,0.000034036497,0.0012448713,0.0001883772,0.00006377767,0.00040107404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988878,0.00009506255,0.00023581981,0.00030146714,0.00022732076,0.00025256316],"domain_scores_gemma":[0.9990332,0.00009769503,0.000040430987,0.00067377737,0.00005716286,0.00009771298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019313322,0.00021145152,0.00019202141,0.00020526523,0.0008902045,0.00012399022,0.0005124711,0.000030626386,0.0000046654077],"category_scores_gemma":[0.0000026193934,0.00022916899,0.00004880267,0.0003499336,0.000030454006,0.000111582725,0.0003863599,0.00023487535,0.0000018841015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026837295,0.000054276945,0.000018141456,0.000012556402,0.00007524245,0.0000013482351,0.0003544166,0.9665787,0.004250799,0.024637392,0.0015441391,0.002446157],"study_design_scores_gemma":[0.00031846142,0.00033362806,0.000013580973,0.000029737905,0.000027429016,0.000009345341,0.00017289577,0.9918678,0.0007999363,0.0004914485,0.0056358227,0.00029990426],"about_ca_topic_score_codex":0.00005554807,"about_ca_topic_score_gemma":0.00010002182,"teacher_disagreement_score":0.95075643,"about_ca_system_score_codex":0.00024679405,"about_ca_system_score_gemma":0.000022641276,"threshold_uncertainty_score":0.93452406},"labels":[],"label_agreement":null},{"id":"W4312469297","doi":"10.1109/access.2022.3215954","title":"A Computationally Efficient Method for Energy Allocation in Spot Markets With Application to Transactive Energy Systems","year":2022,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Transactive memory; Computer science; Energy (signal processing); Knowledge management; Mathematics; Statistics","score_opus":0.00887655042569164,"score_gpt":0.24860413228910228,"score_spread":0.23972758186341064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312469297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014580546,0.000047853777,0.98365873,0.000111434856,0.0004173382,0.00042168787,0.000019266623,0.00012743681,0.00061568484],"genre_scores_gemma":[0.9902554,0.0000030448891,0.0044840346,0.00017993679,0.000081590115,0.0048025,0.00007246946,0.000045213656,0.000075806915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892807,0.000072882714,0.00022625056,0.0002868516,0.00028357955,0.00020238814],"domain_scores_gemma":[0.99952465,0.00013484157,0.000044831137,0.00018721247,0.00005789244,0.00005056478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028095528,0.00014103139,0.00015958994,0.00028719477,0.000076558055,0.00005209254,0.00030734736,0.000025278987,0.000007770231],"category_scores_gemma":[0.0000025547902,0.00015416813,0.000027771308,0.0005856961,0.0000056111335,0.00009016538,0.00002786072,0.000052574305,7.695575e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106693005,0.000054032826,0.000015177175,0.000043110165,0.000043056854,0.0000020243103,0.00014304103,0.9861901,0.0008107403,0.003456878,0.0005346598,0.008600496],"study_design_scores_gemma":[0.0004852235,0.0000420193,0.0011900433,0.00001216792,0.000016136373,0.000003314873,0.00007948842,0.98024625,0.0025826388,0.00007975792,0.015071166,0.00019178606],"about_ca_topic_score_codex":0.0005995091,"about_ca_topic_score_gemma":0.0002874104,"teacher_disagreement_score":0.97917473,"about_ca_system_score_codex":0.00038184397,"about_ca_system_score_gemma":0.000024046001,"threshold_uncertainty_score":0.6286794},"labels":[],"label_agreement":null},{"id":"W4312568251","doi":"10.1109/pesgm48719.2022.9917106","title":"Peer-to-Peer Energy Trading in Smart Grid Considering Power Losses and Network Fees","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Clearing; Peer-to-peer; Market clearing; Smart grid; Grid; Computer science; Electricity market; Electricity; Environmental economics; Energy market; Distributed generation; Business; Industrial organization; Microeconomics; Distributed computing; Renewable energy; Finance; Economics; Electrical engineering","score_opus":0.013305499285417707,"score_gpt":0.218062308723323,"score_spread":0.20475680943790528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312568251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94512004,0.0049709054,0.013081647,0.0033575601,0.015114396,0.00031605278,0.0000829389,0.0013493444,0.016607132],"genre_scores_gemma":[0.9638507,0.0004000853,0.015164943,0.0037784746,0.0016957421,0.00050668704,0.00018821508,0.00039262796,0.014022526],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9945269,0.00031594135,0.0009527565,0.0011219024,0.0014619338,0.0016205317],"domain_scores_gemma":[0.99823135,0.000285017,0.00015768153,0.0007880046,0.00013664643,0.00040129587],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018980686,0.00082078006,0.0008060463,0.00028770659,0.0007932513,0.00024004267,0.0006385702,0.00021200917,0.00064289273],"category_scores_gemma":[0.00013020476,0.0010018715,0.00040414045,0.0013746755,0.00011382934,0.00025012586,0.0007507266,0.00072891155,0.000011511341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018156601,0.000047857462,0.0018056534,0.000025923922,0.00026537065,0.000028847599,0.0024533232,0.6962061,0.006261465,0.0009447665,0.29154864,0.00039386182],"study_design_scores_gemma":[0.0007819397,0.0000771383,0.00054142653,0.000070381204,0.00005815921,0.000049037546,0.0008451295,0.03885852,0.001453061,0.00036974685,0.9555924,0.001303048],"about_ca_topic_score_codex":0.0012001251,"about_ca_topic_score_gemma":0.0016259478,"teacher_disagreement_score":0.6640438,"about_ca_system_score_codex":0.00072833936,"about_ca_system_score_gemma":0.00006187006,"threshold_uncertainty_score":0.99924314},"labels":[],"label_agreement":null},{"id":"W4313024944","doi":"10.1109/pesgm48719.2022.9916720","title":"LMP-Based Day-Ahead Electricity Market Design Considering the Participation of DR and BESS","year":2022,"lang":"en","type":"article","venue":"2022 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Electricity market; Renewable energy; Electricity; Grid; Computer science; Settlement (finance); Integer programming; Reliability engineering; Electric power system; Operations research; Environmental economics; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.02323801296313731,"score_gpt":0.23144847297005572,"score_spread":0.2082104600069184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313024944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7981727,0.0021388514,0.19270349,0.0007989237,0.0023728213,0.00038414643,0.000035395726,0.0005454548,0.002848192],"genre_scores_gemma":[0.98822486,0.0001861469,0.008583692,0.0008789256,0.00024048706,0.00040276477,0.000042694763,0.00011823988,0.0013221975],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969542,0.0006395914,0.0005875299,0.00047763702,0.0006657554,0.00067527086],"domain_scores_gemma":[0.99852085,0.0005249266,0.00018393014,0.0005761235,0.00007070572,0.00012344275],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0021052803,0.00037780887,0.0003886683,0.00009927849,0.00061147986,0.00006721761,0.0003745245,0.00009827638,0.0002576812],"category_scores_gemma":[0.000104273146,0.0003752277,0.00024217983,0.0007063237,0.000118112664,0.00010047696,0.00021583718,0.00039294543,0.0000021563715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023033303,0.00005351477,0.00048068466,0.000040855295,0.00023085825,0.0000023112493,0.0011228303,0.889146,0.038255554,0.00021943136,0.069866486,0.0005584894],"study_design_scores_gemma":[0.00092800567,0.00011037108,0.0007849056,0.000036328915,0.00018278102,0.0000073070432,0.0003138665,0.80792075,0.049035143,0.0002718499,0.13962716,0.00078150915],"about_ca_topic_score_codex":0.00033269884,"about_ca_topic_score_gemma":0.0001544623,"teacher_disagreement_score":0.19005212,"about_ca_system_score_codex":0.00029474281,"about_ca_system_score_gemma":0.00005832167,"threshold_uncertainty_score":0.99986994},"labels":[],"label_agreement":null},{"id":"W4313315997","doi":"10.1109/ibcast54850.2022.9990113","title":"Flexibility based Coordination Framework For Three-Level Energy Management System","year":2022,"lang":"en","type":"article","venue":"2022 19th International Bhurban Conference on Applied Sciences and Technology (IBCAST)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Flexibility (engineering); Computer science; Energy management; Systems engineering; Embedded system; Process management; Energy (signal processing); Business; Engineering","score_opus":0.03695857067283527,"score_gpt":0.24659192765909904,"score_spread":0.20963335698626379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313315997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019458793,0.000104942985,0.9111309,0.005010727,0.0027123936,0.0008316263,0.00018369994,0.0011321169,0.05943479],"genre_scores_gemma":[0.98866284,0.000007631736,0.00926414,0.0001686302,0.000057568013,0.001354199,0.00004389439,0.000019417086,0.00042169448],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982696,0.000014742444,0.0002884218,0.0005873818,0.0005208793,0.00031895412],"domain_scores_gemma":[0.9994127,0.00008429031,0.00009216808,0.00030200309,0.00006056603,0.000048245438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004806878,0.00021369128,0.00019286884,0.0006521781,0.00047103106,0.00009211711,0.0008117947,0.00008939042,0.0002722418],"category_scores_gemma":[0.000014656241,0.00022290199,0.00004248792,0.0006265911,0.00022780115,0.000062849576,0.00032985135,0.00023143152,0.0000071421955],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002403888,0.000039585153,0.0002482685,0.000032710737,0.000056144676,0.000004027832,0.000009664066,0.036449637,0.0001825283,0.93762046,0.0013478084,0.023985144],"study_design_scores_gemma":[0.00059158576,0.00017882416,0.00040941534,0.000034252924,0.00002142226,0.000005429636,0.0007217266,0.8838654,0.0010384405,0.07257002,0.04023337,0.00033012134],"about_ca_topic_score_codex":0.000008878588,"about_ca_topic_score_gemma":0.000028529059,"teacher_disagreement_score":0.969204,"about_ca_system_score_codex":0.00032403538,"about_ca_system_score_gemma":0.000033063923,"threshold_uncertainty_score":0.9089679},"labels":[],"label_agreement":null},{"id":"W4313388699","doi":"10.3390/en16010472","title":"A State-of-the-Art Review of Smart Energy Systems and Their Management in a Smart Grid Environment","year":2023,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Smart grid; Distributed generation; Electricity; Energy management system; Computer science; Grid; Demand response; Automation; Electric power system; Energy management; Distributed computing; Engineering; Renewable energy; Electrical engineering; Energy (signal processing); Power (physics)","score_opus":0.019951738586446836,"score_gpt":0.22278384285322242,"score_spread":0.2028321042667756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313388699","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000117665395,0.9955132,0.00009232733,0.000011879801,0.0012782593,0.00065977575,0.000057327063,0.000109976376,0.0022655132],"genre_scores_gemma":[0.000020913156,0.99642324,0.000054690794,0.000017173546,0.00006409974,0.0008825206,0.000056938985,0.00013228111,0.002348165],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974615,0.00018847684,0.0012437246,0.00040043087,0.0003464359,0.00035940832],"domain_scores_gemma":[0.99853784,0.00013248554,0.0002978994,0.0009669525,0.000011991843,0.00005284055],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004931647,0.00057306146,0.0018574125,0.00037799412,0.000024869572,0.000018885443,0.0005282118,0.0001008782,0.000014184437],"category_scores_gemma":[0.000011665459,0.00040741824,0.00035161417,0.0005732319,0.00008636077,0.00005650641,0.0005966766,0.00017203866,0.000018308368],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021502783,0.000037824706,0.0000048287216,0.4530844,0.0012777775,0.000023604198,0.000051249892,0.09896315,4.6709363e-7,0.0015761461,0.017911421,0.42706698],"study_design_scores_gemma":[0.00009210736,0.000015055464,0.000011071359,0.09317849,0.00026446255,0.0000042958154,0.000022207698,0.0004350439,0.000008991636,0.000023867236,0.90563744,0.0003069472],"about_ca_topic_score_codex":0.00008653266,"about_ca_topic_score_gemma":0.00005500136,"teacher_disagreement_score":0.887726,"about_ca_system_score_codex":0.00019313852,"about_ca_system_score_gemma":0.000020950469,"threshold_uncertainty_score":0.99983776},"labels":[],"label_agreement":null},{"id":"W4313484354","doi":"10.1109/tnnls.2022.3232630","title":"Federated Multiagent Deep Reinforcement Learning Approach via Physics-Informed Reward for Multimicrogrid Energy Management","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Neural Networks and Learning Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"National Natural Science Foundation of China","keywords":"Reinforcement learning; Reinforcement; Computer science; Energy (signal processing); Artificial intelligence; Psychology; Physics; Social psychology","score_opus":0.013597054239743256,"score_gpt":0.20906301034681374,"score_spread":0.1954659561070705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313484354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045535606,0.00015268296,0.99053323,0.000017243798,0.002080995,0.0006909222,0.0000011710498,0.001450084,0.0005201359],"genre_scores_gemma":[0.9941809,0.0007504114,0.00034240136,0.00004143197,0.0003306214,0.0009259372,0.00010922387,0.0001225658,0.003196463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99800104,0.00010778631,0.0004918033,0.00043593437,0.00026739063,0.0006960503],"domain_scores_gemma":[0.99936324,0.00015916544,0.00009575466,0.00018459323,0.00004733129,0.00014990843],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027573056,0.00041361034,0.00036713964,0.00022835194,0.0007815934,0.0002270436,0.000120226025,0.00013582513,0.000006376119],"category_scores_gemma":[0.0000026134792,0.0004172387,0.00016694053,0.00050874305,0.000032980868,0.00016435902,0.0000072035577,0.00050832174,0.000011647755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051045787,0.000023909537,0.0000129786895,0.0003209417,0.0003480179,0.0000077355835,0.00018603801,0.94991964,0.000051304938,0.000026962029,0.0005355384,0.04851591],"study_design_scores_gemma":[0.0010180903,0.00015581313,0.000044078497,0.00008425019,0.00008696789,0.0000073493675,0.0004492446,0.98604745,0.000118193064,6.762662e-7,0.011562201,0.00042569058],"about_ca_topic_score_codex":0.00009116999,"about_ca_topic_score_gemma":0.000012470909,"teacher_disagreement_score":0.9901908,"about_ca_system_score_codex":0.00016447755,"about_ca_system_score_gemma":0.0000042641145,"threshold_uncertainty_score":0.9998279},"labels":[],"label_agreement":null},{"id":"W4313646566","doi":"10.3390/electronics12020287","title":"Blockchain-Based Peer-to-Peer Energy Trading System Using Open-Source Angular Framework and Hypertext Transfer Protocol","year":2023,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Memorial University of Newfoundland","funders":"","keywords":"Computer science; Blockchain; Computer security; Smart contract; Peer-to-peer; Server; The Internet; Hypertext Transfer Protocol; Computer network; Operating system","score_opus":0.015968091220227302,"score_gpt":0.24488626805448127,"score_spread":0.22891817683425397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313646566","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34182498,0.000497342,0.6222553,0.0010050052,0.00068799837,0.027515698,0.00001384652,0.0033630957,0.002836713],"genre_scores_gemma":[0.9728507,0.0000044911253,0.0036558004,0.0003230516,0.00034379467,0.021409426,0.000014089168,0.00027680222,0.0011218466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792975,0.00005663826,0.00029989335,0.0004110511,0.0004888615,0.0008138001],"domain_scores_gemma":[0.999238,0.00007782112,0.000017940822,0.00042829756,0.0000646682,0.00017325745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005080927,0.00032136549,0.00032902905,0.0002693931,0.00017935596,0.0001877503,0.0004187294,0.00016132965,0.00002626567],"category_scores_gemma":[0.00003150438,0.0003472797,0.00006725514,0.0009254351,0.000018562105,0.000046383124,0.00008141214,0.0002790795,0.000017543458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029747593,0.000020156765,0.0000351603,0.00022731269,0.00011516019,0.000029421142,0.00034235194,0.98102397,0.0052902796,0.0057353782,0.0024232469,0.0047278176],"study_design_scores_gemma":[0.0005026378,0.00007590152,0.000020685899,0.000132818,0.000032093263,0.000008235347,0.00009078838,0.67172414,0.00937192,0.00006613038,0.31764063,0.0003340104],"about_ca_topic_score_codex":0.00003569743,"about_ca_topic_score_gemma":0.000042223317,"teacher_disagreement_score":0.63102573,"about_ca_system_score_codex":0.00044872094,"about_ca_system_score_gemma":0.000059791288,"threshold_uncertainty_score":0.9998979},"labels":[],"label_agreement":null},{"id":"W4316663540","doi":"10.3390/en16021000","title":"Optimal Management of a Virtual Power Plant Consisting of Renewable Energy Resources and Electric Vehicles Using Mixed-Integer Linear Programming and Deep Learning","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Virtual power plant; Computer science; Benchmark (surveying); Renewable energy; Distributed generation; Energy management; Demand response; Grid; Artificial neural network; Smart grid; Electricity; Distributed computing; Automotive engineering; Mathematical optimization; Engineering; Energy (signal processing); Artificial intelligence; Electrical engineering","score_opus":0.008553499071186894,"score_gpt":0.19789795070945604,"score_spread":0.18934445163826916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4316663540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99305546,0.0019829676,0.0038247176,0.0000051810657,0.00010448744,0.00005263902,0.0000014962426,0.000274807,0.0006982667],"genre_scores_gemma":[0.99288946,0.00074405683,0.006103007,0.0000036541016,0.00003773657,0.000013960995,0.00000709615,0.000043309523,0.00015768643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989152,0.000037931506,0.00031007593,0.00022068364,0.00020200902,0.00031407466],"domain_scores_gemma":[0.9995916,0.000115712086,0.00008191939,0.00013540802,0.00002893855,0.000046425692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024088916,0.00018244806,0.00026721056,0.00033198934,0.000088124376,0.000031966156,0.000092303526,0.00005648853,0.0000035200924],"category_scores_gemma":[0.00002036067,0.00018737688,0.00003751597,0.0004622379,0.000061735605,0.00008677413,0.00020443193,0.00008169371,3.811776e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018626759,0.000009136277,0.00078682706,0.00018004859,0.0001964682,0.000027768427,0.0005560617,0.983754,0.007855856,0.000911952,0.00006455123,0.005638731],"study_design_scores_gemma":[0.00041227674,0.00013096811,0.0016083899,0.00029286678,0.00009392029,0.000011950596,0.0059648207,0.94222236,0.03524987,0.000021134809,0.013682673,0.00030876562],"about_ca_topic_score_codex":0.0002795249,"about_ca_topic_score_gemma":0.00002985321,"teacher_disagreement_score":0.041531608,"about_ca_system_score_codex":0.000024673276,"about_ca_system_score_gemma":0.0000045115767,"threshold_uncertainty_score":0.76410073},"labels":[],"label_agreement":null},{"id":"W4317521089","doi":"10.1016/j.ejor.2023.01.019","title":"Survey of optimization models for power system operation and expansion planning with demand response","year":2023,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Demand response; Grid; Electric power system; Power grid; Term (time); Operations research; Dynamic demand; Power flow; Mathematical optimization; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.09882129180671646,"score_gpt":0.3214608778252245,"score_spread":0.22263958601850803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317521089","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5670373,0.00015665872,0.43181258,0.000081947415,0.00009634865,0.0001696187,0.0000088816305,0.000023364744,0.0006133249],"genre_scores_gemma":[0.9949805,0.000042916832,0.004763509,0.00000454037,0.000056939512,0.000005046649,0.000026527525,0.00003520133,0.000084814696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810225,0.0007853194,0.00034021505,0.000097572214,0.0005280051,0.00014666136],"domain_scores_gemma":[0.99871904,0.00036789995,0.00004475019,0.000093469935,0.00070971163,0.000065138986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009107123,0.00007452254,0.00012516032,0.00040497538,0.0001267346,0.00008953329,0.000115722054,0.000015551244,0.0000071772297],"category_scores_gemma":[0.0002422329,0.000060263035,0.000016447044,0.0002789851,0.000032937307,0.00032848105,0.000040419432,0.00012093754,0.0000032331059],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063039194,0.0000075644075,0.00019206712,0.00004439701,0.00003928219,0.000030366456,0.00035692524,0.99489,0.0019568177,0.00023410436,0.0015192572,0.000098867335],"study_design_scores_gemma":[0.0006664438,0.0004214263,0.038000107,0.00016246324,0.0000045101856,0.000017329985,0.0002919543,0.9597543,0.0004976898,0.0000021870294,0.00011825293,0.000063335065],"about_ca_topic_score_codex":0.000002970963,"about_ca_topic_score_gemma":0.0000011950741,"teacher_disagreement_score":0.42794323,"about_ca_system_score_codex":0.00006147997,"about_ca_system_score_gemma":0.00006704078,"threshold_uncertainty_score":0.31563655},"labels":[],"label_agreement":null},{"id":"W4317619163","doi":"10.3390/en16031150","title":"Applying Energy Justice Principles to Renewable Energy Trading and Allocation in Multi-Unit Buildings","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Norges Forskningsråd","keywords":"Renewable energy; Environmental economics; Incentive; Unit (ring theory); Work (physics); Profit (economics); Energy consumption; Business; Energy storage; Economics; Microeconomics; Engineering; Power (physics); Electrical engineering","score_opus":0.03662233326452331,"score_gpt":0.2420871501321208,"score_spread":0.2054648168675975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317619163","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86498934,0.0013966128,0.11415639,0.00032416094,0.0018340109,0.00028447338,0.000006409715,0.0029877715,0.014020816],"genre_scores_gemma":[0.9886583,0.0009664013,0.006019851,0.00015622226,0.00016470587,0.00060419005,0.000027783151,0.00007903239,0.003323499],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877846,0.000026138057,0.00027497858,0.00031355332,0.00018149213,0.0004253715],"domain_scores_gemma":[0.99950796,0.000100064826,0.000026418316,0.0002465712,0.000019821953,0.00009913737],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020858803,0.00022036054,0.00020104664,0.0006119965,0.00009946545,0.00008024105,0.00019522365,0.00007501343,0.000010286011],"category_scores_gemma":[0.000051134186,0.00025380225,0.000027788516,0.0009147973,0.000020836005,0.00021120967,0.00016106482,0.000063354404,0.000007489506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041291087,0.0000086751015,0.00026562676,0.00006912314,0.000024419212,0.0000133553285,0.00032888108,0.9682247,0.012270196,0.010911539,0.0021380037,0.0057413215],"study_design_scores_gemma":[0.00029602874,0.000013619532,0.0020266399,0.00008222965,0.000022490798,0.000002164317,0.0007018268,0.6043349,0.02403831,0.00014079183,0.3680037,0.00033729544],"about_ca_topic_score_codex":0.0020264958,"about_ca_topic_score_gemma":0.003049091,"teacher_disagreement_score":0.3658657,"about_ca_system_score_codex":0.000096557655,"about_ca_system_score_gemma":0.000009952042,"threshold_uncertainty_score":0.9999914},"labels":[],"label_agreement":null},{"id":"W4317726571","doi":"10.3390/en16031182","title":"Heuristic Retailer’s Day-Ahead Pricing Based on Online-Learning of Prosumer’s Optimal Energy Management Model","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Prosumer; Demand response; Dynamic pricing; Heuristic; Computer science; Smart grid; Distributed generation; Key (lock); Business; Electricity; Marketing; Renewable energy; Computer security; Artificial intelligence","score_opus":0.01338292522863075,"score_gpt":0.21631928366550046,"score_spread":0.20293635843686972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317726571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80674666,0.0002589521,0.14787778,0.00018179734,0.0013034012,0.0002883596,0.00002683696,0.004009984,0.039306235],"genre_scores_gemma":[0.98834425,0.00025328822,0.0069707613,0.000054537843,0.00011003193,0.000094457166,0.00013025625,0.00011459946,0.0039278055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826825,0.00004981317,0.0003959972,0.0003532456,0.00045828795,0.00047440192],"domain_scores_gemma":[0.99925286,0.000100418736,0.00006823872,0.0004731469,0.000035929646,0.000069388596],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024511205,0.00030526155,0.00030581353,0.00055074866,0.000085425985,0.000034104036,0.00030266066,0.00007408793,0.000025599222],"category_scores_gemma":[0.00003407766,0.00031916675,0.00010868861,0.0006439319,0.00004161039,0.00009572372,0.00016163781,0.00016710018,0.000024550209],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015398951,0.000039016977,0.00013129147,0.00023301381,0.000093457624,0.00003655418,0.00010358504,0.9839243,0.00044894184,0.0069283377,0.0041244845,0.0039215703],"study_design_scores_gemma":[0.00035695932,0.00004835326,0.001610687,0.00014216777,0.00004928024,3.3411007e-7,0.00014566781,0.9828797,0.0033680308,0.00006084969,0.011039374,0.00029859424],"about_ca_topic_score_codex":0.000022775324,"about_ca_topic_score_gemma":0.000007931239,"teacher_disagreement_score":0.1815976,"about_ca_system_score_codex":0.00010681889,"about_ca_system_score_gemma":0.000011945555,"threshold_uncertainty_score":0.99992603},"labels":[],"label_agreement":null},{"id":"W4317884076","doi":"10.1016/j.apenergy.2023.120690","title":"Corrigendum to “Online distributed optimization for spatio-temporally constrained real-time peer-to-peer energy trading” [Appl. Energy 331 (2023) 120216]","year":2023,"lang":"en","type":"erratum","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Peer-to-peer; Computer science; Energy (signal processing); Distributed computing; Physics","score_opus":0.014318383358867913,"score_gpt":0.21754290095975423,"score_spread":0.2032245176008863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317884076","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002284938,0.00011003828,0.8672795,0.0013594923,0.04043913,0.00082375866,0.0057075364,0.0038819353,0.080375746],"genre_scores_gemma":[0.0045996127,0.000839597,0.023663439,0.0013784054,0.010174835,0.005045582,0.261063,0.0018163408,0.6914192],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99265873,0.00007014605,0.0017177123,0.0019297451,0.0017119526,0.0019116972],"domain_scores_gemma":[0.9961297,0.00018380987,0.00039062384,0.0016294918,0.00070243014,0.0009639343],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.00045664696,0.0018244319,0.0018406091,0.0014004128,0.00030163626,0.0003143375,0.0014308813,0.0013967651,0.00073524204],"category_scores_gemma":[0.00015989655,0.0021798615,0.00047478577,0.0023404208,0.00009817008,0.0001441754,0.00045757747,0.00048086778,0.00010352524],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006086999,0.00007162404,2.746393e-7,0.000091369075,0.00043663953,0.000028912029,0.000028747565,0.4684814,0.00032476295,0.011233204,0.51635826,0.0028839626],"study_design_scores_gemma":[0.00071622746,0.00012867748,0.000007891837,0.00010306044,0.00019118894,0.0000034797495,0.00004789454,0.35318777,0.0004375028,0.00029095224,0.6434222,0.0014631839],"about_ca_topic_score_codex":0.0018913633,"about_ca_topic_score_gemma":0.0026126478,"teacher_disagreement_score":0.84361607,"about_ca_system_score_codex":0.0010518589,"about_ca_system_score_gemma":0.00033733624,"threshold_uncertainty_score":0.9998996},"labels":[],"label_agreement":null},{"id":"W4318015092","doi":"10.1016/j.scs.2023.104421","title":"How INVELOX can affect the perspective of renewable energy exploitation: Demand response and multilateral structure planning outlook","year":2023,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Microgrid; Renewable energy; Demand response; Solver; Mathematical optimization; Grid; Computer science; Turbine; Photovoltaic system; Electricity; Engineering; Mathematics; Electrical engineering","score_opus":0.007798513052142489,"score_gpt":0.20751819026534454,"score_spread":0.19971967721320205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318015092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99587744,0.0013089086,0.0008728614,0.000968545,0.00011672631,0.00013432017,0.000013839241,0.00015843865,0.0005489034],"genre_scores_gemma":[0.9882448,0.00030282862,0.00011940563,0.00007774833,0.00007400915,0.000028607541,0.00000795281,0.000024219848,0.011120427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9992752,0.00005177059,0.000090504174,0.00015890428,0.0001209638,0.00030264613],"domain_scores_gemma":[0.99956447,0.0001505188,0.000026849899,0.00013474071,0.00008079052,0.00004261212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002455443,0.00014152935,0.00015459911,0.000055472414,0.00026058208,0.00011688436,0.000070052396,0.000065761255,0.0000036712038],"category_scores_gemma":[0.00004209147,0.00011373412,0.000048789523,0.00022448367,0.00013219945,0.00014904857,0.00010488811,0.00008043858,3.1809147e-8],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009280787,0.000004461501,0.0020858997,0.0007424472,0.0004073257,0.00004425411,0.13209246,0.7990621,0.0009423801,0.014729565,0.049668882,0.00012743611],"study_design_scores_gemma":[0.0006304795,0.000079249934,0.018517237,0.000044003755,0.00004255095,0.000004768948,0.88188434,0.0768089,0.002019836,0.007993329,0.01169448,0.00028085022],"about_ca_topic_score_codex":0.0007402227,"about_ca_topic_score_gemma":0.00006013357,"teacher_disagreement_score":0.74979186,"about_ca_system_score_codex":0.00012665434,"about_ca_system_score_gemma":0.000025739648,"threshold_uncertainty_score":0.46379426},"labels":[],"label_agreement":null},{"id":"W4318261551","doi":"10.1016/b978-0-323-95108-1.00004-5","title":"Effects of an hourly tariff on the electricity power sector—the Honduran model","year":2023,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Tariff; Electricity; Consumption (sociology); Environmental economics; Electricity demand; Business; Economics; Outcome (game theory); Electricity generation; Natural resource economics; Power (physics); Operations management; Microeconomics; Engineering; International economics; Electrical engineering","score_opus":0.011271464296109944,"score_gpt":0.18653564148105226,"score_spread":0.1752641771849423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318261551","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032650596,0.00023234233,0.00014974782,0.00005907416,0.001015446,0.0009422737,0.000025187508,0.0004835374,0.99382734],"genre_scores_gemma":[0.099328704,0.00011043681,0.000048594946,0.0004456947,0.00039419407,0.00018286097,0.000018316417,0.00042100696,0.8990502],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99827087,0.000046814566,0.00037100134,0.0003650663,0.0005448201,0.0004014141],"domain_scores_gemma":[0.998398,0.0003099381,0.00011584527,0.001046889,0.000046768342,0.00008254272],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032756198,0.00054562796,0.0004718041,0.00019823201,0.00011077492,0.000044531585,0.0007335743,0.0002759776,0.000041575207],"category_scores_gemma":[0.000025344058,0.0003576882,0.00026809424,0.000048306414,0.00008745502,0.000035275272,0.00011301603,0.00081304676,0.00013317476],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007921245,0.000056603243,0.0000016005577,0.0010002067,0.0024065666,0.00015635113,0.0015440385,0.25633428,0.001871028,0.23121557,0.012805836,0.49252874],"study_design_scores_gemma":[0.0010536716,0.00059900526,0.00038658959,0.0012716163,0.0009112029,0.000009381375,0.0000193314,0.17111291,0.008806294,0.03668311,0.7767359,0.002410995],"about_ca_topic_score_codex":0.0000031721231,"about_ca_topic_score_gemma":0.000058585923,"teacher_disagreement_score":0.7639301,"about_ca_system_score_codex":0.00013829328,"about_ca_system_score_gemma":0.00003165552,"threshold_uncertainty_score":0.9998875},"labels":[],"label_agreement":null},{"id":"W4318677213","doi":"10.1016/j.rser.2023.113161","title":"Energy management in microgrids using transactive energy control concept under high penetration of Renewables; A survey and case study","year":2023,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"","keywords":"Prosumer; Computer science; Renewable energy; TEC; Distributed computing; Energy management; Risk analysis (engineering); Distributed generation; Environmental economics; Process management; Systems engineering; Engineering; Energy (signal processing); Business; Economics","score_opus":0.01870397060326441,"score_gpt":0.24357003894152957,"score_spread":0.22486606833826517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318677213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.731417,0.050346926,0.2144196,0.00005179902,0.00047116354,0.0013133249,0.00003221693,0.0003442766,0.0016037091],"genre_scores_gemma":[0.96675813,0.029714013,0.00018598858,0.00007622538,0.00005579512,0.0002782239,0.000055962897,0.00007562347,0.002800063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996932,0.0005345205,0.0009015568,0.00059777265,0.00023909572,0.0007950033],"domain_scores_gemma":[0.9989771,0.00015627993,0.00014746853,0.00046791174,0.00010191337,0.00014928576],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012715381,0.00046865185,0.00095780403,0.0006935079,0.00016919564,0.0000816882,0.00016677017,0.00013720823,0.000016897948],"category_scores_gemma":[0.000014712459,0.00046723714,0.00008321157,0.00155819,0.0000951176,0.00032077014,0.00011882094,0.00007055544,2.3800852e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057023117,0.00015972168,0.00076566177,0.000513031,0.0003974099,0.0017732244,0.00037592964,0.9742597,0.00035730068,0.003678022,0.00095400144,0.016709028],"study_design_scores_gemma":[0.020475084,0.0014873665,0.0067821383,0.0008607198,0.0015184948,0.000691609,0.06828385,0.6777793,0.006333101,0.0047405553,0.20650037,0.0045474046],"about_ca_topic_score_codex":0.113878146,"about_ca_topic_score_gemma":0.03231029,"teacher_disagreement_score":0.29648033,"about_ca_system_score_codex":0.00023897583,"about_ca_system_score_gemma":0.00004345573,"threshold_uncertainty_score":0.9997779},"labels":[],"label_agreement":null},{"id":"W4319319301","doi":"10.3390/en16031549","title":"Developing an Appropriate Energy Trading Algorithm and Techno-Economic Analysis between Peer-to-Peer within a Partly Independent Microgrid","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Prosumer; Microgrid; Profitability index; Peer-to-peer; Distributed generation; Computer science; Environmental economics; Profit (economics); Grid; Business; Distributed computing; Renewable energy; Economics; Microeconomics; Engineering","score_opus":0.017994023748854462,"score_gpt":0.23898274064992794,"score_spread":0.22098871690107347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319319301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9468902,0.000119462486,0.050026827,0.00042955583,0.0006042979,0.00009336239,0.000033215125,0.0014772625,0.00032586296],"genre_scores_gemma":[0.9748896,0.000103083126,0.023237897,0.00005811084,0.00050268066,0.00013596058,0.00022210473,0.0000990671,0.0007515084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981153,0.00003399724,0.0004335974,0.0005220922,0.0003726991,0.0005223277],"domain_scores_gemma":[0.999256,0.000049202943,0.00005749528,0.00042226946,0.000045493143,0.0001695436],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005633892,0.00033972677,0.00045314713,0.0011427825,0.00014289925,0.00021633923,0.00034780236,0.00013309414,0.000014507094],"category_scores_gemma":[0.000016995324,0.00036650695,0.00009497558,0.0011742277,0.000038613827,0.0002635285,0.00022717814,0.00014523497,0.000026918504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020652328,0.000003996295,0.0015691587,0.000017808272,0.0008721538,0.000017154816,0.00062051555,0.96115434,0.00047283914,0.001545158,0.00068269775,0.033042118],"study_design_scores_gemma":[0.00044904344,0.00005026937,0.012534837,0.000037124766,0.00047303562,0.000003954116,0.0018885578,0.8942654,0.043769933,0.0012258912,0.044142548,0.0011593843],"about_ca_topic_score_codex":0.00067394605,"about_ca_topic_score_gemma":0.0004443877,"teacher_disagreement_score":0.06688891,"about_ca_system_score_codex":0.00024386554,"about_ca_system_score_gemma":0.000026225733,"threshold_uncertainty_score":0.9998787},"labels":[],"label_agreement":null},{"id":"W4319779281","doi":"10.1016/j.ijepes.2023.109015","title":"Fairness of prosumers’ incentives in residential demand response: A practical decentralized optimization approach","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Fundação de Apoio à Pesquisa, Universidade Federal de Goiás","keywords":"News aggregator; Mathematical optimization; Shapley value; Scalability; Computer science; Flexibility (engineering); Demand response; Incentive; Linear programming; Game theory; Mathematics; Electricity; Mathematical economics; Economics; Engineering","score_opus":0.010134684127466357,"score_gpt":0.25626845795962866,"score_spread":0.2461337738321623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319779281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19152376,0.0010972741,0.80109626,0.0004510499,0.004284413,0.0001975371,0.0000055157143,0.00011763813,0.0012265585],"genre_scores_gemma":[0.99803704,0.00038737812,0.0012112223,0.000012353115,0.00017256461,0.000016474007,0.0000116914935,0.000031722855,0.00011954426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974046,0.0003200178,0.00092664966,0.00015872544,0.00091149425,0.00027854304],"domain_scores_gemma":[0.9988838,0.0002789367,0.00029337796,0.0001198101,0.00033607695,0.00008799459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000999157,0.00015761539,0.0003388707,0.000989904,0.000018019962,0.000074885094,0.00036386753,0.00010711201,0.000016134716],"category_scores_gemma":[0.00039865036,0.00014784424,0.00011631303,0.00084280095,0.000036325848,0.00035374105,0.000058009475,0.00019774592,0.0000020439727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000976812,0.00012297554,0.00085987896,0.000014670114,0.0003308379,0.00018410178,0.000142886,0.9883963,0.0017018507,0.0043445732,0.002837309,0.0000878378],"study_design_scores_gemma":[0.0019771494,0.00014800951,0.0059426497,0.00015475362,0.0000359169,0.00018100748,0.00016821755,0.98364043,0.0020726556,0.000095208256,0.005360613,0.00022335962],"about_ca_topic_score_codex":0.000058932834,"about_ca_topic_score_gemma":0.0000041987682,"teacher_disagreement_score":0.8065133,"about_ca_system_score_codex":0.00033993454,"about_ca_system_score_gemma":0.000091389025,"threshold_uncertainty_score":0.6028913},"labels":[],"label_agreement":null},{"id":"W4320011674","doi":"10.2139/ssrn.4335173","title":"Internal Energy and Time Flow Potentials","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Society of Intestinal Research","funders":"","keywords":"Flow (mathematics); Mechanics; Physics","score_opus":0.0029664950646362846,"score_gpt":0.1737546241115774,"score_spread":0.17078812904694113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320011674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57335263,0.010430439,0.36959282,0.00181006,0.0047028377,0.00019148174,0.000009236738,0.002626713,0.037283763],"genre_scores_gemma":[0.9797392,0.009954709,0.00010825609,0.000054218235,0.0007083022,0.0000062000568,0.000007846614,0.00005994575,0.009361352],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810594,0.000025527042,0.00018113045,0.00011744339,0.00017369307,0.0013962849],"domain_scores_gemma":[0.9997572,0.000018778845,0.000024711058,0.00010887867,0.000016343954,0.000074137635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005828,0.00013321555,0.0001310523,0.00020561971,0.00007595058,0.00006378666,0.00016872441,0.000043740718,0.000070364615],"category_scores_gemma":[0.000010979166,0.00012919249,0.000057875266,0.0001987106,0.000016614824,0.0001239633,0.000063206615,0.00041350437,0.00014745966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043834574,0.00003288242,0.00043825878,0.000031997657,0.0017770531,0.00013486136,0.00017275734,0.52112496,0.009912743,0.12433055,0.04981027,0.29218984],"study_design_scores_gemma":[0.0013819274,0.00026634915,0.0015013724,0.000061472,0.00010892038,0.0011449533,0.00034601803,0.70366,0.001568156,0.1787444,0.11048996,0.0007264702],"about_ca_topic_score_codex":0.000019443809,"about_ca_topic_score_gemma":0.0000902881,"teacher_disagreement_score":0.40638652,"about_ca_system_score_codex":0.0002963011,"about_ca_system_score_gemma":0.00007120481,"threshold_uncertainty_score":0.5268317},"labels":[],"label_agreement":null},{"id":"W4320030810","doi":"10.1109/mpel.2022.3222599","title":"Brainstorming for Game-Changing Ideas","year":2022,"lang":"en","type":"article","venue":"IEEE Power Electronics Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Brainstorming; Session (web analytics); Power (physics); Computer science; World Wide Web; Artificial intelligence","score_opus":0.005985899781007808,"score_gpt":0.20364988685598143,"score_spread":0.19766398707497362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320030810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51477903,0.009588951,0.40322813,0.0010479213,0.01239044,0.0017645471,0.000078136654,0.003420498,0.053702302],"genre_scores_gemma":[0.994531,0.00005796549,0.0006312949,0.0004010655,0.0002432028,0.00044920953,0.00003767728,0.00014211219,0.003506484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99830097,0.00001989261,0.00023840048,0.00027351343,0.0002745688,0.0008926669],"domain_scores_gemma":[0.999462,0.000055219833,0.00003927705,0.00034482274,0.0000281233,0.000070574],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037699757,0.00022424216,0.00019951134,0.0003127903,0.00018871846,0.00003273388,0.00030270393,0.000033374454,0.00023246165],"category_scores_gemma":[0.00001566109,0.00028233483,0.00011897382,0.00046546105,0.0000125912575,0.00010837097,0.00009812625,0.0002852723,0.00005274819],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031712447,0.00004550452,0.00002624497,0.000056708166,0.00017635645,0.000015503083,0.0004067566,0.8978276,0.018903911,0.016274752,0.06355055,0.0026843562],"study_design_scores_gemma":[0.0005997429,0.00017031415,0.000035791225,0.0000051289035,0.00002826083,0.000017820064,0.00004944572,0.11354129,0.0029843762,0.0011095038,0.88109624,0.00036207668],"about_ca_topic_score_codex":0.0000011910987,"about_ca_topic_score_gemma":0.000014335458,"teacher_disagreement_score":0.8175457,"about_ca_system_score_codex":0.00065471587,"about_ca_system_score_gemma":0.000036008812,"threshold_uncertainty_score":0.99996287},"labels":[],"label_agreement":null},{"id":"W4320713616","doi":"10.1016/j.apenergy.2023.120833","title":"Consensus and sharing based distributed coordination of home energy management systems with demand response enabled baseboard heaters","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Incentive; Transactive memory; Demand response; Smart grid; Grid; Thermostat; Computer science; Distributed computing; Distributed generation; Electricity; Environmental economics; Engineering; Microeconomics; Renewable energy; Knowledge management; Economics","score_opus":0.006395385247198011,"score_gpt":0.17368597376869022,"score_spread":0.1672905885214922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320713616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7878699,0.0001975438,0.20346041,0.00019845078,0.00052258925,0.0003549048,0.00006201465,0.0015469596,0.005787268],"genre_scores_gemma":[0.99854493,0.00005437498,0.0003223902,0.000036019726,0.000035353623,0.00029496558,0.00020214492,0.00007221088,0.00043763564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985565,0.000044291086,0.00033777548,0.000377154,0.0002893761,0.00039493162],"domain_scores_gemma":[0.99923116,0.00014264208,0.0000660196,0.0004173936,0.000035159068,0.00010760919],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035117025,0.00027286448,0.00032566287,0.00043302277,0.000074610696,0.00005242045,0.00016154052,0.00007763579,0.0000074859436],"category_scores_gemma":[0.0000042388956,0.0002680209,0.00003226393,0.0007291085,0.00006270298,0.000038070277,0.000106779335,0.000050522005,0.0000033183899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041430333,0.000017580145,0.00020003886,0.00023492005,0.00024185971,0.00006678697,0.000019345056,0.96738815,0.0039770748,0.024363453,0.002707151,0.000369332],"study_design_scores_gemma":[0.0032485486,0.00011166167,0.0067723575,0.0001625177,0.00014200502,0.0000062919594,0.00031993978,0.9474531,0.01633461,0.00016905385,0.024632052,0.0006478664],"about_ca_topic_score_codex":0.0001575125,"about_ca_topic_score_gemma":0.000027470023,"teacher_disagreement_score":0.21067505,"about_ca_system_score_codex":0.00012708745,"about_ca_system_score_gemma":0.00001010407,"threshold_uncertainty_score":0.9999772},"labels":[],"label_agreement":null},{"id":"W4321613871","doi":"10.1080/15325008.2023.2179688","title":"Smart Home Appliances’ Scheduling by Two-Stage Optimization with Real-Time Price Model","year":2023,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Electricity; Electricity pricing; Operations research; Demand response; Dual (grammatical number); Smart grid; Mathematical optimization; Dynamic pricing; Real-time computing; Electricity market; Engineering; Operations management; Economics; Electrical engineering; Microeconomics","score_opus":0.009930231895792337,"score_gpt":0.19755527099753742,"score_spread":0.18762503910174508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321613871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6546113,0.000679636,0.33299527,0.000025885407,0.00046418942,0.0005200582,0.0000143139105,0.0012091439,0.009480208],"genre_scores_gemma":[0.99547213,0.00040696538,0.0010040415,0.00001207821,0.00005752214,0.00009429797,0.000089829125,0.000075029835,0.0027881318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986637,0.00002884968,0.00026210624,0.00029734275,0.00031123817,0.00043674238],"domain_scores_gemma":[0.9995293,0.000030585463,0.000058499212,0.00024246762,0.00003110027,0.000108046384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023565815,0.00022661201,0.0002699527,0.00020913736,0.000106361724,0.0001160171,0.00014703194,0.00005492692,0.000006647452],"category_scores_gemma":[0.0000027683961,0.00020799685,0.000023930426,0.0006940248,0.000011591025,0.00015753339,0.000038690232,0.00010822477,0.00006364499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012549992,0.000011430035,0.00023377527,0.00006935653,0.000078846,0.000008056135,0.000046775127,0.98469365,0.012880666,0.000264657,0.0016689365,0.000031324922],"study_design_scores_gemma":[0.0005595617,0.0000314709,0.00019804147,0.000046837642,0.0000139711265,0.0000044610138,0.000023272381,0.99701685,0.00010695713,0.0000035326173,0.0017214578,0.00027356335],"about_ca_topic_score_codex":0.00009578134,"about_ca_topic_score_gemma":7.334623e-7,"teacher_disagreement_score":0.3408608,"about_ca_system_score_codex":0.000100357094,"about_ca_system_score_gemma":0.000009967053,"threshold_uncertainty_score":0.84818655},"labels":[],"label_agreement":null},{"id":"W4321634156","doi":"10.56979/401/2022/77","title":"Prediction of Electric Power Demand of HVACs for Operating Rooms in Case of Dynamic Set Points of Temperature: A Case Study","year":2022,"lang":"en","type":"article","venue":"Journal of Computing & Biomedical Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Artificial neural network; Electric power; Set (abstract data type); Power consumption; Power (physics); Recurrent neural network; Power demand; Electric power system; Artificial intelligence; Machine learning; Industrial engineering; Engineering","score_opus":0.010070007109399478,"score_gpt":0.24844708885609398,"score_spread":0.2383770817466945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321634156","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97938126,0.0000763885,0.019763356,0.00001648396,0.00042587423,0.00027702245,0.00003495046,0.000010714334,0.000013927047],"genre_scores_gemma":[0.99382466,0.0000072416215,0.0060975705,0.000014289964,0.000031033433,0.0000027718106,0.000006997798,0.000014395179,0.0000010328185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99694425,0.000073619434,0.0022401086,0.000050610284,0.0005062145,0.00018517645],"domain_scores_gemma":[0.9985185,0.00022567093,0.0008456495,0.0001538787,0.00018776207,0.00006853288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002005214,0.00013276644,0.0005247428,0.00071212155,0.000052131258,0.000008834944,0.0001936997,0.000059460257,0.0000076099122],"category_scores_gemma":[0.0001797562,0.00012048446,0.000107556756,0.00074785843,0.00003925666,0.0001338399,0.00013491263,0.000350705,4.1934662e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005706685,0.00060588843,0.0018007848,0.0013204328,0.00043422688,0.0006740288,0.017321898,0.9719852,0.003059886,0.00001411375,0.0005991601,0.0021272684],"study_design_scores_gemma":[0.0021035748,0.00184225,0.0009019257,0.0001975473,0.000090196125,0.0042652157,0.013211828,0.9764974,0.0007480734,0.000008255659,0.000045418827,0.000088329245],"about_ca_topic_score_codex":0.00002196141,"about_ca_topic_score_gemma":0.0000059376557,"teacher_disagreement_score":0.0144433845,"about_ca_system_score_codex":0.00013753254,"about_ca_system_score_gemma":0.000073733994,"threshold_uncertainty_score":0.49132138},"labels":[],"label_agreement":null},{"id":"W4322502377","doi":"10.3390/en16052251","title":"The Impact of Battery Storage on Power Flow and Economy in an Automated Transactive Energy Market","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prosumer; Battery (electricity); Energy storage; Energy market; Grid; Energy flow; Computer science; Environmental economics; Energy (signal processing); Power (physics); Control (management); Smart grid; Flow battery; Electricity; Reliability engineering; Economics; Engineering; Electrical engineering; Renewable energy","score_opus":0.005368360548913925,"score_gpt":0.221676151071919,"score_spread":0.21630779052300506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322502377","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9884805,0.000084129744,0.00014186096,0.000039086055,0.00020750886,0.00003876472,0.000009519256,0.00050294766,0.010495653],"genre_scores_gemma":[0.9995234,0.00013845357,0.00002749561,0.0000127912435,0.000021779839,0.000031619966,0.000008563821,0.000030289551,0.00020558787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994007,0.00004634388,0.00014637351,0.0001314818,0.000064034284,0.00021110037],"domain_scores_gemma":[0.99958295,0.0001345061,0.000017678964,0.00022016806,0.000009274762,0.000035406836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013967529,0.00013865552,0.00014272291,0.00018486351,0.000034156146,0.00003460942,0.00011510925,0.00004054262,0.000049402443],"category_scores_gemma":[0.0000051997254,0.00010547565,0.000043522574,0.00020729941,0.000036314646,0.00014729961,0.000019886951,0.000056122717,0.0000030182287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002557826,0.000010051697,0.00023314785,0.000007380235,0.0000749756,0.000010383913,0.00030809798,0.9895129,0.00021719746,0.00020442347,0.0077385446,0.0016572693],"study_design_scores_gemma":[0.00025813302,0.00008090756,0.09095043,0.000016587743,0.0000043299333,5.146909e-7,0.00023122615,0.9034356,0.0014275382,0.00010038501,0.0033540188,0.00014033612],"about_ca_topic_score_codex":0.00010050237,"about_ca_topic_score_gemma":0.000112196576,"teacher_disagreement_score":0.090717286,"about_ca_system_score_codex":0.000074597796,"about_ca_system_score_gemma":0.000008544756,"threshold_uncertainty_score":0.43011722},"labels":[],"label_agreement":null},{"id":"W4322714933","doi":"10.5281/zenodo.7683252","title":"Data-Driven Distributionally Robust Chance-Constrained Unit Commitment With Uncertain Wind Power","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Power system simulation; Wind power; Mathematical optimization; Robust optimization; Unit (ring theory); Power (physics); Computer science; Wind power forecasting; Economics; Operations research; Control theory (sociology); Mathematics; Electric power system; Engineering; Artificial intelligence; Electrical engineering; Physics; Control (management)","score_opus":0.03962861250842843,"score_gpt":0.22163923328114443,"score_spread":0.18201062077271601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322714933","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31362632,0.0001742117,0.09847973,0.002109189,0.00091917353,0.002586305,0.0050856713,0.00578098,0.5712384],"genre_scores_gemma":[0.9857371,0.000033313794,0.0007724176,0.00008072999,0.00009828438,7.456056e-8,0.011416062,0.00098728,0.0008747467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99860185,0.0000903382,0.00018978668,0.00036958852,0.00038353392,0.000364908],"domain_scores_gemma":[0.99876076,0.000014941589,0.000044419612,0.0008529415,0.00019738499,0.00012956816],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00031487824,0.00017451805,0.00014611999,0.00012761325,0.0004806599,0.0003260574,0.0011413376,0.000042946074,0.011342469],"category_scores_gemma":[0.000048999307,0.00017210063,0.000022269636,0.0004252408,0.000095788484,0.00029349048,0.00092024216,0.00020449825,0.0049243155],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009823993,0.00017344681,0.00010124733,0.00014364037,0.00042130778,0.00004764508,0.00035962198,0.7851094,0.0012522895,0.01447948,0.18949464,0.008319056],"study_design_scores_gemma":[0.00072647596,0.00016216187,0.0026530144,0.00004308356,0.000017508459,0.000033833225,0.00021196512,0.03867742,0.00007433631,0.000016044873,0.95714,0.0002441125],"about_ca_topic_score_codex":0.0000063788502,"about_ca_topic_score_gemma":9.014102e-7,"teacher_disagreement_score":0.7676454,"about_ca_system_score_codex":0.00019105282,"about_ca_system_score_gemma":0.0000040422624,"threshold_uncertainty_score":0.99585044},"labels":[],"label_agreement":null},{"id":"W4323048897","doi":"10.1016/s0735-1097(23)01905-8","title":"INCIDENCE OF LEFT VENTRICULAR THROMBUS FOLLOWING STEMI IN MODERN REPERFUSION NETWORKS USING MULTIMODALITY IMAGING: A SYSTEMATIC REVIEW AND META-ANALYSIS","year":2023,"lang":"en","type":"review","venue":"Journal of the American College of Cardiology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Medicine; Thrombus; Incidence (geometry); Multimodality; Cardiology; Internal medicine; Meta-analysis; Radiology; World Wide Web","score_opus":0.04338639726732663,"score_gpt":0.3089927852901797,"score_spread":0.2656063880228531,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323048897","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007455634,0.99190557,0.006206755,0.00002318585,0.00023018042,0.00083549117,0.00003199566,0.000011801543,0.000009447555],"genre_scores_gemma":[0.023508174,0.97594297,0.000406571,0.000022847713,0.000044520624,0.000015458741,0.0000017390761,0.00005003756,0.0000076886945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"meta_analysis","domain_scores_codex":[0.99477077,0.00168089,0.0025958098,0.0002506292,0.00043865707,0.00026324132],"domain_scores_gemma":[0.9954361,0.0005988337,0.0029505023,0.00081809686,0.00013819555,0.00005832117],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003215906,0.00039675125,0.01327541,0.00063919503,0.000032988195,0.000006864894,0.00069766736,0.000086553264,0.0000015121631],"category_scores_gemma":[0.00038941088,0.0002469366,0.004780109,0.0020218082,0.00013358938,0.00007509606,0.00033646938,0.0004276207,1.5392561e-7],"study_design_candidate":"meta_analysis","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025044606,0.0000061693186,0.00016169845,0.16148078,0.11083853,0.00034747305,0.00001020822,0.7268968,0.0000013392138,0.0000031841507,0.000057486603,0.00019381144],"study_design_scores_gemma":[0.0001271275,0.00003124128,0.000057703182,0.04191438,0.9027001,0.0008228349,0.00007424847,0.053601194,7.2723356e-7,0.000016986147,0.00033650038,0.00031694054],"about_ca_topic_score_codex":0.000047465666,"about_ca_topic_score_gemma":0.000010216597,"teacher_disagreement_score":0.7918616,"about_ca_system_score_codex":0.00028453115,"about_ca_system_score_gemma":0.000084671214,"threshold_uncertainty_score":0.9999983},"labels":[],"label_agreement":null},{"id":"W4323845467","doi":"10.3390/su15064891","title":"An Exploratory Study of the Perception of Peer-to-Peer Energy Trading within the Power Distribution Network in the UAE","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Smart grid; Peer-to-peer; Electricity; Environmental economics; Business; Grid; Distributed generation; Marketing; Computer science; Computer security; Economics; Engineering; Distributed computing; Renewable energy; Electrical engineering","score_opus":0.01010608386050385,"score_gpt":0.24152213434308106,"score_spread":0.2314160504825772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323845467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99650717,0.000007953731,0.0012982822,0.0009523698,0.00048606694,0.00057088915,0.00000669036,0.00008136187,0.000089217516],"genre_scores_gemma":[0.9996156,8.932462e-7,0.0000058899905,0.000030925195,0.00009535533,0.00016480316,0.000017241273,0.00001659276,0.000052710806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9981646,0.0005007837,0.00033959845,0.00019493802,0.0005421055,0.00025799],"domain_scores_gemma":[0.9985725,0.000112190784,0.00005181262,0.0008653236,0.00037118676,0.000026973281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032411362,0.00013135176,0.00015163192,0.00004891287,0.00011502841,0.000022392276,0.0004800129,0.000045180073,0.000014308879],"category_scores_gemma":[0.00045749178,0.00007643524,0.000058597565,0.0012714947,0.000073587915,0.00011426374,0.00010618469,0.00016512003,9.635851e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002028665,0.0001431061,0.0346793,0.000041581105,0.000021328133,0.0000016853664,0.029069912,0.9282558,0.000044315486,0.0019351556,0.005293661,0.00049388217],"study_design_scores_gemma":[0.00022464083,0.00015528018,0.7703602,0.000010762839,0.00002395555,2.3607045e-7,0.1804338,0.043715935,0.000057201098,0.0028124286,0.002085565,0.0001200026],"about_ca_topic_score_codex":0.00023364543,"about_ca_topic_score_gemma":0.0010680098,"teacher_disagreement_score":0.88453984,"about_ca_system_score_codex":0.0004549682,"about_ca_system_score_gemma":0.000038561993,"threshold_uncertainty_score":0.31169385},"labels":[],"label_agreement":null},{"id":"W4324373962","doi":"10.1016/j.energy.2023.127212","title":"Integration of design and control for renewable energy systems with an application to anaerobic digestion: A deep deterministic policy gradient framework","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; Consejo Nacional de Ciencia y Tecnología","keywords":"Biogas; Reinforcement learning; Anaerobic digestion; Renewable energy; Mathematical optimization; Computer science; Process (computing); Function (biology); Engineering; Mathematics; Artificial intelligence","score_opus":0.010089360253153962,"score_gpt":0.22089348457344307,"score_spread":0.2108041243202891,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324373962","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046965773,0.00008047137,0.99439186,0.000054453252,0.00017343616,0.00023536246,0.0000052338355,0.00026441136,0.00009816709],"genre_scores_gemma":[0.98634917,0.000049410755,0.011799935,0.000057933816,0.00025106646,0.0012510085,0.00005576847,0.000049411676,0.00013631542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991483,0.00004021975,0.000220796,0.00023254262,0.00012434226,0.00023379974],"domain_scores_gemma":[0.99934673,0.00014088448,0.000049331495,0.00029726772,0.000055420547,0.00011034154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014010837,0.00015865796,0.0002022873,0.00029311862,0.000058831898,0.000039876784,0.00011114398,0.00007211345,8.405656e-7],"category_scores_gemma":[0.000035317735,0.00014805686,0.000021175232,0.0005384769,0.000020367404,0.00008159889,0.000015617736,0.00002732733,9.986327e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052389394,0.000011823888,0.000011481605,0.000034548324,0.000038335013,0.0000013269909,0.000096495896,0.95016545,0.0026599783,0.04155703,0.00019173094,0.005179421],"study_design_scores_gemma":[0.00031480033,0.0003953898,0.00037051534,0.000066782915,0.000033076125,0.0000032566284,0.000068906666,0.9886393,0.0028983005,0.0017315804,0.005300497,0.00017761759],"about_ca_topic_score_codex":0.0014108537,"about_ca_topic_score_gemma":0.0005985832,"teacher_disagreement_score":0.9825919,"about_ca_system_score_codex":0.00009483433,"about_ca_system_score_gemma":0.000016769613,"threshold_uncertainty_score":0.60375834},"labels":[],"label_agreement":null},{"id":"W4352980647","doi":"10.1109/npsc57038.2022.10069194","title":"Decentralized Optimal Home Energy Management in Active Distribution Networks","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reliability engineering; Demand response; Computer science; Energy management; Smart grid; Renewable energy; Grid; Energy management system; Integer programming; Energy storage; Transformer; Electric power system; Electricity; Operations research; Engineering; Power (physics); Energy (signal processing); Electrical engineering","score_opus":0.003843810101794296,"score_gpt":0.17348462733891867,"score_spread":0.16964081723712437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4352980647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13859895,0.0004069856,0.82526493,0.00018819205,0.0024933254,0.0003648099,0.00003193752,0.0010172062,0.03163364],"genre_scores_gemma":[0.998,0.00028271737,0.0004739326,0.00008070383,0.000040843184,0.00029286166,0.00028760798,0.000026318085,0.0005149861],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999063,0.000036593265,0.00017211713,0.0001833998,0.00019006438,0.00035483966],"domain_scores_gemma":[0.9997309,0.000013444691,0.000014656908,0.00018860806,0.00000517695,0.000047249643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009223339,0.00013273869,0.00012011027,0.00009336791,0.00007307271,0.000018944722,0.00017723088,0.000022694785,0.0006947019],"category_scores_gemma":[8.3745635e-7,0.00015394746,0.000042760203,0.0004147416,0.000010400015,0.00008107824,0.00023455308,0.0001159211,0.000005144039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026816466,0.0000345245,0.00010487713,0.0000048287884,0.000074054355,0.000041360345,0.0000188401,0.95675135,0.0000052427063,0.023740128,0.009738976,0.0094589945],"study_design_scores_gemma":[0.000772249,0.000020084763,0.008865071,0.0000029225284,0.000015606707,0.0000021952633,0.00021390317,0.81377566,0.00012971327,0.00009696822,0.17587632,0.00022931266],"about_ca_topic_score_codex":0.00006429201,"about_ca_topic_score_gemma":0.00003569238,"teacher_disagreement_score":0.8594011,"about_ca_system_score_codex":0.00057621225,"about_ca_system_score_gemma":0.0000024366298,"threshold_uncertainty_score":0.76064986},"labels":[],"label_agreement":null},{"id":"W4360584207","doi":"10.1109/isgt51731.2023.10066398","title":"Power Management in Smart Buildings Using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Reinforcement learning; Schedule; Computer science; Markov decision process; Particle swarm optimization; Mathematical optimization; Energy storage; Energy management; Metaheuristic; Battery (electricity); Microgrid; Markov process; Power (physics); Energy (signal processing); Artificial intelligence; Machine learning; Mathematics","score_opus":0.012234279029244195,"score_gpt":0.2205747348603178,"score_spread":0.2083404558310736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4360584207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5786344,0.000032081403,0.043079983,0.0000683716,0.0010257057,0.00030413605,1.3819543e-7,0.002045027,0.37481016],"genre_scores_gemma":[0.99245065,0.00007592842,0.0021792368,0.00008858707,0.00003244687,0.000037585112,0.0000059572035,0.000050907394,0.005078675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988926,0.000010981538,0.00024834252,0.00019529437,0.00022412803,0.00042866173],"domain_scores_gemma":[0.9997134,0.000014657203,0.000015113542,0.00020455303,0.000008162068,0.00004407919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002679002,0.00015612371,0.00012528416,0.00049059873,0.000044447435,0.00003923711,0.00014258073,0.00003721988,0.00030565984],"category_scores_gemma":[0.000005878955,0.00017024211,0.000040561645,0.00079552847,0.00000992755,0.00012690887,0.00018452617,0.00012366645,0.00035325767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019345698,0.0000037826057,0.0014961271,0.000037477985,0.000051300536,0.000050312057,0.00009239927,0.9900475,0.00035856428,0.004123147,0.0029211238,0.0008163134],"study_design_scores_gemma":[0.00040045084,0.0000148041945,0.0059712445,0.000042802156,0.000009658483,0.0000012162244,0.00040751186,0.8497012,0.00062148256,0.00007069266,0.14248393,0.00027500492],"about_ca_topic_score_codex":0.000043528493,"about_ca_topic_score_gemma":0.00000860445,"teacher_disagreement_score":0.4138163,"about_ca_system_score_codex":0.00020135893,"about_ca_system_score_gemma":0.0000022532279,"threshold_uncertainty_score":0.6942272},"labels":[],"label_agreement":null},{"id":"W4361185981","doi":"10.1109/isgtmiddleeast56437.2023.10078477","title":"Density And Dynamic Time Warping Based Spatial Clustering For Appliance Operation Modes","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Cluster analysis; Dynamic time warping; DBSCAN; Silhouette; Computer science; Image warping; Data mining; Partition (number theory); Consensus clustering; Pattern recognition (psychology); Artificial intelligence; Correlation clustering; CURE data clustering algorithm; Mathematics","score_opus":0.008230991195419755,"score_gpt":0.2046610672516357,"score_spread":0.19643007605621593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361185981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1891671,0.0000064159185,0.8092833,0.00007638509,0.00011735198,0.00016918399,0.000001656038,0.00055028807,0.0006283157],"genre_scores_gemma":[0.9906885,0.0000075298226,0.008689382,0.000042800708,0.000050103634,0.00006337349,0.00003314871,0.000023503397,0.00040166234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959236,0.000003871572,0.00008344456,0.0001247558,0.00005481763,0.0001407702],"domain_scores_gemma":[0.99983907,0.000025949465,0.000005834444,0.000096012955,0.000009233161,0.000023895309],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008915536,0.000077996854,0.000075937176,0.000054762255,0.000055154367,0.000035066252,0.000040712657,0.000026054648,0.000013935866],"category_scores_gemma":[0.0000056684194,0.00008342638,0.000015633866,0.000064442036,0.0000064571773,0.00007287551,0.000035166227,0.000024296232,0.000042462198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003632183,0.0000013338097,0.000042877455,0.00006859565,0.00000917207,7.318249e-7,0.000012812395,0.9836847,0.012408964,0.000051403982,0.00036013772,0.0033556025],"study_design_scores_gemma":[0.0002112837,0.000007270836,0.0015798722,0.000011601416,0.000005753809,2.529268e-7,0.0000098756145,0.992977,0.0047028475,0.000026438438,0.00036567086,0.00010209907],"about_ca_topic_score_codex":0.000023309205,"about_ca_topic_score_gemma":0.00017704828,"teacher_disagreement_score":0.8015214,"about_ca_system_score_codex":0.00004217327,"about_ca_system_score_gemma":0.0000026198672,"threshold_uncertainty_score":0.3402029},"labels":[],"label_agreement":null},{"id":"W4361279794","doi":"10.3390/buildings13040911","title":"A Design and Comparative Analysis of a Home Energy Disaggregation System Based on a Multi-Target Learning Framework","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Walailak University","keywords":"Computer science; Machine learning; Inference; Artificial intelligence; Kernel (algebra); Data mining; Autoencoder; Electric power system; Energy consumption; Energy (signal processing); Kernel density estimation; Power (physics); Deep learning; Engineering; Statistics","score_opus":0.024443877471152158,"score_gpt":0.23702917900615664,"score_spread":0.2125853015350045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361279794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2052924,0.00006324246,0.79380184,0.00001573158,0.00009582355,0.00008100473,0.0000024422209,0.00046811628,0.00017938124],"genre_scores_gemma":[0.97583365,0.000014827579,0.023973322,0.000013568885,0.000021840315,0.00005788366,0.000022007867,0.00001766878,0.000045206023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917746,0.00006686716,0.00019435867,0.00019898992,0.00018379996,0.00017851856],"domain_scores_gemma":[0.9994059,0.0003019315,0.00006329681,0.00015536613,0.000026118036,0.000047367907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023795167,0.00014250138,0.0003095972,0.0006557217,0.00005426382,0.000028530436,0.00008426273,0.00006157811,0.000008945492],"category_scores_gemma":[0.000030020203,0.00014550373,0.00006553387,0.0016087063,0.000021712249,0.00005340602,0.000028050641,0.000090849564,0.000005251993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014614452,0.000009951796,0.0021002686,0.00005126054,0.00037883743,0.0000040734026,0.00043190242,0.9921949,0.00059247867,0.0039061843,0.00012620329,0.00018930645],"study_design_scores_gemma":[0.00020595976,0.000038919574,0.007797668,0.0001352616,0.00017501076,1.4535382e-7,0.00020685706,0.98813486,0.0024187188,0.000017271213,0.00072816946,0.00014117875],"about_ca_topic_score_codex":0.000038660044,"about_ca_topic_score_gemma":0.0000032569237,"teacher_disagreement_score":0.77054125,"about_ca_system_score_codex":0.000080650425,"about_ca_system_score_gemma":0.000004224629,"threshold_uncertainty_score":0.59334695},"labels":[],"label_agreement":null},{"id":"W4361760000","doi":"10.35682/jje.v1i1.59","title":"Distributed Energy Resources Electrical Systems: Current status and Future prospective","year":2022,"lang":"en","type":"article","venue":"Jordan Journal of Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distributed generation; Environmental economics; Payback period; Electricity; Reliability engineering; Investment (military); Electricity generation; Computer science; Reliability (semiconductor); Electric power system; Business; Automotive engineering; Risk analysis (engineering); Power (physics); Production (economics); Engineering; Economics; Electrical engineering; Renewable energy; Microeconomics","score_opus":0.004090440278603382,"score_gpt":0.18557920608553732,"score_spread":0.18148876580693393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361760000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71846014,0.20097934,0.05408221,0.00071845955,0.019016787,0.0002402934,0.00014980987,0.0004853293,0.005867596],"genre_scores_gemma":[0.99447197,0.0032902828,0.000083173814,0.000030466117,0.001930288,0.00003391547,0.00001764587,0.00004644521,0.00009579074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983254,0.00013221605,0.0004817299,0.00016494904,0.0005099066,0.00038579982],"domain_scores_gemma":[0.999318,0.00004886679,0.00018688019,0.00016801035,0.00006824824,0.00020999607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019959871,0.00020850186,0.00033472772,0.00031294933,0.00015318522,0.000070723305,0.00022659206,0.000035747235,0.000031475287],"category_scores_gemma":[0.00001422099,0.00019181187,0.000096633674,0.00050725136,0.000026302549,0.00012887637,0.00011935067,0.00035409964,2.9235073e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001908077,0.0001856905,0.0028843733,0.000053109216,0.0005986162,0.00023451236,0.00033029195,0.85734123,0.00021559159,0.075911246,0.04035224,0.0217023],"study_design_scores_gemma":[0.0006411708,0.00029769496,0.0036954703,0.000017012228,0.000053374497,0.00016354996,0.00035891472,0.016296655,0.00013144247,0.00041851314,0.97770196,0.00022421607],"about_ca_topic_score_codex":0.00003579357,"about_ca_topic_score_gemma":0.000009823924,"teacher_disagreement_score":0.93734974,"about_ca_system_score_codex":0.0004976972,"about_ca_system_score_gemma":0.00003803413,"threshold_uncertainty_score":0.7821861},"labels":[],"label_agreement":null},{"id":"W4361828607","doi":"10.1109/tpec56611.2023.10078524","title":"Bi-Level Transactive Coordination of Energy Management Systems in a Community","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Energy consumption; Computer science; Demand response; Energy management; Consumption (sociology); Grid; Work (physics); Load management; Energy (signal processing); Distributed computing; Knowledge management; Electricity; Engineering","score_opus":0.02500103124293517,"score_gpt":0.2156979560428705,"score_spread":0.19069692479993533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361828607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44633472,0.00013388779,0.33907422,0.0001408068,0.0014310565,0.00047010987,0.000022806571,0.0013883888,0.21100399],"genre_scores_gemma":[0.9979745,0.00007892007,0.00015411086,0.000009061722,0.000010654669,0.000088216715,0.000021156064,0.000019431782,0.0016439073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993722,0.00006241442,0.00020256711,0.00007047856,0.00013917932,0.00015320601],"domain_scores_gemma":[0.9996764,0.00004929494,0.000015972133,0.000220993,0.000016445623,0.00002089611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026953357,0.00009150491,0.00013421428,0.00039099986,0.00002273569,0.00000915605,0.00014653316,0.000033699685,0.000015266874],"category_scores_gemma":[0.0000024158717,0.000096692434,0.00002705868,0.0006859833,0.000012130995,0.00007483187,0.000034765206,0.00007381497,0.000014212898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000420109,0.00003789414,0.00017388101,0.00027287295,0.000101146805,0.0000072450916,0.00027101542,0.9674557,0.00033781465,0.024181366,0.0027604953,0.00439641],"study_design_scores_gemma":[0.0010294591,0.000044290915,0.07509168,0.0001468222,0.000027130209,8.320595e-7,0.0032994284,0.9061952,0.003737251,0.00041608035,0.009713456,0.0002983516],"about_ca_topic_score_codex":0.0013843515,"about_ca_topic_score_gemma":0.0005561986,"teacher_disagreement_score":0.5516398,"about_ca_system_score_codex":0.000100030724,"about_ca_system_score_gemma":0.000001839056,"threshold_uncertainty_score":0.3943003},"labels":[],"label_agreement":null},{"id":"W4362446409","doi":"10.1016/j.apenergy.2023.121020","title":"Geographic-information-based stochastic optimization model for multi-microgrid planning","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Universidade Federal do ABC","keywords":"Microgrid; Geographic information system; Grid; Computer science; Monte Carlo method; Renewable energy; Stochastic modelling; Energy planning; Stochastic programming; Context (archaeology); Mathematical optimization; Operations research; Engineering; Control (management); Geography; Artificial intelligence; Mathematics; Cartography","score_opus":0.017778595694907504,"score_gpt":0.21807002750863272,"score_spread":0.20029143181372522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362446409","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008149247,0.00002335741,0.9965294,0.000020745776,0.00029484145,0.0001641199,0.000019184748,0.0014147129,0.00071872823],"genre_scores_gemma":[0.91723615,0.000020429972,0.07958899,0.00031658262,0.00012364239,0.00120634,0.0013285936,0.00009066284,0.000088612804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991316,0.0000027845244,0.00023895389,0.00014609916,0.00013938476,0.00034114227],"domain_scores_gemma":[0.99960697,0.00004841945,0.000036314428,0.0002137363,0.00003173604,0.00006285187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000086136155,0.00018133885,0.00013596166,0.00038571874,0.00010075536,0.000051528794,0.00015271339,0.00007926918,0.0000070863043],"category_scores_gemma":[0.0000076059705,0.00020737544,0.00005871119,0.00040909796,0.000016778673,0.00013111488,0.00003130666,0.00005078781,0.00002121852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010067035,0.000008065516,0.0000036075364,0.00003655053,0.000038414528,3.1456065e-7,0.000066121145,0.99129856,0.00008434051,0.00469298,0.002585978,0.001174985],"study_design_scores_gemma":[0.0007242772,0.0000072546036,0.00001953208,0.000009990648,0.000019368648,1.2613391e-7,0.000035889283,0.9955706,0.00029538712,0.00008668095,0.0029994482,0.00023142574],"about_ca_topic_score_codex":0.000011459958,"about_ca_topic_score_gemma":0.000004881997,"teacher_disagreement_score":0.9169404,"about_ca_system_score_codex":0.000047396297,"about_ca_system_score_gemma":0.000012989335,"threshold_uncertainty_score":0.8456525},"labels":[],"label_agreement":null},{"id":"W4362559193","doi":"10.3390/su15076165","title":"Novel Decentralized Peer-to-Peer Gas and Electricity Transaction Market between Prosumers and Retailers Considering Integrated Demand Response Programs","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Demand response; Electricity; Peer-to-peer; Database transaction; Distributed generation; Computer science; Environmental economics; Business; Distributed computing; Renewable energy; Economics; Electrical engineering; Engineering","score_opus":0.013214672831937647,"score_gpt":0.24028177145567522,"score_spread":0.22706709862373758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362559193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9761364,0.000043472366,0.018733852,0.0027536398,0.000125156,0.0012654357,0.000014617502,0.00084484485,0.0000826052],"genre_scores_gemma":[0.99805945,0.000031926873,0.0009306797,0.000018569359,0.000021762235,0.00017106516,0.000027829023,0.000048582573,0.00069013506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9979672,0.00017520325,0.000339244,0.0004803281,0.00036508928,0.00067292794],"domain_scores_gemma":[0.99875313,0.00026241786,0.000031232903,0.0003008186,0.00040645406,0.00024597393],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00250602,0.00028302614,0.00032293252,0.00028174973,0.00013778525,0.00012473763,0.00009922972,0.00012768152,0.000025577348],"category_scores_gemma":[0.0014408706,0.0002912634,0.000052431024,0.0010479823,0.00012806135,0.00019244498,0.000055857112,0.00025464952,0.0000023814193],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00611083,0.00026598058,0.6279583,0.004121608,0.0012568642,0.00017230996,0.009440469,0.103481755,0.009368729,0.0002865729,0.016212523,0.22132409],"study_design_scores_gemma":[0.0024291934,0.00029192353,0.8368329,0.00006456971,0.00018404175,0.000014301324,0.0031155555,0.074694924,0.0035830801,0.0008992316,0.07699304,0.0008972523],"about_ca_topic_score_codex":0.0001765406,"about_ca_topic_score_gemma":0.00010292678,"teacher_disagreement_score":0.22042683,"about_ca_system_score_codex":0.0007773772,"about_ca_system_score_gemma":0.000087762215,"threshold_uncertainty_score":0.9999539},"labels":[],"label_agreement":null},{"id":"W4362653285","doi":"10.1109/ojia.2023.3264651","title":"A Stochastic Approach to Integrating Electrical Thermal Storage in Distributed Demand Response for Nordic Communities With Wind Power Generation","year":2023,"lang":"en","type":"article","venue":"IEEE Open Journal of Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Flexibility (engineering); Distributed generation; Computer science; Thermal energy storage; Wind power; Peak demand; Grid; Energy storage; Renewable energy; Distributed data store; Smart grid; Distributed computing; Power (physics); Engineering; Electrical engineering; Electricity; Economics","score_opus":0.036758206030510186,"score_gpt":0.2752949790305711,"score_spread":0.2385367730000609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362653285","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52703327,0.000009426617,0.47198227,0.00016754284,0.00004402285,0.00056686514,0.000019838018,0.000023777873,0.00015297708],"genre_scores_gemma":[0.99578494,0.0000012176105,0.0033839748,0.000042547545,0.00014395326,0.0005103557,0.000040940453,0.000032571923,0.000059503436],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999048,0.000093205956,0.0003721042,0.00010127622,0.00016226839,0.00022317756],"domain_scores_gemma":[0.99925077,0.00019867954,0.000096995005,0.00023826337,0.00011661739,0.000098683675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087724044,0.00013674166,0.00020823695,0.00029598447,0.00013868291,0.00013812038,0.0005001715,0.00011223914,0.0000068976906],"category_scores_gemma":[0.0000417188,0.00012014751,0.00003135286,0.00095886877,0.000024271518,0.00021326443,0.000048957554,0.0005540539,0.000003545816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015158793,0.00005986486,0.00010126472,0.000005367571,0.000054909295,0.0000026224973,0.00065618387,0.9909613,0.0047445316,0.00021540566,0.0027974201,0.00024951494],"study_design_scores_gemma":[0.0028567016,0.00065893884,0.030387953,0.00021829798,0.000108093685,0.00010221502,0.006055079,0.9508017,0.0017640026,0.000080566,0.0063081356,0.00065834756],"about_ca_topic_score_codex":0.000016704525,"about_ca_topic_score_gemma":0.000024389927,"teacher_disagreement_score":0.46875164,"about_ca_system_score_codex":0.00019693417,"about_ca_system_score_gemma":0.0000817965,"threshold_uncertainty_score":0.48994732},"labels":[],"label_agreement":null},{"id":"W4365445460","doi":"10.1016/j.ijepes.2023.109111","title":"Blockchain and cooperative game theory for peer-to-peer energy trading in smart grids","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Blockchain; Computer science; Smart grid; Incentive; Peer-to-peer; Renewable energy; Robustness (evolution); Game theory; Demand response; Scheme (mathematics); Distributed computing; Environmental economics; Computer security; Microeconomics; Engineering; Electricity; Economics","score_opus":0.009628925526890467,"score_gpt":0.24024630406076078,"score_spread":0.23061737853387032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365445460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34090856,0.0034729377,0.6145975,0.005755541,0.021965835,0.00045068873,0.00006517172,0.00044956882,0.012334173],"genre_scores_gemma":[0.9954312,0.00007737215,0.00009370013,0.00022199165,0.0008080787,0.000055558856,0.00001193284,0.000053596887,0.0032466117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977814,0.000107418186,0.00069927087,0.00020750923,0.0008312671,0.00037313811],"domain_scores_gemma":[0.99857855,0.00045891464,0.00010957716,0.00010879888,0.0005738953,0.00017026415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010864626,0.0002209969,0.00036624717,0.0010825003,0.000030401136,0.00012217487,0.0004050076,0.00009952142,0.000012420926],"category_scores_gemma":[0.0003402934,0.00020287257,0.00011409148,0.0005878884,0.000022247501,0.000118453,0.00005269826,0.00014928781,0.0000036177494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022685557,0.000065468,0.000228628,0.000011279028,0.0006835266,0.00024066004,0.0004993963,0.7849054,0.0030779322,0.15969965,0.04646994,0.0038912832],"study_design_scores_gemma":[0.0018020461,0.00045716233,0.0008851036,0.0001893571,0.000034474353,0.00021972686,0.00023344356,0.58783805,0.002965775,0.0021472261,0.40275285,0.00047479122],"about_ca_topic_score_codex":0.00007512514,"about_ca_topic_score_gemma":0.00003536662,"teacher_disagreement_score":0.6545226,"about_ca_system_score_codex":0.00037297903,"about_ca_system_score_gemma":0.000039291393,"threshold_uncertainty_score":0.82729036},"labels":[],"label_agreement":null},{"id":"W4365794531","doi":"10.2139/ssrn.4417808","title":"A Novel Non-Intrusive Framework for Real-Time Disaggregation of Behind-the-Meter Solar Generation from Smart Meter Data","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Metre; Smart meter; Computer science; Environmental science; Real-time computing; Remote sensing; Electrical engineering; Engineering; Geography; Smart grid; Physics; Astronomy","score_opus":0.036119438641429163,"score_gpt":0.264437539533279,"score_spread":0.2283181008918498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365794531","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046659574,0.0005619335,0.94810677,0.000660654,0.0028174461,0.0006224466,0.00038087615,0.00013698968,0.000053332213],"genre_scores_gemma":[0.7700821,0.021810142,0.17230278,0.00019772876,0.01924708,0.00074769685,0.012020852,0.001070737,0.0025208718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967732,0.00006947117,0.00075770786,0.0005542481,0.0004773038,0.0013680723],"domain_scores_gemma":[0.9976839,0.00028518852,0.00043300042,0.0013977884,0.00013148971,0.00006866812],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0019055225,0.00042436033,0.00050697103,0.00021667006,0.00015857184,0.00017325656,0.0013302949,0.0003801465,0.000031262705],"category_scores_gemma":[0.0001943717,0.0003747175,0.0002595102,0.00013539071,0.000039955776,0.0002543231,0.0007106369,0.0023642613,0.000033369575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016876955,0.00015376735,0.00029279676,0.00021614169,0.0108658075,0.0000060173456,0.0012758955,0.8951693,0.040010083,0.019268055,0.015101067,0.01747228],"study_design_scores_gemma":[0.0008842422,0.00014554487,0.0007596001,0.00036433822,0.001111291,0.000017757018,0.00020304885,0.80252105,0.0041019656,0.18754876,0.001592813,0.00074957253],"about_ca_topic_score_codex":0.0005004892,"about_ca_topic_score_gemma":0.0017767245,"teacher_disagreement_score":0.775804,"about_ca_system_score_codex":0.0009678963,"about_ca_system_score_gemma":0.00048884796,"threshold_uncertainty_score":0.9999373},"labels":[],"label_agreement":null},{"id":"W4366332543","doi":"10.11113/jurnalteknologi.v85.18684","title":"IMPACT AND EVALUATION OF OPTIMIZED PV GENERATION IN THE DISTRIBUTION SYSTEM WITH VARYING LOAD DEMANDS","year":2023,"lang":"en","type":"article","venue":"Jurnal Teknologi","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institut interdisciplinaire d'innovation technologique; Université de Sherbrooke","funders":"Universiti Teknologi Malaysia","keywords":"Dispatchable generation; Photovoltaic system; Renewable energy; Automotive engineering; Particle swarm optimization; Reduction (mathematics); Voltage; Electricity generation; Power (physics); Electric power system; Reliability engineering; Distributed generation; Computer science; Engineering; Mathematical optimization; Electrical engineering; Mathematics","score_opus":0.033762184699647764,"score_gpt":0.26854971020924595,"score_spread":0.2347875255095982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366332543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893306,0.00017233645,0.009527927,0.000049775303,0.000100647725,0.00018119885,0.000004521098,0.000104351806,0.00052866194],"genre_scores_gemma":[0.9996624,0.00006125435,0.0001033483,0.0000028030404,0.00006150983,0.00004524452,0.000053592747,0.0000072013418,0.0000026405335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992245,0.00008542018,0.00015670278,0.00008546628,0.00032578866,0.0001221088],"domain_scores_gemma":[0.99974036,0.000035057004,0.000037610913,0.00011804022,0.00005582824,0.000013118089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011902361,0.00007738931,0.000101994796,0.00007329254,0.00003546174,0.000026270503,0.00007153673,0.000040038438,0.0000026911491],"category_scores_gemma":[0.000038379945,0.000048422466,0.000019286454,0.00033954025,0.000014754957,0.00008741944,0.000017485305,0.00007415959,0.0000026681248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001256411,0.00000545841,0.0024141031,0.000023912296,0.00003462797,0.000005870359,0.00009645574,0.9946417,0.0007844919,0.00013963657,0.00042315666,0.001417984],"study_design_scores_gemma":[0.00066677935,0.000046982193,0.0913495,0.000029078346,0.000038490612,0.000014751766,0.00010607258,0.90713304,0.0005281712,0.000011084941,0.000021592132,0.00005444723],"about_ca_topic_score_codex":0.000017960358,"about_ca_topic_score_gemma":0.000013905423,"teacher_disagreement_score":0.08893539,"about_ca_system_score_codex":0.00025332163,"about_ca_system_score_gemma":0.000018025217,"threshold_uncertainty_score":0.19746108},"labels":[],"label_agreement":null},{"id":"W4366957295","doi":"10.1109/jiot.2023.3267625","title":"Optimal Scheduling in IoT-Driven Smart Isolated Microgrids Based on Deep Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Guelph","funders":"Natural Sciences and Engineering Research Council of Canada; University of Guelph","keywords":"Reinforcement learning; Markov decision process; Computer science; Mathematical optimization; Correctness; Scheduling (production processes); Time horizon; Partially observable Markov decision process; Renewable energy; Markov process; Artificial intelligence; Markov chain; Markov model; Machine learning; Algorithm; Engineering; Mathematics","score_opus":0.010027529359323134,"score_gpt":0.22026128525847619,"score_spread":0.21023375589915305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366957295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8506332,0.000041070885,0.14562105,0.000111267356,0.0017066852,0.00009000651,1.7015618e-7,0.00026074264,0.0015357968],"genre_scores_gemma":[0.99496967,0.00004913449,0.004327864,0.00011131449,0.00015571594,0.000007760129,0.000005828298,0.00006120848,0.00031150185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983035,0.000051076982,0.0006287414,0.00018071976,0.00038203085,0.00045397994],"domain_scores_gemma":[0.9994506,0.000077281176,0.00014866487,0.00016326868,0.00005605749,0.00010412316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006224688,0.00022981745,0.00027787485,0.0007802863,0.000045968907,0.0000949296,0.00038523859,0.000101215235,0.000120852776],"category_scores_gemma":[0.000060911047,0.00023871461,0.00014531199,0.00039904017,0.000027426107,0.00017480736,0.0000674872,0.0008821314,0.00009356801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006917903,0.000020090469,0.0021087262,0.00004893244,0.0001002402,0.00012592846,0.0008323544,0.9890544,0.005835218,0.0000129870805,0.0009067154,0.0008852265],"study_design_scores_gemma":[0.00078556413,0.00022539787,0.0005261474,0.0005125952,0.000016871953,0.000020652396,0.00013649449,0.98646265,0.009734175,0.0000069664306,0.0013586489,0.00021384061],"about_ca_topic_score_codex":0.00004991535,"about_ca_topic_score_gemma":0.0000055401524,"teacher_disagreement_score":0.14433646,"about_ca_system_score_codex":0.0002743555,"about_ca_system_score_gemma":0.00001767624,"threshold_uncertainty_score":0.97344995},"labels":[],"label_agreement":null},{"id":"W4367281612","doi":"10.1007/978-3-030-72322-4_65-1","title":"Machine Learning to Facilitate the Integration of Renewable Energies into the Grid","year":2022,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Renewable energy; Grid; Production (economics); Electricity; Environmental economics; Environmental science; Computer science; Process engineering; Industrial engineering; Engineering; Meteorology; Electrical engineering; Economics; Geography; Microeconomics","score_opus":0.022967082611408427,"score_gpt":0.19520186719085483,"score_spread":0.1722347845794464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367281612","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013796572,0.0010970107,0.005520621,0.00061856944,0.0010832724,0.00025497033,0.000013752158,0.00029142757,0.9909824],"genre_scores_gemma":[0.010031446,0.0013675753,0.0004999606,0.0001488711,0.00020003972,0.000101609505,0.0001303562,0.00008560198,0.98743457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990165,0.000028456603,0.00029994344,0.00018966415,0.0003152155,0.00015020191],"domain_scores_gemma":[0.99928,0.00011932403,0.000053125194,0.0004883848,0.00003224391,0.000026933456],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003315498,0.0002567657,0.0002183671,0.00013817474,0.00014862294,0.00003159388,0.000420461,0.000055908316,0.0018716538],"category_scores_gemma":[0.000027662789,0.0001514088,0.00011003454,0.000071411414,0.000038599508,0.000054692104,0.0003154478,0.0003691509,0.000044833265],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005175402,0.0000012893294,0.0000013423062,0.000025454146,0.00010966673,0.0000011452021,0.0014195292,0.9209908,0.00019396972,0.05419125,0.017980536,0.0050797896],"study_design_scores_gemma":[0.00004723639,0.000044174587,0.0000053590766,0.000023714161,0.00003508872,6.958457e-7,0.000355622,0.023307653,0.00043817877,0.0011751128,0.97439605,0.00017109438],"about_ca_topic_score_codex":0.0036120347,"about_ca_topic_score_gemma":0.0031008946,"teacher_disagreement_score":0.95641553,"about_ca_system_score_codex":0.00013449817,"about_ca_system_score_gemma":0.0000094366305,"threshold_uncertainty_score":0.9990408},"labels":[],"label_agreement":null},{"id":"W4367322618","doi":"10.1016/j.renene.2023.04.103","title":"An optimized scheduling strategy combining robust optimization and rolling optimization to solve the uncertainty of RES-CCHP MG","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Natural Science Foundation of China","keywords":"Microgrid; Robust optimization; Renewable energy; Scheduling (production processes); Demand response; Mathematical optimization; Optimization problem; Computer science; Automotive engineering; Engineering; Electricity; Mathematics","score_opus":0.01742498477894278,"score_gpt":0.22116670653569231,"score_spread":0.20374172175674954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367322618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016379131,0.00017855452,0.9805722,0.00008766098,0.00035484164,0.00014001495,0.0000047183635,0.00052584574,0.0017570311],"genre_scores_gemma":[0.8226426,0.0012531974,0.17501642,0.00008942005,0.0002465225,0.00010764445,0.0002602854,0.00013776186,0.00024614134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985453,0.0000611358,0.00040793803,0.00032739624,0.00026301199,0.00039520435],"domain_scores_gemma":[0.999144,0.00011734398,0.00008097723,0.00043687702,0.00009410273,0.00012671054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004793445,0.00023760292,0.0002883273,0.00030144004,0.00018620818,0.00012468518,0.0002637144,0.00010545955,0.000040842227],"category_scores_gemma":[0.000049345927,0.00021833363,0.000048842347,0.001019482,0.00003491439,0.00026342054,0.000098904995,0.00008424756,0.0000015169458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027064098,0.000013205076,0.000014427251,0.00003052573,0.0000707379,0.000003062162,0.00013146104,0.9971678,0.0013308242,0.0006224703,0.0002423868,0.00034598465],"study_design_scores_gemma":[0.0005671648,0.00006533846,0.0000156615,0.000068926274,0.00003591448,0.0000013623738,0.00054144446,0.99548256,0.0026951905,0.00007290567,0.00021711909,0.00023640612],"about_ca_topic_score_codex":0.0014931422,"about_ca_topic_score_gemma":0.00018099777,"teacher_disagreement_score":0.8062635,"about_ca_system_score_codex":0.000078953286,"about_ca_system_score_gemma":0.000030000214,"threshold_uncertainty_score":0.8903387},"labels":[],"label_agreement":null},{"id":"W4368246931","doi":"10.1007/978-3-031-29962-9_9","title":"Attention Towards Energy Infrastructures: Challenges and Solutions","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in systems, decision and control","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Environmental economics; Renewable energy; Energy engineering; Electrification; Corporate governance; Sustainability; Business; Efficient energy use; Critical infrastructure; Energy market; Rural electrification; Engineering; Electricity; Computer science; Computer security; Economics; Finance","score_opus":0.05745209365743016,"score_gpt":0.2582839712325953,"score_spread":0.20083187757516513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4368246931","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00022531077,0.73557967,0.009538873,0.00024504281,0.011220798,0.0007438898,0.00009903074,0.00067893474,0.24166846],"genre_scores_gemma":[0.43493617,0.5197441,0.00006111424,0.000058638314,0.00087065506,0.00028878133,0.000019280822,0.00016041455,0.043860838],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99846447,0.000028266835,0.0005379919,0.00038573926,0.00031497324,0.00026855225],"domain_scores_gemma":[0.9992282,0.00026541983,0.000080098005,0.0002870515,0.000075836186,0.00006341936],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034620444,0.0003750009,0.0007425062,0.00039006327,0.00009908517,0.00003958828,0.0001094304,0.00023247286,0.000005691706],"category_scores_gemma":[0.000057964357,0.00033373767,0.00006759888,0.000035763835,0.000108222404,0.000054712236,0.00020603221,0.00017002644,0.000013087379],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060022845,0.000009007405,0.000024920237,0.0012874922,0.0024828957,0.00016232063,0.00095205894,0.02013212,0.000012324539,0.5463875,0.031259313,0.39723],"study_design_scores_gemma":[0.0043343347,0.00017425622,0.006099065,0.0050596045,0.0004370185,0.000060723316,0.004206765,0.025140872,5.7432135e-7,0.07256865,0.88034755,0.0015705727],"about_ca_topic_score_codex":0.000023817489,"about_ca_topic_score_gemma":0.0003671702,"teacher_disagreement_score":0.84908825,"about_ca_system_score_codex":0.00012545886,"about_ca_system_score_gemma":0.000007654722,"threshold_uncertainty_score":0.9999115},"labels":[],"label_agreement":null},{"id":"W4376851132","doi":"10.1109/icjece.2022.3232213","title":"Energy Storage Management for Microgrids Using <i>n</i>-Step Bootstrapping","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy storage; Carbon footprint; Computer science; Renewable energy; Reinforcement learning; Control (management); Energy (signal processing); Smart grid; Reliability engineering; Artificial intelligence; Engineering; Electrical engineering; Greenhouse gas; Power (physics)","score_opus":0.008257578237875597,"score_gpt":0.17057037228279665,"score_spread":0.16231279404492105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376851132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06815039,0.0011445591,0.9292943,0.000037978796,0.0011285072,0.00006806698,0.0000028239388,0.0000957512,0.00007764718],"genre_scores_gemma":[0.98465157,0.0001810362,0.014100052,0.00008986923,0.00085813884,0.000008185358,0.0000044296457,0.00006218522,0.0000445288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990566,0.0000059461217,0.0002675517,0.00011301289,0.000091660666,0.00046523294],"domain_scores_gemma":[0.99946123,0.00004840152,0.000028887465,0.00008405374,0.000033651482,0.00034374467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012302607,0.00015800339,0.00020158445,0.00069168245,0.00006280978,0.00007726036,0.00015576127,0.00004904655,0.0000023942262],"category_scores_gemma":[0.0000036866204,0.00017079194,0.000083631276,0.0004985488,0.000009769886,0.00009000448,0.000017709086,0.000117170064,7.606271e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019927586,0.000002404553,0.00006141596,0.000079716956,0.00017171577,0.0001830525,0.000023343871,0.96827394,0.0003281544,0.001871408,0.0053344443,0.023668401],"study_design_scores_gemma":[0.00026176454,0.000048567246,0.0009385581,0.000057618574,0.00003218017,0.00007208967,0.0000048328297,0.9200549,0.00016673982,0.000037953498,0.07814776,0.00017704171],"about_ca_topic_score_codex":0.00007211276,"about_ca_topic_score_gemma":0.00005279258,"teacher_disagreement_score":0.91650116,"about_ca_system_score_codex":0.00015181546,"about_ca_system_score_gemma":0.00003475827,"threshold_uncertainty_score":0.69646937},"labels":[],"label_agreement":null},{"id":"W4377024611","doi":"10.20944/preprints202305.1021.v1","title":"Integrated Demand Response Programs in Energy Hubs: A Review of Applications, Classifications, Models and Future Directions","year":2023,"lang":"en","type":"review","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Demand response; Renewable energy; Greenhouse gas; Electricity; Environmental economics; Computer science; Electric power system; Energy consumption; Engineering; Power (physics); Economics; Electrical engineering","score_opus":0.18075370767676752,"score_gpt":0.3473781601796783,"score_spread":0.1666244525029108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377024611","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002507762,0.995846,0.0011134446,0.000079571386,0.00016564417,0.0014104155,0.000024168128,0.00049627444,0.0008394495],"genre_scores_gemma":[0.00004824082,0.99145776,0.00021834658,0.000014681258,0.00010707183,0.00737766,0.0002596393,0.00010526926,0.00041135505],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99762505,0.00033353936,0.0010286812,0.0005685416,0.00019595098,0.00024821472],"domain_scores_gemma":[0.99840915,0.00014900097,0.00021338116,0.0010591464,0.000081355174,0.00008797365],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001006853,0.00039075405,0.0010909537,0.00051012385,0.000045245877,0.000012748542,0.00039269516,0.00024756056,0.00004354894],"category_scores_gemma":[0.00006912015,0.00037229457,0.00019899647,0.0017256513,0.00005633461,0.000098949895,0.00020352409,0.00035967672,0.0000823588],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009734926,0.00012062011,0.00013539434,0.104815565,0.00044804293,0.000004897783,0.00008480602,0.0014005237,0.0000037129423,0.0034758127,0.00033120872,0.8891697],"study_design_scores_gemma":[0.00006709285,0.0000047165595,0.0001998267,0.02609964,0.00026588695,0.00000627683,0.00003007298,0.0010392638,0.000002839061,0.00011397515,0.97189,0.00028044407],"about_ca_topic_score_codex":0.000045484638,"about_ca_topic_score_gemma":0.00004472992,"teacher_disagreement_score":0.97155875,"about_ca_system_score_codex":0.0002452159,"about_ca_system_score_gemma":0.00009507508,"threshold_uncertainty_score":0.9998729},"labels":[],"label_agreement":null},{"id":"W4378651459","doi":"10.1007/978-3-031-33979-0","title":"Sustainable Energy for Smart Cities","year":2023,"lang":"en","type":"book","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Instituto Politécnico de Bragança; Universidade do Minho; Universidade Federal de Pernambuco; Universidade do Estado de Santa Catarina; Trường Đại học Bách Khoa Hà Nội; Università di Bologna; Universidade Federal de Santa Maria; Universidade de Pernambuco; Universidade do Porto; Universidade de São Paulo; Università degli Studi di Cagliari; Universidade Federal do Rio de Janeiro; Université de Tunis; Universidade Federal da Paraíba; Universidade de Coimbra; Trường Đại học Giao thông vận tải; University of Ontario Institute of Technology; Vestas","keywords":"Sustainable energy; Energy (signal processing); Environmental economics; Architectural engineering; Business; Economics; Engineering; Renewable energy; Electrical engineering; Physics","score_opus":0.015965817104024782,"score_gpt":0.21505715301183256,"score_spread":0.19909133590780778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378651459","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006694991,0.00038090328,0.99374205,0.00024500032,0.0011963189,0.00045508464,0.00007696008,0.0002353106,0.0036014286],"genre_scores_gemma":[0.0037162402,0.0005143723,0.98650664,0.0002250011,0.0008219525,0.00046928454,0.00038775572,0.00012342821,0.0072353403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998947,0.0000044317508,0.00046221196,0.000098450655,0.0001658522,0.00032201828],"domain_scores_gemma":[0.9989666,0.00033926495,0.00014399373,0.00039489483,0.00012253041,0.000032751108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002746421,0.0002532218,0.0003188269,0.00026342826,0.00063024176,0.00015119894,0.0010275905,0.00017070553,4.3796246e-7],"category_scores_gemma":[0.000048264923,0.00022490553,0.00018081689,0.00030421696,0.0002274938,0.00019762613,0.0004521615,0.00018734358,3.0948127e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.4262935e-7,0.0000028608235,6.0895366e-7,0.00066547125,0.000102568956,4.0731535e-8,0.00044311796,0.9588159,0.0000012222341,0.03327566,0.0048629353,0.0018290095],"study_design_scores_gemma":[0.00012557209,0.000025246592,0.000009103563,0.000102354956,0.00004526164,0.0000011555221,0.000014878429,0.70918095,0.000053027747,0.0016072645,0.28861666,0.00021851572],"about_ca_topic_score_codex":0.00003960669,"about_ca_topic_score_gemma":0.00011807528,"teacher_disagreement_score":0.28375372,"about_ca_system_score_codex":0.00015559579,"about_ca_system_score_gemma":0.00012687907,"threshold_uncertainty_score":0.9171381},"labels":[],"label_agreement":null},{"id":"W4378808134","doi":"10.18280/ijsdp.180527","title":"Empowering Sustainable Energy Communities in Thailand: Unveiling the Knowledge Transfer Process","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Sustainable energy; Knowledge transfer; Energy (signal processing); Business; Environmental resource management; Environmental planning; Environmental economics; Environmental science; Knowledge management; Engineering; Renewable energy; Computer science; Economics; Physics","score_opus":0.014167931376224985,"score_gpt":0.25603852571147373,"score_spread":0.24187059433524874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378808134","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98897946,0.0011711514,0.004069985,0.0001420161,0.00045300485,0.00006035252,3.7293933e-7,0.00006407739,0.0050596003],"genre_scores_gemma":[0.99795026,0.0002486919,0.000060867955,0.000034453165,0.00014517036,0.000017775508,0.00001169088,0.000021205178,0.0015098694],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9988947,0.000025946061,0.0003854732,0.00006737149,0.00026485638,0.0003616799],"domain_scores_gemma":[0.99941665,0.00015101934,0.00003948087,0.000060717786,0.00028798447,0.00004412971],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008365964,0.00013778188,0.0001526158,0.00074500235,0.00013689297,0.00014876365,0.0003762993,0.000040488227,0.000012641085],"category_scores_gemma":[0.00003148309,0.00011230781,0.000028361734,0.00038103957,0.000026942944,0.0003914132,0.00010418026,0.00021412017,0.0000012906036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007565045,0.000027126189,0.010917,0.00026934568,0.0003090937,0.0028584246,0.09202043,0.8816454,0.00002111488,0.0074953395,0.0012528594,0.0031082376],"study_design_scores_gemma":[0.0011997871,0.000031592557,0.017819451,0.00050320866,0.000016347693,0.00008729414,0.65870917,0.033497494,0.0012897423,0.0013489308,0.28510594,0.00039104137],"about_ca_topic_score_codex":0.0000475695,"about_ca_topic_score_gemma":0.000024113571,"teacher_disagreement_score":0.84814787,"about_ca_system_score_codex":0.00021006372,"about_ca_system_score_gemma":0.00010917461,"threshold_uncertainty_score":0.45797798},"labels":[],"label_agreement":null},{"id":"W4378906501","doi":"10.3390/en16114443","title":"Integrated Demand Response Programs in Energy Hubs: A Review of Applications, Classifications, Models and Future Directions","year":2023,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"Université Laval","keywords":"Demand response; Renewable energy; Environmental economics; Electricity; Greenhouse gas; Computer science; Electric power system; Energy consumption; Engineering; Power (physics); Electrical engineering; Economics","score_opus":0.05837437754148273,"score_gpt":0.2849221968615805,"score_spread":0.22654781932009777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378906501","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000031997445,0.9970736,0.00093924906,0.00006521848,0.00022039641,0.00065725885,0.000036258192,0.00054237054,0.0004624606],"genre_scores_gemma":[0.0000037700613,0.9922941,0.0007197139,0.000014104001,0.00016610562,0.005767964,0.00045074592,0.000114628965,0.00046886815],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980459,0.00025697943,0.00088635477,0.000382464,0.00018688907,0.0002413812],"domain_scores_gemma":[0.9988706,0.00019629906,0.00016971453,0.00063924567,0.00006277947,0.00006136476],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00050275004,0.00040877948,0.0011566918,0.0006364353,0.00004914456,0.000034677625,0.00029571608,0.00022955045,0.0000098461705],"category_scores_gemma":[0.00002975891,0.0003622452,0.00018487021,0.0019222477,0.00006715735,0.00011363073,0.00009194664,0.00023276056,0.0000069463695],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033158224,0.000031771244,3.8028386e-7,0.055799525,0.0001952586,0.0000028713266,0.00003483481,0.008784947,3.5632053e-7,0.007587135,0.0023000727,0.92525953],"study_design_scores_gemma":[0.00005631768,0.0000096205595,0.000003300155,0.030064356,0.00025060307,0.0000051782918,0.00007067183,0.0018666752,8.654828e-7,0.00013521011,0.9672476,0.0002896267],"about_ca_topic_score_codex":0.000048632053,"about_ca_topic_score_gemma":0.00009716291,"teacher_disagreement_score":0.9649475,"about_ca_system_score_codex":0.00017332281,"about_ca_system_score_gemma":0.0000899685,"threshold_uncertainty_score":0.99988294},"labels":[],"label_agreement":null},{"id":"W4379011114","doi":"10.1002/gas.22354","title":"Managing Peak Load in the Past, Present, and Future: Challenges and Opportunities for a Flexible Energy Future","year":2023,"lang":"en","type":"article","venue":"Climate and Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Distributed generation; Peak demand; Environmental economics; Renewable energy; Electricity generation; Base load power plant; Electrification; Electricity; Grid; Wind power; Business; Engineering; Power (physics); Economics; Electrical engineering","score_opus":0.041848341642612676,"score_gpt":0.22938365342559208,"score_spread":0.1875353117829794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379011114","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14440697,0.40331015,0.0017879761,0.16043454,0.0061187055,0.0006148245,0.000115479525,0.0033559527,0.2798554],"genre_scores_gemma":[0.1539594,0.8394689,0.0000759316,0.0006186047,0.004147688,0.0003315534,0.00006834465,0.00007639849,0.001253162],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911,0.00002832932,0.00014979017,0.00022812036,0.00011516814,0.0003686017],"domain_scores_gemma":[0.9996497,0.000065264285,0.000019985293,0.00019130597,0.000013559164,0.00006019155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022677297,0.00018776623,0.00017469848,0.00015297139,0.00010654583,0.00007522841,0.00010454986,0.00006926252,0.0000031928485],"category_scores_gemma":[9.957104e-7,0.0001509224,0.0000258409,0.00010598643,0.000041519426,0.00013620732,0.00012674028,0.000053711017,4.1529728e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040641266,0.000022086675,0.0000588978,0.0009548744,0.00012433428,0.00010136077,0.0026263786,0.009668577,0.000060274724,0.28502825,0.03931257,0.6620017],"study_design_scores_gemma":[0.0003706645,0.00003656986,0.0023887344,0.000027718706,0.000023160226,0.000012683085,0.008799216,0.02561401,0.000024771689,0.0018624064,0.96064067,0.0001993682],"about_ca_topic_score_codex":0.00003627269,"about_ca_topic_score_gemma":0.00016439488,"teacher_disagreement_score":0.9213281,"about_ca_system_score_codex":0.000015225548,"about_ca_system_score_gemma":0.0000039787797,"threshold_uncertainty_score":0.61544365},"labels":[],"label_agreement":null},{"id":"W4379116684","doi":"10.1109/tcomm.2023.3282220","title":"Power Control With QoS Guarantees: A Differentiable Projection-Based Unsupervised Learning Framework","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Communications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Projection (relational algebra); Differentiable function; Power control; Quality of service; Unsupervised learning; Control (management); Competitive learning; Power (physics); Artificial intelligence; Computer network; Mathematics; Algorithm","score_opus":0.014030329029693233,"score_gpt":0.22561910392406992,"score_spread":0.2115887748943767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379116684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013017469,0.000078106685,0.97890824,0.00079131674,0.0004766347,0.000492635,0.000025301895,0.002678169,0.0035320984],"genre_scores_gemma":[0.9951785,0.000237279,0.0030423189,0.00010141615,0.000027246073,0.0006185874,0.000025736541,0.000089198984,0.0006797119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884945,0.000117560376,0.00025184205,0.00021340724,0.000236985,0.00033078037],"domain_scores_gemma":[0.9979384,0.00049003446,0.00003277068,0.001394475,0.000071973045,0.00007237672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001361258,0.00023247594,0.00020359649,0.0004206472,0.0005890777,0.00007874427,0.00052684295,0.0001036158,0.00023192144],"category_scores_gemma":[0.0000075081543,0.00022820424,0.00010531898,0.0012189442,0.00009202516,0.00012650507,0.000003138354,0.0006841281,0.00029450606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028917259,0.00014317413,0.00010377715,0.000027167614,0.00021322921,0.00000147767,0.0003463408,0.9971434,0.0003197317,0.00020885534,0.00053547247,0.00092846784],"study_design_scores_gemma":[0.0011254507,0.00014783096,0.0007655347,0.00017393377,0.00010715778,0.0000018561028,0.00053649215,0.98129874,0.0012421993,0.00006362761,0.0141796805,0.00035749289],"about_ca_topic_score_codex":0.000044299104,"about_ca_topic_score_gemma":0.00012173127,"teacher_disagreement_score":0.98216105,"about_ca_system_score_codex":0.00011495019,"about_ca_system_score_gemma":0.00003445966,"threshold_uncertainty_score":0.93058985},"labels":[],"label_agreement":null},{"id":"W4379470567","doi":"10.1109/access.2023.3282729","title":"PIoT: A Performance IoT Simulation System for a Large-Scale City-Wide Assessment","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Telefonaktiebolaget LM Ericsson","keywords":"Computer science; Scale (ratio); Internet of Things; Embedded system; Cartography; Geography","score_opus":0.029118735435410728,"score_gpt":0.30245996498361716,"score_spread":0.27334122954820644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379470567","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71870464,0.000011690072,0.27490556,0.000043358097,0.0022678666,0.0003964764,0.000015673446,0.0012094419,0.0024452996],"genre_scores_gemma":[0.9983927,0.000011985346,0.00054244057,0.000047389578,0.0003638777,0.00024433638,0.000032041342,0.00005211359,0.0003131303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896145,0.000012667639,0.00023160539,0.00020784131,0.00021790879,0.00036854958],"domain_scores_gemma":[0.99943787,0.00012825632,0.000036110603,0.00029839703,0.000044871413,0.000054514046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029826668,0.00015028854,0.00016757072,0.00017468772,0.00011680835,0.000115584255,0.00030173006,0.000058152695,0.000014379353],"category_scores_gemma":[0.000009395487,0.00015764355,0.00005861914,0.00044243125,0.0000056890945,0.0002571407,0.000070934635,0.00008075591,0.00005838735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050941667,0.000010081204,0.008246029,0.00049909693,0.00003972531,0.0000025776092,0.00007205918,0.98560065,0.0000798921,0.00007422194,0.0044869944,0.0008835998],"study_design_scores_gemma":[0.000420445,0.000016675454,0.030517535,0.00006694127,0.000021916163,3.2269332e-7,0.00006143552,0.943744,0.0017656463,0.000011703021,0.02319687,0.0001764936],"about_ca_topic_score_codex":0.00000785012,"about_ca_topic_score_gemma":0.000025317451,"teacher_disagreement_score":0.27968803,"about_ca_system_score_codex":0.00021119635,"about_ca_system_score_gemma":0.000011014322,"threshold_uncertainty_score":0.64285177},"labels":[],"label_agreement":null},{"id":"W4379524693","doi":"10.1109/icps57144.2023.10142118","title":"Dynamic Microgrid Formation-Based Service Restoration Using Deep Reinforcement Learning in Distribution Networks","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Reinforcement learning; Computer science; Service (business); Distributed computing; Artificial intelligence","score_opus":0.00960932283631941,"score_gpt":0.2115547975634047,"score_spread":0.2019454747270853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379524693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19130401,0.000029289364,0.8070939,0.00010162738,0.00030638732,0.00015205484,4.7376264e-7,0.0007175193,0.0002946856],"genre_scores_gemma":[0.99798304,0.000035439294,0.0005439672,0.00006739224,0.00003449725,0.000032807493,0.0012415121,0.000022096257,0.00003926648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920434,0.000023252629,0.00026330614,0.000108528184,0.00013567305,0.0002649247],"domain_scores_gemma":[0.99974173,0.000027545824,0.000032876425,0.00013422534,0.000032619766,0.00003101191],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021780322,0.000115648894,0.00008753653,0.00015857283,0.00007524883,0.000046863515,0.00007535462,0.00005730257,0.000023610628],"category_scores_gemma":[0.000010945412,0.00013262928,0.00002345017,0.0009258069,0.000004808802,0.0002562872,0.000032649634,0.00012187106,0.000052135325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004007176,0.0000027874266,0.00039618314,0.00004888519,0.0000065603845,0.0000024431947,0.000046309546,0.99784565,0.00045133726,0.00007546391,0.00025826314,0.0008621055],"study_design_scores_gemma":[0.0002651053,0.000008729253,0.0033314347,0.0000359374,0.0000069704665,4.3410563e-7,0.0001149077,0.9939226,0.00027669728,0.000005844354,0.0018900802,0.00014128939],"about_ca_topic_score_codex":0.0001067692,"about_ca_topic_score_gemma":0.0007977015,"teacher_disagreement_score":0.806679,"about_ca_system_score_codex":0.00053703436,"about_ca_system_score_gemma":0.0000082992365,"threshold_uncertainty_score":0.5408465},"labels":[],"label_agreement":null},{"id":"W4379618410","doi":"10.32920/23332223.v1","title":"Optimal Energy Storage Solution to Reduce Electricity Bills for Class-A Customers in Ontario","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Electricity; Volatility (finance); Revenue; Purchasing; Work (physics); Economics; Business; Microeconomics; Operations management; Finance; Engineering; Electrical engineering","score_opus":0.02893685028678353,"score_gpt":0.23746873595292034,"score_spread":0.2085318856661368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379618410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2964874,0.00009659331,0.66687596,0.0006938694,0.009762468,0.0016507211,0.000043673987,0.0026387607,0.021750567],"genre_scores_gemma":[0.9532043,0.00009844526,0.016150765,0.00019436762,0.00049139606,0.0018090251,0.00035710481,0.00025153236,0.027443081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979181,0.000025276173,0.0004511993,0.0006523953,0.00026699726,0.0006859845],"domain_scores_gemma":[0.99914134,0.00006601447,0.000047650952,0.00055994926,0.000049467133,0.00013557087],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033333295,0.00040955853,0.00043187244,0.00087050063,0.000038787886,0.00006917106,0.0004143361,0.00033846882,0.000056530644],"category_scores_gemma":[0.00003567085,0.0004673663,0.000164925,0.00042490067,0.000011943666,0.000072377334,0.0004974546,0.00050392083,0.000057735735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024882054,0.000023123317,0.000054218435,0.00006929401,0.00010338292,0.000008422917,0.000116015966,0.94407165,0.0005919045,0.0009169126,0.05319064,0.000829554],"study_design_scores_gemma":[0.00050499116,0.000078616424,0.005895702,0.00010784932,0.000055145458,9.937013e-7,0.000036929625,0.754034,0.004052222,0.0002006952,0.23404387,0.0009890208],"about_ca_topic_score_codex":0.09514704,"about_ca_topic_score_gemma":0.35778055,"teacher_disagreement_score":0.6567169,"about_ca_system_score_codex":0.00352907,"about_ca_system_score_gemma":0.00014826674,"threshold_uncertainty_score":0.9997778},"labels":[],"label_agreement":null},{"id":"W4379739979","doi":"10.32920/23332223","title":"Optimal Energy Storage Solution to Reduce Electricity Bills for Class-A Customers in Ontario","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Arbitrage; Electricity; Volatility (finance); Revenue; Purchasing; Work (physics); Economics; Business; Microeconomics; Operations management; Finance; Engineering; Electrical engineering","score_opus":0.02893685028678353,"score_gpt":0.23746873595292034,"score_spread":0.2085318856661368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379739979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2964874,0.00009659331,0.66687596,0.0006938694,0.009762468,0.0016507211,0.000043673987,0.0026387607,0.021750567],"genre_scores_gemma":[0.9532043,0.00009844526,0.016150765,0.00019436762,0.00049139606,0.0018090251,0.00035710481,0.00025153236,0.027443081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979181,0.000025276173,0.0004511993,0.0006523953,0.00026699726,0.0006859845],"domain_scores_gemma":[0.99914134,0.00006601447,0.000047650952,0.00055994926,0.000049467133,0.00013557087],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033333295,0.00040955853,0.00043187244,0.00087050063,0.000038787886,0.00006917106,0.0004143361,0.00033846882,0.000056530644],"category_scores_gemma":[0.00003567085,0.0004673663,0.000164925,0.00042490067,0.000011943666,0.000072377334,0.0004974546,0.00050392083,0.000057735735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024882054,0.000023123317,0.000054218435,0.00006929401,0.00010338292,0.000008422917,0.000116015966,0.94407165,0.0005919045,0.0009169126,0.05319064,0.000829554],"study_design_scores_gemma":[0.00050499116,0.000078616424,0.005895702,0.00010784932,0.000055145458,9.937013e-7,0.000036929625,0.754034,0.004052222,0.0002006952,0.23404387,0.0009890208],"about_ca_topic_score_codex":0.09514704,"about_ca_topic_score_gemma":0.35778055,"teacher_disagreement_score":0.6567169,"about_ca_system_score_codex":0.00352907,"about_ca_system_score_gemma":0.00014826674,"threshold_uncertainty_score":0.9997778},"labels":[],"label_agreement":null},{"id":"W4379801371","doi":"10.1287/stsy.2022.004","title":"Optimally Scheduling Public Safety Power Shutoffs","year":2023,"lang":"en","type":"article","venue":"Stochastic Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Operations research; Scheduling (production processes); Computer science; Grid; Work (physics); Economics; Operations management; Engineering; Mathematics","score_opus":0.015726680109394802,"score_gpt":0.2051824507730204,"score_spread":0.1894557706636256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379801371","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03625646,0.0007065507,0.90512633,0.0002597332,0.012553154,0.0006208769,0.000022749344,0.0050832313,0.039370924],"genre_scores_gemma":[0.9979736,0.000009110874,0.0003640434,0.000017303873,0.00044141183,0.00012693029,0.000032271982,0.00009357481,0.0009417101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983673,0.000026687061,0.00037987315,0.00027305813,0.00036580703,0.00058726553],"domain_scores_gemma":[0.9992051,0.000105739266,0.000036385023,0.00044955034,0.00005239462,0.0001508386],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004415972,0.00023044937,0.00026125327,0.0003202528,0.00011131195,0.00013872396,0.00029502276,0.0000884521,0.00006502804],"category_scores_gemma":[0.000098000084,0.00023881858,0.0000717668,0.0007214081,0.000027317805,0.00014647571,0.00011019727,0.00014053291,0.0016533943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026784319,0.000005009371,0.000030472529,0.00006922109,0.000100848076,0.00001728386,0.000106504354,0.98437655,0.00018809462,0.011640196,0.0032918649,0.00017130567],"study_design_scores_gemma":[0.00031840306,0.000023270783,0.00070945366,0.00010485117,0.000015785805,0.000013507189,0.0004988368,0.98086125,0.000007225145,0.000036047397,0.017088467,0.00032291384],"about_ca_topic_score_codex":0.000019155,"about_ca_topic_score_gemma":0.000004478471,"teacher_disagreement_score":0.9617172,"about_ca_system_score_codex":0.00017290802,"about_ca_system_score_gemma":0.000024018855,"threshold_uncertainty_score":0.99912393},"labels":[],"label_agreement":null},{"id":"W4381189194","doi":"10.24018/ejece.2023.7.3.489","title":"Open Source SCADA System for Hybrid Power System for Francois, NL","year":2023,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Open source; Arduino; SCADA; Electrical engineering; Battery (electricity); Energy source; Power (physics); Computer science; Computer hardware; Generator (circuit theory); Embedded system; Engineering; Renewable energy; Operating system; Software; Physics","score_opus":0.0076955562950805296,"score_gpt":0.18549211445189662,"score_spread":0.17779655815681608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381189194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044881083,0.00021276025,0.95212007,0.00003276449,0.001982129,0.00019738746,0.0000020844036,0.00031599175,0.0002557268],"genre_scores_gemma":[0.9841373,0.000010564449,0.015252587,0.000019507057,0.0004848999,0.000007875599,6.5711424e-7,0.000050672035,0.00003593334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869484,0.000022804676,0.00038122613,0.00021942687,0.00025433232,0.00042737313],"domain_scores_gemma":[0.99931765,0.00012373782,0.000072260635,0.000175012,0.00011505718,0.00019627967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017059299,0.00016010879,0.00025804367,0.00035181642,0.00013570763,0.00032473536,0.00093174813,0.000012004288,2.703823e-7],"category_scores_gemma":[0.000043849963,0.00014276081,0.000077293975,0.000701158,0.000024016867,0.00024986477,0.00020260729,0.00012893662,0.000005801185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012291459,0.000006127375,0.000007400782,0.00018825408,0.000042127744,0.000049526374,0.000053561613,0.9798484,0.0012250652,0.0013690031,0.003916485,0.013281795],"study_design_scores_gemma":[0.0005676544,0.00027888056,0.0005428964,0.00018716224,0.000014152865,0.0001617422,0.000012569798,0.9733581,0.0014258757,0.0000020605028,0.023274576,0.00017436108],"about_ca_topic_score_codex":7.246791e-7,"about_ca_topic_score_gemma":2.872041e-8,"teacher_disagreement_score":0.9392562,"about_ca_system_score_codex":0.00012573737,"about_ca_system_score_gemma":0.000025701898,"threshold_uncertainty_score":0.58216166},"labels":[],"label_agreement":null},{"id":"W4381335354","doi":"10.24084/repqj21.263","title":"Energy Flows Optimization in a Renewable Energy Community with Storage Systems Integration","year":2023,"lang":"en","type":"article","venue":"Renewable Energy and Power Quality Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Renewable energy; Environmental economics; Tariff; Energy (signal processing); Energy storage; Business; Computer science; Economics; Engineering; International trade; Electrical engineering","score_opus":0.019250761940831168,"score_gpt":0.22957138901087037,"score_spread":0.2103206270700392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381335354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03158657,0.0013500006,0.94972724,0.00009895821,0.001521152,0.000056107838,0.000011791699,0.00046064873,0.015187552],"genre_scores_gemma":[0.9912335,0.002956951,0.00083519774,0.00012527322,0.00027152072,0.000055439166,0.00016580973,0.00008687902,0.004269425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971684,0.00084967894,0.00072475994,0.00025410022,0.00044583782,0.0005572207],"domain_scores_gemma":[0.9988307,0.0001925614,0.00016862414,0.00046483258,0.00011658069,0.00022672601],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015663268,0.00036473802,0.00046782682,0.00063481455,0.00040477153,0.00029296242,0.0002901447,0.0002089917,0.00006585053],"category_scores_gemma":[0.00003795909,0.00033209161,0.00007091927,0.0010689868,0.00005002702,0.0005546137,0.00009749021,0.00030969526,0.0000014064203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006555275,0.00005345068,0.00016371824,0.000043892807,0.00010982505,0.00004618394,0.0003604647,0.98725677,0.00041223786,0.0019716078,0.00890865,0.0006076635],"study_design_scores_gemma":[0.0010513298,0.0001504037,0.00028809404,0.00027385494,0.00002747116,0.00009099014,0.0015919921,0.93481463,0.0009802026,0.000656909,0.059541482,0.0005326553],"about_ca_topic_score_codex":0.04761419,"about_ca_topic_score_gemma":0.039950952,"teacher_disagreement_score":0.95964694,"about_ca_system_score_codex":0.00030208624,"about_ca_system_score_gemma":0.00006735863,"threshold_uncertainty_score":0.9999131},"labels":[],"label_agreement":null},{"id":"W4381431754","doi":"10.1287/stsy.2022.0004","title":"Optimally Scheduling Public Safety Power Shutoffs","year":2023,"lang":"en","type":"article","venue":"Stochastic Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Office of the President, University of California; Natural Sciences and Engineering Research Council of Canada; Advanced Research Projects Agency; Institut de Valorisation des Données; National Science Foundation","keywords":"Operations research; Scheduling (production processes); Computer science; Grid; Work (physics); Economics; Operations management; Engineering; Mathematics","score_opus":0.015726680109394802,"score_gpt":0.2051824507730204,"score_spread":0.1894557706636256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381431754","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03625646,0.0007065507,0.90512633,0.0002597332,0.012553154,0.0006208769,0.000022749344,0.0050832313,0.039370924],"genre_scores_gemma":[0.9979736,0.000009110874,0.0003640434,0.000017303873,0.00044141183,0.00012693029,0.000032271982,0.00009357481,0.0009417101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983673,0.000026687061,0.00037987315,0.00027305813,0.00036580703,0.00058726553],"domain_scores_gemma":[0.9992051,0.000105739266,0.000036385023,0.00044955034,0.00005239462,0.0001508386],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004415972,0.00023044937,0.00026125327,0.0003202528,0.00011131195,0.00013872396,0.00029502276,0.0000884521,0.00006502804],"category_scores_gemma":[0.000098000084,0.00023881858,0.0000717668,0.0007214081,0.000027317805,0.00014647571,0.00011019727,0.00014053291,0.0016533943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026784319,0.000005009371,0.000030472529,0.00006922109,0.000100848076,0.00001728386,0.000106504354,0.98437655,0.00018809462,0.011640196,0.0032918649,0.00017130567],"study_design_scores_gemma":[0.00031840306,0.000023270783,0.00070945366,0.00010485117,0.000015785805,0.000013507189,0.0004988368,0.98086125,0.000007225145,0.000036047397,0.017088467,0.00032291384],"about_ca_topic_score_codex":0.000019155,"about_ca_topic_score_gemma":0.000004478471,"teacher_disagreement_score":0.9617172,"about_ca_system_score_codex":0.00017290802,"about_ca_system_score_gemma":0.000024018855,"threshold_uncertainty_score":0.99912393},"labels":[],"label_agreement":null},{"id":"W4381855600","doi":"10.3389/fenrg.2023.1229000","title":"Editorial: Recent advances of edge computing for smart grid","year":2023,"lang":"en","type":"editorial","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor; University of Alberta","funders":"","keywords":"Enhanced Data Rates for GSM Evolution; Computer science; Smart grid; Grid; Engineering physics; Nanotechnology; Physics; Materials science; Engineering; Electrical engineering; Telecommunications; Geology","score_opus":0.02212165256982824,"score_gpt":0.3124666985653133,"score_spread":0.29034504599548505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381855600","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000006469202,0.0064893356,0.014381589,0.000025065914,0.97673875,0.00030203277,0.00016230695,0.0002970806,0.0015973805],"genre_scores_gemma":[0.0000103145085,0.03482989,0.0027933517,0.0000015775735,0.9597348,0.0003531037,0.0008871949,0.00027751658,0.0011122413],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948512,0.00022091216,0.0008154595,0.0006923269,0.002140169,0.0012799553],"domain_scores_gemma":[0.99656886,0.0016817772,0.00011188326,0.0007166422,0.0007733252,0.00014748683],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0030393698,0.00042574047,0.0008937035,0.0015225998,0.00011660662,0.000067839566,0.0011722252,0.00093997765,0.000007670492],"category_scores_gemma":[0.0022645432,0.00047984926,0.00016948316,0.0014879951,0.00018581486,0.00014346642,0.00044076386,0.001280117,0.0000072677044],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008026975,0.000028970815,0.00003128405,0.0006970095,0.00014899702,0.0000052706337,0.00004289011,0.17308648,0.0000057173374,0.000055757693,0.8082118,0.017605571],"study_design_scores_gemma":[0.0007189124,0.00013124186,0.0000062734543,0.00033765408,0.000016946373,4.112015e-8,0.00011910392,0.023845734,0.00017478204,0.0006112228,0.97365373,0.00038433223],"about_ca_topic_score_codex":0.0002665452,"about_ca_topic_score_gemma":0.00028997945,"teacher_disagreement_score":0.16544197,"about_ca_system_score_codex":0.00092923595,"about_ca_system_score_gemma":0.00025160628,"threshold_uncertainty_score":0.99976534},"labels":[],"label_agreement":null},{"id":"W4381894102","doi":"10.1109/iccad57653.2023.10152358","title":"Smart Agent-Based Direct Load Control of Air Conditioner Populations in Demand Side Management","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Smart grid; Air conditioning; Computer science; Demand response; Controller (irrigation); Electric power system; Load management; Renewable energy; Reliability (semiconductor); Control engineering; Process (computing); Operator (biology); Grid; Reliability engineering; Automotive engineering; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.01684209549960463,"score_gpt":0.22898632154681403,"score_spread":0.2121442260472094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381894102","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3944012,0.00019498097,0.23474917,0.001204878,0.0022275164,0.0015437853,0.00007379134,0.0029433307,0.36266136],"genre_scores_gemma":[0.9973098,0.000014379077,0.00073419046,0.00014801176,0.00002398784,0.00013175997,0.000065751636,0.000026747171,0.0015453446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999077,0.000025841564,0.0002910869,0.0001527672,0.00022255322,0.00023075512],"domain_scores_gemma":[0.99961656,0.00004699769,0.00002319207,0.0002507841,0.000020573538,0.000041917952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021235924,0.00012603932,0.00017707123,0.00033125322,0.000026101969,0.000008660407,0.000096534386,0.000034536817,0.00015467971],"category_scores_gemma":[0.000011372732,0.00013004409,0.000059218146,0.00052118313,0.000017966726,0.00006719422,0.000027541771,0.00004569517,0.00015838112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050761296,0.00002371627,0.007106644,0.00008061797,0.000072653784,0.000025239045,0.000016912665,0.977639,0.00019267763,0.0033716324,0.011139656,0.00032616997],"study_design_scores_gemma":[0.0019236202,0.000016745804,0.40763393,0.00005437123,0.00005876416,2.4445026e-7,0.000075487005,0.5706382,0.00162785,0.00032059354,0.01740331,0.000246927],"about_ca_topic_score_codex":0.0001062305,"about_ca_topic_score_gemma":0.0005138691,"teacher_disagreement_score":0.6029086,"about_ca_system_score_codex":0.00012272509,"about_ca_system_score_gemma":0.000005923611,"threshold_uncertainty_score":0.53030443},"labels":[],"label_agreement":null},{"id":"W4382239995","doi":"10.1609/aaai.v37i4.25636","title":"MSDC: Exploiting Multi-State Power Consumption in Non-intrusive Load Monitoring Based on a Dual-CNN Model","year":2023,"lang":"en","type":"article","venue":"Proceedings of the AAAI Conference on Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"National Natural Science Foundation of China","keywords":"Conditional random field; Computer science; Dual (grammatical number); State (computer science); Generalization; Power consumption; Artificial intelligence; Power (physics); Machine learning; Algorithm; Mathematics","score_opus":0.08998531909022335,"score_gpt":0.2933630415716923,"score_spread":0.20337772248146896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382239995","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98506576,0.000007139578,0.008793885,0.0002746744,0.00081117783,0.0004927609,0.000008023523,0.00035018826,0.004196391],"genre_scores_gemma":[0.9986599,0.00007864731,0.0008011887,0.000046401954,0.00005593302,0.00013629618,0.0000011430361,0.000050283637,0.0001701842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997931,0.0000100235575,0.0005803355,0.00041746115,0.00055346533,0.00050770905],"domain_scores_gemma":[0.99919105,0.00009568247,0.00015069178,0.0002416361,0.00024209208,0.000078872894],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052508834,0.000308293,0.00028090872,0.00036208314,0.00010273017,0.00011538401,0.000489746,0.00008974801,0.000033836015],"category_scores_gemma":[0.00029001906,0.00028440947,0.00009683375,0.00070369587,0.000103751816,0.00022528991,0.0001488331,0.00038072764,0.00028016244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000772525,0.00007881216,0.0015087724,0.00012934068,0.000017549273,0.000003805294,0.0017787981,0.9322705,0.054382756,0.0050792303,0.00008944751,0.0045837048],"study_design_scores_gemma":[0.000063291984,0.00004122159,0.0012623025,0.0005681738,0.0000068572595,2.634836e-7,0.00061605964,0.726775,0.26875812,0.0016926926,0.0000065004056,0.00020951919],"about_ca_topic_score_codex":0.000036423273,"about_ca_topic_score_gemma":0.000019174122,"teacher_disagreement_score":0.21437535,"about_ca_system_score_codex":0.00025814056,"about_ca_system_score_gemma":0.000036188092,"threshold_uncertainty_score":0.9999608},"labels":[],"label_agreement":null},{"id":"W4382364472","doi":"10.1016/j.renene.2023.118975","title":"Development of energy aggregators for virtual communities: The energy efficiency-flexibility nexus for demand response","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Demand response; News aggregator; Flexibility (engineering); Renewable energy; Energy management; Load shifting; Computer science; Environmental economics; Energy consumption; Efficient energy use; Demand management; Photovoltaic system; Electricity; Engineering; Energy (signal processing); Economics","score_opus":0.024445302078330157,"score_gpt":0.23721278587503944,"score_spread":0.2127674837967093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382364472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13208874,0.00054535834,0.86354864,0.00007653645,0.0015109815,0.00018496867,0.00005144091,0.00065955444,0.0013338007],"genre_scores_gemma":[0.9905215,0.00021337325,0.0025678112,0.00015715547,0.00020461982,0.0011602629,0.0002225694,0.00013523812,0.0048175026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976921,0.00016367214,0.0007175496,0.00032792782,0.0003616147,0.0007371324],"domain_scores_gemma":[0.99719185,0.0014702306,0.00013149697,0.0009285603,0.00015247318,0.00012540769],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013244059,0.00038041564,0.00044032303,0.0003566858,0.00043665944,0.000050618997,0.0007580842,0.00016005935,0.000021817554],"category_scores_gemma":[0.00012447269,0.0003272013,0.00020791385,0.0008103029,0.00013900634,0.00010957366,0.0002473437,0.00005872122,0.0000017672403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031167295,0.000048102644,0.000008788195,0.000071171715,0.00018936585,0.0000013046248,0.00057420967,0.97346807,0.003146611,0.010455427,0.008855524,0.002869733],"study_design_scores_gemma":[0.00064993167,0.00011954807,0.000047194346,0.000051615665,0.000030387813,0.0000012272387,0.0011667022,0.4441,0.09883753,0.0009816091,0.45369798,0.00031628268],"about_ca_topic_score_codex":0.0015357813,"about_ca_topic_score_gemma":0.0035103736,"teacher_disagreement_score":0.8609808,"about_ca_system_score_codex":0.00024636945,"about_ca_system_score_gemma":0.00018101449,"threshold_uncertainty_score":0.999918},"labels":[],"label_agreement":null},{"id":"W4382468088","doi":"10.1109/access.2023.3290909","title":"Hedging Investments of Grid-Connected PV-BESS in Buildings Using Cryptocurrency Mining: A Case Study in Finland","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Apartment; Investment (military); Environmental science; Dispatchable generation; Electricity; Grid; Computer science; Automotive engineering; Business; Distributed generation; Civil engineering; Engineering; Electrical engineering; Economics","score_opus":0.07996899422293294,"score_gpt":0.3376155358785572,"score_spread":0.2576465416556243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382468088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99740875,0.000052660558,0.0004000197,0.0000071133977,0.0013135873,0.00043777542,0.0000043612363,0.00016240352,0.00021333873],"genre_scores_gemma":[0.9995286,0.000010518217,0.00020821355,0.00001414824,0.00009051025,0.00009022728,0.0000038691,0.000045333658,0.000008619953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853444,0.00005788228,0.0004939522,0.00030408718,0.00021162778,0.00039800256],"domain_scores_gemma":[0.99944174,0.000106063875,0.000067477886,0.00030100282,0.000025969315,0.000057767156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003401367,0.00021171854,0.00032197978,0.0009616645,0.000035190613,0.000063739906,0.00034833697,0.00005816688,0.000014770441],"category_scores_gemma":[0.00005533475,0.00023884843,0.000032450895,0.0020263907,0.000020373413,0.00041132598,0.00017537874,0.00014781476,0.000005419017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057197344,0.00008834114,0.38004646,0.00012546351,0.000039936247,0.0018738536,0.0018036036,0.6146913,0.00052583707,0.000007800853,0.00022099308,0.0005706711],"study_design_scores_gemma":[0.0041897837,0.000095096366,0.27464157,0.0005786762,0.000064244385,0.00009226345,0.0041498058,0.7107044,0.004387159,0.00015405024,0.00014418777,0.00079875],"about_ca_topic_score_codex":0.0017253044,"about_ca_topic_score_gemma":0.00097185065,"teacher_disagreement_score":0.10540486,"about_ca_system_score_codex":0.00014859153,"about_ca_system_score_gemma":0.000020121854,"threshold_uncertainty_score":0.9739956},"labels":[],"label_agreement":null},{"id":"W4382812750","doi":"10.1007/s10287-023-00456-0","title":"Optimal allocation of demand response considering transmission system congestion","year":2023,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Computer science; Scheduling (production processes); News aggregator; Grid; Operations research; Mathematical optimization; Smart grid; Electricity","score_opus":0.013457165162797562,"score_gpt":0.23107656561281498,"score_spread":0.2176194004500174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382812750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46567336,0.00002514148,0.5307769,0.00012852234,0.00035967777,0.00020182696,0.0000013450627,0.0005146651,0.0023185587],"genre_scores_gemma":[0.9827035,0.00001427436,0.017127283,0.00001054732,0.000015532205,0.000026616706,0.000011006533,0.000011524442,0.000079719815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879104,0.000030211682,0.00024120176,0.00022118069,0.00051961123,0.00019678388],"domain_scores_gemma":[0.99959165,0.000100930796,0.000038135393,0.00014689188,0.00006531738,0.000057102876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010464452,0.00009670139,0.00009472794,0.00053550774,0.00012676141,0.000041992487,0.00021728704,0.000017872302,0.0000066594],"category_scores_gemma":[0.000017034787,0.00010556206,0.000024770141,0.0011740602,0.00012671325,0.00023358442,0.000079291865,0.000035519526,0.000051166913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019894795,0.000005902318,0.000072204806,0.00019006775,0.000016600521,0.00000942685,0.00009524918,0.979173,0.0019972704,0.016198851,0.0003381702,0.0018833448],"study_design_scores_gemma":[0.00021942909,0.000016846581,0.067987114,0.00010444559,0.000012276785,0.0000025307181,0.00021377958,0.92928946,0.0011681003,0.00018580038,0.0007000944,0.000100114645],"about_ca_topic_score_codex":0.0000012751347,"about_ca_topic_score_gemma":1.1900435e-7,"teacher_disagreement_score":0.5170301,"about_ca_system_score_codex":0.00013660274,"about_ca_system_score_gemma":0.000017172004,"threshold_uncertainty_score":0.43046957},"labels":[],"label_agreement":null},{"id":"W4382936323","doi":"10.23919/acc55779.2023.10156533","title":"A novel scheme for randomized customer-sensitivity-based control of thermostatic loads for better integration of intermittent renewables","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Probabilistic logic; Grid; Controllability; Thermostat; Renewable energy; News aggregator; Demand response; Distributed computing; Engineering; Electricity","score_opus":0.01611224869667828,"score_gpt":0.2359497467344372,"score_spread":0.21983749803775893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382936323","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057569005,0.000010190423,0.93988925,0.00032791184,0.00026031147,0.0012920161,0.000053705022,0.00017114269,0.00042646404],"genre_scores_gemma":[0.97558403,0.000003794921,0.023238635,0.000152451,0.00004554522,0.00068210904,0.00007724996,0.00004040046,0.00017579232],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990807,0.000032023192,0.00043682577,0.00013557366,0.00012573777,0.0001891328],"domain_scores_gemma":[0.9984268,0.001146764,0.00008757838,0.00019100291,0.0001223855,0.000025462201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007611297,0.0001501162,0.00051695795,0.00022725992,0.000016560216,0.000009570843,0.000071714836,0.000047270092,0.000012437583],"category_scores_gemma":[0.00020829432,0.00012169896,0.00024230554,0.00017573702,0.00004920206,0.000054492044,0.000011189091,0.000027496053,0.0000023108144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0050770915,0.00005945393,0.000024044706,0.00061011576,0.00047634722,5.777745e-7,0.000119271,0.4110654,0.570864,0.002660872,0.0045605446,0.0044822725],"study_design_scores_gemma":[0.050533406,0.00003627259,0.000051304498,0.00007311754,0.000091319955,1.572385e-7,0.00006965944,0.80718756,0.1413194,0.00012463206,0.00040762543,0.00010556402],"about_ca_topic_score_codex":0.00004622471,"about_ca_topic_score_gemma":0.000072426905,"teacher_disagreement_score":0.918015,"about_ca_system_score_codex":0.000033982153,"about_ca_system_score_gemma":0.00001251754,"threshold_uncertainty_score":0.49627396},"labels":[],"label_agreement":null},{"id":"W4383040766","doi":"10.2139/ssrn.4499676","title":"Effectiveness: Demand Response Programs Comparing Price Signals and Direct Load Control","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Control (management); Computer science; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.01197873056109046,"score_gpt":0.22981999777697032,"score_spread":0.21784126721587985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383040766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8579789,0.019127203,0.117662534,0.00016946155,0.001857895,0.0011985332,0.0000058536193,0.0012098558,0.00078976457],"genre_scores_gemma":[0.99295056,0.0059484863,0.000060003782,0.000010037648,0.00035210585,0.00019914613,0.000008655664,0.00016985461,0.0003011601],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99521405,0.0006133519,0.0005189586,0.00051635964,0.000530784,0.0026065144],"domain_scores_gemma":[0.9986504,0.0004903909,0.00017703175,0.00039889087,0.00011188629,0.0001714201],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.008700926,0.00055001536,0.0007937332,0.00031976218,0.00017716942,0.00030458817,0.00046891,0.00025987497,0.000008754064],"category_scores_gemma":[0.0001779398,0.0005474931,0.00021132086,0.00023868454,0.000058160993,0.0001247752,0.00032489162,0.003515158,0.000039270628],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009075371,0.000055919863,0.006284607,0.0005774923,0.0031456668,0.00006795155,0.00016334785,0.9826605,0.0012064005,0.00091736263,0.00014928977,0.0038639663],"study_design_scores_gemma":[0.020467704,0.0029324302,0.19351318,0.0074358024,0.0032127304,0.0015144289,0.0014943781,0.5949049,0.002488207,0.15020302,0.014360023,0.007473186],"about_ca_topic_score_codex":0.000064099164,"about_ca_topic_score_gemma":0.00030806102,"teacher_disagreement_score":0.38775554,"about_ca_system_score_codex":0.0031465732,"about_ca_system_score_gemma":0.0008474764,"threshold_uncertainty_score":0.9996977},"labels":[],"label_agreement":null},{"id":"W4383163694","doi":"10.1016/j.epsr.2023.109644","title":"Non-intrusive load monitoring: Comparative analysis of transient state clustering methods","year":2023,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Cluster analysis; Computer science; Transient (computer programming); Data mining; Algorithm; Data stream clustering; Correlation clustering; CURE data clustering algorithm; Artificial