{"meta":{"query_hash":"01b0f75884a5","filters":{"topic":"Urban Transport Systems Analysis"},"cohort_total":247,"direct_labels_cover":0,"predictions_cover":247,"exported":247,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/01b0f75884a5","api":"https://metacan.xera.ac/api/v1/cohort?topic=Urban+Transport+Systems+Analysis"},"results":[{"id":"W1482678990","doi":"","title":"Pengaruh Kualitas Pelayanan dan Harga Terhadap Kepuasan PelangganPengguna Jasa Kereta Api Menoreh Kelas Ekonomi Studi Kasus Pada PT. Kereta Api Indonesia DAOP IV Semarang","year":2015,"lang":"id","type":"article","venue":"Jurnal Ilmu Administrasi Bisnis S1 Undip","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Accidental sampling; Nonprobability sampling; Service quality; Quality (philosophy); Service (business); Customer satisfaction; Business; Marketing; Test (biology); Advertising; Operations management; Engineering; Population; Geography","score_opus":0.0379789530918819,"score_gpt":0.25780846453182527,"score_spread":0.21982951143994336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1482678990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.801928,0.009044306,0.0030400327,0.0031410984,0.00040636913,0.00018614023,0.00052039436,0.00019368151,0.18154001],"genre_scores_gemma":[0.9122921,0.008509719,0.003167747,0.00029175362,0.00007304644,0.00011430097,0.0002623979,0.00004945153,0.07523948],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998436,0.0000359476,0.000010601799,0.000029025929,0.000043220265,0.000037483936],"domain_scores_gemma":[0.9998492,0.000043949596,0.000019750158,0.000011430264,0.00004219986,0.00003339532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031992717,0.00034032096,0.00024545466,0.0004423574,0.0012432489,0.0023089435,0.00026143945,0.00032997245,0.017859658],"category_scores_gemma":[0.00040825925,0.00022339229,0.0002016528,0.0007005442,0.00039464858,0.0013689486,0.0007823652,0.00073986227,0.0027391866],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006545712,0.0016419018,0.095484875,0.0022187182,0.00012655844,0.0037965798,0.032282826,0.0011855003,0.026110718,0.02551514,0.03187311,0.7791095],"study_design_scores_gemma":[0.000060286875,0.0010932969,0.29210648,0.001162921,0.0002173757,0.00429762,0.07194519,0.0018664511,0.014258215,0.0058571864,0.6069955,0.00013953725],"about_ca_topic_score_codex":0.0026710692,"about_ca_topic_score_gemma":0.006198507,"teacher_disagreement_score":0.017859658,"about_ca_system_score_codex":0.00055679533,"about_ca_system_score_gemma":0.0011642794,"threshold_uncertainty_score":0.059746563},"labels":[],"label_agreement":null},{"id":"W1561456084","doi":"10.9744/dimensi.33.1","title":"USULAN STANDAR DAN EVALUASI TINGKAT PELAYANAN WALKWAY DI UNIVERSITAS KRISTEN PETRA","year":2005,"lang":"en","type":"article","venue":"Jurnal Akuntansi dan Keuangan (Institute of Research and Community Outreach Petra Christian University)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transport engineering; Geography; Mathematics; Engineering","score_opus":0.03325400463360716,"score_gpt":0.25543863460910976,"score_spread":0.2221846299755026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1561456084","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9534729,0.0012789556,0.005006402,0.00057493756,0.000085910026,0.00017093707,0.0024092556,0.0003424039,0.036658224],"genre_scores_gemma":[0.9623865,0.0011730439,0.008638655,0.00006179111,0.000018164978,0.00020897483,0.0022753095,0.00006959417,0.025168018],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99843186,0.00036557598,0.00010418209,0.00021216227,0.0006586759,0.00022752551],"domain_scores_gemma":[0.9978848,0.0003735414,0.00020782436,0.00011491268,0.0010560754,0.00036274394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012942096,0.0006454253,0.00036530974,0.0013599603,0.00089134165,0.0018079128,0.00047025408,0.00035707804,0.017905552],"category_scores_gemma":[0.0029262046,0.00021408546,0.0003222343,0.0015683994,0.00033457828,0.000977968,0.0010973759,0.0004777206,0.0048959716],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011380253,0.00084084395,0.4223971,0.0010763485,0.00009753258,0.0007919673,0.006089015,0.0038493099,0.011468714,0.0022029977,0.016861279,0.5331868],"study_design_scores_gemma":[0.000043415304,0.0027287689,0.8199165,0.0006782481,0.00015554634,0.001071616,0.02989978,0.003985738,0.01653387,0.0013038027,0.12347618,0.00020665501],"about_ca_topic_score_codex":0.0098804245,"about_ca_topic_score_gemma":0.01904897,"teacher_disagreement_score":0.017905552,"about_ca_system_score_codex":0.0013439646,"about_ca_system_score_gemma":0.0018204127,"threshold_uncertainty_score":0.059900105},"labels":[],"label_agreement":null},{"id":"W1604492156","doi":"10.12962/j23373539.v4i1.8973","title":"Penentuan Rute Angkutan Umum berdasarkan Kebutuhan Perjalanan Penduduk di Kawasan Perkotaan Gresik","year":2015,"lang":"id","type":"article","venue":"Jurnal Teknik ITS","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.033171786750054874,"score_gpt":0.23475885215439754,"score_spread":0.20158706540434268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1604492156","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15711924,0.0041179033,0.1046864,0.0123958,0.0011029359,0.0006056552,0.0017261715,0.0020398167,0.7162061],"genre_scores_gemma":[0.5528804,0.003949351,0.08676521,0.0019108946,0.00017528457,0.0003368307,0.0013140779,0.0005474899,0.35212046],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989347,0.00026767442,0.000057841135,0.00018483691,0.00039147685,0.00016353639],"domain_scores_gemma":[0.9984282,0.0003920942,0.000184477,0.00019873428,0.00060686615,0.0001896039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014907811,0.00046527715,0.00033118832,0.000851005,0.0021826292,0.0047751977,0.0009567377,0.0008213526,0.03317354],"category_scores_gemma":[0.0020869193,0.0003363135,0.00050096074,0.0012899835,0.0015114242,0.0027903628,0.002098751,0.0012123343,0.007753163],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054040237,0.00046010417,0.023157442,0.0026034852,0.00010512788,0.0029957532,0.03270089,0.0025006474,0.03506573,0.1844757,0.065520376,0.6498744],"study_design_scores_gemma":[0.000023591268,0.00025974898,0.037399236,0.00064510165,0.000088952744,0.0008152676,0.028412405,0.0027742144,0.019756729,0.026944892,0.8827719,0.0001080345],"about_ca_topic_score_codex":0.008467842,"about_ca_topic_score_gemma":0.023331873,"teacher_disagreement_score":0.03317354,"about_ca_system_score_codex":0.0022242344,"about_ca_system_score_gemma":0.004055008,"threshold_uncertainty_score":0.11097652},"labels":[],"label_agreement":null},{"id":"W1604569860","doi":"10.21776/ub.ruas.2013.011.02.10","title":"Peran Lansekap Dalam Kinerja Infrastruktur Perkotaan Studi Kasus: Surabaya dan Malang, Indonesia","year":2013,"lang":"id","type":"article","venue":"Review of Urbanism and Architectural Studies","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Green infrastructure; Environmental planning; Noise pollution; Business; Wildlife; Urban planning; Transport engineering; Environmental resource management; Environmental science; Civil engineering; Geography; Computer science; Engineering","score_opus":0.012354599292794272,"score_gpt":0.23246118648032554,"score_spread":0.22010658718753126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1604569860","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7493879,0.1602439,0.0010088958,0.0029951322,0.00022912576,0.00009880284,0.0006637302,0.000053858315,0.08531858],"genre_scores_gemma":[0.9312831,0.05580949,0.0005701003,0.00015670809,0.000028681088,0.000038323942,0.0002210267,0.000006845883,0.011885742],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9999039,0.000017495142,0.000008240532,0.000022135766,0.000025241196,0.000022965281],"domain_scores_gemma":[0.9998995,0.000028186569,0.000031435873,0.0000037866555,0.000016747837,0.000020191961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020558377,0.00029531363,0.0001633117,0.000585538,0.0008976352,0.0017582163,0.00026684778,0.00023432967,0.0035969932],"category_scores_gemma":[0.00020109599,0.00016294167,0.00010878732,0.0012215618,0.00048944895,0.0009267914,0.00064137543,0.00038388986,0.00041279494],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022030949,0.0005868474,0.30298704,0.007906696,0.00013751253,0.010456167,0.058896363,0.0017531945,0.0074793375,0.040874884,0.019473119,0.5492286],"study_design_scores_gemma":[0.00001201706,0.00017648788,0.5750959,0.0026003988,0.00012714189,0.0041366816,0.07508618,0.00078895985,0.0025728217,0.0023425028,0.3370231,0.00003782535],"about_ca_topic_score_codex":0.014702453,"about_ca_topic_score_gemma":0.03810931,"teacher_disagreement_score":0.014702453,"about_ca_system_score_codex":0.0015679902,"about_ca_system_score_gemma":0.001822077,"threshold_uncertainty_score":0.029233694},"labels":[],"label_agreement":null},{"id":"W1924240907","doi":"","title":"Analisis Persepsi Pelaku Perjalanan dalam Pemilihan Moda Transportasi Umum dengan Metode Analytical Hierarchy Process (Ahp) (Wilayah DKI Jakarta)","year":2015,"lang":"id","type":"article","venue":"Jurnal Ilmiah Universitas Bakrie","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Hierarchy; Process (computing); Engineering; Political science; Computer science; Operations research; Law","score_opus":0.025555724015630294,"score_gpt":0.23979567782020475,"score_spread":0.21423995380457445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1924240907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62487876,0.008461827,0.26448208,0.005916413,0.0006287603,0.0019528614,0.006509175,0.0010099381,0.086160116],"genre_scores_gemma":[0.87063885,0.0036164108,0.09275744,0.0005907269,0.00008113705,0.000734406,0.001992208,0.00017905742,0.029409796],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99497426,0.0013738795,0.00039405277,0.00051615573,0.0023925742,0.0003490771],"domain_scores_gemma":[0.98987633,0.004659221,0.0009932773,0.0003795933,0.0038581307,0.00023348737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057928357,0.00087560824,0.00073846936,0.0029572418,0.001269714,0.0037070205,0.0007953945,0.0008611439,0.009580691],"category_scores_gemma":[0.010835362,0.0004070183,0.0013200741,0.0037592389,0.000801107,0.0022031497,0.0013850519,0.0016052449,0.0016720345],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011760757,0.000814796,0.19343038,0.005148869,0.00089338276,0.0012875353,0.023946574,0.019115534,0.025807176,0.021689687,0.01648097,0.690209],"study_design_scores_gemma":[0.00013959032,0.0023227578,0.44308934,0.0034448477,0.0017089049,0.0017896503,0.10075428,0.11202523,0.06614798,0.042000897,0.22596109,0.00061552325],"about_ca_topic_score_codex":0.015540569,"about_ca_topic_score_gemma":0.023840576,"teacher_disagreement_score":0.015540569,"about_ca_system_score_codex":0.0024556653,"about_ca_system_score_gemma":0.004646411,"threshold_uncertainty_score":0.03205067},"labels":[],"label_agreement":null},{"id":"W1987902381","doi":"10.1201/1079/43271.29.2.20010801/30416.1","title":"Integrating the Planning and Control of Auditing at the Toronto Transit Commission: (Conclusion)","year":2001,"lang":"en","type":"article","venue":"EDPACS","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Audit; Commission; Control (management); Function (biology); Business; Internal audit; Transit (satellite); Audit plan; Accounting; Engineering; Transport engineering; Joint audit; Management; Public transport; Finance; Economics","score_opus":0.008096804316679975,"score_gpt":0.20690873792694373,"score_spread":0.19881193361026375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987902381","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23828438,0.010991597,0.11369961,0.08204739,0.0020588553,0.001495867,0.002821074,0.0012622196,0.547339],"genre_scores_gemma":[0.9071638,0.0017165488,0.018228386,0.0010954536,0.0002453592,0.000080507176,0.0004746068,0.000079303936,0.07091598],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99335784,0.0019131216,0.00024601034,0.0003788595,0.002994183,0.001110057],"domain_scores_gemma":[0.98866874,0.0012579445,0.0009287119,0.0007334332,0.00690088,0.0015102881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056513944,0.00031508855,0.00015689677,0.0016888364,0.0027741878,0.010500268,0.000819782,0.0008485573,0.0074351574],"category_scores_gemma":[0.010363817,0.0003124156,0.00018406482,0.002375746,0.0036971904,0.0016954875,0.0022164981,0.0012547199,0.00043768244],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021850273,0.000064693806,0.042565446,0.0005669619,0.000049852148,0.00058930984,0.010106553,0.032830905,0.0017543028,0.48217097,0.12136454,0.30771798],"study_design_scores_gemma":[0.00004888047,0.000115372,0.09568876,0.0008657056,0.000062730316,0.00021901942,0.0114116585,0.021032259,0.005585667,0.04007891,0.8247272,0.00016386912],"about_ca_topic_score_codex":0.7852289,"about_ca_topic_score_gemma":0.82597244,"teacher_disagreement_score":0.7852289,"about_ca_system_score_codex":0.050383333,"about_ca_system_score_gemma":0.08535007,"threshold_uncertainty_score":0.4320718},"labels":[],"label_agreement":null},{"id":"W1997014035","doi":"10.1109/iccms.2010.382","title":"Model of Assessment of the Emergency Danger on the Railways","year":2010,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Warning system; Index (typography); Scale (ratio); Computer science; Environmental science; Transport engineering; Statistics; Engineering; Mathematics; Geography","score_opus":0.01850472640094299,"score_gpt":0.2203596070649528,"score_spread":0.2018548806640098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997014035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1611788,0.0008840624,0.7580731,0.0013983797,0.00019733247,0.00025590745,0.0018276771,0.0012513478,0.07493328],"genre_scores_gemma":[0.9548658,0.0006248933,0.012166024,0.000060067574,0.000053448806,0.00029440387,0.00054866145,0.00006114078,0.03132549],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956924,0.00012214352,0.000018399945,0.00010416558,0.00011635502,0.00006976613],"domain_scores_gemma":[0.9995222,0.00013098508,0.00007980672,0.000014888481,0.00021356491,0.00003856361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005552179,0.0008293438,0.00076811906,0.0010244932,0.00047145472,0.0016049378,0.0015647613,0.0014346158,0.011819801],"category_scores_gemma":[0.0016146254,0.0003405493,0.0008197106,0.0006727701,0.00063393544,0.0011010551,0.0008132469,0.00081149075,0.0014611253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039854578,0.00002466414,0.001544401,0.000054798486,0.00002890256,0.00013782566,0.00009355459,0.97830963,0.00073834945,0.013593659,0.0007900338,0.004644296],"study_design_scores_gemma":[0.000009692601,0.000032408872,0.0008034476,0.000011139011,0.000014388882,0.000045677036,0.00003070328,0.9942913,0.00010350198,0.0039376463,0.0007100527,0.000010048871],"about_ca_topic_score_codex":0.017633839,"about_ca_topic_score_gemma":0.0076386593,"teacher_disagreement_score":0.017633839,"about_ca_system_score_codex":0.0013509098,"about_ca_system_score_gemma":0.00114214,"threshold_uncertainty_score":0.039541185},"labels":[],"label_agreement":null},{"id":"W2005360691","doi":"10.1061/9780784413210.017","title":"Modal Integration for Improving Urban Mobility in Dhaka","year":2013,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Public transport; Context (archaeology); Transport engineering; Business; Transport system; Sustainable transport; Service (business); Interconnectivity; Engineering; Sustainability; Computer science","score_opus":0.006493595104245207,"score_gpt":0.17934868557660602,"score_spread":0.1728550904723608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005360691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6475906,0.0023019663,0.12826401,0.0016855107,0.00015828508,0.00042725017,0.00095968606,0.0004250955,0.21818759],"genre_scores_gemma":[0.9723795,0.0010517231,0.014801563,0.000044568213,0.000009057096,0.000105101375,0.0002161218,0.000015042928,0.011377345],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9998634,0.000035789522,0.00000760564,0.000022457381,0.00002700574,0.000043654505],"domain_scores_gemma":[0.9999511,0.000008740324,0.0000069174034,0.000005407091,0.000021008258,0.0000068805525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001501618,0.0003540804,0.0002102751,0.0005075807,0.0010976922,0.0013328576,0.0005433666,0.00033634575,0.008756316],"category_scores_gemma":[0.00035237547,0.00014126406,0.00036075732,0.00096997654,0.000400697,0.00091770466,0.0017869984,0.0002981588,0.00070651097],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039546296,0.00051163195,0.0356294,0.0011673609,0.00017960201,0.0015721531,0.003916897,0.20352326,0.047846247,0.35550645,0.0077635334,0.34198797],"study_design_scores_gemma":[0.00011297389,0.0013745826,0.09546662,0.00097522995,0.00054903893,0.0019361175,0.033130396,0.4722802,0.019907529,0.10107326,0.2728751,0.00031891605],"about_ca_topic_score_codex":0.023479668,"about_ca_topic_score_gemma":0.040478826,"teacher_disagreement_score":0.023479668,"about_ca_system_score_codex":0.0010477598,"about_ca_system_score_gemma":0.0011841807,"threshold_uncertainty_score":0.046685994},"labels":[],"label_agreement":null},{"id":"W2022081878","doi":"10.1061/9780784413210.025","title":"Conceptual Physical Design of Bus Rapid Transit (BRT) in Dhaka","year":2013,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bus rapid transit; Public transport; Transport engineering; Capital city; Business; Sustainable development; Transit (satellite); Traffic congestion; Population; Engineering; Geography; Environmental health","score_opus":0.013517265165353547,"score_gpt":0.1735024820536052,"score_spread":0.15998521688825165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022081878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42738146,0.0008324422,0.37383968,0.0012925576,0.00020228673,0.0015858026,0.0015827763,0.00074355665,0.19253942],"genre_scores_gemma":[0.9160752,0.000682931,0.062348172,0.000071750525,0.000011112806,0.0007627748,0.00043721942,0.00005211128,0.019558653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99975187,0.000082734805,0.000013150959,0.000045431276,0.000071211754,0.000035566798],"domain_scores_gemma":[0.9998884,0.000016437025,0.00001812285,0.000015484733,0.000042341686,0.000019266117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002284581,0.0005597547,0.0002558571,0.000539885,0.0011052944,0.0021137744,0.0010831532,0.00097150856,0.008754314],"category_scores_gemma":[0.00033417408,0.0004887818,0.0004986787,0.000575209,0.0012156838,0.00079197175,0.0011578652,0.000465459,0.0012648628],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029535595,0.00019010963,0.0062957695,0.0010686775,0.00005610467,0.0025686666,0.0026746828,0.6912752,0.06159865,0.18504709,0.0029790075,0.04595071],"study_design_scores_gemma":[0.00025517063,0.0021845903,0.017877007,0.00042833984,0.00023447617,0.0017715131,0.011589433,0.68904334,0.020408489,0.027534084,0.22841938,0.0002541334],"about_ca_topic_score_codex":0.009842455,"about_ca_topic_score_gemma":0.012974178,"teacher_disagreement_score":0.009842455,"about_ca_system_score_codex":0.0014530483,"about_ca_system_score_gemma":0.0020492394,"threshold_uncertainty_score":0.029286087},"labels":[],"label_agreement":null},{"id":"W2022311615","doi":"10.5539/cis.v4n2p21","title":"Simulation Model of Multiple Queueing Parameters: A Case of Vehicle Maintenance System","year":2011,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Queueing theory; Mean value analysis; Discrete event simulation; Set (abstract data type); Simulation software; Simulation modeling; Simulation; Real-time computing; Layered queueing network; Software; Operating system; Computer network","score_opus":0.026591580403762347,"score_gpt":0.20143839268144714,"score_spread":0.17484681227768478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022311615","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47782728,0.0008238911,0.49260616,0.0011999714,0.0002084836,0.00028635017,0.0009626114,0.0006851317,0.025400102],"genre_scores_gemma":[0.9787708,0.00029448268,0.013914579,0.000038668673,0.000036205915,0.0001497974,0.00018676645,0.000024182365,0.0065846173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999451,0.00017788324,0.000032095275,0.000104279476,0.00009829503,0.00013651508],"domain_scores_gemma":[0.99906296,0.0005205298,0.00010420639,0.00004981895,0.00020192846,0.000060610666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071525533,0.00064600963,0.0007277258,0.0005823006,0.0008495945,0.0011666645,0.0013547738,0.0019250755,0.0031997305],"category_scores_gemma":[0.0018832316,0.00037467486,0.00092336937,0.0006228043,0.0005999909,0.0009755131,0.00075728394,0.0011699381,0.00027686282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048995436,0.000035520567,0.0013885606,0.000031122014,0.000014411542,0.00026464261,0.00009543083,0.987706,0.00081174745,0.0074030836,0.00032182268,0.0018785166],"study_design_scores_gemma":[0.000010459185,0.000019837336,0.00018938805,0.0000030136762,0.0000072935245,0.000028166132,0.000020604033,0.9982602,0.0001821275,0.0010146138,0.00025891533,0.000005390694],"about_ca_topic_score_codex":0.02609334,"about_ca_topic_score_gemma":0.009236176,"teacher_disagreement_score":0.02609334,"about_ca_system_score_codex":0.0012631328,"about_ca_system_score_gemma":0.001136805,"threshold_uncertainty_score":0.051882923},"labels":[],"label_agreement":null},{"id":"W2022334978","doi":"10.5539/ass.v11n11p95","title":"Compensation for Loss of Commodity Value: Theoretical and Practical Aspects","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Compensation (psychology); Legislator; Normative; Value (mathematics); Liability; Law and economics; Business; Liability insurance; Actuarial science; Commodity; Legal liability; Law; Economics; Insurance policy; Political science; Accounting; Finance; Legislation; Psychology; Social psychology; Computer science","score_opus":0.02219323482608483,"score_gpt":0.28157370522210673,"score_spread":0.2593804703960219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022334978","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045087963,0.014339618,0.21821223,0.11959603,0.001302703,0.00029732106,0.00013808193,0.00008856868,0.6009375],"genre_scores_gemma":[0.93683,0.0065621804,0.02468973,0.0029240733,0.0014812582,0.00032219116,0.000051522424,0.00003815706,0.027100878],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9921302,0.00331649,0.00035649998,0.0007548242,0.002678386,0.0007635547],"domain_scores_gemma":[0.9848304,0.010822858,0.0013202323,0.0013227131,0.0014355422,0.00026821543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010157435,0.0010788733,0.0005856759,0.0028840278,0.0039946754,0.0097220605,0.0033925374,0.0095322635,0.0123970825],"category_scores_gemma":[0.023562212,0.0006906126,0.0008753184,0.002217107,0.03195035,0.015396575,0.0054153665,0.005739355,0.0008188339],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004466043,0.00001943846,0.00020923141,0.000032023367,0.0000018208095,0.000103506056,0.0001653125,0.0010448922,0.000032865104,0.99417686,0.0006837201,0.0035258778],"study_design_scores_gemma":[0.000006825336,0.000028509015,0.00038342352,0.00018632082,0.0000057038155,0.00031544644,0.000844449,0.0039651915,0.00022258188,0.9796468,0.014370515,0.000024142964],"about_ca_topic_score_codex":0.0032135304,"about_ca_topic_score_gemma":0.0027491837,"teacher_disagreement_score":0.0123970825,"about_ca_system_score_codex":0.0082776705,"about_ca_system_score_gemma":0.005126523,"threshold_uncertainty_score":0.06005895},"labels":[],"label_agreement":null},{"id":"W2069524024","doi":"10.5539/ass.v9n15p277","title":"Evolution of Back Lane Design: A View of Terrace Housing in Malaysia","year":2013,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Terrace (agriculture); Landscaping; Urbanization; Geography; Transport engineering; Architectural engineering; Civil engineering; Archaeology; Economic growth; Engineering","score_opus":0.013427465996080272,"score_gpt":0.2162023062505911,"score_spread":0.2027748402545108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069524024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92588216,0.010497022,0.0021354016,0.0010422631,0.000038619182,0.000024281715,0.00025105322,0.000022227101,0.060106885],"genre_scores_gemma":[0.991026,0.0033955572,0.00079523015,0.000039457704,0.0000048058646,0.000003446507,0.000050117862,0.000004911904,0.004680353],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998381,0.000053337604,0.0000080103255,0.000033799428,0.000029699251,0.000037034355],"domain_scores_gemma":[0.99987364,0.000016741558,0.000047944675,0.00000850365,0.000032293257,0.000020908934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001993621,0.00021385818,0.00007971389,0.0011948341,0.0006186196,0.001370473,0.00035695807,0.0002484271,0.0021981199],"category_scores_gemma":[0.00033051646,0.00012934055,0.00014139153,0.0013580984,0.0013523084,0.0011971849,0.00091752113,0.0003287074,0.00020397468],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024917434,0.000118445154,0.3858915,0.0014832114,0.000096129515,0.009500903,0.10654129,0.008249625,0.008531731,0.17318556,0.0042019314,0.30195045],"study_design_scores_gemma":[0.0000039648535,0.0003037326,0.74480367,0.0008455153,0.00006427929,0.005661035,0.12409708,0.0037536784,0.0042983755,0.00799786,0.1080898,0.000080995975],"about_ca_topic_score_codex":0.023149168,"about_ca_topic_score_gemma":0.053915076,"teacher_disagreement_score":0.023149168,"about_ca_system_score_codex":0.0026594526,"about_ca_system_score_gemma":0.0011056603,"threshold_uncertainty_score":0.046028852},"labels":[],"label_agreement":null},{"id":"W2098722112","doi":"","title":"Canadian Journal of Basic and Applied Sciences","year":2014,"lang":"en","type":"article","venue":"ADVANCED SCIENCES INDEX","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"The arts; Social science; Recreation; Engineering ethics; Sociology; Engineering; Earth science; Political science","score_opus":0.00677954789347609,"score_gpt":0.19821269689375748,"score_spread":0.19143314900028138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098722112","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011173622,0.055204757,0.002064309,0.023045676,0.021597082,0.00029390844,0.009609276,0.00059946283,0.8864681],"genre_scores_gemma":[0.021455104,0.07895235,0.0051151244,0.0044405004,0.0033146415,0.0002218762,0.007974319,0.00048091728,0.87804526],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99520713,0.0002487971,0.00029975048,0.00032102,0.0035157648,0.00040752263],"domain_scores_gemma":[0.987812,0.0007139945,0.00021444139,0.0009822781,0.008772593,0.0015047535],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.002979858,0.0012296482,0.0017235334,0.0062846174,0.005584388,0.01030866,0.0021116019,0.0020925435,0.33322093],"category_scores_gemma":[0.010780642,0.0005683613,0.00088637305,0.009697992,0.0030210528,0.0020429087,0.0024965343,0.0026496577,0.120757334],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055118107,0.00005062265,0.00054559804,0.00083480595,0.000019418372,0.00013536023,0.00013421914,0.00016524232,0.0006811337,0.028729867,0.8307592,0.13788947],"study_design_scores_gemma":[0.0000034362226,0.0000047824115,0.00056744664,0.00010544298,0.000004181135,0.000038022772,0.000069639005,0.00005054392,0.00006879265,0.001511662,0.99756914,0.0000067600704],"about_ca_topic_score_codex":0.43162253,"about_ca_topic_score_gemma":0.4834478,"teacher_disagreement_score":0.66677904,"about_ca_system_score_codex":0.017127778,"about_ca_system_score_gemma":0.08569766,"threshold_uncertainty_score":0.9510794},"labels":[],"label_agreement":null},{"id":"W2178278904","doi":"10.20961/arst.v13i2.15638","title":"EVALUASI KINERJA RUAS JALAN TERHADAP PERKEMBANGAN KEGIATAN PERDAGANGAN DAN JASA DI RUAS JALAN YOSODIPURO, KOTA SURAKARTA","year":2017,"lang":"en","type":"article","venue":"Arsitektura","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Downtown; Business administration; Business; Geography","score_opus":0.014696779129243035,"score_gpt":0.2203519111948515,"score_spread":0.20565513206560848,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178278904","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30099908,0.0155814355,0.0037482544,0.014078734,0.0029344659,0.0004878211,0.0020678567,0.00061179,0.65949064],"genre_scores_gemma":[0.36010152,0.008581638,0.0073450464,0.001293578,0.00021468555,0.00024320796,0.0013541811,0.00024463882,0.6206215],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99974245,0.000043080592,0.000009550271,0.000052917363,0.0000760207,0.00007602273],"domain_scores_gemma":[0.9996716,0.00003304259,0.0000213466,0.000018222618,0.00013885788,0.00011695995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053133466,0.00056633435,0.0003552804,0.0005068707,0.002895634,0.0022948158,0.00044919914,0.0005738187,0.07247293],"category_scores_gemma":[0.0005880921,0.00021213642,0.0002191675,0.000721755,0.00068189565,0.0011989094,0.0012840728,0.0010580865,0.013215582],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006703341,0.0008446312,0.03902522,0.0027914422,0.00006906837,0.004383893,0.028607178,0.0010207103,0.03424254,0.042301204,0.22947489,0.6165689],"study_design_scores_gemma":[0.000019813735,0.00016505536,0.042448767,0.00043464446,0.00003254543,0.0008627762,0.019489424,0.00026516328,0.0028635778,0.001312574,0.93206954,0.00003626795],"about_ca_topic_score_codex":0.010710519,"about_ca_topic_score_gemma":0.044744886,"teacher_disagreement_score":0.07247293,"about_ca_system_score_codex":0.0019329617,"about_ca_system_score_gemma":0.0052718506,"threshold_uncertainty_score":0.24244612},"labels":[],"label_agreement":null},{"id":"W2179912507","doi":"10.14710/tataloka.16.4.194-208","title":"MODEL KERJASAMA ANTAR DAERAH DALAM PERENCANAAN SISTEM TRANSPORTASI WILAYAH METROPOLITAN BANDUNG RAYA (Inter-regional Cooperation Model of Transportation System Planning in the Greater Bandung Metropolitan)","year":2014,"lang":"en","type":"article","venue":"Jurnal Tataloka","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Metropolitan area; Decentralization; Business; Local government; Negotiation; Database transaction; Enforcement; Agency (philosophy); Transaction cost; Government (linguistics); Public administration; Finance; Economics; Geography; Political science","score_opus":0.027254237617290247,"score_gpt":0.22531052383145406,"score_spread":0.19805628621416382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2179912507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59396833,0.0023460097,0.17689475,0.0043577077,0.0004135566,0.00031968116,0.0053498065,0.0005114765,0.21583858],"genre_scores_gemma":[0.94720536,0.0005607754,0.009887746,0.00008207367,0.000027815107,0.0002425014,0.0010910674,0.000050536783,0.040852245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997861,0.00007121657,0.000008572128,0.000055886954,0.000030523457,0.000047694637],"domain_scores_gemma":[0.9996785,0.00014221972,0.000036250098,0.000012333924,0.00009929209,0.000031502022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038138116,0.0005427232,0.00042535408,0.0004693253,0.0006153757,0.0016340541,0.0010809972,0.001058515,0.011940889],"category_scores_gemma":[0.0008124351,0.00030353083,0.00072181516,0.00049647514,0.000440499,0.0009243451,0.0007255597,0.0007834537,0.00085424713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086867265,0.00006658154,0.0050571403,0.00010330934,0.000043394157,0.0003348029,0.00021632532,0.9448231,0.00053581997,0.039150897,0.0034846512,0.00609708],"study_design_scores_gemma":[0.000022439104,0.000029680725,0.001437717,0.00002821557,0.000029086643,0.000059714024,0.00025338327,0.986917,0.00013831804,0.006718937,0.004355424,0.000010073801],"about_ca_topic_score_codex":0.054556403,"about_ca_topic_score_gemma":0.042079482,"teacher_disagreement_score":0.054556403,"about_ca_system_score_codex":0.0016000012,"about_ca_system_score_gemma":0.001707304,"threshold_uncertainty_score":0.10847771},"labels":[],"label_agreement":null},{"id":"W2183719458","doi":"","title":"CITY OF TORONTO BY-LAW No. 1166-2012 To name the public lane located south of Front Street East, extending easterly from Princess Street to Berkeley Street as Nicholson Lane.","year":2012,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Front (military); Law; Geography; Political science; Meteorology","score_opus":0.015327857277403252,"score_gpt":0.2164232169301137,"score_spread":0.20109535965271047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183719458","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038509497,0.0015314587,0.0011305037,0.009163261,0.0016405651,0.000496658,0.046197716,0.000971935,0.93501693],"genre_scores_gemma":[0.00862101,0.0004985795,0.00040571167,0.0017111652,0.00012278397,0.00017450987,0.0051257396,0.00020817116,0.9831323],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99753124,0.000111033616,0.00015076884,0.00033605628,0.0012701387,0.0006007672],"domain_scores_gemma":[0.9948547,0.0005221516,0.00018251744,0.00052227214,0.0034893034,0.00042905883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009591248,0.0011352933,0.000799733,0.0012146014,0.0073217424,0.0051571275,0.0016255683,0.0060733557,0.18600269],"category_scores_gemma":[0.0047549694,0.0011633951,0.0004694741,0.0032348945,0.0013316243,0.0016628591,0.0013258499,0.0034306392,0.081149004],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040186907,0.000018647093,0.00080771535,0.00012132444,0.0000045442225,0.00009921438,0.00047037567,0.0001078338,0.00029476738,0.025841704,0.9655475,0.0066461987],"study_design_scores_gemma":[0.00001370521,0.000012070997,0.003418028,0.0000791669,0.000006978154,0.000027081533,0.00023347045,0.00011075729,0.00022187413,0.000461693,0.99539524,0.000019863372],"about_ca_topic_score_codex":0.90048826,"about_ca_topic_score_gemma":0.96581864,"teacher_disagreement_score":0.18600269,"about_ca_system_score_codex":0.02102001,"about_ca_system_score_gemma":0.034127466,"threshold_uncertainty_score":0.622241},"labels":[],"label_agreement":null},{"id":"W2185513479","doi":"","title":"CITY OF TORONTO BY-LAW No. 245-2015 To amend City of Toronto Municipal Code Chapter 950, Traffic and Parking, respecting Lonsdale Road. The Council of the City of Toronto enacts: 1. Municipal Code Chapter 950, Traffic and Parking, is amended as follows: A. By inserting in Schedule XXXV (Speed Limits on Public Highways) in § 950-1334, the following in alphabetical order by street name:","year":2015,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"City centre; Law; Engineering; Political science; Civil engineering","score_opus":0.04440770798313722,"score_gpt":0.25987057516177076,"score_spread":0.21546286717863353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2185513479","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048471256,0.002342901,0.0016960512,0.015346113,0.004254887,0.0007205781,0.07601866,0.00094950234,0.8938241],"genre_scores_gemma":[0.016571032,0.0007633605,0.00094009726,0.0040784525,0.00023103882,0.00027473876,0.012011454,0.00029559646,0.9648343],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99632394,0.00014018267,0.00019181616,0.0003653236,0.0020496715,0.0009290864],"domain_scores_gemma":[0.9927797,0.00046824012,0.0002173239,0.00048656427,0.0052388445,0.0008093728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013358301,0.0008786065,0.00065174664,0.0011846042,0.0074769245,0.0068526673,0.0017436692,0.0046689636,0.12936667],"category_scores_gemma":[0.0060560065,0.0011640037,0.00053895975,0.0025821787,0.0012712054,0.0015785919,0.0014223068,0.0033219655,0.059791133],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023752744,0.000009352347,0.0005245548,0.00007709596,0.0000031823977,0.00004547348,0.00046007885,0.000068713016,0.00015506263,0.021451946,0.973871,0.0033098632],"study_design_scores_gemma":[0.00001171893,0.000007524287,0.004247081,0.00007083047,0.000007931754,0.000017828383,0.0003639155,0.000082338134,0.0001608581,0.00046296898,0.99454874,0.000018345543],"about_ca_topic_score_codex":0.9556805,"about_ca_topic_score_gemma":0.98309934,"teacher_disagreement_score":0.12936667,"about_ca_system_score_codex":0.03637155,"about_ca_system_score_gemma":0.08313358,"threshold_uncertainty_score":0.4327746},"labels":[],"label_agreement":null},{"id":"W2245036069","doi":"","title":"Risk-Based Model for Effective Marshalling of Dangerous Goods Railway Cars","year":2010,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Marshalling; Transport engineering; Dangerous goods; Engineering; Business; Risk analysis (engineering); Civil engineering; Computer science","score_opus":0.006170572498440788,"score_gpt":0.1802612802685412,"score_spread":0.17409070777010044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2245036069","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06074427,0.0011430889,0.88814926,0.0017901104,0.00022092403,0.00028484862,0.001143879,0.0006766535,0.045846954],"genre_scores_gemma":[0.89981365,0.0010734136,0.050897647,0.00021565362,0.00010161286,0.0005919696,0.0006539041,0.00019186485,0.04646024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897766,0.0003562791,0.000054675376,0.00019498891,0.00020384874,0.00021251767],"domain_scores_gemma":[0.99775285,0.0012820913,0.00028587226,0.00005726017,0.0004376409,0.00018443487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024826226,0.001860342,0.002170177,0.0015378365,0.0011517439,0.0038327894,0.0034845169,0.0046185595,0.010943731],"category_scores_gemma":[0.0039722095,0.0014903282,0.0017567145,0.001120398,0.0015759133,0.002154809,0.002265846,0.0030816917,0.0014901998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011730791,0.000008732819,0.00009407739,0.000010866666,0.000006102744,0.000038010083,0.000015545844,0.99579084,0.00008516547,0.0030932939,0.0001444718,0.0007011075],"study_design_scores_gemma":[0.000006558798,0.000009777381,0.00003666859,0.0000051682327,0.0000057415746,0.0000062405147,0.0000107977485,0.9983493,0.000030482413,0.001315683,0.0002177835,0.0000057452444],"about_ca_topic_score_codex":0.044273313,"about_ca_topic_score_gemma":0.017767278,"teacher_disagreement_score":0.044273313,"about_ca_system_score_codex":0.003617517,"about_ca_system_score_gemma":0.0031448116,"threshold_uncertainty_score":0.08803123},"labels":[],"label_agreement":null},{"id":"W2277226485","doi":"","title":"Approaches to Solve the Problem of Passive Safety of Passenger Wagon","year":2014,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Road and Rail Infrastructure CETRA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Train; Transport engineering; Passenger transport; Legislation; Vehicle safety; Passenger train; Engineering; Automotive engineering","score_opus":0.02244299040462234,"score_gpt":0.19172241629880332,"score_spread":0.169279425894181,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2277226485","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004783959,0.00086074974,0.9838405,0.000305608,0.00007271368,0.00004509584,0.000031351457,0.00004001501,0.010019976],"genre_scores_gemma":[0.411333,0.006402904,0.55300003,0.00037976983,0.0004787338,0.0005021065,0.0002827517,0.00014028636,0.027480412],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99942267,0.00019106947,0.00003147772,0.000117378964,0.00017648216,0.00006105643],"domain_scores_gemma":[0.9993698,0.00029435303,0.000084017665,0.000054013944,0.00017195006,0.00002594189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011007326,0.0013508764,0.00068613776,0.001477103,0.0006726807,0.0015171632,0.0017739277,0.0016371203,0.0035314283],"category_scores_gemma":[0.0020874606,0.0005014304,0.0014873013,0.00067574915,0.0016067986,0.0016960027,0.0021667155,0.0021477828,0.0005777213],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033283286,0.000078904595,0.0008731431,0.0005482222,0.000087683846,0.00021207405,0.0005052396,0.33733878,0.0036679106,0.5996961,0.0018553141,0.05510327],"study_design_scores_gemma":[0.000021069674,0.00013602391,0.000489039,0.00019018362,0.000065336666,0.00018491772,0.00041394768,0.56794244,0.0017599042,0.4052477,0.023511222,0.000038223414],"about_ca_topic_score_codex":0.0028731427,"about_ca_topic_score_gemma":0.0020507171,"teacher_disagreement_score":0.0035314283,"about_ca_system_score_codex":0.0010229752,"about_ca_system_score_gemma":0.0015209066,"threshold_uncertainty_score":0.011813819},"labels":[],"label_agreement":null},{"id":"W23055835","doi":"10.1371/journal.pmed.1001322","title":"ANALISIS PERBANDINGAN TINGKAT KEPUASAN PENUMPANG ATAS PELAYAAN JASA (STUDI KASUS PADA PERUM DAMRI UABK SEMARANG JALUR NGALIAN-PUCANG GADING DAN TERBOYO MANGKANG)","year":2009,"lang":"en","type":"dissertation","venue":"PLoS Medicine","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Canadian Institutes of Health Research","keywords":"Humanities; Business; Business administration; Art","score_opus":0.014118945598488105,"score_gpt":0.22913589803352363,"score_spread":0.21501695243503552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W23055835","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9742286,0.0023274473,0.0011183115,0.0010534207,0.00015013141,0.0003405204,0.00091761636,0.00002215505,0.019841813],"genre_scores_gemma":[0.9202842,0.0051028496,0.0044486374,0.0014062793,0.000060299793,0.00048193097,0.000942024,0.00005056407,0.06722314],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990933,0.00018397193,0.000056076657,0.00012855147,0.00024531895,0.00029274356],"domain_scores_gemma":[0.9985623,0.00035617786,0.00016267711,0.000066383844,0.000639169,0.00021333864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015121296,0.00035589212,0.00033057603,0.0007980167,0.0022967095,0.0017977358,0.0005321106,0.00067637087,0.009258622],"category_scores_gemma":[0.0030103591,0.0002297366,0.0002565078,0.0010343706,0.0007831939,0.00062202686,0.0007212703,0.001134686,0.0015158925],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008252035,0.0014069556,0.40696132,0.0021153684,0.00018248968,0.004335213,0.25449997,0.000159001,0.025129123,0.0022416217,0.016242824,0.28590095],"study_design_scores_gemma":[0.00001583627,0.0005758493,0.66508156,0.0008563935,0.00014443223,0.0016479378,0.26039764,0.00011425289,0.005452752,0.00044433223,0.06522677,0.000042245563],"about_ca_topic_score_codex":0.11282678,"about_ca_topic_score_gemma":0.23549435,"teacher_disagreement_score":0.11282678,"about_ca_system_score_codex":0.0021861047,"about_ca_system_score_gemma":0.0038363012,"threshold_uncertainty_score":0.22434008},"labels":[],"label_agreement":null},{"id":"W2468136605","doi":"","title":"KEBUTUHAN FREKUENSI PENERBANGAN RUTE JAKARTA â€“ JOGYAKARTA â€“ JAKARTA PT INDONESIA AIR ASIA","year":2016,"lang":"id","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Field survey; Geography; Advertising; Business; Cartography","score_opus":0.008026822484809263,"score_gpt":0.1857875881466333,"score_spread":0.17776076566182403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2468136605","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23186146,0.032335736,0.012726351,0.008439177,0.0055709854,0.00024342557,0.007902413,0.0017148687,0.6992056],"genre_scores_gemma":[0.32261467,0.01486493,0.009731891,0.000508668,0.00022005537,0.00012754236,0.0032767933,0.00046618367,0.6481892],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997991,0.000015519094,0.000010015352,0.00005269439,0.0000748193,0.000047930902],"domain_scores_gemma":[0.99981683,0.000028470977,0.000025458961,0.000014416394,0.00007359864,0.00004115482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027940213,0.00076376233,0.00042835443,0.00071951543,0.0009602531,0.0022866542,0.00026960764,0.00048363092,0.07812641],"category_scores_gemma":[0.0004089218,0.00028357364,0.00030896664,0.00066625926,0.0004367805,0.0010312751,0.0008035681,0.0009615133,0.022999346],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011983026,0.00051603717,0.026583962,0.0018174481,0.00013966316,0.0033008526,0.0008993186,0.0056530824,0.020336002,0.028464194,0.21928014,0.69181097],"study_design_scores_gemma":[0.00003049108,0.00016973604,0.07944159,0.0004984853,0.000055506018,0.0022521087,0.001590406,0.0033064382,0.01233866,0.002277667,0.89795214,0.00008682937],"about_ca_topic_score_codex":0.010813699,"about_ca_topic_score_gemma":0.019560294,"teacher_disagreement_score":0.07812641,"about_ca_system_score_codex":0.0015974598,"about_ca_system_score_gemma":0.0024691303,"threshold_uncertainty_score":0.26135886},"labels":[],"label_agreement":null},{"id":"W2591930544","doi":"10.5555/arwg.13.2.g240w6g8ww015711","title":"Delineating catchment areas of selected KTM komuter stations in the kuala lumpur conurbation using a gis-based approach","year":2010,"lang":"en","type":"article","venue":"Arab world geographer","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Conurbation; Kuala lumpur; Catchment area; Park and ride; Geographic information system; Geography; Public transport; Drainage basin; Transport engineering; Environmental resource management; Environmental planning; Environmental science; Engineering; Cartography; Business; Archaeology","score_opus":0.011048113114415475,"score_gpt":0.22114943440064738,"score_spread":0.2101013212862319,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2591930544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99473333,0.00006640325,0.001104946,0.000025031532,0.0000011431785,0.00011504219,0.00088327384,0.000029954734,0.0030407398],"genre_scores_gemma":[0.9916944,0.00012112034,0.0051056687,0.0000046659175,0.0000015480997,0.000165613,0.0009722784,0.000008377619,0.0019262262],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99983656,0.000042834,0.000018551518,0.000026514004,0.000036543886,0.000038930084],"domain_scores_gemma":[0.99979454,0.00006438533,0.000048228176,0.000012075444,0.000057605645,0.000023173832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020167627,0.00021615089,0.00021439268,0.0026281644,0.0004762328,0.0009930123,0.00031644022,0.00019167714,0.0022751],"category_scores_gemma":[0.0007936009,0.0001955999,0.0001780503,0.0050305086,0.00029186273,0.0003046891,0.00077137846,0.00011628624,0.00029768614],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054171134,0.00026413202,0.6943941,0.00071637216,0.00014989544,0.0027140628,0.014734456,0.057490494,0.013479615,0.0052432083,0.0028137015,0.20745821],"study_design_scores_gemma":[0.000018066003,0.00008980211,0.9183149,0.00007249255,0.00007349103,0.00035921088,0.016474443,0.052035227,0.0036342745,0.0006107371,0.008259399,0.000057958823],"about_ca_topic_score_codex":0.110710606,"about_ca_topic_score_gemma":0.15801208,"teacher_disagreement_score":0.110710606,"about_ca_system_score_codex":0.0015214013,"about_ca_system_score_gemma":0.0014148294,"threshold_uncertainty_score":0.22013241},"labels":[],"label_agreement":null},{"id":"W2592491924","doi":"","title":"Faktor-Faktor Kinerja Green Terminal Hamid Rusdi Kota Malang","year":2015,"lang":"id","type":"article","venue":"Research Repository Universitas Islam Negeri Maulana Malik Ibrahim (University of Southampton)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Kristen Petra; Universitas Sebelas Maret; Chalmers Tekniska Högskola; McGill University; Universitas Diponegoro; De La Salle University","keywords":"Humanities; Philosophy","score_opus":0.04682722551976702,"score_gpt":0.2395703890517997,"score_spread":0.1927431635320327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592491924","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8564659,0.010225139,0.008596777,0.0027747294,0.00066542934,0.00034945598,0.0048532686,0.00079945434,0.11526978],"genre_scores_gemma":[0.83277255,0.0044335644,0.006198545,0.00048338695,0.00006702882,0.00015119246,0.0039892094,0.00010820293,0.15179637],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99967897,0.000035102767,0.000016959202,0.00007350882,0.00009765576,0.00009791696],"domain_scores_gemma":[0.9996786,0.000033442077,0.00006255231,0.00003357969,0.000109219436,0.00008260055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028626312,0.00073518255,0.00043847066,0.0005596,0.0014522695,0.0015839437,0.0004245358,0.0006983701,0.0242861],"category_scores_gemma":[0.00035530768,0.0003101155,0.00046264962,0.0006069162,0.00046456628,0.0006835486,0.001038451,0.00090679637,0.0060025426],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021012942,0.0004390913,0.0774268,0.0026537804,0.0001563936,0.004504935,0.0035415303,0.0013568708,0.6722116,0.010828574,0.020173496,0.20460564],"study_design_scores_gemma":[0.00015136844,0.0010847753,0.20917915,0.00043695606,0.00031553337,0.0049785846,0.008219143,0.0021786175,0.2343005,0.0019613795,0.53701204,0.00018204738],"about_ca_topic_score_codex":0.0097388355,"about_ca_topic_score_gemma":0.01508607,"teacher_disagreement_score":0.0242861,"about_ca_system_score_codex":0.0012068857,"about_ca_system_score_gemma":0.0017298597,"threshold_uncertainty_score":0.081245065},"labels":[],"label_agreement":null},{"id":"W2600944073","doi":"","title":"Interrelation of the Problems of the Aircraft Fleet Development and the Improvement of the Air Traffic Control System","year":2016,"lang":"en","type":"article","venue":"The Journal of Internet Banking and Commerce","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Air traffic control; Air transport; Modernization theory; Computer science; Control (management); Transport engineering; Operations research; Development (topology); Traffic congestion; Aviation; Aeronautics; Engineering; Aerospace engineering; Political science","score_opus":0.00539131929704243,"score_gpt":0.16292849916176497,"score_spread":0.15753717986472254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600944073","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74194705,0.013952149,0.061230607,0.022167193,0.0004287238,0.00018062051,0.0011933103,0.00011357478,0.15878676],"genre_scores_gemma":[0.9877649,0.003419699,0.004542266,0.0001241127,0.0001184765,0.00003795113,0.00015265483,0.000012723534,0.0038272666],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99781907,0.0008893123,0.0001779629,0.00027801562,0.0005213964,0.0003143436],"domain_scores_gemma":[0.99429274,0.0023799657,0.0013870174,0.0002405322,0.0014048549,0.00029493225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001586166,0.0003111007,0.0003011967,0.0025929222,0.000941616,0.003304476,0.00031992717,0.00094857207,0.0029406967],"category_scores_gemma":[0.0073120864,0.00019168573,0.00030340007,0.0030739154,0.0018044963,0.0021437071,0.001343048,0.0010954024,0.00015747981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022763533,0.0002569679,0.14800276,0.00073447527,0.00018109268,0.001403442,0.0026891753,0.090504006,0.0022919404,0.61997765,0.00926589,0.124464914],"study_design_scores_gemma":[0.0000372638,0.00031061386,0.4624659,0.00066059595,0.0001881546,0.0014596318,0.00787816,0.106917255,0.004296484,0.28941005,0.12621607,0.00015989687],"about_ca_topic_score_codex":0.008757665,"about_ca_topic_score_gemma":0.0058189775,"teacher_disagreement_score":0.008757665,"about_ca_system_score_codex":0.00320821,"about_ca_system_score_gemma":0.0042659407,"threshold_uncertainty_score":0.023277283},"labels":[],"label_agreement":null},{"id":"W2605051735","doi":"10.33558/bentang.v5i1.146","title":"KAJIAN BENTUK GEOMETRIK INTERCHANGE KRUKUT PADA RUAS JALAN TOL DEPOK – ANTASARI (DEPANTAS) DAN CINERE – JAGORAWI (CIJAGO) BERDASARKAN SISTEM PEMBAYARAN TERBUKA","year":2018,"lang":"id","type":"article","venue":"Bentang Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.01626820109023097,"score_gpt":0.23161468725665016,"score_spread":0.2153464861664192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605051735","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7213792,0.0050867177,0.024773454,0.002680315,0.00037295124,0.0003231104,0.0018699778,0.00071962515,0.2427946],"genre_scores_gemma":[0.7327073,0.0022584805,0.022977509,0.0005260821,0.000066191795,0.00016935325,0.0017335553,0.0004329101,0.23912853],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99949396,0.00006395626,0.000025653191,0.00009961403,0.0001669168,0.00014987175],"domain_scores_gemma":[0.9996798,0.000039835486,0.0000596173,0.000047023517,0.00010557261,0.000068186004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004751798,0.00064768246,0.0005156612,0.0010381963,0.0031123548,0.003525803,0.0007101257,0.0008690241,0.031729173],"category_scores_gemma":[0.00049719453,0.00045969157,0.0006099089,0.0014686338,0.0011248147,0.0014108071,0.0030011155,0.0013523774,0.006311361],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012261579,0.00039437343,0.08554398,0.0014882894,0.00020508369,0.0042803134,0.015117969,0.002766835,0.36011648,0.042763826,0.019998582,0.46609804],"study_design_scores_gemma":[0.00005225885,0.00052436173,0.19485576,0.00026124017,0.00015352847,0.002196778,0.023314225,0.0013910286,0.058813058,0.0037354664,0.7145774,0.0001249533],"about_ca_topic_score_codex":0.021735495,"about_ca_topic_score_gemma":0.07090808,"teacher_disagreement_score":0.031729173,"about_ca_system_score_codex":0.002327438,"about_ca_system_score_gemma":0.0028081108,"threshold_uncertainty_score":0.10614461},"labels":[],"label_agreement":null},{"id":"W2608183264","doi":"10.5614/jts.2017.24.1.3","title":"The Potency of Halim Perdanakusuma Airport Development as Commercial Airport","year":2017,"lang":"en","type":"paratext","venue":"Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada); WiLAN (Canada)","funders":"","keywords":"Aviation; International airport; Service (business); Constraint (computer-aided design); Aeronautics; Business; Engineering; Transport engineering; Marketing; Aerospace engineering; Mechanical engineering","score_opus":0.01384335790217354,"score_gpt":0.23768988154453038,"score_spread":0.22384652364235685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608183264","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7343837,0.0076100123,0.0070233066,0.0029042037,0.00022554774,0.00014294911,0.0006803519,0.00006120125,0.24696875],"genre_scores_gemma":[0.98172945,0.0032028258,0.0015564717,0.00016116987,0.00006339548,0.000028756267,0.00026670215,0.000017472323,0.012973716],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906665,0.00018760099,0.000038068483,0.00008940368,0.00038768502,0.00023054288],"domain_scores_gemma":[0.9985567,0.0002980755,0.00032134075,0.000055376247,0.00052806403,0.00024058315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000576932,0.00047941948,0.0001946269,0.0010808269,0.00081697665,0.0038616536,0.00036548582,0.00040015194,0.006610343],"category_scores_gemma":[0.0009218429,0.00013093738,0.00039374182,0.0012746303,0.0005590951,0.0020299647,0.001160366,0.00058204395,0.0007360381],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008501196,0.0003239838,0.45070234,0.0023006583,0.00022883463,0.010931566,0.0051673567,0.025123367,0.02971591,0.15184309,0.02717627,0.29563653],"study_design_scores_gemma":[0.000027730184,0.00069600507,0.5398587,0.0008220717,0.00030498594,0.0064362683,0.039731126,0.02715122,0.016781485,0.014875275,0.353125,0.00019019538],"about_ca_topic_score_codex":0.006999098,"about_ca_topic_score_gemma":0.012883186,"teacher_disagreement_score":0.006999098,"about_ca_system_score_codex":0.0021446722,"about_ca_system_score_gemma":0.00213791,"threshold_uncertainty_score":0.02211374},"labels":[],"label_agreement":null},{"id":"W2609751471","doi":"","title":"Swept Path Analysis on Roundabouts for Three-axle Buses - Review of the Croatian Design Guidelines","year":2016,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Road and Rail Infrastructure CETRA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Roundabout; Axle; Geometric design; Transport engineering; Engineering; Computer science; Mechanical engineering","score_opus":0.034502354974500826,"score_gpt":0.2576312044277158,"score_spread":0.22312884945321498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2609751471","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017805865,0.04192929,0.8705157,0.00083273737,0.0010046944,0.0003384319,0.00078910886,0.0008767254,0.0659075],"genre_scores_gemma":[0.36542654,0.089861505,0.49930456,0.00043253563,0.00047186943,0.0004979485,0.0026773037,0.0011265142,0.040201243],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968182,0.00074775115,0.00026536878,0.00037702575,0.0016039937,0.00018772225],"domain_scores_gemma":[0.99733305,0.000558608,0.00021641413,0.0001515296,0.0016939652,0.00004651592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002037344,0.0020525604,0.0011346304,0.005101587,0.0010158288,0.0022978922,0.0025407206,0.0011998169,0.008613687],"category_scores_gemma":[0.003312621,0.0011677714,0.0014113582,0.0026327707,0.0015269077,0.0016315924,0.0011826144,0.0013506345,0.0029854353],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010383261,0.00009987361,0.0031709739,0.002964995,0.000062880434,0.00035478474,0.0005396383,0.35022888,0.0052305106,0.072848804,0.018865136,0.5455297],"study_design_scores_gemma":[0.000034868448,0.00033365857,0.007021452,0.0042255516,0.00015776607,0.0010807038,0.0019542135,0.26559904,0.010232665,0.031796273,0.6772532,0.0003106105],"about_ca_topic_score_codex":0.023176832,"about_ca_topic_score_gemma":0.029494897,"teacher_disagreement_score":0.023176832,"about_ca_system_score_codex":0.0022982496,"about_ca_system_score_gemma":0.0027558699,"threshold_uncertainty_score":0.046083808},"labels":[],"label_agreement":null},{"id":"W2615285394","doi":"10.36055/jft.v5i2.1253","title":"PERENCANAAN GEOMETRIK JALAN ALTERNATIF PALIMA-CURUG ((Studi Kasus : Kota Serang)","year":2016,"lang":"id","type":"article","venue":"Fondasi Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Humanities; Political science","score_opus":0.012405410275869486,"score_gpt":0.20941967732342542,"score_spread":0.19701426704755592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2615285394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75253266,0.028494589,0.0069210413,0.0037844907,0.00046139504,0.00048745298,0.0030514693,0.0002973708,0.20396958],"genre_scores_gemma":[0.87171006,0.014150408,0.007540151,0.0012660059,0.00005800325,0.00018555784,0.0013657232,0.000120501834,0.10360355],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995401,0.00007956224,0.000019597972,0.00013551427,0.00014432342,0.00008099161],"domain_scores_gemma":[0.9997466,0.00005563026,0.0000531328,0.000026580528,0.00008730203,0.000030696992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047649886,0.00056815497,0.000586922,0.0006954107,0.0014107621,0.0027049605,0.00058740133,0.0007150965,0.01967102],"category_scores_gemma":[0.0004929345,0.00034472204,0.0007014895,0.0013484361,0.0006945096,0.0014495731,0.0012753189,0.0010890508,0.0034658306],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021441984,0.0015767481,0.06844529,0.0068678176,0.00041938588,0.0027135767,0.012916634,0.00235685,0.38382307,0.030246565,0.022453822,0.46603617],"study_design_scores_gemma":[0.0001167271,0.0024058132,0.21879064,0.0007544559,0.0004897556,0.0021912532,0.016817175,0.0014426286,0.09758037,0.007261401,0.6519485,0.00020130088],"about_ca_topic_score_codex":0.017356202,"about_ca_topic_score_gemma":0.047852654,"teacher_disagreement_score":0.01967102,"about_ca_system_score_codex":0.0020905004,"about_ca_system_score_gemma":0.001469401,"threshold_uncertainty_score":0.06580615},"labels":[],"label_agreement":null},{"id":"W2739713756","doi":"10.29103/tj.v5i2.11","title":"ANALISIS TINGKAT PELAYANAN JALAN (Studi Kasus Jalan Medan-Banda Aceh km 254+800 s.d km 256+700)","year":2021,"lang":"id","type":"article","venue":"Teras Jurnal Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.012452559794439107,"score_gpt":0.22397749291203817,"score_spread":0.21152493311759907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2739713756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9401163,0.004307941,0.0009657133,0.0005636196,0.00013291156,0.00021011973,0.0115078,0.00011653231,0.042079147],"genre_scores_gemma":[0.94287074,0.0034276247,0.0013053175,0.00025091332,0.000065356464,0.00032739903,0.006931653,0.00012463493,0.044696428],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992213,0.00016257798,0.000058270045,0.0002039885,0.00016907,0.0001848272],"domain_scores_gemma":[0.9989894,0.00020608869,0.00018270935,0.000047861224,0.000439308,0.00013467917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006913422,0.0006544274,0.00052578776,0.0015647127,0.0010380592,0.0022034706,0.0006153071,0.00040454225,0.017875088],"category_scores_gemma":[0.001040432,0.00032619748,0.00080989016,0.0025820546,0.00039008624,0.0011067473,0.00087147945,0.0007623234,0.004412021],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010031322,0.00037826307,0.8570485,0.0026460474,0.00073287764,0.0015253883,0.0151093695,0.000667091,0.0063758674,0.0022058755,0.018247483,0.094060265],"study_design_scores_gemma":[0.000010549418,0.00019462552,0.925008,0.00022864708,0.00018497377,0.00050131313,0.036618195,0.00013241523,0.0010448871,0.00013006601,0.035920475,0.00002575704],"about_ca_topic_score_codex":0.030599533,"about_ca_topic_score_gemma":0.06318709,"teacher_disagreement_score":0.030599533,"about_ca_system_score_codex":0.0011241287,"about_ca_system_score_gemma":0.0010702682,"threshold_uncertainty_score":0.06084287},"labels":[],"label_agreement":null},{"id":"W2772581169","doi":"10.28989/senatik.v3i0.117","title":"RESPON PENUMPANG BANDAR UDARA INTERNASIONAL ADISUTJIPTO YOGYAKARTA TERHADAP PEMINDAHAN LOKASI BANDARA KE KULON PROGO","year":2017,"lang":"id","type":"article","venue":"Conference SENATIK STT Adisutjipto Yogyakarta","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fraser Institute","funders":"","keywords":"Physics; Humanities; Advertising; Business; Art","score_opus":0.030245214640816705,"score_gpt":0.26594633515773575,"score_spread":0.23570112051691905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772581169","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18584007,0.0045086383,0.00976003,0.008029764,0.0019710565,0.00040938277,0.0014120453,0.0011110796,0.78695786],"genre_scores_gemma":[0.2058938,0.0026456667,0.0042382856,0.000981361,0.0001584876,0.00012883292,0.0009319303,0.00037016426,0.7846515],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9985411,0.00028621053,0.00008284631,0.00021724425,0.0005361163,0.00033650015],"domain_scores_gemma":[0.9979843,0.0003278958,0.00016940766,0.00025108704,0.0006531312,0.0006141721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016432804,0.00070412713,0.00042388373,0.001005493,0.0027272215,0.0048124148,0.00077571726,0.0011009265,0.12987503],"category_scores_gemma":[0.0018158875,0.00046733403,0.00058165047,0.0012387442,0.0009893728,0.0018106299,0.0035930371,0.0016448182,0.04408397],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001048147,0.0010995428,0.055026438,0.0016437869,0.00008367278,0.0018715684,0.016798424,0.00094700995,0.03936459,0.022064792,0.1720802,0.6879718],"study_design_scores_gemma":[0.00003396817,0.00036061349,0.05039923,0.0003466614,0.00004937576,0.0011015767,0.01632487,0.00040354166,0.0073899226,0.0017652547,0.92176795,0.000057060224],"about_ca_topic_score_codex":0.009446721,"about_ca_topic_score_gemma":0.018730411,"teacher_disagreement_score":0.12987503,"about_ca_system_score_codex":0.0018016599,"about_ca_system_score_gemma":0.0036443607,"threshold_uncertainty_score":0.43447524},"labels":[],"label_agreement":null},{"id":"W2775986253","doi":"10.5539/ass.v14n1p112","title":"Public Participation and the Development of Transportation Infrastructure towards Sustainable Transportation and Regional Development in Medan, North Sumatra, Indonesia","year":2017,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Sustainable development; Business; Transportation infrastructure; Sustainable transport; Structural equation modeling; Public transport; Economic growth; Sustainability; Transport engineering; Political science; Economics; Engineering; Population; Environmental health","score_opus":0.018072495731286674,"score_gpt":0.23536180731887127,"score_spread":0.2172893115875846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775986253","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930749,0.00007677846,0.00012160468,0.0003541108,0.000004781291,0.000008101217,0.00003823809,0.0000033958179,0.0063180886],"genre_scores_gemma":[0.9990747,0.000071810915,0.000063518855,0.000011816982,0.0000015663074,0.000006853065,0.000019934665,5.996908e-7,0.00074918795],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996728,0.00013583168,0.0000145089,0.000031853426,0.00005285114,0.00009218158],"domain_scores_gemma":[0.9994605,0.00012206513,0.00017086582,0.00001875947,0.00006963617,0.00015826197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032393422,0.0001746532,0.00011271404,0.00042106444,0.00075225165,0.0011697058,0.00030451312,0.0001932913,0.0030947586],"category_scores_gemma":[0.0007811092,0.00010047084,0.00017028252,0.0005905165,0.0005185004,0.00051940634,0.0013624668,0.00039791485,0.00016182238],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118918004,0.0006722765,0.9031376,0.00025770793,0.00008836132,0.0020706123,0.027149763,0.0018251125,0.0017670057,0.0062332326,0.0021932852,0.05448599],"study_design_scores_gemma":[0.000007733311,0.000078193705,0.91676843,0.000096544914,0.000042838277,0.00027575495,0.07133887,0.0019166562,0.0003808036,0.00070798525,0.008373318,0.0000130418075],"about_ca_topic_score_codex":0.016753726,"about_ca_topic_score_gemma":0.035661377,"teacher_disagreement_score":0.016753726,"about_ca_system_score_codex":0.0012728956,"about_ca_system_score_gemma":0.0016446366,"threshold_uncertainty_score":0.03331244},"labels":[],"label_agreement":null},{"id":"W27855565","doi":"10.1080/15622975.2016.1262061","title":"ANALISIS PREREFERENSI KONSUMEN DALAM PEMILIHAN JASA TRANSPORTASI DENGAN MENGGUNAKAN KONJOIN ANALISIS","year":2012,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Institutes of Health Research","keywords":"Humanities; Physics; Art","score_opus":0.009356406140002273,"score_gpt":0.1783298281991246,"score_spread":0.16897342205912233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W27855565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90889794,0.002582367,0.019350907,0.002483362,0.00056903274,0.0005931728,0.014493325,0.00030756177,0.050722335],"genre_scores_gemma":[0.9402479,0.0012621594,0.012824892,0.00048489042,0.00014988935,0.00039197056,0.0065807602,0.00017338472,0.037884146],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9949981,0.0015798081,0.0006700268,0.0006431726,0.001628982,0.0004798909],"domain_scores_gemma":[0.9822503,0.009194489,0.001940395,0.0017000423,0.0043636854,0.0005510849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054999734,0.0004383869,0.0004892556,0.0037555208,0.0011221573,0.0021788327,0.0006105304,0.00048754213,0.018731674],"category_scores_gemma":[0.016874554,0.00020869338,0.00069082086,0.005793409,0.00045482916,0.0010335161,0.0012368838,0.0010361949,0.0028058926],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007895504,0.00026836034,0.6476466,0.0016615435,0.0006783469,0.0016349602,0.017003162,0.0015038621,0.0059057297,0.00996583,0.019047784,0.29389417],"study_design_scores_gemma":[0.000022851746,0.00029427794,0.7970205,0.000638896,0.0005663728,0.0010683334,0.041850187,0.0019162486,0.008371602,0.004591104,0.14356075,0.0000990012],"about_ca_topic_score_codex":0.012707851,"about_ca_topic_score_gemma":0.01593084,"teacher_disagreement_score":0.018731674,"about_ca_system_score_codex":0.0012064346,"about_ca_system_score_gemma":0.0023016373,"threshold_uncertainty_score":0.062663734},"labels":[],"label_agreement":null},{"id":"W2795108748","doi":"10.29313/jmtm.v16i2.3665","title":"Efektifitas Load Balancing Dalam Mengatasi Kemacetan Lalu Lintas","year":2017,"lang":"id","type":"article","venue":"Matematika","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Computer science","score_opus":0.015635541834066825,"score_gpt":0.23533288807741543,"score_spread":0.2196973462433486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795108748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25733835,0.005521319,0.5578827,0.0025433283,0.001777371,0.0006961204,0.0018930051,0.022221083,0.15012674],"genre_scores_gemma":[0.87177336,0.0019428215,0.078710094,0.00053125387,0.00016259398,0.0003528246,0.001300438,0.0013429249,0.043883637],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937016,0.00008870881,0.000041613283,0.00009043395,0.00033305536,0.00007603124],"domain_scores_gemma":[0.99901044,0.0003633568,0.00007249492,0.00013043339,0.0003548483,0.00006835488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006520492,0.0010858239,0.0006470664,0.0006466028,0.00073922094,0.0021281394,0.0010721668,0.00079072564,0.029279537],"category_scores_gemma":[0.0021999048,0.0003050376,0.0005874862,0.00058207475,0.0004447478,0.0015170107,0.0011932577,0.000962616,0.005672842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029318691,0.00048628697,0.0055911327,0.002426781,0.00019216623,0.00078813627,0.0010431673,0.13935398,0.23164144,0.017222743,0.03268759,0.56563467],"study_design_scores_gemma":[0.00030789137,0.002092234,0.009169358,0.00043285813,0.0004303711,0.0010304905,0.0011735451,0.5313222,0.2388912,0.017118892,0.19780436,0.00022663937],"about_ca_topic_score_codex":0.0026254535,"about_ca_topic_score_gemma":0.0032874595,"teacher_disagreement_score":0.029279537,"about_ca_system_score_codex":0.00076077244,"about_ca_system_score_gemma":0.0008358104,"threshold_uncertainty_score":0.0979498},"labels":[],"label_agreement":null},{"id":"W2805817098","doi":"10.24815/jts.v7i1.7092","title":"MOTORISTS’ CHANGE BEHAVIOURAL ANALYSIS ON SCHOOL SAFETY ZONE PROJECT (CASE STUDY: SMP NEGERI 9 KOTA LANGSA, ACEH)","year":2018,"lang":"en","type":"article","venue":"Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Transport engineering; Engineering; Geography","score_opus":0.044536618915426776,"score_gpt":0.27203076597833076,"score_spread":0.227494147062904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805817098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99854654,0.000013956014,0.000062041836,0.000050851606,0.000002020729,0.000029240358,0.00009819128,0.0000033319748,0.0011938409],"genre_scores_gemma":[0.9954751,0.000080110265,0.00032559782,0.000027468583,0.0000032689427,0.00006511633,0.00023195049,0.0000028340405,0.0037885231],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995191,0.00012338493,0.00001699995,0.000081217695,0.00009609392,0.00016327867],"domain_scores_gemma":[0.9995926,0.000052288728,0.00007294521,0.000024625499,0.00013449894,0.00012300907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051214534,0.00026338996,0.00023037533,0.0007492351,0.0015991635,0.0004906134,0.0004729015,0.000542926,0.0038840668],"category_scores_gemma":[0.00061914726,0.00020187347,0.000311058,0.00059021404,0.0004900414,0.0003647286,0.0009370266,0.000544713,0.0004926123],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002855353,0.0031503877,0.8785505,0.00029162745,0.00007674049,0.008624106,0.057394035,0.00082814664,0.0039924835,0.00051132863,0.0040331613,0.042261913],"study_design_scores_gemma":[0.000013707537,0.000819669,0.90696794,0.000043875243,0.000025686883,0.0006029324,0.08507333,0.0007076556,0.0010638984,0.00006977625,0.0045905747,0.000020953228],"about_ca_topic_score_codex":0.032904092,"about_ca_topic_score_gemma":0.08539965,"teacher_disagreement_score":0.032904092,"about_ca_system_score_codex":0.0013362659,"about_ca_system_score_gemma":0.0012155459,"threshold_uncertainty_score":0.06542516},"labels":[],"label_agreement":null},{"id":"W2892443955","doi":"10.5539/jsd.v11n5p277","title":"The Problem of Transportation Infrastructure Development in Papua Region Indonesia","year":2018,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Population; Equity (law); Context (archaeology); The Republic; Economic growth; Public infrastructure; Geography; Unitary state; Business; Economy; Political science; Economics; Sociology","score_opus":0.004535827768039379,"score_gpt":0.18035208760360413,"score_spread":0.17581625983556476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2892443955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65324205,0.015890153,0.009329952,0.09007314,0.00060541165,0.00033330527,0.0010499855,0.000107011736,0.22936897],"genre_scores_gemma":[0.978208,0.006536314,0.0029156404,0.0008039986,0.000100996425,0.000119395394,0.00014274626,0.000012362657,0.01116048],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99935466,0.000209228,0.00003671882,0.00008749696,0.0000820218,0.00023000313],"domain_scores_gemma":[0.9989077,0.00046051564,0.0002010392,0.00003366161,0.00019742959,0.00019973033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007148556,0.00029443987,0.0002721811,0.0009226416,0.0020371305,0.00397401,0.0011416097,0.0010439727,0.0037762295],"category_scores_gemma":[0.00265661,0.00034445972,0.00024844604,0.0016736502,0.0015487721,0.002422485,0.0021531598,0.0018042318,0.00020147274],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013330388,0.0003567922,0.10458525,0.0013673715,0.00013413827,0.039319955,0.014949131,0.04818922,0.0013459992,0.53559846,0.048195865,0.20582454],"study_design_scores_gemma":[0.00009094472,0.00028893325,0.12620713,0.0030997111,0.0001605067,0.018782228,0.115820795,0.0948543,0.0016596273,0.25567806,0.38312158,0.00023625852],"about_ca_topic_score_codex":0.073999636,"about_ca_topic_score_gemma":0.034233768,"teacher_disagreement_score":0.073999636,"about_ca_system_score_codex":0.004428296,"about_ca_system_score_gemma":0.006921295,"threshold_uncertainty_score":0.14713782},"labels":[],"label_agreement":null},{"id":"W2899650247","doi":"10.1155/2018/9370597","title":"Airworthiness Support Measures Analogy to the Prospective Roundabouts Alternatives: Theoretical Aspects","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mathematical model; Correctness; Operations research; Computer science; Analogy; Parametric statistics; Traffic flow (computer networking); Engineering; Management science; Mathematics","score_opus":0.005795905268636316,"score_gpt":0.2327310445312982,"score_spread":0.22693513926266187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899650247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06258594,0.0012489697,0.8773646,0.0010576074,0.00005725668,0.000075681586,0.00012414886,0.000062278035,0.057423588],"genre_scores_gemma":[0.92532676,0.0011291297,0.066177495,0.000064161606,0.000053200518,0.00014502114,0.00006816056,0.000019757334,0.0070163235],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993783,0.00026567254,0.00002119467,0.00009623243,0.0001905842,0.000047920053],"domain_scores_gemma":[0.99930525,0.00035520425,0.0001193778,0.00006601905,0.00012439482,0.00002983651],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081834325,0.0004870758,0.0002735057,0.00079660356,0.00032921924,0.0019434615,0.0010835098,0.0005916773,0.00497187],"category_scores_gemma":[0.0024437192,0.00024576634,0.00070797524,0.00063949276,0.001455855,0.0020265528,0.00081434456,0.0010299942,0.00030171892],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009539525,0.000026970476,0.0006921256,0.000092297145,0.000011957991,0.000064315675,0.0001457108,0.1311428,0.00045049502,0.8562068,0.00030351974,0.010853462],"study_design_scores_gemma":[0.000010150416,0.00007475001,0.00078073604,0.00008627426,0.00002186683,0.00010782267,0.00025755152,0.58488774,0.0007044684,0.40485853,0.00819012,0.000019980866],"about_ca_topic_score_codex":0.0020260822,"about_ca_topic_score_gemma":0.0015066549,"teacher_disagreement_score":0.00497187,"about_ca_system_score_codex":0.0015375086,"about_ca_system_score_gemma":0.0009126768,"threshold_uncertainty_score":0.016632557},"labels":[],"label_agreement":null},{"id":"W2909057070","doi":"10.30659/jpsa.v14i1.3856","title":"DAMPAK TERMINAL MANGKANG KOTA SEMARANG DAN PERMASALAHAN DI KAWASAN SEKITARNYA STUDI KASUS : TERMINAL MANGKANG SEMARANG","year":2019,"lang":"en","type":"article","venue":"Jurnal Planologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Terminal (telecommunication); Transport engineering; Computer science; Operations research; Telecommunications; Engineering","score_opus":0.00801709149894173,"score_gpt":0.19961320490507092,"score_spread":0.1915961134061292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909057070","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9940012,0.00012965157,0.0001533212,0.00007244039,0.0000072789103,0.000014559243,0.00003842187,0.0000044453222,0.0055787256],"genre_scores_gemma":[0.99612916,0.00028876442,0.00032121723,0.000018862083,0.0000025112463,0.000018310951,0.00007063645,0.000002728239,0.003147797],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998634,0.000028724196,0.000006629014,0.000026664682,0.000029350402,0.000045262397],"domain_scores_gemma":[0.99980694,0.000058398015,0.00003814781,0.000011168195,0.000037747697,0.000047594895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019597026,0.00025292308,0.00020294031,0.0003060776,0.0011582562,0.0010828782,0.00020037308,0.00026560406,0.0058797365],"category_scores_gemma":[0.00039366825,0.000100697005,0.00022687501,0.000577525,0.00047900103,0.0006461404,0.0007653291,0.00040709414,0.0005265659],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041853654,0.0012023777,0.72689915,0.001177509,0.00013286894,0.00784639,0.0864501,0.0026205776,0.015361437,0.009498524,0.0051021483,0.14329046],"study_design_scores_gemma":[0.000015241992,0.0006391073,0.7380567,0.00024524372,0.00012207247,0.0014171754,0.21727546,0.00091246486,0.003719283,0.0012641251,0.03629842,0.000034743505],"about_ca_topic_score_codex":0.00404604,"about_ca_topic_score_gemma":0.01563222,"teacher_disagreement_score":0.0058797365,"about_ca_system_score_codex":0.0007552998,"about_ca_system_score_gemma":0.0010484628,"threshold_uncertainty_score":0.019669652},"labels":[],"label_agreement":null},{"id":"W2909479857","doi":"10.30659/jpsa.v14i1.3858","title":"DAMPAK GUNA LAHAN TERHADAP TINGKAT KEMAMPUAN KINERJA JALAN STUDI KASUS : JALAN AHMAD YANI DI KECAMATAN KARTASURA","year":2019,"lang":"en","type":"article","venue":"Jurnal Planologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business; Traffic congestion; Transport engineering; Geography; Agricultural economics; Engineering; Economics","score_opus":0.007044193372313369,"score_gpt":0.18067344891037626,"score_spread":0.17362925553806288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909479857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75299335,0.02364324,0.0008640626,0.0078078075,0.0009598118,0.00021909266,0.0006976795,0.000087251494,0.21272776],"genre_scores_gemma":[0.8534255,0.030214056,0.0012724752,0.0007468425,0.00016570625,0.00013057562,0.00040432796,0.00003751304,0.11360295],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998217,0.000029332896,0.000012142335,0.000028675322,0.000064692365,0.000043476324],"domain_scores_gemma":[0.9998053,0.000046756533,0.000029620405,0.000011175133,0.00006632337,0.00004087811],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041432996,0.0003838732,0.00031531753,0.000570667,0.0022558018,0.0020766577,0.0003566174,0.00045649882,0.020045666],"category_scores_gemma":[0.0005584621,0.00020119686,0.00021497154,0.00071481033,0.00040460582,0.0011643459,0.000981205,0.00080318924,0.004496618],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004757134,0.001982266,0.22770464,0.0039535826,0.00011308618,0.014218224,0.11170727,0.0013261522,0.017801445,0.05609641,0.12814835,0.43647286],"study_design_scores_gemma":[0.000019155415,0.00033353997,0.210886,0.0017956183,0.00009273741,0.004748523,0.14074384,0.0007889246,0.005258903,0.0022298347,0.6330178,0.00008512547],"about_ca_topic_score_codex":0.0063746907,"about_ca_topic_score_gemma":0.013354376,"teacher_disagreement_score":0.020045666,"about_ca_system_score_codex":0.00084332266,"about_ca_system_score_gemma":0.0023898669,"threshold_uncertainty_score":0.06705946},"labels":[],"label_agreement":null},{"id":"W2910011478","doi":"10.30659/jpsa.v14i1.3861","title":"TINGKAT PELAYANAN RUAS JALAN TEUKU UMAR DAN JALAN SETIABUDI KOTA SEMARANG DI TINJAU DARI ASPEK PERMASALAHAN KEMACETAN LALU LINTAS","year":2019,"lang":"en","type":"article","venue":"Jurnal Planologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada); WiLAN (Canada)","funders":"","keywords":"Transport engineering; Level of service; Service (business); Traffic congestion; Traffic flow (computer networking); Computer science; Service level; Traffic volume; Business; Mathematics; Computer network; Statistics; Engineering","score_opus":0.005328565723473565,"score_gpt":0.17763997030558032,"score_spread":0.17231140458210675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910011478","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6409752,0.00757407,0.015162206,0.0052700792,0.0009032234,0.0005938,0.0010005637,0.0006710737,0.3278499],"genre_scores_gemma":[0.8922083,0.0063952026,0.014155501,0.0007286433,0.00011138677,0.000376767,0.0007371648,0.00012364327,0.08516348],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99966216,0.000057021578,0.000028975364,0.00006755889,0.000107534426,0.000076827215],"domain_scores_gemma":[0.99959785,0.00009816978,0.00007412357,0.000033256125,0.00013289618,0.00006372058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005006123,0.0005992582,0.00042102853,0.00083240576,0.0022392194,0.0036030244,0.0005470307,0.0006660104,0.017260725],"category_scores_gemma":[0.0006995741,0.00033085662,0.00041066474,0.0011768528,0.00082838105,0.0017856013,0.0013100043,0.0014928373,0.002708749],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010101622,0.001631617,0.09888553,0.00402574,0.0001514406,0.009631436,0.028317219,0.0050342632,0.04412464,0.08461666,0.03756203,0.6850093],"study_design_scores_gemma":[0.00012056612,0.00118036,0.1880904,0.001980098,0.00030715263,0.010037744,0.07673832,0.006843894,0.030632077,0.01487382,0.6688991,0.00029638695],"about_ca_topic_score_codex":0.003169195,"about_ca_topic_score_gemma":0.007889457,"teacher_disagreement_score":0.017260725,"about_ca_system_score_codex":0.0017833131,"about_ca_system_score_gemma":0.0026762292,"threshold_uncertainty_score":0.057742894},"labels":[],"label_agreement":null},{"id":"W2910398785","doi":"10.24843/ejmunud.2018.v07.i12.p13","title":"PENERAPAN NETWORK PLANNING PADA PROYEK PEMBANGUNAN PERUMAHAN MUTIARA RESIDENCE DI DESA PENGAMBENGAN KABUPATEN JEMBRANA","year":2018,"lang":"en","type":"article","venue":"E-Jurnal Manajemen Universitas Udayana","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Critical path method; Gantt chart; Residence; Computer science; Operations management; Chart; Operations research; Mathematics; Engineering; Statistics; Economics; Systems engineering","score_opus":0.012897853157193525,"score_gpt":0.2001500539178765,"score_spread":0.18725220076068297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910398785","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39950868,0.0022563979,0.47513476,0.00148682,0.00017492677,0.00097604893,0.0012377023,0.00079880754,0.118425846],"genre_scores_gemma":[0.8356846,0.0016420267,0.13746206,0.000047587033,0.000014350191,0.00043672734,0.0006604245,0.000102430524,0.023949888],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99971586,0.00010568138,0.00001347701,0.00005641293,0.0000616494,0.000046924328],"domain_scores_gemma":[0.99956805,0.00021438178,0.000044914024,0.000020734084,0.000116385294,0.000035475474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004779472,0.0005465397,0.00027299428,0.0011259484,0.00076040934,0.0015149127,0.00043484662,0.0003441932,0.010018043],"category_scores_gemma":[0.0010523018,0.0002657877,0.00031900554,0.0011823035,0.00035228208,0.00138952,0.0006862286,0.0005618401,0.0006024503],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033380016,0.00035336573,0.024932567,0.00089503854,0.00007115198,0.0014339271,0.0009819624,0.4699721,0.0060027274,0.059720818,0.009605818,0.42569676],"study_design_scores_gemma":[0.00004549333,0.000494089,0.01914683,0.0003900757,0.00011472493,0.0008610826,0.005753293,0.85150546,0.012344395,0.03548834,0.07377299,0.00008315621],"about_ca_topic_score_codex":0.010111924,"about_ca_topic_score_gemma":0.01820845,"teacher_disagreement_score":0.010111924,"about_ca_system_score_codex":0.0012096968,"about_ca_system_score_gemma":0.0026607278,"threshold_uncertainty_score":0.033513725},"labels":[],"label_agreement":null},{"id":"W2911132498","doi":"10.30659/jpsa.v14i1.3859","title":"FAKTOR-FAKTOR PENDORONG PENYEBAB TERJADINYA KEMACETAN STUDI KASUS : KAWASAN SUKUN BANYUMANIK KOTA SEMARANG","year":2019,"lang":"en","type":"article","venue":"Jurnal Planologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transport engineering; Traffic congestion; Highway Capacity Manual; Computer science; Advertising; Business; Level of service; Engineering","score_opus":0.004540036861959075,"score_gpt":0.16318026687296813,"score_spread":0.15864023001100905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911132498","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8253923,0.026274115,0.0007826025,0.011779585,0.0030657023,0.00039629894,0.0069289133,0.00026162007,0.12511884],"genre_scores_gemma":[0.89581865,0.02467803,0.0011333071,0.00093890505,0.00034057922,0.00035084318,0.0023172905,0.000078489575,0.07434398],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99967897,0.000062446175,0.000042167172,0.00006955912,0.000090482674,0.000056458746],"domain_scores_gemma":[0.9992729,0.0002519494,0.00012674491,0.000051845785,0.00015861815,0.00013788251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006839979,0.000406527,0.0005919272,0.00075859594,0.0012250177,0.0019719752,0.00029649513,0.00050661707,0.0513034],"category_scores_gemma":[0.0016200683,0.00022798569,0.00012225664,0.00090289087,0.00038551542,0.00064034236,0.0012774889,0.0005384345,0.011769294],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000831088,0.0010109774,0.23815042,0.006970093,0.00014078105,0.012335,0.03744235,0.0008196512,0.00947932,0.022802144,0.31406042,0.35595778],"study_design_scores_gemma":[0.000057493005,0.0001869909,0.27563027,0.0020831595,0.00006565638,0.00709019,0.03809523,0.00068165926,0.0037902456,0.0012963449,0.6709427,0.0000800764],"about_ca_topic_score_codex":0.0024331734,"about_ca_topic_score_gemma":0.0026737433,"teacher_disagreement_score":0.0513034,"about_ca_system_score_codex":0.0006637479,"about_ca_system_score_gemma":0.0019569658,"threshold_uncertainty_score":0.17162699},"labels":[],"label_agreement":null},{"id":"W2929311486","doi":"10.26760/rekaracana.v4i4.1","title":"Bus Sekolah sebagai Pilihan Moda Transportasi di Kota Bandung dari Sisi Preferensi Pelajar sebagai Pengguna (Hal. 1-11)","year":2018,"lang":"id","type":"article","venue":"RekaRacana Jurnal Teknil Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Mathematics; Art","score_opus":0.013746730618824206,"score_gpt":0.21359039062689766,"score_spread":0.19984366000807346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929311486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49007952,0.03634563,0.04706743,0.009165476,0.0023577716,0.0013934746,0.0051730527,0.002552995,0.40586463],"genre_scores_gemma":[0.5741956,0.02082734,0.034540392,0.0016048824,0.0002833233,0.0005280818,0.0025363413,0.0006343203,0.36484972],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99918574,0.00012899851,0.00005949568,0.00013238598,0.00033188553,0.00016163134],"domain_scores_gemma":[0.9994035,0.00012215145,0.00011559387,0.00004271805,0.00022612291,0.00008997886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006201412,0.0009418726,0.0006667938,0.0010671085,0.0014137755,0.0031710484,0.00078292005,0.001290155,0.048990965],"category_scores_gemma":[0.00090355397,0.00047409986,0.0008123338,0.0010091291,0.00073331286,0.0016237042,0.002148151,0.001565903,0.014355654],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025255447,0.0009955665,0.036635038,0.0062544257,0.0002317685,0.0034021107,0.004410065,0.0013448816,0.22276087,0.017175606,0.03457141,0.6696928],"study_design_scores_gemma":[0.000100897996,0.0023481343,0.077961646,0.0016453766,0.0003536009,0.0045009474,0.010663306,0.0018535987,0.09004256,0.006294334,0.8040303,0.0002053856],"about_ca_topic_score_codex":0.0062796846,"about_ca_topic_score_gemma":0.011170944,"teacher_disagreement_score":0.048990965,"about_ca_system_score_codex":0.0012399064,"about_ca_system_score_gemma":0.0015263923,"threshold_uncertainty_score":0.16389108},"labels":[],"label_agreement":null},{"id":"W2940936584","doi":"","title":"SIMULASI ANTRIAN PELAYANAN PADA GARDU TOL BINJAI","year":2019,"lang":"en","type":"article","venue":"OSF Preprints (OSF Preprints)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Toll; Transport engineering; Service (business); Computer science; Engineering; Business; Marketing","score_opus":0.006543020932709964,"score_gpt":0.19888811247354005,"score_spread":0.19234509154083007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940936584","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21100895,0.0070552193,0.3733264,0.005348529,0.002483635,0.00024287833,0.0081024,0.0027800885,0.38965192],"genre_scores_gemma":[0.8625251,0.0029654445,0.04889932,0.00025985783,0.00020646074,0.00024210419,0.00238111,0.00047988276,0.08204065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998964,0.000026492513,0.0000047185176,0.000021579548,0.000028656523,0.000022183824],"domain_scores_gemma":[0.9996675,0.0001608314,0.000026099475,0.00003253204,0.00009183161,0.00002109669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022540217,0.00048691378,0.00048006338,0.0004005141,0.00042197335,0.0012108963,0.0006027386,0.00078037044,0.02410494],"category_scores_gemma":[0.0013397965,0.00018828672,0.00054658717,0.00028823302,0.0003728434,0.0007578362,0.0009019996,0.0007029096,0.0030706308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014655577,0.000120441786,0.004717252,0.00035544872,0.00005746546,0.00049286615,0.00022271114,0.80344874,0.003216936,0.13909812,0.01911614,0.029007345],"study_design_scores_gemma":[0.00003363547,0.000038038776,0.0010719876,0.000078106874,0.000023991395,0.00018022693,0.00010835981,0.9366259,0.0010678383,0.027979486,0.032774784,0.000017588609],"about_ca_topic_score_codex":0.021982092,"about_ca_topic_score_gemma":0.011214314,"teacher_disagreement_score":0.02410494,"about_ca_system_score_codex":0.00065302715,"about_ca_system_score_gemma":0.0008289262,"threshold_uncertainty_score":0.080639124},"labels":[],"label_agreement":null},{"id":"W2945098452","doi":"10.25104/warlit.v23i5.1102","title":"Analisis Kinerja Fasilitas Pejalan Kaki di Pusat Perbelanjaan Kota Padang","year":2019,"lang":"en","type":"article","venue":"Warta Penelitian Perhubungan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Pedestrian; Transport engineering; Perception; Business; Engineering; Psychology","score_opus":0.0033799936382578975,"score_gpt":0.16155575275369652,"score_spread":0.15817575911543863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945098452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.922727,0.0032566893,0.0021601233,0.0005654217,0.00011597519,0.00016589928,0.0029558856,0.0001404162,0.0679127],"genre_scores_gemma":[0.9651491,0.0016210091,0.004501035,0.00013109548,0.000021980202,0.00011167504,0.0015099176,0.000053413194,0.026900852],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994892,0.0000659977,0.000050091803,0.0000847825,0.0002144215,0.00009552364],"domain_scores_gemma":[0.99935967,0.00015401783,0.00013354453,0.000031434665,0.00025453814,0.00006669567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042057884,0.00038306147,0.0003164731,0.0021594162,0.001109437,0.0014869274,0.00045662356,0.0003151297,0.018584885],"category_scores_gemma":[0.0011652658,0.00025278228,0.00032892087,0.0022499627,0.0004406573,0.0008234631,0.0007939023,0.00055701775,0.002669242],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052175607,0.00036647424,0.5558477,0.002169624,0.0002029808,0.0033171116,0.027175136,0.0007788814,0.019151403,0.0075154514,0.01659189,0.36636168],"study_design_scores_gemma":[0.000011359004,0.0002059057,0.85368305,0.0005906421,0.00014223251,0.0029163978,0.042589445,0.0010112383,0.003689806,0.0008216755,0.09427592,0.00006232468],"about_ca_topic_score_codex":0.008201249,"about_ca_topic_score_gemma":0.02719544,"teacher_disagreement_score":0.018584885,"about_ca_system_score_codex":0.0005720728,"about_ca_system_score_gemma":0.00085531286,"threshold_uncertainty_score":0.06217259},"labels":[],"label_agreement":null},{"id":"W2946197766","doi":"10.25104/warlit.v23i2.1058","title":"Kajian Evaluasi Pelayanan Penumpang Kapal Laut di Pelabuhan Tanjung Pinang","year":2019,"lang":"en","type":"article","venue":"Warta Penelitian Perhubungan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Sample (material); Christian ministry; Scale (ratio); Variable (mathematics); Port (circuit theory); Transport engineering; Sampling (signal processing); Computer science; Operations research; Business; Geography; Mathematics; Engineering; Telecommunications","score_opus":0.0038834130642839875,"score_gpt":0.17274082057699186,"score_spread":0.16885740751270786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946197766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75838584,0.0050466773,0.0036137232,0.0035569607,0.00052801584,0.00026882812,0.00050709007,0.00020982718,0.22788315],"genre_scores_gemma":[0.89754295,0.0048318687,0.0050400915,0.00048937736,0.0000630024,0.00014767668,0.00059807464,0.00004236596,0.091244556],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998288,0.000030505294,0.000009392175,0.00002941462,0.00005830113,0.000043594544],"domain_scores_gemma":[0.999642,0.000049490434,0.000036829344,0.000015987633,0.00015613656,0.000099585566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043160023,0.0004969273,0.00020094935,0.0005344931,0.0018502655,0.0016015177,0.0003358137,0.00026039738,0.022733357],"category_scores_gemma":[0.00060905586,0.00022642681,0.00014954123,0.00071520556,0.0004490823,0.0011853368,0.0009197767,0.00059803517,0.0018709939],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045484139,0.0012030691,0.15745598,0.0022461754,0.00007978487,0.0048995866,0.03023394,0.0009275455,0.029114464,0.017109277,0.05175977,0.7045156],"study_design_scores_gemma":[0.000041222855,0.0005460659,0.34410867,0.0007173932,0.00015145219,0.0027739464,0.04961072,0.0018912604,0.009015705,0.0037406092,0.5873059,0.00009700023],"about_ca_topic_score_codex":0.0039540697,"about_ca_topic_score_gemma":0.014532342,"teacher_disagreement_score":0.022733357,"about_ca_system_score_codex":0.0007704062,"about_ca_system_score_gemma":0.0016872712,"threshold_uncertainty_score":0.07605064},"labels":[],"label_agreement":null},{"id":"W2950584742","doi":"10.25104/warlit.v22i1.996","title":"Evaluasi Kinerja Dalam Pelayanan Kereta Rel Listrik Eksekutif Jabodetabek","year":2010,"lang":"en","type":"article","venue":"Warta Penelitian Perhubungan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Ticket; Service (business); Computer science; Train; Class (philosophy); Transport engineering; Computer network; Business; Engineering","score_opus":0.0028704082733975135,"score_gpt":0.17039909084577265,"score_spread":0.16752868257237513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950584742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9829032,0.00048171598,0.0010544491,0.00008250959,0.000012957546,0.000063080544,0.00065410894,0.000015881247,0.014732055],"genre_scores_gemma":[0.98802173,0.00045038035,0.0017171911,0.00001770474,0.0000034680916,0.000051240484,0.0006307771,0.000008053417,0.009099434],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99982053,0.000033343476,0.000014171816,0.000030036144,0.000049463928,0.000052524232],"domain_scores_gemma":[0.99981874,0.000054921125,0.000024164987,0.000008486187,0.00007422457,0.000019424426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037112192,0.00030910125,0.0002794288,0.00084032345,0.00055451505,0.00138127,0.00020054472,0.00017991097,0.007827656],"category_scores_gemma":[0.0005337834,0.00012140439,0.00022064275,0.0009671735,0.000327362,0.00052428595,0.00045303477,0.00029003667,0.0007154547],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001000421,0.0007010446,0.6183905,0.001150681,0.00018785408,0.0012246508,0.014608245,0.008228501,0.01767793,0.007215265,0.004973413,0.32464162],"study_design_scores_gemma":[0.000021998894,0.00057704095,0.9120708,0.00022505951,0.00013606646,0.0002968466,0.0467553,0.006821075,0.006814099,0.00073015806,0.025516288,0.000035126115],"about_ca_topic_score_codex":0.029351175,"about_ca_topic_score_gemma":0.07669658,"teacher_disagreement_score":0.029351175,"about_ca_system_score_codex":0.001705842,"about_ca_system_score_gemma":0.0012476636,"threshold_uncertainty_score":0.058360636},"labels":[],"label_agreement":null},{"id":"W2954111909","doi":"10.20961/mateksi.v7i1.36531","title":"STUDI GELOMBANG KEJUT PADA SIMPANG BERSINYAL DENGAN MENGGUNAKAN EMP ATAS DASAR ANALISIS HEADWAY (Studi Kasus Pada Simpang Bersinyal Jalan Raya Wonogiri-Sukoharjo – Jalan Gedongan – Jalan Ciu Karangwuni)","year":2019,"lang":"id","type":"article","venue":"Matriks Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics","score_opus":0.008942610478131602,"score_gpt":0.20926860213075796,"score_spread":0.20032599165262635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954111909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7858335,0.035531256,0.0032937373,0.007200749,0.0010542629,0.0018893123,0.01710431,0.0002377392,0.14785516],"genre_scores_gemma":[0.86034375,0.013707177,0.002810291,0.00231996,0.00015556897,0.002923216,0.003965325,0.00013962864,0.11363508],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99878687,0.00039122897,0.00012047069,0.00021946429,0.00029706684,0.00018493898],"domain_scores_gemma":[0.9959282,0.0019299674,0.00062281964,0.00023478184,0.0008657329,0.00041842094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025707555,0.00033488113,0.0005729765,0.0006561036,0.0010732133,0.0018628716,0.00046709826,0.0006262336,0.048196975],"category_scores_gemma":[0.0063765547,0.00035978793,0.00070318894,0.0009011003,0.00038496603,0.0017390754,0.0012552704,0.0011199227,0.0078091654],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0054598334,0.0013954245,0.3476402,0.014311095,0.0014824312,0.00078968314,0.03456307,0.00027594867,0.0029913737,0.005236616,0.1190144,0.46684006],"study_design_scores_gemma":[0.0003903902,0.0018526213,0.7758661,0.006333219,0.0013361402,0.00062826386,0.031718813,0.0001668051,0.0028051487,0.002064096,0.17676711,0.00007146671],"about_ca_topic_score_codex":0.006384169,"about_ca_topic_score_gemma":0.015807506,"teacher_disagreement_score":0.048196975,"about_ca_system_score_codex":0.0011285197,"about_ca_system_score_gemma":0.0026751552,"threshold_uncertainty_score":0.16123492},"labels":[],"label_agreement":null},{"id":"W2955556268","doi":"10.25104/jptd.v15i4.1201","title":"BIAYA BBM AKIBAT KEMACETAN DI PERSIMPANGAN WILAYAH JABODETABEK FUEL COSTS BECAUSE OF CONGESTION IN THE INTERSECTION OF JABODETABEK","year":2019,"lang":"id","type":"article","venue":"Jurnal Penelitian Transportasi Darat","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Animal science; Biology","score_opus":0.009256867451370885,"score_gpt":0.21170735243858968,"score_spread":0.2024504849872188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955556268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9548167,0.0008744639,0.0010458309,0.0006136668,0.0000813728,0.0001064868,0.0015022419,0.000043074564,0.040916134],"genre_scores_gemma":[0.96552557,0.00073043426,0.0012226728,0.00011237374,0.0000144105,0.00011118864,0.00097441446,0.000015730053,0.031293202],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99981743,0.000026947673,0.000008484702,0.000033910666,0.000037150458,0.000076063465],"domain_scores_gemma":[0.9998739,0.0000146494785,0.000024240226,0.000007890496,0.000040488107,0.000038885973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018553897,0.00030613274,0.00018806907,0.0005011769,0.001267947,0.0012939656,0.00037045794,0.0003659577,0.01688613],"category_scores_gemma":[0.00025079408,0.00019181718,0.00021458308,0.00078085996,0.00033016154,0.0006619658,0.001008613,0.00063440716,0.0012206208],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016551428,0.0006268242,0.66197735,0.0018407978,0.0002592806,0.0041873995,0.0117739225,0.0046051973,0.046655938,0.010586446,0.015644282,0.24018744],"study_design_scores_gemma":[0.000030736333,0.0003066605,0.89708793,0.00031607467,0.00008402786,0.0003347864,0.024947189,0.0011662343,0.00604932,0.0005322588,0.06911463,0.000030200134],"about_ca_topic_score_codex":0.061902463,"about_ca_topic_score_gemma":0.17142856,"teacher_disagreement_score":0.061902463,"about_ca_system_score_codex":0.0017267723,"about_ca_system_score_gemma":0.0017714485,"threshold_uncertainty_score":0.12308431},"labels":[],"label_agreement":null},{"id":"W2978002073","doi":"10.32832/astonjadro.v8i1.2287","title":"ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN TRANSIT ORIENTED DEVELOPMENT (TOD) GREEN WALK STATION BEKASI TIMUR","year":2019,"lang":"id","type":"article","venue":"ASTONJADRO","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics","score_opus":0.006601663255057997,"score_gpt":0.1962915956347544,"score_spread":0.1896899323796964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978002073","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77756566,0.0030961619,0.0045789517,0.004937584,0.00049603847,0.00081218284,0.012188567,0.00039544448,0.19592933],"genre_scores_gemma":[0.8556205,0.0034814521,0.008094317,0.0013486053,0.00008315813,0.0008648179,0.00588693,0.00025919036,0.124361016],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9969223,0.00057213404,0.00023570594,0.0003656563,0.0014669362,0.0004371828],"domain_scores_gemma":[0.99182874,0.0018212142,0.00096917496,0.00028169705,0.0045822626,0.00051699334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027008578,0.00051841687,0.00034346976,0.0027530799,0.0018775316,0.0030610396,0.00080955226,0.00058794377,0.024762288],"category_scores_gemma":[0.0077849696,0.00024918834,0.0005321025,0.003328258,0.0007225375,0.0019336324,0.0021209195,0.0016826934,0.005333989],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006087515,0.00049056206,0.40088618,0.0037816593,0.00019939826,0.0019531017,0.09185997,0.0006759537,0.008201027,0.010350073,0.06441928,0.41657394],"study_design_scores_gemma":[0.000015802703,0.0003245284,0.47233546,0.0013631284,0.00014057207,0.00055786356,0.23384027,0.00051947206,0.0042543868,0.0013382337,0.28523412,0.00007625189],"about_ca_topic_score_codex":0.031645477,"about_ca_topic_score_gemma":0.065132484,"teacher_disagreement_score":0.031645477,"about_ca_system_score_codex":0.0032209868,"about_ca_system_score_gemma":0.004420403,"threshold_uncertainty_score":0.08283818},"labels":[],"label_agreement":null},{"id":"W2981052658","doi":"10.17509/jaz.v2i3.17857","title":"PENERAPAN KONSEP INTEGRASI ANTAR TUANG PUBLIK PADA REDESAIN STASIUN KERETA API PATI","year":2019,"lang":"en","type":"article","venue":"Jurnal Arsitektur ZONASI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Indonesian; Public space; Transport engineering; Engineering; Geography; Civil engineering; Architectural engineering","score_opus":0.005070191235950853,"score_gpt":0.16707697211783862,"score_spread":0.16200678088188777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2981052658","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5858448,0.001435299,0.03010768,0.0022354908,0.0005499428,0.00090278854,0.00088515907,0.0013034381,0.37673536],"genre_scores_gemma":[0.85280335,0.0012596374,0.022293841,0.00031406898,0.000049684633,0.00057528465,0.0007014918,0.00029112663,0.121711455],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907744,0.00021294548,0.00008033448,0.000116553594,0.00037104083,0.00014167286],"domain_scores_gemma":[0.9988858,0.00018731589,0.00011664131,0.00014097833,0.0004935276,0.00017567808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011301469,0.0004934283,0.00023161796,0.0009699755,0.0016329483,0.003381393,0.0008312303,0.0004930008,0.02493755],"category_scores_gemma":[0.0014422664,0.00031307185,0.0003969727,0.001258863,0.0007616828,0.0017421494,0.0019939162,0.0011432737,0.004805696],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078968005,0.002084793,0.059090294,0.0029776318,0.00011153959,0.003766221,0.03546148,0.0038078064,0.026797345,0.044588234,0.02774664,0.79277843],"study_design_scores_gemma":[0.00007364501,0.0013389095,0.093685605,0.00095091696,0.00022846047,0.002354697,0.053771935,0.0039747604,0.017015452,0.0046805213,0.82179296,0.00013210945],"about_ca_topic_score_codex":0.0024835237,"about_ca_topic_score_gemma":0.006269252,"teacher_disagreement_score":0.02493755,"about_ca_system_score_codex":0.001223563,"about_ca_system_score_gemma":0.003490199,"threshold_uncertainty_score":0.08342439},"labels":[],"label_agreement":null},{"id":"W2987380301","doi":"","title":"STUDI PENENTUAN LOKASI DAN KEBUTUHAN FASILITAS STASIUN PADA RENCANA PEMBANGUNAN LIGHT RAIL TRANSIT KOTA MANADO","year":2019,"lang":"id","type":"article","venue":"Jurnal Mahasiswa Jurusan Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.007469308149550472,"score_gpt":0.19473117259399272,"score_spread":0.18726186444444226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2987380301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8102095,0.043074343,0.004236888,0.011291135,0.0008171681,0.0014789735,0.012056541,0.00014964509,0.11668575],"genre_scores_gemma":[0.87226915,0.02837159,0.00404793,0.0028399131,0.00014281417,0.0011251946,0.0032293014,0.00008772025,0.087886475],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99806195,0.0005261289,0.00018497153,0.00033711627,0.0005956759,0.00029410917],"domain_scores_gemma":[0.99613154,0.0014481861,0.0005387642,0.00024697106,0.0013381582,0.00029636302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002966946,0.0004385384,0.0006062704,0.0010371953,0.0012812928,0.0029307504,0.00077311,0.000839762,0.023331285],"category_scores_gemma":[0.005980469,0.0004029947,0.0012679773,0.0015709334,0.00060721155,0.0017787676,0.0010240644,0.001448489,0.003288336],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0041213944,0.0018343335,0.4507672,0.015818546,0.0016855925,0.0020462563,0.027977332,0.00094550685,0.009337703,0.013522365,0.039972603,0.4319712],"study_design_scores_gemma":[0.00028434666,0.0026093393,0.531126,0.006504497,0.002788275,0.0010876851,0.05775891,0.00051033305,0.0083719,0.0036554702,0.3851379,0.00016535903],"about_ca_topic_score_codex":0.04175002,"about_ca_topic_score_gemma":0.095522605,"teacher_disagreement_score":0.04175002,"about_ca_system_score_codex":0.002687,"about_ca_system_score_gemma":0.006385528,"threshold_uncertainty_score":0.08301401},"labels":[],"label_agreement":null},{"id":"W2996126953","doi":"10.5430/rwe.v10n3p315","title":"Infrastructure Enhancement and Households’ Economic Activities: Lesson From Indonesia","year":2019,"lang":"en","type":"article","venue":"Research in World Economy","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Negeri Malang","keywords":"Tourism; Business; Economic growth; Focus group; Plan (archaeology); Development plan; Socioeconomics; Geography; Marketing; Economics","score_opus":0.0196155378234308,"score_gpt":0.25528100781266494,"score_spread":0.23566546998923413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2996126953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76574606,0.0132292705,0.0019066705,0.07175133,0.0011542186,0.00014588164,0.00026228136,0.000080327125,0.14572403],"genre_scores_gemma":[0.94486606,0.022000056,0.0036686182,0.0040189554,0.00018873265,0.000060916118,0.00010018105,0.000031868447,0.025064556],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998884,0.000053980988,0.00000455045,0.00001126202,0.0000151083395,0.00002669354],"domain_scores_gemma":[0.9998692,0.000044170447,0.000012320921,0.000006091921,0.000021467358,0.00004676407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035733494,0.00040413998,0.00024239084,0.00018346136,0.001110926,0.0012254338,0.00035960393,0.0004505889,0.0025504427],"category_scores_gemma":[0.00042127483,0.000117020056,0.0002195291,0.00032274128,0.0006146421,0.001478761,0.0012442487,0.0014580577,0.00030567514],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015187687,0.0029558758,0.061396807,0.00266767,0.000048643786,0.009614182,0.17697518,0.0012452186,0.0039851214,0.020636342,0.09598644,0.6243367],"study_design_scores_gemma":[0.00003898786,0.00064473046,0.1216603,0.0034690232,0.000105816485,0.002261535,0.45392993,0.0012012274,0.0032296774,0.011457236,0.40193444,0.0000669962],"about_ca_topic_score_codex":0.008585088,"about_ca_topic_score_gemma":0.033794098,"teacher_disagreement_score":0.008585088,"about_ca_system_score_codex":0.0009208153,"about_ca_system_score_gemma":0.0013654272,"threshold_uncertainty_score":0.017070234},"labels":[],"label_agreement":null},{"id":"W2996778162","doi":"10.25105/psia.v1i1.5975","title":"STUDI LOKASI RAWAN KECELAKAAN LALU LINTAS DI JALANRAYA BOGOR SEKSI KEDUNG HALANG – PABUARAN","year":2019,"lang":"id","type":"article","venue":"Prosiding Seminar Intelektual Muda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.007961860937376698,"score_gpt":0.20783537593272006,"score_spread":0.19987351499534337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2996778162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92763376,0.001963833,0.0027450207,0.00053495425,0.00010238369,0.00014804893,0.005018409,0.00015592513,0.061697647],"genre_scores_gemma":[0.9485925,0.0012788837,0.0037136427,0.00010805456,0.000029532614,0.00015533333,0.0034161995,0.00009260563,0.04261318],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99948907,0.00008081149,0.000028396682,0.00014678412,0.00013773282,0.000117211915],"domain_scores_gemma":[0.99938786,0.00015158094,0.00007191177,0.000052457908,0.000269679,0.00006635153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048856565,0.00048075867,0.00043170294,0.0015503413,0.0014267124,0.0028542439,0.0005086399,0.0005126064,0.011284339],"category_scores_gemma":[0.00076675223,0.00031943587,0.0005106632,0.0023831415,0.00045481144,0.0013060278,0.0010451822,0.00076759665,0.0024799884],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012749549,0.0004994266,0.6364485,0.0017310157,0.00042571023,0.0032953452,0.02350761,0.0047616647,0.020348148,0.013930853,0.01785186,0.27592495],"study_design_scores_gemma":[0.000024331932,0.00041047926,0.74881774,0.00051399384,0.00031246815,0.00093881,0.0510108,0.0022930729,0.009554397,0.001670975,0.18434705,0.00010591499],"about_ca_topic_score_codex":0.032426942,"about_ca_topic_score_gemma":0.09331671,"teacher_disagreement_score":0.032426942,"about_ca_system_score_codex":0.0018373101,"about_ca_system_score_gemma":0.0020485811,"threshold_uncertainty_score":0.06447643},"labels":[],"label_agreement":null},{"id":"W3005562718","doi":"10.1155/2020/7645142","title":"Mass Rapid Transit Operation and Maintenance Cost Calculation Model","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Capital cost; Kilometer; Transit (satellite); Transport engineering; Total cost; Unit cost; Transit system; Capital city; Unit (ring theory); Cost analysis; Cost estimate; Operating cost; Environmental science; Operations management; Engineering; Reliability engineering; Business; Mathematics; Public transport; Economics; Waste management","score_opus":0.010781297367735485,"score_gpt":0.2037923506966562,"score_spread":0.1930110533289207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005562718","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23521858,0.0011597903,0.56909543,0.0013174602,0.00036605282,0.0014578965,0.019921454,0.002510752,0.16895263],"genre_scores_gemma":[0.8792822,0.00074623694,0.056747902,0.00008294104,0.00005138495,0.000922752,0.00669798,0.00020344029,0.05526523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965703,0.00005939321,0.00002563671,0.000065743414,0.00013384338,0.000058437283],"domain_scores_gemma":[0.99953914,0.00012821892,0.000047282418,0.000025650705,0.00023768554,0.000022014952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041868433,0.00087969465,0.0004953369,0.0011029395,0.0005110226,0.0012333485,0.0020219167,0.00093535415,0.011263737],"category_scores_gemma":[0.00094128906,0.000459028,0.0007900511,0.0011600499,0.0001937068,0.0012832797,0.0004048848,0.0006909964,0.0019462281],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005758956,0.000052920484,0.0024947855,0.0000985206,0.000021161744,0.00018628367,0.000033508695,0.9645653,0.00064798055,0.008908026,0.0051739933,0.017760087],"study_design_scores_gemma":[0.000010329418,0.000025292662,0.0009822923,0.000012278988,0.000018435052,0.00007977371,0.000026033866,0.9921101,0.00036389177,0.0016634961,0.00469777,0.000010353561],"about_ca_topic_score_codex":0.031573355,"about_ca_topic_score_gemma":0.017386928,"teacher_disagreement_score":0.031573355,"about_ca_system_score_codex":0.001782696,"about_ca_system_score_gemma":0.0018381831,"threshold_uncertainty_score":0.06277913},"labels":[],"label_agreement":null},{"id":"W3008251541","doi":"10.37367/jpi.v2i2.54","title":"Factors That Influence the Selection of the Solo Soemarmo Airport Train Mode","year":2018,"lang":"en","type":"article","venue":"Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Train; Transport engineering; Schedule; Sample (material); Operations research; Mode (computer interface); Government (linguistics); Service (business); Passenger train; Computer science; Engineering; Operations management; Business; Marketing; Geography","score_opus":0.013923628867234156,"score_gpt":0.21623776212913873,"score_spread":0.20231413326190456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008251541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9942114,0.000043956035,0.0002764103,0.00012331833,0.000008675233,0.000016817858,0.00006123406,0.0000028181848,0.0052553234],"genre_scores_gemma":[0.99801457,0.000053934986,0.00020361123,0.000015713034,0.0000040440555,0.00000831212,0.00004707906,0.0000032065643,0.0016495822],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994554,0.00020843251,0.000041114527,0.000057032732,0.00012768533,0.00011037236],"domain_scores_gemma":[0.99631125,0.0018287953,0.0008019656,0.00011709023,0.00041302305,0.000527803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092857995,0.00014081728,0.000099228775,0.00040664538,0.00044499605,0.0011445709,0.00017916579,0.0002470717,0.0072632725],"category_scores_gemma":[0.0058008325,0.0000885901,0.00019530005,0.0005744455,0.000321837,0.0004070039,0.00028771712,0.0003774119,0.0010431336],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001589692,0.00022216378,0.97882175,0.000041238683,0.000024129442,0.0002921093,0.0023194826,0.00058322184,0.0016523562,0.00075423066,0.0006864929,0.014443961],"study_design_scores_gemma":[0.000005048742,0.00009835875,0.98620266,0.000029421108,0.000016803593,0.00016776014,0.008868572,0.0011080218,0.00041337585,0.00020800359,0.0028688184,0.00001323325],"about_ca_topic_score_codex":0.0071639717,"about_ca_topic_score_gemma":0.013225454,"teacher_disagreement_score":0.0072632725,"about_ca_system_score_codex":0.00033840435,"about_ca_system_score_gemma":0.00053163787,"threshold_uncertainty_score":0.024298072},"labels":[],"label_agreement":null},{"id":"W3013721626","doi":"10.25139/jprs.v3i1.2440","title":"Peningkatan Keselamatan Pada Simpang Dengan Menerapkan RHK Sepeda Motor (Studi Kasus Simpang Empat Bersinyal Srikandi Di Kabupaten Pasuruan)","year":2020,"lang":"en","type":"article","venue":"Ge-STRAM Jurnal Perencanaan dan Rekayasa Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Queue; Intersection (aeronautics); Transport engineering; Degree of saturation; Mathematics; Geography; Engineering; Computer science; Environmental science; Computer network","score_opus":0.02160603270588044,"score_gpt":0.2063803740419839,"score_spread":0.18477434133610346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013721626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85193145,0.0037437335,0.0023773573,0.00058639806,0.00012579303,0.00013247624,0.0011390401,0.00012695749,0.13983676],"genre_scores_gemma":[0.9253686,0.0034583786,0.00427608,0.0000889058,0.00002462955,0.00010401051,0.00081259856,0.00004266141,0.065824196],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999785,0.000034592817,0.00001562622,0.000066034234,0.0000631438,0.00003560755],"domain_scores_gemma":[0.9997987,0.000048981787,0.000037450558,0.000013251793,0.00007184842,0.000029779305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029179567,0.0003353602,0.00020245175,0.00053879485,0.00075240113,0.0014782534,0.00028962633,0.00023521543,0.012824136],"category_scores_gemma":[0.00039691653,0.0001875342,0.00021497054,0.00081633346,0.00028077365,0.0011872471,0.00061829784,0.00058899855,0.002863735],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005101498,0.001206267,0.28813395,0.001565004,0.000108354885,0.0035157863,0.018433463,0.0031848017,0.008602143,0.016179975,0.02436935,0.63419074],"study_design_scores_gemma":[0.000028168635,0.00083274907,0.6075549,0.00069019187,0.00016152955,0.0032548194,0.04825278,0.0038237255,0.009522758,0.0026841403,0.32311165,0.00008259727],"about_ca_topic_score_codex":0.0051083225,"about_ca_topic_score_gemma":0.016097693,"teacher_disagreement_score":0.012824136,"about_ca_system_score_codex":0.00086014427,"about_ca_system_score_gemma":0.0012840666,"threshold_uncertainty_score":0.04290104},"labels":[],"label_agreement":null},{"id":"W3016627988","doi":"10.25105/pakar.v0i0.6817","title":"TINGKAT KEBISINGAN LINGKUNGAN SIANG MALAM (LSM) DI KAWASAN TERMINAL BUS BARANANGSIANG, KOTA BOGOR","year":2020,"lang":"id","type":"article","venue":"Prosiding Seminar Nasional Pakar","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.018595186607320797,"score_gpt":0.21406087142310626,"score_spread":0.19546568481578547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016627988","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7534809,0.0029422657,0.005202107,0.0028697986,0.0007478621,0.0005510615,0.02187617,0.001096525,0.21123336],"genre_scores_gemma":[0.69437563,0.0019431434,0.006955662,0.0005031385,0.00007905401,0.00036665617,0.01146545,0.00034748754,0.28396386],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99978226,0.000024915491,0.000011284949,0.00003782085,0.00006534632,0.000078363104],"domain_scores_gemma":[0.9997545,0.00001911124,0.000029537014,0.000016408874,0.000119118886,0.000061314575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024086141,0.00044583337,0.00024494875,0.00053129793,0.0012847676,0.0010009868,0.00041690742,0.00048420133,0.03017454],"category_scores_gemma":[0.00041590098,0.0002257142,0.00021971151,0.00075334456,0.0003923792,0.00049679016,0.0014337793,0.00070249866,0.0065157204],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017921596,0.00030062167,0.31776848,0.002022642,0.00011791908,0.004123475,0.014228357,0.0023824272,0.059772383,0.006749525,0.13254115,0.45820087],"study_design_scores_gemma":[0.000024451996,0.00023465019,0.536254,0.0003169112,0.00004437767,0.00066346617,0.014472546,0.00095174095,0.00851425,0.000502857,0.43795663,0.000064145206],"about_ca_topic_score_codex":0.101454854,"about_ca_topic_score_gemma":0.28904748,"teacher_disagreement_score":0.101454854,"about_ca_system_score_codex":0.0020803348,"about_ca_system_score_gemma":0.0034364741,"threshold_uncertainty_score":0.20172864},"labels":[],"label_agreement":null},{"id":"W3021831642","doi":"10.33701/jtp.v12i1.894","title":"Manajemen Transportasi Cerdas BRT Jakarta","year":2020,"lang":"en","type":"article","venue":"TRANSFORMASI Jurnal Manajemen Pemerintahan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Computer science; Qualitative research; Quality (philosophy); World Wide Web; Transport engineering; Business; Knowledge management; Engineering; Sociology","score_opus":0.013020454503905304,"score_gpt":0.17354657564791792,"score_spread":0.16052612114401263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021831642","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5842266,0.011690298,0.005974158,0.00443492,0.0009140094,0.00019118325,0.0032149826,0.0003092445,0.38904464],"genre_scores_gemma":[0.90486616,0.0069832527,0.0038237511,0.0003750456,0.000084389525,0.00014407493,0.0014823109,0.000119801436,0.08212126],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994854,0.0000920645,0.000033744804,0.00009145213,0.00017979858,0.00011756491],"domain_scores_gemma":[0.99969983,0.000087003806,0.000052310403,0.000023235987,0.00008748488,0.00005019964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043563952,0.00042147905,0.0003287967,0.0010215635,0.0029987239,0.0049804715,0.00038271234,0.000460341,0.022993432],"category_scores_gemma":[0.0009842681,0.00022657627,0.00022997636,0.0020994302,0.00097620895,0.0011215615,0.0020402118,0.0009728687,0.002942964],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064258097,0.00044646408,0.12244102,0.0031468128,0.00016197909,0.010792208,0.054891735,0.0045231697,0.0112129655,0.2928865,0.056598283,0.4422563],"study_design_scores_gemma":[0.000012857088,0.00009166741,0.13673645,0.001121064,0.000101015095,0.003131299,0.06277994,0.00187419,0.003991177,0.0066428417,0.78342724,0.000090359565],"about_ca_topic_score_codex":0.046414312,"about_ca_topic_score_gemma":0.08743487,"teacher_disagreement_score":0.046414312,"about_ca_system_score_codex":0.0044524865,"about_ca_system_score_gemma":0.0060993712,"threshold_uncertainty_score":0.092288315},"labels":[],"label_agreement":null},{"id":"W3023168307","doi":"10.25105/psia.v1i1.5963","title":"ANALISIS KAPASITAS TERMINAL PENUMPANG BANDAR UDARA SENTANI DI JAYAPURA","year":2019,"lang":"id","type":"article","venue":"Prosiding Seminar Intelektual Muda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.008506575229141545,"score_gpt":0.21572023512085328,"score_spread":0.20721365989171173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023168307","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95811707,0.0052377502,0.0044671283,0.00094903837,0.00020122992,0.0004171311,0.0019157002,0.00009928901,0.028595537],"genre_scores_gemma":[0.94736165,0.0039462554,0.007009192,0.000571386,0.00006878898,0.00031616504,0.0012033317,0.00006244651,0.039460834],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984799,0.0003548933,0.00010221073,0.0002740165,0.000528357,0.00026053918],"domain_scores_gemma":[0.99778545,0.00068444107,0.00040150585,0.00012210474,0.00077465305,0.00023173551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013268453,0.0007395751,0.0005585641,0.0020151476,0.0014329555,0.0022727328,0.0007331455,0.0009273753,0.013472274],"category_scores_gemma":[0.0027971072,0.00048419807,0.00076751725,0.0013611853,0.0010396607,0.0010756407,0.0013005444,0.0015339376,0.0023463136],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011290441,0.0008762608,0.7319724,0.0032747504,0.00039194842,0.007062598,0.036144856,0.0006242857,0.045615908,0.0034480826,0.007865538,0.16159436],"study_design_scores_gemma":[0.000020436959,0.0014211906,0.835673,0.0012755528,0.0003419351,0.007270613,0.08074747,0.0010768679,0.01559553,0.0015462404,0.0548965,0.00013471772],"about_ca_topic_score_codex":0.008902385,"about_ca_topic_score_gemma":0.01459138,"teacher_disagreement_score":0.013472274,"about_ca_system_score_codex":0.0007965758,"about_ca_system_score_gemma":0.0011809585,"threshold_uncertainty_score":0.045069277},"labels":[],"label_agreement":null},{"id":"W3023175918","doi":"10.26593/jtrans.v20i1.3854.37-46","title":"KINERJA MANAJEMEN LALU LINTAS BARU DI KAWASAN LOSARI KOTA MAKASSAR","year":2020,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transport engineering; Traffic congestion; Business; Engineering","score_opus":0.016483102359790655,"score_gpt":0.18445925131352678,"score_spread":0.16797614895373614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023175918","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86023486,0.005054583,0.0034974648,0.0031437702,0.0004633483,0.00017980885,0.0008778729,0.00028679712,0.12626146],"genre_scores_gemma":[0.9471566,0.0031169364,0.003211147,0.0002489041,0.000090192836,0.000118615506,0.0005974718,0.000034930108,0.045425218],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996799,0.000043273278,0.00002615676,0.000060239978,0.00009728301,0.00009320572],"domain_scores_gemma":[0.9994747,0.00007654194,0.000092184324,0.000024630837,0.00023699708,0.000094945266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002905999,0.0005490659,0.00034956253,0.0009770711,0.002074946,0.0022357565,0.00054065976,0.00052728865,0.02007027],"category_scores_gemma":[0.00054893264,0.00019450262,0.00030257736,0.0011791105,0.000569521,0.0011526577,0.001239116,0.0007516959,0.0034011463],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001590506,0.0012805519,0.31240314,0.0039350954,0.00022219605,0.01867325,0.026604163,0.006005768,0.06526322,0.046883248,0.048781544,0.46835735],"study_design_scores_gemma":[0.000099406825,0.0010175817,0.37123373,0.0015228344,0.00037060608,0.0067637493,0.09187328,0.0070226872,0.023143616,0.009341924,0.48732615,0.00028454346],"about_ca_topic_score_codex":0.012817576,"about_ca_topic_score_gemma":0.028136756,"teacher_disagreement_score":0.02007027,"about_ca_system_score_codex":0.0019050372,"about_ca_system_score_gemma":0.0023261972,"threshold_uncertainty_score":0.06714177},"labels":[],"label_agreement":null},{"id":"W3031518480","doi":"10.25105/psia.v1i1.5977","title":"IDENTIFIKASI TINGKAT FAKTOR KEPUASAN PENGGUNA HALTE TRANSJAKARTA","year":2019,"lang":"id","type":"article","venue":"Prosiding Seminar Intelektual Muda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.008003374080858877,"score_gpt":0.2031924444909311,"score_spread":0.19518907041007222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031518480","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9526591,0.003833795,0.010093429,0.00072125887,0.00026178928,0.00032548758,0.0033109696,0.00021392757,0.028580286],"genre_scores_gemma":[0.962805,0.0023877409,0.008513233,0.00017847546,0.0000650233,0.00022544293,0.0024103648,0.000068442976,0.023346197],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99825174,0.00032449755,0.00020230823,0.0003806581,0.00059918803,0.00024156041],"domain_scores_gemma":[0.9961538,0.0011907102,0.000704672,0.00043190832,0.0012147758,0.00030414434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021096969,0.0009961553,0.0008756045,0.0024264788,0.0014555743,0.004000468,0.0005888638,0.00086007704,0.014285721],"category_scores_gemma":[0.004661597,0.0004993813,0.0011924249,0.0022716129,0.00074756367,0.0015184568,0.0015159826,0.0011262493,0.0035800182],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011290499,0.00043900558,0.73682207,0.0010557895,0.00042991087,0.0011107608,0.00479574,0.0009105233,0.028532827,0.001836886,0.0048979516,0.21803954],"study_design_scores_gemma":[0.000025485138,0.0008944496,0.89669645,0.00037272947,0.00063877966,0.0019245165,0.012909355,0.0025314898,0.03278747,0.002150157,0.048920456,0.00014871695],"about_ca_topic_score_codex":0.008119097,"about_ca_topic_score_gemma":0.012388386,"teacher_disagreement_score":0.014285721,"about_ca_system_score_codex":0.0009306702,"about_ca_system_score_gemma":0.0016527056,"threshold_uncertainty_score":0.047790468},"labels":[],"label_agreement":null},{"id":"W3032996831","doi":"10.31869/rtj.v3i2.1792","title":"Evaluasi