intelligence","score_opus":0.07768111925133246,"score_gpt":0.4038298559469589,"score_spread":0.32614873669562644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383163694","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77251244,0.0021494778,0.20171449,0.000028871598,0.0022284226,0.0010295282,0.000016452943,0.00056510064,0.019755201],"genre_scores_gemma":[0.9978677,0.0002577199,0.00028888264,8.8306984e-7,0.0000653454,0.00021115053,0.0000075033977,0.00003832554,0.0012624877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963851,0.0004384074,0.0005716342,0.00038669223,0.0012688969,0.0009492824],"domain_scores_gemma":[0.99835265,0.00042643028,0.000055824104,0.00056953396,0.00043701762,0.00015856624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003524015,0.00022410124,0.00068626663,0.0028684356,0.000110158086,0.00008430326,0.0004600119,0.00007825365,0.000021835725],"category_scores_gemma":[0.000060410017,0.00022347481,0.00016662286,0.012104206,0.00004222876,0.000108215616,0.00012591323,0.00042590912,0.00009238261],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026374486,0.000022481436,0.00037889776,0.00015892119,0.0025152036,0.00003091997,0.0038583358,0.95926315,0.02992942,0.00003166312,0.002884853,0.0008997886],"study_design_scores_gemma":[0.000261034,0.00012064623,0.018418241,0.00005877858,0.000110581495,0.0000012651564,0.0009881987,0.949284,0.023906862,0.000005708311,0.006614089,0.00023059601],"about_ca_topic_score_codex":0.0006405999,"about_ca_topic_score_gemma":0.000036573772,"teacher_disagreement_score":0.22535524,"about_ca_system_score_codex":0.0007224526,"about_ca_system_score_gemma":0.000074283744,"threshold_uncertainty_score":0.9113038},"labels":[],"label_agreement":null},{"id":"W4383619748","doi":"10.1007/978-3-031-32828-2_7","title":"Demand Side Management and Transactive Energy Strategies for Smart Cities","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in big data","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Smart grid; Stakeholder; Environmental economics; Business; Process management; Grid; Computer science; Risk analysis (engineering); Economics; Engineering; Political science; Public relations","score_opus":0.14657888858299187,"score_gpt":0.282907985968813,"score_spread":0.13632909738582114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383619748","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004030492,0.031815313,0.040604126,0.00024527113,0.008560823,0.0011349045,0.0026467924,0.00091901515,0.9140335],"genre_scores_gemma":[0.023228526,0.37346762,0.0035726945,0.0003315437,0.0023302047,0.001382669,0.0033222355,0.0008395629,0.5915249],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985562,0.000008058652,0.00034330573,0.00057031907,0.00019848075,0.0003236216],"domain_scores_gemma":[0.99892306,0.00016002392,0.000044275814,0.0008123027,0.000027146954,0.000033173303],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020192897,0.0004334839,0.0005183627,0.00032109706,0.00007841374,0.000051925268,0.00045294163,0.00011735142,0.000004300284],"category_scores_gemma":[0.0000070295614,0.00044586987,0.000045469817,0.000051989,0.00016764627,0.00016183803,0.00068504736,0.00013423698,0.00000586531],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007256423,0.000015650512,0.00000848714,0.005560209,0.009611866,0.00032899773,0.0016490543,0.030665098,0.0000019498166,0.59479237,0.31145716,0.045836568],"study_design_scores_gemma":[0.0007570478,0.000053356205,0.00007469441,0.00074561295,0.00043477616,0.0000023916061,0.0060668527,0.00233693,0.000009843912,0.10876135,0.8799143,0.00084285],"about_ca_topic_score_codex":0.000034192766,"about_ca_topic_score_gemma":0.0028056153,"teacher_disagreement_score":0.5684571,"about_ca_system_score_codex":0.000103270584,"about_ca_system_score_gemma":0.000009699561,"threshold_uncertainty_score":0.9997993},"labels":[],"label_agreement":null},{"id":"W4383824969","doi":"10.23977/jeeem.2023.060310","title":"Optimized Particle Swarm Algorithm for Advanced Bi-Level Dispatch in New Energy Power Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Electrotechnology Electrical Engineering and Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Computer science; Scheduling (production processes); Photovoltaic system; Inertia; Entropy (arrow of time); Electricity generation; Power (physics); Engineering; Algorithm; Mathematics","score_opus":0.006505220752423151,"score_gpt":0.1967751218376978,"score_spread":0.19026990108527464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383824969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02150038,0.0026700818,0.9738733,0.0004826977,0.0005980466,0.0003098353,0.0000012242195,0.0005005834,0.00006386278],"genre_scores_gemma":[0.9053452,0.014928688,0.077492945,0.00008743923,0.00020027987,0.0003590177,0.000007792577,0.00019643357,0.0013821783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983599,0.000012906845,0.000526692,0.00020979853,0.00019657143,0.0006940988],"domain_scores_gemma":[0.9995024,0.00008214427,0.00007513148,0.00018448221,0.00003508968,0.000120732795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031276114,0.00023980756,0.00042817168,0.00089067686,0.000031747673,0.00003316709,0.00025156696,0.00012994092,0.0000015826138],"category_scores_gemma":[0.000043145134,0.00023701234,0.000087571585,0.0012768483,0.0000134768015,0.000110151566,0.00006433352,0.00030023005,0.0000021202832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036498554,0.000032471824,0.0000054382795,0.000060349565,0.0002710952,0.00010885337,0.000012697309,0.9231778,0.0022276873,0.013703436,0.0030371533,0.057326555],"study_design_scores_gemma":[0.0022401516,0.00037936078,0.00015835118,0.00006446371,0.00005094479,0.000044899076,0.000023241815,0.96105057,0.005235464,0.00037370747,0.030111885,0.00026696594],"about_ca_topic_score_codex":0.000009081237,"about_ca_topic_score_gemma":0.0000018938536,"teacher_disagreement_score":0.89638036,"about_ca_system_score_codex":0.00020712479,"about_ca_system_score_gemma":0.000016807338,"threshold_uncertainty_score":0.9665083},"labels":[],"label_agreement":null},{"id":"W4384303168","doi":"10.1007/978-3-031-36822-6_5","title":"Deep Learning Based Solution for Appliance Operational State Detection and Power Estimation in Non-intrusive Load Monitoring","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Benchmarking; Deep learning; State (computer science); Artificial intelligence; Power (physics); Power consumption; Architecture; Real-time computing; Machine learning; Data mining; Algorithm","score_opus":0.009046948901280718,"score_gpt":0.2191299090918681,"score_spread":0.2100829601905874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384303168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011807153,0.000066779896,0.9966049,0.000037204765,0.0014959525,0.00036688763,0.0000012952382,0.00013274107,0.00011352822],"genre_scores_gemma":[0.89572656,0.000027685921,0.103815585,0.000032762597,0.00019801647,0.00008187158,0.000008450474,0.00004714394,0.00006194049],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987367,0.0000065896447,0.00022765619,0.00044055286,0.00031899166,0.00026955982],"domain_scores_gemma":[0.9995087,0.00017213989,0.00005270791,0.0001454461,0.0000838622,0.00003717278],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003772269,0.0002183097,0.0001722634,0.00039904128,0.00012210086,0.00013071205,0.00016145443,0.00010928436,0.0000020632672],"category_scores_gemma":[0.0000576413,0.0002484639,0.00002589366,0.00022521763,0.000073804964,0.00021712486,0.00008677955,0.00030623827,0.0000063988387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004815447,0.0000015259304,0.000044594828,0.000044652817,0.000003878301,0.0000029236983,0.00015667621,0.8329809,0.00044246332,0.000024746827,6.7838624e-7,0.16629218],"study_design_scores_gemma":[0.00022986991,0.00004361806,0.0014923712,0.0002186368,0.0000036636404,0.0000013005366,3.1844587e-7,0.9936756,0.0020806564,0.0019407134,0.00007820202,0.00023505701],"about_ca_topic_score_codex":0.000017484921,"about_ca_topic_score_gemma":0.00016288532,"teacher_disagreement_score":0.89454585,"about_ca_system_score_codex":0.0005854914,"about_ca_system_score_gemma":0.000042987387,"threshold_uncertainty_score":0.9999968},"labels":[],"label_agreement":null},{"id":"W4384695854","doi":"10.22215/etd/2023-15622","title":"Auction-Based Mechanisms for Power Grid Balancing using Cloud Datacenters","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Cloud computing; Computer science; Distributed computing; Grid; Flexibility (engineering); Renewable energy; Load balancing (electrical power); Efficient energy use; Energy consumption; Scheduling (production processes); Operating system; Engineering; Operations management; Economics; Electrical engineering","score_opus":0.014028701316792703,"score_gpt":0.24041757879710896,"score_spread":0.22638887748031625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384695854","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031137528,0.000068973575,0.8697297,0.000037412847,0.089236155,0.0011387096,0.0001921365,0.0032672128,0.005192198],"genre_scores_gemma":[0.538567,0.00027535338,0.20215137,0.0014660816,0.014066858,0.0030509043,0.1295565,0.006026913,0.10483901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987104,0.00000924679,0.0003150526,0.00035012435,0.00024326149,0.00037191948],"domain_scores_gemma":[0.9993977,0.000055269782,0.00006148764,0.00037002092,0.000051395138,0.000064136075],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015598048,0.00033491955,0.00027517157,0.00030765877,0.00009131947,0.000073265976,0.00021205205,0.00018510324,0.00014746276],"category_scores_gemma":[0.000024195062,0.00037447855,0.00014675729,0.00022234589,0.000004302759,0.00009316264,0.000017765175,0.00014261133,0.000059066257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002354826,0.000010237877,0.0000059404415,0.000544648,0.00021695365,0.000005029832,0.000063733045,0.95281535,0.002603924,0.00092116854,0.0426674,0.00012205483],"study_design_scores_gemma":[0.00062454917,0.000035699744,0.00016017741,0.000324479,0.00019910795,7.093941e-7,0.0013908698,0.9593246,0.019566001,0.00021195122,0.017366914,0.0007949245],"about_ca_topic_score_codex":0.00008848096,"about_ca_topic_score_gemma":0.00033518346,"teacher_disagreement_score":0.6675783,"about_ca_system_score_codex":0.0002769034,"about_ca_system_score_gemma":0.000032042604,"threshold_uncertainty_score":0.9998707},"labels":[],"label_agreement":null},{"id":"W4384786903","doi":"10.1016/b978-0-443-15274-0.50085-8","title":"A sustainable energy supply system in smart cities: an integrated natural gas and electricity network operation","year":2023,"lang":"en","type":"book-chapter","venue":"Computer-aided chemical engineering/Computer aided chemical engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Electricity; Mathematical optimization; Linear programming; Integer programming; Energy storage; Natural gas; Computer science; Stochastic programming; Energy supply; Order (exchange); Environmental pollution; Energy (signal processing); Engineering; Environmental science; Waste management; Mathematics; Electrical engineering; Power (physics); Business","score_opus":0.004311981474474566,"score_gpt":0.15714083209549953,"score_spread":0.15282885062102497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384786903","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046814807,0.0024696107,0.9239818,0.000081646336,0.0077300565,0.0017011391,0.000073931245,0.015281247,0.0018657693],"genre_scores_gemma":[0.82159495,0.00081680913,0.13977417,0.00037701533,0.018677207,0.0010143018,0.0048718816,0.004158751,0.00871491],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99358535,0.000024308956,0.0017387709,0.0017114525,0.00074918085,0.0021909554],"domain_scores_gemma":[0.9974303,0.00041724625,0.0001582459,0.0010728977,0.00019855918,0.00072270766],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.00040394126,0.0020911393,0.0020151224,0.0010697665,0.00008192389,0.0004434725,0.0011053724,0.0012743823,0.000020640226],"category_scores_gemma":[0.00004196023,0.0024722936,0.00039068598,0.00073214225,0.0000816391,0.0005535184,0.00097407366,0.0023090446,0.000023420034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029729656,0.00002996612,0.0000038061867,0.0018051099,0.0004392199,0.00045960527,0.00012787536,0.9558766,0.0063892584,0.02967044,0.0022903522,0.0028780226],"study_design_scores_gemma":[0.0011143088,0.00009439793,0.000013508966,0.0014950222,0.00010788347,0.00014803246,0.000009284961,0.97549427,0.008378071,0.00019010622,0.0106820725,0.0022730348],"about_ca_topic_score_codex":0.00009293576,"about_ca_topic_score_gemma":0.0000065485906,"teacher_disagreement_score":0.78420764,"about_ca_system_score_codex":0.0020985943,"about_ca_system_score_gemma":0.00007221605,"threshold_uncertainty_score":0.99999267},"labels":[],"label_agreement":null},{"id":"W4384788992","doi":"10.1016/b978-0-443-15274-0.50463-7","title":"Optimal operation of a sustainable water desalination unit integrated a green energy system","year":2023,"lang":"en","type":"book-chapter","venue":"Computer-aided chemical engineering/Computer aided chemical engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flexibility (engineering); Mathematical optimization; Desalination; Computer science; Integer programming; Energy (signal processing); Unit (ring theory); Linear programming; Algorithm; Mathematics","score_opus":0.007083266885152551,"score_gpt":0.16352864742415954,"score_spread":0.156445380539007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384788992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008161084,0.0002214961,0.98018175,0.000051966534,0.0024400237,0.0007093235,0.00006293837,0.006543851,0.0016275583],"genre_scores_gemma":[0.6087833,0.00025494405,0.3245382,0.00023821398,0.017639246,0.0012965753,0.01048712,0.0065297517,0.030232634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9938055,0.000019657426,0.0020513989,0.0013585875,0.0009631568,0.0018016548],"domain_scores_gemma":[0.9972791,0.0002668467,0.00020040473,0.0012256845,0.0004498022,0.0005781454],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.00038238306,0.0019431089,0.001972905,0.001261917,0.000068361456,0.00021281878,0.001338995,0.0013849132,0.000049553586],"category_scores_gemma":[0.000029703502,0.002029771,0.0006771305,0.0004745881,0.000088346984,0.0004087605,0.0012983204,0.001430216,0.000087979985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002293975,0.000035042063,2.51333e-7,0.0029648154,0.0008370391,0.00024835617,0.00015134904,0.8897001,0.058894493,0.04494292,0.00108955,0.0011131534],"study_design_scores_gemma":[0.0009117143,0.00007849313,0.0000012738856,0.0011289959,0.00019436631,0.00007403341,0.0000067851456,0.81955117,0.16256422,0.00006929266,0.013771793,0.0016478383],"about_ca_topic_score_codex":0.000066383036,"about_ca_topic_score_gemma":7.1116614e-7,"teacher_disagreement_score":0.6556435,"about_ca_system_score_codex":0.0013762935,"about_ca_system_score_gemma":0.000059029633,"threshold_uncertainty_score":0.9999115},"labels":[],"label_agreement":null},{"id":"W4385211414","doi":"10.1007/s12053-023-10135-3","title":"Human-centered determinants of price and incentive-based residential demand response in Ottawa, Canada","year":2023,"lang":"en","type":"article","venue":"Energy Efficiency","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Incentive; Demand response; Sustainable development; Economics; Business; Natural resource economics; Engineering; Microeconomics; Political science","score_opus":0.008787419351152764,"score_gpt":0.22002247985989198,"score_spread":0.21123506050873922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385211414","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99771833,0.00011684003,0.0009324629,0.000024640334,0.0003910725,0.000060867817,0.0000063355606,0.00009554648,0.0006538923],"genre_scores_gemma":[0.99955827,0.000015275578,0.000037001366,0.000021660158,0.000025028952,0.000017929955,0.000005587076,0.000025120868,0.00029412418],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9987498,0.00009063996,0.00033891128,0.00022066075,0.0002615208,0.0003384658],"domain_scores_gemma":[0.99953496,0.00010070488,0.00004906251,0.00023300639,0.000020721916,0.00006156141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003506519,0.00014650256,0.00019218131,0.00033345303,0.00005798827,0.000014342989,0.00018993526,0.00004525464,0.000018535911],"category_scores_gemma":[0.000059552855,0.00016067638,0.000024350187,0.0006257547,0.000045063534,0.000054096632,0.00007862221,0.00006062912,0.0000015235167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008671237,0.0000497763,0.022383142,0.000103280916,0.000016389356,0.00023446887,0.0001274286,0.9648692,0.008678923,0.00024377521,0.0027983428,0.00040854784],"study_design_scores_gemma":[0.0013337069,0.00009459463,0.6365494,0.00013281585,0.000011874011,0.000001358555,0.0000883727,0.32644668,0.030540891,0.000021654434,0.004444177,0.00033448584],"about_ca_topic_score_codex":0.0575083,"about_ca_topic_score_gemma":0.29643846,"teacher_disagreement_score":0.63842255,"about_ca_system_score_codex":0.00015049122,"about_ca_system_score_gemma":0.0000876412,"threshold_uncertainty_score":0.94876784},"labels":[],"label_agreement":null},{"id":"W4385229680","doi":"10.53055/icimod.1025","title":"Handbook for on-grid rooftop solar PV design optimization","year":2023,"lang":"en","type":"book","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"European Commission; International Development Research Centre; World Bank Group","keywords":"Photovoltaic system; Grid-connected photovoltaic power system; Grid; Photovoltaic mounting system; Rooftop photovoltaic power station; Engineering; Architectural engineering; Electrical engineering; Systems engineering; Automotive engineering; Computer science; Inverter; Maximum power point tracking; Geography","score_opus":0.028429943493107325,"score_gpt":0.20413147555858355,"score_spread":0.17570153206547623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385229680","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.9388965e-8,0.00017854644,0.73269373,0.000025021447,0.0023327987,0.000614557,0.000021631058,0.0013844809,0.2627492],"genre_scores_gemma":[7.9911126e-7,0.00043061454,0.044426788,0.00013837896,0.0014782662,0.00037840763,0.000584999,0.00032642845,0.95223534],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988119,0.000011768379,0.00028234802,0.00033235992,0.00022966637,0.00033195168],"domain_scores_gemma":[0.9992188,0.00020248402,0.0000406578,0.00042136677,0.0000465635,0.000070131566],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017199872,0.0003767493,0.00031409334,0.00028489632,0.00006371542,0.000067446614,0.0002452976,0.0002812672,0.0002807259],"category_scores_gemma":[0.000027786287,0.0003897788,0.00013923967,0.00007364396,0.000014088815,0.00006427166,0.000053386644,0.00016827662,0.00058232795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049503014,0.000002664215,4.0469846e-8,0.00008220444,0.00009978137,0.0000031083227,0.000005027679,0.5264333,0.0000011248195,0.00074013864,0.47207126,0.0005564051],"study_design_scores_gemma":[0.00024432945,0.000055198972,3.8038817e-7,0.00012622811,0.000056413868,3.3956366e-7,0.0000015227154,0.56199694,0.0002677802,0.0005621295,0.43636796,0.00032079598],"about_ca_topic_score_codex":0.0000011418753,"about_ca_topic_score_gemma":0.000004749241,"teacher_disagreement_score":0.68948615,"about_ca_system_score_codex":0.00036711709,"about_ca_system_score_gemma":0.00005059989,"threshold_uncertainty_score":0.9998554},"labels":[],"label_agreement":null},{"id":"W4385246239","doi":"10.1109/pcic42668.2022.10181295","title":"Integrating Renewable Energy Behind the Meter in Upstream Oil and Gas Operations - Part I","year":2022,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algonquin College","funders":"","keywords":"Renewable energy; Greenhouse gas; Upstream (networking); Environmental economics; Fossil fuel; Electricity; Metre; Environmental science; Engineering; Electrical engineering; Economics; Telecommunications; Waste management","score_opus":0.008160416550073844,"score_gpt":0.18263003360659902,"score_spread":0.17446961705652517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385246239","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30831248,0.0009589582,0.011769204,0.0042670635,0.0017949073,0.000110499874,0.000015237565,0.00060407555,0.6721676],"genre_scores_gemma":[0.9758626,0.00015826931,0.001215421,0.00040222844,0.00009939305,0.00029904157,0.000020508824,0.000027463679,0.02191507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994624,0.00003994786,0.00013745642,0.00011495103,0.00009804334,0.00014715552],"domain_scores_gemma":[0.99974924,0.000037781527,0.00000591773,0.00017996588,0.000005238116,0.000021855101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016779115,0.00008500741,0.000073334944,0.000065083324,0.0001454528,0.000051329574,0.000114053924,0.000012586349,0.00057052716],"category_scores_gemma":[0.000009262865,0.00006392679,0.000017288081,0.00012371839,0.000012533941,0.000076511744,0.00014104888,0.000091239126,0.0000018845788],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.0872525e-7,0.000009056674,0.0002035438,0.0000026296661,0.000017995111,0.000002774801,0.00026733582,0.97868586,0.00020721421,0.002536434,0.01217285,0.0058934744],"study_design_scores_gemma":[0.00021306811,0.000024648962,0.00009817231,0.000006900651,0.000012144694,0.000006674837,0.001496717,0.6160816,0.0020157574,0.00025856867,0.3796213,0.00016447037],"about_ca_topic_score_codex":0.0038039926,"about_ca_topic_score_gemma":0.020918787,"teacher_disagreement_score":0.66755015,"about_ca_system_score_codex":0.000060991144,"about_ca_system_score_gemma":0.000006076782,"threshold_uncertainty_score":0.9969469},"labels":[],"label_agreement":null},{"id":"W4385328825","doi":"10.5281/zenodo.8192914","title":"160 Hours of Labeled Power Consumption Dataset of Computer","year":2023,"lang":"en","type":"paratext","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Power consumption; Computer science; Consumption (sociology); Power (physics); Sociology","score_opus":0.03506974777963966,"score_gpt":0.243890285309327,"score_spread":0.20882053752968732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385328825","genre_codex":"other","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049125183,0.001974847,0.09463406,0.00034072265,0.013952658,0.0040377663,0.10922885,0.007066751,0.7196392],"genre_scores_gemma":[0.22624023,0.009553032,0.003571943,0.00026124224,0.0021559368,7.041205e-7,0.6887796,0.026610203,0.042827122],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983701,0.00015289715,0.0004573474,0.00031783746,0.00040350918,0.0002983083],"domain_scores_gemma":[0.9987851,0.000024961053,0.00016187225,0.0006702432,0.00026763655,0.00009019117],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004064544,0.00021794216,0.0003278111,0.00047203345,0.00020720038,0.00013196623,0.00095515046,0.00013069357,0.03124429],"category_scores_gemma":[0.000059447713,0.0002499308,0.00006149416,0.0004626085,0.00013058652,0.00011079383,0.0011133949,0.00027969756,0.048197474],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001586175,0.000039416092,5.688818e-7,0.00052771386,0.00019839082,0.000005300728,0.00011652023,0.031171924,0.0007298228,0.00013956954,0.9631551,0.0038998006],"study_design_scores_gemma":[0.0003602807,0.00010986046,0.00024480757,0.00015515054,0.000033112836,0.0000073457604,0.000023892184,0.00276554,0.0006729033,0.0000037066372,0.99540764,0.00021576222],"about_ca_topic_score_codex":0.000015282358,"about_ca_topic_score_gemma":3.483524e-7,"teacher_disagreement_score":0.67681205,"about_ca_system_score_codex":0.00011451251,"about_ca_system_score_gemma":0.0000024173746,"threshold_uncertainty_score":0.9999953},"labels":[],"label_agreement":null},{"id":"W4385336207","doi":"10.1016/j.segan.2023.101113","title":"Flexibility: Literature review on concepts, modeling, and provision method in smart grid","year":2023,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Flexibility (engineering); Smart grid; Computer science; Risk analysis (engineering); Demand response; Distributed generation; Electric power system; Grid; Renewable energy; Systems engineering; Distributed computing; Engineering; Business; Power (physics); Electricity; Economics","score_opus":0.008103705424931357,"score_gpt":0.2564113881544691,"score_spread":0.24830768272953777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385336207","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05692309,0.7377211,0.17448056,0.0027101235,0.003679855,0.0021968968,0.000019276027,0.0030545015,0.019214613],"genre_scores_gemma":[0.395465,0.5928809,0.00090919295,0.0017553166,0.0011355607,0.00045978167,0.00030344483,0.00017139435,0.006919413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983322,0.00009826318,0.00031962295,0.0004630542,0.00016619715,0.0006206767],"domain_scores_gemma":[0.9993595,0.00008624914,0.000026884441,0.00034466435,0.000059545782,0.00012317761],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00086352206,0.00029205787,0.00037452768,0.00023670895,0.00010297189,0.000094421164,0.00011764061,0.0001609596,0.000009316493],"category_scores_gemma":[0.000042052594,0.0002610391,0.00004910226,0.0010115973,0.000029584018,0.00018920406,0.00018636687,0.00029945295,0.0000011775144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017201217,0.0000108889835,0.000066037,0.0013188027,0.000023659039,0.00015039388,0.00007269205,0.942442,0.0000016667925,0.013602505,0.014968439,0.0273257],"study_design_scores_gemma":[0.00030923358,0.00006699275,0.00010960899,0.0013956074,0.000018300201,0.000005305133,0.00016511569,0.8785782,0.0000097650845,0.0013149924,0.117755964,0.0002709025],"about_ca_topic_score_codex":0.000107833745,"about_ca_topic_score_gemma":0.000037142756,"teacher_disagreement_score":0.3385419,"about_ca_system_score_codex":0.00009958963,"about_ca_system_score_gemma":0.000014844626,"threshold_uncertainty_score":0.9999842},"labels":[],"label_agreement":null},{"id":"W4385454382","doi":"10.32920/23811216","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Energy storage; Computer science; Smart grid; Environmental science; Business; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.01602422682923109,"score_gpt":0.19550603314723525,"score_spread":0.17948180631800414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385454382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33612397,0.00025148696,0.6598299,0.000019402001,0.0011107135,0.00075167936,0.00011200615,0.00061732106,0.0011835205],"genre_scores_gemma":[0.9990215,0.00008744476,0.00018280688,0.000011974342,0.00007529971,0.00018528105,0.00003027618,0.000092259725,0.0003131616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878246,0.00018980002,0.00032656518,0.00021563287,0.00026131445,0.00022421475],"domain_scores_gemma":[0.998971,0.0001748937,0.000077006174,0.00065617077,0.000055307675,0.0000656478],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004251385,0.00030655126,0.00056041253,0.0002230052,0.000059198297,0.0000686605,0.00027150667,0.00017425315,0.000019748448],"category_scores_gemma":[0.0000075759676,0.00028364177,0.00006691628,0.00009485352,0.00007121622,0.00007022741,0.00014982703,0.0007893897,0.000005738946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052024337,0.000022078284,0.00035967957,0.0019549353,0.0009806937,0.000024971814,0.0005581317,0.9937866,0.0013483051,0.0000228098,0.0008695465,0.000020257026],"study_design_scores_gemma":[0.0024393694,0.00017636568,0.021756377,0.0012263043,0.0006418936,0.000010971779,0.0022873604,0.9656893,0.004335869,0.00011203443,0.0004081647,0.00091597164],"about_ca_topic_score_codex":0.006086685,"about_ca_topic_score_gemma":0.0011336985,"teacher_disagreement_score":0.6628975,"about_ca_system_score_codex":0.00009934907,"about_ca_system_score_gemma":0.000023214929,"threshold_uncertainty_score":0.99996156},"labels":[],"label_agreement":null},{"id":"W4385462724","doi":"10.32920/23811216.v1","title":"Transactive control of a residential community with solar photovoltaic and battery storage systems","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto and Region Conservation Authority; Toronto Metropolitan University","funders":"","keywords":"Photovoltaic system; Distributed generation; Environmental economics; Energy storage; Computer science; Smart grid; Environmental science; Business; Renewable energy; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.01602422682923109,"score_gpt":0.19550603314723525,"score_spread":0.17948180631800414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385462724","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33612397,0.00025148696,0.6598299,0.000019402001,0.0011107135,0.00075167936,0.00011200615,0.00061732106,0.0011835205],"genre_scores_gemma":[0.9990215,0.00008744476,0.00018280688,0.000011974342,0.00007529971,0.00018528105,0.00003027618,0.000092259725,0.0003131616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878246,0.00018980002,0.00032656518,0.00021563287,0.00026131445,0.00022421475],"domain_scores_gemma":[0.998971,0.0001748937,0.000077006174,0.00065617077,0.000055307675,0.0000656478],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004251385,0.00030655126,0.00056041253,0.0002230052,0.000059198297,0.0000686605,0.00027150667,0.00017425315,0.000019748448],"category_scores_gemma":[0.0000075759676,0.00028364177,0.00006691628,0.00009485352,0.00007121622,0.00007022741,0.00014982703,0.0007893897,0.000005738946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052024337,0.000022078284,0.00035967957,0.0019549353,0.0009806937,0.000024971814,0.0005581317,0.9937866,0.0013483051,0.0000228098,0.0008695465,0.000020257026],"study_design_scores_gemma":[0.0024393694,0.00017636568,0.021756377,0.0012263043,0.0006418936,0.000010971779,0.0022873604,0.9656893,0.004335869,0.00011203443,0.0004081647,0.00091597164],"about_ca_topic_score_codex":0.006086685,"about_ca_topic_score_gemma":0.0011336985,"teacher_disagreement_score":0.6628975,"about_ca_system_score_codex":0.00009934907,"about_ca_system_score_gemma":0.000023214929,"threshold_uncertainty_score":0.99996156},"labels":[],"label_agreement":null},{"id":"W4385466350","doi":"10.1007/978-3-031-35233-1_6","title":"The Blockchain-Based Competitive Market for Peer-to-Peer Energy Token Trading Using Demurrage Mechanism","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Blockchain; Peer-to-peer; Security token; Business; Energy market; Industrial organization; Computer science; Commerce; Computer security; Distributed computing; Renewable energy; Engineering; Electrical engineering","score_opus":0.013818422818426504,"score_gpt":0.19879195108862574,"score_spread":0.18497352827019925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466350","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00093348575,0.0023328778,0.40865004,0.017719312,0.007163517,0.00140885,0.00068153633,0.008118464,0.5529919],"genre_scores_gemma":[0.10601554,0.00040333328,0.0041958783,0.0008360628,0.0010780917,0.00068919617,0.00018426278,0.0008640646,0.88573354],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99784666,0.000018431498,0.0004386931,0.0006155021,0.00038106597,0.00069966016],"domain_scores_gemma":[0.9986207,0.0003081253,0.00011029328,0.00063871936,0.00020071071,0.00012144118],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036643507,0.0006272317,0.00057724107,0.0009434529,0.00038055406,0.00005044745,0.00057838275,0.0008536814,0.000049744416],"category_scores_gemma":[0.00004806709,0.0005958711,0.0001549657,0.00023342542,0.00017815651,0.000017750657,0.00027489095,0.00031679458,0.0000048913876],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000242123,0.000004681385,0.0000012061288,0.000049271766,0.00044140653,0.000058428945,0.000014852872,0.012157951,0.00013806079,0.9644976,0.0061739995,0.016438326],"study_design_scores_gemma":[0.00037808434,0.00009202572,0.0000014087547,0.00012212065,0.00013146772,0.000015163426,0.000037413552,0.2172406,0.0016236596,0.08279997,0.6969715,0.00058660394],"about_ca_topic_score_codex":0.00013777163,"about_ca_topic_score_gemma":0.0015344655,"teacher_disagreement_score":0.88169765,"about_ca_system_score_codex":0.00018705508,"about_ca_system_score_gemma":0.0000358555,"threshold_uncertainty_score":0.9996493},"labels":[],"label_agreement":null},{"id":"W4385466425","doi":"10.1007/978-3-031-35233-1_8","title":"Robust Optimization-Based Decentralized Peer-to-Peer Energy Trading for Prosumers","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Peer-to-peer; Economic shortage; Upstream (networking); Business; Microgrid; Energy market; Environmental economics; Computer science; Distributed computing; Economics; Engineering; Renewable energy; Computer network; Control (management); Artificial intelligence","score_opus":0.018863236118735204,"score_gpt":0.19337089375882097,"score_spread":0.17450765764008577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466425","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001317951,0.0007508728,0.9021884,0.0064051226,0.0016119713,0.00042386577,0.00016478897,0.003828931,0.08461283],"genre_scores_gemma":[0.0053474098,0.00085478235,0.023640057,0.0006369671,0.00036064137,0.001014227,0.001705772,0.0007970506,0.9656431],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980316,0.000006853786,0.0004199236,0.00064018276,0.00031486218,0.00058657536],"domain_scores_gemma":[0.99897575,0.000082169594,0.000086513515,0.00051882246,0.00019929641,0.00013744038],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001372607,0.0005586412,0.0005663675,0.0012841673,0.00013347196,0.00003956256,0.000362707,0.0009359353,0.00013176854],"category_scores_gemma":[0.000044146822,0.00063353474,0.00012535455,0.00029322685,0.00012655747,0.00005152636,0.000114972994,0.00019264949,0.000007898563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017985365,0.000005883105,0.0000055696087,0.0000683858,0.00026956777,0.000022354927,0.000006983079,0.70301974,0.000011166477,0.26300067,0.019935846,0.013635848],"study_design_scores_gemma":[0.0006123024,0.000064005035,8.1457773e-7,0.000085044616,0.00011511121,0.0000044121844,0.0000074708146,0.32216805,0.00038154403,0.0053182347,0.6706726,0.00057043554],"about_ca_topic_score_codex":0.00012856533,"about_ca_topic_score_gemma":0.0008124083,"teacher_disagreement_score":0.88103026,"about_ca_system_score_codex":0.0001447232,"about_ca_system_score_gemma":0.00003867323,"threshold_uncertainty_score":0.9996116},"labels":[],"label_agreement":null},{"id":"W4385466581","doi":"10.1007/978-3-031-35233-1_5","title":"Fully Decentralized and Competitive Hybrid Retail and Local Electricity Market Using Peer-to-Peer Energy Trading","year":2023,"lang":"en","type":"book-chapter","venue":"Green energy and technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Clearance; Peer-to-peer; Business; Smart grid; Electricity; Industrial organization; Electricity market; Profit (economics); Prosumer; Dual (grammatical number); Energy market; Upstream (networking); Commerce; Microeconomics; Renewable energy; Economics; Computer science; Telecommunications; Engineering; Distributed computing","score_opus":0.011817942215350583,"score_gpt":0.1884782016812372,"score_spread":0.1766602594658866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385466581","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03093413,0.024137769,0.34942806,0.010775454,0.0037056757,0.0011882825,0.0005267601,0.01038913,0.5689147],"genre_scores_gemma":[0.5652112,0.013136827,0.0032266765,0.0007097657,0.00054779614,0.00011656854,0.0002685416,0.00077960925,0.41600305],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790186,0.000022989505,0.000395896,0.0007296044,0.0003219508,0.00062770897],"domain_scores_gemma":[0.99914896,0.0000924915,0.000085349726,0.00036437286,0.00012248696,0.0001863292],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020098014,0.00061075756,0.00073811255,0.0011141102,0.00015510614,0.00004957898,0.00022975048,0.0006425124,0.00008560678],"category_scores_gemma":[0.000030143778,0.0006896611,0.00006065,0.00024649996,0.0003438813,0.00007555422,0.00036733583,0.00039205942,0.0000025562024],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006840838,0.00000987676,0.0001171107,0.00012396146,0.0007937046,0.00052161,0.000028755907,0.0012772366,0.00016856051,0.8667194,0.0062767873,0.12389458],"study_design_scores_gemma":[0.00087227166,0.00017028363,0.00010858133,0.0002252023,0.0002727005,0.0003638671,0.000039032875,0.07565911,0.0013593344,0.039844047,0.87992316,0.0011623986],"about_ca_topic_score_codex":0.0003765679,"about_ca_topic_score_gemma":0.0010784892,"teacher_disagreement_score":0.8736464,"about_ca_system_score_codex":0.00015104575,"about_ca_system_score_gemma":0.000023633585,"threshold_uncertainty_score":0.99955547},"labels":[],"label_agreement":null},{"id":"W4385477867","doi":"10.1109/cai54212.2023.00046","title":"Home Energy Management with V2X Capability using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Electricity; Computer science; Energy management; Control (management); Electricity generation; Home automation; Energy management system; Load management; Electric power system; Energy (signal processing); Power (physics); Engineering; Artificial intelligence; Telecommunications; Electrical engineering","score_opus":0.010275081732194082,"score_gpt":0.190971900949268,"score_spread":0.18069681921707392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385477867","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41156664,0.000045626268,0.39158013,0.00006945648,0.0008532924,0.00028951268,5.934547e-7,0.004891145,0.1907036],"genre_scores_gemma":[0.9916989,0.00007477291,0.0020452025,0.000066063556,0.000079077225,0.000056558274,0.000018837949,0.00006156441,0.005899032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875206,0.00001823672,0.0002173453,0.0002548967,0.0003144975,0.0004429956],"domain_scores_gemma":[0.9995103,0.00001871003,0.000021397782,0.00035666185,0.000020091813,0.00007285448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018538779,0.00020493157,0.00015784115,0.00023927962,0.000093551185,0.000045319975,0.00015528091,0.00003622218,0.00018640155],"category_scores_gemma":[0.0000023883879,0.00018421508,0.00004251041,0.00066104264,0.000026158015,0.00012776219,0.00015080135,0.00008891964,0.0001008839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056456606,0.000005317334,0.0011165389,0.000082565515,0.00014064583,0.000034907593,0.000049094462,0.98922956,0.000107245076,0.00633081,0.0012208254,0.0016768674],"study_design_scores_gemma":[0.00039077364,0.000040950967,0.0040848767,0.000031298503,0.000037719314,0.00000256702,0.00027133373,0.93386495,0.00073033606,0.00009323937,0.060103185,0.00034877408],"about_ca_topic_score_codex":0.00013565457,"about_ca_topic_score_gemma":0.000043651962,"teacher_disagreement_score":0.58013225,"about_ca_system_score_codex":0.00021298532,"about_ca_system_score_gemma":0.000004791082,"threshold_uncertainty_score":0.7512073},"labels":[],"label_agreement":null},{"id":"W4385520967","doi":"10.20944/preprints202308.0281.v1","title":"Towards Feasible Solutions for Load Monitoring in Quebec Residences","year":2023,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Exploit; Implementation; Identification (biology); Context (archaeology); Computer science; Risk analysis (engineering); Work (physics); Data science; Smart meter; Operations research; Management science; Engineering; Computer security; Smart grid; Software engineering; Business","score_opus":0.21542096625688445,"score_gpt":0.34961079630635256,"score_spread":0.1341898300494681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385520967","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9641416,0.0008080472,0.006627008,0.00093191233,0.01147653,0.0016581513,0.000043755466,0.0027245982,0.011588404],"genre_scores_gemma":[0.98794574,0.00075159763,0.0010873884,0.00000896876,0.0008736917,0.002128012,0.000033275945,0.00014449719,0.007026848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99721473,0.00005272979,0.0006174816,0.0008539876,0.00045239902,0.0008086542],"domain_scores_gemma":[0.9983612,0.00011828378,0.00009257625,0.0012033848,0.00010902318,0.00011555928],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011554877,0.0004254954,0.0004653804,0.000415081,0.00010751908,0.00006677753,0.000870536,0.00034107134,0.00008047647],"category_scores_gemma":[0.00036763772,0.0005221074,0.00022081337,0.00033823287,0.00004882306,0.00017293672,0.002199942,0.0006711995,0.0006973686],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012664199,0.000029395758,0.13911496,0.00063890597,0.00016268312,0.00001544562,0.0006063289,0.8566015,0.0006989703,0.00059795636,0.0008844681,0.00063676754],"study_design_scores_gemma":[0.00051511766,0.000009862554,0.93725693,0.0011265659,0.00008868317,0.0000010323504,0.00047285485,0.025694128,0.015999945,0.006608273,0.011243694,0.0009829262],"about_ca_topic_score_codex":0.03100872,"about_ca_topic_score_gemma":0.01993859,"teacher_disagreement_score":0.83090734,"about_ca_system_score_codex":0.0014642926,"about_ca_system_score_gemma":0.00025722172,"threshold_uncertainty_score":0.9997231},"labels":[],"label_agreement":null},{"id":"W4385552411","doi":"10.21926/jept.2303026","title":"Volt-Var Control for Utility-Scale Solar PV Plants to Downsize SVCs and Curtailment Effects","year":2023,"lang":"en","type":"article","venue":"Journal of Energy and Power Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Morgan Solar (Canada)","funders":"","keywords":"Photovoltaic system; Overvoltage; AC power; Voltage; Compensation (psychology); Voltage regulation; Grid; Voltage optimisation; Photovoltaics; Volt; Electrical engineering; Automotive engineering; Control theory (sociology); Computer science; Engineering; Control (management); Mathematics","score_opus":0.0036569496760615137,"score_gpt":0.19664799095630703,"score_spread":0.19299104128024552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385552411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89635384,0.0018961644,0.096039,0.0024538857,0.002135611,0.00021174751,0.000017278418,0.0003373877,0.0005551059],"genre_scores_gemma":[0.9980535,0.00046595142,0.0009822885,0.00022000723,0.000110219546,0.000028353932,0.0000017461089,0.000023902743,0.00011403208],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917084,0.00001622177,0.00027145763,0.00014017451,0.00010639975,0.00029488746],"domain_scores_gemma":[0.99950325,0.00013484512,0.000056926747,0.00015935155,0.000044198838,0.00010141103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024137596,0.00015259521,0.0003162378,0.0004698444,0.00005845003,0.000018312749,0.00014497052,0.00016895638,0.000008164079],"category_scores_gemma":[0.000061016166,0.00013563935,0.00004963909,0.00020912403,0.000044884324,0.00006633963,0.00006724548,0.0001318773,0.0000029837172],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002052589,0.00047271812,0.025844561,0.0011630835,0.004569694,0.0012719135,0.0013824737,0.15190487,0.08111693,0.07237811,0.36795872,0.28988433],"study_design_scores_gemma":[0.004054135,0.0011938342,0.00830044,0.00014754527,0.00011657751,0.00016322146,0.00018911358,0.013713809,0.023113461,0.006392783,0.9422038,0.00041126698],"about_ca_topic_score_codex":0.0000028135198,"about_ca_topic_score_gemma":0.000019101733,"teacher_disagreement_score":0.5742451,"about_ca_system_score_codex":0.000025114941,"about_ca_system_score_gemma":0.000007879464,"threshold_uncertainty_score":0.5531212},"labels":[],"label_agreement":null},{"id":"W4385579171","doi":"10.1007/978-3-030-97940-9_65","title":"Machine Learning to Facilitate the Integration of Renewable Energies into the Grid","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Renewable energy; Grid; Production (economics); Electricity; Environmental economics; Environmental science; Computer science; Process engineering; Industrial engineering; Engineering; Meteorology; Electrical engineering; Economics; Geography; Microeconomics","score_opus":0.03148595388371271,"score_gpt":0.20446315609419097,"score_spread":0.17297720221047824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385579171","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013991889,0.00051259925,0.010198024,0.00073232315,0.0015215386,0.0002877947,0.000013052422,0.00068940717,0.98590535],"genre_scores_gemma":[0.004904386,0.0011564514,0.0003479836,0.00007529685,0.00022840954,0.000052444262,0.00008124618,0.00009426496,0.9930595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904984,0.000018398434,0.00030844964,0.00018832275,0.0002708045,0.00016415659],"domain_scores_gemma":[0.9992499,0.00015718084,0.00004689601,0.0004705801,0.000045986504,0.000029472212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032752595,0.0002645408,0.00022606747,0.00015592828,0.00009202315,0.00003872872,0.0003647823,0.00008674924,0.00020815938],"category_scores_gemma":[0.000044604552,0.00014898466,0.00010685598,0.00008795177,0.000043526,0.000044784392,0.00021369894,0.00028135758,0.00021942271],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036219244,7.6855974e-7,0.0000013337171,0.0000366692,0.00012329528,0.0000012817418,0.0011898553,0.929446,0.00023067437,0.038609497,0.0249299,0.0054271286],"study_design_scores_gemma":[0.00005302144,0.000036093454,0.000014582009,0.0000854428,0.0000420446,4.3892786e-7,0.0003511503,0.0439393,0.000845557,0.0030098185,0.9514144,0.00020817442],"about_ca_topic_score_codex":0.0027645824,"about_ca_topic_score_gemma":0.0060539707,"teacher_disagreement_score":0.92648447,"about_ca_system_score_codex":0.00007487442,"about_ca_system_score_gemma":0.000007771375,"threshold_uncertainty_score":0.6075418},"labels":[],"label_agreement":null},{"id":"W4385587924","doi":"10.1007/978-3-030-97940-9_11","title":"A PDE-Based Aggregate Power Tracking Control of Heterogeneous TCL Populations","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Thermostat; Control theory (sociology); Aggregate (composite); Stability (learning theory); Tracking (education); Domain (mathematical analysis); Nonlinear system; Linearization; Partial differential equation; Mathematics; Power (physics); Scheme (mathematics); Control (management); Computer science; Engineering; Mathematical analysis; Physics","score_opus":0.027254481687782037,"score_gpt":0.2139682048349396,"score_spread":0.18671372314715756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385587924","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00052077026,0.0006581507,0.10374794,0.00014397234,0.003331437,0.00076792354,0.00018128277,0.0025640053,0.88808453],"genre_scores_gemma":[0.7905729,0.00005002861,0.00064362853,0.00014068896,0.00017838075,0.00004132715,0.0001349092,0.00038441937,0.20785373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998687,0.000007078989,0.00048571752,0.00025858925,0.00029818714,0.00026340186],"domain_scores_gemma":[0.999205,0.000058076712,0.0001030355,0.000501658,0.00005980009,0.000072428746],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000086338085,0.00036567036,0.00044622063,0.00036008656,0.000032888835,0.000026427037,0.00019558507,0.00022053778,0.0008298366],"category_scores_gemma":[0.000011142701,0.00038703397,0.00027363494,0.000051828676,0.000031685682,0.000040369607,0.000033377164,0.00018104087,0.00025377527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070355336,0.000006421585,0.000020597881,0.00009675745,0.00032378445,0.000060005725,0.000011941505,0.95460296,0.000074480406,0.04209015,0.0016794971,0.001026357],"study_design_scores_gemma":[0.0039808895,0.00026225913,0.00081976183,0.0016227139,0.0011203444,0.00002060814,0.000013433994,0.61380124,0.002885857,0.012082078,0.36005047,0.0033403072],"about_ca_topic_score_codex":0.00002182686,"about_ca_topic_score_gemma":0.00013251706,"teacher_disagreement_score":0.7900521,"about_ca_system_score_codex":0.000095869305,"about_ca_system_score_gemma":0.000013775533,"threshold_uncertainty_score":0.99985814},"labels":[],"label_agreement":null},{"id":"W4385625765","doi":"10.1109/icaeca56562.2023.10200287","title":"A Futuristic Review on Sustainable Energy Grid","year":2023,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Smart grid; Computer science; Renewable energy; Grid; Intermittent energy source; Distributed computing; Distributed generation; Load balancing (electrical power); Energy consumption; Energy management; Energy (signal processing); Engineering; Electrical engineering","score_opus":0.031242318251739534,"score_gpt":0.2752486921949374,"score_spread":0.24400637394319788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385625765","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[6.770926e-10,0.8994123,0.00045767197,0.00002033226,0.0015377348,0.00041368036,0.0000075532275,0.0014590572,0.09669171],"genre_scores_gemma":[1.602648e-8,0.93518984,0.000023625964,0.00020725401,0.001017795,0.00078325917,0.00021494862,0.000244157,0.062319122],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99806887,0.000051218343,0.00061802985,0.00039247912,0.00027759685,0.0005917954],"domain_scores_gemma":[0.99881214,0.0001433744,0.00007042158,0.0008338646,0.000029894492,0.000110316985],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00025762097,0.0005937259,0.0016618301,0.00035361067,0.000045359284,0.000043554977,0.00046305187,0.00016875235,0.00043118402],"category_scores_gemma":[0.000063050444,0.0004700648,0.00045651075,0.0009349548,0.000011860227,0.00004312146,0.00017638937,0.0002570637,0.0020438677],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.0358014e-8,0.0000046016917,1.5547892e-9,0.2237171,0.0001759537,0.0001223587,4.4562577e-7,0.0007548083,3.2788458e-10,0.0140120825,0.46663228,0.29458028],"study_design_scores_gemma":[0.00002823862,0.000014749162,3.6172352e-8,0.05625794,0.0005766526,0.0000057829084,0.0000032913651,0.0001300681,4.476001e-8,0.000045299064,0.9424887,0.00044919978],"about_ca_topic_score_codex":0.000044021213,"about_ca_topic_score_gemma":0.000009854628,"teacher_disagreement_score":0.47585642,"about_ca_system_score_codex":0.00042851624,"about_ca_system_score_gemma":0.0000484409,"threshold_uncertainty_score":0.9997751},"labels":[],"label_agreement":null},{"id":"W4385626999","doi":"10.1109/access.2023.3303204","title":"Efficient Energy Management for Household: Optimization-Based Integration of Distributed Energy Resources in Smart Grid","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"King Saud University","keywords":"Smart grid; Renewable energy; Environmental economics; Computer science; Knapsack problem; Grid; Population; Variable renewable energy; Energy management; Energy storage; Energy (signal processing); Economics; Engineering; Algorithm; Mathematics; Electrical engineering","score_opus":0.020191268301705173,"score_gpt":0.23545748303338535,"score_spread":0.21526621473168017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385626999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05550457,0.000040215975,0.94138664,0.000074685006,0.0012935044,0.00019865387,0.000103156126,0.00049935665,0.0008991972],"genre_scores_gemma":[0.99732924,0.00006020712,0.0013035274,0.00006663982,0.00012258394,0.00044709025,0.00051893515,0.000058739006,0.00009301593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879634,0.000027657414,0.0003906581,0.00025074967,0.00023757857,0.00029703372],"domain_scores_gemma":[0.99942183,0.00010014658,0.00006671282,0.00032245435,0.000043527227,0.000045336314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017849264,0.00018469317,0.00020538148,0.00060110324,0.00004293918,0.000062040024,0.00038577363,0.00006482063,0.000009958035],"category_scores_gemma":[0.000014033422,0.00019271656,0.000070199014,0.0012176173,0.000024499317,0.00007691909,0.000061955696,0.000041793963,0.0000011798379],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025405645,0.00004464936,0.00019324955,0.00009985611,0.00004314665,0.0000063599196,0.000025473697,0.9891962,0.00010100725,0.000870601,0.007670558,0.0017235228],"study_design_scores_gemma":[0.0006423843,0.000018929726,0.0019949456,0.000074375595,0.000023077864,1.0747893e-7,0.000027014727,0.97869676,0.008397759,0.000047744055,0.0098877745,0.0001891141],"about_ca_topic_score_codex":0.00024578857,"about_ca_topic_score_gemma":0.00024190644,"teacher_disagreement_score":0.9418247,"about_ca_system_score_codex":0.00013164239,"about_ca_system_score_gemma":0.0000075883363,"threshold_uncertainty_score":0.7858753},"labels":[],"label_agreement":null},{"id":"W4385627093","doi":"10.1109/tsg.2023.3302520","title":"Novel Incentive-Based Multi-Level Framework for Flexibility Provision in Smart Grids","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"News aggregator; Smart grid; Flexibility (engineering); Incentive; Computer science; Schedule; Grid; Electricity; Demand response; Electric power system; Reliability engineering; Prosumer; Risk analysis (engineering); Environmental economics; Engineering; Power (physics); Business; Renewable energy; Economics; Microeconomics; Electrical engineering","score_opus":0.07637732876544913,"score_gpt":0.2941756082613052,"score_spread":0.21779827949585606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385627093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06322137,0.000012616832,0.9277268,0.00024878897,0.0062068314,0.000986517,0.00034459095,0.0011598462,0.00009262249],"genre_scores_gemma":[0.9537812,0.00003546566,0.044066574,0.00017919576,0.00023169958,0.0011535464,0.00007648168,0.00013901327,0.00033682337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978766,0.000041593466,0.00051231193,0.0005814287,0.00034160822,0.00064644637],"domain_scores_gemma":[0.998723,0.00038062286,0.000042415842,0.0006499013,0.00006814927,0.00013596383],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00049542414,0.00037506863,0.00034341228,0.0006115387,0.00018376013,0.000053670556,0.00028941524,0.00023528573,0.00005626166],"category_scores_gemma":[0.00003282083,0.00040750683,0.00023154083,0.0011839457,0.00006410777,0.00020577796,0.000004316776,0.00048231357,0.00018696798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011877621,0.00041866748,0.0003044876,0.0001958127,0.00006666498,0.000005455748,0.00012594368,0.98604584,0.0021596227,0.00011045843,0.0010106185,0.0094376365],"study_design_scores_gemma":[0.0029356894,0.00017113946,0.025146134,0.00026395216,0.00005448195,0.0000010775886,0.00009493201,0.91817135,0.04119606,0.00019687891,0.011056485,0.00071182597],"about_ca_topic_score_codex":0.00011785358,"about_ca_topic_score_gemma":0.00067926396,"teacher_disagreement_score":0.89055985,"about_ca_system_score_codex":0.00039078403,"about_ca_system_score_gemma":0.000050028793,"threshold_uncertainty_score":0.9998377},"labels":[],"label_agreement":null},{"id":"W4385682033","doi":"10.48550/arxiv.2308.03591","title":"On Data-Driven Modeling and Control in Modern Power Grids Stability: Survey and Perspective","year":2023,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Distributed generation; Renewable energy; Computer science; Grid; Wind power; Control (management); Photovoltaic system; Smart grid; Control engineering; Engineering; Electrical engineering","score_opus":0.12063734411857378,"score_gpt":0.19793814022759304,"score_spread":0.07730079610901926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385682033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8454364,0.000100718426,0.15259853,0.000029052697,0.00034962286,0.00031017847,0.00026949777,0.00027389103,0.00063214306],"genre_scores_gemma":[0.99928653,0.00041114466,0.00004284308,0.00002105693,0.000028388593,0.0000018922987,0.0000902965,0.000059855825,0.000058017165],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99821806,0.00013809791,0.0001792011,0.0010732119,0.00008335065,0.00030805625],"domain_scores_gemma":[0.9985438,0.00022386061,0.00003883819,0.0010162618,0.000068619964,0.00010859471],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048664416,0.00032796233,0.00039769188,0.00034358384,0.000047864185,0.000057612775,0.0004567765,0.00019848754,0.000009287395],"category_scores_gemma":[0.00008583117,0.00040879849,0.000038982682,0.00023678718,0.000069065136,0.00018680375,0.0011923822,0.00054531515,0.000008553062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006451851,0.00002479449,0.013069405,0.00006174355,0.00017870202,0.00008816868,0.0002688224,0.9826135,0.0000058820274,0.0035422815,0.00006250869,0.00001968082],"study_design_scores_gemma":[0.0007353747,0.000022204718,0.013236953,0.000060681694,0.000050283044,3.6324133e-7,0.00046282288,0.97491187,0.0000013165975,0.010154807,0.000005462408,0.00035785983],"about_ca_topic_score_codex":0.0016857962,"about_ca_topic_score_gemma":0.003413304,"teacher_disagreement_score":0.15385014,"about_ca_system_score_codex":0.00040952655,"about_ca_system_score_gemma":0.000031327836,"threshold_uncertainty_score":0.9998364},"labels":[],"label_agreement":null},{"id":"W4385693880","doi":"10.1155/2023/9828275","title":"Retracted: The Network Global Optimal Mapping Approach Utilizing a Discrete Firefly Optimization Algorithm","year":2023,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Firefly algorithm; Firefly protocol; Computer science; Optimization algorithm; Algorithm; Mathematical optimization; Mathematics; Biology","score_opus":0.010710834546479725,"score_gpt":0.22308485777229048,"score_spread":0.21237402322581075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385693880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06494468,0.00028915826,0.93230593,0.00011744943,0.0013435425,0.00015526474,0.000010620406,0.00021307565,0.0006202594],"genre_scores_gemma":[0.68428934,0.00080390536,0.3138046,0.000039031514,0.0008098755,0.000017503611,0.00016019514,0.000047527454,0.000028016742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986991,0.00002454132,0.0005245815,0.00011810117,0.00036307034,0.0002706013],"domain_scores_gemma":[0.99949884,0.00003629795,0.00018776894,0.00013012264,0.00008700993,0.00005993237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035598784,0.00015364098,0.00018939807,0.00006753035,0.00010658404,0.000038476468,0.00017401231,0.00007040547,0.000006858913],"category_scores_gemma":[0.000011037456,0.00012578235,0.00011465412,0.0009625474,0.00002190443,0.00050761143,0.0000041619833,0.0002535239,0.0000024855483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018128632,0.0000071523814,0.0002281498,0.000031657597,0.000089357025,0.000023290828,0.00041909594,0.98739606,0.00004705508,0.000109685396,0.00050688133,0.0111234775],"study_design_scores_gemma":[0.00051506096,0.000038330403,0.08290726,0.00009300589,0.0000666535,0.000012128562,0.0013280115,0.9117717,0.000029573263,0.00012220905,0.0029544989,0.00016155138],"about_ca_topic_score_codex":0.000002119423,"about_ca_topic_score_gemma":0.0000030209585,"teacher_disagreement_score":0.61934465,"about_ca_system_score_codex":0.00010580252,"about_ca_system_score_gemma":0.000017329985,"threshold_uncertainty_score":0.5129255},"labels":[],"label_agreement":null},{"id":"W4385753491","doi":"10.1109/redec58286.2023.10208165","title":"Power Routing Algorithms: A Comparative Study","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"National Council for Scientific Research; Agence Universitaire de la Francophonie","keywords":"Computer science; Tree traversal; Algorithm; Smart grid; Shortest path problem; Distributed computing; Graph; Engineering; Theoretical computer science","score_opus":0.029494884889993495,"score_gpt":0.2668873956034211,"score_spread":0.23739251071342762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385753491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76819086,0.000011606263,0.007050852,0.00003988441,0.00086673035,0.00024861892,0.0000010065773,0.0027877488,0.22080266],"genre_scores_gemma":[0.9974836,0.0000017822216,0.0003238374,0.000019503752,0.000056812973,0.000038110775,0.000002938627,0.000017887622,0.0020554909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941623,0.000012836001,0.00011893005,0.000119795695,0.00013287671,0.00019932562],"domain_scores_gemma":[0.9997538,0.00003003023,0.0000063982825,0.00016495514,0.000011814255,0.000033030356],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012951934,0.00009504103,0.00010953914,0.00009499564,0.000036413992,0.000026901695,0.00009719658,0.0000141330565,0.00020136511],"category_scores_gemma":[0.000004180123,0.00008860709,0.000022435781,0.00040983193,0.0000063397274,0.000062081854,0.00007186085,0.000057134435,0.001076803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019337406,0.00006980676,0.0046692817,0.0000073606366,0.0002772136,0.000057991067,0.0060447077,0.9113304,0.00011156679,0.0015983704,0.075197205,0.00063416036],"study_design_scores_gemma":[0.0005679868,0.00008984409,0.080109365,0.000007939196,0.0000146308375,8.822207e-7,0.020257832,0.88000584,0.00047548432,0.00005292548,0.01809484,0.00032245033],"about_ca_topic_score_codex":0.000016780683,"about_ca_topic_score_gemma":0.000021768386,"teacher_disagreement_score":0.22929275,"about_ca_system_score_codex":0.0000348441,"about_ca_system_score_gemma":0.0000018516431,"threshold_uncertainty_score":0.99970096},"labels":[],"label_agreement":null},{"id":"W4385973020","doi":"10.1016/j.ref.2023.08.002","title":"Impact of residential photovoltaic systems on net load intermittency","year":2023,"lang":"en","type":"article","venue":"Renewable energy focus","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Intermittency; Photovoltaic system; Environmental science; Load profile; Electricity generation; Electricity; Peak load; Automotive engineering; Power (physics); Meteorology; Engineering; Electrical engineering; Geography","score_opus":0.009730742101488079,"score_gpt":0.22360654865706545,"score_spread":0.21387580655557736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385973020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8545673,0.0018822453,0.008050064,0.000023590774,0.006393734,0.00028896297,0.00005421037,0.0026402755,0.1260996],"genre_scores_gemma":[0.99243146,0.0003659987,0.000026126469,0.0000050535646,0.00037393143,0.0000666291,0.000026827225,0.00008506078,0.006618925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835753,0.000042675885,0.00039597112,0.00027906173,0.00042951995,0.00049523334],"domain_scores_gemma":[0.9990978,0.00006343487,0.00006795706,0.00059918105,0.000056385274,0.000115230745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018124883,0.00027252513,0.00034302555,0.00040460008,0.000043952878,0.00004694005,0.0003160467,0.000111176596,0.00009974785],"category_scores_gemma":[0.000030169866,0.0002560798,0.00020407533,0.000795744,0.000027944323,0.00011346708,0.000101901634,0.00008281296,0.000101368336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022330943,0.000020216912,0.00038643915,0.000047185225,0.0002039119,0.000048045626,0.000028098666,0.8870737,0.012701842,0.00020915935,0.098407075,0.0008520027],"study_design_scores_gemma":[0.001784518,0.0007336913,0.014343088,0.0005056547,0.00011164348,0.00002135594,0.00011203707,0.8208008,0.10012207,0.00088718964,0.059456054,0.0011219428],"about_ca_topic_score_codex":0.041929755,"about_ca_topic_score_gemma":0.0015367436,"teacher_disagreement_score":0.13786414,"about_ca_system_score_codex":0.00038957674,"about_ca_system_score_gemma":0.000056285393,"threshold_uncertainty_score":0.99998915},"labels":[],"label_agreement":null},{"id":"W4386028983","doi":"10.3390/s23167288","title":"Towards Feasible Solutions for Load Monitoring in Quebec Residences","year":2023,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Identification (biology); Implementation; Computer science; Electricity; Aggregate (composite); Smart meter; Risk analysis (engineering); Data science; Engineering; Business; Software engineering","score_opus":0.04256402380893445,"score_gpt":0.2656905725245547,"score_spread":0.22312654871562024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386028983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99057484,0.00017184872,0.00036811005,0.00046252416,0.0017669919,0.00018309607,0.000004551192,0.0008002462,0.0056678],"genre_scores_gemma":[0.9933622,0.00014046862,0.00071226433,0.0000052634914,0.00032919899,0.0000898341,0.0000042915894,0.00003058224,0.0053258897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921215,0.000010304713,0.00013213295,0.00012977784,0.0001436814,0.0003719281],"domain_scores_gemma":[0.9997321,0.00005196515,0.000009037745,0.00015161489,0.000020250698,0.00003506614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021292466,0.000088693494,0.000094425035,0.00017164444,0.000056885347,0.000029540948,0.000097961834,0.000040097584,0.000007669631],"category_scores_gemma":[0.00006472452,0.00009796196,0.000039080747,0.000443503,0.000013844221,0.00007947078,0.000040967363,0.00005822152,0.00009701023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027402923,0.0000032679216,0.0012656209,0.00004242152,0.00001580833,0.00000944981,0.0003125478,0.9885115,0.00039738833,0.000740078,0.0065580946,0.0021411085],"study_design_scores_gemma":[0.0010158817,0.000045604385,0.25519115,0.000273775,0.00003596912,0.0000020113473,0.004551444,0.6274831,0.015337385,0.002153983,0.09311212,0.0007975255],"about_ca_topic_score_codex":0.005727587,"about_ca_topic_score_gemma":0.01100859,"teacher_disagreement_score":0.3610283,"about_ca_system_score_codex":0.0002317272,"about_ca_system_score_gemma":0.000024441477,"threshold_uncertainty_score":0.8658436},"labels":[],"label_agreement":null},{"id":"W4386065631","doi":"10.1109/tia.2023.3307347","title":"Resilient Event Detection Algorithm for Non-Intrusive Load Monitoring Under Non-Ideal Conditions Using Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; York University; Polytechnique Montréal","funders":"","keywords":"Computer science; Event (particle physics); Reinforcement learning; Ideal (ethics); Grid; Smart grid; Real-time computing; Algorithm; Data mining; Artificial intelligence; Engineering; Mathematics","score_opus":0.019303920762685924,"score_gpt":0.2760254077934813,"score_spread":0.25672148703079534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386065631","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024218008,0.0000064039828,0.9720904,0.00008344213,0.0011930923,0.0012416409,0.000054204225,0.00076409685,0.00034867055],"genre_scores_gemma":[0.99069595,0.0000352544,0.0024879177,0.000025735515,0.00046467982,0.0050895447,0.00003963933,0.00009160039,0.0010696483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983678,0.000019088284,0.00040053384,0.0003883878,0.0003423501,0.00048187398],"domain_scores_gemma":[0.9991073,0.00012143708,0.00007934965,0.00040902075,0.00013645791,0.00014646241],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018934566,0.0002838697,0.00019492621,0.00040207693,0.00085601455,0.00006377889,0.00017915467,0.00031258035,0.000042729807],"category_scores_gemma":[0.0000030283231,0.0003564237,0.00014998454,0.0010338451,0.000047497735,0.00018277884,0.0000050274566,0.0007652799,0.00012567491],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004985679,0.000038814997,0.0000054938323,0.000031386804,0.00014238837,9.688277e-7,0.00008637126,0.96745384,0.010607144,0.000022826976,0.00028618498,0.0213196],"study_design_scores_gemma":[0.00053549267,0.00006192638,0.00029926223,0.00006664554,0.00012446131,0.00000514019,0.00082430115,0.8899995,0.101144366,0.00007177797,0.0065278993,0.0003391989],"about_ca_topic_score_codex":0.0000751449,"about_ca_topic_score_gemma":0.000016495675,"teacher_disagreement_score":0.9696025,"about_ca_system_score_codex":0.0010459878,"about_ca_system_score_gemma":0.00007019517,"threshold_uncertainty_score":0.9998888},"labels":[],"label_agreement":null},{"id":"W4386066677","doi":"10.1109/smartnets58706.2023.10215762","title":"Appliances Operation Modes Identification Using States Clustering","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Cluster analysis; Identification (biology); Energy conservation; Energy consumption; Computer science; Internet of Things; Energy management; Energy (signal processing); Power consumption; Power (physics); Computer security; Engineering; Artificial intelligence; Electrical engineering","score_opus":0.02850793559779548,"score_gpt":0.24760880142037578,"score_spread":0.2191008658225803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386066677","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39418238,0.000030746054,0.60138875,0.00003727603,0.00047318247,0.00009011492,0.0000012587054,0.00111224,0.0026840107],"genre_scores_gemma":[0.99680287,0.000089206886,0.0022035781,0.000013461585,0.00008170718,0.000028008744,0.000034413068,0.000020400374,0.0007263873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955493,0.0000051094726,0.00012592303,0.00009995519,0.00008914035,0.00012496495],"domain_scores_gemma":[0.9998361,0.000008595314,0.000008601092,0.00011582824,0.000013224398,0.00001767268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009912422,0.00006481705,0.000050357077,0.000088878944,0.00005199559,0.0000793641,0.00006550456,0.000017533072,0.000033602108],"category_scores_gemma":[0.0000027732187,0.000066803324,0.000012985765,0.0002007646,0.0000064461356,0.00021273372,0.000031056577,0.000023313354,0.0001955427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.0990673e-7,0.0000012145534,0.00009873961,0.000027978418,0.000010433255,5.944053e-7,0.000056033456,0.97314954,0.02375671,0.00029150036,0.0010593149,0.0015475488],"study_design_scores_gemma":[0.000043176253,0.0000014486922,0.00088338216,0.0000061719593,0.00000402425,2.775201e-7,0.00020021845,0.9803544,0.017092023,0.00010277241,0.001231168,0.00008093565],"about_ca_topic_score_codex":0.000033103934,"about_ca_topic_score_gemma":0.00004259683,"teacher_disagreement_score":0.6026204,"about_ca_system_score_codex":0.000045224067,"about_ca_system_score_gemma":0.0000017608492,"threshold_uncertainty_score":0.27241606},"labels":[],"label_agreement":null},{"id":"W4386070836","doi":"10.11159/eee23.103","title":"Deep Reinforcement Learning-Based Governor for Pumped Storage Hydropower","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Governor; Hydropower; Reinforcement learning; Computer science; Reinforcement; Artificial intelligence; Engineering; Electrical engineering; Aerospace engineering; Structural engineering","score_opus":0.00565938266256727,"score_gpt":0.18960499314567203,"score_spread":0.18394561048310476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386070836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82324207,0.0007630944,0.16058692,0.0005709069,0.009532585,0.0017796854,0.0000022681897,0.0017409541,0.0017814974],"genre_scores_gemma":[0.9988402,0.000015152052,0.00013263058,0.000019129562,0.00011423583,0.000055686276,3.338265e-7,0.000017790184,0.00080481573],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989344,0.0000019735419,0.00018901133,0.00023409638,0.00030822164,0.00033230084],"domain_scores_gemma":[0.9996335,0.00007936622,0.000049261234,0.000082323895,0.00006878671,0.000086751745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003414253,0.00014967458,0.00018324312,0.00027293919,0.00013454743,0.00014301187,0.00027622184,0.000025104262,3.4838138e-7],"category_scores_gemma":[0.000037117876,0.00011490284,0.000037017293,0.0009481586,0.000060397604,0.00009762528,0.00008876219,0.00012650999,7.423601e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005899368,0.000004217228,0.00015240516,0.00018159676,0.000014684876,3.3904834e-7,0.000021195974,0.99131393,0.00084460044,0.0061122016,0.0008794039,0.00046952232],"study_design_scores_gemma":[0.00023973336,0.000096938784,0.00076808047,0.00011837138,0.000008361334,0.0000015738323,0.0000047010776,0.98947525,0.0013326713,0.000004903734,0.007808997,0.00014040056],"about_ca_topic_score_codex":0.0000045939505,"about_ca_topic_score_gemma":4.7370847e-7,"teacher_disagreement_score":0.17559814,"about_ca_system_score_codex":0.00006381931,"about_ca_system_score_gemma":0.000008300978,"threshold_uncertainty_score":0.4685602},"labels":[],"label_agreement":null},{"id":"W4386214540","doi":"10.1109/iscc58397.2023.10217998","title":"Variational Auto-Encoder Model and Federated Approach for Non-Intrusive Load Monitoring in Smart Homes","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Computer science; Encoder; Sequence (biology); Energy consumption; Point (geometry); State (computer science); Power consumption; Autoencoder; Energy (signal processing); Power (physics); Real-time computing; Data mining; Artificial intelligence; Deep learning; Algorithm; Engineering; Operating system; Mathematics","score_opus":0.017409027688702422,"score_gpt":0.2240530306082367,"score_spread":0.20664400291953428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386214540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22482559,0.00003667197,0.7551435,0.00012495668,0.00047949256,0.00044107082,0.000008246347,0.0007383027,0.018202152],"genre_scores_gemma":[0.9737846,0.000036721576,0.024136335,0.00001905053,0.00013303703,0.0002824047,0.000036565412,0.000036502868,0.001534762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924946,0.0000053026615,0.00015707793,0.00019585204,0.00014669733,0.00024564008],"domain_scores_gemma":[0.9997721,0.000048514597,0.00001080874,0.00009103358,0.0000367828,0.000040809275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016986667,0.0001275985,0.00013149666,0.00014725506,0.000057006906,0.00006026359,0.00006358909,0.000058821544,0.000005818217],"category_scores_gemma":[0.000019019764,0.00013082782,0.00002198288,0.0002606153,0.000008109883,0.00014003829,0.00004393559,0.00006650676,0.000008975563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049452547,0.000009336259,0.0017758181,0.000056874647,0.00004081752,0.0000012313973,0.00018009503,0.9939462,0.00048488547,0.00092922983,0.0021602744,0.00041028083],"study_design_scores_gemma":[0.00046564644,0.0000061392075,0.019109195,0.000008824304,0.0000066252064,4.0658048e-7,0.00013387864,0.97914076,0.00048272283,0.00035644977,0.00013886718,0.00015049941],"about_ca_topic_score_codex":0.00004028851,"about_ca_topic_score_gemma":0.000016334208,"teacher_disagreement_score":0.74895906,"about_ca_system_score_codex":0.00012871833,"about_ca_system_score_gemma":0.000021960903,"threshold_uncertainty_score":0.5335003},"labels":[],"label_agreement":null},{"id":"W4386256938","doi":"10.32920/24050739","title":"Beyond the Net Benefits Test: Optimizing Economic Demand Response","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Market power; Procurement; Market clearing; Demand response; Commission; Economics; Order (exchange); Energy market; Microeconomics; Harm; Economic surplus; Business; Industrial organization; Welfare; Renewable energy; Market economy; Electricity; Finance; Engineering","score_opus":0.01913528671685326,"score_gpt":0.2146364460742091,"score_spread":0.19550115935735585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386256938","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67455995,0.0044647246,0.037162196,0.012580063,0.037730243,0.0030618415,0.00041983204,0.013833823,0.21618733],"genre_scores_gemma":[0.95304054,0.0024967832,0.01160655,0.00081112346,0.0026791552,0.00093720533,0.00021386695,0.00073990674,0.027474858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863595,0.000046654426,0.00037193616,0.00042869514,0.00014124157,0.00037550693],"domain_scores_gemma":[0.9981574,0.00065119704,0.000051355408,0.0010484771,0.000013778231,0.00007781639],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00079431856,0.0003727398,0.000289295,0.00019543123,0.000087746565,0.000202966,0.0006855995,0.00020627613,0.00019736547],"category_scores_gemma":[0.000059457318,0.00031108162,0.000132811,0.00008233052,0.000031522482,0.000059312315,0.001219657,0.00045864348,0.00066978973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011806354,0.0000035331955,0.000107518026,0.000045243094,0.000108431705,0.000008549934,0.00006667635,0.92713255,0.000022120621,0.0008918707,0.07133144,0.00027025398],"study_design_scores_gemma":[0.00027752022,0.000024150699,0.010664628,0.00009642012,0.0001021671,0.000005123349,0.00009998047,0.9666027,0.0008224074,0.0018628694,0.01869846,0.00074357196],"about_ca_topic_score_codex":0.00008579072,"about_ca_topic_score_gemma":0.00019740096,"teacher_disagreement_score":0.2784806,"about_ca_system_score_codex":0.00029303067,"about_ca_system_score_gemma":0.00003615755,"threshold_uncertainty_score":0.99993414},"labels":[],"label_agreement":null},{"id":"W4386257110","doi":"10.32920/24050739.v1","title":"Beyond the Net Benefits Test: Optimizing Economic Demand Response","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Market power; Procurement; Market clearing; Economics; Commission; Order (exchange); Energy market; Microeconomics; Harm; Demand response; Economic surplus; Welfare; Industrial organization; Business; Renewable energy; Market economy; Electricity; Finance; Engineering","score_opus":0.01913528671685326,"score_gpt":0.2146364460742091,"score_spread":0.19550115935735585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386257110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67455995,0.0044647246,0.037162196,0.012580063,0.037730243,0.0030618415,0.00041983204,0.013833823,0.21618733],"genre_scores_gemma":[0.95304054,0.0024967832,0.01160655,0.00081112346,0.0026791552,0.00093720533,0.00021386695,0.00073990674,0.027474858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863595,0.000046654426,0.00037193616,0.00042869514,0.00014124157,0.00037550693],"domain_scores_gemma":[0.9981574,0.00065119704,0.000051355408,0.0010484771,0.000013778231,0.00007781639],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00079431856,0.0003727398,0.000289295,0.00019543123,0.000087746565,0.000202966,0.0006855995,0.00020627613,0.00019736547],"category_scores_gemma":[0.000059457318,0.00031108162,0.000132811,0.00008233052,0.000031522482,0.000059312315,0.001219657,0.00045864348,0.00066978973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011806354,0.0000035331955,0.000107518026,0.000045243094,0.000108431705,0.000008549934,0.00006667635,0.92713255,0.000022120621,0.0008918707,0.07133144,0.00027025398],"study_design_scores_gemma":[0.00027752022,0.000024150699,0.010664628,0.00009642012,0.0001021671,0.000005123349,0.00009998047,0.9666027,0.0008224074,0.0018628694,0.01869846,0.00074357196],"about_ca_topic_score_codex":0.00008579072,"about_ca_topic_score_gemma":0.00019740096,"teacher_disagreement_score":0.2784806,"about_ca_system_score_codex":0.00029303067,"about_ca_system_score_gemma":0.00003615755,"threshold_uncertainty_score":0.99993414},"labels":[],"label_agreement":null},{"id":"W4386382737","doi":"10.2139/ssrn.4559023","title":"Transactive Local Energy Markets Enable Community-Level Resource Coordination Using Individual Rewards","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Transactive memory; Resource (disambiguation); Business; Energy (signal processing); Environmental economics; Natural resource economics; Industrial organization; Environmental resource management; Knowledge management; Computer science; Economics","score_opus":0.03695444822660578,"score_gpt":0.2385656884073308,"score_spread":0.20161124018072502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386382737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035279937,0.0020449013,0.956973,0.0002791407,0.0015469133,0.00021590608,0.00006043005,0.00062580063,0.0029739444],"genre_scores_gemma":[0.9937077,0.002363838,0.00060061924,0.000057293855,0.0007847034,0.000043320153,0.00020352291,0.00028780708,0.0019512051],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946358,0.0007018774,0.0006681385,0.00035779367,0.00083903427,0.002797355],"domain_scores_gemma":[0.998665,0.00017501594,0.00022969134,0.00064319494,0.00013199558,0.00015513289],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.004483648,0.000577531,0.00056961353,0.0007559158,0.00051858387,0.00022262354,0.0011550499,0.0005134706,0.000030041609],"category_scores_gemma":[0.000049908445,0.0006883245,0.0002889834,0.00043440107,0.00008953314,0.00021735452,0.0004735312,0.00929637,0.000011662685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060096918,0.00007630924,0.000020961106,0.00013407739,0.0026011257,0.000015884018,0.00052695745,0.9618915,0.00010662632,0.0049244342,0.0014188638,0.02822318],"study_design_scores_gemma":[0.003645183,0.00047891945,0.0021761793,0.0015253072,0.0022311017,0.0006117303,0.014962289,0.53859705,0.0030252717,0.3982183,0.030972188,0.0035564776],"about_ca_topic_score_codex":0.0011738924,"about_ca_topic_score_gemma":0.0025876125,"teacher_disagreement_score":0.9584277,"about_ca_system_score_codex":0.005188094,"about_ca_system_score_gemma":0.0011777526,"threshold_uncertainty_score":0.9995568},"labels":[],"label_agreement":null},{"id":"W4386445925","doi":"10.1080/01430750.2023.2256332","title":"Optimising a solar-based microgrid system for urban areas: a case study in Edmonton","year":2023,"lang":"en","type":"article","venue":"International Journal of Ambient Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Microgrid; Photovoltaic system; Electricity; Photovoltaics; Fossil fuel; Grid; Environmental economics; Environmental science; Solar energy; Civil engineering; Engineering; Environmental engineering; Waste management; Electrical engineering; Geography; Economics","score_opus":0.014626148660348328,"score_gpt":0.2486404317042783,"score_spread":0.23401428304392996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386445925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9644969,0.00014544815,0.03092301,0.00013904546,0.0038404565,0.00013279077,0.000010158876,0.00013297264,0.00017919972],"genre_scores_gemma":[0.9985187,0.000018783297,0.0007193503,0.000040566356,0.00056359614,0.000040531002,0.0000112942025,0.000039852497,0.00004731595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851674,0.00003907387,0.00059010176,0.00014142274,0.00048021815,0.00023241622],"domain_scores_gemma":[0.9992933,0.00009583808,0.00014423805,0.00013179341,0.0002537415,0.00008107172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049330335,0.0001550785,0.00021817679,0.000957118,0.00003141574,0.000100991376,0.00034539634,0.000041335657,0.000005484202],"category_scores_gemma":[0.000033029813,0.00015548503,0.00014117808,0.00029828504,0.000010552935,0.00016198675,0.00005378112,0.000100533915,0.0000026025955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000839513,0.00015599479,0.0024512513,0.000027705059,0.00030501728,0.008488102,0.0002985268,0.9821562,0.0009862744,0.0001379124,0.002592327,0.0023167327],"study_design_scores_gemma":[0.006337754,0.000488414,0.0030709277,0.0005906472,0.0000997431,0.0021004875,0.005735657,0.9460785,0.010829752,0.00003118302,0.024175115,0.00046185032],"about_ca_topic_score_codex":0.00029708794,"about_ca_topic_score_gemma":0.00034301289,"teacher_disagreement_score":0.036077734,"about_ca_system_score_codex":0.00057661027,"about_ca_system_score_gemma":0.000036222817,"threshold_uncertainty_score":0.6340496},"labels":[],"label_agreement":null},{"id":"W4386537063","doi":"10.1063/5.0162717","title":"A comprehensive review of real-time monitoring and controlling challenges for smart grid application and its probable solution","year":2023,"lang":"en","type":"review","venue":"AIP conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Smart grid; Grid; Distributed computing; Real-time computing; Engineering; Electrical engineering; Geography","score_opus":0.07995533207746794,"score_gpt":0.2959179835174424,"score_spread":0.21596265143997448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386537063","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000029558243,0.99596596,0.0004129962,0.000059573664,0.00017155937,0.0025740825,0.000017389812,0.0003006656,0.00046823805],"genre_scores_gemma":[0.00013560134,0.99678534,0.00042765494,0.000003809237,0.00024578162,0.0022330827,0.000034977733,0.000082666775,0.000051059662],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.99847734,0.0000103752,0.0005962133,0.0004450348,0.00017148384,0.00029955994],"domain_scores_gemma":[0.9990172,0.0001317772,0.00028556274,0.000120205,0.00036967066,0.000075630065],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035384603,0.00038703938,0.0013736881,0.00016301313,0.000062436135,0.000043350952,0.00017339394,0.0001736617,0.000001351951],"category_scores_gemma":[0.00006481333,0.00037885757,0.00010164607,0.0001980171,0.000030705134,0.00016988566,0.00011343075,0.00015347959,0.000009569434],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040435775,0.000009073044,0.0000040430027,0.79248786,0.00029757185,3.505688e-7,0.000109232155,0.0000058407986,0.00042607076,0.0017704382,0.00028903768,0.20459642],"study_design_scores_gemma":[0.00037126165,0.00010138731,0.000024512046,0.21706308,0.0012698318,0.000011418078,0.000062826795,0.025956074,0.00005033611,0.0002691648,0.754117,0.0007030697],"about_ca_topic_score_codex":0.0000067068336,"about_ca_topic_score_gemma":5.664376e-7,"teacher_disagreement_score":0.753828,"about_ca_system_score_codex":0.00007964345,"about_ca_system_score_gemma":0.000032191892,"threshold_uncertainty_score":0.9998663},"labels":[],"label_agreement":null},{"id":"W4386568018","doi":"10.24018/ejece.2023.7.4.549","title":"Remote Data Acquisition System for Photovoltaic Water Pumping System in Sukkar, Pakistan","year":2023,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"GSM; Data acquisition; Data logger; Microcontroller; Embedded system; Photovoltaic system; Real-time computing; Computer science; Troubleshooting; Database; Computer hardware; Engineering; Operating system; Electrical engineering","score_opus":0.013950398257492435,"score_gpt":0.21123149601171978,"score_spread":0.19728109775422734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386568018","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21837889,0.00011110272,0.7801435,0.000014227488,0.00094132737,0.00007776655,0.0000017207468,0.0002531516,0.0000783022],"genre_scores_gemma":[0.9924096,0.000021958487,0.0071891034,0.000008743404,0.00033500732,6.723814e-7,0.00000326606,0.000027586886,0.0000040695136],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986985,0.00003172869,0.0003996662,0.00021721575,0.00025460456,0.0003983059],"domain_scores_gemma":[0.9994839,0.00005434449,0.000038370967,0.00025278464,0.000054499444,0.00011614312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022319534,0.00012690638,0.0001864281,0.00054762955,0.00006576297,0.00014592847,0.00059404783,0.000013759941,2.362849e-7],"category_scores_gemma":[0.000015516189,0.00010371067,0.000030756317,0.00077526085,0.000019497515,0.00026840137,0.00018401463,0.00014901892,0.000007062643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007844883,0.0000040610867,0.000013688707,0.0002431208,0.000018040108,0.00023443782,0.00009172137,0.96622235,0.021772588,0.00020387181,0.00018955358,0.010998751],"study_design_scores_gemma":[0.00031530726,0.00007971448,0.0010980845,0.0002708176,0.000008198072,0.00012672236,0.000013633826,0.9938579,0.0026986802,0.0000015070598,0.001404011,0.00012540583],"about_ca_topic_score_codex":0.0000017957337,"about_ca_topic_score_gemma":1.2746648e-7,"teacher_disagreement_score":0.7740307,"about_ca_system_score_codex":0.00017277263,"about_ca_system_score_gemma":0.000011879823,"threshold_uncertainty_score":0.42291984},"labels":[],"label_agreement":null},{"id":"W4386616486","doi":"10.1016/j.epsr.2023.109831","title":"A novel non-intrusive framework for real-time disaggregation of behind-the-meter solar generation from smart meter data","year":2023,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Qatar National Research Fund; Qatar Foundation","keywords":"Smart meter; Photovoltaic system; Observability; Computer science; Smart grid; Robustness (evolution); Metre; Reliability engineering; Real-time computing; Convergence (economics); Engineering; Electrical engineering; Mathematics","score_opus":0.0887192148000105,"score_gpt":0.33379177997805115,"score_spread":0.24507256517804066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386616486","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22014587,0.0007095042,0.77159584,0.0004292737,0.0026147563,0.0025967758,0.00036824626,0.0003940168,0.0011457059],"genre_scores_gemma":[0.99279803,0.00019444406,0.0029399756,0.000011716542,0.0009028788,0.0006691214,0.0009275949,0.00011693047,0.0014393053],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99720436,0.00018604842,0.00048859534,0.00049357757,0.0009439829,0.0006834471],"domain_scores_gemma":[0.99718314,0.0009556914,0.00008267985,0.0014488673,0.0002455515,0.00008404968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026057523,0.00019918945,0.0003152765,0.00052722025,0.00018700228,0.00016969282,0.0009145014,0.00017781109,0.000035918907],"category_scores_gemma":[0.000537882,0.00016889363,0.00007370772,0.0013286317,0.000036498237,0.00026911727,0.00029512623,0.00035412176,0.00020454726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009885886,0.00010516605,0.00024689606,0.00025927063,0.0013531905,0.000012990662,0.0016264287,0.057443205,0.623812,0.0022573264,0.30957305,0.003211568],"study_design_scores_gemma":[0.00036754322,0.00011611835,0.0013950252,0.000095948584,0.00004014686,0.000001678826,0.00007713716,0.9687031,0.017923094,0.00022380064,0.010840355,0.00021608899],"about_ca_topic_score_codex":0.0011862109,"about_ca_topic_score_gemma":0.000060351325,"teacher_disagreement_score":0.91125983,"about_ca_system_score_codex":0.0002181982,"about_ca_system_score_gemma":0.000060368136,"threshold_uncertainty_score":0.6887283},"labels":[],"label_agreement":null},{"id":"W4386752288","doi":"10.1007/978-981-99-3236-8_23","title":"Reviewing Non-intrusive Load Monitoring Using a Pilot Study of an IoT Device to Disaggregate Energy Usage","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Standardization; Energy consumption; Computer science; Process (computing); Task (project management); Internet of Things; Energy (signal processing); Data science; Engineering; Systems engineering; Embedded system","score_opus":0.0397455683792588,"score_gpt":0.251151808546068,"score_spread":0.2114062401668092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386752288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37780932,0.088515714,0.4711495,0.0000321135,0.034135837,0.007543074,0.000042872576,0.0014405929,0.019330984],"genre_scores_gemma":[0.99562126,0.0010035909,0.00017438333,0.000019261473,0.0022755784,0.000079238474,0.000008739603,0.00023905934,0.00057888904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997643,0.000071452,0.0008263743,0.0005889338,0.00041519888,0.0004550234],"domain_scores_gemma":[0.99872327,0.00023575165,0.00019786587,0.00062349427,0.00007901826,0.00014057347],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00049944804,0.0006025967,0.0010872246,0.00030647183,0.00008060817,0.00013252514,0.0002879635,0.00023196643,0.0000031767245],"category_scores_gemma":[0.000032929845,0.00058520294,0.00006240711,0.00026904527,0.000020275273,0.00007586476,0.00021317787,0.00042308102,0.0000019412244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001500551,0.000019250841,0.00028454218,0.0005327518,0.0002151171,0.000098211065,0.00041677782,0.98901856,0.000061784165,0.00007811743,0.000012281422,0.009247613],"study_design_scores_gemma":[0.0005987083,0.00066547404,0.00035683656,0.010673773,0.00026551104,0.000015339643,0.000106012936,0.9829919,0.000029079314,0.00010177248,0.003108914,0.0010867075],"about_ca_topic_score_codex":0.0016489553,"about_ca_topic_score_gemma":0.0016583205,"teacher_disagreement_score":0.6178119,"about_ca_system_score_codex":0.00031639094,"about_ca_system_score_gemma":0.000016146616,"threshold_uncertainty_score":0.99965996},"labels":[],"label_agreement":null},{"id":"W4386798810","doi":"10.1016/j.rser.2023.113742","title":"The role of energy communities in electricity grid balancing: A flexible tool for smart grid power distribution optimization","year":2023,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Renewable energy; Grid; Smart grid; Environmental economics; Energy storage; Electricity; Energy management; Computer science; Distributed generation; Intermittent energy source; Demand response; Simulation; Distributed computing; Engineering; Energy (signal processing); Power (physics); Electrical engineering; Economics","score_opus":0.007434359809189869,"score_gpt":0.20632319294312423,"score_spread":0.19888883313393435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386798810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020944638,0.21547563,0.73354524,0.00045389665,0.0019019119,0.0022741556,0.00011786518,0.0013224795,0.02396418],"genre_scores_gemma":[0.5500872,0.4274486,0.00077050383,0.00017631889,0.00044153986,0.0027119874,0.0023926112,0.00016631614,0.015804917],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983108,0.00012951692,0.0005578398,0.00017661514,0.0001426718,0.00068253936],"domain_scores_gemma":[0.9991119,0.00021456866,0.00009986034,0.0004090523,0.00011358655,0.000051068953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011853466,0.00022836034,0.00042191433,0.00018212596,0.00028668455,0.00007658038,0.00022588554,0.00008918049,0.00000957723],"category_scores_gemma":[0.000119460936,0.00018845955,0.00009889204,0.0010778358,0.000042778764,0.00021357577,0.00013098204,0.00007192616,6.365312e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023939308,0.000018927549,0.0003617467,0.00027890425,0.00003398013,0.0000020733899,0.000056091747,0.9477421,0.00006042794,0.02793246,0.018655714,0.004833617],"study_design_scores_gemma":[0.00022631077,0.000047823396,0.000060378166,0.000060814,0.000017879713,0.0000012221809,0.0006450355,0.24154417,0.0015359989,0.001438964,0.754252,0.00016938614],"about_ca_topic_score_codex":0.0027980758,"about_ca_topic_score_gemma":0.0005923519,"teacher_disagreement_score":0.7355963,"about_ca_system_score_codex":0.00020546715,"about_ca_system_score_gemma":0.00004230443,"threshold_uncertainty_score":0.76851577},"labels":[],"label_agreement":null},{"id":"W4386899209","doi":"10.1109/sefet57834.2023.10245783","title":"Open Source Software-Based Industrial Internet of Things for Aiding Visibility to Distributed Generation","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"General Electric (Canada)","funders":"","keywords":"Computer science; Modbus; Cloud computing; Distributed generation; Distributed computing; Digitization; Vendor; SCADA; Edge computing; The Internet; Enhanced Data Rates for GSM Evolution; Visibility; Software; Computer network; Operating system; Telecommunications; Engineering","score_opus":0.0689852197890973,"score_gpt":0.26876431399757345,"score_spread":0.19977909420847614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386899209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.252896,0.0000011138991,0.7453852,0.0001352031,0.00046137895,0.00049818767,0.000017086759,0.00046357297,0.00014219251],"genre_scores_gemma":[0.9871599,3.431477e-7,0.011392893,0.00013923543,0.00017770087,0.00016827363,0.00040810707,0.000035407178,0.00051810464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991998,0.000017468103,0.00026440626,0.00020381583,0.00012391307,0.00019056966],"domain_scores_gemma":[0.9995284,0.00010179933,0.000027161106,0.00024345762,0.000042123003,0.000057061872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005135652,0.00010808787,0.00016034141,0.00010705946,0.000032323358,0.00008366086,0.0003383324,0.00006325885,0.000058733127],"category_scores_gemma":[0.00028008825,0.0001091502,0.00004655566,0.000370826,0.000008018918,0.00017175119,0.00023174848,0.000054616637,0.00001979406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027680046,0.000013079906,0.0010513287,0.00003523415,0.000038379712,3.3268424e-7,0.00009949914,0.8939874,0.0025532462,0.00030001122,0.09603465,0.005859156],"study_design_scores_gemma":[0.0007221691,0.00006355425,0.0004501796,0.000023046252,0.000014073669,5.3962335e-8,0.00003981214,0.9049921,0.071020246,0.000048819995,0.022477161,0.00014878777],"about_ca_topic_score_codex":0.00022374204,"about_ca_topic_score_gemma":0.000040450468,"teacher_disagreement_score":0.7342639,"about_ca_system_score_codex":0.00011432101,"about_ca_system_score_gemma":0.000015187881,"threshold_uncertainty_score":0.4451016},"labels":[],"label_agreement":null},{"id":"W4387005956","doi":"10.1109/pesgm52003.2023.10252545","title":"Effects on Electricity Customers’ Welfare Considering Optimal Generation Dispatch and Emission Reduction in Composite Power Systems","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Centre for Social Innovation","funders":"EMI","keywords":"Reduction (mathematics); Electricity generation; Electricity; Electric power system; Welfare; Composite number; Environmental economics; Economic dispatch; Power (physics); Business; Computer science; Automotive engineering; Natural resource economics; Economics; Electrical engineering; Engineering; Market economy; Mathematics; Thermodynamics; Physics","score_opus":0.008173402896365749,"score_gpt":0.20380367706826916,"score_spread":0.1956302741719034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387005956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99507046,0.000086227454,0.0016686908,0.00013528981,0.0008273809,0.0002382261,5.222232e-7,0.0005097612,0.0014634279],"genre_scores_gemma":[0.9994782,0.00006571337,0.00011821308,0.000009373679,0.0000752887,0.00004400762,0.000017380646,0.000026125865,0.00016568188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992685,0.00003559832,0.00015246999,0.0001965534,0.0001369844,0.00020991555],"domain_scores_gemma":[0.9997925,0.000026630483,0.0000150475535,0.00010384147,0.000010965425,0.00005099544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013639328,0.00013236405,0.00013187727,0.00026626224,0.00006686359,0.000049460963,0.000035622383,0.0000606684,0.000004970677],"category_scores_gemma":[0.00000928508,0.00012993267,0.00001648484,0.00037357098,0.0000065725135,0.00010377228,0.000029776618,0.00010465206,0.000017936878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007072681,0.0000076288397,0.0006345297,0.00008776959,0.000016685168,0.000016052758,0.00008856046,0.8782256,0.11801198,0.00028206935,0.002057024,0.00056498614],"study_design_scores_gemma":[0.0003623848,0.00004287784,0.019133613,0.00006206181,0.000008881636,0.0000078171515,0.000097966964,0.88370156,0.094959304,0.0000017035976,0.0014237708,0.00019804422],"about_ca_topic_score_codex":0.00006361374,"about_ca_topic_score_gemma":0.000005622145,"teacher_disagreement_score":0.023052676,"about_ca_system_score_codex":0.00013572755,"about_ca_system_score_gemma":0.000002230536,"threshold_uncertainty_score":0.52985},"labels":[],"label_agreement":null},{"id":"W4387006347","doi":"10.1109/pesgm52003.2023.10252246","title":"Energy Allocation of the Community Energy Storage System: A Contribution-Based Incentive Mechanism","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prosumer; Incentive; Computer science; Energy storage; Environmental economics; Energy (signal processing); Index (typography); Interval (graph theory); Microeconomics; Renewable energy; Economics; Engineering; Mathematics; Statistics; Electrical engineering; Power (physics)","score_opus":0.008276517028554854,"score_gpt":0.18358476629230006,"score_spread":0.1753082492637452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387006347","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10333163,0.000042445095,0.88341534,0.0001721361,0.0016505894,0.00015497979,0.000026112753,0.0014142912,0.00979249],"genre_scores_gemma":[0.9992909,0.000010397832,0.00004682479,0.00008174817,0.000036597794,0.00007833703,0.00007237457,0.000022816988,0.00036000885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909294,0.00019310546,0.00021919083,0.00008578199,0.00022082137,0.00018815055],"domain_scores_gemma":[0.9992154,0.00012099105,0.000050278966,0.000492508,0.000087129374,0.00003365973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002999631,0.0001224632,0.00014766368,0.000112769376,0.00013663185,0.000013565891,0.00030459467,0.00006012104,0.00001895579],"category_scores_gemma":[0.000020785903,0.000099220946,0.00006950327,0.00058295246,0.000028562124,0.000051486215,0.000111629364,0.000083876206,0.000009344882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003981115,0.000021707505,0.000033236167,0.00006938323,0.000079533005,0.0000012087801,0.00005034708,0.5693126,0.0052715205,0.42257679,0.0023319381,0.00024778908],"study_design_scores_gemma":[0.00033580384,0.000015992966,0.0010262269,0.000057451543,0.000026388787,2.786651e-7,0.00042949858,0.8716327,0.1228753,0.000510631,0.00296702,0.0001227193],"about_ca_topic_score_codex":0.0020087664,"about_ca_topic_score_gemma":0.001002142,"teacher_disagreement_score":0.89595926,"about_ca_system_score_codex":0.00024356077,"about_ca_system_score_gemma":0.00001877588,"threshold_uncertainty_score":0.4046113},"labels":[],"label_agreement":null},{"id":"W4387011247","doi":"10.1109/pesgm52003.2023.10253435","title":"Capacity Market for Distribution System Operator – with Reliability Transactions – Considering Critical Loads and Microgrids","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Provisioning; Demand response; Distributed generation; Reliability (semiconductor); Asset (computer security); Transactive memory; Reliability engineering; Computer science; Social Welfare; Environmental economics; Business; Economics; Computer security; Engineering; Electricity; Computer network; Renewable energy","score_opus":0.010123731663979759,"score_gpt":0.19959775155179074,"score_spread":0.18947401988781098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387011247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2893873,0.0000218997,0.70657295,0.00046507185,0.00047286772,0.00034623087,0.00016823802,0.0013982047,0.0011672514],"genre_scores_gemma":[0.9959753,0.000010799291,0.003602969,0.000012275205,0.000044819262,0.00018346896,0.00002233363,0.000022565364,0.00012546976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929863,0.000017916154,0.00015206094,0.00019662172,0.00009071589,0.00024406768],"domain_scores_gemma":[0.99952996,0.00016289191,0.0000050314857,0.00016996346,0.000048855618,0.000083306804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002581982,0.00012251305,0.00013895688,0.000036083853,0.00011501909,0.000059711932,0.000045127068,0.000050544495,0.000031732285],"category_scores_gemma":[0.000032014035,0.00010902256,0.000030252542,0.0001358353,0.00006921659,0.000115706134,0.0000098141945,0.0000677396,0.0000061798355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002960169,0.00019882838,0.009498115,0.013185806,0.0008330349,0.000074873715,0.0006403292,0.7986128,0.008882703,0.0361792,0.12642963,0.0051687234],"study_design_scores_gemma":[0.0008160672,0.00009090349,0.011919669,0.00011566531,0.00011746848,0.00003897471,0.000690865,0.9441207,0.012170163,0.00005305639,0.029414747,0.00045171153],"about_ca_topic_score_codex":0.000032223386,"about_ca_topic_score_gemma":0.00006527955,"teacher_disagreement_score":0.70658803,"about_ca_system_score_codex":0.00012494529,"about_ca_system_score_gemma":0.000007632514,"threshold_uncertainty_score":0.4445811},"labels":[],"label_agreement":null},{"id":"W4387011272","doi":"10.1109/pesgm52003.2023.10253301","title":"Deregulated Distribution System Planning - Incremental Capacity Auction Mechanism with Transactive DERs","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Toronto Metropolitan University","funders":"","keywords":"Distributed generation; Demand response; Renewable energy; Load management; Electric power system; Environmental economics; Transactive memory; Computer science; Electricity; Business; Reliability engineering; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.011629373278177093,"score_gpt":0.17393018537257815,"score_spread":0.16230081209440106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387011272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5167087,0.000002740485,0.4797074,0.00001694232,0.00027808006,0.00013017438,0.000010930221,0.0018504482,0.0012946409],"genre_scores_gemma":[0.99938226,0.0000018732369,0.00027046338,0.000005304044,0.000034462115,0.00004482794,0.00017035748,0.000027772201,0.000062668725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992595,0.000017873164,0.00012266447,0.00015602882,0.00020657918,0.00023740907],"domain_scores_gemma":[0.9997921,0.000011045336,0.000016084306,0.00011429246,0.000017512351,0.00004895041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011469409,0.00013810913,0.00010695826,0.00008417731,0.00009205982,0.000028131375,0.000063767475,0.00005299829,0.000020182431],"category_scores_gemma":[0.0000012574995,0.00012725944,0.00002602817,0.0003731498,0.000014256379,0.00016112546,0.000010316068,0.000078774014,0.000043157866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017427481,0.0000060209472,0.00008863371,0.00010215087,0.00019057855,0.000017408538,0.00023424799,0.99011666,0.0043724217,0.003908079,0.0008193712,0.00012702543],"study_design_scores_gemma":[0.0005906695,0.000050709074,0.005259258,0.000101705016,0.000061001072,0.000017566623,0.003322074,0.8917849,0.098236375,0.00004895452,0.00023785258,0.00028891678],"about_ca_topic_score_codex":0.00012332761,"about_ca_topic_score_gemma":0.000035435638,"teacher_disagreement_score":0.48267362,"about_ca_system_score_codex":0.00039446008,"about_ca_system_score_gemma":0.00000386619,"threshold_uncertainty_score":0.5189489},"labels":[],"label_agreement":null},{"id":"W4387027427","doi":"10.1109/pesgm52003.2023.10252866","title":"Learning a Multi-Agent Controller for Shared Energy Storage System","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Computer science; Reinforcement learning; Software deployment; Installation; Energy storage; Electricity; Schedule; Demand response; Scheduling (production processes); Smart grid; Real-time computing; Power (physics); Simulation; Operating system; Electrical engineering; Engineering; Operations management","score_opus":0.017711196581643048,"score_gpt":0.20916508949491994,"score_spread":0.19145389291327689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387027427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010035872,0.0001316698,0.96733516,0.00007284335,0.001865239,0.00040187198,0.000012141014,0.006755777,0.013389418],"genre_scores_gemma":[0.97454983,0.000018326993,0.0013333468,0.000038801776,0.00019783838,0.0005038628,0.0000479206,0.00007610455,0.02323396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914753,0.000018390205,0.00019054773,0.00018461517,0.00012569941,0.000333233],"domain_scores_gemma":[0.99966925,0.00006927339,0.000018536955,0.00014832572,0.000026890837,0.00006770109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016906527,0.00014853051,0.00018795967,0.00015572042,0.000074823714,0.00004615294,0.00012321894,0.000050838276,0.000056384753],"category_scores_gemma":[0.00002240681,0.0001425596,0.00009072234,0.00021566094,0.000005484791,0.00006251693,0.00005235081,0.00005349936,0.0001894694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006308943,0.0000053569725,0.000039000533,0.000111731584,0.00011946242,0.0000099959525,0.00007637966,0.9653651,0.0007769795,0.003404393,0.02863034,0.001454909],"study_design_scores_gemma":[0.00091118045,0.000018999386,0.00039535892,0.000018574274,0.000014193721,6.012743e-7,0.00033793814,0.83027595,0.00025844065,0.000002387084,0.16762297,0.0001434129],"about_ca_topic_score_codex":0.0000383517,"about_ca_topic_score_gemma":0.000028391201,"teacher_disagreement_score":0.9660018,"about_ca_system_score_codex":0.00014151428,"about_ca_system_score_gemma":0.0000037298526,"threshold_uncertainty_score":0.58134115},"labels":[],"label_agreement":null},{"id":"W4387039521","doi":"10.1049/icp.2023.0518","title":"The EUniversal Portuguese demonstrator: from MV-LV coordinated identification of flexibility needs to activation through the UMEI","year":2023,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Flexibility (engineering); European union; Process (computing); Portuguese; Computer science; Identification (biology); Key (lock); Grid; Interface (matter); Core (optical fiber); Process management; Systems engineering; Risk analysis (engineering); Business; Engineering; Telecommunications; Computer security; Operating system","score_opus":0.025206995964060525,"score_gpt":0.24238127119418612,"score_spread":0.21717427523012559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387039521","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9784299,0.000028529877,0.011924734,0.0016865873,0.0006290281,0.0004675456,0.000020642741,0.0006280148,0.0061849956],"genre_scores_gemma":[0.9992324,0.000088248285,0.00009650783,0.000035454028,0.000087613924,0.0000703552,0.000028905506,0.000022278711,0.00033822545],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885106,0.000013207883,0.00035682268,0.00022731777,0.00028682992,0.00026476776],"domain_scores_gemma":[0.99920326,0.00008304807,0.000111035486,0.00026851578,0.00028520921,0.000048911174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039451924,0.00016619856,0.00014959944,0.000087689725,0.00016302738,0.00012167091,0.000499588,0.0000796255,0.000025638217],"category_scores_gemma":[0.00017191985,0.000121781784,0.000046689478,0.001095502,0.00010554675,0.00038308173,0.0001170469,0.0001637635,0.000060467148],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002466266,0.00013710481,0.015539983,0.00030439754,0.00086429465,0.0000041116855,0.03190933,0.045686092,0.56254876,0.17106135,0.11769607,0.05400189],"study_design_scores_gemma":[0.0007590904,0.00012521243,0.2482623,0.00018844957,0.00015475175,0.0000014641765,0.03845387,0.3739946,0.2907927,0.014413584,0.03201877,0.00083519943],"about_ca_topic_score_codex":0.00017645479,"about_ca_topic_score_gemma":0.000028407865,"teacher_disagreement_score":0.3283085,"about_ca_system_score_codex":0.00009425914,"about_ca_system_score_gemma":0.00003230786,"threshold_uncertainty_score":0.4966117},"labels":[],"label_agreement":null},{"id":"W4387039737","doi":"10.1049/icp.2023.0264","title":"A new customer-oriented approach for residential demand-side flexibility: the case of the Zeeland region in the Netherlands","year":2023,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fractal Systems (Canada)","funders":"","keywords":"Flexibility (engineering); Renewable energy; Electricity; Monetization; Volatility (finance); Carbon footprint; Environmental economics; Smart grid; Demand side; Load shifting; Electricity price; Business; Demand response; Consumption (sociology); Natural resource economics; Economics; Engineering; Electrical engineering; Finance","score_opus":0.03336856792827768,"score_gpt":0.25032036958349874,"score_spread":0.21695180165522104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387039737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9410385,0.000117997486,0.036759082,0.0018193715,0.0007310512,0.0019291034,0.000009136116,0.0003506701,0.017245075],"genre_scores_gemma":[0.99866754,0.000039550643,0.00028282873,0.000053430696,0.00021319484,0.0002210254,0.0000059771664,0.00002455976,0.00049189565],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989082,0.000025324869,0.00029185737,0.00024561005,0.00021334628,0.00031564006],"domain_scores_gemma":[0.9994247,0.00008298017,0.0000737027,0.0002926668,0.00008954396,0.000036432175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007604144,0.00017336545,0.0001789898,0.000094044444,0.00012965071,0.00008889579,0.00051833305,0.0000810475,0.0000052757982],"category_scores_gemma":[0.00012395602,0.00009303538,0.00008735337,0.00084631774,0.00007693563,0.00011705359,0.00011522884,0.00022095928,0.0000033715164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005861401,0.00021844974,0.042245843,0.0024943347,0.0006425224,0.00016802423,0.08184562,0.16746669,0.0027598632,0.18981136,0.48859525,0.023165928],"study_design_scores_gemma":[0.002568119,0.00014831896,0.026393201,0.00023599554,0.00024325894,0.00032340005,0.020823488,0.90851736,0.00371993,0.0077202534,0.028666928,0.00063976157],"about_ca_topic_score_codex":0.00028084946,"about_ca_topic_score_gemma":0.0002487648,"teacher_disagreement_score":0.74105066,"about_ca_system_score_codex":0.0000376327,"about_ca_system_score_gemma":0.000037451693,"threshold_uncertainty_score":0.37938726},"labels":[],"label_agreement":null},{"id":"W4387349009","doi":"10.2139/ssrn.4592042","title":"Can You Lower the Thermostat? Perceptions of Demand Response Programs in Quebec","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Thermostat; Demand response; Perception; Economics; Business; Psychology; Electrical engineering; Engineering","score_opus":0.013632048800866447,"score_gpt":0.22745133491307712,"score_spread":0.21381928611221068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387349009","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98894596,0.0013366665,0.0053902054,0.0021610698,0.001282953,0.00043852374,0.000008013754,0.00019092922,0.00024568196],"genre_scores_gemma":[0.99073887,0.0047857743,0.000042711963,0.000016005339,0.0002657569,0.000095282,0.000016667092,0.00010815981,0.0039308015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99697727,0.00024988793,0.00051004475,0.00023950673,0.00034665724,0.001676627],"domain_scores_gemma":[0.9991535,0.00008274968,0.000123956,0.00052785565,0.000054496482,0.00005747052],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0029053935,0.00029909253,0.00031116794,0.00031070036,0.000083862404,0.000090656846,0.00066776614,0.0001786063,0.00002425371],"category_scores_gemma":[0.00005217091,0.00023483847,0.00021060366,0.00031789552,0.00007796564,0.000053228825,0.00024823906,0.0034892554,0.000018136343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023756777,0.00009652621,0.0033456197,0.00008413105,0.0008631796,0.000036952057,0.0028354526,0.9696371,0.00036302372,0.0049657,0.0005319145,0.017002828],"study_design_scores_gemma":[0.005675191,0.0017564519,0.4097834,0.002955243,0.0012274969,0.0005611704,0.07282907,0.09432391,0.00025646805,0.37876132,0.027159218,0.004711063],"about_ca_topic_score_codex":0.005440697,"about_ca_topic_score_gemma":0.24729137,"teacher_disagreement_score":0.87531316,"about_ca_system_score_codex":0.0023477897,"about_ca_system_score_gemma":0.0012048214,"threshold_uncertainty_score":0.99880975},"labels":[],"label_agreement":null},{"id":"W4387374361","doi":"10.1016/j.jobe.2023.107877","title":"IoT-assisted energy cooperation in adjacent buildings with interrupted utility","year":2023,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"News aggregator; Renewable energy; Efficient energy use; Computer science; Electricity; Work (physics); Energy management; Electricity generation; Energy consumption; Reliability engineering; Energy (signal processing); Power (physics); Environmental economics; Engineering; Telecommunications; Architectural engineering; Electrical engineering; Economics; Mechanical engineering","score_opus":0.009639529783990249,"score_gpt":0.19941644884558302,"score_spread":0.18977691906159277,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387374361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8103787,0.00017695189,0.18796763,0.00007218714,0.00088635244,0.00005023163,9.764832e-7,0.0003251289,0.00014185341],"genre_scores_gemma":[0.9925707,0.00009157331,0.0070402916,0.00001563733,0.00018551033,0.000008117739,0.0000026205637,0.00005981551,0.000025723106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873036,0.000015678097,0.0005059821,0.00013540716,0.00028134443,0.00033121818],"domain_scores_gemma":[0.9995285,0.00006110592,0.00007824543,0.00016409432,0.00007179934,0.00009621187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042085644,0.00020339053,0.00029679138,0.00080568466,0.000023726514,0.000054509757,0.00020723946,0.00006713563,0.00001401806],"category_scores_gemma":[0.000060090217,0.0001888897,0.000066472836,0.00096602185,0.0000107115275,0.0002038731,0.000047997608,0.00027218097,0.000002019465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019025943,0.000014695419,0.00052110536,0.00005941247,0.00008164068,0.000110123896,0.00007490955,0.9641698,0.029423837,0.00032925885,0.0009370088,0.004259195],"study_design_scores_gemma":[0.00081319816,0.000091534384,0.0166672,0.0004933287,0.000025777483,0.000080693426,0.000048103797,0.94715524,0.01760613,0.000009737727,0.016725555,0.00028349625],"about_ca_topic_score_codex":0.000016969558,"about_ca_topic_score_gemma":0.000021083806,"teacher_disagreement_score":0.18219201,"about_ca_system_score_codex":0.00028216196,"about_ca_system_score_gemma":0.00001746259,"threshold_uncertainty_score":0.7702698},"labels":[],"label_agreement":null},{"id":"W4387385672","doi":"10.1109/access.2023.3322193","title":"Data-Efficient MADDPG Based on Self-Attention for IoT Energy Management Systems","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Computer science; Scalability; Exploit; Dependency (UML); Distributed computing; Artificial intelligence; Machine learning; Computer security; Database","score_opus":0.04216583175407556,"score_gpt":0.27609299265596815,"score_spread":0.23392716090189258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387385672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065339915,0.00013063384,0.8792917,0.00032927614,0.022854172,0.0018154726,0.00038585637,0.0065056877,0.023347266],"genre_scores_gemma":[0.9961568,0.000050714785,0.0005699256,0.00015471128,0.00057270436,0.0007807681,0.0005669276,0.00010768656,0.0010397459],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984832,0.000025237106,0.0002785291,0.000433126,0.0003674173,0.0004125097],"domain_scores_gemma":[0.99876964,0.00007363725,0.000043868662,0.0010138995,0.000030057618,0.000068870424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034077026,0.00021413926,0.00017765863,0.00039691952,0.00009020743,0.00018654128,0.00091989373,0.000057295907,0.000011074661],"category_scores_gemma":[0.0000049385226,0.00021900979,0.000057666603,0.0005687451,0.000008369807,0.00010542548,0.0001744148,0.000053562384,0.000094684714],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008262829,0.00004605145,0.000042023403,0.00036740478,0.00011439209,0.000017574293,0.000004266238,0.89645237,0.000050670715,0.002031598,0.09949725,0.0013681113],"study_design_scores_gemma":[0.00046244744,0.00001843899,0.0012230829,0.000063203486,0.000056967663,2.9709565e-7,0.000015640131,0.8544108,0.00027639917,0.000017933684,0.14324303,0.00021171896],"about_ca_topic_score_codex":0.000042529366,"about_ca_topic_score_gemma":0.000019040499,"teacher_disagreement_score":0.9308169,"about_ca_system_score_codex":0.00015563222,"about_ca_system_score_gemma":0.000007377275,"threshold_uncertainty_score":0.893096},"labels":[],"label_agreement":null},{"id":"W4387425195","doi":"10.1016/j.energy.2023.129297","title":"New coordination framework for smart home peer-to-peer trading to reduce impact on distribution transformer","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Smart grid; Distributed generation; Distribution transformer; Transformer; Electric power system; Power transmission; Grid; AC power; Reliability engineering; Computer science; Environmental economics; Electrical engineering; Engineering; Renewable energy; Power (physics); Economics","score_opus":0.015583205023295691,"score_gpt":0.26996279958022784,"score_spread":0.25437959455693215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387425195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07343732,0.0000124068,0.91651523,0.0052641905,0.0020020828,0.00021425939,0.00008000103,0.00070966914,0.0017648193],"genre_scores_gemma":[0.98826575,0.000006849582,0.002436468,0.00017153437,0.00077511487,0.0001865987,0.0005720981,0.00008084412,0.0075047133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986606,0.000012517229,0.00020591251,0.00026790454,0.00038235766,0.00047071095],"domain_scores_gemma":[0.99932194,0.00010810386,0.000015660833,0.00024680165,0.00006241731,0.00024506694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023790955,0.00022488637,0.00018977206,0.0002473866,0.000081231876,0.0000678727,0.00017203097,0.00010932421,0.000085792446],"category_scores_gemma":[0.0001123819,0.00022557583,0.0001273618,0.0009082118,0.0000045073252,0.00011300998,0.000012976912,0.00009657022,0.00011831088],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039779316,0.000008662889,0.000016104737,0.00001165411,0.000056769753,0.0000018388695,0.000164957,0.61055607,0.0012737215,0.026029719,0.3401323,0.021708434],"study_design_scores_gemma":[0.00061225065,0.00034996858,0.011024969,0.000110416375,0.000042065007,0.0000016503935,0.00007977059,0.10366051,0.033456698,0.0050414857,0.84498084,0.0006393955],"about_ca_topic_score_codex":0.00012248977,"about_ca_topic_score_gemma":0.00002717355,"teacher_disagreement_score":0.9148285,"about_ca_system_score_codex":0.00039807204,"about_ca_system_score_gemma":0.00001755889,"threshold_uncertainty_score":0.91987157},"labels":[],"label_agreement":null},{"id":"W4387475923","doi":"10.1109/sege59172.2023.10274535","title":"Strategic Prosumer-Side Energy Trading Using A Parameter Independent Convex Model: From A Discussion Toward A Case Study","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"","keywords":"Prosumer; Profit (economics); Computer science; Regular polygon; Renewable energy; Scalability; Energy management; Profit model; Operations research; Mathematical optimization; Industrial organization; Environmental economics; Business; Energy (signal processing); Microeconomics; Economics; Engineering; Mathematics","score_opus":0.0789425799477115,"score_gpt":0.2689935874096079,"score_spread":0.19005100746189638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387475923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93526495,0.000022070877,0.061702136,0.000039733593,0.00045256727,0.00030492782,0.000007733874,0.0011596195,0.0010462602],"genre_scores_gemma":[0.9977759,0.000008321431,0.0015137405,0.000035672256,0.00010473983,0.00013851188,0.000017884042,0.000096289776,0.00030891201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982578,0.000054627788,0.00039020827,0.0004566311,0.00036914958,0.00047157516],"domain_scores_gemma":[0.99933255,0.00005123417,0.000035396068,0.00041658356,0.000017231709,0.00014703488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017593305,0.0003199992,0.0003132886,0.0002700689,0.00009344895,0.00014638124,0.0001787646,0.00008945723,0.00007319727],"category_scores_gemma":[0.000006440736,0.00023358353,0.00009161297,0.00045652853,0.000017180835,0.00022879972,0.0001589942,0.00016311355,0.000019875031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009471516,0.00008247224,0.0005972457,0.000024301453,0.00023073959,0.0031157471,0.0018382119,0.9907127,0.0016805601,0.00026163712,0.00019939222,0.0012475278],"study_design_scores_gemma":[0.00063569634,0.00004595944,0.00013762817,0.000024584311,0.000087813314,0.00006202463,0.009066436,0.9875054,0.0006765745,0.0013535134,0.00003921823,0.0003651762],"about_ca_topic_score_codex":0.0028158894,"about_ca_topic_score_gemma":0.0009727593,"teacher_disagreement_score":0.062510975,"about_ca_system_score_codex":0.0001890473,"about_ca_system_score_gemma":0.000026494776,"threshold_uncertainty_score":0.952526},"labels":[],"label_agreement":null},{"id":"W4387487284","doi":"10.1109/sege59172.2023.10274534","title":"OpenATE: A Distributed Co-simulation Engine for Transactive Energy Systems","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"Science and Engineering Research Council; Université du Québec à Trois-Rivières","keywords":"News aggregator; Computer science; Distributed computing; Orchestration; Scalability; Modular design; Grid; Overhead (engineering); Process (computing); Software engineering; Operating system","score_opus":0.017153071616318027,"score_gpt":0.24249413697884714,"score_spread":0.22534106536252912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387487284","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002616289,0.00003366828,0.99162054,0.00004149458,0.00068801676,0.00023882533,0.000094690084,0.001375942,0.0032905377],"genre_scores_gemma":[0.99746364,0.000021659023,0.0001415564,0.0000124216285,0.000116081384,0.00027617597,0.00055864785,0.000041607644,0.0013682235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993456,0.000009497926,0.00016185074,0.00013778152,0.00011166268,0.0002336154],"domain_scores_gemma":[0.99965554,0.000107811305,0.000011483871,0.00014724427,0.000030686206,0.00004722616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009933781,0.00012159556,0.00013534584,0.00011530206,0.00003858213,0.00003789045,0.00009255608,0.000050206836,0.000032129486],"category_scores_gemma":[0.000008389107,0.00011914962,0.000046576493,0.0003169854,0.000005948471,0.00010832831,0.000007691952,0.000030297524,0.00003867165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008036452,0.0000052224323,0.0000049405794,0.0000514941,0.00008448835,0.0000023212247,0.00002672319,0.98709786,0.0001473013,0.002011343,0.009480639,0.0010796444],"study_design_scores_gemma":[0.00038197974,0.00001590508,0.00018965536,0.000008937469,0.000013965092,2.868861e-7,0.000060718387,0.88703275,0.0017173692,0.000034865545,0.11041032,0.00013323262],"about_ca_topic_score_codex":0.000043257314,"about_ca_topic_score_gemma":0.000011871748,"teacher_disagreement_score":0.99484736,"about_ca_system_score_codex":0.000087319735,"about_ca_system_score_gemma":0.0000038944577,"threshold_uncertainty_score":0.48587805},"labels":[],"label_agreement":null},{"id":"W4387666070","doi":"10.21203/rs.3.rs-3422677/v1","title":"The Value of Long-Duration Energy Storage under Various Grid Conditions in a Zero-Emissions Future","year":2023,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"University of Toronto; California Energy Commission","keywords":"Energy storage; Environmental economics; Grid; Pumped-storage hydroelectricity; Capital cost; Environmental science; Hydropower; Electricity; Distributed generation; Natural resource economics; Renewable energy; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.03618705528711031,"score_gpt":0.3321706312145829,"score_spread":0.2959835759274726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387666070","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4841053,0.022161797,0.35228804,0.0331207,0.046271324,0.010807955,0.0032714074,0.0063753435,0.041598134],"genre_scores_gemma":[0.99111176,0.0038697366,0.00009384124,0.000013593755,0.00089717604,0.0008093171,0.0007745372,0.00012535838,0.0023046802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99699426,0.00041942956,0.000508026,0.00041215375,0.0010361889,0.00062992726],"domain_scores_gemma":[0.99790394,0.0006071918,0.00006582232,0.0010559581,0.00022889617,0.00013818145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001205387,0.0002638066,0.00028878977,0.0007072047,0.0002731132,0.00012898035,0.00067239074,0.00035169764,0.000059204216],"category_scores_gemma":[0.00017365378,0.00022505627,0.00014007058,0.00094132236,0.00012401216,0.00007445108,0.00089771434,0.0013518251,0.000037671864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000087866565,0.00004347736,0.00021984865,0.00042894768,0.00012708527,0.000063269355,0.0002196566,0.9284592,0.00014972866,0.025774222,0.04412451,0.0003812682],"study_design_scores_gemma":[0.0011763565,0.00018057102,0.20991457,0.0028849423,0.00008250876,0.0000102770455,0.003434105,0.64512557,0.0016072944,0.05557985,0.0787309,0.0012730437],"about_ca_topic_score_codex":0.000935972,"about_ca_topic_score_gemma":0.002231875,"teacher_disagreement_score":0.50700647,"about_ca_system_score_codex":0.00066800637,"about_ca_system_score_gemma":0.000216719,"threshold_uncertainty_score":0.9177528},"labels":[],"label_agreement":null},{"id":"W4387789936","doi":"10.1109/tce.2023.3325941","title":"Energy Consumption Prediction Model for Smart Homes via Decentralized Federated Learning With LSTM","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Consumer Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Computer science; Energy consumption; Edge device; Enhanced Data Rates for GSM Evolution; Process (computing); Smart grid; Edge computing; Data modeling; The Internet; Demand response; Distributed computing; Efficient energy use; Big data; Adaptation (eye); Pace; Machine learning; Artificial intelligence; Data mining; Electricity; Cloud computing; Database; Engineering","score_opus":0.012450588695021851,"score_gpt":0.21366165545232035,"score_spread":0.2012110667572985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387789936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037216656,0.000317018,0.95933485,0.00006168907,0.00053631,0.0003171246,0.0000317769,0.0020874671,0.00009711566],"genre_scores_gemma":[0.9930393,0.0042283535,0.00068048516,0.000048305,0.000023990931,0.00058328436,0.00013133093,0.00012933138,0.0011356121],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839187,0.000041423235,0.00028958623,0.00034824954,0.00024492902,0.0006839168],"domain_scores_gemma":[0.9994556,0.00010955974,0.000042555424,0.00020773614,0.0000795769,0.00010502252],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014094534,0.00030559726,0.00024460454,0.00032865137,0.00036210887,0.00007289273,0.000101160185,0.00014024314,0.00004450362],"category_scores_gemma":[0.0000022910426,0.0003225736,0.000102180704,0.0004740456,0.000043642103,0.00018230165,0.0000010789369,0.00031354683,0.000046229918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016067942,0.000041899424,0.000049156093,0.000054799915,0.00041877176,0.0000019969739,0.00005233774,0.97451943,0.0031724717,0.000115744675,0.0009406932,0.020472009],"study_design_scores_gemma":[0.0014276388,0.00015366192,0.000044500946,0.000029316492,0.00017999615,0.000008029077,0.000015159852,0.96589947,0.021565622,0.000069822716,0.010292821,0.0003139567],"about_ca_topic_score_codex":0.000017628492,"about_ca_topic_score_gemma":0.0004940607,"teacher_disagreement_score":0.95865434,"about_ca_system_score_codex":0.0003290006,"about_ca_system_score_gemma":0.0000688297,"threshold_uncertainty_score":0.99992263},"labels":[],"label_agreement":null},{"id":"W4387934868","doi":"10.1109/tia.2023.3327320","title":"Risk Analysis of Transactive Energy Retail Markets","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Negotiation; Risk management; Risk analysis (engineering); Grid; Business; Electricity; Environmental economics; Smart grid; Computer science; Industrial organization; Finance; Knowledge management; Economics; Engineering","score_opus":0.012856382584922992,"score_gpt":0.22024274311883948,"score_spread":0.2073863605339165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387934868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026784372,0.000014716069,0.9666935,0.00008284587,0.00019054297,0.00018345976,0.0004879747,0.00074909435,0.004813455],"genre_scores_gemma":[0.9967843,0.00025163428,0.00026588736,0.000021594822,0.000038881222,0.0010996799,0.000045288907,0.0000440685,0.0014486543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881345,0.000045303463,0.00035090416,0.00028892895,0.00024127615,0.00026012323],"domain_scores_gemma":[0.9989767,0.00016843223,0.00006161459,0.0006343822,0.00005291412,0.00010592082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014700691,0.00019724669,0.00026911945,0.0010213358,0.00015625638,0.000015000725,0.00024406285,0.0002850108,0.00056302344],"category_scores_gemma":[0.0000015237437,0.00022809714,0.00024347639,0.0050226287,0.00006510996,0.00009460293,0.0000010169387,0.00047910932,0.000055548495],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008646511,0.0000581214,0.00005183244,0.000011057191,0.0017914372,9.1152936e-7,0.00008296175,0.9611954,0.0003758269,0.00022150869,0.0006738912,0.035528384],"study_design_scores_gemma":[0.000594456,0.0000482279,0.015901601,0.00002462212,0.004466293,0.0000016851731,0.0005897989,0.8412625,0.06841705,0.00027488504,0.067708485,0.00071038556],"about_ca_topic_score_codex":0.00007515807,"about_ca_topic_score_gemma":0.00012519487,"teacher_disagreement_score":0.9699999,"about_ca_system_score_codex":0.00009782201,"about_ca_system_score_gemma":0.00001689762,"threshold_uncertainty_score":0.93015313},"labels":[],"label_agreement":null},{"id":"W4387993499","doi":"10.1016/j.ijepes.2023.109577","title":"Stackelberg–Nash game approach for price-based demand response in retail electricity trading","year":2023,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China; Natural Science Foundation of Anhui Province; State Key Laboratory Of Alternate Electrical Power System With Renewable Energy Sources; University of Science and Technology of China; National Natural Science Foundation of China","keywords":"Stackelberg competition; Nash equilibrium; Computer science; Best response; Demand response; Scalability; Electricity; Game theory; Mathematical optimization; Microeconomics; Economics; Mathematics; Engineering","score_opus":0.015513021650932796,"score_gpt":0.2337088559305594,"score_spread":0.2181958342796266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387993499","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28394172,0.0012219911,0.7088601,0.00031810184,0.0030597122,0.00025156725,0.000011008256,0.00022786832,0.0021079541],"genre_scores_gemma":[0.99836326,0.00008883589,0.00043199403,0.000076530574,0.00050631596,0.00006274057,0.000018670786,0.00006421141,0.0003874551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99719185,0.00020560075,0.0009757987,0.00024222845,0.0008642257,0.00052027754],"domain_scores_gemma":[0.9984388,0.00068327563,0.00024813513,0.00017185656,0.00030930786,0.0001486408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001666147,0.00024880422,0.00043554473,0.0015697222,0.00003153321,0.00012376696,0.000655305,0.00014330323,0.000012173217],"category_scores_gemma":[0.00038327195,0.00023813511,0.00023004065,0.001153695,0.000020005169,0.00022187854,0.000028847075,0.000299249,0.00000382974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011498886,0.0001140123,0.00044218596,0.000023084902,0.0003453762,0.00014583742,0.00007085643,0.9801091,0.0047005513,0.0028587685,0.009646093,0.00039426095],"study_design_scores_gemma":[0.0017350684,0.00034170347,0.001853634,0.00007312314,0.000022039723,0.00006561153,0.00002801494,0.95388484,0.0021270125,0.00013379284,0.039464466,0.00027072337],"about_ca_topic_score_codex":0.000027241058,"about_ca_topic_score_gemma":0.0000037873438,"teacher_disagreement_score":0.7144215,"about_ca_system_score_codex":0.0009832486,"about_ca_system_score_gemma":0.00011313749,"threshold_uncertainty_score":0.9710868},"labels":[],"label_agreement":null},{"id":"W4388048661","doi":"10.3390/su152115479","title":"Application of Internet of Things in Residential Distribution Systems","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Al-Imam Muhammad Ibn Saud Islamic University","keywords":"Internet of Things; Computer science; Profitability index; Profit (economics); Energy conservation; Distribution management system; Peak demand; Reliability engineering; Electricity; Engineering; Computer security; Electrical engineering; Business","score_opus":0.003987077889118149,"score_gpt":0.21715052888114636,"score_spread":0.21316345099202821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388048661","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9428667,0.000030766794,0.05619148,0.000053537155,0.00018618762,0.00032038818,0.0000061500587,0.00013976447,0.0002050683],"genre_scores_gemma":[0.99977654,0.000004110211,0.000009519654,5.496897e-7,0.000015462214,0.00006249715,0.00006738352,0.00000687371,0.000057074667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993447,0.000031124302,0.00027707033,0.00010540796,0.00011841417,0.00012324759],"domain_scores_gemma":[0.9995648,0.000033396285,0.000037171772,0.00023286665,0.000117633215,0.000014087494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048766204,0.000054752232,0.000120182754,0.000085894295,0.000005221517,0.0000047340654,0.000103453254,0.00003901525,0.0000026025057],"category_scores_gemma":[0.0001515567,0.000060343173,0.000026858781,0.0004471882,0.000032612275,0.00008542719,0.00006023275,0.000049634098,0.0000023773348],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027499176,0.000045037912,0.07960678,0.0036340985,0.000026619078,0.0000033826275,0.0008515824,0.87562037,0.0004372601,0.035250667,0.0022645737,0.0022321448],"study_design_scores_gemma":[0.00020923029,0.000020275598,0.36402744,0.000028076041,0.000007587426,1.9982339e-7,0.0008541903,0.6258162,0.0029730117,0.0039362586,0.002036189,0.000091280395],"about_ca_topic_score_codex":0.0021079383,"about_ca_topic_score_gemma":0.000032257765,"teacher_disagreement_score":0.28442067,"about_ca_system_score_codex":0.00044524702,"about_ca_system_score_gemma":0.000016239048,"threshold_uncertainty_score":0.31865862},"labels":[],"label_agreement":null},{"id":"W4388180756","doi":"10.20517/jsegc.2023.20","title":"Optimal operation and energy management of microgrids","year":2023,"lang":"en","type":"article","venue":"Journal of Smart Environments and Green Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Energy (signal processing); Energy management; Computer science; Business; Mathematics","score_opus":0.0065480033258380815,"score_gpt":0.1863472037800729,"score_spread":0.17979920045423484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388180756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9805056,0.00051063055,0.018315325,0.00006923361,0.00026588046,0.000027142667,0.0000010492508,0.000017333641,0.00028783295],"genre_scores_gemma":[0.9935014,0.0017993536,0.0043428633,0.00002251343,0.00011620063,6.0400686e-7,0.0000021947985,0.000017348048,0.00019748455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992879,0.000013523228,0.0003147511,0.00008612826,0.00016195925,0.00013575291],"domain_scores_gemma":[0.9997721,0.000016969347,0.00008138792,0.00007261081,0.0000037799339,0.0000531668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022403082,0.00009951646,0.00015670124,0.00011694787,0.000048019057,0.00001984454,0.000071613234,0.000026912938,0.000007237924],"category_scores_gemma":[5.9670526e-7,0.000093958835,0.000030924548,0.000065845314,0.0000305318,0.000092984934,0.00014044269,0.00006037617,0.0000018294548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016172082,0.000035200716,0.010704252,0.00015890882,0.00046442467,0.00008731102,0.00027427383,0.80374485,0.0036158818,0.00030823078,0.0008940737,0.1796964],"study_design_scores_gemma":[0.0018026276,0.00031999432,0.32608917,0.00028615133,0.00017924809,0.00009088468,0.0005243756,0.60007256,0.003352905,0.000075665186,0.06681569,0.0003907231],"about_ca_topic_score_codex":0.000007656951,"about_ca_topic_score_gemma":8.9898083e-7,"teacher_disagreement_score":0.31538492,"about_ca_system_score_codex":0.00002381933,"about_ca_system_score_gemma":0.0000011793364,"threshold_uncertainty_score":0.383153},"labels":[],"label_agreement":null},{"id":"W4388207251","doi":"10.1109/ccece58730.2023.10289097","title":"Multi-Timescale Stochastic Electrical and Thermal Energy Management for Sustainable Communities with Wastewater Treatment Plants","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Thermal; Wastewater; Thermal management of electronic devices and systems; Thermal energy; Environmental science; Energy management; Sewage treatment; Energy (signal processing); Computer science; Environmental engineering; Engineering; Mechanical engineering; Meteorology; Physics; Thermodynamics","score_opus":0.011458310621154998,"score_gpt":0.19889554462186348,"score_spread":0.1874372340007085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388207251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8942422,0.00023769084,0.09267774,0.00013045294,0.0001584838,0.0010890438,0.00001188937,0.001861151,0.009591318],"genre_scores_gemma":[0.96986663,0.000088869776,0.0018315619,0.000029093278,0.000038472015,0.0006713822,0.00006751707,0.000058669626,0.027347827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991341,0.000014334325,0.000117851814,0.00013562197,0.00010073533,0.00049732305],"domain_scores_gemma":[0.999625,0.00006266434,0.000009811682,0.00022469161,0.000014482341,0.00006330239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059536043,0.0002004661,0.00016422269,0.00019555612,0.000119867575,0.000056766836,0.00010126419,0.00003369095,0.00002446532],"category_scores_gemma":[6.748439e-7,0.00014701395,0.0000273948,0.00013619222,0.000027473943,0.00008633292,0.00007867035,0.00003199746,0.000010484036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009497247,0.000084986284,0.00009615648,0.00012820459,0.00057675055,0.0000812366,0.0005288842,0.9837479,0.00016193518,0.0064253514,0.0038125657,0.0042610466],"study_design_scores_gemma":[0.0022212006,0.00035205617,0.0016985117,0.00001919782,0.00007255614,0.000005485261,0.0032312544,0.97467446,0.0015894572,0.00005431054,0.015754474,0.00032705668],"about_ca_topic_score_codex":0.0002474456,"about_ca_topic_score_gemma":0.00012773425,"teacher_disagreement_score":0.09084618,"about_ca_system_score_codex":0.00011589607,"about_ca_system_score_gemma":0.0000040424475,"threshold_uncertainty_score":0.59950554},"labels":[],"label_agreement":null},{"id":"W4388239694","doi":"10.2139/ssrn.4621261","title":"Novel Building-to-Grid Linked Model Framework to Optimize Demand-Response Scheduling with a Case Study of Regina, Saskatchewan","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Grid; Scheduling (production processes); Computer science; Distributed computing; Operations research; Demand response; Industrial engineering; Operations management; Economics; Geography; Engineering; Electrical engineering","score_opus":0.01969543951577039,"score_gpt":0.26082947020370645,"score_spread":0.24113403068793607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388239694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49690977,0.00017586527,0.50096923,0.00048710653,0.00056975574,0.0006254717,0.000007904822,0.0002495093,0.000005407429],"genre_scores_gemma":[0.87699795,0.00019954315,0.12114088,0.000055970624,0.0006534636,0.00022512062,0.0000034879947,0.0003303052,0.0003932973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946217,0.00014795041,0.00073981704,0.0008084123,0.00082301005,0.0028591352],"domain_scores_gemma":[0.9976629,0.00024110722,0.0002871718,0.0011658213,0.00023270096,0.0004103167],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.003716652,0.00079126586,0.00096622395,0.0011126657,0.00020494132,0.00017348856,0.0010506288,0.0003829045,0.000003229422],"category_scores_gemma":[0.00022741142,0.0007793582,0.00022520228,0.0008409799,0.000028400393,0.00011035777,0.00084456085,0.0061664633,0.000013059987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008296737,0.00020186305,0.000082048995,0.00009052369,0.0017842362,0.00056614133,0.0038678062,0.9912393,0.00050907367,0.00040100224,0.00010421855,0.0003241127],"study_design_scores_gemma":[0.002652864,0.0020100947,0.00011629236,0.0013885923,0.00075663894,0.0028173258,0.032692093,0.9510426,0.00017264477,0.004645054,0.00009135472,0.0016144615],"about_ca_topic_score_codex":0.0004865054,"about_ca_topic_score_gemma":0.0049232976,"teacher_disagreement_score":0.38008818,"about_ca_system_score_codex":0.0024893796,"about_ca_system_score_gemma":0.0019777918,"threshold_uncertainty_score":0.99946576},"labels":[],"label_agreement":null},{"id":"W4388283479","doi":"10.1016/j.enbuild.2023.113707","title":"Development of prediction models for thermostat override behavior in direct load control events","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Carleton University; Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Thermostat; Control (management); Cluster analysis; Thermal comfort; Computer science; Simulation; Engineering; Machine learning; Artificial intelligence; Mechanical engineering","score_opus":0.011164271844103294,"score_gpt":0.20700146318094628,"score_spread":0.195837191336843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388283479","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96940905,0.00013795683,0.028947942,0.00001403322,0.00031917138,0.00013104596,0.000019196994,0.00018755614,0.0008340255],"genre_scores_gemma":[0.9981451,0.00012336904,0.0011729182,0.000016045386,0.00003378182,0.0002547675,0.000019478475,0.000022874025,0.0002116332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934626,0.000006336495,0.00020612015,0.00013687185,0.00012408248,0.00018034605],"domain_scores_gemma":[0.99981767,0.00003403569,0.000023585122,0.00007735646,0.000017144375,0.000030204876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018151203,0.00010248651,0.00013793269,0.00011918028,0.00003217235,0.000005810652,0.00005959845,0.000047295587,0.0000037865861],"category_scores_gemma":[0.000007495836,0.000103460196,0.000027740234,0.00014871477,0.000008820566,0.00010087892,0.00002627408,0.000026471876,4.8701304e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005830893,0.000038079073,0.0024805097,0.00006292234,0.00009548193,0.0000035196933,0.0004984789,0.9514587,0.01996398,0.0041099535,0.0013707272,0.019859338],"study_design_scores_gemma":[0.0032466059,0.00007729058,0.054001678,0.00017139765,0.00007595129,0.0000016637837,0.00013550764,0.79376876,0.05617555,0.0012876844,0.09058691,0.0004710149],"about_ca_topic_score_codex":0.00004150896,"about_ca_topic_score_gemma":0.00008133785,"teacher_disagreement_score":0.15768994,"about_ca_system_score_codex":0.00008058708,"about_ca_system_score_gemma":0.000012579421,"threshold_uncertainty_score":0.42189842},"labels":[],"label_agreement":null},{"id":"W4388327937","doi":"10.1145/3600100.3626257","title":"CityLearn v2: An OpenAI Gym environment for demand response control benchmarking in grid-interactive communities","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Benchmarking; Flexibility (engineering); Computer science; Grid; Demand response; Distributed computing; Control (management); Virtual power plant; Distributed generation; Electricity; Engineering; Renewable energy","score_opus":0.01573724151200438,"score_gpt":0.23153771224360054,"score_spread":0.21580047073159617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388327937","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95033306,0.00003897694,0.044028874,0.00036378094,0.0009251988,0.00070997,0.000029224339,0.00052815606,0.0030427717],"genre_scores_gemma":[0.9978263,0.000066832,0.00081177393,0.00015197585,0.00016190534,0.00030217276,0.00005986941,0.000046480698,0.00057273835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990115,0.00015978499,0.00022268809,0.0001463915,0.00012971861,0.00032990903],"domain_scores_gemma":[0.9989601,0.0006221272,0.000021723265,0.00032973714,0.000008656835,0.000057663692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008201883,0.00016425415,0.00019599532,0.00025987413,0.00008092947,0.00005977888,0.00022585536,0.00004885222,0.00021951568],"category_scores_gemma":[0.000025159317,0.00017008692,0.00004725018,0.00012312863,0.000026834874,0.00024896913,0.000104306964,0.00014003241,0.0000629775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002977786,0.000029234916,0.0014020712,0.000024471481,0.00007352921,0.000011965865,0.0013170976,0.99135435,0.00052626897,0.00016040754,0.003853868,0.00094897836],"study_design_scores_gemma":[0.0015853425,0.00016432408,0.054557603,0.00004184622,0.000018254548,0.0000014549488,0.0036262183,0.8727463,0.0006974911,0.00007192089,0.0661939,0.00029533057],"about_ca_topic_score_codex":0.00019157503,"about_ca_topic_score_gemma":0.00055773486,"teacher_disagreement_score":0.11860801,"about_ca_system_score_codex":0.00018624593,"about_ca_system_score_gemma":0.0000058139767,"threshold_uncertainty_score":0.69359434},"labels":[],"label_agreement":null},{"id":"W4388561794","doi":"10.1109/etcm58927.2023.10308985","title":"On the Impacts of Multi-Agent Transactive Energy in Distribution Networks - Part 2: Integrated ETSim Results and Findings","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mitacs","keywords":"Distributed generation; Transactive memory; Computer science; Renewable energy; Grid; Distributed computing; Tariff; Electricity; Risk analysis (engineering); Environmental economics; Reliability engineering; Business; Engineering; Knowledge management","score_opus":0.013756464631511912,"score_gpt":0.20775844013569064,"score_spread":0.19400197550417872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388561794","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9255281,0.0000557949,0.07159294,0.0004250535,0.00043708144,0.00018760079,0.00008184687,0.00031931675,0.0013722721],"genre_scores_gemma":[0.99931777,0.00030489362,0.000014844409,0.00003509975,0.000015942249,0.000024869407,0.00013267102,0.000014152501,0.0001397443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993171,0.000034323235,0.00020701735,0.00013323616,0.00009741889,0.00021087936],"domain_scores_gemma":[0.99960774,0.00018080817,0.000017238144,0.00014318942,0.000013711323,0.000037303547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026193348,0.000118683995,0.00011661591,0.00007783801,0.000024835628,0.00001420749,0.00007378215,0.00005737065,0.000017075197],"category_scores_gemma":[0.000050790917,0.00008260495,0.000027074793,0.0004987243,0.000025500838,0.00004828629,0.00001717977,0.00010715142,0.000003589458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050789753,0.000022270222,0.00011018484,0.000008690942,0.000049624778,0.000005769058,0.00021368075,0.9827965,0.00017827307,0.0030495636,0.011778316,0.001736363],"study_design_scores_gemma":[0.00065649254,0.000043338772,0.021941382,0.00007496853,0.000008722569,2.9352566e-7,0.00024570327,0.96696436,0.006176177,0.00004324226,0.0037262472,0.00011905544],"about_ca_topic_score_codex":0.00035724824,"about_ca_topic_score_gemma":0.0006640404,"teacher_disagreement_score":0.07378969,"about_ca_system_score_codex":0.00008581537,"about_ca_system_score_gemma":0.000003985303,"threshold_uncertainty_score":0.33685324},"labels":[],"label_agreement":null},{"id":"W4388562058","doi":"10.1109/etcm58927.2023.10309090","title":"On the Impacts of Multi-Agent Transactive Energy in Distribution Networks - Part 1: GTSPF Construction and ETSim Integration","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mitacs","keywords":"Python (programming language); Distributed generation; Computer science; Distributed computing; Grid; Transactive memory; Electricity; Solver; Systems engineering; Renewable energy; Engineering; Operating system; Knowledge management","score_opus":0.011619456959814242,"score_gpt":0.20210075001276853,"score_spread":0.1904812930529543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388562058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34890625,0.000043376553,0.64875066,0.00016751027,0.0005678181,0.0001444827,0.000012249078,0.00019024618,0.0012173823],"genre_scores_gemma":[0.99942327,0.00033713575,0.00005759265,0.000021485206,0.000026579904,0.000030226087,0.00006619604,0.000009442972,0.000028068493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950975,0.00003277464,0.00015130921,0.000095283685,0.000081333805,0.0001295578],"domain_scores_gemma":[0.99976283,0.00008249855,0.000018889314,0.00009892442,0.000012979658,0.000023860917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014501152,0.00008928559,0.000085861306,0.00006507678,0.000024328849,0.000012340055,0.000036755926,0.000047087746,0.00002063925],"category_scores_gemma":[0.000016498028,0.000065426226,0.000022182783,0.00029178782,0.00003149401,0.00006779575,0.000008545782,0.00007451967,0.0000021013873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013312584,0.000014425596,0.00015954576,0.000008494773,0.000032500906,9.891766e-7,0.00014577302,0.95794207,0.00040801018,0.02304576,0.001745074,0.016484026],"study_design_scores_gemma":[0.00027873908,0.000028859387,0.009910806,0.00003967997,0.0000089508385,6.841354e-7,0.0004814044,0.97958463,0.008559523,0.00019356863,0.0008285955,0.000084555606],"about_ca_topic_score_codex":0.00016145814,"about_ca_topic_score_gemma":0.0005395026,"teacher_disagreement_score":0.65051705,"about_ca_system_score_codex":0.000075437405,"about_ca_system_score_gemma":0.0000029812097,"threshold_uncertainty_score":0.2668004},"labels":[],"label_agreement":null},{"id":"W4388570960","doi":"10.1016/j.enbuild.2023.113722","title":"Multi-stage optimization for energy management and trading for smart homes considering operational constraints of a distribution network","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Distributed generation; News aggregator; Energy management; Energy management system; Computer science; Reliability engineering; Integer programming; Smart grid; Operations research; Engineering; Energy (signal processing); Renewable energy; Electrical engineering","score_opus":0.018637406592740827,"score_gpt":0.22443773612093953,"score_spread":0.2058003295281987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388570960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026431987,0.00031600273,0.97236687,0.00006619269,0.00030094897,0.00014144459,0.00007427811,0.00020579125,0.000096509655],"genre_scores_gemma":[0.92188895,0.00095655577,0.07540426,0.00006713048,0.00014541364,0.00029187775,0.00062916894,0.000050336184,0.000566333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992717,0.00000839896,0.00021292527,0.00020339516,0.00007464513,0.00022891573],"domain_scores_gemma":[0.99971163,0.0001030353,0.000037442464,0.00007241919,0.000029088642,0.000046356025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017556027,0.00013628778,0.00016336757,0.00008496213,0.0001348285,0.000041584117,0.000044532855,0.000054951128,0.000009882896],"category_scores_gemma":[0.000015231602,0.0001499516,0.000038529666,0.00015475857,0.000064420936,0.00011541758,0.000044064684,0.000019735355,6.39802e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013855414,0.000007274266,0.00018073368,0.00013341506,0.00011363399,0.0000013492158,0.000026378442,0.87411916,0.00037695098,0.11636417,0.0036382603,0.0050247903],"study_design_scores_gemma":[0.00088319194,0.000029230467,0.0004028407,0.00006434474,0.000036508667,0.0000018959763,0.000070440474,0.94140947,0.0026921625,0.00035348363,0.053884014,0.00017242308],"about_ca_topic_score_codex":0.000013841738,"about_ca_topic_score_gemma":0.000019353176,"teacher_disagreement_score":0.8969626,"about_ca_system_score_codex":0.000028861845,"about_ca_system_score_gemma":0.000004789174,"threshold_uncertainty_score":0.6114849},"labels":[],"label_agreement":null},{"id":"W4388579551","doi":"10.1109/tsg.2023.3331714","title":"A Decentralised Transactive Energy Market Considering Physical System Constraints","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Prosumer; Computer science; Database transaction; Distributed generation; Energy market; Network congestion; Electric power system; Demand response; Game theory; Distributed computing; Risk analysis (engineering); Electricity; Business; Microeconomics; Computer network; Economics; Power (physics); Engineering","score_opus":0.011405117686516473,"score_gpt":0.20237740005892266,"score_spread":0.19097228237240618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388579551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06779883,0.000024936164,0.8956347,0.00015762953,0.008945644,0.00040820314,0.0002839018,0.005349125,0.021397011],"genre_scores_gemma":[0.99849176,0.0000915256,0.00020656166,0.00007150758,0.00028361898,0.00027279605,0.000013551299,0.00011853521,0.00045012138],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99798554,0.00008743939,0.00036102085,0.0004475961,0.00041150983,0.0007068625],"domain_scores_gemma":[0.99898887,0.00024155778,0.000034504126,0.00045325843,0.000043253604,0.00023854757],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015959298,0.0004204648,0.00041523256,0.00041625093,0.00020319234,0.00006682086,0.0002175453,0.0001211893,0.0002597111],"category_scores_gemma":[0.000002520475,0.0004617009,0.00027330915,0.00079094747,0.00014264349,0.00020363668,0.0000017938926,0.0002993409,0.00031345573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007433505,0.00011110407,0.000008725055,0.00018723776,0.0005985517,0.0001808328,0.00043496082,0.9713554,0.0032853717,0.0004725339,0.011519606,0.011771372],"study_design_scores_gemma":[0.0021139216,0.000119640084,0.00045135908,0.00027111944,0.00026213232,0.0000756749,0.0010751255,0.8475315,0.12008198,0.000053256266,0.026853142,0.001111163],"about_ca_topic_score_codex":0.000049388284,"about_ca_topic_score_gemma":0.000066411194,"teacher_disagreement_score":0.930693,"about_ca_system_score_codex":0.000308581,"about_ca_system_score_gemma":0.000032813958,"threshold_uncertainty_score":0.99978346},"labels":[],"label_agreement":null},{"id":"W4388723264","doi":"10.1016/j.energy.2023.129673","title":"Demand response programs: Comparing price signals and direct load control","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Demand response; Flexibility (engineering); Electrification; Environmental economics; Renewable energy; Electric power system; Load management; Peak demand; Supply network; Variable renewable energy; Base load power plant; Demand management; Supply and demand; Economics; Computer science; Electricity; Engineering; Power (physics); Distributed generation; Microeconomics; Electrical engineering","score_opus":0.011695708372070734,"score_gpt":0.2030261206936975,"score_spread":0.19133041232162676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388723264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9458726,0.0018068741,0.01735823,0.00023964365,0.0007924038,0.0001969219,0.0000031356221,0.0030905902,0.03063961],"genre_scores_gemma":[0.99816734,0.00013223816,0.000087001354,0.000063638014,0.00010481898,0.000096188945,0.0000063421176,0.000041168023,0.0013012618],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990525,0.000071264374,0.00016496395,0.00019583182,0.00018769031,0.0003277282],"domain_scores_gemma":[0.9995025,0.00016491824,0.000019232435,0.00020216797,0.00002067281,0.000090502625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045425264,0.00015143298,0.00020279689,0.00012273059,0.000057584322,0.00005998054,0.00010850364,0.00004521929,0.000033381762],"category_scores_gemma":[0.000043758224,0.00015341748,0.00003435436,0.00033872286,0.000026259639,0.00007697376,0.00006154341,0.000054693017,0.000046820176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106483116,0.0000151455215,0.0018690896,0.00003776982,0.0001629138,0.000060396713,0.00015277645,0.9805279,0.0049475674,0.00067512254,0.007577687,0.0038671652],"study_design_scores_gemma":[0.0011878209,0.00007199359,0.022719571,0.00005572382,0.000036804886,0.000005364531,0.000060773873,0.5562507,0.0037653833,0.000100084435,0.4153477,0.00039813135],"about_ca_topic_score_codex":0.00004743368,"about_ca_topic_score_gemma":0.00005740851,"teacher_disagreement_score":0.42427722,"about_ca_system_score_codex":0.000070345,"about_ca_system_score_gemma":0.0000101307705,"threshold_uncertainty_score":0.62561834},"labels":[],"label_agreement":null},{"id":"W4388766963","doi":"10.1016/j.enbuild.2023.113750","title":"Enhancing energy flexibility of building clusters via supervisory room temperature control: Quantification and evaluation of benefits","year":2023,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; École de Technologie Supérieure; Natural Resources Canada","funders":"Office of Energy Research and Development; Natural Resources Canada","keywords":"Flexibility (engineering); Grid; Incentive; Electrification; Work (physics); Context (archaeology); Efficient energy use; Renewable energy; Computer science; Smart grid; Architectural engineering; Electricity; Simulation; Environmental economics; Engineering; Economics; Mechanical engineering; Electrical engineering","score_opus":0.02126555775455837,"score_gpt":0.23295134406955606,"score_spread":0.21168578631499768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388766963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9845883,0.0019728711,0.012702287,0.000066151726,0.00031349628,0.00007065013,0.0000074395602,0.00014459196,0.00013416761],"genre_scores_gemma":[0.9987393,0.0006071394,0.00042793778,0.000030899133,0.00007556159,0.000030955016,0.000028488515,0.000028767345,0.000030976153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998709,0.00007318738,0.00038315312,0.00029639128,0.00033003278,0.0002082097],"domain_scores_gemma":[0.9993694,0.00011653254,0.00008166004,0.00023994467,0.00013527967,0.00005717096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096775254,0.00017802739,0.00027104406,0.00025672652,0.00007254876,0.000021527412,0.000100500365,0.00012607707,0.000008272001],"category_scores_gemma":[0.00005390992,0.00018381694,0.000047550733,0.0003963793,0.000049762133,0.00019372857,0.00006112437,0.0000610242,2.0460985e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001889957,0.000011645529,0.00041004797,0.00010366404,0.000076896344,3.340456e-7,0.00014090288,0.605043,0.36713743,0.012555442,0.00010699254,0.014394713],"study_design_scores_gemma":[0.0008655403,0.000046559082,0.009808418,0.00014759623,0.00012974378,0.0000027174915,0.00013210581,0.49813414,0.4881121,0.0013467141,0.0010149181,0.00025945785],"about_ca_topic_score_codex":0.00024453516,"about_ca_topic_score_gemma":0.00019722978,"teacher_disagreement_score":0.120974645,"about_ca_system_score_codex":0.00004470478,"about_ca_system_score_gemma":0.000012697311,"threshold_uncertainty_score":0.7495837},"labels":[],"label_agreement":null},{"id":"W4388820405","doi":"10.1109/tia.2023.3334218","title":"A Data-Driven Framework for Quantifying Demand Response Participation Benefit of Industrial Consumers","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Engineering and Physical Sciences Research Council; Science Foundation Ireland","keywords":"Flexibility (engineering); Factory (object-oriented programming); Smart grid; Demand response; Renewable energy; Electricity; Computer science; Electronics; Grid; Incentive; Environmental economics; Industrial engineering; Operations research; Engineering; Electrical engineering; Economics; Mathematics","score_opus":0.1556342422874136,"score_gpt":0.34860859407840217,"score_spread":0.19297435179098857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388820405","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13302037,0.000008291881,0.8636065,0.00032816103,0.0004708457,0.00081395067,0.0011761333,0.0005094952,0.000066274144],"genre_scores_gemma":[0.9932973,0.00002814716,0.003877961,0.000023596984,0.00011448232,0.00234915,0.00015038386,0.000053415613,0.00010559021],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875146,0.000037421294,0.00041560832,0.00031660323,0.00019148804,0.00028741767],"domain_scores_gemma":[0.9981133,0.0007839649,0.00007481378,0.0008713863,0.000056082885,0.00010046369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037266096,0.00017027484,0.00019419381,0.00031379645,0.00020848936,0.00002874155,0.00035832005,0.00041901422,0.000059821195],"category_scores_gemma":[0.000032954278,0.00020345906,0.00006614444,0.0010448603,0.00006645572,0.00015239352,0.0000049937657,0.0005038885,0.000051198567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010376366,0.00007119976,0.000094869785,0.000035486122,0.00016112116,4.2649984e-7,0.00008115137,0.98686564,0.0011027203,0.0013867186,0.0016147714,0.008482104],"study_design_scores_gemma":[0.0019621367,0.00016882861,0.0025345099,0.00026812693,0.0006019928,0.0000029200885,0.00075360516,0.8819771,0.043683663,0.0016201957,0.06560945,0.0008174781],"about_ca_topic_score_codex":0.000012006993,"about_ca_topic_score_gemma":0.000026137099,"teacher_disagreement_score":0.86027694,"about_ca_system_score_codex":0.00007845589,"about_ca_system_score_gemma":0.000041312953,"threshold_uncertainty_score":0.829682},"labels":[],"label_agreement":null},{"id":"W4388856320","doi":"10.1109/naps58826.2023.10318626","title":"Enabling Peer-to-Peer Transactions in Measurement-Based Distribution System Market","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constraint (computer-aided design); Peer-to-peer; Computer science; Electricity; Market power; Key (lock); Mathematical optimization; Microeconomics; Distributed computing; Economics; Computer security; Engineering","score_opus":0.02068697924222743,"score_gpt":0.20785175374654657,"score_spread":0.18716477450431915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388856320","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013844033,0.000016675758,0.9579987,0.0016375273,0.0014098785,0.00034699004,0.00003862344,0.0026502982,0.022057278],"genre_scores_gemma":[0.9964815,0.0000022297074,0.0002904354,0.000030026726,0.000058398044,0.00015536566,0.0000639843,0.000032242864,0.0028858592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985191,0.000027332697,0.00022678472,0.00017980234,0.0007191049,0.000327831],"domain_scores_gemma":[0.9995504,0.000027257955,0.000008972031,0.00022177854,0.000111475296,0.00008010294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010543937,0.00013419767,0.0001279518,0.00026164972,0.000049304937,0.000048747996,0.00012431435,0.000049800823,0.00020386314],"category_scores_gemma":[0.000043206863,0.00014360563,0.00005020073,0.0009925992,0.0000049542996,0.00007886103,0.000008869329,0.00009412213,0.00025044585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060290204,0.000010664736,0.00011338703,0.00011650826,0.000026609236,0.0000102331505,0.000027787744,0.9583246,0.00049836223,0.00020294686,0.039341703,0.0013211305],"study_design_scores_gemma":[0.0004539115,0.0000112488715,0.0063510016,0.000093001894,0.00001918794,6.465119e-7,0.00048365694,0.8421489,0.004204332,0.000003054024,0.14599848,0.00023258841],"about_ca_topic_score_codex":0.00010631887,"about_ca_topic_score_gemma":0.0003518388,"teacher_disagreement_score":0.9826374,"about_ca_system_score_codex":0.0006757536,"about_ca_system_score_gemma":0.000014610329,"threshold_uncertainty_score":0.58560675},"labels":[],"label_agreement":null},{"id":"W4389035955","doi":"10.36227/techrxiv.24585051.v1","title":"Towards Harmonious Decentralization of Energy Systems: A Vision of Interoperable Peer-to-Peer Energy Markets","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prosumer; Interoperability; Scalability; Decentralization; Computer science; Orchestration; Distributed computing; Distributed generation; Grid; Peer-to-peer; Energy market; Smart grid; Process management; Business; Electricity; Engineering; Renewable energy; Economics; World Wide Web","score_opus":0.01729714056473966,"score_gpt":0.23884319089995928,"score_spread":0.22154605033521962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389035955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01587034,0.0008950575,0.9390251,0.00054627436,0.0110630505,0.00043975376,0.00012221478,0.0013182755,0.03071992],"genre_scores_gemma":[0.97331446,0.0011010136,0.0016396221,0.00005167643,0.0001991945,0.0001840373,0.00041731214,0.00020500574,0.022887692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969037,0.00010503041,0.0010006349,0.0005290343,0.0010357898,0.0004257866],"domain_scores_gemma":[0.99808615,0.000046778117,0.00016693903,0.0009241774,0.0006244546,0.00015147786],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053092773,0.00046794306,0.0007552107,0.0006775766,0.000023516763,0.000082255494,0.0006508415,0.0003288369,0.0001450102],"category_scores_gemma":[0.00010202404,0.0004637296,0.0001919865,0.00045315767,0.00002775184,0.00008682509,0.001052857,0.00016372788,0.000015297957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026287029,0.000042782034,0.000063083695,0.00094098476,0.0003688141,0.000008861614,0.00012487748,0.87812597,0.0007250628,0.0033796418,0.114009,0.0021846432],"study_design_scores_gemma":[0.0004457474,0.00009078211,0.001160979,0.0013884258,0.00013010253,0.0000030000526,0.00015532193,0.7999752,0.031050121,0.0002308709,0.16465054,0.00071891455],"about_ca_topic_score_codex":0.00507345,"about_ca_topic_score_gemma":0.00026512452,"teacher_disagreement_score":0.95744413,"about_ca_system_score_codex":0.00032522285,"about_ca_system_score_gemma":0.00005377734,"threshold_uncertainty_score":0.9997814},"labels":[],"label_agreement":null},{"id":"W4389036032","doi":"10.36227/techrxiv.24585051","title":"Towards Harmonious Decentralization of Energy Systems: A Vision of Interoperable Peer-to-Peer Energy Markets","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prosumer; Interoperability; Scalability; Computer science; Decentralization; Orchestration; Distributed computing; Grid; Distributed generation; Smart grid; Energy market; Peer-to-peer; Process management; Risk analysis (engineering); Business; Electricity; Engineering; Renewable energy; Economics; World Wide Web","score_opus":0.01729714056473966,"score_gpt":0.23884319089995928,"score_spread":0.22154605033521962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389036032","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01587034,0.0008950575,0.9390251,0.00054627436,0.0110630505,0.00043975376,0.00012221478,0.0013182755,0.03071992],"genre_scores_gemma":[0.97331446,0.0011010136,0.0016396221,0.00005167643,0.0001991945,0.0001840373,0.00041731214,0.00020500574,0.022887692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969037,0.00010503041,0.0010006349,0.0005290343,0.0010357898,0.0004257866],"domain_scores_gemma":[0.99808615,0.000046778117,0.00016693903,0.0009241774,0.0006244546,0.00015147786],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053092773,0.00046794306,0.0007552107,0.0006775766,0.000023516763,0.000082255494,0.0006508415,0.0003288369,0.0001450102],"category_scores_gemma":[0.00010202404,0.0004637296,0.0001919865,0.00045315767,0.00002775184,0.00008682509,0.001052857,0.00016372788,0.000015297957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026287029,0.000042782034,0.000063083695,0.00094098476,0.0003688141,0.000008861614,0.00012487748,0.87812597,0.0007250628,0.0033796418,0.114009,0.0021846432],"study_design_scores_gemma":[0.0004457474,0.00009078211,0.001160979,0.0013884258,0.00013010253,0.0000030000526,0.00015532193,0.7999752,0.031050121,0.0002308709,0.16465054,0.00071891455],"about_ca_topic_score_codex":0.00507345,"about_ca_topic_score_gemma":0.00026512452,"teacher_disagreement_score":0.95744413,"about_ca_system_score_codex":0.00032522285,"about_ca_system_score_gemma":0.00005377734,"threshold_uncertainty_score":0.9997814},"labels":[],"label_agreement":null},{"id":"W4389039452","doi":"10.1016/j.apenergy.2023.122359","title":"From buildings to cities: How household demographics shape demand response and energy consumption","year":2023,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada; Concordia University; Canada Excellence Research Chairs, Government of Canada","keywords":"Occupancy; Consumption (sociology); Energy consumption; Demand response; Thermostat; Nexus (standard); Context (archaeology); Renewable energy; Archetype; Economics; Business; Environmental economics; Electricity; Engineering; Geography; Civil engineering; Sociology","score_opus":0.015784400091867604,"score_gpt":0.19488195196742944,"score_spread":0.17909755187556184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389039452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.958843,0.00024429578,0.03703141,0.0003518844,0.0005081101,0.000054342476,0.000034276436,0.0017138231,0.0012188598],"genre_scores_gemma":[0.9959699,0.0011994323,0.0010192263,0.00059099915,0.00031049972,0.00022102805,0.00007251136,0.00011942724,0.00049697084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985851,0.000032944048,0.00020971382,0.00044072542,0.0002649775,0.00046656167],"domain_scores_gemma":[0.99908835,0.00025844193,0.00003136962,0.00039964326,0.000014751495,0.00020743592],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021351098,0.0003029449,0.00026025024,0.00051917153,0.00010896796,0.00012556114,0.00021804836,0.00015666513,0.000035405912],"category_scores_gemma":[0.000016112906,0.00034488508,0.000050179086,0.0006503292,0.00006299199,0.00009105215,0.00019365927,0.00009155367,0.0000196001],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003235689,0.000025226223,0.0006714677,0.00006481919,0.0004034277,0.00006356118,0.0005571428,0.74636084,0.07467875,0.062267452,0.09409435,0.020489382],"study_design_scores_gemma":[0.0012501859,0.00008006769,0.017472884,0.000071466326,0.00010150085,0.0000051737884,0.00044116075,0.088873126,0.02034301,0.002657693,0.8674359,0.0012678601],"about_ca_topic_score_codex":0.0001240992,"about_ca_topic_score_gemma":0.000093065224,"teacher_disagreement_score":0.77334154,"about_ca_system_score_codex":0.000062905216,"about_ca_system_score_gemma":0.000007674986,"threshold_uncertainty_score":0.99990034},"labels":[],"label_agreement":null},{"id":"W4389074848","doi":"10.1007/s10994-023-06460-4","title":"Multi-agent reinforcement learning for fast-timescale demand response of residential loads","year":2023,"lang":"en","type":"article","venue":"Machine Learning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université de Montréal; Polytechnique Montréal; Mila - Quebec Artificial Intelligence Institute","funders":"Natural Sciences and Engineering Research Council of Canada; Samsung; Institut de Valorisation des Données; Microsoft Research","keywords":"Reinforcement learning; Computer science; Demand response; Renewable energy; Distributed computing; Power (physics); Artificial intelligence; Engineering; Electrical engineering; Electricity","score_opus":0.01256083026442792,"score_gpt":0.24168967895844878,"score_spread":0.22912884869402086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389074848","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6075171,0.0002676276,0.3884405,0.0001571841,0.00080652075,0.00049889705,0.00000362073,0.0014260482,0.00088248047],"genre_scores_gemma":[0.9829456,0.00007661959,0.0021292858,0.000016082706,0.00013379495,0.0000937915,0.00009296183,0.00009784589,0.014414022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837303,0.00015058092,0.0004409916,0.0002665637,0.0002989005,0.0004699039],"domain_scores_gemma":[0.9992807,0.00025447118,0.00009385261,0.00024056279,0.000044792163,0.00008561288],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012133769,0.00023220392,0.00028345754,0.00038862517,0.00019164999,0.000040947845,0.00020542875,0.00007877451,0.00013725933],"category_scores_gemma":[0.0003869203,0.00025236944,0.00014337561,0.00041175014,0.000029696797,0.00010108213,0.0001878374,0.00028480185,0.0001058407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020161239,0.00001023163,0.0041576023,0.00015835045,0.00011010813,0.000011844626,0.00061046483,0.96694547,0.024855325,0.000024876015,0.0017042215,0.001209868],"study_design_scores_gemma":[0.0011849427,0.00016289236,0.013125025,0.000056359193,0.000040572148,0.0000016612905,0.00016820093,0.93442655,0.0077627357,0.000005450216,0.042823996,0.00024163598],"about_ca_topic_score_codex":0.000058252073,"about_ca_topic_score_gemma":0.000020898335,"teacher_disagreement_score":0.3863112,"about_ca_system_score_codex":0.00009503617,"about_ca_system_score_gemma":0.000013121608,"threshold_uncertainty_score":0.99999285},"labels":[],"label_agreement":null},{"id":"W4389191124","doi":"10.22215/etd/2023-15858","title":"Multi-Agent Reinforcement Learning Based User-Centric Demand Response via Non-Intrusive Load Monitoring","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Demand response; Reinforcement learning; Computer science; Incentive; Scheduling (production processes); Load management; Reinforcement; On demand; Real-time computing; Response time; Electricity; Engineering; Multimedia; Artificial intelligence; Operations management; Operating system","score_opus":0.011109175144258476,"score_gpt":0.24108545791297162,"score_spread":0.22997628276871315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389191124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63159573,0.0006544281,0.32909343,0.000048785547,0.023877095,0.0023241404,0.000005585752,0.005187188,0.0072136023],"genre_scores_gemma":[0.88386214,0.0004517989,0.0025994962,0.000026305348,0.0005952427,0.0005224152,0.00064039207,0.0004534257,0.1108488],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99711883,0.000088207846,0.0006809389,0.0005640567,0.00081748754,0.0007304609],"domain_scores_gemma":[0.9987257,0.00021650847,0.00015574435,0.0005385494,0.00016786625,0.00019559333],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006137999,0.0006654246,0.0004883051,0.0007182461,0.00019511761,0.00012863183,0.00036701796,0.0003395722,0.00024882477],"category_scores_gemma":[0.00018475443,0.00073317153,0.00021675431,0.0006673769,0.0000108210625,0.00012865644,0.00008021156,0.00060460635,0.00092922105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025996464,0.000021271875,0.0004209935,0.00043189913,0.00028613268,0.000103194776,0.00057813927,0.9909596,0.0041319807,0.0000019411646,0.001980333,0.00082456495],"study_design_scores_gemma":[0.0015325295,0.000091891365,0.027573675,0.0005082299,0.00019231845,7.936037e-7,0.0012619594,0.9249388,0.029145507,9.900563e-7,0.013744821,0.0010084781],"about_ca_topic_score_codex":0.00020878795,"about_ca_topic_score_gemma":0.000119990465,"teacher_disagreement_score":0.32649395,"about_ca_system_score_codex":0.0013105673,"about_ca_system_score_gemma":0.00010751266,"threshold_uncertainty_score":0.99984866},"labels":[],"label_agreement":null},{"id":"W4389223831","doi":"10.1088/1742-6596/2600/5/052003","title":"Exploring thermostat override behavior during direct load control events","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Carleton University; Concordia University","funders":"","keywords":"Thermostat; Control (management); Computer science; Cluster analysis; Engineering; Artificial intelligence","score_opus":0.05212069771814409,"score_gpt":0.22560526404845205,"score_spread":0.17348456633030795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389223831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99481076,0.00004668323,0.0018186461,0.00006583095,0.0015123743,0.000089160334,0.00000989953,0.0002003576,0.0014462612],"genre_scores_gemma":[0.99852586,0.00063488795,0.000067567045,0.000008303791,0.0004621207,0.0000337107,0.0000018370224,0.000042950986,0.00022275194],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99880296,0.000026639587,0.0003427276,0.00010513948,0.00042330057,0.0002992244],"domain_scores_gemma":[0.999412,0.00003778123,0.00012092205,0.00018559146,0.00015808578,0.00008563268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016903489,0.00018989753,0.00030531685,0.00009248067,0.00007025877,0.00005787205,0.00022845923,0.000026038972,0.000029871357],"category_scores_gemma":[0.000025836729,0.0001803563,0.00012322809,0.00025767472,0.00002787911,0.0010908246,0.000052378044,0.00019736233,0.000038687398],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002689815,0.00014635775,0.016068293,0.00038636767,0.001144819,0.0006879645,0.00416541,0.6534061,0.2504585,0.004502401,0.0011953951,0.06756942],"study_design_scores_gemma":[0.0028628202,0.00026353687,0.41711095,0.00058713934,0.00033369573,0.00005527663,0.0020466268,0.003907454,0.5654017,0.0018508835,0.004604157,0.0009757838],"about_ca_topic_score_codex":0.000007777582,"about_ca_topic_score_gemma":0.000007518593,"teacher_disagreement_score":0.64949864,"about_ca_system_score_codex":0.00014010497,"about_ca_system_score_gemma":0.000046207624,"threshold_uncertainty_score":0.73547167},"labels":[],"label_agreement":null},{"id":"W4389228627","doi":"10.37256/jeee.2220233795","title":"Power Consumption Minimization of a Low-Cost IoT Data Logger for Photovoltaic System","year":2023,"lang":"en","type":"article","venue":"Journal of Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Data logger; Microcontroller; Computer science; Embedded system; Battery (electricity); Power management; Real-time computing; Power (physics); Photovoltaic system; Sleep mode; Computer hardware; Electrical engineering; Automotive engineering; Engineering; Power consumption; Operating system","score_opus":0.014139744320565372,"score_gpt":0.22293128740862506,"score_spread":0.2087915430880597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389228627","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60817254,0.0047669704,0.38545322,0.000043527947,0.0008282577,0.00040916904,0.000021675636,0.00024722904,0.000057445784],"genre_scores_gemma":[0.9972801,0.001140791,0.0013616098,0.0000065093755,0.00012174266,0.0000104914625,0.000021208507,0.00004358115,0.0000139614995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989173,0.000007968528,0.00043313266,0.00012028655,0.00018093361,0.00034042113],"domain_scores_gemma":[0.9994448,0.00013015495,0.00009581825,0.0001775051,0.00007690641,0.0000748092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037532314,0.00013371673,0.0002734155,0.0003541821,0.00002459665,0.000023404666,0.00019021913,0.000073769144,0.0000030554177],"category_scores_gemma":[0.000094797666,0.00013054868,0.000057906804,0.0004297479,0.000007042509,0.00010536729,0.000036134246,0.00018539066,0.0000014035522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004073348,0.000018780649,0.00012441521,0.00047925155,0.00020737646,0.000007658513,0.000024783307,0.9617998,0.03076279,0.0015268123,0.0032034845,0.0018041212],"study_design_scores_gemma":[0.0005286093,0.000109517656,0.00073584105,0.00009062353,0.00005002338,0.000031472955,0.0000063916186,0.9844097,0.0054621114,0.00001433851,0.008433609,0.00012774917],"about_ca_topic_score_codex":6.9632745e-7,"about_ca_topic_score_gemma":6.621787e-7,"teacher_disagreement_score":0.38910758,"about_ca_system_score_codex":0.00015768019,"about_ca_system_score_gemma":0.000031232044,"threshold_uncertainty_score":0.53236204},"labels":[],"label_agreement":null},{"id":"W4389301235","doi":"10.1007/s12273-023-1074-5","title":"A novel non-intrusive load monitoring technique using semi-supervised deep learning framework for smart grid","year":2023,"lang":"en","type":"article","venue":"Building Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Thresholding; Smart grid; Computer science; Artificial intelligence; Deep learning; Energy consumption; Convolutional neural network; Supervised learning; Energy (signal processing); Data mining; Big data; Machine learning; Grid; Artificial neural network; Engineering","score_opus":0.02741511612930098,"score_gpt":0.2914233818112708,"score_spread":0.26400826568196983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389301235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3233674,0.000028277303,0.67384857,0.000010378115,0.0012154279,0.0004405712,0.0000022033662,0.0010244012,0.000062763866],"genre_scores_gemma":[0.8392345,0.000011242078,0.15934633,0.000007366327,0.0010733274,0.00017235361,0.00001835714,0.00011341941,0.000023152244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859697,0.00001645182,0.00031634985,0.0003204639,0.00028815187,0.00046160433],"domain_scores_gemma":[0.99907374,0.0004263351,0.00006654992,0.00025364172,0.000112658134,0.00006705636],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040274556,0.00024941147,0.0002208631,0.00030222483,0.00024436117,0.000092689304,0.00016137435,0.00019318926,0.000007751247],"category_scores_gemma":[0.00034227732,0.0003073958,0.000101904036,0.0007300274,0.0000130840035,0.00024528455,0.000091724,0.00026555997,0.000013785536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010724066,0.0000068516156,0.0016559794,0.00011671631,0.000049542887,0.0000028045763,0.00025422825,0.9209903,0.07450191,0.00025700417,0.000015834948,0.0021381406],"study_design_scores_gemma":[0.00034331504,0.000020700074,0.0021069827,0.00029052046,0.00003892028,0.0000015325568,0.00009750598,0.9757561,0.019094404,0.0006345587,0.0012938904,0.0003215429],"about_ca_topic_score_codex":0.000031661373,"about_ca_topic_score_gemma":0.000001466272,"teacher_disagreement_score":0.51586705,"about_ca_system_score_codex":0.00047667554,"about_ca_system_score_gemma":0.000015633057,"threshold_uncertainty_score":0.99993783},"labels":[],"label_agreement":null},{"id":"W4389309787","doi":"10.3389/fenrg.2023.1337268","title":"Editorial: Distributed learning, optimization, and control methods for future power grids","year":2023,"lang":"en","type":"editorial","venue":"Frontiers in Energy Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Control (management); Computer science; Artificial intelligence","score_opus":0.008915160579553345,"score_gpt":0.3174525269278155,"score_spread":0.3085373663482622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389309787","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.9547405e-7,0.0015423434,0.45025435,0.00005672419,0.54742056,0.00019954806,0.0001326687,0.00027177078,0.000121750476],"genre_scores_gemma":[0.000008100835,0.0072452566,0.028708939,0.000003482178,0.9582419,0.0010723437,0.002474982,0.00032999614,0.0019150021],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99564123,0.000726389,0.00053754466,0.00076337863,0.0011735376,0.0011579475],"domain_scores_gemma":[0.99672246,0.0017694689,0.00007183003,0.00052033673,0.0006971899,0.00021872285],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.003964448,0.0004803237,0.0007998289,0.0011205918,0.00022406342,0.00023097322,0.00067222863,0.0016139989,0.000016722925],"category_scores_gemma":[0.0033358028,0.00051768665,0.00012667422,0.0011651367,0.00015969864,0.00014742107,0.00024094719,0.0019526978,0.0000025231645],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056961893,0.000009543178,0.000014123765,0.00010111697,0.00018265432,0.000003404465,0.00003240852,0.44896498,0.0000017228438,0.000047067224,0.54942566,0.0011603733],"study_design_scores_gemma":[0.0011262133,0.00009322799,0.0000052454093,0.00005381272,0.00002856682,8.2833495e-8,0.0001787689,0.24240115,0.000009280425,0.00021729236,0.7555336,0.0003527787],"about_ca_topic_score_codex":0.00012016952,"about_ca_topic_score_gemma":0.000030423014,"teacher_disagreement_score":0.42154542,"about_ca_system_score_codex":0.0006938958,"about_ca_system_score_gemma":0.00016766672,"threshold_uncertainty_score":0.9997275},"labels":[],"label_agreement":null},{"id":"W4389404242","doi":"10.2139/ssrn.4655989","title":"Assessment of Renewable Power Generation Applied in Homestay Hotels: Energy and Cost-Benefit Considering Dynamic Occupancy Rates and Reservation Prices","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Occupancy; Reservation; Renewable energy; Environmental economics; Natural resource economics; Power (physics); Business; Economics; Computer science; Engineering; Architectural engineering; Electrical engineering","score_opus":0.01708438022923216,"score_gpt":0.2596673391034374,"score_spread":0.24258295887420525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389404242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9174964,0.0058421292,0.07485458,0.00012782792,0.0006040257,0.00033344547,0.000007551247,0.000118828415,0.0006152235],"genre_scores_gemma":[0.9608796,0.037517197,0.0010706784,0.000011283728,0.00009485152,0.0000916199,0.00006877493,0.000074410964,0.00019153085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976836,0.000041029016,0.0006041824,0.00037287633,0.00028973972,0.0010085739],"domain_scores_gemma":[0.99930024,0.000071014205,0.00024117318,0.00026266844,0.00006477618,0.00006011519],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012284537,0.00031815958,0.000432391,0.00055633846,0.000074717405,0.00013671737,0.00017447838,0.00019940935,0.0000050368603],"category_scores_gemma":[0.000021599264,0.0003439616,0.0000447812,0.00023333868,0.00003321219,0.00016868807,0.00025519764,0.0009743096,3.0325765e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000120195655,0.000017493858,0.005171626,0.0001367372,0.00033280224,0.000005534496,0.00011492038,0.9608329,0.0050794384,0.025623059,0.000062764455,0.002610695],"study_design_scores_gemma":[0.0019468738,0.0001904187,0.09651395,0.0004915049,0.000154732,0.000063264226,0.0013142934,0.7570052,0.0018081118,0.13858591,0.0008120278,0.0011136936],"about_ca_topic_score_codex":0.00048399696,"about_ca_topic_score_gemma":0.017452553,"teacher_disagreement_score":0.2038277,"about_ca_system_score_codex":0.001223273,"about_ca_system_score_gemma":0.0004111117,"threshold_uncertainty_score":0.99990124},"labels":[],"label_agreement":null},{"id":"W4389545142","doi":"10.1109/icee59167.2023.10334880","title":"Reliability-Based Design of Time-Varying Electricity Tariff","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Tariff; Reliability (semiconductor); Reliability engineering; Computer science; Electricity; Demand response; Energy management; Sensitivity (control systems); Energy consumption; Consumption (sociology); Smart grid; Energy (signal processing); Power (physics); Environmental economics; Engineering; Business; Economics","score_opus":0.013272982454265295,"score_gpt":0.1989605072604379,"score_spread":0.18568752480617262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389545142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12130409,0.000025004289,0.8501051,0.00007781216,0.00031208526,0.00029434575,0.0000019938227,0.002712673,0.025166878],"genre_scores_gemma":[0.98499167,0.0000149461985,0.013810985,0.000057205507,0.000042496926,0.000031326905,0.000012593106,0.000038187016,0.0010006106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992896,0.000027446908,0.00017654216,0.00013082125,0.00015344966,0.00022215849],"domain_scores_gemma":[0.99950624,0.00015003404,0.000013644467,0.00027123094,0.000024450677,0.000034421413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003147487,0.00009813507,0.00013089778,0.00017032764,0.000021945012,0.000008019039,0.00013039855,0.000041889998,0.0002192561],"category_scores_gemma":[0.000041738418,0.00009659794,0.000041520645,0.000716163,0.000013222447,0.000050410406,0.000025785788,0.00006729428,0.0003377263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004540192,0.000009867784,0.00013363916,0.000042153366,0.000017372435,0.0000023326575,0.000009620267,0.965314,0.018371506,0.00007993965,0.015605045,0.00041002792],"study_design_scores_gemma":[0.00015163243,0.000023300825,0.00089714234,0.0000065350687,0.000008867273,1.013201e-7,0.0000020291618,0.92888695,0.068497196,0.00018454986,0.0012386367,0.000103086924],"about_ca_topic_score_codex":0.000033874858,"about_ca_topic_score_gemma":0.000001016992,"teacher_disagreement_score":0.8636876,"about_ca_system_score_codex":0.000058332724,"about_ca_system_score_gemma":0.000012594812,"threshold_uncertainty_score":0.43409008},"labels":[],"label_agreement":null},{"id":"W4389558906","doi":"10.1088/1742-6596/2654/1/012099","title":"Model predictive control for demand response in all-electric school buildings","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; Concordia University","funders":"","keywords":"Flexibility (engineering); Electricity; Model predictive control; Demand response; Peak demand; Thermal comfort; Electricity price; Computer science; Automotive engineering; Environmental science; Environmental economics; Control (management); Engineering; Economics; Electrical engineering; Meteorology","score_opus":0.024026318459120812,"score_gpt":0.24500749419985784,"score_spread":0.22098117574073703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389558906","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3912256,0.000050036604,0.6077468,0.0003315433,0.00023284229,0.00016455472,0.000011107677,0.000078183286,0.0001593382],"genre_scores_gemma":[0.9984742,0.00018714234,0.00093247916,0.000045492707,0.00018650043,0.000036278805,0.0000018938837,0.00002834103,0.00010768314],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990549,0.000036861988,0.00033026043,0.00009953994,0.00020509794,0.0002733222],"domain_scores_gemma":[0.9993737,0.00014995753,0.00010352735,0.00011283484,0.00018039178,0.00007961634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005102729,0.00014518603,0.0002782084,0.00023363918,0.000031494186,0.000056999805,0.00019897708,0.0000481667,0.0000040499785],"category_scores_gemma":[0.00015535291,0.00014126333,0.00008429634,0.0003475394,0.000022572589,0.0005489589,0.000023499151,0.0002013976,0.0000050748836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009678175,0.000014603922,0.0001516903,0.00003592539,0.00013137808,0.00001066065,0.00039510318,0.96177703,0.029199526,0.004491298,0.0019251322,0.0008998464],"study_design_scores_gemma":[0.0012958646,0.00036112295,0.003576634,0.00007751195,0.00005385268,0.000004724825,0.0002513908,0.94805866,0.025007078,0.0205562,0.0005831282,0.00017385013],"about_ca_topic_score_codex":0.0000011510613,"about_ca_topic_score_gemma":0.000002403219,"teacher_disagreement_score":0.6072486,"about_ca_system_score_codex":0.00012291645,"about_ca_system_score_gemma":0.000110844376,"threshold_uncertainty_score":0.5760551},"labels":[],"label_agreement":null},{"id":"W4389600135","doi":"10.48550/arxiv.2312.05073","title":"A Distributed ADMM-based Deep Learning Approach for Thermal Control in Multi-Zone Buildings under Demand Response Events","year":2023,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Demand response; Scalability; Computer science; Renewable energy; Distributed computing; Distributed generation; Power (physics); Electricity; Engineering; Electrical engineering","score_opus":0.05738411943058143,"score_gpt":0.18914438743959985,"score_spread":0.1317602680090184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389600135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37602714,0.000029909243,0.6226181,0.000022415152,0.00021718733,0.0005512732,0.000052423075,0.00045959218,0.000021968535],"genre_scores_gemma":[0.9968123,0.000023748475,0.0020542599,0.00003085853,0.00004979542,0.00003886694,0.00034974847,0.00012252452,0.00051788747],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979806,0.00025041655,0.00028747754,0.0007986113,0.000101456826,0.0005814435],"domain_scores_gemma":[0.9988127,0.00035219654,0.00012066763,0.0005121678,0.00006685751,0.00013541132],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007357477,0.00044231646,0.00047601323,0.0005241116,0.00010608714,0.000039504885,0.00055881386,0.00036086576,0.000011133176],"category_scores_gemma":[0.00010334891,0.0005592872,0.00024262635,0.0005345416,0.00004991801,0.000101205114,0.0003179264,0.00066053605,0.00001661163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083495944,0.000095451316,0.0069509177,0.00023020619,0.00029143557,0.000080933176,0.000056057175,0.99068373,0.00040318328,0.0002894948,0.000052693013,0.000030940417],"study_design_scores_gemma":[0.0043068957,0.00003954318,0.017658148,0.00009837742,0.0001551303,3.5488515e-7,0.0001410456,0.9765726,0.00009115375,0.00010429299,0.00030510686,0.0005274027],"about_ca_topic_score_codex":0.000076941455,"about_ca_topic_score_gemma":0.00007322316,"teacher_disagreement_score":0.6207852,"about_ca_system_score_codex":0.0006888435,"about_ca_system_score_gemma":0.00004877135,"threshold_uncertainty_score":0.9996859},"labels":[],"label_agreement":null},{"id":"W4389778837","doi":"10.1016/j.segan.2023.101255","title":"Intelligent categorization and interactive mechanism for smart demand side management of residential consumers","year":2023,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Categorization; Quarter (Canadian coin); Demand side; Environmental economics; Baseline (sea); Classifier (UML); Duration (music); Peak load; Load profile; Operations management; Reliability engineering; Operations research; Artificial intelligence; Electricity; Economics; Engineering; Automotive engineering; Electrical engineering","score_opus":0.0054193373685215785,"score_gpt":0.20547319163417974,"score_spread":0.20005385426565817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389778837","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04675909,0.0009485174,0.94846714,0.0000819005,0.00093352393,0.0003845606,0.0000035360463,0.00024836577,0.0021733833],"genre_scores_gemma":[0.9897596,0.005659683,0.00028942726,0.00002721432,0.00010330326,0.00017497763,0.00006736368,0.00004557999,0.0038728034],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896926,0.000020443787,0.00025404192,0.0002447583,0.00010811018,0.00040335942],"domain_scores_gemma":[0.9995614,0.0000769929,0.000048736,0.00014800623,0.00008999923,0.00007483095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022240725,0.00018013838,0.00020130449,0.00020698205,0.000113818205,0.000050295002,0.0000798743,0.00007899816,0.0000056674785],"category_scores_gemma":[0.000007946892,0.0001894033,0.0000399338,0.0003229818,0.00004473997,0.0001413173,0.00016734429,0.00006259311,4.3193117e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006677416,0.000011612071,0.00009809186,0.00052716513,0.0003955529,0.000048930848,0.00014394464,0.591317,0.00004513086,0.39389914,0.00326187,0.010184775],"study_design_scores_gemma":[0.0009205474,0.00013493493,0.0009801984,0.00011414211,0.00020635955,0.0000041714225,0.005611622,0.94265765,0.004309118,0.022858443,0.02177607,0.00042676297],"about_ca_topic_score_codex":0.00018193033,"about_ca_topic_score_gemma":0.00006224266,"teacher_disagreement_score":0.9481777,"about_ca_system_score_codex":0.00007019627,"about_ca_system_score_gemma":0.000007002687,"threshold_uncertainty_score":0.77236426},"labels":[],"label_agreement":null},{"id":"W4389977998","doi":"10.18280/psees.060102","title":"Performance Analysis of Multi-Oriented Residential Rooftop PV System in Indonesia Towards Net Zero Emission by 2060","year":2022,"lang":"en","type":"article","venue":"Progress in Solar Energy and Engineering Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Zero emission; Zero-energy building; Net (polyhedron); Zero (linguistics); Environmental science; Architectural engineering; Geography; Engineering; Mathematics; Electrical engineering; Solar energy; Geometry","score_opus":0.005220395784046317,"score_gpt":0.1921009594684934,"score_spread":0.18688056368444708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389977998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9683168,0.01109821,0.018843291,0.0000037084633,0.001211731,0.00016776456,0.000022142762,0.00026372386,0.000072616196],"genre_scores_gemma":[0.99905103,0.00016935528,0.00017352775,0.0000014506983,0.000039423514,0.00037433192,0.00008127263,0.00004945903,0.0000601692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824667,0.00007749771,0.0006161576,0.00030909947,0.00036664034,0.00038394614],"domain_scores_gemma":[0.99949795,0.00002320793,0.00008190556,0.00029608226,0.000023294415,0.00007754563],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005049995,0.00025655402,0.00052859844,0.0009109732,0.000061568855,0.0000320688,0.00022956957,0.00010115251,0.0000031416562],"category_scores_gemma":[0.00000616065,0.0002873312,0.00006613096,0.0015421063,0.000020252692,0.00014379155,0.00016664641,0.00020603529,1.728759e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019024039,0.0000386478,0.08292801,0.00062255806,0.00026563354,0.000025290223,0.00020286834,0.91408604,0.00031900514,0.00022070971,0.000105250234,0.0011669322],"study_design_scores_gemma":[0.00056488294,0.000032901597,0.029883739,0.0001806561,0.00008284671,0.000006688089,0.00015485435,0.9649522,0.0005705156,1.06607935e-7,0.0033060103,0.00026464398],"about_ca_topic_score_codex":0.000334423,"about_ca_topic_score_gemma":0.00001988729,"teacher_disagreement_score":0.05304427,"about_ca_system_score_codex":0.00028361112,"about_ca_system_score_gemma":0.000010934437,"threshold_uncertainty_score":0.99995786},"labels":[],"label_agreement":null},{"id":"W4390075236","doi":"10.1109/lcsys.2023.3345368","title":"Game Theoretical Formulation for Residential Community Microgrid via Mean Field Theory: Proof of Concept","year":2023,"lang":"en","type":"article","venue":"IEEE Control Systems Letters","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Proof of concept; Microgrid; Game theory; Field (mathematics); Mathematical economics; Mathematics; Computer science; Pure mathematics; Artificial intelligence","score_opus":0.009775826077872364,"score_gpt":0.2158748066475795,"score_spread":0.20609898056970713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390075236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29546112,0.00008553756,0.6999039,0.0004934659,0.002429678,0.0010611445,0.00003400438,0.00036080892,0.00017036064],"genre_scores_gemma":[0.998838,0.0000015550227,0.00003190274,0.00029622245,0.00048579084,0.0002393903,0.000035610323,0.00004737478,0.00002416439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864626,0.00027268383,0.00041738705,0.00013342804,0.00020306875,0.0003271477],"domain_scores_gemma":[0.9985961,0.0008141537,0.00008107205,0.00040792118,0.000050597773,0.00005019481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094050984,0.00017364467,0.00033139563,0.00013973299,0.00007618746,0.000040298874,0.00026697753,0.00008945936,0.000008713848],"category_scores_gemma":[0.00005359675,0.00016902799,0.00013376221,0.00014993583,0.00006143698,0.00009741483,0.000023520595,0.00016897132,0.000007961777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015015996,0.000019749874,0.00010442559,0.00049275334,0.00039501564,0.000005119565,0.00091365125,0.86917245,0.08881558,0.020878708,0.018132947,0.0009194397],"study_design_scores_gemma":[0.003748282,0.0002085708,0.00037282653,0.00022030564,0.00019463125,0.000005492307,0.00031104658,0.917517,0.072251394,0.001832203,0.0028813328,0.00045688543],"about_ca_topic_score_codex":0.00007605255,"about_ca_topic_score_gemma":0.000020839852,"teacher_disagreement_score":0.7033769,"about_ca_system_score_codex":0.000066106135,"about_ca_system_score_gemma":0.0000051446227,"threshold_uncertainty_score":0.6892761},"labels":[],"label_agreement":null},{"id":"W4390176003","doi":"10.3390/en17010114","title":"Bayesian Inference-Based Energy Management Strategy for Techno-Economic Optimization of a Hybrid Microgrid","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Rimouski","funders":"","keywords":"Microgrid; Energy management; Inference; Computer science; Bayesian inference; Energy consumption; Bayesian probability; Mathematical optimization; Operations research; Artificial intelligence; Engineering; Control (management); Energy (signal processing); Mathematics","score_opus":0.011189644169557648,"score_gpt":0.21722012832774074,"score_spread":0.2060304841581831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390176003","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050826572,0.00022630613,0.9399483,0.0000946232,0.0008904301,0.00027436158,0.000060743594,0.0017265247,0.0059521017],"genre_scores_gemma":[0.98771745,0.0003815528,0.010765527,0.000020614143,0.00009163914,0.00034588538,0.0002322734,0.00006220592,0.00038282332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912393,0.000008956525,0.0002816967,0.00020791688,0.000096647505,0.00028084475],"domain_scores_gemma":[0.9995371,0.000050112423,0.00004820425,0.00030840168,0.000020935115,0.000035264875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093112,0.00018308521,0.0001903348,0.0004143015,0.00004221856,0.00003637099,0.00022153443,0.000037276684,0.00004871025],"category_scores_gemma":[0.00000435541,0.00020536403,0.00008089128,0.00023755086,0.0000340804,0.000093157316,0.000058356996,0.000031817843,0.000008746453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000078133235,0.000009913992,0.00003053339,0.0001318061,0.00009552009,0.0000046595424,0.0000067326614,0.9767454,0.0003029243,0.010361813,0.004557241,0.0077456143],"study_design_scores_gemma":[0.00039038027,0.000034880337,0.00007973761,0.000030292578,0.000028082146,3.209292e-7,0.00005904279,0.93446034,0.043780223,0.00045997405,0.02047386,0.00020288017],"about_ca_topic_score_codex":0.00005868562,"about_ca_topic_score_gemma":0.000023750892,"teacher_disagreement_score":0.9368909,"about_ca_system_score_codex":0.000090093956,"about_ca_system_score_gemma":0.000016444514,"threshold_uncertainty_score":0.8374502},"labels":[],"label_agreement":null},{"id":"W4390331685","doi":"10.1016/j.energy.2023.130173","title":"Residential demand response program modelling to compliment grid composition and changes in energy efficiency","year":2023,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Electrification; Grid; Renewable energy; Environmental economics; Electricity; Demand response; Variable renewable energy; Stock (firearms); Efficient energy use; Flexibility (engineering); Business; Environmental science; Engineering; Economics; Electric power system; Power (physics); Electrical engineering","score_opus":0.014026214498474448,"score_gpt":0.22764872741534403,"score_spread":0.2136225129168696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390331685","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8876659,0.00046725885,0.108327776,0.0006611249,0.0009209854,0.00016887649,0.000005716914,0.001047092,0.0007352499],"genre_scores_gemma":[0.9979738,0.00031742427,0.00088950136,0.00010202092,0.0002061129,0.00023738915,0.000042753036,0.000041701638,0.00018927843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988873,0.00007248194,0.00019181291,0.00027140498,0.00020811845,0.0003688618],"domain_scores_gemma":[0.9996102,0.00006187526,0.000016813756,0.0001967955,0.000014878317,0.00009945972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026525764,0.00016673892,0.00016253979,0.0005052947,0.00006911511,0.00005735171,0.00012083255,0.000053804037,0.000008561348],"category_scores_gemma":[0.0000040570794,0.00018714885,0.000028301534,0.0005999943,0.000019693889,0.00005782175,0.0001251075,0.00005185173,0.000011037617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008398726,0.000030197692,0.000024996853,0.000016332364,0.00002085116,0.00004102032,0.00016498994,0.98805237,0.0054954914,0.0017054799,0.001665538,0.0026987554],"study_design_scores_gemma":[0.000345119,0.00011439239,0.0016523224,0.000059865004,0.000010431283,0.0000034109592,0.00004341367,0.94890165,0.0118287895,0.00010903716,0.03668828,0.00024326339],"about_ca_topic_score_codex":0.00026242455,"about_ca_topic_score_gemma":0.00045671436,"teacher_disagreement_score":0.1103079,"about_ca_system_score_codex":0.00009682972,"about_ca_system_score_gemma":0.0000057789653,"threshold_uncertainty_score":0.76317084},"labels":[],"label_agreement":null},{"id":"W4390603604","doi":"10.1109/tempr.2024.3350510","title":"Design of Multi-Settlement Electricity Markets Considering Demand Response and Battery Energy Storage Systems Participation","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Settlement (finance); Demand response; Electricity market; Battery storage; Electricity; Computer science; Renewable energy; Battery (electricity); Reliability engineering; Reliability (semiconductor); Operations research; Generator (circuit theory); Economics; Econometrics; Engineering; Power (physics); Electrical engineering","score_opus":0.018614887817782255,"score_gpt":0.23801900171846582,"score_spread":0.21940411390068357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390603604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06002273,0.0009041052,0.9379019,0.000121562996,0.0005569903,0.00013029487,0.000019319057,0.00022354959,0.00011956087],"genre_scores_gemma":[0.9974056,0.0010562805,0.00046122484,0.000036423437,0.00009122739,0.00011683288,0.000007350578,0.00004855371,0.000776502],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984582,0.00037240423,0.0003965524,0.0002958678,0.00020438097,0.00027259043],"domain_scores_gemma":[0.9990879,0.0005251426,0.000048441983,0.00020745263,0.000032480148,0.00009857245],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00058838946,0.00024267379,0.00022316162,0.0006920265,0.00012769373,0.000080779915,0.000049722814,0.0001281701,0.000018586665],"category_scores_gemma":[0.000012455939,0.00024567975,0.000045466804,0.00037254445,0.0000665724,0.00023062663,0.0000031022983,0.00008978215,6.988872e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032489208,0.000037803948,0.000004859372,0.00017112527,0.00018607231,0.0000065666386,0.00012162912,0.9707369,0.0149196675,0.0008883348,0.00024070818,0.012361424],"study_design_scores_gemma":[0.0004173301,0.00006952205,0.0038130681,0.00015668754,0.00008215832,0.000017026498,0.000014497505,0.9648638,0.027403934,0.00007517031,0.002854404,0.00023239624],"about_ca_topic_score_codex":0.00012120777,"about_ca_topic_score_gemma":0.000025259636,"teacher_disagreement_score":0.93744063,"about_ca_system_score_codex":0.00016098858,"about_ca_system_score_gemma":0.000039706807,"threshold_uncertainty_score":0.9999995},"labels":[],"label_agreement":null},{"id":"W4390940400","doi":"10.2139/ssrn.4673749","title":"Distributional forecasting of electricity DART spreads with a covariate-dependent mixture model","year":2024,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université de Montréal; Concordia University","funders":"","keywords":"Covariate; Stylized fact; Dart; Econometrics; Spike (software development); Electricity; Flexibility (engineering); Component (thermodynamics); Statistics; Computer science; Mathematics; Economics; Engineering; Physics","score_opus":0.009643666902049996,"score_gpt":0.19744136334301088,"score_spread":0.1877976964409609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390940400","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13755985,0.0029286211,0.856903,0.00012535424,0.0002838268,0.00010248617,0.000019953466,0.00019928682,0.001877576],"genre_scores_gemma":[0.9980598,0.0006227139,0.00059236365,0.000009589303,0.00025846722,0.000010647979,0.000019724337,0.000051565417,0.0003750961],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99763995,0.000022415665,0.00029537373,0.0001904746,0.00041557525,0.0014361893],"domain_scores_gemma":[0.9996355,0.00003891717,0.000046426063,0.00014329539,0.00006653371,0.00006929582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076507934,0.00020963306,0.00019875076,0.00016834766,0.0000829092,0.00006827998,0.00021610007,0.00007300577,0.000018771336],"category_scores_gemma":[0.00001776672,0.00017394705,0.00009481299,0.00037057363,0.00002467648,0.00020227615,0.00003257491,0.0013848604,0.000006639701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003775037,0.000024823341,0.00015836248,0.000054181888,0.0005477053,0.000021521277,0.000043581647,0.8587903,0.00092297996,0.13644043,0.0004205856,0.002537782],"study_design_scores_gemma":[0.00037513947,0.00017831179,0.00006520233,0.000088598674,0.00012062499,0.0006766706,0.000057351932,0.9566255,0.0017128199,0.039199524,0.0006614797,0.00023876375],"about_ca_topic_score_codex":0.00001793032,"about_ca_topic_score_gemma":0.00018255299,"teacher_disagreement_score":0.8605,"about_ca_system_score_codex":0.0012662633,"about_ca_system_score_gemma":0.00074645446,"threshold_uncertainty_score":0.70933545},"labels":[],"label_agreement":null},{"id":"W4390970819","doi":"10.1109/irec59750.2023.10389446","title":"Co-Simulation Framework OpenDSS-Python to Consider Distribution Grid Constraints in a Transactive Energy System","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Python (programming language); Computer science; Grid; Distribution grid; Probabilistic logic; Smart grid; Demand response; Distributed computing; Electric power system; Electricity; Distributed generation; Renewable energy; Power (physics); Engineering; Operating system; Electrical engineering","score_opus":0.01723010262122564,"score_gpt":0.2662488637525554,"score_spread":0.24901876113132976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390970819","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044163644,0.000011917767,0.9392335,0.00014687545,0.0011514704,0.00029383216,0.00009395431,0.0013631752,0.013541621],"genre_scores_gemma":[0.99893093,0.000007746819,0.00041891902,0.00007099465,0.00011161046,0.00010818352,0.00020319065,0.00003482965,0.00011360694],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887687,0.000043643402,0.00029641413,0.0002467898,0.00020574642,0.0003305234],"domain_scores_gemma":[0.99945414,0.00018551043,0.000018972081,0.0002154153,0.000029565854,0.000096372416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020819825,0.0001744677,0.00020713918,0.0001983735,0.00003964908,0.000042011183,0.000098143246,0.00011564708,0.00014484463],"category_scores_gemma":[0.000034426506,0.00018758893,0.000043581054,0.0007095298,0.000025693884,0.00012719886,0.000015345899,0.00011276312,0.00021625639],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011856579,0.000008726669,0.00017354591,0.000042340587,0.00003877041,0.00004189675,0.00017097371,0.9775946,0.00013972068,0.015938206,0.0029223375,0.0029170378],"study_design_scores_gemma":[0.00069534674,0.000039856717,0.014561899,0.00026809762,0.00002324819,0.0000058957726,0.0014526189,0.9565376,0.008004653,0.00031677022,0.017565995,0.0005280072],"about_ca_topic_score_codex":0.00008707897,"about_ca_topic_score_gemma":0.00009841979,"teacher_disagreement_score":0.9547673,"about_ca_system_score_codex":0.00035758037,"about_ca_system_score_gemma":0.0000122396095,"threshold_uncertainty_score":0.7649654},"labels":[],"label_agreement":null},{"id":"W4391022010","doi":"10.1109/cdc49753.2023.10383868","title":"Learning Optimal Policies in Mean Field Models with Kullback-Leibler Regularization","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Emera (Canada)","funders":"Agence Nationale de la Recherche; National Science Foundation","keywords":"Regularization (linguistics); Kullback–Leibler divergence; Computer science; Field (mathematics); Artificial intelligence; Machine learning; Mathematics","score_opus":0.011587748675967242,"score_gpt":0.19683045395614193,"score_spread":0.1852427052801747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391022010","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5972872,0.000016222119,0.2654978,0.00050025963,0.00018217243,0.00014774341,3.421627e-7,0.0017959888,0.13457228],"genre_scores_gemma":[0.9895202,0.000046590034,0.0029596398,0.00006623898,0.000053803094,0.000023584373,0.000015199638,0.000035254867,0.0072794734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994197,0.000007981564,0.00010968771,0.00011505472,0.00012874599,0.000218851],"domain_scores_gemma":[0.99979776,0.000024838157,0.000008581678,0.00013010361,0.000011887725,0.000026803777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009132213,0.00009503269,0.00008688144,0.0002302238,0.000027529895,0.000031394153,0.00007764276,0.00004134377,0.000056528028],"category_scores_gemma":[0.0000065945587,0.000087042856,0.000014570634,0.00055760384,0.000007476095,0.00016935456,0.000044178938,0.00009967421,0.000046368426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035699325,0.000002820449,0.000841783,0.000015134582,0.000015155072,0.0000057130924,0.00054084515,0.9882921,0.00015687119,0.007729259,0.0019038242,0.0004929488],"study_design_scores_gemma":[0.00017618258,0.00003359145,0.0017518672,0.00001972009,0.0000039764896,7.3990043e-7,0.00045713678,0.9939802,0.0019685747,0.00019723325,0.0012822554,0.0001284953],"about_ca_topic_score_codex":0.00011393385,"about_ca_topic_score_gemma":0.00019606212,"teacher_disagreement_score":0.39223304,"about_ca_system_score_codex":0.00003485422,"about_ca_system_score_gemma":0.000004007285,"threshold_uncertainty_score":0.35495046},"labels":[],"label_agreement":null},{"id":"W4391099498","doi":"10.3390/su16020891","title":"Enhancing Renewable Energy Use in Residential Communities: Analyzing Storage, Trading, and Combinations","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Incheon National University","keywords":"Renewable energy; Environmental economics; Consumption (sociology); Energy storage; Grid; Renewable resource; Battery storage; Photovoltaic system; Environmental science; Computer science; Business; Battery (electricity); Power (physics); Engineering; Economics; Mathematics; Electrical engineering","score_opus":0.009138403949320322,"score_gpt":0.22901366127802802,"score_spread":0.2198752573287077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391099498","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9579297,0.0009741514,0.038575567,0.00018532136,0.00050097273,0.00016277703,0.000005367249,0.0005216084,0.0011445832],"genre_scores_gemma":[0.9988289,0.000078585974,0.00014642424,0.000012481298,0.00004467706,0.000054677614,0.000017975486,0.000031389787,0.0007848999],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899757,0.000112762296,0.00027139203,0.00018982739,0.00012120551,0.00030726963],"domain_scores_gemma":[0.9992483,0.0002621705,0.0000117314785,0.00034910886,0.00007134191,0.000057330093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050828466,0.00014884482,0.00016693187,0.0003923122,0.00010367058,0.0002450513,0.00012145544,0.000060899652,0.000047413454],"category_scores_gemma":[0.00013055721,0.00017438168,0.000041799383,0.0005209225,0.00007011784,0.000527589,0.000103206694,0.00018219522,6.0610614e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011151187,0.000093117815,0.018683,0.0016254382,0.00012248896,0.00013994405,0.0054433164,0.9392463,0.00016868612,0.0272961,0.0057410784,0.0014293899],"study_design_scores_gemma":[0.00055407785,0.000052303058,0.037619453,0.00022914157,0.00006239563,0.000006465184,0.0076126307,0.88164717,0.0012810678,0.030536039,0.039804317,0.0005949609],"about_ca_topic_score_codex":0.020225618,"about_ca_topic_score_gemma":0.041851692,"teacher_disagreement_score":0.057599142,"about_ca_system_score_codex":0.001111732,"about_ca_system_score_gemma":0.00006581711,"threshold_uncertainty_score":0.9862988},"labels":[],"label_agreement":null},{"id":"W4391127873","doi":"10.61091/jcmcc117-09","title":"Quantitative Analysis of Distribution and Reliability Based on Maximum Capacity Segmented Subscribers on Distribution Lines","year":2023,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Reliability (semiconductor); Mathematics; Statistics; Econometrics; Reliability engineering; Engineering; Mathematical analysis","score_opus":0.016006135177180178,"score_gpt":0.24180022739095022,"score_spread":0.22579409221377006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391127873","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9707013,0.000017278104,0.024235938,0.00006923285,0.0045813513,0.0001633984,0.00005819834,0.00008313534,0.00009017558],"genre_scores_gemma":[0.99906814,0.000029604133,0.0006104952,0.0000054853535,0.00018477264,0.000002270362,0.00007745991,0.000020967362,7.931612e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979586,0.000108511034,0.00088491105,0.00019039169,0.00060936494,0.00024824028],"domain_scores_gemma":[0.9979433,0.0008846598,0.00047330046,0.00023112279,0.0003479062,0.00011971023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015210119,0.0002540976,0.0007367053,0.00033723898,0.00013434819,0.00006993073,0.00016009479,0.00011769008,0.0000023732973],"category_scores_gemma":[0.0005232717,0.00023415442,0.00019391757,0.001249512,0.00008849813,0.00009736889,0.0000677879,0.00029679097,9.3270955e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004303458,0.00079894275,0.0017741459,0.00069026044,0.0011764576,0.00001721882,0.000623387,0.5850439,0.0006268777,0.40713376,0.0011265338,0.0005581662],"study_design_scores_gemma":[0.0021643178,0.0009894016,0.005621861,0.0002545412,0.0006058102,0.0000014380696,0.00021646249,0.9454561,0.0014154883,0.04287249,0.00015257632,0.00024952093],"about_ca_topic_score_codex":0.0000102103995,"about_ca_topic_score_gemma":5.4445576e-7,"teacher_disagreement_score":0.36426127,"about_ca_system_score_codex":0.00018375751,"about_ca_system_score_gemma":0.000021286563,"threshold_uncertainty_score":0.954854},"labels":[],"label_agreement":null},{"id":"W4391170553","doi":"10.1049/smc2.12075","title":"An artificial intelligence‐based non‐intrusive load monitoring of energy consumption in an electrical energy system using a modified K‐Nearest Neighbour algorithm","year":2024,"lang":"en","type":"article","venue":"IET Smart Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"FP7 International Cooperation; International Development Research Centre","keywords":"Computer science; Energy (signal processing); Work (physics); Energy consumption; Machine learning; Artificial intelligence; Algorithm; Engineering","score_opus":0.03552666793284705,"score_gpt":0.26908638205150426,"score_spread":0.23355971411865722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391170553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51561236,0.0005621916,0.48075694,0.0000058661926,0.002145213,0.00008846815,0.000021448732,0.00047227717,0.00033521155],"genre_scores_gemma":[0.9959354,0.00006371149,0.0030024652,0.000009369845,0.0007863773,0.00007315462,0.000034214903,0.00008233795,0.00001295849],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979775,0.00010186605,0.0006014843,0.00040537847,0.0004298424,0.00048394292],"domain_scores_gemma":[0.9992712,0.00010157521,0.000051837404,0.00036446945,0.000085503474,0.00012537227],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023732691,0.00032218313,0.0003819183,0.00061050715,0.00007173597,0.00018868873,0.00024518406,0.00017363702,0.000026220632],"category_scores_gemma":[0.000008041897,0.00036250261,0.00009383783,0.00053357525,0.00007828762,0.00040049388,0.00003901093,0.00018911874,0.000005383126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004489366,0.00005930425,0.00090069894,0.000280576,0.00007882114,0.00012431112,0.00044773315,0.9544783,0.005700451,0.012425605,0.000018955701,0.025440304],"study_design_scores_gemma":[0.00009050428,0.000102871156,0.0005334349,0.00033491434,0.000039433835,0.0000076008955,0.0007042175,0.93466735,0.062845185,0.00024883973,0.00009535486,0.00033029704],"about_ca_topic_score_codex":0.0014364872,"about_ca_topic_score_gemma":0.00028094754,"teacher_disagreement_score":0.48032302,"about_ca_system_score_codex":0.0006664939,"about_ca_system_score_gemma":0.00009649282,"threshold_uncertainty_score":0.9998827},"labels":[],"label_agreement":null},{"id":"W4391176683","doi":"10.2139/ssrn.4704408","title":"Optimizing Cogenerated Systems: A Dual Perspective on Thermodynamics and Economics with Integrated Desalination","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Dual (grammatical number); Perspective (graphical); Desalination; Dual purpose; Thermodynamics; Economics; Environmental science; Mathematical economics; Computer science; Engineering; Physics; Chemistry; Mechanical engineering; Philosophy; Artificial intelligence","score_opus":0.005742903468413458,"score_gpt":0.1982760119715525,"score_spread":0.19253310850313904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391176683","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89824164,0.016620183,0.07363382,0.00032798815,0.0024899358,0.00061323436,0.000039536673,0.00060469616,0.0074289804],"genre_scores_gemma":[0.98843735,0.010254758,0.0003021273,0.000013392026,0.0004569396,0.000047873185,0.00004765392,0.00016365724,0.00027621692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99793714,0.000069690206,0.00032986474,0.00039870187,0.00015750143,0.0011070953],"domain_scores_gemma":[0.9994108,0.00002865919,0.00011827639,0.00022011147,0.00014725109,0.00007487447],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00068893464,0.00044524853,0.00035853192,0.00041379602,0.000090990914,0.00041239892,0.00017617941,0.00022600421,0.000002271406],"category_scores_gemma":[0.0000111114905,0.00038291627,0.000073539944,0.00015433303,0.00003709829,0.0000733781,0.00013826034,0.0037960273,0.000007432337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003898466,0.00001130143,0.0000038373946,0.000053031312,0.0012558532,0.000014385288,0.00022916049,0.74803746,0.00002988746,0.24959949,0.000020058897,0.0007065472],"study_design_scores_gemma":[0.0004468488,0.00023136298,0.000012075784,0.00039434998,0.00024672176,0.00033615128,0.004493265,0.9600972,0.000047691137,0.033019714,0.00019472453,0.00047991527],"about_ca_topic_score_codex":0.00016302904,"about_ca_topic_score_gemma":0.0009632651,"teacher_disagreement_score":0.21657977,"about_ca_system_score_codex":0.0083309775,"about_ca_system_score_gemma":0.0011861764,"threshold_uncertainty_score":0.99986225},"labels":[],"label_agreement":null},{"id":"W4391214730","doi":"10.2139/ssrn.4706893","title":"Deep Reinforcement Learning for Economic Battery Dispatch: A Comprehensive Comparison of Algorithms and Experiment Design Choices","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Hyperparameter; Computer science; Battery (electricity); Benchmark (surveying); Economic dispatch; Artificial intelligence; Machine learning; Power (physics); Electric power system","score_opus":0.022419806225838015,"score_gpt":0.2689997521670136,"score_spread":0.2465799459411756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391214730","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043074317,0.036324684,0.91742533,0.00009310347,0.0020328064,0.00068979297,0.0000020340337,0.0001441029,0.00021382039],"genre_scores_gemma":[0.9870618,0.008959136,0.0027238687,0.000012056096,0.00065288553,0.00020495112,0.00003243244,0.00012174034,0.00023110339],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99722344,0.00006185272,0.00073929183,0.0003684155,0.00020740664,0.0013996168],"domain_scores_gemma":[0.9992438,0.0001314673,0.00025772373,0.00023354546,0.000041178995,0.00009229726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005937787,0.00044071753,0.00065039156,0.00028798392,0.000104593084,0.00014115465,0.00031202385,0.00016483416,0.000019537983],"category_scores_gemma":[0.000006791492,0.00045195365,0.00020711723,0.000038863578,0.00004377649,0.00007029898,0.00042903473,0.0022588929,0.000009916059],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036289337,0.000015277174,0.000083234685,0.0003828079,0.0014299373,0.0000014433244,0.0005741796,0.9873437,0.00021303757,0.0025037457,0.000252175,0.0071641477],"study_design_scores_gemma":[0.0005740293,0.00037525696,0.00004309142,0.00022285292,0.00024082467,0.000023728915,0.0016255985,0.98194104,0.0017850889,0.010566569,0.0021682698,0.00043366553],"about_ca_topic_score_codex":0.00006177648,"about_ca_topic_score_gemma":0.00008562861,"teacher_disagreement_score":0.9439875,"about_ca_system_score_codex":0.0019188166,"about_ca_system_score_gemma":0.00033613594,"threshold_uncertainty_score":0.99979323},"labels":[],"label_agreement":null},{"id":"W4391260617","doi":"10.30574/ijsra.2024.11.1.0080","title":"Software tools in energy management: utilization and impact in Canada, USA, and Africa","year":2024,"lang":"en","type":"article","venue":"International Journal of Science and Research Archive","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Software; Environmental resource management; Business; Environmental planning; Engineering; Geography; Computer science; Environmental science; Operating system","score_opus":0.04199695000510122,"score_gpt":0.3212593614896599,"score_spread":0.27926241148455866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391260617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9906533,0.0026054983,0.002440288,0.00043579243,0.00038406154,0.00006131067,0.000012451572,0.000005239469,0.0034020618],"genre_scores_gemma":[0.99447966,0.0049809227,0.00044190447,0.000012304021,0.000040529867,0.0000027454428,7.4933286e-7,0.0000041091494,0.000037068316],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99876726,0.000024391533,0.00015224052,0.00011204587,0.00075330294,0.0001907832],"domain_scores_gemma":[0.9996227,0.00015051088,0.000011464484,0.000035976005,0.00009099199,0.00008834884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082329795,0.00005098935,0.00006250051,0.0011667399,0.000034785095,0.0002006634,0.0002082318,0.0000080381915,0.000009822063],"category_scores_gemma":[0.00009137361,0.000040794203,0.000007872984,0.00043880986,0.0002069728,0.00047165022,0.00016078175,0.00015171764,3.2872288e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009494856,0.000037442896,0.045601565,0.00015215152,0.00018227177,0.0028836392,0.0029610845,0.09358446,0.0028928209,0.020360181,0.0067287246,0.8245207],"study_design_scores_gemma":[0.0004690554,0.00008521251,0.68770325,0.0005902412,0.000003894062,0.00013088169,0.0010107683,0.28049976,0.00035687463,0.008749339,0.020260544,0.0001401402],"about_ca_topic_score_codex":0.0274966,"about_ca_topic_score_gemma":0.09314992,"teacher_disagreement_score":0.8243806,"about_ca_system_score_codex":0.00040829892,"about_ca_system_score_gemma":0.00025611458,"threshold_uncertainty_score":0.9789794},"labels":[],"label_agreement":null},{"id":"W4391342823","doi":"10.1109/isgteurope56780.2023.10408104","title":"Contribution of Conventional Demand Response Resources to Peak Shaving of Power Substations","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Hydro-Québec","keywords":"Peaking power plant; Demand response; Peak demand; Flexibility (engineering); Reliability engineering; Reliability (semiconductor); Asset (computer security); Investment (military); Grid; Load Shedding; Power (physics); Load management; Computer science; Resource (disambiguation); Electric power system; Environmental economics; Electricity; Engineering; Electrical engineering; Economics; Computer security","score_opus":0.008360881852293424,"score_gpt":0.2262570875403289,"score_spread":0.21789620568803547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391342823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98063487,0.000023369872,0.016862785,0.00018807792,0.00016268891,0.00009258618,0.000015791738,0.0001645053,0.0018553027],"genre_scores_gemma":[0.9989108,0.0000043217246,0.00032718654,0.000012898791,0.000011967256,0.000014493344,0.000020116826,0.000010024518,0.000688204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994219,0.000029391642,0.00020668944,0.000073522504,0.00015526937,0.00011324308],"domain_scores_gemma":[0.9995989,0.00015055598,0.000021927623,0.000117432755,0.000077908066,0.000033251345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040122695,0.000054580625,0.000093899616,0.00022392593,0.00002088996,0.000005647584,0.00006826171,0.000022334603,0.00021138309],"category_scores_gemma":[0.00013857098,0.00005728554,0.0000378825,0.00039131465,0.000016141727,0.000044817796,0.000034020894,0.000024453133,0.00004323552],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013907775,0.000022064967,0.004313916,0.000036391335,0.00009820332,0.0000038371336,0.00066774705,0.89417326,0.068457544,0.014845239,0.017179832,0.00006288414],"study_design_scores_gemma":[0.0005030338,0.00006417754,0.92799556,0.00005324726,0.000019928426,7.191768e-7,0.0004986848,0.029731615,0.02239997,0.00020494615,0.01839819,0.00012990579],"about_ca_topic_score_codex":0.000011137488,"about_ca_topic_score_gemma":0.000022569131,"teacher_disagreement_score":0.9236817,"about_ca_system_score_codex":0.00002823106,"about_ca_system_score_gemma":0.000005023781,"threshold_uncertainty_score":0.23360364},"labels":[],"label_agreement":null},{"id":"W4391351336","doi":"10.30574/ijsra.2024.11.1.0113","title":"Energy efficiency through variable frequency drives: industrial applications in Canada, USA, and Africa","year":2024,"lang":"en","type":"article","venue":"International Journal of Science and Research Archive","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variable (mathematics); Variable-frequency drive; Energy (signal processing); Efficient energy use; Environmental science; Engineering; Electrical engineering; Mathematics; Physics; Statistics","score_opus":0.028895883789755435,"score_gpt":0.2853896722392673,"score_spread":0.2564937884495119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391351336","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7446198,0.007733046,0.11957791,0.0035362758,0.0047712326,0.0004392397,0.0001007515,0.000043701486,0.11917806],"genre_scores_gemma":[0.99713033,0.0010963222,0.0014442347,0.000016245118,0.00024040273,0.000010702478,9.0425664e-7,0.0000053543663,0.000055519595],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99827933,0.00002958611,0.00021191538,0.00014491461,0.00108698,0.00024726102],"domain_scores_gemma":[0.99932194,0.000275348,0.000019196628,0.00006357878,0.00021361685,0.00010632003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008638936,0.00006153307,0.0000775131,0.00062476925,0.000095933545,0.00016691658,0.00048010552,0.00001539054,0.000021283797],"category_scores_gemma":[0.000107795815,0.000049084458,0.000011387714,0.0007401656,0.00045404682,0.00041618696,0.00014715578,0.00030712204,0.0000010878774],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056045763,0.00016490776,0.012778684,0.00010603098,0.0003666286,0.00094867876,0.00895878,0.094108514,0.06592721,0.69657624,0.033177268,0.086831],"study_design_scores_gemma":[0.00139211,0.0003510988,0.01904436,0.001041331,0.000023579336,0.00032059028,0.006513846,0.30907914,0.0054470478,0.1707997,0.48538363,0.0006035897],"about_ca_topic_score_codex":0.08307227,"about_ca_topic_score_gemma":0.03923947,"teacher_disagreement_score":0.52577657,"about_ca_system_score_codex":0.0004670114,"about_ca_system_score_gemma":0.0013817471,"threshold_uncertainty_score":0.9782919},"labels":[],"label_agreement":null},{"id":"W4391422956","doi":"10.1109/ias54024.2023.10406423","title":"A Model-Free Multi-Agent Reinforcement Learning Approach to Reach a Robust, Optimal, and Environment-Friendly Power Management in a Micro-Grid","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Photovoltaic system; Computer science; Artificial neural network; Renewable energy; Turbine; Grid; Hyperparameter; Wind power; Hyperparameter optimization; Environmentally friendly; Artificial intelligence; Engineering; Electrical engineering; Support vector machine","score_opus":0.020634060037473825,"score_gpt":0.19998211566988017,"score_spread":0.17934805563240636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391422956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11026801,0.0001208311,0.8241438,0.00021341137,0.00024395375,0.0013429679,0.0000042925967,0.0010853596,0.06257737],"genre_scores_gemma":[0.5299498,0.001205525,0.44152215,0.00027266977,0.0000733091,0.0014731936,0.00011715162,0.00023670943,0.02514952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978731,0.000027077243,0.00042194792,0.00058835204,0.0003696695,0.0007198218],"domain_scores_gemma":[0.9990878,0.000013946374,0.000028583865,0.00067500776,0.0000074759428,0.00018719646],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004126255,0.0003631859,0.00026807003,0.0005862392,0.000078409576,0.00007637423,0.0003895464,0.00007581213,0.000055762062],"category_scores_gemma":[0.0000102950735,0.00038353915,0.000060294322,0.00046683752,0.000025630728,0.00014908114,0.0010461009,0.00022369786,0.00018247134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014550839,0.00005970738,0.000097503034,0.00008962617,0.000118559474,0.00003107508,0.00073777675,0.9825763,0.0004443106,0.00074459816,0.014549658,0.00053633],"study_design_scores_gemma":[0.0011924971,0.000054652748,0.0010752769,0.000026001111,0.000025361864,0.0000025613206,0.0009206429,0.9740032,0.00014466803,0.0000081157605,0.022114763,0.00043223938],"about_ca_topic_score_codex":0.000036561294,"about_ca_topic_score_gemma":0.000008704943,"teacher_disagreement_score":0.41968176,"about_ca_system_score_codex":0.0003125157,"about_ca_system_score_gemma":0.000004068236,"threshold_uncertainty_score":0.99986166},"labels":[],"label_agreement":null},{"id":"W4391425506","doi":"10.1016/j.segan.2024.101294","title":"Evaluation of regression models and Bayes-Ensemble Regressor technique for non-intrusive load monitoring","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Agence Nationale de la Recherche","keywords":"Regression; Regression analysis; Computer science; Ensemble learning; Naive Bayes classifier; Predictive modelling; Bayesian probability; Machine learning; Energy consumption; Data mining; Bayes' theorem; Engineering; Artificial intelligence; Statistics; Support vector machine; Mathematics","score_opus":0.011915652650549042,"score_gpt":0.25063980687804643,"score_spread":0.2387241542274974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391425506","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024166094,0.029442715,0.9399918,0.000052853753,0.0009880943,0.0006327373,0.0000026567122,0.00023218484,0.004490908],"genre_scores_gemma":[0.99302787,0.0036654002,0.0012194881,0.0000059014073,0.0005496719,0.0006382596,0.000009442149,0.000062758096,0.00082118396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868,0.000036077203,0.00024288484,0.00031375443,0.0003296282,0.00039764048],"domain_scores_gemma":[0.9992243,0.00009779753,0.00003628532,0.00021705327,0.00034962845,0.00007491879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011544682,0.00022310576,0.00023631442,0.00016795794,0.00011190751,0.0000799341,0.00008348308,0.00016354451,0.0000025167597],"category_scores_gemma":[0.000029453015,0.00019924277,0.000051684285,0.000268514,0.000039711285,0.00030121816,0.00010846984,0.00012216237,5.843451e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024412186,0.000007391076,0.000015166124,0.00046224575,0.000106592,0.000013323414,0.00010628322,0.93672836,0.0007047177,0.014074489,0.0022905492,0.045466445],"study_design_scores_gemma":[0.00033470368,0.0000705659,0.000032501914,0.00046763694,0.00015394593,0.0000050229246,0.0003446157,0.9663262,0.011332448,0.01666226,0.0040537906,0.00021632326],"about_ca_topic_score_codex":0.00010784754,"about_ca_topic_score_gemma":0.0000109418625,"teacher_disagreement_score":0.9688618,"about_ca_system_score_codex":0.00027192556,"about_ca_system_score_gemma":0.00006396329,"threshold_uncertainty_score":0.81248844},"labels":[],"label_agreement":null},{"id":"W4391468282","doi":"10.1109/etfg55873.2023.10407492","title":"Optimum Cost and Eco-Friendly Power Management in a Micro-Grid, Based on Multi-Agent Reinforcement Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Renewable energy; Computer science; Grid; Hyperparameter; Turbine; Wind power; Environmentally friendly; Reliability engineering; Control engineering; Automotive engineering; Artificial intelligence; Engineering; Electrical engineering","score_opus":0.011098612881159214,"score_gpt":0.21990456877202,"score_spread":0.2088059558908608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391468282","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.344334,0.00015600496,0.19696037,0.0010303375,0.0042100837,0.0037409395,0.000010105827,0.004978505,0.44457963],"genre_scores_gemma":[0.9839462,0.0002232512,0.0056715556,0.0003489216,0.00004330578,0.00030450427,0.00006421682,0.000084575026,0.009313462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985845,0.000024745541,0.00029782954,0.00033347728,0.00024757462,0.0005118427],"domain_scores_gemma":[0.999514,0.00004127957,0.00002363189,0.0003067326,0.000011301637,0.000103084945],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031305087,0.00025374594,0.00018299652,0.0005361484,0.000063138745,0.00006319784,0.00012488481,0.00005326111,0.00030317283],"category_scores_gemma":[0.000010617528,0.0002588032,0.000046604375,0.00046146498,0.00001859675,0.000080523576,0.00016638164,0.00017906909,0.00042296655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000141777355,0.000027649046,0.0006424557,0.00006629838,0.000053504522,0.00009233202,0.00009080597,0.98869985,0.00014571486,0.0003234382,0.00823059,0.0016131799],"study_design_scores_gemma":[0.0015002334,0.00007503596,0.01120459,0.000055589626,0.000012102435,6.7525406e-7,0.00035023916,0.8615027,0.00055476994,0.0000016256596,0.12444453,0.0002979269],"about_ca_topic_score_codex":0.000023607428,"about_ca_topic_score_gemma":0.00002636622,"teacher_disagreement_score":0.6396122,"about_ca_system_score_codex":0.00023221571,"about_ca_system_score_gemma":0.0000043229256,"threshold_uncertainty_score":0.9999864},"labels":[],"label_agreement":null},{"id":"W4391495579","doi":"10.1109/etfg55873.2023.10407462","title":"Stochastic Physics-Informed Deep Generative Network Scenario Generation: Application on Responsive Residential Load Management","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Generative grammar; Computer science; Artificial intelligence","score_opus":0.015920304563067297,"score_gpt":0.23333715880854258,"score_spread":0.2174168542454753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391495579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009670938,0.000056155546,0.9546435,0.00035587628,0.0018053501,0.000938535,0.0000032998228,0.0015776136,0.030948743],"genre_scores_gemma":[0.9684925,0.00026864104,0.010400444,0.00096477394,0.0065657683,0.0016631238,0.00051176286,0.00017720836,0.01095578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839115,0.000032618827,0.0002994603,0.0003470108,0.00048819848,0.00044156285],"domain_scores_gemma":[0.999236,0.00006535252,0.000043027965,0.00050156476,0.00007148824,0.00008255987],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00021080021,0.00025507653,0.00017260178,0.00013689733,0.0001967529,0.00009661501,0.0002043442,0.00006547927,0.00007432638],"category_scores_gemma":[0.0000146549555,0.00026447515,0.000066939974,0.000793851,0.000026770525,0.00015986378,0.0001187345,0.00011894474,0.0015824813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024889485,0.000009450226,0.0000047968624,0.00001997924,0.00013556512,0.000010031397,0.00015692854,0.8588677,0.0002137093,0.02552384,0.108494595,0.0065385257],"study_design_scores_gemma":[0.00048153402,0.000042480307,0.0010972106,0.000019593239,0.000043729346,7.4966965e-7,0.00010574338,0.9815528,0.0011555842,0.0008832089,0.014289152,0.0003282632],"about_ca_topic_score_codex":0.000016442536,"about_ca_topic_score_gemma":0.00031146893,"teacher_disagreement_score":0.95882154,"about_ca_system_score_codex":0.0004889326,"about_ca_system_score_gemma":0.000027222959,"threshold_uncertainty_score":0.99998075},"labels":[],"label_agreement":null},{"id":"W4391495584","doi":"10.1109/etfg55873.2023.10408549","title":"Load Demand Forecasting in Smart Microgrid Using NWP via Feature Engineering","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Microgrid; Feature engineering; Computer science; Feature (linguistics); Demand forecasting; Meteorology; Engineering; Operations research; Artificial intelligence; Deep learning","score_opus":0.016510820527891688,"score_gpt":0.19549638843107503,"score_spread":0.17898556790318335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391495584","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95404136,0.00040242108,0.038287267,0.00007946416,0.0015325041,0.00020060704,0.0000018586109,0.0017174248,0.0037370746],"genre_scores_gemma":[0.9884538,0.000054551405,0.010559844,0.000039915074,0.00029941043,0.000025780982,0.000013675365,0.00010418895,0.00044882795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989113,0.000007711158,0.00019857335,0.00020884795,0.00017332623,0.0005002132],"domain_scores_gemma":[0.9996564,0.000045344328,0.000013873842,0.00020244566,0.000017185943,0.00006477001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002475585,0.00020612346,0.00017992532,0.00030205445,0.00003468994,0.000045616183,0.00013669927,0.00008793716,0.000028991257],"category_scores_gemma":[0.00002658343,0.00022276974,0.000052264815,0.0008395714,0.0000075193448,0.00014248684,0.000103593375,0.00018724138,0.00006347407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015380567,0.0000037291454,0.002904713,0.00008682319,0.00003179203,0.00007125399,0.000080594735,0.980464,0.012154544,0.000030369918,0.0026703398,0.001500301],"study_design_scores_gemma":[0.00023966083,0.0000053444364,0.0049610944,0.00006827814,0.000009529202,0.0000150188525,0.000033694425,0.9777833,0.0044950806,0.000013297455,0.012122011,0.00025368534],"about_ca_topic_score_codex":0.00007843061,"about_ca_topic_score_gemma":0.00014796159,"teacher_disagreement_score":0.03441243,"about_ca_system_score_codex":0.00024295457,"about_ca_system_score_gemma":0.000008580151,"threshold_uncertainty_score":0.90842867},"labels":[],"label_agreement":null},{"id":"W4391508096","doi":"10.1007/978-981-99-9785-5_30","title":"Multi-agent Reinforcement Learning Based User-Centric Demand Response with Non-intrusive Load Monitoring","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Computer science; Reinforcement learning; Demand response; On demand; Reinforcement; Human–computer interaction; Artificial intelligence; Real-time computing; Multimedia; Electrical engineering","score_opus":0.009654344786332087,"score_gpt":0.21503461895704865,"score_spread":0.20538027417071655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391508096","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019780463,0.00055607286,0.9928346,0.00007693624,0.0028954318,0.00043571237,0.0000012104089,0.00036978928,0.0008521847],"genre_scores_gemma":[0.91271126,0.00010643114,0.083570816,0.00014107571,0.00076789444,0.00004694767,0.0000063814236,0.00017054973,0.0024786594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969876,0.000020727844,0.00040764175,0.00090200413,0.0010093885,0.00067267707],"domain_scores_gemma":[0.9986793,0.00027961735,0.00009299643,0.0006561108,0.00013046314,0.00016153773],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007342205,0.0006110244,0.00040693316,0.0009095191,0.00016247232,0.00032538807,0.000729298,0.00019168574,0.000029340494],"category_scores_gemma":[0.00005182568,0.0005452519,0.000092383445,0.00055679004,0.00018848824,0.0001712436,0.00043170803,0.00092673,0.00008602825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006542782,0.0000064459846,0.00012440019,0.00014080106,0.000048758644,0.00031346624,0.0003510024,0.9920452,0.00026411103,0.000029577195,0.00001620945,0.0065945615],"study_design_scores_gemma":[0.0005173835,0.00016783465,0.00039620296,0.0012668152,0.00004240857,0.00001097684,8.7493015e-7,0.98634505,0.0037943227,0.000063794425,0.0067560873,0.0006382511],"about_ca_topic_score_codex":0.00001458223,"about_ca_topic_score_gemma":0.000020360836,"teacher_disagreement_score":0.9107332,"about_ca_system_score_codex":0.0016257473,"about_ca_system_score_gemma":0.00023669495,"threshold_uncertainty_score":0.9996999},"labels":[],"label_agreement":null},{"id":"W4391707732","doi":"10.1016/j.apenergy.2024.122770","title":"Exergy-driven optimal operation of virtual energy station based on coordinated cooperative and Stackelberg games","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Chinese Society for Electrical Engineering; Jiangsu Association for Science and Technology; Southeast University; National Natural Science Foundation of China; Canada School of Energy and Environment","keywords":"Stackelberg competition; Computer science; Scheduling (production processes); Demand response; Mathematical optimization; Game theory; Electricity; Operations research; Economics; Microeconomics; Engineering; Mathematics","score_opus":0.004993320735950774,"score_gpt":0.19219647367417914,"score_spread":0.18720315293822837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391707732","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07848274,0.00034032986,0.89337033,0.00011988317,0.0007842029,0.00015375005,0.00005874038,0.00079202297,0.025897987],"genre_scores_gemma":[0.9977284,0.00016899823,0.00092690956,0.00011870617,0.00010749366,0.000136977,0.00032470483,0.00007192349,0.00041586297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890554,0.000030192652,0.00028640448,0.0003329342,0.00022110688,0.00022381493],"domain_scores_gemma":[0.9995429,0.00010437595,0.000026237396,0.00021154746,0.000043169443,0.00007176164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000077062716,0.00025626278,0.00023174254,0.00026638797,0.000051783656,0.00008294122,0.00010215189,0.000098922115,0.00008686603],"category_scores_gemma":[0.000005389151,0.0002560913,0.000035854115,0.00032269754,0.00005978179,0.00013213186,0.000040250485,0.000086224674,0.0000074211257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003181797,0.000024302328,0.0000017104671,0.000027456139,0.000078383455,0.0000056844115,0.000102192826,0.7387164,0.008559318,0.24111474,0.0024880636,0.008849903],"study_design_scores_gemma":[0.00042780465,0.0001679332,0.000042090065,0.000042149193,0.000028762763,6.277923e-7,0.00010940407,0.90182585,0.0729345,0.00008096416,0.024088372,0.00025154813],"about_ca_topic_score_codex":0.000115148774,"about_ca_topic_score_gemma":0.00008595974,"teacher_disagreement_score":0.91924566,"about_ca_system_score_codex":0.00010481361,"about_ca_system_score_gemma":0.000032603035,"threshold_uncertainty_score":0.99998915},"labels":[],"label_agreement":null},{"id":"W4391896204","doi":"10.1016/j.segan.2024.101324","title":"Distributed stochastic energy coordination for residential prosumers: Framework and implementation","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Computer science; Distributed generation; Distributed computing; Environmental economics; Renewable energy; Economics; Engineering; Electrical engineering","score_opus":0.0032639367734747515,"score_gpt":0.22122579579892346,"score_spread":0.2179618590254487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391896204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041784164,0.0068167527,0.9872862,0.00022087457,0.00085344294,0.00018275918,0.000014338047,0.00033597427,0.00011120689],"genre_scores_gemma":[0.99639976,0.00068273954,0.00033909842,0.000046380654,0.00083601405,0.00040588513,0.00036689677,0.00006214267,0.00086108403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880654,0.000019295194,0.00023343586,0.0003202926,0.00012075655,0.0004996862],"domain_scores_gemma":[0.99954605,0.00013445843,0.000024324063,0.00013400796,0.000067263245,0.00009392402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018731727,0.0002166373,0.0001691387,0.00016522947,0.0001923407,0.0003176334,0.00006927735,0.00013389498,0.000017994513],"category_scores_gemma":[0.00001610829,0.0002240249,0.000042905573,0.00034682354,0.000042681826,0.00029307103,0.00008260545,0.00010025977,1.7409391e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000244461,0.0000064409223,0.00002318937,0.0002285815,0.00013608356,0.000018217866,0.00006571369,0.5526991,0.00001343313,0.4011653,0.02084375,0.02477573],"study_design_scores_gemma":[0.0003769053,0.00009812917,0.00021760099,0.00007892107,0.00010514976,0.0000056252034,0.0008458275,0.869739,0.0001079795,0.020223442,0.1078816,0.0003198474],"about_ca_topic_score_codex":0.00026322002,"about_ca_topic_score_gemma":0.00009873957,"teacher_disagreement_score":0.99222136,"about_ca_system_score_codex":0.00014624298,"about_ca_system_score_gemma":0.000021624155,"threshold_uncertainty_score":0.91354704},"labels":[],"label_agreement":null},{"id":"W4391921073","doi":"10.37256/jeee.3120244132","title":"A Novel Design of a Low-Cost SCADA System for Monitoring Standalone Photovoltaic Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Electronics and Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"SCADA; Photovoltaic system; Computer science; Embedded system; Flexibility (engineering); Reliability engineering; Real-time computing; Systems engineering; Engineering; Electrical engineering","score_opus":0.00967066357316659,"score_gpt":0.201922518610816,"score_spread":0.1922518550376494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391921073","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03599977,0.036738403,0.9256575,0.000006173201,0.0011660178,0.00028307218,0.0000045115034,0.0001295744,0.000014952218],"genre_scores_gemma":[0.9934464,0.0014757194,0.0044678138,9.883776e-7,0.00048022586,0.000038812137,7.512163e-7,0.000075179916,0.000014101818],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985255,0.000008796793,0.0005812185,0.00013794431,0.0002741418,0.00047241274],"domain_scores_gemma":[0.999358,0.00024115731,0.000071990406,0.00010310329,0.000105223684,0.00012051863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005555438,0.0002139363,0.00042733146,0.00041669977,0.000030060073,0.00009907154,0.00014332563,0.00009105733,4.3600045e-7],"category_scores_gemma":[0.000048542355,0.00019655318,0.00011667058,0.0004999165,0.000006913705,0.00015621963,0.000015225662,0.00035106167,2.907091e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003039222,0.00001284644,0.000007164129,0.0011651615,0.00028459312,0.000013398286,0.000023923076,0.8057724,0.18981004,0.0017636007,0.00012777279,0.0009886792],"study_design_scores_gemma":[0.00046599493,0.0002515856,0.00002221874,0.00075336697,0.000097439006,0.0001873219,0.000014522766,0.95603204,0.038900863,0.000009351238,0.003083508,0.00018181317],"about_ca_topic_score_codex":0.000004432996,"about_ca_topic_score_gemma":2.0741913e-7,"teacher_disagreement_score":0.95744663,"about_ca_system_score_codex":0.00058252737,"about_ca_system_score_gemma":0.00008130833,"threshold_uncertainty_score":0.80152065},"labels":[],"label_agreement":null},{"id":"W4391972335","doi":"10.32920/25234747.v1","title":"Cloud-based Smart Dual Fuel Switching System (SDFSS) of Hybrid Residential HVAC System for Simultaneous Reduction of Energy Cost and Greenhouse Gas Emission","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"HVAC; Greenhouse gas; Renewable energy; Environmental science; Automotive engineering; Hybrid system; Heating system; Fossil fuel; Air conditioning; Environmental economics; Engineering; Waste management; Computer science; Electrical engineering","score_opus":0.009225042815494798,"score_gpt":0.21230809844535817,"score_spread":0.20308305562986337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391972335","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7445253,0.002265775,0.22556551,0.00008419106,0.018733406,0.0022177957,0.00034209932,0.0028711904,0.003394719],"genre_scores_gemma":[0.99677694,0.000095880794,0.0012808092,0.0000025059737,0.00092187844,0.00020535989,0.0001041016,0.00020380116,0.000408725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99712044,0.00008659029,0.0011834905,0.0007165269,0.0005040051,0.00038893576],"domain_scores_gemma":[0.99831724,0.00024048965,0.0003107918,0.0007893108,0.00019027345,0.00015187473],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051550445,0.00055730203,0.0008839666,0.0005306002,0.00006203185,0.00008961682,0.00027563496,0.00026228838,0.0000063641587],"category_scores_gemma":[0.0000613545,0.0005610458,0.0002776027,0.00016393332,0.00003788878,0.00005129514,0.00056804775,0.00034165618,0.0000024203462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023696876,0.00003186358,0.0000075656944,0.038797416,0.0004836372,0.00009560689,0.00007747705,0.9451503,0.009656978,0.0018343653,0.0024725888,0.0011552012],"study_design_scores_gemma":[0.000725669,0.00010822419,0.000003926578,0.0042682556,0.0005105345,0.00009148575,0.00041383732,0.8586187,0.13375323,0.00015712211,0.0008590347,0.0004900154],"about_ca_topic_score_codex":0.001414121,"about_ca_topic_score_gemma":0.00015156291,"teacher_disagreement_score":0.25225163,"about_ca_system_score_codex":0.0005725115,"about_ca_system_score_gemma":0.000090745736,"threshold_uncertainty_score":0.9996841},"labels":[],"label_agreement":null},{"id":"W4391980774","doi":"10.32920/25234747","title":"Cloud-based Smart Dual Fuel Switching System (SDFSS) of Hybrid Residential HVAC System for Simultaneous Reduction of Energy Cost and Greenhouse Gas Emission","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"HVAC; Greenhouse gas; Cloud computing; Reduction (mathematics); Dual (grammatical number); Environmental science; Automotive engineering; Computer science; Environmental economics; Engineering; Air conditioning; Operating system; Mechanical engineering; Economics","score_opus":0.009225042815494798,"score_gpt":0.21230809844535817,"score_spread":0.20308305562986337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391980774","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7445253,0.002265775,0.22556551,0.00008419106,0.018733406,0.0022177957,0.00034209932,0.0028711904,0.003394719],"genre_scores_gemma":[0.99677694,0.000095880794,0.0012808092,0.0000025059737,0.00092187844,0.00020535989,0.0001041016,0.00020380116,0.000408725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99712044,0.00008659029,0.0011834905,0.0007165269,0.0005040051,0.00038893576],"domain_scores_gemma":[0.99831724,0.00024048965,0.0003107918,0.0007893108,0.00019027345,0.00015187473],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051550445,0.00055730203,0.0008839666,0.0005306002,0.00006203185,0.00008961682,0.00027563496,0.00026228838,0.0000063641587],"category_scores_gemma":[0.0000613545,0.0005610458,0.0002776027,0.00016393332,0.00003788878,0.00005129514,0.00056804775,0.00034165618,0.0000024203462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023696876,0.00003186358,0.0000075656944,0.038797416,0.0004836372,0.00009560689,0.00007747705,0.9451503,0.009656978,0.0018343653,0.0024725888,0.0011552012],"study_design_scores_gemma":[0.000725669,0.00010822419,0.000003926578,0.0042682556,0.0005105345,0.00009148575,0.00041383732,0.8586187,0.13375323,0.00015712211,0.0008590347,0.0004900154],"about_ca_topic_score_codex":0.001414121,"about_ca_topic_score_gemma":0.00015156291,"teacher_disagreement_score":0.25225163,"about_ca_system_score_codex":0.0005725115,"about_ca_system_score_gemma":0.000090745736,"threshold_uncertainty_score":0.9996841},"labels":[],"label_agreement":null},{"id":"W4392079320","doi":"10.32920/25266610.v1","title":"Fuzzy Optimization Model of an Incremental Capacity Auction Formulation with GHG Consideration","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Greenhouse gas; Electricity generation; Renewable energy; Capacity optimization; Minification; Mathematical optimization; Reduction (mathematics); Computer science; Environmental science; Environmental economics; Economics; Power (physics); Mathematics; Engineering","score_opus":0.0240268497238232,"score_gpt":0.21086280815448968,"score_spread":0.18683595843066647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392079320","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30996102,0.000014499361,0.6784459,0.000022878558,0.00048546548,0.00036156323,0.00001886163,0.000529374,0.0101604685],"genre_scores_gemma":[0.89307845,0.000016738031,0.10614244,0.000011666132,0.00010792008,0.00006210141,0.00045324,0.00005206619,0.00007539064],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899274,0.000018332606,0.000327079,0.00027408957,0.00026433414,0.00012343994],"domain_scores_gemma":[0.99950194,0.0000069265393,0.000066935616,0.00030024187,0.00008445947,0.00003950121],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013914735,0.00022779216,0.00019098075,0.00023242716,0.00003254762,0.00007567166,0.00007074437,0.00016798309,0.000030466552],"category_scores_gemma":[0.000004212864,0.00022074049,0.000041735482,0.000098449564,0.000017399943,0.00025053247,0.00012739137,0.00022468099,0.0000037913867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010888764,0.000018093153,0.000023033268,0.0003437604,0.000104812214,4.6079992e-7,0.00015998965,0.9924451,0.00071944355,0.0058579724,0.0001718938,0.0001445455],"study_design_scores_gemma":[0.00017269453,0.0000323892,0.000056671568,0.0000816772,0.00009796473,0.0000017608036,0.000042233507,0.9872825,0.0072468147,0.0047532218,0.0000038080502,0.00022827844],"about_ca_topic_score_codex":0.0002097236,"about_ca_topic_score_gemma":0.00037742467,"teacher_disagreement_score":0.5831174,"about_ca_system_score_codex":0.0002794036,"about_ca_system_score_gemma":0.000030072713,"threshold_uncertainty_score":0.9001536},"labels":[],"label_agreement":null},{"id":"W4392081835","doi":"10.32920/25266610","title":"Fuzzy Optimization Model of an Incremental Capacity Auction Formulation with GHG Consideration","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Greenhouse gas; Capacity optimization; Electricity generation; Renewable energy; Mathematical optimization; Minification; Environmental economics; Computer science; Environmental science; Economics; Power (physics); Mathematics; Engineering","score_opus":0.0240268497238232,"score_gpt":0.21086280815448968,"score_spread":0.18683595843066647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392081835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30996102,0.000014499361,0.6784459,0.000022878558,0.00048546548,0.00036156323,0.00001886163,0.000529374,0.0101604685],"genre_scores_gemma":[0.89307845,0.000016738031,0.10614244,0.000011666132,0.00010792008,0.00006210141,0.00045324,0.00005206619,0.00007539064],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899274,0.000018332606,0.000327079,0.00027408957,0.00026433414,0.00012343994],"domain_scores_gemma":[0.99950194,0.0000069265393,0.000066935616,0.00030024187,0.00008445947,0.00003950121],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013914735,0.00022779216,0.00019098075,0.00023242716,0.00003254762,0.00007567166,0.00007074437,0.00016798309,0.000030466552],"category_scores_gemma":[0.000004212864,0.00022074049,0.000041735482,0.000098449564,0.000017399943,0.00025053247,0.00012739137,0.00022468099,0.0000037913867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010888764,0.000018093153,0.000023033268,0.0003437604,0.000104812214,4.6079992e-7,0.00015998965,0.9924451,0.00071944355,0.0058579724,0.0001718938,0.0001445455],"study_design_scores_gemma":[0.00017269453,0.0000323892,0.000056671568,0.0000816772,0.00009796473,0.0000017608036,0.000042233507,0.9872825,0.0072468147,0.0047532218,0.0000038080502,0.00022827844],"about_ca_topic_score_codex":0.0002097236,"about_ca_topic_score_gemma":0.00037742467,"teacher_disagreement_score":0.5831174,"about_ca_system_score_codex":0.0002794036,"about_ca_system_score_gemma":0.000030072713,"threshold_uncertainty_score":0.9001536},"labels":[],"label_agreement":null},{"id":"W4392094980","doi":"10.1007/s10994-024-06514-1","title":"Correction to: Multi-agent reinforcement learning for fast-timescale demand response of residential loads","year":2024,"lang":"en","type":"article","venue":"Machine Learning","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université de Montréal; Polytechnique Montréal; Mila - Quebec Artificial Intelligence Institute","funders":"","keywords":"Reinforcement learning; Computer science; Reinforcement; Demand response; Artificial intelligence; Engineering; Structural engineering; Electrical engineering","score_opus":0.00856574228745731,"score_gpt":0.2416009840240008,"score_spread":0.2330352417365435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392094980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13430054,0.00054462417,0.8592755,0.00010849796,0.003624133,0.00037688515,0.0000016213125,0.0007922527,0.0009759217],"genre_scores_gemma":[0.97270375,0.00003561652,0.002014404,0.000019395138,0.00021511328,0.00009239851,0.000036476267,0.00008724032,0.02479561],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865127,0.000116850184,0.0003765972,0.00028478005,0.00024067608,0.00032984602],"domain_scores_gemma":[0.99938023,0.00028072542,0.000041665833,0.00017014162,0.00003915005,0.00008807988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008762412,0.00021169746,0.00021886834,0.00037544777,0.00013529063,0.00008616098,0.00013064368,0.000057467663,0.00014798314],"category_scores_gemma":[0.00037707726,0.00022614823,0.0001287674,0.00032230146,0.000015586,0.00011607237,0.00011080001,0.00033380892,0.00007227862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021626221,0.000009535532,0.0008812382,0.00019079109,0.00010972877,0.000009224848,0.00094129966,0.9675601,0.018946912,0.000028155475,0.0058520245,0.0052547096],"study_design_scores_gemma":[0.00039874224,0.00024084497,0.0024497486,0.00018797042,0.000049023394,0.0000041980334,0.00011690237,0.8943477,0.010987769,0.0000024044357,0.0910089,0.0002057628],"about_ca_topic_score_codex":0.0001110438,"about_ca_topic_score_gemma":0.00004812237,"teacher_disagreement_score":0.8572611,"about_ca_system_score_codex":0.00018105471,"about_ca_system_score_gemma":0.0000170798,"threshold_uncertainty_score":0.92220575},"labels":[],"label_agreement":null},{"id":"W4392139346","doi":"10.1016/j.apenergy.2024.122883","title":"A distributed VPP-integrated co-optimization framework for energy scheduling, frequency regulation, and voltage support using data-driven distributionally robust optimization with Wasserstein metric","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Robust optimization; Mathematical optimization; Metric (unit); Scheduling (production processes); Computer science; Demand response; Voltage; Engineering; Electricity; Electrical engineering; Mathematics; Operations management","score_opus":0.017243124842313235,"score_gpt":0.22882907111807432,"score_spread":0.21158594627576108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392139346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00045062375,0.00028743414,0.99675745,0.000053240125,0.00028664107,0.00020484031,0.0007210669,0.00077288673,0.00046581344],"genre_scores_gemma":[0.516865,0.0001911409,0.445035,0.00004249718,0.00028303586,0.0001701257,0.0372129,0.00014553491,0.000054754848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998025,0.00002196511,0.00047705675,0.0007020501,0.000342068,0.00043186804],"domain_scores_gemma":[0.99888206,0.00015261088,0.00009650676,0.0005869123,0.00014149533,0.00014042374],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018662827,0.00040590932,0.00032995312,0.00038555558,0.00018841728,0.0002871055,0.0003057106,0.00024478193,0.00011921733],"category_scores_gemma":[0.00004908483,0.00039815277,0.00004603721,0.001457665,0.00007140176,0.0004376768,0.00008979556,0.00014603154,0.000001507659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025466985,0.000025112064,0.000028500168,0.00007706772,0.00027406123,0.0000063457956,0.000012647556,0.83499974,0.00020468436,0.16278327,0.0010763386,0.00048676832],"study_design_scores_gemma":[0.00040725153,0.000044381744,0.00002857484,0.000086287735,0.00021392823,0.0000082483075,0.000043019914,0.9898252,0.0007907727,0.0010949777,0.0069927997,0.00046454105],"about_ca_topic_score_codex":0.0001178274,"about_ca_topic_score_gemma":0.00004351262,"teacher_disagreement_score":0.5517224,"about_ca_system_score_codex":0.0003823282,"about_ca_system_score_gemma":0.00010820081,"threshold_uncertainty_score":0.99984705},"labels":[],"label_agreement":null},{"id":"W4392152135","doi":"10.1109/tpwrs.2024.3369591","title":"Physics-Guided Multi-Agent Adversarial Reinforcement Learning for Robust Active Voltage Control With Peer-to-Peer (P2P) Energy Trading","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; McGill University; Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Adversarial system; Peer-to-peer; Computer science; Energy (signal processing); Control (management); Computer security; Distributed computing; Artificial intelligence; Physics","score_opus":0.019221710220685806,"score_gpt":0.22577662580230973,"score_spread":0.20655491558162392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392152135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00059423456,0.000055494005,0.98614454,0.00011555131,0.0093247825,0.0009805638,0.00005856702,0.00097207836,0.0017541866],"genre_scores_gemma":[0.9859847,0.0000070235915,0.00061161676,0.000055796227,0.00024366747,0.0011737689,0.000024092793,0.00017859497,0.01172077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977446,0.000045915334,0.00045768224,0.0005133396,0.0006775244,0.0005609281],"domain_scores_gemma":[0.99907714,0.00014947378,0.00004991778,0.0003492065,0.00017915838,0.00019512522],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003002982,0.00045071027,0.00041711092,0.0003262447,0.00022399773,0.00022928201,0.00019847526,0.00012384636,0.000053762826],"category_scores_gemma":[0.000006966311,0.00042706786,0.00022553925,0.00039492876,0.000024671923,0.00030484152,0.0000018962754,0.00032555687,0.000052175936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013613848,0.000051525807,9.866491e-7,0.0001691789,0.0010806073,0.000020702108,0.0012135304,0.988869,0.0018577261,0.00040883664,0.005231111,0.0009606435],"study_design_scores_gemma":[0.001833518,0.00031359054,0.00000429301,0.00025149755,0.00021123899,0.000008836436,0.0005609945,0.88284063,0.0065642023,0.000001327467,0.10694835,0.000461537],"about_ca_topic_score_codex":0.0002506578,"about_ca_topic_score_gemma":0.000060181876,"teacher_disagreement_score":0.98553294,"about_ca_system_score_codex":0.00072213233,"about_ca_system_score_gemma":0.000041829506,"threshold_uncertainty_score":0.9998181},"labels":[],"label_agreement":null},{"id":"W4392165424","doi":"10.21203/rs.3.rs-3970938/v1","title":"Centralized Smart Energy Monitoring System for Legacy Home Appliances","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Applied Science Private University","keywords":"Business; Embedded system; Computer security; Computer science; Telecommunications","score_opus":0.052502293782971526,"score_gpt":0.33857388978911496,"score_spread":0.2860715960061434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392165424","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33062086,0.18710063,0.10554607,0.002472944,0.15470295,0.018196682,0.0017533515,0.029689785,0.16991672],"genre_scores_gemma":[0.98732096,0.0014706735,0.00094680133,0.0000020791533,0.0036770133,0.004486695,0.00015315201,0.00026961768,0.0016729807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961224,0.00012951059,0.00048499485,0.0008269806,0.001142519,0.0012935499],"domain_scores_gemma":[0.99819684,0.00025763837,0.00003720817,0.001003077,0.00024288218,0.0002623558],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0010209213,0.00047824348,0.00056210294,0.00071811676,0.00017593049,0.0010533091,0.00086591847,0.0003709375,0.000025731408],"category_scores_gemma":[0.000039420476,0.00048907445,0.000322276,0.0005371792,0.00006324465,0.00014027965,0.0014997093,0.001135701,0.000145557],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012474027,0.000082649356,0.0006063527,0.08907669,0.0017911774,0.0003171232,0.000527139,0.7635952,0.001094802,0.057987727,0.0600254,0.02477095],"study_design_scores_gemma":[0.0014110492,0.00015650825,0.0009895731,0.014847634,0.00019713414,0.000009654019,0.0038827846,0.2802289,0.023005432,0.0070314584,0.66613734,0.002102544],"about_ca_topic_score_codex":0.00038585343,"about_ca_topic_score_gemma":0.000035092326,"teacher_disagreement_score":0.65670013,"about_ca_system_score_codex":0.001427356,"about_ca_system_score_gemma":0.00011753569,"threshold_uncertainty_score":0.99998367},"labels":[],"label_agreement":null},{"id":"W4392255272","doi":"10.1145/3638209.3638211","title":"Assessing the Effectiveness of Supervised and Semi-supervised NILM Approaches in an Industrial Context","year":2023,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Machine learning; Artificial intelligence; Context (archaeology); Supervised learning; Artificial neural network; Energy consumption; Data mining; Regression analysis; Engineering","score_opus":0.09404407097871972,"score_gpt":0.26418843302516887,"score_spread":0.17014436204644914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392255272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99463046,0.00005519915,0.0008682572,0.000036877977,0.0002566545,0.0002931065,0.0000013630338,0.00022176583,0.0036363069],"genre_scores_gemma":[0.9997218,0.000011168144,0.00005875132,0.000011714227,0.00007021432,0.00006215059,0.000015647463,0.000028383683,0.000020135305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990551,0.0002378107,0.00019288532,0.00017345644,0.00013570543,0.00020505636],"domain_scores_gemma":[0.99927646,0.00042102445,0.000012165462,0.0002391213,0.0000122584415,0.00003895216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011041105,0.00013476123,0.00020876572,0.00014762103,0.00003436964,0.00007269423,0.0001550666,0.00008314137,0.000016140131],"category_scores_gemma":[0.000045786965,0.00010214622,0.000027631615,0.0004911106,0.00004707421,0.0002903414,0.00008310263,0.0001381772,0.0000038646895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008587194,0.000095271396,0.2131745,0.0005946343,0.00019342604,0.000019628318,0.001491294,0.7023135,0.01867928,0.0046471823,0.00048103873,0.058224354],"study_design_scores_gemma":[0.0018276373,0.00004000666,0.29422662,0.000100073725,0.00002021871,9.534161e-7,0.0039310087,0.68718994,0.0121379215,0.00012486329,0.00018221835,0.00021856392],"about_ca_topic_score_codex":0.00011824338,"about_ca_topic_score_gemma":0.000088676315,"teacher_disagreement_score":0.08105211,"about_ca_system_score_codex":0.00003722547,"about_ca_system_score_gemma":0.00001113145,"threshold_uncertainty_score":0.4165402},"labels":[],"label_agreement":null},{"id":"W4392309966","doi":"10.2139/ssrn.4743225","title":"Using a Ledger to Facilitate Autonomous Peer-to-Peer Virtual Net Metering of Solar Pho-Tovoltaic Distributed Generation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Net metering; Ledger; Metering mode; Net (polyhedron); Peer-to-peer; Distributed ledger; Computer science; Distributed computing; Distributed generation; Computer network; Computer security; Blockchain; Electrical engineering; Business; Engineering; Mathematics; Mechanical engineering; Renewable energy; Finance","score_opus":0.03792992162289332,"score_gpt":0.2524994389524632,"score_spread":0.21456951732956986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392309966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45241076,0.0011424237,0.54215765,0.00032655438,0.0031133094,0.00033584674,0.00012482093,0.00022284807,0.00016579352],"genre_scores_gemma":[0.99325573,0.00023435582,0.0027688632,0.000037609316,0.0012899966,0.000055936172,0.00018513143,0.00017867654,0.0019936673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953325,0.00009114929,0.00090388063,0.00057649356,0.00083432277,0.0022616975],"domain_scores_gemma":[0.99872327,0.000026157137,0.00013550988,0.0005349188,0.00033713385,0.00024301949],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0021200194,0.00060527475,0.0006456677,0.0007297741,0.000120802964,0.0002822178,0.00059019047,0.0002591087,0.000034586436],"category_scores_gemma":[0.0001237643,0.0006534268,0.0003252093,0.00044720015,0.00002315771,0.00012434775,0.0008440342,0.0032374086,0.00008389841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020422387,0.000019420822,0.000011829172,0.000102472804,0.0009888,0.000016393482,0.0005842371,0.9569081,0.03277155,0.0012506838,0.002127607,0.005198466],"study_design_scores_gemma":[0.0006235137,0.00046525884,0.000088412955,0.00038677285,0.0006334194,0.00021103758,0.0007048252,0.93646985,0.012339082,0.010623107,0.03594173,0.0015130058],"about_ca_topic_score_codex":0.00023711273,"about_ca_topic_score_gemma":0.00062651414,"teacher_disagreement_score":0.54084504,"about_ca_system_score_codex":0.0050768307,"about_ca_system_score_gemma":0.001017775,"threshold_uncertainty_score":0.9995917},"labels":[],"label_agreement":null},{"id":"W4392389636","doi":"10.1109/isgt59692.2024.10454125","title":"Frequency Dynamics-aware Real-time Marginal Pricing of Electricity Under Uncertainty","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Dynamics (music); Electricity pricing; Computer science; Econometrics; Electricity market; Economics; Electrical engineering; Engineering; Physics","score_opus":0.005442729601090557,"score_gpt":0.20220159470559182,"score_spread":0.19675886510450127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392389636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46096012,0.0003571878,0.2951783,0.00030855119,0.0010300247,0.0002715442,0.000018745137,0.0026159072,0.23925962],"genre_scores_gemma":[0.9963349,0.00011615186,0.0012866812,0.000018481418,0.000089628295,0.0000109251605,0.000029282077,0.000045816938,0.002068139],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990865,0.000015130734,0.00023267146,0.00019803409,0.00018768328,0.00027999745],"domain_scores_gemma":[0.99961185,0.00006386345,0.000013565657,0.00023457294,0.000028289753,0.000047868896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001378244,0.00016064013,0.000171513,0.00019895374,0.000023426457,0.000032496566,0.00014878817,0.000060239432,0.00048270394],"category_scores_gemma":[0.000005699045,0.0001499702,0.000068687325,0.00051672896,0.000019684809,0.000108159205,0.00003922608,0.00012804945,0.00009744094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021973158,0.0000135488235,0.0003067855,0.00026964297,0.00016930245,0.000021603104,0.000037729777,0.921939,0.0071323593,0.06383914,0.00438583,0.001882835],"study_design_scores_gemma":[0.00007338628,0.00002208064,0.0019293169,0.00005441725,0.000031743,0.0000037850195,0.000034368484,0.9946973,0.0011808074,0.0015419692,0.0002505701,0.00018028385],"about_ca_topic_score_codex":0.0006996355,"about_ca_topic_score_gemma":0.00016441563,"teacher_disagreement_score":0.53537476,"about_ca_system_score_codex":0.0004821351,"about_ca_system_score_gemma":0.000026934546,"threshold_uncertainty_score":0.61156076},"labels":[],"label_agreement":null},{"id":"W4392472105","doi":"10.3390/su16052156","title":"Residential Prosumer Energy Management System with Renewable Integration Considering Multi-Energy Storage and Demand Response","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Prosumer; Demand response; Renewable energy; Environmental economics; Energy storage; Energy management; Energy engineering; Business; Variable renewable energy; Energy (signal processing); Environmental science; Natural resource economics; Electricity; Engineering; Economics; Electrical engineering; Power (physics)","score_opus":0.005096912801047532,"score_gpt":0.2042120312595261,"score_spread":0.19911511845847857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392472105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13696358,0.0015640169,0.8580285,0.00022491987,0.0006032041,0.00040767333,0.0000055859264,0.0012969071,0.0009056421],"genre_scores_gemma":[0.9946752,0.000053922035,0.0018408708,0.0000141543005,0.00007308243,0.0002846104,0.000011387371,0.00006506952,0.0029816611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983328,0.00018349009,0.0003145087,0.0005221378,0.0002502515,0.00039680596],"domain_scores_gemma":[0.9991642,0.00009249505,0.000025466268,0.0004831502,0.00013055293,0.00010408951],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007248066,0.0002827167,0.00022854123,0.00029236922,0.000128101,0.00025474047,0.000112525995,0.00008310233,0.0000119022025],"category_scores_gemma":[0.000047875477,0.0002523436,0.00004634755,0.00037255243,0.00009790332,0.00032559872,0.00014023848,0.00010688763,0.0000015612999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067770807,0.000055129643,0.000694348,0.004814977,0.0004629398,0.0013184121,0.00078240404,0.92569476,0.0005606584,0.054209806,0.0033534914,0.0073753665],"study_design_scores_gemma":[0.0011771591,0.00017476376,0.0083352355,0.0005757415,0.0002149138,0.00006845771,0.004490573,0.8959509,0.005032595,0.0012176983,0.081902735,0.0008591964],"about_ca_topic_score_codex":0.00115616,"about_ca_topic_score_gemma":0.0011823026,"teacher_disagreement_score":0.8577117,"about_ca_system_score_codex":0.0014626607,"about_ca_system_score_gemma":0.00007503426,"threshold_uncertainty_score":0.9999929},"labels":[],"label_agreement":null},{"id":"W4392481354","doi":"10.1016/j.aej.2024.02.033","title":"Smart home energy management systems: Research challenges and survey","year":2024,"lang":"en","type":"article","venue":"Alexandria Engineering Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architectural engineering; Environmental resource management; Computer science; Environmental science; Environmental economics; Geography; Business; Engineering; Economics","score_opus":0.04289504293394584,"score_gpt":0.2468280231368012,"score_spread":0.20393298020285536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392481354","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13425596,0.66804683,0.12816694,0.000525529,0.034413923,0.0005678279,0.000030109371,0.0035511027,0.030441778],"genre_scores_gemma":[0.9269625,0.07023774,0.00062411826,0.0000051914867,0.00089899695,0.00005098367,0.0000070761776,0.00013511532,0.0010783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981597,0.000099204146,0.00033845427,0.00028638617,0.00049963006,0.00061661063],"domain_scores_gemma":[0.99917996,0.00024112787,0.000012755111,0.00027874162,0.000060974166,0.00022647106],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018754059,0.00025950556,0.0002455143,0.0008255455,0.000092734575,0.0004650603,0.00025768206,0.00009324126,0.000023745852],"category_scores_gemma":[0.000021203536,0.0002526233,0.00005484108,0.0003646438,0.00002768118,0.00025484784,0.00013058128,0.00051105994,0.000041685453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013687637,0.000024811598,0.00014331058,0.001863677,0.0012744928,0.0012150852,0.0005172108,0.88085425,0.00025355944,0.06395195,0.027180137,0.022707801],"study_design_scores_gemma":[0.00042239833,0.00007640156,0.02316533,0.00097044633,0.000053670206,0.0006048318,0.00019578339,0.51340044,0.00005799244,0.00017702681,0.4602954,0.0005802768],"about_ca_topic_score_codex":0.000020974321,"about_ca_topic_score_gemma":0.000017289216,"teacher_disagreement_score":0.79270655,"about_ca_system_score_codex":0.00020048831,"about_ca_system_score_gemma":0.000011207247,"threshold_uncertainty_score":0.9999926},"labels":[],"label_agreement":null},{"id":"W4392529864","doi":"10.1016/j.egyr.2024.03.001","title":"Smart energy management using green computing","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Energy management; Green computing; Computer science; Energy (signal processing); Telecommunications; Cloud computing; Physics; Operating system","score_opus":0.008322181093252615,"score_gpt":0.201999650344287,"score_spread":0.19367746925103438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392529864","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045850027,0.0056027644,0.66220313,0.000116188676,0.0149447005,0.000118280186,0.0000022457875,0.005073524,0.2660891],"genre_scores_gemma":[0.9893535,0.00014089397,0.0028527349,0.0001331125,0.0007572404,0.000018844921,0.000031460364,0.00013570458,0.00657653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99817693,0.000022626517,0.00050464727,0.0004827583,0.00034656288,0.00046647913],"domain_scores_gemma":[0.99924886,0.000023359324,0.000042559837,0.0005514576,0.000019639414,0.00011414845],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020967236,0.00029916313,0.00022827355,0.00033151603,0.00008786491,0.00013141338,0.00013749198,0.000081008366,0.000093666386],"category_scores_gemma":[0.0000024905573,0.00031858645,0.000129846,0.0004969533,0.00002605354,0.00016417907,0.00020091965,0.00009773533,0.000011839206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017904883,0.000016523994,0.00019600848,0.00017961895,0.0004863802,0.008281868,0.000053544638,0.90042263,0.0003311964,0.025252955,0.011964354,0.05281311],"study_design_scores_gemma":[0.000046435624,0.000008617989,0.00019279853,0.00012075496,0.000058715617,0.00032569887,0.000013691017,0.46188998,0.001249363,0.00077180343,0.5350134,0.0003087363],"about_ca_topic_score_codex":0.0006367544,"about_ca_topic_score_gemma":0.00009202814,"teacher_disagreement_score":0.94350344,"about_ca_system_score_codex":0.00022193388,"about_ca_system_score_gemma":0.000013741615,"threshold_uncertainty_score":0.9999266},"labels":[],"label_agreement":null},{"id":"W4392628588","doi":"10.26868/25222708.2023.1175","title":"Using surrogate modelling and stochastic optimization for optimal day-ahead demand response strategies under weather uncertainty","year":2023,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demand response; Robustness (evolution); Computer science; HVAC; Flexibility (engineering); Mathematical optimization; Surrogate model; Renewable energy; Stochastic programming; Stochastic optimization; Electricity; Air conditioning; Engineering; Machine learning; Mathematics","score_opus":0.06472494548077462,"score_gpt":0.2980382211994312,"score_spread":0.23331327571865657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392628588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45300293,0.000016809641,0.5462055,0.00003456777,0.0001003957,0.00023269423,0.0000035276548,0.00037627167,0.00002730563],"genre_scores_gemma":[0.96398956,0.00001467758,0.03572518,0.000011512462,0.000092289476,0.000050070972,0.000014337547,0.00006313725,0.000039240567],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880046,0.000014121049,0.00028789593,0.00033852074,0.00019715237,0.00036184676],"domain_scores_gemma":[0.9992484,0.00028501617,0.00007124024,0.00008368112,0.00023779883,0.000073855015],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006510213,0.00023893501,0.00020207209,0.0003145903,0.00021130063,0.0003596793,0.00010753348,0.00010712347,0.000012971853],"category_scores_gemma":[0.000088705965,0.00026626373,0.000037447877,0.0003778415,0.000043967197,0.0006333956,0.00005362149,0.00009409957,0.0000018454758],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009664542,0.000004319014,0.000026419957,0.00008912816,0.000036306537,3.363037e-7,0.0008429291,0.9915805,0.0017288589,0.005463185,0.000013939968,0.00011744671],"study_design_scores_gemma":[0.0005107791,0.000030445293,0.00007936563,0.00012455898,0.000046055742,0.0000010085728,0.0011744776,0.99544734,0.00014709981,0.0020912553,0.000058717844,0.00028892336],"about_ca_topic_score_codex":0.0000094518045,"about_ca_topic_score_gemma":7.9735196e-7,"teacher_disagreement_score":0.5109866,"about_ca_system_score_codex":0.00011441722,"about_ca_system_score_gemma":0.000037627015,"threshold_uncertainty_score":0.99997896},"labels":[],"label_agreement":null},{"id":"W4392728966","doi":"10.1016/j.ijhydene.2024.03.073","title":"A two-stage risk-based framework for dynamic configuration of a renewable-based distribution system considering demand response programs and hydrogen storage systems","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Hydrogen storage; Demand response; Renewable energy; Stage (stratigraphy); Computer science; Environmental economics; Hydrogen; Chemistry; Economics; Electrical engineering; Engineering","score_opus":0.009511977770583957,"score_gpt":0.24110193558194104,"score_spread":0.23158995781135708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392728966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35378376,0.0018676751,0.6430254,0.00006712558,0.0008922211,0.00013305017,0.00011178814,0.00009879503,0.000020200732],"genre_scores_gemma":[0.9976003,0.000052645755,0.0018575869,0.0000117640875,0.00021195704,0.00006674741,0.00011641553,0.000052381944,0.00003016127],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998158,0.00015306752,0.00076212565,0.00019681493,0.00052621943,0.00020380295],"domain_scores_gemma":[0.99863446,0.0004782781,0.00034659944,0.00016433455,0.000275221,0.00010112679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009781753,0.00021768444,0.00031900837,0.00036087877,0.00004873033,0.00017559553,0.00024529282,0.00010452133,0.000004540848],"category_scores_gemma":[0.00012465731,0.0002114851,0.00017835206,0.00014897209,0.00006202396,0.00018784443,0.000025385087,0.00014011387,7.165347e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004951188,0.00003155996,0.000119537195,0.0002807439,0.0006881194,0.00015793456,0.00004448062,0.9826246,0.0075974544,0.0072787385,0.00004633647,0.0006354095],"study_design_scores_gemma":[0.0010033959,0.00016927703,0.000027431453,0.0012257937,0.00014159286,0.00008776405,0.000095470285,0.9534356,0.035225913,0.00019360663,0.008213092,0.00018104211],"about_ca_topic_score_codex":0.00013067614,"about_ca_topic_score_gemma":0.0000387348,"teacher_disagreement_score":0.6438166,"about_ca_system_score_codex":0.00057170406,"about_ca_system_score_gemma":0.0001246972,"threshold_uncertainty_score":0.86241114},"labels":[],"label_agreement":null},{"id":"W4392778117","doi":"10.1016/j.epsr.2024.110266","title":"Optimal robust collaborative management of multiple EHs in power systems by utilizing the game theory","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Game theory; Electric power system; Computer science; Power (physics); Operations research; Mathematical economics; Engineering; Economics; Physics","score_opus":0.022268170380434486,"score_gpt":0.2775658957792706,"score_spread":0.2552977253988361,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392778117","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28703392,0.32111636,0.06897401,0.0003106521,0.0100971805,0.009188316,0.0001521635,0.0015133746,0.30161402],"genre_scores_gemma":[0.994079,0.00085102365,0.000034885492,0.0000033654164,0.000050787537,0.0007246344,0.000009326987,0.00010308766,0.004143924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99563825,0.0008502194,0.0006640201,0.00051552267,0.0012770132,0.0010549817],"domain_scores_gemma":[0.99822795,0.00072277547,0.00004270145,0.00070676865,0.00019403028,0.00010578832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047757383,0.00030475316,0.00040399755,0.0009112428,0.000103148544,0.00034844378,0.0007415129,0.00013765003,0.000033299242],"category_scores_gemma":[0.00007558654,0.00023858077,0.000077055345,0.0042944066,0.000089423884,0.00020231892,0.00021506089,0.00075288676,0.00011347251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008228208,0.00009834024,0.00010425027,0.0016187048,0.00095057476,0.0002975523,0.0018975202,0.8728846,0.0023754584,0.041505475,0.07774116,0.0004440958],"study_design_scores_gemma":[0.0006840176,0.00022928986,0.0005576179,0.0012473121,0.000031533153,0.000019805266,0.014512561,0.8261312,0.0012661129,0.000029223214,0.15480761,0.00048369876],"about_ca_topic_score_codex":0.00026488004,"about_ca_topic_score_gemma":0.000010176901,"teacher_disagreement_score":0.707045,"about_ca_system_score_codex":0.0007878459,"about_ca_system_score_gemma":0.000077073724,"threshold_uncertainty_score":0.97290415},"labels":[],"label_agreement":null},{"id":"W4392942907","doi":"10.1109/icetsis61505.2024.10459405","title":"Distributed Energy Sources Management using Shuffled Frog-Leaping Algorithm for Optimizing the Environmental and Economic Indices of Smart Microgrid","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Microgrid; Computer science; Distributed generation; Energy management; Energy (signal processing); Algorithm; Distributed computing; Engineering; Artificial intelligence; Electrical engineering; Renewable energy; Mathematics; Control (management); Statistics","score_opus":0.006820541349946087,"score_gpt":0.18705933317360937,"score_spread":0.18023879182366329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392942907","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3152431,0.00680297,0.67520124,0.000091740694,0.0010653513,0.00038671598,0.0001617523,0.00035193883,0.00069517543],"genre_scores_gemma":[0.95478326,0.0013776466,0.04313966,0.00004837083,0.00023969078,0.00009217279,0.00009347856,0.00007966479,0.0001460417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912137,0.000013448233,0.00027471926,0.0002480356,0.00008498717,0.0002574378],"domain_scores_gemma":[0.99967736,0.0000747739,0.00003188832,0.00017346989,0.0000020331306,0.000040495383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001547242,0.00019377467,0.00017801009,0.00013023465,0.00009375636,0.00012189767,0.0001605408,0.00004325381,0.000055846114],"category_scores_gemma":[5.3738796e-7,0.00016105919,0.000081863436,0.0000567775,0.00006454443,0.00014014784,0.00016404132,0.00005519213,0.0000035864257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001327165,0.000032869666,0.00040775296,0.00044000734,0.0020127837,0.00001627681,0.0004058243,0.83303374,0.0043793265,0.003536388,0.0019326656,0.15378909],"study_design_scores_gemma":[0.0002566935,0.000021375443,0.00022351062,0.00005451988,0.00014115778,0.000005807121,0.0006571981,0.94317234,0.00989387,0.00005943381,0.045314185,0.00019990436],"about_ca_topic_score_codex":0.00008546693,"about_ca_topic_score_gemma":0.000020662143,"teacher_disagreement_score":0.6395402,"about_ca_system_score_codex":0.00014916302,"about_ca_system_score_gemma":0.0000039763436,"threshold_uncertainty_score":0.6567803},"labels":[],"label_agreement":null},{"id":"W4393233726","doi":"10.18280/mmep.110323","title":"Techno-Economic Modeling of Hybrid PV-Hydroelectric Generator Systems in Semarang","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Generator (circuit theory); Environmental science; Automotive engineering; Electrical engineering; Business; Computer science; Engineering; Physics; Power (physics)","score_opus":0.011736903515391604,"score_gpt":0.175523211686721,"score_spread":0.1637863081713294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393233726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20342141,0.0055855936,0.7896453,0.000010788886,0.0002538849,0.00017022605,0.0000028669833,0.00055476424,0.00035511702],"genre_scores_gemma":[0.99279386,0.00043398305,0.0064851884,0.0000011165625,0.00007889398,0.00009504301,0.0000031001787,0.00008497514,0.000023840641],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987839,0.0000075017597,0.0005042269,0.0002456839,0.00012358281,0.0003351246],"domain_scores_gemma":[0.9996422,0.000073042815,0.000013047867,0.0001957549,0.000008819779,0.00006717068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040231782,0.00023100962,0.00034497515,0.00039536413,0.00001628332,0.00008389841,0.0001139647,0.00006456695,0.0000042489246],"category_scores_gemma":[0.000007174177,0.00023105388,0.000052028678,0.00020743927,0.000010931244,0.00011730005,0.000033644006,0.00021702272,0.0000147194005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.927219e-7,0.000008424201,0.0000013364763,0.0031015198,0.00004822709,0.00000825588,0.000094120136,0.98658496,0.0005664704,0.009440111,0.000014560392,0.00013113492],"study_design_scores_gemma":[0.0000908971,0.000013186918,1.4862506e-7,0.00085209287,0.000021835078,0.000022465956,0.00000844281,0.9963064,0.000389558,0.0019178252,0.0001443343,0.00023281558],"about_ca_topic_score_codex":0.000034487908,"about_ca_topic_score_gemma":4.895899e-7,"teacher_disagreement_score":0.78937244,"about_ca_system_score_codex":0.00011426996,"about_ca_system_score_gemma":0.000009013239,"threshold_uncertainty_score":0.9422104},"labels":[],"label_agreement":null},{"id":"W4393681622","doi":"10.1016/j.egyr.2024.03.048","title":"Modelling tools for the assessment of Renewable Energy Communities","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ministry of Science and Technology, Taiwan; Ministero dell’Istruzione, dell’Università e della Ricerca","keywords":"Renewable energy; Environmental economics; Workflow; Energy transition; Process (computing); Energy supply; Energy planning; Environmental impact assessment; Computer science; Environmental resource management; Energy (signal processing); Risk analysis (engineering); Business; Engineering; Economics","score_opus":0.03036272602809191,"score_gpt":0.242858702149083,"score_spread":0.21249597612099108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393681622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014948146,0.0028643417,0.9580208,0.000069168476,0.002163976,0.00006118526,0.000004499781,0.0003689762,0.034952216],"genre_scores_gemma":[0.99153465,0.00087605725,0.003430745,0.000041956973,0.00026433633,0.00026647607,0.000057732002,0.000065282504,0.003462747],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989757,0.00001977081,0.00041722375,0.00014358036,0.00021348176,0.00023026155],"domain_scores_gemma":[0.9988943,0.0003678681,0.000048870046,0.0006120771,0.00004344991,0.000033468157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032539968,0.00016410644,0.00019326717,0.000103885344,0.000090882335,0.0001252419,0.00016226816,0.000055270964,0.000045938592],"category_scores_gemma":[0.0000062286795,0.00012983044,0.0001282828,0.00017444402,0.000035500245,0.00019184394,0.00007486747,0.00006871607,2.144389e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011892218,0.000008646964,0.000014118488,0.00007453723,0.00021417094,0.00003030998,0.000066342036,0.95737886,0.00011269401,0.02706611,0.012315649,0.0027173972],"study_design_scores_gemma":[0.000025474274,0.000013485157,0.000006259252,0.00004826919,0.00003474463,0.00001585961,0.000095406256,0.6127352,0.0021080223,0.0013999719,0.3834251,0.000092196504],"about_ca_topic_score_codex":0.00269265,"about_ca_topic_score_gemma":0.00049650454,"teacher_disagreement_score":0.9900398,"about_ca_system_score_codex":0.00007869698,"about_ca_system_score_gemma":0.00003898311,"threshold_uncertainty_score":0.52943313},"labels":[],"label_agreement":null},{"id":"W4393951502","doi":"10.1016/j.enbuild.2024.114130","title":"Time-series data clustering with load-shape preservation for identifying residential energy consumption behaviors","year":2024,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Science Foundation","keywords":"Cluster analysis; Baseline (sea); Computer science; Energy consumption; Identification (biology); Energy (signal processing); Energy demand; Data mining; Load profile; Demand response; Artificial intelligence; Machine learning; Pattern recognition (psychology); Engineering; Statistics; Mathematics; Environmental