Penggunaan JPO di Kecamatan Widang Tuban Jawa Timur","year":2020,"lang":"id","type":"article","venue":"Rang Teknik Journal","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.01906475963921278,"score_gpt":0.21239653770505074,"score_spread":0.19333177806583796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3032996831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92404205,0.015479882,0.02014792,0.0007768104,0.0005647558,0.0012711484,0.0048808423,0.00060276454,0.032233804],"genre_scores_gemma":[0.926218,0.009187663,0.021413757,0.000376766,0.00014340835,0.001318457,0.0028542853,0.00028856206,0.038199052],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9984257,0.00031955465,0.00011197436,0.00023743777,0.0007333328,0.00017206259],"domain_scores_gemma":[0.99836284,0.0005645482,0.00017937295,0.00011437227,0.00061953074,0.00015933171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00199459,0.0009567934,0.0009816876,0.00084521924,0.00055505516,0.0014620216,0.00043635562,0.00072419987,0.009916596],"category_scores_gemma":[0.0024771153,0.00036068168,0.0009827178,0.0007508845,0.00050239085,0.00096708455,0.0006810267,0.0010785265,0.0019787524],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.017197536,0.0034187406,0.08698443,0.0073459186,0.000731835,0.0007069818,0.0031161092,0.0051905,0.43516493,0.0024638807,0.009527245,0.428152],"study_design_scores_gemma":[0.0005778143,0.027261838,0.30092254,0.00114865,0.003068361,0.0011950632,0.006952143,0.013053911,0.51319516,0.0034762586,0.12873913,0.0004091694],"about_ca_topic_score_codex":0.004128334,"about_ca_topic_score_gemma":0.0062225983,"teacher_disagreement_score":0.009916596,"about_ca_system_score_codex":0.00058262114,"about_ca_system_score_gemma":0.0012185571,"threshold_uncertainty_score":0.033174336},"labels":[],"label_agreement":null},{"id":"W3039476395","doi":"10.36341/racic.v5i1.1355","title":"PERENCANAAN ULANG TRAFFIC LIGHT PADA SIMPANG PRESIDEN KOTA PADANG","year":2020,"lang":"id","type":"article","venue":"Racic Rab Construction Research","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.053501145066015755,"score_gpt":0.292873057219186,"score_spread":0.23937191215317025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039476395","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21850657,0.004391587,0.012520391,0.006466379,0.0029475708,0.0005440539,0.010407543,0.004065348,0.7401506],"genre_scores_gemma":[0.37805718,0.0026241976,0.0076851593,0.0011802929,0.00028062484,0.00023070938,0.005613124,0.0005959264,0.6037328],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996816,0.000033503693,0.000012295557,0.000071413284,0.00009193017,0.000109362765],"domain_scores_gemma":[0.9996393,0.000033949527,0.000025711493,0.000030443456,0.00018213262,0.0000884657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003633924,0.0006258088,0.00024259709,0.00062424655,0.0018182555,0.002204063,0.0005109028,0.00078659854,0.078253224],"category_scores_gemma":[0.00047441342,0.0002788385,0.00032198709,0.000909939,0.0005382731,0.0013016701,0.001766068,0.00117425,0.022050643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001108763,0.0006097329,0.043214392,0.0017032981,0.00009795187,0.002820589,0.0045658755,0.0020877407,0.041350733,0.05326943,0.29395482,0.5552166],"study_design_scores_gemma":[0.000020175588,0.0000961727,0.021571811,0.00011179137,0.00002725956,0.00038010458,0.0022492507,0.0006467092,0.004999329,0.0014259606,0.96843576,0.000035786357],"about_ca_topic_score_codex":0.025978804,"about_ca_topic_score_gemma":0.042209946,"teacher_disagreement_score":0.078253224,"about_ca_system_score_codex":0.0016969152,"about_ca_system_score_gemma":0.0030415675,"threshold_uncertainty_score":0.26178312},"labels":[],"label_agreement":null},{"id":"W3047928201","doi":"10.21776/ub.takoda.2020.012.02.1","title":"Faktor-faktor Yang Mempengaruhi Preferensi Masyarakat Dalam Menggunakan Moda Mass Rapid Transit (MRT) Kota Jakarta","year":2020,"lang":"id","type":"article","venue":"Jurnal Perencanaan Kota dan Daerah/Jurnal Tata Kota dan Daerah","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics; Physics; Business administration; Business","score_opus":0.025313852849005652,"score_gpt":0.21146803022252392,"score_spread":0.18615417737351828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047928201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6563851,0.025070898,0.007702719,0.012567044,0.0011925097,0.0005191294,0.00812702,0.0004956868,0.28793988],"genre_scores_gemma":[0.8858375,0.012519155,0.0044087013,0.0011155392,0.00022804129,0.00023239602,0.002342852,0.00007697286,0.09323889],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988709,0.0002970032,0.00010770066,0.00017835434,0.00032359274,0.00022243724],"domain_scores_gemma":[0.99846566,0.00050332514,0.0002882042,0.00012804862,0.00037149002,0.00024332957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010785589,0.0005573542,0.00062035903,0.00095386984,0.0017377151,0.004178006,0.00052269717,0.00068827113,0.041643538],"category_scores_gemma":[0.0026605937,0.00027071184,0.0005192353,0.0013594766,0.0006287864,0.0016454896,0.0013133278,0.001021878,0.0070325797],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013091718,0.0008404172,0.28161973,0.0032455695,0.00038717152,0.0026870586,0.005470682,0.0011414293,0.008417772,0.01675911,0.06184845,0.61627346],"study_design_scores_gemma":[0.00010159452,0.000688808,0.4399047,0.0013785207,0.00049210317,0.004778932,0.01957272,0.0020366185,0.0081288805,0.006320197,0.5163485,0.00024853088],"about_ca_topic_score_codex":0.012929257,"about_ca_topic_score_gemma":0.0207354,"teacher_disagreement_score":0.041643538,"about_ca_system_score_codex":0.0015696632,"about_ca_system_score_gemma":0.0027677445,"threshold_uncertainty_score":0.13931149},"labels":[],"label_agreement":null},{"id":"W3048728615","doi":"10.3968/11768","title":"Analysis of Legislative Proposals of China’s Comprehensive Transportation Law","year":2020,"lang":"en","type":"article","venue":"Higher education of social science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Legislation; Legislature; China; Field (mathematics); Political science; Law; Business; Law and economics; Economics","score_opus":0.01831235891100286,"score_gpt":0.267153183283478,"score_spread":0.24884082437247512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048728615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5905764,0.0017869237,0.0149447415,0.020635592,0.00062664767,0.0014702808,0.0012416632,0.00016787651,0.3685499],"genre_scores_gemma":[0.9493276,0.0011958666,0.007695402,0.0033503552,0.0002167785,0.0009498527,0.000855934,0.00004047293,0.036367685],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98523444,0.003695432,0.0010423138,0.0013264815,0.006148314,0.0025529834],"domain_scores_gemma":[0.986989,0.006143055,0.0011058954,0.0007587671,0.004596414,0.0004068166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020436466,0.0005111112,0.0005891341,0.0048077423,0.0056105736,0.0060877763,0.0021929636,0.0027187672,0.0073591867],"category_scores_gemma":[0.01961756,0.00064133113,0.0011331312,0.0035076197,0.0037501315,0.0034597684,0.0022071975,0.0031539926,0.00046009358],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005247435,0.00008745212,0.009697166,0.00020338425,0.000038130747,0.00057694246,0.00632205,0.00249148,0.00087611435,0.9531703,0.010743878,0.015740475],"study_design_scores_gemma":[0.00033708682,0.0005846699,0.14850077,0.001701342,0.00088802923,0.0006356014,0.02910605,0.06329669,0.0077122133,0.24956304,0.4971816,0.0004928266],"about_ca_topic_score_codex":0.047005974,"about_ca_topic_score_gemma":0.038124282,"teacher_disagreement_score":0.047005974,"about_ca_system_score_codex":0.012423679,"about_ca_system_score_gemma":0.031494804,"threshold_uncertainty_score":0.10807967},"labels":[],"label_agreement":null},{"id":"W3064167302","doi":"10.26593/jtrans.v20i2.4106.137-150","title":"PERJALANAN MANDIRI SISWA SMP PASCAPENERAPAN SISTEM ZONASI PENERIMAAN SISWA BARU DI KOTA YOGYAKARTA","year":2020,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Zoning; Geography; Humanities; Engineering; Civil engineering; Art","score_opus":0.01557560682266725,"score_gpt":0.1782624427611726,"score_spread":0.16268683593850533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3064167302","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9229609,0.007637459,0.0015998047,0.0027715715,0.00029886505,0.00029596488,0.0018121284,0.00017101028,0.0624523],"genre_scores_gemma":[0.9315078,0.0062012067,0.0052813683,0.00034545833,0.000061554805,0.0002586791,0.0015933801,0.000038571037,0.054712046],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998927,0.000018971721,0.000008762865,0.000021103575,0.00002250126,0.000035844307],"domain_scores_gemma":[0.9998455,0.000032568754,0.000036466994,0.0000093935505,0.000044310527,0.000031691958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018321122,0.00032338037,0.00022360602,0.00043276657,0.0010220386,0.0007438829,0.0002623771,0.00028914268,0.020006284],"category_scores_gemma":[0.00026192272,0.00016220333,0.00017260053,0.0006956308,0.00029235875,0.0003555408,0.00060653745,0.00053822284,0.0012489205],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060020864,0.000922812,0.33330917,0.0038686197,0.00013308346,0.010291133,0.018857855,0.0012489326,0.052457485,0.011491385,0.05216619,0.5146532],"study_design_scores_gemma":[0.000033422937,0.00030317076,0.71332884,0.00070609647,0.00011842546,0.0026917162,0.027656844,0.00092191814,0.004993507,0.0007958026,0.24839503,0.00005525477],"about_ca_topic_score_codex":0.01975913,"about_ca_topic_score_gemma":0.04472461,"teacher_disagreement_score":0.020006284,"about_ca_system_score_codex":0.00083407114,"about_ca_system_score_gemma":0.0021976775,"threshold_uncertainty_score":0.06692761},"labels":[],"label_agreement":null},{"id":"W3082582445","doi":"10.25104/jptd.v22i1.1600","title":"Analisis Implikasi Pengoperasian Trans Jateng Terhadap Biaya Transportasi Bekerja Buruh Industri (Studi Kasus: Koridor I Kedungsepur)","year":2020,"lang":"id","type":"article","venue":"Jurnal Penelitian Transportasi Darat","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Metropolitan area; Business; Business administration; Geography; Archaeology","score_opus":0.025722861180497898,"score_gpt":0.2208320524630901,"score_spread":0.1951091912825922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082582445","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9717961,0.0013424994,0.00030414373,0.00059575407,0.00002970001,0.00005787604,0.00024519762,0.000006912637,0.025621917],"genre_scores_gemma":[0.9822442,0.0014244615,0.00034766912,0.0001796668,0.000011723783,0.00006659297,0.00016270786,0.000011090586,0.015551921],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99854505,0.0004660086,0.000110180285,0.00021935048,0.00036937866,0.0002900196],"domain_scores_gemma":[0.9965071,0.001572143,0.0006598278,0.00015424313,0.0007118302,0.00039485673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020844124,0.00037186992,0.00036307485,0.0009641489,0.001871481,0.0044232346,0.0005976332,0.0006325838,0.012220168],"category_scores_gemma":[0.004133144,0.00030502075,0.00046885203,0.0014318076,0.0009781735,0.0019856489,0.0020213972,0.0010234377,0.0015666897],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036137959,0.00043533518,0.7863928,0.0010471325,0.00016533808,0.0014877759,0.13643232,0.0002194233,0.0017646172,0.006762166,0.004100127,0.060831502],"study_design_scores_gemma":[0.000007846016,0.00024659737,0.6769243,0.00042827294,0.00012050883,0.00039701143,0.29734856,0.00013023849,0.00069613353,0.0007218053,0.02295675,0.0000219556],"about_ca_topic_score_codex":0.017429005,"about_ca_topic_score_gemma":0.03646267,"teacher_disagreement_score":0.017429005,"about_ca_system_score_codex":0.0014037645,"about_ca_system_score_gemma":0.0027835008,"threshold_uncertainty_score":0.04088056},"labels":[],"label_agreement":null},{"id":"W3085665919","doi":"10.5539/ijsp.v9n6p1","title":"The New Bivariate Conway-Maxwell-Poisson Distribution Obtained by the Crossing Method","year":2020,"lang":"en","type":"article","venue":"International Journal of Statistics and Probability","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mathematics; Bivariate analysis; Poisson distribution; Negative binomial distribution; Bivariate data; Joint probability distribution; Compound Poisson distribution; Binomial distribution; Statistics; Applied mathematics; Zero-inflated model; Poisson regression","score_opus":0.012888853629266558,"score_gpt":0.2550637399948645,"score_spread":0.24217488636559792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3085665919","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007649942,0.00036334724,0.988364,0.00032206043,0.00010401776,0.000040212217,0.00017543334,0.00013748139,0.00284351],"genre_scores_gemma":[0.45254773,0.0031173576,0.515097,0.0008481582,0.0007675657,0.0006739988,0.0013947984,0.0006839301,0.024869394],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9978278,0.000877189,0.00009369772,0.0005169688,0.0004442483,0.00024000047],"domain_scores_gemma":[0.99670607,0.0016910632,0.0003500751,0.0003696874,0.00067019765,0.00021294877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004724307,0.0009050774,0.0009816043,0.00216896,0.00088656147,0.0020925885,0.0024624201,0.0011977827,0.007550767],"category_scores_gemma":[0.01203565,0.0004740515,0.0019777017,0.0025130396,0.0018027655,0.00324715,0.002182842,0.0030494914,0.001701039],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009026725,0.00005221578,0.0069623934,0.00016484674,0.0000767613,0.00041497563,0.000520642,0.07306458,0.0018077244,0.82835484,0.008075162,0.08041552],"study_design_scores_gemma":[0.00002649639,0.00008134336,0.0026818055,0.00008409389,0.000060319853,0.00086103095,0.000226938,0.6286017,0.0014915233,0.34428358,0.021504581,0.00009674634],"about_ca_topic_score_codex":0.005146257,"about_ca_topic_score_gemma":0.0028899233,"teacher_disagreement_score":0.007550767,"about_ca_system_score_codex":0.0016303594,"about_ca_system_score_gemma":0.0018753962,"threshold_uncertainty_score":0.025259852},"labels":[],"label_agreement":null},{"id":"W3088603545","doi":"","title":"IMPLEMENTASI DAN ANALISIS DATA MINING UNTUK PENCARIAN POLA PENYEBAB KECELAKAAN LALU LINTASDENGAN METODE APRIORI","year":2018,"lang":"id","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.04969974371065362,"score_gpt":0.28765730155401864,"score_spread":0.23795755784336503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088603545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21047024,0.0069077318,0.64619,0.006510301,0.0008639932,0.002341606,0.021763522,0.043024637,0.061928008],"genre_scores_gemma":[0.35487783,0.003254136,0.5983486,0.0006854318,0.00013575966,0.0009963026,0.017233226,0.0012933735,0.023175325],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.994663,0.0010981354,0.00061814586,0.0011928733,0.0020471115,0.0003806378],"domain_scores_gemma":[0.9921055,0.003541523,0.0004227157,0.0011356535,0.0025195621,0.00027501376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00521136,0.0016116035,0.0013572463,0.0041980855,0.0013673486,0.006985431,0.0018844339,0.0012429233,0.009053313],"category_scores_gemma":[0.012164324,0.0008861505,0.0020360122,0.0045171436,0.0007101849,0.004180227,0.0022237191,0.0019070639,0.006660487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014583546,0.0007634978,0.042814337,0.003138669,0.00062330207,0.0016973934,0.003857175,0.019953305,0.033726346,0.0135479085,0.030953929,0.8474658],"study_design_scores_gemma":[0.00028710638,0.0010502886,0.045412265,0.0017828514,0.00091440126,0.0027950807,0.012959635,0.36296844,0.16470242,0.036879554,0.36982366,0.00042421982],"about_ca_topic_score_codex":0.010624125,"about_ca_topic_score_gemma":0.010881471,"teacher_disagreement_score":0.010624125,"about_ca_system_score_codex":0.0015111502,"about_ca_system_score_gemma":0.0043092957,"threshold_uncertainty_score":0.030286372},"labels":[],"label_agreement":null},{"id":"W3093805296","doi":"10.37277/stch.v25i1.145","title":"Perencanaan dan Perancangan Lanskap Jalan Margonda Raya di Kota Depok","year":2018,"lang":"id","type":"article","venue":"Sainstech Jurnal Penelitian dan Pengkajian Sains dan Teknologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Forestry; Geography; Art","score_opus":0.014025269738223461,"score_gpt":0.22333687191957502,"score_spread":0.20931160218135156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3093805296","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53167516,0.065193236,0.024850218,0.012852686,0.0031896916,0.0010648789,0.005406313,0.0018135479,0.35395432],"genre_scores_gemma":[0.6468593,0.032198407,0.032176312,0.0033654505,0.00035158626,0.0005474316,0.0024726808,0.00068115647,0.2813478],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992642,0.0001396384,0.0000413816,0.00017032048,0.00021362322,0.00017091748],"domain_scores_gemma":[0.99929774,0.0001158834,0.0001214809,0.00007150422,0.000269999,0.00012331702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007380054,0.0012536162,0.0009977672,0.0017096398,0.0029294186,0.0049228864,0.00090860954,0.0014766051,0.04259739],"category_scores_gemma":[0.00080814905,0.00079462363,0.0010197234,0.0016823908,0.0012947257,0.002921081,0.002383271,0.002137363,0.012337506],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022634252,0.0007843507,0.035049837,0.008351117,0.0005341574,0.006168143,0.008750052,0.0010903608,0.53048277,0.027879614,0.027877927,0.35076812],"study_design_scores_gemma":[0.00006188638,0.0006903622,0.038268775,0.0010600433,0.00037512727,0.0029283853,0.0107264165,0.0005070689,0.10261803,0.005092852,0.8375033,0.00016777056],"about_ca_topic_score_codex":0.0061637056,"about_ca_topic_score_gemma":0.022605142,"teacher_disagreement_score":0.04259739,"about_ca_system_score_codex":0.0018733534,"about_ca_system_score_gemma":0.0029421174,"threshold_uncertainty_score":0.14250243},"labels":[],"label_agreement":null},{"id":"W3096363008","doi":"10.29138/spirit.v7i1.1476","title":"ANALISIS KEPUASAN PELANGGAN TERHADAP JASA TERMINAL PENUMPANG PADA PELABUHAN GRESIK","year":2021,"lang":"id","type":"article","venue":"E-Jurnal SPIRIT PRO PATRIA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.01619623403795643,"score_gpt":0.232707008075914,"score_spread":0.21651077403795757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096363008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9440926,0.0011512993,0.006022944,0.0005217944,0.0001093679,0.0001754464,0.0051244358,0.00024835026,0.042553708],"genre_scores_gemma":[0.9354725,0.0011023919,0.0072740666,0.00021897757,0.00002422078,0.00016049232,0.0038716088,0.00013223599,0.051743567],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99878055,0.00015307484,0.000067750705,0.00026587726,0.000558492,0.00017421895],"domain_scores_gemma":[0.9971296,0.0009549488,0.00029666474,0.00013146439,0.0013122947,0.00017500084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008375005,0.00055122445,0.00047102728,0.0018933133,0.0010011585,0.0018617494,0.00048265504,0.00056836946,0.015455707],"category_scores_gemma":[0.002075021,0.00024513892,0.00067672937,0.0025974358,0.00043910707,0.0012553416,0.00084280816,0.0009309181,0.0034260317],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019321664,0.0006887916,0.6019973,0.0019044791,0.00034586823,0.0024645696,0.009565799,0.004160467,0.09556645,0.0029989046,0.01556042,0.2628147],"study_design_scores_gemma":[0.000017734455,0.0008510112,0.84342617,0.00023623696,0.00020758499,0.00095041114,0.035370506,0.0042653168,0.040061463,0.0011548972,0.07334768,0.000110891095],"about_ca_topic_score_codex":0.0153176775,"about_ca_topic_score_gemma":0.031676035,"teacher_disagreement_score":0.015455707,"about_ca_system_score_codex":0.0010417178,"about_ca_system_score_gemma":0.0009961402,"threshold_uncertainty_score":0.051704466},"labels":[],"label_agreement":null},{"id":"W3097070036","doi":"10.25105/psia.v1i1.5980","title":"EVALUASI KAPASITAS TERMINAL PENUMPANG DOMESTIK BANDAR UDARA BANYUWANGI, JAWA TIMUR","year":2019,"lang":"id","type":"article","venue":"Prosiding Seminar Intelektual Muda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.008818299392634387,"score_gpt":0.2251198666068398,"score_spread":0.2163015672142054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097070036","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7957229,0.0011221784,0.04727056,0.00073924864,0.00017638868,0.00075308676,0.0028321708,0.00043371238,0.15094967],"genre_scores_gemma":[0.9343646,0.00062225916,0.021842906,0.00010102214,0.000026454123,0.00046410348,0.0017939266,0.00015077482,0.040633757],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9984895,0.0005173684,0.00007776458,0.0002160329,0.00052233966,0.00017706944],"domain_scores_gemma":[0.9976501,0.0009963402,0.00014483611,0.00014055788,0.0009031016,0.00016502704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024307359,0.00076463545,0.0005741253,0.0012293156,0.0010430019,0.003511118,0.00048727755,0.0005603926,0.027940137],"category_scores_gemma":[0.0045927297,0.00022811332,0.0006359454,0.0012458646,0.00071267184,0.002240899,0.0013852174,0.0009546148,0.0027220761],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034809108,0.002060041,0.19207656,0.0030164532,0.00048538673,0.00069391384,0.023767956,0.043815665,0.041237075,0.05706829,0.024121461,0.60817635],"study_design_scores_gemma":[0.00017617371,0.004195421,0.5439681,0.0015380196,0.0009984557,0.00047429174,0.0904408,0.09302289,0.056554634,0.03825068,0.16993694,0.0004436781],"about_ca_topic_score_codex":0.0083813565,"about_ca_topic_score_gemma":0.01618123,"teacher_disagreement_score":0.027940137,"about_ca_system_score_codex":0.001872675,"about_ca_system_score_gemma":0.0018333242,"threshold_uncertainty_score":0.09346902},"labels":[],"label_agreement":null},{"id":"W3097741265","doi":"10.25105/psia.v1i1.5979","title":"EVALUASI TEBAL PERKERASAN LANDAS PACU PADA BANDAR UDARA INTERNASIONAL JAWA BARAT KABUPATEN MAJALENGKA","year":2019,"lang":"id","type":"article","venue":"Prosiding Seminar Intelektual Muda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.009886783914330151,"score_gpt":0.22004430661205412,"score_spread":0.21015752269772398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097741265","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8662155,0.0010010975,0.030496582,0.0004955705,0.00026429832,0.00047630488,0.003192079,0.0011336491,0.09672487],"genre_scores_gemma":[0.91763157,0.0006666752,0.017987674,0.00009635541,0.000037071382,0.00021541533,0.0029437763,0.0003421727,0.060079213],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988379,0.00025558396,0.000055288405,0.00019048313,0.0005281518,0.0001326587],"domain_scores_gemma":[0.9977055,0.0007052335,0.00016020193,0.00017055977,0.0010569653,0.0002015447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001029016,0.0007920454,0.0004115912,0.00086333964,0.00049828837,0.001644693,0.0003647305,0.0005335802,0.027127339],"category_scores_gemma":[0.0025780087,0.0001988503,0.000397236,0.0007317405,0.00027545186,0.0011666751,0.00071460666,0.0005843056,0.004691316],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0051277406,0.0025721162,0.111626945,0.0020381247,0.0002137799,0.0005066892,0.0033327793,0.040317606,0.17774044,0.0037950804,0.03484644,0.61788225],"study_design_scores_gemma":[0.00018113498,0.010704138,0.55879754,0.0005243742,0.0006365905,0.00084996154,0.015950233,0.09747065,0.18675911,0.0036350342,0.124150515,0.00034075975],"about_ca_topic_score_codex":0.0048549427,"about_ca_topic_score_gemma":0.007849139,"teacher_disagreement_score":0.027127339,"about_ca_system_score_codex":0.0008062226,"about_ca_system_score_gemma":0.0005469859,"threshold_uncertainty_score":0.09074992},"labels":[],"label_agreement":null},{"id":"W3105259077","doi":"","title":"Perancangan lansekap rest area km. 62 jalan tol Cikampek Jawa Barat","year":2018,"lang":"id","type":"article","venue":"SKRIPSI-2009","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.012243442485155336,"score_gpt":0.20567450493051045,"score_spread":0.19343106244535513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105259077","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47301173,0.009435959,0.0033489964,0.0026044748,0.0005392787,0.00062566024,0.0095087085,0.0010606438,0.4998645],"genre_scores_gemma":[0.5754582,0.0041269385,0.0066877226,0.0006417856,0.00008397985,0.0003311602,0.0070358934,0.00021823593,0.4054161],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997559,0.000035322177,0.000012244444,0.000053721076,0.00005086898,0.00009185217],"domain_scores_gemma":[0.9998653,0.000020497135,0.000022819935,0.00001105146,0.000045740413,0.000034655994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021802327,0.0007819165,0.0003258708,0.0008771289,0.0024589754,0.002023135,0.00072299346,0.0006641801,0.059696883],"category_scores_gemma":[0.0002468381,0.00034678762,0.00038734003,0.0017323062,0.000674705,0.0005941939,0.0014485064,0.00052184815,0.010828752],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014142351,0.0007659623,0.14425907,0.0038088025,0.00027039894,0.015198969,0.014643701,0.0026654748,0.06125614,0.03272298,0.091270186,0.6317241],"study_design_scores_gemma":[0.000054787735,0.00027878807,0.19691922,0.00040152797,0.000092045346,0.005430161,0.019733459,0.0007307944,0.007159816,0.0015117233,0.7675877,0.00009988131],"about_ca_topic_score_codex":0.030668592,"about_ca_topic_score_gemma":0.07750881,"teacher_disagreement_score":0.059696883,"about_ca_system_score_codex":0.0017589964,"about_ca_system_score_gemma":0.0033340964,"threshold_uncertainty_score":0.19970596},"labels":[],"label_agreement":null},{"id":"W3105540484","doi":"10.58411/p86c6509","title":"KAJIAN KELAYAKAN PEMBANGUNAN PARKIR VERTIKAL KOTA MALANG","year":2020,"lang":"id","type":"article","venue":"PANGRIPTA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.017237678094144067,"score_gpt":0.18185769955274356,"score_spread":0.1646200214585995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105540484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88673717,0.0038585067,0.0023383126,0.0035720903,0.00017096671,0.000253206,0.007677861,0.00011255027,0.09527941],"genre_scores_gemma":[0.9490833,0.003301694,0.0032147742,0.00064848416,0.000045040942,0.00017662736,0.0028097203,0.000032911925,0.040687487],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995191,0.00011486741,0.000037863363,0.00006354244,0.00012692953,0.00013765003],"domain_scores_gemma":[0.9992083,0.00018003248,0.0001867012,0.000048314396,0.00024617618,0.00013056998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045088297,0.00026985529,0.00021512533,0.00067833817,0.0010616047,0.0014938007,0.0004197455,0.00036840874,0.021746727],"category_scores_gemma":[0.0011663829,0.0002228972,0.00036019375,0.0010691513,0.00040355502,0.0010349803,0.0010685236,0.00059544167,0.0018433592],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041383627,0.00028449358,0.7437182,0.0022636815,0.00024513912,0.0016440937,0.012784637,0.0004738289,0.010994256,0.006438437,0.022507545,0.19823185],"study_design_scores_gemma":[0.000023113493,0.00017735703,0.83753663,0.0006094919,0.00013293477,0.0010161832,0.027106974,0.00044808871,0.0036268842,0.0010595205,0.12820914,0.000053735814],"about_ca_topic_score_codex":0.03282868,"about_ca_topic_score_gemma":0.10308219,"teacher_disagreement_score":0.03282868,"about_ca_system_score_codex":0.0009941226,"about_ca_system_score_gemma":0.0022423868,"threshold_uncertainty_score":0.07275003},"labels":[],"label_agreement":null},{"id":"W3112780846","doi":"10.36870/insight.v3i1.193","title":"PENGUKURAN EFISIENSI DAN EFEKTIVITAS PELAYANAN ANGKUTAN BIS DI KAWASAN PERKOTAAN BINTUNI","year":2020,"lang":"id","type":"article","venue":"PLANNERS INSIGHT URBAN AND REGIONAL PLANNING JOURNAL","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Business administration; Business","score_opus":0.03219047282182886,"score_gpt":0.213228289933282,"score_spread":0.18103781711145314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112780846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9111294,0.031516515,0.00734635,0.0018770226,0.0005764904,0.00040289585,0.0034785015,0.00026153043,0.043411255],"genre_scores_gemma":[0.9174961,0.016683519,0.011050872,0.0012074285,0.00009130791,0.00057193416,0.0027714672,0.00014802995,0.04997939],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99926716,0.00014265339,0.00005591274,0.00017894176,0.00021893666,0.00013642295],"domain_scores_gemma":[0.99939,0.00016469044,0.00009589851,0.00004252112,0.00020557683,0.00010127665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090218097,0.0007430787,0.0009423242,0.0006808573,0.0010467147,0.0024827952,0.00047872736,0.0007698917,0.013180128],"category_scores_gemma":[0.000920528,0.00040003884,0.0009400477,0.0007182368,0.00063991675,0.0010476415,0.0012533709,0.0016624675,0.0024917226],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0045384443,0.0012905683,0.08151175,0.007467958,0.0005732277,0.0011913778,0.0059740613,0.0011548749,0.644094,0.0052250503,0.005595576,0.24138312],"study_design_scores_gemma":[0.00023171306,0.005625,0.35182825,0.0021087748,0.0015421303,0.0021796168,0.019706689,0.0021739434,0.3179439,0.0055732727,0.29080427,0.0002824168],"about_ca_topic_score_codex":0.008022385,"about_ca_topic_score_gemma":0.015299047,"teacher_disagreement_score":0.013180128,"about_ca_system_score_codex":0.001052719,"about_ca_system_score_gemma":0.0017126088,"threshold_uncertainty_score":0.04409194},"labels":[],"label_agreement":null},{"id":"W3118148894","doi":"","title":"Membangun Konsep Optimisme Beretika Untuk Mengatasi Partisipasi Anggaranterhadap Kesenjangan Anggaran (Studi Pada Dinas Keuangan Provinsi Papua)","year":2020,"lang":"id","type":"article","venue":"Business and Management Research","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business administration; Physics; Business","score_opus":0.06476817393392684,"score_gpt":0.2782167386268062,"score_spread":0.21344856469287934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118148894","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95711005,0.0021124473,0.0027084409,0.0008343703,0.00007331176,0.0001719077,0.0006901194,0.000030494713,0.03626888],"genre_scores_gemma":[0.9812151,0.00090324524,0.0018841393,0.0001828386,0.000018173827,0.00013494189,0.00022258132,0.00001341683,0.015425494],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99916995,0.00028924344,0.000040261682,0.00017106735,0.00016677949,0.00016274833],"domain_scores_gemma":[0.9987023,0.00056532427,0.00019987008,0.00013287325,0.00028310335,0.000116466945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017276397,0.00049328373,0.0004307408,0.00083640945,0.0012488217,0.0024276644,0.00050465955,0.00044866552,0.010961025],"category_scores_gemma":[0.002898211,0.0003473796,0.00052223826,0.0011035831,0.00092745875,0.0010852882,0.0012530163,0.00092871656,0.0010479251],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079531514,0.0006243846,0.6982345,0.0013386948,0.00047406115,0.001020209,0.05100268,0.0010917635,0.0054773516,0.012374082,0.003965255,0.22360171],"study_design_scores_gemma":[0.000028317712,0.0004613425,0.92571455,0.000417535,0.00028456256,0.00031131564,0.03864842,0.00050363515,0.0031440523,0.0053007584,0.025140189,0.000045368808],"about_ca_topic_score_codex":0.01617321,"about_ca_topic_score_gemma":0.033131674,"teacher_disagreement_score":0.01617321,"about_ca_system_score_codex":0.0012774781,"about_ca_system_score_gemma":0.0020094162,"threshold_uncertainty_score":0.0366683},"labels":[],"label_agreement":null},{"id":"W3127351098","doi":"10.54564/jtsa.v19i1.36","title":"Perencanaan Peningkatan Emplasemen Stasiun Sukabumi Untuk Mendukung Operasional Jalur Ganda Bogor-Sukabumi","year":2020,"lang":"id","type":"article","venue":"JURNAL TEKNIK SIPIL-ARSITEKTUR","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Track (disk drive); Block (permutation group theory); Transport engineering; Computer science; Engineering; Mathematics; Operating system","score_opus":0.023283910801487888,"score_gpt":0.2145938680260307,"score_spread":0.1913099572245428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127351098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71468616,0.013999822,0.030866412,0.0042923894,0.0011704954,0.00039706443,0.0013799266,0.0015318773,0.2316758],"genre_scores_gemma":[0.8255246,0.010330676,0.037691917,0.000559351,0.00008433067,0.00015188556,0.0013968468,0.00025615527,0.124004275],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997918,0.000021637605,0.000011896558,0.00004306181,0.000053746728,0.00007786014],"domain_scores_gemma":[0.99980897,0.000024209638,0.000029301373,0.00001622869,0.00006911182,0.00005214396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031811994,0.0007170646,0.00039722468,0.00052965916,0.0016521582,0.001957504,0.00052769465,0.0005957161,0.012524552],"category_scores_gemma":[0.0003363669,0.0002697681,0.00033191434,0.000711745,0.00053093495,0.00095418014,0.0009700379,0.0010434417,0.0029727602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00091787643,0.00073906087,0.06385739,0.001671107,0.00007136791,0.0061179856,0.00447766,0.009944739,0.050636876,0.03191465,0.025571765,0.80407953],"study_design_scores_gemma":[0.00007448246,0.000830391,0.14891337,0.0010221194,0.0001882417,0.0041822377,0.01664118,0.012748604,0.02326436,0.007678467,0.7842856,0.00017103499],"about_ca_topic_score_codex":0.013455826,"about_ca_topic_score_gemma":0.044039574,"teacher_disagreement_score":0.013455826,"about_ca_system_score_codex":0.0013201055,"about_ca_system_score_gemma":0.00411951,"threshold_uncertainty_score":0.041898787},"labels":[],"label_agreement":null},{"id":"W3127461284","doi":"10.26623/ijsp.v1i2.3117","title":"ANALISA KINERJA BUS RAPID TRANSIT (BRT) TRANS SEMARANG KORIDOR II TERMINAL TERBOYO-TERMINAL SISEMUT","year":2020,"lang":"en","type":"article","venue":"Indonesian Journal of Spatial Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Bus rapid transit; Transport engineering; Service (business); Terminal (telecommunication); Service quality; Computer science; Public transport; Telecommunications; Business; Engineering; Marketing","score_opus":0.016194119012787805,"score_gpt":0.2077641390949439,"score_spread":0.1915700200821561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127461284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9741606,0.0003500243,0.0021709942,0.0001243399,0.000023403383,0.00008161692,0.0043884027,0.000042635264,0.01865781],"genre_scores_gemma":[0.9813193,0.0005299535,0.0039850795,0.00002889608,0.0000083697705,0.00008504361,0.0056280503,0.000027113014,0.008388062],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994185,0.00008956865,0.000057627047,0.00009424837,0.00025869667,0.00008142667],"domain_scores_gemma":[0.99916506,0.0001382922,0.00017446214,0.000034946042,0.00041974863,0.00006744935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006641425,0.0004688641,0.00024688966,0.0021767311,0.00037835282,0.0010106566,0.00027131496,0.00020853446,0.003394071],"category_scores_gemma":[0.0010904798,0.00016946309,0.00038996595,0.0033118292,0.00020794258,0.0005174266,0.0004959487,0.00041029902,0.0010424372],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018303639,0.00017885878,0.8965395,0.0005741949,0.000121026984,0.0008691368,0.0034958236,0.0030984667,0.0046868445,0.0019925197,0.0051922174,0.08306836],"study_design_scores_gemma":[0.0000052728024,0.0001738,0.9625457,0.00011447004,0.00007206012,0.0004786347,0.0131419925,0.0037012594,0.0018082659,0.0002090455,0.017728137,0.000021340622],"about_ca_topic_score_codex":0.027532998,"about_ca_topic_score_gemma":0.057809986,"teacher_disagreement_score":0.027532998,"about_ca_system_score_codex":0.0007397739,"about_ca_system_score_gemma":0.0011169077,"threshold_uncertainty_score":0.054745495},"labels":[],"label_agreement":null},{"id":"W3133647532","doi":"10.21009/jmenara.v2i2.7880","title":"IDENTIFIKASI RESIKO INVESTOR DALAM INVESTASI JALAN TOL","year":2007,"lang":"id","type":"article","venue":"Menara Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Business administration; Business; Art","score_opus":0.014194587146562868,"score_gpt":0.2262873988534502,"score_spread":0.21209281170688732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133647532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7402562,0.0037644696,0.007982907,0.0038085824,0.00030527817,0.0004660313,0.007863312,0.00032844246,0.23522489],"genre_scores_gemma":[0.79760814,0.003517921,0.006581951,0.0007489344,0.00009709698,0.00021579041,0.0053507164,0.00007583441,0.18580373],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903464,0.00010960073,0.00006223708,0.00014710169,0.0004311174,0.00021525477],"domain_scores_gemma":[0.9986609,0.00027899578,0.0003254542,0.00009096778,0.00047126517,0.00017236297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012666356,0.0004574537,0.00029521988,0.0015411465,0.0007672814,0.0034594645,0.0004885666,0.00062265707,0.025039205],"category_scores_gemma":[0.0021837105,0.00022111091,0.00029817442,0.0012708234,0.0002637111,0.0010112652,0.0012240234,0.00065314793,0.004936308],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096923957,0.00032597032,0.53563243,0.0009558327,0.0001594186,0.0021077483,0.0044322894,0.001914047,0.02263637,0.013715189,0.039374117,0.37777737],"study_design_scores_gemma":[0.00008657712,0.0007386449,0.44794086,0.00086987496,0.00031764098,0.0013448304,0.015034464,0.0039831153,0.028609777,0.0036454084,0.49733192,0.00009685642],"about_ca_topic_score_codex":0.009779027,"about_ca_topic_score_gemma":0.018082142,"teacher_disagreement_score":0.025039205,"about_ca_system_score_codex":0.0017674513,"about_ca_system_score_gemma":0.002352944,"threshold_uncertainty_score":0.083764434},"labels":[],"label_agreement":null},{"id":"W3136718374","doi":"10.32502/jbearing.3217202064","title":"RENCANA ANGGARAN BIAYA PERENCANAAN PEMBANGUNAN STRUKTUR ATAS JEMBATAN KERETA API PADA PPI MADIUN","year":2020,"lang":"id","type":"article","venue":"Bearing Jurnal Penelitian dan Kajian Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.02309017680404897,"score_gpt":0.20614202520780228,"score_spread":0.18305184840375333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136718374","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4113713,0.02953426,0.00907302,0.0058213198,0.0006271671,0.0004695343,0.0025142059,0.00082978373,0.5397594],"genre_scores_gemma":[0.7200416,0.01654617,0.014010668,0.0013981869,0.0000792703,0.0002787692,0.001799079,0.00023568576,0.24561065],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995635,0.000065533706,0.000022922764,0.000087299864,0.0001349065,0.00012585225],"domain_scores_gemma":[0.99965906,0.000044943827,0.00005670211,0.000038375678,0.00013288253,0.00006806362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004441354,0.0007095598,0.00054164004,0.0009275511,0.0017006918,0.0027851982,0.0006732207,0.00058565405,0.02420789],"category_scores_gemma":[0.00051236316,0.00034936334,0.0004196601,0.0015151997,0.0008084671,0.0009023577,0.0018733337,0.0015003306,0.0049369684],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014014292,0.00058749394,0.047815252,0.0029649022,0.00018566068,0.004377226,0.010901291,0.0009785427,0.1633238,0.020984482,0.022202665,0.7242772],"study_design_scores_gemma":[0.000054198652,0.00044218192,0.106797986,0.00060395396,0.00021056746,0.0022901339,0.014821533,0.00043678988,0.03814793,0.0020673058,0.8340239,0.00010342776],"about_ca_topic_score_codex":0.036333658,"about_ca_topic_score_gemma":0.07869881,"teacher_disagreement_score":0.036333658,"about_ca_system_score_codex":0.0019606415,"about_ca_system_score_gemma":0.0037828635,"threshold_uncertainty_score":0.08098346},"labels":[],"label_agreement":null},{"id":"W3138122640","doi":"10.20527/jiep.v2i3.1200","title":"ANALISIS POTENSI PENERIMAAN RETRIBUSI PELAYANAN PARKIR DI TEPI JALAN UMUM KOTA BANJARMASIN","year":2019,"lang":"en","type":"article","venue":"JIEP Jurnal Ilmu Ekonomi dan Pembangunan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Revenue; Statistics; Transport engineering; Population; Mathematics; Geography; Operations management; Business; Engineering; Finance; Medicine","score_opus":0.00500551045238658,"score_gpt":0.17692893014877217,"score_spread":0.17192341969638558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138122640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99209,0.00046168856,0.00017357404,0.000101148624,0.00001144215,0.000028535449,0.00042363894,0.000010469422,0.006699427],"genre_scores_gemma":[0.9946641,0.00046756785,0.00040710476,0.00003481992,0.000009051919,0.000025472975,0.00065135944,0.0000064895803,0.0037339723],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99960667,0.000060404407,0.000037963295,0.000056277593,0.00016173894,0.00007692191],"domain_scores_gemma":[0.9995264,0.00010040422,0.00014427202,0.000026979216,0.00013782427,0.000064150074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003783058,0.00020465926,0.00019454732,0.0010784082,0.00048349108,0.00088317425,0.0004253693,0.00017660767,0.004885832],"category_scores_gemma":[0.00087190507,0.00012536118,0.00024783256,0.001441148,0.0002806505,0.00047739246,0.0006138102,0.00036660457,0.000565557],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020220153,0.00017084883,0.907375,0.0004758559,0.000099333396,0.002510269,0.010744588,0.00031023208,0.004157311,0.0015318173,0.003102263,0.06932027],"study_design_scores_gemma":[0.0000016859736,0.00005962553,0.97091687,0.000047602764,0.000022335746,0.00094725436,0.016451297,0.0003194035,0.00064813264,0.00009251422,0.010484125,0.000009153695],"about_ca_topic_score_codex":0.009950934,"about_ca_topic_score_gemma":0.028117035,"teacher_disagreement_score":0.009950934,"about_ca_system_score_codex":0.0005049781,"about_ca_system_score_gemma":0.00037169058,"threshold_uncertainty_score":0.019786},"labels":[],"label_agreement":null},{"id":"W3142807085","doi":"10.29103/tj.v11i1.460","title":"ISUE AKSESIBILITAS DAN PENGEMBANGAN WILAYAH SEBAGAI KRITERIA PENENTU PRIORITAS PENINGKATAN JALAN DI KABUPATEN PIDIE JAYA","year":2021,"lang":"id","type":"article","venue":"Teras Jurnal Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics; Forestry; Geography","score_opus":0.015059054565430016,"score_gpt":0.2333942373006229,"score_spread":0.21833518273519287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142807085","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8397121,0.010980344,0.014009027,0.0058114636,0.0005137211,0.001501132,0.01059118,0.00054705254,0.11633398],"genre_scores_gemma":[0.9151535,0.0052528232,0.014978156,0.001173974,0.00010971895,0.00077298254,0.0041193767,0.00011972205,0.05831981],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99644923,0.001040437,0.00023128066,0.0005642222,0.001194152,0.0005206049],"domain_scores_gemma":[0.9957231,0.0013014378,0.0007815806,0.00034431386,0.0013706901,0.00047872934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039097304,0.0006648074,0.00064915576,0.0010590017,0.0011264108,0.003497404,0.00078526593,0.0009444067,0.019028455],"category_scores_gemma":[0.00414098,0.0003782095,0.0009160199,0.0010250605,0.0006552291,0.0013742744,0.0016399691,0.0011247012,0.003152861],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029445272,0.0017261853,0.38939726,0.0041975854,0.0004989189,0.0014708776,0.0078124455,0.0032075488,0.088058695,0.006225347,0.023997338,0.47046325],"study_design_scores_gemma":[0.00010457633,0.004093999,0.62781453,0.0012697455,0.0005583277,0.0011400012,0.023303144,0.0023166703,0.06435903,0.004179,0.27064866,0.00021235304],"about_ca_topic_score_codex":0.01484766,"about_ca_topic_score_gemma":0.027198285,"teacher_disagreement_score":0.019028455,"about_ca_system_score_codex":0.0027646364,"about_ca_system_score_gemma":0.0038238058,"threshold_uncertainty_score":0.06365651},"labels":[],"label_agreement":null},{"id":"W3159132778","doi":"10.18280/mmep.080209","title":"Modelling Trip Distribution Using the Gravity Model and Fratar's Method","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Trip distribution; Gravity model of trade; Distribution (mathematics); Process (computing); Econometrics; Trip generation; Sample (material); Computer science; TRIPS architecture; Transport engineering; Operations research; Mathematics; Engineering; Economics","score_opus":0.03418777253751396,"score_gpt":0.2208673019940571,"score_spread":0.18667952945654315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3159132778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19432148,0.00033482377,0.79082394,0.0004300348,0.000048287024,0.0002125381,0.0009917497,0.00058704475,0.012250096],"genre_scores_gemma":[0.90547377,0.00043479438,0.08707349,0.000039257982,0.000023639237,0.0001946547,0.00068042317,0.000073537994,0.0060065147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995228,0.00016859394,0.00002393,0.00011002218,0.00009663861,0.00007797723],"domain_scores_gemma":[0.99945754,0.0002795058,0.00008096786,0.000043066382,0.00012159828,0.00001720827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007480918,0.000597652,0.00044030356,0.0017124547,0.00041833424,0.000769708,0.0013156001,0.00074556563,0.0026510665],"category_scores_gemma":[0.0023951307,0.00023235539,0.0010422386,0.0016804625,0.00045542658,0.0012060262,0.0006105141,0.0005567186,0.000709237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003333996,0.000026040252,0.01003631,0.00005266786,0.000031966767,0.00013387325,0.00024036247,0.93370235,0.0006391793,0.020601613,0.0011579882,0.03334427],"study_design_scores_gemma":[0.0000046117525,0.000032558004,0.0033501866,0.000011174441,0.000012172641,0.000112052025,0.000100523095,0.9897786,0.00019180952,0.004156274,0.0022328496,0.000017308337],"about_ca_topic_score_codex":0.04457769,"about_ca_topic_score_gemma":0.023208473,"teacher_disagreement_score":0.04457769,"about_ca_system_score_codex":0.0011996815,"about_ca_system_score_gemma":0.00087959407,"threshold_uncertainty_score":0.08863646},"labels":[],"label_agreement":null},{"id":"W3164866512","doi":"","title":"Study of Planning and Management of Good Transport in Rural Areas","year":2020,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Rural area; Business; Distribution (mathematics); Public transport; Public good; Environmental planning; Service (business); Agricultural economics; Geography; Economic growth; Transport engineering; Economics; Engineering; Marketing","score_opus":0.016645640889255357,"score_gpt":0.20738296178744714,"score_spread":0.1907373208981918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3164866512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86254555,0.0021792327,0.019507289,0.0058327494,0.00008711378,0.00059983105,0.00048244663,0.000099619036,0.10866627],"genre_scores_gemma":[0.97958565,0.0019949449,0.0076916856,0.00006581921,0.000014981224,0.00009331451,0.00014566745,0.000011358996,0.010396582],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99950886,0.00023825887,0.000022730646,0.00005429489,0.000073434654,0.00010243282],"domain_scores_gemma":[0.9995121,0.00011572536,0.00009753252,0.000016904814,0.0001276278,0.00013005915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047636282,0.00018593567,0.0001303546,0.00061743654,0.0013301014,0.0014863209,0.0006336325,0.00040602524,0.003118628],"category_scores_gemma":[0.0012133677,0.00018910662,0.00022824887,0.0012259113,0.00044347646,0.0011734589,0.000583586,0.00047733236,0.00029576418],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019049615,0.0014453668,0.23305972,0.0015127119,0.00012340283,0.007054929,0.03537755,0.17713702,0.0066455845,0.107428744,0.02637429,0.4036502],"study_design_scores_gemma":[0.000036043333,0.0014486465,0.32148692,0.00082994276,0.00009781927,0.0012650294,0.28411496,0.11344162,0.0028416363,0.036945198,0.23735213,0.00013998327],"about_ca_topic_score_codex":0.026575418,"about_ca_topic_score_gemma":0.03351769,"teacher_disagreement_score":0.026575418,"about_ca_system_score_codex":0.0020903721,"about_ca_system_score_gemma":0.0049807,"threshold_uncertainty_score":0.052841485},"labels":[],"label_agreement":null},{"id":"W3169577091","doi":"10.26593/jtrans.v21i1.4827.37-44","title":"BANGKITAN DAN TARIKAN PERGERAKAN DI KAWASAN PENDIDIKAN KOTA BANDAR LAMPUNG","year":2021,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Geography; Mathematics; Forestry","score_opus":0.007695378141953879,"score_gpt":0.18976329895570454,"score_spread":0.18206792081375067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169577091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9382427,0.00125157,0.0050958213,0.00086312834,0.00015840643,0.00017831376,0.0011148644,0.00017401575,0.052921347],"genre_scores_gemma":[0.96113086,0.000978283,0.0039406694,0.000069304406,0.000039835533,0.00013355282,0.0006339528,0.000026818585,0.03304662],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99976355,0.000056415618,0.000014917448,0.00004717209,0.000050888877,0.00006706917],"domain_scores_gemma":[0.9996455,0.000059207145,0.00007982737,0.000020028821,0.000102472615,0.00009291559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002893346,0.00042580705,0.00024372477,0.00065350655,0.0010992368,0.0013063947,0.0005401851,0.00034699563,0.022620887],"category_scores_gemma":[0.00031615284,0.00017435387,0.00038071876,0.00080185133,0.00037483493,0.0006123232,0.00089323625,0.00052777765,0.0027784281],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018003928,0.0012891163,0.49136713,0.0025007126,0.00026962813,0.0057053934,0.017114816,0.010305071,0.04004589,0.01367514,0.024142185,0.39178452],"study_design_scores_gemma":[0.00006639976,0.0008622147,0.78365153,0.00049697724,0.00022369245,0.0025065057,0.03933061,0.008593322,0.007610194,0.0034093903,0.15307993,0.00016925385],"about_ca_topic_score_codex":0.010149527,"about_ca_topic_score_gemma":0.02051489,"teacher_disagreement_score":0.022620887,"about_ca_system_score_codex":0.00086910283,"about_ca_system_score_gemma":0.0010473497,"threshold_uncertainty_score":0.075674415},"labels":[],"label_agreement":null},{"id":"W3196026061","doi":"10.30659/pondasi.v26i1.17388","title":"VOLUME LALU LINTAS DAN LEVEL OF SERVICE (LOS) DI KORIDOR JALAN GAJAH MADA KOTA PONTIANAK","year":2021,"lang":"en","type":"article","venue":"Pondasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Traffic volume; Transport engineering; Business; Geography; Engineering","score_opus":0.03208093506907417,"score_gpt":0.217073763279411,"score_spread":0.18499282821033683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196026061","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95983064,0.0007891153,0.0010381117,0.00034454584,0.000070045586,0.000054770444,0.0026833825,0.00012875679,0.035060555],"genre_scores_gemma":[0.9889236,0.00046339014,0.0010147917,0.000023377741,0.00002227892,0.000054635522,0.0013636586,0.000014581112,0.008119703],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994709,0.00006321811,0.000042661977,0.000080318765,0.00023692974,0.00010597447],"domain_scores_gemma":[0.9993586,0.0001533957,0.00014740363,0.000029093695,0.00025092423,0.000060629416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002711691,0.00033974086,0.00019084355,0.0017250511,0.00074125367,0.0017232242,0.00035541505,0.00020649728,0.014669795],"category_scores_gemma":[0.0010143627,0.00012409454,0.00023435424,0.0025022335,0.00035349894,0.00062417454,0.00072851294,0.00040744085,0.0012815667],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049923157,0.000283044,0.6427932,0.0011383966,0.00012022144,0.0020215053,0.011213038,0.0038875986,0.0077520306,0.008150256,0.017350709,0.3047908],"study_design_scores_gemma":[0.000010260089,0.00025173614,0.9165674,0.00019286833,0.000063272964,0.0011187755,0.020887056,0.0020824606,0.0029509165,0.0009851629,0.054827757,0.00006225542],"about_ca_topic_score_codex":0.009067086,"about_ca_topic_score_gemma":0.010754266,"teacher_disagreement_score":0.014669795,"about_ca_system_score_codex":0.0011718565,"about_ca_system_score_gemma":0.0008856551,"threshold_uncertainty_score":0.049075365},"labels":[],"label_agreement":null},{"id":"W3202600165","doi":"10.47329/teknikgradien.v13i1.738","title":"PERENCANAAN PENINGKATAN DAYA DUKUNG PERKERASAN RUNWAY BANDARA INTERNASIONAL I GUSTI NGURAH RAI-BALI","year":2021,"lang":"id","type":"article","venue":"Jurnal Teknik Gradien","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Boeing (Canada)","funders":"","keywords":"Runway; Aeronautics; Physics; Engineering; Geography; Cartography","score_opus":0.013109367572863054,"score_gpt":0.21676324250022957,"score_spread":0.20365387492736653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202600165","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69387805,0.0013464413,0.02618573,0.0014443052,0.0010396745,0.0006277288,0.026736049,0.0072482936,0.24149385],"genre_scores_gemma":[0.76039,0.0015362002,0.024987001,0.00031140976,0.00019196178,0.00042512474,0.031208059,0.0011939777,0.17975622],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915576,0.000051026032,0.000048162718,0.00017951214,0.00043200562,0.0001335983],"domain_scores_gemma":[0.99864906,0.00015057148,0.0001104729,0.00016747093,0.0007659342,0.00015648297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006622899,0.0008053807,0.0005676862,0.0010285862,0.0010289674,0.0021409264,0.000841644,0.000422982,0.03174262],"category_scores_gemma":[0.0011423951,0.0003505223,0.0004949815,0.0013279401,0.0003718687,0.0013580447,0.0011999884,0.0010231473,0.013068872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020977857,0.0006765728,0.20089683,0.0011872599,0.00023273745,0.00060710724,0.0019487649,0.012820609,0.053803727,0.0036988854,0.12868465,0.59334505],"study_design_scores_gemma":[0.00011135344,0.000969954,0.4487537,0.0002340739,0.0002805266,0.00039305977,0.004761213,0.012493094,0.03162954,0.0014600238,0.4986741,0.00023940153],"about_ca_topic_score_codex":0.034315027,"about_ca_topic_score_gemma":0.062938616,"teacher_disagreement_score":0.034315027,"about_ca_system_score_codex":0.001298998,"about_ca_system_score_gemma":0.0019193424,"threshold_uncertainty_score":0.10618967},"labels":[],"label_agreement":null},{"id":"W3202764493","doi":"10.26593/jtrans.v21i2.5160.123-132","title":"KARAKTERISTIK PERGERAKAN PENUMPANG ANGKUTAN UMUM PERDESAAN DI KABUPATEN KUNINGAN","year":2021,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Public transport; Business; Transport engineering; Engineering","score_opus":0.009240646795187315,"score_gpt":0.19086151148852262,"score_spread":0.1816208646933353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202764493","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99328715,0.0008857145,0.0006167174,0.00017032976,0.000037807713,0.000031416115,0.00029484986,0.000018996885,0.004657205],"genre_scores_gemma":[0.9955106,0.000613986,0.0005895814,0.00003225243,0.00000806223,0.000032741777,0.0002118112,0.000008263163,0.0029926868],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998005,0.000035290283,0.000011125697,0.000051581763,0.00004959307,0.000051959258],"domain_scores_gemma":[0.99980456,0.000049939496,0.000045714267,0.000010148049,0.00006470717,0.000024902436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003054028,0.0005366374,0.00046174583,0.0008443422,0.00088179816,0.0013778158,0.00031141375,0.0003830808,0.007676811],"category_scores_gemma":[0.00044448586,0.00024631174,0.0004329642,0.0008434416,0.000722216,0.00041291738,0.0008089025,0.00051629957,0.0007564649],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018227939,0.0006089281,0.71220565,0.001136594,0.00031688053,0.031491715,0.025578178,0.003208543,0.0506465,0.0032823014,0.0042092483,0.1654927],"study_design_scores_gemma":[0.00002680175,0.00038235952,0.9152839,0.00031468822,0.00020350677,0.009655345,0.041415296,0.0035938954,0.0045883404,0.0027727792,0.021697093,0.00006588958],"about_ca_topic_score_codex":0.0086563425,"about_ca_topic_score_gemma":0.009351233,"teacher_disagreement_score":0.0086563425,"about_ca_system_score_codex":0.0004139918,"about_ca_system_score_gemma":0.0006201781,"threshold_uncertainty_score":0.025681496},"labels":[],"label_agreement":null},{"id":"W3207661401","doi":"10.21776/ub.takoda.2020.012.01.3","title":"Faktor-faktor Yang Mempengaruhi Preferensi Masyarakat Dalam Menggunakan Moda Mass Rapid Transit (MRT) Kota Jakarta","year":2020,"lang":"id","type":"article","venue":"Jurnal Perencanaan Kota dan Daerah/Jurnal Tata Kota dan Daerah","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics; Physics; Business administration; Business","score_opus":0.025313852849005652,"score_gpt":0.21146803022252392,"score_spread":0.18615417737351828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207661401","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6563851,0.025070898,0.007702719,0.012567044,0.0011925097,0.0005191294,0.00812702,0.0004956868,0.28793988],"genre_scores_gemma":[0.8858375,0.012519155,0.0044087013,0.0011155392,0.00022804129,0.00023239602,0.002342852,0.00007697286,0.09323889],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988709,0.0002970032,0.00010770066,0.00017835434,0.00032359274,0.00022243724],"domain_scores_gemma":[0.99846566,0.00050332514,0.0002882042,0.00012804862,0.00037149002,0.00024332957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010785589,0.0005573542,0.00062035903,0.00095386984,0.0017377151,0.004178006,0.00052269717,0.00068827113,0.041643538],"category_scores_gemma":[0.0026605937,0.00027071184,0.0005192353,0.0013594766,0.0006287864,0.0016454896,0.0013133278,0.001021878,0.0070325797],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013091718,0.0008404172,0.28161973,0.0032455695,0.00038717152,0.0026870586,0.005470682,0.0011414293,0.008417772,0.01675911,0.06184845,0.61627346],"study_design_scores_gemma":[0.00010159452,0.000688808,0.4399047,0.0013785207,0.00049210317,0.004778932,0.01957272,0.0020366185,0.0081288805,0.006320197,0.5163485,0.00024853088],"about_ca_topic_score_codex":0.012929257,"about_ca_topic_score_gemma":0.0207354,"teacher_disagreement_score":0.041643538,"about_ca_system_score_codex":0.0015696632,"about_ca_system_score_gemma":0.0027677445,"threshold_uncertainty_score":0.13931149},"labels":[],"label_agreement":null},{"id":"W3211224747","doi":"10.33087/civronlit.v6i2.86","title":"Analisa Efektivitas Penerapan Jalur Khusus Sepeda Di Kota Palembang Pada Rute Jakabaring Sport City – BKB","year":2021,"lang":"id","type":"article","venue":"Jurnal Civronlit Unbari","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Humanities; Physics; Psychology; Art","score_opus":0.016374334412570808,"score_gpt":0.2233160659715464,"score_spread":0.2069417315589756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211224747","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93254566,0.021937508,0.0016710191,0.0021346617,0.00018417127,0.00046184144,0.021338759,0.0001022371,0.019624067],"genre_scores_gemma":[0.9668433,0.006193753,0.0018368248,0.00051343633,0.000052300722,0.00044420184,0.006493821,0.000040431598,0.017581942],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991296,0.00022545962,0.000074364994,0.00013043078,0.0002641519,0.00017605643],"domain_scores_gemma":[0.9988317,0.0004153541,0.00023646455,0.000047605048,0.00034159332,0.00012727216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009989695,0.00056523446,0.0006074688,0.0014242213,0.0005653018,0.0014116357,0.00041156294,0.00053778436,0.011515469],"category_scores_gemma":[0.00224396,0.00023422201,0.0010406268,0.0018251158,0.000335151,0.00040529147,0.00077096734,0.00090772053,0.0014420933],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034762744,0.00058148475,0.77152044,0.005718621,0.0012774249,0.0012365568,0.0035486363,0.0010795273,0.0095929755,0.000849084,0.013440996,0.18767796],"study_design_scores_gemma":[0.000053589487,0.00078665785,0.95983464,0.0008012488,0.00068199,0.0004682124,0.004829689,0.00034483182,0.0021093625,0.0002796344,0.02977649,0.00003355256],"about_ca_topic_score_codex":0.05437221,"about_ca_topic_score_gemma":0.09221338,"teacher_disagreement_score":0.05437221,"about_ca_system_score_codex":0.0010572744,"about_ca_system_score_gemma":0.0017623679,"threshold_uncertainty_score":0.1081115},"labels":[],"label_agreement":null},{"id":"W3212424190","doi":"10.5267/j.ijdns.2021.9.019","title":"Determinants of airport train operational performance","year":2021,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Transport engineering; Service quality; Headway; Loyalty; Train; Customer satisfaction; LISREL; Service (business); Structural equation modeling; Quality (philosophy); Tariff; Business; Loyalty business model; Engineering; Marketing; Computer science; Geography","score_opus":0.02243022059615999,"score_gpt":0.26992557606170564,"score_spread":0.24749535546554566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212424190","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9952773,0.000031412965,0.00027825742,0.000078341545,0.0000033548342,0.00000844706,0.00012602496,0.0000074983404,0.004189544],"genre_scores_gemma":[0.9996718,0.00001525135,0.000048131424,0.000004178766,0.0000018750368,0.0000017232398,0.00007047602,9.97486e-7,0.00018559795],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993542,0.000134949,0.000060023227,0.00005698004,0.00019366978,0.00020007667],"domain_scores_gemma":[0.99736494,0.0005792844,0.0008867701,0.00008882623,0.000487442,0.0005928139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047296917,0.00019272229,0.00013686514,0.00063146127,0.00033189158,0.001158345,0.00020934128,0.00022123576,0.0032278923],"category_scores_gemma":[0.002651667,0.00007763214,0.0002504954,0.0010268326,0.0003802543,0.00051071314,0.0004513614,0.0005367328,0.0004081834],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036100944,0.00023778933,0.98587704,0.00003046105,0.000044379733,0.00016759105,0.00061322784,0.0016440685,0.00069309125,0.0006712006,0.00035236683,0.009632692],"study_design_scores_gemma":[0.0000011595553,0.00007408843,0.9957223,0.000009125455,0.000010221594,0.000049743318,0.0017167167,0.0017076787,0.00014614867,0.00007623567,0.00048058224,0.0000059339427],"about_ca_topic_score_codex":0.013215308,"about_ca_topic_score_gemma":0.010882308,"teacher_disagreement_score":0.013215308,"about_ca_system_score_codex":0.0005849704,"about_ca_system_score_gemma":0.0005955325,"threshold_uncertainty_score":0.026276767},"labels":[],"label_agreement":null},{"id":"W3215719237","doi":"10.33701/jipsk.v6i2.1901","title":"PERKEMBANGAN INDUSTRI PENERBANGAN DAN PERTUMBUHAN EKONOMI DI INDONESIA","year":2021,"lang":"id","type":"article","venue":"Jurnal Ilmu Pemerintahan Suara