economics","score_opus":0.027104423855399563,"score_gpt":0.2524138863066543,"score_spread":0.22530946245125472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393951502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27093196,0.0042804033,0.72033787,0.00024792374,0.0017477871,0.00017595533,0.000056908786,0.0013860717,0.0008351285],"genre_scores_gemma":[0.9809294,0.0015506058,0.010453261,0.00008105962,0.00089071196,0.00019120295,0.0006197342,0.00016414135,0.0051198965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998925,0.0000126255345,0.00020848787,0.00039702267,0.00020913841,0.0002477789],"domain_scores_gemma":[0.99951684,0.00004984512,0.000026762284,0.00031951265,0.000032679825,0.000054373515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019362259,0.00019313209,0.00014584286,0.00013863268,0.00012853173,0.00030140157,0.00022969584,0.00007907106,0.00008374399],"category_scores_gemma":[0.00001209875,0.00018895228,0.00002744111,0.00014467665,0.00005498414,0.0013863414,0.00022802848,0.00005884541,0.0000032471569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006023571,0.00008198379,0.0007624534,0.002738851,0.0014522595,0.00019973304,0.001188757,0.5322119,0.14640337,0.09596255,0.12237144,0.09602435],"study_design_scores_gemma":[0.00037129605,0.00006289276,0.0003118001,0.00033076497,0.00016713547,0.000028264925,0.000036115118,0.63245946,0.013021034,0.00028361505,0.35252532,0.00040232646],"about_ca_topic_score_codex":0.00017352225,"about_ca_topic_score_gemma":0.00053741416,"teacher_disagreement_score":0.7099974,"about_ca_system_score_codex":0.0000710935,"about_ca_system_score_gemma":0.000016630325,"threshold_uncertainty_score":0.77052504},"labels":[],"label_agreement":null},{"id":"W4394564219","doi":"10.1016/j.enpol.2024.114083","title":"Digitalization of power distribution grids: Barrier analysis, ranking and policy recommendations","year":2024,"lang":"en","type":"article","venue":"Energy Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"H2020 Marie Skłodowska-Curie Actions; Horizon 2020; European Commission","keywords":"Electrification; Renewable energy; Software deployment; Smart grid; Decentralization; Environmental economics; Distribution (mathematics); Ranking (information retrieval); Energy policy; Risk analysis (engineering); Electricity; Business; Industrial organization; Process management; Computer science; Engineering; Economics","score_opus":0.004339138536262314,"score_gpt":0.23088392590927456,"score_spread":0.22654478737301226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394564219","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054959748,0.0027671242,0.8714368,0.0039623426,0.001282798,0.00015104748,0.0006440616,0.0014870315,0.06330906],"genre_scores_gemma":[0.99772525,0.00051746005,0.00009180995,0.00007503639,0.0003553162,0.000017379934,0.0006198326,0.000028341317,0.00056954636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992365,0.000022134556,0.00025122947,0.00016973533,0.0001237545,0.00019664322],"domain_scores_gemma":[0.9996405,0.00003894144,0.000023477567,0.00020219928,0.000026295784,0.00006858364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008375771,0.00013714541,0.0001608857,0.00075936737,0.00004597156,0.00008981455,0.00007905644,0.000054990465,0.000057704558],"category_scores_gemma":[0.000049754377,0.00014233023,0.00008834066,0.0019546566,0.00003276704,0.00024687478,0.00005398153,0.000047981895,0.0000036185302],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002328176,0.000013812649,0.00038606933,0.00005367132,0.0009031768,0.0000024091748,0.00024532716,0.26978377,0.00037751094,0.70618224,0.008658108,0.013391572],"study_design_scores_gemma":[0.00022193856,0.000025545112,0.0074509713,0.00007485085,0.00030304346,0.0000043194395,0.000054002205,0.19911544,0.00334499,0.003845188,0.78518915,0.00037059022],"about_ca_topic_score_codex":0.0005817515,"about_ca_topic_score_gemma":0.00007644027,"teacher_disagreement_score":0.94276553,"about_ca_system_score_codex":0.00015219898,"about_ca_system_score_gemma":0.00003469476,"threshold_uncertainty_score":0.58040583},"labels":[],"label_agreement":null},{"id":"W4394863209","doi":"10.1287/msom.2024.0989","title":"Managing Payment Flexibility in Rent-to-Own Contracts for Off-Grid Energy Products","year":2024,"lang":"en","type":"article","venue":"Manufacturing & Service Operations Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; University of Toronto","funders":"","keywords":"Download; Flexibility (engineering); Payment; Grid; Computer science; Business; World Wide Web; Computer security; Database; Internet privacy; Economics","score_opus":0.01307686131187908,"score_gpt":0.23046410798916298,"score_spread":0.2173872466772839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394863209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53055227,0.005476918,0.30171442,0.05466774,0.022665884,0.013179641,0.00021589315,0.007919892,0.063607305],"genre_scores_gemma":[0.9812574,0.0005345465,0.009244144,0.001826912,0.0006684703,0.0025842045,0.00029106287,0.00016793463,0.0034253544],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99737734,0.000040867417,0.000620459,0.0008922219,0.00035598228,0.00071315543],"domain_scores_gemma":[0.99884886,0.00004908465,0.000019140876,0.00088856556,0.000054592387,0.0001397897],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005070373,0.00044663332,0.0003086379,0.0006775114,0.00017129644,0.0005184262,0.0004617708,0.00006491313,0.000084336476],"category_scores_gemma":[0.000009152048,0.00046691985,0.000081719576,0.00061604165,0.000012325956,0.0004479932,0.00031220427,0.00016765448,0.00013467173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017034017,0.00007844917,0.0000051301918,0.0011685265,0.00021236093,0.000044473385,0.00034781106,0.94105893,0.00032613522,0.0053410623,0.006267454,0.04513264],"study_design_scores_gemma":[0.00055517146,0.0000426625,0.0020401273,0.0003511342,0.00010468918,0.0000024256383,0.00026445612,0.40005696,0.019897116,0.00043176181,0.57560927,0.0006442184],"about_ca_topic_score_codex":0.00030027013,"about_ca_topic_score_gemma":0.00209567,"teacher_disagreement_score":0.56934184,"about_ca_system_score_codex":0.0006768552,"about_ca_system_score_gemma":0.000017958966,"threshold_uncertainty_score":0.9997783},"labels":[],"label_agreement":null},{"id":"W4394937365","doi":"10.1109/icicacs60521.2024.10498184","title":"Renewable-Energy-System Applications of Ambiguous-Fuzzy-Hybrid-Averaging Operator","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Operator (biology); Computer science; Fuzzy logic; Artificial intelligence; Engineering; Electrical engineering; Chemistry","score_opus":0.004963512995048115,"score_gpt":0.18573601914346077,"score_spread":0.18077250614841267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394937365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00335694,0.0014387814,0.6548106,0.00006466737,0.000963559,0.0001564337,0.000013970916,0.002328615,0.3368664],"genre_scores_gemma":[0.9904732,0.000073899275,0.0015713784,0.00004002964,0.00027010025,0.00022376135,0.00001954823,0.00006551047,0.0072625913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99908537,0.0000115801295,0.00028653865,0.00022712152,0.00017429565,0.00021507448],"domain_scores_gemma":[0.99946684,0.000023518995,0.000011921208,0.00040058105,0.00002920435,0.00006795249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011062795,0.00015810509,0.00016778783,0.00019274003,0.00003901469,0.00006863012,0.00020207865,0.000033615444,0.000100054],"category_scores_gemma":[0.0000018642573,0.00015391933,0.00006901077,0.00040441644,0.000020256415,0.00013673512,0.00006478773,0.00006271035,0.000085182335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011125439,0.0000116862875,0.00001756101,0.0005863244,0.00017614871,0.000017828186,0.000047743095,0.8690539,0.0022809969,0.045901727,0.073725864,0.008179113],"study_design_scores_gemma":[0.00012243417,0.000010391936,0.000034000215,0.00013606528,0.000046544767,0.000013654011,0.00018583392,0.47098622,0.03871352,0.00019628409,0.48927733,0.0002777173],"about_ca_topic_score_codex":0.0011176945,"about_ca_topic_score_gemma":0.00009080505,"teacher_disagreement_score":0.9871162,"about_ca_system_score_codex":0.0001349402,"about_ca_system_score_gemma":0.000015618412,"threshold_uncertainty_score":0.6276648},"labels":[],"label_agreement":null},{"id":"W4394966972","doi":"10.1109/access.2024.3391298","title":"Maximum Reserved Capacity of Aggregated Electric Water Heaters Virtual Battery for Peak Management","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"National Research Council Canada","keywords":"Demand response; Computer science; News aggregator; Peaking power plant; Payback period; Grid; Model predictive control; Peak demand; Robustness (evolution); Automotive engineering; Control (management); Simulation; Reliability engineering; Electricity; Distributed generation; Engineering; Renewable energy; Electrical engineering","score_opus":0.0259502318880824,"score_gpt":0.24384653539104567,"score_spread":0.21789630350296327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394966972","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9487091,0.000154846,0.04355036,0.00019884283,0.0038798607,0.0004848785,0.000016660459,0.0006102351,0.0023952397],"genre_scores_gemma":[0.9985591,0.000080949314,0.00017435565,0.00007480387,0.00020305523,0.0002002532,0.00003075751,0.00007525124,0.00060148136],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986915,0.000021986834,0.00031627878,0.00030056023,0.00021916324,0.00045052703],"domain_scores_gemma":[0.9994833,0.000041015566,0.000016569471,0.00036803656,0.000033680168,0.000057396963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002257604,0.00021431847,0.00021370868,0.00039465827,0.000040180883,0.0001486666,0.00048702554,0.000063838415,0.00007015061],"category_scores_gemma":[0.0000035812052,0.00017937337,0.00010899169,0.00037257792,0.000022188515,0.0003724125,0.000099314624,0.00011039784,0.000044042794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110182744,0.00008572948,0.00024733023,0.0037475892,0.001676283,0.00012979204,0.00040536598,0.7641934,0.090795256,0.0009903411,0.12503254,0.012586165],"study_design_scores_gemma":[0.00084728625,0.00012389843,0.0020342192,0.00028184705,0.00019986427,0.000005038335,0.000036344154,0.18268608,0.7741669,0.0012632962,0.03774349,0.00061174645],"about_ca_topic_score_codex":0.000058303296,"about_ca_topic_score_gemma":0.000017756072,"teacher_disagreement_score":0.68337166,"about_ca_system_score_codex":0.00013117744,"about_ca_system_score_gemma":0.0000042347556,"threshold_uncertainty_score":0.7314634},"labels":[],"label_agreement":null},{"id":"W4395000085","doi":"10.1186/s42162-024-00334-2","title":"Centralized smart energy monitoring system for legacy home appliances","year":2024,"lang":"en","type":"article","venue":"Energy Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Applied Science Private University","keywords":"Architectural engineering; Computer science; Telecommunications; Embedded system; Business; Engineering","score_opus":0.009147898646612232,"score_gpt":0.2037617667272946,"score_spread":0.19461386808068237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395000085","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009267893,0.0032641594,0.8875347,0.00008893801,0.020379633,0.00022908449,0.00003506075,0.0049729454,0.074227594],"genre_scores_gemma":[0.99064213,0.0005227978,0.0056474656,0.000038079037,0.0011569539,0.0003828419,0.00007446145,0.000080166144,0.0014551008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99848485,0.000009098438,0.00059374643,0.00012306836,0.0002737102,0.0005155368],"domain_scores_gemma":[0.99938744,0.00008342143,0.000043524895,0.00032828088,0.000038433376,0.000118897144],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013956243,0.00029150708,0.0002748117,0.00021924615,0.00009242079,0.00047432102,0.00029195577,0.00010687154,0.000011899567],"category_scores_gemma":[0.000005851906,0.00028296068,0.00013762094,0.0003351854,0.000021975877,0.0009777284,0.00006215911,0.000087169945,0.00003752572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010077533,0.000009694069,0.000031286447,0.002211104,0.00040083178,0.000012853342,0.0006068354,0.7120998,0.00013170844,0.23277129,0.019724503,0.03199003],"study_design_scores_gemma":[0.00021337722,0.000013921776,0.000011472944,0.00019930354,0.00003525544,0.000006577075,0.00068244844,0.39613146,0.0061711394,0.000107052016,0.5961772,0.00025079734],"about_ca_topic_score_codex":0.000042891777,"about_ca_topic_score_gemma":0.000007999139,"teacher_disagreement_score":0.98137426,"about_ca_system_score_codex":0.0002938208,"about_ca_system_score_gemma":0.00002273237,"threshold_uncertainty_score":0.9999623},"labels":[],"label_agreement":null},{"id":"W4395024794","doi":"10.1016/j.buildenv.2024.111548","title":"Occupant counting model development for urban building energy modeling using commercial off-the-shelf Wi-Fi sensing technology","year":2024,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Occupancy; Leverage (statistics); Scalability; Computer science; Building model; Efficient energy use; Energy modeling; Simulation; Engineering; Civil engineering; Machine learning; Database","score_opus":0.02004132057793894,"score_gpt":0.21562424902634056,"score_spread":0.1955829284484016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395024794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.338474,0.0024483164,0.658062,0.00013876994,0.00032595263,0.00017182092,0.000004131147,0.0003293612,0.00004567834],"genre_scores_gemma":[0.8652912,0.00034741146,0.13379002,0.00007480662,0.00027129223,0.00006637897,0.000008367665,0.000110496956,0.00004004235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99818045,0.00001483624,0.00043820197,0.0004980794,0.00024735118,0.00062105386],"domain_scores_gemma":[0.9995207,0.000064845386,0.000037498154,0.00028937784,0.000009736909,0.00007784856],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042041895,0.00036201585,0.00027701032,0.00027818707,0.0004737159,0.00015837909,0.00018808283,0.00014486277,0.0000026831835],"category_scores_gemma":[0.000010130579,0.00034040996,0.000075978765,0.00016075652,0.000067084315,0.00013847985,0.0002652097,0.00020971014,0.0000019790164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053254607,0.000008570322,0.000045490626,0.00010075797,0.000121308134,0.0000066208872,0.00023784899,0.92806184,0.012198117,0.0030697144,0.00021306095,0.055931337],"study_design_scores_gemma":[0.00018540956,0.000011197075,0.000007689335,0.0002186075,0.00008209005,0.000019167494,0.00009895203,0.94428885,0.0054930435,0.00064662116,0.04855589,0.0003924839],"about_ca_topic_score_codex":0.000024012774,"about_ca_topic_score_gemma":0.000005072984,"teacher_disagreement_score":0.5268172,"about_ca_system_score_codex":0.0004770549,"about_ca_system_score_gemma":0.000024903211,"threshold_uncertainty_score":0.9999048},"labels":[],"label_agreement":null},{"id":"W4396214014","doi":"10.2316/j.2023.203-0473","title":"AN EVALUATION METHOD WITH MULTI-TECHNICAL INDICATORS FOR CAPACITY CONFIGURATION SCHEME OF THE ENERGY STORAGE SYSTEM AT USER SIDE BASING ON GAME TOPSIS, 1-7.","year":2023,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheme (mathematics); TOPSIS; Computer science; Energy storage; Reliability engineering; Energy (signal processing); Operations research; Engineering; Mathematics; Statistics","score_opus":0.020741740586345994,"score_gpt":0.273149640309087,"score_spread":0.252407899722741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396214014","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5979709,0.0001959046,0.3968487,0.00009681771,0.003800688,0.00013626601,0.000028052977,0.000072669165,0.00085002236],"genre_scores_gemma":[0.998528,0.00002159773,0.0009956548,0.000022361732,0.00024417453,0.000034336965,0.000015956739,0.000027995271,0.000109896304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983073,0.00016397305,0.00050092186,0.00014485391,0.00074973033,0.00013322475],"domain_scores_gemma":[0.9989719,0.0001267363,0.00031815952,0.00017660091,0.00033831992,0.00006832602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095398154,0.00014499652,0.00022788958,0.00035430884,0.000049566323,0.000055106968,0.0002634722,0.00008394312,0.000006482316],"category_scores_gemma":[0.000044483862,0.000102357735,0.00008646556,0.00018309009,0.000030915617,0.00018633244,0.00003022135,0.00007957243,5.338984e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011937605,0.00003682922,0.0006374723,0.000046835095,0.00039327244,0.000008097013,0.00023463737,0.9676136,0.01707587,0.0121867,0.00043499187,0.0012123383],"study_design_scores_gemma":[0.002032242,0.00029298465,0.015992336,0.00065097364,0.000117383555,0.0001765149,0.0006085448,0.9342141,0.02393546,0.000022014387,0.021688413,0.0002690308],"about_ca_topic_score_codex":0.00007347651,"about_ca_topic_score_gemma":0.00006589081,"teacher_disagreement_score":0.40055716,"about_ca_system_score_codex":0.00043220285,"about_ca_system_score_gemma":0.000034925786,"threshold_uncertainty_score":0.4174027},"labels":[],"label_agreement":null},{"id":"W4396693934","doi":"10.3390/fi16050162","title":"BPET: A Unified Blockchain-Based Framework for Peer-to-Peer Energy Trading","year":2024,"lang":"en","type":"article","venue":"Future Internet","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"York University; University of Alberta","funders":"","keywords":"Blockchain; Computer science; Peer-to-peer; Distributed computing; Modular design; Energy market; Renewable energy; Smart contract; Energy (signal processing); Computer security; Operating system","score_opus":0.01035312953159516,"score_gpt":0.23291623171313258,"score_spread":0.2225631021815374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396693934","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024741821,0.00081634946,0.93658996,0.009334498,0.017495828,0.00030128838,0.00006552901,0.0020178875,0.008636833],"genre_scores_gemma":[0.9670547,0.0000028362847,0.015824977,0.0011114796,0.004866857,0.0002402835,0.000060636477,0.00015140795,0.010686787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986641,0.000014317573,0.00023984013,0.00035110782,0.00033039137,0.0004002801],"domain_scores_gemma":[0.9993101,0.0001527457,0.00001372139,0.0003251775,0.000063743566,0.00013451057],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019377752,0.0002798498,0.00020724689,0.0002782566,0.00002572591,0.00015624396,0.00032855902,0.00017532344,0.00031607415],"category_scores_gemma":[0.0000527049,0.00027255557,0.00015636736,0.0003326699,0.000012174674,0.000023034858,0.00003890457,0.00023581563,0.00007270529],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035615856,0.000019574587,0.000009806258,0.00023115282,0.00029089497,0.000060793718,0.00091688184,0.22358659,0.00035320604,0.17374282,0.5912557,0.009496939],"study_design_scores_gemma":[0.00010742833,0.00004477025,0.00001584637,0.00014270381,0.000026549378,0.0000020946532,0.00006169721,0.3739803,0.0036693478,0.000954266,0.6207833,0.00021167989],"about_ca_topic_score_codex":0.00003034399,"about_ca_topic_score_gemma":0.00007034213,"teacher_disagreement_score":0.9423129,"about_ca_system_score_codex":0.00017167565,"about_ca_system_score_gemma":0.00001558534,"threshold_uncertainty_score":0.99997264},"labels":[],"label_agreement":null},{"id":"W4396697506","doi":"10.1051/e3sconf/202452305002","title":"Mixed-use neighbourhood to maximise urban energy community potential","year":2024,"lang":"en","type":"article","venue":"E3S Web of Conferences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Neighbourhood (mathematics); Geography; Environmental planning; Environmental science; Economic geography; Mathematics","score_opus":0.023358696998445568,"score_gpt":0.20881990168361572,"score_spread":0.18546120468517016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396697506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7697818,0.0009602474,0.038026586,0.00055649027,0.0059289504,0.00018152535,0.00006399431,0.001341177,0.18315919],"genre_scores_gemma":[0.99822223,0.00011772788,0.0003554419,0.00005942756,0.00018954305,0.000022624776,0.000021257574,0.000029821105,0.000981918],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990432,0.00007326613,0.00025456856,0.0001482687,0.00023314665,0.00024754007],"domain_scores_gemma":[0.9993521,0.000093234135,0.000017893624,0.00037981838,0.00004556146,0.00011137927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015904455,0.00018780689,0.0002132675,0.00023077206,0.000056511693,0.00016263628,0.0003924831,0.00006581743,0.00043943245],"category_scores_gemma":[0.000024016625,0.00018113521,0.000081995844,0.0002665915,0.000047427835,0.00018269583,0.00013973328,0.00018708492,0.00004834804],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004108647,0.00016956832,0.0024599386,0.000513358,0.00087458553,0.000095148534,0.0010324572,0.18104668,0.008743807,0.60844606,0.1251987,0.07137858],"study_design_scores_gemma":[0.0004925584,0.0002919903,0.028193098,0.0004334208,0.00016284225,0.000009566047,0.00082244835,0.21231255,0.026292818,0.0031484056,0.726927,0.00091330643],"about_ca_topic_score_codex":0.0008230844,"about_ca_topic_score_gemma":0.00056271063,"teacher_disagreement_score":0.6052977,"about_ca_system_score_codex":0.00002865611,"about_ca_system_score_gemma":0.000101976104,"threshold_uncertainty_score":0.738648},"labels":[],"label_agreement":null},{"id":"W4396813774","doi":"10.1080/19401493.2024.2418813","title":"CityLearn v2: energy-flexible, resilient, occupant-centric, and carbon-aware management of grid-interactive communities","year":2024,"lang":"en","type":"preprint","venue":"Journal of Building Performance Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada; U.S. Department of Energy","keywords":"Computer science; Reinforcement learning; Grid; Flexibility (engineering); Distributed computing; Benchmarking; Energy management; Energy storage; Energy (signal processing); Power (physics); Artificial intelligence","score_opus":0.015183408863508054,"score_gpt":0.25912292762582145,"score_spread":0.2439395187623134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396813774","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97889084,0.002265066,0.01279874,0.000030198811,0.0036659923,0.00016928343,0.000015178498,0.00012401353,0.0020406838],"genre_scores_gemma":[0.9937846,0.0041830293,0.0013916107,0.0000109826515,0.00044067955,0.000007707839,0.000017033779,0.00006745538,0.00009686569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980782,0.000058795806,0.0008965878,0.00018133804,0.0005291218,0.00025592832],"domain_scores_gemma":[0.99872184,0.00012191573,0.0004994265,0.00036931713,0.00021190393,0.00007560947],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004530296,0.00035526688,0.0005242618,0.00093073153,0.00006689554,0.000106278174,0.00034970714,0.00016526757,0.000011433396],"category_scores_gemma":[0.000007244954,0.0003536614,0.00015760696,0.00027583746,0.000050528673,0.00023608365,0.00075904175,0.00086189085,8.2311385e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010017355,0.000028344877,0.0022121626,0.002454431,0.00068471476,0.000018519224,0.0005142771,0.9882732,0.000040317453,0.00019218348,0.0002045133,0.0052771503],"study_design_scores_gemma":[0.000435394,0.00008658468,0.0053941826,0.0038237283,0.00033224208,0.000012298459,0.00049226277,0.98619026,0.0013066194,0.00035748607,0.0012641862,0.0003047596],"about_ca_topic_score_codex":0.000059744896,"about_ca_topic_score_gemma":0.000006461927,"teacher_disagreement_score":0.014893792,"about_ca_system_score_codex":0.0003929934,"about_ca_system_score_gemma":0.000030978536,"threshold_uncertainty_score":0.9998915},"labels":[],"label_agreement":null},{"id":"W4396915180","doi":"10.2139/ssrn.4829677","title":"Deep Reinforcement Learning for Economic Battery Dispatch: A Comprehensive Comparison of Algorithms and Experiment Design Choices","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Economic dispatch; Computer science; Battery (electricity); Artificial intelligence; Machine learning; Reinforcement; Psychology; Power (physics); Social psychology; Electric power system","score_opus":0.022419806225838015,"score_gpt":0.2689997521670136,"score_spread":0.2465799459411756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396915180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043074317,0.036324684,0.91742533,0.00009310347,0.0020328064,0.00068979297,0.0000020340337,0.0001441029,0.00021382039],"genre_scores_gemma":[0.9870618,0.008959136,0.0027238687,0.000012056096,0.00065288553,0.00020495112,0.00003243244,0.00012174034,0.00023110339],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99722344,0.00006185272,0.00073929183,0.0003684155,0.00020740664,0.0013996168],"domain_scores_gemma":[0.9992438,0.0001314673,0.00025772373,0.00023354546,0.000041178995,0.00009229726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005937787,0.00044071753,0.00065039156,0.00028798392,0.000104593084,0.00014115465,0.00031202385,0.00016483416,0.000019537983],"category_scores_gemma":[0.000006791492,0.00045195365,0.00020711723,0.000038863578,0.00004377649,0.00007029898,0.00042903473,0.0022588929,0.000009916059],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036289337,0.000015277174,0.000083234685,0.0003828079,0.0014299373,0.0000014433244,0.0005741796,0.9873437,0.00021303757,0.0025037457,0.000252175,0.0071641477],"study_design_scores_gemma":[0.0005740293,0.00037525696,0.00004309142,0.00022285292,0.00024082467,0.000023728915,0.0016255985,0.98194104,0.0017850889,0.010566569,0.0021682698,0.00043366553],"about_ca_topic_score_codex":0.00006177648,"about_ca_topic_score_gemma":0.00008562861,"teacher_disagreement_score":0.9439875,"about_ca_system_score_codex":0.0019188166,"about_ca_system_score_gemma":0.00033613594,"threshold_uncertainty_score":0.99979323},"labels":[],"label_agreement":null},{"id":"W4398518877","doi":"10.7910/dvn/fie0s4/gf34zp","title":"Metering_S130hot.pdf","year":2016,"lang":"en","type":"dataset","venue":"Harvard Dataverse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Metering mode; Environmental science; Physics; Optics","score_opus":0.00934221406406491,"score_gpt":0.19715113558468805,"score_spread":0.18780892152062315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398518877","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000005764672,0.0000016504981,0.0005993992,0.000002131218,0.004189428,0.00014166244,0.991785,0.0003975599,0.0028774189],"genre_scores_gemma":[0.0000039523147,0.0008337882,0.00023761815,0.000117075484,0.00077953574,0.000060867183,0.9961957,0.00006715538,0.0017043545],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984894,0.000027129034,0.00030529033,0.0003971993,0.0003200497,0.00046095782],"domain_scores_gemma":[0.9978681,0.000045692734,0.00005481417,0.001872508,0.000019522182,0.00013936053],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00014474028,0.00043926484,0.00035680222,0.00025701412,0.000046614397,0.00008182471,0.0008630204,0.00023148501,0.07917793],"category_scores_gemma":[0.000041481144,0.00039791767,0.0001151149,0.00011510349,0.00004667519,0.00023073245,0.00044051645,0.0002545501,0.5192716],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004533001,0.000011753995,4.7843054e-7,0.00019669453,0.00021721945,0.0001353625,0.000001754142,0.0010804414,0.00003475579,0.0000147939445,0.9979535,0.0003487624],"study_design_scores_gemma":[0.0002619997,0.000015587791,0.000009852852,0.00011960112,0.0001186741,0.000008981554,0.0000028007366,0.00014129061,0.00006970375,0.000009846376,0.9987437,0.00049793645],"about_ca_topic_score_codex":0.00005807836,"about_ca_topic_score_gemma":0.00004776517,"teacher_disagreement_score":0.44009367,"about_ca_system_score_codex":0.00019105089,"about_ca_system_score_gemma":0.000017411487,"threshold_uncertainty_score":0.9998473},"labels":[],"label_agreement":null},{"id":"W4398678094","doi":"10.7910/dvn/fie0s4/wjilsc","title":"Metering_DENTps18.pdf","year":2016,"lang":"en","type":"dataset","venue":"Harvard Dataverse","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Metering mode; Computer science; Environmental science; Geography; Engineering; Mechanical engineering","score_opus":0.009465101456237145,"score_gpt":0.19831388395094013,"score_spread":0.188848782494703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398678094","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000005261542,0.0000021076014,0.0006644573,0.0000019400532,0.0049456586,0.0001442051,0.9915802,0.00037438734,0.0022818127],"genre_scores_gemma":[0.0000037284976,0.0010576992,0.00018367317,0.00011140949,0.0008304629,0.0000604943,0.9958218,0.00006482598,0.0018659068],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984698,0.000027496251,0.0003087187,0.00039546622,0.000347859,0.00045062587],"domain_scores_gemma":[0.997879,0.000042958007,0.000055882672,0.0018592583,0.000019308367,0.00014354438],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00014499556,0.00042768326,0.00034757008,0.0002656782,0.000045624598,0.000088894216,0.0008820294,0.00022162672,0.08165593],"category_scores_gemma":[0.000041914995,0.00039114858,0.00011731691,0.00011424049,0.00004544033,0.00023273575,0.00049897993,0.00024633,0.58682543],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046437835,0.000011897085,7.42598e-7,0.00019060507,0.00023088184,0.00015594883,0.0000015777958,0.0008903339,0.000029631536,0.000012002967,0.99817365,0.00029810588],"study_design_scores_gemma":[0.00027344807,0.000014322698,0.000011917272,0.00012246204,0.00012930481,0.000009398144,0.0000027859717,0.00013175841,0.000060478742,0.000008668555,0.99875355,0.00048192614],"about_ca_topic_score_codex":0.000048836115,"about_ca_topic_score_gemma":0.000043907778,"teacher_disagreement_score":0.5051695,"about_ca_system_score_codex":0.00019900406,"about_ca_system_score_gemma":0.000015678072,"threshold_uncertainty_score":0.999854},"labels":[],"label_agreement":null},{"id":"W4399247501","doi":"10.21203/rs.3.rs-4443849/v1","title":"Sinoatrial Node Cells Implementation by Low Cost Digital Hardware","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Sinoatrial node; Computer hardware; Node (physics); Computer science; Business; Engineering; Internal medicine; Medicine","score_opus":0.0317755841041335,"score_gpt":0.35098579443996364,"score_spread":0.31921021033583014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399247501","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6275585,0.01470593,0.03083536,0.005123895,0.051575083,0.02445279,0.042516127,0.012057075,0.19117524],"genre_scores_gemma":[0.98994994,0.0006200582,0.00014301208,0.000015658796,0.0020035473,0.0008550078,0.0041024084,0.00026233384,0.0020480354],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99642724,0.000102736645,0.00044379913,0.00069314596,0.0014126893,0.0009204029],"domain_scores_gemma":[0.99862105,0.00014815337,0.000032050048,0.00078114367,0.000188531,0.00022908917],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00063994096,0.0003990008,0.0003251933,0.00053808483,0.00010717134,0.0012189177,0.00060802023,0.00028014582,0.0005931977],"category_scores_gemma":[0.000044362663,0.00042891214,0.00021632042,0.00044503523,0.000065751956,0.00014712424,0.0020915787,0.0016492652,0.0015453924],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023983312,0.00004661803,0.00018484019,0.003643373,0.00030028415,0.00010317529,0.00022365605,0.20018683,0.0010878862,0.0002207758,0.7742069,0.019771686],"study_design_scores_gemma":[0.0014065125,0.000119827695,0.0003929904,0.0014301894,0.000084408246,0.0000022814215,0.0011157496,0.07383511,0.029624684,0.0018641634,0.88865566,0.0014684108],"about_ca_topic_score_codex":0.00016752389,"about_ca_topic_score_gemma":0.00004649995,"teacher_disagreement_score":0.36239144,"about_ca_system_score_codex":0.0010421078,"about_ca_system_score_gemma":0.00014153711,"threshold_uncertainty_score":0.9998179},"labels":[],"label_agreement":null},{"id":"W4399259911","doi":"10.1007/s12652-024-04814-x","title":"Non intrusive load monitoring using additive time series modeling via finite mixture models aggregation","year":2024,"lang":"en","type":"article","venue":"Journal of Ambient Intelligence and Humanized Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Series (stratigraphy); Computer science; Time series; Biological system; Machine learning; Geology","score_opus":0.02276864922019724,"score_gpt":0.24265709068974078,"score_spread":0.21988844146954353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399259911","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32429555,0.0016888168,0.67245287,0.000013018579,0.0012139084,0.00007222857,0.0000012314086,0.00008105492,0.00018129281],"genre_scores_gemma":[0.9869447,0.0006193838,0.011256699,0.000013324758,0.0010883093,0.0000010539735,0.0000020944387,0.000042599582,0.000031831933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985667,0.000021997723,0.0006042618,0.0001904902,0.00035182605,0.00026474387],"domain_scores_gemma":[0.99933654,0.00008929999,0.00012477269,0.00010530185,0.00026494404,0.00007912361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038581647,0.00022907418,0.0002929858,0.00030202363,0.00016522632,0.00027179616,0.00016595089,0.00007377812,0.000018751334],"category_scores_gemma":[0.000021425934,0.00022239424,0.00010656183,0.00024348633,0.000030441877,0.00080162036,0.000101030935,0.00039317782,0.000009672944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018295332,0.000008645823,0.000007418732,0.00009257415,0.00015036944,0.00006415312,0.0034075368,0.9711038,0.0025111649,0.00025590096,0.000031727446,0.022348408],"study_design_scores_gemma":[0.000079352634,0.000076564276,0.0000046966343,0.001417164,0.00007665158,0.00008383517,0.0005992843,0.9819378,0.012734722,0.0026628827,0.00011488224,0.00021214686],"about_ca_topic_score_codex":0.000014644566,"about_ca_topic_score_gemma":0.0000013927852,"teacher_disagreement_score":0.66264915,"about_ca_system_score_codex":0.00029944553,"about_ca_system_score_gemma":0.000035965182,"threshold_uncertainty_score":0.9068974},"labels":[],"label_agreement":null},{"id":"W4399292696","doi":"10.3390/en17112705","title":"Self-Scheduling Virtual Power Plant for Peak Management","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Power management; Virtual power plant; Computer science; Environmental science; Power (physics); Electrical engineering; Engineering; Renewable energy; Physics; Distributed generation","score_opus":0.005192502602889111,"score_gpt":0.19121935819470312,"score_spread":0.186026855591814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399292696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40068588,0.011754527,0.1926813,0.0007381568,0.028176164,0.0011929901,0.000121540244,0.018216748,0.3464327],"genre_scores_gemma":[0.9755115,0.0005776515,0.019471064,0.00007249901,0.00049506035,0.00025946065,0.00004986159,0.00010678623,0.0034561194],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917287,0.000006160721,0.00016322151,0.00021968753,0.00015037759,0.00028766782],"domain_scores_gemma":[0.9996762,0.0000535555,0.000007171713,0.00021220821,0.00000864441,0.000042164753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011575431,0.0001765859,0.000119444754,0.00016676626,0.000048733324,0.00012096083,0.00016072934,0.000042385636,0.000049150913],"category_scores_gemma":[0.0000031502088,0.00017136033,0.00008251846,0.00014021425,0.000010725659,0.0001290508,0.00007789567,0.00006876217,0.000086087966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037662642,0.000008898219,0.000002597687,0.00025147366,0.00031314007,0.000038207938,0.0002616119,0.7839063,0.00013466127,0.18960282,0.023428023,0.0020484903],"study_design_scores_gemma":[0.0001377811,0.000025950825,0.000064824664,0.00005947267,0.000047319325,0.0000025313955,0.00033940203,0.2258188,0.001290652,0.00022320394,0.7717758,0.00021426025],"about_ca_topic_score_codex":0.0000021402593,"about_ca_topic_score_gemma":0.0000043952627,"teacher_disagreement_score":0.74834776,"about_ca_system_score_codex":0.00008573318,"about_ca_system_score_gemma":0.000004943388,"threshold_uncertainty_score":0.6987871},"labels":[],"label_agreement":null},{"id":"W4399330307","doi":"10.1109/mele.2024.3385949","title":"Enhancing Distributed Energy Resource Integration and Supply Reliability: The Two-to-One rule","year":2024,"lang":"en","type":"article","venue":"IEEE Electrification Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Resource (disambiguation); Computer science; Distributed computing; Mathematical optimization; Engineering; Mathematics; Computer network; Physics","score_opus":0.006788984742883928,"score_gpt":0.20935961745848417,"score_spread":0.20257063271560025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399330307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04471058,0.001098925,0.9455787,0.0035209707,0.00061720767,0.00029915766,0.000023691586,0.0010366032,0.003114149],"genre_scores_gemma":[0.996884,0.00022914722,0.0009478385,0.00017084043,0.00041001406,0.00016993616,0.00017799252,0.000048018246,0.0009622451],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988679,0.000057227782,0.00029615068,0.00031928692,0.000202606,0.0002567957],"domain_scores_gemma":[0.999294,0.00014309557,0.000021099979,0.00041674965,0.000052321386,0.00007273049],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004098561,0.00016967025,0.00012993105,0.00016350983,0.000088032706,0.00016639392,0.00016040035,0.000051803847,0.000024430465],"category_scores_gemma":[0.00006879136,0.00014363318,0.000035337856,0.000833855,0.000027921113,0.00013592812,0.000012596728,0.00017947424,0.00011854165],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019755118,0.000024124729,0.000022052242,0.00007007426,0.00006619521,0.0000029130872,0.00025728438,0.08637165,0.79263616,0.011323463,0.04434233,0.064863995],"study_design_scores_gemma":[0.00016724304,0.000042738764,0.0016854292,0.00007115873,0.00005393296,0.000006716258,0.000026239666,0.21032366,0.36764625,0.0012040802,0.41851395,0.00025859123],"about_ca_topic_score_codex":0.000025007223,"about_ca_topic_score_gemma":0.00009432105,"teacher_disagreement_score":0.9521734,"about_ca_system_score_codex":0.00018251018,"about_ca_system_score_gemma":0.000016133736,"threshold_uncertainty_score":0.5857191},"labels":[],"label_agreement":null},{"id":"W4399331545","doi":"10.21203/rs.3.rs-4327177/v1","title":"Probabilistic deployment pathways of scaling up distributed green hydrogen systems for urban residential communities in North America","year":2024,"lang":"en","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Software deployment; Probabilistic logic; Scaling; Geography; Environmental science; Computer science; Mathematics; Artificial intelligence","score_opus":0.05944795207026895,"score_gpt":0.3031940740550446,"score_spread":0.24374612198477566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399331545","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9803553,0.00790302,0.002270271,0.00007861673,0.0013084039,0.004005148,0.003192187,0.0005491964,0.0003378197],"genre_scores_gemma":[0.9934906,0.00059066946,0.0000649955,0.000001593892,0.00033561117,0.0027817367,0.002484822,0.00015007715,0.00009993411],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964546,0.00041759037,0.0008173457,0.0004361079,0.0010393518,0.0008349861],"domain_scores_gemma":[0.9978211,0.0005064894,0.000079747864,0.0011345919,0.00031839148,0.00013968378],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012279206,0.00037306536,0.000642812,0.0008612929,0.000104297505,0.00016972331,0.0009009335,0.0002121767,0.000013719147],"category_scores_gemma":[0.0001487266,0.0003928049,0.00018867,0.0007566327,0.00018006613,0.00004765056,0.0021477921,0.0012825762,0.00001849577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000474228,0.000060713013,0.001170721,0.021357939,0.0002989084,0.000035057852,0.002545733,0.9693486,0.000025720981,0.0006062314,0.003914289,0.00058867485],"study_design_scores_gemma":[0.0005622611,0.00015812194,0.00228034,0.004545342,0.000096838005,0.000001752502,0.004236355,0.9738683,0.00029236008,0.0016750533,0.011653395,0.0006298726],"about_ca_topic_score_codex":0.010122025,"about_ca_topic_score_gemma":0.0032512867,"teacher_disagreement_score":0.016812596,"about_ca_system_score_codex":0.0010962758,"about_ca_system_score_gemma":0.00017616067,"threshold_uncertainty_score":0.99985236},"labels":[],"label_agreement":null},{"id":"W4399461022","doi":"10.1016/j.automatica.2024.111758","title":"Online dynamic submodular optimization","year":2024,"lang":"en","type":"article","venue":"Automatica","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Valorisation des Données","keywords":"Submodular set function; Mathematical optimization; Computer science; Mathematics","score_opus":0.004172722539743211,"score_gpt":0.20440403039712743,"score_spread":0.20023130785738422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399461022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056256566,0.0010631325,0.9214372,0.0006034709,0.001931098,0.0001639066,0.000010907013,0.0062941993,0.012239533],"genre_scores_gemma":[0.96301657,0.00010716466,0.036039896,0.000045748464,0.00008726769,0.000020145491,0.00008071914,0.000057778856,0.0005447246],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995206,0.000006809257,0.00012917057,0.00010351213,0.00010382985,0.00013607225],"domain_scores_gemma":[0.9997574,0.000020879417,0.000004186692,0.00018057428,0.00000669674,0.000030239276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048742517,0.000089186025,0.00007455069,0.00009712523,0.000015972677,0.00005431545,0.00008240766,0.000031710533,0.00023253463],"category_scores_gemma":[0.000008480228,0.000088137844,0.000030181442,0.00020838752,0.000009631011,0.00009934767,0.000022627952,0.000057997353,0.0002215702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.238169e-7,0.000009500867,0.000002407228,0.00012487518,0.000045369787,0.000014992433,0.000041900697,0.9907838,0.00008846412,0.0012621456,0.0030033987,0.00462301],"study_design_scores_gemma":[0.00003869364,0.0000060042403,0.0004910405,0.000048547856,0.000020547268,0.0000031544419,0.000009969445,0.98922086,0.000059387818,0.00018250002,0.009821173,0.00009813088],"about_ca_topic_score_codex":0.0000017843204,"about_ca_topic_score_gemma":0.0000037062716,"teacher_disagreement_score":0.90676,"about_ca_system_score_codex":0.0000730355,"about_ca_system_score_gemma":0.0000051495745,"threshold_uncertainty_score":0.3594157},"labels":[],"label_agreement":null},{"id":"W4399526436","doi":"10.1109/access.2024.3412822","title":"A Distributed-Decentralized Tri-Layer Game-Based Transactive Energy Framework Including Adaptive Proximal ADMM and Scale- Independent DRO","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"Huawei Technologies","keywords":"Computer science; Transactive memory; Distributed computing; Layer (electronics); Scale (ratio); Physics; Knowledge management","score_opus":0.02987038551507187,"score_gpt":0.2764011843018137,"score_spread":0.24653079878674183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399526436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1729512,0.0013194334,0.8220174,0.00019837775,0.0016910147,0.0003024563,0.0000949769,0.00085117936,0.0005739929],"genre_scores_gemma":[0.9981409,0.00020455086,0.00081345317,0.00013235411,0.00027432304,0.00026513482,0.000030501838,0.00010146616,0.000037324688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980361,0.000064494794,0.00035105005,0.0005479733,0.0004272998,0.0005731013],"domain_scores_gemma":[0.9992028,0.0002090195,0.000037469476,0.00030332184,0.000046030178,0.00020139873],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016892693,0.0003979989,0.00036712954,0.00026952382,0.00008763703,0.00043488445,0.00040191752,0.0002227353,0.00010681424],"category_scores_gemma":[0.000015656693,0.00039197103,0.00012525407,0.000672239,0.00006846153,0.0006112635,0.000074012074,0.0004271148,0.000010210045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056528894,0.00021121169,0.0011921222,0.00064786646,0.0012948052,0.0004867157,0.0011904585,0.9524606,0.0033152273,0.0053293994,0.003698127,0.029608198],"study_design_scores_gemma":[0.0018183158,0.00012372254,0.0030719554,0.00080101925,0.00030607486,0.000014172105,0.00013948635,0.85690904,0.11533605,0.0027956713,0.017573738,0.0011107414],"about_ca_topic_score_codex":0.000110727546,"about_ca_topic_score_gemma":0.00009744232,"teacher_disagreement_score":0.82518965,"about_ca_system_score_codex":0.00034620482,"about_ca_system_score_gemma":0.000049828788,"threshold_uncertainty_score":0.9998532},"labels":[],"label_agreement":null},{"id":"W4399765813","doi":"10.1016/j.apenergy.2024.123543","title":"Designing aggregation criteria for end-users integration in energy communities: Energy and economic optimisation based on hybrid neural networks models","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministero dell'Istruzione e del Merito; Ministero dell’Istruzione, dell’Università e della Ricerca","keywords":"Artificial neural network; Energy (signal processing); Computer science; Artificial intelligence; Mathematics","score_opus":0.01743678678789761,"score_gpt":0.2110195291292245,"score_spread":0.19358274234132689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399765813","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010166965,0.000291563,0.98478097,0.00006044652,0.000733945,0.000094810144,0.000009476365,0.00040302522,0.0034587954],"genre_scores_gemma":[0.9944439,0.0003678623,0.0030829678,0.00033717387,0.00028929097,0.0006739905,0.0006599124,0.00010705924,0.00003783885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998864,0.00004981156,0.00036001203,0.00029698326,0.00010370794,0.00032547183],"domain_scores_gemma":[0.99933237,0.00027622478,0.000039034763,0.00027515859,0.000013743083,0.00006345753],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019065881,0.00030467354,0.00023065301,0.0004256491,0.000084847125,0.00019561716,0.0001496939,0.00010657987,0.0000235335],"category_scores_gemma":[0.0000022028466,0.00034708763,0.000056093304,0.00013836814,0.000036023706,0.0002900812,0.000035695244,0.00009640171,5.091778e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000411706,0.0000098787605,0.0000010662962,0.000024713885,0.000026339429,0.0000021374515,0.00010253132,0.8423865,0.00033407527,0.09116027,0.000888824,0.06502251],"study_design_scores_gemma":[0.00044112155,0.00005323462,0.000004228138,0.00008605096,0.000021877619,0.0000014706995,0.00013575374,0.981965,0.009848194,0.0032867487,0.0038354825,0.000320831],"about_ca_topic_score_codex":0.0008945327,"about_ca_topic_score_gemma":0.0010800102,"teacher_disagreement_score":0.98427695,"about_ca_system_score_codex":0.00035549226,"about_ca_system_score_gemma":0.000017138611,"threshold_uncertainty_score":0.99989814},"labels":[],"label_agreement":null},{"id":"W4399879138","doi":"10.1016/j.apenergy.2024.123736","title":"Lévy arithmetic optimization for energy Management of Solar Wind Microgrid with multiple diesel generators for off-grid communities","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Saint Mary's University","funders":"","keywords":"Microgrid; Diesel fuel; Wind power; Renewable energy; Grid; Energy management; Diesel generator; Arithmetic; Computer science; Environmental science; Mathematics; Automotive engineering; Mathematical optimization; Energy (signal processing); Electrical engineering; Engineering; Statistics","score_opus":0.007825332304657685,"score_gpt":0.18243136049392258,"score_spread":0.1746060281892649,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399879138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005330102,0.003114611,0.98731357,0.000041296207,0.0009230363,0.0004017704,0.00010187931,0.00052956986,0.0022441735],"genre_scores_gemma":[0.858169,0.0037200172,0.13386928,0.00012140339,0.00052299444,0.0018722108,0.0010712002,0.0002860551,0.0003678122],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870783,0.000013502678,0.0003753784,0.0002848799,0.00019759797,0.000420804],"domain_scores_gemma":[0.99923503,0.00014456012,0.000048827693,0.0004434683,0.00006070218,0.00006742552],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013073182,0.00034699606,0.0003303202,0.00026294458,0.00012226363,0.00008702646,0.0002885766,0.00009699169,0.000020067877],"category_scores_gemma":[0.000001414478,0.00033515392,0.00010943794,0.0003177501,0.00007253207,0.00010124151,0.00009720935,0.00006370635,0.000001135183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056575358,0.00004871267,0.000005959995,0.00065256114,0.0008020323,0.0000029062692,0.00011221297,0.9080137,0.00044709668,0.05623004,0.0037456977,0.029882483],"study_design_scores_gemma":[0.00086396566,0.000095150855,0.000011495415,0.00010205685,0.00019660567,0.0000016074223,0.00035687254,0.6748241,0.03283085,0.0002090895,0.29012945,0.00037871304],"about_ca_topic_score_codex":0.000101145,"about_ca_topic_score_gemma":0.00017916874,"teacher_disagreement_score":0.8534443,"about_ca_system_score_codex":0.00010964932,"about_ca_system_score_gemma":0.0000150569895,"threshold_uncertainty_score":0.99991006},"labels":[],"label_agreement":null},{"id":"W4399923960","doi":"10.1109/icnc59896.2024.10556254","title":"Synthetic Power Consumption Data Generation For Appliance Operation Modes","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Power consumption; Computer science; Consumption (sociology); Power (physics); Embedded system","score_opus":0.07986225791301788,"score_gpt":0.28220415472358484,"score_spread":0.20234189681056697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399923960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01105185,0.00062710093,0.9828564,0.00013639861,0.0009411764,0.00024322807,0.000025494319,0.0005877121,0.0035306246],"genre_scores_gemma":[0.9891288,0.00011914592,0.009294908,0.000040917883,0.00022549082,0.00011784297,0.00031836238,0.00002691763,0.00072759046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951315,0.000004508509,0.00010425831,0.00021426818,0.00006803809,0.00009574872],"domain_scores_gemma":[0.9996102,0.000018637733,0.0000033016127,0.00034142812,0.000009167236,0.0000172765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012622637,0.00007494448,0.000050352246,0.000043434036,0.00003059556,0.00012283496,0.00010797685,0.000028758399,0.00014796008],"category_scores_gemma":[0.0000060873563,0.00007119226,0.000013203344,0.000040010957,0.0000070826854,0.00030607337,0.000031194628,0.00002801194,0.00017415376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013677335,0.0000054032557,0.000006634549,0.00012265352,0.000040503004,7.3402634e-7,0.000023676128,0.8665036,0.03027447,0.035775244,0.060422115,0.006823598],"study_design_scores_gemma":[0.00004873672,0.000005272514,0.000016951484,0.000013127962,0.00001410496,8.553386e-7,0.0000062636004,0.9317864,0.007570554,0.00005460054,0.060396347,0.00008677511],"about_ca_topic_score_codex":0.0000028285988,"about_ca_topic_score_gemma":0.000022099564,"teacher_disagreement_score":0.978077,"about_ca_system_score_codex":0.000042392283,"about_ca_system_score_gemma":0.0000043953974,"threshold_uncertainty_score":0.29031363},"labels":[],"label_agreement":null},{"id":"W4399976810","doi":"10.3126/injet.v1i2.66684","title":"Different Demand Response Programs with its Implementation in Various Countries and the Role of TOU DR in the Context of Nepal","year":2024,"lang":"en","type":"article","venue":"International Journal on Engineering Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Context (archaeology); Business; Computer science; Geography; Archaeology","score_opus":0.0031484718924240647,"score_gpt":0.21882265148847652,"score_spread":0.21567417959605245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399976810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993639,0.0012711089,0.002836737,0.0017757904,0.00024173979,0.00014551466,0.0000031390398,0.000051044102,0.00003593049],"genre_scores_gemma":[0.9995591,0.00023786043,0.00010360267,0.00001725067,0.000027126442,0.000039379713,0.0000013941363,0.0000116508,0.0000026521222],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935246,0.000024725963,0.00024971864,0.0000679406,0.00020089436,0.00010429083],"domain_scores_gemma":[0.9996913,0.00015819559,0.00003346241,0.000074349125,0.000034049768,0.000008650658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036839524,0.00008929696,0.00012199007,0.0004962733,0.000008423409,0.00003560719,0.00023526538,0.000039671522,0.0000041323647],"category_scores_gemma":[0.000025576257,0.000052753057,0.00002057171,0.00017841566,0.000046654208,0.00005576245,0.00003171029,0.00023774737,4.1113736e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015705179,0.00011457886,0.014617477,0.00012234716,0.0008555469,0.00034227673,0.005336668,0.407772,0.0050136563,0.5020415,0.00009450578,0.0621189],"study_design_scores_gemma":[0.00978528,0.0012318044,0.064696014,0.0017501586,0.00010505454,0.0011145828,0.007029621,0.81407756,0.041779976,0.009074546,0.0488104,0.00054503034],"about_ca_topic_score_codex":0.000011694469,"about_ca_topic_score_gemma":0.00009372461,"teacher_disagreement_score":0.49296698,"about_ca_system_score_codex":0.00009011433,"about_ca_system_score_gemma":0.000010061291,"threshold_uncertainty_score":0.21512072},"labels":[],"label_agreement":null},{"id":"W4400077752","doi":"10.1016/j.segan.2024.101460","title":"Hierarchical transactive home energy management system groups coordination through multi-level consensus sharing-based distributed ADMM","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"","keywords":"Transactive memory; Hierarchy; Aggregate (composite); Grid; Constraint (computer-aided design); Computer science; Electricity; Smart grid; Distributed computing; Demand response; Distributed generation; Environmental economics; Operations research; Knowledge management; Engineering; Economics; Renewable energy; Mathematics","score_opus":0.009116366504631592,"score_gpt":0.20235443642700174,"score_spread":0.19323806992237014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400077752","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032342975,0.004511024,0.98703974,0.00020672433,0.0013183663,0.0002122504,0.000044549754,0.0013076459,0.002125418],"genre_scores_gemma":[0.99435174,0.00044508564,0.0010786285,0.00008587107,0.00042217693,0.00034912693,0.0003777965,0.00013262776,0.0027569472],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997449,0.00006956875,0.0004605591,0.00073114847,0.00030340411,0.0009863349],"domain_scores_gemma":[0.9991319,0.00013209095,0.000040954226,0.0004059477,0.00009489486,0.00019419266],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027821478,0.0005126147,0.00042086377,0.00028725946,0.00027649445,0.00029940862,0.00026523488,0.000250361,0.000020590543],"category_scores_gemma":[0.0000045375805,0.0005124904,0.00014702126,0.00086387293,0.000118387215,0.00021852236,0.00013818455,0.0003028729,0.0000018094078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060575814,0.00003807248,0.000016042175,0.00071993115,0.00035668112,0.00077240006,0.000047542766,0.6760555,0.000003831789,0.31380168,0.0029842923,0.005143449],"study_design_scores_gemma":[0.0010310971,0.00008491304,0.00034748565,0.00025545486,0.00015504194,0.000017411518,0.0007823866,0.92510605,0.000101425,0.0009433426,0.07059705,0.0005783447],"about_ca_topic_score_codex":0.0003074466,"about_ca_topic_score_gemma":0.00007641781,"teacher_disagreement_score":0.9911174,"about_ca_system_score_codex":0.00072586216,"about_ca_system_score_gemma":0.000030890904,"threshold_uncertainty_score":0.9997327},"labels":[],"label_agreement":null},{"id":"W4400178262","doi":"10.1016/j.epsr.2024.110749","title":"Causality-based cost allocation for peer-to-peer energy trading in distribution system","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Peer-to-peer; Causality (physics); Computer science; Distribution (mathematics); Energy (signal processing); Econometrics; Economics; Distributed computing; Mathematics; Statistics; Physics","score_opus":0.0365871053958208,"score_gpt":0.3174858145771881,"score_spread":0.2808987091813673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400178262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022142746,0.0022929646,0.9634051,0.001054166,0.003583807,0.0019883458,0.00009402253,0.0010277007,0.0044111805],"genre_scores_gemma":[0.9950072,0.000009278212,0.000035511006,0.0000093227745,0.00027366853,0.0023135815,0.00027164043,0.00008273732,0.001997054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99640775,0.00026606367,0.00047394194,0.0004696385,0.0014396006,0.00094301987],"domain_scores_gemma":[0.9986119,0.00037559835,0.000016984435,0.00039621184,0.0004259233,0.00017334434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048735077,0.00021204994,0.0002697407,0.0011051327,0.000115727016,0.00040734894,0.00034370436,0.00014718687,0.0000063743064],"category_scores_gemma":[0.00024882774,0.00022135684,0.000070770955,0.0027886087,0.000013584555,0.00014272728,0.00003363527,0.00033592584,0.00006318189],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010230378,0.000081287304,0.0001189843,0.0034773534,0.00022293576,0.00011866855,0.00036141285,0.5380719,0.008301018,0.08881928,0.35530108,0.0050237672],"study_design_scores_gemma":[0.0002157221,0.000084336134,0.0001655584,0.00029316678,0.000006835753,0.000005264747,0.00012366996,0.70790654,0.002788607,0.000010927296,0.28822184,0.00017752267],"about_ca_topic_score_codex":0.0010574216,"about_ca_topic_score_gemma":0.00013985837,"teacher_disagreement_score":0.97286445,"about_ca_system_score_codex":0.0035073818,"about_ca_system_score_gemma":0.00014490081,"threshold_uncertainty_score":0.91716814},"labels":[],"label_agreement":null},{"id":"W4400318774","doi":"10.1016/j.epsr.2024.110635","title":"A quasi-static time-series approach to assess the impact of high distributed energy resources penetration on transmission system expansion planning","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Series (stratigraphy); Distributed generation; Penetration (warfare); Computer science; High energy; Electric power transmission; Engineering; Geology; Electrical engineering; Operations research; Renewable energy; Engineering physics","score_opus":0.03302978654345405,"score_gpt":0.2999679534753622,"score_spread":0.26693816693190814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400318774","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37898538,0.004589938,0.6030867,0.00008189996,0.0005992376,0.0011293135,0.000042391777,0.0007976068,0.010687539],"genre_scores_gemma":[0.9988601,0.00003442039,0.000054797336,0.0000015753728,0.00012302907,0.0002196619,0.00006192403,0.0000728506,0.00057163986],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99667776,0.00063609093,0.0004669593,0.00039492126,0.0011836804,0.00064056664],"domain_scores_gemma":[0.99877137,0.00041452068,0.000035005156,0.00049574964,0.00013252579,0.00015082354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017385848,0.00026063225,0.00034845143,0.00085632905,0.00018773763,0.0003290091,0.0004359233,0.00011842703,0.000009881335],"category_scores_gemma":[0.0000548998,0.00017152294,0.00010695099,0.0024579077,0.000026465657,0.00016542844,0.00004582885,0.00038095572,0.000034009583],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012280574,0.00008896749,0.000012046766,0.00076673145,0.00024262964,0.000031306732,0.0012447519,0.95994633,0.011590709,0.0037338387,0.02135288,0.0008669715],"study_design_scores_gemma":[0.00016369887,0.0011256948,0.0011129255,0.00096718926,0.000017730206,0.000030302375,0.0008223587,0.98493415,0.0044047874,0.000017990207,0.0061614527,0.00024173348],"about_ca_topic_score_codex":0.0010606884,"about_ca_topic_score_gemma":0.0000014038806,"teacher_disagreement_score":0.6198747,"about_ca_system_score_codex":0.00081182475,"about_ca_system_score_gemma":0.000093298535,"threshold_uncertainty_score":0.6994503},"labels":[],"label_agreement":null},{"id":"W4400410871","doi":"10.1109/mits.2024.3401536","title":"An Introduction to the Smart Urban Mobility Laboratory at University of South Florida [ITS Research Lab]","year":2024,"lang":"en","type":"article","venue":"IEEE Intelligent Transportation Systems Magazine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Aeronautics; Computer science","score_opus":0.02533476871600223,"score_gpt":0.25125975821735547,"score_spread":0.22592498950135323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400410871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9325451,0.00087331765,0.057198085,0.0004138273,0.0068685943,0.00090349565,0.00027403276,0.0005596751,0.00036384494],"genre_scores_gemma":[0.99701804,0.000067604604,0.000038616814,0.00000598592,0.000934693,0.000025275582,0.000098222496,0.000041459443,0.0017701312],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982489,0.0001546946,0.00039579498,0.00040190935,0.0005292654,0.00026946684],"domain_scores_gemma":[0.9989079,0.000059864968,0.000029820889,0.0005211527,0.00035850206,0.0001227181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012840845,0.00016916312,0.00019554657,0.0002935615,0.00010486725,0.000050196337,0.0002869478,0.000078508,0.0001229017],"category_scores_gemma":[0.000011042234,0.00015718212,0.000064804815,0.001105966,0.000055575063,0.00021727689,0.0000073174,0.00022116577,0.00063333125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056477536,0.00003647415,0.0011274082,0.0007123595,0.00012696895,0.00002136404,0.0067269476,0.9245972,0.016662853,0.0017485288,0.04797737,0.00020602651],"study_design_scores_gemma":[0.00014157072,0.00015699731,0.012294017,0.00013567224,0.00007732512,0.000001521745,0.0024244436,0.07453102,0.031828284,0.000006083452,0.8780913,0.00031181143],"about_ca_topic_score_codex":0.000111746886,"about_ca_topic_score_gemma":0.00095772836,"teacher_disagreement_score":0.8500662,"about_ca_system_score_codex":0.00033501233,"about_ca_system_score_gemma":0.000035652625,"threshold_uncertainty_score":0.81404036},"labels":[],"label_agreement":null},{"id":"W4400446536","doi":"10.3390/en17143371","title":"Review on Advanced Storage Control Applied to Optimized Operation of Energy Systems for Buildings and Districts: Insights and Perspectives","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministero dell'Università e della Ricerca; European Commission","keywords":"Flexibility (engineering); Computer science; Context (archaeology); Renewable energy; Energy storage; Control (management); Systems engineering; Resilience (materials science); Risk analysis (engineering); Component (thermodynamics); Reliability engineering; Industrial engineering; Engineering; Management science; Artificial intelligence","score_opus":0.006651571402258944,"score_gpt":0.20705471162775907,"score_spread":0.20040314022550013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400446536","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06710215,0.6364811,0.28984725,0.0004291594,0.0010487392,0.0011742847,0.000041764673,0.00061129616,0.0032642127],"genre_scores_gemma":[0.9627125,0.035278656,0.0012533757,0.0000706552,0.000087472225,0.00045063614,0.000009874382,0.000029867058,0.00010696002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994214,0.000013579978,0.00017239458,0.00020923119,0.00008015607,0.00010319106],"domain_scores_gemma":[0.99969554,0.000103982944,0.000017241253,0.00012005699,0.000024144523,0.00003900874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000079544494,0.00014043368,0.0002641798,0.00011375373,0.00003217529,0.00005540095,0.000050805043,0.000027868384,0.0000016860654],"category_scores_gemma":[0.000020704661,0.00011950983,0.000025442861,0.000115447656,0.000017908977,0.00009890197,0.000021113918,0.000029763776,4.343978e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025627785,0.0000051472116,1.9296508e-7,0.0011547711,0.00007611625,9.2040295e-7,0.00023456574,0.9154685,0.0018218851,0.0759997,0.0024823253,0.0027302066],"study_design_scores_gemma":[0.0021534727,0.0002891546,0.000071669696,0.0036899638,0.00022353829,0.000003183737,0.0013653623,0.4846224,0.006147956,0.00015636158,0.50061417,0.0006627435],"about_ca_topic_score_codex":0.000012281496,"about_ca_topic_score_gemma":0.0000025969334,"teacher_disagreement_score":0.89561033,"about_ca_system_score_codex":0.000053381224,"about_ca_system_score_gemma":0.000004565228,"threshold_uncertainty_score":0.48734695},"labels":[],"label_agreement":null},{"id":"W4400599908","doi":"10.1016/j.apenergy.2024.123868","title":"A multi-stage techno-economic model for harnessing flexibility from IoT-enabled appliances and smart charging systems: Developing a competitive local flexibility market using Stackelberg game theory","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Stackelberg competition; Flexibility (engineering); Internet of Things; Game theory; Computer science; Environmental economics; Business; Industrial organization; Economics; Computer security; Microeconomics","score_opus":0.039231063550152226,"score_gpt":0.26262643610970066,"score_spread":0.22339537255954844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400599908","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.080730624,0.00171967,0.91284895,0.00001733584,0.0006640814,0.0005521965,0.00016314589,0.0011125644,0.0021914262],"genre_scores_gemma":[0.9631554,0.00008980916,0.035191197,0.00005488034,0.00022635845,0.000674483,0.00007637999,0.0001619152,0.00036960575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972961,0.000058914844,0.0006648336,0.0010937048,0.00018645823,0.0006999742],"domain_scores_gemma":[0.9987735,0.0004006418,0.0000868574,0.00057002227,0.00003617892,0.00013277453],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008635915,0.0005627296,0.00064662355,0.00023330223,0.00020170285,0.00032869258,0.00029114593,0.0002239372,0.000028817534],"category_scores_gemma":[0.000014206166,0.000598357,0.00010824783,0.00022927459,0.00021144176,0.0002356974,0.00024487695,0.00023014388,0.000006805594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007948491,0.000018072942,0.000020576881,0.0007833538,0.00026612764,0.000005340823,0.00025891964,0.868607,0.0022367744,0.12258879,0.00004511253,0.005090462],"study_design_scores_gemma":[0.0006108681,0.000007497802,0.000044149943,0.00034474075,0.000083372855,0.0000021978417,0.0009786994,0.9817303,0.003815944,0.0045938552,0.007113407,0.0006749881],"about_ca_topic_score_codex":0.0007103006,"about_ca_topic_score_gemma":0.00039435943,"teacher_disagreement_score":0.8824248,"about_ca_system_score_codex":0.0011814401,"about_ca_system_score_gemma":0.00013150847,"threshold_uncertainty_score":0.9996468},"labels":[],"label_agreement":null},{"id":"W4400618058","doi":"10.1016/j.scs.2024.105664","title":"An integrated price- and incentive-based demand response program for smart residential buildings: A robust multi-objective model","year":2024,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alterra Power (Canada)","funders":"Iran National Science Foundation","keywords":"Demand response; Incentive; Architectural engineering; Computer science; Business; Engineering; Economics; Microeconomics; Electrical engineering","score_opus":0.008922973927154038,"score_gpt":0.23885967916062906,"score_spread":0.229936705233475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400618058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4533558,0.0013202786,0.5432628,0.00010152243,0.00014593646,0.0009358618,0.000029191526,0.0007442436,0.00010438628],"genre_scores_gemma":[0.95399547,0.00027613816,0.042244438,0.0000762152,0.00008612093,0.0006546227,0.000040812927,0.00008188185,0.0025443183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877936,0.000045778736,0.00018257633,0.0003646616,0.00012455284,0.0005030969],"domain_scores_gemma":[0.99945617,0.00011659044,0.000019253308,0.00015070927,0.00015443531,0.000102834965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006028482,0.00023586817,0.00020016906,0.00010198327,0.00030205565,0.00049490813,0.00009058868,0.00012606246,0.0000044373755],"category_scores_gemma":[0.000043086708,0.00022944732,0.00010097735,0.00025752615,0.00015384435,0.00040419013,0.00006706381,0.00016950001,1.902445e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003568785,0.00008221115,0.0001827952,0.0028265708,0.00036559883,0.000031578442,0.010692245,0.9682166,0.00030118274,0.005848138,0.009168214,0.0019280113],"study_design_scores_gemma":[0.0007380402,0.00017084183,0.00060952624,0.000078355115,0.0000636155,9.880472e-7,0.03256801,0.95154744,0.00028912775,0.00047140673,0.013193085,0.00026957036],"about_ca_topic_score_codex":0.00013161104,"about_ca_topic_score_gemma":0.00001912397,"teacher_disagreement_score":0.50101835,"about_ca_system_score_codex":0.00033855182,"about_ca_system_score_gemma":0.0001232144,"threshold_uncertainty_score":0.93565905},"labels":[],"label_agreement":null},{"id":"W4400739389","doi":"10.1002/net.22242","title":"Three network design problems for community energy storage","year":2024,"lang":"en","type":"article","venue":"Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science","score_opus":0.027192181879567113,"score_gpt":0.20845300647603787,"score_spread":0.18126082459647075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400739389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018754414,0.0060665747,0.9857216,0.00003937235,0.0034317258,0.00025059222,0.0000021024064,0.0013346666,0.0029658498],"genre_scores_gemma":[0.976626,0.00049240177,0.016809616,0.00023734281,0.0042258743,0.0007420091,0.0000900849,0.00022727608,0.00054943765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900806,0.00005624236,0.00019908747,0.00015840189,0.0001046421,0.00047355628],"domain_scores_gemma":[0.999143,0.00034298375,0.0000131003735,0.00041181047,0.000018450317,0.00007067071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005602477,0.0002049306,0.00017333137,0.00005431187,0.00016236442,0.00012071794,0.00027788355,0.00012619418,0.00003390464],"category_scores_gemma":[0.0000055099913,0.00020666065,0.000086330576,0.00032139456,0.000024132942,0.00010105788,0.00007889451,0.0003388833,0.000010966643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040802806,0.0000066583366,0.000007804793,0.00006267639,0.00010029592,0.0000036089707,0.000029879755,0.738586,0.000004439925,0.0065760645,0.23574777,0.018870726],"study_design_scores_gemma":[0.00009572196,0.000039950493,0.000061694554,0.00008827663,0.00002933385,0.0000014594407,0.000005625391,0.7784033,0.000008773668,0.0042875297,0.2168038,0.00017452269],"about_ca_topic_score_codex":0.00005990143,"about_ca_topic_score_gemma":0.00048784068,"teacher_disagreement_score":0.9764384,"about_ca_system_score_codex":0.00010653587,"about_ca_system_score_gemma":0.0000091276615,"threshold_uncertainty_score":0.8427377},"labels":[],"label_agreement":null},{"id":"W4401041987","doi":"10.1016/j.ijhydene.2024.07.273","title":"A novel risk-averse optimal scheduling strategy for active distribution networks equipped with power-to-X technologies","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Public Authority for Applied Education and Training","keywords":"Computer science; Scheduling (production processes); Mathematical optimization; Power (physics); Operations research; Mathematics","score_opus":0.00959017941805569,"score_gpt":0.2364946537582608,"score_spread":0.2269044743402051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401041987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16652475,0.00034035693,0.831397,0.00018487936,0.0010434669,0.000054540396,0.00007677647,0.00020065969,0.00017760404],"genre_scores_gemma":[0.9929483,0.0001690717,0.006336228,0.000019226569,0.00038638242,0.000024831923,0.000042020263,0.000041399417,0.000032563763],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893284,0.000008846626,0.00032236602,0.00016096927,0.00034072032,0.00023425558],"domain_scores_gemma":[0.9994319,0.00007767274,0.00010297299,0.00010378285,0.00022079296,0.00006287645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001575475,0.000178895,0.00016862535,0.00028195838,0.00003620643,0.00012248792,0.0003942413,0.0000821471,0.000013191766],"category_scores_gemma":[0.000043326676,0.00015299043,0.00012836371,0.00021663196,0.000029954435,0.00030074795,0.00007230649,0.00020826739,0.0000028469992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016427378,0.00003088982,0.0000111413465,0.0000056235435,0.0011012752,0.00008767511,0.000034478395,0.9733686,0.0023339095,0.0058705932,0.0004254409,0.01656611],"study_design_scores_gemma":[0.0006449012,0.00032855303,0.000052839478,0.00018017493,0.00009231585,0.00020511574,0.0003125544,0.93230885,0.033499457,0.0002764687,0.0318643,0.0002344774],"about_ca_topic_score_codex":0.00001529987,"about_ca_topic_score_gemma":0.000020425752,"teacher_disagreement_score":0.8264235,"about_ca_system_score_codex":0.00035956837,"about_ca_system_score_gemma":0.000044917604,"threshold_uncertainty_score":0.62387687},"labels":[],"label_agreement":null},{"id":"W4401069949","doi":"10.1016/j.apenergy.2024.123988","title":"Residential consumer enrollment in demand response: An agent based approach","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Strategic Research Council","keywords":"Flexibility (engineering); Quarter (Canadian coin); Demand response; Environmental economics; Business; Energy (signal processing); Consumer demand; Economics; Marketing; Microeconomics; Engineering; Electricity; Geography; Statistics","score_opus":0.00970110540018108,"score_gpt":0.2078052116385689,"score_spread":0.19810410623838784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401069949","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37290272,0.0028096416,0.5302852,0.000198549,0.00253707,0.0004892288,0.000014438206,0.0026535364,0.088109635],"genre_scores_gemma":[0.9969864,0.000059346883,0.0017221728,0.00015072462,0.00017375004,0.0003498606,0.000059583854,0.00008548457,0.00041270012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985596,0.00006725196,0.00029636075,0.00041453404,0.0002785866,0.00038368924],"domain_scores_gemma":[0.9993669,0.00007375032,0.000012422991,0.00042932766,0.0000071265767,0.00011047558],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041268748,0.000243738,0.00019747102,0.00038208583,0.000036714573,0.000106509506,0.00021087746,0.000104059574,0.000115295654],"category_scores_gemma":[0.0000041384205,0.00025510564,0.00005208747,0.00039707797,0.000034278393,0.000086418535,0.000057373993,0.00013563014,0.00005128114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001293458,0.000059945858,0.000018939734,0.00006874915,0.0000703429,0.00007189182,0.00010562773,0.9665083,0.0065082926,0.01706759,0.0068490542,0.0025418978],"study_design_scores_gemma":[0.0008756335,0.0000411014,0.0014752126,0.0000353411,0.000041268137,0.0000036540032,0.000083253515,0.70676273,0.016253892,0.00041298775,0.27349672,0.0005182077],"about_ca_topic_score_codex":0.00009874049,"about_ca_topic_score_gemma":0.00009613381,"teacher_disagreement_score":0.62408364,"about_ca_system_score_codex":0.00021639599,"about_ca_system_score_gemma":0.000034370685,"threshold_uncertainty_score":0.9999901},"labels":[],"label_agreement":null},{"id":"W4401107662","doi":"10.47604/ijts.2815","title":"The Effect of Smart Grid Technology on Energy Consumption Management in Canada","year":2024,"lang":"en","type":"article","venue":"International Journal of Technology and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Smart grid; Energy consumption; Computer science; Energy management; Environmental economics; Renewable energy; Demand response; Big data; Consumption (sociology); Efficient energy use; Engineering; Energy (signal processing); Electricity; Electrical engineering; Data mining","score_opus":0.0036708286313792476,"score_gpt":0.2022788544140931,"score_spread":0.19860802578271386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401107662","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97387743,0.011033349,0.0010456614,0.0017131253,0.010739068,0.00010264988,0.0000053895396,0.00007928883,0.0014040631],"genre_scores_gemma":[0.998462,0.001364665,0.0000128352385,0.0000060893726,0.000069263166,0.000017269762,5.858778e-7,0.000008157013,0.000059084472],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992538,0.000020594573,0.00034587237,0.00007321397,0.00020460076,0.00010189649],"domain_scores_gemma":[0.9996926,0.00010024465,0.00006335929,0.00009626071,0.000034433557,0.00001309263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025338048,0.00008444165,0.0001486457,0.00093983696,0.000015977139,0.000019726514,0.0002908746,0.00006724745,0.0000025629708],"category_scores_gemma":[0.000016089578,0.000058325655,0.000024693176,0.00020893893,0.00004855056,0.00003674438,0.000049264967,0.0001753246,0.0000014564922],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024318503,0.000023903152,0.061205387,0.0005116184,0.0034526358,0.002497882,0.000028206228,0.17502047,0.0010608983,0.4438246,0.014461788,0.29766944],"study_design_scores_gemma":[0.0029908323,0.00119638,0.010908265,0.0039543053,0.00018231437,0.0022273296,0.000825383,0.15949711,0.03159072,0.003491553,0.7825596,0.00057625934],"about_ca_topic_score_codex":0.0029870863,"about_ca_topic_score_gemma":0.015076635,"teacher_disagreement_score":0.76809776,"about_ca_system_score_codex":0.00031679607,"about_ca_system_score_gemma":0.000020047395,"threshold_uncertainty_score":0.8413117},"labels":[],"label_agreement":null},{"id":"W4401114264","doi":"10.1109/cpe-powereng60842.2024.10604314","title":"Practical Cost Effectiveness Analysis for Solar Energy Systems: Case Study of Stand-Alone Retail Building","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Solar energy; Computer science; Photovoltaic system; Energy (signal processing); Architectural engineering; Environmental economics; Engineering; Electrical engineering; Economics; Mathematics; Statistics","score_opus":0.03791015750043722,"score_gpt":0.3047690627353386,"score_spread":0.2668589052349014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401114264","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22151446,0.00051624305,0.7760432,0.000012597529,0.0006276074,0.00047501514,0.000010955156,0.00034833513,0.00045158103],"genre_scores_gemma":[0.99824053,0.00001704632,0.0009785698,0.000002289614,0.000120368786,0.00038973763,0.0000065151435,0.000049332288,0.00019561744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987676,0.00011407352,0.00034505574,0.00030752106,0.00022635932,0.00023937895],"domain_scores_gemma":[0.9989099,0.0005837433,0.000026318232,0.00034015428,0.000070960734,0.00006894737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069847686,0.0001856902,0.0004291969,0.00043304288,0.000050673283,0.00010366399,0.00007933729,0.0000600279,0.000022455451],"category_scores_gemma":[0.000045818088,0.00016742549,0.00013374917,0.0009422209,0.000013018513,0.00017835262,0.000057043806,0.0000841833,0.0000017648817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025671034,0.00012383533,0.0007170548,0.00082896044,0.0054591997,0.0012827564,0.00012403048,0.98552275,0.00024989384,0.0042905835,0.0006254424,0.0007498438],"study_design_scores_gemma":[0.00051979214,0.00017969978,0.00017676008,0.000062912084,0.0019438211,0.0000990262,0.002187531,0.98442596,0.0017120631,0.000007412909,0.008464957,0.0002200696],"about_ca_topic_score_codex":0.0012654567,"about_ca_topic_score_gemma":0.00043473655,"teacher_disagreement_score":0.77672607,"about_ca_system_score_codex":0.00020111298,"about_ca_system_score_gemma":0.00001693314,"threshold_uncertainty_score":0.68274134},"labels":[],"label_agreement":null},{"id":"W4401402766","doi":"10.1049/enc2.12123","title":"A novel iterative double auction design and simulation platform for packetized energy trading of prosumers in a residential microgrid","year":2024,"lang":"en","type":"article","venue":"Energy Conversion and Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Microgrid; Bidding; Demand response; Computer science; Scalability; Double auction; Context (archaeology); Environmental economics; Distributed computing; Business; Electricity; Common value auction; Control (management); Engineering; Microeconomics; Economics","score_opus":0.019696202323846262,"score_gpt":0.2130411520925637,"score_spread":0.19334494976871744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401402766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6095947,0.0005386008,0.3886283,0.000053813023,0.0008222889,0.00015183016,0.0000070556034,0.00007829819,0.0001250865],"genre_scores_gemma":[0.99724674,0.00068774266,0.0018068235,0.000019112536,0.00006753775,0.000031347477,0.00002196481,0.000022736678,0.00009598835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944633,0.000005992553,0.00021106089,0.00018560226,0.000025439105,0.00012559562],"domain_scores_gemma":[0.99977547,0.00009144528,0.000027938006,0.000059056707,0.000009870117,0.00003620253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012946676,0.000113627895,0.00015002098,0.00022705775,0.000029225188,0.000059112714,0.000032048323,0.00006758728,0.000009234542],"category_scores_gemma":[0.000002471269,0.00012740443,0.000033486805,0.000069688096,0.00002473279,0.00029315692,0.000021195656,0.00003391956,2.4209996e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022792602,0.000008434775,0.00001680305,0.0000990012,0.000072211784,9.159489e-7,0.000441489,0.9853309,0.0034586322,0.0047504357,0.0002454122,0.0053478433],"study_design_scores_gemma":[0.0013888938,0.00003945912,0.000043637487,0.000043616186,0.000019494933,0.0000023016823,0.00010734317,0.96336967,0.019255629,0.00023096683,0.0153722325,0.00012675615],"about_ca_topic_score_codex":0.00010765323,"about_ca_topic_score_gemma":0.00006858738,"teacher_disagreement_score":0.38765204,"about_ca_system_score_codex":0.000100084435,"about_ca_system_score_gemma":0.000012729965,"threshold_uncertainty_score":0.5195402},"labels":[],"label_agreement":null},{"id":"W4401416789","doi":"10.1109/jiot.2024.3440320","title":"A Clockless Derivative-Dependent Sampling Scheme for Energy-Efficient IoT Applications","year":2024,"lang":"en","type":"article","venue":"IEEE Internet of Things Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Computer science; Scheme (mathematics); Derivative (finance); Sampling (signal processing); Algorithm; Mathematical optimization; Telecommunications; Mathematics","score_opus":0.019277141885294787,"score_gpt":0.25637748485779444,"score_spread":0.23710034297249966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401416789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054518502,0.0012216927,0.9406515,0.00010934136,0.002180036,0.00013152168,0.000004908547,0.00022465269,0.00095788465],"genre_scores_gemma":[0.9766481,0.00008297807,0.021874104,0.00007376122,0.00066528196,0.000114173046,0.000003395085,0.00007060585,0.0004676179],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877936,0.000012706349,0.00046276566,0.00019344037,0.00027738887,0.000274359],"domain_scores_gemma":[0.9994559,0.000108108514,0.00007750318,0.00016838658,0.00009763941,0.00009242208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035044705,0.00018171575,0.00019762377,0.00027489522,0.000052879266,0.0002120583,0.0003850277,0.00006569171,0.000045048462],"category_scores_gemma":[0.000016104725,0.00017389993,0.00017235032,0.00016143774,0.00003075223,0.0001307226,0.000056382807,0.00027445777,0.000012299529],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022463859,0.00006732186,0.000022525597,0.00037564395,0.0006347894,0.000014241006,0.0011270116,0.90955514,0.038576744,0.01880505,0.008623668,0.022175394],"study_design_scores_gemma":[0.00023938189,0.00004428817,0.000016448492,0.00037455448,0.0000505792,0.000083796556,0.00012737184,0.82047504,0.063934356,0.0011378665,0.11329164,0.00022466973],"about_ca_topic_score_codex":0.000018205126,"about_ca_topic_score_gemma":0.000002704265,"teacher_disagreement_score":0.9221296,"about_ca_system_score_codex":0.00022466657,"about_ca_system_score_gemma":0.00002395777,"threshold_uncertainty_score":0.70914334},"labels":[],"label_agreement":null},{"id":"W4401476820","doi":"10.1016/j.apenergy.2024.124081","title":"Bottom-up framework for modelling occupancy-based demand-side management strategies in a mixed-use district","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Fonds de Recherche du Québec - Santé; Social Sciences and Humanities Research Council of Canada; Fonds de recherche du Québec – Nature et technologies; Laurea University of Applied Sciences","keywords":"Occupancy; Demand side; Environmental economics; Business; Computer science; Environmental science; Engineering; Economics; Civil engineering","score_opus":0.015186479107637915,"score_gpt":0.22328896611973445,"score_spread":0.20810248701209655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401476820","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010399129,0.0006137231,0.9792338,0.000038479924,0.0011876847,0.0002520522,0.000014529244,0.00094699336,0.0073136147],"genre_scores_gemma":[0.9395514,0.00028686202,0.058383506,0.00009956971,0.00021110878,0.001057418,0.00009972307,0.00012566366,0.00018475443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982944,0.000012909719,0.00038978842,0.0004912033,0.00023533075,0.0005763702],"domain_scores_gemma":[0.99919415,0.00023631174,0.000023564055,0.00045017237,0.000011812948,0.00008401182],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015053905,0.00036063296,0.0002801646,0.00037600906,0.000056275014,0.0002983451,0.00026331568,0.00015714394,0.000014158479],"category_scores_gemma":[0.0000035226055,0.00038253682,0.00011535365,0.0005995522,0.000026196984,0.00018114012,0.00006364796,0.00020263859,0.000018915647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001711921,0.000015146036,0.0000036076158,0.0002387984,0.000085742955,0.000022421405,0.000028874738,0.55562896,0.000041196607,0.43918595,0.0010723147,0.0036599033],"study_design_scores_gemma":[0.00039918238,0.000015975873,0.000079016754,0.0001788657,0.00006733964,5.0608094e-7,0.00015036589,0.89752936,0.0016013802,0.045793373,0.053734332,0.00045032147],"about_ca_topic_score_codex":0.000093063034,"about_ca_topic_score_gemma":0.00009479749,"teacher_disagreement_score":0.92915225,"about_ca_system_score_codex":0.00020084655,"about_ca_system_score_gemma":0.00002737546,"threshold_uncertainty_score":0.9998627},"labels":[],"label_agreement":null},{"id":"W4401567648","doi":"10.1109/access.2024.3443471","title":"Optimal Multi-Microgrids Energy Management Through Information Gap Decision Theory and Tunicate Swarm Algorithm","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Tunicate; Computer science; Swarm behaviour; Decision theory; Energy (signal processing); Algorithm; Mathematical optimization; Artificial intelligence; Mathematics","score_opus":0.016773893216493092,"score_gpt":0.27112638396181504,"score_spread":0.25435249074532196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401567648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0159257,0.0017307879,0.97233975,0.000037086633,0.0023402073,0.00014431802,0.000011069424,0.0007120162,0.0067590843],"genre_scores_gemma":[0.8755817,0.0109453695,0.11087626,0.00068258645,0.0005473896,0.0002994966,0.00010293111,0.00014472268,0.0008195597],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989571,0.000025349034,0.00030051346,0.0002233567,0.00021226626,0.00028139152],"domain_scores_gemma":[0.99947727,0.00007947166,0.000022801682,0.00033732425,0.000023379973,0.00005976223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002660051,0.0002203195,0.00014529853,0.00022234314,0.00006708403,0.0005304477,0.00039765667,0.000072228024,0.000034141514],"category_scores_gemma":[0.0000045085467,0.00020785554,0.00005234332,0.00032061603,0.00003849175,0.0018506672,0.00027174162,0.00011224069,0.00007770091],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016844373,0.000021811627,0.000008574973,0.00021890824,0.00026443525,0.00005375899,0.0003030097,0.38899058,0.000060201786,0.015794422,0.010896298,0.58337116],"study_design_scores_gemma":[0.00055540714,0.000019974117,0.0005021262,0.00016456327,0.0000867185,0.00001360634,0.000098744604,0.64882386,0.006823765,0.0026091102,0.33987927,0.00042287176],"about_ca_topic_score_codex":0.000032259806,"about_ca_topic_score_gemma":0.0000058361993,"teacher_disagreement_score":0.8614635,"about_ca_system_score_codex":0.00009396165,"about_ca_system_score_gemma":0.0000053291733,"threshold_uncertainty_score":0.8476103},"labels":[],"label_agreement":null},{"id":"W4401585461","doi":"10.1007/978-3-031-65906-5_1","title":"Introduction","year":2024,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Philosophy","score_opus":0.004883964980824249,"score_gpt":0.16639782800059813,"score_spread":0.16151386301977388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401585461","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000016203114,0.0051795035,0.0011053182,0.00023964712,0.0077233324,0.000055757682,0.000004816115,0.00089811673,0.98477733],"genre_scores_gemma":[0.0040918766,0.003708212,0.00022976623,0.00007161091,0.0069873882,0.000044726665,0.000058229492,0.00034547772,0.98446274],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99859196,0.0000034020452,0.00037158243,0.0004798991,0.00024328171,0.00030989823],"domain_scores_gemma":[0.99931294,0.000013591333,0.000029326955,0.00056705624,0.00001649495,0.000060612907],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009877962,0.00041561353,0.00033006736,0.00053383753,0.000016460865,0.00005175727,0.00022228037,0.00029944954,0.00084661716],"category_scores_gemma":[0.0000046188866,0.000488388,0.00012197999,0.0000841454,0.00004155857,0.00007114488,0.00014878502,0.00042437803,0.000572219],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018009207,0.0000024745636,5.943288e-7,0.00010617354,0.000092830116,0.000079161946,0.000010976774,0.28861344,0.000028169574,0.66587436,0.039069127,0.0061208876],"study_design_scores_gemma":[0.00006757138,0.0000101385185,0.00000804033,0.00015115629,0.00003384973,0.0000065206,0.0000014404676,0.007744555,0.0002883136,0.026439818,0.9648121,0.00043650105],"about_ca_topic_score_codex":0.000042093186,"about_ca_topic_score_gemma":0.0002156425,"teacher_disagreement_score":0.925743,"about_ca_system_score_codex":0.00045358442,"about_ca_system_score_gemma":0.000012007672,"threshold_uncertainty_score":0.99975675},"labels":[],"label_agreement":null},{"id":"W4401586117","doi":"10.1007/978-3-031-65906-5_4","title":"Pyomo Formulation of Electricity System Optimization Problem","year":2024,"lang":"en","type":"book-chapter","venue":"SpringerBriefs in energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electricity; Mathematical optimization; Computer science; Electricity system; Mathematics; Engineering; Electricity generation; Electrical engineering; Physics; Thermodynamics; Power (physics)","score_opus":0.0054516540123306576,"score_gpt":0.16826161604104498,"score_spread":0.1628099620287143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401586117","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000048753962,0.00212922,0.1052543,0.000009298885,0.0010145676,0.00019232204,0.000009519691,0.000692663,0.8906494],"genre_scores_gemma":[0.71549994,0.0036999465,0.012307418,0.000036113142,0.0014096696,0.00022772413,0.00035264844,0.0009748661,0.26549166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983802,0.0000070530477,0.0006595448,0.00035373846,0.00032145373,0.00027801437],"domain_scores_gemma":[0.99936134,0.00002583124,0.00011807358,0.00039407835,0.000054040043,0.000046623783],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015357528,0.000377082,0.0004436235,0.00066316896,0.000018562188,0.000029677232,0.00020651662,0.00033937956,0.000047226647],"category_scores_gemma":[0.000003963033,0.00043319663,0.00012812331,0.00017677281,0.000018285029,0.00010274367,0.0001029611,0.00024313733,0.00001577685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031319582,0.0000030229435,0.000002365178,0.0005858214,0.00007134504,0.000011390775,0.000013899909,0.5722762,0.00002197356,0.42592123,0.00013421976,0.00095544296],"study_design_scores_gemma":[0.0001747103,0.000030171886,0.000010139993,0.0011284065,0.00008018572,0.000004475502,0.0000029171417,0.85971975,0.0011165695,0.0041924356,0.13307616,0.00046406308],"about_ca_topic_score_codex":0.00011783024,"about_ca_topic_score_gemma":0.000111924135,"teacher_disagreement_score":0.7154512,"about_ca_system_score_codex":0.0007100267,"about_ca_system_score_gemma":0.000020259316,"threshold_uncertainty_score":0.999812},"labels":[],"label_agreement":null},{"id":"W4401639746","doi":"10.3390/en17164075","title":"Optimizing Virtual Power Plant Management: A Novel MILP Algorithm to Minimize Levelized Cost of Energy, Technical Losses, and Greenhouse Gas Emissions","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Trois-Rivières; Université du Québec à Rimouski","funders":"","keywords":"Cost of electricity by source; Greenhouse gas; Power station; Environmental science; Energy (signal processing); Computer science; Greenhouse; Power (physics); Process engineering; Electricity generation; Environmental economics; Algorithm; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Economics; Agronomy; Physics","score_opus":0.010701307141175474,"score_gpt":0.21659769687893632,"score_spread":0.20589638973776084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401639746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03399007,0.0056220503,0.9275089,0.0004684045,0.0023126714,0.00040220455,0.0004006812,0.0028360004,0.026459016],"genre_scores_gemma":[0.69274634,0.00391632,0.2982701,0.00019829089,0.00030816582,0.0003849241,0.00011140906,0.00028453296,0.0037798954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985118,0.000012786441,0.00038553323,0.00039773324,0.00030317952,0.00038899717],"domain_scores_gemma":[0.99928963,0.00012017636,0.000024019844,0.0003787225,0.000019331146,0.0001681166],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012625367,0.0003146474,0.00032780253,0.00043003316,0.000062897685,0.00009536176,0.00026726082,0.000103581195,0.00007379391],"category_scores_gemma":[0.000015556769,0.00030131574,0.000089103356,0.00040225804,0.00007042387,0.000145595,0.00038408127,0.00013197237,0.0000070496217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005067851,0.00011363166,0.000008126136,0.00024446897,0.00057484023,0.0002737736,0.00039470676,0.86786616,0.014583338,0.041422367,0.02653771,0.0479302],"study_design_scores_gemma":[0.0013486565,0.00012034024,0.00031877053,0.0009850895,0.00020458555,0.00006753777,0.00067814474,0.20936304,0.015202829,0.00011915308,0.770622,0.00096985186],"about_ca_topic_score_codex":0.000059212533,"about_ca_topic_score_gemma":0.000033542932,"teacher_disagreement_score":0.7440843,"about_ca_system_score_codex":0.0000875356,"about_ca_system_score_gemma":0.000014423694,"threshold_uncertainty_score":0.9999439},"labels":[],"label_agreement":null},{"id":"W4401671684","doi":"10.1016/j.apenergy.2024.124141","title":"Efficient demand response location targeting for price spike mitigation by exploiting price-demand relationship","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Shanghai Jiao Tong University; National Natural Science Foundation of China","keywords":"Demand response; Spike (software development); On demand; Economics; Industrial organization; Microeconomics; Econometrics; Business; Natural resource economics; Commerce; Engineering","score_opus":0.00787546134417623,"score_gpt":0.20470674448775203,"score_spread":0.19683128314357579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401671684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14160876,0.0012560411,0.85057575,0.00018922915,0.00056078593,0.00026093377,0.0000057586603,0.0009261216,0.004616633],"genre_scores_gemma":[0.9941874,0.000027357468,0.004032795,0.00008227537,0.00033571717,0.0006458727,0.00016456094,0.00010113726,0.00042288614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859136,0.000039904553,0.0003891799,0.00037659405,0.00023237779,0.0003705875],"domain_scores_gemma":[0.99900436,0.00059866486,0.000049436352,0.00022086353,0.000044186283,0.00008248906],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007845453,0.00022460874,0.000151412,0.00020473734,0.00017709141,0.00012213767,0.00012503468,0.000112893875,0.000014389964],"category_scores_gemma":[0.000111552756,0.00024976034,0.000052534262,0.00055332703,0.000022977229,0.00008708041,0.00003955158,0.00011275861,0.00003101759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038297097,0.000015286192,0.000012207283,0.00019032237,0.000043781274,0.0000014387145,0.00024536744,0.9171054,0.026634008,0.040091325,0.0148738595,0.0007487114],"study_design_scores_gemma":[0.00033059658,0.00002348195,0.00031357072,0.00008826937,0.000042724347,0.0000014487798,0.00018218758,0.85229695,0.030122763,0.0009823947,0.11526073,0.00035486754],"about_ca_topic_score_codex":0.0000062157383,"about_ca_topic_score_gemma":0.0000018861095,"teacher_disagreement_score":0.85257864,"about_ca_system_score_codex":0.00026680817,"about_ca_system_score_gemma":0.000023632874,"threshold_uncertainty_score":0.99999547},"labels":[],"label_agreement":null},{"id":"W4401693671","doi":"10.1109/ictem60690.2024.10631993","title":"Useful Application of Machine learning Methods in Smart Grids: A Mini Review","year":2024,"lang":"en","type":"review","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Machine learning; Artificial intelligence","score_opus":0.04192720137419192,"score_gpt":0.36494109933730323,"score_spread":0.3230138979631113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401693671","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.1938082e-8,0.9563394,0.031686146,0.000016848553,0.00037584215,0.00077416806,0.000005005757,0.00034162262,0.010460898],"genre_scores_gemma":[2.3685989e-7,0.9824484,0.015451487,0.00002342084,0.00008403838,0.000652459,0.00014515687,0.00012538821,0.0010694203],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99800515,0.00021908907,0.0010270297,0.00036525077,0.00016368223,0.00021979859],"domain_scores_gemma":[0.9991405,0.00015347436,0.00012058537,0.0005241703,0.000016854727,0.000044412045],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011475795,0.0004182937,0.0017126655,0.00042063606,0.000008741698,0.000014582795,0.00032370188,0.00015798314,0.000116972355],"category_scores_gemma":[0.00007079017,0.00033606848,0.0003665894,0.0010917096,0.000013709182,0.000043982815,0.0001630315,0.00054953806,0.00020434298],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.14728806e-7,0.0000065955196,0.0000024857295,0.21578299,0.00013917961,0.0000027602596,0.00000486899,0.000886804,2.6777923e-7,0.00031621027,0.0026914522,0.78016627],"study_design_scores_gemma":[0.000029474375,0.000007672891,0.0000011236099,0.04213883,0.00090155326,0.000005627568,0.0000014541656,0.0091365455,0.0000013461461,0.000012865137,0.9474931,0.0002704024],"about_ca_topic_score_codex":0.00006375392,"about_ca_topic_score_gemma":0.000040252187,"teacher_disagreement_score":0.9448016,"about_ca_system_score_codex":0.00017465136,"about_ca_system_score_gemma":0.000022834682,"threshold_uncertainty_score":0.99990916},"labels":[],"label_agreement":null},{"id":"W4401698253","doi":"10.3390/en17164128","title":"A Comprehensive Review of the Current Status of Smart Grid Technologies for Renewable Energies Integration and Future Trends: The Role of Machine Learning and Energy Storage Systems","year":2024,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":136,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Smart grid; Renewable energy; SCADA; Computer science; Systems engineering; Engineering; Sustainability; Environmental economics; Electrical engineering","score_opus":0.013196481047274255,"score_gpt":0.25242176688229373,"score_spread":0.23922528583501948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401698253","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000021356094,0.99756855,0.000058550457,0.000030308369,0.0014094072,0.00026785268,0.00019216575,0.00016501825,0.00028676493],"genre_scores_gemma":[0.00036817938,0.9986037,0.00008537705,0.0000021313595,0.00017096153,0.0003868799,0.00011816147,0.0000659513,0.00019864617],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982684,0.00015237536,0.0007921421,0.0002878795,0.00024456234,0.0002546112],"domain_scores_gemma":[0.99872416,0.00023801326,0.00044334526,0.00046684497,0.00010465397,0.000022990464],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019854041,0.00046147304,0.001432719,0.00031952112,0.00006768847,0.000035180587,0.00032223907,0.00014235816,0.0000019319593],"category_scores_gemma":[0.00005180687,0.00024858574,0.0002958335,0.000591064,0.0001888449,0.00006884941,0.0003453039,0.00030246467,8.927182e-8],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031772563,0.0000075101566,0.0000016905534,0.116894305,0.00036267863,2.997655e-7,0.00008165573,0.026530985,0.000013886769,0.004365744,0.0019368919,0.8498012],"study_design_scores_gemma":[0.00006577774,0.000050260347,0.000001196739,0.038257793,0.0009584569,0.0000046608898,0.0006281716,0.0036604526,0.00016817838,0.00004648114,0.95595676,0.00020182646],"about_ca_topic_score_codex":0.0002802293,"about_ca_topic_score_gemma":0.0000835821,"teacher_disagreement_score":0.95401984,"about_ca_system_score_codex":0.000071599694,"about_ca_system_score_gemma":0.000045196597,"threshold_uncertainty_score":0.99999666},"labels":[],"label_agreement":null},{"id":"W4401865493","doi":"10.1016/j.asoc.2024.112132","title":"Evaluation and benchmarking of research-based microgrid systems using FWZIC-VIKOR approach for sustainable energy management","year":2024,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Benchmarking; Microgrid; VIKOR method; Computer science; Sustainable energy; Energy management; Energy (signal processing); Systems engineering; Artificial intelligence; Renewable energy; Business; Engineering; Electrical engineering","score_opus":0.03404375907266492,"score_gpt":0.2899398550589697,"score_spread":0.25589609598630475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401865493","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024958989,0.0041409587,0.9611185,0.000007655985,0.0003799469,0.0011158198,0.0000016955725,0.00035390604,0.007922495],"genre_scores_gemma":[0.96138585,0.000020275467,0.037967127,0.0000081416565,0.00029883516,0.00017804932,0.00003925163,0.00006937767,0.00003306824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980501,0.000057409077,0.00035779306,0.00041132866,0.00057224464,0.00055114785],"domain_scores_gemma":[0.99922115,0.0002469503,0.00004113363,0.0002486137,0.00018799868,0.000054183132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035086186,0.00018851072,0.00022367343,0.0005253716,0.0002043908,0.00021869238,0.00016193939,0.000071667695,0.0000021509316],"category_scores_gemma":[0.000015804551,0.00020965638,0.0000485935,0.00060480327,0.00007266066,0.00007050214,0.00017859014,0.00012476502,4.838215e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006680417,0.000016422226,0.000008899939,0.0036282635,0.00017942392,0.0000049661608,0.0001076978,0.9133842,0.0010393051,0.048251737,0.00053564925,0.032836765],"study_design_scores_gemma":[0.00036923288,0.000019219058,0.000023067674,0.0002196501,0.00011732309,0.0000018855287,0.00094987603,0.9897257,0.0010423062,0.0004859133,0.0068539632,0.0001918832],"about_ca_topic_score_codex":0.000073842115,"about_ca_topic_score_gemma":9.3388405e-7,"teacher_disagreement_score":0.9364269,"about_ca_system_score_codex":0.0004169119,"about_ca_system_score_gemma":0.000039860515,"threshold_uncertainty_score":0.85495394},"labels":[],"label_agreement":null},{"id":"W4401880345","doi":"10.1109/icps59941.2024.10639994","title":"Non-Intrusive Load Monitoring-based Fuzzy Actor-Critic Reinforcement Learning Home Energy Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada; Carleton University","funders":"","keywords":"Reinforcement learning; Computer science; Energy management; Fuzzy logic; Load management; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Psychology; Social psychology; Electrical engineering","score_opus":0.005658647664936576,"score_gpt":0.2025508729208804,"score_spread":0.19689222525594383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401880345","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026307326,0.0019140115,0.45308876,0.0003601124,0.012723493,0.0005305575,0.000002361901,0.006259193,0.4988142],"genre_scores_gemma":[0.9843758,0.00034589565,0.0009440889,0.00008881853,0.0006164849,0.00020418689,0.000020784762,0.00011776412,0.013286218],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799657,0.000015951267,0.00036294918,0.00042327997,0.0005824866,0.00061874266],"domain_scores_gemma":[0.99930716,0.00005491983,0.000017556165,0.0004227297,0.000045701327,0.00015196024],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001701557,0.00038107246,0.0002368261,0.0003630186,0.0000950772,0.00024000424,0.00028636077,0.00008398818,0.000408631],"category_scores_gemma":[0.0000056157514,0.0003867274,0.00014027383,0.00045816824,0.000027919028,0.0002208329,0.00014960706,0.00023783202,0.00042245086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070903025,0.000012734768,0.00014019995,0.00047838205,0.0003234794,0.00021179441,0.00008098954,0.9740323,0.00044562534,0.010923519,0.006275143,0.0070687607],"study_design_scores_gemma":[0.00057169335,0.00009539359,0.00097264093,0.00039736636,0.00012902258,0.0000029671726,0.00024519276,0.716907,0.011341226,0.00019169986,0.26838925,0.0007565238],"about_ca_topic_score_codex":0.00009614342,"about_ca_topic_score_gemma":0.000010844957,"teacher_disagreement_score":0.95806843,"about_ca_system_score_codex":0.0008064158,"about_ca_system_score_gemma":0.000026298692,"threshold_uncertainty_score":0.99985844},"labels":[],"label_agreement":null},{"id":"W4401930041","doi":"10.2139/ssrn.4937865","title":"Feasibility Study of Residential House Energy Management Systems Withrenewables and Battery Energy Storage","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Battery (electricity); Energy storage; Energy (signal processing); Energy management; Architectural engineering; Environmental science; Business; Engineering; Physics; Power (physics)","score_opus":0.008595481484608961,"score_gpt":0.20965939879346823,"score_spread":0.20106391730885928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401930041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90072644,0.042797316,0.048018556,0.00005536909,0.005949409,0.00055077416,0.000014787846,0.00064240914,0.001244963],"genre_scores_gemma":[0.9794233,0.01791748,0.000036274927,0.0000082937795,0.00077792496,0.00011045403,0.000009222243,0.00022273233,0.0014943194],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9955761,0.00023760824,0.00095955265,0.00071317615,0.0007527782,0.0017607997],"domain_scores_gemma":[0.9986364,0.000035429963,0.00024787575,0.00086826406,0.00007515396,0.00013686453],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014507663,0.00063063705,0.00076729606,0.00074788084,0.00010975082,0.000303397,0.0006553105,0.00022731758,0.000008255081],"category_scores_gemma":[0.000006343082,0.00062527886,0.00018147983,0.00025702576,0.000053624583,0.00010493323,0.0013118695,0.0018387095,0.0000026383157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008353984,0.0002806359,0.0006938152,0.0010578737,0.0049022995,0.00017171065,0.00024966442,0.9558632,0.000048703034,0.032863323,0.0018630279,0.0019222164],"study_design_scores_gemma":[0.01553057,0.0048173033,0.010633282,0.0060474044,0.011861247,0.0019155423,0.04941929,0.2891027,0.0007206388,0.58701974,0.013768796,0.009163508],"about_ca_topic_score_codex":0.0026188078,"about_ca_topic_score_gemma":0.010210589,"teacher_disagreement_score":0.6667605,"about_ca_system_score_codex":0.0020981836,"about_ca_system_score_gemma":0.00034075457,"threshold_uncertainty_score":0.99961984},"labels":[],"label_agreement":null},{"id":"W4401978678","doi":"10.3390/app14177618","title":"Comparison between Blockchain P2P Energy Trading and Conventional Incentive Mechanisms for Distributed Energy Resources—A Rural Microgrid Use Case Study","year":2024,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Trois-Rivières; Université du Québec à Rimouski","funders":"","keywords":"Blockchain; Microgrid; Incentive; Business; Distributed generation; Environmental economics; Computer science; Economics; Computer security; Microeconomics; Renewable energy; Control (management); Engineering; Electrical engineering","score_opus":0.028269572918911395,"score_gpt":0.26196516590431834,"score_spread":0.23369559298540696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401978678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8162328,0.00033805674,0.18220356,0.00004023068,0.00045046821,0.00022010958,0.000081666774,0.00027957623,0.00015350348],"genre_scores_gemma":[0.99814737,0.000007640689,0.0013460485,0.000021158601,0.00018231645,0.00018013954,0.00004939415,0.000024145093,0.00004180649],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985741,0.00003025944,0.00031780938,0.00040958944,0.00028989726,0.00037834336],"domain_scores_gemma":[0.99940443,0.0003097164,0.000037569313,0.00012709206,0.000017799159,0.000103411105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041740388,0.00022364852,0.00025823864,0.00021511513,0.0003490813,0.00038898623,0.0002107104,0.000054032393,0.000012479122],"category_scores_gemma":[0.000006199518,0.00021086576,0.000055298486,0.0005123928,0.00015603713,0.000115300776,0.00010988936,0.000081412254,0.0000012107173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008950118,0.00058484165,0.015205367,0.0003842136,0.0023540459,0.0009313295,0.008514198,0.27346557,0.021693649,0.5991389,0.018232923,0.05940544],"study_design_scores_gemma":[0.0012953155,0.0003807335,0.0014201233,0.00008589929,0.00030831696,0.000089232344,0.019961994,0.9195572,0.015172213,0.0057077482,0.03505541,0.00096579554],"about_ca_topic_score_codex":0.00033593425,"about_ca_topic_score_gemma":0.00024047303,"teacher_disagreement_score":0.64609164,"about_ca_system_score_codex":0.0000817112,"about_ca_system_score_gemma":0.000014230556,"threshold_uncertainty_score":0.85988563},"labels":[],"label_agreement":null},{"id":"W4402031309","doi":"10.32920/26871388","title":"Smart Rainwater Storage - Development of a Smart Meter Prototype Enabling Local Rule-Based Predictive Real-Time Control and User Interaction","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Rainwater harvesting; Control (management); Computer science; Real-time computing; Smart meter; Model predictive control; Embedded system; Smart grid; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.009502272671452558,"score_gpt":0.21439728881034592,"score_spread":0.20489501613889335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402031309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32342005,0.00023558179,0.6532951,0.00016273028,0.0030608166,0.0042497665,0.00006797664,0.0017197321,0.013788229],"genre_scores_gemma":[0.98256487,0.000022542572,0.014456313,0.00005394645,0.00015996021,0.0015505472,0.00012017698,0.00016107848,0.0009105942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978781,0.000077974815,0.0007062981,0.00060956815,0.00036180177,0.0003662604],"domain_scores_gemma":[0.99914956,0.0000954317,0.000096358985,0.00043588364,0.00010812827,0.00011466503],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051394344,0.0005235642,0.0005927754,0.00049960305,0.000042160784,0.000112791786,0.00019015699,0.00028659476,0.0002560581],"category_scores_gemma":[0.000015984398,0.0004673591,0.00013255059,0.00012376062,0.000060309612,0.000100166704,0.00048456414,0.00058348145,0.00008420565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084165577,0.00012298286,0.00040185623,0.0043179872,0.0031851525,0.000054131666,0.0013251855,0.9733533,0.006952134,0.000116883486,0.0038638455,0.0054648807],"study_design_scores_gemma":[0.0013878455,0.00016837507,0.0013934942,0.0012062446,0.00039930036,0.0000036548374,0.00011383144,0.9437152,0.030772008,0.00016623054,0.01983081,0.0008429752],"about_ca_topic_score_codex":0.00011442581,"about_ca_topic_score_gemma":0.000054586595,"teacher_disagreement_score":0.65914476,"about_ca_system_score_codex":0.00050397497,"about_ca_system_score_gemma":0.000116007264,"threshold_uncertainty_score":0.9997778},"labels":[],"label_agreement":null},{"id":"W4402031359","doi":"10.32920/26871388.v1","title":"Smart Rainwater Storage - Development of a Smart Meter Prototype Enabling Local Rule-Based Predictive Real-Time Control and User Interaction","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Rainwater harvesting; Smart meter; Model predictive control; Metre; Control (management); Computer science; Real-time computing; Environmental science; Smart grid; Engineering; Electrical engineering; Artificial intelligence","score_opus":0.009502272671452558,"score_gpt":0.21439728881034592,"score_spread":0.20489501613889335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402031359","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32342005,0.00023558179,0.6532951,0.00016273028,0.0030608166,0.0042497665,0.00006797664,0.0017197321,0.013788229],"genre_scores_gemma":[0.98256487,0.000022542572,0.014456313,0.00005394645,0.00015996021,0.0015505472,0.00012017698,0.00016107848,0.0009105942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978781,0.000077974815,0.0007062981,0.00060956815,0.00036180177,0.0003662604],"domain_scores_gemma":[0.99914956,0.0000954317,0.000096358985,0.00043588364,0.00010812827,0.00011466503],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051394344,0.0005235642,0.0005927754,0.00049960305,0.000042160784,0.000112791786,0.00019015699,0.00028659476,0.0002560581],"category_scores_gemma":[0.000015984398,0.0004673591,0.00013255059,0.00012376062,0.000060309612,0.000100166704,0.00048456414,0.00058348145,0.00008420565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084165577,0.00012298286,0.00040185623,0.0043179872,0.0031851525,0.000054131666,0.0013251855,0.9733533,0.006952134,0.000116883486,0.0038638455,0.0054648807],"study_design_scores_gemma":[0.0013878455,0.00016837507,0.0013934942,0.0012062446,0.00039930036,0.0000036548374,0.00011383144,0.9437152,0.030772008,0.00016623054,0.01983081,0.0008429752],"about_ca_topic_score_codex":0.00011442581,"about_ca_topic_score_gemma":0.000054586595,"teacher_disagreement_score":0.65914476,"about_ca_system_score_codex":0.00050397497,"about_ca_system_score_gemma":0.000116007264,"threshold_uncertainty_score":0.9997778},"labels":[],"label_agreement":null},{"id":"W4402039345","doi":"10.1016/j.asoc.2024.112183","title":"The adaptive consensus reaching process with the ER-PSO interaction mechanism and its application in public charging stations evaluation","year":2024,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Mechanism (biology); Process (computing); Distributed computing","score_opus":0.0217486425052865,"score_gpt":0.25390547716354134,"score_spread":0.23215683465825485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402039345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54924554,0.00039755076,0.44379875,0.001066949,0.0002720386,0.0010826122,0.0000011887753,0.000507541,0.0036278598],"genre_scores_gemma":[0.9991438,0.000010261697,0.0004108519,0.00003417234,0.00009250021,0.00025897173,0.000011616348,0.000032407366,0.0000054109814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990802,0.00004726497,0.00018730243,0.000234617,0.00024057548,0.00021006877],"domain_scores_gemma":[0.99927133,0.00046749433,0.000048751335,0.00013117769,0.000056814893,0.000024421328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010697102,0.00013186042,0.00008197579,0.00011082495,0.00033590212,0.00021852549,0.000106644104,0.000030145946,0.0000010006393],"category_scores_gemma":[0.000025027728,0.00009256067,0.000011405177,0.000384692,0.000021094032,0.00010052824,0.000044244985,0.00027124598,0.0000068578024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071578384,0.000005743161,0.000013541613,0.000053049454,0.00006384991,8.9514793e-7,0.0033682163,0.7617909,0.00095587224,0.15334073,0.000036471898,0.08036363],"study_design_scores_gemma":[0.00014571803,0.000007150066,0.00028323353,0.00005599615,0.00002613394,0.0000049314267,0.0032679897,0.99238557,0.00031969656,0.002869675,0.0005223413,0.00011157385],"about_ca_topic_score_codex":0.000013692807,"about_ca_topic_score_gemma":0.00011818336,"teacher_disagreement_score":0.44989827,"about_ca_system_score_codex":0.00017965291,"about_ca_system_score_gemma":0.000027763539,"threshold_uncertainty_score":0.37745148},"labels":[],"label_agreement":null},{"id":"W4402054216","doi":"10.3390/s24175619","title":"HYDROSAFE: A Hybrid Deterministic-Probabilistic Model for Synthetic Appliance Profiles Generation","year":2024,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Computer science; Cluster analysis; Dynamic time warping; Image warping; Synthetic data; Algorithm; Data mining; Artificial intelligence","score_opus":0.023029295719829958,"score_gpt":0.2302490800865179,"score_spread":0.20721978436668795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402054216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47390637,0.0004488645,0.5178344,0.00017588011,0.0020390877,0.0009649154,0.00011915783,0.0015192654,0.0029920607],"genre_scores_gemma":[0.9917915,0.000026171298,0.005717629,0.000024089928,0.0003997117,0.0003838971,0.00003919976,0.00007887334,0.0015389418],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912417,0.000008752982,0.00019672117,0.00028938093,0.000119893346,0.0002610888],"domain_scores_gemma":[0.99960834,0.000057254234,0.00001102579,0.00025463075,0.000018682442,0.000050098686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009873803,0.00017341411,0.0001325897,0.000076982455,0.000053658565,0.00008217655,0.00009745184,0.00003645268,0.000012350114],"category_scores_gemma":[0.00003626877,0.0001759572,0.0000665468,0.00008830199,0.000029277204,0.000054742784,0.000019513585,0.00006895791,0.00009084769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026407529,0.0000059106246,7.0939615e-7,0.00035300027,0.000027834312,0.000012415748,0.00006858094,0.98560035,0.002735087,0.0045705982,0.0034305633,0.0031923356],"study_design_scores_gemma":[0.00007134296,0.000014082424,0.0000035460657,0.00004782313,0.000045579098,0.000008373048,0.000006736251,0.98577785,0.0057799676,0.0011513557,0.0068858755,0.00020747085],"about_ca_topic_score_codex":0.00000169241,"about_ca_topic_score_gemma":0.0000068116046,"teacher_disagreement_score":0.51788515,"about_ca_system_score_codex":0.00010109251,"about_ca_system_score_gemma":0.000014921321,"threshold_uncertainty_score":0.7175327},"labels":[],"label_agreement":null},{"id":"W4402093606","doi":"10.52417/ojes.v5i2.619","title":"PHASOR ANALYSIS OF DECENTRALIZED GRID-CONNECTED RESIDENTIAL SOLAR FARM: ADDRESSING NIGERIA ELECTRICITY CAPACITY ISSUES","year":2024,"lang":"en","type":"article","venue":"Open Journal of Engineering Science (ISSN 2734-2115)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Phasor; Grid; Electricity; Environmental economics; Photovoltaic system; Business; Distributed generation; Environmental science; Computer science; Electrical engineering; Engineering; Electric power system; Renewable energy; Geography; Economics; Power (physics)","score_opus":0.025647675746510945,"score_gpt":0.2882234298835387,"score_spread":0.2625757541370278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402093606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9247629,0.0025749207,0.067576,0.00013354907,0.0038552189,0.00025143326,0.000023542976,0.00020626697,0.000616162],"genre_scores_gemma":[0.9891199,0.00042439083,0.010010472,0.000013612322,0.00030738735,0.0000069020575,0.000005297823,0.000055384124,0.000056666628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99666965,0.00006280085,0.001057798,0.00041179956,0.001033738,0.00076418655],"domain_scores_gemma":[0.998552,0.0001554688,0.00021851723,0.00046383622,0.0002970253,0.0003131355],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024155357,0.00036616746,0.0008816055,0.0021580954,0.00016374246,0.0009968845,0.00182977,0.000096295655,0.00028435834],"category_scores_gemma":[0.0005086195,0.00034435993,0.00033736878,0.0061650807,0.0001454662,0.0016492789,0.00022808566,0.0004917855,0.000006208052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002639949,0.000037068698,0.00048564395,0.00011276597,0.001137928,0.000085386615,0.00050851394,0.7908533,0.2041975,0.00034546328,0.0008134721,0.0013965417],"study_design_scores_gemma":[0.0008144274,0.0001492916,0.017124703,0.00068839116,0.0011921064,0.00007642894,0.00016530714,0.70757514,0.26396027,0.00006561014,0.007453262,0.0007350349],"about_ca_topic_score_codex":0.00014512282,"about_ca_topic_score_gemma":0.00005785651,"teacher_disagreement_score":0.08327816,"about_ca_system_score_codex":0.00040874945,"about_ca_system_score_gemma":0.00018421067,"threshold_uncertainty_score":0.9999008},"labels":[],"label_agreement":null},{"id":"W4402157456","doi":"10.1109/icc51166.2024.10622296","title":"Modeling Advanced Metering Infrastructure with Bidirectional Traffic in Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Metering mode; Computer science; Smart grid; Computer network; Engineering; Electrical engineering","score_opus":0.005082309820022651,"score_gpt":0.18771717006601252,"score_spread":0.18263486024598988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402157456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86963195,0.00032542011,0.1205664,0.00003618519,0.00097384927,0.00007669692,0.0000011603186,0.0011051655,0.007283174],"genre_scores_gemma":[0.9908948,0.000048764785,0.008649535,0.000016955828,0.00010190415,0.000035998404,0.0000060260254,0.00004392134,0.00020210365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936706,0.0000052828545,0.00013676692,0.00018590107,0.00010925759,0.0001957117],"domain_scores_gemma":[0.9998325,0.000013177732,0.000002553581,0.00010966699,0.000007849468,0.000034263325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058508253,0.00013936944,0.0001039281,0.00023121589,0.000017283628,0.00005047433,0.0000682554,0.00003619936,0.00010029015],"category_scores_gemma":[0.000002283276,0.00011801674,0.000026307856,0.00037083132,0.0000070753945,0.00019969944,0.000021407983,0.00015138203,0.000014362446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044780786,0.000002297819,0.00003874018,0.000059431914,0.00003844283,0.00001893086,0.00006435858,0.9884807,0.00046932473,0.00035787188,0.00018786952,0.010277576],"study_design_scores_gemma":[0.00013449254,0.00001396582,0.00030760193,0.000073007526,0.0000073336473,0.000010182716,0.000054231336,0.99465847,0.00029539646,0.000066496876,0.004218521,0.00016031081],"about_ca_topic_score_codex":0.00001480491,"about_ca_topic_score_gemma":0.0002208975,"teacher_disagreement_score":0.12126284,"about_ca_system_score_codex":0.00012929834,"about_ca_system_score_gemma":0.000010156141,"threshold_uncertainty_score":0.4812583},"labels":[],"label_agreement":null},{"id":"W4402264789","doi":"10.1109/tqcebt59414.2024.10545306","title":"Utilizing Deep Reinforcement Learning for Energy Trading in Microgrids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Reinforcement learning; Computer science; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Structural engineering; Mathematics","score_opus":0.012375240121973708,"score_gpt":0.21676992629815253,"score_spread":0.2043946861761788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402264789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0097781345,0.0019667826,0.9002999,0.00008230233,0.001360646,0.00014120876,1.599041e-7,0.0012150187,0.085155815],"genre_scores_gemma":[0.9959766,0.00016578307,0.0016882034,0.000049627393,0.00017637268,0.0001154614,0.00001429391,0.000053869622,0.0017597866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916756,0.000007238799,0.00022728785,0.00018290758,0.00008975683,0.00032526633],"domain_scores_gemma":[0.9997798,0.00006637825,0.000006156924,0.00010180663,0.0000062744043,0.000039584193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001588562,0.00013992506,0.000118193086,0.00025589115,0.000032875705,0.000083099265,0.00009315926,0.00004488736,0.000120838326],"category_scores_gemma":[0.000008340445,0.00014494086,0.00006628981,0.00024494462,0.00000739955,0.00013156228,0.000030697007,0.000101313366,0.000011487043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002310419,0.0000030923277,0.000049897386,0.00013625472,0.00004787501,0.000010346428,0.00017934921,0.944521,0.0018680397,0.026069574,0.0020441702,0.025068104],"study_design_scores_gemma":[0.0001277222,0.000017489434,0.000032860797,0.000054174627,0.000008451821,0.0000015794733,0.00016312086,0.79232913,0.005031142,0.00011693413,0.20197745,0.00013992692],"about_ca_topic_score_codex":0.000044126376,"about_ca_topic_score_gemma":0.0000895948,"teacher_disagreement_score":0.9861985,"about_ca_system_score_codex":0.00018058538,"about_ca_system_score_gemma":0.0000057031766,"threshold_uncertainty_score":0.5910517},"labels":[],"label_agreement":null},{"id":"W4402303173","doi":"10.1109/icesep62218.2024.10651950","title":"A Peer-to-Peer Trading Mechanism Considering Preferences: A Two-Stage Game Theory Approach","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Game theory; Peer-to-peer; Computer science; Mechanism (biology); Peer review; Microeconomics; Distributed computing; Economics","score_opus":0.029513192144324213,"score_gpt":0.23822780281830455,"score_spread":0.20871461067398034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402303173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01917598,0.00015289364,0.65577644,0.00022267312,0.0011103832,0.00026364127,0.000007331554,0.0022432392,0.3210474],"genre_scores_gemma":[0.952156,0.0000079220135,0.015541308,0.0001551657,0.00021624615,0.00015638387,0.000010964601,0.00009374199,0.031662248],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836606,0.000035948357,0.00025137348,0.0004075831,0.0004922407,0.0004467727],"domain_scores_gemma":[0.9993411,0.00011329975,0.000009207051,0.00034789785,0.000039548944,0.00014899852],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007432381,0.00027874293,0.0002178859,0.00029102195,0.000040931212,0.00027751643,0.00024467913,0.00006532223,0.0006192755],"category_scores_gemma":[0.000053624946,0.00025269573,0.000086372485,0.00035448698,0.000018931174,0.00020229368,0.00010978606,0.00023215686,0.0002166326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044174476,0.000015328089,0.0000059647296,0.000288644,0.00025238414,0.00004993154,0.0024785176,0.33911544,0.0021088794,0.6436572,0.008271697,0.003751605],"study_design_scores_gemma":[0.00020793431,0.00002632795,0.000015567,0.00008714191,0.000049733084,0.000014609614,0.0015161601,0.8861874,0.006733499,0.016601272,0.08807762,0.00048277975],"about_ca_topic_score_codex":0.00002803038,"about_ca_topic_score_gemma":0.000019405807,"teacher_disagreement_score":0.93298006,"about_ca_system_score_codex":0.00012891357,"about_ca_system_score_gemma":0.000017521137,"threshold_uncertainty_score":0.99999255},"labels":[],"label_agreement":null},{"id":"W4402304588","doi":"10.3233/faia240757","title":"Winning the 2023 CityLearn Challenge: A Community-Based Hierarchical Energy Systems Coordination Algorithm","year":2024,"lang":"en","type":"book-chapter","venue":"Frontiers in artificial intelligence and applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Computer science; Energy (signal processing); Algorithm; Distributed computing; Mathematics","score_opus":0.031809150053077946,"score_gpt":0.2417977943806637,"score_spread":0.20998864432758577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402304588","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000026268322,0.0038833192,0.90365684,0.00062863634,0.0010212223,0.00043499412,0.000059293634,0.00021820773,0.09009486],"genre_scores_gemma":[0.3341321,0.02694165,0.031343404,0.0016055512,0.013962721,0.017064145,0.005195272,0.0019625628,0.5677926],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875706,0.00004238678,0.00046476154,0.0002869166,0.00021263763,0.00023621655],"domain_scores_gemma":[0.9992148,0.00013257442,0.000058043523,0.00048590885,0.000043899003,0.000064742024],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035864793,0.00029017395,0.00028203247,0.00037354804,0.0002693072,0.00015654485,0.00037985313,0.00023858946,0.000017697897],"category_scores_gemma":[0.000005086693,0.00027495748,0.00007608463,0.00020331444,0.0002313676,0.000050800703,0.000102461665,0.00095077377,0.000044057902],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027529422,0.000024397152,0.000001042695,0.00014610025,0.00009053967,0.0000042283114,0.00014886845,0.16094555,0.000003181982,0.59250456,0.0055780965,0.24055071],"study_design_scores_gemma":[0.000010114373,0.000014966471,6.5609726e-7,0.0001252268,0.000038058617,9.4851174e-7,0.0003027512,0.44601274,0.000021693615,0.10236551,0.45091036,0.00019697688],"about_ca_topic_score_codex":0.00013377189,"about_ca_topic_score_gemma":0.000120264274,"teacher_disagreement_score":0.87231344,"about_ca_system_score_codex":0.00016086538,"about_ca_system_score_gemma":0.000022553526,"threshold_uncertainty_score":0.99997026},"labels":[],"label_agreement":null},{"id":"W4402474043","doi":"10.1109/ccece59415.2024.10667119","title":"Constrained Deep Reinforcement Learning for Energy Management of Community Multi-Energy Systems","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Ministry of Higher Education","keywords":"Reinforcement learning; Computer science; Energy management; Energy (signal processing); Artificial intelligence; Human–computer interaction; Physics","score_opus":0.019058729411204674,"score_gpt":0.22581802093211809,"score_spread":0.2067592915209134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474043","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005893597,0.00091033516,0.950381,0.000019909297,0.0011432375,0.00016636752,0.0000015811743,0.0008061992,0.04598201],"genre_scores_gemma":[0.98788273,0.00031851153,0.0024410165,0.00002993293,0.00006834745,0.00028284892,0.00008199338,0.00006346694,0.0088311685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885935,0.00005438497,0.00043674157,0.00013932578,0.00019193845,0.00031828362],"domain_scores_gemma":[0.99939555,0.00011723881,0.00003180298,0.00034696146,0.000041032963,0.000067398025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031083162,0.00022413298,0.00024490347,0.00019664397,0.00009818823,0.0000692188,0.0002446683,0.00006503005,0.00005950313],"category_scores_gemma":[0.0000048651586,0.00022012,0.00011386975,0.00022554309,0.000040476672,0.000099928686,0.00013138562,0.00012871262,0.0000063354214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004638571,0.000017775707,0.000004181511,0.0010815202,0.0005421447,0.000005943684,0.00010160596,0.79866105,0.00014549919,0.19073784,0.0017588303,0.0069389595],"study_design_scores_gemma":[0.0004285664,0.000059137335,0.000028041233,0.00015973531,0.00007034623,0.000002276709,0.0010617739,0.88997203,0.0010164048,0.000056596156,0.106939405,0.0002057066],"about_ca_topic_score_codex":0.0004700066,"about_ca_topic_score_gemma":0.00007294902,"teacher_disagreement_score":0.98729336,"about_ca_system_score_codex":0.00013839675,"about_ca_system_score_gemma":0.0000065328436,"threshold_uncertainty_score":0.8976233},"labels":[],"label_agreement":null},{"id":"W4402474262","doi":"10.1109/ccece59415.2024.10667159","title":"A Tight Convex Model of Optimal Gas Flow Problem in Local Networks: Distributed Gas and Power Scheduling Application","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Huawei Technologies (Canada); Université Laval","funders":"Huawei Technologies","keywords":"Computer science; Power flow; Mathematical optimization; Scheduling (production processes); Regular polygon; Distributed computing; Flow (mathematics); Power (physics); Electric power system; Mathematics; Physics; Mechanics","score_opus":0.00493849488592818,"score_gpt":0.1862610113136229,"score_spread":0.18132251642769473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041924585,0.0004591207,0.9556069,0.000107413085,0.00007402841,0.00017386349,0.000005330275,0.00025292824,0.0013958811],"genre_scores_gemma":[0.9693993,0.000082138715,0.030312957,0.00001190119,0.000029556686,0.00006351871,0.00004274866,0.000026077534,0.00003181728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993078,0.0000064545916,0.00021852087,0.00018700834,0.00009344098,0.00018676666],"domain_scores_gemma":[0.99977094,0.000021054608,0.0000098312385,0.00013909308,0.000015415737,0.0000436765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012240918,0.000119884935,0.00013642068,0.000084314204,0.000010907017,0.000029305735,0.000068609756,0.00006319634,0.00002118013],"category_scores_gemma":[0.000002114911,0.000115163384,0.000023823268,0.00024090202,0.000029081777,0.00010457728,0.000053149874,0.00011356372,0.000005938581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049721884,0.000010736832,0.000069400536,0.00009791005,0.000031528336,0.0000025435045,0.00005950578,0.9895575,0.00028906116,0.006822121,0.00044168776,0.0026130248],"study_design_scores_gemma":[0.00015675266,0.000010797057,0.00005513189,0.000064270935,0.000011933227,0.000001360829,0.000037407168,0.99820775,0.0005029155,0.00026877839,0.00056401343,0.000118866024],"about_ca_topic_score_codex":0.00001690848,"about_ca_topic_score_gemma":0.000018698867,"teacher_disagreement_score":0.9274747,"about_ca_system_score_codex":0.00006830014,"about_ca_system_score_gemma":0.000008753729,"threshold_uncertainty_score":0.46962267},"labels":[],"label_agreement":null},{"id":"W4402474475","doi":"10.1109/ccece59415.2024.10667192","title":"Flexibility-Oriented Scheduling of Smart Energy Hubs Considering Integrated Demand Response Programs","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université Laval","funders":"","keywords":"Demand response; Flexibility (engineering); Computer science; Scheduling (production processes); Distributed computing; Embedded system; Engineering; Electrical engineering; Operations management","score_opus":0.016580514618701858,"score_gpt":0.23215971230399768,"score_spread":0.21557919768529582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474475","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7329824,0.0009768739,0.25717613,0.000096246775,0.001277237,0.00015605692,0.0000031899551,0.0021576295,0.005174206],"genre_scores_gemma":[0.9888192,0.00004085589,0.010053118,0.00002674281,0.000056320707,0.00005184293,0.000017132075,0.00006293847,0.0008718657],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986364,0.00007572334,0.00043388747,0.0003177537,0.00020892525,0.0003272748],"domain_scores_gemma":[0.9992779,0.00017058624,0.000018482291,0.00037891642,0.00006247913,0.00009164821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057757896,0.0002310039,0.00024673538,0.00028191923,0.00003382619,0.000070465554,0.00013022209,0.000089138826,0.00013403218],"category_scores_gemma":[0.000090259775,0.00021104264,0.00009925292,0.00070773787,0.00007278711,0.00015831334,0.00008548386,0.00015546955,0.000021027035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004191454,0.00011487435,0.0020277633,0.00082105066,0.0008854266,0.00016452055,0.0006693318,0.8780576,0.04124382,0.047570903,0.0019240011,0.026101558],"study_design_scores_gemma":[0.0002787692,0.000109368506,0.0002531692,0.0003383839,0.000047139354,0.000011625627,0.000376372,0.80349934,0.08448312,0.00029710418,0.10998526,0.000320362],"about_ca_topic_score_codex":0.0001010381,"about_ca_topic_score_gemma":0.0001271349,"teacher_disagreement_score":0.25583678,"about_ca_system_score_codex":0.00012597677,"about_ca_system_score_gemma":0.00004060232,"threshold_uncertainty_score":0.8606069},"labels":[],"label_agreement":null},{"id":"W4402474755","doi":"10.1109/ccece59415.2024.10667165","title":"Influence of Demand Response Suppliers’ Interests on Economic Demand Response","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand response; Response time; On demand; Industrial organization; Derived demand; Business; Microeconomics; Economics; Computer science; Demand curve; Commerce; Engineering; Electrical engineering","score_opus":0.006177141995288851,"score_gpt":0.22163327717794334,"score_spread":0.2154561351826545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402474755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99443656,0.00017353937,0.001666107,0.0002633554,0.00042718308,0.00011617565,0.000009013744,0.00039013076,0.0025179402],"genre_scores_gemma":[0.99815893,0.00004135425,0.00018125187,0.0000697176,0.00004804448,0.000021852984,0.0000018596259,0.000042808566,0.0014341873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907726,0.00008877924,0.00027973694,0.00023598963,0.000099577795,0.00021864823],"domain_scores_gemma":[0.9989895,0.00054005,0.00001427779,0.00037618296,0.000008870246,0.000071074166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007357636,0.0001718486,0.00016447138,0.00033183032,0.000020055068,0.000048119236,0.00019702561,0.00006388976,0.00018901812],"category_scores_gemma":[0.000062204475,0.00016307466,0.000058088026,0.00011775275,0.000043804015,0.00014248835,0.00007484104,0.00011540235,0.00048423896],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012231374,0.000007303236,0.00023853374,0.000083300605,0.00007336228,0.000043241645,0.00022862594,0.97292125,0.01153307,0.0019027342,0.011600979,0.00014445056],"study_design_scores_gemma":[0.0012766944,0.0007514266,0.25547725,0.0006868294,0.00009874865,0.000035096924,0.0002104251,0.3735337,0.22293812,0.0007594838,0.14314638,0.0010858503],"about_ca_topic_score_codex":0.0000137493425,"about_ca_topic_score_gemma":0.000030290617,"teacher_disagreement_score":0.5993876,"about_ca_system_score_codex":0.00020883502,"about_ca_system_score_gemma":0.000029324681,"threshold_uncertainty_score":0.6649991},"labels":[],"label_agreement":null},{"id":"W4402475009","doi":"10.1109/ccece59415.2024.10667294","title":"Ancillary Services in North America: An Overview","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science","score_opus":0.015581927376309512,"score_gpt":0.22739507985344362,"score_spread":0.21181315247713411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402475009","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9435506,0.013471117,0.00069857494,0.000121614416,0.00097024086,0.00009748529,0.0000046213836,0.0016276755,0.03945809],"genre_scores_gemma":[0.9956746,0.0026031176,0.0007360663,0.0004134312,0.00015832252,0.00002295067,0.000034869245,0.000037282025,0.0003193543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951977,0.000005985721,0.00010422866,0.0001318259,0.00008675901,0.00015144533],"domain_scores_gemma":[0.9997706,0.000008609243,0.0000025656523,0.00017693659,0.000003880833,0.000037450565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000035991096,0.00008992715,0.00008297055,0.000094820236,0.0000072186303,0.000043787433,0.000105844505,0.00001806928,0.00014763398],"category_scores_gemma":[4.5987557e-7,0.00008277809,0.000019919888,0.0004292266,0.000004924458,0.00021001276,0.000035545283,0.00006021971,0.00023965935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013775833,0.000028277049,0.007152128,0.0012859218,0.00007346664,0.00018906733,0.0006157053,0.90695053,0.00009719785,0.003326786,0.0055852626,0.07469428],"study_design_scores_gemma":[0.00004681261,0.000012641894,0.05014332,0.00004127783,0.0000063652283,0.0000013077876,0.00011298484,0.5078999,0.0000315447,0.000042844513,0.44150928,0.00015175997],"about_ca_topic_score_codex":0.00015984534,"about_ca_topic_score_gemma":0.004064414,"teacher_disagreement_score":0.43592402,"about_ca_system_score_codex":0.000047950853,"about_ca_system_score_gemma":0.0000034990087,"threshold_uncertainty_score":0.33755925},"labels":[],"label_agreement":null},{"id":"W4402501796","doi":"10.11159/icert24.109","title":"A Peak-Shaving-Oriented Incentive Mechanism for Smart Grids","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Framework Programme; European Commission","keywords":"Incentive; Mechanism (biology); Peaking power plant; Computer science; Smart grid; Electrical engineering; Engineering; Renewable energy; Microeconomics; Physics; Distributed generation; Economics","score_opus":0.009763718695158165,"score_gpt":0.22001556927289517,"score_spread":0.21025185057773702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402501796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68372464,0.0065213284,0.011777385,0.04786171,0.056153897,0.009369255,0.00020192635,0.07142372,0.11296615],"genre_scores_gemma":[0.98924017,0.00012245253,0.0021017378,0.000046859506,0.00009292919,0.00028042292,0.0000017038294,0.00007245763,0.008041285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988009,0.0000014369532,0.00026564338,0.000331023,0.0002511746,0.00034983642],"domain_scores_gemma":[0.99951434,0.00007002642,0.00006447322,0.00023127723,0.00009243657,0.00002742467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011786069,0.00026525004,0.00024254901,0.00047654015,0.000080272046,0.00010333453,0.0008225797,0.000102821,0.000006252311],"category_scores_gemma":[0.00017812167,0.00020061487,0.0001461352,0.00093517103,0.000112388094,0.00019213023,0.00038048005,0.00027932492,0.0000082598735],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002826156,0.000022701828,0.00024765823,0.0004467085,0.00025377652,0.0000015953764,0.00007123249,0.00039942708,0.011611689,0.8737496,0.10240124,0.010766101],"study_design_scores_gemma":[0.00041796893,0.000110803354,0.00011574946,0.0012321341,0.00012019692,0.0000025939971,0.0005815633,0.023065042,0.74370563,0.067043185,0.16319652,0.00040860486],"about_ca_topic_score_codex":0.0000074438126,"about_ca_topic_score_gemma":0.00002431017,"teacher_disagreement_score":0.8067064,"about_ca_system_score_codex":0.0001467825,"about_ca_system_score_gemma":0.000013946191,"threshold_uncertainty_score":0.8180837},"labels":[],"label_agreement":null},{"id":"W4402511722","doi":"10.1016/j.scs.2024.105813","title":"Energy storage enabling renewable energy communities: An urban context-aware approach and case study using agent-based modeling and optimization","year":2024,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Khalifa University of Science, Technology and Research","keywords":"Renewable energy; Context (archaeology); Environmental science; Energy storage; Environmental economics; Energy (signal processing); Computer science; Civil engineering; Architectural engineering; Environmental resource management; Engineering; Economics; Geography; Power (physics)","score_opus":0.020390810894999774,"score_gpt":0.21948733502001377,"score_spread":0.199096524125014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402511722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39104816,0.0052165086,0.60303783,0.000006217975,0.00009104998,0.00013188583,0.0000064777046,0.00028291732,0.00017893416],"genre_scores_gemma":[0.99617577,0.00079063734,0.001965126,0.0000959563,0.00012008233,0.00006267607,0.00005351921,0.00008277755,0.0006534577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987867,0.00008954301,0.00023964475,0.0003004661,0.00014895393,0.00043472063],"domain_scores_gemma":[0.9994562,0.00005889624,0.000023305,0.00024965647,0.00008938924,0.00012250997],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034144506,0.00028659953,0.00026639662,0.00013570275,0.0007196754,0.0006030852,0.0000789688,0.00011172449,0.0000073440697],"category_scores_gemma":[0.0000023984283,0.00030860977,0.000051503812,0.00023371748,0.00009871972,0.0005652308,0.0001590253,0.0001398654,1.2226134e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004433358,0.000031370404,0.00006259491,0.000753481,0.00014557748,0.00021508735,0.021084165,0.9761037,0.0000028039497,0.0010417136,0.00023698491,0.0003180825],"study_design_scores_gemma":[0.00026631786,0.00004170634,4.607069e-7,0.000029622222,0.000056925273,0.000034922687,0.4210075,0.5776331,0.000005191538,0.00003867961,0.00068994745,0.00019563129],"about_ca_topic_score_codex":0.033669382,"about_ca_topic_score_gemma":0.00036384384,"teacher_disagreement_score":0.6051276,"about_ca_system_score_codex":0.00023972851,"about_ca_system_score_gemma":0.000051182364,"threshold_uncertainty_score":0.9999366},"labels":[],"label_agreement":null},{"id":"W4402562281","doi":"10.1016/j.epsr.2024.111057","title":"Energy management for smart residential homes: A real-time fuzzy logic approach","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Qatar National Research Fund; Qatar Foundation","keywords":"Fuzzy logic; Energy (signal processing); Computer science; Energy management; Architectural engineering; Engineering; Artificial intelligence; Mathematics; Statistics","score_opus":0.0242373860998588,"score_gpt":0.2798577246842726,"score_spread":0.2556203385844138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402562281","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037322026,0.024825908,0.24800809,0.0002060046,0.0050615836,0.0029547014,0.00002652269,0.0032771295,0.71190786],"genre_scores_gemma":[0.9186668,0.0023407387,0.0007192402,0.000013360392,0.000794028,0.0031189434,0.00009127777,0.0002588741,0.07399676],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99575734,0.0002557124,0.0005152681,0.0007685968,0.0012493993,0.0014536587],"domain_scores_gemma":[0.99864805,0.00022061958,0.000022776769,0.00076988485,0.00014041176,0.00019828325],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0023802724,0.00034031286,0.00039178747,0.0018248289,0.00019976855,0.0006051879,0.0007018071,0.00017912737,0.000056229648],"category_scores_gemma":[0.000028728397,0.00032306692,0.00017175947,0.0025016717,0.000041659412,0.00019489473,0.00020359342,0.0003624156,0.00041830074],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007510445,0.00011290098,0.0000068659047,0.0030445075,0.0013437008,0.00034021196,0.0001936184,0.03312994,0.0045809085,0.14580739,0.8067615,0.0046033487],"study_design_scores_gemma":[0.00053099054,0.00028474117,0.00012068564,0.00021582888,0.000058299396,0.00004555657,0.00015904382,0.5157699,0.00059067144,0.0013517749,0.48028475,0.0005877637],"about_ca_topic_score_codex":0.00041888328,"about_ca_topic_score_gemma":0.000006484664,"teacher_disagreement_score":0.9149346,"about_ca_system_score_codex":0.0008155414,"about_ca_system_score_gemma":0.00006702564,"threshold_uncertainty_score":0.99992216},"labels":[],"label_agreement":null},{"id":"W4402570352","doi":"10.1109/tia.2024.3462667","title":"Data-Driven Energy and Reserve Management of Prosumers Under Multi-Uncertainties","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Hong Kong Polytechnic University","keywords":"Energy management; Computer science; Energy (signal processing); Environmental economics; Economics; Physics","score_opus":0.044995304921983316,"score_gpt":0.2756914651585082,"score_spread":0.23069616023652487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402570352","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020854736,0.0002624047,0.9940946,0.0002676562,0.00030459618,0.00028706406,0.00031592156,0.00042700136,0.0019552787],"genre_scores_gemma":[0.99119836,0.00057189143,0.0046654176,0.000025853273,0.000048707607,0.0009284959,0.000056716304,0.00004927104,0.0024552979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991202,0.000013353745,0.0002293832,0.00031878703,0.00015020794,0.00016811618],"domain_scores_gemma":[0.9991776,0.00003891091,0.000016758951,0.0006829205,0.000019686862,0.000064165055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070086484,0.00015383647,0.00011474265,0.00018464834,0.00009078667,0.000045649467,0.00028362076,0.00014430248,0.00006128719],"category_scores_gemma":[2.0713871e-7,0.00016387904,0.000034186465,0.00045823588,0.00008502523,0.00017365084,0.000008510596,0.00026450885,0.000010916937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031951686,0.00007376797,0.0000047238186,0.00026126302,0.00046096646,0.0000027123535,0.00003537455,0.96503544,0.00025609692,0.0083823595,0.0028026584,0.02268143],"study_design_scores_gemma":[0.00038095418,0.000029627507,0.0002774745,0.0002389183,0.0003426216,0.000007030185,0.0009819044,0.78986186,0.0061836187,0.00037244093,0.20090798,0.00041555104],"about_ca_topic_score_codex":0.00006865526,"about_ca_topic_score_gemma":0.00010417322,"teacher_disagreement_score":0.9894292,"about_ca_system_score_codex":0.00007380955,"about_ca_system_score_gemma":0.000013328538,"threshold_uncertainty_score":0.66827935},"labels":[],"label_agreement":null},{"id":"W4402627328","doi":"10.1109/tie.2024.3451111","title":"A Control for Preventing False Tripping of Grid-Tied Renewable Systems With Increased Solar Penetration and Fluctuating Load Demand","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Tripping; Renewable energy; Penetration (warfare); Grid; Grid parity; Engineering; Computer science; Automotive engineering; Electrical engineering; Reliability engineering; Distributed generation; Environmental science; Operations research; Geology","score_opus":0.013838227946434684,"score_gpt":0.20732961072397976,"score_spread":0.19349138277754507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402627328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1100363,0.0009325835,0.8867564,0.000028666733,0.000942585,0.000920423,0.000036056863,0.00025573908,0.00009122919],"genre_scores_gemma":[0.9988822,0.00010032497,0.00030436157,0.000006594063,0.00030041498,0.00026404829,0.000008580865,0.000055411107,0.00007810048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869394,0.000057762496,0.00041000717,0.00025379975,0.00023573246,0.000348767],"domain_scores_gemma":[0.9993884,0.00027211223,0.00006238149,0.00015672714,0.00006125595,0.000059116952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061746663,0.00020777863,0.00029104634,0.00019610453,0.00013624677,0.00012099772,0.00007625225,0.00015972987,0.0000050186854],"category_scores_gemma":[0.000019041554,0.00020369643,0.0000723476,0.0003396136,0.00002123552,0.00020803256,7.1716477e-7,0.00030542287,6.525084e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001726345,0.000027794973,0.0000036867182,0.00025387193,0.00043954692,0.0000014000534,0.00007181282,0.98205024,0.012848275,0.000104185514,0.00017793692,0.0038486342],"study_design_scores_gemma":[0.003031435,0.0005897506,0.000002793659,0.00043553737,0.0004439366,0.0000100236,0.00007992817,0.93878144,0.053123746,0.000033891643,0.0032143255,0.0002532037],"about_ca_topic_score_codex":0.0002477715,"about_ca_topic_score_gemma":0.00026554146,"teacher_disagreement_score":0.88884586,"about_ca_system_score_codex":0.000333556,"about_ca_system_score_gemma":0.00020384576,"threshold_uncertainty_score":0.8306499},"labels":[],"label_agreement":null},{"id":"W4402690797","doi":"10.1016/j.epsr.2024.111059","title":"Modeling of heat pumps load profiles for power systems integration","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"Natural Resources Canada","keywords":"Electric power system; Heat pump; Heat load; System integration; Power (physics); Computer science; Engineering; Electrical engineering; Environmental science; Mechanical engineering; Heat exchanger; Physics; Thermodynamics","score_opus":0.03847731750826301,"score_gpt":0.30531394807926454,"score_spread":0.26683663057100154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402690797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08891151,0.061103404,0.8129727,0.00010403447,0.007283773,0.0035618255,0.000037020243,0.0010438166,0.024981888],"genre_scores_gemma":[0.99638337,0.00019625547,0.00005619189,0.0000016449334,0.00018681654,0.0009728641,0.00001669781,0.00010279109,0.002083368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968936,0.00016892065,0.0005976368,0.0004129424,0.0011431803,0.0007837191],"domain_scores_gemma":[0.99864614,0.00021993981,0.000015686615,0.00047371566,0.00053758157,0.00010692709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026982315,0.00023082085,0.0003575451,0.0009672977,0.00009596274,0.00031552446,0.000360284,0.00016176885,0.000014585285],"category_scores_gemma":[0.00016406534,0.00020434456,0.00011131631,0.0014644143,0.000022331464,0.00023945993,0.00005895596,0.0004327096,0.000078011486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026209267,0.000026240099,0.00000703602,0.0016332892,0.00021729004,0.00001222468,0.00040608592,0.9545529,0.016117137,0.010166617,0.016571686,0.00026330835],"study_design_scores_gemma":[0.00015441395,0.00017945362,0.000006393696,0.00055771443,0.000011943498,0.0000115597895,0.00036425944,0.9817731,0.0029153177,0.000039844406,0.013796971,0.00018903834],"about_ca_topic_score_codex":0.0011426124,"about_ca_topic_score_gemma":0.00001417456,"teacher_disagreement_score":0.90747184,"about_ca_system_score_codex":0.00094006077,"about_ca_system_score_gemma":0.00017629912,"threshold_uncertainty_score":0.83329296},"labels":[],"label_agreement":null},{"id":"W4402764848","doi":"10.1115/es2024-130538","title":"Enhancing Battery Storage Energy Arbitrage With Deep Reinforcement Learning and Time-Series Forecasting","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"McGill University","keywords":"Reinforcement learning; Arbitrage; Revenue; Electricity; Computer science; Battery (electricity); Electricity price forecasting; Deep learning; Artificial intelligence; Electricity market; Econometrics; Economics; Engineering; Finance; Electrical engineering","score_opus":0.006391332218540322,"score_gpt":0.1775917264410149,"score_spread":0.17120039422247457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402764848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028516931,0.0019362263,0.78245294,0.00011584575,0.0015620894,0.00033162386,0.0000020485866,0.0026655742,0.18241672],"genre_scores_gemma":[0.9714973,0.00032322083,0.008545407,0.000089047026,0.0005887901,0.0002139551,0.00010551262,0.00027600856,0.018360786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981167,0.000029024342,0.0004387798,0.0005847075,0.00032055454,0.00051027094],"domain_scores_gemma":[0.99935555,0.00006569744,0.000073985095,0.0003499372,0.000032920743,0.00012192188],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002341441,0.00058777386,0.00045452802,0.00031533404,0.00010100907,0.00031919635,0.00017872186,0.00019184536,0.00033524504],"category_scores_gemma":[0.000015309412,0.00054102455,0.00008035847,0.00014894143,0.000045691748,0.00013056053,0.0012186966,0.00095406827,0.000039413248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010661572,0.000003121692,0.000026141857,0.0010837659,0.00037592044,0.00014232841,0.0002947099,0.9948498,0.00049236044,0.0010831176,0.0004849772,0.0011530832],"study_design_scores_gemma":[0.00015129453,0.00008093872,0.000017344915,0.0008436375,0.00014572054,0.000035691977,0.00018417863,0.98242605,0.0060750144,0.00035526027,0.008899595,0.0007852592],"about_ca_topic_score_codex":0.000095043455,"about_ca_topic_score_gemma":0.0001958824,"teacher_disagreement_score":0.94298035,"about_ca_system_score_codex":0.00022558698,"about_ca_system_score_gemma":0.00003162605,"threshold_uncertainty_score":0.9997041},"labels":[],"label_agreement":null},{"id":"W4402980902","doi":"10.1109/otcon60325.2024.10687601","title":"Aggregative Dynamics and Revenue Structuring in Energy Internet User-Prosumer Ecosystems","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Prosumer; Structuring; The Internet; Revenue; Computer science; Ecosystem; Business; Environmental economics; World Wide Web; Ecology; Economics; Renewable energy","score_opus":0.004052710805536301,"score_gpt":0.18035187243193537,"score_spread":0.17629916162639908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402980902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9391906,0.0025563024,0.040468946,0.00011928807,0.0024968532,0.00012796426,0.000022922724,0.00058392994,0.014433139],"genre_scores_gemma":[0.9955066,0.0001603729,0.00029800416,0.0000139806425,0.000084013445,0.000021852064,0.000010264133,0.000034306355,0.0038706288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994544,0.000012431607,0.00014731372,0.00016659194,0.000067967456,0.0001513176],"domain_scores_gemma":[0.9998201,0.00002446205,0.0000071052523,0.00011312643,0.0000045986394,0.00003061514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006432972,0.00011493417,0.00010724714,0.00014902728,0.0000072267517,0.00007342537,0.00007311324,0.000041913554,0.000044214277],"category_scores_gemma":[0.000003765889,0.0001107562,0.00001805034,0.00013969369,0.00001079462,0.00012476016,0.00006664235,0.00008637172,0.000010312814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008648489,0.000011717343,0.0070349965,0.0012623875,0.0004220907,0.00034135533,0.0014256636,0.52071464,0.00056887156,0.3767283,0.01952105,0.07196028],"study_design_scores_gemma":[0.00008384593,0.000007221863,0.000883412,0.00019230906,0.0000059885783,0.00000773675,0.000070657,0.96585304,0.0015457283,0.00043539988,0.030773101,0.00014156217],"about_ca_topic_score_codex":0.0006292986,"about_ca_topic_score_gemma":0.010322342,"teacher_disagreement_score":0.4451384,"about_ca_system_score_codex":0.0001728644,"about_ca_system_score_gemma":0.0000033218375,"threshold_uncertainty_score":0.5760109},"labels":[],"label_agreement":null},{"id":"W4403022224","doi":"10.1109/tnnls.2024.3432137","title":"Boosting Communication Efficiency in Federated Learning for Multiagent-Based Multimicrogrid Energy Management","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Neural Networks and Learning Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"National Natural Science Foundation of China","keywords":"Boosting (machine learning); Computer science; Efficient energy use; Artificial intelligence; Knowledge management; Engineering","score_opus":0.010144344800803073,"score_gpt":0.2133974164485712,"score_spread":0.20325307164776812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403022224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02905475,0.0024989042,0.9656193,0.000043761378,0.0014033468,0.00036919536,0.0000012784212,0.0008181879,0.00019124942],"genre_scores_gemma":[0.9982469,0.00042006606,0.00028724497,0.000024722225,0.00007884903,0.00032382013,0.000023244984,0.0000746375,0.0005205261],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986672,0.00019063939,0.0003519951,0.00031256024,0.00012272985,0.00035490288],"domain_scores_gemma":[0.9993775,0.00036790682,0.000035468234,0.00013945297,0.000021508073,0.000058170102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036425024,0.00023467021,0.00020359122,0.00028747192,0.00041974915,0.0003033712,0.00010160739,0.00009429164,0.0000047871695],"category_scores_gemma":[0.0000033572155,0.00024407942,0.00007619605,0.0003721569,0.000024676256,0.00010833913,0.0000026580074,0.00057064515,0.000002257052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018205075,0.000023084922,0.000032270724,0.00025537162,0.00005943302,0.000010892553,0.000083296116,0.94964355,0.00010288221,0.00003195276,0.00007806647,0.049660977],"study_design_scores_gemma":[0.0005042598,0.00007400917,0.00006518098,0.0004696411,0.000037140017,0.000004411857,0.00021346769,0.9900288,0.00010694628,3.2193202e-7,0.008259328,0.00023648328],"about_ca_topic_score_codex":0.00015381562,"about_ca_topic_score_gemma":0.000059312075,"teacher_disagreement_score":0.96919215,"about_ca_system_score_codex":0.00011142665,"about_ca_system_score_gemma":0.0000037230286,"threshold_uncertainty_score":0.995327},"labels":[],"label_agreement":null},{"id":"W4403125763","doi":"10.1109/sest61601.2024.10694409","title":"Clustering Alternatives in Market-Clearing for Transactive Energy Flexibility Spot Markets","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Clearing; Cluster analysis; Flexibility (engineering); Transactive memory; Market clearing; Spot contract; Computer science; Business; Artificial intelligence; Economics; Microeconomics; Futures contract; Knowledge management; Finance","score_opus":0.014068320526054133,"score_gpt":0.23653380100452961,"score_spread":0.22246548047847547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403125763","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060528334,0.00044130982,0.7971489,0.00010816592,0.0014816424,0.00023419426,0.00000854357,0.000903408,0.1391455],"genre_scores_gemma":[0.9933584,0.00011346168,0.003229988,0.000033106884,0.00013845584,0.00014157004,0.0000036663075,0.00006467039,0.0029167037],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989457,0.00002696603,0.00024203343,0.00033692396,0.00012102877,0.00032734236],"domain_scores_gemma":[0.9995465,0.00018492868,0.000007324561,0.0001985929,0.000011008125,0.000051595933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003321022,0.00019130539,0.00017236348,0.00022809948,0.000023998726,0.00007759217,0.00015413239,0.000053413827,0.00035140838],"category_scores_gemma":[0.000012405874,0.00019476596,0.00008996067,0.00020589324,0.000019678877,0.0002591444,0.000040253748,0.00010342898,0.0000062241265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017363101,0.000046055753,0.00017261138,0.00092934695,0.0003398324,0.00006182966,0.000678109,0.8157856,0.0020143236,0.0048500043,0.0025005222,0.17244817],"study_design_scores_gemma":[0.00026092285,0.000015785754,0.0047646663,0.00009950391,0.000010982961,0.0000019239124,0.00008231018,0.9645695,0.005427057,0.00058973016,0.023949146,0.00022845478],"about_ca_topic_score_codex":0.00011799359,"about_ca_topic_score_gemma":0.00053737045,"teacher_disagreement_score":0.93283004,"about_ca_system_score_codex":0.000243502,"about_ca_system_score_gemma":0.000008064687,"threshold_uncertainty_score":0.79423255},"labels":[],"label_agreement":null},{"id":"W4403125793","doi":"10.1109/sest61601.2024.10694534","title":"A Decentralized Business Model for Integrating Energy Hubs Into Flexibility Markets Within Renewable-Based Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Smart grid; Flexibility (engineering); Renewable energy; Distributed computing; Business model; Grid; Computer science; Industrial organization; Distributed generation; Business; Environmental economics; Engineering; Electrical engineering","score_opus":0.017486019714858407,"score_gpt":0.23868357252532701,"score_spread":0.2211975528104686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403125793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009107391,0.0004024861,0.9799365,0.0003009804,0.0016163607,0.00028677096,0.000026339167,0.002047079,0.006276134],"genre_scores_gemma":[0.8921089,0.000039175928,0.10346754,0.0003167935,0.00019481608,0.00062591874,0.00030413189,0.00016316456,0.0027795665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981864,0.000037282873,0.0005162157,0.00052676874,0.0002503164,0.00048297862],"domain_scores_gemma":[0.9990202,0.000190607,0.000026990203,0.0005117234,0.000118264594,0.00013220232],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005021091,0.00037285677,0.00031185892,0.0002248,0.0000894257,0.00021413396,0.00027831979,0.00012987565,0.00019082583],"category_scores_gemma":[0.00014032098,0.00033219228,0.00014873245,0.00065343204,0.000033766417,0.00025924802,0.0000745717,0.0001170204,0.000009334241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006678763,0.000026005486,0.000026416328,0.00063920213,0.00010326678,0.0000059781996,0.00011459062,0.96329117,0.0012426424,0.006784245,0.024280433,0.0034192838],"study_design_scores_gemma":[0.0005122705,0.000013633067,0.00003503633,0.00021676256,0.00004925852,0.0000012363099,0.000035652945,0.9615498,0.008651034,0.0031070977,0.025440274,0.0003879209],"about_ca_topic_score_codex":0.00069969206,"about_ca_topic_score_gemma":0.0027167618,"teacher_disagreement_score":0.8830015,"about_ca_system_score_codex":0.00036276114,"about_ca_system_score_gemma":0.00012593133,"threshold_uncertainty_score":0.99991304},"labels":[],"label_agreement":null},{"id":"W4403127249","doi":"10.1109/pesgm51994.2024.10688845","title":"Nonparametric Probabilistic Pseudo-Measurement Model for Unbalanced Active Distribution Networks","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Nonparametric statistics; Probabilistic logic; Computer science; Statistical model; Econometrics; Artificial intelligence; Mathematics","score_opus":0.020128459745658467,"score_gpt":0.21906500819810606,"score_spread":0.1989365484524476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403127249","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033854814,0.0002827721,0.9909737,0.000072640956,0.0010334088,0.00056147616,0.000030540476,0.0010251771,0.0026347635],"genre_scores_gemma":[0.9963864,0.000035182897,0.0023822996,0.00002167054,0.0001928183,0.00049814157,0.000107789965,0.000043058488,0.00033264226],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899,0.000007416997,0.0001912215,0.00025584115,0.00022925825,0.0003262435],"domain_scores_gemma":[0.9995912,0.00005996695,0.00001032623,0.00020331299,0.00007314854,0.00006209966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021483736,0.000174797,0.00014046783,0.00008634125,0.000040838906,0.00008073133,0.000110325316,0.00006639828,0.000016468652],"category_scores_gemma":[0.00005287296,0.00016135731,0.00008200791,0.00049017335,0.000014557702,0.00012140109,0.000028360706,0.0001067538,0.000020234427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009263537,0.000016312555,0.0000061039786,0.00014340105,0.00009543105,7.8092495e-7,0.000015847,0.96169484,0.00006459811,0.011760127,0.018326651,0.007866661],"study_design_scores_gemma":[0.0001713911,0.000023739065,0.00024161306,0.000041290677,0.00005454923,6.8141685e-7,0.0000073504903,0.9939744,0.0002375042,0.0012051844,0.003845663,0.00019667041],"about_ca_topic_score_codex":0.0000046536475,"about_ca_topic_score_gemma":0.000016111604,"teacher_disagreement_score":0.9930009,"about_ca_system_score_codex":0.0006958388,"about_ca_system_score_gemma":0.000020366215,"threshold_uncertainty_score":0.657996},"labels":[],"label_agreement":null},{"id":"W4403127377","doi":"10.1109/pesgm51994.2024.10688897","title":"Incorporating System Frequency Dynamics into Real-time Locational Marginal Pricing of Electricity","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Electricity pricing; Econometrics; Computer science; Dynamics (music); Electricity market; Economics; Engineering; Electrical engineering; Physics","score_opus":0.003593044537090628,"score_gpt":0.1861308595665229,"score_spread":0.18253781502943225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403127377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21286845,0.0002799533,0.5636743,0.0000884583,0.0007701116,0.00022372202,0.000005644739,0.0020518703,0.22003752],"genre_scores_gemma":[0.98144144,0.000012115075,0.017990265,0.00000393333,0.00012813602,0.000017686261,0.000033633318,0.000035220233,0.00033756514],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991099,0.000017458431,0.00031930758,0.00016839315,0.00021891294,0.00016600081],"domain_scores_gemma":[0.9996476,0.00006391055,0.000028886701,0.00017359862,0.000048015074,0.0000379449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024662487,0.00013210198,0.00015119399,0.00021916909,0.000033515098,0.00003723418,0.00013226495,0.000048885417,0.000039909864],"category_scores_gemma":[0.000010976996,0.00013126466,0.000041303327,0.0005822537,0.00001666537,0.00014592621,0.00003861663,0.000100384495,0.00006705756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020918114,0.000011485014,0.0012187853,0.0016483138,0.0001435495,0.000023453818,0.00008336566,0.44271478,0.014844321,0.5356135,0.0009936051,0.0027027887],"study_design_scores_gemma":[0.000045265057,0.000017595035,0.0008904239,0.00014820005,0.00002059068,0.0000070568626,0.000057603615,0.99613136,0.0017880537,0.0007172123,0.000043395692,0.00013323974],"about_ca_topic_score_codex":0.00047965167,"about_ca_topic_score_gemma":0.00007697206,"teacher_disagreement_score":0.768573,"about_ca_system_score_codex":0.0007230394,"about_ca_system_score_gemma":0.000041565647,"threshold_uncertainty_score":0.5352817},"labels":[],"label_agreement":null},{"id":"W4403284936","doi":"10.1016/j.egyr.2024.09.042","title":"PPO-MixClip : An energy scheduling algorithm for low-carbon parks","year":2024,"lang":"en","type":"article","venue":"Energy Reports","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"National Natural Science Foundation of China","keywords":"Scheduling (production processes); Computer science; Carbon fibers; Energy (signal processing); Algorithm; Environmental science; Mathematical optimization; Mathematics","score_opus":0.006648515633622266,"score_gpt":0.210545506313022,"score_spread":0.20389699067939973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403284936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044829343,0.0058905133,0.89211476,0.00011159094,0.017151281,0.00017945388,0.000008829422,0.004366001,0.03534826],"genre_scores_gemma":[0.9777909,0.00027060942,0.014378553,0.00013802739,0.0028397683,0.00043155422,0.00021557395,0.00026917868,0.0036658258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997908,0.000024428631,0.0005702225,0.0006359459,0.00030160544,0.00055982627],"domain_scores_gemma":[0.9989504,0.00005752938,0.00005431434,0.0006909424,0.000047470556,0.0001993201],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003139889,0.00035662268,0.00030244736,0.00025741404,0.000072941344,0.00016241097,0.00015599374,0.00018061275,0.000050834275],"category_scores_gemma":[0.000018905173,0.00037533752,0.00016671556,0.00033591027,0.000028039056,0.0002447577,0.000072055744,0.00013020451,0.0000024929898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004365874,0.000046708396,0.000030415315,0.00011380331,0.00033219953,0.0016635729,0.00006982858,0.71166867,0.0014491602,0.008889757,0.0036971692,0.27203435],"study_design_scores_gemma":[0.000083576444,0.000040522515,0.000023025614,0.000076460645,0.00004529683,0.00010065104,0.00001842469,0.695629,0.009841764,0.0013928576,0.2923833,0.0003651012],"about_ca_topic_score_codex":0.00020490914,"about_ca_topic_score_gemma":0.000117440824,"teacher_disagreement_score":0.9329616,"about_ca_system_score_codex":0.0001549992,"about_ca_system_score_gemma":0.000045879722,"threshold_uncertainty_score":0.9998699},"labels":[],"label_agreement":null},{"id":"W4403286368","doi":"10.1016/j.apm.2024.115756","title":"Optimal scheduling of battery energy storage system operations under load uncertainty","year":2024,"lang":"en","type":"article","venue":"Applied Mathematical Modelling","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"Toronto Metropolitan University","keywords":"Energy storage; Computer science; Scheduling (production processes); Battery storage; Reliability engineering; Battery (electricity); Automotive engineering; Operations research; Mathematical optimization; Engineering; Operations management; Mathematics","score_opus":0.01673362627658421,"score_gpt":0.2084374618163108,"score_spread":0.19170383553972659,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403286368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026615746,0.00031651455,0.9539228,0.000028949331,0.00025440828,0.00012502012,0.000004015672,0.0007088076,0.018023737],"genre_scores_gemma":[0.921271,0.000023392864,0.0782748,0.000018559882,0.00014763513,0.00010079561,0.000008636767,0.00007335655,0.00008181979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986503,0.000010683965,0.0004636451,0.0002626906,0.0003232899,0.00028936172],"domain_scores_gemma":[0.9994114,0.00013964054,0.000014849514,0.0003207297,0.0000324836,0.00008091894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024703995,0.00022355122,0.00030382458,0.000118838165,0.00005546684,0.00009061335,0.00017048097,0.00009535536,0.000056512017],"category_scores_gemma":[0.0000033147678,0.00021109146,0.00008603345,0.00022292265,0.000036970232,0.000093896255,0.00006553184,0.00015666138,0.00008521076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001533581,0.000010624444,1.7487558e-8,0.0005845787,0.00007417586,0.0000035759003,0.00011773411,0.57405645,0.00070096523,0.42431113,0.00003628442,0.00010292758],"study_design_scores_gemma":[0.00009392849,0.00000571811,5.9260692e-8,0.00030035092,0.00006637739,0.0000036632753,0.00034228113,0.9927469,0.0016883783,0.0043067452,0.00023944011,0.00020615429],"about_ca_topic_score_codex":0.000011791255,"about_ca_topic_score_gemma":0.0000016675154,"teacher_disagreement_score":0.8946552,"about_ca_system_score_codex":0.0002529546,"about_ca_system_score_gemma":0.00003045321,"threshold_uncertainty_score":0.860806},"labels":[],"label_agreement":null},{"id":"W4403484665","doi":"10.2139/ssrn.4990858","title":"Projecting and Estimating Hvac Energy Savings from Correcting Control Faults: Comparison between Physical and Virtual Metering Approaches","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Metering mode; HVAC; Control (management); Computer science; Reliability engineering; Energy (signal processing); Automotive engineering; Control engineering; Engineering; Statistics; Mechanical engineering; Air conditioning; Mathematics; Artificial intelligence","score_opus":0.018360544961807748,"score_gpt":0.23340375868933994,"score_spread":0.21504321372753218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403484665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7682387,0.005407391,0.22428556,0.00005547641,0.001191599,0.00017292317,0.00001542813,0.00039673923,0.00023617667],"genre_scores_gemma":[0.9940131,0.00027937372,0.001887424,0.000009731953,0.0034984688,0.00005087663,0.000031233438,0.0001809717,0.000048853817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961634,0.0001284512,0.0007085935,0.000708798,0.00038525893,0.0019054604],"domain_scores_gemma":[0.9988746,0.00041055772,0.00027594282,0.00025512394,0.000033028955,0.00015072984],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.001161466,0.00067226076,0.0009645234,0.00030595946,0.00026107204,0.00047902614,0.00033266013,0.00025423232,0.0000014395357],"category_scores_gemma":[0.00010414231,0.0006790125,0.00016766554,0.00015229276,0.00006264937,0.0001670986,0.000846919,0.0055799074,0.0000022337083],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037537266,0.00003985329,0.0038622315,0.00040963214,0.004294455,0.000018722027,0.003951533,0.6349633,0.00088943203,0.0045143235,0.000048968996,0.34697005],"study_design_scores_gemma":[0.00061162014,0.0001610211,0.00046353522,0.0006686252,0.0006957635,0.000090438014,0.0033398746,0.9581926,0.00032047048,0.034664236,0.00006537353,0.0007264729],"about_ca_topic_score_codex":0.0005522829,"about_ca_topic_score_gemma":0.00027281206,"teacher_disagreement_score":0.3462436,"about_ca_system_score_codex":0.0011109199,"about_ca_system_score_gemma":0.00023681043,"threshold_uncertainty_score":0.9995661},"labels":[],"label_agreement":null},{"id":"W4403606092","doi":"10.3390/info15100638","title":"Voltage Deviation Improvement in Microgrid Operation through Demand Response Using Imperialist Competitive and Genetic Algorithms","year":2024,"lang":"en","type":"article","venue":"Information","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Mitacs","keywords":"Microgrid; Voltage; Demand response; Genetic algorithm; Computer science; Algorithm; Imperialist competitive algorithm; Mathematical optimization; Control theory (sociology); Engineering; Mathematics; Machine learning; Artificial intelligence; Electrical engineering; Electricity; Control (management); Meta-optimization","score_opus":0.0077323876643767275,"score_gpt":0.22319939989326348,"score_spread":0.21546701222888676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403606092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72088474,0.00044504466,0.27712074,0.00004608994,0.0007375194,0.0002895618,0.000013735623,0.00014437447,0.00031818607],"genre_scores_gemma":[0.9953189,0.0001945781,0.004192752,0.0000651346,0.00009739771,0.000038312686,0.000074190095,0.000012565154,0.0000061553824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993592,0.000020214,0.00030089475,0.00008122525,0.00011116286,0.00012732364],"domain_scores_gemma":[0.99983025,0.000025723248,0.000021541096,0.000080766775,0.000022536713,0.000019175844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020906917,0.00010664307,0.00008049174,0.00016060294,0.000042281667,0.00023606735,0.00003753631,0.00004671454,0.000017705763],"category_scores_gemma":[0.00001298283,0.00011240643,0.000014935846,0.00015167242,0.000013928369,0.0013348683,0.000029554747,0.0000622331,0.000021893971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053769552,0.000008046823,0.00020860767,0.00031498208,0.000047184276,0.00001024924,0.0042615617,0.8910888,0.06861444,0.0022618882,0.00034538846,0.03278512],"study_design_scores_gemma":[0.00032950623,0.00003771038,0.007209976,0.00007689303,0.000013280797,0.000008423866,0.00030930268,0.95690775,0.011276566,0.000057360376,0.023620373,0.00015286302],"about_ca_topic_score_codex":0.00008748888,"about_ca_topic_score_gemma":0.000025788537,"teacher_disagreement_score":0.27443418,"about_ca_system_score_codex":0.00026821424,"about_ca_system_score_gemma":0.00001960533,"threshold_uncertainty_score":0.4583801},"labels":[],"label_agreement":null},{"id":"W4403724369","doi":"10.1109/temsconlatam61834.2024.10717753","title":"Evaluating the Impact of V2G on Frequency Regulation in the Colombian Electricity Grid","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Electricity; Grid; Vehicle-to-grid; Electrical engineering; Computer science; Environmental economics; Telecommunications; Engineering; Economics; Physics; Geography; Power (physics)","score_opus":0.033709462559921716,"score_gpt":0.324116986475302,"score_spread":0.2904075239153803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403724369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9541972,0.00015369557,0.0014114337,0.00022883175,0.00028631103,0.00023450745,0.0000014441982,0.00013977935,0.04334675],"genre_scores_gemma":[0.99962145,0.000012098002,0.00010361177,0.000027144846,0.000112967246,0.000026198675,0.0000041989583,0.000012511057,0.00007979771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993478,0.000068345515,0.00015748721,0.00009096538,0.00019906949,0.00013630165],"domain_scores_gemma":[0.999554,0.00019251229,0.000011813431,0.00022101028,0.000011598404,0.000009095337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007098794,0.00008066529,0.000067457964,0.00009156936,0.000025032672,0.000036048736,0.00014848281,0.000025494846,0.00011220165],"category_scores_gemma":[0.000044877255,0.00004164348,0.000055689146,0.00053116475,0.000010293073,0.00007575323,0.000010949735,0.00012742875,0.00001730063],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032317157,0.000011793707,0.000504954,0.000019193942,0.000040840387,0.0000015354088,0.00030080456,0.97351927,0.004169752,0.011491098,0.005129554,0.004807958],"study_design_scores_gemma":[0.00007299435,0.00016923703,0.1276215,0.000027012164,0.000011394051,0.0000012340108,0.000034413573,0.86817265,0.0013223973,0.0024062556,0.00009770344,0.00006318893],"about_ca_topic_score_codex":0.00050150184,"about_ca_topic_score_gemma":0.000113659364,"teacher_disagreement_score":0.12711655,"about_ca_system_score_codex":0.00016556277,"about_ca_system_score_gemma":0.000015259418,"threshold_uncertainty_score":0.1698172},"labels":[],"label_agreement":null},{"id":"W4403846111","doi":"10.18280/jesa.570506","title":"Enhancing Grid Stability and Efficiency: Cost-Effective Hardware Implementation for Advanced Control of Grid-Connected PV Systems","year":2024,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Grid; Computer science; Control (management); Stability (learning theory); Photovoltaic system; Embedded system; Computer hardware; Engineering; Electrical engineering; Artificial intelligence; Mathematics","score_opus":0.011200632003909623,"score_gpt":0.2569539760061959,"score_spread":0.2457533440022863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403846111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5245665,0.0058022127,0.46202755,0.000031898686,0.004032148,0.0025480248,0.00024457678,0.0005832082,0.00016388959],"genre_scores_gemma":[0.99772173,0.00015315706,0.0011352532,0.000009219076,0.00041745184,0.00044983267,0.0000200122,0.00007580251,0.000017529665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979856,0.0001992549,0.0008110219,0.00028040234,0.00031492344,0.00040880905],"domain_scores_gemma":[0.99869287,0.00059019314,0.00017293205,0.00019554175,0.00022053925,0.00012790803],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009865571,0.000279653,0.00048206735,0.00026340107,0.00016779124,0.0002621692,0.000154339,0.000058759455,0.00003510787],"category_scores_gemma":[0.00017442813,0.00025142636,0.00013148654,0.00032060847,0.000058804948,0.00044715978,0.00003851614,0.00019321352,0.0000053940666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012677387,0.00007751854,0.0017096507,0.0120916795,0.0015407206,0.00009362637,0.0032306286,0.6060884,0.09965974,0.002686383,0.001976817,0.2707181],"study_design_scores_gemma":[0.002617194,0.000544872,0.06524452,0.0015528174,0.00034245508,0.00022946058,0.001774338,0.8961098,0.025513569,0.00023256397,0.005318043,0.00052035914],"about_ca_topic_score_codex":0.000023607867,"about_ca_topic_score_gemma":0.00003866682,"teacher_disagreement_score":0.47315526,"about_ca_system_score_codex":0.00050554634,"about_ca_system_score_gemma":0.000050906325,"threshold_uncertainty_score":0.9999938},"labels":[],"label_agreement":null},{"id":"W4404035338","doi":"10.2139/ssrn.5009204","title":"Energy Scheduling and Economic Assessment of a Rural Microgrid Using Two-Stage Stochastic Framework","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Scheduling (production processes); Stage (stratigraphy); Environmental economics; Computer science; Energy (signal processing); Operations research; Economics; Business; Natural resource economics; Operations management; Engineering; Mathematics; Statistics; Control (management); Artificial intelligence","score_opus":0.008031881957715505,"score_gpt":0.2601657338807396,"score_spread":0.2521338519230241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404035338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52962977,0.019915478,0.4475501,0.000049451683,0.0024423883,0.00010272305,0.000014582538,0.000113291855,0.00018222119],"genre_scores_gemma":[0.985249,0.0071071847,0.006176987,0.000013086928,0.0012004719,0.000016390437,0.000011676104,0.00014980047,0.00007540408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970225,0.000054731983,0.0006625558,0.0003041355,0.00023001332,0.0017260535],"domain_scores_gemma":[0.99920875,0.00006362313,0.00021823884,0.00036220552,0.000032933855,0.00011426607],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00088438636,0.0004769028,0.0005705587,0.00046457094,0.000083099796,0.00020462844,0.00038123154,0.00024699033,0.000028340206],"category_scores_gemma":[0.000008362463,0.00051534246,0.00023311788,0.000102093225,0.000057367368,0.000078166486,0.0006966555,0.0044409637,0.0000034497177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000622375,0.000010372381,0.000069490314,0.0001720502,0.0011302258,0.0000060292114,0.000053898668,0.88848764,0.00052516226,0.10654801,0.0000072324046,0.002983637],"study_design_scores_gemma":[0.00031116346,0.00005663688,0.000030404613,0.00078243786,0.00031863753,0.00016896693,0.0006466815,0.8517122,0.00012233543,0.14522739,0.00013598519,0.0004871365],"about_ca_topic_score_codex":0.0003456365,"about_ca_topic_score_gemma":0.00037934908,"teacher_disagreement_score":0.45561922,"about_ca_system_score_codex":0.003629385,"about_ca_system_score_gemma":0.0015126173,"threshold_uncertainty_score":0.9997298},"labels":[],"label_agreement":null},{"id":"W4404102331","doi":"10.1109/sege62220.2024.10739525","title":"Improving Decision-Making in Distribution Networks Using Data Analysis","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Barrie Urology Group","funders":"","keywords":"Computer science; Data science","score_opus":0.01609588387621954,"score_gpt":0.2635986485801395,"score_spread":0.24750276470391994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404102331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03444906,0.0006928705,0.9631813,0.0000061019778,0.00066077546,0.00004446084,0.00001235072,0.0003619259,0.00059112033],"genre_scores_gemma":[0.9897216,0.000033984106,0.009879627,0.000008659483,0.00014826925,0.0000026274718,0.00017582938,0.000019374527,0.000010010469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916315,0.000009567845,0.00021469084,0.0002754227,0.00012138495,0.00021576535],"domain_scores_gemma":[0.9993347,0.000104318984,0.000008312322,0.0005216093,0.000006604747,0.000024485904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030140288,0.0001028432,0.00012446808,0.00025129266,0.000025524809,0.0001528937,0.00023894491,0.000045347846,0.00006833315],"category_scores_gemma":[0.000029886887,0.00010049201,0.0000422437,0.0016116778,0.0000063009406,0.00032106924,0.0002605793,0.000113081784,0.000007837095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.602012e-7,0.0000024438295,0.0010115822,0.0000138224195,0.00016734097,0.00002399981,0.000006361366,0.9496319,0.000018054416,0.0004896674,0.0005472606,0.04808668],"study_design_scores_gemma":[0.000028496283,0.0000011842873,0.0025727085,0.00006230915,0.00019677852,9.0967757e-7,0.000018378832,0.9955922,0.0000063906036,0.00004600921,0.0013577458,0.00011688332],"about_ca_topic_score_codex":0.00013589389,"about_ca_topic_score_gemma":0.0005473345,"teacher_disagreement_score":0.95527256,"about_ca_system_score_codex":0.00021045275,"about_ca_system_score_gemma":0.0000063203156,"threshold_uncertainty_score":0.40979454},"labels":[],"label_agreement":null},{"id":"W4404102626","doi":"10.1109/sege62220.2024.10739597","title":"Optimal Smart Inverter Volt-Watt and Volt-Var Settings to Maximize Fair Contribution in Voltage Regulation","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Volt; Watt; Inverter; Voltage; Electrical engineering; Computer science; Engineering; Power (physics); Physics","score_opus":0.004466811477948585,"score_gpt":0.1894228483706331,"score_spread":0.18495603689268453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404102626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6094677,0.00029352104,0.37729952,0.002372581,0.0013674138,0.0005672039,0.000012622085,0.0014582784,0.007161166],"genre_scores_gemma":[0.9951346,0.000016290012,0.0021657143,0.00036448683,0.00014445774,0.00006100255,0.000043504206,0.000044102104,0.0020258217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989349,0.000015335747,0.00026422745,0.00030728505,0.0001679476,0.00031028767],"domain_scores_gemma":[0.9996399,0.000044116467,0.000009904005,0.00018776568,0.000027209964,0.00009108307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028098628,0.00018846459,0.00017176589,0.00027501554,0.000029579085,0.00012766059,0.00008359866,0.00008922056,0.00018791268],"category_scores_gemma":[0.00003148929,0.00018902915,0.000036474907,0.00034744295,0.000016768354,0.00030346797,0.00009899131,0.00013055862,0.00016840769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049886246,0.00003173793,0.0040947655,0.00038307515,0.00016389911,0.00008454634,0.0007586889,0.69006187,0.031997636,0.014017401,0.24647093,0.011885552],"study_design_scores_gemma":[0.0003595589,0.000030857507,0.015443691,0.00009479437,0.000018470097,0.000005051538,0.000051511077,0.8766179,0.0047105313,0.00023021355,0.10217937,0.00025802685],"about_ca_topic_score_codex":0.00008037187,"about_ca_topic_score_gemma":0.00014773359,"teacher_disagreement_score":0.38566694,"about_ca_system_score_codex":0.00020182728,"about_ca_system_score_gemma":0.0000069399066,"threshold_uncertainty_score":0.7708385},"labels":[],"label_agreement":null},{"id":"W4404103003","doi":"10.1109/sege62220.2024.10739592","title":"Preface","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ontario Institute of Technology","funders":"","keywords":"Computer science","score_opus":0.0033390749935251172,"score_gpt":0.1673486147064073,"score_spread":0.16400953971288218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103003","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011348498,0.0007503344,0.06794783,0.00014461897,0.001601519,0.000028870496,3.231858e-7,0.0028862571,0.9152917],"genre_scores_gemma":[0.98508304,0.000032602493,0.0007678435,0.00002828297,0.000105747,0.0000069840103,8.382915e-7,0.0000144584465,0.01396018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998352,8.2824437e-7,0.000028734285,0.00004261289,0.000033487962,0.00005913373],"domain_scores_gemma":[0.9999161,0.0000052775354,2.8229596e-7,0.00006467249,0.0000010959584,0.000012621939],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000017735094,0.000030401272,0.00001864109,0.000025189522,0.0000036754655,0.000024570125,0.000031007705,0.000008478389,0.00043881685],"category_scores_gemma":[6.1381104e-7,0.000026117894,0.000010934524,0.0000638461,0.0000020476937,0.00003965928,0.000010299015,0.000022769294,0.0008901044],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.3774861e-7,0.0000016315105,0.000023397477,0.00008285545,0.00004896044,0.000015354874,0.000043854594,0.51046574,0.0007495666,0.06561166,0.40955675,0.013400058],"study_design_scores_gemma":[0.000008681881,0.0000014024911,0.00016667615,0.00000482115,0.000002128789,5.7777015e-7,0.0000042624106,0.28584397,0.0018312734,0.00012759068,0.71197236,0.000036249257],"about_ca_topic_score_codex":0.0000021519597,"about_ca_topic_score_gemma":0.00000258422,"teacher_disagreement_score":0.97373456,"about_ca_system_score_codex":0.000015616683,"about_ca_system_score_gemma":8.9618794e-7,"threshold_uncertainty_score":0.9998878},"labels":[],"label_agreement":null},{"id":"W4404103012","doi":"10.1109/sege62220.2024.10739547","title":"Improvement of Microgrids Operation Considering Demand Response Using Imperialist Competitive Algorithm","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Demand response; Imperialist competitive algorithm; Algorithm; Algorithm design; Mathematical optimization; Engineering; Mathematics; Electrical engineering; Electricity; Metaheuristic","score_opus":0.009762401596526915,"score_gpt":0.22985677221748166,"score_spread":0.22009437062095474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64560044,0.0007229548,0.3486019,0.00007356891,0.0021145137,0.0002580812,0.000025018056,0.00047246882,0.0021310612],"genre_scores_gemma":[0.9747374,0.00005834668,0.024769876,0.00003762457,0.00018246821,0.000017083175,0.000011079493,0.00004224893,0.00014383854],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992401,0.000025384603,0.00027255554,0.0001688345,0.00012213111,0.0001709648],"domain_scores_gemma":[0.9997045,0.00006400985,0.000012183271,0.00015197847,0.000029046694,0.000038327584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003089289,0.0001387615,0.00014932489,0.00014100477,0.000036050187,0.000096896976,0.000062908,0.000039528808,0.00016663736],"category_scores_gemma":[0.000009488142,0.00013659142,0.0000486674,0.00013392288,0.000036433514,0.00014459943,0.00006191661,0.0000622661,0.000012477891],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019228399,0.000011171266,0.000012100003,0.0001239261,0.00016013248,0.000026458654,0.00025395254,0.22140773,0.77055955,0.0021236734,0.00052873284,0.0047733695],"study_design_scores_gemma":[0.00018194951,0.0000444156,0.000088944944,0.00007037416,0.00002904737,0.000007909291,0.00025003593,0.6091315,0.3804802,0.000021145433,0.009547906,0.00014653412],"about_ca_topic_score_codex":0.00007306914,"about_ca_topic_score_gemma":0.00001543874,"teacher_disagreement_score":0.39007932,"about_ca_system_score_codex":0.00015927923,"about_ca_system_score_gemma":0.000026860838,"threshold_uncertainty_score":0.5570037},"labels":[],"label_agreement":null},{"id":"W4404103279","doi":"10.1109/sege62220.2024.10739555","title":"Quadratic-Equation Based Volt-Watt Control Rules Design Strategy to Mitigate Overvoltage in Power Grids with High Penetration of Solar Sources","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Overvoltage; Penetration (warfare); Watt; Volt; Electrical engineering; Quadratic equation; Control theory (sociology); Power (physics); Power control; Engineering; Computer science; Control (management); Voltage; Physics; Mathematics; Operations research","score_opus":0.01062574601700831,"score_gpt":0.1922310961048787,"score_spread":0.1816053500878704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404103279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35459056,0.00007754693,0.6436371,0.00009422513,0.00014467779,0.000328584,0.000007892575,0.00021578331,0.0009036089],"genre_scores_gemma":[0.9941236,0.0000039712327,0.0054702796,0.00007154547,0.000047897483,0.000084861116,0.000025618883,0.000044293865,0.00012797232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887526,0.000058621335,0.00032828984,0.0002290486,0.00027750834,0.00023127704],"domain_scores_gemma":[0.99953663,0.00013452308,0.000023120398,0.00020466592,0.000039329047,0.00006171592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033710178,0.0001972131,0.00020325994,0.00029608345,0.000021235319,0.00011370907,0.00010897698,0.00006372063,0.00024778274],"category_scores_gemma":[0.000016313421,0.00016745798,0.000034849923,0.000316962,0.000018903162,0.0002678927,0.000009566661,0.000092870214,0.00004884737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034921817,0.000021971351,0.0005321997,0.00010729292,0.00006658733,0.000015261416,0.0001528703,0.97906375,0.014387926,0.004695635,0.00048687946,0.00043471545],"study_design_scores_gemma":[0.0006246938,0.0003374174,0.013167393,0.00012952095,0.00003778134,5.125152e-7,0.00012473788,0.953314,0.031466346,0.000244216,0.0003011032,0.00025224945],"about_ca_topic_score_codex":0.00030376212,"about_ca_topic_score_gemma":0.00046412402,"teacher_disagreement_score":0.639533,"about_ca_system_score_codex":0.00009546123,"about_ca_system_score_gemma":0.00004391229,"threshold_uncertainty_score":0.68287385},"labels":[],"label_agreement":null},{"id":"W4404178434","doi":"10.1109/access.2024.3493012","title":"Balancing Power Grids and Maximizing Revenue: A Novel Approach to Rebate Auctions for Cloud Workload Migrations","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Timeline; Maximization; Computer science; Common value auction; Grid; Revenue; Mathematical optimization; Power grid; Power (physics); Operations research; Microeconomics; Business; Economics; Finance; Mathematics","score_opus":0.024312762740357843,"score_gpt":0.26209103365603764,"score_spread":0.2377782709156798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404178434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08001306,0.0009344249,0.90870744,0.00050345314,0.0051603224,0.0004635938,0.0000661538,0.0005601191,0.0035914339],"genre_scores_gemma":[0.98394793,0.00006895004,0.01337653,0.0001496918,0.00093219074,0.00046612867,0.000013395131,0.000073395706,0.00097175676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992033,0.00000614887,0.00017673832,0.00026520246,0.00010012681,0.00024846697],"domain_scores_gemma":[0.99961466,0.000050672614,0.000011396744,0.00022245318,0.000024428937,0.00007637892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014937432,0.0001423831,0.00012653311,0.00018303427,0.00010731143,0.00032046955,0.0001827141,0.000049806567,0.0000047845433],"category_scores_gemma":[0.000020842239,0.00015030715,0.00004859343,0.00045145722,0.000012498439,0.00031447268,0.000057819303,0.00011199848,0.0000109427065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008030036,0.00003399167,0.00012741821,0.00038623964,0.00018866277,0.0000041004364,0.0008804462,0.82076204,0.004193125,0.002545462,0.16683425,0.004036263],"study_design_scores_gemma":[0.000598325,0.00004433367,0.004565595,0.00067544734,0.00018829081,0.000036762474,0.00026094282,0.48175755,0.0032275144,0.0008916866,0.506868,0.0008855559],"about_ca_topic_score_codex":0.00003576742,"about_ca_topic_score_gemma":0.000048759422,"teacher_disagreement_score":0.9039349,"about_ca_system_score_codex":0.00008162244,"about_ca_system_score_gemma":0.00001018607,"threshold_uncertainty_score":0.61293477},"labels":[],"label_agreement":null},{"id":"W4404205163","doi":"10.1016/j.segan.2024.101560","title":"Cooperative price-based demand response program for multiple aggregators based on multi-agent reinforcement learning and Shapley-value","year":2024,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Collège Shawinigan; Université du Québec à Trois-Rivières","funders":"","keywords":"Shapley value; Reinforcement learning; Reinforcement; On demand; Demand response; Microeconomics; Value (mathematics); Computer science; Economics; Game theory; Artificial intelligence; Engineering; Machine learning","score_opus":0.005931316356659513,"score_gpt":0.22498558376003783,"score_spread":0.2190542674033783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404205163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03256645,0.0053153625,0.95859736,0.00020706894,0.0005829979,0.001181592,0.0000038511607,0.0010309353,0.0005143774],"genre_scores_gemma":[0.99247104,0.00044868398,0.0019528203,0.0001785082,0.0002498355,0.0012070978,0.000087141336,0.00011346942,0.003291408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808943,0.000111946014,0.0003131203,0.0005125643,0.00019402399,0.00077888794],"domain_scores_gemma":[0.99890023,0.0005522174,0.00003923367,0.00020469248,0.00009239974,0.00021121124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000736879,0.0004046514,0.00029062972,0.0002899306,0.0003683998,0.00032189608,0.00009906944,0.00016166859,0.000015956795],"category_scores_gemma":[0.00012077341,0.00037052113,0.00008714943,0.0004156304,0.00008015836,0.0001421822,0.00008015453,0.0002529361,6.7250016e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050436985,0.000046149366,0.00016363323,0.0003913654,0.00011902171,0.000095111056,0.00008920027,0.98487264,0.000024265959,0.004197771,0.0015411231,0.007955344],"study_design_scores_gemma":[0.0012543014,0.00063651864,0.000142525,0.00017671955,0.000043472824,0.0000011281151,0.0002475131,0.7611184,0.00036578072,0.000012408998,0.23566197,0.00033922578],"about_ca_topic_score_codex":0.00005598113,"about_ca_topic_score_gemma":0.000016596612,"teacher_disagreement_score":0.9599046,"about_ca_system_score_codex":0.0003001762,"about_ca_system_score_gemma":0.00007738003,"threshold_uncertainty_score":0.99987465},"labels":[],"label_agreement":null},{"id":"W4404281911","doi":"10.1016/j.solener.2024.113074","title":"Streamlining structural engineering compliance of rooftop solar photovoltaic installations using an open-source approach","year":2024,"lang":"en","type":"article","venue":"Solar Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Photovoltaic system; Environmental science; Engineering physics; Engineering; Electrical engineering","score_opus":0.03702924565284634,"score_gpt":0.2539248908955193,"score_spread":0.21689564524267294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404281911","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28944165,0.0012462289,0.7033395,0.000004293215,0.0010014765,0.00014161605,0.000023064387,0.0008954779,0.0039066784],"genre_scores_gemma":[0.97080404,0.000025572115,0.02856363,0.000014343909,0.00022776538,0.000020671074,0.00009036985,0.00013295781,0.00012064069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986643,0.000027666962,0.00036030746,0.00036069023,0.00021766195,0.00036937685],"domain_scores_gemma":[0.9993293,0.000036733,0.00003685376,0.00045228086,0.00003677496,0.00010804869],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014571132,0.00027940914,0.00028990422,0.00023937834,0.00009616493,0.00021857145,0.0004792311,0.00009691945,0.00004808765],"category_scores_gemma":[0.000012234246,0.00030836943,0.00006877572,0.000518546,0.00002962195,0.0006552865,0.0002400329,0.00019884139,0.000002565643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002607268,0.000013742243,0.0000961689,0.0001673344,0.00013746775,0.0000071674567,0.00019477993,0.9631143,0.028990716,0.0034231397,0.000047142294,0.0038054257],"study_design_scores_gemma":[0.00016017866,0.000026434744,0.00024030611,0.00013433295,0.000038654685,0.0000150753,0.00009097645,0.97593075,0.010214382,0.00011234087,0.01271489,0.00032167847],"about_ca_topic_score_codex":0.00046332402,"about_ca_topic_score_gemma":0.00005735155,"teacher_disagreement_score":0.6813624,"about_ca_system_score_codex":0.000143307,"about_ca_system_score_gemma":0.000032126023,"threshold_uncertainty_score":0.9999368},"labels":[],"label_agreement":null},{"id":"W4404510387","doi":"10.2316/j.2024.203-0541","title":"DESIGN OF GRID SYNCHRONISATION METHOD UNDER HARMONIC POLLUTION CONDITIONS, 1-10.","year":2024,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Grid; Pollution; Harmonic; Computer science; Environmental science; Mathematics; Acoustics; Physics; Geometry","score_opus":0.01351838080489186,"score_gpt":0.2578980017669428,"score_spread":0.2443796209620509,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404510387","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029023497,0.005948774,0.9804067,0.00020805783,0.008851088,0.00002600178,0.000014944599,0.000050333678,0.0015917239],"genre_scores_gemma":[0.99769664,0.0005018698,0.00079171645,0.000026927231,0.0005441303,0.0000052997743,0.000011067207,0.000019220453,0.0004031189],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989871,0.00006897651,0.00043160396,0.00008298492,0.00033842542,0.00009092862],"domain_scores_gemma":[0.9995606,0.000084746214,0.000090511596,0.00006420548,0.00015548286,0.000044445667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003913198,0.00010171388,0.00015296014,0.00035190917,0.000017269645,0.000089134155,0.00013567392,0.00005062313,0.00009276747],"category_scores_gemma":[0.000010092943,0.00009103988,0.00006603714,0.000090205496,0.000020716636,0.00026736953,0.000019136087,0.0000730476,0.000004234113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000149516,0.000012465118,0.0000082157885,0.000037299327,0.00064708054,0.000028380806,0.00010837084,0.9590876,0.0048878016,0.022067687,0.01214994,0.0009502133],"study_design_scores_gemma":[0.0007159806,0.00018364789,0.0011580262,0.00077253365,0.00014412867,0.0007512519,0.00041305716,0.8412212,0.0059993425,0.0012172044,0.14713606,0.0002875277],"about_ca_topic_score_codex":0.000049367358,"about_ca_topic_score_gemma":0.0000013316888,"teacher_disagreement_score":0.9947943,"about_ca_system_score_codex":0.00019748557,"about_ca_system_score_gemma":0.000036111105,"threshold_uncertainty_score":0.37124988},"labels":[],"label_agreement":null},{"id":"W4404510399","doi":"10.2316/j.2024.203-0537","title":"STATE ESTIMATION AND ENERGY MANAGEMENT OF MICROGRID ENERGY STORAGE SYSTEM USING PARTICLE FILTER AND MARKOV CHAIN MONTE CARLO, 1-14.","year":2024,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle filter; Microgrid; Markov chain Monte Carlo; Monte Carlo method; Markov chain; Energy management system; Particle (ecology); Energy storage; Energy (signal processing); Markov process; Estimation; State (computer science); Computer science; Filter (signal processing); Energy management; Statistical physics; Engineering; Mathematics; Physics; Statistics; Algorithm; Thermodynamics; Control (management); Power (physics); Artificial intelligence","score_opus":0.006842338584987204,"score_gpt":0.20683394402180055,"score_spread":0.19999160543681335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404510399","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71624833,0.040578384,0.2328071,0.000121602214,0.008531223,0.000049661874,0.000050215436,0.00012198597,0.0014915041],"genre_scores_gemma":[0.9970089,0.0017366124,0.0004936971,0.000017178869,0.00017299893,0.000007422146,0.0000033664805,0.00003557662,0.00052425265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861884,0.000055016564,0.0005927207,0.00017541321,0.00038117552,0.00017685127],"domain_scores_gemma":[0.9994924,0.000042603995,0.00013505762,0.00010661767,0.00011757183,0.000105731924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028919952,0.0001924134,0.0002690998,0.00028599205,0.000031245523,0.00019884718,0.00013523197,0.000049611615,0.000005390391],"category_scores_gemma":[0.000002734242,0.00017481233,0.000060228875,0.00010175391,0.000040643146,0.0003105293,0.00009481662,0.00006300699,2.2607533e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007938575,0.000031642998,0.00027429644,0.000703291,0.0021956917,0.000757183,0.0005799787,0.93615204,0.002457896,0.024919465,0.0012694256,0.030579686],"study_design_scores_gemma":[0.0004788262,0.00005775617,0.00040281058,0.0011403734,0.00008889689,0.00051940815,0.00038875313,0.97264975,0.00088230934,0.000036037058,0.023164272,0.00019078278],"about_ca_topic_score_codex":0.0005241276,"about_ca_topic_score_gemma":0.000021608195,"teacher_disagreement_score":0.28076056,"about_ca_system_score_codex":0.00016029202,"about_ca_system_score_gemma":0.000010756289,"threshold_uncertainty_score":0.71286404},"labels":[],"label_agreement":null},{"id":"W4404514986","doi":"10.1016/j.egyai.2024.100446","title":"Decentralized coordination of distributed energy resources through local energy markets and deep reinforcement learning","year":2024,"lang":"en","type":"article","venue":"Energy and AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates; Natural Sciences and Engineering Research Council of Canada; Mitacs; University of Alberta; Alberta Machine Intelligence Institute","keywords":"Reinforcement learning; Energy (signal processing); Reinforcement; Distributed computing; Computer science; Distributed generation; Environmental economics; Artificial intelligence; Engineering; Economics; Renewable energy; Ecology; Biology; Physics","score_opus":0.0036564939444611354,"score_gpt":0.18870993167785502,"score_spread":0.1850534377333939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404514986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012263246,0.011704966,0.9696324,0.00024157297,0.0004434797,0.0000251304,0.0000033880299,0.00033397667,0.0053518605],"genre_scores_gemma":[0.99371797,0.0048012882,0.00011655749,0.00010382909,0.0000911549,0.000022792046,0.000122926,0.00003381047,0.0009896711],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989966,0.000051827577,0.0002726634,0.00023978138,0.00017822765,0.00026087978],"domain_scores_gemma":[0.99966663,0.00007949595,0.00003052401,0.00012579998,0.000025251713,0.00007226918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098002194,0.00020191119,0.00020630917,0.0001069256,0.00008064939,0.000067669556,0.000077059434,0.00009468094,0.00007791419],"category_scores_gemma":[0.000012114683,0.00019626203,0.000045486013,0.00024212283,0.000083644125,0.00019673265,0.00008828479,0.00007679655,4.7917445e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039895956,0.0000118308,0.000073397605,0.00012141265,0.0002291572,0.000024680776,0.0002205533,0.7687452,0.0004613898,0.17222384,0.0037527103,0.05409593],"study_design_scores_gemma":[0.00026064503,0.00003352874,0.00016392682,0.000070313814,0.000031457443,0.000005225618,0.00007139147,0.47932854,0.0045702555,0.00066765124,0.5146422,0.00015491217],"about_ca_topic_score_codex":0.00037519392,"about_ca_topic_score_gemma":0.00012464977,"teacher_disagreement_score":0.98145473,"about_ca_system_score_codex":0.00005570752,"about_ca_system_score_gemma":0.0000071364616,"threshold_uncertainty_score":0.8003333},"labels":[],"label_agreement":null},{"id":"W4404515272","doi":"10.1016/j.tej.2024.107447","title":"Is it worthwhile to participate in transactive energy? A decision-making model for empowering residential customers","year":2024,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Hydro-Québec","keywords":"Transactive memory; Business; Group decision-making; Decision-making models; Environmental economics; Knowledge management; Marketing; Computer science; Psychology; Economics; Social psychology","score_opus":0.021610082086503876,"score_gpt":0.296763006032032,"score_spread":0.2751529239455281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404515272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15427828,0.00054894784,0.84301496,0.0006510603,0.000654112,0.00014528264,0.000004389419,0.00009930089,0.0006036646],"genre_scores_gemma":[0.9976322,0.00020193377,0.0012334995,0.00033317402,0.00027962646,0.000070180075,3.895707e-7,0.000057876812,0.00019111007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848425,0.000031655152,0.00037908743,0.0002088236,0.0003226702,0.00057350984],"domain_scores_gemma":[0.999411,0.00025475206,0.000025810155,0.00017414386,0.00003652108,0.00009781483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006575909,0.00018816424,0.00019336354,0.00050474214,0.00015356335,0.00022237447,0.00031676775,0.000054389904,0.00005235808],"category_scores_gemma":[0.00004279728,0.00015525798,0.00015016354,0.00083290174,0.000011319884,0.00022991833,0.000028945802,0.00038451777,0.000013978045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009567063,0.000011021223,0.000008269853,0.000014674917,0.00011862566,0.000033855536,0.0029604924,0.9611528,0.000612893,0.00023077695,0.009739266,0.025021663],"study_design_scores_gemma":[0.00020217871,0.00003822049,0.00008828167,0.00020181622,0.00005370667,0.000026822609,0.00009250327,0.990545,0.0020337768,0.0028816268,0.0036414785,0.00019460541],"about_ca_topic_score_codex":0.000020129019,"about_ca_topic_score_gemma":0.00028849917,"teacher_disagreement_score":0.8433539,"about_ca_system_score_codex":0.0003796213,"about_ca_system_score_gemma":0.00005471393,"threshold_uncertainty_score":0.6331237},"labels":[],"label_agreement":null},{"id":"W4404670555","doi":"10.1016/j.compeleceng.2024.109895","title":"Eco-power management system with operation and voltage security objectives of distribution system operator considering networked virtual power plants with electric vehicles parking lot and price-based demand response","year":2024,"lang":"en","type":"article","venue":"Computers & Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Demand response; Operator (biology); Electric power system; Power (physics); Management system; Business; Distribution management system; Distribution (mathematics); Computer science; Environmental economics; Computer security; Engineering; Electrical engineering; Operations management; Economics; Electricity","score_opus":0.002468435195651508,"score_gpt":0.16027931838242737,"score_spread":0.15781088318677586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404670555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49247244,0.001179895,0.5053636,0.000006241685,0.00014689738,0.00029107518,0.0000048556985,0.0005072209,0.000027790646],"genre_scores_gemma":[0.9984934,0.00004209835,0.0012670818,0.0000063768207,0.000047796588,0.000059035756,0.000013415275,0.000068468864,0.0000023508053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984168,0.00006263445,0.00033924732,0.00044613206,0.00028680422,0.00044841794],"domain_scores_gemma":[0.99932307,0.00027978484,0.000038472754,0.0001930876,0.000030938143,0.00013463687],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039262287,0.00036345792,0.0003945188,0.00031989525,0.000094107156,0.00022600117,0.000113265196,0.0000857602,6.784024e-7],"category_scores_gemma":[0.0000072752377,0.0003208473,0.000032828368,0.00050432567,0.000028099059,0.00020726625,0.000060644437,0.00024351306,9.2046184e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031540863,0.000018568178,0.0002041275,0.00097189914,0.00038686473,0.000235238,0.0001799318,0.9894602,0.0039085834,0.003718451,0.00007541047,0.0005253616],"study_design_scores_gemma":[0.0007404092,0.0004362094,0.0033884381,0.0011683386,0.00007002833,0.00009836896,0.00010934462,0.98916024,0.0040665506,6.522399e-7,0.00037986052,0.0003815886],"about_ca_topic_score_codex":0.0000059380814,"about_ca_topic_score_gemma":0.0000013256499,"teacher_disagreement_score":0.5060209,"about_ca_system_score_codex":0.000590714,"about_ca_system_score_gemma":0.00002949523,"threshold_uncertainty_score":0.99992436},"labels":[],"label_agreement":null},{"id":"W4404708473","doi":"10.1109/tpwrd.2024.3505843","title":"A Mixed-Integer Nonlinear Model to Support the Operation of Distribution Systems With Hidden DERs","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Mitacs; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Nonlinear system; Integer (computer science); Applied mathematics; Mathematical optimization; Computer science; Distribution (mathematics); Mathematics; Control theory (sociology); Physics; Mathematical analysis; Artificial intelligence","score_opus":0.01395465714219386,"score_gpt":0.20473949819966758,"score_spread":0.19078484105747373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404708473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05603384,0.0000626082,0.9410706,0.00013322973,0.001441339,0.00027213164,0.00016691361,0.00027592233,0.000543426],"genre_scores_gemma":[0.9989183,0.000040015788,0.00038291133,0.000042838477,0.0000313353,0.00010357219,0.000024516781,0.000039107737,0.0004174155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991675,0.000018337563,0.00021165807,0.00018651641,0.00024363417,0.00017237928],"domain_scores_gemma":[0.99957824,0.000034189998,0.000010875722,0.0002679826,0.000054537675,0.00005419296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011476914,0.00015577557,0.00012445048,0.00012033278,0.00006333294,0.000071649796,0.00012239223,0.00005309207,0.000036867477],"category_scores_gemma":[7.345817e-7,0.00011477464,0.0000697598,0.0002675824,0.000025515359,0.00018342311,0.0000013581491,0.00015611525,0.0000963164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025341978,0.000028201996,8.2197397e-7,0.00005461373,0.00014804486,0.000006593056,0.00025025706,0.9925718,0.0005415808,0.00017695781,0.0053842524,0.00081158074],"study_design_scores_gemma":[0.0001171383,0.00013145102,0.000009587111,0.00009030792,0.000083356084,0.000008960287,0.0002250191,0.98821044,0.006993312,0.000002331131,0.00398373,0.00014438719],"about_ca_topic_score_codex":0.00005916875,"about_ca_topic_score_gemma":0.00007375092,"teacher_disagreement_score":0.94288445,"about_ca_system_score_codex":0.0001641868,"about_ca_system_score_gemma":0.000037003076,"threshold_uncertainty_score":0.4680374},"labels":[],"label_agreement":null},{"id":"W4404788856","doi":"10.1109/tpwrd.2024.3507093","title":"Power Oscillation Localization: A Synchrophasor Based Adaptive Vold-Kalman Filtering Energy Flow","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Delivery","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Development Research Centre","funders":"National Natural Science Foundation of China","keywords":"Kalman filter; Oscillation (cell signaling); Power flow; Electric power system; Adaptive filter; Control theory (sociology); Flow (mathematics); Computer science; Power (physics); Engineering; Physics; Electronic engineering; Artificial intelligence; Mechanics","score_opus":0.008251429781092386,"score_gpt":0.18920954011917904,"score_spread":0.18095811033808665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404788856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004157035,0.00039266402,0.98439294,0.000069755035,0.0049521322,0.00013444314,0.00005854385,0.0013590226,0.004483466],"genre_scores_gemma":[0.99695987,0.000102999526,0.0018659434,0.00024005241,0.0000732703,0.000088323606,0.000015857777,0.00011600966,0.00053765805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985457,0.000039120903,0.0003108583,0.000415964,0.0003494727,0.0003388677],"domain_scores_gemma":[0.9993407,0.00008598181,0.00001853804,0.00037628462,0.00006469117,0.00011381951],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000087291264,0.00032905376,0.00019677209,0.0005042376,0.00014643147,0.00012196327,0.00014573145,0.00013263406,0.0014960965],"category_scores_gemma":[0.0000014837583,0.0003610861,0.00018607457,0.0006153673,0.00004265632,0.0003808274,0.0000023134744,0.00019989024,0.00022496918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003242883,0.000044537293,0.000001151851,0.000043833872,0.00018580872,0.00006158479,0.0001471005,0.99087065,0.0007631788,0.00014811502,0.004358671,0.003342951],"study_design_scores_gemma":[0.0002679944,0.00012813364,0.00002489944,0.00017099292,0.000060036717,0.000007441585,0.000044468034,0.95091426,0.009005718,0.00002164889,0.03897846,0.00037597047],"about_ca_topic_score_codex":0.000036042187,"about_ca_topic_score_gemma":0.00003657586,"teacher_disagreement_score":0.99280286,"about_ca_system_score_codex":0.00036748336,"about_ca_system_score_gemma":0.0000377412,"threshold_uncertainty_score":0.9998841},"labels":[],"label_agreement":null},{"id":"W4404916251","doi":"10.1109/wccs62745.2024.10765521","title":"Optimization of Energy Costs Using Deep Reinforcement Learning in Smart Grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université TÉLUQ","funders":"","keywords":"Reinforcement learning; Computer science; Smart grid; Energy (signal processing); Reinforcement; Artificial intelligence; Engineering; Electrical engineering; Structural engineering; Mathematics","score_opus":0.00848657564078697,"score_gpt":0.20510432541093088,"score_spread":0.1966177497701439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404916251","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009771279,0.0002995846,0.9472199,0.000014270099,0.0005591634,0.000045171313,8.423921e-8,0.0003180223,0.04177254],"genre_scores_gemma":[0.9942675,0.00015917084,0.0048617967,0.000017663204,0.000053724027,0.000009675875,0.000015970387,0.00003139915,0.00058307603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993496,0.000013117453,0.00023545706,0.00011375161,0.00012929254,0.00015876206],"domain_scores_gemma":[0.9998252,0.000022294455,0.000011361412,0.000102030855,0.000013640566,0.000025498768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000108274646,0.00009878837,0.000103417566,0.0002609708,0.000013584436,0.000026775799,0.000061268045,0.000039031933,0.00020816868],"category_scores_gemma":[0.000007900224,0.00010328793,0.000029677467,0.00036217252,0.000008787616,0.00013670456,0.000043635086,0.00006986806,0.000004617096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016336097,0.000003280281,0.000267382,0.000060772727,0.000030337555,0.0000065099393,0.000047023394,0.99162525,0.00037321978,0.00545254,0.00013852857,0.0019934953],"study_design_scores_gemma":[0.000098374774,0.000013883,0.00008078428,0.00007932439,0.000009727511,0.000001155854,0.000043091393,0.99277943,0.0025029876,0.0000086727,0.004276765,0.00010581274],"about_ca_topic_score_codex":0.00023335582,"about_ca_topic_score_gemma":0.00008695269,"teacher_disagreement_score":0.98449624,"about_ca_system_score_codex":0.00023582827,"about_ca_system_score_gemma":0.000008930554,"threshold_uncertainty_score":0.42119595},"labels":[],"label_agreement":null},{"id":"W4405057640","doi":"10.2139/ssrn.4988665","title":"An Economic analysis of Local Use of System charges for neighbourhood batteries VEPC Working Paper 2109a September 2021","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Neighbourhood (mathematics); Regional science; Economic geography; Business; Geography; Mathematics","score_opus":0.01020179418467565,"score_gpt":0.21887442601307364,"score_spread":0.208672631828398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405057640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70999473,0.011930011,0.2700055,0.00012571401,0.0051348456,0.0005923916,0.00023810414,0.000254077,0.001724657],"genre_scores_gemma":[0.9964187,0.0019676327,0.00026004735,0.00000757729,0.0007679916,0.000058820275,0.000110164234,0.00013451291,0.00027454825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968208,0.00008245539,0.0009960613,0.0004336955,0.00024299967,0.0014239522],"domain_scores_gemma":[0.9987674,0.00008840762,0.00034568412,0.0006290996,0.00007434465,0.00009507127],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010723977,0.0004501128,0.0010495518,0.00088521437,0.000055189415,0.00016303852,0.00048552043,0.0002650513,0.00014783976],"category_scores_gemma":[0.000005185561,0.00045454525,0.00077985076,0.00028039844,0.00004953431,0.00017891199,0.00023633185,0.0015851018,0.000011757239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033971966,0.000023716575,0.0006629996,0.0006528398,0.014193097,0.0000030020658,0.00010632468,0.9500508,0.00021299586,0.029217437,0.0001560831,0.004686747],"study_design_scores_gemma":[0.00062760455,0.0002393891,0.0013992984,0.0012567834,0.009606955,0.000048147846,0.002575717,0.96811867,0.001535174,0.009247791,0.0042817607,0.0010627232],"about_ca_topic_score_codex":0.00015757933,"about_ca_topic_score_gemma":0.0021744666,"teacher_disagreement_score":0.286424,"about_ca_system_score_codex":0.002370173,"about_ca_system_score_gemma":0.00054613466,"threshold_uncertainty_score":0.9997906},"labels":[],"label_agreement":null},{"id":"W4405272272","doi":"10.1109/ice3is62977.2024.10775349","title":"Remote Control of Residential Meter Involving E-Billing","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Metre; Computer science; Control (management); Remote sensing; Computer security; Geography; Artificial intelligence","score_opus":0.007426354976877705,"score_gpt":0.19726410398855176,"score_spread":0.18983774901167405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405272272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048972603,0.0025997907,0.9017495,0.00016259812,0.0025250986,0.00011420429,0.0000020659954,0.0010114762,0.042862672],"genre_scores_gemma":[0.9957489,0.00007462326,0.0031656327,0.00003264613,0.00021222365,0.0000019985066,0.0000012795679,0.000029623705,0.000733073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943304,0.000009432463,0.0001836053,0.00010993545,0.00012557316,0.00013841796],"domain_scores_gemma":[0.99974066,0.000057209167,0.000006463829,0.00015691204,0.000012909315,0.000025873469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014805229,0.00008209564,0.00010847069,0.00012974204,0.000012688299,0.0000392888,0.00008508811,0.000030987434,0.00021122808],"category_scores_gemma":[0.000013186761,0.00007443594,0.000060555732,0.00013573734,0.000011651201,0.000105302155,0.000025715413,0.00006716172,0.000053585612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074730597,0.000005099732,0.00009437463,0.0005381708,0.00049291487,0.000054407843,0.0002184621,0.88919026,0.06490852,0.018148465,0.016316231,0.010025623],"study_design_scores_gemma":[0.00014036137,0.000008759702,0.00015169034,0.0000808867,0.00004375581,0.0000013935264,0.000024007866,0.9623007,0.024017984,0.0005159647,0.01260821,0.000106290696],"about_ca_topic_score_codex":0.000077019016,"about_ca_topic_score_gemma":0.000039170223,"teacher_disagreement_score":0.9467763,"about_ca_system_score_codex":0.000033228596,"about_ca_system_score_gemma":0.0000046963896,"threshold_uncertainty_score":0.30354095},"labels":[],"label_agreement":null},{"id":"W4405491980","doi":"10.1109/apee60256.2024.10790907","title":"Microgrid System Modelling for Hybrid Renewable Energy Market in Malaysia","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Universiti Teknologi Malaysia","keywords":"Microgrid; Renewable energy; Environmental economics; Computer science; Environmental science; Automotive engineering; Electrical engineering; Engineering; Economics","score_opus":0.00796157069038764,"score_gpt":0.17797855070092408,"score_spread":0.17001698001053644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405491980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048988913,0.0027773129,0.9064901,0.00004470494,0.0016810447,0.00015133485,0.000010885719,0.0013216434,0.082624085],"genre_scores_gemma":[0.97946465,0.00028128305,0.010608869,0.00003330507,0.00035679602,0.00026009194,0.000025225992,0.00010273434,0.008867015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990677,0.000010181225,0.00024663704,0.00024873685,0.00009256663,0.00033418124],"domain_scores_gemma":[0.9996642,0.000054144683,0.0000067954584,0.00021701568,0.000011385239,0.000046452653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019403723,0.00016374986,0.00016313142,0.00022735048,0.000018947276,0.00009149896,0.00013543913,0.000039032104,0.00007302861],"category_scores_gemma":[0.0000015187469,0.00016551223,0.000073507006,0.00019896973,0.0000058947808,0.00011707887,0.000036863035,0.00005066545,0.000018513227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004774769,0.000004177461,0.000008962148,0.0005014701,0.000048280956,0.000031374573,0.000008692872,0.90126055,0.00022101692,0.0046044094,0.09239437,0.0009119455],"study_design_scores_gemma":[0.000101177975,0.00000619649,0.0000015413033,0.00012351159,0.0000117767495,0.000006836214,0.00003084244,0.75676227,0.0044659968,0.0001378263,0.23820603,0.00014603103],"about_ca_topic_score_codex":0.000498659,"about_ca_topic_score_gemma":0.00010850708,"teacher_disagreement_score":0.9745658,"about_ca_system_score_codex":0.00022212406,"about_ca_system_score_gemma":0.00000915919,"threshold_uncertainty_score":0.67493933},"labels":[],"label_agreement":null},{"id":"W4405522038","doi":"10.1109/icue63019.2024.10795646","title":"A Comparative Analysis of Rule-Based and Optimization-Based Energy Management for a Campus Microgrid in Sri Lanka","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Microgrid; Sri lanka; Energy management; Computer science; Energy management system; Energy (signal processing); Operations research; Engineering; Environmental science; Artificial intelligence; Mathematics; Environmental planning; Statistics; Control (management)","score_opus":0.007935817566013331,"score_gpt":0.22517223399716238,"score_spread":0.21723641643114905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405522038","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017482875,0.00079464115,0.97525406,0.00009754871,0.00017261837,0.0002474849,0.000038070582,0.00024118785,0.0056715324],"genre_scores_gemma":[0.95507073,0.000047470006,0.044294287,0.00009188847,0.000016173532,0.00019653047,0.00017790566,0.000014851482,0.0000901628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928504,0.000014879949,0.00023637622,0.0002087383,0.000096576565,0.00015836576],"domain_scores_gemma":[0.9996565,0.000114552044,0.000016968894,0.00015731563,0.000021556672,0.000033089338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009676814,0.00013889279,0.00027496254,0.000891943,0.000014184069,0.000038207116,0.00007642094,0.00003283026,0.000066784676],"category_scores_gemma":[0.0000018077201,0.00013455526,0.00008681523,0.0010034173,0.000021473892,0.00004078136,0.000018472669,0.000029142097,8.2049957e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013570403,0.000028428401,0.00032311128,0.00020937368,0.0010253943,0.0000065328504,0.00011462682,0.99471796,0.00004384404,0.0023174125,0.0006025512,0.0005972085],"study_design_scores_gemma":[0.0004523774,0.000018565412,0.00044450452,0.00003967988,0.0004471789,6.158855e-8,0.00010653899,0.9910946,0.0014871163,0.000012861733,0.0057573193,0.00013923513],"about_ca_topic_score_codex":0.00010329636,"about_ca_topic_score_gemma":0.00041114882,"teacher_disagreement_score":0.93758786,"about_ca_system_score_codex":0.000074981974,"about_ca_system_score_gemma":0.000009305896,"threshold_uncertainty_score":0.5487004},"labels":[],"label_agreement":null},{"id":"W4405537350","doi":"10.1088/1742-6596/2929/1/012009","title":"Digital Dynamic Agent (DDA) Driven Energy Contract Negotiation","year":2024,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of Windsor","funders":"","keywords":"Negotiation; Computer science; Computer security; Business; Political science","score_opus":0.008058648765338216,"score_gpt":0.201072768308549,"score_spread":0.1930141195432108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405537350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09136015,0.0010153928,0.8856596,0.0005963211,0.0051007634,0.00007701526,0.000027873033,0.0003266866,0.015836228],"genre_scores_gemma":[0.99844795,0.00043622358,0.00019989806,0.00001822535,0.00042630718,0.0000027491192,0.000011749718,0.000028939447,0.00042797517],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992042,0.000010890322,0.00028749902,0.00008851575,0.00024835483,0.00016054558],"domain_scores_gemma":[0.99962145,0.00003359512,0.00006695763,0.000112536734,0.000103027574,0.00006241091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048019283,0.00014915888,0.00019287708,0.00008272707,0.000027317628,0.00035685432,0.00015543024,0.00003735223,0.000042037318],"category_scores_gemma":[0.000009449745,0.00013596282,0.000112352245,0.00014166275,0.000034602246,0.0012956695,0.000029154568,0.00015674617,0.00001793251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024585135,0.000049581504,0.00013993339,0.00015652868,0.0006411609,0.0001657664,0.0007129545,0.34603006,0.012546927,0.13644713,0.0028101068,0.50027525],"study_design_scores_gemma":[0.0007124958,0.0005098495,0.0052573243,0.00079604884,0.0002607462,0.00015108328,0.00071368826,0.7003837,0.059513323,0.031546358,0.19917364,0.0009817375],"about_ca_topic_score_codex":0.0000021461244,"about_ca_topic_score_gemma":0.000010003882,"teacher_disagreement_score":0.9070878,"about_ca_system_score_codex":0.00011186585,"about_ca_system_score_gemma":0.00005441877,"threshold_uncertainty_score":0.5544403},"labels":[],"label_agreement":null},{"id":"W4405583005","doi":"10.2139/ssrn.5065088","title":"Optimal Sizing and Economic Analysis of Renewables for a Remote School: An Energy Modeling Approach","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Sizing; Renewable energy; Economic analysis; Environmental economics; Energy (signal processing); Economics; Computer science; Environmental science; Engineering; Mathematics; Agricultural economics; Electrical engineering; Chemistry","score_opus":0.01194722561097712,"score_gpt":0.2256936853302476,"score_spread":0.2137464597192705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405583005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27280334,0.015145103,0.71075416,0.00003186134,0.00040125602,0.000107872496,0.000019474173,0.0001289162,0.00060803775],"genre_scores_gemma":[0.9671087,0.017176876,0.014567474,0.000008062798,0.00068550755,0.000022832493,0.00009685195,0.0001357903,0.00019789695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972517,0.000041924373,0.0006423685,0.0005032848,0.00016375307,0.0013970006],"domain_scores_gemma":[0.999228,0.000027432447,0.00014202984,0.0004177029,0.000046998262,0.0001378465],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013268657,0.00038443602,0.00069796154,0.0011019093,0.00007848813,0.00018882663,0.0004080693,0.00023279125,0.0000050486765],"category_scores_gemma":[0.000013183434,0.0004093129,0.00040151054,0.00021457703,0.00002138835,0.00011762093,0.00032928475,0.00126113,4.2719424e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002379754,0.000009507442,0.000009924228,0.00015775839,0.0069090123,9.189329e-7,0.00006955644,0.97476864,0.00007761868,0.013270958,0.00002305947,0.004679225],"study_design_scores_gemma":[0.00020042961,0.000058751004,0.0000027803649,0.000065236214,0.002319696,0.000022413084,0.00046887674,0.93880314,0.00004911552,0.057503697,0.00016467826,0.0003411818],"about_ca_topic_score_codex":0.0008842446,"about_ca_topic_score_gemma":0.0027903565,"teacher_disagreement_score":0.69618666,"about_ca_system_score_codex":0.001635187,"about_ca_system_score_gemma":0.00073735206,"threshold_uncertainty_score":0.99983585},"labels":[],"label_agreement":null},{"id":"W4405599777","doi":"10.1109/access.2024.3520357","title":"Safe Deep Reinforcement Learning-Based Real-Time Multi-Energy Management in Combined Heat and Power Microgrids","year":2024,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Social Sciences and Humanities Research Council of Canada; Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Reinforcement learning; Computer science; Energy management; Power (physics); Energy (signal processing); Power management; Reinforcement; Artificial intelligence; Engineering","score_opus":0.008669508604361359,"score_gpt":0.236029509902652,"score_spread":0.22736000129829065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405599777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52702135,0.0032394256,0.37917215,0.0007187331,0.0068793558,0.0015197978,0.0000061514042,0.0042086486,0.07723441],"genre_scores_gemma":[0.99649405,0.0006667431,0.00048183993,0.00014778641,0.00006430726,0.00015156432,0.00003678548,0.000086720735,0.0018701706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855655,0.000036366386,0.00035631945,0.00038650673,0.00022842396,0.00043584823],"domain_scores_gemma":[0.99950075,0.000050683087,0.000016233927,0.00031686478,0.000017225779,0.000098240875],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018881961,0.00029463673,0.00024064012,0.00045474718,0.000053204378,0.00028042047,0.00031207906,0.00008020506,0.00020723656],"category_scores_gemma":[0.000003480048,0.00030780208,0.000059710088,0.00045692347,0.000035476663,0.00028315446,0.00014800958,0.00016923068,0.00007107816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024368537,0.000036516478,0.0004264601,0.0002221591,0.00015352172,0.00018687619,0.000080196754,0.99200654,0.00086467003,0.0003976261,0.003323581,0.0022774863],"study_design_scores_gemma":[0.001080986,0.00006141521,0.0032977702,0.0001471742,0.000040432238,0.0000017614743,0.000019848714,0.9604643,0.0033659087,0.00002498761,0.031111682,0.00038372233],"about_ca_topic_score_codex":0.00028273134,"about_ca_topic_score_gemma":0.000109421715,"teacher_disagreement_score":0.46947274,"about_ca_system_score_codex":0.00022618823,"about_ca_system_score_gemma":0.0000086279215,"threshold_uncertainty_score":0.9999374},"labels":[],"label_agreement":null},{"id":"W4405601974","doi":"10.1109/synergymed62435.2024.10799384","title":"The nexus between design and control: a data-driven approach for leveraging flexibility potential of micro-grids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Concordia University","funders":"Hydro-Québec","keywords":"Nexus (standard); Flexibility (engineering); Computer science; Control (management); Distributed computing; Industrial engineering; Systems engineering; Embedded system; Engineering; Artificial intelligence","score_opus":0.0471630452214629,"score_gpt":0.25096781852651573,"score_spread":0.20380477330505284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405601974","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008721444,0.00076507794,0.9887043,0.00010746098,0.00028240297,0.00045428693,0.00004305931,0.00024764304,0.0006742978],"genre_scores_gemma":[0.95819235,0.00002627253,0.04129098,0.000013180186,0.0002195309,0.000044242443,0.00004967896,0.000029642537,0.00013412783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991623,0.000034570683,0.00022057966,0.00026671326,0.00010458407,0.00021121494],"domain_scores_gemma":[0.9992109,0.00026345038,0.000012749954,0.00045758925,0.000018064791,0.000037252405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000653966,0.00012347175,0.00016627605,0.000044227334,0.000066610606,0.000105298015,0.00029336792,0.000038145405,0.0000037379884],"category_scores_gemma":[0.000017873655,0.00008850233,0.00004099002,0.00008589602,0.00005081914,0.0001304571,0.00013113144,0.000078897196,0.0000012845236],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019543151,0.000008234665,0.00012424722,0.00027582474,0.0004627751,0.0000013194494,0.000078157034,0.98158777,0.0018686899,0.00085394,0.0057360185,0.008983479],"study_design_scores_gemma":[0.0003171341,0.000019394318,0.00077820057,0.000009308141,0.00011976265,0.0000013566053,0.0000550865,0.99276394,0.0010274812,0.00034053106,0.0044654217,0.00010237839],"about_ca_topic_score_codex":0.000022712218,"about_ca_topic_score_gemma":0.000001733393,"teacher_disagreement_score":0.9494709,"about_ca_system_score_codex":0.00002935725,"about_ca_system_score_gemma":0.000012350325,"threshold_uncertainty_score":0.36090204},"labels":[],"label_agreement":null},{"id":"W4405602314","doi":"10.1109/synergymed62435.2024.10799262","title":"Towards dynamic pricing algorithm for residential buildings: A Model Predictive Control framework for load aggregation","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Collège Shawinigan; University of Waterloo; Université de Sherbrooke; Concordia University","funders":"Hydro-Québec","keywords":"Model predictive control; Computer science; Control (management); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics","score_opus":0.006608502889492049,"score_gpt":0.241367918935186,"score_spread":0.23475941604569395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405602314","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000586638,0.0005654522,0.9938517,0.00022983008,0.0016387086,0.0010385885,0.00008707263,0.0011830652,0.00081889454],"genre_scores_gemma":[0.42471305,0.000060688253,0.5727791,0.000091094305,0.0005506865,0.0010774512,0.000030293186,0.00010552673,0.00059206324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887383,0.0000063709913,0.00025300082,0.00031090537,0.00022716707,0.00032870178],"domain_scores_gemma":[0.9994938,0.00016711133,0.000021169624,0.00017575394,0.00008828375,0.000053903423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000253143,0.00019398947,0.00018526473,0.00014844266,0.000066980516,0.00014236449,0.00013674037,0.00012786083,0.000011449561],"category_scores_gemma":[0.0000817246,0.00019306636,0.00013930709,0.00016886069,0.000015118877,0.00024810128,0.000028971874,0.00012124559,0.0000056672675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021082757,0.0000073287233,7.131464e-7,0.00021006011,0.0002600007,0.000001487639,0.00019094817,0.9117211,0.00018945095,0.01948208,0.0033024263,0.064613305],"study_design_scores_gemma":[0.00052673573,0.00006424524,0.0000114759605,0.00019681863,0.00014167784,0.0000011473098,0.00005742668,0.96430236,0.0010194632,0.03177435,0.0017010191,0.00020325047],"about_ca_topic_score_codex":0.000019805935,"about_ca_topic_score_gemma":0.00001540451,"teacher_disagreement_score":0.42412642,"about_ca_system_score_codex":0.00050771073,"about_ca_system_score_gemma":0.000052332358,"threshold_uncertainty_score":0.7873018},"labels":[],"label_agreement":null},{"id":"W4405720626","doi":"10.3390/en17246475","title":"Load Optimization for Connected Modern Buildings Using Deep Hybrid Machine Learning in Island Mode","year":2024,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Herzberg Institute of Astrophysics; University of Victoria","funders":"","keywords":"Mean absolute percentage error; Mean squared error; Photovoltaic system; Random forest; Smart grid; Computer science; Automotive engineering; Efficient energy use; Building automation; Artificial neural network; Real-time computing; Engineering; Artificial intelligence; Electrical engineering; Statistics; Mathematics","score_opus":0.008350669229516309,"score_gpt":0.21777362157982658,"score_spread":0.20942295235031028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405720626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3254146,0.002067468,0.67078894,0.000026287531,0.00045234594,0.00008767684,0.00000756759,0.0006334807,0.00052161823],"genre_scores_gemma":[0.97850597,0.00019288703,0.020768058,0.000013959576,0.0001414363,0.000043806744,0.00006584939,0.00007564445,0.00019240043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925023,0.000013817581,0.0001780339,0.00020652515,0.00011778664,0.00023360144],"domain_scores_gemma":[0.99976635,0.0000666473,0.000013619748,0.00010555999,0.000023128643,0.000024678744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000105449115,0.00015493599,0.00014463686,0.00020076218,0.000046823643,0.00010092187,0.00008548714,0.000038665483,0.00003241027],"category_scores_gemma":[0.000037838392,0.00016602653,0.000042444426,0.00019254326,0.000011744019,0.00020760587,0.000041064184,0.00010991817,0.0000020188188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007793186,0.0000043455734,0.000058209003,0.00011663085,0.000044406577,0.000010458445,0.0002671707,0.994078,0.001798263,0.0006616482,0.0002174819,0.002735639],"study_design_scores_gemma":[0.00026109364,0.000010680996,0.000009621315,0.000072179166,0.000020985442,0.0000035851879,0.00002615943,0.9892902,0.0036238492,0.00029430815,0.0061961995,0.00019116738],"about_ca_topic_score_codex":0.0001569211,"about_ca_topic_score_gemma":0.00023032233,"teacher_disagreement_score":0.6530914,"about_ca_system_score_codex":0.00020005064,"about_ca_system_score_gemma":0.000014273608,"threshold_uncertainty_score":0.6770365},"labels":[],"label_agreement":null},{"id":"W4405919709","doi":"10.1016/j.ijhydene.2024.12.141","title":"Eco-friendly strategic decision-making towards grid modernization with fully renewable water and power community hubs","year":2024,"lang":"en","type":"article","venue":"International Journal of Hydrogen Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Iran University of Science and Technology; Khalifa University of Science, Technology and Research","keywords":"Modernization theory; Renewable energy; Grid; Environmental economics; Power grid; Environmentally friendly; Power (physics); Business; Computer science; Environmental science; Economics; Engineering; Electrical engineering; Mathematics; Economic growth; Physics","score_opus":0.009127598173521087,"score_gpt":0.22859665773228036,"score_spread":0.21946905955875928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405919709","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84635097,0.0008303845,0.14192103,0.00017629805,0.0019806384,0.00002671941,0.000009851276,0.0001025339,0.008601553],"genre_scores_gemma":[0.9976872,0.00018530397,0.0015268767,0.000069635964,0.0003698056,0.0000033606132,0.000021145644,0.000046467263,0.00009016951],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987666,0.00004445229,0.00037576127,0.00011469911,0.000515732,0.00018274461],"domain_scores_gemma":[0.9994675,0.000065131586,0.00005341193,0.00014584366,0.00019573382,0.00007237416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029177064,0.00017358967,0.00016597923,0.00036059844,0.00006135541,0.00023893362,0.00037781888,0.00005512731,0.00013244528],"category_scores_gemma":[0.000011170909,0.00012545673,0.000066379136,0.0001073057,0.000032036973,0.00046291706,0.00010842669,0.00021600156,0.000004778818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058521375,0.000028831142,0.00004070243,0.000013752933,0.000550482,0.00030318636,0.0002682135,0.9901907,0.0017387376,0.0018705492,0.000807457,0.004128867],"study_design_scores_gemma":[0.0014175695,0.000646483,0.0002794145,0.001256474,0.00019749456,0.0027355517,0.0007401059,0.80313665,0.047970492,0.032712117,0.10804479,0.0008628644],"about_ca_topic_score_codex":0.0000930974,"about_ca_topic_score_gemma":0.00016243279,"teacher_disagreement_score":0.18705405,"about_ca_system_score_codex":0.00017837482,"about_ca_system_score_gemma":0.00004017104,"threshold_uncertainty_score":0.5115977},"labels":[],"label_agreement":null},{"id":"W4405935104","doi":"10.1109/icrera62673.2024.10815252","title":"Hybrid Renewable Energy Systems and Their Optimization for Remote Community Applications","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Renewable energy; Computer science; Electrical engineering; Engineering","score_opus":0.012479666108612224,"score_gpt":0.20126546105560925,"score_spread":0.18878579494699702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405935104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013107042,0.0010278884,0.9769442,0.00004000874,0.00028385813,0.00016881322,0.000015089815,0.00071720127,0.020671867],"genre_scores_gemma":[0.97609305,0.0005183991,0.017818084,0.000057882553,0.00026961617,0.00033677203,0.00022141162,0.00007426537,0.004610489],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964994,0.00001669247,0.00010877359,0.000086866916,0.000032734046,0.00010500845],"domain_scores_gemma":[0.9996228,0.00008638246,0.000005940691,0.00023611423,0.000017367936,0.000031370033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001286075,0.00008640471,0.00007781709,0.00006818703,0.00009115835,0.00009877279,0.00008120365,0.000022321017,0.000010188546],"category_scores_gemma":[0.000003065522,0.0000761436,0.00002013804,0.000091306225,0.000010335503,0.00007582243,0.000035237485,0.00004317005,0.0000015789841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.338544e-7,0.0000030570059,3.8416127e-7,0.0001779018,0.00003843229,1.3052636e-7,0.000020424488,0.97827053,0.00006271931,0.004174088,0.013050001,0.0042017885],"study_design_scores_gemma":[0.00004073948,0.0000062376284,0.0000010646564,0.000018988434,0.000007956433,0.0000025806971,0.000059027916,0.7852795,0.0006934501,0.0006465333,0.21317533,0.000068558504],"about_ca_topic_score_codex":0.0011215572,"about_ca_topic_score_gemma":0.00009327014,"teacher_disagreement_score":0.975962,"about_ca_system_score_codex":0.000043846227,"about_ca_system_score_gemma":0.000004046652,"threshold_uncertainty_score":0.31050462},"labels":[],"label_agreement":null},{"id":"W4405968134","doi":"10.1109/tsg.2024.3524622","title":"A Multi-Area Architecture for Real-Time Feedback-Based Optimization of Distribution Grids","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"","keywords":"Architecture; Computer science; Distribution (mathematics); Real-time computing; Distributed computing; Mathematics","score_opus":0.00904565983982121,"score_gpt":0.21586090071237485,"score_spread":0.20681524087255365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405968134","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005207112,0.000013360469,0.99075395,0.00018517312,0.0018802577,0.0005338123,0.0005558476,0.00046907156,0.0004014136],"genre_scores_gemma":[0.93351233,0.000111586676,0.06343409,0.00011584087,0.0001593392,0.0007873381,0.00075910473,0.00010674927,0.0010136222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895674,0.000029746716,0.00034207723,0.0002550148,0.00015573984,0.00026065725],"domain_scores_gemma":[0.99931115,0.00013166406,0.000041838415,0.00036640742,0.000092017326,0.00005691345],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012473708,0.00023398463,0.0002533488,0.00026689508,0.000119429686,0.000022229899,0.00015345204,0.00012408102,0.0000645585],"category_scores_gemma":[0.000008056266,0.00024906982,0.00018933337,0.0004956596,0.000046920148,0.00007412087,0.0000012701132,0.00014304358,0.000009113398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008893066,0.00014250017,0.000010740752,0.00015680309,0.00012168443,4.5301195e-7,0.000020196738,0.9896292,0.004250115,0.000019934443,0.003716587,0.0018428338],"study_design_scores_gemma":[0.0013446118,0.00008581794,0.00028977942,0.00010953975,0.00013107096,4.862424e-7,0.000010388429,0.9226846,0.06939694,0.0000101231435,0.0057214852,0.00021512307],"about_ca_topic_score_codex":0.000043605516,"about_ca_topic_score_gemma":0.000052010153,"teacher_disagreement_score":0.9283052,"about_ca_system_score_codex":0.00018262224,"about_ca_system_score_gemma":0.000036405814,"threshold_uncertainty_score":0.9999961},"labels":[],"label_agreement":null},{"id":"W4405995562","doi":"10.1038/s44284-024-00178-7","title":"Decarbonizing urban residential communities with green hydrogen systems","year":2025,"lang":"en","type":"article","venue":"Nature Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alliance de recherche numérique du Canada; China Scholarship Council; University of Alberta","keywords":"Green infrastructure; Business; Geography; Environmental planning","score_opus":0.004554744433323185,"score_gpt":0.18826270223356997,"score_spread":0.1837079578002468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405995562","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7912186,0.02232125,0.0012650661,0.00023379923,0.0029050154,0.00031876893,0.000016421081,0.0014758977,0.18024518],"genre_scores_gemma":[0.99508893,0.00007458031,0.00009092628,0.000124298,0.00028592965,0.00004922922,0.00002252604,0.00003667986,0.004226924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.999234,0.00003772636,0.0001603461,0.00010459296,0.00021507713,0.00024826187],"domain_scores_gemma":[0.99945503,0.00006510678,0.000020452828,0.00038334983,0.000046273013,0.000029770361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102049984,0.000186479,0.0001958491,0.0002532769,0.000121335936,0.00009947532,0.00030299378,0.00017233934,0.000010544924],"category_scores_gemma":[0.0000051258016,0.00017293975,0.000038133057,0.000250706,0.000067496934,0.00012686675,0.00008902032,0.00045674675,0.0000051929055],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008712972,0.000030117255,0.027424322,0.0020654423,0.0021436755,0.00011517025,0.0046034283,0.6761489,0.00058252655,0.16534494,0.1208878,0.000566581],"study_design_scores_gemma":[0.0031743995,0.00017389996,0.021159457,0.0033261369,0.0007251004,0.00005524459,0.030194974,0.15152992,0.018578231,0.0021168091,0.7664096,0.002556282],"about_ca_topic_score_codex":0.0007249721,"about_ca_topic_score_gemma":0.0008643891,"teacher_disagreement_score":0.64552176,"about_ca_system_score_codex":0.00011063537,"about_ca_system_score_gemma":0.000018744367,"threshold_uncertainty_score":0.7052278},"labels":[],"label_agreement":null},{"id":"W4406011507","doi":"10.1016/j.enbuild.2024.115209","title":"Robust peer-to-peer federated learning for non-intrusive load monitoring in smart homes","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Peer-to-peer; Peer review; Computer science; Internet privacy; Computer network; Political science","score_opus":0.008426662300074704,"score_gpt":0.21720715312687922,"score_spread":0.2087804908268045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406011507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8697464,0.00044129958,0.11641359,0.0012519425,0.00210488,0.00019035256,0.0000017509747,0.00037369019,0.009476124],"genre_scores_gemma":[0.9846758,0.00009895731,0.0029839417,0.00010983783,0.00022228804,0.0001312315,0.000009920903,0.00003717305,0.011730821],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989266,0.000012029919,0.00021061958,0.00029198892,0.00019274165,0.00036601958],"domain_scores_gemma":[0.99958783,0.00008792966,0.000020541096,0.00010709407,0.000128081,0.00006853632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027031248,0.00020683999,0.00022753981,0.0002735845,0.00015196945,0.00012946498,0.000119537915,0.00010076449,0.0000090571875],"category_scores_gemma":[0.00014195057,0.00022557871,0.00004221568,0.00040807115,0.000015801928,0.00012771637,0.00010022293,0.00013978156,0.000002342901],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033642358,0.00001357512,0.006691612,0.00006573833,0.00008928585,0.000008635345,0.00024127941,0.963494,0.0038725233,0.0028760638,0.010213139,0.012400501],"study_design_scores_gemma":[0.0014058695,0.000074890675,0.0129125435,0.0003770539,0.0000397082,0.0000020503862,0.0005661734,0.14614749,0.065202236,0.00028752215,0.7723821,0.0006023711],"about_ca_topic_score_codex":0.0002718609,"about_ca_topic_score_gemma":0.00015021776,"teacher_disagreement_score":0.8173465,"about_ca_system_score_codex":0.00018348974,"about_ca_system_score_gemma":0.00001930884,"threshold_uncertainty_score":0.9198833},"labels":[],"label_agreement":null},{"id":"W4406163629","doi":"10.1109/icvee63912.2024.10823780","title":"Design and Evaluation of On-Grid Solar Rooftop Power Plant for Tower I of Ministry 3 Building in the New Indonesian Capital City","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Indonesian; Architectural engineering; Grid; Christian ministry; Grid parity; Capital city; Photovoltaic system; Civil engineering; Environmental science; Meteorology; Photovoltaics; Engineering; Electrical engineering; Geography; Political science","score_opus":0.029164457075505995,"score_gpt":0.25952526779005286,"score_spread":0.23036081071454687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406163629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87677586,0.00043374655,0.1201859,0.00017899032,0.00054597046,0.00043335042,0.000007788687,0.00004112761,0.0013972747],"genre_scores_gemma":[0.99726737,0.000011444891,0.0025671322,0.00001636409,0.000056953202,0.000028617482,0.0000046437453,0.000011656314,0.000035845227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993744,0.000027070122,0.00016792021,0.00011183732,0.00021516035,0.00010359721],"domain_scores_gemma":[0.9996546,0.00016715848,0.000013752894,0.00013021327,0.000016325022,0.000017956745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077106926,0.000083968895,0.000099299614,0.0000948474,0.000010065585,0.000019974941,0.00008283949,0.000039419625,0.000043924552],"category_scores_gemma":[0.000020736157,0.000062588406,0.000027509455,0.000100357654,0.000011038406,0.000059725593,0.000016324058,0.000054974174,4.739553e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009569841,0.00008957473,0.0006527666,0.00033281534,0.00024708433,0.000013054346,0.0032169071,0.9409911,0.008287246,0.012935854,0.019126851,0.014011022],"study_design_scores_gemma":[0.0010666649,0.00031318038,0.0074948156,0.00023240813,0.00013387235,0.000008021918,0.00071387395,0.9319335,0.05231799,0.002596362,0.002915036,0.00027425544],"about_ca_topic_score_codex":0.000021427448,"about_ca_topic_score_gemma":0.000012602501,"teacher_disagreement_score":0.12049149,"about_ca_system_score_codex":0.00003761253,"about_ca_system_score_gemma":0.000025201294,"threshold_uncertainty_score":0.25522813},"labels":[],"label_agreement":null},{"id":"W4406278298","doi":"10.1016/j.jup.2025.101890","title":"Impact of distribution locational marginal pricing and cost-sharing pricing mechanisms on fairness, efficiency, and voltage quality in transactive energy systems","year":2025,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Transactive memory; Marginal cost; Microeconomics; Quality (philosophy); Environmental economics; Business; Distribution (mathematics); Industrial organization; Variable pricing; Energy (signal processing); Economics; Computer science; Mathematics; Knowledge management","score_opus":0.010555486695844822,"score_gpt":0.26880192028032945,"score_spread":0.2582464335844846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406278298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6336046,0.00023013091,0.36333153,0.000024593415,0.000116731615,0.00019096737,0.00007717499,0.000069107715,0.0023551693],"genre_scores_gemma":[0.999638,0.000058947553,0.000020960315,0.000010236712,0.000037898182,0.000045790588,0.000031320367,0.000011924315,0.00014492043],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900293,0.000036025,0.00031619734,0.00022095352,0.00015588941,0.00026797396],"domain_scores_gemma":[0.99956155,0.00014837678,0.000045131026,0.00016644869,0.000034691257,0.00004380737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027511548,0.0001734991,0.0002504838,0.0003103314,0.000057143763,0.000038807695,0.000090440066,0.00006313156,0.000003481911],"category_scores_gemma":[0.000055337674,0.0001747842,0.000037658887,0.00036477702,0.00006106698,0.0001194473,0.00004392106,0.00009526606,2.1946896e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006011667,0.000052450843,0.005335446,0.00061436644,0.00009119883,0.0000015787407,0.00084836374,0.48761898,0.00079334853,0.5020153,0.000027308308,0.002541525],"study_design_scores_gemma":[0.0010840989,0.00010980543,0.34785828,0.00048998423,0.000026132308,0.0000031727366,0.0015148626,0.64152884,0.0026325032,0.004230801,0.00019917908,0.0003223348],"about_ca_topic_score_codex":0.010508631,"about_ca_topic_score_gemma":0.00011254854,"teacher_disagreement_score":0.49778453,"about_ca_system_score_codex":0.0005984748,"about_ca_system_score_gemma":0.000055611603,"threshold_uncertainty_score":0.99608046},"labels":[],"label_agreement":null},{"id":"W4406431439","doi":"10.1016/s0197-2510(11)70181-4","title":"10.1016/s0197-2510(11)70181-4","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.003088030958680888,"score_gpt":0.13397992528733696,"score_spread":0.13089189432865608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406431439","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009949672,0.00005318482,0.000018318698,0.00010252662,0.00000850679,0.00011733705,0.0000044903154,0.00077807636,0.9979226],"genre_scores_gemma":[0.00043992602,6.028157e-7,0.00025392714,0.00002790953,0.00028547161,0.000034162316,0.00001279685,0.00005979648,0.9988854],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991567,0.000012555006,0.00016240506,0.00018137731,0.00016416916,0.0003227887],"domain_scores_gemma":[0.999464,0.000021278383,0.000007906897,0.0003731244,0.000013120395,0.00012060038],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00008566934,0.00016781507,0.00014281076,0.00008919464,0.000038121972,0.0000369896,0.00023134066,0.000049901035,0.99508786],"category_scores_gemma":[0.000008385189,0.00018424357,0.00004864725,0.00022358737,0.000012523646,0.00008343732,0.000042820844,0.000075553704,0.9949217],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005327918,0.000010962309,1.1953827e-7,0.000009638004,0.000025350564,0.0000061438204,0.000008256926,0.19965884,0.000029984021,0.0000020679192,0.6335366,0.16670676],"study_design_scores_gemma":[0.00014531885,0.000028206163,0.00004828299,0.000012261455,0.0000142306,0.0000024170452,5.725269e-7,0.016733434,0.00016363351,0.000003219446,0.9826264,0.00022207238],"about_ca_topic_score_codex":0.000015259035,"about_ca_topic_score_gemma":6.85636e-7,"teacher_disagreement_score":0.3490898,"about_ca_system_score_codex":0.00006750203,"about_ca_system_score_gemma":0.000004122114,"threshold_uncertainty_score":0.7513235},"labels":[],"label_agreement":null},{"id":"W4406522135","doi":"10.1109/access.2025.3531300","title":"Loads Mismatch and Network Voltage Behavior for Future Planning of Demand Response With Customer Satisfaction","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Atlantic Canada Opportunities Agency","keywords":"Customer satisfaction; Demand response; Computer science; Voltage; Business; Electrical engineering; Engineering; Marketing; Electricity","score_opus":0.009773777559578376,"score_gpt":0.26715839454828877,"score_spread":0.2573846169887104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406522135","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9181355,0.0003202338,0.07998684,0.000032646756,0.0009731263,0.00025126163,0.00000663147,0.000093851915,0.0001998676],"genre_scores_gemma":[0.9987838,0.000026885096,0.00061090966,0.000041843403,0.00020856534,0.00013121625,0.00000424856,0.000021381524,0.00017112253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99946624,0.00001404961,0.000141288,0.0001345138,0.0000799641,0.00016391951],"domain_scores_gemma":[0.9996871,0.00006682658,0.000031456664,0.0001589384,0.000028279745,0.000027398428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015033495,0.00011492827,0.00015215347,0.000099184945,0.000054325326,0.000044470944,0.00009927839,0.0000624709,0.0000057581365],"category_scores_gemma":[0.000004201133,0.000105498,0.000020109217,0.00021254398,0.00001887379,0.00016963389,0.000025104257,0.00006924237,5.537938e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075622194,0.000011399997,0.16512571,0.00028555692,0.00013395553,0.000010427561,0.0001681107,0.80230594,0.0020622865,0.0000909677,0.024086801,0.004962611],"study_design_scores_gemma":[0.0009065264,0.000047784353,0.9640589,0.00017124345,0.00014321927,0.0000029506368,0.00011082533,0.009585611,0.008616152,0.00004623752,0.016092364,0.00021819107],"about_ca_topic_score_codex":0.00002167019,"about_ca_topic_score_gemma":0.000044796318,"teacher_disagreement_score":0.7989332,"about_ca_system_score_codex":0.0000315857,"about_ca_system_score_gemma":0.000008929554,"threshold_uncertainty_score":0.43020836},"labels":[],"label_agreement":null},{"id":"W4406657552","doi":"10.1109/tia.2025.3532570","title":"A Novel Stochastic Volt/VAR/Pressure Optimization-Based Conservation Voltage Reduction Technique in Integrated Electricity and Natural Gas Systems With PV Smart Inverters","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industry Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"University of Saskatchewan","keywords":"Voltage reduction; Volt; Reduction (mathematics); Voltage; Natural gas; Electricity; Electrical engineering; Engineering; Computer science; Electronic engineering; Automotive engineering; Waste management; Mathematics","score_opus":0.006418596831305362,"score_gpt":0.19861856689761792,"score_spread":0.19219997006631256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406657552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025546437,0.000044015982,0.9947113,0.00025029827,0.00026017154,0.0014947631,0.000052387848,0.00044609685,0.00018632741],"genre_scores_gemma":[0.99268574,0.0000083999275,0.002611486,0.00007278895,0.000023589419,0.0042367354,0.000055933015,0.00003398125,0.00027136083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894553,0.000029884432,0.00031885353,0.00033724678,0.00014876224,0.00021974488],"domain_scores_gemma":[0.99935496,0.00007994779,0.000056291152,0.00033244124,0.00011732433,0.000059013848],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012227961,0.00024137222,0.0001943376,0.0006238884,0.00017595837,0.00006712651,0.00013486986,0.00030838852,0.000010586831],"category_scores_gemma":[0.0000051389698,0.00025620311,0.000027994614,0.0017864587,0.00008179568,0.00017222355,0.0000014091177,0.00086678413,0.0000014444242],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032156768,0.00011312073,0.000051115963,0.00008157872,0.000084599575,3.8590548e-7,0.00002073724,0.9945853,0.003742169,0.00024108223,0.0002276579,0.0008201418],"study_design_scores_gemma":[0.00061269186,0.000028826982,0.0002192663,0.00018299464,0.00010645771,0.000009728643,0.00012456991,0.992643,0.0051771416,0.000014454065,0.0006517892,0.00022907376],"about_ca_topic_score_codex":0.0005589469,"about_ca_topic_score_gemma":0.00012787546,"teacher_disagreement_score":0.9920998,"about_ca_system_score_codex":0.00029535833,"about_ca_system_score_gemma":0.0001017539,"threshold_uncertainty_score":0.99998903},"labels":[],"label_agreement":null},{"id":"W4406661871","doi":"10.24018/ejece.2024.8.6.652","title":"Design and Analysis of an On-Grid Solar System House in Lahore, Pakistan","year":2024,"lang":"en","type":"article","venue":"European Journal of Electrical Engineering and Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Grid; Architectural engineering; Geography; Telecommunications; Computer science; Engineering; Geodesy","score_opus":0.0069407728722389985,"score_gpt":0.19154361307963008,"score_spread":0.1846028402073911,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406661871","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27395275,0.0008118461,0.7248107,0.000005905371,0.00027091175,0.00002357105,3.2084293e-7,0.000087086075,0.00003690748],"genre_scores_gemma":[0.9869761,0.00008485647,0.012820527,0.0000066505736,0.000091597096,2.801783e-7,1.1519895e-7,0.000018720282,0.0000011816431],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910104,0.00005083575,0.00029431522,0.00015384768,0.00021964329,0.0001802917],"domain_scores_gemma":[0.9996331,0.00008242291,0.000025902227,0.00011147458,0.000026999423,0.0001201526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012276977,0.00010435263,0.00020355536,0.0010758408,0.0000204761,0.00012550235,0.00021342351,0.000010042603,3.3591567e-7],"category_scores_gemma":[0.000008685814,0.00008880221,0.000035363802,0.0016880117,0.000030073556,0.00016830492,0.00003577054,0.00017637873,5.406159e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000042569854,0.0000087361705,0.000027020873,0.000034478802,0.000076455646,0.000225362,0.000113935086,0.9789839,0.00085967674,0.000590315,0.000016371661,0.019059539],"study_design_scores_gemma":[0.00009709421,0.00027447494,0.008167291,0.00010592899,0.000051888026,0.000044965254,0.0000031944344,0.99056005,0.00046235314,0.0000016244771,0.00014187585,0.000089239256],"about_ca_topic_score_codex":7.912476e-7,"about_ca_topic_score_gemma":9.737629e-8,"teacher_disagreement_score":0.7130233,"about_ca_system_score_codex":0.00006373516,"about_ca_system_score_gemma":0.000013215613,"threshold_uncertainty_score":0.36212492},"labels":[],"label_agreement":null},{"id":"W4406670709","doi":"10.1016/b978-0-08-052042-1.50017-1","title":"10.1016/b978-0-08-052042-1.50017-1","year":2000,"lang":"en","type":"book-chapter","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Battery (electricity); Mains electricity; Electrical engineering; Computer science; Automotive battery; Engineering; Automotive engineering; Power (physics); Physics; Voltage","score_opus":0.006490412200340289,"score_gpt":0.1476237851612387,"score_spread":0.1411333729608984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406670709","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.7821428e-7,0.00036487734,0.000013189065,0.00004421422,0.000030184465,0.00030702673,0.000053660537,0.0011264283,0.99806005],"genre_scores_gemma":[0.0000013480523,0.000003980215,0.00014237559,0.00003274761,0.0008758349,0.000038608723,0.0001502113,0.00033297896,0.9984219],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99829733,0.000007780891,0.0003895235,0.00045176153,0.0003753765,0.00047825128],"domain_scores_gemma":[0.9988049,0.0000342495,0.0000439949,0.0008622324,0.000033823297,0.00022078992],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00009561054,0.0006184267,0.00050290884,0.00036594967,0.00005277512,0.000067219225,0.0004993798,0.00032773905,0.99653697],"category_scores_gemma":[0.0000062234726,0.00071865343,0.00019259476,0.00006269241,0.000034969948,0.000078728284,0.0001515578,0.000374428,0.9977345],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014253622,0.0000064621536,1.5308466e-9,0.000043298736,0.00021382941,0.000043625667,0.0000048027796,0.04573187,0.0000029181294,0.0001773209,0.6300427,0.32371897],"study_design_scores_gemma":[0.00017051843,0.000055324028,8.552756e-7,0.00012458877,0.000099369325,0.0000069974876,1.199583e-7,0.0012546715,0.000016145099,0.00010347376,0.9974063,0.0007616217],"about_ca_topic_score_codex":0.000007232024,"about_ca_topic_score_gemma":6.2215327e-7,"teacher_disagreement_score":0.36736366,"about_ca_system_score_codex":0.00020982038,"about_ca_system_score_gemma":0.000017029533,"threshold_uncertainty_score":0.99952644},"labels":[],"label_agreement":null},{"id":"W4406671889","doi":"10.1016/b978-0-08-051702-5.50009-7","title":"10.1016/b978-0-08-051702-5.50009-7","year":2000,"lang":"en","type":"book-chapter","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Computer science; Mathematics; Mathematical analysis","score_opus":0.00570467863569415,"score_gpt":0.14392816923358098,"score_spread":0.13822349059788683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406671889","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[4.2318976e-7,0.00037094543,0.000012683482,0.00004659855,0.000028499948,0.00031185127,0.000054802906,0.0011539133,0.9980203],"genre_scores_gemma":[0.0000014348979,0.0000039597307,0.00014260304,0.00003325126,0.0008533387,0.0000425778,0.00014629489,0.00033603184,0.9984405],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982762,0.000008059775,0.0003974577,0.00045567573,0.00038274465,0.00047988413],"domain_scores_gemma":[0.998806,0.00003510566,0.00004381873,0.00085303717,0.00003372712,0.00022829486],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0000951847,0.00062514405,0.00050815765,0.00037036583,0.00005181372,0.00006611049,0.0004970615,0.00033117514,0.9969335],"category_scores_gemma":[0.0000061020455,0.00072595675,0.00019556705,0.00006579909,0.000034054112,0.00007743764,0.00014701491,0.00037861062,0.99779654],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014336583,0.0000063494526,1.67571e-9,0.000043007472,0.00020490028,0.000041987798,0.000004910512,0.049223535,0.000002705224,0.0001740412,0.6461712,0.304113],"study_design_scores_gemma":[0.00016934548,0.00005767478,8.811279e-7,0.00012739959,0.00010023417,0.0000070113233,1.2560662e-7,0.0013916042,0.000015383725,0.000116847485,0.99724406,0.00076945446],"about_ca_topic_score_codex":0.0000075169364,"about_ca_topic_score_gemma":5.6676333e-7,"teacher_disagreement_score":0.35107282,"about_ca_system_score_codex":0.00022876341,"about_ca_system_score_gemma":0.000017166672,"threshold_uncertainty_score":0.99951917},"labels":[],"label_agreement":null},{"id":"W4406747467","doi":"10.1016/j.apenergy.2025.125373","title":"Quantifying spatio-temporal carbon intensity within a city using large-scale smart meter data: Unveiling the impact of behind-the-meter generation","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Japan Science and Technology Agency; Council for Science, Technology and Innovation; Swine Innovation Porc","keywords":"Metre; Intensity (physics); Scale (ratio); Environmental science; Smart meter; Carbon fibers; Engineering; Computer science; Electrical engineering; Geography; Cartography; Smart grid; Physics; Optics","score_opus":0.05359290881789199,"score_gpt":0.27695641640802904,"score_spread":0.22336350759013704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406747467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8806623,0.000121484394,0.11680882,0.00006836673,0.00081459054,0.00015309142,0.000013797508,0.00012801202,0.0012295066],"genre_scores_gemma":[0.99682635,0.000014202998,0.0024187847,0.0001779657,0.00024768955,0.000028806704,0.00019989203,0.000039599403,0.00004672924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99854916,0.000056320627,0.00046623647,0.00035955926,0.00023586619,0.00033287503],"domain_scores_gemma":[0.9986076,0.00006865427,0.00011456978,0.0011111768,0.000058417452,0.000039608087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069590274,0.0002681881,0.00032104342,0.00015014019,0.00017800835,0.00007687721,0.0004960608,0.000100896235,0.000012706745],"category_scores_gemma":[0.00001805469,0.00018594603,0.00010519743,0.0003716179,0.0000631595,0.00013034057,0.00041757475,0.00020686541,8.6062255e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030334115,0.00003273649,0.0041383714,0.000024755249,0.00040763264,0.00000149296,0.00039185764,0.9726758,0.01940565,0.0012805827,0.0012774377,0.0003333508],"study_design_scores_gemma":[0.00027685045,0.000011052043,0.0015134197,0.000020347536,0.00011712595,0.0000013756866,0.00013185626,0.9585035,0.0378698,0.00011753091,0.0012459338,0.00019122608],"about_ca_topic_score_codex":0.005081375,"about_ca_topic_score_gemma":0.0066102403,"teacher_disagreement_score":0.11616399,"about_ca_system_score_codex":0.0001726246,"about_ca_system_score_gemma":0.000043932854,"threshold_uncertainty_score":0.7681553},"labels":[],"label_agreement":null},{"id":"W4406853528","doi":"10.1080/03036758.2024.2446746","title":"The role of smart community microgrids in Aotearoa's energy future","year":2025,"lang":"en","type":"article","venue":"Journal of the Royal Society of New Zealand","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Strategic Science Fund","keywords":"Aotearoa; Environmental science; Environmental resource management; Earth science; Sociology; Geology; Gender studies","score_opus":0.0038521178592622945,"score_gpt":0.19253022017183719,"score_spread":0.1886781023125749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406853528","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9799231,0.0069562853,0.00036283224,0.0071594566,0.0019835238,0.000095344476,0.000004703001,0.000021411779,0.0034932923],"genre_scores_gemma":[0.99182713,0.0012462796,0.00051167473,0.00018708377,0.000377758,0.0000011552254,6.2791884e-7,0.000017982426,0.005830312],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911743,0.00009476071,0.00039938273,0.000037783248,0.0001982913,0.00015237657],"domain_scores_gemma":[0.9993556,0.00011942656,0.00016036212,0.00028149178,0.000048871196,0.00003423259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055644487,0.00010243961,0.00022788653,0.000030452584,0.00008438474,0.000016305137,0.0005903991,0.00007793633,0.000005643024],"category_scores_gemma":[0.000013315278,0.00006257337,0.00030382295,0.00021248554,0.000059296544,0.00003217624,0.00014214376,0.0004514465,1.7305915e-7],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006879698,0.000097464916,0.025619768,0.00007100241,0.0006724035,6.159058e-7,0.0020458426,0.2886141,0.0016829713,0.00020716395,0.66272324,0.018196644],"study_design_scores_gemma":[0.0011671731,0.00008127767,0.11409284,0.00022660043,0.000083571234,0.0000034332656,0.0020426565,0.015752103,0.009935126,0.0035940863,0.8529037,0.000117405136],"about_ca_topic_score_codex":0.000807104,"about_ca_topic_score_gemma":0.00032797144,"teacher_disagreement_score":0.272862,"about_ca_system_score_codex":0.000083115,"about_ca_system_score_gemma":0.000046396173,"threshold_uncertainty_score":0.25516677},"labels":[],"label_agreement":null},{"id":"W4406939239","doi":"10.2139/ssrn.5117154","title":"Comparison of Machine Learning and Mpc Methods for Control of Home Battery Storage Systems in Distribution Grids","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Battery (electricity); Control (management); Model predictive control; Computer science; Battery storage; Control theory (sociology); Artificial intelligence; Power (physics); Physics; Thermodynamics","score_opus":0.010080282704014194,"score_gpt":0.29910303804809696,"score_spread":0.2890227553440828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406939239","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03734528,0.038860783,0.922207,0.000038127317,0.0010345218,0.00035180902,0.00008220255,0.000035796882,0.000044464356],"genre_scores_gemma":[0.99502313,0.0038611803,0.000700562,0.0000016838909,0.00013421777,0.000049410763,0.000113231006,0.000027409704,0.00008917628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770814,0.00027730796,0.00079222315,0.00019997747,0.00015454592,0.0008677789],"domain_scores_gemma":[0.9991293,0.00025462356,0.0003369453,0.00016217414,0.00007892679,0.000038031514],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003016857,0.0002498717,0.00085690455,0.00029985022,0.00004052922,0.000028695444,0.00022231178,0.00018574187,0.0000023324012],"category_scores_gemma":[0.000085578286,0.00025923044,0.00013662118,0.00013236442,0.000027493232,0.000049285725,0.00011564834,0.0022849352,1.0364078e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006130491,0.000031932475,0.009199002,0.0010128067,0.00057059043,4.5238448e-7,0.00006418598,0.97595525,0.00037790425,0.0063039945,0.000032082295,0.0063904864],"study_design_scores_gemma":[0.0013411727,0.00017764237,0.0013724037,0.00045487544,0.00020748221,0.000011193925,0.00031081415,0.9902468,0.00024169989,0.0033263904,0.0020712083,0.00023834946],"about_ca_topic_score_codex":0.0001349171,"about_ca_topic_score_gemma":0.00011621236,"teacher_disagreement_score":0.95767784,"about_ca_system_score_codex":0.0011302717,"about_ca_system_score_gemma":0.00025378753,"threshold_uncertainty_score":0.999986},"labels":[],"label_agreement":null},{"id":"W4407029533","doi":"10.1016/j.epsr.2025.111451","title":"Peer-to-peer energy management of distributed ledgers in renewable smart energy systems","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Peer-to-peer; Distributed generation; Distributed ledger; Distributed computing; Energy management; Computer science; Ledger; Environmental economics; Energy (signal processing); Business; Computer security; Electrical engineering; Blockchain; Engineering; Economics; Physics; Accounting","score_opus":0.016049710418721514,"score_gpt":0.2750524720702631,"score_spread":0.2590027616515416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407029533","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026037334,0.025221974,0.45270213,0.0013963995,0.011934504,0.0025813743,0.000105372455,0.001148995,0.4788719],"genre_scores_gemma":[0.91248363,0.00029858292,0.000033347464,0.000013248755,0.00006458657,0.0008232891,0.00006708148,0.00006679184,0.086149424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944314,0.0004287635,0.00092768174,0.0006318848,0.002148924,0.0014313578],"domain_scores_gemma":[0.997691,0.00018966112,0.00005741618,0.0010764399,0.00076714956,0.00021834043],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0030760495,0.00035542643,0.00063612347,0.0026320645,0.00011250978,0.00017526055,0.0009635305,0.00020566127,0.000019562118],"category_scores_gemma":[0.00012838663,0.00037705328,0.00009815428,0.006914574,0.000040360053,0.00012607215,0.00033702393,0.00033217383,0.000032385116],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053298212,0.00011057293,0.0003555384,0.00071530696,0.0004872459,0.000116772346,0.00006729657,0.6106782,0.0010222716,0.023694871,0.3618057,0.00089292607],"study_design_scores_gemma":[0.00081532035,0.00012419981,0.0011881873,0.0006653271,0.000022785613,0.0000048386833,0.00048214692,0.16571695,0.0036575887,0.00007609499,0.8268332,0.00041336915],"about_ca_topic_score_codex":0.01606369,"about_ca_topic_score_gemma":0.00033785152,"teacher_disagreement_score":0.8864463,"about_ca_system_score_codex":0.0015275567,"about_ca_system_score_gemma":0.00010779435,"threshold_uncertainty_score":0.99986815},"labels":[],"label_agreement":null},{"id":"W4407264202","doi":"10.1016/j.energy.2025.134778","title":"Risk-aware distributed chance constrained energy coordination in energy communities","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Université du Québec à Trois-Rivières","keywords":"Energy (signal processing); Distributed generation; Computer science; Business; Environmental economics; Risk analysis (engineering); Engineering; Renewable energy; Economics; Physics; Electrical engineering","score_opus":0.004930994020926434,"score_gpt":0.1884949708451289,"score_spread":0.18356397682420247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407264202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015334542,0.0016046589,0.9512826,0.00052375684,0.0018257782,0.000056602523,0.00011231412,0.0009701762,0.028289579],"genre_scores_gemma":[0.9957418,0.00088069687,0.00010024826,0.0002749529,0.00010951567,0.00016558796,0.0005819866,0.000040199127,0.002105035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986728,0.00013516762,0.00038442842,0.0002109164,0.00017467924,0.00042202053],"domain_scores_gemma":[0.9991743,0.00015492206,0.00006217227,0.00048777144,0.000060795293,0.000060040333],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001344124,0.00029356475,0.0003093497,0.00043980335,0.0001178652,0.00005213728,0.00036349462,0.00014474535,0.000076172306],"category_scores_gemma":[0.000022579256,0.00034070705,0.000072481824,0.0008019538,0.000088464585,0.00015334913,0.00013980798,0.0001494604,0.0000025955114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011676496,0.000044677265,0.000579734,0.00002396999,0.00010957139,0.000012964566,0.00006431509,0.80099297,0.0001133228,0.17395146,0.011252888,0.012842428],"study_design_scores_gemma":[0.00081152143,0.000021877948,0.0021881051,0.00009851412,0.000023731833,0.0000016350335,0.0003887502,0.60233253,0.0055195647,0.0024456854,0.38579103,0.00037702572],"about_ca_topic_score_codex":0.00592865,"about_ca_topic_score_gemma":0.01026573,"teacher_disagreement_score":0.98040724,"about_ca_system_score_codex":0.00028691225,"about_ca_system_score_gemma":0.000031262898,"threshold_uncertainty_score":0.9999045},"labels":[],"label_agreement":null},{"id":"W4407275037","doi":"10.1016/j.enbuild.2025.115404","title":"A two-stage probabilistic flexibility management model for aggregated residential buildings","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Marie Sklodowska-Curie Actions; Fundação para a Ciência e a Tecnologia; Canadian Thoracic Society","keywords":"Flexibility (engineering); Probabilistic logic; Stage (stratigraphy); Architectural engineering; Computer science; Environmental science; Engineering; Mathematics; Artificial intelligence; Statistics","score_opus":0.011160086688383104,"score_gpt":0.2394966996272611,"score_spread":0.228336612938878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407275037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.242366,0.0006427553,0.74358886,0.00023558123,0.00074883085,0.0004412173,0.000019287567,0.0008180103,0.011139423],"genre_scores_gemma":[0.9631062,0.00022711487,0.021988528,0.0002742958,0.00010083087,0.00034355387,0.00003002948,0.00005091863,0.013878524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851483,0.000016591968,0.00034847535,0.00051985297,0.00016245872,0.00043779213],"domain_scores_gemma":[0.9993842,0.00005782969,0.000043414206,0.00038237637,0.000048925936,0.000083244224],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029708215,0.00028952656,0.00026361694,0.00026014485,0.00017410569,0.000107518565,0.00025946644,0.000092805545,0.000014676846],"category_scores_gemma":[0.000032277618,0.00030459632,0.000095635914,0.00034004115,0.00007674173,0.00017200541,0.0002105996,0.00008730434,0.0000010609587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047028887,0.000023238163,0.000026760928,0.00026242604,0.00013309547,0.0000041460053,0.00003421508,0.57595915,0.0008221422,0.41482344,0.0042235805,0.0036408154],"study_design_scores_gemma":[0.0012078133,0.000022062333,0.00014856992,0.00011208437,0.00013658383,0.000001084933,0.000033226224,0.8990046,0.006140632,0.021490598,0.07135189,0.0003508656],"about_ca_topic_score_codex":0.00011988723,"about_ca_topic_score_gemma":0.00012436722,"teacher_disagreement_score":0.72160035,"about_ca_system_score_codex":0.00014538121,"about_ca_system_score_gemma":0.000014650968,"threshold_uncertainty_score":0.99994063},"labels":[],"label_agreement":null},{"id":"W4407317635","doi":"10.1016/j.biortech.2025.132210","title":"Bayesian Optimization-Enhanced Reinforcement learning for Self-adaptive and multi-objective control of wastewater treatment","year":2025,"lang":"en","type":"article","venue":"Bioresource Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Outstanding Youth Science Fund Project of National Natural Science Foundation of China; National Natural Science Foundation of China","keywords":"Reinforcement learning; Sewage treatment; Process (computing); Wastewater; Computer science; Control (management); Activated sludge; Engineering; Environmental engineering; Artificial intelligence","score_opus":0.0047168758087401605,"score_gpt":0.2002777553081162,"score_spread":0.19556087949937603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407317635","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027192483,0.0002574986,0.970215,0.00012411294,0.00009235277,0.00068423885,0.0000026555779,0.00064432126,0.0007872981],"genre_scores_gemma":[0.97257656,0.00006882366,0.026576184,0.000013851804,0.0000136791305,0.00037180266,0.0000066061393,0.000023595287,0.0003488708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999265,0.000013225384,0.00022600178,0.00021308832,0.000049440132,0.00023323242],"domain_scores_gemma":[0.99963534,0.000048992122,0.000050793908,0.00019504558,0.000046594007,0.000023245177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005379642,0.00017830027,0.00025921428,0.00042122195,0.00006666918,0.000008082355,0.0000987525,0.00014759487,0.0000066270813],"category_scores_gemma":[0.000023790246,0.00016605627,0.000043683627,0.00024298858,0.00006891389,0.000028050494,0.00004730228,0.00006900177,9.997868e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004164788,0.000031166815,0.00036554047,0.00003847258,0.00037571337,7.151511e-7,0.0002527806,0.99201673,0.0027739261,0.0012383348,0.00002369359,0.0028412642],"study_design_scores_gemma":[0.002271877,0.0003385547,0.00010386854,0.00003093325,0.0000918604,5.2084977e-7,0.0005613682,0.92747134,0.06637952,0.000037224017,0.0025787428,0.00013418755],"about_ca_topic_score_codex":0.000011044757,"about_ca_topic_score_gemma":0.000007751524,"teacher_disagreement_score":0.9453841,"about_ca_system_score_codex":0.00017441556,"about_ca_system_score_gemma":0.000010667599,"threshold_uncertainty_score":0.6771578},"labels":[],"label_agreement":null},{"id":"W4407360884","doi":"10.1109/isgteurope62998.2024.10863272","title":"Droop Control of Heat Pumps in Integrated Electricity and District Heating Systems in Remote Community Microgrids","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Voltage droop; Electricity; Environmental science; Microgrid; Control (management); Heat pump; Distributed power generation; Heating system; Automotive engineering; Computer science; Electrical engineering; Distributed generation; Engineering; Mechanical engineering; Voltage; Renewable energy; Voltage regulator","score_opus":0.007885275336583756,"score_gpt":0.20523748671905015,"score_spread":0.1973522113824664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407360884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9653259,0.0031309344,0.028179636,0.000032583484,0.00024691084,0.00022929488,0.0000073495876,0.00023922959,0.0026081859],"genre_scores_gemma":[0.9996126,0.00014584142,0.0001333325,0.000012006323,0.000020219553,0.0000092413065,0.000011654813,0.000021260556,0.00003380413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999054,0.00014376888,0.000370731,0.00011750086,0.000088941546,0.00022503226],"domain_scores_gemma":[0.9995324,0.0002208103,0.000009367251,0.00018734473,0.000016050362,0.000034044246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005655882,0.00014346275,0.00027573458,0.00031886663,0.00002102619,0.00005269587,0.000111241825,0.00006386901,0.0000050146164],"category_scores_gemma":[0.000040880965,0.00013181633,0.000025808624,0.0008257101,0.000021180073,0.000084158695,0.00003884878,0.00041768522,0.0000018705365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018202198,0.00005325817,0.014017339,0.0009525396,0.00009991547,0.00003537575,0.00037269155,0.9576065,0.012857229,0.00083082495,0.0002071869,0.012948966],"study_design_scores_gemma":[0.0003864681,0.000033420736,0.010984465,0.00028041322,0.00000966712,0.0000052738824,0.00024296551,0.9859151,0.0016091062,0.000024204317,0.00038959275,0.00011928278],"about_ca_topic_score_codex":0.047055732,"about_ca_topic_score_gemma":0.0023494407,"teacher_disagreement_score":0.044706292,"about_ca_system_score_codex":0.0002356195,"about_ca_system_score_gemma":0.000011077311,"threshold_uncertainty_score":0.95929},"labels":[],"label_agreement":null},{"id":"W4407376241","doi":"10.1109/isgteurope62998.2024.10863766","title":"From Hourly to Quarter-Hourly: Effects of Metering Intervals on Self-Consumption Ratios and Economic Viability of Solar Photovoltaic Systems in Finnish Residential Buildings","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Metering mode; Quarter (Canadian coin); Net metering; Consumption (sociology); Environmental science; Automotive engineering; Engineering; Meteorology; Environmental economics; Architectural engineering; Electrical engineering; Renewable energy; Economics; Geography; Distributed generation; Mechanical engineering","score_opus":0.0059090106950199705,"score_gpt":0.21241282143083443,"score_spread":0.20650381073581445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407376241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98861814,0.00026070583,0.008979572,0.00001381492,0.001326441,0.00048554107,0.000017981876,0.00022631645,0.00007151182],"genre_scores_gemma":[0.99883926,0.000032562373,0.0009078394,0.0000076221177,0.000093196446,0.0000734254,0.000004901081,0.000031327858,0.000009880964],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988812,0.00006151282,0.00048109287,0.00030173213,0.000109734116,0.00016469626],"domain_scores_gemma":[0.99938536,0.000255047,0.000037790953,0.00026056365,0.000010949093,0.000050314604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033784006,0.0001715065,0.00033744494,0.00030886894,0.000010836424,0.00007772421,0.000115340416,0.00006746107,0.000023406104],"category_scores_gemma":[0.000021255762,0.0001809058,0.000058161633,0.00009024992,0.000014015922,0.00021244126,0.000065631946,0.00009415148,0.000018309605],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007687617,0.00007605292,0.015160126,0.0060257576,0.0006229476,0.000026079546,0.0031028755,0.33168533,0.63792956,0.0005964423,0.0034181098,0.0012798428],"study_design_scores_gemma":[0.0008160506,0.00039355154,0.0725671,0.0017374645,0.00012285105,0.0000020413231,0.00020064219,0.3705577,0.5522667,0.00013621245,0.0007526747,0.00044700853],"about_ca_topic_score_codex":0.005688399,"about_ca_topic_score_gemma":0.0008166797,"teacher_disagreement_score":0.08566282,"about_ca_system_score_codex":0.00021882223,"about_ca_system_score_gemma":0.0000083098475,"threshold_uncertainty_score":0.8599196},"labels":[],"label_agreement":null},{"id":"W4407378630","doi":"10.1109/isgteurope62998.2024.10863604","title":"Equitable Distribution of Community Energy Resources for Underprivileged Households","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Université Laval","funders":"","keywords":"Distribution (mathematics); Energy (signal processing); Computer science; Socioeconomics; Economics; Mathematics; Statistics","score_opus":0.020641382043484587,"score_gpt":0.22493100034817523,"score_spread":0.20428961830469064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407378630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2010494,0.00059168553,0.7750967,0.0001035765,0.0006848965,0.000082639315,0.000066605484,0.0010975415,0.021226967],"genre_scores_gemma":[0.9985158,0.00003919977,0.00023772415,0.000023032928,0.00007727109,0.000038696442,0.000084784755,0.000029150598,0.0009543468],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947816,0.0000236938,0.00015319727,0.000061085855,0.00008963698,0.00019422226],"domain_scores_gemma":[0.9995567,0.00014625766,0.000007971427,0.00024482294,0.000015748328,0.000028463557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024378783,0.00009031559,0.00010774822,0.000041619594,0.00006254431,0.000035771343,0.00014975644,0.00004450674,0.000028368695],"category_scores_gemma":[0.000012313203,0.00008576001,0.000057777004,0.00017725963,0.000022723625,0.00008797059,0.00008113891,0.000073291085,0.0000030684832],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010665213,0.000053464682,0.000052263196,0.00079110643,0.00027052496,0.0000014513932,0.0003318968,0.5015981,0.004122424,0.25625178,0.22659743,0.009918874],"study_design_scores_gemma":[0.00024356946,0.000083783256,0.0011183177,0.00007797729,0.00005834669,0.0000013151218,0.00048131243,0.24831875,0.028172988,0.0042049387,0.71700037,0.00023833005],"about_ca_topic_score_codex":0.00027946202,"about_ca_topic_score_gemma":0.00021638138,"teacher_disagreement_score":0.7974664,"about_ca_system_score_codex":0.00008154171,"about_ca_system_score_gemma":0.000005042973,"threshold_uncertainty_score":0.34971917},"labels":[],"label_agreement":null},{"id":"W4407572722","doi":"10.1002/9781394191529.ch22","title":"Transactive Energy Management and Distribution System Reform Using Market Concepts","year":2025,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator; Ontario Power Generation","funders":"","keywords":"Transactive memory; Business; Distribution (mathematics); Environmental economics; Computer science; Process management; Knowledge management; Economics; Mathematics","score_opus":0.004018220875900182,"score_gpt":0.19100951048607973,"score_spread":0.18699128961017955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407572722","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000015894498,0.00053706684,0.3348038,0.000004436749,0.00061109447,0.00012676216,0.00006974959,0.0006539725,0.66319156],"genre_scores_gemma":[0.013253307,0.00093272974,0.001630376,0.00002633132,0.00017992237,0.00006693141,0.00015257407,0.00028931073,0.98346853],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991323,0.000019722112,0.00017774382,0.0002751166,0.00016357432,0.00023158189],"domain_scores_gemma":[0.9996274,0.000007080647,0.000034380904,0.00027206805,0.000009579596,0.000049469527],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006166097,0.00029920271,0.00027802945,0.00018001757,0.000029856401,0.000035437173,0.00012498784,0.00017089503,0.000544961],"category_scores_gemma":[4.1227935e-7,0.0002900298,0.0000508141,0.0001406268,0.000025582516,0.000035491055,0.00005327625,0.00007076751,0.000005219596],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013679082,0.000015724425,0.0000047591698,0.0032313669,0.0017225775,0.00005909428,0.000010699599,0.006542588,0.0000041675894,0.1539857,0.82418376,0.010225886],"study_design_scores_gemma":[0.00032709094,0.000006405937,0.000044763794,0.00075401436,0.00020260738,0.0000027062965,0.00027890006,0.07034393,0.000081520644,0.000011965382,0.9275809,0.00036521134],"about_ca_topic_score_codex":0.0010778294,"about_ca_topic_score_gemma":0.00017732345,"teacher_disagreement_score":0.3331734,"about_ca_system_score_codex":0.001121752,"about_ca_system_score_gemma":0.0000059792856,"threshold_uncertainty_score":0.9999552},"labels":[],"label_agreement":null},{"id":"W4407694919","doi":"10.3998/mpub.14606494","title":"Drift Net","year":2025,"lang":"en","type":"book","venue":"Lever Press eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Warwick; Princeton University; University of Minnesota; University of Alberta; West Virginia University; Harvard University","keywords":"Geography; Computer science; Environmental science","score_opus":0.013858816562564411,"score_gpt":0.19175292272303449,"score_spread":0.17789410616047008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407694919","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000001928153,0.00070534594,0.002390438,0.000006258886,0.002583399,0.00026767064,0.000035477504,0.0009112728,0.9930982],"genre_scores_gemma":[0.00008259269,0.000060676393,0.00022686718,0.00019293767,0.0006767875,0.00010279425,0.00007225117,0.000111865025,0.9984732],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988276,0.00001481645,0.00026623058,0.00031571506,0.0002447197,0.00033095854],"domain_scores_gemma":[0.99908227,0.0000421313,0.000035687885,0.0007498764,0.000023562428,0.00006648685],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000057513247,0.0003986722,0.000344061,0.0001388828,0.00003346554,0.00006374609,0.00045811635,0.00032695386,0.00007225003],"category_scores_gemma":[0.0000038578055,0.00044708193,0.00012864983,0.000008836649,0.00003444158,0.00003146187,0.0002455213,0.00042481045,0.00006939577],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002283625,0.000002422709,4.7516815e-7,0.0004122314,0.00031174245,0.000033500637,0.000055484616,0.028134733,0.0000047575745,0.03807977,0.927796,0.0051665828],"study_design_scores_gemma":[0.00017401992,0.0000059977087,0.0000108646,0.00020079695,0.00010414907,9.865124e-7,6.4679585e-7,0.0024563519,0.00026247278,0.0011672482,0.99521565,0.00040082267],"about_ca_topic_score_codex":0.000036348687,"about_ca_topic_score_gemma":0.000022171625,"teacher_disagreement_score":0.067419626,"about_ca_system_score_codex":0.00017444021,"about_ca_system_score_gemma":0.00005169378,"threshold_uncertainty_score":0.9997981},"labels":[],"label_agreement":null},{"id":"W4407736601","doi":"10.1109/access.2025.3543760","title":"Adaptive Pricing-Based Optimized Resource Utilization in Networked Microgrids","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Electric System Operator","keywords":"Computer science; Resource management (computing); Environmental economics; Computer network; Resource (disambiguation); Distributed computing","score_opus":0.02740583594214211,"score_gpt":0.27073192283162295,"score_spread":0.24332608688948085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407736601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12617204,0.00065624615,0.83597594,0.00020227682,0.0018511799,0.00055887445,0.0000027439464,0.0007678987,0.033812802],"genre_scores_gemma":[0.9977504,0.000032709282,0.0013569448,0.00036784794,0.00010264778,0.00008757148,0.000016899148,0.00003061608,0.00025435793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991438,0.000043361702,0.00024096662,0.000206152,0.00010825006,0.00025746605],"domain_scores_gemma":[0.9995709,0.00007699863,0.000026853224,0.00027069528,0.000025032787,0.000029510857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016132565,0.00015165546,0.00017782033,0.00030385552,0.00003564874,0.0000762514,0.0003473109,0.0000726734,0.000022497703],"category_scores_gemma":[0.000013940158,0.00016613973,0.000038393824,0.000933059,0.000020529538,0.00014924661,0.00005334787,0.00012345698,0.000006482168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004460928,0.000023194105,0.0010112742,0.000035647216,0.000030172654,0.0000063473058,0.000024597068,0.98237735,0.00007095257,0.00008083586,0.012345049,0.003949956],"study_design_scores_gemma":[0.0010412198,0.000008943372,0.004853087,0.00012334535,0.000019175746,1.1476788e-7,0.000019763997,0.9682019,0.006291121,0.000052419713,0.0192234,0.00016550993],"about_ca_topic_score_codex":0.000060243045,"about_ca_topic_score_gemma":0.00008642701,"teacher_disagreement_score":0.87157834,"about_ca_system_score_codex":0.00016341193,"about_ca_system_score_gemma":0.000018960382,"threshold_uncertainty_score":0.6774981},"labels":[],"label_agreement":null},{"id":"W4407737064","doi":"10.1109/eesat62935.2025.10891235","title":"Field Data-Driven Discrete-Event Simulation of Residential PV/ Energy Storage Systems in Cold Climate Regions","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); National Research Council Canada","funders":"","keywords":"Photovoltaic system; Discrete event simulation; Environmental science; Computer science; Field (mathematics); Transient climate simulation; Event (particle physics); Climate change; Meteorology; Climate model; Simulation; Engineering; Geography; Electrical engineering; Physics; Geology","score_opus":0.014640252448782903,"score_gpt":0.25821208530460993,"score_spread":0.24357183285582704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407737064","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024140388,0.00033340353,0.9520599,0.0002485916,0.0020443697,0.00028022123,0.000032704742,0.00030441047,0.020555984],"genre_scores_gemma":[0.9987544,0.00014644438,0.0001361138,0.000034541532,0.0000634705,0.000023330897,0.00006591846,0.000014625929,0.00076114753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990808,0.00003843051,0.0003597321,0.00019292663,0.00014376266,0.00018438141],"domain_scores_gemma":[0.99916106,0.00012202674,0.000037088175,0.00063610566,0.00001831263,0.000025383402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001411574,0.00010853973,0.00018235986,0.00024859095,0.00002459601,0.000026892169,0.00028289348,0.00006417942,0.000024114228],"category_scores_gemma":[0.000024229654,0.00011234502,0.00003068953,0.0002968094,0.000010280676,0.00016570937,0.00024287774,0.000063781605,0.0000031019772],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008948145,0.000013826028,0.0003397756,0.00012116546,0.00004494309,0.0000061408027,0.000017692571,0.9584076,0.00020374899,0.03112994,0.00964576,0.000060450173],"study_design_scores_gemma":[0.00023980292,0.00001445386,0.0006450721,0.00012095671,0.000023526036,1.2134379e-7,0.000058122554,0.9746676,0.0005875975,0.00003167891,0.023512028,0.00009901219],"about_ca_topic_score_codex":0.0012587649,"about_ca_topic_score_gemma":0.0017597903,"teacher_disagreement_score":0.974614,"about_ca_system_score_codex":0.00008023986,"about_ca_system_score_gemma":0.000010878485,"threshold_uncertainty_score":0.4581297},"labels":[],"label_agreement":null},{"id":"W4407752843","doi":"10.2139/ssrn.5144493","title":"Integrating Energy Modeling and Decision-Making for Optimizing Sustainable Off-Grid Education Via Hybrid Systems","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Sustainable energy; Grid; Computer science; Energy (signal processing); Energy system; Environmental economics; Systems engineering; Renewable energy; Engineering; Electrical engineering; Geography; Economics; Mathematics","score_opus":0.0045052473735288905,"score_gpt":0.22838747048772337,"score_spread":0.22388222311419448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407752843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006839494,0.039864298,0.9478729,0.00003731614,0.0035460517,0.00040257644,0.000011500883,0.00019249978,0.0012333768],"genre_scores_gemma":[0.9637559,0.014556025,0.017816333,0.000043608237,0.0023340464,0.0004271931,0.00010848569,0.00014626929,0.00081215415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962012,0.00005170077,0.00076470734,0.00047880082,0.0002878283,0.002215741],"domain_scores_gemma":[0.9987548,0.00019576831,0.00022528213,0.00038058255,0.00035198202,0.00009161094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015321778,0.0004900646,0.00051966193,0.0006976624,0.00036838697,0.0005123554,0.0005006016,0.00020081428,0.000003779959],"category_scores_gemma":[0.00016583093,0.00052021624,0.00019457981,0.00017274487,0.000011950862,0.00026518977,0.00042930938,0.0021145956,6.233126e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018960303,0.00001456488,0.0000033750835,0.00039109294,0.0003234237,0.0000026378211,0.00005180139,0.842847,0.000006751461,0.048551284,0.0005401412,0.10724898],"study_design_scores_gemma":[0.00020162704,0.000034087334,3.0237456e-7,0.0015698029,0.00012519048,0.00012817551,0.0027598708,0.85378045,0.000013667453,0.1377987,0.0031980483,0.00039007055],"about_ca_topic_score_codex":0.0002448572,"about_ca_topic_score_gemma":0.0001585819,"teacher_disagreement_score":0.9569164,"about_ca_system_score_codex":0.004168413,"about_ca_system_score_gemma":0.0024285186,"threshold_uncertainty_score":0.9997249},"labels":[],"label_agreement":null},{"id":"W4407758877","doi":"10.1016/j.epsr.2025.111526","title":"Distributed continuous-time unit commitment with energy storage in multi-area networks","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Unit (ring theory); Energy storage; Distributed generation; Power system simulation; Energy (signal processing); Computer science; Environmental science; Electrical engineering; Engineering; Renewable energy; Power (physics); Electric power system; Physics; Mathematics","score_opus":0.020487042509013197,"score_gpt":0.264112542190162,"score_spread":0.2436254996811488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407758877","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05841286,0.010615636,0.8988502,0.0001620175,0.0011764,0.0015663386,0.000022816143,0.0008492899,0.02834445],"genre_scores_gemma":[0.9916664,0.00014132989,0.000029368142,0.00001622936,0.00003609118,0.00046528384,0.00006714296,0.00005461359,0.007523552],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970024,0.00043602206,0.00041402175,0.0003950633,0.00062274566,0.0011297292],"domain_scores_gemma":[0.99872994,0.00025506553,0.000031738753,0.0006569512,0.00019159276,0.00013471802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012140516,0.0002760168,0.00043247707,0.0010618848,0.00012748764,0.00016056688,0.00053041807,0.00015718321,0.000036131303],"category_scores_gemma":[0.00004321994,0.00025210239,0.00004244314,0.0035019126,0.000046544163,0.000095422976,0.00014501718,0.0006206353,0.000033568016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000792126,0.00020245311,0.004061858,0.00009762831,0.00036872766,0.00025899734,0.00005942909,0.9348467,0.00042923604,0.002195649,0.056634516,0.00076557114],"study_design_scores_gemma":[0.001213522,0.00014224907,0.0056006745,0.00021641643,0.000009738799,0.0000053426998,0.000095398434,0.8947318,0.00021990355,0.0000056859117,0.0974878,0.00027145492],"about_ca_topic_score_codex":0.0011456261,"about_ca_topic_score_gemma":0.00023780976,"teacher_disagreement_score":0.9332535,"about_ca_system_score_codex":0.0009573846,"about_ca_system_score_gemma":0.000087209286,"threshold_uncertainty_score":0.99999315},"labels":[],"label_agreement":null},{"id":"W4407832187","doi":"10.1109/gridedge61154.2025.10887411","title":"Preventing Arbitrage to Enable Preferences in Distributed Peer-to-Peer Electricity Trading","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Arbitrage; Peer-to-peer; Electricity; Computer science; Business; Distributed computing; Finance; Electrical engineering; Engineering","score_opus":0.010300448271044692,"score_gpt":0.22797607487194718,"score_spread":0.21767562660090248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407832187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6664706,0.00004489272,0.18627964,0.001230203,0.00054759486,0.00045940088,0.000009183949,0.00059942895,0.14435908],"genre_scores_gemma":[0.9890325,0.0000029020098,0.002324014,0.0001799787,0.000047817968,0.000096193326,0.000020510497,0.000015905209,0.008280166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987306,0.000021461321,0.00027272583,0.00025930317,0.00025874586,0.0004571848],"domain_scores_gemma":[0.9995914,0.000058224512,0.000011026786,0.00021208273,0.00004543622,0.00008184578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039998133,0.00016499843,0.00019125333,0.00035550434,0.000042868804,0.00008189017,0.0002580949,0.000051604286,0.000109843546],"category_scores_gemma":[0.00017101227,0.0001697667,0.000038234022,0.0013484634,0.0000039731262,0.00011087799,0.00008454142,0.0001827269,0.000030349478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012304485,0.00008608805,0.012640552,0.00017728916,0.00012608846,0.000013917951,0.00037173164,0.8279782,0.005855596,0.0070262174,0.14000481,0.005707201],"study_design_scores_gemma":[0.0010702045,0.00011213772,0.1202732,0.00040731573,0.000071776005,0.0000014719567,0.000531821,0.42251822,0.18209967,0.0038755552,0.2677569,0.0012817092],"about_ca_topic_score_codex":0.00023589811,"about_ca_topic_score_gemma":0.0005525225,"teacher_disagreement_score":0.40546,"about_ca_system_score_codex":0.00022870071,"about_ca_system_score_gemma":0.000017304359,"threshold_uncertainty_score":0.6922885},"labels":[],"label_agreement":null},{"id":"W4407852413","doi":"10.1016/j.energy.2025.135223","title":"Monthly and quarter-hourly hydro scheduling for assessing retrofit of conventional to reversible turbines with wind and PV integration","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental science; Wind power; Quarter (Canadian coin); Photovoltaic system; Marine engineering; Meteorology; Automotive engineering; Engineering; Electrical engineering; Geography","score_opus":0.006445165013631066,"score_gpt":0.2136443017629942,"score_spread":0.20719913674936313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407852413","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69724226,0.00034143182,0.29913476,0.00032195004,0.00024241584,0.000078610356,0.000004796036,0.000059972073,0.002573839],"genre_scores_gemma":[0.9849892,0.000012059562,0.014545518,0.00006211603,0.000053491953,0.000016299693,0.000018978018,0.000012566361,0.00028976423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954236,0.000008435778,0.00013409983,0.00013834565,0.000073054085,0.00010368688],"domain_scores_gemma":[0.9997771,0.000042453696,0.000018163719,0.00009096728,0.00004061324,0.000030730578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008161256,0.00009406045,0.00012760938,0.0001484075,0.00004183162,0.000041400028,0.000041663203,0.00003575549,0.0000034826335],"category_scores_gemma":[0.000014934983,0.000089379806,0.000017876717,0.00014871055,0.000018592114,0.00015014506,0.000020875335,0.00003287391,1.4314433e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006559569,0.000020811696,0.0046556434,0.00024538118,0.00020348911,0.0000022502209,0.00015400178,0.93832844,0.014699346,0.033241566,0.003925472,0.0044580037],"study_design_scores_gemma":[0.002180459,0.00028272954,0.03728951,0.0009776643,0.00015182231,0.0000029348344,0.0009812078,0.8660504,0.06552455,0.0018914181,0.02416739,0.0004998991],"about_ca_topic_score_codex":0.000059641836,"about_ca_topic_score_gemma":0.00008664573,"teacher_disagreement_score":0.28774697,"about_ca_system_score_codex":0.000030604075,"about_ca_system_score_gemma":0.000010612589,"threshold_uncertainty_score":0.3644803},"labels":[],"label_agreement":null},{"id":"W4407919307","doi":"10.1016/j.procs.2025.01.335","title":"Innovative Swing Mechanism for Sustainable Energy Generation: Design, Performance, and IoT Integration","year":2025,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"NSCAD University","funders":"","keywords":"Computer science; Swing; Mechanism (biology); Internet of Things; Energy (signal processing); Mechanism design; Sustainable energy; Embedded system; Computer architecture; Industrial engineering; Renewable energy; Electrical engineering; Mechanical engineering","score_opus":0.011873954586898883,"score_gpt":0.2067400369826292,"score_spread":0.1948660823957303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407919307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025489533,0.00003132345,0.97254086,0.000083551495,0.00062267797,0.00019641127,1.4868526e-7,0.00014527164,0.00089024665],"genre_scores_gemma":[0.88095576,0.000019552632,0.11811736,0.00029287502,0.00018955441,0.00015626261,0.0000021834835,0.000007782557,0.00025865945],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992104,0.000004566025,0.00014206143,0.0002508853,0.00012936801,0.00026268218],"domain_scores_gemma":[0.99935853,0.000027601347,0.000019688316,0.00011625316,0.00044700882,0.00003089293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034405,0.000110166686,0.00008702121,0.00032716335,0.0002478014,0.00019966238,0.0001945053,0.000026467776,7.5467995e-7],"category_scores_gemma":[0.000032978507,0.00010711943,0.000008797427,0.0012312923,0.00005536927,0.00045206732,0.00012235285,0.00004281868,4.7674226e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004760081,0.000011256613,0.000052817,0.00015128887,0.00001759778,0.0000012189043,0.00036295078,0.28467926,0.009765226,0.6278535,0.0042482866,0.07285181],"study_design_scores_gemma":[0.00012690612,0.0000425722,0.00014376352,0.00001947215,0.000003421525,9.87069e-7,0.000025896097,0.88796645,0.108190805,0.0022536903,0.0011249301,0.00010107433],"about_ca_topic_score_codex":0.0000037433829,"about_ca_topic_score_gemma":0.0000020090934,"teacher_disagreement_score":0.85546625,"about_ca_system_score_codex":0.00012032566,"about_ca_system_score_gemma":0.00009052319,"threshold_uncertainty_score":0.43682033},"labels":[],"label_agreement":null},{"id":"W4407920272","doi":"10.1007/978-3-031-80817-3_5","title":"Machine Learning Algorithms for Energy Consumption Prediction in Smart Homes: A Comparative Study","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes on data engineering and communications technologies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Energy consumption; Energy (signal processing); Algorithm; Machine learning; Artificial intelligence; Engineering; Mathematics; Statistics; Electrical engineering","score_opus":0.055684494199324405,"score_gpt":0.2701506056157278,"score_spread":0.21446611141640337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407920272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001314384,0.27777994,0.6384649,0.002607862,0.0025904453,0.005803567,0.0058515724,0.038252246,0.027335018],"genre_scores_gemma":[0.94285667,0.033159867,0.013623918,0.000015300311,0.00008755607,0.0009781171,0.0069625517,0.00025192086,0.0020641212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988923,0.000008962215,0.00033288743,0.0004383236,0.00012654558,0.00020096022],"domain_scores_gemma":[0.9974212,0.00038885788,0.000048912396,0.0020956951,0.000025003657,0.000020301675],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015898285,0.00042102663,0.00040587582,0.00072499074,0.000096595504,0.000087544766,0.0010146354,0.00031288917,0.0000044704925],"category_scores_gemma":[0.000067168374,0.0004131657,0.000038851173,0.00012922444,0.00007873278,0.00009573069,0.0008651806,0.00096429593,0.000008391716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000178431,0.0000911288,0.00012391883,0.0005268795,0.00080770015,0.000007990042,0.00033330751,0.874109,0.000053037656,0.045092233,0.0006233157,0.07821365],"study_design_scores_gemma":[0.000247959,0.00016448142,0.000041914423,0.00039056686,0.00012336163,0.000004133039,0.000073328076,0.81144524,0.00006164492,0.0017366868,0.18535587,0.0003548112],"about_ca_topic_score_codex":0.000023693156,"about_ca_topic_score_gemma":0.00029509267,"teacher_disagreement_score":0.94154227,"about_ca_system_score_codex":0.000139541,"about_ca_system_score_gemma":0.000006825156,"threshold_uncertainty_score":0.99983203},"labels":[],"label_agreement":null},{"id":"W4408024161","doi":"10.1049/icp.2024.4704","title":"Data-driven power demand disaggregation to the substation level","year":2025,"lang":"en","type":"article","venue":"IET conference proceedings.