Khatulistiwa","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.016680749870797425,"score_gpt":0.21997887164624066,"score_spread":0.20329812177544324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215719237","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76281464,0.011063378,0.0068697818,0.003590109,0.00036852402,0.00024247327,0.0074196467,0.00033399556,0.2072973],"genre_scores_gemma":[0.9128628,0.0063160425,0.005248197,0.00040451766,0.000060388797,0.00024659233,0.002917317,0.000082011284,0.07186213],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995035,0.000080557504,0.000052253163,0.000096490134,0.000172728,0.000094416704],"domain_scores_gemma":[0.9992386,0.00017839123,0.00014457478,0.00006403046,0.00027044304,0.000103991195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058452395,0.000521921,0.00045287627,0.0010827596,0.0010138511,0.002719654,0.0004244557,0.00031025152,0.010647516],"category_scores_gemma":[0.0010900073,0.0003292186,0.00033564473,0.0023121997,0.00045816723,0.0012460343,0.0011340297,0.0009245556,0.002726398],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050233264,0.0005374825,0.46577987,0.0028358772,0.00028919618,0.0022567136,0.01018729,0.0025657583,0.0061166915,0.013856437,0.03469137,0.4603809],"study_design_scores_gemma":[0.00003676101,0.00017588548,0.7479819,0.0008399866,0.00022035812,0.0011574185,0.017168408,0.0018637284,0.0046726866,0.002388639,0.22342403,0.00007021936],"about_ca_topic_score_codex":0.025682334,"about_ca_topic_score_gemma":0.042612202,"teacher_disagreement_score":0.025682334,"about_ca_system_score_codex":0.0016522857,"about_ca_system_score_gemma":0.0031726495,"threshold_uncertainty_score":0.051065683},"labels":[],"label_agreement":null},{"id":"W3217100406","doi":"10.46491/jptc.v1i2.592","title":"Perbaikan Jalan di Kelurahan Siwalankerto Kecamatan Wonocolo Kota Surabaya","year":2021,"lang":"id","type":"article","venue":"Journal of Public Transportation Community","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.03553112844479306,"score_gpt":0.2394654507599529,"score_spread":0.20393432231515984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217100406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5836276,0.0019005957,0.021738308,0.0016456852,0.0005374334,0.002148344,0.0042411946,0.00213496,0.38202593],"genre_scores_gemma":[0.59168404,0.0025022267,0.037553754,0.00045674658,0.00006135465,0.0011563753,0.0033044484,0.000851537,0.36242947],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99883705,0.00017000188,0.000059663183,0.00017485235,0.00057203975,0.00018644203],"domain_scores_gemma":[0.99765575,0.00048364323,0.00016059655,0.00028700285,0.0011120624,0.000300948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013679366,0.00070029014,0.0005576937,0.0008689198,0.0018716931,0.0028664214,0.00064121746,0.0007025345,0.05348863],"category_scores_gemma":[0.0020206673,0.00045724487,0.0006650146,0.00080205227,0.00062632875,0.0019339978,0.0015331965,0.0012380041,0.009685133],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039817337,0.0032063804,0.05950213,0.0036028048,0.00019059371,0.0011910449,0.01066679,0.0052980105,0.2799173,0.014271123,0.033746168,0.5844259],"study_design_scores_gemma":[0.00017318496,0.0044118087,0.16990836,0.0007923939,0.00041949007,0.0008482123,0.016437251,0.0040549077,0.17743677,0.0038056935,0.6214998,0.00021208261],"about_ca_topic_score_codex":0.015309488,"about_ca_topic_score_gemma":0.03634139,"teacher_disagreement_score":0.05348863,"about_ca_system_score_codex":0.0023127387,"about_ca_system_score_gemma":0.0044365297,"threshold_uncertainty_score":0.17893726},"labels":[],"label_agreement":null},{"id":"W4200621502","doi":"10.18280/jesa.540603","title":"Reduce Carbon Emissions of Logistic Transportation Using Eight Steps Approach in Indonesian Automotive Industry","year":2021,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Automotive industry; Greenhouse gas; Business; Air quality index; Air pollution; Environmental economics; Environmental science; Natural resource economics; Engineering; Economics","score_opus":0.033865321756353026,"score_gpt":0.25399643852391107,"score_spread":0.22013111676755803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200621502","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9101755,0.00065000507,0.056753855,0.0019159467,0.000035446978,0.0012556982,0.00014902516,0.000066800574,0.028997622],"genre_scores_gemma":[0.8875854,0.00079141755,0.10477138,0.00019015244,0.0000036730169,0.0006164189,0.000099960576,0.00001049117,0.005931037],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988285,0.00071293744,0.000050006587,0.000094459894,0.0001921002,0.00012204566],"domain_scores_gemma":[0.99939704,0.0003021808,0.0000721025,0.000021729957,0.00017238873,0.000034544093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013621703,0.0004619479,0.00023934797,0.0012634167,0.0011042235,0.001190267,0.00069906935,0.00066420704,0.0019605462],"category_scores_gemma":[0.001249963,0.00021666715,0.0005976264,0.00096497545,0.00072383287,0.00075659755,0.0010286306,0.00053934957,0.00013693434],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008147934,0.0043627517,0.08502488,0.0054015727,0.00032029842,0.0024525353,0.03452192,0.09781281,0.03600313,0.061362408,0.0044581876,0.6674648],"study_design_scores_gemma":[0.00048600865,0.0063347006,0.21257488,0.0029664605,0.0009941983,0.0013046683,0.18158159,0.31912893,0.12294782,0.06784353,0.08338969,0.00044748795],"about_ca_topic_score_codex":0.009635759,"about_ca_topic_score_gemma":0.024416756,"teacher_disagreement_score":0.009635759,"about_ca_system_score_codex":0.0029091642,"about_ca_system_score_gemma":0.004815311,"threshold_uncertainty_score":0.021107614},"labels":[],"label_agreement":null},{"id":"W4205727129","doi":"10.31227/osf.io/ws8kb","title":"ANALISIS KARAKTERISTIK KEBUTUHAN RUANG PARKIR","year":2019,"lang":"id","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hotel Dieu Hospital","funders":"","keywords":"Humanities; Physics; Mathematics; Art","score_opus":0.011554649644590666,"score_gpt":0.20373635301375242,"score_spread":0.19218170336916177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205727129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9754944,0.0009020552,0.0034357393,0.00020383073,0.000033208195,0.0000850812,0.0032919084,0.00008241038,0.016471352],"genre_scores_gemma":[0.986819,0.0005478269,0.0024065014,0.000025107367,0.000006823324,0.00005434742,0.0013512644,0.000051433024,0.008737646],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99917233,0.00015861292,0.00005365655,0.00017934914,0.00029208235,0.00014411863],"domain_scores_gemma":[0.99806446,0.0007073236,0.00022467627,0.00017496973,0.00071050524,0.00011807157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007786123,0.00044451555,0.00057537126,0.0016783478,0.0008730137,0.0026712436,0.00041318196,0.00042177868,0.013910482],"category_scores_gemma":[0.0026940552,0.0002716548,0.0006019212,0.0030022399,0.00056665257,0.0010634369,0.0010158176,0.0006187862,0.0022850165],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012820787,0.00034330037,0.78833973,0.0015478195,0.00047216684,0.0022567026,0.013697362,0.004447417,0.03713362,0.005747692,0.005695756,0.1390363],"study_design_scores_gemma":[0.000014481293,0.00022849301,0.92254233,0.00020498766,0.00023041293,0.0010427793,0.032792192,0.0043814736,0.011513371,0.0029961446,0.023970414,0.00008293861],"about_ca_topic_score_codex":0.017751092,"about_ca_topic_score_gemma":0.025958786,"teacher_disagreement_score":0.017751092,"about_ca_system_score_codex":0.00065556384,"about_ca_system_score_gemma":0.0009841673,"threshold_uncertainty_score":0.046535194},"labels":[],"label_agreement":null},{"id":"W4206703045","doi":"10.31219/osf.io/tsj6k","title":"ANALISIS KARAKTERISTIK KEBUTUHAN RUANG PARKIR","year":2019,"lang":"id","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hotel Dieu Hospital","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.011554649644590666,"score_gpt":0.20373635301375242,"score_spread":0.19218170336916177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206703045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9754944,0.0009020552,0.0034357393,0.00020383073,0.000033208195,0.0000850812,0.0032919084,0.00008241038,0.016471352],"genre_scores_gemma":[0.986819,0.0005478269,0.0024065014,0.000025107367,0.000006823324,0.00005434742,0.0013512644,0.000051433024,0.008737646],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99917233,0.00015861292,0.00005365655,0.00017934914,0.00029208235,0.00014411863],"domain_scores_gemma":[0.99806446,0.0007073236,0.00022467627,0.00017496973,0.00071050524,0.00011807157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007786123,0.00044451555,0.00057537126,0.0016783478,0.0008730137,0.0026712436,0.00041318196,0.00042177868,0.013910482],"category_scores_gemma":[0.0026940552,0.0002716548,0.0006019212,0.0030022399,0.00056665257,0.0010634369,0.0010158176,0.0006187862,0.0022850165],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012820787,0.00034330037,0.78833973,0.0015478195,0.00047216684,0.0022567026,0.013697362,0.004447417,0.03713362,0.005747692,0.005695756,0.1390363],"study_design_scores_gemma":[0.000014481293,0.00022849301,0.92254233,0.00020498766,0.00023041293,0.0010427793,0.032792192,0.0043814736,0.011513371,0.0029961446,0.023970414,0.00008293861],"about_ca_topic_score_codex":0.017751092,"about_ca_topic_score_gemma":0.025958786,"teacher_disagreement_score":0.017751092,"about_ca_system_score_codex":0.00065556384,"about_ca_system_score_gemma":0.0009841673,"threshold_uncertainty_score":0.046535194},"labels":[],"label_agreement":null},{"id":"W4206878060","doi":"10.35718/specta.v5i3.388","title":"Isu Strategis Terkait Transportasi dalam Pengembangan Perencanaan Pembangunan Ibu Kota Negara (IKN) Baru","year":2021,"lang":"id","type":"article","venue":"SPECTA Journal of Technology","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.007834546257115873,"score_gpt":0.20685110733042245,"score_spread":0.19901656107330656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206878060","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15009177,0.029234381,0.06080865,0.034159504,0.0023307214,0.00060716306,0.0012507103,0.0005070116,0.72101],"genre_scores_gemma":[0.7171495,0.04861157,0.03245432,0.0022814043,0.0004966485,0.00039977377,0.0009277616,0.0002632226,0.1974159],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99845374,0.00045888056,0.000099781,0.00023392956,0.00046917252,0.0002845515],"domain_scores_gemma":[0.9978325,0.00087295903,0.00020901256,0.00018711873,0.0006208774,0.00027750203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022854882,0.0009760304,0.0007108702,0.0020592972,0.0031240403,0.011754429,0.0012370263,0.0020017999,0.027527107],"category_scores_gemma":[0.003109555,0.00049256225,0.00097590685,0.003143063,0.0020269407,0.006943095,0.0033689716,0.0022844381,0.0064985966],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004282307,0.0006317901,0.03405687,0.0056844647,0.0002810714,0.0018000916,0.014079323,0.013949046,0.011285397,0.3599715,0.071918555,0.4859138],"study_design_scores_gemma":[0.000038991217,0.00043771224,0.023411764,0.0031920518,0.00035025598,0.0011769154,0.066944726,0.01342678,0.009735362,0.085164055,0.7959173,0.00020416341],"about_ca_topic_score_codex":0.014959742,"about_ca_topic_score_gemma":0.025097527,"teacher_disagreement_score":0.027527107,"about_ca_system_score_codex":0.006043886,"about_ca_system_score_gemma":0.009452996,"threshold_uncertainty_score":0.09208733},"labels":[],"label_agreement":null},{"id":"W4220762648","doi":"10.18280/ijsdp.170113","title":"Development of Sustainable Urban Railway Service Model Using Micmac-Mactor: A Case Study in Jabodetabek Mega-Region Indonesia","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Lembaga Pengelola Dana Pendidikan","keywords":"Sustainability; Business; Train; Service (business); Transport engineering; Environmental economics; Environmental planning; Marketing; Engineering; Geography; Economics","score_opus":0.024015871340523028,"score_gpt":0.24501657944224092,"score_spread":0.2210007081017179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220762648","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9793634,0.00007938253,0.0060904063,0.0003469511,0.0000056181316,0.00012708976,0.00012750836,0.00002174144,0.013837979],"genre_scores_gemma":[0.9915632,0.00012297508,0.005969053,0.000016168184,0.0000012725413,0.00007558536,0.00008460817,0.0000062169506,0.002160935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996001,0.00023389347,0.000017017352,0.000034932596,0.000039297767,0.00007467597],"domain_scores_gemma":[0.9996364,0.00019327163,0.000043316806,0.000025277172,0.000052488824,0.000049362185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007052046,0.00032894785,0.0002025869,0.00070182886,0.0013629067,0.0015082009,0.00088085217,0.000754452,0.002714979],"category_scores_gemma":[0.0007728796,0.00022204577,0.00039479142,0.0011277335,0.00075283827,0.0011494189,0.0011782146,0.00070146145,0.00018271593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051077845,0.0026382895,0.2995059,0.0008405867,0.00012514376,0.04720928,0.04027488,0.33559835,0.004998903,0.14849345,0.006701432,0.11310305],"study_design_scores_gemma":[0.000083967025,0.0004564431,0.05223538,0.0002382586,0.00010822683,0.0021221263,0.1302193,0.77885777,0.0025428883,0.008681592,0.02437518,0.00007890809],"about_ca_topic_score_codex":0.042957034,"about_ca_topic_score_gemma":0.07514379,"teacher_disagreement_score":0.042957034,"about_ca_system_score_codex":0.003334911,"about_ca_system_score_gemma":0.0021892365,"threshold_uncertainty_score":0.08541399},"labels":[],"label_agreement":null},{"id":"W4220813267","doi":"10.35957/jatisi.v9i1.1980","title":"Adopsi IoT Pada Core Process Trucking di Indonesia Dengan Menggunakan TOGAF Framework","year":2022,"lang":"id","type":"article","venue":"JATISI (Jurnal Teknik Informatika dan Sistem Informasi)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business; Business administration; Computer science","score_opus":0.014264779808256548,"score_gpt":0.2304452111266551,"score_spread":0.21618043131839854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220813267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07882344,0.002871323,0.6364923,0.0034343123,0.00074034947,0.0016041711,0.0018579239,0.042159416,0.23201679],"genre_scores_gemma":[0.4996125,0.0027938907,0.32699135,0.0012315115,0.00012827724,0.0012295998,0.0052498686,0.0032003168,0.15956268],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99894613,0.0001055224,0.000081620434,0.00022132212,0.00036281836,0.000282586],"domain_scores_gemma":[0.9994141,0.000077960416,0.000036915702,0.00013339701,0.00021577027,0.00012185918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013433595,0.0008989058,0.00047529174,0.00093317195,0.0012865008,0.0041365894,0.001253504,0.001105613,0.009235962],"category_scores_gemma":[0.0011029363,0.00042416388,0.0010993446,0.00067602354,0.0006674023,0.0038677335,0.0026323525,0.0018055753,0.0048301504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010455635,0.0011381622,0.013987083,0.0012828507,0.00013621387,0.0020560632,0.0043985373,0.012465267,0.060894467,0.14292473,0.063290045,0.696381],"study_design_scores_gemma":[0.00010372717,0.00035865084,0.009412556,0.0004507897,0.00019470317,0.0015007642,0.0028861272,0.08287458,0.049393456,0.026404636,0.82625765,0.00016232367],"about_ca_topic_score_codex":0.012133514,"about_ca_topic_score_gemma":0.01025633,"teacher_disagreement_score":0.012133514,"about_ca_system_score_codex":0.0016199419,"about_ca_system_score_gemma":0.0043738936,"threshold_uncertainty_score":0.03089732},"labels":[],"label_agreement":null},{"id":"W4223542939","doi":"10.1108/s2040-726220220000026026","title":"Index","year":2022,"lang":"en","type":"paratext","venue":"Community, environment and disaster risk management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Index (typography)","score_opus":0.00980127273016471,"score_gpt":0.1848943820132632,"score_spread":0.17509310928309849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223542939","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00049086334,0.004373336,0.0017301549,0.00637623,0.021260452,0.00032963854,0.029382564,0.0039556157,0.9321012],"genre_scores_gemma":[0.0018382862,0.003495156,0.001259939,0.0025841403,0.002727322,0.00021661348,0.023966162,0.0013894712,0.962523],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980229,0.00016780943,0.0001898616,0.0003728949,0.0010386433,0.00020782734],"domain_scores_gemma":[0.99630404,0.00026099163,0.00014376249,0.0005372896,0.0022115617,0.0005423569],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013193206,0.0019567357,0.0014302786,0.005488288,0.0023196074,0.011749477,0.0023149147,0.0028939217,0.76500773],"category_scores_gemma":[0.0067273756,0.00064369757,0.0013472013,0.0079879,0.00080644933,0.008118144,0.0040429095,0.0024411343,0.8048839],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011604871,0.000012928675,0.00012293144,0.00018023215,0.0000031045777,0.000020386753,0.000026770676,0.00002671281,0.00010078974,0.0025405127,0.9376701,0.05928391],"study_design_scores_gemma":[0.0000024170595,0.000005968933,0.00020353412,0.000085803455,0.0000014812604,0.00003315898,0.00003242173,0.00001989559,0.00004780311,0.0007119268,0.99885035,0.0000053381013],"about_ca_topic_score_codex":0.00591745,"about_ca_topic_score_gemma":0.005944759,"teacher_disagreement_score":0.23499227,"about_ca_system_score_codex":0.002273468,"about_ca_system_score_gemma":0.003892021,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4224249008","doi":"10.1088/1742-6596/2239/1/011001","title":"Preface to AAME 2022","year":2022,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); China; Political science; Library science; Work (physics); Face (sociological concept); Public relations; Engineering; Sociology; Law; Computer science; Medicine","score_opus":0.01227333929400226,"score_gpt":0.1940585208190932,"score_spread":0.18178518152509093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224249008","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008637649,0.007257444,0.0037609583,0.028530622,0.5130894,0.000816786,0.010361696,0.0019903353,0.43332908],"genre_scores_gemma":[0.004348035,0.004323698,0.0018684984,0.0055785193,0.07719763,0.00061824115,0.0071268883,0.001259812,0.8976787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973169,0.0003548359,0.00023034288,0.00024217895,0.00162862,0.00022717718],"domain_scores_gemma":[0.9832712,0.001713633,0.00069167337,0.00085435965,0.010795376,0.002673755],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0033454243,0.0012591454,0.00089618115,0.0043936046,0.0028505237,0.00957866,0.0015930914,0.002353899,0.46755594],"category_scores_gemma":[0.01806558,0.00042521584,0.0007293119,0.0028437236,0.0005666062,0.0040328223,0.0026242964,0.0033188974,0.37285367],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024157538,0.000013793249,0.000027189686,0.00009020735,0.0000010812737,0.000026639264,0.000017105756,0.000031732747,0.00011080624,0.0008882393,0.98356426,0.015204754],"study_design_scores_gemma":[0.0000030216938,0.000009039283,0.00017731059,0.0000845464,6.750037e-7,0.00003100997,0.000025710156,0.000023869614,0.000057159017,0.00034103278,0.9992422,0.0000043802083],"about_ca_topic_score_codex":0.0022719684,"about_ca_topic_score_gemma":0.0028401506,"teacher_disagreement_score":0.46755594,"about_ca_system_score_codex":0.0020509125,"about_ca_system_score_gemma":0.0035923787,"threshold_uncertainty_score":0.7594668},"labels":[],"label_agreement":null},{"id":"W4225136409","doi":"10.18280/ijsse.120202","title":"A System Dynamics Model of Urban Railway Demand Prediction for Safety and Security Improvement: Lessons Learned from Indonesian Railway Network","year":2022,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Lembaga Pengelola Dana Pendidikan","keywords":"Indonesian; Transport engineering; Railway system; System dynamics; Computer science; Engineering; Artificial intelligence","score_opus":0.008352845736271305,"score_gpt":0.19769473940838794,"score_spread":0.18934189367211662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225136409","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.729143,0.0011897609,0.2233331,0.0034635952,0.00021447445,0.00015058434,0.0025365169,0.00049284997,0.039476115],"genre_scores_gemma":[0.99046504,0.00029613447,0.0044268942,0.00005018742,0.000022014181,0.000067885776,0.00040447497,0.000020247599,0.004247029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999816,0.00005667906,0.000010607614,0.00005215985,0.00002621924,0.00003837182],"domain_scores_gemma":[0.99951494,0.000271788,0.00006424399,0.000013242952,0.00010741856,0.000028358176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005010926,0.0006177029,0.00060561433,0.00032801245,0.00048749498,0.0012472484,0.0006745109,0.0008647013,0.0029266332],"category_scores_gemma":[0.0012512173,0.00030956633,0.00061092415,0.00037188304,0.0003887943,0.00074173737,0.0006082533,0.0010688605,0.00030532127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003390572,0.000034541787,0.005518415,0.000044326654,0.000027326187,0.00016550043,0.00010242781,0.98515725,0.00031565997,0.0040783384,0.0008403274,0.0036820953],"study_design_scores_gemma":[0.000003171089,0.0000068689674,0.00089942775,0.000004368147,0.0000056299214,0.000006353538,0.000029583647,0.99819416,0.000028631346,0.0005659662,0.00025163396,0.0000043588634],"about_ca_topic_score_codex":0.07548446,"about_ca_topic_score_gemma":0.03180279,"teacher_disagreement_score":0.07548446,"about_ca_system_score_codex":0.0011666785,"about_ca_system_score_gemma":0.0014192159,"threshold_uncertainty_score":0.15009016},"labels":[],"label_agreement":null},{"id":"W4225137613","doi":"10.18280/ijsse.120211","title":"Global Warming Potential from Public Transportation Activities During COVID-19 Pandemic in Jakarta, Indonesia","year":2022,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Carbon footprint; Occupancy; Public transport; Greenhouse gas; Coronavirus disease 2019 (COVID-19); Transport engineering; Business; Government (linguistics); Pandemic; Environmental science; Environmental economics; Engineering; Civil engineering; Economics","score_opus":0.007182083002034241,"score_gpt":0.20894792814315738,"score_spread":0.20176584514112314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225137613","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99324185,0.00035312245,0.00022052636,0.00027068175,0.00002092605,0.000015642188,0.00083597586,0.000008699699,0.005032474],"genre_scores_gemma":[0.99871624,0.00024641305,0.000095670766,0.00003121032,0.000006049953,0.000010256886,0.0002704177,0.0000025213221,0.00062121195],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998716,0.000031382937,0.00001059508,0.000016358481,0.000028141143,0.00004184605],"domain_scores_gemma":[0.9998653,0.000032843694,0.00003699441,0.0000045106813,0.000039190807,0.000021117814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017677649,0.000236483,0.00017440841,0.00041185436,0.00040425212,0.0011473818,0.00017257239,0.0003099532,0.0012698433],"category_scores_gemma":[0.00023483021,0.00012067265,0.00027157195,0.0006012898,0.00023751568,0.00045137707,0.0004668518,0.00040878775,0.00019460652],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033118913,0.00024467072,0.95203274,0.00030474048,0.00011883565,0.003436003,0.0017025337,0.010209894,0.00701309,0.0009528914,0.0018757597,0.021777706],"study_design_scores_gemma":[0.0000061083233,0.00007341934,0.9822918,0.00006220064,0.000067414956,0.00038595815,0.0069615166,0.0060911053,0.0019116658,0.0003562308,0.001769574,0.000023065239],"about_ca_topic_score_codex":0.046419874,"about_ca_topic_score_gemma":0.06768908,"teacher_disagreement_score":0.046419874,"about_ca_system_score_codex":0.0011310978,"about_ca_system_score_gemma":0.0008475371,"threshold_uncertainty_score":0.09229934},"labels":[],"label_agreement":null},{"id":"W4225726173","doi":"10.35718/specta.v5i3.373","title":"Peran Kebijakan dalam Peningkatan Performa Layanan BRT Transjakarta","year":2021,"lang":"en","type":"article","venue":"SPECTA Journal of Technology","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Bus rapid transit; Public transport; Business; Developing country; Transport engineering; Service (business); Service quality; Environmental economics; Economic growth; Marketing; Engineering; Economics","score_opus":0.0032356309543599233,"score_gpt":0.17209356203431422,"score_spread":0.1688579310799543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225726173","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4490155,0.010489323,0.0061676265,0.0065102377,0.0010585522,0.0002523434,0.0025230958,0.00040926773,0.52357405],"genre_scores_gemma":[0.7860276,0.0074134823,0.004636941,0.00054457434,0.00006510688,0.00014830068,0.0013953294,0.00013189935,0.19963673],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99964774,0.00005320624,0.000024778858,0.00006469764,0.0000962895,0.00011325503],"domain_scores_gemma":[0.99958104,0.00009098996,0.000051589228,0.000039772523,0.00015982262,0.00007683607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053828955,0.0005019227,0.00035491533,0.00074538944,0.0025099947,0.004215478,0.0004230423,0.0005635147,0.030907074],"category_scores_gemma":[0.00083643856,0.00027767385,0.00027631645,0.0012226204,0.0008615478,0.0011876588,0.0018469627,0.0010949267,0.005322624],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001099004,0.00090800703,0.104486264,0.003572283,0.0001520806,0.008811426,0.024795938,0.0069613573,0.022188269,0.26963323,0.07372379,0.4836684],"study_design_scores_gemma":[0.00002431886,0.00015475777,0.07877952,0.0009442342,0.00009889819,0.002976846,0.025057964,0.0016980898,0.0076895207,0.006180186,0.8762999,0.00009581356],"about_ca_topic_score_codex":0.024249524,"about_ca_topic_score_gemma":0.055156615,"teacher_disagreement_score":0.030907074,"about_ca_system_score_codex":0.0030798845,"about_ca_system_score_gemma":0.0066450746,"threshold_uncertainty_score":0.10339445},"labels":[],"label_agreement":null},{"id":"W4235994062","doi":"10.31227/osf.io/n849y","title":"HUBUNGAN ANTARA PERSEPSI, SIKAP DAN KENYAMANAN MASYARAKAT DENGAN KUALITAS LINGKUNGAN SOSIAL DI SEKITAR KEBERADAAN GARDU DISTRIBUSI TEGANGAN MENENGAH","year":2017,"lang":"id","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.020615838475911724,"score_gpt":0.24315620872347576,"score_spread":0.22254037024756404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235994062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6963163,0.02577535,0.014157725,0.0071754185,0.0008130799,0.0006631242,0.004728923,0.0006198296,0.24975024],"genre_scores_gemma":[0.7793078,0.012672692,0.012303339,0.0015185353,0.00014273504,0.0003102057,0.0022522341,0.00015025372,0.19134223],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994917,0.000098656754,0.000037027665,0.00011276049,0.00015224605,0.00010748739],"domain_scores_gemma":[0.9993445,0.00015485914,0.00012441882,0.00006712634,0.0002357434,0.00007328727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062879483,0.0006355304,0.00061211805,0.0008976096,0.0014548815,0.0025913971,0.00050247874,0.0007981768,0.032149833],"category_scores_gemma":[0.0009807723,0.00040881737,0.0004967601,0.001359272,0.00075776613,0.0016034753,0.0014173993,0.0010125793,0.0063708285],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023043,0.00063031656,0.15298621,0.005443337,0.0004988779,0.0055509806,0.013890725,0.0010746288,0.18849054,0.016830835,0.023124602,0.58917475],"study_design_scores_gemma":[0.00013408157,0.0015681002,0.2917749,0.0012751002,0.00040271258,0.0043802387,0.029081427,0.00078236207,0.06300489,0.0073189232,0.60009164,0.00018558411],"about_ca_topic_score_codex":0.007973834,"about_ca_topic_score_gemma":0.022023825,"teacher_disagreement_score":0.032149833,"about_ca_system_score_codex":0.0011137235,"about_ca_system_score_gemma":0.0019309674,"threshold_uncertainty_score":0.10755187},"labels":[],"label_agreement":null},{"id":"W4241110173","doi":"10.32920/ryerson.14653071.v1","title":"Geometric design of single-lane roundabouts for optimum consistency and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Roundabout; Geometric design; Consistency (knowledge bases); Path (computing); Intersection (aeronautics); Design speed; Computer science; Simulation; Engineering; Transport engineering","score_opus":0.03868400340896868,"score_gpt":0.21781186021371984,"score_spread":0.17912785680475116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241110173","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14728653,0.00023583113,0.83931166,0.00011281199,0.000027626187,0.00020082986,0.00016008347,0.000502808,0.012161836],"genre_scores_gemma":[0.8765683,0.00021415047,0.120163575,0.000019284113,0.000007240203,0.00012845662,0.0001530857,0.000086038635,0.0026598515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995272,0.000102563834,0.000020852614,0.00008927121,0.00016906032,0.00009098453],"domain_scores_gemma":[0.999481,0.0001271156,0.00015394711,0.00005863464,0.00014847919,0.000030862768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055203337,0.00072192325,0.00069574313,0.0005722318,0.00036737832,0.0011246412,0.0009311647,0.0005221078,0.0028161753],"category_scores_gemma":[0.001140665,0.00047584478,0.0005475218,0.00037417567,0.0004504725,0.0008352423,0.0005937707,0.00040452468,0.00053027394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050382507,0.000030410905,0.0013663482,0.000108635315,0.000016115508,0.000077617275,0.00007722846,0.9603305,0.00822404,0.0042919395,0.00046401596,0.024962764],"study_design_scores_gemma":[0.000017769546,0.00024191612,0.00095228804,0.00001766373,0.000029566287,0.00010923009,0.000099284734,0.986174,0.006424749,0.0026498022,0.0032625417,0.000021076215],"about_ca_topic_score_codex":0.0024940998,"about_ca_topic_score_gemma":0.0050097303,"teacher_disagreement_score":0.0028161753,"about_ca_system_score_codex":0.0007163791,"about_ca_system_score_gemma":0.0012616267,"threshold_uncertainty_score":0.009421051},"labels":[],"label_agreement":null},{"id":"W4244816476","doi":"10.31227/osf.io/6ektv","title":"ANALISIS TINGKAT PELAYANAN DAN KENYAMANAN JALUR PEDESTRIAN DI JALAN GAJAH MADA, DIPONEGORO DAN PAHLAWAN BERDASARKAN PERSEPSI PENGGUNA","year":2019,"lang":"id","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Art","score_opus":0.015538902041425747,"score_gpt":0.2189401066538938,"score_spread":0.20340120461246805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244816476","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86880684,0.0060934424,0.012447455,0.0041243294,0.0006239878,0.0009457286,0.010266747,0.00036172947,0.09632974],"genre_scores_gemma":[0.9062969,0.0051289587,0.013571795,0.00095175987,0.00011471861,0.0007171528,0.0043509896,0.00012217616,0.0687455],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.997695,0.00048728517,0.0002173021,0.0003860351,0.0008907363,0.00032359615],"domain_scores_gemma":[0.99511456,0.0014151772,0.00068070105,0.00022165,0.002241399,0.000326494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021039885,0.00082316843,0.00070418883,0.0031416127,0.002077212,0.002658574,0.0006451571,0.0008189068,0.022081368],"category_scores_gemma":[0.0052612317,0.0004068914,0.0011160956,0.003298672,0.00088283425,0.0017002336,0.0014527162,0.0012159686,0.004029991],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010064596,0.0005766868,0.62422967,0.004813443,0.00046933178,0.0038504568,0.037896626,0.0013548315,0.013948497,0.0066253054,0.03224612,0.27298257],"study_design_scores_gemma":[0.000025333678,0.0005948023,0.7399998,0.0013911861,0.0004147035,0.002210995,0.11569322,0.0015608952,0.0077944496,0.0023369638,0.1278124,0.0001652209],"about_ca_topic_score_codex":0.025606938,"about_ca_topic_score_gemma":0.05905554,"teacher_disagreement_score":0.025606938,"about_ca_system_score_codex":0.0020580462,"about_ca_system_score_gemma":0.0034638382,"threshold_uncertainty_score":0.073869586},"labels":[],"label_agreement":null},{"id":"W4245012362","doi":"10.33387/josae.v1i2.962","title":"DUKUNGAN MODA TRANSPORTASI UDARA DALAM PENGEMBANGAN KAWASAN INDUSTRI BULI KABUPATEN HALMAHERA TIMUR","year":2018,"lang":"en","type":"article","venue":"Journal of Science and Engineering","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Civil Aviation Organization","funders":"","keywords":"Christian ministry; Runway; Service (business); Dimension (graph theory); Ministry of Transport; Transport engineering; Business; Operations management; Engineering; Geography; Marketing; Mathematics; Political science; Cartography","score_opus":0.009265382053135485,"score_gpt":0.189488236564418,"score_spread":0.1802228545112825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245012362","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7404728,0.014454382,0.0077429954,0.0046893223,0.00088183896,0.00032571913,0.003612632,0.0008939189,0.22692639],"genre_scores_gemma":[0.81755126,0.007861938,0.007950497,0.00041478066,0.00009765331,0.00016266126,0.0020364884,0.00013923933,0.16378547],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997987,0.000021879496,0.000012989408,0.000048347832,0.000050978197,0.00006701801],"domain_scores_gemma":[0.99982256,0.000026286387,0.000025865185,0.000013266042,0.00007896523,0.000033069773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002350186,0.0008196669,0.00040713508,0.0009334414,0.0015662018,0.0026578698,0.0004087519,0.0005775944,0.028616594],"category_scores_gemma":[0.00033162336,0.00036112688,0.00033306723,0.0014464015,0.00050590606,0.0013228322,0.0011771837,0.00076222635,0.0051628426],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014565997,0.0005599632,0.1263447,0.003135237,0.0001945386,0.008050343,0.01431464,0.0062138676,0.04424948,0.042423904,0.05321106,0.6998457],"study_design_scores_gemma":[0.00004637706,0.00038400336,0.20241189,0.0006204928,0.00014840135,0.0026810518,0.021089034,0.004624779,0.013155484,0.0038190447,0.75089705,0.0001224201],"about_ca_topic_score_codex":0.017587913,"about_ca_topic_score_gemma":0.042144034,"teacher_disagreement_score":0.028616594,"about_ca_system_score_codex":0.002193002,"about_ca_system_score_gemma":0.0025851498,"threshold_uncertainty_score":0.09573209},"labels":[],"label_agreement":null},{"id":"W4246423519","doi":"10.31227/osf.io/f5p9d","title":"Analisis kelayakan pembangunan jalan Tol Medan-Banda Aceh.","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Prosperity; Toll; Investment (military); Cash flow; Discounted cash flow; Value (mathematics); Business; Economics; Geography; Finance; Mathematics; Economic growth; Statistics; Political science","score_opus":0.010291581416973316,"score_gpt":0.20615794000108378,"score_spread":0.19586635858411047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246423519","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7939012,0.002991984,0.0036055574,0.0012358235,0.00031778205,0.00013189498,0.008060288,0.00033393386,0.18942156],"genre_scores_gemma":[0.94866776,0.001259256,0.0033491761,0.00013018529,0.000034149423,0.00007162592,0.005004928,0.000083746054,0.041399244],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994791,0.000071970135,0.00003484353,0.00008921347,0.00021280591,0.000112166716],"domain_scores_gemma":[0.99901605,0.00030911446,0.00010272472,0.000049079088,0.00047630252,0.00004676679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062856684,0.00043683383,0.00025997616,0.0018974463,0.00079139584,0.0015471434,0.00038899132,0.00033689884,0.027855435],"category_scores_gemma":[0.0014707351,0.00013976675,0.00032481158,0.0022685512,0.00037874185,0.0009004939,0.0006502892,0.0005775639,0.0049118316],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018007439,0.0008221856,0.2993679,0.0023546924,0.00047113124,0.00426094,0.013072319,0.0073906295,0.016120918,0.024609325,0.0793869,0.5503423],"study_design_scores_gemma":[0.000027222977,0.00025685653,0.6511126,0.00043226374,0.00024029784,0.0024403126,0.054393955,0.0056035733,0.011873601,0.004548731,0.26898804,0.00008260905],"about_ca_topic_score_codex":0.010848125,"about_ca_topic_score_gemma":0.012264607,"teacher_disagreement_score":0.027855435,"about_ca_system_score_codex":0.0007804493,"about_ca_system_score_gemma":0.000777199,"threshold_uncertainty_score":0.09318566},"labels":[],"label_agreement":null},{"id":"W4246650676","doi":"10.35940/ijrte.c4432.099320","title":"Performance Analysis of a Roundabout and a 3 leg Intersection Under Heterogeneous Traffic","year":2020,"lang":"en","type":"article","venue":"International Journal of Recent Technology and Engineering (IJRTE)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Roundabout; Intersection (aeronautics); Transport engineering; Level of service; Traffic volume; Computer science; Engineering","score_opus":0.008338028268910535,"score_gpt":0.19248639231475637,"score_spread":0.18414836404584584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246650676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950954,0.000050620307,0.0034932075,0.000025339534,0.00001130495,0.000018646711,0.00010602375,0.00012610386,0.0010734855],"genre_scores_gemma":[0.99905306,0.000026469514,0.0004916104,0.000003487459,0.0000024978904,0.0000055844353,0.00015742719,0.0000073289348,0.00025243842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99859613,0.00022136485,0.000053485357,0.00025234415,0.00036062993,0.0005161378],"domain_scores_gemma":[0.9977216,0.00076997164,0.00034329252,0.00016407405,0.00071493775,0.00028614505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009857039,0.00086605403,0.0007246283,0.0015217656,0.0008029255,0.0016965686,0.00084092584,0.0007953838,0.0022424175],"category_scores_gemma":[0.002401025,0.00022216774,0.0004449,0.0011131942,0.00048461944,0.0009359742,0.0007769335,0.0003588293,0.00038975448],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00219878,0.0005324675,0.11347485,0.00015173412,0.00019181521,0.0014719057,0.0004917175,0.819663,0.028525414,0.0015428881,0.0011394155,0.030616043],"study_design_scores_gemma":[0.000025586038,0.0011541642,0.06119873,0.000013487923,0.00011856504,0.00024187683,0.001439663,0.92570895,0.00907816,0.00041711735,0.0005547548,0.000048837002],"about_ca_topic_score_codex":0.017362831,"about_ca_topic_score_gemma":0.0110606905,"teacher_disagreement_score":0.017362831,"about_ca_system_score_codex":0.0014179994,"about_ca_system_score_gemma":0.0008328394,"threshold_uncertainty_score":0.034523547},"labels":[],"label_agreement":null},{"id":"W4247093946","doi":"10.31227/osf.io/7wqat","title":"Analisis kinerja simpang Ciceri Serang Banten","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Intersection (aeronautics); Queue; Transport engineering; Degree of saturation; Traffic flow (computer networking); Saturation (graph theory); Mathematics; Computer science; Engineering; Environmental science; Computer network; Combinatorics","score_opus":0.01156399596505414,"score_gpt":0.20370428543960886,"score_spread":0.19214028947455472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247093946","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97261876,0.00074956176,0.0021558946,0.00019232245,0.000041840856,0.000060339105,0.0015501071,0.00008347802,0.02254776],"genre_scores_gemma":[0.98509324,0.00061178213,0.0029372866,0.00003227703,0.000019015104,0.000050067698,0.0017520692,0.000032260537,0.009471985],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992055,0.000068850124,0.00005593084,0.00014967783,0.0003954671,0.00012451972],"domain_scores_gemma":[0.9990791,0.00019886516,0.00015996752,0.000053592226,0.00044326272,0.00006515729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007685075,0.00039372625,0.0004171229,0.0027995182,0.000857249,0.0017026204,0.0004110691,0.00030705173,0.0065354994],"category_scores_gemma":[0.0017036474,0.00017057196,0.0002959529,0.0028481134,0.00052063784,0.0005572907,0.00081061164,0.00045976345,0.0010586351],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065289123,0.00020706467,0.7766867,0.0007733764,0.00018872521,0.0031009016,0.011644357,0.00454537,0.012218028,0.009512184,0.012650051,0.16782035],"study_design_scores_gemma":[0.000006247642,0.00009124803,0.92721075,0.00015749506,0.000078712954,0.0008453511,0.016179502,0.0056745284,0.0037454888,0.0010354781,0.044935197,0.00003999446],"about_ca_topic_score_codex":0.026384471,"about_ca_topic_score_gemma":0.03960159,"teacher_disagreement_score":0.026384471,"about_ca_system_score_codex":0.0010864037,"about_ca_system_score_gemma":0.0011063506,"threshold_uncertainty_score":0.052461803},"labels":[],"label_agreement":null},{"id":"W4247145719","doi":"10.31227/osf.io/z8b4c","title":"ANALISA KEBISINGAN AKIBAT AKTIVITAS TRANSPORTASI DI JALAN AHMAD YANI KOTA SORONG","year":2018,"lang":"id","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Barrie Urology Group","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.016033849834263685,"score_gpt":0.2194107298625111,"score_spread":0.20337688002824741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247145719","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92240757,0.008189737,0.0065342146,0.001959392,0.00043860523,0.0006946692,0.010529885,0.0002517645,0.048994146],"genre_scores_gemma":[0.92549264,0.0066745044,0.011093409,0.000692687,0.00009449304,0.0007097502,0.0054716133,0.00014378573,0.049627263],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988673,0.0002523431,0.00013606879,0.0002088581,0.0003029703,0.00023256139],"domain_scores_gemma":[0.99837494,0.00042763856,0.00025123518,0.00010402962,0.00071143697,0.00013063064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016522132,0.0008104842,0.000684127,0.0019048704,0.0015199012,0.0032285661,0.0006900882,0.00078529544,0.014314635],"category_scores_gemma":[0.0024737748,0.00043977966,0.0010057976,0.0018146442,0.000626768,0.0015725865,0.0013964875,0.0012019863,0.003088554],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018090575,0.00067256414,0.71111876,0.003990163,0.000540168,0.0024437269,0.018625798,0.0010895128,0.022028798,0.004169927,0.014788505,0.21872306],"study_design_scores_gemma":[0.000055207456,0.001157059,0.7596901,0.0017673001,0.0008055149,0.0024060714,0.066374294,0.0023577276,0.018769935,0.002361802,0.14405476,0.00020023182],"about_ca_topic_score_codex":0.024948997,"about_ca_topic_score_gemma":0.046060324,"teacher_disagreement_score":0.024948997,"about_ca_system_score_codex":0.0012934641,"about_ca_system_score_gemma":0.0026645164,"threshold_uncertainty_score":0.049607515},"labels":[],"label_agreement":null},{"id":"W4254189127","doi":"10.32920/ryerson.14644503","title":"BRT omnibus : how bus rapid transit enhances mobility","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bus rapid transit; Popularity; Flexibility (engineering); Transit (satellite); Mode (computer interface); Transport engineering; Computer science; Public transport; Business; Engineering; Economics; Political science","score_opus":0.011861462574701529,"score_gpt":0.18826450067832456,"score_spread":0.17640303810362304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254189127","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3345959,0.0019490422,0.028668314,0.017639535,0.0004329567,0.00017295715,0.0006100797,0.000524753,0.61540645],"genre_scores_gemma":[0.9479889,0.0018026134,0.014605904,0.00043158708,0.00005804856,0.0000553151,0.00019106992,0.00010387549,0.0347626],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9993345,0.00039841194,0.000015182869,0.00005826998,0.000111856854,0.000081759856],"domain_scores_gemma":[0.99917394,0.00038777216,0.000089813235,0.000060657298,0.00016579393,0.00012199266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013457496,0.00023798877,0.000087343185,0.00059955096,0.00078373856,0.0030635523,0.00044412038,0.0004699805,0.012823508],"category_scores_gemma":[0.0031861707,0.00013428026,0.00024623566,0.0007795012,0.0010067516,0.0028899603,0.0016140175,0.0003856744,0.001082127],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004589946,0.00035660897,0.02177969,0.0011784758,0.00007306817,0.0011888219,0.010383086,0.015793566,0.008343382,0.6064178,0.0449066,0.28911993],"study_design_scores_gemma":[0.00015127382,0.0008118696,0.02420279,0.0007082706,0.00023378369,0.00091815455,0.024316447,0.035797577,0.009602831,0.135697,0.76746714,0.000092772956],"about_ca_topic_score_codex":0.0064074597,"about_ca_topic_score_gemma":0.016724303,"teacher_disagreement_score":0.012823508,"about_ca_system_score_codex":0.0016047461,"about_ca_system_score_gemma":0.0018081279,"threshold_uncertainty_score":0.042898953},"labels":[],"label_agreement":null},{"id":"W4254902274","doi":"10.32920/ryerson.14653071","title":"Geometric design of single-lane roundabouts for optimum consistency and operation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Roundabout; Geometric design; Consistency (knowledge bases); Path (computing); Intersection (aeronautics); Design speed; Computer science; Simulation; Engineering; Transport engineering","score_opus":0.03868400340896868,"score_gpt":0.21781186021371984,"score_spread":0.17912785680475116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254902274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14728653,0.00023583113,0.83931166,0.00011281199,0.000027626187,0.00020082986,0.00016008347,0.000502808,0.012161836],"genre_scores_gemma":[0.8765683,0.00021415047,0.120163575,0.000019284113,0.000007240203,0.00012845662,0.0001530857,0.000086038635,0.0026598515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995272,0.000102563834,0.000020852614,0.00008927121,0.00016906032,0.00009098453],"domain_scores_gemma":[0.999481,0.0001271156,0.00015394711,0.00005863464,0.00014847919,0.000030862768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055203337,0.00072192325,0.00069574313,0.0005722318,0.00036737832,0.0011246412,0.0009311647,0.0005221078,0.0028161753],"category_scores_gemma":[0.001140665,0.00047584478,0.0005475218,0.00037417567,0.0004504725,0.0008352423,0.0005937707,0.00040452468,0.00053027394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050382507,0.000030410905,0.0013663482,0.000108635315,0.000016115508,0.000077617275,0.00007722846,0.9603305,0.00822404,0.0042919395,0.00046401596,0.024962764],"study_design_scores_gemma":[0.000017769546,0.00024191612,0.00095228804,0.00001766373,0.000029566287,0.00010923009,0.000099284734,0.986174,0.006424749,0.0026498022,0.0032625417,0.000021076215],"about_ca_topic_score_codex":0.0024940998,"about_ca_topic_score_gemma":0.0050097303,"teacher_disagreement_score":0.0028161753,"about_ca_system_score_codex":0.0007163791,"about_ca_system_score_gemma":0.0012616267,"threshold_uncertainty_score":0.009421051},"labels":[],"label_agreement":null},{"id":"W4283751682","doi":"10.36080/an.v1i03.24","title":"FORECASTING EFEK PEMBANGUNAN DRY PORT TERHADAP PERTUMBUHAN PRODUK DOMESTIK REGIONAL BRUTO: STUDI KASUS SULAWESI SELATAN","year":2022,"lang":"en","type":"article","venue":"Artinara","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Port (circuit theory); Business; Agricultural economics; Environmental science; Agricultural science; Operations management; Economics; Engineering; Electrical engineering","score_opus":0.022176243234284514,"score_gpt":0.2001831525684135,"score_spread":0.178006909334129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283751682","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99831843,0.00012569621,0.0002764398,0.00006737337,0.000003980748,0.000011112934,0.00009916202,0.0000035122673,0.0010944547],"genre_scores_gemma":[0.99789536,0.00028953198,0.00038053724,0.0000064208953,0.0000035585813,0.000010249198,0.00018505077,0.0000027408234,0.0012265],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982303,0.0000445587,0.000012429778,0.00003688709,0.000048317295,0.00003484575],"domain_scores_gemma":[0.9994506,0.00026334522,0.000085028616,0.000019542951,0.000116853604,0.00006457074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077019556,0.00032153403,0.00031142592,0.00087558484,0.00038636476,0.0013047085,0.0002821734,0.0003105048,0.0015074578],"category_scores_gemma":[0.0010527872,0.00018318693,0.00036086087,0.001112671,0.00024462177,0.00094346097,0.00035557046,0.000511082,0.0003745074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069867435,0.0017627298,0.8323407,0.0002622326,0.00025665486,0.002641155,0.00969605,0.026891662,0.0032104035,0.0040166574,0.0028084517,0.115414545],"study_design_scores_gemma":[0.00002625665,0.00073962676,0.8605598,0.00012721874,0.00021827387,0.00026035146,0.030488925,0.09277454,0.0027600208,0.0017345347,0.010262083,0.000048451697],"about_ca_topic_score_codex":0.0355017,"about_ca_topic_score_gemma":0.049675673,"teacher_disagreement_score":0.0355017,"about_ca_system_score_codex":0.0010715072,"about_ca_system_score_gemma":0.00074053276,"threshold_uncertainty_score":0.07059008},"labels":[],"label_agreement":null},{"id":"W4288033711","doi":"10.18280/ijsdp.170426","title":"Towards Sustainable Transportation in Urban Areas: A Case Study","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Negeri Semarang","keywords":"Nonprobability sampling; Business; Analytic hierarchy process; Sustainable development; Metropolitan area; Government (linguistics); Environmental planning; Service (business); Sustainable transport; Public transport; Local government; Agency (philosophy); Transport engineering; Environmental economics; Sustainability; Engineering; Operations research; Marketing; Population; Economics; Public administration; Geography","score_opus":0.009867900908543786,"score_gpt":0.22757402757935116,"score_spread":0.21770612667080738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288033711","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9717423,0.0003604154,0.0028543007,0.0010083917,0.00003309735,0.00023368484,0.00006632104,0.00001933715,0.023682075],"genre_scores_gemma":[0.9893371,0.0012031185,0.0037631802,0.00014508399,0.000012850487,0.00012880247,0.000054556815,0.000007241592,0.0053480193],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99869317,0.00083109294,0.00003229952,0.00006643764,0.00014019477,0.00023687004],"domain_scores_gemma":[0.999395,0.00026246635,0.00007450367,0.000041819003,0.00007345528,0.0001527368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012072697,0.00048310752,0.00023042125,0.0012474534,0.005178978,0.0023513047,0.0012793842,0.002340284,0.0030940247],"category_scores_gemma":[0.001174268,0.00028720163,0.00042009717,0.0034296578,0.0018349846,0.0014704375,0.002579233,0.0010108935,0.00039043094],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049672683,0.0061405827,0.086477414,0.0017570762,0.00014304607,0.2667252,0.3079147,0.037658744,0.008083999,0.12207083,0.01668946,0.14584225],"study_design_scores_gemma":[0.000075801596,0.0009048428,0.019678704,0.00044403985,0.00007686206,0.015504572,0.8031497,0.013519282,0.003874141,0.0067299814,0.13595459,0.00008743],"about_ca_topic_score_codex":0.008002208,"about_ca_topic_score_gemma":0.023415467,"teacher_disagreement_score":0.008002208,"about_ca_system_score_codex":0.002099728,"about_ca_system_score_gemma":0.0015431709,"threshold_uncertainty_score":0.015911281},"labels":[],"label_agreement":null},{"id":"W4288781691","doi":"10.54941/ahfe1002729","title":"Sustainable Transport Development Strategy in Developed and Developing Countries","year":2022,"lang":"en","type":"article","venue":"AHFE international","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainable development; Sustainable transport; China; Investment (military); Transportation planning; Business; Scopus; Environmental economics; Transport engineering; Sustainability; Engineering; Economics; Geography; Political science","score_opus":0.010889849130546907,"score_gpt":0.21052357650949172,"score_spread":0.1996337273789448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288781691","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3374873,0.058425386,0.005420846,0.018333422,0.0005572698,0.00049663655,0.005389202,0.00016225682,0.57372767],"genre_scores_gemma":[0.94058657,0.03645451,0.0047422163,0.0008955183,0.0000432168,0.00031309045,0.0019695484,0.00003094037,0.014964443],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9987362,0.0003697571,0.00014802524,0.00011338811,0.0003471427,0.00028549376],"domain_scores_gemma":[0.9990176,0.0001613756,0.00016851837,0.000041438278,0.00047511468,0.00013600857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018562751,0.0005428042,0.0003020188,0.007372341,0.001579906,0.006485962,0.0004423831,0.0007521263,0.0034240382],"category_scores_gemma":[0.0025594705,0.0001505189,0.00034400242,0.021544209,0.000808312,0.0031863567,0.0019957295,0.0004793676,0.00043373607],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107762295,0.00024032078,0.12283365,0.0039205896,0.0003107465,0.0026851867,0.01361493,0.011194985,0.0012622032,0.40942356,0.04597299,0.3884331],"study_design_scores_gemma":[0.00003524574,0.00015690915,0.15280628,0.003831768,0.00023912218,0.001070027,0.09874806,0.004975521,0.0018938124,0.0326904,0.70346737,0.00008542075],"about_ca_topic_score_codex":0.035545584,"about_ca_topic_score_gemma":0.03762993,"teacher_disagreement_score":0.035545584,"about_ca_system_score_codex":0.007896556,"about_ca_system_score_gemma":0.014743568,"threshold_uncertainty_score":0.0706774},"labels":[],"label_agreement":null},{"id":"W4292880498","doi":"10.53730/ijhs.v6ns6.11892","title":"ISO urban quality to measure the level of efficiency of urban transport","year":2022,"lang":"en","type":"article","venue":"International Journal of Health Sciences","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Standardization; Business; Certificate; Regional science; Quality (philosophy); Transport engineering; Measure (data warehouse); Environmental planning; Geography; Environmental economics; Computer science; Engineering; Economics","score_opus":0.09803814435739244,"score_gpt":0.33484475878765546,"score_spread":0.23680661443026302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292880498","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06578249,0.0091668395,0.41369605,0.0025388878,0.0029142115,0.0030363868,0.056734316,0.0044458355,0.44168496],"genre_scores_gemma":[0.6389334,0.00893466,0.19813856,0.0014062977,0.00054230087,0.0041863583,0.093201496,0.0016277299,0.053029116],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9842464,0.0022126012,0.0015233527,0.0009022029,0.01040383,0.0007115771],"domain_scores_gemma":[0.9865652,0.0011743536,0.0011503102,0.0009253776,0.009925676,0.00025910977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049584983,0.0013255279,0.0010084074,0.007261379,0.0011158143,0.0034152223,0.0016818478,0.0008828671,0.007505685],"category_scores_gemma":[0.010403521,0.00038771093,0.0012163538,0.009633698,0.0011591911,0.002451998,0.0024203784,0.0014670555,0.0030287893],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035388756,0.0005897319,0.12264902,0.0040725353,0.0004947236,0.00031595558,0.0021418775,0.026198136,0.009787998,0.20440538,0.24972115,0.37926954],"study_design_scores_gemma":[0.00005320866,0.000360683,0.12108906,0.0010551922,0.00020749946,0.0003380728,0.0024403092,0.014366087,0.008203989,0.02687155,0.8248134,0.00020089226],"about_ca_topic_score_codex":0.03178083,"about_ca_topic_score_gemma":0.028609164,"teacher_disagreement_score":0.03178083,"about_ca_system_score_codex":0.0039623417,"about_ca_system_score_gemma":0.0057403157,"threshold_uncertainty_score":0.06319171},"labels":[],"label_agreement":null},{"id":"W4293758631","doi":"10.26593/jhpji.v8i2.5993.91-102","title":"KEUNGGULAN INOVATIF PEMBANGUNAN JALAN TOL LAYANG PETTARANI UNTUK MENDUKUNG MODERNISASI JARINGAN JALAN DI METROPOLITAN MAMMINASATA","year":2022,"lang":"en","type":"article","venue":"Jurnal HPJI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Metropolitan area; Geography; Toll; Transport engineering; Cartography; Engineering; Archaeology","score_opus":0.0096306599833302,"score_gpt":0.19478537180090855,"score_spread":0.18515471181757834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293758631","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49204203,0.008668545,0.009359836,0.006559055,0.0011962288,0.00021093318,0.00082354376,0.0005338852,0.48060593],"genre_scores_gemma":[0.75843465,0.0052736215,0.0065580723,0.00037985196,0.00011642562,0.00012721025,0.00045801656,0.0001251571,0.22852698],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9999089,0.000012204218,0.00000618721,0.000022582242,0.000021685259,0.000028330529],"domain_scores_gemma":[0.9998834,0.000013570356,0.00001643489,0.000009180271,0.00003838206,0.000038933467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015524741,0.00036289543,0.00018961758,0.00031100103,0.0012201588,0.001949315,0.00030801664,0.0003710853,0.021397894],"category_scores_gemma":[0.00015870701,0.00013824894,0.00019290538,0.00045923935,0.00033592564,0.0010923112,0.0011441207,0.0007170977,0.0032146072],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063255057,0.0008378427,0.06590505,0.0019657325,0.00006855083,0.0067221546,0.009669356,0.0036147702,0.035419784,0.059200615,0.069794685,0.7461689],"study_design_scores_gemma":[0.000028839038,0.00027728613,0.08779654,0.0006666031,0.00009351185,0.00336657,0.020915065,0.0037875753,0.011460711,0.00546961,0.86606336,0.0000744877],"about_ca_topic_score_codex":0.0024501674,"about_ca_topic_score_gemma":0.0067623365,"teacher_disagreement_score":0.021397894,"about_ca_system_score_codex":0.00070615823,"about_ca_system_score_gemma":0.0012192932,"threshold_uncertainty_score":0.07158309},"labels":[],"label_agreement":null},{"id":"W4293758650","doi":"10.26593/jhpji.v8i1.5559.27-38","title":"TINGKAT KEPENTINGAN DAN KUALITAS FASILITAS PEJALAN KAKI DAN KORELASINYA TERHADAP WALKABILITY PADA KAWASAN TRANSIT ORIENTED DEVELOPMENT DI JAKARTA","year":2022,"lang":"en","type":"article","venue":"Jurnal HPJI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Walkability; Transport engineering; Pedestrian; Geography; Engineering; Civil engineering; Built environment","score_opus":0.010015383401017677,"score_gpt":0.20029536735471937,"score_spread":0.1902799839537017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293758650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88655865,0.0037569352,0.0029512194,0.0013163078,0.00016181105,0.00016315203,0.00066719163,0.00014865167,0.104276165],"genre_scores_gemma":[0.9611475,0.0027706025,0.0033187803,0.00011221678,0.000020705604,0.000103290055,0.00030380272,0.00003158345,0.03219138],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996878,0.00006710792,0.000025374067,0.000039873772,0.00009202951,0.000087913795],"domain_scores_gemma":[0.9995567,0.00008579096,0.00005203703,0.000027307336,0.00015403866,0.0001240787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030573842,0.00047432046,0.00023421108,0.0010850752,0.0018418457,0.0025835459,0.00034016234,0.00028873608,0.013052799],"category_scores_gemma":[0.00056963204,0.00017542714,0.00027279003,0.0010709638,0.0006192361,0.0006095858,0.0014737681,0.0006483476,0.0016996711],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079190853,0.0015186433,0.26741382,0.0028782764,0.00016999283,0.0071614613,0.04208853,0.0033176248,0.04311517,0.037251983,0.015407841,0.5788848],"study_design_scores_gemma":[0.00003559683,0.00051987387,0.6606463,0.0015108886,0.0002672381,0.0028296462,0.07167249,0.0025046456,0.021837631,0.0051690154,0.2328187,0.00018793013],"about_ca_topic_score_codex":0.024846904,"about_ca_topic_score_gemma":0.061463073,"teacher_disagreement_score":0.024846904,"about_ca_system_score_codex":0.0017901439,"about_ca_system_score_gemma":0.0031620641,"threshold_uncertainty_score":0.04940456},"labels":[],"label_agreement":null},{"id":"W4294265749","doi":"10.25104/mtm.v20i1.2145","title":"Jalur Kereta Api Parangtritis – Bandara Yogyakarta International Airport (YIA) sebagai Pendukung Mobilitas, Pariwisata, dan Angkutan Barang","year":2022,"lang":"id","type":"article","venue":"Jurnal Transportasi Multimoda","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business; Transport engineering; Business administration; Computer science; Engineering","score_opus":0.012450010276032653,"score_gpt":0.22022129217070727,"score_spread":0.20777128189467461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294265749","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5037078,0.009633151,0.011288072,0.021071484,0.0030944145,0.00091007625,0.012614194,0.00078746985,0.43689325],"genre_scores_gemma":[0.7929576,0.011063708,0.008157112,0.0028390086,0.00041096564,0.000732841,0.0073227384,0.00030471466,0.17621124],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99948066,0.00009960701,0.000024301555,0.000070162125,0.00013828337,0.00018701194],"domain_scores_gemma":[0.9993594,0.00009772766,0.00010101389,0.00005430453,0.00021840069,0.00016917917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008037178,0.0006281287,0.00027513455,0.00070119306,0.0016800858,0.00332209,0.0005054949,0.0006447469,0.031653624],"category_scores_gemma":[0.0012808718,0.0003016355,0.0005012065,0.0012931481,0.0006395619,0.0015263413,0.0030921942,0.0017623226,0.004519374],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008580008,0.00056004705,0.27053833,0.0039244755,0.00037148088,0.0033239666,0.013622604,0.003611714,0.016857756,0.045774285,0.22557618,0.41498113],"study_design_scores_gemma":[0.00005647417,0.00034924754,0.32546237,0.0010852299,0.00013959067,0.0008847022,0.029775767,0.0013643628,0.0026173443,0.0028799449,0.63528335,0.00010157917],"about_ca_topic_score_codex":0.048465624,"about_ca_topic_score_gemma":0.084947936,"teacher_disagreement_score":0.048465624,"about_ca_system_score_codex":0.0020512755,"about_ca_system_score_gemma":0.0065076165,"threshold_uncertainty_score":0.10589188},"labels":[],"label_agreement":null},{"id":"W4297808289","doi":"10.29313/bcsurp.v2i2.4320","title":"Evaluasi Jalur Pedestrian Koridor Jalan Raya Cilegon - Jalan SA Tirtayasa Kota Cilegon","year":2022,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Pedestrian; Physics; Transport engineering; Engineering","score_opus":0.0313945885992546,"score_gpt":0.22156154278345122,"score_spread":0.19016695418419663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297808289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8975574,0.0017276903,0.0015932425,0.001135327,0.00025275137,0.00020607632,0.00026344467,0.00007906567,0.097185],"genre_scores_gemma":[0.9636297,0.0022397323,0.0031166044,0.00015536782,0.0000326231,0.00012289423,0.0003518488,0.000029075194,0.03032205],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991055,0.00033529455,0.000045075958,0.00007237788,0.00031773097,0.00012400305],"domain_scores_gemma":[0.99842477,0.00025497025,0.000140113,0.000038479888,0.000984907,0.00015677551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015397274,0.00044194923,0.00029857297,0.0007163819,0.0014438144,0.0018577733,0.00028150028,0.00034681556,0.012511979],"category_scores_gemma":[0.0022571739,0.000116776944,0.0003066027,0.00057610223,0.0005019153,0.00083722087,0.0008155968,0.0004997667,0.0019575944],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012902456,0.0022226467,0.19479914,0.0040000505,0.00010741853,0.004306523,0.085772246,0.0045371293,0.022990353,0.014742993,0.05895689,0.6062744],"study_design_scores_gemma":[0.000044796292,0.0029975264,0.40467116,0.0019972068,0.00024897527,0.0018711186,0.26393038,0.0023789387,0.015987478,0.0015932424,0.3041014,0.00017772836],"about_ca_topic_score_codex":0.005012605,"about_ca_topic_score_gemma":0.012379131,"teacher_disagreement_score":0.012511979,"about_ca_system_score_codex":0.0020482712,"about_ca_system_score_gemma":0.0019709123,"threshold_uncertainty_score":0.041856706},"labels":[],"label_agreement":null},{"id":"W4300797969","doi":"10.33751/teknik.v16i1.354","title":"EVALUASI