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Power (physics); Power demand; Environmental science; Power consumption; Physics","score_opus":0.04362958855429583,"score_gpt":0.2615304221945298,"score_spread":0.217900833640234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408024161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33968702,0.000267629,0.5494365,0.007545797,0.0025912276,0.0011561487,0.00012075918,0.0010211574,0.09817379],"genre_scores_gemma":[0.997121,0.0000515261,0.001676868,0.00025107083,0.00007037414,0.000070679744,0.000046644618,0.000014300923,0.0006975468],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920315,0.0000040055825,0.0001743243,0.0002460211,0.00017410147,0.0001983752],"domain_scores_gemma":[0.99953943,0.000017410233,0.000026290036,0.00024783335,0.00012789927,0.000041118434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001841306,0.00013326363,0.00010339259,0.00009277735,0.000086379674,0.00019377012,0.0005499644,0.00004306993,0.00004571165],"category_scores_gemma":[0.000069571644,0.00010814428,0.00001595447,0.0003581629,0.000021855545,0.00034782232,0.00017383082,0.000103288614,0.00007672012],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046886315,0.00006810074,0.011538828,0.00035579747,0.00038539636,0.0000030234648,0.006774368,0.07117778,0.0052026603,0.19898993,0.64033425,0.06512296],"study_design_scores_gemma":[0.00038488553,0.00003341951,0.06882202,0.00021851085,0.000073443014,0.000001401394,0.001346738,0.6571395,0.002991611,0.0015040418,0.2670809,0.00040355395],"about_ca_topic_score_codex":0.000011652288,"about_ca_topic_score_gemma":0.000098283876,"teacher_disagreement_score":0.657434,"about_ca_system_score_codex":0.000060463724,"about_ca_system_score_gemma":0.000019846384,"threshold_uncertainty_score":0.44099957},"labels":[],"label_agreement":null},{"id":"W4408057291","doi":"10.1016/j.apenergy.2025.125562","title":"Maximizing shared benefits in renewable energy communities: A Bilevel optimization model","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Commission for Environmental Cooperation","keywords":"Bilevel optimization; Renewable energy; Environmental economics; Computer science; Business; Environmental science; Mathematical optimization; Economics; Engineering; Optimization problem; Mathematics","score_opus":0.014594501161091986,"score_gpt":0.189697428336329,"score_spread":0.175102927175237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408057291","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00078888785,0.00029535432,0.81056416,0.000040394963,0.0002388559,0.000058997568,0.00000816484,0.00048302388,0.18752214],"genre_scores_gemma":[0.97353107,0.00085139216,0.022189982,0.00064023293,0.000056563884,0.0004918964,0.00025019323,0.0000884512,0.0019002159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875534,0.00001861247,0.00038495677,0.00023869859,0.00016688736,0.0004354937],"domain_scores_gemma":[0.9992539,0.000056237608,0.000034860917,0.00056940684,0.000028973342,0.000056605128],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010165361,0.00028461864,0.0002873835,0.0005406162,0.00009373421,0.00007026916,0.00040215213,0.00014956291,0.00005860177],"category_scores_gemma":[0.000003919438,0.00034206166,0.000048050468,0.0007368604,0.000026188905,0.00014221422,0.00021144925,0.00010748377,0.000002705643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011787586,0.00003456904,0.000014399407,0.00003091924,0.00004983503,0.0000013271724,0.00010905252,0.91024125,0.00014780922,0.08261791,0.004437129,0.0023039915],"study_design_scores_gemma":[0.0005923955,0.000005387086,0.000026485764,0.00007354602,0.000015532669,3.6523852e-7,0.0001539256,0.9836163,0.001701681,0.0028139905,0.010694509,0.00030586682],"about_ca_topic_score_codex":0.0034520312,"about_ca_topic_score_gemma":0.0036386515,"teacher_disagreement_score":0.9727422,"about_ca_system_score_codex":0.00025425016,"about_ca_system_score_gemma":0.00003132538,"threshold_uncertainty_score":0.99990314},"labels":[],"label_agreement":null},{"id":"W4408281626","doi":"10.1109/iecon55916.2024.10905430","title":"Temporally Chained Equations: An Interpretable Missing Data Imputation Approach for Smart Meters with Low Data Requirements","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Imputation (statistics); Missing data; Computer science; Data mining; Data modeling; Database; Machine learning","score_opus":0.08097792442477686,"score_gpt":0.30022079558931414,"score_spread":0.21924287116453728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408281626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00048546115,0.00012104143,0.9943465,0.00016123615,0.00051222974,0.0004980673,0.000111158704,0.0008066974,0.0029576144],"genre_scores_gemma":[0.58901346,0.0000092691325,0.3946613,0.00010379803,0.00019711445,0.00011042528,0.015109903,0.0001097713,0.00068493554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862677,0.000022183405,0.00027388084,0.00059536856,0.00022132062,0.00026049063],"domain_scores_gemma":[0.99829555,0.000064340216,0.000024252578,0.0015149867,0.00002854767,0.00007232604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063916366,0.00018893045,0.0001468303,0.00016448695,0.00006656036,0.00034147073,0.00081316003,0.00003844871,0.000024751587],"category_scores_gemma":[0.000045932826,0.0001470121,0.000016505091,0.00026627444,0.00001850355,0.0022142362,0.0003101599,0.00006858218,0.0000072614025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052799136,0.00010695408,0.00012112383,0.0013399537,0.0009834692,0.000009850757,0.00037587085,0.91255695,0.0014495009,0.0024237428,0.032712396,0.047867417],"study_design_scores_gemma":[0.00025358042,0.00005155024,0.000029820505,0.00009445621,0.00009546765,0.0000012366912,0.00014620846,0.9924882,0.00017050921,0.00007757635,0.006371249,0.00022012326],"about_ca_topic_score_codex":0.0000912693,"about_ca_topic_score_gemma":0.00006115054,"teacher_disagreement_score":0.5996852,"about_ca_system_score_codex":0.000089816065,"about_ca_system_score_gemma":0.0000379678,"threshold_uncertainty_score":0.599498},"labels":[],"label_agreement":null},{"id":"W4408343532","doi":"10.2139/ssrn.5101465","title":"Towards Sustainable Energy Use: Reinforcement Learning for Demand Response in Commercial Buildings","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; HEC Montréal","funders":"","keywords":"Reinforcement; Demand response; Reinforcement learning; Sustainable energy; Energy (signal processing); Energy demand; Architectural engineering; Environmental economics; Business; Natural resource economics; Computer science; Economics; Engineering; Artificial intelligence; Renewable energy; Electricity; Structural engineering","score_opus":0.007915999871737868,"score_gpt":0.23434786321756707,"score_spread":0.2264318633458292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408343532","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07216663,0.003162956,0.92043,0.00058692234,0.0012376276,0.00051000045,0.000002777762,0.00023913023,0.0016639685],"genre_scores_gemma":[0.96801007,0.009604333,0.00048111862,0.00010857063,0.00052146584,0.00025945198,0.000045948025,0.00010068908,0.020868355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99488264,0.00017731113,0.0007313793,0.0003919147,0.0003550706,0.003461667],"domain_scores_gemma":[0.9990114,0.00019769547,0.00017793861,0.00034995127,0.00016334107,0.00009969085],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.004055616,0.0004934927,0.00055789534,0.00094989967,0.0002354575,0.0002711459,0.0006365791,0.00035328962,0.00001443709],"category_scores_gemma":[0.00034235299,0.0005592186,0.00026955706,0.0003187445,0.000027723763,0.00023202976,0.0006024997,0.003768761,0.0000012010222],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007058934,0.00001791344,0.00015136927,0.00018278192,0.00040657644,0.000017335622,0.00014942967,0.91110945,0.000028056014,0.08241975,0.0011640299,0.0036474145],"study_design_scores_gemma":[0.004389797,0.00089794246,0.0013040577,0.00077773095,0.00035082424,0.000073861665,0.002130848,0.35104588,0.00078770093,0.10323605,0.53317904,0.0018262737],"about_ca_topic_score_codex":0.00065503415,"about_ca_topic_score_gemma":0.00065527484,"teacher_disagreement_score":0.9199489,"about_ca_system_score_codex":0.00778664,"about_ca_system_score_gemma":0.0023603074,"threshold_uncertainty_score":0.99968594},"labels":[],"label_agreement":null},{"id":"W4408358080","doi":"10.1109/tste.2025.3550563","title":"Energy Management of Multi-Energy Communities: A Hierarchical MIQP-Constrained Deep Reinforcement Learning Approach","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reinforcement learning; Energy management; Computer science; Energy (signal processing); Artificial intelligence","score_opus":0.008362335759426905,"score_gpt":0.2064536769525201,"score_spread":0.19809134119309318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408358080","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041190695,0.00026537586,0.92188823,0.000042321695,0.00047184975,0.00013336437,0.0000026216987,0.0005276984,0.076256655],"genre_scores_gemma":[0.9546174,0.0011940799,0.002915608,0.00016039844,0.00003371501,0.0009359643,0.000040716146,0.000090755544,0.040011358],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99736345,0.00016412472,0.0007433813,0.0003911441,0.00042480972,0.0009130786],"domain_scores_gemma":[0.9986332,0.00015441104,0.00008595497,0.0008197344,0.0001522465,0.00015443724],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024455987,0.0005282567,0.0005356236,0.0011107344,0.0004293322,0.000074732445,0.000589401,0.00021190527,0.00015481716],"category_scores_gemma":[0.0000025435995,0.0005948948,0.00027484496,0.001216611,0.00020425487,0.00021645358,0.000028826209,0.0003951808,0.0000019740837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007506545,0.00028162356,0.0000017305431,0.0005004643,0.00088916987,0.00003884187,0.00020422722,0.83940786,0.000052271444,0.13897943,0.00024880675,0.01932053],"study_design_scores_gemma":[0.0015210072,0.0001100287,0.0000086955315,0.00014564078,0.00019616046,0.00000503038,0.008021673,0.91999394,0.008598288,0.00038155616,0.060498323,0.0005196569],"about_ca_topic_score_codex":0.002055428,"about_ca_topic_score_gemma":0.00017807586,"teacher_disagreement_score":0.9542055,"about_ca_system_score_codex":0.0005803644,"about_ca_system_score_gemma":0.00006427984,"threshold_uncertainty_score":0.99965024},"labels":[],"label_agreement":null},{"id":"W4409102160","doi":"10.1109/access.2025.3556955","title":"Customizable Preference Models for Prosumers in Peer-to-Peer Energy Trading","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Peer-to-peer; Computer science; Preference; Distributed computing; Microeconomics; Economics","score_opus":0.04457695918830155,"score_gpt":0.2782086797052685,"score_spread":0.23363172051696698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409102160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07175816,0.000098377655,0.86530787,0.0006495808,0.002507323,0.0005440845,0.000012834304,0.00040273488,0.058719035],"genre_scores_gemma":[0.9897541,0.00001656851,0.001426761,0.00025084804,0.00008446859,0.00071585824,0.000010098583,0.000037343205,0.0077039716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988734,0.000011370032,0.00023852455,0.00027885227,0.00021508137,0.0003827719],"domain_scores_gemma":[0.9995078,0.000054004217,0.000016817079,0.00028343598,0.00007953779,0.00005839735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020975321,0.0001724785,0.00020077197,0.00035798046,0.0000420612,0.00013181775,0.00053825794,0.00007118586,0.00001347671],"category_scores_gemma":[0.000028751214,0.00018807252,0.000043912376,0.0005480678,0.000009903194,0.00047738812,0.000067055975,0.000084587766,0.0000036500223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016803486,0.000016450356,0.00021441234,0.000093210496,0.000035876626,0.0000016089031,0.00008988996,0.9368587,0.00029695305,0.0046517393,0.05347872,0.0042456263],"study_design_scores_gemma":[0.0005281282,0.000009751548,0.0002671852,0.0000798929,0.000017215196,1.8317598e-7,0.000021607048,0.9152953,0.016341235,0.0038827218,0.06332324,0.00023356405],"about_ca_topic_score_codex":0.00023663238,"about_ca_topic_score_gemma":0.00033372635,"teacher_disagreement_score":0.9179959,"about_ca_system_score_codex":0.00018758781,"about_ca_system_score_gemma":0.000023765322,"threshold_uncertainty_score":0.7669375},"labels":[],"label_agreement":null},{"id":"W4409254736","doi":"10.1007/978-3-031-87364-5_20","title":"Efficient and Rapid Optimal Chiller Loading Using a Simplified Two-Stage Algorithm","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario; Toronto Metropolitan University","funders":"","keywords":"Chiller; Stage (stratigraphy); Chiller boiler system; Algorithm; Computer science; Mathematical optimization; Mathematics; Water chiller; Engineering; Physics; Thermodynamics; Mechanical engineering; Geology","score_opus":0.008392546974703336,"score_gpt":0.2031210189139747,"score_spread":0.19472847193927134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409254736","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00096544984,0.005579748,0.9543531,0.000021177008,0.0018512032,0.0004713217,0.00004281607,0.00075275335,0.035962418],"genre_scores_gemma":[0.82013226,0.0014441747,0.16459735,0.0003509722,0.0034031144,0.00016198313,0.00021688682,0.0017137822,0.007979498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978687,0.000008573128,0.0005234703,0.00063161383,0.00030504345,0.0006625869],"domain_scores_gemma":[0.99903226,0.00024283242,0.0000626908,0.00051092665,0.000029216495,0.00012209127],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019235123,0.00085313874,0.000720874,0.0009493372,0.00006420865,0.00009268111,0.0002547837,0.00043701654,0.00015168331],"category_scores_gemma":[0.000059778256,0.0009839884,0.00015121175,0.00019981382,0.00003639588,0.000045858716,0.00025767373,0.0010076297,0.000005851076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003641477,0.000005222318,0.0000026382243,0.00040976802,0.00019691266,0.000108271626,0.00010645307,0.98443484,0.0004381441,0.0011682003,0.000028969715,0.013096916],"study_design_scores_gemma":[0.0005130843,0.000014554302,0.000013596352,0.00089605036,0.000084850966,0.000015900434,0.0000018375721,0.98075736,0.00050394284,0.000074603406,0.01626681,0.00085742126],"about_ca_topic_score_codex":0.000023120347,"about_ca_topic_score_gemma":0.000053936947,"teacher_disagreement_score":0.8191668,"about_ca_system_score_codex":0.0005033325,"about_ca_system_score_gemma":0.000027395472,"threshold_uncertainty_score":0.9992611},"labels":[],"label_agreement":null},{"id":"W4409259597","doi":"10.1016/j.enbuild.2025.115721","title":"Towards sustainable energy use: Reinforcement learning for demand response in commercial buildings","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brain Canada Foundation; Mila - Quebec Artificial Intelligence Institute; Canadian Institute for Advanced Research; HEC Montréal","funders":"Mitacs","keywords":"Reinforcement; Demand response; Reinforcement learning; Energy (signal processing); Energy demand; Architectural engineering; Sustainable energy; Engineering; Environmental economics; Computer science; Economics; Structural engineering; Renewable energy; Artificial intelligence; Electricity","score_opus":0.0065952216827555145,"score_gpt":0.218327315090431,"score_spread":0.2117320934076755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409259597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40219253,0.00088953844,0.59078133,0.0006423207,0.00050331844,0.00016447967,0.0000011492613,0.00033952345,0.0044858344],"genre_scores_gemma":[0.98455584,0.0005175189,0.0011646888,0.0005100318,0.00009821055,0.00018591281,0.000018284556,0.00004285861,0.012906659],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851227,0.00005103893,0.00035561871,0.00033040895,0.00014623879,0.0006044216],"domain_scores_gemma":[0.99938303,0.00023939005,0.000042733936,0.00019406958,0.00006079765,0.00007999801],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006092347,0.00027445357,0.0003010525,0.00053681893,0.00021929412,0.00014876435,0.0001903245,0.00015172015,0.000014796989],"category_scores_gemma":[0.00018256031,0.00030029268,0.00007154438,0.00048344585,0.000050972583,0.00033465904,0.00021015761,0.0001342637,3.0114464e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047550863,0.000014808577,0.0005175715,0.00008388884,0.00007084066,0.000016296794,0.00012543061,0.72621715,0.0015548617,0.2595193,0.0067093684,0.004694943],"study_design_scores_gemma":[0.001204183,0.000118163036,0.0021974402,0.00009039893,0.000031677035,0.0000021131918,0.00017033122,0.067271225,0.014912565,0.0013808788,0.9122761,0.00034494954],"about_ca_topic_score_codex":0.0008948523,"about_ca_topic_score_gemma":0.0000773243,"teacher_disagreement_score":0.9055667,"about_ca_system_score_codex":0.00026204734,"about_ca_system_score_gemma":0.00003858841,"threshold_uncertainty_score":0.9999449},"labels":[],"label_agreement":null},{"id":"W4409382064","doi":"10.1016/j.eneco.2025.108439","title":"The new merit order: The viability of energy-only electricity markets with only intermittent renewable energy sources and grid-scale storage","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Brandenburgische Technische Universität Cottbus-Senftenberg; Bundesministerium für Bildung, Wissenschaft, Forschung und Technologie; Bundesministerium für Bildung und Forschung","keywords":"Renewable energy; Environmental economics; Electricity; Scale (ratio); Grid; Order (exchange); Energy storage; Intermittent energy source; Economics; Electricity system; Natural resource economics; Distributed generation; Environmental science; Microeconomics; Business; Electricity generation; Engineering; Power (physics); Electrical engineering; Physics; Finance; Mathematics","score_opus":0.0023669905642531514,"score_gpt":0.15548266768341357,"score_spread":0.1531156771191604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409382064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8481444,0.0044484558,0.08887733,0.0021270763,0.002188367,0.00019884916,0.0000239655,0.0003715867,0.053619944],"genre_scores_gemma":[0.9837747,0.0037610624,0.00039125374,0.00043545564,0.00034056956,0.00005496581,0.000017762268,0.000068590765,0.011155606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99842155,0.00009879068,0.0005015672,0.00041712445,0.000107963904,0.00045303156],"domain_scores_gemma":[0.9985426,0.00032167858,0.00013623912,0.00083904876,0.00005314206,0.00010729222],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033739625,0.00034855853,0.00038866815,0.00012842106,0.00023953173,0.00012881854,0.0006007831,0.00010762695,0.000025525422],"category_scores_gemma":[0.000025310346,0.0002464031,0.00009593753,0.00034953203,0.00019455374,0.00014977,0.00026020667,0.00013049653,4.141589e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028115915,0.00010050284,0.010186012,0.000069530346,0.0010653024,0.0000041432377,0.00018799561,0.8253329,0.00014693328,0.03879673,0.044327248,0.07950158],"study_design_scores_gemma":[0.0005396971,0.000074574746,0.00455909,0.0000301792,0.000083802464,0.000010724599,0.00015677452,0.16393024,0.006208333,0.0019987703,0.8220496,0.00035817066],"about_ca_topic_score_codex":0.0055486923,"about_ca_topic_score_gemma":0.045541663,"teacher_disagreement_score":0.7777224,"about_ca_system_score_codex":0.00023160415,"about_ca_system_score_gemma":0.00017326405,"threshold_uncertainty_score":0.9999988},"labels":[],"label_agreement":null},{"id":"W4409387610","doi":"10.1016/j.enbuild.2025.115738","title":"Demand response based battery energy storage systems design and operation optimization","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Battery (electricity); Energy storage; Battery storage; Automotive engineering; Energy (signal processing); Demand response; Computer science; Environmental science; Engineering; Reliability engineering; Electrical engineering; Power (physics); Electricity","score_opus":0.005043817147784627,"score_gpt":0.1785840767786421,"score_spread":0.17354025963085748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409387610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025332747,0.0014416663,0.9719715,0.00016686512,0.00044747026,0.00005181873,9.866696e-7,0.00017958404,0.00040734492],"genre_scores_gemma":[0.990276,0.0003917696,0.007823111,0.0003475375,0.000069416026,0.00006466979,0.000013361924,0.000025372443,0.0009887893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992425,0.000119516844,0.00017257752,0.00021913536,0.000087463864,0.00015880576],"domain_scores_gemma":[0.9996208,0.00014416807,0.000021372784,0.00014172477,0.000022296877,0.00004963569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034020285,0.00015738542,0.00014443442,0.0002343621,0.00012298331,0.0001378104,0.000065409884,0.00008984437,0.000010866048],"category_scores_gemma":[0.000019921345,0.0001609998,0.00001591291,0.00016806481,0.000027392434,0.0001772716,0.0000370242,0.000038823553,2.7330017e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080040525,0.000006974089,0.00003559607,0.000031416264,0.000035920115,0.000005661261,0.000019103492,0.9828035,0.0032556246,0.0095020635,0.0037443873,0.00047968968],"study_design_scores_gemma":[0.00037972385,0.000028804558,0.0001584549,0.00006700272,0.000024268347,0.0000024933966,0.000015147191,0.951118,0.006790499,0.000029418497,0.041227337,0.00015883637],"about_ca_topic_score_codex":0.000052209798,"about_ca_topic_score_gemma":0.000003988798,"teacher_disagreement_score":0.96494323,"about_ca_system_score_codex":0.000057669764,"about_ca_system_score_gemma":0.000014426755,"threshold_uncertainty_score":0.6565381},"labels":[],"label_agreement":null},{"id":"W4409553296","doi":"10.1080/29931282.2025.2490525","title":"Local energy monitoring to support smart energy management and decarbonized town development","year":2025,"lang":"en","type":"article","venue":"Sustainable communities.","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Council for Science, Technology and Innovation; Ministry of Education, Culture, Sports, Science and Technology; Swine Innovation Porc","keywords":"Energy (signal processing); Business; Energy management; Environmental planning; Environmental resource management; Geography; Environmental science; Physics","score_opus":0.007619600065118878,"score_gpt":0.20661879509182007,"score_spread":0.1989991950267012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409553296","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07069046,0.0030595667,0.4455205,0.00033496227,0.001955685,0.00053323613,0.000002732963,0.0016236084,0.47627926],"genre_scores_gemma":[0.9440041,0.00048282338,0.0026137226,0.00037815186,0.000043276126,0.00048936094,0.000029465335,0.000060193695,0.05189886],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982449,0.000059546834,0.00039362191,0.00021944549,0.0002504999,0.0008319833],"domain_scores_gemma":[0.9989035,0.00007023497,0.000023353541,0.00072993134,0.00010784651,0.00016511724],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028206382,0.0003573174,0.000317222,0.00069581426,0.0003708769,0.0001662798,0.0005417396,0.000089483336,0.000067784466],"category_scores_gemma":[0.000005885169,0.00041977258,0.00004496553,0.00061347627,0.000072573086,0.00016782724,0.0013074902,0.00015730114,0.000004492901],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001415838,0.00019836998,0.0039118966,0.001901613,0.0017395668,0.0006240921,0.004689878,0.26588726,0.00003971213,0.33778962,0.05960825,0.32346815],"study_design_scores_gemma":[0.0006980224,0.000041007544,0.0016977937,0.0001241731,0.000045388897,0.0000027880221,0.02000093,0.0040025013,0.0032809007,0.0008030662,0.96882683,0.00047658282],"about_ca_topic_score_codex":0.0017871495,"about_ca_topic_score_gemma":0.0003638535,"teacher_disagreement_score":0.9092186,"about_ca_system_score_codex":0.00089778623,"about_ca_system_score_gemma":0.00007148942,"threshold_uncertainty_score":0.9998254},"labels":[],"label_agreement":null},{"id":"W4409695000","doi":"10.1016/j.jup.2025.101942","title":"Transforming marginal-cost pricing: A blockchain approach to fundamental energy system dynamics","year":2025,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute for Clinical Evaluative Sciences","funders":"","keywords":"Blockchain; System dynamics; Economics; Marginal cost; Dynamics (music); Energy (signal processing); Mathematical economics; Microeconomics; Computer science; Mathematics; Physics; Computer security; Statistics","score_opus":0.007866422693206497,"score_gpt":0.21289360427835533,"score_spread":0.20502718158514882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409695000","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06039962,0.00022239903,0.21975929,0.0004261789,0.0009091902,0.00055546226,0.00007855671,0.0012751098,0.7163742],"genre_scores_gemma":[0.98856354,0.000013635079,0.00073865004,0.00033210163,0.0003084864,0.00030696153,0.000034873232,0.000053125914,0.009648644],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99852574,0.000026772113,0.00033642087,0.00028435088,0.00020481378,0.000621914],"domain_scores_gemma":[0.9993943,0.000035993206,0.00001768192,0.0003996505,0.000021638512,0.00013073074],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013395742,0.0002949144,0.00028762856,0.00070880115,0.000121116485,0.000075447504,0.0003050522,0.00008672868,0.000007869243],"category_scores_gemma":[0.00001164585,0.0003260436,0.00010234123,0.0007413239,0.000039361636,0.00005804776,0.00010064083,0.00011513541,0.000013059711],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016505377,0.00003742466,0.000120954624,0.0007744758,0.00015601146,0.000004402244,0.0009766474,0.24991429,0.000066832356,0.7362147,0.0029351125,0.008782671],"study_design_scores_gemma":[0.00049577584,0.000027614733,0.00029079296,0.00018606984,0.00004448534,0.000012327621,0.007869865,0.79948777,0.0010702964,0.00023560054,0.18983382,0.00044560884],"about_ca_topic_score_codex":0.0016725936,"about_ca_topic_score_gemma":0.00021841326,"teacher_disagreement_score":0.9281639,"about_ca_system_score_codex":0.001676472,"about_ca_system_score_gemma":0.00005405179,"threshold_uncertainty_score":0.9999192},"labels":[],"label_agreement":null},{"id":"W4409786295","doi":"10.1016/j.esr.2025.101712","title":"Penalty mechanism in transactive energy: A mechanism design approach for day-ahead markets","year":2025,"lang":"en","type":"article","venue":"Energy Strategy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Fondation de l’UQTR; Hydro-Québec; Université du Québec à Trois-Rivières","keywords":"Mechanism (biology); Transactive memory; Mechanism design; Energy (signal processing); Computer science; Risk analysis (engineering); Economics; Business; Environmental economics; Microeconomics; Mathematics; Knowledge management","score_opus":0.03127597932638341,"score_gpt":0.24413817615946412,"score_spread":0.21286219683308072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409786295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000056676803,0.008595356,0.955476,0.000046244448,0.0005627259,0.0007115154,0.000009593803,0.00025427525,0.03428761],"genre_scores_gemma":[0.8223542,0.036415417,0.10986335,0.0014478341,0.0005274426,0.013912388,0.00032107503,0.0004103462,0.0147479335],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99716944,0.0004083046,0.0008460753,0.00067333534,0.00020400017,0.0006988275],"domain_scores_gemma":[0.9989701,0.00015160457,0.000095197574,0.00062005315,0.0000423577,0.000120680364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012917004,0.00057997485,0.0008964339,0.00041000993,0.00009470259,0.00007342427,0.0005170876,0.00024003032,0.0000777448],"category_scores_gemma":[0.000029756087,0.00055745686,0.0002850475,0.0007531005,0.000027541464,0.00022740486,0.00004187011,0.00020808744,0.0000053589706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006769712,0.00015512828,0.0000011635676,0.00054021354,0.00026902507,0.000015384037,0.00007704029,0.24393086,0.0019925572,0.6734416,0.007402666,0.07210666],"study_design_scores_gemma":[0.0017740477,0.00014237787,0.000044022927,0.00039569766,0.00021080828,0.000005998854,0.00011651276,0.6532228,0.0286164,0.060107023,0.25423554,0.0011287843],"about_ca_topic_score_codex":0.00011609075,"about_ca_topic_score_gemma":0.00017621572,"teacher_disagreement_score":0.84561265,"about_ca_system_score_codex":0.000268024,"about_ca_system_score_gemma":0.000069931215,"threshold_uncertainty_score":0.9996877},"labels":[],"label_agreement":null},{"id":"W4409905083","doi":"10.1016/j.compeleceng.2025.110356","title":"Technical assessment framework for cost-sharing agreements in transactive energy systems","year":2025,"lang":"en","type":"article","venue":"Computers & Electrical Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transactive memory; Energy (signal processing); Computer science; Risk analysis (engineering); Process management; Business; Knowledge management; Systems engineering; Engineering; Mathematics","score_opus":0.007288148101133696,"score_gpt":0.2392749380800018,"score_spread":0.2319867899788681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409905083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081787043,0.00057773956,0.99500465,0.000053243017,0.0017123502,0.00050335587,0.0000024404078,0.00065485307,0.0006734907],"genre_scores_gemma":[0.94663525,0.00008153218,0.05211394,0.000076563054,0.00016523193,0.0007997144,0.000014114006,0.00006549794,0.000048159945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982835,0.000013652139,0.00044433336,0.00040563793,0.00019897395,0.00065392145],"domain_scores_gemma":[0.99919057,0.00034440518,0.00002473308,0.00031406386,0.000028857181,0.000097367745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001734275,0.0003071069,0.0004182505,0.00056225364,0.00004249733,0.00008831759,0.00042420047,0.00018089978,0.0000023344403],"category_scores_gemma":[0.000029118843,0.0003594441,0.00011160188,0.0009779783,0.000009832328,0.00010670009,0.000070538954,0.00039904902,0.0000012081539],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007814087,0.000040603612,0.000091493916,0.0001222419,0.00009786702,0.000009344953,0.000012739936,0.92017305,0.00050217623,0.068183444,0.0004496493,0.010309549],"study_design_scores_gemma":[0.0005626554,0.000042714182,0.0012654876,0.0002813503,0.000026858801,0.0000020104974,0.0000045401307,0.9885437,0.0004714917,0.0005416697,0.007943495,0.00031404375],"about_ca_topic_score_codex":0.000019675155,"about_ca_topic_score_gemma":0.0000036172419,"teacher_disagreement_score":0.94581735,"about_ca_system_score_codex":0.0009956468,"about_ca_system_score_gemma":0.000022607566,"threshold_uncertainty_score":0.99988574},"labels":[],"label_agreement":null},{"id":"W4410080006","doi":"10.1016/j.enconman.2025.119868","title":"Optimized energy management in Grid-Connected microgrids leveraging K-means clustering algorithm and Artificial Neural network models","year":2025,"lang":"en","type":"article","venue":"Energy Conversion and Management","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada's Ocean Supercluster; National Research Foundation","keywords":"Artificial neural network; Cluster analysis; Computer science; Grid; Energy (signal processing); Algorithm; Artificial intelligence; Mathematics","score_opus":0.008066157190589033,"score_gpt":0.1877618655414545,"score_spread":0.17969570835086546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410080006","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007166577,0.0021961,0.9475095,0.0007060192,0.0048452877,0.00044162362,0.0000043266155,0.00071832584,0.03641223],"genre_scores_gemma":[0.82890564,0.04785594,0.10179885,0.0072711515,0.001193474,0.00082713866,0.00030168108,0.0003071463,0.011538992],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804646,0.00006925158,0.0004571096,0.0005995534,0.0002137354,0.0006139053],"domain_scores_gemma":[0.99943745,0.000037906666,0.00004500663,0.00034494727,0.000018858684,0.000115842195],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002268973,0.00040056527,0.00036531128,0.0006073341,0.00017383951,0.00013956908,0.00022563552,0.00009396199,0.000028655435],"category_scores_gemma":[0.0000011008082,0.0004546271,0.000069138834,0.00055736426,0.000055705757,0.00022642183,0.00060883065,0.00012254,0.0000016718474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004557717,0.00003112631,0.00001502668,0.00016221209,0.0003092186,0.00012629294,0.000057832218,0.8433066,0.000014481178,0.025106445,0.008466647,0.12235855],"study_design_scores_gemma":[0.001688749,0.000016363496,0.00033420342,0.00013541245,0.00010153441,0.0000026358305,0.0003194221,0.9045687,0.00014288064,0.000789833,0.09150989,0.00039041185],"about_ca_topic_score_codex":0.00022591875,"about_ca_topic_score_gemma":0.00008613386,"teacher_disagreement_score":0.84571064,"about_ca_system_score_codex":0.00016858801,"about_ca_system_score_gemma":0.0000041838052,"threshold_uncertainty_score":0.99979055},"labels":[],"label_agreement":null},{"id":"W4410164309","doi":"10.2139/ssrn.5244865","title":"Risk-Averse Lot-Sizing Model for Microgrids Under Energy Degradation","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Dalhousie University","funders":"","keywords":"Sizing; Degradation (telecommunications); Energy (signal processing); Economics; Computer science; Microeconomics; Environmental economics; Mathematical optimization; Business; Biochemical engineering; Engineering; Mathematics; Chemistry; Statistics; Telecommunications","score_opus":0.010081363932103692,"score_gpt":0.21990430087652943,"score_spread":0.20982293694442575,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410164309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068828883,0.0057264017,0.9836925,0.00015914656,0.0018837594,0.00021420694,0.00004928851,0.00029826842,0.0010935158],"genre_scores_gemma":[0.8948975,0.071838625,0.012665011,0.00025579697,0.0021256397,0.0002879856,0.0004011137,0.0002957367,0.017232582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99651647,0.000057606783,0.00053815934,0.00040766993,0.00027782153,0.0022022738],"domain_scores_gemma":[0.99906516,0.00006302447,0.00021826109,0.0004462219,0.000117387135,0.000089962625],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0010172726,0.00047448964,0.00039461022,0.0004448613,0.00021401094,0.0001436919,0.00058127695,0.0003396731,0.0000073323804],"category_scores_gemma":[0.000028691044,0.0005228086,0.0003804401,0.00015564471,0.000022280912,0.00013625274,0.00025115188,0.0026734015,0.0000046223945],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021406137,0.000023416142,0.000021720409,0.00006968957,0.0009499991,7.235898e-7,0.00004161121,0.9082584,0.00007788167,0.07156176,0.0015512733,0.01742216],"study_design_scores_gemma":[0.00054102857,0.000030478528,0.0000139084805,0.00008428695,0.00031572417,0.000014380783,0.00019476375,0.80667055,0.00031165773,0.18598892,0.0054135765,0.00042072538],"about_ca_topic_score_codex":0.00019091637,"about_ca_topic_score_gemma":0.0022306265,"teacher_disagreement_score":0.9710275,"about_ca_system_score_codex":0.003838344,"about_ca_system_score_gemma":0.001392764,"threshold_uncertainty_score":0.99998575},"labels":[],"label_agreement":null},{"id":"W4410191116","doi":"10.18280/mmep.120426","title":"Congestion and Workflow Management in Energy Systems Using Adaptive Generation Rescheduling Techniques","year":2025,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Computer science; Workflow management system; Distributed computing; Systems engineering; Database; Engineering","score_opus":0.025932977200207583,"score_gpt":0.20663239179649226,"score_spread":0.1806994145962847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410191116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029624049,0.0017215392,0.967129,0.000015223706,0.00015697375,0.00020371446,4.6112027e-7,0.00032558123,0.0008234574],"genre_scores_gemma":[0.85972476,0.0007439377,0.13925764,0.0000068262107,0.000049492483,0.00012750397,0.000002742228,0.00003237649,0.00005474614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913466,0.0000126101295,0.00030914243,0.00021728272,0.00009900665,0.0002272855],"domain_scores_gemma":[0.9997521,0.000038123977,0.000016667887,0.00013356256,0.000015305854,0.000044264612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002464839,0.00018852089,0.00021674746,0.0002857136,0.00004038627,0.00008937402,0.00005343932,0.000092102564,6.115244e-7],"category_scores_gemma":[0.0000048320126,0.00019881847,0.000017013035,0.00020305239,0.000015423027,0.00009958541,0.000049331513,0.000115623916,3.7092857e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017091699,0.000009670904,0.0000044120884,0.00064148346,0.000045122815,0.0000029906867,0.000060905728,0.9295347,0.00037231742,0.06739338,0.0000074633385,0.0019258731],"study_design_scores_gemma":[0.00012839059,0.000008484223,0.000004605513,0.0010136127,0.00003121438,0.0000034350232,0.000025062083,0.994731,0.00028334974,0.0033581606,0.00023133661,0.00018136179],"about_ca_topic_score_codex":0.000022219412,"about_ca_topic_score_gemma":0.000001491161,"teacher_disagreement_score":0.8301007,"about_ca_system_score_codex":0.00009006696,"about_ca_system_score_gemma":0.0000025177123,"threshold_uncertainty_score":0.8107582},"labels":[],"label_agreement":null},{"id":"W4410246268","doi":"10.1016/j.renene.2025.123390","title":"Clustering-driven design and predictive control of hybrid PV-battery storage systems for demand response in energy communities","year":2025,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Collège Shawinigan; University of Waterloo; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Natural Resources Canada; Hydro-Québec","keywords":"Demand response; Cluster analysis; Battery (electricity); Battery storage; Model predictive control; Energy storage; Control (management); Computer science; Photovoltaic system; Automotive engineering; Environmental science; Engineering; Electrical engineering; Machine learning; Artificial intelligence; Power (physics); Electricity","score_opus":0.008960508546860778,"score_gpt":0.19488571828762424,"score_spread":0.18592520974076346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410246268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0131957,0.0031601742,0.98218864,0.000030857016,0.00054847286,0.00020182822,0.000040678657,0.00011404599,0.0005195746],"genre_scores_gemma":[0.9971669,0.00083266554,0.0004907569,0.00007566214,0.00005525672,0.00045803725,0.00002541887,0.000045211054,0.0008500919],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986165,0.00033687826,0.00040980327,0.00018730218,0.00012530254,0.000324183],"domain_scores_gemma":[0.9985769,0.00086826173,0.000065818094,0.00037996587,0.00005509919,0.00005398083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004910129,0.00023573221,0.00045117483,0.00045946753,0.00006742155,0.000042159623,0.00022326062,0.00007487958,0.0000035316593],"category_scores_gemma":[0.000031287454,0.0002587116,0.000051702613,0.00018950464,0.00006718027,0.000120938006,0.00009829242,0.000059808943,1.2174776e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008700242,0.000026725447,0.00014286472,0.00022852278,0.0002188999,0.000010836238,0.000094080526,0.99396944,0.0018836873,0.00029462372,0.002232861,0.00002746304],"study_design_scores_gemma":[0.0015514892,0.00016967236,0.0002353567,0.00031076698,0.000049910253,0.0000044935427,0.00022644803,0.9819961,0.0055489857,0.0001636349,0.009545666,0.00019746844],"about_ca_topic_score_codex":0.0015147723,"about_ca_topic_score_gemma":0.00015617293,"teacher_disagreement_score":0.9839712,"about_ca_system_score_codex":0.00018555824,"about_ca_system_score_gemma":0.00004172225,"threshold_uncertainty_score":0.9999865},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"methods","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W4410342861","doi":"10.1109/access.2025.3569761","title":"Comprehensive Review on the Control of Heat Pumps for Energy Flexibility in Distribution Networks","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Mitacs","keywords":"Flexibility (engineering); Computer science; Control (management); Energy (signal processing); Distribution (mathematics); Physics; Mathematics; Artificial intelligence","score_opus":0.025619588827059833,"score_gpt":0.28424259211763603,"score_spread":0.2586230032905762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410342861","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03315121,0.014465589,0.9459707,0.0017375342,0.001940563,0.0011032854,0.000059204212,0.00012841972,0.001443487],"genre_scores_gemma":[0.99589205,0.0024520843,0.0000053667395,0.001250785,0.0000625526,0.00027923132,0.000032216583,0.000008301415,0.000017437373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993097,0.00005218643,0.0002633704,0.00013831831,0.00007689501,0.00015952821],"domain_scores_gemma":[0.9992426,0.0003273098,0.000023415098,0.000335852,0.00005581213,0.000015013162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018744459,0.000108244196,0.00023579663,0.000032312997,0.000026937605,0.000016640435,0.00027993927,0.000040310264,0.000008638695],"category_scores_gemma":[0.000034864155,0.00008268534,0.000067240246,0.00028655693,0.00002541419,0.00006343827,0.000029017649,0.00007336021,5.393141e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023315946,0.000019732293,0.0002376297,0.0005955389,0.000046707384,4.02444e-7,0.0000017177091,0.9767143,0.00003092671,0.0045636958,0.014618717,0.0031473064],"study_design_scores_gemma":[0.0006950848,0.000024693389,0.008922556,0.0011519245,0.000057137735,1.3551248e-7,0.000004873228,0.9008352,0.0031405971,0.00087564427,0.08414795,0.00014419426],"about_ca_topic_score_codex":0.00013263365,"about_ca_topic_score_gemma":0.000056934536,"teacher_disagreement_score":0.96274084,"about_ca_system_score_codex":0.00009517517,"about_ca_system_score_gemma":0.0000069341945,"threshold_uncertainty_score":0.33718106},"labels":[],"label_agreement":null},{"id":"W4410352968","doi":"10.1016/j.isci.2025.112662","title":"Growing the power system: Expansions on transmission and distribution systems for deep electrification","year":2025,"lang":"en","type":"review","venue":"iScience","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electrification; Engineering physics; Distribution (mathematics); Environmental science; Engineering; Electrical engineering; Mathematics; Electricity","score_opus":0.016619100564993022,"score_gpt":0.25683530151050327,"score_spread":0.24021620094551024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410352968","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000018020761,0.70966005,0.2881219,0.000018761626,0.0007603987,0.00073522824,0.000017097638,0.00012654076,0.0005582344],"genre_scores_gemma":[0.002046356,0.9969388,0.000043969358,0.000005937117,0.00006424945,0.0006382312,0.00006663969,0.000018038476,0.00017778088],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99895823,0.00005471916,0.00028571085,0.00029337758,0.00018599238,0.00022196822],"domain_scores_gemma":[0.9993057,0.00025461047,0.00005435169,0.00031873566,0.000024663977,0.00004193781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004089372,0.0002019146,0.00034743818,0.00009685317,0.00025348508,0.00011251415,0.0002922214,0.000097667646,5.8080946e-7],"category_scores_gemma":[0.000037734422,0.00013001802,0.000099248886,0.00047255927,0.000028373956,0.00011002562,0.000013981541,0.00012046357,0.000004387104],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013738503,0.000008922628,9.085933e-8,0.024951905,0.000035841495,0.0000010811686,0.00005696475,0.03044659,0.000017026588,0.02735259,0.0020059906,0.9151216],"study_design_scores_gemma":[0.000037593927,0.000016674256,0.000002008179,0.00932548,0.00014005668,0.0000038220087,0.00005824126,0.044226658,0.00000961088,0.000003916147,0.94603163,0.00014433263],"about_ca_topic_score_codex":0.000008555483,"about_ca_topic_score_gemma":6.8180566e-7,"teacher_disagreement_score":0.94402564,"about_ca_system_score_codex":0.00024012604,"about_ca_system_score_gemma":0.000034362743,"threshold_uncertainty_score":0.5301981},"labels":[],"label_agreement":null},{"id":"W4410634303","doi":"10.1007/978-981-96-4914-3_2","title":"Key Application Use Cases in Microgrids","year":2025,"lang":"en","type":"book-chapter","venue":"Power systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Key (lock); Biochemical engineering; Computer science; Engineering; Computer security","score_opus":0.01093343678697574,"score_gpt":0.1909003701080431,"score_spread":0.17996693332106733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410634303","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00033487403,0.0064217206,0.006127544,0.000023528211,0.0057622953,0.000971715,0.000085391526,0.0006872482,0.9795857],"genre_scores_gemma":[0.27008992,0.00057890307,0.000115701405,0.000054787,0.0003552664,0.00036780565,0.00021547136,0.00019459586,0.7280275],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892646,0.000009297304,0.0004016346,0.00029214882,0.0001660909,0.00020436615],"domain_scores_gemma":[0.9992013,0.00008969676,0.00005512066,0.000579822,0.000031858028,0.000042212672],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000102816346,0.0003027092,0.00034770984,0.00034511506,0.000016893737,0.0000793803,0.00019270279,0.0002380379,0.000028259143],"category_scores_gemma":[0.000010620593,0.00034151177,0.00007405065,0.000056645626,0.000014596028,0.000072183015,0.00006695238,0.00019674822,0.00022679994],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017003871,0.000041007854,0.001033246,0.0025663546,0.0007602488,0.00044127257,0.00029865975,0.2088227,0.00016764473,0.39589316,0.38744572,0.0025129677],"study_design_scores_gemma":[0.00010283695,0.000007808564,0.00012966622,0.00042785058,0.000027255743,0.000010458737,0.000009404969,0.0033739284,0.000013689162,0.000026998125,0.99556655,0.00030356811],"about_ca_topic_score_codex":0.00034307232,"about_ca_topic_score_gemma":0.0001880644,"teacher_disagreement_score":0.6081208,"about_ca_system_score_codex":0.00030825852,"about_ca_system_score_gemma":0.000013396727,"threshold_uncertainty_score":0.9999037},"labels":[],"label_agreement":null},{"id":"W4410734654","doi":"10.35833/mpce.2024.000469","title":"Cost-aware Flexibility Evaluation for Microgrids","year":2024,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Flexibility (engineering); Reliability engineering; Risk analysis (engineering); Computer science; Engineering; Business; Economics","score_opus":0.033498996096947356,"score_gpt":0.27394518338181967,"score_spread":0.24044618728487233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410734654","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06367292,0.02147584,0.90716076,0.00010170839,0.006036179,0.00020295965,0.000015278285,0.00010715539,0.0012271741],"genre_scores_gemma":[0.99896085,0.00024338487,0.00011061702,0.000023869248,0.0003757741,0.00002794356,0.000004744113,0.000038750124,0.00021404734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895155,0.000039127688,0.00042335948,0.0001380387,0.00027830797,0.00016958942],"domain_scores_gemma":[0.9995105,0.00004909567,0.000059688242,0.00014618326,0.00014867536,0.0000858547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080455665,0.00013563404,0.00021913738,0.00013608477,0.000035242447,0.00013507693,0.00009832568,0.000069492446,0.000013215991],"category_scores_gemma":[0.000011171942,0.00011422107,0.0001107698,0.000075598655,0.000015793106,0.00018994727,0.0000195072,0.0000867966,0.000001139985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030490453,0.000024698451,0.000031817406,0.00031645797,0.00037581686,0.000015607475,0.00033257145,0.8357572,0.00063836685,0.00298543,0.02313511,0.13635646],"study_design_scores_gemma":[0.0003508974,0.000091284805,0.0001768019,0.00018081172,0.00008449995,0.00006655375,0.00020227105,0.823116,0.000505936,0.0006168639,0.17447802,0.00013003834],"about_ca_topic_score_codex":0.000018435596,"about_ca_topic_score_gemma":0.000022674774,"teacher_disagreement_score":0.93528795,"about_ca_system_score_codex":0.00016909704,"about_ca_system_score_gemma":0.00003278496,"threshold_uncertainty_score":0.46578002},"labels":[],"label_agreement":null},{"id":"W4410810570","doi":"10.1109/fccm62733.2025.00045","title":"Chronbench: An Incremental HDL Benchmark Suite","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Suite; Benchmark (surveying); Computer science; Geology","score_opus":0.004720689537096986,"score_gpt":0.20760507822377233,"score_spread":0.20288438868667535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410810570","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24673279,0.00013740141,0.0076195025,0.0001060928,0.0012680148,0.0001301245,0.000002069823,0.00075300946,0.743251],"genre_scores_gemma":[0.9942511,0.00002767048,0.001380542,0.00031050373,0.00011352337,0.000024406947,0.000031905434,0.000016140957,0.0038442367],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993689,0.000010247443,0.00014151652,0.00015226772,0.00010999359,0.00021706612],"domain_scores_gemma":[0.9996309,0.0000127696085,0.000005956494,0.00029051464,0.0000099133,0.000049906495],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009341803,0.00012051603,0.000093135895,0.000127756,0.000041383522,0.000039431223,0.0001779826,0.000037317368,0.0009373],"category_scores_gemma":[0.0000043095206,0.00012249291,0.000030195213,0.000216545,0.000015305977,0.00016288742,0.000079162266,0.00006548164,0.00007885133],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013794115,0.00016494103,0.012132747,0.00025518844,0.0004905116,0.000041663894,0.00021391899,0.38439628,0.013157245,0.14282282,0.40406215,0.042248737],"study_design_scores_gemma":[0.0013512284,0.000108211134,0.105455376,0.000068426416,0.000082531355,0.0000034715501,0.000495842,0.29453456,0.04275498,0.001658063,0.5525563,0.00093100383],"about_ca_topic_score_codex":0.00012781937,"about_ca_topic_score_gemma":0.00028636234,"teacher_disagreement_score":0.7475183,"about_ca_system_score_codex":0.00012319592,"about_ca_system_score_gemma":0.000007935149,"threshold_uncertainty_score":0.999976},"labels":[],"label_agreement":null},{"id":"W4410864334","doi":"10.3390/smartcities8030088","title":"Fairness-Oriented Volt–Watt Control Methods of PV Units for Over-Voltage Suppression in PV-Enriched Smart Cities","year":2025,"lang":"en","type":"article","venue":"Smart Cities","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Emera; Atlantic Canada Opportunities Agency; Mitacs","keywords":"Watt; Volt; Photovoltaic system; Electrical engineering; Voltage; Control (management); Computer science; Automotive engineering; Power (physics); Engineering; Physics","score_opus":0.013405735849947982,"score_gpt":0.2709698441236685,"score_spread":0.2575641082737205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410864334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30879265,0.0014833518,0.6647508,0.00021455735,0.0057335086,0.0011649183,0.00019439193,0.0006463735,0.017019417],"genre_scores_gemma":[0.9905775,0.000091458496,0.0032467798,0.00018115595,0.0001404223,0.000489896,0.00010971208,0.00007439997,0.0050886646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99794436,0.00015100167,0.00070254575,0.00035284486,0.00026970045,0.0005795729],"domain_scores_gemma":[0.9983464,0.00077206304,0.00009270769,0.00053312,0.00018625143,0.000069455884],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007124802,0.00039258366,0.0006898513,0.00070021965,0.00009970817,0.000048404,0.0003371748,0.00019046807,0.000091653594],"category_scores_gemma":[0.00034553304,0.0004031103,0.00014462277,0.00080651575,0.0001489183,0.00027193988,0.00015343288,0.00022689697,0.0000032949981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001108024,0.0003407386,0.16538446,0.007170791,0.0021758818,0.00003774039,0.006669267,0.3697888,0.061953746,0.24360414,0.13249563,0.009270786],"study_design_scores_gemma":[0.012291032,0.00031410565,0.13927391,0.0012672421,0.00045352933,0.0000026233163,0.010297376,0.28434536,0.089556254,0.014536307,0.44584244,0.0018198335],"about_ca_topic_score_codex":0.000262574,"about_ca_topic_score_gemma":0.00023048001,"teacher_disagreement_score":0.68178487,"about_ca_system_score_codex":0.00018345949,"about_ca_system_score_gemma":0.00006517364,"threshold_uncertainty_score":0.99984205},"labels":[],"label_agreement":null},{"id":"W4410889971","doi":"10.5267/j.ijiec.2025.4.006","title":"A game-theoretic model for renewable and conventional energy generators under tradable green certificate mechanism","year":2025,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Qinglan Project of Jiangsu Province of China; Yangzhou University; National Natural Science Foundation of China","keywords":"Renewable energy; Certificate; Mechanism (biology); Environmental economics; Economics; Microeconomics; Biochemical engineering; Computer science; Mathematical economics; Engineering; Physics; Electrical engineering","score_opus":0.04296534069602469,"score_gpt":0.24443885250590533,"score_spread":0.20147351180988066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410889971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01413845,0.00013815971,0.98207265,0.00070288905,0.0026489147,0.00007717134,0.000023483588,0.000067042536,0.00013126308],"genre_scores_gemma":[0.9890454,0.000053039752,0.009958907,0.000085128784,0.00048024,0.00002267216,0.000026894857,0.000028517683,0.00029918892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902993,0.000011723145,0.00046814964,0.00011336443,0.00022698105,0.00014983123],"domain_scores_gemma":[0.999415,0.00012982578,0.000083961866,0.00007087077,0.00023120147,0.00006917017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018808742,0.00014331233,0.00017872988,0.00049401284,0.00003731695,0.00008393323,0.0002349377,0.000087287415,0.000008238202],"category_scores_gemma":[0.00003981827,0.00015470826,0.00009914706,0.00015951264,0.000020543448,0.00015363107,0.000035643647,0.00013331154,4.0086272e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001819664,0.000018084054,0.000005926314,0.000011337517,0.00036972805,0.000002747883,0.000024053923,0.8534623,0.00072201417,0.14297162,0.0014886596,0.00090534537],"study_design_scores_gemma":[0.0011828805,0.000022003194,0.000014246761,0.00010561369,0.000060373506,0.000014922535,0.000016753886,0.9657757,0.002455749,0.027205551,0.003024898,0.000121279365],"about_ca_topic_score_codex":0.00002233418,"about_ca_topic_score_gemma":0.000005860326,"teacher_disagreement_score":0.974907,"about_ca_system_score_codex":0.00018405478,"about_ca_system_score_gemma":0.00008420497,"threshold_uncertainty_score":0.630882},"labels":[],"label_agreement":null},{"id":"W4411014668","doi":"10.3386/w33836","title":"Take the Load Off: Effort and Technology as Determinants of Electricity Demand Response","year":2025,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada First Research Excellence Fund; University of Alberta; University of Calgary","keywords":"Demand response; Electricity; Electricity demand; Response time; Economics; Environmental economics; Computer science; Business; Electricity generation; Engineering; Power (physics); Electrical engineering; Computer graphics (images)","score_opus":0.09816702671126142,"score_gpt":0.4262062744734677,"score_spread":0.3280392477622063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411014668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56094027,0.007805435,0.000021058917,0.0009602759,0.0007986145,0.0011091906,0.00008285425,0.00008976165,0.42819256],"genre_scores_gemma":[0.9835889,0.0057110214,0.000053419477,0.000007639758,0.0001522165,0.00014244214,0.000028605851,0.000033383232,0.010282379],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99772555,0.000095072864,0.0006154546,0.00031761898,0.0009273887,0.00031890042],"domain_scores_gemma":[0.9975663,0.0009372268,0.00013939173,0.00040482645,0.00090602715,0.000046243422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006431017,0.00018227105,0.0004458295,0.0014111588,0.00008124512,0.000021663425,0.0005418198,0.0003683537,0.000065066684],"category_scores_gemma":[0.0022730688,0.00016209365,0.00007183744,0.0004515391,0.00029850157,0.000051781368,0.00028574603,0.0005471973,0.000013735283],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022794094,0.00032895335,0.031104026,0.0060090446,0.004630704,0.000133879,0.000247332,0.16284254,0.0037148234,0.14306834,0.54512274,0.100518204],"study_design_scores_gemma":[0.0024221414,0.00077615125,0.045746624,0.00096655334,0.0002008414,0.00024695403,0.0001417565,0.064408995,0.031312913,0.17401484,0.6786051,0.0011571533],"about_ca_topic_score_codex":0.00047183485,"about_ca_topic_score_gemma":0.00031830146,"teacher_disagreement_score":0.42264864,"about_ca_system_score_codex":0.0016023816,"about_ca_system_score_gemma":0.0026622824,"threshold_uncertainty_score":0.6609987},"labels":[],"label_agreement":null},{"id":"W4411047828","doi":"10.1016/j.apenergy.2025.126193","title":"Smart home integration and distribution network optimization through transactive energy framework – a review","year":2025,"lang":"en","type":"review","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Transactive memory; Computer science; Smart grid; Distribution (mathematics); Embedded system; Engineering; Knowledge management; Electrical engineering","score_opus":0.010073967528430846,"score_gpt":0.23205648461233058,"score_spread":0.22198251708389974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411047828","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[4.1375534e-9,0.5046107,0.4898234,0.000010598669,0.00047480763,0.0001853609,0.000027560622,0.00023814256,0.0046294234],"genre_scores_gemma":[0.000018565324,0.9873602,0.005270107,0.00028556518,0.0004514563,0.0014752918,0.004839817,0.00011657969,0.00018242777],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977858,0.000102295926,0.000779616,0.00062354986,0.00024735872,0.0004613849],"domain_scores_gemma":[0.9988608,0.00024679536,0.00018138469,0.0005847962,0.000042507847,0.00008374747],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015834745,0.0007644813,0.0016542297,0.000105793275,0.00011990965,0.000072490446,0.0002863876,0.0005761078,0.00004595737],"category_scores_gemma":[0.000014837528,0.0007301758,0.00027366544,0.0011922108,0.00004997359,0.00013593413,0.0000795787,0.00036158806,0.0000057616176],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027826416,0.000014057388,1.20399575e-8,0.013991461,0.000283188,0.0000021301728,0.000007080964,0.21757835,2.9479327e-8,0.14580885,0.006634675,0.61567736],"study_design_scores_gemma":[0.00009260321,0.000013906678,1.214238e-7,0.037890375,0.0011169374,0.000003565788,0.0000031197274,0.0046893,0.0000030100673,0.0019032861,0.9536687,0.0006150587],"about_ca_topic_score_codex":0.00004795292,"about_ca_topic_score_gemma":0.000025555644,"teacher_disagreement_score":0.94703406,"about_ca_system_score_codex":0.00034923918,"about_ca_system_score_gemma":0.000057439083,"threshold_uncertainty_score":0.99951494},"labels":[],"label_agreement":null},{"id":"W4411171821","doi":"10.1109/access.2025.3578524","title":"An Improved MCDM Model to Support Smart Energy Management System in Smart Grid Paradigm","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Smart grid; Computer science; Multiple-criteria decision analysis; Grid; Systems engineering; Operations research; Engineering; Electrical engineering; Mathematics","score_opus":0.014922662692235886,"score_gpt":0.2575667728337426,"score_spread":0.2426441101415067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411171821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19445187,0.00010027771,0.71647686,0.0002786837,0.009279181,0.0010667002,0.000034366996,0.0019078221,0.07640422],"genre_scores_gemma":[0.99602664,0.00004033716,0.00096597266,0.0006552944,0.00017148962,0.00066875,0.000035489968,0.000070256654,0.0013658035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980393,0.000034073182,0.00051891065,0.00054354814,0.0002445624,0.0006196066],"domain_scores_gemma":[0.9987894,0.000018432103,0.00003524959,0.0009626523,0.000025175566,0.00016906767],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026205808,0.0003456278,0.00035733674,0.00069003104,0.000053687414,0.0002151108,0.0010703544,0.0001025261,0.000016923648],"category_scores_gemma":[0.0000024873893,0.0003856673,0.00007202623,0.0007926059,0.000015208002,0.0005052604,0.00021750465,0.00012811183,0.000034472803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025652273,0.000060321097,0.0013241565,0.00036284208,0.00012299336,0.00006463121,0.000055863085,0.96543366,0.00030288092,0.008425488,0.01869052,0.005130994],"study_design_scores_gemma":[0.00071996613,0.000041171472,0.0049033426,0.00013206045,0.00005577375,0.000001699054,0.00005251899,0.9476078,0.003958829,0.0002474414,0.04178294,0.0004964137],"about_ca_topic_score_codex":0.0005204776,"about_ca_topic_score_gemma":0.0011897977,"teacher_disagreement_score":0.80157477,"about_ca_system_score_codex":0.00048409047,"about_ca_system_score_gemma":0.000025367226,"threshold_uncertainty_score":0.9998595},"labels":[],"label_agreement":null},{"id":"W4411270987","doi":"10.1109/tsg.2025.3579648","title":"Frequency Reserve Service From Heat Pumps and Electrolyzers in Power Systems: A Sealed-Bid Auction Mechanism","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ontario Ministry of Research and Innovation","keywords":"Mechanism (biology); Service (business); Power (physics); Automotive engineering; Computer science; Environmental science; Engineering; Business; Thermodynamics; Physics","score_opus":0.006319783269904395,"score_gpt":0.1950863874720105,"score_spread":0.1887666042021061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411270987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53342426,0.00049510074,0.45265102,0.0009805486,0.008226737,0.00063260813,0.00009040173,0.0007573557,0.0027419894],"genre_scores_gemma":[0.99854225,0.0002705737,0.0002494444,0.00027207262,0.00007662146,0.0002778656,0.000015824193,0.000049904356,0.00024543318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985028,0.000083505336,0.00037732243,0.00041544138,0.000226809,0.00039411552],"domain_scores_gemma":[0.9993087,0.000082724175,0.000019801553,0.00045062686,0.000048753118,0.00008941335],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019342064,0.00028917252,0.00029563435,0.0005303643,0.000120954624,0.00007580729,0.00017765169,0.00017403472,0.000066304194],"category_scores_gemma":[0.0000027691804,0.0003269899,0.00006772329,0.0007805362,0.000018997109,0.00027131673,0.0000032250632,0.00041135095,0.000050854298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006361373,0.00010507125,0.0001694204,0.00018962641,0.00032816242,0.000024451998,0.00028484542,0.9754654,0.021511523,0.0006660108,0.0009730454,0.00021882236],"study_design_scores_gemma":[0.0045608743,0.00028523168,0.007079885,0.0010290699,0.0003894403,0.000027667389,0.0011538455,0.8754241,0.096975096,0.0022720087,0.009224612,0.0015782119],"about_ca_topic_score_codex":0.006616252,"about_ca_topic_score_gemma":0.005145353,"teacher_disagreement_score":0.46511802,"about_ca_system_score_codex":0.00039978817,"about_ca_system_score_gemma":0.000030277506,"threshold_uncertainty_score":0.99999875},"labels":[],"label_agreement":null},{"id":"W4411271941","doi":"10.1109/ias55788.2024.11023737","title":"A Cost-Effective and Eco-Friendly Micro-Grid by Employing a Model-Free Multi-Agent Reinforcement Learning Strategy for Power Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Reinforcement learning; Reinforcement; Computer science; Grid; Environmentally friendly; Power grid; Power (physics); Artificial intelligence; Engineering; Mathematics","score_opus":0.01889808426368873,"score_gpt":0.2544526734960746,"score_spread":0.23555458923238587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411271941","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009453214,0.0011726314,0.9706105,0.000093079725,0.0007501362,0.0029134222,0.000026135227,0.001158843,0.013822026],"genre_scores_gemma":[0.95263815,0.0005781533,0.028246615,0.00017747114,0.00012252432,0.004527077,0.00012343522,0.00022920931,0.0133573515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983198,0.000019892155,0.00034049514,0.00051525794,0.00023169398,0.0005728444],"domain_scores_gemma":[0.9993943,0.000069733775,0.0000247784,0.00034773885,0.000029583865,0.00013386647],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030442234,0.00037632734,0.0002436228,0.00022371464,0.00012757926,0.00028067816,0.00024177904,0.0000774949,0.00007246877],"category_scores_gemma":[0.000010978513,0.00036900252,0.000106749365,0.00017605945,0.000028041373,0.00025532048,0.00029260988,0.00020568572,0.00003395719],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016761089,0.000021481519,0.000016840042,0.00045083772,0.00048015616,0.000017915936,0.00029461732,0.9369047,0.000981074,0.0031860832,0.049190484,0.008439043],"study_design_scores_gemma":[0.0010103221,0.00014577906,0.00004983605,0.00009100026,0.000091721566,0.0000029416437,0.00038860604,0.8609436,0.0018921832,0.00006865082,0.13491501,0.0004003019],"about_ca_topic_score_codex":0.000023380902,"about_ca_topic_score_gemma":0.000020718024,"teacher_disagreement_score":0.943185,"about_ca_system_score_codex":0.0003267447,"about_ca_system_score_gemma":0.000008413291,"threshold_uncertainty_score":0.9998762},"labels":[],"label_agreement":null},{"id":"W4411272673","doi":"10.1016/j.renene.2025.123678","title":"Multi-agent systems in networked microgrids: Reinforcement learning and strategic pricing mechanisms","year":2025,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Government of Alberta","keywords":"Reinforcement learning; Reinforcement; Computer science; Business; Distributed computing; Engineering; Artificial intelligence; Structural engineering","score_opus":0.009939780422572481,"score_gpt":0.20426047123902322,"score_spread":0.19432069081645073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411272673","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031331677,0.010612364,0.917234,0.000030457337,0.002501107,0.00030449504,6.1043454e-7,0.00072448835,0.03726081],"genre_scores_gemma":[0.99001384,0.0017700506,0.0015468561,0.0000430261,0.00007731478,0.000110545145,0.00001579176,0.00003923932,0.0063833306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998685,0.000053207514,0.00038093975,0.00028834236,0.00013839216,0.00045413963],"domain_scores_gemma":[0.99962884,0.00003770279,0.000042367246,0.00020318979,0.000019595265,0.00006830731],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024231078,0.00023922496,0.00027190577,0.00030151443,0.00008047486,0.00010170707,0.00013336788,0.00010066315,0.000013732494],"category_scores_gemma":[0.0000067112296,0.0002561594,0.000035759072,0.0004511333,0.000014258763,0.000076100376,0.00011753391,0.000120981545,0.0000025792099],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000047562717,0.000012930814,0.000113422306,0.00012511079,0.000076287804,0.000015475125,0.000028093024,0.9844596,0.008810324,0.0056929886,0.00023171418,0.00042931846],"study_design_scores_gemma":[0.00062775554,0.000024742658,0.000074850286,0.00024216558,0.000019949352,0.000002002462,0.0003502394,0.97241545,0.003870957,0.00021821685,0.021915928,0.00023775818],"about_ca_topic_score_codex":0.0056127724,"about_ca_topic_score_gemma":0.0008202784,"teacher_disagreement_score":0.9586822,"about_ca_system_score_codex":0.00026647665,"about_ca_system_score_gemma":0.000021840531,"threshold_uncertainty_score":0.9999891},"labels":[],"label_agreement":null},{"id":"W4411363159","doi":"10.1088/2753-3751/ade548","title":"Process and policy insights from an intercomparison of open electricity system capacity expansion models","year":2025,"lang":"en","type":"article","venue":"Environmental Research Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"Alfred P. Sloan Foundation","keywords":"Electricity system; Process (computing); Electricity; Environmental science; Environmental economics; Computer science; Economics; Engineering; Electricity generation; Physics","score_opus":0.034427544336703315,"score_gpt":0.3101987950560601,"score_spread":0.27577125071935676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411363159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9754372,0.0005303444,0.010551121,0.000031064512,0.000068995025,0.0001875527,0.000013998859,0.00006834192,0.013111362],"genre_scores_gemma":[0.9991154,0.00031728836,0.00016104545,0.000021120442,0.000054328902,0.00010227751,0.000035787314,0.00002615551,0.0001665766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847436,0.00018127634,0.00025506335,0.00034960208,0.00042457526,0.0003151404],"domain_scores_gemma":[0.99935544,0.00007048883,0.000024652667,0.0004115428,0.000011324144,0.00012655238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020309302,0.0001612306,0.00025125963,0.00040311858,0.000111895366,0.0000703129,0.00059477775,0.00008362601,0.000014407169],"category_scores_gemma":[0.000012124182,0.00015926723,0.00002387953,0.00036848238,0.00012292987,0.00048927404,0.0005915105,0.00020059681,0.0000033332524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021739602,0.0006483751,0.0021398703,0.0003884929,0.00035842345,0.00001836277,0.0016944791,0.71793586,0.14321421,0.10905082,0.0010675174,0.023266211],"study_design_scores_gemma":[0.0006036694,0.00012450467,0.009518649,0.0001588214,0.000012589253,8.2503465e-7,0.0011466248,0.7531435,0.22412829,0.009003296,0.0019329713,0.00022629113],"about_ca_topic_score_codex":0.0066633406,"about_ca_topic_score_gemma":0.00038181798,"teacher_disagreement_score":0.10004752,"about_ca_system_score_codex":0.0005784736,"about_ca_system_score_gemma":0.000027513779,"threshold_uncertainty_score":0.99995136},"labels":[],"label_agreement":null},{"id":"W4411392800","doi":"10.20944/preprints202506.1369.v1","title":"Against High-Tech Global and Grid Approaches to Energy Transition: Post-Liberalism, Open Sourced Metabolism, and the Telos of Local Sustainability","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Environment and Climate Change Canada","funders":"","keywords":"Telos; Sustainability; Liberalism; Energy transition; Grid; Transition (genetics); Environmental economics; Political science; Economics; Geography; Chemistry; Ecology; Philosophy; Biology; Epistemology; Law; Geodesy","score_opus":0.06042052751784328,"score_gpt":0.26678540120531635,"score_spread":0.20636487368747308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411392800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94752693,0.00088419573,0.033806656,0.007861435,0.0008001222,0.0023032476,0.0002640409,0.0003759901,0.0061773797],"genre_scores_gemma":[0.9974487,0.00024716463,0.00059476495,0.000536237,0.00019792626,0.0005720322,0.00010070837,0.000041446565,0.00026105734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9971951,0.00030471582,0.0006956414,0.0010414855,0.00033813855,0.00042490245],"domain_scores_gemma":[0.99790347,0.00010957477,0.0001151804,0.001518856,0.00017502106,0.00017791273],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010325914,0.00056008715,0.0009609056,0.00015123635,0.00011242689,0.000096357,0.0011835898,0.00032224238,0.000037661444],"category_scores_gemma":[0.00008817163,0.0004926498,0.00020442299,0.00033569033,0.0003828539,0.0001394533,0.0052473596,0.00045095876,0.0000037936522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043244383,0.0000851047,0.0018708735,0.0013915773,0.0010982974,0.000010037423,0.0019186371,0.9350746,0.00004820574,0.05154746,0.0002068427,0.006315899],"study_design_scores_gemma":[0.015353164,0.000104919694,0.6224552,0.00138636,0.0033695619,0.00004205605,0.007991132,0.12578723,0.044435833,0.08040897,0.09303119,0.005634429],"about_ca_topic_score_codex":0.0040295953,"about_ca_topic_score_gemma":0.00030880337,"teacher_disagreement_score":0.8092874,"about_ca_system_score_codex":0.0003227181,"about_ca_system_score_gemma":0.00012220183,"threshold_uncertainty_score":0.9997525},"labels":[],"label_agreement":null},{"id":"W4411489131","doi":"10.3390/en18133245","title":"A Review of Optimization Strategies for Energy Management in Microgrids","year":2025,"lang":"en","type":"review","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Université de Sherbrooke","keywords":"Environmental economics; Renewable energy; Fossil fuel; Electrification; Energy management; Greenhouse gas; Risk analysis (engineering); Climate change; Computer science; Environmental resource management; Electricity; Business; Engineering; Environmental science; Energy (signal processing); Economics; Ecology","score_opus":0.014932278476376978,"score_gpt":0.27653018459380174,"score_spread":0.2615979061174248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411489131","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.8880187e-8,0.96658844,0.02008525,0.0000059113604,0.00060328824,0.00053329597,0.000020292968,0.00015144673,0.012012048],"genre_scores_gemma":[2.4929918e-7,0.9883916,0.008821113,0.000052364652,0.00007290835,0.0015969662,0.00036106954,0.000062908446,0.0006408202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984826,0.000049023078,0.00080865814,0.00028206685,0.00012006044,0.00025757734],"domain_scores_gemma":[0.9992688,0.00010398338,0.00012629795,0.000444467,0.00003514568,0.000021354086],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017914448,0.0004028492,0.0013179858,0.00057968596,0.00001651874,0.000029582916,0.00037734333,0.00013430137,0.000023267208],"category_scores_gemma":[0.000011584389,0.00038677358,0.0003413662,0.0006888886,0.000023549022,0.00009564058,0.00012134966,0.0000772483,0.0000010412313],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.557222e-7,0.000008684988,1.0336233e-8,0.28265682,0.00016237565,0.0000015848077,0.000002550875,0.38492075,1.369965e-8,0.008944957,0.009448974,0.31385282],"study_design_scores_gemma":[0.00009449186,0.000007932999,5.3751453e-8,0.15283412,0.00045399278,5.430096e-7,0.000016709275,0.001435652,0.0000018569468,0.00005917831,0.84484637,0.00024909055],"about_ca_topic_score_codex":0.000015420475,"about_ca_topic_score_gemma":0.000016369828,"teacher_disagreement_score":0.8353974,"about_ca_system_score_codex":0.00014367359,"about_ca_system_score_gemma":0.00006500669,"threshold_uncertainty_score":0.99985844},"labels":[],"label_agreement":null},{"id":"W4411617996","doi":"10.51847/yxgp5etyb3","title":"10.51847/yxgP5eTyb3","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microgrid; Particle swarm optimization; Multi-swarm optimization; Computer science; Mathematical optimization; Artificial intelligence; Mathematics; Algorithm","score_opus":0.0035023101509749567,"score_gpt":0.14233308731749567,"score_spread":0.1388307771665207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411617996","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012707904,0.000046319998,0.00001463184,0.000067466724,0.000010415315,0.00007763556,0.0000024045235,0.00063409423,0.9978762],"genre_scores_gemma":[0.0009810415,9.811223e-7,0.0002186438,0.000040892337,0.00017006841,0.000023097342,0.000010458939,0.000028734254,0.9985261],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994364,0.000006914361,0.00010489687,0.00011946038,0.000110177876,0.00022216068],"domain_scores_gemma":[0.99962777,0.000011346147,0.0000038195403,0.0002621695,0.000007841621,0.00008704558],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000051839113,0.00011099808,0.00009536658,0.00005811991,0.000023713386,0.000023302433,0.0001516745,0.000030755218,0.98695314],"category_scores_gemma":[0.0000040488794,0.00012167065,0.000032108983,0.0001633491,0.000007259905,0.000058062655,0.00002354982,0.000049170925,0.97513705],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051266434,0.000007632097,1.00621556e-7,0.0000068460126,0.000023322096,0.0000051063093,0.0000063300304,0.2722247,0.000046850444,0.0000033432125,0.15187329,0.5757974],"study_design_scores_gemma":[0.00009720427,0.0000211222,0.00007328844,0.00000725187,0.000008232635,0.0000014914555,2.7076555e-7,0.013545185,0.00006691312,0.000001070895,0.9860293,0.00014864224],"about_ca_topic_score_codex":0.000005922456,"about_ca_topic_score_gemma":1.1946648e-7,"teacher_disagreement_score":0.83415604,"about_ca_system_score_codex":0.000044739325,"about_ca_system_score_gemma":0.0000024011492,"threshold_uncertainty_score":0.4961585},"labels":[],"label_agreement":null},{"id":"W4411618014","doi":"10.51847/t0bfrink50","title":"10.51847/T0BfRINk50","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Algorithm; Computer science; Optimization algorithm; Mathematical optimization; Mathematics","score_opus":0.0035677624482906923,"score_gpt":0.14259546805957185,"score_spread":0.13902770561128117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411618014","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015851589,0.000037125974,0.000013315532,0.00006410399,0.000010264193,0.00007686476,0.0000022077434,0.0006480647,0.9975629],"genre_scores_gemma":[0.0010956259,7.554679e-7,0.00021066572,0.000033911332,0.00016683823,0.000023172246,0.000006680524,0.00003794061,0.9984244],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999438,0.000006835808,0.0001029737,0.00011888879,0.000109016226,0.00022429592],"domain_scores_gemma":[0.999626,0.000010625029,0.0000037270959,0.00026288076,0.000007505787,0.00008929827],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000050826347,0.000110206835,0.0000931082,0.0000616333,0.000023008915,0.000022687846,0.00015450353,0.000030437628,0.9884413],"category_scores_gemma":[0.0000038598278,0.00011986756,0.00003044937,0.00015919728,0.0000068674312,0.00005634068,0.000025756317,0.000050540126,0.9854718],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004843335,0.0000072603393,1.4988673e-7,0.0000057196557,0.000022048222,0.000005270211,0.0000060234033,0.27385232,0.000039231567,0.000003479283,0.13435522,0.5916984],"study_design_scores_gemma":[0.00009461032,0.000020659712,0.00008524426,0.0000067964006,0.000007695696,0.0000014796418,2.6906002e-7,0.011824939,0.00006763864,0.0000010909475,0.987742,0.00014756249],"about_ca_topic_score_codex":0.000006065927,"about_ca_topic_score_gemma":1.2535503e-7,"teacher_disagreement_score":0.8533868,"about_ca_system_score_codex":0.00004453219,"about_ca_system_score_gemma":0.000002396435,"threshold_uncertainty_score":0.48880574},"labels":[],"label_agreement":null},{"id":"W4411618020","doi":"10.51847/opihbd5ebu","title":"10.51847/OPiHBd5eBu","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Shunt (medical); Control theory (sociology); Computer science; Medicine; Mathematics; Artificial intelligence; Cardiology","score_opus":0.0035606729027329574,"score_gpt":0.1429091630132592,"score_spread":0.13934849011052625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411618020","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012783594,0.000038849234,0.000013900799,0.00007360739,0.000011102004,0.00007699649,0.0000023793823,0.0006266867,0.99787813],"genre_scores_gemma":[0.0008788284,7.9091814e-7,0.00020223482,0.00004047603,0.00017478157,0.000022503646,0.0000074724107,0.00003675933,0.9986361],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99944806,0.0000068003847,0.00010273043,0.00011729717,0.00010744722,0.00021764902],"domain_scores_gemma":[0.9996356,0.000010849601,0.0000037421728,0.00025771424,0.000007625297,0.000084504994],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000046959853,0.0001084484,0.00009320737,0.00006009607,0.000023278397,0.000023072062,0.0001500545,0.000030182931,0.9877193],"category_scores_gemma":[0.0000038295866,0.00011893546,0.000030210744,0.0001563798,0.0000070520855,0.000056592333,0.000023401619,0.000047773992,0.9852976],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004999488,0.000007707968,1.563449e-7,0.0000066559105,0.00002290506,0.0000054956527,0.0000064339533,0.21859923,0.00003750149,0.0000037184486,0.17711473,0.60419047],"study_design_scores_gemma":[0.00009439216,0.000020992058,0.000103135666,0.000006440721,0.000007835696,0.0000014385719,2.4758086e-7,0.01185526,0.000064313484,0.0000011529304,0.9876995,0.00014526803],"about_ca_topic_score_codex":0.000008791272,"about_ca_topic_score_gemma":1.568826e-7,"teacher_disagreement_score":0.8105848,"about_ca_system_score_codex":0.00004305182,"about_ca_system_score_gemma":0.00000237773,"threshold_uncertainty_score":0.48500472},"labels":[],"label_agreement":null},{"id":"W4411652026","doi":"10.1016/j.rser.2025.115929","title":"Bridging theory and practice: A comprehensive review of virtual power plant technologies and their real-world applications","year":2025,"lang":"en","type":"review","venue":"Renewable and Sustainable Energy Reviews","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; Huawei Technologies (Canada)","funders":"Huawei Technologies","keywords":"Bridging (networking); Computer science","score_opus":0.014433680079467773,"score_gpt":0.2760115330547324,"score_spread":0.26157785297526465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411652026","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.2239151e-7,0.9786078,0.006266972,0.0000563919,0.00006660306,0.0014264977,0.000034101777,0.00020800796,0.013333552],"genre_scores_gemma":[0.0000024173614,0.99240655,0.00026803833,0.00016341511,0.000044217246,0.0015309756,0.00012777247,0.00006338871,0.0053932522],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971383,0.0005007625,0.0010957085,0.00060303276,0.00013079763,0.0005313658],"domain_scores_gemma":[0.99721587,0.0012879295,0.0004246401,0.00084556604,0.0001395326,0.00008645509],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015200382,0.00071447185,0.0029284207,0.000588093,0.000172768,0.00007184278,0.00030719925,0.00021903946,0.000008777276],"category_scores_gemma":[0.00041345583,0.0005370899,0.00021703381,0.0011054495,0.000179918,0.00021398926,0.0006544816,0.00026140548,8.0842693e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034339191,0.000013472078,1.6961809e-7,0.265884,0.00023420161,0.000012254711,0.000014855338,0.00008131599,4.4473617e-7,0.05058583,0.0068938085,0.6762762],"study_design_scores_gemma":[0.00008470042,0.000029382709,1.2779527e-7,0.07266737,0.0007613119,0.000053146825,0.0006575773,0.000033313834,0.0000032571254,0.00048247888,0.92480475,0.0004225709],"about_ca_topic_score_codex":0.00021390556,"about_ca_topic_score_gemma":0.00002759155,"teacher_disagreement_score":0.91791093,"about_ca_system_score_codex":0.00014188823,"about_ca_system_score_gemma":0.00012780844,"threshold_uncertainty_score":0.99970806},"labels":[],"label_agreement":null},{"id":"W4411843961","doi":"10.1049/cth2.70033","title":"Guest Editorial: Knowledge‐Based Control and Optimization for Smart Energy Systems","year":2025,"lang":"en","type":"editorial","venue":"IET Control Theory and Applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Northwestern University; University of California, San Diego; National Science Foundation","keywords":"Control engineering; Computer science; Control (management); Control theory (sociology); Engineering; Artificial intelligence","score_opus":0.0028622739734900987,"score_gpt":0.21156731449802177,"score_spread":0.20870504052453168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411843961","genre_codex":"methods","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[9.577363e-8,0.0020864417,0.5164003,0.000024169794,0.4787422,0.00076783454,0.00072690385,0.00022896912,0.0010230803],"genre_scores_gemma":[0.0033590868,0.00041517368,0.00015627612,0.000040592946,0.98396504,0.00992717,0.0010785877,0.00008879531,0.000969254],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984752,0.00015152799,0.00042893452,0.000466061,0.00018718229,0.00029108286],"domain_scores_gemma":[0.9954554,0.003567176,0.000113707174,0.00045178123,0.00030011908,0.00011185017],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00077000464,0.0003969163,0.00055911456,0.0001904197,0.00023151464,0.00018123345,0.00023207569,0.00062492327,0.0000033267947],"category_scores_gemma":[0.00019671246,0.00041710632,0.00009012156,0.0001493656,0.00008445798,0.00007734449,0.000022986398,0.00023460867,0.0000019214099],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008766558,0.000027008502,4.0164835e-7,0.00036603434,0.00022991213,1.285498e-7,0.0000055216105,0.26320505,0.000012966732,0.029050214,0.7065861,0.000428977],"study_design_scores_gemma":[0.0023990397,0.000028601185,3.6675692e-7,0.00008045686,0.00041296362,1.1998573e-7,0.000010001229,0.20332305,0.000005611912,0.00071661227,0.7927382,0.00028499163],"about_ca_topic_score_codex":0.000019003888,"about_ca_topic_score_gemma":0.00001336294,"teacher_disagreement_score":0.51624405,"about_ca_system_score_codex":0.00009005262,"about_ca_system_score_gemma":0.00009050938,"threshold_uncertainty_score":0.9998281},"labels":[],"label_agreement":null},{"id":"W4411943015","doi":"10.1080/19401493.2025.2524379","title":"Development of a contextual bandits-based thermal mass preconditioning algorithm for dynamic electricity pricing","year":2025,"lang":"en","type":"article","venue":"Journal of Building Performance Simulation","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Thermal; Dynamic pricing; Electricity; Computer science; Mathematical optimization; Algorithm; Environmental science; Meteorology; Economics; Mathematics; Engineering; Physics; Microeconomics; Electrical engineering","score_opus":0.00840976397016027,"score_gpt":0.25266414608827537,"score_spread":0.2442543821181151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411943015","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48393723,0.000046580903,0.5155916,0.0000045377205,0.00026846345,0.00008843176,7.765051e-7,0.00001983363,0.000042510197],"genre_scores_gemma":[0.86781067,0.0000058951773,0.13206857,0.000012820397,0.00006187472,0.000008005802,0.000005216207,0.000013972205,0.000012999414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893135,0.000011959645,0.0006066729,0.00007927743,0.00019294664,0.00017776834],"domain_scores_gemma":[0.9993282,0.00014482734,0.00024646858,0.00007475889,0.00018097887,0.000024747424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004957087,0.000119009565,0.00021507891,0.00042313113,0.000106822925,0.000022667344,0.00011365564,0.00005276623,0.0000066756375],"category_scores_gemma":[0.00003195299,0.00011888043,0.00007264413,0.0002573412,0.000011037657,0.00028673877,0.000009894667,0.00012498385,2.781247e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029663075,0.0000139463855,0.0005910429,0.00013929447,0.00009040174,2.0673157e-7,0.00007969283,0.8789591,0.009489075,0.000018951136,0.000009377524,0.110579215],"study_design_scores_gemma":[0.0009210342,0.00006052188,0.012824597,0.00028671988,0.000039908766,5.3439396e-7,0.000021204303,0.92942613,0.055921588,0.000020010768,0.0003782921,0.000099477096],"about_ca_topic_score_codex":3.5788088e-7,"about_ca_topic_score_gemma":8.070785e-7,"teacher_disagreement_score":0.38387343,"about_ca_system_score_codex":0.00035048995,"about_ca_system_score_gemma":0.00008415267,"threshold_uncertainty_score":0.48478034},"labels":[],"label_agreement":null},{"id":"W4412470246","doi":"10.1016/j.engappai.2025.111650","title":"Deep reinforcement learning approach for hybrid renewable energy systems optimization","year":2025,"lang":"en","type":"article","venue":"Engineering Applications of Artificial Intelligence","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Reinforcement learning; Renewable energy; Artificial intelligence; Machine learning; Electrical engineering","score_opus":0.011187001591868525,"score_gpt":0.2170787683279472,"score_spread":0.20589176673607867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412470246","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000020358559,0.00044609103,0.9952192,0.000009404471,0.00026713623,0.00043334256,0.0000014430433,0.00038848625,0.0032145937],"genre_scores_gemma":[0.90722,0.00013997243,0.089760005,0.0000066252533,0.00012906862,0.0020539816,0.00011991999,0.000042600434,0.00052783126],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989294,0.0000071766394,0.00048931286,0.0002192853,0.0001222779,0.00023257268],"domain_scores_gemma":[0.9993812,0.000078895566,0.00005502692,0.00033554545,0.000107913474,0.00004142792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017111718,0.00016408857,0.00018752812,0.00029649312,0.00008419373,0.000045927278,0.000263973,0.000052933865,0.0000073144743],"category_scores_gemma":[0.000037848953,0.00020121364,0.00006109591,0.00052883854,0.000021688766,0.00008038893,0.000042874715,0.000076960256,0.0000022315369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038933927,0.00002116254,0.0000017045083,0.00022214068,0.000057485755,6.0613914e-8,0.000019611281,0.9559425,0.00048540102,0.03953138,0.00020224399,0.003512419],"study_design_scores_gemma":[0.000020896941,0.000014938553,6.0036285e-7,0.00002833767,0.00002600746,4.022731e-7,0.00008070446,0.9629901,0.028307442,0.00018590533,0.008191268,0.00015336384],"about_ca_topic_score_codex":0.000094901254,"about_ca_topic_score_gemma":0.000002491489,"teacher_disagreement_score":0.9071996,"about_ca_system_score_codex":0.00010797423,"about_ca_system_score_gemma":0.000012865361,"threshold_uncertainty_score":0.8205254},"labels":[],"label_agreement":null},{"id":"W4412658020","doi":"10.1016/j.enbuild.2025.116195","title":"Large-scale load profiling for energy flexibility in residential buildings: A data-driven approach for load aggregation through representative clusters","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo; Université de Sherbrooke; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Profiling (computer programming); Flexibility (engineering); Computer science; Scale (ratio); Environmental science; Geography; Statistics; Cartography; Mathematics; Operating system","score_opus":0.02177030608279975,"score_gpt":0.2795299699470222,"score_spread":0.2577596638642225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412658020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05419766,0.0008914087,0.94108784,0.00018635755,0.00057347846,0.00046056064,0.00007552288,0.00023024456,0.0022968957],"genre_scores_gemma":[0.78250974,0.0005591079,0.21196683,0.00048896315,0.00054931256,0.001269048,0.00082983536,0.00010009247,0.0017270729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780214,0.00004913882,0.00049129786,0.0008946388,0.0002498879,0.00051291054],"domain_scores_gemma":[0.9989362,0.0001909301,0.00009162055,0.0006079313,0.000118072916,0.000055272747],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006682209,0.0003003354,0.0003747288,0.00016749428,0.0001846562,0.00010513492,0.00042999006,0.0001769701,0.0000039192737],"category_scores_gemma":[0.00017195441,0.0003221081,0.00009163094,0.00042462378,0.00007635787,0.0006396739,0.00038570215,0.000108330474,1.56299e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005314402,0.00016192954,0.0005527986,0.0005747431,0.00033492738,0.000003290136,0.0014098124,0.8640806,0.0019060744,0.098404296,0.027488215,0.0045518726],"study_design_scores_gemma":[0.0024170764,0.000049229548,0.00007578223,0.00013417762,0.00009409212,0.0000016261336,0.0008677646,0.8565,0.031927135,0.0062126825,0.10131619,0.0004041998],"about_ca_topic_score_codex":0.00074192224,"about_ca_topic_score_gemma":0.0010519185,"teacher_disagreement_score":0.729121,"about_ca_system_score_codex":0.0003605221,"about_ca_system_score_gemma":0.000073505085,"threshold_uncertainty_score":0.9999231},"labels":[],"label_agreement":null},{"id":"W4412718299","doi":"10.1007/978-981-96-5238-9_40","title":"Optimizing Industrial Energy Management: Employing Machine Learning and Data Analytics for Sustainable Practices","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Sustainable energy; Analytics; Data analysis; Computer science; Data science; Energy (signal processing); Energy management; Manufacturing engineering; Knowledge management; Engineering management; Engineering; Data mining; Renewable energy; Electrical engineering; Physics","score_opus":0.036629290095339356,"score_gpt":0.2534628650138879,"score_spread":0.21683357491854852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412718299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010467687,0.069928065,0.8648278,0.00006656767,0.0014345656,0.00089472515,0.000023449627,0.00023404809,0.06258027],"genre_scores_gemma":[0.62116426,0.097212814,0.006920307,0.00032444834,0.010748541,0.00048753197,0.004229948,0.000990688,0.2579215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982115,0.000040855528,0.0004918281,0.000617651,0.00016927156,0.00046891364],"domain_scores_gemma":[0.99849755,0.000636272,0.00027719387,0.00048150646,0.00004229692,0.00006517932],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000649935,0.0004570695,0.0006196791,0.00039028408,0.00016806996,0.00040689527,0.00030263042,0.0005194932,0.000004729804],"category_scores_gemma":[0.00012320698,0.00046196743,0.000043248638,0.00012492253,0.000031009673,0.00018332081,0.00057004124,0.00065415766,1.1933999e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026415446,0.0000029442294,0.00014535169,0.0010713,0.0005072162,0.0000698402,0.000024064828,0.9600408,1.4819882e-7,0.019135322,0.0013160829,0.017660506],"study_design_scores_gemma":[0.00034911503,0.00001965348,9.108557e-7,0.0005751594,0.00020137128,0.0000039059337,0.000017451259,0.6062936,2.4463242e-7,0.00030220512,0.39197096,0.00026540627],"about_ca_topic_score_codex":0.00024007996,"about_ca_topic_score_gemma":0.00027226092,"teacher_disagreement_score":0.85790753,"about_ca_system_score_codex":0.00012391618,"about_ca_system_score_gemma":0.000013869596,"threshold_uncertainty_score":0.9997832},"labels":[],"label_agreement":null},{"id":"W4412860334","doi":"10.1016/j.apenergy.2025.126465","title":"Comparison of machine learning and MPC methods for control of home battery storage systems in distribution grids","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Mitacs","keywords":"Battery (electricity); Control (management); Battery storage; Model predictive control; Computer science; Control engineering; Engineering; Control theory (sociology); Artificial intelligence; Thermodynamics; Power (physics); Physics","score_opus":0.008306682692800882,"score_gpt":0.26951164954010165,"score_spread":0.26120496684730077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412860334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02550178,0.0020254517,0.97103024,0.000011900122,0.0003135782,0.00012901596,0.000018012583,0.00005945218,0.0009105982],"genre_scores_gemma":[0.9982318,0.00006168825,0.0013830643,0.0000069468692,0.000027326621,0.00013911631,0.00008783245,0.000016078302,0.00004610319],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992415,0.000044315613,0.00036186355,0.0001359953,0.00006337945,0.00015295616],"domain_scores_gemma":[0.99953806,0.0002367153,0.00006457395,0.00012113016,0.000018228307,0.000021264128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030302288,0.00011970967,0.00041053098,0.0001328349,0.000019821773,0.000008437421,0.00007678452,0.0000662894,0.0000021598466],"category_scores_gemma":[0.00001422561,0.000127298,0.000030805517,0.00019189376,0.000025630192,0.000023492606,0.000035858946,0.0000744519,1.06319675e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003367058,0.000025191013,0.00208452,0.00033896402,0.00008663684,1.690454e-7,0.000027546252,0.9298127,0.011490044,0.04895705,0.00017261982,0.006970857],"study_design_scores_gemma":[0.0010640712,0.000032387346,0.0022919662,0.0000475121,0.00004229027,1.5332311e-7,0.00008390056,0.9568658,0.011174824,0.00017499202,0.028104348,0.00011777887],"about_ca_topic_score_codex":0.0001409531,"about_ca_topic_score_gemma":0.000018737379,"teacher_disagreement_score":0.97273004,"about_ca_system_score_codex":0.00006431956,"about_ca_system_score_gemma":0.0000051754423,"threshold_uncertainty_score":0.51910615},"labels":[],"label_agreement":null},{"id":"W4412861358","doi":"10.2139/ssrn.5377029","title":"Mcd-Nilm: A Multi-Scale Clustering and Decoding Approach for Appliance and Ev Energy Disaggregation","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Decoding methods; Scale (ratio); Energy (signal processing); Computer science; Artificial intelligence; Algorithm; Mathematics; Geography; Statistics; Cartography","score_opus":0.010957519582973087,"score_gpt":0.226238455948142,"score_spread":0.2152809363651689,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412861358","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061837644,0.011142445,0.9808278,0.000065896376,0.0005420731,0.00029912413,0.000009912891,0.00013525088,0.00079372776],"genre_scores_gemma":[0.8855598,0.048400063,0.061405193,0.00006574486,0.0010726778,0.000537596,0.00008567066,0.00014446658,0.0027287952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977087,0.000031432,0.00036663798,0.00041987927,0.00014953532,0.0013238167],"domain_scores_gemma":[0.9994765,0.000044916178,0.00012198476,0.00023062665,0.00003957197,0.000086435546],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006912087,0.00035611153,0.00035865832,0.00021621196,0.0001821745,0.00016659993,0.00024641608,0.00021047996,0.0000010731092],"category_scores_gemma":[0.000017451963,0.00038436247,0.000096836724,0.00009558599,0.000032285236,0.00012186679,0.00025591365,0.0012274126,2.094744e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052879877,0.00004243881,0.0006430029,0.0010978673,0.0007749077,0.0000013969238,0.00025126926,0.81864864,0.0003085863,0.011551492,0.00017055043,0.16645698],"study_design_scores_gemma":[0.0008792551,0.000032905104,0.00016881528,0.00022130486,0.00012927211,0.000059577582,0.00028046226,0.9857989,0.00015690243,0.009945695,0.0019096434,0.0004172785],"about_ca_topic_score_codex":0.000050147995,"about_ca_topic_score_gemma":0.0008768386,"teacher_disagreement_score":0.9194226,"about_ca_system_score_codex":0.00089054817,"about_ca_system_score_gemma":0.00019263559,"threshold_uncertainty_score":0.9998608},"labels":[],"label_agreement":null},{"id":"W4412867174","doi":"10.1016/j.ijpe.2025.109696","title":"Optimal hour-ahead commitment and storage decisions of wind power producers","year":2025,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Business; Environmental economics; Wind power; Power (physics); Operations research; Operations management; Computer science; Environmental science; Microeconomics; Economics; Mathematics; Electrical engineering","score_opus":0.010963604441312632,"score_gpt":0.2331485780717375,"score_spread":0.22218497363042486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412867174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9844977,0.00025362385,0.0045644734,0.0018503655,0.0074756783,0.0000776025,0.0000057370066,0.000014481238,0.0012603012],"genre_scores_gemma":[0.9957722,0.0004869173,0.003079458,0.000040596235,0.00032118446,0.0000015376748,0.0000015555167,0.00001092634,0.0002856317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99926764,0.000012162954,0.00043967273,0.000109635046,0.00009564529,0.000075228425],"domain_scores_gemma":[0.99945456,0.000037014794,0.00015225504,0.00013162513,0.0001913191,0.000033209944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026542434,0.000086759355,0.00014843598,0.00034517492,0.000019948307,0.000031162162,0.00019535434,0.00002820725,0.000027530032],"category_scores_gemma":[0.00012141809,0.00009008934,0.000055283243,0.000058308076,0.00003944002,0.00025453945,0.000055978104,0.00010965277,0.0000021708265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049997238,0.000052158874,0.0012136815,0.0000071334393,0.00045439682,0.0000027635149,0.00013264752,0.9827749,0.0007934555,0.001527809,0.0067518004,0.00623927],"study_design_scores_gemma":[0.0043848976,0.00053382065,0.17189045,0.0009574981,0.00036219924,0.0005389153,0.0023336185,0.04890885,0.086627446,0.003943585,0.67850727,0.001011424],"about_ca_topic_score_codex":0.0000024960545,"about_ca_topic_score_gemma":0.0000038906746,"teacher_disagreement_score":0.933866,"about_ca_system_score_codex":0.00024464366,"about_ca_system_score_gemma":0.00003661843,"threshold_uncertainty_score":0.36737368},"labels":[],"label_agreement":null},{"id":"W4412920094","doi":"10.3390/su17156767","title":"A Two-Stage Sustainable Optimal Scheduling Strategy for Multi-Contract Collaborative Distributed Resource Aggregators","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Agriculture","funders":"National Natural Science Foundation of China","keywords":"Scheduling (production processes); Computer science; Environmental economics; Distributed computing; Business; Operations research; Resource (disambiguation); Process management; Industrial organization; Computer network; Operations management; Engineering; Economics","score_opus":0.010480225066979284,"score_gpt":0.2809537510801063,"score_spread":0.270473526013127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412920094","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48503444,0.000849434,0.5064075,0.0005558649,0.00031526267,0.003464712,0.00021902547,0.0010452708,0.002108478],"genre_scores_gemma":[0.9907541,0.0000073428655,0.005110969,0.00004576298,0.00007728321,0.0007427276,0.00015704871,0.000052456893,0.0030523003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99755776,0.0001164124,0.00050741975,0.00057162246,0.00018520933,0.0010615693],"domain_scores_gemma":[0.99766594,0.00025887927,0.000077629884,0.00067785947,0.0011690019,0.0001506617],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00090597937,0.00039386158,0.00043324826,0.00023183649,0.00032437543,0.00019700971,0.00035343308,0.00015383448,0.000029622106],"category_scores_gemma":[0.0015947314,0.00042768772,0.00015348713,0.001216594,0.00014938595,0.0003394658,0.00017269696,0.000291764,0.000001740739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015310418,0.000121664205,0.0017588958,0.0010961748,0.00017329419,0.000041449428,0.00024505577,0.9340298,0.00002052577,0.06047095,0.0009569766,0.0009320809],"study_design_scores_gemma":[0.003985965,0.00012314084,0.0049678427,0.00004762685,0.000112997135,6.317952e-7,0.03673695,0.82208997,0.0024970772,0.002121549,0.12661265,0.00070357457],"about_ca_topic_score_codex":0.000286224,"about_ca_topic_score_gemma":0.00010993833,"teacher_disagreement_score":0.50571966,"about_ca_system_score_codex":0.0029181659,"about_ca_system_score_gemma":0.0006305967,"threshold_uncertainty_score":0.9998175},"labels":[],"label_agreement":null},{"id":"W4412927139","doi":"10.21203/rs.3.rs-6289250/v1","title":"Three-Stage Optimization Model for Operation of Islanded Local Energy Network with Electric Vehicle Charging Station","year":2025,"lang":"","type":"preprint","venue":"Research Square","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Stage (stratigraphy); Charging station; Electric vehicle; Energy (signal processing); Automotive engineering; Computer science; Environmental science; Engineering; Physics; Geology; Power (physics)","score_opus":0.034152677446661735,"score_gpt":0.3067766174033636,"score_spread":0.27262393995670187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412927139","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012427226,0.000743475,0.9937676,0.00015139574,0.0002680613,0.002274751,0.00014032636,0.00014556345,0.0012660784],"genre_scores_gemma":[0.9468994,0.0025735192,0.043397892,0.000024188308,0.00058486534,0.0023256587,0.0020320632,0.00018019257,0.0019822202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99514145,0.00027062162,0.00089092867,0.0009982553,0.0014322301,0.0012664995],"domain_scores_gemma":[0.9968178,0.00044121555,0.00020423699,0.0009326571,0.0014410458,0.00016304276],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019863823,0.0005414785,0.0006684392,0.0010966031,0.00046952328,0.00023004242,0.00057565176,0.0004434576,0.00008042268],"category_scores_gemma":[0.00010447395,0.0005752983,0.00016790666,0.0017394726,0.0000928333,0.0003292592,0.0004835503,0.00082488917,0.000002548976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005952946,0.00010847987,0.00013575713,0.0031708353,0.0003673654,0.0000031572247,0.00035889682,0.96457535,0.00013812448,0.022171428,0.00083495385,0.00754035],"study_design_scores_gemma":[0.0014366987,0.0003807484,0.00011328155,0.0012412515,0.000083655745,2.7883644e-7,0.00015590203,0.9935035,0.0013066255,0.0008945283,0.00040064458,0.00048284777],"about_ca_topic_score_codex":0.0009542,"about_ca_topic_score_gemma":0.0017161543,"teacher_disagreement_score":0.9503697,"about_ca_system_score_codex":0.0012600044,"about_ca_system_score_gemma":0.0007498337,"threshold_uncertainty_score":0.99966985},"labels":[],"label_agreement":null},{"id":"W4412964113","doi":"10.1016/j.apenergy.2025.126449","title":"Incorporating financial entities into spot electricity market with renewable energy via holistic risk-aware bilevel optimization","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Science Foundation of Guangdong Province; Queen's University; National Natural Science Foundation of China; Queen's University Belfast","keywords":"Bilevel optimization; Business; Renewable energy; Electricity; Spot market; Environmental economics; Finance; Computer science; Economics; Engineering; Optimization problem; Electrical engineering","score_opus":0.004301386135943405,"score_gpt":0.17162538190238108,"score_spread":0.16732399576643767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412964113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018007305,0.00012422868,0.9241307,0.000014752255,0.00042193147,0.000078207675,0.000005978655,0.0005398934,0.07288357],"genre_scores_gemma":[0.98144144,0.00021669257,0.0144864945,0.00019334911,0.00026907303,0.00029599847,0.00013066591,0.00007807046,0.0028882022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845564,0.000038968148,0.00037808172,0.0004238948,0.00026334406,0.0004400602],"domain_scores_gemma":[0.9992192,0.000085659434,0.00011670899,0.00043261072,0.000068466135,0.000077377816],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015414924,0.00036874844,0.00033283458,0.00040498286,0.00024403706,0.00008888925,0.0002872206,0.0001578334,0.00009680572],"category_scores_gemma":[0.000025845375,0.0003799394,0.00005015403,0.0010890885,0.000059779974,0.00013662106,0.00012497802,0.00014165294,0.0000029021082],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004120578,0.000034184966,0.00013628523,0.0000634151,0.000096372314,0.00000709322,0.000020052037,0.9582925,0.00027547363,0.021258533,0.014792998,0.004981928],"study_design_scores_gemma":[0.0007053681,0.000048019367,0.0004476224,0.00005299912,0.00010506559,0.0000017678684,0.00003436724,0.94838053,0.014574227,0.010200846,0.0248689,0.00058027916],"about_ca_topic_score_codex":0.0053063533,"about_ca_topic_score_gemma":0.0032122547,"teacher_disagreement_score":0.9796407,"about_ca_system_score_codex":0.0003031244,"about_ca_system_score_gemma":0.000086722765,"threshold_uncertainty_score":0.99986523},"labels":[],"label_agreement":null},{"id":"W4413056564","doi":"10.1007/978-981-96-7036-9_13","title":"Behavior-Driven Data Augmentation for Non-Intrusive Load Monitoring","year":2025,"lang":"en","type":"book-chapter","venue":"Communications in computer and information science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science","score_opus":0.05354484732171682,"score_gpt":0.3133949376341959,"score_spread":0.2598500903124791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413056564","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019282779,0.00034508327,0.68696296,0.00022557152,0.002384202,0.0014392318,0.00017207397,0.00022527078,0.30805275],"genre_scores_gemma":[0.15759382,0.022654448,0.805006,0.0007151882,0.000676064,0.0012063005,0.004113811,0.000089325215,0.007945006],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905896,0.0000041323374,0.00040928167,0.00015932492,0.000231269,0.00013702534],"domain_scores_gemma":[0.9978399,0.000097504155,0.00008970511,0.0017304192,0.00020489628,0.00003753958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037124453,0.00014601703,0.0001414502,0.0004945755,0.00021778602,0.00022467866,0.0018114416,0.000068881694,0.0000032016737],"category_scores_gemma":[0.000018307886,0.00016999326,0.000019224131,0.0001660631,0.0001810029,0.0029810057,0.0015643575,0.00017120241,0.000011225465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055822006,0.000021237718,0.00032971113,0.00031946014,0.000051725787,3.8085506e-7,0.0020199814,0.09796257,0.000022354256,0.0994348,0.008385386,0.7914468],"study_design_scores_gemma":[0.00023075071,0.000010905499,0.0012032515,0.00020675476,0.000021190965,8.994163e-7,0.000026857922,0.82833326,0.00002206643,0.0002100184,0.16955683,0.00017723833],"about_ca_topic_score_codex":0.000008081727,"about_ca_topic_score_gemma":0.00000994565,"teacher_disagreement_score":0.79126954,"about_ca_system_score_codex":0.00031803735,"about_ca_system_score_gemma":0.00010762091,"threshold_uncertainty_score":0.6932124},"labels":[],"label_agreement":null},{"id":"W4413109701","doi":"10.1016/j.buildenv.2025.113543","title":"Energy remuneration mechanisms for renewable energy communities: Insights from a mixed-use district","year":2025,"lang":"en","type":"article","venue":"Building and Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Ministry of Science and Technology, Taiwan; Concordia University; Ministero dell'Istruzione e del Merito; Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Remuneration; Energy (signal processing); Environmental economics; Business; Natural resource economics; Environmental science; Engineering; Economics; Electrical engineering; Finance","score_opus":0.008433654937225425,"score_gpt":0.17141142023764863,"score_spread":0.1629777653004232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413109701","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040765718,0.0009775547,0.9565375,0.00005726256,0.00048886915,0.000068411704,0.000017601635,0.0001489415,0.0009381709],"genre_scores_gemma":[0.9839984,0.0020820731,0.01197241,0.00017346363,0.0000752689,0.00019419187,0.00017998795,0.000032411022,0.0012917886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927616,0.000031240685,0.00020468073,0.00018946598,0.00010654928,0.00019190043],"domain_scores_gemma":[0.99945205,0.00012896102,0.000025958234,0.00033954234,0.00000417473,0.000049281563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049766506,0.00018721966,0.00017006989,0.00010812013,0.00018299458,0.0000849492,0.00012284343,0.0000786734,0.000014242309],"category_scores_gemma":[0.0000043075765,0.00019564822,0.000044778004,0.0000668476,0.000024704115,0.00011909033,0.000114817485,0.00004573249,7.0453933e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012614691,0.00003459617,0.00003405225,0.000024032292,0.00014565239,0.0000015750642,0.000099885336,0.92355615,0.0120308045,0.04718168,0.008119072,0.008759865],"study_design_scores_gemma":[0.00050945865,0.00003692246,0.0004116835,0.00006568868,0.00006814587,3.7628195e-7,0.00019053508,0.42030433,0.034752138,0.014665568,0.5287245,0.00027065055],"about_ca_topic_score_codex":0.0034766826,"about_ca_topic_score_gemma":0.0004996596,"teacher_disagreement_score":0.94456506,"about_ca_system_score_codex":0.0001595958,"about_ca_system_score_gemma":0.0000037497375,"threshold_uncertainty_score":0.7978303},"labels":[],"label_agreement":null},{"id":"W4413147979","doi":"10.1016/j.energy.2025.137771","title":"Energy scheduling and economic assessment of a rural microgrid using two-stage stochastic framework","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Department of Science and Technology, Ministry of Science and Technology, India","keywords":"Microgrid; Stage (stratigraphy); Scheduling (production processes); Environmental economics; Computer science; Energy (signal processing); Operations research; Mathematical optimization; Reliability engineering; Economics; Environmental science; Operations management; Engineering; Renewable energy; Mathematics; Electrical engineering; Statistics; Geology","score_opus":0.00728471862434656,"score_gpt":0.25208406974027636,"score_spread":0.2447993511159298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413147979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32530126,0.0011414622,0.6703846,0.000024323848,0.001014578,0.00002853685,0.000005505134,0.000115217874,0.0019845366],"genre_scores_gemma":[0.9825698,0.00015411299,0.016764719,0.00008394885,0.0001769777,0.000019699584,0.000009337472,0.000037417794,0.00018394519],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911124,0.000025400217,0.00031394657,0.00017877846,0.000087185465,0.00028347853],"domain_scores_gemma":[0.9994814,0.00009002001,0.00005313438,0.00030059816,0.00001546873,0.000059397276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009335782,0.00020889856,0.0002795386,0.0002512677,0.00005687616,0.000043610522,0.00015691436,0.000081116246,0.000047324513],"category_scores_gemma":[0.000006512954,0.00023989326,0.000062617895,0.00015926259,0.000049237435,0.000091323105,0.00015025376,0.000103842816,7.20165e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033664355,0.000009820665,0.00024571293,0.00003462789,0.00014205775,0.0000020140062,0.000017939676,0.85592,0.0034484079,0.13765971,0.000047048998,0.002469277],"study_design_scores_gemma":[0.0003682311,0.000014499225,0.00037501013,0.0001683499,0.000048604852,0.0000019714387,0.00012834507,0.9888162,0.0041339914,0.0010752486,0.004640951,0.00022861546],"about_ca_topic_score_codex":0.0008276858,"about_ca_topic_score_gemma":0.00013014619,"teacher_disagreement_score":0.6572686,"about_ca_system_score_codex":0.00022169271,"about_ca_system_score_gemma":0.000046515954,"threshold_uncertainty_score":0.9782563},"labels":[],"label_agreement":null},{"id":"W4413210078","doi":"10.1016/j.segan.2025.101904","title":"A distributionally robust optimization strategy for virtual bidding in two-settlement electricity markets","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"Mitacs; Hydro-Québec","keywords":"Bidding; Settlement (finance); Robust optimization; Electricity; Economics; Microeconomics; Industrial organization; Business; Computer science; Operations research; Mathematical optimization; Engineering; Electrical engineering; Mathematics; Finance","score_opus":0.004654667273753046,"score_gpt":0.21035373791522308,"score_spread":0.20569907064147003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413210078","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062540835,0.001154449,0.9883253,0.00009288421,0.00033218475,0.00022022544,0.000009306931,0.0001298479,0.0034817404],"genre_scores_gemma":[0.99588895,0.00077222614,0.00064546335,0.00008945029,0.0002129397,0.000278036,0.00026644883,0.000028058765,0.001818433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986884,0.00003129434,0.0002911644,0.00027649433,0.000101584985,0.0006110415],"domain_scores_gemma":[0.99957687,0.000104459235,0.000030424197,0.00014571383,0.00008443411,0.00005813179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035796486,0.00020702681,0.00020037171,0.00024268628,0.00015141192,0.00009929454,0.0001173075,0.00008323932,0.000020868334],"category_scores_gemma":[0.000026189231,0.00022607078,0.00004402089,0.0006778682,0.000024506211,0.0001592956,0.00008792021,0.00011920147,7.95011e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048512928,0.00002261259,0.00028134434,0.000049158563,0.000052673964,0.000009047931,0.0000032826733,0.8337049,0.0000020231314,0.15667175,0.0046691145,0.004485593],"study_design_scores_gemma":[0.00091141247,0.000043768934,0.0012854891,0.000036081907,0.000023673736,5.0346085e-7,0.00019546568,0.98338175,0.00004105746,0.0009750643,0.012889239,0.00021646898],"about_ca_topic_score_codex":0.00010097264,"about_ca_topic_score_gemma":0.0001203722,"teacher_disagreement_score":0.9896349,"about_ca_system_score_codex":0.0004192655,"about_ca_system_score_gemma":0.000048694932,"threshold_uncertainty_score":0.9218899},"labels":[],"label_agreement":null},{"id":"W4413295305","doi":"10.1016/j.energy.2025.137976","title":"Enhancing fairness and efficiency in community energy systems: A forecast-driven approach","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Environmental economics; Efficient energy use; Energy (signal processing); Business; Computer science; Environmental science; Economics; Engineering; Mathematics; Statistics","score_opus":0.007769539734633219,"score_gpt":0.19257514639087964,"score_spread":0.18480560665624643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413295305","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21567054,0.002224578,0.6838745,0.00002122206,0.0010479063,0.00009473751,0.0000026884868,0.0004331044,0.09663076],"genre_scores_gemma":[0.99838763,0.00012831054,0.0003666204,0.00005393542,0.000056181838,0.00013760847,0.000016540931,0.000027806751,0.00082538015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989461,0.00013912772,0.00028529827,0.00018990313,0.000120947276,0.00031864573],"domain_scores_gemma":[0.9994165,0.000097605574,0.000024090306,0.0003919752,0.000019176516,0.000050663115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023006176,0.00019761825,0.0002616715,0.00034119064,0.00010401332,0.00005531413,0.00025879493,0.0000938231,0.0000032302687],"category_scores_gemma":[0.000018319208,0.00020893518,0.00003222502,0.00051686633,0.000039606344,0.000095673306,0.00019510638,0.00016763323,8.411014e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038711128,0.000052765878,0.00025681293,0.00020335472,0.00004141035,0.0000050342837,0.00025321345,0.93649447,0.0003075893,0.05898808,0.00038830214,0.0030051046],"study_design_scores_gemma":[0.0004902341,0.00002274758,0.00095559756,0.00018423668,0.00001598445,0.0000044750645,0.0011236575,0.976445,0.0020554466,0.000250582,0.01816954,0.00028245238],"about_ca_topic_score_codex":0.0033216008,"about_ca_topic_score_gemma":0.002137209,"teacher_disagreement_score":0.78271705,"about_ca_system_score_codex":0.00015607706,"about_ca_system_score_gemma":0.000015567211,"threshold_uncertainty_score":0.85201293},"labels":[],"label_agreement":null},{"id":"W4413359292","doi":"10.1109/tsg.2025.3600714","title":"A Hybrid Imitation–Reinforcement Learning Framework for Optimal Operation of Soft Open Points in Unbalanced Distribution Networks","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reinforcement learning; Imitation; Computer science; Reinforcement; Artificial intelligence; Control theory (sociology); Mathematical optimization; Engineering; Mathematics; Structural engineering; Control (management); Psychology","score_opus":0.011150811118158164,"score_gpt":0.25081233727835095,"score_spread":0.2396615261601928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413359292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0140537005,0.000024739475,0.9824342,0.00017467038,0.0020201257,0.00080333336,0.000031345066,0.00012760196,0.00033028127],"genre_scores_gemma":[0.9929101,0.00005679763,0.0058544483,0.00007906225,0.00006688034,0.00062175875,0.00018548132,0.000026630882,0.00019887432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883723,0.000040096802,0.00046180005,0.00024350121,0.00014085304,0.0002765056],"domain_scores_gemma":[0.99943817,0.00016771155,0.00005303011,0.00023376023,0.000066367655,0.00004097845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029084322,0.00018973564,0.00025442278,0.00018220523,0.00014067686,0.00007258689,0.00022665544,0.000088544715,0.000043181157],"category_scores_gemma":[0.000021292446,0.00021943181,0.00008860088,0.00034058213,0.000025549802,0.00027342484,0.0000055506534,0.0002840035,0.000006984037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001282262,0.00006117642,0.000064411346,0.000060281953,0.0000930785,7.666785e-7,0.000073272815,0.99280167,0.00009435634,0.0014476668,0.0007796488,0.0043954235],"study_design_scores_gemma":[0.0010648973,0.000109172935,0.000619141,0.00020006404,0.000045530527,5.276314e-7,0.00007723294,0.9842466,0.010270331,0.0001799774,0.0029944591,0.00019203937],"about_ca_topic_score_codex":0.000043678272,"about_ca_topic_score_gemma":0.00004613676,"teacher_disagreement_score":0.9788564,"about_ca_system_score_codex":0.0002680059,"about_ca_system_score_gemma":0.000030829564,"threshold_uncertainty_score":0.89481694},"labels":[],"label_agreement":null},{"id":"W4413365057","doi":"10.1016/j.enbuild.2025.116327","title":"Building bridges: Unlocking cost savings through peer-to-peer trading between heat prosumers","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Social Sciences and Humanities Research Council of Canada; Natural Sciences and Engineering Research Council of Canada; Canadian Institutes of Health Research; Alliance de recherche numérique du Canada","keywords":"Peer-to-peer; Business; Environmental economics; Industrial organization; Computer science; Economics; Computer network","score_opus":0.011840994540209579,"score_gpt":0.24359902841113842,"score_spread":0.23175803387092886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413365057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64848864,0.0006470968,0.33442813,0.002936598,0.001406808,0.00025114184,0.000010926604,0.0009112979,0.010919365],"genre_scores_gemma":[0.98699576,0.00009629905,0.009087985,0.00082526053,0.00042601847,0.000086908076,0.000019590118,0.0000811249,0.0023810565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978466,0.000026325206,0.00041029378,0.0005709679,0.0004423683,0.0007034191],"domain_scores_gemma":[0.99925166,0.00014039161,0.000032065458,0.0003250799,0.00008878553,0.00016200349],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041493544,0.00041730102,0.0004263537,0.00035667807,0.0003099812,0.00023500026,0.00035803622,0.0001662848,0.000021740569],"category_scores_gemma":[0.00009644055,0.0004545332,0.00010038722,0.0007503689,0.000065653534,0.0004004851,0.00022578289,0.00023489138,0.000004079034],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048924798,0.00005949863,0.0369236,0.00044419852,0.001012442,0.00005491656,0.0020148426,0.46930245,0.024095822,0.26743802,0.11759174,0.081013545],"study_design_scores_gemma":[0.0005613579,0.000034994056,0.0058684875,0.00041082088,0.00011453189,0.0000059691115,0.00017668706,0.012786151,0.04675034,0.0012658681,0.9313641,0.0006606511],"about_ca_topic_score_codex":0.0005047581,"about_ca_topic_score_gemma":0.000035347184,"teacher_disagreement_score":0.8137724,"about_ca_system_score_codex":0.00027906592,"about_ca_system_score_gemma":0.000018425138,"threshold_uncertainty_score":0.99979067},"labels":[],"label_agreement":null},{"id":"W441340","doi":"10.15173/esr.v14i2.494","title":"The Economics of Energy Storage in 14 Deregulated Power Markets","year":2006,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Investment (military); Energy storage; Revenue; Economics; Business; Microeconomics; Monetary economics; Power (physics); Finance","score_opus":0.008632538506956585,"score_gpt":0.20558209658094168,"score_spread":0.1969495580739851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W441340","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074683637,0.94237196,0.0003610524,0.00043204502,0.0010527468,0.00010471469,0.000003200278,0.000119737495,0.04808616],"genre_scores_gemma":[0.3313993,0.6664724,0.00007496515,0.00023672302,0.000076341945,0.00010287763,0.000010334018,0.000042758413,0.0015843158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99877495,0.0000774401,0.00057643536,0.00018392062,0.0001013803,0.0002858516],"domain_scores_gemma":[0.9992861,0.00013604028,0.000088650624,0.0004204502,0.000045145338,0.000023570605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031154492,0.00022171407,0.00048301002,0.000069098256,0.000057318583,0.000009497294,0.00023074252,0.00003986172,0.000032415664],"category_scores_gemma":[0.000031628682,0.00016925237,0.00010702934,0.0002707445,0.00007196936,0.000057861387,0.00012625128,0.00005573053,0.000003443841],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021636573,0.000079387515,0.00033201548,0.0018434491,0.001144298,0.00003285727,0.000045618017,0.53201556,0.000022001968,0.1426263,0.25966322,0.062173676],"study_design_scores_gemma":[0.00019765618,0.0000134655165,0.0024564192,0.0005698806,0.00003948956,0.0000018189373,0.000022758968,0.001932243,0.00014634566,0.0005049264,0.99389803,0.00021695525],"about_ca_topic_score_codex":0.00008855114,"about_ca_topic_score_gemma":0.0014814663,"teacher_disagreement_score":0.7342348,"about_ca_system_score_codex":0.00015503101,"about_ca_system_score_gemma":0.000008140623,"threshold_uncertainty_score":0.69019115},"labels":[],"label_agreement":null},{"id":"W4413468435","doi":"10.1109/icjece.2025.3592219","title":"HEES-Based IFVR for Energy-Saving Application Using DC–DC Converter","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Materials science","score_opus":0.0045311487371022295,"score_gpt":0.1703015567416404,"score_spread":0.16577040800453818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413468435","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017416079,0.00072822085,0.9810298,0.00008051248,0.0005728601,0.00006177788,0.0000012329076,0.000035617653,0.00007392024],"genre_scores_gemma":[0.9900007,0.000010635619,0.009395556,0.00023053867,0.0003191469,0.000007782129,0.0000022327306,0.000022335,0.000011055476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992828,0.0000061760957,0.00025109635,0.000104989274,0.000062884625,0.00029204896],"domain_scores_gemma":[0.99952364,0.00008206899,0.000029678673,0.00008872074,0.00005865036,0.00021726116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008697751,0.00013636811,0.00019244563,0.00045812168,0.00005343422,0.00006454938,0.0001349985,0.000058329726,0.0000025928189],"category_scores_gemma":[0.000011578338,0.00014441887,0.000069737536,0.00029114887,0.000009460016,0.00007725294,0.0000077824325,0.00012263688,1.9600046e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003885868,0.0000041525923,0.00041989953,0.00006662609,0.00009385384,0.000012234093,0.000011068281,0.9555988,0.001039269,0.005029115,0.0008851968,0.036835898],"study_design_scores_gemma":[0.0003049133,0.000035877263,0.00079959724,0.000056273027,0.0000325803,0.000013972375,9.110296e-7,0.9611905,0.000765215,0.00007902412,0.03658625,0.00013488541],"about_ca_topic_score_codex":0.00014300531,"about_ca_topic_score_gemma":0.00011746044,"teacher_disagreement_score":0.97258466,"about_ca_system_score_codex":0.00022283256,"about_ca_system_score_gemma":0.000108975866,"threshold_uncertainty_score":0.5889231},"labels":[],"label_agreement":null},{"id":"W4413472467","doi":"10.1109/tii.2025.3593846","title":"An Event-Driven Neural Kalman Model for State Representation and Learning-Based Dynamic Scheduling of Industrial Energy System","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"National Natural Science Foundation of China","keywords":"Kalman filter; Computer science; Scheduling (production processes); Representation (politics); Artificial neural network; Artificial intelligence; Control engineering; Machine learning; Real-time computing; Engineering","score_opus":0.029346158353718527,"score_gpt":0.2599733360911052,"score_spread":0.23062717773738664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413472467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19890101,0.0000040815903,0.79927593,0.000021151516,0.00113583,0.00032703165,0.00005041467,0.00021693674,0.00006760611],"genre_scores_gemma":[0.9977995,0.0000091576985,0.0018440426,0.000021203072,0.000047682424,0.000119197546,0.000044062894,0.000027444452,0.000087721055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864167,0.000059023,0.00074812566,0.00012434922,0.00019468607,0.00023214096],"domain_scores_gemma":[0.99931496,0.00013960055,0.00014321308,0.00025234622,0.00007324742,0.00007661567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022841805,0.00020564786,0.00028005813,0.00045810718,0.00016754851,0.000065224616,0.00014713111,0.00022134103,0.000002237436],"category_scores_gemma":[0.000014042676,0.00022905033,0.00009091239,0.00036170884,0.000039278075,0.0003788798,0.0000022092402,0.00040117517,5.869365e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013950055,0.00003111274,0.000015522846,0.00011103746,0.000112869566,2.8917526e-7,0.00026570456,0.983365,0.00014148699,0.00009552106,0.00006122818,0.015660752],"study_design_scores_gemma":[0.0024496317,0.00015358691,0.0000025227919,0.00015238329,0.00011269342,6.7569397e-7,0.0007204858,0.9896634,0.006474317,0.000012915021,0.00008522864,0.00017215441],"about_ca_topic_score_codex":0.000057163485,"about_ca_topic_score_gemma":0.00004798238,"teacher_disagreement_score":0.79889846,"about_ca_system_score_codex":0.0002006704,"about_ca_system_score_gemma":0.00007908296,"threshold_uncertainty_score":0.9340401},"labels":[],"label_agreement":null},{"id":"W4413844505","doi":"10.1016/j.epsr.2025.112091","title":"Multi-modal multi-task artificial intelligence model for active distribution network scheduling with multi-agent reinforcement learning","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada; Sultan Qaboos University; His Majesty’s Trust Fund","keywords":"Reinforcement learning; Computer science; Artificial intelligence; Modal; Task (project management); Scheduling (production processes); Machine learning; Engineering; Systems engineering","score_opus":0.05781805628729088,"score_gpt":0.3271675777636495,"score_spread":0.26934952147635866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413844505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009963906,0.0010164964,0.98559487,0.000040339768,0.000776304,0.002036954,0.000009551744,0.00035607454,0.00020549522],"genre_scores_gemma":[0.9892204,0.00011192136,0.0067523024,0.000007986251,0.0001426429,0.00132972,0.00009968073,0.00007242356,0.0022629197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962848,0.0002135751,0.0006358176,0.00062470016,0.0007496306,0.0014914856],"domain_scores_gemma":[0.9985363,0.00024389122,0.000082602,0.00046618286,0.0005021076,0.000168923],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018991237,0.0003581387,0.00039442664,0.0004752486,0.0006109528,0.00022954759,0.0004657263,0.00018812073,0.0000051014276],"category_scores_gemma":[0.0003109789,0.00034484937,0.000103408325,0.0018041923,0.000059478927,0.00020000919,0.00017075209,0.00094117917,0.000036241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001745894,0.00009821662,0.000067366585,0.000201322,0.0002910785,0.000007134446,0.00030113728,0.9918531,0.0019497039,0.0019815387,0.0004746413,0.002600133],"study_design_scores_gemma":[0.00052506156,0.00017340202,0.0001668802,0.00023434336,0.0000275288,0.0000017117804,0.00042204146,0.9932447,0.0028666286,0.000018863548,0.0019849238,0.00033387932],"about_ca_topic_score_codex":0.00019696639,"about_ca_topic_score_gemma":0.00008230361,"teacher_disagreement_score":0.9792565,"about_ca_system_score_codex":0.0015774324,"about_ca_system_score_gemma":0.00019760663,"threshold_uncertainty_score":0.99990034},"labels":[],"label_agreement":null},{"id":"W4413872150","doi":"10.5267/j.ijiec.2025.6.002","title":"Switch-off policies in job-shop systems including energy price variabilit","year":2025,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Job shop; Environmental economics; Business; Economics; Computer science; Labour economics; Industrial organization; Mathematics; Statistics; Flow shop scheduling; Embedded system; Job shop scheduling","score_opus":0.02159059099406922,"score_gpt":0.2553796295431288,"score_spread":0.2337890385490596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413872150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22646183,0.0008778511,0.74116164,0.0012442465,0.023918038,0.0001750776,0.000013374838,0.00024879986,0.005899147],"genre_scores_gemma":[0.99773157,0.00007698367,0.0009277851,0.0000369501,0.0010964563,0.000012893953,0.000006202825,0.000024503355,0.000086642685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984521,0.000031626496,0.000824021,0.00011167849,0.00037139773,0.00020913742],"domain_scores_gemma":[0.99908006,0.00036359538,0.0001164751,0.00011261086,0.0002625749,0.00006470844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037305435,0.00017437864,0.00026353946,0.0013264562,0.000029201901,0.00013960633,0.00048765214,0.00011293789,0.000009118372],"category_scores_gemma":[0.0003075479,0.00019138893,0.0000896669,0.0006401292,0.000014212173,0.00025714454,0.0001006653,0.00035670842,0.0000019987924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000973964,0.000026952803,0.0009050763,0.0000121700305,0.00030169295,0.000025999643,0.000093174494,0.9692334,0.00032169372,0.025251744,0.0018938541,0.0019245353],"study_design_scores_gemma":[0.0011921738,0.000022462049,0.0018853497,0.00055183563,0.000027960512,0.00003621123,0.00011280762,0.95630515,0.00024796638,0.00025297416,0.039172765,0.00019234933],"about_ca_topic_score_codex":0.000101258716,"about_ca_topic_score_gemma":0.000007502326,"teacher_disagreement_score":0.77126974,"about_ca_system_score_codex":0.0007304009,"about_ca_system_score_gemma":0.00010148063,"threshold_uncertainty_score":0.78046143},"labels":[],"label_agreement":null},{"id":"W4413908657","doi":"10.3390/en18174622","title":"Real-Time Energy Management of a Microgrid Using MPC-DDQN-Controlled V2H and H2V Operations with Renewable Energy Integration","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Egg Farmers of Canada","keywords":"Microgrid; Renewable energy; Energy management; Computer science; Intermittent energy source; Energy (signal processing); Distributed generation; Engineering; Electrical engineering; Mathematics","score_opus":0.00398755118681473,"score_gpt":0.1911978517370053,"score_spread":0.18721030055019056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413908657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67915815,0.0038749308,0.2010838,0.0002332785,0.00095889455,0.00043009783,0.000016498823,0.00097109255,0.11327327],"genre_scores_gemma":[0.9521557,0.0037580451,0.030500976,0.00006564514,0.00009911125,0.00022185553,0.00006257529,0.00006528165,0.0130707845],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890196,0.000042397136,0.00036951626,0.00026992286,0.00016445662,0.00025176263],"domain_scores_gemma":[0.9994533,0.000039766925,0.00004379943,0.00035562346,0.00006510649,0.000042387586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010911836,0.0002603906,0.00039371755,0.0003371903,0.00010828841,0.000083363746,0.00015264255,0.00006706905,0.000034254626],"category_scores_gemma":[0.0000043890836,0.00022882767,0.00006009699,0.000429183,0.000063970394,0.00019555485,0.000104368904,0.00004234799,7.7521435e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007102108,0.000028377162,0.000024436631,0.000060082395,0.00049987255,0.0000081538,0.000052566313,0.9306345,0.035470404,0.029054092,0.0019058591,0.0021906192],"study_design_scores_gemma":[0.0038096427,0.00007748996,0.00039136512,0.0005020408,0.00045050296,0.000005546103,0.00055778015,0.80520564,0.16675654,0.00039371883,0.021323182,0.0005265558],"about_ca_topic_score_codex":0.0032431292,"about_ca_topic_score_gemma":0.0010484452,"teacher_disagreement_score":0.2729976,"about_ca_system_score_codex":0.00010537826,"about_ca_system_score_gemma":0.000024689165,"threshold_uncertainty_score":0.9331322},"labels":[],"label_agreement":null},{"id":"W4413950493","doi":"10.3390/ai6090213","title":"A