KINERJA JALAN RAYA LEUWILIANG - KABUPATEN BOGOR","year":2015,"lang":"id","type":"article","venue":"Jurnal Teknik | Majalah Ilmiah Fakultas Teknik UNPAK","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Forestry; Geography","score_opus":0.03374029086822363,"score_gpt":0.24454673627180695,"score_spread":0.21080644540358331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300797969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86680984,0.0042948634,0.0112522375,0.00086795236,0.0003818896,0.001214221,0.0037722043,0.00082220696,0.11058453],"genre_scores_gemma":[0.88233095,0.003270018,0.019919181,0.00047520344,0.000058911253,0.0012284749,0.0025256693,0.0004343788,0.08975727],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981413,0.00040756073,0.00011544415,0.00028981996,0.00084881403,0.00019709156],"domain_scores_gemma":[0.99806744,0.0005966331,0.00019502558,0.00013805664,0.0007685545,0.00023424528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017994137,0.00080842525,0.00075961126,0.0009982797,0.00090181106,0.0022670266,0.00053046504,0.00060968456,0.02583096],"category_scores_gemma":[0.0033630212,0.00028231708,0.00076707307,0.00079235446,0.0005884444,0.0013501716,0.0011224236,0.0011307913,0.0055649984],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007956887,0.0038785262,0.13139613,0.005892532,0.00059672585,0.0007859365,0.0151528595,0.0024389604,0.18598084,0.0074023847,0.020902747,0.61761546],"study_design_scores_gemma":[0.00020433504,0.007689482,0.57894826,0.0015830852,0.0012989936,0.0009266775,0.03030333,0.004641069,0.14329489,0.0069453977,0.22377184,0.00039257872],"about_ca_topic_score_codex":0.0066109886,"about_ca_topic_score_gemma":0.01572132,"teacher_disagreement_score":0.02583096,"about_ca_system_score_codex":0.00095982826,"about_ca_system_score_gemma":0.001518602,"threshold_uncertainty_score":0.086413145},"labels":[],"label_agreement":null},{"id":"W4306925938","doi":"10.18280/ijsdp.170625","title":"Evaluating the Level of the Shuttle Service Quality at Al al-Bayt University Campus Using the SERVQUAL Model","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"SERVQUAL; Service quality; Reliability (semiconductor); Service (business); Business; Operations management; Computer science; Marketing; Engineering","score_opus":0.09976364833843536,"score_gpt":0.312229138155934,"score_spread":0.21246548981749863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4306925938","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98172355,0.000114543705,0.004192179,0.00041939382,0.000010820322,0.00018179022,0.00039732657,0.000031488467,0.012929006],"genre_scores_gemma":[0.9968792,0.000092654496,0.0019474139,0.000024651506,0.000002590414,0.000041400483,0.0001749372,0.0000026771422,0.0008344951],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9979405,0.00054144464,0.00018595112,0.00007836502,0.0009990835,0.00025468768],"domain_scores_gemma":[0.9969062,0.0007080529,0.00061122666,0.00009874948,0.0013193573,0.00035638682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002381036,0.00019345208,0.0002152862,0.0017392575,0.0006209935,0.0014745144,0.0002511346,0.00023284041,0.002832628],"category_scores_gemma":[0.003909795,0.00009519235,0.00039810204,0.0018038421,0.00042017008,0.0010861388,0.0007553239,0.0004629461,0.00033704357],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001445216,0.0006703857,0.8437449,0.0003649793,0.00006251114,0.00032279914,0.007835194,0.0038197117,0.0030464265,0.004032664,0.0026542125,0.13330181],"study_design_scores_gemma":[0.0000145284275,0.0011932867,0.92489654,0.00027527797,0.00006580939,0.00033632896,0.04229778,0.016244153,0.0045651644,0.0012828142,0.008762265,0.00006592133],"about_ca_topic_score_codex":0.006681335,"about_ca_topic_score_gemma":0.009695905,"teacher_disagreement_score":0.006681335,"about_ca_system_score_codex":0.0016461868,"about_ca_system_score_gemma":0.0016609628,"threshold_uncertainty_score":0.013284862},"labels":[],"label_agreement":null},{"id":"W4307709108","doi":"10.21776/ub.civense.2022.00502.4","title":"Factors Affecting Commuters' Intentions in Using Park and Ride (P&amp;R) Facilities Based on Theory of Planned Behavior","year":2022,"lang":"en","type":"article","venue":"Civil and Environmental Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Theory of planned behavior; Public transport; Transport engineering; China; Business; Control (management); Travel behavior; Engineering; Geography; Economics","score_opus":0.023363614266691955,"score_gpt":0.19903945961666863,"score_spread":0.17567584534997668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307709108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99836427,0.0000317615,0.00034950353,0.00007022439,0.0000027187461,0.00003430908,0.000049302562,0.0000043643818,0.0010934664],"genre_scores_gemma":[0.99932003,0.00004350796,0.0002770612,0.000016663784,0.000001494358,0.000019991257,0.0000666482,0.000001068969,0.00025352533],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994512,0.00018496231,0.0000777437,0.0000665807,0.00012140597,0.000097977594],"domain_scores_gemma":[0.9964212,0.0015909951,0.0010618451,0.00013568084,0.00042173965,0.0003685656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012254874,0.00018961397,0.00016670888,0.00050123665,0.0003372144,0.0006912641,0.00018968432,0.00035506472,0.0022641153],"category_scores_gemma":[0.004034648,0.00020276799,0.0006127978,0.00033389576,0.00044066337,0.0003076457,0.00034300296,0.00067447295,0.00019779777],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030460806,0.00028333638,0.9930889,0.000026635233,0.000038017042,0.00005360393,0.0017773918,0.00030878664,0.00032176473,0.00018428454,0.00007824456,0.0038086032],"study_design_scores_gemma":[0.0000049723867,0.00020486466,0.99447095,0.000021817683,0.00003636594,0.000042798136,0.0032075364,0.001419852,0.00015620443,0.00015727602,0.00026957397,0.000007857415],"about_ca_topic_score_codex":0.012225245,"about_ca_topic_score_gemma":0.016012603,"teacher_disagreement_score":0.012225245,"about_ca_system_score_codex":0.000334335,"about_ca_system_score_gemma":0.0006311406,"threshold_uncertainty_score":0.024308145},"labels":[],"label_agreement":null},{"id":"W4312185354","doi":"10.5267/j.uscm.2022.9.012","title":"The impact of service quality, ticket price policy and passenger trust on airport train passenger loyalty","year":2022,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ticket; Loyalty; Business; Service quality; Service (business); Quality (philosophy); Marketing; Quality of service; LISREL; Sample (material); Mediation; Structural equation modeling; Advertising; Transport engineering; Computer science; Engineering; Telecommunications; Computer security","score_opus":0.01534814506527049,"score_gpt":0.26385009680439364,"score_spread":0.24850195173912315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312185354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99688345,0.0000674393,0.00043839277,0.00013217583,0.0000039453935,0.000007617059,0.00004656484,0.0000018178664,0.002418531],"genre_scores_gemma":[0.99971086,0.000028553852,0.00004190629,0.0000062692975,0.0000011568501,0.000002043909,0.000016719547,4.0221406e-7,0.00019199688],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984181,0.00072601927,0.0001038535,0.00009523099,0.0002418734,0.000414889],"domain_scores_gemma":[0.99071634,0.0046684467,0.0025333602,0.00028010135,0.00079071266,0.0010110644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012430607,0.00017994545,0.0002678927,0.00052728184,0.0005592302,0.0019509475,0.00025075322,0.0004802936,0.0038336616],"category_scores_gemma":[0.0076496415,0.00013154282,0.00043960402,0.00063573814,0.0005987678,0.0010436038,0.0009705478,0.0009776144,0.00020185961],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035942605,0.00043768247,0.9714029,0.000079358164,0.00022536238,0.00029206224,0.002144031,0.00474508,0.00063140277,0.004959831,0.00019991168,0.014523068],"study_design_scores_gemma":[0.000017004391,0.0005275938,0.9705075,0.00007337212,0.00018129285,0.00013171046,0.008946013,0.0158883,0.0005877099,0.0020651128,0.0010372901,0.00003709612],"about_ca_topic_score_codex":0.022270268,"about_ca_topic_score_gemma":0.022123555,"teacher_disagreement_score":0.022270268,"about_ca_system_score_codex":0.0020835379,"about_ca_system_score_gemma":0.0016501445,"threshold_uncertainty_score":0.044281244},"labels":[],"label_agreement":null},{"id":"W4312213217","doi":"10.47800/pvj.2022.12-05","title":"Quan hệ đối tác chuyển dịch năng lượng công bằng và những thách thức đặt ra cho ngành năng lượng Việt Nam","year":2022,"lang":"vi","type":"article","venue":"Petrovietnam Journal","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Chemistry; Stereochemistry; Medicinal chemistry; Nuclear chemistry","score_opus":0.006197950032798516,"score_gpt":0.1785490796746144,"score_spread":0.17235112964181587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312213217","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036899313,0.003855119,0.003011592,0.008325028,0.0010895723,0.00018208093,0.013179074,0.00031500513,0.93314314],"genre_scores_gemma":[0.15651491,0.0026205766,0.0018785561,0.00046100313,0.000038331913,0.000102037666,0.003925336,0.00020754014,0.8342517],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.99988186,0.0000141001,0.000003243858,0.00002104691,0.00003883714,0.000040939216],"domain_scores_gemma":[0.999866,0.000013536281,0.000013155472,0.000009483251,0.00005241903,0.000045446603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018386729,0.00034724665,0.00018176335,0.0002878686,0.0010646918,0.0019338598,0.0002274392,0.00040603123,0.10584995],"category_scores_gemma":[0.00028526844,0.00018375373,0.00018478175,0.00086794,0.0002868527,0.0006656024,0.0007338987,0.00045088065,0.014648532],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003495302,0.000098658464,0.04572393,0.00083544315,0.000073579904,0.00091911625,0.0018723776,0.001920996,0.008959052,0.037423737,0.61140376,0.29041976],"study_design_scores_gemma":[0.000007272052,0.000024602206,0.018531755,0.00008993365,0.000011369974,0.00012656457,0.0012678222,0.0007802271,0.0013810805,0.0006485661,0.97712237,0.0000085513375],"about_ca_topic_score_codex":0.12691875,"about_ca_topic_score_gemma":0.23995638,"teacher_disagreement_score":0.12691875,"about_ca_system_score_codex":0.002925527,"about_ca_system_score_gemma":0.0043978365,"threshold_uncertainty_score":0.3541034},"labels":[],"label_agreement":null},{"id":"W4312213469","doi":"10.32585/modulus.v4i2.2763","title":"Analisis Peningkatan Kinerja Gerbang Tol Cempaka Putih","year":2022,"lang":"id","type":"article","venue":"MoDuluS Media Komunikasi Dunia Ilmu Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.011343751153855759,"score_gpt":0.1863392437906136,"score_spread":0.17499549263675784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312213469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86751497,0.00436568,0.009416622,0.0011593375,0.000350142,0.0005140362,0.0049976404,0.0003465938,0.11133493],"genre_scores_gemma":[0.8523268,0.0031150482,0.011122182,0.00056994904,0.000056400073,0.00025906082,0.0025344456,0.00023501937,0.12978108],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9977621,0.00027738375,0.00015647944,0.00036313143,0.001160142,0.00028068665],"domain_scores_gemma":[0.99755174,0.00068955566,0.00029362648,0.0001423,0.0011542686,0.00016864412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014663977,0.00075344264,0.00071886776,0.0019175393,0.0015639703,0.0037401044,0.0008116826,0.0010134098,0.023964131],"category_scores_gemma":[0.0025221019,0.0005132948,0.00096701685,0.0020931133,0.0008502048,0.0013143903,0.0014850604,0.0014419532,0.004809383],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002814852,0.0011379931,0.42590484,0.0045888745,0.00046657512,0.0037718357,0.024184037,0.0019963088,0.16461459,0.0048420336,0.016503816,0.34917426],"study_design_scores_gemma":[0.0000420694,0.0014709439,0.6988314,0.0009499342,0.00047729537,0.0020938064,0.052886233,0.0022151815,0.08848359,0.0023045647,0.15004425,0.00020072638],"about_ca_topic_score_codex":0.014355424,"about_ca_topic_score_gemma":0.031736262,"teacher_disagreement_score":0.023964131,"about_ca_system_score_codex":0.0012593044,"about_ca_system_score_gemma":0.0019194284,"threshold_uncertainty_score":0.08016801},"labels":[],"label_agreement":null},{"id":"W4312583590","doi":"10.14710/jpk.10.1.93-103","title":"STUDI KOMPARATIF PERFORMA ANGKUTAN BRT TRANSJOGJA DAN TRANSJAKARTA","year":2022,"lang":"id","type":"article","venue":"Jurnal Pengembangan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Bus rapid transit; Humanities; Computer science; Transport engineering; Art; Engineering; Public transport","score_opus":0.015352650596966166,"score_gpt":0.2157399326257814,"score_spread":0.20038728202881523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312583590","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9225805,0.0043290956,0.005282168,0.0018825403,0.00032416685,0.00045411813,0.002084649,0.00031466348,0.06274812],"genre_scores_gemma":[0.93562937,0.0033408373,0.00389726,0.0005746601,0.000097351294,0.00047234292,0.0018371836,0.00021584841,0.053935047],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.996651,0.0007320942,0.0002586072,0.0005569447,0.0013382789,0.00046305291],"domain_scores_gemma":[0.98906296,0.0048119845,0.0010664637,0.0007407575,0.0035256671,0.0007922057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003595671,0.0006168149,0.0005780394,0.0009876098,0.0011633437,0.0037611288,0.00082758616,0.0008890998,0.024608178],"category_scores_gemma":[0.012052735,0.00040190454,0.00095620373,0.0013166864,0.0005397533,0.002730941,0.0013623157,0.001363676,0.006742668],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004287158,0.0036964666,0.40044767,0.0043403734,0.00075586035,0.0012134669,0.021606822,0.004597864,0.014350596,0.006573492,0.03285682,0.5052734],"study_design_scores_gemma":[0.00030372854,0.008710114,0.6911529,0.0018313724,0.0022759761,0.0015294702,0.046019368,0.0065414566,0.017782535,0.0044689337,0.21913801,0.0002461958],"about_ca_topic_score_codex":0.009064254,"about_ca_topic_score_gemma":0.015051286,"teacher_disagreement_score":0.024608178,"about_ca_system_score_codex":0.0014659998,"about_ca_system_score_gemma":0.0023872491,"threshold_uncertainty_score":0.08232254},"labels":[],"label_agreement":null},{"id":"W4312588131","doi":"10.33137/ic.v32i.38735","title":"Passenger Number 12","year":2022,"lang":"en","type":"article","venue":"Italian Canadiana","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Hôpital Notre-Dame","funders":"","keywords":"Computer science","score_opus":0.0056485277004152,"score_gpt":0.15944384283688587,"score_spread":0.15379531513647066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312588131","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053471,0.000769507,0.00062516134,0.0073599652,0.005812453,0.0001439523,0.007029009,0.00057914574,0.9723336],"genre_scores_gemma":[0.00512229,0.00017233752,0.00016209988,0.00037485996,0.00007451167,0.000006921675,0.0008228803,0.000059695863,0.9932045],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998998,0.00003374141,0.000012935114,0.00013948318,0.00040046358,0.0004152927],"domain_scores_gemma":[0.99877614,0.00001661762,0.000009024957,0.000028992949,0.0007716065,0.000397517],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00042976876,0.0011459554,0.00055637595,0.0013570001,0.009251128,0.0042446414,0.0009853316,0.0018324013,0.45129767],"category_scores_gemma":[0.00093380525,0.0003345614,0.00060827826,0.0013323132,0.0005884186,0.0007798282,0.001259107,0.002222268,0.15365613],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059320286,0.000032668362,0.0012943095,0.000039623377,0.0000049369664,0.00017220115,0.00015927904,0.00010744508,0.00047729688,0.0028001755,0.96763,0.027222652],"study_design_scores_gemma":[0.0000031398652,0.00001801551,0.0021986873,0.000024311115,0.0000044190942,0.00005291055,0.00035291162,0.00007804607,0.00020796176,0.00010963195,0.99693847,0.000011427919],"about_ca_topic_score_codex":0.7905233,"about_ca_topic_score_gemma":0.9254568,"teacher_disagreement_score":0.7905233,"about_ca_system_score_codex":0.008527018,"about_ca_system_score_gemma":0.015241528,"threshold_uncertainty_score":0.78265727},"labels":[],"label_agreement":null},{"id":"W4312741687","doi":"10.14710/tpwk.2022.28054","title":"Pengukuran Kesesuaian Titik Transit BRT Pada Koridor Simpang Lima - Terminal Penggaron Dengan Konsep Transit Oriented Development","year":2022,"lang":"en","type":"article","venue":"Teknik PWK (Perencanaan Wilayah Kota)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Bus rapid transit; Transport engineering; Transit-oriented development; Public transport; Transit (satellite); Business; Engineering","score_opus":0.009182775500392391,"score_gpt":0.182646459905261,"score_spread":0.1734636844048686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312741687","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7134956,0.0021949674,0.015480257,0.0014375562,0.00052079564,0.00046262844,0.0022647318,0.0012140978,0.26292935],"genre_scores_gemma":[0.89334637,0.0020398546,0.017283505,0.00024286006,0.000070711365,0.0002959218,0.00197879,0.00014996302,0.084591985],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99969196,0.000048898994,0.00002463556,0.000083621104,0.00007857318,0.00007232415],"domain_scores_gemma":[0.9996226,0.00007400067,0.000052663032,0.000036657733,0.00015113711,0.00006295082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004470541,0.00052660203,0.0003242386,0.00072717643,0.0015109213,0.0018550802,0.00044992557,0.0005051435,0.020759275],"category_scores_gemma":[0.0005939566,0.00025209153,0.0003713803,0.0012965741,0.0005317504,0.0014036107,0.0010865865,0.0008613442,0.004030383],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013075729,0.00090655236,0.09005306,0.0025152226,0.00008869124,0.0046266345,0.013891902,0.0041725393,0.03491817,0.03825279,0.027122952,0.78214395],"study_design_scores_gemma":[0.000107690044,0.0012215823,0.18157828,0.00060732267,0.00015474038,0.0043419767,0.023616107,0.0046089394,0.020950494,0.0052743703,0.7573764,0.00016211827],"about_ca_topic_score_codex":0.004352157,"about_ca_topic_score_gemma":0.008721277,"teacher_disagreement_score":0.020759275,"about_ca_system_score_codex":0.0011624818,"about_ca_system_score_gemma":0.0021852155,"threshold_uncertainty_score":0.06944674},"labels":[],"label_agreement":null},{"id":"W4313361387","doi":"10.36762/jurnaljateng.v20i1.889","title":"Presepsi Stakeholder Terhadap Elemen Jalur Pejalan Kaki di Kawasan Taman Gajah, Kota Bandar Lampung","year":2022,"lang":"id","type":"article","venue":"Jurnal Litbang Provinsi Jawa Tengah","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.022377629307149826,"score_gpt":0.20910913147202595,"score_spread":0.18673150216487613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313361387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6472815,0.001253254,0.014989262,0.00670547,0.00014549949,0.0002272956,0.0007261244,0.00011272124,0.32855877],"genre_scores_gemma":[0.9454259,0.00078834523,0.0024201432,0.0002453104,0.000020325282,0.00009183239,0.0001658524,0.000026915353,0.050815415],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99932134,0.00018499102,0.000023084842,0.00008318104,0.00020757882,0.0001799013],"domain_scores_gemma":[0.9994436,0.0001818738,0.000065564345,0.000033926928,0.00018361497,0.000091511996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006797066,0.00036451654,0.00029235787,0.0008690345,0.002916977,0.0039202473,0.0004970104,0.0007332825,0.018816546],"category_scores_gemma":[0.0012229908,0.00019174113,0.00032906642,0.0012253684,0.0012691825,0.0016252185,0.0018250992,0.0008250791,0.0015772389],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028412137,0.0005176424,0.1866342,0.0016121845,0.00015621395,0.0049220105,0.15766554,0.004003108,0.021385403,0.29344523,0.027235532,0.3021388],"study_design_scores_gemma":[0.000021427242,0.00028074885,0.278617,0.00067217374,0.00014347119,0.0013208876,0.37161487,0.0041641532,0.00588351,0.033956863,0.30319798,0.00012699534],"about_ca_topic_score_codex":0.018695226,"about_ca_topic_score_gemma":0.043215785,"teacher_disagreement_score":0.018816546,"about_ca_system_score_codex":0.00278792,"about_ca_system_score_gemma":0.0034189927,"threshold_uncertainty_score":0.06294769},"labels":[],"label_agreement":null},{"id":"W4321502974","doi":"10.13170/aijst.11.3.29082","title":"Study of Public Perceptions on the Urban Railway Planning of the City of Banda Aceh and the Surrounding Areas","year":2023,"lang":"en","type":"article","venue":"Aceh International Journal of Science and Technology","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Public transport; Land use; Environmental planning; Transport engineering; Geography; Business; Government (linguistics); Urban planning; Plan (archaeology); Land-use planning; Civil engineering; Engineering","score_opus":0.029725827845879984,"score_gpt":0.2631010139664811,"score_spread":0.23337518612060112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321502974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.998949,0.000014730167,0.000018805777,0.00007380257,0.0000018831198,0.000003150599,0.0000063953544,4.9592524e-7,0.00093173695],"genre_scores_gemma":[0.99970466,0.00003952183,0.000014203725,0.000018678762,0.0000021518865,0.000002184957,0.000007167164,3.5526165e-7,0.00021106077],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9993795,0.00021938141,0.000031524272,0.000039985218,0.00017012728,0.00015939589],"domain_scores_gemma":[0.9983387,0.0004536003,0.0005415915,0.000057445126,0.0003070185,0.0003015377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010964094,0.00015488132,0.0001810842,0.00058166654,0.0011184685,0.0010593341,0.00020663711,0.00033258874,0.002257423],"category_scores_gemma":[0.0016759457,0.0001410074,0.00019133987,0.0006127146,0.000957787,0.0005780033,0.000766176,0.00054334046,0.00014093415],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015253999,0.0005726464,0.8104152,0.00010971024,0.000043367923,0.0014538286,0.16145284,0.0003333318,0.0033369458,0.0009927448,0.0010690009,0.020067709],"study_design_scores_gemma":[0.0000049235514,0.00020927029,0.6470163,0.000043682005,0.0000143243415,0.00023974956,0.34943026,0.00032979308,0.0002484684,0.00007403701,0.0023711284,0.000018102623],"about_ca_topic_score_codex":0.020695928,"about_ca_topic_score_gemma":0.026844637,"teacher_disagreement_score":0.020695928,"about_ca_system_score_codex":0.0008866193,"about_ca_system_score_gemma":0.00073850947,"threshold_uncertainty_score":0.041150928},"labels":[],"label_agreement":null},{"id":"W4323304414","doi":"10.58406/sainteka.v4i1.1143","title":"ANALISIS KINERJA ZONA SELAMAT SEKOLAH (ZoSS) DI KOTA SUMBAWA","year":2023,"lang":"id","type":"article","venue":"Jurnal SainTekA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Summit Pacific College","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.012631361435105667,"score_gpt":0.21924698624231426,"score_spread":0.20661562480720858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323304414","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98472506,0.00048541464,0.0010921059,0.00012445157,0.000013310556,0.00006734107,0.0029897832,0.000041435713,0.010461086],"genre_scores_gemma":[0.98009616,0.00062163256,0.003090896,0.000048949565,0.0000071796526,0.00009990664,0.001823307,0.0000215058,0.014190461],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99948126,0.000082331346,0.000051445837,0.00009976678,0.00020963362,0.00007559906],"domain_scores_gemma":[0.99892247,0.00028228975,0.00027738503,0.000060455062,0.00034674248,0.0001107006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004103033,0.0003563863,0.0003218241,0.0019759038,0.0007169228,0.0015473893,0.000379613,0.00028197895,0.004133407],"category_scores_gemma":[0.0010758297,0.0002495076,0.00042355215,0.0035924006,0.00046136082,0.0005470077,0.00079499173,0.0005359302,0.00075030647],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019150299,0.000076845026,0.9320926,0.00044478013,0.00014512728,0.00063695136,0.0077393027,0.00066339487,0.010960535,0.0007876563,0.0012229827,0.045038242],"study_design_scores_gemma":[0.000001960862,0.00005028759,0.98060465,0.00003930725,0.000044977278,0.00019020685,0.010076846,0.00040969506,0.0015655608,0.00012965278,0.006873771,0.000012997013],"about_ca_topic_score_codex":0.044786412,"about_ca_topic_score_gemma":0.12629952,"teacher_disagreement_score":0.044786412,"about_ca_system_score_codex":0.00092556304,"about_ca_system_score_gemma":0.0009033818,"threshold_uncertainty_score":0.089051485},"labels":[],"label_agreement":null},{"id":"W4323349768","doi":"10.1155/2023/5257482","title":"Evaluation of Railway Transportation Performance Based on CRITIC-Relative Entropy Method in China","year":2023,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Government of Jiangsu Province","keywords":"Transport engineering; China; Sustainable development; Evaluation methods; Sustainable transport; Engineering; Sustainability","score_opus":0.013872250592038735,"score_gpt":0.27512314330702015,"score_spread":0.2612508927149814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323349768","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75478363,0.00058126886,0.23261917,0.00034187964,0.000056766647,0.00016950945,0.0002956499,0.00015482765,0.010997301],"genre_scores_gemma":[0.99090487,0.000138907,0.008106037,0.000011877906,0.000009776725,0.00005169797,0.00014627914,0.000009280495,0.0006212658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9970682,0.001244217,0.00021207688,0.00028768805,0.0009975688,0.00019026954],"domain_scores_gemma":[0.9964767,0.001747957,0.00039786866,0.00013952417,0.0011143815,0.00012362005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057250303,0.0008888744,0.0008202498,0.0036732452,0.0005756097,0.0015657232,0.0006211456,0.0006315344,0.000996679],"category_scores_gemma":[0.008516757,0.00022864965,0.0009919807,0.002308043,0.0009381821,0.0013748622,0.0011068955,0.0004328394,0.000102165126],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038756971,0.00019028045,0.08356831,0.00048174182,0.00037433227,0.0003276158,0.001018697,0.7847738,0.005407048,0.016083488,0.0015720446,0.10581507],"study_design_scores_gemma":[0.000013149148,0.000114707014,0.022596747,0.00002531755,0.00005774595,0.000035996847,0.00024035336,0.97170657,0.0017390826,0.0030144765,0.0004099975,0.00004579627],"about_ca_topic_score_codex":0.01359673,"about_ca_topic_score_gemma":0.00780562,"teacher_disagreement_score":0.01359673,"about_ca_system_score_codex":0.002336435,"about_ca_system_score_gemma":0.0014286913,"threshold_uncertainty_score":0.030277193},"labels":[],"label_agreement":null},{"id":"W4323530047","doi":"10.37277/stch.v32i4.1470","title":"Kinerja Lalu Lintas Simpang Tak Bersinyal Perkotaan pada Lahan Terbatas (Studi Kasus : Simpang Jl. M. Kahfi II – Jl. Srengseng Sawah, Jakarta Selatan)","year":2022,"lang":"id","type":"article","venue":"Sainstech Jurnal Penelitian dan Pengkajian Sains dan Teknologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.012800022146140651,"score_gpt":0.21431010258333266,"score_spread":0.201510080437192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323530047","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9554909,0.003515988,0.0018579816,0.00036836095,0.00014249321,0.00006290516,0.0008419809,0.00015691332,0.03756248],"genre_scores_gemma":[0.9467817,0.0022486176,0.0037044322,0.00014460008,0.000039414164,0.00006866686,0.00095619727,0.00006951671,0.0459868],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997559,0.000029429479,0.00001611603,0.00006984027,0.0000660575,0.000062690626],"domain_scores_gemma":[0.9998005,0.000031062882,0.00004162437,0.000015762816,0.000058703245,0.000052321007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035760298,0.000607417,0.000383157,0.000486267,0.0011120951,0.0016364191,0.00042334726,0.00036768313,0.012179678],"category_scores_gemma":[0.00024371152,0.00023787466,0.00021009533,0.00059942843,0.00039735567,0.0007110731,0.0008803529,0.0005538218,0.0044564307],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018959694,0.0020308734,0.38994715,0.0018821633,0.00017721388,0.0054927818,0.013549889,0.003915675,0.06831862,0.0055944575,0.014739102,0.49245602],"study_design_scores_gemma":[0.000031820604,0.0009181769,0.83636665,0.00041086215,0.00015378659,0.0025970344,0.022479603,0.0029133947,0.020744069,0.0009734139,0.112293065,0.00011812117],"about_ca_topic_score_codex":0.007462508,"about_ca_topic_score_gemma":0.027688436,"teacher_disagreement_score":0.012179678,"about_ca_system_score_codex":0.00083533424,"about_ca_system_score_gemma":0.0018777379,"threshold_uncertainty_score":0.04074508},"labels":[],"label_agreement":null},{"id":"W4324149913","doi":"10.4324/9780429318856-9","title":"Regulation of air traffic control services","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Air traffic control; Business; Control (management); Transport engineering; Computer science; Engineering; Aerospace engineering; Artificial intelligence","score_opus":0.0068820369681989145,"score_gpt":0.16292074299038733,"score_spread":0.15603870602218842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324149913","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00095791684,0.02249645,0.0052779345,0.0043400596,0.002099161,0.000047392423,0.00022517735,0.000120607394,0.9644353],"genre_scores_gemma":[0.04228354,0.058229495,0.0048806644,0.0060744323,0.002365234,0.00015026852,0.0006250396,0.00022014209,0.8851711],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989096,0.00015113637,0.00002839432,0.00014913856,0.0006663795,0.00009539217],"domain_scores_gemma":[0.99977535,0.00006468924,0.00001788366,0.00002262993,0.000105267696,0.00001420763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049922016,0.0005445928,0.00027565914,0.00091555534,0.0010329098,0.0036964072,0.000654129,0.0016796268,0.020852117],"category_scores_gemma":[0.0008949536,0.00023268661,0.0003368102,0.0014139303,0.0011506572,0.0020476202,0.0007781153,0.0022484644,0.009661517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000065873865,0.000025762096,0.00010026433,0.00016110757,0.0000033726772,0.00003343112,0.00029174288,0.0017386281,0.00059513724,0.74701107,0.1782801,0.07175282],"study_design_scores_gemma":[8.130468e-7,0.0000040585987,0.00017844241,0.00014288891,0.0000011948507,0.00002552726,0.000046020767,0.00032772415,0.00011593135,0.015323092,0.98383015,0.0000042589922],"about_ca_topic_score_codex":0.014117456,"about_ca_topic_score_gemma":0.0120320115,"teacher_disagreement_score":0.020852117,"about_ca_system_score_codex":0.0041347435,"about_ca_system_score_gemma":0.0030112723,"threshold_uncertainty_score":0.06975728},"labels":[],"label_agreement":null},{"id":"W4324264904","doi":"10.25105/agora.v20i2.13835","title":"OPTIMASI PEMANFAATAN JALUR PEJALAN KAKI DI KAWASAN NIAGA TERPADU SUDIRMAN","year":2023,"lang":"id","type":"article","venue":"AGORA Jurnal Penelitian dan Karya Ilmiah Arsitektur Usakti","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Art","score_opus":0.014813653613878723,"score_gpt":0.22547883060140003,"score_spread":0.2106651769875213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324264904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20986758,0.010623559,0.5488562,0.00489321,0.0010389115,0.00055794214,0.0015446733,0.0019820572,0.22063586],"genre_scores_gemma":[0.7664086,0.0057489327,0.13087119,0.0007753543,0.00017224305,0.00040127104,0.0010193852,0.0005280548,0.09407506],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9992506,0.0001350071,0.00004267988,0.0001809778,0.00024624576,0.00014453681],"domain_scores_gemma":[0.9993549,0.00022011284,0.00008624692,0.000062996296,0.00021225393,0.000063405794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090411113,0.0012310375,0.000983409,0.00066828856,0.00082012825,0.0035863516,0.0009438891,0.0011921619,0.021785794],"category_scores_gemma":[0.0018083404,0.00059412164,0.0009084862,0.0005155121,0.0006607894,0.0019897863,0.0014396487,0.0014541543,0.0041882717],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014925577,0.00074508804,0.012211343,0.002963285,0.00035866848,0.00087331416,0.0010017883,0.32232863,0.16964605,0.06424867,0.01730902,0.4068216],"study_design_scores_gemma":[0.00022548457,0.002189907,0.016625393,0.00078538543,0.000486158,0.00090146833,0.0033870311,0.59482765,0.10266947,0.06986722,0.20770934,0.00032554517],"about_ca_topic_score_codex":0.0049225804,"about_ca_topic_score_gemma":0.0067026727,"teacher_disagreement_score":0.021785794,"about_ca_system_score_codex":0.001391562,"about_ca_system_score_gemma":0.0024557984,"threshold_uncertainty_score":0.072880745},"labels":[],"label_agreement":null},{"id":"W4324373936","doi":"10.25105/pdk.v8i2.15392","title":"EVALUASI KONSEP PENGEMBANGAN TAMAN BISNIS BERDASARKAN KARAKTERISTIK KAWASAN CAMPURAN","year":2023,"lang":"en","type":"article","venue":"JURNAL PENELITIAN DAN KARYA ILMIAH LEMBAGA PENELITIAN UNIVERSITAS TRISAKTI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Metropolitan area; Plan (archaeology); Environmental planning; Residential area; Business; Land use; Sustainable development; Geography; Transport engineering; Environmental resource management; Civil engineering; Engineering; Environmental science; Political science","score_opus":0.013794806164973064,"score_gpt":0.21102082793645724,"score_spread":0.19722602177148418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324373936","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67854697,0.0076534245,0.025326723,0.0023658092,0.0003308082,0.00084403646,0.0013988323,0.0003894971,0.283144],"genre_scores_gemma":[0.93651974,0.006261149,0.026549196,0.00023197194,0.000037585043,0.00039543025,0.0009330583,0.00013230125,0.028939536],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9985299,0.0004743373,0.00009609912,0.00013086616,0.0006674203,0.000101396414],"domain_scores_gemma":[0.9974584,0.0008574266,0.0002156448,0.00009804014,0.0012540465,0.000116359384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025841692,0.0008160057,0.0005247551,0.0014922175,0.0009559677,0.0037681854,0.00048622896,0.00045158472,0.02010269],"category_scores_gemma":[0.004601309,0.00027657158,0.00045333154,0.0012681325,0.0010095215,0.0026878868,0.0011537321,0.0008442128,0.0032292258],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011291238,0.0011118257,0.07382542,0.0044575064,0.00021094106,0.0024384353,0.028649883,0.008024897,0.022466647,0.025332721,0.02937057,0.80298203],"study_design_scores_gemma":[0.00011242244,0.0016616996,0.31734136,0.0049046143,0.0006136096,0.003922322,0.15397467,0.01586765,0.038930334,0.03035241,0.4318964,0.00042257717],"about_ca_topic_score_codex":0.003154603,"about_ca_topic_score_gemma":0.007531517,"teacher_disagreement_score":0.02010269,"about_ca_system_score_codex":0.0013106151,"about_ca_system_score_gemma":0.0020871279,"threshold_uncertainty_score":0.06725019},"labels":[],"label_agreement":null},{"id":"W4328025110","doi":"10.5267/j.uscm.2023.2.014","title":"Characteristics of ACs and their impact on the period of issuing the auditor’s report: An Empirical study on Jordanian public shareholding companies","year":2023,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Accounting; Context (archaeology); Audit; Corporate governance; Independence (probability theory); Audit committee; Finance","score_opus":0.03434310672881442,"score_gpt":0.27300506588394063,"score_spread":0.23866195915512622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4328025110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99903095,0.0000924893,0.00005838676,0.000070687005,0.0000020834598,0.0000098577475,0.000058982907,0.0000011796947,0.00067534106],"genre_scores_gemma":[0.99943846,0.00006598297,0.000060345013,0.000015177485,0.000006986755,0.000004972475,0.0000835328,7.9815175e-7,0.00032364976],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99649674,0.0010299433,0.0005065624,0.00030791477,0.0010713112,0.00058757904],"domain_scores_gemma":[0.93127257,0.01680803,0.0380331,0.0013909643,0.008850501,0.0036447945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039544776,0.00012616899,0.00018531797,0.0016219335,0.0006347389,0.0016114947,0.0003070555,0.00035800907,0.0019453816],"category_scores_gemma":[0.019075166,0.00014197164,0.00019175686,0.0020944374,0.00047721702,0.00080918515,0.0006745128,0.00057392125,0.0002876653],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059797338,0.00008396312,0.9918527,0.00001814284,0.00001686711,0.00008985799,0.0010485771,0.00016581392,0.0001347126,0.00010036925,0.00014730745,0.0062819235],"study_design_scores_gemma":[0.0000020524517,0.000078086894,0.9945979,0.000013498866,0.000009863811,0.000067261855,0.003936923,0.00022749443,0.00014839786,0.000035175646,0.00087796507,0.000005318793],"about_ca_topic_score_codex":0.011467353,"about_ca_topic_score_gemma":0.016574226,"teacher_disagreement_score":0.011467353,"about_ca_system_score_codex":0.0015828093,"about_ca_system_score_gemma":0.0026659083,"threshold_uncertainty_score":0.02280122},"labels":[],"label_agreement":null},{"id":"W4361267230","doi":"10.47080/josce.v5i01.2405","title":"ANALISIS DESAIN GEOMETRIK JALAN RAYA PALIMA-PASANG TENENG KABUPATEN SERANG PROVINSI BANTEN","year":2023,"lang":"id","type":"article","venue":"Journal of Sustainable Civil Engineering (JOSCE)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics","score_opus":0.007258829053822999,"score_gpt":0.18985157553078555,"score_spread":0.18259274647696255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361267230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9822197,0.0005086664,0.000473279,0.00006580338,0.000009143926,0.000032177784,0.0022431058,0.000022272454,0.0144258905],"genre_scores_gemma":[0.9832266,0.0004336374,0.0010167614,0.000034880464,0.0000045261245,0.000040144794,0.0018853307,0.000013985883,0.01334414],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996358,0.000058677793,0.00001750293,0.00010551442,0.000112269714,0.00007019471],"domain_scores_gemma":[0.9996325,0.00008503939,0.00007835525,0.000026020823,0.00013917222,0.00003881194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002621001,0.00039673212,0.00023124878,0.0013673955,0.0006938841,0.0011441731,0.00027430215,0.0002692416,0.006240999],"category_scores_gemma":[0.00040649035,0.00017482117,0.00034000786,0.0026005558,0.00034333108,0.00038683502,0.00045390666,0.00032411804,0.0009613502],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017082962,0.00007088768,0.930219,0.00025451038,0.00016299961,0.00080017495,0.006773307,0.0004548754,0.014542124,0.0009583108,0.0013085558,0.044284433],"study_design_scores_gemma":[0.0000011093734,0.000058584224,0.98256487,0.000023428716,0.000028498924,0.00016151453,0.00800861,0.000117310505,0.0010439636,0.00006249601,0.007922961,0.000006703599],"about_ca_topic_score_codex":0.05397674,"about_ca_topic_score_gemma":0.14554031,"teacher_disagreement_score":0.05397674,"about_ca_system_score_codex":0.00068394875,"about_ca_system_score_gemma":0.0005511191,"threshold_uncertainty_score":0.10732514},"labels":[],"label_agreement":null},{"id":"W4367280299","doi":"10.30598/arika.2023.17.1.33","title":"Perkiraan Tarikan Pergerakan Kendaraan Logistik Menuju ke Pulau Seram di Provinsi Maluku","year":2023,"lang":"id","type":"article","venue":"ARIKA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Business; Geography; Political science","score_opus":0.018004002877063403,"score_gpt":0.2149038447589015,"score_spread":0.1968998418818381,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367280299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7333694,0.0035665294,0.11215327,0.005590716,0.00044649484,0.0007162756,0.021869265,0.0031927202,0.11909525],"genre_scores_gemma":[0.88589424,0.0021666293,0.037980605,0.00032952553,0.00007957402,0.00051092583,0.008927222,0.0003717493,0.06373965],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990864,0.00021492438,0.00006043126,0.00025484254,0.00024104318,0.00014236136],"domain_scores_gemma":[0.9984841,0.00055757654,0.0001565864,0.00023425122,0.0004833621,0.000084104824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012696879,0.001059204,0.00092879933,0.0013568056,0.0015268051,0.005333923,0.0011611549,0.0010286826,0.022666723],"category_scores_gemma":[0.0028367108,0.0006651807,0.0012143736,0.0023343407,0.00096767297,0.003326531,0.0017996149,0.0012616892,0.003384941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010591159,0.000705717,0.46845508,0.0027127406,0.00068557565,0.0018024604,0.0111994855,0.054646693,0.019164959,0.09180837,0.03079918,0.31696063],"study_design_scores_gemma":[0.00014913663,0.0005762248,0.39121634,0.0010140353,0.00077183696,0.0012020844,0.024022229,0.102434136,0.017359743,0.03796095,0.42295665,0.00033663283],"about_ca_topic_score_codex":0.06009827,"about_ca_topic_score_gemma":0.07821871,"teacher_disagreement_score":0.06009827,"about_ca_system_score_codex":0.0041964613,"about_ca_system_score_gemma":0.0042150696,"threshold_uncertainty_score":0.11949688},"labels":[],"label_agreement":null},{"id":"W4375868249","doi":"10.22219/skpsppi.v3i1.6607","title":"STUDI KINERJA RUNWAY 3 DAN PENGARUH ADANYA CROSSING TAXIWAY TERHADAP KAPASITAS RUNWAY 2 DI BANDARA INTERNASIONAL SOEKARNO-HATTA","year":2023,"lang":"id","type":"article","venue":"Seminar Keinsinyuran Program Studi Program Profesi Insinyur","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Runway; Physics; Geography","score_opus":0.025828633722869424,"score_gpt":0.2966915031780069,"score_spread":0.2708628694551375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375868249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9740856,0.00070153683,0.0007232071,0.00031047434,0.000075141026,0.00010681842,0.0007971705,0.00003309907,0.023166962],"genre_scores_gemma":[0.94058895,0.0011058735,0.0013491275,0.00018141097,0.000022465543,0.0001772588,0.0009631339,0.000041938074,0.05556984],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99913484,0.00013797633,0.0000659311,0.0002421149,0.0002470574,0.00017214392],"domain_scores_gemma":[0.9983286,0.00049012335,0.00025537057,0.000109309054,0.0005234235,0.00029309333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007416967,0.00039931224,0.0003748948,0.00057136087,0.0010266893,0.0019494977,0.0005497301,0.00068155455,0.016418302],"category_scores_gemma":[0.0019785329,0.00032681721,0.00070313603,0.00077625155,0.00038202686,0.001339366,0.00071353215,0.0011574962,0.0035547568],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020739427,0.002727674,0.77231246,0.0021959457,0.00040008483,0.0019435852,0.03291853,0.001210128,0.014429331,0.0027471886,0.014926027,0.15211506],"study_design_scores_gemma":[0.000031826683,0.0012925839,0.90576357,0.00033022874,0.00027551228,0.0005255494,0.040627908,0.00038188507,0.004363684,0.0006571711,0.04568821,0.00006183624],"about_ca_topic_score_codex":0.009163758,"about_ca_topic_score_gemma":0.029131707,"teacher_disagreement_score":0.016418302,"about_ca_system_score_codex":0.00087275624,"about_ca_system_score_gemma":0.0014164755,"threshold_uncertainty_score":0.054924726},"labels":[],"label_agreement":null},{"id":"W4378514598","doi":"10.29138/spirit.v8i1.2020","title":"KAJIAN REFORMASI DAN PENGEMBANGAN ANGKUTAN DI TENGAH PANDEMI COVID-19 DI KABUPATEN SIDOARJO","year":2022,"lang":"id","type":"article","venue":"E-Jurnal SPIRIT PRO PATRIA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.027336485219876874,"score_gpt":0.25253371513438777,"score_spread":0.2251972299145109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378514598","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.753316,0.006928794,0.022151893,0.010985985,0.0016448989,0.00081952894,0.01053377,0.0007503943,0.19286877],"genre_scores_gemma":[0.89888316,0.004015766,0.010826521,0.0006943258,0.00015368215,0.00029777206,0.004837648,0.00010554737,0.08018552],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99935013,0.00014220053,0.000041096046,0.00010082816,0.00018358206,0.0001821826],"domain_scores_gemma":[0.99936444,0.000108902976,0.000093572846,0.000042963635,0.0002779201,0.000112199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010108978,0.0007287692,0.00055040093,0.0005977531,0.0012773083,0.0028575787,0.00067338016,0.00049724546,0.017642066],"category_scores_gemma":[0.0015655825,0.00039402512,0.00091318216,0.0010598055,0.00050463626,0.0010056228,0.0013969736,0.0013530061,0.0028208809],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011102661,0.0011106769,0.530963,0.0022911495,0.0007468183,0.0020542901,0.008521741,0.023978144,0.011093979,0.04402316,0.05272059,0.32138616],"study_design_scores_gemma":[0.0001752344,0.0010038629,0.5558033,0.0013547246,0.0009249968,0.00092390936,0.026107142,0.030658424,0.007962872,0.009934856,0.3649359,0.0002147365],"about_ca_topic_score_codex":0.10335404,"about_ca_topic_score_gemma":0.180912,"teacher_disagreement_score":0.10335404,"about_ca_system_score_codex":0.0027074483,"about_ca_system_score_gemma":0.00787021,"threshold_uncertainty_score":0.2055049},"labels":[],"label_agreement":null},{"id":"W4378881848","doi":"10.56799/jceki.v1i6.1021","title":"Implementasi Pencegahan Pelanggaran Tata Ruang Dengan Fungsi SKRK dan IMB di Kota Surabaya","year":2022,"lang":"id","type":"article","venue":"J-CEKI Jurnal Cendekia Ilmiah","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Political science; Forestry; Geography; Philosophy","score_opus":0.014598447340735378,"score_gpt":0.22127376626580816,"score_spread":0.2066753189250728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378881848","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20891528,0.0034000557,0.047398906,0.021501893,0.0011519601,0.003314568,0.0016167786,0.0048044845,0.707896],"genre_scores_gemma":[0.56914806,0.0040631825,0.05832549,0.003404932,0.00012793232,0.0017595822,0.0014000598,0.0006419194,0.36112887],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99683595,0.0009252496,0.00015873491,0.00047668573,0.0008586245,0.00074461696],"domain_scores_gemma":[0.9959273,0.0005742933,0.00026509824,0.00052635977,0.0014185972,0.0012882669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038834987,0.0007136355,0.0003384023,0.00069732603,0.0020675224,0.0061656656,0.0013430894,0.0011540256,0.052606],"category_scores_gemma":[0.0056980294,0.00041798383,0.00055949175,0.0009283331,0.0011441709,0.0031817954,0.0036657718,0.0018976189,0.010028793],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006837155,0.002354479,0.027670063,0.0025290856,0.00015225219,0.0016167781,0.025015235,0.001894848,0.015000879,0.069793046,0.06130052,0.79198915],"study_design_scores_gemma":[0.00010946403,0.00077222503,0.027303714,0.00093002146,0.00012791675,0.00033718484,0.018207463,0.0010641908,0.005870256,0.0055615692,0.9396519,0.00006408088],"about_ca_topic_score_codex":0.018518455,"about_ca_topic_score_gemma":0.025733301,"teacher_disagreement_score":0.052606,"about_ca_system_score_codex":0.004803874,"about_ca_system_score_gemma":0.018766953,"threshold_uncertainty_score":0.17598462},"labels":[],"label_agreement":null},{"id":"W4379260959","doi":"10.5267/j.dsl.2023.4.008","title":"Implementation strategy of transit-oriented development based on the bus rapid transit system in Indonesia","year":2023,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bus rapid transit; Transport engineering; Public transport; SWOT analysis; Business; Sustainable development; Sustainable transport; Transit (satellite); Engineering; Sustainability; Marketing","score_opus":0.019292242651315405,"score_gpt":0.24756828883905543,"score_spread":0.22827604618774003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379260959","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92710054,0.0001797128,0.011514196,0.0014788307,0.000038751958,0.0006755855,0.00022673933,0.00014597065,0.05863958],"genre_scores_gemma":[0.9829752,0.00017200212,0.0076500745,0.00007261217,0.0000028465763,0.00011468559,0.00010866511,0.000008323927,0.008895697],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996599,0.00011958417,0.000017728433,0.000044414996,0.00005057542,0.00010785771],"domain_scores_gemma":[0.99974936,0.000018621047,0.000036650283,0.0000132500645,0.000072893075,0.00010908996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004959227,0.00020546364,0.00009700693,0.00035485765,0.00058624696,0.0011981621,0.0004231784,0.00022636811,0.0024257263],"category_scores_gemma":[0.00051720097,0.0001231287,0.00019341242,0.00041805874,0.00021492585,0.00046671947,0.00076846173,0.00034509506,0.00031629848],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005444333,0.0037368466,0.2971457,0.0007626548,0.00011300475,0.005593053,0.0062508797,0.07311471,0.02089355,0.06480066,0.013659923,0.5133845],"study_design_scores_gemma":[0.00042926124,0.0029529645,0.47875756,0.00044536096,0.00028182505,0.0016123,0.03589446,0.25515977,0.019015908,0.010837271,0.19446397,0.0001493794],"about_ca_topic_score_codex":0.019253738,"about_ca_topic_score_gemma":0.026653262,"teacher_disagreement_score":0.019253738,"about_ca_system_score_codex":0.002559781,"about_ca_system_score_gemma":0.006261625,"threshold_uncertainty_score":0.038283348},"labels":[],"label_agreement":null},{"id":"W4379280383","doi":"10.5267/j.uscm.2023.3.021","title":"Corporate image and service quality: Evidence from Indonesia Mass Rapid Transport","year":2023,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Service quality; Business; Customer satisfaction; Marketing; Service (business); Descriptive statistics; Structural equation modeling; Affect (linguistics); Quality (philosophy); Advertising; Psychology; Statistics; Mathematics","score_opus":0.034923536103843446,"score_gpt":0.2385314907187034,"score_spread":0.20360795461485995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379280383","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962984,0.00063424214,0.000041475443,0.00019532874,0.000006711715,0.0000056359195,0.000047935435,8.0668605e-7,0.0027694502],"genre_scores_gemma":[0.9991659,0.0005709903,0.000025973877,0.000029945055,0.0000056291924,0.0000020240816,0.000041389172,7.300459e-7,0.00015744829],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99963224,0.00011453135,0.00003159745,0.00003252618,0.00012612897,0.00006304564],"domain_scores_gemma":[0.9971517,0.00093982695,0.0011526701,0.000080892445,0.00037991803,0.00029501176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006415558,0.00015304156,0.00018675922,0.00089152466,0.00055906764,0.0013066293,0.00022542708,0.00020100187,0.0034535662],"category_scores_gemma":[0.002686425,0.00012397437,0.00019960119,0.001391867,0.00069553166,0.0005570899,0.00059819454,0.0004999335,0.00022437914],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000108900254,0.00027636407,0.97369236,0.00024166914,0.000056767072,0.00037860364,0.004576803,0.00008852625,0.00018879205,0.00052690034,0.0003163388,0.01954798],"study_design_scores_gemma":[0.000003211866,0.00007086689,0.988912,0.00010029467,0.000038260856,0.00015914955,0.009575972,0.00013432637,0.00009288292,0.00005190239,0.0008569834,0.0000040008363],"about_ca_topic_score_codex":0.01802305,"about_ca_topic_score_gemma":0.025159402,"teacher_disagreement_score":0.01802305,"about_ca_system_score_codex":0.0008448235,"about_ca_system_score_gemma":0.00087118964,"threshold_uncertainty_score":0.03583628},"labels":[],"label_agreement":null},{"id":"W4381621760","doi":"10.31315/psb.v4i1.8823","title":"Analisis Kualitas Udara Ambien pada Area Tambang Batubara Jenis Terbuka (Open Pit) PT XX di Desa Sungai Payang, Kecamatan Loa Kulu, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur","year":2023,"lang":"id","type":"article","venue":"Prosiding Seminar Nasional Teknik Lingkungan Kebumian SATU BUMI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Forestry; Geography","score_opus":0.030689165725597174,"score_gpt":0.26088251996670114,"score_spread":0.23019335424110396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381621760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93582344,0.0037432434,0.0035114968,0.0006340687,0.00019212323,0.00029535932,0.007544168,0.0001895072,0.048066575],"genre_scores_gemma":[0.94072497,0.0025580102,0.005964899,0.00035567276,0.000066020875,0.00032563732,0.0040704804,0.00010841356,0.04582599],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991042,0.00014224433,0.00007900955,0.00020068583,0.00032106164,0.00015275499],"domain_scores_gemma":[0.9989361,0.00022216726,0.00018868058,0.000055113785,0.00048717664,0.00011078069],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000611308,0.00057068304,0.0005623089,0.0019103177,0.0012785688,0.002199304,0.0005480053,0.0007380437,0.011375402],"category_scores_gemma":[0.001160235,0.00034191526,0.0007952838,0.002127957,0.0005711902,0.0010398924,0.0010310452,0.0010809025,0.002773771],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007936494,0.00056268164,0.7666924,0.002730703,0.0004176378,0.003339317,0.020236595,0.0011125394,0.03289441,0.00211364,0.014028116,0.15507819],"study_design_scores_gemma":[0.000010972443,0.00032281695,0.89821225,0.00039099672,0.0001806055,0.0011367298,0.04149375,0.0008587748,0.0067407843,0.0007798873,0.049809862,0.000062475076],"about_ca_topic_score_codex":0.017287469,"about_ca_topic_score_gemma":0.041351635,"teacher_disagreement_score":0.017287469,"about_ca_system_score_codex":0.00061775267,"about_ca_system_score_gemma":0.0009446991,"threshold_uncertainty_score":0.038054466},"labels":[],"label_agreement":null},{"id":"W4382797233","doi":"10.52074/skyhawk.v3i1.129","title":"Kajian Fasilitas Unit PKP-PK Sebagai Penunjang Keselamatan Penerbangan Di Bandar Udara Budiarto Curug Tangerang","year":2023,"lang":"id","type":"article","venue":"SKYHAWK Jurnal Aviasi Indonesia","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.0162768273104977,"score_gpt":0.23191024029927612,"score_spread":0.21563341298877842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382797233","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22883591,0.007279326,0.118915856,0.004464555,0.0041581444,0.001179983,0.004897431,0.006789088,0.62347966],"genre_scores_gemma":[0.31584048,0.0045749354,0.058949407,0.00080630893,0.0005435946,0.00048261444,0.0040724985,0.0013176309,0.6134126],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99830544,0.00016958342,0.00011338417,0.00030688735,0.0008708299,0.00023387361],"domain_scores_gemma":[0.997905,0.00025686537,0.00018458547,0.00036157662,0.0010635033,0.00022839785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013930671,0.0009667101,0.00049591565,0.0017153551,0.0016517557,0.0034710155,0.001127246,0.0012330121,0.06537214],"category_scores_gemma":[0.00184219,0.0005760734,0.00057644385,0.0015307355,0.00078283803,0.0023154037,0.0028540972,0.0016975276,0.02661756],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017349827,0.0004527911,0.015075103,0.0016183102,0.00009054828,0.0012207384,0.0029851627,0.002084385,0.19350214,0.021657433,0.06481701,0.69476134],"study_design_scores_gemma":[0.000057867925,0.00081703765,0.027267687,0.00032162826,0.00010377547,0.001566599,0.0023880594,0.0021799873,0.0870448,0.0036887792,0.8744341,0.0001297968],"about_ca_topic_score_codex":0.0034648373,"about_ca_topic_score_gemma":0.004805801,"teacher_disagreement_score":0.06537214,"about_ca_system_score_codex":0.0012320956,"about_ca_system_score_gemma":0.0020954143,"threshold_uncertainty_score":0.21869159},"labels":[],"label_agreement":null},{"id":"W4383001266","doi":"10.14710/jwl.10.1.55-68","title":"Optimasi Rute Pengangkutan Sampah dengan Menggunakan Metode Nearest Neighbour (Studi Kasus: Kabupaten Manokwari, Papua Barat)","year":2022,"lang":"id","type":"article","venue":"Jurnal Wilayah dan Lingkungan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Forestry; Geography","score_opus":0.01338623812811943,"score_gpt":0.21294952985908935,"score_spread":0.19956329173096993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383001266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58915085,0.0075444058,0.3488562,0.0013564223,0.00025952724,0.00034050082,0.0011565568,0.0009862608,0.050349295],"genre_scores_gemma":[0.8988583,0.0018899164,0.08008367,0.000088676854,0.000026923215,0.00010457669,0.0006010978,0.00011385715,0.018232895],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943763,0.00013968542,0.000025590905,0.0001759878,0.00013593762,0.0000851455],"domain_scores_gemma":[0.99932003,0.00040152745,0.000053314743,0.00004522654,0.00014872196,0.00003124531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008532181,0.0006682313,0.0007883478,0.00065576256,0.00084190076,0.0019387973,0.0008906187,0.0008624755,0.006481772],"category_scores_gemma":[0.0023960948,0.00044954446,0.0007702106,0.0011602063,0.00034084535,0.0019434025,0.0006962463,0.0006755228,0.0012424581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061571825,0.00039047905,0.02456346,0.0010220014,0.00031112263,0.000679242,0.0010180132,0.4631884,0.012990572,0.0129241645,0.0066893366,0.47560748],"study_design_scores_gemma":[0.000047888396,0.00058709376,0.02311064,0.00013020395,0.00027429598,0.00090476306,0.0021105648,0.93080103,0.010455434,0.015299281,0.016152773,0.00012602314],"about_ca_topic_score_codex":0.015219377,"about_ca_topic_score_gemma":0.018690914,"teacher_disagreement_score":0.015219377,"about_ca_system_score_codex":0.00094879075,"about_ca_system_score_gemma":0.0011208785,"threshold_uncertainty_score":0.030261636},"labels":[],"label_agreement":null},{"id":"W4383033483","doi":"10.36341/racic.v8i1.3075","title":"OPTIMALISASI KINERJA PERSIMPANGAN TIDAK SEBIDANG PADA KAWASAN PERBELANJAAN MALL SKA – LIVING WORLD (SIMPANG JL. TUANKU TAMBUSAI – JL. SOEKARNO HATTA) DI PEKANBARU","year":2023,"lang":"id","type":"article","venue":"Racic Rab Construction Research","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Political science","score_opus":0.05097183411066949,"score_gpt":0.31667775298845163,"score_spread":0.26570591887778217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383033483","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91282094,0.0057460913,0.015218148,0.00068599917,0.00039899355,0.00042255645,0.0034683861,0.0005290256,0.060709875],"genre_scores_gemma":[0.9356445,0.0028131665,0.016045634,0.0002700126,0.000027416436,0.00031491235,0.0025774722,0.00026267135,0.04204415],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994531,0.00006049272,0.000035961675,0.0001494517,0.00019656714,0.00010440787],"domain_scores_gemma":[0.9997787,0.000043281678,0.000026281674,0.00002387603,0.00008843856,0.000039412662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043585777,0.00083043706,0.0009843169,0.0004499045,0.0007479713,0.0018335108,0.00068062375,0.0007039017,0.0133789135],"category_scores_gemma":[0.000515041,0.00036250317,0.00096643466,0.00046593425,0.0004382154,0.0010590637,0.0010048959,0.0013707647,0.0030761943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002439464,0.00082053756,0.01130707,0.0020477828,0.00014692654,0.000288455,0.0005514624,0.0053515825,0.893063,0.0027013968,0.002765862,0.078516476],"study_design_scores_gemma":[0.0002069666,0.009148623,0.08346798,0.0003992533,0.0007694452,0.000643342,0.003846173,0.012372078,0.7343285,0.0033510146,0.15125191,0.00021475156],"about_ca_topic_score_codex":0.007498374,"about_ca_topic_score_gemma":0.015515166,"teacher_disagreement_score":0.0133789135,"about_ca_system_score_codex":0.0010741716,"about_ca_system_score_gemma":0.0013625927,"threshold_uncertainty_score":0.04475695},"labels":[],"label_agreement":null},{"id":"W4383227349","doi":"10.22373/iqtishadiah.v4i1.2926","title":"MAQASID SYARIAH REVIEW OF KOTA BANDA ACEH QANUN NUMBER 3 OF 2021 CONCERNING PARKING SERVICE FEES ON THE EDGE OF PUBLIC ROADS","year":2023,"lang":"en","type":"article","venue":"Al-Iqtishadiah Jurnal Hukum Ekonomi Syariah","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Revenue; Government (linguistics); Service (business); Normative; Business; Public economics; Economics; Political science; Finance; Marketing; Law","score_opus":0.03511869777120801,"score_gpt":0.2452764592344976,"score_spread":0.21015776146328957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383227349","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004083342,0.8466812,0.0004440194,0.055277526,0.016553307,0.00015536563,0.0008091235,0.0000651887,0.07593104],"genre_scores_gemma":[0.06363768,0.83165824,0.0012629332,0.030504966,0.007059211,0.00010567534,0.00096187904,0.00004714066,0.06476225],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975413,0.00038855703,0.00030955576,0.00013364002,0.001492794,0.00013425994],"domain_scores_gemma":[0.9911334,0.0023149995,0.0008163938,0.0001569407,0.005269992,0.00030834234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002819765,0.00023186542,0.00041422294,0.0035298348,0.0011046991,0.002660715,0.0006479535,0.0014607246,0.009481865],"category_scores_gemma":[0.0070915855,0.00023749168,0.00033066902,0.0029119358,0.0007710287,0.0012898804,0.0006888026,0.0010613707,0.0021378093],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006385184,0.000045643297,0.0018864223,0.013331939,0.00006749014,0.00055138953,0.00071101566,0.00030387728,0.0016317614,0.03400613,0.7523673,0.19503307],"study_design_scores_gemma":[0.0000025851384,0.000010853894,0.0030340203,0.0018908618,0.000021150165,0.00014905195,0.00013974454,0.000030097304,0.00016600218,0.00039557202,0.99415284,0.000007178687],"about_ca_topic_score_codex":0.016069282,"about_ca_topic_score_gemma":0.03046268,"teacher_disagreement_score":0.016069282,"about_ca_system_score_codex":0.0037181955,"about_ca_system_score_gemma":0.01269647,"threshold_uncertainty_score":0.031951547},"labels":[],"label_agreement":null},{"id":"W4384039035","doi":"10.24036/jk.v4i2.363","title":"Transportasi Angkot Rute Sarilamak-Kota Payakumbuh","year":2022,"lang":"en","type":"article","venue":"Jurnal Kronologi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business; Engineering; Transport engineering","score_opus":0.00659528490059086,"score_gpt":0.16112859439244498,"score_spread":0.15453330949185412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384039035","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89352703,0.0017248371,0.0010092059,0.0013029088,0.0002733707,0.00007251517,0.00039649918,0.000044257973,0.10164944],"genre_scores_gemma":[0.9675532,0.0013027866,0.0009972987,0.000195232,0.000029982828,0.000058862737,0.00023451287,0.000024149318,0.029603962],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998629,0.000027667571,0.000008176163,0.000031996322,0.00002743933,0.00004175782],"domain_scores_gemma":[0.99977297,0.00006691653,0.00005240171,0.000018107974,0.000057319005,0.000032270982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002272866,0.00017083515,0.00010296752,0.00031327817,0.0022125442,0.0013911885,0.00027636808,0.0002505484,0.012123585],"category_scores_gemma":[0.0004205277,0.00017639883,0.000098085184,0.0008052614,0.0006119468,0.0009951124,0.0009414918,0.0008056935,0.0009928704],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042495545,0.00025277285,0.36427096,0.0018486002,0.000048638907,0.010151707,0.20252296,0.0007827159,0.015576394,0.11361785,0.021471845,0.26903057],"study_design_scores_gemma":[0.000010730179,0.00019929244,0.28607264,0.00075009314,0.000055542903,0.0037858158,0.17120421,0.0007603854,0.0040571373,0.0024045778,0.53064966,0.000049916223],"about_ca_topic_score_codex":0.010184817,"about_ca_topic_score_gemma":0.026563993,"teacher_disagreement_score":0.012123585,"about_ca_system_score_codex":0.0013354078,"about_ca_system_score_gemma":0.0015896328,"threshold_uncertainty_score":0.040557444},"labels":[],"label_agreement":null},{"id":"W4385079324","doi":"10.35194/momen.v6i1.3144","title":"Studi Lokasi Terminal Penumpang Tipe C Kecamatan Pakuan Ratu Kabupaten Way Kanan Provinsi Lampung","year":2023,"lang":"en","type":"article","venue":"JURNAL MOMEN TEKNIK SIPIL","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Procurement; Public transport; Business; Transport engineering; Population; Marketing; Engineering","score_opus":0.012168227399209492,"score_gpt":0.20914848119746254,"score_spread":0.19698025379825304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385079324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9937961,0.00033745507,0.00005046659,0.0000724126,0.000011843804,0.00001982989,0.00007033747,0.0000026914113,0.005638808],"genre_scores_gemma":[0.9887756,0.0013744176,0.00018513514,0.00008103636,0.00000870209,0.000047886977,0.00016770752,0.000005129716,0.009354323],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99984705,0.000031785778,0.000011162446,0.00003483562,0.00004147941,0.00003363978],"domain_scores_gemma":[0.9997595,0.00005703393,0.00005053581,0.0000127943185,0.000049516977,0.00007074031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034273902,0.00021818587,0.00025375106,0.00047049287,0.00085690117,0.001163392,0.00026628588,0.00025013738,0.0052313944],"category_scores_gemma":[0.00046903326,0.00024544413,0.00017521717,0.000541496,0.00028496454,0.00063281954,0.00038670158,0.00045725008,0.0011732202],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001531628,0.0011796453,0.885933,0.00045515993,0.000062390136,0.0043338905,0.055104543,0.00009348012,0.0034176428,0.0011765958,0.0048091,0.043281283],"study_design_scores_gemma":[0.0000056387184,0.00029140324,0.9037004,0.00017564623,0.0000544876,0.0014952573,0.07860677,0.00018131951,0.0008227931,0.00015859374,0.014493408,0.000014260754],"about_ca_topic_score_codex":0.0054339487,"about_ca_topic_score_gemma":0.020702476,"teacher_disagreement_score":0.0054339487,"about_ca_system_score_codex":0.00039407943,"about_ca_system_score_gemma":0.00058944896,"threshold_uncertainty_score":0.017500699},"labels":[],"label_agreement":null},{"id":"W4385423310","doi":"10.25105/bhuwana.v3i1.13315","title":"KARAKTERISTIK PELAYANAN MIKROLET 09A (TANAH ABANG – KEBAYORAN LAMA)","year":2023,"lang":"en","type":"article","venue":"JURNAL BHUWANA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Public transport; Plan (archaeology); Master plan; Flexibility (engineering); Business; Service (business); Community service; Transport engineering; Operations management; Marketing; Geography; Engineering; Public relations; Political science; Environmental planning; Management; Economics; Archaeology","score_opus":0.008121202730489491,"score_gpt":0.18831469709124407,"score_spread":0.18019349436075457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385423310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9463026,0.0005353867,0.0009380249,0.00061762804,0.00005383401,0.00007097488,0.0004874544,0.000033116645,0.050961003],"genre_scores_gemma":[0.9886567,0.00029792837,0.0007030701,0.00005651905,0.000007659715,0.00003848905,0.0002976367,0.0000093333265,0.009932593],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99984705,0.000025695828,0.00000832789,0.000023837572,0.00002886102,0.00006614182],"domain_scores_gemma":[0.99988484,0.000026419168,0.000025487685,0.0000071561067,0.00003334909,0.000022700024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002390818,0.00030723854,0.00017298078,0.0004998673,0.0018864243,0.0013006515,0.0003089663,0.00032434092,0.014320954],"category_scores_gemma":[0.00033612584,0.00017130656,0.00020973227,0.00091304514,0.0007754901,0.00062865845,0.0010207876,0.000454188,0.0012376868],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011378329,0.00038409003,0.46554998,0.0016996114,0.00011186903,0.020355329,0.07887573,0.0019121715,0.036709506,0.046688467,0.019529909,0.3270456],"study_design_scores_gemma":[0.00002721533,0.00024064365,0.6493035,0.00033744174,0.00006209982,0.0055578845,0.18401304,0.0018226705,0.003548381,0.0030312364,0.1519957,0.000060217397],"about_ca_topic_score_codex":0.020348312,"about_ca_topic_score_gemma":0.047788538,"teacher_disagreement_score":0.020348312,"about_ca_system_score_codex":0.0014010612,"about_ca_system_score_gemma":0.0014168682,"threshold_uncertainty_score":0.047908306},"labels":[],"label_agreement":null},{"id":"W4385973789","doi":"10.5267/j.uscm.2023.7.020","title":"The influence of implementing electronic flight bag application on aviation safety mediated by the optimization of human resources","year":2023,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cockpit; Aviation; Aviation safety; Aeronautics; Computer science; Engineering; Aerospace engineering","score_opus":0.004185540474098466,"score_gpt":0.20635133094554012,"score_spread":0.20216579047144165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385973789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9945692,0.00007292227,0.0006146597,0.00023752627,0.0000061120327,0.000040878887,0.00004461344,0.000007937062,0.004406169],"genre_scores_gemma":[0.99882716,0.00009137055,0.0005183484,0.0000208898,0.0000025484103,0.000018830151,0.000022946,0.000002712391,0.00049516873],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967301,0.0019468691,0.000118300275,0.00024935565,0.00036982677,0.0005854259],"domain_scores_gemma":[0.9842017,0.009734629,0.0034692578,0.00035211156,0.001023011,0.001219337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015855831,0.00039849352,0.00019439212,0.000820588,0.00073156477,0.0018504744,0.00037627312,0.00043187785,0.006141106],"category_scores_gemma":[0.010107152,0.00019028372,0.0004487021,0.00076244393,0.0009900687,0.0008993106,0.001293363,0.0006159733,0.00030989174],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039288963,0.001115045,0.9232222,0.0002535825,0.0002552272,0.00064955256,0.008427034,0.006032316,0.0017439469,0.0044424883,0.000766883,0.052698914],"study_design_scores_gemma":[0.000026230538,0.0008694106,0.9709445,0.00017334394,0.00015560025,0.000105042796,0.015709003,0.0071391747,0.0009334471,0.0012042245,0.0027037945,0.000036228084],"about_ca_topic_score_codex":0.009889609,"about_ca_topic_score_gemma":0.0113289645,"teacher_disagreement_score":0.009889609,"about_ca_system_score_codex":0.0018015913,"about_ca_system_score_gemma":0.0041397456,"threshold_uncertainty_score":0.020543993},"labels":[],"label_agreement":null},{"id":"W4386010711","doi":"10.5267/j.ijdns.2023.7.018","title":"Passenger perception of commuter line service quality in Indonesia","year":2023,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Varimax rotation; Service quality; Transport engineering; Service (business); Quality (philosophy); Level of service; Ticket; Business; Marketing; Computer science; Engineering; Computer security","score_opus":0.04848446202378652,"score_gpt":0.32437646876361365,"score_spread":0.2758920067398271,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386010711","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99829227,0.00004293998,0.00007650639,0.00009401476,0.0000040301484,0.0000023117514,0.000031386273,0.0000020163802,0.0014544755],"genre_scores_gemma":[0.99964356,0.000050730432,0.000025513535,0.000017559878,0.0000016538722,8.9014634e-7,0.000014668358,6.429688e-7,0.00024482567],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997601,0.0000726051,0.000020356343,0.00002246453,0.00007758409,0.00004692663],"domain_scores_gemma":[0.99942744,0.00009953809,0.00021317088,0.000013073986,0.00012769393,0.0001191574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034796292,0.00010993913,0.00012784095,0.00027272242,0.00037595077,0.0010174918,0.000091678274,0.0001713149,0.0025656156],"category_scores_gemma":[0.00093573524,0.00006271343,0.00013299957,0.0003001707,0.00028021898,0.00043869912,0.00029087905,0.00033218693,0.0001797767],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011611595,0.00011188145,0.9395362,0.00010944825,0.00003433753,0.0010804932,0.03343146,0.00036067673,0.004038827,0.0005391403,0.00093512324,0.019706301],"study_design_scores_gemma":[0.0000028068293,0.00012748847,0.90461093,0.000037831967,0.000017455905,0.00041896247,0.091291554,0.000823089,0.00040879808,0.00009284373,0.0021517877,0.00001639538],"about_ca_topic_score_codex":0.012518303,"about_ca_topic_score_gemma":0.012768109,"teacher_disagreement_score":0.012518303,"about_ca_system_score_codex":0.0004764296,"about_ca_system_score_gemma":0.00020464014,"threshold_uncertainty_score":0.0248909},"labels":[],"label_agreement":null},{"id":"W4386069737","doi":"10.26760/rekaracana.v9i2.80","title":"Model Penurunan Umur Layan terhadap Perubahan Nilai Parameter Desain Perkerasan Lentur dan Perkerasan Kaku Runway Bandar Udara","year":2023,"lang":"id","type":"article","venue":"RekaRacana Jurnal Teknil Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Subgrade; Materials science; Composite material; Physics; Geotechnical engineering; Engineering","score_opus":0.026547919935862443,"score_gpt":0.23827138641942563,"score_spread":0.2117234664835632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386069737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26625603,0.0012429074,0.57580775,0.0013636985,0.00060586917,0.0003087096,0.008083381,0.008806912,0.13752478],"genre_scores_gemma":[0.82461727,0.0012421831,0.051659074,0.00022964124,0.00006524452,0.0004059519,0.005926051,0.0013080352,0.114546515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998067,0.000025159245,0.000011251717,0.00005404436,0.000074026306,0.000028873483],"domain_scores_gemma":[0.99976367,0.00004851523,0.00002121611,0.000028927721,0.00012166766,0.00001597673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029272746,0.0009789407,0.0007457052,0.00048906164,0.00058346835,0.0019654077,0.0012103278,0.0011622277,0.018399378],"category_scores_gemma":[0.00065248966,0.0005394961,0.0010993859,0.00058188476,0.0003231486,0.0016190205,0.00081514457,0.0010756493,0.0050543724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021890525,0.00015878986,0.00929815,0.0004843817,0.00009969107,0.0002481101,0.00038131452,0.87496966,0.020627113,0.008597199,0.011669993,0.07324675],"study_design_scores_gemma":[0.000033772347,0.00012247122,0.0048007234,0.000089737754,0.000090474525,0.00009987082,0.0003419633,0.9390313,0.009442468,0.0038317216,0.04204785,0.00006764148],"about_ca_topic_score_codex":0.022012789,"about_ca_topic_score_gemma":0.02073777,"teacher_disagreement_score":0.022012789,"about_ca_system_score_codex":0.00083606126,"about_ca_system_score_gemma":0.0016519891,"threshold_uncertainty_score":0.061552107},"labels":[],"label_agreement":null},{"id":"W4386541933","doi":"10.29313/bcsurp.v3i2.7755","title":"Kajian Kinerja Smart Mobility pada Mikrotrans di DKI Jakarta","year":2023,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Public transport; Transport engineering; Conformity; Government (linguistics); Mass transportation; Business; Process (computing); Conformity assessment; Operations management; Computer science; Engineering; Political science","score_opus":0.03456589133963011,"score_gpt":0.22696121368538758,"score_spread":0.19239532234575746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386541933","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2911392,0.018496305,0.011671146,0.014121209,0.003562378,0.00033406535,0.004241049,0.0011204669,0.6553142],"genre_scores_gemma":[0.7042382,0.0114673255,0.010766326,0.00094524643,0.00025445572,0.00019165715,0.0016962348,0.00018366602,0.27025694],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99954045,0.00006844843,0.00003443064,0.00008372046,0.00014457086,0.00012839126],"domain_scores_gemma":[0.9995413,0.00007048146,0.000056364363,0.00003073445,0.00015748099,0.00014366525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036380056,0.0006204696,0.00031680363,0.0007635665,0.0025015168,0.0031676213,0.0005498412,0.0005113773,0.04212207],"category_scores_gemma":[0.00069703296,0.0002893506,0.00029395882,0.00089116493,0.0007490448,0.0012232,0.0020946446,0.00097175146,0.008000488],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010827801,0.0007043463,0.07956605,0.0031443744,0.00010522786,0.004115088,0.006440636,0.0048575294,0.025832575,0.07569405,0.18170545,0.61675197],"study_design_scores_gemma":[0.000028874516,0.00016740103,0.090127476,0.00083246164,0.00009125928,0.0020417138,0.008087006,0.0036354188,0.009308336,0.0033086427,0.88221735,0.00015401555],"about_ca_topic_score_codex":0.024904741,"about_ca_topic_score_gemma":0.047808092,"teacher_disagreement_score":0.04212207,"about_ca_system_score_codex":0.0024101324,"about_ca_system_score_gemma":0.0043023895,"threshold_uncertainty_score":0.14091235},"labels":[],"label_agreement":null},{"id":"W4386695944","doi":"10.55678/jia.v11i2.1141","title":"PARTISIPASI MASYARAKATtTERHADAP PERENCANAAN PEMBANGUNAN INFRASTRUKTUR DI DESAaMARIOo KECAMATAN KULOoKABUPATEN SIDENRENG RAPPANG","year":2023,"lang":"id","type":"article","venue":"JIA Jurnal Ilmiah Administrasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Psychology; Art","score_opus":0.020858618083712557,"score_gpt":0.2399160980806519,"score_spread":0.21905747999693934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386695944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65637475,0.0060618934,0.14076133,0.0030626927,0.00238069,0.0029996748,0.034635007,0.010601091,0.14312282],"genre_scores_gemma":[0.67113787,0.0035202936,0.12217164,0.0013365924,0.00027061815,0.002046999,0.04897677,0.0020214526,0.14851779],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9960226,0.00070072076,0.00026398373,0.0009203636,0.0016390763,0.00045338165],"domain_scores_gemma":[0.99516547,0.0011400398,0.00055075355,0.0009403956,0.0017791652,0.00042419138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051711546,0.0012281283,0.0012738137,0.001970238,0.0022616412,0.0034071656,0.0011870606,0.0010781392,0.020782305],"category_scores_gemma":[0.0049805255,0.00090498466,0.0015167977,0.0022672745,0.00093659776,0.0014124971,0.0020015247,0.0016472231,0.009838869],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0052500414,0.0011039219,0.13074614,0.0020865265,0.0005487274,0.0010556253,0.0014122776,0.013923047,0.194693,0.005443434,0.03949575,0.60424155],"study_design_scores_gemma":[0.00030679136,0.0026637327,0.21320623,0.00035879825,0.0006497462,0.00093872554,0.002768867,0.030992227,0.28952035,0.0045035696,0.4537416,0.00034936375],"about_ca_topic_score_codex":0.025302365,"about_ca_topic_score_gemma":0.050054174,"teacher_disagreement_score":0.025302365,"about_ca_system_score_codex":0.0021631802,"about_ca_system_score_gemma":0.0050572143,"threshold_uncertainty_score":0.06952369},"labels":[],"label_agreement":null},{"id":"W4386999298","doi":"10.46730/japs.v4i1.92","title":"Perencanaan Perbaikan Infrastruktur Jalan Oleh Pemerintah Kota Pekanbaru Tahun 2023","year":2023,"lang":"id","type":"article","venue":"Jurnal Administrasi Politik dan Sosial","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.016307335817294433,"score_gpt":0.24514456450042768,"score_spread":0.22883722868313325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386999298","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14361562,0.0035663,0.011150057,0.012371119,0.0013247431,0.0006274806,0.022700766,0.004135095,0.8005088],"genre_scores_gemma":[0.43959245,0.0047472757,0.014578367,0.0016755274,0.00032658098,0.000625815,0.018378971,0.0012030542,0.5188719],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978801,0.00029804886,0.00008968906,0.0002896825,0.00097308063,0.00046948378],"domain_scores_gemma":[0.9955799,0.00052436127,0.0004116332,0.0005352626,0.0019195911,0.0010292802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018116221,0.0005980526,0.00036723088,0.0022724895,0.0022132,0.006437319,0.0010403844,0.00086041435,0.056409143],"category_scores_gemma":[0.0029119125,0.00052143424,0.00048797272,0.0038851867,0.0008471996,0.0026572996,0.0038082134,0.0017521124,0.023120852],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006615797,0.00046542243,0.093995415,0.0017400151,0.000109128385,0.00077216234,0.006712967,0.0024795593,0.013864844,0.020987637,0.24424814,0.61396325],"study_design_scores_gemma":[0.000018889059,0.00011202946,0.101719484,0.00023801855,0.000041282372,0.00020912918,0.004094492,0.0006638542,0.0032468468,0.0010890686,0.88852036,0.00004645115],"about_ca_topic_score_codex":0.06688777,"about_ca_topic_score_gemma":0.09261905,"teacher_disagreement_score":0.06688777,"about_ca_system_score_codex":0.004134406,"about_ca_system_score_gemma":0.010900965,"threshold_uncertainty_score":0.18870741},"labels":[],"label_agreement":null},{"id":"W4387401624","doi":"10.59934/jaiea.v3i1.343","title":"Binjai Train Ticket Counter Queue Simulation Using Weibull Service Distribution","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence and Engineering Applications (JAIEA)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Ticket; Weibull distribution; Queueing theory; Queue; Computer science; Service (business); Operations research; Simulation; Real-time computing; Engineering; Computer network; Mathematics; Statistics","score_opus":0.039940273619275934,"score_gpt":0.26761819594519975,"score_spread":0.22767792232592382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387401624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6969614,0.00032832244,0.28422153,0.00043970274,0.00012211631,0.00026062288,0.0016293869,0.0017624471,0.014274413],"genre_scores_gemma":[0.95802194,0.00026339333,0.037126992,0.00003492486,0.000013437433,0.00017837164,0.0006600135,0.00006238647,0.0036384433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970216,0.00008377009,0.000027078984,0.000047375488,0.00006332013,0.000076314725],"domain_scores_gemma":[0.99930966,0.0003560152,0.00007928548,0.000046899488,0.00016151271,0.000046500445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066459074,0.0004675069,0.00046486993,0.0009662156,0.00065908703,0.00095776696,0.00083244266,0.00064084935,0.0026712015],"category_scores_gemma":[0.0013108735,0.00030776535,0.00080349576,0.0013316801,0.0002165131,0.0007246793,0.00050696585,0.0007323411,0.00028336066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006681647,0.00006498483,0.0045577222,0.00002705839,0.000023863784,0.000039067818,0.00005895476,0.985932,0.0006627242,0.0027136018,0.0004945301,0.005358691],"study_design_scores_gemma":[0.0000033477804,0.000010225555,0.00032703104,0.0000017674419,0.0000034406926,0.000003495856,0.000014237304,0.9991136,0.00015822652,0.00018518924,0.00017533096,0.000004124718],"about_ca_topic_score_codex":0.04911168,"about_ca_topic_score_gemma":0.027206242,"teacher_disagreement_score":0.04911168,"about_ca_system_score_codex":0.0013977048,"about_ca_system_score_gemma":0.0018186261,"threshold_uncertainty_score":0.0976516},"labels":[],"label_agreement":null},{"id":"W4387543643","doi":"10.24114/jip.v3i1.49817","title":"Analisa Pengaruh Kendaraan Muatan Berlebih/Overloading (OL) terhadap Umur Rencana Perkerasan Jalan Tol (Studi Kasus Ruas Jalan Tol Semarang ABC)","year":2023,"lang":"id","type":"article","venue":"Jurnal Insinyur Profesional","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Research (Canada)","funders":"","keywords":"Physics","score_opus":0.026829106153526405,"score_gpt":0.2556780009533423,"score_spread":0.2288488947998159,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387543643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7277448,0.025100432,0.01927745,0.011931137,0.0013709473,0.002455498,0.016019342,0.0012018379,0.19489855],"genre_scores_gemma":[0.8950619,0.011598966,0.013052876,0.00263594,0.00034281882,0.0016105388,0.004930322,0.00044058712,0.070326105],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9938775,0.0015196681,0.00089519017,0.00064788974,0.0025218897,0.0005379643],"domain_scores_gemma":[0.9779668,0.009792756,0.0033878009,0.0011169171,0.006656651,0.0010791476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066229897,0.00066334417,0.0008431644,0.002643377,0.00159848,0.004406821,0.0010594124,0.00082245807,0.025480501],"category_scores_gemma":[0.021505903,0.00037493446,0.0013124708,0.0023968962,0.0009429061,0.0029104785,0.0019159055,0.0015567287,0.004683278],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028645403,0.00087297824,0.3085313,0.010787271,0.00068454235,0.001346601,0.04102,0.00083317887,0.0057114162,0.00925877,0.068017684,0.5500718],"study_design_scores_gemma":[0.00018347171,0.0015867904,0.54122025,0.006263955,0.0015524772,0.0018393704,0.06579702,0.0013160182,0.0078036035,0.00802244,0.36416444,0.00025015767],"about_ca_topic_score_codex":0.011039941,"about_ca_topic_score_gemma":0.020024456,"teacher_disagreement_score":0.025480501,"about_ca_system_score_codex":0.0024537165,"about_ca_system_score_gemma":0.004471285,"threshold_uncertainty_score":0.08524078},"labels":[],"label_agreement":null},{"id":"W4387575998","doi":"10.33603/jgst.v7i2.26","title":"Analysis of Fares and Subsidy Needs for Public Transportation using The Vehicle Operating Cost Approach (Case Study: Corridor 2 Trans Cirebon)","year":2023,"lang":"en","type":"article","venue":"Journal of Green Science and Technology","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Subsidy; Public transport; Business; Government (linguistics); Transport engineering; Willingness to pay; Service (business); Value (mathematics); Operating cost; Engineering; Economics; Mathematics; Marketing; Microeconomics; Statistics","score_opus":0.042942978801724645,"score_gpt":0.2684484473724535,"score_spread":0.22550546857072884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387575998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9856339,0.00005036751,0.0025091304,0.00011978054,0.0000048141223,0.000082905644,0.00041291252,0.000012697756,0.01117352],"genre_scores_gemma":[0.9940573,0.00007284463,0.0025204693,0.000007787646,0.0000023633258,0.000052544136,0.00024342429,0.0000063788025,0.003036861],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907887,0.00034361763,0.000026333402,0.00010849282,0.00022644496,0.00021627877],"domain_scores_gemma":[0.9985688,0.00073092274,0.00021097543,0.00006431227,0.00032318837,0.00010186404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011685197,0.00041425845,0.00031432317,0.0016386868,0.00051970175,0.0014709479,0.0006409327,0.0009585429,0.0037870493],"category_scores_gemma":[0.0020909938,0.000256751,0.0008931192,0.0017984915,0.0004569283,0.0009867939,0.00061487296,0.00072651455,0.00018962754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010348688,0.001515413,0.24119766,0.00053553586,0.00025975666,0.007281232,0.002563233,0.6262949,0.007641145,0.05733416,0.004131059,0.050211094],"study_design_scores_gemma":[0.000102911115,0.001333163,0.42736804,0.00013473298,0.00019740016,0.0013258698,0.023367014,0.52407855,0.0029382764,0.005408607,0.013557146,0.00018826051],"about_ca_topic_score_codex":0.06246079,"about_ca_topic_score_gemma":0.08724826,"teacher_disagreement_score":0.06246079,"about_ca_system_score_codex":0.005941576,"about_ca_system_score_gemma":0.0020716114,"threshold_uncertainty_score":0.12419444},"labels":[],"label_agreement":null},{"id":"W4387848439","doi":"10.23960/snip.v3i2.430","title":"KAJIAN GEOMETRIK SIMPANG EMPAT BANDAR JAYA TERKAIT DENGAN PENGOPERASIAN LAMPU LALU LINTAS (TRAFFIC LIGHT)/ALAT PEMBERI ISYARAT LALU LINTAS (APILL)","year":2023,"lang":"id","type":"article","venue":"Seminar Nasional Insinyur Profesional (SNIP)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada); WiLAN (Canada)","funders":"Universitas Lampung","keywords":"Physics; Forestry; Humanities; Geography; Art","score_opus":0.017585658279685668,"score_gpt":0.24865521775983448,"score_spread":0.23106955948014882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387848439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61425847,0.0018381169,0.11699829,0.00078423135,0.00021654776,0.00017815868,0.003162053,0.0020742286,0.26048988],"genre_scores_gemma":[0.8717923,0.00094372086,0.027630754,0.00015075994,0.00004677488,0.00015803981,0.0018783638,0.0006153578,0.09678399],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995969,0.0000345839,0.000015749358,0.00013913486,0.00012903597,0.0000846178],"domain_scores_gemma":[0.9996934,0.000044510794,0.000053196087,0.000041659383,0.00013338162,0.000034014014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000259399,0.0009283782,0.00047489817,0.0011016594,0.0014276446,0.0037810237,0.00048005188,0.00064594805,0.03544722],"category_scores_gemma":[0.00046756107,0.00044480697,0.00063494133,0.0010829072,0.0006043245,0.001350333,0.0012535964,0.000716488,0.00890148],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008822155,0.00034363975,0.10915155,0.0012639178,0.00020729395,0.0013679909,0.0041639917,0.035208575,0.28617555,0.048834424,0.021160042,0.49124077],"study_design_scores_gemma":[0.00007230557,0.00054363033,0.4326842,0.00025351052,0.00033536358,0.004416239,0.020255309,0.066635184,0.09429179,0.029600257,0.35054633,0.00036593006],"about_ca_topic_score_codex":0.009467496,"about_ca_topic_score_gemma":0.012245444,"teacher_disagreement_score":0.03544722,"about_ca_system_score_codex":0.0010896075,"about_ca_system_score_gemma":0.00085056043,"threshold_uncertainty_score":0.118582726},"labels":[],"label_agreement":null},{"id":"W4388636525","doi":"10.59900/ptrkjj.v1i1.23","title":"ANALISIS KEBUTUHANAN RUANG PARKIR (STUDI KASUS PUSAT PERBELANJAAN MENTAYA ( PPM ) KOTA SAMPIT KABUPATEN KOTAWARINGIN TIMUR, KALIMANTAN TENGAH)","year":2021,"lang":"id","type":"article","venue":"Jurnal Penelitian Jalan dan Jembatan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Forestry; Physics; Geoprocessing; Mathematics; Environmental science; Geography; Cartography","score_opus":0.01508328979940334,"score_gpt":0.2200558368024146,"score_spread":0.20497254700301126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388636525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98465073,0.0018024781,0.0004202596,0.0003167878,0.00003860833,0.00013504477,0.0023641577,0.000019218578,0.010252758],"genre_scores_gemma":[0.98539335,0.0010265339,0.00072690565,0.00013327028,0.000013623028,0.00015271822,0.0012072305,0.00001626163,0.011330157],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99935573,0.00014525194,0.00006019753,0.00012811742,0.00015397539,0.00015677002],"domain_scores_gemma":[0.99897015,0.00029815544,0.00025362638,0.00006336506,0.000255454,0.00015930462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008568395,0.0003192255,0.00039603983,0.00091194134,0.0009874814,0.0014760154,0.00048090605,0.00039085303,0.006576939],"category_scores_gemma":[0.0015292568,0.00023454067,0.000603708,0.0014337992,0.0005101757,0.0008654188,0.0010443934,0.0006215803,0.00078093953],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043133638,0.00022918788,0.9019326,0.0014492596,0.00031523706,0.001294706,0.03096477,0.00015132886,0.0036054098,0.0016485207,0.0040185633,0.053959154],"study_design_scores_gemma":[0.000006739782,0.0001823851,0.94466347,0.00017965546,0.00011543434,0.00036260195,0.04223044,0.00007968179,0.00065688073,0.00016016267,0.01134763,0.000014900174],"about_ca_topic_score_codex":0.032170642,"about_ca_topic_score_gemma":0.09474694,"teacher_disagreement_score":0.032170642,"about_ca_system_score_codex":0.0009705204,"about_ca_system_score_gemma":0.00144515,"threshold_uncertainty_score":0.06396681},"labels":[],"label_agreement":null},{"id":"W4388681103","doi":"10.33087/jiubj.v23i3.4546","title":"Rekomendasi Rencana Anggaran Biaya dari Audit Keselamatan Jalan Tahap Detail Engineering Design (DED) pada Jalan Nasional Provinsi Jambi","year":2023,"lang":"en","type":"article","venue":"Jurnal Ilmiah Universitas Batanghari Jambi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Audit; Transport engineering; Traffic engineering; Computer science; Engineering; Business; Accounting","score_opus":0.014276124389879808,"score_gpt":0.1771376465618282,"score_spread":0.1628615221719484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388681103","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8460259,0.0053928923,0.015016801,0.0024802203,0.00046390292,0.001045076,0.0039676563,0.0008413891,0.124766186],"genre_scores_gemma":[0.87696034,0.003532271,0.024238478,0.00027800928,0.00004174184,0.0003987129,0.0026823378,0.0001352758,0.09173298],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988368,0.00022265801,0.00008008727,0.00011428186,0.00057649094,0.00016963921],"domain_scores_gemma":[0.99802375,0.0003005693,0.0002929396,0.00019300805,0.0010575465,0.00013216595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016106255,0.000419339,0.00028850962,0.0018633414,0.0014477293,0.002019847,0.0005443186,0.0004306831,0.015257561],"category_scores_gemma":[0.0028835603,0.00048043253,0.00032342013,0.0017112691,0.00040958406,0.000504905,0.0008176309,0.0005067009,0.0027452623],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008557426,0.0007343249,0.16546898,0.0028921966,0.0001265278,0.0022716739,0.0046330895,0.016809117,0.023322051,0.0203441,0.04749709,0.71504515],"study_design_scores_gemma":[0.0000677183,0.0007583201,0.43951055,0.00097478146,0.00016669756,0.0018791967,0.010595674,0.007978075,0.01830337,0.0027186556,0.516916,0.00013089082],"about_ca_topic_score_codex":0.022162791,"about_ca_topic_score_gemma":0.06068627,"teacher_disagreement_score":0.022162791,"about_ca_system_score_codex":0.0026873683,"about_ca_system_score_gemma":0.007440614,"threshold_uncertainty_score":0.051041663},"labels":[],"label_agreement":null},{"id":"W4389030860","doi":"10.30598/isometri.2023.2.2.147-153","title":"ANALISIS PROPORSI PILIHAN JENIS ANGKUTAN UNTUK PERJALANAN KOMUTER (STUDI KASUS : PADA RUTE LEIHITU – KOTA AMBON)","year":2023,"lang":"id","type":"article","venue":"Jurnal ISOMETRI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.017171804780596333,"score_gpt":0.22790689770866657,"score_spread":0.21073509292807024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389030860","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98995155,0.000629036,0.00011679104,0.00018435839,0.00002025668,0.00003933363,0.0003560738,0.0000052136747,0.008697361],"genre_scores_gemma":[0.98446435,0.000802257,0.0002948826,0.00012818299,0.000010587106,0.000083533174,0.0003408347,0.00001088168,0.013864461],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992743,0.00017922091,0.00004901973,0.00014308644,0.00016781295,0.00018650178],"domain_scores_gemma":[0.9985782,0.00046656883,0.00031572938,0.000068595014,0.00032320622,0.0002477151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088652637,0.0002865646,0.00044319627,0.0008011841,0.001310981,0.0022138003,0.0006092434,0.0004609507,0.009063389],"category_scores_gemma":[0.0018882953,0.00028685082,0.00040382866,0.0014877737,0.00070300366,0.0011948313,0.0015677059,0.0011547672,0.0013923608],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004797014,0.00042446415,0.81609166,0.0007811086,0.00016413497,0.0011245455,0.12323302,0.00010766236,0.0018863814,0.002900961,0.0033597178,0.049446512],"study_design_scores_gemma":[0.000007020258,0.00016578818,0.8211496,0.00022390533,0.00007300306,0.00020997242,0.16703065,0.00008439134,0.00034802247,0.0001866757,0.010507179,0.000013756157],"about_ca_topic_score_codex":0.036051165,"about_ca_topic_score_gemma":0.07677347,"teacher_disagreement_score":0.036051165,"about_ca_system_score_codex":0.0015564752,"about_ca_system_score_gemma":0.0017048386,"threshold_uncertainty_score":0.07168263},"labels":[],"label_agreement":null},{"id":"W4389031053","doi":"10.30598/isometri.2023.2.2.96-106","title":"PENGARUH BANDAR UDARA INTERNASIONAL PATTIMURA AMBON TERHADAP PERUBAHAN FISIK DAN SOSIAL EKONOMI KAWASAN SEKITAR","year":2023,"lang":"id","type":"article","venue":"Jurnal ISOMETRI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WiLAN (Canada)","funders":"","keywords":"Physics; Humanities; Art","score_opus":0.017909686605163937,"score_gpt":0.230726211988144,"score_spread":0.21281652538298007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389031053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9025727,0.0058689327,0.013758074,0.0017130316,0.0001634201,0.00019094217,0.0011873826,0.00032955513,0.07421594],"genre_scores_gemma":[0.9249793,0.0043648817,0.010630481,0.00033404928,0.000055489934,0.00021290584,0.0010265135,0.000116581155,0.05827978],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99944276,0.00011316466,0.000025137619,0.00014666734,0.00015020603,0.000122050515],"domain_scores_gemma":[0.9991447,0.00019734427,0.00018402333,0.00009273372,0.00027015468,0.0001110233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070148887,0.0007744669,0.00053554465,0.0012164697,0.0015611909,0.0031756805,0.00066513475,0.00089488586,0.022026805],"category_scores_gemma":[0.0012748016,0.000424515,0.0007244801,0.0015948168,0.0009340144,0.0015631812,0.0021363075,0.0009763918,0.004641161],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001559353,0.00060508074,0.33048424,0.0032112238,0.0005308683,0.0030695922,0.020025296,0.0041286345,0.14836238,0.010537804,0.008766235,0.4687192],"study_design_scores_gemma":[0.00003721488,0.00085872697,0.81565654,0.00087424455,0.00029695127,0.0013125992,0.03751631,0.0020867854,0.019468948,0.0035814568,0.11818135,0.00012892993],"about_ca_topic_score_codex":0.01353602,"about_ca_topic_score_gemma":0.027232371,"teacher_disagreement_score":0.022026805,"about_ca_system_score_codex":0.0011034996,"about_ca_system_score_gemma":0.001544671,"threshold_uncertainty_score":0.07368702},"labels":[],"label_agreement":null},{"id":"W4389139625","doi":"10.37676/professional.v10i1.3745","title":"The An Analysis Of Policy Planning For The Construction Of A Thousand Smooth Roads In Seluma Regency In 2021","year":2023,"lang":"en","type":"article","venue":"Profesional Jurnal Komunikasi dan Administrasi Publik","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.022503336403935863,"score_gpt":0.2991311725318894,"score_spread":0.27662783612795355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389139625","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96536213,0.00068310054,0.0037160085,0.0033681288,0.000061033435,0.0002275056,0.005956638,0.000056611345,0.020568965],"genre_scores_gemma":[0.98607117,0.00051969005,0.0016413826,0.0001337544,0.000018709707,0.00015035155,0.0016656874,0.000016292257,0.009782895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99885535,0.00040455488,0.0000413377,0.00008281906,0.00017790121,0.00043806434],"domain_scores_gemma":[0.9987185,0.00058261334,0.00018033817,0.00003859799,0.00030853358,0.00017151007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016858742,0.00039132318,0.00054741383,0.0016298472,0.0009710949,0.0025775272,0.00079701433,0.0011755117,0.008553886],"category_scores_gemma":[0.00369734,0.00044704517,0.00091657345,0.00226866,0.00049362617,0.0011843324,0.0010163645,0.0013199741,0.00046087295],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009488846,0.00068809546,0.20105422,0.0005049261,0.0006426845,0.0019582694,0.0016339539,0.62826735,0.0010339787,0.100422055,0.015448056,0.047397528],"study_design_scores_gemma":[0.00014825785,0.0010912146,0.3935327,0.00047601582,0.0008717362,0.00023443697,0.029247738,0.4833611,0.0031085336,0.03050821,0.057267535,0.000152477],"about_ca_topic_score_codex":0.26018357,"about_ca_topic_score_gemma":0.36503118,"teacher_disagreement_score":0.26018357,"about_ca_system_score_codex":0.01127675,"about_ca_system_score_gemma":0.012022973,"threshold_uncertainty_score":0.5173383},"labels":[],"label_agreement":null},{"id":"W4389290354","doi":"10.14710/jpk.11.1.82-91","title":"FAKTOR EKSTERNAL DAN INTERNAL PERILAKU KESELAMATAN BERKENDARA PEKERJA KANTORAN PENGGUNA SEPEDA MOTOR (Wilayah Studi: Kota Tangerang Selatan)","year":2023,"lang":"id","type":"article","venue":"Jurnal Pengembangan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Political science; Art","score_opus":0.016241602701095818,"score_gpt":0.23731232221980783,"score_spread":0.22107071951871202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389290354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9581827,0.0038615053,0.0013640025,0.0012552532,0.00007945407,0.00012594614,0.00045955533,0.000016647144,0.034654804],"genre_scores_gemma":[0.9868296,0.0026734574,0.0011498709,0.00025514714,0.000015924355,0.000108436485,0.00025531847,0.0000087951785,0.008703488],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991235,0.0002890808,0.00008160332,0.00015020404,0.00023647613,0.00011924755],"domain_scores_gemma":[0.9963272,0.0020251432,0.00080226996,0.00019797403,0.00039054122,0.0002568673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018743986,0.00032666553,0.00042620322,0.00075681496,0.000977207,0.0027052448,0.00047587446,0.00053415366,0.01290871],"category_scores_gemma":[0.0050429706,0.00033749887,0.00067333266,0.0008491125,0.0009246635,0.0017669619,0.0010750542,0.0011094931,0.001061227],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043248438,0.00079019426,0.81272584,0.0023639805,0.0006421,0.0012126976,0.039637752,0.0004710952,0.0014886137,0.015402297,0.0053410674,0.119492],"study_design_scores_gemma":[0.00006990378,0.00036583885,0.9407149,0.0011785964,0.0006508908,0.0007473753,0.028835531,0.0006112632,0.0014074977,0.0042152167,0.021148983,0.000054005093],"about_ca_topic_score_codex":0.0066619385,"about_ca_topic_score_gemma":0.013386985,"teacher_disagreement_score":0.01290871,"about_ca_system_score_codex":0.0011693944,"about_ca_system_score_gemma":0.002082393,"threshold_uncertainty_score":0.043183923},"labels":[],"label_agreement":null},{"id":"W4389443641","doi":"10.24014/jti.v9i1.21466","title":"Analisis Pemilihan Rute Angkutan Peti Kemas 20ft Dry Port Gedebage Ke Pelabuhan Patimban","year":2023,"lang":"id","type":"article","venue":"Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Forestry; Humanities; Geography; Art","score_opus":0.027612667286146603,"score_gpt":0.24129063716079027,"score_spread":0.21367796987464366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389443641","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.926921,0.003070508,0.0026293558,0.001015188,0.00012035775,0.00037789613,0.007383024,0.00013096984,0.058351696],"genre_scores_gemma":[0.90039325,0.003482418,0.0059237583,0.00061744195,0.000030748102,0.00036286254,0.0050834403,0.000110678535,0.08399537],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989525,0.00013175109,0.000058086058,0.00015112224,0.0005071869,0.00019930431],"domain_scores_gemma":[0.9990357,0.00018434331,0.00015791977,0.000056623263,0.0004977953,0.00006761166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007604068,0.0005600469,0.0004673385,0.0023636196,0.0015854277,0.0026239655,0.0006104995,0.00077602704,0.016824221],"category_scores_gemma":[0.0014027035,0.00031698344,0.00061236724,0.0032015946,0.00072238635,0.0010565168,0.0010705201,0.0009920534,0.002955648],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013034634,0.0007493417,0.5782554,0.0039738966,0.00028107042,0.0070271892,0.027779141,0.0009952094,0.07436773,0.0047419323,0.019118993,0.28140667],"study_design_scores_gemma":[0.000013416364,0.0005389094,0.75156826,0.0007262598,0.0001546216,0.0018230478,0.05434703,0.0006236018,0.015882853,0.0009761684,0.1732583,0.00008746048],"about_ca_topic_score_codex":0.047265355,"about_ca_topic_score_gemma":0.11429376,"teacher_disagreement_score":0.047265355,"about_ca_system_score_codex":0.0013387384,"about_ca_system_score_gemma":0.001792597,"threshold_uncertainty_score":0.09398049},"labels":[],"label_agreement":null},{"id":"W4389487320","doi":"10.18535/ijsrm/v11i12.lla02","title":"Characteristics, Roles and Challenges of Traffic Personnel: Implications toward Efficient Traffic Management System","year":2023,"lang":"en","type":"article","venue":"International Journal of Scientific Research and Management (IJSRM)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); IBM; Psychology; Nonprobability sampling; Traffic police; Thematic analysis; Qualitative property; Operations management; Applied psychology; Medical education; Business; Qualitative research; Engineering; Sociology; Medicine; Statistics; Geography; Demography; Nursing; Social science; Mathematics","score_opus":0.060617341136901315,"score_gpt":0.2920978291000969,"score_spread":0.2314804879631956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389487320","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.991568,0.0003749629,0.00031963328,0.0026491722,0.000056950725,0.000030311821,0.00004170508,0.0000045534844,0.0049546817],"genre_scores_gemma":[0.9974336,0.00049708685,0.00025597613,0.0002220363,0.000019729237,0.000030235877,0.00004134398,0.000002932503,0.0014969894],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.997919,0.00074765657,0.00009666535,0.00012294292,0.00038827254,0.0007253291],"domain_scores_gemma":[0.9974407,0.00039884873,0.0007368232,0.00004013447,0.00048759778,0.00089585176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012991999,0.00023972984,0.00017497309,0.0007495136,0.003573756,0.002237076,0.00059511233,0.0006961531,0.0030875779],"category_scores_gemma":[0.0036181563,0.0002047545,0.00018064391,0.00074626895,0.0011637277,0.0012302985,0.0017608895,0.0009336602,0.000475195],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012758357,0.00038810802,0.74502146,0.0005261139,0.000034364497,0.0036228676,0.17836644,0.00048026352,0.0031773937,0.003367214,0.006391562,0.058496665],"study_design_scores_gemma":[0.0000032625394,0.00017293639,0.31881744,0.00016863606,0.000010057938,0.0008536131,0.66560477,0.00034737767,0.0002010065,0.0006458017,0.013142289,0.000032872515],"about_ca_topic_score_codex":0.012475715,"about_ca_topic_score_gemma":0.020840045,"teacher_disagreement_score":0.012475715,"about_ca_system_score_codex":0.00165448,"about_ca_system_score_gemma":0.0038606727,"threshold_uncertainty_score":0.024806201},"labels":[],"label_agreement":null},{"id":"W4390929856","doi":"10.56521/manajemen-dirgantara.v16i02.1037","title":"PERENCANAAN DAN PERMODELAN KEBUTUHAN PARKIR UNIVERSITAS SEBAGAI PEMBAHARUAN PEDOMAN PERENCANAAN (STUDI KASUS PUSAT PENDIDIKAN/PERGURUAN TINGGI)","year":2023,"lang":"en","type":"article","venue":"Jurnal Manajemen Dirgantara","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Multicollinearity; Transport engineering; Mathematics; Regression analysis; Statistics; Engineering","score_opus":0.012208255387956854,"score_gpt":0.19245742510074576,"score_spread":0.1802491697127889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390929856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6928017,0.044829465,0.004741613,0.0108706495,0.0011856271,0.0003487082,0.0022517752,0.00042187836,0.24254851],"genre_scores_gemma":[0.8340546,0.025033908,0.010331573,0.0005159799,0.000088163964,0.00022481018,0.00097581313,0.0000793088,0.1286959],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978215,0.00004496951,0.0000135875,0.00004564824,0.00006167872,0.000051888983],"domain_scores_gemma":[0.99974483,0.0000714097,0.000026915255,0.000015663143,0.00009374622,0.000047362108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005357961,0.00039799846,0.0002592482,0.0007615533,0.0010422668,0.0020654348,0.00029250066,0.00046995026,0.023030862],"category_scores_gemma":[0.00075995,0.00023200075,0.0001746817,0.00089840783,0.00034693858,0.0013129796,0.00086431124,0.00069461623,0.0043855044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031501078,0.0009545727,0.066254705,0.0028385979,0.000058138747,0.00402762,0.018512111,0.0009348837,0.007809521,0.032544207,0.08081788,0.7849328],"study_design_scores_gemma":[0.000025666748,0.00023345526,0.15580128,0.0011745481,0.00006331551,0.002943841,0.03599958,0.000582633,0.006424359,0.0039138296,0.7927736,0.00006392637],"about_ca_topic_score_codex":0.0063876184,"about_ca_topic_score_gemma":0.012598763,"teacher_disagreement_score":0.023030862,"about_ca_system_score_codex":0.0008996101,"about_ca_system_score_gemma":0.002551404,"threshold_uncertainty_score":0.07704586},"labels":[],"label_agreement":null},{"id":"W4390958031","doi":"10.56521/manajemen-dirgantara.v16i1.839","title":"CLUSTERING SEGMENTASI PASAR PENERBANGAN BANDARA HUSEIN SASTRANEGARA – BANDUNG MENGGUNAKAN INFORMASI PENERBANGAN","year":2023,"lang":"id","type":"article","venue":"Jurnal Manajemen Dirgantara","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Innovation Cluster (Canada)","funders":"","keywords":"Cluster analysis; Humanities; Computer science; Artificial intelligence; Philosophy","score_opus":0.01300493645883991,"score_gpt":0.21592091241198694,"score_spread":0.20291597595314703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390958031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35511044,0.006884634,0.4246003,0.008806144,0.0017756838,0.0018888847,0.04119845,0.008659527,0.15107603],"genre_scores_gemma":[0.58183277,0.0058472715,0.22248448,0.0010455758,0.00037931863,0.0014527593,0.051260017,0.0021610626,0.13353667],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9982303,0.0002475988,0.00013373981,0.0005694248,0.00058778835,0.00023118133],"domain_scores_gemma":[0.9972606,0.00049479253,0.00022866344,0.00037260476,0.0014543794,0.00018901408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014528885,0.0010845755,0.0009710061,0.0030862833,0.0021185544,0.004153446,0.0010856935,0.0012189529,0.012208086],"category_scores_gemma":[0.00399757,0.00064274063,0.0013162675,0.0055766483,0.00074201834,0.0024650581,0.0020529747,0.0016320149,0.009103093],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089530495,0.0003603067,0.09158434,0.002103739,0.00048453416,0.000629623,0.0055031828,0.042283278,0.031225337,0.021790339,0.103822954,0.6993171],"study_design_scores_gemma":[0.00010659957,0.00045166956,0.25060296,0.0010007982,0.0005616178,0.0008838034,0.017623104,0.12241793,0.036493976,0.030356323,0.53897405,0.00052720483],"about_ca_topic_score_codex":0.051772527,"about_ca_topic_score_gemma":0.06923552,"teacher_disagreement_score":0.051772527,"about_ca_system_score_codex":0.002485723,"about_ca_system_score_gemma":0.004123659,"threshold_uncertainty_score":0.10294235},"labels":[],"label_agreement":null},{"id":"W4392354509","doi":"10.25104/transla.v25i2.2299","title":"Analisis Budaya Keselamatan Terhadap Tingkat Pelayanan Jasa Transportasi Penyeberangan Ferry Pelabuhan Bakauheni","year":2024,"lang":"id","type":"article","venue":"Jurnal Penelitian Transportasi Laut","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.010858960701731693,"score_gpt":0.22049271211541643,"score_spread":0.20963375141368473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392354509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94580823,0.005695826,0.001819139,0.0012285245,0.00013089647,0.00014166854,0.0034520945,0.00006650505,0.04165713],"genre_scores_gemma":[0.9606645,0.0034956092,0.0017343428,0.0002966995,0.000032612814,0.00011883863,0.0014835986,0.000055642482,0.032118227],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991522,0.0001629896,0.00007375573,0.00022871036,0.00023551424,0.0001468552],"domain_scores_gemma":[0.9985592,0.0004386785,0.00027640362,0.000078907884,0.0005020934,0.00014474097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008100449,0.00046066032,0.00041991062,0.0011064807,0.0012883849,0.00213263,0.0005274832,0.00052696303,0.01202244],"category_scores_gemma":[0.0021057553,0.0003103888,0.0006472989,0.0017506559,0.00055870356,0.0013393506,0.00091750536,0.0009008397,0.0020536215],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005342361,0.00027349938,0.8338017,0.0017609939,0.00028784084,0.0022298552,0.028288051,0.00033996382,0.0060797087,0.0025581268,0.00822572,0.11562032],"study_design_scores_gemma":[0.000008711075,0.00019641132,0.8839236,0.00053765095,0.00023371179,0.0012666703,0.05398083,0.00046240087,0.0025451472,0.0009465427,0.055860832,0.0000374864],"about_ca_topic_score_codex":0.034492526,"about_ca_topic_score_gemma":0.057555977,"teacher_disagreement_score":0.034492526,"about_ca_system_score_codex":0.0011803742,"about_ca_system_score_gemma":0.0016521023,"threshold_uncertainty_score":0.06858349},"labels":[],"label_agreement":null},{"id":"W4393006439","doi":"10.55123/storage.v3i1.3134","title":"ANALISIS RENCANA PEMBANGUNAN LOKASI RELOKASI DUSUN JATI REJO, KABUPATEN BANTUL","year":2024,"lang":"id","type":"article","venue":"STORAGE Jurnal Ilmiah Teknik dan Ilmu Komputer","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Mathematics","score_opus":0.00927296469977238,"score_gpt":0.2121104985371952,"score_spread":0.20283753383742284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393006439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8158928,0.02606455,0.023780352,0.0025287643,0.00093158317,0.0011817216,0.014277132,0.00097304356,0.11437],"genre_scores_gemma":[0.8071621,0.013442729,0.024883071,0.0020284571,0.00018997643,0.000999571,0.0076602655,0.0007999104,0.14283398],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99669915,0.00047010757,0.00018978165,0.00063548074,0.001614389,0.00039112207],"domain_scores_gemma":[0.9962126,0.0010754848,0.00050907594,0.0002504726,0.0017217217,0.00023064826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00231771,0.0010618157,0.0011148402,0.0026427761,0.0019123245,0.004122024,0.0010189285,0.0012009226,0.022525065],"category_scores_gemma":[0.0032597291,0.00061524694,0.0016221042,0.0022392524,0.0011416603,0.0020386686,0.0016466626,0.0027674602,0.005536892],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00334369,0.0011066356,0.1954826,0.009500565,0.00067084556,0.003469261,0.014591188,0.0017830929,0.488626,0.008259781,0.018183038,0.2549833],"study_design_scores_gemma":[0.00004714785,0.0021474408,0.3248936,0.0016177782,0.0009869098,0.0030933,0.031194035,0.0018448712,0.23434728,0.004763501,0.39469323,0.00037081016],"about_ca_topic_score_codex":0.012922942,"about_ca_topic_score_gemma":0.023171747,"teacher_disagreement_score":0.022525065,"about_ca_system_score_codex":0.0014733158,"about_ca_system_score_gemma":0.0024311256,"threshold_uncertainty_score":0.07535386},"labels":[],"label_agreement":null},{"id":"W4393123799","doi":"10.52186/aviasi.v20i1.130","title":"Penerapan green airport dalam memberikan kepuasan kepada penumpang","year":2023,"lang":"id","type":"article","venue":"Aviasi Jurnal Ilmiah Kedirgantaraan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.01576622450471635,"score_gpt":0.22182211005365482,"score_spread":0.20605588554893847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393123799","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032251433,0.017704332,0.0066848113,0.01694196,0.019557972,0.00035054574,0.0023175972,0.0014685106,0.90272295],"genre_scores_gemma":[0.07597517,0.009987464,0.0042133853,0.0015279559,0.0015802742,0.00011884462,0.0010407766,0.00063242775,0.9049237],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99860376,0.00024096855,0.00006726568,0.00020971682,0.00066038076,0.00021801068],"domain_scores_gemma":[0.99714524,0.0006693577,0.00013320161,0.00041756572,0.00087255874,0.00076191296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018994631,0.0011865445,0.00045680703,0.0022862745,0.0029967872,0.009625776,0.0010115525,0.0012705165,0.16407217],"category_scores_gemma":[0.0028912593,0.00034020352,0.00058134785,0.0027499122,0.0014839711,0.003261747,0.003964335,0.0024435099,0.03204935],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033195838,0.00018295995,0.0032897166,0.0014828643,0.00003679639,0.0011972191,0.008977577,0.00090404035,0.009556677,0.035809334,0.5684303,0.3698005],"study_design_scores_gemma":[0.0000042704823,0.000021990749,0.0017822236,0.00014154769,0.000005732566,0.00012310865,0.001782629,0.0001300774,0.00057738647,0.0007651616,0.99465394,0.000011940733],"about_ca_topic_score_codex":0.0078633595,"about_ca_topic_score_gemma":0.018319122,"teacher_disagreement_score":0.16407217,"about_ca_system_score_codex":0.0027481318,"about_ca_system_score_gemma":0.0044407607,"threshold_uncertainty_score":0.54887605},"labels":[],"label_agreement":null},{"id":"W4393345342","doi":"10.32315/jlbi.v13i1.258","title":"Pengaruh Karakteristik Jalur Pedestrian di Indonesia terhadap Penilaian Walkability","year":2024,"lang":"id","type":"article","venue":"Jurnal Lingkungan Binaan Indonesia","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Walkability; Pedestrian; Geography; Medicine; Physical medicine and rehabilitation; Physical activity","score_opus":0.01237031169409328,"score_gpt":0.2265304326832358,"score_spread":0.21416012098914253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393345342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79013985,0.008367558,0.011739503,0.00809037,0.0008452047,0.0003003768,0.003963768,0.0006029004,0.17595051],"genre_scores_gemma":[0.94266534,0.004228059,0.004957416,0.0006932945,0.00014829496,0.0001859546,0.0012929948,0.00011183392,0.045716844],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991381,0.00018419507,0.00006382273,0.00016788884,0.0002548776,0.00019108775],"domain_scores_gemma":[0.9988129,0.00016323786,0.0002055028,0.000090253874,0.00045154023,0.00027655376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006916002,0.0009231028,0.0006416439,0.0010281433,0.001975887,0.0025742708,0.0005766892,0.0008287679,0.02187088],"category_scores_gemma":[0.0017223107,0.0003777236,0.00077560416,0.000861171,0.000795802,0.0012071839,0.0017438991,0.0013402088,0.0043315454],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016101602,0.001366842,0.47962716,0.0028678982,0.00044476797,0.007301589,0.019137735,0.0013384466,0.02271991,0.008265385,0.047665007,0.40765518],"study_design_scores_gemma":[0.000049053942,0.0006616526,0.830373,0.0007871531,0.00036423755,0.00612062,0.023378534,0.0014180538,0.00656775,0.004670344,0.125413,0.00019664288],"about_ca_topic_score_codex":0.013500728,"about_ca_topic_score_gemma":0.021327764,"teacher_disagreement_score":0.02187088,"about_ca_system_score_codex":0.0010996399,"about_ca_system_score_gemma":0.0017270434,"threshold_uncertainty_score":0.07316536},"labels":[],"label_agreement":null},{"id":"W4399126198","doi":"10.18280/ijsdp.190517","title":"The Effect of Institutional Pressure on Circular Economy Performance in Courier Express Parcel in Indonesia","year":2024,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Circular economy; Business; Industrial organization; Economic geography; Economy; Economic system; Natural resource economics; Economics; Ecology","score_opus":0.004639730560396196,"score_gpt":0.2006903909601673,"score_spread":0.1960506603997711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399126198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99773574,0.000029725512,0.000057516085,0.00009840579,0.000002093114,0.000007037424,0.000016319676,0.0000032507544,0.002049769],"genre_scores_gemma":[0.9996605,0.000030916923,0.00003885076,0.00001108263,0.0000013697487,0.000003248693,0.000013883945,0.000001027704,0.00023912343],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981596,0.0005259747,0.00014930229,0.00018206295,0.00043145678,0.00055160647],"domain_scores_gemma":[0.99207723,0.0016591134,0.0033402406,0.00029031487,0.000768366,0.0018647572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015905965,0.0002720415,0.00020459312,0.00067283993,0.0012141435,0.003023363,0.00042754196,0.00035271593,0.0041223294],"category_scores_gemma":[0.0044957497,0.00015917062,0.00022532417,0.0009918304,0.0016765712,0.0012861608,0.0022507592,0.00060079404,0.00031826764],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015625806,0.0007906089,0.96015126,0.00010755643,0.00006988106,0.001381025,0.008168081,0.0009967182,0.0014827995,0.0013608647,0.00075343036,0.02458139],"study_design_scores_gemma":[0.0000044969806,0.00018306066,0.97300905,0.000037819813,0.000015946162,0.0000779097,0.024035383,0.00077244634,0.00052016956,0.0001867419,0.001139598,0.000017382197],"about_ca_topic_score_codex":0.007136759,"about_ca_topic_score_gemma":0.01228483,"teacher_disagreement_score":0.007136759,"about_ca_system_score_codex":0.0021694906,"about_ca_system_score_gemma":0.0024509754,"threshold_uncertainty_score":0.015740812},"labels":[],"label_agreement":null},{"id":"W4399236242","doi":"10.30598/isometri.2024.3.1.8-17","title":"ANALISIS PENGARUH PELABUHAN UMEPUTIH TERHADAP SOSIAL EKONOMI MASYARAKAT DI PULAU SAPARUA","year":2024,"lang":"id","type":"article","venue":"Jurnal ISOMETRI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.01327418160585608,"score_gpt":0.22707324491151187,"score_spread":0.2137990633056558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399236242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9027947,0.0033408166,0.007828669,0.00238736,0.00020488659,0.0003780258,0.005880207,0.00016283795,0.07702251],"genre_scores_gemma":[0.93005615,0.0024561323,0.0076871575,0.00046024125,0.00005424513,0.0003548586,0.0023299954,0.00007861355,0.0565226],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99833894,0.0003808137,0.00010537652,0.00037958095,0.0005379414,0.0002573712],"domain_scores_gemma":[0.9962735,0.0017749198,0.0003864773,0.0001990318,0.0011084899,0.00025767853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001812281,0.00051036855,0.0005839376,0.002062142,0.0018008215,0.0031994085,0.00066820515,0.0006239631,0.016612142],"category_scores_gemma":[0.0044862675,0.00030869426,0.00074287166,0.0037943458,0.00089345966,0.0015664815,0.00167121,0.0010992148,0.0020502468],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045302132,0.00028678437,0.6915619,0.0018423831,0.00039462798,0.0014879929,0.041688878,0.001306475,0.008020887,0.009440088,0.010552075,0.23296492],"study_design_scores_gemma":[0.000010651066,0.00023995238,0.83769315,0.0005046099,0.00022355744,0.0004182661,0.06276606,0.0010723482,0.0054125516,0.0025082603,0.08908631,0.00006432445],"about_ca_topic_score_codex":0.045545496,"about_ca_topic_score_gemma":0.09101602,"teacher_disagreement_score":0.045545496,"about_ca_system_score_codex":0.0024137648,"about_ca_system_score_gemma":0.0043093264,"threshold_uncertainty_score":0.090560794},"labels":[],"label_agreement":null},{"id":"W4400002860","doi":"10.47134/stti.v1i1.2411","title":"Daya Serap Ruang Terbuka Hijau Perkotaan terhadap Emisi Sektor Transportasi.","year":2024,"lang":"id","type":"article","venue":"Sistem dan Teknik Transportasi Indonesia","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.009663214478244324,"score_gpt":0.20848804594311973,"score_spread":0.1988248314648754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400002860","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4394123,0.00870326,0.01770112,0.0066077183,0.0012344613,0.00039077832,0.012625023,0.0014923115,0.5118331],"genre_scores_gemma":[0.6091293,0.0061533772,0.013078019,0.0010992956,0.00016054937,0.00026944946,0.007163667,0.000576057,0.3623702],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993273,0.00007974521,0.000030157516,0.0001476659,0.00023037156,0.00018478105],"domain_scores_gemma":[0.9990877,0.00013273656,0.000113213064,0.00008199058,0.0004731042,0.00011130458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065433607,0.0006192795,0.0005493171,0.0009770283,0.001960186,0.0035467108,0.0006684067,0.0011564333,0.03804408],"category_scores_gemma":[0.0011713225,0.00039296673,0.00061209034,0.0018601189,0.00053956243,0.0016291443,0.0021244101,0.0013881241,0.009414577],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015760574,0.0006319648,0.19208366,0.0037596058,0.0004764438,0.0030202337,0.01222242,0.0051819705,0.07574255,0.038729582,0.10481186,0.56176376],"study_design_scores_gemma":[0.00003135365,0.00022212816,0.21632153,0.0003886729,0.00015806638,0.0006652495,0.008581975,0.0010859532,0.014200115,0.0029512348,0.7553079,0.000085863336],"about_ca_topic_score_codex":0.048136987,"about_ca_topic_score_gemma":0.09741553,"teacher_disagreement_score":0.048136987,"about_ca_system_score_codex":0.0031836545,"about_ca_system_score_gemma":0.0041476437,"threshold_uncertainty_score":0.1272701},"labels":[],"label_agreement":null},{"id":"W4400336227","doi":"10.47668/edusaintek.v11i3.1207","title":"DAMPAK PEMBANGUNAN JALAN TOL TRANS JAWA TERHADAP PELUANG KEWIRAUSAHAAN","year":2024,"lang":"en","type":"article","venue":"EDUSAINTEK JURNAL PENDIDIKAN SAINS DAN TEKNOLOGI","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Toll; Java; Toll road; Government (linguistics); Business; Transport engineering; Transport infrastructure; Economic growth; Economics; Engineering; Computer science","score_opus":0.012776581131089251,"score_gpt":0.22405840716046388,"score_spread":0.21128182602937462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400336227","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33145165,0.028035764,0.016173597,0.019818451,0.0064321184,0.00043052784,0.0028089436,0.0011967401,0.5936522],"genre_scores_gemma":[0.5159391,0.022238882,0.021620452,0.002928105,0.00041513343,0.00029212408,0.0022172492,0.000505133,0.43384382],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996939,0.000039908904,0.000023332132,0.00006696153,0.00008444494,0.0000914406],"domain_scores_gemma":[0.9996644,0.00006956103,0.00004055745,0.000024738187,0.00012513393,0.000075693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006178478,0.0007485439,0.00048808623,0.0005107611,0.0021836741,0.0028063501,0.0005827031,0.00097087334,0.046057224],"category_scores_gemma":[0.00068457244,0.00034857885,0.00038974095,0.0009214226,0.0006238525,0.0021705208,0.0015320232,0.0018991412,0.008711067],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012485078,0.00085258,0.019848077,0.003623211,0.00010818148,0.0063125137,0.008160645,0.0014223875,0.03127807,0.05266801,0.085585415,0.78889245],"study_design_scores_gemma":[0.000054184376,0.0002248175,0.025654558,0.00056555454,0.0000799412,0.0021721893,0.0075258096,0.00082246587,0.0069929534,0.0038322953,0.95200366,0.00007159435],"about_ca_topic_score_codex":0.0060319663,"about_ca_topic_score_gemma":0.012525768,"teacher_disagreement_score":0.046057224,"about_ca_system_score_codex":0.001317319,"about_ca_system_score_gemma":0.0042372956,"threshold_uncertainty_score":0.15407676},"labels":[],"label_agreement":null},{"id":"W4400734656","doi":"10.35166/jipm.v3i1.27","title":"Road Safety for Persons with Disabilities in Palembang","year":2020,"lang":"en","type":"article","venue":"Journal of Infrastructure Policy and Management","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Optech (Canada)","funders":"","keywords":"Transport