Survey of Traditional and Emerging Deep Learning Techniques for Non-Intrusive Load Monitoring","year":2025,"lang":"en","type":"article","venue":"AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Deep learning; Computer science; Data science; Environmental science; Artificial intelligence","score_opus":0.013268313564776568,"score_gpt":0.24541749410170113,"score_spread":0.23214918053692457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413950493","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47778374,0.0008969261,0.51113373,0.00016021455,0.0012669056,0.00042899026,0.000013845018,0.00048139278,0.007834264],"genre_scores_gemma":[0.9967406,0.00007030168,0.0029307588,0.000013850726,0.00007620266,0.00006145794,0.000008961026,0.000012672408,0.00008519306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996104,0.000009997231,0.000116056115,0.000089870366,0.00006775079,0.000105872365],"domain_scores_gemma":[0.99972934,0.00011848481,0.000014957246,0.00006495594,0.000057126133,0.0000151202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018073569,0.00006975019,0.00010143133,0.00008314542,0.000039287606,0.000011986288,0.00005189666,0.000029485887,0.000004456814],"category_scores_gemma":[0.00006291847,0.00008054572,0.000020324342,0.00012000253,0.000013091902,0.00006023688,0.00001897686,0.0000683285,4.362871e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008448674,0.00010516484,0.24592018,0.0017009166,0.0010291068,0.000009131171,0.0015780024,0.4033335,0.035046354,0.007317454,0.008565761,0.29530996],"study_design_scores_gemma":[0.0006432055,0.000109867105,0.5839713,0.00034757244,0.00005976162,0.0000010626493,0.00019835735,0.24862824,0.15243362,0.0009366909,0.0123057235,0.0003645908],"about_ca_topic_score_codex":0.00008172499,"about_ca_topic_score_gemma":0.000026661906,"teacher_disagreement_score":0.51895684,"about_ca_system_score_codex":0.00005074285,"about_ca_system_score_gemma":0.000008407339,"threshold_uncertainty_score":0.3284559},"labels":[],"label_agreement":null},{"id":"W4414008109","doi":"10.1109/tcsi.2025.3600455","title":"Offline Deep Reinforcement Learning-Based Home Energy Management Systems With Heterogeneous EV Charging Load Models","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Circuits and Systems I Regular Papers","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Natural Science Foundation of China","keywords":"Reinforcement learning; Computer science; Reinforcement; Load management; Energy management; Energy (signal processing); Electrical engineering; Electronic engineering; Engineering; Artificial intelligence; Mathematics","score_opus":0.00749697721389709,"score_gpt":0.1754276229158393,"score_spread":0.16793064570194222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414008109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002919416,0.0018251664,0.9812633,0.000034632605,0.0016147322,0.0005759371,0.000004275772,0.0005516013,0.011210935],"genre_scores_gemma":[0.9933695,0.00053988775,0.000023274557,0.00008020822,0.000054098226,0.00049524277,0.000011101368,0.00008053153,0.005346134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997832,0.000087458066,0.00050512917,0.00051096105,0.0005619573,0.0005024964],"domain_scores_gemma":[0.9990925,0.000042330652,0.000073349205,0.00053932687,0.000072018214,0.00018044576],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025574106,0.00044432748,0.00046022065,0.0004416461,0.00030084603,0.00017939461,0.00019480268,0.00013129938,0.00001324595],"category_scores_gemma":[8.1704195e-7,0.00041482376,0.00011373604,0.00039742774,0.000053274533,0.00012303285,0.0000024648766,0.0001945966,0.0000056713725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023518589,0.000035622616,0.000004155339,0.0008318591,0.00078315515,0.000049188537,0.0000843686,0.99131536,0.0003763737,0.0016483503,0.000053238313,0.0047947774],"study_design_scores_gemma":[0.001275661,0.00012826134,0.000008536936,0.0006636724,0.00020386794,0.00002193401,0.00029525146,0.98503655,0.00089419755,0.000004857874,0.011015286,0.0004519412],"about_ca_topic_score_codex":0.00018239213,"about_ca_topic_score_gemma":0.000060011997,"teacher_disagreement_score":0.9904501,"about_ca_system_score_codex":0.0004986371,"about_ca_system_score_gemma":0.000035850808,"threshold_uncertainty_score":0.99983037},"labels":[],"label_agreement":null},{"id":"W4414008130","doi":"10.1109/access.2025.3606499","title":"Integrating Device-Level Flexibility in Home Energy Management Systems for Prosumers","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Qassim University","keywords":"Flexibility (engineering); Computer science; Energy management; Risk analysis (engineering); Energy (signal processing); Business","score_opus":0.040625160796627896,"score_gpt":0.2935481744525463,"score_spread":0.2529230136559184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414008130","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18554176,0.001145666,0.76358545,0.00013185722,0.008878443,0.001482168,0.000026108159,0.0007816773,0.038426843],"genre_scores_gemma":[0.99622715,0.00009199489,0.0009674052,0.00011299735,0.00009877748,0.0011655466,0.000015126424,0.00003392306,0.0012870779],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871874,0.00002722669,0.000410343,0.00033544865,0.00014418914,0.00036403188],"domain_scores_gemma":[0.999406,0.00007127278,0.000036217723,0.00040877846,0.000039767656,0.000037962494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031211096,0.00020952302,0.00024994265,0.00034480754,0.000051274557,0.00017235277,0.0005413598,0.00006948074,0.000004934348],"category_scores_gemma":[0.000012884632,0.00021256378,0.000059198734,0.0005757512,0.000018306762,0.00028837193,0.000117030235,0.00008943276,0.0000031553443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023514218,0.000049720984,0.005212082,0.0018067749,0.00021489809,0.000010065103,0.000057630998,0.9376096,0.00011742147,0.025988402,0.009652814,0.019257078],"study_design_scores_gemma":[0.001795303,0.000026976242,0.02448482,0.000816929,0.000093564006,8.6910364e-7,0.00041015274,0.8783565,0.0052539157,0.0024264378,0.085563116,0.00077138183],"about_ca_topic_score_codex":0.00047960077,"about_ca_topic_score_gemma":0.00073864375,"teacher_disagreement_score":0.8106854,"about_ca_system_score_codex":0.00035205644,"about_ca_system_score_gemma":0.000013069382,"threshold_uncertainty_score":0.8668099},"labels":[],"label_agreement":null},{"id":"W4414054176","doi":"10.1109/access.2025.3607516","title":"Optimal Photovoltaic Energy Allocation in Residential Renewable Energy Communities","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HORIZON EUROPE Framework Programme; Ontario Ministry of Research and Innovation; Ontario Ministry of Research, Innovation and Science; European Commission; Ministerio de Ciencia, Innovación y Universidades","keywords":"Renewable energy; Software deployment; Remuneration; Photovoltaic system; Linear programming; Energy consumption; Production (economics); Electricity","score_opus":0.014146548760323525,"score_gpt":0.24564081915705152,"score_spread":0.23149427039672799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414054176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.539657,0.0012446505,0.3489016,0.00017421157,0.005672074,0.00016611145,0.0000065687514,0.00096404034,0.103213735],"genre_scores_gemma":[0.9960532,0.00043767513,0.00018324848,0.00025451384,0.00013537245,0.00014864594,0.00003633186,0.00003034029,0.00272067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990721,0.000053015636,0.00028786433,0.00014728645,0.0001524439,0.00028728784],"domain_scores_gemma":[0.9994,0.000057817004,0.000027340262,0.00044616772,0.00003623804,0.0000323965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011601441,0.00016993644,0.00018018497,0.0004623957,0.0000714292,0.00016070409,0.0006269449,0.00008567882,0.00007170551],"category_scores_gemma":[0.0000059031804,0.00020300486,0.00004014849,0.00056561286,0.000034269888,0.00044054308,0.00015561377,0.000093229464,0.0000038092787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012804916,0.000022415486,0.0005349534,0.000038376027,0.000048174003,0.0000073733286,0.00006299418,0.9541671,0.0026219308,0.00096188014,0.041044407,0.00047753658],"study_design_scores_gemma":[0.0007753524,0.000016427686,0.0033962494,0.00016043146,0.000033078624,0.0000014486595,0.00023180456,0.6226139,0.27568746,0.0012975303,0.095367774,0.00041852664],"about_ca_topic_score_codex":0.055207975,"about_ca_topic_score_gemma":0.054327346,"teacher_disagreement_score":0.4563962,"about_ca_system_score_codex":0.00017212708,"about_ca_system_score_gemma":0.000028929046,"threshold_uncertainty_score":0.9629287},"labels":[],"label_agreement":null},{"id":"W4414155903","doi":"10.63095/nbseh.25.546902","title":"Investigating Potential New Load Patterns on Distribution Transformers from Residential Electrification","year":2025,"lang":"en","type":"article","venue":"Natural Built Social Environment Health","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"","keywords":"Electrification; Transformer; Electricity; Grid; Distribution transformer; Electricity demand; Water heating; Electric vehicle; Electrocution","score_opus":0.007974585205198463,"score_gpt":0.2346235890809817,"score_spread":0.2266490038757832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414155903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78626734,0.0011076357,0.19498563,0.013001783,0.0026677945,0.0007786115,0.00015367618,0.00053727353,0.00050025026],"genre_scores_gemma":[0.9970536,0.00048712062,0.0002192408,0.00063258014,0.0005960097,0.000021519796,0.0007235299,0.00002579476,0.0002405707],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99829125,0.00008502073,0.0003820902,0.00032769112,0.0004839118,0.00043001486],"domain_scores_gemma":[0.9996149,0.00003299678,0.00007339538,0.00015889113,0.0000071180257,0.00011269077],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020727467,0.00022442757,0.00021591585,0.0000629649,0.0002959782,0.000046274552,0.00016870208,0.00013547804,0.00006170794],"category_scores_gemma":[0.00001890322,0.0002541004,0.00009747097,0.00016361229,0.00003411836,0.00012475539,0.00001925504,0.0004346175,0.000040418792],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018335978,0.00022842265,0.005513112,0.00044189114,0.00072819,0.000008921239,0.0019186372,0.24029769,0.047752302,0.0066276686,0.13905078,0.557249],"study_design_scores_gemma":[0.002706251,0.00013361567,0.9111247,0.00018766125,0.00012162168,5.5573884e-7,0.00024121524,0.036192402,0.016534222,0.0020194994,0.029890591,0.0008476448],"about_ca_topic_score_codex":0.0018298351,"about_ca_topic_score_gemma":0.00014360114,"teacher_disagreement_score":0.90561163,"about_ca_system_score_codex":0.002056991,"about_ca_system_score_gemma":0.00010306218,"threshold_uncertainty_score":0.9999911},"labels":[],"label_agreement":null},{"id":"W4414298134","doi":"10.1016/j.ecmx.2025.101249","title":"Pricing and trading strategies in networked microgrid systems: A comprehensive review","year":2025,"lang":"en","type":"review","venue":"Energy Conversion and Management X","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"EPCOR; Natural Sciences and Engineering Research Council of Canada; AltaLink; Alberta Electric System Operator","keywords":"Microgrid; Key (lock); Scalability; Task (project management); Pricing strategies; Dynamic pricing","score_opus":0.015474317374713166,"score_gpt":0.24080050899445676,"score_spread":0.2253261916197436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414298134","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000014949243,0.9870151,0.00069097657,0.00001512527,0.00093925814,0.0006758317,0.0000022502763,0.00018239258,0.010477545],"genre_scores_gemma":[0.000015648453,0.9987108,0.000103597966,0.00016583968,0.00006516786,0.00020738668,0.00006953666,0.000042380354,0.00061964226],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983733,0.00012207059,0.00055767957,0.00046241278,0.00014918452,0.00033531495],"domain_scores_gemma":[0.9993828,0.00013025096,0.000101550184,0.00029985397,0.000010934427,0.000074622476],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017207737,0.00049927033,0.0012889155,0.00055038615,0.00006198043,0.00011884864,0.00020067568,0.00012886911,0.000014499296],"category_scores_gemma":[0.000002747269,0.00047542914,0.00011759873,0.00052741554,0.000035525132,0.0001300639,0.00028839498,0.00017515909,0.0000030922695],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013733048,0.0000080259015,4.5450668e-7,0.3471851,0.00036539196,0.00008805558,0.000011688405,0.0019849264,5.635913e-8,0.006113019,0.018132012,0.6261099],"study_design_scores_gemma":[0.00022869956,0.0000087205435,0.000001705231,0.09542766,0.00057941687,0.0000064238125,0.00013742653,0.004503875,7.778283e-8,0.000006955978,0.8987419,0.0003571108],"about_ca_topic_score_codex":0.000050782644,"about_ca_topic_score_gemma":0.000008107918,"teacher_disagreement_score":0.8806099,"about_ca_system_score_codex":0.0001416893,"about_ca_system_score_gemma":0.0000161448,"threshold_uncertainty_score":0.99976975},"labels":[],"label_agreement":null},{"id":"W4414301636","doi":"10.1016/j.ifacol.2025.08.125","title":"Operational management of multiple energy communities in the energy market: a bilevel optimization-based approach","year":2025,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Commission for Environmental Cooperation","keywords":"Renewable energy; Bilevel optimization; Distributed generation; Key (lock); Grid; Sustainability; Smart grid; Profitability index; Energy management","score_opus":0.011202731329830896,"score_gpt":0.20101248375003913,"score_spread":0.18980975242020823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414301636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027568513,0.00067416986,0.91701245,0.00054873445,0.0003105836,0.00022530924,0.000057190904,0.00015764221,0.07825705],"genre_scores_gemma":[0.6780433,0.0002971346,0.31837347,0.0008872334,0.000059322596,0.00032647088,0.00060670223,0.000035587862,0.0013707655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988613,0.00011517133,0.00037398204,0.0001611555,0.00025777792,0.00023058869],"domain_scores_gemma":[0.9992194,0.00020578085,0.000035980564,0.00047166608,0.000043489737,0.000023654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026627575,0.00021298947,0.00021247928,0.0002731959,0.000083721956,0.000037345868,0.00047799712,0.00006607205,0.00014327637],"category_scores_gemma":[0.0000092896535,0.00018037648,0.00006995179,0.0005623749,0.00006593797,0.00007762298,0.00008322127,0.000098847144,6.7513173e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022674576,0.00017372184,0.00045256838,0.00013218315,0.00013742922,0.000004591858,0.00015069522,0.98543584,0.000018614295,0.011769455,0.00028031616,0.0014219246],"study_design_scores_gemma":[0.00087933155,0.000012836071,0.0013373122,0.00008338806,0.000030879663,6.959393e-7,0.0012640983,0.9894707,0.0001320238,0.000027674212,0.0065949596,0.0001660946],"about_ca_topic_score_codex":0.0006447646,"about_ca_topic_score_gemma":0.00034657342,"teacher_disagreement_score":0.6752865,"about_ca_system_score_codex":0.00009005742,"about_ca_system_score_gemma":0.00002342276,"threshold_uncertainty_score":0.7355539},"labels":[],"label_agreement":null},{"id":"W4414305174","doi":"10.1016/j.epsr.2026.113109","title":"Chance Constrained Models for the Operation of Electric Storage in Energy and Reserve Markets with Uncertainty in Wind Power","year":2025,"lang":"en","type":"preprint","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wind power; Context (archaeology); Energy storage; Range (aeronautics); Wind speed; Mode (computer interface); Pumped-storage hydroelectricity; Power (physics); Electric power system","score_opus":0.025799515618593876,"score_gpt":0.27644155799108877,"score_spread":0.2506420423724949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414305174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54492456,0.10925489,0.29340097,0.00086774735,0.0026528467,0.014798708,0.0001880398,0.00035313313,0.033559114],"genre_scores_gemma":[0.99568707,0.0018544464,0.00004115799,0.000008632377,0.000047201152,0.0013179675,0.000022909871,0.00005139249,0.00096924644],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99637365,0.0005829229,0.00067206763,0.00066009973,0.0008210464,0.0008902117],"domain_scores_gemma":[0.99783504,0.0008751855,0.00009201078,0.00078475283,0.00034069843,0.000072324765],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0038402001,0.00035945087,0.0006342965,0.0019061475,0.00008550585,0.00013597208,0.0006788509,0.00032480765,0.0000067950155],"category_scores_gemma":[0.00014452041,0.00029000925,0.00005742394,0.002057612,0.00006689898,0.00012385186,0.00029744286,0.0009434947,3.3239746e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027513498,0.00004575711,0.00008666586,0.0006747992,0.00020799754,0.000018576116,0.00031904117,0.9921113,0.00035866862,0.0042867167,0.0011589251,0.00045636707],"study_design_scores_gemma":[0.0009149292,0.00017333905,0.0008745363,0.000618145,0.000013267459,0.0000042097085,0.00014725405,0.9951734,0.00034856342,0.00026735416,0.0011933197,0.00027168493],"about_ca_topic_score_codex":0.0033825873,"about_ca_topic_score_gemma":0.0011763544,"teacher_disagreement_score":0.45076248,"about_ca_system_score_codex":0.0009061157,"about_ca_system_score_gemma":0.00048644783,"threshold_uncertainty_score":0.9999552},"labels":[],"label_agreement":null},{"id":"W4414308733","doi":"10.1115/es2025-156635","title":"The Economic Dispatch of Power-to-Gas Systems With Deep Reinforcement Learning: Tackling the Challenge of Delayed Rewards With Long-Term Energy Storage","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Siemens (Canada); McGill University","funders":"","keywords":"Economic dispatch; Electricity; Energy storage; Renewable energy; Reinforcement learning; Electric power system; Wind power; Energy (signal processing)","score_opus":0.004022554718895172,"score_gpt":0.19010140280716445,"score_spread":0.18607884808826927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414308733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40916207,0.0013372262,0.5299557,0.00042602624,0.00083343714,0.00064009725,0.0000015484895,0.00024391491,0.05739999],"genre_scores_gemma":[0.9971768,0.00038051055,0.00007668749,0.000020435831,0.00004094561,0.0001153556,0.0000054115717,0.000042483945,0.0021413665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987521,0.000038042766,0.0004374707,0.0002215954,0.00023596441,0.00031481177],"domain_scores_gemma":[0.9989588,0.000120045195,0.000119575285,0.0006868265,0.00006111625,0.000053632408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033041748,0.00023864993,0.00029876025,0.00011715275,0.00011791387,0.00004468097,0.0004296777,0.000048838036,0.000025671901],"category_scores_gemma":[0.000007580641,0.0001305414,0.000054825723,0.0001929151,0.00006475499,0.00006869783,0.00013631891,0.0001346738,0.000003504678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087620945,0.000008675418,0.00085073564,0.00010563113,0.00059052696,0.0000036230533,0.00029660977,0.97577477,0.000026257248,0.021505717,0.0001880046,0.0005618141],"study_design_scores_gemma":[0.0010260212,0.0008048016,0.0024297603,0.00040759885,0.00017252786,0.000003918106,0.0014002183,0.9810454,0.0018473966,0.000020693196,0.010413272,0.00042838205],"about_ca_topic_score_codex":0.000605296,"about_ca_topic_score_gemma":0.0018553281,"teacher_disagreement_score":0.5880147,"about_ca_system_score_codex":0.00025008505,"about_ca_system_score_gemma":0.00004464587,"threshold_uncertainty_score":0.53233236},"labels":[],"label_agreement":null},{"id":"W4414387560","doi":"10.3390/ai6090238","title":"GRU-BERT for NILM: A Hybrid Deep Learning Architecture for Load Disaggregation","year":2025,"lang":"en","type":"article","venue":"AI","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Deep learning; Energy consumption; Software deployment; Transformer; Key (lock); Cloud computing; Encoder; Autoencoder; Architecture","score_opus":0.003842496880986651,"score_gpt":0.21336823480811856,"score_spread":0.20952573792713192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414387560","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011552134,0.00030158326,0.98052865,0.00096561067,0.0008248491,0.00041134533,0.000004019337,0.00034423443,0.0050675445],"genre_scores_gemma":[0.9882289,0.000024580973,0.00600605,0.00050555106,0.00029314755,0.00055479683,0.000079421035,0.000047484056,0.0042600613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994632,0.0000068361514,0.000115453964,0.00014435849,0.00007137759,0.00019876231],"domain_scores_gemma":[0.999699,0.0000923154,0.000014463114,0.00013882034,0.000032061092,0.000023321865],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009166977,0.000105447914,0.000102192156,0.000069993635,0.000071062415,0.000031514468,0.00009382543,0.000029789155,0.000009610817],"category_scores_gemma":[0.00008546102,0.000109627086,0.00006865053,0.00009226594,0.000009077698,0.0000496906,0.00002567207,0.000083976076,0.000007454977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019816987,0.000008291607,0.00019621893,0.0002064964,0.00009155965,7.0036924e-7,0.00010623164,0.8707357,0.00033961638,0.0034237402,0.02192981,0.10294179],"study_design_scores_gemma":[0.00054370536,0.000034311226,0.0004990694,0.000048839807,0.0000412019,7.5339574e-7,0.00001774168,0.36731791,0.0040104543,0.0044272942,0.6229136,0.00014510725],"about_ca_topic_score_codex":0.000010249767,"about_ca_topic_score_gemma":0.00006357321,"teacher_disagreement_score":0.97667676,"about_ca_system_score_codex":0.000092009315,"about_ca_system_score_gemma":0.000009017699,"threshold_uncertainty_score":0.44704628},"labels":[],"label_agreement":null},{"id":"W4414415798","doi":"10.1016/j.segan.2025.101983","title":"A market-clearing mechanism based on hierarchical-spectral clustering with multiple similarity measures for flexibility spot markets","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Flexibility (engineering); Cluster analysis; Scalability; Market clearing; Electricity; Clearing; Electric power system; Electricity market; Demand response","score_opus":0.005821031936481497,"score_gpt":0.19665212321673048,"score_spread":0.19083109128024897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414415798","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02528201,0.00033339168,0.95890373,0.00022607349,0.0004829397,0.00047384025,0.0000045457505,0.0004978601,0.013795583],"genre_scores_gemma":[0.9939962,0.000120250435,0.0027137878,0.00034086432,0.00024513432,0.00029737182,0.000018097156,0.00007224921,0.0021960645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790883,0.00007720121,0.00029553598,0.000569782,0.00021512929,0.0009335433],"domain_scores_gemma":[0.99885416,0.0003650771,0.000035861012,0.0004997798,0.00009265611,0.00015244485],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00075569266,0.0003938352,0.00036941984,0.00024701594,0.0003696738,0.00015063843,0.00021887908,0.00018613272,0.000022212813],"category_scores_gemma":[0.00007423386,0.0003674155,0.00010117432,0.00040105564,0.00007375057,0.00013019714,0.00015419342,0.0003038329,1.1011993e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010117211,0.00005308999,0.0005382489,0.00036106262,0.00012918974,0.000037823764,0.000014397057,0.96107125,0.000012448243,0.0270416,0.0022183105,0.0075108274],"study_design_scores_gemma":[0.0014607694,0.00014502021,0.0037280268,0.00012790765,0.00005233891,0.000001012484,0.0001444024,0.96666586,0.00044197278,0.0036806786,0.02316138,0.00039061828],"about_ca_topic_score_codex":0.00014176338,"about_ca_topic_score_gemma":0.0003948609,"teacher_disagreement_score":0.9687142,"about_ca_system_score_codex":0.00031504835,"about_ca_system_score_gemma":0.000049275157,"threshold_uncertainty_score":0.99987775},"labels":[],"label_agreement":null},{"id":"W4414450065","doi":"","title":"BuGUI: A Widget System for Button Grid Controllers","year":2025,"lang":"en","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Society for Arts and Technology","funders":"Irish Research Council","keywords":"","score_opus":0.005471558811649681,"score_gpt":0.18708115849475054,"score_spread":0.18160959968310086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414450065","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021898258,0.00092120405,0.7312643,0.0043269815,0.0014686211,0.0007199998,0.00004405928,0.0012180569,0.2381385],"genre_scores_gemma":[0.9765825,0.00010095425,0.012514674,0.00009570435,0.000044524942,0.00028325044,0.0001260504,0.000043804474,0.010208523],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99834603,0.00053788815,0.00033489554,0.00030399754,0.00016575484,0.00031141113],"domain_scores_gemma":[0.99764645,0.00073254533,0.000068713045,0.00095139147,0.00051886286,0.00008201366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019078747,0.00019215356,0.0002449203,0.00018524354,0.00019892653,0.00014600845,0.00053410075,0.00008637898,0.000020260964],"category_scores_gemma":[0.0003324492,0.00021064465,0.00012896699,0.00037801318,0.000057154797,0.00009888067,0.00014023275,0.00011721244,0.000026514432],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049828148,0.00027019755,0.0014219695,0.0012517768,0.0006254488,0.000006078524,0.002100583,0.041398022,0.007918609,0.81917816,0.09208251,0.03369682],"study_design_scores_gemma":[0.0025337387,4.927219e-7,0.0020713422,0.0012444345,0.000102834216,0.0000028639301,0.0003241256,0.43167865,0.085944645,0.0005808095,0.47504815,0.00046790508],"about_ca_topic_score_codex":0.00014249276,"about_ca_topic_score_gemma":0.0003299496,"teacher_disagreement_score":0.95468426,"about_ca_system_score_codex":0.00020383495,"about_ca_system_score_gemma":0.000040601702,"threshold_uncertainty_score":0.85898393},"labels":[],"label_agreement":null},{"id":"W4414463054","doi":"10.1109/icscds65426.2025.11167018","title":"AI-Enhanced IoT Energy Management: Integrating Monte Carlo Simulation, Game-Theoretic Approaches, and Agent-based Modeling for Sustainable Solutions","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CGI (Canada)","funders":"","keywords":"Monte Carlo method; Benchmark (surveying); Energy (signal processing); Supply chain; Resource (disambiguation); Process (computing); Resource allocation; Energy supply","score_opus":0.01561385701068039,"score_gpt":0.21831319517467604,"score_spread":0.20269933816399566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414463054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040686876,0.00040339943,0.9750853,0.00016914231,0.00014474838,0.00043746375,0.0000019078282,0.0004864857,0.019202871],"genre_scores_gemma":[0.9841624,0.000027513226,0.009996649,0.00027014452,0.000042006857,0.0004487821,0.000016677754,0.000045817505,0.0049900417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986805,0.00002440376,0.0003237945,0.00033687137,0.00012055332,0.0005139198],"domain_scores_gemma":[0.9994109,0.00008525312,0.000024492854,0.0003191275,0.00010197118,0.00005822083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023289374,0.00024223697,0.00020144127,0.00034011705,0.00020919146,0.00012756375,0.00015483605,0.00007357467,0.000011908192],"category_scores_gemma":[0.000035095025,0.00025298083,0.000074574324,0.000377764,0.000033391556,0.00013230178,0.00011242072,0.00008576843,8.388003e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009369847,0.00001412589,0.0000042788156,0.0003224241,0.00009242063,0.0000012805199,0.000047611677,0.7115075,0.000011909869,0.2850731,0.000472713,0.0024432747],"study_design_scores_gemma":[0.00066223793,0.000014007835,0.000006729701,0.00006068889,0.00009566,8.186934e-8,0.0010927431,0.98780185,0.00032856283,0.0047071152,0.0049927984,0.00023753842],"about_ca_topic_score_codex":0.00010695212,"about_ca_topic_score_gemma":0.0000773004,"teacher_disagreement_score":0.98009366,"about_ca_system_score_codex":0.00022683776,"about_ca_system_score_gemma":0.000017271725,"threshold_uncertainty_score":0.99999225},"labels":[],"label_agreement":null},{"id":"W4414539915","doi":"10.1109/icc52391.2025.11161003","title":"Advanced Home Energy Management Using Proximal Policy Optimization with a Comprehensive Appliance Set","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec","funders":"","keywords":"Energy management; Energy consumption; Baseline (sea); Relevance (law); Smart grid; Energy management system; Consumption (sociology); Set (abstract data type)","score_opus":0.0074314083392303075,"score_gpt":0.22088179161577015,"score_spread":0.21345038327653984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414539915","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054973764,0.00010638107,0.9493437,0.000105825326,0.00018626962,0.0002496034,0.000002183357,0.0005097357,0.043998916],"genre_scores_gemma":[0.6918091,0.00029538778,0.30165005,0.000862704,0.00013919732,0.0002722856,0.00004859953,0.00008685031,0.0048358105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991548,0.00001006976,0.00016527326,0.00024121223,0.00014347883,0.00028513843],"domain_scores_gemma":[0.99959403,0.000009559351,0.000022472976,0.0002919154,0.00004145421,0.00004057476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002018399,0.00019894086,0.00016349021,0.00028817265,0.000059777652,0.000040345298,0.00014513447,0.000034824963,0.000024446033],"category_scores_gemma":[8.7468874e-7,0.00018952256,0.000025499972,0.00075203576,0.000025364989,0.00014172014,0.0000970944,0.000048322352,0.0000038445955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020046238,0.000012589268,0.000046203582,0.0001308886,0.0001445065,0.000008940803,0.000013786188,0.9645126,0.0001279096,0.031424724,0.0005734273,0.0029844115],"study_design_scores_gemma":[0.000753089,0.0000190031,0.00040061574,0.000084811785,0.00003480375,0.0000019944914,0.00011253709,0.97367483,0.0009811142,0.00010657988,0.023579838,0.00025075706],"about_ca_topic_score_codex":0.000053005064,"about_ca_topic_score_gemma":0.000015525115,"teacher_disagreement_score":0.6863118,"about_ca_system_score_codex":0.00022652325,"about_ca_system_score_gemma":0.00001439855,"threshold_uncertainty_score":0.7728506},"labels":[],"label_agreement":null},{"id":"W4414543884","doi":"10.1257/app.20230468","title":"Down to the Wire: Leveraging Technology to Improve Electric Utility Cost Recovery","year":2025,"lang":"en","type":"article","venue":"American Economic Journal Applied Economics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Electric utility; Consumption (sociology); Revenue; Grid; Cost–benefit analysis; Expected utility hypothesis; Cost benefit","score_opus":0.0038960213491739492,"score_gpt":0.19583358307699208,"score_spread":0.19193756172781815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414543884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9134423,0.00009467258,0.04621394,0.006205311,0.0026558395,0.00072181784,0.00001661922,0.00026374948,0.030385757],"genre_scores_gemma":[0.99356085,0.0004206625,0.0016880889,0.0034277432,0.00041124833,0.00021184422,0.0000020930174,0.000057961486,0.00021951606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981732,0.000014935788,0.0006516894,0.00043647163,0.000034622346,0.0006891072],"domain_scores_gemma":[0.998888,0.00009120623,0.00015186999,0.00066290965,0.000016063233,0.0001899575],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048845337,0.00031196745,0.00048116845,0.0006606543,0.0002163918,0.00019871096,0.000828608,0.00006548893,0.00005982857],"category_scores_gemma":[0.000017926915,0.0003140518,0.00010998624,0.00046728543,0.000066628054,0.00011777971,0.0002519043,0.0004832063,0.0005756921],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003714849,0.0000086602295,0.00040780363,0.0000041314793,0.0002149534,7.74635e-7,0.000041796888,0.62672096,0.00017487005,0.0035085052,0.013150334,0.35573006],"study_design_scores_gemma":[0.0008839105,0.00016917339,0.011729415,0.000022604905,0.00009688312,0.000047548416,0.0012864282,0.07346185,0.006353949,0.0065014535,0.898356,0.0010907416],"about_ca_topic_score_codex":0.00006332983,"about_ca_topic_score_gemma":0.00015715665,"teacher_disagreement_score":0.8852057,"about_ca_system_score_codex":0.0018154209,"about_ca_system_score_gemma":0.000121421945,"threshold_uncertainty_score":0.99993116},"labels":[],"label_agreement":null},{"id":"W4414583580","doi":"10.1016/j.suscom.2025.101214","title":"A two-stage spatio-temporal flexibility-based energy optimization of internet data centers in active distribution networks based on robust control and transformer machine learning strategy","year":2025,"lang":"en","type":"article","venue":"Sustainable Computing Informatics and Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Mean squared error; Robustness (evolution); Mean absolute percentage error; Approximation error; Feature selection; Efficient energy use; Extreme learning machine; Renewable energy; Gradient boosting","score_opus":0.010361380630286141,"score_gpt":0.2174166966273537,"score_spread":0.20705531599706756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414583580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032074887,0.00011413156,0.9663274,0.00001181806,0.00012355062,0.00034471988,0.000038350943,0.000068032576,0.00089708646],"genre_scores_gemma":[0.998056,0.000012606377,0.00043133143,0.000023978311,0.000014451359,0.000010130285,0.001396769,0.000012006116,0.000042713815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987501,0.00008829724,0.0006047088,0.00014051482,0.00013642378,0.00027995423],"domain_scores_gemma":[0.99939924,0.00011402738,0.00013906127,0.00022344607,0.00008219385,0.000042045427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073172606,0.0001793109,0.00029468772,0.00021307908,0.00009518465,0.000115116556,0.00014375937,0.00006644451,0.000001556173],"category_scores_gemma":[0.000031724903,0.00017920889,0.000021004398,0.000279288,0.000034544966,0.00022597707,0.00008214492,0.0001654123,3.152779e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009014658,0.000021152886,0.0041118176,0.0014698053,0.000039647024,0.0000024453238,0.00015287795,0.9908971,2.3725218e-7,0.002373182,0.00003147116,0.0008101078],"study_design_scores_gemma":[0.001894111,0.00007440414,0.00020748442,0.00031553762,0.00001790534,3.0722538e-7,0.001785583,0.99491304,0.000007650747,0.000002909687,0.00064479065,0.0001362624],"about_ca_topic_score_codex":0.0013630536,"about_ca_topic_score_gemma":0.00009372714,"teacher_disagreement_score":0.9659811,"about_ca_system_score_codex":0.00020141175,"about_ca_system_score_gemma":0.00004193727,"threshold_uncertainty_score":0.73079264},"labels":[],"label_agreement":null},{"id":"W4414592678","doi":"10.3390/electronics14193846","title":"Climate-Adaptive Residential Demand Response Integration with Power Quality-Aware Distributed Generation Systems: A Comprehensive Multi-Objective Optimization Framework for Smart Home Energy Management","year":2025,"lang":"en","type":"article","venue":"Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Demand response; Flexibility (engineering); Renewable energy; Adaptability; Distributed generation; Home automation; Artificial neural network; Electric power system; Sensitivity (control systems)","score_opus":0.012628254243127624,"score_gpt":0.2512719327620055,"score_spread":0.23864367851887786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414592678","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0117707355,0.0015407271,0.9844565,0.00008132949,0.0007588517,0.0008870439,0.00007721199,0.0003569547,0.00007064056],"genre_scores_gemma":[0.9666174,0.00082499435,0.030126905,0.000097874414,0.00010297426,0.0010009662,0.00094603247,0.00008060333,0.00020221756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980737,0.00025922968,0.0004501887,0.000443845,0.00026320037,0.00050981005],"domain_scores_gemma":[0.9989105,0.00021789533,0.00012110602,0.0003957423,0.00030357426,0.000051210103],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036581312,0.00033193282,0.00032891316,0.00030229043,0.00023949938,0.00016300926,0.00016521553,0.00017666498,0.00000461957],"category_scores_gemma":[0.000039241626,0.0003339265,0.00007665881,0.00057178695,0.000033454075,0.00021708634,0.00006247416,0.00019636852,0.0000023063412],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012604094,0.000051731702,0.000022383403,0.00009457787,0.0004707122,0.000004586321,0.00012325835,0.9232168,0.00029742703,0.073468685,0.0007731996,0.00021622251],"study_design_scores_gemma":[0.0016033007,0.00033720577,0.0013580238,0.00024097896,0.00018557755,0.000002018675,0.00080089795,0.98775935,0.0033525857,0.0003076556,0.003609863,0.00044255244],"about_ca_topic_score_codex":0.000022892204,"about_ca_topic_score_gemma":0.00025937165,"teacher_disagreement_score":0.9548467,"about_ca_system_score_codex":0.0010478909,"about_ca_system_score_gemma":0.00005623,"threshold_uncertainty_score":0.99991125},"labels":[],"label_agreement":null},{"id":"W4414749338","doi":"10.3390/s25196082","title":"Personalized Smart Home Automation Using Machine Learning: Predicting User Activities","year":2025,"lang":"en","type":"article","venue":"Sensors","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Home automation; Adaptability; Software deployment; Activity recognition; Automation; Boosting (machine learning); Enhanced Data Rates for GSM Evolution; Software; Field (mathematics)","score_opus":0.009135004001628253,"score_gpt":0.215718626525094,"score_spread":0.20658362252346574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414749338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9862731,0.00014623337,0.0041081063,0.0000572412,0.00086068077,0.0000991427,0.0000026543585,0.0010678195,0.0073850057],"genre_scores_gemma":[0.9932052,0.000030165253,0.0014062343,0.000030119023,0.00009822927,0.000008377829,0.000014221827,0.000037463393,0.0051700072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992555,0.00004836439,0.0001618509,0.0001533083,0.00015172928,0.00022927731],"domain_scores_gemma":[0.9997206,0.00006314426,0.000027740109,0.00014241193,0.000015456118,0.000030671345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013191169,0.00015162949,0.00015465368,0.00021463184,0.000118558084,0.000051632105,0.00007467914,0.000058160327,0.000053909793],"category_scores_gemma":[0.000037081307,0.00016666247,0.000056715402,0.00024910478,0.000027430424,0.000120223274,0.000044796412,0.00016984351,0.000013746009],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007529455,0.0000071911195,0.021489196,0.000097900716,0.00012689224,0.000005118211,0.0003949228,0.9736742,0.002882247,0.0006551962,0.000229343,0.00043028846],"study_design_scores_gemma":[0.00030861565,0.0000072607463,0.0064366176,0.00006034887,0.00004111252,0.0000024668307,0.0003770401,0.9680179,0.0025416594,0.000024598592,0.022027822,0.00015459635],"about_ca_topic_score_codex":0.00009928371,"about_ca_topic_score_gemma":0.000027066277,"teacher_disagreement_score":0.02179848,"about_ca_system_score_codex":0.00016169756,"about_ca_system_score_gemma":0.000009929913,"threshold_uncertainty_score":0.67962986},"labels":[],"label_agreement":null},{"id":"W4414771054","doi":"10.1016/j.ijepes.2025.111142","title":"Distributed coordination of electric vehicles charging station and home energy management systems in residential neighborhood","year":2025,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Collège Shawinigan; Hydro-Québec; Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Fondation de l’UQTR","keywords":"Flexibility (engineering); Incentive; Energy management; Energy consumption; Electric vehicle; Baseline (sea); Demand response; Management system; Energy (signal processing)","score_opus":0.0034689424716547366,"score_gpt":0.2059865940925808,"score_spread":0.20251765162092605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414771054","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2425543,0.021984076,0.7200274,0.0005511472,0.009614617,0.00029445512,0.000030528576,0.00014303933,0.004800466],"genre_scores_gemma":[0.99859315,0.00092536886,0.000029768398,0.000022646236,0.00018406361,0.000021548582,0.000024564659,0.000022368376,0.00017653398],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99768007,0.0001265768,0.0010678808,0.0001855351,0.00067665713,0.00026327197],"domain_scores_gemma":[0.9989653,0.00014100522,0.00033363988,0.00012640597,0.00036858855,0.000065039974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039898735,0.00019677432,0.00038695824,0.0016488635,0.00002754315,0.00012048421,0.00036818083,0.00009727047,0.0000032744053],"category_scores_gemma":[0.00004247881,0.00019860575,0.000082277256,0.00085801,0.000018054345,0.00028663143,0.000057252848,0.00015481838,4.58164e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021494665,0.00018306114,0.0028047191,0.000117707736,0.0013739276,0.00018358645,0.000055446057,0.58355767,0.0077661322,0.3915244,0.006267395,0.0059510074],"study_design_scores_gemma":[0.0041565686,0.0002999977,0.035291005,0.0010676993,0.00017018378,0.00012704812,0.00021541821,0.9252971,0.0053827413,0.0026113368,0.024816379,0.0005645669],"about_ca_topic_score_codex":0.00039435367,"about_ca_topic_score_gemma":0.000015666505,"teacher_disagreement_score":0.75603884,"about_ca_system_score_codex":0.0006224202,"about_ca_system_score_gemma":0.00003836634,"threshold_uncertainty_score":0.80989075},"labels":[],"label_agreement":null},{"id":"W4414904970","doi":"10.1016/j.jclepro.2025.146538","title":"Optimal dispatch of clean resources in networked microgrids: A rank transactive energy framework","year":2025,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Probabilistic logic; Transactive memory; Quantile; Stochastic process; Quantization (signal processing); Distributed generation; Ranking (information retrieval); Process (computing); Convergence (economics)","score_opus":0.0037996107273807426,"score_gpt":0.20277993292044,"score_spread":0.19898032219305925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414904970","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9012219,0.0011456381,0.09376966,0.00067499006,0.0021449232,0.00009249078,6.0927874e-7,0.000043008182,0.00090680696],"genre_scores_gemma":[0.9947604,0.0007076808,0.0034981368,0.000032290383,0.0007418252,0.000004889699,9.299753e-7,0.00002537843,0.00022848485],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99871916,0.0000780893,0.00062373216,0.00015315627,0.00022197646,0.00020387614],"domain_scores_gemma":[0.9994374,0.000053583946,0.00016506627,0.00020754975,0.00009794951,0.000038479437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046836096,0.00015097776,0.0003291001,0.00044392212,0.00002706707,0.00001952711,0.00018910489,0.00009913619,0.000017473842],"category_scores_gemma":[0.00005372184,0.00014299218,0.00012250786,0.0005485238,0.00005008722,0.00021196221,0.000017474134,0.0003506577,5.529576e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030212416,0.0000859701,0.0005931509,0.00007510897,0.00018278582,0.000009026518,0.0006629111,0.93570393,0.0011466801,0.00010871138,0.0035022993,0.057627328],"study_design_scores_gemma":[0.005596216,0.0009584221,0.08804436,0.004861099,0.0008450121,0.00017417065,0.008761324,0.11685801,0.36315486,0.004071202,0.4051746,0.0015007147],"about_ca_topic_score_codex":0.00003707437,"about_ca_topic_score_gemma":0.000049451708,"teacher_disagreement_score":0.81884587,"about_ca_system_score_codex":0.00013103918,"about_ca_system_score_gemma":0.000017542712,"threshold_uncertainty_score":0.5831052},"labels":[],"label_agreement":null},{"id":"W4415137043","doi":"10.5539/mas.v19n2p48","title":"Adaptive Load Sharing Strategy for Multi-Source Renewable Energy Systems","year":2025,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Battery (electricity); Renewable energy; Photovoltaic system; Energy storage; Power (physics); MATLAB; Electric power system; State of charge; Load following power plant; Electricity generation","score_opus":0.03489984406199082,"score_gpt":0.24324621613375577,"score_spread":0.20834637207176496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415137043","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00091069465,0.0002651668,0.9351574,0.00000623222,0.00050420256,0.00024455268,0.0000028226423,0.0003970115,0.06251189],"genre_scores_gemma":[0.9887806,0.000009496171,0.003942392,0.000049889823,0.00005952957,0.00035388875,0.0000021893884,0.000026308717,0.006775706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840575,0.0000036623464,0.00021970576,0.00052464,0.000320363,0.0005258538],"domain_scores_gemma":[0.99933136,0.000028130491,0.000030155208,0.0004555687,0.00006983572,0.00008496675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040355793,0.00018846602,0.00018444163,0.00019470573,0.00024055915,0.00019935373,0.00069397833,0.000054597556,0.0000028266456],"category_scores_gemma":[0.000010779014,0.0001985097,0.000034636778,0.00059631653,0.00011427411,0.00015468265,0.00019820644,0.00006728378,0.000006643357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075028765,0.000012574286,0.000009401514,0.00004143332,0.000018750325,4.991577e-7,0.00007935539,0.95542496,0.026845291,0.013919026,0.0007065106,0.0029346913],"study_design_scores_gemma":[0.00033378805,0.00000934286,0.000048457016,0.000029199187,0.000010930517,3.6674427e-7,0.00015132639,0.9829089,0.008659949,0.000998283,0.0066509875,0.00019848425],"about_ca_topic_score_codex":0.0005434174,"about_ca_topic_score_gemma":0.00022256548,"teacher_disagreement_score":0.9878699,"about_ca_system_score_codex":0.00044707902,"about_ca_system_score_gemma":0.00009035107,"threshold_uncertainty_score":0.8094991},"labels":[],"label_agreement":null},{"id":"W4415166551","doi":"10.54254/2755-2721/2026.ka27660","title":"Research on Intelligent Control and Optimization Strategies for Household Electricity Usage","year":2025,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Earl Haig Secondary School","funders":"","keywords":"Electricity; Consumption (sociology); Energy consumption; Energy conservation; Electricity generation; Control (management); Mains electricity; Power consumption","score_opus":0.018318544722487253,"score_gpt":0.24571420295108534,"score_spread":0.22739565822859809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415166551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019320522,0.00015127542,0.97839236,0.00004560555,0.00008154964,0.0002338535,0.000003908496,0.0001614092,0.001609512],"genre_scores_gemma":[0.99018186,0.000038229173,0.009519193,0.000054312284,0.00004523105,0.0001203292,0.00001225255,0.000015548338,0.000013039582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994866,0.000004545415,0.000110124085,0.0001384204,0.00010343777,0.000156855],"domain_scores_gemma":[0.9996095,0.0002794659,0.0000063342186,0.000050882896,0.000025089566,0.000028772916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016225224,0.000093268885,0.00009204008,0.0002193361,0.00006718863,0.00007794257,0.000044932418,0.000034653145,7.8391287e-7],"category_scores_gemma":[0.0000057306097,0.00010204115,0.000011462132,0.00019531786,0.00001369843,0.00004111925,0.00001666089,0.00009764035,4.1020544e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008716339,0.0000054145507,0.0000028140353,0.000060076603,0.000032297135,2.1113713e-7,0.000015005026,0.7714131,0.00012581405,0.22668211,0.00015201318,0.0015024099],"study_design_scores_gemma":[0.00034602417,0.000019286279,0.0006144214,0.000017212364,0.0000073663077,3.1620877e-7,0.000046546043,0.9946806,0.00016310759,0.0029443079,0.0010750446,0.000085797255],"about_ca_topic_score_codex":0.000002338429,"about_ca_topic_score_gemma":4.8456417e-7,"teacher_disagreement_score":0.9708613,"about_ca_system_score_codex":0.00004311923,"about_ca_system_score_gemma":0.000010988579,"threshold_uncertainty_score":0.41611174},"labels":[],"label_agreement":null},{"id":"W4415179402","doi":"10.1007/978-981-96-7477-0_47","title":"A Novel Approach for Monitoring and Controlling Energy in Smart Homes","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Energy (signal processing); Smart grid; Energy consumption; Home automation; Control (management); The Internet; Sustainability; Electric energy; Electricity; Power (physics)","score_opus":0.011289055770494391,"score_gpt":0.19399139367428095,"score_spread":0.18270233790378657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415179402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000054438104,0.05896303,0.9242392,0.000011382695,0.0018342339,0.00048549654,0.000008844074,0.00008525579,0.0143181095],"genre_scores_gemma":[0.9851916,0.005178488,0.002219692,0.000036087597,0.0023842542,0.00041298082,0.00007378611,0.0001475625,0.004355594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874765,0.000011415892,0.00042039488,0.00038514595,0.00010637795,0.00032899293],"domain_scores_gemma":[0.9993062,0.000363946,0.00005999812,0.00020326085,0.00002037655,0.000046200737],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023078633,0.0003905289,0.0007023963,0.00029150295,0.000040291372,0.00010416526,0.00010311041,0.00049074437,5.2203296e-7],"category_scores_gemma":[0.000015782776,0.00037907207,0.00005974408,0.00006640625,0.000023286191,0.00003520062,0.000056410903,0.00032430553,3.8478664e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016619859,0.0000039536403,0.00038671514,0.0005907845,0.000119841745,0.0000042718907,0.000035612724,0.98365194,0.00000875657,0.0068524606,0.00006422381,0.008264829],"study_design_scores_gemma":[0.0007896411,0.000017073624,0.000059028927,0.001124472,0.000041354968,0.000004931706,0.0000065298814,0.980986,0.0000039713927,0.0003118635,0.016300155,0.00035497182],"about_ca_topic_score_codex":0.00016274494,"about_ca_topic_score_gemma":0.00015073,"teacher_disagreement_score":0.9851371,"about_ca_system_score_codex":0.00010768081,"about_ca_system_score_gemma":0.0000078868325,"threshold_uncertainty_score":0.9998661},"labels":[],"label_agreement":null},{"id":"W4415221198","doi":"10.1016/j.segan.2025.101999","title":"NeuraFlux: A scalable and adaptive framework for autonomous data-driven multi-agent power optimization","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scalability; Reinforcement learning; Modular design; Robustness (evolution); Software deployment; Modularity (biology); Electric power system; Smart grid; Key (lock)","score_opus":0.010273663390656445,"score_gpt":0.22644476057411417,"score_spread":0.21617109718345773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415221198","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011695793,0.004308396,0.9921054,0.00010949686,0.00066110416,0.00028787958,0.000010058446,0.0002564388,0.0010916488],"genre_scores_gemma":[0.900106,0.0037619532,0.08532632,0.00056449935,0.00041459125,0.00041320195,0.0002607106,0.00012485174,0.009027842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985989,0.000025079495,0.00024438952,0.00047450984,0.000080664744,0.00057645945],"domain_scores_gemma":[0.99919,0.00012138502,0.000038346185,0.00045543027,0.00008862932,0.000106259205],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001818932,0.0002489834,0.00026446342,0.0001350524,0.00026541343,0.00020239606,0.00023044492,0.00018896232,0.000017705413],"category_scores_gemma":[0.00003910202,0.00027412997,0.000034189157,0.00033936137,0.00006279557,0.0002831415,0.000426496,0.00015504306,2.1831977e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025664249,0.00002438094,0.00009035352,0.00007266945,0.00013413584,0.000015895152,0.0000313738,0.93293256,5.7537886e-7,0.054943554,0.007983284,0.0037455347],"study_design_scores_gemma":[0.0005146402,0.00005448154,0.00025525226,0.00005752904,0.00006582922,0.0000018535717,0.00039365672,0.93333876,0.000007709156,0.000918296,0.064141005,0.00025096632],"about_ca_topic_score_codex":0.00018027646,"about_ca_topic_score_gemma":0.000052585903,"teacher_disagreement_score":0.90677905,"about_ca_system_score_codex":0.00012391242,"about_ca_system_score_gemma":0.00003166261,"threshold_uncertainty_score":0.9999711},"labels":[],"label_agreement":null},{"id":"W4415256576","doi":"10.2196/71265","title":"Daily Household Electricity Consumption in Community-Dwelling Older Individuals With Cognitive Impairment: Prospective Cohort Study","year":2025,"lang":"en","type":"article","venue":"JMIR Formative Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Consumption (sociology); Cognition; Prospective cohort study; Cognitive impairment; Cohort study; Cohort; Electricity","score_opus":0.032077647292091026,"score_gpt":0.33270228328302587,"score_spread":0.30062463599093486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415256576","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9844364,0.00007912888,0.00254375,0.000017267534,0.000072946445,0.003996979,0.000020622947,0.00025517493,0.008577752],"genre_scores_gemma":[0.9970745,0.00006626217,0.000034902798,0.000019944444,0.00001863283,0.0026056587,0.000035302834,0.000037006484,0.00010780676],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99690646,0.00090505695,0.00038462522,0.00026480423,0.00081940106,0.00071963406],"domain_scores_gemma":[0.9987693,0.0005299476,0.000045451692,0.00037245936,0.00020774039,0.00007510987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030714117,0.00025906193,0.00034366606,0.0013065479,0.00044051188,0.00015027336,0.0003622678,0.00008681341,0.000026229778],"category_scores_gemma":[0.00004416709,0.00023656708,0.00003479973,0.002025128,0.00014211235,0.0005157938,0.0002782692,0.0017850724,0.000046087705],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000113849266,0.0011967368,0.96308756,0.0002586218,0.00050932256,0.000013737511,0.017107168,0.016182654,0.000011992227,0.00023517861,0.00070623873,0.000576918],"study_design_scores_gemma":[0.0026575632,0.0005767462,0.9788174,0.0003665122,0.00002522542,0.0000013371417,0.009168979,0.0069371304,0.0010049592,0.00015763189,0.00005864085,0.00022785788],"about_ca_topic_score_codex":0.00037208287,"about_ca_topic_score_gemma":0.00052654214,"teacher_disagreement_score":0.015729833,"about_ca_system_score_codex":0.00089935085,"about_ca_system_score_gemma":0.000053282507,"threshold_uncertainty_score":0.96469253},"labels":[],"label_agreement":null},{"id":"W4415535235","doi":"10.1016/j.segan.2025.102028","title":"Predictive risk-aware control for microgrids: Operation of a revenue-generating energy management system","year":2025,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Vedecká Grantová Agentúra MŠVVaŠ SR a SAV; Agentúra na Podporu Výskumu a Vývoja; European Commission; St. Thomas University","keywords":"Microgrid; Model predictive control; Modular design; Energy management; Renewable energy; Software deployment; Software; Energy management system; Software architecture","score_opus":0.0015207874289688249,"score_gpt":0.167958716183471,"score_spread":0.16643792875450217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415535235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023196407,0.005473314,0.98882216,0.00002832333,0.00076547876,0.0003559538,0.000037798276,0.00019362838,0.0020037012],"genre_scores_gemma":[0.99233824,0.001757778,0.0008823149,0.00008371184,0.00046976254,0.0007687266,0.00008195414,0.000049462604,0.0035680393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984838,0.0000708652,0.00044702212,0.00035117735,0.00012351655,0.0005236273],"domain_scores_gemma":[0.99927604,0.00009318604,0.00010037488,0.00030469676,0.00015852418,0.00006714915],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037148758,0.00027623746,0.00037492308,0.00022790731,0.0002743671,0.00007706294,0.00016621624,0.00014515915,0.0000023654454],"category_scores_gemma":[0.0000102342865,0.00028363633,0.00009675248,0.00033266947,0.000042896132,0.0001350932,0.00011000299,0.00009643213,9.172874e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006862799,0.000019505693,0.00014027307,0.0006647283,0.00047998125,0.000012628992,0.000029769217,0.87808514,0.00002793359,0.09821498,0.009845256,0.012411168],"study_design_scores_gemma":[0.0013219229,0.00009296465,0.00015576344,0.00019768171,0.00023954186,0.0000013765863,0.0012468774,0.93581504,0.00046118512,0.0002910386,0.059941955,0.00023465329],"about_ca_topic_score_codex":0.00035435907,"about_ca_topic_score_gemma":0.00007266602,"teacher_disagreement_score":0.9900186,"about_ca_system_score_codex":0.00025594002,"about_ca_system_score_gemma":0.0000237944,"threshold_uncertainty_score":0.99996156},"labels":[],"label_agreement":null},{"id":"W4415819116","doi":"10.3390/en18215756","title":"Techno-Economic Assessment of Net Metering and Energy Sharing in a Mixed-Use Renewable Energy Community in Montreal: A Simulation-Based Approach Using Tool4Cities","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Net metering; Renewable energy; Tariff; Metering mode; Subsidy; Key (lock); Workflow; Feed-in tariff; Micro hydro","score_opus":0.021967154445346006,"score_gpt":0.24643677305907738,"score_spread":0.22446961861373138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415819116","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91025084,0.0002529892,0.08556711,0.0000061636015,0.00015317128,0.000046603163,0.0000056866165,0.00014724027,0.0035702232],"genre_scores_gemma":[0.9915361,0.00007889799,0.008074358,0.0000216661,0.00001545104,0.00007572344,0.000024716981,0.000031962252,0.00014113751],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886125,0.00009404713,0.00045516455,0.00022243899,0.00009418758,0.00027288642],"domain_scores_gemma":[0.9990718,0.00037644856,0.000058949583,0.00045148822,0.000015067748,0.000026293977],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032601823,0.00022856264,0.00037670805,0.0008273676,0.00006454055,0.00008139715,0.0002391048,0.00009526461,0.000003743912],"category_scores_gemma":[0.000028024022,0.00027141123,0.000042894346,0.00035467508,0.000054857883,0.00028978052,0.00025360123,0.00013517769,3.264642e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075175335,0.000038080558,0.011213999,0.00013489177,0.000050350518,0.0000023557461,0.00008756235,0.98321,0.0010557761,0.0030479368,0.000015536441,0.0011359385],"study_design_scores_gemma":[0.00050551543,0.000010301122,0.014464127,0.00015972568,0.000016383972,2.418019e-7,0.00042930464,0.97994024,0.0033034096,0.00048589654,0.00047784945,0.00020701905],"about_ca_topic_score_codex":0.13492313,"about_ca_topic_score_gemma":0.039017145,"teacher_disagreement_score":0.09590598,"about_ca_system_score_codex":0.0004018739,"about_ca_system_score_gemma":0.00003403886,"threshold_uncertainty_score":0.99997383},"labels":[],"label_agreement":null},{"id":"W4416136419","doi":"10.1109/pesgm52009.2025.11225144","title":"Electrification in Residential Buildings using Distributionally Robust Optimization","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"HVAC; Electrification; Robust optimization; Demand response; Scheduling (production processes); Electric power system; Robustness (evolution); Peak demand; Energy management","score_opus":0.010807444581076766,"score_gpt":0.22618053679072456,"score_spread":0.2153730922096478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416136419","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016311096,0.0004336822,0.9691718,0.00064113125,0.0013309504,0.0003656402,0.000005701425,0.00016447944,0.011575494],"genre_scores_gemma":[0.94268286,0.0004635126,0.05450749,0.00007756076,0.00022576516,0.000038068778,0.00016222951,0.00003480228,0.0018077298],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799484,0.00006521253,0.0007192146,0.0004731371,0.00027973542,0.00046787076],"domain_scores_gemma":[0.9993381,0.000055645778,0.000078826524,0.00035659564,0.00011994128,0.00005087932],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042453746,0.0002728999,0.00023885556,0.00071076927,0.0001344504,0.00019836017,0.00026762614,0.00019655356,0.00039810932],"category_scores_gemma":[0.00012800121,0.00036076305,0.0000764914,0.0020058972,0.000033243366,0.00041205436,0.00007276112,0.00023578538,0.000012638158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024963374,0.000058054,0.0008100621,0.000087841894,0.00007701361,0.0000032756896,0.000012087151,0.9079092,0.0023249723,0.086429685,0.0018100803,0.00045275592],"study_design_scores_gemma":[0.0006276624,0.000009758906,0.0058310186,0.00017542635,0.000083405845,0.0000010184815,0.000031342992,0.98444235,0.006327978,0.00020139336,0.0019813967,0.00028726604],"about_ca_topic_score_codex":0.00045768524,"about_ca_topic_score_gemma":0.000091565926,"teacher_disagreement_score":0.92637175,"about_ca_system_score_codex":0.0014573038,"about_ca_system_score_gemma":0.00013372717,"threshold_uncertainty_score":0.9998844},"labels":[],"label_agreement":null},{"id":"W4416291673","doi":"10.29173/alr2877","title":"Data Centres, AI, and Electrification — Legal and Corporate Approaches to Growing Power Demands in Canada","year":2025,"lang":"","type":"article","venue":"Alberta Law Review","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Renewable Energy Laboratory","keywords":"Electrification; Electricity; Legislature; Investment (military); Construct (python library); Shareholder; Electricity generation; Energy law; Generative grammar","score_opus":0.04648796634822885,"score_gpt":0.2231261709297732,"score_spread":0.17663820458154433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416291673","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018238284,0.8889553,0.0020059638,0.046620417,0.0014469852,0.0033211724,0.00006584002,0.000049931707,0.039296113],"genre_scores_gemma":[0.89598626,0.09610454,0.0002173082,0.0067231404,0.000038632443,0.000078877456,0.00019448853,0.000043233726,0.000613496],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99779284,0.00011828397,0.0006909444,0.00074465695,0.00018178472,0.00047147303],"domain_scores_gemma":[0.99849063,0.00015944197,0.00009949812,0.0010684034,0.000019417492,0.00016257972],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004948282,0.00035357618,0.0006154303,0.00008808039,0.00008650133,0.00011678322,0.0004426196,0.000059935548,0.00003422836],"category_scores_gemma":[0.00012799198,0.00037823137,0.000023586113,0.00075665815,0.000030251602,0.00054021965,0.00032945315,0.00023645782,0.000005812806],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029583476,0.00006637367,0.009126513,0.017575355,0.0005873266,0.000049161863,0.000066796805,0.0068203164,0.000045587865,0.8664671,0.046776485,0.052389376],"study_design_scores_gemma":[0.00031773464,0.000014141522,0.004225645,0.0058022155,0.00028456454,0.0000066745483,0.000014450325,0.022515139,0.00006764403,0.00006620012,0.96625,0.0004355758],"about_ca_topic_score_codex":0.8093313,"about_ca_topic_score_gemma":0.9730143,"teacher_disagreement_score":0.9194735,"about_ca_system_score_codex":0.00036544685,"about_ca_system_score_gemma":0.00029560793,"threshold_uncertainty_score":0.99986696},"labels":[],"label_agreement":null},{"id":"W4416341996","doi":"10.1109/epec65543.2025.11230430","title":"Meta-Reinforcement Learning for Building Energy Management System","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; McGill University","funders":"","keywords":"Reinforcement learning; Control (management); Efficient energy use; Key (lock); Adaptation (eye); Energy management; Baseline (sea); Renewable energy","score_opus":0.01745634665836238,"score_gpt":0.22171423892839148,"score_spread":0.2042578922700291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416341996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005341581,0.0023869975,0.74020624,0.00020352448,0.0037116003,0.00080813456,0.0000013515659,0.00087440154,0.2517543],"genre_scores_gemma":[0.81108165,0.00072180456,0.022360375,0.0003107055,0.00030320484,0.0022222006,0.000029191564,0.00013438292,0.16283649],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99585086,0.000086024076,0.0013438483,0.0009309286,0.000528168,0.0012601527],"domain_scores_gemma":[0.9984174,0.0002096649,0.00016600241,0.00091375253,0.000119551776,0.00017366286],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00087373087,0.00089407625,0.0011120769,0.0009987662,0.0004978436,0.00032295444,0.0007103557,0.00020365742,0.000428048],"category_scores_gemma":[0.000016165364,0.0009023754,0.0009156514,0.000908435,0.00003775094,0.00024788515,0.0007583018,0.00022880838,0.000043190637],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001993819,0.00001812164,0.0000063350703,0.002332738,0.018563598,0.000009423111,0.000020338799,0.52787036,0.0000497341,0.4397024,0.00556355,0.0058434927],"study_design_scores_gemma":[0.00087608176,0.000051697243,0.00001407938,0.0002533676,0.007962903,8.4013953e-7,0.0003658635,0.5504475,0.0027022013,0.00013371599,0.43671745,0.00047425742],"about_ca_topic_score_codex":0.00019297158,"about_ca_topic_score_gemma":0.000017943552,"teacher_disagreement_score":0.81102824,"about_ca_system_score_codex":0.0012819677,"about_ca_system_score_gemma":0.000027686967,"threshold_uncertainty_score":0.9993427},"labels":[],"label_agreement":null},{"id":"W4416342144","doi":"10.1109/epec65543.2025.11230417","title":"Auction-Based DER Markets: Learnings from the York Region NWA Demonstration","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Resource (disambiguation); Key (lock); Common value auction; Electricity; Grid; Energy market; Electricity market; Service (business)","score_opus":0.00925866411837727,"score_gpt":0.1941686266289476,"score_spread":0.18490996251057032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342144","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02210322,0.0015946301,0.87504095,0.011789285,0.0050531155,0.000522932,0.000002903875,0.00063305924,0.08325993],"genre_scores_gemma":[0.9838897,0.00017707354,0.0021195435,0.0015616018,0.00054708833,0.00007972251,0.000047338002,0.000050194492,0.011527743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980638,0.0001940137,0.0005247828,0.0005007611,0.00030528256,0.00041138014],"domain_scores_gemma":[0.99840933,0.0005945853,0.00009436235,0.00077060517,0.000064249194,0.00006684523],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003621835,0.0003710508,0.0002361726,0.00016305619,0.00040695173,0.00027927247,0.00038502767,0.00022307005,0.0012051502],"category_scores_gemma":[0.00014105994,0.00032132998,0.0001693398,0.0007734797,0.00009946355,0.00018204699,0.00008732462,0.00043308808,0.00016051505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006130586,0.000043690423,0.009035355,0.000054853474,0.00045692179,0.0000056781164,0.00012452,0.8043871,0.00009690709,0.0047740187,0.15623069,0.024728952],"study_design_scores_gemma":[0.00069581484,0.000019676798,0.06400782,0.0002599014,0.00031624152,7.2449063e-7,0.0007012793,0.69898474,0.0012073375,0.000451557,0.23300423,0.00035064883],"about_ca_topic_score_codex":0.0011975499,"about_ca_topic_score_gemma":0.0004560519,"teacher_disagreement_score":0.96178645,"about_ca_system_score_codex":0.000324626,"about_ca_system_score_gemma":0.000095020885,"threshold_uncertainty_score":0.9999239},"labels":[],"label_agreement":null},{"id":"W4416342332","doi":"10.1109/epec65543.2025.11230441","title":"Assessing Heating Electrification Trade-Offs Using Data-Driven Modelling for Future Grid Planning","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"Mitacs","keywords":"Thermostat; Electrification; Backup; Demand response; Electric heating; Electricity; Grid; Smart grid; Work (physics)","score_opus":0.0816992017860686,"score_gpt":0.323569486642245,"score_spread":0.2418702848561764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023971774,0.0031352139,0.9609564,0.000621637,0.0057902425,0.00091024983,0.000034041426,0.000548776,0.0040316526],"genre_scores_gemma":[0.68024176,0.00022593331,0.31399328,0.0002110431,0.0042750076,0.00006121417,0.0006505774,0.00016268143,0.00017852311],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960296,0.00009512715,0.0011915785,0.001217254,0.00037860498,0.001087836],"domain_scores_gemma":[0.9978044,0.00032570979,0.0002245789,0.0014356743,0.000082475664,0.00012718744],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007808319,0.00065260794,0.0006444733,0.00060817646,0.0008600969,0.0010288254,0.0009745317,0.0003568774,0.000024496983],"category_scores_gemma":[0.000056771685,0.0007769294,0.00016639446,0.0011175623,0.000033379332,0.001992537,0.00020356072,0.0005810239,0.0000030601395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002139804,0.0000470166,0.00018118261,0.0007594139,0.00044519594,0.0000037503519,0.00035141964,0.97417766,0.0048861657,0.005568722,0.0018607919,0.011697297],"study_design_scores_gemma":[0.000700006,0.000021884363,0.00020370689,0.0008200709,0.0005033918,0.0000035021828,0.001860827,0.9757834,0.00330032,0.00018758228,0.01592893,0.0006863985],"about_ca_topic_score_codex":0.000097049684,"about_ca_topic_score_gemma":0.00000956314,"teacher_disagreement_score":0.65626997,"about_ca_system_score_codex":0.0006925009,"about_ca_system_score_gemma":0.00020232952,"threshold_uncertainty_score":0.99946815},"labels":[],"label_agreement":null},{"id":"W4416342333","doi":"10.1109/epec65543.2025.11230454","title":"Modified Energy Management System for Virtual Power Plant Applications","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Virtual power plant; Electricity market; Scheduling (production processes); Renewable energy; Profit (economics); Electricity; Energy management; Electric power system; Energy management system","score_opus":0.006481152639383078,"score_gpt":0.1964978685293445,"score_spread":0.19001671588996144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004288256,0.00028927345,0.66480786,0.00018174385,0.0026153862,0.0010135752,0.00008911997,0.0005832401,0.33037692],"genre_scores_gemma":[0.9242051,0.00021297258,0.0052947863,0.00033471765,0.00025926466,0.005808908,0.00017128563,0.00009733558,0.06361561],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99740505,0.000030276131,0.0007965684,0.0007501773,0.00029014773,0.0007277635],"domain_scores_gemma":[0.9984566,0.00012568258,0.000073429714,0.0011331722,0.00007039452,0.00014073204],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024295025,0.0005128597,0.00045141517,0.0005820511,0.00026437256,0.00016247686,0.0006554803,0.00019004618,0.000095170704],"category_scores_gemma":[0.000003333436,0.0005652247,0.00024097593,0.0006465572,0.000039236173,0.000111182766,0.00038078745,0.00010613028,0.00006328526],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002982805,0.00007022142,0.0000018900689,0.0006723085,0.0009180313,0.0000036837544,0.000016714914,0.34206745,0.000046242043,0.6208053,0.029571546,0.0057967794],"study_design_scores_gemma":[0.0011226494,0.000044650787,0.00008141405,0.0001898896,0.00032307568,0.0000012201133,0.0006807022,0.32138738,0.0008725059,0.00041862254,0.6744304,0.00044749764],"about_ca_topic_score_codex":0.000074837844,"about_ca_topic_score_gemma":0.000031717445,"teacher_disagreement_score":0.9241622,"about_ca_system_score_codex":0.0006954012,"about_ca_system_score_gemma":0.00002776378,"threshold_uncertainty_score":0.9996799},"labels":[],"label_agreement":null},{"id":"W4416342360","doi":"10.1109/epec65543.2025.11230410","title":"Multi-Objective Optimization of Thermal Energy Storage in Buildings Through Load Decomposition","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Smoothing; Thermal energy storage; Thermal; Filter (signal processing); Peaking power plant; Energy storage; Parametric statistics; Optimization problem; Pareto principle; Energy (signal processing)","score_opus":0.007216132752423034,"score_gpt":0.23518102980909739,"score_spread":0.22796489705667436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342360","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03944758,0.00082578615,0.91742545,0.000114038645,0.0012696432,0.00025699707,0.0000045230295,0.00013331915,0.040522687],"genre_scores_gemma":[0.908496,0.0005450823,0.08962409,0.00014636468,0.00006334819,0.00005415109,0.000017322289,0.000045882818,0.0010077497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980432,0.00010373509,0.0007121587,0.0004615892,0.00027513187,0.0004042217],"domain_scores_gemma":[0.9992049,0.000092556234,0.000117449235,0.00039452757,0.00015239712,0.000038214308],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023507251,0.00036454425,0.0004295474,0.00040986895,0.000062421364,0.00004554395,0.00026827207,0.0002185583,0.0003232563],"category_scores_gemma":[0.000034037184,0.00042597004,0.00012396998,0.0011227219,0.00006309483,0.0005175903,0.00021265002,0.00018012429,0.000004672747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067398716,0.0002684111,0.00038014233,0.00015060896,0.00024224982,0.000007911246,0.0007458715,0.9743747,0.008870962,0.012860038,0.00025428625,0.0017774376],"study_design_scores_gemma":[0.0017062082,0.000053822325,0.0044582095,0.00030703464,0.0000758838,5.0850383e-7,0.00030729917,0.9501824,0.04158797,0.00007697771,0.000913117,0.000330617],"about_ca_topic_score_codex":0.0031085364,"about_ca_topic_score_gemma":0.00045013378,"teacher_disagreement_score":0.8690484,"about_ca_system_score_codex":0.0010884163,"about_ca_system_score_gemma":0.00008091985,"threshold_uncertainty_score":0.9998192},"labels":[],"label_agreement":null},{"id":"W4416342703","doi":"10.1109/epec65543.2025.11230378","title":"Two-Stage Probabilistic Framework for Electricity Price Prediction in Competitive Markets","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ballard Power Systems (Canada)","funders":"","keywords":"Estimator; Probabilistic logic; Probability density function; Nonparametric statistics; Electricity; Nonlinear system; Feature (linguistics); Density estimation; Function (biology)","score_opus":0.008260372588360713,"score_gpt":0.2404323245690548,"score_spread":0.2321719519806941,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0125944335,0.0003407616,0.7572357,0.00033990637,0.0025891783,0.0024384945,0.000050074697,0.00037548746,0.22403598],"genre_scores_gemma":[0.9574053,0.00018948602,0.027664853,0.00028573393,0.00030905605,0.00094210904,0.000038759437,0.00007045072,0.013094195],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972023,0.00012672173,0.0008030839,0.00073607976,0.00026860787,0.0008632184],"domain_scores_gemma":[0.99787045,0.0012510187,0.00008693474,0.00055991916,0.00013324166,0.000098426135],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00079500093,0.00045947402,0.00049003126,0.0006144746,0.00012669987,0.000116932184,0.00034553243,0.00027769225,0.00062399043],"category_scores_gemma":[0.0008843522,0.0005382563,0.00014642195,0.0017824431,0.000058800088,0.0002022401,0.00017811568,0.00057369063,0.000031110678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016139598,0.0002046945,0.002124996,0.0009772747,0.0002050845,0.0000051091392,0.00008648999,0.3597887,0.000050460054,0.63365024,0.0014213325,0.0013242151],"study_design_scores_gemma":[0.0018243042,0.0001323874,0.05184523,0.0007501163,0.00013910363,5.663699e-7,0.00028270623,0.8938533,0.0008793247,0.020810146,0.028990945,0.00049184624],"about_ca_topic_score_codex":0.000099075165,"about_ca_topic_score_gemma":0.00021436409,"teacher_disagreement_score":0.9448109,"about_ca_system_score_codex":0.0013981537,"about_ca_system_score_gemma":0.00009600867,"threshold_uncertainty_score":0.9997069},"labels":[],"label_agreement":null},{"id":"W4416342782","doi":"10.1109/epec65543.2025.11230427","title":"Augmented Capacity Market Design Including Demand Response, Import and Transmission Capacity Enhancement","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Capacity planning; Arbitrage; Capacity management; Transmission (telecommunications); Nameplate capacity; Carrying capacity","score_opus":0.030718453373848622,"score_gpt":0.2410013161068552,"score_spread":0.2102828627330066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342782","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2608895,0.0009862605,0.7108487,0.00082346913,0.0010683513,0.0009898575,0.000006438185,0.0002683414,0.024119068],"genre_scores_gemma":[0.95189375,0.0020817185,0.032211747,0.00032104418,0.00008165464,0.00015037593,0.000005018379,0.00007129717,0.013183369],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.995475,0.00075168046,0.0011669775,0.0010147418,0.00057362486,0.0010179607],"domain_scores_gemma":[0.99806094,0.00060905225,0.00012474367,0.00074842223,0.00009289626,0.00036397335],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0041516963,0.00081875524,0.00074006163,0.0006640994,0.0005616052,0.00020392243,0.00037282056,0.00034286507,0.0016629512],"category_scores_gemma":[0.0001533146,0.0008542137,0.00016013841,0.00086168054,0.00018463026,0.00038746337,0.00036644313,0.00049306883,0.000015960615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.011600084,0.0013921274,0.007550821,0.006038598,0.006148924,0.00019302097,0.004510531,0.2912535,0.42879075,0.0067785666,0.18792877,0.047814306],"study_design_scores_gemma":[0.0031319219,0.00032362435,0.025890362,0.0012242125,0.00053305965,0.000010730986,0.00025446495,0.62487954,0.25950098,0.00083881745,0.08215759,0.0012547103],"about_ca_topic_score_codex":0.00018999202,"about_ca_topic_score_gemma":0.000026009066,"teacher_disagreement_score":0.6910043,"about_ca_system_score_codex":0.00092989847,"about_ca_system_score_gemma":0.00011344092,"threshold_uncertainty_score":0.99939084},"labels":[],"label_agreement":null},{"id":"W4416342975","doi":"10.1109/epec65543.2025.11230403","title":"Modeling and Estimation of the State of Charge of Electric Water Heater Tanks for Demand Response: A Kalman filter-Based Approach","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Natural Resources Canada","funders":"","keywords":"Kalman filter; State of charge; Extended Kalman filter; Discretization; Nonlinear system; Control theory (sociology); Invariant extended Kalman filter; Thermal; State (computer science)","score_opus":0.010707310323022835,"score_gpt":0.21595194240614424,"score_spread":0.2052446320831214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416342975","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49365172,0.00015687349,0.5052683,0.00010932674,0.0001043168,0.0005024619,0.000010706053,0.000014066617,0.00018227179],"genre_scores_gemma":[0.99253654,0.00002378097,0.0064325724,0.00003249891,0.000008829938,0.000084764615,0.000011152677,0.000029972112,0.0008398684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998298,0.000107495514,0.0007806159,0.00027421679,0.00020604584,0.00033363592],"domain_scores_gemma":[0.99919903,0.00012290252,0.000080329206,0.00046095302,0.000106380045,0.000030402609],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009079589,0.00024129123,0.00042534643,0.00041377157,0.00005730301,0.000017104612,0.00020311006,0.000081847385,0.000019875199],"category_scores_gemma":[0.000048578113,0.0001654251,0.0001302532,0.0003630228,0.000047492133,0.000095079835,0.00010634194,0.00009576611,3.046663e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007435674,0.00008530739,0.00006549023,0.0021999306,0.00020782159,1.0207625e-7,0.00038062155,0.9351354,0.059766494,0.0003110367,0.00007786609,0.0010263135],"study_design_scores_gemma":[0.0007789304,0.00008035106,0.00018411606,0.000115957264,0.00011554643,1.822977e-7,0.000012486035,0.609238,0.38915697,0.00020514123,0.000020055228,0.00009225976],"about_ca_topic_score_codex":0.0000550779,"about_ca_topic_score_gemma":0.0000032382243,"teacher_disagreement_score":0.49888483,"about_ca_system_score_codex":0.00006232073,"about_ca_system_score_gemma":0.000040479437,"threshold_uncertainty_score":0.674584},"labels":[],"label_agreement":null},{"id":"W4416429257","doi":"10.1109/thms.2025.3627893","title":"Adaptive Weighted Federated Domain Adaptation Methods for Nonintrusive Load Monitoring","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Human-Machine Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Weighting; Scalability; Adaptation (eye); Domain (mathematical analysis); Context (archaeology); Similarity (geometry); Raw data; Coding (social sciences); Similarity measure","score_opus":0.03830626402564625,"score_gpt":0.3343307092553955,"score_spread":0.29602444522974924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416429257","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019767699,0.0030729454,0.95887744,0.0001163002,0.02531357,0.0035588492,0.00022889636,0.00083977,0.006015458],"genre_scores_gemma":[0.95724607,0.0002351612,0.034110267,0.000027725924,0.00072402897,0.0025717008,0.00003936566,0.0002464676,0.0047992156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9944786,0.00085950975,0.0017577901,0.0012381789,0.000608388,0.0010575791],"domain_scores_gemma":[0.9967715,0.0010573654,0.00035215035,0.0009034184,0.0006653522,0.0002502028],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0014773471,0.0011740951,0.0012653015,0.0011899661,0.0018598794,0.00054135174,0.0005140898,0.00054437714,0.00007601449],"category_scores_gemma":[0.000021937305,0.0013331033,0.0005920604,0.0013879893,0.000113055066,0.00047088868,0.000007994761,0.000992888,0.000056075212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038493288,0.00033072947,0.000005877738,0.0009083496,0.0030052194,0.0000114296345,0.0014897925,0.95992786,0.0058656107,0.0045986483,0.00018755037,0.023284005],"study_design_scores_gemma":[0.003747561,0.00055272056,0.000055747896,0.0016627726,0.0009058658,0.000006548039,0.0033249606,0.9549519,0.025848204,0.00047410763,0.0073448243,0.0011248082],"about_ca_topic_score_codex":0.0023620802,"about_ca_topic_score_gemma":0.00046118553,"teacher_disagreement_score":0.9552693,"about_ca_system_score_codex":0.0029989318,"about_ca_system_score_gemma":0.00024097593,"threshold_uncertainty_score":0.99943954},"labels":[],"label_agreement":null},{"id":"W4416436949","doi":"10.1016/j.epsr.2025.112502","title":"Smart contract-driven trading in a wholesale electricity market with multi-aggregator coordination in a Private Blockchain platform based on Ethereum","year":2025,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Blockchain; Database transaction; Smart contract; Cryptocurrency; Electricity; Demand response; Electricity market; Hash function; Renewable energy","score_opus":0.020087408871530096,"score_gpt":0.27271214194548205,"score_spread":0.25262473307395195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416436949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9639811,0.0008927326,0.018254908,0.00025589016,0.0003611614,0.0023196142,0.0000049726063,0.0002923924,0.013637234],"genre_scores_gemma":[0.99776095,0.000022185377,0.00009306337,0.000029874212,0.000027218453,0.0006602931,0.000005401266,0.00006454598,0.0013364544],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996469,0.0004529634,0.00053906057,0.0005219158,0.00084119744,0.0011758631],"domain_scores_gemma":[0.99862367,0.00060008076,0.00005694602,0.0004900139,0.00011492703,0.00011435273],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.003029792,0.00031120653,0.0004616081,0.0032990458,0.00010217948,0.0001348941,0.0004460108,0.00021145771,0.000021509577],"category_scores_gemma":[0.00027240947,0.00029822378,0.000049848146,0.005101707,0.0000333649,0.00011512255,0.00004160494,0.0011449377,0.000014146971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014898274,0.0012739945,0.09394344,0.0015012049,0.0003867948,0.0006821801,0.0007298306,0.86033624,0.017673377,0.0033029974,0.01442562,0.004254493],"study_design_scores_gemma":[0.0027840484,0.00023227192,0.034104213,0.00079495326,0.0000052083155,0.00000331547,0.000053273103,0.9565991,0.0019446873,0.0000120505,0.003190473,0.0002763949],"about_ca_topic_score_codex":0.0008354992,"about_ca_topic_score_gemma":0.00064486114,"teacher_disagreement_score":0.09626287,"about_ca_system_score_codex":0.0021779523,"about_ca_system_score_gemma":0.00019261631,"threshold_uncertainty_score":0.999947},"labels":[],"label_agreement":null},{"id":"W4416525759","doi":"10.1016/b978-0-443-36459-4.00016-6","title":"Emerging trends: Artificial intelligence, deep learning, big data, and the role of digital twins applied to energy communities","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Big data; Scalability; Renewable energy; Electricity; Energy consumption; Efficient energy use; Energy (signal processing); Reinforcement learning","score_opus":0.01739317172312559,"score_gpt":0.21286261331840714,"score_spread":0.19546944159528154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416525759","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001827647,0.0017305264,0.002866366,0.000023780136,0.0004471486,0.00014527449,0.00005150549,0.00015449764,0.9945626],"genre_scores_gemma":[0.18600911,0.0007285069,0.00018841389,0.00011247165,0.0007260523,0.00010545913,0.00040880695,0.00017125638,0.8115499],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865395,0.000022163782,0.0005358205,0.00027126775,0.00025622186,0.0002605775],"domain_scores_gemma":[0.9986232,0.00015674035,0.00010114604,0.001021067,0.00003274297,0.000065116124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020933164,0.0004059349,0.00054273295,0.0004661286,0.00012496562,0.00012179553,0.0008042518,0.00013604976,0.00004665663],"category_scores_gemma":[0.000010171586,0.00035576278,0.00009776852,0.000051326388,0.00022015459,0.000042943702,0.001070954,0.0003975961,0.000011646831],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000203721,0.000003137464,0.0000016687176,0.000047125617,0.000280705,0.0000013477816,0.000874842,0.011295627,0.0000023013847,0.11636449,0.000069097536,0.8710393],"study_design_scores_gemma":[0.00007853635,0.000015764084,0.0000012233796,0.00013997854,0.00013843147,0.0000010554662,0.0007436623,0.013796717,0.00007697935,0.010995035,0.97368723,0.0003253632],"about_ca_topic_score_codex":0.0000095446885,"about_ca_topic_score_gemma":0.00046075147,"teacher_disagreement_score":0.97361815,"about_ca_system_score_codex":0.000041883522,"about_ca_system_score_gemma":0.000014994152,"threshold_uncertainty_score":0.99988943},"labels":[],"label_agreement":null},{"id":"W4416704827","doi":"10.26868/25222708.2025.1274","title":"Case study of residential energy management systems with solar PV, wind and battery energy storage","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund","keywords":"Energy management; Renewable energy; Model predictive control; Energy management system; Energy consumption; Demand response; Efficient energy use; Work (physics); Control (management)","score_opus":0.015106665608649168,"score_gpt":0.23698643181677367,"score_spread":0.2218797662081245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7312391,0.00034931858,0.26506662,0.00003826795,0.0008448212,0.0006490708,0.0000046459463,0.00018177506,0.0016264154],"genre_scores_gemma":[0.9977908,0.00015117058,0.0005558792,0.00003511173,0.00021187664,0.00010818806,0.0000049074424,0.00009312809,0.0010489428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99621207,0.00006384451,0.0012035546,0.0011100718,0.00076400343,0.0006464541],"domain_scores_gemma":[0.9981181,0.00016197588,0.00046347704,0.0004331957,0.00065195403,0.00017129871],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005099777,0.00074216886,0.000823361,0.0013232396,0.0003995143,0.0007693229,0.00040202617,0.00022991409,0.00002975074],"category_scores_gemma":[0.000032982643,0.00081198546,0.00006948848,0.0011201361,0.00012215537,0.0008129466,0.00054858666,0.00025252486,7.549872e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017023743,0.0002790976,0.005989575,0.0017858796,0.0012938222,0.0005889662,0.0021213517,0.9478613,0.00025884985,0.036202643,0.00020094214,0.0032473283],"study_design_scores_gemma":[0.0031736651,0.00043332306,0.0020540566,0.0014577411,0.000963884,0.00010456063,0.013700264,0.97489864,0.00041744302,0.00018770268,0.0018443427,0.0007643592],"about_ca_topic_score_codex":0.0019775473,"about_ca_topic_score_gemma":0.00008511116,"teacher_disagreement_score":0.26655173,"about_ca_system_score_codex":0.0002834581,"about_ca_system_score_gemma":0.00006107235,"threshold_uncertainty_score":0.9994331},"labels":[],"label_agreement":null},{"id":"W4416704856","doi":"10.26868/25222708.2025.1489","title":"Investigating the full potential of demand response programs using granular occupancy schedules","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Occupancy; Thermostat; Demand response; Energy consumption; Reliability (semiconductor); Consumption (sociology); Demand patterns; Peak demand; Schedule","score_opus":0.02912049586779224,"score_gpt":0.28285674101332453,"score_spread":0.2537362451455323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6678127,0.0004556726,0.32955286,0.00030419524,0.0006989489,0.00079259416,0.0000037241286,0.00020495457,0.00017436036],"genre_scores_gemma":[0.97452503,0.00004449323,0.024954982,0.000054752414,0.00022626285,0.000054646258,0.0000059276526,0.000072361865,0.00006153472],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962092,0.000116544616,0.0013793972,0.0007627197,0.0007437616,0.0007883822],"domain_scores_gemma":[0.9974394,0.00033541248,0.00060226995,0.00040685292,0.0010724281,0.00014364674],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020576061,0.000646271,0.00063829566,0.000654181,0.0006634118,0.00069738313,0.00079227204,0.00033738004,0.00003569644],"category_scores_gemma":[0.0012373384,0.0006240559,0.00022957576,0.0017868578,0.0004352597,0.0007510376,0.00046868992,0.00055943883,0.000003840238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023988291,0.000058057096,0.01592249,0.0009968288,0.00023431944,0.0000015313368,0.0010473612,0.84895843,0.09515052,0.033692945,0.00001592279,0.0036816902],"study_design_scores_gemma":[0.0009124825,0.00009780522,0.009317911,0.002548692,0.00045998083,0.000003029216,0.0011942395,0.966714,0.011488932,0.006225423,0.00051808293,0.00051937014],"about_ca_topic_score_codex":0.00006184226,"about_ca_topic_score_gemma":0.000002607565,"teacher_disagreement_score":0.30671236,"about_ca_system_score_codex":0.00027876894,"about_ca_system_score_gemma":0.00027245432,"threshold_uncertainty_score":0.9996211},"labels":[],"label_agreement":null},{"id":"W4416704924","doi":"10.26868/25222708.2025.1351","title":"Modelling the impact of occupant behaviour on direct load control of HVAC systems","year":2025,"lang":"","type":"article","venue":"Building Simulation Conference proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; Ministry of Colleges and Universities","keywords":"Thermostat; HVAC; Demand response; Robustness (evolution); Electricity; Python (programming language); Economizer; Load profile","score_opus":0.025513586704553625,"score_gpt":0.286436547522543,"score_spread":0.2609229608179894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416704924","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7002832,0.0006197302,0.29055429,0.000055007433,0.0008149883,0.0011025944,0.000044470227,0.00014131507,0.0063844053],"genre_scores_gemma":[0.9991844,0.00011010033,0.00019258863,0.000009269934,0.00013928273,0.0000669354,0.0000032855492,0.000056027482,0.00023807558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99661076,0.000044870067,0.0013955887,0.0005860627,0.00078099384,0.00058171776],"domain_scores_gemma":[0.9966529,0.0005865629,0.00070385635,0.0004182085,0.0015409266,0.00009754444],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011364282,0.00059723295,0.0009592875,0.0005403734,0.00018916502,0.0002449424,0.00066529016,0.00025978035,0.00003650468],"category_scores_gemma":[0.00031147347,0.00048979704,0.00038417947,0.00093756104,0.00012916376,0.00034787526,0.00012780451,0.00040213572,0.000003836492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022875537,0.00011041499,0.014652948,0.000644895,0.0006108013,5.8428e-7,0.00088848924,0.9512615,0.0021544874,0.028995208,0.0001264762,0.00032539188],"study_design_scores_gemma":[0.0012116769,0.00021115287,0.003446944,0.0022629662,0.00040573123,5.0123873e-7,0.0003910617,0.9889422,0.0022934098,0.00036259703,0.00010357461,0.00036818744],"about_ca_topic_score_codex":0.0018609506,"about_ca_topic_score_gemma":0.0000014315625,"teacher_disagreement_score":0.29890123,"about_ca_system_score_codex":0.00068491185,"about_ca_system_score_gemma":0.00027549296,"threshold_uncertainty_score":0.9997554},"labels":[],"label_agreement":null},{"id":"W4416743012","doi":"10.1088/1742-6596/3140/6/062010","title":"Integrating Building Performance Simulation in Agent-based Models to Support Demand-side Management Strategies","year":2025,"lang":"","type":"article","venue":"Journal of Physics Conference Series","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Canada Research Chairs","keywords":"Setpoint; Renewable energy; Photovoltaic system; Energy management; Demand response; Building energy simulation; Tariff; Efficient energy use; Key (lock); Workflow","score_opus":0.029657047923466445,"score_gpt":0.2693091309536252,"score_spread":0.23965208303015875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416743012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19244184,0.00007776917,0.7936004,0.00019732819,0.001167855,0.000305159,0.0000033524968,0.00003759336,0.01216871],"genre_scores_gemma":[0.98163307,0.00028088072,0.017431865,0.0001070269,0.00019603426,0.000021884141,0.000004525376,0.000039166178,0.00028552982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971177,0.00008603321,0.0013593739,0.00031839384,0.000558433,0.0005600799],"domain_scores_gemma":[0.9986003,0.00010154432,0.00040559558,0.00036145464,0.0004091617,0.000121944824],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006655385,0.00049026014,0.00068097404,0.0007170398,0.0001410922,0.0005331074,0.0005718361,0.000102855316,0.00003316062],"category_scores_gemma":[0.000022193333,0.00052118994,0.00017565559,0.000983078,0.00006599909,0.002624634,0.0002053618,0.0005341532,0.000006072627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013444318,0.000069847265,0.00023715402,0.0007729986,0.00020563473,0.000038366063,0.0010746891,0.78594863,0.0010661861,0.1229497,0.000050581126,0.08745177],"study_design_scores_gemma":[0.0009385623,0.00038203513,0.0016171975,0.0030345214,0.00017421927,0.0000017916161,0.0049091093,0.94763404,0.02652341,0.013647154,0.0006651281,0.00047285305],"about_ca_topic_score_codex":0.000034659504,"about_ca_topic_score_gemma":0.00008482739,"teacher_disagreement_score":0.78919125,"about_ca_system_score_codex":0.0005093824,"about_ca_system_score_gemma":0.0003516968,"threshold_uncertainty_score":0.999724},"labels":[],"label_agreement":null},{"id":"W4416759722","doi":"10.35833/mpce.2025.000807","title":"Smart Grid Origins, Definitions, Technologies, and Emerging Trends: A Power Community Perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Panacea (medicine); Smart grid; Perspective (graphical); Term (time); Electricity; Power grid","score_opus":0.015236522179596652,"score_gpt":0.22101395572892477,"score_spread":0.20577743354932812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416759722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47201607,0.26620474,0.18153813,0.0019445829,0.014038587,0.00018253566,0.00010039143,0.002068674,0.06190628],"genre_scores_gemma":[0.9959136,0.0036364375,0.00011329542,0.000025483074,0.000101715574,0.0000069721946,0.0000025600143,0.000048846392,0.00015108449],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988984,0.000076621036,0.0004126505,0.0001462587,0.00022735172,0.00023874783],"domain_scores_gemma":[0.99944687,0.00006969165,0.00007764743,0.00024011475,0.00007885498,0.00008679722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003712056,0.00022282852,0.0003249785,0.0005251085,0.00013616901,0.00019647194,0.00017695359,0.00010679127,0.000011177152],"category_scores_gemma":[0.000017547176,0.0001908616,0.00008908937,0.00024864063,0.00006459441,0.00028794655,0.00009673405,0.00045696966,0.0000013632165],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089930494,0.00024698817,0.00052951655,0.0006393839,0.0032561119,0.00087991124,0.009358172,0.09761495,0.0011344312,0.7081644,0.0796373,0.09844889],"study_design_scores_gemma":[0.001284582,0.0007107049,0.0016356362,0.0016033272,0.00029859366,0.0021620558,0.057082597,0.093987994,0.00042906738,0.010199373,0.82952034,0.0010857057],"about_ca_topic_score_codex":0.0003760164,"about_ca_topic_score_gemma":0.00016165413,"teacher_disagreement_score":0.74988306,"about_ca_system_score_codex":0.00024983005,"about_ca_system_score_gemma":0.00001944615,"threshold_uncertainty_score":0.778311},"labels":[],"label_agreement":null},{"id":"W4416799821","doi":"10.1109/snpd65828.2025.11252948","title":"Peer-to-Peer Energy Trading in a Local Energy Market Using Quantum Reinforcement Learning","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Algoma University; Thompson Rivers University","funders":"","keywords":"Reinforcement learning; Renewable energy; Electricity; Energy (signal processing); Energy market; Photovoltaic system; Energy consumption; Distributed generation","score_opus":0.011821009846292262,"score_gpt":0.23003282949221232,"score_spread":0.21821181964592007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416799821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004503831,0.00045391952,0.77624375,0.0015691558,0.0032747653,0.00019591663,0.0000013003747,0.00034181235,0.21341555],"genre_scores_gemma":[0.84014827,0.00018774006,0.0018426845,0.0009374336,0.00030479717,0.00009586075,0.000023668366,0.00015261778,0.1563069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99334675,0.00027213342,0.001737777,0.001200021,0.0015118432,0.0019314981],"domain_scores_gemma":[0.9980065,0.0002688226,0.00013767477,0.0008845404,0.0002861765,0.000416234],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0016582058,0.0010460212,0.0010044232,0.0023950266,0.00031023263,0.0003585185,0.00076047605,0.00042503598,0.0025510578],"category_scores_gemma":[0.00028964967,0.0012675163,0.00031504585,0.0028757253,0.00009211344,0.00043910596,0.0008347981,0.00068573345,0.000025648236],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001157154,0.00007325394,0.0003064997,0.00017707134,0.00040423614,0.000108042805,0.00038132712,0.8501273,0.00049681263,0.10023924,0.030575758,0.016994795],"study_design_scores_gemma":[0.000915184,0.000085611886,0.00018718309,0.0004941677,0.000091144284,0.000004538111,0.0010447972,0.6442131,0.002157542,0.00023242664,0.34980288,0.00077144883],"about_ca_topic_score_codex":0.00893776,"about_ca_topic_score_gemma":0.0013589512,"teacher_disagreement_score":0.8356445,"about_ca_system_score_codex":0.0027388902,"about_ca_system_score_gemma":0.00019758398,"threshold_uncertainty_score":0.9989775},"labels":[],"label_agreement":null},{"id":"W4416799870","doi":"10.1109/snpd65828.2025.11253849","title":"Peer-to-Peer Renewable Energy Trading Using Agent-Based Modelling","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Algoma University; University of Ottawa","funders":"","keywords":"Renewable energy; Work (physics); Matching (statistics); Grid; Electricity; Distributed generation; Photovoltaic system; Key (lock); Solar energy","score_opus":0.03066866312993615,"score_gpt":0.23984324155441789,"score_spread":0.20917457842448173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416799870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004636851,0.0004918281,0.84898144,0.0019903537,0.005023191,0.00025177852,0.00000792263,0.00056997006,0.13804665],"genre_scores_gemma":[0.7776937,0.00003720717,0.08477069,0.001460744,0.00049034687,0.00005175133,0.000028746483,0.00018134392,0.1352855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.995089,0.00008926254,0.0010574271,0.0010709646,0.0012310261,0.0014623313],"domain_scores_gemma":[0.99777323,0.00015217644,0.00008424573,0.0011770623,0.00040606328,0.00040723706],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009126627,0.00083840766,0.0007196585,0.001378554,0.0004206199,0.00048468637,0.0007263201,0.0003197996,0.0009970505],"category_scores_gemma":[0.000086528424,0.001026833,0.00035062808,0.0021359362,0.0000428451,0.00033119577,0.00029148508,0.00029815678,0.00005100986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003115219,0.00008371895,0.000058407204,0.00022149067,0.00039777288,0.000032185133,0.0001330623,0.9333295,0.002467013,0.006968032,0.054766223,0.0015114327],"study_design_scores_gemma":[0.0006237466,0.000026159787,0.0000049629957,0.0003320141,0.00022460693,8.769566e-7,0.00017371231,0.72577715,0.025095515,0.00034815323,0.24669516,0.0006979108],"about_ca_topic_score_codex":0.009917737,"about_ca_topic_score_gemma":0.0005132447,"teacher_disagreement_score":0.7730568,"about_ca_system_score_codex":0.0013331954,"about_ca_system_score_gemma":0.00019844047,"threshold_uncertainty_score":0.9999162},"labels":[],"label_agreement":null},{"id":"W4416873307","doi":"10.1109/icdcsw63273.2025.00105","title":"A Federated Learning Approach with Spiking Neurons and Clustering for Smart Meter Data","year":2025,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Cluster analysis; Overhead (engineering); Big data; Transmission (telecommunications); Artificial neural network; Smart meter; Data aggregator; Consumption (sociology); Energy consumption","score_opus":0.0246726493018694,"score_gpt":0.22514987550600996,"score_spread":0.20047722620414055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416873307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018678287,0.000058310376,0.9382027,0.00007776403,0.0001508871,0.00022162967,0.0000016405592,0.00042398012,0.0421848],"genre_scores_gemma":[0.95713735,0.000015224688,0.04017667,0.00013858419,0.00004376903,0.00006817902,0.00006792625,0.000042075895,0.0023102493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935263,0.000011642836,0.00011226989,0.00026333708,0.000058089245,0.00020205237],"domain_scores_gemma":[0.99968255,0.00004459733,0.000010150116,0.00022181249,0.000012494399,0.000028399236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013185476,0.00012698359,0.00012517686,0.000093846174,0.00011225545,0.00014010574,0.00013013798,0.000027195561,0.0000051833717],"category_scores_gemma":[0.000018065379,0.00011065357,0.000010799445,0.0001462117,0.000012764291,0.00015687579,0.00024735692,0.00009652572,8.443199e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029412917,0.000014698254,0.0022086347,0.00039539233,0.0002735006,0.000003380542,0.00005218014,0.97884464,0.0006717731,0.00063711684,0.0039478377,0.012921458],"study_design_scores_gemma":[0.0003999705,0.000020211311,0.0009799594,0.000025919293,0.00004083273,0.0000025869108,0.00008508609,0.9661192,0.00019862983,0.000004763576,0.031995617,0.00012718095],"about_ca_topic_score_codex":0.000026669602,"about_ca_topic_score_gemma":0.000103252765,"teacher_disagreement_score":0.93845904,"about_ca_system_score_codex":0.000019289582,"about_ca_system_score_gemma":0.000005614966,"threshold_uncertainty_score":0.45123217},"labels":[],"label_agreement":null},{"id":"W4416966289","doi":"10.1016/j.erss.2025.104474","title":"Designing effective demand response: A review of behavioral insights, consumer engagement, and operational strategies in energy systems","year":2025,"lang":"en","type":"article","venue":"Energy Research & Social Science","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"University of Michigan","keywords":"Consumer behaviour; Consumption (sociology); Electrification; Psychological intervention; Demand response; Cognition; Population; Mains electricity; Consumer demand; Supply and demand","score_opus":0.042166440388394726,"score_gpt":0.36420250910360313,"score_spread":0.3220360687152084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416966289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63749224,0.2144132,0.071049824,0.00082960946,0.0018186887,0.0020002539,0.000019185003,0.00038210323,0.07199493],"genre_scores_gemma":[0.993242,0.0059678275,0.00013809635,0.000041634747,0.00003845246,0.00033603885,0.0000029090872,0.000009941547,0.00022309196],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972577,0.0009889379,0.0002934479,0.00031298812,0.00073212764,0.00041478127],"domain_scores_gemma":[0.99907655,0.00042810186,0.000028307262,0.00015836477,0.00023969228,0.00006896438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044792457,0.00012939611,0.00024456414,0.0005859394,0.00040398876,0.00016268504,0.0003392204,0.00005663693,0.0000098114315],"category_scores_gemma":[0.00018637716,0.00012480291,0.000026358068,0.0020442475,0.0007501473,0.00040159447,0.00025709666,0.00020730484,6.3403576e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001796327,0.00018184226,0.0015454212,0.0025693746,0.00012732545,0.00006549046,0.003182924,0.061298817,0.104730524,0.8066216,0.0060139867,0.013483071],"study_design_scores_gemma":[0.0055316696,0.0011708558,0.119198725,0.024958428,0.00019599537,0.000015083307,0.019919613,0.16940334,0.10602313,0.007534865,0.5431672,0.0028811106],"about_ca_topic_score_codex":0.0008697388,"about_ca_topic_score_gemma":0.00014674533,"teacher_disagreement_score":0.79908675,"about_ca_system_score_codex":0.00034181683,"about_ca_system_score_gemma":0.000370408,"threshold_uncertainty_score":0.5089315},"labels":[],"label_agreement":null},{"id":"W4417047210","doi":"10.1016/j.enbuild.2025.116793","title":"Socio-Demographic insights on urban building energy consumption","year":2025,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Hydro-Québec; Canada Excellence Research Chairs, Government of Canada","keywords":"Energy consumption; Consumption (sociology); Energy (signal processing); Efficient energy use; Urban heat island; Building energy simulation; Urban planning","score_opus":0.005173040698868448,"score_gpt":0.19389159409124068,"score_spread":0.18871855339237223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417047210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8851461,0.0064509655,0.07904848,0.00030763357,0.0019186493,0.000061238774,0.000002259358,0.0010517678,0.026012896],"genre_scores_gemma":[0.99492794,0.0023471627,0.0005867921,0.00075152196,0.000194808,0.000039361894,0.000009667042,0.00003335887,0.0011094119],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.998974,0.000027591963,0.00022014098,0.00032764283,0.00014963264,0.0003009667],"domain_scores_gemma":[0.99956006,0.00008096484,0.000030446612,0.0002324827,0.00001885829,0.00007720708],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008280964,0.00025494775,0.00020878867,0.00048499013,0.0001897147,0.00006907229,0.00016012628,0.0001491638,0.00003153655],"category_scores_gemma":[0.000008904226,0.0002571589,0.0000737645,0.0003223643,0.000077346616,0.00013809156,0.00007969099,0.000112652575,0.00000286305],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016176764,0.000026173675,0.001221354,0.000045361714,0.00017393257,0.000007631125,0.000073309006,0.029549433,0.006535919,0.9288166,0.02357766,0.009956438],"study_design_scores_gemma":[0.000562799,0.00004379662,0.0030030822,0.0001815314,0.000055975797,0.0000026198766,0.000030038269,0.011625182,0.025701081,0.007704721,0.9506545,0.00043469],"about_ca_topic_score_codex":0.00006989083,"about_ca_topic_score_gemma":0.000028606579,"teacher_disagreement_score":0.9270768,"about_ca_system_score_codex":0.00007380236,"about_ca_system_score_gemma":0.000007059044,"threshold_uncertainty_score":0.9999881},"labels":[],"label_agreement":null},{"id":"W4417122330","doi":"10.3390/en18246424","title":"An Equilibrium Analysis of Time-Varying and Flat Electricity Rates","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Dalhousie University","funders":"","keywords":"Tariff; Electricity; Consumption (sociology); Service (business); Value (mathematics); Electricity price; Service provider; Electricity market","score_opus":0.0045470712094060955,"score_gpt":0.22066624954097205,"score_spread":0.21611917833156596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417122330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9909138,0.0009611829,0.0013447253,0.000019384637,0.000098999895,0.000025643261,0.0000017763011,0.00020239336,0.006432081],"genre_scores_gemma":[0.9990235,0.00011124836,0.0003862521,0.000022082282,0.000022663164,0.0000063659577,0.000013020911,0.00000991738,0.00040496155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994891,0.00001838961,0.00014655715,0.00013059202,0.000074048134,0.0001412891],"domain_scores_gemma":[0.99968064,0.00004417582,0.000016266484,0.0002174288,0.000018432207,0.00002306503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000083616134,0.00009885442,0.00021118934,0.0004589173,0.000021771286,0.000028262788,0.00010602785,0.00003385732,0.000028652237],"category_scores_gemma":[0.000011519785,0.00010078467,0.000045893354,0.00096402416,0.000023641622,0.0001236999,0.00004642208,0.000039231996,0.0000015992522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033877943,0.0000049852956,0.002425784,0.000026878724,0.0006096266,7.9327253e-7,0.000042366773,0.8925753,0.10225487,0.0007896236,0.00043421544,0.0008321269],"study_design_scores_gemma":[0.00008460886,0.000009550881,0.008905677,0.000009658092,0.0003182797,7.605482e-8,0.00001710498,0.7455738,0.24410582,0.00007655448,0.00079953426,0.000099335826],"about_ca_topic_score_codex":0.000061012255,"about_ca_topic_score_gemma":0.000017728304,"teacher_disagreement_score":0.14700155,"about_ca_system_score_codex":0.000022972104,"about_ca_system_score_gemma":0.00000523944,"threshold_uncertainty_score":0.41098797},"labels":[],"label_agreement":null},{"id":"W4417164449","doi":"10.1080/23744731.2025.2593799","title":"Grey-box models of chiller evaporator for practical integration in building automation systems","year":2025,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; École de Technologie Supérieure","funders":"","keywords":"Chiller; Evaporator; Water chiller; Chiller boiler system; Building automation; Automation; System integration","score_opus":0.013403600343124615,"score_gpt":0.2482954990842272,"score_spread":0.23489189874110258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417164449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22151981,0.00042221157,0.7745447,0.0021028852,0.00031362227,0.00086791464,0.000004015006,0.0000839343,0.00014090638],"genre_scores_gemma":[0.99127865,0.00010812591,0.008101392,0.000012609717,0.000008693571,0.00045720767,0.0000011049046,0.0000054294846,0.000026781294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993797,0.0000041352255,0.0001754969,0.00016457133,0.000119760065,0.00015633383],"domain_scores_gemma":[0.9996524,0.00006376175,0.00003598274,0.00021741175,0.000019450077,0.0000109935045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006039197,0.00007340363,0.000098127115,0.00030588915,0.00009396782,0.00001831881,0.00017388798,0.000063748936,5.464074e-7],"category_scores_gemma":[0.00008851995,0.000055587734,0.0000136161125,0.00034041147,0.00025006724,0.00017273317,0.00007419353,0.00005777552,3.2797976e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073753504,0.0000257583,0.00015706434,0.00006279547,0.000022135468,2.1645984e-7,0.00005248729,0.54978496,0.033238754,0.39868188,0.00018788243,0.017778663],"study_design_scores_gemma":[0.00021678957,0.00003269577,0.00046162223,0.000037412243,0.00001788133,8.782214e-7,0.00025395266,0.955195,0.02761686,0.013762304,0.0023470444,0.000057562986],"about_ca_topic_score_codex":0.000006224477,"about_ca_topic_score_gemma":0.000003744414,"teacher_disagreement_score":0.7697588,"about_ca_system_score_codex":0.0001371303,"about_ca_system_score_gemma":0.000021038071,"threshold_uncertainty_score":0.22668019},"labels":[],"label_agreement":null},{"id":"W4417169342","doi":"10.1109/naps66256.2025.11272255","title":"Estimating Probabilistic Load Coincidence Factors for Distribution System Operation","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Coincidence; Probabilistic logic; Complement (music); Set (abstract data type); Gaussian; Statistical model; Probability distribution; Random variable","score_opus":0.012279151616920538,"score_gpt":0.23686688283190857,"score_spread":0.22458773121498804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417169342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034974705,0.000179132,0.95203084,0.0001503461,0.0055413195,0.0016467688,0.00006449443,0.00060746464,0.004804907],"genre_scores_gemma":[0.9863683,0.0000046203136,0.011314576,0.000019309224,0.00021540928,0.00037078522,0.0002391979,0.000032339052,0.0014354929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978542,0.00004483471,0.0007581263,0.0005147803,0.00033838148,0.0004897306],"domain_scores_gemma":[0.9987554,0.00034824986,0.000086343134,0.00046524496,0.0002624684,0.00008229345],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005863705,0.0003808786,0.0003638988,0.000082777726,0.0003533422,0.0003399334,0.00029262723,0.00015438761,0.00004160376],"category_scores_gemma":[0.0007898319,0.00038809385,0.0001241907,0.00039213424,0.000040820527,0.0003374395,0.000139838,0.00013047809,0.000033170367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001038522,0.000024490797,0.0002609436,0.0030192106,0.00010502404,0.0000016506599,0.000088187626,0.8622117,0.0001576157,0.1300991,0.0030075936,0.0010140812],"study_design_scores_gemma":[0.00044219632,0.000049958177,0.0015398284,0.0008692022,0.00020696725,0.0000014923874,0.00045028166,0.9919684,0.0018535524,0.0001623292,0.0021187777,0.00033705065],"about_ca_topic_score_codex":0.00023162333,"about_ca_topic_score_gemma":0.00009587394,"teacher_disagreement_score":0.95139354,"about_ca_system_score_codex":0.0032996258,"about_ca_system_score_gemma":0.00017006765,"threshold_uncertainty_score":0.99985707},"labels":[],"label_agreement":null},{"id":"W4417336903","doi":"10.1109/access.2025.3644794","title":"Balancing Efficiency and Longevity in Community Energy Storage Systems Using Predictive Scheduling","year":2025,"lang":"","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renewable energy; Maximization; Scheduling (production processes); Energy storage; Capacity optimization; Electric power system; Peaking power plant; Efficient energy use","score_opus":0.02037745862821451,"score_gpt":0.2720790881424049,"score_spread":0.2517016295141904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417336903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59127694,0.0039911224,0.39808667,0.000012692482,0.004350316,0.0002490294,0.000009214062,0.0001192126,0.0019047995],"genre_scores_gemma":[0.9988523,0.00049518346,0.00015611821,0.000061182494,0.00026020358,0.000050360926,0.0000049855066,0.000057636233,0.00006204005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969305,0.0006431291,0.0008066333,0.00052401796,0.00034112114,0.0007546463],"domain_scores_gemma":[0.99830943,0.00042657452,0.0001637414,0.00086440897,0.00010042564,0.00013542929],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013565515,0.0005104715,0.00070047425,0.00083142205,0.00051062065,0.0006259437,0.00094953657,0.00027251942,0.000007365115],"category_scores_gemma":[0.0001261063,0.00062249525,0.000072999814,0.001579396,0.00013982727,0.00096855755,0.00085664424,0.0009607408,0.0000013439217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029357378,0.00013663186,0.021340895,0.0014170827,0.00017730733,0.00003871558,0.0005886418,0.97402924,0.00071670074,0.00063676125,0.000039421888,0.0008492687],"study_design_scores_gemma":[0.00079691317,0.00003387449,0.020863557,0.0022189468,0.00012729288,0.0000044601948,0.0009515503,0.97317606,0.0011474153,0.00007750463,0.0001494047,0.00045303226],"about_ca_topic_score_codex":0.014889762,"about_ca_topic_score_gemma":0.0011464201,"teacher_disagreement_score":0.40757534,"about_ca_system_score_codex":0.0011111755,"about_ca_system_score_gemma":0.00010957752,"threshold_uncertainty_score":0.99962264},"labels":[],"label_agreement":null},{"id":"W4417525376","doi":"10.1007/978-981-95-1826-5_52","title":"Unlocking the Potential of Solar Renewable Energy Communities in an Urban District in Bari, Italy","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Medical Association","funders":"","keywords":"Renewable energy; Occupancy; Incentive; Photovoltaic system; Revenue; Matching (statistics); Incentive program; Electricity; Feed-in tariff","score_opus":0.00623272153066279,"score_gpt":0.17403689951589107,"score_spread":0.1678041779852283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417525376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047474178,0.016586656,0.8704507,0.000118581826,0.0035219267,0.00072904944,0.00008945008,0.0007688024,0.10298746],"genre_scores_gemma":[0.99784976,0.0005523538,0.0004082085,0.00003604109,0.00020467099,0.000043266897,0.0001352805,0.00014022054,0.0006302117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982432,0.000034195968,0.0006716595,0.00028059338,0.0002778123,0.00049251],"domain_scores_gemma":[0.9987017,0.00034893813,0.00006978941,0.00080830156,0.000028045553,0.000043211956],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028023872,0.0005602282,0.0006384922,0.0010794102,0.00003415947,0.00005445771,0.00068613,0.00043127782,0.000058054055],"category_scores_gemma":[0.000046574096,0.00056325126,0.00012440908,0.00035079152,0.000044663124,0.00012932692,0.00024264857,0.0009918404,6.053158e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073950673,0.00001348668,0.0002979201,0.00030506495,0.000070589784,0.00004635574,0.00030927177,0.9948355,0.00019830816,0.0024236054,0.00008971349,0.0014028077],"study_design_scores_gemma":[0.00046842912,0.000037398666,0.0007046087,0.0017535673,0.000052897514,0.0000042646793,0.000037235,0.97810274,0.0009318722,0.0017724577,0.0153675005,0.000767031],"about_ca_topic_score_codex":0.0023463878,"about_ca_topic_score_gemma":0.053317007,"teacher_disagreement_score":0.9931023,"about_ca_system_score_codex":0.0004355374,"about_ca_system_score_gemma":0.00003498112,"threshold_uncertainty_score":0.9996819},"labels":[],"label_agreement":null},{"id":"W581861897","doi":"","title":"Demand Response: An analysis of potential and opportunities in Energy Pool’s targeted markets","year":2013,"lang":"en","type":"dissertation","venue":"Utrecht University Repository (Utrecht University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Natural resource economics; Economics; Business; Engineering; Electricity; Electrical engineering","score_opus":0.006433777693228041,"score_gpt":0.16248102284489632,"score_spread":0.1560472451516683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W581861897","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95979893,0.00038475392,0.0006666582,0.00002057562,0.00077757915,0.00018804886,0.000059418504,0.00027257612,0.037831455],"genre_scores_gemma":[0.8741152,0.0019164281,0.000168242,0.000008147598,0.00004430536,6.7048717e-7,0.0007826884,0.00005560514,0.12290871],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9976545,0.00054804684,0.0003645289,0.0006418074,0.00038039146,0.00041071646],"domain_scores_gemma":[0.9985606,0.00012872835,0.00025626054,0.00061029574,0.00017628499,0.0002678449],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025260562,0.0004991167,0.0008266187,0.0048470227,0.00019286116,0.00004530457,0.00060153997,0.00062497257,0.00017152246],"category_scores_gemma":[0.0000109613275,0.0006926771,0.00026669286,0.0014696899,0.00012990613,0.00063152355,0.00013529415,0.00033918401,0.0000014980943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.018769836,0.0017873739,0.010300695,0.002427939,0.040307533,0.028221505,0.011161994,0.768039,0.047744848,0.01780357,0.015800292,0.037635397],"study_design_scores_gemma":[0.0065854504,0.0006662863,0.33561397,0.00089439424,0.020803917,0.0000549145,0.077560104,0.3077509,0.022311602,0.00007553188,0.22244231,0.0052406066],"about_ca_topic_score_codex":0.0015149118,"about_ca_topic_score_gemma":0.0012315247,"teacher_disagreement_score":0.4602881,"about_ca_system_score_codex":0.00070765545,"about_ca_system_score_gemma":0.0001586023,"threshold_uncertainty_score":0.9995524},"labels":[],"label_agreement":null},{"id":"W6888852600","doi":"10.25316/ir-12641","title":"The Nanaimo Free Press [Tuesday, December 18, 1888]","year":2019,"lang":"en","type":"other","venue":"VIUSpace (Vancouver Island University Library)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Free press; Free enterprise; Gloom","score_opus":0.005713499435194328,"score_gpt":0.1618144042314531,"score_spread":0.15610090479625877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6888852600","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000085466245,0.0012115747,0.00088890427,0.00019595727,0.0052295947,0.00042693788,0.00015814681,0.0014629511,0.99041736],"genre_scores_gemma":[0.00016448123,0.0035014732,0.00036111954,0.00006152982,0.0005035941,0.0000027174533,0.0000141500905,0.0006041876,0.99478674],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984137,0.000067920046,0.00014696224,0.00045390456,0.0003604446,0.0005571074],"domain_scores_gemma":[0.9981687,0.000099367084,0.0001056925,0.0014731889,0.000012909751,0.0001401108],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000037498932,0.0005231042,0.00039723955,0.00026487256,0.00014735122,0.00012897536,0.0014337215,0.0003745844,0.0011972653],"category_scores_gemma":[0.0000074039167,0.0004537078,0.00018692603,0.00031266693,0.000099212855,0.0004219526,0.00074178126,0.0003971967,0.00034063606],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002087018,0.000014807126,0.000020161293,0.00011358257,0.0004015872,0.00006871034,0.000050590683,0.0066188355,8.487452e-7,0.0011887855,0.9913128,0.00018841],"study_design_scores_gemma":[0.0008292129,0.000020697647,0.000022398639,0.00011918058,0.000105174804,6.8576804e-7,0.00013923342,0.0013344475,0.00003943621,0.000042498854,0.99675786,0.00058916677],"about_ca_topic_score_codex":0.00043767173,"about_ca_topic_score_gemma":0.22591227,"teacher_disagreement_score":0.2254746,"about_ca_system_score_codex":0.00010257984,"about_ca_system_score_gemma":0.00005005195,"threshold_uncertainty_score":0.99979144},"labels":[],"label_agreement":null},{"id":"W6889878898","doi":"10.3389/fmicb.2022.970358.s008","title":"Table_10_Evaluating the effects of antimicrobial drug use on the ecology of antimicrobial resistance and microbial community structure in beef feedlot cattle.csv","year":2022,"lang":"en","type":"dataset","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Resistome; UniFrac; Metagenomics; Microbiome; Context (archaeology); Antibiotic resistance; Antimicrobial; Microbial ecology; Salmonella enterica","score_opus":0.0161479222212711,"score_gpt":0.2180309096942055,"score_spread":0.2018829874729344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6889878898","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.102184996,0.0001296835,6.17109e-8,0.00005758083,0.00062729046,0.000804015,0.89614373,0.000031703243,0.000020936974],"genre_scores_gemma":[0.028415885,0.000049388684,0.000018775267,0.00026292822,0.00011304658,0.00011546709,0.97091573,0.00006448936,0.000044258504],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99752146,0.0009226175,0.0005687423,0.00031052064,0.0002694314,0.0004071985],"domain_scores_gemma":[0.9957222,0.002596242,0.00036215223,0.0012161154,0.00006868528,0.0000346335],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00038881245,0.00045275647,0.00062875974,0.00022917899,0.00029696315,0.000066691835,0.0012260807,0.00024096655,0.020472927],"category_scores_gemma":[0.0016509967,0.0003598624,0.00010789068,0.00042194963,0.00007808525,0.000084029,0.0010330483,0.0017971843,0.000009519487],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037027836,0.000054109925,0.000014522708,0.0042156605,0.00012689648,0.000009006225,0.00027079193,0.029731141,0.002121717,0.0000023332861,0.9634011,0.000015693686],"study_design_scores_gemma":[0.0017537148,0.00011277085,0.012621806,0.0075020166,0.00025502496,0.00001773646,0.0001458257,0.00015960973,0.021282217,0.0000082797,0.9551423,0.0009986522],"about_ca_topic_score_codex":0.0008599218,"about_ca_topic_score_gemma":0.011541515,"teacher_disagreement_score":0.07477203,"about_ca_system_score_codex":0.00018638962,"about_ca_system_score_gemma":0.000074304466,"threshold_uncertainty_score":0.9998853},"labels":[],"label_agreement":null},{"id":"W6890037794","doi":"10.3389/fsufs.2025.1443215.s001","title":"Data Sheet 1_Exploring the influence of natural features on soil mesofaunal communities in agricultural landscapes through DNA metabarcoding.xlsx","year":2025,"lang":"en","type":"dataset","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soil mesofauna; Biodiversity; Species richness; Habitat; Soil biology; Ecosystem; Vegetation (pathology); Ecosystem services","score_opus":0.03819569323705352,"score_gpt":0.25241609652442754,"score_spread":0.21422040328737402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6890037794","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00086158834,0.002273948,6.3398915e-8,0.000086429965,0.00034472218,0.00022865864,0.99543583,0.00011544651,0.0006533318],"genre_scores_gemma":[0.010842866,0.00031382925,0.000015385076,0.00015855701,0.00022396918,0.00021865229,0.98814106,0.000019877762,0.000065821],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984177,0.00010100268,0.00036323408,0.00029934288,0.0004328607,0.00038588612],"domain_scores_gemma":[0.9975466,0.0005322121,0.000118169264,0.0017140117,0.000060097133,0.000028879933],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000110576744,0.00047813548,0.00049244234,0.00018219733,0.000109178145,0.00012573977,0.0028990242,0.00018479525,0.0018752192],"category_scores_gemma":[0.00032702548,0.00032703535,0.00009693572,0.00041806645,0.000017401184,0.00044264848,0.0016688391,0.0011443609,0.000036660967],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005197193,0.000011703201,8.3984906e-7,0.0007426053,0.00014978976,0.000009042694,0.00011237923,0.21859,0.0000034983411,0.000010951677,0.780324,0.0000399995],"study_design_scores_gemma":[0.00019627243,0.000012605005,0.0018783556,0.0044474513,0.00006337894,0.0000029738874,0.00046251147,0.00062422693,0.00013236512,0.000003737466,0.991795,0.00038110834],"about_ca_topic_score_codex":0.000351687,"about_ca_topic_score_gemma":0.004399837,"teacher_disagreement_score":0.21796578,"about_ca_system_score_codex":0.000087895554,"about_ca_system_score_gemma":0.000027610167,"threshold_uncertainty_score":0.99991816},"labels":[],"label_agreement":null},{"id":"W6891659105","doi":"10.48336/5nqt-7182","title":"Design and implementation of peer-to-peer energy trading system using internet of things and blockchain","year":2024,"lang":"en","type":"article","venue":"Memorial University Research Repository (Memorial University)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Microgrid; Blockchain; Renewable energy; Energy (signal processing); The Internet; Distributed generation; Smart contract; Order (exchange)","score_opus":0.025511423586887634,"score_gpt":0.24750511626540034,"score_spread":0.2219936926785127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6891659105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.923064,0.000078531375,0.066506416,0.000054629643,0.004161379,0.00042270502,0.000011574018,0.00021709863,0.005483694],"genre_scores_gemma":[0.99478924,0.000020912017,0.0019815366,0.0000010762036,0.0005792728,2.768222e-7,0.000004458596,0.00002816291,0.0025950489],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979001,0.00036614444,0.00022625874,0.0003985859,0.000765228,0.0003436351],"domain_scores_gemma":[0.99893934,0.0002508739,0.000050236264,0.00021672611,0.0003452629,0.00019758691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010349477,0.00018758142,0.0003067369,0.0014374576,0.000195218,0.000086415166,0.0003492584,0.00012818837,0.000010640107],"category_scores_gemma":[0.000025265002,0.00023545405,0.000068784524,0.0010377099,0.00016336402,0.0003845311,0.00038013712,0.00022677018,7.824075e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034810505,0.00014678882,0.0008233695,0.0047177984,0.003072326,0.0052020294,0.0345085,0.13690107,0.61914504,0.1640238,0.018619237,0.009358971],"study_design_scores_gemma":[0.003392808,0.00082494813,0.00014846376,0.0007922905,0.0005154403,0.00007998964,0.033908114,0.6726707,0.22732224,0.00008717344,0.059472874,0.000784919],"about_ca_topic_score_codex":0.0033862803,"about_ca_topic_score_gemma":0.000039209914,"teacher_disagreement_score":0.5357697,"about_ca_system_score_codex":0.0008168133,"about_ca_system_score_gemma":0.00013084826,"threshold_uncertainty_score":0.96015376},"labels":[],"label_agreement":null},{"id":"W6893232032","doi":"10.5281/zenodo.14980890","title":"Fig. 15 in A revision of the genus Sclerocoelus Marshall (Diptera: Sphaeroceridae)","year":2025,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Paratype; Holotype; Genus; Dorsum; Scale (ratio)","score_opus":0.015872139443455956,"score_gpt":0.2076915588379293,"score_spread":0.19181941939447336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6893232032","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00029587504,0.0008140092,0.001723444,0.00012497226,0.00041432932,0.00060666626,0.00015512359,0.00090217363,0.9949634],"genre_scores_gemma":[0.26295012,0.0069922823,0.0013819466,0.0004923145,0.0012692636,4.858388e-7,0.0023774535,0.03117496,0.69336116],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986079,0.00014986895,0.00030128786,0.00031743335,0.0003320042,0.00029152608],"domain_scores_gemma":[0.99904495,0.000008268231,0.0000923159,0.00070232345,0.00009437332,0.0000577495],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0002736388,0.00021693736,0.00024474258,0.00044163305,0.0001881872,0.00013693733,0.001223615,0.00013013999,0.019874504],"category_scores_gemma":[0.00015630123,0.00020483676,0.00007297238,0.0007101022,0.000069407004,0.000052451727,0.0013071684,0.00031316982,0.00175833],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008528691,0.000032150307,0.0000025589443,0.0005005177,0.00006481202,0.0000072362063,0.000110713496,0.0030498814,0.00008941715,0.0005969495,0.9037147,0.091822535],"study_design_scores_gemma":[0.00031092524,0.00002215947,0.00042573328,0.0006187137,0.00001745014,0.0000043432583,0.000024723022,0.0010101891,0.000071184986,0.000011711616,0.99731326,0.00016962459],"about_ca_topic_score_codex":0.000064798856,"about_ca_topic_score_gemma":0.000005397776,"teacher_disagreement_score":0.3016022,"about_ca_system_score_codex":0.00019587384,"about_ca_system_score_gemma":0.0000035737708,"threshold_uncertainty_score":0.9990189},"labels":[],"label_agreement":null},{"id":"W6894396698","doi":"10.5683/sp3/jvm89b","title":"Supplementary Data for \"Myocytic androgen receptor overexpression does not affect sex differences in adaptation to chronic endurance exercise\"","year":2022,"lang":"en","type":"dataset","venue":"Borealis","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Affect (linguistics); Androgen receptor; Adaptation (eye); Androgen; Receptor","score_opus":0.028325659402657435,"score_gpt":0.2567290174238784,"score_spread":0.22840335802122094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6894396698","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005028438,0.00022657005,0.0002559067,0.00009336639,0.0008069293,0.0013859617,0.99662983,0.00008788071,0.0000106926345],"genre_scores_gemma":[0.0007828728,0.0015252607,0.00040719012,0.0000808087,0.00041028752,0.0017375835,0.9949463,0.00006585227,0.000043850363],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99786663,0.00006708341,0.00042729877,0.00069830014,0.00048260012,0.00045810413],"domain_scores_gemma":[0.9981318,0.00015533237,0.000088716595,0.0015132935,0.000012992908,0.00009788275],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003228061,0.000415425,0.0004934928,0.00030292838,0.00009068468,0.00007315926,0.0013378466,0.00012609844,0.0034810842],"category_scores_gemma":[0.000043101238,0.00037308468,0.000063133935,0.00018957087,0.000016378317,0.00017331996,0.0007219997,0.00023003314,0.000003324391],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006341368,0.000029979845,0.000018972189,0.00071316457,0.00007523085,0.0000069789085,0.000067288696,0.020533524,0.00011448027,0.0000029635144,0.97655165,0.0018223728],"study_design_scores_gemma":[0.00062631257,0.0000791374,0.00024780238,0.0003521783,0.000090167545,5.1740307e-7,0.0001152455,0.010758842,0.0007314652,0.000007622597,0.98651236,0.0004783277],"about_ca_topic_score_codex":0.019400643,"about_ca_topic_score_gemma":0.03731485,"teacher_disagreement_score":0.017914206,"about_ca_system_score_codex":0.00068154314,"about_ca_system_score_gemma":0.000058467576,"threshold_uncertainty_score":0.9998721},"labels":[],"label_agreement":null},{"id":"W6901604272","doi":"10.60692/1r03f-f2157","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Load management; Scheduling (production processes); Energy management; Efficient energy use; Demand side; Grid; Load balancing (electrical power)","score_opus":0.01454191592027209,"score_gpt":0.1767379192982555,"score_spread":0.1621960033779834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901604272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7648627,0.000034264027,0.21621007,0.000005594679,0.0011503217,0.0002065462,0.000040409683,0.0002819784,0.01720813],"genre_scores_gemma":[0.9976589,9.764852e-7,0.002136299,0.000013595861,0.0000284118,0.000096385855,0.000010010382,0.000016622773,0.00003878414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983472,0.000032651344,0.0007763516,0.000109016604,0.000506129,0.00022860445],"domain_scores_gemma":[0.9993375,0.000006959993,0.0002075102,0.00033389824,0.000068869565,0.00004526263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003993329,0.00016505481,0.00025536751,0.00029068996,0.00009350034,0.000027038966,0.00020971822,0.00003092259,0.0000311984],"category_scores_gemma":[0.000002915807,0.00017631837,0.00007811421,0.00031727267,0.000021426666,0.00024618374,0.00023738519,0.000068561254,0.000016737722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018877867,0.0000021445212,0.0019783967,0.0010293076,0.00013829442,0.0000056533413,0.004685214,0.990607,0.000009923289,0.0013543555,0.000049429873,0.00012139505],"study_design_scores_gemma":[0.0018597809,0.000109923254,0.003991254,0.000376762,0.00012790984,0.000046830723,0.043586824,0.93310976,0.0130853625,0.0000014274358,0.0031973962,0.0005067892],"about_ca_topic_score_codex":0.000015241727,"about_ca_topic_score_gemma":2.0321774e-7,"teacher_disagreement_score":0.23279622,"about_ca_system_score_codex":0.0003137149,"about_ca_system_score_gemma":0.000014581217,"threshold_uncertainty_score":0.71900547},"labels":[],"label_agreement":null},{"id":"W6901674607","doi":"10.60692/vvaga-pvj81","title":"Reviewing the scope and thematic focus of 100 000 publications on energy consumption, services and social aspects of climate change: a big data approach to demand-side mitigation *","year":2021,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Typology; Climate change; Underpinning; Centrality; Scope (computer science); Big data; Action (physics); Thematic analysis; Politics","score_opus":0.08806154543724386,"score_gpt":0.2303908312390615,"score_spread":0.14232928580181764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901674607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81896853,0.0012021451,0.11755563,0.00081395236,0.00077144505,0.0021765088,0.000799641,0.0005524899,0.057159677],"genre_scores_gemma":[0.9992751,0.000044041848,0.00028780525,0.000078000725,0.00006824709,0.00012683666,0.00010620259,0.000009643121,0.0000041093003],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990315,0.00005824395,0.00048051958,0.00011868837,0.00019044867,0.00012062664],"domain_scores_gemma":[0.99923855,0.000015870222,0.00018207174,0.0004254952,0.00010594172,0.00003204468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003857299,0.00011570607,0.00021350934,0.0001649579,0.00009737031,0.00010143397,0.00015726098,0.000041545834,0.0000022107668],"category_scores_gemma":[0.000010077715,0.00008961184,0.000019221307,0.00025656013,0.000020753021,0.00045812136,0.00016142108,0.000034672565,0.0000069643056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009154497,0.000061204984,0.036787346,0.12374611,0.001680543,0.000003395077,0.44983903,0.027896287,0.00021075997,0.25952226,0.0008134359,0.09934808],"study_design_scores_gemma":[0.004601399,0.00014264783,0.3900581,0.01234747,0.0012356897,0.00022048646,0.071264,0.49382332,0.017026013,0.00010042614,0.0073066433,0.0018737934],"about_ca_topic_score_codex":0.000010277285,"about_ca_topic_score_gemma":0.0000032221442,"teacher_disagreement_score":0.46592703,"about_ca_system_score_codex":0.000027235534,"about_ca_system_score_gemma":0.0000068728477,"threshold_uncertainty_score":0.36542648},"labels":[],"label_agreement":null},{"id":"W6901705303","doi":"10.60692/x23z3-fr886","title":"Optimal Scheduling of Demand Side Load Management of Smart Grid Considering Energy Efficiency","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Smart grid; Demand response; Load management; Scheduling (production processes); Energy management; Efficient energy use; Demand side; Grid; Load balancing (electrical power)","score_opus":0.01454191592027209,"score_gpt":0.1767379192982555,"score_spread":0.1621960033779834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901705303","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7648627,0.000034264027,0.21621007,0.000005594679,0.0011503217,0.0002065462,0.000040409683,0.0002819784,0.01720813],"genre_scores_gemma":[0.9976589,9.764852e-7,0.002136299,0.000013595861,0.0000284118,0.000096385855,0.000010010382,0.000016622773,0.00003878414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983472,0.000032651344,0.0007763516,0.000109016604,0.000506129,0.00022860445],"domain_scores_gemma":[0.9993375,0.000006959993,0.0002075102,0.00033389824,0.000068869565,0.00004526263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003993329,0.00016505481,0.00025536751,0.00029068996,0.00009350034,0.000027038966,0.00020971822,0.00003092259,0.0000311984],"category_scores_gemma":[0.000002915807,0.00017631837,0.00007811421,0.00031727267,0.000021426666,0.00024618374,0.00023738519,0.000068561254,0.000016737722],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018877867,0.0000021445212,0.0019783967,0.0010293076,0.00013829442,0.0000056533413,0.004685214,0.990607,0.000009923289,0.0013543555,0.000049429873,0.00012139505],"study_design_scores_gemma":[0.0018597809,0.000109923254,0.003991254,0.000376762,0.00012790984,0.000046830723,0.043586824,0.93310976,0.0130853625,0.0000014274358,0.0031973962,0.0005067892],"about_ca_topic_score_codex":0.000015241727,"about_ca_topic_score_gemma":2.0321774e-7,"teacher_disagreement_score":0.23279622,"about_ca_system_score_codex":0.0003137149,"about_ca_system_score_gemma":0.000014581217,"threshold_uncertainty_score":0.71900547},"labels":[],"label_agreement":null},{"id":"W6920869463","doi":"10.6084/m9.figshare.17012.v1","title":"Women and HIV-5","year":2011,"lang":"en","type":"other","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Health care; Public health; Human immunodeficiency virus (HIV); Population; MEDLINE","score_opus":0.01900911034866176,"score_gpt":0.17234332204126132,"score_spread":0.15333421169259956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6920869463","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[8.3979404e-7,0.00087322766,0.0000017353852,0.0000010940335,0.00012556367,0.00007271485,0.05797689,0.00074261025,0.94020534],"genre_scores_gemma":[0.000071280505,0.00004415277,0.00008866128,0.000040450035,0.00046788037,0.00035053567,0.03464143,0.0006512602,0.9636443],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961305,0.0000027997237,0.00004939703,0.000116783725,0.000053607408,0.00016436084],"domain_scores_gemma":[0.9997278,0.000004621749,0.000014508507,0.00019692542,0.0000028767654,0.00005327982],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000005897836,0.00014473965,0.00011414164,0.00009321216,0.0000059142726,0.000014014676,0.000105891624,0.00011107439,0.7727497],"category_scores_gemma":[0.00001159949,0.0001516658,0.0000142129265,0.000036190282,0.000001641887,0.000014714219,0.00007117961,0.00007117273,0.01162365],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.4229543e-7,0.0000012565238,0.0000010887549,0.0003148877,0.000040483912,0.0000071850573,0.00004080258,0.000050626815,1.6532907e-7,0.00000759596,0.99878454,0.000751194],"study_design_scores_gemma":[0.00005280608,0.000003176349,0.000070859234,0.0005070473,0.0000022553795,7.2605195e-7,0.0000043665837,0.00012221329,0.000004429018,0.000007193092,0.9990552,0.00016973869],"about_ca_topic_score_codex":0.0000019883253,"about_ca_topic_score_gemma":0.0000069491507,"teacher_disagreement_score":0.76112604,"about_ca_system_score_codex":0.000029119903,"about_ca_system_score_gemma":0.0000025740553,"threshold_uncertainty_score":0.98914593},"labels":[],"label_agreement":null},{"id":"W6943611036","doi":"10.1582/leuros.2010.06.03002","title":"Demand-responsive lighting: a field study","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Resources Canada; National Research Council Canada; Public Works and Government Services Canada; Electric Power Research Institute","keywords":"Electricity; Electric field; Electric shock; Field (mathematics); Stress (linguistics)","score_opus":0.005406230793626936,"score_gpt":0.20881990591301233,"score_spread":0.2034136751193854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6943611036","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8839706,0.000005787687,0.0011897134,0.00021064529,0.0011617759,0.00013726311,3.727963e-7,0.00032311052,0.1130007],"genre_scores_gemma":[0.9979714,0.000002260826,0.00096148276,0.00010819002,0.00025463634,0.00004170066,6.263215e-7,0.000021020383,0.0006386937],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994611,0.000013081736,0.00010905267,0.00012113115,0.0001222563,0.00017335848],"domain_scores_gemma":[0.9995528,0.00008008599,0.000009885313,0.00028827818,0.000016643795,0.00005230283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013174338,0.000095672185,0.00009127252,0.00006956521,0.000038363338,0.000026168047,0.0001522434,0.000041585743,0.00060910574],"category_scores_gemma":[0.00006502566,0.000092043185,0.000027798143,0.00010111285,0.000008103861,0.000049085527,0.000055796412,0.00018974222,0.00014388749],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009873146,0.00056542264,0.037689995,0.00009862298,0.00064783107,0.00040349545,0.0065295566,0.042417713,0.54962873,0.016493814,0.31330928,0.032116782],"study_design_scores_gemma":[0.0034455762,0.00091351126,0.09109938,0.000047112626,0.00016540651,0.000031369702,0.0020544324,0.09287707,0.22996044,0.0064070877,0.57119656,0.0018020544],"about_ca_topic_score_codex":0.0000048700085,"about_ca_topic_score_gemma":0.00007421159,"teacher_disagreement_score":0.3196683,"about_ca_system_score_codex":0.000010267074,"about_ca_system_score_gemma":0.0000042922125,"threshold_uncertainty_score":0.66692805},"labels":[],"label_agreement":null},{"id":"W6943627593","doi":"10.17605/osf.io/sjvz4","title":"Energy demand and carbon emissions reduction potential of dynamic pricing of electricity: a systematic review and meta-analysis of experimental evidence","year":2022,"lang":"en","type":"other","venue":"OSF Preprints (OSF Preprints)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Incentive; Energy demand; Energy consumption; Dynamic pricing; Consumption (sociology); Efficient energy use; Energy (signal processing); Peak demand; Energy conservation","score_opus":0.013435202630141408,"score_gpt":0.24509871389122487,"score_spread":0.23166351126108345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6943627593","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031822808,0.1375469,0.01616047,0.00015814873,0.00077217806,0.010431575,0.00019810743,0.0008224431,0.80208737],"genre_scores_gemma":[0.73006976,0.039594833,0.0008260007,0.000019842988,0.000018791425,0.0009574305,0.00003975093,0.00033023042,0.22814335],"study_design_codex":"systematic_review","study_design_gemma":"meta_analysis","domain_scores_codex":[0.99692863,0.00050474284,0.0009906592,0.0009327989,0.00045369947,0.00018946434],"domain_scores_gemma":[0.9970946,0.00013625891,0.0007510134,0.0018904473,0.00004849911,0.00007923171],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0016677065,0.00035192585,0.002376002,0.0007778631,0.000030929503,0.000011575761,0.00041377795,0.00013922866,0.05584594],"category_scores_gemma":[0.00029366213,0.0003514625,0.00045838475,0.0006759794,0.0000847952,0.00005922847,0.0007424297,0.00017708386,0.00006941767],"study_design_candidate":"meta_analysis","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006627559,0.00061071024,0.00023538883,0.4075644,0.38728157,0.00002412571,0.0012459039,0.12059054,0.07243072,0.00054502423,0.009062986,0.00034235077],"study_design_scores_gemma":[0.00046318138,0.0000121059375,0.00028245623,0.010255717,0.87996894,0.00005397663,0.00038426626,0.08238371,0.0239731,0.000079636935,0.00090831745,0.0012345978],"about_ca_topic_score_codex":0.0006818528,"about_ca_topic_score_gemma":0.000035458863,"teacher_disagreement_score":0.69824696,"about_ca_system_score_codex":0.00016634673,"about_ca_system_score_gemma":0.000026641059,"threshold_uncertainty_score":0.9998937},"labels":[],"label_agreement":null},{"id":"W6957879477","doi":"10.60692/tfadh-xjp28","title":"Reviewing the scope and thematic focus of 100 000 publications on energy consumption, services and social aspects of climate change: a big data approach to demand-side mitigation *","year":2021,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Typology; Climate change; Underpinning; Centrality; Scope (computer science); Big data; Action (physics); Thematic analysis; Politics","score_opus":0.08806154543724386,"score_gpt":0.2303908312390615,"score_spread":0.14232928580181764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6957879477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81896853,0.0012021451,0.11755563,0.00081395236,0.00077144505,0.0021765088,0.000799641,0.0005524899,0.057159677],"genre_scores_gemma":[0.9992751,0.000044041848,0.00028780525,0.000078000725,0.00006824709,0.00012683666,0.00010620259,0.000009643121,0.0000041093003],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990315,0.00005824395,0.00048051958,0.00011868837,0.00019044867,0.00012062664],"domain_scores_gemma":[0.99923855,0.000015870222,0.00018207174,0.0004254952,0.00010594172,0.00003204468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003857299,0.00011570607,0.00021350934,0.0001649579,0.00009737031,0.00010143397,0.00015726098,0.000041545834,0.0000022107668],"category_scores_gemma":[0.000010077715,0.00008961184,0.000019221307,0.00025656013,0.000020753021,0.00045812136,0.00016142108,0.000034672565,0.0000069643056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009154497,0.000061204984,0.036787346,0.12374611,0.001680543,0.000003395077,0.44983903,0.027896287,0.00021075997,0.25952226,0.0008134359,0.09934808],"study_design_scores_gemma":[0.004601399,0.00014264783,0.3900581,0.01234747,0.0012356897,0.00022048646,0.071264,0.49382332,0.017026013,0.00010042614,0.0073066433,0.0018737934],"about_ca_topic_score_codex":0.000010277285,"about_ca_topic_score_gemma":0.0000032221442,"teacher_disagreement_score":0.46592703,"about_ca_system_score_codex":0.000027235534,"about_ca_system_score_gemma":0.0000068728477,"threshold_uncertainty_score":0.36542648},"labels":[],"label_agreement":null},{"id":"W6958117054","doi":"10.60692/ccs9d-syx60","title":"Prediction of Electric Power Demand of HVACs for Operating Rooms in Case of Dynamic Set Points of Temperature: A Case Study","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Artificial neural network; Electric power; Set (abstract data type); Power consumption; Power (physics); Demand response; Electric power system; Recurrent neural