engineering; Business; Psychology; Engineering","score_opus":0.007574256862654073,"score_gpt":0.20848108340160673,"score_spread":0.20090682653895267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400734656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960997,0.00035350176,0.000051110717,0.00048907567,0.0000040811806,0.000018244205,0.000049449845,0.000001458641,0.0029333713],"genre_scores_gemma":[0.9989042,0.0005863614,0.00006420657,0.000044509557,0.0000021083706,0.000018950795,0.000027479004,2.9378143e-7,0.00035178527],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995474,0.00017521816,0.00002087727,0.000023138826,0.000054911725,0.0001784479],"domain_scores_gemma":[0.9996599,0.00008485199,0.00011949786,0.000011764168,0.000046446392,0.00007752151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037464738,0.00020217376,0.0001211569,0.0010427008,0.0019029967,0.00091577653,0.0003493996,0.0004839607,0.0031845113],"category_scores_gemma":[0.0012953195,0.00013023507,0.00025964176,0.000941633,0.0007739906,0.00068057544,0.001550624,0.0004957781,0.00017297352],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012002386,0.00074449996,0.8313891,0.0006477745,0.00004366263,0.0057263025,0.05858831,0.00075608277,0.0012928466,0.004327544,0.0018215288,0.09454241],"study_design_scores_gemma":[0.000011937762,0.00040418238,0.80090237,0.0006156524,0.000037235823,0.0012074391,0.18954436,0.000545409,0.000343375,0.000654418,0.0057147387,0.000018848757],"about_ca_topic_score_codex":0.0486522,"about_ca_topic_score_gemma":0.080338605,"teacher_disagreement_score":0.0486522,"about_ca_system_score_codex":0.0018564014,"about_ca_system_score_gemma":0.002234927,"threshold_uncertainty_score":0.09673804},"labels":[],"label_agreement":null},{"id":"W4401090966","doi":"10.58860/jti.v3i7.441","title":"Analisis Kinerja dan Tingkat Pelayanan Ruas Jalan Raya Ciomas Kreteg Kabupaten Bogor","year":2024,"lang":"en","type":"article","venue":"Jurnal Teknik Indonesia","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transport engineering; Traffic flow (computer networking); Data collection; Population; Mathematics; Statistics; Operations management; Geography; Business; Engineering; Computer science; Computer network","score_opus":0.008122164820968015,"score_gpt":0.20569439648818705,"score_spread":0.19757223166721904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401090966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9365024,0.0019235488,0.004734191,0.00035969986,0.00009935851,0.00016443573,0.0032082284,0.00022624429,0.052781936],"genre_scores_gemma":[0.9665131,0.0016487133,0.009059197,0.000058015692,0.000018331215,0.00015863763,0.0023224286,0.000070817274,0.020150661],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993624,0.00009990096,0.00005134674,0.0000998861,0.00030378348,0.00008266582],"domain_scores_gemma":[0.99943274,0.00012114836,0.00008937538,0.000029447137,0.0002742228,0.000053028005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076286076,0.00052995206,0.00051661365,0.0029140564,0.0007591611,0.0019103077,0.00044162388,0.00034487472,0.007631275],"category_scores_gemma":[0.0010955413,0.00025035284,0.00038796864,0.0027533902,0.0004706308,0.00073677354,0.00066228857,0.00052477437,0.0024223858],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056694733,0.0004403395,0.5006105,0.0019687954,0.00025921574,0.002679366,0.022841638,0.00316648,0.023526272,0.007037589,0.019193342,0.41770953],"study_design_scores_gemma":[0.00000733108,0.00014055673,0.8844706,0.00048116286,0.000100334466,0.0010131818,0.04640482,0.00304401,0.0057481127,0.0008859558,0.057637393,0.00006659951],"about_ca_topic_score_codex":0.013029986,"about_ca_topic_score_gemma":0.026655786,"teacher_disagreement_score":0.013029986,"about_ca_system_score_codex":0.0006968357,"about_ca_system_score_gemma":0.0010799664,"threshold_uncertainty_score":0.025908291},"labels":[],"label_agreement":null},{"id":"W4401345567","doi":"10.12962/j2716179x.v19i0.21067","title":"Identifikasi Pola Mobilitas pada Kampus Institut Teknologi Sepuluh Nopember","year":2024,"lang":"ms","type":"article","venue":"Jurnal Penataan Ruang","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.01142078287962076,"score_gpt":0.23219461649909964,"score_spread":0.2207738336194789,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401345567","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58089036,0.02019208,0.023596887,0.025880365,0.000718728,0.0005745444,0.0070658247,0.0003509443,0.34073028],"genre_scores_gemma":[0.8202276,0.012784012,0.015367492,0.001480497,0.000110457906,0.00030065,0.0029149184,0.00010406648,0.14671028],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99876213,0.0003471418,0.000057021713,0.0002021761,0.00033381305,0.0002976763],"domain_scores_gemma":[0.9975352,0.00076212303,0.0004147491,0.00019510904,0.0007953259,0.00029748023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014535388,0.0004534545,0.00026410562,0.0020155965,0.0019433942,0.003863681,0.00045610912,0.00076893746,0.015563829],"category_scores_gemma":[0.0045756013,0.00031702936,0.00016231474,0.003179747,0.00074427546,0.0016544304,0.0022642692,0.00115539,0.0022746497],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026586512,0.00012165642,0.30452776,0.0015597697,0.0001199833,0.003436278,0.03091616,0.0016179838,0.007848851,0.075248525,0.062444944,0.5118922],"study_design_scores_gemma":[0.000010992575,0.000077988996,0.2863974,0.0013973287,0.00006708866,0.0014594141,0.032125406,0.0011341438,0.0043833395,0.004922701,0.66796285,0.000061302075],"about_ca_topic_score_codex":0.039147172,"about_ca_topic_score_gemma":0.06374659,"teacher_disagreement_score":0.039147172,"about_ca_system_score_codex":0.002784176,"about_ca_system_score_gemma":0.006883057,"threshold_uncertainty_score":0.0778386},"labels":[],"label_agreement":null},{"id":"W4402017082","doi":"10.31849/siklus.v9i1.12489","title":"Evaluasi Kinerja Pelayanan dan Tarif Sistem Angkutan Umum Berbasis Bus di Kota Semarang (Studi Kasus : Bus Trans Semarang Koridor I Rute Terminal Penggaron – Terminal Mangkang)","year":2023,"lang":"en","type":"article","venue":"SIKLUS Jurnal Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Terminal (telecommunication); Computer science; Computer network","score_opus":0.014118430899623216,"score_gpt":0.2271776339031811,"score_spread":0.21305920300355788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402017082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9832982,0.0005457916,0.0007402964,0.00008991432,0.000017985367,0.00006863885,0.0001749583,0.000018780338,0.015045593],"genre_scores_gemma":[0.98950094,0.00079942803,0.0019622978,0.000022730641,0.000008179855,0.00009155122,0.00045311957,0.000011031096,0.007150769],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994411,0.0001928995,0.00004070049,0.000090835034,0.0001602564,0.00007417587],"domain_scores_gemma":[0.99937373,0.00021577143,0.000061803636,0.000027277274,0.00024891907,0.00007248207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012630863,0.00037278642,0.00031557016,0.0006036254,0.0007066032,0.0015596909,0.00017696488,0.00025133218,0.0056544896],"category_scores_gemma":[0.0013585563,0.00014615786,0.00025372856,0.000946199,0.00035117115,0.00092159427,0.0005079393,0.00042217973,0.0012197752],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010046096,0.0025253955,0.47909382,0.0011588768,0.00016787878,0.00094981014,0.047438864,0.0028886506,0.011547112,0.004603366,0.008190663,0.440431],"study_design_scores_gemma":[0.00003501272,0.002610924,0.86933714,0.0002885452,0.00020857611,0.00051012484,0.07339744,0.0030243706,0.008103217,0.0014082682,0.04099815,0.00007822902],"about_ca_topic_score_codex":0.003941833,"about_ca_topic_score_gemma":0.007929726,"teacher_disagreement_score":0.0056544896,"about_ca_system_score_codex":0.00078032847,"about_ca_system_score_gemma":0.001008123,"threshold_uncertainty_score":0.01891613},"labels":[],"label_agreement":null},{"id":"W4402216485","doi":"10.36985/rrt7n489","title":"Pengaruh Peningkatan Infrastruktur Jalan Terhadap Pendapatan Regional Di Kabupaten Batu Bara","year":2021,"lang":"id","type":"article","venue":"Jurnal Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.030407031297601743,"score_gpt":0.2418312254843354,"score_spread":0.21142419418673364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402216485","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71980286,0.009491376,0.027475027,0.0039060854,0.0006176309,0.0009070913,0.006879488,0.00078343664,0.23013693],"genre_scores_gemma":[0.88890547,0.0046345457,0.018982466,0.0005421959,0.00010398304,0.00056856766,0.002535408,0.00023442373,0.08349303],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.997764,0.00044131346,0.00015781986,0.00045296922,0.00080465793,0.0003792428],"domain_scores_gemma":[0.9962004,0.0008885731,0.0007267673,0.00036531364,0.0013067191,0.00051223126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019386598,0.00085934636,0.0006473542,0.0018817282,0.0021629764,0.0041681877,0.0010247432,0.0006450929,0.027289094],"category_scores_gemma":[0.0032192175,0.00051532243,0.00065960234,0.0031822794,0.0013996683,0.0018151107,0.002244341,0.001279764,0.0044206358],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001236593,0.0006921179,0.3298617,0.004907107,0.000558251,0.0027290098,0.027494265,0.002634117,0.055849466,0.022696845,0.025072798,0.5262678],"study_design_scores_gemma":[0.000043573746,0.00085700065,0.6291566,0.0011147131,0.000378624,0.0013785154,0.04740049,0.0009465171,0.01976144,0.0066327467,0.2921537,0.0001761443],"about_ca_topic_score_codex":0.020760419,"about_ca_topic_score_gemma":0.04849981,"teacher_disagreement_score":0.027289094,"about_ca_system_score_codex":0.002198848,"about_ca_system_score_gemma":0.0050290865,"threshold_uncertainty_score":0.09129113},"labels":[],"label_agreement":null},{"id":"W4402627778","doi":"10.33087/talentasipil.v7i2.641","title":"Faktor yang Mempengaruhi Rendahnya Kualitas Pekerjaan Konstruksi Jalan di Pasaman Regency","year":2024,"lang":"en","type":"article","venue":"Jurnal Talenta Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Advertising; Business","score_opus":0.009480209936990846,"score_gpt":0.214309677285943,"score_spread":0.20482946734895216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402627778","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69272834,0.022468831,0.009092083,0.0094208205,0.002718087,0.0003653371,0.0018191857,0.0011340386,0.26025325],"genre_scores_gemma":[0.82245797,0.013746747,0.010206747,0.00088617764,0.00039917813,0.0003640973,0.0015070408,0.00020176783,0.15023035],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955255,0.00009773507,0.00003351055,0.000076748416,0.00014937225,0.00009008218],"domain_scores_gemma":[0.99949074,0.00011115766,0.00007474467,0.00004591099,0.00018223796,0.00009522101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010251845,0.0008861438,0.00045421047,0.00085553946,0.002546793,0.0025102561,0.00058921945,0.00067307666,0.03051821],"category_scores_gemma":[0.0010884632,0.00030693787,0.00037266148,0.0011058341,0.00074846967,0.0011181228,0.001518091,0.0012976126,0.00652854],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009706344,0.00073558785,0.07083361,0.003572989,0.00016074035,0.010950056,0.015262999,0.0023062208,0.02266721,0.045521777,0.07815019,0.74886787],"study_design_scores_gemma":[0.00008082469,0.00040687452,0.094666466,0.0010156679,0.00013266447,0.006764288,0.016337328,0.0014745313,0.009945136,0.0047546322,0.86429155,0.000130133],"about_ca_topic_score_codex":0.0028821607,"about_ca_topic_score_gemma":0.0055473675,"teacher_disagreement_score":0.03051821,"about_ca_system_score_codex":0.0011902744,"about_ca_system_score_gemma":0.0032200634,"threshold_uncertainty_score":0.10209358},"labels":[],"label_agreement":null},{"id":"W4403238031","doi":"10.29313/jrpwk.v4i1.3593","title":"Kajian Elemen Pembentuk Citra Path Koridor Jelekong Kabupaten Bandung","year":2024,"lang":"en","type":"article","venue":"Jurnal Riset Perencanaan Wilayah dan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Path (computing); Computer science; Computer network","score_opus":0.007826722731940041,"score_gpt":0.20213165568587982,"score_spread":0.19430493295393977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403238031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64691603,0.0038108644,0.004546104,0.0030544128,0.00078627013,0.00016773051,0.0004766055,0.00014703131,0.34009495],"genre_scores_gemma":[0.86507964,0.0029186995,0.00441273,0.00027785136,0.00003567415,0.00011286767,0.00026509957,0.00005011492,0.12684724],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99990237,0.000018037752,0.0000049671794,0.000017996805,0.00002176563,0.000034812772],"domain_scores_gemma":[0.9998913,0.000024123356,0.000016354215,0.0000085043675,0.000029706778,0.000030099234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018984138,0.00028497647,0.00012294287,0.00037238697,0.0019111772,0.0012280535,0.0002472812,0.00029678302,0.025411785],"category_scores_gemma":[0.00031872193,0.000118271215,0.000140136,0.0007950008,0.00060049316,0.001109686,0.00088230195,0.00058320427,0.0021700913],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008041317,0.00041325032,0.060578644,0.0022282961,0.00004720878,0.010100611,0.12384685,0.0008744965,0.029036205,0.07872255,0.046792667,0.64655507],"study_design_scores_gemma":[0.000021295044,0.00016137464,0.083455354,0.0006614366,0.000048424627,0.002534732,0.13407095,0.0004114994,0.0036573398,0.0027921088,0.7721383,0.000047143538],"about_ca_topic_score_codex":0.0040899785,"about_ca_topic_score_gemma":0.012856029,"teacher_disagreement_score":0.025411785,"about_ca_system_score_codex":0.00071529247,"about_ca_system_score_gemma":0.0013096898,"threshold_uncertainty_score":0.085010886},"labels":[],"label_agreement":null},{"id":"W4403239201","doi":"10.29313/bcsurp.v4i3.14140","title":"Identifikasi Gap antara Kapasitas Parkir dan Kebutuhan Parkir di Kampus Satu Universitas Islam Bandung dengan Metode Supply and Demand","year":2024,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.020413741727074185,"score_gpt":0.21573780746700677,"score_spread":0.19532406573993258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403239201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97626185,0.00047976448,0.0060855066,0.00029861185,0.000032837987,0.000073982206,0.000924533,0.000070869,0.015772106],"genre_scores_gemma":[0.9945707,0.0002025183,0.0026149184,0.0000196788,0.000007871042,0.000046239296,0.000517208,0.0000111516,0.0020097094],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99931276,0.00010622603,0.00005925148,0.00011881773,0.00027717944,0.00012574618],"domain_scores_gemma":[0.9989191,0.00042744202,0.00016953076,0.00004630635,0.00036568672,0.000071884344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005880477,0.00046198443,0.00046896265,0.0024752966,0.0006081026,0.0021944428,0.000469522,0.0004803311,0.010112755],"category_scores_gemma":[0.0013442143,0.0002615038,0.00034430085,0.002703069,0.0003305215,0.0019643996,0.0008868027,0.0004443753,0.00119997],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009027165,0.0006828165,0.6403525,0.0012775661,0.00017914017,0.0029360333,0.0051723025,0.015897993,0.011311513,0.017595096,0.009318952,0.2943734],"study_design_scores_gemma":[0.000049554346,0.0007949176,0.71941197,0.00046667422,0.00022129096,0.0031930557,0.0673517,0.14558063,0.011631781,0.013385861,0.03773834,0.00017418958],"about_ca_topic_score_codex":0.005408942,"about_ca_topic_score_gemma":0.0062836995,"teacher_disagreement_score":0.010112755,"about_ca_system_score_codex":0.001040485,"about_ca_system_score_gemma":0.0009791165,"threshold_uncertainty_score":0.033830583},"labels":[],"label_agreement":null},{"id":"W4403683788","doi":"10.36456/jpb.v5i1.9630","title":"Kajian Kebutuhan Perlengkapan Jalan Penunjang Sektor Pariwisata Ruas Trowulan-Pacet Kabupaten Mojokerto","year":2024,"lang":"id","type":"article","venue":"Jurnal Plano Buana","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business administration; Business","score_opus":0.012640659422157969,"score_gpt":0.21290199523062595,"score_spread":0.20026133580846797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403683788","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5602999,0.02402615,0.025930729,0.009694375,0.0020183984,0.0009392925,0.0044280607,0.0017915294,0.37087157],"genre_scores_gemma":[0.6628127,0.015449251,0.02401815,0.0015727078,0.0003005203,0.00065528275,0.0026220935,0.00060373056,0.2919656],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991738,0.00013654726,0.000044882527,0.00018987492,0.000252128,0.00020271518],"domain_scores_gemma":[0.99922,0.00012371568,0.00014654979,0.0000911098,0.00026176075,0.00015686837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008205629,0.0008041813,0.0008202482,0.0009853893,0.0021864523,0.004150814,0.0010873983,0.0011741398,0.04077208],"category_scores_gemma":[0.0008737447,0.0006057598,0.0009136386,0.0011191395,0.0010450578,0.0025538842,0.0026400741,0.0020425452,0.0100197885],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031129906,0.0012939654,0.055491965,0.0052506854,0.00051459565,0.004604255,0.009814229,0.0016910636,0.32866406,0.04300567,0.038648404,0.5079081],"study_design_scores_gemma":[0.00010523705,0.0012931244,0.08171025,0.00081828155,0.0003473414,0.0017426449,0.011113421,0.0008987438,0.07363327,0.00574565,0.822398,0.00019399078],"about_ca_topic_score_codex":0.008410221,"about_ca_topic_score_gemma":0.019846778,"teacher_disagreement_score":0.04077208,"about_ca_system_score_codex":0.0019231673,"about_ca_system_score_gemma":0.0038279973,"threshold_uncertainty_score":0.13639617},"labels":[],"label_agreement":null},{"id":"W4403755618","doi":"10.22219/jmts.v22i1.30680","title":"Analisis Kemampuan Membayar dan Kemauan Membayar Pengguna Jasa Angkutan Umum Trayek AL (Arjosari-Landungsari) Kota Malang","year":2024,"lang":"id","type":"article","venue":"Jurnal Media Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Medicine","score_opus":0.013104746055994498,"score_gpt":0.22423248089241002,"score_spread":0.21112773483641553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403755618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9435638,0.010534398,0.0055527417,0.0017049604,0.00029657845,0.0005323486,0.006836049,0.000171681,0.030807303],"genre_scores_gemma":[0.9335089,0.006621721,0.009333169,0.00092400186,0.00007080261,0.0003653876,0.0036296893,0.00007745852,0.04546892],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99848014,0.00031788115,0.00017924009,0.0002489281,0.00050987466,0.00026391327],"domain_scores_gemma":[0.99869055,0.0002818248,0.00033150378,0.00008668848,0.0005024842,0.00010692559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001512998,0.0007602362,0.00058781717,0.0016349208,0.001192881,0.0025382894,0.0006864183,0.0009491235,0.008999885],"category_scores_gemma":[0.0018359533,0.00043330732,0.0008990472,0.001619669,0.0006380253,0.0010553177,0.0010301468,0.0010526347,0.002354832],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001701047,0.0007373542,0.7327949,0.003529678,0.00048147977,0.00427708,0.011719657,0.00072973385,0.0890427,0.0026114476,0.009722471,0.14265244],"study_design_scores_gemma":[0.000046861594,0.0019766751,0.73453677,0.0011293909,0.0007554904,0.0053237295,0.039381854,0.0015206554,0.07190882,0.0020263689,0.14124478,0.00014866164],"about_ca_topic_score_codex":0.015397442,"about_ca_topic_score_gemma":0.032256745,"teacher_disagreement_score":0.015397442,"about_ca_system_score_codex":0.0008673927,"about_ca_system_score_gemma":0.0015443601,"threshold_uncertainty_score":0.030615628},"labels":[],"label_agreement":null},{"id":"W4405383785","doi":"10.12962/j2716179x.v19i2.20721","title":"Kesiapan Aktor Dan Kebijakan Dalam Mewujudkan Smart Mobility Di Provinsi Bali","year":2024,"lang":"id","type":"article","venue":"Jurnal Penataan Ruang","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Materials science","score_opus":0.010865583640022925,"score_gpt":0.21944796699571842,"score_spread":0.20858238335569548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405383785","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34974614,0.014647237,0.015323031,0.01830058,0.0013193247,0.00024316864,0.0041277725,0.0013656854,0.594927],"genre_scores_gemma":[0.77774096,0.006237954,0.0062776036,0.0013420923,0.00016726431,0.00014010887,0.001994497,0.00016795725,0.20593159],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994425,0.00008775303,0.000023449966,0.00011500669,0.00015687996,0.00017435089],"domain_scores_gemma":[0.9995499,0.000055662615,0.000045954974,0.000041794545,0.00020468706,0.00010186013],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000523725,0.0006998335,0.00029439243,0.0010704467,0.0019791704,0.0034948776,0.00061397726,0.0011093541,0.024560997],"category_scores_gemma":[0.00078304094,0.00030641627,0.0003697387,0.0019422272,0.0010898219,0.0017988451,0.0024469283,0.0015804125,0.005065261],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000574324,0.00037542652,0.1316047,0.0017500697,0.00022800518,0.0021814976,0.0131236585,0.00466003,0.029736428,0.14050946,0.080370516,0.5948859],"study_design_scores_gemma":[0.000027554433,0.00011252372,0.12760411,0.00033464498,0.000074631556,0.0005066591,0.009269098,0.0011864031,0.0031968888,0.0053894687,0.85222334,0.00007471117],"about_ca_topic_score_codex":0.049684633,"about_ca_topic_score_gemma":0.06939174,"teacher_disagreement_score":0.049684633,"about_ca_system_score_codex":0.003549654,"about_ca_system_score_gemma":0.004382214,"threshold_uncertainty_score":0.098790884},"labels":[],"label_agreement":null},{"id":"W4405669360","doi":"10.20527/jukung.v10i1.20598","title":"PENGUKURAN TINGKAT KEBISINGAN DI LOKASI RENCANA PEMBANGUNAN FLY OVER KOTA BANDUNG","year":2024,"lang":"id","type":"article","venue":"Jukung (Jurnal Teknik Lingkungan)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.01007212406467013,"score_gpt":0.2287621740338509,"score_spread":0.2186900499691808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405669360","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81284535,0.0015585433,0.012905557,0.00066780107,0.00029503988,0.00035801943,0.006117801,0.0008645132,0.16438735],"genre_scores_gemma":[0.78455263,0.0017539756,0.01495332,0.0003584608,0.000046816414,0.00019360133,0.004095147,0.00052528316,0.19352077],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.999471,0.000025463145,0.000018720793,0.00011450359,0.00024846062,0.00012195785],"domain_scores_gemma":[0.9994287,0.000079572645,0.00005069941,0.000057466066,0.0003077394,0.00007569175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000381351,0.0006731161,0.0006607493,0.0011543048,0.0018021489,0.0021494678,0.00080209546,0.0007684547,0.031886753],"category_scores_gemma":[0.00055372284,0.0003978061,0.0006210056,0.0014790728,0.0004915733,0.0011157119,0.0010697774,0.0013676878,0.0047200783],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024968553,0.0005542903,0.12135516,0.0017068443,0.0002864319,0.0028797465,0.0042299586,0.0047526876,0.4435577,0.003826458,0.017161507,0.39719236],"study_design_scores_gemma":[0.00007120444,0.0010465642,0.46618575,0.000331573,0.00042438006,0.0013039168,0.016376602,0.0032439432,0.19701777,0.0017986065,0.31195226,0.00024742656],"about_ca_topic_score_codex":0.04431829,"about_ca_topic_score_gemma":0.14575106,"teacher_disagreement_score":0.04431829,"about_ca_system_score_codex":0.0016645645,"about_ca_system_score_gemma":0.001999144,"threshold_uncertainty_score":0.10667181},"labels":[],"label_agreement":null},{"id":"W4405930355","doi":"10.33387/clapeyron.v5i2.8508","title":"EVALUASI KINERJA RUAS JALAN AKIBAT PARKIR PINGGIR JALAN DI JALAN VETERAN, DENPASAR UTARA, KOTA DENPASAR, BALI","year":2024,"lang":"id","type":"article","venue":"CLAPEYRON JURNAL ILMIAH TEKNIK SIPIL","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transport engineering; Engineering","score_opus":0.014740838937777452,"score_gpt":0.24053338191952028,"score_spread":0.22579254298174284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405930355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8619189,0.01260301,0.009274191,0.0036116838,0.00075982424,0.005462823,0.006410306,0.00047532876,0.09948394],"genre_scores_gemma":[0.88210374,0.009694214,0.0230804,0.001831343,0.00020341553,0.006568996,0.0035538487,0.00021578783,0.07274828],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9958872,0.0015872979,0.00031766764,0.000459605,0.0012621608,0.00048606735],"domain_scores_gemma":[0.99514633,0.001390645,0.00056959403,0.00021080406,0.0019293537,0.0007532734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054536723,0.0007470253,0.0009103973,0.0012254285,0.0013526485,0.002523747,0.0007993722,0.0008106248,0.024064446],"category_scores_gemma":[0.006877401,0.00035563996,0.0015014831,0.0007801622,0.0006779575,0.001412573,0.0013307007,0.0015405457,0.00535706],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006456496,0.009100109,0.27097833,0.009080969,0.0007769315,0.0010043542,0.020111663,0.00159995,0.021749677,0.004286667,0.036947466,0.61790735],"study_design_scores_gemma":[0.0005468526,0.024376664,0.6175765,0.004707454,0.0018693216,0.001850175,0.055386573,0.0022287115,0.024975888,0.0032313864,0.26286867,0.00038180358],"about_ca_topic_score_codex":0.0047050063,"about_ca_topic_score_gemma":0.014157085,"teacher_disagreement_score":0.024064446,"about_ca_system_score_codex":0.0015553827,"about_ca_system_score_gemma":0.0035576103,"threshold_uncertainty_score":0.08050358},"labels":[],"label_agreement":null},{"id":"W4406133389","doi":"10.46799/arl.v8i2.198","title":"Analisis Transportasi untuk Lokasi Pengisian Bahan Bakar Moda Kendaraan Listrik","year":2024,"lang":"id","type":"article","venue":"Action Research Literate","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Automotive engineering; Computer science; Engineering","score_opus":0.0985979594317751,"score_gpt":0.37445807562236716,"score_spread":0.27586011619059203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406133389","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90293187,0.0024225127,0.006544747,0.001589851,0.00017346599,0.00018389054,0.008091335,0.0002436191,0.07781875],"genre_scores_gemma":[0.9521021,0.0017259892,0.004629191,0.00022254363,0.00003564425,0.00012896824,0.0038711694,0.00009740708,0.037187062],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998779,0.00018602911,0.000101294405,0.00020518817,0.00052465015,0.00020380683],"domain_scores_gemma":[0.9967871,0.0010806783,0.00031961003,0.00018141425,0.0014895508,0.00014161416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012565857,0.00043420104,0.00037695398,0.001955438,0.0015437874,0.0040041516,0.00045826504,0.0005781683,0.014660639],"category_scores_gemma":[0.0037012605,0.00024909072,0.0004828714,0.003631291,0.0007024977,0.0018845118,0.0013860018,0.00091069355,0.002685024],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067580654,0.00015811546,0.6972109,0.0014110758,0.00032613555,0.0014017172,0.043904454,0.0036820665,0.013435772,0.011404987,0.015214708,0.21117422],"study_design_scores_gemma":[0.000013367946,0.00016569092,0.71007377,0.00048686846,0.0002991999,0.00051410345,0.14170797,0.00299112,0.0051796394,0.0030863846,0.13538304,0.00009888047],"about_ca_topic_score_codex":0.11943679,"about_ca_topic_score_gemma":0.17181109,"teacher_disagreement_score":0.11943679,"about_ca_system_score_codex":0.0024244874,"about_ca_system_score_gemma":0.0026470781,"threshold_uncertainty_score":0.2374832},"labels":[],"label_agreement":null},{"id":"W4406300804","doi":"10.58812/wsist.v2i03.1412","title":"Analysis of Policies and Implementation of Railway Crossing Regulations in Indonesia: A Multi-Stakeholder Approach to Enhance Compliance and Safety","year":2024,"lang":"en","type":"article","venue":"West Science Information System and Technology","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Compliance (psychology); Stakeholder; Business; Transport engineering; Risk analysis (engineering); Engineering; Political science; Public relations; Psychology","score_opus":0.022954582135457563,"score_gpt":0.280732909639099,"score_spread":0.2577783275036415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406300804","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98909134,0.00008057797,0.002942937,0.00067115563,0.0000047839058,0.0001593505,0.00012344752,0.000008629496,0.0069178157],"genre_scores_gemma":[0.99639434,0.00010678092,0.0025966247,0.000049009053,0.0000015376437,0.00008374803,0.00006584199,0.0000038246903,0.00069832936],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9934777,0.004316844,0.00040371367,0.00036442155,0.0009874091,0.00044989478],"domain_scores_gemma":[0.9893985,0.0058711357,0.0023642418,0.0003611945,0.0016584235,0.0003465285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007397693,0.00019407876,0.00025423008,0.0012947157,0.0010644961,0.0018572984,0.00046730353,0.00038985483,0.0015448314],"category_scores_gemma":[0.00885671,0.0001808997,0.0003426155,0.001649407,0.0007296476,0.0014182761,0.0010668347,0.00070268556,0.00012219998],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028464748,0.001544319,0.6928898,0.0011940567,0.0002064686,0.0013523604,0.074479915,0.017288929,0.0062772823,0.015219015,0.0015037395,0.18775938],"study_design_scores_gemma":[0.000017025171,0.00044182705,0.81627136,0.0004004758,0.000088910805,0.00018477203,0.139859,0.024253774,0.0049128896,0.0040730685,0.009429532,0.000067288864],"about_ca_topic_score_codex":0.014839042,"about_ca_topic_score_gemma":0.026916387,"teacher_disagreement_score":0.014839042,"about_ca_system_score_codex":0.004929139,"about_ca_system_score_gemma":0.007321073,"threshold_uncertainty_score":0.039123237},"labels":[],"label_agreement":null},{"id":"W4407043368","doi":"10.54082/jamsi.1371","title":"Penyuluhan Penggunaan Jalan untuk Meredam Konflik antar Pengguna di Rukun Warga 04 Kayuringin Jaya, Kota Bekasi, Jawa Barat","year":2024,"lang":"id","type":"article","venue":"Jurnal Abdi Masyarakat Indonesia","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Psychology; Business","score_opus":0.009565932078295106,"score_gpt":0.2144701174384097,"score_spread":0.20490418536011462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407043368","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26187277,0.011068966,0.010799898,0.012845245,0.0022941064,0.00034579655,0.0012599302,0.0011565243,0.69835675],"genre_scores_gemma":[0.4224995,0.0060150675,0.010217637,0.0017905557,0.00031007326,0.00021723201,0.00095019233,0.0004601662,0.5575396],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999116,0.00015130188,0.000036571917,0.00018711317,0.00026935714,0.00023964023],"domain_scores_gemma":[0.99891305,0.0001844049,0.0001324319,0.0001489918,0.00032738975,0.0002938198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095636357,0.00066350726,0.00034215167,0.000791311,0.0029227422,0.003783455,0.0009132761,0.0012913148,0.057071064],"category_scores_gemma":[0.0014659264,0.00042092334,0.0005333595,0.000832334,0.0013559117,0.0023683999,0.0032258541,0.002170655,0.012272205],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011929645,0.00074452354,0.038166046,0.002370937,0.00019054275,0.0041396394,0.026200559,0.0011849401,0.08262863,0.08479782,0.0821464,0.67623705],"study_design_scores_gemma":[0.000023242024,0.0003260036,0.03161185,0.00029668218,0.000056470715,0.00077553064,0.00636578,0.00024480518,0.013107334,0.0028793719,0.94424313,0.000069810005],"about_ca_topic_score_codex":0.0092412075,"about_ca_topic_score_gemma":0.019337175,"teacher_disagreement_score":0.057071064,"about_ca_system_score_codex":0.0017006333,"about_ca_system_score_gemma":0.0043410733,"threshold_uncertainty_score":0.19092172},"labels":[],"label_agreement":null},{"id":"W4407093927","doi":"10.47198/jnaker.v19i3.417","title":"Evaluation of the Implementation of Law No. 1 of 1970 on Occupational Safety: Challenges, Effectiveness, and Policy Recommendations","year":2024,"lang":"en","type":"article","venue":"Jurnal Ketenagakerjaan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Confederation College","funders":"","keywords":"Risk analysis (engineering); Business; Law; Political science","score_opus":0.034296182290680856,"score_gpt":0.3219741576641181,"score_spread":0.2876779753734372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407093927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82822716,0.003493515,0.0037677302,0.021525806,0.0004683063,0.009020128,0.0013117946,0.00010775838,0.13207789],"genre_scores_gemma":[0.98442394,0.0013669396,0.003929676,0.002786219,0.00009643122,0.0030722534,0.000398289,0.000030025889,0.0038962031],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.85577905,0.08416127,0.008333019,0.0037583576,0.03640244,0.011565831],"domain_scores_gemma":[0.71059364,0.20035143,0.029224457,0.005313425,0.04954033,0.0049766544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.16184328,0.0009021011,0.0014142718,0.005162757,0.0031859572,0.010070203,0.0030610177,0.003600146,0.0052766665],"category_scores_gemma":[0.18796405,0.00070001365,0.0015981855,0.0052261436,0.0047407225,0.005800123,0.0035275829,0.004585659,0.0006048065],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0076769283,0.020577628,0.19721287,0.014007116,0.001407769,0.0013103317,0.030900998,0.040569775,0.004025625,0.18437737,0.025637735,0.4722959],"study_design_scores_gemma":[0.0031549437,0.03273411,0.58142775,0.017229848,0.0028589054,0.00030092624,0.16526349,0.033527687,0.016415518,0.030390585,0.1159228,0.0007734431],"about_ca_topic_score_codex":0.051954325,"about_ca_topic_score_gemma":0.027719235,"teacher_disagreement_score":0.16184328,"about_ca_system_score_codex":0.049281437,"about_ca_system_score_gemma":0.064671025,"threshold_uncertainty_score":0.85591936},"labels":[],"label_agreement":null},{"id":"W4407674175","doi":"10.58684/jbs.v3i1.49","title":"Pentingnya Intergrasi Transportasi Publik di Kota Surakarta Sebagai Kota Urbanisasi di Jawa Tengah","year":2024,"lang":"id","type":"article","venue":"Jurnal Bengawan Solo Pusat Kajian Penelitian dan Pengembangan Daerah Kota Surakarta","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Sociology","score_opus":0.012662696264814121,"score_gpt":0.22491192834236753,"score_spread":0.21224923207755342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407674175","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8012598,0.0035999513,0.005560879,0.0032867282,0.00032845614,0.00061687455,0.004025538,0.0002748074,0.18104684],"genre_scores_gemma":[0.8981812,0.0036215652,0.005330486,0.00043989095,0.00006138406,0.00022283106,0.0014184377,0.00009214155,0.09063214],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99898475,0.00015518148,0.000074170144,0.00014007105,0.00044531384,0.00020054435],"domain_scores_gemma":[0.9985875,0.0003774274,0.00023071619,0.0001144779,0.0005128317,0.00017708901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007602199,0.00044107673,0.00039498112,0.001192463,0.0023902138,0.00347731,0.00064927764,0.00064722117,0.030444512],"category_scores_gemma":[0.0019240333,0.00034228447,0.00053230714,0.0022400804,0.0009369311,0.0018487991,0.0025871203,0.0010414524,0.0029874411],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074438984,0.0006903037,0.27799344,0.006425045,0.0003969176,0.0069578514,0.071584895,0.0023090777,0.04064601,0.030729378,0.023952173,0.5375704],"study_design_scores_gemma":[0.000038273087,0.0005712774,0.4761229,0.001111068,0.00035473244,0.0027497846,0.11259121,0.0016099947,0.009408088,0.003496689,0.39178005,0.00016597428],"about_ca_topic_score_codex":0.06756673,"about_ca_topic_score_gemma":0.14293498,"teacher_disagreement_score":0.06756673,"about_ca_system_score_codex":0.0026628533,"about_ca_system_score_gemma":0.005928632,"threshold_uncertainty_score":0.1343469},"labels":[],"label_agreement":null},{"id":"W4407674178","doi":"10.58684/jbs.v3i2.77","title":"Peran Penanaman Modal dalam Pengembangan Infrastruktur Kota Surakarta","year":2024,"lang":"id","type":"article","venue":"Jurnal Bengawan Solo Pusat Kajian Penelitian dan Pengembangan Daerah Kota Surakarta","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Modal; Environmental science; Business; Materials science; Composite material","score_opus":0.011410238404285187,"score_gpt":0.22367733309497922,"score_spread":0.21226709469069405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407674178","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.095289595,0.0027343754,0.017343337,0.008248289,0.0005675005,0.00023508054,0.0007283391,0.0007727953,0.8740808],"genre_scores_gemma":[0.5160106,0.003426147,0.012834052,0.001800007,0.00013955515,0.00021635367,0.0005075577,0.000249716,0.46481594],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999126,0.00015249735,0.000037393722,0.000182669,0.00029236032,0.00020898931],"domain_scores_gemma":[0.9989454,0.00017992112,0.00010811623,0.00014332311,0.00037090442,0.00025226202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009816913,0.00073941506,0.00027913507,0.0009571348,0.0024687967,0.0045164595,0.0009208272,0.0010528509,0.055030625],"category_scores_gemma":[0.0013453722,0.00035214375,0.00047711923,0.00078553904,0.0015243399,0.0027173066,0.0029459288,0.0018314744,0.008998367],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066906115,0.0007094962,0.027952772,0.0016520998,0.00013768607,0.0023866957,0.016636694,0.0026453747,0.029918062,0.25480336,0.07310261,0.58938605],"study_design_scores_gemma":[0.00002866611,0.00037029778,0.029708652,0.0005500797,0.00007817818,0.0009339778,0.013144866,0.0011828799,0.0072913384,0.016137196,0.930488,0.0000857769],"about_ca_topic_score_codex":0.0074034343,"about_ca_topic_score_gemma":0.01640564,"teacher_disagreement_score":0.055030625,"about_ca_system_score_codex":0.002782802,"about_ca_system_score_gemma":0.0040207915,"threshold_uncertainty_score":0.1840958},"labels":[],"label_agreement":null},{"id":"W4408139490","doi":"10.29313/bcsurp.v5i1.18178","title":"Kajian Permasalahan Jalur Pedestrian Di Jalan Husein Kartasasmita Kota Banjar, Jawa Barat","year":2025,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Environmental science","score_opus":0.020231495823285834,"score_gpt":0.22673512882041946,"score_spread":0.20650363299713362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408139490","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93661714,0.0023748172,0.0022718287,0.0029371888,0.00038452522,0.00011161321,0.00045221444,0.00014787941,0.054702874],"genre_scores_gemma":[0.951597,0.0026839036,0.003770286,0.00048175623,0.000051884464,0.00007323696,0.0003250983,0.0000350768,0.040981784],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99968195,0.00006813598,0.000023211609,0.00006095101,0.000079283105,0.000086511944],"domain_scores_gemma":[0.99951637,0.000067210785,0.00012432966,0.000026873815,0.0001697556,0.00009552724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031945048,0.00043912552,0.00023978653,0.0004284788,0.0022440038,0.0011358319,0.00044731735,0.0005906499,0.0149346925],"category_scores_gemma":[0.00044213652,0.0001928835,0.00026134975,0.0006375918,0.0005939224,0.00071062765,0.00095268176,0.0005959663,0.0019304125],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007647818,0.0009362219,0.36275697,0.0039303503,0.00010176926,0.01508591,0.06787367,0.0011627043,0.06169711,0.009059747,0.04155638,0.43507445],"study_design_scores_gemma":[0.000028556271,0.0007188449,0.50495684,0.00086421455,0.00015613194,0.011022445,0.18845586,0.0008044878,0.009331542,0.0016011462,0.28190786,0.00015207623],"about_ca_topic_score_codex":0.013312491,"about_ca_topic_score_gemma":0.03672328,"teacher_disagreement_score":0.0149346925,"about_ca_system_score_codex":0.0009660274,"about_ca_system_score_gemma":0.0019709077,"threshold_uncertainty_score":0.049961507},"labels":[],"label_agreement":null},{"id":"W4408197176","doi":"10.18280/ijsdp.200204","title":"Building Green Infrastructure of Yogyakarta International Airport Aerotropolis-A Case Study Using ENVI-met 5.6.1 Simulation Method","year":2025,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"International airport; Transport engineering; Business; Green infrastructure; Architectural engineering; Environmental planning; Environmental science; Engineering","score_opus":0.013538523103293343,"score_gpt":0.3050612015572421,"score_spread":0.29152267845394875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408197176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.983337,0.00006743689,0.0041382536,0.00013567576,0.00001318442,0.00007550341,0.00021522894,0.000055952107,0.011961782],"genre_scores_gemma":[0.9925396,0.00013713576,0.0043951343,0.000008457021,0.0000016814904,0.00004294174,0.0001477987,0.000013125325,0.0027142914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998048,0.000072477524,0.000006069406,0.000018323739,0.000026840635,0.00007158028],"domain_scores_gemma":[0.99982625,0.00007633934,0.000013911087,0.000019714722,0.000021718814,0.000042107076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032637914,0.0004885857,0.00033892193,0.00058482715,0.0009547708,0.0007862793,0.00058098754,0.0010098813,0.00267724],"category_scores_gemma":[0.00029882186,0.00029511523,0.0007232295,0.00065834227,0.0005370836,0.00083925115,0.0006645382,0.00051791186,0.00024250554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003705427,0.0007628041,0.026435597,0.00024798856,0.00006730393,0.009059327,0.0015531039,0.916519,0.011718593,0.009016454,0.00250233,0.021746831],"study_design_scores_gemma":[0.000104024584,0.0006512676,0.029844884,0.00011179233,0.00014021926,0.0005743879,0.00877815,0.9374727,0.011362404,0.0020694893,0.008793622,0.00009707685],"about_ca_topic_score_codex":0.04203209,"about_ca_topic_score_gemma":0.07799335,"teacher_disagreement_score":0.04203209,"about_ca_system_score_codex":0.0011795346,"about_ca_system_score_gemma":0.0011530217,"threshold_uncertainty_score":0.08357489},"labels":[],"label_agreement":null},{"id":"W4408478508","doi":"10.28946/sc.v31i1.3422","title":"Pola Bussines To Bussines Dalam Pengadaan Tanah Bagi Pembangunan Bandar Udara Kediri","year":2024,"lang":"en","type":"article","venue":"Simbur Cahaya","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.0031979126882024306,"score_gpt":0.18998273066570776,"score_spread":0.18678481797750532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408478508","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.501035,0.005319327,0.008786805,0.007322038,0.00067247526,0.00024707802,0.00154465,0.0002078854,0.47486475],"genre_scores_gemma":[0.86155576,0.0045631654,0.0054326802,0.00048201502,0.00004759727,0.00019518453,0.0007088771,0.00004769001,0.12696704],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997404,0.00006998701,0.0000145820995,0.000059900638,0.00006110229,0.000053982574],"domain_scores_gemma":[0.9994685,0.00013945893,0.00012370892,0.000018241393,0.00015945935,0.00009075215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030549362,0.0002731101,0.00015989698,0.0006691078,0.0020423108,0.0027307835,0.00025900337,0.00036756817,0.014072695],"category_scores_gemma":[0.0008753425,0.00017576435,0.00013244475,0.0016165483,0.0006352823,0.0011854661,0.0009069657,0.001026766,0.0016341772],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038044946,0.0007151158,0.15593038,0.0023287828,0.000081064885,0.0059054308,0.069422215,0.0039396994,0.003232752,0.16079645,0.098575205,0.49869248],"study_design_scores_gemma":[0.000017915208,0.00017395167,0.16345029,0.0007703421,0.000049998187,0.0011355614,0.14276762,0.0031179937,0.002434934,0.011915668,0.6741146,0.00005104454],"about_ca_topic_score_codex":0.013634521,"about_ca_topic_score_gemma":0.041183062,"teacher_disagreement_score":0.014072695,"about_ca_system_score_codex":0.002600918,"about_ca_system_score_gemma":0.0035888643,"threshold_uncertainty_score":0.047077835},"labels":[],"label_agreement":null},{"id":"W4409210519","doi":"10.51172/jbmb.v6i1.429","title":"Kesiapan Aktor dan Kebijakan dalam Mewujudkan Smart Mobility di Provinsi Bali","year":2025,"lang":"en","type":"article","venue":"Jurnal Bali Membangun Bali","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Materials science","score_opus":0.005794994410753289,"score_gpt":0.20654866540000763,"score_spread":0.20075367098925434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409210519","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73488164,0.0038126695,0.016395645,0.005473841,0.00020180533,0.0002469909,0.001941642,0.00023662162,0.2368091],"genre_scores_gemma":[0.9728337,0.0019799317,0.0045740777,0.00018163833,0.000020172452,0.00012037133,0.0006480913,0.000022326847,0.0196197],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9996418,0.00009409033,0.000022607708,0.0000747852,0.00010201455,0.0000647175],"domain_scores_gemma":[0.99973434,0.00007408182,0.000050172035,0.000017439737,0.00009082149,0.00003308433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004608215,0.00042803213,0.00025010091,0.0008449052,0.0011180749,0.003120059,0.00038448116,0.00038711855,0.007000338],"category_scores_gemma":[0.00072533364,0.00017522051,0.0002331463,0.0014388182,0.000809906,0.0013051616,0.0010025277,0.0007446773,0.00081779406],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030411134,0.0008106307,0.2604434,0.0022530516,0.00022978736,0.0043162284,0.018235452,0.026588496,0.0060610664,0.18163173,0.025889741,0.47323626],"study_design_scores_gemma":[0.00007656962,0.00036526602,0.43896708,0.0020835635,0.00030421192,0.0020457176,0.058613505,0.045167297,0.0067389393,0.05188265,0.39358512,0.00017016394],"about_ca_topic_score_codex":0.020862935,"about_ca_topic_score_gemma":0.0325791,"teacher_disagreement_score":0.020862935,"about_ca_system_score_codex":0.0029988792,"about_ca_system_score_gemma":0.0041931625,"threshold_uncertainty_score":0.041482985},"labels":[],"label_agreement":null},{"id":"W4409541800","doi":"10.30651/ag.v9i2.23803","title":"Studi Analisis Penyebab Kelongsoran Timbunan Dan Perencanaan Perkuatan Pada Ruas Jalan Tol Surabaya – Mojokerto STA 14+500 S.D. STA 15+350","year":2024,"lang":"id","type":"article","venue":"AGREGAT","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics","score_opus":0.011263280474163521,"score_gpt":0.21702206274343822,"score_spread":0.2057587822692747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409541800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9596163,0.017532248,0.0015083087,0.0007512038,0.00025049713,0.0010207772,0.0015139817,0.000048812515,0.017757745],"genre_scores_gemma":[0.94039583,0.0144248875,0.0029491978,0.000750579,0.00007466919,0.00097462384,0.0009538824,0.000049013444,0.03942726],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99822503,0.00047001883,0.00015671547,0.0002975954,0.00067090546,0.00017967139],"domain_scores_gemma":[0.99695575,0.0011864097,0.0005651091,0.00014433557,0.0009243761,0.0002239982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022206118,0.00044791878,0.000766978,0.0005190094,0.0005843034,0.0014762108,0.00045152922,0.00057985954,0.011338626],"category_scores_gemma":[0.0033311332,0.00030636106,0.00089287845,0.00062455627,0.00039368347,0.00089537073,0.0004746839,0.0010388156,0.0018050118],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.02289419,0.014109175,0.2527896,0.021177635,0.002255205,0.0018367502,0.018812897,0.0006795024,0.080849364,0.0021776946,0.013214396,0.5692037],"study_design_scores_gemma":[0.000706142,0.07390775,0.62693167,0.0045672944,0.004615162,0.0025118361,0.035965227,0.000719665,0.054111566,0.0018987539,0.19386235,0.000202599],"about_ca_topic_score_codex":0.0030501091,"about_ca_topic_score_gemma":0.0071185064,"teacher_disagreement_score":0.011338626,"about_ca_system_score_codex":0.00062387896,"about_ca_system_score_gemma":0.0014336734,"threshold_uncertainty_score":0.037931442},"labels":[],"label_agreement":null},{"id":"W4409711831","doi":"10.33489/mibj.v23i1.388","title":"Optimalisasi Skema Operasional Transshipment Batu Bara Terhadap Efektivitas Pencapaian Produktivitas","year":2025,"lang":"id","type":"article","venue":"Majalah Ilmiah Bahari Jogja","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Transshipment (information security); Agricultural science; Environmental science; Mathematics; Operations research","score_opus":0.008431922672894934,"score_gpt":0.21719549064576488,"score_spread":0.20876356797286993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409711831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.789649,0.003433415,0.059599217,0.002680182,0.00029429726,0.00035567782,0.0031839104,0.0005187088,0.14028569],"genre_scores_gemma":[0.91718733,0.0019947866,0.022540307,0.00031358423,0.000054080352,0.00022722867,0.0016550728,0.00020270959,0.055824902],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870956,0.00027346466,0.00007609208,0.00026396988,0.0004793901,0.0001974471],"domain_scores_gemma":[0.99729604,0.0008794548,0.0003377172,0.00029721722,0.0008528513,0.00033663455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019568074,0.0009787738,0.00063660456,0.0009930686,0.00093336083,0.003588155,0.00088796404,0.0006700826,0.028877635],"category_scores_gemma":[0.004115924,0.00039296655,0.0008155777,0.001028669,0.00065604766,0.0019333353,0.0019634538,0.0013745256,0.004036344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024747597,0.00144711,0.1877599,0.003090038,0.0005361788,0.0011628155,0.005766043,0.038918328,0.050076257,0.027317222,0.015398994,0.66605234],"study_design_scores_gemma":[0.00016454466,0.0040838313,0.62868667,0.0013046673,0.0007652647,0.0014492123,0.028642165,0.038221914,0.05594112,0.045968544,0.19439974,0.00037223607],"about_ca_topic_score_codex":0.007589701,"about_ca_topic_score_gemma":0.013459573,"teacher_disagreement_score":0.028877635,"about_ca_system_score_codex":0.0018864376,"about_ca_system_score_gemma":0.00260812,"threshold_uncertainty_score":0.09660536},"labels":[],"label_agreement":null},{"id":"W4411313163","doi":"10.56662/administraus.v9i2.292","title":"Efektivitas Pengelolaan Parkir Di Kelurahan Handil Bakti Kecamatan Alalak Oleh Dinas Perhubungan Kabupaten Barito Kuala","year":2025,"lang":"en","type":"article","venue":"Administraus","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics","score_opus":0.004797831615299422,"score_gpt":0.20508313024174543,"score_spread":0.200285298626446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411313163","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95864725,0.0032167495,0.0006690454,0.0010998708,0.00006369428,0.000051036448,0.00021127447,0.000035870704,0.036005314],"genre_scores_gemma":[0.9922031,0.0009779924,0.0006750346,0.00011038306,0.000010422972,0.000040705403,0.00008736441,0.000008939044,0.0058860183],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992409,0.00025621796,0.000033240758,0.00007883692,0.00016519343,0.00022565335],"domain_scores_gemma":[0.9990989,0.00040566007,0.00013490219,0.000029735482,0.00017785857,0.00015296994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008194146,0.00032288439,0.00030608955,0.00037868644,0.001112928,0.0016076281,0.00055243995,0.00045129406,0.013140007],"category_scores_gemma":[0.0014064634,0.0001349189,0.00027492948,0.00038269773,0.0007115337,0.0008053274,0.001415835,0.00047259126,0.0011315272],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016190959,0.0012121017,0.4467331,0.0049431156,0.00027447758,0.005547485,0.057009187,0.0016033131,0.02439463,0.008283931,0.013811746,0.43456787],"study_design_scores_gemma":[0.000045445584,0.0009444744,0.7442803,0.0011148175,0.00033243344,0.0022275127,0.13205096,0.0007424498,0.008951648,0.0027041486,0.10648307,0.00012279417],"about_ca_topic_score_codex":0.009367684,"about_ca_topic_score_gemma":0.030149609,"teacher_disagreement_score":0.013140007,"about_ca_system_score_codex":0.001156392,"about_ca_system_score_gemma":0.0017187194,"threshold_uncertainty_score":0.04395765},"labels":[],"label_agreement":null},{"id":"W4411586169","doi":"10.1007/s40314-025-03297-6","title":"Two maps of Georgia based on solving semi-discrete optimal transport problems: congressional districts and power plants maps","year":2025,"lang":"en","type":"article","venue":"Computational and Applied Mathematics","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Power (physics); Computer science; Mathematical optimization; Operations research; Geography; Mathematics; Physics","score_opus":0.006787889457023079,"score_gpt":0.2034118854398156,"score_spread":0.1966239959827925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411586169","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84231555,0.00033012862,0.093515545,0.0011542175,0.00012916148,0.00019803259,0.0046892245,0.0009318697,0.056736324],"genre_scores_gemma":[0.9525878,0.00012668307,0.041007712,0.000027450697,0.00001314742,0.00004847954,0.0018946872,0.000074246556,0.004219846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997893,0.00009278532,0.000005152481,0.000036872094,0.000041960007,0.000034006964],"domain_scores_gemma":[0.99940586,0.0003095216,0.000037364654,0.000065711356,0.00013743964,0.00004399077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033600375,0.00048125343,0.00051259564,0.0015243399,0.0006053065,0.0017128534,0.0006044763,0.0008544971,0.004119373],"category_scores_gemma":[0.0022844262,0.00033416803,0.0005961066,0.0016929593,0.0007340631,0.00082874775,0.00073871715,0.0007076821,0.00024575886],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017199546,0.00008008065,0.0051927287,0.00011166946,0.00003499319,0.000133078,0.00026997877,0.92459995,0.00083733496,0.041094285,0.0037281045,0.023745744],"study_design_scores_gemma":[0.000026098194,0.000034989247,0.008941637,0.000029848936,0.0000210863,0.000032087617,0.00052271335,0.9685752,0.00082640303,0.0154370405,0.005520456,0.000032332802],"about_ca_topic_score_codex":0.14209858,"about_ca_topic_score_gemma":0.16956943,"teacher_disagreement_score":0.14209858,"about_ca_system_score_codex":0.0017154097,"about_ca_system_score_gemma":0.001800901,"threshold_uncertainty_score":0.28254294},"labels":[],"label_agreement":null},{"id":"W4411771712","doi":"10.36040/upscales.v1i1.10036","title":"Analisis Faktor-Faktor Penyebab Masyarakat Bermukim Di Sempadan Rel Kereta Api Jl. Batang Hari - Jl. Karya Timur, Kecamatan Blimbing Kota Malang","year":2024,"lang":"id","type":"article","venue":"Urban Planning Spatial Culture Landscape Environment and Social studies","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Art","score_opus":0.0159102500488061,"score_gpt":0.2259545009341769,"score_spread":0.21004425088537082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411771712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8662116,0.0096281655,0.007890775,0.0035372414,0.0006645456,0.0012611136,0.013754277,0.0005249238,0.09652732],"genre_scores_gemma":[0.9134166,0.0044166776,0.008292027,0.00076502986,0.00013213117,0.0007322138,0.005451076,0.00009314977,0.0667011],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9962985,0.00057477586,0.00044599493,0.00049641717,0.0016338791,0.00055049977],"domain_scores_gemma":[0.9922454,0.002175275,0.001598118,0.0004966059,0.0030848212,0.00039974216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002312556,0.0008721906,0.0006814097,0.0028148794,0.0014398017,0.0029983858,0.0005693031,0.00078944006,0.019833757],"category_scores_gemma":[0.0068724724,0.00035376273,0.00072094385,0.0025406796,0.0007802039,0.0016411805,0.0012955737,0.0013622618,0.005242332],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009215714,0.00043970745,0.6851799,0.0028422426,0.0002675025,0.0019758525,0.009921188,0.00066153356,0.014318209,0.0033560733,0.024752844,0.25536337],"study_design_scores_gemma":[0.000028615372,0.00066078687,0.7992439,0.00074735633,0.00029575336,0.0027226296,0.034459077,0.001000985,0.016033817,0.0012759467,0.14339761,0.00013354761],"about_ca_topic_score_codex":0.012351493,"about_ca_topic_score_gemma":0.015598995,"teacher_disagreement_score":0.019833757,"about_ca_system_score_codex":0.0013581675,"about_ca_system_score_gemma":0.0022035188,"threshold_uncertainty_score":0.06635046},"labels":[],"label_agreement":null},{"id":"W4412813320","doi":"10.7454/cudj.v3i1.1034","title":"TINJAUAN LITERATUR : IMPLEMENTASI KONSEP TRANSPORTASI BERKELANJUTAN TERHADAP PERENCANAAN KAWASAN PERMUKIMAN PERKOTAAN TERPADU SOREANG","year":2025,"lang":"ms","type":"article","venue":"Cities and Urban Development Journal","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Business","score_opus":0.006492402006486309,"score_gpt":0.2042634793450648,"score_spread":0.1977710773385785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412813320","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15606762,0.023047473,0.016797693,0.023569359,0.004821462,0.00084913836,0.0026247657,0.0014763428,0.7707461],"genre_scores_gemma":[0.5352359,0.02933821,0.026732342,0.0022146814,0.00033198146,0.00064207934,0.0021933755,0.00048734585,0.40282413],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990895,0.00023886721,0.000090291454,0.00013651101,0.0003044237,0.00014040177],"domain_scores_gemma":[0.9987437,0.00026720244,0.00011324113,0.00007276027,0.00062327966,0.00017983522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015588432,0.0003676027,0.00032181738,0.0006696491,0.0016686574,0.004469829,0.00073287723,0.0007481695,0.0590814],"category_scores_gemma":[0.002717817,0.00020921057,0.00022994391,0.0012245178,0.0005011079,0.0026217627,0.0016107284,0.0013825604,0.014831119],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028147778,0.00075081433,0.014494577,0.0027932846,0.000040417366,0.0016337384,0.013780277,0.0017227384,0.0037513715,0.03195215,0.14013243,0.7886667],"study_design_scores_gemma":[0.000024287465,0.00018020386,0.0134854205,0.0014440898,0.000059925453,0.00056136795,0.012455768,0.0010913991,0.0030802253,0.002625033,0.96495116,0.000041089337],"about_ca_topic_score_codex":0.0069303703,"about_ca_topic_score_gemma":0.010282025,"teacher_disagreement_score":0.0590814,"about_ca_system_score_codex":0.0018009834,"about_ca_system_score_gemma":0.007568726,"threshold_uncertainty_score":0.19764698},"labels":[],"label_agreement":null},{"id":"W4413232096","doi":"10.35965/jups.v5i3.848","title":"Pengaruh Kawasan Berorientasi Transit terhadap Gentrifikasi Sosial Ekonomi: Studi Kasus Kawasan Stasiun Manggarai","year":2025,"lang":"en","type":"article","venue":"Journal of Urban Planning Studies","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Geography; Forestry","score_opus":0.02066342952240627,"score_gpt":0.27096939928023656,"score_spread":0.25030596975783026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413232096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99924445,0.0001160202,0.000016352913,0.000027642045,0.0000027474905,0.000005295558,0.00001669771,5.042897e-7,0.0005703293],"genre_scores_gemma":[0.9986786,0.00032320942,0.000039272774,0.000015084621,0.000002399411,0.000008833294,0.000030339486,9.862954e-7,0.000901262],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998828,0.000021351108,0.000008834977,0.000023362929,0.000019832605,0.000043906963],"domain_scores_gemma":[0.99979144,0.00005371889,0.00004910547,0.0000099040135,0.000031765285,0.00006402313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021563463,0.0002995812,0.00026178418,0.0005232612,0.0009903475,0.00077530264,0.00018896819,0.00024134504,0.0028139132],"category_scores_gemma":[0.00041210357,0.00022766681,0.0002530473,0.0006421118,0.00041368426,0.0005451618,0.00058178854,0.00041534964,0.00040706678],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004203692,0.00016922214,0.96492565,0.000076617405,0.000032302585,0.0008650328,0.02210803,0.00006151581,0.00092749303,0.00028424963,0.00031159137,0.010196247],"study_design_scores_gemma":[0.000001791543,0.00011963296,0.9612414,0.000049776834,0.00003798798,0.00027440098,0.036114763,0.00011677467,0.00016076727,0.00007421807,0.0017997415,0.000008711309],"about_ca_topic_score_codex":0.023640728,"about_ca_topic_score_gemma":0.069434404,"teacher_disagreement_score":0.023640728,"about_ca_system_score_codex":0.0005536278,"about_ca_system_score_gemma":0.0007665941,"threshold_uncertainty_score":0.04700625},"labels":[],"label_agreement":null},{"id":"W4413343559","doi":"10.29313/bcsurp.v5i2.21489","title":"Analisis Pelayanan Jalur Pedestrian di Jalan Kebon Kawung Kota Bandung","year":2025,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Pedestrian; Transport engineering; Engineering","score_opus":0.019577017364313682,"score_gpt":0.22725050809290798,"score_spread":0.20767349072859428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413343559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99011165,0.00046226985,0.00030059714,0.0003672236,0.00005008619,0.000068262234,0.00033340327,0.00001230685,0.008294309],"genre_scores_gemma":[0.9921589,0.0010101679,0.00053392746,0.00013766669,0.000014737506,0.00010656944,0.00028072303,0.000009672505,0.0057475106],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995215,0.00014861129,0.000042252705,0.00005481539,0.00012172743,0.00011097613],"domain_scores_gemma":[0.99927026,0.00017783768,0.00013438803,0.000024995787,0.00028918698,0.00010329842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005645383,0.0003128287,0.00031832594,0.0014572894,0.0021437858,0.0009332138,0.00037485707,0.00041608693,0.008529865],"category_scores_gemma":[0.0014773154,0.00022061772,0.00029795023,0.001376861,0.00053994625,0.00079373247,0.0010524743,0.00057415484,0.0010529481],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035570556,0.0003251992,0.44591978,0.002065483,0.00007273662,0.015028625,0.4200116,0.00016561434,0.0055181147,0.0029011762,0.010701652,0.09693433],"study_design_scores_gemma":[0.0000031862246,0.00016871653,0.2806962,0.00035837255,0.000038709917,0.0026897483,0.6860553,0.00015606213,0.0009603754,0.00021841413,0.02861579,0.000039208524],"about_ca_topic_score_codex":0.00694619,"about_ca_topic_score_gemma":0.012816097,"teacher_disagreement_score":0.008529865,"about_ca_system_score_codex":0.0010048533,"about_ca_system_score_gemma":0.00077481306,"threshold_uncertainty_score":0.028535247},"labels":[],"label_agreement":null},{"id":"W4413343749","doi":"10.29313/bcsurp.v5i2.20126","title":"Faktor-Faktor yang Mempengaruhi Minat Masyarakat Menggunakan Commuter Line di Wilayah Kabupaten Lebak","year":2025,"lang":"en","type":"article","venue":"Bandung Conference Series Urban & Regional Planning","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Physics; Humanities; Mathematics; Art","score_opus":0.022438593646378995,"score_gpt":0.23097280384399943,"score_spread":0.20853421019762045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413343749","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8431394,0.017613234,0.0024107348,0.008167374,0.0020331345,0.00016812822,0.0012599429,0.00032909415,0.12487891],"genre_scores_gemma":[0.94088626,0.007957582,0.0018857406,0.00055968884,0.0002894904,0.00010515319,0.0007193911,0.000037799196,0.04755899],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99943715,0.00015922003,0.000048135407,0.00007681307,0.00017245483,0.000106320134],"domain_scores_gemma":[0.9991447,0.0002927519,0.00017692728,0.000060345057,0.00022355553,0.00010183243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089524104,0.0005266141,0.00031682212,0.00062340253,0.0014173804,0.0021783663,0.00032267915,0.00048063547,0.029138284],"category_scores_gemma":[0.0014240246,0.00014579305,0.00019410059,0.0008593394,0.0004886057,0.0008179994,0.0008809672,0.0006195008,0.0042737746],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058667746,0.0005081809,0.19344874,0.002879336,0.00013667111,0.008229474,0.020934695,0.00094082893,0.012323155,0.019740773,0.07739225,0.6628792],"study_design_scores_gemma":[0.00007598717,0.00040907238,0.30071184,0.0016268572,0.00020304855,0.0067112125,0.036449432,0.0022114015,0.011458401,0.0032003648,0.6367977,0.00014459007],"about_ca_topic_score_codex":0.0017759138,"about_ca_topic_score_gemma":0.0022104944,"teacher_disagreement_score":0.029138284,"about_ca_system_score_codex":0.0008735458,"about_ca_system_score_gemma":0.0016263933,"threshold_uncertainty_score":0.09747732},"labels":[],"label_agreement":null},{"id":"W4414076603","doi":"10.18280/ijsse.150707","title":"Bus Drivers’ Perspectives on Factors Contributing to Road Traffic RTAs on Prithvi and Mugling-Narayanghat Highway Segment in Nepal","year":2025,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Pokhara University Research Center; Pokhara University","keywords":"Road traffic; Poison control; Occupational safety and health; Human factors and ergonomics; Injury prevention","score_opus":0.003392114075775733,"score_gpt":0.20040904941998922,"score_spread":0.1970169353442135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414076603","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9992042,0.000043255655,0.000015442722,0.00009916853,0.0000020518353,0.000003361579,0.000017153254,6.1628657e-7,0.0006147933],"genre_scores_gemma":[0.999474,0.00013384745,0.00002921063,0.00003654335,0.0000016748877,0.000006903153,0.000024165362,4.974779e-7,0.00029324915],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9996506,0.00013882953,0.000021157806,0.0000290734,0.000065653025,0.00009459302],"domain_scores_gemma":[0.9992749,0.00019157413,0.00020292835,0.0000174342,0.0001331352,0.00017992177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004610267,0.00014749519,0.0001996052,0.00050874124,0.0013418243,0.001166599,0.0002698239,0.00044492717,0.0015318065],"category_scores_gemma":[0.0013801103,0.00018472591,0.00020418892,0.00044770088,0.0006012932,0.00058507523,0.001051065,0.0006088806,0.00018492487],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061142026,0.00014568775,0.8072282,0.000096181575,0.000036888574,0.0016626081,0.17501616,0.0001423452,0.0012870695,0.00038054865,0.00069595804,0.013247215],"study_design_scores_gemma":[0.0000024093508,0.00014715179,0.60159504,0.000057243535,0.000016961401,0.00049619493,0.39389783,0.00018468134,0.000167415,0.000100958634,0.003309121,0.000024960695],"about_ca_topic_score_codex":0.023464192,"about_ca_topic_score_gemma":0.05004785,"teacher_disagreement_score":0.023464192,"about_ca_system_score_codex":0.00065452815,"about_ca_system_score_gemma":0.0008136523,"threshold_uncertainty_score":0.046655238},"labels":[],"label_agreement":null},{"id":"W4414146293","doi":"10.37253/leader.v2i6.10594","title":"Analisa Perkerasan Jalan Kaku menggunakan Metode Bina Marga dan PCI (Studi Kasus: Jalan Majalengka-Rajagaluh)","year":2024,"lang":"id","type":"article","venue":"Leader Civil Engineering and Architecture Journal","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"","score_opus":0.00747307142647239,"score_gpt":0.19178057442572544,"score_spread":0.18430750299925305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414146293","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9679865,0.0045130965,0.0012838218,0.00040476068,0.000073282376,0.00026090356,0.002979608,0.00005648681,0.022441518],"genre_scores_gemma":[0.96795166,0.002401189,0.003063042,0.00023039819,0.000029412295,0.00033484335,0.0013383355,0.00005367993,0.024597418],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99926096,0.00021327038,0.000057522437,0.00017147038,0.00020790087,0.00008888253],"domain_scores_gemma":[0.999032,0.00039988797,0.00018475358,0.000060801343,0.00024160171,0.00008098558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010828283,0.00039219242,0.00050528004,0.0010318024,0.00066374853,0.001984077,0.0005154177,0.0005041771,0.011068809],"category_scores_gemma":[0.0016836437,0.0003526189,0.00070107984,0.0016067069,0.00040937174,0.0010156773,0.0008226246,0.00087726343,0.0022520325],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002804686,0.0012474138,0.7090395,0.0036606914,0.00079891336,0.0010430665,0.02711046,0.000682726,0.014835077,0.0035254043,0.0075788954,0.22767313],"study_design_scores_gemma":[0.000032556713,0.0010482335,0.92498666,0.00043147898,0.00046810653,0.00046842205,0.024783509,0.00040905093,0.0045651346,0.0008416124,0.04191469,0.000050604707],"about_ca_topic_score_codex":0.013511197,"about_ca_topic_score_gemma":0.029826164,"teacher_disagreement_score":0.013511197,"about_ca_system_score_codex":0.0010502246,"about_ca_system_score_gemma":0.0011326931,"threshold_uncertainty_score":0.03702891},"labels":[],"label_agreement":null},{"id":"W4414146295","doi":"10.37253/leader.v2i6.10593","title":"Pengaruh Kepadatan Lalu Lintas Terhadap Perkerasan Jalan di Jalan K.H. Abdul Halim (STA 0+000-STA 3+000)","year":2024,"lang":"id","type":"article","venue":"Leader Civil Engineering and Architecture Journal","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"High Gravity","score_opus":0.007705662443493855,"score_gpt":0.19365054386695102,"score_spread":0.18594488142345716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414146295","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33486742,0.053806737,0.008339073,0.022050854,0.007865545,0.00067794014,0.0040204297,0.002070516,0.56630147],"genre_scores_gemma":[0.30720094,0.018889815,0.010826661,0.0024545651,0.00075775525,0.00036876986,0.0019008516,0.00040268264,0.6571979],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99957544,0.000073346586,0.000025856152,0.00009102677,0.000113584734,0.000120810735],"domain_scores_gemma":[0.999371,0.00008703293,0.00005796062,0.00003336248,0.00026442044,0.00018616032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008012326,0.00074177096,0.0004901135,0.001199108,0.0026341244,0.0025808564,0.0007515892,0.0009794594,0.0760413],"category_scores_gemma":[0.0007630014,0.0004090093,0.00055174273,0.0009915276,0.00065220246,0.0011027965,0.0016707304,0.0014070007,0.021540087],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002035792,0.0009923805,0.030351019,0.002205245,0.00012108685,0.002378868,0.007300443,0.0005432795,0.028430345,0.014752063,0.14835535,0.7625341],"study_design_scores_gemma":[0.000062756655,0.00062048686,0.03937312,0.0005368166,0.00009161919,0.0014051116,0.006186048,0.00027258872,0.0070762653,0.0013054907,0.94299984,0.00006986025],"about_ca_topic_score_codex":0.0086881425,"about_ca_topic_score_gemma":0.026144223,"teacher_disagreement_score":0.0760413,"about_ca_system_score_codex":0.00151529,"about_ca_system_score_gemma":0.0033743428,"threshold_uncertainty_score":0.2543835},"labels":[],"label_agreement":null},{"id":"W4414777537","doi":"10.24912/jmts.v8i2.31756","title":"EVALUASI KINERJA SIMPANG BERSINYAL JALAN GALUNGGUNG-JALAN BONDOWOSO-JALAN RAYA TIDAR DENGAN MENGGUNAKAN PROGRAM PTV VISSIM 9.0","year":2025,"lang":"en","type":"article","venue":"JMTS Jurnal Mitra Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"VisSim; Traffic volume; Intersection (aeronautics); Road traffic; Travel time","score_opus":0.004073590652855299,"score_gpt":0.23136919168499404,"score_spread":0.22729560103213875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414777537","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85855746,0.00058007886,0.08100524,0.00043966452,0.00019800401,0.00032672577,0.0032697096,0.006756378,0.048866693],"genre_scores_gemma":[0.9374678,0.0005024753,0.0486206,0.000042970158,0.000016707985,0.00023470855,0.0035249055,0.00040696326,0.009182816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923754,0.00018315291,0.00004229391,0.00010164037,0.00035039368,0.00008496721],"domain_scores_gemma":[0.99842393,0.00055568764,0.00012245818,0.00012375583,0.0006564739,0.00011769311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001528788,0.00091580796,0.00048084764,0.0009725161,0.00030931586,0.0016973474,0.00061787455,0.0003508337,0.007450573],"category_scores_gemma":[0.0031982348,0.000309994,0.0006309773,0.0008779354,0.00023703449,0.0011385526,0.00070043,0.0006496456,0.0018511342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016867691,0.0014764196,0.08825551,0.0012564901,0.0002773425,0.00048398,0.0012351634,0.514221,0.02676651,0.008141497,0.022052057,0.33414719],"study_design_scores_gemma":[0.000076811244,0.0011709151,0.036918588,0.00016042705,0.00019285314,0.00015793895,0.001464316,0.9060026,0.028889878,0.0018390695,0.023024548,0.000102034246],"about_ca_topic_score_codex":0.0077635325,"about_ca_topic_score_gemma":0.007738306,"teacher_disagreement_score":0.0077635325,"about_ca_system_score_codex":0.00079151534,"about_ca_system_score_gemma":0.001372751,"threshold_uncertainty_score":0.024924695},"labels":[],"label_agreement":null},{"id":"W4414917509","doi":"10.26593/jtrans.v23i3.7554.208-217","title":"ANALISIS SPASIAL KINERJA JALAN DAN SIMPANG DI KABUPATEN KUDUS","year":2023,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Intersection (aeronautics); Data collection; Road traffic; Data collection system; Schema crosswalk","score_opus":0.014153052790851979,"score_gpt":0.20883386768691672,"score_spread":0.19468081489606476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414917509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97920185,0.00066974125,0.0012076224,0.00012787942,0.000027321415,0.000087358516,0.001758618,0.00007779644,0.016841838],"genre_scores_gemma":[0.98932564,0.0006509205,0.0025173675,0.000032007512,0.0000103514485,0.000084478444,0.0014111318,0.000016955395,0.005951038],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99943,0.0001051186,0.000048803453,0.00008854812,0.00023544855,0.00009198998],"domain_scores_gemma":[0.9992964,0.0001389883,0.00009695686,0.00004279694,0.00036592464,0.000058830195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061278464,0.00044677805,0.00032832907,0.0032073075,0.0009865203,0.0013598371,0.00036553218,0.00022741017,0.0054586506],"category_scores_gemma":[0.0012193727,0.00012835323,0.0002752248,0.0039006115,0.00052611565,0.0005807772,0.00070742285,0.00030640312,0.0008845528],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036585933,0.000174167,0.7314495,0.0009560213,0.000138631,0.0023139676,0.024458757,0.00204783,0.0075078593,0.0036942363,0.0080507295,0.21884245],"study_design_scores_gemma":[0.000004683311,0.00011399813,0.9000744,0.0002370559,0.00008188363,0.0006078593,0.05045062,0.0021532488,0.0033385684,0.0006396744,0.042262547,0.00003546983],"about_ca_topic_score_codex":0.02908172,"about_ca_topic_score_gemma":0.054743394,"teacher_disagreement_score":0.02908172,"about_ca_system_score_codex":0.0012018633,"about_ca_system_score_gemma":0.00093273516,"threshold_uncertainty_score":0.05782491},"labels":[],"label_agreement":null},{"id":"W4414918031","doi":"10.26593/jtrans.v23i1.6648.19-28","title":"PENENTUAN POTENSI LOKASI SIMPUL-SIMPUL TRANSPORTASI DI KOTA BARU PATIMBAN","year":2023,"lang":"en","type":"article","venue":"Jurnal Transportasi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Baru; Metropolitan area; Space syntax; Port (circuit theory)","score_opus":0.010754155888214356,"score_gpt":0.19622712024572675,"score_spread":0.1854729643575124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414918031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9514107,0.00057950994,0.0024643282,0.00052199484,0.000025458625,0.0001062404,0.0010196808,0.00008268505,0.043789353],"genre_scores_gemma":[0.9909112,0.00032220694,0.001669764,0.00002562072,0.000005013976,0.00005631419,0.0003199731,0.000009567191,0.0066805445],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999724,0.00005594518,0.000017012808,0.000043049033,0.00009084359,0.00006911695],"domain_scores_gemma":[0.99960405,0.00011680369,0.00007836469,0.00002455866,0.00013263113,0.000043519456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022170918,0.00036564053,0.00020948683,0.0020579817,0.0013577958,0.002043674,0.00037481598,0.00027484485,0.011068605],"category_scores_gemma":[0.00090035534,0.0001780795,0.00025066358,0.0031019123,0.00064324494,0.00086343754,0.0013345344,0.00034674845,0.00072909606],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047245872,0.00023523693,0.59976476,0.001734856,0.00016080933,0.0136097055,0.04262667,0.0072554993,0.013831577,0.051609002,0.010695178,0.25800425],"study_design_scores_gemma":[0.000023158325,0.0002325858,0.7129235,0.00064666127,0.00020948448,0.0039902995,0.12381711,0.00943388,0.006024276,0.008813034,0.13379437,0.00009163183],"about_ca_topic_score_codex":0.020772813,"about_ca_topic_score_gemma":0.048769914,"teacher_disagreement_score":0.020772813,"about_ca_system_score_codex":0.0014020089,"about_ca_system_score_gemma":0.0013550945,"threshold_uncertainty_score":0.041303813},"labels":[],"label_agreement":null},{"id":"W4415001684","doi":"10.14710/jpk.12.2.174-189","title":"TINJAUAN BIBLIOMETRIK: MANAJEMEN RISIKO BENCANA, BAHAYA, DAN KERENTANAN DALAM INFRASTRUKTUR TRANSPORTASI","year":2024,"lang":"id","type":"article","venue":"Jurnal Pengembangan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Regional studies","score_opus":0.012847298012418885,"score_gpt":0.23303125505720293,"score_spread":0.22018395704478405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415001684","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5357004,0.04178128,0.004058835,0.014495521,0.0009784815,0.0003544376,0.029892465,0.0007683515,0.3719703],"genre_scores_gemma":[0.93239266,0.018001217,0.0040738126,0.00047077145,0.00020435557,0.00022345697,0.0073271627,0.0001665851,0.037139937],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942794,0.0009974993,0.00067482534,0.0005692929,0.0030252098,0.00045387927],"domain_scores_gemma":[0.98448443,0.005426996,0.0027951023,0.0008841308,0.0056788656,0.0007303594],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.003462237,0.0004078584,0.00082061294,0.016757466,0.0034053514,0.010067498,0.00077406585,0.00065947446,0.02473293],"category_scores_gemma":[0.021054907,0.0003208897,0.0005256823,0.049434002,0.0012867025,0.0032408948,0.002750379,0.00079201366,0.0028952893],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020836807,0.000090033034,0.50147706,0.006662138,0.000522544,0.0013506315,0.04293678,0.0007527088,0.001726039,0.025900185,0.04647544,0.3718981],"study_design_scores_gemma":[0.0000161702,0.00005644498,0.61353606,0.0032756636,0.00041349744,0.0011559176,0.09887433,0.0006246183,0.0013995771,0.0060597844,0.27447256,0.00011542173],"about_ca_topic_score_codex":0.10749979,"about_ca_topic_score_gemma":0.14775026,"teacher_disagreement_score":0.9832425,"about_ca_system_score_codex":0.006349298,"about_ca_system_score_gemma":0.013267226,"threshold_uncertainty_score":0.2137481},"labels":[],"label_agreement":null},{"id":"W4415002146","doi":"10.33005/kern.v11i2.74","title":"Analisis Tingkat Kerusakan Perkerasan Jalan Lentur Menggunakan Metode Bina Marga dan Aplikasi Roadlab Pro","year":2025,"lang":"id","type":"article","venue":"KERN Jurnal Ilmiah Teknik Sipil","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"International Roughness Index; Wharf","score_opus":0.00989709222685693,"score_gpt":0.2274498157102182,"score_spread":0.21755272348336127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415002146","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9155696,0.0010819722,0.0050815805,0.00058132707,0.00010178578,0.0003312041,0.012774482,0.00034275572,0.06413537],"genre_scores_gemma":[0.9205237,0.0010930336,0.008546609,0.0002718174,0.000033600187,0.00045087122,0.008851321,0.00024532198,0.059983805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985429,0.0002179051,0.00009733226,0.00028242698,0.0006678262,0.00019160037],"domain_scores_gemma":[0.99666864,0.0008173105,0.00032948217,0.00017572264,0.0018310563,0.00017783573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010477159,0.00055503804,0.0004988674,0.0016669093,0.0010800894,0.0022571061,0.0006185586,0.0005494501,0.017615616],"category_scores_gemma":[0.0022848947,0.0002727835,0.0006157852,0.0026437405,0.0004528167,0.0012021649,0.0009973162,0.0008257586,0.0046685115],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015884752,0.000439891,0.66130733,0.0020678162,0.00042963497,0.0012001783,0.011391959,0.0022844905,0.052450873,0.0023705019,0.017563628,0.24690512],"study_design_scores_gemma":[0.000015470307,0.00045566497,0.85747015,0.00020061393,0.00017148607,0.0004450836,0.023458913,0.0010586064,0.017830819,0.00059038715,0.098227635,0.00007525498],"about_ca_topic_score_codex":0.025436852,"about_ca_topic_score_gemma":0.05870628,"teacher_disagreement_score":0.025436852,"about_ca_system_score_codex":0.0011957444,"about_ca_system_score_gemma":0.0014462349,"threshold_uncertainty_score":0.0589301},"labels":[],"label_agreement":null},{"id":"W4415044011","doi":"10.53625/jirk.v5i4.11204","title":"PERENCANAAN INFRASTRUKTUR BERKELANJUTAN DI KABUPATEN MAHAKAM ULU: PEMETAAN AKSESIBILITAS DAN POTENSI PENGEMBANGAN WILAYAH SEBAGAI DAERAH PENYANGGA IKN","year":2025,"lang":"id","type":"article","venue":"Journal of Innovation Research and Knowledge","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Land use; Unit (ring theory); Voronoi diagram","score_opus":0.042538946172610136,"score_gpt":0.33117436242423975,"score_spread":0.28863541625162964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415044011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7057082,0.012260532,0.032622118,0.006446721,0.0005271075,0.00029335305,0.0012423169,0.00076678,0.24013276],"genre_scores_gemma":[0.93348813,0.0043267636,0.010421372,0.00038878756,0.000060777398,0.00012929481,0.0004287718,0.00011346876,0.050642576],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9990596,0.00017833937,0.00004002693,0.00019912145,0.0002939419,0.0002289757],"domain_scores_gemma":[0.99897635,0.00025333377,0.00014521604,0.00009964908,0.00031794148,0.0002075016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007635699,0.00069373933,0.0004984862,0.0014219176,0.0029656051,0.0066539943,0.00114177,0.0011577747,0.0150082465],"category_scores_gemma":[0.0018981085,0.00045573906,0.00048037848,0.0020409836,0.0017770268,0.0033896868,0.0039429227,0.0012326421,0.002964896],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078177126,0.00047724726,0.12878634,0.0026314408,0.00032595132,0.0070342436,0.050509967,0.0057022218,0.03228659,0.08810718,0.018308813,0.6650483],"study_design_scores_gemma":[0.00003584597,0.000556738,0.2371583,0.0018617478,0.00041945587,0.0037510227,0.13181092,0.0066726264,0.024608767,0.034905724,0.55792737,0.00029156203],"about_ca_topic_score_codex":0.021357378,"about_ca_topic_score_gemma":0.038486097,"teacher_disagreement_score":0.021357378,"about_ca_system_score_codex":0.0030857553,"about_ca_system_score_gemma":0.0045413757,"threshold_uncertainty_score":0.050207555},"labels":[],"label_agreement":null},{"id":"W4415096285","doi":"10.25170/perkotaan.v17i1.6663","title":"Rasionalitas Pengguna Layanan Bus Rapid Transit (BRT) Transjakarta, Batik Trans Solo, dan Transjogja Pada Pilihan Transportasi Publik","year":2025,"lang":"id","type":"article","venue":"Jurnal Perkotaan","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Public transport","score_opus":0.010126943288918213,"score_gpt":0.21495328053880836,"score_spread":0.20482633724989013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415096285","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15752345,0.010330914,0.111768365,0.010181185,0.0020614706,0.001861866,0.006663874,0.002714537,0.69689435],"genre_scores_gemma":[0.530289,0.01457745,0.102198005,0.0017127888,0.0006350496,0.0017345668,0.0043092556,0.0015434907,0.34300026],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99354446,0.0018761042,0.00033434757,0.0007619425,0.0030282033,0.0004550467],"domain_scores_gemma":[0.98724234,0.0059670764,0.0009858267,0.0011905502,0.0040134876,0.00060058985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006877596,0.0012030223,0.0006496019,0.0040180753,0.0024665361,0.010302819,0.0010524818,0.0011511303,0.06245962],"category_scores_gemma":[0.016842088,0.0006572692,0.0009463058,0.0055697164,0.0020748086,0.008385302,0.0039933003,0.0018646172,0.012653059],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005386936,0.00030550433,0.034323413,0.0038128798,0.00017048302,0.00054319104,0.018285703,0.0024169986,0.007246468,0.10006814,0.057766393,0.7745221],"study_design_scores_gemma":[0.00007499238,0.00060286233,0.055622604,0.00248074,0.0003143084,0.0008670436,0.045203898,0.005091908,0.015156066,0.0387467,0.83556324,0.00027565498],"about_ca_topic_score_codex":0.009031352,"about_ca_topic_score_gemma":0.018513195,"teacher_disagreement_score":0.06245962,"about_ca_system_score_codex":0.003760062,"about_ca_system_score_gemma":0.0054055154,"threshold_uncertainty_score":0.20894825},"labels":[],"label_agreement":null},{"id":"W4415307190","doi":"10.29408/geodika.v9i3.29774","title":"Analisis Perkembangan Area Terbangun di Kota Padang","year":2025,"lang":"","type":"article","venue":"Geodika Jurnal Kajian Ilmu dan Pendidikan Geografi","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"City area; Hydrology (agriculture); Land area; Population","score_opus":0.007226610708750795,"score_gpt":0.20785081234070044,"score_spread":0.20062420163194963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415307190","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95657533,0.0021087588,0.003159689,0.00054166646,0.00007224645,0.00012745816,0.009798469,0.00013201479,0.027484424],"genre_scores_gemma":[0.9803247,0.0010562479,0.0028239107,0.00007993167,0.000013654576,0.00008836499,0.0039950465,0.000051147974,0.011566915],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999511,0.00007424844,0.000039329017,0.000097051234,0.00016929329,0.000109055625],"domain_scores_gemma":[0.9993667,0.000120407814,0.000093670824,0.00004470897,0.00031371712,0.00006082345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003375558,0.00039442576,0.00037943592,0.0020026127,0.0008983399,0.0017659956,0.00042952813,0.00037854858,0.0057522454],"category_scores_gemma":[0.0009411025,0.00022176332,0.000566772,0.0041828677,0.00046954057,0.00083448895,0.0010605893,0.0005147218,0.0009888046],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038664637,0.00011065757,0.85233885,0.0015281343,0.00037639705,0.002538889,0.010233713,0.002854114,0.012967915,0.004478558,0.008474343,0.10371191],"study_design_scores_gemma":[0.000007211349,0.0000621967,0.9233724,0.00021352251,0.00016039553,0.00068954116,0.02074963,0.0020909659,0.0032566884,0.0007374463,0.048619222,0.000040762137],"about_ca_topic_score_codex":0.08073347,"about_ca_topic_score_gemma":0.20038229,"teacher_disagreement_score":0.08073347,"about_ca_system_score_codex":0.0011590541,"about_ca_system_score_gemma":0.0017187339,"threshold_uncertainty_score":0.16052711},"labels":[],"label_agreement":null},{"id":"W4415604769","doi":"10.36456/zjnhhm43","title":"Analisis Spatial Econometric Perilaku Pergerakan Masyarakat di Kota Makassar","year":2025,"lang":"","type":"article","venue":"Jurnal Plano Buana","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Three gorges","score_opus":0.007664894274657489,"score_gpt":0.2047971127854534,"score_spread":0.1971322185107959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415604769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90518105,0.0046517933,0.040944643,0.005146456,0.0002841632,0.00018801738,0.009432764,0.0005046161,0.03366652],"genre_scores_gemma":[0.9713112,0.0011914715,0.0036064791,0.0001453012,0.000057420595,0.00007063157,0.003193366,0.000097713826,0.020326333],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984041,0.00064343965,0.00010223085,0.00032638301,0.00029161767,0.00023221933],"domain_scores_gemma":[0.99095285,0.0060755657,0.00089654,0.00065536774,0.0010083782,0.00041142982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024188994,0.0005157858,0.000898285,0.0011303062,0.0007687708,0.0037366378,0.00082999247,0.0007153841,0.01807115],"category_scores_gemma":[0.009557264,0.00040993287,0.001608962,0.0037003765,0.00053820026,0.0013879105,0.0013951621,0.0016342665,0.0027609554],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038457912,0.0002888482,0.81636184,0.00068398315,0.0018615619,0.0015255753,0.0021673536,0.059950657,0.0010605166,0.027602933,0.018029109,0.07008304],"study_design_scores_gemma":[0.00006881824,0.00025185477,0.71835357,0.00034577464,0.0014071688,0.00066612597,0.015608132,0.17613544,0.0016757861,0.02399082,0.06134012,0.00015643187],"about_ca_topic_score_codex":0.106080785,"about_ca_topic_score_gemma":0.07613608,"teacher_disagreement_score":0.106080785,"about_ca_system_score_codex":0.0019514257,"about_ca_system_score_gemma":0.0028161083,"threshold_uncertainty_score":0.21092665},"labels":[],"label_agreement":null},{"id":"W563622207","doi":"","title":"Development of a Screening Tool for Roundabout Feasibility in Winnipeg","year":2014,"lang":"fr","type":"article","venue":"Transportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Roundabout; Context (archaeology); Transport engineering; Traffic calming; Set (abstract data type); Engineering; Constructability; Risk analysis (engineering); Computer science; Operations research; Systems engineering","score_opus":0.00976919632213454,"score_gpt":0.2043430318483215,"score_spread":0.19457383552618696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W563622207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48637962,0.03441407,0.2222637,0.007216482,0.00083133584,0.02800531,0.015578737,0.0019311964,0.20337956],"genre_scores_gemma":[0.46765408,0.022264138,0.47979796,0.00073373097,0.00006579935,0.00634053,0.0059630093,0.00025811227,0.016922627],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.987951,0.0043687443,0.001675556,0.0006365153,0.00476376,0.0006044342],"domain_scores_gemma":[0.9313632,0.028294163,0.0053107566,0.0011047592,0.03281102,0.0011161577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021311793,0.00081641244,0.0009793941,0.02040171,0.0027842463,0.005095306,0.0024849453,0.00093835377,0.006279518],"category_scores_gemma":[0.050858606,0.00084357423,0.0012418855,0.010820256,0.0011936271,0.0025356058,0.0024638895,0.00074088044,0.00086519413],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054469815,0.00027670088,0.060612276,0.021705976,0.0002602537,0.0044578947,0.036147393,0.006665646,0.012775115,0.020766279,0.035438165,0.80034965],"study_design_scores_gemma":[0.00026775576,0.0009364918,0.20649923,0.027525494,0.0011852204,0.002673693,0.09468224,0.015859459,0.025108704,0.0070991497,0.617422,0.0007406342],"about_ca_topic_score_codex":0.38502714,"about_ca_topic_score_gemma":0.68354756,"teacher_disagreement_score":0.38502714,"about_ca_system_score_codex":0.017039342,"about_ca_system_score_gemma":0.049031086,"threshold_uncertainty_score":0.7655721},"labels":[],"label_agreement":null},{"id":"W610464756","doi":"","title":"Roundaboust on Alberta Highways","year":2014,"lang":"fr","type":"article","venue":"Transportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Roundabout; Transport engineering; Bottleneck; Intersection (aeronautics); Engineering; Right of way; Geometric design; Operations management","score_opus":0.004789449004123131,"score_gpt":0.1773903707170536,"score_spread":0.17260092171293048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W610464756","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109263405,0.0014392863,0.0025816301,0.002979527,0.0005867202,0.00031427862,0.0046885177,0.0019837995,0.8761629],"genre_scores_gemma":[0.13690129,0.0011897811,0.003732736,0.0004815534,0.000049546303,0.000049268587,0.0050140885,0.00022605334,0.8523557],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9991086,0.000032866727,0.000008880032,0.000071928705,0.00049099344,0.00028666802],"domain_scores_gemma":[0.9988733,0.000052635405,0.000029105064,0.000059670187,0.0006914912,0.00029384057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000355462,0.0005142547,0.00018478968,0.0012021896,0.004083733,0.0021364917,0.0010540552,0.00071359536,0.08284365],"category_scores_gemma":[0.00071624265,0.0002956356,0.00025239045,0.0014875967,0.00080265244,0.00053394114,0.0012111074,0.0006621299,0.012681381],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064212625,0.00024339184,0.023452701,0.00024396191,0.000016380583,0.0023536314,0.0018061362,0.006823767,0.006760315,0.033025276,0.58892643,0.33570594],"study_design_scores_gemma":[0.000032633467,0.00009178172,0.047429726,0.00011368062,0.000009772457,0.00023317586,0.0024000201,0.0024835388,0.0013731155,0.0011806363,0.9446016,0.00005028634],"about_ca_topic_score_codex":0.89420587,"about_ca_topic_score_gemma":0.96820515,"teacher_disagreement_score":0.10579413,"about_ca_system_score_codex":0.017604554,"about_ca_system_score_gemma":0.027441775,"threshold_uncertainty_score":0.2771396},"labels":[],"label_agreement":null},{"id":"W648191175","doi":"","title":"From freeway to feeway: congestion pricing policies for B.C.'s Fraser River crossings","year":2008,"lang":"en","type":"dissertation","venue":"Summit (Simon Fraser University)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Social Sciences and Humanities Research Council of Canada","keywords":"Singapore Area Licensing Scheme; Congestion pricing; Road pricing; Traffic congestion; Transport engineering; Geography; Engineering","score_opus":0.009988403456616361,"score_gpt":0.20164821318263645,"score_spread":0.1916598097260201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W648191175","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9293029,0.00031828802,0.02070399,0.0013454887,0.00004697715,0.0002545698,0.00025363322,0.00015300029,0.04762111],"genre_scores_gemma":[0.9893674,0.00014172286,0.0043301783,0.00003460429,0.000003978797,0.000023035736,0.000079048135,0.00001082098,0.006009125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993038,0.00021978423,0.0000143621055,0.000073585295,0.00017971125,0.00020867019],"domain_scores_gemma":[0.9994294,0.00015932329,0.000045858684,0.00003227728,0.00020862695,0.00012446237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006706678,0.00046125927,0.00027865035,0.00065780064,0.0013963286,0.0030127545,0.00091869844,0.0009993408,0.0038178114],"category_scores_gemma":[0.0024806962,0.0002875304,0.0003961675,0.00069803343,0.00056303316,0.0011272174,0.00053217757,0.00082653086,0.00020036296],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004040599,0.00037562088,0.017142218,0.00010947789,0.000067752306,0.00047007002,0.000583065,0.811296,0.0021662726,0.055280384,0.009688679,0.102416515],"study_design_scores_gemma":[0.00015273788,0.000488958,0.02574469,0.000088703855,0.00008219444,0.00012421173,0.0024627452,0.93528026,0.0019247236,0.016232355,0.017317647,0.000100797726],"about_ca_topic_score_codex":0.4881633,"about_ca_topic_score_gemma":0.6430315,"teacher_disagreement_score":0.5118367,"about_ca_system_score_codex":0.009580552,"about_ca_system_score_gemma":0.007827223,"threshold_uncertainty_score":0.97064376},"labels":[],"label_agreement":null},{"id":"W648580210","doi":"","title":"Performance-Based Geometric Design Analysis System for Capital Project Development","year":2015,"lang":"en","type":"article","venue":"Transportation Research Board 94th Annual MeetingTransportation Research Board","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Geometric design; Work (physics); Transport engineering; Sustainability; Service (business); Engineering; Systems engineering; Construction engineering; Computer science; Engineering management; Risk analysis (engineering); Business","score_opus":0.11054285496313981,"score_gpt":0.33836708719583003,"score_spread":0.22782423223269022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W648580210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011730542,0.00006764629,0.92794293,0.00012588766,0.00003713295,0.0007184039,0.0028178538,0.020892048,0.03566763],"genre_scores_gemma":[0.106563255,0.00014798334,0.87203264,0.00003498312,0.000018693248,0.0009931044,0.0060430774,0.0015081078,0.012658146],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978846,0.00042834668,0.00024647336,0.00025747792,0.0010469044,0.00013617783],"domain_scores_gemma":[0.99682295,0.0007204348,0.00037062287,0.00049454096,0.0014905664,0.00010084883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037685111,0.0016600799,0.0005935608,0.00531643,0.0010029046,0.0028276986,0.0011344127,0.0005123753,0.03282918],"category_scores_gemma":[0.0070238444,0.00068902393,0.0010069299,0.0027719447,0.0005044345,0.0016339164,0.001611102,0.0006874291,0.0061884867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031665273,0.0003002403,0.012396781,0.00065512874,0.000087033026,0.000263002,0.0015389854,0.20338127,0.010457638,0.0737028,0.04471852,0.65218186],"study_design_scores_gemma":[0.000096605414,0.00028139167,0.0066642296,0.0002080388,0.00009342615,0.00022173618,0.0007732181,0.73482114,0.012710119,0.018846527,0.22515437,0.00012921105],"about_ca_topic_score_codex":0.0172279,"about_ca_topic_score_gemma":0.022617893,"teacher_disagreement_score":0.03282918,"about_ca_system_score_codex":0.003024198,"about_ca_system_score_gemma":0.004761606,"threshold_uncertainty_score":0.1098246},"labels":[],"label_agreement":null},{"id":"W6976809871","doi":"10.6084/m9.figshare.19287824","title":"An Analysis of the Practice of Earnings Conference Calls: Evidence from Deposit Money Banks in Nigeria","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Equity (law); Quarter (Canadian coin); Sample (material); Bank account","score_opus":0.02277350861671492,"score_gpt":0.23804694077110458,"score_spread":0.21527343215438965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6976809871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9955397,0.0006582104,0.00009934416,0.0005594783,0.00001036557,0.000037267957,0.00006491816,0.0000015967696,0.00302914],"genre_scores_gemma":[0.9980083,0.0010131513,0.0001322378,0.00016422187,0.0000071808213,0.000031158914,0.000036158905,0.0000029040075,0.00060472335],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9950287,0.0027055922,0.0004989611,0.00030019818,0.00094789086,0.00051871926],"domain_scores_gemma":[0.96826565,0.018320052,0.008283049,0.00081625325,0.0032758778,0.001039098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053427974,0.0002298273,0.0003120798,0.0025780457,0.003191929,0.0032828378,0.0007002489,0.0008968432,0.0038630553],"category_scores_gemma":[0.022972351,0.00041226583,0.00013611755,0.0031996076,0.0029822516,0.0020302034,0.002160583,0.0010494811,0.0004206845],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031225153,0.00028296132,0.47246844,0.0012989348,0.000035847508,0.0023345503,0.47197923,0.000086413216,0.00069636136,0.0023917581,0.0017914535,0.0463219],"study_design_scores_gemma":[0.000007259256,0.00009988472,0.28225622,0.0009951463,0.000031750067,0.0005731296,0.7083835,0.000131988,0.0002626879,0.00019566536,0.0070419083,0.00002082665],"about_ca_topic_score_codex":0.020932207,"about_ca_topic_score_gemma":0.046537414,"teacher_disagreement_score":0.020932207,"about_ca_system_score_codex":0.0027480167,"about_ca_system_score_gemma":0.0060250494,"threshold_uncertainty_score":0.04162073},"labels":[],"label_agreement":null},{"id":"W6977202443","doi":"10.60692/yfp16-0jt78","title":"Use of vacuum-assisted closure to maintain viability of a skin flap in a dog","year":2013,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Debridement (dental); Wound closure; Granulation tissue; Skin flap; Wound healing; Rotation flap; Wound care; Reconstructive surgery","score_opus":0.021032153344556805,"score_gpt":0.18090718659644484,"score_spread":0.15987503325188804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977202443","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99714017,0.0009941518,0.0011167156,0.00021281104,0.00005210143,0.00004035816,0.000020935382,0.00003992634,0.00038286886],"genre_scores_gemma":[0.99612623,0.0006019762,0.002690913,0.00011068515,0.000035933965,0.000023746215,0.000063477484,0.0000059724143,0.0003410946],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996717,0.000088512454,0.000038192626,0.000057781886,0.00005835232,0.00008544888],"domain_scores_gemma":[0.99948514,0.00013264583,0.000111616355,0.000072439085,0.000030080897,0.00016802757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007341194,0.00048414987,0.0005949487,0.0008039197,0.00061593135,0.00054277934,0.0006840442,0.0013852253,0.00039439285],"category_scores_gemma":[0.0013322415,0.00028514361,0.00058375427,0.00017814997,0.00071481237,0.00050320895,0.00037211904,0.00063340156,0.00016584068],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043882714,0.006882119,0.07698161,0.0008259752,0.00027665385,0.3612561,0.0015133928,0.0020645089,0.47320604,0.0014172662,0.0014998043,0.069688275],"study_design_scores_gemma":[0.0005637037,0.06398725,0.08832034,0.0001531491,0.00026101412,0.70757556,0.0014022752,0.010621246,0.116944,0.0006069285,0.00945769,0.00010697151],"about_ca_topic_score_codex":0.00035360915,"about_ca_topic_score_gemma":0.0006781856,"teacher_disagreement_score":0.0013852253,"about_ca_system_score_codex":0.00045180047,"about_ca_system_score_gemma":0.00026578238,"threshold_uncertainty_score":0.0038824677},"labels":[],"label_agreement":null},{"id":"W6977231499","doi":"10.6084/m9.figshare.28957397","title":"Supplementary Material for: Dental practitioners’ thresholds for restorative intervention in carious lesions: a survey based systematic review update","year":2025,"lang":"en","type":"dataset","venue":"Figshare","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restorative dentistry; Guideline; Observational study; Data extraction; Psychological intervention; MEDLINE; Evidence-based dentistry; Intervention (counseling)","score_opus":0.03152228209952569,"score_gpt":0.29223092813450086,"score_spread":0.2607086460349752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977231499","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025840371,0.3072303,0.0047813402,0.021438126,0.004775657,0.012349021,0.62904525,0.0011407087,0.016655589],"genre_scores_gemma":[0.038536407,0.55418235,0.03759828,0.027123643,0.005912633,0.057943173,0.24553995,0.00094933267,0.03221424],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.993009,0.0017728861,0.0032000577,0.00045356786,0.001366686,0.00019790343],"domain_scores_gemma":[0.9252589,0.05129596,0.011424914,0.0012176472,0.010186415,0.0006162549],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01024324,0.0014083143,0.004335331,0.013884597,0.0005002136,0.0029728862,0.0027044755,0.0019100168,0.2883326],"category_scores_gemma":[0.09170585,0.0009775339,0.0043266495,0.013913039,0.00044221638,0.004499422,0.0024199248,0.0011388378,0.01632192],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003762366,0.000025557965,0.0007774657,0.7951136,0.0014871054,0.00012051913,0.00011392842,0.00010982794,0.00014909428,0.0009468036,0.14261489,0.058164828],"study_design_scores_gemma":[0.001241022,0.00018338588,0.010378343,0.684894,0.009243842,0.0005275918,0.0002850428,0.00022541196,0.0002837177,0.00377352,0.28885603,0.00010808856],"about_ca_topic_score_codex":0.003502538,"about_ca_topic_score_gemma":0.011239711,"teacher_disagreement_score":0.2883326,"about_ca_system_score_codex":0.002537005,"about_ca_system_score_gemma":0.010544891,"threshold_uncertainty_score":0.9645687},"labels":[],"label_agreement":null},{"id":"W6995867114","doi":"","title":"Politico-ideological Mobilisation and Violence in the Arab World : All In","year":2022,"lang":"en","type":"book","venue":"BiblioBoard Library Catalog (Open Research Library)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ideology; Politics; Geopolitics; Narrative; Action (physics); Variety (cybernetics); Political violence","score_opus":0.08506023174282447,"score_gpt":0.3054652879518915,"score_spread":0.22040505620906703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6995867114","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38892823,0.054146234,0.0018934873,0.037198395,0.0022687202,0.000049781,0.0000790258,0.000037730828,0.5153983],"genre_scores_gemma":[0.95918643,0.012104466,0.00028445837,0.002418988,0.00029196072,0.000042868633,0.00003640966,0.00002386135,0.025610644],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.998069,0.0012919573,0.000025434021,0.000063255524,0.00017485124,0.00037540903],"domain_scores_gemma":[0.99946815,0.00025482225,0.00007113901,0.000029574661,0.00007570889,0.0001006675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012348908,0.00070753845,0.00040249445,0.0011004301,0.013112494,0.009869678,0.00061233365,0.0018827997,0.0034159867],"category_scores_gemma":[0.001446861,0.0002638152,0.0001840585,0.0020999748,0.015895206,0.0045031058,0.0042624343,0.0027184775,0.00037382645],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042116357,0.000051226456,0.002881348,0.00021373383,0.000013257075,0.0008192411,0.7610276,0.00009922224,0.0003684441,0.1826925,0.013640523,0.03815086],"study_design_scores_gemma":[0.0000041657418,0.000027851753,0.0023719901,0.00033432606,0.000007859057,0.00040081955,0.76443,0.000054328226,0.00026248573,0.0126536535,0.21944007,0.000012502856],"about_ca_topic_score_codex":0.009893551,"about_ca_topic_score_gemma":0.014797297,"teacher_disagreement_score":0.013112494,"about_ca_system_score_codex":0.0036776632,"about_ca_system_score_gemma":0.0023943947,"threshold_uncertainty_score":0.02668345},"labels":[],"label_agreement":null},{"id":"W7009782686","doi":"","title":"Evaluasi Park and Ride Sebagai Prasarana Penunjang Angkutan Umum","year":2018,"lang":"id","type":"dissertation","venue":"UAJY Repository (University of Southampton)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Liquation; Exclosure; Paraphernalia","score_opus":0.005903525961444227,"score_gpt":0.17354424056601528,"score_spread":0.16764071460457106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009782686","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16142108,0.0025076547,0.00521696,0.010089109,0.001002984,0.0003410739,0.0006121502,0.00048157232,0.8183273],"genre_scores_gemma":[0.4601414,0.0023903048,0.008474696,0.0017660586,0.00014617514,0.00030222852,0.000593427,0.00030181304,0.5258839],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99894816,0.00030876586,0.00003790216,0.00013020578,0.00034664696,0.0002283679],"domain_scores_gemma":[0.9986187,0.0001832758,0.00007822855,0.00010199025,0.00053420634,0.0004835928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015115646,0.00045560484,0.00037619902,0.0006085548,0.0027980823,0.004264019,0.00065063854,0.0006787711,0.057991464],"category_scores_gemma":[0.0019480954,0.00022197611,0.00032842957,0.00044890362,0.0013925504,0.0027782156,0.0031597293,0.0016251605,0.010362815],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006301466,0.0012597038,0.04075375,0.0013732732,0.000071860726,0.0012688957,0.0738299,0.00041166638,0.012062018,0.10379122,0.2065561,0.5579914],"study_design_scores_gemma":[0.000022994947,0.0002638581,0.048730973,0.00053096615,0.000047840556,0.0002700388,0.04953125,0.00037120318,0.0032959813,0.006957538,0.88991636,0.000060969753],"about_ca_topic_score_codex":0.010266446,"about_ca_topic_score_gemma":0.04933562,"teacher_disagreement_score":0.057991464,"about_ca_system_score_codex":0.00360916,"about_ca_system_score_gemma":0.004288678,"threshold_uncertainty_score":0.19400078},"labels":[],"label_agreement":null},{"id":"W7014262440","doi":"","title":"PERENCANAAN PEMBANGUNAN INFRASTRUKTUR JALAN RAYA DI TEMANGGUNG","year":2024,"lang":"id","type":"other","venue":"UAJY Repository (University of Southampton)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Urban planning","score_opus":0.00468054424386637,"score_gpt":0.15228566495885854,"score_spread":0.14760512071499216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014262440","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16158779,0.0075258566,0.022753553,0.011419855,0.0011600626,0.0003732625,0.0021460813,0.0018604023,0.791173],"genre_scores_gemma":[0.49898663,0.0069154114,0.0210265,0.0016377631,0.00026089256,0.0003362939,0.0018830971,0.00076676277,0.46818668],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99872774,0.00020347245,0.000049585276,0.00025948684,0.0004509853,0.0003087949],"domain_scores_gemma":[0.9984207,0.00023527785,0.00014829014,0.0002470035,0.00051758887,0.00043102654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012872216,0.000891845,0.00047627452,0.0019044626,0.0041307462,0.0070233685,0.001264151,0.0012901095,0.055661485],"category_scores_gemma":[0.0016109063,0.0004956302,0.0005875201,0.0022804465,0.0018293512,0.002830938,0.0058299587,0.0022618994,0.013539605],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000492541,0.0004537089,0.042421978,0.0020678728,0.00015834387,0.0019555097,0.019073594,0.0026494064,0.03114505,0.11996186,0.068765976,0.7108542],"study_design_scores_gemma":[0.000016629285,0.00019372729,0.033963528,0.0003982299,0.00005533319,0.00057009625,0.0110776415,0.0004325706,0.006083959,0.0058900896,0.94125485,0.00006324735],"about_ca_topic_score_codex":0.016380891,"about_ca_topic_score_gemma":0.032501966,"teacher_disagreement_score":0.055661485,"about_ca_system_score_codex":0.00406372,"about_ca_system_score_gemma":0.0070241606,"threshold_uncertainty_score":0.18620622},"labels":[],"label_agreement":null},{"id":"W7033757068","doi":"","title":"The Richard Syrett Show - May 27, 2022 - Moderna Dumping Unwanted COVID Vaccine Doses, &amp; Government Hiding Evidence on Origins of COVID","year":2022,"lang":"en","type":"other","venue":"Bulletin of Miscellaneous Information (Royal Gardens Kew)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Happening; Shot (pellet); Coronavirus disease 2019 (COVID-19); Capital (architecture); Dumping","score_opus":0.010630510901512472,"score_gpt":0.19434865718788863,"score_spread":0.18371814628637617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033757068","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010354038,0.0012618944,0.00025038884,0.009361649,0.0034973554,0.00007703018,0.0025142434,0.0006222102,0.9813798],"genre_scores_gemma":[0.001981236,0.0002709952,0.00006628779,0.0014285335,0.00013731011,0.00001547558,0.00042289207,0.00010373759,0.9955734],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942386,0.000043207147,0.000013016797,0.000058969315,0.0003035667,0.00015740904],"domain_scores_gemma":[0.9991091,0.00009837289,0.000045256726,0.00005788324,0.000385954,0.00030338863],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0006163947,0.0006460977,0.00027019434,0.0005998659,0.0031253286,0.0037490022,0.0005335977,0.0024147814,0.48456874],"category_scores_gemma":[0.002326653,0.0004812617,0.00035619302,0.00054247055,0.00054577395,0.0014572664,0.0011827328,0.002558986,0.32423443],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010833661,0.0000061545948,0.00009732366,0.000010361092,4.9038e-7,0.000024350416,0.000016030472,0.000009040337,0.000058967442,0.000649072,0.9951238,0.0039935918],"study_design_scores_gemma":[0.0000029255964,0.000009198289,0.0010440204,0.000023713665,0.0000010919464,0.000017786902,0.00010342917,0.000027218046,0.00011250313,0.00012369281,0.9985304,0.000003992049],"about_ca_topic_score_codex":0.058667187,"about_ca_topic_score_gemma":0.2302989,"teacher_disagreement_score":0.5154313,"about_ca_system_score_codex":0.0022398033,"about_ca_system_score_gemma":0.0029803882,"threshold_uncertainty_score":0.7352001},"labels":[],"label_agreement":null},{"id":"W7039291198","doi":"","title":"Menjar en temps de guerra. Joan Comorera front les necessitats alimentàries de la rereguarda","year":2024,"lang":"ca","type":"article","venue":"Revistes Científiques de la University of Barcelona (University of Barcelona)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Front (military); Quarter (Canadian coin); Front line; Work (physics)","score_opus":0.004547897904700374,"score_gpt":0.20345704701287076,"score_spread":0.1989091491081704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7039291198","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17198943,0.014406401,0.021314573,0.05781746,0.0027910052,0.00012994248,0.0011562449,0.0006224626,0.72977245],"genre_scores_gemma":[0.57400054,0.0054397956,0.010731003,0.005008527,0.0003559099,0.00009344005,0.0005618934,0.00035063742,0.4034582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989485,0.00032488978,0.000026165706,0.00026912996,0.00021571193,0.00021557395],"domain_scores_gemma":[0.99915266,0.0001663436,0.00012454628,0.00012033129,0.00027504415,0.00016099848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010903728,0.00064852904,0.0005359371,0.0009168989,0.0042161485,0.0051164203,0.0006943392,0.0018170244,0.028039707],"category_scores_gemma":[0.0023532775,0.00035763028,0.00063596934,0.0008009113,0.0028920206,0.0023736095,0.002935856,0.0023840987,0.005453975],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007288178,0.00024533842,0.027185112,0.0010493925,0.00015771369,0.0023507017,0.04176921,0.0020069182,0.0061305896,0.60444903,0.13437824,0.17954898],"study_design_scores_gemma":[0.000023721,0.00010956602,0.025949087,0.0005075267,0.000046690555,0.0004515073,0.01984878,0.00055032474,0.000988115,0.031031631,0.9204345,0.00005865536],"about_ca_topic_score_codex":0.060236998,"about_ca_topic_score_gemma":0.13605739,"teacher_disagreement_score":0.060236998,"about_ca_system_score_codex":0.005336719,"about_ca_system_score_gemma":0.0030554337,"threshold_uncertainty_score":0.11977273},"labels":[],"label_agreement":null},{"id":"W7039496742","doi":"","title":"Le transfert de l’innovation sociale dans le projet Emplois de solidarité : à la recherche d’une nouvelle politique publique dans le domaine de l’insertion socioprofessionnelle","year":2016,"lang":"fr","type":"report","venue":"Érudit documents and data repository (Érudit Consortium, University of Montreal)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Capitalism; Forge","score_opus":0.03800406971231438,"score_gpt":0.2540041991069002,"score_spread":0.21600012939458582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7039496742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.454945,0.008335736,0.06965701,0.08499488,0.00093699375,0.00080631144,0.0004705167,0.00033899987,0.37951455],"genre_scores_gemma":[0.90038645,0.0046449048,0.020887028,0.0026700026,0.00018594215,0.000997385,0.00021611135,0.00017508242,0.069837175],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9785175,0.0132866185,0.00057989964,0.0017124148,0.0041227913,0.0017808317],"domain_scores_gemma":[0.9508717,0.03013106,0.002838923,0.0034514714,0.008033124,0.0046737855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028287346,0.0005464137,0.0005984192,0.002807215,0.008241678,0.019543799,0.0020638893,0.0038113405,0.019350369],"category_scores_gemma":[0.026620945,0.0004636631,0.00077806,0.0038684222,0.012029205,0.012261564,0.0131481895,0.005527739,0.0028414472],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019737372,0.0006022685,0.019697458,0.0015709406,0.00007856418,0.001019414,0.34156686,0.0017792882,0.0028836967,0.39532298,0.0126460595,0.22263515],"study_design_scores_gemma":[0.00005721647,0.0005519862,0.047444534,0.0029033418,0.000072135444,0.00046391843,0.40301853,0.0023958113,0.0054215323,0.063604064,0.47392216,0.00014473594],"about_ca_topic_score_codex":0.017259948,"about_ca_topic_score_gemma":0.02023939,"teacher_disagreement_score":0.028287346,"about_ca_system_score_codex":0.016043037,"about_ca_system_score_gemma":0.03139504,"threshold_uncertainty_score":0.14959961},"labels":[],"label_agreement":null},{"id":"W7039679925","doi":"","title":"MINDWAR: Psychological Warfare and PSYOPS","year":2022,"lang":"en","type":"other","venue":"Bulletin of Miscellaneous Information (Royal Gardens Kew)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incarnation; Hollywood; Realm; Adversary; Public opinion; Cult; Vampire; Politics; Iraq war","score_opus":0.005716729225373032,"score_gpt":0.1746431357747377,"score_spread":0.16892640654936467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7039679925","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03542803,0.027386425,0.0014819843,0.082459465,0.009809153,0.000047644397,0.00021772803,0.00023300004,0.8429366],"genre_scores_gemma":[0.35950083,0.01902094,0.0006563191,0.023334974,0.0035826336,0.00012630886,0.00018900562,0.00039258285,0.5931965],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99958926,0.00015090336,0.000008197555,0.000044859844,0.00007577412,0.00013100813],"domain_scores_gemma":[0.99979824,0.00006609837,0.000017204944,0.000013796903,0.000014159908,0.00009048873],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00036728499,0.0005040488,0.00018566463,0.00057261693,0.008457676,0.0055023055,0.0004104179,0.0015844128,0.028651979],"category_scores_gemma":[0.00079680164,0.0002154548,0.00023533162,0.0005960552,0.006426215,0.004828383,0.005443399,0.006380855,0.0034639682],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006364972,0.00008916175,0.0006580287,0.00024257014,0.0000092416185,0.0010728074,0.09404242,0.00006279531,0.0004941194,0.3366857,0.5152095,0.051370054],"study_design_scores_gemma":[0.000004651719,0.000012414571,0.00077598105,0.00013112395,0.0000015893363,0.00030033468,0.02296223,0.000017957293,0.00011296467,0.007575665,0.9680996,0.0000054850016],"about_ca_topic_score_codex":0.004915595,"about_ca_topic_score_gemma":0.014507459,"teacher_disagreement_score":0.97134805,"about_ca_system_score_codex":0.0027881449,"about_ca_system_score_gemma":0.0011568608,"threshold_uncertainty_score":0.09585041},"labels":[],"label_agreement":null},{"id":"W7043663900","doi":"","title":"Strategi Manajemen Dan Rekayasa Lalu Lintas Di Ruas Jalan Jenderal Sudirman Kota Kupang Dengan Menggunakan Analisis SWOT","year":2021,"lang":"id","type":"dissertation","venue":"Repository Universitas Katolik Widya Mandira (Universitas Katolik Widya Mandala)","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Nucleofection; Gestational period; Articular cartilage damage; Fusible alloy; Liquation; Paraphernalia","score_opus":0.0077951030014764555,"score_gpt":0.1954026720083651,"score_spread":0.18760756900688866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043663900","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2515034,0.11617178,0.08449651,0.11293763,0.005146668,0.004902718,0.0035243398,0.0030606226,0.41825643],"genre_scores_gemma":[0.59886485,0.077807374,0.0902469,0.01778648,0.0018398344,0.0028305545,0.0024024048,0.00059478095,0.20762679],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9963406,0.0013847705,0.00022310932,0.0005474696,0.0008063999,0.0006978037],"domain_scores_gemma":[0.99661225,0.00080205064,0.0005145878,0.00020569537,0.00094881374,0.0009167156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039441646,0.001224977,0.0009653176,0.0015711632,0.0019779897,0.005285797,0.0014699838,0.0020175704,0.030840246],"category_scores_gemma":[0.0049882135,0.0005522644,0.0014838963,0.00092848256,0.0010263294,0.002618346,0.0034277125,0.0026868365,0.010358356],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013413231,0.0015794808,0.05843665,0.005698308,0.00046683112,0.0035456074,0.005807988,0.002083152,0.022063365,0.014546345,0.06762189,0.8168092],"study_design_scores_gemma":[0.00019508682,0.003106582,0.055206113,0.0057019303,0.00073999696,0.006028536,0.020136245,0.0030457412,0.016654545,0.012016314,0.8769118,0.00025707195],"about_ca_topic_score_codex":0.009137338,"about_ca_topic_score_gemma":0.015781265,"teacher_disagreement_score":0.030840246,"about_ca_system_score_codex":0.0031817274,"about_ca_system_score_gemma":0.0082880035,"threshold_uncertainty_score":0.10317093},"labels":[],"label_agreement":null},{"id":"W7100578951","doi":"","title":"Canada Participation in Adult Schooling and its Earnings Impact in Canada by","year":2006,"lang":"en","type":"article","venue":"","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Government (linguistics); Work (physics); Immigration","score_opus":0.0025497708752562384,"score_gpt":0.1722221675924152,"score_spread":0.16967239671715897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100578951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9303465,0.0053379736,0.00021134123,0.009858071,0.0001866886,0.000060061484,0.032703407,0.000082659084,0.021213274],"genre_scores_gemma":[0.97668207,0.00167981,0.00012206788,0.00035764294,0.00003151762,0.0000152379325,0.004588702,0.000017188173,0.016505802],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978757,0.00012826973,0.000102448575,0.0001748639,0.00052353594,0.0011952732],"domain_scores_gemma":[0.99146724,0.000348247,0.0008977097,0.00012410524,0.0035966549,0.0035660218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090759725,0.0003624698,0.0006250047,0.0020862184,0.0034430823,0.0028285014,0.001529693,0.0009883586,0.010559572],"category_scores_gemma":[0.004221292,0.00026130065,0.0012374423,0.006091078,0.00092095917,0.00076082104,0.001832826,0.002161028,0.0007388411],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031622723,0.00017506079,0.9570311,0.00008707451,0.0001625504,0.00026252258,0.0015475154,0.0009500447,0.00009844447,0.0048118955,0.018066926,0.016490728],"study_design_scores_gemma":[0.000022442062,0.00002976733,0.98724383,0.000096415344,0.00007220205,0.00004678514,0.0024574578,0.00065189507,0.00008381153,0.00018703638,0.009086895,0.000021532425],"about_ca_topic_score_codex":0.9988134,"about_ca_topic_score_gemma":0.99915063,"teacher_disagreement_score":0.050464112,"about_ca_system_score_codex":0.050464112,"about_ca_system_score_gemma":0.082454845,"threshold_uncertainty_score":0.36614442},"labels":[],"label_agreement":null},{"id":"W7114892069","doi":"10.25105/bhuwana.v5i2.22979","title":"ANALISIS PENERAPAN TOD DI KAWASAN DUKUH ATAS BNI","year":2025,"lang":"","type":"article","venue":"JURNAL BHUWANA","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Crowds; Government (linguistics); Dimension (graph theory); Pedestrian; Public transport; Mode (computer interface); Sustainable development; Ideal (ethics)","score_opus":0.007035759932713603,"score_gpt":0.2187536613094033,"score_spread":0.2117179013766897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114892069","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96761525,0.00017098937,0.00084545475,0.00016315453,0.0000197642,0.000058051006,0.00040225772,0.000024209783,0.030700872],"genre_scores_gemma":[0.9900171,0.00025893105,0.00073414814,0.0000306327,0.0000022911024,0.000031684544,0.0003340949,0.0000101589185,0.008581073],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996853,0.00006653193,0.000025606889,0.0000562583,0.00008628063,0.00008008906],"domain_scores_gemma":[0.99966466,0.000057861107,0.0000602131,0.000025974032,0.00013609121,0.0000552203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003183399,0.00020912361,0.00020383354,0.00068299513,0.0010758584,0.0013539024,0.00038374076,0.00018386502,0.0045774174],"category_scores_gemma":[0.0006930593,0.0001505499,0.00023046101,0.0015797383,0.00050635444,0.00068706763,0.00091209955,0.00041767413,0.0005828231],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002815026,0.0004932945,0.78518045,0.0006492535,0.00007558462,0.00521873,0.042465933,0.0029968414,0.0037690145,0.01733799,0.008438265,0.13309312],"study_design_scores_gemma":[0.000009022523,0.00015814624,0.7499954,0.0002299049,0.00006671276,0.0012425804,0.17941429,0.0038841413,0.002177437,0.0011524158,0.06163502,0.000034947006],"about_ca_topic_score_codex":0.029616948,"about_ca_topic_score_gemma":0.06820353,"teacher_disagreement_score":0.029616948,"about_ca_system_score_codex":0.0020749676,"about_ca_system_score_gemma":0.0013590495,"threshold_uncertainty_score":0.05888915},"labels":[],"label_agreement":null},{"id":"W7124267001","doi":"10.29313/jrpwk.v5i2.7256","title":"Faktor Pendorong Pendirian Bangunan di Sempadan Rel Kereta Api Stasiun Tanjung Karang","year":2025,"lang":"","type":"article","venue":"Jurnal Riset Perencanaan Wilayah dan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Population; Field survey; Service (business); Socioeconomic status","score_opus":0.008461889184710544,"score_gpt":0.2266728893975593,"score_spread":0.21821100021284875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124267001","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7979696,0.011317608,0.0021414063,0.005841776,0.001972312,0.0002450137,0.0019673808,0.0003226613,0.17822225],"genre_scores_gemma":[0.86201113,0.0077923043,0.002451622,0.00046393852,0.00016910286,0.00011026718,0.0011887591,0.000053000804,0.12575984],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997601,0.000046001827,0.000019056146,0.000040650164,0.00007047754,0.000063793435],"domain_scores_gemma":[0.99958426,0.00010202619,0.000067419634,0.00003072912,0.00013226787,0.000083246894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043093014,0.000508869,0.00022899415,0.00056248414,0.0012860597,0.0015445778,0.00028725062,0.00041893625,0.03709661],"category_scores_gemma":[0.0006314107,0.00018865422,0.00016436355,0.0008891281,0.0003930971,0.0004992599,0.000770697,0.0005147355,0.005855346],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007879182,0.00067137106,0.20247345,0.0036626246,0.00011682992,0.012052143,0.015798554,0.0014423536,0.024752032,0.016702943,0.1092303,0.61230946],"study_design_scores_gemma":[0.000046587895,0.0003733985,0.25091162,0.0006056121,0.000113096095,0.0055245147,0.025590708,0.0011293663,0.008471949,0.0014366328,0.7057114,0.000085166284],"about_ca_topic_score_codex":0.005962629,"about_ca_topic_score_gemma":0.010422729,"teacher_disagreement_score":0.03709661,"about_ca_system_score_codex":0.00078224705,"about_ca_system_score_gemma":0.0027069063,"threshold_uncertainty_score":0.124100566},"labels":[],"label_agreement":null},{"id":"W7131215793","doi":"10.14710/jpk.13.1.83-91","title":"PENGUKURAN DAN PENINGKATAN TINGKAT PELAYANAN JALUR PEJALAN KAKI DI JALAN BRAGA KOTA BANDUNG","year":2025,"lang":"","type":"article","venue":"Jurnal Pengembangan Kota","topic":"Urban Transport Systems Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Green belt; Cross-border cooperation; Subbase","score_opus":0.008904536963168272,"score_gpt":0.2239953048437225,"score_spread":0.2150907678805542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7131215793","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36053804,0.016437106,0.024123726,0.007515705,0.0016812657,0.0008430843,0.005725783,0.0016831146,0.5814521],"genre_scores_gemma":[0.5085979,0.012519282,0.03685367,0.0016475616,0.00020159353,0.0006286226,0.0038123943,0.00074849674,0.4349904],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99870265,0.00021405406,0.000074297706,0.00024260637,0.0005144134,0.00025199563],"domain_scores_gemma":[0.99865687,0.00024382315,0.00015176837,0.00013210207,0.0006328753,0.00018253153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013457605,0.0009060511,0.00052912254,0.0016690054,0.0031314236,0.0045618806,0.0010971042,0.0011571187,0.05851831],"category_scores_gemma":[0.0019444495,0.00064676796,0.00060746423,0.0020566178,0.0012129477,0.0021644402,0.0022701025,0.0015223157,0.015093064],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011609487,0.0008955473,0.07204992,0.004067464,0.00020586509,0.001862352,0.014937864,0.0017757355,0.05286345,0.03167816,0.06583937,0.7526633],"study_design_scores_gemma":[0.000043924356,0.0005416881,0.0916558,0.0009895944,0.00015824815,0.00095047,0.016365303,0.0007132657,0.016896121,0.0035349678,0.8680113,0.00013934473],"about_ca_topic_score_codex":0.01912974,"about_ca_topic_score_gemma":0.055140518,"teacher_disagreement_score":0.05851831,"about_ca_system_score_codex":0.002205411,"about_ca_system_score_gemma":0.0046963748,"threshold_uncertainty_score":0.19576323},"labels":[],"label_agreement":null}]}