network","score_opus":0.015236611579363133,"score_gpt":0.20181450466841117,"score_spread":0.18657789308904804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958117054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99492943,0.000008200365,0.0035276618,0.0000011847765,0.00022149572,0.0008830913,0.00032858286,0.00004035684,0.000059977312],"genre_scores_gemma":[0.99962425,8.627117e-8,0.00014569818,0.000002159044,0.0000058587975,0.00018134368,0.000023175278,0.000012706189,0.000004735756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998515,0.000067599125,0.0010105295,0.0000808993,0.00020199137,0.0001239919],"domain_scores_gemma":[0.9993338,0.000013814462,0.00027977335,0.0002415419,0.00011063001,0.000020467116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063677167,0.0001187818,0.00029944108,0.00054220826,0.00004391118,0.000009632776,0.000082879335,0.00003982244,0.0000055133687],"category_scores_gemma":[0.000015077388,0.00011705117,0.000051260988,0.00045669771,0.0000065963236,0.0002415461,0.000055009063,0.00007492602,4.0132798e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058123132,0.000021221298,0.046462934,0.002167657,0.00018416457,0.00010204087,0.102190346,0.84844935,0.00025258196,0.00001819534,0.00002869187,0.00006468283],"study_design_scores_gemma":[0.0029732368,0.0005948001,0.011813649,0.00013507497,0.00008606887,0.0014095189,0.16089708,0.8179833,0.0039466196,2.8019488e-7,0.0000044570534,0.00015587344],"about_ca_topic_score_codex":0.000070067304,"about_ca_topic_score_gemma":0.0000058532705,"teacher_disagreement_score":0.058706727,"about_ca_system_score_codex":0.00014853929,"about_ca_system_score_gemma":0.000015552321,"threshold_uncertainty_score":0.4773208},"labels":[],"label_agreement":null},{"id":"W6958135421","doi":"10.60692/2a9gm-2nb72","title":"Novel Predictive Home Appliance's Management Algorithm in Smart Grids","year":2020,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Smart grid; Scheduling (production processes); Energy consumption; Grid; Electricity; Electric power system; Key (lock); Energy management","score_opus":0.01692664865274803,"score_gpt":0.16634359805735677,"score_spread":0.14941694940460873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958135421","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020668996,0.0000040604277,0.9498281,0.000056228353,0.000960223,0.0006495009,0.00009985508,0.0010393491,0.026693694],"genre_scores_gemma":[0.99557424,6.966824e-7,0.003697282,0.00018427402,0.00015210656,0.00028828505,0.000033447486,0.00002341602,0.000046257665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871475,0.000011228689,0.0005270759,0.00015435721,0.0003034351,0.00028914478],"domain_scores_gemma":[0.9995502,0.0000023169305,0.00006611271,0.00024367384,0.0000312827,0.000106383806],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00013753383,0.00021497843,0.00022014556,0.00023452622,0.00003631549,0.00009565648,0.00021064686,0.000069615875,0.000014014642],"category_scores_gemma":[0.0000015764698,0.00021560422,0.000048348153,0.00044452888,0.000012553306,0.00057451846,0.00009907976,0.000110227666,0.00081655954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052650128,0.000005199867,0.025223533,0.0026381963,0.00034526494,0.000031426134,0.0479499,0.91464007,0.0000024774108,0.0009451089,0.0023132185,0.005852962],"study_design_scores_gemma":[0.0017741611,0.000033482473,0.07711985,0.00015468233,0.000028792483,0.000007061391,0.0077938065,0.90571696,0.00013050086,7.309163e-7,0.006867034,0.00037296343],"about_ca_topic_score_codex":0.0000035813769,"about_ca_topic_score_gemma":1.0473617e-7,"teacher_disagreement_score":0.97490525,"about_ca_system_score_codex":0.00023834291,"about_ca_system_score_gemma":0.0000044159005,"threshold_uncertainty_score":0.99996144},"labels":[],"label_agreement":null},{"id":"W6958158207","doi":"10.6084/m9.figshare.26720043","title":"Additional file 2 of Developing a survey to measure nursing students’ knowledge, attitudes and beliefs, influences, and willingness to be involved in Medical Assistance in Dying (MAiD): a mixed method modified e-Delphi study","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Selkirk College","funders":"","keywords":"Measure (data warehouse); Data collection; MEDLINE; Interview","score_opus":0.06793382780371895,"score_gpt":0.3347030280802281,"score_spread":0.2667692002765092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958158207","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13454011,0.0020957224,0.00082847505,0.00013696315,0.0003132248,0.001534984,0.85980695,0.00035981432,0.00038376538],"genre_scores_gemma":[0.9229839,0.0000075455637,0.0067723617,0.000098369565,0.00009309824,0.0025350743,0.06739621,0.00007859896,0.000034873636],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9981754,0.00017416876,0.00041623425,0.0004254083,0.00053081615,0.00027796946],"domain_scores_gemma":[0.99798906,0.0016034505,0.000026822489,0.00014986319,0.000089987196,0.00014081961],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00054527214,0.0002191293,0.00033242814,0.00037993133,0.00004225941,0.00011799092,0.0002724596,0.00009572474,0.03812632],"category_scores_gemma":[0.002484775,0.00023715496,0.000018787241,0.0010873419,0.000009886647,0.00015965581,0.00024280003,0.00022321101,0.00001741425],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049044633,0.00031299677,0.00808208,0.0021796871,0.00025711302,0.0001611064,0.008315357,0.049859215,0.000021447011,0.000028743283,0.91329694,0.017436253],"study_design_scores_gemma":[0.0003869442,0.000038766455,0.947301,0.02687766,0.0000062614226,0.0000021488554,0.00041615247,0.015435758,0.000016806745,0.000012767533,0.009154829,0.00035095096],"about_ca_topic_score_codex":0.00005047777,"about_ca_topic_score_gemma":0.009696077,"teacher_disagreement_score":0.9392189,"about_ca_system_score_codex":0.00024171502,"about_ca_system_score_gemma":0.0001196689,"threshold_uncertainty_score":0.96708983},"labels":[],"label_agreement":null},{"id":"W6963759802","doi":"10.22004/ag.econ.236780","title":"Leadership in Sustainable Agribusiness, Innovation, and Solar Thermal Renewable Energy: Opportunities for Sustainable Agribusiness","year":2016,"lang":"en","type":"article","venue":"AgEcon Search (University of Minnesota, USA)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Gloom; Production (economics); Government (linguistics); Licensee","score_opus":0.06714554036268452,"score_gpt":0.20167587459819256,"score_spread":0.13453033423550803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6963759802","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9417918,0.00030990722,0.04237874,0.0050711595,0.00012616933,0.0005250667,0.000026066155,0.00016148729,0.009609662],"genre_scores_gemma":[0.9245113,0.00035155535,0.0003875096,0.00006988631,0.00006535407,0.000007680735,0.000044196408,0.000039502178,0.07452297],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832493,0.00005772362,0.000220983,0.00031055388,0.00023231606,0.0008535123],"domain_scores_gemma":[0.99868983,0.00015930933,0.000067365945,0.00030982975,0.0006864666,0.00008721917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007676324,0.00021935781,0.0003138781,0.0008302822,0.00021424306,0.000047905378,0.0003352602,0.00013674654,0.00019290212],"category_scores_gemma":[0.000073419884,0.00023126276,0.00004552297,0.00092641584,0.00023469176,0.0014514261,0.0002383839,0.00009062687,0.0000036603992],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011621367,0.0005965407,0.023597788,0.0121361585,0.0009636241,0.003139812,0.0049785,0.16453728,0.025137464,0.47505978,0.23454623,0.05414469],"study_design_scores_gemma":[0.009319296,0.00038136536,0.07674547,0.0005400776,0.00013243068,0.000019175128,0.17673871,0.015205199,0.013266599,0.0032425192,0.7025075,0.0019016548],"about_ca_topic_score_codex":0.0038608322,"about_ca_topic_score_gemma":0.001284504,"teacher_disagreement_score":0.47181726,"about_ca_system_score_codex":0.00025557232,"about_ca_system_score_gemma":0.00013789338,"threshold_uncertainty_score":0.9430621},"labels":[],"label_agreement":null},{"id":"W6976730344","doi":"10.60692/x0rgj-4aa51","title":"Framework for optimizing the demand contracted by large customers","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Tariff; Demand forecasting; Work (physics); Plan (archaeology); Demand management; Peak demand; Demand patterns; Supply and demand","score_opus":0.014514065384339475,"score_gpt":0.19124520906246664,"score_spread":0.17673114367812717,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6976730344","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053943437,0.000019632815,0.93844646,0.00008738103,0.00180819,0.0007495971,0.00034659635,0.00071427075,0.003884446],"genre_scores_gemma":[0.9980845,1.9360053e-7,0.00073442305,0.0002478991,0.00007097682,0.0006966006,0.00006490427,0.000019637973,0.00008087035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990677,0.000032150398,0.00033757804,0.00007341474,0.00022178092,0.000267335],"domain_scores_gemma":[0.9995621,0.00002163707,0.00009110864,0.00025313994,0.000032825184,0.000039175797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041813866,0.00012765947,0.00013260155,0.000101252226,0.0003460361,0.00011385448,0.00020346814,0.00004336573,0.00003529482],"category_scores_gemma":[0.000010010155,0.000103244776,0.000059075654,0.00018496325,0.000007308834,0.000267607,0.000067650915,0.00013547576,0.000062462765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030284466,0.0000015824066,0.001627131,0.0002833582,0.00017529864,8.4014505e-7,0.0301098,0.947349,0.000001926146,0.0051166387,0.015162822,0.00014132174],"study_design_scores_gemma":[0.001549358,0.000033260923,0.0013336458,0.000051134426,0.00007029604,0.000013503247,0.044113748,0.73737115,0.0002782758,0.000004442696,0.21478403,0.00039718632],"about_ca_topic_score_codex":0.0000011571065,"about_ca_topic_score_gemma":3.6944893e-8,"teacher_disagreement_score":0.94414103,"about_ca_system_score_codex":0.00017880839,"about_ca_system_score_gemma":0.0000051457596,"threshold_uncertainty_score":0.42101997},"labels":[],"label_agreement":null},{"id":"W6984273041","doi":"","title":"Aero 13oct 2015","year":2015,"lang":"fr","type":"other","venue":"Bulletin of Miscellaneous Information (Royal Gardens Kew)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photography; Reflection (computer programming); Work (physics)","score_opus":0.005956999137625287,"score_gpt":0.17442966546081734,"score_spread":0.16847266632319205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6984273041","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006544401,0.0017362871,0.0000060781204,0.0005216526,0.0028217183,0.00051113765,0.00014600201,0.00036251207,0.9938292],"genre_scores_gemma":[0.0003784337,0.0005055148,0.00339459,0.00020781618,0.00077249866,0.000031088235,0.0003326188,0.00022839957,0.994149],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971048,0.00009671238,0.0011067688,0.00029286917,0.00075213314,0.0006467226],"domain_scores_gemma":[0.9980694,0.000108344866,0.00043429094,0.0007456298,0.00030918588,0.00033316587],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00044460132,0.00070717937,0.00072299154,0.00014522464,0.000063702995,0.000094989526,0.0006100142,0.0006457694,0.75669926],"category_scores_gemma":[0.00016593063,0.0007900956,0.00022795198,0.000017806038,0.00016514344,3.7140794e-7,0.00023201191,0.00046675664,0.15662494],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030231857,0.00004185845,0.0000026162497,0.0007322915,0.00024007,0.0000390375,0.00031335733,0.18370746,3.362167e-7,0.00021053609,0.8117124,0.002969795],"study_design_scores_gemma":[0.000803833,0.00015097346,0.000030459267,0.00038515756,0.00016804284,0.00006530599,0.00013428622,0.00088824873,0.00001119963,0.000022127473,0.996597,0.000743368],"about_ca_topic_score_codex":0.0046436274,"about_ca_topic_score_gemma":0.0027761357,"teacher_disagreement_score":0.60007435,"about_ca_system_score_codex":0.000403541,"about_ca_system_score_gemma":0.000057763595,"threshold_uncertainty_score":0.999455},"labels":[],"label_agreement":null},{"id":"W6989592608","doi":"","title":"Black &amp;amp; Veatch ‘Smart Grid’ Project in Canada Wins","year":2024,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Subject (documents); Focus (optics); Field (mathematics); Work (physics)","score_opus":0.015258548786419558,"score_gpt":0.21671727912892416,"score_spread":0.2014587303425046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989592608","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017246169,0.0005632742,0.00028884207,0.00011013127,0.0046482836,0.0003782106,0.000052171934,0.00084306806,0.9929436],"genre_scores_gemma":[0.00050379895,0.00028381622,0.0007982119,0.00014696691,0.0008481679,0.00008967856,0.00013444127,0.0009985373,0.9961964],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986246,0.000015672722,0.0002538887,0.00037557905,0.0002974686,0.00043275816],"domain_scores_gemma":[0.9993108,0.00001318564,0.000020691044,0.00058729347,0.000006179753,0.00006184473],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00007153188,0.00040147183,0.00034914035,0.00042628174,0.0000059231797,0.000042318934,0.00028107548,0.00021180877,0.0042818496],"category_scores_gemma":[0.00000683324,0.00038963673,0.000057622747,0.00042328943,0.000016369006,0.000024946205,0.00011359824,0.0004434356,0.0032353231],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.8829803e-7,0.000005075388,0.00017301658,0.0004557028,0.00015380718,0.000042423617,0.000041820273,0.014181285,0.0000022107015,0.0001343898,0.98469234,0.000117253716],"study_design_scores_gemma":[0.00010454266,0.000001935795,0.00010571642,0.00022085663,0.000028283772,0.0000015069436,0.000036847825,0.00097437896,0.0000050250355,0.000011495629,0.9980728,0.00043662224],"about_ca_topic_score_codex":0.9622947,"about_ca_topic_score_gemma":0.9992549,"teacher_disagreement_score":0.036960162,"about_ca_system_score_codex":0.0010334618,"about_ca_system_score_gemma":0.00028307538,"threshold_uncertainty_score":0.9998556},"labels":[],"label_agreement":null},{"id":"W6989735454","doi":"","title":"Canada announces \"first and biggest\" smart grid system in North America","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Work (physics); Grid","score_opus":0.003181518156043853,"score_gpt":0.14067058050881245,"score_spread":0.1374890623527686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989735454","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00038197564,0.0010638466,0.00010194018,0.000053520213,0.0028188154,0.00024477942,0.00008273878,0.00044023464,0.99481213],"genre_scores_gemma":[0.024450067,0.0012857054,0.00041765792,0.00023828461,0.0009936324,0.0001143153,0.00019715099,0.0008197138,0.97148347],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991045,0.0000093651015,0.00017339234,0.00024988534,0.00019712458,0.00026575953],"domain_scores_gemma":[0.99955,0.000020084482,0.000036668793,0.00032609602,0.0000057800926,0.00006138229],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000027354152,0.0002734918,0.00033751593,0.00021353355,0.000012416473,0.000025724656,0.00016779169,0.00007953748,0.00011536693],"category_scores_gemma":[0.0000023623652,0.00025532104,0.000018056908,0.00022307625,0.000016750268,0.000023451632,0.00005726941,0.0001118154,0.00007363736],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.0696794e-7,0.0000023770465,0.0035425273,0.00067109644,0.000069661895,0.000033339995,0.000010087389,0.03389336,1.0438289e-7,0.00006717025,0.96150786,0.00020184011],"study_design_scores_gemma":[0.000120533434,0.0000067496394,0.0026513177,0.00015155839,0.000011657738,0.0000017514226,0.000088110246,0.005167984,6.7074905e-7,3.439136e-8,0.99150276,0.00029685206],"about_ca_topic_score_codex":0.8726046,"about_ca_topic_score_gemma":0.9945747,"teacher_disagreement_score":0.121970065,"about_ca_system_score_codex":0.00029238607,"about_ca_system_score_gemma":0.000062626255,"threshold_uncertainty_score":0.9999899},"labels":[],"label_agreement":null},{"id":"W6991334718","doi":"","title":"Flat opening for Toronto | RenewableEnergyWorld.com","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Intersection (aeronautics); Set (abstract data type); Perspective (graphical)","score_opus":0.006982232369297434,"score_gpt":0.2006928977059572,"score_spread":0.19371066533665976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991334718","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.2699241e-7,0.0009921086,0.16102919,0.00001828313,0.0022147663,0.00022890535,0.000010001515,0.0015522517,0.8339543],"genre_scores_gemma":[0.00009662957,0.00022940792,0.011732102,0.00011629158,0.001644067,0.00019480809,0.0001870474,0.0011713548,0.9846283],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904335,0.00000869523,0.00019174539,0.0002781758,0.00013222785,0.0003458011],"domain_scores_gemma":[0.9993248,0.000028275203,0.00003746439,0.00052396266,0.000007543613,0.000077963996],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009165832,0.00033534408,0.00034595843,0.000089149464,0.000024575129,0.00004815416,0.00031813083,0.0001954806,0.008292101],"category_scores_gemma":[0.000004895849,0.00032808207,0.00007456245,0.000041002848,0.000009599824,0.000048081816,0.00007880751,0.000049166676,0.00015398822],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012353111,0.0000017867122,0.0000011471534,0.00013271104,0.00016240323,0.00000118609,0.0000032484563,0.053502575,0.000018973842,0.004159914,0.93987757,0.0021372668],"study_design_scores_gemma":[0.00024946887,0.000013088522,8.321127e-7,0.000076955745,0.00004072063,6.325693e-7,0.00000726503,0.033704966,0.00012958895,0.000026949167,0.96534204,0.00040746562],"about_ca_topic_score_codex":0.00256023,"about_ca_topic_score_gemma":0.021998033,"teacher_disagreement_score":0.15067403,"about_ca_system_score_codex":0.00015402237,"about_ca_system_score_gemma":0.0000056643935,"threshold_uncertainty_score":0.99991715},"labels":[],"label_agreement":null},{"id":"W6992280334","doi":"","title":"The Latest Electrical Technologies and Their Applications in North Vancouver Homes","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Key (lock); Emerging technologies; Government (linguistics)","score_opus":0.004096937486882225,"score_gpt":0.17226218853801242,"score_spread":0.1681652510511302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6992280334","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014169584,0.0062719756,0.004167258,0.00020071992,0.0006344618,0.000827867,0.000014884619,0.016935637,0.9708055],"genre_scores_gemma":[0.032114252,0.030623807,0.0005662452,0.000026180032,0.00027567244,0.0018578193,0.000024967865,0.0019731994,0.93253785],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955076,0.0000032359592,0.00008733164,0.00013626726,0.00004771453,0.0001746775],"domain_scores_gemma":[0.9996081,0.00009224774,0.000013069138,0.00027330703,0.000002865954,0.0000104031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002844291,0.00014776523,0.00012119808,0.00019015455,0.000025265734,0.00002029588,0.00018425065,0.0001080329,0.0000133170915],"category_scores_gemma":[0.000008865213,0.000088199966,0.00001723933,0.0004442754,0.000036877558,0.000011515411,0.00007542666,0.00014228346,0.0000296073],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.4373128e-7,0.000005392241,0.0017742481,0.000021247219,0.00006923242,0.0000012579314,0.000009402002,0.0029434457,6.07718e-7,0.002183369,0.96987075,0.023120828],"study_design_scores_gemma":[0.00004381719,0.000003208608,0.0015860298,0.000007814335,0.0000039324354,1.15888064e-7,0.0001321162,0.0025913082,0.000010228104,0.00019401402,0.99529845,0.00012894714],"about_ca_topic_score_codex":0.000077671895,"about_ca_topic_score_gemma":0.10448873,"teacher_disagreement_score":0.10441106,"about_ca_system_score_codex":0.000038662034,"about_ca_system_score_gemma":0.000003004369,"threshold_uncertainty_score":0.911852},"labels":[],"label_agreement":null},{"id":"W6996312988","doi":"","title":"Schneider Electric partners with NAIT's Centre for Grid Innovation to bring energy solutions to Alberta businesses","year":2021,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Electric energy; Grid; Government (linguistics); Electricity; Work (physics)","score_opus":0.013995434349399065,"score_gpt":0.22174276666339532,"score_spread":0.20774733231399625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996312988","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000103705504,0.0004012312,0.39289016,0.0013999146,0.0016909076,0.00063457916,0.000012936048,0.0008151245,0.60205144],"genre_scores_gemma":[0.0018393671,0.00011410516,0.014907255,0.0011348436,0.0015832981,0.00030754946,0.0005297058,0.00094605057,0.9786378],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856186,0.000008616569,0.00024958458,0.00042473956,0.00020434245,0.00055085396],"domain_scores_gemma":[0.9992734,0.000039330673,0.000043578548,0.0004084015,0.00014374475,0.00009154679],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004921597,0.00036841698,0.00030492834,0.0009823812,0.00004823963,0.000084354935,0.00018294062,0.00013848978,0.0010321619],"category_scores_gemma":[0.000058842958,0.00036335568,0.00004184005,0.0026063838,0.0000064936335,0.000052804917,0.00009060522,0.0000739845,0.000050158473],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048973275,0.000015233389,0.00001896562,0.00013469197,0.00021545718,0.0000027201104,0.000012314681,0.19815414,0.00021890065,0.011937149,0.787908,0.0013775008],"study_design_scores_gemma":[0.00020351508,0.000019199753,0.00008099239,0.00024930507,0.000049863105,0.0000021884741,0.000024087265,0.003891832,0.00084767654,0.000008420032,0.99411094,0.00051196635],"about_ca_topic_score_codex":0.0022493012,"about_ca_topic_score_gemma":0.024589594,"teacher_disagreement_score":0.3779829,"about_ca_system_score_codex":0.00019764087,"about_ca_system_score_gemma":0.000053573418,"threshold_uncertainty_score":0.99988186},"labels":[],"label_agreement":null},{"id":"W6996684765","doi":"","title":"Sony and Hydro-Quebec Announce the Establishment of a Joint Venture to Start Development of a Large-Scale Energy Storage System for Power Grids - Today's Market News (MARKCOMM) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Start up; Joint venture; Power (physics); Energy storage; Joint (building); High energy; Energy (signal processing); Power grid","score_opus":0.005918200475240354,"score_gpt":0.1859514800951668,"score_spread":0.18003327961992643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996684765","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027961577,0.0025019466,0.48568678,0.0005199976,0.0040975073,0.0030606627,0.00045170114,0.00081466965,0.5000706],"genre_scores_gemma":[0.07314545,0.0002921585,0.05068623,0.0010261218,0.001242452,0.0018726152,0.00040161266,0.0020227998,0.86931056],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976384,0.000079323065,0.00077310455,0.00048781888,0.0004870481,0.0005342851],"domain_scores_gemma":[0.99851245,0.00006388391,0.00025497787,0.0009384603,0.00006399207,0.00016623357],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00056836865,0.0005755534,0.0008845381,0.00036030728,0.000057981724,0.000054365482,0.00045391216,0.0002588305,0.0006626192],"category_scores_gemma":[0.000016260647,0.00043674186,0.00015458715,0.00023138068,0.00003871959,0.000055348177,0.0003288582,0.00013763121,0.0000047841318],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040531326,0.00006273083,0.0000223418,0.0012997745,0.00045541572,0.000002064879,0.00074031187,0.01027018,0.000118838616,0.00074237946,0.9844196,0.0018258715],"study_design_scores_gemma":[0.0006134381,0.00006776018,0.00014897427,0.0007279405,0.000074165946,0.0000018650172,0.0012045116,0.0058575096,0.0005383127,0.0000042994293,0.9902909,0.00047032302],"about_ca_topic_score_codex":0.002327764,"about_ca_topic_score_gemma":0.039947603,"teacher_disagreement_score":0.43500054,"about_ca_system_score_codex":0.00035734568,"about_ca_system_score_gemma":0.00008113434,"threshold_uncertainty_score":0.99980843},"labels":[],"label_agreement":null},{"id":"W6999031394","doi":"","title":"Canada Invests in Smart Grid Technology for London Net-Zero Energy Community","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Energy (signal processing); Renewable energy; Work (physics); Field (mathematics)","score_opus":0.008109563580769814,"score_gpt":0.17551723129814356,"score_spread":0.16740766771737375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999031394","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000078572455,0.000993045,0.013673775,0.0010583714,0.0029942745,0.00040511836,0.00010533895,0.0016225659,0.97906893],"genre_scores_gemma":[0.034466144,0.0014113814,0.010818853,0.007941894,0.0016843191,0.0015385852,0.001748325,0.0038267435,0.93656373],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99900055,0.000033804175,0.00026761665,0.00020190864,0.00012663206,0.00036949827],"domain_scores_gemma":[0.9992401,0.000047304584,0.000044781813,0.0005767498,0.000008619005,0.00008246633],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000065864726,0.00033581784,0.00041040487,0.00042162792,0.000028161225,0.000012617344,0.00053179637,0.00031612915,0.00031058],"category_scores_gemma":[0.000028417213,0.00036905296,0.000039767543,0.00038948737,0.00003356767,0.000017700395,0.00018812405,0.0004055217,0.000008535618],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019130443,0.000009370074,0.00014551906,0.00017833967,0.00009543021,0.00001478409,0.0000045284282,0.00874038,0.000011345878,0.0054036523,0.98417294,0.001221818],"study_design_scores_gemma":[0.0003182558,0.000021716378,0.00006307724,0.00006308772,0.000013524872,0.0000011097657,0.000017391902,0.004323288,0.00027075867,0.0002260222,0.9943321,0.00034969058],"about_ca_topic_score_codex":0.87275434,"about_ca_topic_score_gemma":0.9943336,"teacher_disagreement_score":0.121579245,"about_ca_system_score_codex":0.0003224134,"about_ca_system_score_gemma":0.00011472895,"threshold_uncertainty_score":0.99987614},"labels":[],"label_agreement":null},{"id":"W6999134313","doi":"","title":"City of Vancouver Neighbourhood Energy Utility Converts SHARC Pilot Program to Lease","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lease; Pilot program; Neighbourhood (mathematics); Energy (signal processing); Electric utility; Work (physics)","score_opus":0.015877406938231437,"score_gpt":0.2112926896493206,"score_spread":0.19541528271108916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999134313","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001489454,0.00012439305,0.018497208,0.000070221016,0.0017598699,0.00046219214,0.0000564301,0.001886011,0.9771288],"genre_scores_gemma":[0.1811745,0.00012052828,0.005023914,0.0007537722,0.0008947728,0.00036942196,0.000112527254,0.0010841475,0.8104664],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985268,0.00002251873,0.00031971984,0.0004404985,0.00033191292,0.00035854618],"domain_scores_gemma":[0.9989897,0.000016309774,0.00005931051,0.00063212204,0.00002750786,0.00027505186],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000053572523,0.00042101456,0.00051927235,0.00020170632,0.000012150567,0.000019859915,0.00038225236,0.00014837515,0.026351025],"category_scores_gemma":[0.00001894363,0.00042078932,0.00010470989,0.00035186677,0.000034945257,0.000034709992,0.00021575126,0.00013947039,0.000119908225],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013423493,0.00012772255,0.00014615904,0.00035077194,0.00026909832,0.000013806845,0.000009490075,0.0007846472,0.0000146707225,0.00073964265,0.98528826,0.012242331],"study_design_scores_gemma":[0.00031325474,0.00016279587,0.00033090622,0.00007820781,0.00005013389,2.2013263e-7,0.000007661668,0.011649665,0.00056575314,0.000029125771,0.9863883,0.00042394316],"about_ca_topic_score_codex":0.001994273,"about_ca_topic_score_gemma":0.00648524,"teacher_disagreement_score":0.18115962,"about_ca_system_score_codex":0.00006591989,"about_ca_system_score_gemma":0.000026526228,"threshold_uncertainty_score":0.9998244},"labels":[],"label_agreement":null},{"id":"W6999138661","doi":"","title":"Canadian Solar rolls out new grid-tied residential energy storage solution (NASDAQ:CSIQ)","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Solar energy; Renewable energy; Production (economics); Energy (signal processing); Energy storage","score_opus":0.008930062842016457,"score_gpt":0.18864710997278336,"score_spread":0.17971704713076692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999138661","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000043220743,0.0007404772,0.03153659,0.00032312024,0.020021826,0.00024037728,0.00010301883,0.005355644,0.94167465],"genre_scores_gemma":[0.0008404,0.0007077398,0.00045348072,0.0001836604,0.006126721,0.00004335104,0.00024317557,0.002288107,0.9891134],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99787754,0.000035851663,0.00033606545,0.00050298386,0.0004076953,0.0008398875],"domain_scores_gemma":[0.9986362,0.00001956962,0.00006297373,0.00075276877,0.000016765523,0.00051172636],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001279486,0.0005357738,0.0004408059,0.0011481988,0.0000710536,0.00011531599,0.00046426512,0.0005461177,0.0060806437],"category_scores_gemma":[0.000018989136,0.0006115508,0.00016835521,0.00030130398,0.000020251407,0.000097461416,0.00010852611,0.0002451585,0.0020058362],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017325534,0.0000034282675,0.0000056163994,0.000035555862,0.00032014187,0.00008116602,0.000027519949,0.06478081,0.000018606494,0.0005726399,0.9326823,0.0014705338],"study_design_scores_gemma":[0.0003026818,0.000012209231,0.00006000059,0.000086935564,0.000083542145,0.0000012652059,0.000014266069,0.009924048,0.00013001444,0.000059369562,0.98868394,0.00064171193],"about_ca_topic_score_codex":0.76071805,"about_ca_topic_score_gemma":0.9845219,"teacher_disagreement_score":0.22380388,"about_ca_system_score_codex":0.0010690263,"about_ca_system_score_gemma":0.00022838665,"threshold_uncertainty_score":0.9996336},"labels":[],"label_agreement":null},{"id":"W6999302391","doi":"","title":"City of Vancouver Neighbourhood Energy Utility Converts SHARC Pilot Program to Lease","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lease; Pilot program; Neighbourhood (mathematics); Energy (signal processing); Electric utility; Work (physics)","score_opus":0.015877406938231437,"score_gpt":0.2112926896493206,"score_spread":0.19541528271108916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999302391","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001489454,0.00012439305,0.018497208,0.000070221016,0.0017598699,0.00046219214,0.0000564301,0.001886011,0.9771288],"genre_scores_gemma":[0.1811745,0.00012052828,0.005023914,0.0007537722,0.0008947728,0.00036942196,0.000112527254,0.0010841475,0.8104664],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985268,0.00002251873,0.00031971984,0.0004404985,0.00033191292,0.00035854618],"domain_scores_gemma":[0.9989897,0.000016309774,0.00005931051,0.00063212204,0.00002750786,0.00027505186],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000053572523,0.00042101456,0.00051927235,0.00020170632,0.000012150567,0.000019859915,0.00038225236,0.00014837515,0.026351025],"category_scores_gemma":[0.00001894363,0.00042078932,0.00010470989,0.00035186677,0.000034945257,0.000034709992,0.00021575126,0.00013947039,0.000119908225],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013423493,0.00012772255,0.00014615904,0.00035077194,0.00026909832,0.000013806845,0.000009490075,0.0007846472,0.0000146707225,0.00073964265,0.98528826,0.012242331],"study_design_scores_gemma":[0.00031325474,0.00016279587,0.00033090622,0.00007820781,0.00005013389,2.2013263e-7,0.000007661668,0.011649665,0.00056575314,0.000029125771,0.9863883,0.00042394316],"about_ca_topic_score_codex":0.001994273,"about_ca_topic_score_gemma":0.00648524,"teacher_disagreement_score":0.18115962,"about_ca_system_score_codex":0.00006591989,"about_ca_system_score_gemma":0.000026526228,"threshold_uncertainty_score":0.9998244},"labels":[],"label_agreement":null},{"id":"W6999486366","doi":"","title":"Contrasting of VivoPower International PLC (VVPR) and Canadian Solar Inc. (NASDAQ:CSIQ)","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Legislation; Production (economics)","score_opus":0.003835640217593323,"score_gpt":0.17340927594207098,"score_spread":0.16957363572447764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999486366","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013903047,0.0002995353,0.0016473861,0.000046608617,0.0022044089,0.00014022915,0.000057327667,0.00017654095,0.9952889],"genre_scores_gemma":[0.07649757,0.00031668224,0.0018062185,0.00022965214,0.00072918105,0.000017261948,0.00012577226,0.0006617723,0.91961586],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930596,0.000006092934,0.0001662611,0.00016846349,0.00014298032,0.00021025354],"domain_scores_gemma":[0.99963164,0.000018955225,0.000040288665,0.0001968157,0.000018977875,0.00009330134],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000647369,0.00018939986,0.000217582,0.00038734038,0.000009679077,0.00002363664,0.00018101509,0.00015475263,0.0033328428],"category_scores_gemma":[0.000012394276,0.00019623165,0.000027470956,0.000047577152,0.000023209908,0.00003435714,0.000053679436,0.00011124586,0.000105678766],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011675539,0.0000049794294,0.00057661283,0.00012770797,0.00043841737,0.000009388219,0.000034386085,0.003819948,0.00007723943,0.0024532254,0.9911612,0.0012956873],"study_design_scores_gemma":[0.00021850923,0.00000682935,0.000315793,0.000097735254,0.000018818599,0.0000016115972,0.00003396456,0.012011023,0.000072790994,0.000005786275,0.98700356,0.00021359543],"about_ca_topic_score_codex":0.052021883,"about_ca_topic_score_gemma":0.12562415,"teacher_disagreement_score":0.07635854,"about_ca_system_score_codex":0.00009305981,"about_ca_system_score_gemma":0.000028874558,"threshold_uncertainty_score":0.99757826},"labels":[],"label_agreement":null},{"id":"W6999991877","doi":"","title":"Dimming for peak demand reduction","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reduction (mathematics); Peak demand; Energy consumption; Noise reduction; Demand reduction","score_opus":0.006205601776175193,"score_gpt":0.1969084676861277,"score_spread":0.1907028659099525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999991877","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8395161,0.00002146132,0.06369008,0.0002869735,0.0057132933,0.0002190088,0.0000021015626,0.00054766337,0.09000328],"genre_scores_gemma":[0.9877101,0.0000057162197,0.010984858,0.000009515178,0.00059974456,0.000052494805,0.000005058395,0.000020947164,0.0006115702],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968004,0.0000019467836,0.00006711696,0.00007751623,0.00005065506,0.00012270515],"domain_scores_gemma":[0.9998123,0.000010757962,0.00000695352,0.00013223634,0.000010927319,0.000026844507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007887249,0.00005499673,0.000048498663,0.00003697975,0.000035002147,0.000015413843,0.000058417347,0.000030633466,0.00009604552],"category_scores_gemma":[0.000013246955,0.00005796073,0.000024371691,0.0000422065,0.000009012615,0.000059250076,0.000012118585,0.00006530541,0.000022037248],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004900119,0.00001033529,0.00007149798,0.000060540973,0.000036417667,8.948092e-7,0.0001329434,0.03882258,0.8809061,0.012271736,0.045679968,0.022002101],"study_design_scores_gemma":[0.0005462968,0.000030557607,0.0030531057,0.000014491607,0.000038875503,0.000011217182,0.000079790356,0.17011435,0.13375972,0.0070870407,0.68492997,0.0003346044],"about_ca_topic_score_codex":0.0000011918919,"about_ca_topic_score_gemma":0.0000075359685,"teacher_disagreement_score":0.74714637,"about_ca_system_score_codex":0.000013458775,"about_ca_system_score_gemma":0.0000018324794,"threshold_uncertainty_score":0.23635699},"labels":[],"label_agreement":null},{"id":"W7000942583","doi":"","title":"Impact of P2P power trading on rooftop PV in Alberta","year":2018,"lang":"en","type":"dissertation","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Renewable energy; Government (linguistics); Production (economics); Power grid","score_opus":0.004187841221169708,"score_gpt":0.20720017070346497,"score_spread":0.20301232948229525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000942583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8205869,0.00005635986,0.000020673457,0.000004209202,0.0009268737,0.00021907184,0.00003291257,0.00012571347,0.17802726],"genre_scores_gemma":[0.9852011,0.000038886097,0.00008454007,0.000008600795,0.00011074517,0.0000047011895,0.0010810095,0.00015201948,0.013318354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9980822,0.000015932857,0.0004891205,0.00047360774,0.00039333286,0.00054579345],"domain_scores_gemma":[0.99898094,0.00006073669,0.00023483053,0.00049825356,0.00007702875,0.0001481905],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000114169125,0.0005838687,0.00063013553,0.0012434371,0.000057191155,0.000025386431,0.000475563,0.00040834493,0.0014258098],"category_scores_gemma":[0.000030171142,0.0006443806,0.0003936787,0.0007790389,0.000042168762,0.00028437353,0.000035064175,0.00042048705,0.00007747749],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003804955,0.0016683724,0.17638487,0.002935749,0.008776994,0.0023711685,0.051016122,0.4488546,0.0060550747,0.026330616,0.2643258,0.00747566],"study_design_scores_gemma":[0.00847467,0.0038884198,0.7982268,0.0057212464,0.0012373888,0.000028645407,0.01119033,0.04236251,0.013065469,0.00074492977,0.1073987,0.0076608877],"about_ca_topic_score_codex":0.0017739754,"about_ca_topic_score_gemma":0.002476279,"teacher_disagreement_score":0.6218419,"about_ca_system_score_codex":0.00063253636,"about_ca_system_score_gemma":0.000080460544,"threshold_uncertainty_score":0.99960077},"labels":[],"label_agreement":null},{"id":"W7002330071","doi":"","title":"Non-take-up of benefits at the start of the COVID-19 pandemic","year":2021,"lang":"en","type":"book","venue":"University of Salford Institutional Repository (University of Salford)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pandemic; Surprise; Quarter (Canadian coin); Government (linguistics); Coronavirus disease 2019 (COVID-19); Mindset; Psychological intervention; Conditionality; Process (computing)","score_opus":0.01972277769609035,"score_gpt":0.17221574771029743,"score_spread":0.15249297001420709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002330071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54432523,0.002620013,0.006200914,0.00034498548,0.0037786628,0.0012395359,0.0014721857,0.00022266888,0.43979582],"genre_scores_gemma":[0.5319073,0.003498345,0.0011150849,0.000099879864,0.00021599505,4.0948584e-7,0.0006060796,0.00008484951,0.46247205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979878,0.000057121728,0.00038799277,0.00039850254,0.0008972734,0.00027127363],"domain_scores_gemma":[0.99770474,0.00017601452,0.0006698466,0.00090838526,0.0003890523,0.00015193918],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002641391,0.00035782802,0.00070217584,0.0002775184,0.00069248915,0.0000055864625,0.001398977,0.00039937074,0.00026333932],"category_scores_gemma":[0.00003165788,0.00038081635,0.0006475002,0.0003651093,0.00206411,0.0002587643,0.001000985,0.00041460947,0.000007227827],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006189437,0.00019351691,0.008979851,0.0030672268,0.0027918948,0.00021722906,0.004125279,0.8260727,0.0037702597,0.033502605,0.11576506,0.00089546066],"study_design_scores_gemma":[0.0032296076,0.00019519539,0.017276695,0.0013240203,0.0014559374,0.0001344407,0.00547556,0.0025097313,0.0017176372,0.0003631295,0.96538395,0.0009340701],"about_ca_topic_score_codex":0.0011618222,"about_ca_topic_score_gemma":0.0015983727,"teacher_disagreement_score":0.8496189,"about_ca_system_score_codex":0.001495501,"about_ca_system_score_gemma":0.0016035935,"threshold_uncertainty_score":0.9998644},"labels":[],"label_agreement":null},{"id":"W7007950934","doi":"","title":"Alpha Technologies solves the power issue with Indoor DAS Networks by... -- VANCOUVER, British Columbia, June 5, 2012 /PRNewswire/ --","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Alpha (finance); Relation (database); Key (lock)","score_opus":0.002784693069844434,"score_gpt":0.1714399559762865,"score_spread":0.16865526290644206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007950934","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000025945576,0.02751238,0.015333263,0.00015617146,0.008160013,0.0009320437,0.000047898826,0.0070505776,0.9407817],"genre_scores_gemma":[0.0021539824,0.0035283177,0.0014991758,0.00018957988,0.0007785469,0.0002844598,0.00006228771,0.0011142765,0.99038935],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99785763,0.000025546567,0.00031932085,0.00047682525,0.00038120337,0.0009394619],"domain_scores_gemma":[0.9985776,0.000047611593,0.00012417855,0.0011322519,0.000026127464,0.00009225421],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00015321173,0.00052351423,0.00057585497,0.00011488143,0.00010967212,0.00035046734,0.00090199953,0.0006899722,0.013965739],"category_scores_gemma":[0.000009199641,0.000527052,0.000100118166,0.00038369434,0.00025089877,0.00019378736,0.00030490564,0.0006099059,0.00024658235],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018297708,0.000041396375,0.00030065767,0.000057221765,0.0005271835,0.000016564189,0.000011495386,0.0024020965,0.000001736446,0.000031072635,0.98746717,0.0091415625],"study_design_scores_gemma":[0.00036576376,0.000030985226,0.00010605933,0.00020117647,0.00011176714,0.00001067718,0.00025551574,0.0006122331,0.000012337246,0.000013252049,0.9975034,0.00077684777],"about_ca_topic_score_codex":0.011359769,"about_ca_topic_score_gemma":0.36841223,"teacher_disagreement_score":0.35705248,"about_ca_system_score_codex":0.000101349724,"about_ca_system_score_gemma":0.000013500045,"threshold_uncertainty_score":0.9997181},"labels":[],"label_agreement":null},{"id":"W7008200559","doi":"","title":"BuildingIQ Delivered More than $1 Million in Free Cash Flow in First Quarter Based on Energy Savings - retrofit","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cash flow; Quarter (Canadian coin); Energy (signal processing); Flow (mathematics); Energy consumption; Cash","score_opus":0.0063718205874367774,"score_gpt":0.1825927169744054,"score_spread":0.17622089638696864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008200559","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010756649,0.0011207104,0.0051130312,0.0005868203,0.0026891262,0.00037980895,0.00011067843,0.0012160698,0.9877081],"genre_scores_gemma":[0.11103623,0.0009328229,0.017217783,0.0016143697,0.0025609054,0.00053036277,0.0012673067,0.0039907466,0.86084944],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99823916,0.000034236953,0.00033419245,0.0004751733,0.00041646874,0.0005007906],"domain_scores_gemma":[0.9988798,0.000035925026,0.000049524348,0.0009055822,0.000017945795,0.00011120779],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017947699,0.0005041384,0.00045728212,0.0012486208,0.000012151348,0.000033348322,0.00046577438,0.0004793435,0.0015617304],"category_scores_gemma":[0.000025677682,0.00052522414,0.00008132302,0.0005028412,0.000024125335,0.000061538834,0.00009047702,0.00027788326,0.00007219452],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010135529,0.000025281552,0.00033171754,0.000077413795,0.000025193696,0.00008311959,0.00004167498,0.30340788,0.0000029128414,0.00008155825,0.6956663,0.00024680703],"study_design_scores_gemma":[0.0012625083,0.00005081556,0.0006037035,0.00067080767,0.000014139398,0.0000010463311,0.00004146499,0.36013842,0.000039790495,0.0000315485,0.63655543,0.00059031893],"about_ca_topic_score_codex":0.010847829,"about_ca_topic_score_gemma":0.07694344,"teacher_disagreement_score":0.12685862,"about_ca_system_score_codex":0.0006308736,"about_ca_system_score_gemma":0.000020594438,"threshold_uncertainty_score":0.9997199},"labels":[],"label_agreement":null},{"id":"W7008645755","doi":"","title":"Chesapeake Utilities Corporation Reports Third Quarter 2020 Results","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Corporation; Corporate governance","score_opus":0.009269128731543324,"score_gpt":0.18090335637825453,"score_spread":0.1716342276467112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008645755","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000003984817,0.00020976197,0.0029312582,0.00031038633,0.002633709,0.00023558595,0.000031972835,0.0027474954,0.99089587],"genre_scores_gemma":[0.0041478085,0.00017120231,0.0016375629,0.00021209738,0.0016611452,0.00005016378,0.00060927036,0.0005067749,0.991004],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99871635,0.000015810188,0.00042237111,0.00037787735,0.0002603693,0.00020722642],"domain_scores_gemma":[0.99922395,0.000013684329,0.00011989358,0.0005503366,0.0000109707835,0.00008116489],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009114226,0.00032093166,0.00030004414,0.00010965361,0.000015521948,0.000058842732,0.0001184307,0.00021811448,0.0017122081],"category_scores_gemma":[0.00002180726,0.00031571634,0.00007922274,0.00014288544,0.000022473569,0.00005690472,0.000047352954,0.00017143345,0.0003951692],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004255781,0.000004745712,0.000012639702,0.0001320782,0.00011886065,0.00014362532,0.00006370016,0.002277377,0.000006018505,0.000489361,0.9965982,0.0001491834],"study_design_scores_gemma":[0.00013022825,0.000018932775,0.00011536268,0.00005870689,0.000029800074,0.0000067188716,0.00005593493,0.0045486633,0.00006179909,0.00007737983,0.99456686,0.00032959055],"about_ca_topic_score_codex":0.00019414334,"about_ca_topic_score_gemma":0.00061463384,"teacher_disagreement_score":0.004143824,"about_ca_system_score_codex":0.00005045768,"about_ca_system_score_gemma":0.000012871263,"threshold_uncertainty_score":0.9999295},"labels":[],"label_agreement":null},{"id":"W7010187875","doi":"","title":"Global Grid Connected PV Systems Market 2018-2022 with Canadian Solar, Hanwha Group, Huawei Technologies, JA SOLAR, JinkoSolar &amp;amp; Trina Solar Dominating","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Photovoltaic system; Grid; Dominating set; Renewable energy; Grid-connected photovoltaic power system","score_opus":0.007814164632473681,"score_gpt":0.189143517919482,"score_spread":0.18132935328700833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010187875","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024173544,0.004745578,0.04174741,0.00016382006,0.00797917,0.0024376265,0.0008965188,0.009864021,0.9319241],"genre_scores_gemma":[0.0055065146,0.0019318358,0.026024163,0.00020895363,0.0032156566,0.0011293746,0.0020477623,0.003245144,0.9566906],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.993989,0.0002013677,0.0009715695,0.001530486,0.0010181341,0.002289449],"domain_scores_gemma":[0.99612534,0.0001063489,0.0003965761,0.0026361307,0.0001675815,0.00056803913],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.000929692,0.0017326145,0.0015703765,0.0014859128,0.00037598124,0.0005433343,0.0018852447,0.0017058802,0.0052946266],"category_scores_gemma":[0.00021506313,0.0016437987,0.00024078823,0.0015578673,0.00031562318,0.00029234015,0.00050542655,0.00091358897,0.0015440916],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037332586,0.000055775923,0.0012461625,0.00087101123,0.0016089237,0.0001581499,0.000022192862,0.0013043206,0.00002934246,0.00055449805,0.99267673,0.0014355464],"study_design_scores_gemma":[0.0013521255,0.00011796889,0.00017357689,0.0009476892,0.00032025104,0.00010964293,0.00028528975,0.0054339725,0.000034742076,0.000024595938,0.98910606,0.0020941002],"about_ca_topic_score_codex":0.13739172,"about_ca_topic_score_gemma":0.68133396,"teacher_disagreement_score":0.5439423,"about_ca_system_score_codex":0.0023258545,"about_ca_system_score_gemma":0.0002619052,"threshold_uncertainty_score":0.9995901},"labels":[],"label_agreement":null},{"id":"W7014096232","doi":"","title":"Ontario invests in energate to lead smart grid consumer engagement","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lead (geology); Key (lock); Customer engagement; Government (linguistics); Work (physics); Smart grid","score_opus":0.019593826771571114,"score_gpt":0.20611076391400535,"score_spread":0.18651693714243422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014096232","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005571961,0.0005201728,0.0009123168,0.000060927796,0.004551708,0.0004092048,0.0000068382556,0.00073930266,0.99224234],"genre_scores_gemma":[0.0020801164,0.00014622285,0.0035749376,0.0005676,0.00061971997,0.00021423117,0.000067533685,0.0006561079,0.99207354],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998483,0.00003897829,0.0003021157,0.00033510078,0.00024500664,0.0005958158],"domain_scores_gemma":[0.99916,0.000017976054,0.00003195801,0.00059795147,0.000007479029,0.00018462188],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00021576775,0.0004568841,0.00039344624,0.00064768415,0.000015309573,0.000032000065,0.00029394316,0.0002121047,0.017489022],"category_scores_gemma":[0.0000068145487,0.0004679893,0.00006246232,0.000200595,0.00002004417,0.000050555525,0.00019134562,0.00034918578,0.0040705292],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017554466,0.000027328128,0.0033601278,0.00008099875,0.00016679375,0.00001579945,0.00016754064,0.008284506,0.000024592096,0.0007739634,0.98569626,0.0014003399],"study_design_scores_gemma":[0.00025448517,0.000009606278,0.002641406,0.000116859526,0.000031348638,7.285589e-7,0.000013081586,0.0001224393,0.00016330632,0.000005579338,0.9960941,0.0005470803],"about_ca_topic_score_codex":0.045464955,"about_ca_topic_score_gemma":0.54982394,"teacher_disagreement_score":0.504359,"about_ca_system_score_codex":0.00057132303,"about_ca_system_score_gemma":0.000029365952,"threshold_uncertainty_score":0.9997772},"labels":[],"label_agreement":null},{"id":"W7014242400","doi":"","title":"Ottawa storm 2022: Manotick man powers neighbourhood with 'microgrid' house","year":2022,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Storm; Neighbourhood (mathematics); Work (physics); Population","score_opus":0.0032989511550598756,"score_gpt":0.16395078979221298,"score_spread":0.1606518386371531,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014242400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013206742,0.00096782437,0.001086883,0.00008569971,0.0018318698,0.0004017532,0.000033807366,0.0050013675,0.9904587],"genre_scores_gemma":[0.0026104867,0.00047011924,0.0026191606,0.00048461754,0.0007050384,0.00017344124,0.00013395367,0.0037724562,0.9890307],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99827486,0.000023105407,0.00022756893,0.00046709928,0.00045902046,0.00054832967],"domain_scores_gemma":[0.9988524,0.000014505261,0.00006971759,0.0009216263,0.000008509574,0.00013324324],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000085170606,0.00056996074,0.0004068409,0.0005180705,0.000051955783,0.00006256264,0.00052829826,0.00016878328,0.12566338],"category_scores_gemma":[0.0000026298364,0.00053217623,0.00010594026,0.00032765282,0.00003749866,0.000051289477,0.00019355636,0.0004204961,0.00076926034],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040884706,0.0000341275,0.000358226,0.00012702464,0.00060397224,0.000138897,0.000032230295,0.022917863,0.000010236026,0.0009402675,0.9740039,0.0008291619],"study_design_scores_gemma":[0.0005020248,0.0000706885,0.00042859724,0.000036904108,0.00010180001,0.000011575725,0.00014528928,0.00042683748,0.000030580886,0.0000024956253,0.9975122,0.00073097757],"about_ca_topic_score_codex":0.00057030784,"about_ca_topic_score_gemma":0.0034287297,"teacher_disagreement_score":0.12489413,"about_ca_system_score_codex":0.00036508564,"about_ca_system_score_gemma":0.000020870139,"threshold_uncertainty_score":0.999713},"labels":[],"label_agreement":null},{"id":"W7014839477","doi":"","title":"PSE&amp;amp;G residential electric bills to increase 2.1 percent on June 1","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Government (linguistics); Consumption (sociology); Payment; Quarter (Canadian coin)","score_opus":0.015549563390816666,"score_gpt":0.23373742951217277,"score_spread":0.2181878661213561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014839477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041927022,0.00032918536,0.0027557586,0.00013755442,0.0030133948,0.00047036688,0.00002152156,0.0017380285,0.9911149],"genre_scores_gemma":[0.00042707918,0.00024855437,0.0017841579,0.00037431414,0.0018153589,0.000066347035,0.00016486402,0.00090129685,0.99421805],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981611,0.000040971725,0.00026955162,0.00045197402,0.0005556641,0.000520742],"domain_scores_gemma":[0.99864745,0.000021621947,0.000036773097,0.0009269738,0.000030512678,0.0003366592],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001771553,0.00048677996,0.0003952305,0.0010303634,0.000022432741,0.000063442785,0.0003895028,0.00025179033,0.011652697],"category_scores_gemma":[0.00005397275,0.0004521019,0.000088622684,0.000538172,0.00001027777,0.000028884402,0.00012995368,0.00024068629,0.019560415],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000131959805,0.000035032794,0.0000037992413,0.000049245737,0.00013720576,0.000012201698,0.00002108201,0.018950934,0.00022596553,0.00018316448,0.97988564,0.00048253936],"study_design_scores_gemma":[0.00026368164,0.00002427048,0.00003408053,0.000094285984,0.000056507903,0.0000025132606,0.000004088859,0.00016687518,0.00010865276,0.000014727162,0.99867874,0.00055154675],"about_ca_topic_score_codex":0.0018827963,"about_ca_topic_score_gemma":0.0065213838,"teacher_disagreement_score":0.018793136,"about_ca_system_score_codex":0.00036853855,"about_ca_system_score_gemma":0.00003493503,"threshold_uncertainty_score":0.99979305},"labels":[],"label_agreement":null},{"id":"W7015722515","doi":"","title":"Traditional Belgian beers and Canadian Microbrewery, can GCxGC taste the difference?","year":2016,"lang":"en","type":"other","venue":"Open Repository and Bibliography (University of Liège)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Taste; Wine tasting; Bitter taste","score_opus":0.010095169903172536,"score_gpt":0.16141907788644366,"score_spread":0.15132390798327114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015722515","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010579613,0.0018248754,0.00021428631,0.0012981095,0.0008650454,0.0006173395,0.0006632096,0.00012872046,0.9838088],"genre_scores_gemma":[0.70550567,0.0128256325,0.00077755185,0.00020774503,0.00038475462,0.000005190536,0.00010537806,0.00023270448,0.2799554],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992688,0.00004121513,0.00008617851,0.00025680842,0.00013235987,0.00021468103],"domain_scores_gemma":[0.9994157,0.000028054745,0.00007017243,0.00026124725,0.00001880484,0.0002060408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007956207,0.00020775026,0.00023387282,0.0050656856,0.0002656963,0.00011138706,0.0004976549,0.0001542169,0.0003090591],"category_scores_gemma":[3.731647e-8,0.00018317443,0.00008229039,0.0014852892,0.00030970047,0.00009980467,0.00013282764,0.00012620488,0.000002925445],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008057163,0.000011739144,0.020110633,0.0001026057,0.0005861129,0.00006192152,0.00014708423,0.000009095182,0.0002567908,0.0005594079,0.9778063,0.0003402482],"study_design_scores_gemma":[0.0009416798,0.00008644981,0.3216437,0.00064565823,0.0003689661,0.000059418922,0.0007998906,0.00006182519,0.00008534599,0.00013511088,0.67433965,0.0008322662],"about_ca_topic_score_codex":0.1765788,"about_ca_topic_score_gemma":0.06507597,"teacher_disagreement_score":0.7038534,"about_ca_system_score_codex":0.00002062083,"about_ca_system_score_gemma":0.000033728164,"threshold_uncertainty_score":0.9519839},"labels":[],"label_agreement":null},{"id":"W7016123489","doi":"","title":"Wharfedale Technologies Secures a Multi-Year Contract to Provide SAP HANA(r) Support Services to a Multi-Billion Dollar Renewable Energy Company in Western Canada","year":2014,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Liberian dollar; Government (linguistics); Production (economics); Boom","score_opus":0.006994421299627064,"score_gpt":0.19979122456402404,"score_spread":0.19279680326439697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016123489","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013587885,0.0064278953,0.32234254,0.0045878533,0.015050798,0.014761629,0.001608881,0.03698363,0.5846489],"genre_scores_gemma":[0.21928488,0.00050347636,0.029391335,0.0027588026,0.0005185005,0.0014486444,0.00035117613,0.002055504,0.7436877],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974119,0.000038999977,0.00052932865,0.00073764543,0.00043607753,0.00084601704],"domain_scores_gemma":[0.99865615,0.000030247968,0.00010461939,0.00095577084,0.000044426626,0.00020877646],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015669575,0.00071366224,0.00083786866,0.0008805586,0.000036357655,0.000118662734,0.0008718332,0.0004194228,0.00030135157],"category_scores_gemma":[0.000023232202,0.0006887467,0.00006889002,0.0004909114,0.000021335227,0.000085702086,0.00035975032,0.00020847128,0.00009216725],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001846541,0.000069830756,0.0042583547,0.0005839346,0.00018319319,0.00009969189,0.0001233518,0.39288846,0.00036024547,0.000058381094,0.6004216,0.000934495],"study_design_scores_gemma":[0.0008075894,0.000051451887,0.00091474166,0.00045139293,0.000027682761,0.0000024451024,0.00032766347,0.019131767,0.0014063594,0.0000016181939,0.9760142,0.00086311734],"about_ca_topic_score_codex":0.8859665,"about_ca_topic_score_gemma":0.99860483,"teacher_disagreement_score":0.37559256,"about_ca_system_score_codex":0.0005123203,"about_ca_system_score_gemma":0.000116463336,"threshold_uncertainty_score":0.99955636},"labels":[],"label_agreement":null},{"id":"W7017749371","doi":"","title":"Building Demand Response and the Electric Grid: Development and Application of an Operational Cross-Sectoral Model of Building-Side Electrification and Supply-Side Renewable Energy Integration","year":2023,"lang":"en","type":"dissertation","venue":"UVic’s Research and Learning Repository (University of Victoria)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Renewable energy; Demand response; Electricity; Electricity retailing; Supply and demand; Variable renewable energy; Electricity generation; Electricity demand","score_opus":0.013816409341049668,"score_gpt":0.2569302205220447,"score_spread":0.24311381118099507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017749371","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9832437,0.000863499,0.015321581,0.000015667478,0.00010039447,0.00024600467,0.0000032472287,0.00004969335,0.00015620887],"genre_scores_gemma":[0.9951902,0.0007577525,0.0024529926,7.8678596e-7,0.000074633324,0.000012186024,0.00014356655,0.000031588308,0.001336316],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827397,0.00032702734,0.0003050523,0.00038121155,0.0004865806,0.00022616705],"domain_scores_gemma":[0.9987248,0.00042808673,0.00018555822,0.00018433736,0.0003836245,0.00009356722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016251928,0.00018080938,0.00031000408,0.00056147965,0.0005853555,0.000092181086,0.00017497267,0.00020477823,0.0000011267152],"category_scores_gemma":[0.00014820909,0.00019342912,0.000028786591,0.0004239954,0.00017928674,0.00026677066,0.000055006443,0.0003860578,1.2302597e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025855452,0.00003896981,0.0021099385,0.00053900044,0.00021031483,0.000003836771,0.0049160765,0.25124505,0.73120856,0.0022788318,0.0000808261,0.004783059],"study_design_scores_gemma":[0.0012068365,0.00027548338,0.06707044,0.0001874253,0.00006432409,0.000006169973,0.0016747344,0.80327046,0.12478091,0.0005190954,0.00066962285,0.00027449775],"about_ca_topic_score_codex":0.0021627601,"about_ca_topic_score_gemma":0.0007851389,"teacher_disagreement_score":0.60642767,"about_ca_system_score_codex":0.0001344508,"about_ca_system_score_gemma":0.00014754152,"threshold_uncertainty_score":0.78878105},"labels":[],"label_agreement":null},{"id":"W7019224430","doi":"","title":"Federal and Manitoba Government teaming up to help farms and other organizations switch to renewable energyPR NewswireToday at 5:30pm UTC","year":2024,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Renewable energy; Work (physics); Public policy","score_opus":0.00596016302383263,"score_gpt":0.19034297530310113,"score_spread":0.1843828122792685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019224430","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002397498,0.0010184664,0.022028107,0.00049398217,0.002549438,0.00061258505,0.000071546616,0.0014302108,0.96939814],"genre_scores_gemma":[0.0057777227,0.00018062329,0.0020922339,0.00100375,0.0007534421,0.00009448891,0.000014315324,0.0011735939,0.98890984],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983749,0.000012855331,0.00025000752,0.0005922478,0.00035932846,0.00041065994],"domain_scores_gemma":[0.9992584,0.000016022044,0.000034896926,0.00042259326,0.000013444268,0.000254643],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000075543976,0.0004807067,0.00034131907,0.00020810521,0.000074234464,0.00022799699,0.00016722183,0.00018520621,0.0018135549],"category_scores_gemma":[0.000018722596,0.0004583547,0.00003119323,0.00037287982,0.000014561148,0.000037970778,0.0005267136,0.00009981704,0.00052027416],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031266336,0.000007306382,0.0005331179,0.00019150178,0.00024009503,0.000013090187,0.00025850578,0.018861657,0.00060460536,0.00071330176,0.9776938,0.0008799006],"study_design_scores_gemma":[0.0001735125,0.000029935494,0.00008306583,0.00021903303,0.00005651501,0.0000093605495,0.00039814325,0.0010667499,0.0009993644,0.000028263086,0.9963545,0.0005815557],"about_ca_topic_score_codex":0.003843596,"about_ca_topic_score_gemma":0.039266568,"teacher_disagreement_score":0.03542297,"about_ca_system_score_codex":0.00050894317,"about_ca_system_score_gemma":0.000009287787,"threshold_uncertainty_score":0.9997868},"labels":[],"label_agreement":null},{"id":"W7019780134","doi":"","title":"IEEE SmartGridComm 2013 to Explore the Sustainable Growth of Today’s Electric Grids from October 21 – 24 in Vancouver, Canada","year":2013,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Sustainable development; Grid; Work (physics); Electric utility","score_opus":0.006960139141704068,"score_gpt":0.1706800716892099,"score_spread":0.16371993254750583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019780134","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004045966,0.0021471048,0.0023864827,0.0005049525,0.011237056,0.0016664406,0.000033626173,0.00055043615,0.97742796],"genre_scores_gemma":[0.011299768,0.00064186245,0.0004373573,0.0004645509,0.0007613564,0.00044318545,0.00003637387,0.00069196074,0.9852236],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790984,0.000048729915,0.0004239683,0.0003860567,0.00046010202,0.0007713264],"domain_scores_gemma":[0.99874306,0.00011357079,0.00007824202,0.00086483813,0.00006225009,0.00013805814],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000115275325,0.00050891156,0.000556363,0.0004773772,0.000028393786,0.000034894154,0.0007792341,0.00020931709,0.0037284058],"category_scores_gemma":[0.000027700518,0.00039669065,0.000076515316,0.0007557112,0.0000172456,0.00008142184,0.00016677602,0.00034837995,0.00009268439],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031119962,0.00001718482,0.000205468,0.00013697088,0.00016137338,0.000024185427,0.000057674086,0.021646466,0.000018636145,0.00049971486,0.97709715,0.00013208743],"study_design_scores_gemma":[0.00027971156,0.00002082433,0.00037920996,0.0000845067,0.000036561694,2.7065877e-7,0.00044624222,0.002458814,0.0006450439,0.00009370814,0.9950355,0.00051959476],"about_ca_topic_score_codex":0.9547099,"about_ca_topic_score_gemma":0.96328384,"teacher_disagreement_score":0.019187652,"about_ca_system_score_codex":0.0007029044,"about_ca_system_score_gemma":0.00016359852,"threshold_uncertainty_score":0.9998485},"labels":[],"label_agreement":null},{"id":"W7024254717","doi":"","title":"Reaction mechanisms of the O2 reduction/evolution reaction","year":2003,"lang":"en","type":"other","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reaction mechanism; Mechanism (biology); Oxygen; Reactivity (psychology); Chemical reaction; Reaction conditions","score_opus":0.00618955429425034,"score_gpt":0.177743562969174,"score_spread":0.17155400867492368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024254717","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000095128395,0.000057267127,0.015551532,0.00004805512,0.0069956854,0.00022405804,0.000005827801,0.0004295698,0.9765929],"genre_scores_gemma":[0.09281601,0.00039064858,0.004225169,0.000021062075,0.0011741619,0.00011662123,0.00003267981,0.00079769315,0.900426],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992575,0.000033832002,0.00016737438,0.00016721823,0.00023313664,0.00014096116],"domain_scores_gemma":[0.99939567,0.0000048939737,0.00011020772,0.00044921413,0.0000174861,0.00002250771],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000095658856,0.00016914828,0.00015066669,0.0001832058,0.000028376731,0.0000059682125,0.00011789881,0.00020366315,0.00049594644],"category_scores_gemma":[0.0000124383405,0.0001505621,0.00008003623,0.00022812154,0.000022703476,0.000041992986,0.000019590965,0.00017369067,0.00006567432],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029033065,0.000017776149,0.0000013854925,0.00010089126,0.000110666755,3.4886656e-7,0.00001287472,0.0024498277,0.20215434,0.020982295,0.7731723,0.0009943696],"study_design_scores_gemma":[0.00019442575,0.000019507735,0.0002030232,0.00018320668,0.00012298471,0.000015578406,0.00005883457,0.0009122401,0.021898719,0.012233211,0.9638648,0.0002934818],"about_ca_topic_score_codex":0.00008826542,"about_ca_topic_score_gemma":0.000035546796,"teacher_disagreement_score":0.19069247,"about_ca_system_score_codex":0.00027854127,"about_ca_system_score_gemma":0.000011809628,"threshold_uncertainty_score":0.61397445},"labels":[],"label_agreement":null},{"id":"W7024592710","doi":"","title":"$530,000.00 in Sales Expected for Ideal Power Inc (IPWR) This Quarter","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Ideal (ethics); Power (physics); Measure (data warehouse)","score_opus":0.009052250526501186,"score_gpt":0.21986699313234678,"score_spread":0.2108147426058456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024592710","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000068353256,0.00068128004,0.0033723924,0.000060178,0.0020907847,0.00047009654,0.00004244756,0.0010555696,0.9921589],"genre_scores_gemma":[0.010247468,0.00017950554,0.0032003,0.00010777819,0.0008073764,0.0003784661,0.00018208129,0.000912121,0.9839849],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99883837,0.000013781951,0.00023920034,0.0003310561,0.00017039209,0.00040719332],"domain_scores_gemma":[0.99908704,0.00003111292,0.00005902706,0.00074591266,0.000014152543,0.000062775776],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000091720794,0.0003826611,0.00041739526,0.00045576037,0.000027273587,0.000063547035,0.00041433956,0.0003324881,0.0071009626],"category_scores_gemma":[0.00001710544,0.00036647025,0.00009418344,0.00006096168,0.00002903256,0.000062476676,0.000071610615,0.00015898689,0.0004722005],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048127363,0.000015389704,0.000083151266,0.00010668467,0.00014006285,0.000011974934,0.00007837961,0.0007324008,0.000019868045,0.0006823771,0.9977522,0.00037268625],"study_design_scores_gemma":[0.0005424051,0.000023948487,0.00063179247,0.00015275345,0.00001681285,7.4358144e-7,0.00003406781,0.0019513415,0.000029117742,0.000032701984,0.99612623,0.00045805535],"about_ca_topic_score_codex":0.00073733664,"about_ca_topic_score_gemma":0.0039671585,"teacher_disagreement_score":0.0101791145,"about_ca_system_score_codex":0.000109550325,"about_ca_system_score_gemma":0.000010862043,"threshold_uncertainty_score":0.9998787},"labels":[],"label_agreement":null},{"id":"W7024794331","doi":"","title":"Six Natural Resource Projects in Canada That Got it Right in 2017","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Natural resource; Resource (disambiguation); Government (linguistics); Natural (archaeology); Production (economics)","score_opus":0.009008714425738674,"score_gpt":0.18420793835411675,"score_spread":0.17519922392837808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024794331","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00047287522,0.00036801555,0.000012559005,0.000098624696,0.001617843,0.00026910007,0.000004320808,0.00019140066,0.9969653],"genre_scores_gemma":[0.026372166,0.000059675003,0.00025815822,0.0002222173,0.0004282504,0.000047649282,0.000038377242,0.0003588808,0.97221464],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988886,0.00002067525,0.00016676051,0.00027928947,0.0002474281,0.00039722837],"domain_scores_gemma":[0.99946713,0.000020007863,0.00003254777,0.0004312631,0.0000040638297,0.000044980225],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007325806,0.00029142573,0.00027325496,0.00037508697,0.000008746669,0.000019374464,0.0003434344,0.00013861028,0.0027979624],"category_scores_gemma":[0.00000767979,0.0002624041,0.00002446054,0.000190435,0.000015784175,0.000031779688,0.00008901375,0.00023311557,0.00015063172],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016566702,0.000003604588,0.0006806388,0.000082914965,0.000031343297,0.00016201058,0.00002237388,0.00343429,8.7565655e-7,0.00004531534,0.99542207,0.000112881404],"study_design_scores_gemma":[0.0002269118,0.0000033883844,0.0011344017,0.00022006048,0.000004555951,0.0000022378201,0.00005927723,0.004775821,0.000042324085,0.0000019093384,0.9931914,0.00033766218],"about_ca_topic_score_codex":0.89229125,"about_ca_topic_score_gemma":0.9990237,"teacher_disagreement_score":0.10673243,"about_ca_system_score_codex":0.00092478085,"about_ca_system_score_gemma":0.00011537884,"threshold_uncertainty_score":0.99998283},"labels":[],"label_agreement":null},{"id":"W7026712169","doi":"","title":"BluWave-ai Deploys First Ever Automated Real-time AI Energy Dispatch in a Canadian Electrical Utility, Powered by Microsoft Azure","year":2019,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Automation; Electric energy; Energy consumption; Electricity","score_opus":0.002420968379302536,"score_gpt":0.18669573804550552,"score_spread":0.184274769666203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7026712169","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00023352006,0.001128457,0.0015748547,0.000918393,0.001404063,0.0007719206,0.00026617665,0.0078111277,0.98589146],"genre_scores_gemma":[0.03898393,0.0012014838,0.0006873617,0.0014742707,0.00027758643,0.00015786287,0.0010773584,0.0021308176,0.95400935],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9969674,0.00005885743,0.00047142088,0.0007790543,0.0003484981,0.0013747811],"domain_scores_gemma":[0.99831295,0.0000482114,0.000058198722,0.0010775591,0.000028321969,0.0004747323],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00012400014,0.0007750067,0.0007582904,0.0009724494,0.000038332164,0.00010916812,0.0007426082,0.0009310535,0.0034063992],"category_scores_gemma":[0.000019478737,0.0008210342,0.00014118229,0.0007817612,0.000031812386,0.000092147464,0.00013710801,0.00042063204,0.00090646266],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000420346,0.00004286543,0.00096722716,0.00009623601,0.00022555924,0.00006761763,0.000016192353,0.001982195,0.00012489318,0.00032350858,0.9959898,0.00015971543],"study_design_scores_gemma":[0.00046436294,0.000020497697,0.0009282054,0.00009297307,0.000028465383,0.0000045177353,0.0000011560588,0.19681206,0.00011642835,0.0000090753965,0.80076545,0.0007568089],"about_ca_topic_score_codex":0.732755,"about_ca_topic_score_gemma":0.84286714,"teacher_disagreement_score":0.19522434,"about_ca_system_score_codex":0.0010989741,"about_ca_system_score_gemma":0.0002217228,"threshold_uncertainty_score":0.99987143},"labels":[],"label_agreement":null},{"id":"W7027702422","doi":"","title":"Demand side management for the future smart grid","year":2015,"lang":"en","type":"other","venue":"cIRcle (University of British Columbia)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Power grid; Nucleofection; Work (physics); Filter (signal processing); Production (economics); Focus (optics)","score_opus":0.005285106904134186,"score_gpt":0.1523199190272967,"score_spread":0.1470348121231625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027702422","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001234749,0.009078348,0.011898154,0.00019303699,0.0070121475,0.0019770071,0.0013164189,0.0011813993,0.96610874],"genre_scores_gemma":[0.009958804,0.0071637686,0.003092647,0.0000972294,0.0021302283,0.000018297866,0.0003951267,0.0006936542,0.97645026],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990412,0.000016662154,0.000099609475,0.00030468917,0.00025943952,0.00027839417],"domain_scores_gemma":[0.9992767,0.000021391625,0.00007248756,0.0004937632,0.00004865471,0.000087032895],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015684428,0.00009466915,0.00029905833,0.00007856855,0.0000980425,0.000067959794,0.0005569891,0.00018381151,0.0002932283],"category_scores_gemma":[0.0000025488055,0.00028049413,0.00013786045,0.00018705682,0.000095838775,0.000062913045,0.00017209216,0.00012438744,0.00004809717],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022654658,0.000015241696,0.00003830905,0.00039936608,0.00044979647,0.000059963742,0.000019010027,0.0013112767,3.8057016e-7,0.000004299677,0.8805857,0.11711443],"study_design_scores_gemma":[0.00073905406,0.000018786599,0.05734588,0.00020697976,0.00025414245,0.000007351344,0.000636742,0.0009850438,3.706345e-8,0.000052764855,0.9394694,0.000283798],"about_ca_topic_score_codex":0.01072031,"about_ca_topic_score_gemma":0.38446584,"teacher_disagreement_score":0.37374553,"about_ca_system_score_codex":0.000105129475,"about_ca_system_score_gemma":0.000015396326,"threshold_uncertainty_score":0.9999647},"labels":[],"label_agreement":null},{"id":"W7030136537","doi":"","title":"Maxim Power Corp. Announces 2016 First Quarter Financial and Operating Results - Energy (ENERGY01) News","year":2016,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maxim; Quarter (Canadian coin); Power (physics); Energy (signal processing); Electric energy","score_opus":0.004690209428985653,"score_gpt":0.1792979899735063,"score_spread":0.17460778054452064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030136537","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000051674793,0.0008385847,0.0027192363,0.00031494236,0.0021252,0.00012045132,0.00010797646,0.00089362386,0.9928283],"genre_scores_gemma":[0.0019070677,0.0020509122,0.00092868495,0.00031926768,0.0012701856,0.00007151517,0.000071440714,0.00049807294,0.99288285],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982502,0.00002447083,0.0004120925,0.0005587737,0.00025761954,0.000496864],"domain_scores_gemma":[0.99917686,0.000043743265,0.000089221445,0.0005411338,0.000022664537,0.00012636482],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008872313,0.00056141143,0.0004541974,0.00026924626,0.00007565935,0.00010433544,0.0002791828,0.0003665253,0.005269936],"category_scores_gemma":[0.000018834411,0.0004219469,0.000068688205,0.00010067804,0.00006423717,0.00011678626,0.00012706766,0.00011504157,0.00044376362],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009377995,0.000010244565,0.000016334194,0.000049386395,0.00009886781,0.00001848941,0.000027382797,0.000576899,0.000016510068,0.0009698837,0.99658054,0.0016261023],"study_design_scores_gemma":[0.00065158325,0.00005820979,0.00008357021,0.00021392372,0.000032756998,0.0000041392314,0.000017033317,0.00052979984,0.000059638238,0.000018878116,0.9976863,0.0006441423],"about_ca_topic_score_codex":0.0010567406,"about_ca_topic_score_gemma":0.0040355455,"teacher_disagreement_score":0.0048261723,"about_ca_system_score_codex":0.0000739257,"about_ca_system_score_gemma":0.000028199454,"threshold_uncertainty_score":0.9998232},"labels":[],"label_agreement":null},{"id":"W7033434657","doi":"","title":"Portland General Electric Announces Second Quarter 2021 Results","year":2021,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Square (algebra)","score_opus":0.00541774029155144,"score_gpt":0.1858958635647787,"score_spread":0.18047812327322726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033434657","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000121288685,0.0031627535,0.00050574524,0.000047850906,0.0019006893,0.000110121146,0.000035406585,0.00039426837,0.9937219],"genre_scores_gemma":[0.00035088073,0.0006444534,0.0007049141,0.000089391164,0.002184432,0.000026724141,0.0005263498,0.00032614634,0.9951467],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879736,0.000019067296,0.0002581137,0.00036716473,0.00021083887,0.0003474796],"domain_scores_gemma":[0.9993782,0.000012422705,0.00004500782,0.00047925184,0.000015365571,0.00006973719],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007440069,0.00032214122,0.00031336708,0.00028157324,0.000015832064,0.000065154956,0.00017576014,0.00021865162,0.025290947],"category_scores_gemma":[0.0000047413305,0.00030453928,0.0000845955,0.00028478843,0.000008968207,0.000026164496,0.00003632396,0.00017317545,0.00023068367],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018191851,0.000008917051,0.000024593963,0.00007679441,0.00023945361,0.00007616663,0.000008482799,0.0030411296,0.0000786809,0.00011537541,0.99596536,0.0003632054],"study_design_scores_gemma":[0.0002846099,0.00001569419,0.00024823227,0.000045227334,0.000022171762,0.0000053886047,0.000009366899,0.0033135791,0.00015777293,0.0000074460227,0.99550235,0.00038817455],"about_ca_topic_score_codex":0.00011945219,"about_ca_topic_score_gemma":0.0018341289,"teacher_disagreement_score":0.025060264,"about_ca_system_score_codex":0.000055714656,"about_ca_system_score_gemma":0.000020249166,"threshold_uncertainty_score":0.9999407},"labels":[],"label_agreement":null},{"id":"W7034556726","doi":"","title":"Track Group Reports 2nd Quarter Fiscal 2018 Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Track (disk drive); Group (periodic table); Fiscal year; Tracking (education)","score_opus":0.006291238934231908,"score_gpt":0.18713025231820185,"score_spread":0.18083901338396993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7034556726","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005423387,0.00010473104,0.003951349,0.00005636218,0.00715714,0.00021063077,0.000020213478,0.0015956737,0.98684967],"genre_scores_gemma":[0.0006843497,0.000053054853,0.0021762406,0.00009423114,0.0051017986,0.000042471394,0.00016436323,0.0005702709,0.99111325],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99836075,0.000015272697,0.0004572485,0.0004906207,0.00027720112,0.00039889175],"domain_scores_gemma":[0.9989148,0.000013271453,0.00009430425,0.0008726351,0.000009788984,0.00009523229],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00016132525,0.00040074033,0.00034326108,0.00022469055,0.000024304476,0.000042282507,0.00018481488,0.00042572978,0.006114657],"category_scores_gemma":[0.000024560759,0.00037684568,0.00011649407,0.00012660776,0.00005151995,0.00004923916,0.000059053582,0.00015433949,0.0017479763],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066096954,0.00001866324,0.000022045111,0.00006071157,0.00006888699,0.00015156573,0.000016192838,0.0002771901,0.000003366423,0.0001284622,0.99885327,0.00039304726],"study_design_scores_gemma":[0.00026608544,0.00004423424,0.0010087161,0.000095043004,0.000031564494,0.000015936042,0.000004082008,0.00059276255,0.000022806125,0.00005256203,0.9974022,0.0004640089],"about_ca_topic_score_codex":0.00018101309,"about_ca_topic_score_gemma":0.0013750499,"teacher_disagreement_score":0.0043666805,"about_ca_system_score_codex":0.00007416725,"about_ca_system_score_gemma":0.000008356763,"threshold_uncertainty_score":0.99986833},"labels":[],"label_agreement":null},{"id":"W7036907979","doi":"","title":"DP World Selects TYCROP and Loop Energy for Solution to Decarbonize RTG Cranes at Port of Vancouver","year":2023,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Energy (signal processing); Control theory (sociology); Loop (graph theory); Energy consumption; Efficient energy use","score_opus":0.007472249235586778,"score_gpt":0.1940874686367784,"score_spread":0.1866152194011916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7036907979","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016347879,0.0009501052,0.056321077,0.00005512019,0.0043478217,0.0005232166,0.00003090686,0.002326673,0.9352816],"genre_scores_gemma":[0.0022511147,0.0002842052,0.0023466498,0.0000747951,0.00040095433,0.00013747787,0.00002021516,0.00091675256,0.9935678],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904346,0.0000059513823,0.00020875534,0.00028145284,0.00016196464,0.0002984325],"domain_scores_gemma":[0.999546,0.000041125055,0.00004456304,0.00026769776,0.000022563043,0.00007803879],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000064466454,0.00026531206,0.0003302855,0.00046435476,0.000018716426,0.000008958392,0.00010894466,0.00012781212,0.000380915],"category_scores_gemma":[0.000009233048,0.00026735122,0.00006244163,0.00031281172,0.000016499396,0.000023292432,0.00010030052,0.000040352683,0.000018034669],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008505278,0.0000068467643,0.000053268726,0.00022213445,0.00019679715,0.0000038123517,0.000007355048,0.01771274,0.00028315108,0.00047233596,0.9789963,0.0020368046],"study_design_scores_gemma":[0.00027531807,0.000025641883,0.000082462306,0.000115010655,0.00006237409,5.2467794e-7,0.000003991702,0.012199474,0.0020206647,0.000021497617,0.9848734,0.00031960118],"about_ca_topic_score_codex":0.00096770737,"about_ca_topic_score_gemma":0.16690587,"teacher_disagreement_score":0.16593817,"about_ca_system_score_codex":0.00012480533,"about_ca_system_score_gemma":0.000009600848,"threshold_uncertainty_score":0.9999779},"labels":[],"label_agreement":null},{"id":"W7037839128","doi":"","title":"First Nations fathering: A model to support the early formation of Aboriginal and Torres Strait Islander male-led families","year":2022,"lang":"en","type":"other","venue":"Minerva Access (University of Melbourne)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Gestational period; TSG101; Liquation; Dysgeusia; Diafiltration; Emperipolesis; Triacetin; Durvalumab","score_opus":0.014955806884416573,"score_gpt":0.2166205528332328,"score_spread":0.20166474594881623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7037839128","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19549698,0.0002693128,0.085948676,0.00055485073,0.0005072062,0.00087752414,0.00037631692,0.00029552434,0.7156736],"genre_scores_gemma":[0.70488924,0.0010627965,0.0035062376,0.000034710956,0.00013063598,0.000012134437,0.00010260866,0.00021789326,0.29004374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.999271,0.000015557425,0.00013097646,0.00015260217,0.00027410942,0.00015578161],"domain_scores_gemma":[0.999525,0.000031680447,0.000111071044,0.00025073733,0.000034333458,0.000047143218],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008952056,0.00017415022,0.00024104226,0.0004986929,0.00013544109,0.000029387476,0.00057682506,0.00007642973,0.0019153449],"category_scores_gemma":[0.0000052203764,0.00018178193,0.000068151785,0.00029332042,0.00005415994,0.0002773978,0.00021387888,0.000113034315,0.000004033615],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031200438,0.000052142997,0.0013736634,0.0010230705,0.00036834992,0.000015911883,0.00660468,0.69878286,0.00006759962,0.0022537815,0.2881301,0.0012966163],"study_design_scores_gemma":[0.0010596002,0.00010536885,0.0073616747,0.00021939192,0.00028023217,0.000008850756,0.004096191,0.23055327,0.00002973928,0.000062973435,0.75564593,0.00057676557],"about_ca_topic_score_codex":0.0012401066,"about_ca_topic_score_gemma":0.014004819,"teacher_disagreement_score":0.50939226,"about_ca_system_score_codex":0.00007142961,"about_ca_system_score_gemma":0.000023151399,"threshold_uncertainty_score":0.99899703},"labels":[],"label_agreement":null},{"id":"W7042047636","doi":"","title":"Ontario’s New 4-Year Plan Paves Way for Grid Flexibility &amp;amp; Renewable Microgrids","year":2017,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Plan (archaeology); Grid; Renewable energy; Key (lock)","score_opus":0.041501845805143996,"score_gpt":0.24891188621902863,"score_spread":0.20741004041388464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042047636","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000057835146,0.0005049925,0.041672233,0.000054454733,0.006301119,0.00068731804,0.00011984383,0.0013243245,0.9492779],"genre_scores_gemma":[0.000022201422,0.00014015795,0.049437176,0.000052782714,0.002633034,0.000087344175,0.00066083245,0.00059119234,0.94637525],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99829817,0.000012445738,0.00028520025,0.00058952736,0.0002191896,0.0005954481],"domain_scores_gemma":[0.99780416,0.000026835962,0.000102146245,0.0018418622,0.000019607334,0.00020539916],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00018593782,0.0005601256,0.00057020306,0.00020434483,0.000082557985,0.00014961761,0.00068966136,0.00041473503,0.010513219],"category_scores_gemma":[0.00002842969,0.00054005225,0.00022676893,0.00004683917,0.000047489957,0.000075417774,0.00015257241,0.00021141104,0.0007985313],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011672343,0.00002016032,0.00026212362,0.00022288128,0.00025769122,0.0000013720362,0.000041124178,0.007633718,0.000034516677,0.00016172575,0.9903501,0.0010028576],"study_design_scores_gemma":[0.0005215118,0.000014887463,0.00015357876,0.00013606747,0.00008008082,0.0000013808517,0.000004693101,0.00007233703,0.00017660462,0.0002333223,0.9979729,0.0006326047],"about_ca_topic_score_codex":0.14077947,"about_ca_topic_score_gemma":0.83211875,"teacher_disagreement_score":0.6913393,"about_ca_system_score_codex":0.0003766687,"about_ca_system_score_gemma":0.000092946204,"threshold_uncertainty_score":0.99997944},"labels":[],"label_agreement":null},{"id":"W7042280928","doi":"","title":"Ontario chooses Energate for Smart Grid consumer engagement","year":2012,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Customer engagement; Smart grid; Key (lock); Set (abstract data type); Context (archaeology)","score_opus":0.019609721445051298,"score_gpt":0.20581240555857463,"score_spread":0.18620268411352334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042280928","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000016499975,0.0012882113,0.011773757,0.00002226081,0.007766693,0.00056555547,0.000036845402,0.0012416006,0.9772886],"genre_scores_gemma":[0.000284579,0.00029921645,0.0067864093,0.0001527563,0.0015605196,0.00046261968,0.0002362198,0.00083380524,0.9893839],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987609,0.000015865193,0.00023854639,0.0002788873,0.00017971739,0.00052611437],"domain_scores_gemma":[0.99926054,0.000036109544,0.000048493966,0.0005186499,0.000013492145,0.00012273573],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00015323181,0.00044278844,0.00036035868,0.0002416829,0.000036366524,0.000037262605,0.00024231955,0.0002051622,0.028207762],"category_scores_gemma":[0.000005561735,0.00042252854,0.0001339299,0.000059617087,0.000022983879,0.000046095873,0.00009040639,0.00018700957,0.0009350154],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002210721,0.00002223096,0.000247332,0.00017240978,0.0005822837,0.0000016303698,0.000034048357,0.0015700513,0.000007794983,0.001775912,0.9934098,0.002174307],"study_design_scores_gemma":[0.00036688894,0.000011327929,0.00020299542,0.000055704913,0.00014971712,6.656342e-7,0.0000082421975,0.00019140166,0.00020813597,0.000013994547,0.9982756,0.00051532063],"about_ca_topic_score_codex":0.007962486,"about_ca_topic_score_gemma":0.06553181,"teacher_disagreement_score":0.057569325,"about_ca_system_score_codex":0.00027275388,"about_ca_system_score_gemma":0.000024305871,"threshold_uncertainty_score":0.9998429},"labels":[],"label_agreement":null},{"id":"W7043316312","doi":"","title":"Remote energy auditing: energy efficiency through smart thermostat data and control","year":2017,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Thermostat; Efficient energy use; Occupancy; Energy (signal processing); Audit; Control (management); Variety (cybernetics); Smart meter; Electricity meter","score_opus":0.020277562660423364,"score_gpt":0.23196234655760345,"score_spread":0.2116847838971801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043316312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018767988,0.0006100782,0.5098452,0.0013476054,0.0018365002,0.00010300261,0.00006637121,0.0005734939,0.46684977],"genre_scores_gemma":[0.9958762,0.00052366115,0.0020331633,0.00032482806,0.00035807607,0.000006457954,0.00003315616,0.000054305798,0.00079017045],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987958,0.000027334238,0.00020324995,0.00037999343,0.00021147296,0.00038214884],"domain_scores_gemma":[0.9979319,0.00006798702,0.000073447205,0.0018223972,0.000022717422,0.00008155205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001791905,0.00021237053,0.00021886818,0.000039985185,0.00029348864,0.0001707452,0.0009162945,0.000068265595,0.00011068712],"category_scores_gemma":[0.00008305697,0.00020517716,0.000030081688,0.000044884517,0.00011171873,0.00034631856,0.0004357467,0.00008496811,0.0000122822985],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086909364,0.00012084001,0.0014012431,0.00018690295,0.00087955873,0.0003116161,0.00053486717,0.036474828,0.05124996,0.13477121,0.16702986,0.6069522],"study_design_scores_gemma":[0.0007576298,0.00002402947,0.0011705126,0.00002983533,0.00003936061,0.000007978964,0.000020149962,0.54361135,0.002002878,0.00368153,0.4483671,0.0002876709],"about_ca_topic_score_codex":0.00029130315,"about_ca_topic_score_gemma":0.00014482628,"teacher_disagreement_score":0.9771082,"about_ca_system_score_codex":0.000034741293,"about_ca_system_score_gemma":0.000011582488,"threshold_uncertainty_score":0.8366882},"labels":[],"label_agreement":null},{"id":"W7046034331","doi":"","title":"Chesapeake Utilities Corporation Reports Second Quarter 2020 Results","year":2020,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Corporation; Corporate governance","score_opus":0.008296943059635365,"score_gpt":0.1745231706623019,"score_spread":0.16622622760266656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7046034331","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010556229,0.00020533748,0.0015437165,0.00016104964,0.0024911633,0.00022495983,0.000060184226,0.0019882622,0.99331474],"genre_scores_gemma":[0.0060963137,0.0000652049,0.0010531454,0.00018267211,0.0013770412,0.000041951665,0.00065506314,0.00050652935,0.99002206],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879956,0.000014002738,0.00040874167,0.0003705905,0.0002085398,0.00019855518],"domain_scores_gemma":[0.9992703,0.00001276604,0.00011582746,0.00050968997,0.000009757343,0.000081652885],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000079009675,0.00030871315,0.0002897459,0.0001088312,0.000013884968,0.00005715179,0.00010485055,0.00020356289,0.011659497],"category_scores_gemma":[0.000014128622,0.00031337,0.000072244045,0.00012328428,0.000020854734,0.00005863297,0.00004160068,0.00016002027,0.00036072484],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034486511,0.0000041067146,0.0000091300535,0.00017829862,0.00012445413,0.00013799265,0.000058555783,0.0010748085,0.000009309546,0.00027250318,0.99795204,0.00017532546],"study_design_scores_gemma":[0.00014128238,0.000017814582,0.00012982426,0.00004391047,0.000022784163,0.000007834164,0.000051678348,0.003016989,0.000103455044,0.000059593134,0.99608016,0.00032466793],"about_ca_topic_score_codex":0.000091921334,"about_ca_topic_score_gemma":0.0012845864,"teacher_disagreement_score":0.011298772,"about_ca_system_score_codex":0.000047906706,"about_ca_system_score_gemma":0.000012458792,"threshold_uncertainty_score":0.9999318},"labels":[],"label_agreement":null},{"id":"W7066856389","doi":"","title":"Impact of energy recovery technology on housing performance","year":2008,"lang":"en","type":"article","venue":"NPARC","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy recovery; Energy (signal processing); Production (economics); Energy consumption; Heat recovery ventilation; Efficient energy use","score_opus":0.009029316125571892,"score_gpt":0.19335136669593556,"score_spread":0.18432205057036366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066856389","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9388358,0.00002723602,0.0013924286,0.000015280828,0.00020240691,0.000019468807,0.0000011365621,0.00022735208,0.05927891],"genre_scores_gemma":[0.99861044,0.00033346578,0.0008151461,0.000012478999,0.000059072394,0.0000069184484,0.0000019044833,0.00002377473,0.0001367907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995229,0.0000041537055,0.000115292816,0.00008993681,0.00009188543,0.00017578648],"domain_scores_gemma":[0.9996978,0.000011443148,0.0000190108,0.0002356355,0.00001389211,0.000022227874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000026776537,0.00009466502,0.00011884363,0.00022873866,0.000029112249,0.000002277568,0.000105814666,0.000055979443,0.00008514107],"category_scores_gemma":[0.0000067194946,0.00008993909,0.00004929083,0.00024675473,0.000033312364,0.00005715449,0.000027085773,0.00006674547,0.000017143204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018178418,0.000030428177,0.011719007,0.000020005424,0.000090073474,0.000014827039,0.000020657248,0.93745244,0.017903373,0.0008048971,0.0065171295,0.025408963],"study_design_scores_gemma":[0.0016911104,0.0020283156,0.24376903,0.00026500953,0.00004823288,0.00010735078,0.000028487213,0.35893315,0.36129314,0.0020608886,0.028514111,0.0012611604],"about_ca_topic_score_codex":0.000007975413,"about_ca_topic_score_gemma":0.000001959941,"teacher_disagreement_score":0.5785193,"about_ca_system_score_codex":0.00010264002,"about_ca_system_score_gemma":0.000010142891,"threshold_uncertainty_score":0.36676097},"labels":[],"label_agreement":null},{"id":"W7067814802","doi":"","title":"North American Clean Energy - Schneider Electric Smart Grid Lab at Ryerson University's Centre for Urban Energy Officially Open","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Clean energy; Energy (signal processing); Electric energy; Electricity; Smart grid; Renewable energy; Efficient energy use","score_opus":0.00781437593587242,"score_gpt":0.17952172311689715,"score_spread":0.17170734718102473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7067814802","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009095761,0.00019253901,0.0065136696,0.00012847378,0.001381676,0.00041376927,0.0001967056,0.0014348747,0.9896473],"genre_scores_gemma":[0.0013002605,0.0005413289,0.0012082878,0.0003232841,0.0012103582,0.000014354956,0.0012435975,0.0010246296,0.9931339],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978096,0.00006291696,0.00026696138,0.00069346995,0.00035483812,0.0008122329],"domain_scores_gemma":[0.998652,0.00003985364,0.00017197356,0.00074342435,0.00008010932,0.0003126532],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000082980914,0.00065421156,0.0007231883,0.0006896126,0.000093688286,0.00008632346,0.0011902987,0.00020627734,0.00091839297],"category_scores_gemma":[0.000011050355,0.00072463683,0.00015509465,0.0010023173,0.000060694638,0.00011423279,0.00056166505,0.00014072443,0.00009241495],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058130332,0.000044139568,0.00031892088,0.000041772197,0.0005477898,0.000030321033,0.000017690334,0.0062916414,0.000005058859,0.006791622,0.9796235,0.006229415],"study_design_scores_gemma":[0.0007604429,0.00009476591,0.00013848257,0.000030713116,0.00014885592,0.0000015849245,0.00007957035,0.0054180855,0.00013475367,0.000005144509,0.99231493,0.00087265926],"about_ca_topic_score_codex":0.017560342,"about_ca_topic_score_gemma":0.42740873,"teacher_disagreement_score":0.4098484,"about_ca_system_score_codex":0.00070508826,"about_ca_system_score_gemma":0.00013100462,"threshold_uncertainty_score":0.9999949},"labels":[],"label_agreement":null},{"id":"W7071096418","doi":"","title":"Schneider Electric Smart Grid Lab at Ryerson University's Centre for Urban Energy officially open, available for testing and training - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Training (meteorology); Energy (signal processing); Smart grid; Electricity; Electric energy; Efficient energy use","score_opus":0.028882940833146343,"score_gpt":0.19422985072684387,"score_spread":0.16534690989369752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071096418","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000026042386,0.0013901831,0.015723445,0.000108179345,0.0014653737,0.00065787515,0.00021965099,0.0012326147,0.97917664],"genre_scores_gemma":[0.00013864198,0.00035084412,0.018393071,0.00023419307,0.0013870333,0.000047954094,0.00064176554,0.0009793198,0.9778272],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975511,0.00004547965,0.0003502505,0.0008455516,0.00025471547,0.00095291744],"domain_scores_gemma":[0.9986678,0.00023180207,0.00017826725,0.00049433135,0.00013164598,0.0002961489],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002114376,0.00070107233,0.000768016,0.00063887384,0.0001896156,0.00015665266,0.0006614841,0.0004434269,0.00084418734],"category_scores_gemma":[0.00009592335,0.0007860462,0.000117371594,0.0005984746,0.00003834535,0.00018360783,0.00038939752,0.000118642674,0.000016878956],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054397813,0.000024652401,0.000040830568,0.00014284119,0.00037682254,0.00001184382,0.000035537632,0.0063885883,0.00014087617,0.011803317,0.9746095,0.00637081],"study_design_scores_gemma":[0.0016226748,0.000107483436,0.0000026011721,0.00013658054,0.00018634262,0.000004775684,0.00012328822,0.056258332,0.00025247352,0.000057976893,0.94037366,0.0008738239],"about_ca_topic_score_codex":0.0070477794,"about_ca_topic_score_gemma":0.040735025,"teacher_disagreement_score":0.049869742,"about_ca_system_score_codex":0.00042958217,"about_ca_system_score_gemma":0.00021242109,"threshold_uncertainty_score":0.99956435},"labels":[],"label_agreement":null},{"id":"W7083851493","doi":"","title":"Asteroids are smacking Earth twice as often as before","year":2019,"lang":"en","type":"other","venue":"Internet Archive (Internet Archive)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asteroid; Near-Earth object; Impact crater; Falling (accident); Earth (classical element)","score_opus":0.007739262025604555,"score_gpt":0.20742090095625326,"score_spread":0.19968163893064872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7083851493","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002659541,0.00056647457,0.015483964,0.00010801573,0.004491876,0.0010545552,0.00035980938,0.0018947329,0.97338104],"genre_scores_gemma":[0.019803384,0.00025259904,0.0016317164,0.0007241214,0.0018013362,0.00016461177,0.0007316392,0.0020830696,0.9728075],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99538344,0.00021085014,0.0008803293,0.001416657,0.0007978347,0.0013109093],"domain_scores_gemma":[0.9973559,0.00018452128,0.000418611,0.0015825736,0.00003310821,0.00042533438],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00017476807,0.0014820931,0.0012564721,0.0013323373,0.00002866732,0.0002794807,0.0021152042,0.00034203794,0.008747917],"category_scores_gemma":[0.000049257134,0.001514044,0.00061896263,0.00019398019,0.0002730353,0.00015903801,0.001203151,0.0013825262,0.026989449],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001054891,0.00006961431,0.0004982262,0.00063026766,0.0015758642,0.00039744648,0.0019683389,0.0021998582,0.00013992554,0.0056158025,0.985683,0.0011161573],"study_design_scores_gemma":[0.0009100991,0.00046311095,0.00066726794,0.0029600349,0.0001634483,0.00009644947,0.00011458222,0.01699402,0.00037426446,0.0013069273,0.9746227,0.0013270784],"about_ca_topic_score_codex":0.008045133,"about_ca_topic_score_gemma":0.02114482,"teacher_disagreement_score":0.018241532,"about_ca_system_score_codex":0.00011651672,"about_ca_system_score_gemma":0.00005718182,"threshold_uncertainty_score":0.9997928},"labels":[],"label_agreement":null},{"id":"W7084390676","doi":"10.1007/978-3-031-95288-3_29","title":"Development of a Screw-Glued Timber-to-Timber Connection for Use in the Manufacturing of Mass Timber Composite Panels","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Clamping; Adhesive; Stiffness; Connection (principal bundle); Composite number; Shear (geology); Ductility (Earth science); Failure mechanism","score_opus":0.015057525170131624,"score_gpt":0.20546450009616693,"score_spread":0.1904069749260353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084390676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012547358,0.00027581185,0.97153664,0.0000459762,0.0009839707,0.0013208317,0.0000449919,0.00019822546,0.013046179],"genre_scores_gemma":[0.84688455,0.000058850477,0.15040688,0.00013376807,0.00025248164,0.00035560844,0.00016894596,0.0002965439,0.0014423918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979645,0.000013830976,0.0008482956,0.0004029316,0.00033447728,0.00043597977],"domain_scores_gemma":[0.9985557,0.0007238472,0.00011094976,0.0005088669,0.00005162598,0.000049012313],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034510283,0.00058283895,0.0007260291,0.00087006093,0.000029313887,0.000034770343,0.00036815897,0.00036704508,0.0000437858],"category_scores_gemma":[0.00008060007,0.00056299235,0.00016367325,0.00018787218,0.000019185727,0.00008286818,0.00010745171,0.0005257962,0.000004006289],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030364465,0.000013107629,0.00003235139,0.0010909664,0.0002166386,0.000009179956,0.0005814925,0.9939397,0.0016747292,0.00068784587,0.000085550215,0.0016381007],"study_design_scores_gemma":[0.0020765131,0.00009544834,0.0031690048,0.00622771,0.00029824313,0.00001379331,0.000022332806,0.7487129,0.12668958,0.0011228833,0.109290116,0.0022814404],"about_ca_topic_score_codex":0.000027600605,"about_ca_topic_score_gemma":0.0008663769,"teacher_disagreement_score":0.8343372,"about_ca_system_score_codex":0.00036387905,"about_ca_system_score_gemma":0.000030291714,"threshold_uncertainty_score":0.9996821},"labels":[],"label_agreement":null},{"id":"W7086977029","doi":"10.1109/access.2025.3620234","title":"Practical Method for Behind-the-Meter Solar PV Disaggregation","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University; Fraser Health","funders":"Agência Nacional de Energia Elétrica; Fundação de Amparo à Pesquisa do Estado do Rio Grande do Sul; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Photovoltaic system; Prosumer; Smart grid; Electricity generation; Probabilistic logic; Cluster analysis; Distributed generation; Energy consumption; Grid","score_opus":0.035302297875338944,"score_gpt":0.3703338004916926,"score_spread":0.33503150261635367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7086977029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037034594,0.00004334861,0.9871662,0.0021875151,0.0022398226,0.0002826025,0.0000032010744,0.0001821574,0.0041916748],"genre_scores_gemma":[0.90791976,0.00005577026,0.08541022,0.0018001653,0.0010488892,0.0008978283,0.00002594244,0.00008034516,0.002761045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993504,0.000034014287,0.0001613381,0.00015464138,0.00010990899,0.00018964586],"domain_scores_gemma":[0.9992824,0.00034391254,0.000024251112,0.0002905228,0.000033940865,0.00002496533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030479746,0.000106889354,0.00010862256,0.000078074736,0.00007980943,0.00015799039,0.0002776387,0.000054332613,0.000023417395],"category_scores_gemma":[0.00009149045,0.00008701243,0.00006035825,0.0001492263,0.000014630598,0.0003628421,0.00005727338,0.000104433326,0.000013878584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046402478,0.00006523187,0.0007826632,0.0003164459,0.0005877872,0.00000681917,0.00018992356,0.5125294,0.0021583766,0.011683589,0.40801954,0.06361386],"study_design_scores_gemma":[0.00060669915,0.000020929412,0.002187997,0.000044006036,0.0002066495,0.0000020336593,0.000032834338,0.64296407,0.08368948,0.004507208,0.2654744,0.00026371534],"about_ca_topic_score_codex":0.00002088065,"about_ca_topic_score_gemma":0.000047755835,"teacher_disagreement_score":0.90421635,"about_ca_system_score_codex":0.000058086356,"about_ca_system_score_gemma":0.000011479821,"threshold_uncertainty_score":0.35482636},"labels":[],"label_agreement":null},{"id":"W7092362345","doi":"10.5281/zenodo.17382703","title":"Evaluating the Effectiveness of Muti-Sector Demand Response in Energy Planning Models (New England Networks)","year":2025,"lang":"","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Demand response; Energy demand; Demand forecasting; Energy (signal processing); New england; Raw data","score_opus":0.047909975397354906,"score_gpt":0.28177583889727836,"score_spread":0.23386586349992344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7092362345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046391316,0.009508099,0.76916915,0.00033941583,0.004198236,0.0059446385,0.14296314,0.0019333927,0.01955258],"genre_scores_gemma":[0.5648399,0.0019944122,0.0002994168,0.00009395136,0.000958563,0.0000015193954,0.4280913,0.0031645414,0.00055638753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.98916996,0.007137405,0.0009845662,0.0009556677,0.0008769738,0.00087540806],"domain_scores_gemma":[0.9961475,0.0013029979,0.00031170007,0.0015789235,0.000442213,0.00021666934],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.010443725,0.0006059884,0.0007164471,0.0010439019,0.0013608221,0.00072324375,0.002668421,0.00032729295,0.0017283908],"category_scores_gemma":[0.0028099227,0.0006052703,0.00014823215,0.0019675344,0.00019098475,0.0003176455,0.0035646989,0.0009999501,0.00007847031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0036927662,0.000092790186,0.0000013636395,0.00071148993,0.00031701056,0.00003978698,0.00040178807,0.8157793,0.00040192093,0.00068390975,0.16957837,0.00829948],"study_design_scores_gemma":[0.0021607345,0.0005870444,0.0004198155,0.001345039,0.000115416406,0.000023045226,0.000078795034,0.4673366,0.00012113308,0.00016644583,0.52723306,0.00041288443],"about_ca_topic_score_codex":0.00028654755,"about_ca_topic_score_gemma":0.0000033016697,"teacher_disagreement_score":0.76886976,"about_ca_system_score_codex":0.00074552215,"about_ca_system_score_gemma":0.000034992823,"threshold_uncertainty_score":0.99993926},"labels":[],"label_agreement":null},{"id":"W7096361348","doi":"","title":"SMART GRIDS AND THE CANADIAN RESIDENTIAL CONSUMER: ISSUES AND PROSPECTS SMART GRIDS AND THE CANADIAN RESIDENTIAL CONSUMER:","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Smart grid; Software; Grid; Enthusiasm; Key (lock)","score_opus":0.007258425118049049,"score_gpt":0.1996222891787073,"score_spread":0.19236386406065825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096361348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79709524,0.047563434,0.000091167916,0.02761443,0.0075541735,0.00372424,0.00011144888,0.0006418846,0.11560399],"genre_scores_gemma":[0.994067,0.0016282533,0.0001637609,0.0006846108,0.00056887686,0.00011076831,0.0000174588,0.00006749238,0.0026917662],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99766105,0.00018462437,0.0003928212,0.00036658323,0.00036063488,0.0010342996],"domain_scores_gemma":[0.9982699,0.00020214375,0.000047893394,0.0005576936,0.00006679044,0.0008555476],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012887971,0.00039850824,0.00042355104,0.00030066635,0.0010586792,0.00070067256,0.00028261426,0.00018028115,0.00022754935],"category_scores_gemma":[0.00013686648,0.00027283074,0.000060516075,0.00022983404,0.0012199814,0.00035992614,0.00016948408,0.0003732695,0.00004826458],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002788355,0.000022527009,0.3500675,0.00028621787,0.0015760243,0.00012388609,0.0049474225,0.00048728107,0.000048649756,0.25560355,0.38421613,0.002341962],"study_design_scores_gemma":[0.007476046,0.000039021437,0.40567517,0.000078343546,0.00061663386,0.00021094803,0.00068302144,0.0053627053,0.000519256,0.0015044244,0.5767064,0.0011280059],"about_ca_topic_score_codex":0.96296936,"about_ca_topic_score_gemma":0.9974091,"teacher_disagreement_score":0.25409913,"about_ca_system_score_codex":0.00025306558,"about_ca_system_score_gemma":0.00020691763,"threshold_uncertainty_score":0.9999724},"labels":[],"label_agreement":null},{"id":"W7097879403","doi":"","title":"The Impact of Electricity Pricing Schemes on Storage Adoption","year":2012,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity pricing; Subsidy; Grid; Peak load; Energy storage; Peak demand; Electricity market; Electricity retailing","score_opus":0.009798236322358447,"score_gpt":0.22935291445072253,"score_spread":0.2195546781283641,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097879403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9509712,0.0001890663,0.016419422,0.000008585432,0.00020244277,0.00006495202,2.555632e-7,0.00014458294,0.03199949],"genre_scores_gemma":[0.9994534,0.00005151243,0.0001850983,0.0000056482627,0.000108385706,0.0000050033755,8.684925e-7,0.000011961136,0.00017811962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995608,0.000010238535,0.00008995956,0.000039637074,0.00009730552,0.00020210842],"domain_scores_gemma":[0.9997396,0.000045949833,0.00001608313,0.00015705187,0.000010814403,0.000030508585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016684379,0.00007118001,0.000060224567,0.000045461213,0.000034503162,0.000009047765,0.00006929214,0.000020324678,0.000032013326],"category_scores_gemma":[0.000016852324,0.000043555683,0.000046574984,0.00014480713,0.0000069098105,0.00008508951,0.000014573885,0.000060480234,0.000021835118],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011791467,0.000049614267,0.010660548,0.00001756085,0.0001435094,2.3110196e-7,0.000086004904,0.9512327,0.0076596504,0.011102076,0.009088894,0.009947459],"study_design_scores_gemma":[0.00035498556,0.00019012317,0.5432731,0.000023516537,0.000028171851,0.0000016154514,0.00007908686,0.3607651,0.081738584,0.00006680411,0.013143325,0.000335573],"about_ca_topic_score_codex":0.000038936174,"about_ca_topic_score_gemma":0.000002217838,"teacher_disagreement_score":0.5904676,"about_ca_system_score_codex":0.00012817788,"about_ca_system_score_gemma":0.000002843813,"threshold_uncertainty_score":0.17761493},"labels":[],"label_agreement":null},{"id":"W7100432710","doi":"","title":"On Animates and Other Worldly Things","year":2014,"lang":"en","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scripting language; Representation (politics); Cognitive development; Cognition; Behaviorism; Judgement","score_opus":0.004134348314330158,"score_gpt":0.16654369102097583,"score_spread":0.16240934270664567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100432710","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21740413,0.00003266916,0.012596722,0.00017391297,0.00023890025,0.000040678286,2.146464e-7,0.00065418246,0.7688586],"genre_scores_gemma":[0.9959401,0.0000036953527,0.0012359858,0.0011487504,0.00005434271,0.0000039122333,2.4595494e-7,0.00001916315,0.001593806],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997644,0.000003320776,0.00004184697,0.000062983774,0.000044246714,0.00008319681],"domain_scores_gemma":[0.99985814,0.00002597181,0.0000030858191,0.00008923085,0.0000020448126,0.00002152079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053283296,0.00005528456,0.00004406976,0.00003276114,0.000012707231,0.000020650277,0.00003648376,0.000012739758,0.00016605922],"category_scores_gemma":[0.0000055798673,0.0000458498,0.0000074343106,0.00003062067,0.0000063144844,0.00004001372,0.000014462386,0.000026489643,0.00010960988],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056131953,0.00001609603,0.0024666504,0.00006587346,0.00006254399,0.000001448826,0.00025732815,0.11621526,0.0014362467,0.77218354,0.09803916,0.00925027],"study_design_scores_gemma":[0.0002760877,0.00004515536,0.0065787113,0.00002273575,0.0000080261525,9.910501e-7,0.000026857264,0.34488222,0.004228005,0.0037028014,0.6399849,0.00024347994],"about_ca_topic_score_codex":0.00001385615,"about_ca_topic_score_gemma":0.000009043046,"teacher_disagreement_score":0.77853596,"about_ca_system_score_codex":0.0000072556595,"about_ca_system_score_gemma":2.1317767e-7,"threshold_uncertainty_score":0.18697006},"labels":[],"label_agreement":null},{"id":"W7116685687","doi":"10.1109/tce.2025.3646842","title":"Energy Consumption Forecasting in Net-Zero Energy Buildings: Firefly-Driven LSTM for Smart Consumer Electronics and Edge-Based Energy Optimization","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Consumer Electronics","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Energy consumption; Energy (signal processing); Convergence (economics); Efficient energy use; Renewable energy; Chaotic; Population; Demand response","score_opus":0.012898507041403036,"score_gpt":0.22294263051899849,"score_spread":0.21004412347759546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116685687","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032995192,0.02454104,0.9674139,0.00035175853,0.0025680806,0.0007410717,0.000114533796,0.00047775908,0.0004923301],"genre_scores_gemma":[0.9406286,0.045960028,0.008898973,0.0010512503,0.000106159125,0.0016312543,0.0002178011,0.00037478821,0.0011311856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99287164,0.0003445227,0.0018524324,0.0018164322,0.0005663766,0.0025485873],"domain_scores_gemma":[0.99650747,0.0013061671,0.00041203498,0.0010514581,0.00037236934,0.0003504857],"candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0005578241,0.0014965305,0.0013107134,0.0021549363,0.00085654506,0.0003674854,0.00059642125,0.0010063506,0.00014867088],"category_scores_gemma":[0.000041238418,0.0019562654,0.00048570737,0.0017899782,0.0003600301,0.00053743424,0.000019792225,0.0010392317,0.0000048468473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063743955,0.00045192122,0.00012053853,0.00039997476,0.0011909904,0.000010588192,0.000048324942,0.84303635,0.00094826624,0.011688098,0.0009700831,0.1404974],"study_design_scores_gemma":[0.0051637753,0.00047605005,0.000010929364,0.0005688194,0.0010369124,0.000017792856,0.000019260438,0.8547784,0.031150809,0.00062102417,0.104796775,0.0013594474],"about_ca_topic_score_codex":0.0006561743,"about_ca_topic_score_gemma":0.006788664,"teacher_disagreement_score":0.9585149,"about_ca_system_score_codex":0.0026604517,"about_ca_system_score_gemma":0.0011083022,"threshold_uncertainty_score":0.9997784},"labels":[],"label_agreement":null},{"id":"W7117458052","doi":"10.1109/icprs66293.2025.11302856","title":"Energy Disaggregation Using Radial Basis Function Neural Networks based on Deep Co Training Architecture","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Robustness (evolution); Software deployment; Artificial neural network; Convergence (economics); Key (lock); Function (biology); Energy (signal processing); Efficient energy use; Energy consumption","score_opus":0.012147441566795841,"score_gpt":0.2111239903974648,"score_spread":0.19897654883066895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117458052","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009004633,0.0003443456,0.9578414,0.00046014725,0.0076679704,0.00026164157,0.000003835274,0.00046659572,0.023949448],"genre_scores_gemma":[0.9934284,0.00003388228,0.0021122245,0.001982691,0.0017170322,0.00004805522,0.000119136246,0.0001106526,0.00044790778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969964,0.00022870343,0.0006826681,0.00076148467,0.00044136625,0.0008894007],"domain_scores_gemma":[0.99867195,0.0003295009,0.00012277515,0.00064603466,0.000047857633,0.00018186608],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003065022,0.00068518217,0.00049111183,0.000840179,0.00039844195,0.00026457693,0.0002737153,0.00036270203,0.0005802189],"category_scores_gemma":[0.00004554091,0.0007516684,0.00030789184,0.001246705,0.00007823031,0.00021414315,0.00007004943,0.00053148635,0.0000047799585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020337458,0.000041972115,0.00021710475,0.000055943397,0.00020495735,0.000008211533,0.00007966837,0.74025977,0.00008407997,0.0028245684,0.00042186357,0.25559852],"study_design_scores_gemma":[0.0013889533,0.00014513737,0.0014470059,0.00023013314,0.00033365516,0.0000018611121,0.00012108891,0.987419,0.00032833152,0.00015383803,0.00782776,0.0006032094],"about_ca_topic_score_codex":0.00022068272,"about_ca_topic_score_gemma":0.0003056636,"teacher_disagreement_score":0.98442376,"about_ca_system_score_codex":0.00061766343,"about_ca_system_score_gemma":0.000059498114,"threshold_uncertainty_score":0.9994934},"labels":[],"label_agreement":null},{"id":"W7117469469","doi":"10.1109/icprs66293.2025.11302817","title":"Classification of Electrical Appliances using Deep Convolutional Subspace Clustering","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Cluster analysis; Pattern recognition (psychology); Subspace topology; Process (computing); Rank (graph theory); Correlation clustering; Clustering high-dimensional data; Random subspace method","score_opus":0.021542453429101622,"score_gpt":0.25579781651426603,"score_spread":0.2342553630851644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117469469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038036376,0.0019697184,0.91943467,0.00021965214,0.0013932493,0.00028839335,0.0000020320904,0.00013354,0.03852236],"genre_scores_gemma":[0.9835861,0.00025139365,0.014640856,0.000042566164,0.00016674216,0.00002580337,0.0000073627416,0.000027051987,0.0012521624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99816716,0.00004742567,0.00063928287,0.00038781605,0.0003144012,0.00044392984],"domain_scores_gemma":[0.9992127,0.00011922021,0.00011110797,0.00037649117,0.00011354917,0.000066942244],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002441336,0.00027339274,0.0003489703,0.00038314878,0.00011162794,0.00004777888,0.00028461643,0.00017012257,0.00022140819],"category_scores_gemma":[0.00003844327,0.00032177588,0.000117911906,0.0011543155,0.00010014792,0.0001707066,0.00015130285,0.00020179422,0.000021861233],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031119576,0.00006754641,0.0052087125,0.00035706974,0.00027556953,0.000001197697,0.000041657662,0.8698598,0.018187612,0.10118128,0.0006489333,0.00413951],"study_design_scores_gemma":[0.00040657065,0.000018527184,0.030062502,0.00011643747,0.00012072778,0.0000014605848,0.00015013582,0.9605191,0.0037491196,0.00021338827,0.004396733,0.00024533737],"about_ca_topic_score_codex":0.00010705875,"about_ca_topic_score_gemma":0.00009997516,"teacher_disagreement_score":0.94554967,"about_ca_system_score_codex":0.000575187,"about_ca_system_score_gemma":0.00008951507,"threshold_uncertainty_score":0.9999234},"labels":[],"label_agreement":null},{"id":"W7120472657","doi":"","title":"Evaluation of hour rate effects for rural consumers using generation photovoltaic and/or biomass","year":2020,"lang":"pt","type":"dissertation","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tariff; Photovoltaic system; Renewable energy; Electricity; Feed-in tariff; Consumption (sociology); Distributed generation; Energy consumption; Rural area","score_opus":0.04233337753921492,"score_gpt":0.2755069680616198,"score_spread":0.23317359052240486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7120472657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93173164,0.0028459895,0.04579052,0.001122648,0.008462435,0.0055672023,0.00023771073,0.000518905,0.003722969],"genre_scores_gemma":[0.9912012,0.0003725562,0.0042324904,0.00004548421,0.00060937187,0.0009739042,0.0022979851,0.00018747385,0.000079529455],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946374,0.0008577839,0.0013068215,0.0009668501,0.00147425,0.00075684796],"domain_scores_gemma":[0.9962019,0.00044930732,0.0008784097,0.000538392,0.0014940385,0.00043798846],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018936256,0.00093079044,0.0010210971,0.00083388906,0.00058667926,0.0002568495,0.00042722595,0.0009077354,0.00002634489],"category_scores_gemma":[0.0016073724,0.0009771159,0.00035060887,0.0008811364,0.000024788673,0.00057854835,0.00012890014,0.0005011998,0.000003672821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014480081,0.00056579337,0.00025309718,0.006651493,0.0036677562,0.00008560235,0.0062551736,0.045733962,0.8061435,0.119858675,0.0005995995,0.008737308],"study_design_scores_gemma":[0.0051129693,0.00028999493,0.0029734995,0.0010406466,0.003507965,0.00014489015,0.0014656085,0.8354421,0.072755486,0.00008958462,0.07581272,0.0013644976],"about_ca_topic_score_codex":0.000009166186,"about_ca_topic_score_gemma":0.00034530772,"teacher_disagreement_score":0.7897082,"about_ca_system_score_codex":0.0015163092,"about_ca_system_score_gemma":0.0011245469,"threshold_uncertainty_score":0.99926794},"labels":[],"label_agreement":null},{"id":"W7124270067","doi":"10.65109/dkjg9853","title":"Multiple-Profile Prediction-of-Use Games","year":2017,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Incentive; Electricity; Term (time); Transferable utility; Convexity; Game theory","score_opus":0.026271026014129364,"score_gpt":0.2219204349785035,"score_spread":0.19564940896437413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124270067","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54185635,0.0006302773,0.067038044,0.00041731473,0.021199932,0.0011291568,0.00037300398,0.0010154266,0.3663405],"genre_scores_gemma":[0.97473806,0.00045042057,0.0061955946,0.000020079182,0.00055698893,0.000042930173,0.000016800172,0.000071430535,0.017907716],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99828863,0.0000222093,0.00053862407,0.00037722505,0.00032619838,0.00044710812],"domain_scores_gemma":[0.99739385,0.00012952126,0.0001842007,0.0020530482,0.000092319184,0.00014708292],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001903042,0.00032076397,0.000343946,0.00014646567,0.00031241213,0.00030777213,0.00069046795,0.00015785552,0.0020864124],"category_scores_gemma":[0.00044445563,0.00033752646,0.00016928937,0.00006782935,0.00016873237,0.00090668496,0.00042664065,0.00018080267,0.00030419565],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006155645,0.00026934367,0.47617295,0.00077501714,0.0015053255,0.00003827409,0.0005152403,0.37501028,0.005588868,0.011828244,0.10305755,0.025177335],"study_design_scores_gemma":[0.00083231,0.000053222833,0.44351634,0.0001138905,0.00009016202,0.0000012993823,0.00007568714,0.4763817,0.0116036255,0.000031105767,0.067040265,0.0002603963],"about_ca_topic_score_codex":0.0008153473,"about_ca_topic_score_gemma":0.0000969475,"teacher_disagreement_score":0.43288168,"about_ca_system_score_codex":0.00008359192,"about_ca_system_score_gemma":0.000020431284,"threshold_uncertainty_score":0.9999077},"labels":[],"label_agreement":null},{"id":"W7124289162","doi":"10.65109/miuo2230","title":"Multi-Agent Reinforcement Learning for Fast-Timescale Demand Response of Residential Loads","year":2023,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Demand response; Reinforcement learning; Scale (ratio); Renewable energy; Constant (computer programming); Power (physics); Load management; Response time; Reinforcement","score_opus":0.0191857791473649,"score_gpt":0.25196836025989644,"score_spread":0.23278258111253153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124289162","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15544514,0.0002792017,0.83655417,0.0003717153,0.0030630634,0.001493384,0.000009377508,0.00077361555,0.0020103657],"genre_scores_gemma":[0.89335406,0.00040714198,0.0051440718,0.00003247357,0.00029307467,0.0002291198,0.00005708106,0.00015149031,0.100331485],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961421,0.00021520068,0.001285749,0.0006314756,0.0006640684,0.0010614466],"domain_scores_gemma":[0.9981236,0.00054920884,0.00021315781,0.0007189313,0.00015857772,0.00023652198],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0023710462,0.0005215537,0.00061341166,0.00080125267,0.0002573691,0.00009953082,0.00045351972,0.00022782244,0.0010502525],"category_scores_gemma":[0.00048146624,0.0005897552,0.00041057775,0.0009081838,0.000073788324,0.00023360444,0.00058181264,0.0002690177,0.0005247822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011156562,0.000054567474,0.0004035472,0.0006180259,0.0005518642,0.000023505076,0.0009834442,0.9450026,0.030272793,0.00027414795,0.019998653,0.00070115546],"study_design_scores_gemma":[0.0030714993,0.0004781483,0.009466837,0.00018535664,0.00020538592,0.0000015383488,0.00090328086,0.9056647,0.047066268,0.000011373477,0.032392453,0.0005531611],"about_ca_topic_score_codex":0.00012246035,"about_ca_topic_score_gemma":0.00003683969,"teacher_disagreement_score":0.83141005,"about_ca_system_score_codex":0.0002994485,"about_ca_system_score_gemma":0.00007390972,"threshold_uncertainty_score":0.9998629},"labels":[],"label_agreement":null},{"id":"W7125579747","doi":"10.1109/wsc68292.2025.11338932","title":"Generating Artificial Electricity Data for Monitoring Energy Consumption in Smart Cities","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Systems, Applications & Products in Data Processing (Canada)","funders":"","keywords":"Electricity; Energy consumption; Consumption (sociology); Energy (signal processing); Power consumption; Mains electricity","score_opus":0.05011745206221197,"score_gpt":0.2769710645963577,"score_spread":0.2268536125341457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125579747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17854294,0.002827468,0.8036241,0.00026438513,0.008429373,0.00051378796,0.00005259319,0.00035935047,0.005385991],"genre_scores_gemma":[0.9828927,0.0011894106,0.011442627,0.000117823954,0.0014773423,0.00023744944,0.00019647196,0.00006660376,0.0023795592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970507,0.00008295325,0.00097416225,0.00081314414,0.00024559844,0.0008334393],"domain_scores_gemma":[0.99831426,0.0003595419,0.00008004576,0.0011132872,0.00006316299,0.00006971364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007551411,0.00042384648,0.00045625184,0.0007043529,0.00024408157,0.00029556002,0.00069481705,0.00021830124,0.00009843028],"category_scores_gemma":[0.00020714541,0.0005313038,0.000081645616,0.000697022,0.00004411703,0.00047717075,0.0005593495,0.00024147722,0.000009346833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000731876,0.00011203234,0.017797329,0.00061879,0.0003531542,0.0000077660725,0.00008374823,0.8350474,0.009014115,0.058368493,0.006772977,0.07175101],"study_design_scores_gemma":[0.00053763343,0.00002468092,0.0029922153,0.00020894395,0.000100212616,5.3407103e-7,0.00016022711,0.94862133,0.03160904,0.00058291777,0.014704974,0.00045727502],"about_ca_topic_score_codex":0.00096073054,"about_ca_topic_score_gemma":0.0015125219,"teacher_disagreement_score":0.8043498,"about_ca_system_score_codex":0.00053192844,"about_ca_system_score_gemma":0.00008113302,"threshold_uncertainty_score":0.99971384},"labels":[],"label_agreement":null},{"id":"W7128035640","doi":"10.22260/crc-csce-2025/0012","title":"Business Model Evaluation of Renewable Energy Community in Multi Unit Residential Building in Canada net metering, considering the regulatory framework, ownership and organizational structure","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Unit (ring theory); Renewable energy; Business model; Organizational structure; Mode (computer interface); Net (polyhedron)","score_opus":0.03623344720947026,"score_gpt":0.2493100848305004,"score_spread":0.21307663762103013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128035640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8850045,0.0007554857,0.11259164,0.00022817703,0.0006579629,0.0002758605,0.000013170017,0.000025805255,0.00044739686],"genre_scores_gemma":[0.99278295,0.000098201286,0.0067267185,0.00014615679,0.000032360025,0.000020019204,0.00002542277,0.000045800334,0.00012235752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99700177,0.00073229667,0.0008538313,0.00032460573,0.00067537156,0.000412133],"domain_scores_gemma":[0.9981472,0.00050319254,0.00015523953,0.000740787,0.00039532452,0.000058274916],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015186443,0.0003558851,0.00043053032,0.00053518324,0.0001970609,0.00008604115,0.0004526535,0.00021560388,0.00014885148],"category_scores_gemma":[0.0007701086,0.00034870653,0.000023455917,0.0018289811,0.00010423484,0.00024450177,0.000591386,0.0005901941,4.5246164e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019706811,0.000020475243,0.022716867,0.00025897793,0.000121884026,0.0000024924327,0.00042338634,0.96623546,0.0019464508,0.0077860104,0.0001735625,0.00029475335],"study_design_scores_gemma":[0.0009062625,0.000003366785,0.11440279,0.0005318293,0.00010934911,0.000001572768,0.0012153874,0.87053674,0.0049009076,0.0070958408,0.000035183024,0.00026074352],"about_ca_topic_score_codex":0.9369145,"about_ca_topic_score_gemma":0.9913311,"teacher_disagreement_score":0.10777846,"about_ca_system_score_codex":0.0014964542,"about_ca_system_score_gemma":0.0019178932,"threshold_uncertainty_score":0.99989647},"labels":[],"label_agreement":null},{"id":"W7139952824","doi":"10.1109/isgtasia63446.2025.11431487","title":"Adaptive ADMM for Distributed Peer-To-Peer Energy Trading","year":2025,"lang":"","type":"article","venue":"","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy (signal processing); Energy consumption; Feature (linguistics); Context (archaeology); Production (economics)","score_opus":0.015156885028462984,"score_gpt":0.23669056024898044,"score_spread":0.22153367522051745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7139952824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00051215646,0.00026828577,0.8973165,0.007625576,0.005048741,0.0005944743,0.00031502906,0.0005202761,0.08779892],"genre_scores_gemma":[0.8657706,0.000028608401,0.012841896,0.0009449533,0.0005986894,0.0005448819,0.00028867685,0.0001111627,0.11887055],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99664116,0.000042948126,0.00074940315,0.00082695414,0.0006149431,0.0011245997],"domain_scores_gemma":[0.9980585,0.00033774337,0.000057089917,0.0007358101,0.00048686092,0.00032396906],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004971592,0.0006535729,0.00062143645,0.00054552034,0.00024402833,0.00021457429,0.0006140985,0.00025571827,0.000600476],"category_scores_gemma":[0.00032894363,0.0007397625,0.00034376656,0.0013240773,0.000041443793,0.00021809418,0.0002958119,0.00021066795,0.000050990093],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000911532,0.00007090547,0.000028539544,0.000101553625,0.0007854677,0.00000725331,0.00012264229,0.3270698,0.00021476431,0.22390068,0.43672785,0.010879423],"study_design_scores_gemma":[0.00081120804,0.0001086855,0.00026520956,0.000105964515,0.00018482184,5.6657626e-7,0.00035874153,0.45368907,0.0061271144,0.000957455,0.5369175,0.0004736833],"about_ca_topic_score_codex":0.00023492542,"about_ca_topic_score_gemma":0.00024818178,"teacher_disagreement_score":0.88447464,"about_ca_system_score_codex":0.00084424455,"about_ca_system_score_gemma":0.00008472005,"threshold_uncertainty_score":0.99950534},"labels":[],"label_agreement":null},{"id":"W7143405636","doi":"10.71465/ajiot2982","title":"The Impact of Iot On Smart Energy Solutions: Reducing Consumption and Emissions","year":2023,"lang":"","type":"article","venue":"American Journal Of Internet Of Things","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Enabling; Internet of Things; Energy consumption; Renewable energy; Key (lock); Sustainability; Efficient energy use; Consumption (sociology); Automation; Smart grid","score_opus":0.016134352340681505,"score_gpt":0.26268567932833475,"score_spread":0.24655132698765325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7143405636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925767,0.001569324,0.0034722425,0.00058674446,0.0010982577,0.00006419005,0.0000054381644,0.00003382319,0.00059328444],"genre_scores_gemma":[0.9919318,0.0070103765,0.00047921386,0.00003533822,0.00012926907,0.0000025759073,0.0000014655022,0.000043817618,0.00036616728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975913,0.0001657921,0.001191953,0.00018092223,0.0004502759,0.00041976143],"domain_scores_gemma":[0.99722433,0.0006993838,0.0013427646,0.00033261656,0.00020619569,0.00019472277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011876251,0.00027776192,0.0006129987,0.0005738483,0.000105874235,0.000057855905,0.00047794016,0.000056592882,0.000056327397],"category_scores_gemma":[0.0004063315,0.00020238046,0.00039866738,0.000544726,0.0005690679,0.00017615414,0.00023317807,0.00041838863,0.0000053524077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087049796,0.00027634096,0.0056265485,0.00020903847,0.0044642203,0.000055704862,0.008095676,0.68839425,0.020455725,0.003206388,0.03689161,0.231454],"study_design_scores_gemma":[0.002232502,0.011614763,0.083728924,0.009783987,0.00071351504,0.00044248384,0.0074630533,0.854625,0.019785563,0.0010851386,0.0074926005,0.0010325029],"about_ca_topic_score_codex":0.002684896,"about_ca_topic_score_gemma":0.000005613955,"teacher_disagreement_score":0.2304215,"about_ca_system_score_codex":0.0002759238,"about_ca_system_score_gemma":0.00007973913,"threshold_uncertainty_score":0.8252836},"labels":[],"label_agreement":null},{"id":"W7148216823","doi":"","title":"Business Model Evaluation of Renewable Energy Community in Multi Unit Residential Building in Canada Net Metering, Considering the Regulatory Framework, Ownership and Organizational Structure","year":2025,"lang":"","type":"article","venue":"Lincoln (University of Nebraska)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Renewable energy; Business model; Corporate governance; Distribution (mathematics); Electricity; Unit (ring theory); Net metering; Electric power distribution","score_opus":0.02824399563752053,"score_gpt":0.218415837691085,"score_spread":0.19017184205356447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7148216823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9435181,0.0005148258,0.05474838,0.00031286912,0.00037192687,0.00025278595,0.000034947036,0.000015983554,0.00023017792],"genre_scores_gemma":[0.99232006,0.00011735717,0.0073092277,0.00004426326,0.000020105574,9.612426e-7,0.000026203985,0.00002417751,0.00013766852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978248,0.00057554,0.00042245394,0.00029404735,0.00058255816,0.00030063125],"domain_scores_gemma":[0.9983387,0.00040203644,0.0002325988,0.0005688159,0.00039768295,0.000060169823],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009299735,0.00025826425,0.00044378146,0.0006343423,0.00025805816,0.000027962355,0.0005670374,0.00022767081,0.000094404066],"category_scores_gemma":[0.00029662758,0.00032774737,0.00003597279,0.0018145839,0.0001810803,0.00028664124,0.0007093345,0.0004987122,5.8152846e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049166756,0.000034223758,0.02565302,0.0003248637,0.00014325383,0.000007182452,0.0011794646,0.9678006,0.0014123194,0.0027663026,0.00013941944,0.0004901423],"study_design_scores_gemma":[0.0011991365,0.0000065357926,0.22799727,0.00057646475,0.00014689402,0.0000010447128,0.0044218525,0.7615138,0.0005918638,0.0032841968,0.00006407769,0.00019682045],"about_ca_topic_score_codex":0.87676203,"about_ca_topic_score_gemma":0.9819872,"teacher_disagreement_score":0.2062868,"about_ca_system_score_codex":0.0011908632,"about_ca_system_score_gemma":0.0018442388,"threshold_uncertainty_score":0.99991745},"labels":[],"label_agreement":null},{"id":"W7148314507","doi":"10.1007/978-3-032-07031-9_14","title":"Electricity Price Dynamics in the Smart Grid","year":2025,"lang":"en","type":"book-chapter","venue":"Static & dynamic game theory: foundations & applications","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Innovation and Economic Development Trois Rivières","funders":"","keywords":"Electricity; Electricity market; Smart grid; Mains electricity; Supply and demand; Process (computing); System dynamics; Noise (video)","score_opus":0.0061879351751723995,"score_gpt":0.22705014276611507,"score_spread":0.22086220759094266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7148314507","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000030429723,0.00017074394,0.47784418,0.0005424066,0.00027619832,0.0016320328,0.00034584157,0.00036433086,0.5187938],"genre_scores_gemma":[0.16228718,0.003646266,0.011892232,0.0017502723,0.0006436431,0.015112186,0.02009453,0.0008041374,0.78376955],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976124,0.00009581532,0.00079315755,0.0005703898,0.00042242647,0.0005057898],"domain_scores_gemma":[0.99707645,0.0009394824,0.00019480714,0.0015915823,0.00012700795,0.00007066228],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00075726816,0.00058390154,0.00047465708,0.00074136764,0.00024813783,0.00016409736,0.0011098813,0.00023395401,0.00027139168],"category_scores_gemma":[0.000056095363,0.000572072,0.00017541151,0.0006776736,0.00021627532,0.00012812037,0.0001246303,0.0008497944,0.00035548845],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045368242,0.000047648336,0.0000041913977,0.00011492782,0.00023050087,0.0000022174015,0.00015245301,0.016563458,0.0000020281789,0.967561,0.0022710601,0.013045964],"study_design_scores_gemma":[0.0002270333,0.000019228262,0.00020239523,0.00007707901,0.0003253597,0.000006156112,0.0001608171,0.21956313,5.981322e-7,0.42362094,0.3552666,0.00053067284],"about_ca_topic_score_codex":0.000049348626,"about_ca_topic_score_gemma":0.001423548,"teacher_disagreement_score":0.54394007,"about_ca_system_score_codex":0.0018577907,"about_ca_system_score_gemma":0.00018196322,"threshold_uncertainty_score":0.99967307},"labels":[],"label_agreement":null},{"id":"W7154204599","doi":"10.5281/zenodo.19566272","title":"Flexibility In Future Power Systems","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Electric power system; Electricity; Power grid; Power (physics); Grid","score_opus":0.014364370048850295,"score_gpt":0.20116089897549647,"score_spread":0.18679652892664617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154204599","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42061958,0.00028783127,0.0024561104,0.0002307708,0.0014857355,0.0007240381,0.000049587095,0.0023933514,0.57175297],"genre_scores_gemma":[0.9979554,0.000039401493,0.000043143922,0.000028974686,0.00010177787,3.8393242e-8,0.00020302877,0.00087732787,0.0007509223],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892783,0.00010875594,0.0001908019,0.00025586563,0.00023105288,0.00028571792],"domain_scores_gemma":[0.99932003,0.0000064842293,0.000021620048,0.0004799417,0.0000947353,0.00007720014],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00044280413,0.000112615,0.000121364006,0.00018590668,0.0001885528,0.0002801901,0.0005181584,0.000054296164,0.006686051],"category_scores_gemma":[0.00004289667,0.00012231886,0.000027582573,0.0004288518,0.000024705956,0.00018162062,0.00037907975,0.0001985727,0.011705925],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079153695,0.00021493767,0.00020551984,0.0006883401,0.00014321586,0.00004577003,0.0022215557,0.5226596,0.0059020035,0.033288132,0.40832776,0.026223995],"study_design_scores_gemma":[0.00030098204,0.00004767873,0.0044947476,0.000021037684,0.0000023956472,0.0000116027095,0.00036240518,0.013252109,0.0000766871,0.000022744704,0.98126465,0.00014294467],"about_ca_topic_score_codex":0.000012594053,"about_ca_topic_score_gemma":3.3209304e-7,"teacher_disagreement_score":0.5773358,"about_ca_system_score_codex":0.0002270822,"about_ca_system_score_gemma":7.7009895e-7,"threshold_uncertainty_score":0.994222},"labels":[],"label_agreement":null},{"id":"W7154207008","doi":"10.5281/zenodo.19566273","title":"Flexibility In Future Power Systems","year":2019,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Electric power system; Electricity; Power grid; Power (physics); Grid","score_opus":0.014364370048850295,"score_gpt":0.20116089897549647,"score_spread":0.18679652892664617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154207008","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42061958,0.00028783127,0.0024561104,0.0002307708,0.0014857355,0.0007240381,0.000049587095,0.0023933514,0.57175297],"genre_scores_gemma":[0.9979554,0.000039401493,0.000043143922,0.000028974686,0.00010177787,3.8393242e-8,0.00020302877,0.00087732787,0.0007509223],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892783,0.00010875594,0.0001908019,0.00025586563,0.00023105288,0.00028571792],"domain_scores_gemma":[0.99932003,0.0000064842293,0.000021620048,0.0004799417,0.0000947353,0.00007720014],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00044280413,0.000112615,0.000121364006,0.00018590668,0.0001885528,0.0002801901,0.0005181584,0.000054296164,0.006686051],"category_scores_gemma":[0.00004289667,0.00012231886,0.000027582573,0.0004288518,0.000024705956,0.00018162062,0.00037907975,0.0001985727,0.011705925],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079153695,0.00021493767,0.00020551984,0.0006883401,0.00014321586,0.00004577003,0.0022215557,0.5226596,0.0059020035,0.033288132,0.40832776,0.026223995],"study_design_scores_gemma":[0.00030098204,0.00004767873,0.0044947476,0.000021037684,0.0000023956472,0.0000116027095,0.00036240518,0.013252109,0.0000766871,0.000022744704,0.98126465,0.00014294467],"about_ca_topic_score_codex":0.000012594053,"about_ca_topic_score_gemma":3.3209304e-7,"teacher_disagreement_score":0.5773358,"about_ca_system_score_codex":0.0002270822,"about_ca_system_score_gemma":7.7009895e-7,"threshold_uncertainty_score":0.994222},"labels":[],"label_agreement":null},{"id":"W7165448998","doi":"10.5281/zenodo.20773504","title":"Significance of Smart meters in Modern Energy Management Systems","year":2020,"lang":"en","type":"article","venue":"Open MIND","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Smart grid; Renewable energy; Software deployment; Energy management; Big data; Net metering; Default gateway; Demand response; Electricity; Distributed generation","score_opus":0.029912361636229276,"score_gpt":0.22208618085707027,"score_spread":0.19217381922084098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7165448998","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3845748,0.0010253498,0.11833294,0.00045697155,0.0015737943,0.0015887849,0.000033691347,0.000049772098,0.4923639],"genre_scores_gemma":[0.99690205,0.00004100859,0.0023322518,0.00003380545,0.000029257553,0.000071858405,0.0000055430646,0.000022945454,0.00056128565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920857,0.000022673843,0.0002547816,0.00020617561,0.00013975264,0.00016804751],"domain_scores_gemma":[0.9996741,0.000013281116,0.000030214433,0.00021674042,0.000007889999,0.00005778828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001069001,0.000113433845,0.00020084441,0.00006596369,0.00000883761,0.000044869787,0.0004193339,0.000027046633,0.00009629054],"category_scores_gemma":[0.0000026347166,0.00012380992,0.000025400625,0.00022086954,0.000011973875,0.00011388246,0.00017428126,0.0000425513,0.000036208665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015969932,0.000015370777,0.00016207101,0.000085872285,0.00009556444,0.00003527501,0.00028593277,0.9619854,0.001138656,0.00039829884,0.0012389701,0.034542583],"study_design_scores_gemma":[0.00068342383,0.00005045919,0.00051355927,0.000087067354,0.000033961092,5.636562e-7,0.0005265161,0.8079425,0.011073823,0.000023638457,0.17876956,0.00029493927],"about_ca_topic_score_codex":0.00013310826,"about_ca_topic_score_gemma":0.00006761531,"teacher_disagreement_score":0.6123272,"about_ca_system_score_codex":0.000052691274,"about_ca_system_score_gemma":0.0000045661445,"threshold_uncertainty_score":0.5048822},"labels":[],"label_agreement":null},{"id":"W7165467434","doi":"10.5281/zenodo.20773505","title":"Significance of Smart meters in Modern Energy Management Systems","year":2020,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Smart grid; Renewable energy; Software deployment; Energy management; Big data; Net metering; Default gateway; Demand response; Electricity; Distributed generation","score_opus":0.025991780330341795,"score_gpt":0.19256352415412495,"score_spread":0.16657174382378315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7165467434","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052454557,0.00081491604,0.40169886,0.0008265452,0.0007282999,0.0012695031,0.0001555874,0.0037531862,0.53829855],"genre_scores_gemma":[0.99850065,0.00015135125,0.00019811446,0.00006341858,0.000052615625,1.6398705e-7,0.00012360065,0.00073601276,0.00017409297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988768,0.00010392572,0.00026173433,0.00024644381,0.00026547196,0.00024561377],"domain_scores_gemma":[0.99950963,0.000007248177,0.000039144343,0.00027057208,0.00006964782,0.00010373503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020565306,0.000117345546,0.00015057114,0.00018593256,0.0001349294,0.00012879357,0.0005900943,0.000030057874,0.00048066748],"category_scores_gemma":[0.000031333613,0.00013800595,0.000031142306,0.00053250854,0.000039883314,0.00012037455,0.0004307516,0.00009579169,0.0003399768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006212883,0.000070479684,0.000008488412,0.00071793643,0.0001924519,0.000051973566,0.001139402,0.81523126,0.0065684337,0.015957324,0.08327582,0.07672432],"study_design_scores_gemma":[0.00041804276,0.00008884645,0.00028772044,0.000039531187,0.000013100749,0.000003672147,0.00033514135,0.2121464,0.0010584483,0.000040774205,0.785389,0.00017931806],"about_ca_topic_score_codex":0.000027773362,"about_ca_topic_score_gemma":4.267038e-7,"teacher_disagreement_score":0.94604605,"about_ca_system_score_codex":0.00011689176,"about_ca_system_score_gemma":5.8133696e-7,"threshold_uncertainty_score":0.562772},"labels":[],"label_agreement":null},{"id":"W774520142","doi":"10.1016/j.scs.2015.06.004","title":"Quasi real-time ZIP load modeling for Conservation Voltage Reduction of smart distribution networks using disaggregated AMI data","year":2015,"lang":"en","type":"article","venue":"Sustainable Cities and Society","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology; Simon Fraser University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Voltage reduction; Metering mode; Smart grid; Real-time computing; Energy conservation; Computer science; Energy (signal processing); Energy consumption; Reliability engineering; Reduction (mathematics); Voltage; Engineering; Automotive engineering; Simulation; Electrical engineering; Statistics; Mathematics","score_opus":0.030319901198172565,"score_gpt":0.23790116298307176,"score_spread":0.2075812617848992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W774520142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42837015,0.0003882132,0.5703448,0.000048255795,0.00021422483,0.00028373543,0.000056217785,0.00014379977,0.00015058239],"genre_scores_gemma":[0.9955479,0.0005512867,0.001579679,0.000012791289,0.00022448676,0.000024119752,0.0012201171,0.000034530833,0.0008051218],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908483,0.000016612048,0.00024322885,0.00019647669,0.00014851888,0.0003103247],"domain_scores_gemma":[0.99924165,0.000026518663,0.000058867117,0.00028688356,0.00032771003,0.00005836098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061433716,0.00013368524,0.00018411687,0.000016801465,0.00015179781,0.000059633956,0.00010563362,0.00010015418,0.0000019995846],"category_scores_gemma":[0.00005327668,0.00014815442,0.000048860766,0.00017329612,0.00006800512,0.0004633606,0.0001237552,0.00006799892,1.2087604e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028070532,0.000016876627,0.000091344424,0.00038900136,0.00008553045,6.1360805e-7,0.0008132992,0.97747946,0.00011603204,0.0027101396,0.01804786,0.00022175207],"study_design_scores_gemma":[0.00041781223,0.000041558116,0.00002647587,0.000036031874,0.000060600472,0.0000012931386,0.020501096,0.9750718,0.00005461503,0.00073248846,0.0029059295,0.00015028994],"about_ca_topic_score_codex":0.0014958393,"about_ca_topic_score_gemma":0.000008320296,"teacher_disagreement_score":0.5687651,"about_ca_system_score_codex":0.0004756067,"about_ca_system_score_gemma":0.000073538096,"threshold_uncertainty_score":0.6041562},"labels":[],"label_agreement":null}]}